Sample records for transport facility task

  1. Transportation informatics : an image analysis system for managing transportation facilities - phase II.

    DOT National Transportation Integrated Search

    2012-02-01

    One of the most important tasks in maintaining transportation facilities such as highways : and streets is the evaluation of the existing condition. Visual evaluation by human : inspectors is subjective in nature, therefore has issues of consistency ...

  2. Determining the maintenance superintendent and facility needs for residencies in the Virginia Department of Transportation.

    DOT National Transportation Integrated Search

    2010-06-01

    In the spring of 2007, the Virginia Department of Transportation (VDOT) began the process of reducing the number of superintendents and facilities dedicated to ordinary maintenance tasks. The need to downsize was the direct result of the requirement ...

  3. FRA/Volpe Center task force observation of operations at TVE Transrapid test facility : October 15 to December 17, 1992

    DOT National Transportation Integrated Search

    1993-04-01

    This report prepared in April 1993 describes the operations witnessed and the relevant information obtained by nine members of the FRA/Volpe Center High Speed Guided Ground Transportation Safety Task Force during 9 weeks of observation of maglev deve...

  4. Freight Mobility Issues and Recommendation for the 1997 Baltimore Regional Transportation Plan: Report of the Transportation Steering Committee's Freight Movement Task Force

    DOT National Transportation Integrated Search

    1997-09-01

    This report provides an overview of the freight movement system within the Baltimore region, with an emphasis on intermodal facilities, identifies key long-range issues, and proposes investments and actions for inclusion in the 1997 Baltimore Regiona...

  5. Concept synthesis of an equipment manipulation and transportation system EMATS

    NASA Technical Reports Server (NTRS)

    Depeuter, W.; Waffenschmidt, E.

    1989-01-01

    The European Columbus Scenario is established. One of the Columbus Elements, the Man Tended Free Flyer will be designed for fully autonomous operation in order to provide the environment for micro gravity facilities. The Concept of an autonomous automation system which perform servicing of facilities and deals with related logistic tasks is discussed.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jeffrey Wishart

    This document reports the work performed under Task 1.2.1.1: 'The development of a charge protocol to take advantage of off- and on-peak demand economics at facilities'. The work involved in this task included understanding the experimental results of the other tasks of SOW-5799 in order to take advantage of the economics of electricity pricing differences between on- and off-peak hours and the demonstrated charging and facility energy demand profiles. To undertake this task and to demonstrate the feasibility of plug-in hybrid electric vehicle (PHEV) and electric vehicle (EV) bi-directional electricity exchange potential, BEA has subcontracted Electric Transportation Applications (now knownmore » as ECOtality North America and hereafter ECOtality NA) to use the data from the demand and energy study to focus on reducing the electrical power demand of the charging facility. The use of delayed charging as well as vehicle-to-grid (V2G) and vehicle-to-building (V2B) operations were to be considered.« less

  7. Nebraska Prostate Cancer Research Program

    DTIC Science & Technology

    2011-05-01

    is a multifunctional transmembrane receptor. The major function is to transport lysosome enzymes from where they are processed in the Golgi apparatus ...potential improvement for new students in the summer of 2011. Task 5: Announcement of the Year 2 Research Program (months 13-15) Done. Per...various research facilities and biotech companies. Currently, we are waiting for the arrival of the new students. Task 7: Summer Research (month 19

  8. Tennessee long-range transportation plan : aviation system plan update

    DOT National Transportation Integrated Search

    2005-01-01

    This plan update is streamlined in nature and will only consider the ttates six commercial service airports and 14 regional airports. The tasks completed for this update included an inventory of facilities, aviation industry review, review and upd...

  9. Establishment of a National Accelerator Facility: Design and construction phase

    NASA Astrophysics Data System (ADS)

    1981-06-01

    The main components of an accelerator facility for nuclear physics, isotope production, and radiotherapy in South Africa are in 8-MeV solid pole injector cyclotron and a separated sector cyclotron with a k-value of 200 MeV. Progress made in the development of the light ion injector and in the design of the control and beam transport systems is described. Mechanical and engineering tasks associated with component manufacture are discussed as well as the construction of the building to house the facility and the installation of necessary services.

  10. Compact anti-radon facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fajt, L.; Kouba, P.; Mamedov, F.

    Suppression of radon background is one of main tasks in ultra-low background experiments. The most promising technique for suppression of radon is its adsorption on charcoal. Within the frame of the NEMO-3 experiment, radon trapping facility (RTF) was installed in Modane underground laboratory in 2004. Based on long-term experience with this facility a new compact transportable anti-radon facility was constructed in cooperation among IEAP CTU, SÚRO and ATEKO company. The device provides 20m{sup 3}/h of purified air (air radon activity at the output ∼10mBq/m{sup 3}). The basic features and preliminary results of anti-radon device testing are presented.

  11. Freight movement, port facilities, and economic competitiveness - supplemental task: county-to-county freight movement (national and state level) : final report.

    DOT National Transportation Integrated Search

    2016-04-01

    While commodity movement data is available from several sources, notably from the U.S. : Department of Transportations Freight Analysis Framework (FAF), origins and destinations are heavily : spatially aggregated into FAF zones, which comprise mul...

  12. Assembling, maintaining and servicing Space Station

    NASA Technical Reports Server (NTRS)

    Doetsch, K. H.; Werstiuk, H.; Creasy, W.; Browning, R.

    1987-01-01

    The assembly, maintenance, and servicing of the Space Station and its facilities are discussed. The tools and facilities required for the assembly, maintenance, and servicing of the Station are described; the ground and transportation infrastructures needed for the Space Station are examined. The roles of automation and robotics in reducing the EVAs of the crew, minimizing disturbances to the Space Station environment, and enhancing user friendliness are investigated. Servicing/maintenance tasks are categorized based on: (1) urgency, (2) location of servicing/maintenance, (3) environmental control, (4) dexterity, (5) transportation, (6) crew interactions, (7) equipment interactions, and (8) Space Station servicing architecture. An example of a servicing mission by the Space Station for the Hubble Space Telescope is presented.

  13. FRA/Volpe Center Task Force Observation of Operations at TVE Transrapid Test Facility, Addendum

    DOT National Transportation Integrated Search

    1993-12-01

    This report is an addendum to a report (No. DOT-VNTSC-RR393-PM-93-1) prepared in April : 1993 describing the operations witnessed and the relevant information obtained by nine members : of the FRA/Volpe Center High Speed Guided Ground Transportation ...

  14. Performance related specifications for hydraulic cement concrete used in construction and rehabilitation of ground transportation facilities.

    DOT National Transportation Integrated Search

    1982-01-01

    This report summarizes the work performed on the subject study from June through September 1982. In accordance with the revised work plan for Task 4 of the project approved May 24, 1982, the new completion date for the project is April 30, 1983.

  15. High-speed civil transport issues and technology program

    NASA Technical Reports Server (NTRS)

    Hewett, Marle D.

    1992-01-01

    A strawman program plan is presented, consisting of technology developments and demonstrations required to support the construction of a high-speed civil transport. The plan includes a compilation of technology issues related to the development of a transport. The issues represent technical areas in which research and development are required to allow airframe manufacturers to pursue an HSCT development. The vast majority of technical issues presented require flight demonstrated and validated solutions before a transport development will be undertaken by the industry. The author believes that NASA is the agency best suited to address flight demonstration issues in a concentrated effort. The new Integrated Test Facility at NASA Dryden Flight Research Facility is considered ideally suited to the task of supporting ground validations of proof-of-concept and prototype system demonstrations before night demonstrations. An elaborate ground hardware-in-the-loop (iron bird) simulation supported in this facility provides a viable alternative to developing an expensive fill-scale prototype transport technology demonstrator. Drygen's SR-71 assets, modified appropriately, are a suitable test-bed for supporting flight demonstrations and validations of certain transport technology solutions. A subscale, manned or unmanned flight demonstrator is suitable for flight validation of transport technology solutions, if appropriate structural similarity relationships can be established. The author contends that developing a full-scale prototype transport technology demonstrator is the best alternative to ensuring that a positive decision to develop a transport is reached by the United States aerospace industry.

  16. General Aviation Task Force report

    NASA Technical Reports Server (NTRS)

    1993-01-01

    General aviation is officially defined as all aviation except scheduled airlines and the military. It is the only air transportation to many communities throughout the world. In order to reverse the recent decline in general aviation aircraft produced in the United States, the Task Force recommends that NASA provide the expertise and facilities such as wind tunnels and computer codes for aircraft design. General aviation manufacturers are receptive to NASA's innovations and technological leadership and are expected to be effective users of NASA-generated technologies.

  17. Close-out report with links to abstracts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marmar, Earl S.

    This grant provided A/V support for two technical meetings of the Edge Coordinating Committee: (1) Nov 13, 2013 (co-located with the APS-DPP meeting in Denver, CO) https://ecc.mit.edu/fall-2013-technical-meeting#overlay-context=ecc-meetings; (2) April 28-May 1, 2015 (embedded sessions in the Transport Task Force Meeting, Salem, MA) http://www-internal.psfc.mit.edu/TTF2015/index.html. The ultimate goal of the U.S. Transport Task Force is to develop a physics-based understanding of particle, momentum and heat transport in magnetic fusion devices. This understanding should be of sufficient depth that it allows the development of predictive models of plasma transport that can be validated against experiment, and then used to anticipate the future performancemore » of burning plasmas in ITER, as well as to provide guidance for the design of next-step fusion nuclear science facilities. To achieve success in transport science, it is essential to characterize local fluctuations and transport in toroidal plasmas, to understand the basic mechanisms responsible for transport, and ultimately to control these transport processes. These goals must be pursued in multiple areas, and these topics evolve in order to reflect current interests.« less

  18. Advanced transportation system studies technical area 3: Alternate propulsion subsystem concepts, volume 3

    NASA Technical Reports Server (NTRS)

    Levak, Daniel

    1993-01-01

    The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F-1A Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results, and the program cost estimates are described in more detail in Volume 1 - Executive Summary and in individual Final Task Reports.

  19. Advanced Transportation System Studies. Technical Area 3: Alternate Propulsion Subsystems Concepts. Volume 3; Program Cost Estimates

    NASA Technical Reports Server (NTRS)

    Levack, Daniel J. H.

    2000-01-01

    The objective of this contract was to provide definition of alternate propulsion systems for both earth-to-orbit (ETO) and in-space vehicles (upper stages and space transfer vehicles). For such propulsion systems, technical data to describe performance, weight, dimensions, etc. was provided along with programmatic information such as cost, schedule, needed facilities, etc. Advanced technology and advanced development needs were determined and provided. This volume separately presents the various program cost estimates that were generated under three tasks: the F- IA Restart Task, the J-2S Restart Task, and the SSME Upper Stage Use Task. The conclusions, technical results , and the program cost estimates are described in more detail in Volume I - Executive Summary and in individual Final Task Reports.

  20. Microgravity Science and Applications Program tasks, 1990 revision

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The active research tasks as of the end of the fiscal year 1990 sponsored by the Microgravity Science and Applications Division of the NASA Office of Space Science and Applications are compiled. The purpose is to provide an overview of the program scope for managers and scientists in industry, university, and government communities. The report includes an introductory description of the program, the strategy and overall goal; an index of principle investigators; and a description of each task. A list of recent publications is also provided. The tasks are grouped into six major categories: electronic materials; solidification of metals, alloys, and composites; fluid dynamics and transport phenomena; biotechnology; glasses and ceramics; combustion; experimental technology; facilities; and Physics And Chemistry Experiments (PACE). The tasks are divided into ground-based and flight experiments.

  1. Microgravity science and applications program tasks, 1991 revision

    NASA Technical Reports Server (NTRS)

    1992-01-01

    Presented here is a compilation of the active research tasks for FY 1991 sponsored by the Microgravity Science and Applications Division of the NASA Office of Space Science and Applications. The purpose is to provide an overview of the program scope for managers and scientists in industry, university, and government communities. Included is an introductory description of the program, the strategy and overall goal, identification of the organizational structures and the people involved, and a description of each. The tasks are grouped into several categories: electronic materials; solidification of metals, alloys, and composites; fluids, interfaces, and transport; biotechnology; combustion science; glasses and ceramics; experimental technology, instrumentation, and facilities; and Physical and Chemistry Experiments (PACE). The tasks cover both the ground based and flight programs.

  2. Space Transportation System Meteorological Expert

    NASA Technical Reports Server (NTRS)

    Beller, Arthur E.; Stafford, Sue P.

    1987-01-01

    The STS Meteorological Expert (STSMET) is a long-term project to acquire general Shuttle operational weather forecasting expertise specific to the launch locale, to apply it to Shuttle operational weather forecasting tasks at the Cape Canaveral Forecast Facility, and ultimately to provide an on-line real-time operational aid to the duty forecasters in performing their tasks. Particular attention is given to the development of an approach called scenario-based reasoning, with specific application to summer thunderstorms; this type of reasoning can also be applied to frontal weather phenomena, visibility including fog, and wind shear.

  3. Microgravity Science and Application Program tasks, 1989 revision

    NASA Technical Reports Server (NTRS)

    1990-01-01

    The active research tasks, as of the fiscal year 1989, of the Microgravity Science and Applications Program, NASA Office of Space Science and Applications, involving several NASA Centers and other organizations are compiled. The purpose is to provide an overview of the program scope for managers and scientists in industry, university, and government communities. The scientists in industry, university, and government communities. An introductory description of the program, the strategy and overall goal, identification of the organizational structures and people involved, and a description of each task are included. Also provided is a list of recent publications. The tasks are grouped into several major categories: electronic materials, solidification of metals, alloys, and composites; fluids, interfaces, and transport; biotechnology; glasses and ceramics; combustion science; physical and chemistry experiments (PACE); and experimental technology, facilities, and instrumentation.

  4. Gateway: An earth orbiting transportation node

    NASA Technical Reports Server (NTRS)

    1988-01-01

    University of Texas Mission Design (UTMD) has outlined the components that a space based transportation facility must include in order to support the first decade of Lunar base buildup. After studying anticipated traffic flow to and from the hub, and taking into account crew manhour considerations, propellant storage, orbital transfer vehicle maintenance requirements, and orbital mechanics, UTMD arrived at a design for the facility. The amount of activity directly related to supporting Lunar base traffic is too high to allow the transportation hub to be part of the NASA Space Station. Instead, a separate structure should be constructed and dedicated to handling all transportation-related duties. UTMD found that the structure (named Gateway) would need a permanent crew of four to perform maintenance tasks on the orbital transfer and orbital maneuvering vehicles and to transfer payload from launch vehicles to the orbital transfer vehicles. In addition, quarters for 4 more persons should be allocated for temporary accommodation of Lunar base crew passing through Gateway. UTMD was careful to recommend an expendable structure that can adapt to meet the growing needs of the American space program.

  5. An Airbus arrives at KSC with third MPLM

    NASA Technical Reports Server (NTRS)

    2001-01-01

    An Airbus '''Beluga''' air cargo plane, The Super Transporter, lands at KSC's Shuttle Landing Facility. Its cargo, from the factory of Alenia Aerospazio in Turin, Italy, is the Italian Space Agency's Multi-Purpose Logistics Module Donatello, the third of three for the International Space Station. The module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.

  6. An Airbus arrives at KSC with third MPLM

    NASA Technical Reports Server (NTRS)

    2001-01-01

    An Airbus '''Beluga''' air cargo plane, The Super Transporter, arrives at KSC's Shuttle Landing Facility from the factory of Alenia Aerospazio in Turin, Italy. Its cargo is the Italian Space Agency's Multi-Purpose Logistics Module Donatello, the third of three for the International Space Station. The module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Following the Department of Energy's announcement in April 1985 that three Tennessee sites were to be considered for the Monitored Retrievable Storage facility, Governor Lamar Alexander initiated a review of the proposal to be coordinated by his Safe Growth Team. Roane County and the City of Oak Ridge, the local governments sharing jurisdiction over DOE's primary and secondary sites, were invited to participate in the state's review of the MRS proposal. Many issues related to the proposed MRS are being considered by the Governor's Safe Growth Team. The primary objective of the Clinch River MRS Task Force has been tomore » determine whether the proposed Monitored Retrievable Storage facility should be accepted by the local governments, and if so, under what conditions. The Clinch River MRS Task Force is organized into an Executive Committee cochaired by the Roane County Executive and Mayor of Oak Ridge and three Study Groups focusing on environmental (including health and safety), socioeconomic, and transportation issues.« less

  8. Unequal-area, fixed-shape facility layout problems using the firefly algorithm

    NASA Astrophysics Data System (ADS)

    Ingole, Supriya; Singh, Dinesh

    2017-07-01

    In manufacturing industries, the facility layout design is a very important task, as it is concerned with the overall manufacturing cost and profit of the industry. The facility layout problem (FLP) is solved by arranging the departments or facilities of known dimensions on the available floor space. The objective of this article is to implement the firefly algorithm (FA) for solving unequal-area, fixed-shape FLPs and optimizing the costs of total material handling and transportation between the facilities. The FA is a nature-inspired algorithm and can be used for combinatorial optimization problems. Benchmark problems from the previous literature are solved using the FA. To check its effectiveness, it is implemented to solve large-sized FLPs. Computational results obtained using the FA show that the algorithm is less time consuming and the total layout costs for FLPs are better than the best results achieved so far.

  9. Full-Scale Accelerated Testing of Multi-axial Geogrid Stabilized Flexible Pavements

    DTIC Science & Technology

    2017-06-01

    costs and reduced budgets, transportation officials are often tasked with applying innovative solutions to pavement design and construction projects... pavement designers . 1.2 Objective The objective of this effort was to construct and traffic full-scale flexible pavement sections to provide...Development Center (ERDC) constructed the full-scale test section as designed by Tensar under shelter in its Hangar 2 Pavement Test Facility. During

  10. Flexible automation of cell culture and tissue engineering tasks.

    PubMed

    Knoll, Alois; Scherer, Torsten; Poggendorf, Iris; Lütkemeyer, Dirk; Lehmann, Jürgen

    2004-01-01

    Until now, the predominant use cases of industrial robots have been routine handling tasks in the automotive industry. In biotechnology and tissue engineering, in contrast, only very few tasks have been automated with robots. New developments in robot platform and robot sensor technology, however, make it possible to automate plants that largely depend on human interaction with the production process, e.g., for material and cell culture fluid handling, transportation, operation of equipment, and maintenance. In this paper we present a robot system that lends itself to automating routine tasks in biotechnology but also has the potential to automate other production facilities that are similar in process structure. After motivating the design goals, we describe the system and its operation, illustrate sample runs, and give an assessment of the advantages. We conclude this paper by giving an outlook on possible further developments.

  11. A space transportation system operations model

    NASA Technical Reports Server (NTRS)

    Morris, W. Douglas; White, Nancy H.

    1987-01-01

    Presented is a description of a computer program which permits assessment of the operational support requirements of space transportation systems functioning in both a ground- and space-based environment. The scenario depicted provides for the delivery of payloads from Earth to a space station and beyond using upper stages based at the station. Model results are scenario dependent and rely on the input definitions of delivery requirements, task times, and available resources. Output is in terms of flight rate capabilities, resource requirements, and facility utilization. A general program description, program listing, input requirements, and sample output are included.

  12. An Airbus arrives at KSC with third MPLM

    NASA Technical Reports Server (NTRS)

    2001-01-01

    An Airbus '''Beluga''' air cargo plane, The Super Transporter, taxis onto the parking apron at KSC's Shuttle Landing Facility. Its cargo, from the factory of Alenia Aerospazio in Turin, Italy, is the Italian Space Agency's Multi-Purpose Logistics Module Donatello, the third of three for the International Space Station. The module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.

  13. KSC01pp0234

    NASA Image and Video Library

    2001-02-01

    An Airbus “Beluga” air cargo plane, The Super Transporter, taxis onto the parking apron at KSC’s Shuttle Landing Facility. Its cargo, from the factory of Alenia Aerospazio in Turin, Italy, is the Italian Space Agency’s Multi-Purpose Logistics Module Donatello, the third of three for the International Space Station. The module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    Following the Department of Energy`s announcement in April 1985 that three Tennessee sites were to be considered for the Monitored Retrievable Storage facility, Governor Lamar Alexander initiated a review of the proposal to be coordinated by his Safe Growth Team. Roane County and the City of Oak Ridge, the local governments sharing jurisdiction over DOE`s primary and secondary sites, were invited to participate in the state`s review of the MRS proposal. Many issues related to the proposed MRS are being considered by the Governor`s Safe Growth Team. The primary objective of the Clinch River MRS Task Force has been tomore » determine whether the proposed Monitored Retrievable Storage facility should be accepted by the local governments, and if so, under what conditions. The Clinch River MRS Task Force is organized into an Executive Committee cochaired by the Roane County Executive and Mayor of Oak Ridge and three Study Groups focusing on environmental (including health and safety), socioeconomic, and transportation issues.« less

  15. 49 CFR 37.41 - Construction of transportation facilities by public entities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Construction of transportation facilities by... TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Transportation Facilities § 37.41 Construction of transportation facilities by public entities. (a) A public entity shall construct any new facility to be used in...

  16. Use of the Homeland-Defense Operational Planning System (HOPS) for Emergency Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Durling, Jr., R L; Price, D E

    2005-12-16

    The Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging Lawrence Livermore National Laboratory's expertise in weapons systems and in sparse information analysis to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors,more » HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities will be presented.« less

  17. Risk Assessment Using The Homeland-Defense Operational Planning System (HOPS)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Price, D E; Durling, R L

    2005-10-10

    The Homeland-Defense Operational Planning System (HOPS), is a new operational planning tool leveraging Lawrence Livermore National Laboratory's expertise in weapons systems and in sparse information analysis to support the defense of the U.S. homeland. HOPS provides planners with a basis to make decisions to protect against acts of terrorism, focusing on the defense of facilities critical to U.S. infrastructure. Criticality of facilities, structures, and systems is evaluated on a composite matrix of specific projected casualty, economic, and sociopolitical impact bins. Based on these criteria, significant unidentified vulnerabilities are identified and secured. To provide insight into potential successes by malevolent actors,more » HOPS analysts strive to base their efforts mainly on unclassified open-source data. However, more cooperation is needed between HOPS analysts and facility representatives to provide an advantage to those whose task is to defend these facilities. Evaluated facilities include: refineries, major ports, nuclear power plants and other nuclear licensees, dams, government installations, convention centers, sports stadiums, tourist venues, and public and freight transportation systems. A generalized summary of analyses of U.S. infrastructure facilities will be presented.« less

  18. Mass tracking and material accounting in the Integral Fast Reactor (IFR)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Orechwa, Y.; Adams, C.H.; White, A.M.

    1991-01-01

    The Integral Fast Reactor (IFR) is a generic advanced liquid metal cooled reactor concept being developed at Argonne National Laboratory (ANL). There are a number of technical features of the IFR which contribute to its potential as a next-generation reactor. These are associated with large safety margins with regard to off-normal events involving the heat transport system, and the use of metallic fuel which makes possible the utilization of innovative fuel cycle processes. The latter feature permits fuel cycle closure the compact, low-cost reprocessing facilities, collocated with the reactor plant. These primary features are being demonstrated in the facilities atmore » ANL-West, utilizing Experimental Breeder Reactor 2 and the associated Fuel Cycle Facility (FCF) as an IFR prototype. The demonstration of this IFR prototype includes the design and implementation of the Mass-Tracking System (MTG). In this system, data from the operations of the FCF, including weights and batch-process parameters, are collected and maintained by the MTG running on distributed workstations. The components of the MTG System include: (1) an Oracle database manager with a Fortran interface, (2) a set of MTG Tasks'' which collect, manipulate and report data, (3) a set of MTG Terminal Sessions'' which provide some interactive control of the Tasks, and (4) a set of servers which manage the Tasks and which provide the communications link between the MTG System and Operator Control Stations, which control process equipment and monitoring devices within the FCF.« less

  19. Health facility service availability and readiness for intrapartum and immediate postpartum care in Malawi: A cross-sectional survey

    PubMed Central

    Oseni, Lolade; Mtimuni, Angella; Sethi, Reena; Rashidi, Tambudzai; Kachale, Fannie; Rawlins, Barbara; Gupta, Shivam

    2017-01-01

    This analysis seeks to identify strengths and gaps in the existing facility capacity for intrapartum and immediate postpartum fetal and neonatal care, using data collected as a part of Malawi’s Helping Babies Breath program evaluation. From August to September 2012, the Maternal and Child Health Integrated Program (MCHIP) conducted a cross-sectional survey in 84 Malawian health facilities to capture current health facility service availability and readiness and health worker capacity and practice pertaining to labor, delivery, and immediate postpartum care. The survey collected data on availability of equipment, supplies, and medications, and health worker knowledge and performance scores on intrapartum care simulation and actual management of real clients at a subset of facilities. We ran linear regression models to identify predictors of high simulation performance of routine delivery care and management of asphyxiated newborns across all facilities surveyed. Key supplies for infection prevention and thermal care of the newborn were found to be missing in many of the surveyed facilities. At the health center level, 75% had no clinician trained in basic emergency obstetric care or newborn care and 39% had no midwife trained in the same. We observed that there were no proportional increases in available transport and staff at a facility as catchment population increased. In simulations of management of newborns with breathing problems, health workers were able to complete a median of 10 out of 16 tasks for a full-term birth case scenario and 20 out of 30 tasks for a preterm birth case scenario. Health workers who had more years of experience appeared to perform worse. Our study provides a benchmark and highlights gaps for future evaluations and studies as Malawi continues to make strides in improving facility-based care. Further progress in reducing the burden of neonatal and fetal death in Malawi will be partly predicated on guaranteeing properly equipped and staffed facilities in addition to ensuring the presence of skilled health workers. PMID:28301484

  20. Health facility service availability and readiness for intrapartum and immediate postpartum care in Malawi: A cross-sectional survey.

