Sample records for transit system planned

  1. Iowa in motion : transit system plan : implementing Iowa's state transportation plan

    DOT National Transportation Integrated Search

    1999-09-14

    The Iowa Transit System Plan was developed as a result of the on-going long-range transportation planning process known as Iowa In Motion This planning document, the 1999 Iowa Transit System Plan, is the result of this continuing planning process and...

  2. USDOT Integrated Corridor Management (ICM) Initiative Transit Data Gaps for Rail Transit Systems Initial Planning Workshop Notes

    DOT National Transportation Integrated Search

    2008-06-23

    This document presents the notes taken at the USDOT Integrated Corridor Management (ICM) Transit Data Gaps for Rail Transit Systems Initial Planning Workshop. Different scenarios for handling increased demand on rail and bus transit systems are discu...

  3. Concept for a Satellite-Based Advanced Air Traffic Management System : Volume 6. Development and Transition Plans.

    DOT National Transportation Integrated Search

    1974-02-01

    The volume presents the plans for implementing the Satellite-Based Advanced Air Traffic Management System (SAATMS) described in Volumes II, III, and IV. Two plans are presented: an RDT&E plan and a transition plan. The RDT&E plan is presented as a se...

  4. 36 CFR 219.35 - Transition.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 219.35 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PLANNING National Forest System Land and Resource Management Planning Applicability and Transition § 219.35 Transition. (a.... (b) Until the Department promulgates superseding planning regulations pursuant to the National Forest...

  5. Improving TOGAF ADM 9.1 Migration Planning Phase by ITIL V3 Service Transition

    NASA Astrophysics Data System (ADS)

    Hanum Harani, Nisa; Akhmad Arman, Arry; Maulana Awangga, Rolly

    2018-04-01

    Modification planning of business transformation involving technological utilization required a system of transition and migration planning process. Planning of system migration activity is the most important. The migration process is including complex elements such as business re-engineering, transition scheme mapping, data transformation, application development, individual involvement by computer and trial interaction. TOGAF ADM is the framework and method of enterprise architecture implementation. TOGAF ADM provides a manual refer to the architecture and migration planning. The planning includes an implementation solution, in this case, IT solution, but when the solution becomes an IT operational planning, TOGAF could not handle it. This paper presents a new model framework detail transitions process of integration between TOGAF and ITIL. We evaluated our models in field study inside a private university.

  6. 47 CFR 101.4 - Transition plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 47 Telecommunication 5 2010-10-01 2010-10-01 false Transition plan. 101.4 Section 101.4 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.4 Transition plan. (a) All systems...

  7. 47 CFR 101.4 - Transition plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 5 2011-10-01 2011-10-01 false Transition plan. 101.4 Section 101.4 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.4 Transition plan. (a) All systems...

  8. 47 CFR 101.4 - Transition plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Transition plan. 101.4 Section 101.4 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.4 Transition plan. (a) All systems...

  9. 47 CFR 101.4 - Transition plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 5 2012-10-01 2012-10-01 false Transition plan. 101.4 Section 101.4 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.4 Transition plan. (a) All systems...

  10. 47 CFR 101.4 - Transition plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Transition plan. 101.4 Section 101.4 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES Applications and Licenses General Filing Requirements § 101.4 Transition plan. (a) All systems...

  11. Planning for Bike Share Connectivity to Rail Transit

    PubMed Central

    Griffin, Greg Phillip; Sener, Ipek Nese

    2016-01-01

    Bike sharing can play a role in providing access to transit stations and then to final destinations, but early implementation of these systems in North America has been opportunistic rather than strategic. This study evaluates local intermodal plan goals using trip data and associated infrastructure such as transit stops and bike share station locations in Austin, Texas, and Chicago, Illinois. Bike sharing use data from both cities suggest a weak relationship with existing rail stations that could be strengthened through collaborative, intermodal planning. The study suggests a planning framework and example language that could be tailored to help address the linkage between bike sharing and transit. Rather than an exhaustive study of the practice, this study provides evidence from these two cities that identify opportunities to improve intermodal planning. Cities that are planning or expanding a bike sharing system should consider carefully how to leverage this mode with existing modes of transport. Regardless of a city’s status in implementing a bike sharing system, planners can leverage information on existing transport systems for planning at regional and local levels. PMID:27872554

  12. GIS as a Sketch-Plan Tool to Replace Traditional Transit Route Planning Practice for College and University Communities

    ERIC Educational Resources Information Center

    Chaudhari, Jaydeep; Ye, Zhirui

    2010-01-01

    Auburn University--a prominent land-grant and comprehensive research institute in Alabama--is no exception to the need to grapple with transportation planning. Auburn launched its transit system (called "Tiger Transit") in 1997 to address the needs of student commuters and a shrinking parking supply. However, by 2007 Tiger Transit faced…

  13. Transit Security Procedures Guide

    DOT National Transportation Integrated Search

    1994-12-01

    To protect passenger, employees, revenue, and property, transit systems are encouraged to take a proactive, prevention-oriented systems approach to transit security. This guide is a compilation of materials for planning and improving transit security...

  14. Minnesota urban partnership agreement national evaluation : transit system data test plan.

    DOT National Transportation Integrated Search

    2009-11-17

    This report presents the test plan for collecting and analyzing transit system data for the Minnesota Urban Partnership Agreement (UPA) National Evaluation under the United States Department of Transportation (U.S. DOT) UPA Program. The Minnesota UPA...

  15. 49 CFR 659.23 - System security plan: contents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false System security plan: contents. 659.23 Section 659... State Oversight Agency § 659.23 System security plan: contents. The system security plan must, at a... system security plan; and (e) Document the rail transit agency's process for making its system security...

  16. San Francisco urban partnership agreement, national evaluation : transit system data test plan.

    DOT National Transportation Integrated Search

    2011-06-01

    This report presents the test plan for collecting and analyzing the transit system data for the San Francisco Urban Partnership Agreement (UPA) under the United States Department of Transportation (U.S. DOT) UPA Program. The San Francisco UPA project...

  17. 49 CFR 659.25 - Annual review of system safety program plan and system security plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... system security plan. 659.25 Section 659.25 Transportation Other Regulations Relating to Transportation... and system security plan. (a) The oversight agency shall require the rail transit agency to conduct an annual review of its system safety program plan and system security plan. (b) In the event the rail...

  18. Improving Collaborative School-Agency Transition Planning: A Statewide DBMS Approach.

    ERIC Educational Resources Information Center

    Peterson, Randolph L.; Roessler, Richard T.

    1997-01-01

    Describes the development and components of a referral database management system developed by the Arkansas Transition Project. The system enables individualized-education-plan team members to refer students with disabilities directly to adult agencies and to receive a monitoring report describing the agency response to the referral. The system is…

  19. Systems Analysis of Rapid Transit Underground Construction : Volume 1. Sections 1-5.

    DOT National Transportation Integrated Search

    1974-12-01

    This study describes rapid transit system implementation, design, and construction procedures. The relationships and responsibilities of governmental, private, and public groups involved in planning and implementing an urban rapid transit system are ...

  20. Customized sampling plans : a guide to alternative sampling techniques for National Transit Database reporting

    DOT National Transportation Integrated Search

    2004-05-01

    For estimating the system total unlinked passenger trips and passenger miles of a fixed-route bus system for the National Transit Database (NTD), the FTA approved sampling plans may either over-sample or do not yield FTAs required confidence and p...

  1. Documentation of a Collaborative Transition Planning System: A Curriculum Planning Guide for Students with Mild Disabilities.

    ERIC Educational Resources Information Center

    Jackson, Jeanne

    This report describes and analyzes the transition process used at Savanna High School, Anaheim, California, and documents the unique contribution of the school's Independent Living Skills Transition Center. The report's seven sections focus on: (1) transition definitions and the need for a shared definition among agency personnel; (2) team…

  2. Financial Management for Transit: A Handbook.

    ERIC Educational Resources Information Center

    Heaselden, Mark; And Others

    This handbook is primarily intended to serve as a primer for transit system managers who have not had any formal financial education through college classes, professional development programs, or extensive on-the-job programs. The following topics are covered: financial planning techniques for transit (beginning the financial planning process,…

  3. Planning for Obsolescence.

    ERIC Educational Resources Information Center

    Malinconico, S. Michael

    1984-01-01

    Discusses planning for the implementation of a high technology system which includes plans for how it will be phased out and an orderly transition made to its successor. System life expectations, user pressures, software modifications, commercial vendors, integrated systems, eroding economies, and replacement planning are highlighted. (EJS)

  4. 49 CFR 659.21 - System security plan: general requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false System security plan: general requirements. 659.21... State Oversight Agency § 659.21 System security plan: general requirements. (a) The oversight agency shall require the rail transit agency to implement a system security plan that, at a minimum, complies...

  5. Individual versus interprofessional team performance in formulating care transition plans: A randomised study of trainees from five professional groups.

    PubMed

    Farrell, Timothy W; Supiano, Katherine P; Wong, Bob; Luptak, Marilyn K; Luther, Brenda; Andersen, Troy C; Wilson, Rebecca; Wilby, Frances; Yang, Rumei; Pepper, Ginette A; Brunker, Cherie P

    2018-05-01

    Health professions trainees' performance in teams is rarely evaluated, but increasingly important as the healthcare delivery systems in which they will practice move towards team-based care. Effective management of care transitions is an important aspect of interprofessional teamwork. This mixed-methods study used a crossover design to randomise health professions trainees to work as individuals and as teams to formulate written care transition plans. Experienced external raters assessed the quality of the written care transition plans as well as both the quality of team process and overall team performance. Written care transition plan quality did not vary between individuals and teams (21.8 vs. 24.4, respectively, p = 0.42). The quality of team process did not correlate with the quality of the team-generated written care transition plans (r = -0.172, p = 0.659). However, there was a significant correlation between the quality of team process and overall team performance (r = 0.692, p = 0.039). Teams with highly engaged recorders, performing an internal team debrief, had higher-quality care transition plans. These results suggest that high-quality interprofessional care transition plans may require advance instruction as well as teamwork in finalising the plan.

  6. Planning the data transition of a VLDB: a case study

    NASA Astrophysics Data System (ADS)

    Finken, Shirley J.

    1997-02-01

    This paper describes the technical and programmatic plans for moving and checking certain data from the IDentification Automated Services (IDAS) system to the new Interstate Identification Index/Federal Bureau of Investigation (III/FBI) Segment database--one of the three components of the Integrated Automated Fingerprint Identification System (IAFIS) being developed by the Federal Bureau of Investigation, Criminal Justice Information Services Division. Transitioning IDAS to III/FBI includes putting the data into an entirely new target database structure (i.e. from IBM VSAM files to ORACLE7 RDBMS tables). Only four IDAS files were transitioned (CCN, CCR, CCA, and CRS), but their total estimated size is at 500 Gb of data. Transitioning of this Very Large Database is planned as two processes.

  7. Potential Greenhouse Gas Emissions Reductions from Optimizing Urban Transit Networks

    DOT National Transportation Integrated Search

    2016-05-01

    Public transit systems with efficient designs and operating plans can reduce greenhouse gas (GHG) emissions relative to low-occupancy transportation modes, but many current transit systems have not been designed to reduce environmental impacts. This ...

  8. NASA metric transition plan

    NASA Technical Reports Server (NTRS)

    1992-01-01

    NASA science publications have used the metric system of measurement since 1970. Although NASA has maintained a metric use policy since 1979, practical constraints have restricted actual use of metric units. In 1988, an amendment to the Metric Conversion Act of 1975 required the Federal Government to adopt the metric system except where impractical. In response to Public Law 100-418 and Executive Order 12770, NASA revised its metric use policy and developed this Metric Transition Plan. NASA's goal is to use the metric system for program development and functional support activities to the greatest practical extent by the end of 1995. The introduction of the metric system into new flight programs will determine the pace of the metric transition. Transition of institutional capabilities and support functions will be phased to enable use of the metric system in flight program development and operations. Externally oriented elements of this plan will introduce and actively support use of the metric system in education, public information, and small business programs. The plan also establishes a procedure for evaluating and approving waivers and exceptions to the required use of the metric system for new programs. Coordination with other Federal agencies and departments (through the Interagency Council on Metric Policy) and industry (directly and through professional societies and interest groups) will identify sources of external support and minimize duplication of effort.

  9. Planning and Measurement in School to Work Transition.

    ERIC Educational Resources Information Center

    Kooi, Beverly Y.

    An analysis, development, and research (ADR) approach for planning educational research and development programs was used as a model for planning the National Institute of Education's School-To-Work Transition Program. The ADR model is system oriented and utilizes an iterative approach in which research questions are raised as others are answered.…

  10. 49 CFR 611.7 - Relation to planning and project development processes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (ii) Two years after the project opens for revenue service, the grantee shall collect the “after” data... the project. (i) The plan shall provide for: Collection of “before” data on the current transit system... project; collection of “after” data on the transit system two years after opening of the new start project...

  11. The Transition from VMS to Unix Operations for STScI's Science Planning and Scheduling Team

    NASA Astrophysics Data System (ADS)

    Adler, D. S.; Taylor, D. K.

    The Science Planning and Scheduling Team of the Space Telescope Science Institute currently uses the VMS operating system. SPST began a transition to Unix-based operations in the summer of 1999. The main tasks for SPST to address in the Unix transition are: (1) converting the current SPST operational tools from DCL to Python; (2) converting our database report scripts from SQL; (3) adopting a Unix-based code management system; and (4) training the SPST staff. The goal is to fully transition the team to Unix operations by the end of 2001.

  12. General Vehicle Test Plan (GVTP) for Urban Rail Transit Cars

    DOT National Transportation Integrated Search

    1977-09-01

    The General Vehicle Test Plan provides a system for general vehicle testing and for documenting and utilizing data and information in the testing of urban rail transit cars. Test procedures are defined for nine categories: (1) Performance; (2) Power ...

  13. Enriching mission planning approach with state transition graph heuristics for deep space exploration

    NASA Astrophysics Data System (ADS)

    Jin, Hao; Xu, Rui; Xu, Wenming; Cui, Pingyuan; Zhu, Shengying

    2017-10-01

    As to support the mission of Mars exploration in China, automated mission planning is required to enhance security and robustness of deep space probe. Deep space mission planning requires modeling of complex operations constraints and focus on the temporal state transitions of involved subsystems. Also, state transitions are ubiquitous in physical systems, but have been elusive for knowledge description. We introduce a modeling approach to cope with these difficulties that takes state transitions into consideration. The key technique we build on is the notion of extended states and state transition graphs. Furthermore, a heuristics that based on state transition graphs is proposed to avoid redundant work. Finally, we run comprehensive experiments on selected domains and our techniques present an excellent performance.

  14. Assessing the comparative efficiency of urban mass transit systems in Ohio : longitudinal analysis.

    DOT National Transportation Integrated Search

    2013-12-01

    A mass transit system not only improves passenger mobility, it also affects the level of economic activities (e.g., working and shopping). Thus, changes wrought by mass transit service planning can heavily influence regional economic growth. This pla...

  15. An Ecological Approach to Seeking and Utilising the Views of Young People with Intellectual Disabilities in Transition Planning

    ERIC Educational Resources Information Center

    Small, Neil; Raghavan, Raghu; Pawson, Nicole

    2013-01-01

    Transition planning using a person-centred approach has, in the main, failed to shape service provision. We offer an alternative based on an ecological understanding of human development linked to public health approaches that prioritise whole system planning. A total of 43 young people with intellectual disabilities, in Bradford, England, who…

  16. 41 CFR 101-4.230 - Transition plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Transition plans. 101-4.230 Section 101-4.230 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4-NONDISCRIMINATION ON THE BASIS OF SEX IN...

  17. An ecological approach to seeking and utilising the views of young people with intellectual disabilities in transition planning.

    PubMed

    Small, Neil; Raghavan, Raghu; Pawson, Nicole

    2013-12-01

    Transition planning using a person-centred approach has, in the main, failed to shape service provision. We offer an alternative based on an ecological understanding of human development linked to public health approaches that prioritise whole system planning. A total of 43 young people with intellectual disabilities, in Bradford, England, who were approaching transition from school or college were recruited to a qualitative study. Their ethnic breakdown was as follows: 16 white British, 24 Pakistani, 2 Bangladeshi and 1 Black African. Each young person was interviewed twice, at recruitment and a year later, to observe any changes in their social networks during transition. Interviews were undertaken with a semi-structured interview schedule and with the pictorial approach of Talking Mats. Both the networks the young people live within, and their sense of what the future might hold for them, are described and linked to Bronfenbrenner's ecological model of human development. The importance of the family and school is emphasised, as is the absence of engagement in leisure activities and work. Transition planning needs to start with mapping the systems individuals live within, areas of strength should be supported and parts of the system, which are not fit for purpose for these young people, should be prioritised for interventions.

  18. Highway planning and operations for the Dallas district : freeway system plan methodology : summary

    DOT National Transportation Integrated Search

    1997-11-01

    The System Planning Methodology was developed jointly by the Texas Department of Transportation (TxDOT), North Central Texas Council of Governments (NCTCOG), Dallas Area Rapid Transit (DART), and Texas Transportation Institute (TTI) as a transportati...

  19. Knowledge-based treatment planning and its potential role in the transition between treatment planning systems.

    PubMed

    Masi, Kathryn; Archer, Paul; Jackson, William; Sun, Yilun; Schipper, Matthew; Hamstra, Daniel; Matuszak, Martha

    2017-11-22

    Commissioning a new treatment planning system (TPS) involves many time-consuming tasks. We investigated the role that knowledge-based planning (KBP) can play in aiding a clinic's transition to a new TPS. Sixty clinically treated prostate/prostate bed intensity-modulated radiation therapy (IMRT) plans were exported from an in-house TPS and were used to create a KBP model in a newly implemented commercial application. To determine the benefit that KBP may have in a TPS transition, the model was tested on 2 groups of patients. Group 1 consisted of the first 10 prostate/prostate bed patients treated in the commercial TPS after the transition from the in-house TPS. Group 2 consisted of 10 patients planned in the commercial TPS after 8 months of clinical use. The KBP-generated plan was compared with the clinically used plan in terms of plan quality (ability to meet planning objectives and overall dose metrics) and planning efficiency (time required to generate clinically acceptable plans). The KBP-generated plans provided a significantly improved target coverage (p = 0.01) compared with the clinically used plans for Group 1, but yielded plans of comparable target coverage to the clinically used plans for Group 2. For the organs at risk, the KBP-generated plans produced lower doses, on average, for every normal-tissue objective except for the maximum dose to 0.1 cc of rectum. The time needed for the KBP-generated plans ranged from 6 to 15 minutes compared to 30 to 150 and 15 to 60 minutes for manual planning in Groups 1 and 2, respectively. KBP is a promising tool to aid in the transition to a new TPS. Our study indicates that high-quality treatment plans could have been generated in the newly implemented TPS more efficiently compared with not using KBP. Even after 8 months of the clinical use, KBP still showed an increase in plan quality and planning efficiency compared with manual planning. Copyright © 2017 American Association of Medical Dosimetrists. Published by Elsevier Inc. All rights reserved.

  20. Evaluation Plan for the Cape Cod Advanced Public Transportation System

    DOT National Transportation Integrated Search

    2000-06-01

    The Cape Cod Regional Transit Authority (CCRTA) Advanced Public Transportation System (APTS) project is an application of Intelligent Transportation Systems (ITS) to fixed route and paratransit operations in a rural transit setting. The purpose of th...

  1. Mass transit : many management successes at WMATA, but capital planning could be enhanced

    DOT National Transportation Integrated Search

    2001-07-01

    In recent years, the Washington Metropolitan Area Transit Authority's (WMATA) public transit system has experienced problems related to the safety and reliability of its transit services, including equipment breakdowns, delays in scheduled service, u...

  2. Begin the Between: Planning for the Transition from High School to Adult Life for Youth with Developmental Disabilities. Second Edition.

    ERIC Educational Resources Information Center

    Matuszak, Trish; And Others

    This guide was developed to provide an overview of the major elements of the transition planning process from school to the adult system of supports and services for youth with developmental disabilities and their families. The workbook format is intended to enable families to be proactive at each stage of the planning process. Initial sections…

  3. Agile Port System Transition Support Transition Plan Development

    DTIC Science & Technology

    2013-07-29

    Operational Needs addressed • Proposed Solutions • Current Status • Risk • A Business Case for transition • Appropriate Funding Sources • Transition...13  3.1.6  Risk  Table...18  3.2.6  Risk  Table

  4. Final evaluation plan : Utah Transit Authority Connection Protection system

    DOT National Transportation Integrated Search

    2003-08-27

    Utah Transit Authority (UTA) implemented a Connection Protection system (CP) to improve the reliability of transfers from the higher frequency light rail trains, TRAX, to the lower frequency bus services. The CP system examines the status of TRAX tra...

  5. 41 CFR 101-4.225 - Educational institutions eligible to submit transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Educational institutions eligible to submit transition plans. 101-4.225 Section 101-4.225 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4...

  6. Poland's Transition in Business Education

    ERIC Educational Resources Information Center

    Leven, Bozena

    2010-01-01

    Prior to Poland's transition from central planning to a market system, which began in 1990, schools of business were non-existent in that country. Instead, university level instruction on economics during the socialist period was closely tied to ideological priorities, and limited to imparting skills suitable for planned economy. All universities…

  7. 41 CFR 101-4.225 - Educational institutions eligible to submit transition plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 41 Public Contracts and Property Management 2 2011-07-01 2007-07-01 true Educational institutions eligible to submit transition plans. 101-4.225 Section 101-4.225 Public Contracts and Property Management Federal Property Management Regulations System FEDERAL PROPERTY MANAGEMENT REGULATIONS GENERAL 4...

  8. Recommended emergency preparedness guidelines for elderly and disabled rail-transit passengers. Final report, November 1987-March 1989

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hathaway, W.T.; Markos, S.H.; Balog, J.N.

    1989-08-01

    Rail transit has become an important source of transportation for many elderly and disabled persons. The principal reasons for the increased use are improved accessibility, low cost, and expanded areas of service. For the purposes of the report, 'elderly' is defined as any member of the population who is 60 years of age or older, and 'disabled' is defined as any person who has some type of disability. The Urban Mass Transportation Administration (UMTA) has recognized the need to consider the unique characteristics of elderly and disabled passengers in rail-transit emergency response planning. The needs of these passengers can bemore » addressed through carefully planned emergency response procedures, proper training of transit and emergency-response personnel, and effective use of equipment. The recommendations contained herein are therefore intended to assist rail-transit and emergency response organization personnel in evaluating their emergency response plans in terms of the needs of elderly and disabled passengers and, if necessary, to modify or supplement those plans accordingly. The report is intended to supplement the UMTA publication Recommended Emergency Preparedness Guidelines for Rail Transit Systems. That report contains general guidelines designed to assist rail-transit systems in assessing, developing, documenting, and improving their capabilities for responding to emergencies and in coordinating those efforts with emergency response organizations.« less

  9. Guidelines for the design and evaluation of human factors aspects of automated guideway transit systems

    DOT National Transportation Integrated Search

    1979-03-01

    This report is a summary of human factors considerations for the planning, : deSign, construction, and implementation of Automated Guideway Transit (AGT) Systems : including Downtown People Mover (DPM) systems. Design concepts such as passenger : saf...

  10. Detailed test plans : Evaluation of Utah Transit Authority Connection Protection system

    DOT National Transportation Integrated Search

    2003-10-31

    The purpose of this evaluation is to assess the effectiveness of the Connection Protection (CP) system implemented by the Utah Transit Authority (UTA). The objective of the CP system is to improve the reliability of transfers from the higher frequenc...

  11. 49 CFR 659.27 - Internal safety and security reviews.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the..., indicating that the rail transit agency is in compliance with its system safety program plan and system... security reviews indicate that the rail transit agency is not in compliance with its system safety program...

  12. Outcome-Based School-to-Work Transition Planning for Students with Severe Disabilities.

    ERIC Educational Resources Information Center

    Steere, Daniel E.; And Others

    1990-01-01

    A transition planning process that focuses on quality-of-life outcomes is presented. The process, which views employment not as an outcome but as a vehicle for the attainment of quality of life, involves six steps: orientation, personal profile development, identification of employment outcomes, measurement system, compatibility process, and…

  13. Guidelines for the design and evaluation of human factors aspects of automated guideway transit systems

    DOT National Transportation Integrated Search

    1979-03-01

    This document has been compiled to provide guidance in the planning, design, fabrication, and evaluation of human factors aspects of Automated Guideway Transit (AGT) Systems, including Downtown People Mover (DPM) systems. It is based on the present s...

  14. UAB UTC transit related activities

    DOT National Transportation Integrated Search

    2011-01-25

    The ITS Strategic Plan outlines a strategy for improving the efficiency of the Region's existing highway and transit systems. The Region's overall goal is to improve the efficiency and effectiveness of existing systems so as to reduce the need to bui...

  15. Career Planning Support System Program (CPSS). Final Report.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    Intended for the developmental practitioner, this report examines literature produced by the Career Planning Support System dealing with career guidance in four major areas: minority youth; women; transition from school to work; and program planning and evaluation. The area of minority youth includes a review of literature on: educational and…

  16. Energy management guidelines for rail transit systems : volume I. final report

    DOT National Transportation Integrated Search

    1986-09-01

    The cost of electricity is a significant portion of the operating costs of rail transit systems. The impact of increasing energy costs is felt by those systems presently in operation and will be felt by those in the planning or construction phases. B...

  17. Pediatric Provider's Perspectives on the Transition to Adult Health Care for Youth with Autism Spectrum Disorder: Current Strategies and Promising New Directions

    ERIC Educational Resources Information Center

    Kuhlthau, Karen A.; Warfield, Marji E.; Hurson, Jill; Delahaye, Jennifer; Crossman, Morgan K.

    2015-01-01

    Few youth with autism spectrum disorder (ASD) nationally report receiving services to help them transition from the pediatric health care system to the adult health care system. For example, only one-fifth (21.1%) of youth with ASD receive any transition planning services. To better understand why the transition from pediatric to adult health care…

  18. Reform of China's Technical and Vocational Education in the Transition from a Planned Economy System to a Socialist Market Economy System--A Case Study. Case Studies on Technical and Vocational Education in Asia and the Pacific.

    ERIC Educational Resources Information Center

    Yu, Zuguang; Zeng, Zida

    Since the early 1990s, China's government has followed a socialist market economy system. Accordingly, the technical and vocational education (TVE) should be restructured to meet its needs. Reform of the TVE system has four aspects. First, reform of the planning system includes a move from a central plan of enrollment to planning according to…

  19. Rapid transit system noise abatement program

    DOT National Transportation Integrated Search

    1972-01-01

    This program plan describes a broad program for the reduction of noise and vibration in rapid transit systems, which impacts the patrons and inhabitants of the nearby commuity. An UMTA/TSC survey has provided data on the most urgent needs and state-o...

  20. Partnership Bound: Using MAPS with Transitioning Students and Families from All Backgrounds

    ERIC Educational Resources Information Center

    Haines, Shana J.; Francis, Grace L.; Shepherd, Katharine G.; Ziegler, Meg; Mabika, Goma

    2018-01-01

    The McGill Action Planning System (also referred to as Making Action Plans or MAPS) is a supportive, strengths-based process that enables teams to understand each other and work together to support students in achieving their dreams. This process can work very well with all transitioning students with disabilities and their families, including…

  1. Remote sensing, geographical information systems, and spatial modeling for analyzing public transit services

    NASA Astrophysics Data System (ADS)

    Wu, Changshan

    Public transit service is a promising transportation mode because of its potential to address urban sustainability. Current ridership of public transit, however, is very low in most urban regions, particularly those in the United States. This woeful transit ridership can be attributed to many factors, among which poor service quality is key. Given this, there is a need for transit planning and analysis to improve service quality. Traditionally, spatially aggregate data are utilized in transit analysis and planning. Examples include data associated with the census, zip codes, states, etc. Few studies, however, address the influences of spatially aggregate data on transit planning results. In this research, previous studies in transit planning that use spatially aggregate data are reviewed. Next, problems associated with the utilization of aggregate data, the so-called modifiable areal unit problem (MAUP), are detailed and the need for fine resolution data to support public transit planning is argued. Fine resolution data is generated using intelligent interpolation techniques with the help of remote sensing imagery. In particular, impervious surface fraction, an important socio-economic indicator, is estimated through a fully constrained linear spectral mixture model using Landsat Enhanced Thematic Mapper Plus (ETM+) data within the metropolitan area of Columbus, Ohio in the United States. Four endmembers, low albedo, high albedo, vegetation, and soil are selected to model heterogeneous urban land cover. Impervious surface fraction is estimated by analyzing low and high albedo endmembers. With the derived impervious surface fraction, three spatial interpolation methods, spatial regression, dasymetric mapping, and cokriging, are developed to interpolate detailed population density. Results suggest that cokriging applied to impervious surface is a better alternative for estimating fine resolution population density. With the derived fine resolution data, a multiple route maximal covering/shortest path (MRMCSP) model is proposed to address the tradeoff between public transit service quality and access coverage in an established bus-based transit system. Results show that it is possible to improve current transit service quality by eliminating redundant or underutilized service stops. This research illustrates that fine resolution data can be efficiently generated to support urban planning, management and analysis. Further, this detailed data may necessitate the development of new spatial optimization models for use in analysis.

  2. Expert system verification concerns in an operations environment

    NASA Technical Reports Server (NTRS)

    Goodwin, Mary Ann; Robertson, Charles C.

    1987-01-01

    The Space Shuttle community is currently developing a number of knowledge-based tools, primarily expert systems, to support Space Shuttle operations. It is proposed that anticipating and responding to the requirements of the operations environment will contribute to a rapid and smooth transition of expert systems from development to operations, and that the requirements for verification are critical to this transition. The paper identifies the requirements of expert systems to be used for flight planning and support and compares them to those of existing procedural software used for flight planning and support. It then explores software engineering concepts and methodology that can be used to satisfy these requirements, to aid the transition from development to operations and to support the operations environment during the lifetime of expert systems. Many of these are similar to those used for procedural hardware.

  3. 49 CFR 659.23 - System security plan: contents.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false System security plan: contents. 659.23 Section 659.23 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State Oversight Agency § 659.23 System security...

  4. Intelligent transportation systems "ITS" : a strategic plan for the capitol region, executive summary

    DOT National Transportation Integrated Search

    1997-11-01

    The ITS Strategic Plan outlines a strategy for improving the efficiency of the Capitol Regions existing highway and transit systems. The Regions overall goal is to improve the efficiency and effectiveness of existing systems so as to reduce the...

  5. Morristown National Historical Park (NHP) alternative transportation system planning study

    DOT National Transportation Integrated Search

    2001-12-01

    This alternative transportation plan aims to define a more efficient transit plan for visitors to Morristown. Goals include protecting environmental resources, improving visitor experiences and safety, maximizing use of infrastructure, ensuring compa...

  6. Transitions to Care in the Community for Prison Releasees with HIV: a Qualitative Study of Facilitators and Challenges in Two States.

    PubMed

    Hammett, Theodore M; Donahue, Sara; LeRoy, Lisa; Montague, Brian T; Rosen, David L; Solomon, Liza; Costa, Michael; Wohl, David; Rich, Josiah D

    2015-08-01

    One in seven people living with HIV in the USA passes through a prison or jail each year, and almost all will return to the community. Discharge planning and transitional programs are critical but challenging elements in ensuring continuity of care, maintaining treatment outcomes achieved in prison, and preventing further viral transmission. This paper describes facilitators and challenges of in-prison care, transitional interventions, and access to and continuity of care in the community in Rhode Island and North Carolina based on qualitative data gathered as part of the mixed-methods Link Into Care Study of prisoners and releasees with HIV. We conducted 65 interviews with correctional and community-based providers and administrators and analyzed the transcripts using NVivo 10 to identify major themes. Facilitators of effective transitional systems in both states included the following: health providers affiliated with academic institutions or other entities independent of the corrections department; organizational philosophy emphasizing a patient-centered, personal, and holistic approach; strong leadership with effective "champions"; a team approach with coordination, collaboration and integration throughout the system, mutual respect and learning between corrections and health providers, staff dedicated to transitional services, and effective communication and information sharing among providers; comprehensive transitional activities and services including HIV, mental health and substance use services in prisons, timely and comprehensive discharge planning with specific linkages/appointments, supplies of medications on release, access to benefits and entitlements, case management and proactive follow-up on missed appointments; and releasees' commitment to transitional plans. These elements were generally present in both study states but their absence, which also sometimes occurred, represent ongoing challenges to success. The qualitative findings on the facilitators and challenges of the transitional systems were similar in the two states despite differences in context, demographics of target population, and system organization. Recommendations for improved transitional systems follow from the analysis of the facilitators and challenges.

  7. Highlands County transit development plan : (FY 2003/04-2007/08)

    DOT National Transportation Integrated Search

    2002-07-01

    To plan for a public transportation system, it is necessary to gain an understanding of the environment within which the system is operating. The following aspects are examined in this report: Demographics; public involvement; existing transportation...

  8. A methodology to modify land uses in a transit oriented development scenario.

    PubMed

    Sahu, Akshay

    2018-05-01

    Developing nations are adopting transit oriented development (TOD) strategies to decongest their transportation systems. These strategies are often adopted after the preparation of land use plans. The goal of this study was to build a methodology to modify these land uses using soft computing. This can help to achieve alternate land use plans relevant to TOD. The methodology incorporates TOD characteristics and objectives. Global TOD parameters (density, diversity, and distance to transit) were studied. Expert opinions gave weights and ranges for the parameters in an Indian TOD scenario. Rules to allocate land use was developed. Objective functions were defined. Four objectives were used. First was to maximize employment density, residential density and percent of mix land use. Second was to shape density and diversity with respect to distance. Third was to minimize degree of land use change, and fourth was to increase compactness of the land use allocation. The methodology was applied to two sectors of Naya Raipur, the new planned administrative capital of the state of Chhattisgarh, India. The city has implemented TOD in the form of Bus rapid transit system (BRTS) over an existing land use. Thousand random plans were generated through the methodology. Top 30 plans were selected as parent population for modifications through genetic algorithm (GA). Alternate plans were generated at the end of GA cycle. The best alternate plan was compared with successful BRTS and TOD land uses for its merits and demerits. It was also compared with the initial land use plan for empirical validation. Copyright © 2017 Elsevier Ltd. All rights reserved.

  9. From Plan to Market: Teaching Ideas for Social Studies, Economics, and Business Classes.

    ERIC Educational Resources Information Center

    Schug, Mark C.; Lopus, Jane S.; Morton, John S.

    This packet of lessons focuses on the transition from a legacy of central planning to a market orientation in the economic systems of Central and Eastern Europe, the newly independent states of the former Soviet Union, and China. These lessons seek to provide high school teachers with a well-informed approach to teaching about this transition. The…

  10. The use of the transition cost accounting system in health services research

    PubMed Central

    Azoulay, Arik; Doris, Nadine M; Filion, Kristian B; Caron, Joanna; Pilote, Louise; Eisenberg, Mark J

    2007-01-01

    The Transition cost accounting system integrates clinical, resource utilization, and financial information and is currently being used by several hospitals in Canada and the United States to calculate the costs of patient care. Our objectives were to review the use of hospital-based cost accounting systems to measure costs of treatment and discuss potential use of the Transition cost accounting system in health services research. Such systems provide internal reports to administrators for formulating major policies and strategic plans for future activities. Our review suggests that the Transition cost accounting information system may useful for estimating in-hospital costs of treatment. PMID:17686148

  11. The use of the transition cost accounting system in health services research.

    PubMed

    Azoulay, Arik; Doris, Nadine M; Filion, Kristian B; Caron, Joanna; Pilote, Louise; Eisenberg, Mark J

    2007-08-08

    The Transition cost accounting system integrates clinical, resource utilization, and financial information and is currently being used by several hospitals in Canada and the United States to calculate the costs of patient care. Our objectives were to review the use of hospital-based cost accounting systems to measure costs of treatment and discuss potential use of the Transition cost accounting system in health services research. Such systems provide internal reports to administrators for formulating major policies and strategic plans for future activities. Our review suggests that the Transition cost accounting information system may useful for estimating in-hospital costs of treatment.

  12. Kentucky Allied Health Project Final Report: A State System for Allied Health Education.

    ERIC Educational Resources Information Center

    Kentucky State Council on Higher Education, Frankfort.

    The accomplishments of the Kentucky Allied Health Project, which implemented a model articulated system of allied health education, are described. The system included plans to promote transition from one education level to another and articulation in educational planning and resource utilization. The project has greatly increased…

  13. Integrating intelligent transportation systems within the transportation planning process : an interim handbook.

    DOT National Transportation Integrated Search

    1998-01-01

    The Final Rule on Statewide Planning and Metropolitan Planning issued by the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) in October, 1993 established revised and more comprehensive processes for metropolitan and sta...

  14. Baseline Testing of the Hybrid Electric Transit Bus

    NASA Technical Reports Server (NTRS)

    Brown, Jeffrey C.; Eichenberg, Dennis J.; Thompson, William K.

    1999-01-01

    A government, industry and academic cooperative has developed a Hybrid Electric Transit Bus (HETB). Goals of the program include doubling the fuel economy of city transit buses currently in service, and reducing emissions to one-tenth of EPA standards. Unique aspects of the vehicle's power system include the use of ultra-capacitors for the energy storage system and the planned use of a natural gas fueled turbogenerator, to be developed from a small jet engine. At over 17000 kg gross weight, this is the largest vehicle to use ultra-capacitor energy storage. A description of the HETB, the results of performance testing, and future vehicle development plans are the subject of this report.

  15. Baltimore region rail system plan : report of the advisory committee

    DOT National Transportation Integrated Search

    2002-08-01

    This report by a committee of public and private leaders makes recommendations for a comprehensive rail transit system for the greater Baltimore metropolitan area. The objectives of the plan are simple: 1) to establish, over the next ten years, a tru...

  16. Safety models incorporating graph theory based transit indicators.

    PubMed

    Quintero, Liliana; Sayed, Tarek; Wahba, Mohamed M

    2013-01-01

    There is a considerable need for tools to enable the evaluation of the safety of transit networks at the planning stage. One interesting approach for the planning of public transportation systems is the study of networks. Network techniques involve the analysis of systems by viewing them as a graph composed of a set of vertices (nodes) and edges (links). Once the transport system is visualized as a graph, various network properties can be evaluated based on the relationships between the network elements. Several indicators can be calculated including connectivity, coverage, directness and complexity, among others. The main objective of this study is to investigate the relationship between network-based transit indicators and safety. The study develops macro-level collision prediction models that explicitly incorporate transit physical and operational elements and transit network indicators as explanatory variables. Several macro-level (zonal) collision prediction models were developed using a generalized linear regression technique, assuming a negative binomial error structure. The models were grouped into four main themes: transit infrastructure, transit network topology, transit route design, and transit performance and operations. The safety models showed that collisions were significantly associated with transit network properties such as: connectivity, coverage, overlapping degree and the Local Index of Transit Availability. As well, the models showed a significant relationship between collisions and some transit physical and operational attributes such as the number of routes, frequency of routes, bus density, length of bus and 3+ priority lanes. Copyright © 2012 Elsevier Ltd. All rights reserved.

