Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-23
... reversible pump turbine with a total installed generating capacity of 250 megawatts (MW); (6) a transformer... with a total installed generating capacity of 250 MW; (6) a transformer hall; (7) a lower reservoir; (8... installed generating capacity of 250 MW; (6) a transformer hall; (7) a lower reservoir with a storage...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-14
... maximum hydraulic capacity of 331 cubic feet per second (cfs), to two generating units with a total installed capacity of 321 kW and a maximum hydraulic capacity of 333 cfs. The two units are: One existing unit rated at 225 kW with a maximum hydraulic capacity of 233 cfs and one proposed unit to be installed...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-21
... shaft Kaplan turbine-generating unit with a total installed capacity of 0.84 MW; (5) a new 135-foot-long... outlet works; (4) a minimum flow turbine generator and a new 2,000-square-foot powerhouse containing one or two submersible or tubular-type turbine generators with a total installed capacity of 0.36 MW; (5...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-09
... a total installed capacity of 500 kilowatts (kW); and (2) a station transformer at the powerhouse to... station transformer at the powerhouse to connect the turbine output to a 13.8-kV distribution line owned... turbine/generating units with a total installed capacity of 1,200 kW; and (2) a station transformer at the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-13
... 945-kW turbine-generator units for a total installed capacity of 1,890 kW; (9) a 14.5-foot-long... a 600-kW turbine-generator unit and a 1,200-kW turbine-generator unit for a total installed capacity...-wide concrete-brick powerhouse containing a 600-kW turbine-generator unit and a 700-kW turbine...
NASA Astrophysics Data System (ADS)
Butuzov, V. A.; Amerkhanov, R. A.; Grigorash, O. V.
2018-05-01
Solar and geothermal energy systems are shown to have received the widest use among all kinds of renewable sources of energy for heat supply purposes around the world. The power capacities and amounts of thermal energy generated by solar and geothermal heat supply systems around the world are presented by way of comparison. The thermal power capacity of solar heat supply systems installed around the world as of 2015 totaled 268.1 GW, and the thermal energy generated by them amounted to 225 TW h/year. The thermal power capacity of geothermal heat supply systems installed around the world totaled 70.3 GW, and the thermal energy generated by them amounted to 163 TW h/year. Information on the geothermal heat supply systems in the leading countries around the world based on the data reported at the World Geothermal Congress held in 2015 is presented. It is shown that China, with the installed thermal power capacities of its geothermal heat supply stations totaling 17.87 GW and the amount of thermal energy generated per annum equal to 48.435 TW h/year, is the world's leader in this respect. The structures of geothermal heat supply systems by the kinds of heat consumption used around the world are presented. The systems equipped with geothermal heat pumps accounted for 70.95% in the total installed capacity and for 55.3% in the total amount of generated heat. For systems that do not use heat pumps, those serving for pools account for the largest share amounting to 44.74% in installed capacity and to 45.43% in generated heat. A total of 2218 geothermal wells with the total length equal to 9534 km (with 38.7% of them for heat supply purposes) were drilled in 42 countries in the period from 2010 to 2014. In Russia, geothermal heat supply systems are in operation mainly in Dagestan, in Krasnodar krai, and in Kamchatka. The majority of these systems have been made without breaking the stream after the well outlet. A cyclic control arrangement is also used. The combined geothermal and solar heat supply system with an installed thermal power capacity of 5 MW that is in operation in the Rozovyi settlement, Krasnodar krai, is described. In the summer time, the solar installation with a capacity of 115 kW is used for supplying hot water to residential houses and for restoring the geothermal well pore pressure. The basic process circuit and characteristics of the geothermal heat supply system with the installed thermal power capacity of 8.7 MW operating in the Khankala settlement, the city of Groznyi, are given. The specific feature of this system is that the spent geothermal heat carrier is reinjected into a specially drilled inclined well. Advanced geothermal heat supply technologies involving reinjection of the spent geothermal heat carrier, combination with binary power units, use of heat pumps for recovering the spent heat carrier, and protection of equipment from corrosion and deposits are proposed.
NASA Astrophysics Data System (ADS)
Ramirez Camargo, Luis; Dorner, Wolfgang
2016-04-01
The yearly cumulated technical energy generation potential of grid-connected roof-top photovoltaic power plants is significantly larger than the demand of domestic buildings in sparsely populated municipalities in central Europe. However, an energy balance with cumulated annual values does not deliver the right picture about the actual potential for photovoltaics since these run on a highly variable energy source as solar radiation. The mismatch between the periods of generation and demand creates hard limitations for the deployment of the theoretical energy generation potential of roof-top photovoltaics. The actual penetration of roof-top photovoltaic is restricted by the energy quality requirements of the grid and/or the available storage capacity for the electricity production beyond the coverage of own demands. In this study we evaluate in how far small-scale storage systems can contribute to increment the grid-connected roof-top photovoltaic penetration in domestic buildings at a municipal scale. To accomplish this, we calculate, in a first step, the total technical roof-top photovoltaic energy generation potential of a municipality in a high spatiotemporal resolution using a procedure that relies on geographic information systems. Posteriorly, we constrain the set of potential photovoltaic plants to the ones that would be necessary to cover the total yearly demand of the municipality. We assume that photovoltaic plants with the highest yearly yield are the ones that should be installed. For this sub-set of photovoltaic plants we consider five scenarios: 1) no storage 2) one 7 kWh battery is installed in every building with a roof-top photovoltaic plant 3) one 10 kWh battery is installed in every building with a roof-top photovoltaic plant 4) one 7 kWh battery is installed in every domestic building in the municipality 5) one 10 kWh battery is installed in every domestic building in the municipality. Afterwards we evaluate the energy balance of the municipality using a series of indicators. These indicators include: a) the total photovoltaic installed capacity, b) the total storage installed capacity, c) the output variability, d) the total unfulfilled demand, e) total excess energy, f) total properly supplied energy, g) the loss of power supply probability, h) the amount of hours of supply higher than the highest demand in a year, i) the number of hours, when supply is 1.5. times higher than the highest demand in a year, and j) the additional storage energy capacity and power required to store all excess energy generated by the photovoltaic installations. The comparison of the proposed indicators serves to quantify the contribution that household-sized small-scale storage systems would make to the energy balance of the studied municipality. Increased installed energy storage capacity allows a higher roof-top photovoltaic share and improves energy utilization, variability and reliability indicators. The proposed methodology serves also to determine the amount of storage capacity with the highest positive impact on the local energy balance.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-01-01
This monograph consists of 25 data tables that will be included in the subject year book, revealing such information as: total US installed generating capacity; installed capacity by states; installed capacity by ownership and type of prime mover; capability - peak load - kWh requirements; generation by states; generation by fuel; sales by years and classes of service; ultimate customers - by years and classes of service; revenues - by years and classes of service; average use and revenue per customer; average revenues per kWh sold; consumption of fossil fuels for electric generation; construction expenditures; and public-utility long-term financing.
China power - thermal coal and clean coal technology export. Topical report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Binsheng Li
1996-12-31
China is the world`s fourth largest electric power producer, and is expected to surpass Japan within the next two years to become the third largest power producer. During the past 15 years, China`s total electricity generation more than tripled, increasing from about 300 TWh to about 1,000 TWh. Total installed generating capacity grew at an average of 8.2 percent per year, increasing from 66 to 214 GW. The share of China`s installed capacity in Asia increased from 21 to 31 percent. The Chinese government plans to continue China`s rapid growth rate in the power sector. Total installed capacity is plannedmore » to reach 300 GW by 2000, which will generate 1,400 TWh of electricity per year. China`s long-term power sector development is subject to great uncertainty. Under the middle scenario, total capacity is expected to reach 700 GW by 2015, with annual generation of 3,330 TWh. Under the low and high scenarios, total capacity will reach 527-1,005 GW by 2015. The high scenario representing possible demand. To achieve this ambitious scenario, dramatic policy changes in favor of power development are required; however, there is no evidence that such policy changes will occur at this stage. Even under the high scenario, China`s per capita annual electricity consumption would be only 3,000 kWh by 2015, less than half of the present per capita consumption for OECD countries. Under the low scenario, electricity shortages will seriously curb economic growth.« less
2014 Wind Technologies Market Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiser, R.; Bolinger, M.
According to the 2014 Wind Technologies Market Report, total installed wind power capacity in the United States grew at a rate of eight percent in 2014, bringing the United States total installed capacity to nearly 66 gigawatts (GW), which ranks second in the world and meets 4.9 percent of U.S. end-use electricity demand in an average year. In total, 4,854 MW of new wind energy capacity were installed in the United States in 2014. The 2014 Wind Technologies Market Report also finds that wind energy prices are at an all-time low and are competitive with wholesale power prices and traditionalmore » power sources across many areas of the United States. Additionally, a new trend identified by the 2014 Wind Technologies Market Report shows utility-scale turbines with larger rotors designed for lower wind speeds have been increasingly deployed across the country in 2014. The findings also suggest that the success of the U.S. wind industry has had a ripple effect on the American economy, supporting 73,000 jobs related to development, siting, manufacturing, transportation, and other industries.« less
Promotion of renewable energy in some MENA region countries
NASA Astrophysics Data System (ADS)
Abdeladim, K.; Bouchakour, S.; Arab, A. Hadj; Ould Amrouche, S.; Yassaa, N.
2018-05-01
In recent years Middle East and North African (MENA) countries, are showing efforts about the integration of renewable electricity into their power markets. Indeed, installations were already achieved and renewable energy programs were launched. The Algerian program remains one of the most ambitious with its installation capacity up to 22GW of power generating to be installed by 2030. More than 60 % of the total capacity is planned to be solar photovoltaic (PV). Like Algeria, Morocco has integrated development project with a target to develop by 2020 a 2000 MW capacity of electricity production from solar energy. The Tunisian government has launched its first phase of the renewable power generation program, with an objective to install 1,000 MW of renewable power capacity over the 2017-2020 periods, where 650 MW of the total capacity is planned to be solar and 350 MW wind. One of the leading Arab country in wind energy, these recent years is Egypt, with its more than 700 megawatt of operational power generation plants and has launched significant projects development in solar energy. Regarding Jordan, the government has taken different steps in this field of energy with a Strategy plan 2007-2020, by implementing a large scale of projects on renewable energy sources, with an objective to cover 10% of the country’s energy supply, from renewable sources by the year 2020. Concerning Lebanon, the country is looking to attain an integration of 12 % by 2020.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... units installed in a matrix on the bottom of the river; (2) the total capacity of the installation would be up to 110,000 kilowatts; (3) shielded underwater cables would convey each matrix's power to a...
Adding concentrated solar power plants to wind farms to achieve a good utility electrical load match
USDA-ARS?s Scientific Manuscript database
Texas has the greatest installed wind turbine capacity of any state in the United States, the percentage of wind capacity approaches 10% of the utilities capacity (in 2010 the total wind generated capacity in Texas was 8%). It is becomimg increasingly difficult for the utility to balance the elec...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... installed in a matrix on the bottom of the river; (2) the total capacity of the installation would be up to 75,000 kilowatts; (3) shielded underwater cables would convey each matrix power to a substation; and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... generating units installed in a matrix on the bottom of the river; (2) the total capacity of the installation would be up to 38,000 kilowatts; (3) shielded underwater cables would convey each matrix's power to a...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... installed in a matrix on the bottom of the river; (2) the total capacity of the installation would be up to 35,000 kilowatts; (3) shielded underwater cables would convey each matrix power to a substation; and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... generating units installed in a matrix on the bottom of the river; (2) the total capacity of the installation would be up to 50,000 kilowatts; (3) shielded underwater cables would convey each matrix power to a...
Assessing the Future of Distributed Wind: Opportunities for Behind-the-Meter Projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lantz, Eric; Sigrin, Benjamin; Gleason, Michael
2016-11-01
Wind power is one of the fastest growing sources of new electricity generation in the United States. Cumulative installed capacity was more than 74,000 megawatts (MW) at year-end 2015 and wind power supplied 4.7% of total 2015 U.S. electricity generation. Despite the growth of the wind power industry, the distributed wind market has remained limited. Cumulative installations of distributed wind through 2015 totaled 934 MW. This first-of-a-kind exploratory analysis characterizes the future opportunity for behind-the-meter distributed wind, serving primarily rural or suburban homes, farms, and manufacturing facilities. This work focuses only on the grid-connected, behind-the-meter subset of the broader distributedmore » wind market. We estimate this segment to be approximately half of the 934 MW of total installed distributed wind capacity at year-end 2015. Potential from other distributed wind market segments including systems installed in front of the meter (e.g., community wind) and in remote, off-grid locations is not assessed in this analysis and therefore, would be additive to results presented here. These other distributed wind market segments are not considered in this initial effort because of their relatively unique economic and market attributes.« less
Conjunctive use of groundwater and surface water for irrigated agriculture: Risk aversion
Bredehoeft, John D.; Young, Richard A.
1983-01-01
In examining the South Platte system in Colorado where surface water and groundwater are used conjunctively for irrigation, we find the actual installed well capacity is approximately sufficient to irrigate the entire area. This would appear to be an overinvestment in well capacity. In this paper we examine to what extent groundwater is being developed as insurance against periods of low streamflow. Using a simulation model which couples the hydrology of a conjunctive stream aquifer system to a behavioral-economic model which incorporates farmer behavior in such a system, we have investigated the economics of an area patterned after a reach of the South Platte Valley in Colorado. The results suggest that under current economic conditions the most reasonable groundwater pumping capacity is a total capacity capable of irrigating the available acreage with groundwater. Installing sufficient well capacity to irrigate all available acreage has two benefits: (1) this capacity maximizes the expected net benefits and (2) this capacity also minimizes the variation in annual income: it reduces the variance to essentially zero. As pumping capacity is installed in a conjunctive use system, the value of flow forecasts is diminished. Poor forecasts are compensated for by pumping groundwater.
40 CFR 51.308 - Regional haze program requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... for fossil-fuel fired power plants having a total generating capacity greater than 750 megawatts must...-eligible fossil fuel-fired steam electric plants in the State to install, operate, and maintain BART for... fossil fuel-fired steam electric plants in the State to install, operate, and maintain BART for the...
40 CFR 51.308 - Regional haze program requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... for fossil-fuel fired power plants having a total generating capacity greater than 750 megawatts must...-eligible fossil fuel-fired steam electric plants in the State to install, operate, and maintain BART for... fossil fuel-fired steam electric plants in the State to install, operate, and maintain BART for the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-17
..., 60-foot-wide powerhouse to contain two turbine/ generating units with a total installed capacity of 12 megawatts, with a hydraulic capacity of 90 cubic feet per second, and an average hydraulic head of...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-09
..., 60-foot-wide powerhouse to contain two turbine/ generating units with a total installed capacity of 12 megawatts, with a hydraulic capacity of 90 cubic feet per second, and an average hydraulic head of...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-29
... total capacity of 1,700 kilowatts (kW), installed within the existing intake tower; (2) an electrical control booth constructed on top of the intake tower; and (3) a 700- foot-long, 13.2 kilo-Volt (kV...; (3) a powerhouse containing two generating units with a total capacity of 3,320 kW; (4) the existing...
Air pollution may alter efforts to mitigate climate change
NASA Astrophysics Data System (ADS)
Yassaa, Noureddine
2016-02-01
Renewable energy, considered in the past as a mitigation option to climate change by reducing carbon emission, is now becoming a source of energy security and competing fossil fuels in many areas of the world. According to recent reports (e.g., IEA, IRENA, REN21), renewable energy has reached in 2014 a historical record of power generation capacity. With 1712 GW installed capacity in 2014, renewable energy represents 27.7% of the world's power generating capacity. Solar photovoltaic (PV) energy, conversion of solar light to electricity through solar panels, has increased to reach 177 GW mostly due to the political engagement for the deployment of renewable through targeted programs and the decrease of PV panels prize in the market (roughly 80% decrease since 2008 according to IRENA's report). Concentrated Solar Power (CSP), reaching a total capacity of 4.4 GW in 2014 (REN21 Report), is also demonstrating a clear growth and progresses have been made with regards to the efficiency, the storage capacity and the cost. In order to reduce the energy consumption and carbon emissions, water solar heaters are being installed in the rooftop of households and a total capacity of 406 GW thermal was recorded in 2014 (REN21 Report).
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-28
... Kaplan turbine/generator units with a total installed capacity of 2.5 megawatts, to be installed... to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov... printed on the ``eLibrary'' link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp...
Electrical Energy Reduction for Army Installations.
1981-05-01
noted from Figure 2. The total connected transformer capacity on this circuit is 3280 kVA, of which 187 kVA is the connected transformer capacity of...means that the motor requires less total current. Lower line current means that less energy is wasted in the feeder circuits serving the motor. Variation...affected by such means as Frequency Modulation (FM) signals to receivers on the equipment, or by high-frequency power line carrier signic to receiving
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schneider, Abraham; Schneider, Gia; McKinstry, Katherine
Natel Energy is a low-head, distributed hydropower company based out of Alameda, CA. Natel manufactures and sells proprietary hydroelectric turbines called hydroEngines® that are suitable for low-head, high-flow settings, and range from 30kW to 1 MW of capacity per unit. Natel’s hydroEngine is a state-ofthe-art two stage impulse turbine, using blades mounted symmetrically on two belts perpendicular to the axis of travel, and using linearly-moving foils, rather than a rotor, to enable efficient conversion of kinetic energy of large volumes of water at low head with no risk of cavitation. In addition, the hydroEngine can be installed at or abovemore » tailwater level, reducing the excavation necessary to build the powerhouse and thus reducing total installed cost and project footprint. Thus, the hydroEngine technology enables a new generation of small hydro installations with low cost of project development, fish-friendly operations, and small project footprint. In September of 2015, Natel Energy formally commissioned its first project installation in Madras, Oregon, installing 1 SLH100 turbine at an existing drop structure on the North Unit Irrigation District (NUID) Main Canal. The water falls between 13.5 feet to 16.5 feet at this structure, depending on flow. The plant has an installed capacity of 250 kW and an expected annual generation of approximately 873 MWh. The plant operates at an annual capacity factor of 40%, and a capacity factor over the irrigation season, or period of available flow, of 80%. Annual capacity factor is calculated as a percentage of plant operating hours relative to a total of 8,760 hours in a year; because the irrigation canal in which the Project is located only runs water from April to October, the available flow capacity factor is higher. Net greenhouse gas reductions from the Monroe Project are estimated to be 602 tCO2/year. The purpose of this report is to provide an overview of the specifications for Natel’s first commissioned project, the project development process, the plant’s performance, project costs, and the construction, installation, and commissioning process. We hope that this report will provide useful context for assessment of the hydroEngine as a viable technology choice for future distributed, low-head hydropower projects, as well as assessment of the bankability, performance, reliability, and cost of the hydroEngine.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gazo, F.M.
1997-12-31
The Philippine geothermal energy development is now considered in a state of maturity. After more than 20 years of geothermal experience, the total geothermal installed capacity in the Philippines reached 1,455 MW (1996) or about 12% of the total installed power plant capacity. This also enabled the Philippines to become the second largest producer of geothermal energy in the world. The country`s track record in harnessing geothermal energy is considered a revelation, as it continues with its vision of {open_quotes}full steam ahead{close_quotes}, originally conceived when commercial geothermal operation started in 1973. It is thus proper and timely to refer tomore » historical highlights and experiences in geothermal energy development for planning and implementation of the country`s geothermal energy program.« less
Data feature: 1996 world nuclear electricity production
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-12-01
Detailed data on electricity supplied by nuclear power reactors in 1996 are provided. Figures from the International Atomic Energy Agency indicate that a total of 32 countries worldwide were operating 441 nuclear power plants with an installed capacity of 350,411 GWe, and that 36 commercial nuclear power plant units in 14 different countries with an aggregate installed capacity of 27,928 GWe were under construction. Worldwide nuclear generated electricity increased by 3.6% from 1995 to 1996, providing 17.3% of the world`s electricity production. Data for individual countries and regional totals, including generation and consumption data by source, are provided for Westernmore » Europe, Eastern Europe, the Commonwealth of Independent States, the Far East, Canada, and the United States. Other information provided includes 1996 commercial startups, decommissioning, reactor load factors, imports and exports, and gross electricity production.« less
Land-Use Requirements for Solar Power Plants in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ong, S.; Campbell, C.; Denholm, P.
2013-06-01
This report provides data and analysis of the land use associated with utility-scale ground-mounted solar facilities, defined as installations greater than 1 MW. We begin by discussing standard land-use metrics as established in the life-cycle assessment literature and then discuss their applicability to solar power plants. We present total and direct land-use results for various solar technologies and system configurations, on both a capacity and an electricity-generation basis. The total area corresponds to all land enclosed by the site boundary. The direct area comprises land directly occupied by solar arrays, access roads, substations, service buildings, and other infrastructure. As ofmore » the third quarter of 2012, the solar projects we analyze represent 72% of installed and under-construction utility-scale PV and CSP capacity in the United States.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barbose, Galen L.; Darghouth, Naïm R.; Millstein, Dev
Now in its eighth edition, Lawrence Berkeley National Laboratory (LBNL)’s Tracking the Sun report series is dedicated to summarizing trends in the installed price of grid-connected solar photovoltaic (PV) systems in the United States. The present report focuses on residential and nonresidential systems installed through year-end 2014, with preliminary trends for the first half of 2015. As noted in the text box below, this year’s report incorporates a number of important changes and enhancements. Among those changes, this year's report focuses solely on residential and nonresidential PV systems; data on utility-scale PV are reported in LBNL’s companion Utility-Scale Solar reportmore » series. Installed pricing trends presented within this report derive primarily from project-level data reported to state agencies and utilities that administer PV incentive programs, solar renewable energy credit (SREC) registration systems, or interconnection processes. In total, data were collected for roughly 400,000 individual PV systems, representing 81% of all U.S. residential and non-residential PV capacity installed through 2014 and 62% of capacity installed in 2014, though a smaller subset of this data were used in analysis.« less
EPA RE-Powering Mapper Completed Installations
The U.S. Environmental Protection Agency (EPA) Office of Land and Emergency Management (OLEM) Office of Communications, Partnerships and Analysis (OCPA) initiated the RE-Powering America's Land Initiative to demonstrate the enormous potential that contaminated lands, landfills, and mine sites provide for developing renewable energy in the United States. Using publically available information, RE-Powering maintains a list of completed renewable energy installations on contaminated sites and landfills. To date, the RE-Powering Initiative has identified 179 renewable energy installations on 171 contaminated lands, landfills, and mine sites, with a cumulative installed capacity of just over 1,124 megawatts (MW) and consistent growth in total installations since the inception of the RE-Powering Initiative. This dataset is current as of April 2016.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-21
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14246-000] KC Hydro LLC of... equipment with total hydraulic capacity of 246 cubic feet per second (cfs) and total installed generating...-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory...
Rooftop Solar Photovoltaic Technical Potential in the United States. A Detailed Assessment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gagnon, Pieter; Margolis, Robert; Melius, Jennifer
2016-01-01
How much energy could be generated if PV modules were installed on all of the suitable roof area in the nation? To answer this question, we first use GIS methods to process a lidar dataset and determine the amount of roof area that is suitable for PV deployment in 128 cities nationwide, containing 23% of U.S. buildings, and provide PV-generation results for a subset of those cities. We then extend the insights from that analysis to the entire continental United States. We develop two statistical models--one for small buildings and one for medium and large buildings--and populate them with geographicmore » variables that correlate with rooftop's suitability for PV. We simulate the productivity of PV installed on the suitable roof area, and present the technical potential of PV on both small buildings and medium/large buildings for every state in the continental US. Within the 128 cities covered by lidar data, 83% of small buildings have a location suitable for a PV installation, but only 26% of the total rooftop area of small buildings is suitable for development. The sheer number of buildings in this class, however, gives small buildings the greatest technical potential. Small building rooftops could accommodate 731 GW of PV capacity and generate 926 TWh/year of PV energy, approximately 65% of rooftop PV's total technical potential. We conclude by summing the PV-generation results for all building sizes and therefore answering our original question, estimating that the total national technical potential of rooftop PV is 1,118 GW of installed capacity and 1,432 TWh of annual energy generation. This equates to 39% of total national electric-sector sales.« less
Rooftop Solar Photovoltaic Technical Potential in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gagnon, Pieter; Margolis, Robert; Melius, Jennifer
2016-01-01
How much energy could we generate if PV modules were installed on all of the suitable roof area in the nation? To answer this question, we first use GIS methods to process a lidar dataset and determine the amount of roof area that is suitable for PV deployment in 128 cities nationwide, containing 23% of U.S. buildings, and provide PV-generation results for a subset of those cities. We then extend the insights from that analysis to the entire continental United States. We develop two statistical models -- one for small buildings and one for medium and large buildings -- andmore » populate them with geographic variables that correlate with rooftop's suitability for PV. We simulate the productivity of PV installed on the suitable roof area, and present the technical potential of PV on both small buildings and medium/large buildings for every state in the continental US. Within the 128 cities covered by lidar data, 83% of small buildings have a location suitable for a PV installation, but only 26% of the total rooftop area of small buildings is suitable for development. The sheer number of buildings in this class, however, gives small buildings the greatest technical potential. Small building rooftops could accommodate 731 GW of PV capacity and generate 926 TWh/year of PV energy, approximately 65% of rooftop PV's total technical potential. We conclude by summing the PV-generation results for all building sizes and therefore answering our original question, estimating that the total national technical potential of rooftop PV is 1,118 GW of installed capacity and 1,432 TWh of annual energy generation. This equates to 39% of total national electric-sector sales.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-20
... generators with a total installed capacity of 408 megawatts; (5) an excavated tailrace and open channel to the lower reservoir; (6) a 138-kilovolt switchyard/ substation; (7) a gravel and sedimentation trap...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... with the power grid. The proposed project would have an average annual generation of 394.0 gigawatt...; (2) the total capacity of the installation would be up to 45,000 kilowatts; (3) shielded underwater...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-30
... turbine generator unit with a total installed capacity of 500 kilowatts; (5) a new 13.2-kilovolt...-foot-long section; (2) an existing impoundment with a normal water surface elevation of 818 feet mean...
Update on Geothermal Direct-Use Installations in the United States
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beckers, Koenraad J; Young, Katherine R; Snyder, Diana M.
Direct-use of geothermal energy currently has limited penetration in the United States, with an estimated installed capacity of about 500 MWth, supplying on the order of 0.01% of the total annual U.S. heat demand (about 30 EJ). We see higher penetration levels in other countries such as Iceland (about 90%) and Hungary (2.5%). An updated database of geothermal direct-use systems in the U.S. has been compiled and analyzed, building upon the Oregon Institute of Technology (OIT) Geo-Heat Center direct-use database. Types of directuse applications examined include hot springs resorts and pools, aquaculture farms, greenhouses, and district heating systems, among others;more » power-generating facilities and ground-source heat pumps were excluded. Where possible, the current operation status, open and close dates, well data, and other technical data were obtained for each entry. The database contains 545 installations, of which 407 are open, 108 are closed, and 30 have an unknown status. Spas are the most common type of installation, accounting for 50% of installations by number. Aquaculture installations (46 out of 407 open installations) account for the largest percentage (26%) of installed capacity in operation (129 MWth out of 501 MWth). Historical deployment curves show the installed capacity significantly increased in the 1970s and 1980s mainly due to development of geothermal district heating, aquaculture, and greenhouse systems. Since the 2000s, geothermal direct-use development appears to have slowed, and the number of sites in operation decreased due to closures. Case studies reveal multiple barriers to geothermal direct-use implementation and operation, including 1) existence of an information gap among stakeholders, developers, and the general public, 2) competition from cheap natural gas, and 3) the family-owned, small-scale nature of businesses might result in discontinuation among generations.« less
47 CFR 1.1409 - Commission consideration of the complaint.
Code of Federal Regulations, 2011 CFR
2011-10-01
... percentage of the total usable space, or the percentage of the total duct or conduit capacity, which is... section: Rate = Space Factor × Cost Where Cost in Urbanized Service Areas = 0.66 × (Net Cost of a Bare... telecommunications carriers: ER29JN01.014 simplified as: ER29JN01.015 If no inner-duct is installed the fraction, “1...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-11
... level (msl); (2) a powerhouse with two reversible pump-turbine units with a total installed capacity of... California Edison located north of the proposed project and to an existing San Diego Gas & Electric Company...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-25
... existing brick and masonry powerhouse with two new turbine generating units with a total installed capacity... existing 650-foot-long, 50-foot-wide intake canal; (6) an existing brick and masonry powerhouse with two...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... with the power grid. The proposed project would have an average annual generation of 1,007.0 gigawatt...; (2) the total capacity of the installation would be up to 115,000 kilowatts; (3) shielded underwater...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-05
..., 5.5-acre impoundment with a normal water surface elevation of 1140.4 feet National Geodetic Vertical... (kW) turbine-generating unit and 260-kW turbine-generating unit for a total installed capacity of 400...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... a matrix on the bottom of the river; (2) the total capacity of the installation would be up to 35,000 kilowatts; (3) shielded underwater cables would convey each matrix power to a substation; and (4...
Energy accounting of River Severn tidal power schemes
NASA Astrophysics Data System (ADS)
Roberts, F.
1982-07-01
Energy accounting comparisons are constructed in order to make an economic analysis of three different tidal generating schemes for the Severn River in Britain. The plans included ebb generation, flood generation, and turbine-sluice configurations, and the analysis comprised totaling the energy needed to complete the construction in relation to the projected output. Necessary construction components numbered caissons, shipping locks, embankments, transmission facilities, and turbines, with inputs limited to 1.75%/yr once the installations are completed. The total outputs for the installations were modeled as 12, 18, and 18 TWh/yr, respectively, with a projected lifetime of 120 yr. The least output/input ratio was found to be 10:1, with a highest possible value of 16:1. The energy return is highest with the smallest installation, a factor which is offset by the increased return with larger capacity.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-13
... to; (4) an existing 25-foot-high, 22-foot-square stone-masonry building to house; (5) a new turbine generator unit, with a maximum hydraulic capacity of 5 cubic feet per second (cfs) and total installed...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-10
... water surface elevation of 609 feet mean sea level; (3) an new 54-foot-long by 74-foot-wide powerhouse to contain two new turbine- generator units for a total installed capacity of 5.0 megawatts; (4) a...
Grid-Parity Solar Power for Department of Defense Installations
2014-02-01
MW DC. Installed capacity of panels. Capacity of 1 MW DC. Capacity = 998.4 kWp DC. Photovoltaic Peak Capacity ( Power Delivered). PVSyst... Photovoltaic Annual Output ( Power Delivered) The power delivered to Camp Roberts should match or exceed results simulated using the University of Geneva...FINAL REPORT Grid-Parity Solar Power for Department of Defense Installations ESTCP Project EW-201134 FEBRUARY 2014 John Bender
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-02
...-high, 35-foot-long and one 12-foot-high, 85-foot- long; (6) an existing powerhouse with two new Kaplan turbine generating units, a 215 kilowatt (kW) unit and a 145 kW unit, with a total installed capacity of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-28
... turbine generating unit with an installed capacity of 1.8 megawatts (MW) and hydraulic capacity of 130... turbine generating unit with an installed capacity of 7.0 MW and hydraulic capacity of 370 cfs. The...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bolinger, Mark; Weaver, Samantha; Zuboy, Jarett
Recently announced low-priced power purchase agreements (PPAs) for US utility-scale photovoltaic (PV) projects suggest $50/MWh solar might be viable under certain conditions. To explore this possibility, this paper draws on an increasing wealth of empirical data to analyze trends in three of the most important PPA price drivers: upfront installed project prices, operations, and maintenance (O&M) costs, and capacity factors. Average installed prices among a sample of utility-scale PV projects declined by more than one third (from 5.8/W AC to 3.7/WAC) from the 2007–2009 period through 2013, even as costlier systems with crystalline-silicon modules, sun tracking, and higher inverter loadingmore » ratios (ILRs) have constituted an increasing proportion of total utility-scale PV capacity (all values shown here are in 2013 dollars). Actual and projected O&M costs from a very small sample of projects appear to range from $20–$40/kW AC-year. Furthermore, the average net capacity factor is 30% for projects installed in 2012, up from 24% for projects installed in 2010, owing to better solar resources, higher ILRs, and greater use of tracking among the more recent projects. Based on these trends, a pro-forma financial model suggests that $50/MWh utility-scale PV is achievable using a combination of aggressive-but-achievable technical and financial input parameters (including receipt of the 30% federal investment tax credit). Although the US utility-scale PV market is still young, the rapid progress in the key metrics documented in this paper has made PV a viable competitor against other utility-scale renewable generators, and even conventional peaking generators, in certain regions of the country.« less
Bolinger, Mark; Weaver, Samantha; Zuboy, Jarett
2015-05-22
Recently announced low-priced power purchase agreements (PPAs) for US utility-scale photovoltaic (PV) projects suggest $50/MWh solar might be viable under certain conditions. To explore this possibility, this paper draws on an increasing wealth of empirical data to analyze trends in three of the most important PPA price drivers: upfront installed project prices, operations, and maintenance (O&M) costs, and capacity factors. Average installed prices among a sample of utility-scale PV projects declined by more than one third (from 5.8/W AC to 3.7/WAC) from the 2007–2009 period through 2013, even as costlier systems with crystalline-silicon modules, sun tracking, and higher inverter loadingmore » ratios (ILRs) have constituted an increasing proportion of total utility-scale PV capacity (all values shown here are in 2013 dollars). Actual and projected O&M costs from a very small sample of projects appear to range from $20–$40/kW AC-year. Furthermore, the average net capacity factor is 30% for projects installed in 2012, up from 24% for projects installed in 2010, owing to better solar resources, higher ILRs, and greater use of tracking among the more recent projects. Based on these trends, a pro-forma financial model suggests that $50/MWh utility-scale PV is achievable using a combination of aggressive-but-achievable technical and financial input parameters (including receipt of the 30% federal investment tax credit). Although the US utility-scale PV market is still young, the rapid progress in the key metrics documented in this paper has made PV a viable competitor against other utility-scale renewable generators, and even conventional peaking generators, in certain regions of the country.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-09
... a few types of equipment where quality and efficiency are important: Inverters for solar PV power.... Geothermal. Hydropower. Wind power. Solar power. Both Thailand and the Philippines rank high on ITA's... through resources such as solar, wind energy, hydro and biomass resources. Total installed capacity of the...
Solar heating and hot water system installed at Listerhill, Alabama
NASA Technical Reports Server (NTRS)
1978-01-01
The Solar system was installed into a new building and was designed to provide 79% of the estimated annual space heating load and 59% of the estimated annual potable hot water requirement. The collectors are flat plate, liquid manufactured by Reynolds Metals Company and cover a total area of 2344 square feet. The storage medium is water inhibited with NALCO 2755 and the container is an underground, unpressurized steel tank with a capacity of 5000 gallons. This report describes in considerable detail the solar heating facility and contains detailed drawings of the completed system.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-19
... application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to... total installed capacity of 32,000 kilowatts, (2) a proposed 4,500-foot-long, 230-kilovolt transmission...: yo' Way, Salamanca, NY 14779; phone (716) 945-1790. FERC Contact: Timothy Looney; phone: (202) 502...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-26
...) a 26-foot-long penstock convergence and trifurcation section leading to two Francis and one Kaplan turbine-generating units with a total installed capacity of 10 megawatts (MW); (10) a 75-foot- long, 60...-wide concrete tailrace channel equipped with picket barrier to prevent fish from accessing the turbine...
2016 Data Book Shows Continued Growth of Renewable Electricity | News |
NREL 2016 Data Book Shows Continued Growth of Renewable Electricity News Release: 2016 Data Book Shows Continued Growth of Renewable Electricity January 31, 2018 The 2016 Renewable Energy Data Book shows that U.S. renewable electricity grew to 18.3 percent of total installed capacity and 15.6
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-14
...-high, containing approximately 100 pump/turbine/ generator units having a total installed capacity of...,400 acre- feet at normal water surface elevation of +1,000 feet Project Datum; (2) a lower reservoir..., with a surface area of about 50 acres and volume of approximately 2,400 acre-feet at normal water...
Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jack Q. Richardson
2012-06-28
Final Technical Report for the Recovery Act Project for the Installation of a Low Flow Unit at the Abiquiu Hydroelectric Facility. The Abiquiu hydroelectric facility existed with two each 6.9 MW vertical flow Francis turbine-generators. This project installed a new 3.1 MW horizontal flow low flow turbine-generator. The total plant flow range to capture energy and generate power increased from between 250 and 1,300 cfs to between 75 and 1,550 cfs. Fifty full time equivalent (FTE) construction jobs were created for this project - 50% (or 25 FTE) were credited to ARRA funding due to the ARRA 50% project costmore » match. The Abiquiu facility has increased capacity, increased efficiency and provides for an improved aquatic environment owing to installed dissolved oxygen capabilities during traditional low flow periods in the Rio Chama. A new powerhouse addition was constructed to house the new turbine-generator equipment.« less
Feasibility Study for the Ivano-Frankivsk District Heating Repowering: Analysis of Options
DOE Office of Scientific and Technical Information (OSTI.GOV)
Markel, L.; Popelka, A.; Laskarevsky, V.
2002-03-20
Part of the U.S. Initiative on Joint Implementation with the Ukraine Inter-Ministerial Commission on Climate Change, financed by the US Department of Energy. The project was implemented by a team consisting of the US company SenTech, Inc. and the Ukrainian company Esco-West. The main objective of the effort was to assess available alternatives of Ivano-Frankivsk (I-F) District Heating repowering and provide information for I-F's investment decision process. This study provides information on positive and negative technical and economic aspects of available options. Three options were analyzed for technical merit and economic performance: 1. Installation of cogeneration system based on Gasmore » Turbine (GT) and Heat Recovery Heat Exchanger with thermal capacity of 30 MW and electrical capacity of 13.5 MW. This Option assumes utilization of five existing boilers with total capacity of 221 MW. Existing boilers will be equipped with modern controls. Equipment in this Option was sized for longest operating hours, about 8000 based on the available summer baseload. 2. Installation of Gas Turbine Combined Cycle (GTCC) and Heat Recovery Steam Generator (HRSG) with thermal capacity 45 MW and electrical capacity of 58.7 MW. This Option assumes utilization of five existing boilers with total capacity of 221 MW. Existing boilers will be equipped with modern controls. The equipment was sized for medium, shoulder season thermal load, and some cooling was assumed during the summer operation for extension of operating hours for electricity production. 3. Retrofit of six existing boilers (NGB) with total thermal capacity of 255.9 MW by installation of modern control system and minor upgrades. This option assumes only heat production with minimum investment. The best economic performance and the largest investment cost would result from alternative GTCC. This alternative has positive Net Present Value (NPV) with discount rate lower than about 12%, and has IRR slightly above 12%. The lowest economic results, and the lowest required investment, would result from alternative NGB. This Option's NPV is negative even at 0% discount rate, and would not become positive even by improving some parameters within a reasonable range. The Option with Gas Turbine displays relatively modest results and the NPV is positive for low discount rate, higher price of sold electricity and lower cost of natural gas. The IRR of this alternative is 9.75%, which is not very attractive. The largest influences on the investment are from the cost of electricity sold to the grid, the heat tariff, and the cost of natural gas. Assuming the implementation of the GTCC alternative, the benefit of the project is also reflected in lower Green House Emissions.« less
18 CFR Appendix A to Subpart H of... - Appendix A to Subpart H of Part 35
Code of Federal Regulations, 2011 CFR
2011-04-01
... Rates Pt. 35, Subpt. H, App. A Appendix A to Subpart H of Part 35 Appendix A Standard Screen Format... Reference Seller and Affiliate Capacity A Installed Capacity 19,500 Workpaper. B Long-Term Firm Purchases... Capacity E Installed Capacity 8,000 Workpaper. F Long-Term Firm Purchases 500 Workpaper. G Long-Term Firm...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heeter, J.; Bird, L.; Gelman, R.
Several states are addressing the issue of net metering program caps, which limit the total amount of net metered generating capacity that can be installed in a state or utility service territory. In this analysis, we examine net metering caps to gain perspective on how long net metering will be available in various jurisdictions under current policies. We also surveyed state practices and experience to understand important policy design considerations.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-11
... with a total installed capacity of 1,230 kilowatts; (5) a 1,600-foot-long tailrace canal; (6) a 2.2... intends to prepare a single environmental assessment (EA). Commission staff determined that the issues that need to be addressed in its EA have been adequately identified during the pre-filing period, which...
NASA Astrophysics Data System (ADS)
Kahl, Annelen; Nguyen, Viet-Anh; Bartlett, Stuart; Sossan, Fabrizio; Lehning, Michael
2016-04-01
For a successful distribution strategy of PV installations, it does not suffice to choose the locations with highest annual total irradiance. Attention needs to be given to spatial correlation patterns of insolation to avoid large system-wide variations, which can cause extended deficits in supply or might even damage the electrical network. One alternative goal instead is to seek configurations that provide the smoothest energy production, with the most reliable and predictable supply. Our work investigates several scenarios, each pursuing a different strategy for a future renewable Switzerland without nuclear power. Based on an estimate for necessary installed capacity for solar power [Bartlett, 2015] we first use heuristics to pre-select realistic placements for PV installations. Then we apply optimization methods to find a subset of locations that provides the best possible combined electricity production. For the first part of the selection process, we use a DEM to exclude high elevation zones which would be difficult to access and which are prone to natural hazards. Then we use land surface cover information to find all zones with potential roof area, deemed suitable for installation of solar panels. The optimization employs Principal Component Analysis of satellite derived irradiance data (Surface Incoming Shortwave Radiation (SIS), based on Meteosat Second Generation sensors) to incorporate a spatial aspect into the selection process that does not simply maximize annual total production but rather provides the most robust supply, by combining regions with anti-correlated cloud cover patterns. Depending on the initial assumptions and constraints, the resulting distribution schemes for PV installations vary with respect to required surface area, annual total and lowest short-term production, and illustrate how important it is to clearly define priorities and policies for a future renewable Switzerland.
Global Thermal Power Plants Database: Unit-Based CO2, SO2, NOX and PM2.5 Emissions in 2010
NASA Astrophysics Data System (ADS)
Tong, D.; Qiang, Z.; Davis, S. J.
2016-12-01
There are more than 30,000 thermal power plants now operating worldwide, reflecting a tremendously diverse infrastructure that includes units burning oil, natural gas, coal and biomass and ranging in capacity from <1MW to >1GW. Although the electricity generated by this infrastructure is vital to economic activities across the world, it also produces more CO2 and air pollution emissions than any other industry sector. Here we present a new database of global thermal power-generating units and their emissions as of 2010, GPED (Global Power Emissions Database), including the detailed unit information of installed capacity, operation year, geographic location, fuel type and control measures for more than 70000 units. In this study, we have compiled, combined, and harmonized the available underlying data related to thermal power-generating units (e.g. eGRID of USA, CPED of China and published Indian power plants database), and then analyzed the generating capacity, capacity factor, fuel type, age, location, and installed pollution-control technology in order to determine those units with disproportionately high levels of emissions. In total, this work is of great importance for improving spatial distribution of global thermal power plants emissions and exploring their environmental impacts at global scale.
Three essays on the effect of wind generation on power system planning and operations
NASA Astrophysics Data System (ADS)
Davis, Clay Duane
While the benefits of wind generation are well known, some drawbacks are still being understood as wind power is integrated into the power grid at increasing levels. The primary difference between wind generation and other forms of generation is the intermittent, and somewhat unpredictable, aspect of this resource. The somewhat uncontrollable aspect of wind generation makes it important to consider the relationship between this resource and load, and also how the operation of other non-wind generation resources may be affected. The three essays that comprise this dissertation focus on these and other important issues related to wind generation; leading to an improved understanding of how to better plan for and utilize this resource. The first essay addresses the cost of increased levels of installed wind capacity from both a capacity planning and economic dispatch perspective to arrive at the total system cost of installing a unit of wind capacity. This total includes not only the cost of the wind turbine and associated infrastructure, but also the cost impact an additional unit of wind capacity has on the optimal mix and operation of other generating units in the electricity supply portfolio. The results of the model showed that for all wind expansion scenarios, wind capacity is not cost-effective regardless of the level of the wind production tax credit and carbon prices that were considered. Larger levels of installed wind capacity result in reduced variable cost, but this reduction is not able to offset increases in capital cost, as a unit of installed wind capacity does not result in an equal reduction in other non-wind capacity needs. The second essay develops a methodology to better handle unexpected short term fluctuations in wind generation within the existing power system. The methodology developed in this essay leads to lower expected costs by anticipating and planning for fluctuations in wind generation by focusing on key constraints in the system. The modified methodology achieves expected costs for the UC-ED problem that are as low as the full stochastic model and markedly lower than the deterministic model. The final essay focuses on valuing energy storage located at a wind site through multiple revenue streams, where energy storage is valued from the perspective of a profit maximizing investor. Given the current state of battery storage technology, a battery capacity of zero is optimal in the setting considered in this essay. The results presented in this essay are dependent on a technological breakthrough that substantially reduces battery cost and conclude that allowing battery storage to simultaneously participate in multiple wholesale markets is optimal relative to participating in any one market alone. Also, co-locating battery storage and wind provides value by altering the optimal transmission line capacity to the battery and wind site. This dissertation considers problems of wind integration from an economic perspective and builds on existing work in this area. The economics of wind integration and utilization are important because wind generation levels are already significant and will likely become more so in the future. While this dissertation adds to the existing literature, additional work is needed in this area to ensure wind generation adds as much value to the overall system as possible.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-07
...-foot-tall water intake structure; (2) a 155-foot-wide, 189-foot-long concrete powerhouse containing two turbine-generators each rated at 25 megawatts (MW) for a total installed capacity of 50 MW; (3) a 160-foot... Island dam structure and consist of: (1) A 225-foot-wide, 50-foot-long water intake structure; (2) a 160...