    PubMed

    Kozuki, Naoko; Oseni, Lolade; Mtimuni, Angella; Sethi, Reena; Rashidi, Tambudzai; Kachale, Fannie; Rawlins, Barbara; Gupta, Shivam

    2017-01-01

    This analysis seeks to identify strengths and gaps in the existing facility capacity for intrapartum and immediate postpartum fetal and neonatal care, using data collected as a part of Malawi's Helping Babies Breath program evaluation. From August to September 2012, the Maternal and Child Health Integrated Program (MCHIP) conducted a cross-sectional survey in 84 Malawian health facilities to capture current health facility service availability and readiness and health worker capacity and practice pertaining to labor, delivery, and immediate postpartum care. The survey collected data on availability of equipment, supplies, and medications, and health worker knowledge and performance scores on intrapartum care simulation and actual management of real clients at a subset of facilities. We ran linear regression models to identify predictors of high simulation performance of routine delivery care and management of asphyxiated newborns across all facilities surveyed. Key supplies for infection prevention and thermal care of the newborn were found to be missing in many of the surveyed facilities. At the health center level, 75% had no clinician trained in basic emergency obstetric care or newborn care and 39% had no midwife trained in the same. We observed that there were no proportional increases in available transport and staff at a facility as catchment population increased. In simulations of management of newborns with breathing problems, health workers were able to complete a median of 10 out of 16 tasks for a full-term birth case scenario and 20 out of 30 tasks for a preterm birth case scenario. Health workers who had more years of experience appeared to perform worse. Our study provides a benchmark and highlights gaps for future evaluations and studies as Malawi continues to make strides in improving facility-based care. Further progress in reducing the burden of neonatal and fetal death in Malawi will be partly predicated on guaranteeing properly equipped and staffed facilities in addition to ensuring the presence of skilled health workers.

  1. 49 CFR Appendix A to Part 37 - Modifications to Standards for Accessible Transportation Facilities

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Transportation Facilities A Appendix A to Part 37 Transportation Office of the Secretary of Transportation...—Modifications to Standards for Accessible Transportation Facilities The Department of Transportation, in § 37.9 of this part, adopts as its regulatory standards for accessible transportation facilities the revised...

  2. 49 CFR 37.61 - Public transportation programs and activities in existing facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... existing facilities. 37.61 Section 37.61 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Transportation Facilities § 37.61 Public transportation programs and activities in existing facilities. (a) A public entity shall operate a designated...

  3. 49 CFR 37.45 - Construction and alteration of transportation facilities by private entities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... facilities by private entities. 37.45 Section 37.45 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Transportation Facilities § 37.45 Construction and alteration of transportation facilities by private entities. In constructing and altering transit...

  4. 49 CFR 37.43 - Alteration of transportation facilities by public entities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Alteration of transportation facilities by public... transportation facilities by public entities. (a)(1) When a public entity alters an existing facility or a part of an existing facility used in providing designated public transportation services in a way that...

  5. STS payloads mission control study continuation phase A-1. Volume 2-B: Task 2. Evaluation and refinement of implementation guidelines for the selected STS payload operator concept

    NASA Technical Reports Server (NTRS)

    1976-01-01

    The functions of Payload Operations Control Centers (POCC) at JSC, GSFC, JPL, and non-NASA locations are analyzed to establish guidelines for standardization, and facilitate the development of a fully integrated NASA-wide system of ground facilities for all classes of payloads. Operational interfaces between the space transportation system operator and the payload operator elements are defined. The advantages and disadvantages of standardization are discussed.

  6. Development of Predictive Models of Advanced Propulsion Concepts for Low Cost Space Transportation

    NASA Technical Reports Server (NTRS)

    Morrell, Michael Randy

    2002-01-01

    This final report presents the Graduate Student Research Program (GSRP) work Mr. Morrell was able to complete as a summer intern at NASA MSFS during the summer of 2001, and represents work completed from inception through project termination. The topics include: 1) NASA TD40 Organization; 2) Combustion Physics Lab; 3) Advanced Hydrocarbon Fuels; 4) GSRP Summer Tasks; 5) High Pressure Facility Installation; 6) High Pressure Combustion Issues; 7) High Energy Density Matter (HEDM) Hydrocarbons; and 8) GSRP Summer Intern Summary.

  7. The UCP is placed in payload canister in SSPF

    NASA Technical Reports Server (NTRS)

    2000-01-01

    The Integrated Cargo Carrier (ICC), with equipment on top, sits in a workstand in the Space Station Processing Facility. It will be moved into the payload canister for transport to Launch Pad 39B in preparation for mission STS-106, scheduled to launch Sept. 8 at 8:31 a.m. EDT. During the mission to the International Space Station, the crew will complete service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew

  8. Space station data system analysis/architecture study. Task 3: Trade studies, DR-5, volume 1

    NASA Technical Reports Server (NTRS)

    1985-01-01

    The primary objective of Task 3 is to provide additional analysis and insight necessary to support key design/programmatic decision for options quantification and selection for system definition. This includes: (1) the identification of key trade study topics; (2) the definition of a trade study procedure for each topic (issues to be resolved, key inputs, criteria/weighting, methodology); (3) conduct tradeoff and sensitivity analysis; and (4) the review/verification of results within the context of evolving system design and definition. The trade study topics addressed in this volume include space autonomy and function automation, software transportability, system network topology, communications standardization, onboard local area networking, distributed operating system, software configuration management, and the software development environment facility.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Loar, J.M.; Adams, S.M.; Bailey, R.D.

    As a condition of the National Pollutant Discharge Elimination System (NPDES) permit issued to Oak Ridge National Laboratory (ORNL) on April 1, 1985, a Biological Monitoring and Abatement Program (BMAP) was developed for White Oak Creek (WOC); selected tributaries of WOC, including Fifth Creek, First Creek, Melton Branch, and Northwest Tributary; and the Clinch River. The BMAP currently consists of six major tasks that address both radiological and nonradiological contaminants in the aquatic and terrestrial environs at ORNL. These are (1) toxicity monitoring, (2) bioaccumulation monitoring of nonradiological contaminants in aquatic biota, (3) biological indicator studies, (4) instream ecological monitoring,more » (5) assessment of contaminants in the terrestrial environment, and (6) radioecology of WOC and White Oak Lake (WOL). The investigation of contaminant transport, distribution, and fate in the WOC embayment-Clinch River-Watts Bar Reservoir system was originally a task of the BMAP but, in 1988, was incorporated into the Resource Conservation and Recovery Act Facility Investigation for the Clinch River, a separate study to assess offsite contamination from all three Department of Energy facilities in Oak Ridge.« less

  10. 49 CFR 37.41 - Construction of transportation facilities by public entities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... public entities. 37.41 Section 37.41 Transportation Office of the Secretary of Transportation... transportation facilities by public entities. (a) A public entity shall construct any new facility to be used in providing designated public transportation services so that the facility is readily accessible to and usable...

  11. The Impact of Structural Vibration on Flying Qualities of a Supersonic Transport

    NASA Technical Reports Server (NTRS)

    Raney, David L.; Jackson, E. Bruce; Buttrill, Carey S.; Adams, William M.

    2001-01-01

    A piloted simulation experiment has been conducted in the NASA Langley Visual/Motion Simulator facility to address the impact of dynamic aeroelastic effects on flying qualities of a supersonic transport. The intent of this experiment was to determine the effectiveness of several measures that may be taken to reduce the impact of aircraft flexibility on piloting tasks. Potential solutions that were examined included structural stiffening, active vibration suppression, and elimination of visual cues associated with the elastic modes. A series of parametric configurations was evaluated by six test pilots for several types of maneuver tasks. During the investigation, several incidents were encountered in which cockpit vibrations due to elastic modes fed back into the control stick through involuntary motions of the pilot's upper body and arm. The phenomenon, referred to as biodynamic coupling, is evidenced by a resonant peak in the power spectrum of the pilot's stick inputs at a structural mode frequency. The results of the investigation indicate that structural stiffening and compensation of the visual display were of little benefit in alleviating the impact of elastic dynamics on the piloting tasks, while increased damping and elimination of control-effector excitation of the lowest frequency modes offered great improvements when applied in sufficient degree.

  12. National facilities study. Volume 4: Space operations facilities task group

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The principal objectives of the National Facilities Study (NFS) were to: (1) determine where U.S. facilities do not meet national aerospace needs; (2) define new facilities required to make U.S. capabilities 'world class' where such improvements are in the national interest; (3) define where consolidation and phase-out of existing facilities is appropriate; and (4) develop a long-term national plan for world-class facility acquisition and shared usage. The Space Operations Facilities Task Group defined discrete tasks to accomplish the above objectives within the scope of the study. An assessment of national space operations facilities was conducted to determine the nation's capability to meet the requirements of space operations during the next 30 years. The mission model used in the study to define facility requirements is described in Volume 3. Based on this model, the major focus of the Task Group was to identify any substantive overlap or underutilization of space operations facilities and to identify any facility shortfalls that would necessitate facility upgrades or new facilities. The focus of this initial study was directed toward facility recommendations related to consolidations, closures, enhancements, and upgrades considered necessary to efficiently and effectively support the baseline requirements model. Activities related to identifying facility needs or recommendations for enhancing U.S. international competitiveness and achieving world-class capability, where appropriate, were deferred to a subsequent study phase.

  13. A simulation-based probabilistic design method for arctic sea transport systems

    NASA Astrophysics Data System (ADS)

    Martin, Bergström; Ove, Erikstad Stein; Sören, Ehlers

    2016-12-01

    When designing an arctic cargo ship, it is necessary to consider multiple stochastic factors. This paper evaluates the merits of a simulation-based probabilistic design method specifically developed to deal with this challenge. The outcome of the paper indicates that the incorporation of simulations and probabilistic design parameters into the design process enables more informed design decisions. For instance, it enables the assessment of the stochastic transport capacity of an arctic ship, as well as of its long-term ice exposure that can be used to determine an appropriate level of ice-strengthening. The outcome of the paper also indicates that significant gains in transport system cost-efficiency can be obtained by extending the boundaries of the design task beyond the individual vessel. In the case of industrial shipping, this allows for instance the consideration of port-based cargo storage facilities allowing for temporary shortages in transport capacity and thus a reduction in the required fleet size / ship capacity.

  14. Safety and Security of Radioactive Sealed and Disused/Orphan Sources in Ukraine - German Contribution - 13359

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Brasser, Thomas; Hertes, Uwe; Meyer, Thorsten

    2013-07-01

    Within the scope of 'Nuclear Security of Radioactive Sources', the German government implemented the modernization of Ukrainian State Production Company's transport and storage facility for radioactive sources (TSF) in Kiev. The overall management of optimizing the physical protection of the storage facility (including the construction of a hot cell for handling the radioactive sources) is currently carried out by the German Federal Foreign Office (AA). AA jointly have assigned Gesellschaft fuer Anlagen- und Reaktorsicherheit (GRS) mbH, Germany's leading expert institution in the area of nuclear safety and waste management, to implement the project and to ensure transparency by financial andmore » technical monitoring. Sealed radioactive sources are widely used in industry, medicine and research. Their life cycle starts with the production and finally ends with the interim/long-term storage of the disused sources. In Ukraine, IZOTOP is responsible for all radioactive sources throughout their life cycle. IZOTOP's transport and storage facility (TSF) is the only Ukrainian storage facility for factory-fresh radioactive sources up to an activity of about 1 million Ci (3.7 1016 Bq). The TSF is specially designed for the storage and handling of radioactive sources. Storage began in 1968, and is licensed by the Ukrainian state authorities. Beside the outdated state of TSF's physical protection and the vulnerability of the facility linked with it, the lack of a hot cell for handling and repacking radioactive sources on the site itself represents an additional potential hazard. The project, financed by the German Federal Foreign Office, aims to significantly improve the security of radioactive sources during their storage and handling at the TSF site. Main tasks of the project are a) the modernization of the physical protection of the TSF itself in order to prevent any unauthorized access to radioactive sources as well as b) the construction of a hot cell to reduce the number of transports of radioactive sources within the city of Kiev. In future, the new established hot cell at IZOTOP's transport and storage facility will be useful for identification and characterization of orphan/disused radioactive sources. The projects implemented are performed in accordance with international recommendations (e. g. IAEA) and national normative documents and will make a crucial contribution towards an improved safety and security management of radioactive sources in Ukraine. (authors)« less

  15. 25 CFR 170.806 - What is an IRR Transportation Facilities Maintenance Management System?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.806 What is an IRR Transportation Facilities Maintenance Management System? An IRR Transportation Facilities Maintenance Management... 25 Indians 1 2010-04-01 2010-04-01 false What is an IRR Transportation Facilities Maintenance...

  16. Americans with Disabilities Act: Accessibility Guidelines for Buildings and Facilities, Transportation Facilities, Transportation Vehicles.

    ERIC Educational Resources Information Center

    Architectural and Transportation Barriers Compliance Board, Washington, DC.

    Guidelines are presented regarding accessibility to buildings and facilities, transportation facilities, and transportation vehicles by individuals with disabilities, under the Americans with Disabilities Act of 1990. These guidelines are to be applied during building design, construction, and alteration. Part 1 offers detailed facility…

  17. MPLM Donatello is offloaded at the SLF

    NASA Technical Reports Server (NTRS)

    2001-01-01

    At the Shuttle Landing Facility, cranes help offload the Italian Space Agency's Multi-Purpose Logistics Module Donatello from the Airbus '''Beluga''' air cargo plane. The third of three for the International Space Station, the module will be moved on a transporter to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.

  18. 49 CFR 37.61 - Public transportation programs and activities in existing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Public transportation programs and activities in... TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Transportation Facilities § 37.61 Public transportation programs and activities in existing facilities. (a) A public entity shall operate a designated...

  19. National facilities study. Volume 2: Task group on aeronautical research and development facilities report

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The Task Group on Aeronautics R&D Facilities examined the status and requirements for aeronautics facilities against the competitive need. Emphasis was placed on ground-based facilities for subsonic, supersonic and hypersonic aerodynamics, and propulsion. Subsonic and transonic wind tunnels were judged to be most critical and of highest priority. Results of the study are presented.

  20. Study of launch site processing and facilities for future launch vehicles

    NASA Astrophysics Data System (ADS)

    Shaffer, Rex

    1995-03-01

    The purpose of this research is to provide innovative and creative approaches to assess the impact to the Kennedy Space Center and other launch sites for a range of candidate manned and unmanned space transportation systems. The general scope of the research includes the engineering activities, analyses, and evaluations defined in the four tasks below: (1) development of innovative approaches and computer aided tools; (2) operations analyses of launch vehicle concepts and designs; (3) assessment of ground operations impacts; and (4) development of methodologies to identify promising technologies.

  1. SPACEHAB module is placed in payload canister in SSPF

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Workers in the Space Station Processing Facility check the progress of the SPACEHAB module as it is lowered toward the payload canister below. The module, part of the payload on mission STS-106, will be placed in the payload canister for transport to the launch pad. STS-106 is scheduled to launch Sept. 8 at 8:31 a.m. EDT. During the mission to the International Space Station, the crew will complete service module support tasks on orbit, transfer supplies and outfit the Space Station for the first long-duration crew.

  2. Guam Strategic Energy Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conrad, M. D.

    2013-07-01

    Describes various energy strategies available to Guam to meet the territory's goal of diversifying fuel sources and reducing fossil energy consumption 20% by 2020.The information presented in this strategic energy plan will be used by the Guam Energy Task Force to develop an energy action plan. Available energy strategies include policy changes, education and outreach, reducing energy consumption at federal facilities, and expanding the use of a range of energy technologies, including buildings energy efficiency and conservation, renewable electricity production, and alternative transportation. The strategies are categorized based on the time required to implement them.

  3. Porous liquids: A promising class of media for gas separation

    DOE PAGES

    Zhang, Jinshui; Chai, Song -Hai; Qiao, Zhen -An; ...

    2014-11-17

    In porous liquids with empty cavities we successfully has been successfully fabricated by surface engineering of hollow structures with suitable corona and canopy species. By taking advantage of the liquid-like polymeric matrices as a separation medium and the empty cavities as gas transport pathway, this unique porous liquid can function as a promising candidate for gas separation. A facile synthetic strategy can be further extended to other types of nanostructure-based porous liquid fabrication, opening up new opportunities for preparation of porous liquids with attractive properties for specific tasks.

  4. Study of launch site processing and facilities for future launch vehicles

    NASA Technical Reports Server (NTRS)

    Shaffer, Rex

    1995-01-01

    The purpose of this research is to provide innovative and creative approaches to assess the impact to the Kennedy Space Center and other launch sites for a range of candidate manned and unmanned space transportation systems. The general scope of the research includes the engineering activities, analyses, and evaluations defined in the four tasks below: (1) development of innovative approaches and computer aided tools; (2) operations analyses of launch vehicle concepts and designs; (3) assessment of ground operations impacts; and (4) development of methodologies to identify promising technologies.

  5. 25 CFR Appendix A to Subpart G - List of Activities Eligible for Funding Under BIA Transportation Facility Maintenance Program

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Transportation Facility Maintenance Program A Appendix A to Subpart G Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance Pt. 170... Transportation Facility Maintenance Program The following activities are eligible for BIA Transportation Facility...

  6. 76 FR 9276 - Tank Vessel and Marine Transportation-Related Facility Response Plans for Hazardous Substances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ... and USCG-1999-5705] RIN 2115-AE87 and 2115-AE88 Tank Vessel and Marine Transportation-Related Facility... Marine Transportation-Related Facility Response Plans for Hazardous Substances (USCG-1999-5705). The... marine transportation-related facilities, that could reasonably be expected to cause substantial harm to...

  7. A demonstration of a low cost approach to security at shipping facilities and ports

    NASA Astrophysics Data System (ADS)

    Huck, Robert C.; Al Akkoumi, Mouhammad K.; Herath, Ruchira W.; Sluss, James J., Jr.; Radhakrishnan, Sridhar; Landers, Thomas L.

    2010-04-01

    Government funding for the security at shipping facilities and ports is limited so there is a need for low cost scalable security systems. With over 20 million sea, truck, and rail containers entering the United States every year, these facilities pose a large risk to security. Securing these facilities and monitoring the variety of traffic that enter and leave is a major task. To accomplish this, the authors have developed and fielded a low cost fully distributed building block approach to port security at the inland Port of Catoosa in Oklahoma. Based on prior work accomplished in the design and fielding of an intelligent transportation system in the United States, functional building blocks, (e.g. Network, Camera, Sensor, Display, and Operator Console blocks) can be assembled, mixed and matched, and scaled to provide a comprehensive security system. The following functions are demonstrated and scaled through analysis and demonstration: Barge tracking, credential checking, container inventory, vehicle tracking, and situational awareness. The concept behind this research is "any operator on any console can control any device at any time."

  8. SRS H1616 hydride transport vessel qualification report

    DOT National Transportation Integrated Search

    1998-12-01

    This report serves as the design qualification basis for both transport and facility use. headings identify report sections as containing qualification information for transport use, facility use, or both transport and facility use. This report demon...

  9. M.I.N.G., Mars Investment for a New Generation: Robotic construction of a permanently manned Mars base

    NASA Technical Reports Server (NTRS)

    Amos, Jeff; Beeman, Randy; Brown, Susan; Calhoun, John; Hill, John; Howorth, Lark; Mcfaden, Clay; Nguyen, Paul; Reid, Philip; Rexrode, Stuart

    1989-01-01

    A basic procedure for robotically constructing a manned Mars base is outlined. The research procedure was divided into three areas: environment, robotics, and habitat. The base as designed will consist of these components: two power plants, communication facilities, a habitat complex, and a hangar, a garage, recreation and manufacturing facilities. The power plants will be self-contained nuclear fission reactors placed approx. 1 km from the base for safety considerations. The base communication system will use a combination of orbiting satellites and surface relay stations. This system is necessary for robotic contact with Phobos and any future communication requirements. The habitat complex will consist of six self-contained modules: core, biosphere, science, living quarters, galley/storage, and a sick bay which will be brought from Phobos. The complex will be set into an excavated hole and covered with approximately 0.5 m of sandbags to provide radiation protection for the astronauts. The recreation, hangar, garage, and manufacturing facilities will each be transformed from the four one-way landers. The complete complex will be built by autonomous, artificially intelligent robots. Robots incorporated into the design are as follows: Large Modular Construction Robots with detachable arms capable of large scale construction activities; Small Maneuverable Robotic Servicers capable of performing delicate tasks normally requiring a suited astronaut; and a trailer vehicle with modular type attachments to complete specific tasks; and finally, Mobile Autonomous Rechargeable Transporters capable of transferring air and water from the manufacturing facility to the habitat complex.

  10. M.I.N.G., Mars Investment for a New Generation: Robotic construction of a permanently manned Mars base

    NASA Astrophysics Data System (ADS)

    Amos, Jeff; Beeman, Randy; Brown, Susan; Calhoun, John; Hill, John; Howorth, Lark; McFaden, Clay; Nguyen, Paul; Reid, Philip; Rexrode, Stuart

    1989-05-01

    A basic procedure for robotically constructing a manned Mars base is outlined. The research procedure was divided into three areas: environment, robotics, and habitat. The base as designed will consist of these components: two power plants, communication facilities, a habitat complex, and a hanger, a garage, recreation and manufacturing facilities. The power plants will be self-contained nuclear fission reactors placed approx. 1 km from the base for safety considerations. The base communication system will use a combination of orbiting satellites and surface relay stations. This system is necessary for robotic contact with Phobos and any future communication requirements. The habitat complex will consist of six self-contained modules: core, biosphere, science, living quarters, galley/storage, and a sick bay which will be brought from Phobos. The complex will be set into an excavated hole and covered with approximately 0.5 m of sandbags to provide radiation protection for the astronauts. The recreation, hangar, garage, and manufacturing facilities will each be transformed from the four one-way landers. The complete complex will be built by autonomous, artificially intelligent robots. Robots incorporated into the design are as follows: Large Modular Construction Robots with detachable arms capable of large scale construction activities; Small Maneuverable Robotic Servicers capable of performing delicate tasks normally requiring a suited astronaut; and a trailer vehicle with modular type attachments to complete specific tasks; and finally, Mobile Autonomous Rechargeable Transporters capable of transferring air and water from the manufacturing facility to the habitat complex.

  11. Empirical Profiling of Cold Hydrogen Plumes Formed from Venting Of LH2 Storage Vessels: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buttner, William J; Rivkin, Carl H; Schmidt, Kara

    Liquid hydrogen (LH2) storage is a viable approach to assuring sufficient hydrogen capacity at commercial fuelling stations. Presently, LH2 is produced at remote facilities and then transported to the end-use site by road vehicles (i.e., LH2 tanker trucks). Venting of hydrogen to depressurize the transport storage tank is a routine part of the LH2 delivery process. The behaviour of cold hydrogen plumes has not been well-characterized because empirical field data is essentially non-existent. The NFPA 2 Hydrogen Storage Safety Task Group, which consists of hydrogen producers, safety experts, and CFD modellers, has identified the lack of understanding of hydrogen dispersionmore » during LH2 venting of storage vessel as a critical gap for establishing safety distances at LH2 facilities, especially commercial hydrogen fuelling stations. To address this need, the NREL sensor laboratory, in collaboration with the NFPA 2 Safety Task Group developed the Cold Hydrogen Plume Analyzer to empirically characterize the hydrogen plume formed during LH2 storage tank venting. A prototype Analyzer was developed and field-deployed at an actual LH2 venting operation with critical findings that included: - H2 being detected as much as 2 m lower than the release point, which is not predicted by existing models - A small and inconsistent correlation between oxygen depletion and the hydrogen concentration - A negligible to non-existent correlation between in-situ temperature and the hydrogen concentration The Analyzer is currently being upgraded for enhanced metrological capabilities including improved real-time spatial and temporal profiling of the plume and tracking of prevailing weather conditions. Additional deployments are planned to monitor plume behaviour under different wind, humidity, and temperatures. This data will be shared with the NFPA 2 Safety Task Group and ultimately will be used support theoretical models and code requirements prescribed in NFPA 2.« less

  12. Virtual machine provisioning, code management, and data movement design for the Fermilab HEPCloud Facility

    NASA Astrophysics Data System (ADS)

    Timm, S.; Cooper, G.; Fuess, S.; Garzoglio, G.; Holzman, B.; Kennedy, R.; Grassano, D.; Tiradani, A.; Krishnamurthy, R.; Vinayagam, S.; Raicu, I.; Wu, H.; Ren, S.; Noh, S.-Y.

    2017-10-01

    The Fermilab HEPCloud Facility Project has as its goal to extend the current Fermilab facility interface to provide transparent access to disparate resources including commercial and community clouds, grid federations, and HPC centers. This facility enables experiments to perform the full spectrum of computing tasks, including data-intensive simulation and reconstruction. We have evaluated the use of the commercial cloud to provide elasticity to respond to peaks of demand without overprovisioning local resources. Full scale data-intensive workflows have been successfully completed on Amazon Web Services for two High Energy Physics Experiments, CMS and NOνA, at the scale of 58000 simultaneous cores. This paper describes the significant improvements that were made to the virtual machine provisioning system, code caching system, and data movement system to accomplish this work. The virtual image provisioning and contextualization service was extended to multiple AWS regions, and to support experiment-specific data configurations. A prototype Decision Engine was written to determine the optimal availability zone and instance type to run on, minimizing cost and job interruptions. We have deployed a scalable on-demand caching service to deliver code and database information to jobs running on the commercial cloud. It uses the frontiersquid server and CERN VM File System (CVMFS) clients on EC2 instances and utilizes various services provided by AWS to build the infrastructure (stack). We discuss the architecture and load testing benchmarks on the squid servers. We also describe various approaches that were evaluated to transport experimental data to and from the cloud, and the optimal solutions that were used for the bulk of the data transport. Finally, we summarize lessons learned from this scale test, and our future plans to expand and improve the Fermilab HEP Cloud Facility.

  13. Virtual Machine Provisioning, Code Management, and Data Movement Design for the Fermilab HEPCloud Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Timm, S.; Cooper, G.; Fuess, S.

