Scholes, Corey; Sahni, Varun; Lustig, Sebastien; Parker, David A; Coolican, Myles R J
2014-03-01
The introduction of patient-specific instruments (PSI) for guiding bone cuts could increase the incidence of malalignment in primary total knee arthroplasty. The purpose of this study was to assess the agreement between one type of patient-specific instrumentation (Zimmer PSI) and the pre-operative plan with respect to bone cuts and component alignment during TKR using imageless computer navigation. A consecutive series of 30 femoral and tibial guides were assessed in-theatre by the same surgeon using computer navigation. Following surgical exposure, the PSI cutting guides were placed on the joint surface and alignment assessed using the navigation tracker. The difference between in-theatre data and the pre-operative plan was recorded and analysed. The error between in-theatre measurements and pre-operative plan for the femoral and tibial components exceeded 3° for 3 and 17% of the sample, respectively, while the error for total coronal alignment exceeded 3° for 27% of the sample. The present results indicate that alignment with Zimmer PSI cutting blocks, assessed by imageless navigation, does not match the pre-operative plan in a proportion of cases. To prevent unnecessary increases in the incidence of malalignment in primary TKR, it is recommended that these devices should not be used without objective verification of alignment, either in real-time or with post-operative imaging. Further work is required to identify the source of discrepancies and validate these devices prior to routine use. II.
Code of Federal Regulations, 2010 CFR
2010-07-01
... facilities on a per-pupil basis. (b) Quality of plan. (1) The likelihood that the proposed grant project will... a program without the total amount of assistance (State and Federal) declining over a five-year... authorized purposes. (3) The quality of the plan for identifying charter schools and determining their...
Code of Federal Regulations, 2011 CFR
2011-07-01
... facilities on a per-pupil basis. (b) Quality of plan. (1) The likelihood that the proposed grant project will... a program without the total amount of assistance (State and Federal) declining over a five-year... authorized purposes. (3) The quality of the plan for identifying charter schools and determining their...
2013 DOE Vehicle Technologies Office Annual Merit Review
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
The 2013 U.S. Department of Energy (DOE) Fuel Cell Technologies Office (FCTO) and Vehicle Technologies Office (VTO) Annual Merit Review and Peer Evaluation Meeting (AMR) was held May 13-17, 2013, in Crystal City, Virginia. The review encompassed all of the work done by the FCTO and the VTO: a total of 287 individual activities were reviewed for VTO, by a total of 187 reviewers. A total of 1,382 individual review responses were received for the VTO technical reviews. The objective of the meeting was to review the accomplishments and plans for VTO over the previous 12 months, and provide anmore » opportunity for industry, government, and academia to give inputs to DOE on the Office with a structured and formal methodology. The meeting also provided attendees with a forum for interaction and technology information transfer.« less
2014 DOE Vehicle Technologies Office Annual Merit Review
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
The 2014 U.S. Department of Energy (DOE) Fuel Cell Technologies Office (FCTO) and Vehicle Technologies Office (VTO) Annual Merit Review and Peer Evaluation Meeting (AMR) was held June 16-20, 2014, in Washington, DC. The review encompassed all of the work done by the FCTO and the VTO: a total of 295 individual activities were reviewed for VTO, by a total of 179 reviewers. A total of 1,354 individual review responses were received for the VTO technical reviews. The objective of the meeting was to review the accomplishments and plans for VTO over the previous 12 months, and provide an opportunitymore » for industry, government, and academia to give inputs to DOE on the Office with a structured and formal methodology. The meeting also provided attendees with a forum for interaction and technology information transfer.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Amy Honchar
The contribution of funds from DOE supported publication costs of a special issue of Deep Sea Research arising from presentations at the First U.S. Atlantic Meridional Overturning Circulation (AMOC) Meeting held 4-6 May, 2009 to review the US implementation plan and its coordination with other monitoring activities. The special issue includes a total of 16 papers, including publications from three DOE-supported investigators (ie Sevellec, F., and A.V. Fedorov; Hu et. al., and Wan et. al.,). The special issue addresses DOE interests in understanding and simulation/modeling of abrupt climate change.
Planning or something else? Examining neuropsychological predictors of Zoo Map performance.
Oosterman, Joukje M; Wijers, Marijn; Kessels, Roy P C
2013-01-01
The Zoo Map Test of the Behavioral Assessment of the Dysexecutive Syndrome battery is often applied to measure planning ability as part of executive function. Successful performance on this test is, however, dependent on various cognitive functions, and deficient Zoo Map performance does therefore not necessarily imply selectively disrupted planning abilities. To address this important issue, we examined whether planning is still the most important predictor of Zoo Map performance in a heterogeneous sample of neurologic and psychiatric outpatients (N = 71). In addition to the Zoo Map Test, the patients completed other neuropsychological tests of planning, inhibition, processing speed, and episodic memory. Planning was the strongest predictor of the total raw score and inappropriate places visited, and no additional contribution of other cognitive scores was found. One exception to this was the total time, which was associated with processing speed. Overall, our findings indicate that the Zoo Map Test is a valid indicator of planning ability in a heterogeneous patient sample.
5 CFR 1690.14 - Checks made payable to the Thrift Savings Plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... and satisfaction. The TSP does not agree to accept less than the total amount due by negotiating an... full” or “submitted in full satisfaction of claims”), or by negotiating an instrument that is...
The Future of Theater Missile Defense
1994-06-01
fiscal years, and all costs are expressed in constant 1995 dollars of budget authority. Numbers in text and tables may not add to totals because of...plan goes too far. Others think that it does not go far enough. This Congressional Budget Office (CBO) paper analyzes the costs and capabilities of...compliance issues that the plan may raise with the Anti-Ballistic Missile Treaty. Finally, it analyzes the costs and effects of several alternatives to the
10 CFR 1021.200 - DOE planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false DOE planning. 1021.200 Section 1021.200 Energy DEPARTMENT... Decisionmaking § 1021.200 DOE planning. (a) DOE shall provide for adequate and timely NEPA review of DOE... accordance with 40 CFR 1501.2 and this section. In its planning for each proposal, DOE shall include adequate...
Selenide isotope generator for the Galileo mission. Reliability program plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1978-10-01
The reliability program plan for the Selenide Isotope Generator (SIG) program is presented. It delineates the specific tasks that will be accomplished by Teledyne Energy Systems and its suppliers during design, development, fabrication and test of deliverable Radioisotopic Thermoelectric Generators (RTG), Electrical Heated Thermoelectric Generators (ETG) and associated Ground Support Equipment (GSE). The Plan is formulated in general accordance with procedures specified in DOE Reliability Engineering Program Requirements Publication No. SNS-2, dated June 17, 1974. The Reliability Program Plan presented herein defines the total reliability effort without further reference to Government Specifications. The reliability tasks to be accomplished are delineatedmore » herein and become the basis for contract compliance to the extent specified in the SIG contract Statement of Work.« less
A Reliability Improvement Program Planning Report for the SNAP 10A Space Nuclear Power Unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Coombs, M. G.; Smith, C. K.; Wilson, L. A.
1961-03-14
The estimated achieved reliability of SNAP 10A space nuclear power units will be relatively low at the timeof the first SNAPSHOT flight test in April 1963 and the existing R&D program does not provide a significant reliabiity growth thereafter. The total costs of an 8-satellite network using SNAP 10A units over a 5-year period has been approximated for the case where the total cost of a single satellite launched is 8 million dollars.
The Thrifty Food Plan is not thrifty when labor cost is considered.
Davis, George C; You, Wen
2010-04-01
Recent research has shown that the typical Supplemental Food Assistance Program (SNAP) family falls short in meeting the Thrifty Food Plan (TFP) nutritional guidelines that underlie the SNAP even when they typically have sufficient monetary resources to eat a healthful diet (i.e. to follow the TFP recommendations). However, the TFP does not consider labor cost. This study uses a basic labor economics technique to value labor in a home food production scenario that is required to reach the TFP nutrition and budget targets and calculates the total cost (inclusive of labor) associated with the TFP. This TFP consistent total cost is then compared, using several metrics, with the total cost associated with actual choices made by those families sharing the same profiles as current SNAP participants. Once labor is included, we find the TFP is not very thrifty and the mean household falls short of the TFP guidelines even with adequate monetary resources.
Hellander, Ida; Himmelstein, David U; Woolhandler, Steffie
2013-01-01
Previous research has documented Medicare overpayments to the private Medicare Advantage (MA) plans that compete with traditional fee-for-service Medicare. This research has assessed individual categories of overpayment for, at most, a few years. However, no study has calculated the total overpayments to private plans since the program's inception. Prior to 2004, selective enrollment of healthier seniors was the major source of excess payments. We estimate this has added US$41 billion to Medicare's costs since 1985. Medicare adopted a risk-adjustment scheme in 2004, but this has not curbed private plans' ability to game the payment system. This has added US$122.5 billion to Medicare's costs since 2004. Congress mandated increased payment to private plans in the 2003 Medicare Modernization Act, which was mitigated, to a degree, by the subsequent Affordable Care Act. In total, we find that Medicare has overpaid private insurers by US$282.6 billion since 1985. Risk adjustment does not work in for-profit MA plans, which have a financial incentive, the data, and the ingenuity to game whatever system Medicare devises. It is time to end Medicare's costly experiment with privatization. The U.S. needs to adopt a single-payer national health insurance program with effective methods for controlling costs.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false How does the continuation of health plan... system? 1002.171 Section 1002.171 Employees' Benefits OFFICE OF THE ASSISTANT SECRETARY FOR VETERANS... Service in the Uniformed Services Health Plan Coverage § 1002.171 How does the continuation of health plan...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a ``bottom up`` approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE`s commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE`s environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less
76 FR 53703 - Agency Information Collection Activities: Proposed Request and Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-29
... verification for such individuals. Accessing Screen Pop, callers enter their Social Security number (SSN) using... (paper) 2,000 1 30 1,000 Totals 16,000 8,000 2. Plan for Achieving Self-Support (PASS)--20 CFR 416.110(e... workforce and become self-supporting. In turn, SSA does not count the income or resources recipients use to...
42 CFR 423.279 - National average monthly bid amount.
Code of Federal Regulations, 2014 CFR
2014-10-01
... each MA-PD plan described in section 1851(a)(2)(A)(i) of the Act. The calculation does not include bids... section 1876(h) of the Act. (b) Calculation of weighted average. (1) The national average monthly bid... defined in § 422.258(c)(1) of this chapter) and the denominator equal to the total number of Part D...
42 CFR 423.279 - National average monthly bid amount.
Code of Federal Regulations, 2013 CFR
2013-10-01
... each MA-PD plan described in section 1851(a)(2)(A)(i) of the Act. The calculation does not include bids... section 1876(h) of the Act. (b) Calculation of weighted average. (1) The national average monthly bid... defined in § 422.258(c)(1) of this chapter) and the denominator equal to the total number of Part D...
42 CFR 423.279 - National average monthly bid amount.
Code of Federal Regulations, 2012 CFR
2012-10-01
... each MA-PD plan described in section 1851(a)(2)(A)(i) of the Act. The calculation does not include bids... section 1876(h) of the Act. (b) Calculation of weighted average. (1) The national average monthly bid... defined in § 422.258(c)(1) of this chapter) and the denominator equal to the total number of Part D...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Truex, Michael J.; Strickland, Christopher E.; Johnson, Christian D.
Over decades of operation, the U.S. Department of Energy (DOE) and its predecessors have released nearly 2 trillion L (450 billion gal.) of liquid into the vadose zone at the Hanford Site. Much of this discharge of liquid waste into the vadose zone occurred in the Central Plateau, a 200 km 2 (75 mi 2) area that includes approximately 800 waste sites. Some of the inorganic and radionuclide contaminants in the deep vadose zone at the Hanford Site are at depths below the limit of direct exposure pathways, but may need to be remediated to protect groundwater. The Tri-Party Agenciesmore » (DOE, U.S. Environmental Protection Agency, and Washington State Department of Ecology) established Milestone M 015 50, which directed DOE to submit a treatability test plan for remediation of technetium-99 (Tc-99) and uranium in the deep vadose zone. These contaminants are mobile in the subsurface environment and have been detected at high concentrations deep in the vadose zone, and at some locations have reached groundwater. Testing technologies for remediating Tc-99 and uranium will also provide information relevant for remediating other contaminants in the vadose zone. A field test of desiccation is being conducted as an element of the DOE test plan published in March 2008 to meet Milestone M 015 50. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 3 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.« less
ANL site response for the DOE FY1994 information resources management long-range plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boxberger, L.M.
1992-03-01
Argonne National Laboratory`s ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory`s previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory`s Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, ``Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less
ANL site response for the DOE FY1994 information resources management long-range plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Boxberger, L.M.
1992-03-01
Argonne National Laboratory's ANL Site Response for the DOE FY1994 Information Resources Management (IRM) Long-Range Plan (ANL/TM 500) is one of many contributions to the DOE information resources management long-range planning process and, as such, is an integral part of the DOE policy and program planning system. The Laboratory has constructed this response according to instructions in a Call issued in September 1991 by the DOE Office of IRM Policy, Plans and Oversight. As one of a continuing series, this Site Response is an update and extension of the Laboratory's previous submissions. The response contains both narrative and tabular material.more » It covers an eight-year period consisting of the base year (FY1991), the current year (FY1992), the budget year (FY1993), the plan year (FY1994), and the out years (FY1995-FY1998). This Site Response was compiled by Argonne National Laboratory's Computing and Telecommunications Division (CTD), which has the responsibility to provide leadership in optimizing computing and information services and disseminating computer-related technologies throughout the Laboratory. The Site Response consists of 5 parts: (1) a site overview, describes the ANL mission, overall organization structure, the strategic approach to meet information resource needs, the planning process, major issues and points of contact. (2) a software plan for DOE contractors, Part 2B, Software Plan FMS plan for DOE organizations, (3) computing resources telecommunications, (4) telecommunications, (5) printing and publishing.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
IN 1989, Secretary of Energy James Watkins called for a fundamental change in the way US Department of Energy (DOE) meets its environmental responsibilities. Whereas DOE had long subordinated environmental concerns to the higher priority of weapons production, the Department`s mission was restructured to place less emphasis on defense-related production and much greater emphasis on sound environmental management and restoration of its weapons complex. To carry out this new mission, the Office of Environmental Restoration and Waste Management (EM) was created. Secretary Watkins further stressed that DOE`s new commitment to environmental values will be carried out under a new DOEmore » culture-one of openness, responsiveness, and accountability. The Environmental Restoration and Waste Management Five-Year Plan is the key planning document that embodies both the new DOE emphasis on environmental management and the Department`s commitment to involving the public in its planning process. Updated annually, the Five-Year Plan guides EM`s efforts to clean up DOE facilities and manage its waste -- its accomplishments, goals, and planned activities -- and reinforces DOE`s commitment to the culture change by involving the general public in its development.« less
42 CFR 59.4 - How does one apply for a family planning services grant?
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false How does one apply for a family planning services grant? 59.4 Section 59.4 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR FAMILY PLANNING SERVICES Project Grants for Family Planning Services § 59.4 How does...
42 CFR 59.4 - How does one apply for a family planning services grant?
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false How does one apply for a family planning services grant? 59.4 Section 59.4 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR FAMILY PLANNING SERVICES Project Grants for Family Planning Services § 59.4 How does...
42 CFR 59.4 - How does one apply for a family planning services grant?
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false How does one apply for a family planning services grant? 59.4 Section 59.4 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR FAMILY PLANNING SERVICES Project Grants for Family Planning Services § 59.4 How does...
42 CFR 59.4 - How does one apply for a family planning services grant?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false How does one apply for a family planning services grant? 59.4 Section 59.4 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR FAMILY PLANNING SERVICES Project Grants for Family Planning Services § 59.4 How does...
42 CFR 59.4 - How does one apply for a family planning services grant?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false How does one apply for a family planning services grant? 59.4 Section 59.4 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GRANTS GRANTS FOR FAMILY PLANNING SERVICES Project Grants for Family Planning Services § 59.4 How does...
Planning of the 12 GHz broadcasting satellite service in Region 2
NASA Astrophysics Data System (ADS)
Bowen, R. R.; Chambers, J. G.
The 12 GHz band broadcasting satellite plan formulated for Region 2 (the Americas) at the 1983 Regional Administrative Radio Conference met all requirements with a total of 1144 assigned channels. In order to achieve this high capacity (16 channels/service area), it was necessary to place some assignments at orbit locations with relatively low elevation angles and early eclipse times. This high capacity does not prevent the plan from adapting to changing technological features of broadcasting in this band as it evolves over the years, and is estimated to be more than 2.5 times larger than the capacity which would be available without taking advantage of the geographical characteristics of the region, as well as of isolation by means of spacecraft antennas.
TWRS Retrieval and Storage Mission and Immobilized Low Activity Waste (ILAW) Disposal Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
BURBANK, D.A.
This project plan has a twofold purpose. First, it provides a waste stream project plan specific to the River Protection Project (RPP) (formerly the Tank Waste Remediation System [TWRS] Project) Immobilized Low-Activity Waste (LAW) Disposal Subproject for the Washington State Department of Ecology (Ecology) that meets the requirements of Hanford Federal Facility Agreement and Consent Order (Tri-Party Agreement) Milestone M-90-01 (Ecology et al. 1994) and is consistent with the project plan content guidelines found in Section 11.5 of the Tri-Party Agreement action plan (Ecology et al. 1998). Second, it provides an upper tier document that can be used as themore » basis for future subproject line-item construction management plans. The planning elements for the construction management plans are derived from applicable U.S. Department of Energy (DOE) planning guidance documents (DOE Orders 4700.1 [DOE 1992] and 430.1 [DOE 1995a]). The format and content of this project plan are designed to accommodate the requirements mentioned by the Tri-Party Agreement and the DOE orders. A cross-check matrix is provided in Appendix A to explain where in the plan project planning elements required by Section 11.5 of the Tri-Party Agreement are addressed.« less
2016 DOE Vehicle Technologies Office Annual Merit Review
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The 2016 U.S. Department of Energy (DOE) Hydrogen and Fuel Cells Program and Vehicle Technologies Office (VTO) Annual Merit Review and Peer Evaluation Meeting (AMR) was held June 6-9, 2016, in Washington, DC. The review encompassed work done by the Hydrogen and Fuel Cells Program and VTO: 226 individual activities were reviewed for VTO, by 171 reviewers. A total of 1,044 individual review responses were received for the VTO technical reviews. The objective of the meeting was to review the accomplishments and plans for VTO over the previous 12 months, and provide an opportunity for industry, government, and academia tomore » give inputs to DOE with a structured and formal methodology. The meeting also provided attendees with a forum for interaction and technology information transfer.« less
2015 DOE Vehicle Technologies Office Annual Merit Review
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The 2015 U.S. Department of Energy (DOE) Fuel Cell Technologies Office (FCTO) and Vehicle Technologies Office (VTO) Annual Merit Review and Peer Evaluation Meeting (AMR) was held June 8-12, 2015, in Arlington, Virginia. The review encompassed all of the work done by the FCTO and the VTO: 258 individual activities were reviewed for VTO, by 170 reviewers. A total of 1,095 individual review responses were received for the VTO technical reviews. The objective of the meeting was to review the accomplishments and plans for VTO over the previous 12 months, and provide an opportunity for industry, government, and academia tomore » give inputs to DOE on the Office with a structured and formal methodology. The meeting also provided attendees with a forum for interaction and technology information transfer.« less
Code of Federal Regulations, 2014 CFR
2014-04-01
... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false How does the continuation of health plan benefits apply to a multiemployer plan that provides health plan coverage through a health benefits account... benefits apply to a multiemployer plan that provides health plan coverage through a health benefits account...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 20 Employees' Benefits 4 2013-04-01 2013-04-01 false How does the continuation of health plan benefits apply to a multiemployer plan that provides health plan coverage through a health benefits account... benefits apply to a multiemployer plan that provides health plan coverage through a health benefits account...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 20 Employees' Benefits 4 2012-04-01 2012-04-01 false How does the continuation of health plan benefits apply to a multiemployer plan that provides health plan coverage through a health benefits account... benefits apply to a multiemployer plan that provides health plan coverage through a health benefits account...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false How does the continuation of health plan benefits apply to a multiemployer plan that provides health plan coverage through a health benefits account... benefits apply to a multiemployer plan that provides health plan coverage through a health benefits account...
Defense: FY2013 Authorization and Appropriations
2012-07-13
overturn several cost- cutting initiatives incorporated in the Administration’s budget, including proposed reductions in the Air Force Reserve and the...additional $1.2 trillion, the BCA will trigger automatic reductions that would cut the Administration’s current DOD base budget plan by whatever amount is...needed to cover the defense share of the shortfall between whatever cuts Congress does agree to and the required total reduction of $2.1 trillion
SU-G-201-15: Nomogram as an Efficient Dosimetric Verification Tool in HDR Prostate Brachytherapy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liang, J; Todor, D
Purpose: Nomogram as a simple QA tool for HDR prostate brachytherapy treatment planning has been developed and validated clinically. Reproducibility including patient-to-patient and physician-to-physician variability was assessed. Methods: The study was performed on HDR prostate implants from physician A (n=34) and B (n=15) using different implant techniques and planning methodologies. A nomogram was implemented as an independent QA of computer-based treatment planning before plan execution. Normalized implant strength (total air kerma strength Sk*t in cGy cm{sup 2} divided by prescribed dose in cGy) was plotted as a function of PTV volume and total V100. A quadratic equation was used tomore » fit the data with R{sup 2} denoting the model predictive power. Results: All plans showed good target coverage while OARs met the dose constraint guidelines. Vastly different implant and planning styles were reflected on conformity index (entire dose matrix V100/PTV volume, physician A implants: 1.27±0.14, physician B: 1.47±0.17) and PTV V150/PTV volume ratio (physician A: 0.34±0.09, physician B: 0.24±0.07). The quadratic model provided a better fit for the curved relationship between normalized implant strength and total V100 (or PTV volume) than a simple linear function. Unlike the normalized implant strength versus PTV volume nomogram which differed between physicians, a unique quadratic model based nomogram (Sk*t)/D=−0.0008V2+0.0542V+1.1185 (R{sup 2}=0.9977) described the dependence of normalized implant strength on total V100 over all the patients from both physicians despite two different implant and planning philosophies. Normalized implant strength - total V100 model also generated less deviant points distorting the smoothed ones with a significantly higher correlation. Conclusion: A simple and universal, excel-based nomogram was created as an independent calculation tool for HDR prostate brachytherapy. Unlike similar attempts, our nomogram is insensitive to implant style and does not rely on reproducing dose calculations using TG-43 formalism, thus making it a truly independent check.« less
Natural and accelerated bioremediation research program plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
This draft plan describes a ten-year program to develop the scientific understanding needed to harness and develop natural and enhanced biogeochemical processes to bioremediate contaminated soils, sediments and groundwater at DOE facilities. The Office of Health and Environmental Research (OHER) developed this program plan, with advice and assistance from DOE`s Office of Environmental Management (EM). The program builds on OHER`s tradition of sponsoring fundamental research in the life and environmental sciences and was motivated by OHER`s and Office of Energy Research`s (OER`s) commitment to supporting DOE`s environmental management mission and the belief that bioremediation is an important part of themore » solution to DOE`s environmental problems.« less
Environmental restoration and waste management five year plan, fiscal years 1994--1998
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
In March 1989, Secretary of Energy James D. Watkins outlined his vision for a changed Department of Energy (DOE) culture. This culture is one of envirorunental responsibility, increased knowledge and involvement in environmental management, a new openness to public input, and overall accountability to the Nation for its actions. Secretary Watkins also requested all the near-term activities necessary to bring DOEactivities into compliance with all applicable environmental requirements to be detailed in one plan. The Five-Year Plan was to be based on a bottom up'' approach to planning by using Activity Data Sheets to collect financial and technical information atmore » the installation level. Over the past three years, the Five-Year Plan has evolved into the primary planning tool for the DOE Environmental Restoration and Waste Management Program, looking beyond the current three-year Federal budget horizon. The FY 1994--1998 Five-Year Plan demonstrates DOE's commitment to a culture based on the principles of openness, responsiveness, and accountability; reports on the progress made in carrying out DOE's environmental mission; identifies what must be accomplished during a five-year planning period; and describes strategies for achieving critical program objectives. This plan represents another step towards the implementation of the culture change Secretary Watkins envisioned. The Five-Year Plan is not exclusively focused on near-term activities. Italso expresses the DOE commitment to a 30-year goal for the cleanup of the 1989 inventory of inactive sites. The FY 1994--1998 Five-Year Plan reiterates the DOE commitment to meeting this and other important environmental goals.« less
Unicompartmental Knee Arthroplasty: Does a Selection Bias Exist?
Howell, Robert E; Lombardi, Adolph V; Crilly, Ryan; Opolot, Shem; Berend, Keith R
2015-10-01
Unicompartmental knee arthroplasty (UKA) is a minimally invasive option reported to allow a more rapid recovery and better patient outcomes. However, whether these outcomes are related to selection bias has not been fully investigated. This study examines whether a bias existed in selection of UKA candidates. We compared outcomes of patients who were scheduled for UKA but had the plan changed intraoperatively to total knee arthroplasty (TKA) to two randomly selected contemporaneous control groups: 1) patients planned as UKA who received UKA and 2) patients planned as TKA who received TKA. Our results not only showed a selection bias existed, but also showed patients converted to TKA intraoperatively had similar clinical results to patients receiving UKAs and better results than patients originally scheduled for TKA. Copyright © 2015 Elsevier Inc. All rights reserved.
Environmental restoration and waste management: Five-year plan, Fiscal Years 1992--1996
DOE Office of Scientific and Technical Information (OSTI.GOV)
Middleman, L.I.
1990-06-01
This document reflects DOE's fulfillment of a major commitment of the Environmental Restoration and Waste Management Five-Year Plan: reorganization to create an Office of Environmental Restoration and Waste Management (EM) responsible for the consolidated environmental management of nuclear-related facilities and sites formerly under the Assistant Secretaries for Defense Programs and Nuclear Energy and the Director of the Office of Energy Research. The purposes of this Plan for FY 1992--1996 are to measure progress in meeting DOE's compliance, cleanup, and waste management agenda; to incorporate a revised and condensed version of the Draft Research Development, Demonstration, Testing, and Evaluation (RDDT E)more » Plan (November 1989) to describe DOE's process for developing the new technologies critically needed to solve its environmental problems; to show DOE's current strategy and planned activities through FY 1996, including reasons for changes required to meet compliance and cleanup commitments; and to increase the involvement of other agencies and the public in DOE's planning.« less
Comprehensive implementation plan for the DOE defense buried TRU- contaminated waste program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Everette, S.E.; Detamore, J.A.; Raudenbush, M.H.
1988-02-01
In 1970, the US Atomic Energy Commission established a transuranic'' (TRU) waste classification. Waste disposed of prior to the decision to retrievably store the waste and which may contain TRU contamination is referred to as buried transuranic-contaminated waste'' (BTW). The DOE reference plan for BTW, stated in the Defense Waste Management Plan, is to monitor it, to take such remedial actions as may be necessary, and to re-evaluate its safety as necessary or in about 10-year periods. Responsibility for management of radioactive waste and byproducts generated by DOE belongs to the Secretary of Energy. Regulatory control for these sites containingmore » mixed waste is exercised by both DOE (radionuclides) and EPA (hazardous constituents). Each DOE Operations Office is responsible for developing and implementing plans for long-term management of its radioactive and hazardous waste sites. This comprehensive plan includes site-by-site long-range plans, site characteristics, site costs, and schedules at each site. 13 figs., 15 tabs.« less
50 CFR 86.130 - What does the State program plan do?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false What does the State program plan do? 86.130 Section 86.130 Wildlife and Fisheries UNITED STATES FISH AND WILDLIFE SERVICE, DEPARTMENT OF THE... GRANT (BIG) PROGRAM How States Will Complete the State Program Plans § 86.130 What does the State...
Comprehensive integrated planning: A process for the Oak Ridge Reservation, Oak Ridge, Tennessee
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-05-01
The Oak Ridge Comprehensive Integrated Plan is intended to assist the US Department of Energy (DOE) and contractor personnel in implementing a comprehensive integrated planning process consistent with DOE Order 430.1, Life Cycle Asset Management and Oak Ridge Operations Order 430. DOE contractors are charged with developing and producing the Comprehensive Integrated Plan, which serves as a summary document, providing information from other planning efforts regarding vision statements, missions, contextual conditions, resources and facilities, decision processes, and stakeholder involvement. The Comprehensive Integrated Plan is a planning reference that identifies primary issues regarding major changes in land and facility use andmore » serves all programs and functions on-site as well as the Oak Ridge Operations Office and DOE Headquarters. The Oak Ridge Reservation is a valuable national resource and is managed on the basis of the principles of ecosystem management and sustainable development and how mission, economic, ecological, social, and cultural factors are used to guide land- and facility-use decisions. The long-term goals of the comprehensive integrated planning process, in priority order, are to support DOE critical missions and to stimulate the economy while maintaining a quality environment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Holland, R.C.
This Environmental Monitoring Plan was written to fulfill the requirements of Department of Energy (DOE) Order 5400.1 and DOE Environmental Regulatory Guide DOE/EH 0173T. This Plan documents the background, organizational structure, and methods used for effluent monitoring and environmental surveillance at Sandia National Laboratories/California. The design, rationale, and historical results of the environmental monitoring system are discussed in detail. Throughout the Plan, recommendations for improvements to the monitoring system are made. 52 refs., 10 figs., 12 tabs.
Decision-making and planning in full recovery of anorexia nervosa.
Lindner, Susanne E; Fichter, Manfred M; Quadflieg, Norbert
2012-11-01
Based on findings of persisting neuropsychological impairments in women recovered from anorexia nervosa (rec AN), this study examined decision-making and planning, for achieving a desired goal, as central executive functions in a large sample of rec AN. The definition of recovery included physiological, behavioral, and psychological variables. A total of 100 rec AN women were compared to 100 healthy women, 1:1 matched for age and educational level. Decision-making was assessed with the Iowa Gambling Task and planning with the Tower of London. Expert interviews and self-ratings were used for assessing the inclusion/exclusion criteria and control variables. Compared to healthy controls, rec AN women were better in decision-making and worse in planning even after considering control variables. This study does not support results from other studies showing that rec AN participants perform better in decision-making. Results from this study show that planning is impaired even after full recovery from AN. Copyright © 2012 Wiley Periodicals, Inc.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnson, D.H.
In 1992 there were over 6,000 employees involved in defense related activities at the Y-12 Plant. By late 1994 the plant had undergone a dramatic change in operations including a reduction of the work force to less than 4,000 employees. That this major downsizing was accomplished without a layoff is a tribute to the combined efforts of the Y-12 employees, union leadership, the DOE, Martin Marietta and local and state governments. The keys to the success are: (1) the end of the Cold War and the potential impact was recognized early and a plan of action was developed and implemented,more » the plan was based on a total reorientation of the historical role and mode of operation of the plant; (2) everyone who had an interest in the outcome was invited to join in the planning; (3) the plan was developed and implemented as if no barriers to success existed; (4) opening about one-third of the classified portion of the Y-12 Plant as the initial activity was critical to the success of the plan. The historical opening of the gates was a major factor in convincing employees and a skeptical public that change could and would occur. As the debate on the future of the DOE weapons complex evolves it is clear that the Y-12 Plant will be a major contributor to improving productivity and the competitiveness of current and future industry in Tennessee and the country while continuing to provide unique expertise to support the nation`s nuclear weapons program.« less
Mahmoudi, Elham; Tarraf, Wassim; Maroukis, Brianna L; Levy, Helen G
2016-10-01
Large and persistent racial/ethnic disparities exist in diabetes care. Considering the rapid rate of growth of Medicare Managed Care (MMC) plans among minority populations, our aim was to investigate whether disparities in diabetes management and healthcare expenditures are smaller in MMC versus Medicare fee-for-service (MFFS) plans. We hypothesized that racial/ethnic disparities in diabetes care and in health expenditures would be less pronounced in MMC compared with MFFS plans. Nationally representative data from the 2006 to 2011 Medical Expenditure Panel Survey on white, African American, and Hispanic seniors with diabetes were analyzed. We examined 4 measures of diabetes care-regular foot check, eye exam, cholesterol check, and flu vaccine-and total and out-of-pocket (OOP) healthcare expenditures. We implemented the Institute of Medicine's definition of disparity, applied propensity score weighting to adjust for potential differential selection, and used a difference-in-differences generalized linear framework to estimate outcome measures. For African Americans, MMC was associated with a $1183 (P <.036) reduction and a $547 (P <.001) increase in disparities in total and OOP healthcare expenditures, respectively. For Hispanics, disparities in foot exam, flu shot, and cholesterol check decreased by 5, 10, and 7 percentage points (P <.001); additionally, disparities in total and OOP healthcare expenditures were reduced by $3588 and $276 (P <.001), respectively. MMC plans spend less on everyone, including whites. Hispanic/white disparities in diabetes management and healthcare expenditures were smaller in MMC than in MFFS plans. African American/white disparities were not consistently larger in 1 setting than the other.
ERIC Educational Resources Information Center
Bonestroo, Wilco J.; de Jong, Ton
2012-01-01
Is actively planning one's learning route through a learning domain beneficial for learning? Moreover, can learners accurately judge the extent to which planning has been beneficial for them? This study examined the effects of active planning on learning. Participants received a tool in which they created a learning route themselves before…
20 CFR 641.360 - How does the State Plan relate to the equitable distribution (ED) report?
Code of Federal Regulations, 2010 CFR
2010-04-01
... ADMINISTRATION, DEPARTMENT OF LABOR PROVISIONS GOVERNING THE SENIOR COMMUNITY SERVICE EMPLOYMENT PROGRAM The State Senior Employment Services Coordination Plan § 641.360 How does the State Plan relate to the...
Strategic planning as a focus for continuous improvement. A case study
NASA Technical Reports Server (NTRS)
Oneill, John W.; Gordon-Winkler, Lyn
1992-01-01
What do most of the successful people and organizations in our world have in common? Instead of worrying about the future, they work to create it. They have a plan, or a vision of what they want to accomplish and they focus their efforts on success. Strategic planning has been described as a disciplined, ongoing process to produce fundamental decisions and actions that shape what an organization is, what it does, and how it will respond to a changing environment. This case study discussion will evaluate the relationship between strategic planning and Total Quality Management (TQM), or continuous improvement, through the experience of the NASA Johnson Space Center in developing a strategy for the future. That experience clearly illustrates the value of strategic planning in setting the framework and establishing the overall thrust of continuous improvement initiatives. Equally significant, the fundamentals of a quality culture such as strong customer and supplier partnerships, participative involvement, open communications, and ownership were essential in overcoming the challenges inherent in the planning process. A reinforced management commitment to the quality culture was a clear, long-term benefit.
Strategic planning as a focus for continuous improvement. A case study
NASA Astrophysics Data System (ADS)
Oneill, John W.; Gordon-Winkler, Lyn
What do most of the successful people and organizations in our world have in common? Instead of worrying about the future, they work to create it. They have a plan, or a vision of what they want to accomplish and they focus their efforts on success. Strategic planning has been described as a disciplined, ongoing process to produce fundamental decisions and actions that shape what an organization is, what it does, and how it will respond to a changing environment. This case study discussion will evaluate the relationship between strategic planning and Total Quality Management (TQM), or continuous improvement, through the experience of the NASA Johnson Space Center in developing a strategy for the future. That experience clearly illustrates the value of strategic planning in setting the framework and establishing the overall thrust of continuous improvement initiatives. Equally significant, the fundamentals of a quality culture such as strong customer and supplier partnerships, participative involvement, open communications, and ownership were essential in overcoming the challenges inherent in the planning process. A reinforced management commitment to the quality culture was a clear, long-term benefit.
One Size Does Not Fit All: How Acquisition Fails the Joint Force Commander
2010-04-02
Campaign Planning and Strategy . The contents of this paper reflect my own personal views and are not necessarily endorsed by the Joint Forces Staff...one-size-fits-all‖ approach has insidiously led to a flawed aircraft acquisition strategy that allows unacceptable risk to combat effectiveness in an...and 78% of the total US tactical aviation fleet. This ―one-size-fits-all‖ approach has insidiously led to a flawed aircraft acquisition strategy
Oyugi, Boniface; Kioko, Urbanus; Kaboro, Stephen Mbugua; Gikonyo, Shadrack; Okumu, Clarice; Ogola-Munene, Sarah; Kalsi, Shaminder; Thiani, Simon; Korir, Julius; Odundo, Paul; Baltazaar, Billy; Ranji, Moses; Muraguri, Nicholas; Nzioka, Charles
2017-03-27
The study seeks to evaluate the difference in access of long-term family planning (LTFP) methods among the output based approach (OBA) and non-OBA clients within the OBA facility. The study utilises a quasi experimental design. A two tailed unpaired t-test with unequal variance is used to test for the significance variation in the mean access. The difference in difference (DiD) estimates of program effect on long term family planning methods is done to estimate the causal effect by exploiting the group level difference on two or more dimensions. The study also uses a linear regression model to evaluate the predictors of choice of long-term family planning methods. Data was analysed using SPSS version 17. All the methods (Bilateral tubal ligation-BTL, Vasectomy, intrauterine contraceptive device -IUCD, Implants, and Total or combined long-term family planning methods -LTFP) showed a statistical significant difference in the mean utilization between OBA versus non-OBA clients. The difference in difference estimates reveal that the difference in access between OBA and non OBA clients can significantly be attributed to the implementation of the OBA program for intrauterine contraceptive device (p = 0.002), Implants (p = 0.004), and total or combined long-term family planning methods (p = 0.001). The county of residence is a significant determinant of access to all long-term family planning methods except vasectomy and the year of registration is a significant determinant of access especially for implants and total or combined long-term family planning methods. The management level and facility type does not play a role in determining the type of long-term family planning method preferred; however, non-governmental organisations (NGOs) as management level influences the choice of all methods (Bilateral tubal ligation, intrauterine contraceptive device, Implants, and combined methods) except vasectomy. The adjusted R 2 value, representing the percentage of the variance explained by various models, is larger than 18% for implants and total or combined long-term family planning. The study showed that the voucher services in Kenya has been effective in providing long-term family planning services and improving access of care provided to women of reproductive age. Therefore, voucher scheme can be used as a tool for bridging the gap of unmet needs of family planning in Kenya and could potentially be more effective if rolled out to other counties.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Irene Farnham
This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurancemore » Project Plan, Nevada Test Site, Nevada, Revision 4.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
IN 1989, Secretary of Energy James Watkins called for a fundamental change in the way US Department of Energy (DOE) meets its environmental responsibilities. Whereas DOE had long subordinated environmental concerns to the higher priority of weapons production, the Department's mission was restructured to place less emphasis on defense-related production and much greater emphasis on sound environmental management and restoration of its weapons complex. To carry out this new mission, the Office of Environmental Restoration and Waste Management (EM) was created. Secretary Watkins further stressed that DOE's new commitment to environmental values will be carried out under a new DOEmore » culture-one of openness, responsiveness, and accountability. The Environmental Restoration and Waste Management Five-Year Plan is the key planning document that embodies both the new DOE emphasis on environmental management and the Department's commitment to involving the public in its planning process. Updated annually, the Five-Year Plan guides EM's efforts to clean up DOE facilities and manage its waste -- its accomplishments, goals, and planned activities -- and reinforces DOE's commitment to the culture change by involving the general public in its development.« less
Patient specific instrumentation in total knee arthroplasty: a state of the art
Mattei, Lorenzo; Pellegrino, Pietro; Bistolfi, Alessandro; Castoldi, Filippo
2016-01-01
Patient specific instrumentation (PSI) is a modern technique in total knee arthroplasty (TKA) aiming to facilitate the implant of the prosthesis. The customized cutting blocks of the PSI are generated from pre-operative three-dimensional model, using computed tomography (CT) or magnetic resonance imaging (MRI). A correct surgical plan is mandatory for a good surgical implant. The PSI guide takes into account any slight deformities or osteophytes and applies preoperative planning for bone resection, using the pre-determined implant size, position, and rotation. The apparent benefits of this technology are that neutral postoperative alignment is more reproducible, surgical time is decreased, and the entire procedure results more efficient and cost-effective. The use of PSI is indicated when advanced osteoarthritis, severe pain, and limited function/walking ability are present, such as in a standard instrumentation TKA. In addition to that, PSI finds its indication when intra-medullary guides cannot be used. For example, when there is a post-traumatic femoral deformity. Large debates have taken place about this topic during the last years and, at the moment, there is no consensus in literature regarding the accuracy and reliability of PSI as many studies have shown controversial and inconsistent results. Literature does not suggest PSI techniques as a gold standard in TKA, and therefore it cannot be recommended as a standard technique in standard, not complicated primary TKA. Moreover, literature does not underline any improvement in components alignment, surgical time, blood loss or functional outcomes. Nevertheless, many patients who underwent TKA suffered a previous trauma. In case of deformities, like femoral or tibial fractures healed with a malalignment, preoperative planning may result difficult, and some intra-operative technical difficulties can occur, such as the use of intra-medullar rod. In these selected cases, PSIs may be very useful to avoid errors in alignment and planning. PMID:27162776
Proposed standby gasoline rationing plan: public comments
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1978-12-01
Under the proposed plan, DOE would allocate ration rights (rights to purchase gasoline) to owners of registered vehicles. All vehicles in a given class would receive the same entitlement. Essential services would receive supplemental allotments of ration rights as pririty firms. Once every 3 months, ration checks would be mailed out to all vehicle registrants, allotting them a certain amount of ration rights. These checks would then be cashed at Coupon Issuance Points, where the bearer would receive ration coupons to be used at gasoline stations. Large users of gasoline could deposit their allotment checks in accounts at ration banks.more » Coupons or checks would be freely exchangeable in a white market. A certain percentage of the gasoline supply would be set aside in reserve for use in national emergencies. When the plan was published in the Federal Register, public comments were requested. DOE also solicited comments from private citizens, public interest groups, business and industry, state and local governments. A total of 1126 responses were reveived and these are analyzed in this paper. The second part of the report describes how the comments were classified, and gives a statistical breakdown of the major responses. The last section is a discussion and analysis of theissue raised by commenting agencies, firms, associations, and individuals. (MCW)« less
34 CFR 403.33 - What procedures does a State use to submit its State plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... TECHNOLOGY EDUCATION PROGRAM How Does A State Apply for a Grant? § 403.33 What procedures does a State use to... 34 Education 3 2010-07-01 2010-07-01 false What procedures does a State use to submit its State plan? 403.33 Section 403.33 Education Regulations of the Offices of the Department of Education...
Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective.
Türkay, Metin; Saraçoğlu, Öztürk; Arslan, Mehmet Can
2016-01-01
Supply chain management that considers the flow of raw materials, products and information has become a focal issue in modern manufacturing and service systems. Supply chain management requires effective use of assets and information that has far reaching implications beyond satisfaction of customer demand, flow of goods, services or capital. Aggregate planning, a fundamental decision model in supply chain management, refers to the determination of production, inventory, capacity and labor usage levels in the medium term. Traditionally standard mathematical programming formulation is used to devise the aggregate plan so as to minimize the total cost of operations. However, this formulation is purely an economic model that does not include sustainability considerations. In this study, we revise the standard aggregate planning formulation to account for additional environmental and social criteria to incorporate triple bottom line consideration of sustainability. We show how these additional criteria can be appended to traditional cost accounting in order to address sustainability in aggregate planning. We analyze the revised models and interpret the results on a case study from real life that would be insightful for decision makers.
Sustainability in Supply Chain Management: Aggregate Planning from Sustainability Perspective
Türkay, Metin; Saraçoğlu, Öztürk; Arslan, Mehmet Can
2016-01-01
Supply chain management that considers the flow of raw materials, products and information has become a focal issue in modern manufacturing and service systems. Supply chain management requires effective use of assets and information that has far reaching implications beyond satisfaction of customer demand, flow of goods, services or capital. Aggregate planning, a fundamental decision model in supply chain management, refers to the determination of production, inventory, capacity and labor usage levels in the medium term. Traditionally standard mathematical programming formulation is used to devise the aggregate plan so as to minimize the total cost of operations. However, this formulation is purely an economic model that does not include sustainability considerations. In this study, we revise the standard aggregate planning formulation to account for additional environmental and social criteria to incorporate triple bottom line consideration of sustainability. We show how these additional criteria can be appended to traditional cost accounting in order to address sustainability in aggregate planning. We analyze the revised models and interpret the results on a case study from real life that would be insightful for decision makers. PMID:26807848
Closure Plan for the Area 5 Radioactive Waste Management Site at the Nevada Test Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Management
The Area 5 Radioactive Waste Management Site (RMWS) at the Nevada Test Site (NTS) is managed and operated by National Security Technologies, LLC (NSTec), for the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This document is the first update of the preliminary closure plan for the Area 5 RWMS at the NTS that was presented in the Integrated Closure and Monitoring Plan (DOE, 2005a). The major updates to the plan include a new closure schedule, updated closure inventory, updated site and facility characterization data, the Title II engineering cover design, and the closure processmore » for the 92-Acre Area of the RWMS. The format and content of this site-specific plan follows the Format and Content Guide for U.S. Department of Energy Low-Level Waste Disposal Facility Closure Plans (DOE, 1999a). This interim closure plan meets closure and post-closure monitoring requirements of the order DOE O 435.1, manual DOE M 435.1-1, Title 40 Code of Federal Regulations (CFR) Part 191, 40 CFR 265, Nevada Administrative Code (NAC) 444.743, and Resource Conservation and Recovery Act (RCRA) requirements as incorporated into NAC 444.8632. The Area 5 RWMS accepts primarily packaged low-level waste (LLW), low-level mixed waste (LLMW), and asbestiform low-level waste (ALLW) for disposal in excavated disposal cells.« less
The Power of Investigating: Guiding Authentic Assessments
ERIC Educational Resources Information Center
McGough, Julie V.; Nyberg, Lisa M.
2017-01-01
Children want to explore, dig, build, play, and wonder. To do this they need to touch, feel, see, observe, listen, manipulate, plan, and create. How does a teacher build and maintain a learning environment that will help students investigate meaningful questions? How does a teacher plan and manage ongoing investigations? How does a teacher use…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-09-01
The Department of Energy`s (DOE`s) planning for the disposal of greater-than-Class C low-level radioactive waste (GTCC LLW) requires characterization of the waste. This report estimates volumes, radionuclide activities, and waste forms of GTCC LLW to the year 2035. It groups the waste into four categories, representative of the type of generator or holder of the waste: Nuclear Utilities, Sealed Sources, DOE-Held, and Other Generator. GTCC LLW includes activated metals (activation hardware from reactor operation and decommissioning), process wastes (i.e., resins, filters, etc.), sealed sources, and other wastes routinely generated by users of radioactive material. Estimates reflect the possible effect thatmore » packaging and concentration averaging may have on the total volume of GTCC LLW. Possible GTCC mixed LLW is also addressed. Nuclear utilities will probably generate the largest future volume of GTCC LLW with 65--83% of the total volume. The other generators will generate 17--23% of the waste volume, while GTCC sealed sources are expected to contribute 1--12%. A legal review of DOE`s obligations indicates that the current DOE-Held wastes described in this report will not require management as GTCC LLW because of the contractual circumstances under which they were accepted for storage. This report concludes that the volume of GTCC LLW should not pose a significant management problem from a scientific or technical standpoint. The projected volume is small enough to indicate that a dedicated GTCC LLW disposal facility may not be justified. Instead, co-disposal with other waste types is being considered as an option.« less
Laboratory Directed Research and Development Program FY2011
DOE Office of Scientific and Technical Information (OSTI.GOV)
none, none
2012-04-27
Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2011 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). Going forward in FY 2012, the LDRD program also supports themore » Goals codified in the new DOE Strategic Plan of May, 2011. The LDRD program also supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the Office of Science Program Offices, such as LDRD projects germane to new research facility concepts and new fundamental science directions. Brief summares of projects and accomplishments for the period for each division are included.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Green,T.
This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) updates the 2003 plan incorporating changes necessary to comply with DOE Order 450.1 and DOE P 450.4, Federal Wildland Fire Management Policy and Program Review; Wildland and Prescribed Fire Management Policy and implementation Procedures Reference Guide. This current plan incorporates changes since the original draft of the FMP that result from new policies on the national level. This update also removes references and dependence on the U.S. Fish & Wildlife Service and Department of the Interior, fully transitioning Wildland Fire Management responsibilities to BNL. The Department of Energy policymore » for managing wildland fires requires that all areas, managed by the DOE and/or its various contractors, that can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wild fire, operational, and prescribed fires. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, 'prescribed' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened, and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of the DOE and BNL. This Fire Management Plan is presented in a format that coverers all aspects specified by DOE guidance documents which are based on the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel. The BNL Fire Department is the lead on wildfire suppression. However, the BNL Natural Resource Manager will be assigned to all wildland fires as technical resource advisor.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bechtel Jacobs, Raymer J.E.
2008-06-12
In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2003. The purpose of this agreement is to define a streamlined decision-making process to facilitatemore » the accelerated implementation of cleanup, to resolve ORR milestone issues, and to establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. The disposal of the K-1015 Laundry Pit waste will be executed in accordance with the 'Record of Decision for Soil, Buried Waste, and Subsurface Structure Actions in Zone, 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOB/ORAH-2161&D2) and the 'Waste Handling Plan for the Consolidated Soil and Waste Sites with Zone 2, East Tennessee Technology Park, Oak Ridge, Tennessee' (DOE/OR/01-2328&D1). This waste lot consists of a total of approximately 50 cubic yards of waste that will be disposed at the Environmental Management Waste Management Facility (EMWMF) as non-containerized waste. This material will be sent to the EMWMF in dump trucks. This profile is for the K-1015-A Laundry Pit and includes debris (e.g., concrete, metal rebar, pipe), incidental soil, plastic and wood, and secondary waste (such as plastic sheeting, hay bales and other erosion control materials, wooden pallets, contaminated equipment, decontamination materials, etc.).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seigler, R.S.; Luttrell, L.J.
Aircraft hazards were evaluated to determine the total annual probability of an aircraft crash occurring at any structure located on the US Department of Energy (DOE) reservation in Oak Ridge, Tennessee. This report documents the use of an accepted methodology for calculating the probability of an aircraft crash as applied to the three Oak Ridge plant sites including the adjoining facilities. Based on the data contained herein, the evaluation concluded that the probability of an aircraft crash occurrence at a single facility is generally considered ``not credible`` as defined in DOE/OR-901. Additionally, reevaluation of probabilities would be necessary if significantmore » changes were made to local air traffic. The probability of an aircraft crash could increase as a result of the opening of any new airport or heliport in the vicinity; a greater volume of air traffic from McGhee Tyson airport in Knoxville, should the airport status change from feeder airport to hub airport; the rerouting of commercial and/or military flights at the McGhee Tyson airport; and finally, a change in direction or the addition of a federal airway. At one time, DOE planned to establish a zone of prohibited airspace over the Y-12 plant; if the plans are enacted in the future, the probability of an aircraft crash at the Y-12 plant could decrease. Pilots since have been voluntarily requested not to fly below 3000 feet over the Y-12 plant. Also, the Federal Aviation Administration plans to reroute air traffic in the spring of 1993 on federal airway V16. However, the section of V16 which traverses the three plant sites and five adjoining facilities will not be altered. If this plan is implemented, the air traffic over the Oak Ridge facilities would not be affected significantly, and the probability of an aircraft crash as determined herein would be unchanged.« less
The U.S. Department of Energy's Carlsbad Field Office (DOE/CBFO) provided the U.S. Environmental Protection Agency (EPA) this Notification of Planned Change to accept remote-handled (RH) transuranic (TRU) waste at the Waste Isolation Pilot Plant (WIPP).
Koonin, Steve
2018-01-04
In this video the DOE Under Secretary for Science, Steve Koonin, opened the 2011 EFRC Summit and Forum with welcoming remarks and an introduction of the keynote address. The 2011 EFRC Summit and Forum brought together the EFRC community and science and policy leaders from universities, national laboratories, industry and government to discuss "Science for our Nation's Energy Future." In August 2009, the Office of Science established 46 Energy Frontier Research Centers. The EFRCs are collaborative research efforts intended to accelerate high-risk, high-reward fundamental research, the scientific basis for transformative energy technologies of the future. These Centers involve universities, national laboratories, nonprofit organizations, and for-profit firms, singly or in partnerships, selected by scientific peer review. They are funded at $2 to $5 million per year for a total planned DOE commitment of $777 million over the initial five-year award period, pending Congressional appropriations. These integrated, multi-investigator Centers are conducting fundamental research focusing on one or more of several âgrand challengesâ and use-inspired âbasic research needsâ recently identified in major strategic planning efforts by the scientific community. The purpose of the EFRCs is to integrate the talents and expertise of leading scientists in a setting designed to accelerate research that transforms the future of energy and the environment.
FY 95 engineering work plan for the design reconstitution implementation action plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bigbee, J.D.
Design reconstitution work is to be performed as part of an overall effort to upgrade Configuration Management (CM) at TWRS. WHC policy is to implement a program that is compliant with DOE-STD-1073-93, Guide for Operational Configuration Management Program. DOE-STD-1073 requires an adjunct program for reconstituting design information. WHC-SD-WM-CM-009, Design Reconstitution Program Plan for Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System, is the TWRS plan for meeting DOE-STD-1073 design reconstitution requirements. The design reconstitution plan is complex requiring significant time and effort for implementation. In order to control costs, and integrate the work into other TWRS activities,more » a Design Reconstitution Implementation Action Plan (DR IAP) will be developed, and approved by those organizations having ownership or functional interest in this activity.« less
Fiscal Year 2013 Trails Management Program Mitigation Action Plan Annual Report, October 2013
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pava, Daniel S.
This Trails Management Program Mitigation Action Plan Annual Report (Trails MAPAR) has been prepared for the Department of Energy (DOE)/National Nuclear Security Administration (NNSA) as part of implementing the 2003 Final Environmental Assessment for the Proposed Los Alamos National Laboratory Trails Management Program (DOE 2003). The Trails Mitigation Action Plan (MAP) is now a part of the Site-Wide Environmental Impact Statement for the Continued Operation of Los Alamos National Laboratory (DOE/EIS 0380) Mitigation Action Plan (2008 SWEIS MAP) (DOE 2008). The MAP provides guidance for the continued implementation of the Trails Management Program at Los Alamos National Laboratory (LANL) andmore » integration of future mitigation actions into the 2008 SWEIS MAP to decrease impacts associated with recreational trails use at LANL. This eighth MAPAR includes a summary of Trails Management Program activities and actions during Fiscal Year (FY) 2013, from October 2012 through September 2013.« less
Public Access Policy and Communications | DOE PAGES
Close Clear All Find DOE PAGES Public Access Policy and Communications Public Access Policy and Communications 7/24/14 Department of Energy Public Access Plan DOE Public Access Plan 2/22/13 White House Office Information (ICSTI) Insights article Public Access at the United States Department of Energy (1,011 KB), by
Oak Ridge reservation land-use plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bibb, W. R.; Hardin, T. H.; Hawkins, C. C.
1980-03-01
This study establishes a basis for long-range land-use planning to accommodate both present and projected DOE program requirements in Oak Ridge. In addition to technological requirements, this land-use plan incorporates in-depth ecological concepts that recognize multiple uses of land as a viable option. Neither environmental research nor technological operations need to be mutually exclusive in all instances. Unique biological areas, as well as rare and endangered species, need to be protected, and human and environmental health and safety must be maintained. The plan is based on the concept that the primary use of DOE land resources must be to implementmore » the overall DOE mission in Oak Ridge. This document, along with the base map and overlay maps, provides a reasonably detailed description of the DOE Oak Ridge land resources and of the current and potential uses of the land. A description of the land characteristics, including geomorphology, agricultural productivity and soils, water courses, vegetation, and terrestrial and aquatic animal habitats, is presented to serve as a resource document. Essentially all DOE land in the Oak Ridge area is being fully used for ongoing DOE programs or has been set aside as protected areas.« less
BROOKHAVEN NATIONAL LABORATORY INSTITUTIONAL PLAN FY2003-2007.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This document presents the vision for Brookhaven National Laboratory (BNL) for the next five years, and a roadmap for implementing that vision. Brookhaven is a multidisciplinary science-based laboratory operated for the U.S. Department of Energy (DOE), supported primarily by programs sponsored by the DOE's Office of Science. As the third-largest funding agency for science in the U.S., one of the DOE's goals is ''to advance basic research and the instruments of science that are the foundations for DOE's applied missions, a base for U.S. technology innovation, and a source of remarkable insights into our physical and biological world, and themore » nature of matter and energy'' (DOE Office of Science Strategic Plan, 2000 http://www.osti.gov/portfolio/science.htm). BNL shapes its vision according to this plan.« less
Idaho National Laboratory Site Pollution Prevention Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
E. D. Sellers
2007-03-01
It is the policy of the Department of Energy (DOE) that pollution prevention and sustainable environmental stewardship will be integrated into DOE operations as a good business practice to reduce environmental hazards, protect environmental resources, avoid pollution control costs, and improve operational efficiency and mission sustainability. In furtherance of this policy, DOE established five strategic, performance-based Pollution Prevention (P2) and Sustainable Environmental Stewardship goals and included them as an attachment to DOE O 450.1, Environmental Protection Program. These goals and accompanying strategies are to be implemented by DOE sites through the integration of Pollution Prevention into each site's Environmental Managementmore » System (EMS). This document presents a P2 and Sustainability Program and corresponding plan pursuant to DOE Order 450.1 and DOE O 435.1, Radioactive Waste Management. This plan is also required by the state of Idaho, pursuant to the Resource Conservation and Recovery Act (RCRA) partial permit. The objective of this document is to describe the Idaho National Laboratory (INL) Site P2 and Sustainability Program. The purpose of the program is to decrease the environmental footprint of the INL Site while providing enhanced support of its mission. The success of the program is dependent on financial and management support. The signatures on the previous page indicate INL, ICP, and AMWTP Contractor management support and dedication to the program. P2 requirements have been integrated into working procedures to ensure an effective EMS as part of an Integrated Safety Management System (ISMS). This plan focuses on programmatic functions which include environmentally preferable procurement, sustainable design, P2 and Sustainability awareness, waste generation and reduction, source reduction and recycling, energy management, and pollution prevention opportunity assessments. The INL Site P2 and Sustainability Program is administratively managed by the INL Site P2 Coordinator. Development and maintenance of this overall INL Site plan is ultimately the responsibility of DOE-ID. This plan is applicable to all INL Site contractors except those at the Naval Reactors Facility.« less
Oak Ridge National Laboratory Waste Management Plan, fiscal year 1994. Revision 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Turner, J.W.
1993-12-01
US Department of Energy (DOE) Order 5820.2A was promulgated in final form on September 26, 1988. The order requires heads of field organizations to prepare and to submit updates on the waste management plans for all operations under their purview according to the format in Chap. 6, {open_quotes}Waste Management Plan Outline.{close_quotes} These plans are to be submitted by the DOE Oak Ridge Operations Office (DOE-ORO) in December of each year and distributed to the DP-12, ES&H-1, and other appropriate DOE Headquarters (DOE-HQ) organizations for review and comment. This document was prepared in response to this requirement for fiscal year (FY)more » 1994. The Oak Ridge National Laboratory (ORNL) waste management mission is reduction, collection, storage, treatment, and disposal of DOE wastes, generated primarily in pursuit of ORNL missions, in order to protect human health and safety and the environment. In carrying out this mission, waste management staff in the Waste Management and Remedial Action Division (WMRAD) will (1) guide ORNL in optimizing waste reduction and waste management capabilities and (2) conduct waste management operations in a compliant, publicly acceptable, technically sound, and cost-efficient manner. Waste management requirements for DOE radioactive wastes are detailed in DOE Order 5820.2A, and the ORNL Waste Management Program encompasses all elements of this order. The requirements of this DOE order and other appropriate DOE orders, along with applicable Tennessee Department of Environment and Conservation and US Environmental Protection Agency (EPA) rules and regulations, provide the principal source of regulatory guidance for waste management operations at ORNL. The objective of this document is compilation and consolidation of information on how the ORNL Waste Management Program is conducted, which waste management facilities are being used to manage wastes, what activities are planned for FY 1994, and how all of the activities are documented.« less
Fluor Daniel Hanford implementation plan for DOE Order 5480.28, Natural phenomena hazards mitigation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Conrads, T.J.
1997-09-12
Natural phenomena hazards (NPH) are unexpected acts of nature that pose a threat or danger to workers, the public, or the environment. Earthquakes, extreme winds (hurricane and tornado), snow, flooding, volcanic ashfall, and lightning strikes are examples of NPH that could occur at the Hanford Site. U.S. Department of Energy (DOE) policy requires facilities to be designed, constructed, and operated in a manner that protects workers, the public, and the environment from hazards caused by natural phenomena. DOE Order 5480.28, Natural Phenomena Hazards Mitigation, includes rigorous new natural phenomena criteria for the design of new DOE facilities, as well asmore » for the evaluation and, if necessary, upgrade of existing DOE facilities. The Order was transmitted to Westinghouse Hanford Company in 1993 for compliance and is also identified in the Project Hanford Management Contract, Section J, Appendix C. Criteria and requirements of DOE Order 5480.28 are included in five standards, the last of which, DOE-STD-1023, was released in fiscal year 1996. Because the Order was released before all of its required standards were released, enforcement of the Order was waived pending release of the last standard and determination of an in-force date by DOE Richland Operations Office (DOE-RL). Agreement also was reached between the Management and Operations Contractor and DOE-RL that the Order would become enforceable for new structures, systems, and components (SSCS) 60 days following issue of a new order-based design criteria in HNF-PRO-97, Engineering Design and Evaluation. The order also requires that commitments addressing existing SSCs be included in an implementation plan that is to be issued 1 year following the release of the last standard. Subsequently, WHC-SP-1175, Westinghouse Hanford Company Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, Rev. 0, was issued in November 1996, and this document, HNF-SP-1175, Fluor Daniel Hanford Implementation Plan for DOE Order 5480.28, Natural Phenomena Hazards Mitigation, is Rev. 1 of that plan.« less
Nuclear rocket propulsion technology - A joint NASA/DOE project
NASA Technical Reports Server (NTRS)
Clark, John S.
1991-01-01
NASA and the DOE have initiated critical technology development for nuclear rocket propulsion systems for SEI human and robotic missions to the moon and to Mars. The activities and project plan of the interagency project planning team in FY 1990 and 1991 are summarized. The project plan includes evolutionary technology development for both nuclear thermal and nuclear electric propulsion systems.
ERIC Educational Resources Information Center
Pennsylvania State Dept. of Environmental Resources, Harrisburg.
This document contains lesson plans about recycling for teachers in grades K-12. Titles include: (1) "Waste--Where Does It Come From? Where Does It Go?" (2) "Litter Detectives," (3) "Classroom Paper Recycling," (4) "Recycling Survey," (5) "Disposal and Recycling Costs," (6) "Composting…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cartmell, D.B.
1995-09-01
Based on US Department of Energy (DOE), Richland Operations Office (RL) review, specific areas of Westinghouse Hanford Company (WHC), Transition Projects ``Draft`` Multi-Year Program Plan (MYPP) were revised in preparation for the RL approval ceremony on September 26, 1995. These changes were reviewed with the appropriate RL Project Manager. The changes have been incorporated to the MYPP electronic file, and hard copies replacing the ``Draft`` MYPP will be distributed after the formal signing. In addition to the comments received, a summary level schedule and outyear estimates for the K Basin deactivation beginning in FY 2001 have been included. The Kmore » Basin outyear waste data is nearing completion this week and will be incorporated. This exclusion was discussed with Mr. N.D. Moorer, RL, Facility Transition Program Support/Integration. The attached MYPP scope/schedule reflects the Integrated Target Case submitted in the April 1995 Activity Data Sheets (ADS) with the exception of B Plant and the Plutonium Finishing Plant (PFP). The 8 Plant assumption in FY 1997 reflects the planning case in the FY 1997 ADS with a shortfall of $5 million. PFP assumptions have been revised from the FY 1997 ADS based on the direction provided this past summer by DOE-Headquarters. This includes the acceleration of the polycube stabilization back to its originally planned completion date. Although the overall program repricing in FY 1996 allowed the scheduled acceleration to fall with the funding allocation, the FY 1997 total reflects a shortfall of $6 million.« less
Code of Federal Regulations, 2011 CFR
2011-04-01
... 20 Employees' Benefits 2 2011-04-01 2011-04-01 false Does a State VR agency continue to provide... Rehabilitation Agencies' Participation Participation in the Ticket to Work Program § 411.375 Does a State VR.... The State VR agency must continue to provide services under the requirements of the State plan...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 2 2010-04-01 2010-04-01 false Does a State VR agency continue to provide... Rehabilitation Agencies' Participation Participation in the Ticket to Work Program § 411.375 Does a State VR.... The State VR agency must continue to provide services under the requirements of the State plan...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 20 Employees' Benefits 2 2014-04-01 2014-04-01 false Does a State VR agency continue to provide... Rehabilitation Agencies' Participation Participation in the Ticket to Work Program § 411.375 Does a State VR.... The State VR agency must continue to provide services under the requirements of the State plan...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 20 Employees' Benefits 2 2013-04-01 2013-04-01 false Does a State VR agency continue to provide... Rehabilitation Agencies' Participation Participation in the Ticket to Work Program § 411.375 Does a State VR.... The State VR agency must continue to provide services under the requirements of the State plan...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 20 Employees' Benefits 2 2012-04-01 2012-04-01 false Does a State VR agency continue to provide... Rehabilitation Agencies' Participation Participation in the Ticket to Work Program § 411.375 Does a State VR.... The State VR agency must continue to provide services under the requirements of the State plan...
40 CFR 60.2565 - How does the model rule relate to the required elements of my State plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false How does the model rule relate to the... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES... of Model Rule § 60.2565 How does the model rule relate to the required elements of my State plan? Use...
40 CFR 60.2565 - How does the model rule relate to the required elements of my State plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false How does the model rule relate to the... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES... of Model Rule § 60.2565 How does the model rule relate to the required elements of my State plan? Use...
40 CFR 60.2565 - How does the model rule relate to the required elements of my State plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false How does the model rule relate to the... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES... of Model Rule § 60.2565 How does the model rule relate to the required elements of my State plan? Use...
WIPP Magnesium Oxide (MgO) - Planned Change Request
On April 10, 2006, the DOE submitted a planned change request pertaining to the amount of MgO emplaced in the WIPP repository. MgO is an engineered barrier that DOE included as part of the original WIPP Certification Decision.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Truex, Michael J.; Strickland, Christopher E.; Oostrom, Martinus
A field test of desiccation is being conducted as an element of the Deep Vadose Zone Treatability Test Program. The active desiccation portion of the test has been completed. Monitoring data have been collected at the field test site during the post-desiccation period and are reported herein. This is an interim data summary report that includes about 4 years of post-desiccation monitoring data. The DOE field test plan proscribes a total of 5 years of post-desiccation monitoring.
State administration and financing of family planning services.
Weinberg, D
1972-04-01
A 1971 survey by the Center for Family Planning Program Development consisted of a questionnaire mailed to health and welfare directors in 50 states and 5 federal jurisdictions concerning their family planning policies and administrative practices. 52 agencies responded; Guam, Mississippi, and Louisiana did not. The major funding for state health agencies was allocated by HEW and by maternal and child health (MCH) formula grants under Title 5 of the Social Security Act. 11 states made additional expenditures of $1.7 million for a variety of purposes. 21 states required local welfare departments to purchase services under the Medicaid program established by Title 19 of the Social Security Act. Administration was assigned to specific organizations within the state health agencies. 31 states reported a total of 128 full-time professional personnel, with 90 assigned at state headquarters level. In general, on a state-by-state basis, the full-time staff does not correspond to the size of the appropriations. Survey findings were useful measures of resource commitments to family planning services by state health and welfare agencies and provided data on future levels of resource requirements.
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. S. Tobiason
Area 3 Septic Waste Systems 1 and 5 are located in Area 3 of the Tonopah Test Range (TTR) (Figure 1). The site is listed in the Federal Facility Agreement and Consent Order (FFACO, 1996) as Corrective Action Unit (CAU) 428 and includes Corrective Action Sites 03-05-002-SW01 (Septic Waste System 1 [SWS 1]), and 03-05-002-SW05 (Septic Waste System 5 [SWS 5]). The site history for the CAU is provided in the Corrective Action Investigation Plan (U.S. Department of Energy, Nevada Operations Office [DOE/NV], 1999). SWS 1 consists of two leachfields and associated septic tanks. SWS 1 received effluent from bothmore » sanitary and industrial sources from various buildings in Area 3 of the TTR (Figure 2). SWS 5 is comprised of one leachfield and outfall with an associated septic tank. SWS 5 received effluent from sources in Building 03-50 in Area 3 of the TTR (Figure 2). Both systems were active until 1990 when a consolidated sewer system was installed. The purpose of this Corrective Action Plan (CAP) is to provide the strategy and methodology to close the Area 3 SWS 1 and 5. The CAU will be closed following state and federal regulations and the FFACO (1996). Site characterization was done during May and June 1999. Samples of the tank contents, leachfield soil, and soil under the tanks and pipes were collected. The results of the characterization were reported in the Corrective Action Decision Document (CADD) (DOE/NV, 2000). Additional sampling was done in May 2000, the results of which are presented in this plan. Soil sample results indicated that two constituents of concern were detected above Preliminary Action Levels (PALs). Total arsenic was detected at a concentration of 68.7 milligrams per kilogram (mg/kg). The arsenic was found under the center distribution line at the proximal end of the SWS 5 Leachfield (Figure 3). Total benzo(a)pyrene was detected at a concentration of 480 micrograms per kilogram ({micro}g/kg). The benzo(a)pyrene was found in the soil under the discharge line at SWS 1 Septic Tank 33-1A (Figure 3). These concentrations are above the PALs of 3.0 mg/kg and 360 {micro}g/kg, respectively (DOE/NV, 1999) but are below the hazardous regulatory levels for these constituents. The soil will be excavated and disposed in the Nevada Test Site (NTS) Area 23 Sanitary Landfill.« less
Maintenance Plan for the Composite Analysis of the Hanford Site, Southeast Washington.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lehman, L. L.; Nichols, W. E.
The U.S. Department of Energy (DOE) manuals for radioactive waste management, DOE M 435.1-1 Chg 21 and DOE-STD-5002-2017, require that the Hanford Site maintain site performance assessments and composite analyses (CAs). This document describes the plan for maintaining the CA that supports waste disposal and remedial actions for the Hanford Site. An initial CA of the site was issued in 1998, conditionally approved in 1999, received further analysis to satisfy conditions in an addendum in 2001, and was approved in 2002. This document meets the maintenance plan requirements described in DOE M 435.1-1 Chg 2 and DOE-STD-5002-2017 and implements themore » requirements of the disposal authorization related to the CA for the U.S. Department of Energy, Richland Operations Office, the responsible field office, and its contractors.« less
Planning Electric Transmission Lines: A Review of Recent Regional Transmission Plans
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eto, Joseph H.
The first Quadrennial Energy Review (QER) recommends that the U.S. Department of Energy (DOE) conduct a national review of transmission plans and assess the barriers and incentives to their implementation. DOE tasked Lawrence Berkeley National Laboratory (LBNL) to prepare two reports to support the agency’s response to this recommendation. This report reviews regional transmission plans and regional transmission planning processes that have been directed by Federal Energy Regulatory Commission (FERC) Order Nos. 890 and 1000. We focus on the most recent regional transmission plans (those issued in 2015 and through approximately mid-year 2016) and current regional transmission planning processes. Amore » companion report focuses on non-plan-related factors that affect transmission projects.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... to OSG for a planning and negotiation grant? 1000.64 Section 1000.64 Indians OFFICE OF THE ASSISTANT...-GOVERNMENT ACT AMENDMENTS TO THE INDIAN SELF-DETERMINATION AND EDUCATION ACT Other Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.64 How does...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This plan covers robotics Research, Development, Demonstration, Testing and Evaluation activities in the Program for the next five years. These activities range from bench-scale R D to full-scale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development Program (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management (ER WM) operations at DOE sites to be safer,more » faster and cheaper. Five priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. In July 1990 a forum was held announcing the robotics program. Over 60 organizations (industrial, university, and federal laboratory) made presentations on their robotics capabilities. To stimulate early interactions with the ER WM activities at DOE sites, as well as with the robotics community, the RTDP sponsored four technology demonstrations related to ER WM needs. These demonstrations integrated commercial technology with robotics technology developed by DOE in support of areas such as nuclear reactor maintenance and the civilian reactor waste program. 2 figs.« less
Savannah River Site nuclear materials management plan FY 2017-2031
DOE Office of Scientific and Technical Information (OSTI.GOV)
Magoulas, V.
The purpose of the Nuclear Materials Management Plan (herein referred to as “this Plan”) is to integrate and document the activities required to disposition the legacy and/or surplus Enriched Uranium (EU) and Plutonium (Pu) and other nuclear materials already stored or anticipated to be received by facilities at the Department of Energy (DOE) Savannah River Site (SRS) as well as the activities to support the DOE Tritium mission. It establishes a planning basis for EU and Pu processing operations in Environmental Management Operations (EMO) facilities through the end of their program missions and for the tritium through the National Nuclearmore » Security Administration (NNSA) Defense Programs (DP) facilities. Its development is a joint effort among the Department of Energy - Savannah River (DOE-SR), DOE – Environmental Management (EM), NNSA Office of Material Management and Minimization (M3), NNSA Savannah River Field Office (SRFO), and the Management and Operations (M&O) contractor, Savannah River Nuclear Solutions, LLC (SRNS). Life-cycle program planning for Nuclear Materials Stabilization and Disposition and the Tritium Enterprise may use this Plan as a basis for the development of the nuclear materials disposition scope and schedule. This Plan assumes full funding to accomplish the required project and operations activities. It is recognized that some aspects of this Plan are pre decisional with regard to National Environmental Policy Act (NEPA); in such cases new NEPA actions will be required.« less
NOTE: Reducing the number of segments in unidirectional MLC segmentations
NASA Astrophysics Data System (ADS)
Mellado, X.; Cruz, S.; Artacho, J. M.; Canellas, M.
2010-02-01
In intensity-modulated radiation therapy (IMRT), fluence matrices obtained from a treatment planning system are usually delivered by a linear accelerator equipped with a multileaf collimator (MLC). A segmentation method is needed for decomposing these fluence matrices into segments suitable for the MLC, and the number of segments used is an important factor for treatment time. In this work, an algorithm for reduction of the number of segments (NS) is presented for unidirectional segmentations, where there is no backtracking of the MLC leaves. It uses a geometrical representation of the segmentation output for searching the key values in a fluence matrix that complicate its decomposition. The NS reduction is achieved by performing minor modifications in these values, under the conditions of avoiding substantial modifications of the dose-volume histogram, and does not increase in average the total number of monitor units delivered. The proposed method was tested using two clinical cases planned with the PCRT 3D® treatment planning system.
Transition and closeout of the Fernald Closure Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bilson, H.E.; Terry, T.; Reising, J.
The U.S. Department of Energy (DOE) and Fluor Fernald have completed the majority of the cleanup of the Fernald Site. The over 1,000 acre complex for processing uranium has been demolished and soil contamination has been remediated. With acres of wetlands and prairies replacing the buildings and waste pits. At the end of the project the focus shifted to developing demonstrating the completion of the project and the contract, as well as ensuring a smooth transition of the facility from the DOE's Environmental Management (EM) Program to the DOE's Legacy Management (LM) Program. Working with the DOE, each portion ofmore » the closure contract was examined for specific closure definition. From this negotiation effort the Comprehensive Exit and Transition Plan (CE/T Plan) was written. The CE/T Plan is intended to assist DOE in the analysis that the site is ready for transfer into long-term stewardship (LTS) (also referred to as legacy management) and that Fluor Fernald, Inc. has satisfactorily completed the closure contract statement of work elements. Following the Lessons Learned from the closure of the Rocky Flats Site, the DOE's Legacy Management Program created a matrix of Transition Elements required to ensure adequate information was in place to allow the new prime contractor to perform the Legacy Management scope of work. The transition plan included over 1,000 elements broken down into functional areas and relied on specific Fernald Responsibility Transition Packages (RTPs) for detailed transition actions. The template for Closure and Transition Planning used at the Fernald Site was developed using the best Lessons Learned from across the DOE Complex. The template could be used for other sites, and lessons learned from this closure and transition will be appropriate for all closure projects. (authors)« less
Common occupational classification system - revision 3
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stahlman, E.J.; Lewis, R.E.
1996-05-01
Workforce planning has become an increasing concern within the DOE community as the Office of Environmental Restoration and Waste Management (ER/WM or EM) seeks to consolidate and refocus its activities and the Office of Defense Programs (DP) closes production sites. Attempts to manage the growth and skills mix of the EM workforce while retaining the critical skills of the DP workforce have been difficult due to the lack of a consistent set of occupational titles and definitions across the complex. Two reasons for this difficulty may be cited. First, classification systems commonly used in industry often fail to cover inmore » sufficient depth the unique demands of DOE`s nuclear energy and research community. Second, the government practice of contracting the operation of government facilities to the private sector has introduced numerous contractor-specific classification schemes to the DOE complex. As a result, sites/contractors report their workforce needs using unique classification systems. It becomes difficult, therefore, to roll these data up to the national level necessary to support strategic planning and analysis. The Common Occupational Classification System (COCS) is designed to overcome these workforce planning barriers. The COCS is based on earlier workforce planning activities and the input of technical, workforce planning, and human resource managers from across the DOE complex. It provides a set of mutually-exclusive occupation titles and definitions that cover the broad range of activities present in the DOE complex. The COCS is not a required record-keeping or data management guide. Neither is it intended to replace contractor/DOE-specific classification systems. Instead, the system provides a consistent, high- level, functional structure of occupations to which contractors can crosswalk (map) their job titles.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rana Zucchi, Global Energy Concepts, LLC; Brad Reeve, Kotzebue Electric Association; DOE Project Officer - Doug Hooker
The Kotzebue Wind Power Project is a joint undertaking of the U.S. Department of Energy (DOE); Kotzebue Electric Association (KEA); and the Alaska Energy Authority (AEA). The goal of the project is to develop, construct, and operate a wind power plant interconnected to a small isolated utility grid in an arctic climate in Northwest Alaska. The primary objective of KEA’s wind energy program is to bring more affordable electricity and jobs to remote Alaskan communities. DOE funding has allowed KEA to develop a multi-faceted approach to meet these objectives that includes wind project planning and development, technology transfer, and communitymore » outreach. The first wind turbines were installed in the summer of 1997 and the newest turbines were installed in the spring of 2007. The total installed capacity of the KEA wind power project is 1.16 MW with a total of 17 turbines rated between 65 kW and 100 kW. The operation of the wind power plant has resulted in a wind penetration on the utility system in excess of 35% during periods of low loads. This document and referenced attachments are presented as the final technical report for the U.S. Department of Energy (DOE) grant agreement DE-FG36-97GO10199. Interim deliverables previously submitted are also referenced within this document and where reasonable to do so, specific sections are incorporated in the report or attached as appendices.« less
Code of Federal Regulations, 2014 CFR
2014-04-01
...-GOVERNMENT ACT AMENDMENTS TO THE INDIAN SELF-DETERMINATION AND EDUCATION ACT Other Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.64 How does...
Code of Federal Regulations, 2013 CFR
2013-04-01
...-GOVERNMENT ACT AMENDMENTS TO THE INDIAN SELF-DETERMINATION AND EDUCATION ACT Other Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.64 How does...
Code of Federal Regulations, 2012 CFR
2012-04-01
...-GOVERNMENT ACT AMENDMENTS TO THE INDIAN SELF-DETERMINATION AND EDUCATION ACT Other Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.64 How does...