  17. Your Library's Future: When Leaders Leave, Succession Planning Can Smooth the Transitions

    ERIC Educational Resources Information Center

    Singer, Paula; Goodrich, Jeanne; Goldberg, Linda

    2004-01-01

    The future is around the corner. Succession planning will only happen when the right ingredients are there at the start. This article describes thirteen succession planning ingredients that will aid in the future succession of library systems.

  18. Critical Career Transitions: A Model for Designing Career Services.

    ERIC Educational Resources Information Center

    Leibowitz, Zandy B.; Schlossberg, Nancy K.

    1982-01-01

    Examines the three components which form the basis for designing and offering career transition workshops for employees at Goddard Space Flight Center: structuring support systems, providing cognitive information, and planning. (CT)

  19. Gettysburg National Military Park alternative transportation system planning study

    DOT National Transportation Integrated Search

    2004-06-01

    This project identifies and evaluates transit service alternatives in the Gettysburg, Pennsylvania area, including Gettysburg National Military Park, the Borough of Gettysburg, and surrounding townships. The report concludes that public transit would...

  20. Land use impacts of bus rapid transit : phase II -- effects of BRT station proximity on property values along the Boston silver line Washington Street Corridor.

    DOT National Transportation Integrated Search

    2012-07-01

    The development of Bus Rapid Transit (BRT) systems is relatively recent in the U.S.; however, several systems are operating and many : more are being planned. A comprehensive understanding of the relationship between land uses and BRT systems is need...

  1. IDC Re-Engineering Phase 3 Development Plan.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Harris, James M.; Burns, John F.; Pollock, David L.

    2017-01-01

    Sandia National Laboratories has prepared a project development plan that proposes how the parties interested in the IDC Re-Engineering system will coordinate its development, testing and transition to operations.

  2. 15 CFR 273.6 - Reporting requirement.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... implementation plans, with a current timetable for the agency's transition to the metric system, as well as actions planned for the budget year involved to implement fully the metric system, in accordance with this... OF STANDARDS AND TECHNOLOGY, DEPARTMENT OF COMMERCE METRIC CONVERSION POLICY FOR FEDERAL AGENCIES...

  3. Clinical Transition Framework: Integrating Coaching Plans, Sampling, and Accountability in Clinical Practice Development.

    PubMed

    Boyer, Susan A; Mann-Salinas, Elizabeth A; Valdez-Delgado, Krystal K

    The clinical transition framework (CTF) is a competency-based practice development system used by nursing professional development practitioners to support nurses' initial orientation or transition to a new specialty. The CTF is applicable for both new graduate and proficient nurses. The current framework and tools evolved from 18 years of performance improvement and research projects engaged in both acute and community care environments in urban and rural settings. This article shares core CTF concepts, a description of coaching plans, and a professional accountability statement as experienced within the framework.

  4. Spitzer Mission Operation System Planning for IRAC Warm-Instrument Characterization

    NASA Technical Reports Server (NTRS)

    Hunt, Joseph C., Jr.; Sarrel, Marc A.; Mahoney, William A.

    2010-01-01

    This paper will describe how the Spitzer Mission Operations System planned and executed the characterization phase between Spitzer's cryogenic mission and its warm mission. To the largest extend possible, the execution of this phase was done with existing processing and procedures. The modifications that were made were in response to the differences of the characterization phase compared to normal phases before and after. The primary two categories of difference are: unknown date of execution due to uncertainty of knowledge of the date of helium depletion, and the short cycle time for data analysis and re-planning during execution. In addition, all of the planning and design had to be done in parallel with normal operations, and we had to transition smoothly back to normal operations following the transition. This paper will also describe the re-planning we had to do following an anomaly discovered in the first days after helium depletion.

  5. Developing Data Resources for the 21st Century : New Uses for Archived Intelligent Transportation Systems (ITS) Transit Data

    DOT National Transportation Integrated Search

    2003-08-01

    This report is broken into four sections. Section 1 provides a very brief description of transit in early American cities, describes the second generation of transit and the role of government planning and concludes with the third generation of trans...

  6. Guidance on the prevention and mitigation of environmental, health and safety impacts of electromagnetic fields and radiation for electric transit systems

    DOT National Transportation Integrated Search

    2008-01-02

    The Federal Transit Administration (FTA) Office of Planning and Environment (TPE) tasked the Volpe Center to develop guidance for transit planners, in order to address persisting public health and safety concerns with prolonged EMF environmental expo...

  7. Challenges for Planning and Maintaining of Urban Rain Harvesting Systems- the case of Hammarby Sjöstad and Årstafältet in Stockholm

    NASA Astrophysics Data System (ADS)

    Suleiman, Lina

    2017-04-01

    Planners and policymakers' concern escalates over conventional systems dealing with rains in cities based on domination and control of nature rather than harmony and design with nature. A new spatial planning paradigm is needed to put in place systems which mimic natural water systems and promise multiple values instead of systems consider rain as a source of problem. However, such approach embodies significant planning challenges. Urban rain harvesting systems (URHs) are inherently viewed as 'sociotechnical' systems. As such, planning processes should consider the interdependence of 'social' and 'technical' aspects as essential elements if a transition towards sustainable urban water systems is to be realised. Drawing on a common understanding for what urban rain harvesting systems should deliver in terms of 'functions' and 'added values', a generic planning framework is developed to inform practitioners on how the 'socio' and 'technical' elements should be assimilated in a long-term and integrated planning processes of URHs. Using the developed framework, the paper examines the planning and maintenance processes of urban rain harvesting systems in Årstafältet and Hammarby Sjöstad respectively. Results show that planners lack a common operational understanding on how these systems should be designed holistically in a long term and integrated planning processes creating working gabs or positional conflicts. In practice, urban planners and water engineers look at these systems as either urban design component or water drainage system to deal with technical functions hindering a smooth transition path towards urban rain harvesting systems. The paper concludes on the urgency for reordering roles and relations within a new set-up organisation to incubate these systems in long-term planning and maintenance processes. Key words: 'Sociotechnical' system, Water, Planning, Urban Rain Harvesting systems (URHs), Hammarby Sjostad and Årstafältet

  8. 10 CFR 5.230 - Transition plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Transition plans. 5.230 Section 5.230 Energy NUCLEAR... FEDERAL FINANCIAL ASSISTANCE Coverage § 5.230 Transition plans. (a) Submission of plans. An institution to... either a single transition plan applicable to all such units, or a separate transition plan applicable to...

  9. 10 CFR 5.230 - Transition plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Transition plans. 5.230 Section 5.230 Energy NUCLEAR... FEDERAL FINANCIAL ASSISTANCE Coverage § 5.230 Transition plans. (a) Submission of plans. An institution to... either a single transition plan applicable to all such units, or a separate transition plan applicable to...

  10. 10 CFR 5.230 - Transition plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Transition plans. 5.230 Section 5.230 Energy NUCLEAR... FEDERAL FINANCIAL ASSISTANCE Coverage § 5.230 Transition plans. (a) Submission of plans. An institution to... either a single transition plan applicable to all such units, or a separate transition plan applicable to...

  11. 10 CFR 5.230 - Transition plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Transition plans. 5.230 Section 5.230 Energy NUCLEAR... FEDERAL FINANCIAL ASSISTANCE Coverage § 5.230 Transition plans. (a) Submission of plans. An institution to... either a single transition plan applicable to all such units, or a separate transition plan applicable to...

  12. 29 CFR 36.230 - Transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 29 Labor 1 2010-07-01 2010-07-01 true Transition plans. 36.230 Section 36.230 Labor Office of the... FEDERAL FINANCIAL ASSISTANCE Coverage § 36.230 Transition plans. (a) Submission of plans. An institution... submit either a single transition plan applicable to all such units, or a separate transition plan...

  13. 10 CFR 5.230 - Transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Transition plans. 5.230 Section 5.230 Energy NUCLEAR... FEDERAL FINANCIAL ASSISTANCE Coverage § 5.230 Transition plans. (a) Submission of plans. An institution to... either a single transition plan applicable to all such units, or a separate transition plan applicable to...

  14. Development of Economic Factors in Tunnel Construction

    DOT National Transportation Integrated Search

    1977-12-01

    The escalating cost of underground construction of urban transportation systems has made transit planning, especially construction cost estimating, difficult. This is a study of the cost of construction of underground, rapid transit tunnels in soft g...

  15. 18 CFR 1317.230 - Transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 2 2010-04-01 2010-04-01 false Transition plans. 1317... Coverage § 1317.230 Transition plans. (a) Submission of plans. An institution to which § 1317.225 applies... transition plan applicable to all such units, or a separate transition plan applicable to each such unit. (b...

  16. Land use planning using transit oriented development concept: Case study: Salaya station

    NASA Astrophysics Data System (ADS)

    Jarritthai, Supanee; Techpeeraparnich, Wasaporn

    2017-10-01

    The urban sprawl of Bangkok has increased with a motorization rate along with the expansion of the road network to adjacent cities. Nakhonpathom province, located at the southern edge of Bangkok has been affected by the urban sprawl. One of Nakhonpathom's Districts named "Salaya" Salaya has been quickly urbanized due to the establishment of many large academic institutes, such as universities, colleges and high schools as well as many commercial shopping malls. The period of 2013-2017, the Thai government introduced sustainable urban planning policy and promoted the use of public transportation systems. The Light Red Line railway extension of the Bangkok Metro Transit system will soon be constructed and the current Salaya Station will be replaced with new station. Many railway expansion projects will be built, should be designed by using transit-oriented development (TOD) scheme. This paper explores demographic information of the area, the demands of the community and relevant stakeholders for designing of the area using TOD. The proposed land use planning is designed based on the existing condition of the area as much as possible to meet the TOD standard and stakeholders' requirement. The result revealed that the guidelines of transit oriented development concept were of importance not only for planning of urban land use, supporting public transport, but also improving the quality of life.

  17. Metrication report to the Congress. 1991 activities and 1992 plans

    NASA Technical Reports Server (NTRS)

    1991-01-01

    During 1991, NASA approved a revised metric use policy and developed a NASA Metric Transition Plan. This Plan targets the end of 1995 for completion of NASA's metric initiatives. This Plan also identifies future programs that NASA anticipates will use the metric system of measurement. Field installations began metric transition studies in 1991 and will complete them in 1992. Half of NASA's Space Shuttle payloads for 1991, and almost all such payloads for 1992, have some metric-based elements. In 1992, NASA will begin assessing requirements for space-quality piece parts fabricated to U.S. metric standards, leading to development and qualification of high priority parts.

  18. Suicide and Mass Urban Transit.

    ERIC Educational Resources Information Center

    Berman, Alan L., Ed.

    1991-01-01

    Presents case consultation in which consultants respond to issues of urban planning for mass transit (subway) system and how to maximize prevention of intentional injury within subway stations. Also asks what type of research study should be used and what type of data collected once system is operating. Case is discussed by Morton M. Silverman and…

  19. Closed Circuit Television in Transit Stations : Application Guidelines.

    DOT National Transportation Integrated Search

    1980-08-01

    It is intended that readers will acquire information from this document that will help in planning, designing, installing, operating, and evaluating the most appropriate CCTV transit surveillance system for their own purposes. This report is arranged...

  20. Metropolitan Transit Research Study

    DOT National Transportation Integrated Search

    1956-12-14

    Presents an historical and current overview of public transit in Chicago and discusses the steps to be taken to integrate the planning and financing of a regional transportation system for Chicago. Details the economic impact of parking and traffic c...

  1. 23 CFR 450.306 - Scope of the metropolitan transportation planning process.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... transportation improvements and State and local planned growth and economic development patterns; (6) Enhance the... transportation system development, land use, employment, economic development, human and natural environment, and... CFR part 940. (g) Preparation of the coordinated public transit-human services transportation plan, as...

  2. Cape Cod Transit Task Force : Five-Year Public Transportation Plan

    DOT National Transportation Integrated Search

    2002-06-30

    The U.S. Department of Transportation's Volpe National Transportation Systems : Center has been working in cooperation with the Cape Cod Regional Transit : Authority, the Cape Cod Commission, and other organizations participating on : the Cape Cod Tr...

  3. Mass transit : review of the South Boston piers transitway finance plan

    DOT National Transportation Integrated Search

    2000-11-09

    The Massachusetts Bay Transportation Authority (MBTA) is constructing a 1.5-mile underground transitway to connect its existing transit system with the South Boston Piers area, which is undergoing significant economic development. The South Boston Pi...

  4. Medical Devices Transition to Information Systems: Lessons Learned

    PubMed Central

    Charters, Kathleen G.

    2012-01-01

    Medical devices designed to network can share data with a Clinical Information System (CIS), making that data available within clinician workflow. Some lessons learned by transitioning anesthesia reporting and monitoring devices (ARMDs) on a local area network (LAN) to integration of anesthesia documentation within a CIS include the following categories: access, contracting, deployment, implementation, planning, security, support, training and workflow integration. Areas identified for improvement include: Vendor requirements for access reconciled with the organizations’ security policies and procedures. Include clauses supporting transition from stand-alone devices to information integrated into clinical workflow in the medical device procurement contract. Resolve deployment and implementation barriers that make the process less efficient and more costly. Include effective field communication and creative alternatives in planning. Build training on the baseline knowledge of trainees. Include effective help desk processes and metrics. Have a process for determining where problems originate when systems share information. PMID:24199054

  5. Leading change: evidence-based transition.

    PubMed

    Lewis, Brennan; Allen, Stephanie

    2015-01-01

    The purpose of this article was to provide a framework for evidence-based transition of patient populations within an acute care pediatric institution. Transition within a hospital is foreseeable, given the ever-changing needs of the patients within an evolving healthcare system. These changes include moving patient populations because of expansion, renovation, or cohorting similar patient diagnoses to provide care across a continuum. Over the past 1 to 2 years, Children's Health Children's Medical Center Dallas has experienced a wide variety of transition. To provide a smooth transition for patients and families into new care areas resulting in a healthy work environment for all team members. The planning phase for patient population moves, and transition should address key aspects to include physical location and care flow, supplies and equipment, staffing model and human resources (HR), education and orientation, change process and integrating teams, and family preparation. It is imperative to consider these aspects in order for transitions within a healthcare system to be successful. During a time of such transitions, the clinical nurse specialist (CNS) is a highly valuable team member offering a unique perspective and methodological approach, which is central to the new initiative's overall success. The themes addressed in this article on evidence-based transition are organized according to the CNS spheres of influence: system/organization, patient/family, and nursing. An evidence-based transition plan was developed and implemented successfully with the support from the CNS for 3 patient populations. Organizational leadership gained an increased awareness of the CNS role at the conclusion of each successful transition. The CNS plays a pivotal role as clinical experts and proponents of evidence-based practice and effects change in the system/organization, nursing, and patient/family spheres of influence. While transitions can be a source of stress for leaders and bedside staff, it is also a time that allows for growth and new opportunities for staff and may result in development of a healthier work environment. The CNS is able to provide leadership while working collaboratively to oversee the moves with a forward-thinking approach. There are key components to consider during times of transition. These include (1) organize, plan, and improve work efficiencies during a construction build; (2) identify the key elements for improvement in nurse and patient satisfaction; (3) develop or maintain healthy work environment standards; (4) establish adequate staffing levels and staff education to successfully care for patient populations following transition; and (5) support the staff and patients during transition.

  6. Trends and Issues in U.S. Navy Manpower

    DTIC Science & Technology

    1985-01-01

    Planning (ADSTAP) system7, consists of several subsystems and models for planning and managing enlisted manpower, personnel, and training. It was... models to provide information for formulating goals and planning the transition from current inventory to estab- lished objectives 9 Operational...planning models to provide information for formulating operating plans to control the size and quality (ratings or skills and pay grades) of the active-duty

  7. Report: Lack of Project Plan Resulted in Transition and Contractor Performance Problems for the Institutional Controls Tracking System

    EPA Pesticide Factsheets

    Report #09-P-0128, March 25, 2009. Lack of compliance with established project management procedures resulted in transitional problems in 2005 that delayed ICTS development and negatively affected contractor performance.

  8. FTA Transit Intelligent Transportation System Architecture Consistency Review - 2010 Update

    DOT National Transportation Integrated Search

    2011-07-01

    This report provides an assessment on the level of compliance among the FTA grantees with the National ITS Architecture Policy, specifically examining three items: 1. The use and maintenance of Regional ITS Architectures by transit agencies to plan, ...

  9. Representation of transit ITS in network-based travel models

    DOT National Transportation Integrated Search

    2005-03-01

    The increased use of Intelligent Transportation Systems (ITS) technology in public transit has two major impacts on travel forecasting. First, the technology will often result in an improved volume and quality of data that may be used for planning. S...

  10. Recommendation on transition from primary/secondary radar to secondary-only radar capability

    DOT National Transportation Integrated Search

    1994-10-01

    This recommendation has been prepared to support the FAA decision to deactivate primary Long-range radars and presents a : transition strategy and implementation plan for the transformation of the existing primary/secondary en route radar : system to...

  11. 45 CFR 618.230 - Transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 45 Public Welfare 3 2010-10-01 2010-10-01 false Transition plans. 618.230 Section 618.230 Public... Coverage § 618.230 Transition plans. (a) Submission of plans. An institution to which § 618.225 applies and... plan applicable to all such units, or a separate transition plan applicable to each such unit. (b...

  12. 34 CFR 106.17 - Transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Transition plans. 106.17 Section 106.17 Education... Coverage § 106.17 Transition plans. (a) Submission of plans. An institution to which § 106.16 applies and... plan applicable to all such units, or a separate transition plan applicable to each such unit. (b...

  13. The Peñalosa Principle of Transportation Democracy: Lessons from Bogotá on the Morality of Urban Mobility.

    PubMed

    Epting, Shane

    2017-08-01

    The mayor of Bogotá, Enrique Peñalosa strives to deliver transit services that promote social equity through bicycle lanes, improved sidewalks, and a world-famous Bus Rapid Transit (BRT) system, "TransMilenio." Through examining the principles that guide his planning, we can flesh out a starting point for socially just transit systems. While such measures can alleviate several harms that transit systems cause, they rest on an incomplete foundation due to their top-down nature. To amend this situation, the author argues for a restorative justice approach to transportation democracy, using examples from Peñalosa's mayoral tenure. In turn, lessons from Bogotá's transportation history reveal how to develop transit systems that strongly favor justice.

  14. Progress in Decommissioning the Humboldt Bay Power Plant - 13604

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rod, Kerry; Shelanskey, Steven K.; Kristofzski, John

    Decommissioning of the Pacific Gas and Electric (PG and E) Company Humboldt Bay Power Plant (HBPP) Unit 3 nuclear facility has now, after more than three decades of SAFSTOR and initial decommissioning work, transitioned to full-scale decommissioning. Decommissioning activities to date have been well orchestrated and executed in spite of an extremely small work site with space constricted even more by other concurrent on-site major construction projects including the demolition of four fossil units, construction of a new generating station and 60 KV switchyard upgrade. Full-scale decommissioning activities - now transitioning from Plant Systems Removal (PG and E self-perform) tomore » Civil Works Projects (contractor performed) - are proceeding in a safe, timely, and cost effective manner. As a result of the successful decommissioning work to date (approximately fifty percent completed) and the intense planning and preparations for the remaining work, there is a high level of confidence for completion of all HBPP Unit 3 decommissions activities in 2018. Strategic planning and preparations to transition into full-scale decommissioning was carried out in 2008 by a small, highly focused project team. This planning was conducted concurrent with other critical planning requirements such as the loading of spent nuclear fuel into dry storage at the Independent Spent Fuel Storage Installation (ISFSI) finishing December 2008. Over the past four years, 2009 through 2012, the majority of decommissioning work has been installation of site infrastructure and removal of systems and components, known as the Plant System Removal Phase, where work scope was dynamic with significant uncertainty, and it was self-performed by PG and E. As HBPP Decommissioning transitions from the Plant System Removal Phase to the Civil Works Projects Phase, where work scope is well defined, a contracting plan similar to that used for Fossil Decommissioning will be implemented. Award of five major work scopes in various stages of development are planned as they include: Turbine Building Demolition, Nuclear Facilities Demolition and Excavation, Intake and Discharge Canal Remediation, Office Facility Demobilization, and Final Site Restoration. Benefits realized by transitioning to the Civil Works Projects Phase with predominant firm fixed-price/fixed unit price contracting include single civil works contractor who can coordinate concrete shaving, liner removal, structural removal, and other demolition activities; streamline financial control; reduce PG and E overhead staffing; and provide a specialized Bidder Team with experience from other similar projects. (authors)« less

  15. Local energy governance in vermont: an analysis of energy system transition strategies and actor capacity

    NASA Astrophysics Data System (ADS)

    Rowse, Tarah

    While global, national, and regional efforts to address climate and energy challenges remain essential, local governments and community groups are playing an increasingly stronger and vital role. As an active state in energy system policy, planning and innovation, Vermont offers a testing ground for research into energy governance at the local level. A baseline understanding of the energy planning and energy organizing activities initiated at the local level can support efforts to foster a transition to a sustainable energy system in Vermont. Following an inductive, applied and participatory approach, and grounded in the fields of sustainability transitions, energy planning, and community energy, this research project identifies conditions for change, including opportunities and challenges, within Vermont energy system decision-making and governance at the local level. The following questions are posed: What are the main opportunities and challenges for sustainable energy development at the town level? How are towns approaching energy planning? What are the triggers that will facilitate a faster transition to alternative energy systems, energy efficiency initiatives, and localized approaches? In an effort to answer these questions two studies were conducted: 1) an analysis of municipal energy plans, and 2) a survey of local energy actors. Study 1 examined Vermont energy planning at the state and local level through a review and comparison of 40 municipal plan energy chapters with the state 2011 Comprehensive Energy Plan. On average, municipal plans mentioned just over half of the 24 high-level strategies identified in the Comprehensive Energy Plan. Areas of strong and weak agreement were examined. Increased state and regional interaction with municipal energy planners would support more holistic and coordinated energy planning. The study concludes that while municipalities are keenly aware of the importance of education and partnerships, stronger policy mechanisms and financial stimulus are essential if Vermont hopes to increase strategic energy planning alignment and spur whole-scale energy system change. Study 2 examined local energy actors to assess their ability to develop and sustain energy action on the local level. A survey of 120 municipalities collected statewide baseline data covering the structures, processes, and activities of local energy actors. The analysis examined the role that various forms of capacity play in local energy activity. The results show that towns with higher incomes are more likely to have local energy actors and towns with higher populations have higher aggregate energy activity levels. Structurally, energy actors that had both an energy coordinator and an energy committee were more active, and municipal committees were more active than independent committees. Access to a budget and volunteer engagement were both associated with higher activity levels. The network of local energy actors in Vermont consists of committed and knowledgeable volunteers. Yet, the capacity of these local energy actors to implement sustainable energy change is limited due to resource constraints of time and money. In most cases, the scope of municipal energy planning strategy is modest. Prioritization of strategy and action at the central and local levels, along with increased interaction and coordination, is necessary to increase the regional compatibility and pace of energy system transformation.

  16. San Francisco Municipal Railway 5-Year Plan: 1979-1984

    DOT National Transportation Integrated Search

    1979-02-22

    Presents MUNI's five year "master" plan for the programming of transit operations. It describes the existing system and what is anticipated for the future. It covers route design, operations, rolling stock requirements, and evaluates each on the basi...

  17. Data analysis for bus planning and monitoring

    DOT National Transportation Integrated Search

    2000-01-01

    This synthesis report will be of interest to transit agency managers, their schedule and operations planning staffs and others that are responsible for information about systems operations and ridership. It will also be of interest to others who inte...

  18. 31 CFR 28.230 - Transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Transition plans. 28.230 Section 28... Transition plans. (a) Submission of plans. An institution to which § 28.225 applies and that is composed of more than one administratively separate unit may submit either a single transition plan applicable to...

  19. Operational Assessment of Paralympics Transit Systems : Low-Floor Buses, Lift-Equipped Buses, and Signage

    DOT National Transportation Integrated Search

    1997-02-01

    From August 15-25, Atlanta hosted the paralympics, a world-class athletic competition for athletes with disabilities. To support the Paralympics, a specialized transit service was planned and deployed to service the travel needs of athletes, trainers...

  20. Automatic Fare Collection Equipment, Reliability and Maintainability Assessment Plan for Urban Rail Transit Properties

    DOT National Transportation Integrated Search

    1981-03-01

    This project was conducted as part of UMTA's Rail Transit Fare Collection Program developed by the Transportation Systems Center of the U.S. Department of Transportation. The report presents a generalized survey methodology for conducting assessments...

  1. The influence of service planning decisions on rail transit success or failure.

    DOT National Transportation Integrated Search

    2009-06-01

    Some United States metropolitan areas with rail transit systems enjoy ridership and productivity success while : others do not. This study examines the experiences of 11 U.S. metropolitan areas with between onr million and : five million persons to b...

  2. 78 FR 61251 - The National Public Transportation Safety Plan, the Public Transportation Agency Safety Plan, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-03

    ... Transportation Agency Safety Plan, and the Public Transportation Safety Certification Training Program; Transit... systems are in a state of good repair, and provide increased transparency into agencies' budgetary... October 2001, mail received through the U.S. Postal Service may be subject to delays. Parties submitting...

  3. Planning for transit-supportive development : a practitioner's guide. Section 2 : general transit-supportive development planning topics.

    DOT National Transportation Integrated Search

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  4. Planning for transit-supportive development : a practitioner's guide. Section 5 : local planning and transit-supportive development.

    DOT National Transportation Integrated Search

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  5. Planning for transit-supportive development : a practitioner's guide. Section 4 : corridor planning and transit-supportive development.

    DOT National Transportation Integrated Search

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  6. Transition Planning

    ERIC Educational Resources Information Center

    Statfeld, Jenna L.

    2011-01-01

    Post-school transition is the movement of a child with disabilities from school to activities that occur after the completion of school. This paper provides information about: (1) post-school transition; (2) transition plan; (3) transition services; (4) transition planning; (5) vocational rehabilitation services; (6) services that are available…

  7. Skill Formation and Utilisation in the Post-Soviet Transition: Higher Education Planning in Post-Soviet Georgia

    ERIC Educational Resources Information Center

    Gvaramadze, Irakli

    2010-01-01

    Changes in the former Soviet system had a dramatic influence on higher education in Georgia. The main objective of the current article is to analyse implications of the post-Soviet transition for the skill formation and skill utilisation system in Georgia. In particular, the study analyses recent trends in Georgian higher education including…

  8. V/STOL propulsion control analysis: Phase 2, task 5-9

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Typical V/STOL propulsion control requirements were derived for transition between vertical and horizontal flight using the General Electric RALS (Remote Augmented Lift System) concept. Steady-state operating requirements were defined for a typical Vertical-to-Horizontal transition and for a typical Horizontal-to-Vertical transition. Control mode requirements were established and multi-variable regulators developed for individual operating conditions. Proportional/Integral gain schedules were developed and were incorporated into a transition controller with capabilities for mode switching and manipulated variable reassignment. A non-linear component-level transient model of the engine was developed and utilized to provide a preliminary check-out of the controller logic. An inlet and nozzle effects model was developed for subsequent incorporation into the engine model and an aircraft model was developed for preliminary flight transition simulations. A condition monitoring development plan was developed and preliminary design requirements established. The Phase 1 long-range technology plan was refined and restructured toward the development of a real-time high fidelity transient model of a supersonic V/STOL propulsion system and controller for use in a piloted simulation program at NASA-Ames.

  9. Seamless transitions from early prototypes to mature operational software - A technology that enables the process for planning and scheduling applications

    NASA Technical Reports Server (NTRS)

    Hornstein, Rhoda S.; Wunderlich, Dana A.; Willoughby, John K.

    1992-01-01

    New and innovative software technology is presented that provides a cost effective bridge for smoothly transitioning prototype software, in the field of planning and scheduling, into an operational environment. Specifically, this technology mixes the flexibility and human design efficiency of dynamic data typing with the rigor and run-time efficiencies of static data typing. This new technology provides a very valuable tool for conducting the extensive, up-front system prototyping that leads to specifying the correct system and producing a reliable, efficient version that will be operationally effective and will be accepted by the intended users.

  10. Planning for transit-supportive development : a practitioner's guide. Section 3 : regional vision planning and transit-supportive development.

    DOT National Transportation Integrated Search

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  11. Preparing for the Future: A Student Transition Handbook. Documentation of a Collaborative Transition Planning System: West End SELPA.

    ERIC Educational Resources Information Center

    Cahill, Deborah, Comp.; And Others

    This handbook acquaints special needs students with programs and opportunities available to help them make the transition from school to working. The guide helps students identify their personal strengths, identify goals for the future, determine skills needed to reach those goals, and determine help needed from others. The body of the guide…

  12. Economic impacts of bus rapid transit in southeast Michigan.

    DOT National Transportation Integrated Search

    2015-12-01

    In recent years, Bus Rapid Transit (BRT) has generated great interest across the United States. There are more than 20 BRT : systems in existence, and more are in the planning stage (including in Detroit). Within the next few years, BRT will be plann...

  13. Integrated corridor management initiative : demonstration phase evaluation, San Diego institutional and organizational analysis test plan.

    DOT National Transportation Integrated Search

    2003-03-01

    In March of 2001, the Federal Highway Administration (FHWA), in conjunction with the Federal Transit Administration (FTA), engaged Gannett Fleming, Inc., to develop the first ever Tunnel Management System to benefit both highway and rail transit tunn...

  14. Chittenden County Transportation Authority, Vermont multimodal passenger information, transit signal priority and ITS system planning local evaluation report

    DOT National Transportation Integrated Search

    2006-06-01

    The Chittenden County Transportation Authority (CCTA) was founded in 1973 by the Vermont Legislature and provides transit services in northwestern Vermont. CCTA is a full service public transportation provider, offering services including fixed route...

  15. Integrated Care Planning for Cancer Patients: A Scoping Review

    PubMed Central

    Arthurs, Erin; Gradin, Sharon; MacKinnon, Marnie; Sussman, Jonathan; Kukreti, Vishal

    2017-01-01

    Introduction: There has been a growing emphasis on the use of integrated care plans to deliver cancer care. However little is known about how integrated care plans for cancer patients are developed including featured core activities, facilitators for uptake and indicators for assessing impact. Methods: Given limited consensus around what constitutes an integrated care plan for cancer patients, a scoping review was conducted to explore the components of integrated care plans and contextual factors that influence design and uptake. Results: Five types of integrated care plans based on the stage of cancer care: surgical, systemic, survivorship, palliative and comprehensive (involving a transition between stages) are described in current literature. Breast, esophageal and colorectal cancers were common disease sites. Multi-disciplinary teams, patient needs assessment and transitional planning emerged as key features. Provider buy-in and training alongside informational technology support served as important facilitators for plan uptake. Provider-level measurement was considerably less robust compared to patient and system-level indicators. Conclusions: Similarities in design features, components and facilitators across the various types of integrated care plans indicates opportunities to leverage shared features and enable a management lens that spans the trajectory of a patient’s journey rather than a phase-specific silo approach to care. PMID:29588638

  16. Durability of geosynthetics for highway applications : interim report

    DOT National Transportation Integrated Search

    2003-06-01

    BRT will utilize Intelligent Transportation System (ITS) technology, modern land use planning and transportation policies to support new concepts for rapid transit systems based on bus-like vehicles. The success of some of these pioneering systems, s...

  17. Bus rapid transit vehicle characteristics.

    DOT National Transportation Integrated Search

    2001-06-01

    This report focuses on vehicle issues related to BRT systems. The characteristics of BRT systems described in this report are : developed based on existing or planned BRT systems. Information on the vendors offerings is based on information from t...

  18. Evaluation of the Monitor-CTA Automatic Vehicle Monitoring System

    DOT National Transportation Integrated Search

    1974-03-01

    In June 1972 the Urban Mass Transportation Administration requested that the Transportation System Center of DOT perform an evaluation of the CTA (Chicago Transit Authority) Monitor-Automatic Vehicle Monitor (AVM) system. TSC planned the overall eval...

  19. 41 CFR 105-8.150-4 - Transition plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Transition plan. 105-8... Transition plan. In the event that structural changes to facilities will be undertaken to achieve program accessibility, the agency shall develop, by March 9, 1992; the transition plan setting forth the steps necessary...

  20. Medical care transition planning and dental care use for youth with special health care needs during the transition from adolescence to young adulthood: a preliminary explanatory model

    PubMed Central

    Chi, Donald L.

    2013-01-01

    Objectives To test the hypotheses that youth with special health care needs (YSHCN) with a medical care transition plan are more likely to use dental care during the transition from adolescence to young adulthood and that different factors are associated with dental utilization for YSHCN with and YSHCN without functional limitations. Methods National Survey of CSHCN (2001) and Survey of Adult Transition and Health (2007) data were analyzed (N=1,746). The main predictor variable was having a medical care transition plan, defined as having discussed with a doctor how health care needs might change with age and having developed a transition plan. The outcome variable was dental care use in 2001 (adolescence) and 2007 (young adulthood). Multiple variable Poisson regression models with robust standard errors were used to estimate covariate-adjusted relative risks (RR). Results About 63% of YSHCN had a medical care transition plan and 73.5% utilized dental care. YSHCN with a medical care transition plan had a 9% greater relative risk (RR) of utilizing dental care than YSHCN without a medical care transition plan (RR:1.09; 95% CI:1.03–1.16). In the models stratified by functional limitation status, having a medical care transition plan was significantly associated with dental care use, but only for YSHCN without functional limitations (RR:1.11; 95% CI:1.04–1.18). Conclusions Having a medical care transition plan is significantly associated with dental care use, but only for YSHCN with no functional limitation. Dental care should be an integral part of the comprehensive health care transition planning process for all YSHCN. PMID:23812799

  1. System description and requirements document.

    DOT National Transportation Integrated Search

    2007-10-10

    The Next Generation 911 Initiative (NG911) : is a U.S. Department of Transportation (USDOT) : research and development project that will help : define the system architecture and develop a : transition plan that considers responsibilities...

  2. Technical Assessment of Roaring Fork Transit Authority ITS / Related Alternative Transportation Concepts on the White River National Forest.

    DOT National Transportation Integrated Search

    2007-12-12

    At the request of the U.S. Department of Agriculture Forest Service (USFS), the U.S. DOT : Volpe Center conducted a review of the status of Intelligent Transportation Systems (ITS) : planning by the Roaring Fork Transit Authority (RFTA). The assessme...

  3. Smart textile-based wearable biomedical systems: a transition plan for research to reality.

    PubMed

    Park, Sungmee; Jayaraman, Sundaresan

    2010-01-01

    The field of smart textile-based wearable biomedical systems (ST-WBSs) has of late been generating a lot of interest in the research and business communities since its early beginnings in the mid-nineties. However, the technology is yet to enter the marketplace and realize its original goal of enhancing the quality of life for individuals through enhanced real-time biomedical monitoring. In this paper, we propose a framework for analyzing the transition of ST-WBS from research to reality. We begin with a look at the evolution of the field and describe the major components of an ST-WBS. We then analyze the key issues encompassing the technical, medical, economic, public policy, and business facets from the viewpoints of various stakeholders in the continuum. We conclude with a plan of action for transitioning ST-WBS from "research to reality."

  4. A corrosion control manual for rail rapid transit

    NASA Technical Reports Server (NTRS)

    Gilbert, L. O.; Fitzgerald, J. F., II; Menke, J. T.

    1982-01-01

    In 1979, during the planning stage of the Metropolitan Dade County Transit System, the need was expressed for a corrosion control manual oriented to urban rapid transit system use. This manual responds to that need. The objective of the manual is to aid rail rapid transit agencies by providing practical solutions to selected corrosion problems. The scope of the manual encompasses corrosion problems of the facilities of rapid transit systems: structures and tracks, platforms and stations, power and signals, and cars. It also discusses stray electric current corrosion. Both design and maintenance solutions are provided for each problem. Also included are descriptions of the types of corrosion and their causes, descriptions of rapid transit properties, a list of corrosion control committees and NASA, DOD, and ASTM specifications and design criteria to which reference is made in the manual. A bibliography of papers and excerpts of reports and a glossary of frequency used terms are provided.

  5. Program Manager: Journal of the Defense Systems Management College. Volume 19, Number 5, September-October 1990

    DTIC Science & Technology

    1990-10-01

    International Defense Cooperation Agreements; Quality Force Deployment; How Contractors See Systems Acquisition; DOD Metric Transition Plans and Actions; Proposals for Innovation In Service Quality . (sdw)

  6. National Airspace System : status of wide area augmentation system project

    DOT National Transportation Integrated Search

    1998-04-30

    As a key element of its overall program for modernizing the National Airspace : System, the Federal Aviation Administration (FAA) is planning a transition from : ground- to satellite-based navigation by using satellite signals generated by : the Depa...

  7. Walking associated with public transit: moving toward increased physical activity in the United States.

    PubMed

    Freeland, Amy L; Banerjee, Shailendra N; Dannenberg, Andrew L; Wendel, Arthur M

    2013-03-01

    We assessed changes in transit-associated walking in the United States from 2001 to 2009 and documented their importance to public health. We examined transit walk times using the National Household Travel Survey, a telephone survey administered by the US Department of Transportation to examine travel behavior in the United States. People are more likely to transit walk if they are from lower income households, are non-White, and live in large urban areas with access to rail systems. Transit walkers in large urban areas with a rail system were 72% more likely to transit walk 30 minutes or more per day than were those without a rail system. From 2001 to 2009, the estimated number of transit walkers rose from 7.5 million to 9.6 million (a 28% increase); those whose transit-associated walking time was 30 minutes or more increased from approximately 2.6 million to 3.4 million (a 31% increase). Transit walking contributes to meeting physical activity recommendations. Study results may contribute to transportation-related health impact assessment studies evaluating the impact of proposed transit systems on physical activity, potentially influencing transportation planning decisions.

  8. Life Span Transitions for a Student with LD: Mother-Daughter Perspectives

    ERIC Educational Resources Information Center

    Cumming, Therese M.; Smedley, Emily N.

    2017-01-01

    Transition planning and processes can greatly influence the quality of schooling transitions for students with learning disabilities. Student-focused planning and family involvement are two integral components of transition planning that do not always receive the emphasis that they deserve. The educational transitions of one student are examined…

  9. Systems engineering management plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2010-12-01

    The purpose of the Dallas ICM System is to implement a multi-modal operations decision support tool enabled by real-time data pertaining to the operation of freeways, arterials, and public transit. The system will be shared between information system...

  10. Two-Year Transitional Plan. State of Minnesota Developmental Disabilities. October 1, 1989-September 30, 1991. Accountability.

    ERIC Educational Resources Information Center

    Minnesota State Planning Agency, St. Paul.