    The Fermilab HEPCloud Facility Project has as its goal to extend the current Fermilab facility interface to provide transparent access to disparate resources including commercial and community clouds, grid federations, and HPC centers. This facility enables experiments to perform the full spectrum of computing tasks, including data-intensive simulation and reconstruction. We have evaluated the use of the commercial cloud to provide elasticity to respond to peaks of demand without overprovisioning local resources. Full scale data-intensive workflows have been successfully completed on Amazon Web Services for two High Energy Physics Experiments, CMS and NOνA, at the scale of 58000 simultaneous cores.more » This paper describes the significant improvements that were made to the virtual machine provisioning system, code caching system, and data movement system to accomplish this work. The virtual image provisioning and contextualization service was extended to multiple AWS regions, and to support experiment-specific data configurations. A prototype Decision Engine was written to determine the optimal availability zone and instance type to run on, minimizing cost and job interruptions. We have deployed a scalable on-demand caching service to deliver code and database information to jobs running on the commercial cloud. It uses the frontiersquid server and CERN VM File System (CVMFS) clients on EC2 instances and utilizes various services provided by AWS to build the infrastructure (stack). We discuss the architecture and load testing benchmarks on the squid servers. We also describe various approaches that were evaluated to transport experimental data to and from the cloud, and the optimal solutions that were used for the bulk of the data transport. Finally, we summarize lessons learned from this scale test, and our future plans to expand and improve the Fermilab HEP Cloud Facility.« less

  14. Lunar Transportation Facilities and Operations Study, option 2

    NASA Technical Reports Server (NTRS)

    1992-01-01

    During the Option 2 period of the Lunar Transportation Facilities and Operations Study (LTFOS), a joint McDonnell Douglas Space Systems Company Kennedy Space Center (MDSSC-KSC) and National Aeronautics and Space Administration Kennedy Space Center (NASA-KSC) Study team conducted a comparison of the functional testing of the RL-10 and Space Shuttle Main Engine, a quick-look impact assessment of the Synthesis Group Report, and a detailed assessment of the Synthesis Group Report. The results of these KSC LTFOS team efforts are included. The most recent study task effort was a detailed assessment of the Synthesis Group Report. The assessment was conducted to determine the impact on planetary launch and landing facilities and operations. The result of that effort is a report entitled 'Analysis of the Synthesis Group Report, its Architectures and their Impacts on PSS Launch and Landing Operations' and is contained in Appendix A. The report is structured in a briefing format with facing pages as opposed to a narrative style. A quick-look assessment of the Synthesis Group Report was conducted to determine the impact of implementing the recommendations of the Synthesis Group on KSC launch facilities and operations. The data was documented in a presentation format as requested by Kennedy Space Center Technology and Advanced Projects Office and is included in Appendix B. Appendix C is a white paper on the comparison of the functional testing of the RL-10 and Space Shuttle Main Engine. The comparison was undertaken to provide insight regarding common test requirements that would be applicable to Lunar and Mars Excursion Vehicles (LEV and MEV).

  15. Multi Canister Overpack (MCO) Topical Report [SEC 1 THRU 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LORENZ, B.D.

    In February 1995, the US Department of Energy (DOE) approved the Spent Nuclear Fuel (SNF) Project's ''Path Forward'' recommendation for resolution of the safety and environmental concerns associated with the deteriorating SNF stored in the Hanford Site's K Basins (Hansen 1995). The recommendation included an aggressive series of projects to design, construct, and operate systems and facilitates to permit the safe retrieval, packaging, transport, conditions, and interim storage of the K Basins' SNF. The facilities are the Cold VAcuum Drying Facility (CVDF) in the 100 K Area of the Hanford Site and the Canister Storage building (CSB) in the 200more » East Area. The K Basins' SNF is to be cleaned, repackaged in multi-canister overpacks (MCOs), removed from the K Basins, and transported to the CVDF for initial drying. The MCOs would then be moved to the CSB and weld sealed (Loscoe 1996) for interim storage (about 40 years). One of the major tasks associated with the initial Path Forward activities is the development and maintenance of the safety documentation. In addition to meeting the construction needs for new structures, the safety documentation for each must be generated.« less

  16. Report of the Task Force on Declining Enrollment. Third Revision.

    ERIC Educational Resources Information Center

    Highline Public Schools, Seattle, WA.

    The purpose of this task force was to study the program, facilities, and alternatives of the Highline School District as they relate to enrollment decline. Specifically, the task force was to establish criteria for identifying facilities where changes should be considered; identify and prioritize alternatives for use of excess classroom space; and…

  17. 33 CFR 154.1216 - Facility classification.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Vegetable Oils Facilities § 154.1216 Facility classification. (a) The Coast Guard classifies facilities that handle, store, or transport animal fats or vegetable oils as “substantial harm” facilities because they... classification of a facility that handles, stores, or transports animal fats or vegetable oils. The COTP may...

  18. 33 CFR 154.1216 - Facility classification.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Vegetable Oils Facilities § 154.1216 Facility classification. (a) The Coast Guard classifies facilities that handle, store, or transport animal fats or vegetable oils as “substantial harm” facilities because they... classification of a facility that handles, stores, or transports animal fats or vegetable oils. The COTP may...

  19. Definition of technology development missions for early space stations orbit transfer vehicle serving. Phase 2, task 1: Space station support of operational OTV servicing

    NASA Technical Reports Server (NTRS)

    1983-01-01

    Representative space based orbital transfer vehicles (OTV), ground based vehicle turnaround assessment, functional operational requirements and facilities, mission turnaround operations, a comparison of ground based versus space based tasks, activation of servicing facilities prior to IOC, fleet operations requirements, maintenance facilities, OTV servicing facilities, space station support requirements, and packaging for delivery are discussed.

  20. 33 CFR 154.1325 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... evaluation criteria for facilities that handle, store, or transport other non-petroleum oils. 154.1325...) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Other Non-Petroleum..., store, or transport other non-petroleum oils. (a) An owner or operator of a facility that handles...

  1. 33 CFR 154.1325 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... evaluation criteria for facilities that handle, store, or transport other non-petroleum oils. 154.1325...) POLLUTION FACILITIES TRANSFERRING OIL OR HAZARDOUS MATERIAL IN BULK Response Plans for Other Non-Petroleum..., store, or transport other non-petroleum oils. (a) An owner or operator of a facility that handles...

  2. National facilities study. Volume 5: Space research and development facilities task group

    NASA Technical Reports Server (NTRS)

    1994-01-01

    With the beginnings of the U.S. space program, there was a pressing need to develop facilities that could support the technology research and development, testing, and operations of evolving space systems. Redundancy in facilities that was once and advantage in providing flexibility and schedule accommodation is instead fast becoming a burden on scarce resources. As a result, there is a clear perception in many sectors that the U.S. has many space R&D facilities that are under-utilized and which are no longer cost-effective to maintain. At the same time, it is clear that the U.S. continues to possess many space R&D facilities which are the best -- or among the best -- in the world. In order to remain world class in key areas, careful assessment of current capabilities and planning for new facilities is needed. The National Facility Study (NFS) was initiated in 1992 to develop a comprehensive and integrated long-term plan for future aerospace facilities that meets current and projected government and commercial needs. In order to assess the nation's capability to support space research and development (R&D), a Space R&D Task Group was formed. The Task Group was co-chaired by NASA and DOD. The Task Group formed four major, technologically- and functionally- oriented working groups: Human and Machine Operations; Information and Communications; Propulsion and Power; and Materials, Structures, and Flight Dynamics. In addition to these groups, three supporting working groups were formed: Systems Engineering and Requirements; Strategy and Policy; and Costing Analysis. The Space R&D Task Group examined several hundred facilities against the template of a baseline mission and requirements model (developed in common with the Space Operations Task Group) and a set of excursions from the baseline. The model and excursions are described in Volume 3 of the NFS final report. In addition, as a part of the effort, the group examined key strategic issues associated with space R&D facilities planning for the U.S., and these are discussed in Section 4 of this volume.

  3. 49 CFR 599.201 - Identification of salvage auctions and disposal facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... facilities. 599.201 Section 599.201 Transportation Other Regulations Relating to Transportation (Continued... and Disposal Facilities § 599.201 Identification of salvage auctions and disposal facilities. (a... disposal facility identified in paragraph (a)(2) or (a)(3) of this section. (2) A disposal facility listed...

  4. Report of the Task Force on SSC Magnet System Test Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1984-10-01

    The Task Force on SSC Magnet Systems test Site was appointed by Maury Tigner, Director of the SSC, Phase 1 in August 1984. In brief, the charge asked the Task Force to make a critical evaluation of potential test sites for a major SSC magnet System Test Facility (STF) with regard to: (1) availability of the needed space, utilities, staff and other requirements on the desired time scale; and (2) the cost of preparing the sites for the tests and for operating the facilities during the test period. The charge further suggests that, by virtue of existing facilities and availabilitymore » of experienced staff, BNL and FNAL are the two best candidate sites and that is therefore appears appropriate to restrict the considerations of the Task Force to these sites. During the subsequent deliberations of the Task Force, no new facts were revealed that altered the assumptions of the charge in this regard. The charge does not ask for a specific site recommendation for the STF. Indeed, an agreement on such a recommendation would be difficult to achieve considering the composition of the Task Force, wherein a large fraction of the membership is drawn from the two contending laboratories. Instead, we have attempted to describe the purpose of the facility, outline a productive test program, list the major facilities required, carefully review the laboratories` responses to the facility requirements, and make objective comparisons of the specific features and capabilities offered.« less

  5. MPLM Donatello is offloaded at the SLF

    NASA Technical Reports Server (NTRS)

    2001-01-01

    At the Shuttle Landing Facility, workers in cherry pickers (right) help guide offloading of the Italian Space Agency's Multi-Purpose Logistics Module Donatello from the Airbus '''Beluga''' air cargo plane that brought it from the factory of Alenia Aerospazio in Turin, Italy. The third of three for the International Space Station, the module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.

  6. 23 CFR 500.101 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... safety (SMS), traffic congestion (CMS), public transportation facilities and equipment (PTMS), and..., and implementation of a traffic monitoring system for highways and public transportation facilities... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT MANAGEMENT...

  7. 49 CFR 195.426 - Scraper and sphere facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Scraper and sphere facilities. 195.426 Section 195.426 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS... HAZARDOUS LIQUIDS BY PIPELINE Operation and Maintenance § 195.426 Scraper and sphere facilities. No operator...

  8. Aviation and Airports, Transportation & Public Facilities, State of Alaska

    Science.gov Websites

    State Employees Alaska Department of Transportation & Public Facilities header image Alaska Department of Transportation & Public Facilities / Aviation and Airports Search DOT&PF State of Stevens Anchorage International Airport Link to List of Alaska Public Airports Ketchikan International

  9. Space Transportation and Destination Facilities

    NASA Technical Reports Server (NTRS)

    Smitherman, David; McClure, Wallace

    1999-01-01

    The Space Transportation and Destination Facilities section focused on space transportation vehicles-from use of existing vehicles to development of specialized transports-and on space stations, space business parks, space hotels, and other facilities in space of the kind that eventually would provide services for general public space travel (PST) and tourism. For both transportation and destination facilities, the emphasis was on the identification of various strategies to enable a realistic incremental progression in the development and acquisition of such facilities, and the identification of issues that need resolution to enable formation of viable businesses. The approach was to determine the best: (1) Strategies for general PST and tourism development through the description and analysis of a wide range of possible future scenarios. With these scenarios in mind the section then identified. (2) Key issues to be explored. (3) opportunities to eliminate barriers. (4) Recommendations for future actions. (5) Top-level requirements and characteristics for general PST and tourism systems and services that would guide the development of transportation and destination facilities.

  10. NASA AETC Test Technology Subproject

    NASA Technical Reports Server (NTRS)

    Bell, James

    2017-01-01

    Funds directed to improve measurement capabilities (pressure, force, flow, and temperature), test techniques and processes, and develop technologies critical to meeting NASA research needs and applicable to a multitude of facilities. Primarily works by funding small ($40K - $400K) tasks which result in a demonstration or initial capability of a new technology in an AETC facility.TT research and development tasks are generally TRL 3-6; they should be things which work in small scale or lab environments but need further development for use in production facilities.TT differs from CA in its focus on smaller-scale tasks and on instrumentation. Technologies developed by TT may become CA projects in order be fully realized within a facility.

  11. Report of the Governor's Blue Ribbon Transportation Task Force

    DOT National Transportation Integrated Search

    1982-12-01

    Governor Ray appointed the Blue Ribbon Transportation Task Force to provide guidance concerning specific steps that can be taken to: achieve maximum efficiency in the utilization of transportation resources; preserve essential transportation services...

  12. 49 CFR 1580.111 - Harmonization of federal regulation of nuclear facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 9 2014-10-01 2014-10-01 false Harmonization of federal regulation of nuclear facilities. 1580.111 Section 1580.111 Transportation Other Regulations Relating to Transportation (Continued... regulation of nuclear facilities. TSA will coordinate activities under this subpart with the Nuclear...

  13. 49 CFR 1580.111 - Harmonization of federal regulation of nuclear facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 9 2011-10-01 2011-10-01 false Harmonization of federal regulation of nuclear facilities. 1580.111 Section 1580.111 Transportation Other Regulations Relating to Transportation (Continued... regulation of nuclear facilities. TSA will coordinate activities under this subpart with the Nuclear...

  14. 49 CFR 1580.111 - Harmonization of federal regulation of nuclear facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 9 2013-10-01 2013-10-01 false Harmonization of federal regulation of nuclear facilities. 1580.111 Section 1580.111 Transportation Other Regulations Relating to Transportation (Continued... regulation of nuclear facilities. TSA will coordinate activities under this subpart with the Nuclear...

  15. 49 CFR 1580.111 - Harmonization of federal regulation of nuclear facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 9 2010-10-01 2010-10-01 false Harmonization of federal regulation of nuclear facilities. 1580.111 Section 1580.111 Transportation Other Regulations Relating to Transportation (Continued... regulation of nuclear facilities. TSA will coordinate activities under this subpart with the Nuclear...

  16. 49 CFR 1580.111 - Harmonization of federal regulation of nuclear facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 9 2012-10-01 2012-10-01 false Harmonization of federal regulation of nuclear facilities. 1580.111 Section 1580.111 Transportation Other Regulations Relating to Transportation (Continued... regulation of nuclear facilities. TSA will coordinate activities under this subpart with the Nuclear...

  17. 25 CFR 170.800 - Who owns IRR transportation facilities?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Who owns IRR transportation facilities? 170.800 Section 170.800 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.800 Who owns IRR transportation facilities? Public authorities...

  18. 78 FR 24438 - Evaluations of Explosions Postulated To Occur at Nearby Facilities and on Transportation Routes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... Nearby Facilities and on Transportation Routes Near Nuclear Power Plants AGENCY: Nuclear Regulatory... Nearby Facilities and on Transportation Routes Near Nuclear Power Plants.'' This regulatory guide describes for applicants seeking nuclear power reactor licenses and licensees of nuclear power reactors...

  19. The Washington State Task Force on Student Transportation Safety. Final Report.

    ERIC Educational Resources Information Center

    Washington State Legislature, Olympia.

    Findings of a study conducted by the Washington State Task Force on Student Transportation Safety are presented in this report. The data-collection process involved four phases: meetings with experts in student transportation and pedestrian safety; public meetings, informational work sessions, and tours of problems areas; task force meetings; and…

  20. Alternative Techniques for Testing A Highway Information Systems

    NASA Technical Reports Server (NTRS)

    Mast, Truman; Mast, Truman

    1974-01-01

    The highway transport system as contrasted with other modes of transportation is quite unique in that the users of the system are responsible for the guidance and control functions of the vehicle. Research has shown that improved forms of motorist information, such as highway signs and markings, can enhance the predictability and reliability of the driving task. Test and evaluation of promising new concepts in motorist information must preceed widespread endorsement and implementation on our highway system. This paper reviews the merits and limitations of presently available human factor research techniques--laboratory, instrumented vehicle and traffic performance studies on operational facilities--for evaluating the efficacy of motorist information concepts. Specific examples are given to demonstrate the utility and the interrelationships of the alternative research techniques and there is a discussion of the most pressing immediate and future needs for improved highway signing and road marking research methodology.

  1. Transportation and general aviation in Virginia

    NASA Technical Reports Server (NTRS)

    1975-01-01

    The diversity of Virginia is examined with respect to its transportation facilities and services, the Virginia Air Transportation System Plan, regionalism, and selected case studies of individual facilities.

  2. Crystal Growth of ZnSe and Related Ternary Compound Semiconductors by Physical Vapor Transport

    NASA Technical Reports Server (NTRS)

    Cushman, Paula P.

    1997-01-01

    Preliminary definition of all of the necessary materials, labor, services, and facilities necessary to provide science requirement definition, initiate hardware development activities, and provide an update flight program proposal consistent with the NRA selection letter. The major tasks identified in this SOW are in the general category of science requirements determination, instrument definition, and updated flight program proposal. The Contractor shall define preliminary management, technical and integration requirements for the program, including improved cost/schedule estimates. The Contractor shall identify new technology requirements, define experiment accommodations and operational requirements and negotiate procurement of any long lead items, if required, with the government.

  3. Crystal Growth of ZnSe and Related Ternary Compound Semiconductors by Physical Vapor Transport

    NASA Technical Reports Server (NTRS)

    Su, Ching-Hua

    1997-01-01

    Preliminary definition of all of the necessary materials, labor, services, and facilities necessary to provide science requirement definition, initiate hardware development activities, and provide an updated flight program proposal consistent with the NRA selection letter. The major tasks identified in this SOW are in the general category of science requirements determination, instrument definition, and updated flight program proposal. The Contractor shall define preliminary management, technical and integration requirements for the program, including improved cost/schedule estimates. The Contractor shall identify new technology requirements, define experiment accommodations and operational requirements and negotiate procurement of any long lead items, if required, with the government.

  4. 49 CFR 27.71 - Airport facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Airport facilities. 27.71 Section 27.71... Administration Programs: Airports, Railroads, and Highways § 27.71 Airport facilities. (a) This section applies... financial assistance at a commercial service airport, including parking and ground transportation facilities...

  5. 49 CFR 27.71 - Airport facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 1 2012-10-01 2012-10-01 false Airport facilities. 27.71 Section 27.71... Administration Programs: Airports, Railroads, and Highways § 27.71 Airport facilities. (a) This section applies... financial assistance at a commercial service airport, including parking and ground transportation facilities...

  6. 49 CFR 27.71 - Airport facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 1 2013-10-01 2013-10-01 false Airport facilities. 27.71 Section 27.71... Administration Programs: Airports, Railroads, and Highways § 27.71 Airport facilities. (a) This section applies... financial assistance at a commercial service airport, including parking and ground transportation facilities...

  7. 49 CFR 193.2001 - Scope of part.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES... LNG facilities used in the transportation of gas by pipeline that is subject to the pipeline safety...

  8. Women's preferences for obstetric care in rural Ethiopia: a population-based discrete choice experiment in a region with low rates of facility delivery.

    PubMed

    Kruk, M E; Paczkowski, M M; Tegegn, A; Tessema, F; Hadley, C; Asefa, M; Galea, S

    2010-11-01

    Delivery attended by skilled professionals is essential to reducing maternal mortality. Although the facility delivery rate in Ethiopia's rural areas is extremely low, little is known about which health system characteristics most influence women's preferences for delivery services. In this study, women's preferences for attributes of health facilities for delivery in rural Ethiopia were investigated. A population-based discrete choice experiment (DCE) was fielded in Gilgel Gibe, in southwest Ethiopia, among women with a delivery in the past 5 years. Women were asked to select a hypothetical health facility for future delivery from two facilities on a picture card. A hierarchical Bayesian procedure was used to estimate utilities associated with facility attributes: distance, type of provider, provider attitude, drugs and medical equipment, transport and cost. 1006 women completed 8045 DCE choice tasks. Among them, 93.8% had delivered their last child at home. The attributes with the greatest influence on the overall utility of a health facility for delivery were availability of drugs and equipment (mean β=3.9, p<0.01), seeing a doctor versus a health extension worker (mean β=2.1, p<0.01) and a receptive provider attitude (mean β=1.4, p<0.01). Women in rural southwest Ethiopia who have limited personal experience with facility delivery nonetheless value health facility attributes that indicate high technical quality: availability of drugs and equipment and physician providers. Well-designed policy experiments that measure the contribution of quality improvements to facility delivery rates in Ethiopia and other countries with low health service utilisation and high maternal mortality may inform national efforts to reduce maternal mortality.

  9. 25 CFR 170.807 - What must BIA include when it develops an IRR Transportation Facilities Maintenance Management...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Transportation Facilities Maintenance Management System? 170.807 Section 170.807 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.807 What must BIA include when it develops an IRR Transportation Facilities Maintenance Management System...

  10. 49 CFR 1155.10 - Contents of petition.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 8 2012-10-01 2012-10-01 false Contents of petition. 1155.10 Section 1155.10 Transportation Other Regulations Relating to Transportation (Continued) SURFACE TRANSPORTATION BOARD, DEPARTMENT OF TRANSPORTATION RULES OF PRACTICE SOLID WASTE RAIL TRANSFER FACILITIES Procedures Governing Petitions To Require a Facility in Existence o...

  11. 49 CFR 1155.10 - Contents of petition.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 8 2013-10-01 2013-10-01 false Contents of petition. 1155.10 Section 1155.10 Transportation Other Regulations Relating to Transportation (Continued) SURFACE TRANSPORTATION BOARD, DEPARTMENT OF TRANSPORTATION RULES OF PRACTICE SOLID WASTE RAIL TRANSFER FACILITIES Procedures Governing Petitions To Require a Facility in Existence o...

  12. 49 CFR 807.150 - Program accessibility: Existing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Program accessibility: Existing facilities. 807... CONDUCTED BY THE NATIONAL TRANSPORTATION SAFETY BOARD § 807.150 Program accessibility: Existing facilities... not— (1) Necessarily require the agency to make each of its existing facilities accessible to and...

  13. Racial disparities in travel time to radiotherapy facilities in the Atlanta metropolitan area

    PubMed Central

    Peipins, Lucy A.; Graham, Shannon; Young, Randall; Lewis, Brian; Flanagan, Barry

    2018-01-01

    Low-income women with breast cancer who rely on public transportation may have difficulty in completing recommended radiation therapy due to inadequate access to radiation facilities. Using a geographic information system (GIS) and network analysis we quantified spatial accessibility to radiation treatment facilities in the Atlanta, Georgia metropolitan area. We built a transportation network model that included all bus and rail routes and stops, system transfers and walk and wait times experienced by public transportation system travelers. We also built a private transportation network to model travel times by automobile. We calculated travel times to radiation therapy facilities via public and private transportation from a population-weighted center of each census tract located within the study area. We broadly grouped the tracts by low, medium and high household access to a private vehicle and by race. Facility service areas were created using the network model to map the extent of areal coverage at specified travel times (30, 45 and 60 min) for both public and private modes of transportation. The median public transportation travel time to the nearest radiotherapy facility was 56 min vs. approximately 8 min by private vehicle. We found that majority black census tracts had longer public transportation travel times than white tracts across all categories of vehicle access and that 39% of women in the study area had longer than 1 h of public transportation travel time to the nearest facility. In addition, service area analyses identified locations where the travel time barriers are the greatest. Spatial inaccessibility, especially for women who must use public transportation, is one of the barriers they face in receiving optimal treatment. PMID:23726213

  14. Racial disparities in travel time to radiotherapy facilities in the Atlanta metropolitan area.

    PubMed

    Peipins, Lucy A; Graham, Shannon; Young, Randall; Lewis, Brian; Flanagan, Barry

    2013-07-01

    Low-income women with breast cancer who rely on public transportation may have difficulty in completing recommended radiation therapy due to inadequate access to radiation facilities. Using a geographic information system (GIS) and network analysis we quantified spatial accessibility to radiation treatment facilities in the Atlanta, Georgia metropolitan area. We built a transportation network model that included all bus and rail routes and stops, system transfers and walk and wait times experienced by public transportation system travelers. We also built a private transportation network to model travel times by automobile. We calculated travel times to radiation therapy facilities via public and private transportation from a population-weighted center of each census tract located within the study area. We broadly grouped the tracts by low, medium and high household access to a private vehicle and by race. Facility service areas were created using the network model to map the extent of areal coverage at specified travel times (30, 45 and 60 min) for both public and private modes of transportation. The median public transportation travel time to the nearest radiotherapy facility was 56 min vs. approximately 8 min by private vehicle. We found that majority black census tracts had longer public transportation travel times than white tracts across all categories of vehicle access and that 39% of women in the study area had longer than 1 h of public transportation travel time to the nearest facility. In addition, service area analyses identified locations where the travel time barriers are the greatest. Spatial inaccessibility, especially for women who must use public transportation, is one of the barriers they face in receiving optimal treatment. Published by Elsevier Ltd.

  15. Fluidized-bed copper oxide process. Phase IV. Conceptual design and economic evaluation, Volume I. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1994-11-30

    Universal Oil Products, Inc. (UOP) of Des Plaines, Illinois has contracted A.E. Roberts & Associates, Inc. (AERA) of Atlanta, Georgia to prepare a sensitivity analysis for the development of the Fluidized-bed Copper Oxide (FBCO) process. As proposed by AERA in September 1991, development of the FBCO process design for a 500 mega-watt (MW) unit was divided into three tasks: (1) Establishment of a Conceptual Design, (2) Conceptual Design, (3) Cost Analysis Task 1 determined the basis for a conceptual design for the 500 megawatt (MW) FBCO process. It was completed by AERA in September of 1992, and a report wasmore » submitted at that time {open_quotes}Establishment of the Design Basis for Application to a 500 MW Coal-fired Facility.{close_quotes} Task 2 gathered all pertinent data available to date and reviewed its applicability to the 500 MW FBCO process. Work on this task was carried out on a joint basis by the AERA team members: Roberts & Schaefers worked on the dense phase transport aspect of the design; Cornell and Carnegie Mellon Universities worked on the design kinetics and modeling; and AERA contributed commercial power and combustion experience. Task 3 provides budgetary cost estimates for the FBCO process and competing alternative technologies for sulfur dioxide and nitrogen oxide removal.« less

  16. 49 CFR Appendix E to Part 599 - Disposal Facility Certification Form

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Disposal Facility Certification Form E Appendix E to Part 599 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY... Facility Certification Form ER05AU09.020 ER05AU09.021 ER05AU09.022 [74 FR 38976, Aug. 5, 2009] ...

  17. 41 CFR 102-34.210 - May I use a Government motor vehicle for transportation between places of employment and mass...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... motor vehicle for transportation between places of employment and mass transit facilities? 102-34.210... of employment and mass transit facilities? Yes, you may use a Government motor vehicle for transportation between places of employment and mass transit facilities under the following conditions: (a) The...

  18. Application of the finite element groundwater model FEWA to the engineered test facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Craig, P.M.; Davis, E.C.