Code of Federal Regulations, 2011 CFR
2011-04-01
...-GOVERNMENT ACT AMENDMENTS TO THE INDIAN SELF-DETERMINATION AND EDUCATION ACT Other Financial Assistance for Planning and Negotiation Grants for Non-BIA Programs Eligibility and Application Process § 1000.64 How does...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, Don
2014-04-01
Nuclear power has contributed almost 20% of the total amount of electricity generated in the United States over the past two decades. High capacity factors and low operating costs make nuclear power plants (NPPs) some of the most economical power generators available. Further, nuclear power remains the single largest contributor (nearly 70%) of non-greenhouse gas-emitting electric power generation in the United States. Even when major refurbishments are performed to extend operating life, these plants continue to represent cost-effective, low-carbon assets to the nation’s electrical generation capability. By the end of 2014, about one-third of the existing domestic fleet will havemore » passed their 40th anniversary of power operations, and about one-half of the fleet will reach the same 40-year mark within this decade. Recognizing the challenges associated with pursuing extended service life of commercial nuclear power plants, the U.S. Department of Energy’s (DOE) Office of Nuclear Energy (NE) and the Electric Power Research Institute (EPRI) have established separate but complementary research and development programs (DOE-NE’s Light Water Reactor Sustainability [LWRS] Program and EPRI’s Long-Term Operations [LTO] Program) to address these challenges. To ensure that a proper linkage is maintained between the programs, DOE-NE and EPRI executed a memorandum of understanding in late 2010 to “establish guiding principles under which research activities (between LWRS and LTO) could be coordinated to the benefit of both parties.” This document represents the third annual revision to the initial version (March 2011) of the plan as called for in the memorandum of understanding.« less
Facing Our Energy Challenges in a New Era of Science (2011 EFRC Forum)
Dehmer, Patricia M.
2018-04-26
Patricia Dehmer, Deputy Director for Science Programs at DOE, opened the May 26, 2011 EFRC Forum session, 'Global Perspectives on Frontiers in Energy Research,' with the talk, 'Facing Our Energy Challenges in a New Era of Science.' In her presentation, Dr. Dehmer gave a tutorial on the energy challenges facing our Nation and showed how the DOE research portfolio addresses those issues. The 2011 EFRC Summit and Forum brought together the EFRC community and science and policy leaders from universities, national laboratories, industry and government to discuss 'Science for our Nation's Energy Future.' In August 2009, the Office of Science established 46 Energy Frontier Research Centers. The EFRCs are collaborative research efforts intended to accelerate high-risk, high-reward fundamental research, the scientific basis for transformative energy technologies of the future. These Centers involve universities, national laboratories, nonprofit organizations, and for-profit firms, singly or in partnerships, selected by scientific peer review. They are funded at $2 to $5 million per year for a total planned DOE commitment of $777 million over the initial five-year award period, pending Congressional appropriations. These integrated, multi-investigator Centers are conducting fundamental research focusing on one or more of several 'grand challenges' and use-inspired 'basic research needs' recently identified in major strategic planning efforts by the scientific community. The purpose of the EFRCs is to integrate the talents and expertise of leading scientists in a setting designed to accelerate research that transforms the future of energy and the environment.
Lewis, Nate
2018-02-16
The Joint Center for Artificial Photosynthesis (JCAP) is a DOE Energy Innovation Hub focused on fuels from sunlight. JCAP's Director, Nate Lewis, spoke at the 2011 EFRC Summit about what JCAP is and how it is partnering with the EFRC community to accelerate the progress towards new solar fuels. The 2011 EFRC Summit and Forum brought together the EFRC community and science and policy leaders from universities, national laboratories, industry and government to discuss "Science for our Nation's Energy Future." In August 2009, the Office of Science established 46 Energy Frontier Research Centers. The EFRCs are collaborative research efforts intended to accelerate high-risk, high-reward fundamental research, the scientific basis for transformative energy technologies of the future. These Centers involve universities, national laboratories, nonprofit organizations, and for-profit firms, singly or in partnerships, selected by scientific peer review. They are funded at $2 to $5 million per year for a total planned DOE commitment of $777 million over the initial five-year award period, pending Congressional appropriations. These integrated, multi-investigator Centers are conducting fundamental research focusing on one or more of several âgrand challengesâ and use-inspired âbasic research needsâ recently identified in major strategic planning efforts by the scientific community. The purpose of the EFRCs is to integrate the talents and expertise of leading scientists in a setting designed to accelerate research that transforms the future of energy and the environment.
FY 1986 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office/RI during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance development, taskmore » monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. System models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental, LLC
2009-09-01
This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with themore » multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.« less
Illinois hospital using Web to build database for relationship marketing.
Rees, T
2000-01-01
Silver Cross Hospital and Medical Centers, Joliet, Ill., is promoting its Web site as a tool for gathering health information about patients and prospective patients in order to build a relationship marketing database. The database will enable the hospital to identify health care needs of consumers in Joliet, Will County and many southwestern suburbs of Chicago. The Web site is promoted in a multimedia advertising campaign that invites residents to participate in a Healthy Living Quiz that rewards respondents with free health screenings. The effort is part of a growing planning and marketing strategy in the health care industry called customer relationship management (CRM). Not only does a total CRM plan offer health care organizations the chance to discover the potential for meeting consumers' needs; it also helps find any marketplace gaps that may exist.
34 CFR 364.12 - How does the Secretary approve State plans?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 2 2011-07-01 2010-07-01 true How does the Secretary approve State plans? 364.12 Section 364.12 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION STATE INDEPENDENT LIVING SERVICES...
34 CFR 364.12 - How does the Secretary approve State plans?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 2 2010-07-01 2010-07-01 false How does the Secretary approve State plans? 364.12 Section 364.12 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION STATE INDEPENDENT LIVING SERVICES...
43 CFR 11.32 - How does the authorized official develop the Assessment Plan?
Code of Federal Regulations, 2010 CFR
2010-10-01
... Interior NATURAL RESOURCE DAMAGE ASSESSMENTS Assessment Plan Phase § 11.32 How does the authorized official... official's responsibility is shared with other natural resource trustees as a result of coexisting or contiguous natural resources or concurrent jurisdiction, the authorized official shall ensure that all other...
43 CFR 11.32 - How does the authorized official develop the Assessment Plan?
Code of Federal Regulations, 2011 CFR
2011-10-01
... Interior NATURAL RESOURCE DAMAGE ASSESSMENTS Assessment Plan Phase § 11.32 How does the authorized official... official's responsibility is shared with other natural resource trustees as a result of coexisting or contiguous natural resources or concurrent jurisdiction, the authorized official shall ensure that all other...
Energy/environment/technology two visions, two directions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox-Penner, P.
1995-12-31
This paper compares the energy policies proposed by the U.S. Congress and the U.S. Department of Energy (DOE). Connections between energy, economy, environment, and technology are discussed in some detail. The National Energy Policy Plan of the DOE is summarized, and the impact of budget cuts proposed by Congress are projected. Aspects of the DOE plan which are emphasized include research and development, minimization of regulation, and eliminating redundant government and private industry efforts. 5 figs., 5 tabs.
Strategic plan for infrastructure optimization
DOE Office of Scientific and Technical Information (OSTI.GOV)
Donley, C.D.
This document represents Fluor Daniel Hanford`s and DynCorp`s Tri-Cities Strategic Plan for Fiscal Years 1998--2002, the road map that will guide them into the next century and their sixth year of providing safe and cost effective infrastructure services and support to the Department of Energy (DOE) and the Hanford Site. The Plan responds directly to the issues raised in the FDH/DOE Critical Self Assessment specifically: (1) a strategy in place to give DOE the management (systems) and physical infrastructure for the future; (2) dealing with the barriers that exist to making change; and (3) a plan to right-size the infrastructuremore » and services, and reduce the cost of providing services. The Plan incorporates initiatives from several studies conducted in Fiscal Year 1997 to include: the Systems Functional Analysis, 200 Area Water Commercial Practices Plan, $ million Originated Cost Budget Achievement Plan, the 1OO Area Vacate Plan, the Railroad Shutdown Plan, as well as recommendations from the recently completed Review of Hanford Electrical Utility. These and other initiatives identified over the next five years will result in significant improvements in efficiency, allowing a greater portion of the infrastructure budget to be applied to Site cleanup. The Plan outlines a planning and management process that defines infrastructure services and structure by linking site technical base line data and customer requirements to work scope and resources. The Plan also provides a vision of where Site infrastructure is going and specific initiatives to get there.« less
FY 1987 current fiscal year work plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Current Year Work Plan presents a detailed description of the activities to be performed by the Joint Integration Office during FY87. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, task guidance, task monitoring, informationmore » gathering and task reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of program status reports for DOE. Program Analysis is performed by the JIO to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. This work plan includes: system analyses, requirements analyses, interim and procedure development, legislative and regulatory analyses, dispatch and traffic analyses, and data bases.« less
The EM SSAB Annual Work Plan Process: Focusing Board Efforts and Resources - 13667
DOE Office of Scientific and Technical Information (OSTI.GOV)
Young, Ralph
One of the most daunting tasks for any new member of a local board of the Environmental Management Site Specific Advisory Board (EM SSAB) is to try to understand the scope of the clean-up activities going on at the site. In most cases, there are at least two or three major cleanup activities in progress as well as monitoring of past projects. When planning for future projects is added to the mix, the list of projects can be long. With the clean-up activities involving all major environmental media - air, water, soils, and groundwater, new EM SSAB members can findmore » themselves totally overwhelmed and ineffective. Helping new members get over this initial hurdle is a major objective of EM and all local boards of the EM SSAB. Even as members start to understand the size and scope of the projects at a site, they can still be frustrated at the length of time it takes to see results and get projects completed. Many project and clean-up timelines for most of the sites go beyond 10 years, so it's not unusual for an EM SSAB member to see the completion of only 1 or 2 projects over the course of their 6-year term on the board. This paper explores the annual work planning process of the EM SSAB local boards, one tool that can be used to educate EM SSAB members into seeing the broader picture for the site. EM SSAB local work plans divide the site into projects focused on a specific environmental issue or media such as groundwater and/or waste disposal options. Projects are further broken down into smaller segments by highlighting major milestones. Using these metrics, local boards of the EM SSAB can start to quantify the effectiveness of the project in achieving the ultimate goal of site clean-up. These metrics can also trigger board advice and recommendations for EM. At the beginning of each fiscal year, the EM SSAB work plan provides a road map with quantifiable checkpoints for activities throughout the year. When the work plans are integrated with site-specific, enforceable regulatory milestones, they can provide a comprehensive work plan for not only the board, but also regulators, site contractors, and DOE. Because the work plans are reviewed and approved by DOE, they carry some weight in holding local boards of the EM SSAB accountable. This structure provides the basis for local boards to achieve their primary function, to provide DOE with information, advice, and recommendations concerning issues affecting the EM program at the site. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-09-01
The Ernest Orlando Lawrence Berkeley National Laboratory`s Comprehensive Facilities Plan (CFP) document provides analysis and policy guidance for the effective use and orderly future development of land and capital assets at the Berkeley Lab site. The CFP directly supports Berkeley Lab`s role as a multiprogram national laboratory operated by the University of California (UC) for the Department of Energy (DOE). The CFP is revised annually on Berkeley Lab`s Facilities Planning Website. Major revisions are consistent with DOE policy and review guidance. Facilities planing is motivated by the need to develop facilities for DOE programmatic needs; to maintain, replace and rehabilitatemore » existing obsolete facilities; to identify sites for anticipated programmatic growth; and to establish a planning framework in recognition of site amenities and the surrounding community. The CFP presents a concise expression of the policy for the future physical development of the Laboratory, based upon anticipated operational needs of research programs and the environmental setting. It is a product of the ongoing planning processes and is a dynamic information source.« less
Why natural disaster planning scenarios are often so disastrously wrong.
NASA Astrophysics Data System (ADS)
Verosub, K. L.
2017-12-01
Taken together the four hurricanes that impacted the United States in the summer of 2017 demonstrate the difficulties involved in trying to plan for any natural disaster, not simply a major hurricane. They also highlight the extraordinary degree to which small and/or random variations in initial conditions can have enormous consequences on the outcome of an event and on the ability of a society to respond to it. For example, if Harvey had been moving faster, it would have meant less rainfall and hence less flooding in the Houston area whereas a slight change in the path of Irma would have significantly affected which portions of the Florida peninsula would have experienced greater or lesser devastation. In the case of Marie, hurricane intensity and path as well as the terrain in Puerto Rico and the inherent state of its infrastructure greatly complicated relief and recovery efforts there. An additional factor that makes planning scenarios so difficult to develop is that major natural disasters can often be analyzed as a sequence of events. At each juncture in the sequence, the event might evolve along two or more very different pathways, which can lead to different outcomes. Sometimes, as with Nate, an event evolves more or less "as expected" and the planning scenario does what it was supposed to do, namely, help people respond to the event. But to a much greater extent than is usually recognized, small or random variations can drive an event off its expected trajectory and into a response realm that "no one could have foreseen." Even worse is when those small or random variations allow an event to bifurcate and follow two or more different pathways simultaneously, leading to a cascading disaster that totally overwhelms whatever planning and preparation has been put in place. Perhaps the main lessons to be learned from these storms is that planning for any disaster requires greater recognition of the importance of small or random factors and greater appreciation of the complexity of these events. One plan or one model scenario does not provide adequate preparation for all events of a particular type and is probably unlikely to provide adequate preparation for any single given event.
Mechanical energy expenditures and movement efficiency in full body reaching movements.
Sha, Daohang; France, Christopher R; Thomas, James S
2010-02-01
The effect of target location, speed, and handedness on the average total mechanical energy and movement efficiency is studied in 15 healthy subjects (7 males and 8 females with age 22.9 +/- 1.79 years old) performing full body reaching movements. The average total mechanical energy is measured as the time average of integration of joint power, potential energy, and kinetic energy respectively. Movement efficiency is calculated as the ratio of total kinetic energy to the total joint power and potential energy. Results show that speed and target location have significant effects on total mechanical energy and movement efficiency, but reaching hand only effects kinetic energy. From our findings we conclude that (1) efficiency in whole body reaching is dependent on whether the height of the body center of mass is raised or lowered during the task; (2) efficiency is increased as movement speed is increased, in part because of greater changes in potential energy; and (3) the CNS does not appear to use movement efficiency as a primary planning variable in full body reaching. It may be dependent on a combination of other factors or constraints.
1988-09-01
Quality Management (TQM). Documentation of such implementation methods can provide useful crossfeed to other services organizations attempting similiar efforts. The following research questions were addressed to present the case in a useful context for interpretation: (1) What is TQM and how will it be implemented in AFALC; (2) How can the quality of service organizations be improved and what techniques may be useful for this purpose; (3) How does the environment at AFALC differ from most Air Force organizations implementing TQM and what obstacles must it overcome; (4) How
1991-01-01
that unless you put them all together and have a major plan by which they all integrate , it is this old business that the sum or the product is...variables are heavily dependent on duration and intensity, factors which are beginning to clear, but are still largely unknown in light of the favorable...0.4 Revolving Funds Fuel Price Increase 0.7 TOTAL 9.1 12.3 39.2 The combat expenses are above and beyond this, because it is very much dependent
Code of Federal Regulations, 2011 CFR
2011-07-01
... control respecting management of the plan, does not exercise any authority or control respecting management or disposition of the assets of the plan, and does not render investment advice with respect to... exercise “discretionary authority or discretionary control respecting management of such plan” and are...
5 CFR 3501.104 - Prohibited interests in mining.
Code of Federal Regulations, 2011 CFR
2011-01-01
... available investment fund (e.g., a mutual fund) which, in its prospectus, does not indicate the objective or... financial interests held in the fund; (iv) A legal or beneficial interest in a qualified profit sharing, retirement, or similar plan, provided that the plan does not invest more than 25 percent of its funds in debt...
5 CFR 3501.104 - Prohibited interests in mining.
Code of Federal Regulations, 2010 CFR
2010-01-01
... available investment fund (e.g., a mutual fund) which, in its prospectus, does not indicate the objective or... financial interests held in the fund; (iv) A legal or beneficial interest in a qualified profit sharing, retirement, or similar plan, provided that the plan does not invest more than 25 percent of its funds in debt...
34 CFR 461.23 - How does the Secretary approve State plans and amendments?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 3 2010-07-01 2010-07-01 false How does the Secretary approve State plans and amendments? 461.23 Section 461.23 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION ADULT EDUCATION STATE...
34 CFR 461.23 - How does the Secretary approve State plans and amendments?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 34 Education 3 2014-07-01 2014-07-01 false How does the Secretary approve State plans and amendments? 461.23 Section 461.23 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION ADULT EDUCATION STATE...
34 CFR 461.23 - How does the Secretary approve State plans and amendments?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 34 Education 3 2012-07-01 2012-07-01 false How does the Secretary approve State plans and amendments? 461.23 Section 461.23 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION ADULT EDUCATION STATE...
34 CFR 461.23 - How does the Secretary approve State plans and amendments?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 34 Education 3 2013-07-01 2013-07-01 false How does the Secretary approve State plans and amendments? 461.23 Section 461.23 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION ADULT EDUCATION STATE...
34 CFR 461.23 - How does the Secretary approve State plans and amendments?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 3 2011-07-01 2011-07-01 false How does the Secretary approve State plans and amendments? 461.23 Section 461.23 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION ADULT EDUCATION STATE...
34 CFR 403.52 - When does the Secretary approve State plans and amendments?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 3 2010-07-01 2010-07-01 false When does the Secretary approve State plans and amendments? 403.52 Section 403.52 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE VOCATIONAL AND APPLIED...
Multi-Year Program Plan FY'09-FY'15 Solid-State Lighting Research and Development
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2009-03-01
President Obama's energy and environment agenda calls for deployment of 'the Cheapest, Cleanest, Fastest Energy Source - Energy Efficiency.' The Department of Energy's (DOE) Office of Energy Efficiency and Renewable Energy (EERE) plays a critical role in advancing the President's agenda by helping the United States advance toward an energy-efficient future. Lighting in the United States is projected to consume nearly 10 quads of primary energy by 2012.3 A nation-wide move toward solid-state lighting (SSL) for general illumination could save a total of 32.5 quads of primary energy between 2012 and 2027. No other lighting technology offers the DOE andmore » our nation so much potential to save energy and enhance the quality of our built environment. The DOE has set forth the following mission statement for the SSL R&D Portfolio: Guided by a Government-industry partnership, the mission is to create a new, U.S.-led market for high-efficiency, general illumination products through the advancement of semiconductor technologies, to save energy, reduce costs and enhance the quality of the lighted environment.« less
Boemi, Sn; Papadopoulos, Am; Karagiannidis, A; Kontogianni, S
2010-11-01
Renewable energy sources (RES), excluding large hydroelectric plants, currently produce 4.21% of total electricity production in Greece. Even when considering the additional production from large hydroelectric plants, which accounts for some 7.8%, the distance to be covered towards the objective of 20% electricity produced from RES by 2010 and respectively towards 20% of total energy production by 2020 is discouraging. The potential, however, does exist; unfortunately so do serious barriers. On the other hand, solid waste management (SWM) is an issue that generates continuously increasing interest due to the extra amounts of solid waste generated; the lack of existing disposal facilities with adequate infrastructure and integrated management plans, also often accompanied by legislative and institutional gaps. However, socio-economic and public awareness problems are still met in the planning and implementation of RES and SWM projects, together with the lack of a complete national cadastre and a spatial development master plan, specifying areas eligible for RES and SWM development. Specific barriers occur for individual RES and the on-going inclusion of waste-derived renewable energy in the examined palette further increases the complexity of the entire issue. The consolidated study of this broad set of barriers was a main task of the present study which was carried out within the frame of a Hellenic-Canadian research project; the main results will be discussed herein.
Improving DOE Project Performance Using the DOD Integrated Master Plan - 12481
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alleman, Glen B.; Nosbisch, Michael R.
2012-07-01
DOE O 413 measures a project's progress to plan by the consumption of funding, the passage of time, and the meeting of milestones. In March of 2003, then Under Secretary, Energy, Science, Card received a memo directing the implementation of Project Management and the Project Management Manual, including the Integrated Master Plan and Integrated Master Schedule. This directive states 'the integrated master plan and schedule tie together all project tasks by showing their logical relationships and any constraints controlling the start or finish of each task. This process results in a hierarchy of related functional and layered schedules derived frommore » the Work Breakdown Structure that can be used for monitoring and controlling project progress'. This paper shows how restoring the IMP/IMS paradigm to DOE program management increases the probability of program success in ways not currently available using DOD O 413 processes alone. Using DOE O 413 series guidance, adding the Integrated Master Plan and Integrated Master Schedule paradigm would provide a hierarchical set of performance measures for each 'package of work,' that provides measurable visibility to the increasing maturity of the project. This measurable maturity provides the mechanism to forecast future performance of cost, schedule, and technical outcomes in ways not available using just the activities in DOE O 413. With this information project managers have another tool available to address the issues identified in GAO-07-336 and GAO-09-406. (authors)« less
Configuration Management Plan for K Basins
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weir, W.R.; Laney, T.
This plan describes a configuration management program for K Basins that establishes the systems, processes, and responsibilities necessary for implementation. The K Basins configuration management plan provides the methodology to establish, upgrade, reconstitute, and maintain the technical consistency among the requirements, physical configuration, and documentation. The technical consistency afforded by this plan ensures accurate technical information necessary to achieve the mission objectives that provide for the safe, economic, and environmentally sound management of K Basins and the stored material. The configuration management program architecture presented in this plan is based on the functional model established in the DOE Standard, DOE-STD-1073-93,more » {open_quotes}Guide for Operational Configuration Management Program{close_quotes}.« less
Deep Borehole Field Test Laboratory and Borehole Testing Strategy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kuhlman, Kristopher L.; Brady, Patrick V.; MacKinnon, Robert J.
2016-09-19
Deep Borehole Disposal (DBD) of high-level radioactive wastes has been considered an option for geological isolation for many years (Hess et al. 1957). Recent advances in drilling technology have decreased costs and increased reliability for large-diameter (i.e., ≥50 cm [19.7”]) boreholes to depths of several kilometers (Beswick 2008; Beswick et al. 2014). These advances have therefore also increased the feasibility of the DBD concept (Brady et al. 2009; Cornwall 2015), and the current field test design will demonstrate the DBD concept and these advances. The US Department of Energy (DOE) Strategy for the Management and Disposal of Used Nuclear Fuelmore » and High-Level Radioactive Waste (DOE 2013) specifically recommended developing a research and development plan for DBD. DOE sought input or expression of interest from States, local communities, individuals, private groups, academia, or any other stakeholders willing to host a Deep Borehole Field Test (DBFT). The DBFT includes drilling two boreholes nominally 200m [656’] apart to approximately 5 km [16,400’] total depth, in a region where crystalline basement is expected to begin at less than 2 km depth [6,560’]. The characterization borehole (CB) is the smaller-diameter borehole (i.e., 21.6 cm [8.5”] diameter at total depth), and will be drilled first. The geologic, hydrogeologic, geochemical, geomechanical and thermal testing will take place in the CB. The field test borehole (FTB) is the larger-diameter borehole (i.e., 43.2 cm [17”] diameter at total depth). Surface handling and borehole emplacement of test package will be demonstrated using the FTB to evaluate engineering feasibility and safety of disposal operations (SNL 2016).« less
UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less
Obama Presents Far-Reaching Climate Plan, Addresses Keystone Pipeline Proposal
NASA Astrophysics Data System (ADS)
Showstack, Randy
2013-07-01
Stating that climate change "is a challenge that does not pause for partisan gridlock," U.S. President Barack Obama took matters into his own hands and presented a broad-based climate action plan on 25 June. The plan, which relies on existing administrative authority and does not require congressional approval, includes three primary objectives: cutting carbon pollution in the United States, preparing the nation for the impacts of climate change, and leading international efforts to address climate change.
The Military Survivor Benefit Plan: How Much Does It Benefit the Retiree?
1979-12-01
advantages . Chapter V offers conclusions and recommendations. 4 I II. What is the Survivor Benefit Plan This chapter briefly traces military survivor...basis, founded upon the relation of parties to each other, either pecuniary or of blood or affinity, to expect some benefit or advantage from the...AFIT/GOR/SM/79D-9 THE MILITARY SURVIVOR BENEFIT PLAN: HOW MUCH DOES IT BENEFIT THE RETIREE THESIS AFIT/GOR/SM /79D-9 Thomas L. Wade Captain USAF ,zkC
DOE Office of Scientific and Technical Information (OSTI.GOV)
Adkins, Brian; Castilone, Lisa
The objective of the project was to provide affordable renewable energy to 22 low income reservation homeowners; provide job training to tribal members and reduce air pollution by equivalent carbon offsets. The project exceeded grant objectives installing 66kW of rooftop solar on 22 low income single family homes and providing hands-on PV rooftop solar installation training to 24 tribal individuals (four more than planned). The project was a phased installment of an on-going partnership between the Tribe and GRID that was initiated in 2013 whereby 62 rooftop solar units were installed prior to this funded effort. The reported work inmore » this report describes the funded effort where US Department of Energy provided partial funding through grant award IE0006949 and marks the first phase of an effort matching California Solar SASH Initiative funding with DOE Office of Indian Energy Funding and brings the total for the program to 84 installed systems (running total of 271 Kw installed) and the end of the project. Tribal workforce development was a key aspect of the project and trained 24tribal members for a total 1168 cumulative on-job training hours. The solar installations and training efforts were fully completed by September of 2016 with 66.6 kW installed - 8 kW more than the original estimate stated in the grant application.« less
OPERATION OF A PUBLIC GEOLOGIC CORE AND SAMPLE REPOSITORY IN HOUSTION, TEXAS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Scott W. Tinker; Beverly Blakeney DeJarnett
2006-04-14
The Bureau of Economic Geology's Houston Research Center (HRC) is well established as a premier regional research center for geologic research serving not only Houston, but geoscientists from around Texas, the US, and even the world. As reported in the 2004-2005 technical progress report to the DOE, the HRC provides a state-of-the-art core viewing facility, two fully equipped conference rooms, and a comprehensive technical library, all available for public use. In addition, the HRC currently now houses over 600,000 boxes of rock material, and has space to hold approximately 300,000 more boxes. Use of the facility has remained strong during this fourth year of operation; the number of patrons averaged nearly 150 per month from June 1, to 2005 May 31, 2006. This usage is a combination of individuals describing core, groups of geoscientists holding seminars and workshops, and various industry and government-funded groups holding short courses, workshops, and seminars. These numbers are in addition to the numerous daily requests from patrons desiring to have rock material shipped offsite to their own offices. The BEG/HRC secured several substantial donations of rock materials and cash totaling approximatelymore » $2.2 million during the 2005-2006 operating period. All of these funds went directly into an endowment that will, when complete, endow the HRC in perpetuity. Specific details regarding the funds in the endowment are addressed in a table later in this report. Outreach during 2005 and 2006 included many technical presentations and several publications on the HRC. Several field trips to the facility were held for geoscience professionals and grade school students alike. Goals for the upcoming year include securing donations of rock material and cash to approach full funding of the HRC endowment. Thanks to donations totaling $2.2 million from Shea Homes (heritage Unocal rock material), Chevron and others this operating year, the HRC endowment now totals $8,015,621. A major project underway for the HRC in FY2007 is improvement of the existing online core/log database into a Geoinformatics-compatible, GIS-driven online system. Usage of the HRC has gone up every year and is now very respectable. This year we will strive to raise awareness of the HRC's 100,000-volume geoscience technical library. Our original business model targeted $10 million in endowment; after several years of operation we realize we require an $11 million endowment. We are ''on plan'' and need only $$3 million to fully fund the endowment. To meet these goals in the 2006-2007 operating year will require DOE support for the fifth and final year. DOE support will allow for {approx}$$600k in endowment growth and save using the fund for operation; lack of support will result in a net negative spread of up to $1 million, and set the plan way back. We recognize that DOE budgets for oil and gas research, against best efforts, have been cut substantially this year. Any support available for HRC operation, during continuing resolution or otherwise, would have a very positive impact on this critical final year of the original business plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-06-01
The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guidemore » for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.« less
Rise, Marit B; Steinsbekk, Aslak
2015-10-01
Governments in several countries attempt to strengthen user participation through instructing health-care organizations to implement user participation initiatives. There is, however, little knowledge on the effect on patients' experience from comprehensive plans for enhancing user participation in whole health service organizations. To investigate whether implementing a development plan intending to enhance user participation in a mental hospital had any effect on the patients' experience of user participation. A non-randomized controlled study including patients in three mental hospitals in Central Norway, one intervention hospital and two control hospitals. A development plan intended to enhance user participation was implemented in the intervention hospital as a part of a larger reorganizational process. The plan included establishment of a patient education centre and a user office, purchase of user expertise, appointment of contact professionals for next of kin and improvement of the centre's information and the professional culture. Perceptions of Care, Inpatient Treatment Alliance Scale and questions made for this study. A total of 1651 patients participated. Implementing a development plan in a mental hospital intending to enhance user participation had no significant effect on the patients' experience of user participation. The lack of effect can be due to inappropriate initiatives or challenges in implementation processes. Further research should ensure that initiatives and implementation processes are appropriate to impact the patients' experience. © 2013 John Wiley & Sons Ltd.
FY 2016 - Stockpile Stewardship and Management Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2015-03-01
This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.
43 CFR 11.30 - What does the authorized official do if an assessment is warranted?
Code of Federal Regulations, 2010 CFR
2010-10-01
... NATURAL RESOURCE DAMAGE ASSESSMENTS Assessment Plan Phase § 11.30 What does the authorized official do if... natural resource damages. (b) Purpose. The purpose of the Assessment Plan is to ensure that the assessment... activities performed by the agency or tribe in management of the natural resource. Activities undertaken as...
43 CFR 11.30 - What does the authorized official do if an assessment is warranted?
Code of Federal Regulations, 2011 CFR
2011-10-01
... NATURAL RESOURCE DAMAGE ASSESSMENTS Assessment Plan Phase § 11.30 What does the authorized official do if... natural resource damages. (b) Purpose. The purpose of the Assessment Plan is to ensure that the assessment... activities performed by the agency or tribe in management of the natural resource. Activities undertaken as...
Work Planning and Control - Activity-Based Work Authorization
Good Activity Description Training & Resources WPC Feedback or Help Request DOE and UC Seals DOE UC Home Training FAQ Contact Home Welcome! The purpose of this site is to keep everyone at LBNL connected in the(Training section). Work Planning and Control (WPC) is a program focused on implementing
34 CFR 461.13 - What procedures does a State use to submit its State plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 34 Education 3 2013-07-01 2013-07-01 false What procedures does a State use to submit its State plan? 461.13 Section 461.13 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION ADULT EDUCATION STATE...
34 CFR 461.13 - What procedures does a State use to submit its State plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 34 Education 3 2014-07-01 2014-07-01 false What procedures does a State use to submit its State plan? 461.13 Section 461.13 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION ADULT EDUCATION STATE...
34 CFR 461.13 - What procedures does a State use to submit its State plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 34 Education 3 2012-07-01 2012-07-01 false What procedures does a State use to submit its State plan? 461.13 Section 461.13 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION ADULT EDUCATION STATE...
34 CFR 461.13 - What procedures does a State use to submit its State plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 34 Education 3 2010-07-01 2010-07-01 false What procedures does a State use to submit its State plan? 461.13 Section 461.13 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION ADULT EDUCATION STATE...
34 CFR 461.13 - What procedures does a State use to submit its State plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 34 Education 3 2011-07-01 2011-07-01 false What procedures does a State use to submit its State plan? 461.13 Section 461.13 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION ADULT EDUCATION STATE...
10 CFR 436.107 - Review of plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Operations Plans § 436.107 Review of plan. (a) Each plan or revision of a plan shall be submitted to DOE and... general operations plan under the guidelines will be evaluated with respect to: (1) Adequacy of... 10 Energy 3 2010-01-01 2010-01-01 false Review of plan. 436.107 Section 436.107 Energy DEPARTMENT...
Does Your Health Plan Measure Up? How Can You Tell?
ERIC Educational Resources Information Center
Edwards, Tom
1999-01-01
Describes the process behind health-plan selection for school district employees and offers suggestions on how managers might enhance their current healthcare plan purchasing process. Areas of health-plan review and critique are listed as are tips for measuring plan performance and advice on acquiring backup data on plan quality. (GR)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Brinkman, Bill
2011-05-25
In this video Bill Brinkman, Director of DOE's Office of Science, introduces the session, "Leading Perspectives in Energy Research," at the 2011 EFRC Summit and Forum. During the introduction of the senior representatives from both the public and private sector, Dr. Brinkman explained the motivation for creating the Energy Frontiers Research Centers program. The 2011 EFRC Summit and Forum brought together the EFRC community and science and policy leaders from universities, national laboratories, industry and government to discuss "Science for our Nation's Energy Future." In August 2009, the Office of Science established 46 Energy Frontier Research Centers. The EFRCs aremore » collaborative research efforts intended to accelerate high-risk, high-reward fundamental research, the scientific basis for transformative energy technologies of the future. These Centers involve universities, national laboratories, nonprofit organizations, and for-profit firms, singly or in partnerships, selected by scientific peer review. They are funded at $2 to $5 million per year for a total planned DOE commitment of $777 million over the initial five-year award period, pending Congressional appropriations. These integrated, multi-investigator Centers are conducting fundamental research focusing on one or more of several “grand challenges” and use-inspired “basic research needs” recently identified in major strategic planning efforts by the scientific community. The purpose of the EFRCs is to integrate the talents and expertise of leading scientists in a setting designed to accelerate research that transforms the future of energy and the environment.« less
DOE-NE Proliferation and Terrorism Risk Assessment: FY12 Plans Update
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sadasivan, Pratap
2012-06-21
This presentation provides background information on FY12 plans for the DOE Office of Nuclear Energy Proliferation and Terrorism Risk Assessment program. Program plans, organization, and individual project elements are described. Research objectives are: (1) Develop technologies and other solutions that can improve the reliability, sustain the safety, and extend the life of current reactors; (2) Develop improvements in the affordability of new reactors to enable nuclear energy; (3) Develop Sustainable Nuclear Fuel Cycles; and (4) Understand and minimize the risks of nuclear proliferation and terrorism - Goal is to enable the use of risk information to inform NE R&D programmore » planning.« less
24 CFR 943.128 - How does a consortium carry out planning and reporting functions?
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT PUBLIC HOUSING AGENCY CONSORTIA AND JOINT VENTURES... the consortium agreement, the consortium must submit joint five-year Plans and joint Annual Plans for... the joint PHA Plan. ...
Zhao, Dan; Hu, Qiaoqiao; Qi, Liping; Wang, Juan; Wu, Hao; Zhu, Guangying; Yu, Huiming
2017-02-01
We investigate the impact of magnetic resonance (MR) on the staging and radiotherapy planning for patients with nonsmall cell lung cancer (NSCLC).A total of 24 patients with NSCLC underwent MRI, which was fused with radiotherapy planning CT using rigid registration. Gross tumor volume (GTV) was delineated not only according to CT image alone (GTVCT), but also based on both CT and MR image (GTVCT/MR). For each patient, 2 conformal treatment plans were made according to GTVCT and GTVCT/MR, respectively. Dose-volume histograms (DVH) for lesion and normal organs were generated using both GTVCT and GTVCT/MR treatment plans. All patients were irradiated according to GTVCT/MR plan.Median volume of the GTVCT/MR and GTVCT were 105.42 cm and 124.45 cm, respectively, and the mean value of GTVCT/MR was significantly smaller than that of GTVCT (145.71 ± 145.04 vs 174.30 ± 150.34, P < 0.01). Clinical stage was modified in 9 patients (37.5%). The objective response rate (ORR) was 83.3% and the l-year overall survival (OS) was 87.5%.MR is a useful tool in radiotherapy treatment planning for NSCLC, which improves the definition of tumor volume, reduces organs at risk dose and does not increase the local recurrence rate.
The Circle of Courage[TM] in Transition Planning
ERIC Educational Resources Information Center
Espiner, Deborah; Guild, Diane
2011-01-01
Young people with learning and behaviour disabilities often leave school without transition planning. When planning does occur, there is generally a discrepancy between the goals of students, parents, and professionals. Students requiring higher levels of support may not even be included in the planning process and transition plans are often…
Template for updating regulations in QA manuals
DOE Office of Scientific and Technical Information (OSTI.GOV)
White, M.G.; Banerjee, B.
1992-01-01
Recently, the U.S. Department of Energy (DOE) issued new quality assurance (QA) orders to reflect current policies for conduct and operation of DOE-authorized programs and facilities. Establishing traceability to new QA criteria and requirements from former multidraft orders, QA manuals, and guidance documentation for DOE-funded work can be confusing. Identified critical considerations still must be addressed. Most of the newly stated QA criteria can be cross referenced, where applicable, to former QA plans and manuals. Where additional criteria occur, new procedures may be required, together with revisions in QA plans and manuals.
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kellie, C.L.
This plan establishes the integrated management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford Site Technical Baseline.
Trent Wickman; Ann Acheson
2005-01-01
The Smoke Impact Spreadsheet (SIS) is a simple-to-use planning model for calculating particulate matter (PM) emissions and concentrations downwind of wildland fires. This fact sheet identifies the intended users and uses, required inputs, what the model does and does not do, and tells the user how to obtain the model.
ERIC Educational Resources Information Center
Price-Wright, Demetress LaGale
2013-01-01
There is a growing demand by our society and legislature to educate all students equitably in an inclusive general education setting. Societal trends vary as time progresses, but this does not eliminate the growing debate regarding diploma options, exit requirements and future career planning for high school graduates. What does a future look like…
Johansen, E; Moore, Z; van Etten, M; Strapp, H
2014-07-01
To explore similarities and differences in nurses' views on risk assessment practices and preventive care activities in a context where patients' risk of developing pressure ulcers is assessed using clinical judgment (Norway) and a context where patients' risk of developing pressure ulcers is assessed using a formal structured risk assessment combined with clinical judgement (Ireland). A descriptive, qualitative design was employed across two different care settings with a total of 14 health care workers, nine from Norway and five from Ireland. Regardless of whether risk assessment was undertaken using clinical judgment or formal structured risk assessment, identified risk factors, at risk patients and appropriate preventive initiatives discussed by participant were similar across care settings. Furthermore, risk assessment did not necessarily result in the planning and implementation of appropriate pressure ulcer prevention initiatives. Thus, in this instance, use of a formal risk assessment tool does not seem to make any difference to the planning, initiation and evaluation of pressure ulcer prevention strategies. Regardless of the method of risk assessment, patients at risk of developing pressure ulcers are detected, suggesting that the practice of risk assessment should be re-evaluated. Moreover, appropriate preventive interventions were described. However, the missing link between risk assessment and documented care planning is of concern and barriers to appropriate pressure ulcer documentation should be explored further. This work is partly funded by a research grant from the Norwegian Nurses Organisation (NNO) (Norsk Sykepleierforbund NSF) in 2012. The authors have no conflict of interest to declare.
TRU Waste Management Program. Cost/schedule optimization analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
Detamore, J.A.; Raudenbush, M.H.; Wolaver, R.W.
This Current Year Work Plan presents in detail a description of the activities to be performed by the Joint Integration Office Rockwell International (JIO/RI) during FY86. It breaks down the activities into two major work areas: Program Management and Program Analysis. Program Management is performed by the JIO/RI by providing technical planning and guidance for the development of advanced TRU waste management capabilities. This includes equipment/facility design, engineering, construction, and operations. These functions are integrated to allow transition from interim storage to final disposition. JIO/RI tasks include program requirements identification, long-range technical planning, budget development, program planning document preparation, taskmore » guidance development, task monitoring, task progress information gathering and reporting to DOE, interfacing with other agencies and DOE lead programs, integrating public involvement with program efforts, and preparation of reports for DOE detailing program status. Program Analysis is performed by the JIO/RI to support identification and assessment of alternatives, and development of long-term TRU waste program capabilities. These analyses include short-term analyses in response to DOE information requests, along with performing an RH Cost/Schedule Optimization report. Systems models will be developed, updated, and upgraded as needed to enhance JIO/RI's capability to evaluate the adequacy of program efforts in various fields. A TRU program data base will be maintained and updated to provide DOE with timely responses to inventory related questions.« less
78 FR 21245 - Continuity of Operations Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-10
...; Order No. 778] Continuity of Operations Plan AGENCY: Federal Energy Regulatory Commission, DOE. ACTION: Final rule. SUMMARY: In this Final Rule the Commission revises its Continuity of Operations Plan... Commission's Continuity of Operations Plan (COOP) regulations to incorporate its regional offices into the...