Soil specific re-calibration of water content sensors for a field-scale sensor network
NASA Astrophysics Data System (ADS)
Gasch, Caley K.; Brown, David J.; Anderson, Todd; Brooks, Erin S.; Yourek, Matt A.
2015-04-01
Obtaining accurate soil moisture data from a sensor network requires sensor calibration. Soil moisture sensors are factory calibrated, but multiple site specific factors may contribute to sensor inaccuracies. Thus, sensors should be calibrated for the specific soil type and conditions in which they will be installed. Lab calibration of a large number of sensors prior to installation in a heterogeneous setting may not be feasible, and it may not reflect the actual performance of the installed sensor. We investigated a multi-step approach to retroactively re-calibrate sensor water content data from the dielectric permittivity readings obtained by sensors in the field. We used water content data collected since 2009 from a sensor network installed at 42 locations and 5 depths (210 sensors total) within the 37-ha Cook Agronomy Farm with highly variable soils located in the Palouse region of the Northwest United States. First, volumetric water content was calculated from sensor dielectric readings using three equations: (1) a factory calibration using the Topp equation; (2) a custom calibration obtained empirically from an instrumented soil in the field; and (3) a hybrid equation that combines the Topp and custom equations. Second, we used soil physical properties (particle size and bulk density) and pedotransfer functions to estimate water content at saturation, field capacity, and wilting point for each installation location and depth. We also extracted the same reference points from the sensor readings, when available. Using these reference points, we re-scaled the sensor readings, such that water content was restricted to the range of values that we would expect given the physical properties of the soil. The re-calibration accuracy was assessed with volumetric water content measurements obtained from field-sampled cores taken on multiple dates. In general, the re-calibration was most accurate when all three reference points (saturation, field capacity, and wilting point) were represented in the sensor readings. We anticipate that obtaining water retention curves for field soils will improve the re-calibration accuracy by providing more precise estimates of saturation, field capacity, and wilting point. This approach may serve as an alternative method for sensor calibration in lieu of or to complement pre-installation calibration.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chapman, J.
1994-07-01
This is one of a series of reports that document the steps taken to plan and install a utility-scale windfarm and follow its energy production performance. The reports are intended to help utility planners and others better understand the issues involved in installing and operating a windfarm. This report describes the Zond Victory Garden Phase IV (VGIV) windfarm in the Tehachapi mountain region, 100 miles north of Los Angeles. The Victory Garden series of windfarms were planned and installed and are operated by Zond Systems, Inc. of Tehachapi, California. The VGIV installation, which became operational in stages from January throughmore » June 1990, consists of 98 Vestas V27--225 wind turbines. The total rated capacity is 22 MW with a projected annual average net energy production of 54.3 million kWh/yr, equivalent to an annual capacity factor of 0.28. This energy projection, based on extensive wind resource measurements and an average wind turbine availability of 97%, includes the effects of a number of operational loss factors. The report includes descriptions of the windfarm layout, the wind turbine component, and the electrical layout. Particular attention is paid to one of the most important issues in implementing a windfarm, namely, the wind resource assessment and its use in projecting and updating the expected annual-average energy production of the facility. Also included are details of the planning, construction, and commissioning of the windfarm along with a description of the operations and maintenance procedures employed.« less
Lima, Rodolfo M; Santos, Afonso H M; Pereira, Camilo R S; Flauzino, Bárbara K; Pereira, Ana Cristina O S; Nogueira, Fábio J H; Valverde, José Alfredo R
2018-04-01
Due to the relatively low investment, operation costs, and technical requirements, landfills are still the most widespread alternative for final disposal of municipal solid waste (MSW). The biogas produced in the landfill, a renewable energy source, may be an important alternative for electric power generation. Brazil has a significant number of operating landfills, which receive the most part of the collected MSW. However, the country has only 17 landfill biogas power plants (LBPPs), resulting in about 122 MW of capacity. The United Kingdom, for instance, which is about 3 times smaller than Brazil in population, has 442 LBPPs (corresponding to 1051 MW of capacity). This fact highlights a considerable unexplored potential of landfill biogas in Brazil. It is also important to estimate this potential throughout the country to provide information for the government, researchers and companies in decision making, planning and formulation of public policies regarding this use of landfill biogas. Therefore, this study aims at estimating the spatially distributed potential of landfill biogas production that can be used for electric power generation in Brazil from 2015 to 2045, considering two scenarios: (i) operating sanitary landfills and (ii) hypothetical scenario of Territorial Arrangements (TA) comprising every Brazilian city, considering one landfill per TA. The total installed capacity estimated in 2018 for scenario 1 is about 523 MW and 87% of this number are related to LBPPs bigger than 1 MW. In this same year, the total installed capacity estimated for scenario 2 is 768 MW and 95% of this number are related to LBPPs bigger than 1 MW. These results emphasize that Brazil has a considerable unexplored potential of landfill biogas and the importance of municipal consortiums for MSW management. Copyright © 2017 Elsevier Ltd. All rights reserved.
Geothermal development in the Philippines
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elizagaque, R.F.; Tolentino, B.S.
1982-06-01
The development of geothermal resources and energy in the Philippines is discussed. Philippine National Oil Company-Energy Development Corporation initiated the first semi-commercial generation of geothermal power in July 1977 with the installation of a 3MWe plant. By 1980 the country had 440 MWe on line at Mak-Ban and Tiwi. This placed the Philippines second after the US among countries using geothermal energy for power generation. Before the end of 1981, PNOC-EDC added 6 additional MWe of geothermal power generating capacity to increase the total to 446 MWe. As part of the five-year National Energy Development Programme covering the period 1981-1985,more » additional power plants will be installed in various project areas to increase the share of geothermal power generation from the present 9.8% to 18.6% of the nationwide power-generation total, or the equivalent of 16.6 million barrels of oil per year. (MJF)« less
1980 scrubber highlights: dry-process startups, dual-alkali progress highlight scrubber advances
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1981-06-01
A survey of electric utilities reports scrubbers on 13% of existing capacity and estimates 29% by 1990, but compliance with the New Source Performance Standards may raise the total even higher. Dry scrubbers at two Northern States Power installations show test performances that indicate sound design and report modest manpower requirements. Other utilities are ordering demonstration dry-scrubber units, although orders for wet scrubbers continue to do well. A new dual-alkali scrubber is performing well at three installations in terms of availability and sulfur-dioxide-removal efficiency. A full-scale utility dump site test will identify any hazardous materials in pollution control ash andmore » sludge wastes. (DCK)« less
2012 Market Report on U.S. Wind Technologies in Distributed Applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Orrell, Alice C.; Flowers, L. T.; Gagne, M. N.
2013-08-06
At the end of 2012, U.S. wind turbines in distributed applications reached a 10-year cumulative installed capacity of more than 812 MW from more than 69,000 units across all 50 states. In 2012 alone, nearly 3,800 wind turbines totaling 175 MW of distributed wind capacity were documented in 40 states and in the U.S. Virgin Islands, with 138 MW using utility-scale turbines (i.e., greater than 1 MW in size), 19 MW using mid-size turbines (i.e., 101 kW to 1 MW in size), and 18.4 MW using small turbines (i.e., up to 100 kW in size). Distributed wind is defined inmore » terms of technology application based on a wind project’s location relative to end-use and power-distribution infrastructure, rather than on technology size or project size. Distributed wind systems are either connected on the customer side of the meter (to meet the onsite load) or directly to distribution or micro grids (to support grid operations or offset large loads nearby). Estimated capacity-weighted average costs for 2012 U.S. distributed wind installations was $2,540/kW for utility-scale wind turbines, $2,810/kW for mid-sized wind turbines, and $6,960/kW for newly manufactured (domestic and imported) small wind turbines. An emerging trend observed in 2012 was an increased use of refurbished turbines. The estimated capacity-weighted average cost of refurbished small wind turbines installed in 2012 was $4,080/kW. As a result of multiple projects using utility-scale turbines, Iowa deployed the most new overall distributed wind capacity, 37 MW, in 2012. Nevada deployed the most small wind capacity in 2012, with nearly 8 MW of small wind turbines installed in distributed applications. In the case of mid-size turbines, Ohio led all states in 2012 with 4.9 MW installed in distributed applications. State and federal policies and incentives continued to play a substantial role in the development of distributed wind projects. In 2012, U.S. Treasury Section 1603 payments and grants and loans from the U.S. Department of Agriculture’s Rural Energy for America Program were the main sources of federal funding for distributed wind projects. State and local funding varied across the country, from rebates to loans, tax credits, and other incentives. Reducing utility bills and hedging against potentially rising electricity rates remain drivers of distributed wind installations. In 2012, other drivers included taking advantage of the expiring U.S. Treasury Section 1603 program and a prosperous year for farmers. While 2012 saw a large addition of distributed wind capacity, considerable barriers and challenges remain, such as a weak domestic economy, inconsistent state incentives, and very competitive solar photovoltaic and natural gas prices. The industry remains committed to improving the distributed wind marketplace by advancing the third-party certification process and introducing alternative financing models, such as third-party power purchase agreements and lease-to-own agreements more typical in the solar photovoltaic market. Continued growth is expected in 2013.« less
NASA Astrophysics Data System (ADS)
Vaishnav, Parth; Horner, Nathaniel; Azevedo, Inês L.
2017-09-01
We estimate the lifetime magnitude and distribution of the private and public benefits and costs of currently installed distributed solar PV systems in the United States. Using data for recently-installed systems, we estimate the balance of benefits and costs associated with installing a non-utility solar PV system today. We also study the geographical distribution of the various subsidies that are made available to owners of rooftop solar PV systems, and compare it to distributions of population and income. We find that, after accounting for federal subsidies and local rebates and assuming a discount rate of 7%, the private benefits of new installations will exceed private costs only in seven of the 19 states for which we have data and only if customers can sell excess power to the electric grid at the retail price. These states are characterized by abundant sunshine (California, Texas and Nevada) or by high electricity prices (New York). Public benefits from reduced air pollution and climate change impact exceed the costs of the various subsidies offered system owners for less than 10% of the systems installed, even assuming a 2% discount rate. Subsidies flowed disproportionately to counties with higher median incomes in 2006. In 2014, the distribution of subsidies was closer to that of population income, but subsidies still flowed disproportionately to the better-off. The total, upfront, subsidy per kilowatt of installed capacity has fallen from 5200 in 2006 to 1400 in 2014, but the absolute magnitude of subsidy has soared as installed capacity has grown explosively. We see considerable differences in the balance of costs and benefits even within states, indicating that local factors such as system price and solar resource are important, and that policies (e.g. net metering) could be made more efficient by taking local conditions into account.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-07
... wood-framed powerhouse housing a 3-kilowatt (kW) generating unit run by a water wheel and a 5-kW generating unit run by a 24-inch vertical-shaft propeller turbine for a total installed capacity of 8 kW; and... Edison generator that operates via the water wheel and is operated once a year. The applicant operates...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-30
...-mile-long, 294- acre impoundment with a normal water surface elevation of 200.0 feet NAVD88; (3) a 25...-high trash sluice gate; (6) six 8-foot-wide, 10-foot-high turbine bay headgates with 17.33-foot-high... 640-kilowatt (kW) turbine-generating units for a total installed capacity 1,920 kW; (8) three 11.5...
Recent Photovoltaic Performance Data in the USA (Presentation)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jordan, D.
2014-03-01
This paper presents performance data from nearly 50,000 Photovoltaic systems totaling 1.7 Gigawatts installed capacity in the USA from 2009 to 2012. 90% of the systems performed to within 10% or better of expected performance. Only 2-4% of the data indicate issues significantly affecting the system performance. Special causes of underperformance and their impacts are delineated by reliability category. Delays and interconnections dominate project-related issues particularly in the first year, but total less than 0.5% of all systems. Hardware-related issues are dominated by inverter problems totaling less than 0.4% and underperforming modules to less than 0.1%.
Optical fiber cabling technologies for flexible access network
NASA Astrophysics Data System (ADS)
Tanji, Hisashi
2008-07-01
Fiber-to-the-home (FTTH) outside plant infrastructure should be so designed and constructed as to flexibly deal with increasing subscribers and system evolution to be expected in the future, taking minimization of total cost (CAPEX and OPEX) into consideration. With this in mind, fiber access architectures are reviewed and key technologies on optical fiber and cable for supporting flexible access network are presented. Low loss over wide wavelength (low water peak) and bend-insensitive single mode fiber is a future proof solution. Enhanced separable ribbon facilitates mid-span access to individual fibers in a cable installed, improving fiber utilizing efficiency and flexibility of distribution design. It also contributes to an excellent low PMD characteristic which could be required for video RF overlay system or high capacity long reach metro-access convergence network in the future. Bend-insensitive fiber based cabling technique including field installable connector greatly improves fiber/cable handling in installation and maintenance work.
Final Report- Local Energy Matters: Solar Development in Duluth, Minnesota
DOE Office of Scientific and Technical Information (OSTI.GOV)
Slick, Jodi Lyn
The Local Energy Matters project advanced solar deployment in the City of Duluth, MN- a cold-climate community of 86,000. At the beginning of the project, Duluth had 254.57 kW installed solar capacity with an average cost of 5.04 USD/watt installed in 2014. The project worked with cross-sector stakeholders to benchmark the current market, implement best practices for solar deployment and soft cost reduction, develop pilot deployment programs in residential rooftop, community solar, and commercial/industrial sectors, work with the City of Duluth to determine appropriate sites for utility scale developments, and demonstrate solar pus storage. Over the three years of themore » project, Duluth’s installed residential and commercial solar capacity grew by 344% to 875.9 kW with an additional 702 kW solar garden capacity subscribed by Duluth residents, businesses, and institutions. Installation costs dropped 48% over this timeframe to 4.08 USD/watt installed (exclusive of solar garden construction). This report documents the process used to identify levers for increased solar installation and cost reductions in a nascent cold-climate solar market.« less
World Geothermal Congress WGC-2015
NASA Astrophysics Data System (ADS)
Tomarov, G. V.; Shipkov, A. A.
2016-08-01
This article discusses materials and results of the World Geothermal Congress that was held in Melbourne (Australia) from April 19 to April 25, 2015. Information on the extent and technological features of utilization of geothermal resources for heat supply and power production, as well as in other economic areas, is given. A stable growth in the capacity and number of geothermal power systems that is determined by ecological cleanliness, economic efficiency, and the highest (among renewable energy sources) indicators of installed capacity utilization is shown. It was noted that combined schemes of geothermal power plants (GPPs), such as turbine units of different type (binary units, units with one or two separation pressures, etc.), have become more frequently used to increase the efficiency of utilization of geothermal heat carrier. Actual data determining room heating systems with the total worldwide capacity of nearly 50000 MW thermal (MWt) as the most currently significant segment of consumption of geothermal waters are given. In addition, geothermal resources are also utilized in soil pumps, balneological and sports basins, greenhouse complexes, and other manufactures. It was noted that geological studies were carried out in more than 40 countries, with the development of methods of simulation of tanks for the existing and new geothermal fields. Trends of development and the role of geothermal power engineering in the energy supply of many countries are shown. It was shown that prospects for the development of geothermal power generation are significantly associated with utilization of low-temperature geothermal sources in binary power generating units, as well as with the increase in installed capacity of operating geothermal power plants (GPPs) without drilling additional wells, i.e., by using waste geothermal heat carrier in binary-cycle or combined-cycle power plants. The article provides data on a pilot binary power unit at Pauzhetka GPP and on a promising Russian geothermal project to increase the installed capacity of Mutnovsk GPP (whose current capacity is 50.0 (2 × 25.0) MW of electric power) by 25% by constructing a combined binary-cycle power generating unit on the basis of waste separate utilization.
Status of Net Metering: Assessing the Potential to Reach Program Caps
DOE Office of Scientific and Technical Information (OSTI.GOV)
Heeter, J.; Gelman, R.; Bird, L.
2014-09-01
Several states are addressing the issue of net metering program caps, which limit the total amount of net metered generating capacity that can be installed in a state or utility service territory. In this analysis, we examine net metering caps to gain perspective on how long net metering will be available in various jurisdictions under current policies. We also surveyed state practices and experience to understand important policy design considerations.
Assessment of metal retention in newly constructed highway embankments.
Werkenthin, Moritz; Kluge, Björn; Wessolek, Gerd
2016-12-01
Newly constructed embankments should provide both a specific bearing capacity to enable trafficability in emergency cases and a sufficient pollutant retention capacity to protect the groundwater. A number of lysimeters were installed along the A115 highway to determine total and dissolved metal concentrations in road runoff and in the soil solution of newly constructed embankments. Dissolved concentrations in soil solution of the embankments did not exceed the trigger values of the German legislation. Depending on the metal, total concentrations in soil solution were more than twice as high as dissolved concentrations. The high infiltration rates lead to increased groundwater recharge beneath the embankments (up to 4100 mm a -1 ). Although metal concentrations were not problematic from the legislators' point of view, the elevated infiltration rates beside the road facilitated the transfer of high metal loads into deeper soil layers and potentially into the groundwater as well.
Impact of extreme precipitation events in the Miño-Sil river basin
NASA Astrophysics Data System (ADS)
Fernández-González, Manuel; Añel, Juan Antonio; de la Torre, Laura
2015-04-01
We herein research the impact of extreme rainfall events in the Miño-Sil basin, a heavily dammed basin located in the northwestern Iberian Peninsula. Extreme rainfall events are very important in this basin because with 106 dams it is the most dammed in Spain. These dams are almost exclusively used for hydropower generation, the installed generating capacity reaches more than 2700 MW and represents almost 9% of the total installed electrical generation capacity of the Iberian Peninsula, therefore with a potential impact on the energy market. We research the extreme events of rainfall an their return periods trying to reproduce the past extreme events of rainfall and their time periods to prove the proper functioning of the adapted model, so we can forecast future extreme events of rainfall in the basin. This research tries to optimize the storage of dams and adapt the management to problems as climate change. The results obtained are very relevant for hydroelectric generation because the operation of hydropower system depends primarily on the availability of storaged water.
Deep geothermal resources in the Yangbajing Field, Tibet
DOE Office of Scientific and Technical Information (OSTI.GOV)
Zhao Ping; Jin Jian; Duo Ji
1997-12-31
Since the first well was bored in July 1997 in the Yangbajing geothermal field, more than 80 wells have been drilled. The total of installed capacity is 25.18MWe for geothermal power plant that has generated about 1.0 x 10{sup 9} kWh electricity in all. Temperatures inside shallow reservoir are in the range from 150{degrees}C to 165{degrees}C. No high-temperature field if found below the shallow reservoir in the southern part. In order to enlarge the installed capacity and solve pressure decline in current productive wells, an exploration project of deep geothermal resources has been carried out in the northern part. Themore » highest temperature of 329{degrees}C was detected in well ZK4002 at 1850m depth in 1994. Well ZK4001 drilled in 1996 flows out high-enthalpy thermal fluid at the wellhead, in which the average temperature is 248{degrees}C in the feeding zones. There is a great potential for power generation in the northern part. The exploitation of deep geothermal resources would effect the production of existing wells.« less
75 FR 45099 - U.S. Cleantech Trade & Investment Mission
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-02
... to increase renewable energy capacity. Wind and solar power especially are at the core of a new push... in 2004 to 20 percent by 2020. Also, installed capacity for photovoltaic (PV) power is to increase... solar thermal units are to be installed in buildings by 2020, 80 percent of these in homes. All these...
49 CFR 178.338-11 - Discharge control devices.
Code of Federal Regulations, 2011 CFR
2011-10-01
... water capacity, remote means of automatic closure must be installed at the ends of the cargo tank in at... control system. (ii) On a cargo tank motor vehicle of 3,500 gallons water capacity or less, at least one remote means of automatic closure must be installed on the end of the cargo tank farthest away from the...
75 FR 41157 - U.S. Cleantech Trade & Investment Mission
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-15
... providing the means to increase renewable energy capacity. Wind and solar power especially are at the core... from 6.7 percent in 2004 to 20 percent by 2020. Also, installed capacity for photovoltaic (PV) power is..., 5 million solar thermal units are to be installed in buildings by 2020, 80 percent of these in homes...
ERIC Educational Resources Information Center
Eze, Ogwa Christopher
2015-01-01
This research was conducted to ascertain teachers' and students perception of instructional supervision in relation to capacity building in electrical installation trade in technical colleges. Three research questions and a null hypothesis were employed to guide the study. Descriptive survey was adopted. A 23-item questionnaire was used to elicit…
Model Applications | Distributed Generation Market Demand Model | NREL
. Image of a chart showing annual installed capacity (GWDC) by 2015-2050 Enlarge image Projected national annual DGPV deployment for two hypothetical carbon fees as compared to reference trajectory. National statewide installed capacity (MW) by 2016-2021. Enlarge image The dSolar model was used to assist the Maine
A multipurpose computing center with distributed resources
NASA Astrophysics Data System (ADS)
Chudoba, J.; Adam, M.; Adamová, D.; Kouba, T.; Mikula, A.; Říkal, V.; Švec, J.; Uhlířová, J.; Vokáč, P.; Svatoš, M.
2017-10-01
The Computing Center of the Institute of Physics (CC IoP) of the Czech Academy of Sciences serves a broad spectrum of users with various computing needs. It runs WLCG Tier-2 center for the ALICE and the ATLAS experiments; the same group of services is used by astroparticle physics projects the Pierre Auger Observatory (PAO) and the Cherenkov Telescope Array (CTA). OSG stack is installed for the NOvA experiment. Other groups of users use directly local batch system. Storage capacity is distributed to several locations. DPM servers used by the ATLAS and the PAO are all in the same server room, but several xrootd servers for the ALICE experiment are operated in the Nuclear Physics Institute in Řež, about 10 km away. The storage capacity for the ATLAS and the PAO is extended by resources of the CESNET - the Czech National Grid Initiative representative. Those resources are in Plzen and Jihlava, more than 100 km away from the CC IoP. Both distant sites use a hierarchical storage solution based on disks and tapes. They installed one common dCache instance, which is published in the CC IoP BDII. ATLAS users can use these resources using the standard ATLAS tools in the same way as the local storage without noticing this geographical distribution. Computing clusters LUNA and EXMAG dedicated to users mostly from the Solid State Physics departments offer resources for parallel computing. They are part of the Czech NGI infrastructure MetaCentrum with distributed batch system based on torque with a custom scheduler. Clusters are installed remotely by the MetaCentrum team and a local contact helps only when needed. Users from IoP have exclusive access only to a part of these two clusters and take advantage of higher priorities on the rest (1500 cores in total), which can also be used by any user of the MetaCentrum. IoP researchers can also use distant resources located in several towns of the Czech Republic with a capacity of more than 12000 cores in total.
Klipin, M; Mare, I; Hazelhurst, S; Kramer, B
2014-01-01
Clinical and research data are essential for patient care, research and healthcare system planning. REDCapTM is a web-based tool for research data curatorship developed at Vanderbilt University in Nashville, USA. The Faculty of Health Sciences at the University of the Witwatersrand, Johannesburg South Africa identified the need for a cost effective data management instrument. REDCap was installed as per the user agreement with Vanderbilt University in August 2012. In order to assist other institutions that may lack the in-house Information Technology capacity, this paper describes the installation and support of REDCap and incorporates an analysis of user uptake over the first year of use. We reviewed the staffing requirements, costs of installation, process of installation and necessary infrastructure and end-user requests following the introduction of REDCap at Wits. The University Legal Office and Human Research Ethics Committee were consulted regarding the REDCap end-user agreement. Bi-monthly user meetings resulted in a training workshop in August 2013. We compared our REDCap software user numbers and records before and after the first training workshop. Human resources were recruited from existing staff. Installation costs were limited to servers and security certificates. The total costs to provide a functional REDCap platform was less than $9000. Eighty-one (81) users were registered in the first year. After the first training workshop the user numbers increased by 59 in one month and the total number of active users to 140 by the end of August 2013. Custom software applications for REDCap were created by collaboration between clinicians and software developers. REDCap was installed and maintained at limited cost. A small number of people with defined skills can support multiple REDCap users in two to four hours a week. End user training increased in the number of users, number of projects created and the number of projects moved to production.
The Process of Installing REDCap, a Web Based Database Supporting Biomedical Research
Mare, I.; Hazelhurst, S.; Kramer, B.
2014-01-01
Summary Background Clinical and research data are essential for patient care, research and healthcare system planning. REDCapTM is a web-based tool for research data curatorship developed at Vanderbilt University in Nashville, USA. The Faculty of Health Sciences at the University of the Witwatersrand, Johannesburg South Africa identified the need for a cost effective data management instrument. REDCap was installed as per the user agreement with Vanderbilt University in August 2012. Objectives In order to assist other institutions that may lack the in-house Information Technology capacity, this paper describes the installation and support of REDCap and incorporates an analysis of user uptake over the first year of use. Methods We reviewed the staffing requirements, costs of installation, process of installation and necessary infrastructure and end-user requests following the introduction of REDCap at Wits. The University Legal Office and Human Research Ethics Committee were consulted regarding the REDCap end-user agreement. Bi-monthly user meetings resulted in a training workshop in August 2013. We compared our REDCap software user numbers and records before and after the first training workshop. Results Human resources were recruited from existing staff. Installation costs were limited to servers and security certificates. The total costs to provide a functional REDCap platform was less than $9000. Eighty-one (81) users were registered in the first year. After the first training workshop the user numbers increased by 59 in one month and the total number of active users to 140 by the end of August 2013. Custom software applications for REDCap were created by collaboration between clinicians and software developers. Conclusion REDCap was installed and maintained at limited cost. A small number of people with defined skills can support multiple REDCap users in two to four hours a week. End user training increased in the number of users, number of projects created and the number of projects moved to production. PMID:25589907
About an Extreme Achievable Current in Plasma Focus Installation of Mather Type
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nikulin, V. Ya.; Polukhin, S. N.; Vikhrev, V. V.
A computer simulation and analytical analysis of the discharge process in Plasma Focus has shown that there is an upper limit to the current which can be achieved in Plasma Focus installation of Mather type by only increasing the capacity of the condenser bank. The maximum current achieved for various plasma focus installations of 1 MJ level is discussed. For example, for the PF-1000 (IFPiLM) and 1 MJ Frascati PF, the maximum current is near 2 MA. Thus, the commonly used method of increasing the energy of the PF installation by increasing of the capacity has no merit. Alternative optionsmore » in order to increase the current are discussed.« less
NASA Technical Reports Server (NTRS)
1979-01-01
The solar system, installed in a new building, was designed to provide 52 percent of the estimated annual space heating load and 84 percent of the estimated annual potable hot water requirement. The liquid flat plate collectors are ground-mounted and cover a total area of 5125 square feet. The system will provide supplemental heat for the school's closed-loop water-to-air heat pump system and domestic hot water. The storage medium is water inside steel tanks with a capacity of 11,828 gallons for space heating and 1,600 gallons for domestic hot water. The solar heating facility is described and drawings are presented of the completed system which was declared operational in September 1978, and has functioned successfully since.
Land-use efficiency of big solar.
Hernandez, Rebecca R; Hoffacker, Madison K; Field, Christopher B
2014-01-21
As utility-scale solar energy (USSE) systems increase in size and numbers globally, there is a growing interest in understanding environmental interactions between solar energy development and land-use decisions. Maximizing the efficient use of land for USSE is one of the major challenges in realizing the full potential of solar energy; however, the land-use efficiency (LUE; Wm(-2)) of USSE remains ambiguous. We quantified the capacity-based LUE of 183 USSE installations (>20 MW; planned, under construction, and operating) using California as a case study. In California, USSE installations are concentrated in the Central Valley and interior regions of southern California and have a LUE of 35.0 Wm(-2). The installations occupy approximately 86,000 ha and more land is allocated for photovoltaic schemes (72 294 ha) than for concentrating solar power (13,604 ha). Photovoltaic installations are greater in abundance (93%) than concentrating solar power, but technology type and nameplate capacity has no impact on capacity-based LUE. More USSE installations are on private land (80%) and have a significantly greater LUE (35.8 Wm(-2)) than installations on public land (25.4 Wm(-2)). Our findings can be used to better understand and improve the LUE of USSE, thereby maximizing economic, energetic, and environmental returns on investments.
2011-05-01
Solution for an Historic Building Renovation at the United States Air Force Academy • Abstract Number: 12623 Vandenberg Hall • Thin Film Solar Array • Direct...Phase 1 • Total installed production capacity: 212.320 KW DC • Panels type and quantity: • Unisolar Thin Film Amorphous Silicon Panels • 1210 – Power...Successfully Demonstrating an Integrated Roofing and BIPV Solution for an Historic Building Renovation at the United States Air Force Academy
NASA Astrophysics Data System (ADS)
Dulǎu, Lucian Ioan
2015-12-01
This paper describes the simulation of a microgrid system with storage technologies. The microgrid comprises 6 distributed generators (DGs), 3 loads and a 150 kW storage unit. The installed capacity of the generators is 1100 kW, while the total load demand is 900 kW. The simulation is performed by using a SCADA software, considering the power generation costs, the loads demand and the system's power losses. The generators access the system in order of their power generation cost. The simulation is performed for the entire day.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-01
...-kilowatt (kW) turbine/generator unit; and (2) an approximately 1,290-foot-long, 26-inch-diameter high...); (2) an existing structure which will house a single turbine/generator with an installed capacity of... structure which will house a single turbine/generator unit with an installed capacity of 50 kW; (3) a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-16
... bank of the canal; (4) two turbine-generator units providing a combined installed capacity of 2 MW; (5... powerhouse located on the bank of the Muskingum River opposite the existing lock; (3) two turbine-generator... opposite the existing lock; (3) two turbine-generator units providing a combined installed capacity of 4 MW...
Discussion on the installation checking method of precast composite floor slab with lattice girders
NASA Astrophysics Data System (ADS)
Chen, Li; Jin, Xing; Wang, Yahui; Zhou, Hele; Gu, Jianing
2018-03-01
Based on the installation checking requirements of China’s current standards and the international norms for prefabricated structural precast components, it proposed an installation checking method for precast composite floor slab with lattice girders. By taking an equivalent composite beam consisted of a single lattice girder and the precast concrete slab as the checking object, compression instability stress of upper chords and yield stress of slab distribution reinforcement at the maximum positive moment, tensile yield stress of upper chords, slab normal section normal compression stress and shear instability stress of diagonal bars at the maximum negative moment were checked. And the bending stress and deflection of support beams, strength and compression stability bearing capacity of the vertical support, shear bearing capacity of the bolt and compression bearing capacity of steel tube wall at the bolt were checked at the same time. Every different checking object was given a specific load value and load combination. Application of installation checking method was given and testified by example.
NASA Astrophysics Data System (ADS)
Kaldellis, J. K.; Kostas, P.; Filios, A.
2006-07-01
Autonomous wind power systems are among the most interesting and environmentally friendly technological solutions for the electrification of remote consumers. In many cases, however, the battery contribution to the initial or the total operational cost is found to be dominant, discouraging further penetration of the available wind resource. This is basically the case for areas possessing a medium-low wind potential. On the other hand, several isolated consumers are located in regions having the regular benefit of an abundant and reliable solar energy supply. In this context the present study investigates the possibility of reducing the battery size of a stand-alone wind power installation by incorporating a small photovoltaic generator. For this purpose an integrated energy production installation based exclusively on renewable energy resources is hereby proposed. Subsequently a new numerical algorithm is developed that is able to estimate the appropriate dimensions of a similar system. According to the results obtained by long-term experimental measurements, the introduction of the photovoltaic panels considerably improves the operational and financial behaviour of the complete installation owing to the imposed significant battery capacity diminution. Copyright
DOD fuel cell demonstration program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holcomb, F.H.; Binder, M.J.; Taylor, W.R.
The supply of reliable, cost-effective electric power with minimal environmental impact is a constant concern of Department of Defense (DOD) installation energy personnel. Electricity purchased from the local utility is expensive and represents only about 30% of the original energy input at the generating station due to generation and distribution inefficiencies. Because of master metering and large air conditioning loads, the demand portion of the installation`s electric bill can be in excess of 50% of the total bill. While the electric utilities in the United States have a very good record of reliability, there is significant potential for improving themore » security of electrical power supplied by using on-site power generation. On-site, dispersed power generation can reduce power outages due to weather, terrorist activities, or lack of utility generating capacity. In addition, as increased emphasis is placed on global warming, acid rain, and air pollution in general, the development of clean, highly efficient power producing technologies is not only desirable, but mandatory. Since the majority of central heat plants on U.S. military installations are nearing the end of their useful life, there is an opportunity to replace outdated existing equipment with modem technologies.« less
NASA Astrophysics Data System (ADS)
Lipirodjanapong, Sumate; Namboonruang, Weerapol
2017-07-01
This paper presents the analysis of potential wind speed of electrical power generating using for agriculture in Ratchaburi province, Thailand. The total area is 1,900 square kilometers. First of all, the agriculture electrical load (AEL) data was investigated from all farming districts in Ratchaburi. Subsequently, the load data was analyzed and classified by the load power and energy consumption at individual district. The wind turbine generator (WTG) at capacity rate of 200w, 500w, 1,000w, and 2,000w were adopted to implement for the AEL in each area at wind speed range of 3 to 6 m/s. This paper shows the approach based on the wind speed at individual district to determine the capacity of WTG using the capacitor factor (CF) and the cost of energy (COE) in baht per unit under different WTG value rates. Ten locations for wind station installations are practical investigated. Results show that for instance, the Damnoen Sa-duak (DN-04) one of WTG candidate site is identically significant for economic investment of installing rated WTG. The results of COE are important to determine whether a wind site is good or not.
NASA Astrophysics Data System (ADS)
Kato, Takeyoshi; Sugimoto, Hiroyuki; Suzuoki, Yasuo
We established a procedure for estimating regional electricity demand and regional potential capacity of distributed generators (DGs) by using a grid square statistics data set. A photovoltaic power system (PV system) for residential use and a co-generation system (CGS) for both residential and commercial use were taken into account. As an example, the result regarding Aichi prefecture was presented in this paper. The statistical data of the number of households by family-type and the number of employees by business category for about 4000 grid-square with 1km × 1km area was used to estimate the floor space or the electricity demand distribution. The rooftop area available for installing PV systems was also estimated with the grid-square statistics data set. Considering the relation between a capacity of existing CGS and a scale-index of building where CGS is installed, the potential capacity of CGS was estimated for three business categories, i.e. hotel, hospital, store. In some regions, the potential capacity of PV systems was estimated to be about 10,000kW/km2, which corresponds to the density of the existing area with intensive installation of PV systems. Finally, we discussed the ratio of regional potential capacity of DGs to regional maximum electricity demand for deducing the appropriate capacity of DGs in the model of future electricity distribution system.
Energy Security: Emerging Challenges and Opportunities
2010-08-01
46 Appendix A: Electrical Capacity Margins...options........................................................................................ 21 6 Net electrical capacity compared to the North...Energy Security The Army Energy and Water Campaign Plan for Installations defines energy security as: the capacity to avoid adverse impact of energy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker
The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and communitymore » outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.« less
Hybrid Storage Market Assessment: A JISEA White Paper
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ericson, Sean J.; Rose, Eric; Jayaswal, Harshit
This white paper evaluates which markets are best suited for battery storage and storage hybrids and reviews regulations and incentives that support or impede the implementation of standalone storage and battery hybrids. The costs of battery storage technologies have dropped in recent years, resulting in a seven-fold increase in installed capacity over the last decade (1). These technologies offer an attractive rate of return in some locations; however, cost and regulatory barriers still limit the market for storage. Hybridizing a battery (combining the battery with a generator) can in some instances reduce total system costs and increase value compared tomore » separate installations. The fast ramping and dispatchability of a battery can complement the generator to provide services that neither battery nor generator could provide alone. Battery hybrids also benefit from some policy incentives and may be better able to meet market and regulatory requirements.« less
Reliability and Geographic Trends of 50,000 Photovoltaic Systems in the USA: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jordan, D. C.; Kurtz, S. R.
2014-09-01
This paper presents performance and reliability data from nearly 50,000 photovoltaic (PV) systems totaling 1.7 gigawatts installed capacity in the USA from 2009 to 2012 and their geographic trends. About 90% of the normal systems and about 85% of all systems, including systems with known issues, performed to within 10% or better of expected performance. Although considerable uncertainty may exist due to the nature of the data, hotter climates appear to exhibit some degradation not seen in the more moderate climates. Special causes of underperformance and their impacts are delineated by reliability category. Hardware-related issues are dominated by inverter problemsmore » (totaling less than 0.5%) and underperforming modules (totaling less than 0.1%). Furthermore, many reliability categories show a significant decrease in occurrence from year 1 to subsequent years, emphasizing the need for higher-quality installations but also the need for improved standards development. The probability of PV system damage because of hail is below 0.05%. Singular weather events can have a significant impact such as a single lightning strike to a transformer or the impact of a hurricane. However, grid outages are more likely to have a significant impact than PV system damage when extreme weather events occur.« less
Water budget analysis and management for Bangkok Metropolis, Thailand.
Singkran, Nuanchan
2017-09-01
The water budget of the Bangkok Metropolis system was analyzed using a material flow analysis model. Total imported flows into the system were 80,080 million m 3 per year (Mm 3 y -1 ) including inflows from the Chao Phraya and Mae Klong rivers and rainwater. Total exported flows out of the system were 78,528 Mm 3 y -1 including outflow into the lower Chao Phraya River and tap water (TW) distributed to suburbs. Total rates of stock exchange (1,552 Mm 3 y -1 ) were found in the processes of water recycling, TW distribution, domestic use, swine farming, aquaculture, and paddy fields. Only 21% of the total amount of wastewater (1,255 Mm 3 y -1 ) was collected, with insufficient treatment capacity of about 415 Mm 3 y -1 . Domestic and business (industrial and commercial sectors) areas were major point sources, whereas paddy fields were a major non-point source of wastewater. To manage Bangkok's water budget, critical measures have to be considered. Wastewater treatment capacity and efficiency of wastewater collection should be improved. On-site wastewater treatment plants for residential areas should be installed. Urban planning and land use zoning are suggested to control land use activities. Green technology should be supported to reduce wastewater from farming.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Milligan, Michael; Bloom, Aaron P; Townsend, Aaron
Variable generation (VG) can reduce market prices over time and also the energy that other suppliers can sell in the market. The suppliers that are needed to provide capacity and flexibility to meet the long-term reliability requirements may, therefore, earn less revenue. This chapter discusses the topics of resource adequacy and revenue sufficiency - that is, determining and acquiring the quantity of capacity that will be needed at some future date and ensuring that those suppliers that offer the capacity receive sufficient revenue to recover their costs. The focus is on the investment time horizon and the installation of sufficientmore » generation capability. First, the chapter discusses resource adequacy, including newer methods of determining adequacy metrics. The chapter then focuses on revenue sufficiency and how suppliers have sufficient opportunity to recover their total costs. The chapter closes with a description of the mechanisms traditionally adopted by electricity markets to mitigate the issues of resource adequacy and revenue sufficiency and discusses the most recent market design changes to address these issues.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-17
..., installation of a seat belt warning lamp, and recalibration of the speedometer/odometer to show speed in miles... Theft Protection and Rollaway Prevention: installation of a U.S.-model micro switch in the steering lock...: installation of an information placard containing manufacturer specifications for seating capacity and loading...
49 CFR 195.565 - How do I install cathodic protection on breakout tanks?
Code of Federal Regulations, 2011 CFR
2011-10-01
...) capacity built to API Specification 12F, API Standard 620, or API Standard 650 (or its predecessor Standard 12C), you must install the system in accordance with API Recommended Practice 651. However, installation of the system need not comply with API Recommended Practice 651 on any tank for which you note in...
49 CFR 195.565 - How do I install cathodic protection on breakout tanks?
Code of Federal Regulations, 2014 CFR
2014-10-01
...) capacity built to API Specification 12F, API Standard 620, or API Standard 650 (or its predecessor Standard 12C), you must install the system in accordance with API Recommended Practice 651. However, installation of the system need not comply with API Recommended Practice 651 on any tank for which you note in...
49 CFR 195.565 - How do I install cathodic protection on breakout tanks?
Code of Federal Regulations, 2013 CFR
2013-10-01
...) capacity built to API Specification 12F, API Standard 620, or API Standard 650 (or its predecessor Standard 12C), you must install the system in accordance with API Recommended Practice 651. However, installation of the system need not comply with API Recommended Practice 651 on any tank for which you note in...
49 CFR 195.565 - How do I install cathodic protection on breakout tanks?
Code of Federal Regulations, 2012 CFR
2012-10-01
...) capacity built to API Specification 12F, API Standard 620, or API Standard 650 (or its predecessor Standard 12C), you must install the system in accordance with API Recommended Practice 651. However, installation of the system need not comply with API Recommended Practice 651 on any tank for which you note in...
49 CFR 195.565 - How do I install cathodic protection on breakout tanks?
Code of Federal Regulations, 2010 CFR
2010-10-01
...) capacity built to API Specification 12F, API Standard 620, or API Standard 650 (or its predecessor Standard 12C), you must install the system in accordance with API Recommended Practice 651. However, installation of the system need not comply with API Recommended Practice 651 on any tank for which you note in...
Dynamic load testing on the bearing capacity of prestressed tubular concrete piles in soft ground
NASA Astrophysics Data System (ADS)
Yu, Chuang; Liu, Songyu
2008-11-01
Dynamic load testing (DLT) is a high strain test method for assessing pile performance. The shaft capacity of a driven PTC (prestressed tubular concrete) pile in marine soft ground will vary with time after installation. The DLT method has been successfully transferred to the testing of prestressed pipe piles in marine soft clay of Lianyungang area in China. DLT is investigated to determine the ultimate bearing capacity of single pile at different period after pile installation. The ultimate bearing capacity of single pile was founded to increase more than 70% during the inventing 3 months, which demonstrate the time effect of rigid pile bearing capacity in marine soft ground. Furthermore, the skin friction and axial force along the pile shaft are presented as well, which present the load transfer mechanism of pipe pile in soft clay. It shows the economy and efficiency of DLT method compared to static load testing method.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ardani, Kristen; O'Shaughnessy, Eric; Fu, Ran
2016-12-01
In this report, we fill a gap in the existing knowledge about PV-plus-storage system costs and value by providing detailed component- and system-level installed cost benchmarks for residential systems. We also examine other barriers to increased deployment of PV-plus-storage systems in the residential sector. The results are meant to help technology manufacturers, installers, and other stakeholders identify cost-reduction opportunities and inform decision makers about regulatory, policy, and market characteristics that impede solar plus storage deployment. In addition, our periodic cost benchmarks will document progress in cost reductions over time. To analyze costs for PV-plus-storage systems deployed in the first quartermore » of 2016, we adapt the National Renewable Energy Laboratory's component- and system-level cost-modeling methods for standalone PV. In general, we attempt to model best-in-class installation techniques and business operations from an installed-cost perspective. In addition to our original analysis, model development, and review of published literature, we derive inputs for our model and validate our draft results via interviews with industry and subject-matter experts. One challenge to analyzing the costs of PV-plus-storage systems is choosing an appropriate cost metric. Unlike standalone PV, energy storage lacks universally accepted cost metrics, such as dollars per watt of installed capacity and lifetime levelized cost of energy. We explain the difficulty of arriving at a standard approach for reporting storage costs and then provide the rationale for using the total installed costs of a standard PV-plus-storage system as our primary metric, rather than using a system-size-normalized metric.« less
2012 Market Report on Wind Technologies in Distributed Applications
DOE Office of Scientific and Technical Information (OSTI.GOV)
Orrell, Alice C.
2013-08-01
An annual report on U.S. wind power in distributed applications – expanded to include small, mid-size, and utility-scale installations – including key statistics, economic data, installation, capacity, and generation statistics, and more.
NASA Astrophysics Data System (ADS)
Afshari, E.; Afshari, S.
2005-12-01
This paper presents achievements of a twelve years ongoing project expansion of sugar cane- industries as a major agricultural development in Ahvaz, IRAN. The entire project is divided in to seven units and each unit provides irrigation water for 30,000 acres of sugar cane farms in Ahwaz. Absou Inc. is one of the consulting firms that is in charge of design and overseeing installation of irrigation system as well as the development of lands for sugar-cane cultivation at one of the units, called Farabi unit .In general, the mission of project is to Pump fresh water from Karoon River and direct it to the sugar cane farm for irrigation. In particular, the task of design and installation include, (1) build a pumping station at Karoon River with capacity of 1271 ft3/sec, (2) transfer water by main channel from Karoon rive to the farm site 19 miles (3) install a secondary pumping stations which direct water from main channel to drainage pipes and provides water for local farms (4) build a secondary channels which carries water with pipe lines with total length of 42 miles and diameter of 16 to 32 inch. (5) install drainage pump stations and collectors (6) level the ground surface and prepare it for irrigation (7) build railroad for carrying sugar canes (23 miles). Thus far, more than 15,000 acres of farm in Farabi unit is under sugar cane cultivation. The presentation will illustrate more details about different aspects of the project including design, installation and construction phases.