    1985-09-01

    A finite element model for water transport through porous media (FEWA) has been applied to the unconfined aquifer at the Oak Ridge National Laboratory Solid Waste Storage Area 6 Engineered Test Facility (ETF). The model was developed in 1983 as part of the Shallow Land Burial Technology - Humid Task (ONL-WL14) and was previously verified using several general hydrologic problems for which an analytic solution exists. Model application and calibration, as described in this report, consisted of modeling the ETF water table for three specialized cases: a one-dimensional steady-state simulation, a one-dimensional transient simulation, and a two-dimensional transient simulation. Inmore » the one-dimensional steady-state simulation, the FEWA output accurately predicted the water table during a long period in which there were no man-induced or natural perturbations to the system. The input parameters of most importance for this case were hydraulic conductivity and aquifer bottom elevation. In the two transient cases, the FEWA output has matched observed water table responses to a single rainfall event occurring in February 1983, yielding a calibrated finite element model that is useful for further study of additional precipitation events as well as contaminant transport at the experimental site.« less

  19. 77 FR 40891 - Towing Safety Advisory Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-11

    ... ``Recommendations for Safety Standards of Portable Facility Vapor Control Systems.'' (4) Period for public comment... teleconference to review and discuss a new Task Statement titled ``Recommendations for Safety Standards of Portable Facility Vapor Control Systems'' and to discuss the progress of open Task Statements. This meeting...

  20. 25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible for maintenance under the BIA Road Maintenance Program: (1) BIA transportation facilities listed in...

  1. 49 CFR 193.2005 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES..., design, installation, or construction of LNG facilities (including material incorporated by reference in...

  2. Facility Upgrade/Replacement Tasks ('planned') at the NASA Glenn Research Center 10x10 Supersonic Wind Tunnel

    NASA Technical Reports Server (NTRS)

    Giriunas, Julius A.

    2012-01-01

    Facility upgrades and large maintenance tasks needed at the NASA Glenn 10x10 Supersonic Wind Tunnel requires significant planning to make sure implementation proceeds in an efficiently and cost effective manner. Advanced planning to secure the funding, complete design efforts and schedule the installation needs to be thought out years in advance to avoid interference with wind tunnel testing. This presentation describes five facility tasks planned for implementation over the next few years. The main focus of the presentation highlights the efforts on possible replacement of the diesel generator and the rationale behind the effort.

  3. 33 CFR 154.1047 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... evaluation criteria for facilities that handle, store, or transport Group V petroleum oils. 154.1047 Section... Group V petroleum oils. (a) An owner or operator of a facility that handles, stores, or transports Group...) Procedures and strategies for responding to a worst case discharge of Group V petroleum oils to the maximum...

  4. 33 CFR 154.1047 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... evaluation criteria for facilities that handle, store, or transport Group V petroleum oils. 154.1047 Section... Group V petroleum oils. (a) An owner or operator of a facility that handles, stores, or transports Group...) Procedures and strategies for responding to a worst case discharge of Group V petroleum oils to the maximum...

  5. 33 CFR 154.1047 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... evaluation criteria for facilities that handle, store, or transport Group V petroleum oils. 154.1047 Section... Group V petroleum oils. (a) An owner or operator of a facility that handles, stores, or transports Group...) Procedures and strategies for responding to a worst case discharge of Group V petroleum oils to the maximum...

  6. 33 CFR 154.1047 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... evaluation criteria for facilities that handle, store, or transport Group V petroleum oils. 154.1047 Section... Group V petroleum oils. (a) An owner or operator of a facility that handles, stores, or transports Group...) Procedures and strategies for responding to a worst case discharge of Group V petroleum oils to the maximum...

  7. 33 CFR 154.1047 - Response plan development and evaluation criteria for facilities that handle, store, or transport...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... evaluation criteria for facilities that handle, store, or transport Group V petroleum oils. 154.1047 Section... Group V petroleum oils. (a) An owner or operator of a facility that handles, stores, or transports Group...) Procedures and strategies for responding to a worst case discharge of Group V petroleum oils to the maximum...

  8. Facility Maintenance. V-TECS Guide.

    ERIC Educational Resources Information Center

    Moore, Charles G.; And Others

    This facility maintenance guide is a compilation of duties, tasks, performance objectives, and performance guides that deals with the psychomotor aspect of an occupation. The guide addresses the three domains of learning: psychomotor, cognitive, and affective. Each unit provides job-relevant tasks, standards of performance, source of standard,…

  9. Transportation Infrastructure Robustness : Joint Engineering and Economic Analysis

    DOT National Transportation Integrated Search

    2017-11-01

    The objectives of this study are to develop a methodology for assessing the robustness of transportation infrastructure facilities and assess the effect of damage to such facilities on travel demand and the facilities users welfare. The robustness...

  10. System analysis study of space platform and station accommodations for life sciences research facilities. Volume 2: Study results. Appendix E: Work breakdown structure and dictionary

    NASA Technical Reports Server (NTRS)

    Wiley, Lowell F.

    1985-01-01

    A work breakdown structure for the Space Station Life Sciences Research Facility (LSRF) is presented up to level 5. The purpose is to provide the framework for task planning and control and to serve as a basis for budgeting, task assignment, cost collection and report, and contractual performance measurement and tracking of the Full Scale Development Phase tasks.

  11. 76 FR 50289 - Notice of Funding Availability for the Department of Transportation's National Infrastructure...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-12

    ..., 2011, at 5 p.m. EDT (the ``Application Deadline''). The DOT pre-application system will open on or... systems, and projects that connect transportation facilities to other modes of transportation; and (2... existing transportation facilities and systems, with particular emphasis on projects that minimize life...

  12. Decision support tool to assess importance of transportation facilities.

    DOT National Transportation Integrated Search

    2008-01-01

    Assessing the importance of transportation facilities is an increasingly growing topic of interest to federal and state transportation agencies. This work proposes an optimization based model that uses concepts and techniques of complex networks scie...

  13. Using mobile distributed pyrolysis facilities to deliver a forest residue resource for bio-fuel production

    NASA Astrophysics Data System (ADS)

    Brown, Duncan

    Distributed mobile conversion facilities using either fast pyrolysis or torrefaction processes can be used to convert forest residues to more energy dense substances (bio-oil, bio-slurry or torrefied wood) that can be transported as feedstock for bio-fuel facilities. All feedstock are suited for gasification, which produces syngas that can be used to synthesise petrol or diesel via Fischer-Tropsch reactions, or produce hydrogen via water gas shift reactions. Alternatively, the bio-oil product of fast pyrolysis may be upgraded to produce petrol and diesel, or can undergo steam reformation to produce hydrogen. Implementing a network of mobile facilities reduces the energy content of forest residues delivered to a bio-fuel facility as mobile facilities use a fraction of the biomass energy content to meet thermal or electrical demands. The total energy delivered by bio-oil, bio-slurry and torrefied wood is 45%, 65% and 87% of the initial forest residue energy content, respectively. However, implementing mobile facilities is economically feasible when large transport distances are required. For an annual harvest of 1.717 million m3 (equivalent to 2000 ODTPD), transport costs are reduced to less than 40% of the total levelised delivered feedstock cost when mobile facilities are implemented; transport costs account for up to 80% of feedstock costs for conventional woodchip delivery. Torrefaction provides the lowest cost pathway of delivering a forest residue resource when using mobile facilities. Cost savings occur against woodchip delivery for annual forest residue harvests above 2.25 million m3 or when transport distances greater than 250 km are required. Important parameters that influence levelised delivered costs of feedstock are transport distances (forest residue spatial density), haul cost factors, thermal and electrical demands of mobile facilities, and initial moisture content of forest residues. Relocating mobile facilities can be optimised for lowest cost delivery as transport distances of raw biomass are reduced. The overall cost of bio-fuel production is determined by the feedstock delivery pathway and also the bio-fuel production process employed. Results show that the minimum cost of petrol and diesel production is 0.86 litre -1 when a bio-oil feedstock is upgraded. This corresponds to a 2750 TPD upgrading facility requiring an annual harvest of 4.30 million m3. The miniμm cost of hydrogen production is 2.92 kg -1, via the gasification of a woodchip feedstock and subsequent water gas shift reactions. This corresponds to a 1100 ODTPD facility and requires an annual harvest of 947,000 m3. The levelised cost of bio-fuel strongly depends on the size of annual harvest required for bio-fuel facilities. There are optimal harvest volumes (bio-fuel facility sizes) for each bio-fuel production route, which yield minimum bio-fuel production costs. These occur as the benefits of economies of scale for larger bio-fuel facilities compete against increasing transport costs for larger harvests. Optimal harvest volumes are larger for bio-fuel production routes that use feedstock sourced from mobile facilities, as mobile facilities reduce total transport requirements.

  14. A robotically constructed production and supply base on Phobos

    NASA Astrophysics Data System (ADS)

    1989-05-01

    PHOBIA Corporation is involved with the design of a man-tenable robotically constructed, bootstrap base on Mars' moon, Phobos. This base will be a pit-stop for future manned missions to Mars and beyond and will be a control facility during the robotic construction of a Martian base. An introduction is given to the concepts and the ground rules followed during the design process. Details of a base design and its location are given along with information about some of the subsystems. Since a major purpose of the base is to supply fuel to spacecraft so they can limit their fuel mass, mining and production systems are discussed. Surface support activities such as docks, anchors, and surface transportation systems are detailed. Several power supplies for the base are investigated and include fuel cells and a nuclear reactor. Tasks for the robots are defined along with descriptions of the robots capable of completing the tasks. Finally, failure modes for the entire PHOBIA Corporation design are presented along with an effects analysis and preventative recommendations.

  15. A robotically constructed production and supply base on Phobos

    NASA Technical Reports Server (NTRS)

    1989-01-01

    PHOBIA Corporation is involved with the design of a man-tenable robotically constructed, bootstrap base on Mars' moon, Phobos. This base will be a pit-stop for future manned missions to Mars and beyond and will be a control facility during the robotic construction of a Martian base. An introduction is given to the concepts and the ground rules followed during the design process. Details of a base design and its location are given along with information about some of the subsystems. Since a major purpose of the base is to supply fuel to spacecraft so they can limit their fuel mass, mining and production systems are discussed. Surface support activities such as docks, anchors, and surface transportation systems are detailed. Several power supplies for the base are investigated and include fuel cells and a nuclear reactor. Tasks for the robots are defined along with descriptions of the robots capable of completing the tasks. Finally, failure modes for the entire PHOBIA Corporation design are presented along with an effects analysis and preventative recommendations.

  16. Exploration of an oculometer-based model of pilot workload

    NASA Technical Reports Server (NTRS)

    Krebs, M. J.; Wingert, J. W.; Cunningham, T.

    1977-01-01

    Potential relationships between eye behavior and pilot workload are discussed. A Honeywell Mark IIA oculometer was used to obtain the eye data in a fixed base transport aircraft simulation facility. The data were analyzed to determine those parameters of eye behavior which were related to changes in level of task difficulty of the simulated manual approach and landing on instruments. A number of trends and relationships between eye variables and pilot ratings were found. A preliminary equation was written based on the results of a stepwise linear regression. High variability in time spent on various instruments was related to differences in scanning strategy among pilots. A more detailed analysis of individual runs by individual pilots was performed to investigate the source of this variability more closely. Results indicated a high degree of intra-pilot variability in instrument scanning. No consistent workload related trends were found. Pupil diameter which had demonstrated a strong relationship to task difficulty was extensively re-exmained.

  17. EVA Development and Verification Testing at NASA's Neutral Buoyancy Laboratory

    NASA Technical Reports Server (NTRS)

    Jairala, Juniper C.; Durkin, Robert; Marak, Ralph J.; Sipila, Stepahnie A.; Ney, Zane A.; Parazynski, Scott E.; Thomason, Arthur H.

    2012-01-01

    As an early step in the preparation for future Extravehicular Activities (EVAs), astronauts perform neutral buoyancy testing to develop and verify EVA hardware and operations. Neutral buoyancy demonstrations at NASA Johnson Space Center's Sonny Carter Training Facility to date have primarily evaluated assembly and maintenance tasks associated with several elements of the International Space Station (ISS). With the retirement of the Shuttle, completion of ISS assembly, and introduction of commercial players for human transportation to space, evaluations at the Neutral Buoyancy Laboratory (NBL) will take on a new focus. Test objectives are selected for their criticality, lack of previous testing, or design changes that justify retesting. Assembly tasks investigated are performed using procedures developed by the flight hardware providers and the Mission Operations Directorate (MOD). Orbital Replacement Unit (ORU) maintenance tasks are performed using a more systematic set of procedures, EVA Concept of Operations for the International Space Station (JSC-33408), also developed by the MOD. This paper describes the requirements and process for performing a neutral buoyancy test, including typical hardware and support equipment requirements, personnel and administrative resource requirements, examples of ISS systems and operations that are evaluated, and typical operational objectives that are evaluated.

  18. Preparation for Testing, Safe Packing and Shipping of Spent Nuclear Fuel from IFIN-HH, Bucharest-Magurele to Russian Federation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dragolici, C.A.; Zorliu, A.; Popa, V.

    2007-07-01

    The Russian Research Reactor Fuel Return (RRRFR) program is promoted by IAEA and DOE in order to repatriate of irradiated research reactor fuel originally supplied by Russia to facilities outside the country. Developed under the framework of the Global Threat Reduction Initiative (GTRI) the take-back program [1] common goal is to reduce both proliferation and security risks by eliminating or consolidating inventories of high-risk material. The main objective of this program is to support the return to Russian Federation of fresh or irradiated HEU and LEU fuel. Being part of this project, Romania is fulfilling its tasks by examining transportmore » and transfer cask options, assessment of transport routes, and providing cost estimates for required equipment and facility modifications. Spent Nuclear Fuel (SNF) testing, handling, packing and shipping are the most common interests on which the National Institute of Research and Development for Physics and Nuclear Engineering 'Horia Hulubei' (IFIN-HH) is focusing at the moment. (authors)« less

  19. Progress toward the development and testing of source reconstruction methods for NIF neutron imaging.

    PubMed

    Loomis, E N; Grim, G P; Wilde, C; Wilson, D C; Morgan, G; Wilke, M; Tregillis, I; Merrill, F; Clark, D; Finch, J; Fittinghoff, D; Bower, D

    2010-10-01

    Development of analysis techniques for neutron imaging at the National Ignition Facility is an important and difficult task for the detailed understanding of high-neutron yield inertial confinement fusion implosions. Once developed, these methods must provide accurate images of the hot and cold fuels so that information about the implosion, such as symmetry and areal density, can be extracted. One method under development involves the numerical inversion of the pinhole image using knowledge of neutron transport through the pinhole aperture from Monte Carlo simulations. In this article we present results of source reconstructions based on simulated images that test the methods effectiveness with regard to pinhole misalignment.

  20. Feasibility of a Fieldable Mass Spectrometer FY 2015 Year-end Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Barinaga, Charles J.; Hager, George J.; Hoegg, Edward D.

    Currently, the International Atomic Energy Agency (IAEA) monitors the production of enriched uranium hexafluoride (UF 6) at declared facilities by collecting a few grams of product in sample tubes that are then sent to central laboratories for processing and isotope ratio analysis by thermal ionization mass spectrometry. Analysis of results may not be available for some time after collection. In addition, new shipping regulations will make it more difficult to transport this amount of UF 6 to a laboratory. The IAEA is interested in an isotope ratio technique for uranium in UF 6 that can be moved to and operatedmore » at the enrichment facility itself. This report covers the tasks and activities of the Feasibility of a Fieldable Mass Spectrometer Project for FY 2015, which investigates the feasibility of an in-field isotope ratio technique— the forward deployment of a technique to the non-laboratory situation of a protected room with power and heat at the facility of interest. A variety of nontraditional elemental ionization techniques were considered. It was determined that only two of these should be moved forward for testing with the candidate in-field mass spectrometer and with the adsorbed UF 6 sample types.« less

  1. Description of concept and first feasibility test results of a life support subsystem of the Botany Facility based on water reclamation

    NASA Technical Reports Server (NTRS)

    Loeser, H. R.

    1986-01-01

    The Botany Facility allows the growth of higher plants and fungi over a period of 6 months maximum. It is a payload planned for the second flight of the Eureca platform around 1990. Major tasks of the Life Support Subsystem (LSS) of the Botany Facility include the control of the pressure and composition of the atmosphere within the plant/fungi growth chambers, control of the temperature and humidity of the air and the regulation of the soil water content within specified limits. Previous studies have shown that various LSS concepts are feasible ranging from heavy, simple and cheap to light, complex and expensive solutions. A summary of those concepts is given. A new approach to accomplish control of the temperature and humidity of the air within the growth chambers based on water reclamation is discussed. This reclamation is achieved by condensation with a heat pump and capillary transport of the condensate back into the soil of the individual growth chamber. Some analytical estimates are given in order to obtain guidelines for circulation flow rates and to determine the specific power consumption.

  2. 49 CFR 599.401 - Requirements and limitations for disposal facilities that receive trade-in vehicles under the...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Requirements and limitations for disposal facilities that receive trade-in vehicles under the CARS program. 599.401 Section 599.401 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED)...

  3. 49 CFR 599.401 - Requirements and limitations for disposal facilities that receive trade-in vehicles under the...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Requirements and limitations for disposal facilities that receive trade-in vehicles under the CARS program. 599.401 Section 599.401 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED)...

  4. 49 CFR 599.401 - Requirements and limitations for disposal facilities that receive trade-in vehicles under the...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Requirements and limitations for disposal facilities that receive trade-in vehicles under the CARS program. 599.401 Section 599.401 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED)...

  5. 49 CFR 599.401 - Requirements and limitations for disposal facilities that receive trade-in vehicles under the...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Requirements and limitations for disposal facilities that receive trade-in vehicles under the CARS program. 599.401 Section 599.401 Transportation Other Regulations Relating to Transportation (Continued) NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED)...

  6. Effect of aging on dynamic postural stability and variability during a multi-directional lean and reach object transportation task.

    PubMed

    Huntley, Andrew H; Zettel, John L; Vallis, Lori Ann

    2016-01-01

    A "reach and transport object" task that represents common activities of daily living may provide improved insight into dynamic postural stability and movement variability deficits in older adults compared to previous lean to reach and functional reach tests. Healthy young and older, community dwelling adults performed three same elevation object transport tasks and two multiple elevation object transport tasks under two self-selected speeds, self-paced and fast-paced. Dynamic postural stability and movement variability was quantified by whole-body center of mass motion. Older adults demonstrated significant decrements in frontal plane stability during the multiple elevation tasks while exhibiting the same movement variability as their younger counterparts, regardless of task speed. Interestingly, older adults did not exhibit a tradeoff in maneuverability in favour of maintaining stability throughout the tasks, as has previously been reported. In conclusion, the multi-planar, ecologically relevant tasks employed in the current study were specific enough to elucidate decrements in dynamic stability, and thus may be useful for assessing fall risk in older adults with suspected postural instability. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  7. 75 FR 52054 - Bus and Bus Facilities Discretionary Program Funds

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-24

    ... engaged in public transportation, or private non-profit organizations. FOR FURTHER INFORMATION CONTACT... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Bus and Bus Facilities Discretionary... program announcement of project selections. SUMMARY: The U.S. Department of Transportation's (DOT) Federal...

  8. 23 CFR 810.108 - Designation of existing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ....108 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway... designate existing parking facilities (such as at shopping centers or other public or private locations) for...

  9. Space transportation node - The Atrium Facility

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.

    1990-01-01

    A conceptual design for a space transportation node is presented with a view to the fulfilment of assembly platform support requirements associated with a lunar transportation system. This 'Atrium Facility', which will support lunar base activities before, during, and after the lunar base buildup phase, encompasses a central assembly area surrounded by hangars and workstation platforms; six permanent crewmembers will be supported, as well as four to six transient lunar and Space Shuttle crewmembers. The Atrium Facility dry mass of nearly 320,000 kg excludes cryogenic propellant stowage and the traslunar vehicle envisioned for transportation.

  10. Collaborative Efforts: Developing Clinical Experiences for Nursing Students in Public Sector Settings.

    ERIC Educational Resources Information Center

    Carmichael, Tyra; And Others

    1993-01-01

    The Nurse Academic Collaboration Task Force was formed by the Texas Mental Health and Mental Retardation Commissioner to facilitate linkages between schools of nursing and state facilities, thereby improving the quality of nursing services and assisting in nurse recruitment for state facilities. The task force has identified practice opportunities…

  11. Utilization of a state run public private emergency transportation service exclusively for childbirth: the Janani (maternal) Express program in Madhya Pradesh, India.

    PubMed

    Sidney, Kristi; Ryan, Kayleigh; Diwan, Vishal; De Costa, Ayesha

    2014-01-01

    In 2009 the state government of Madhya Pradesh, India launched an emergency obstetric transportation service, Janani Express Yojana (JEY), to support the cash transfer program that promotes institutional delivery. JEY, a large scale public private partnership, lowers geographical access barriers to facility based care. The state contracts and pays private agencies to provide emergency transportation at no cost to the user. The objective was to study (a) the utilization of JEY among women delivering in health facilities, (b) factors associated with usage, (c) the timeliness of the service. A cross sectional facility based study was conducted in facilities that carried out > ten deliveries a month. Researchers who spent five days in each facility administered a questionnaire to all women who gave birth there to elicit socio-demographic characteristics and transport related details. 35% of women utilised JEY to reach a facility, however utilization varied between study districts. Uptake was highest among women from rural areas (44%), scheduled tribes (55%), and poorly educated women (40%). Living in rural areas and belonging to scheduled tribes were significant predictors for JEY usage. Almost 1/3 of JEY users (n = 104) experienced a transport related delay. The JEY service model complements the cash transfer program by providing transport to a facility to give birth. A study of the distribution of utilization in population subgroups suggests the intervention was successful in reaching the most vulnerable population, promoting equity in access. While 1/3 of women utilized the service and it saved them money; 30% experienced significant transport related delays in reaching a facility, which is comparable to women using public transportation. Further research is needed to understand why utilization is low, to explore if there is a need for service expansion at the community level and to improve the overall time efficiency of JEY.

  12. Public Transport for Everyone: A Summary of the Results of Research and Development Projects Concerning Disabled People and Transport Facilities Supported by the Swedish Transport Research Board. TFB-Report 1989:1.

    ERIC Educational Resources Information Center

    Borjesson, Mats

    This report summarizes the results of research and development concerning disabled individuals in Sweden and their use of transport facilities. The first section, "People with Impaired Mobility and Their Travel Needs," outlines Sweden's transport policy goal to adapt transport to the needs of disabled people, addresses the difficulty in…

  13. Is task-shifting a solution to the health workers' shortage in Northern Ghana?

    PubMed

    Okyere, Eunice; Mwanri, Lillian; Ward, Paul

    2017-01-01

    To explore the experiences and perceptions of health workers and implementers of task-shifting in rural health facilities in Upper East Region, Ghana. Data was collected through field interviews. A total of sixty eight (68) in-depth interviews were conducted with health workers' in primary health care facilities (health centres); Four in-depth interviews with key persons involved in staff management was conducted to understand how task-shifting is organised including its strengths and challenges. The health workers interview guide was designed with the aim of getting data on official tasks of health workers, additional tasks assigned to them, how they perceive these tasks, and the challenges associated with the practice of task-shifting. Task-shifting is a practice being used across the health facilities in the study area to help reduce the impact of insufficient health workers. Generally, health workers had a comprehensive training that supported the organisation of task-shifting. However, staff members' are sometimes engaged in tasks above their level of training and beyond their actual job descriptions. Adequate training is usually not provided before additional tasks are assigned to staff members. Whilst some health workers perceived the additional tasks they performed as an opportunity to learn new skills, others described these as stressful and overburdening. Task-shifting has the potential to contribute to addressing the insufficient health workforce, and thereby improving health delivery system where the procedures are well defined and staff members work in a coordinated and organised manner. The provision of adequate training and supervision for health workers is important in order to improve their expertise before additional tasks are assigned to them so that the quality of care would not be compromised.

  14. Is task-shifting a solution to the health workers’ shortage in Northern Ghana?

    PubMed Central

    Okyere, Eunice; Mwanri, Lillian; Ward, Paul

    2017-01-01

    Objective To explore the experiences and perceptions of health workers and implementers of task-shifting in rural health facilities in Upper East Region, Ghana. Methods Data was collected through field interviews. A total of sixty eight (68) in-depth interviews were conducted with health workers’ in primary health care facilities (health centres); Four in-depth interviews with key persons involved in staff management was conducted to understand how task-shifting is organised including its strengths and challenges. The health workers interview guide was designed with the aim of getting data on official tasks of health workers, additional tasks assigned to them, how they perceive these tasks, and the challenges associated with the practice of task-shifting. Findings Task-shifting is a practice being used across the health facilities in the study area to help reduce the impact of insufficient health workers. Generally, health workers had a comprehensive training that supported the organisation of task-shifting. However, staff members’ are sometimes engaged in tasks above their level of training and beyond their actual job descriptions. Adequate training is usually not provided before additional tasks are assigned to staff members. Whilst some health workers perceived the additional tasks they performed as an opportunity to learn new skills, others described these as stressful and overburdening. Conclusion Task-shifting has the potential to contribute to addressing the insufficient health workforce, and thereby improving health delivery system where the procedures are well defined and staff members work in a coordinated and organised manner. The provision of adequate training and supervision for health workers is important in order to improve their expertise before additional tasks are assigned to them so that the quality of care would not be compromised. PMID:28358841

  15. 49 CFR 25.410 - Comparable facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Transportation Office of the Secretary of Transportation NONDISCRIMINATION ON THE BASIS OF SEX IN EDUCATION PROGRAMS OR ACTIVITIES RECEIVING FEDERAL FINANCIAL ASSISTANCE Discrimination on the Basis of Sex in... toilet, locker room, and shower facilities on the basis of sex, but such facilities provided for students...

  16. A techno-economic analysis of using mobile distributed pyrolysis facilities to deliver a forest residue resource.

    PubMed

    Brown, Duncan; Rowe, Andrew; Wild, Peter

    2013-12-01

    Distributed mobile conversion facilities using either fast pyrolysis or torrefaction processes can be used to convert forest residues to more energy dense substances (bio-oil, bio-slurry or torrefied wood) that can be transported as feedstock for bio-fuel facilities. Results show that the levelised delivered cost of a forest residue resource using mobile facility networks can be lower than using conventional woodchip delivery methods under appropriate conditions. Torrefied wood is the lowest cost pathway of delivering a forest residue resource when using mobile facilities. Cost savings occur against woodchip delivery for annual forest residue harvests above 2.5 million m(3) or when transport distances greater than 300 km are required. Important parameters that influence levelised delivered costs are transport distances (forest residue spatial density), haul cost factors, and initial moisture content of forest residues. Relocating mobile facilities can be optimised for lowest cost delivery as transport distances of raw biomass are reduced. Copyright © 2013 Elsevier Ltd. All rights reserved.