Waste Information Management System with 2012-13 Waste Streams - 13095
DOE Office of Scientific and Technical Information (OSTI.GOV)
Upadhyay, H.; Quintero, W.; Lagos, L.
2013-07-01
The Waste Information Management System (WIMS) 2012-13 was updated to support the Department of Energy (DOE) accelerated cleanup program. The schedule compression required close coordination and a comprehensive review and prioritization of the barriers that impeded treatment and disposition of the waste streams at each site. Many issues related to waste treatment and disposal were potential critical path issues under the accelerated schedule. In order to facilitate accelerated cleanup initiatives, waste managers at DOE field sites and at DOE Headquarters in Washington, D.C., needed timely waste forecast and transportation information regarding the volumes and types of radioactive waste that wouldmore » be generated by DOE sites over the next 40 years. Each local DOE site historically collected, organized, and displayed waste forecast information in separate and unique systems. In order for interested parties to understand and view the complete DOE complex-wide picture, the radioactive waste and shipment information of each DOE site needed to be entered into a common application. The WIMS application was therefore created to serve as a common application to improve stakeholder comprehension and improve DOE radioactive waste treatment and disposal planning and scheduling. WIMS allows identification of total forecasted waste volumes, material classes, disposition sites, choke points, technological or regulatory barriers to treatment and disposal, along with forecasted waste transportation information by rail, truck and inter-modal shipments. The Applied Research Center (ARC) at Florida International University (FIU) in Miami, Florida, developed and deployed the web-based forecast and transportation system and is responsible for updating the radioactive waste forecast and transportation data on a regular basis to ensure the long-term viability and value of this system. (authors)« less
Weiner, Jonathan P; Goodwin, Suzanne M; Chang, Hsien-Yen; Bolen, Shari D; Richards, Thomas M; Johns, Roger A; Momin, Soyal R; Clark, Jeanne M
2013-06-01
Bariatric surgery is a well-documented treatment for obesity, but there are uncertainties about the degree to which such surgery is associated with health care cost reductions that are sustained over time. To provide a comprehensive, multiyear analysis of health care costs by type of procedure within a large cohort of privately insured persons who underwent bariatric surgery compared with a matched nonsurgical cohort. Longitudinal analysis of 2002-2008 claims data comparing a bariatric surgery cohort with a matched nonsurgical cohort. Seven BlueCross BlueShield health insurance plans with a total enrollment of more than 18 million persons. A total of 29 820 plan members who underwent bariatric surgery between January 1, 2002, and December 31, 2008, and a 1:1 matched comparison group of persons not undergoing surgery but with diagnoses closely associated with obesity. Standardized costs (overall and by type of care) and adjusted ratios of the surgical group's costs relative to those of the comparison group. Total costs were greater in the bariatric surgery group during the second and third years following surgery but were similar in the later years. However, the bariatric group's prescription and office visit costs were lower and their inpatient costs were higher. Those undergoing laparoscopic surgery had lower costs in the first few years after surgery, but these differences did not persist. Bariatric surgery does not reduce overall health care costs in the long term. Also, there is no evidence that any one type of surgery is more likely to reduce long-term health care costs. To assess the value of bariatric surgery, future studies should focus on the potential benefit of improved health and well-being of persons undergoing the procedure rather than on cost savings.
Policy Perspective: Meeting the Challenge of the DOE Order 436.1 Departmental Sustainability - 12527
DOE Office of Scientific and Technical Information (OSTI.GOV)
MacDonald, Jennifer C.
2012-07-01
DOE's Sustainability Performance Office is working to meet sustainability goals at DOE by implementing Executive Orders, Departmental policy, the DOE Strategic Sustainability Performance Plan (SSPP) and legislation related to sustainability. Through implementation of Executive Orders, Departmental policy, the SSPP, statutory requirements and regular reporting, analysis and communication, DOE's SPO is working to maintain and expand DOE's leadership in sustainability. (authors)
De-Inventory Plan for Transuranic Waste Stored at Area G
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hargis, Kenneth Marshall; Christensen, Davis V.; Shepard, Mark D.
This report describes the strategy and detailed work plan developed by Los Alamos National Laboratory (LANL) to disposition transuranic (TRU) waste stored at its Area G radioactive waste storage site. The focus at this time is on disposition of 3,706 m 3 of TRU waste stored above grade by June 30, 2014, which is one of the commitments within the Framework Agreement: Realignment of Environmental Priorities between the Department of Energy (DOE) National Nuclear Security Administration (NNSA) and the State of New Mexico Environment Department (NMED), Reference 1. A detailed project management schedule has been developed to manage this workmore » and better ensure that all required activities are aligned and integrated. The schedule was developed in conjunction with personnel from the NNSA Los Alamos Site Office (LASO), the DOE Carlsbad Field Office (CBFO), the Central Characterization Project (CCP), and Los Alamos National Security, LLC (LANS). A detailed project management schedule for the remainder of the above grade inventory and the below grade inventory will be developed and incorporated into the De-Inventory Plan by December 31, 2012. This schedule will also include all newly-generated TRU waste received at Area G in FYs 2012 and 2013, which must be removed by no later than December 31, 2014, under the Framework Agreement. The TRU waste stored above grade at Area G is considered to be one of the highest nuclear safety risks at LANL, and the Defense Nuclear Facility Safety Board has expressed concern for the radioactive material at risk (MAR) contained within the above grade TRU waste inventory and has formally requested that DOE reduce the MAR. A large wildfire called the Las Conchas Fire burned extensive areas west of LANL in late June and July 2011. Although there was minimal to no impact by the fire to LANL, the fire heightened public concern and news media attention on TRU waste storage at Area G. After the fire, New Mexico Governor Susana Martinez also requested that LANL accelerate disposition of TRU waste stored above grade at Area G. The 3,706 m 3 volume of TRU waste stored above grade consists of 4,495 containers that include all above grade non-cemented waste as well as above grade cemented waste that was ready for characterization on October 1, 2011. This volume includes all newly-generated TRU waste currently stored at Area G as of October 1, 2011. This volume does not include the Bolas Grandes spheres, mixed low level waste (MLLW) containers, empty containers, cemented waste that requires remediation, projected newly generated TRU waste from FY 2012 and later, or TRU waste stored below grade. The 3,706 m 3 volume represents about 86 per cent of the total volume of TRU waste stored above grade on October 1, 2011. The De-Inventory Plan supports the DOE Office of Environmental Management (EM) goal to disposition 90% of the Legacy TRU waste within the DOE complex by the end of 2015 as stated in its Roadmap for EM’s Journey to Excellence (Reference 2). The plan also addresses precursor actions for disposition of TRU waste that are necessary for compliance with the Compliance Order on Consent issued by the NMED in 2005 (Reference 3).« less
Energy Systems Integration Facility (ESIF) Facility Stewardship Plan: Revision 2.1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Torres, Juan; Anderson, Art
The U.S. Department of Energy (DOE), Office of Energy Efficiency and Renewable Energy (EERE), has established the Energy Systems Integration Facility (ESIF) on the campus of the National Renewable Energy Laboratory (NREL) and has designated it as a DOE user facility. This 182,500-ft2 research facility provides state-of-the-art laboratory and support infrastructure to optimize the design and performance of electrical, thermal, fuel, and information technologies and systems at scale. This Facility Stewardship Plan provides DOE and other decision makers with information about the existing and expected capabilities of the ESIF and the expected performance metrics to be applied to ESIF operations.more » This plan is a living document that will be updated and refined throughout the lifetime of the facility.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kelly, Elizabeth J.; Stone, Timothy Amos; Smith, Paul Herrick
The Packaging Surveillance Program section of the Department of Energy (DOE) Manual 441.1-1, Nuclear Material Packaging Manual (DOE 2008), requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.”This 2017 update reflects changes to the surveillance plan resulting from surveillance findings as documented in Reeves et al. 2016. These findings include observations of corrosion in SAVY and Hagan containers and the indication (in one SAVY container) of possible filter membrane thermal degradation. This surveillance plan update documents the rationale for selecting surveillance containers, specifiesmore » the containers for 2017 surveillance, and identifies a minimum set of containers for 2018 surveillance. This update contains important changes to the previous surveillance plans.« less
FY2010 ANNUAL REVIEW E-AREA LOW-LEVEL WASTE FACILITY PERFORMANCE ASSESSMENT AND COMPOSITE ANALYSIS
DOE Office of Scientific and Technical Information (OSTI.GOV)
Butcher, T.; Swingle, R.; Crapse, K.
2011-01-01
The E-Area Low-Level Waste Facility (ELLWF) consists of a number of disposal units described in the Performance Assessment (PA)(WSRC, 2008b) and Composite Analysis (CA)(WSRC, 1997; WSRC, 1999): Low-Activity Waste (LAW) Vault, Intermediate Level (IL) Vault, Trenches (Slit Trenches [STs], Engineered Trenches [ETs], and Component-in-Grout [CIG] Trenches), and Naval Reactor Component Disposal Areas (NRCDAs). This annual review evaluates the adequacy of the approved 2008 ELLWF PA along with the Special Analyses (SAs) approved since the PA was issued. The review also verifies that the Fiscal Year (FY) 2010 low-level waste (LLW) disposal operations were conducted within the bounds of the PA/SAmore » baseline, the Savannah River Site (SRS) CA, and the Department of Energy (DOE) Disposal Authorization Statement (DAS). Important factors considered in this review include waste receipts, results from monitoring and research and development (R&D) programs, and the adequacy of controls derived from the PA/SA baseline. Sections 1.0 and 2.0 of this review are a summary of the adequacy of the PA/SA and CA, respectively. An evaluation of the FY2010 waste receipts and the resultant impact on the ELLWF is summarized in Section 3.1. The results of the monitoring program, R&D program, and other relevant factors are found in Section 3.2, 3.3 and 3.4, respectively. Section 4.0 contains the CA annual determination similarly organized. SRS low-level waste management is regulated under DOE Order 435.1 (DOE, 1999a) and is authorized under a DAS as a federal permit. The original DAS was issued by the DOE-Headquarters (DOE-HQ) on September 28, 1999 (DOE, 1999b) for the operation of the ELLWF and the Saltstone Disposal Facility (SDF). The 1999 DAS remains in effect for the regulation of the SDF. Those portions of that DAS applicable to the ELLWF were superseded by revision 1 of the DAS on July 15, 2008 (DOE, 2008b). The 2008 PA and DAS were officially implemented by the facility on October 31, 2008 and are the authorization documents for this FY2010 Annual Review. Department of Energy Headquarters approval of the 2008 DAS was subject to numerous conditions specified in the document. Two of those conditions are to update the ELLWF closure plan and monitoring plan to align with the conceptual model analyzed in the PA. Both of these conditions were met with the issuance of the PA Monitoring Plan (Millings, 2009a) and the Closure Plan (Phifer et al, 2009a). The PA Monitoring Plan was approved by DOE on July 22, 2009 and the Closure Plan was approved by DOE on May 21, 2009. Both will be updated as needed to remain consistent with the PA. The DAS also specifies that the maintenance plan include activities to resolve each of the secondary issues identified in the DOEHQ review of the 2008 PA that were not completely addressed either with supplemental material provided to the review team or in final revisions to the PA. These outstanding issues were originally documented in the 2008 update of the PA/CA Maintenance Plan (WSRC, 2008a) and in subsequent PA/CA Maintenance Plans (most recently SRNS, 2010a) as required and are actively being worked.« less
Safety analysis and review system (SARS) assessment report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Browne, E.T.
1981-03-01
Under DOE Order 5481.1, Safety Analysis and Review System for DOE Operations, safety analyses are required for DOE projects in order to ensure that: (1) potential hazards are systematically identified; (2) potential impacts are analyzed; (3) reasonable measures have been taken to eliminate, control, or mitigate the hazards; and (4) there is documented management authorization of the DOE operation based on an objective assessment of the adequacy of the safety analysis. This report is intended to provide the DOE Office of Plans and Technology Assessment (OPTA) with an independent evaluation of the adequacy of the ongoing safety analysis effort. Asmore » part of this effort, a number of site visits and interviews were conducted, and FE SARS documents were reviewed. The latter included SARS Implementation Plans for a number of FE field offices, as well as safety analysis reports completed for certain FE operations. This report summarizes SARS related efforts at the DOE field offices visited and evaluates the extent to which they fulfill the requirements of DOE 5481.1.« less
18 CFR 5.13 - Revised study plan and study plan determination.
Code of Federal Regulations, 2014 CFR
2014-04-01
... differences over study requests. If the potential applicant does not adopt a requested study, it must explain... deadline for filing comments on the potential applicant's proposed study plan, as provided for in § 5.12, the potential applicant must file a revised study plan for Commission approval. The revised study plan...
18 CFR 5.13 - Revised study plan and study plan determination.
Code of Federal Regulations, 2013 CFR
2013-04-01
... differences over study requests. If the potential applicant does not adopt a requested study, it must explain... deadline for filing comments on the potential applicant's proposed study plan, as provided for in § 5.12, the potential applicant must file a revised study plan for Commission approval. The revised study plan...
18 CFR 5.13 - Revised study plan and study plan determination.
Code of Federal Regulations, 2012 CFR
2012-04-01
... differences over study requests. If the potential applicant does not adopt a requested study, it must explain... deadline for filing comments on the potential applicant's proposed study plan, as provided for in § 5.12, the potential applicant must file a revised study plan for Commission approval. The revised study plan...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-12-01
The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Latham, Brent
The purpose of the Cooperative Agreement was based on the mission the two agencies have in common. The Association of Village Council Presidents (AVCP) has been a critical player in accomplishing what Alaskan Native communities need since 1964 with various programs including energy assistance. The AVCP/DOE Partnership enabled AVCP to assist 10 of 56 remote Alaska Native villages in the development of a community-led Community Energy Plan. These plans have empowered the 10 Tribes to address their own energy development needs. The community energy plans that AVCP assisted the communities with identified the community’s energy vision, goals, and a highmore » level project timeline of each goal. The plans also include the technical potential, resource assessment, grant and technical assistance resources. The AVCP/DOE Partnership also enabled AVCP to provide tribal leaders and staff from the 56 Federally-Recognized Tribes with information about the policies and programs of the Department, support regional workshops and forums, and provide directed technical assistance for initial energy project support.« less
Configuration management program plan for Hanford site systems engineering
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hoffman, A.G.
This plan establishes the integrated configuration management program for the evolving technical baseline developed through the systems engineering process. This configuration management program aligns with the criteria identified in the DOE Standard, DOE-STD-1073-93. Included are specific requirements for control of the systems engineering RDD-100 database, and electronic data incorporated in the database that establishes the Hanford site technical baseline.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Does the Secretary approve project planning and design documents prepared by the Self-Governance Tribe? 137.360 Section 137.360 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Does the Secretary approve project planning and design documents prepared by the Self-Governance Tribe? 137.360 Section 137.360 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE...
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Does the Secretary have any other opportunities to approve planning or design documents prepared by the Self-Governance Tribe? 137.361 Section 137.361 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL...
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Does the Secretary have any other opportunities to approve planning or design documents prepared by the Self-Governance Tribe? 137.361 Section 137.361 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL...
Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-03-01
This long-term surveillance plan (LTSP) for the Durango, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Durango (Bodo Canyon) disposal site, which will be referred to as the disposal site throughout this document. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal site continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). RRMs include tailings and other uranium ore processing wastesmore » still at the site, which the DOE determines to be radioactive. This LTSP is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992).« less
Initial planning of monorail development in Medan
NASA Astrophysics Data System (ADS)
Surbakti, M. S.
2018-03-01
Medan City is the third largest city in Indonesia after Jakarta and Surabaya. With a total area of 265.10 km2 and a population of 2.1 million people, it is proper that Medan City has operated a mass transportation system, which can accommodate the needs of the city movement. The current transportation system is dominated by a paratransit that has a capacity of 12 passengers. In fact, the data released by Ditlantas Poldasu and the Department of Transportation of Medan City shows that in 2013 the total number of passenger vehicles is 408,877 units, 99% of which are private vehicles, and there are only 1580 public transport. Planning the bus as a public transportation system in the city of Medan who tried to integrate it with the surrounding cities until now has not been done. One of the problems is the overlap of the bus route with existing public transport routes. This raises resistance from organda as an association of public transport operators located in the city of Medan. Bappeda Medan City in the Year 2014 has done the initial planning of monorail development in Medan City. The results of the study show that economically monorail development is feasible to be implemented and does not compete directly with the existing public transport system. This happens because 90% of monorail routes are in median ring road Medan City, which predicted the next 20 years will experience a large loading.
Collaborative Strategic Planning: Myth or Reality?
ERIC Educational Resources Information Center
Mbugua, Flora; Rarieya, Jane F. A.
2014-01-01
The concept and practice of strategic planning, while entrenched in educational institutions in the West, is just catching on in Kenya. While literature emphasizes the importance of collaborative strategic planning, it does not indicate the challenges presented by collaboratively engaging in strategic planning. This article reports on findings of…
40 CFR 52.274 - California air pollution emergency plan.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 3 2013-07-01 2013-07-01 false California air pollution emergency plan... pollution emergency plan. (a) Since the California Air Pollution Emergency Plan does not provide complete... District (SCAQMD). (2) Sacramento County Air Pollution Control District. (3) Monterey Bay Unified APCD...
40 CFR 52.274 - California air pollution emergency plan.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 3 2012-07-01 2012-07-01 false California air pollution emergency plan... pollution emergency plan. (a) Since the California Air Pollution Emergency Plan does not provide complete... District (SCAQMD). (2) Sacramento County Air Pollution Control District. (3) Monterey Bay Unified APCD...
40 CFR 52.274 - California air pollution emergency plan.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 3 2014-07-01 2014-07-01 false California air pollution emergency plan... pollution emergency plan. (a) Since the California Air Pollution Emergency Plan does not provide complete... District (SCAQMD). (2) Sacramento County Air Pollution Control District. (3) Monterey Bay Unified APCD...
40 CFR 52.274 - California air pollution emergency plan.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 3 2011-07-01 2011-07-01 false California air pollution emergency plan... pollution emergency plan. (a) Since the California Air Pollution Emergency Plan does not provide complete... District (SCAQMD). (2) Sacramento County Air Pollution Control District. (3) Monterey Bay Unified APCD...
Planning for What Kind of Teaching? Supporting Cooperating Teachers as Teachers of Planning
ERIC Educational Resources Information Center
Norman, Patricia J.
2011-01-01
Planning is a central task of teaching and a central focus in learning to teach. But what does planning entail, and how is planning best learned? What challenges do experienced teachers serving as school-based teacher educators face in becoming teachers of planning? What role can university teacher educators play in helping mentor teachers learn…
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Department of Energy’s (DOE) National Nuclear Security Administration (NNSA) Fiscal Year Stockpile Stewardship and Management Plan (SSMP) is a key planning document for the nuclear security enterprise.
29 CFR 2590.712 - Parity in mental health and substance use disorder benefits.
Code of Federal Regulations, 2013 CFR
2013-07-01
.../surgical benefits related to cardio-pulmonary diseases. The plan does not include an annual dollar limit on... plan payments for medical/surgical benefits are related to cardio-pulmonary diseases. The plan...
29 CFR 2590.712 - Parity in mental health and substance use disorder benefits.
Code of Federal Regulations, 2012 CFR
2012-07-01
.../surgical benefits related to cardio-pulmonary diseases. The plan does not include an annual dollar limit on... plan payments for medical/surgical benefits are related to cardio-pulmonary diseases. The plan...
45 CFR 146.136 - Parity in mental health and substance use disorder benefits.
Code of Federal Regulations, 2011 CFR
2011-10-01
.../surgical benefits related to cardio-pulmonary diseases. The plan does not include an annual dollar limit on... plan payments for medical/surgical benefits are related to cardio-pulmonary diseases. The plan...
45 CFR 146.136 - Parity in mental health and substance use disorder benefits.
Code of Federal Regulations, 2013 CFR
2013-10-01
.../surgical benefits related to cardio-pulmonary diseases. The plan does not include an annual dollar limit on... plan payments for medical/surgical benefits are related to cardio-pulmonary diseases. The plan...
45 CFR 146.136 - Parity in mental health and substance use disorder benefits.
Code of Federal Regulations, 2012 CFR
2012-10-01
.../surgical benefits related to cardio-pulmonary diseases. The plan does not include an annual dollar limit on... plan payments for medical/surgical benefits are related to cardio-pulmonary diseases. The plan...
29 CFR 2590.712 - Parity in mental health and substance use disorder benefits.
Code of Federal Regulations, 2011 CFR
2011-07-01
.../surgical benefits related to cardio-pulmonary diseases. The plan does not include an annual dollar limit on... plan payments for medical/surgical benefits are related to cardio-pulmonary diseases. The plan...
Performance measurement: A tool for program control
NASA Technical Reports Server (NTRS)
Abell, Nancy
1994-01-01
Performance measurement is a management tool for planning, monitoring, and controlling as aspects of program and project management--cost, schedule, and technical requirements. It is a means (concept and approach) to a desired end (effective program planning and control). To reach the desired end, however, performance measurement must be applied and used appropriately, with full knowledge and recognition of its power and of its limitations--what it can and cannot do for the project manager. What is the potential of this management tool? What does performance measurement do that a traditional plan vs. actual technique cannot do? Performance measurement provides an improvement over the customary comparison of how much money was spent (actual cost) vs. how much was planned to be spent based on a schedule of activities (work planned). This commonly used plan vs. actual comparison does not allow one to know from the numerical data if the actual cost incurred was for work intended to be done.
Congress split on best way to reshape network of labs
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lawler, A.
Reducing the size of the federal bureaucracy was a bread-and -butter issue for the Republicans who took over Congress in January. And the Department of Energy`s (DOE`s) $6 billion network of national laboratories seemed like a tempting morsel. But 9 months later, congressional plates are loaded down with competing plans to reform the DOE labs, and the issue is giving majority members a case of indigestion. Their discomfort seems likely to delay adoption of any reform plans until at least next year. This article discusses the broad alternatives and possibilities for the future.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Elvado Environmental LLC; Environmental Compliance Department Environment, Safety, and Health Division Y-12 National Security Complex
This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with themore » multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of BWXT Y-12, L.L.C. (hereafter referenced as BWXT), the Y-12 management and operations (M&O) contractor for DOE. This GWPP management plan addresses the requirements of DOE Order 450.1 (BWXT Y12 S/RID) regarding the implementation of a site-wide approach for groundwater protection at each DOE facility. Additionally, this plan is a ''living'' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bush, T.S.
1995-03-01
In December 1992, the Department of Energy (DOE) implemented the DOE Radiological Control Manual (RCM). Westinghouse Idaho Nuclear Company, Inc. (WINCO) submitted an implementation plan showing how compliance with the manual would be achieved. This implementation plan was approved by DOE in November 1992. Although WINCO had already been working under a similar Westinghouse RCM, the DOE RCM brought some new and challenging requirements. One such requirement was that of having procedure writers and job planners create the radiological input in work control procedures. Until this time, that information was being provided by radiological engineering or a radiation safety representative.more » As a result of this requirement, Westinghouse developed the Radiological Evaluation Decision Input (REDI) program.« less
State trends in ecological risk assessment and standard setting
DOE Office of Scientific and Technical Information (OSTI.GOV)
Siegel, M R; Fowler, K M; Bilyard, G R
1993-02-01
The purposes of this paper are (1) to identify key states' activities and plans related to setting cleanup standards using the ecological risk assessment process, and (2) to discuss the impacts these actions may have on the US Department of Energy's (DOE's) environmental restoration program. This report is prepared as part of a larger task, the purpose of which is to identify and assess state regulatory trends and legal developments that may impact DOE's environmental restoration program. Results of this task are intended to provide DOE with advance notice of potentially significant regulatory developments so as to enhance DOE's abilitymore » to influence these developments and to incorporate possible regulatory and policy changes into its planning process.« less
Paulu, D; Alaei, P
2012-06-01
To evaluate the ability of treatment planning algorithm to accurately predict dose delivered at the interface of high density implanted devices. A high density (7.6 g/cc) Cobalt-Chromium-Molybdenum hip prosthesis was molded into an epoxy-based cylindrical leg phantom. The phantom was designed to be separated in half to access the prosthesis and to place the TLDs. Using MVCT to image the apparatus, a simple treatment plan was developed using the Philips Pinnacle treatment planning system. Wires were placed in the molded epoxy to allow for accurate definition of measurement sites (TLD positions) along the surface of the prosthesis. Micro-cube TLDs (1 mm 3 ) were placed at six measurement locations for which the dose had been calculated by the treatment planning system. An Elekta Synergy linear accelerator was used to deliver a 400 cGy plan to the phantom with 6 MV photons in a single fraction. A total of four 10 cm × 21 cm fields were used at 0, 90, 180, and 270 degree gantry rotations. Initial results indicate that the measured dose is 7-17% lower than the dose calculated by the treatment planning system. Further study using high energy beams are also in progress. Initial results indicate that the treatment planning system does predict the dose near a high density prosthetic device within 10-15% but underestimates the dose. The results of this study could help in designing treatment plans which would reduce the uncertainty of the dose delivered in the vicinity of prosthetic hip implants and similar devices. © 2012 American Association of Physicists in Medicine.
Interdependencies and Risks at the Nexus of Energy, Water, and Land Systems
NASA Astrophysics Data System (ADS)
Geernaert, G. L.
2016-12-01
During recent years, the federal agencies have rallied around efforts to understand and predict the interdependencies involving various combinations of energy infrastructure and supply, water supply and quality, and land use that combines agriculture and food production. The US Department of Energy has, in particular, focused on the energy-water nexus, with specific goals to understand the degree of interdependence that leads to multi-sector risk and, in the worst case, the precursors that can lead to cascading failure. Determining thresholds for system interdependence, evaluating the impact of drought on systems, and planning for robust mitigation options to avert future risks, are among DOE's highest research priorities. In this presentation, the DOE program plan and its rationale will be described; and the DOE plan will be placed in context of broader efforts across the federal government.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AND GENERAL OPERATING RULES SPECIAL AIR TRAFFIC RULES Washington, DC Metropolitan Area Special Flight Rules Area § 93.335 Definitions. For purposes of this subpart— DC FRZ flight plan is a flight plan filed... the DC FRZ. This flight plan is separate and distinct from a standard VFR flight plan, and does not...
40 CFR 52.123 - Approval status.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Urban Planning Area for O3. (e) The Administrator finds that the plan does not satisfy all the... pollutants listed in this paragraph. (1) Maricopa County Urban Planning Area for CO and TSP. (2) [Reserved... TSP, the portion of the Tucson TSP Air Planning Area falling both within the area described by...
40 CFR 52.123 - Approval status.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Urban Planning Area for O3. (e) The Administrator finds that the plan does not satisfy all the... pollutants listed in this paragraph. (1) Maricopa County Urban Planning Area for CO and TSP. (2) [Reserved... TSP, the portion of the Tucson TSP Air Planning Area falling both within the area described by...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 4 2012-01-01 2012-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 4 2014-01-01 2014-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 4 2011-01-01 2011-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
10 CFR 1021.331 - Mitigation action plans.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 4 2013-01-01 2013-01-01 false Mitigation action plans. 1021.331 Section 1021.331 Energy... Implementing Procedures § 1021.331 Mitigation action plans. (a) Following completion of each EIS and its associated ROD, DOE shall prepare a Mitigation Action Plan that addresses mitigation commitments expressed in...
40 CFR 68.180 - Emergency response program.
Code of Federal Regulations, 2011 CFR
2011-07-01
... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...
40 CFR 68.180 - Emergency response program.
Code of Federal Regulations, 2013 CFR
2013-07-01
... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...
40 CFR 68.180 - Emergency response program.
Code of Federal Regulations, 2012 CFR
2012-07-01
... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...
40 CFR 68.180 - Emergency response program.
Code of Federal Regulations, 2014 CFR
2014-07-01
... activities and the emergency response plan is coordinated. (c) The owner or operator shall list other Federal... (CONTINUED) CHEMICAL ACCIDENT PREVENTION PROVISIONS Risk Management Plan § 68.180 Emergency response program... written emergency response plan? (2) Does the plan include specific actions to be taken in response to an...
Health and safety plan for the Environmental Restoration Program at Oak Ridge National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Clark, C. Jr.; Burman, S.N.; Cipriano, D.J. Jr.
1994-08-01
This Programmatic Health and Safety plan (PHASP) is prepared for the U.S. Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) Environmental Restoration (ER) Program. This plan follows the format recommended by the U.S. Environmental Protection Agency (EPA) for remedial investigations and feasibility studies and that recommended by the EM40 Health and Safety Plan (HASP) Guidelines (DOE February 1994). This plan complies with the Occupational Safety and Health Administration (OSHA) requirements found in 29 CFR 1910.120 and EM-40 guidelines for any activities dealing with hazardous waste operations and emergency response efforts and with OSHA requirements found in 29 CFR 1926.65.more » The policies and procedures in this plan apply to all Environmental Restoration sites and activities including employees of Energy Systems, subcontractors, and prime contractors performing work for the DOE ORNL ER Program. The provisions of this plan are to be carried out whenever activities are initiated that could be a threat to human health or the environment. This plan implements a policy and establishes criteria for the development of procedures for day-to-day operations to prevent or minimize any adverse impact to the environment and personnel safety and health and to meet standards that define acceptable management of hazardous and radioactive materials and wastes. The plan is written to utilize past experience and best management practices to minimize hazards to human health and safety and to the environment from event such as fires, explosions, falls, mechanical hazards, or any unplanned release of hazardous or radioactive materials to air, soil, or surface water.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Beauchesne, A.M.
1997-12-31
Topics explored through this project include: decisions involving disposal of mixed, low-level, and transuranic (TRU) waste and disposition of nuclear materials; decisions involving DOE budget requests and their effect on environmental cleanup and compliance at DOE facilities; strategies to treat mixed, low-level, and transuranic (TRU) waste and their effect on individual sites in the complex; changes to the FFCA site treatment plans as a result of proposals in the EM 2006 cleanup plans and contractor integration analysis; interstate waste and materials shipments; and reforms to existing RCRA and CERCLA regulations/guidance to address regulatory overlap and risks posed by DOE wastes.more » The work accomplished by the NGA project team during the past four months can be categorized as follows: maintained open communication with DOE on a variety of activities and issues within the DOE environmental management complex; and maintained communication with NGA Federal Facilities Compliance Task Force members regarding DOE efforts to formulate a configuration for mixed low-level waste and low-level treatment and disposal, DOE activities in the area of the Hazardous Waste Identification Rule, and DOE`s proposed National Dialogue.« less
NASA Technical Reports Server (NTRS)
Maldague, Pierre; Page, Dennis; Chase, Adam
2005-01-01
Activity Plan Generator (APGEN), now at version 5.0, is a computer program that assists in generating an integrated plan of activities for a spacecraft mission that does not oversubscribe spacecraft and ground resources. APGEN generates an interactive display, through which the user can easily create or modify the plan. The display summarizes the plan by means of a time line, whereon each activity is represented by a bar stretched between its beginning and ending times. Activities can be added, deleted, and modified via simple mouse and keyboard actions. The use of resources can be viewed on resource graphs. Resource and activity constraints can be checked. Types of activities, resources, and constraints are defined by simple text files, which the user can modify. In one of two modes of operation, APGEN acts as a planning expert assistant, displaying the plan and identifying problems in the plan. The user is in charge of creating and modifying the plan. In the other mode, APGEN automatically creates a plan that does not oversubscribe resources. The user can then manually modify the plan. APGEN is designed to interact with other software that generates sequences of timed commands for implementing details of planned activities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false How may an Indian tribe use net gaming revenues if it... an Indian tribe use net gaming revenues if it does not have an approved tribal revenue allocation plan? Without an approved tribal revenue allocation plan, you may use net gaming revenues to fund...
ERIC Educational Resources Information Center
Careless, James
2007-01-01
Enterprise resource planning (ERP) software does what school leaders have always wanted their computer systems to do: It sees all. By integrating every IT application an organization has--from purchasing and inventory control to payroll--ERPs create a single unified system. Not only does this give IT managers a holistic view to what is happening…
ERIC Educational Resources Information Center
Careless, James
2007-01-01
Enterprise resource planning software does what school leaders have always wanted their computer systems to do: It sees all. By integrating every IT application an organization has--from purchasing and inventory control to payroll--ERPs create a single unified system. Not only does this give IT managers a holistic view to what is happening in the…
Johnston, Kenton J; Hockenberry, Jason M; Rask, Kimberly J; Cunningham, Lynn; Brigham, Kenneth L; Martin, Greg S
2015-08-01
To evaluate the impact of a pilot workplace health partner intervention delivered by a predictive health institute to university and academic medical center employees on per-member, per-month health care expenditures. We analyzed the health care claims of participants versus nonparticipants, with a 12-month baseline and 24-month intervention period. Total per-member, per-month expenditures were analyzed using two-part regression models that controlled for sex, age, health benefit plan type, medical member months, and active employment months. Our regression results found no statistical differences in total expenditures at baseline and intervention. Further sensitivity analyses controlling for high cost outliers, comorbidities, and propensity to be in the intervention group confirmed these findings. We find no difference in health care expenditures attributable to the health partner intervention. The intervention does not seem to have raised expenditures in the short term.
McGann v. H & H Music Company.
1990-06-28
The U.S. District Court held that the plaintiff-employee's rights under the Federal Employee Retirement Income Security Act (ERISA) were not violated when his employer decided to become self-insured and to reduce maximum lifetime medical benefits from $1,000,000 to $5,000 for employees with AIDS. The purpose of ERISA is to protect the solvency of employee benefit plans. ERISA does not mandate that employers provide any particular benefits nor does it prohibit changes to health plan benefits. In order to demonstrate discrimination under ERISA, an employee must show that plan changes were made for the purpose of interfering with the rights to which an employee may become entitled. The court held that the defendant complied with the purpose and requirements of ERISA when it provided each employee with a summary plan description, notifying them that the employer could terminate or amend the plan at any time. Because the plan had suffered serious financial loses in recent years, the defendant had to make changes in the plan or terminate it.
Use of target-date funds in 401(k) plans, 2007.
Copeland, Craig
2009-03-01
WHAT THEY ARE: Target-date funds (also called "life-cycle" funds) are a type of mutual fund that automatically rebalances its asset allocation following a predetermined pattern over time. They typically rebalance to more conservative and income-producing assets as the participant's target date of retirement approaches. WHY THEY'RE IMPORTANT AND GROWING: Of the 401(k) plan participants in the EBRI/ICI 401(k) database who were found to be in plans that offeredtarget-date funds, 37 percent had at least some fraction of their account in target-date funds in 2007. Target-date funds held about 7 percent of total assets in 401(k) plans and the use of these funds is expected to increase in the future. The Pension Protection Act of 2006 made it easier for plan sponsors to automatically enroll new workers in a 401(k) plan, and target-date funds were one of the types of approved funds specified for a "default" investment if the participant does not elect a choice. BRI/ICI 401(K) DATABASE: This study uses the unique richness of the data in the EBRI/ICI Participant-Directed Retirement Plan Data Collection Project, which has almost 22 million participants, to examine the choices and characteristics of participants whose plans offer target-date funds. EFFECT OF AGE, SALARY, JOB TENURE, AND ACCOUNT BALANCE: Younger workers are significantly more likely to invest in target-date funds than are older workers: Almost 44 percent of participants under age 30 had assets in a target-date fund, compared with 27 percent of those 60 or older. Target-date funds appeal to those with lower incomes, little time on the job, and with few assets. On average, target-date fund investors are about 2.5 years younger than those who do not invest in target-date funds, have about 3.5 years less tenure, make about $11,000 less in salary, have $25,000 less in their account, and are in smaller plans. EFFECT OF AUTOMATIC ENROLLMENT: While the EBRI/ICI database does not contain specific information on whether a 401(k) plan had automatic enrollment, this analysis was able to proxy for those who could be identified as automatically enrolled. The data show that workers who were considered to be automatically enrolled in their employer's 401(k) plan are significantly more likely to invest all their assets in a target-date fund than those who voluntarily joined, and were also less likely to have extreme all-or-nothing asset allocations to equities. EQUITY ALLOCATIONS AND FUND FAMILIES: One of the major questions surrounding target-date funds is the equity allocations that these funds use over time (the so-called "glide path") as a participant's retirement target date approaches. The glide paths of different target-date funds have significantly different shapes and starting/ending equity allocations. As of 2007, the equity allocation ranges from about 80-90 percent for 2040 funds (for workers about 30 years away from retirement), and from 26-66 percent for 2010 funds (for workers one year away from retirement)--a 40 percentage-point difference. Moreover, the fund families change their relative rank in equity allocation within the different fund years. This analysis finds that the relative rank of the equity allocation within a target-date fund does not appear to affect the percentage of participants investing all their account into that fund. Nevertheless, investors in specific fund families are more likely to invest all their assets in a single target-date fund from that family.
Code of Federal Regulations, 2011 CFR
2011-07-01
..., evaluate, and review the SEO compensation plans and employee compensation plans to ensure that the SEO... SEO compensation plans and employee compensation plans to ensure that the SEO compensation plans do... identify the features in the TARP recipient's SEO compensation plans that could lead SEOs to take these...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This plan covers robotics Research, Development, Demonstration, Testing, activities in the Program for the next five years. These activities range from bench-scale R D to fullscale hot demonstrations at DOE sites. This plan outlines applications of existing technology to near-term needs, the development and application of enhanced technology for longer-term needs, and an initiation of advanced technology development to meet those needs beyond the five-year plan. The objective of the Robotic Technology Development (RTDP) is to develop and apply robotics technologies that will enable Environmental Restoration and Waste Management operations at DOE sites to be safer, faster and cheaper. Fivemore » priority DOE sites were visited in March 1990 to identify needs for robotics technology in ER WM operations. This 5-Year Program Plan for the RTDP detailed annual plans for robotics technology development based on identified needs. This 5-Year Program Plan discusses the overall approach to be adopted by the RTDP to aggressively develop robotics technology and contains discussions of the Program Management Plan, Site Visit and Needs Summary, Approach to Needs-Directed Technical Development, Application-Specific Technical Development, and Cross-Cutting and Advanced Technology. Integrating application-specific ER WM needs, the current state of robotics technology, and the potential benefits (in terms of faster, safer, and cheaper) of new technology, the Plan develops application-specific road maps for robotics RDDT E for the period FY 1991 through FY 1995. In addition, the Plan identifies areas where longer-term research in robotics will have a high payoff in the 5- to 20-year time frame. 12 figs.« less
Perspectives in Energy Research: How Can We Change the Game? (2011 Summit)
Isaacs, Eric
2018-02-12
Eric Issacs, Director of DOE's Argonne National Laboratory, discussed the role of the EFRC Program and National Laboratories in developing game-changing energy technologies in the EFRC Summit session titled "Leading Perspectives in Energy Research." The 2011 EFRC Summit and Forum brought together the EFRC community and science and policy leaders from universities, national laboratories, industry and government to discuss "Science for our Nation's Energy Future." In August 2009, the Office of Science established 46 Energy Frontier Research Centers. The EFRCs are collaborative research efforts intended to accelerate high-risk, high-reward fundamental research, the scientific basis for transformative energy technologies of the future. These Centers involve universities, national laboratories, nonprofit organizations, and for-profit firms, singly or in partnerships, selected by scientific peer review. They are funded at $2 to $5 million per year for a total planned DOE commitment of $777 million over the initial five-year award period, pending Congressional appropriations. These integrated, multi-investigator Centers are conducting fundamental research focusing on one or more of several âgrand challengesâ and use-inspired âbasic research needsâ recently identified in major strategic planning efforts by the scientific community. The purpose of the EFRCs is to integrate the talents and expertise of leading scientists in a setting designed to accelerate research that transforms the future of energy and the environment.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-24
... ">[email protected] hq.doe.gov . Michael Holland, Office of the Under Secretary for Science at (202) 586-0505, or e-mail [email protected]science.doe.gov . SUPPLEMENTARY INFORMATION: The DOE was established in... clear goals for DOE's four main business lines: nuclear security, environmental clean-up, science and...