    The Minnesota 2-year state plan presents a review of the existing service delivery system for: (1) the provision of services to persons with developmental disabilities and their families; (2) a continuing response to priority areas specified in federal legislation; and (3) development of a work plan leading toward development of a Three-Year State…

  11. Plans for Follow-Up Observations of Kepler Planet Candidates

    NASA Astrophysics Data System (ADS)

    Gautier, Thomas N., III

    2009-05-01

    Ground based follow-up observations of transiting planet candidates identified by Kepler are pursued to identify false positives and to search for non-transiting planets in the systems of true transiting planets. I will describe the observational protocols developed by the Kepler team and the web based infrastructure we are using to support the observations. The current state of the Kepler follow-up observations will be reported.

  12. The Circle of Courage[TM] in Transition Planning

    ERIC Educational Resources Information Center

    Espiner, Deborah; Guild, Diane

    2011-01-01

    Young people with learning and behaviour disabilities often leave school without transition planning. When planning does occur, there is generally a discrepancy between the goals of students, parents, and professionals. Students requiring higher levels of support may not even be included in the planning process and transition plans are often…

  13. An Expert System For Multispectral Threat Assessment And Response

    NASA Astrophysics Data System (ADS)

    Steinberg, Alan N.

    1987-05-01

    A concept has been defined for an automatic system to manage the self-defense of a combat aircraft. Distinctive new features of this concept include: a. the flexible prioritization of tasks and coordinated use of sensor, countermeasures, flight systems and weapons assets by means of an automated planning function; b. the integration of state-of-the-art data fusion algorithms with event prediction processing; c. the use of advanced Artificial Intelligence tools to emulate the decision processes of tactical EW experts. Threat Assessment functions (a) estimate threat identity, lethality and intent on the basis of multi-spectral sensor data, and (b) predict the time to critical events in threat engagements (e.g., target acquisition, tracking, weapon launch, impact). Response Management functions (a) select candidate responses to reported threat situations; (b) estimate the effects of candidate actions on survival; and (c) coordinate the assignment of sensors, weapons and countermeasures with the flight plan. The system employs Finite State Models to represent current engagements and to predict subsequent events. Each state in a model is associated with a set of observable features, allowing interpretation of sensor data and adaptive use of sensor assets. Defined conditions on state transitions allow prediction of times to critical future states and are used in planning self-defensive responses, which are designed either to impede a particular state transition or to force a transition to a lower threat state.

  14. Fluor Hanford (FH) River Corridor Transition Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MCBRIDE, D.J.

    2002-08-28

    This Transition Plan defines the scope and schedule for actions that are critical for a smooth transition of the River Corridor scope of work and to ensure the achievement of transition as planned, with minimal or no impact to ongoing baseline activities.

  15. Inventory & analysis of Advanced Public Transportation Systems in Florida

    DOT National Transportation Integrated Search

    2001-09-01

    Through its National Center for Transit Research, and under contract with the Florida Department of Transportation, the Center for Urban Transportation Research has conducted an inventory of current and planned Advanced Public Transportation Systems ...

  16. Multi-modal trip planning system : Northeastern Illinois Regional Transportation Authority.

    DOT National Transportation Integrated Search

    2013-01-01

    This report evaluates the Multi-Modal Trip Planner System (MMTPS) implemented by the Northeastern Illinois Regional Transportation Authority (RTA) against the specific functional objectives enumerated by the Federal Transit Administration (FTA) in it...

  17. 76 FR 17470 - Notice of Transportation Services' Transition From Paper to Electronic Fare Media

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ...] Notice of Transportation Services' Transition From Paper to Electronic Fare Media AGENCY: Office of the... planning to shift to electronic fare media in particular areas, beginning in New York and parts of the... to electronic fare media; thus, compelling the shift from a paper based system (vouchers) to an...

  18. Predictors of Supported Employment for Transitioning Youth with Developmental Disabilities

    ERIC Educational Resources Information Center

    Simonsen, Monica Lynn

    2010-01-01

    The Individuals with Disabilities Education Act of 2004 requires school systems to plan systematically for the transition from school to post-secondary education and/or employment and include measurable post-school goals in students' IEPs. Schools are required to coordinate activities, such as work experiences, to assist students in meeting their…

  19. 41 CFR 101-4.230 - Transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 2 2010-07-01 2010-07-01 true Transition plans. 101-4... plans. (a) Submission of plans. An institution to which § 101-4.225 applies and that is composed of more than one administratively separate unit may submit either a single transition plan applicable to all...

  20. Northeast Florida rural transit intelligent transportation system (ITS) : evaluation plan

    DOT National Transportation Integrated Search

    2001-05-01

    The Northeast Florida Rural Transportation Intelligent Transportation System (ITS) project is a demonstration of ITS deployment in five rural Community Transportation Coordinator (CTC) agencies. The objective of the project is to test and evaluate th...

  1. Development of a Flexible Computerized Management Infrastructure for a Commercial Nuclear Power Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ali, Syed Firasat; Hajek, Brian K.; Usman, Shoaib

    The report emphasizes smooth transition from paper-based procedure systems (PBPSs) to computer-based procedure systems (CBPSs) for the existing commercial nuclear power plants in the U.S. The expected advantages and of the transition are mentioned including continued, safe and efficient operation of the plants under their recently acquired or desired extended licenses. The report proposes a three-stage survey to aid in developing a national strategic plan for the transition from PBPSs to CBPSs. It also includes a comprehensive questionnaire that can be readily used for the first stage of the suggested survey.

  2. Dynamic Testing of the NASA Hypersonic Project Combined Cycle Engine Testbed for Mode Transition Experiments

    NASA Technical Reports Server (NTRS)

    2011-01-01

    NASA is interested in developing technology that leads to more routine, safe, and affordable access to space. Access to space using airbreathing propulsion systems has potential to meet these objectives based on Airbreathing Access to Space (AAS) system studies. To this end, the NASA Fundamental Aeronautics Program (FAP) Hypersonic Project is conducting fundamental research on a Turbine Based Combined Cycle (TBCC) propulsion system. The TBCC being studied considers a dual flow-path inlet system. One flow-path includes variable geometry to regulate airflow to a turbine engine cycle. The turbine cycle provides propulsion from take-off to supersonic flight. The second flow-path supports a dual-mode scramjet (DMSJ) cycle which would be initiated at supersonic speed to further accelerate the vehicle to hypersonic speed. For a TBCC propulsion system to accelerate a vehicle from supersonic to hypersonic speed, a critical enabling technology is the ability to safely and effectively transition from the turbine to the DMSJ-referred to as mode transition. To experimentally test methods of mode transition, a Combined Cycle Engine (CCE) Large-scale Inlet testbed was designed with two flow paths-a low speed flow-path sized for a turbine cycle and a high speed flow-path designed for a DMSJ. This testbed system is identified as the CCE Large-Scale Inlet for Mode Transition studies (CCE-LIMX). The test plan for the CCE-LIMX in the NASA Glenn Research Center (GRC) 10- by 10-ft Supersonic Wind Tunnel (10x10 SWT) is segmented into multiple phases. The first phase is a matrix of inlet characterization (IC) tests to evaluate the inlet performance and establish the mode transition schedule. The second phase is a matrix of dynamic system identification (SysID) experiments designed to support closed-loop control development at mode transition schedule operating points for the CCE-LIMX. The third phase includes a direct demonstration of controlled mode transition using a closed loop control system developed with the data obtained from the first two phases. Plans for a fourth phase include mode transition experiments with a turbine engine. This paper, focusing on the first two phases of experiments, presents developed operational and analysis tools for streamlined testing and data reduction procedures.

  3. The Global Polio Eradication Initiative: Progress, Lessons Learned, And Polio Legacy Transition Planning.

    PubMed

    Cochi, Stephen L; Hegg, Lea; Kaur, Anjali; Pandak, Carol; Jafari, Hamid

    2016-02-01

    The world is closer than ever to achieving global polio eradication, with record-low polio cases in 2015 and the impending prospect of a polio-free Africa. Tens of millions of volunteers, social mobilizers, and health workers have participated in the Global Polio Eradication Initiative. The program contributes to efforts to deliver other health benefits, including health systems strengthening. As the initiative nears completion after more than twenty-five years, it becomes critical to document and transition the knowledge, lessons learned, assets, and infrastructure accumulated by the initiative to address other health goals and priorities. The primary goals of this process, known as polio legacy transition planning, are both to protect a polio-free world and to ensure that investments in polio eradication will contribute to other health goals after polio is completely eradicated. The initiative is engaged in an extensive transition process of consultations and planning at the global, regional, and country levels. A successful completion of this process will result in a well-planned and -managed conclusion of the initiative that will secure the global public good gained by ending one of the world's most devastating diseases and ensure that these investments provide public health benefits for years to come. Project HOPE—The People-to-People Health Foundation, Inc.

  4. Effect of Transition Planning on Postsecondary Support Receipt by Students with Disabilities

    ERIC Educational Resources Information Center

    Newman, Lynn A; Madaus, Joseph W.; Javitz, Harold S.

    2016-01-01

    Data from the National Longitudinal Transition Study-2 were analyzed to determine the effect of receiving transition planning education and having a transition plan that specified needed postsecondary accommodations on the receipt of disability-specific services and generally available supports at the postsecondary level by students with…

  5. Hypersonic Boundary-Layer Transition for X-33 Phase 2 Vehicle

    NASA Technical Reports Server (NTRS)

    Thompson, Richard A.; Hamilton, Harris H., II; Berry, Scott A.; Horvath, Thomas J.; Nowak, Robert J.

    1998-01-01

    A status review of the experimental and computational work performed to support the X-33 program in the area of hypersonic boundary-layer transition is presented. Global transition fronts are visualized using thermographic phosphor measurements. Results are used to derive transition correlations for "smooth body" and discrete roughness data and a computational tool is developed to predict transition onset for X-33 using these results. The X-33 thermal protection system appears to be conservatively designed for transition effects based on these studies. Additional study is needed to address concerns related to surface waviness. A discussion of future test plans is included.

  6. Planning for transit-supportive development : a practitioner's guide, executive summary.

    DOT National Transportation Integrated Search

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  7. Modeling the Oil Transition: A Summary of the Proceedings of the DOE/EPA Workshop on the Economic and Environmental Implications of Global Energy Transitions

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Greene, David L

    2007-02-01

    The global energy system faces sweeping changes in the next few decades, with potentially critical implications for the global economy and the global environment. It is important that global institutions have the tools necessary to predict, analyze and plan for such massive change. This report summarizes the proceedings of an international workshop concerning methods of forecasting, analyzing, and planning for global energy transitions and their economic and environmental consequences. A specific case, it focused on the transition from conventional to unconventional oil and other energy sources likely to result from a peak in non-OPEC and/or global production of conventional oil.more » Leading energy models from around the world in government, academia and the private sector met, reviewed the state-of-the-art of global energy modeling and evaluated its ability to analyze and predict large-scale energy transitions.« less

  8. 15 CFR 1170.4 - Guidelines.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... agency shall: (a) Establish plans and dates for use of the metric system in procurements, grants and... barriers to transition to the metric system; (f) Consider cost effects of metric use in setting agency... metric system of measurement through educational information and guidance and in agency publications; (i...

  9. 15 CFR 1170.4 - Guidelines.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... agency shall: (a) Establish plans and dates for use of the metric system in procurements, grants and... barriers to transition to the metric system; (f) Consider cost effects of metric use in setting agency... metric system of measurement through educational information and guidance and in agency publications; (i...

  10. 15 CFR 1170.4 - Guidelines.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... agency shall: (a) Establish plans and dates for use of the metric system in procurements, grants and... barriers to transition to the metric system; (f) Consider cost effects of metric use in setting agency... metric system of measurement through educational information and guidance and in agency publications; (i...

  11. 49 CFR 659.15 - System safety program standard.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... included in the affected rail transit agency's system safety program plan relating to the hazard management... 49 Transportation 7 2011-10-01 2011-10-01 false System safety program standard. 659.15 Section 659... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the...

  12. 14 CFR 1253.230 - Transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 5 2010-01-01 2010-01-01 false Transition plans. 1253.230 Section 1253.230... EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Coverage § 1253.230 Transition plans. (a) Submission of plans. An institution to which § 1253.225 applies and that is composed of more than...

  13. 49 CFR 25.230 - Transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Transition plans. 25.230 Section 25.230... PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Coverage § 25.230 Transition plans. (a) Submission of plans. An institution to which § 25.225 applies and that is composed of more than one...

  14. 6 CFR 17.230 - Transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 6 Domestic Security 1 2010-01-01 2010-01-01 false Transition plans. 17.230 Section 17.230 Domestic... EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Coverage § 17.230 Transition plans. (a) Submission of plans. An institution to which § 17.225 applies and that is composed of more than...

  15. A patient-centered longitudinal care plan: vision versus reality

    PubMed Central

    Dykes, Patricia C; Samal, Lipika; Donahue, Moreen; Greenberg, Jeffrey O; Hurley, Ann C; Hasan, Omar; O'Malley, Terrance A; Venkatesh, Arjun K; Volk, Lynn A; Bates, David W

    2014-01-01

    Objective As healthcare systems and providers move toward meaningful use of electronic health records, longitudinal care plans (LCPs) may provide a means to improve communication and coordination as patients transition across settings. The objective of this study was to determine the current state of communication of LCPs across settings and levels of care. Materials and methods We conducted surveys and interviews with professionals from emergency departments, acute care hospitals, skilled nursing facilities, and home health agency settings in six regions in the USA. We coded the transcripts according to the Agency for Healthcare Research and Quality (AHRQ) ‘Broad Approaches’ to care coordination to understand the degree to which current practice meets the definition of an LCP. Results Participants (n=22) from all settings reported that LCPs do not exist in their current state. We found LCPs in practice, and none of these were shared or reconciled across settings. Moreover, we found wide variation in the types and formats of care plan information that was communicated as patients transitioned. The most common formats, even when care plan information was communicated within the same healthcare system, were paper and fax. Discussion These findings have implications for data reuse, interoperability, and achieving widespread adoption of LCPs. Conclusions The use of LCPs to support care transitions is suboptimal. Strategies are needed to transform the LCP from vision to reality. PMID:24996874

  16. Enabling cost-effective multimodal trip planners through open transit data : [summary].

    DOT National Transportation Integrated Search

    2011-01-01

    Electronic navigation systems are now common : and widely used -- via Internet services, handheld : devices, and devices in vehicles -- to guide drivers : using instructions and maps. Next generation : systems will plan trips by other modes, includin...

  17. Planning for transit-supportive development : a practitioner's guide. Section 1 : introduction.

    DOT National Transportation Integrated Search

    2014-06-01

    Planning for Transit-Supportive Development: A Practitioners Guide is a toolkit of practical and innovative measures to help : Metropolitan Planning Organizations (MPOs), regional planners, transit agencies, and local government elected o...

  18. Considerations in the Design of Follow-Up and Follow-Along Systems for Improving Transition Programs and Services.

    ERIC Educational Resources Information Center

    Johnson, David R.

    1993-01-01

    This paper examines the qualities and limitations of information utilization in special education program planning and improvement; discusses the results of a federally funded transition follow-along and follow-up research and demonstration project in Minnesota; and describes methods for organizing, managing, and reporting follow-along and…

  19. Incorporating the Six Core Elements of Health Care Transition Into a Medicaid Managed Care Plan: Lessons Learned From a Pilot Project.

    PubMed

    McManus, Margaret; White, Patience; Pirtle, Robin; Hancock, Catina; Ablan, Michael; Corona-Parra, Raquel

    2015-01-01

    This pediatric-to-adult health care transition pilot project describes the process and results of incorporating the "Six Core Elements of Health Care Transition (2.0)" into a Medicaid managed care plan with a group of 35 18-23 year olds who have chronic mental health, developmental, and complex medical conditions. The pilot project demonstrated an effective approach for customizing and delivering recommended transition services. At the start of the 18-month project, the Medicaid plan was at the basic level (1) of transition implementation of the Six Core Elements with no transition policy, member transition readiness assessment results, health care transition plans of care, updated medical summaries, transfer package for the adult-focused provider, and assurance of transfer completion and consumer feedback. At the conclusion of the pilot project, the plan scored at level 3 on each core element. The primary reason for not scoring at the highest level (4) was because the transition elements have not been incorporated into services for all enrollees within the plan. Future efforts in managed care will benefit from starting the transition process much earlier (ages 12-14), expanding the role of nurse care managers and participating pediatric and adult-focused clinicians in transition, and offering payment incentives to clinicians to implement the Six Core Elements of Health Care Transition. Copyright © 2015 Elsevier Inc. All rights reserved.

  20. 78 FR 67212 - Notice of Meeting of the Transit Rail Advisory Committee for Safety (TRACS)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-08

    ... the safety of public transportation systems. DATES: The TRACS meeting will be held on November 21... Letter Report on the Development of the National Public Transportation Safety Plan (4) Review of the Draft Letter Report on Public Transportation Agency Plans (5) Public Comments (6) Wrap Up As previously...

  1. Handling the Transfer to Secondary School

    ERIC Educational Resources Information Center

    Bull, Elaine

    2008-01-01

    The transfer to secondary education can be an anxious time and planning ahead can help. This article offers practical advice about what to consider, when to start planning and discusses many of the issues involved in the transition to later schooling. Written from the perspective of the English school system, many of the issues and principles are…

  2. Advanced software development workstation: Object-oriented methodologies and applications for flight planning and mission operations

    NASA Technical Reports Server (NTRS)

    Izygon, Michel

    1993-01-01

    The work accomplished during the past nine months in order to help three different organizations involved in Flight Planning and in Mission Operations systems, to transition to Object-Oriented Technology, by adopting one of the currently most widely used Object-Oriented analysis and Design Methodology is summarized.

  3. 49 CFR 659.11 - Confidentiality of investigation reports and security plans.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Confidentiality of investigation reports and security plans. 659.11 Section 659.11 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION RAIL FIXED GUIDEWAY SYSTEMS; STATE SAFETY OVERSIGHT Role of the State § 659.11...

  4. Transition Goals for Youth with Social, Emotional, and Behavioral Problems: Parent and Student Knowledge

    ERIC Educational Resources Information Center

    Harrison, Judith R.; State, Talida M.; Wills, Howard P.; Custer, Beth A.; Miller, Elaine

    2017-01-01

    Transition planning is a mandated component of individualized education plans (IEPs) designed to ensure successful transition to adult life for students with disabilities. Students with social, emotional, and behavioral (SEB) needs experience poor post-school outcomes, suggesting a need for more effective transition planning. This study evaluated…

  5. Essentials of Transition Planning. Brookes Transition to Adulthood Series

    ERIC Educational Resources Information Center

    Wehman, Paul

    2011-01-01

    For young people with disabilities, crossing the bridge to adulthood will be empowering instead of intimidating--when their support teams know the essentials of effective transition planning. Now all the fundamentals of well-crafted transition plans are collected in one concise quick-guide, straight from one of the top authorities on helping young…

  6. Factors Related to Successful Transition Planning for Adolescents on the Autism Spectrum

    ERIC Educational Resources Information Center

    Hatfield, Megan; Ciccarelli, Marina; Falkmer, Torbjörn; Falkmer, Marita

    2018-01-01

    Adolescents on the autism spectrum often have difficulties with the transition from high school to post-school activities. Despite this, little is known about the transition planning processes for this group. This study explored predisposing, reinforcing and enabling factors related to the transition planning processes for adolescents on the…

  7. Independent Living Transition Assistance for Young Adults Who Have Special Needs

    ERIC Educational Resources Information Center

    Russell, Rhonda L.

    2016-01-01

    This research focused on young adults who have disabilities and their transition and career planning for post-secondary life. The study sought to identify best practices in transition planning, transition planning services, and to determine the types of resources and support needed by young adults who have disabilities. For youth who have…

  8. Laser transit anemometer measurements on a slender cone in the Langley unitary plan wind tunnel

    NASA Technical Reports Server (NTRS)

    Humphreys, William M., Jr.; Hunter, William W., Jr.; Covell, Peter F.; Nichols, Cecil E., Jr.

    1990-01-01

    A laser transit anemometer (LTA) system was used to probe the boundary layer on a slender (5 degree half angle) cone model in the Langley unitary plan wind tunnel. The anemometer system utilized a pair of laser beams with a diameter of 40 micrometers spaced 1230 micrometers apart to measure the transit times of ensembles of seeding particles using a cross-correlation technique. From these measurements, boundary layer profiles around the model were constructed and compared with CFD calculations. The measured boundary layer profiles representing the boundary layer velocity normalized to the edge velocity as a function of height above the model surface were collected with the model at zero angle of attack for four different flow conditions, and were collected in a vertical plane that bisected the model's longitudinal center line at a location 635 mm from the tip of the forebody cone. The results indicate an excellent ability of the LTA system to make velocity measurements deep into the boundary layer. However, because of disturbances in the flow field caused by onboard seeding, premature transition occurred implying that upstream seeding is mandatory if model flow field integrity is to be maintained. A description and results of the flow field surveys are presented.

  9. The U.S. Federal Radionavigation Plan

    NASA Astrophysics Data System (ADS)

    Shirer, Heywood O.

    The author presents an overview of the 1990 Federal Radionavigation Plan (FRP) policy and a discussion of the status of GPS (Global Positioning System), Loran-C, Omega, VOR/DME (VHF omnidirectional range/distance measuring equipment), VORTAC, TACAN, MLS (Microwave Landing System), ILS (instrument landing systems), Transit, and radiobeacons. The 1990 FRP contains significant changes regarding several of the radionavigation systems. It is concluded that it is difficult at best to ascertain the post-GPS final systems mix of federally provided radionavigation systems. The phase-out dates of other systems in favor of GPS still remain soft. Many uncertainties remain until the capabilities of GPS are verified for all classes of users. The federal radionavigation planning process accommodates such uncertainties, keeping pace with the constantly changing radionavigation user profile and rapid advancements in system technology.

  10. Transition Planning for Foster Youth

    ERIC Educational Resources Information Center

    Geenen, Sarah J.; Powers, Laurie E.

    2006-01-01

    The study evaluated the IEPs/Individualized Transition Plans of 45 students who were in special education and foster care, and compared them to the plans of 45 students who were in special education only. Results indicate that the transition plans of foster youth with disabilities were poor in quality, both in absolute terms and in comparison to…

  11. Extended System Operations Studies for Automated Guideway Transit Systems : Plan for Task 5--DPM Failure Management

    DOT National Transportation Integrated Search

    1981-06-01

    The purpose of Task 5 in the Extended System Operations Studies Project, DPM Failure Management, is to enhance the capabilities of the Downtown People Mover Simulation (DPMS) and the Discrete Event Simulation Model (DESM) by increasing the failure mo...

  12. Transit planning and research reports : an annotated bibliography

    DOT National Transportation Integrated Search

    1995-08-01

    This is the third edition of the Transit Planning and Research Reports: An Annotated Bibliography. It references the most current and available planning and research reports published as of August 1995 and sponsored by the Federal Transit Administrat...

  13. Transits of Venus and Mercury: Exoplanet Analogs in Our Solar System

    NASA Astrophysics Data System (ADS)

    Pasachoff, Jay M.

    2012-05-01

    Since Johannes Kepler's predictions of transits of Mercury and Venus in 1631, and observations by Jeremiah Horrocks and William Crabtree of the 1639 transit of Venus, only 5 other transits of Venus have been observed: in 1761 and 1769, 1874 and 1882, and 2004. Expeditions were sent all over the world for the 18th and 19th century transits to follow the methods of Halley and others to determine the Astronomical Unit, giving the size and scale of the solar system, arguably the most important problem in astronomy for centuries. I will discuss how the infamous black-drop effect bedeviled astronomers in that quest for an accurate A.U., and how Glenn Schneider and I explained the effect through satellite observations of transits of Mercury, showing that it was not simply caused by the Cytherean atmosphere. During the 2004 transit, we worked with Richard Willson of ACRIMsat to detect the 0.1% drop in the Total Solar Irradiance, showing the effect of solar limb darkening, positioning such observations of transits of Venus and of Mercury as analogs to exoplanet transits. Our observations of the atmosphere of Venus with NASA's Transition Region and Coronal Explorer in 2004 led us to plan extensive observations of Venus's atmosphere and other phenomena during the June 5, 2012, transit of Venus, the last to be visible from Earth until 2117. We will have used NASA's Solar Dynamics Observatory, Hinode, ACRIMsat, and other spacecraft, and ground-based solar telescopes at Sacramento Peak, Kitt Peak, Big Bear, and Haleakala to observe the transit; I hope to give preliminary reports on these observations during this talk. Further, I will discuss the plans of Ehrenreich and colleagues for Hubble observations of this transit and our hopes of detecting transits of Venus and Earth as seen from Jupiter and Saturn over the next few years.

  14. Ventura County fare integration : a case study : promoting seamless regional fare coordination

    DOT National Transportation Integrated Search

    2001-09-01

    This report details the approach taken in one specific region to plan, operate, and maintain a multi-agency, transit fare collection payment system demonstration utilizing smart card technology as well as other ITS (intelligent transportation systems...

  15. Results, Knowledge, and Attitudes Regarding an Incentive Compensation Plan in a Hospital-Based, Academic, Employed Physician Multispecialty Group.

    PubMed

    Dolan, Robert W; Nesto, Richard; Ellender, Stacey; Luccessi, Christopher

    Hospitals and healthcare systems are introducing incentive metrics into compensation plans that align with value-based payment methodologies. These incentive measures should be considered a practical application of the transition from volume to value and will likely replace traditional productivity-based compensation in the future. During the transition, there will be provider resistance and implementation challenges. This article examines a large multispecialty group's experience with a newly implemented incentive compensation plan including the structure of the plan, formulas for calculation of the payments, the mix of quality and productivity metrics, and metric threshold achievement. Three rounds of surveys with comments were collected to measure knowledge and attitudes regarding the plan. Lessons learned and specific recommendations for success are described. The participant's knowledge and attitudes regarding the plan are important considerations and affect morale and engagement. Significant provider dissatisfaction with the plan was found. Careful metric selection, design, and management are critical activities that will facilitate provider acceptance and support. Improvements in data collection and reporting will be needed to produce reliable metrics that can supplant traditional volume-based productivity measures.

  16. Transition Planning for Youth with Special Health Care Needs (YSHCN) in Illinois Schools

    ERIC Educational Resources Information Center

    Bargeron, Jodie; Contri, Darcy; Gibbons, Linda J.; Ruch-Ross, Holly S.; Sanabria, Kathy

    2015-01-01

    "Transition Planning for Youth with Special Health Care Needs (YSHCN)" chronicles the research and work completed by agencies in Illinois to provide examples of best practice in transition planning. Increasing numbers of YSHCN survive into adulthood creating a need for focus on the transition to adult life for these young people,…

  17. Providing Transition Planning for the Secondary Student through the Community Based Inservice Model.

    ERIC Educational Resources Information Center

    Glasenapp, Gary

    This paper provides an overview of the transition process for students with severe handicaps. For secondary age youths with severe handicaps, explicit and intensive transition planning is necessary to bridge the gap between school experiences and adult life. The transition planning process is designed to build the skills necessary for an…

  18. Exploring Asperger's Syndrome, Schlossberg's Transition Theory and Federally Mandated Transition Planning: Seeking Improvements

    ERIC Educational Resources Information Center

    Spencer, Tracy Lynne Wright Lyons

    2013-01-01

    Federally mandated transition planning has done little to improve the postsecondary outcomes of people with Asperger's syndrome. Current high school transition planning for students with Asperger's attempts to address some of these areas through family involvement, community inclusion, and the active participation of the student in…

  19. Transit development plan for the Yuma regional area

    DOT National Transportation Integrated Search

    1993-12-16

    The purpose of this Transit Development Pan (TDP) is to indicate how transit could be implemented in the Yuma area, if and when, the local agencies decide to initiate public transit and utilize Federal Transit Administration (FTA) funds. The Plan dem...

  20. Health system strengthening in Cambodia-a case study of health policy response to social transition.

    PubMed

    Grundy, John; Khut, Qiu Yi; Oum, Sophal; Annear, Peter; Ky, Veng

    2009-10-01

    Cambodia, following decades of civil conflict and social and economic transition, has in the last 10 years developed health policy innovations in the areas of health contracting, health financing and health planning. This paper aims to outline recent social, epidemiological and demographic health trends in Cambodia, and on the basis of this outline, to analyse and discuss these policy responses to social transition. Sources of information included a literature review, participant observation in health planning development in Cambodia between 1993 and 2008, and comparative analysis of demographic health surveys between 2000 and 2005. In Cambodia there have been sharp but unequal improvements in child mortality, and persisting high maternal mortality rates. Data analysis demonstrates associations between location, education level and access to facility based care, suggesting the dominant role of socio-economic factors in determining access to facility based health care. These events are taking place against a background of rapid social transition in Cambodian history, including processes of decentralization, privatization and the development of open market economic systems. Primary policy responses of the Ministry of Health to social transition and associated health inequities include the establishment of health contracting, hospital health equity funds and public-private collaborations. Despite the internationally recognized health policy flexibility and innovation demonstrated in Cambodia, policy response still lags well behind the reality of social transition. In order to minimize the delay between transition and response, new policy making tactics are required in order to provide more flexible and timely responses to the ongoing social transition and its impacts on population health needs in the lowest socio-economic quintiles.

  1. Short-range transit planning : current practice and a proposed framework

    DOT National Transportation Integrated Search

    1984-06-01

    The research described in this report explored the service and operations : planning process in the transit industry in a two-phase approach. In the first : phase a detailed assessment of current short range transit planning practice was : undertaken...

  2. Promoting Post-School Success for All: The Role of Collaboration in Person-Centered Transition Planning

    ERIC Educational Resources Information Center

    Michaels, Craig A.; Ferrara, Denise L.

    2006-01-01

    Successful collaboration and problem solving are the foundational processes on which meaningful transition plans are constructed. This article discusses the process of planning for the transition from school to adult life for students with disabilities and suggests that person-centered planning is an ideal vehicle for promoting collaboration and…

  3. Transition Plan For the Technology Demonstration of the Joint Network Defence and Management System (JNDMS)

    DTIC Science & Technology

    2009-11-01

    Technology Demonstration of the Joint Network Defence and Management System (JNDMS) Brett Trask; Novembre 2009. Dès le départ, nous avons mis au point le... 13 5.1 System Specification... 13 5.1.1 Scope ............................................................................................................. 13 5.2 Security

  4. Task planning with uncertainty for robotic systems. Thesis

    NASA Technical Reports Server (NTRS)

    Cao, Tiehua

    1993-01-01

    In a practical robotic system, it is important to represent and plan sequences of operations and to be able to choose an efficient sequence from them for a specific task. During the generation and execution of task plans, different kinds of uncertainty may occur and erroneous states need to be handled to ensure the efficiency and reliability of the system. An approach to task representation, planning, and error recovery for robotic systems is demonstrated. Our approach to task planning is based on an AND/OR net representation, which is then mapped to a Petri net representation of all feasible geometric states and associated feasibility criteria for net transitions. Task decomposition of robotic assembly plans based on this representation is performed on the Petri net for robotic assembly tasks, and the inheritance of properties of liveness, safeness, and reversibility at all levels of decomposition are explored. This approach provides a framework for robust execution of tasks through the properties of traceability and viability. Uncertainty in robotic systems are modeled by local fuzzy variables, fuzzy marking variables, and global fuzzy variables which are incorporated in fuzzy Petri nets. Analysis of properties and reasoning about uncertainty are investigated using fuzzy reasoning structures built into the net. Two applications of fuzzy Petri nets, robot task sequence planning and sensor-based error recovery, are explored. In the first application, the search space for feasible and complete task sequences with correct precedence relationships is reduced via the use of global fuzzy variables in reasoning about subgoals. In the second application, sensory verification operations are modeled by mutually exclusive transitions to reason about local and global fuzzy variables on-line and automatically select a retry or an alternative error recovery sequence when errors occur. Task sequencing and task execution with error recovery capability for one and multiple soft components in robotic systems are investigated.

  5. District Making "Transition" to Bigger Supply of Schools of Choice

    ERIC Educational Resources Information Center

    Olson, Lynn

    2005-01-01

    This article reports how Philadelphia's new, standardized curriculum is just one component of a larger agenda for secondary education. By 2008, the school system plans to make a transition from about 55 high schools, when Chief Executive Officer Paul G. Vallas took the helm in 2002, to between 70 and 80 smaller ones of choice. As part of the…

  6. Training Educators: Plan for Replicating the Experience

    ERIC Educational Resources Information Center

    Mambetakunov, Ulanbek; Ribaudo, Marina

    2013-01-01

    This paper reports on a short survey and a training course offered to the faculty members of the University of Genova with the aim of driving the users of the university Learning Management System in the transition from Moodle 1.9 to Moodle 2, transition that took place in August 2012. The survey has been administered to lectures and staff to…

  7. 40 CFR 7.75 - Transition plan.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.75 Transition plan. If structural changes to facilities are necessary to make the program or activity accessible to handicapped persons, a recipient must prepare a transition plan. (a...

  8. 40 CFR 7.75 - Transition plan.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.75 Transition plan. If structural changes to facilities are necessary to make the program or activity accessible to handicapped persons, a recipient must prepare a transition plan. (a...

  9. 40 CFR 7.75 - Transition plan.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.75 Transition plan. If structural changes to facilities are necessary to make the program or activity accessible to handicapped persons, a recipient must prepare a transition plan. (a...

  10. 40 CFR 7.75 - Transition plan.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... RECEIVING FEDERAL ASSISTANCE FROM THE ENVIRONMENTAL PROTECTION AGENCY Discrimination Prohibited on the Basis of Handicap § 7.75 Transition plan. If structural changes to facilities are necessary to make the program or activity accessible to handicapped persons, a recipient must prepare a transition plan. (a...

  11. Continuing Vocational Training in the Space Industry: A Siberian Case Study

    ERIC Educational Resources Information Center

    Churlyaeva, Natalya; Kukushkin, Sergey

    2013-01-01

    The development of a continuing vocational training programme at the Information Satellite Systems Joint-Stock Company (ISS JSC) during the transition from the planned Soviet economy to what is now called the Russian market economy is briefly outlined. How the collapse of a planned economy led to the degradation of engineering higher education…

  12. Health manpower planning in Slovenia: a policy analysis of the changes in roles of stakeholders and methodologies.

    PubMed

    Albreht, Tit; Klazinga, Niek

    2002-12-01

    A heightened awareness about medical manpower issues can be observed in countries that are in a state of political, economic, and social transition. Slovenia entered the transition process in 1989 and became an independent country in 1991. Transition and independence influenced its health care in several ways. It changed the health care system and its financing (by introducing a Bismarckian style of social insurance). It then redistributed power from the Ministry of Health to several stakeholders. A major change occurred in the labor market in health care when the flow of health professionals from the newly independent countries greatly decreased. The decrease was partly due to the consequences of the war in the Balkans and partly due to independent labor legislation in Slovenia. Transitional changes brought new stakeholders to the scene, with a resulting redistribution of responsibilities for health manpower policies and the use of various methodologies. This policy analysis offers a detailed description of the contextual framework, quantitative data on medical manpower development, and, most important, interviews with representatives of the key stakeholders and study of relevant policy documents. We conclude that all stakeholders underpin the need for a structured approach toward health manpower planning in the form of a more coherent system of planning, decision making, and control. A compromise on mutual responsibilities between the less dominant Ministry of Health and the two new powerful stakeholders, the Health Insurance Institute of Slovenia and the Medical Chamber of Slovenia, seems necessary.

  13. Map Sensitivity vs. Map Dependency: A Case Study of Subway Maps’ Impact on Passenger Route Choices in Washington DC

    PubMed Central

    Xu, John

    2017-01-01

    This paper addresses the key assumption in behavioral and transportation planning literature that, when people use a transit system more frequently, they become less dependent on and less sensitive to transit maps in their decision-making. Therefore, according to this assumption, map changes are much less impactful to travel decisions of frequent riders than to that of first-time or new passengers. This assumption—though never empirically validated—has been the major hurdle for transit maps to becoming a planning tool to change passengers’ behavior. This paper examines this assumption using the Washington DC metro map as a case study by conducting a route choice experiment between 30 Origin-Destination (O-D) pairs on seven metro map designs. The experiment targets two types of passengers: frequent metro riders through advertisements on a free daily newspaper available at DC metro stations, and general residents in the Washington metropolitan area through Amazon Mechanical Turk, an online crowdsourcing platform. A total of 255 and 371 participants made 2024 and 2960 route choices in the respective experiments. The results show that frequent passengers are in fact more sensitive to subtle changes in map design than general residents who are less likely to be familiar with the metro map and therefore unaffected by map changes presented in the alternative designs. The work disproves the aforementioned assumption and further validates metro maps as an effective planning tool in transit systems. PMID:29068371

  14. Mexico's Regulatory Engagement in Bulk Electric Power System Planning: An Overview of U.S. Practices and Tools

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Neill, Barbara; Hurlbut, David; Pena, Ivonne

    2016-06-01

    Mexico's transition to a modern wholesale power market will place new demands on how regulators evaluate and approve transmission expansion projects. Transmission projects in a modern wholesale market fulfill one of several needs, and utilities, regional transmission organizations, and regulatory authorities in the United States have encountered comparable challenges in their market transitions to ensure projects meeting each type of need can be built. The purpose of this report is to open a window to view that experience. The report examines key practices of different U.S. jurisdictions that have moved from transmission planning to transmission approval, and it focuses onmore » the role of the regulator in supporting a planning process that equitably meets identified needs.« less

  15. 10 CFR 1042.230 - Transition plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Transition plans. 1042.230 Section 1042.230 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Coverage § 1042.230 Transition plans. (a) Submission of...

  16. 10 CFR 1042.230 - Transition plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Transition plans. 1042.230 Section 1042.230 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Coverage § 1042.230 Transition plans. (a) Submission of...

  17. 10 CFR 1042.230 - Transition plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Transition plans. 1042.230 Section 1042.230 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Coverage § 1042.230 Transition plans. (a) Submission of...

  18. 10 CFR 1042.230 - Transition plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Transition plans. 1042.230 Section 1042.230 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Coverage § 1042.230 Transition plans. (a) Submission of...

  19. 10 CFR 1042.230 - Transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Transition plans. 1042.230 Section 1042.230 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Coverage § 1042.230 Transition plans. (a) Submission of...

  20. The Effects of Using the Transition Planning Inventory and a Structured IEP Process as a Transition Planning Intervention on IEP Meeting Outcomes

    ERIC Educational Resources Information Center

    Rehfeldt, Jason D.; Clark, Gary M.; Lee, Steven W.

    2012-01-01

    This study examined two areas. First, the authors looked at whether secondary individualized education program (IEP) teams who used the "Transition Planning Inventory" (TPI) in conjunction with a structured IEP meeting that based discussions and decisions on TPI data as a planning intervention generated significantly more…

  1. 48 CFR 711.002-70 - Metric system waivers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... is impractical or is likely to cause U.S. firms to experience significant inefficiencies or the loss... USAID Metric Transition Plan.) Repetitive purchases of commercially produced and marketed items and...

  2. 28 CFR 54.225 - Educational institutions eligible to submit transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Educational institutions eligible to submit transition plans. 54.225 Section 54.225 Judicial Administration DEPARTMENT OF JUSTICE (CONTINUED... Coverage § 54.225 Educational institutions eligible to submit transition plans. (a) Application. This...