  17. Facilities Guidelines. North Carolina Public Schools.

    ERIC Educational Resources Information Center

    North Carolina State Dept. of Public Instruction, Raleigh.

    The 1986 North Carolina Public School Facilities Standards were legislated in 1996 to become Facility Guidelines. A Public School Facilities Task Force was appointed to review and make revisions. These 1997 guidelines define and describe minimum facilities to ensure educational program appropriateness and long-term cost efficiency. They were…

  18. 75 FR 27857 - Aviation Rulemaking Advisory Committee; Transport Airplane and Engine Issue Area-New Task

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... (autopilot) and performance and handling qualities in icing conditions to improve transport airplane... the existing Avionics Systems Harmonization Working Group. The Task ARAC is initially tasked with... working group will be expected to provide a report that addresses the following low speed alerting...

  19. An automated system for positive reinforcement training of group-housed macaque monkeys at breeding and research facilities.

    PubMed

    Tulip, Jennifer; Zimmermann, Jonas B; Farningham, David; Jackson, Andrew

    2017-06-15

    Behavioural training through positive reinforcement techniques is a well-recognised refinement to laboratory animal welfare. Behavioural neuroscience research requires subjects to be trained to perform repetitions of specific behaviours for food/fluid reward. Some animals fail to perform at a sufficient level, limiting the amount of data that can be collected and increasing the number of animals required for each study. We have implemented automated positive reinforcement training systems (comprising a button press task with variable levels of difficulty using LED cues and a fluid reward) at the breeding facility and research facility, to compare performance across these different settings, to pre-screen animals for selection and refine training protocols. Animals learned 1- and 4-choice button tasks within weeks of home enclosure training, with some inter-individual differences. High performance levels (∼200-300 trials per 60min session at ∼80% correct) were obtained without food or fluid restriction. Moreover, training quickly transferred to a laboratory version of the task. Animals that acquired the task at the breeding facility subsequently performed better both in early home enclosure sessions upon arrival at the research facility, and also in laboratory sessions. Automated systems at the breeding facility may be used to pre-screen animals for suitability for behavioural neuroscience research. In combination with conventional training, both the breeding and research facility systems facilitate acquisition and transference of learning. Automated systems have the potential to refine training protocols and minimise requirements for food/fluid control. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.

  20. Corridor reservation : implications for recouping a portion of the "unearned increment" arising from construction of transportation facilities : final report.

    DOT National Transportation Integrated Search

    1994-01-01

    This report examines the phenomenon of the unearned increment, which is the often substantial increase in private land values resulting from transportation facility construction, and possible attempts to recoup it to finance transportation projects. ...

  1. Efficiency improvement of the investment and innovation activities in the transport facility construction field with public-private partnership involvement

    NASA Astrophysics Data System (ADS)

    Shibayeva, Marina; Serebryakova, Yelena; Shalnev, Oleg

    2017-10-01

    Growing demand to increase the investment volume in modernization and development projects for transport infrastructure define the urgency of the current study. The amount of private sector investments in the field is insufficient to implement the projects for road construction due to their significant capital intensity and long payoff period. The implementation of social significant infrastructure projects on the principles of public-private partnership is one of the key strategic directions of growth for transport facilities. The authors come up with a concept and methodology for modeling the investment and innovation activity in the transport facility construction. Furthermore, there is developed a model to find the balance between public and private sector investments in implementing construction projects for transport infrastructure with involvement of PPP (further - public-private partnership). The suggested concepts aim to improve the efficiency rate of the investment and innovation activity in the field of transport facility construction on the basis of public and private sectors collaboration.

  2. FY 2012 USED FUEL DISPOSITION CAMPAIGN TRANSPORTATION TASK REPORT ON INL EFFORTS SUPPORTING THE MODERATOR EXCLUSION CONCEPT AND STANDARDIZED TRANSPORTATION

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    D. K. Morton

    2012-08-01

    Following the defunding of the Yucca Mountain Project, it is reasonable to assume that commercial used fuel will remain in storage for a longer time period than initially assumed. Previous transportation task work in FY 2011, under the Department of Energy’s Office of Nuclear Energy, Used Fuel Disposition Campaign, proposed an alternative for safely transporting used fuel regardless of the structural integrity of the used fuel, baskets, poisons, or storage canisters after an extended period of storage. This alternative assures criticality safety during transportation by implementing a concept that achieves moderator exclusion (no in-leakage of moderator into the used fuelmore » cavity). By relying upon a component inside of the transportation cask that provides a watertight function, a strong argument can be made that moderator intrusion is not credible and should not be a required assumption for criticality evaluations during normal or hypothetical accident conditions of transportation. This Transportation Task report addresses the assigned FY 2012 work that supports the proposed moderator exclusion concept as well as a standardized transportation system. The two tasks assigned were to (1) promote the proposed moderator exclusion concept to both regulatory and nuclear industry audiences and (2) advance specific technical issues in order to improve American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section III, Division 3 rules for storage and transportation containments. The common point behind both of the assigned tasks is to provide more options that can be used to resolve current issues being debated regarding the future transportation of used fuel after extended storage.« less

  3. Using Workflow Diagrams to Address Hand Hygiene in Pediatric Long-Term Care Facilities1

    PubMed Central

    Carter, Eileen J.; Cohen, Bevin; Murray, Meghan T.; Saiman, Lisa; Larson, Elaine L.

    2015-01-01

    Hand hygiene (HH) in pediatric long-term care settings has been found to be sub-optimal. Multidisciplinary teams at three pediatric long-term care facilities developed step-by-step workflow diagrams of commonly performed tasks highlighting HH opportunities. Diagrams were validated through observation of tasks and concurrent diagram assessment. Facility teams developed six workflow diagrams that underwent 22 validation observations. Four main themes emerged: 1) diagram specificity, 2) wording and layout, 3) timing of HH indications, and 4) environmental hygiene. The development of workflow diagrams is an opportunity to identify and address the complexity of HH in pediatric long-term care facilities. PMID:25773517

  4. Analysis of Residual Acceleration Effects on Transport and Segregation During Directional Solidification of Tin-Bismuth in the MEPHISTO Furnace Facility

    NASA Technical Reports Server (NTRS)

    Alexander, J. Iwan D.

    1998-01-01

    The research accomplishments summarized in this Final Report during the period from 3/95 to 3/98, which included a 12 months no-cost extension granted at the end of the nominal 2 year period of performance. The report has 5 sections, in section 1 the objectives are presented, a task description is given and the background and significance of the work is outlined. In section 2 the research accomplishments are summarized. In section 3 publications and presentations are listed. Student participation is listed in 4. The work is summarized in section 5. and references for sections 1 and 2 are supplied in section 6. The object of this work, is to approach the problem of determining the transport conditions (and effects of residual acceleration) during the plane-front directional solidification of a tin-bismuth alloy under low gravity conditions. The work involved using a combination of 2- and 3-D numerical models, scaling analyses, ID models and the results of ground-based and low-gravity experiments. The experiments conducted in the MEPHISTO furnace facility during the USW-3 space flight which took place between February 22 through March 6, 199). This experiment represents an unprecedented opportunity to make a quantitative correlation between residual accelerations and the response of an actual experimental solidification

  5. The experience of the FERMI@Elettra photon beam transport and diagnostics system (PADReS) during three years of continuous support of machine and user experiments: achievements, lessons learned, and future upgrades

    NASA Astrophysics Data System (ADS)

    Zangrando, Marco; Fava, Claudio; Gerusina, Simone; Gobessi, Riccardo; Mahne, Nicola; Mazzucco, Eric; Raimondi, Lorenzo; Rumiz, Luca; Svetina, Cristian

    2014-09-01

    The FERMI FEL facility has begun delivering photons in 2011, becoming in late 2012 the first seeded facility open to external users worldwide. Since then, several tens of experiments have been carried out on the three operative endstations LDM, DiProI, and EIS-TIMEX. Starting from the commissioning phase, the transport and diagnostics system (PADReS) has been continuously developed and upgraded, becoming the indispensable interface between the machine and the experimental chambers. Moreover, PADReS itself has served as an active player for several machine studies as well as for various state-of-the-art experiments. In particular, some elements of PADReS have become key features to perform cutting edge experiments: the online energy spectrometer, the active optics refocusing systems, the split and delay line, and so on. For each of them the peculiar advantages will be described showing the actual implementation in the experiments. The experience gathered so far in fulfilling the needs of both machine and experimental physicists will be discussed, with particular emphasis on the solutions adopted in different scenarios. Recurrent requests and major difficulties will be reported so to give a glimpse about the standard tasks to be solved when preparing new and demanding experiments. Finally, some ideas and near-future improvements will be presented and discussed.

  6. 77 FR 16651 - National Defense Resources Preparedness

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-22

    ..., equipment and facilities, such as transportation carrier shop and repair facilities. ``Civil transportation... agencies with authority delegated under section 201 of this order. (i) ``Health resources'' means drugs...

  7. Advanced transportation system study: Manned launch vehicle concepts for two way transportation system payloads to LEO. Work breakdown structure and work breakdown structure dictionary

    NASA Technical Reports Server (NTRS)

    Duffy, James B.

    1992-01-01

    The report describes the work breakdown structure (WBS) and its associated WBS dictionary for task area 1 of contract NAS8-39207, advanced transportation system studies (ATSS). This WBS format is consistent with the preliminary design level of detail employed by both task area 1 and task area 4 in the ATSS study and is intended to provide an estimating structure for parametric cost estimates.

  8. Extravehicular activity training and hardware design consideration

    NASA Technical Reports Server (NTRS)

    Thuot, P. J.; Harbaugh, G. J.

    1995-01-01

    Preparing astronauts to perform the many complex extravehicular activity (EVA) tasks required to assemble and maintain Space Station will be accomplished through training simulations in a variety of facilities. The adequacy of this training is dependent on a thorough understanding of the task to be performed, the environment in which the task will be performed, high-fidelity training hardware and an awareness of the limitations of each particular training facility. Designing hardware that can be successfully operated, or assembled, by EVA astronauts in an efficient manner, requires an acute understanding of human factors and the capabilities and limitations of the space-suited astronaut. Additionally, the significant effect the microgravity environment has on the crew members' capabilities has to be carefully considered not only for each particular task, but also for all the overhead related to the task and the general overhead associated with EVA. This paper will describe various training methods and facilities that will be used to train EVA astronauts for Space Station assembly and maintenance. User-friendly EVA hardware design considerations and recent EVA flight experience will also be presented.

  9. Extravehicular activity training and hardware design consideration.

    PubMed

    Thuot, P J; Harbaugh, G J

    1995-07-01

    Preparing astronauts to perform the many complex extravehicular activity (EVA) tasks required to assemble and maintain Space Station will be accomplished through training simulations in a variety of facilities. The adequacy of this training is dependent on a thorough understanding of the task to be performed, the environment in which the task will be performed, high-fidelity training hardware and an awareness of the limitations of each particular training facility. Designing hardware that can be successfully operated, or assembled, by EVA astronauts in an efficient manner, requires an acute understanding of human factors and the capabilities and limitations of the space-suited astronaut. Additionally, the significant effect the microgravity environment has on the crew members' capabilities has to be carefully considered not only for each particular task, but also for all the overhead related to the task and the general overhead associated with EVA. This paper will describe various training methods and facilities that will be used to train EVA astronauts for Space Station assembly and maintenance. User-friendly EVA hardware design considerations and recent EVA flight experience will also be presented.

  10. Preliminary Concept of Operations for the Spent Fuel Management System--WM2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cumberland, Riley M; Adeniyi, Abiodun Idowu; Howard, Rob L

    The Nuclear Fuels Storage and Transportation Planning Project (NFST) within the U.S. Department of Energy s Office of Nuclear Energy is tasked with identifying, planning, and conducting activities to lay the groundwork for developing interim storage and transportation capabilities in support of an integrated waste management system. The system will provide interim storage for commercial spent nuclear fuel (SNF) from reactor sites and deliver it to a repository. The system will also include multiple subsystems, potentially including; one or more interim storage facilities (ISF); one or more repositories; facilities to package and/or repackage SNF; and transportation systems. The project teammore » is analyzing options for an integrated waste management system. To support analysis, the project team has developed a Concept of Operations document that describes both the potential integrated system and inter-dependencies between system components. The goal of this work is to aid systems analysts in the development of consistent models across the project, which involves multiple investigators. The Concept of Operations document will be updated periodically as new developments emerge. At a high level, SNF is expected to travel from reactors to a repository. SNF is first unloaded from reactors and placed in spent fuel pools for wet storage at utility sites. After the SNF has cooled enough to satisfy loading limits, it is placed in a container at reactor sites for storage and/or transportation. After transportation requirements are met, the SNF is transported to an ISF to store the SNF until a repository is developed or directly to a repository if available. While the high level operation of the system is straightforward, analysts must evaluate numerous alternative options. Alternative options include the number of ISFs (if any), ISF design, the stage at which SNF repackaging occurs (if any), repackaging technology, the types of containers used, repository design, component sizing, and timing of events. These alternative options arise due to technological, economic, or policy considerations. As new developments regularly emerge, the operational concepts will be periodically updated. This paper gives an overview of the different potential alternatives identified in the Concept of Operations document at a conceptual level.« less

  11. Remarks of Governor Ted Schwinden to the International Conference of the Council of Educational Facility Planners (64th, Edmonton, Alberta, October 3, 1987.

    ERIC Educational Resources Information Center

    Montana State Office of the Governor, Helena.

    This speech summarizes the recommendations of seven National Governors' Association task forces represented in "Time for Results: The Governors' 1991 Report on Education," highlighting the physical facilities group's concerns. The Task Force on Teaching confronted work force quantity and quality issues and recommended strategies for…

  12. 25 CFR 170.806 - What is an IRR Transportation Facilities Maintenance Management System?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... facility maintenance activities. It will be used to extend the service life of an IRR transportation facility, ensure safety, and report future funding needs to the Secretary. BIA will develop the IRR TFMMS. ... Management System? 170.806 Section 170.806 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND...

  13. 25 CFR 170.806 - What is an IRR Transportation Facilities Maintenance Management System?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... facility maintenance activities. It will be used to extend the service life of an IRR transportation facility, ensure safety, and report future funding needs to the Secretary. BIA will develop the IRR TFMMS. ... Management System? 170.806 Section 170.806 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND...

  14. 25 CFR 170.806 - What is an IRR Transportation Facilities Maintenance Management System?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... facility maintenance activities. It will be used to extend the service life of an IRR transportation facility, ensure safety, and report future funding needs to the Secretary. BIA will develop the IRR TFMMS. ... Management System? 170.806 Section 170.806 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND...

  15. 48 CFR 47.303-2 - F.o.b. origin, contractor's facility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false F.o.b. origin, contractor... REGULATION CONTRACT MANAGEMENT TRANSPORTATION Transportation in Supply Contracts 47.303-2 F.o.b. origin, contractor's facility. (a) Explanation of delivery term. F.o.b. origin, contractor's facility means free of...

  16. 76 FR 53045 - Prevailing Rate Systems; Abolishment of Monmouth, NJ, as a Nonappropriated Fund Federal Wage...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-25

    ... contains regulatory documents #0;having general applicability and legal effect, most of which are keyed #0... facilities activity in each county; Transportation facilities and commuting patterns; and Similarities of the... employees. The transportation facilities and commuting patterns criteria do not favor one wage area more...

  17. One of the criteria for selecting a contractor for high-rise construction

    NASA Astrophysics Data System (ADS)

    Tuskaeva, Zalina; Tagirov, Timur

    2018-03-01

    The mechanisms for management of the building complex used and proposed to date do not always provide the required result in the assessment of the construction organization facilities. Therefore, the development of new effective methods for such an assessment is an urgent task especially in questions related to high-rise construction. The article formally sets the task of assessing the technical facilities of a construction organization. Due to the use of expert methods, the weighted values of the coefficients of local indicators for technical facilities are identified

  18. 49 CFR 40.343 - What tasks may a service agent perform for an employer?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... employer? 40.343 Section 40.343 Transportation Office of the Secretary of Transportation PROCEDURES FOR TRANSPORTATION WORKPLACE DRUG AND ALCOHOL TESTING PROGRAMS Roles and Responsibilities of Service Agents § 40.343 What tasks may a service agent perform for an employer? As a service agent, you may perform for...

  19. Task-sharing with nurses to enhance access to HIV treatment in Côte d'Ivoire.

    PubMed

    McNairy, Margaret L; Bashi, Jules B; Chung, Hannah; Wemin, Louise; Lorng, Marie-Nicole Akpro; Brou, Hermann; Nioble, Cyprien; Lokossue, A; Abo, Kouame; Achi, Delphine; Ouattara, Kiyali; Sess, Daniel; Sanogo, Pongathie Adama; Ekra, Alexandre; Ettiegne-Traore, Virginie; Diabate, Conombo J; Abrams, Elaine J; El-Sadr, Wafaa M

    2017-04-01

    We report the first national programme in Côte d'Ivoire to evaluate the feasibility of nurse-led HIV care as a model of task-sharing with nurses to increase coverage and decentralisation of HIV services. Twenty-six public HIV facilities implemented either a nurse-with-onsite-physician or a nurse-with-visiting-physician model of HIV task-sharing. Routinely collected patient data were reviewed to analyse patient characteristics of those enrolling in care and initiating antiretroviral therapy (ART). Retention, loss to programme and death were compared across facility-level characteristics. A total of 1224 patients enrolled in HIV care, with 666 initiating ART, from January 2012 to May 2013 (median follow-up 13 months). The majority (94%) were adults ≥15 years. Fourteen facilities provided ART initiation for the first time during the pilot period; 20 facilities were primary level. Nurse-led care with a visiting physician was provided in 14 of the primary-level facilities. Nurse-led ART care with an onsite physician was provided in all secondary-level facilities and six of the primary-level facilities. During the pilot, 567 (85%) of patients were retained, 28 (4.2%) died, 47 (7.1%) were lost to follow-up, and 24 (3.6%) transferred. Five deaths (10.9%) were recorded among children as compared to 23 deaths (3.7%) among adults (P = 0.037). There were no differences in retention by model of nurse-led ART care. Task-sharing of HIV care and ART initiation with nurses in Côte d'Ivoire is feasible. This pilot illustrates two models of nurse-led HIV care and has informed national policy on nurse-led HIV care in Côte d'Ivoire. © 2017 John Wiley & Sons Ltd.

  20. Surviving the storms: Emergency preparedness in Texas nursing facilities and assisted living facilities.

    PubMed

    Castro, Carmen; Persson, Diane; Bergstrom, Nancy; Cron, Stanley

    2008-08-01

    This study assesses the preparedness of long-term care facilities in Texas responding to Hurricanes Katrina and Rita. A 41-item questionnaire was mailed to facilities; the response rate was 42%. Among responding facilities, 4513 residents were evacuated, and 6% of respondents reported resident death. Financial losses were reported by 8% of nursing facilities and 45% of assisted living facilities due to transportation and staff overtime. Respondents indicated the need for improved disaster preparednesstraining, better coordination, and transportation. Changes in policy and practice will lead to better trained staff who will provide the care residents need for improved health outcomes during future public health disasters.

  1. Airborne concentrations of benzene for dock workers at the ExxonMobil refinery and chemical plant, Baton Rouge, Louisiana, USA (1977-2005).

    PubMed

    Widner, Thomas E; Gaffney, Shannon H; Panko, Julie M; Unice, Kenneth M; Burns, Amanda M; Kreider, Marisa; Marshall, J Ralph; Booher, Lindsay E; Gelat, Richard H; Paustenbach, Dennis J

    2011-03-01

    Benzene is a natural constituent of crude oil and natural gas (0.1-3.0% by volume). Materials that are refined from crude oil and natural gas contain some residual benzene. Few datasets have appeared in the peer-reviewed literature characterizing exposures to benzene at specific refineries or during specific tasks. In this study, historical samples of airborne benzene collected from 1977-2005 at the ExxonMobil Baton Rouge, Louisiana, USA, docks were evaluated. Workers were categorized into 11 job titles, and both non-task (≤180 min sample duration) and task-related (<180 min) benzene concentrations were assessed. Approximately 800 personal air samples (406 non-task and 397 task-related) were analyzed. Non-task samples showed that concentrations varied significantly across job titles and generally resulted from exposures during short-duration tasks such as tank sampling. The contractor - tankerman job title had the highest average concentration [N=38, mean 1.4 parts per million (ppm), standard deviation (SD) 2.6]. Task-related samples indicated that the highest exposures were associated with the disconnection of cargo loading hoses (N=134, mean 11 ppm, SD 32). Non-task samples for specific job categories showed that concentrations have decreased over the past 30 years. Recognizing the potential for benzene exposure, this facility has required workers to use respiratory protective equipment during selected tasks and activities; thus, the concentrations measured were likely greater than those that the employee actually experienced. This study provides a job title- and task-focused analysis of occupational exposure to benzene during dock facility operations that is insightful for understanding the Baton Rouge facility and others similar to it over the past 30 years.

  2. 1. EXTERIOR SOUTHWEST CORNER VIEW, FACING NORTHEAST. BUILDING NO. 42 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. EXTERIOR SOUTHWEST CORNER VIEW, FACING NORTHEAST. BUILDING NO. 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  3. 2. EXTERIOR SOUTHEAST CORNER VIEW, FACING NORTHWEST. BUILDING NO 42 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. EXTERIOR SOUTHEAST CORNER VIEW, FACING NORTHWEST. BUILDING NO 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  4. 4. EXTERIOR NORTHWEST CORNER VIEW, FACING SOUTHEAST. BUILDING NO 42 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. EXTERIOR NORTHWEST CORNER VIEW, FACING SOUTHEAST. BUILDING NO 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  5. 3. EXTERIOR NORTHEAST CORNER VIEW, FACING SOUTHWEST. BUILDING NO 42 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. EXTERIOR NORTHEAST CORNER VIEW, FACING SOUTHWEST. BUILDING NO 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  6. Brief Survey of TSC Computing Facilities

    DOT National Transportation Integrated Search

    1972-05-01

    The Transportation Systems Center (TSC) has four, essentially separate, in-house computing facilities. We shall call them Honeywell Facility, the Hybrid Facility, the Multimode Simulation Facility, and the Central Facility. In addition to these four,...

  7. KSC-01pp0244

    NASA Image and Video Library

    2001-02-03

    The lid is off the shipping container with the Multi-Purpose Logistics Module Donatello inside. It sits on a transporter inside the Space Station Processing Facility. In the SSPF, Donatello will undergo processing by the payload test team, including integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle’s payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo. Donatello will be launched on mission STS-130, currently planned for September 2004

  8. An Aircraft Vortex Spacing System (AVOSS) for Dynamical Wake Vortex Spacing Criteria

    NASA Technical Reports Server (NTRS)

    Hinton, D. A.

    1996-01-01

    A concept is presented for the development and implementation of a prototype Aircraft Vortex Spacing System (AVOSS). The purpose of the AVOSS is to use current and short-term predictions of the atmospheric state in approach and departure corridors to provide, to ATC facilities, dynamical weather dependent separation criteria with adequate stability and lead time for use in establishing arrival scheduling. The AVOSS will accomplish this task through a combination of wake vortex transport and decay predictions, weather state knowledge, defined aircraft operational procedures and corridors, and wake vortex safety sensors. Work is currently underway to address the critical disciplines and knowledge needs so as to implement and demonstrate a prototype AVOSS in the 1999/2000 time frame.

  9. Smartphone measurement engineering - Innovative challenges for science & education, instrumentation & training

    NASA Astrophysics Data System (ADS)

    Hofmann, D.; Dittrich, P.-G.; Duentsch, E.

    2010-07-01

    Smartphones have an enormous conceptual and structural influence on measurement science & education, instrumentation & training. Smartphones are matured. They became convenient, reliable and affordable. In 2009 worldwide 174 million Smartphones has been delivered. Measurement with Smartphones is ready for the future. In only 10 years the German vision industry tripled its global sales volume to one Billion Euro/Year. Machine vision is used for mobile object identification, contactless industrial quality control, personalized health care, remote facility and transport management, safety critical surveillance and all tasks which are too complex for the human eye or too monotonous for the human brain. Aim of the paper is to describe selected success stories for the application of Smartphones for measurement engineering in science and education, instrumentation and training.

  10. Selected List of Low Energy Beam Transport Facilities for Light-Ion, High-Intensity Accelerators

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Prost, L. R.

    This paper presents a list of Low Energy Beam Transport (LEBT) facilities for light-ion, high-intensity accelerators. It was put together to facilitate comparisons with the PXIE LEBT design choices. A short discussion regarding the importance of the beam perveance in the choice of the transport scheme follows.

  11. 9 CFR 3.16 - Food and water requirements.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Transportation of Dogs and Cats 1 Transportation Standards § 3.16 Food and water requirements. (a) Each dog and... kittens less than 16 weeks of age must be offered food at least once every 12 hours. Each dog and cat must..., exhibitors, research facilities. including Federal research facilities, who transport dogs and cats in their...

  12. 9 CFR 3.16 - Food and water requirements.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Transportation of Dogs and Cats 1 Transportation Standards § 3.16 Food and water requirements. (a) Each dog and... kittens less than 16 weeks of age must be offered food at least once every 12 hours. Each dog and cat must..., exhibitors, research facilities. including Federal research facilities, who transport dogs and cats in their...

  13. Evaluation of intermodal passenger transfer facilities

    DOT National Transportation Integrated Search

    1994-09-01

    The Wisconsin Department of Transportation has initiated a study into the feasibility of locating an intermodal passenger transportation facility in downtown Milwaukee. That feasibilty study requires an evaluation of a very wide range of alternatives...

  14. 6. INTERIOR MAIN SPACE DETAIL VIEW, FACING EAST. BUILDING NO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. INTERIOR MAIN SPACE DETAIL VIEW, FACING EAST. BUILDING NO 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  15. 5. INTERIOR MAIN SPACE DETAIL VIEW, FACING WEST. BUILDING NO ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. INTERIOR MAIN SPACE DETAIL VIEW, FACING WEST. BUILDING NO 42 GARAGE & TRANSPORTATION MAINTENANCE FACILITY - NASA Industrial Plant, Garage & Transportation Maintenance Facility, 12214 Lakewood Boulevard, Downey, Los Angeles County, CA

  16. 1999 Florida Freight Stakeholders Task Force Report

    DOT National Transportation Integrated Search

    1999-11-01

    The Florida Freight Stakeholders Task Force was organized in 1998 as a result of the Governor's Transportation Summit to address two principal objectives: (1) to identify, prioritize and recommend freight transportation projects for fast track fundin...