The, Bertram; Verdonschot, Nico; van Horn, Jim R; van Ooijen, Peter M A; Diercks, Ron L
2007-09-01
The objective of this randomized clinical trial was to compare the clinical and technical results of digital preoperative planning for primary total hip arthroplasties with analogue planning. Two hundred and ten total hip arthroplasties were randomized. All plans were constructed on standardized radiographs by the surgeon who performed the arthroplasty the next day. The main outcome was accuracy of the preoperative plan. Secondary outcomes were operation time and a radiographic assessment of the arthroplasty. Digital preoperative plans were more accurate in planning the cup (P < .05) and scored higher on the postoperative radiologic assessment of cemented cup (P = .03) and stem (P < .01) components. None of the other comparisons reached statistical significance. We conclude that digital plans slightly outperform analogue plans.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Purpose of this Strategic Petroleum Reserve (SPR) Plan Amendment is to provide a Distribution Plan, setting forth the method of drawdown and distribution of the Reserve. Chapter VII of the SPR Plan contained a Distribution Plan which identified and discussed the major objectives, criteria and other factors that will be considered in developing the detailed plan. This Amendment replaces Chapter VII of the SPR Plan in its entirety.
Effective protection of open space: does planning matter?
Steelman, Toddi A; Hess, George R
2009-07-01
High quality plans are considered a crucial part of good land use planning and often used as a proxy measure for success in plan implementation and goal attainment. We explored the relationship of open space plan quality to the implementation of open space plans and attainment of open space protection goals in Research Triangle, North Carolina, USA. To measure plan quality, we used a standard plan evaluation matrix that we modified to focus on open space plans. We evaluated all open space plans in the region that contained a natural resource protection element. To measure plan implementation and open space protection, we developed an online survey and administered it to open space planners charged with implementing the plans. The survey elicited each planner's perspective on aspects of open space protection in his or her organization. The empirical results (1) indicate that success in implementation and attaining goals are not related to plan quality, (2) highlight the importance of when and how stakeholders are involved in planning and implementation processes, and (3) raise questions about the relationship of planning to implementation. These results suggest that a technically excellent plan does not guarantee the long-term relationships among local land owners, political and appointed officials, and other organizations that are crucial to meeting land protection goals. A greater balance of attention to the entire decision process and building relationships might lead to more success in protecting open space.
Code of Federal Regulations, 2011 CFR
2011-07-01
... senior risk officers, the SEO compensation plans to ensure that these plans do not encourage SEOs to take... officer (SEO) compensation plans and has made all reasonable efforts to ensure that these plans do not... committee must provide a narrative description identifying each SEO compensation plan and explaining how the...
Laboratory Directed Research and Development Program FY 2008 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
editor, Todd C Hansen
2009-02-23
The Ernest Orlando Lawrence Berkeley National Laboratory (Berkeley Lab or LBNL) is a multi-program national research facility operated by the University of California for the Department of Energy (DOE). As an integral element of DOE's National Laboratory System, Berkeley Lab supports DOE's missions in fundamental science, energy resources, and environmental quality. Berkeley Lab programs advance four distinct goals for DOE and the nation: (1) To perform leading multidisciplinary research in the computing sciences, physical sciences, energy sciences, biosciences, and general sciences in a manner that ensures employee and public safety and protection of the environment. (2) To develop and operatemore » unique national experimental facilities for qualified investigators. (3) To educate and train future generations of scientists and engineers to promote national science and education goals. (4) To transfer knowledge and technological innovations and to foster productive relationships among Berkeley Lab's research programs, universities, and industry in order to promote national economic competitiveness. Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2008 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). The LDRD program supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the Office of Science Program Offices, such as LDRD projects germane to new research facility concepts and new fundamental science directions. Berkeley Lab LDRD program also play an important role in leveraging DOE capabilities for national needs. The fundamental scientific research and development conducted in the program advances the skills and technologies of importance to our Work For Others (WFO) sponsors. Among many directions, these include a broad range of health-related science and technology of interest to the National Institutes of Health, breast cancer and accelerator research supported by the Department of Defense, detector technologies that should be useful to the Department of Homeland Security, and particle detection that will be valuable to the Environmental Protection Agency. The Berkeley Lab Laboratory Directed Research and Development Program FY2008 report is compiled from annual reports submitted by principal investigators following the close of the fiscal year. This report describes the supported projects and summarizes their accomplishments. It constitutes a part of the LDRD program planning and documentation process that includes an annual planning cycle, project selection, implementation, and review.« less
26 CFR 1.419A(f)(6)-1 - Exception for 10 or more employer plan.
Code of Federal Regulations, 2011 CFR
2011-04-01
... employers; (iii) That does not maintain an experience-rating arrangement with respect to any individual... information. A plan satisfies the requirements of this paragraph (a)(2) if the plan is maintained pursuant to a written document that requires the plan administrator to maintain records sufficient for the...
26 CFR 1.419A(f)(6)-1 - Exception for 10 or more employer plan.
Code of Federal Regulations, 2012 CFR
2012-04-01
... employers; (iii) That does not maintain an experience-rating arrangement with respect to any individual... information. A plan satisfies the requirements of this paragraph (a)(2) if the plan is maintained pursuant to a written document that requires the plan administrator to maintain records sufficient for the...
34 CFR 644.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2011 CFR
2011-07-01
... provided under paragraph (a) of this section, and attainable, given the project's plan of operation, budget... applications. (c) Plan of operation (30 points). The Secretary evaluates the quality of the applicant's plan of operation on the basis of the following: (1) (4 points) The plan to inform the residents, schools, and...
34 CFR 644.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2012 CFR
2012-07-01
... provided under paragraph (a) of this section, and attainable, given the project's plan of operation, budget... applications. (c) Plan of operation (30 points). The Secretary evaluates the quality of the applicant's plan of operation on the basis of the following: (1) (4 points) The plan to inform the residents, schools, and...
34 CFR 644.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2013 CFR
2013-07-01
... provided under paragraph (a) of this section, and attainable, given the project's plan of operation, budget... applications. (c) Plan of operation (30 points). The Secretary evaluates the quality of the applicant's plan of operation on the basis of the following: (1) (4 points) The plan to inform the residents, schools, and...
34 CFR 644.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2014 CFR
2014-07-01
... provided under paragraph (a) of this section, and attainable, given the project's plan of operation, budget... applications. (c) Plan of operation (30 points). The Secretary evaluates the quality of the applicant's plan of operation on the basis of the following: (1) (4 points) The plan to inform the residents, schools, and...
Nevada National Security Site Integrated Groundwater Sampling Plan, Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wilborn, Bill R.; Boehlecke, Robert F.
The purpose is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the DOE/EM Nevada Program’s UGTA Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP) (NNSA/NFO, 2015); Federal Facility Agreement and Consent Order (FFACO) (1996, as amended); and DOE Order 458.1, Radiation Protection of the Public and the Environment (DOE, 2013). The Plan’s scope comprises sample collection and analysis requirementsmore » relevant to assessing both the extent of groundwater contamination from underground nuclear testing and impact of testing on water quality in downgradient communities. This Plan identifies locations to be sampled by CAU and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well purging, detection levels, and accuracy requirements/recommendations; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling analytes of interest to UGTA. Information used in the Plan development—including the rationale for selection of wells, sampling frequency, and the analytical suite—is discussed under separate cover (N-I, 2014) and is not reproduced herein. This Plan does not address compliance for those wells involved in a permitted activity. Sampling and analysis requirements associated with these wells are described in their respective permits and are discussed in NNSS environmental reports (see Section 5.2). In addition, sampling for UGTA CAUs that are in the Closure Report (CR) stage are not included in this Plan. Sampling requirements for these CAUs are described in the CR. Frenchman Flat is currently the only UGTA CAU in the CR stage. Sampling requirements for this CAU are described in Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada (NNSA/NFO, 2016).« less
Geotechnical support and topical studies for nuclear waste geologic repositories
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-01-01
The present report lists the technical reviews and comments made during the fiscal year 1988 and summarizes the technical progress of the topical studies. In the area of technical assistance, there were numerous activities detailed in the next section. These included 24 geotechnical support activities, including reviews of 6 Study Plans (SP) and participation in 6 SP Review Workshops, review of one whole document Site Characterization Plan (SCP) and participation in the Assembled Document SCP Review Workshops by 6 LBL reviewers; the hosting of a DOE program review, the rewriting of the project statement of work, 2 trips to technicalmore » and planning meetings; preparation of proposed work statements for two new topics for DOE, and 5 instances of technical assistance to DOE. These activities are described in a Table in the following section entitled Geoscience Technical Support for Nuclear Waste Geologic Repositories.''« less
Waste treatability guidance program. User`s guide. Revision 0
DOE Office of Scientific and Technical Information (OSTI.GOV)
Toth, C.
1995-12-21
DOE sites across the country generate and manage radioactive, hazardous, mixed, and sanitary wastes. It is necessary for each site to find the technologies and associated capacities required to manage its waste. One role of DOE HQ Office of Environmental Restoration and Waste Management is to facilitate the integration of the site- specific plans into coherent national plans. DOE has developed a standard methodology for defining and categorizing waste streams into treatability groups based on characteristic parameters that influence waste management technology needs. This Waste Treatability Guidance Program automates the Guidance Document for the categorization of waste information into treatabilitymore » groups; this application provides a consistent implementation of the methodology across the National TRU Program. This User`s Guide provides instructions on how to use the program, including installations instructions and program operation. This document satisfies the requirements of the Software Quality Assurance Plan.« less
Autonomy, liberalism and advance care planning.
Ikonomidis, S; Singer, P A
1999-01-01
The justification for advance directives is grounded in the notion that they extend patient autonomy into future states of incompetency through patient participation in decision making about end-of-life care. Four objections challenge the necessity and sufficiency of individual autonomy, perceived to be a defining feature of liberal philosophical theory, as a basis of advance care planning. These objections are that the liberal concept of autonomy (i) implies a misconception of the individual self, (ii) entails the denial of values of social justice, (iii) does not account for justifiable acts of paternalism, and (iv) does not account for the importance of personal relationships in the advance care planning process. The last objection is especially pertinent in light of recent empirical research highlighting the importance of personal relationships in advance care planning. This article examines these four objections to autonomy, and the liberal theoretical framework with which it is associated, in order to re-evaluate the philosophical basis of advance care planning. We argue that liberal autonomy (i) is not a misconceived concept as critics assume, (ii) does not entail the denial of values of social justice, (iii) can account for justifiable acts of paternalism, though it (iv) is not the best account of the value of personal relationships that arise in advance care planning. In conclusion, we suggest that liberalism is a necessary component of a theoretical framework for advance care planning but that it needs to be supplemented with theories that focus explicitly on the significance of personal relationships. PMID:10635509
Oil reserve: status of Strategic Petroleum Reserve activities as of December 31, 1985
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report discusses events and activities related to the administration's progress in filling, developing, and operating the Strategic Petroleum Reserve (SPR) during the first quarter of fiscal year 1986. Specifically, it notes that: DOE added 4.5 million barrels of oil to the SPR, bringing the total to 493.3 million barrels. The oil fill rate averaged about 49,000 barrels per day during the quarter. DOE made payments of $178 million for oil acquisition and transportation, had unpaid obligations of about $140 million, and had about $668 million in unobligated funds. The storage capacity development program proceeded during the quarter; however, themore » West Hackberry, Louisiana site's leaching program was stopped in December due to a leak in the brine disposal line. DOE held an SPR drawdown test sale and distribution exercise. Approximately 1 million barrels of oil were competitively sold to oil company bidders and subsequently withdrawn from DOE storage sites for delivery. The Congress passed a continuing resolution for fiscal year 1986 providing about $113 million for continued construction of storage capacity as directed by the fiscal year 1985 Supplemental Appropriations Act. On December 27, 1985, DOE formally notified cognizant congressional committees that it was planning to submit a deferral of funds for SPR storage facilities development. This report also presents information on (1) the implementation of recommendations made in the DOE Oak Ridge Operations Office's reports on its baseline assessment of the SPR Project Office and its review of allegations about mismanagement or misconduct within the SPR program, (2) DOE's compliance with the Cargo Preference Act of 1954 during the 1985 crude oil procurement program, (3) DOE's program to analyze the quality of oil in filled storage caverns, and (4) DOE's pipeline construction and marine terminal enhancements to improve the SPR oil distribution system.« less
Explanation-based generalization of partially ordered plans
NASA Technical Reports Server (NTRS)
Kambhampati, Subbarao; Kedar, Smadar
1991-01-01
Most previous work in analytic generalization of plans dealt with totally ordered plans. These methods cannot be directly applied to generalizing partially ordered plans, since they do not capture all interactions among plan operators for all total orders of such plans. We introduce a new method for generalizing partially ordered plans. This method is based on providing explanation-based generalization (EBG) with explanations which systematically capture the interactions among plan operators for all the total orders of a partially-ordered plan. The explanations are based on the Modal Truth Criterion which states the necessary and sufficient conditions for ensuring the truth of a proposition at any point in a plan, for a class of partially ordered plans. The generalizations obtained by this method guarantee successful and interaction-free execution of any total order of the generalized plan. In addition, the systematic derivation of the generalization algorithms from the Modal Truth Criterion obviates the need for carrying out a separate formal proof of correctness of the EBG algorithms.
PLAN2D - A PROGRAM FOR ELASTO-PLASTIC ANALYSIS OF PLANAR FRAMES
NASA Technical Reports Server (NTRS)
Lawrence, C.
1994-01-01
PLAN2D is a FORTRAN computer program for the plastic analysis of planar rigid frame structures. Given a structure and loading pattern as input, PLAN2D calculates the ultimate load that the structure can sustain before collapse. Element moments and plastic hinge rotations are calculated for the ultimate load. The location of hinges required for a collapse mechanism to form are also determined. The program proceeds in an iterative series of linear elastic analyses. After each iteration the resulting elastic moments in each member are compared to the reserve plastic moment capacity of that member. The member or members that have moments closest to their reserve capacity will determine the minimum load factor and the site where the next hinge is to be inserted. Next, hinges are inserted and the structural stiffness matrix is reformulated. This cycle is repeated until the structure becomes unstable. At this point the ultimate collapse load is calculated by accumulating the minimum load factor from each previous iteration and multiplying them by the original input loads. PLAN2D is based on the program STAN, originally written by Dr. E.L. Wilson at U.C. Berkeley. PLAN2D has several limitations: 1) Although PLAN2D will detect unloading of hinges it does not contain the capability to remove hinges; 2) PLAN2D does not allow the user to input different positive and negative moment capacities and 3) PLAN2D does not consider the interaction between axial and plastic moment capacity. Axial yielding and buckling is ignored as is the reduction in moment capacity due to axial load. PLAN2D is written in FORTRAN and is machine independent. It has been tested on an IBM PC and a DEC MicroVAX. The program was developed in 1988.
Summary of findings of the R&D committee
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kenley, C.R.; Kokenge, B.R.
1996-05-01
In March 1995, the Department of Energy`s (DOE) Nuclear Materials Stabilization Task Group (NMST) chartered a committee to formulate a research and development (R&D) plan in response to Sub-recommendation (2) of Defense Nuclear Facilities Safety Board (DNFSB) Recommendation 94-1. The NMSTG was established as an organizational unit operating under the auspices of the DOE Office of the Environmental Management. As a result of its efforts, the Research Committee concluded that, in general, the technology needs for stabilizing 94-1 nuclear materials are being adequately met by existing or planned DOE programs. At the same time, the committee, in the form ofmore » recommendations, noted specific R&D program areas that should be addressed by the NMSTG. These recommendations are documented in the R&D plan and formulated based on: (1) existing {open_quotes}gaps{close_quotes} in DOE`s R&D stabilization program, (2) the relative maturity of various technologies, and (3) other important R&D program issues that, in the judgement of the committee, should be addressed by the NMSTG. A systems engineering approach, derived form the aerospace industry, was applied to the various stabilization technologies to assess their relative maturity and availability for use in treating 94-1 nuclear materials.« less
Ghasemian, Mohammad; Poursafa, Parinaz; Amin, Mohammad Mehdi; Ziarati, Mohammad; Ghoddousi, Hamid; Momeni, Seyyed Alireza; Rezaei, Amir Hossein
2012-01-01
The purpose of this study is environmental impact assessment of the industrial estate development planning. This cross-sectional study was conducted in 2010 in Isfahan province, Iran. GIS and matrix methods were applied. Data analysis was done to identify the current situation of the region, zoning vulnerable areas, and scoping the region. Quantitative evaluation was done by using matrix of Wooten and Rau. The net score for impact of industrial units operation on air quality of the project area was (-3). According to the transition of industrial estate pollutants, residential places located in the radius of 2500 meters of the city were expected to be affected more. The net score for impact of construction of industrial units on plant species of the project area was (-2). Environmental protected areas were not affected by the air and soil pollutants because of their distance from industrial estate. Positive effects of project activities outweigh the drawbacks and the sum scores allocated to the project activities on environmental factor was (+37). Totally it does not have detrimental effects on the environment and residential neighborhood. EIA should be considered as an anticipatory, participatory environmental management tool before determining a plan application.
DOE Office of Scientific and Technical Information (OSTI.GOV)
The U.S. Department of Energy (DOE) and U.S. General Services Administration (GSA) are issuing comprehensive guidance on the federal fleet requirements of Executive Order (E.O.) 13693, Planning for Federal Sustainability in the Next Decade (E.O. 13693), to help federal agencies subject to the executive order develop an overall approach for reducing total fleet greenhouse gas (GHG) emissions and fleet-wide per-mile GHG emissions, and ensure the approach helps these agencies meet their requirements. Three key GHG emissions reduction strategies - right-sizing fleets to mission, increasing fleet fuel efficiency, and displacing petroleum with alternative fuel use - are essential to meeting themore » requirements and are discussed further in this document. This guidance document is intended to help agency Chief Sustainability Officers (CSOs) and headquarters fleet managers craft tailored executable plans that achieve the purpose of E.O. 13693. The guidance will assist agencies in completing the first phase of a comprehensive fleet management framework by identifying the strategies each agency will then implement to meet or exceed its requirements.« less
Planned Closeout of the Cf-252 Loan/Lease Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sherman, Steven R; Patton, Bradley D
2012-09-01
New funding is sought to pursue planned closeout of the Cf-252 Loan Program. The work will be performed in phases. In the initial phase, users will be surveyed to determine whether they wish to take ownership of sources in their possession, or return them. In the second phase, sources will be recalled from non-DOE entities, and source ownership transfers will be performed. In the third phase, the remaining sources from DOE entities will be recalled. Initial funding of $350K is sought to fund the first phase, and to plan execution of the remaining phases given information collected from user surveys.
20 CFR 639.2 - What does WARN require?
Code of Federal Regulations, 2011 CFR
2011-04-01
... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false What does WARN require? 639.2 Section 639.2 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION, DEPARTMENT OF LABOR WORKER ADJUSTMENT AND RETRAINING NOTIFICATION § 639.2 What does WARN require? WARN requires employers who are planning a plant...
10 CFR 905.22 - How does Western periodically evaluate customer actions?
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 4 2010-01-01 2010-01-01 false How does Western periodically evaluate customer actions... Resource Planning § 905.22 How does Western periodically evaluate customer actions? (a) Periodic review of customer actions. Western will periodically evaluate customer actions to determine whether they are...
40 CFR 267.50 - Does this subpart apply to me?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 26 2010-07-01 2010-07-01 false Does this subpart apply to me? 267.50 Section 267.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... PERMIT Contingency Plan and Emergency Procedures § 267.50 Does this subpart apply to me? This subpart...
40 CFR 267.50 - Does this subpart apply to me?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 27 2011-07-01 2011-07-01 false Does this subpart apply to me? 267.50 Section 267.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... PERMIT Contingency Plan and Emergency Procedures § 267.50 Does this subpart apply to me? This subpart...
40 CFR 267.50 - Does this subpart apply to me?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Does this subpart apply to me? 267.50 Section 267.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... PERMIT Contingency Plan and Emergency Procedures § 267.50 Does this subpart apply to me? This subpart...
40 CFR 267.50 - Does this subpart apply to me?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Does this subpart apply to me? 267.50 Section 267.50 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES... PERMIT Contingency Plan and Emergency Procedures § 267.50 Does this subpart apply to me? This subpart...
Does Your Planning Communicate Action? Or, Is Your Strategic Plan a Coffee Table Book?
ERIC Educational Resources Information Center
Osborn, Frances P.
Monroe Community College (MCC) has been involved in strategic planning over the last 4 years. The following lessons have been drawn from these 4 years of experience: (1) all plans need to be seen as temporary; (2) no plan drawn up in the planner's office could be implemented if it ignored the fleeting, ambiguous nature of the college's and…
Environmental hazards assessment program. Annual report, July 1, 1994--June 30, 1995
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-07-31
This report describes activities and reports on progress for the third year of the DOE grant to support the Environmental Hazards Assessment Program (EHAP). It reports progress against grant objectives and the Program Implementation Plan published at the end of the first year of the grant. As the program has evolved, more projects have been funded and many existing projects have become more complex. Thus, to accomplish better the objectives over the years and retain a solid focus on the total mission, we have reorganized the grant effort from three to five majoe elements: Public and professional outreach; Clinical programs;more » Science programs; Information systems; and, Program management.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This Remedial Investigation (RI) Work Plan has been developed as part of the US Department of Energy`s (DOE`s) investigation of the Groundwater Operable Unit (GWOU) at Oak Ridge National Laboratory (ORNL) located near Oak Ridge, Tennessee. The first iteration of the GWOU RI Work Plan is intended to serve as a strategy document to guide the ORNL GWOU RI. The Work Plan provides a rationale and organization for groundwater data acquisition, monitoring, and remedial actions to be performed during implementation of environmental restoration activities associated with the ORNL GWOU. It Is important to note that the RI Work Plan formore » the ORNL GWOU is not a prototypical work plan. The RI will be conducted using annual work plans to manage the work activities, and task reports will be used to document the results of the investigations. Sampling and analysis results will be compiled and reported annually with a review of data relative to risk (screening level risk assessment review) for groundwater. This Work Plan outlines the overall strategy for the RI and defines tasks which are to be conducted during the initial phase of investigation. This plan is presented with the understanding that more specific addenda to the plan will follow.« less
48 CFR 970.1907-1 - Subcontracting plan requirements.
Code of Federal Regulations, 2010 CFR
2010-10-01
... SUPPLEMENTARY REGULATIONS DOE MANAGEMENT AND OPERATING CONTRACTS Small, Small Disadvantaged and Women-Owned Small Business Concerns 970.1907-1 Subcontracting plan requirements. Pursuant to the clause at 48 CFR 52.219-9, Small Business Subcontracting Plan, which is required for all management and operating...
43 CFR 11.31 - What does the Assessment Plan include?
Code of Federal Regulations, 2011 CFR
2011-10-01
....31 Section 11.31 Public Lands: Interior Office of the Secretary of the Interior NATURAL RESOURCE.... The Assessment Plan shall include descriptions of the natural resources and the geographical areas... co-trusteeship, for those natural resources considered within the Assessment Plan. The authorized...
29 CFR 1952.374 - Final approval determination.
Code of Federal Regulations, 2012 CFR
2012-07-01
... plan does not cover private sector maritime employment; worksites located within Federal military... under the Federal program; to submit plan supplements in accordance with 29 CFR part 1953; to allocate..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.374...
29 CFR 1952.313 - Final approval determination.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 1902. Accordingly, the Hawaii plan was granted final approval and concurrent Federal enforcement... employment in Hawaii. The plan does not cover maritime employment in the private sector; Federal government... effective as operations under the Federal program; to submit plan supplements in accordance with 29 CFR part...
29 CFR 1952.374 - Final approval determination.
Code of Federal Regulations, 2013 CFR
2013-07-01
... plan does not cover private sector maritime employment; worksites located within Federal military... under the Federal program; to submit plan supplements in accordance with 29 CFR part 1953; to allocate..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.374...
29 CFR 1952.294 - Final approval determination.
Code of Federal Regulations, 2013 CFR
2013-07-01
.... Accordingly, the Nevada plan was granted final approval and concurrent Federal enforcement authority was... Nevada. The plan does not cover Federal government employers and employees; any private sector maritime... under the Federal program; to submit plan supplements in accordance with 29 CFR Part 1953; to allocate...
29 CFR 1952.294 - Final approval determination.
Code of Federal Regulations, 2010 CFR
2010-07-01
.... Accordingly, the Nevada plan was granted final approval and concurrent Federal enforcement authority was... Nevada. The plan does not cover Federal government employers and employees; any private sector maritime... under the Federal program; to submit plan supplements in accordance with 29 CFR Part 1953; to allocate...
29 CFR 1952.374 - Final approval determination.
Code of Federal Regulations, 2010 CFR
2010-07-01
... plan does not cover private sector maritime employment; worksites located within Federal military... under the Federal program; to submit plan supplements in accordance with 29 CFR part 1953; to allocate..., DEPARTMENT OF LABOR (CONTINUED) APPROVED STATE PLANS FOR ENFORCEMENT OF STATE STANDARDS Virginia § 1952.374...
ERIC Educational Resources Information Center
Wunnava, Shalini
2011-01-01
In today's information intensive and networked world, Disaster Recovery Planning (DRP) is a critical and significant activity. However, DRP does not always receive the attention it deserves. Therefore, it is critical to examine the factors that influence the undertaking of disaster recovery planning. A model on disaster recovery planning was…
9 CFR 318.309 - Finished product inspection.
Code of Federal Regulations, 2011 CFR
2011-01-01
... be handled according to: (1) A HACCP plan for canned product that addresses hazards associated with... HACCP plan for thermally processed/commercially sterile product does not address food safety hazards...
Code of Federal Regulations, 2014 CFR
2014-10-01
... appropriations and Commission expenditures. 10005.9 Section 10005.9 Public Lands: Interior Regulations Relating... Relationship of the plan to congressional appropriations and Commission expenditures. (a) The plan itself does... dependent upon Congressional appropriation, and, following this, Commission approval of specific projects...
Code of Federal Regulations, 2012 CFR
2012-10-01
... appropriations and Commission expenditures. 10005.9 Section 10005.9 Public Lands: Interior Regulations Relating... Relationship of the plan to congressional appropriations and Commission expenditures. (a) The plan itself does... dependent upon Congressional appropriation, and, following this, Commission approval of specific projects...
Code of Federal Regulations, 2013 CFR
2013-10-01
... appropriations and Commission expenditures. 10005.9 Section 10005.9 Public Lands: Interior Regulations Relating... Relationship of the plan to congressional appropriations and Commission expenditures. (a) The plan itself does... dependent upon Congressional appropriation, and, following this, Commission approval of specific projects...
Code of Federal Regulations, 2011 CFR
2011-10-01
... appropriations and Commission expenditures. 10005.9 Section 10005.9 Public Lands: Interior Regulations Relating... Relationship of the plan to congressional appropriations and Commission expenditures. (a) The plan itself does... dependent upon Congressional appropriation, and, following this, Commission approval of specific projects...
ERIC Educational Resources Information Center
New York City Board of Education, Brooklyn, NY. Div. of Curriculum and Instruction.
This manual for secondary school teachers offers sample lesson plans that may be used to guide and stimulate experimentation and development of creative instructional units. Lesson plan components are defined, and various types of lessons and their significant characteristics are identified. These characteristic types of lessons are illustrated,…
23 CFR 420.103 - How does the FHWA define the terms used in this part?
Code of Federal Regulations, 2011 CFR
2011-04-01
... the Transportation Research Board, National Academy of Sciences. Procurement contract means a legal...? 420.103 Section 420.103 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PLANNING AND RESEARCH PLANNING AND RESEARCH PROGRAM ADMINISTRATION Administration of FHWA Planning and Research...
44 CFR 78.11 - Minimum project eligibility criteria.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...
44 CFR 78.11 - Minimum project eligibility criteria.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...
44 CFR 78.11 - Minimum project eligibility criteria.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...
44 CFR 78.11 - Minimum project eligibility criteria.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD... activity in an approved Flood Mitigation Plan does not mean it meets FMA eligibility criteria. Projects... with the Flood Mitigation Plan; the type of project being proposed must be identified in the plan. (f...
Total Quality Management Office for Contracting Integrity Implementation Plan
1989-07-01
REPORT______ANDDATESCOVERED 4. TITLE AND SUBTITLE S. FUNDING NUMBERS Total Quality Management Office for Contracting Integrity Implementatiun Plan 6. AUTHOR(S) 7...01-280-5500 Standard Form 298 (Rev. 2-89) P’,croed 1:, ANSI Std 3J9-16 29d. 102 4 TOTAL QUALITY MANAGEMENT OFFICE FOR CONTRACTING INTEGRITY...IMPLEMENTATION PLAN According to the Total Quality Management (TQM) Master Plan, each PSE head, supported by Working Groups, will implement the HQ DLA Master
DOE Office of Scientific and Technical Information (OSTI.GOV)
ITLV.
1999-03-01
The Corrective Action Investigation Plan for Corrective Action Unit 428, Area 3 Septic Waste Systems 1 and 5, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U. S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 428 consists of Corrective Action Sites 03- 05- 002- SW01 and 03- 05- 002- SW05, respectively known as Area 3 Septic Waste System 1 and Septic Waste System 5. This Corrective Action Investigation Plan is used inmore » combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada , Rev. 1 (DOE/ NV, 1998c). The Leachfield Work Plan was developed to streamline investigations at leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 428. A system of leachfields and associated collection systems was used for wastewater disposal at Area 3 of the Tonopah Test Range until a consolidated sewer system was installed in 1990 to replace the discrete septic waste systems. Operations within various buildings at Area 3 generated sanitary and industrial wastewaters potentially contaminated with contaminants of potential concern and disposed of in septic tanks and leachfields. Corrective Action Unit 428 is composed of two leachfield systems in the northern portion of Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include oil/ diesel range total petroleum hydrocarbons, and Resource Conservation and Recovery Act characteristic volatile organic compounds, semivolatile organic compounds, and metals. A limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from four of the septic tanks and if radiological field screening levels are exceeded. Additional samples will be analyzed for geotechnical and hydrological properties and a bioassessment may be performed. The technical approach for investigating this Corrective Action Unit consists of the following activities: Perform video surveys of the discharge and outfall lines. Collect samples of material in the septic tanks. Conduct exploratory trenching to locate and inspect subsurface components. Collect subsurface soil samples in areas of the collection system including the septic tanks and outfall end of distribution boxes. Collect subsurface soil samples underlying the leachfield distribution pipes via trenching. Collect surface and near- surface samples near potential locations of the Acid Sewer Outfall if Septic Waste System 5 Leachfield cannot be located. Field screen samples for volatile organic compounds, total petroleum hydrocarbons, and radiological activity. Drill boreholes and collect subsurface soil samples if required. Analyze samples for total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and total petroleum hydrocarbons (oil/ diesel range organics). Limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from particular septic tanks and if radiological field screening levels are exceeded. Collect samples from native soils beneath the distribution system and analyze for geotechnical/ hydrologic parameters. Collect and analyze bioassessment samples at the discretion of the Site Supervisor if total petroleum hydrocarbons exceed field- screening levels.« less
300 Area dangerous waste tank management system: Compliance plan approach. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-03-01
In its Dec. 5, 1989 letter to DOE-Richland (DOE-RL) Operations, the Washington State Dept. of Ecology requested that DOE-RL prepare ``a plant evaluating alternatives for storage and/or treatment of hazardous waste in the 300 Area...``. This document, prepared in response to that letter, presents the proposed approach to compliance of the 300 Area with the federal Resource Conservation and Recovery Act and Washington State`s Chapter 173-303 WAC, Dangerous Waste Regulations. It also contains 10 appendices which were developed as bases for preparing the compliance plan approach. It refers to the Radioactive Liquid Waste System facilities and to the radioactive mixedmore » waste.« less
In April 2014, U.S. Environmental Protection Agency (EPA) environmental monitoring and assessment team members reviewed DOE's air sampling plan, visited DOE's air samplers and placed air samplers onsite near existing DOE samplers to corroborate results.
Information Systems Education: What's Missing?
ERIC Educational Resources Information Center
Rosenthal, Paul H.
2010-01-01
We are doing a good job of teaching IS technology and project management but are omitting implementation planning. We need to teach our users and professionals how to answer the following critical questions for our mission-critical transaction processing applications (TPS). (1) Why does it cost so much? (2) How long does it take-Why does it take…
ERIC Educational Resources Information Center
Mueller, Tracy Gershwin; Bassett, Diane S.; Brewer, Robin D.
2012-01-01
The Individuals with Disabilities Education Act (IDEA) mandates the implementation of a behavior intervention plan based on a functional behavioral assessment when a student's behavior necessitates disciplinary actions. However, IDEA does not provide any clear guidelines as to what the plans should contain nor how they can address behaviors that…
Typical and Atypical (Cerebral Palsy) Development of Unimanual and Bimanual Grasp Planning
ERIC Educational Resources Information Center
Janssen, Loes; Steenbergen, Bert
2011-01-01
In the present study we tested 13 children with cerebral palsy (CP) and 24 typically developing children (7-12 years old) in a unimanual and bimanual motor planning task. We focused on two research questions: (1) How does motor planning develop in children with and without CP? and (2) Is motor planning facilitated when the task is performed with…
77 FR 22376 - Airport Improvement Program (AIP) Grant Assurances
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-13
.... Additionally, the FAA is amending paragraph (a) of Sponsor Assurance 29, Airport Layout Plan, to require that... be depicted on the airport layout plan (ALP). This includes all residential and commercial through... the statutory grant assurance relating to airport layout plans to provide that a sponsor does not have...
34 CFR 401.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2012 CFR
2012-07-01
... enrollees upon completion; (4) Demonstrates the active commitment in the project's planning and operation by... meet those needs. (c) Plan of operation. (15 points) The Secretary reviews each application to determine the quality of the plan of operation for the project, including— (1) The establishment of...
34 CFR 401.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2014 CFR
2014-07-01
... enrollees upon completion; (4) Demonstrates the active commitment in the project's planning and operation by... meet those needs. (c) Plan of operation. (15 points) The Secretary reviews each application to determine the quality of the plan of operation for the project, including— (1) The establishment of...
34 CFR 377.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Secretary use? The Secretary uses the following criteria to evaluate an application: (a) Plan of operation. (30 points) The Secretary reviews each application to determine the quality of the plan of operation... outcomes; (2) The extent to which the plan of operation specifies the methodology for accomplishing each...
34 CFR 377.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2013 CFR
2013-07-01
... Secretary use? The Secretary uses the following criteria to evaluate an application: (a) Plan of operation. (30 points) The Secretary reviews each application to determine the quality of the plan of operation... outcomes; (2) The extent to which the plan of operation specifies the methodology for accomplishing each...
34 CFR 401.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2013 CFR
2013-07-01
... enrollees upon completion; (4) Demonstrates the active commitment in the project's planning and operation by... meet those needs. (c) Plan of operation. (15 points) The Secretary reviews each application to determine the quality of the plan of operation for the project, including— (1) The establishment of...
34 CFR 421.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2014 CFR
2014-07-01
.... (c) Plan of operation. (15 points) The Secretary reviews each application to determine the quality of the plan of operation for the project, including the extent to which— (1) The plan of management will... are selected without regard to race, color, national origin, gender, age, or disability. (d...
34 CFR 421.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2012 CFR
2012-07-01
.... (c) Plan of operation. (15 points) The Secretary reviews each application to determine the quality of the plan of operation for the project, including the extent to which— (1) The plan of management will... are selected without regard to race, color, national origin, gender, age, or disability. (d...
34 CFR 377.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2014 CFR
2014-07-01
... Secretary use? The Secretary uses the following criteria to evaluate an application: (a) Plan of operation. (30 points) The Secretary reviews each application to determine the quality of the plan of operation... outcomes; (2) The extent to which the plan of operation specifies the methodology for accomplishing each...
34 CFR 421.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2013 CFR
2013-07-01
.... (c) Plan of operation. (15 points) The Secretary reviews each application to determine the quality of the plan of operation for the project, including the extent to which— (1) The plan of management will... are selected without regard to race, color, national origin, gender, age, or disability. (d...
34 CFR 377.21 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2011 CFR
2011-07-01
... Secretary use? The Secretary uses the following criteria to evaluate an application: (a) Plan of operation. (30 points) The Secretary reviews each application to determine the quality of the plan of operation... outcomes; (2) The extent to which the plan of operation specifies the methodology for accomplishing each...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-22
... the California State Implementation Plan, South Coast Air Quality Management District AGENCY... the South Coast Air Quality Management District portion of the California State Implementation Plan... Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993); Does not...
48 CFR 52.219-9 - Small business subcontracting plan.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 48 Federal Acquisition Regulations System 2 2010-10-01 2010-10-01 false Small business... Clauses 52.219-9 Small business subcontracting plan. As prescribed in 19.708(b), insert the following clause: Small Business Subcontracting Plan (OCT 2010) (a) This clause does not apply to small business...
43 CFR 11.32 - How does the authorized official develop the Assessment Plan?
Code of Federal Regulations, 2012 CFR
2012-10-01
... briefly describe, to the extent known, the site, vessel, or facility involved, the discharge of oil or... Assessment Plan available for review by any identified potentially responsible parties, other natural... until after this review period. (2) Any comments concerning the Assessment Plan received from identified...
43 CFR 11.32 - How does the authorized official develop the Assessment Plan?
Code of Federal Regulations, 2013 CFR
2013-10-01
... briefly describe, to the extent known, the site, vessel, or facility involved, the discharge of oil or... Assessment Plan available for review by any identified potentially responsible parties, other natural... until after this review period. (2) Any comments concerning the Assessment Plan received from identified...
43 CFR 11.32 - How does the authorized official develop the Assessment Plan?
Code of Federal Regulations, 2014 CFR
2014-10-01
... briefly describe, to the extent known, the site, vessel, or facility involved, the discharge of oil or... Assessment Plan available for review by any identified potentially responsible parties, other natural... until after this review period. (2) Any comments concerning the Assessment Plan received from identified...
29 CFR 2510.3-101 - Definition of “plan assets”-plan investments.
Code of Federal Regulations, 2014 CFR
2014-07-01
... requirement does not prevent transfer of all of the then remaining shares or units held by an investor; (ii... instruments of established, creditworthy companies that are purchased privately by institutional investors. V... (ii) Equity participation in the entity by benefit plan investors is not significant. Therefore, any...
29 CFR 2510.3-101 - Definition of “plan assets”-plan investments.
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirement does not prevent transfer of all of the then remaining shares or units held by an investor; (ii... instruments of established, creditworthy companies that are purchased privately by institutional investors. V... (ii) Equity participation in the entity by benefit plan investors is not significant. Therefore, any...
29 CFR 2510.3-101 - Definition of “plan assets”-plan investments.
Code of Federal Regulations, 2013 CFR
2013-07-01
... requirement does not prevent transfer of all of the then remaining shares or units held by an investor; (ii... instruments of established, creditworthy companies that are purchased privately by institutional investors. V... (ii) Equity participation in the entity by benefit plan investors is not significant. Therefore, any...
13 CFR 124.402 - How does a Participant develop a business plan?
Code of Federal Regulations, 2014 CFR
2014-01-01
... Participant must develop a comprehensive business plan setting forth its business targets, objectives, and... future plans to enter into one or more new markets; (2) The applicant's designation of its primary... the concern from receiving and performing non-8(a) contracts; (5) Specific targets, objectives, and...
13 CFR 124.402 - How does a Participant develop a business plan?
Code of Federal Regulations, 2013 CFR
2013-01-01
... Participant must develop a comprehensive business plan setting forth its business targets, objectives, and... future plans to enter into one or more new markets; (2) The applicant's designation of its primary... the concern from receiving and performing non-8(a) contracts; (5) Specific targets, objectives, and...
13 CFR 124.402 - How does a Participant develop a business plan?
Code of Federal Regulations, 2011 CFR
2011-01-01
... Participant must develop a comprehensive business plan setting forth its business targets, objectives, and... future plans to enter into one or more new markets; (2) The applicant's designation of its primary... the concern from receiving and performing non-8(a) contracts; (5) Specific targets, objectives, and...
13 CFR 124.402 - How does a Participant develop a business plan?
Code of Federal Regulations, 2012 CFR
2012-01-01
... Participant must develop a comprehensive business plan setting forth its business targets, objectives, and... future plans to enter into one or more new markets; (2) The applicant's designation of its primary... the concern from receiving and performing non-8(a) contracts; (5) Specific targets, objectives, and...