Use of pile driving analysis for assessment of axial load capacity of piles.
DOT National Transportation Integrated Search
2012-05-01
Driven piles are commonly used in foundation engineering. Pile driving formulae, which directly relate the pile set per blow : to the capacity of the pile, are commonly used to decide whether an installed pile will have the designed capacity. However...
Use of Pile Driving Analysis for Assessment of Axial Load Capacity of Piles
DOT National Transportation Integrated Search
2012-05-01
Driven piles are commonly used in foundation engineering. Pile driving formulae, which directly relate the pile set per blow : to the capacity of the pile, are commonly used to decide whether an installed pile will have the designed capacity. However...
14 CFR 25.1310 - Power source capacity and distribution.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Power source capacity and distribution. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment General § 25.1310 Power source capacity and distribution. (a) Each installation whose functioning is required for type...
14 CFR 25.1310 - Power source capacity and distribution.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Power source capacity and distribution. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment General § 25.1310 Power source capacity and distribution. (a) Each installation whose functioning is required for type...
14 CFR 25.1310 - Power source capacity and distribution.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Power source capacity and distribution. 25... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment General § 25.1310 Power source capacity and distribution. (a) Each installation whose functioning is required for type...
Geothermal Energy: Prospects and Problems
ERIC Educational Resources Information Center
Ritter, William W.
1973-01-01
An examination of geothermal energy as a means of increasing the United States power resources with minimal pollution problems. Developed and planned geothermal-electric power installations around the world, capacities, installation dates, etc., are reviewed. Environmental impact, problems, etc. are discussed. (LK)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-31
... Turnbull Drop Project, the applicant proposes to (1) change the hydraulic capacity from 600 cfs to 750 cfs... hydraulic capacity from 600 cfs to 750 cfs; (2) change the authorized installed capacity from 4,100 kW to 5...
14 CFR 23.1310 - Power source capacity and distribution.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Power source capacity and distribution. 23... Equipment General § 23.1310 Power source capacity and distribution. (a) Each installation whose functioning... power supply system, distribution system, or other utilization system. (b) In determining compliance...
14 CFR 23.1310 - Power source capacity and distribution.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Power source capacity and distribution. 23... Equipment General § 23.1310 Power source capacity and distribution. (a) Each installation whose functioning... power supply system, distribution system, or other utilization system. (b) In determining compliance...
14 CFR 23.1310 - Power source capacity and distribution.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Power source capacity and distribution. 23... Equipment General § 23.1310 Power source capacity and distribution. (a) Each installation whose functioning... power supply system, distribution system, or other utilization system. (b) In determining compliance...
Renewable energy projects in the Dominican Republic
DOE Office of Scientific and Technical Information (OSTI.GOV)
Viani, B.
1997-12-01
This paper describes a US/Dominican Republic program to develop renewable energy projects in the country. The objective is to demonstrate the commercial viability of renewable energy generation projects, primarily small-scale wind and hydropower. Preliminary studies are completed for three micro-hydro projects with a total capacity of 262 kWe, and two small wind power projects for water pumping. In addition wind resource assessment is ongoing, and professional training and technical assistance to potential investors is ongoing. Projects goals include not less than ten small firms actively involved in installation of such systems by September 1998.
Optimal investments in digital communication systems in primary exchange area
NASA Astrophysics Data System (ADS)
Garcia, R.; Hornung, R.
1980-11-01
Integer linear optimization theory, following Gomory's method, was applied to the model planning of telecommunication networks in which all future investments are made in digital systems only. The integer decision variables are the number of digital systems set up on cable or radiorelay links that can be installed. The objective function is the total cost of the extension of the existing line capacity to meet the demand between primary and local exchanges. Traffic volume constraints and flow conservation in transit nodes complete the model. Results indicating computing time and method efficiency are illustrated by an example.
Solar project description for Perl-Mack Enterprises' single family residences, Denver, Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-08-21
The Perl-Mack Enterprises Co. solar energy system(s) are installed in a total of 25 single family dwellings located in Denver, Colorado. The 25 dwellings are of three different configurations. Two of the twenty-five dwellings have been fully instrumented for performance monitoring and evaluation since September 1977. All the solar systems are designed to provide approximately 69 percent of the space heating and energy requirements for each dwelling. Solar energy is collected by an array of flat plate collectors having a gross area of 470 square feet. A water-glycol mixture is used as the medium for delivering solar heat from themore » collection to the storage tank. The storage tank has a total capacity of 945 gallons. A liquid-to-liquid heat exchanger, within the storage tank, transfers the stored heat from the transfer medium to the domestic hot water tank of the house. Space heating demands are met by circulating heated water/glycol mixture from the storage tank through the heat exchanger coil installed downstream from the auxiliary furnace blower. The auxiliary gas-fired furnace is activated whenever room thermostat demands heat.« less
Assessment of Rooftop Area in Austin Energy's Service Territory Suitable for PV Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiese, Steven M.
The objective of this project was to create a model for assessing the amount of rooftop area on commercial, industrial, institutional, and governmental buildings in Austin Energy's service area suitable for solar electric energy development and, based on this model, determine the potential installed capacity and annual energy production from solar electric installations on the rooftops of these buildings. Key questions addressed by this project were: 1.What is the aggregate rooftop area, rooftop area suitable for PV project development, and potential for PV capacity and energy production from rooftop solar photovoltaic systems on key building types in Austin Energy's servicemore » area? 2.How do the potential capacity and annual energy production from rooftop solar electric systems compare with Austin Energy's current capacity and annual energy requirements?« less
49 CFR 192.201 - Required capacity of pressure relieving and limiting stations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... Design of Pipeline Components § 192.201 Required capacity of pressure relieving and limiting stations. (a) Each pressure relief station or pressure limiting station or group of those stations installed to... 49 Transportation 3 2012-10-01 2012-10-01 false Required capacity of pressure relieving and...
49 CFR 192.201 - Required capacity of pressure relieving and limiting stations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... Design of Pipeline Components § 192.201 Required capacity of pressure relieving and limiting stations. (a) Each pressure relief station or pressure limiting station or group of those stations installed to... 49 Transportation 3 2011-10-01 2011-10-01 false Required capacity of pressure relieving and...
49 CFR 192.201 - Required capacity of pressure relieving and limiting stations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Design of Pipeline Components § 192.201 Required capacity of pressure relieving and limiting stations. (a) Each pressure relief station or pressure limiting station or group of those stations installed to... 49 Transportation 3 2013-10-01 2013-10-01 false Required capacity of pressure relieving and...
49 CFR 192.201 - Required capacity of pressure relieving and limiting stations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Design of Pipeline Components § 192.201 Required capacity of pressure relieving and limiting stations. (a) Each pressure relief station or pressure limiting station or group of those stations installed to... 49 Transportation 3 2014-10-01 2014-10-01 false Required capacity of pressure relieving and...
46 CFR 112.55-15 - Capacity of storage batteries.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Capacity of storage batteries. 112.55-15 Section 112.55... LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-15 Capacity of storage batteries. (a) A storage battery for an emergency lighting and power system must have the capacity— (1) To close all...
46 CFR 112.55-15 - Capacity of storage batteries.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Capacity of storage batteries. 112.55-15 Section 112.55... LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-15 Capacity of storage batteries. (a) A storage battery for an emergency lighting and power system must have the capacity— (1) To close all...
46 CFR 112.55-15 - Capacity of storage batteries.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Capacity of storage batteries. 112.55-15 Section 112.55... LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-15 Capacity of storage batteries. (a) A storage battery for an emergency lighting and power system must have the capacity— (1) To close all...
46 CFR 112.55-15 - Capacity of storage batteries.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Capacity of storage batteries. 112.55-15 Section 112.55... LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-15 Capacity of storage batteries. (a) A storage battery for an emergency lighting and power system must have the capacity— (1) To close all...
46 CFR 112.55-15 - Capacity of storage batteries.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Capacity of storage batteries. 112.55-15 Section 112.55... LIGHTING AND POWER SYSTEMS Storage Battery Installation § 112.55-15 Capacity of storage batteries. (a) A storage battery for an emergency lighting and power system must have the capacity— (1) To close all...
Code of Federal Regulations, 2011 CFR
2011-07-01
... BASE CLOSURE COMMUNITIES AND COMMUNITY ASSISTANCE-COMMUNITY REDEVELOPMENT AND HOMELESS ASSISTANCE § 176... Liability Act (42 U.S.C. 9601 et seq.). Communities in the vicinity of the installation. The communities... serving in that capacity, the communities in the vicinity of the installation are deemed to be those...
Code of Federal Regulations, 2010 CFR
2010-07-01
... BASE CLOSURE COMMUNITIES AND COMMUNITY ASSISTANCE-COMMUNITY REDEVELOPMENT AND HOMELESS ASSISTANCE § 176... Liability Act (42 U.S.C. 9601 et seq.). Communities in the vicinity of the installation. The communities... serving in that capacity, the communities in the vicinity of the installation are deemed to be those...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Yilmaz, A.O.
Total coal reserve (hard coal + lignite) in the world is 984 billion tons. While hard coal constitutes 52% of the total reserve, lignite constitutes 48% of it. Turkey has only 0.1% of world hard coal reserve and 1.5% of world lignite reserves. Turkey has 9th order in lignite reserve, 8th order in lignite production, and 12th order in total coal (hard coal and lignite) consumption. While hard coal production meets only 13% of its consumption, lignite production meets lignite consumption in Turkey. Sixty-five percent of produced hard coal and 78% of produced lignite are used for electricity generation. Lignitesmore » are generally used for electricity generation due to their low quality. As of 2003, total installed capacity of Turkey was 35,587 MW, 19% (6,774 MW) of which is produced from coal-based thermal power plants. Recently, use of natural gas in electricity generation has increased. While the share of coal in electricity generation was about 50% for 1986, it is replaced by natural gas today.« less
29 CFR 1910.254 - Arc welding and cutting.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 80 volts. (c) Installation of arc welding equipment—(1) General. Installation including power supply... mechanically strong and electrically adequate for the required current. (3) Supply connections and conductors...-carrying capacity of the supply conductors shall be not less than the rated primary current of the welding...
Geothermal Technologies Program - Geothermal Energy: Putting Creative Ideas to Work (Green Jobs)
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2010-06-01
Rapid expansion of U.S. geothermal capacity is opening new job opportunities across the nation. With more than 3,000 megawatts (MW) already installed, the United States leads the world in existing geothermal capacity.
2009-01-16
CAPE CANAVERAL, Fla. – In high bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a ballast assembly is lifted toward the Ares I-X segments for installation. These ballast assemblies will be installed in the upper stage 1 and 7 segments and will mimic the mass of the fuel. Their total weight is approximately 160,000 pounds. Ares I-X is the test vehicle for the Ares I, which is part of the Constellation Program to return men to the moon and beyond. Ares I is the essential core of a safe, reliable, cost-effective space transportation system that eventually will carry crewed missions back to the moon, on to Mars and out into the solar system. Ares I may also use its 25-ton payload capacity to deliver resources and supplies to the International Space Station, or to "park" payloads in orbit for retrieval by other spacecraft bound for the moon or other destinations. The Ares I-X is targeted for launch in July 2009. Photo credit: NASA/Dimitri Gerondidakis
Evaluation of Wind Energy Production in Texas using Geographic Information Systems (GIS)
NASA Astrophysics Data System (ADS)
Ferrer, L. M.
2017-12-01
Texas has the highest installed wind capacity in the United States. The purpose of this research was to estimate the theoretical wind turbine energy production and the utilization ratio of wind turbines in Texas. Windfarm data was combined applying Geographic Information System (GIS) methodology to create an updated GIS wind turbine database, including location and technical specifications. Applying GIS diverse tools, the windfarm data was spatially joined with National Renewable Energy Laboratory (NREL) wind data to calculate the wind speed at each turbine hub. The power output for each turbine at the hub wind speed was evaluated by the GIS system according the respective turbine model power curve. In total over 11,700 turbines are installed in Texas with an estimated energy output of 60 GWh per year and an average utilization ratio of 0.32. This research indicates that applying GIS methodologies will be crucial in the growth of wind energy and efficiency in Texas.
Development by Design: Mitigating Wind Development's Impacts on Wildlife in Kansas
Obermeyer, Brian; Manes, Robert; Kiesecker, Joseph; Fargione, Joseph; Sochi, Kei
2011-01-01
Wind energy, if improperly sited, can impact wildlife through direct mortality and habitat loss and fragmentation, in contrast to its environmental benefits in the areas of greenhouse gas, air quality, and water quality. Fortunately, risks to wildlife from wind energy may be alleviated through proper siting and mitigation offsets. Here we identify areas in Kansas where wind development is incompatible with conservation, areas where wind development may proceed but with compensatory mitigation for impacts, and areas where development could proceed without the need for compensatory mitigation. We demonstrate that approximately 10.3 million ha in Kansas (48 percent of the state) has the potential to provide 478 GW of installed capacity while still meeting conservation goals. Of this total, approximately 2.7 million ha would require no compensatory mitigation and could produce up to 125 GW of installed capacity. This is 1,648 percent higher than the level of wind development needed in Kansas by 2030 if the United States is to get 20 percent of its electricity from wind. Projects that avoid and offset impacts consistent with this analysis could be awarded “Green Certification.” Certification may help to expand and sustain the wind industry by facilitating the completion of individual projects sited to avoid sensitive areas and protecting the industry's reputation as an ecologically friendly source of electricity. PMID:22046333
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hodge, Brian S; Mather, Barry A; Cho, Gyu-Jung
Capacitor banks have been generally installed and utilized to support distribution voltage during period of higher load or on longer, higher impedance, feeders. Installations of distributed energy resources in distribution systems are rapidly increasing, and many of these generation resources have variable and uncertain power output. These generators can significantly change the voltage profile across a feeder, and therefore when a new capacitor bank is needed analysis of optimal capacity and location of the capacitor bank is required. In this paper, we model a particular distribution system including essential equipment. An optimization method is adopted to determine the best capacitymore » and location sets of the newly installed capacitor banks, in the presence of distributed solar power generation. Finally we analyze the optimal capacitor banks configuration through the optimization and simulation results.« less
The Determinant of US Consumers Attitudes toward Solar Energy
ERIC Educational Resources Information Center
Lu, Chao-Lin
2016-01-01
Solar energy provides several significant advantages, such as reduction of the CO[subscript 2] emissions, increase of energy supply diversification, security of energy, and regional/national energy independence. Due to the reduced installation cost and the rapid advances in solar energy technology, the installed capacity of solar power has been…
Optimization Research of Generation Investment Based on Linear Programming Model
NASA Astrophysics Data System (ADS)
Wu, Juan; Ge, Xueqian
Linear programming is an important branch of operational research and it is a mathematical method to assist the people to carry out scientific management. GAMS is an advanced simulation and optimization modeling language and it will combine a large number of complex mathematical programming, such as linear programming LP, nonlinear programming NLP, MIP and other mixed-integer programming with the system simulation. In this paper, based on the linear programming model, the optimized investment decision-making of generation is simulated and analyzed. At last, the optimal installed capacity of power plants and the final total cost are got, which provides the rational decision-making basis for optimized investments.
Geothermal steam condensate reinjection
NASA Technical Reports Server (NTRS)
Chasteen, A. J.
1974-01-01
Geothermal electric generating plants which use condensing turbines and generate and excess of condensed steam which must be disposed of are discussed. At the Geysers, California, the largest geothermal development in the world, this steam condensate has been reinjected into the steam reservoir since 1968. A total of 3,150,000,000 gallons of steam condensate has been reinjected since that time with no noticeable effect on the adjacent producing wells. Currently, 3,700,000 gallons/day from 412 MW of installed capacity are being injected into 5 wells. Reinjection has also proven to be a satisfactory method of disposing of geothermal condensate a Imperial Valley, California, and at the Valles Caldera, New Mexico.
The Land-Use Efficiency of Big Solar
NASA Astrophysics Data System (ADS)
Hernandez, R. R.; Hoffacker, M.; Field, C. B.
2013-12-01
As utility-scale solar energy (USSE) systems increase in size and numbers globally, there is a growing interest in understanding environmental interactions between solar energy development and land-use decisions. Maximizing the efficient use of land for USSE is one of the major challenges in realizing the full potential of solar energy, however, the land-use efficiency (LUE; Wm-2) of USSE remains unknown. We quantified the nominal LUE of 183 USSE installations (> 20 megawatts; planned, under construction, and operating) using California as a case study. In California, we found that USSE installations are concentrated in the Central Valley and desert interior of southern California and have a LUE of 35.01 Wm-2. The installations comprise approximately 86,000 hectares (ha) and more land is allocated for photovoltaic schemes (72,294 ha) than for concentrating solar power (13,604 ha). Photovoltaic installations are greater in abundance (93%) than concentrating solar power, but technology type and nameplate capacity has no impact on LUE. More USSE installations are on private land (80%) and have a significantly greater LUE (35.83 Wm-2) than installations on public land (25.42 Wm-2). We show how LUE can be improved and how co-benefit opportunities can be integrated with USSE enterprises to maximize their economic, energetic, and environmental returns on investment. (Left) The distribution of utility-scale solar energy installations in California (constructed and in progress) by technology type: concentrating solar power and photovoltaic with county lines shown. (Right) The distribution of utility-scale solar energy installations in California (constructed and in progress) by location: public or privately owned land. Larger capacity installations (megawatts) have relatively greater point size.
Performance characteristic of hybrid cooling system based on cooling pad and evaporator
NASA Astrophysics Data System (ADS)
Yoon, J. I.; Son, C. H.; Choi, K. H.; Kim, Y. B.; Sung, Y. H.; Roh, S. J.; Kim, Y. M.; Seol, S. H.
2018-01-01
In South Korea, most of domestic animals such as pigs and chickens might die due to thermal diseases if they are exposed to the high temperature consistently. In order to save them from the heat wave, numerous efforts have been carried out: installing a shade net, adjusting time of feeding, spraying mist and setting up a circulation fan. However, these methods have not shown significant improvements. Thus, this study proposes a hybrid cooling system combining evaporative cooler and air-conditioner in order to resolve the conventional problems caused by the high temperature in the livestock industry. The problem of cooling systems using evaporative cooling pads is that they are not effective for eliminating huge heat load due to their limited capacity. And, temperature of the supplied air cannot be low enough compared to conventional air-conditioning systems. On the other hand, conventional air-conditioning systems require relatively expensive installation cost, and high operating cost compared to evaporative cooling system. The hybrid cooling system makes up for the lack of cooling capacity of the evaporative cooler by employing the conventional air-conditioner. Additionally, temperature of supplied air can be lowered enough. In the hybrid cooling system, induced air by a fan is cooled by the evaporation of water in the cooling pad, and it is cooled again by an evaporator in the air-conditioner. Therefore, the more economical operation is possible due to additionally obtained cooling capacity from the cooling pads. Major results of experimental analysis of hybrid cooling system are as follows. The compressor power consumption of the hybrid cooling system is about 23% lower, and its COP is 17% higher than that of the conventional air-conditioners. Regarding the condition of changing ambient temperature, the total power consumption decreased by about 5% as the ambient temperature changed from 28.7°C to 31.7°C. Cooling capacity and COP also presented about 3% and 1% of minor difference at the same comparison condition.
The changing sensitivity of power systems to meteorological drivers: a case study of Great Britain
NASA Astrophysics Data System (ADS)
Bloomfield, H. C.; Brayshaw, D. J.; Shaffrey, L. C.; Coker, P. J.; Thornton, H. E.
2018-05-01
The increasing use of intermittent renewable generation (such as wind) is increasing the exposure of national power systems to meteorological variability. This study identifies how the integration of wind power in one particular country (Great Britain, GB) is affecting the overall sensitivity of the power system to weather using three key metrics: total annual energy requirement, peak residual load (from sources other than wind) and wind power curtailment. The present-day level of wind power capacity (approximately 15 GW) is shown to have already changed the power system’s overall sensitivity to weather in terms of the total annual energy requirement, from a temperature- to a wind-dominated regime (which occurred with 6GW of installed wind power capacity). Peak residual load from sources other than wind also shows a similar shift. The associated changes in the synoptic- and large-scale meteorological drivers associated with each metric are identified and discussed. In a period where power systems are changing rapidly, it is therefore argued that past experience of the weather impacts on the GB power system may not be a good guide for the impact on the present or near-future power system.
Code of Federal Regulations, 2011 CFR
2011-04-01
... showing daily design capacity and reflecting operation with proposed transmission facilities. A flow diagram showing daily design capacity of all transmission facilities proposed to be installed and operated... engineering design data in explanation and support of the diagrams and the proposed project, setting forth: (i...
Code of Federal Regulations, 2012 CFR
2012-04-01
... showing daily design capacity and reflecting operation with proposed transmission facilities. A flow diagram showing daily design capacity of all transmission facilities proposed to be installed and operated... engineering design data in explanation and support of the diagrams and the proposed project, setting forth: (i...
Code of Federal Regulations, 2010 CFR
2010-04-01
... showing daily design capacity and reflecting operation with proposed transmission facilities. A flow diagram showing daily design capacity of all transmission facilities proposed to be installed and operated... engineering design data in explanation and support of the diagrams and the proposed project, setting forth: (i...
Code of Federal Regulations, 2014 CFR
2014-04-01
... showing daily design capacity and reflecting operation with proposed transmission facilities. A flow diagram showing daily design capacity of all transmission facilities proposed to be installed and operated... engineering design data in explanation and support of the diagrams and the proposed project, setting forth: (i...
Code of Federal Regulations, 2013 CFR
2013-04-01
... showing daily design capacity and reflecting operation with proposed transmission facilities. A flow diagram showing daily design capacity of all transmission facilities proposed to be installed and operated... engineering design data in explanation and support of the diagrams and the proposed project, setting forth: (i...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-04
... submersible turbine/generator unit in the hydro canal bank and provide for seasonal fluctuations of head pond... generating unit would have an installed capacity of 534 kW and an estimated hydraulic capacity of 280 cfs...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bolinger, Mark; Seel, Joachim; LaCommare, Kristina Hamachi
The utility-scale solar sector has led the overall U.S. solar market in terms of installed capacity since 2012. In 2016, the utility-scale sector installed more than 2.5 times as much new capacity as did the residential and commercial sectors combined, and is expected to maintain its dominant position for at least another five years. This report—the fifth edition in an ongoing annual series—provides data-driven analysis of the utility-scale solar project fleet in the United States. We analyze not just installed project prices, but also operating costs, capacity factors, and power purchase agreement ("PPA") prices from a large sample of utility-scalemore » PV and CSP projects throughout the United States. Highlights from this year's edition include the following: Installation Trends: The use of solar tracking devices dominated 2016 installations, at nearly 80% of all new capacity. In a reflection of the ongoing geographic expansion of the market beyond California and the Southwest, the median long-term average insolation level at newly built project sites declined again in 2016. While new fixed-tilt projects are now seen predominantly in less-sunny regions, tracking projects are increasingly pushing into these same regions. The median inverter loading ratio has stabilized in 2016 at 1.3 for both tracking and fixed-tilt projects. Installed Prices: Median installed PV project prices within a sizable sample have fallen by two-thirds since the 2007-2009 period, to $2.2/WAC (or $1.7/WDC) for projects completed in 2016. The lowest 20th percentile of projects within our 2016 sample were priced at or below $2.0/WAC, with the lowest-priced projects around $1.5/WAC. Overall price dispersion across the entire sample and across geographic regions decreased significantly in 2016. Operation and Maintenance (“O&M”) Costs: What limited empirical O&M cost data are publicly available suggest that PV O&M costs were in the neighborhood of $18/kWAC-year, or $8/MWh, in 2016. These numbers include only those costs incurred to directly operate and maintain the generating plant. Capacity Factors: The cumulative net AC capacity factors of individual PV projects range widely, from 15.4% to 35.5%, with a sample median of 26.3%. This project-level variation is based on a number of factors, including the strength of the solar resource at the project site, whether the array is mounted at a fixed-tilt or on a tracking mechanism, the inverter loading ratio, degradation, and curtailment. Changes in at least the first three of these factors drove mean capacity factors higher from 2010- to 2013-vintage projects, where they’ve remained fairly steady among both 2014- and 2015-vintage projects as an ongoing increase in the prevalence of tracking has been offset by a build-out of lower resource sites. Meanwhile, several of the newer CSP projects in the United States are struggling to match long-term performance expectations. PPA Prices: Driven by lower installed project prices and improving capacity factors, levelized PPA prices for utility-scale PV have fallen dramatically over time. Most recent PPAs in our sample are priced at or below $50/MWh levelized, with a few priced as aggressively as ~$30/MWh. Though impressive in pace and scale, these falling PPA prices have been offset to some degree by declining wholesale market value within high penetration markets like California, where in 2016 a MWh of solar generation was worth just 83% of a MWh of flat, round-the-clock generation. At the end of 2016, there were at least 121.4 GW of utility-scale solar power capacity within the interconnection queues across the nation. The growth within these queues is widely distributed across all regions of the country: California and the Southeast each account for 23% of the 83.3 GW of solar that first entered the queues in 2016, followed by the Northeast (17%), the Southwest (16%), the Central region (12%), Texas (6%) and the Northwest (3%). The widening geographic distribution of solar projects is a clear sign that the utility-scale market is maturing and expanding outside of its traditional high-insolation comfort zones.« less
Wind Power in Australia: Overcoming Technological and Institutional Barriers
ERIC Educational Resources Information Center
Healey, Gerard; Bunting, Andrea
2008-01-01
Until recently, Australia had little installed wind capacity, although there had been many investigations into its potential during the preceding decades. Formerly, state-owned monopoly utilities showed only token interest in wind power and could dictate the terms of energy debates. This situation changed in the late 1990s: Installed wind capacity…
Lu, Xi; McElroy, Michael B; Chen, Xinyu; Kang, Chongqing
2014-12-16
Although capacity credits for wind power have been embodied in power systems in the U.S. and Europe, the current planning framework for electricity in China continues to treat wind power as a nondispatchable source with zero contribution to firm capacity. This study adopts a rigorous reliability model for the electric power system evaluating capacity credits that should be recognized for offshore wind resources supplying power demands for Jiangsu, China. Jiangsu is an economic hub located in the Yangtze River delta accounting for 10% of the total electricity consumed in China. Demand for electricity in Jiangsu is projected to increase from 331 TWh in 2009 to 800 TWh by 2030. Given a wind penetration level of 60% for the future additional Jiangsu power supply, wind resources distributed along the offshore region of five coastal provinces in China (Shandong, Jiangsu, Shanghai, Zhejiang, and Fujian) should merit a capacity credit of 12.9%, the fraction of installed wind capacity that should be recognized to displace coal-fired systems without violating the reliability standard. In the high-coal-price scenario, with 60% wind penetration, reductions in CO2 emissions relative to a business as usual reference could be as large as 200.2 million tons of CO2 or 51.8% of the potential addition, with a cost for emissions avoided of $29.0 per ton.
Solar Power. Policy Overview and Good Practices
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cox, Sadie; Walters, Terri; Esterly, Sean
2015-05-01
As global electricity demand increases, governments are designing and implementing policies to scale up and catalyze renewable energy, which now meets 22% of global electricity demand (REN21 2014). Solar technologies are a critical component of this expanded deployment, and they have experienced unprecedented growth in recent years. As presented in Figure 1, solar prices have decreased significantly over the last decade (REN21 2014) and in 2013, new capacity installation of solar electricity from photovoltaics (PV) 1 surpassed all other renewable energy technologies worldwide—excluding hydropower—with 39 gigawatts installed that year. Concentrating solar thermal power,2 although it still represents a fairly nascentmore » market, also continues to expand as installed capacity increased by 36% in 2013 compared to 2012. In addition to meeting energy demand in an increasingly cost-effective manner, solar deployment can also support critical economic, social, and environmental development goals (Flavin and Hull Aeck, n.d.).« less
Committed CO2 Emissions of China's Coal-fired Power Plants
NASA Astrophysics Data System (ADS)
Suqin, J.
2016-12-01
The extent of global warming is determined by the cumulative effects of CO2 in the atmosphere. Coal-fired power plants, the largest anthropogenic source of CO2 emissions, produce large amount of CO2 emissions during their lifetimes of operation (committed emissions), which thus influence the future carbon emission space under specific targets on mitigating climate change (e.g., the 2 degree warming limit relative to pre-industrial levels). Comprehensive understanding of committed CO2 emissions for coal-fired power generators is urgently needed in mitigating global climate change, especially in China, the largest global CO2emitter. We calculated China's committed CO2 emissions from coal-fired power generators installed during 1993-2013 and evaluated their impact on future emission spaces at the provincial level, by using local specific data on the newly installed capacities. The committed CO2 emissions are calculated as the product of the annual coal consumption from newly installed capacities, emission factors (CO2emissions per unit crude coal consumption) and expected lifetimes. The sensitivities about generators lifetimes and the drivers on provincial committed emissions are also analyzed. Our results show that these relatively recently installed coal-fired power generators will lead to 106 Gt of CO2 emissions over the course of their lifetimes, which is more than three times the global CO2 emissions from fossil fuels in 2010. More than 80% (85 Gt) of their total committed CO2 will be emitted after 2013, which are referred to as the remaining emissions. Due to the uncertainties of generators lifetime, these remaining emissions would increase by 45 Gt if the lifetimes of China's coal-fired power generators were prolonged by 15 years. Furthermore, the remaining emissions are very different among various provinces owing to local developments and policy disparities. Provinces with large amounts of secondary industry and abundant coal reserves have higher committed emissions. The national and provincial CO2 emission mitigation objectives might be greatly restricted by existing and planned power plants in China. The policy implications of our results have also been discussed.
Analysis on Voltage Profile of Distribution Network with Distributed Generation
NASA Astrophysics Data System (ADS)
Shao, Hua; Shi, Yujie; Yuan, Jianpu; An, Jiakun; Yang, Jianhua
2018-02-01
Penetration of distributed generation has some impacts on a distribution network in load flow, voltage profile, reliability, power loss and so on. After the impacts and the typical structures of the grid-connected distributed generation are analyzed, the back/forward sweep method of the load flow calculation of the distribution network is modelled including distributed generation. The voltage profiles of the distribution network affected by the installation location and the capacity of distributed generation are thoroughly investigated and simulated. The impacts on the voltage profiles are summarized and some suggestions to the installation location and the capacity of distributed generation are given correspondingly.
Renewable energy and sustainable communities: Alaska's wind generator experience.
Konkel, R Steven
2013-01-01
In 1984, the Alaska Department of Commerce and Economic Development (DCED) issued the State's first inventory/economic assessment of wind generators, documenting installed wind generator capacity and the economics of replacing diesel-fuel-generated electricity. Alaska's wind generation capacity had grown from hundreds of installed kilowatts to over 15.3 megawatts (MW) by January 2012. This article reviews data and conclusions presented in "Alaska's Wind Energy Systems; Inventory and Economic Assessment" (1). (Alaska Department of Commerce and Economic Development, S. Konkel, 1984). It provides a foundation and baseline for understanding the development of this renewable energy source. Today's technologies have evolved at an astonishing pace; a typical generator in an Alaska wind farm now is likely rated at 1.5-MW capacity, compared to the single-kilowatt (kW) machines present in 1984. Installed capacity has mushroomed, illustrated by Unalakleet's 600-kW wind farm dwarfing the original three 10-kW machines included in the 1984 inventory. Kodiak Electric had three 1.5-MW turbines installed at Pillar Mountain in 2009, with three additional turbines of 4.5-MW capacity installed in 2012. Utilities now actively plan for wind generation and compete for state funding. State of Alaska energy policy provides the context for energy project decision-making. Substantial renewable energy fund (REF) awards--$202,000,000 to date for 227 REF projects in the first 5 cycles of funding--along with numerous energy conservation programs--are now in place. Increasing investment in wind is driven by multiple factors. Stakeholders have interests both in public policy and meeting private investment objectives. Wind generator investors should consider project economics and potential impacts of energy decisions on human health. Specifically this article considers: changing environmental conditions in remote Alaska villages, impacts associated with climate change on human health, progress in better understanding wind energy potential through resource assessments and new tools for detailed feasibility and project planning, need for comprehensive monitoring and data analysis, and state funding requirements and opportunity costs. The energy policy choices ahead for Alaska will have important implications for Arctic population health, especially for those villages whose relatively small size and remote locations make energy a key component of subsistence lifestyles and community sustainability. Wind generation can contribute to meeting renewable energy goals and is a particularly important resource for rural and remote Alaskan communities currently dependent on diesel fuel for generating electricity and heat.
Keeping the Future Bright: Department of Defense (DOD) Sustainable Energy Strategy for Installations
2016-04-04
solar photovoltaic ( PV ) energy from a novelty to a mainstream energy source represents another one of the biggest clean energy stories of the past...still slightly more expensive to install than utility-scale PV , distributed solar installation costs decreased in half since 2008, and this power source...capacity will increase in the coming years (See Figure 3)6 Figure 3: Solar PV (Utility Scale) Utility-Scale Median Sy5tem Price —12 10 6 Ibid. Ibid. 9 up
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-09
... storage capacity of 25,000 acre-feet and a surface area of 241 acres at maximum normal water surface... penstocks; (4) a powerhouse with four 250 MW pump/turbines having an installed capacity of approximately... capacity of 25,000 acre-feet and a surface area of 240 acres at maximum normal water surface elevation of 1...
40 CFR 1051.801 - What definitions apply to this part?
Code of Federal Regulations, 2010 CFR
2010-07-01
... CFR part 90, 91, 1048, or 1054, where that engine is installed in a piece of equipment that is covered... CFR part 90, 91, 1048, or 1054, when that engine is installed in a piece of equipment that is covered... rear payload capacity of 350 pounds or more or seating for six or more passengers. Vehicles intended...
Variability of Power from Large-Scale Solar Photovoltaic Scenarios in the State of Gujarat: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Parsons, B.; Hummon, M.; Cochran, J.
2014-04-01
India has ambitious goals for high utilization of variable renewable power from wind and solar, and deployment has been proceeding at a rapid pace. The western state of Gujarat currently has the largest amount of solar generation of any Indian state, with over 855 Megawatts direct current (MWDC). Combined with over 3,240 MW of wind, variable generation renewables comprise nearly 18% of the electric-generating capacity in the state. A new historic 10-kilometer (km) gridded solar radiation data set capturing hourly insolation values for 2002-2011 is available for India. We apply an established method for downscaling hourly irradiance data to one-minutemore » irradiance data at potential PV power production locations for one year, 2006. The objective of this report is to characterize the intra-hour variability of existing and planned photovoltaic solar power generation in the state of Gujarat (a total of 1.9 gigawatts direct current (GWDC)), and of five possible expansion scenarios of solar generation that reflect a range of geographic diversity (each scenario totals 500-1,000 MW of additional solar capacity). The report statistically analyzes one year's worth of power variability data, applied to both the baseline and expansion scenarios, to evaluate diurnal and seasonal power fluctuations, different timescales of variability (e.g., from one to 15 minutes), the magnitude of variability (both total megawatts and relative to installed solar capacity), and the extent to which the variability can be anticipated in advance. The paper also examines how Gujarat Energy Transmission Corporation (GETCO) and the Gujarat State Load Dispatch Centre (SLDC) could make use of the solar variability profiles in grid operations and planning.« less
Sandia National Laboratories: Up on the roof
load of rooftop solar photovoltaic (PV) installations," says structural engineer Steve Dwyer (6912 deemed not strong enough. More load-bearing capacity In two, first-of-their-kind studies funded by DOE's load-bearing capacity for residential rooftop structural systems is several times higher than the
Impact of active and break wind spells on the demand-supply balance in wind energy in India
NASA Astrophysics Data System (ADS)
Kulkarni, Sumeet; Deo, M. C.; Ghosh, Subimal
2018-02-01
With an installed capacity of over 19,000 MW, the wind power currently accounts for almost 70% of the total installed capacity among the renewable energy sector in India. The extraction of wind power mainly depends on prevailing meteorology which is strongly influenced by monsoon variability. The monsoon season is characterized by significant fluctuations in between periods of wet and dry spells. During the dry spells, the demand for power from agriculture and cooling equipment increases, whereas during the wet periods, such demand reduces, although, at the same time, the power supply increases because of strong westerly winds contributing to an enhanced production of wind energy. At this backdrop, we aim to assess the impact of intra-seasonal wind variability on the balance of energy supply and demand during monsoon seasons in India. Further, we explore the probable cause of wind variability by relating it to El Nino events. It is observed that the active and break phases in wind significantly impact the overall wind potential output. Although the dry spells are generally found to reduce the overall wind potential, their impact on the potential seems to have declined after the year 2000. The impact of meteorological changes on variations in wind power studied in this work should find applications typically in taking investment decisions on conventional generation facilities, like thermal, which are currently used to maintain the balance of power supply and demand.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beckers, Koenraad J; Young, Katherine R
Geothermal district heating (GDH) systems have limited penetration in the U.S., with an estimated installed capacity of only 100 MWth for a total of 21 sites. We see higher deployment in other regions, for example, in Europe with an installed capacity of more than 4,700 MWth for 257 GDH sites. The U.S. Department of Energy Geothermal Vision (GeoVision) Study is currently looking at the potential to increase the deployment in the U.S. and to understand the impact of this increased deployment. This paper reviews 31 performance, cost, and financial parameters as input for numerical simulations describing GDH system deployment inmore » support of the GeoVision effort. The focus is on GDH systems using hydrothermal and Enhanced Geothermal System resources in the U.S.; ground-source heat pumps and heat-to-electricity conversion technology were excluded. Parameters investigated include 1) capital and operation and maintenance costs for both subsurface and surface equipment; 2) performance factors such as resource recovery factors, well flow rates, and system efficiencies; and 3) financial parameters such as inflation, interest, and tax rates. Current values as well as potential future improved values under various scenarios are presented. Sources of data considered include academic and popular literature, software tools such as GETEM and GEOPHIRES, industry interviews, and analysis conducted by other task forces for the GeoVision Study, e.g., on the drilling costs and reservoir performance.« less
Introduction to Voigt's wind power plant. [energy conversion efficiency
NASA Technical Reports Server (NTRS)
Tompkin, J.
1973-01-01
The design and operation of a 100 kilowatt wind driven generator are reported. Its high speed three-bladed turbine operates at a height of 50 meters. Blades are rigidly connected to the hub and turbine revolutions change linearly with wind velocity, maintaining a constant speed ratio of blade tip velocity to wind velocity over the full predetermined wind range. Three generators installed in the gondola generate either dc or ac current. Based on local wind conditions, the device has a maximum output of 720 kilowatts at a wind velocity of 16 meters per second. Total electrical capacity is 750 kilowatts, and power output per year is 2,135,000 kilowatt/hours.
Orjuela, Alvaro; Orjuela, Andrea; Lira, Carl T; Miller, Dennis J
2013-07-01
Recovery and purification of organic acids produced in fermentation constitutes a significant fraction of total production cost. In this paper, the design and economic analysis of a process to recover succinic acid (SA) via dissolution and acidification of succinate salts in ethanol, followed by reactive distillation to form succinate esters, is presented. Process simulation was performed for a range of plant capacities (13-55 million kg/yr SA) and SA fermentation titers (50-100 kg/m(3)). Economics were evaluated for a recovery system installed within an existing fermentation facility producing succinate salts at a cost of $0.66/kg SA. For a SA processing capacity of 54.9 million kg/yr and a titer of 100 kg/m(3) SA, the model predicts a capital investment of $75 million and a net processing cost of $1.85 per kg SA. Required selling price of diethyl succinate for a 30% annual return on investment is $1.57 per kg. Copyright © 2013 Elsevier Ltd. All rights reserved.
Game theory competition analysis of reservoir water supply and hydropower generation
NASA Astrophysics Data System (ADS)
Lee, T.
2013-12-01
The total installed capacity of the power generation systems in Taiwan is about 41,000 MW. Hydropower is one of the most important renewable energy sources, with hydropower generation capacity of about 4,540 MW. The aim of this research is to analyze competition between water supply and hydropower generation in water-energy systems. The major relationships between water and energy systems include hydropower generation by water, energy consumption for water system operation, and water consumption for energy system. In this research, a game-theoretic Cournot model is formulated to simulate oligopolistic competition between water supply, hydropower generation, and co-fired power generation in water-energy systems. A Nash equilibrium of the competitive market is derived and solved by GAMS with PATH solver. In addition, a case study analyzing the competition among water supply and hydropower generation of De-ji and Ku-Kuan reservoirs, Taipower, Star Energy, and Star-Yuan power companies in central Taiwan is conducted.
Rooftop solar photovoltaic potential in cities: how scalable are assessment approaches?
NASA Astrophysics Data System (ADS)
Castellanos, Sergio; Sunter, Deborah A.; Kammen, Daniel M.
2017-12-01
Distributed photovoltaics (PV) have played a critical role in the deployment of solar energy, currently making up roughly half of the global PV installed capacity. However, there remains significant unused economically beneficial potential. Estimates of the total technical potential for rooftop PV systems in the United States calculate a generation comparable to approximately 40% of the 2016 total national electric-sector sales. To best take advantage of the rooftop PV potential, effective analytic tools that support deployment strategies and aggressive local, state, and national policies to reduce the soft cost of solar energy are vital. A key step is the low-cost automation of data analysis and business case presentation for structure-integrated solar energy. In this paper, the scalability and resolution of various methods to assess the urban rooftop PV potential are compared, concluding with suggestions for future work in bridging methodologies to better assist policy makers.
C. G. Doris participation in the development of Abu-Al-Bu Koosh Field (in English and French)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
On behalf of the total-ABK group, the company, C.G. Doris, has taken an active part in the development of the gas-lift and water injection installations in the Abu-Al-Bu Koosh Fields. The gas lift platform is a 4-legged jacket in 30 m of water with 2 deck levels. It is joined by a bridge to the production platform. Total load of the new platform is 1000 tons of steel plus 200 tons of piles. The 2 water injection tripods in 41 and 27 m of water also are pile-supported jackets with the vertical and 2 inclined legs. Also, the 2 workovermore » platforms have been thoroughly rechecked by C.G. Doris. Furthermore, a living quarters platform was designed and contracted by the company on a turn-key basis. Capacity is 60 people, with a possibility of expansion.« less
Communications systems technology assessment study. Volume 2: Results
NASA Technical Reports Server (NTRS)
Kelley, R. L.; Khatri, R. K.; Kiesling, J. D.; Weiss, J. A.
1977-01-01
The cost and technology characteristics are examined for providing special satellite services at UHF, 2.5 GHz, and 14/12 GHz. Considered are primarily health, educational, informational and emergency disaster type services. The total cost of each configuration including space segment, earth station, installation operation and maintenance was optimized to reduce the user's total annual cost and establish preferred equipment performance parameters. Technology expected to be available between now and 1985 is identified and comparisons made between selected alternatives. A key element of the study is a survey of earth station equipment updating past work in the field, providing new insight into technology, and evaluating production and test methods that can reduce costs in large production runs. Various satellite configurations were examined. The cost impact of rain attenuation at Ku-band was evaluated. The factors affecting the ultimate capacity achievable with the available orbital arc and available bandwidth were analyzed.
Estimation of composite hydraulic resistance in ice-covered alluvial streams
NASA Astrophysics Data System (ADS)
Ghareh Aghaji Zare, Soheil; Moore, Stephanie A.; Rennie, Colin D.; Seidou, Ousmane; Ahmari, Habib; Malenchak, Jarrod
2016-02-01
Formation, propagation, and recession of ice cover introduce a dynamic boundary layer to the top of rivers during northern winters. Ice cover affects water velocity magnitude and distribution, water level and consequently conveyance capacity of the river. In this research, total resistance, i.e., "composite resistance," is studied for a 4 month period including stable ice cover, breakup, and open water stages in Lower Nelson River (LNR), northern Manitoba, Canada. Flow and ice characteristics such as water velocity and depth and ice thickness and condition were measured continuously using acoustic techniques. An Acoustic Doppler Current Profiler (ADCP) and Shallow Water Ice Profiling Sonar (SWIPS) were installed simultaneously on a bottom mount and deployed for this purpose. Total resistance to the flow and boundary roughness are estimated using measured bulk hydraulic parameters. A novel method is developed to calculate composite resistance directly from measured under ice velocity profiles. The results of this method are compared to the measured total resistance and to the calculated composite resistance using formulae available in literature. The new technique is demonstrated to compare favorably to measured total resistance and to outperform previously available methods.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fischer, J.