  17. National facilities study. Volume 3: Mission and requirements model report

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The National Facility Study (NFS) was initiated in 1992 by Daniel S. Goldin, Administrator of NASA as an initiative to develop a comprehensive and integrated long-term plan for future facilities. The resulting, multi-agency NFS consisted of three Task Groups: Aeronautics, Space Operations, and Space Research and Development (R&D) Task Groups. A fourth group, the Engineering and Cost Analysis Task Group, was subsequently added to provide cross-cutting functions, such as assuring consistency in developing an inventory of space facilities. Space facilities decisions require an assessment of current and future needs. Therefore, the two task groups dealing with space developed a consistent model of future space mission programs, operations and R&D. The model is a middle ground baseline constructed for NFS analytical purposes with excursions to cover potential space program strategies. The model includes three major sectors: DOD, civilian government, and commercial space. The model spans the next 30 years because of the long lead times associated with facilities development and usage. This document, Volume 3 of the final NFS report, is organized along the following lines: Executive Summary -- provides a summary view of the 30-year mission forecast and requirements baseline, an overview of excursions from that baseline that were studied, and organization of the report; Introduction -- provides discussions of the methodology used in this analysis; Baseline Model -- provides the mission and requirements model baseline developed for Space Operations and Space R&D analyses; Excursions from the baseline -- reviews the details of variations or 'excursions' that were developed to test the future program projections captured in the baseline; and a Glossary of Acronyms.

  18. 33 CFR 154.1035 - Specific requirements for facilities that could reasonably be expected to cause significant and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... spill mitigation procedures. (i) This subsection must describe the volume(s) and oil groups that would... applicable, the worst case discharge from the non-transportation-related facility. This must be the same volume provided in the response plan for the non-transportation-related facility. (ii) This subsection...

  19. 49 CFR 195.575 - Which facilities must I electrically isolate and what inspections, tests, and safeguards are...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Which facilities must I electrically isolate and what inspections, tests, and safeguards are required? 195.575 Section 195.575 Transportation Other... Corrosion Control § 195.575 Which facilities must I electrically isolate and what inspections, tests, and...

  20. Ground Handling of Batteries at Test and Launch-site Facilities

    NASA Technical Reports Server (NTRS)

    Jeevarajan, Judith A.; Hohl, Alan R.

    2008-01-01

    Ground handling of flight as well as engineering batteries at test facilities and launch-site facilities is a safety critical process. Test equipment interfacing with the batteries should have the required controls to prevent a hazardous failure of the batteries. Test equipment failures should not induce catastrophic failures on the batteries. Transportation requirements for batteries should also be taken into consideration for safe transportation. This viewgraph presentation includes information on the safe handling of batteries for ground processing at test facilities as well as launch-site facilities.

  1. ADVANCED CUTTINGS TRANSPORT STUDY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stefan Miska; Nicholas Takach; Kaveh Ashenayi

    2004-01-31

    Final design of the mast was completed (Task 5). The mast is consisting of two welded plate girders, set next to each other, and spaced 14-inches apart. Fabrication of the boom will be completed in two parts solely for ease of transportation. The end pivot connection will be made through a single 2-inch diameter x 4 feet-8 inch long 316 SS bar. During installation, hard piping make-ups using Chiksan joints will connect the annular section and 4-inch return line to allow full movement of the mast from horizontal to vertical. Additionally, flexible hoses and piping will be installed to isolatemore » both towers from piping loads and allow recycling operations respectively. Calibration of the prototype Foam Generator Cell has been completed and experiments are now being conducted. We were able to generate up to 95% quality foam. Work is currently underway to attach the Thermo-Haake RS300 viscometer and install a view port with a microscope to measure foam bubble size and bubble size distribution. Foam rheology tests (Task 13) were carried out to evaluate the rheological properties of the proposed foam formulation. After successful completion of the first foam test, two sets of rheological tests were conducted at different foam flow rates while keeping other parameters constant (100 psig, 70F, 80% quality). The results from these tests are generally in agreement with the previous foam tests done previously during Task 9. However, an unanticipated observation during these tests was that in both cases, the frictional pressure drop in 2 inch pipe was lower than that in the 3 inch and 4 inch pipes. We also conducted the first foam cuttings transport test during this quarter. Experiments on aerated fluids without cuttings have been completed in ACTF (Task 10). Gas and liquid were injected at different flow rates. Two different sets of experiments were carried out, where the only difference was the temperature. Another set of tests was performed, which covered a wide range of pressure and temperature. Several parameters were measured during these tests including differential pressure and mixture density in the annulus. Flow patterns during the aerated fluids test have been observed through the view port in the annulus and recorded by a video camera. Most of the flow patterns were slug flow. Further increase in gas flow rate changed the wavy flow pattern to slug flow. At this stage, all of the planned cuttings transport tests have been completed. The results clearly show that temperature significantly affects the cuttings transport efficiency of aerated muds, in addition to the liquid flow rate and gas liquid ratio (GLR). Since the printed circuit board is functioning (Task 11) with acceptable noise level we were able to conduct several tests. We used the newly designed pipe test section to conduct tests. We tested to verify that we can distinguish between different depths of sand in a static bed of sand in the pipe section. The results indicated that we can distinguish between different sand levels. We tested with water, air and a mix of the two mediums. Major modifications (installation of magnetic flow meter, pipe fittings and pipelines) to the dynamic bubble characterization facility (DTF, Task 12) were completed. An Excel program that allows obtaining the desired foam quality in DTF was developed. The program predicts the foam quality by recording the time it takes to pressurize the loop with nitrogen.« less

  2. Student Assessment System. Student Performance Record. Task Detailing. Transportation/Automotive Mechanics. Georgia Vocational Education Program Articulation.

    ERIC Educational Resources Information Center

    Georgia Univ., Athens. Div. of Vocational Education.

    This booklet lists tasks and functions the student in the transportation cluster should be able to do upon entering an employment situation or a postsecondary school. (Listings are also available for the areas of allied health occupations/practical nursing and cosmetology.) Tasks are coded to correspond to those on the Student Performance Record,…

  3. NPDES Permit for Keller Transport, Inc. Groundwater Remediation Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under National Pollutant Discharge Elimination System permit number MT0030805, Keller Transport, Inc. is authorized to discharge from its groundwater remediation treatment facility in Lake County, Montana, to Flathead Lake.

  4. 23 CFR 771.118 - FTA categorical exclusions

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...) Acquisition, installation, operation, evaluation, replacement, and improvement of discrete utilities and... activities; rehabilitation of public transportation buildings, structures, or facilities; retrofitting for... transportation vehicles, facilities or structures, or upgrading to current standards. (6) Acquisition or transfer...

  5. 23 CFR 771.118 - FTA categorical exclusions

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...) Acquisition, installation, operation, evaluation, replacement, and improvement of discrete utilities and... activities; rehabilitation of public transportation buildings, structures, or facilities; retrofitting for... transportation vehicles, facilities or structures, or upgrading to current standards. (6) Acquisition or transfer...

  6. Assessment of the nursing skill mix in Mozambique using a task analysis methodology

    PubMed Central

    2014-01-01

    Background The density of the nursing and maternal child health nursing workforce in Mozambique (0.32/1000) is well below the WHO minimum standard of 1 nurse per 1000. Two levels of education were being offered for both nurses and maternal child health nurses, in programmes ranging from 18 to 30 months in length. The health care workforce in Mozambique also includes Medical Technicians and Medical Agents, who are also educated at either basic or mid-level. The Ministry of Health determined the need to document the tasks that each of the six cadres was performing within various health facilities to identify gaps, and duplications, in order to identify strategies for streamlining workforce production, while retaining highest educational and competency standards. The methodology of task analysis (TA) was used to achieve this objective. This article provides information about the TA methodology, and selected outcomes of the very broad study. Methods A cross-sectional descriptive task analysis survey was conducted over a 15 month period (2008–2009). A stratified sample of 1295 individuals was recruited from every type of health facility in all of Mozambique’s 10 provinces and in Maputo City. Respondents indicated how frequently they performed any of 233 patient care tasks. Data analysis focused on identifying areas where identical tasks were performed by the various cadres. Analyses addressed frequency of performance, grouped by level of educational preparation, within various types of health facilities. Results Task sharing ranged from 74% to 88% between basic and general nurse cadres and from 54% to 88% between maternal and child health nurse cadres, within various health facility types. Conversely, there was distinction between scope of practice for nursing and maternal/child health nursing cadres. Conclusion The educational pathways to general nursing and maternal/child health nursing careers were consolidated into one 24 month programme for each career. The scopes of practice were affirmed based on task analysis survey data. PMID:24460789

  7. TxDOT administration research : tasks completed in FY2009.

    DOT National Transportation Integrated Search

    2010-01-01

    Texas Department of Transportation (TxDOT) Project 0-6581-TI, TxDOT Administration : Research, encompasses multiple tasks that explore and support administrative aspects of : transportation research. : The project term began in October 2008 and has b...

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schey, Stephen; Francfort, Jim

    Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy’s Idaho National Laboratory, is the lead laboratory for the U.S. Department of Energy’s advanced vehicle testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America to conduct several U.S. Department of Defense-based micro-climate studies to identify potential U.S. Department of Defense transportation systems that are strong candidates for introduction or expansion of plug-in electric vehicles (PEVs). The study included Joint Base Lewis McChord, located in Washington State; Naval Air Station Whidbey Island, located in Washington State; and United States Marine Corp Base Camp Lejeune,more » located in North Carolina. The project was divided into four tasks for each of the three bases studied. Task 1 consisted of surveying the non-tactical fleet of vehicles to begin review of vehicle mission assignments and types of vehicles in service. In Task 2, the daily operational characteristics of the vehicles were identified to select vehicles for further monitoring and attachment of data loggers. Task 3 recorded vehicle movements in order to characterize the vehicles’ missions. Results of the data analysis and observations were provided. Individual observations of these selected vehicles provided the basis for recommendations related to PEV adoption (i.e., whether a battery electric vehicle or plug-in hybrid electric vehicle [collectively referred to as PEVs] can fulfill the mission requirements). It also provided the basis for recommendations related to placement of PEV charging infrastructure. In Task 4, an implementation approach was provided for near-term adoption of PEVs into the respective fleets. Each facility was provided detailed reports on each of these tasks. This paper summarizes and provides observations on the project and completes Intertek’s required actions.« less

  9. Regulatory facility guide for Ohio

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Anderson, S.S.; Bock, R.E.; Francis, M.W.

    1994-02-28

    The Regulatory Facility Guide (RFG) has been developed for the DOE and contractor facilities located in the state of Ohio. It provides detailed compilations of international, federal, and state transportation-related regulations applicable to shipments originating at destined to Ohio facilities. This RFG was developed as an additional resource tool for use both by traffic managers who must ensure that transportation operations are in full compliance with all applicable regulatory requirements and by oversight personnel who must verify compliance activities.

  10. Compact Heat Exchanger Design and Testing for Advanced Reactors and Advanced Power Cycles

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sun, Xiaodong; Zhang, Xiaoqin; Christensen, Richard

    The goal of the proposed research is to demonstrate the thermal hydraulic performance of innovative surface geometries in compact heat exchangers used as intermediate heat exchangers (IHXs) and recuperators for the supercritical carbon dioxide (s-CO 2) Brayton cycle. Printed-circuit heat exchangers (PCHEs) are the primary compact heat exchangers of interest. The overall objectives are: To develop optimized PCHE designs for different working fluid combinations including helium to s-CO 2, liquid salt to s-CO 2, sodium to s-CO 2, and liquid salt to helium; To experimentally and numerically investigate thermal performance, thermal stress and failure mechanism of PCHEs under various transients;more » and To study diffusion bonding techniques for elevated-temperature alloys and examine post-test material integrity of the PCHEs. The project objectives were accomplished by defining and executing five different tasks corresponding to these specific objectives. The first task involved a thorough literature review and a selection of IHX candidates with different surface geometries as well as a summary of prototypic operational conditions. The second task involved optimization of PCHE design with numerical analyses of thermal-hydraulic performances and mechanical integrity. The subsequent task dealt with the development of testing facilities and engineering design of PCHE to be tested in s-CO 2 fluid conditions. The next task involved experimental investigation and validation of the thermal-hydraulic performances and thermal stress distribution of prototype PCHEs manufactured with particular surface geometries. The last task involved an investigation of diffusion bonding process and posttest destructive testing to validate mechanical design methods adopted in the design process. The experimental work utilized the two test facilities at The Ohio State University (OSU) including one existing High-Temperature Helium Test Facility (HTHF) and the newly developed s-CO 2 test loop (STL) facility and s-CO 2 test facility at University of Wisconsin – Madison (UW).« less

  11. Life Sciences Research Facility automation requirements and concepts for the Space Station

    NASA Technical Reports Server (NTRS)

    Rasmussen, Daryl N.

    1986-01-01

    An evaluation is made of the methods and preliminary results of a study on prospects for the automation of the NASA Space Station's Life Sciences Research Facility. In order to remain within current Space Station resource allocations, approximately 85 percent of planned life science experiment tasks must be automated; these tasks encompass specimen care and feeding, cage and instrument cleaning, data acquisition and control, sample analysis, waste management, instrument calibration, materials inventory and management, and janitorial work. Task automation will free crews for specimen manipulation, tissue sampling, data interpretation and communication with ground controllers, and experiment management.

  12. The reality of task shifting in medicines management- a case study from Tanzania.

    PubMed

    Wiedenmayer, Karin A; Kapologwe, Ntuli; Charles, James; Chilunda, Fiona; Mapunjo, Siana

    2015-01-01

    Tanzania suffers a severe shortage of pharmaceutical staff. This negatively affects the provision of pharmaceutical services and access to medicines, particularly in rural areas. Task shifting has been proposed as a way to mitigate the impact of health worker shortfalls.The aim of this study was to understand the context and extent of task shifting in pharmaceutical management in Dodoma Region, Tanzania. We explored 1) the number of trained pharmaceutical staff as compared to clinical cadres managing medicines, 2) the national establishment for staffing levels, 3) job descriptions, 4) supply management training conducted and 5) availability of medicines and adherence to Good Storage Practice. A cross-sectional study was conducted in 270 public health facilities in 2011. A pre-tested questionnaire was administered to the person in charge of the facility to collect data on staff employed and their respective pharmaceutical tasks. Availability of 26 tracer medicines and adherence to Good Storage Practice guidelines was surveyed by direct observation. The national establishments for pharmaceutical staffing levels and job descriptions of facility cadres were analysed. While required staffing levels in 1999 were 50, the region employed a total of only 14 pharmaceutical staff in 2011. Job descriptions revealed that, next to pharmaceutical staff, only nurses were required to provide dispensing services and adherence counselling. In 95.5% of studied health facilities medicines management was done by non-pharmaceutically trained cadres, predominantly medical attendants. The first training on supply management was provided in 2005 with no refresher training thereafter. Mean availability of tracer medicines was 53%, while 56% of health facilities fully met criteria of Good Storage Practice. Task shifting is a reality in the pharmaceutical sector in Tanzania and it occurs mainly as a coping mechanism rather than a formal response to the workforce crisis. In Dodoma Region, pharmacy-related tasks and supply management have informally been shifted to clinical staff without policy guidance, explicit job descriptions, and without the necessary support through training. Implicit task shifting should be recognized and formalized. Job orientation, training and operational procedures may be useful to support non-pharmaceutical health workers to effectively manage medicine supply.

  13. Active transportation measurement : Minneapolis case study.

    DOT National Transportation Integrated Search

    2013-06-01

    This research examines longitudinal bicycle count data to better understand the impact of new bicycle facilities on use. The study site is Minneapolis which has invested close to $25 million over 8 years to improve active transportation facilities as...

  14. Sample Transport for a European Sample Curation Facility

    NASA Astrophysics Data System (ADS)

    Berthoud, L.; Vrublevskis, J. B.; Bennett, A.; Pottage, T.; Bridges, J. C.; Holt, J. M. C.; Dirri, F.; Longobardo, A.; Palomba, E.; Russell, S.; Smith, C.

    2018-04-01

    This work has looked at the recovery of Mars Sample Return capsule once it arrives on Earth. It covers possible landing sites, planetary protection requirements, and transportation from the landing site to a European Sample Curation Facility.

  15. Complex evaluation of the loft-style of retrivation as a type of building conversion

    NASA Astrophysics Data System (ADS)

    Chulkov, V.; Kazaryan, R.; Kuzina, O.; Maloyan, G.; Efimenko, A.

    2017-10-01

    Construction reorganization is part of a basic reorganization cycle in which four phases (phases, states, technological redistribution) are consistently implemented: device, disorganization, reorganization and co-organization. The field of our research lies in the phase of reconstruction. One of the varieties of building reconstruction is retrieval (from English retrieve - to restore, find) - bringing the reorganized object into a working state by attaching to the old functional building system of the new system. Retraining provides the ability to replace elements of the new system locally or in general (implementing the principle of “assembly-disassembly”) and provides for the elimination of the moral deterioration of the building and the normal operation of the facility. In the construction and transport industry there is a sufficiently large number of multiparameter tasks that require a systematic approach and the definition of a single integrated indicator of the effectiveness of the operation. These tasks can be solved using a variety of approaches. One of such approaches, as the method of integral evaluation based on stellar infographic models, is considered.

  16. Factors influencing modes of transport and travel time for obstetric care: a mixed methods study in Zambia and Uganda.

    PubMed

    Sacks, Emma; Vail, Daniel; Austin-Evelyn, Katherine; Greeson, Dana; Atuyambe, Lynn M; Macwan'gi, Mubiana; Kruk, Margaret E; Grépin, Karen A

    2016-04-01

    Transportation is an important barrier to accessing obstetric care for many pregnant and postpartum women in low-resource settings, particularly in rural areas. However, little is known about how pregnant women travel to health facilities in these settings. We conducted 1633 exit surveys with women who had a recent facility delivery and 48 focus group discussions with women who had either a home or a facility birth in the past year in eight districts in Uganda and Zambia. Quantitative data were analysed using univariate statistics, and qualitative data were analysed using thematic content analysis techniques. On average, women spent 62-68 min travelling to a clinic for delivery. Very different patterns in modes of transport were observed in the two countries: 91% of Ugandan women employed motorized forms of transportation, while only 57% of women in Zambia did. Motorcycle taxis were the most commonly used in Uganda, while cars, trucks and taxis were the most commonly used mode of transportation in Zambia. Lower-income women were less likely to use motorized modes of transportation: in Zambia, women in the poorest quintile took 94 min to travel to a health facility, compared with 34 for the wealthiest quintile; this difference between quintiles was ∼50 min in Uganda. Focus group discussions confirmed that transport is a major challenge due to a number of factors we categorized as the 'three A's:' affordability, accessibility and adequacy of transport options. Women reported that all of these factors had influenced their decision not to deliver in a health facility. The two countries had markedly different patterns of transportation for obstetric care, and modes of transport and travel times varied dramatically by wealth quintile, which policymakers need to take into account when designing obstetric transport interventions. © The Author 2015. Published by Oxford University Press. All rights reserved. For permissions, please email: journals.permissions@oup.com.

  17. MPLM Donatello is offloaded at the SLF

    NASA Technical Reports Server (NTRS)

    2001-01-01

    At the KSC Shuttle Landing Facility, the Italian Space Agency's Multi- Purpose Logistics Module Donatello begins rolling out of the Airbus '''Beluga''' air cargo plane that brought it from the factory of Alenia Aerospazio in Turin, Italy. The third of three for the International Space Station, the module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.

  18. MPLM Donatello is offloaded at the SLF

    NASA Technical Reports Server (NTRS)

    2001-01-01

    At the KSC Shuttle Landing Facility, an Airbus '''Beluga''' air cargo plane opens to reveal its cargo, the Italian Space Agency's Multi- Purpose Logistics Module Donatello, from the factory of Alenia Aerospazio in Turin, Italy. The third of three for the International Space Station, the module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.

  19. MPLM Donatello is offloaded at the SLF

    NASA Technical Reports Server (NTRS)

    2001-01-01

    At the KSC Shuttle Landing Facility, the Italian Space Agency's Multi- Purpose Logistics Module Donatello rolls out of the Airbus '''Beluga''' air cargo plane that brought it from the factory of Alenia Aerospazio in Turin, Italy. The third of three for the International Space Station, the module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.

  20. Can a GIS toolbox assess the environmental risk of oil spills? Implementation for oil facilities in harbors.

    PubMed

    Valdor, Paloma F; Gómez, Aina G; Velarde, Víctor; Puente, Araceli

    2016-04-01

    Oil spills are one of the most widespread problems in port areas (loading/unloading of bulk liquid, fuel supply). Specific environmental risk analysis procedures for diffuse oil sources that are based on the evolution of oil in the marine environment are needed. Diffuse sources such as oil spills usually present a lack of information, which makes the use of numerical models an arduous and occasionally impossible task. For that reason, a tool that can assess the risk of oil spills in near-shore areas by using Geographical Information System (GIS) is presented. The SPILL Tool provides immediate results by automating the process without miscalculation errors. The tool was developed using the Python and ArcGIS scripting library to build a non-ambiguous geoprocessing workflow. The SPILL Tool was implemented for oil facilities at Tarragona Harbor (NE Spain) and validated showing a satisfactory correspondence (around 0.60 RSR error index) with the results obtained using a 2D calibrated oil transport numerical model. Copyright © 2016 Elsevier Ltd. All rights reserved.

  1. BMP effectiveness/efficiency monitoring evaluation of regional information and data : response to Tasks 2 & 3 : information analysis and needs assessment.

    DOT National Transportation Integrated Search

    2002-10-04

    The second task, Task 2, includes analyzing the information obtained in Task 1, expanding it if necessary, and identifying the extent of regional information and data with respect to the types of water quality facilities typically designed for the tr...

  2. Service on demand for ISS users

    NASA Astrophysics Data System (ADS)

    Hüser, Detlev; Berg, Marco; Körtge, Nicole; Mildner, Wolfgang; Salmen, Frank; Strauch, Karsten

    2002-07-01

    Since the ISS started its operational phase, the need of logistics scenarios and solutions, supporting the utilisation of the station and its facilities, becomes increasingly important. Our contribution to this challenge is a SERVICE On DEMAND for ISS users, which offers a business friendly engineering and logistics support for the resupply of the station. Especially the utilisation by commercial and industrial users is supported and simplified by this service. Our industrial team, consisting of OHB-System and BEOS, provides experience and development support for space dedicated hard- and software elements, their transportation and operation. Furthermore, we operate as the interface between customer and the envisaged space authorities. Due to a variety of tailored service elements and the ongoing servicing, customers can concentrate on their payload content or mission objectives and don't have to deal with space-specific techniques and regulations. The SERVICE On DEMAND includes the following elements: ITR is our in-orbit platform service. ITR is a transport rack, used in the SPACEHAB logistics double module, for active and passive payloads on subrack- and drawer level of different standards. Due to its unique late access and early retrieval capability, ITR increases the flexibility concerning transport capabilities to and from the ISS. RIST is our multi-functional test facility for ISPR-based experiment drawer and locker payloads. The test program concentrates on physical and functional interface and performance testing at the payload developers site prior to the shipment to the integration and launch. The RIST service program comprises consulting, planning and engineering as well. The RIST test suitcase is planned to be available for lease or rent to users, too. AMTSS is an advanced multimedia terminal consulting service for communication with the space station scientific facilities, as part of the user home-base. This unique ISS multimedia kit combines communication technologies, software tools and hardware to provide a simple and cost-efficient access to data from the station, using the interconnection ground subnetwork. BEOLOG is our efficient ground logistics service for the transportation of payload hardware and support equipment from the user location to the launch/landing sites for the ISS service flights and back home. The main function of this service is the planning and organisation of all packaging, handling, storage & transportation tasks according to international rules. In conclusion, we offer novel service elements for logistics ground- and flight-infrastructure, dedicated for ISS users. These services can be easily adapted to the needs of users and are suitable for other μg- platforms as well.

  3. Transport choice when travelling to a sports facility: the role of perceived route features - Results from a cross-sectional study in the Netherlands.

    PubMed

    de Hollander, Ellen L; Scheepers, Eline; van Wijnen, Harm J; van Wesemael, Pieter Jv; Schuit, Albertine J; Wendel-Vos, Wanda; van Kempen, Elise Emm

    2015-01-01

    Physical activity and sedentary behaviour are independently associated with health outcomes, where physical activity (PA) is associated with health benefits and sedentary behaviour is associated with health risks. One possible strategy to counteract sedentary behaviour is to stimulate active transport use. As monitoring studies in the Netherlands have shown that among sedentary people the proportion of adults who engage in sports (hereafter: sports practitioners) is 62.3%, sports practitioners seem a feasible target group for this strategy. Previous studies have generally reported associations between neighbourhood characteristics and active transport use. However, the neighbourhood covers only part of the route to a certain destination. Therefore, we examined the association between perceived route features and transport choice when travelling up to 7.5 kilometres to a sports facility among sports practitioners. For 1118 Dutch sports practitioners - who indicated that they practice a sport and travel to a sports facility - age 18 and older, data on transport choice and perceived features of the route to a sports facility were gathered. Participants were classified into one of three transport groups based on their transport choice: car users, cyclists and walkers. Participants were asked whether perceived route features influenced their transport choice. Logistic regression was used to model the odds of cycling versus car use and walking versus car use in the association with perceived route features, adjusted for potential confounders. Perceived traffic safety was associated with lower odds of cycling (OR: 0.36, 95% CI: 0.15-0.86). Perceived route duration was associated with lower odds of both cycling (OR: 0.54, 95%CI: 0.39-0.75) and walking (OR: 0.60, 95%CI: 0.36-1.00). Perceived distance to a sports facility and having to make a detour when using other transport modes than the chosen transport mode were associated with higher odds of both cycling and walking (ORrange: 1.82-5.21). What and who people encountered during their trip (i.e. visual aspects) was associated with higher odds of both cycling and walking (ORrange: 2.40-3.69). Perceived traffic safety, duration, distance, detour, and visual aspects, when travelling to a sports facility were associated with transport choice. Therefore, the perception of route features should be considered when stimulating active transport use among sports practitioners.

  4. Getting Beyond Yucca Mountain - 12305

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Halstead, Robert J.; Williams, James M.