13 CFR 124.402 - How does a Participant develop a business plan?
Code of Federal Regulations, 2010 CFR
2010-01-01
... Participant must develop a comprehensive business plan setting forth its business targets, objectives, and... future plans to enter into one or more new markets; (2) The applicant's designation of its primary industry classification, as defined in § 124.3; (3) An analysis of market potential, competitive...
Excessive Positivism in Person-Centered Planning
ERIC Educational Resources Information Center
Holburn, Steve; Cea, Christine D.
2007-01-01
This paper illustrates the positivistic nature of person-centered planning (PCP) that is evident in the planning methods employed, the way that individuals with disabilities are described, and in portrayal of the outcomes of PCP. However, a confluence of factors can lead to manifestation of excessive positivism that does not serve PCP…
Restructuring to Sustain Excellence.
ERIC Educational Resources Information Center
Myers, Richard S.
1996-01-01
The process of restructuring a higher education institution does not end with creation of a strategic plan; the plan's objectives and strategies must be monitored for effectiveness. Phases of creative strategy-making and plan formulation should be alternated with periods of assessment. The process is not a direct course, but dynamic progression…
NASA/DOE/DOD nuclear propulsion technology planning: Summary of FY 1991 interagency panel results
NASA Technical Reports Server (NTRS)
Clark, John S.; Wickenheiser, Timothy J.; Doherty, Michael P.; Marshall, Albert; Bhattacharryya, Samit K.; Warren, John
1992-01-01
Interagency (NASA/DOE/DOD) technical panels worked in 1991 to evaluate critical nuclear propulsion issues, compare nuclear propulsion concepts for a manned Mars mission on a consistent basis, and to continue planning a technology development project for the Space Exploration Initiative (SEI). Panels were formed to address mission analysis, nuclear facilities, safety policy, nuclear fuels and materials, nuclear electric propulsion technology, and nuclear thermal propulsion technology. A summary of the results and recommendations of the panels is presented.
LONG-TERM STEWARDSHIP AT DOE HANFORD SITE - 12575
DOE Office of Scientific and Technical Information (OSTI.GOV)
MOREN RJ; GRINDSTAFF KD
2012-01-11
The U.S. Department of Energy's (DOE) Hanford Site is located in southeast Washington and consists of 1,518 square kilometers (586 square miles) of land. Established in 1943 as part of the Manhattan Project, Hanford workers produced plutonium for our nation's nuclear defense program until the mid 1980's. Since then, the site has been in cleanup mode that is being accomplished in phases. As we achieve remedial objectives and complete active cleanup, DOE will manage Hanford land under the Long-Term Stewardship (LTS) Program until completion of cleanup and the site becomes ready for transfer to the post cleanup landlord - currentlymore » planned for DOE's Office of Legacy Management (LM). We define Hanford's LTS Program in the ''Hanford Long-Term Stewardship Program Plan,'' (DOE/RL-201 0-35)[1], which describes the scope including the relationship between the cleanup projects and the LTS Program. DOE designed the LTS Program to manage and provide surveillance and maintenance (S&M) of institutional controls and associated monitoring of closed waste sites to ensure the protection of human health and the environment. DOE's Richland Operations Office (DOE-RL) and Hanford cleanup and operations contractors collaboratively developed this program over several years. The program's scope also includes 15 key activities that are identified in the DOE Program Plan (DOE/RL-2010-35). The LTS Program will transition 14 land segments through 2016. The combined land mass is approximately 570 square kilometers (220 square miles), with over 1,300 active and inactive waste sites and 3,363 wells. Land segments vary from buffer zone property with no known contamination to cocooned reactor buildings, demolished support facilities, and remediated cribs and trenches. DOE-RL will transition land management responsibilities from cleanup contractors to the Mission Support Contract (MSC), who will then administer the LTS Program for DOE-RL. This process requires an environment of cooperation between the contractors and DOE-RL. Information Management (IM) is a key part of the LTS program. The IM Program identifies, locates, stores, protects and makes accessible Hanford LTS records and data to support the transfer of property ultimately to LM. As such, DOE-RL manages the Hanford LTS Program in a manner consistent with LM's goals, policies, and procedures.« less
The attitude-behavior discrepancy in medical decision making.
He, Fei; Li, Dongdong; Cao, Rong; Zeng, Juli; Guan, Hao
2014-12-01
In medical practice, the dissatisfaction of patients about medical decisions made by doctors is often regarded as the fuse of doctor-patient conflict. However, a few studies have looked at why there are such dissatisfactions. This experimental study aimed to explore the discrepancy between attitude and behavior within medical situations and its interaction with framing description. A total of 450 clinical undergraduates were randomly assigned to six groups and investigated using the classic medical decision making problem, which was described either in a positive or a negative frame (2) × decision making behavior\\attitude to risky plan\\attitude to conservative plan (3). A discrepancy between attitude and behavior did exist in medical situations. Regarding medical dilemmas, if the mortality rate was described, subjects had a significant tendency to choose a conservative plan (t = 3.55, P < 0.01) yet if the survival rate was described, there was no such preference (t = -1.48, P > 0.05). However, regardless of the plan chosen by the doctor, the subjects had a significant opposing attitude (P < .05). Framing description had a significant impact on both decision making behavior and attitude (t behavior = -3.24, P < 0.01;t attitude to surgery = 4.08,P < 0.01;t attitude to radiation = -2.15,P < 0.05). A discrepancy of attitude-behavior does exist in medical situations. The framing of a description has an impact on medical decision-making.
30 CFR 250.130 - Why does MMS conduct inspections?
Code of Federal Regulations, 2011 CFR
2011-07-01
... approved Exploration Plan or Development and Production Plans; or right-of-use and easement, and other... blowouts, fires, spillages, or other major accidents has been installed and is operating properly according...
Code of Federal Regulations, 2010 CFR
2010-10-01
... an application that references that plan year cycle. Claims for an early retiree for a plan year... provider in the normal course of business does not produce a claim, such as a staff-model health...
A Framework for Assessing the Commercialization of Photovoltaic Power Generation
NASA Astrophysics Data System (ADS)
Yaqub, Mahdi
An effective framework does not currently exist with which to assess the viability of commercializing photovoltaic (PV) power generation in the US energy market. Adopting a new technology, such as utility-scale PV power generation, requires a commercialization assessment framework. The framework developed here assesses the economic viability of a set of alternatives of identified factors. Economic viability focuses on simulating the levelized cost of electricity (LCOE) as a key performance measure to realize `grid parity', or the equivalence between the PV electricity prices and grid electricity prices for established energy technologies. Simulation results confirm that `grid parity' could be achieved without the current federal 30% investment tax credit (ITC) via a combination of three strategies: 1) using economies of scale to reduce the LCOE by 30% from its current value of 3.6 cents/kWh to 2.5 cents/kWh, 2) employing a longer power purchase agreement (PPA) over 30 years at a 4% interest rate, and 3) improving by 15% the "capacity factor", which is the ratio of the total annual generated energy to the full potential annual generation when the utility is continuously operating at its rated output. The lower than commercial-market interest rate of 4% that is needed to realize `grid parity' is intended to replace the current federal 30% ITC subsidy, which does not have a cash inflow to offset the outflow of subsidy payments. The 4% interest rate can be realized through two proposed finance plans: The first plan involves the implementation of carbon fees on polluting power plants to produce the capital needed to lower the utility PPA loan term interest rate from its current 7% to the necessary 4% rate. The second plan entails a proposed public debt finance plan. Under this plan, the US Government leverages its guarantee power to issue bonds and uses the proceeds to finance the construction and operation of PV power plants with PPA loan with a 4% interest rate for a 30-year term instead of the current 15-year average term. Such government-financed PV utilities will sell electricity to the US Government at a lower than retail electricity price as compensation for a favorable interest rate (4% instead of 7%) and a longer PPA term (30 years instead of 15). The life-cycle cash flow simulation of this proposed financial plan ascertains a 20% reduction in PV LCOE. Such cost reduction could be applied as credit to the US government electricity bills with 20% saving. The government could also realize a second compensation from the replaced 30% ITC subsidy because such expenditures would no longer be needed. A comparison between the engineering economy cash flow simulation results of the current utility power PPA practice and the proposed financial plan suggests that the proposed plan would be viable. The simulation results also show that the proposed public debt financial plan does not reach grid parity on its own; rather, it needs to be an integral part of the PV commercialization framework developed in this dissertation. The outcome of this research demonstrates that the effective implementation of the developed framework could facilitate the realization of a commercially successful PV power generation industry.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Laney, T.
The configuration management architecture presented in this Configuration Management Plan is based on the functional model established by DOE-STD-1073-93, ``Guide for Operational Configuration Management Program.`` The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management.`` The CM model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOEmore » Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phases of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life cycle of the Waste Tank Farms and 242-A Evaporator of Tank Waste Remediation System.« less
What If It Rains on Your Eclipse? Planning Ahead for August 2017
NASA Astrophysics Data System (ADS)
Bartlett, Jennifer L.; Keohane, J.
2010-01-01
It was a dark and rainy morning, not far out of Shanghai, when we saw the 2009 July 22 total solar eclipse. Many of the Americans puttering around their equipment that morning, in hopes that the sky would clear enough to catch some of event they had traveled around the world to view, were already planning ahead for 2017 August 21, when a narrow strip of the United States will experience up to 2 minutes and 45 seconds of totality. For most people, a total solar eclipse is once in a lifetime event steeped in legend. If you are situated along this privileged corridor, you will have a wonderful opportunity for public outreach. But what if it rains? Historically, August is mostly sunny at the location of greatest eclipse, near Makanda, Illinois. Even with such favorable circumstances, having a rain plan will ensure you make the most of the occasion. First, the flexibility to relocate your program to take advantage of the most favorable weather would be ideal. If that is not a realistic option, include some protective gear with your equipment so that you can set up despite misty or drizzling conditions. Second, monitoring changing light levels and temperatures should be possible even under cloudy skies. Third, for some sites, changes in wildlife behavior may also be noticeable. If the weather is clear, such projects could enhance your program during the partial phases of the eclipse and provide enrichment materials for those unable to attend. While 2017 may still seem in the distant future to all but eclipse fanatics, some creativity and advance brainstorming will ensure that your outreach program shines during the event, even if the Sun does not cooperate. S. Bell (2009, pc.), HMNAO, provided the eclipse predictions. Additional information is available via USNO Eclipse Portal (http://www.eclipse.org.uk/eclbin/query_usno.cgi).
Throughput times for adults and children during two drive-through influenza vaccination clinics.
Banks, Laura L; Crandall, Cameron; Esquibel, Luke
2013-04-01
Successful planning for public health emergencies requires knowledge of effective methods for mass distribution of medication and supplies to the public. We measured the time required for the key components of 2 drive-through vaccination clinics and summarized the results as they applied to providing medical countermeasures to large populations of children and adults. We hypothesized that vaccinating children in addition to adults would affect throughput time. Using 2 separate drive-through vaccination clinics, we measured elapsed time for vehicle flow and vaccination procedures. We calculated the median length of stay and the time to administer vaccinations based on the number of individual vaccinations given per vehicle, and compared the vehicles in which children (aged 9-18 years) were vaccinated to those in which only adults were vaccinated. A total of 2174 vaccinations and 1275 vehicles were timed during the 2 clinics. The number of vaccinations and vehicles per hour varied during the course of the day; the maximums were 200 and 361 per hour, respectively. The median throughput time was 5 minutes, and the median vaccination time was 48 seconds. Flow over time varied by the hour, and the optimum number of vaccinations per vehicle to maximize efficiency was between 3 and 4. Our findings showed that the presence of children raised the total number of vaccinations given per vehicle and, therefore, the total vaccination processing time per vehicle. However, the median individual procedure time in the vehicles with children was not significantly increased, indicating no need to calculate increased times for processing children 9 years of age or older during emergency planning. Drive-through clinics can provide a large number of seasonal influenza vaccinations in a relatively efficient manner; provide needed experience for students and practitioners in techniques for mass administration of medical countermeasures; and assist public health and emergency management personnel with disaster planning. Including children older than 9 years does not reduce efficiency. (Disaster Med Public Health Preparedness. 2013;0:1-7).
Zilberberg, Marya D; Shorr, Andrew F
2008-01-01
Background Adult patients on prolonged acute mechanical ventilation (PAMV) comprise 1/3 of all adult MV patients, consume 2/3 of hospital resources allocated to MV population, and are nearly twice as likely to require a discharge to a skilled nursing facility (SNF). Their numbers are projected to double by year 2020. To aid in planning for this growth, we projected their annualized days and costs of hospital use and SNF discharges in year 2020 in the US. Methods We constructed a model estimating the relevant components of hospital utilization. We computed the total days and costs for each component; we also applied the risk for SNF discharge to the total 2020 PAMV population. The underlying assumption was that process of care does not change over the time horizon. We performed Monte Carlo simulations to establish 95% confidence intervals (CI) for the point estimates. Results Given 2020 projected PAMV volume of 605,898 cases, they will require 3.6 (95% CI 2.7–4.8) million MV, 5.5 (95% CI 4.3–7.0) million ICU and 10.3 (95% CI 8.1–13.0) million hospital days, representing an absolute increase of 2.1 million MV, 3.2 million ICU and 6.5 million hospital days over year 2000, at a total inflation-adjusted cost of over $64 billion. Expected discharges to SNF are 218,123 (95% CI 177,268–266,739), compared to 90,928 in 2000. Conclusion Our model suggest that the projected growth in the US in PAMV population by 2020 will result in annualized increases of more than 2, 3, and 6 million MV, ICU and hospital days, respectively, over year 2000. Such growth requires careful planning efforts and attention to efficiency of healthcare delivery. PMID:19032766
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
This Final ''Hanford Comprehensive Land-Use Plan Environmental Impact Statement'' (HCP EIS) is being used by the Department of Energy (DOE) and its nine cooperating and consulting agencies to develop a comprehensive land-use plan (CLUP) for the Hanford Site. The DOE will use the Final HCP EIS as a basis for a Record of Decision (ROD) on a CLUP for the Hanford Site. While development of the CLUP will be complete with release of the HCP EIS ROD, full implementation of the CLUP is expected to take at least 50 years. Implementation of the CLUP would begin a more detailed planningmore » process for land-use and facility-use decisions at the Hanford Site. The DOE would use the CLUP to screen proposals. Eventually, management of Hanford Site areas would move toward the CLUP land-use goals. This CLUP process could take more than 50 years to fully achieve the land-use goals.« less
Long-term surveillance plan for the Green River, Utah, disposal site
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-06-01
The long-term surveillance plan (LTSP) for the Green River, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Green River disposal cell. The U.S. Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This final LTSP was prepared as a requirement for acceptance under the U.S. Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). This LTSP documents whether the land and interests are owned by the United States or an Indian tribe and detailsmore » how the long-term care of the disposal site will be carried out. The Green River, Utah, LTSP is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a).« less
10 CFR 600.125 - Revision of budget and program plans.
Code of Federal Regulations, 2010 CFR
2010-01-01
... awards, recipients shall request prior approvals from the DOE for one or more of the following program or... may include authorizing recipients to do any one or more of the following. (1) Incur pre-award costs... approval of DOE. All pre-award costs are incurred at the recipient's risk (i.e., DOE is under no obligation...
10 CFR 600.125 - Revision of budget and program plans.
Code of Federal Regulations, 2012 CFR
2012-01-01
... awards, recipients shall request prior approvals from the DOE for one or more of the following program or... may include authorizing recipients to do any one or more of the following. (1) Incur pre-award costs... approval of DOE. All pre-award costs are incurred at the recipient's risk (i.e., DOE is under no obligation...
10 CFR 600.125 - Revision of budget and program plans.
Code of Federal Regulations, 2013 CFR
2013-01-01
... awards, recipients shall request prior approvals from the DOE for one or more of the following program or... may include authorizing recipients to do any one or more of the following. (1) Incur pre-award costs... approval of DOE. All pre-award costs are incurred at the recipient's risk (i.e., DOE is under no obligation...
10 CFR 600.125 - Revision of budget and program plans.
Code of Federal Regulations, 2011 CFR
2011-01-01
... awards, recipients shall request prior approvals from the DOE for one or more of the following program or... may include authorizing recipients to do any one or more of the following. (1) Incur pre-award costs... approval of DOE. All pre-award costs are incurred at the recipient's risk (i.e., DOE is under no obligation...
10 CFR 600.125 - Revision of budget and program plans.
Code of Federal Regulations, 2014 CFR
2014-01-01
... awards, recipients shall request prior approvals from the DOE for one or more of the following program or... may include authorizing recipients to do any one or more of the following. (1) Incur pre-award costs... approval of DOE. All pre-award costs are incurred at the recipient's risk (i.e., DOE is under no obligation...
40 CFR 51.15 - What data does my state need to report to EPA?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 2 2011-07-01 2011-07-01 false What data does my state need to report... PROGRAMS REQUIREMENTS FOR PREPARATION, ADOPTION, AND SUBMITTAL OF IMPLEMENTATION PLANS Air Emissions Reporting Requirements Specific Reporting Requirements § 51.15 What data does my state need to report to EPA...
30 CFR 250.130 - Why does BSEE conduct inspections?
Code of Federal Regulations, 2014 CFR
2014-07-01
... Exploration Plan or Development and Production Plans; or right-of-use and easement, and other applicable laws..., fires, spillages, or other major accidents has been installed and is operating properly according to the...
30 CFR 250.130 - Why does BSEE conduct inspections?
Code of Federal Regulations, 2012 CFR
2012-07-01
... Exploration Plan or Development and Production Plans; or right-of-use and easement, and other applicable laws..., fires, spillages, or other major accidents has been installed and is operating properly according to the...
30 CFR 250.130 - Why does BSEE conduct inspections?
Code of Federal Regulations, 2013 CFR
2013-07-01
... Exploration Plan or Development and Production Plans; or right-of-use and easement, and other applicable laws..., fires, spillages, or other major accidents has been installed and is operating properly according to the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... activities described in § 413.3(a)(2) will be of high quality and effective. (b) Plan of operation. (35 points) The Secretary reviews each application to determine the quality of the plan of operation for the... detailed plans for year one of the National Center, including— (i) Methodology and plan of operation; (ii...
Code of Federal Regulations, 2013 CFR
2013-07-01
... activities described in § 413.3(a)(2) will be of high quality and effective. (b) Plan of operation. (35 points) The Secretary reviews each application to determine the quality of the plan of operation for the... detailed plans for year one of the National Center, including— (i) Methodology and plan of operation; (ii...
Code of Federal Regulations, 2014 CFR
2014-07-01
... activities described in § 413.3(a)(2) will be of high quality and effective. (b) Plan of operation. (35 points) The Secretary reviews each application to determine the quality of the plan of operation for the... detailed plans for year one of the National Center, including— (i) Methodology and plan of operation; (ii...
Code of Federal Regulations, 2012 CFR
2012-07-01
... activities described in § 413.3(a)(2) will be of high quality and effective. (b) Plan of operation. (35 points) The Secretary reviews each application to determine the quality of the plan of operation for the... detailed plans for year one of the National Center, including— (i) Methodology and plan of operation; (ii...
Contracts and Management Services FY 1996 Site Support Program Plan: WBS 6.10.14. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Knoll, J.M. Jr.
1995-09-01
This is the Contracts and Management Services site support program plan for the US DOE Hanford site. The topics addressed in the program plan include a mission statement, program objectives, planning assumptions, program constraints, work breakdown structure, milestone list, milestone description sheets, and activity detail including cost accounting narrative summary, approved funding budget, and activity detailed description.
The Columbia River Protection Supplemental Technologies Quality Assurance Project Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
The U.S. Department of Energy (DOE) has conducted interim groundwater remedial activities on the Hanford Site since the mid-1990s for several groundwater contamination plumes. DOE established the Columbia River Protection Supplemental Technologies Project (Technologies Project) in 2006 to evaluate alternative treatment technologies. The objectives for the technology project are as follows: develop a 300 Area polyphosphate treatability test to immobilize uranium, design and test infiltration of a phosphate/apatite technology for Sr-90 at 100-N, perform carbon tetrachloride and chloroform attenuation parameter studies, perform vadose zone chromium characterization and geochemistry studies, perform in situ biostimulation of chromium studies for a reducing barriermore » at 100-D, and perform a treatability test for phytoremediation for Sr-90 at 100-N. This document provides the quality assurance guidelines that will be followed by the Technologies Project. This Quality Assurance Project Plan is based on the quality assurance requirements of DOE Order 414.1C, Quality Assurance, and 10 CFR 830, Subpart A--Quality Assurance Requirements as delineated in Pacific Northwest National Laboratory’s Standards-Based Management System. In addition, the technology project is subject to the Environmental Protection Agency (EPA) Requirements for Quality Assurance Project Plans (EPA/240/B-01/003, QA/R-5). The Hanford Analytical Services Quality Assurance Requirements Documents (HASQARD, DOE/RL-96-68) apply to portions of this project and to the subcontractors. HASQARD requirements are discussed within applicable sections of this plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-08-01
On May 15, 1996, the Department of Energy (DOE) announced its decision to extend and renegotiate its contracts with the University of California for the management and operation of the Los Alamos, Lawrence Berkeley, and Lawrence Livermore National Laboratories. Current contracts for the operation of these laboratories expire in 1997. The renegotiation process provides an opportunity for the Department to: (1) recover at least $620 million in excess assets from the pension plans it has funded for University of California employees who work at DOE`s laboratories; and (2) improve the Department`s ability to exercise prudent management of its interest inmore » those pension funds. According to Department records, as of July 1, 1995, the University of California Retirement Plan had between $620 million and $2.0 billion in excess assets that were attributable to the Department of Energy (emphasis supplied). The wide variation in excess assets is a function of the assumptions used in making these calculations. These are described in Appendix 1 to this report. It was concluded as a result of the audit that, as part of the contract renegotiation process, the Department should obtain the cooperation and assistance of the University of California in recovering excess pension plan assets in a manner that does not affect the defined retirement benefits of the contract employees. This could include jointly sponsoring legislation to modify any existing legal restrictions.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Weisbin, C.R.; Barhen, J.; Hamel, W.R.
1987-01-01
A general framework is provided for more detailed planning on an annual basis, both for DOE and for other sponsoring organizations. The charter for the overall intelligent machine research effort is presented along with programmatic and technological goals. A research implementation plan is provided through the FY 1989 horizon.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-25
... in 2014, all non-grandfathered health insurance coverage in the individual and small group markets... PHS Act directs non-grandfathered group health plans to ensure that cost- sharing under the plan does... individual and small group markets, and not to Medicaid benchmark or benchmark-equivalent plans. In a...
Resiliency Planning for the Quinault Indian Nation | Integrated Energy
into its community planning. Landscape photo of a shoreline After two seawall breaches and associated disaster declarations, the Quinault Indian Nation partnered with NREL and DOE to incorporate resilience Indian Nation to define how a resilient community might look and develop a strategic energy plan. After
Planning Brings Vision Into Focus (Brochure)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2013-04-01
This case study/fact sheet highlights the strategic energy planning process for Tribes that was developed by the DOE Office of Indian Energy. This nine-step process, which is outlined in one of the foundational education courses offered by the Office, enables Tribes to pursue energy projects in a well-planned and strategic manner.
40 CFR 35.6010 - Indian Tribe and intertribal consortium eligibility.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Hazardous Substances Pollution Contingency Plan (the National Contingency Plan or NCP), except that Indian... jurisdiction is not needed for the Tribe to carry out the support agency activities of the work plan. (b... substantially the same as a State, the subpart O definition of “State” does not include Indian Tribes because...
Generic Fortran Containers (GFC)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Liakh, Dmitry
2016-09-01
The Fortran language does not provide a standard library that implements generic containers, like linked lists, trees, dictionaries, etc. The GFC software provides an implementation of generic Fortran containers natively written in Fortran 2003/2008 language. The following containers are either already implemented or planned: Stack (done), Linked list (done), Tree (done), Dictionary (done), Queue (planned), Priority queue (planned).
How Does a Multi-Site Institution Plan Effectively?
ERIC Educational Resources Information Center
Jefferson, Curtis F.
A multi-site college plans effectively by having in place planning and evaluation systems that enhance its capability to respond effectively to changes in the environment in order to continue to provide high quality educational programs and services for the people in its service area. The effectiveness of these systems is dependent on clearly…
26 CFR 1.411(a)-7 - Definitions and special rules.
Code of Federal Regulations, 2010 CFR
2010-04-01
... this section), life insurance benefits payable as a lump sum, incidental death benefits, current life... annuity does not exceed the annual benefit of a single life annuity. (2) Defined contribution plan. In the case of a defined contribution plan, the balance of the employee's account held under the plan. (b...
The Effects of Scenario Planning on Participant Perceptions of Learning Organization Characteristics
ERIC Educational Resources Information Center
Haeffner, Melissa; Leone, Deanna; Coons, Laura; Chermack, Thomas
2012-01-01
Scenario planning is often used by organizations to think about future uncertainties. However, what it does in terms of changing perceptions is difficult to assess and quantify. To address this need, this article builds on previous studies documenting the effectiveness of scenario planning. Specifically, this article contributes to the data on…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anita Gianotto; Dena Tomchak
As required by DOE Order 413.2B the FY 2014 Program Plan is written to communicate ares of investment and approximate amounts being requested for the upcoming fiscal year. The program plan also includes brief highlights of current or previous LDRD projects that have an opportunity to impact our Nation's current and future energy challenges.
Environmental Implementation Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
The Environmental Implementation Plan (EIP) is a dynamic long-range environmental-protection plan for SRS. The EIP communicates the current and future (five year) environmental plans from individual organizations and divisions as well as site environmental initiatives which are designed to protect the environment and meet or exceed compliance with changing environmental/ regulatory requirements. Communication with all site organizations is essential for making the site environmental planning process work. Demonstrating environmental excellence is a high priority embodied in DOE and WSRC policy. Because of your support and participation in the three EIP initiatives; Reflections, Sectional Revision, and Integrated Planning, improvements are beingmore » made to the EIP and SRS environmental protection programs. I appreciate the ``Partnership in Environmental Excellence`` formed by the environmental coordinators and professionals who work daily toward our goal of compliance and environmental excellence. I look forward to seeing continued success and improvement in our environmental protection programs through combined efforts of all site organizations to protect our employees, the public health, and the environment. Together, we will achieve our site vision for SRS to be the recognized model for Environmental Excellence in the DOE Nuclear Weapons Complex.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Campbell, Sam; Dam, Wiliam
In 2012, the U.S.Department of Energy (DOE) began reassessing the former Riverton, Wyoming, Processing Site area for potential contaminant sources impacting groundwater. A flood in 2010 along the Little Wind River resulted in increases in groundwater contamination (DOE 2013).This investigation is a small part of continued efforts by DOE and other stakeholders to update human health and ecological risk assessments, to make a comprehensive examination of all exposure pathways to ensure that the site remains protective through established institutional controls. During field inspections at the Riverton Site in 2013, a white evaporitic mineral deposit was identified along the bank ofmore » the Little Wind River within the discharge zone of the groundwater contamination plume. In December 2013, Savannah River National Laboratory (SRNL) personnel collected a sample for analysis by X-ray fluorescence (Figure 1 shows the type of material sampled). The sample had a uranium concentration of approximately 64 to 73 parts per million. Although the uranium in this mineral deposit is within the expected range for evaporatic minerals in the western United States (SRNL 2014), DOE determined that additional assessment of the mineral deposit was warranted. In response to the initial collection and analysis of a sample of the mineral deposit, DOE developed a work plan (Work Plan to Sample Mineral Deposits Along the Little Wind River, Riverton, Wyoming, Processing Site [DOE 2014]) to further define the extent of these mineral deposits and the concentration of the associated contaminants (Appendix A). The work plan addressed field reconnaissance, mapping, sampling, and the assessment of risk associated with the mineral deposits adjacent to the Little Wind River.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Teng, C; Yin, L; Ainsley, C
2015-06-15
Purpose: To characterize the changes in Hounsfield unit (HU) in lung radiotherapy with proton beams during the course of treatment and to study the effect on the proton plan dose distribution. Methods: Twenty consecutive patients with non-small cell lung cancer treated with proton radiotherapy who underwent multiple CT scans including the planning CT and weekly verification CTs were studied. HU histograms were computed for irradiated lung volumes in beam paths for all scans using the same treatment plan. Histograms for un-irradiated lung volume were used as control to characterize inter-scan variations. HU statistics were calculated for both irradiated and un-irradiatedmore » lung volumes for each patient scan. Further, multiple CT scans based on the same planning CT were generated by replacing the HU of the lung based on the verification CT scans HU values. Using the same beam arrangement, we created plans for each of the altered CT scans to study the dosimetric effect using the dose volume histogram. Results: Lung HU decreased for irradiated lung volume during the course of radiotherapy. The magnitude of this change increased with total irradiation dose. On average, HU changed by −53.8 in the irradiated volume. This change resulted in less than 0.5mm of beam overshoot in tissue for every 1cm beam traversed in the irradiated lung. The dose modification is about +3% for the lung, and less than +1% for the primary tumor. Conclusion: HU of the lung decrease throughout the course of radiation therapy. This change results in a beam overshoot (e.g. 3mm for 6cm of lung traversed) and causes a small dose modification in the overall plan. However, this overshoot does not affect the quality of plans since the margins used in planning, based on proton range uncertainty, are greater. HU needs to change by 150 units before re-planning is warranted.« less
42 CFR 435.219 - Individuals receiving State plan home and community-based services.
Code of Federal Regulations, 2014 CFR
2014-10-01
... that does not exceed 150 percent of the Federal poverty line (FPL); (3) Meet the needs-based criteria...) Have income that does not exceed 300 percent of the Supplemental Security Income Federal Benefit Rate...
Advanced Energy Systems Design | State, Local, and Tribal Governments |
challenges differently. For example: how much does one city's planning scenario versus another change the investment need? At the same time, how does the economic impact on the local community change? What kind of
Code of Federal Regulations, 2010 CFR
2010-04-01
... INDIAN SELF-DETERMINATION AND EDUCATION ASSISTANCE ACT Construction § 900.120 How does an Indian tribe or..., engineering reports, design reports, plans of requirements, cost estimates, environmental assessments, or...
U 1608-52: a Cornerstone in Our Understanding of the Khz Qpos
NASA Astrophysics Data System (ADS)
Mendez, Mariano
We propose a series of ASM-triggered TOO observations of the atoll source 4U 1608-52 in outburst for a total of 450 ksec. These triggers are planned to maximize the probability of observing kHz QPOs and type- I X-ray bursts in this source. This is one of only 2 sources where the separation between the 2 simultaneous kHz QPOs varies significantly as a function of mass accretion rate. The detection of near-coherent oscillations during the bursts will provide a strong clue to the nature of the kHz QPOs in LMXBs, as it would make clear at which mass accretion level, if any, the kHz peak separation does approach the inferred spin rate.
Institutional plan. Fiscal year, 1997--2002
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-10-01
The Institutional Plan is the culmination of Argonne`s annual planning cycle. The document outlines what Argonne National Laboratory (ANL) regards as the optimal development of programs and resources in the context of national research and development needs, the missions of the Department of Energy and Argonne National Laboratory, and pertinent resource constraints. It is the product of ANL`s internal planning process and extensive discussions with DOE managers. Strategic planning is important for all of Argonne`s programs, and coordination of planning for the entire institution is crucial. This Institutional Plan will increasingly reflect the planning initiatives that have recently been implemented.
5 CFR 892.102 - What is premium conversion and how does it work?
Code of Federal Regulations, 2010 CFR
2010-01-01
...) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL FLEXIBLE BENEFITS PLAN: PRE-TAX PAYMENT OF HEALTH BENEFITS... FEHB insurance premium. If you are a participant in the premium conversion plan, Section 125 of the...
Highlights of NASA/DOE photovoltaic market assessment visit to Morocco
NASA Technical Reports Server (NTRS)
1981-01-01
A broad range of agricultural, rural development, and other power applications in various regions of Morocco were examined to determine the potential market for photovoltaic products in Moroccan development. The primary focus of the study was the agriculture sector which accounts for approximately 17% of the country's GNP. The country has a clear need for reliable remote power systems, but does not have the financial resources to invest in the relatively high capital cost PV equipment. A modest potential for PV use was identified in nonagricultural rural services, such as refrigerators for rural clinics and rural radio-telephones. The main potential for PV in Morocco in the next five years lies mainly in the telecommunications sector. Applications include rural TV sets, TV repeater stations, microwave relay stations, and railroad, marine, and airline signalling. Market size estimates were derived from development and expansion plans. At an average customer cost for complete installed systems from $18/Wp to $30/Wp the total potential market value is estimated in the range of $6.6 to $11 million over the 1981-1986 period.
Nuisance Wildlife Education and Prevention Plan for the Oak Ridge National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Giffen, Neil R
This document outlines a plan for management of nuisance wildlife at the Oak Ridge National Laboratory (ORNL). Nuisance wildlife management includes wildlife population control through hunting, trapping, removal, and habitat manipulation; wildlife damage control; and law enforcement. This plan covers the following subjects: (1) roles and responsibilities of individuals, groups, and agencies; (2) the general protocol for reducing nuisance wildlife problems; and (3) species-specific methodologies for resolving nuisance wildlife management issues for mammals, birds, snakes, and insects. Achievement of the objectives of this plan will be a joint effort between the Tennessee Wildlife Resources Agency (TWRA); U. S. Department ofmore » Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS)-Wildlife Services (WS); and ORNL through agreements between TWRA and the U.S. Department of Energy (DOE); DOE and UT-Battelle, LLC; and UT-Battelle, LLC; and USDA, APHIS-WS.« less
Reading your own lips: common-coding theory and visual speech perception.
Tye-Murray, Nancy; Spehar, Brent P; Myerson, Joel; Hale, Sandra; Sommers, Mitchell S
2013-02-01
Common-coding theory posits that (1) perceiving an action activates the same representations of motor plans that are activated by actually performing that action, and (2) because of individual differences in the ways that actions are performed, observing recordings of one's own previous behavior activates motor plans to an even greater degree than does observing someone else's behavior. We hypothesized that if observing oneself activates motor plans to a greater degree than does observing others, and if these activated plans contribute to perception, then people should be able to lipread silent video clips of their own previous utterances more accurately than they can lipread video clips of other talkers. As predicted, two groups of participants were able to lipread video clips of themselves, recorded more than two weeks earlier, significantly more accurately than video clips of others. These results suggest that visual input activates speech motor activity that links to word representations in the mental lexicon.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Spencer, Charles G
2012-12-01
The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy effi ciency and sustainability and to achievement of the Guiding Principles. Specifi cally, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan, while promoting overall sustainability and reduction of greenhouse gas emissions. The mission of the Y-12 Energy Management program is to incorporate energy-effi cient technologies site-wide and to position Y-12 tomore » meet NNSA energy requirement needs through 2025 and beyond. The plan addresses greenhouse gases, buildings, fleet management, water use, pollution prevention, waste reduction, sustainable acquisition, electronic stewardship and data centers, site innovation and government-wide support.« less
NASA Technical Reports Server (NTRS)
1994-01-01
The NASA Strategic Plan is a living document. It provides far-reaching goals and objectives to create stability for NASA's efforts. The Plan presents NASA's top-level strategy: it articulates what NASA does and for whom; it differentiates between ends and means; it states where NASA is going and what NASA intends to do to get there. This Plan is not a budget document, nor does it present priorities for current or future programs. Rather, it establishes a framework for shaping NASA's activities and developing a balanced set of priorities across the Agency. Such priorities will then be reflected in the NASA budget. The document includes vision, mission, and goals; external environment; conceptual framework; strategic enterprises (Mission to Planet Earth, aeronautics, human exploration and development of space, scientific research, space technology, and synergy); strategic functions (transportation to space, space communications, human resources, and physical resources); values and operating principles; implementing strategy; and senior management team concurrence.
DESC (Defense Electronics Supply Center) Total Quality Management Plan
1989-04-01
Paoerwort Reduction Proodt(0704.01 ge. Washington. DC 20S03 4. TITLE AND SUBTITLE Api598 . FUNDING NUMBERS DESC Total Quality Management Master Plan...OF PAGES TQM (Total Quality Management ), Continuous Process Improvement,_________ cTainingManagement 16. PRICE CODE 17. SECURITY CLASSIFICATION 18... QUALITY MANAGEMENT As you read the DESC Total Quality Management Plan, I ask each of you to make a commitment to continuously strive for improvement
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-01-01
Through the National Governors' Association (NGA) project ''Critical Issues Related to Radioactive Waste and Materials Disposition Involving DOE Facilities'' NGA brings together Governors' policy advisors, state regulators, and DOE officials to examine critical issues related to the cleanup and operation of DOE nuclear weapons and research facilities. Topics explored through this project include: Decisions involving disposal of mixed, low-level, and transuranic (TRU) waste and disposition of nuclear materials. Decisions involving DOE budget requests and their effect on environmental cleanup and compliance at DOE facilities. Strategies to treat mixed, low-level, and transuranic (TRU) waste and their effect on individual sites inmore » the complex. Changes to the FFCA site treatment plans as a result of proposals in the EM 2006 cleanup plans and contractor integration analysis. Interstate waste and materials shipments. Reforms to existing RCRA and CERCLA regulations/guidance to address regulatory overlap and risks posed by DOE wastes. The overarching theme of this project is to help the Department improve coordination of its major program decisions with Governors' offices and state regulators and to ensure such decisions reflect input from these key state officials and stakeholders. This report summarizes activities conducted during the quarter from October 1, 1997 through December 31, 1997, under the NGA project. The work accomplished by the NGA project team during the past four months can be categorized as follows: maintained open communication with DOE on a variety of activities and issues within the DOE environmental management complex; and maintained communication with NGA Federal Facilities Compliance Task Force members regarding DOE efforts to formulate a configuration for mixed low-level waste and low-level treatment and disposal, DOE activities in the area of the Hazardous Waste Identification Rule, and DOE's proposed National Dialogue.« less
Fernald Preserve 2015 Site Environmental Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Voisard, Karen; Smiley, Sue
The Fernald Preserve 2015 Site Environmental Report provides stakeholders with the results from the Fernald, Ohio, Site’s environmental monitoring programs for 2015; a summary of the U.S. Department of Energy’s (DOE’s) activities conducted onsite; and a summary of the Fernald Preserve’s compliance with the various environmental regulations, compliance agreements, and DOE policies that govern site activities. This report has been prepared in accordance with the “Integrated Environmental Monitoring Plan,” which is Attachment D of the Comprehensive Legacy Management and Institutional Controls Plan (LMICP) (DOE 2016).