2001-07-09
This report summarizes an investigation of the performance of two active desiccant cooling systems that were installed as pilot systems in two locations--a college dormitory and a research laboratory--during the fall of 1999. The laboratory system was assembled in the field from commercially available Trane air-handling modules combined with a standard total energy recovery module and a customized active desiccant wheel, both produced by SEMCO. The dormitory system was a factory-built, integrated system produced by SEMCO that included both active desiccant and sensible-only recovery wheels, a direct-fired gas regeneration section, and a pre-piped Trane heat pump condensing section. Both systemsmore » were equipped with direct digital control systems, complete with full instrumentation and remote monitoring capabilities. This report includes detailed descriptions of these two systems, installation details, samples of actual performance, and estimations of the energy savings realized. These pilot sites represent a continuation of previous active desiccant product development research (Fischer, Hallstrom, and Sand 2000; Fischer 2000). Both systems performed as anticipated, were reliable, and required minimal maintenance. The dehumidification/total-energy-recovery hybrid approach was particularly effective in all respects. System performance showed remarkable improvement in latent load handling capability and operating efficiency compared with the original conventional cooling system and with the conventional system that remained in another, identical wing of the facility. The dehumidification capacity of the pilot systems was very high, the cost of operation was very low, and the system was cost-effective, offering a simple payback for these retrofit installations of approximately 5 to 6 years. Most important, the dormitory system resolved numerous indoor air quality problems in the dormitory by providing effective humidity control and increased, continuous ventilation air.« less
Effect of Check Dams on Erosion and Flow Dynamics on Small Semi-Arid Watersheds
NASA Astrophysics Data System (ADS)
Polyakov, V.; Nearing, M.; Nichols, M.; McClaran, M. P.
2012-12-01
Erosion dynamics in semi-arid environments is defined by high magnitude, low frequency rainfalls that produce runoff with high sediment concentration. Check dams were shown to be an effective sedimentation mitigation technique on small watersheds. Constructed of rocks, or other materials placed across the flow and anchored into the bottom and sides of the channel, these barriers produce upstream and downstream effects. By impounding runoff they reduce flow velocity, increase infiltration and allow sediment settling thus decreasing channel slope. Decreased sediment load downstream of the dam may result in accelerated channel scouring. While the effect of check dams on channel stability has been studied extensively their impact on overall watershed sediment balance is not well known. In 2008 a total of 37 loose rock semi permeable check dams were installed on two small (4.0 and 3.1 ha) watersheds located on the alluvial fan of the Santa Rita Mountains in southern Arizona, USA. Each watershed was equipped with high resolution weighing type rain gauge a supercritical flow flume and sediment sampler. Hyetographs, hydrographs, and sediment load data for the watersheds were collected since 1975. The erosion dynamics and flow characteristics following the check dam installation were compared with historical records. The volume of the sediment retained upstream of each dam was calculated through survey. After 4 years the check dams were filled to over 80% of their capacity and no significant increase in downstream scouring has been observed. Maximum 30-min intensity (I30) was overall best predictor variable for total runoff. After check dam installation the number ratio of runoff to rainfall events has been reduced by half. However, runoff peak rates were not significantly effected.
Study on the bearing capacity of embedded chute on shield tunnel segment
NASA Astrophysics Data System (ADS)
Fanzhen, Zhang; Jie, Bu; Zhibo, Su; Qigao, Hu
2018-05-01
The method of perforation and steel implantation is often used to fix and install pipeline, cables and other facilities in the shield tunnel, which would inevitably do damage to the precast segments. In order to reduce the damage and the resulting safety and durability problems, embedded chute was set at the equipment installation in one shield tunnel. Finite element models of segment concrete and steel are established in this paper. When water-soil pressure calculated separately and calculated together, the mechanical property of segment is studied. The bearing capacity and deformation of segment are analysed before and after embedding the chute. Research results provide a reference for similar shield tunnel segment engineering.
D0 Silicon Upgrade: Lower Cleanroom Roof Quick Load Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rucinski, Russ; /Fermilab
1995-11-17
This engineering note documents calculations done to determine the margin of safety for the lower clean room roof. The analysis was done to give me a feeling of what the loads, stresses and capacity of the roof is prior to installation and installation work to be done for the helium refrigerator upgrade. The result of this quick look showed that the calculated loads produce stress values and loads at about half the allowables. Based on this result, I do not think that special precautions above personal judgement are required for the installation work.
On the possibility of generation of cold and additional electric energy at thermal power stations
NASA Astrophysics Data System (ADS)
Klimenko, A. V.; Agababov, V. S.; Borisova, P. N.
2017-06-01
A layout of a cogeneration plant for centralized supply of the users with electricity and cold (ECCG plant) is presented. The basic components of the plant are an expander-generator unit (EGU) and a vapor-compression thermotransformer (VCTT). At the natural-gas-pressure-reducing stations, viz., gas-distribution stations and gas-control units, the plant is connected in parallel to a throttler and replaces the latter completely or partially. The plant operates using only the energy of the natural gas flow without burning the gas; therefore, it can be classified as a fuelless installation. The authors compare the thermodynamic efficiencies of a centralized cold supply system based on the proposed plant integrated into the thermal power station scheme and a decentralized cold supply system in which the cold is generated by electrically driven vapor-compression thermotransformers installed on the user's premises. To perform comparative analysis, the exergy efficiency was taken as the criterion since in one of the systems under investigation the electricity and the cold are generated, which are energies of different kinds. It is shown that the thermodynamic efficiency of the power supply using the proposed plant proves to be higher within the entire range of the parameters under consideration. The article presents the results of investigating the impact of the gas heating temperature upstream from the expander on the electric power of the plant, its total cooling capacity, and the cooling capacities of the heat exchangers installed downstream from the EGU and the evaporator of the VCTT. The results of calculations are discussed that show that the cold generated at the gas-control unit of a powerful thermal power station can be used for the centralized supply of the cold to the ventilation and conditioning systems of both the buildings of the power station and the neighboring dwelling houses, schools, and public facilities during the summer season.
The Future of Energy from Nuclear Fission
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kim, Son H.; Taiwo, Temitope
Nuclear energy is an important part of our current global energy system, and contributes to supplying the significant demand for electricity for many nations around the world. There are 433 commercial nuclear power reactors operating in 30 countries with an installed capacity of 367 GWe as of October 2011 (IAEA PRIS, 2011). Nuclear electricity generation totaled 2630 TWh in 2010 representing 14% the world’s electricity generation. The top five countries of total installed nuclear capacity are the US, France, Japan, Russia and South Korea at 102, 63, 45, 24, and 21 GWe, respectively (WNA, 2012a). The nuclear capacity of thesemore » five countries represents more than half, 68%, of the total global nuclear capacity. The role of nuclear power in the global energy system today has been motivated by several factors including the growing demand for electric power, the regional availability of fossil resources and energy security concerns, and the relative competitiveness of nuclear power as a source of base-load electricity. There is additional motivation for the use of nuclear power because it does not produce greenhouse gas (GHG) emissions or local air pollutants during its operation and contributes to low levels of emissions throughout the lifecycle of the nuclear energy system (Beerten, J. et. al., 2009). Energy from nuclear fission primarily in the form of electric power and potentially as a source of industrial heat could play a greater role for meeting the long-term growing demand for energy worldwide while addressing the concern for climate change from rising GHG emissions. However, the nature of nuclear fission as a tremendously compact and dense form of energy production with associated high concentrations of radioactive materials has particular and unique challenges as well as benefits. These challenges include not only the safety and cost of nuclear reactors, but proliferation concerns, safeguard and storage of nuclear materials associated with nuclear fuel cycles. In March of 2011, an unprecedented earthquake of 9 magnitude and ensuing tsunami off the east coast of Japan caused a severe nuclear accident in Fukushima, Japan (Prime Minister of Japan and His Cabinet, 2011). The severity of the nuclear accident in Japan has brought about a reinvestigation of nuclear energy policy and deployment activities for many nations around the world, most notably in Japan and Germany (BBC, 2011; Reuter, 2011). The response to the accident has been mixed and its full impact may not be realized for many years to come. The nuclear accident in Fukushima, Japan has not directly affected the significant on-going nuclear deployment activities in many countries. China, Russia, India, and South Korea, as well as others, are continuing with their deployment plans. As of October 2011, China had the most reactors under construction at 27, while Russia, India, and South Korea had 11, 6, and 5 reactors under construction, respectively (IAEA PRIS, 2011). Ten other nations have one or two reactors currently under construction. Many more reactors are planned for future deployment in China, Russia, and India, as well as in the US. Based on the World Nuclear Association’s data, the realization of China’s deployment plan implies that China will surpass the US in total nuclear capacity some time in the future.« less
Schultheis, Eric; Glasmeier, Amy
2015-09-01
Over the last decade, demand for services from military treatment facilities (MTFs) has frequently exceeded capacity resulting in increased usage of off-base civilian Tricare providers (OCTP). This capacity shortage has been particularly acute for mental health care. At many installations, OCTPs are the main source of mental health care for military personnel and their families. Utilizing data on the location of mental health OCTPs and demographic data, we examine the spatial accessibility of mental health OCTPs around five military installations. Variation exists in the spatial accessibility of mental health OCTPs depending on the geographic context of an installation. There is a mild correlation between the number of mental health OTCPs proximate to a base and the beneficiaries enrolled in an MTF. There is a strong correlation between the size of the general population proximate to an installation and the number of mental health OCTMPs present. Installations located in densely populated areas had high ratios of mental health OCTPs to the MTF beneficiary population but not when the civilian demand on these providers was accounted for. This study's findings open several avenues for future research and policy aimed at increasing the effectiveness of the mental health OCTP network. Reprint & Copyright © 2015 Association of Military Surgeons of the U.S.
33 CFR 183.41 - Persons capacity: Outboard boats.
Code of Federal Regulations, 2010 CFR
2010-07-01
... § 183.35 for the boat minus the motor and control weight, battery weight (dry), and full portable fuel... control weight, battery weight, and full portable fuel tank weight, if any, shown in table 4 of subpart H of this part for the maximum horsepower capacity marked on the boat. Permanently installed fuel tanks...
49 CFR 192.201 - Required capacity of pressure relieving and limiting stations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... Design of Pipeline Components § 192.201 Required capacity of pressure relieving and limiting stations. (a) Each pressure relief station or pressure limiting station or group of those stations installed to... part of the pipeline or distribution system in excess of those for which it was designed, or against...
10 CFR 503.6 - Cost calculations for new powerplants and installations.
Code of Federal Regulations, 2014 CFR
2014-01-01
... fuel and the cost of using imported oil is greater than zero. (3) There are two comparative cost...) Assume the energy produced by the powerplant equals seventy (70) percent of design capacity times 8760... being compared, the design capacities or the maximum sustained energy per unit of time that could be...
System solution to improve energy efficiency of HVAC systems
NASA Astrophysics Data System (ADS)
Chretien, L.; Becerra, R.; Salts, N. P.; Groll, E. A.
2017-08-01
According to recent surveys, heating and air conditioning systems account for over 45% of the total energy usage in US households. Three main types of HVAC systems are available to homeowners: (1) fixed-speed systems, where the compressor cycles on and off to match the cooling load; (2) multi-speed (typically, two-speed) systems, where the compressor can operate at multiple cooling capacities, leading to reduced cycling; and (3) variable-speed systems, where the compressor speed is adjusted to match the cooling load of the household, thereby providing higher efficiency and comfort levels through better temperature and humidity control. While energy consumption could reduce significantly by adopting variable-speed compressor systems, the market penetration has been limited to less than 10% of the total HVAC units and a vast majority of systems installed in new construction remains single speed. A few reasons may explain this phenomenon such as the complexity of the electronic circuitry required to vary compressor speed as well as the associated system cost. This paper outlines a system solution to boost the Seasonal Energy Efficiency Rating (SEER) of a traditional single-speed unit through using a low power electronic converter that allows the compressor to operate at multiple low capacity settings and is disabled at high compressor speeds.
Renewable energy and sustainable communities: Alaska's wind generator experience†
Konkel, R. Steven
2013-01-01
Background In 1984, the Alaska Department of Commerce and Economic Development (DCED) issued the State's first inventory/economic assessment of wind generators, documenting installed wind generator capacity and the economics of replacing diesel-fuel-generated electricity. Alaska's wind generation capacity had grown from hundreds of installed kilowatts to over 15.3 megawatts (MW) by January 2012. Method This article reviews data and conclusions presented in “Alaska's Wind Energy Systems; Inventory and Economic Assessment” (1). (Alaska Department of Commerce and Economic Development, S. Konkel, 1984). It provides a foundation and baseline for understanding the development of this renewable energy source. Results Today's technologies have evolved at an astonishing pace; a typical generator in an Alaska wind farm now is likely rated at 1.5-MW capacity, compared to the single-kilowatt (kW) machines present in 1984. Installed capacity has mushroomed, illustrated by Unalakleet's 600-kW wind farm dwarfing the original three 10-kW machines included in the 1984 inventory. Kodiak Electric had three 1.5-MW turbines installed at Pillar Mountain in 2009, with three additional turbines of 4.5-MW capacity installed in 2012. Utilities now actively plan for wind generation and compete for state funding. Discussion State of Alaska energy policy provides the context for energy project decision-making. Substantial renewable energy fund (REF) awards – $202,000,000 to date for 227 REF projects in the first 5 cycles of funding – along with numerous energy conservation programs – are now in place. Increasing investment in wind is driven by multiple factors. Stakeholders have interests both in public policy and meeting private investment objectives. Wind generator investors should consider project economics and potential impacts of energy decisions on human health. Specifically this article considers:changing environmental conditions in remote Alaska villages,impacts associated with climate change on human health,progress in better understanding wind energy potential through resource assessments and new tools for detailed feasibility and project planning,need for comprehensive monitoring and data analysis, andstate funding requirements and opportunity costs. Conclusion The energy policy choices ahead for Alaska will have important implications for Arctic population health, especially for those villages whose relatively small size and remote locations make energy a key component of subsistence lifestyles and community sustainability. Wind generation can contribute to meeting renewable energy goals and is a particularly important resource for rural and remote Alaskan communities currently dependent on diesel fuel for generating electricity and heat. PMID:23971014
28. MESTA STEAM ENGINE, INSTALLED BY THE CORRIGAN, McKINNEY COMPANY ...
28. MESTA STEAM ENGINE, INSTALLED BY THE CORRIGAN, McKINNEY COMPANY IN 1916, STILL DRIVES THE 44-INCH REVERSING BLOOMING MILL. THE TWIN TANDAM, COMPOUND CONDENSING, REVERSING STEAM ENGINE HAS A RATED CAPACITY OF 35,000 H.P. IT WAS BUILT BY THE MESTA MACHINE COMPANY OF PITTSBURGH. - Corrigan, McKinney Steel Company, 3100 East Forty-fifth Street, Cleveland, Cuyahoga County, OH
Tidal Turbine Array Optimization Based on the Discrete Particle Swarm Algorithm
NASA Astrophysics Data System (ADS)
Wu, Guo-wei; Wu, He; Wang, Xiao-yong; Zhou, Qing-wei; Liu, Xiao-man
2018-06-01
In consideration of the resource wasted by unreasonable layout scheme of tidal current turbines, which would influence the ratio of cost and power output, particle swarm optimization algorithm is introduced and improved in the paper. In order to solve the problem of optimal array of tidal turbines, the discrete particle swarm optimization (DPSO) algorithm has been performed by re-defining the updating strategies of particles' velocity and position. This paper analyzes the optimization problem of micrositing of tidal current turbines by adjusting each turbine's position, where the maximum value of total electric power is obtained at the maximum speed in the flood tide and ebb tide. Firstly, the best installed turbine number is generated by maximizing the output energy in the given tidal farm by the Farm/Flux and empirical method. Secondly, considering the wake effect, the reasonable distance between turbines, and the tidal velocities influencing factors in the tidal farm, Jensen wake model and elliptic distribution model are selected for the turbines' total generating capacity calculation at the maximum speed in the flood tide and ebb tide. Finally, the total generating capacity, regarded as objective function, is calculated in the final simulation, thus the DPSO could guide the individuals to the feasible area and optimal position. The results have been concluded that the optimization algorithm, which increased 6.19% more recourse output than experience method, can be thought as a good tool for engineering design of tidal energy demonstration.
A peaking-regulation-balance-based method for wind & PV power integrated accommodation
NASA Astrophysics Data System (ADS)
Zhang, Jinfang; Li, Nan; Liu, Jun
2018-02-01
Rapid development of China’s new energy in current and future should be focused on cooperation of wind and PV power. Based on the analysis of system peaking balance, combined with the statistical features of wind and PV power output characteristics, a method of comprehensive integrated accommodation analysis of wind and PV power is put forward. By the electric power balance during night peaking load period in typical day, wind power installed capacity is determined firstly; then PV power installed capacity could be figured out by midday peak load hours, which effectively solves the problem of uncertainty when traditional method hard determines the combination of the wind and solar power simultaneously. The simulation results have validated the effectiveness of the proposed method.
10 CFR 503.6 - Cost calculations for new powerplants and installations.
Code of Federal Regulations, 2013 CFR
2013-01-01
... fuel and the cost of using imported oil is greater than zero. (3) There are two comparative cost...) percent of design capacity times 8760 hours for each year during the life of the powerplant, and compute... it will in fact expire in that year.) (7) If powerplants are being compared, the design capacities or...
10 CFR 503.6 - Cost calculations for new powerplants and installations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... fuel and the cost of using imported oil is greater than zero. (3) There are two comparative cost...) percent of design capacity times 8760 hours for each year during the life of the powerplant, and compute... it will in fact expire in that year.) (7) If powerplants are being compared, the design capacities or...
10 CFR 503.6 - Cost calculations for new powerplants and installations.
Code of Federal Regulations, 2012 CFR
2012-01-01
... fuel and the cost of using imported oil is greater than zero. (3) There are two comparative cost...) percent of design capacity times 8760 hours for each year during the life of the powerplant, and compute... it will in fact expire in that year.) (7) If powerplants are being compared, the design capacities or...
10 CFR 503.6 - Cost calculations for new powerplants and installations.
Code of Federal Regulations, 2011 CFR
2011-01-01
... fuel and the cost of using imported oil is greater than zero. (3) There are two comparative cost...) percent of design capacity times 8760 hours for each year during the life of the powerplant, and compute... it will in fact expire in that year.) (7) If powerplants are being compared, the design capacities or...
Installation and use of epoxy-grouted rock anchors for skyline logging in southeast Alaska.
W.L. Schroeder; D.N. Swanston
1992-01-01
Field tests of the load-carrying capacity of epoxy-grouted rock anchors in poor quality bedrock on Wrangel Island in southeast Alaska demonstrated the effectiveness of rock anchors as substitutes for stump anchors for logging system guylines. Ultimate capacity depends mainly on rock hardness or strength and length of the imbedded anchor.
The optimization problems of CP operation
NASA Astrophysics Data System (ADS)
Kler, A. M.; Stepanova, E. L.; Maximov, A. S.
2017-11-01
The problem of enhancing energy and economic efficiency of CP is urgent indeed. One of the main methods for solving it is optimization of CP operation. To solve the optimization problems of CP operation, Energy Systems Institute, SB of RAS, has developed a software. The software makes it possible to make optimization calculations of CP operation. The software is based on the techniques and software tools of mathematical modeling and optimization of heat and power installations. Detailed mathematical models of new equipment have been developed in the work. They describe sufficiently accurately the processes that occur in the installations. The developed models include steam turbine models (based on the checking calculation) which take account of all steam turbine compartments and regeneration system. They also enable one to make calculations with regenerative heaters disconnected. The software for mathematical modeling of equipment and optimization of CP operation has been developed. It is based on the technique for optimization of CP operating conditions in the form of software tools and integrates them in the common user interface. The optimization of CP operation often generates the need to determine the minimum and maximum possible total useful electricity capacity of the plant at set heat loads of consumers, i.e. it is necessary to determine the interval on which the CP capacity may vary. The software has been applied to optimize the operating conditions of the Novo-Irkutskaya CP of JSC “Irkutskenergo”. The efficiency of operating condition optimization and the possibility for determination of CP energy characteristics that are necessary for optimization of power system operation are shown.
Collaborative Procurement Initiative
GPP's Clean Energy Collaborative Procurement Initiative provides a platform for deploying clean energy technologies across multiple government and educational organizations for maximum impact on installed solar system capacity and local economic activity.
Airport Capacity Enhancement Plan.
1986-01-01
capacity and efficiency of airports without sacrificing safety and enviromental concerns. PA L. 0t- ~I|| TABLE OF CONTENTS SECTION Page EXECUTIVE...environmental, and socio - political factors. These constraints include the following: * The construction of new airports and the expansion of the...inter-airport conflicts . In New he York, for example, an MLS installation at LaGuardia ns could reduce some arrival route lengths significantly, ’.@rts
30 CFR 56.12067 - Installation of transformers.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Installation of transformers. 56.12067 Section... § 56.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by a substantial fence...
30 CFR 56.12067 - Installation of transformers.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 56.12067 Section... § 56.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by a substantial fence...
30 CFR 57.12067 - Installation of transformers.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...
30 CFR 57.12067 - Installation of transformers.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...
30 CFR 56.12067 - Installation of transformers.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Installation of transformers. 56.12067 Section... § 56.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by a substantial fence...
30 CFR 56.12067 - Installation of transformers.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Installation of transformers. 56.12067 Section... § 56.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by a substantial fence...
30 CFR 57.12067 - Installation of transformers.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...
30 CFR 56.12067 - Installation of transformers.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Installation of transformers. 56.12067 Section... § 56.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by a substantial fence...
30 CFR 57.12067 - Installation of transformers.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...
30 CFR 57.12067 - Installation of transformers.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Installation of transformers. 57.12067 Section... Electricity Surface Only § 57.12067 Installation of transformers. Transformers shall be totally enclosed, or shall be placed at least 8 feet above the ground, or installed in a transformer house, or surrounded by...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adkins, Brian; Castilone, Lisa
The objective of the project was to provide affordable renewable energy to 22 low income reservation homeowners; provide job training to tribal members and reduce air pollution by equivalent carbon offsets. The project exceeded grant objectives installing 66kW of rooftop solar on 22 low income single family homes and providing hands-on PV rooftop solar installation training to 24 tribal individuals (four more than planned). The project was a phased installment of an on-going partnership between the Tribe and GRID that was initiated in 2013 whereby 62 rooftop solar units were installed prior to this funded effort. The reported work inmore » this report describes the funded effort where US Department of Energy provided partial funding through grant award IE0006949 and marks the first phase of an effort matching California Solar SASH Initiative funding with DOE Office of Indian Energy Funding and brings the total for the program to 84 installed systems (running total of 271 Kw installed) and the end of the project. Tribal workforce development was a key aspect of the project and trained 24tribal members for a total 1168 cumulative on-job training hours. The solar installations and training efforts were fully completed by September of 2016 with 66.6 kW installed - 8 kW more than the original estimate stated in the grant application.« less
2016 Wind Technologies Market Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiser, Ryan H.; Bolinger, Mark
The U.S. Department of Energy (DOE)’s Wind Technologies Market Report provides an annual overview of trends in the U.S. wind power market. You can find the report, a presentation, and a data file on the Files tab, below. Additionally, several data visualizations are available in the Data Visualizations tab. Highlights of this year’s report include: -Wind power additions continued at a rapid clip in 2016: $13 billion was invested in new wind power plants in 2016. In 2016, wind energy contributed 5.6% of the nation’s electricity supply, more than 10% of total electricity generation in fourteen states, and 29% tomore » 37% in three of those states—Iowa, South Dakota, and Kansas. -Bigger turbines are enhancing wind project performance: Increased blade lengths, in particular, have dramatically increased wind project capacity factors, one measure of project performance. For example, the average 2016 capacity factor among projects built in 2014 and 2015 was 42.6%, compared to an average of 32.1% among projects built from 2004 to 2011 and 25.4% among projects built from 1998 to 2001. -Low wind turbine pricing continues to push down installed project costs: Wind turbine prices have fallen from their highs in 2008, to $800–$1,100/kW. Overall, the average installed cost of wind projects in 2016 was $1,590/kW, down $780/kW from the peak in 2009 and 2010. -Wind energy prices remain low: After topping out at nearly 7¢/kWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped to around 2¢/kWh—though this nationwide average is dominated by projects that hail from the lowest-priced Interior region of the country (such as Texas, Iowa, Oklahoma). These prices, which are possible in part due to federal tax support, compare favorably to the projected future fuel costs of gas-fired generation. -The supply chain continued to adjust to swings in domestic demand for wind equipment: Wind sector employment reached a new high of more than 101,000 full-time workers at the end of 2016. For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>90%), towers (65-80%), and blades and hubs (50-70%), but is much lower (<20%) for most components internal to the turbine. -Continued strong growth in wind capacity is anticipated in the near term: With federal tax incentives still available, though declining, various forecasts for the domestic market show expected wind power capacity additions averaging more than 9,000 MW/year from 2017 to 2020.« less
Solar heating and hot water system installed at Cherry Hill, New Jersey
NASA Technical Reports Server (NTRS)
1979-01-01
The solar heating and hot water system installed in existing buildings at the Cherry Hill Inn in Cherry Hill, New Jersey is described in detail. The system is expected to furnish 31.5% of the overall heating load and 29.8% of the hot water load. The collectors are liquid evacuated tube type. The storage system is an above ground insulated steel water tank with a capacity of 7,500 gallons.
Research on wind power grid-connected operation and dispatching strategies of Liaoning power grid
NASA Astrophysics Data System (ADS)
Han, Qiu; Qu, Zhi; Zhou, Zhi; He, Xiaoyang; Li, Tie; Jin, Xiaoming; Li, Jinze; Ling, Zhaowei
2018-02-01
As a kind of clean energy, wind power has gained rapid development in recent years. Liaoning Province has abundant wind resources and the total installed capacity of wind power is in the forefront. With the large-scale wind power grid-connected operation, the contradiction between wind power utilization and peak load regulation of power grid has been more prominent. To this point, starting with the power structure and power grid installation situation of Liaoning power grid, the distribution and the space-time output characteristics of wind farm, the prediction accuracy, the curtailment and the off-grid situation of wind power are analyzed. Based on the deep analysis of the seasonal characteristics of power network load, the composition and distribution of main load are presented. Aiming at the problem between the acceptance of wind power and power grid adjustment, the scheduling strategies are given, including unit maintenance scheduling, spinning reserve, energy storage equipment settings by the analysis of the operation characteristics and the response time of thermal power units and hydroelectric units, which can meet the demand of wind power acceptance and provide a solution to improve the level of power grid dispatching.
Water hyacinths for upgrading sewage lagoons to meet advanced wastewater treatment standards, part 2
NASA Technical Reports Server (NTRS)
Wolverton, B. C.; Mcdonald, R. C.
1976-01-01
Field tests using water hyacinths as biological filtration agents were conducted in the Mississippi gulf coast region. The plants were installed in one single cell and one multiple cell sewage lagoon systems. Water hyacinths demonstrated the ability to maintain BOD5 and total suspended solid (TSS) levels within the Environmental Protection Agency's prescribed limits of 30 mg/lBOD5 and 30 mg/l TSS. A multiple cell sewage lagoon system consisting of two aerated and one water hyacinth covered cell connected in series demonstrated the ability to maintain BOD5 and TSS levels below 30 mg/l year-round. A water hyacinth covered lagoon with a surface area of 0.28 hectare containing a total volume of 6.8 million liters demonstrated the capacity to treat 437,000 to 1,893,000 liters of sewage influent from 2.65 hectares of aerated lagoons daily and produce an effluent that met or exceeded standards year-round.
Snapshot of photovoltaics - February 2018
NASA Astrophysics Data System (ADS)
Jäger-Waldau, Arnulf
2018-05-01
Solar photovoltaic electricity generation is the fastest growing power generation source world-wide. The significant cost reduction of solar PV over the last decade, and the zero fuel cost volatility have increased the attractiveness. In 2017, the newly installed solar PV power of over 90 GW was more than all the world-wide cumulative installed PV capacity until the mid of 2012. China was again the main driver behind this strong growth with more than 50 GW of annual installations in 2017. Apart from the electricity sector, renewable energy sources for the generation of heat and environmental friendly synthetic-fuels for the transport sector will become more and more important in the future.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ullal, H. S.; von Roedern, B.
2007-09-01
We report here on the major commercialization aspects of thin-film photovoltaic (PV) technologies based on CIGS and CdTe (a-Si and thin-Si are also reported for completeness on the status of thin-film PV). Worldwide silicon (Si) based PV technologies continues to dominate at more than 94% of the market share, with the share of thin-film PV at less than 6%. However, the market share for thin-film PV in the United States continues to grow rapidly over the past several years and in CY 2006, they had a substantial contribution of about 44%, compared to less than 10% in CY 2003. Inmore » CY 2007, thin-film PV market share is expected to surpass that of Si technology in the United States. Worldwide estimated projections for CY 2010 are that thin-film PV production capacity will be more than 3700 MW. A 40-MW thin-film CdTe solar field is currently being installed in Saxony, Germany, and will be completed in early CY 2009. The total project cost is Euro 130 million, which equates to an installed PV system price of Euro 3.25/-watt averaged over the entire solar project. This is the lowest price for any installed PV system in the world today. Critical research, development, and technology issues for thin-film CIGS and CdTe are also elucidated in this paper.« less
Ramakrishna Mission initiative impact study: final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chaurey, A.
2000-07-06
This report has been prepared by the Tata Energy Research Institute (TERI) for the National Renewable Energy Laboratory. It presents the results of the evaluation and impact assessment of solar photovoltaic lighting systems in the region of Sunderbans, West Bengal, that were deployed by a reputable non-governmental organization (Ramakrishna Mission) under the auspices of the INDO-US collaborative project. The objectives of the study were to evaluate the solar photovoltaic systems for their impact on the individual households as well as on the community, to assess the effectiveness of the implementation and financial mechanisms, and to draw a long-term strategy formore » NREL's activities in Sunderbans based on case studies of similar interventions. Under the project, provision was made to supply 300 domestic lighting systems (DLS) based on 53-Wp module capacity to individual households and a few other systems such as for lighting, medical refrigeration, and pumping water to community centers. For this study, 152 households were surveyed, of which 29 had also been a part of earlier pre- and post-installation surveys, 47 had been a part of the earlier post-installation survey, and 76 were households that were surveyed for the first time. A set of 46, out of the total 152 households, was selected for evaluating the systems for their technical performance with respect to module output, condition of the battery, and daily energy consumption. Of the total 300 modules, 2 had been stolen, 9 out of the total 300 batteries needed to be replaced, and 10 out of the 300 charge controllers were non-functional. The statistics for the surveyed households indicate 32 luminaire-related faults (blackening or flickering of compact fluorescent lights) and 11 other faults related to fuses, switches, etc.« less
Distribution Strategies for Solar and Wind Renewables in NW Europe
NASA Astrophysics Data System (ADS)
Smedley, Andrew; Webb, Ann
2017-04-01
Whilst the UNFCCC Paris Agreement Climate change was ratified in November, 2016 saw the highest global temperature anomaly on record at 1.2°C above pre-industrial levels. As such there is urgent need to reduce CO2 emissions by a move away from fossil fuels and towards renewable electricity energy technologies. As the principal renewable technologies of solar PV and wind turbines contribute an increasing fraction to the electricity grid, questions of cumulative intermittency and the large-scale geographic distribution of each technology need to be addressed. In this study our initial emphasis is on a calculation of a relatively high spatial resolution (0.1° × 0.1°) daily gridded dataset of solar irradiance data, over a 10 year period (2006-2015). This is achieved by coupling established sources of satellite data (MODIS SSF level2 instantaneous footprint data) to a well-validated radiative transfer model, here LibRadTran. We utilise both a morning and afternoon field for two cloud layers (optical depth and cloud fraction) interpolated to hourly grids, together with aerosol optical depth, topographic height and solar zenith angle. These input parameters are passed to a 5-D LUT of LibRadTran results to construct hourly estimates of the solar irradiance field, which is then integrated to a daily total. For the daily wind resource we rely on the 6 hourly height-adjusted ECMWF ERA-Interim reanalysis wind fields, but separated into onshore, offshore and deep water components. From these datasets of the solar and wind resources we construct 22 different distribution strategies for solar PV and wind turbines based on the long-term availability of each resource. Combining these distributions with the original daily gridded datasets enables each distribution strategy to be then assessed in terms of the day-to-day variability, the installed capacity required to maintain a baseline supply, and the relative proportions of each technology. Notably for the NW European area considered we find that distribution strategies that only deploy renewables in regions with the highest annual mean irradiance or wind resource, also minimise the total required installed capacity and typically exhibit the smallest output range. Further in the majority of strategies we find that the onshore and offshore wind resource fractions fall to zero with the wind contribution being fully composed of deep water installations. Only as the strategy is to increasingly concentrate each technology in areas with the highest annual mean resource do firstly offshore, and then onshore wind, contribute.
2011-02-01
almost entirely dependent on the national transmission grid . . . [which] is fragile, vulnerable, near its capacity limit, and outside of DOD control...has returned. A major factor in this resurgence has come from developing countries, where expressed and pro- jected demands for electricity are...rapidly growing and limited infrastructural and investment capacity generates interest in reactors that can be deployed rapidly and in- crementally.14
Practice of Meteorological Services in Turpan Solar Eco-City in China (Invited)
NASA Astrophysics Data System (ADS)
Shen, Y.; Chang, R.; He, X.; Jiang, Y.; Zhao, D.; Ma, J.
2013-12-01
Turpan Solar Eco-City is located in Gobi in Northwest China, which is one of the National New Energy Demonstration Urban. The city was planed and designed from October of 2008 and constructed from May of 2010, and the first phase of the project has been completed by October of 2013. Energy supply in Turpan Solar Eco-City is mainly from PV power, which is installed in all of the roof and the total capacity is 13.4MW. During the planning and designing of the city, and the running of the smart grid, meteorological services have played an important role. 1) Solar Energy Resource Assessment during Planning Phase. According to the observed data from meteorological stations in recent 30 years, solar energy resource was assessed and available PV power generation capacity was calculated. The results showed that PV power generation capacity is 1.3 times the power consumption, that is, solar energy resource in Turpan is rich. 2) Key Meteorological Parameters Determination for Architectural Design. A professional solar energy resource station was constructed and the observational items included Global Horizontal Irradiance, Inclined Total Solar Irradiance at 30 degree, Inclined Total Solar Irradiance at local latitude, and so on. According these measured data, the optical inclined angle for PV array was determined, that is, 30 degree. The results indicated that the annual irradiation on inclined plane with optimal angle is 1.4% higher than the inclined surface with latitude angle, and 23.16% higher than the horizontal plane. The diffuse ratio and annual variation of the solar elevation angle are two major factors that influence the irradiation on inclined plane. 3) Solar Energy Resource Forecast for Smart Grid. Weather Research Forecast (WRF) model was used to forecast the hourly solar radiation of future 72 hours and the measured irradiance data was used to forecast the minutely solar radiation of future 4 hours. The forecast results were submitted to smart grid and used to regulate the local grid and the city gird.
Waste incineration, Part I: Technology.
1990-02-01
Based upon an overview of the technology of incineration and the nature of hospital waste, HHMM offers the following suggestions: Old retort or other excess air incinerators should be replaced regardless of age. Even if emissions control equipment and monitoring devices can be retrofitted, excess-air incinerators are no longer cost-effective in terms of capacity, fuel consumption, and heat recovery. Audit (or have a specialist audit) your waste stream thoroughly. Consult a qualified engineering company experienced in hospital installations to get a system specified as exactly as possible to your individual conditions and needs. Make sure that the capacity of your incinerator will meet projections for future use. Anticipate the cost of emissions control and monitoring devices whether your state currently requires them or not. Make sure that your incinerator installation is engineered to accept required equipment in the future. Develop a strong community relations program well in advance of committing to incinerator installation. Take a proactive position by inviting your neighbors in during the planning stages. Be sure the contract governing incinerator purchase and installation has a cancellation clause, preferably without penalties, in case community action or a change in state regulations makes installation and operation impractical. The technology is available to enable hospitals to burn waste effectively, efficiently, and safely. HHMM echoes the concerns of Frank Cross--that healthcare facilities, as well as regional incinerators and municipalities, show the same concern for environmental protection as for their bottom lines. When emissions are under control and heat is recovered, both the environment and the bottom line are healthier.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Geet, Otto D.; Fu, Ran; Horowitz, Kelsey A.
NREL studied a new type of photovoltaic (PV) module configuration wherein multiple narrow, tilted slats are mounted in a single frame. Each slat of the PV slat module contains a single row of cells and is made using ordinary crystalline silicon PV module materials and processes, including a glass front sheet and weatherproof polymer encapsulation. Compared to a conventional ballasted system, a system using slat modules offer higher energy production and lower weight at lower LCOE. The key benefits of slat modules are reduced wind loading, improved capacity factor and reduced installation cost. First, the individual slats allow air tomore » flow through, which reduce wind loading. Using PV performance modeling software, we compared the performance of an optimized installation of slats modules to a typical installation of conventional modules in a ballasted rack mounting system. Based on the results of the performance modeling two different row tilt and spacing were tested in a wind tunnel. Scaled models of the PV Slat modules were wind tunnel tested to quantify the wind loading of a slat module system on a commercial rooftop, comparing the results to conventional ballasted rack mounted PV modules. Some commercial roofs do not have sufficient reserve dead load capacity to accommodate a ballasted system. A reduced ballast system design could make PV system installation on these roofs feasible for the first time without accepting the disadvantages of penetrating mounts. Finally, technoeconomic analysis was conducted to enable an economic comparison between a conventional commercial rooftop system and a reduced-ballast slat module installation.« less
Electric power quarterly: January-March 1988. [Contains glossary
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-07-22
The Electric Power Quarterly (EPQ) presents information on electric utilities at the plant level. The information provides the following: cost, quantity, and quality of fossil fuel receipts; net generation; fuel consumption; and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. These data are published to provide meaningful, timely, objective, and accurate energy information for a wide audience including Congress, federal, and state agencies; industry; and the general public. In this report, data regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and qualitymore » of fossil-fuel receipts are presented on a plant-by-plant basis for plants with a combined installed nameplate capacity of 50 megawatts or larger.« less
[Breast cancer screening process indicators in Mexico: a case study].
Uscanga-Sánchez, Santos; Torres-Mejía, Gabriela; Ángeles-Llerenas, Angélica; Domínguez-Malpica, Raúl; Lazcano-Ponce, Eduardo
2014-01-01
To identify, measure and compare the performance indicators of productivity, effective access and quality service for the early detection breast cancer program in Mexico. By means of a study case based on the 2011 Women Cancer Information System (SICAM), the indicators were measured and compared with the Mexican official standard NOM-041-SSA2-2011 and international standards. The analysis showed insufficient installed capacity (37%), low coverage in screening (15%), diagnostic evaluation (16%), biopsy (44%) and treatment (57%), and very low effectiveness in confirmed cases by the total number of screening mammograms performed (0.04%). There was no information available, from SICAM, to estimate the rest of the indicators proposed. Efficient health information systems are required in order to monitor indicators and generate performance observatories of screening programs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-03-01
The petroleum sector in Ecuador brings in about 65 percent of the country's revenue. Three of the refineries are located in the coastal region. The other two, plus the Liquified Petroleum Gas Plant (LPG), are located in the Oriente region (Amazon jungle). The refineries operate at about 85% of their installation capacity. The Petroindustrial and Petropeninsula investment plan for 1991 comtemplates the expansion of the Esmeraldas refinery to 110,000 barrels a day, and the up-grading of the Shushufindi and Libertad refineries located near the city of Guayaquil. The United States is by far the largest supplier of refinery equipment, partsmore » and accessories, controlling about 90% of the total market.« less
Federal Aviation Administration Aviation System Capital Investment Plan 1993
1993-12-01
Facilitates full use of terminal airspace capacity. 0 Increases safety and efficiency. 62-21 Airport Surface Traffic 0 Optimizes sequencing and...installation of tower control computer complexes (TCCCs) in se- 0 AAS software for terminal and en route ATC lected airport traffic control towers. TCCCs...project provides economical ASR-4/5/6, and install 40 ASR-9s at radar service at airports with air traffic densi- ASR-4/5/6 sites). ties high enough to
Management of Brackish Groundwater Extraction, San Diego-Tijuana area, USA and Mexico
NASA Astrophysics Data System (ADS)
Danskin, W. R.
2017-12-01
Management of brackish groundwater extraction from coastal sediment in the transboundary San Diego-Tijuana area, USA and Mexico, involves monitoring storage depletion, seawater intrusion, and land subsidence. In 2017, five additional extraction wells were installed, doubling capacity of the Reynolds Groundwater Desalination Facility. Environmental permits to expand capacity of the facility, and the recently-enacted Sustainable Groundwater Management Act (SGMA) by the State of California require monitoring the possible adverse effects of the additional extraction. Fortuitously, over the past 14 years, 12 deep multiple-depth, monitoring-well sites were installed by the United States Geological Survey (USGS) to aid in mapping the coastal geology and groundwater conditions. Now these sites are being used for groundwater management. Storage depletion is monitored daily via water levels measured using transducers installed permanently in each of the 4-6 piezometers at each site and transmitted automatically to the Internet. Seawater intrusion is tracked annually via electromagnetic geophysical logging in the deepest piezometer at each site, 500-800 meters below land surface, about twice the depth of the extraction wells. Land subsidence is determined annually from surveys of reference points installed at the well sites and from Interferometric Synthetic Aperature Radar (InSAR) satellite data. Management also involves use of a regional hydrologic model to simulate the likely location and timing of future storage depletion, seawater intrusion, and land subsidence.
Aerodynamic and propeller performance characteristics of a propfan-powered, semispan model
NASA Technical Reports Server (NTRS)
Levin, Alan D.; Smith, Ronald C.; Wood, Richard D.
1985-01-01
A semispan wing/body model with a powered propeller was tested to provide data on a total powerplant installation drag penalty of advanced propfan-powered aircraft. The test objectives were to determine the total power plant installation drag penalty on a representative propfan aircraft; to study the effect of configuration modifications on the installed powerplant drag; and to determine performance characteristics of an advanced design propeller which was mounted on a representative nacelle in the presence of a wing.
Design review and analysis for a Pratt and Whitney fluid-film bearing and seal testing rig
NASA Technical Reports Server (NTRS)
Childs, Dara W.
1994-01-01
A design review has been completed for a Pratt and Whitney (P&W)-designed fluid-film bearing and annular-seal test rig to be manufactured and installed at George C. Marshall Space Flight Center (MSFC). Issues covered in this study include: (1) the capacity requirements of the drive unit; (2) the capacity and configuration of the static loading system; (3) the capacity and configuration of the dynamic excitation system; (4) the capacity, configuration, and rotordynamic stability of a test bearing, support bearings, and shaft; and (5) the characteristics and configuration of the measurement transducers and data channels.
2014-01-01
kW) and Energy (kWh) Charges, Including Time-of-Use Energy Charges X X X X X Power Factor Improvement X X Emergency Demand Response... Capacity Market) X X X X X Other Capacity Sales X X X Frequency Regulation X X X X Spinning/Synchronous Reserve X X Blackstart Capacity X X X...Policy, Organizational, and Other Factors that can Accelerate Prudent Electricity Security Asset Investments and Uses 0% 2% 4% 6% 8% 10% 12% 14% 16
Code of Federal Regulations, 2010 CFR
2010-01-01
... phases: (a) Measurement of the insulating capacity, that is, the K-coefficient, of the insulated body. (b) Determination of the efficiency of the thermal appliance as installed in the insulated body. In the case of...
Rates for backup service under PURPA when the supplying utility has excess generating capacity
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Under PURPA, cogenerators are entitled to receive backup service. It is often said that tariffs for backup service should reflect the low probability that an unscheduled outage will occur during system peak. This memorandum concludes that probabilistic analysis of contribution to coincident peak demand is not relevant under PURPA during periods in which a utility system is experiencing generating capacity surpluses, and that in such situations, backup rates should be designed so that should the customer insist on installing a cogeneration system, that the customer's contribution to fixed costs remains constant. The reason for this is to assure that prospectivemore » cogenerators receive appropriate pricing signals in their assessment of proposed cogeneration projects, and should they decide to install cogeneration facilities requiring backup service, to hold the remaining customers on the system harmless.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Quenelle, A.; Metz, R.; Poirier, D.
1994-12-31
Due to the extended work by TOTAL, since 1971, offshore and within the Mahakam delta (East Kalimantan), several installation and platform concepts have been used. The present paper only concerns the installations at Handil and Tambora sites located in the Mahakam delta (in-shore) where water depths are between 2 and 4 meters, water current is 2 knots max. and tide is 2 meters as an average. The experience gained by the company in this kind of job made it possible to recently install in a single piece large and heavy integrated decks (up to 2,600 t) with the optimum usemore » of local skills, non-sophisticated technology and at low costs. The following shows the historical and evolutive experience of TOTAL up to now in platform concepts in this area of the world and gives, by the way, some useful information for future work.« less
Comparison of Predicted and Measured Towline Tensions
1994-05-01
10 volts DC Calibration Error Less than 0.25% of full capacity Material Stainless Steel The installed configuration of the load cell at the tow end is...capacity zero shift per IF over operating temperature range. Construction- Stainless steel , seal welded. Electrical Connector- Brantner MSJ-4-BCR...Manufacturer- Marsh & MarineTm Connectors 150 Manufacturer’s Part #- RM-4-MP Description- Molded in-line female connector with stainless steel
2016 End of the year South Carolina PV soft cost and workforce development
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox, Elise B.; Edwards, Thomas B.; Drory, Michael D.