  3. Bicycle parking plan for Miami-Dade Transit : prepared for the Miami-Dade Metropolitan Planning Organization

    DOT National Transportation Integrated Search

    2002-01-01

    The purpose of the Bicycle Parking Plan for Miami-Dade Transit is to develop recommendations for new and improved bicycle parking facilities at Metrorail stations, park-and-ride lots and other transit hubs. In order to develop recommendations for new...

  4. 10 CFR 1042.225 - Educational institutions eligible to submit transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 4 2010-01-01 2010-01-01 false Educational institutions eligible to submit transition plans. 1042.225 Section 1042.225 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION ON... § 1042.225 Educational institutions eligible to submit transition plans. (a) Application. This section...

  5. 10 CFR 1042.225 - Educational institutions eligible to submit transition plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 4 2013-01-01 2013-01-01 false Educational institutions eligible to submit transition plans. 1042.225 Section 1042.225 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION ON... § 1042.225 Educational institutions eligible to submit transition plans. (a) Application. This section...

  6. 10 CFR 1042.225 - Educational institutions eligible to submit transition plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 4 2011-01-01 2011-01-01 false Educational institutions eligible to submit transition plans. 1042.225 Section 1042.225 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION ON... § 1042.225 Educational institutions eligible to submit transition plans. (a) Application. This section...

  7. 10 CFR 1042.225 - Educational institutions eligible to submit transition plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 4 2014-01-01 2014-01-01 false Educational institutions eligible to submit transition plans. 1042.225 Section 1042.225 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION ON... § 1042.225 Educational institutions eligible to submit transition plans. (a) Application. This section...

  8. 10 CFR 1042.225 - Educational institutions eligible to submit transition plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 4 2012-01-01 2012-01-01 false Educational institutions eligible to submit transition plans. 1042.225 Section 1042.225 Energy DEPARTMENT OF ENERGY (GENERAL PROVISIONS) NONDISCRIMINATION ON... § 1042.225 Educational institutions eligible to submit transition plans. (a) Application. This section...

  9. An Overview of Transition Planning for Students Who Are Deafblind.

    PubMed

    Zatta, Mary; McGinnity, Betsy

    2016-01-01

    Children who are deafblind are one of the lowest-incidence yet most diverse groups receiving services mandated by the Individuals With Disabilities Education Improvement Act. Despite this population's diversity, the development of communication skills is critical for all children who are deafblind, and is the foundation on which good transition planning can be built. The authors describe key research findings and other professional literature on transition planning and services guided by the quality of life principle. The role of the individualized education program and case law in transition planning is discussed. Through a person-centered approach to transition planning, a coordinated set of activities designed to support the young adult in moving from school to postschool settings and activities is identified. The authors conclude that effective transition efforts will involve extensive collaboration among school and agency professionals, families, and the young adult who is deafblind.

  10. Los Angeles congestion reduction demonstration (Metro ExpressLanes) program. National evaluation : content analysis test plan.

    DOT National Transportation Integrated Search

    1998-11-01

    This flyer summarizes the identified human factors research needs for integrated in-vehicle systems for transit vehicles, one of five configurations of in-vehicle safety and driver information systems. A complete review of the research needs for all ...

  11. Protected transitional solution to transformational satellite communications

    NASA Astrophysics Data System (ADS)

    Brand, Jerry C.

    2005-06-01

    As the Warfighter progresses into the next generation battlefield, transformational communications become evident as an enabling technology. Satellite communications become even more vital as the battles range over greater non-contiguous spaces. While current satellite communications provide suitable beyond line-of-sight communications and the Transformational Communications Architecture (TCA) sets the stage for sound information exchange, a realizable transition must occur to ensure successful succession to this higher level. This paper addresses the need for a planned escalation to the next generation satellite communications architecture and offers near-term alternatives. Commercial satellite systems continue to enable the Warfighter to reach back to needed information resources, providing a large majority of available bandwidth. Four areas of concentration for transition include encrypted Telemetry, Tracking and Control (or Command) (TT&C), encrypted and covered data, satellite attack detection and protection, and operational mobility. Solution methodologies include directly embedding COMSEC devices in the satellites and terminals, and supplementing existing terminals with suitable equipment and software. Future satellites planned for near-term launches can be adapted to include commercial grade and higher-level secure equipment. Alternately, the expected use of programmable modems (Software Defined Radios (SDR)) enables incorporation of powerful cipher methods approaching military standards as well as waveforms suitable for on-the-move operation. Minimal equipment and software additions on the satellites can provide reasonable attack detection and protection methods in concert with the planned satellite usage. Network management suite modifications enable cohesive incorporation of these protection schemes. Such transitional ideas offer a smooth and planned transition as the TCA takes life.

  12. 10 CFR 5.225 - Educational institutions eligible to submit transition plans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 1 2013-01-01 2013-01-01 false Educational institutions eligible to submit transition plans. 5.225 Section 5.225 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN... institutions eligible to submit transition plans. (a) Application. This section applies to each educational...

  13. 10 CFR 5.225 - Educational institutions eligible to submit transition plans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 1 2014-01-01 2014-01-01 false Educational institutions eligible to submit transition plans. 5.225 Section 5.225 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN... institutions eligible to submit transition plans. (a) Application. This section applies to each educational...

  14. 10 CFR 5.225 - Educational institutions eligible to submit transition plans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 1 2011-01-01 2011-01-01 false Educational institutions eligible to submit transition plans. 5.225 Section 5.225 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN... institutions eligible to submit transition plans. (a) Application. This section applies to each educational...

  15. 10 CFR 5.225 - Educational institutions eligible to submit transition plans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 1 2012-01-01 2012-01-01 false Educational institutions eligible to submit transition plans. 5.225 Section 5.225 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN... institutions eligible to submit transition plans. (a) Application. This section applies to each educational...

  16. 10 CFR 5.225 - Educational institutions eligible to submit transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Educational institutions eligible to submit transition plans. 5.225 Section 5.225 Energy NUCLEAR REGULATORY COMMISSION NONDISCRIMINATION ON THE BASIS OF SEX IN... institutions eligible to submit transition plans. (a) Application. This section applies to each educational...

  17. Occupational Therapists' Beliefs and Involvement with Secondary Transition Planning

    ERIC Educational Resources Information Center

    Mankey, Tina A.

    2011-01-01

    The purpose of the study was to investigate the involvement and beliefs toward possible involvement of occupational therapy in one geographical area of the United States in regard to secondary transition planning for students with disabilities. Secondary transition planning is mandated by federal legislature and occurs while the student is…

  18. 47 CFR 301.200 - Requests to resolve disputes.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... a Federal Entity regarding the execution, timing, or cost of the Transition Plan submitted by the... Transition Plan submitted by a Federal Entity must be raised, in the first instance, with the officer or employee of the Federal Entity identified in the Transition Plan as being responsible for the relocation or...

  19. 47 CFR 301.200 - Requests to resolve disputes.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... a Federal Entity regarding the execution, timing, or cost of the Transition Plan submitted by the... Transition Plan submitted by a Federal Entity must be raised, in the first instance, with the officer or employee of the Federal Entity identified in the Transition Plan as being responsible for the relocation or...

  20. 40 CFR 7.75 - Transition plan.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of Handicap § 7.75 Transition plan. If structural changes to facilities are necessary to make the...) Requirements. The transition plan must set forth the steps needed to complete the structural changes required... the OCR upon request and to the public for inspection at either the site of the project or at the...

  1. 47 CFR 301.120 - Reports on agency Transition Plans.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 5 2014-10-01 2014-10-01 false Reports on agency Transition Plans. 301.120 Section 301.120 Telecommunication NATIONAL TELECOMMUNICATIONS AND INFORMATION ADMINISTRATION, DEPARTMENT OF COMMERCE RELOCATION OF AND SPECTRUM SHARING BY FEDERAL GOVERNMENT STATIONS Technical Panel § 301.120 Reports on agency Transition Plans. (a)...

  2. The Effect of Ship Inherent Controllability on Piloted Performance: The Simulator Experiment

    DTIC Science & Technology

    1990-10-01

    planned analysis that would look for a dependence of the piloted maneuvers on the inherent controllability of the ships, the transit ccnditions and pilot...instructions were planned to sample the maneuvers needed in a narrow channel. Each run was initialized with the ship to the right of the channel...to Navigation Systems Design Manual for Restricted Waterways," (Smith et al., 1985). As of this writing this revision is planned for calendar year 1991

  3. Status of the Combined Cycle Engine Rig

    NASA Technical Reports Server (NTRS)

    Saunders, Dave; Slater, John; Dippold, Vance

    2009-01-01

    Status for the past year is provided of the turbine-based Combined-Cycle Engine (CCE) Rig for the hypersonic project. As part of the first stage propulsion of a two-stage-to-orbit vehicle concept, this engine rig is designed with a common inlet that supplies flow to a turbine engine and a dual-mode ramjet / scramjet engine in an over/under configuration. At Mach 4 the inlet has variable geometry to switch the airflow from the turbine to the ramjet / scramjet engine. This process is known as inlet mode-transition. In addition to investigating inlet aspects of mode transition, the rig will allow testing of turbine and scramjet systems later in the test series. Fully closing the splitter cowl "cocoons" the turbine engine and increases airflow to the scramjet duct. The CCE Rig will be a testbed to investigate integrated propulsion system and controls technology objectives. Four phases of testing are planned to 1) characterize the dual inlet database, 2) collect inlet dynamics using system identification techniques, 3) implement an inlet control to demonstrate mode-transition scenarios and 4) demonstrate integrated inlet/turbine engine operation through mode-transition. Status of the test planning and preparation activities is summarized with background on the inlet design and small-scale testing, analytical CFD predictions and some details of the large-scale hardware. The final stages of fabrication are underway.

  4. AllAboard: Visual Exploration of Cellphone Mobility Data to Optimise Public Transport.

    PubMed

    Di Lorenzo, G; Sbodio, M; Calabrese, F; Berlingerio, M; Pinelli, F; Nair, R

    2016-02-01

    The deep penetration of mobile phones offers cities the ability to opportunistically monitor citizens' mobility and use data-driven insights to better plan and manage services. With large scale data on mobility patterns, operators can move away from the costly, mostly survey based, transportation planning processes, to a more data-centric view, that places the instrumented user at the center of development. In this framework, using mobile phone data to perform transit analysis and optimization represents a new frontier with significant societal impact, especially in developing countries. In this paper we present AllAboard, an intelligent tool that analyses cellphone data to help city authorities in visually exploring urban mobility and optimizing public transport. This is performed within a self contained tool, as opposed to the current solutions which rely on a combination of several distinct tools for analysis, reporting, optimisation and planning. An interactive user interface allows transit operators to visually explore the travel demand in both space and time, correlate it with the transit network, and evaluate the quality of service that a transit network provides to the citizens at very fine grain. Operators can visually test scenarios for transit network improvements, and compare the expected impact on the travellers' experience. The system has been tested using real telecommunication data for the city of Abidjan, Ivory Coast, and evaluated from a data mining, optimisation and user prospective.

  5. ERP System Implementation: An Oil and Gas Exploration Sector Perspective

    NASA Astrophysics Data System (ADS)

    Mishra, Alok; Mishra, Deepti

    Enterprise Resource Planning (ERP) systems provide integration and optimization of various business processes which leads to improved planning and decision quality, smoother coordination between business units resulting in higher efficiency, and quicker response time to customer demands and inquiries. This paper reports challenges, opportunities and outcome of ERP implementation in Oil & Gas exploration sector. This study will facilitate in understanding transition, constraints and implementation of ERP in this sector and also provide guidelines from lessons learned in this regard.

  6. WSTIAC: Weapon Systems Technology Information Analysis Center. Volume 6, Number 1

    DTIC Science & Technology

    2005-01-01

    official documentation. 2 WS"IAE Newslelter Winter 2005 Lobster Robo [s (Continued from page 1) When compared to terrestrial arthropods, underwater...were partially offset by a net during the S&T phase, could help ease the transition to the decrease of planned quantities to be purchased (-$24.4...environment to archive the ly always involves the use of a Test and Evaluation Master development of an entire system, on paper qnd/or elec- Plan (TEMP). Test

  7. PLANNING FOR OPTICAL DISK TECHNOLOGY WITH DIGITAL CARTOGRAPHY.

    USGS Publications Warehouse

    Light, Donald L.

    1984-01-01

    Progress in the computer field continues to suggest that the transition from traditional analog mapping systems to digital systems has become a practical possibility. A major shortfall that still exists in digital systems is the need for very large mass storage capacity. The decade of the 1980's has introduced laser optical disk storage technology, which may be the breakthrough needed for mass storage. This paper addresses system concepts for digital cartography during the transition period. Emphasis is placed on determining U. S. Geological Survey mass storage requirements and introducing laser optical disk technology for handling storage problems for digital data in this decade.

  8. Surviving an SIS Breakup

    ERIC Educational Resources Information Center

    Villano, Matt

    2010-01-01

    Divorcing one student information system and hooking up with another can cause serious upheaval. With the right plan in place, the transition to a new student information system can go surprisingly smoothly. The author interviewed technologists at Southwest Wisconsin Technical College and the Emily Griffith Opportunity School (CO) who recently…

  9. 15 CFR 1170.6 - Reporting requirement.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... transition to the metric system, as well as actions planned for the budget year involved to implement fully the metric system, in accordance with this policy. Reporting shall cease for an agency in the fiscal...) TECHNOLOGY ADMINISTRATION, DEPARTMENT OF COMMERCE METRIC CONVERSION POLICY FOR FEDERAL AGENCIES § 1170.6...

  10. 15 CFR 1170.6 - Reporting requirement.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... transition to the metric system, as well as actions planned for the budget year involved to implement fully the metric system, in accordance with this policy. Reporting shall cease for an agency in the fiscal...) TECHNOLOGY ADMINISTRATION, DEPARTMENT OF COMMERCE METRIC CONVERSION POLICY FOR FEDERAL AGENCIES § 1170.6...

  11. 15 CFR 1170.6 - Reporting requirement.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... transition to the metric system, as well as actions planned for the budget year involved to implement fully the metric system, in accordance with this policy. Reporting shall cease for an agency in the fiscal...) TECHNOLOGY ADMINISTRATION, DEPARTMENT OF COMMERCE METRIC CONVERSION POLICY FOR FEDERAL AGENCIES § 1170.6...

  12. 15 CFR 1170.6 - Reporting requirement.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... transition to the metric system, as well as actions planned for the budget year involved to implement fully the metric system, in accordance with this policy. Reporting shall cease for an agency in the fiscal...) TECHNOLOGY ADMINISTRATION, DEPARTMENT OF COMMERCE METRIC CONVERSION POLICY FOR FEDERAL AGENCIES § 1170.6...

  13. Using the International Space Station (ISS) Oxygen Generation Assembly (OGA) Is Not Feasible for Mars Transit

    NASA Technical Reports Server (NTRS)

    Jones, Harry W.

    2016-01-01

    A review of two papers on improving the International Space Station (ISS) Oxygen Generation Assembly (OGA) shows that it would not save substantial mass on a Mars transit. The ISS OGA requires redesign for satisfactory operation, even for the ISS. The planned improvements of the OGA for ISS would not be sufficient to make it suitable for Mars, because Mars transit life support has significantly different requirements than ISS. The OGA for Mars should have lower mass, better reliability and maintainability, greater safety, radiation hardening, and capability for quiescent operation. NASA's methodical, disciplined systems engineering process should be used to develop the appropriate system.

  14. 5 CFR 330.602 - Agency plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Agency plans. 330.602 Section 330.602... PLACEMENT (GENERAL) Agency Career Transition Assistance Plans (CTAP) for Local Surplus and Displaced Employees § 330.602 Agency plans. (a) Each agency will establish a Career Transition Assistance Plan (CTAP...

  15. An aggregate method to calibrate the reference point of cumulative prospect theory-based route choice model for urban transit network

    NASA Astrophysics Data System (ADS)

    Zhang, Yufeng; Long, Man; Luo, Sida; Bao, Yu; Shen, Hanxia

    2015-12-01

    Transit route choice model is the key technology of public transit systems planning and management. Traditional route choice models are mostly based on expected utility theory which has an evident shortcoming that it cannot accurately portray travelers' subjective route choice behavior for their risk preferences are not taken into consideration. Cumulative prospect theory (CPT), a brand new theory, can be used to describe travelers' decision-making process under the condition of uncertainty of transit supply and risk preferences of multi-type travelers. The method to calibrate the reference point, a key parameter to CPT-based transit route choice model, determines the precision of the model to a great extent. In this paper, a new method is put forward to obtain the value of reference point which combines theoretical calculation and field investigation results. Comparing the proposed method with traditional method, it shows that the new method can promote the quality of CPT-based model by improving the accuracy in simulating travelers' route choice behaviors based on transit trip investigation from Nanjing City, China. The proposed method is of great significance to logical transit planning and management, and to some extent makes up the defect that obtaining the reference point is solely based on qualitative analysis.

  16. Dallas Freeway/HOV system planning study: Year 2015. A summary of recommended hov improvements. Interim research report, September 1992-August 1993

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walters, C.H.; Lomax, T.J.; Poe, C.M.

    1995-07-01

    The Dallas Freeway/High-Occupany Vehicle Lane System Planning Study is a joint project in cooperation with the Texas Department of Transportation (TxDOT), Dallas Area Rapid Transit (DART), the North Central Texas Council of Governments (NCTCOG), and the Texas Transportation Institute (TTI). The intent of this effort is to assist in the development of an area-wide freeway/HOV system that recognizes implementation constraints (right-of-way and construction costs) and provides reasonable peak-hour operating conditions on all freeway facilities, while incorporating the long-range plans developed by TxDOT, DART, and NCTCOG. The proposed system is a set of recommendations to be considered and evaluated as partmore » of the development of the NCTCOG Mobility 2010 Plan Update, the long-range transportation plan for the Dallas area. HOV facilities are a significant part of the recommended system in the Dallas System Planning Study, and their implementation is important to the successful operation of the Dallas area transportation system in the future. The report, therefore, focuses on the recommended HOV improvements from the methodology.« less

  17. Transition Planning for Students with Chronic Health Conditions. Position Statement

    ERIC Educational Resources Information Center

    Baszler, Rita; Rochkes, Laura; Dolatowski, Rosemary; Mendes, Irene; Yow, Barbara; Butler, Sarah; Fekaris, Nina

    2014-01-01

    It is the position of the National Association of School Nurses (NASN) that all children with chronic health conditions should receive coordinated and deliberate transition planning to maximize lifelong functioning and well-being. Transition planning refers to a coordinated set of activities to assist students with chronic health conditions to…

  18. Transition Planning Guide: From School to Adult Life.

    ERIC Educational Resources Information Center

    Thompson, Sandra Jespersen

    The guide is intended to assist disabled students, their families, and professionals working with them to become familiar with the variety of adult services available and to create a systematic plan for transition from school to adult life. The first section considers the logistics of transition planning and includes a description of the planning…

  19. Five Steps for Developing Effective Transition Plans for High School Students with Autism Spectrum Disorder

    ERIC Educational Resources Information Center

    Szidon, Katherine; Ruppar, Andrea; Smith, Leann

    2015-01-01

    The Individuals With Disabilities Education Act (IDEA; 2006) requires schools to develop transition plans for students with disabilities, beginning at age 16, if not before. For students with autism spectrum disorder (ASD), the transition planning process includes unique considerations. This article describes five steps for developing effective…

  20. A Vocational/Special Education Individualized Transitional Planner (School to Work).

    ERIC Educational Resources Information Center

    Youshock, Joseph M.; Gilgannon, Nancy

    This individualized transition plan manual can be used by special and vocational educators in developing a curriculum plan for handicapped or special needs learners based on career goals and job selection. The introductory sections provide a description of the individual transition planning model, an outline of communication skills, and a list of…

  1. A novel method for vaginal cylinder treatment planning: a seamless transition to 3D brachytherapy

    PubMed Central

    Wu, Vincent; Wang, Zhou; Patil, Sachin

    2012-01-01

    Purpose Standard treatment plan libraries are often used to ensure a quick turn-around time for vaginal cylinder treatments. Recently there is increasing interest in transitioning from conventional 2D radiograph based brachytherapy to 3D image based brachytherapy, which has resulted in a substantial increase in treatment planning time and decrease in patient through-put. We describe a novel technique that significantly reduces the treatment planning time for CT-based vaginal cylinder brachytherapy. Material and methods Oncentra MasterPlan TPS allows multiple sets of data points to be classified as applicator points which has been harnessed in this method. The method relies on two hard anchor points: the first dwell position in a catheter and an applicator configuration specific dwell position as the plan origin and a soft anchor point beyond the last active dwell position to define the axis of the catheter. The spatial location of various data points on the applicator's surface and at 5 mm depth are stored in an Excel file that can easily be transferred into a patient CT data set using window operations and then used for treatment planning. The remainder of the treatment planning process remains unaffected. Results The treatment plans generated on the Oncentra MasterPlan TPS using this novel method yielded results comparable to those generated on the Plato TPS using a standard treatment plan library in terms of treatment times, dwell weights and dwell times for a given optimization method and normalization points. Less than 2% difference was noticed between the treatment times generated between both systems. Using the above method, the entire planning process, including CT importing, catheter reconstruction, multiple data point definition, optimization and dose prescription, can be completed in ~5–10 minutes. Conclusion The proposed method allows a smooth and efficient transition to 3D CT based vaginal cylinder brachytherapy planning. PMID:23349650

  2. Supervision strategies for improved reliability of bus routes. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-09-01

    The synthesis will be of interest to transit agency managers and supervisors, as well as to operating and planning personnel who are concerned with the reliability and scheduling of buses. Information is provided on service monitoring, service supervision and control, and supervision strategies. Reliability of transit service is critical to bus transit ridership. The extent of service supervision has an important bearing on reliability. The report describes the various procedures that are used by transit agencies to monitor and maintain bus service reliability. Most transit systems conduct checks of the number of riders at maximum load points and monitor schedulemore » adherence at these locations. Other supervisory actions include service restoration techniques, and strategies such as schedule control, headway control, load control, extraboard management, and personnel selection and training. More sophisticated technologies, such as automatic passenger counting (APC) systems and automatic vehicle location and control (AVLC), have been employed by some transit agencies and are described in the synthesis.« less

  3. Person-Centered Transition Planning.

    ERIC Educational Resources Information Center

    Miner, Craig A.; Bates, Paul E.

    1997-01-01

    Describes a person-centered planning approach for involving students with disabilities and their families in the transition planning process. Components of person-centered planning are discussed, including development of a personal profile, identification of future lifestyle preferences, action steps and responsible parties, and necessary changes…

  4. Identifying a Transition Competency Domain Structure: Assisting Transition Planning Teams to Understand Roles and Responsibilities of Community Partners

    ERIC Educational Resources Information Center

    Plotner, Anthony; Trach, John; Shogren, Karrie

    2012-01-01

    The special education and rehabilitation literature is replete with articles examining transition planning, services and supports; however, transition models have typically been developed for the school context and not focused on other transition team members. These school-based models are important; however, models developed from the perspectives…

  5. Hazardous materials risk assessment : phase I

    DOT National Transportation Integrated Search

    2011-08-01

    This report presents the test plan for collecting and analyzing transit system data for the Atlanta Congestion Reduction Demonstration (CRD) under the United States Department of Transportation (U.S. DOT) Urban Partnership Agreement (UPA) and CRD Pro...

  6. Track Geometry Development : UMTA Urban Rail Supporting Technology Program

    DOT National Transportation Integrated Search

    1974-04-01

    Measurement of transit system track geometry parameters, under normal operating conditions, is essential for planning and conducting an effective maintenance program. The pertinent parameters are profile, gage, alignment, and cross level. Present met...

  7. Highway effects on vehicle performance

    DOT National Transportation Integrated Search

    1995-01-01

    Improving our nation's transportation system is the goal of the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA), which authorizes Federal highway and transit funding programs. The ISTEA views planning as a key strategy to improve the...

  8. Team processes in airway facilities operations control centers.

    DOT National Transportation Integrated Search

    2000-07-01

    In October 2000, the Airway Facilities organization plans to transition the National Airspace System (NAS) monitoring responsibilities to three regional Operations Control Centers (OCCs). Teams in these facilities will be different from those that cu...

  9. Cost/Benefit Analysis of the Army Education Information System (AREIS)

    DTIC Science & Technology

    1980-11-01

    educational and vocational opportunities to civilian life d. improved transition from military life to civilian life . 30 8. Counselor and FSO clerical...Columbia Uiversity , ,-- T. Oliver, L.W., and Day, R.W., October-Novenber 1976 Field Tryout of Officer Career Information and Planning System. ARI Draft

  10. Halon 1301 management planning guidance

    NASA Astrophysics Data System (ADS)

    1995-05-01

    This ETL provides guidance to help the Base Civil Engineer (BCE) and other users manage inventories of Halon 1301, an ozone depleting substance used in many facility fire protection systems. This guidance will allow Halon 1301 users to develop the transition plans necessary to implement the DOD and Air Force policies on ozone depleting substances. Attachment 3 to this ETL contains detailed instructions on how to develop a Base Halon 1 301 Management Plan and comply with Air Force policies and regulations designed to minimize dependency on Halon 1301.

  11. Tank waste remediation system configuration management implementation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vann, J.M.

    1998-03-31

    The Tank Waste Remediation System (TWRS) Configuration Management Implementation Plan describes the actions that will be taken by Project Hanford Management Contract Team to implement the TWRS Configuration Management program defined in HNF 1900, TWRS Configuration Management Plan. Over the next 25 years, the TWRS Project will transition from a safe storage mission to an aggressive retrieval, storage, and disposal mission in which substantial Engineering, Construction, and Operations activities must be performed. This mission, as defined, will require a consolidated configuration management approach to engineering, design, construction, as-building, and operating in accordance with the technical baselines that emerge from themore » life cycles. This Configuration Management Implementation Plan addresses the actions that will be taken to strengthen the TWRS Configuration Management program.« less

  12. Everett Transit 1994,Comprehensive Plan

    DOT National Transportation Integrated Search

    1994-09-07

    Everett Transit's Comprehensive Plann provides the long-term framework to guide : the development of public transportation services in Everett over the next : twenty years. In this plan, Everett Transit clearly defines its mission, future : direction...

  13. Utah's Transition Guidelines for Students at Risk and Students with Mild/Moderate Handicaps.

    ERIC Educational Resources Information Center

    Utah State Board of Education, Salt Lake City.

    These transition guidelines are designed to give Utah school districts direction in planning transition programs for Utah students at risk and/or students with disabilities. The guidelines present best practices in planning to assist these special needs students from school to life in their communities. The five-step process includes planning,…

  14. Coherence and Compliance of Kohler's Model for Successful Transition Planning with Classified Special Education Students

    ERIC Educational Resources Information Center

    Karahalis, John

    2011-01-01

    This researcher addresses whether transition planning with classified special education students is being implemented in accordance with the Kohler model for successful transition planning. Using archival data available from two high schools, one with a specialized on campus program and the latter as an excluded site specializing in classified…

  15. Land use impacts of low-carbon energy system transition - the case of UK bioenergy deployment under the Carbon Plan

    NASA Astrophysics Data System (ADS)

    Konadu, D. D.; Sobral Mourao, Z.; Lupton, R.; Skelton, S.

    2015-12-01

    The UK Department of Energy and Climate Change has developed four low-carbon energy transition pathways - the Carbon Plan - towards achieving the legally binding 80% territorial greenhouse gas emissions reduction, stipulated in the 2008 Climate Change Act by 2050. All the pathways require increase in bioenergy deployment, of which a significant amount could be indigenously sourced from crops. But will increased domestic production of energy crops conflict with other land use and ecosystem priorities? To address this question, a coupled analysis of the four energy transition pathways and land use has been developed using an integrated resource accounting platform called ForeseerTM. The two systems are connected by the bioenergy component, and are projected forward in time to 2050, under different scenarios of energy crop composition and yield, and accounting for various constraints on land use for agriculture and ecosystem services. The results show between 7 and 61% of UK agricultural land could be required to meet bioenergy deployment projections under different combinations of crop yield and compositions for the transition pathways. This could result in competition for land for food production and other socio-economic and ecological land uses. Consequently, the potential role of bioenergy in achieving UK emissions reduction targets may face significant deployment challenges.

  16. Highlights from a Mach 4 Experimental Demonstration of Inlet Mode Transition for Turbine-Based Combined Cycle Hypersonic Propulsion

    NASA Technical Reports Server (NTRS)

    Foster, Lancert E.; Saunders, John D., Jr.; Sanders, Bobby W.; Weir, Lois J.

    2012-01-01

    NASA is focused on technologies for combined cycle, air-breathing propulsion systems to enable reusable launch systems for access to space. Turbine Based Combined Cycle (TBCC) propulsion systems offer specific impulse (Isp) improvements over rocket-based propulsion systems in the subsonic takeoff and return mission segments along with improved safety. Among the most critical TBCC enabling technologies are: 1) mode transition from the low speed propulsion system to the high speed propulsion system, 2) high Mach turbine engine development and 3) innovative turbine based combined cycle integration. To address these challenges, NASA initiated an experimental mode transition task including analytical methods to assess the state-of-the-art of propulsion system performance and design codes. One effort has been the Combined-Cycle Engine Large Scale Inlet Mode Transition Experiment (CCE-LIMX) which is a fully integrated TBCC propulsion system with flowpath sizing consistent with previous NASA and DoD proposed Hypersonic experimental flight test plans. This experiment was tested in the NASA GRC 10 by 10-Foot Supersonic Wind Tunnel (SWT) Facility. The goal of this activity is to address key hypersonic combined-cycle engine issues including: (1) dual integrated inlet operability and performance issues-unstart constraints, distortion constraints, bleed requirements, and controls, (2) mode-transition sequence elements caused by switching between the turbine and the ramjet/scramjet flowpaths (imposed variable geometry requirements), and (3) turbine engine transients (and associated time scales) during transition. Testing of the initial inlet and dynamic characterization phases were completed and smooth mode transition was demonstrated. A database focused on a Mach 4 transition speed with limited off-design elements was developed and will serve to guide future TBCC system studies and to validate higher level analyses.

  17. The Effect of Person Centered Planning Activities on the IEP/Transition Planning Process.

    ERIC Educational Resources Information Center

    Miner, Craig A.; Bates, Paul E.

    1997-01-01

    A study of 22 students with mental retardation and their families evaluated the impact of person-centered planning activities on several variables related to a student's individual education program/transition planning meeting. Person-centered planning had a significant effect on parent participation in meetings, but not on discussion of…

  18. Transit in Greater Arizona : final report.

    DOT National Transportation Integrated Search

    2016-07-01

    This study informed the Arizona Department of Transportations future State Transit Plan. The study : addressed transit planning and use with emphasis on Greater Arizona, those portions of the state that : consist primarily of rural areas or smalle...

  19. Transit in greater Arizona : final report.

    DOT National Transportation Integrated Search

    2016-07-01

    This study informed the Arizona Department of Transportations future State Transit Plan. The study : addressed transit planning and use with emphasis on Greater Arizona, those portions of the state that : consist primarily of rural areas or smalle...

  20. Financial Planning in Transit : Use of Commercially Available Microcomputer Software

    DOT National Transportation Integrated Search

    1983-11-01

    This report addresses the potential of using commercially available microcomputer software for transit financial planning activities. Discussions with transit operators identified the need for inexpensive, easy to use software for ridership and fare ...

  1. Transit green building action plan : report to congress

    DOT National Transportation Integrated Search

    2009-06-04

    The explanatory statement accompanying the fiscal year 2009 Omnibus appropriations : act1 directed the Federal Transit Administration (FTA) to submit a transit facility green : building action plan to the House and Senate Committees on Appropriati...

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Office of Legacy Management (LM) is an integral part of the U.S. Department of Energy’s (DOE’s) strategy to ensure that legacy liabilities of former nuclear weapons production sites are properly managed following the completion of environmental cleanup activities. LM will work with each site using an integrated team approach to ensure a successful transition. Part of this process will include transition of Government records and information. The Office of Legacy Management Information and Records Management Transition Guidance focuses on LM’s goal to preserve and protect legacy records and information. This guidance document establishes a framework for the transfer ofmore » records management responsibilities for sites transferring to LM. It describes the requirements, responsibilities, and procedures for the efficient and cost-effective transfer of custody, ownership, and management of records and other information products from the transfer site to LM. Records management practices are critical to the functions of Federal agencies because records provide information about, or evidence of, the organization, functions, policies, decisions, procedures, operations, or other activities. Therefore, the information generated by an agency is created, maintained, and dispositioned through records management processes that ensure the appropriate preservation and retrieval of essential information. Because of their intrinsic value, best practices to preserve information and records should be utilized when records are transferred from one organization to another. As the transfer program completes cleanup activities at closure sites, a transitional process will facilitate the transparent shift in the management of site records activities to LM. The roles and responsibilities of the transfer site and/or program and LM described in this document are a necessary foundation for cooperation and coordination and are essential to the successful transition of records and information responsibilities. The DOE Office of the Chief Information Officer (OCIO) has a central role in DOE records management by providing guidance, expertise, and coordination to all DOE offices and organizations and coordination with the National Archives and Records Administration (NARA). LM and the transfer site will complete an integrated transition plan which will integrate all transition elements including information and records. As part of the overall transition plan, an Information and Records Transition Plan will be developed consistent with the integrated transition plan for the site transfer and included as an attachment. The Information and Records Management Transition Plan will be developed to assist both organizations in organizing the tasks; establishing a timetable and milestones for their completion; and identifying manpower, funding and other resources that will be needed to complete the ownership transfer. In addition, the plan will provide a valuable exchange of institutional knowledge that will assist LM in meeting the obligations of responsibly managing legacy records. Guidance for the development of the plan is included in this document. Records management concerns that may arise during site closure, such as management support, contract language and agreements, interactions with the OCIO and NARA, resource and budget considerations, and procedures to safeguard records are addressed. Guidelines and criteria for records management transition activities are also provided. These include LM expectations for the inventory, scheduling, and disposition of records; the management and transfer of electronic files, including databases and software; records finding aids, indices, and recordkeeping systems; and the process for the transfer of hard copy and electronic records to LM.« less

  3. Transition plan.

    DOT National Transportation Integrated Search

    2009-02-02

    Although the 9-1-1 system has been a success for nearly 40 years, changes in the publics use of : technology, the saturation of the mobile market, and the spread of Voice over Internet Protocol (VoIP) : telephony over broadband are contributing to...

  4. A bicycle network analysis tool for planning applications in small communities.

    DOT National Transportation Integrated Search

    2015-05-01

    Non-motorized transportation modes such as bicycles constitute an important part of a : communitys transportation system; they are vital to the success of transit-oriented developments : (TODs). However, bicycles were often ignored in transportati...

  5. Measurement and evaluation of transit travel time reliability

    DOT National Transportation Integrated Search

    2011-01-01

    Transportation system customers need consistency in their daily travel times to enable them to plan their daily : activities, whether that is a commuter on their way to work, a company setting up delivery schedules for justintime : manufacturin...

  6. Advanced Ceramic-Metallic Composites for Lightweight Vehicle Braking Systems

    DOT National Transportation Integrated Search

    2012-09-11

    According to the Federal Transit Administration Strategic Research Plan [1]: Researching technologies to reduce vehicle weight can also lead to important reductions in fuel consumption and emissions. The power required to accelerate a bus and over...

  7. Task sequence planning in a robot workcell using AND/OR nets

    NASA Technical Reports Server (NTRS)

    Cao, Tiehua; Sanderson, Arthur C.

    1991-01-01

    An approach to task sequence planning for a generalized robotic manufacturing or material handling workcell is described. Given the descriptions of the objects in this system and all feasible geometric relationships among these objects, an AND/OR net which describes the relationships of all feasible geometric states and associated feasibility criteria for net transitions is generated. This AND/OR net is mapped into a Petri net which incorporates all feasible sequences of operations. The resulting Petri net is shown to be bounded and have guaranteed properties of liveness, safeness, and reversibility. Sequences are found from the reachability tree of the Petri net. Feasibility criteria for net transitions may be used to generate an extended Petri net representation of lower level command sequences. The resulting Petri net representation may be used for on-line scheduling and control of the system of feasible sequences. A simulation example of the sequences is described.

  8. Assessment to Guide Individualized Transition Plans from School to Post-School for Children Ages 14+ with Moderate Disabilities

    ERIC Educational Resources Information Center

    Skidmore, Kevin

    2014-01-01

    As a part of the Individualized Education Plan (IEP), special education teachers work along with their student with special needs and their parent(s)/guardian(s) to create and implement Individualized Transition Plans (ITP) to assist the student with their transition to the post-school environment. As mandated by Individuals with Disabilities…

  9. The Effect of Student-Directed Transition Planning with a Computer-Based Reading Support Program on the Self-Determination of Students with Disabilities

    ERIC Educational Resources Information Center

    Lee, Youngsun; Wehmeyer, Michael L.; Palmer, Susan B.; Williams-Diehm, Kendra; Davies, Daniel K.; Stock, Steven E.

    2011-01-01

    The purpose of this study was to investigate the impact of student-directed transition planning instruction ("Whose Future Is It Anyway?" curriculum) with a computer-based reading support program ("Rocket Reader") on the self-determination, self-efficacy and outcome expectancy, and transition planning knowledge of students with disabilities. This…

  10. Use of business planning methods to monitor global health budgets in Turkmenistan.

    PubMed Central

    Ensor, T.; Amannyazova, B.

    2000-01-01

    After undergoing many changes, the financing of health care in countries of the former Soviet Union is now showing signs of maturing. Soon after the political transition in these countries, the development of insurance systems and fee-for-service payment systems dominated the discussions on health reform. At present there is increasing emphasis on case mix adjusted payments in larger hospitals and on global budgets in smaller district hospitals. The problem is that such systems are often mistrusted for not providing sufficient financial control. At the same time, unless further planned restructuring is introduced, payment systems cannot on their own induce the fundamental change required in the health care system. As described in this article, in Tejen etrap (district), Turkmenistan, prospective business plans, which link planned objectives and activities with financial allocations, provide a framework for setting and monitoring budget expenditure. Plans can be linked to the overall objectives of the restructuring system and can be used to ensure sound financial management. The process of business planning, which calls for a major change in the way health facilities examine their activities, can be used as a vehicle to increase awareness of management issues. It also provides a way of satisfying the requirement for a rigorous, bottom-up planning of financial resources. PMID:10994288

  11. Elaboration d'un plan de transition et de mise en oeuvre pour ameliorer la gestion de l'obsolescence dans une entreprise du secteur aeronautique =

    NASA Astrophysics Data System (ADS)

    Conrad, Heloise

    L'evolution technologique des composants electroniques entraine des problemes de gestion de l'obsolescence dans le secteur aeronautique. Les systemes aeronautiques ont en effet des durees de vie nettement superieures aux composants qu'ils contiennent. Cette difference de duree de vie et les normes strictes propres a l'aeronautique obligent les constructeurs a mettre en place une gestion efficace de l'obsolescence pour eviter les couts supplementaires de maintenance et de retards. De plus, a cause des faibles volumes de production qu'ils representent, les constructeurs aeronautiques n'ont que peu de controle sur leur chaine d'approvisionnement. La litterature offre beaucoup d'etudes sur l'obsolescence, appliquees a l'aeronautique. Les auteurs recommandent de mettre en place des processus de gestion et de prevision de l'obsolescence, et de construire des relations de collaboration avec leurs fournisseurs, qui ont plus de visibilite sur la chaine d'approvisionnement. Cette recherche presente d'abord l'elaboration d'une liste de criteres de bonne gestion de l'obsolescence, ainsi que la creation d'une methode de generation de plan de transition et de mise en oeuvre de l'amelioration de la gestion et de la prevision de l'obsolescence pour un cas concret. La methode est creee pour un manufacturier aeronautique ne possedant pas de systemes de gestion proactive ou de prevision de l'obsolescence. La creation de la methode s'est faite en suivant la methodologie de la science de la conception, en impliquant les employes concernes par la gestion de l'obsolescence. La methode comporte douze (12) etapes, amenant au developpement du plan de transition et de mise en oeuvre. Pour applique la methode, divers entretiens individuels et de groupe ont ete realises. Ces entretiens ont aussi permis de lister les criteres de gestion et de prevision efficaces de l'obsolescence. Cette liste a ete comparee avec les criteres issus de la litterature. En respect des besoins enonces par les employes et des conseils d'un industriel expert en obsolescence des composants avioniques, le plan de transition et de mise en oeuvre cree se divise en trois (3) phases : 1) amelioration de la gestion de l'obsolescence, 2) amelioration de la prevision de l'obsolescence et 3) gestion des fournisseurs. Meme si le plan de transition n'a pas ete applique dans l'entreprise partenaire, la methode et le plan cree ont ete approuves par les employes et utilisateurs.