40 CFR 60.1575 - How does the model rule relate to the required elements of my State plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false How does the model rule relate to the... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES... Before August 30, 1999 Use of Model Rule § 60.1575 How does the model rule relate to the required...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Greg Shott, Vefa Yucel, Lloyd Desotell
2008-05-01
This Special Analysis (SA) was prepared to assess the potential impact of inadvertent disposal of a limited quantity of transuranic (TRU) waste in classified Trench 4 (T04C) within the Area 5 Radioactive Waste Management Site (RWMS) at the Nevada Test Site (NTS). The Area 5 RWMS is a low-level radioactive waste disposal site in northern Frenchman Flat on the Nevada Test Site (NTS). The Area 5 RWMS is regulated by the U.S. Department of Energy (DOE) under DOE Order 435.1 and DOE Manual (DOE M) 435.1-1. The primary objective of the SA is to evaluate if inadvertent disposal of limitedmore » quantities of TRU waste in a shallow land burial trench at the Area 5 RWMS is in compliance with the existing, approved Disposal Authorization Statement (DAS) issued under DOE M 435.1-1. In addition, supplemental analyses are performed to determine if there is reasonable assurance that the requirements of Title 40, Code of Federal Regulations (CFR), Part 191, Environmental Radiation Protection Standards for Management and Disposal of Spent Nuclear Fuel, High-Level, and Transuranic Radioactive Wastes, can be met. The 40 CFR 191 analyses provide supplemental information regarding the risk to human health and the environment of leaving the TRU waste in T04C. In 1989, waste management personnel reviewing classified materials records discovered that classified materials buried in trench T04C at the Area 5 RWMS contained TRU waste. Subsequent investigations determined that a total of 102 55-gallon drums of TRU waste from Rocky Flats were buried in trench T04C in 1986. The disposal was inadvertent because unclassified records accompanying the shipment indicated that the waste was low-level. The exact location of the TRU waste in T04C was not recorded and is currently unknown. Under DOE M 435.1-1, Chapter IV, Section P.5, low-level waste disposal facilities must obtain a DAS. The DAS specifies conditions that must be met to operate within the radioactive waste management basis, consisting of a performance assessment (PA), composite analysis (CA), closure plan, monitoring plan, waste acceptance criteria, and a PA/CA maintenance plan. The DOE issued a DAS for the Area 5 RWMS in 2000. The Area 5 RWMS DAS was, in part, based on review of a CA as required under DOE M 435.1-1, Chapter IV, Section P.(3). A CA is a radiological assessment required for DOE waste disposed before 26 September 1988 and includes the radiological dose from all sources of radioactive material interacting with all radioactive waste disposed at the Area 5 RWMS. The approved Area 5 RWMS CA, which includes the inventory of TRU waste in T04C, indicates that the Area 5 RWMS waste inventory and all interacting sources of radioactive material can meet the 0.3 mSv dose constraint. The composite analysis maximum annual dose for a future resident at the Area 5 RWMS was estimated to be 0.01 mSv at 1,000 years. Therefore, the inadvertent disposal of TRU in T04C is protective of the public and the environment, and compliant with all the applicable requirements in DOE M 435.1-1 and the DAS. The U.S. Environmental Protection Agency promulgated 40 CFR 191 to establish standards for the planned disposal of spent nuclear fuel, high level, and transuranic wastes in geologic repositories. Although not required, the National Nuclear Security Administration Nevada Site Office requested a supplemental analysis to evaluate the likelihood that the inadvertent disposal of TRU waste in T04C meets the requirements of 40 CFR 191. The SA evaluates the likelihood of meeting the 40 CFR 191 containment requirements (CRs), assurance requirements, individual protection requirements (IPRs), and groundwater protection standards. The results of the SA indicate that there is a reasonable expectation of meeting all the requirements of 40 CFR 191. The conclusion of the SA is that the Area 5 RWMS with the TRU waste buried in T04C is in compliance with all requirements in DOE M 435.1-1 and the DAS. Compliance with the DAS is demonstrated by the results of the Area 5 RWMS CA. Supplemental analyses in the SA indicate there is a reasonable expectation that the TRU in T04C can meet all the requirements of 40 CFR 191. Therefore, inadvertent disposal of a limited quantity of TRU in a shallow land burial trench at the Area 5 RWMS does not pose a significant risk to the public and the environment.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lester, M.; Liebow, E.; Holm, J.
1994-05-01
The Department of Energy (DOE) plans to honor its commitment to government-to-government interactions by providing advance notice of DOE spent fuel and high-level waste shipments to Indian tribes whose jurisdictions are crossed by or adjacent to transportation routes. The tribes are important contributors to a regional response network, and providing tribes with advance notice of DOE shipping plans marks the start -- not the end -- of direct, government-to-government interactions with DOE. The Tribal Prenotification Analysis Support System (PASS) is being developed for the Office of Special Programs within the Department`s Office of Environmental Restoration and Waste Management. PASS willmore » help DOE-Headquarters to coordinate field office activities and provide technical and institutional support to the DOE field offices. PASS is designed to be used by anyone with minimum computer literacy and having contemporary computer hardware and software. It uses on-screen maps to choose and display a shipment route, and to display the tribal jurisdictions. With forms that are easy to understand, it provides information about each jurisdiction and points of contact. PASS records all contacts, commitments made, and actions taken.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-12-01
The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE`s Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose.more » First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Marutzky, Sam; Farnham, Irene
The purpose of the Nevada National Security Site (NNSS) Integrated Sampling Plan (referred to herein as the Plan) is to provide a comprehensive, integrated approach for collecting and analyzing groundwater samples to meet the needs and objectives of the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) Underground Test Area (UGTA) Activity. Implementation of this Plan will provide high-quality data required by the UGTA Activity for ensuring public protection in an efficient and cost-effective manner. The Plan is designed to ensure compliance with the UGTA Quality Assurance Plan (QAP). The Plan’s scope comprises sample collectionmore » and analysis requirements relevant to assessing the extent of groundwater contamination from underground nuclear testing. This Plan identifies locations to be sampled by corrective action unit (CAU) and location type, sampling frequencies, sample collection methodologies, and the constituents to be analyzed. In addition, the Plan defines data collection criteria such as well-purging requirements, detection levels, and accuracy requirements; identifies reporting and data management requirements; and provides a process to ensure coordination between NNSS groundwater sampling programs for sampling of interest to UGTA. This Plan does not address compliance with requirements for wells that supply the NNSS public water system or wells involved in a permitted activity.« less
Benefits of physical exercise on the aging brain: the role of the prefrontal cortex.
Berchicci, Marika; Lucci, Giuliana; Di Russo, Francesco
2013-11-01
Motor planning in older adults likely relies on the overengagement of the prefrontal cortex (PFC) and is associated with slowness of movement and responses. Does a physically active lifestyle counteract the overrecruitment of the PFC during action preparation? This study used high-resolution electroencephalography to measure the effect of physical exercise on the executive functions of the PFC preceding a visuomotor discriminative task. A total of 130 participants aged 15-86 were divided into two groups based on physical exercise participation. The response times and accuracy and the premotor activity of the PFC were separately correlated with age for the two groups. The data were first fit with a linear function and then a higher order polynomial function. We observed that after 35-40 years of age, physically active individuals have faster response times than their less active peers and showed no signs of PFC hyperactivity during motor planning. The present findings show that physical exercise could speed up the response of older people and reveal that also in middle-aged people, moderate-to-high levels of physical exercise benefits the planning/execution of a response and the executive functions mediated by the PFC, counteracting the neural overactivity often observed in the elderly adults.
Ghasemian, Mohammad; Poursafa, Parinaz; Amin, Mohammad Mehdi; Ziarati, Mohammad; Ghoddousi, Hamid; Momeni, Seyyed Alireza; Rezaei, Amir Hossein
2012-01-01
Background. The purpose of this study is environmental impact assessment of the industrial estate development planning. Methods. This cross-sectional study was conducted in 2010 in Isfahan province, Iran. GIS and matrix methods were applied. Data analysis was done to identify the current situation of the region, zoning vulnerable areas, and scoping the region. Quantitative evaluation was done by using matrix of Wooten and Rau. Results. The net score for impact of industrial units operation on air quality of the project area was (−3). According to the transition of industrial estate pollutants, residential places located in the radius of 2500 meters of the city were expected to be affected more. The net score for impact of construction of industrial units on plant species of the project area was (−2). Environmental protected areas were not affected by the air and soil pollutants because of their distance from industrial estate. Conclusion. Positive effects of project activities outweigh the drawbacks and the sum scores allocated to the project activities on environmental factor was (+37). Totally it does not have detrimental effects on the environment and residential neighborhood. EIA should be considered as an anticipatory, participatory environmental management tool before determining a plan application. PMID:22272210
MO-G-BRE-02: A Survey of IMRT QA Practices for More Than 800 Institutions
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pulliam, K; Kerns, J; Howell, R
Purpose: A wide range of techniques and measurement devices are employed for IMRT QA, causing a large variation of accepted action limits and potential follow up for failing plans. Such procedures are not well established or accepted in the medical physics community. To achieve the goal of proving insight into current IMRT QA practices, we created an electronic IMRT QA survey. The survey was open to a variety of the most common QA devices and assessed the type of comparison to measurement, action limits, delivery methods, and clinical action for failing QA plans. Methods: We conducted an online survey throughmore » the Radiological Physics Center's (RPC) annual survey with the goal of ascertaining elements of routine patient-specific IMRT QA. A total of 874 institutions responded to the survey. The questions ranged from asking for action limits, dosimeter type(s) used, delivery techniques, and actions taken when a plan fails IMRT QA. Results: The most common (52%) planar gamma criteria was 3%/3 mm with a 95% of pixels passing criteria. The most common QA device were diode arrays (48%). The most common first response to a plan failing QA was to re-measure at the same point the point dose (89%), second was to re-measure at a new point (13%), and third was to analyze the plan in relative instead of absolute mode (10%) (Does not add to 100% as not all institutions placed a response for each QA follow-up option). Some institutions, however, claimed that they had never observed a plan failure. Conclusion: The survey provided insights into the way the community currently performs IMRT QA. This information will help in the push to standardize action limits among dosimeters.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ethan W. Brown
2001-09-01
Through the National Governors' Association (NGA) project ''Critical Issues Related to Radioactive Waste and Materials Disposition Involving DOE Facilities'' NGA brings together Governors' policy advisors, state regulators, and DOE officials to examine critical issues related to the cleanup and operation of DOE nuclear weapons and research facilities. Topics explored through this project include: Decisions involving disposal of mixed, low-level, and transuranic (TRU) waste and disposition of nuclear materials. Decisions involving DOE budget requests and their effect on environmental cleanup and compliance at DOE facilities. Strategies to treat mixed, low-level, and transuranic (TRU) waste and their effect on individual sites inmore » the complex. Changes to the FFCA site treatment plans as a result of proposals in the Department's Accelerating Cleanup: Paths to Closure plan and contractor integration analysis. Interstate waste and materials shipments. Reforms to existing RCRA and CERCLA regulations/guidance to address regulatory overlap and risks posed by DOE wastes. The overarching theme of this project is to help the Department improve coordination of its major program decisions with Governors' offices and state regulators and to ensure such decisions reflect input from these key state officials and stakeholders. This report summarizes activities conducted during the period from April 1, 2001 through June 30, 2001, under the NGA grant.« less
Square Peg for a Square Hole: A Standards- and Repertoire-Based Curriculum Model
ERIC Educational Resources Information Center
Standerfer, Stephanie L.; Hunter, Lisa R.
2010-01-01
For decades, music teachers have shared the dread of writing formal lesson plans, yet most know that planning yields better instruction. Why does this disconnect continue? The common argument that music teachers make is that teaching music is fundamentally different from teaching other subjects. Lesson plans are written to pacify supervisors and…
26 CFR 1.401-6 - Termination of a qualified plan.
Code of Federal Regulations, 2012 CFR
2012-04-01
... particular case. For example, a plan is terminated when, in connection with the winding up of the employer's... cost at any time (which includes the unfunded prior normal cost and unfunded interest on any unfunded cost) does not exceed the unfunded past service cost as of the date of establishment of the plan, plus...
26 CFR 1.401-6 - Termination of a qualified plan.
Code of Federal Regulations, 2011 CFR
2011-04-01
... particular case. For example, a plan is terminated when, in connection with the winding up of the employer's... cost at any time (which includes the unfunded prior normal cost and unfunded interest on any unfunded cost) does not exceed the unfunded past service cost as of the date of establishment of the plan, plus...
26 CFR 1.401-6 - Termination of a qualified plan.
Code of Federal Regulations, 2014 CFR
2014-04-01
... particular case. For example, a plan is terminated when, in connection with the winding up of the employer's... cost at any time (which includes the unfunded prior normal cost and unfunded interest on any unfunded cost) does not exceed the unfunded past service cost as of the date of establishment of the plan, plus...
26 CFR 1.401-6 - Termination of a qualified plan.
Code of Federal Regulations, 2013 CFR
2013-04-01
... particular case. For example, a plan is terminated when, in connection with the winding up of the employer's... cost at any time (which includes the unfunded prior normal cost and unfunded interest on any unfunded cost) does not exceed the unfunded past service cost as of the date of establishment of the plan, plus...
Geographers as Planners: What Skills Does the Job Require.
ERIC Educational Resources Information Center
Stephens, David T.
A survey of 524 planning agencies and consultants in the Midwest and Southwest was undertaken in 1976 to identify skills required for planning and to assess current capabilities in those skill areas. The major purpose of the survey was to aid geographic educators as they prepare students for careers in the planning profession. One part of the…
Code of Federal Regulations, 2010 CFR
2010-10-01
... approve planning or design documents prepared by the Self-Governance Tribe? 137.361 Section 137.361 Public... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in... opportunities to approve planning or design documents prepared by the Self-Governance Tribe? Yes, but only if...
42 CFR 59.5 - What requirements must be met by a family planning project?
Code of Federal Regulations, 2010 CFR
2010-10-01
...). If an organization offers only a single method of family planning, it may participate as part of a... status. (5) Not provide abortion as a method of family planning. A project must: (i) Offer pregnant women...) about which the pregnant woman indicates she does not wish to receive such information and counseling...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Werling, Eric
This report presents the Building America Research-to-Market Plan (Plan), including the integrated Building America Technology-to-Market Roadmaps (Roadmaps) that will guide Building America’s research, development, and deployment (RD&D) activities over the coming years. The Plan and Roadmaps will be updated as necessary to adapt to research findings and evolving stakeholder needs, and they will reflect input from DOE and stakeholders.
Site observational work plan for the UMTRA Project site at Monument Valley, Arizona
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agencymore » (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.« less
Code of Federal Regulations, 2010 CFR
2010-10-01
... SECURITY PREPAREDNESS REVIEW AND APPROVAL OF STATE AND LOCAL RADIOLOGICAL EMERGENCY PLANS AND PREPAREDNESS... licensee emergency preparedness except as these assessments and determinations affect the emergency... planning and preparedness with respect to emergencies at commercial nuclear power facilities and does not...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-27
... crewmembers or roadway workers. It does so while increasing railroad productivity and significantly improving... the document, if submitted on behalf of an association, business, labor union, etc.). See http://www...
Internship - practical education
DOE Office of Scientific and Technical Information (OSTI.GOV)
Porell, A.L.; Bauman, H.F.
1989-01-01
The current emphasis on regulatory compliance with environmental laws has depleted the availability of experienced environmental scientists and engineers needed to initiate critical environmental projects. Further, projects of short duration and long-term commitments to employment situations are considered a high risk for both the employer and the employee. Martin Marietta Energy Systems, Inc., has met this challenge for federal agencies through the US Department of Energy's (DOE's) Hazardous Waste Remedial Actions Program (HAZWRAP). Through unique interdepartmental agency agreements between the DOE and the Department of Defense (DOD) and contractual arrangements between Energy Systems, DOE, and the University of Tennessee's (UT's)more » Waste Management Institute (WMI), an intern program was formulated. HAZWRAP is a DOE headquarters' program for addressing hazardous-waste issues at all DOE facilities. Energy Systems is the support contractor office responsible for developing policies and implementing plans for this program. Under this charter, HAZWRAP assembled a large staff of experienced project managers for developing remedial actions plans, while providing other federal agencies assistance in implementing their remedial actions programs. HAZWRAP project managers are currently managing remedial investigations and feasibility studies at 130 federal facilities located throughout the DOD.« less
Plutonium inventories for stabilization and stabilized materials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, A.K.
1996-05-01
The objective of the breakout session was to identify characteristics of materials containing plutonium, the need to stabilize these materials for storage, and plans to accomplish the stabilization activities. All current stabilization activities are driven by the Defense Nuclear Facilities Safety Board Recommendation 94-1 (May 26, 1994) and by the recently completed Plutonium ES&H Vulnerability Assessment (DOE-EH-0415). The Implementation Plan for accomplishing stabilization of plutonium-bearing residues in response to the Recommendation and the Assessment was published by DOE on February 28, 1995. This Implementation Plan (IP) commits to stabilizing problem materials within 3 years, and stabilizing all other materials withinmore » 8 years. The IP identifies approximately 20 metric tons of plutonium requiring stabilization and/or repackaging. A further breakdown shows this material to consist of 8.5 metric tons of plutonium metal and alloys, 5.5 metric tons of plutonium as oxide, and 6 metric tons of plutonium as residues. Stabilization of the metal and oxide categories containing greater than 50 weight percent plutonium is covered by DOE Standard {open_quotes}Criteria for Safe Storage of Plutonium Metals and Oxides{close_quotes} December, 1994 (DOE-STD-3013-94). This standard establishes criteria for safe storage of stabilized plutonium metals and oxides for up to 50 years. Each of the DOE sites and contractors with large plutonium inventories has either started or is preparing to start stabilization activities to meet these criteria.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eccleston, C.H.
1997-09-05
The National Environmental Policy Act (NEPA) of 1969 was established by Congress more than a quarter of a century ago, yet there is a surprising lack of specific tools, techniques, and methodologies for effectively implementing these regulatory requirements. Lack of professionally accepted techniques is a principal factor responsible for many inefficiencies. Often, decision makers do not fully appreciate or capitalize on the true potential which NEPA provides as a platform for planning future actions. New approaches and modem management tools must be adopted to fully achieve NEPA`s mandate. A new strategy, referred to as Total Federal Planning, is proposed formore » unifying large-scale federal planning efforts under a single, systematic, structured, and holistic process. Under this approach, the NEPA planning process provides a unifying framework for integrating all early environmental and nonenvironmental decision-making factors into a single comprehensive planning process. To promote effectiveness and efficiency, modem tools and principles from the disciplines of Value Engineering, Systems Engineering, and Total Quality Management are incorporated. Properly integrated and implemented, these planning tools provide the rigorous, structured, and disciplined framework essential in achieving effective planning. Ultimately, the goal of a Total Federal Planning strategy is to construct a unified and interdisciplinary framework that substantially improves decision-making, while reducing the time, cost, redundancy, and effort necessary to comply with environmental and other planning requirements. At a time when Congress is striving to re-engineer the governmental framework, apparatus, and process, a Total Federal Planning philosophy offers a systematic approach for uniting the disjointed and often convoluted planning process currently used by most federal agencies. Potentially this approach has widespread implications in the way federal planning is approached.« less
Environmental Management System Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fox, Robert; Thorson, Patrick; Horst, Blair
2009-03-24
Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and othermore » natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environment will be evaluated. Objectives and targets will be developed (or updated) for each aspect that is determined to have a significant impact. Environmental Management Programs (EMPs) will be prepared (or updated) to document actions necessary for reducing certain environmental impacts. Each EMP will identify responsible parties and associated target deadlines for each action. Quarterly, environmental programs will be reviewed for compliance issues and effectiveness. Annually, an internal assessment will be performed to evaluate the progress of the EMS, and LBNL senior management will review the results. In addition, at least once every 3 years a third-party audit will be performed to validate that the EMS is being implemented according to plan.« less
EMP Attachment 3 DOE-SC PNNL Site Dose Assessment Guidance
DOE Office of Scientific and Technical Information (OSTI.GOV)
Snyder, Sandra F.
2011-12-21
This Dose Assessment Guidance (DAG) describes methods to use to determine the Maximally-Exposed Individual (MEI) location and to estimate dose impact to that individual under the U.S. Department of Energy Office of Science (DOE-SC) Pacific Northwest National Laboratory (PNNL) Site Environmental Monitoring Plan (EMP). This guidance applies to public dose from radioactive material releases to the air from PNNL Site operations. This document is an attachment to the Pacific Northwest National Laboratory (PNNL) Environmental Monitoring Plan (EMP) and describes dose assessment guidance for radiological air emissions. The impact of radiological air emissions from the U.S. Department of Energy Office ofmore » Science (DOE-SC) PNNL Site is indicated by dose estimates to a maximally exposed member of the public, referred to as the maximally exposed individual (MEI). Reporting requirements associated with dose to members of the public from radiological air emissions are in 40 CFR Part 61.94, WAC 246-247-080, and DOE Order 458.1. The DOE Order and state standards for dose from radioactive air emissions are consistent with U.S. Environmental Protection Agency (EPA) dose standards in 40 CFR 61.92 (i.e., 10 mrem/yr to a MEI). Despite the fact that the current Contract Requirements Document (CRD) for the DOE-SC PNNL Site operations does not include the requirement to meet DOE CRD 458.1, paragraph 2.b, public dose limits, the DOE dose limits would be met when EPA limits are met.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rockhold, Mark L.; Bacon, Diana H.; Freedman, Vicky L.
2013-10-01
This report represents a synthesis and integration of basic and applied research into a system-scale model of the Hanford 300 Area groundwater uranium plume, supported by the U.S. Department of Energy’s Richland Operations (DOE-RL) office. The report integrates research findings and data from DOE Office of Science (DOE-SC), Office of Environmental Management (DOE-EM), and DOE-RL projects, and from the site remediation and closure contractor, Washington Closure Hanford, LLC (WCH). The three-dimensional, system-scale model addresses water flow and reactive transport of uranium for the coupled vadose zone, unconfined aquifer, and Columbia River shoreline of the Hanford 300 Area. The system-scale modelmore » of the 300 Area was developed to be a decision-support tool to evaluate processes of the total system affecting the groundwater uranium plume. The model can also be used to address “what if” questions regarding different remediation endpoints, and to assist in design and evaluation of field remediation efforts. For example, the proposed cleanup plan for the Hanford 300 Area includes removal, treatment, and disposal of contaminated sediments from known waste sites, enhanced attenuation of uranium hot spots in the vadose and periodically rewetted zone, and continued monitoring of groundwater with institutional controls. Illustrative simulations of polyphosphate infiltration were performed to demonstrate the ability of the system-scale model to address these types of questions. The use of this model in conjunction with continued field monitoring is expected to provide a rigorous basis for developing operational strategies for field remediation and for defining defensible remediation endpoints.« less
Support to LANL: Cost estimation. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This report summarizes the activities and progress by ICF Kaiser Engineers conducted on behalf of Los Alamos National Laboratories (LANL) for the US Department of Energy, Office of Waste Management (EM-33) in the area of improving methods for Cost Estimation. This work was conducted between October 1, 1992 and September 30, 1993. ICF Kaiser Engineers supported LANL in providing the Office of Waste Management with planning and document preparation services for a Cost and Schedule Estimating Guide (Guide). The intent of the Guide was to use Activity-Based Cost (ABC) estimation as a basic method in preparing cost estimates for DOEmore » planning and budgeting documents, including Activity Data Sheets (ADSs), which form the basis for the Five Year Plan document. Prior to the initiation of the present contract with LANL, ICF Kaiser Engineers was tasked to initiate planning efforts directed toward a Guide. This work, accomplished from June to September, 1992, included visits to eight DOE field offices and consultation with DOE Headquarters staff to determine the need for a Guide, the desired contents of a Guide, and the types of ABC estimation methods and documentation requirements that would be compatible with current or potential practices and expertise in existence at DOE field offices and their contractors.« less
ERIC Educational Resources Information Center
McConnell, R. A.
1970-01-01
Indicates why selective breeding for intelligence is biologically practical and suggests that positive eugenics is the only answer now available to our need for more intelligence. Procedure does not seem immoral. Quotes H. J. Muller's values to be recognized in eugenic planning." Does not prescribe program. (AL)
34 CFR 637.32 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2014 CFR
2014-07-01
... POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM How Does... for enhancing the institution's capacity for improving and maintaining quality science education for... science education improvement plans will be developed with the technical assistance provided under the...
34 CFR 637.32 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2012 CFR
2012-07-01
... POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM How Does... for enhancing the institution's capacity for improving and maintaining quality science education for... science education improvement plans will be developed with the technical assistance provided under the...
34 CFR 637.32 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2011 CFR
2011-07-01
... POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM How Does... for enhancing the institution's capacity for improving and maintaining quality science education for... science education improvement plans will be developed with the technical assistance provided under the...
34 CFR 637.32 - What selection criteria does the Secretary use?
Code of Federal Regulations, 2013 CFR
2013-07-01
... POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM How Does... for enhancing the institution's capacity for improving and maintaining quality science education for... science education improvement plans will be developed with the technical assistance provided under the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Pollution Prevention (P2) has evolved into one of DOE`s sprime strategies to meet environmental, fiscal, and worker safety obligations. P2 program planning, opportunity identification, and implementation tools were developed under the direction of the Waste Minimization Division (EM-334). Forty experts from EM, DP, ER and DOE subcontractors attended this 2-day workshop to formulate the incentives to drive utilization of these tools. Plenary and small working group sessions were held both days. Working Group 1 identified incentives to overcoming barriers in the area of P2 program planning and resource allocation. Working Group 2 identified mechanisms to drive the completion of P2more » assessments and generation of opportunities. Working Group 3 compiled and documented a broad range of potential P2 incentives that address fundamental barriers to implementation of cost effective opportunities.« less
sCO2 Power Cycles Summit Summary November 2017.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mendez Cruz, Carmen Margarita; Rochau, Gary E.; Lance, Blake
Over the past ten years, the Department of Energy (DOE) has helped to develop components and technologies for the Supercritical Carbon Dioxide (sCO2) power cycle capable of efficient operation at high temperatures and high efficiency. The DOE Offices of Fossil Energy, Nuclear Energy, and Energy Efficiency and Renewable Energy collaborated in the planning and execution of the sCO2 Power Cycle Summit conducted in Albuquerque, NM in November 2017. The summit brought together participants from government, national laboratories, research, and industry to engage in discussions regarding the future of sCO 2 Power Cycles Technology. This report summarizes the work involved inmore » summit planning and execution, before, during, and after the event, including the coordination between three DOE offices and technical content presented at the event.« less
Does scale matter? The costs of HIV-prevention interventions for commercial sex workers in India.
Guinness, Lorna; Kumaranayake, Lilani; Rajaraman, Bhuvaneswari; Sankaranarayanan, Girija; Vannela, Gangadhar; Raghupathi, P.; George, Alex
2005-01-01
OBJECTIVE: To explore how the scale of a project affects both the total costs and average costs of HIV prevention in India. METHODS: Economic cost data and measures of scale (coverage and service volume indicators for number of cases of sexually transmitted infections (STIs) referred, number of STIs treated, condoms distributed and contacts made with target groups) were collected from 17 interventions run by nongovernmental organizations aimed at commercial sex workers in southern India. Nonparametric methods and regression analyses were used to look at the relationship between total costs, unit costs and scale. FINDINGS: Coverage varied from 250 to 2008 sex workers. Annual costs ranged from US$ 11 274 to US$ 52 793. The median cost per sex worker reached was US$ 19.21 (range = US$ 10.00-51.00). The scale variables explain more than 50% of the variation in unit costs for all of the unit cost measures except cost per contact. Total costs and unit costs have non-linear relationships to scale. CONCLUSION: Average costs vary with the scale of the project. Estimates of resource requirements based on a constant average cost could underestimate or overestimate total costs. The results highlight the importance of improving scale-specific cost information for planning. PMID:16283051
Lawrence Berkeley National Laboratory 2015 Annual Financial Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Williams, Kim, P
FY2015 financial results reflect a year of significant scientific, operational and financial achievement for Lawrence Berkeley National Laboratory. Complementing many scientific accomplishments, Berkeley Lab completed construction of four new research facilities: the General Purpose Laboratory, Chu Hall, Wang Hall and the Flexlab Building Efficiency Testbed. These state-of-the-art facilities allow for program growth and enhanced collaboration, in part by enabling programs to return to the Lab’s Hill Campus from offsite locations. Detailed planning began for the new Integrative Genomics Building (IGB) that will house another major program currently located offsite. Existing site infrastructure was another key focus area. The Lab prioritizedmore » and increased investments in deferred maintenance in alignment with the Berkeley Lab Infrastructure Plan, which was developed under the leadership of the DOE Office of Science. With the expiration of American Recovery and Reinvestment Act (ARRA) funds, we completed the close-out of all of our 134 ARRA projects, recording total costs of $331M over the FY2009-2015 period. Download the report to read more.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kreie, Ken; Traub, David
The 2001 Long-Term Surveillance Plan (LTSP) for the US. Department of Energy Sherwood Project (UMI'RCA Title II) Reclamation Cell, Wellpinit, Washington, does not require groundwater compliance monitoring at the Sherwood site. However, the LTSP stipulates limited groundwater monitoring for chloride and sulfate (designated indicator parameters) and total dissolved solids (TDS) as a best management practice. Samples were collected from the background well, MW-2B, and the two downgradient wells, MW-4 and MW-10, in accordance with the LTSP. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for US. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351,more » continually updated). Water levels were measured in all wells prior to sampling and in four piezometers completed in the tailings dam. Time-concentration graphs included in this report indicate that the chloride, sulfate, and TDS concentrations are consistent with historical measurements. The concentrations of chloride and sulfate are well below the State of Washington water quality criteria value of 250 milligrams per liter (mg/L) for both parameters.« less
42 CFR 436.219 - Individuals receiving State plan home and community-based services.
Code of Federal Regulations, 2014 CFR
2014-10-01
... eligible for Medicaid; (2) Have income that does not exceed 150 percent of the Federal poverty line (FPL... Security Income Federal Benefit Rate (SSI/FBR); and (3) Will receive State plan home and community-based...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Section 250.202 Mineral Resources BUREAU OF OCEAN ENERGY MANAGEMENT, REGULATION, AND ENFORCEMENT...; and (e) Does not cause undue or serious harm or damage to the human, marine, or coastal environment. ...
Does Company Strategy Have Any Lessons for Educational Planning?
ERIC Educational Resources Information Center
Bienayme, Alain
1989-01-01
Discusses the recent crisis in educational planning, proposing the adoption of business models for educational management. Describes ways to apply this approach to education policy. Identifies the problems of education, and suggests guidelines for change in educational policy. (RW)
25 CFR 170.227 - How does BIA develop and use the IRR Inventory?
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 1 2010-04-01 2010-04-01 false How does BIA develop and use the IRR Inventory? 170.227... Planning (lrtp) § 170.227 How does BIA develop and use the IRR Inventory? The IRR Inventory as defined in § 170.442 identifies the transportation need by providing the data that BIA uses to generate the Cost to...
40 CFR 60.2997 - How does the model rule relate to the required elements of my State plan?
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 6 2011-07-01 2011-07-01 false How does the model rule relate to the... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES... Construction On or Before December 9, 2004 Model Rule-Use of Model Rule § 60.2997 How does the model rule...
40 CFR 60.2997 - How does the model rule relate to the required elements of my State plan?
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 7 2013-07-01 2013-07-01 false How does the model rule relate to the... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES... Construction On or Before December 9, 2004 Model Rule-Use of Model Rule § 60.2997 How does the model rule...
40 CFR 60.2997 - How does the model rule relate to the required elements of my State plan?
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 6 2010-07-01 2010-07-01 false How does the model rule relate to the... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES... Construction On or Before December 9, 2004 Model Rule-Use of Model Rule § 60.2997 How does the model rule...
40 CFR 60.2997 - How does the model rule relate to the required elements of my State plan?
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 7 2012-07-01 2012-07-01 false How does the model rule relate to the... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES... Construction On or Before December 9, 2004 Model Rule-Use of Model Rule § 60.2997 How does the model rule...
40 CFR 60.2997 - How does the model rule relate to the required elements of my State plan?
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 7 2014-07-01 2014-07-01 false How does the model rule relate to the... PROTECTION AGENCY (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES... Construction On or Before December 9, 2004 Model Rule-Use of Model Rule § 60.2997 How does the model rule...
Defense Depot Mechanicsburg Total Quality Management Implementation Plan
1989-06-01
B T I TLEE 5 . FUNDING NUMBERS Defense Depot Mechanicsburg Total Quality Management Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME...Form 298 (Rev. 2-89) L296- 102 Acces.ion For NYI J ... I:: ted DEFENSE DEPOT MECHANICSBURG PENNSYLVANIAL--I By_ TOTAL QUALITY MANAGEMENT K_~ t buty-n...IMPLEMENTATION PLAN Avmail-t!Ilty Codes IvLl c 2Dd/or JUN 3 0 1989 iDizt Special PURPOSE The purpose of this Total Quality Management Implementation
1989-07-01
FUNDING NUMBERS DRMS Total Quality Management (TQM) Implementation Plan 6. AUTHOR(S) 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) 8. PERFORMING...OF PAGES TOM (Total Quality Management ), Continuous Process Improvement. ’f’ - Management 16. PRICE CODE 17. SECURITY CLASSIFICATION 18. SECURITY...7540-01-280-5500 Standard Form 298 (Rev. 2-89) Pr"cried by ANi SWt 139-i 296-101 DRMS TOTAL QUALITY MANAGEMENT (TQM) IMPLEMENTATION PLAN PURPOSE The
SAVY-4000 Surveillance and Life Extension Program Fiscal Year 2013 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Stone, Timothy A.; Blair, Michael W.; Weis, Eric
2014-03-03
The Packaging Surveillance Program section of the DOE M441.1-1 /sup>1, Nuclear Material Packaging Manual (DOE, 2008) requires DOE contractors to “ensure that a surveillance program is established and implemented to ensure the nuclear material storage package continues to meet its design criteria.” In order to ensure continuing safe storage of nuclear material and the maximization of risk reduction, TA-55 has established a Surveillance Program to ensure storage container integrity for operations within its specified design life. The LANL SAVY-4000 Field Surveillance Plan2 defines the near-term field surveillance plan for SAVY-4000 containers as required by the Manual. A long-term surveillance planmore » will be established based on the results of the first several years of surveillance and the results of the lifetime extension studies as defined in the Accelerated Aging Plan3. This report details progress in positioning the Surveillance Program for successful implementation in FY14 and status of the Design Life Extension Program in terms of its implementation and data collection for FY13.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vargo, G.F. Jr.
1994-10-11
The DOE Standard defines the configuration management program by the five basic program elements of ``program management,`` ``design requirements,`` ``document control,`` ``change control,`` and ``assessments,`` and the two adjunct recovery programs of ``design reconstitution,`` and ``material condition and aging management. The C-M model of five elements and two adjunct programs strengthen the necessary technical and administrative control to establish and maintain a consistent technical relationship among the requirements, physical configuration, and documentation. Although the DOE Standard was originally developed for the operational phase of nuclear facilities, this plan has the flexibility to be adapted and applied to all life-cycle phasesmore » of both nuclear and non-nuclear facilities. The configuration management criteria presented in this plan endorses the DOE Standard and has been tailored specifically to address the technical relationship of requirements, physical configuration, and documentation during the full life-cycle of the 101-SY Hydrogen Mitigation Test Project Mini-Data Acquisition and Control System of Tank Waste Remediation System.« less
Probabilistic approach to long range planning of manpower
NASA Technical Reports Server (NTRS)
Lejk, R. A.
1967-01-01
Publication presents a total long range planning model for project oriented organizations. The total model consists of planning systems which originate - /1/ at the project level and consolidate into an overall plan, and /2/ from a budetary ceiling and allocate to the individual projects. Analysis of /1/ and /2/ is provided for management decision making.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alexander, Amanda K.; Sackschewsky, Michael R.; Duberstein, Corey A.
In 2003 the U.S. Department of Energy (DOE) constructed an Emergency Vehicle Operations Course (EVOC) at the Hazardous Material Management and Emergency Response Training and Education Center (HAMMER) in the southern portion of the Hanford Site. Preliminary surveys during 2001 identified an active burrowing owl (Athene cunicularia) burrow and three burrowing owls within the proposed development area. Burrowing owls were classified as a federal species of concern, a Washington State ?candidate? species, a Washington Department of Fish and Wildlife priority species, and a Hanford Site Biological Resources Management Plan Level III resource. Therefore, the mitigation action plan for the projectmore » included the installation of twenty artificial burrows around EVOC in the spring of 2003. The mitigation plan established a success criterion of five percent annual use of the burrows by owls. In July 2005, a field survey of the EVOC burrow complex was conducted to determine use and demography at each site. Burrow locations were mapped and signs of activity (feces, owl tracks, castings, feathers) were recorded. Out of the twenty burrows, twelve were found to be active. Of the eight inactive burrows three appeared to have been active earlier in the 2005 breeding season. A total of nineteen owls were counted but demography could not be determined. It appears that the EVOC mitigation exceeded burrow use goals during 2005. Continued site monitoring and maintenance, according to mitigation plan guidelines should be conducted as prescribed.« less
The Attitude-Behavior Discrepancy in Medical Decision Making
He, Fei; Li, Dongdong; Cao, Rong; Zeng, Juli; Guan, Hao
2014-01-01
Background: In medical practice, the dissatisfaction of patients about medical decisions made by doctors is often regarded as the fuse of doctor-patient conflict. However, a few studies have looked at why there are such dissatisfactions. Objectives: This experimental study aimed to explore the discrepancy between attitude and behavior within medical situations and its interaction with framing description. Patients and Methods: A total of 450 clinical undergraduates were randomly assigned to six groups and investigated using the classic medical decision making problem, which was described either in a positive or a negative frame (2) × decision making behavior\\attitude to risky plan\\attitude to conservative plan (3). Results: A discrepancy between attitude and behavior did exist in medical situations. Regarding medical dilemmas, if the mortality rate was described, subjects had a significant tendency to choose a conservative plan (t = 3.55, P < 0.01) yet if the survival rate was described, there was no such preference (t = -1.48, P > 0.05). However, regardless of the plan chosen by the doctor, the subjects had a significant opposing attitude (P < .05). Framing description had a significant impact on both decision making behavior and attitude (t behavior = -3.24, P < 0.01;t attitude to surgery = 4.08,P < 0.01;t attitude to radiation = -2.15,P < 0.05). Conclusions: A discrepancy of attitude-behavior does exist in medical situations. The framing of a description has an impact on medical decision-making. PMID:25763230
26 CFR 1.401(a)(5)-1 - Special rules relating to nondiscrimination requirements.
Code of Federal Regulations, 2012 CFR
2012-04-01
... employees. (d) Certain disparity permitted. Under section 401(a)(5)(C), a plan does not discriminate in... compensation within the meaning of section 3231(e). For this purpose, a plan maintained for a self-employed... deemed to be a plan maintained by an employer that pays wages within the meaning of section 3121(a). (iii...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-16
... all of its operational expenses; and (g) The Plan does not pay any fees or other expenses in... Applicant), D-11456; and 2010-27, The Finishing Trades Institute of the Mid-Atlantic Region (the Plan), L..., effective December 31, 1978, section 102 of Reorganization Plan No. 4 of 1978, 5 U.S.C. App. 1 (1996...
Water Management Planning: A Case Study at Blue Grass Army Depot
DOE Office of Scientific and Technical Information (OSTI.GOV)
Solana, Amy E.; Mcmordie, Katherine
2006-04-03
Executive Order 13123, Greening the Government Through Efficient Energy Management, mandates an aggressive policy for reducing potable water consumption at federal facilities. Implementation guid¬ance from the U.S. Department of Energy (DOE) set a requirement for each federal agency to “reduce potable water usage by implementing life cycle, cost-effective water efficiency programs that include a water management plan, and not less than four Federal Energy Management Program (FEMP) Best Manage¬ment Practices (BMPs).” The objective of this plan is to gain full compliance with Executive Order 13123 and associated DOE implementation guidance on behalf of Blue Grass Army Depot (BGAD), Richmond, Kentucky.more » In accordance with this plan, BGAD must: • Incorporate the plan as a component of the Installation energy conservation plan • Investigate the water savings potential and life-cycle cost effectiveness of the Operations and Maintenance (O&M) and retrofit/replacement options associated with the ten FEMP BMPs • Put into practice all applicable O&M options • Identify retrofit/replacement options appropriate for implementation (based upon calculation of the simple payback periods) • Establish a schedule for implementation of applicable and cost-effective retrofit/replacement options.« less
7 CFR 3550.53 - Eligibility requirements.
Code of Federal Regulations, 2013 CFR
2013-01-01
... where an applicant successfully completed a bankruptcy debt restructuring plan and has demonstrated a... plus recurring monthly debts does not exceed 41 percent of the applicant's repayment income. (2) A low... pay PITI plus recurring monthly debts does not exceed 41 percent of repayment income. (3) Repayment...
7 CFR 3550.53 - Eligibility requirements.
Code of Federal Regulations, 2012 CFR
2012-01-01
... where an applicant successfully completed a bankruptcy debt restructuring plan and has demonstrated a... plus recurring monthly debts does not exceed 41 percent of the applicant's repayment income. (2) A low... pay PITI plus recurring monthly debts does not exceed 41 percent of repayment income. (3) Repayment...
7 CFR 3550.53 - Eligibility requirements.
Code of Federal Regulations, 2011 CFR
2011-01-01
... where an applicant successfully completed a bankruptcy debt restructuring plan and has demonstrated a... plus recurring monthly debts does not exceed 41 percent of the applicant's repayment income. (2) A low... pay PITI plus recurring monthly debts does not exceed 41 percent of repayment income. (3) Repayment...