2017-08-16
A solar industry survey was given to professional installers who serve the South Carolina market in order to determine trends in costing, work force needs, and business demographics at the end of 2016. It was found that 70% of the respondents serve the residential sector, while only 7% of the total exclusively serves the residential market. The average size of residential installations remain near 9 kW-DC, while the average size of commercial and utility scale installations continue to grow to 378 kW-DC and 14.8 MW-DC, respectively. The total cost of these residential systems has hovered around $3.50/W-DC since the endmore » of 2015, while commercial installations have dropped to $2.45/W-DC and utility scale installations have dropped to $1.49/W-DC. It is expected that the cost of utility scale installations will continue to drop as there are publically reported utility scale installations with contracted PPAs for less than 4¢/kWh. 52-60% of the cost is associated with hardware only depending upon sector.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conklin, Shane
2013-09-30
Shell space fit out included faculty office advising space, student study space, staff restroom and lobby cafe. Electrical, HVAC and fire alarm installations and upgrades to existing systems were required to support the newly configured spaces. These installations and upgrades included audio/visual equipment, additional electrical outlets and connections to emergency generators. The project provided increased chilled water capacity with the addition of an electric centrifugal chiller. Upgrades associated with chiller included upgrade of exhaust ventilation fan, electrical conductor and breaker upgrades, piping and upgrades to air handling equipment.
Solar heating and hot water system installed at Cherry Hill, New Jersey. [Hotels
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1979-05-16
The solar heating and hot water system installed in existing buildings at the Cherry Hill Inn in Cherry Hill, New Jersey is described in detail. The system went into operation November 8, 1978 and is expected to furnish 31.5% of the overall heating load and 29.8% of the hot water load. The collectors are General Electric Company liquid evacuated tube type. The storage system is an above ground insulated steel water tank with a capacity of 7,500 gallons.
2002-08-01
of these elevation files depends on the contour interval and map scale of the original contour data. The choice of data source for determining the...the ATTACC LCM Installation CD. Not all versions of the ATTACC LCM Installation CD have the LS Factor Calculator software included. The process for ...PAGE Form Approved OMB No. 0704-0188 Public reporting burder for this collection of information is estibated to average 1 hour per response
Retrospective and prospective analysis of policy incentives for wind power in Portugal
NASA Astrophysics Data System (ADS)
Pena Cabra, Ivonne A.
Concerns over climate change impacts, goals to increase environmental sustainability, and questions about the reliability of fuel supply have led several countries to pursue the goal of increasing the share of renewable energy sources in their electricity grid. Portugal is one of the leading countries for wind electricity generation. Wind diffusion in Portugal started in the early 2000's and in 2013 wind electricity generation accounted for more than 24% (REN 2013b). The large share of wind in Portuguese electricity production is a consequence of European Union (E.U.) mandates and national policies, mainly feed-in tariffs. Discussions on the appropriate policy design and level of incentive to promote renewable energy adoption and meet further renewable capacity goals are ongoing in Portugal, namely in what concerns the level and duration of feed-in tariffs that should be provided to independent power producers. This, in turn, raises the question of whether the past feed-in tariff levels were well designed to achieve the goals of a larger penetration of renewables in the Portuguese grid. The policies to induce wind adoption have led to a growth in wind installed capacity and share of electricity generated by wind in Portugal from less than 1% in 2000 to approximately 24% in 2013, but questions arise on their cost-effectiveness and whether alternative policy designs would have led to the same goal. The Portuguese wind feed-in tariffs are a guaranteed incentive which has varied between 85- 180/MWh over the last 20 years (ERSE 2011), and remained approximately constant since 2001 at $101/MWh. They are currently guaranteed for 20 years of production or 44GWh of electricity generation per MW installed (Diario da Republica 2013) - the longest period among countries with high wind electricity share. They do not incorporate any digression rate besides inflation, and are guaranteed for every unit of electricity fed to the grid. There are no power plants that have already been decommissioned despite being in operation for more than 20 years, favoring from new, detailed and hard-to-follow agreements in the legislation. All wind parks that are currently in operation have received feed-in tariffs since they connected to the grid, and are expected to keep receiving them at least until December 2019, and up to December 2036 - depending on year of connection and agreement under the most recent legislation (Diario da Republica 2013). The 2020 renewable energy goals in Portugal include having 6.8 GW of installed wind capacity, which implies the connection of 2 GW in the next years. If no further grid investments are made and wind capacity increases up to 100 MW to the connection point that we analyze, total annual electricity spill is likely to range the 20% to 40%. If the connection grid policy is designed to allow for wind spill, already 'occupied' connection points will be available to new entrants, lowering the total investment costs for new wind parks and increasing their profitability. This thesis is divided in three main parts: a first introductory section, a retrospective study of wind power in Portugal and a prospective analysis of the Portuguese wind power sector. The introductory section is a brief overview of the global renewable status, described in Chapter 1. Chapter 2 and Chapter 3 compile a retrospective study of wind power and the policies that have incentivized wind diffusion. We include in the discussion some references to the future wind power goals, but the results and policy recommendations are directed towards the existing connected wind power capacity. (Abstract shortened by UMI.).
Characteristics of NOx emission from Chinese coal-fired power plants equipped with new technologies
NASA Astrophysics Data System (ADS)
Ma, Zizhen; Deng, Jianguo; Li, Zhen; Li, Qing; Zhao, Ping; Wang, Liguo; Sun, Yezhu; Zheng, Hongxian; Pan, Li; Zhao, Shun; Jiang, Jingkun; Wang, Shuxiao; Duan, Lei
2016-04-01
Coal combustion in coal-fired power plants is one of the important anthropogenic NOx sources, especially in China. Many policies and methods aiming at reducing pollutants, such as increasing installed capacity and installing air pollution control devices (APCDs), especially selective catalytic reduction (SCR) units, could alter NOx emission characteristics (NOx concentration, NO2/NOx ratio, and NOx emission factor). This study reported the NOx characteristics of eight new coal-fired power-generating units with different boiler patterns, installed capacities, operating loads, and coal types. The results showed that larger units produced less NOx, and anthracite combustion generated more NOx than bitumite and lignite combustion. During formation, the NOx emission factors varied from 1.81 to 6.14 g/kg, much lower than those of older units at similar scales. This implies that NOx emissions of current and future units could be overestimated if they are based on outdated emission factors. In addition, APCDs, especially SCR, greatly decreased NOx emissions, but increased NO2/NOx ratios. Regardless, the NO2/NOx ratios were lower than 5%, in accordance with the guidelines and supporting the current method for calculating NOx emissions from coal-fired power plants that ignore NO2.
Structural Considerations of a 20MW Multi-Rotor Wind Energy System
NASA Astrophysics Data System (ADS)
Jamieson, P.; Branney, M.
2014-12-01
The drive to upscale offshore wind turbines relates especially to possiblereductions in O&M and electrical interconnection costs per MW of installed capacity.Even with best current technologies, designs with rated capacity above about 3 MW are less cost effective exfactory per rated MW(turbine system costs) than smaller machines.Very large offshore wind turbines are thereforejustifiedprimarily by overall offshore project economics. Furthermore, continuing progress in materials and structures has been essential to avoid severe penalties in the power/mass ratio of large multi-MW machines.The multi-rotor concept employs many small rotors to maximise energy capture area withminimum systemvolume. Previous work has indicated that this can enablea very large reduction in the total weight and cost of rotors and drive trains compared to an equivalent large single rotor system.Thus the multi rotor concept may enable rated capacities of 20 MW or more at a single maintenancesite. Establishing the cost benefit of a multi rotor system requires examination of solutions for the support structure and yawing, ensuring aerodynamic losses from rotor interaction are not significant and that overall logistics, with much increased part count (more reliable components) and less consequence of single failuresare favourable. This paper addresses the viability of a support structure in respect of structural concept and likely weight as one necessary step in exploring the potential of the multi rotor concept.
Penstock leakage at the Robert Moses Niagara Power Plant - Investigation, design, and construction
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dumont, M.F.; Baker, C.H.; Broderick, W.
1995-12-31
This paper describes an investigation of observed penstock leakage and related gallery flooding at the Robert Moses Niagara Power Plant, in Lewiston, New York; engineering design of alternative remediation measures; test grouting of a dewatered penstock in 1991; and the subsequent grouting of the remaining twelve penstocks. The Robert Moses Niagara Power Plant is the lower part of the Niagara Pumped Storage Project, which is owned and operated by the New York Power Authority. Water diverted some 4 miles (6.4 km) upstream of the plant is passed through 13 individual penstocks 28 ft (8.5 m) in diameter to a powermore » plant on the right bank of the Niagara River. The net head at the plant is 300 ft (91.4 m), and the hydraulic capacity is about 91,000 cfs (2,575 m{sup 3}/s). The total installed capacity is about 2,000 MW. Since completion of construction in 1962 there had been recurring problems with flooding of the floors at the upper intake galleries. This was particularly noticeable during periods of heavy rainfall when the existing storm drains were close to their design capacity. The paper presents details of the investigations, including penstock inspection, methods of flow measurement and analysis, design criteria for the grout selected, details of the drilling and grout placement, and the anticipated long-term performance of the grout in service.« less
MUNI Ways and Structures Building Integrated Solar Membrane Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, Randall
The initial goal of the MUNI Ways and Structures Building Integrated Solar Membrane Installation Project was for the City and County of San Francisco (CCSF) to gain experience using the integrated higher efficiency solar photovoltaic (PV) single-ply membrane product, as it differs from the conventional, low efficiency, thin-film PV products, to determine the feasibility of success of larger deployment. As several of CCSF’s municipal rooftops are constrained with respect to weight restrictions, staff of the Energy Generation Group of the San Francisco Public Utilities Commission (SFPUC) proposed to install a solar PV system using single-ply membrane The installation of themore » 100 kW (DC-STC) lightweight photo voltaic (PV) system at the MUNI Ways and Structures Center (700 Pennsylvania Ave., San Francisco) is a continuation of the commitment of the City and County of San Francisco (CCSF) to increase the pace of municipal solar development, and serve its municipal facilities with clean renewable energy. The fourteen (14) solar photovoltaic systems that have already been installed at CCSF municipal facilities are assisting in the reduction of fossil-fuel use, and reduction of greenhouse gases from fossil combustion. The MUNI Ways & Structures Center roof has a relatively low weight-bearing capacity (3.25 pounds per square foot) and use of traditional crystalline panels was therefore rejected. Consequently it was decided to use the best available highest efficiency Building-Integrated PV (BIPV) technology, with consideration for reliability and experience of the manufacturer which can meet the low weight-bearing capacity criteria. The original goal of the project was to provide an opportunity to monitor the results of the BIPV technology and compare these results to other City and County of San Francisco installed PV systems. The MUNI Ways and Structures Center was acquired from the Cookson Doors Company, which had run the Center for many decades. The building was renovated in 1998, but the existing roof had not been designed to carry a large load. Due to this fact, a complete roofing and structural analysis had to be performed to match the available roof loading to the existing and/or new solar PV technology, and BIPV was considered an excellent solution for this structure with the roof weight limitations. The solar BIPV system on the large roof area was estimated to provide about 25% of the total facility load with an average of 52,560 kWh per month. In order to accomplish the goals of the project, the following steps were performed: 1. SFPUC and consultants evaluated the structural capability of the facility roof, with recommendations for improvements necessary to accommodate the solar PV system and determine the suitable size of the system in kilowatts. The electrical room and switchgear were evaluated for any improvements necessary and to identify any constraints that might impede the installation of necessary inverters, transformers or meters. 2. Development of a design-build Request for Proposal (RFP) to identify the specifications for the solar PV system, and to include SFPUC technical specifications, equipment warranties and performance warranties. Due to potential labor issues in the local solar industry, SFPUC adjusted the terms of the RFP to more clearly define scope of work between electricians, roofers and laborers. 3. Design phase of project included electrical design drawings, calculations and other construction documents to support three submittals: 50% (preliminary design), 90% (detailed design) and 100% (Department of Building Inspection permit approved). 4. Installation of solar photovoltaic panels, completion of conduit and wiring work, connection of inverters, isolation switches, meters and Data Acquisition System by Contractor (Department of Public Works). 5. Commissioning of system, including all necessary tests to make the PV system fully functional and operational at its rated capacity of 100 kW (DC-STC). Following completion of these steps, the solar PV system was installed and fully integrated by late October 2013. The interconnection with PG&E utility grid was completed and the system began generating power on November 21, 2013. The projected annual energy generation for the system is estimated at 127,120 kWh/year.« less
U.S. Solar Photovoltaic System Cost Benchmark: Q1 2017
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fu, Ran; Feldman, David; Margolis, Robert
This report benchmarks U.S. solar photovoltaic (PV) system installed costs as of the first quarter of 2017 (Q1 2017). We use a bottom-up methodology, accounting for all system and projectdevelopment costs incurred during the installation to model the costs for residential, commercial, and utility-scale systems. In general, we attempt to model the typical installation techniques and business operations from an installed-cost perspective. Costs are represented from the perspective of the developer/installer; thus, all hardware costs represent the price at which components are purchased by the developer/installer, not accounting for preexisting supply agreements or other contracts. Importantly, the benchmark also representsmore » the sales price paid to the installer; therefore, it includes profit in the cost of the hardware, 1 along with the profit the installer/developer receives, as a separate cost category. However, it does not include any additional net profit, such as a developer fee or price gross-up, which is common in the marketplace. We adopt this approach owing to the wide variation in developer profits in all three sectors, where project pricing is highly dependent on region and project specifics such as local retail electricity rate structures, local rebate and incentive structures, competitive environment, and overall project or deal structures. Finally, our benchmarks are national averages weighted by state installed capacities.« less
2014-08-01
installing high-capacity, post-tensioned foundation anchors. These stressed steel tendons have been used to strengthen hydraulic concrete structures and to...Field Inspection in Mass Concrete .................................... 32 3.3 NDT Technologies in General for Seven Strand Wire Cable Inspection...rod end of a 1.31-inch-diameter grease embedded trunion anchor rod with concrete termination. ..................... 37 Figure 32. 441 Khz narrow
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-03
... proposed powerhouse containing one proposed generating unit with an installed capacity of 23 kilowatts; and..., 2011, the Colorado Division of Wildlife concurred with the request contingent upon the applicant...
Redesigned Electron-Beam Furnace Boosts Productivity
NASA Technical Reports Server (NTRS)
Williams, Gary A.
1995-01-01
Redesigned electron-beam furnace features carousel of greater capacity so more experiments conducted per loading, and time spent on reloading and vacuum pump-down reduced. Common mounting plate for electron source and carousel simplifies installation and reduces vibration.
ERIC Educational Resources Information Center
Currents, 2000
2000-01-01
A chart of 40 alumni-development database systems provides information on vendor/Web site, address, contact/phone, software name, price range, minimum suggested workstation/suggested server, standard reports/reporting tools, minimum/maximum record capacity, and number of installed sites/client type. (DB)
30 CFR 75.1107-6 - Capacity of fire suppression devices; location and direction of nozzles.
Code of Federal Regulations, 2013 CFR
2013-07-01
... withstand rough usage and vibration when installed on mining equipment. (b) The extinguishant-discharge..., or combination type. Where fire control is achieved by internal injection, or combination of internal...
30 CFR 75.1107-6 - Capacity of fire suppression devices; location and direction of nozzles.
Code of Federal Regulations, 2012 CFR
2012-07-01
... withstand rough usage and vibration when installed on mining equipment. (b) The extinguishant-discharge..., or combination type. Where fire control is achieved by internal injection, or combination of internal...
30 CFR 75.1107-6 - Capacity of fire suppression devices; location and direction of nozzles.
Code of Federal Regulations, 2011 CFR
2011-07-01
... withstand rough usage and vibration when installed on mining equipment. (b) The extinguishant-discharge..., or combination type. Where fire control is achieved by internal injection, or combination of internal...
30 CFR 75.1107-6 - Capacity of fire suppression devices; location and direction of nozzles.
Code of Federal Regulations, 2014 CFR
2014-07-01
... withstand rough usage and vibration when installed on mining equipment. (b) The extinguishant-discharge..., or combination type. Where fire control is achieved by internal injection, or combination of internal...
NASA Technical Reports Server (NTRS)
Kegley, Jeffrey; Haight, Harlan; Hogue, William; Carpenter, Jay; Siler, Richard; Wright, Ernie; Eng, Ron; Baker, Mark; McCracken, Jeff
2005-01-01
Marshall Space Flight Center's X-ray & Cryogenic Test Facility (XRCF) has been performing optical wavefront testing and thermal structural deformation testing at subliquid nitrogen cryogenic temperatures since 1999. Recent modifications have been made to the facility in support of the James Webb Space Telescope (JWST) program. The test article envelope and the chamber's refrigeration capacity have both been increased. A new larger helium-cooled enclosure has been added to the existing enclosure increasing both the cross-sectional area and the length. This new enclosure is capable of supporting six JWST Primary Mirror Segment Assemblies. A second helium refrigeration system has been installed essentially doubling the cooling capacity available at the facility. Modifications have also been made to the optical instrumentation area. Improved access is now available for both the installation and operation of optical instrumentation outside the vacuum chamber. Chamber configuration, specifications, and performance data will be presented.
Residential solar-heating system-design package
NASA Technical Reports Server (NTRS)
1979-01-01
Design package for modular solar heating system includes performance specifications, design data, installation guidelines, and other information that should be valuable to those interested in system (or similar systems) for projected installation. When installed in insulated "energy saver" home, system can supply large percentage of total energy needs of building.
26 CFR 1.453A-0 - Table of contents.
Code of Federal Regulations, 2010 CFR
2010-04-01
...-1Installment method of reporting income by dealers in personal property. (a) In general. (b) Effect of security. (c) Definition of dealer, sale, and sale on the installment plan. (d) Installment plans. (1... property. (1) In general. (2) Gross profit and total contract price. (3) Carrying changes not included in...
30 CFR 77.509 - Transformers; installation and guarding.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or...
30 CFR 77.509 - Transformers; installation and guarding.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or...
30 CFR 77.509 - Transformers; installation and guarding.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or...
30 CFR 77.509 - Transformers; installation and guarding.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or...
30 CFR 77.509 - Transformers; installation and guarding.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Transformers; installation and guarding. 77.509... COAL MINES Electrical Equipment-General § 77.509 Transformers; installation and guarding. (a) Transformers shall be of the totally enclosed type, or shall be placed at least 8 feet above the ground, or...
Improved hydrocracker temperature control: Mobil quench zone technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sarli, M.S.; McGovern, S.J.; Lewis, D.W.
1993-01-01
Hydrocracking is a well established process in the oil refining industry. There are over 2.7 million barrels of installed capacity world-wide. The hydrocracking process comprises several families of highly exothermic reactions and the total adiabatic temperature rise can easily exceed 200 F. Reactor temperature control is therefore very important. Hydrocracking reactors are typically constructed with multiple catalyst beds in series. Cold recycle gas is usually injected between the catalyst beds to quench the reactions, thereby controlling overall temperature rise. The design of this quench zone is the key to good reactor temperature control, particularly when processing poorer quality, i.e., highermore » heat release, feeds. Mobil Research and Development Corporation (MRDC) has developed a robust and very effective quench zone technology (QZT) package, which is now being licensed to the industry for hydrocracking applications.« less
NASA Astrophysics Data System (ADS)
Kirillova, Ariadna; Krylova, Anna
2017-10-01
The article considers the features of the structure and functioning of energy supply facilities for housing and communal services of municipalities with the identification and analysis of problems, substantiates the main directions of improving the organizational and economic mechanism for the development of alternative sources of electricity supply, taking into account modern innovative energy-efficient technologies. The choice of a rational option for electricity supply to settlements and the region is considered on the basis of an analysis of geographical, climatic and socio-economic conditions, as well as engineering and financial opportunities, the availability of trunk, interregional and other networks, the total installed capacity of regional power plants and a set of other technical and economic Characteristics inherent in the region and its municipalities.
Capacity value of energy storage considering control strategies.
Shi, Nian; Luo, Yi
2017-01-01
In power systems, energy storage effectively improves the reliability of the system and smooths out the fluctuations of intermittent energy. However, the installed capacity value of energy storage cannot effectively measure the contribution of energy storage to the generator adequacy of power systems. To achieve a variety of purposes, several control strategies may be utilized in energy storage systems. The purpose of this paper is to study the influence of different energy storage control strategies on the generation adequacy. This paper presents the capacity value of energy storage to quantitatively estimate the contribution of energy storage on the generation adequacy. Four different control strategies are considered in the experimental method to study the capacity value of energy storage. Finally, the analysis of the influence factors on the capacity value under different control strategies is given.
NASA Astrophysics Data System (ADS)
Zhang, Yin; Wei, Zhiyuan; Zhang, Yinping; Wang, Xin
2017-12-01
Urban heating in northern China accounts for 40% of total building energy usage. In central heating systems, heat is often transferred from heat source to users by the heat network where several heat exchangers are installed at heat source, substations and terminals respectively. For given overall heating capacity and heat source temperature, increasing the terminal fluid temperature is an effective way to improve the thermal performance of such cascade heat exchange network for energy saving. In this paper, the mathematical optimization model of the cascade heat exchange network with three-stage heat exchangers in series is established. Aim at maximizing the cold fluid temperature for given hot fluid temperature and overall heating capacity, the optimal heat exchange area distribution and the medium fluids' flow rates are determined through inverse problem and variation method. The preliminary results show that the heat exchange areas should be distributed equally for each heat exchanger. It also indicates that in order to improve the thermal performance of the whole system, more heat exchange areas should be allocated to the heat exchanger where flow rate difference between two fluids is relatively small. This work is important for guiding the optimization design of practical cascade heating systems.
Septic wastewater treatment using recycled rubber particles as biofiltration media.
Oh, Jin Hwan; Park, Jaeyoung; Ellis, Timothy G
2014-01-01
Performance of the laboratory-scale recycled rubber particles (RRP) biofilter was compared to a conventional gravel system and a peat biofilter for treatment of septic tank effluent. During the study, the RRP biofilter provided similar or better performance than other systems in terms of organic removal and hydraulic capacity. After the start-up period, RRP biofilter achieved removal efficiencies for BOD5, total suspended solids (TSS), ammonia nitrogen of 96%, 93%, and 90%, respectively, over the range of hydraulic loading rates of 57-204 L/m2/d. On the other hand, the peat biofilter failed hydraulically and the gravel system showed high TSS concentrations in the effluent. RRP provided high surface area and sufficient time for biological treatment. In addition, RRP was observed to provide ammonia adsorption capacity. The results showed that RRP has the potential to be used as substitutes for natural aggregate such as gravel in septic system drainfields. The RRP biofilter can be used as alternative septic systems for the sites where an existing septic system has failed or site conditions, such as high groundwater table or small lot size, are not suitable for the installation of conventional septic systems.
Operational Experience of the Upgraded Cryogenic Systems at the Nscl
NASA Astrophysics Data System (ADS)
McCartney, A. H.; Laumer, H. L.; Jones, S. A.
2010-04-01
The National Superconducting Cyclotron Laboratory (NSCL) is a NSF-supported facility, with additional support from Michigan State University (MSU) for conducting research in nuclear and accelerator science. The facility consists of two superconducting cyclotrons and over fifty individual cryostats, each containing several superconducting magnets that are used in the beam transport system. Beginning in 1999 a major facility upgrade was started. New, larger magnets were added, increasing the total 4.5 K loads, necessitating an increase of the cryogenic capacity. A helium plant (nominal 1750-Watt at 4.5 K) was acquired from the United States Bureau of Mines where it had been operating as a pure liquefier since the early 1980's. It was refurbished for the NSCL with extensive support from the cryogenics group at Thomas Jefferson National Laboratory. The new cryogenic system came online early in 2001. The cold-mass is relatively high in relation to the installed capacity, presenting challenges during cool downs. Reliability over the last five years has been greater than 99%. An overview of the last seven years of operations of our cryogenic systems is presented that includes normal operations, testing of new equipment, noteworthy breakdowns, routine maintenance, and system reliability.
Commissioning and Operational Experience with 1 kW Class Helium Refrigerator/Liquefier for SST-1
NASA Astrophysics Data System (ADS)
Dhard, C. P.; Sarkar, B.; Misra, Ruchi; Sahu, A. K.; Tanna, V. L.; Tank, J.; Panchal, P.; Patel, J. C.; Phadke, G. D.; Saxena, Y. C.
2004-06-01
The helium refrigerator/liquefier (R/L) for the Steady State Super conducting Tokamak (SST-1) has been developed with very stringent specifications for the different operational modes. The total refrigeration capacity is 650 W at 4.5 K and liquefaction capacity of 200 l/h. A cold circulation pump is used for the forced flow cooling of 300 g/s supercritical helium (SHe) for the magnet system (SCMS). The R/L has been designed also to absorb a 200 W transient heat load of the SCMS. The plant consists of a compressor station, oil removal system, on-line purifier, Main Control Dewar (MCD) with associated heat exchangers, cold circulation pump and warm gas management system. An Integrated Flow Control and Distribution System (IFDCS) has been designed, fabricated and installed for distribution of SHe in the toroidal and poloidal field coils as well as liquid helium for cooling of 10 pairs of current leads. A SCADA based control system has been designed using PLC for R/L as well as IFDCS. The R/L has been commissioned and required parameters were achieved confirming to the process. All the test results and commissioning experiences are discussed in this paper.
Statistical Characterization of 18650-Format Lithium-Ion Cell Thermal Runaway Energy Distributions
NASA Technical Reports Server (NTRS)
Walker, William Q.; Rickman, Steven; Darst, John; Finegan, Donal; Bayles, Gary; Darcy, Eric
2017-01-01
Effective thermal management systems, designed to handle the impacts of thermal runaway (TR) and to prevent cell-to-cell propagation, are key to safe operation of lithium-ion (Li-ion) battery assemblies. Critical factors for optimizing these systems include the total energy released during a single cell TR event and the fraction of the total energy that is released through the cell casing vs. through the ejecta material. A unique calorimeter was utilized to examine the TR behavior of a statistically significant number of 18650-format Li-ion cells with varying manufacturers, chemistries, and capacities. The calorimeter was designed to contain the TR energy in a format conducive to discerning the fractions of energy released through the cell casing vs. through the ejecta material. Other benefits of this calorimeter included the ability to rapidly test of large quantities of cells and the intentional minimization of secondary combustion effects. High energy (270 Wh/kg) and moderate energy (200 Wh/kg) 18650 cells were tested. Some of the cells had an imbedded short circuit (ISC) device installed to aid in the examination of TR mechanisms under more realistic conditions. Other variations included cells with bottom vent (BV) features and cells with thin casings (0.22 1/4m). After combining the data gathered with the calorimeter, a statistical approach was used to examine the probability of certain TR behavior, and the associated energy distributions, as a function of capacity, venting features, cell casing thickness and temperature.
89. Photocopied August 1978. POWER HOUSE, GENERATOR ROOM, VIEW LOOKING ...
89. Photocopied August 1978. POWER HOUSE, GENERATOR ROOM, VIEW LOOKING EAST FROM ABOUT THE CENTER, FEBRUARY 26, 1918, AFTER MICHIGAN NORTHERN HAD BROUGHT THE GENERATOR INSTALLATION UP TO FULL CAPACITY. THE NARROW PANEL WESTINGHOUSE SWITCHBOARD INSTALLED IN 1916-17 IS AT THE UPPER RIGHT. THE NEW GENERAL ELECTRIC GENERATORS ARE BELOW THE GALLERY. NOTE THE D.C. EXCITER UNIT ON EXTENDED SHAFT ON THE UNIT IN THE FOREGROUND. A SIMILAR TYPE OF INSTALLATION WAS FOUND AT PENSTOCKS 45 THROUGH 48 AND 62 THROUGH 73. WHAT SEEM TO BE EXTENDED SHAFT UNITS IN THE BACKGROUND ARE MERELY THE OLD STANLEY ALTERNATORS BEFORE THEY HAD BEEN REMOVED FROM THE GENERATOR ROOM. (878) - Michigan Lake Superior Power Company, Portage Street, Sault Ste. Marie, Chippewa County, MI
Müller, H; Naujoks, F; Dietz, S
2002-08-01
Problems encountered during the installation and introduction of an automated anaesthesia documentation system are discussed. Difficulties have to be expected in the area of staff training because of heterogeneous experience in computer usage and in the field of online documentation of vital signs. Moreover the areas of net administration and hardware configuration as well as general administrative issues also represent possible sources of drawbacks. System administration and reliable support provided by personnel of the department of anaesthesiology assuring staff motivation and reducing time of system failures require adequately staffed departments. Based on our own experiences, we recommend that anaesthesiology departments considering the future installation and use of an automated anaesthesia documentation system should verify sufficient personnel capacities prior to their decision.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maget, H.J.R.
1979-06-15
This program consists of a design study and component development for an experimental 50-kWp photovoltaic concentrator system to supply power to the San Ramon substation of the Pacific Gas and Electric Company. The photovoltaic system is optimized to produce peaking power to relieve the air conditioning load on the PG and E system during summer afternoons; and would therefore displace oil-fired power generation capacity. No electrical storage is required. The experiment would use GaAs concentrator cells with point-focus fresnel lenses operating at 400X, in independent tracking arrays of 440 cells each, generating 3.8 kWp. Fourteen arrays, each 9 feet bymore » 33 feet, are connected electrically in series to generate the 50 kWp. The high conversion efficiency possible with GaAs concentrator cells results in a projected annual average system efficiency (AC electric power output to sunlight input) of better than 15%. The capability of GaAs cells for high temperature operation made possible the design of a total energy option, whereby thermal power from selected arrays could be used to heat and cool the control center for the installation. System design and analysis, fabrication and installation, environmental assessment, and cost projections are described in detail. (WHK)« less
Environmental impact of geothermal power plants in Aydın, Turkey
NASA Astrophysics Data System (ADS)
Yilmaz, Ersel; Ali Kaptan, Mustafa
2017-10-01
Geothermal energy is classified as a clean and sustainable energy source, like all industrial activities, geothermal energy power plants (GEPP) technology has also some positive and negative effects on the environment. In this paper are presented by attent not only on environmental impacts of GEPP onto Büyük Menderes River and fresh water sources, which ere used for irrigation of agricultural fields from tousands of years in basin, but also on water quality contents like heavy metals and gases emition due to drilling and electricity producing technology of GEPP's. Aydın province is located in the southwestern part of the region and its city center has around 300000 population. The high geothermal potential of this region became from geographical location, which is held on active tectonic Alpine-Himalaya Orogen belt with active volcanoes and young faults. Since 1980's to 2016 there is about 70.97% (662.75 MW) of installed capacity by according to the Mineral Research and Exploration General Directorate, there are totally 290 well licensed (540 explore licenses and 76 business licenses), and 31 geothermal powerplants purposely installed. Topic is important because of number of GEPP increased rapidly after 2012 to now a days to 36 in whole basin.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gagnon, Pieter; Sigrin, Ben; Gleason, Mike
As the adoption of distributed photovoltaics (DPV) has continued to rapidly increase, a national conversation has begun about the efficacy of full-retail net metering as a means of achieving the diverse objectives of electricity pricing. This conversation has prompted studies that have primarily focused on the total costs and benefits of DPV. To compliment those studies, we here characterize the potential impacts of tariff design on the customer-economics and adoption of DPV, where recent changes in Nevada are taken as a case study. We show that an increase in fixed charges more strongly impacts the payback period of small systems,more » and a decrease in credit for exported electricity more strongly impacts the payback period of large systems. We project that these combined changes will reduce DPV adoption in Nevada; total capacity in 2030 was projected to reach up to 363 MW, with 226 MW having already been installed at the end of the second quarter of 2016. In contrast, if full retail net metering had continued, DPV capacity was projected to reach up to 1,280 MW at the end of 2030, which would account for an estimated 6.5% of the total sales of electricity by NV Energy at that time. We project that the DPV systems will decrease the gross revenue from bill collection by $48 million per year under the new tariffs, whereas the decrease in gross revenue could have reached $255 million per year if full retail net metering had been continued. Although these results are given in the context of Nevada, the trends shown are intended to help information similar upcoming decisions in other states.« less
Energy consumption renewable energy development and environmental impact in Algeria - Trend for 2030
NASA Astrophysics Data System (ADS)
Sahnoune, F.; Imessad, K.; Bouakaz, D. M.
2017-02-01
The study provides a detailed analysis of the energy production and consumption in Algeria and the associated CO2 emissions. Algeria is an important energy producer (oil and natural gas). The production is currently around 155 MToe. The total primary energy consumption amounted to about 58 MToe equivalent to 1.46 Toe/capita. The energy demand is still increasing, an average annual growth rate of more than 6% per year during the last decade. The growth rate for electricity production was almost twice that of the total energy consumption. In 2015, the installed capacity of the electricity generation plants reached 17.6 GW. Electricity consumption was 64.6 TWh and is expected to reach at least 75 TWh in 2020 and 130 TWh in 2030. The already high electricity demand will double by 2030. In the structure of final energy consumption, the transport sector ranks first (36%), natural gas consumption ranks second (28.5%), followed by electricity production (27.7%). By activity, the energy sector is the main source of CO2 emissions, about ¾ of the total and this sector has the most important potential for mitigation measures. CO2 emissions from this energy sector amounted to 112.2 MT CO2 as follows: 33% transport, 31% electricity production and 26% from natural gas combustion for residential use. The integration of renewable sources in the energy mix represents for Algeria a major challenge. In 2015, Algeria adopted an ambitious program for development of renewable energy. The target is to achieve 22 GW capacity of electricity from renewable by 2030 to reach a rate of 27 % of national electricity generation through renewable sources. By implementing this program, CO2 emissions of power generation will be reduced by more than 18% in 2030.
78 FR 74126 - Combined Notice of Filings #1
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-10
... Installed Capacity Requirement, Hydro Quebec Interconnection Capability Credits and Related Values for the.... Take notice that the Commission received the following electric reliability filings: Docket Numbers: RR13-3-001. Applicants: North American Electric Reliability Corporation. Description: Compliance Filing...
Design phase identification of high pile rebound soils : final report
DOT National Transportation Integrated Search
2010-12-15
An engineering problem has occurred when installing displacement piles in certain soils. During driving, piles are rebounding excessively during each hammer blow, causing delay and as a result may not achieve the required design capacities. Piles dri...
NASA Astrophysics Data System (ADS)
Lee, O.; Choi, J.; Lee, J.; Kim, S.
2017-12-01
Since the 20th century, urbanization has resulted in increased impermeable land surface and reduced infiltration capacity in catchment scale. Especially, when agriculture area or forest area would be developed into urban area, it can cause more runoff in the same climate condition. Such urbanization causes problems such as changes in hydrological cycle and ecosystem disturbance. Various methods have been proposed worldwide to reduce the impact of such urbanization. Among the various strategies, the low-impact development is a development strategy that aims to return to pre-development state by minimizing the change of the hydrological cycle due to urbanization. In this strategy, the infiltration and/or surface storage of stormwater runoff can be increased through the installation of various facilities. In this study, a facility capacity design strategy is proposed to return into the natural water cycle through the installation of various LID facilities. This is accomplished by determining the optimal LID facility design capacity through which flow duration curves remain the same before and after urban development. For this purpose, EPA-SWMM is constructed with a part of Busan Metropolitan City Noksan Industrial Complex as a virtual processing area. Under the various land-use scenarios, the optimum design capacity of various LID facilities capable of retaining the flow duration curve before and after development is determined. In addition, the sensitivity of the optimal design capacity of LID facilities is analyzed according to the design specifications of various LID facilities, the local rainfall characteristics, and the size of the treatment area. Acknowledgement This research was supported by a grant (2016000200002) from Public Welfare Technology Development Program funded by Ministry of Environment of Korean government.
Distribution of high-temperature (>150 °C) geothermal resources in California
Sass, John H.; Priest, Susan S.
2002-01-01
California contains, by far, the greatest geothermal generating capacity in the United States, and with the possible exception of Alaska, the greatest potential for the development of additional resources. California has nearly 2/3 of the US geothermal electrical installed capacity of over 3,000 MW. Depending on assumptions regarding reservoir characteristics and future market conditions, additional resources of between 2,000 and 10,000 MWe might be developed (see e.g., Muffler, 1979).
Solar energy system installed at Mount Rushmore National Visitor Center in Keystone, South Dakota
NASA Technical Reports Server (NTRS)
1979-01-01
The design and installation of the solar energy system installed at the Mount Rushmore Visitor Center is described. The system was designed to furnish about 45 percent of the heating for the total facility and about 53 percent partial cooling for the 2000 square foot observatory.
ERIC Educational Resources Information Center
Merilees, Bobbie
1992-01-01
Reports results of a survey of vendors of large and microcomputer-based integrated library systems. Data presented on Canadian installations include total systems installed, comparisons with earlier years, market segments, and installations by type of library (excluding school). International sales and automation requirements for music are…
A learning curve for solar thermal power
NASA Astrophysics Data System (ADS)
Platzer, Werner J.; Dinter, Frank
2016-05-01
Photovoltaics started its success story by predicting the cost degression depending on cumulated installed capacity. This so-called learning curve was published and used for predictions for PV modules first, then predictions of system cost decrease also were developed. This approach is less sensitive to political decisions and changing market situations than predictions on the time axis. Cost degression due to innovation, use of scaling effects, improved project management, standardised procedures including the search for better sites and optimization of project size are learning effects which can only be utilised when projects are developed. Therefore a presentation of CAPEX versus cumulated installed capacity is proposed in order to show the possible future advancement of the technology to politics and market. However from a wide range of publications on cost for CSP it is difficult to derive a learning curve. A logical cost structure for direct and indirect capital expenditure is needed as the basis for further analysis. Using derived reference cost for typical power plant configurations predictions of future cost have been derived. Only on the basis of that cost structure and the learning curve levelised cost of electricity for solar thermal power plants should be calculated for individual projects with different capacity factors in various locations.
Lessons learned from hybrid wind/PV village power system installations in Mexico
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bergey, M.
1995-09-01
In the last three years eight decentralized village power systems utilizing small wind turbines as the primary energy source have been installed in rural Mexico. Hybrid wind/PV systems have been installed in five States and by three vendors. Seven out of the eight systems, which range i size from 9.3--71.2kW in combined wind and PV capacity, utilize one or more 10 kW wind turbines. All of these installations have battery banks and use static inverters to provide AC power for distribution to homes, businesses, and community facilities. On all but one of the systems a diesel generator is used tomore » provide back-up power. This paper attempts to summarize the range of costs and economics, performance, and operational experiences for all eight installations. Several of the systems are monitored for performance, including one that is extensively monitored under a cooperative program between the Instituto de Investigaciones Electricas and Sandia National Laboratory. Lessons learned from these systems provide insights that may allow future village power systems of this architecture to be installed at lower costs, to be operated more effectively and efficiently, and to be better able to satisfy customer requirements.« less
Expediency of wet-mix shotcreting in mines of Vostoktsvetmet
NASA Astrophysics Data System (ADS)
Shaposhnik, YuN
2018-03-01
This paper offers a substantiation of the transition from heavy and difficult-to-install steel frame support to the cheaper and simpler reinforced shotcrete lining (at the same bearing-capacity of the support). The process line for the preparation of the shotcrete mix is designed. The author of the paper presents calculation of the material inputs and labor costs of installation of different support types in Kazakhstan Mines. The economic efficiency of the wet-mix shotcrete spraying technology is illustrated in terms of Orlov and Artemevsk Mines.
NASA Astrophysics Data System (ADS)
Ye, X.; Tang, Q.; Li, T.; Wang, Y. L.; Zhang, X.; Ye, S. Y.
2017-05-01
The wind, photovoltaic and hydro power bundled transmission system attends to become common in Northwest and Southwest of China. To make better use of the power complementary characteristic of different power sources, the installed capacity proportion of wind, photovoltaic and hydro power, and their capacity distribution for each integration node is a significant issue to be solved in power system planning stage. An optimal capacity proportion and capacity distribution model for wind, photovoltaic and hydro power bundled transmission system is proposed here, which considers the power out characteristic of power resources with different type and in different area based on real operation data. The transmission capacity limit of power grid is also considered in this paper. Simulation cases are tested referring to one real regional system in Southwest China for planning level year 2020. The results verify the effectiveness of the model in this paper.
Installation package for air flat plate collector
NASA Technical Reports Server (NTRS)
1977-01-01
The Solar 2 dimensions are four feet by eight feet by two and one half inches. The collector weighs 130 pounds and has an effective solar collection area of over 29.5 square feet. This area represents 95 percent of the total surface of the collector. The installation, operation and maintenance manual, safety hazard analysis, special handling instructions, materials list, installation concept drawings, warranty and certification statement are included in the installation package.
33 CFR 183.33 - Maximum weight capacity: Inboard and inboard-outdrive boats.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (iv) Weight of full permanent fuel tanks. (3) “Machinery weight” is the combined weight of installed engines or motors, control equipment, drive units, and batteries. [CGD 72-61R, 37 FR 15782, Aug. 4, 1972...
Low-intensity, stocker-based channel catfish culture
USDA-ARS?s Scientific Manuscript database
Low-intensity Channel Catfish production is characterized by low stocking rates, low installed aeration capacity, and no automated dissolved oxygen monitoring. Two studies conducted in nine 0.25-acre ponds quantified production characteristics of stocker Channel Catfish stocked for low-intensity foo...
13 CFR 300.1 - Introduction and mission.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Investments in infrastructure development, capacity building and business development in order to attract private capital investments and higher-skill, higher-wage jobs to Regions experiencing substantial and... installations, changing trade patterns and the depletion of natural resources. EDA Investments generally take...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2013 CFR
2013-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2011 CFR
2011-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
7 CFR 1753.68 - Purchasing special equipment.
Code of Federal Regulations, 2014 CFR
2014-01-01
... operating systems to increase system capacity that require components made by the manufacturer of the... operating systems in the borrower's system, or with complete systems of special equipment from other... AGRICULTURE TELECOMMUNICATIONS SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Purchase and Installation of...
30 CFR 250.915 - What are the CVA's primary responsibilities?
Code of Federal Regulations, 2010 CFR
2010-07-01
... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Platforms and Structures... or organizations acting as CVAs must not function in any capacity that would create a conflict of... design, fabrication and installation of the platform. ...
Selection of the surface water treatment technology - a full-scale technological investigation.
Pruss, Alina
2015-01-01
A technological investigation was carried out over a period of 2 years to evaluate surface water treatment technology. The study was performed in Poland, in three stages. From November 2011 to July 2012, for the first stage, flow tests with a capacity of 0.1-1.5 m³/h were performed simultaneously in three types of technical installations differing by coagulation modules. The outcome of the first stage was the choice of the technology for further investigation. The second stage was performed between September 2012 and March 2013 on a full-scale water treatment plant. Three large technical installations, operated in parallel, were analysed: coagulation with sludge flotation, micro-sand ballasted coagulation with sedimentation, coagulation with sedimentation and sludge recirculation. The capacity of the installations ranged from 10 to 40 m³/h. The third stage was also performed in a full-scale water treatment plant and was aimed at optimising the selected technology. This article presents the results of the second stage of the full-scale investigation. The critical treatment process, for the analysed water, was the coagulation in an acidic environment (6.5 < pH < 7.0) carried out in a system with rapid mixing, a flocculation chamber, preliminary separation of coagulation products, and removal of residual suspended solids through filtration.