  12. The Future of Electricity Resource Planning

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kahrl, Fredrich; Mills, Andrew; Lavin, Luke

    Electricity resource planning is the process of identifying longer-term investments to meet electricity reliability requirements and public policy goals at a reasonable cost. Resource planning processes provide a forum for regulators, electric utilities, and electricity industry stakeholders to evaluate the economic, environmental, and social benefits and costs of different investment options. By facilitating a discussion on future goals, challenges and strategies, resource planning processes often play an important role in shaping utility business decisions. Resource planning emerged more than three decades ago in an era of transition, where declining electricity demand and rising costs spurred fundamental changes in electricity industrymore » regulation and structure. Despite significant changes in the industry, resource planning continues to play an important role in supporting investment decision making. Over the next two decades, the electricity industry will again undergo a period of transition, driven by technological change, shifting customer preferences and public policy goals. This transition will bring about a gradual paradigm shift in resource planning, requiring changes in scope, approaches and methods. Even as it changes, resource planning will continue to be a central feature of the electricity industry. Its functions — ensuring the reliability of high voltage (“bulk”) power systems, enabling oversight of regulated utilities and facilitating low-cost compliance with public policy goals — are likely to grow in importance as the electricity industry enters a new period of technological, economic and regulatory change. This report examines the future of electricity resource planning in the context of a changing electricity industry. The report examines emerging issues and evolving practices in five key areas that will shape the future of resource planning: (1) central-scale generation, (2) distributed generation, (3) demand-side resources, (4) transmission and (5) uncertainty and risk management. The analysis draws on a review of recent resource plans for 10 utilities that reflect some of the U.S. electricity industry’s extensive diversity.« less

  13. Geographic variation in floral allometry suggests repeated transitions between selfing and outcrossing in a mixed mating plant.

    PubMed

    Summers, Holly E; Hartwick, Sally M; Raguso, Robert A

    2015-05-01

    Isometric and allometric scaling of a conserved floral plan could provide a parsimonious mechanism for rapid and reversible transitions between breeding systems. This scaling may occur during transitions between predominant autogamy and xenogamy, contributing to the maintenance of a stable mixed mating system. We compared nine disjunct populations of the polytypic, mixed mating species Oenothera flava (Onagraceae) to two parapatric relatives, the obligately xenogamous species O. acutissima and the mixed mating species O. triloba. We compared floral morphology of all taxa using principal component analysis (PCA) and developmental trajectories of floral organs using ANCOVA homogeneity of slopes. The PCA revealed both isometric and allometric scaling of a conserved floral plan. Three principal components (PCs) explained 92.5% of the variation in the three species. PC1 predominantly loaded on measures of floral size and accounts for 36% of the variation. PC2 accounted for 35% of the variation, predominantly in traits that influence pollinator handling. PC3 accounted for 22% of the variation, primarily in anther-stigma distance (herkogamy). During O. flava subsp. taraxacoides development, style elongation was accelerated relative to anthers, resulting in positive herkogamy. During O. flava subsp. flava development, style elongation was decelerated, resulting in zero or negative herkogamy. Of the two populations with intermediate morphology, style elongation was accelerated in one population and decelerated in the other. Isometric and allometric scaling of floral organs in North American Oenothera section Lavauxia drive variation in breeding system. Multiple developmental paths to intermediate phenotypes support the likelihood of multiple mating system transitions. © 2015 Botanical Society of America, Inc.

  14. Short-range transit plan for the Phoenix urbanized area : fiscal years 1982-1986

    DOT National Transportation Integrated Search

    1981-07-21

    Report presents the FY 1980-81 update of the Phoenix, Arizona, urbanized area Short Range Transit Plan. It describes a five-year plan to guide improvements of the public transportation sytem. Planning aspects of the report will be incorporated into t...

  15. Transition planning for youth with traumatic brain injury: findings from the National Longitudinal Transition Survey-2.

    PubMed

    Wehman, Paul; Chen, Chin-Chih; West, Michael; Cifu, Gabriella

    2014-01-01

    Despite of a growing body of research on vocational and educational difficulties for students with traumatic brain injury (TBI), only limited empirical studies specifically examined how school transition services facilitate later employment outcomes. This exploratory, prospective longitudinal study examined the prevalence of employment and characteristics of transition planning practices that promoted positive school-to-work transition for students with TBI. The participants (n = 200) was drawn from the National Longitudinal Transition Study-2 (NLTS-2), a ten-year study which followed a large nationally representative sample of youth with disabilities through secondary education in into young adulthood. Logistic regression was used to investigate the associations between student, school, and collaborative engagement in the planning process and employment outcomes up to 8 years after high school. Among youth with TBI, 51% held current employment at the time of interview and 73% had been employed at any time after high school. Findings showed that students with TBI who had transition goals for postsecondary education were more likely to be employed at some point since leaving high school. The findings also support active student engagement and leadership in the transition planning process, and the inclusion of outside organizations and individuals. Findings indicate the impact of student, school and adult service agency engagement in transition planning processes. Implications for educational practices and future research are discussed.

  16. Rural Vocational and Transition Assessment Practices for Students with Intellectual Disabilities: What Do Educators Really Know?

    ERIC Educational Resources Information Center

    Brendle, Janna; Tucker, Kathryn J.; Lock, Robin H.

    2018-01-01

    Transition planning requires quality vocational and transition assessment tailored to the student's needs, strengths, preferences and interests. Limited research is currently available that addresses assessment types and use of results that rural practitioners utilize to aid in transition planning for students with intellectual disabilities (ID).…

  17. Testing of the NASA Hypersonics Project Combined Cycle Engine Large Scale Inlet Mode Transition Experiment (CCE LlMX)

    NASA Technical Reports Server (NTRS)

    Saunders, J. D.; Stueber, T. J.; Thomas, S. R.; Suder, K. L.; Weir, L. J.; Sanders, B. W.

    2012-01-01

    Status on an effort to develop Turbine Based Combined Cycle (TBCC) propulsion is described. This propulsion technology can enable reliable and reusable space launch systems. TBCC propulsion offers improved performance and safety over rocket propulsion. The potential to realize aircraft-like operations and reduced maintenance are additional benefits. Among most the critical TBCC enabling technologies are: 1) mode transition from turbine to scramjet propulsion, 2) high Mach turbine engines and 3) TBCC integration. To address these TBCC challenges, the effort is centered on a propulsion mode transition experiment and includes analytical research. The test program, the Combined-Cycle Engine Large Scale Inlet Mode Transition Experiment (CCE LIMX), was conceived to integrate TBCC propulsion with proposed hypersonic vehicles. The goals address: (1) dual inlet operability and performance, (2) mode-transition sequences enabling a switch between turbine and scramjet flow paths, and (3) turbine engine transients during transition. Four test phases are planned from which a database can be used to both validate design and analysis codes and characterize operability and integration issues for TBCC propulsion. In this paper we discuss the research objectives, features of the CCE hardware and test plans, and status of the parametric inlet characterization testing which began in 2011. This effort is sponsored by the NASA Fundamental Aeronautics Hypersonics project

  18. The Road to ICD-10-CM/PCS Implementation: Forecasting the Transition for Providers, Payers, and Other Healthcare Organizations

    PubMed Central

    Sanders, Tekla B; Bowens, Felicia M; Pierce, William; Stasher-Booker, Bridgette; Thompson, Erica Q; Jones, Warren A

    2012-01-01

    This article will examine the benefits and challenges of the US healthcare system's upcoming conversion to use of the International Classification of Diseases, Tenth Revision, Clinical Modification/Procedure Coding System (ICD-10-CM/PCS) and will review the cost implications of the transition. Benefits including improved quality of care, potential cost savings from increased accuracy of payments and reduction of unpaid claims, and improved tracking of healthcare data related to public health and bioterrorism events are discussed. Challenges are noted in the areas of planning and implementation, the financial cost of the transition, a shortage of qualified coders, the need for further training and education of the healthcare workforce, and the loss of productivity during the transition. Although the transition will require substantial implementation and conversion costs, potential benefits can be achieved in the areas of data integrity, fraud detection, enhanced cost analysis capabilities, and improved monitoring of patients’ health outcomes that will yield greater cost savings over time. The discussion concludes with recommendations to healthcare organizations of ways in which technological advances and workforce training and development opportunities can ease the transition to the new coding system. PMID:22548024

  19. Test, Control and Monitor System maintenance plan

    NASA Technical Reports Server (NTRS)

    Buehler, David P.; Lougheed, M. J.

    1993-01-01

    The maintenance requirements for Test, Control, and Monitor System (TCMS) and the method for satisfying these requirements prior to First Need Date (FND) of the last TCMS set are described. The method for satisfying maintenance requirements following FND of the last TCMS set will be addressed by a revision to this plan. This maintenance plan serves as the basic planning document for maintenance of this equipment by the NASA Payloads Directorate (CM) and the Payload Ground Operations Contractor (PGOC) at KSC. The terms TCMS Operations and Maintenance (O&M), Payloads Logistics, TCMS Sustaining Engineering, Payload Communications, and Integrated Network Services refer to the appropriate NASA and PGOC organization. For the duration of their contract, the Core Electronic Contractor (CEC) will provide a Set Support Team (SST). One of the primary purposes of this team is to help NASA and PGOC operate and maintain TCMS. It is assumed that SST is an integral part of TCMS O&M. The purpose of this plan is to describe the maintenance concept for TCMS hardware and system software in order to facilitate activation, transition planning, and continuing operation. When software maintenance is mentioned in this plan, it refers to maintenance of TCMS system software.

  20. Dots & dashes : piecing together transit's future.

    DOT National Transportation Integrated Search

    2008-11-01

    Dots & Dashes is an interactive board game that is used at public planning meetings to engage stakeholders in long range transit planning. Groups of three to six people use game pieces with monetary values to choose the priorities of transit projects...

  1. SU-E-T-783: Using Matrixx to Determine Transit Dose Contribution Over Clinically Useful Limits of HDR Source Activity

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bhagwat, M; O’Farrell, D; Wagar, M

    2015-06-15

    Purpose: Most HDR brachytherapy treatment planning systems (TPS) use TG-43 formalism to calculate dose without including transit dose corrections. Historically, measurement of this contribution has required sophisticated apparatus unavailable in most hospitals. We use Matrixx to investigate several scenarios where transit dose contribution may effect a clinical treatment. Methods: Treatment plans were generated using Oncentra Brachy TPS (Version 4.3.0.410, Nucletron ) on a CT scan of a 24-catheter Freiburg applicator (Nucletron ) laid flat on the MatriXX (IBA) detector. This detector is an array of 1020 parallel plate ion chambers. All 24 catheters were digitized and dwells within a centralmore » square region of 5×5cm of the applicator were activated. Each of the active catheters had 6 dwells in increments of 1.0cm. The plans were normalized to 10mm. This places the 100% isodose line at the correct effective point of measurement, which lies half-way between the parallel plates of the ion chambers. It is also within the clinically relevant treatment depth for superficial applications. A total of 6 plans were delivered for 3 prescription doses, 1Gy, 2Gy and 4Gy using source activities of 2.9Ci and 11.2Ci. The MatriXX array was operated to capture dosimetric snaps every 500ms and yielded an integral dose at the end of treatment. Results: A comparison of integral dose from 2 different source activities shows that the transit dose contribution is larger when the source activity is higher. It is also observed that the relative transit dose contribution decreases as prescription dose increases. This is quantified by the Gamma analysis. Conclusion: We have demonstrated that the Matrixx detector can be used to evaluate the contribution for a HDR source during transit from the HDR afterloader to a dwell location, and between adjacent dwell locations.« less

  2. Examining challenges, opportunities and best practices for addressing rural mobility and economic development under SAFETEA-LU's coordinated planning and human services framework.

    DOT National Transportation Integrated Search

    2011-07-01

    In response to changes in federal requirements for rural transit planning, the Texas State Legislature and the Texas Department of Transportation have recently developed coordinated transit and human services plans for the 24 planning regions in the ...

  3. Safety of High Speed Guided Ground Transportation Systems - Magnetic and Electric Field Testing of the Massachusetts Bay Transportation Authority (MBTA) Urban Transit System: Volume I - Analysis

    DOT National Transportation Integrated Search

    1993-06-01

    The safety of magnetlcally levitated (maglev) and high speed rail (HSR) trains proposed for application in the : United States is the responsibility of the Federal Railroad Administratlon (FRA). Plans for near future US applications : include maglev ...

  4. Safety of High Speed Guided Ground Transportation Systems : Magnetic and Electric Field Testing of the Washington Metropolitan Area Transit Authority Metrorail System. v. 1. Analysis.

    DOT National Transportation Integrated Search

    1993-06-01

    The safety of magnetically levitated (maglev) and high speed rail (HSR) trains proposed for application in the United States is the responsibility of the Federal Railroad Administration (FRA). Plans for near future US applications include maglev tech...

  5. Sewing a Seamless Education System. Preschool through Postsecondary.

    ERIC Educational Resources Information Center

    McCabe, Robert H.

    Today's educational systems work as separate parts with little coordination between academic levels or long-range planning. The transition from elementary school to middle school, middle school to high school, and high school to college is disjointed and often traumatic, producing unneeded anxiety and stress on top of the need to adapt to new…

  6. Vietnam: Education Financing. A World Bank Country Study.

    ERIC Educational Resources Information Center

    World Bank, Washington, DC.

    This study examines the system of education and training in Vietnam and poses the question: what changes in educational policies will ensure that students who pass through the system today will acquire the knowledge, skills, and attitudes needed for Vietnam to successfully complete the transition from a planned to a market economy? The report…

  7. A procedural method for express bus-fringe parking transit planning.

    DOT National Transportation Integrated Search

    1976-01-01

    The report illustrates a procedural method for planning express bus-fringe parking transit services - a method built upon the findings from previous research, including disaggregate travel choice models and planning guidelines. The methodology addres...

  8. "Close the Door on Your Way Out": Parent Perspectives on Supported Transition Planning for Young People with Special Educational Needs and Disabilities in Ireland

    ERIC Educational Resources Information Center

    Doyle, Alison; Mc Guckin, Conor; Shevlin, Michael

    2017-01-01

    Students with Special Educational Needs and Disabilities encounter complex and circuitous transitions from post-primary settings to Higher Education. In Ireland, inequitable access to Individual Education Plans, and a lack of policy infrastructure to provide formal transition planning, means that these journeys are varied and uncertain. This study…

  9. A Review of Interventions Aimed at Facilitating Successful Transition Planning and Transfer to Adult Care Among Youth with Chronic Illness.

    PubMed

    Weissberg-Benchell, Jill; Shapiro, Jenna B

    2017-05-01

    This article reviews studies that developed interventions aimed at facilitating the transition process and/or the transfer of youth with chronic illness to adult programs during the past decade. Three key intervention approaches have been studied. Data assessing the impact of transition coordinators suggest that the most successful outcomes occur when coordinators meet with patients prior to the transfer of care, support them as they negotiate the adult programs, and facilitate appointment keeping. Data assessing the impact of transition clinics suggest that the key to positive outcomes is helping patients develop a trusting relationship with the adult providers before fully transferring their care to the adult clinic. Similar conclusions can be drawn for transition programs, where it appears that the opportunity to discuss and plan transition with a pediatric provider over time and to meet with both the pediatric and adult providers simultaneously are beneficial for facilitating successful transfer to adult care. Although aspects of these care processes appear promising for improving transition success, this review identifies areas that need further study. We argue that studies are needed that examine individual patient and family-focused interventions as well as looking at other potential interventions in the health care system. [Pediatr Ann. 2017;46(5):e182-e187.]. Copyright 2017, SLACK Incorporated.

  10. Federal Register /Vol. 73, No. 96 / Friday, May 16, 2008 /Notices

    DOT National Transportation Integrated Search

    2008-05-16

    The Office of Space : Commercialization seeks comments on a : plan to transition the installed base of : codeless and semi-codeless Global : Positioning System (GPS) user : equipment to next-generation : equipment utilizing the modernized : civil GPS...

  11. FY 2002 strategic plan, Georgia Department of Transportation

    DOT National Transportation Integrated Search

    2001-08-01

    The Georgia DOT is authorized by Title 32 of the Georgia Code to organize, administer and operate an efficient, modern system of public roads, highways and other modes of transportation including public transit, rail, aviation, ports and bicycle and ...

  12. System acceptance test plan : Dallas Integrated Corridor Management (ICM) demonstration project.

    DOT National Transportation Integrated Search

    2013-02-01

    The Dallas Area Rapid Transit (DART) is leading the US 75 Integrated Corridor Management (ICM) Demonstration Project for the Dallas region. Coordinated corridor operations and management is predicated on being able to share transportation information...

  13. Improving the Transition of Earth Satellite Observations from Research to Operations

    NASA Technical Reports Server (NTRS)

    Goodman, Steven J.; Lapenta, William M.; Jedlovec, Gary J.

    2004-01-01

    There are significant gaps between the observations, models, and decision support tools that make use of new data. These challenges include: 1) Decreasing the time to incorporate new satellite data into operational forecast assimilation systems, 2) Blending in-situ and satellite observing systems to produce the most accurate and comprehensive data products and assessments, 3) Accelerating the transition from research to applications through national test beds, field campaigns, and pilot demonstrations, and 4) Developing the partnerships and organizational structures to effectively transition new technology into operations. At the Short-term Prediction Research and Transition (SPORT) Center in Huntsville, Alabama, a NASA-NOAA-University collaboration has been developed to accelerate the infusion of NASA Earth science observations, data assimilation and modeling research into NWS forecast operations and decision-making. The SPoRT Center research focus is to improve forecasts through new observation capability and the regional prediction objectives of the US Weather Research Program dealing with 0-1 day forecast issues such as convective initiation and 24-hr quantitative precipitation forecasting. The near real-time availability of high-resolution experimental products of the atmosphere, land, and ocean from the Moderate Resolution Imaging Spectroradiometer (MODIS), the Advanced Infrared Spectroradiometer (AIRS), and lightning mapping systems provide an opportunity for science and algorithm risk reduction, and for application assessment prior to planned observations from the next generation of operational low Earth orbiting and geostationary Earth orbiting satellites. This paper describes the process for the transition of experimental products into forecast operations, current products undergoing assessment by forecasters, and plans for the future. The SPoRT Web page is at (http://www.ghcc.msfc.nasa.gov/sport).

  14. Transition Assessment and Planning for Youth with Severe Intellectual and Developmental Disabilities

    ERIC Educational Resources Information Center

    Carter, Erik W.; Brock, Matthew E.; Trainor, Audrey A.

    2014-01-01

    Although federal law now mandates age-appropriate transition assessment as a key component of high-quality transition planning, little research exists to guide educators on what they might learn when undertaking this process. In this study, the authors examined teacher and parent assessments of the transition-related strengths and needs of 134…

  15. Health Care Transition Planning among Adolescents with Autism Spectrum Disorder

    ERIC Educational Resources Information Center

    Walsh, Casey; Jones, Barbara; Schonwald, Alison

    2017-01-01

    Improving the health care transition process for youth with autism spectrum disorder (ASD) is critically important. This study was designed to examine the overall national transition core outcome among youth with ASD and each of the component measures of health care transition planning. Fewer than 10% of youth with ASD meet the national transition…

  16. Transit bus stop pedestrian warning application : acceptance test plan : final report.

    DOT National Transportation Integrated Search

    2016-10-14

    This document is the Acceptance Test Plan for the Transit Bus Stop Pedestrian Warning (TSPW) application. This report describes the test and demonstration plan to verify that the application meets its functional and performance requirements.

  17. Takeover Time in Highly Automated Vehicles: Noncritical Transitions to and From Manual Control.

    PubMed

    Eriksson, Alexander; Stanton, Neville A

    2017-06-01

    The aim of this study was to review existing research into driver control transitions and to determine the time it takes drivers to resume control from a highly automated vehicle in noncritical scenarios. Contemporary research has moved from an inclusive design approach to adhering only to mean/median values when designing control transitions in automated driving. Research into control transitions in highly automated driving has focused on urgent scenarios where drivers are given a relatively short time span to respond to a request to resume manual control. We found a paucity in research into more frequent scenarios for control transitions, such as planned exits from highway systems. Twenty-six drivers drove two scenarios with an automated driving feature activated. Drivers were asked to read a newspaper, or to monitor the system, and to relinquish, or resume, control from the automation when prompted by vehicle systems. Significantly longer control transition times were found between driving with and without secondary tasks. Control transition times were substantially longer than those reported in the peer-reviewed literature. We found that drivers take longer to resume control when under no time pressure compared with that reported in the literature. Moreover, we found that drivers occupied by a secondary task exhibit larger variance and slower responses to requests to resume control. Workload scores implied optimal workload. Intra- and interindividual differences need to be accommodated by vehicle manufacturers and policy makers alike to ensure inclusive design of contemporary systems and safety during control transitions.

  18. Toward late career transitioning: a proposal for academic surgeons.

    PubMed

    Richards, Robin; McLeod, Robin; Latter, David; Keshavjee, Shaf; Rotstein, Ori; Fehlings, Michael G; Ahmed, Najma; Nathens, Avery; Rutka, James

    2017-09-01

    In the absence of a defined retirement age, academic surgeons need to develop plans for transition as they approach the end of their academic surgical careers. The development of a plan for late career transition represents an opportunity for departments of surgery across Canada to initiate a constructive process in cooperation with the key stakeholders in the hospital or institution. The goal of the process is to develop an individual plan for each faculty member that is agreeable to the academic surgeon; informs the surgical leadership; and allows the late career surgeon, the hospital, the division and the department to make plans for the future. In this commentary, the literature on the science of aging is reviewed as it pertains to surgeons, and guidelines for late career transition planning are shared. It is hoped that these guidelines will be of some value to academic programs and surgeons across the country as late career transition models are developed and adopted.

  19. The Devil is in the Concepts: Lessons Learned from World War II Planning Staffs for Transitioning from Conceptual to Detailed Planning

    DTIC Science & Technology

    2017-05-25

    the planning process. Current US Army doctrine links conceptual planning to the Army Design Methodology and detailed planning to the Military...Decision Making Process. By associating conceptual and detailed planning with doctrinal methodologies , it is easy to regard the transition as a set period...plans into detailed directives resulting in changes to the operational environment. 15. SUBJECT TERMS Design; Army Design Methodology ; Conceptual

  20. 25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...

  1. 25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...

  2. 25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...

  3. 25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...

  4. 25 CFR Appendix A to Subpart B - Allowable Uses of IRR Program Funds

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... value and design life or increase the skid resistance of the pavement. 8. Tribally-owned, post-secondary... following planning and design activities: 1. Planning and design of IRR transit facilities eligible for IRR construction funding. 2. Planning and design of IRR roads and bridges. 3. Planning and design of transit...

  5. Reassessing passenger mile data for transit planning and fund allocation.

    DOT National Transportation Integrated Search

    2005-04-01

    This document provides information on the collection and use of passenger mile (PM) data that may be : helpful to the transit industry in reconsidering the use of PM data for transit planning and fund allocation. : Historically the industry seldom us...

  6. Cleaning Out the Wheelbarrow: Planning Appropriate Assessments for Transition.

    ERIC Educational Resources Information Center

    Finn, David M.; Tazioli, Pam

    1993-01-01

    Examines issues in the transition of young disabled children between programs: ignorance or misinformation about available resources; eligibility criteria; interagency information exchange; and advance planning. Provides a troubleshooting guide to help agencies evaluate transition procedures. Discusses interagency assessment models and tools to…

  7. Multigeneration data migration from legacy systems

    NASA Astrophysics Data System (ADS)

    Ratib, Osman M.; Liu, Brent J.; Kho, Hwa T.; Tao, Wenchao; Wang, Cun; McCoy, J. Michael

    2003-05-01

    The migration of image data from different generations of legacy archive systems represents a technical challenge and in incremental cost in transitions to newer generations of PACS. UCLA medical center has elected to completely replace the existing PACS infrastructure encompassing several generations of legacy systems by a new commercial system providing enterprise-wide image management and communication. One of the most challenging parts of the project was the migration of large volumes of legacy images into the new system. Planning of the migration required the development of specialized software and hardware, and included different phases of data mediation from existing databases to the new PACS database prior to the migration of the image data. The project plan included a detailed analysis of resources and cost of data migration to optimize the process and minimize the delay of a hybrid operation where the legacy systems need to remain operational. Our analysis and project planning showed that the data migration represents the most critical path in the process of PACS renewal. Careful planning and optimization of the project timeline and resources allocated is critical to minimize the financial impact and the time delays that such migrations can impose on the implementation plan.

  8. 7 CFR 15a.18 - Transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Office of the Secretary of Agriculture EDUCATION PROGRAMS OR ACTIVITIES RECEIVING OR BENEFITTING FROM... of Education, a transition plan shall: (1) State the name, address, and Federal Interagency Committee on Education (FICE) Code of the educational institution submitting such plan, the administratively...

  9. 22 CFR 229.230 - Transition plans.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Foreign Relations AGENCY FOR INTERNATIONAL DEVELOPMENT NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION... Secretary of Education, a transition plan shall: (1) State the name, address, and Federal Interagency Committee on Education Code of the educational institution submitting such plan, the administratively...

  10. Level of service for pedestrian movement towards the performance of passenger information in public transport stations in Klang Valley

    NASA Astrophysics Data System (ADS)

    Ramli, M. Z.; Hanipah, M. H.; Lee, L. G.; Loo, K. F.; Wong, J. K.; Zawawi, M. H.; Fuad, N. F. S.

    2017-09-01

    Rapid growth in car ownership in Malaysia plays a major role to traffic congestion. Hence, public transportation is crucial to cater the residents in high-density area especially in Klang Valley. Signage information in public transport station is one of an important passenger information system. Poor placement of sign information will decrease the efficiency of passenger flow and caused congestion in the station. Passenger information system is very useful for trip planning and decision making. Therefore, it is interesting to study the performance of passenger information system in focusing the movement behavior of pedestrian at non-peak period. Thus, the study on pedestrian movement during non-peak period on weekdays and weekends in mass transit stations and bus transit stations in Klang Valley was carried out by using video observation. The observation of the pedestrian movement was made in Mass Transit Station 1 in the middle of Kuala Lumpur and Mass Transit Station 2 in southern of Kuala Lumpur. The other site was focused at Bus Transit Station 1 in Putrajaya and Bus Transit Station 2 in Kajang. Findings shown that Mass Transit Station 1 having the best facility in terms of passenger information which the level of service obtained is LOS A, while the lowest level of service which is LOS E was obtained in Bus Transit Station 2.

  11. Expanding transportation systems management and operations (TSM&O) from planning to construction primer : [summary].

    DOT National Transportation Integrated Search

    2016-01-01

    Floridas increasing population leads to more road users of all types: pedestrians, cyclists, public : transit, trucks, and automobiles. Because funds and right-of-way are often unavailable to : increase highway capacity through expansion, effectiv...

  12. 48 CFR 212.7002 - Pilot program.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Pilot program. 212.7002... OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Pilot Program for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002 Pilot program. ...

  13. 48 CFR 212.7002 - Pilot program.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Pilot program. 212.7002... OF DEFENSE ACQUISITION PLANNING ACQUISITION OF COMMERCIAL ITEMS Pilot Program for Transition to Follow-On Contracting After Use of Other Transaction Authority 212.7002 Pilot program. ...

  14. Mass transit : review of the Tren Urbano finance plan

    DOT National Transportation Integrated Search

    2000-03-31

    In summary, we found that the Authority has sufficient funding to meet the expected cost of the project without seeking additional New Starts funds or adversely affecting other parts of the transportation system in Puerto Rico. To finance the project...

  15. Transitioning between Clerkship Directors

    ERIC Educational Resources Information Center

    Soltys, Stephen M.; Pary, Robert J.; Robinson, Stephen W.; Markwell, Stephen J.

    2011-01-01

    Objective: The authors report on succession-planning for mid-level academic positions. Method: The authors describe the process of succession-planning between clerkship directors and the smooth transition resulting in one case. Results: Gradually transitioning allowed a new faculty person to assume the clerkship-director position with minimal…

  16. Three Transits for the Price of One: Super-Earth Transits of the Nearest Planetary System Discovered By Kepler/K2

    NASA Astrophysics Data System (ADS)

    Redfield, Seth; Niraula, Prajwal; Hedges, Christina; Crossfield, Ian; Kreidberg, Laura; Greene, Tom; Rodriguez, Joey; Vanderburg, Andrew; Laughlin, Gregory; Millholland, Sarah; Wang, Songhu; Cochran, William; Livingston, John; Gandolfi, Davide; Guenther, Eike; Fridlund, Malcolm; Korth, Judith

    2018-05-01

    We propose primary transit observations of three Super-Earth planets in the newly discovered planetary system around a bright, nearby star, GJ 9827. We recently announced the detection of three super-Earth planets in 1:3:5 commensurability, the inner planet, GJ 9827 b having a period of 1.2 days. This is the nearest planetary system that Kepler or K2 has found, at 30 pc, and given its brightness is one of the top systems for follow-up characterization. This system presents a unique opportunity to acquire three planetary transits for the price of one. There are several opportunities in the Spitzer visibility windows to obtain all three transits in a short period of time. We propose 3.6 micron observations of all three Super-Earth transits in a single 18-hour observation window. The proximity to a 1:3:5 resonance is intriguing from a dynamical standpoint as well. Indeed, anomalous transit timing offsets have been measured for planet d in Hubble observations that suffer from partial phase coverage. The short cadence and extended coverage of Spitzer is essential to provide a firm determination of the ephemerides and characterize any transit timing variations. Constraining these orbital parameters is critical for follow-up observations from space and ground-based telescopes. Due to the brightness of the host star, this planetary system is likely to be extensively observed in the years to come. Indeed, our team has acquired observations of the planets orbiting GJ9827 with Hubble in the ultraviolet and infrared. The proposed observations will provide infrared atmospheric measurements and firm orbital characterization which is critical for planning and designing future observations, in particular atmospheric characterization with JWST.

  17. First down and goal to go. [Washington State resource applications for LANDSAT data

    NASA Technical Reports Server (NTRS)

    Little, G.

    1981-01-01

    A 10 year game plan for transition to the operational system was developed in the State of Washington. The plan is to: examine the results of past demonstration projects to identify successful operational applications, take advantage of geographic information systems, and work toward reducing/eliminating constraints of the present system which inhibit operational use. Support for the LANDSAT program was demonstrated by sending a user representative to NOAA working in the development of a user oriented system. It is suggested that the state should reassess its position, by taking advantage of the past 8 years' experience, and coordinate efforts to enhance LANDSAT' advantages in a cost effective manner.

  18. Entrepreneurial and Vocational Education and Training: Lessons from Eastern and Central Europe

    ERIC Educational Resources Information Center

    Mitra, Jay; Matlay, Harry

    2004-01-01

    The social, economic and political systems of former communist countries have faced considerable changes since the late 1980s. Most countries in Eastern and Central Europe have undergone their own individual brand of transition from a centrally planned, command system to a more or less liberalized, Western-style market economy. Many observers…

  19. 2008 Enterprise Transition Plan (ETP)

    DTIC Science & Technology

    2008-09-30

    of contract data to entitlement systems . • Close coordination with contracting office resulted in an increase in the successful electronic ...2005 to the Fall of 2007, the DBSMC approved funding for 304 individual systems , representing $7.5B in modernization investment funding. These...industry has developed the processes and learned its lessons from working in Africa for generations . Leveraging this experience is

  20. Multi-informant assessment of transition-related skills and skill importance in adolescents with autism spectrum disorder.

    PubMed

    Hume, Kara; Dykstra Steinbrenner, Jessica; Sideris, John; Smith, Leann; Kucharczyk, Suzanne; Szidon, Kate

    2018-01-01

    Adolescents with autism spectrum disorder have limited participation in the transition planning process, despite the link between active participation and an improvement in postsecondary education and employment outcomes. The Secondary School Success Checklist was designed to support transition planning for adolescents with autism spectrum disorder by incorporating their own assessments of strengths, skill deficits, and prioritization for instruction along with those of their parents and teachers across multiple skill domains. Findings from more than 500 adolescents with autism spectrum disorder across the United States indicate discrepancies between adolescent, teacher, and parent ratings of skills highlighting the importance of the inclusion of multiple perspectives in transition planning. Although ratings varied, agreement between adolescents with autism spectrum disorder, parents, and teachers across the highest and lowest rated skills suggests the need to broaden the focus on critical transition skills to include problem-solving, planning for life after high school, and self-advocacy.

  1. Psychologists and the Transition From Pediatrics to Adult Health Care.

    PubMed

    Gray, Wendy N; Monaghan, Maureen C; Gilleland Marchak, Jordan; Driscoll, Kimberly A; Hilliard, Marisa E

    2015-11-01

    Guidelines for optimal transition call for multidisciplinary teams, including psychologists, to address youth and young adults' multifactorial needs. This study aimed to characterize psychologists' roles in and barriers to involvement in transition from pediatric to adult health care. Psychologists were invited via professional listservs to complete an online survey about practice settings, roles in transition programming, barriers to involvement, and funding sources. Participants also responded to open-ended questions about their experiences in transition programs. One hundred participants responded to the survey. Involvement in transition was reported at multiple levels from individual patient care to institutional transition programming, and 65% reported more than one level of involvement. Direct clinical care (88%), transition-related research (50%), and/or leadership (44%) involvement were reported, with 59% reporting more than one role. Respondents often described advocating for their involvement on transition teams. Various sources of funding were reported, yet, 23% reported no funding for their work. Barriers to work in transition were common and included health care systems issues such as poor coordination among providers or lack of a clear transition plan within the clinic/institution. Psychologists assume numerous roles in the transition of adolescents from pediatric to adult health care. With training in health care transition-related issues, psychologists are ideally positioned to partner with other health professionals to develop and implement transition programs in multidisciplinary settings, provided health care system barriers can be overcome. Copyright © 2015 Society for Adolescent Health and Medicine. Published by Elsevier Inc. All rights reserved.

  2. Portable concrete barrier condition and transition plan synthesis.

    DOT National Transportation Integrated Search

    2012-06-01

    Precast (or portable) Concrete Barrier (PCB) is a guardrail system that is intended to contain and redirect a vehicle that has left the travel lane. Barrier connections are typically formed using steel wire or bar to form loops which are joined by a ...

  3. A methodology for incorporating fuel price impacts into short-term transit ridership forecasts.

    DOT National Transportation Integrated Search

    2009-08-01

    Anticipating changes to public transportation ridership demand is important to planning for and meeting : service goals and maintaining system viability. These changes may occur in the short- or long-term; : extensive academic work has focused on bet...

  4. Assessment of needs and research roadmaps for rechargeable energy storage system (RESS) onboard electric drive buses

    DOT National Transportation Integrated Search

    2010-12-01

    In support of the Federal Transit Administration (FTA) Electric Drive Strategic Plan (EDSP), this report assesses state-of-art advances in lithium-ion batteries, ultracapacitors, and related power management and control technologies for the rechargea...

  5. Tracking the deployment of the integrated metropolitan intelligent transportation systems infrastructure in The USA : FY99 results

    DOT National Transportation Integrated Search

    1998-09-16

    One of the new requirements of the Intermodal Surface Transportation Efficiency Act of 1991 is the requirement that State Departments of Transportation, Metropolitan Planning Organizations, and transit operators conduct a major investment study (MIS)...

  6. NG9-1-1 preliminary transition plan.

    DOT National Transportation Integrated Search

    2008-04-01

    Although the 9-1-1 system has been an unqualified success story for more than 30 years, changes in the : publics use of technology, the saturation of the mobile market, and the spread of Voice over Internet : Protocol (VoIP) telephony over broadba...

  7. Pegasus hypersonic flight research

    NASA Technical Reports Server (NTRS)

    Curry, Robert E.; Meyer, Robert R., Jr.; Budd, Gerald D.

    1992-01-01

    Hypersonic aeronautics research using the Pegasus air-launched space booster is described. Two areas are discussed in the paper: previously obtained results from Pegasus flights 1 and 2, and plans for future programs. Proposed future research includes boundary-layer transition studies on the airplane-like first stage and also use of the complete Pegasus launch system to boost a research vehicle to hypersonic speeds. Pegasus flight 1 and 2 measurements were used to evaluate the results of several analytical aerodynamic design tools applied during the development of the vehicle as well as to develop hypersonic flight-test techniques. These data indicated that the aerodynamic design approach for Pegasus was adequate and showed that acceptable margins were available. Additionally, the correlations provide insight into the capabilities of these analytical tools for more complex vehicles in which design margins may be more stringent. Near-term plans to conduct hypersonic boundary-layer transition studies are discussed. These plans involve the use of a smooth metallic glove at about the mid-span of the wing. Longer-term opportunities are proposed which identify advantages of the Pegasus launch system to boost large-scale research vehicles to the real-gas hypersonic flight regime.

  8. Transition Services: An Investigation of the Knowledge, Confidence, and Practice of Special Education Teachers in District of Columbia Public Charter High Schools

    ERIC Educational Resources Information Center

    Henry, Wallace R., III

    2015-01-01

    This study was intended to enhance the limited research on the knowledge and confidence of special education teachers in public education regarding transition services and the quality of transition plans they develop. The key variables examined in this study are knowledge, confidence, and the quality of student transition plans. The sample…

  9. Synthesis of Individual Transition Plans: Format and Process.

    ERIC Educational Resources Information Center

    La Mar, Kathleen; Rosenberg, Bill

    This document presents a prototype Individual Transition Plan (ITP) process and format for students receiving special education services. Following an overview of the role of transition, a section on the ITP process discusses pre-meeting activities, conducting an ITP meeting, monitoring and evaluating the ITP meeting, and a rationale for the…

  10. Planning the Transition to End-of-Life Care in Advanced Cancer (PDQ®)—Patient Version

    Cancer.gov

    Planning the transition to end-of-life care in advanced cancer involves talking about patient wishes and preferences. Learn more about common topics and how preparation for transition to end-of-life care can help ease the stress in patients and their families.