7 CFR 3550.53 - Eligibility requirements.
Code of Federal Regulations, 2014 CFR
2014-01-01
... where an applicant successfully completed a bankruptcy debt restructuring plan and has demonstrated a... plus recurring monthly debts does not exceed 41 percent of the applicant's repayment income. (2) A low... pay PITI plus recurring monthly debts does not exceed 41 percent of repayment income. (3) Repayment...
2009 DOE Vehicle Technologies Program Annual Merit Review
DOE Office of Scientific and Technical Information (OSTI.GOV)
none,
2009-10-01
Annual Merit Review and Peer Evaluation Meeting to review the FY2008 accomplishments and FY2009 plans for the Vehicle Technologies Program, and provide an opportunity for industry, government, and academic to give inputs to DOE on the Program with a structured and formal methodology.
results, and working closely with industry and DOE serving as a Project Leader and a Principal Investigator Management of reporting requirements to DOE for financial forecasts, milestone reports, and annual operating plans Management of communications projects for the NREL Biomass program and Bioenergy
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rigsby V.P.
2009-02-12
In 1989, the Oak Ridge Reservation (ORR), which includes the East Tennessee Technology Park (ETTP), was placed on the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA) National Priorities List. The Federal Facility Agreement (FFA) (DOE 1992), effective January 1, 1992, now governs environmental restoration activities conducted under CERCLA at the ORR. Following signing of the FFA, U.S. Department of Energy (DOE), U.S. Environmental Protection Agency (EPA), and the state of Tennessee signed the Oak Ridge Accelerated Cleanup Plan Agreement on June 18, 2002. The purpose of this agreement is to define a streamlined decision-making process to facilitatemore » the accelerated implementation of cleanup, resolve ORR milestone issues, and establish future actions necessary to complete the accelerated cleanup plan by the end of fiscal year 2008. While the FFA continues to serve as the overall regulatory framework for remediation, the Accelerated Cleanup Plan Agreement supplements existing requirements to streamline the decision-making process. Decontamination and decommissioning (D&D) activities of Bldg. K-25, the original gaseous diffusion facility, is being conducted by Bechtel Jacobs Company LLC (BJC) on behalf of the DOE. The planned CERCLA action covering disposal of building structure and remaining components from the K-25 building is scheduled as a non-time-critical CERCLA action as part of DOE's continuous risk reduction strategy for ETTP. The K-25 building is proposed for D&D because of its poor physical condition and the expense of surveillance and maintenance activities. The K-25/K-27 D&D Project proposes to dispose of the commingled waste listed below from the K-25 west side building structure and remaining components and process gas equipment and piping at the Environmental Management Waste Management Facility (EMWMF) under waste disposal proxy lot (WPXL) 6.999: (1) Building structure (e.g. concrete floors [excluding basement slab], roofing, structural steel supports, interior walls, and exterior walls) and support system components including the recirculation cooling water (RCW); electrical; communication; fire protection; ventilation; process coolant; process lube oil; utilities such as steam, water and drain lines; (2) Process Piping; (3) Seal Exhaust Headers; (4) Seal Exhaust Traps; (5) Process Valves; (6) Differential Blind Multipliers (DBM)/Partial Blind Multipliers (PBM); and (7) Aftercoolers (also known as Intercell coolers). Converters and compressors while components of the process gas system, are not included in this commingled waste lot. On January 6, 2009, a meeting was held with EPA, TDEC, DOE and the team for the sole purpose of finalizing the objectives, format, and content of WPXL 6.999. The objective of WPXL 6.999 was to provide a crosswalk to the building structure and the PGE components profiles. This was accomplished by providing tables with references to the specific section of the individual profiles for each of the WLs. There are two building profiles and eight PGE profiles. All of the waste identified in the individual profiles will be commingled, shipped, and disposed exclusively under WPXL 6.999. The individual profiles were provided to the EPA and Tennessee Department of Environment and Conservation (TDEC) for information purposes only. This summary WPXL 6.999 will be submitted to EPA, TDEC, and DOE for review and approval. The format agreed upon by the regulators and DOE form the basis for WPXL 6.999. The agreed format is found on pages v and vi of the CONTENTS section of this profile. The disposal of this waste will be executed in accordance with the Action Memorandum for the Decontamination and Decommissioning of the K-25 and K-27 Buildings, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2002), Removal Action Work Plan for the K-25 and K-27 Buildings, Process Equipment Removal and Demolition, K-25/K-27 Project, East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008a); Waste Handling Plan for Demolition of the K-25 and K-27 Building Structures and Remaining Components Located at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2005); and Waste Handling Plan for Building K-25 West Wing Process Equipment and Piping at the East Tennessee Technology Park, Oak Ridge, Tennessee (DOE 2008b).« less
Bierman, A S; Bubolz, T A; Fisher, E S; Wasson, J H
1999-01-01
Responses to simple questions that predict subsequent health care utilization are of interest to both capitated health plans and the payer. To determine how responses to a single question about general health status predict subsequent health care expenditures. Participants in the 1992 Medicare Current Beneficiary Survey were asked the following question: "In general, compared to other people your age, would you say your health is: excellent, very good, good, fair or poor?" To obtain each participant's total Medicare expenditures and number of hospitalizations in the ensuing year, we linked the responses to this question with data from the 1993 Medicare Continuous History Survey. Nationally representative sample of 8775 noninstitutionalized Medicare beneficiaries 65 years of age and older. Annual age- and sex-adjusted Medicare expenditures and hospitalization rates. Eighteen percent of the beneficiaries rated their health as excellent, 56% rated it as very good or good, 17% rated it as fair, and 7% rated it as poor. Medicare expenditures had a marked inverse relation to self-assessed health ratings. In the year after assessment, age- and sex-adjusted annual expenditures varied fivefold, from $8743 for beneficiaries rating their health as poor to $1656 for beneficiaries rating their health as excellent. Hospitalization rates followed the same pattern: Respondents who rated their health as poor had 675 hospitalizations per 1000 beneficiaries per year compared with 136 per 1000 for those rating their health as excellent. The response to a single question about general health status strongly predicts subsequent health care utilization. Self-reports of fair or poor health identify a group of high-risk patients who may benefit from targeted interventions. Because the current Medicare capitation formula does not account for health status, health plans can maximize profits by disproportionately enrolling beneficiaries who judge their health to be good. However, they are at a competitive disadvantage if they enroll beneficiaries who view themselves as sick.
Bansal, Gaurav J; Santosh, Divya; Davies, Eleri L
2016-01-01
The purpose of this study was to evaluate whether high mammographic density can be used as one of the selection criteria for MRI in invasive lobular breast cancer (ILC). In our institute, high breast density has been used as one of the indications for performing MRI scan in patients with ILC. We divided the patients in two groups, one with MRI performed pre-operatively and other without MRI. We compared their surgical procedures and analyzed whether surgical plan was altered after MRI. In case of alteration of plan, we analyzed whether the change was adequate by comparing post-operative histological findings. Between 2011 and 2015, there were a total of 1601 breast cancers with 97 lobular cancers, out of which 36 had pre-operative MRI and 61 had no MRI scan. 12 (33.3%) had mastectomy following MRI, out of which 9 (25%) had change in surgical plan from conservation to mastectomy following MRI. There were no unnecessary mastectomies in the MRI group. However, utilization of MRI in this cohort of patients did not reduce reoperation rate (19.3%). Lobular carcinoma in situ (LCIS) was identified in 60% of reoperations on post-surgical histology. Patients in the "No MRI" group had higher mastectomy rate 26 (42.6%), which was again appropriate. High mammographic density is a useful risk stratification criterion for selective MRI in ILC within a multidisciplinary team meeting setting. Provided additional lesions identified on MRI are confirmed with biopsy, pre-operative MRI does not cause unnecessary mastectomies. Used in this selective manner, reoperation rates were not eliminated, albeit reduced when compared to literature. High mammographic breast density can be used as one of the selection criteria for pre-operative MRI in ILC without an increase in inappropriate mastectomies with potential time and cost savings. In this cohort, re-excisions were not reduced markedly with pre-operative MRI.
12 CFR 563b.200 - What actions may OTS take on my application?
Code of Federal Regulations, 2010 CFR
2010-01-01
... record under part 563e of this chapter and your business plan to determine how you will serve the... that you will serve. (2) OTS may deny your application if your business plan does not demonstrate that...
29 CFR 1908.3 - Eligibility and funding.
Code of Federal Regulations, 2010 CFR
2010-07-01
... agreement with the Assistant Secretary to perform consultation for private sector employers; except that a... if that Plan does not include provisions for federally funded consultation to private sector... in providing consultation to private sector employers only. (i) In all States with Plans approved...
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
The SSL R&D Plan provides analysis and direction for ongoing R&D activities to advance SSL technology and increase energy savings. The R&D Plan also reviews SSL technology status and trends for both LEDs and OLEDs and offers an overview of the current DOE SSL R&D project portfolio.
DOT National Transportation Integrated Search
2013-04-01
The Pickens Plan is a highly promoted U.S. energy strategy, proposing to use natural gas as a transportation fuel to : displace imported oil and, simultaneously, to increase renewable contributions to national electricity production. While the ...
Threatened and Endangered Species Habitat Management Plan for Los Alamos National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hathcock, Charles Dean; Keller, David Charles; Thompson, Brent E.
Los Alamos National Laboratory’s (LANL) Threatened and Endangered Species Habitat Management Plan (HMP) fulfills a commitment made to the U.S. Department of Energy (DOE) in the “Final Environmental Impact Statement for the Dual-Axis Radiographic Hydrodynamic Test Facility Mitigation Action Plan” (DOE 1996). The HMP received concurrence from the U.S. Fish and Wildlife Service (USFWS) in 1999 (USFWS consultation numbers 2-22-98-I-336 and 2-22-95-I-108). This 2017 update retains the management guidelines from the 1999 HMP for listed species, and updates some descriptive information.
ERIC Educational Resources Information Center
Piri, Faramarz; Barati, Hossein; Ketabi, Saeed
2012-01-01
Previous studies on the effect of planning on language production have revealed that planning does have a positive effect on language performance in terms of fluency, complexity, and accuracy. The present study was an attempt to investigate the effects of pre-task, on-line, and both pre-task and on-line planning on fluency, accuracy, and…
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 18 2012-07-01 2012-07-01 false Oregon. 81.338 Section 81.338... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.338 Oregon. Oregon—SO2 Designated area Does not meet primary standards Does not meet secondary standards Cannot be...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 18 2013-07-01 2013-07-01 false Oregon. 81.338 Section 81.338... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.338 Oregon. Oregon—SO2 Designated area Does not meet primary standards Does not meet secondary standards Cannot be...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 18 2013-07-01 2013-07-01 false Minnesota. 81.324 Section 81.324... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.324 Minnesota. Minnesota—SO2 Designated area Does not meet primary standards Does not meet secondary standards Cannot be...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 18 2012-07-01 2012-07-01 false Minnesota. 81.324 Section 81.324... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.324 Minnesota. Minnesota—SO2 Designated area Does not meet primary standards Does not meet secondary standards Cannot be...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 18 2013-07-01 2013-07-01 false Colorado. 81.306 Section 81.306... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.306 Colorado. Colorado—SO2 Designated Area Does not meet primary standards Does not meet secondary standards Cannot be...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 18 2012-07-01 2012-07-01 false Colorado. 81.306 Section 81.306... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.306 Colorado. Colorado—SO2 Designated Area Does not meet primary standards Does not meet secondary standards Cannot be...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 17 2011-07-01 2011-07-01 false Colorado. 81.306 Section 81.306... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.306 Colorado. Colorado—SO2 Designated Area Does not meet primary standards Does not meet secondary standards Cannot be...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 17 2010-07-01 2010-07-01 false Hawaii. 81.312 Section 81.312... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.312 Hawaii. Hawaii—TSP Designated area Does not meet primary standards Does not meet secondary standards Cannot be...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 18 2013-07-01 2013-07-01 false Wisconsin. 81.350 Section 81.350... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.350 Wisconsin. Wisconsin—SO2 Designated area Does not meet primary standards Does not meet secondary standards Cannot be...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 18 2012-07-01 2012-07-01 false Wisconsin. 81.350 Section 81.350... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.350 Wisconsin. Wisconsin—SO2 Designated area Does not meet primary standards Does not meet secondary standards Cannot be...
DOE planning workshop advanced biomedical technology initiative
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-06-01
The Department of Energy has mad major contributions in the biomedical sciences with programs in medical applications and instrumentation development, molecular biology, human genome, and computational sciences. In an effort to help determine DOE`s role in applying these capabilities to the nation`s health care needs, a planning workshop was held on January 11--12, 1994. The workshop was co-sponsored by the Department`s Office of Energy Research and Defense Programs organizations. Participants represented industry, medical research institutions, national laboratories, and several government agencies. They attempted to define the needs of the health care industry. identify DOE laboratory capabilities that address these needs,more » and determine how DOE, in cooperation with other team members, could begin an initiative with the goals of reducing health care costs while improving the quality of health care delivery through the proper application of technology and computational systems. This document is a report of that workshop. Seven major technology development thrust areas were considered. Each involves development of various aspects of imaging, optical, sensor and data processing and storage technologies. The thrust areas as prioritized for DOE are: (1) Minimally Invasive Procedures; (2) Technologies for Individual Self Care; (3) Outcomes Research; (4) Telemedicine; (5) Decision Support Systems; (6) Assistive Technology; (7) Prevention and Education.« less
Document control and Conduct of Operations
DOE Office of Scientific and Technical Information (OSTI.GOV)
Collins, S.K.; Meltzer, F.L.
1993-01-01
Department of Energy (DOE) Order 5480.19, Conduct of operations, places stringent requirements on a wide range of activities at DOE facilities. These requirements directly affect personnel at the Advanced Test Reactor (ATR), which is located in the Test Reactor Area of the Idaho National Engineering Laboratory and operated for DOE by EG G Idaho, Inc. In order for the ATR to comply with 5480.19, the very personality of the reactor facility's document control unit has had to undergo a major change. The Facility and Administrative Support Unit (FAS) is charged with nudntenance of ATR's controlled ddcuments-diousands of operating and administrativemore » procedures. Prior to the imposition of 5480.19, FAS was content to operate in a clerical support mode, seldom questioning or seeking to improve. This numer of doing business is inappropriate within the framework of DOE 5480.19 and is also at odds with the approach to Total Quality Management (TQM) promulgated by EG G Idaho.To comply with the requirements of 5480.19, FAS has Actively applied TQM principles. Empowered personnel to unprove operations through the establishment of a teatn approach. Begun an automation process that is already paying large dividends in terms of improved procedure accuracy and compliance. A state-of-the-art text retrival system is already in place. We are vigorously pursuing fully automated document tmcidng and document management. This paper describes in detail the steps taken to date, the improvements and the lessons learned. It aLw discusses plans for the future that will enable FAS to support the ATR in inccreasing its responsiveness to the Conduct of Operations Order.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pentz, David L.; Stoll, Ralph H.; Greeves, John T.
2012-07-01
The PRISM (Prioritization Risk Integration Simulation Model), a computer model was developed to support the Department of Energy's Office of Environmental Management (DOE-EM) in its mission to clean up the environmental legacy from the Nation's nuclear weapons materials production complex. PRISM provides a comprehensive, fully integrated planning tool that can tie together DOE-EM's projects. It is designed to help DOE managers develop sound, risk-informed business practices and defend program decisions. It provides a better ability to understand and manage programmatic risks. The underlying concept for PRISM is that DOE-EM 'owns' a portfolio of environmental legacy obligations (ELOs), and that itsmore » mission is to transform the ELOs from their current conditions to acceptable conditions, in the most effective way possible. There are many types of ELOs - - contaminated soils and groundwater plumes, disused facilities awaiting D and D, and various types of wastes waiting for processing or disposal. For a given suite of planned activities, PRISM simulates the outcomes as they play out over time, allowing for all key identified uncertainties and risk factors. Each contaminated building, land area and waste stream is tracked from cradle to grave, and all of the linkages affecting different waste streams are captured. The progression of the activities is fully dynamic, reflecting DOE-EM's prioritization approaches, precedence requirements, available funding, and the consequences of risks and uncertainties. The top level of PRISM is the end-user interface that allows rapid evaluation of alternative scenarios and viewing the results in a variety of useful ways. PRISM is a fully probabilistic model, allowing the user to specify uncertainties in input data (such as the magnitude of an existing groundwater plume, or the total cost to complete a planned activity) as well as specific risk events that might occur. PRISM is based on the GoldSim software that is widely used for risk and performance assessment calculations. PRISM can be run in a deterministic mode, which quickly provides an estimate of the most likely results of a given plan. Alternatively, the model can be run probabilistically in a Monte Carlo mode, exploring the risks and uncertainties in the system and producing probability distributions for the different performance measures. The PRISM model demonstrates how EM can evaluate a portfolio of ELOs, and transform the ELOs from their current conditions to acceptable conditions, utilizing different strategic approaches. There are many types of ELOs - contaminated soils and groundwater plumes, disused facilities awaiting D and D, and various types of wastes waiting for processing or disposal. This scope of work for the PRISM process and the development of a dynamic simulation model are a logical extension of the GoldSim simulation software used by the OCRWM to assess the long-term performance for the Yucca Mountain Project and by NNSA to assess project risk at its sites. Systems integration modeling will promote better understanding of all project risks, technical and nontechnical, and more defensible decision-making for complex projects with significant uncertainties. It can provide effective visual communication and rapid adaptation during interactions with stakeholders (Administration, Congress, State, Local, and NGO). It will also allow rapid assessment of alternative management approaches. (authors)« less
The impact of health plan report cards on managed care enrollment.
Scanlo, Dennis P; Chernew, Michael; Mclaughlin, Catherine; Solon, Gary
2002-01-01
How does the release of health plan performance ratings influence employee health plan choice? A natural experiment at General Motors (GM) Corporation provides valuable evidence on this question. During the 1997 open enrollment period, GM disseminated a health plan report card for the first time. By comparing 1996 and 1997 enrollment patterns, our analysis estimates the impact of the report card information while accounting for fixed, unobserved plan traits. Results indicate that employees are less likely to enroll in plans requiring relatively high out-of-pocket contributions. Results with respect to report card ratings suggest that individuals avoid health plans with many below average ratings.
DOE Office of Scientific and Technical Information (OSTI.GOV)
K. Ladwig; B. Hensel; D. Wallschlager
2005-10-18
Following completion of contracting activities, sites were identified for the field leachate characterization study. Sampling and Analyses Plans (SAPs) and Site Access Agreements (SAAs) were developed for each site. A total of ten sites were sampled during this reporting period. Among the trace constituents, boron, silicon, and strontium were present in highest concentrations, with median values above 1 mg/L (1,000 {micro}g/L). Work on the first of three sites for the detailed arsenic and selenium adsorption studies began in 2002, prior to completion of the final DOE award. Kd values ranged from 100 to 12,000 L/kg for arsenic (V), 15 tomore » 160 L.kg for As(III), and 5 to 25 L/kg for Se(VI).« less
Operation of a Public Geologic Core and Sample Repository in Houstion, Texas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Scott Tinker; Beverly DeJarnett
2007-07-31
The Bureau of Economic Geology's Houston Research Center (HRC) is well established as a premier regional research center for geologic research serving not only Houston, but geoscientists from around Texas, the U. S., and even the world. As reported in the FY05 and FY06 technical progress reports to the DOE, the HRC provides a state-of-the-art core viewing facility, two fully equipped conference rooms, and a comprehensive technical library, all available for public use. In addition, the HRC currently now houses over 725,000 boxes of rock material (as of January 2008), and has space to hold approximately 300,000 more boxes. Use of the facility has remained strong; the number of patrons averaged over 100 per month from June 1, 2006 to October 2007, and 90,000 boxes of core were donated to, and received by, the HRC during this time. Usage is a combination of individuals describing core, groups of geoscientists holding seminars and workshops, and various industry and government-funded groups holding short courses, workshops, and seminars. These numbers are in addition to the numerous daily requests from patrons desiring to have rock material shipped offsite to their own offices. The BEG/HRC secured several substantial donations of rock materials and cash totaling approximatelymore » $2.2 million during the 2005-2006 operating period. All of these funds went directly into an endowment that UT is building in order to operate the HRC primarily off a portion of the interest generated by the fund. Specific details regarding the funds in the endowment are addressed in a table later in this report. Outreach during 2005 and 2006 included many technical presentations and several publications on the HRC. Several field trips to the facility were held for geoscience professionals and grade school students alike. Goals for the upcoming year involve securing a major donation of rock material and cash in order to approach full funding of the HRC endowment. Thanks to donations totaling $2.2 million from Shea Homes (heritage Unocal rock material),Chevron and others this operating year, the HRC endowment now totals $8,015,621. A major project underway for the HRC in FY2007 is improvement of the existing online core/log database into a geoinformatics-compatible, GIS-driven online system. Usage of the HRC has gone up every year and is now very respectable. This year we will strive to raise awareness of the HRC's 100,000-volume geoscience technical library. Our original business model targeted $10 million in endowment; after several years of operation we realize we require an $11 million endowment. We are 'on plan' and need only $$3 million to fully fund the endowment. To meet these goals in the 2007 operating year will require DOE support for the fifth and final year. DOW support will allow for {approx}$$600K in endowment growth and save using the fund for operation; lack of support will result in a net negative spread of up to $1 million, and set the plan way back. We recognize that DOE budgets for oil and gas research, against best efforts, have been cut substantially this year. Any support available for HRC operation, during continuing resolution or otherwise, would have a very positive impact on this critical final year of the original business plan.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schwager, K.; Green, T. M.
The DOE policy for managing wildland fires requires that all areas managed by DOE and/or Its various contractors which can sustain fire must have a FMP that details fire management guidelines for operational procedures associated with wildland fire, operational, and prescribed fires. FMPs provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered, threatened,more » and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL. The plan will be reviewed periodically to ensure fire program advances and will evolve with the missions of DOE and BNL.« less
Code of Federal Regulations, 2014 CFR
2014-10-01
... Administrator, to the extent permitted by law: (1) Uses the state process to determine views of State and local..., as early in a program planning cycle as is reasonably feasible to explain specific plans and actions...
Code of Federal Regulations, 2013 CFR
2013-07-01
... the extent permitted by law: (1) Uses the official state process to determine views of state and local... state process, as early in a program planning cycle as is reasonably feasible to explain specific plans...
Code of Federal Regulations, 2013 CFR
2013-10-01
... Administrator, to the extent permitted by law: (1) Uses the state process to determine views of State and local..., as early in a program planning cycle as is reasonably feasible to explain specific plans and actions...
Code of Federal Regulations, 2011 CFR
2011-07-01
... the extent permitted by law: (1) Uses the official state process to determine views of state and local... state process, as early in a program planning cycle as is reasonably feasible to explain specific plans...
Code of Federal Regulations, 2011 CFR
2011-10-01
... Administrator, to the extent permitted by law: (1) Uses the state process to determine views of State and local..., as early in a program planning cycle as is reasonably feasible to explain specific plans and actions...
Code of Federal Regulations, 2012 CFR
2012-07-01
... the extent permitted by law: (1) Uses the official state process to determine views of state and local... state process, as early in a program planning cycle as is reasonably feasible to explain specific plans...
Code of Federal Regulations, 2014 CFR
2014-07-01
... the extent permitted by law: (1) Uses the official state process to determine views of state and local... state process, as early in a program planning cycle as is reasonably feasible to explain specific plans...
Code of Federal Regulations, 2010 CFR
2010-07-01
... the extent permitted by law: (1) Uses the official state process to determine views of state and local... state process, as early in a program planning cycle as is reasonably feasible to explain specific plans...
Code of Federal Regulations, 2012 CFR
2012-10-01
... Administrator, to the extent permitted by law: (1) Uses the state process to determine views of State and local..., as early in a program planning cycle as is reasonably feasible to explain specific plans and actions...
Code of Federal Regulations, 2010 CFR
2010-10-01
... Administrator, to the extent permitted by law: (1) Uses the state process to determine views of State and local..., as early in a program planning cycle as is reasonably feasible to explain specific plans and actions...
Developing a web-based forecasting tool for nutrient management
USDA-ARS?s Scientific Manuscript database
Modern nutrient management planning tools provide strategic guidance that, in the best cases, educates farmers and others involved in nutrient management to make prudent management decisions. The strategic guidance provided by nutrient management plans does not provide the day-to-day support require...
42 CFR 440.390 - Assurance of transportation.
Code of Federal Regulations, 2014 CFR
2014-10-01
...-Equivalent Coverage § 440.390 Assurance of transportation. If a benchmark or benchmark-equivalent plan does... nevertheless assure that emergency and non-emergency transportation is covered for beneficiaries enrolled in the benchmark or benchmark-equivalent plan, as required under § 431.53 of this chapter. ...
42 CFR 440.390 - Assurance of transportation.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-Equivalent Coverage § 440.390 Assurance of transportation. If a benchmark or benchmark-equivalent plan does... nevertheless assure that emergency and non-emergency transportation is covered for beneficiaries enrolled in the benchmark or benchmark-equivalent plan, as required under § 431.53 of this chapter. ...
42 CFR 440.390 - Assurance of transportation.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-Equivalent Coverage § 440.390 Assurance of transportation. If a benchmark or benchmark-equivalent plan does... nevertheless assure that emergency and non-emergency transportation is covered for beneficiaries enrolled in the benchmark or benchmark-equivalent plan, as required under § 431.53 of this chapter. ...
42 CFR 440.390 - Assurance of transportation.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-Equivalent Coverage § 440.390 Assurance of transportation. If a benchmark or benchmark-equivalent plan does... nevertheless assure that emergency and non-emergency transportation is covered for beneficiaries enrolled in the benchmark or benchmark-equivalent plan, as required under § 431.53 of this chapter. ...
42 CFR 440.390 - Assurance of transportation.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-Equivalent Coverage § 440.390 Assurance of transportation. If a benchmark or benchmark-equivalent plan does... nevertheless assure that emergency and non-emergency transportation is covered for beneficiaries enrolled in the benchmark or benchmark-equivalent plan, as required under § 431.53 of this chapter. ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Erhart, Steven C.; Spencer, Charles G.
The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the U.S. Department of Energy (DOE) and the National Nuclear Security Administration (NNSA) vision for a commitment to energy effi ciency and sustainability and to achievement of the Guiding Principles. Specifi cally, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan (SSPP), while promoting overall sustainability and reduction of greenhouse gas (GHG) emissions. The mission of the Y-12 Energy Management program is to incorporate energy-efficient technologies site-wide and to position Y-12more » to meet NNSA energy requirement needs through 2025 and beyond. This plan addresses: Greenhouse Gas Reduction and Comprehensive Greenhouse Gas Inventory; Buildings, ESPC Initiative Schedule, and Regional and Local Planning; Fleet Management; Water Use Efficiency and Management; Pollution Prevention and Waste Reduction; Sustainable Acquisition; Electronic Stewardship and Data Centers; Renewable Energy; Climate Change; and Budget and Funding.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1999-07-15
The U.S. Department of Energy (DOE) and the U.S. Department of the Army (DA) are conducting cleanup activities at two properties--the DOE chemical plant area and the DA ordnance works area (the latter includes the training area)--located in the Weldon Spring area in St. Charles County, Missouri. These areas are on the National Priorities List (NPL), and cleanup activities at both areas are conducted in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA), as amended. DOE and DA are conducting a joint remedial investigation (RI) and baseline risk assessment (BRA) as part of the remedial investigation/feasibility studymore » (RI/FS) for the groundwater operable units for the two areas. This joint effort will optimize further data collection and interpretation efforts and facilitate overall remedial decision making since the aquifer of concern is common to both areas. A Work Plan issued jointly in 1995 by DOE and the DA discusses the results of investigations completed at the time of preparation of the report. The investigations were necessary to provide an understanding of the groundwater system beneath the chemical plant area and the ordnance works area. The Work Plan also identifies additional data requirements for verification of the evaluation presented.« less
26 CFR 1.401(a)-1 - Post-ERISA qualified plans and qualified trusts; in general.
Code of Federal Regulations, 2010 CFR
2010-04-01
... of normal retirement age (subject to paragraph (b)(2) of this section). A plan does not fail to...), that a distribution may be made from the plan to an employee who has attained age 62 and who is not separated from employment at the time of such distribution. (ii) Section 1.401-1(b)(1)(i), a pre-ERISA...
Code of Federal Regulations, 2010 CFR
2010-10-01
... network requirement in § 403.806(f)(3) if its pharmacy network is not limited to mail-order pharmacies and is equivalent to the pharmacy network used in its Medicare managed care plan and such pharmacy network has been approved by the Secretary, or, if its Medicare managed care plan does not use a pharmacy...
ERIC Educational Resources Information Center
Carr, Deborah
2012-01-01
Purpose of the Study: I examine whether 5 aspects of a significant other's death quality (pain, decision-making capacity, location, problems with end-of life care, and preparation) affect whether one does advance care planning (ACP). I also identify specific aspects of others' deaths that respondents say triggered their own planning. Design and…
Code of Federal Regulations, 2010 CFR
2010-04-01
...: FMLA does not require an employer to maintain an employee's non-health benefits (e.g., life insurance...: May an employee revoke coverage or cease payment of his or her share of group health plan premiums... returns to work. FMLA also provides the employee a right to be reinstated in the group health plan...
Code of Federal Regulations, 2010 CFR
2010-04-01
... stock to employee stock ownership plans or certain cooperatives (temporary). 1.1042-1T Section 1.1042-1T...) INCOME TAXES Common Nontaxable Exchanges § 1.1042-1T Questions and answers relating to the sales of stock to employee stock ownership plans or certain cooperatives (temporary). Q-1: What does section 1042...
1989-09-01
projections of planned construction, overhaul and repair work from both the public and commercial sectors can never sustain the industry at a level which...and other government organizations to support the Shipyard Recovery Plan and the revitalization of commercial shipbuilding in America. Expanding...engineer sitting next to the organization that does work package planning on ships and from the fleet. It won’t be, at least in these competitive firms
Handbook: Collecting Groundwater Samples from Monitoring Wells in Frenchman Flat, CAU 98
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chapman, Jenny; Lyles, Brad; Cooper, Clay
Frenchman Flat basin on the Nevada National Security Site (NNSS) contains Corrective Action Unit (CAU) 98, which is comprised of ten underground nuclear test locations. Environmental management of these test locations is part of the Underground Test Area (UGTA) Activity conducted by the U.S. Department of Energy (DOE) under the Federal Facility Agreement and Consent Order (FFACO) (1996, as amended) with the U.S. Department of Defense (DOD) and the State of Nevada. A Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) has been approved for CAU 98 (DOE, 2011). The CADD/CAP reports on the Corrective Action Investigation that was conductedmore » for the CAU, which included characterization and modeling. It also presents the recommended corrective actions to address the objective of protecting human health and the environment. The recommended corrective action alternative is “Closure in Place with Modeling, Monitoring, and Institutional Controls.” The role of monitoring is to verify that Contaminants of Concern (COCs) have not exceeded the Safe Drinking Water Act (SDWA) limits (Code of Federal Regulations, 2014) at the regulatory boundary, to ensure that institutional controls are adequate, and to monitor for changed conditions that could affect the closure conditions. The long-term closure monitoring program will be planned and implemented as part of the Closure Report stage after activities specified in the CADD/CAP are complete. Groundwater at the NNSS has been monitored for decades through a variety of programs. Current activities were recently consolidated in an NNSS Integrated Sampling Plan (DOE, 2014). Although monitoring directed by the plan is not intended to meet the FFACO long-term monitoring requirements for a CAU (which will be defined in the Closure Report), the objective to ensure public health protection is similar. It is expected that data collected in accordance with the plan will support the transition to long-term monitoring at each CAU. The sampling plan is designed to ensure that monitoring activities occur in compliance with the UGTA Quality Assurance Plan (DOE, 2012). The sampling plan should be referenced for Quality Assurance (QA) elements and procedures governing sampling activities. The NNSS Integrated Sampling Plan specifies the groundwater monitoring that will occur in CAU 98 until the long-term monitoring program is approved in the Closure Report. The plan specifies the wells that must be monitored and categorizes them by their sampling objective with the associated analytical requirements and frequency. Possible sample collection methods and required standard operating procedures are also presented. The intent of this handbook is to augment the NNSS Integrated Sampling Plan by providing well-specific details for the sampling professional implementing the Sampling Plan in CAU 98, Frenchman Flat. This handbook includes each CAU 98 well designated for sampling in the NNSS Integrated Sampling Plan. The following information is provided in the individual well sections: 1. The purpose of sampling. 2. A physical description of the well. 3. The chemical characteristics of the formation water. 4. Recommended protocols for purging and sampling. The well-specific information has been gathered from numerous historical and current sources cited in each section, but two particularly valuable resources merit special mention. These are the USGS NNSS website (http://nevada.usgs.gov/doe_nv/ntsarea5.cfm) and the UGTA Field Operations website (https://ugta.nv.doe.gov/sites/Field%20Operations/default.aspx). 2 Land surface elevation and measuring point for water level measurements in Frenchman Flat were a focus during CAU investigations (see Appendix B, Attachment 1 in Navarro-Intera, 2014). Both websites listed above provide information on the accepted datum for each well. A summary is found on the home page for the well on the USGS website. Additional information is available through a link in the “Available Data” section to an “MP diagram” with a photo annotated with the datum information. On the UGTA Field Operations well page, the same information is in the “Wellhead Diagram” link. Well RNM-2s does not have an annotated photo at this time. All of the CAU 98 monitoring wells are located within Area 5 of Frenchman Flat, with the exception of ER-11-2 in Area 11 (Figure 1). The wells are clustered in two areas: the northern area (Figure 2) and the central area (Figure 3). Each well is discussed below in geographic order from north to south as follows: ER-11-2, ER-5-3 shallow piezometer, ER-5-3-2, ER-5-5, RNM-1, RNM-2s, and UE-5n.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
ENVIRONMENTAL AND WASTE MANAGEMENT SERVICES DIVISION
This Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) and the Upton Ecological and Research Reserve (Upton Reserve) is based on the U.S. Fish & Wildlife Service (FWS) fire management planning procedures and was developed in cooperation with the Department of Energy (DOE) by Brookhaven Science Associates. As the Upton Reserve is contained within the BNL 5,265-acre site, it is logical that the plan applies to both the Upton Reserve and BNL. The Department of the Interior policy for managing wildland fires requires that all areas managed by FWS that can sustain fire must have an FMP thatmore » details fire management guidelines for operational procedures and specifies values to be protected or enhanced. Fire management plans provide guidance on fire preparedness, fire prevention, wildfire suppression, and the use of controlled, ''prescribed'' fires and mechanical means to control the amount of available combustible material. Values reflected in the BNL/Upton Reserve Wildland FMP include protecting life and public safety; Lab properties, structures and improvements; cultural and historical sites; neighboring private and public properties; and endangered and threatened species and species of concern. Other values supported by the plan include the enhancement of fire-dependent ecosystems at BNL and the Upton Reserve. This FMP will be reviewed periodically to ensure the fire program advances and evolves with the missions of FWS, BNL, and the Upton Reserve. This Fire Management Plan is a modified version of the Long Island National Wildlife Refuge Complex Fire plan (updated in 2000), which contains all FWS fire plan requirements and is presented in the format specified by the national template for fire management plans adopted under the National Fire Plan. The DOE is one of the signatory agencies on the National Fire Plan. FWS shall be, through an Interagency Agreement dated November 2000 (Appendix C), responsible for coordinating and implementing prescribed burns and fuel reduction projects in the Upton Reserve. Prescribed fire and fuel reduction in locations outside the Upton Reserve will be coordinated through the Natural Resource Management Program at BNL, and done in consultation with FWS. This FMP is to be used and implemented for the entire BNL site including the Upton Reserve and has been reviewed by FWS, The Nature Conservancy, New York State Department of Environmental Conservation Forest Rangers, and DOE, as well as appropriate BNL emergency services personnel.« less
Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-11-01
This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Act on (UMTRA) Project Bodo Canyon disposal site at Durango, Colorado, describes the surveillance activities for the disposal site. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal call continues to function as designed This LTSP was prepared as a requirement for DOE acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM) from processing uranium ore. This LTSP documents that the land and interests are owned by the United States andmore » details how long-term care of the disposal site will be carried out. It is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a). Following the introduction, contents of this report include the following: site final condition; site drawings and photographs; permanent site surveillance features; ground water monitoring; annual site inspections; unscheduled inspections; custodial maintenance; corrective action; record keeping and reporting requirements; emergency notification and reporting; quality assurance; personal health and safety; list of contributions; and references.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-12-01
The uranium mill tailings site near Durango, Colorado, was one of 24 inactive uranium mill sites designated to be remediated by the US Department of Energy (DOE) under the Uranium Mill Tailings Radiation Control Act of 1978 (UMTRCA). Part of the UMTRCA requires that the US Nuclear Regulatory Commission (NRC) concur with the DOE's Remedial Action Plan (RAP) and certify that the remedial action conducted at the site complies with the standards promulgated by the US Environmental Protection Agency (EPA). Included in the RAP is this Remedial Action Selection Report (RAS), which has been developed to serve a two-fold purpose.more » First, it describes the activities that have been conducted by the DOE to accomplish remediation and long-term stabilization and control of the radioactive materials at the inactive uranium mill processing site near Durango, Colorado. Secondly, this document and the rest of the RAP, upon concurrence and execution by the DOE, the State of Colorado, and the NRC, become Appendix B of the Cooperative Agreement between the DOE and the State of Colorado.« less
48 CFR 919.7006 - Incentives for DOE contractor participation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... ENERGY SOCIOECONOMIC PROGRAMS SMALL BUSINESS PROGRAMS The Department of Energy Mentor-Protege Program 919... Mentor firms may earn award fees associated with their performance as a Mentor. The award fee plan may... Mentor's performance in the DOE Mentor-Protege Program under any Mentor-Protege Agreement(s) as a...
5 CFR 892.102 - What is premium conversion and how does it work?
Code of Federal Regulations, 2013 CFR
2013-01-01
... 5 Administrative Personnel 2 2013-01-01 2013-01-01 false What is premium conversion and how does it work? 892.102 Section 892.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL FLEXIBLE BENEFITS PLAN: PRE-TAX PAYMENT OF HEALTH BENEFITS...
5 CFR 892.102 - What is premium conversion and how does it work?
Code of Federal Regulations, 2011 CFR
2011-01-01
... 5 Administrative Personnel 2 2011-01-01 2011-01-01 false What is premium conversion and how does it work? 892.102 Section 892.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL FLEXIBLE BENEFITS PLAN: PRE-TAX PAYMENT OF HEALTH BENEFITS...
5 CFR 892.102 - What is premium conversion and how does it work?
Code of Federal Regulations, 2014 CFR
2014-01-01
... 5 Administrative Personnel 2 2014-01-01 2014-01-01 false What is premium conversion and how does it work? 892.102 Section 892.102 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL FLEXIBLE BENEFITS PLAN: PRE-TAX PAYMENT OF HEALTH BENEFITS...
Paying Faculty Members What They Are Worth.
ERIC Educational Resources Information Center
Breslin, Richard D.; Klagholz, Leo F.
1980-01-01
Faculty members at New Jersey's state colleges have begun working under a plan that provides salary increases for meritorious performance. Such merit compensation does not conflict with faculty promotion, nor is it intended to replace cost-of-living increases. However, it does replace government-style guaranteed automatic raises that encourage…
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 18 2013-07-01 2013-07-01 false Puerto Rico. 81.355 Section 81.355... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.355 Puerto Rico. Puerto Rico—SO2 Designated area Does not meet primary standards Does not meet secondary standards Cannot...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 18 2012-07-01 2012-07-01 false Puerto Rico. 81.355 Section 81.355... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.355 Puerto Rico. Puerto Rico—SO2 Designated area Does not meet primary standards Does not meet secondary standards Cannot...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 17 2011-07-01 2011-07-01 false Puerto Rico. 81.355 Section 81.355... AREAS FOR AIR QUALITY PLANNING PURPOSES Section 107 Attainment Status Designations § 81.355 Puerto Rico. Puerto Rico—SO2 Designated area Does not meet primary standards Does not meet secondary standards Cannot...