Capacity value of energy storage considering control strategies
Luo, Yi
2017-01-01
In power systems, energy storage effectively improves the reliability of the system and smooths out the fluctuations of intermittent energy. However, the installed capacity value of energy storage cannot effectively measure the contribution of energy storage to the generator adequacy of power systems. To achieve a variety of purposes, several control strategies may be utilized in energy storage systems. The purpose of this paper is to study the influence of different energy storage control strategies on the generation adequacy. This paper presents the capacity value of energy storage to quantitatively estimate the contribution of energy storage on the generation adequacy. Four different control strategies are considered in the experimental method to study the capacity value of energy storage. Finally, the analysis of the influence factors on the capacity value under different control strategies is given. PMID:28558027
Solar, Install, Mount, Production, Labor, Equipment Balance of Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gentry, Russell; Al-Haddad, Tristan; Valdes, Francisco
2015-08-27
The GTRI led project team in partnership with the DOE, universities, and numerous industry leaders, have advanced the mission of the DOE EERE, the Solar Energy Technologies Program, and the SunShot Initiative by accelerating the research, development, and demonstration of solar PV technologies that provide Extreme Balance of Systems Cost Reductions (BOS-X). The research produced 132 design concepts, resulting in 19 invention disclosures, five patent applications, four 90% pre-commercial designs, and three licensed technologies. Technology practice rights were obtained by an industry partner, and a new solar commercial start-up company was launched in Atlanta as a result of this project.more » Innovations in residential, commercial, and utility scale balance of systems technologies were realized through an unprecedented multi-disciplinary university/industry partnership with over 50 students and 24 faculty members that produced 18 technical publications, a PhD thesis, and two commercially deployed operating prototypes. The technical effectiveness and economic feasibility of the multidisciplinary systems based approach executed by the project team was realized through 1) a comprehensive evaluation of industry, regulatory, and public stakeholder requirements; 2) numerous industry/student/faculty engagements in design studios, technical conferences, and at solar PV installation sites; 3) time and motion studies with domain experts that provided technical data and costs for each phase and component of the solar PV installation processes; 4) extensive wind tunnel and systems engineering modeling; and 5) design, construction, and demonstration of the selected technologies in the field at high profile sites in Atlanta. The SIMPLE BOS project has benefitted the public in the following ways: • Workforce development: The launch of a start-up company to commercialize the DOE funded SIMPLE BoS designs has directly created 9 new jobs in the State of Georgia. As of November 2014, the Georgia solar industry employs 2,890 solar workers, representing a 12.8% growth in employment over 2013 (Solar Jobs Census, 2014). • Growth of the solar industry: The DOE SIMPLE BoS SunShot Award to GTARC accelerated the growth of the solar industry in Georgia, due to the national publicity of the award and the engagement of numerous solar PV manufacturers, designers, and installers on the SIMPLE BoS project. In 2011 less than 50 megawatts of solar PV capacity existed in Georgia; by 2016 Georgia may reach nearly 800 MW of total approved solar capacity with the 2012 Georgia Power Advanced Solar Initiative. • Technical outreach and publications: Georgia Tech has participated in numerous technical symposiums, technology demonstrations, campus solar PV tours, and produced 18 publications for the solar industry and general public. • Cost reductions for consumers: The SIMPLE BoS pre-commercial systems and discoveries enable cost reductions of 50% or more in labor and materials for residential, commercial and utility scale PV installations.« less
International energy annual 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-12-01
The International Energy Annual presents information and trends on world energy production and consumption for petroleum, natural gas, coal, and electricity. Production and consumption data are reported in standard units as well as British thermal units (Btu). Trade and reserves are shown for petroleum, natural gas, and coal. Data are provided on crude oil refining capacity and electricity installed capacity by type. Prices are included for selected crude oils and for refined petroleum products in selected countries. Population and Gross Domestic Product data are also provided.
Final Report. Solar Assist for Administration Building and Community Gym/Pool
DOE Office of Scientific and Technical Information (OSTI.GOV)
Synder, Randy; Bresette, Joseph
2015-06-23
Tonto Apache Tribe applied to the Department of Energy’s “Tribal Energy Program” for the “Community Scale Clean Energy Projects” in Indian Country in 2013 to implement a solar project to reduce energy use in two tribal buildings. Total estimated project cost was $804,140, with the Department and Tribe each providing 50% of the project costs. Photovoltaic systems totaling 75 kW on the Administration Building and 192 kW on the Gymnasium were installed. We used roof tops and installed canopies in adjacent parking areas for mounting the systems. The installed systems were designed to offset 65% of the facilities electric load.
Deploying temporary networks for upscaling of sparse network stations
NASA Astrophysics Data System (ADS)
Coopersmith, Evan J.; Cosh, Michael H.; Bell, Jesse E.; Kelly, Victoria; Hall, Mark; Palecki, Michael A.; Temimi, Marouane
2016-10-01
Soil observations networks at the national scale play an integral role in hydrologic modeling, drought assessment, agricultural decision support, and our ability to understand climate change. Understanding soil moisture variability is necessary to apply these measurements to model calibration, business and consumer applications, or even human health issues. The installation of soil moisture sensors as sparse, national networks is necessitated by limited financial resources. However, this results in the incomplete sampling of the local heterogeneity of soil type, vegetation cover, topography, and the fine spatial distribution of precipitation events. To this end, temporary networks can be installed in the areas surrounding a permanent installation within a sparse network. The temporary networks deployed in this study provide a more representative average at the 3 km and 9 km scales, localized about the permanent gauge. The value of such temporary networks is demonstrated at test sites in Millbrook, New York and Crossville, Tennessee. The capacity of a single U.S. Climate Reference Network (USCRN) sensor set to approximate the average of a temporary network at the 3 km and 9 km scales using a simple linear scaling function is tested. The capacity of a temporary network to provide reliable estimates with diminishing numbers of sensors, the temporal stability of those networks, and ultimately, the relationship of the variability of those networks to soil moisture conditions at the permanent sensor are investigated. In this manner, this work demonstrates the single-season installation of a temporary network as a mechanism to characterize the soil moisture variability at a permanent gauge within a sparse network.
NASA Astrophysics Data System (ADS)
Konkol, Jakub; Bałachowski, Lech
2017-03-01
In this paper, the whole process of pile construction and performance during loading is modelled via large deformation finite element methods such as Coupled Eulerian Lagrangian (CEL) and Updated Lagrangian (UL). Numerical study consists of installation process, consolidation phase and following pile static load test (SLT). The Poznań site is chosen as the reference location for the numerical analysis, where series of pile SLTs have been performed in highly overconsolidated clay (OCR ≈ 12). The results of numerical analysis are compared with corresponding field tests and with so-called "wish-in-place" numerical model of pile, where no installation effects are taken into account. The advantages of using large deformation numerical analysis are presented and its application to the pile designing is shown.
Netbook User’s Guide and Installation Manual.
1997-01-31
The general purpose of Netbook is to add value to the information available online, by developing a collaborative environment within which that...information can be effectively accessed, stored, annotated, and structured. Netbook is a prototype tool that provides users with the capacity for
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-29
... turbine bay and powerhouse combination; (3) five turbine-generators with an installed capacity of 200 kilowatt (kW) each, submerged on the upstream side of the reserve turbine bay and receiving water via a...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bolinger, Mark; Seel, Joachim
The utility-scale solar sector—defined here to include any ground-mounted photovoltaic (“PV”), concentrating photovoltaic (“CPV”), or concentrating solar power (“CSP”) project that is larger than 5 MWAC in capacity—has led the overall U.S. solar market in terms of installed capacity since 2012. It is expected to maintain its market-leading position for at least another five years, driven in part by December 2015’s three-year extension of the 30% federal investment tax credit (“ITC”) through 2019 (coupled with a favorable switch to a “start construction” rather than a “placed in service” eligibility requirement, and a gradual phase down of the credit to 10%more » by 2022). In fact, in 2016 alone, the utility-scale sector is projected to install more than twice as much new capacity as it ever has previously in a single year. This unprecedented boom makes it difficult, yet more important than ever, to stay abreast of the latest utility-scale market developments and trends. This report—the fourth edition in an ongoing annual series—is intended to help meet this need, by providing in-depth, annually updated, data-driven analysis of the utility-scale solar project fleet in the United States. Drawing on empirical project-level data from a wide range of sources, this report analyzes not just installed project costs or prices—i.e., the traditional realm of most solar economic analyses—but also operating costs, capacity factors, and power purchase agreement (“PPA”) prices from a large sample of utility-scale solar projects throughout the United States. Given its current dominance in the market, utility-scale PV also dominates much of this report, though data from CPV and CSP projects are also presented where appropriate.« less
Nuclear power generation and fuel cycle report 1997
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-09-01
Nuclear power is an important source of electric energy and the amount of nuclear-generated electricity continued to grow as the performance of nuclear power plants improved. In 1996, nuclear power plants supplied 23 percent of the electricity production for countries with nuclear units, and 17 percent of the total electricity generated worldwide. However, the likelihood of nuclear power assuming a much larger role or even retaining its current share of electricity generation production is uncertain. The industry faces a complex set of issues including economic competitiveness, social acceptance, and the handling of nuclear waste, all of which contribute to themore » uncertain future of nuclear power. Nevertheless, for some countries the installed nuclear generating capacity is projected to continue to grow. Insufficient indigenous energy resources and concerns over energy independence make nuclear electric generation a viable option, especially for the countries of the Far East.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hinz, Nick; Coolbaugh, Mark; Shevenell, Lisa
There are currently 74 productive geothermal systems associated with volcanic centers (VCs) in arcs globally, including actively producing systems, past producing systems, and systems with successful flow tests. The total installed or tested capacity of these 74 geothermal systems is 7,605 MWe, ranging from 0.7 MWe each at Copahue, Chile and Barkhatnaya Sopka, Kamchatka to 795 MWe, Larderello, Italy, and averaging 90.5 MWe per system. These 74 productive VCs constitute 10% of 732 VCs distributed across more than a dozen major arcs around the world. The intra-arc (within-arc) tectonic setting is highly variable globally, ranging from extension to transtension, transpression,more » or compression. Furthermore, the shear strain associated with oblique plate convergence can be accommodated by either intra-arc or arc-marginal deformation. The structural-tectonic settings of these 74 productive VCs were characterized to add to a global catalog of parameters to help guide future exploration, development, and regional resource potential.« less
NASA Technical Reports Server (NTRS)
Carmichael, D. C.; Gaines, G. B.; Sliemers, F. A.; Kistler, C. W.; Igou, R. D.
1976-01-01
Published and unpublished information relating to encapsulation systems and materials properties was collected by searching the literature and appropriate data bases (over 1,300 documents were selected and reviewed) and by personal contacts including site and company visits. A data tabulation summarizing world experience with terrestrial photovoltaic arrays (50 installations) is presented in the report. Based on criteria of properties, processability, availability, and cost, candidate materials were identified which have potential for use in encapsulation systems for arrays with a lifetime of over 20 years high reliability, an efficiency greater than 10 percent, a total price less than $500/kW, and a production capacity of 500,000 kW/yr. The recommended materials (all commercially available) include, depending upon the device design, various borosilicate and soda-lime glasses and numerous polymerics suitable for specific encapsulation system functions.
NASA Astrophysics Data System (ADS)
Breyer, Christian; Afanasyeva, Svetlana; Brakemeier, Dietmar; Engelhard, Manfred; Giuliano, Stefano; Puppe, Michael; Schenk, Heiko; Hirsch, Tobias; Moser, Massimo
2017-06-01
The main objective of this research is to present a solid foundation of capex projections for the major solar energy technologies until the year 2030 for further analyses. The experience curve approach has been chosen for this capex assessment, which requires a good understanding of the projected total global installed capacities of the major solar energy technologies and the respective learning rates. A literature survey has been conducted for CSP tower, CSP trough, PV and Li-ion battery. Based on the literature survey a base case has been defined for all technologies and low growth and high growth cases for further sensitivity analyses. All results are shown in detail in the paper and a comparison to the expectation of a potentially major investor in all of these technologies confirmed the derived capex projections in this paper.
NASA Astrophysics Data System (ADS)
Kalyakin, S. G.; Kirillov, P. L.; Baranaev, Yu. D.; Glebov, A. P.; Bogoslovskaya, G. P.; Nikitenko, M. P.; Makhin, V. M.; Churkin, A. N.
2014-08-01
The state of nuclear power engineering as of February 1, 2014 and the accomplished elaborations of a supercritical-pressure water-cooled reactor are briefly reviewed, and the prospects of this new project are discussed based on this review. The new project rests on the experience gained from the development and operation of stationary water-cooled reactor plants, including VVERs, PWRs, BWRs, and RBMKs (their combined service life totals more than 15 000 reactor-years), and long-term experience gained around the world with operation of thermal power plants the turbines of which are driven by steam with supercritical and ultrasupercritical parameters. The advantages of such reactor are pointed out together with the scientific-technical problems that need to be solved during further development of such installations. The knowledge gained for the last decade makes it possible to refine the concept and to commence the work on designing an experimental small-capacity reactor.
NASA Astrophysics Data System (ADS)
Indra Siswantara, Ahmad; Pujowidodo, Hariyotejo; Darius, Asyari; Ramdlan Gunadi, Gun Gun
2018-03-01
This paper presents the mathematical modeling analysis on cooling system in a combined cycle power plant. The objective of this study is to get the impact of cooling water upsurge on plant performance and operation, using Engineering Equation Solver (EES™) tools. Power plant installed with total power capacity of block#1 is 505.95 MWe and block#2 is 720.8 MWe, where sea water consumed as cooling media at two unit condensers. Basic principle of analysis is heat balance calculation from steam turbine and condenser, concern to vacuum condition and heat rate values. Based on the result shown graphically, there were impact the upsurge of cooling water to increase plant heat rate and vacuum pressure in condenser so ensued decreasing plant efficiency and causing possibility steam turbine trip as back pressure raised from condenser.
Wu, Hai Bing; Fang, Hai Lan; Peng, Hong Ling
2016-05-01
The effects of different vegetation types, compaction ways and soil basic physico-chemical properties on soil water reservoir in the typical newly-established green belts of Shanghai Chenshan Botanical Garden were studied. The results showed that the total reservoir capacity, detention capacity and effective storage for the Botanical Garden were lower than those of natural forests. However, the dead storage was very high accounting for 60.6% of the total reservoir capacity, resulting in reduced flood storage and drainage capacity for the greens. The total reservoir capacity and detention capacity of different vegetation types were in order of brush land> tree land> grassland> bamboo land> bare land. The effective storages of the brush land and the tree land were relatively high, whereas those of the bare land and the bamboo land were lower. The ratios of the dead storage over the total re-servoir capacity in the bare land and the bamboo land were relatively high with the values 65.5% and 67.6%, respectively. The total reservoir capacity, detention capacity and effective storage of the brush land were significantly different from those of the bare land. The vegetation significantly improved the water storage and retention capacity for the soil, while the compaction by large machinery and man-caused trampling reduced the total reservoir capacity, detention capacity and effective storage of soils. The water reservoir properties were influenced by soil bulk density, saturated hydraulic conductivity, capillary porosity, non-capillary porosity, total porosity, clay and organic matter contents. Therefore, improving the soil physico-chemical properties might increase the soil reservoir capacity of the urban green belt effectively.
Dietary total antioxidant capacity and mortality in the PREDIMED study.
Henríquez-Sánchez, P; Sánchez-Villegas, A; Ruano-Rodríguez, C; Gea, A; Lamuela-Raventós, R M; Estruch, R; Salas-Salvadó, J; Covas, M I; Corella, D; Schröder, H; Gutiérrez-Bedmar, M; Santos-Lozano, J M; Pintó, X; Arós, F; Fiol, M; Tresserra-Rimbau, A; Ros, E; Martínez-González, M A; Serra-Majem, L
2016-02-01
The aim of the present study was to assess the association between the dietary total antioxidant capacity, the dietary intake of different antioxidants and mortality in a Mediterranean population at high cardiovascular disease risk. A total of 7,447 subjects from the PREDIMED study (multicenter, parallel group, randomized controlled clinical trial), were analyzed treating data as an observational cohort. Different antioxidant vitamin intake and total dietary antioxidant capacity were calculated from a validated 137-item food frequency questionnaire at baseline and updated yearly. Deaths were ascertained through contact with families and general practitioners, review of medical records and consultation of the National Death Index. Cox regression models were fitted to assess the relationship between dietary total antioxidant capacity and mortality. Dietary total antioxidant capacity was estimated using ferric-reducing antioxidant power assays. A total of 319 deaths were recorded after a median follow-up of 4.3 years. Subjects belonging to the upper quintile of antioxidant capacity were younger, ex-smokers, with high educational level, and more active and had higher alcohol intake. Multivariable-adjusted models revealed no statistically significant difference between total dietary antioxidant capacity and mortality (Q5 vs. Q1 ref HR 0.85; 95% CI 0.60-1.20) neither for the intake of all the vitamins studied. No statistically significant association was found between antioxidant capacity and total mortality in elderly subjects at high cardiovascular risk.
Luo, Hong-Hai; Zhang, Hong-Zhi; Zhang, Ya-Li; Zhang, Wang-Feng
2012-02-01
Taking cotton cultivar Xinluzao 13 as test material, a soil column culture expenment was conducted to study the effects of water storage in deeper (> 60 cm) soil layer on the root growth and its relations with the aboveground growth of the cultivar in arid area with drip irrigation under mulch. Two levels of water storage in 60-120 cm soil layer were installed, i. e., well-watered and no watering, and for each, the moisture content in 0-40 cm soil layer during growth period was controlled at two levels, i.e., 70% and 55% of field capacity. It was observed that the total root mass density of the cultivar and its root length density and root activity in 40-120 cm soil layer had significant positive correlations with the aboveground dry mass. When the moisture content in 0-40 cm soil layer during growth season was controlled at 70% of field capacity, the total root mass density under well-watered and no watering had less difference, but the root length density and root activity in 40-120 cm soil layer under well-watered condition increased, which enhanced the water consumption in deeper soil layer, increased the aboveground dry mass, and finally, led to an increased economic yield and higher water use efficiency. When the moisture content in 0-40 cm soil layer during growth season was controlled at 55% of field capacity and the deeper soil layer was well-watered, the root/shoot ratio and root length density in 40-120 cm soil layer and the root activity in 80-120 cm soil layer were higher, the water consumption in deeper soil layer increased, but it was still failed to adequately compensate for the negative effects of water deficit during growth season on the impaired growth of roots and aboveground parts, leading to a significant decrease in the economic yield, as compared with that at 70% of field capacity. Overall, sufficient water storage in deeper soil layer and a sustained soil moisture level of 65% -75% of field capacity during growth period could promote the downward growth of cotton roots, which was essential for achieving water-saving and high-yielding cultivation of cotton with drip irrigation under mulch.
75 FR 11104 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-10
... energy produced (wind, solar, and manure/methane digester), installation cost, year installed, if any energy was sold onto a power grid, and the average payment received per kilowatt hour or total amount of...
Code of Federal Regulations, 2013 CFR
2013-07-01
... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...
Code of Federal Regulations, 2012 CFR
2012-07-01
... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... install, operate, and maintain each CEMS to monitor carbon monoxide (CO) or total hydrocarbons (THC) and... emission control device. (b) To comply with the CO or THC percent reduction emission limitation, you may install, operate, and maintain a CEMS to monitor CO or THC and O2 at both the inlet and the outlet of the...
NASA Astrophysics Data System (ADS)
Yang, Junnan; Li, Xiaoyuan; Peng, Wei; Wagner, Fabian; Mauzerall, Denise L.
2018-06-01
Solar photovoltaic (PV) electricity generation can greatly reduce both air pollutant and greenhouse gas emissions compared to fossil fuel electricity generation. The Chinese government plans to greatly scale up solar PV installation between now and 2030. However, different PV development pathways will influence the range of air quality and climate benefits. Benefits depend on how much electricity generated from PV is integrated into power grids and the type of power plant displaced. Using a coal-intensive power sector projection as the base case, we estimate the climate, air quality, and related human health benefits of various 2030 PV deployment scenarios. We use the 2030 government goal of 400 GW installed capacity but vary the location of PV installation and the extent of inter-provincial PV electricity transmission. We find that deploying distributed PV in the east with inter-provincial transmission maximizes potential CO2 reductions and air quality-related health benefits (4.2% and 1.2% decrease in national total CO2 emissions and air pollution-related premature deaths compared to the base case, respectively). Deployment in the east with inter-provincial transmission results in the largest benefits because it maximizes displacement of the dirtiest coal-fired power plants and minimizes PV curtailment, which is more likely to occur without inter-provincial transmission. We further find that the maximum co-benefits achieved with deploying PV in the east and enabling inter-provincial transmission are robust under various maximum PV penetration levels in both provincial and regional grids. We find large potential benefits of policies that encourage distributed PV deployment and facilitate inter-provincial PV electricity transmission in China.
On-site or off-site treatment of medical waste: a challenge
2014-01-01
Treating hazardous-infectious medical waste can be carried out on-site or off-site of health-care establishments. Nevertheless, the selection between on-site and off-site locations for treating medical waste sometimes is a controversial subject. Currently in Iran, due to policies of Health Ministry, the hospitals have selected on-site-treating method as the preferred treatment. The objectives of this study were to assess the current condition of on-site medical waste treatment facilities, compare on-site medical waste treatment facilities with off-site systems and find the best location of medical waste treatment. To assess the current on-site facilities, four provinces (and 40 active hospitals) were selected to participate in the survey. For comparison of on-site and off-site facilities (due to non availability of an installed off-site facility) Analytical Hierarchy Process (AHP) was employed. The result indicated that most on-site medical waste treating systems have problems in financing, planning, determining capacity of installations, operation and maintenance. AHP synthesis (with inconsistency ratio of 0.01 < 0.1) revealed that, in total, the off-site treatment of medical waste was in much higher priority than the on-site treatment (64.1% versus 35.9%). According to the results of study it was concluded that the off-site central treatment can be considered as an alternative. An amendment could be made to Iran’s current medical waste regulations to have infectious-hazardous waste sent to a central off-site installation for treatment. To begin and test this plan and also receive the official approval, a central off-site can be put into practice, at least as a pilot in one province. Next, if it was practically successful, it could be expanded to other provinces and cities. PMID:24739145
Palenzuela, P; Miralles-Cuevas, S; Cabrera-Reina, A; Cornejo-Ponce, L
2018-06-22
In the context of a regional Chilean project (FIC Taltape project, BIP code 30158422-0), a multi-effect distillation (MED) pilot plant has been built and installed in a small community in the north of Chile (Taltape, Arica) in order to supply treated water for agricultural and domestic purposes. The aim of this paper is to assess the techno-economic feasibility of this system for supplying water with the required quality to the population. The characterization of the feed water and the effluents from the MED pilot plant (distillate and brine), obtained during five months of operation, has been firstly performed. Then, the prediction of the operation of the water treatment system with solar energy has been carried out using a typical meteorological year and the design of a static solar field that cover the thermal energy needs of the water treatment plant. The annual simulations of the MED pilot plant operating with solar energy showed that the water needs can be mostly covered using a static solar thermal field with a total area of 113.2 m 2 , which would generate roughly 46% of the total heat required by the water treatment plant. The technical analysis has been completed with an exhaustive economic assessment. The specific water costs have been determined for the MED pilot plant and the scale factor when the productivity is increased up to 5000 m 3 /day has been evaluated. The cost of distillated water produced by the MED plant varied from 15.0 USD$/m 3 for the 10 m 3 /day production capacity to 1.25 USD$/m 3 when this variable is increased to 5000 m 3 /day. Copyright © 2018 Elsevier B.V. All rights reserved.
Billore, S K; Sharma, J K; Singh, N; Ram, H
2013-01-01
In the last couple of decades constructed wetlands (CWs) have drawn considerable interest in Central India. CWs offer an effective means of integrating wastewater treatment and resource enhancement, often at competitive cost in comparison to conventional wastewater treatments, with additional benefits of Green Urban Landscaping and wildlife habitat. This paper describes treatment performances and the design of some Sub Surface Flow CWs (SSFCW) and Artificial Floating Islands (AFIs) in Central India. Central Indian CWs show significant pollution reduction load for total suspended solids (TSS) (62-82%), biochemical oxygen demand (BOD) (40-75%), NH(4)-N (67-78%) and total Kjeldahl nitrogen (TKN) (59-78%). Field scale SSFCWs installed so far in Central India are rectangular, earthen, single/multiple celled having similar depths of 0.60-0.90 m, hydraulic retention capacity 18-221 m(3) with effective size 41.8-1,050 m(2). The major components of CWs incorporate puddled bottom/side walls, sealed with impermeable low-density polyethylene, a bed of locally available river gravel planted with Phragmites karka, and an inlet distribution and outlet collection system. A new variant on CWs are AFIs working under hydroponics. The field scale experimental AFIs installed in-situ in a slowly flowing local river were composed of hollow bamboo, a bed of coconut coir, floating arrangements and Phragmites karka as nutrient stripping plant species. The AFIs polish the aquatic system by reducing 46.6% of TSS, 45-55% of NH(4)-N, 33-45% of NO(3)-N, 45-50% of TKN and 40-50% of BOD. The study established that there is a need for further research and sufficient data to assist the development of CWs by instilling confidence in policymakers, planners and in the public.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-06
... Request: The licensee proposes to upgrade and overhaul all six pump-turbine/motor generating units of the... increase the authorized installed and hydraulic capacities of the project from 1,657.5 MW to 1,785 MW and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-22
... Unit 3 of the project by rewinding the generator and replacing the turbine runner with a more efficient runner. The proposed upgrade would increase the installed and hydraulic capacities of the project by 5.7...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-30
..., containing two vertical Kaplan turbines with an authorized installed capacity of 81 megawatts (MW); (5) a 220... construct a 1.3-MW minimum flow turbine-generator at the project spillway. The offer of settlement involves...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-02
... turbine-generator units in the new powerhouse, (3) install a new 1,500 cubic foot per second (cfs) bypass... turbine-generator unit would have the same 1,500 cfs hydraulic capacity and the same 30 megawatts...
DOT National Transportation Integrated Search
2015-03-01
The enhancement of load rating concrete structures by the installation of Fiber reinforced : polymer strips (FRP) is becoming a preferred short-term action. The addition of supplemental : tensile capacity to concrete beams by applying high tensile st...
Configuration Management, Capacity Planning Decision Support, Modeling and Simulation
1988-12-01
flow includes both top-down and bottom-up requirements. The flow also includes hardware, software and transfer acquisition, installation, operation ... management and upgrade as required. Satisfaction of a users needs and requirements is a difficult and detailed process. The key assumptions at this
47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.
Code of Federal Regulations, 2012 CFR
2012-10-01
... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...
47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.
Code of Federal Regulations, 2013 CFR
2013-10-01
... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...
47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.
Code of Federal Regulations, 2011 CFR
2011-10-01
... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...
47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.
Code of Federal Regulations, 2010 CFR
2010-10-01
... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...
47 CFR 64.702 - Furnishing of enhanced services and customer-premises equipment.
Code of Federal Regulations, 2014 CFR
2014-10-01
... separate operating, marketing, installation, and maintenance personnel, and utilize separate computer... available to the separate corporation any capacity or computer system component on its computer system or... Enhanced Services and Customer-Premises Equipment by Bell Operating Companies; Telephone Operator Services...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-16
...) would consist of: (1) A 340-foot-long by 75-foot-wide powerhouse and inlet containing four Kaplan... powerhouse and inlet containing five Kaplan turbine-generators, with an installed capacity of 13.0 MW each...
Business developments of nonthermal solar technologies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, S.A.; Watts, R.L.; Williams, T.A.
1985-10-01
Information on the developments of nonthermal solar technologies is presented. The focus is on the success of wind energy conversion systems (WECS) and photovoltaics. Detailed information on the installed generating capacity, market sectors, financing sources, systems costs and warranties of WECS and photovoltaic systems is summarized. (BCS)
NASA Astrophysics Data System (ADS)
Redpath, David; Ward, Michael J.
2017-07-01
The maximum exploitable potential for low head hydroelectric sites (gross head≤10 m) in Northern Ireland (NI) was determined as 12.07 MW using a simple payback analysis for 304 potential sites investigated to derive a classification scheme in terms of economic viability. A techno-economic analysis with validated numerical models from previous research estimated the capital investment required for the development of a hydroelectric plant, using the low head Michell-Banki cross flow turbine, for the 304 sites investigated. The number of potentially viable sites in NI for low head hydro ranged from 198 to 286 with an estimated installed capacity ranging from 11.95 to 12.05 MW. Sites with a limited installed capacity were not economically viable unless increased government support in the form of longer term (25-50 years) low interest loans as well as the current (Renewables Obligations Certificates) Renewables Obligation Certificates scheme is provided and sustained.
Louwen, Atse; van Sark, Wilfried G J H M; Faaij, André P C; Schropp, Ruud E I
2016-12-06
Since the 1970s, installed solar photovoltaic capacity has grown tremendously to 230 gigawatt worldwide in 2015, with a growth rate between 1975 and 2015 of 45%. This rapid growth has led to concerns regarding the energy consumption and greenhouse gas emissions of photovoltaics production. We present a review of 40 years of photovoltaics development, analysing the development of energy demand and greenhouse gas emissions associated with photovoltaics production. Here we show strong downward trends of environmental impact of photovoltaics production, following the experience curve law. For every doubling of installed photovoltaic capacity, energy use decreases by 13 and 12% and greenhouse gas footprints by 17 and 24%, for poly- and monocrystalline based photovoltaic systems, respectively. As a result, we show a break-even between the cumulative disadvantages and benefits of photovoltaics, for both energy use and greenhouse gas emissions, occurs between 1997 and 2018, depending on photovoltaic performance and model uncertainties.
NAS technical summaries: Numerical aerodynamic simulation program, March 1991 - February 1992
NASA Technical Reports Server (NTRS)
1992-01-01
NASA created the Numerical Aerodynamic Simulation (NAS) Program in 1987 to focus resources on solving critical problems in aeroscience and related disciplines by utilizing the power of the most advanced supercomputers available. The NAS Program provides scientists with the necessary computing power to solve today's most demanding computational fluid dynamics problems and serves as a pathfinder in integrating leading-edge supercomputing technologies, thus benefiting other supercomputer centers in Government and industry. This report contains selected scientific results from the 1991-92 NAS Operational Year, March 4, 1991 to March 3, 1992, which is the fifth year of operation. During this year, the scientific community was given access to a Cray-2 and a Cray Y-MP. The Cray-2, the first generation supercomputer, has four processors, 256 megawords of central memory, and a total sustained speed of 250 million floating point operations per second. The Cray Y-MP, the second generation supercomputer, has eight processors and a total sustained speed of one billion floating point operations per second. Additional memory was installed this year, doubling capacity from 128 to 256 megawords of solid-state storage-device memory. Because of its higher performance, the Cray Y-MP delivered approximately 77 percent of the total number of supercomputer hours used during this year.
Hoppock, David C; Patiño-Echeverri, Dalia
2010-11-15
The best wind sites in the United States are often located far from electricity demand centers and lack transmission access. Local sites that have lower quality wind resources but do not require as much power transmission capacity are an alternative to distant wind resources. In this paper, we explore the trade-offs between developing new wind generation at local sites and installing wind farms at remote sites. We first examine the general relationship between the high capital costs required for local wind development and the relatively lower capital costs required to install a wind farm capable of generating the same electrical output at a remote site,with the results representing the maximum amount an investor should be willing to pay for transmission access. We suggest that this analysis can be used as a first step in comparing potential wind resources to meet a state renewable portfolio standard (RPS). To illustrate, we compare the cost of local wind (∼50 km from the load) to the cost of distant wind requiring new transmission (∼550-750 km from the load) to meet the Illinois RPS. We find that local, lower capacity factor wind sites are the lowest cost option for meeting the Illinois RPS if new long distance transmission is required to access distant, higher capacity factor wind resources. If higher capacity wind sites can be connected to the existing grid at minimal cost, in many cases they will have lower costs.
Marinucci, F; Medina-Moreno, S; Paterniti, A D; Wattleworth, M; Redfield, R R
2011-05-01
Improving access to CD4 testing in resource-limited settings can be achieved through both centralized and decentralized testing networks. Decentralized testing models are more suitable for countries where the HIV epidemic affects a large portion of rural populations. Timely access to accurate CD4 results is crucial at the primary level of the health system. For the past 7 years, the Institute of Human Virology of the University of Maryland School of Medicine has implemented a flexible and sustainable three-phase model: (1) site assessment and improvement, (2) appropriate technology selection with capacity building through practical training and laboratory mentoring, and (3) quality management system strengthening and monitoring, to support accessibility to reliable CD4 counting at the point of service. CD4 testing capacity was established in 122 of 229 (53%) laboratories supported in Nigeria, Uganda, Kenya, Zambia, Tanzania, and Rwanda. Among those in rural settings, 46% (69/151) had CD4 testing available at site level, with a functioning flow cytometer installed at 28% (8/29) and 50% (61/122) of level 1 and level 2 sites, respectively. To strengthen local capacity, a total of 1,152 laboratory technicians were trained through 188 training sessions provided both on-site and at central locations. The overall quality of CD4 total testing procedure was assessed at 76% (92/121) of the laboratories, with 25% (23/92), 34% (31/92), and 33% (30/92) of them reporting excellent, good, and satisfactory performance. Balancing country-specific factors with the location of the clinic, number of patients, and the expected workload, was crucial in adapting this flexible model for decentralizing CD4 testing. The close collaboration with local governments and private vendors was key to successfully expanding access to CD4 testing within the framework of HIV care and treatment programs and for the sustainability of medical laboratories in resource-limited settings. Copyright © 2011 International Society for Advancement of Cytometry.
NASA Technical Reports Server (NTRS)
Walker, William; Darst, John; Finegan, Donal; Bayles, Gary; Johnson, Kenneth; Darcy, Eric; Rickman, Steven
2018-01-01
Effective thermal management systems, designed to handle the impacts of thermal runaway (TR) and to prevent cell-to-cell propagation, are key to safe operation of lithium-ion (Li-ion) battery assemblies. Critical factors for optimizing these systems include the total energy released during a single cell TR event and the fraction of the total energy that is released through the cell casing vs. through the ejecta material. A unique calorimeter was utilized to examine the TR behavior of a statistically significant number of 18650-format Li-ion cells with varying manufacturers, chemistries, and capacities. The calorimeter was designed to contain the TR energy in a format conducive to discerning the fractions of energy released through the cell casing vs. through the ejecta material. Other benefits of this calorimeter included the ability to rapidly test of large quantities of cells and the intentional minimization of secondary combustion effects. High energy (270 Wh kg-1) and moderate energy (200 Wh kg-1) 18650 cells were tested. Some of the cells had an imbedded short circuit (ISC) device installed to aid in the examination of TR mechanisms under more realistic conditions. Other variations included cells with bottom vent (BV) features and cells with thin casings (0.22 l(1/4)m). After combining the data gathered with the calorimeter, a statistical approach was used to examine the probability of certain TR behavior, and the associated energy distributions, as a function of capacity, venting features, cell casing thickness and temperature.?
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This inventory of small industrial electric generating systems was assembled by The Aerospace Corporation to provide a data base for analyses being conducted to estimate the potential for displacement of these fossil-fueled systems by solar thermal electric systems no larger than 10 MW in rated capacity. The approximately 2100 megawatts generating capacity of systems in this category constitutes a potential market for small solar thermal and other solar electric power systems. The sources of data for this inventory were the (former) Federal Power Commission (FPC) Form 4 Industrial Ledger and Form 12-C Ledger for 1976. Table 1 alphabetically lists generatingmore » systems located at industrial plants and at Federal government installations in each of the 50 states. These systems are differentiated by type of power plant: steam turbine, diesel generator, or gas turbine. Each listing is designated as a power system rather than a power unit because the FPC Ledgers do not provide a means of determining whether more than one unit is associated with each industrial installation. Hence, the user should consider each listing to be a system capacity rating wherein the system may consist of one or more generating units with less than 10 MW/sub e/ combined rating. (WHK)« less
Development of a telemetry and yield-mapping system of olive harvester.
Castillo-Ruiz, Francisco J; Pérez-Ruiz, Manuel; Blanco-Roldán, Gregorio L; Gil-Ribes, Jesús A; Agüera, Juan
2015-02-10
Sensors, communication systems and geo-reference units are required to achieve an optimized management of agricultural inputs with respect to the economic and environmental aspects of olive groves. In this study, three commercial olive harvesters were tracked during two harvesting seasons in Spain and Chile using remote and autonomous equipment that was developed to determine their time efficiency and effective based on canopy shaking for fruit detachment. These harvesters work in intensive/high-density (HD) and super-high-density (SHD) olive orchards. A GNSS (Global Navigation Satellite System) and GSM (Global System for Mobile Communications) device was installed to track these harvesters. The GNSS receiver did not affect the driver's work schedule. Time elements methodology was adapted to the remote data acquisition system. The effective field capacity and field efficiency were investigated. In addition, the field shape, row length, angle between headland alley and row, and row alley width were measured to determinate the optimum orchard design parameters value. The SHD olive harvester showed significant lower effective field capacity values when alley width was less than 4 m. In addition, a yield monitor was developed and installed on a traditional olive harvester to obtain a yield map from the harvested area. The hedge straddle harvester stood out for its highly effective field capacity; nevertheless, a higher field efficiency was provided by a non-integral lateral canopy shaker. All of the measured orchard parameters have influenced machinery yields, whether effective field capacity or field efficiency. A saving of 40% in effective field capacity was achieved with a reduction from 4 m or higher to 3.5 m in alley width for SHD olive harvester. A yield map was plotted using data that were acquired by a yield monitor, reflecting the yield gradient in spite of the larger differences between tree yields.
Test results at transonic speeds on a contoured over-the-wing propfan model
NASA Technical Reports Server (NTRS)
Levin, Alan D.; Smeltzer, Donald B.; Smith, Ronald C.
1986-01-01
A semispan wing/body model with a powered highly loaded propeller has been tested to provide data on the propulsion installation drag of advanced propfan-powered aircraft. The model had a supercritical wing with a contoured over-the-wing nacelle. It was tested in the Ames Research Center's (ARC) 14-foot Transonic Wind Tunnel at a total pressure of 1 atm. The test was conducted at angles of attack from -0.5 to 4 deg at Mach numbers ranging from 0.6 to 0.8. The test objectives were to determine propeller performance, exhaust jet effects, propeller slipstream interference drag, and total powerplant installation drag. Test results indicated a total powerplant installation drag of 82 counts (0.0082) at a Mach number of 0.8 and a lift coefficient of 0.5, which is approximately 29 percent of a typical airplane cruise drag.
Analysis of Driven Pile Capacity within Pre-Bored Soil : Research Project Capsule
DOT National Transportation Integrated Search
2017-10-01
Pre-boring is a method used to facilitate large displacement pile driving in hard/dense soils (see Figure 1). By pre-boring a pilot hole, the end bearing and side friction within the pre-bored zone are reduced, thus aiding pile driving installation. ...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Filing. 24.1 Section 24.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF... initial and ultimate installed capacity of the project, the rated horsepower and head on the turbines, and...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Filing. 24.1 Section 24.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF... initial and ultimate installed capacity of the project, the rated horsepower and head on the turbines, and...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Filing. 24.1 Section 24.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF... initial and ultimate installed capacity of the project, the rated horsepower and head on the turbines, and...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-06
... installation of a pig launcher \\2\\, a pig receiver, and a mainline valve. According to Columbia, its project is... constructed parallel to an existing pipeline to increase capacity. \\2\\ A ``pig'' is a tool that the pipeline...
Colorado State University: A Midscale Market Solar Customer Case Study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holm, Alison; Chernyakhovskiy, Ilya
Despite substantial increases in solar photovoltaic (PV) deployment between 2005 and 2015, a large untapped market for solar PV deployment still exists in midscale market investments by universities. Recent estimates show that if all universities in the United States installed enough solar PV to meet 25% of their annual electricity consumption, this would cumulatively result in just over 16 gigawatts (GW) of additional installed PV capacity. Within this context, midscale market projects - loosely defined as solar PV installations ranging from 100 kilowatts (kW) to 2 megawatts (MW), but more broadly representing installations not captured in the residential or utility-scalemore » sectors - could be an attractive option for universities. This case study focuses on one university solar customer, Colorado State University (CSU), to provide a detailed example of the challenges, solutions, and opportunities associated with university solar power procurement. Between 2009 and 2015, a combined 6,754 kW of both ground-mounted and rooftop solar PV was installed across multiple CSU campuses in Fort Collins, Colorado. This case study highlights CSU's decision-making process, campus engagement strategies, and relationships with state, local, and utility partners, which have culminated in significant on-campus PV deployment.« less
Efficacy of a cell phone-based exercise programme for COPD.
Liu, W-T; Wang, C-H; Lin, H-C; Lin, S-M; Lee, K-Y; Lo, Y-L; Hung, S-H; Chang, Y-M; Chung, K F; Kuo, H-P
2008-09-01
The application of a supervised endurance exercise training programme in a home setting offering convenience and prolonged effects is a challenge. In total, 48 patients were initially assessed by the incremental shuttle walk test (ISWT), spirometry and the Short Form-12 (SF-12) quality-of-life questionnaire, and then every 4 weeks for 3 months thereafter and again after 1 yr. During the first 3 months, 24 patients in the cell phone group were asked to perform daily endurance walking at 80% of their maximal capacity by following the tempo of music from a program installed on a cell phone. The level of endurance walking at home was readjusted monthly according to the result of ISWT. In the control group, 24 patients received the same protocol and were verbally asked to take daily walking exercise at home. Patients in the cell phone group significantly improved their ISWT distance and duration of endurance walking after 8 weeks. The improvements in ISWT distance, inspiratory capacity and SF-12 scoring at 12 weeks persisted until the end of the study, with less acute exacerbations and hospitalisations. In the present pilot study, the cell phone-based system provides an efficient, home endurance exercise training programme with good compliance and clinical outcomes in patients with moderate-to-severe chronic obstructive pulmonary disease.
Rotaru, Iuliana; Bujoreanu, Carmen; Bele, Adrian; Cazacu, Maria; Olaru, Dumitru
2014-09-01
This research was focused on the damping capacity study of two types of silicone rubbers proposed as layers within total lumbar disc prostheses of ball-and-socket model. In order to investigate the damping capacity, the two silicone rubber types mainly differing by the molecular mass of polymeric matrix and the filler content, as was emphasized by scanning electron microscopy and differential scanning calorimetry, were subjected to free vibration testing. Using an adapted experimental installation, three kinds of damping testing were realised: tests without samples and tests with three samples of each type of silicone rubber (69 ShA and 99 ShA). The free vibration tests were performed at a frequency of about 6 Hz using a weight of 11.8 kg. The relative damping coefficient was determined by measuring of two successive amplitudes on the vibrogram and calculating of the logarithmic decrement. The test results with silicone rubber samples showed a relative damping coefficient of 0.058 and respectively 0.077, whilst test results without samples showed a relative damping coefficient of 0.042. These silicone rubbers were found to have acceptable damping properties to be used as layers placed inside the prosthetic components. Copyright © 2014 Elsevier B.V. All rights reserved.
An improved inventory of polychlorinated biphenyls in China: A case study on PCB-153
NASA Astrophysics Data System (ADS)
Xu, Yue; Tian, Chongguo; Wang, Xiaoping; Ma, Jianmin; Tang, Jianhui; Chen, Yingjun; Li, Jun; Zhang, Gan
2018-06-01
Emission inventory of pollutants is essential for the environmental fate study and management of the pollutant. To construct a reasonable PCB (polychlorinated biphenyls) inventory in China, this study estimates PCB usage and emission using power generating capacity, installed capacity of power plants and transformer substations, population density and GDP as surrogates. Inventory of representative PCB (PCB-153) with a resolution of 1/4° latitude × 1/4° longitude in China from 1952 to 2005 was generated and assessed as an example. Totally, about 20.3 kt PCBs were applied in China, of which 179 t were PCB-153. By the end of 2005, most of them (56.4%) were emitted into the soil, 2.7% entered the air, and about 20.8% was sealed in storage site or still in service. Historical emissions exhibited increasing trends after 1968, 1984 and 1994, which were mainly associated with usage or disposal processes. Although primary emission has been declined since 2005, the influence of secondary emission from soils, unintentionally produced PCBs (UP-PCB), and reemission from storage sites could be a long-lasting issue in the future. This new emission inventory improves previous PCB emission inventory significantly, which underestimated PCB emission in China considerably.
Experience from start-ups of the first ANITA Mox plants.
Christensson, M; Ekström, S; Andersson Chan, A; Le Vaillant, E; Lemaire, R
2013-01-01
ANITA™ Mox is a new one-stage deammonification Moving-Bed Biofilm Reactor (MBBR) developed for partial nitrification to nitrite and autotrophic N-removal from N-rich effluents. This deammonification process offers many advantages such as dramatically reduced oxygen requirements, no chemical oxygen demand requirement, lower sludge production, no pre-treatment or requirement of chemicals and thereby being an energy and cost efficient nitrogen removal process. An innovative seeding strategy, the 'BioFarm concept', has been developed in order to decrease the start-up time of new ANITA Mox installations. New ANITA Mox installations are started with typically 3-15% of the added carriers being from the 'BioFarm', with already established anammox biofilm, the rest being new carriers. The first ANITA Mox plant, started up in 2010 at Sjölunda wastewater treatment plant (WWTP) in Malmö, Sweden, proved this seeding concept, reaching an ammonium removal rate of 1.2 kgN/m³ d and approximately 90% ammonia removal within 4 months from start-up. This first ANITA Mox plant is also the BioFarm used for forthcoming installations. Typical features of this first installation were low energy consumption, 1.5 kW/NH4-N-removed, low N₂O emissions, <1% of the reduced nitrogen and a very stable and robust process towards variations in loads and process conditions. The second ANITA Mox plant, started up at Sundets WWTP in Växjö, Sweden, reached full capacity with more than 90% ammonia removal within 2 months from start-up. By applying a nitrogen loading strategy to the reactor that matches the capacity of the seeding carriers, more than 80% nitrogen removal could be obtained throughout the start-up period.
Zhao, Chunjian; Li, Chunying; Liu, Shuaihua; Yang, Lei
2014-01-01
Total polyphenol content, catechins content, and antioxidant capacities of green, dark, oolong, and black teas made from Camellia sinensis in China were evaluated. The total polyphenol content of 20 samples of tea was in the range of 7.82–32.36%. Total catechins content was in the range of 4.34–24.27%. The antioxidant capacity of tea extract was determined by the oxygen radical absorbance capacity (ORAC) test and the 1,1-diphenyl-2-picrylhydrazyl (DPPH) radical-scavenging test. Total polyphenol content, catechins content, and antioxidant capacity decreased in the following order: green > oolong > black > dark tea. A positive correlation existed between the antioxidant capacity and total polyphenol content or catechins content (R 2 = 0.67–0.87). The antioxidant capacities of five major catechins (epigallocatechin gallate (EGCG), epicatechin gallate (ECG), epicatechin, epigallocatechin, and catechin) were determined by online HPLC DPPH radical-scavenging; the antioxidant activity of tea was mainly attributed to the esterified catechins (EGCG or ECG). PMID:25243234
2013-05-15
rates, but conservatively, two weeks to several months), firm delivery contracts (which are based on the capacity of the transmission pipelines and...gas is not guaranteed as it is not part of the capacity planning process). 0 20 40 60 80 100 120 0 2 4 6 8 10 12 D ur at io n of st or ag e su pp...military installations. For example, Tinker AFB, Robins AFB, and MCAGCC Twentynine Palms all have natural gas-fired generation or cogeneration on site
California's geothermal resource potential
NASA Technical Reports Server (NTRS)
Leibowitz, L. P.