  11. Planning for School Transition: An Ecological-Developmental Approach.

    ERIC Educational Resources Information Center

    Diamond, Karen E.; And Others

    1988-01-01

    The paper describes an ecological-developmental model for planning a child's transition from a preschool special education program to a public school classroom. The model stresses interactions between the various environments in which the child functions. A description of a preschool transition program based on the model is also included.…

  12. Advanced network planning for bus rapid transit : the "Quickway" model as a modal alternative to "Light Rail Lite"

    DOT National Transportation Integrated Search

    2008-02-01

    Transit planning in the United States has tended toward viewing BRT as an analogue to light rail transit, with similar operating patterns. This model, referred to as Light Rail Lite, is compared to international best practices, which have often...

  13. Resource Allocation Planning Helper (RALPH): Lessons learned

    NASA Technical Reports Server (NTRS)

    Durham, Ralph; Reilly, Norman B.; Springer, Joe B.

    1990-01-01

    The current task of Resource Allocation Process includes the planning and apportionment of JPL's Ground Data System composed of the Deep Space Network and Mission Control and Computing Center facilities. The addition of the data driven, rule based planning system, RALPH, has expanded the planning horizon from 8 weeks to 10 years and has resulted in large labor savings. Use of the system has also resulted in important improvements in science return through enhanced resource utilization. In addition, RALPH has been instrumental in supporting rapid turn around for an increased volume of special what if studies. The status of RALPH is briefly reviewed and important lessons learned from the creation of an highly functional design team are focused on through an evolutionary design and implementation period in which an AI shell was selected, prototyped, and ultimately abandoned, and through the fundamental changes to the very process that spawned the tool kit. Principal topics include proper integration of software tools within the planning environment, transition from prototype to delivered to delivered software, changes in the planning methodology as a result of evolving software capabilities and creation of the ability to develop and process generic requirements to allow planning flexibility.

  14. A Generalized Timeline Representation, Services, and Interface for Automating Space Mission Operations

    NASA Technical Reports Server (NTRS)

    Chien, Steve A.; Johnston, Mark; Frank, Jeremy; Giuliano, Mark; Kavelaars, Alicia; Lenzen, Christoph; Policella, Nicola

    2012-01-01

    Numerous automated and semi-automated planning & scheduling systems have been developed for space applications. Most of these systems are model-based in that they encode domain knowledge necessary to predict spacecraft state and resources based on initial conditions and a proposed activity plan. The spacecraft state and resources as often modeled as a series of timelines, with a timeline or set of timelines to represent a state or resource key in the operations of the spacecraft. In this paper, we first describe a basic timeline representation that can represent a set of state, resource, timing, and transition constraints. We describe a number of planning and scheduling systems designed for space applications (and in many cases deployed for use of ongoing missions) and describe how they do and do not map onto this timeline model.

  15. AdaNET research project

    NASA Technical Reports Server (NTRS)

    Digman, R. Michael

    1988-01-01

    The components necessary for the success of the commercialization of an Ada Technology Transition Network are reported in detail. The organizational plan presents the planned structure for services development and technical transition of AdaNET services to potential user communities. The Business Plan is the operational plan for the AdaNET service as a commercial venture. The Technical Plan is the plan from which the AdaNET can be designed including detailed requirements analysis. Also contained is an analysis of user fees and charges, and a proposed user fee schedule.

  16. Automated and connected vehicle (AV/CV) test bed to improve transit, bicycle, and pedestrian safety : concept of operations plan.

    DOT National Transportation Integrated Search

    2017-02-01

    This document presents the Concept of Operations (ConOps) Plan for the Automated and Connected Vehicle (AV/CV) Test Bed to Improve Transit, Bicycle, and Pedestrian Safety. As illustrated in Figure 1, the plan presents the overarching vision and goals...

  17. IUS/TUG orbital operations and mission support study. Volume 3: Space tug operations

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A study was conducted to develop space tug operational concepts and baseline operations plan, and to provide cost estimates for space tug operations. Background data and study results are presented along with a transition phase analysis (the transition from interim upper state to tug operations). A summary is given of the tug operational and interface requirements with emphasis on the on-orbit checkout requirements, external interface operational requirements, safety requirements, and system operational interface requirements. Other topics discussed include reference missions baselined for the tug and details for the mission functional flows and timelines derived for the tug mission, tug subsystems, tug on-orbit operations prior to the tug first burn, spacecraft deployment and retrieval by the tug, operations centers, mission planning, potential problem areas, and cost data.

  18. Air quality impacts of transit improvement, preferential lane, and carpool/vanpool programs. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DiRenzo, J.F.; Rubin, R.B.

    1978-03-01

    The report was prepared in accordance with Section 108(f) of the Clean Air Act, as amended, August 1977. It is intended to assist urban areas in developing State Implementation Plans and integrating their transportation system management and air quality planning programs as required by FHWA, UMTA, and EPA. The report analyzes the air quality, travel, energy consumption, economic, and cost impacts of three types of transportation programs: priority treatment for high occupancy vehicles on freeways and arterials; areawide carpool and vanpool programs; and transit fare reductions and service improvements. Important factors (e.g., meteorological conditions, traffic volumes and speeds, and changesmore » in modal choice) likely to influence air quality and emissions for the above programs are also analyzed.« less

  19. Characterizing Rosetta Stone Exoplanets with JWST Transit Spectroscopy

    NASA Astrophysics Data System (ADS)

    Lewis, Nikole K.; Clampin, Mark; Seager, Sara; Valenti, Jeff A.; Mountain, Matt; JWST Telescope Scientist GTO Team

    2017-06-01

    JWST will for the first time provide for spectroscopic (R > 100) observation of systems hosting transiting exoplanets over the critical wavelength range from 0.6 to 28.5 microns. Our team will take advantage of JWST's spectral coverage and resolution to characterize a small number of exoplanets in exquisite detail. We plan to focus our efforts on single representative members of the hot-Jupiter, warm-Neptune, and temperate-Earth populations in both transmission and emission over the full wavelength range of JWST. Our JWST observations will hopefully become 'Rosetta Stones' that will serve as benchmarks for further observations of planets within each representative population and a lasting legacy of the JWST mission. Here we will describe our observational plan and how we turned our science goals into an implemented Cycle 1 JWST program.

  20. 75 FR 70966 - Transit Asset Management (TAM) Pilot Program

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-19

    ... interoperability between diverse types of information technology systems through use of open data formats and... to develop asset management plans, technical assistance, data collection and a pilot program as... condition assessment methodologies, as well as new data collection and analysis activities. $3 million has...

  1. A framework for developing and integrating effective routing strategies within the emergency management decision-support system : [research brief].

    DOT National Transportation Integrated Search

    2012-05-01

    The terrorist attacks on September 11th, as well as other coordinated attacks on transit centers in Madrid and London, have underscored the importance of evacuation planning to : transportation professionals. With computer technology advancement, urb...

  2. 14 CFR 135.345 - Pilots: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...; (9) Flight planning; (10) Each normal and emergency procedure; and (11) The approved Aircraft Flight... following, as applicable to their duties: (a) General subjects— (1) The certificate holder's flight locating...., flight controls, electrical, and hydraulic), other systems, as appropriate, principles of normal...

  3. 14 CFR 135.345 - Pilots: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...; (9) Flight planning; (10) Each normal and emergency procedure; and (11) The approved Aircraft Flight... following, as applicable to their duties: (a) General subjects— (1) The certificate holder's flight locating...., flight controls, electrical, and hydraulic), other systems, as appropriate, principles of normal...

  4. 14 CFR 135.345 - Pilots: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...; (9) Flight planning; (10) Each normal and emergency procedure; and (11) The approved Aircraft Flight... following, as applicable to their duties: (a) General subjects— (1) The certificate holder's flight locating...., flight controls, electrical, and hydraulic), other systems, as appropriate, principles of normal...

  5. 14 CFR 135.345 - Pilots: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...; (9) Flight planning; (10) Each normal and emergency procedure; and (11) The approved Aircraft Flight... following, as applicable to their duties: (a) General subjects— (1) The certificate holder's flight locating...., flight controls, electrical, and hydraulic), other systems, as appropriate, principles of normal...

  6. 14 CFR 135.345 - Pilots: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...; (9) Flight planning; (10) Each normal and emergency procedure; and (11) The approved Aircraft Flight... following, as applicable to their duties: (a) General subjects— (1) The certificate holder's flight locating...., flight controls, electrical, and hydraulic), other systems, as appropriate, principles of normal...

  7. 7 CFR 762.110 - Loan application.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... guarantees, plans to transition to organic or sustainable agriculture when the funds requested will be used... consideration for priority funding for CL guarantees, plans to transition to organic or sustainable agriculture...

  8. Methodology for urban rail and construction technology research and development planning

    NASA Technical Reports Server (NTRS)

    Rubenstein, L. D.; Land, J. E.; Deshpande, G.; Dayman, B.; Warren, E. H.

    1980-01-01

    A series of transit system visits, organized by the American Public Transit Association (APTA), was conducted in which the system operators identified the most pressing development needs. These varied by property and were reformulated into a series of potential projects. To assist in the evaluation, a data base useful for estimating the present capital and operating costs of various transit system elements was generated from published data. An evaluation model was developed which considered the rate of deployment of the research and development project, potential benefits, development time and cost. An outline of an evaluation methodology that considered benefits other than capital and operating cost savings was also presented. During the course of the study, five candidate projects were selected for detailed investigation; (1) air comfort systems; (2) solid state auxiliary power conditioners; (3) door systems; (4) escalators; and (5) fare collection systems. Application of the evaluation model to these five examples showed the usefulness of modeling deployment rates and indicated a need to increase the scope of the model to quantitatively consider reliability impacts.

  9. DARK Technology Transition Plan

    DTIC Science & Technology

    1990-04-01

    or suspend/resume primitives , and bounded delays. Under the above circumstances, the extra language features, and the hidden system calls they... system , this implies that the mechanisms by which units interact - to synchronise , communicate, schedule one another, or alert one another - should be...the Kernel environment are: " The host system is a DEC VAX operating under VMS 5.0 (the specific host used at the SEI is a MicroVAX II operating under

  10. Multi-Informant Assessment of Transition-Related Skills and Skill Importance in Adolescents with Autism Spectrum Disorder

    ERIC Educational Resources Information Center

    Hume, Kara; Dykstra Steinbrenner, Jessica; Sideris, John; Smith, Leann; Kucharczyk, Suzanne; Szidon, Kate

    2018-01-01

    Adolescents with autism spectrum disorder have limited participation in the transition planning process, despite the link between active participation and an improvement in postsecondary education and employment outcomes. The Secondary School Success Checklist was designed to support transition planning for adolescents with autism spectrum…

  11. Notes on Transition Planning for College. Practice Notes

    ERIC Educational Resources Information Center

    Center for Mental Health in Schools at UCLA, 2008

    2008-01-01

    All students can benefit from well-designed transition planning for college. With specific reference to those students identified for special education, middle and high schools have a responsibility under IDEA to focus on a range of transition interventions. Family stakeholders in a community need to work together to ensure the middle school and…

  12. Postsecondary Transition under IDEA 2004: A Legal Update

    ERIC Educational Resources Information Center

    Prince, Angela M. T.; Katsiyannis, Antonis; Farmer, Jennie

    2013-01-01

    Postsecondary transition planning for students with disabilities first entered the Individuals with Disabilities Education Act (IDEA) in 1990. The required provisions for transition planning were updated with the amendments to IDEA in 1997 and its reauthorization in 2004. Since IDEA 2004 took effect in July 2005, 11 court cases have been decided…

  13. Student Engagement and Leadership of the Transition Planning Process

    ERIC Educational Resources Information Center

    Martin, James E.; Williams-Diehm, Kendra

    2013-01-01

    The Council for Exceptional Children's Division on Career Development and Transition (DCDT) has been a longstanding leader and advocate in the field of secondary education for students with disabilities. This paper traces the history of student engagement in transition planning primarily through the lens of DCDT's journal "Career…

  14. Gathering Momentum! Transition from School to Work. Featuring Profiles of 23 Ohio Programs.

    ERIC Educational Resources Information Center

    Gifford, Bev

    This report examines the provisions of the School-to-Work Opportunities Act and describes the steps that have been taken thus far to establish an Ohio system. It discusses the general features that must be included in Ohio's school-to-work system and the strategies around which Ohio's school-to-work plans are being structured. Recommendations are…

  15. Transition from paediatric care to adult care for patients with mucopolysaccharidosis.

    PubMed

    Couce, M L; Del Toro, M; García-Jiménez, M C; Gutierrez-Solana, L; Hermida-Ameijeiras, Á; López-Rodríguez, M; Pérez-López, J; Torralba, M Á

    Mucopolysaccharidosis are multisystem diseases that require large multidisciplinary teams for their care. Specific recommendations are therefore needed for the transition from childhood to adulthood in this patient group. To overcome the barriers that might arise during the transition, the authors consider it essential to implement a flexible plan with a coordinator for the entire process, systematising the information through a standardised paediatric discharge report and educating the patient and their family about the disease, showing the characteristics of the healthcare system in this new stage. The final objective is that, once the transition to adulthood has been completed, the patient's autonomy and potential development are maximised and that the patient receives appropriate healthcare during this transition. Copyright © 2017 Elsevier España, S.L.U. and Sociedad Española de Medicina Interna (SEMI). All rights reserved.

  16. On-line estimations of delivered radiation doses in three-dimensional conformal radiotherapy treatments of carcinoma uterine cervix patients in linear accelerator

    PubMed Central

    Putha, Suman Kumar; Saxena, P. U.; Banerjee, S.; Srinivas, Challapalli; Vadhiraja, B. M.; Ravichandran, Ramamoorthy; Joan, Mary; Pai, K. Dinesh

    2016-01-01

    Transmission of radiation fluence through patient's body has a correlation to the planned target dose. A method to estimate the delivered dose to target volumes was standardized using a beam level 0.6 cc ionization chamber (IC) positioned at electronic portal imaging device (EPID) plane from the measured transit signal (St) in patients with cancer of uterine cervix treated with three-dimensional conformal radiotherapy (3DCRT). The IC with buildup cap was mounted on linear accelerator EPID frame with fixed source to chamber distance of 146.3 cm, using a locally fabricated mount. Sts were obtained for different water phantom thicknesses and radiation field sizes which were then used to generate a calibration table against calculated midplane doses at isocenter (Diso,TPS), derived from the treatment planning system. A code was developed using MATLAB software which was used to estimate the in vivo dose at isocenter (Diso,Transit) from the measured Sts. A locally fabricated pelvic phantom validated the estimations of Diso,Transit before implementing this method on actual patients. On-line dose estimations were made (3 times during treatment for each patient) in 24 patients. The Diso,Transit agreement with Diso,TPS in phantom was within 1.7% and the mean percentage deviation with standard deviation is −1.37% ±2.03% (n = 72) observed in patients. Estimated in vivo dose at isocenter with this method provides a good agreement with planned ones which can be implemented as part of quality assurance in pelvic sites treated with simple techniques, for example, 3DCRT where there is a need for documentation of planned dose delivery. PMID:28144114

  17. On-line estimations of delivered radiation doses in three-dimensional conformal radiotherapy treatments of carcinoma uterine cervix patients in linear accelerator.

    PubMed

    Putha, Suman Kumar; Saxena, P U; Banerjee, S; Srinivas, Challapalli; Vadhiraja, B M; Ravichandran, Ramamoorthy; Joan, Mary; Pai, K Dinesh

    2016-01-01

    Transmission of radiation fluence through patient's body has a correlation to the planned target dose. A method to estimate the delivered dose to target volumes was standardized using a beam level 0.6 cc ionization chamber (IC) positioned at electronic portal imaging device (EPID) plane from the measured transit signal (S t ) in patients with cancer of uterine cervix treated with three-dimensional conformal radiotherapy (3DCRT). The IC with buildup cap was mounted on linear accelerator EPID frame with fixed source to chamber distance of 146.3 cm, using a locally fabricated mount. S t s were obtained for different water phantom thicknesses and radiation field sizes which were then used to generate a calibration table against calculated midplane doses at isocenter (D iso,TPS ), derived from the treatment planning system. A code was developed using MATLAB software which was used to estimate the in vivo dose at isocenter (D iso,Transit ) from the measured S t s. A locally fabricated pelvic phantom validated the estimations of D iso,Transit before implementing this method on actual patients. On-line dose estimations were made (3 times during treatment for each patient) in 24 patients. The D iso,Transit agreement with D iso,TPS in phantom was within 1.7% and the mean percentage deviation with standard deviation is -1.37% ±2.03% ( n = 72) observed in patients. Estimated in vivo dose at isocenter with this method provides a good agreement with planned ones which can be implemented as part of quality assurance in pelvic sites treated with simple techniques, for example, 3DCRT where there is a need for documentation of planned dose delivery.

  18. Planning and Decision Making for Care Transitions

    PubMed Central

    Sörensen, Silvia; Mak, Wingyun; Pinquart, Martin

    2015-01-01

    The need to plan for future health care and residential adjustments increases with age, growing frailty, and restrictions in coverage of long-term care and will continue to grow with population aging. Older adults’ lack of financial preparation for health care costs, insufficient knowledge about available options, and inadequate communication about care-related values has become an increasing public health challenge. This chapter describes a model of Preparation for Future Care (PFC), which encompasses different levels and domains of planning. Research about the extent to which planning is helpful in navigating care transitions is reviewed, and barriers and facilitators of planning including individual, familial, cultural, and national long-term care policy factors are discussed. Planning in the context of dementia and practical approaches that can be taken to enhance PFC is addressed, as well as recommendations for future research in the area of planning and decision making in the context of care transitions. PMID:26207079

  19. Challenges of the Transition from Pediatric Care to Care of Adults: "Say Goodbye, Say Hello".

    PubMed

    Touraine, Philippe; Polak, Michel

    2018-01-01

    Transition has been defined as "the purposeful, planned movement of adolescents and young adults with chronic physical and medical conditions from child-centered to adult-oriented health care systems." We will here describe the challenges of such a process: challenges coming from the pediatrician, from the adolescent, linked to the disease itself, and those from the parents. We will outline how to overcome those fears and challenges to provide a successful transition process. A key factor to underline that process is that a relationship based on confidence should be established between the pediatrician and the physician for adults, in order for that relationship, based on trust, to be the basis for the transfer of the adolescent from the pediatric system of care to the adult one. © 2018 S. Karger AG, Basel.

  20. Transit management certificate program.

    DOT National Transportation Integrated Search

    2012-07-01

    TTI worked closely with the Landscape Architecture and Urban Planning Department : (LAUP) of Texas A&M University (TAMU) to develop a transit management certificate : focus for the current Graduate Certificate in Transportation Planning (CTP) housed ...

  1. Hybrid Electric Transit Bus

    NASA Technical Reports Server (NTRS)

    Viterna, Larry A.

    1997-01-01

    A government, industry, and university cooperative is developing an advanced hybrid electric city transit bus. Goals of this effort include doubling the fuel economy compared to current buses and reducing emissions to one-tenth of current EPA standards. Unique aspects of the vehicle's power system include the use of ultra-capacitors as an energy storage system, and a planned natural gas fueled turbogenerator developed from a small jet engine. Power from both the generator and energy storage system is provided to a variable speed electric motor attached to the rear axle. At over 15000 kg gross weight, this is the largest vehicle of its kind ever built using ultra-capacitor energy storage. This paper describes the overall power system architecture, the evolution of the control strategy, and its performance over industry standard drive cycles.

  2. Improving care planning and coordination for service users with medical co-morbidity transitioning between tertiary medical and primary care services.

    PubMed

    Cranwell, K; Polacsek, M; McCann, T V

    2017-08-01

    WHAT IS KNOWN ON THE SUBJECT?: Mental health service users with medical co-morbidity frequently experience difficulties accessing and receiving appropriate treatment in emergency departments. Service users frequently experience fragmented care planning and coordinating between tertiary medical and primary care services. Little is known about mental health nurses' perspectives about how to address these problems. WHAT THIS PAPER ADDS TO EXISTING KNOWLEDGE?: Emergency department clinicians' poor communication and negative attitudes have adverse effects on service users and the quality of care they receive. The findings contribute to the international evidence about mental health nurses' perspectives of service users feeling confused and frustrated in this situation, and improving coordination and continuity of care, facilitating transitions and increasing family and caregiver participation. Intervention studies are needed to evaluate if adoption of these measures leads to sustainable improvements in care planning and coordination, and how service users with medical co-morbidity are treated in emergency departments in particular. WHAT ARE THE IMPLICATIONS FOR PRACTICE?: Effective planning and coordination of care are essential to enable smooth transitions between tertiary medical (emergency departments in particular) and primary care services for service users with medical co-morbidity. Ongoing professional development education and support is needed for emergency department clinicians. There is also a need to develop an organized and systemic approach to improving service users' experience in emergency departments. Introduction Mental health service users with medical co-morbidity frequently experience difficulties accessing appropriate treatment in medical hospitals, and often there is poor collaboration within and between services. Little is known about mental health nurses' perspectives on how to address these problems. Aim To explore mental health nurses' perspectives of the experience of service users with medical co-morbidity in tertiary medical services, and to identify how to improve care planning and coordination for service users transitioning between tertiary medical and primary care services. Method Embedded within an experience-based co-design study, focus group discussions were conducted with 17 emergency department nurses and other clinicians, in Melbourne, Australia. Results Three main themes were abstracted from the data: feeling confused and frustrated, enhancing service users' transition and experience and involving families and caregivers. Participants perceived the service user experience to be characterized by fear, confusion and a sense of not being listened to. They highlighted that service users' transition and experience could be enhanced by facilitating transitions and improving coordination and continuity of care. They also emphasized the need to increase family and caregiver participation. Conclusion Our findings contribute to knowledge about improving the way service users are treated in emergency departments and improving care planning and coordination; in particular, facilitating transitions, improving coordination and continuity of care and increasing family and caregiver participation. © 2016 The Authors. Journal of Psychiatric and Mental Health Nursing Published by John Wiley & Sons Ltd.

  3. Reducing fatigue damage for ships in transit through structured decision making

    USGS Publications Warehouse

    Nichols, J.M.; Fackler, P.L.; Pacifici, K.; Murphy, K.D.; Nichols, J.D.

    2014-01-01

    Research in structural monitoring has focused primarily on drawing inference about the health of a structure from the structure’s response to ambient or applied excitation. Knowledge of the current state can then be used to predict structural integrity at a future time and, in principle, allows one to take action to improve safety, minimize ownership costs, and/or increase the operating envelope. While much time and effort has been devoted toward data collection and system identification, research to-date has largely avoided the question of how to choose an optimal maintenance plan. This work describes a structured decision making (SDM) process for taking available information (loading data, model output, etc.) and producing a plan of action for maintaining the structure. SDM allows the practitioner to specify his/her objectives and then solves for the decision that is optimal in the sense that it maximizes those objectives. To demonstrate, we consider the problem of a Naval vessel transiting a fixed distance in varying sea-state conditions. The physics of this problem are such that minimizing transit time increases the probability of fatigue failure in the structural supports. It is shown how SDM produces the optimal trip plan in the sense that it minimizes both transit time and probability of failure in the manner of our choosing (i.e., through a user-defined cost function). The example illustrates the benefit of SDM over heuristic approaches to maintaining the vessel.

  4. Transition and closeout of the Fernald Closure Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bilson, H.E.; Terry, T.; Reising, J.

    The U.S. Department of Energy (DOE) and Fluor Fernald have completed the majority of the cleanup of the Fernald Site. The over 1,000 acre complex for processing uranium has been demolished and soil contamination has been remediated. With acres of wetlands and prairies replacing the buildings and waste pits. At the end of the project the focus shifted to developing demonstrating the completion of the project and the contract, as well as ensuring a smooth transition of the facility from the DOE's Environmental Management (EM) Program to the DOE's Legacy Management (LM) Program. Working with the DOE, each portion ofmore » the closure contract was examined for specific closure definition. From this negotiation effort the Comprehensive Exit and Transition Plan (CE/T Plan) was written. The CE/T Plan is intended to assist DOE in the analysis that the site is ready for transfer into long-term stewardship (LTS) (also referred to as legacy management) and that Fluor Fernald, Inc. has satisfactorily completed the closure contract statement of work elements. Following the Lessons Learned from the closure of the Rocky Flats Site, the DOE's Legacy Management Program created a matrix of Transition Elements required to ensure adequate information was in place to allow the new prime contractor to perform the Legacy Management scope of work. The transition plan included over 1,000 elements broken down into functional areas and relied on specific Fernald Responsibility Transition Packages (RTPs) for detailed transition actions. The template for Closure and Transition Planning used at the Fernald Site was developed using the best Lessons Learned from across the DOE Complex. The template could be used for other sites, and lessons learned from this closure and transition will be appropriate for all closure projects. (authors)« less

  5. Sensors and signal processing for high accuracy passenger counting : final report.

    DOT National Transportation Integrated Search

    2009-03-05

    It is imperative for a transit system to track statistics about their ridership in order to plan bus routes. There exists a wide variety of methods for obtaining these statistics that range from relying on the driver to count people to utilizing came...

  6. Western Regional Remote Sensing Conference Proceedings, 1981

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Diverse applications of LANDSAT data, problem solutions, and operational goals are described by remote sensing users from 14 western states. The proposed FY82 federal budget reductions for technology transfer activities and the planned transition of the operational remote sensing system to NOAA's supervision are also considered.

  7. Strategic plan for coordinating rural intelligent transportation system (ITS) transit development in the Great Smoky Mountains National Park

    DOT National Transportation Integrated Search

    2002-11-01

    The Great Smoky Mountains National Park, located along the border between North Carolina and Tennessee, is the most visited national park in the United States. This rugged, mountainous area presents many transportation challenges. The immense popular...

  8. Los Angeles congestion reduction demonstration (Metro ExpressLanes) program. National evaluation : transit system data test plan.

    DOT National Transportation Integrated Search

    1998-09-01

    This flyer summarizes the activities and results of a preliminary human factors review for the Intelligent Vehicle Initiative (IVI) Program. As part of the IVI program, the Federal Highway Administration funded a project to investigate the human fact...

  9. Career Awareness, Career Planning, and Career Transition Needs among Sports Coaches

    ERIC Educational Resources Information Center

    Lavallee, David

    2006-01-01

    This study is conducted with 56 recently retired full-time sports coaches to examine the importance of career awareness, postsport career planning, and career transition needs. Results indicate that the individuals do not have a high level of career awareness, have done relatively little postsport career planning during their coaching careers, and…

  10. Preliminary experience with SpineEOS, a new software for 3D planning in AIS surgery.

    PubMed

    Ferrero, Emmanuelle; Mazda, Keyvan; Simon, Anne-Laure; Ilharreborde, Brice

    2018-04-24

    Preoperative planning of scoliosis surgery is essential in the effective treatment of spine pathology. Thus, precontoured rods have been recently developed to avoid iatrogenic sagittal misalignment and rod breakage. Some specific issues exist in adolescent idiopathic scoliosis (AIS), such as a less distal lower instrumented level, a great variability in the location of inflection point (transition from lumbar lordosis to thoracic kyphosis), and sagittal correction is limited by both bone-implant interface. Since 2007, stereoradiographic imaging system is used and allows for 3D reconstructions. Therefore, a software was developed to perform preoperative 3D surgical planning and to provide rod's shape and length. The goal of this preliminary study was to assess the feasibility, reliability, and the clinical relevance of this new software. Retrospective study on 47 AIS patients operated with the same surgical technique: posteromedial translation through posterior approach with lumbar screws and thoracic sublaminar bands. Pre- and postoperatively, 3D reconstructions were performed on stereoradiographic images (EOS system, Paris, France) and compared. Then, the software was used to plan the surgical correction and determine rod's shape and length. Simulated spine and rods were compared to postoperative real 3D reconstructions. 3D reconstructions and planning were performed by an independent observer. 3D simulations were performed on the 47 patients. No difference was found between the simulated model and the postoperative 3D reconstructions in terms of sagittal parameters. Postoperatively, 21% of LL were not within reference values. Postoperative SVA was 20 mm anterior in 2/3 of the cases. Postoperative rods were significantly longer than precontoured rods planned with the software (mean 10 mm). Inflection points were different on the rods used and the planned rods (2.3 levels on average). In this preliminary study, the software based on 3D stereoradiography low-dose system used to plan AIS surgery seems reliable for preoperative planning and precontoured rods. It is an interesting tool to improve surgeons' practice, since 3D planning is expected to reduce complications such as iatrogenic malalignment and to help for a better understanding of the complications, choosing the location of the transitional vertebra. However, further work is needed to improve thoracic kyphosis planning. These slides can be retrieved under Electronic Supplementary Material.

  11. Making the Transition to Post-Secondary Education: Opportunities and Challenges Experienced by Students with ASD in the Republic of Ireland

    ERIC Educational Resources Information Center

    Bell, Sheena; Devecchi, Cristina; Mc Guckin, Conor; Shevlin, Michael

    2017-01-01

    Internationally there are increasing numbers of young people on the ASD spectrum attending higher education. Early transition planning is essential and students with ASD often require support to articulate their post-school educational goals and actively participate in transition planning meetings. Services within higher education are primarily…

  12. "Leaps of Faith": Parents' and Professionals' Viewpoints on Preparing Adolescents on the Autism Spectrum for Leaving School

    ERIC Educational Resources Information Center

    Hatfield, Megan; Falkmer, Marita; Falkmer, Torbjorn; Ciccarelli, Marina

    2017-01-01

    Adolescents on the autism spectrum experience difficulty transitioning from secondary school to post-school activities, often due to transition planning processes that do not meet their unique needs. This study identified parents' and professionals' viewpoints on transition planning for adolescents on the autism spectrum. Interviews were completed…

  13. [The structure of financial planning of public health in Ukraine during the transitional period].

    PubMed

    Koretskiy, V L

    1995-01-01

    Based on the newly developed concept of multilevel functional system of primary health care which is to replace the current multicomponent system, the author discusses the computer-aided realization of the system for estimation and analysis of the integral model of outpatient and inpatient medical care of the population of the Ukraine. This system is intended to solve the problems associated with intensification of the resources of the public health system of the Republic (district).

  14. Program status

    NASA Technical Reports Server (NTRS)

    Smith, P.

    1986-01-01

    The Pilot Climate Data System (PCDS) was designed to support a variety of users that have been arbitrarily categorized into four groups: researchers, data producers, occasional users, and management. The expanding capabilities of the system are attracting the attention of both academic and other scientific institutions worldwide. Highlighted by progress in networking capabilities, hardware acquisitions, software developments, data set additions, and tutorial developments, exciting advances have taken place since the First PCDS Workshop. In the plans for the 1986 fiscal year, recommendations from an ad hoc users' group meeting in May 1985 and from the First PCDS workshop are apparent. This year's plans are listed, along with comments made at the users' group meeting. Although the PCDS is presently considered to be in a developmental phase, plans for making the transition to an operational phase are being implemented.

  15. Data Base Design with GIS in Ecosystem Based Multiple Use Forest Management in Artvin, Turkey: A Case Study in Balcı Forest Management Planning Unit.

    PubMed

    Yolasığmaz, Hacı Ahmet; Keleş, Sedat

    2009-01-01

    In Turkey, the understanding of planning focused on timber production has given its place on Multiple Use Management (MUM). Because the whole infrastructure of forestry with inventory system leading the way depends on timber production, some cases of bottle neck are expected during the transition period. Database design, probably the most important stage during the transition to MUM, together with the digital basic maps making up the basis of this infrastructure constitute the main point of this article. Firstly, the forest management philosophy of Turkey in the past was shortly touched upon in the article. Ecosystem Based Multiple Use Forest Management (EBMUFM) approaches was briefly introduced. The second stage of the process of EBMUFM, database design was described by examining the classical planning infrastructure and the coverage to be produced and consumed were suggested in the form of lists. At the application stage, two different geographical databases were established with GIS in Balcı Planning Unit of the years 1984 and 2006. Following that the related basic maps are produced. Timely diversity of the planning unit of 20 years is put forward comparatively with regard to the stand parameters such as tree types, age class, development stage, canopy closure, mixture, volume and increment.

  16. Information systems requirements for the Microgravity Science and Applications Program

    NASA Technical Reports Server (NTRS)

    Kicza, M. E.; Kreer, J. R.

    1991-01-01

    NASA's Microgravity Science and Applications (MSAD) Program is presented. Additionally, the types of information produced wiithin the program and the anticipated growth in information system requirements as the program transitions to Space Station Freedom utilization are discussed. Plans for payload operations support in the Freedom era are addressed, as well as current activities to define research community requirements for data and sample archives.

  17. Information systems requirements for the microgravity science and applications program

    NASA Technical Reports Server (NTRS)

    Kicza, M. E.; Kreer, J. R.

    1990-01-01

    NASA's Microgravity Science and Applications (MSAD) Program is presented. Additionally, the types of information produced within the program and the anticipated growth in information system requirements as the program transitions to Space Station Freedom utilization are discussed. Plans for payload operations support in the Freedom era are addressed, as well as current activities to define research community requirements for data and sample archives.

  18. Seeding the Cloud

    ERIC Educational Resources Information Center

    Schaffhauser, Dian

    2013-01-01

    For any institution looking to shift enterprise resource planning (ERP) systems to the cloud, big savings can be achieved--but only if the school has properly prepped "before" negotiations begin. These three steps can help: (1) Mop up the mess first; (2) Understand the true costs for services; and (3) Calculate the cost of transition.

  19. Personal Rapid Transit (PRT) : an Efficient and Long-Term Sustainable Traffic System. Analysis of a Demonstration Network in Stockholm

    DOT National Transportation Integrated Search

    1999-05-01

    On behalf of the Office of Regional Planning and Urban Transportation at the Stockholm County Council and with financial funding from KFB, Transek Consultants was commissioned to analyze conditions, market and economic viability of a Personal Rapid t...

  20. Building Enterprise Transition Plans Through the Development of Collapsing Design Structure Matrices

    DTIC Science & Technology

    2015-09-17

    processes from the earliest input to the final output to evaluate where change is needed to reduce costs, reduce waste, and improve the flow of information...from) integrating a large complex enterprise? • How should firms/enterprises evaluate systems prior to integration? What are some valid taxonomies

  1. 78 FR 18565 - Privacy Act of 1974; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-27

    ... action will be effective on April 29, 2013 unless comments are received which result in a contrary... Security Number, date of birth, job qualifications, DD Form 2648 (Pre-Separation Counseling Checklist), and... transition planning/counseling for individuals so that they may re-enter the civilian job market. Routine...

  2. 1990: Twenty-Second Annual National Council on Family Relations Media Awards Competition.

    ERIC Educational Resources Information Center

    Anson, Julie; And Others

    1991-01-01

    Describes winning videotapes and films of Media Competition in 12 categories: Human Development across the Life Span; Parenting Issues; Nontraditional Family Systems; Marital and Family Issues and Communication; Sexuality and Sex Role Development; Substance Abuse/Addiction; Human Reproduction and Family Planning; Stress, Transition, and Crisis…

  3. The intelligent transportation aystems public safety program : opportunities for technological advancement in detecting, responding and recovering from community emergencies

    DOT National Transportation Integrated Search

    1993-08-01

    This report is the third in a series produced for the Federal Transit Administration (FTA) and the Federal Highway Administration (FHWA) by the Volpe National Transportation Systems Center (Volpe Center). This formal, comprehensive review of the plan...

  4. Enterprise Resource Planning in Small and Medium Enterprises: Examining the Business Case

    ERIC Educational Resources Information Center

    Thompson, Millard A.

    2016-01-01

    Prior research pertaining to the behaviors that related to the acceptance and use of technology was primarily focused on individual end users with little concentration on the collective organizational perspective. Infrastructure changes in organizations developed as they transitioned from serviceable information technology systems to enterprise…

  5. An assessment of a 3D EPID-based dosimetry system using conventional two- and three-dimensional detectors for VMAT.

    PubMed

    Stevens, S; Dvorak, P; Spevacek, V; Pilarova, K; Bray-Parry, M; Gesner, J; Richmond, A

    2018-01-01

    To provide a 3D dosimetric evaluation of a commercial portal dosimetry system using 2D/3D detectors under ideal conditions using VMAT. A 2D ion chamber array, radiochromic film and gel dosimeter were utilised to provide a dosimetric evaluation of transit phantom and pre-treatment 'fluence' EPID back-projected dose distributions for a standard VMAT plan. In-house 2D and 3D gamma methods compared pass statistics relative to each dosimeter and TPS dose distributions. Fluence mode and transit EPID dose distributions back-projected onto phantom geometry produced 2D gamma pass rates in excess of 97% relative to other tested detectors and exported TPS dose planes when a 3%, 3 mm global gamma criterion was applied. Use of a gel dosimeter within a glass vial allowed comparison of measured 3D dose distributions versus EPID 3D dose and TPS calculated distributions. 3D gamma comparisons between modalities at 3%, 3 mm gave pass rates in excess of 92%. Use of fluence mode was indicative of transit results under ideal conditions with slightly reduced dose definition. 3D EPID back projected dose distributions were validated against detectors in both 2D and 3D. Cross validation of transit dose delivered to a patient is limited due to reasons of practicality and the tests presented are recommended as a guideline for 3D EPID dosimetry commissioning; allowing direct comparison between detector, TPS, fluence and transit modes. The results indicate achievable gamma scores for a complex VMAT plan in a homogenous phantom geometry and contributes to growing experience of 3D EPID dosimetry. Copyright © 2017 Associazione Italiana di Fisica Medica. Published by Elsevier Ltd. All rights reserved.