    2012-07-01

    The U.S. Department of Energy has terminated the Yucca Mountain repository project. The U.S. Nuclear Regulatory Commission has indefinitely suspended the Yucca Mountain licensing proceeding. The presidentially-appointed Blue Ribbon Commission (BRC) on America's Nuclear Future is preparing a report, due in January 2012, to the Secretary of Energy on recommendations for a new national nuclear waste management and disposal program. The BRC Draft Report published in July 2011 provides a compelling critique of the past three decades failed efforts in the United States to site storage and disposal facilities for spent nuclear fuel (SNF) and high-level radioactive waste (HLW). However,more » the BRC Draft Report fails to provide detailed guidance on how to implement an alternative, successful approach to facility site selection. The comments submitted to the BRC by the State of Nevada Agency for Nuclear Projects provide useful details on how the US national nuclear waste program can get beyond the failed Yucca Mountain repository project. A detailed siting process, consisting of legislative elements, procedural elements, and 'rules' for volunteer sites, could meet the objectives of the BRC and the Western Governors Association (WGA), while promoting and protecting the interests of potential host states. The recent termination of the proposed Yucca Mountain repository provides both an opportunity and a need to re-examine the United States' nuclear waste management program. The BRC Draft Report published in July 2011 provides a compelling critique of the past three decades failed efforts in the United States to site storage and disposal facilities for SNF and HLW. It is anticipated that the BRC Final report in January 2012 will recommend a new general course of action, but there will likely continue to be a need for detailed guidance on how to implement an alternative, successful approach to facility site selection. Getting the nation's nuclear waste program back on track requires, among other things, new principles for siting-principles based on partnership between the federal implementing agency and prospective host states. These principles apply to the task of developing an integrated waste management strategy, to interactions between the federal government and prospective host states for consolidated storage and disposal facilities, and to the logistically and politically complicated task of transportation system design. Lessons from the past 25 years, in combination with fundamental parameters of the nuclear waste management task in the US, suggest new principles for partnership outlined in this paper. These principles will work better if well-grounded and firm guidelines are set out beforehand and if the challenge of maintaining competence, transparency and integrity in the new organization is treated as a problem to be addressed rather than a result to be expected. (authors)« less

  5. A job analysis of care helpers

    PubMed Central

    Choi, Kyung-Sook; Jeong, Seungeun; Kim, Seulgee; Park, Hyeung-Keun; Seok, Jae Eun

    2012-01-01

    The aim of this study was to examine the roles of care helpers through job analysis. To do this, this study used the Developing A Curriculum Method (DACUM) to classify job content and a multi-dimensional study design was applied to identify roles and create a job description by looking into the appropriateness, significance, frequency, and difficulty of job content as identified through workshops and cross-sectional surveys conducted for appropriateness verification. A total of 418 care helpers working in nursing facilities and community senior service facilities across the country were surveyed. The collected data were analyzed using PASW 18.0 software. Six duties and 18 tasks were identified based on the job model. Most tasks were found to be "important task", scoring 4.0 points or above. Physical care duties, elimination care, position changing and movement assistance, feeding assistance, and safety care were identified as high frequency tasks. The most difficult tasks were emergency prevention, early detection, and speedy reporting. A summary of the job of care helpers is providing physical, emotional, housekeeping, and daily activity assistance to elderly patients with problems in independently undertaking daily activities due to physical or mental causes in long-term care facilities or at the client's home. The results of this study suggest a task-focused examination, optimizing the content of the current standard teaching materials authorized by the Ministry of Health and Welfare while supplementing some content which was identified as task elements but not included in the current teaching materials and fully reflecting the actual frequency and difficulty of tasks. PMID:22323929

  6. 33 CFR Appendix C to Part 154 - Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...(s) for the type of oil handled, stored, or transported at the facility (non-persistent (Group I) or... oil handled, stored, or transported at the facility (non-persistent (Group I) or persistent (Groups II... Factors for Petroleum Oil Groups Non-Persistent Oil: Group I 1.0 Persistent Oil: Group II 1.8 Group III 2...

  7. 33 CFR Appendix C to Part 154 - Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...(s) for the type of oil handled, stored, or transported at the facility (non-persistent (Group I) or... oil handled, stored, or transported at the facility (non-persistent (Group I) or persistent (Groups II... Factors for Petroleum Oil Groups Non-Persistent Oil: Group I 1.0 Persistent Oil: Group II 1.8 Group III 2...

  8. 33 CFR Appendix C to Part 154 - Guidelines for Determining and Evaluating Required Response Resources for Facility Response Plans

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...(s) for the type of oil handled, stored, or transported at the facility (non-persistent (Group I) or... oil handled, stored, or transported at the facility (non-persistent (Group I) or persistent (Groups II... Factors for Petroleum Oil Groups Non-Persistent Oil: Group I 1.0 Persistent Oil: Group II 1.8 Group III 2...

  9. Statewide Publc Facilities section, Alaska Department of Transportation &

    Science.gov Websites

    &PF> Statewide Public Facilities Welcome to the Statewide Public Facilities Jack Hernandez Sport Fish Hatchery Anchorage Sport Fish Hatchery Statewide Public Facilities provides project management

  10. A novel image database analysis system maintenance of transportation facility.

    DOT National Transportation Integrated Search

    2009-01-01

    The current project was funded by MIOH-UTC in the Spring of 2008 to investigate efficient : maintenance methods for transportation facilities. To achieve the objectives of the project, the : PIs undertook the research of various technologies of image...

  11. 78 FR 15112 - Rulemaking Advisory Committee; Transport Airplane Performance and Handling Characteristics-New Task

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-08

    ... coordination with other working groups. 2. Takeoff and Landing Performance. Regulatory requirements and... Committee; Transport Airplane Performance and Handling Characteristics--New Task AGENCY: Federal Aviation... new or revised requirements and guidance material for airplane performance and handling...

  12. Overview of Remote Handling Equipment Used for the NPP A1 Decommissioning - 12141

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kravarik, K.; Medved, J.; Pekar, A.

    The first Czechoslovak NPP A1 was in operation from 1972 to 1977 and it was finally shutdown due to an accident (level 4 according to the INES). The presence of radioactive, toxic or hazardous materials limits personnel access to facilities and therefore it is necessary to use remote handling technologies for some most difficult characterization, retrieval, decontamination and dismantling tasks. The history of remote handling technologies utilization started in nineties when the spent nuclear fuel, including those fuel assemblies damaged during the accident, was prepared for the transport to Russia. Subsequent significant development of remote handling equipment continued during implementationmore » of the NPP A1 decommissioning project - Stage I and ongoing Stage II. Company VUJE, Inc. is the general contractor for both mentioned stages of the decommissioning project. Various remote handling manipulators and robotics arms were developed and used. It includes remotely controlled vehicle manipulator MT-15 used for characterisation tasks in hostile and radioactive environment, special robust manipulator DENAR-41 used for the decontamination of underground storage tanks and multi-purposes robotics arms MT-80 and MT-80A developed for variety of decontamination and dismantling tasks. The heavy water evaporator facility dismantling is the current task performed remotely by robotics arm MT-80. The heavy water evaporator is located inside the main production building in the room No. 220 where loose surface contamination varies from 10 Bq/cm{sup 2} to 1x10{sup 3} Bq/cm{sup 2}, dose rate is up to 1.5 mGy/h and the feeding pipeline contained liquid RAW with high tritium content. Presented manipulators have been designed for broad range of decommissioning tasks. They are used for recognition, sampling, waste retrieval from large underground tanks, decontamination and dismantling of technological equipments. Each of the mentioned fields claims specific requirements on design of manipulator, their operation and control systems as well as tools of manipulators. Precise planning of decontamination and dismantling tasks is necessary for its successful performance by remotely controlled manipulator. The example of the heavy water evaporator demonstrates typical procedure for decommissioning of contaminated technological equipment by remotely controlled manipulators - planning of decommissioning tasks, preparatory tasks, modification of applied tools and design of specific supporting constructions for manipulator and finally decontamination and dismantling themselves. Due to the particularly demanding conditions in highly contaminated A1 NPP, a team of experts with special know-how in the field of decommissioning has grown up, and unique technological equipment enabling effective and safe work in environment with a high radiation level has been developed. (authors)« less

  13. A Microsoft Project-Based Planning, Tracking, and Management Tool for the National Transonic Facility's Model Changeover Process

    NASA Technical Reports Server (NTRS)

    Vairo, Daniel M.

    1998-01-01

    The removal and installation of sting-mounted wind tunnel models in the National Transonic Facility (NTF) is a multi-task process having a large impact on the annual throughput of the facility. Approximately ten model removal and installation cycles occur annually at the NTF with each cycle requiring slightly over five days to complete. The various tasks of the model changeover process were modeled in Microsoft Project as a template to provide a planning, tracking, and management tool. The template can also be used as a tool to evaluate improvements to this process. This document describes the development of the template and provides step-by-step instructions on its use and as a planning and tracking tool. A secondary role of this document is to provide an overview of the model changeover process and briefly describe the tasks associated with it.

  14. Characterization of stormwater at selected South Carolina Department of Transportation maintenance yards and section shed facilities in Ballentine, Conway, and North Charleston, South Carolina, 2010-12

    USGS Publications Warehouse

    Journey, Celeste A.; Conlon, Kevin J.

    2014-01-01

    Increased impervious surfaces (driveways, parking lots, and buildings) and human activities (residential, industrial, and commercial) have been linked to substantial changes in both the quality and quantity of stormwater on a watershed scale (Brabec and others, 2002; Pitt and Maestre, 2005). Small-scale storage and equipment repair facilities increase impervious surfaces that prevent infiltration of stormwater, and these facilities accommodate activities that can introduce trace metals, organic compounds, and other contaminants to the facility’s grounds. Thus, these small facilities may contribute pollutants to the environment during storm events (U.S. Environmental Protection Agency, 1992). The South Carolina Department of Transportation (SCDOT) operates section shed and maintenance yard facilities throughout the State. Prior to this investigation, the SCDOT had no data to define the quality of stormwater leaving these facilities. To provide these data, the U.S. Geological Survey (USGS), in cooperation with the SCDOT, conducted an investigation to identify and quantify constituents that are transported in stormwater from two maintenance yards and a section shed in three different areas of South Carolina. The two maintenance yards, in North Charleston and Conway, S.C., were selected because they represent facilities where equipment and road maintenance materials are stored and complete equipment repair operations are conducted. The section shed, in Ballentine, S.C., was selected because it is a facility that stores equipment and road maintenance material. Characterization of the constituents that were transported in stormwater from these representative SCDOT maintenance facilities may be used by the SCDOT in the development of stormwater management plans for similar section shed and maintenance yard facilities throughout the State to improve stormwater quality.

  15. Space transportation nodes assumptions and requirements: Lunar base systems study task 2.1

    NASA Technical Reports Server (NTRS)

    Kahn, Taher Ali; Simonds, Charles H.; Stump, William R.

    1988-01-01

    The Space Transportation Nodes Assumptions and Requirements task was performed as part of the Advanced Space Transportation Support Contract, a NASA Johnson Space Center (JSC) study intended to provide planning for a Lunar Base near the year 2000. The original task statement has been revised to satisfy the following queries: (1) What vehicles are to be processed at the transportation node; (2) What is the flow of activities involved in a vehicle passing through the node; and (3) What node support resources are necessary to support a lunar scenario traffic model composed of a mix of vehicles in an active flight schedule. The Lunar Base Systems Study is concentrating on the initial years of the Phase 2 Lunar Base Scenario. The study will develop the first five years of that phase in order to define the transportation and surface systems (including mass, volumes, power requirements, and designs).

  16. Research reactor decommissioning experience - concrete removal and disposal -

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Manning, Mark R.; Gardner, Frederick W.

    1990-07-01

    Removal and disposal of neutron activated concrete from biological shields is the most significant operational task associated with research reactor decommissioning. During the period of 1985 thru 1989 Chem-Nuclear Systems, Inc. was the prime contractor for complete dismantlement and decommissioning of the Northrop TRIGA Mark F, the Virginia Tech Argonaut, and the Michigan State University TRIGA Mark I Reactor Facilities. This paper discusses operational requirements, methods employed, and results of the concrete removal, packaging, transport and disposal operations for these (3) research reactor decommissioning projects. Methods employed for each are compared. Disposal of concrete above and below regulatory release limitsmore » for unrestricted use are discussed. This study concludes that activated reactor biological shield concrete can be safely removed and buried under current regulations.« less

  17. Practical methods for analyzing pedestrian and bicycle use of a transportation facility.

    DOT National Transportation Integrated Search

    2010-02-01

    The objective of the project is to analyze existing technologies used for the process of generating counts of bicycles : and pedestrians in transportation facilities such as walk and bicycle bridges, urban bicycle routes, bicycle trails etc. : The ad...

  18. SUMO: operation and maintenance management web tool for astronomical observatories

    NASA Astrophysics Data System (ADS)

    Mujica-Alvarez, Emma; Pérez-Calpena, Ana; García-Vargas, María. Luisa

    2014-08-01

    SUMO is an Operation and Maintenance Management web tool, which allows managing the operation and maintenance activities and resources required for the exploitation of a complex facility. SUMO main capabilities are: information repository, assets and stock control, tasks scheduler, executed tasks archive, configuration and anomalies control and notification and users management. The information needed to operate and maintain the system must be initially stored at the tool database. SUMO shall automatically schedule the periodical tasks and facilitates the searching and programming of the non-periodical tasks. Tasks planning can be visualized in different formats and dynamically edited to be adjusted to the available resources, anomalies, dates and other constrains that can arise during daily operation. SUMO shall provide warnings to the users notifying potential conflicts related to the required personal availability or the spare stock for the scheduled tasks. To conclude, SUMO has been designed as a tool to help during the operation management of a scientific facility, and in particular an astronomical observatory. This is done by controlling all operating parameters: personal, assets, spare and supply stocks, tasks and time constrains.

  19. Capabilities of the Large-Scale Sediment Transport Facility

    DTIC Science & Technology

    2016-04-01

    experiments in wave /current environments. INTRODUCTION: The LSTF (Figure 1) is a large-scale laboratory facility capable of simulating conditions...comparable to low- wave energy coasts. The facility was constructed to address deficiencies in existing methods for calculating longshore sediment...transport. The LSTF consists of a 30 m wide, 50 m long, 1.4 m deep basin. Waves are generated by four digitally controlled wave makers capable of producing

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allaria, Enrico; Diviacco, Bruno; Callegari, Carlo

    The two single-pass, externally seeded free-electron lasers (FELs) of the FERMI user facility are designed around Apple-II-type undulators that can operate at arbitrary polarization in the vacuum ultraviolet-to-soft x-ray spectral range. Furthermore, within each FEL tuning range, any output wavelength and polarization can be set in less than a minute of routine operations. We report the first demonstration of the full output polarization capabilities of FERMI FEL-1 in a campaign of experiments where the wavelength and nominal polarization are set to a series of representative values, and the polarization of the emitted intense pulses is thoroughly characterized by three independentmore » instruments and methods, expressly developed for the task. The measured radiation polarization is consistently >90% and is not significantly spoiled by the transport optics; differing, relative transport losses for horizontal and vertical polarization become more prominent at longer wavelengths and lead to a non-negligible ellipticity for an originally circularly polarized state. The results from the different polarimeter setups validate each other, allow a cross-calibration of the instruments, and constitute a benchmark for user experiments.« less

  1. Sharing Data between Mobile Devices, Connected Vehicles and Infrastructure Task 6: Prototype Acceptance Test Summary Report

    DOT National Transportation Integrated Search

    2017-10-30

    The Task 6 Prototype Acceptance Test Summary Report summarizes the results of Acceptance Testing carried out at Battelle facilities in accordance with the Task 6 Acceptance Test Plan. The Acceptance Tests were designed to verify that the prototype sy...

  2. 33 CFR 154.1216 - Facility classification.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 2 2012-07-01 2012-07-01 false Facility classification. 154.1216... Vegetable Oils Facilities § 154.1216 Facility classification. (a) The Coast Guard classifies facilities that... classification of a facility that handles, stores, or transports animal fats or vegetable oils. The COTP may...

  3. 33 CFR 154.1216 - Facility classification.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 2 2014-07-01 2014-07-01 false Facility classification. 154.1216... Vegetable Oils Facilities § 154.1216 Facility classification. (a) The Coast Guard classifies facilities that... classification of a facility that handles, stores, or transports animal fats or vegetable oils. The COTP may...

  4. 33 CFR 154.1216 - Facility classification.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 2 2013-07-01 2013-07-01 false Facility classification. 154.1216... Vegetable Oils Facilities § 154.1216 Facility classification. (a) The Coast Guard classifies facilities that... classification of a facility that handles, stores, or transports animal fats or vegetable oils. The COTP may...

  5. Underground Test Area Subproject Phase I Data Analysis Task. Volume VII - Tritium Transport Model Documentation Package

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    Volume VII of the documentation for the Phase I Data Analysis Task performed in support of the current Regional Flow Model, Transport Model, and Risk Assessment for the Nevada Test Site Underground Test Area Subproject contains the tritium transport model documentation. Because of the size and complexity of the model area, a considerable quantity of data was collected and analyzed in support of the modeling efforts. The data analysis task was consequently broken into eight subtasks, and descriptions of each subtask's activities are contained in one of the eight volumes that comprise the Phase I Data Analysis Documentation.

  6. Creating Standards-Based Technology Education Facilities

    ERIC Educational Resources Information Center

    Daugherty, Michael K.; Klenke, Andrew M.; Neden, Michael

    2008-01-01

    One of the most intimidating tasks faced by new or practicing technology education teachers is the challenge of creating new facilities or renovating current facilities for a new purpose. While the fourth program standard in "Advancing Excellence in Technological Literacy: Student Assessment, Professional Development, and Program Standards (AETL)"…

  7. 25 CFR 170.805 - What are the local, tribal, and BIA roles in transportation facility maintenance?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... transportation facility maintenance? 170.805 Section 170.805 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.805 What are the local... Road Maintenance dollars. ...

  8. Preliminary design of a leadership academy for the Alaska Department of Transportation and Public Facilities, report to management, reviews and discussions : [summary].

    DOT National Transportation Integrated Search

    2014-03-01

    All organizations, including such technicallyoriented organizations as the Alaska Department of : Transportation and Public Facilities (AK DOT&PF), have continuing needs for training of many types. : Opportunities for selfimprovement are essent...

  9. 36 CFR 1154.150 - Program accessibility: Existing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... TRANSPORTATION BARRIERS COMPLIANCE BOARD ENFORCEMENT OF NONDISCRIMINATION ON THE BASIS OF HANDICAP IN PROGRAMS OR ACTIVITIES CONDUCTED BY THE ARCHITECTURAL AND TRANSPORTATION BARRIERS COMPLIANCE BOARD § 1154.150 Program accessibility: Existing facilities. (a) General. The agency shall operate each program or activity so that the...

  10. 75 FR 72877 - Pipeline Safety: Updates to Pipeline and Liquefied Natural Gas Reporting Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-26

    ... liquid pipelines, and liquefied natural gas (LNG) facilities. These revisions will enhance PHMSA's... of natural gas pipelines, hazardous liquid pipelines, and LNG facilities. Specifically, PHMSA... commodity transported, and type of commodity transported. 8. Modify hazardous liquid operator telephonic...

  11. Effects of two hospital bed design features on physical demands and usability during brake engagement and patient transportation: a repeated measures experimental study.

    PubMed

    Kim, Sunwook; Barker, Linsey M; Jia, Bochen; Agnew, Michael J; Nussbaum, Maury A

    2009-03-01

    Work-related musculoskeletal disorders (WMSDs) are prevalent among healthcare workers worldwide. While existing research has focused on patient-handling techniques during activities which require direct patient contact (e.g., patient transfer), nursing tasks also involve other patient-handling activities, such as engaging bed brakes and transporting patients in beds, which could render healthcare workers at risk of developing WMSDs. Effectiveness of hospital bed design features (brake pedal location and steering-assistance) was evaluated in terms of physical demands and usability during brake engagement and patient transportation tasks. Two laboratory-based studies were conducted. In simulated brake engagement tasks, three brake pedal locations (head-end vs. foot-end vs. side of a bed) and two hands conditions (hands-free vs. hands-occupied) were manipulated. Additionally, both in-room and corridor patient transportation tasks were simulated, in which activation of steering-assistance features (5th wheel and/or front wheel caster lock) and two patient masses were manipulated. Nine novice participants were recruited from the local student population and community for each study. During brake engagement, trunk flexion angle, task completion time, and questionnaires were used to quantify postural comfort and usability. For patient transportation, dependent measures were hand forces and questionnaire responses. Brake pedal locations and steering-assistance features in hospital beds had significant effects on physical demands and usability during brake engagement and patient transportation tasks. Specifically, a brake pedal at the head-end of a bed increased trunk flexion by 74-224% and completion time by 53-74%, compared to other pedal locations. Participants reported greater overall perceived difficulty and less postural comfort with the brake pedal at the head-end. During in-room transportation, participants generally reported "Neither Low nor High" physical demands with the 5th wheel activated, compared to "Moderately High" physical demands when the 5th wheel was deactivated. Corridor transportation was similarly reported to be easier when a steering-assistance feature (the 5th wheel or front caster lock) was activated. Braking and steering-assistance features of hospital beds can have important effects on task efficiency and physical demands placed on healthcare workers. Selection of specific designs may thus be able to improve productivity and contribute to a reduction in WMSDs risk among healthcare workers.

  12. Internet Protocol Display Sharing Solution for Mission Control Center Video System

    NASA Technical Reports Server (NTRS)

    Brown, Michael A.

    2009-01-01

    With the advent of broadcast television as a constant source of information throughout the NASA manned space flight Mission Control Center (MCC) at the Johnson Space Center (JSC), the current Video Transport System (VTS) characteristics provides the ability to visually enhance real-time applications as a broadcast channel that decision making flight controllers come to rely on, but can be difficult to maintain and costly. The Operations Technology Facility (OTF) of the Mission Operations Facility Division (MOFD) has been tasked to provide insight to new innovative technological solutions for the MCC environment focusing on alternative architectures for a VTS. New technology will be provided to enable sharing of all imagery from one specific computer display, better known as Display Sharing (DS), to other computer displays and display systems such as; large projector systems, flight control rooms, and back supporting rooms throughout the facilities and other offsite centers using IP networks. It has been stated that Internet Protocol (IP) applications are easily readied to substitute for the current visual architecture, but quality and speed may need to be forfeited for reducing cost and maintainability. Although the IP infrastructure can support many technologies, the simple task of sharing ones computer display can be rather clumsy and difficult to configure and manage to the many operators and products. The DS process shall invest in collectively automating the sharing of images while focusing on such characteristics as; managing bandwidth, encrypting security measures, synchronizing disconnections from loss of signal / loss of acquisitions, performance latency, and provide functions like, scalability, multi-sharing, ease of initial integration / sustained configuration, integration with video adjustments packages, collaborative tools, host / recipient controllability, and the utmost paramount priority, an enterprise solution that provides ownership to the whole process, while maintaining the integrity of the latest technological displayed image devices. This study will provide insights to the many possibilities that can be filtered down to a harmoniously responsive product that can be used in today's MCC environment.

  13. Grip force and force sharing in two different manipulation tasks with bottles.

    PubMed

    Cepriá-Bernal, Javier; Pérez-González, Antonio; Mora, Marta C; Sancho-Bru, Joaquín L

    2017-07-01

    Grip force and force sharing during two activities of daily living were analysed experimentally in 10 right-handed subjects. Four different bottles, filled to two different levels, were manipulated for two tasks: transporting and pouring. Each test subject's hand was instrumented with eight thin wearable force sensors. The grip force and force sharing were significantly different for each bottle model. Increasing the filling level resulted in an increase in grip force, but the ratio of grip force to load force was higher for lighter loads. The task influenced the force sharing but not the mean grip force. The contributions of the thumb and ring finger were higher in the pouring task, whereas the contributions of the palm and the index finger were higher in the transport task. Mean force sharing among fingers was 30% for index, 29% for middle, 22% for ring and 19% for little finger. Practitioner Summary: We analysed grip force and force sharing in two manipulation tasks with bottles: transporting and pouring. The objective was to understand the effects of the bottle features, filling level and task on the contribution of different areas of the hand to the grip force. Force sharing was different for each task and the bottles features affected to both grip force and force sharing.

  14. Facilities | Argonne National Laboratory

    Science.gov Websites

    Skip to main content Argonne National Laboratory Toggle Navigation Toggle Search Research Facilities Advanced Powertrain Research Facility Center for Transportation Research Distributed Energy Research Center Engine Research Facility Heat Transfer Laboratory Materials Engineering Research Facility

  15. 9 CFR 3.27 - Facilities, outdoor.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... WELFARE STANDARDS Specifications for the Humane Handling, Care, Treatment, and Transportation of Guinea Pigs and Hamsters Facilities and Operating Standards § 3.27 Facilities, outdoor. (a) Hamsters shall not be housed in outdoor facilities. (b) Guinea pigs shall not be housed in outdoor facilities unless...

  16. Honeywell's Working Parents Task Force. Final Report and Recommendations.

    ERIC Educational Resources Information Center

    Honeywell, Inc., Minneapolis, Minn.

    This publication provides a summary of the Honeywell Working Parent Task Force's recommendations on how to solve problems experienced by working parents. The Task Force consisted of three committees: the Employment Practices Committee (EPC); the Parent Education Committee (PEC); and the Child Care Facilities Committee (CCFC). After examining a…

  17. 42 CFR 488.110 - Procedural guidelines.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... interviews with residents and staff, that such needs are indeed met on a regular basis. In most reviews, then... Methodology. (e) Task 3—Tour of the Facility. (f) Task 4—Observation/Interview/Medical Record Review... Representatives. Tour Summation and Focus of Remaining Survey Activity. • Task 4. Observation/Interview/Medical...

  18. The influences of Taiwan's National Health Insurance on women's choice of prenatal care facility: Investigation of differences between rural and non-rural areas.