1978-01-01
According to a U.S. Geological Survey estimate, recoverable hydrothermal energy in California may amount to 19,000 MW of electric power for a 30-year period. At present, a geothermal installation in the Geysers region of the state provides 502 MWe of capacity; an additional 1500 MWe of electric generating capacity is scheduled to be in operation in geothermal fields by 1985. In addition to hydrothermal energy sources, hot-igneous and conduction-dominated resources are under investigation for possible development. Land-use conflicts, environmental concerns and lack of risk capital may limit this development.
The Tracking & Data Relay Satellite System. The New Space Network.
ERIC Educational Resources Information Center
Froehlich, Walter
This publication describes the giant-capacity space communications installation called the "Tracking and Data Relay Satellite System" (TDRSS). Chapters include: (1) "A New Communications Bridge to Orbit" (illustrating what it is and how it looks); (2) "TDRSS Goes to Work" (describing how it functions); (3) "The…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-02
... hydraulic head of 1,465 feet; (2) a proposed 50-ft zoned earth and rockfill lower dam with a 5,896-ft length... 150 MW and two 50 MW reversible pump/turbine generating units having an installed capacity of 250...
14 CFR 171.113 - Installation requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...
14 CFR 171.113 - Installation requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...
14 CFR 171.113 - Installation requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... facilities. (c) The facility must have a reliable source of suitable primary power, either from a power distribution system or locally generated. Also, adequate power capacity must be provided for operation of test... a facility will be required to have standby power for the SDF and monitor accessories to supplement...
49 CFR 179.102-4 - Vinyl fluoride, stabilized.
Code of Federal Regulations, 2010 CFR
2010-10-01
...) Include impact specimens of weld metal and heat affected zone prepared and tested in accordance with AAR.... (b) Insulation must be of approved material. (c) Excess flow valves must be installed under all... capacity stencil, MINIMUM OPERATING TEMPERATURE _ °F. (i) The tank car and insulation must be designed to...
Defense Coastal/Estuarine Research Program 2 (DCERP2)
2013-05-01
6 2.3 Adapting the Monitoring Plan...magnitude of storms). In addition, installation managers need to understand the trade-offs between carbon management and other adaptive management...respond to climate change to understand the resiliency and adaptive capacity of these ecosystems 2. Building on DCERP1 findings to identify
Security/Life Safety: A Need for Change.
ERIC Educational Resources Information Center
Ellsworth, Douglas
2003-01-01
In response to legislation, colleges and universities in several states must prepare to install sprinkler systems. Four basic issues an engineering study should examine include: whether the existing water service has the size, capacity, and pressure to support a sprinkler system; whether the protected facility will have to comply with more…
ERIC Educational Resources Information Center
Johnson, William C.; Ormond, Paul
2013-01-01
If properly installed, optimized geoexchange systems can be one of the most cost effective, powerful options to accomplish the goal of improved energy efficiency and reduced carbon emissions. Accurately quantifying field performance is an important step in designing a system that is the proper size and capacity. The authors share the real life…
46 CFR 129.440 - Emergency lighting.
Code of Federal Regulations, 2010 CFR
2010-10-01
... INSTALLATIONS Lighting Systems § 129.440 Emergency lighting. (a) A vessel of less than 100 gross tons must have... working (machinery) spaces below the main deck. (b) The emergency lighting required by paragraph (a) of... to an automatic battery-charger; and (4) Of enough capacity for 6 hours of continuous operation. ...
SDI increases water use efficiency of grain crops in the Southern High Plains
USDA-ARS?s Scientific Manuscript database
In the semi-arid Southern High Plains, nearly all irrigation water is derived from the declining High Plains (Ogallala) aquifer. As well capacities likewise decline, one tactic for continued irrigation is to install subsurface drip irrigation (SDI) systems with zones sized to accommodate the limited...
14 CFR 171.271 - Installation requirements.
Code of Federal Regulations, 2010 CFR
2010-01-01
... generated. Adequate power capacity must be provided for the operation of test and working equipment of the... restoration of power, the batteries must be restored to full charge within 24 hours. When primary power is... battery must permit continuation of normal operation for at least two hours under the normal operating...
18 CFR 11.1 - Costs of administration.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Costs of administration. 11.1 Section 11.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION..., authorized installed capacity means the lesser of the ratings of the generator or turbine units. The rating...
18 CFR 11.1 - Costs of administration.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Costs of administration. 11.1 Section 11.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION..., authorized installed capacity means the lesser of the ratings of the generator or turbine units. The rating...
18 CFR 11.1 - Costs of administration.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Costs of administration. 11.1 Section 11.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION..., authorized installed capacity means the lesser of the ratings of the generator or turbine units. The rating...
18 CFR 11.1 - Costs of administration.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Costs of administration. 11.1 Section 11.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION..., authorized installed capacity means the lesser of the ratings of the generator or turbine units. The rating...
18 CFR 11.1 - Costs of administration.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Costs of administration. 11.1 Section 11.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION..., authorized installed capacity means the lesser of the ratings of the generator or turbine units. The rating...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nelson, James; Mileva, Ana; Johnston, Josiah
2014-01-01
This study used a state-of-the-art planning model called SWITCH for the electric power system to investigate the evolution of the power systems of California and western North America from present-day to 2050 in the context of deep decarbonization of the economy. Researchers concluded that drastic power system carbon emission reductions were feasible by 2050 under a wide range of possible futures. The average cost of power in 2050 would range between $149 to $232 per megawatt hour across scenarios, a 21 to 88 percent increase relative to a business-as-usual scenario, and a 38 to 115 percent increase relative to themore » present-day cost of power. The power system would need to undergo sweeping change to rapidly decarbonize. Between present-day and 2030 the evolution of the Western Electricity Coordinating Council power system was dominated by implementing aggressive energy efficiency measures, installing renewable energy and gas-fired generation facilities and retiring coal-fired generation. Deploying wind, solar and geothermal power in the 2040 timeframe reduced power system emissions by displacing gas-fired generation. This trend continued for wind and solar in the 2050 timeframe but was accompanied by large amounts of new storage and long-distance high-voltage transmission capacity. Electricity storage was used primarily to move solar energy from the daytime into the night to charge electric vehicles and meet demand from electrified heating. Transmission capacity over the California border increased by 40 - 220 percent by 2050, implying that transmission siting, permitting, and regional cooperation will become increasingly important. California remained a net electricity importer in all scenarios investigated. Wind and solar power were key elements in power system decarbonization in 2050 if no new nuclear capacity was built. The amount of installed gas capacity remained relatively constant between present-day and 2050, although carbon capture and sequestration was installed on some gas plants by 2050.« less
Cost analysis of a coal-fired power plant using the NPV method
NASA Astrophysics Data System (ADS)
Kumar, Ravinder; Sharma, Avdhesh Kr.; Tewari, P. C.
2015-12-01
The present study investigates the impact of various factors affecting coal-fired power plant economics of 210 MW subcritical unit situated in north India for electricity generation. In this paper, the cost data of various units of thermal power plant in terms of power output capacity have been fitted using power law with the help of the data collected from a literature search. To have a realistic estimate of primary components or equipment, it is necessary to include the latest cost of these components. The cost analysis of the plant was carried out on the basis of total capital investment, operating cost and revenue. The total capital investment includes the total direct plant cost and total indirect plant cost. Total direct plant cost involves the cost of equipment (i.e. boiler, steam turbine, condenser, generator and auxiliary equipment including condensate extraction pump, feed water pump, etc.) and other costs associated with piping, electrical, civil works, direct installation cost, auxiliary services, instrumentation and controls, and site preparation. The total indirect plant cost includes the cost of engineering and set-up. The net present value method was adopted for the present study. The work presented in this paper is an endeavour to study the influence of some of the important parameters on the lifetime costs of a coal-fired power plant. For this purpose, parametric study with and without escalation rates for a period of 35 years plant life was evaluated. The results predicted that plant life, interest rate and the escalation rate were observed to be very sensitive on plant economics in comparison to other factors under study.
NASA Astrophysics Data System (ADS)
Francois, Baptiste; Creutin, Jean-Dominique
2016-04-01
Today, most of the produced energy is generated from fossil energy sources (i.e. coal, petroleum). As a result, the energy sector is still the main source of greenhouse gas in the atmosphere. For limiting greenhouse gas emission, a transition from fossil to renewable energy is required, increasing gradually the fraction energy coming from variable renewable energy (i.e. solar power, wind power and run-of-the river hydropower, hereafter denoted as VRE). VRE penetration, i.e. the percentage of demand satisfied by variable renewables assuming no storage capacity, is hampered by their variable and un-controllable features. Many studies show that combining different VRE over space smoothes their variability and increases their global penetration by a better match of demand fluctuations. When the demand is not fully supplied by the VRE generation, backup generation is required from stored energy (mostly from dams) or fossil sources, the latter being associated with high greenhouse gas emission. Thus the VRE penetration is a direct indicator of carbon savings and basically depends on the VRE installed capacity, its mix features, and on the installed storage capacity. In this study we analyze the European transition to a low carbon electricity system. Over a selection of representative regions we analyze carbon saving trajectories as functions of VRE production and storage capacities for different scenarios mixing one to three VRE with non-renewables. We show substantial differences between trajectories when the mix of sources is far from the local optimums, when the storage capacity evolves. We bring new elements of reflection about the effect of transport grid features from local independent systems to a European "copper plate". This work is part of the FP7 project COMPLEX (Knowledge based climate mitigation systems for a low carbon economy; Project FP7-ENV-2012 number: 308601; http://www.complex.ac.uk/).
The environmental impact of wind turbine blades
NASA Astrophysics Data System (ADS)
Liu, P.; Barlow, C. Y.
2016-07-01
The first generation of wind turbine (WT) blades are now reaching their end of life, signalling the beginning of a large problem for the future. Currently most waste is sent to landfill, which is not an environmentally desirable solution. Awareness of this issue is rising, but no studies have fully assessed the eco impact of WT blades. The present study aims to provide a macroscopic quantitative assessment of the lifetime environmental impact of WT blades. The first stage has been to analyse global data to calculate the amount of WT blade materials consumed in the past. The life cycle environmental impact of a single WT blade has then been estimated using eco data for raw materials, manufacturing processes, transportation, and operation and maintenance processes. For a typical 45.2 meter 1.5 MW blade this is 795 GJ (CO2 footprint 42.1 tonnes), dominated by manufacturing processes and raw materials (96% of the total. Based on the 2014 installed capacity, the total mass of WTB is 78 kt, their energy consumption is 82 TJ and the carbon dioxide footprint is 4.35 Mt. These figures will provide a basis for suggesting possible solutions to reduce WTB environmental impact.
Lazarou, Stavros; Vita, Vasiliki; Ekonomou, Lambros
2018-02-01
The data of this article represent a real electricity distribution network on twenty kilovolts (20 kV) at medium voltage level of the Hellenic electricity distribution system [1]. This network has been chosen as suitable for smart grid analysis. It demonstrates moderate penetration of renewable sources and it has capability in part of time for reverse power flows. It is suitable for studies of load aggregation, storage, demand response. It represents a rural line of fifty-five kilometres (55 km) total length, a typical length for this type. It serves forty-five (45) medium to low voltage transformers and twenty-four (24) connections to photovoltaic plants. The total installed load capacity is twelve mega-volt-ampere (12 MVA), however the maximum observed load is lower. The data are ready to perform load flow simulation on Matpower [2] for the maximum observed load power on the half production for renewables. The simulation results and processed data for creating the source code are also provided on the database available at http://dx.doi.org/10.7910/DVN/1I6MKU.
Installing Snowplow Cameras and Integrating Images into MnDOT's Traveler Information System
DOT National Transportation Integrated Search
2017-10-01
In 2015 and 2016, the Minnesota Department of Transportation (MnDOT) installed network video dash- and ceiling-mounted cameras on 226 snowplows, approximately one-quarter of MnDOT's total snowplow fleet. The cameras were integrated with the onboard m...
Antioxidant Capacities of Fractions of Bamboo Shaving Extract and Their Antioxidant Components.
Gong, Jinyan; Huang, Jun; Xiao, Gongnian; Chen, Feng; Lee, Bolim; Ge, Qing; You, Yuru; Liu, Shiwang; Zhang, Ying
2016-07-30
This research was conducted for evaluation of antioxidant activities of four fractions from bamboo shavings extract (BSE) and their antioxidant components. The antioxidant capacities of BSE and four fractions on ABTS, DPPH, FRAP and total antioxidant capacity assays exhibited the following descending order: DF > n-butanol fraction (BF) > BSE ≈ ethyl acetate fraction (AF) > water fraction (WF). Among the identified phenolic compounds, caffeic acid exhibited the highest antioxidant capacities on DPPH, FRAP and total antioxidant capacity assays. An extremely significant positive correlation between the antioxidant activities with the contents of total flavonoids, total phenolic acids, or total phenolics was observed in this study. The result indicated that the bamboo shaving extract and its solvent fractions could act as natural antioxidants in light of their potent antioxidant activities.
NASA Astrophysics Data System (ADS)
Keiser, Gerd; Liu, Hao-Yu; Lu, Shao-Hsi; Devi Pukhrambam, Puspa
2012-07-01
Low-cost multimode glass and plastic optical fibers are attractive for high-capacity indoor telecom networks. Many existing buildings already have glass multimode fibers installed for local area network applications. Future indoor applications will use combinations of glass multimode fibers with plastic optical fibers that have low losses in the 850-nm-1,310-nm range. This article examines real-world link losses when randomly interconnecting glass and plastic fiber segments having factory-installed connectors. Potential interconnection issues include large variations in connector losses among randomly selected fiber segments, asymmetric link losses in bidirectional links, and variations in bandwidths among different types of fibers.
51. (Credit JTL) Interior view (looking NW) of new pumping ...
51. (Credit JTL) Interior view (looking NW) of new pumping room built in 1921. In the right foreground is #1 low service pump built in 1897. Installed at McNeil in 1898, it was not moved during the building of this room in 1921. Beyond is a 5 mgd capacity Worthington-Snow cross-compound, duplex crank-and-fly-wheel engine built in 1920. Behind the worthington is an 8 mgd Allis-Chalmers engine of the same configuration. it was built in 1911, but not installed at McNeil until 1927. Both engines have condensers. - McNeil Street Pumping Station, McNeil Street & Cross Bayou, Shreveport, Caddo Parish, LA
NASA Astrophysics Data System (ADS)
Chemekov, V. V.; Kharchenko, V. V.
2013-03-01
Matters concerned with setting up environmentally clean supply of heat to dwelling houses in the resort zone of the Russian Black Sea coast on the basis of air-water type heat pumps powered from wind power installations are discussed. The investigations were carried out as applied to the system supplying heat for an individual dwelling house with an area of around 300 m2 situated in the Tuapse city. The design heat load of the building's heating system is around 8.3 kW. The Viessmann Vitocal 300 AW pump is chosen as the main source of heat supply, and a 4-kW electric heater built into a storage tank is chosen as a standby source. The selected wind power installation (the EuroWind 10 unit) has a power capacity of 13 kWe.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Friedman, B.; Margolis, R.; Seel, J.
Japan has re-emerged in 2013 as one of the world's fastest-growing and largest photovoltaic (PV) markets (Renewable Energy World 2013). Year-over-year growth in Japanese installed capacity in the first half of 2013 was about 270%. Japan's PV market was on pace to triple in 2013 compared with 2012, with approximately 2.7 GW installed during the first half of 2013 (compared to about 1.6 GW in the United States). This places Japan's market among the world's largest PV markets, along with China, Germany, and the United States. This report explores details of the rapidly changing Japanese market, and similarities and differencesmore » between the Japanese and U.S. markets. We collected data from a diverse group of Japanese PV installers, and we gathered additional Japanese and U.S. data from published sources as well as internal analyses.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lopez, F.C.; Sanz, A.T.
1959-01-01
In order to obtain deuterium for the feed of accelerator ion sources, a sample and automatic electrolytic installation was constructed. The installation, used with a small compressor, can fill pressure vessels of 1 to 2 liter capacity with deuterium up to a pressure of 4 atmospheres in a few hours of operation. The electrolytic cell has a "V" shape and can operate with only 3 cc of heavy water. The electrodes are platinum and NaOH solution in the proportion of 15 wt.% is the electrolyte. The operation is automatic. The compressor is small, and the charge is low so thatmore » an auxiliary motor is not needed. The compressor piston is the only moving part. Deuterium losses are practically zero. (auth)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
McKegg, A.
On February 6, 1987, Westinghouse Industry Services Queensland and Integrated Power Corporation (IPC) of Rockville, Maryland began their joint effort to design, build and install a hybrid photovoltaic/diesel power generation station. Installation began on June 1, 1987 and the system was operational on October 30, 1987. The system combines the quality, reliability and low operating costs of photovoltaics with the lower capital cost, high energy density and high efficiency at full load of diesel generators. The performance of the Coconut Island power system has been an unquestioned success. Power availability has exceeded 99 percent, a level comparable with local utilities.more » Energy capacity has not only met projections, but the system's flexibility has allowed energy output to be increased 40 percent beyond design level to accommodate the Islanders' enthusiastic demand for power. The power describes the design, performance, installation, and acceptance of the hybrid system. A table lists technical applications.« less
Vehicle Support Posts Installation at Mobile Launcher
2017-05-11
Construction workers at the Mobile Launcher at NASA's Kennedy Space Center in Florida, prepare to install vehicle support posts. A total of eight support posts are being installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
NASA Astrophysics Data System (ADS)
Hirahara, S.; Nakayama, T.; Hori, S.; Sato, T.; Chiba, Y.; Okada, T.; Matsuzawa, T.
2015-12-01
Soon after the 2011 Tohoku earthquake, seismic activity of Tohoku region, NE Japan is induced in the inland area of Akita prefecture and the border area between Fukushima and Yamagata prefectures. We plan to install a total of 80 offline seismic observation stations in these areas for studying the effect of megathrust earthquake on the activities of inland earthquakes. In our project, maintenance will be held twice-a-year for 4 years from 2015 by using 2.0Hz short-period 3-component seismometer, KVS-300 and ultra-low-power data logger, EDR-X7000 (DC12V 0.08W power supply). We installed seismometer on the rock surface or the slope of the natural ground at the possible sites confirmed with low noise level to obtain distinct seismic waveform data. We report an improvement in installation method of the offline seismic observation station in the heavy snowfall area of Tohoku region based on the retrieved data. In the conventional method, seismometer was installed in the hand-dug hole of a slope in case it is not waterproof. Data logger and battery were installed in the box container on the ground surface, and then, GPS antenna was installed on the pole fixed by stepladder. There are risks of the inclination of seismometer and the damage of equipment in heavy snowfall area. In the new method, seismometer is installed in the robust concrete box on the buried basement consists of precast concrete mass to keep its horizontality. Data logger, battery, and GPS antenna are installed on a high place by using a single pole with anchor bolt and a pole mount cabinet to enhance their safety. As a result, total costs of installation are kept down because most of the equipment is reusable. Furthermore, an environmental burden of waste products is reduced.
Noble, Adam; Roesner, Stefan
2016-01-01
Abstract Short and highly stereoselective total syntheses of the sesquilignan natural product tatanan A and its C3 epimer are described. An assembly‐line synthesis approach, using iterative lithiation–borylation reactions, was applied to install the three contiguous stereocenters with high enantio‐ and diastereoselectivity. One of the stereocenters was installed using a configurationally labile lithiated primary benzyl benzoate, resulting in high levels of substrate‐controlled (undesired) diastereoselectivity. However, reversal of selectivity was achieved by using a novel diastereoselective Matteson homologation. Stereospecific alkynylation of a hindered secondary benzylic boronic ester enabled completion of the synthesis in a total of eight steps. PMID:27865037
Storage capacity of the Fena Valley Reservoir, Guam, Mariana Islands, 2014
Marineau, Mathieu D.; Wright, Scott A.
2015-01-01
Analyses of the bathymetric data indicate that the reservoir currently has 6,915 acre-feet of storage capacity. The engineering drawings of record show that the total reservoir capacity in 1951 was estimated to be 8,365 acre-feet. Thus, between 1951 and 2014, the total storage capacity decreased by 1,450 acre-feet (a loss of 17 percent of the original total storage capacity). The remaining live-storage capacity, or the volume of storage above the lowest-level reservoir outlet elevation, was calculated to be 5,511 acre-feet in 2014, indicating a decrease of 372 acre-feet (or 6 percent) of the original 5,883 acre-feet of live-storage capacity. The remaining dead-storage capacity, or volume of storage below the lowest-level outlet, was 1,404 acre-feet in 2014, indicating a decrease of 1,078 acre-feet (or 43 percent) of the original 2,482 acre-feet of dead-storage capacity.
Factors influencing the measurement of closing volume.
Make, B; Lapp, N L
1975-06-01
The various factors influencing closing volume were studied by performing the single-breath N2 test on 9 healthy nonsmokers. Time of day, day of the week, and preceding volume history had no effect on either closing volume or alveolar plateau. Slow inspiratory flow resulted in larger ratio of closing volume to vital capacity, ratio of closing capacity to total lung capacity, and change in N2 concentration than fast inspiratory flow. Voluntary regulation of the expiratory flow resulted in smaller ratios of closing volume to vital capacity and closing capacity to total lung capacity than when flow was regulated by a resistance. Prolonged breath holding of the inspired O2 led to larger ratio of closing volume to vital capacity and ratio of closing capacity to total lung capacity. To obtain uniform, comparable closing volumes, it is suggested that the subject inspire slowly, control expiratory flow (preferably voluntarily), and not pause between inspiration and expiration.
Total antioxidant capacity of the Korean diet
Han, Jeong-Hwa; Lee, Hye-Jin; Cho, Mi Ran; Chang, Namsoo; Kim, Yuri; Oh, Se-Young
2014-01-01
BACKGROUND/OBJECTIVES The objective of this study was to measure and/or estimate the total antioxidant capacity of the Korean diet. MATERIALS/METHODS Eighty-one plant foods that were expected to exhibit rather high antioxidant activities were selected from the Korean diet using the Fifth Korean National Health and Nutrition Survey (KNHANES V). These foods were categorized into 11 food groups: cereals, potatoes, legumes, nuts, vegetables, kimchies, mushrooms, fruits, fruit juices, sea weeds, and oils. The foods were mixed in the proportions specified in traditional Korean recipes and analyzed. The measured indicators for antioxidant capacities were total phenolics, 2,2-diphenyl-1-picrylhydrazyl (DPPH), oxygen radical absorbance capacity (ORAC), and Trolox equivalent antioxidant capacity (TEAC). RESULTS Total phenolics were high in the fruit juices, nuts, vegetables, and fruits; and the average DPPH, ORAC, and TEAC values were high in the vegetables, fruits, fruit juices, and nuts. The correlation coefficient between the content of total phenolics of each food and the in vitro antioxidant capacity was relatively high at 0.851. The intake of total phenolics per capita per day in the Republic of Korea was estimated to be 127 mg. The total dietary antioxidant capacity (TDAC) values, which were obtained from the total antioxidant capacity of each food, taking into account the intake of each food, were 20,763, 54,335, and 876.4 µmol of Trolox equivalents using the DPPH, ORAC, and TEAC methods, respectively. The food group that contributed the most to the Korean TDAC was cereals at 39.7%, followed by fruits and vegetables at 27.8% and 13.9%, respectively. The contribution of legumes, nuts, fruit juices, and mushrooms was quite minimal at less than 2% each. CONCLUSIONS The content of total phenolics and the antioxidant capacity of the Korean diet are significantly correlated and the high contributing food groups are cereals, fruits, and vegetables. PMID:24741403
30 CFR 77.506 - Electric equipment and circuits; overload and short-circuit protection.
Code of Federal Regulations, 2010 CFR
2010-07-01
... short-circuit protection. 77.506 Section 77.506 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... circuits; overload and short-circuit protection. Automatic circuit-breaking devices or fuses of the correct type and capacity shall be installed so as to protect all electric equipment and circuits against short...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-13
... applicant proposes to install two crossflow turbines at the project rather than two double suction pump turbines as previously envisioned. The applicant also proposes to modify project operation by running the... proposed amendment would not change the project's hydraulic capacity or possible electrical output but...
46 CFR 182.320 - Water heaters.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 7 2010-10-01 2010-10-01 false Water heaters. 182.320 Section 182.320 Shipping COAST...) MACHINERY INSTALLATION Auxiliary Machinery § 182.320 Water heaters. (a) A water heater must meet the...), except that an electric water heater is also acceptable if it: (1) Has a capacity of not more than 454...
46 CFR 182.320 - Water heaters.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 7 2011-10-01 2011-10-01 false Water heaters. 182.320 Section 182.320 Shipping COAST...) MACHINERY INSTALLATION Auxiliary Machinery § 182.320 Water heaters. (a) A water heater must meet the...), except that an electric water heater is also acceptable if it: (1) Has a capacity of not more than 454...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-21
..., and regulatory interpretations, and posts them on the ADI on a quarterly basis. In addition, the ADI... NSPS A, AAa Installation of a Capacitor Bank and Tuned Reactor 1000019 NSPS AAAA Conversion of Post... WWW Amended Design Capacity Reports A100001 Asbestos M Removal of Asbestos Containing Coating...
30 CFR 18.50 - Protection against external arcs and sparks.
Code of Federal Regulations, 2014 CFR
2014-07-01
... volts. (c) A device(s) such as a diode(s) of adequate peak inverse voltage rating and current-carrying capacity to conduct possible fault current through the grounded power conductor. Diode installations shall include: (1) An overcurrent device in series with the diode, the contacts of which are in the machine's...
30 CFR 18.50 - Protection against external arcs and sparks.
Code of Federal Regulations, 2013 CFR
2013-07-01
... volts. (c) A device(s) such as a diode(s) of adequate peak inverse voltage rating and current-carrying capacity to conduct possible fault current through the grounded power conductor. Diode installations shall include: (1) An overcurrent device in series with the diode, the contacts of which are in the machine's...
30 CFR 18.50 - Protection against external arcs and sparks.
Code of Federal Regulations, 2012 CFR
2012-07-01
... volts. (c) A device(s) such as a diode(s) of adequate peak inverse voltage rating and current-carrying capacity to conduct possible fault current through the grounded power conductor. Diode installations shall include: (1) An overcurrent device in series with the diode, the contacts of which are in the machine's...
78 FR 73239 - Small Generator Interconnection Agreements and Procedures
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-05
... distributed resources.\\35\\ Public Interest Organizations go on to state that: \\29\\ See, e.g., American Wind... Society and Wind on the Wires are referred to collectively as Public Interest Organizations in this Final...\\ Similarly, installed wind generation with a capacity of 20 MW or less has increased in the contiguous United...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-16
... currently approved for installation in transport-category airplanes. Large, high-capacity, rechargeable... electrolytes. The electrolyte can serve as a source of fuel for an external fire if the cell container is..., are established to ensure the availability of electrical power from the batteries when needed...
Solar heating for a restaurant--North Little Rock, Arkansas
NASA Technical Reports Server (NTRS)
1981-01-01
Hot water consumption of large building affects solar-energy system design. Continual demand for hot water at restaurant makes storage less important than at other sites. Storage capacity of system installed in December 1979 equals estimated daily hot-water requirement. Report describes equipment specifications and modifications to existing building heating and hot water systems.
46 CFR 182.320 - Water heaters.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 7 2012-10-01 2012-10-01 false Water heaters. 182.320 Section 182.320 Shipping COAST...) MACHINERY INSTALLATION Auxiliary Machinery § 182.320 Water heaters. (a) A water heater must meet the...), except that an electric water heater is also acceptable if it: (1) Has a capacity of not more than 454...
46 CFR 182.320 - Water heaters.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 7 2013-10-01 2013-10-01 false Water heaters. 182.320 Section 182.320 Shipping COAST...) MACHINERY INSTALLATION Auxiliary Machinery § 182.320 Water heaters. (a) A water heater must meet the...), except that an electric water heater is also acceptable if it: (1) Has a capacity of not more than 454...
46 CFR 182.320 - Water heaters.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 7 2014-10-01 2014-10-01 false Water heaters. 182.320 Section 182.320 Shipping COAST...) MACHINERY INSTALLATION Auxiliary Machinery § 182.320 Water heaters. (a) A water heater must meet the...), except that an electric water heater is also acceptable if it: (1) Has a capacity of not more than 454...
18 CFR 16.6 - Notification procedures under section 15 of the Federal Power Act.
Code of Federal Regulations, 2012 CFR
2012-04-01
... filing procedures posted on the Commission's Web site at http://www.ferc.gov a letter, that contains the following information: (1) The licensee's name and address. (2) The project number. (3) The license... installed plant capacity. (9) The location or locations of all the sites where the information required...
18 CFR 16.6 - Notification procedures under section 15 of the Federal Power Act.
Code of Federal Regulations, 2011 CFR
2011-04-01
... filing procedures posted on the Commission's Web site at http://www.ferc.gov a letter, that contains the following information: (1) The licensee's name and address. (2) The project number. (3) The license... installed plant capacity. (9) The location or locations of all the sites where the information required...
18 CFR 16.6 - Notification procedures under section 15 of the Federal Power Act.
Code of Federal Regulations, 2013 CFR
2013-04-01
... filing procedures posted on the Commission's Web site at http://www.ferc.gov a letter, that contains the following information: (1) The licensee's name and address. (2) The project number. (3) The license... installed plant capacity. (9) The location or locations of all the sites where the information required...
USDA-ARS?s Scientific Manuscript database
Forty-five flood control reservoirs, authorized in the United States Flood Control Act of 1936, were installed between 1969 and 1982 in the Little Washita River Experimental Watershed (LWREW), located in central Oklahoma. Over time, these reservoirs have lost water storage capacity due to sedimentat...
32 CFR 552.60 - Supervision of on-post commercial activities.
Code of Federal Regulations, 2010 CFR
2010-07-01
... designated areas. (2) DOD personnel will not act in any official or business capacity, either directly or... training, and within the first half of the one station unit training cycle. (2) Solicitation of “mass... activities conducted on the installation. (e) Business reply system. Agents who desire to use a business...
33 CFR 159.57 - Installation, operation, and maintenance instructions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... complete parts list. (5) A schematic diagram showing the relative location of each part. (6) A wiring diagram. (7) A description of the service that may be performed by the user without coming into contact with sewage or chemicals. (8) Average and peak capacity of the device for the flow rate, volume, or...
33 CFR 159.57 - Installation, operation, and maintenance instructions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... complete parts list. (5) A schematic diagram showing the relative location of each part. (6) A wiring diagram. (7) A description of the service that may be performed by the user without coming into contact with sewage or chemicals. (8) Average and peak capacity of the device for the flow rate, volume, or...
33 CFR 159.57 - Installation, operation, and maintenance instructions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... complete parts list. (5) A schematic diagram showing the relative location of each part. (6) A wiring diagram. (7) A description of the service that may be performed by the user without coming into contact with sewage or chemicals. (8) Average and peak capacity of the device for the flow rate, volume, or...
40 CFR 1065.110 - Work inputs and outputs, accessory work, and operator demand.
Code of Federal Regulations, 2013 CFR
2013-07-01
...-current and water-brake dynamometers for any testing that does not involve engine motoring, which is... resistor load bank to simulate electrical loads. (3) Pump, compressor, and turbine work. Use pumps, compressors, and turbines that are of the type and capacity installed in use. Use working fluids that are of...
40 CFR 1065.110 - Work inputs and outputs, accessory work, and operator demand.
Code of Federal Regulations, 2014 CFR
2014-07-01
...-current and water-brake dynamometers for any testing that does not involve engine motoring, which is... resistor load bank to simulate electrical loads. (3) Pump, compressor, and turbine work. Use pumps, compressors, and turbines that are of the type and capacity installed in use. Use working fluids that are of...
40 CFR 1065.110 - Work inputs and outputs, accessory work, and operator demand.
Code of Federal Regulations, 2012 CFR
2012-07-01
...-current and water-brake dynamometers for any testing that does not involve engine motoring, which is... resistor load bank to simulate electrical loads. (3) Pump, compressor, and turbine work. Use pumps, compressors, and turbines that are of the type and capacity installed in use. Use working fluids that are of...
40 CFR 1065.110 - Work inputs and outputs, accessory work, and operator demand.
Code of Federal Regulations, 2011 CFR
2011-07-01
...-current and water-brake dynamometers for any testing that does not involve engine motoring, which is... resistor load bank to simulate electrical loads. (3) Pump, compressor, and turbine work. Use pumps, compressors, and turbines that are of the type and capacity installed in use. Use working fluids that are of...
40 CFR 1065.110 - Work inputs and outputs, accessory work, and operator demand.
Code of Federal Regulations, 2010 CFR
2010-07-01
...-current and water-brake dynamometers for any testing that does not involve engine motoring, which is... resistor load bank to simulate electrical loads. (3) Pump, compressor, and turbine work. Use pumps, compressors, and turbines that are of the type and capacity installed in use. Use working fluids that are of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-12
... physical changes to the existing cement infrastructure; (2) one reverse-pump turbine generator unit with a rated capacity of 325 kW; (3) the turbine generator unit to be installed within the pipeline using... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13802-000] California Water...
The SunShot Initiative’s 2030 Goal: 3¢ per Kilowatt Hour for Solar Electricity
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
In 2011, when solar power comprised less than 0.1% of the U.S. electricity supply, the U.S. Department of Energy (DOE) launched the SunShot Initiative with the goal of making solar electricity cost-competitive with traditionally generated electricity by 2020 without subsidies. At the time, this meant reducing photovoltaic (PV) and concentrating solar power (CSP) prices by approximately 75% across the residential, commercial, and utility-scale sectors. For utility-scale solar, this target is a levelized cost of energy (LCOE) of 6¢ per kilowatt hour (kWh)1. Rapid progress has been made in accelerating achievement of these cost reductions, and DOE’s Solar Energy Technologies Officemore » (SETO) sees clear pathways to meeting the SunShot 2020 cost targets on schedule.2 Enabled by the cost reductions to date, solar-generated electricity has become mainstream. In 2014 and 2015, solar represented about one-third of new electrical generating capacity installed in the United States Halfway through 2016, solar was supplying 1% of U.S. electricity demand and growing with an installed capacity of 30 gigawatts.« less
District heating systems in Oradea, Romania
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lund, J.W.
1997-08-01
Oradea is located on the Crisul Repede River, in the northwestern corner of Romania almost due west of Budapest, Hungary. The city has a population around half a million people and can trace its origins back to the Neolithic Age. It was an urban settlement beginning in the 13th century and has been an economic and cultural center for the region. It is a geothermal city with 12 wells drilled within the city limits, six in the nearby Felix Spa and five in the Bors geothermal area to the west, with one doublet set at Nufarul. Currently, there are amore » variety of geothermal uses in the area, including space and greenhouse heating, domestic hot water supply, process heat, balneology and swimming pools. Wellhead temperatures range from 70 to 105{degrees}C with artesian flows of from 5 to 25 L/s. The present installed capacity is 25 MWt and the heat supply is estimated at 60,000 MWh per year (216,000 GJ/yr). With pumping, the production would double and adding four more doublets, the installed capacity be increased to 65 MWt.« less
NASA Astrophysics Data System (ADS)
Hiratsuka, Y.; Bao, Q.; Y Xu, M.
2017-12-01
Since 2012, a new, compact Gifford-McMahon (GM) cryocooler for cooling superconducting single photon detectors (SSPD) has been developed and reported by Sumitomo Heavy Industries, Ltd. (SHI). Also, it was reported that National Institute of Information and Communications Technology (NICT) developed a multi-channel, conduction-cooled SSPD system. However, the size and power consumption reduction becomes indispensable to apply such a system to the optical communication of AdHoc for a mobile system installed in a vehicle. The objective is to reduce the total height of the expander by 33% relative to the existing RDK-101 GM expander and to reduce the total volume of the compressor unit by 50% relative to the existing CNA-11 compressor. In addition, considering the targeted cooling application, we set the design cooling capacity targets of the first and the second stages 1 W at 60 K and 20 mW at 2.3 K respectively. In 2016, Hiratsuka et al. reported that an oil-free compressor was developed for a 2K GM cryocooler. The cooling performance of a 2K GM expander driven by an experimental unit of the linear compressor was measured. No-load temperature less than 2.1 K and the cooling capacity of 20 mW at 2.3 K were successfully achieved with an electric input power of only 1.1 kW. After that, the compressor capsule and the heat exchanger, etc. were assembled into one enclosure as a compressor unit. The total volume of the compressor unit and electrical box was significantly reduced to about 38 L, which was close to the target of 35 L. Also, the sound noise, vibration characteristics, the effect of the compressor unit inclination and the ambient temperature on the cooling performance, were evaluated. The detailed experimental results are discussed in this paper.
Automated System Marketplace 1988: Focused on Fulfilling Commitments.
ERIC Educational Resources Information Center
Walton, Robert A.; Bridge, Frank R.
1989-01-01
Analyzes trends in the library automation marketplace. Market shares for online vendors are examined in terms of total installations, academic libraries, public libraries, revenues, differently sized systems, and foreign installations. Hardware availability, operating systems, and interfaces with MARC are also discussed for each vendor. A source…
40 CFR 610.23 - Operator interaction effects.
Code of Federal Regulations, 2010 CFR
2010-07-01
... degree of sensitivity of device effectiveness to variances in installation, operation and maintenance; (b..., operation and maintenance; (c) The extent to which device installation or use, or the effects of such... between total cost of ownership of the device (purchase price plus maintenance costs) and the cost savings...
Residential solar-heating system
NASA Technical Reports Server (NTRS)
1978-01-01
Complete residential solar-heating and hot-water system, when installed in highly-insulated energy-saver home, can supply large percentage of total energy demand for space heating and domestic hot water. System which uses water-heating energy storage can be scaled to meet requirements of building in which it is installed.
Sari, Fatma Nur; Akdag, Arzu; Dizdar, Evrim Alyamac; Uras, Nurdan; Erdeve, Omer; Erel, Ozcan; Dilmen, Ugur
2012-06-01
To determine total antioxidant capacity and total oxidation status in fresh and freeze stored (at -80°C) breast milk during the stages of lactation. Samples of colostrum, transitional and mature milk were collected from 44 healthy women at 3, 8 and 30 days after birth. The total milk volume collected (6 ml) was divided in two aliquot parts: 3 ml for the fresh analysis which was done immediately after the extraction and 3 ml for storage under freezing conditions at -80°C for two months. The antioxidant status and oxidative stress of the fresh and stored breast milk were assessed via determination of total antioxidant capacity and total oxidation status. Antioxidant capacity of transitional and mature milk decreased (p = 0.0001, p = 0.028, respectively); however, antioxidant capacity of colostrum did not change by storage at -80°C (p > 0.05). Total antioxidant capacity of fresh and stored breast milk significantly decreased during the stages of lactation (p < 0.0001, p = 0.028, respectively). Total oxidation status showed no significant difference in fresh and stored breast milk during the stages of lactation (p > 0.05). Freeze storage of breast milk at -80°C for two months seems not to be the optimal condition to preserve the antioxidant capacity of breast milk.
Solar hot water system installed at Las Vegas, Nevada
NASA Technical Reports Server (NTRS)
1981-01-01
A solar energy hot water system installed in a motor inn at Las Vegas, Nevada is described. The inn is a three story building with a flat roof for installation of the solar panels. The system consists of 1,200 square feet of liquid flat plate collectors, a 2,500 gallon insulated vertical steel storage tank, two heat exchangers, and pumps and controls. The system was designed to supply approximately 74 percent of the total hot water load.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Balser, S.; Sankar, S.; Miller, R.
In order to more fully integrate renewable resources, such as wind and solar, into the transmission system, additional capacity must be realized in the short term using the installed transmission capacity that exists today. The U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory Transmission and Grid Integration Group supported this study to assemble the history of regulations and status of transmission technology to expand existing grid capacity. This report compiles data on various transmission technology methods and upgrades for increased capacity utilization of the existing transmission system and transmission corridors. The report discusses the technical merit ofmore » each method and explains how the method could be applied within the current regulatory structure to increase existing transmission conductor and/or corridor capacity. The history and current state of alternatives to new construction is presented for regulators, legislators, and other policy makers wrestling with issues surrounding integration of variable generation. Current regulations are assessed for opportunities to change them to promote grid expansion. To support consideration of these alternatives for expanding grid capacity, the report lists relevant rules, standards, and policy changes.« less
2013 Wind Technologies Market Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wiser, R.; Bolinger, M.; Barbose, G.
2014-08-01
This annual report provides a detailed overview of developments and trends in the U.S. wind power market, with a particular focus on 2013. This 2013 edition updates data presented in previous editions while highlighting key trends and important new developments. The report includes an overview of key installation-related trends; trends in wind power capacity growth; how that growth compares to other countries and generation sources; the amount and percentage of wind energy in individual states; the status of offshore wind power development and the quantity of proposed wind power capacity in various interconnection queues in the United States.
Environmental impact of coal industry and thermal power plants in India.
Mishra, U C
2004-01-01
Coal is the only natural resource and fossil fuel available in abundance in India. Consequently, it is used widely as a thermal energy source and also as fuel for thermal power plants producing electricity. India has about 90,000 MW installed capacity for electricity generation, of which more than 70% is produced by coal-based thermal power plants. Hydro-electricity contributes about 25%, and the remaining is mostly from nuclear power plants (NPPs). The problems associated with the use of coal are low calorific value and very high ash content. The ash content is as high as 55-60%, with an average value of about 35-40%. Further, most of the coal is located in the eastern parts of the country and requires transportation over long distances, mostly by trains, which run on diesel. About 70% oil is imported and is a big drain on India's hard currency. In the foreseeable future, there is no other option likely to be available, as the nuclear power programme envisages installing 20,000 MWe by the year 2020, when it will still be around 5% of the installed capacity. Hence, attempts are being made to reduce the adverse environmental and ecological impact of coal-fired power plants. The installed electricity generating capacity has to increase very rapidly (at present around 8-10% per annum), as India has one of the lowest per capita electricity consumptions. Therefore, the problems for the future are formidable from ecological, radio-ecological and pollution viewpoints. A similar situation exists in many developing countries of the region, including the People's Republic of China, where coal is used extensively. The paper highlights some of these problems with the data generated in the author's laboratory and gives a brief description of the solutions being attempted. The extent of global warming in this century will be determined by how developing countries like India manage their energy generation plans. Some of the recommendations have been implemented for new plants, and the situation in the new plants is much better. A few coal washeries have also been established. It will be quite some time before the steps to improve the environmental releases are implemented in older plants and several coal mines due to resource constraints.
Small-scale Geothermal Power Plants Using Hot Spring Water
NASA Astrophysics Data System (ADS)
Tosha, T.; Osato, K.; Kiuchi, T.; Miida, H.; Okumura, T.; Nakashima, H.