  6. The Impact of Professional Development on the Quality of the Transition Components of IEPs

    ERIC Educational Resources Information Center

    Flannery, K. Brigid; Lombardi, Allison; Kato, Mimi McGrath

    2015-01-01

    Under the Individuals With Disabilities Education Act (IDEA), transition needs and services are to be discussed as part of the Individual Education Program (IEP) planning process, and decisions based on students' future goals are to be documented in the IEP. These transition requirements were included in IDEA in order to plan with the student,…

  7. Transition to Parenthood and Conjugal Life: Comparisons between Planned and Unplanned Pregnancies

    ERIC Educational Resources Information Center

    Bouchard, Genevieve; Boudreau, Jolene; Hebert, Renee

    2006-01-01

    One of the variables that could explain the considerable variety of ways that adult couples handle the transition to parenthood is whether the pregnancy was planned or not. However, very little is known about the impact of pregnancy intendedness on the conjugal life of couples during this transition. The aim of this study was to address this gap…

  8. Ten Tips That May Help Ease Your Child's Transition to Adulthood. PHP-c107

    ERIC Educational Resources Information Center

    PACER Center, 2005

    2005-01-01

    Planning for a child's transition from adolescence to adulthood is one of the most important things a parent can do to pave the way to a successful future. In Minnesota, special education transition planning and services begin when a child with a disability is fourteen. From then on, parents and their children will start learning new skills…

  9. Process Evaluation of the Boost-A™ Transition Planning Program for Adolescents on the Autism Spectrum: A Strengths-Based Approach

    ERIC Educational Resources Information Center

    Hatfield, Megan; Falkmer, Marita; Falkmer, Torbjörn; Ciccarelli, Marina

    2018-01-01

    A process evaluation was conducted to determine the effectiveness, usability, and barriers and facilitators related to the Better OutcOmes & Successful Transitions for Autism (BOOST-A™), an online transition planning program. Adolescents on the autism spectrum (n = 33) and their parents (n = 39) provided feedback via an online questionnaire.…

  10. The Quality and Effects of Secondary Transition Plans on Special Education Graduates' Postsecondary Outcomes and Their Effects on Secondary Transition

    ERIC Educational Resources Information Center

    Miller, Vickie

    2013-01-01

    The purpose of the study was to determine whether or not the implementation of special education graduates' secondary transition plans by a team of supporters such as teachers, parents, administrators, and postsecondary mentors were well-constructed and in alignment with the graduates' high school curriculum and intended postsecondary goals, as…

  11. Identifying Evidence Based Transition Strategies and the Barriers to Effective Transition Planning for Students with Learning Disabilities

    ERIC Educational Resources Information Center

    Meade, Shawn Brooks

    2017-01-01

    Transition planning has become an important topic in special education because it is a method for ensuring that students with disabilities are best prepared for life after high school. Students with disabilities tend to have more challenges with postsecondary success when compared to their non-disabled peers. In particular, students with learning…

  12. The Effect of Transition Planning Participation and Goal-Setting on College Enrollment among Youth with Autism Spectrum Disorders

    ERIC Educational Resources Information Center

    Wei, Xin; Wagner, Mary; Hudson, Laura; Yu, Jennifer W.; Javitz, Harold

    2016-01-01

    This study used propensity score techniques to assess the relationship between transition planning participation and goal-setting and college enrollment among youth with Autism Spectrum Disorders. Using data from Waves 1 through 5 of the National Longitudinal Transition Study-2, this study found that 2- or 4-year college enrollment rates were…

  13. The Effect of Transition Planning and Goal-Setting on College Enrollment among Youth with Autism Spectrum Disorders

    ERIC Educational Resources Information Center

    Wei, Xin; Wagner, Mary; Hudson, Laura; Yu, Jennifer W.; Javitz, Harold

    2016-01-01

    This study used propensity score techniques to assess the relationship between transition planning participation and goal-setting and college enrollment among youth with Autism Spectrum Disorders (ASDs). Using data from waves 1 through 5 of the National Longitudinal Transition Study-2, this study found that 2- or 4-year college enrollment rates…

  14. Designing a gradual transition to a hydrogen economy in Spain

    NASA Astrophysics Data System (ADS)

    Brey, J. J.; Brey, R.; Carazo, A. F.; Contreras, I.; Hernández-Díaz, A. G.; Gallardo, V.

    The lack of sustainability of the current Spanish energy system makes it necessary to study the adoption of alternative energy models. One of these is what is known as the hydrogen economy. In this paper, we aim to plan, for the case of Spain, an initial phase for transition to this energy model making use of the potential offered by each Spanish region. Specifically, the target pursued is to satisfy at least 15% of energy demand for transport by 2010 through renewable sources. We plan to attain this target gradually, establishing intermediate stages consisting of supplying 5 and 10% of the energy demand for transport by 2006 and 2008, respectively. The results obtained allow us to determine, for each region, the hydrogen production and consumption, the renewable energy sources used to obtain hydrogen and the transport requirements between regions.

  15. Louisiana SIP: LAC 33:III Ch. 14 Subchap B, 1431 to 1434--Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded, or Approved Under Title 23 U.S.C. or the Federal Transit Laws

    EPA Pesticide Factsheets

    Louisiana SIP: LAC 33:III Ch. 14 Subchap B, 1431 to 1434--Conformity to State or Federal Implementation Plans of Transportation Plans, Programs, and Projects Developed, Funded, or Approved Under Title 23 U.S.C. or the Federal Transit Laws

  16. Planning for Post-Regime Change Environments: The Introduction of a Post-Regime Environment Planning Partnership (PREPP)

    DTIC Science & Technology

    2016-05-26

    makers. The third case study, on Nigeria , will provide an analysis of a peaceful transition of power. Finally, the structure for a proposed Post...15. SUBJECT TERMS Regime Change, National Security Council, Kosovo, Libya, Nigeria , transition of power, post-regime change planning. 16. SECURITY...conflation that exists between the planning element and politically appointed decision makers. The third case study, on Nigeria , will provide an analysis of

  17. A New Planning Template for Transit-Oriented Development

    DOT National Transportation Integrated Search

    2001-09-01

    The Mineta Transportation Institute (MTI) at San Josi State University assigned a project team to design a planning template for transit-oriented development (TOD) that incorporates an understanding of nonwork travel, that is, trips for shopping, eat...

  18. 5 CFR 330.711 - Oversight.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... PLACEMENT (GENERAL) Interagency Career Transition Assistance Plan for Displaced Employees § 330.711 Oversight. OPM is responsible for oversight of the Interagency Career Transition Assistance Plan for Displaced Employees and may conduct reviews of agency activity at any time. ...

  19. Back Disorder Intervention Strategies for Mass Transit Operators Exposed to Whole-Body VIBRATION—COMPARISON of Two Transit System Approaches and Practices

    NASA Astrophysics Data System (ADS)

    Johanning, E.

    1998-08-01

    Occupational long-term whole-body vibration (WBV) has been recognized as a major risk factor for low back disorders, one of the most important reasons for medical impairment and early permanent disability among mass transit operators. Although no firm health and safety vibration exposure threshold limits have been established, the available data suggests that rail vehicle operators would probably fall under the proposed WBV “action levels” of the EU directive provisions for protection from physical hazards. This provision calls for technical, administrative and medical controls. This paper examines and compares the current conditions, provisions and plans of two major mass transit systems, the New Yorker MTA and the Munich MVV. The available data, information and publications (English/German) on working conditions, vibration exposure, epidemiology and intervention strategies (primary and secondary prevention) for rail bound mass transit workers were reviewed. Results strongly suggest that the MTA transit system has currently and in the near future no effective and meaningful controls in place to significantly reduce the WBV exposure of subway operators. It appears that the MVV system has more and better control measures in place to reduce harmful effects of WBV. Results of a scientific evaluation of a participatory, collaborative project in the MVV system suggest that the MVV may have developed a successful method of a “condition prevention” (Verhältnisprävention)—and “behavioral prevention” (Verhaltensprävention) intervention strategy, which appears beneficial for WBV exposed workers with existing low back pain. Long-term outcomes and benefits need to be assessed further.

  20. PEPFAR Transitions to Country Ownership: Review of Past Donor Transitions and Application of Lessons Learned to the Eastern Caribbean

    PubMed Central

    Vogus, Abigail; Graff, Kylie

    2015-01-01

    The US President’s Emergency Plan for AIDS Relief (PEPFAR) has shifted from an emergency response to a sustainable, country-owned response. The process of transition to country ownership is already underway in the Eastern Caribbean; the Office of the US Global AIDS Coordinator (OGAC) has advised the region that PEPFAR funding is being redirected away from the Eastern Caribbean toward Caribbean countries with high disease burden to strengthen services for key populations. This article seeks to highlight and apply lessons learned from other donor transitions to support a successful transition of HIV programs in the Eastern Caribbean. Based on a rapid review of both peer-reviewed and gray literature on donor transitions to country ownership in family planning, HIV, and other areas, we identified 48 resources that addressed key steps in the transition process and determinants of readiness for transition. Analysis of the existing literature revealed 6 steps that could help ensure successful transition, including developing a clear roadmap articulated through high-level diplomacy; investing in extensive stakeholder engagement; and supporting monitoring and evaluation during and after the transition to adjust course as needed. Nine specific areas to assess a country’s readiness for transition include: leadership and management capacity, political and economic factors, the policy environment, identification of alternative funding sources, integration of HIV programs into the wider health system, the institutionalization of processes, the strength of procurement and supply chain management, identification of staffing and training needs, and engagement of civil society and the private sector. In the Caribbean, key areas requiring strengthening to ensure countries in the region can maintain the gains made under PEPFAR include further engaging civil society and the private sector, building the capacity of NGOs to take on essential program functions, and maintaining donor support for targeted capacity building and long-term monitoring and evaluation efforts. PMID:26085023

  1. Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Millard, W. David; Johnson, Daniel M.; Henderson, John M.

    2014-07-28

    Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedbackmore » during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.« less

  2. Planning for retirement from medicine: a mixed-methods study.

    PubMed

    Pannor Silver, Michelle; Easty, Laura K

    2017-01-01

    Evidence suggests there are important personal and social consequences associated with inadequate retirement planning for physicians. We evaluated whether academic physicians felt satisfied with their retirement planning, and identified obstacles to retirement planning and a set of factors to facilitate retirement planning. We applied a sequential mixed-methods research design to explore and examine factors that facilitate academic physician retirement planning using data collected from multiple sources (including 7 focus groups, an internet-based survey and 23 in-depth interviews). We examined survey results regarding retirement planning satisfaction and preferences for complete versus gradual retirement. We used thematic analysis to examine verbatim transcripts and notes from the focus groups and interviews. Survey data (response rate 51%) indicated that 10% of respondents were very satisfied with their retirement planning and 89.5% would prefer to retire gradually rather than stop work completely. Key barriers to retirement planning that emerged included poor personal financial management, rigid institutional structures and professional norms. Facilitators included financial planning resources for physicians at multiple career stages, opportunities and resources for later-career transitions and later-career mentorship support for intergenerational collaboration, and recognition of retirees. Key findings highlight perceived barriers to retirement planning at various career stages in addition to factors that can enhance physicians' retirement planning, including creating gradual and flexible retirement options, supporting ongoing discussions about financial planning and later career transitions, and fostering a culture that continues to honour and involve retirees. Medical institutions could foster innovative models for later-career transitions from medicine in ways that address physicians' needs at various career stages, support gradual transitions from practice and recognize the value of experienced, capable later-career physicians and retirees.

  3. Planning for retirement from medicine: a mixed-methods study

    PubMed Central

    Pannor Silver, Michelle; Easty, Laura K.

    2017-01-01

    Background: Evidence suggests there are important personal and social consequences associated with inadequate retirement planning for physicians. We evaluated whether academic physicians felt satisfied with their retirement planning, and identified obstacles to retirement planning and a set of factors to facilitate retirement planning. Methods: We applied a sequential mixed-methods research design to explore and examine factors that facilitate academic physician retirement planning using data collected from multiple sources (including 7 focus groups, an internet-based survey and 23 in-depth interviews). We examined survey results regarding retirement planning satisfaction and preferences for complete versus gradual retirement. We used thematic analysis to examine verbatim transcripts and notes from the focus groups and interviews. Results: Survey data (response rate 51%) indicated that 10% of respondents were very satisfied with their retirement planning and 89.5% would prefer to retire gradually rather than stop work completely. Key barriers to retirement planning that emerged included poor personal financial management, rigid institutional structures and professional norms. Facilitators included financial planning resources for physicians at multiple career stages, opportunities and resources for later-career transitions and later-career mentorship support for intergenerational collaboration, and recognition of retirees. Interpretation: Key findings highlight perceived barriers to retirement planning at various career stages in addition to factors that can enhance physicians' retirement planning, including creating gradual and flexible retirement options, supporting ongoing discussions about financial planning and later career transitions, and fostering a culture that continues to honour and involve retirees. Medical institutions could foster innovative models for later-career transitions from medicine in ways that address physicians' needs at various career stages, support gradual transitions from practice and recognize the value of experienced, capable later-career physicians and retirees. PMID:28401128

  4. The Transition of NASA EOS Datasets to WFO Operations: A Model for Future Technology Transfer

    NASA Technical Reports Server (NTRS)

    Darden, C.; Burks, J.; Jedlovec, G.; Haines, S.

    2007-01-01

    The collocation of a National Weather Service (NWS) Forecast Office with atmospheric scientists from NASA/Marshall Space Flight Center (MSFC) in Huntsville, Alabama has afforded a unique opportunity for science sharing and technology transfer. Specifically, the NWS office in Huntsville has interacted closely with research scientists within the SPORT (Short-term Prediction and Research and Transition) Center at MSFC. One significant technology transfer that has reaped dividends is the transition of unique NASA EOS polar orbiting datasets into NWS field operations. NWS forecasters primarily rely on the AWIPS (Advanced Weather Information and Processing System) decision support system for their day to day forecast and warning decision making. Unfortunately, the transition of data from operational polar orbiters or low inclination orbiting satellites into AWIPS has been relatively slow due to a variety of reasons. The ability to integrate these high resolution NASA datasets into operations has yielded several benefits. The MODIS (MODerate-resolution Imaging Spectrometer ) instrument flying on the Aqua and Terra satellites provides a broad spectrum of multispectral observations at resolutions as fine as 250m. Forecasters routinely utilize these datasets to locate fine lines, boundaries, smoke plumes, locations of fog or haze fields, and other mesoscale features. In addition, these important datasets have been transitioned to other WFOs for a variety of local uses. For instance, WFO Great Falls Montana utilizes the MODIS snow cover product for hydrologic planning purposes while several coastal offices utilize the output from the MODIS and AMSR-E instruments to supplement observations in the data sparse regions of the Gulf of Mexico and western Atlantic. In the short term, these datasets have benefited local WFOs in a variety of ways. In the longer term, the process by which these unique datasets were successfully transitioned to operations will benefit the planning and implementation of products and datasets derived from both NPP and NPOESS. This presentation will provide a brief overview of current WFO usage of satellite data, the transition of datasets between SPORT and the N W S , and lessons learned for future transition efforts.

  5. Preliminary design of a solar central receiver for a site-specific repowering application (Saguaro Power Plant). Volume IV. Appendixes. Final report, October 1982-September 1983

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weber, E.R.

    1983-09-01

    The appendixes for the Saguaro Power Plant includes the following: receiver configuration selection report; cooperating modes and transitions; failure modes analysis; control system analysis; computer codes and simulation models; procurement package scope descriptions; responsibility matrix; solar system flow diagram component purpose list; thermal storage component and system test plans; solar steam generator tube-to-tubesheet weld analysis; pipeline listing; management control schedule; and system list and definitions.

  6. Modeling and Control of a Fixed Wing Tilt-Rotor Tri-Copter

    NASA Astrophysics Data System (ADS)

    Summers, Alexander

    The following thesis considers modeling and control of a fixed wing tilt-rotor tri-copter. An emphasis of the conceptual design is made toward payload transport. Aerodynamic panel code and CAD design provide the base aerodynamic, geometric, mass, and inertia properties. A set of non-linear dynamics are created considering gravity, aerodynamics in vertical takeoff and landing (VTOL) and forward flight, and propulsion applied to a three degree of freedom system. A transition strategy, that removes trajectory planning by means of scheduled inputs, is theorized. Three discrete controllers, utilizing separate control techniques, are applied to ensure stability in the aerodynamic regions of VTOL, transition, and forward flight. The controller techniques include linear quadratic regulation, full state integral action, gain scheduling, and proportional integral derivative (PID) flight control. Simulation of the model control system for flight from forward to backward transition is completed with mass and center of gravity variation.

  7. Awards to academic institutions by the Department of Transportation in FY 1975

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Megerian, G.K.; Whitfield, H.L.

    1976-02-20

    A comprehensive listing is given of contracts and grants awarded by the Department of Transportation to colleges and universities during fiscal year 1975. The awards are categorized into seven different schemes. Subject areas include (1) carpooling; (2) problems of the elderly and the handicapped; (3) energy; (4) environment; (5) facilities and services; (6) Federal Government role; (7) freight movement; (8) human factors; (9) land use planning; (10) management; (11) materials; (12) motorcycles; (13) noise; (14) personal rapid transit; (15) rural planning; (16) safety; (17) systems development; (18) taxicabs; (19) technology; (20) traffic control; (21) training; (22) tunneling; and (23) urbanmore » planning. (PMA)« less

  8. Transit Station Renovation: A Case Study of Planning and Design Procedures

    DOT National Transportation Integrated Search

    1979-06-01

    The general techniques and procedures for planning and evaluating transit : interface facilities are applied comprehensively to the problem of station : renovation. The 69th Street Terminal in Philadelphia is evaluated in terms of : its performance i...

  9. Overview of the Turbine Based Combined Cycle Discipline

    NASA Technical Reports Server (NTRS)

    Thomas, Scott R.; Walker, James F.; Pittman, James L.

    2009-01-01

    The NASA Fundamental Aeronautics Hypersonics project is focused on technologies for combined cycle, airbreathing propulsions systems to enable reusable launch systems for access to space. Turbine Based Combined Cycle (TBCC) propulsion systems offer specific impulse (Isp) improvements over rocket-based propulsion systems in the subsonic takeoff and return mission segments and offer improved safety. The potential to realize more aircraft-like operations with expanded launch site capability and reduced system maintenance are additional benefits. The most critical TBCC enabling technologies as identified in the National Aeronautics Institute (NAI) study were: 1) mode transition from the low speed propulsion system to the high speed propulsion system, 2) high Mach turbine engine development, 3) transonic aero-propulsion performance, 4) low-Mach-number dual-mode scramjet operation, 5) innovative 3-D flowpath concepts and 6) innovative turbine based combined cycle integration. To address several of these key TBCC challenges, NASA s Hypersonics project (TBCC Discipline) initiated an experimental mode transition task that includes an analytic research endeavor to assess the state-of-the-art of propulsion system performance and design codes. This initiative includes inlet fluid and turbine performance codes and engineering-level algorithms. This effort has been focused on the Combined Cycle Engine Large-Scale Inlet Mode Transition Experiment (CCE LIMX) which is a fully integrated TBCC propulsion system with flow path sizing consistent with previous NASA and DoD proposed Hypersonic experimental flight test plans. This experiment is being tested in the NASA-GRC 10 x 10 Supersonic Wind Tunnel (SWT) Facility. The goal of this activity is to address key hypersonic combined-cycle-engine issues: (1) dual integrated inlet operability and performance issues unstart constraints, distortion constraints, bleed requirements, controls, and operability margins, (2) mode-transition constraints imposed by the turbine and the ramjet/scramjet flow paths (imposed variable geometry requirements), (3) turbine engine transients (and associated time scales) during transition, (4) high-altitude turbine engine re-light, and (5) the operating constraints of a Mach 3-7 combustor (specific to the TBCC). The model will be tested in several test phases to develop a unique TBCC database to assess and validate design and analysis tools and address operability, integration, and interaction issues for this class of advanced propulsion systems. The test article and all support equipment is complete and available at the facility. The test article installation and facility build-up in preparation for the inlet performance and operability characterization is near completion and testing is planned to commence in FY11.

  10. His and Her Job: What Matters Most for Fertility Plans and Actual Childbearing?

    ERIC Educational Resources Information Center

    Kaufman, Gayle; Bernhardt, Eva

    2012-01-01

    This study examines workplace culture and fertility plans and transitions in Sweden. This study goes beyond previous research in examining the effect of particular job characteristics as well as the influence of a partner's job characteristics on women's and men's birth plans and transitions. We use data from the 1999 and 2003 Swedish Young Adult…

  11. The Change of Planned Happenstance Skills and Its Association with Career-Related Variables during School-to-Work Transition

    ERIC Educational Resources Information Center

    Yang, NaYeon; Yaung, Huk; Noh, Hyunkyung; Jang, Sun Hee; Lee, Bora

    2017-01-01

    The current study examined how planned happenstance skills (i.e., curiosity, flexibility, persistence, optimism, and risk-taking) changed during school-to-work transition and how career-related variables were associated with the initial levels and change rates of planned happenstance skills. In a sample of 307 South Korean college students, all…

  12. Transitioning HIV-infected youth into adult health care.

    PubMed

    2013-07-01

    With advances in antiretroviral therapy, most HIV-infected children survive into adulthood. Optimal health care for these youth includes a formal plan for the transition of care from primary and/or subspecialty pediatric/adolescent/family medicine health care providers (medical home) to adult health care provider(s). Successful transition involves the early engagement and participation of the youth and his or her family with the pediatric medical home and adult health care teams in developing a formal plan. Referring providers should have a written policy for the transfer of HIV-infected youth to adult care, which will guide in the development of an individualized plan for each youth. The plan should be introduced to the youth in early adolescence and modified as the youth approaches transition. Assessment of developmental milestones is important to define the readiness of the youth in assuming responsibility for his or her own care before initiating the transfer. Communication among all providers is essential and should include both personal contact and a written medical summary. Progress toward the transition should be tracked and,once completed, should be documented and assessed.

  13. An Examination of the Impact of the IEP Team Composition and Transition Planning upon the Success of Students with Disabilities in Urban Districts

    ERIC Educational Resources Information Center

    Hill, Petrina D.

    2010-01-01

    The primary purpose of this correlational study was to examine the impact of IEP team composition (team member attendance) and transition planning (types of transition outcomes) upon the success (graduation) of students with disabilities in urban districts. Other factors also included gender, academic status of school, socioeconomic status of the…

  14. Articulating Roles and Responsibilities in the Transition Planning Process: A Practice Aimed at Figuring out How to Work Together. Transitions

    ERIC Educational Resources Information Center

    Murphy, Marianne; Golden, Thomas

    2004-01-01

    It is clear that the intention of the Rehabilitation Act of 1973 and the Individual with Disabilities Education Act of 1997 require both the Education Agency and the Vocational Rehabilitation Agency (VESID, in New York State) to jointly participate in the development of transition plans for students with disabilities as they prepare for employment…

  15. Students with Reading and Writing Challenges: Using Informal Assessment to Assist in Planning for the Transition to Adult Life

    ERIC Educational Resources Information Center

    Sitlington, Patricia L.

    2008-01-01

    The transition to adult life for students with reading and writing challenges is an area that is not often addressed. The purpose of this article is to relate the informal assessment process to the broader context of high stakes assessment, high school exit exams, diploma options, and transition planning; identify the competencies needed for a…

  16. Clinical Experience and Evaluation of Patient Treatment Verification With a Transit Dosimeter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ricketts, Kate, E-mail: k.ricketts@ucl.ac.uk; Department of Radiotherapy Physics, Royal Berkshire NHS Foundation Trust, Reading; Navarro, Clara

    2016-08-01

    Purpose: To prospectively evaluate a protocol for transit dosimetry on a patient population undergoing intensity modulated radiation therapy (IMRT) and to assess the issues in clinical implementation of electronic portal imaging devices (EPIDs) for treatment verification. Methods and Materials: Fifty-eight patients were enrolled in the study. Amorphous silicon EPIDs were calibrated for dose and used to acquire images of delivered fields. Measured EPID dose maps were back-projected using the planning computed tomographic (CT) images to calculate dose at prespecified points within the patient and compared with treatment planning system dose offline using point dose difference and point γ analysis. Themore » deviation of the results was used to inform future action levels. Results: Two hundred twenty-five transit images were analyzed, composed of breast, prostate, and head and neck IMRT fields. Patient measurements demonstrated the potential of the dose verification protocol to model dose well under complex conditions: 83.8% of all delivered beams achieved the initial set tolerance level of Δ{sub D} of 0 ± 5 cGy or %Δ{sub D} of 0% ± 5%. Importantly, the protocol was also sensitive to anatomic changes and spotted that 3 patients from 20 measured prostate patients had undergone anatomic change in comparison with the planning CT. Patient data suggested an EPID-reconstructed versus treatment planning system dose difference action level of 0% ± 7% for breast fields. Asymmetric action levels were more appropriate for inversed IMRT fields, using absolute dose difference (−2 ± 5 cGy) or summed field percentage dose difference (−6% ± 7%). Conclusions: The in vivo dose verification method was easy to use and simple to implement, and it could detect patient anatomic changes that impacted dose delivery. The system required no extra dose to the patient or treatment time delay and so could be used throughout the course of treatment to identify and limit systematic and random errors in dose delivery for patient groups.« less

  17. Clinical Experience and Evaluation of Patient Treatment Verification With a Transit Dosimeter.

    PubMed

    Ricketts, Kate; Navarro, Clara; Lane, Katherine; Blowfield, Claire; Cotten, Gary; Tomala, Dee; Lord, Christine; Jones, Joanne; Adeyemi, Abiodun

    2016-08-01

    To prospectively evaluate a protocol for transit dosimetry on a patient population undergoing intensity modulated radiation therapy (IMRT) and to assess the issues in clinical implementation of electronic portal imaging devices (EPIDs) for treatment verification. Fifty-eight patients were enrolled in the study. Amorphous silicon EPIDs were calibrated for dose and used to acquire images of delivered fields. Measured EPID dose maps were back-projected using the planning computed tomographic (CT) images to calculate dose at prespecified points within the patient and compared with treatment planning system dose offline using point dose difference and point γ analysis. The deviation of the results was used to inform future action levels. Two hundred twenty-five transit images were analyzed, composed of breast, prostate, and head and neck IMRT fields. Patient measurements demonstrated the potential of the dose verification protocol to model dose well under complex conditions: 83.8% of all delivered beams achieved the initial set tolerance level of ΔD of 0 ± 5 cGy or %ΔD of 0% ± 5%. Importantly, the protocol was also sensitive to anatomic changes and spotted that 3 patients from 20 measured prostate patients had undergone anatomic change in comparison with the planning CT. Patient data suggested an EPID-reconstructed versus treatment planning system dose difference action level of 0% ± 7% for breast fields. Asymmetric action levels were more appropriate for inversed IMRT fields, using absolute dose difference (-2 ± 5 cGy) or summed field percentage dose difference (-6% ± 7%). The in vivo dose verification method was easy to use and simple to implement, and it could detect patient anatomic changes that impacted dose delivery. The system required no extra dose to the patient or treatment time delay and so could be used throughout the course of treatment to identify and limit systematic and random errors in dose delivery for patient groups. Copyright © 2016 Elsevier Inc. All rights reserved.

  18. National study on carless and special needs populations mobilizing your community for emergency evacuation.

    DOT National Transportation Integrated Search

    2012-12-01

    The National Study on Carless and Special Needs Evacuation Planning was a multi-year study funded by the Federal Transit Administration : to research how state Departments of Transportation (DOTs), metropolitan planning organizations (MPOs), transit ...

  19. America's Next Great Ship: Space Launch System Core Stage Transitioning from Design to Manufacturing

    NASA Technical Reports Server (NTRS)

    Birkenstock, Benjamin; Kauer, Roy

    2014-01-01

    The Space Launch System (SLS) Program is essential to achieving the Nation's and NASA's goal of human exploration and scientific investigation of the solar system. As a multi-element program with emphasis on safety, affordability, and sustainability, SLS is becoming America's next great ship of exploration. The SLS Core Stage includes avionics, main propulsion system, pressure vessels, thrust vector control, and structures. Boeing manufactures and assembles the SLS core stage at the Michoud Assembly Facility (MAF) in New Orleans, LA, a historical production center for Saturn V and Space Shuttle programs. As the transition from design to manufacturing progresses, the importance of a well-executed manufacturing, assembly, and operation (MA&O) plan is crucial to meeting performance objectives. Boeing employs classic techniques such as critical path analysis and facility requirements definition as well as innovative approaches such as Constraint Based Scheduling (CBS) and Cirtical Chain Project Management (CCPM) theory to provide a comprehensive suite of project management tools to manage the health of the baseline plan on both a macro (overall project) and micro level (factory areas). These tools coordinate data from multiple business systems and provide a robust network to support Material & Capacity Requirements Planning (MRP/CRP) and priorities. Coupled with these tools and a highly skilled workforce, Boeing is orchestrating the parallel buildup of five major sub assemblies throughout the factory. Boeing and NASA are transforming MAF to host state of the art processes, equipment and tooling, the most prominent of which is the Vertical Assembly Center (VAC), the largest weld tool in the world. In concert, a global supply chain is delivering a range of structural elements and component parts necessary to enable an on-time delivery of the integrated Core Stage. SLS is on plan to launch humanity into the next phase of space exploration.

  20. Integration and baseline management training and transition plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jech, J.B.

    The purpose of the Integration and Baseline Management Training and Transition Plan is to provide a training outline for the Integration and Baseline Management (I and BM) organization and a transition strategy for the Master Equipment List (MEL) Phase 1 application. The training outline includes the following courses: MEL Phase 1 Application Course 1 Master Equipment List General Overview. Course 2 Master Equipment List Editing. Tank Waste Remediation System (TWRS) Labeling Related Course 3 TWRS Equipment Labeling Program (Course Number 350545). As part of courses 1, 2, and 3, it is recommended that a lesson plan be developed and integratedmore » into each of the three courses on the subject of Configuration Management (CM) to include: CM concepts, terminology, definitions, fundamentals and its application with respect to the course. The strategy for the MEL Phase 1 application is to train internal organizations (I and BM) on the MEL-General Overview for read only users and train MEL-Editing for edit users (only on an as needed basis). For external organizations, the strategy is to train selected personnel on the MEL-General Overview and transition them from read only privileges to editing privileges when the appropriate administrative procedures that outline the external organization`s responsibilities (to support MEL) are established. The purpose of this training is to ensure support of the I and BM organization objectives within the TV,IRS Division. These training courses will be added to the existing required training for I and BM personnel only. Other organizations implementing the training will be directed by their management on which training is required.« less

  1. Transit emergency planning guidance.

    DOT National Transportation Integrated Search

    2007-07-01

    Providing safe, reliable transportation has long been a priority at all levels of : the transit industry including the Federal Transit Administration (FTA), : state Departments of Transportation and individual transit providers. Over the : last decad...

  2. Ground-based search for the brightest transiting planets with the Multi-site All-Sky CAmeRA: MASCARA

    NASA Astrophysics Data System (ADS)

    Snellen, Ignas A. G.; Stuik, Remko; Navarro, Ramon; Bettonvil, Felix; Kenworthy, Matthew; de Mooij, Ernst; Otten, Gilles; ter Horst, Rik; le Poole, Rudolf

    2012-09-01

    The Multi-site All-sky CAmeRA MASCARA is an instrument concept consisting of several stations across the globe, with each station containing a battery of low-cost cameras to monitor the near-entire sky at each location. Once all stations have been installed, MASCARA will be able to provide a nearly 24-hr coverage of the complete dark sky, down to magnitude 8, at sub-minute cadence. Its purpose is to find the brightest transiting exoplanet systems, expected in the V=4-8 magnitude range - currently not probed by space- or ground-based surveys. The bright/nearby transiting planet systems, which MASCARA will discover, will be the key targets for detailed planet atmosphere observations. We present studies on the initial design of a MASCARA station, including the camera housing, domes, and computer equipment, and on the photometric stability of low-cost cameras showing that a precision of 0.3-1% per hour can be readily achieved. We plan to roll out the first MASCARA station before the end of 2013. A 5-station MASCARA can within two years discover up to a dozen of the brightest transiting planet systems in the sky.

  3. Market-Based and System-Wide Fuel Cycle Optimization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wilson, Paul Philip Hood; Scopatz, Anthony; Gidden, Matthew

    This work introduces automated optimization into fuel cycle simulations in the Cyclus platform. This includes system-level optimizations, seeking a deployment plan that optimizes the performance over the entire transition, and market-level optimization, seeking an optimal set of material trades at each time step. These concepts were introduced in a way that preserves the flexibility of the Cyclus fuel cycle framework, one of its most important design principles.

  4. Transition of Army Ground Systems from Production to Sustainment

    DTIC Science & Technology

    2016-04-03

    Management in partial fulfillment of the degree of Master of Global Leadership and Management Submitted to Defense Acquisition University in...gathered from the survey was analyzed using descriptive statistics for correlations among the data collected, and to analyze items that were grouped...that is used as a detailed plan to describe how the system will be sustained. LCSP’s include how sustainment activity metrics will be determined

  5. Strategic Mobility 21 Transition Plan: From Research Federation to Business Enterprise

    DTIC Science & Technology

    2010-12-31

    Transportation Management System (GTMS), Service Oriented Architecture (SOA), Service -as-a- Software ( SaaS ), Joint Capability Technolgoy Demonstration...the Software -as-a- Service ( SaaS ) format, whereby users access the application with the appropriate Internet authorizations. Security is provided by...integrating best-of-breed dual-use systems deployed in the software as a service ( SaaS ) environment. It includes single sign-on capabilities and was

  6. Socio-Environmental Resilience and Complex Urban Systems Modeling

    NASA Astrophysics Data System (ADS)

    Deal, Brian; Petri, Aaron; Pan, Haozhi; Goldenberg, Romain; Kalantari, Zahra; Cvetkovic, Vladimir

    2017-04-01

    The increasing pressure of climate change has inspired two normative agendas; socio-technical transitions and socio-ecological resilience, both sharing a complex-systems epistemology (Gillard et al. 2016). Socio-technical solutions include a continuous, massive data gathering exercise now underway in urban places under the guise of developing a 'smart'(er) city. This has led to the creation of data-rich environments where large data sets have become central to monitoring and forming a response to anomalies. Some have argued that these kinds of data sets can help in planning for resilient cities (Norberg and Cumming 2008; Batty 2013). In this paper, we focus on a more nuanced, ecologically based, socio-environmental perspective of resilience planning that is often given less consideration. Here, we broadly discuss (and model) the tightly linked, mutually influenced, social and biophysical subsystems that are critical for understanding urban resilience. We argue for the need to incorporate these sub system linkages into the resilience planning lexicon through the integration of systems models and planning support systems. We make our case by first providing a context for urban resilience from a socio-ecological and planning perspective. We highlight the data needs for this type of resilient planning and compare it to currently collected data streams in various smart city efforts. This helps to define an approach for operationalizing socio-environmental resilience planning using robust systems models and planning support systems. For this, we draw from our experiences in coupling a spatio-temporal land use model (the Landuse Evolution and impact Assessment Model (LEAM)) with water quality and quantity models in Stockholm Sweden. We describe the coupling of these systems models using a robust Planning Support System (PSS) structural framework. We use the coupled model simulations and PSS to analyze the connection between urban land use transformation (social) and water (environmental) systems within the context of planning for a more resilient Stockholm. This work shows that complex urban systems models can help bridge the divide between socio-technological and socio-environmental systems knowledge and achieving resilient urban areas.

  7. Dallas area rapid transit LRT starter line assessment study design. Final research report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shunk, G.A.; Turnbull, K.F.; Lindquist, N.F.

    1995-03-01

    Light rail transit (LRT) systems have recently been implemented in a number of urban areas throughout the United States and additional projects are in various stages of planning and development. Questions have been raised concerning the impact of these systems on ridership levels, transit operating costs, regional mobility, land use, economic development, energy, air quality, congestion levels, and other factors. The implementation of the Dallas Area Rapid Transit (DART) LRT starter line provides the opportunity to assess the impact of an LRT system in a Southwestern city in the United States. This research project was undertaken to assist with themore » development of a comprehensive study design for assessing the effects of the DART LRT starter line. To accomplish this objective, a review was conducted of before-and-after studies of recent LRT, heavy rail, and high-occupancy vehicle (HOV) projects. The goals and objectives of the DART system were also reviewed and existing transportation-related data collection activities in the Dallas area were examined. This information was used to develop a preliminary study design for assessing the effects of the DART LRT starter line. This report documents the review of recent before-and-after studies and presents the preliminary study design for assessing the effects of the DART LRT starter line.« less

  8. Rural transit emergency planning guidance.

    DOT National Transportation Integrated Search

    2008-07-01

    Providing safe, reliable transportation has long been a priority at all levels of the transit industry including the Federal Transit Administration (FTA), California Department of Transportation (Caltrans) and individual transit providers. Over the l...

  9. Dare to Dialogue: Engaging Parents in System Change

    ERIC Educational Resources Information Center

    Graham, Patrick; Kennedy, Sara; Lynch, Johanna

    2016-01-01

    Determined parents are powerful advocates at all levels of our society. Parents can move mountains for their child, and they often do. State teams that actively collaborate with parents gain new perspectives, ideas, and energy. Statewide transition planning teams welcomed the authors--three parents who are also professionals active in the deaf…

  10. 78 FR 53187 - Early Scoping Notification for the Alternatives Analysis of the GA 400 Transit Initiative in...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-28

    ... (MARTA) issue this early scoping notice to advise other agencies and the public that they intend to... the public and agency officials to help support the ongoing alternatives analysis and system planning... considered, the transportation problems that are being addressed by the alternatives analysis study, public...

  11. Planning for airport access: An analysis of the San Francisco Bay area. Three subsystem designs

    NASA Technical Reports Server (NTRS)

    1978-01-01

    The outcomes of three analytical studies are presented. Areas of concentration presented include: (1) Zonal Airport Transit System designed to address the problem of airport access options, (2) the issues and problems of airport parking and circulation, and (3) the problems of effectively providing airport access information.

  12. Educational Financing and Budgeting in Tajikistan. Financial Management of Education Systems. Working Document.

    ERIC Educational Resources Information Center

    Davlatov, Ismail D.; Mulloev, Sharif M.

    This book provides an indepth description and analysis of financial management and budgetary procedures for education in Tajikistan. This country's case is exceptional even for the group of newly independent post-Soviet countries. In addition to the difficulties of the transition period similar for all former centrally planned economies…

  13. Comprehensive Truck Size and Weight (TS&W) Study. Phase 1-synthesis, working paper 9 : the effects of TS&W regulations on truck travel and mode share

    DOT National Transportation Integrated Search

    2012-04-01

    This report presents the Transit System Data Test Plan for the national evaluation of the Los Angeles Congestion Reduction Demonstration (Metro ExpressLanes) under the United States Department of Transportation (U.S. DOT) Congestion Reduction Demonst...

  14. Longitudinal Study of First-Time Freshmen Using Data Mining

    ERIC Educational Resources Information Center

    Nandeshwar, Ashutosh R.

    2010-01-01

    In the modern world, higher education is transitioning from enrollment mode to recruitment mode. This shift paved the way for institutional research and policy making from historical data perspective. More and more universities in the U.S. are implementing and using enterprise resource planning (ERP) systems, which collect vast amounts of data.…

  15. 47 CFR 301.120 - Reports on Agency Transition Plans.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 5 2013-10-01 2013-10-01 false Reports on Agency Transition Plans. 301.120 Section 301.120 Telecommunication NATIONAL TELECOMMUNICATIONS AND INFORMATION ADMINISTRATION, DEPARTMENT OF COMMERCE RELOCATION OF AND SPECTRUM SHARING BY FEDERAL GOVERNMENT STATIONS Technical Panel § 301...

  16. Policy evaluation for a bus-based transit system: the case study of Busan, Korea

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lew, K.S.