2013-12-01
The installed capacity of the geothermal power plants has been summed up to be about 515MW in Japan. However, the electricity generated by the geothermal resources only contributes to 0.2% of the whole electricity supply. After the catastrophic earthquake and tsunami devastated the Pacific coast of north-eastern Japan on Friday, March 11, 2011, the Japanese government is encouraging the increase of the renewable energy supply including the geothermal. It needs, however, more than 10 years to construct the geothermal power plant with more than 10MW capacity since the commencement of the development. Adding the problem of the long lead time, high temperature fluid is mainly observed in the national parks and the high quality of the geothermal resources is limited. On the other hand hot springs are often found. The utilisation of the low temperature hot water becomes worthy of notice. The low temperature hot water is traditionally used for bathing and there are many hot springs in Japan. Some of the springs have enough temperature and enthalpy to turn the geothermal turbine but a new technology of the binary power generation makes the lower temp fluid to generate electricity. Large power generators with the binary technology are already installed in many geothermal fields in the world. In the recent days small-scale geothermal binary generators with several tens to hundreds kW capacity are developed, which are originally used by the waste heat energy in an iron factory and so on. The newly developed binary unit is compact suitable for the installation in a Japanese inn but there are the restrictions for the temperature of the hot water and the working fluid. The binary power unit using alternatives for chlorofluorocarbon as the working fluid is relatively free from the restriction. KOBELCO, a company of the Kobe Steel Group, designed and developed the binary power unit with an alternative for chlorofluorocarbon. The unit has a 70 MW class electric generator. Three units have been installed in Obama Hot Spring area, Nagasaki Prefecture, where about 15,000 tonnes of hot water are produced in a day and more than 35% of the hot water flow directly to the sea. Another demonstration experiments are also conducted in several hot spring areas. In this study we will review several examples to utilise low temperature hot springs in Japan. Binary Power Unit at Obama (Fujino, 2013)
Kilburn, K H
2000-01-01
In this study, the author addressed the following question: Do workers with advanced asbestosis have a restrictive pulmonary physiology, and, alternately, do those who have restrictive physiological tests have advanced asbestosis? One group was identified by obvious radiographic measurements, and the other group was defined via physiologic measurements. Total lung capacity, vital capacity, and flows were measured in 12,856 men exposed to asbestos, of whom 3,445 had radiographic signs of asbestosis, as defined by the International Labour Office criteria. Radiographically advanced asbestosis-International Labour Office criteria profusion greater than 2/2 was present in 85 (2.5%) of men. An additional 52 men had physiologically restrictive disease. The author, who compared pulmonary flows and volumes of these two groups, used mean percentage predicted, adjusted for height, age, and duration of cigarette smoking. Men with radiographically advanced asbestosis had normal total lung capacity (i.e., 105.5% predicted), reduced forced vital capacities (i.e., 82.7% predicted), air trapping (i.e., residual volume/total lung capacity increased to 54.4%), and reduced flows (i.e., forced expiratory flow [FEF25-75] = 60.6% predicted, forced expiratory volume in 1 s = 78.0% predicted, and forced expiratory volume in 1 s/forced vital capacity = 65.5%). In contrast, men selected from the same exposed population for restrictive disease (i.e., reduced total lung capacity [72.6% predicted] and forced vital capacity [61.5% predicted]) also had airflow obstruction (i.e., forced expiratory volume in 1 s/forced vital capacity of 74.5% predicted) and air trapping (i.e., residual volume/total lung capacity of 46.7%). Only half of these men had asbestosis--and it was of minimal severity. In summary, advanced asbestosis was characterized by airway obstruction and air trapping, both of which reduced vital capacity but not total lung capacity; therefore, it was not a restrictive disease. In contrast, restrictive disease was rare and was associated with minimal asbestosis.
Application of LEED (trademark) and SPiRiT to a Proposed Building Design
2003-03-01
TOTAL AREA S CAT ARLOC INSTALLATION NO CODE C QTY UM OCPD F CODE 1) 24004 Aberdeen Provi E1890...ARLOC INSTALLATION NO CODE C QTY UM OCPD F CODE 1) 24004 Aberdeen Provi E3832 31010 P 13,000 SF 13,000 R
Total brain death: a reply to Alan Shewmon.
Lee, Patrick; GriseZ, Germain
2012-06-01
D. Alan Shewmon has advanced a well-documented challenge to the widely accepted total brain death criterion for death of the human being. We show that Shewmon’s argument against this criterion is unsound, though he does refute the standard argument for that criterion. We advance a distinct argument for the total brain death criterion and answer likely objections. Since human beings are rational animals--sentient organisms of a specific type--the loss of the radical capacity for sentience (the capacity to sense or to develop the capacity to sense) involves a substantial change, the passing away of the human organism. In human beings total brain death involves the complete loss of the radical capacity for sentience, and so in human beings total brain death is death.
An accurate and rapid radiographic method of determining total lung capacity
Reger, R. B.; Young, A.; Morgan, W. K. C.
1972-01-01
The accuracy and reliability of Barnhard's radiographic method of determining total lung capacity have been confirmed by several groups of investigators. Despite its simplicity and general reliability, it has several shortcomings, especially when used in large-scale epidemiological surveys. Of these, the most serious is related to film technique; thus, when the cardiac and diaphragmatic shadows are poorly defined, the appropriate measurements cannot be made accurately. A further drawback involves the time needed to measure the segments and to perform the necessary calculations. We therefore set out to develop an abbreviated and simpler radiographic method for determining total lung capacity. This uses a step-wise multiple regression model which allows total lung capacity to be derived as follows: posteroanterior and lateral films are divided into the standard sections as described in the text, the width, depth, and height of sections 1 and 4 are measured in centimetres, finally the necessary derivations and substitutions are made and applied to the formula Ŷ = −1·41148 + (0·00479 X1) + (0·00097 X4), where Ŷ is the total lung capacity. In our hands this method has provided a simple, rapid, and acceptable method of determining total lung capacity. PMID:5034594
Atlas/Data Abstract for the United States and Selected Areas: Fiscal Year 1991
1991-01-01
Massachusetts (MA) 22 60 Michigan (MI) 23 62 Minnesota (MN) 24 64 Mississippi (MS) 25 66 Missouri (MO) 26 68 Montana (MT) 27 70 Nebraska (NE) 28 72...total awards over $25,000) Prepared by: Uashig.-xton Headquarters Services Directorate for inforration Operations and Reports 63 MAP NO. 24 MINNESOTA n...ARMY INSTALLATION I • NAVY INSTALLATION]q •AF INSTALLATION * TACONITE DULUTH *LITTLE FALLS PLYMOUTH ROSEVILLE BROOKLYN PA I I NEW BRIGHTO F R I DLEY
Solar energy retrofit for Clarksville Middle School, Clarksville, Indiana
NASA Technical Reports Server (NTRS)
1979-01-01
The solar energy retrofit heating system installed to provide heating for two gymnasiums at the Clarksville Middle School located in Clarksville, Indiana is described in detail. The system type is hot water using existing chilled water piping and chilled water coils in an air handler system. Flat plate, single-glazed selectively coated solar collectors were installed on the roof of each gymnasium. Total collector area covers 6,520 square feet. The liquid is stored in a 10,000 gallon steel tank installed below grade.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greene, J.A.
1991-06-01
A groundwater quality monitoring well installation program was conducted at Oak Ridge National Laboratory (ORNL) to meet the requirements of environmental regulations, including the Resource Conservation and Recovery Act (RCRA) and the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). A total of 173 wells were installed and developed at 11 different waste area groupings (WAGs) between June 1986 and November 1990. A location map of the wells is included.
Onshore industrial wind turbine locations for the United States up to March 2014
Diffendorfer, James E.; Kramer, Louisa; Ancona, Zachary H.; Garrity, Christopher P.
2015-01-01
Wind energy is a rapidly growing form of renewable energy in the United States. While summary information on the total amounts of installed capacity are available by state, a free, centralized, national, turbine-level, geospatial dataset useful for scientific research, land and resource management, and other uses did not exist. Available in multiple formats and in a web application, these public domain data provide industrial-scale onshore wind turbine locations in the United States up to March 2014, corresponding facility information, and turbine technical specifications. Wind turbine records have been collected and compiled from various public sources, digitized or position verified from aerial imagery, and quality assured and quality controlled. Technical specifications for turbines were assigned based on the wind turbine make and model as described in public literature. In some cases, turbines were not seen in imagery or turbine information did not exist or was difficult to obtain. Uncertainty associated with these is recorded in a confidence rating.
Li, Lin; Lian, Jing; Han, Yunping; Liu, Junxin
2012-05-01
Biofiltration for volatile organic compound control in waste gas streams is best operated at steady contaminant loadings. To provide long-term stable operation of a biofilter under adverse contaminant feeding conditions, an integrated bioreactor system with a gas separation membrane module installed after a biofilter was proposed for styrene treatment. Styrene was treated effectively, with average styrene effluent concentrations maintained at less than 50 mg m(-3) and a total removal efficiency of over 96% achieved when the biofiltration column faced fluctuating loads. The maximum elimination capacity of the integrated bioreactor system was 93.8 g m(-3)h(-1), which was higher than that obtained with the biofiltration column alone. The combination of these two processes (microbial and chemical) led to more efficient elimination of styrene and buffering of the fluctuating loads. The factors on gas membrane separation, microbial characteristics in the integrated bioreactor and membrane fouling were also investigated in this study. Copyright © 2012 Elsevier Ltd. All rights reserved.
Onshore industrial wind turbine locations for the United States up to March 2014.
Diffendorfer, Jay E; Kramer, Louisa A; Ancona, Zach H; Garrity, Christopher P
2015-11-24
Wind energy is a rapidly growing form of renewable energy in the United States. While summary information on the total amounts of installed capacity are available by state, a free, centralized, national, turbine-level, geospatial dataset useful for scientific research, land and resource management, and other uses did not exist. Available in multiple formats and in a web application, these public domain data provide industrial-scale onshore wind turbine locations in the United States up to March 2014, corresponding facility information, and turbine technical specifications. Wind turbine records have been collected and compiled from various public sources, digitized or position verified from aerial imagery, and quality assured and quality controlled. Technical specifications for turbines were assigned based on the wind turbine make and model as described in public literature. In some cases, turbines were not seen in imagery or turbine information did not exist or was difficult to obtain. Uncertainty associated with these is recorded in a confidence rating.
Berkas, W.R.; Lodderhose, J.R.
1985-01-01
The quality of water in the 15 mile downstream reach of Dardenne Creek in St. Charles County, Missouri, was assessed to determine if it met the Missouri water quality standards. Concentrations of dissolved oxygen and total ammonia failed to meet water quality standards downstream from the Harvester-Dardenne and St. Peters Wastewater-Treatment Plants. The QUAL-II SEMCOG water quality model was calibrated and verified using two independent data sets from Dardenne Creek. Management alternatives using current, design capacity, and future expansion wastewater discharges from the St. Peters Wastewater-Treatment Plant were evaluated. Results of the computer simulation indicate that a nitrification-type advanced-treatment facility installed at the plant would produce a 5-day carbonaceous biochemical oxygen demand of 10 mg/L. An effluent limit of 5.0 mg/L of 5-day carbonaceous biochemical oxygen demand would further improve the water quality of Dardenne Creek; however, an additional treatment process, such as sand filtration, would be needed to meet this criterion. (USGS)
2009-01-16
CAPE CANAVERAL, Fla. – In high bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a ballast assembly is moved above the Ares I-X segment 7. Ballast assemblies will be installed in the upper stage 1 and 7 segments and will mimic the mass of the fuel. Their total weight is approximately 160,000 pounds. Ares I-X is the test vehicle for the Ares I, which is part of the Constellation Program to return men to the moon and beyond. Ares I is the essential core of a safe, reliable, cost-effective space transportation system that eventually will carry crewed missions back to the moon, on to Mars and out into the solar system. Ares I may also use its 25-ton payload capacity to deliver resources and supplies to the International Space Station, or to "park" payloads in orbit for retrieval by other spacecraft bound for the moon or other destinations. The Ares I-X is targeted for launch in July 2009. Photo credit: NASA/Dimitri Gerondidakis
2009-01-16
CAPE CANAVERAL, Fla. – In high bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a ballast assembly is lowered into the Ares I-X segment 7. Ballast assemblies are being installed in the upper stage 1 and 7 segments and will mimic the mass of the fuel. Their total weight is approximately 160,000 pounds. Ares I-X is the test vehicle for the Ares I, which is part of the Constellation Program to return men to the moon and beyond. Ares I is the essential core of a safe, reliable, cost-effective space transportation system that eventually will carry crewed missions back to the moon, on to Mars and out into the solar system. Ares I may also use its 25-ton payload capacity to deliver resources and supplies to the International Space Station, or to "park" payloads in orbit for retrieval by other spacecraft bound for the moon or other destinations. The Ares I-X is targeted for launch in July 2009. Photo credit: NASA/Dimitri Gerondidakis
2009-01-16
CAPE CANAVERAL, Fla. – In high bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a ballast assembly is lowered into the Ares I-X segment 7. Ballast assemblies are being installed in the upper stage 1 and 7 segments and will mimic the mass of the fuel. Their total weight is approximately 160,000 pounds. Ares I-X is the test vehicle for the Ares I, which is part of the Constellation Program to return men to the moon and beyond. Ares I is the essential core of a safe, reliable, cost-effective space transportation system that eventually will carry crewed missions back to the moon, on to Mars and out into the solar system. Ares I may also use its 25-ton payload capacity to deliver resources and supplies to the International Space Station, or to "park" payloads in orbit for retrieval by other spacecraft bound for the moon or other destinations. The Ares I-X is targeted for launch in July 2009. Photo credit: NASA/Dimitri Gerondidakis
Linear transformer and primary low-inductance switch and capacitor modules for fast charging of PFL
NASA Astrophysics Data System (ADS)
Bykov, Yu A.; Krastelev, E. G.; Popov, G. V.; Sedin, A. A.; Feduschak, V. F.
2017-05-01
A step-up linear pulse transformer and a modular primary powering system were developed for fast (≈350 ns) charging of a pulse forming line (PFL) of a high-current electron accelerator. The linear transformer is assembled of a set of 20 inductors with circular ferromagnetic cores and one-turn primary windings. The secondary turn is formed by housing tube walls and a voltage adder with a film-glycerol insulation installed inside of the inductors. The primary powering system assembles 10 modules, each of them is a low-inductance site of two capacitors of 0,35 µF and one gas switch mounted at the same enclosure. The total stored energy is 5.5 kJ at the charging voltage of 40 kV. According to test results, the equivalent parameters at the output of the transformer are the next: a capacity - 17.5 nF, an inductance - 2 µH, a resistance - 3.2 Ohms.
Onshore industrial wind turbine locations for the United States up to March 2014
Diffendorfer, Jay E.; Kramer, Louisa A.; Ancona, Zach H.; Garrity, Christopher P.
2015-01-01
Wind energy is a rapidly growing form of renewable energy in the United States. While summary information on the total amounts of installed capacity are available by state, a free, centralized, national, turbine-level, geospatial dataset useful for scientific research, land and resource management, and other uses did not exist. Available in multiple formats and in a web application, these public domain data provide industrial-scale onshore wind turbine locations in the United States up to March 2014, corresponding facility information, and turbine technical specifications. Wind turbine records have been collected and compiled from various public sources, digitized or position verified from aerial imagery, and quality assured and quality controlled. Technical specifications for turbines were assigned based on the wind turbine make and model as described in public literature. In some cases, turbines were not seen in imagery or turbine information did not exist or was difficult to obtain. Uncertainty associated with these is recorded in a confidence rating. PMID:26601687
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laseke, B.A. Jr.
The report presents the results of a survey of operational flue gas desulfurization (FGD) systems on coal-fired utility boilers in the United States. The FGD system installed on Unit 1 at the Duck Creek Station of Central Illinois Light Company is described in terms of design and performance. The system consists of four parallel, wet-limestone, rod-deck scrubber modules designed for 25% capacity each, providing a total sulfur dioxide removal efficiency of 85%. The bottom ash, fly ash, and scrubbing wastes are disposed of in a sludge pond lined with a natural impermeable material. The first module of this four modulemore » FGD system was placed in service on July 1, 1976, and operated intermittently throughout the remainder of the year and for approximately one month in early 1977. On July 23, 1978, the three remaining modules were completed and all four modules were placed in the gas path for treatment of high sulfur flue gas.« less
A review of the hydrogeologic-geochemical model for Cerro Prieto
Lippmann, M.J.; Truesdell, A.H.; Halfman-Dooley, S. E.; Mañónm, A.
1991-01-01
With continued exploitation of the Cerro Prieto, Mexico, geothermal field, there is increasing evidence that the hydrogeologic model developed by Halfman and co-workers presents the basic features controlling the movement of geothermal fluids in the system. In mid-1987 the total installed capacity at Cerro Prieto reached 620 MWc, requiring a large rate of fluid production (more than 10,500 tonnes/hr of a brine-steam mixture; August 1988). This significant mass extraction has led to changes in reservoir thermodynamic conditions and in the chemistry of the produced fluids. Pressure drawdown has caused an increase in cold water recharge in the southern and western edges of the field, and local and general reservoir boiling in parts of the geothermal system. After reviewing the hydrogeologic and geochemical models of Cerro Prieto, the exploitation-induced cold water recharge and reservoir boiling (and plugging) observed in different areas of the field, are discussed and interpreted on the basis of these models and schematic flow models that describe the hydrogeology. ?? 1991.
Performance assessment of a pilot-size vacuum rotation membrane bioreactor treating urban wastewater
NASA Astrophysics Data System (ADS)
Alnaizy, Raafat; Aidan, Ahmad; Luo, Haonan
2011-12-01
This study investigated the suitability and performance of a pilot-scale membrane bioreactor (MBR). Huber vacuum rotation membrane (VRM 20/36) bioreactor was installed at the Sharjah sewage treatment plant (STP) in the United Arab Emirate for 12 months. The submerged membranes were flat sheets with a pore size of 0.038 μm. The VRM bioreactor provided a final effluent of very high quality. The average reduction on parameters such as COD was from 620 to 3 mg/l, BOD from 239 to 3 mg/l, Ammonia from 37 to 2 mg/l, turbidity from 225NTU to less than 3NTU, and total suspended solids from 304 mg/l to virtually no suspended solids. The rotating mechanism of the membrane panels permitted the entire membrane surface to receive the same intensive degree of air scouring, which lead to a longer duration. The MBR process holds a promising future because of its smaller footprints in contrast to conventional systems, superior effluent quality, and high loading rate capacity.
Integrating More Solar with Smart Inverters: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoke, Anderson F; Giraldez Miner, Julieta I; Symko-Davies, Martha
In Hawai'i, the relatively high cost of electricity costs coupled with various incentives have made it cost-effective to install solar photovoltaics (PV) on residential homes and larger central-station PV plants. On some of the islands, PV has reached over 50% of the installed generation capacity base. To make sure these inverter-based PV plants can maintain stable and safe operations, new smart inverter functionality is being evaluated and demonstrated at significant scale across the islands This paper describes research conducted to validate high PV penetration scenarios with smart inverters and recent progress on the use of these advanced inverter grid supportmore » functions in actual power grids in Hawai'i.« less
Lovrić, Vanja; Putnik, Predrag; Kovačević, Danijela Bursać; Jukić, Marijana; Dragović-Uzelac, Verica
2017-06-01
This research was undertaken to investigate the influence of extraction parameters during microwave-assisted extraction on total phenolic content, total flavonoids, total hydroxycinnamic acids and total flavonols of blackthorn flowers as well as to evaluate the antioxidant capacity by two different methods (2,2-diphenyl-1-picrylhydrazyl free radical scavenging capacity and ferric reducing antioxidant power assays). The investigated extraction parameters were: solvent type and volume fraction of alcohol in solvent (50 and 70% aqueous solutions of ethanol and methanol), extraction time (5, 15 and 25 min) and extraction temperature (40, 50 and 60 °C) controlled by microwave power of 100, 200 and 300 W. Multivariate analysis of variance (MANOVA) was used to evaluate the differences at a 95% confidence level (p≤0.05). The obtained results show that aqueous solution of ethanol was more appropriate solvent for extraction of phenolic compounds (total flavonoids, total hydroxycinnamic acids and total flavonols) than aqueous solution of methanol. The amount of phenolic compounds was higher in 70% aqueous solution of ethanol or methanol, while higher antioxidant capacity was observed in 50% aqueous solution of methanol. Higher temperature of extraction improved the amount of phenolic compounds and also antioxidant capacity determined by 2,2-diphenyl-1-picrylhydrazyl free radical scavenging capacity assay. Extensive duration of extraction (15- to 25-minute interval) has a significant effect only on the increase of total phenolic content, while specific phenolic compound content and antioxidant capacity were the highest when microwave extraction time of 5 min was applied.
Cryogenic studies for the proposed CERN large hadron electron collider (LHEC)
NASA Astrophysics Data System (ADS)
Haug, F.; LHeC Study Team, The
2012-06-01
The LHeC (Large Hadron electron Collider) is a proposed future colliding beam facility for lepton-nucleon scattering particle physics at CERN. A new 60 GeV electron accelerator will be added to the existing 27 km circumference 7 TeV LHC for collisions of electrons with protons and heavy ions. Two basic design options are being pursued. The first is a circular accelerator housed in the existing LHC tunnel which is referred to as the "Ring-Ring" version. Low field normal conducting magnets guide the particle beam while superconducting (SC) RF cavities cooled to 2 K are installed at two opposite locations at the LHC tunnel to accelerate the beams. For this version in addition a 10 GeV re-circulating SC injector will be installed. In total four refrigerators with cooling capacities between 1.2 kW and 3 kW @ 4.5 K are needed. The second option, referred to as the "Linac-Ring" version consists of a race-track re-circulating energyrecovery type machine with two 1 km long straight acceleration sections. The 944 high field 2 K SC cavities dissipate 30 kW at CW operation. Eight 10 kW @ 4.5 K refrigerators are proposed. The particle detector contains a combined SC solenoid and dipole forming the cold mass and an independent liquid argon calorimeter. Cooling is done with two individual small sized cryoplants; a 4.5 K helium, and a 87 K liquid nitrogen plant.
Reverse osmosis desalination: water sources, technology, and today's challenges.
Greenlee, Lauren F; Lawler, Desmond F; Freeman, Benny D; Marrot, Benoit; Moulin, Philippe
2009-05-01
Reverse osmosis membrane technology has developed over the past 40 years to a 44% share in world desalting production capacity, and an 80% share in the total number of desalination plants installed worldwide. The use of membrane desalination has increased as materials have improved and costs have decreased. Today, reverse osmosis membranes are the leading technology for new desalination installations, and they are applied to a variety of salt water resources using tailored pretreatment and membrane system design. Two distinct branches of reverse osmosis desalination have emerged: seawater reverse osmosis and brackish water reverse osmosis. Differences between the two water sources, including foulants, salinity, waste brine (concentrate) disposal options, and plant location, have created significant differences in process development, implementation, and key technical problems. Pretreatment options are similar for both types of reverse osmosis and depend on the specific components of the water source. Both brackish water and seawater reverse osmosis (RO) will continue to be used worldwide; new technology in energy recovery and renewable energy, as well as innovative plant design, will allow greater use of desalination for inland and rural communities, while providing more affordable water for large coastal cities. A wide variety of research and general information on RO desalination is available; however, a direct comparison of seawater and brackish water RO systems is necessary to highlight similarities and differences in process development. This article brings to light key parameters of an RO process and process modifications due to feed water characteristics.
Installed Base Registration of Decentralised Solar Panels with Applications in Crisis Management
NASA Astrophysics Data System (ADS)
Aarsen, R.; Janssen, M.; Ramkisoen, M.; Biljecki, F.; Quak, W.; Verbree, E.
2015-08-01
In case of a calamity in the Netherlands - e.g. a dike breach - parts of the nationwide electric network can fall out. In these occasions it would be useful if decentralised energy sources of the Smart Grid would contribute to balance out the fluctuations of the energy network. Decentralised energy sources include: solar energy, wind energy, combined heat and power, and biogas. In this manner, parts of the built environment - e.g. hospitals - that are in need of a continuous power flow, could be secured of this power. When a calamity happens, information about the Smart Grid is necessary to control the crisis and to ensure a shared view on the energy networks for both the crisis managers and network operators. The current situation of publishing, storing and sharing data of solar energy has been shown a lack of reliability about the current number, physical location, and capacity of installed decentralised photovoltaic (PV) panels in the Netherlands. This study focuses on decentralised solar energy in the form of electricity via PV panels in the Netherlands and addresses this challenge by proposing a new, reliable and up-to-date database. The study reveals the requirements for a registration of the installed base of PV panels in the Netherlands. This new database should serve as a replenishment for the current national voluntary registration, called Production Installation Register of Energy Data Services Netherland (EDSN-PIR), of installed decentralised PV panel installations in the Smart Grid, and provide important information in case of a calamity.
Total Brain Death and the Integration of the Body Required of a Human Being
Lee, Patrick
2016-01-01
I develop and refine an argument for the total brain death criterion of death previously advanced by Germain Grisez and me: A human being is essentially a rational animal, and so must have a radical capacity for rational operations. For rational animals, conscious sensation is a pre-requisite for rational operation. But total brain death results in the loss of the radical capacity for conscious sensation, and so also for rational operations. Hence, total brain death constitutes a substantial change—the ceasing to be of the human being. Objections are considered, including the objection that total brain death need not result in the loss of capacity for sensation, and that damage to the brain less than total brain death can result in loss of capacity for rational operations. PMID:27097647
Evaluation of the mobile phone electromagnetic radiation on serum iron parameters in rats.
Çetkin, Murat; Demirel, Can; Kızılkan, Neşe; Aksoy, Nur; Erbağcı, Hülya
2017-03-01
Electromagnetic fields (EMF) created by mobile phones during communication have harmful effects on different organs. It was aimed to investigate the effects of an EMF created by a mobile phone on serum iron level, ferritin, unsaturated iron binding capacity and total iron binding capacity within a rat experiment model. A total of 32 male Wistar albino rats were randomly divided into the control, sham, mobile phone speech (2h/day) and stand by (12 h/day) groups. The speech and stand by groups were subjected to the EMF for a total of 10 weeks. No statistically significant difference was observed between the serum iron and ferritin values of the rats in the speech and stand by groups than the control and sham groups (p>0.05). The unsaturated iron binding capacity and total iron capacity values of the rats in the speech and stand by groups were significantly lower in comparison to the control group (p<0.01). It was found that exposure to EMF created by mobile phones affected unsaturated iron binding capacity and total iron binding capacity negatively.
NASA Astrophysics Data System (ADS)
Yang, J.; Mauzerall, D. L.; Wagner, F.; Li, X.
2016-12-01
Solar photovoltaic (PV) technology can greatly reduce both air pollution and GHG emissions from the power sector. The Chinese government has plans to scale up solar PV installation between now and 2030. However, there is little analysis of how deployment strategies will influence the range of benefits. Here we conduct the first integrated assessment study that quantifies the climate, air quality, and related human health benefits of various solar PV development strategies in 2030 China. Our results indicate that both the location of PV deployment, which coal power plants are replaced, and the extent of inter-provincial transmission greatly influence the co-benefits. We compare CO2 and PM2.5 reductions from two PV installation scenarios both with the 2030 government target of 400 GW national installed capacity. First, we assume all solar PV is utilized within the province in which it is generated and that it can not exceed 30% of total provincial electricity generation. We find that deploying more solar PV in locations near load centers via distributed PV systems has larger benefits and could lead to approximately 20,500 (between 8000 - 32,400, high and low bounds) annual avoided premature deaths, 15% more than building utility-scale solar PV plants in the sunny, yet sparsely populated northwest. The difference occurs because in the northwest a lower population and cleaner air leads to smaller reductions in air pollution related premature mortalities. Also greater potential for PV curtailment exists in the west. In terms of CO2 reduction, deploying PV near load centers leads to 12% greater reductions in CO2 emissions from the power sector - approximately 5% of China's total CO2 emission in 2030. Second, we enable inter-provincial transmission of PV electricity within each of China's six regional grids which allows greater use of abundant sunlight in the northwest. Our results for 2030 show that by expanding to the regional grid, curtailment rates in the northwest would drop from 25% to 14%, and additional reductions of 30% SO2 and 25% NOxfrom the power sector would result. Thus our study demonstrates substantial air quality and climate co-benefits of developing solar PV in China. We also find that expanding inter-provincial electricity transmission would both reduce curtailment and increase air quality benefits.
Code of Federal Regulations, 2012 CFR
2012-07-01
... consistent with the manufacturer's recommendations within 15 days or by the next time any process vent stream... the manufacturer's recommendations within 15 days or by the next time any process vent stream is...) Determine gas stream flow using the design blower capacity, with appropriate adjustments for pressure drop...
46 CFR 183.340 - Cable and wiring requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... a manner as to avoid chafing and other damage. The use of plastic tie wraps must be limited to... requirements. (a) If individual wires, rather than cable, are used in systems greater than 50 volts, the wire... current carrying capacity for the circuit in which they are used; (2) Be installed in a manner to avoid or...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-08
... refurbished and re-installed small ``fire pump'' turbine direct coupled to a 120 kilowatt, 2300 volt, AC synchronous vertically mounted generator. The ``fire pump'' turbine is located in the southwest corner of the existing turbine pit. The ``fire pump'' turbine has a rated maximum hydraulic capacity of 106 cubic feet...
Gazprom Market for energy installations using fuel cells
DOE Office of Scientific and Technical Information (OSTI.GOV)
Galitskiy, Yu.V.
1996-04-01
The Gazprom RAO [Russian joint-stock company] is a major industrial and financial complex whose job is to provide gas for the national economy of Russia, as well as to supply it under international and intergovernmental agreements. The existing capacity of its production structures and high level of scientific potential allow Gazprom to forecast the future with confidence.
AUTOMOTIVE DIESEL MAINTENANCE 2. UNIT XIII, BATTERY SERVICE AND TESTING PROCEDURES--PART II.
ERIC Educational Resources Information Center
Human Engineering Inst., Cleveland, OH.
THIS MODULE OF A 25-MODULE COURSE IS DESIGNED TO FAMILIARIZE THE TRAINEE WITH PROCEDURES FOR SERVICING LEAD-ACID STORAGE BATTERIES USED ON DIESEL POWERED EQUIPMENT. TOPICS ARE (1) ELECTROLYTE AND SPECIFIC GRAVITY, (2) BATTERY CHARGING, (3) STORAGE BATTERY TYPES AND DESIGN, (4) BATTERY CAPACITY RATINGS, (5) BATTERY INSTALLATION, SERVICING, AND…
Use of pre-fabricated Parshall flumes to measure streamflow in permafrost-dominated watersheds.
Charles W. Slaughter
1981-01-01
The occurrence of permafrost in stream valleys of central Alaska causes problems with conventional stream-gauging installations. To minimize both thermal and physical disturbance at measurement sites, pre-fabricated Parshall flumes have been used to monitor streamflow at sites underlain with permafrost in a subarctic research watershed. Flumes ranging in capacity from...
46 CFR 194.10-20 - Magazine chest construction.
Code of Federal Regulations, 2012 CFR
2012-10-01
... lid shall have a minimum thickness of 1/8 inch. (b) Permanent sun shields shall be provided for sides... distance of 11/2 inches. Sun shields may be omitted when chests are installed “on deck protected,” shielded from direct exposure to the sun. (c) Chests shall be limited to a gross capacity of 100 cubic feet. (d...
46 CFR 194.10-20 - Magazine chest construction.
Code of Federal Regulations, 2010 CFR
2010-10-01
... lid shall have a minimum thickness of 1/8 inch. (b) Permanent sun shields shall be provided for sides... distance of 11/2 inches. Sun shields may be omitted when chests are installed “on deck protected,” shielded from direct exposure to the sun. (c) Chests shall be limited to a gross capacity of 100 cubic feet. (d...
46 CFR 194.10-20 - Magazine chest construction.
Code of Federal Regulations, 2014 CFR
2014-10-01
... lid shall have a minimum thickness of 1/8 inch. (b) Permanent sun shields shall be provided for sides... distance of 11/2 inches. Sun shields may be omitted when chests are installed “on deck protected,” shielded from direct exposure to the sun. (c) Chests shall be limited to a gross capacity of 100 cubic feet. (d...
46 CFR 194.10-20 - Magazine chest construction.
Code of Federal Regulations, 2011 CFR
2011-10-01
... lid shall have a minimum thickness of 1/8 inch. (b) Permanent sun shields shall be provided for sides... distance of 11/2 inches. Sun shields may be omitted when chests are installed “on deck protected,” shielded from direct exposure to the sun. (c) Chests shall be limited to a gross capacity of 100 cubic feet. (d...
46 CFR 194.10-20 - Magazine chest construction.
Code of Federal Regulations, 2013 CFR
2013-10-01
... lid shall have a minimum thickness of 1/8 inch. (b) Permanent sun shields shall be provided for sides... distance of 11/2 inches. Sun shields may be omitted when chests are installed “on deck protected,” shielded from direct exposure to the sun. (c) Chests shall be limited to a gross capacity of 100 cubic feet. (d...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-06
...; (2) a powerhouse containing one Kaplan generating unit having an installed capacity of 800 kilowatts... Commission's website ( http://www.ferc.gov/docs-filing/ferconline.asp ) under the ``eFiling'' link. For a... this project, including a copy of the application, can be viewed or printed on the ``eLibrary'' link of...
Renewable Electricity Policy in Germany, 1974 to 2005
ERIC Educational Resources Information Center
Lauber, Volkmar; Mez, Lutz
2006-01-01
Of the large industrial countries, Germany is clearly leading with regard to new renewable energy sources, occupying first rank in terms of installed capacity for wind energy and second for photovoltaics. This is not because of an exceptional natural resource base but because of public policy in this area, despite the fact that this policy was…
30 CFR 75.1107-6 - Capacity of fire suppression devices; location and direction of nozzles.
Code of Federal Regulations, 2010 CFR
2010-07-01
... withstand rough usage and vibration when installed on mining equipment. (b) The extinguishant-discharge... electrical cables on the equipment which are subject to flexing or to external damage; and (2) All hydraulic components on the equipment which are exposed directly to or located in the immediate vicinity of electrical...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-12
.... Columbia would also construct miscellaneous aboveground equipment including the installation of a pig launcher,\\2\\ pig receiver, mainline valve, and a gas heater. \\1\\ A pipeline loop is a segment of pipe constructed parallel to an existing pipeline to increase capacity. \\2\\ A ``pig'' is a tool that the pipeline...
Vehicle Support Posts Installation onto Mobile Launcher
2017-05-11
Construction workers on the deck of the mobile launcher prepare the platforms for installation of vehicle support posts at NASA's Kennedy Space Center in Florida. At left, four of the support posts are installed. A total of eight support posts will be installed to support the load of the Space Launch System's (SLS) solid rocket boosters, with four posts for each of the boosters. The support posts are about five feet tall and each weigh about 10,000 pounds. The posts will structurally support the SLS rocket through T-0 and liftoff, and will drop down before vehicle liftoff to avoid contact with the flight hardware. The Ground Systems Development and Operations Program is overseeing installation of the support posts to prepare for the launch of the Orion spacecraft atop the SLS rocket.
LCOE reduction potential of parabolic trough and solar tower CSP technology until 2025
NASA Astrophysics Data System (ADS)
Dieckmann, Simon; Dersch, Jürgen; Giuliano, Stefano; Puppe, Michael; Lüpfert, Eckhard; Hennecke, Klaus; Pitz-Paal, Robert; Taylor, Michael; Ralon, Pablo
2017-06-01
Concentrating Solar Power (CSP), with an installed capacity of 4.9 GW by 2015, is a young technology compared to other renewable power generation technologies. A limited number of plants and installed capacity in a small challenging market environment make reliable and transparent cost data for CSP difficult to obtain. The International Renewable Energy Agency (IRENA) and the DLR German Aerospace Center gathered and evaluated available cost data from various sources for this publication in order to yield transparent, reliable and up-to-date cost data for a set of reference parabolic trough and solar tower plants in the year 2015 [1]. Each component of the power plant is analyzed for future technical innovations and cost reduction potential based on current R&D activities, ongoing commercial developments and growth in market scale. The derived levelized cost of electricity (LCOE) for 2015 and 2025 are finally contrasted with published power purchase agreements (PPA) of the NOOR II+III power plants in Morocco. At 7.5% weighted average cost of capital (WACC) and 25 years economic life time, the levelized costs of electricity for plants with 7.5 (trough) respectively 9 (tower) full-load hours thermal storage capacity decrease from 14-15 -ct/kWh today to 9-10 -ct/kWh by 2025 for both technologies at direct normal irradiation of 2500 kWh/(m².a). The capacity factor increases from 41.1% to 44.6% for troughs and from 45.5% to 49.0% for towers. Financing conditions are a major cost driver and offer potential for further cost reduction with the maturity of the technology and low interest rates (6-7 - ct/kWh for 2% WACC at 2500 kWh/(m2.a) in 2025).
The contribution of Paris to limit global warming to 2 °C
DOE Office of Scientific and Technical Information (OSTI.GOV)
Iyer, Gokul C.; Edmonds, James A.; Fawcett, Allen A.
International negotiators have clearly articulated a goal to limit global warming to 2°C. In preparation for the 21st Conference of Parties (COP21) in Paris in December 2015, countries are submitting their Intended Nationally Determined Contributions (INDCs) to the United Nations Framework Convention on Climate Change indicating their emissions reduction commitments through 2025 or 2030. Limiting global warming to 2°C is a challenging goal and will entail a dramatic transformation of the global energy system, largely complete by 2040. The deliberations in Paris will help determine the balance of challenges faced in the near-term and long-term. We use GCAM, a globalmore » integrated assessment model, to analyze the energy and economic-cost implications of INDCs. The INDCs imply near-term actions that reduce the level of mitigation needed in the post-2030 period, particularly when compared with an alternative path, in which nations are unable to undertake emissions mitigation until after 2030. We find that the latter case could require up to 2300 GW of premature retirements of fossil fuel power plants and up to 2900 GW of additional low-carbon power capacity installations within a five-year period of 2031 to 2035. INDCs have the effect of reducing premature retirements and new-capacity installations after 2030 by 50% and 34% respectively. However, if presently announced INDCs were strengthened to achieve greater near-term emissions mitigation, the 2031-2035 transformation could be tempered to require 84% fewer premature retirements of power generation capacity and 56% fewer new-capacity additions. Our results suggest that the ensuing COP21 in Paris will be critical in shaping the challenges of limiting global warming to 2°C.« less
Dale, Michael; Benson, Sally M
2013-04-02
A combination of declining costs and policy measures motivated by greenhouse gas (GHG) emissions reduction and energy security have driven rapid growth in the global installed capacity of solar photovoltaics (PV). This paper develops a number of unique data sets, namely the following: calculation of distribution of global capacity factor for PV deployment; meta-analysis of energy consumption in PV system manufacture and deployment; and documentation of reduction in energetic costs of PV system production. These data are used as input into a new net energy analysis of the global PV industry, as opposed to device level analysis. In addition, the paper introduces a new concept: a model tracking energetic costs of manufacturing and installing PV systems, including balance of system (BOS) components. The model is used to forecast electrical energy requirements to scale up the PV industry and determine the electricity balance of the global PV industry to 2020. Results suggest that the industry was a net consumer of electricity as recently as 2010. However, there is a >50% that in 2012 the PV industry is a net electricity provider and will "pay back" the electrical energy required for its early growth before 2020. Further reducing energetic costs of PV deployment will enable more rapid growth of the PV industry. There is also great potential to increase the capacity factor of PV deployment. These conclusions have a number of implications for R&D and deployment, including the following: monitoring of the energy embodied within PV systems; designing more efficient and durable systems; and deploying PV systems in locations that will achieve high capacity factors.
The contribution of Paris to limit global warming to 2 °C
NASA Astrophysics Data System (ADS)
Iyer, Gokul C.; Edmonds, James A.; Fawcett, Allen A.; Hultman, Nathan E.; Alsalam, Jameel; Asrar, Ghassem R.; Calvin, Katherine V.; Clarke, Leon E.; Creason, Jared; Jeong, Minji; Kyle, Page; McFarland, James; Mundra, Anupriya; Patel, Pralit; Shi, Wenjing; McJeon, Haewon C.
2015-12-01
The international community has set a goal to limit global warming to 2 °C. Limiting global warming to 2 °C is a challenging goal and will entail a dramatic transformation of the global energy system, largely complete by 2040. As part of the work toward this goal, countries have been submitting their Intended Nationally Determined Contributions (INDCs) to the United Nations Framework Convention on Climate Change, indicating their emissions reduction commitments through 2025 or 2030, in advance of the 21st Conference of the Parties (COP21) in Paris in December 2015. In this paper, we use the Global Change Assessment Model (GCAM) to analyze the near versus long-term energy and economic-cost implications of these INDCs. The INDCs imply near-term actions that reduce the level of mitigation needed in the post-2030 period, particularly when compared with an alternative path in which nations are unable to undertake emissions mitigation until after 2030. We find that the latter case could require up to 2300 GW of premature retirements of fossil fuel power plants and up to 2900 GW of additional low-carbon power capacity installations within a five-year period of 2031-2035. INDCs have the effect of reducing premature retirements and new-capacity installations after 2030 by 50% and 34%, respectively. However, if presently announced INDCs were strengthened to achieve greater near-term emissions mitigation, the 2031-2035 transformation could be tempered to require 84% fewer premature retirements of power generation capacity and 56% fewer new-capacity additions. Our results suggest that the INDCs delivered for COP21 in Paris will have important contributions in reducing the challenges of achieving the goal of limiting global warming to 2 °C.
NASA Technical Reports Server (NTRS)
Deckert, W. H.; Rolls, L. S.
1974-01-01
An integrated propulsion/control system for lift-fan transport aircraft is described. System behavior from full-scale experimental and piloted simulator investigations are reported. The lift-fan transport is a promising concept for short-to-medium haul civil transportation and for other missions. The lift-fan transport concept features high cruise airspeed, favorable ride qualities, small perceived noise footprints, high utilization, transportation system flexibility, and adaptability to VTOL, V/STOL, or STOL configurations. The lift-fan transport has high direct operating costs in comparison to conventional aircraft, primarily because of propulsion system and aircraft low-speed control system installation requirements. An integrated lift-fan propulsion system/aircraft low-speed control system that reduces total propulsion system and control system installation requirements is discussed.
Development of a Telemetry and Yield-Mapping System of Olive Harvester
Castillo-Ruiz, Francisco J.; Pérez-Ruiz, Manuel; Blanco-Roldán, Gregorio L.; Gil-Ribes, Jesús A.; Agüera, Juan
2015-01-01
Sensors, communication systems and geo-reference units are required to achieve an optimized management of agricultural inputs with respect to the economic and environmental aspects of olive groves. In this study, three commercial olive harvesters were tracked during two harvesting seasons in Spain and Chile using remote and autonomous equipment that was developed to determine their time efficiency and effective based on canopy shaking for fruit detachment. These harvesters work in intensive/high-density (HD) and super-high-density (SHD) olive orchards. A GNSS (Global Navigation Satellite System) and GSM (Global System for Mobile Communications) device was installed to track these harvesters. The GNSS receiver did not affect the driver’s work schedule. Time elements methodology was adapted to the remote data acquisition system. The effective field capacity and field efficiency were investigated. In addition, the field shape, row length, angle between headland alley and row, and row alley width were measured to determinate the optimum orchard design parameters value. The SHD olive harvester showed significant lower effective field capacity values when alley width was less than 4 m. In addition, a yield monitor was developed and installed on a traditional olive harvester to obtain a yield map from the harvested area. The hedge straddle harvester stood out for its highly effective field capacity; nevertheless, a higher field efficiency was provided by a non-integral lateral canopy shaker. All of the measured orchard parameters have influenced machinery yields, whether effective field capacity or field efficiency. A saving of 40% in effective field capacity was achieved with a reduction from 4 m or higher to 3.5 m in alley width for SHD olive harvester. A yield map was plotted using data that were acquired by a yield monitor, reflecting the yield gradient in spite of the larger differences between tree yields. PMID:25675283
NASA Astrophysics Data System (ADS)
Guachamin Acero, Wilson; Gao, Zhen; Moan, Torgeir
2017-09-01
Current installation costs of offshore wind turbines (OWTs) are high and profit margins in the offshore wind energy sector are low, it is thus necessary to develop installation methods that are more efficient and practical. This paper presents a numerical study (based on a global response analysis of marine operations) of a novel procedure for installing the tower and Rotor Nacelle Assemblies (RNAs) on bottom-fixed foundations of OWTs. The installation procedure is based on the inverted pendulum principle. A cargo barge is used to transport the OWT assembly in a horizontal position to the site, and a medium-size Heavy Lift Vessel (HLV) is then employed to lift and up-end the OWT assembly using a special upending frame. The main advantage of this novel procedure is that the need for a huge HLV (in terms of lifting height and capacity) is eliminated. This novel method requires that the cargo barge is in the leeward side of the HLV (which can be positioned with the best heading) during the entire installation. This is to benefit from shielding effects of the HLV on the motions of the cargo barge, so the foundations need to be installed with a specific heading based on wave direction statistics of the site and a typical installation season. Following a systematic approach based on numerical simulations of actual operations, potential critical installation activities, corresponding critical events, and limiting (response) parameters are identified. In addition, operational limits for some of the limiting parameters are established in terms of allowable limits of sea states. Following a preliminary assessment of these operational limits, the duration of the entire operation, the equipment used, and weather- and water depth-sensitivity, this novel procedure is demonstrated to be viable.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Extinguishing Systems.For establishments filling, installing, servicing, using, or disposing of containers or systems to be used in total flooding applications, EPA recommends the following: —appropriate protective... 2010 standard for Aerosol Extinguishing Systems.For establishments filling, installing, servicing...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Extinguishing Systems.For establishments filling, installing, servicing, using, or disposing of containers or systems to be used in total flooding applications, EPA recommends the following: —appropriate protective... 2010 standard for Aerosol Extinguishing Systems.For establishments filling, installing, servicing...
Code of Federal Regulations, 2011 CFR
2011-04-01
... system, what are the total estimated costs of the system, including but not limited to, the costs of... productive well cannot be installed, include a statement to the effect that there is no assurance a productive well can be installed and, if it cannot, no refund of the purchase price of the lot will be made...
Code of Federal Regulations, 2012 CFR
2012-04-01
... system, what are the total estimated costs of the system, including but not limited to, the costs of... productive well cannot be installed, include a statement to the effect that there is no assurance a productive well can be installed and, if it cannot, no refund of the purchase price of the lot will be made...
Code of Federal Regulations, 2012 CFR
2012-01-01
... other individual system, what are the total estimated costs of the system, including but not limited to... the event a productive well cannot be installed, include a statement to the effect that there is no assurance a productive well can be installed and, if it cannot, no refund of the purchase price of the lot...