    This study considers a quite specific set of dimensions of transit evaluation as a comprehensive management-strategy approach for addressing the ongoing problems of urban public transit systems and apply them in a case study. With increasing difficulties in providing effective public transportation, attention in this study was placed on providing for the movement of people in an efficient and equitable manner. This study was therefore concerned with just identifying and evaluating policy options that are feasible within the socio-economic and political context of the Busan metropolitan area and, in particular, how the criteria of efficiency and equity can best bemore » achieved by implementing transit policy alternatives. In the absence of long-run major public investment in urban transportation, the criteria of both efficiency and equity can only be furthered through managerial strategies applied within a systematic evaluative framework. By emphasizing the planning, operational, and managerial considerations of fixed-route bus transit in Busan, it has been acknowledged that efficient and equitable public transportation can be provided through a variety of social, economic, political, and institutional arrangements that are possible to apply from a policy viewpoint in the immediate future.« less

  17. Climate mitigation is not the only benefit of a national energy system

    NASA Astrophysics Data System (ADS)

    Clack, C.

    2016-12-01

    Many speculate that the main driving force for a continental scale energy system is for climate mitigation. While this is a strong driver, there are multiple co-benefits that emerge from such a transition when purely driven by costs. These components could be managed within a planned system to provide a close-to-optimal solution that enhances the probability of realization. It is shown that these co-benefits of a continental scale electric system occur at costs lower than existing ones. That means there are multiple additional savings without extra costs or effort. The disadvantage is coordination between large geographic regions that could cause more complexity in planning. The main finding from different versions of the NEWS simulator is that carbon mitigation is enhanced by larger systems. In addition, there are increased jobs, reduced water consumption, Sulphur dioxide emissions, Nitrogen oxide emissions, a more distributed electric system and a lower cost of electricity.

  18. Transition in Gas Turbine Control System Architecture: Modular, Distributed, and Embedded

    NASA Technical Reports Server (NTRS)

    Culley, Dennis

    2010-01-01

    Controls systems are an increasingly important component of turbine-engine system technology. However, as engines become more capable, the control system itself becomes ever more constrained by the inherent environmental conditions of the engine; a relationship forced by the continued reliance on commercial electronics technology. A revolutionary change in the architecture of turbine-engine control systems will change this paradigm and result in fully distributed engine control systems. Initially, the revolution will begin with the physical decoupling of the control law processor from the hostile engine environment using a digital communications network and engine-mounted high temperature electronics requiring little or no thermal control. The vision for the evolution of distributed control capability from this initial implementation to fully distributed and embedded control is described in a roadmap and implementation plan. The development of this plan is the result of discussions with government and industry stakeholders

  19. Medicaid beneficiaries in california reported less positive experiences when assigned to a managed care plan.

    PubMed

    McDonnell, Diana D; Graham, Carrie L

    2015-03-01

    In 2011 California began transitioning approximately 340,000 seniors and people with disabilities from Medicaid fee-for-service (FFS) to Medicaid managed care plans. When beneficiaries did not actively choose a managed care plan, the state assigned them to one using an algorithm based on their previous FFS primary and specialty care use. When no clear link could be established, beneficiaries were assigned by default to a managed care plan based on weighted randomization. In this article we report the results of a telephone survey of 1,521 seniors and people with disabilities enrolled in Medi-Cal (California Medicaid) and who were recently transitioned to a managed care plan. We found that 48 percent chose their own plan, 11 percent were assigned to a plan by algorithm, and 41 percent were assigned to a plan by default. People in the latter two categories reported being similarly less positive about their experiences compared to beneficiaries who actively chose a plan. Many states in addition to California are implementing mandatory transitions of Medicaid-only beneficiaries to managed care plans. Our results highlight the importance of encouraging beneficiaries to actively choose their health plan; when beneficiaries do not choose, states should employ robust intelligent assignment algorithms. Project HOPE—The People-to-People Health Foundation, Inc.

  20. Maintenance and operations contractor plan for transition to the project Hanford management contract (PHMC)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Waite, J.L.

    1996-04-12

    This plan has been developed by Westinghouse Hanford Company (WHC), and its subcontractors ICF Kaiser Hanford (ICF KH) and BCS Richland, Inc. (BCSR), at the direction of the US Department of Energy (DOE), Richland Operations Office (RL). WHC and its subcontractors are hereafter referred to as the Maintenance and Operations (M and O) Contractor. The plan identifies actions involving the M and O Contractor that are critical to (1) prepare for a smooth transition to the Project Hanford Management Contractor (PHMC), and (2) support and assist the PHMC and RL in achieving transition as planned, with no or minimal impactmore » to ongoing baseline activities. The plan is structured around two primary phases. The first is the pre-award phase, which started in mid-February 1996 and is currently scheduled to be completed on June 1, 1996, at which time the contract is currently planned to be awarded. The second is the follow-on four-month post-award phase from June 1, 1996, until October 1, 1996. Considering the magnitude and complexity of the scope of work being transitioned, completion in four months will require significant effort by all parties. To better ensure success, the M and O Contractor has developed a pre-award phase that is intended to maximize readiness for transition. Priority is given to preparation for facility assessments and processing of personnel, as these areas are determined to be on the critical path for transition. In addition, the M and O Contractor will put emphasis during the pre-award phase to close out open items prior to contract award, to include grievances, employee concerns, audit findings, compliance issues, etc.« less

  1. Integrating an EMR-based Transition Planning Tool for CYSHCN at a Children's Hospital: A Quality Improvement Project to Increase Provider Use and Satisfaction

    PubMed Central

    Wiemann, Constance M.; Hergenroeder, Albert C.; Bartley, Krystle A.; Sanchez-Fournier, Blanca; Hilliard, Marisa E.; Warren, Laura J.; Graham, Sarah C.

    2016-01-01

    An electronic medical record (EMR)-based transition planning tool (TPT) designed to facilitate transition from pediatric to adult-based health care for youth (16–25 years) with special health care needs was introduced at a large children's hospital. Activities to increase provider use were implemented in five plan–do–study–act cycles. Overall, 22 of 25 (88%) consenting providers in four pediatric subspecialty services used the TPT during 303 patient encounters, with nurses and case-managers the top users and physicians the least likely users. Use was highest with intensive technical assistance and following the introduction of an upgraded tool. Provider satisfaction with the TPT and self-reported transition planning activities notably increased across the PDSA cycles. PMID:26209173

  2. 5 CFR 330.607 - Notification of surplus and displaced employees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATIONS RECRUITMENT, SELECTION, AND PLACEMENT (GENERAL) Agency Career Transition Assistance Plans (CTAP... available to them under the agency's Career Transition Assistance Plan. Such information must contain... notice must include information on the results of an independent, second review conducted by the agency...

  3. Nervous systems and scenarios for the invertebrate-to-vertebrate transition

    PubMed Central

    Holland, Nicholas D.

    2016-01-01

    Older evolutionary scenarios for the origin of vertebrates often gave nervous systems top billing in accordance with the notion that a big-brained Homo sapiens crowned a tree of life shaped mainly by progressive evolution. Now, however, tree thinking positions all extant organisms equidistant from the tree's root, and molecular phylogenies indicate that regressive evolution is more common than previously suspected. Even so, contemporary theories of vertebrate origin still focus on the nervous system because of its functional importance, its richness in characters for comparative biology, and its central position in the two currently prominent scenarios for the invertebrate-to-vertebrate transition, which grew out of the markedly neurocentric annelid and enteropneust theories of the nineteenth century. Both these scenarios compare phyla with diverse overall body plans. This diversity, exacerbated by the scarcity of relevant fossil data, makes it challenging to establish plausible homologies between component parts (e.g. nervous system regions). In addition, our current understanding of the relation between genotype and phenotype is too preliminary to permit us to convert gene network data into structural features in any simple way. These issues are discussed here with special reference to the evolution of nervous systems during proposed transitions from invertebrates to vertebrates. PMID:26598728

  4. SU-F-J-114: On-Treatment Imagereconstruction Using Transit Images of Treatment Beams Through Patient and Thosethrough Planning CT Images

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, H; Cho, S; Cheong, K

    Purpose: To reconstruct patient images at the time of radiation delivery using measured transit images of treatment beams through patient and calculated transit images through planning CT images. Methods: We hypothesize that the ratio of the measured transit images to the calculated images may provide changed amounts of the patient image between times of planning CT and treatment. To test, we have devised lung phantoms with a tumor object (3-cm diameter) placed at iso-center (simulating planning CT) and off-center by 1 cm (simulating treatment). CT images of the two phantoms were acquired; the image of the off-centered phantom, unavailable clinically,more » represents the reference on-treatment image in the image quality of planning CT. Cine-transit images through the two phantoms were also acquired in EPID from a non-modulated 6 MV beam when the gantry was rotated 360 degrees; the image through the centered phantom simulates calculated image. While the current study is a feasibility study, in reality our computational EPID model can be applicable in providing accurate transit image from MC simulation. Changed MV HU values were reconstructed from the ratio between two EPID projection data, converted to KV HU values, and added to the planning CT, thereby reconstructing the on-treatment image of the patient limited to the irradiated region of the phantom. Results: The reconstructed image was compared with the reference image. Except for local HU differences>200 as a maximum, excellent agreement was found. The average difference across the entire image was 16.2 HU. Conclusion: We have demonstrated the feasibility of a method of reconstructing on-treatment images of a patient using EPID image and planning CT images. Further studies will include resolving the local HU differences and investigation on the dosimetry impact of the reconstructed image.« less

  5. Homogeneous Studies of Transiting Extrasolar Planets: Current Status and Future Plans

    NASA Astrophysics Data System (ADS)

    Taylor, John

    2011-09-01

    We now know of over 500 planets orbiting stars other than our Sun. The jewels in the crown are the transiting planets, for these are the only ones whose masses and radii are measurable. They are fundamental for our understanding of the formation, evolution, structure and atmospheric properties of extrasolar planets. However, their characterization is not straightforward, requiring extremely high-precision photometry and spectroscopy as well as input from theoretical stellar models. I summarize the motivation and current status of a project to measure the physical properties of all known transiting planetary systems using homogeneous techniques (Southworth 2008, 2009, 2010, 2011 in preparation). Careful attention is paid to the treatment of limb darkening, contaminating light, correlated noise, numerical integration, orbital eccentricity and orientation, systematic errors from theoretical stellar models, and empirical constraints. Complete error budgets are calculated for each system and can be used to determine which type of observation would be most useful for improving the parameter measurements. Known correlations between the orbital periods, masses, surface gravities, and equilibrium temperatures of transiting planets can be explored more safely due to the homogeneity of the properties. I give a sneak preview of Homogeneous Studies Paper 4, which includes the properties of thirty transiting planetary systems observed by the CoRoT, Kepler and Deep Impact space missions. Future opportunities are discussed, plus remaining problems with our understanding of transiting planets. I acknowledge funding from the UK STFC in the form of an Advanced Fellowship.

  6. Estimating the effects of light rail transit on health care costs.

    PubMed

    Stokes, Robert J; MacDonald, John; Ridgeway, Greg

    2008-03-01

    In recent years, there has been a proliferation of research on the effects of the built environment, including mass transit systems, on health-related outcomes. While there is general agreement that the built environment affects travel choices and physical activity, it remains unclear how much of a public health benefit (in dollars) can be derived from land use policies that support walking, biking, and transit. In the present study, we develop a model to assess the potential cost savings in public health that will be realized from the investment in a new light rail transit system in Charlotte, NC. Relying on estimates of future riders, area obesity rates, and the effects of public transit on physical activity (daily walking to and from the transit stations), we simulated the potential yearly public health cost savings associated with this infrastructure investment. Our results indicate that investing in light rail is associated with a 9-year cumulative public health cost savings of dollars 12.6 million. While these results suggest that there is a sizable public health benefit associated with the adoption of light rail, they also indicate that the effects are relatively small compared to the costs associated with constructing and operating such systems. These findings suggest that planning efforts that focus solely on the health impact of modifications in the built environment are likely to overstate the economic benefits. Public health benefits should be considered along with broader environmental health benefits.

  7. Edge profile measurements using Thomson scattering on the KSTAR tokamak

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lee, J. H., E-mail: jhleel@nfri.re.kr; Ko, W. H.; Department of Nuclear Fusion and Plasma Science, University of Science and Technology

    2014-11-15

    In the KSTAR Tokamak, a “Tangential Thomson Scattering” (TTS) diagnostic system has been designed and installed to measure electron density and temperature profiles. In the edge system, TTS has 12 optical fiber bundles to measure the edge profiles with 10–15 mm spatial resolution. These 12 optical fibers and their spatial resolution are not enough to measure the pedestal width with a high accuracy but allow observations of L-H transition or H-L transitions at the edge. For these measurements, the prototype ITER edge Thomson Nd:YAG laser system manufactured by JAEA in Japan is installed. In this paper, the KSTAR TTS systemmore » is briefly described and some TTS edge profiles are presented and compared against the KSTAR Charge Exchange Spectroscopy and other diagnostics. The future upgrade plan of the system is also discussed in this paper.« less

  8. A Strategic Plan for Integrating ICD-10 in Your Practice and Workflow.

    PubMed

    Bowman, Sue; Cleland, Risë Marie; Staggs, Stuart

    2015-01-01

    The adoption of the International Classification of Disease (ICD) 10th Revision (ICD-10) diagnosis code set in the United States has been legislatively delayed several times with the most recent date for implementation set for October 1, 2015. The transition from ICD-9 to ICD-10 will be a major undertaking that will require a substantial amount of planning. In the following article, we outline the steps to develop and implement a strategic plan for the transition to the new code set, identify training needs throughout the practice, and review the challenges and opportunities associated with the transition to ICD-10.

  9. Guidelines for Transitional Education Plan Preparation

    ERIC Educational Resources Information Center

    Lattanzio, Raphaëlle Martinez; Bethke, Lynne; Haas, Anna; Perrier, Janne Kjaersgaard; De Grauwe, Anton; Sigsgaard, Morten; Bird, Lyndsay; Coury, Diane; Gay, Dorian; MacEwan, Leonora; Seeger, Anna

    2016-01-01

    The "Guidelines for the Transitional Education Plan Preparation" are the result of an extensive consultation process and the product of fruitful guidance and contributions from key partners active in the field of education in emergencies and protracted crises. The new global education agenda 2030 places strong emphasis on countries…

  10. Characteristics of Transition Planning and Services for Students with High-Incidence Disabilities

    ERIC Educational Resources Information Center

    Trainor, Audrey A.; Morningstar, Mary E.; Murray, Angela

    2016-01-01

    Transition planning is conceptually and empirically linked to successful postschool outcomes for adolescents with disabilities and has been legally mandated for more than two decades. Unfortunately, young adults with high-incidence disabilities, including learning disabilities (LD), emotional disabilities (ED), and attention-deficit/hyperactivity…

  11. Liquid rocket booster study. Volume 2, book 3, appendices 2-5: PPIP, transition plan, AMOS plan, and environmental analysis

    NASA Technical Reports Server (NTRS)

    1988-01-01

    This Preliminary Project Implementation Plan (PPIP) was used to examine the feasibility of replacing the current Solid Rocket Boosters on the Space Shuttle with Liquid Rocket Boosters (LRBs). The need has determined the implications of integrating the LRB with the Space Transportation System as the earliest practical date. The purpose was to identify and define all elements required in a full scale development program for the LRB. This will be a reference guide for management of the LRB program, addressing such requirement as design and development, configuration management, performance measurement, manufacturing, product assurance and verification, launch operations, and mission operations support.

  12. Transit-oriented development (TOD) in metro Detroit.

    DOT National Transportation Integrated Search

    2014-03-01

    The term transit-oriented development (TOD) is being used increasingly in transit literature, particularly in studies related to : planning and design of urban rail transit. TOD relates to the integration of diverse (but desirable) land uses with tra...

  13. Transit Project Planning Guidance : Estimation of Transit Supply Parameters

    DOT National Transportation Integrated Search

    1984-04-01

    This report discusses techniques applicable to the estimation of transit vehicle fleet requirements, vehicle-hours and vehicle-miles, and other related transit supply parameters. These parameters are used for estimating operating costs and certain ca...

  14. Successful reentry: the perspective of private correctional health care providers.

    PubMed

    Mellow, Jeff; Greifinger, Robert B

    2007-01-01

    Due to public health and safety concerns, discharge planning is increasingly prioritized by correctional systems when preparing prisoners for their reintegration into the community. Annually, private correctional health care vendors provide $3 billion of health care services to inmates in correctional facilities throughout the U.S., but rarely are contracted to provide transitional health care. A discussion with 12 people representing five private nationwide correctional health care providers highlighted the barriers they face when implementing transitional health care and what templates of services health care companies could provide to state and counties to enhance the reentry process.

  15. Making change easy: A peer-to-peer guide on transitioning to new hand hygiene products.

    PubMed

    Amirov, Chingiz M; Candon, Heather L; Jacob, Latha

    2017-01-01

    This report summarizes our experiences planning and implementing the transition to a new commercial line of hand hygiene products and their dispensing systems in a large academic health care facility in Toronto, Canada. Our lessons learned are organized into a practical guide made available in 2 different formats: this article and an illustrated peer-to-peer guide (http://www.baycrest.org/wp-content/uploads/HCE-PROG-HH_HighQuality.pdf). Copyright © 2017 Association for Professionals in Infection Control and Epidemiology, Inc. Published by Elsevier Inc. All rights reserved.

  16. No Magic Bullet: A Theory-Based Meta-Analysis of Markov Transition Probabilities in Studies of Service Systems for Persons With Mental Disabilities.

    PubMed

    Leff, Hugh Stephen; Chow, Clifton M; Graves, Stephen C

    2017-03-01

    A random-effects meta-analysis of studies that used Markov transition probabilities (TPs) to describe outcomes for mental health service systems of differing quality for persons with serious mental illness was implemented to improve the scientific understanding of systems performance, to use in planning simulations to project service system costs and outcomes over time, and to test a theory of how outcomes for systems varying in quality differ. Nineteen systems described in 12 studies were coded as basic (B), maintenance (M), and recovery oriented (R) on the basis of descriptions of services provided. TPs for studies were aligned with a common functional-level framework, converted to a one-month time period, synthesized, and compared with theory-based expectations. Meta-regression was employed to explore associations between TPs and characteristics of service recipients and studies. R systems performed better than M and B systems. However, M systems did not perform better than B systems. All systems showed negative as well as positive TPs. For approximately one-third of synthesized TPs, substantial interstudy heterogeneity was noted. Associations were found between TPs and service recipient and study variables Conclusions: Conceptualizing systems as B, M, and R has potential for improving scientific understanding and systems planning. R systems appear more effective than B and M systems, although there is no "magic bullet" system for all service recipients. Interstudy heterogeneity indicates need for common approaches to reporting service recipient states, time periods for TPs, service recipient attributes, and service system characteristics. TPs found should be used in Markov simulations to project system effectiveness and costs of over time.

  17. 1981 census of India: some implications for family planning.

    PubMed

    Ramabhadran, V K

    1983-01-01

    India's 1981 census disclosed a population of 684 million with an addition of 136 million during the 1971-81 decade and a decadal growth rate of 24.75% or 2.21% annually, showing little change from the previous decade. An important feature brought out by the 1981 census is that the problem of rapid population growth in India is essentially a regional problem. The growth rates among the 15 major States (those with a population in excess of 10 million) has varied from 17.23 in Tamil Nadu to 32.36 in Rajasthan. In 7 States the growth rate has increased creating a higher momentum to population growth. The implications of the 1981 census for policy action are both at the national level and at the State level. In States where the growth rate has dropped the prime explanation is generally fertility. The 1981 census growth rate brings into focus the different combinations of birth and death rates in different States indicating different phases of demographic transition. At the national level, set against the goal of net reproductive rate (NRR) = 1 (implying a birthrate of 21 and a death rate of 9.2), the trend in the birthrate during the 2nd quinquennium of the 1970s is to plateau around 33/1000. The drop in the birthrate from 40+ to 33/1000 has been brought about through a family planning program largely based on sterilization and accepted by high parity and older couples. During the past few years the contraception level has been plateauing at 23%. If a further and continuous decline in fertility is to be realized, the family planning program needs a redirection towards younger couples with increased emphasis on spacing methods while maintaining the targeted levels of sterilization. This requires a change in strategy. As has been demonstrated in countries in Asia and Latin America, spacing methods are particularly suited to a community based delivery system with the government ensuring adequate and continuous supply of contraceptives. The 2nd stage of fertility decline in India requires that family planning during the 1981-91 decade should be made consistent with the needs and economic well-being of the people. Development must be increasingly population oriented. To indicate what type of developmental activity is to be assigned priority in conjunction with the family planning program, the 15 major States are classified on a demographic transition scale, based on the vital rates for 1980. Class E States in the early stage of transition require a strengthening of family planning and health programs. States in the middle level of transition require that their family planning programs focus on quality and outreach in rural areas. A progressive record of socioeconomic development along with family planning is required in states poised for completion of their demographic transition.

  18. Appalachian Regional Commission: 1982 Annual Report.

    ERIC Educational Resources Information Center

    Appalachian Regional Commission, Washington, DC.

    Fiscal year 1982 was transitional for the Appalachian Regional Commission (ARC), as it was the last year of the broad economic development program and a year of reduced funding and new limits on programs. In 1981, Congress had requested that ARC prepare a plan for completion of the Appalachian highway system and for a 3 to 5 year ARC finish-up…

  19. Are Resources Important? (Testimony of Eric Alan Hanushek, March 11, 1996).

    ERIC Educational Resources Information Center

    Hanushek, Eric Alan

    1997-01-01

    E. A. Hanushek analyzed the possibility that the St. Louis (Missouri) school district could operate a quality school system with the resources it would get under the state's transition plan that would phase out state financial support for school desegregation. The witness projected no adverse effect on the quality of education in the city. (SLD)

  20. Integrated Thermal Response Modeling System For Hypersonic Entry Vehicles

    NASA Technical Reports Server (NTRS)

    Chen, Y.-K.; Milos, F. S.; Partridge, Harry (Technical Monitor)

    2000-01-01

    We describe all extension of the Markov decision process model in which a continuous time dimension is included ill the state space. This allows for the representation and exact solution of a wide range of problems in which transitions or rewards vary over time. We examine problems based on route planning with public transportation and telescope observation scheduling.

  1. LOWER COLUMBIA RIVER ESTUARY PROGRAM COMPREHENSIVE CONSERVATION AND MANAGEMENT PLAN

    EPA Science Inventory

    An estuary is the area where the fresh water of a river meets the salt water of an ocean. In the Columbia River system, this occurs in the lower 46 river miles. In an estuary, the river has a direct, natural connection with the open sea. This transition from fresh to salt water c...

  2. The Construction and Practice of Classified Talent Cultivation System Combining with Professional Certification

    ERIC Educational Resources Information Center

    Jianwei, Yang; Aihua, Zhu; Yuanyuan, Zhang; Chunqing, Zhao

    2016-01-01

    According to the idea of CDIO engineering education, this paper, combing with professional certification, makes training plan of Urban Rail Transit Vehicles Engineering direction in our school on the basis of research on universities at home and abroad. It strengthens the teaching of basic subjects and increases the weeks of practice link in the…

  3. Examining Middle School Students' Awareness of Their Career Paths

    ERIC Educational Resources Information Center

    Alsuwaidi, Sultan A.

    2012-01-01

    The United Arab Emirates (UAE) education system is missing an educational plan that can provide students the necessary information to learn about themselves and the world of work and help them make a smooth transition from primary school to secondary schools and the workplace. To address this gap, this study examined 9th graders' career awareness…

  4. Analysis and Reporting Needs for Annual Forest Inventories in the South

    Treesearch

    Michael T. Thompson

    2001-01-01

    The annual forest inventory system essentially eliminates the concept of the periodic inventory. Therefore, the reporting requirements and needs for individual States will change as the South makes the transition to full annual inventories. The Farm Bill and the Forest Service Strategic Plan require both annual reports and 5-year comprehensive, analytical reports. The...

  5. Transition Plan For Moving AFOMS Occupational Analysis Report Contents to AFPC’s Human Resources Research Database

    DTIC Science & Technology

    2008-09-20

    improving formal course content (Metrica, 2000; Teachout, Sego & Ford, 1995; Teachout, Sego, & Olea , 1993). The conceptual foundation of TEEM is that in...System (TIDES) User’s Manual , Version 3.3. San Antonio TX: Metrica, Inc. Teachout, M.S., Sego, D.J., & Olea , M.M. (1993). Assessing training

  6. Path planning during combustion mode switch

    DOEpatents

    Jiang, Li; Ravi, Nikhil

    2015-12-29

    Systems and methods are provided for transitioning between a first combustion mode and a second combustion mode in an internal combustion engine. A current operating point of the engine is identified and a target operating point for the internal combustion engine in the second combustion mode is also determined. A predefined optimized transition operating point is selected from memory. While operating in the first combustion mode, one or more engine actuator settings are adjusted to cause the operating point of the internal combustion engine to approach the selected optimized transition operating point. When the engine is operating at the selected optimized transition operating point, the combustion mode is switched from the first combustion mode to the second combustion mode. While operating in the second combustion mode, one or more engine actuator settings are adjusted to cause the operating point of the internal combustion to approach the target operating point.

  7. VizieR Online Data Catalog: Transits of HAT-P-16 and WASP-21 (Ciceri+, 2013)

    NASA Astrophysics Data System (ADS)

    Ciceri, S.; Mancini, L.; Southworth, J.; Nikolov, N.; Bozza, V.; Bruni, I.; Calchi Novati, S.; D'Ago, G.; Henning, T.

    2013-07-01

    For both planetary systems, we observed one transit event simultaneously with two telescopes (Figs. 1 and 2). These observations were carried out between September and October 2012 with the 1.52m Cassini telescope from the Loiano observatory and with the 1.23m Calar Alto telescope. An additional transit of HAT-P-16 was observed on October 29th 2010 from Loiano during the PLAN microlensing campaign towards M31 (Calchi Novati et al. 2009ApJ...695..442N, 2010ApJ...717..987C). Another transit of HAT-P-16 was observed in Calar Alto on August 22th 2011. In total we present six new light curves, five of them being from defocussed 1.2-1.5m telescopes (see table 1). File contain the data used to plot the lightcurves in Fig. 3 and 4 in the paper. (7 data files).

  8. Emotional Behavior Disorders: The Lost Population of Special Education

    ERIC Educational Resources Information Center

    Bounds, Quintella

    2012-01-01

    The primary purpose of this study was to determine if there is a significant difference in postsecondary completion rates between students with Emotional Behavior Disorder (EBD) who were involved with their own postsecondary transition planning processes, whose parents were involved in the transition planning, and who received services or…

  9. Transition-Marking Behaviors of Adolescent Males at First Intercourse.

    ERIC Educational Resources Information Center

    McLean, Ann L.; Flanigan, Beverly J.

    1993-01-01

    Examined male transition-marking behaviors from adolescence into adulthood at first intercourse. Findings from 80 adolescent males revealed that alcohol use at first intercourse was unrelated to use of contraceptives at that time but was inversely related to whether first intercourse was planned. Planning was positively related to contraceptive…

  10. Planning the Transition to End-of-Life Care in Advanced Cancer (PDQ®)—Health Professional Version

    Cancer.gov

    Planning the transition to end-of-life care in advanced cancer involves making decisions that can be challenging and emotionally distressing. Get information about likely topics and strategies to improve patient-oncologist communication and decision making in this clinician summary.

  11. Planning Guide for Implementing a Quality Youth Apprenticeship Program in Georgia.

    ERIC Educational Resources Information Center

    Smith, Clifton L.

    This planning guide begins with an overview of school-to-work transition. Section 1 also provides an overview of federal and Georgia state legislation and describes current school-to-work transition efforts, such as tech prep education, youth apprenticeship, cooperative education, entrepreneurial ventures and school-based enterprises,…

  12. Predictors of Suicidal Ideation in a Statewide Sample of Transgender Individuals.

    PubMed

    Rood, Brian A; Puckett, Julia A; Pantalone, David W; Bradford, Judith B

    2015-09-01

    Transgender individuals experience violence and discrimination, which, in addition to gender transitioning, are established correlates of psychological distress. In a statewide sample of 350 transgender adults, we investigated whether a history of violence and discrimination increased the odds of reporting lifetime suicidal ideation (SI) and whether differences in SI were predicted by gender transition status. Violence, discrimination, and transition status significantly predicted SI. Compared with individuals with no plans to transition, individuals with plans or who were living as their identified gender reported greater odds of lifetime SI. We discuss implications for SI disparities using Meyer's minority stress model.

  13. MASS TRANSIT: FTA Could Relieve New Starts Program Funding Constraints

    DTIC Science & Technology

    2001-08-01

    progress through a local or regional review of alternatives, develop preliminary engineering plans , and obtain FTA’s approval for final design.7 TEA-21...and transit programs can also be used to develop, plan , and/or construct these projects. 7The alternatives analysis stage provides information on the...include right-of-way acquisition, utility relocation, and the preparation of final construction plans and cost estimates. Background Page 5 GAO-01-987 New

  14. Management practices to support donor transition: lessons from Avahan, the India AIDS Initiative.

    PubMed

    Bennett, Sara; Rodriguez, Daniela; Ozawa, Sachiko; Singh, Kriti; Bohren, Meghan; Chhabra, Vibha; Singh, Suneeta

    2015-06-13

    During 2009-2012, Avahan, a large donor funded HIV/AIDS prevention program in India was transferred from donor support and operation to government. This transition of approximately 200 targeted interventions (TIs), occurred in three tranches in 2009, 2011 and 2012. This paper reports on the management practices pursued in support of a smooth transition of the program, and addresses the extent to which standard change management practices were employed, and were useful in supporting transition. We conducted structured surveys of a sample of 80 TIs from the 2011 and 2012 rounds of transition. One survey was administered directly before transition and the second survey 12 month after transition. These surveys assessed readiness for transition and practices post-transition. We also conducted 15 case studies of transitioning TIs from all three rounds, and re-visited 4 of these 1-3 years later. Considerable evolution in the nature of relationships between key actors was observed between transition rounds, moving from considerable mistrust and lack of collaboration in 2009 toward a shared vision of transition and mutually respectful relationships between Avahan and government in later transition rounds. Management practices also evolved with the gradual development of clear implementation plans, establishment of the post of "transition manager" at state and national levels, identified budgets to support transition, and a common minimum programme for transition. Staff engagement was important, and was carried out relatively effectively in later rounds. While the change management literature suggests short-term wins are important, this did not appear to be the case for Avahan, instead a difficult first round of transition seemed to signal the seriousness of intentions regarding transition. In the Avahan case a number of management practices supported a smooth transition these included: an extended and sequenced time frame for transition; co-ownership and planning of transition by both donor and government; detailed transition planning and close attention to program alignment, capacity development and communication; engagement of staff in the transition process; engagement of multiple stakeholders post transition to promote program accountability and provide financial support; signaling by actors in charge of transition that they were committed to specified time frames.

  15. Modeling demand for public transit services in rural areas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Attaluri, P.; Seneviratne, P.N.; Javid, M.

    1997-05-01

    Accurate estimates of demand are critical for planning, designing, and operating public transit systems. Previous research has demonstrated that the expected demand in rural areas is a function of both demographic and transit system variables. Numerous models have been proposed to describe the relationship between the aforementioned variables. However, most of them are site specific and their validity over time and space is not reported or perhaps has not been tested. Moreover, input variables in some cases are extremely difficult to quantify. In this article, the estimation of demand using the generalized linear modeling technique is discussed. Two separate models,more » one for fixed-route and another for demand-responsive services, are presented. These models, calibrated with data from systems in nine different states, are used to demonstrate the appropriateness and validity of generalized linear models compared to the regression models. They explain over 70% of the variation in expected demand for fixed-route services and 60% of the variation in expected demand for demand-responsive services. It was found that the models are spatially transferable and that data for calibration are easily obtainable.« less

  16. The Health Care Transition of Youth With Liver Disease Into the Adult Health System: Position Paper From ESPGHAN and EASL.

    PubMed

    Vajro, Pietro; Fischler, Björn; Burra, Patrizia; Debray, Dominique; Dezsofi, Antal; Guercio Nuzio, Salvatore; Hadzic, Nedim; Hierro, Loreto; Jahnel, Joerg; Lamireau, Thierry; McKiernan, Patrick; McLin, Valerie; Nobili, Valerio; Socha, Piotr; Smets, Francoise; Baumann, Ulli; Verkade, Henkjan J

    2018-06-01

    Medical advances have dramatically improved the long-term prognosis of children and adolescents with once-fatal hepatobiliary diseases. However, there is no generally accepted optimal pathway of care for the transition from paediatric care to the adult health system. The purpose of this position paper is to propose a transition process for young people with paediatric onset hepatobiliary diseases from child-centred to adult-centred healthcare services. Seventeen ESPGHAN/EASL physicians from 13 countries (Austria, Belgium, France, Germany, Hungary, Italy, the Netherlands, Norway, Poland, Spain, Sweden, Switzerland, and United Kingdom) formulated and answered questions after examining the currently published literature on transition from childhood to adulthood. PubMed and Google Scholar were systematically searched between 1980 and January 2018. Quality of evidence was assessed by the Grading of Recommendation Assessment, Development and Evaluation (GRADE) system. Expert opinions were used to support recommendations whenever the evidence was graded weak. All authors voted on each recommendation, using the nominal voting technique. We reviewed the literature regarding the optimal timing for the initiation of the transition process and the transfer of the patient to adult services, principal documents, transition multi-professional team components, main barriers, and goals of the general transition process. A transition plan based on available evidence was agreed focusing on the individual young people's readiness and on coordinated teamwork, with transition monitoring continuing until the first year of adult services.We further agreed on selected features of transitioning processes inherent to the most frequent paediatric-onset hepatobiliary diseases. The discussion highlights specific clinical issues that will probably present to adult gastrointestinal specialists and that should be considered, according to published evidence, in the long-term tracking of patients. Transfer of medical care of individuals with paediatric onset hepatobiliary chronic diseases to adult facilities is a complex task requiring multiple involvements of patients and both paediatric and adult care providers.

  17. The role of primary health care services to better meet the needs of Aboriginal Australians transitioning from prison to the community.

    PubMed

    Lloyd, Jane E; Delaney-Thiele, Dea; Abbott, Penny; Baldry, Eileen; McEntyre, Elizabeth; Reath, Jennifer; Indig, Devon; Sherwood, Juanita; Harris, Mark F

    2015-07-22

    Aboriginal Australians are more likely than other Australians to cycle in and out of prison on remand or by serving multiple short sentences-a form of serial incarceration and institutionalisation. This cycle contributes to the over-representation of Aboriginal Australians in prison and higher rates of recidivism. Our research examined how primary health care can better meet the health care and social support needs of Aboriginal Australians transitioning from prison to the community. Purposive sampling was used to identify 30 interviewees. Twelve interviews were with Aboriginal people who had been in prison; ten were with family members and eight with community service providers who worked with former inmates. Thematic analysis was conducted on the interviewees' description of their experience of services provided to prisoners both during incarceration and on transition to the community. Interviewees believed that effective access to primary health care on release and during transition was positively influenced by providing appropriate healthcare to inmates in custody and by properly planning for their release. Further, interviewees felt that poor communication between health care providers in custody and in the community prior to an inmate's release, contributed to a lack of comprehensive management of chronic conditions. System level barriers to timely communication between in-custody and community providers included inmates being placed on remand which contributed to uncertainty regarding release dates and therefore difficulties planning for release, cycling in and out of prison on short sentences and being released to freedom without access to support services. For Aboriginal former inmates and family members, release from prison was a period of significant emotional stress and commonly involved managing complex needs. To support their transition into the community, Aboriginal former inmates would benefit from immediate access to culturally- responsive community -primary health care services. At present, however, pre-release planning is not always available, especially for Aboriginal inmates who are more likely to be on remand or in custody for less than six months.

  18. PEPFAR Transitions to Country Ownership: Review of Past Donor Transitions and Application of Lessons Learned to the Eastern Caribbean.

    PubMed

    Vogus, Abigail; Graff, Kylie

    2015-06-17

    The US President's Emergency Plan for AIDS Relief (PEPFAR) has shifted from an emergency response to a sustainable, country-owned response. The process of transition to country ownership is already underway in the Eastern Caribbean; the Office of the US Global AIDS Coordinator (OGAC) has advised the region that PEPFAR funding is being redirected away from the Eastern Caribbean toward Caribbean countries with high disease burden to strengthen services for key populations. This article seeks to highlight and apply lessons learned from other donor transitions to support a successful transition of HIV programs in the Eastern Caribbean. Based on a rapid review of both peer-reviewed and gray literature on donor transitions to country ownership in family planning, HIV, and other areas, we identified 48 resources that addressed key steps in the transition process and determinants of readiness for transition. Analysis of the existing literature revealed 6 steps that could help ensure successful transition, including developing a clear roadmap articulated through high-level diplomacy; investing in extensive stakeholder engagement; and supporting monitoring and evaluation during and after the transition to adjust course as needed. Nine specific areas to assess a country's readiness for transition include: leadership and management capacity, political and economic factors, the policy environment, identification of alternative funding sources, integration of HIV programs into the wider health system, the institutionalization of processes, the strength of procurement and supply chain management, identification of staffing and training needs, and engagement of civil society and the private sector. In the Caribbean, key areas requiring strengthening to ensure countries in the region can maintain the gains made under PEPFAR include further engaging civil society and the private sector, building the capacity of NGOs to take on essential program functions, and maintaining donor support for targeted capacity building and long-term monitoring and evaluation efforts. © Vogus et al. This is an open-access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are properly cited. To view a copy of the license, visit http://creativecommons.org/licenses/by/3.0/

  19. Impacts of Groundwater Constraints on Saudi Arabia's Low-Carbon Electricity Supply Strategy.

    PubMed

    Parkinson, Simon C; Djilali, Ned; Krey, Volker; Fricko, Oliver; Johnson, Nils; Khan, Zarrar; Sedraoui, Khaled; Almasoud, Abdulrahman H

    2016-02-16

    Balancing groundwater depletion, socioeconomic development and food security in Saudi Arabia will require policy that promotes expansion of unconventional freshwater supply options, such as wastewater recycling and desalination. As these processes consume more electricity than conventional freshwater supply technologies, Saudi Arabia's electricity system is vulnerable to groundwater conservation policy. This paper examines strategies for adapting to long-term groundwater constraints in Saudi Arabia's freshwater and electricity supply sectors with an integrated modeling framework. The approach combines electricity and freshwater supply planning models across provinces to provide an improved representation of coupled infrastructure systems. The tool is applied to study the interaction between policy aimed at a complete phase-out of nonrenewable groundwater extraction and concurrent policy aimed at achieving deep reductions in electricity sector carbon emissions. We find that transitioning away from nonrenewable groundwater use by the year 2050 could increase electricity demand by more than 40% relative to 2010 conditions, and require investments similar to strategies aimed at transitioning away from fossil fuels in the electricity sector. Higher electricity demands under groundwater constraints reduce flexibility of supply side options in the electricity sector to limit carbon emissions, making it more expensive to fulfill climate sustainability objectives. The results of this analysis underscore the importance of integrated long-term planning approaches for Saudi Arabia's electricity and freshwater supply systems.

  20. Applications of connected vehicle infrastructure technologies to enhance transit service efficiency and safety.

    DOT National Transportation Integrated Search

    2016-09-30

    Many transit agencies provide real-time operational information and trip-planning tools through phone, Web, and smartphone applications. These services utilize a one-way information flow from transit agencies to transit users. Current smartphone tech...

Top