    PubMed

    Chen, Likwang; Chen, Chi-Liang; Yang, Wei-Chih

    2008-03-29

    Taiwan's National Health Insurance (NHI), implemented in 1995, substantially increased the number of health care facilities that can deliver free prenatal care. Because of the increase in such facilities, it is usually assumed that women would have more choices regarding prenatal care facilities and thus experience reduction in travel cost. Nevertheless, there has been no research exploring these issues in the literature. This study compares how Taiwan's NHI program may have influenced choice of prenatal care facility and perception regarding convenience in transportation for obtaining such care for women in rural and non-rural areas in Taiwan. Based on data collected by a national survey conducted by Taiwan's National Health Research Institutes (NHRI) in 2000, we tried to compare how women chose prenatal care facility before and after Taiwan's National Health Insurance program was implemented. Basing our analysis on how women answered questionnaire items regarding "the type of major health care facility used and convenience of transportation to and from prenatal care facility," we investigated whether there were disparities in how women in rural and non-rural areas chose prenatal care facilities and felt about the transportation, and whether the NHI had different influences for the two groups of women. After NHI, women in rural areas were more likely than before to choose large hospitals for prenatal care services. For women in rural areas, the relative probability of choosing large hospitals to choosing non-hospital settings in 1998-1999 was about 6.54 times of that in 1990-1992. In contrast, no such change was found in women in non-rural areas. For a woman in a non-rural area, she was significantly more likely to perceive the transportation to and from prenatal care facilities to be very convenient between 1998 and 1999 than in the period between 1990 and 1992. No such improvement was found for women in rural areas. We concluded that women in rural areas were more likely to seek prenatal care in large hospitals, but were not more likely to perceive very convenient transportation to and from prenatal care facilities in the late 1990s than in the early 1990s. In contrast, women in non-rural areas did not have a stronger tendency to seek prenatal care in large hospitals in the late 1990s than in earlier periods. In addition, they did perceive an improvement in transportation for acquiring prenatal care in the late 1990s. More efforts should be made to reduce these disparities.

  19. Further assessment of houseflies (Musca domestica) as vectors for the mechanical transport and transmission of porcine reproductive and respiratory syndrome virus under field conditions.

    PubMed

    Pitkin, Andrea; Deen, John; Otake, Satoshi; Moon, Roger; Dee, Scott

    2009-04-01

    The purpose of this study was to evaluate the potential for houseflies (Musca domestica) to mechanically transport and transmit porcine reproductive and respiratory syndrome virus (PRRSV) between pig populations under controlled field conditions. The study employed swine housed in commercial livestock facilities and a release-recapture protocol involving marked (ochre-eyed) houseflies. To assess whether transport of PRRSV by insects occurred, ochre-eyed houseflies were released and collected from a facility housing an experimentally PRRSV-inoculated population of pigs (facility A) and collected from a neighboring facility located 120 m to the northwest that housed a naïve pig population (facility B). All samples were tested for PRRSV RNA by polymerase chain reaction (PCR). To assess transmission between the 2 populations, blood samples were collected from naïve pigs in facility B at designated intervals and tested by PCR. A total of 7 replicates were conducted. During 2 of 7 replicates (1 and 5), PCR-positive ochre-eyed houseflies were recovered in facility B and pigs in this facility became infected with PRRSV. Chi-squared analysis indicated that the presence of PRRSV in an insect sample was significantly (P = 0.0004) associated with infection of facility B pigs. Porcine reproductive and respiratory syndrome virus was not recovered from other reported routes of transmission during the study period, including air, fomites, and personnel. In conclusion, while an insufficient number of replicates were conducted to predict the frequency of the event, houseflies may pose some level of risk for the transport and transmission of PRRSV between pig populations under field conditions.

  20. Further assessment of houseflies (Musca domestica) as vectors for the mechanical transport and transmission of porcine reproductive and respiratory syndrome virus under field conditions

    PubMed Central

    Pitkin, Andrea; Deen, John; Otake, Satoshi; Moon, Roger; Dee, Scott

    2009-01-01

    The purpose of this study was to evaluate the potential for houseflies (Musca domestica) to mechanically transport and transmit porcine reproductive and respiratory syndrome virus (PRRSV) between pig populations under controlled field conditions. The study employed swine housed in commercial livestock facilities and a release-recapture protocol involving marked (ochre-eyed) houseflies. To assess whether transport of PRRSV by insects occurred, ochre-eyed houseflies were released and collected from a facility housing an experimentally PRRSV-inoculated population of pigs (facility A) and collected from a neighboring facility located 120 m to the northwest that housed a naïve pig population (facility B). All samples were tested for PRRSV RNA by polymerase chain reaction (PCR). To assess transmission between the 2 populations, blood samples were collected from naïve pigs in facility B at designated intervals and tested by PCR. A total of 7 replicates were conducted. During 2 of 7 replicates (1 and 5), PCR-positive ochre-eyed houseflies were recovered in facility B and pigs in this facility became infected with PRRSV. Chi-squared analysis indicated that the presence of PRRSV in an insect sample was significantly (P = 0.0004) associated with infection of facility B pigs. Porcine reproductive and respiratory syndrome virus was not recovered from other reported routes of transmission during the study period, including air, fomites, and personnel. In conclusion, while an insufficient number of replicates were conducted to predict the frequency of the event, houseflies may pose some level of risk for the transport and transmission of PRRSV between pig populations under field conditions. PMID:19436589

  1. National Transportation Atlas Databases : 2002

    DOT National Transportation Integrated Search

    2002-01-01

    The National Transportation Atlas Databases 2002 (NTAD2002) is a set of nationwide geographic databases of transportation facilities, transportation networks, and associated infrastructure. These datasets include spatial information for transportatio...

  2. National Transportation Atlas Databases : 2010

    DOT National Transportation Integrated Search

    2010-01-01

    The National Transportation Atlas Databases 2010 (NTAD2010) is a set of nationwide geographic databases of transportation facilities, transportation networks, and associated infrastructure. These datasets include spatial information for transportatio...

  3. National Transportation Atlas Databases : 2006

    DOT National Transportation Integrated Search

    2006-01-01

    The National Transportation Atlas Databases 2006 (NTAD2006) is a set of nationwide geographic databases of transportation facilities, transportation networks, and associated infrastructure. These datasets include spatial information for transportatio...

  4. National Transportation Atlas Databases : 2005

    DOT National Transportation Integrated Search

    2005-01-01

    The National Transportation Atlas Databases 2005 (NTAD2005) is a set of nationwide geographic databases of transportation facilities, transportation networks, and associated infrastructure. These datasets include spatial information for transportatio...

  5. National Transportation Atlas Databases : 2008

    DOT National Transportation Integrated Search

    2008-01-01

    The National Transportation Atlas Databases 2008 (NTAD2008) is a set of nationwide geographic databases of transportation facilities, transportation networks, and associated infrastructure. These datasets include spatial information for transportatio...

  6. National Transportation Atlas Databases : 2003

    DOT National Transportation Integrated Search

    2003-01-01

    The National Transportation Atlas Databases 2003 (NTAD2003) is a set of nationwide geographic databases of transportation facilities, transportation networks, and associated infrastructure. These datasets include spatial information for transportatio...

  7. National Transportation Atlas Databases : 2014

    DOT National Transportation Integrated Search

    2014-01-01

    The National Transportation Atlas Databases 2014 : (NTAD2014) is a set of nationwide geographic datasets of : transportation facilities, transportation networks, associated : infrastructure, and other political and administrative entities. : These da...

  8. National Transportation Atlas Databases : 2004

    DOT National Transportation Integrated Search

    2004-01-01

    The National Transportation Atlas Databases 2004 (NTAD2004) is a set of nationwide geographic databases of transportation facilities, transportation networks, and associated infrastructure. These datasets include spatial information for transportatio...

  9. National Transportation Atlas Databases : 2009

    DOT National Transportation Integrated Search

    2009-01-01

    The National Transportation Atlas Databases 2009 (NTAD2009) is a set of nationwide geographic databases of transportation facilities, transportation networks, and associated infrastructure. These datasets include spatial information for transportatio...

  10. National Transportation Atlas Databases : 2007

    DOT National Transportation Integrated Search

    2007-01-01

    The National Transportation Atlas Databases 2007 (NTAD2007) is a set of nationwide geographic databases of transportation facilities, transportation networks, and associated infrastructure. These datasets include spatial information for transportatio...

  11. National Transportation Atlas Databases : 2012

    DOT National Transportation Integrated Search

    2012-01-01

    The National Transportation Atlas Databases 2012 (NTAD2012) is a set of nationwide geographic databases of transportation facilities, transportation networks, and associated infrastructure. These datasets include spatial information for transportatio...

  12. National Transportation Atlas Databases : 2015

    DOT National Transportation Integrated Search

    2015-01-01

    The National Transportation Atlas Databases 2015 : (NTAD2015) is a set of nationwide geographic datasets of : transportation facilities, transportation networks, associated : infrastructure, and other political and administrative entities. : These da...

  13. National Transportation Atlas Databases : 2011

    DOT National Transportation Integrated Search

    2011-01-01

    The National Transportation Atlas Databases 2011 (NTAD2011) is a set of nationwide geographic databases of transportation facilities, transportation networks, and associated infrastructure. These datasets include spatial information for transportatio...

  14. Airport offsite passenger service facilities : an option for improving landside access. Volume II, Access characteristics and travel demand.

    DOT National Transportation Integrated Search

    2009-01-01

    Offsite airport facilities provide ground transportation, baggage and passenger check in, and other transportation services to departing air passengers from a remote location. The purpose of this study was to develop models to determine the airports ...

  15. 40 CFR 279.43 - Used oil transportation.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... identification number; (2) A used oil processing/re-refining facility who has obtained an EPA identification number; (3) An off-specification used oil burner facility who has obtained an EPA identification number... parts 171 through 180. Persons transporting used oil that meets the definition of a hazardous material...

  16. 40 CFR 279.43 - Used oil transportation.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... identification number; (2) A used oil processing/re-refining facility who has obtained an EPA identification number; (3) An off-specification used oil burner facility who has obtained an EPA identification number... parts 171 through 180. Persons transporting used oil that meets the definition of a hazardous material...

  17. A transportation-scheduling system for managing silvicultural projects

    Treesearch

    Jorge F. Valenzuela; H. Hakan Balci; Timothy McDonald

    2005-01-01

    A silvicultural project encompasses tasks such as sitelevel planning, regeneration, harvestin, and stand-tending treatments. an essential problem in managing silvicultural projects is to efficiently schedule the operations while considering project task due dates and costs of moving scarce resources to specific job locations. Transportation costs represent a...

  18. Application of the API/NPRA SVA methodology to transportation security issues.

    PubMed

    Moore, David A

    2006-03-17

    Security vulnerability analysis (SVA) is becoming more prevalent as the issue of chemical process security is of greater concern. The American Petroleum Institute (API) and the National Petrochemical and Refiner's Association (NPRA) have developed a guideline for conducting SVAs of petroleum and petrochemical facilities in May 2003. In 2004, the same organizations enhanced the guidelines by adding the ability to evaluate transportation security risks (pipeline, truck, and rail). The importance of including transportation and value chain security in addition to fixed facility security in a SVA is that these issues may be critically important to understanding the total risk of the operation. Most of the SVAs done using the API/NPRA SVA and other SVA methods were centered on the fixed facility and the operations within the plant fence. Transportation interfaces alone are normally studied as a part of the facility SVA, and the entire transportation route impacts and value chain disruption are not commonly considered. Particularly from a national, regional, or local infrastructure analysis standpoint, understanding the interdependencies is critical to the risk assessment. Transportation risks may include weaponization of the asset by direct attack en route, sabotage, or a Trojan Horse style attack into a facility. The risks differ in the level of access control and the degree of public exposures, as well as the dynamic nature of the assets. The public exposures along the transportation route need to be carefully considered. Risks may be mitigated by one of many strategies including internment, staging, prioritization, conscription, or prohibition, as well as by administrative security measures and technology for monitoring and isolating the assets. This paper illustrates how these risks can be analyzed by the API/NPRA SVA methodology. Examples are given of a pipeline operation, and other examples are found in the guidelines.

  19. National Transportation Atlas Databases : 2013

    DOT National Transportation Integrated Search

    2013-01-01

    The National Transportation Atlas Databases 2013 (NTAD2013) is a set of nationwide geographic datasets of transportation facilities, transportation networks, associated infrastructure, and other political and administrative entities. These datasets i...

  20. Improved retention rates with low-cost interventions in hypertension and diabetes management in a rural African environment of nurse-led care: a cluster-randomised trial.

    PubMed

    Labhardt, Niklaus D; Balo, Jean-Richard; Ndam, Mama; Manga, Engelbert; Stoll, Beat

    2011-10-01

    To compare the effects of low-level facility-based interventions on patient retention rates for cardiovascular (CV) disease in an environment of task shifting and nurse-led care in rural health districts in Central Cameroon. This study is an open-label, three-arm, cluster-randomised trial in nurse-led facilities. All three groups implemented a treatment contract. The control group (group 1) had no additional intervention, group 2 received the incentive of 1 month of free treatment every forth month of regularly respected visits, and group 3 received reminder letters in case of a missed follow-up visit. The primary outcome was patient retention at 1 year. Secondary outcomes were adherence to follow-up visit schemes and changes in blood pressure (BP) and blood glucose levels. Patients' monthly spending for drugs and transport was calculated retrospectively. A total of 33 centres and 221 patients were included. After 1 year, 109 patients (49.3%) remained in the programme. Retention rates in groups 2 and 3 were 60% and 65%, respectively, against 29% in the control group. The differences between the intervention groups and the control group were significant (P < 0.001), but differences between the two intervention groups were not (P = 0.719). There were no significant differences in BP or fasting plasma glucose trends between retained patients in the study groups. Average monthly cost to patients for antihypertensive medication was € 1.1 ± 0.9 and for diabetics €1.2 ± 1.1. Transport costs to the centres were on average €1.1 ± 1.0 for hypertensive patients and €1.1 ± 1.6 for patients with diabetes. Low-cost interventions suited to an environment of task shifting and nurse-led care and needing minimal additional resources can significantly improve retention rates in CV disease management in rural Africa. The combination of a treatment contract and reminder letters in case of missed appointments was an effective measure to retain patients in care. © 2011 Blackwell Publishing Ltd.

  1. Training and Familiarization with the Battle Command Sustainment Support System

    DTIC Science & Technology

    2010-06-11

    for Task Force Bastone and SDDC” by Mitch Chandran (Translog, Fall 2005) focuses on the initial use of the BCS3 by the Surface Deployment and...the Heartbeat of ITV for Task Force Bastone and SDDC,” Journal of Military Transportation Management (Fall 2005): 13. 49Ibid. 50Ibid. 51Colonel...Mitch. “BCS3 Becomes the Heartbeat of ITV for Task Force Bastone and SDDC.” Journal of Military Transportation Management (Fall 2005). Department

  2. Oil Pollution Act (OPA) and Federal Facilities

    EPA Pesticide Factsheets

    The Oil Pollution Prevention regulation sets forth requirements for prevention of, preparedness for, and response to oil discharges at specific non-transportation-related facilities, including federal facilities.

  3. Quantification of crew workload imposed by communications-related tasks in commercial transport aircraft

    NASA Technical Reports Server (NTRS)

    Acton, W. H.; Crabtree, M. S.; Simons, J. C.; Gomer, F. E.; Eckel, J. S.

    1983-01-01

    Information theoretic analysis and subjective paired-comparison and task ranking techniques were employed in order to scale the workload of 20 communications-related tasks frequently performed by the captain and first officer of transport category aircraft. Tasks were drawn from taped conversations between aircraft and air traffic controllers (ATC). Twenty crewmembers performed subjective message comparisons and task rankings on the basis of workload. Information theoretic results indicated a broad range of task difficulty levels, and substantial differences between captain and first officer workload levels. Preliminary subjective data tended to corroborate these results. A hybrid scale reflecting the results of both the analytical and the subjective techniques is currently being developed. The findings will be used to select representative sets of communications for use in high fidelity simulation.

  4. Code System to Calculate Tornado-Induced Flow Material Transport.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ANDRAE, R. W.

    1999-11-18

    Version: 00 TORAC models tornado-induced flows, pressures, and material transport within structures. Its use is directed toward nuclear fuel cycle facilities and their primary release pathway, the ventilation system. However, it is applicable to other structures and can model other airflow pathways within a facility. In a nuclear facility, this network system could include process cells, canyons, laboratory offices, corridors, and offgas systems. TORAC predicts flow through a network system that also includes ventilation system components such as filters, dampers, ducts, and blowers. These ventilation system components are connected to the rooms and corridors of the facility to form amore » complete network for moving air through the structure and, perhaps, maintaining pressure levels in certain areas. The material transport capability in TORAC is very basic and includes convection, depletion, entrainment, and filtration of material.« less

  5. A mobile robot system for ground servicing operations on the space shuttle

    NASA Astrophysics Data System (ADS)

    Dowling, K.; Bennett, R.; Blackwell, M.; Graham, T.; Gatrall, S.; O'Toole, R.; Schempf, H.

    1992-11-01

    A mobile system for space shuttle servicing, the Tessellator, has been configured, designed and is currently being built and integrated. Robot tasks include chemical injection and inspection of the shuttle's thermal protection system. This paper outlines tasks, rationale, and facility requirements for the development of this system. A detailed look at the mobile system and manipulator follow with a look at mechanics, electronics, and software. Salient features of the mobile robot include omnidirectionality, high reach, high stiffness and accuracy with safety and self-reliance integral to all aspects of the design. The robot system is shown to meet task, facility, and NASA requirements in its design resulting in unprecedented specifications for a mobile-manipulation system.

  6. A mobile robot system for ground servicing operations on the space shuttle

    NASA Technical Reports Server (NTRS)

    Dowling, K.; Bennett, R.; Blackwell, M.; Graham, T.; Gatrall, S.; O'Toole, R.; Schempf, H.

    1992-01-01

    A mobile system for space shuttle servicing, the Tessellator, has been configured, designed and is currently being built and integrated. Robot tasks include chemical injection and inspection of the shuttle's thermal protection system. This paper outlines tasks, rationale, and facility requirements for the development of this system. A detailed look at the mobile system and manipulator follow with a look at mechanics, electronics, and software. Salient features of the mobile robot include omnidirectionality, high reach, high stiffness and accuracy with safety and self-reliance integral to all aspects of the design. The robot system is shown to meet task, facility, and NASA requirements in its design resulting in unprecedented specifications for a mobile-manipulation system.

  7. National Transportation Atlas Databases : 1999

    DOT National Transportation Integrated Search

    1999-01-01

    The National Transportation Atlas Databases -- 1999 (NTAD99) is a set of national : geographic databases of transportation facilities. These databases include geospatial : information for transportation modal networks and intermodal terminals, and re...

  8. National Transportation Atlas Databases : 2001

    DOT National Transportation Integrated Search

    2001-01-01

    The National Transportation Atlas Databases-2001 (NTAD-2001) is a set of national geographic databases of transportation facilities. These databases include geospatial information for transportation modal networks and intermodal terminals and related...

  9. National Transportation Atlas Databases : 1996

    DOT National Transportation Integrated Search

    1996-01-01

    The National Transportation Atlas Databases -- 1996 (NTAD96) is a set of national : geographic databases of transportation facilities. These databases include geospatial : information for transportation modal networks and intermodal terminals, and re...

  10. National Transportation Atlas Databases : 2000

    DOT National Transportation Integrated Search

    2000-01-01

    The National Transportation Atlas Databases-2000 (NTAD-2000) is a set of national geographic databases of transportation facilities. These databases include geospatial information for transportation modal networks and intermodal terminals and related...

  11. National Transportation Atlas Databases : 1997

    DOT National Transportation Integrated Search

    1997-01-01

    The National Transportation Atlas Databases -- 1997 (NTAD97) is a set of national : geographic databases of transportation facilities. These databases include geospatial : information for transportation modal networks and intermodal terminals, and re...

  12. Analysis of seasonal strain measurements in asphalt materials under accelerated pavement testing and comparing field performance and laboratory measured binder tension properties : technical summary report.

    DOT National Transportation Integrated Search

    2009-06-01

    Since 1996, the Louisiana Department of Transportation and Development (LADOTD) has : utilized the Louisiana Transportation and Research Centers (LTRCs) Accelerated Loading : Facility (ALF) at the Pavement Research Facility to determine the eff...

  13. 78 FR 18534 - Transportation Worker Identification Credential (TWIC)-Reader Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-27

    ... Security Administration (TSA) established the TWIC program to address identity management shortcomings and... http://www.regulations.gov on or before May 21, 2013, or reach the Docket Management Facility by that...) Mail: Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor...

  14. 78 FR 20558 - Transportation Worker Identification Credential (TWIC)-Reader Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-05

    ... TWIC program to address identity management shortcomings and vulnerabilities identified in the nation's... docket via http://www.regulations.gov on or before May 21, 2013, or reach the Docket Management Facility... Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200...

  15. 78 FR 20289 - Transportation Worker Identification Credential (TWIC)-Reader Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-04

    ... TWIC program to address identity management shortcomings and vulnerabilities identified in the nation's... docket via http://www.regulations.gov on or before May 21, 2013, or reach the Docket Management Facility... Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200...

  16. 78 FR 22218 - Transportation Worker Identification Credential (TWIC)-Reader Requirements

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... TWIC program to address identity management shortcomings and vulnerabilities identified in the nation's... docket via http://www.regulations.gov on or before May 21, 2013, or reach the Docket Management Facility... Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor, Room W12-140, 1200...

  17. 4. View of the launch closure. Transporter/erector mounts at center, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. View of the launch closure. Transporter/erector mounts at center, security antenna at left, access building at right. View towards south. Lyon - Whiteman Air Force Base, Minuteman Missile Launch Facility Trainer T-12, Northeast of Oscar-01 Missile Alert Facility, Knob Noster, Johnson County, MO

  18. 33 CFR 105.265 - Security measures for handling cargo.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., containers, or other cargo transport units entering the facility match the delivery note or equivalent cargo..., containers or other cargo transport units, and cargo storage areas within the facility for evidence of... cargo. 105.265 Section 105.265 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND...

  19. 33 CFR 105.265 - Security measures for handling cargo.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., containers, or other cargo transport units entering the facility match the delivery note or equivalent cargo..., containers or other cargo transport units, and cargo storage areas within the facility for evidence of... cargo. 105.265 Section 105.265 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND...

  20. 33 CFR 105.265 - Security measures for handling cargo.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., containers, or other cargo transport units entering the facility match the delivery note or equivalent cargo..., containers or other cargo transport units, and cargo storage areas within the facility for evidence of... cargo. 105.265 Section 105.265 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND...

  1. 33 CFR 105.265 - Security measures for handling cargo.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., containers, or other cargo transport units entering the facility match the delivery note or equivalent cargo..., containers or other cargo transport units, and cargo storage areas within the facility for evidence of... cargo. 105.265 Section 105.265 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND...

  2. 33 CFR 105.265 - Security measures for handling cargo.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., containers, or other cargo transport units entering the facility match the delivery note or equivalent cargo..., containers or other cargo transport units, and cargo storage areas within the facility for evidence of... cargo. 105.265 Section 105.265 Navigation and Navigable Waters COAST GUARD, DEPARTMENT OF HOMELAND...

  3. 78 FR 27182 - Notice of Request for Extension of Approval of an Information Collection; Commercial...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-09

    ... Equines for Slaughter AGENCY: Animal and Plant Health Inspection Service, USDA. ACTION: Extension of... commercial transportation of equines to slaughtering facilities. DATES: We will consider all comments that we... for the commercial transportation of equines to slaughtering facilities, contact Dr. P. Gary Egrie...

  4. A Study of the Courses, Programs and Facilities at the Okaloosa-Walton Junior College/University of West Florida Joint Center in Fort Walton Beach. Report and Recommendations of the Postsecondary Education Planning Commission, 1987. Report 9.

    ERIC Educational Resources Information Center

    Florida State Postsecondary Education Planning Commission, Tallahassee.

    In 1987, a task force was convened to determine the need for further expansion of the Okaloosa-Walton Junior College/University of West Florida (OWJC/UWF) Joint Center, and, if warranted, to select a permanent site for the facility. The task force undertook a study involving: (1) collection of demographic data on the Greater Fort Walton Beach area…

  5. Relocation of the Deep Space Network Maintenance Center

    NASA Technical Reports Server (NTRS)

    Beutler, K. F.

    1981-01-01

    The Jet Propulsion Laboratory maintains a Deep Space Network (DSN) maintenance center (DMC), whose task is to engineer and manage the repair and calibration program for the electronic and mechanical equipment used in the tracking stations located at Madrid, Spain, and Canberra, Australia. The DMC also manages the Goldstone complex maintenance facility (GCMF), whose task is to repair and calibrate the Goldstone electronic and mechanical equipment. The rationale for moving the facility to Barstow, California, and the benefits derived from the move are discussed.

  6. Optical design of the National Ignition Facility main laser and switchyard/target area beam transport systems

    NASA Astrophysics Data System (ADS)

    Miller, John L.; English, R. Edward, Jr.; Korniski, Ronald J.; Rodgers, J. Michael

    1999-07-01

    The optical design of the main laser and transport mirror sections of the National Ignition Facility are described. For the main laser the configuration, layout constraints, multiple beam arrangement, pinhole layout and beam paths, clear aperture budget, ray trace models, alignment constraints, lens designs, wavefront performance, and pupil aberrations are discussed. For the transport mirror system the layout, alignment controls and clear aperture budget are described.

  7. 23 CFR 500.110 - PTMS.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT MANAGEMENT AND MONITORING SYSTEMS Management Systems § 500.110 PTMS. An effective PTMS for public transportation facilities (e.g... transportation systems operated by the State, local jurisdictions, public transportation agencies and authorities...

  8. 49 CFR 192.727 - Abandonment or deactivation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Abandonment or deactivation of facilities. 192.727... Abandonment or deactivation of facilities. (a) Each operator shall conduct abandonment or deactivation of... pipeline facility or each abandoned onshore pipeline facility that crosses over, under or through a...

  9. 49 CFR 25.410 - Comparable facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Comparable facilities. 25.410 Section 25.410... Education Programs or Activities Prohibited § 25.410 Comparable facilities. A recipient may provide separate toilet, locker room, and shower facilities on the basis of sex, but such facilities provided for students...

  10. 49 CFR 193.2019 - Mobile and temporary LNG facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Mobile and temporary LNG facilities. 193.2019... LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS General § 193.2019 Mobile and temporary LNG facilities. (a) Mobile and temporary LNG facilities for peakshaving application, for service maintenance...

  11. 49 CFR 195.59 - Abandonment or deactivation of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Abandonment or deactivation of facilities. 195.59... Abandonment or deactivation of facilities. For each abandoned offshore pipeline facility or each abandoned onshore pipeline facility that crosses over, under or through a commercially navigable waterway, the last...

  12. 9 CFR 3.76 - Indoor housing facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 1 2011-01-01 2011-01-01 false Indoor housing facilities. 3.76... Transportation of Nonhuman Primates 2 Facilities and Operating Standards § 3.76 Indoor housing facilities. (a) Heating, cooling, and temperature. Indoor housing facilities must be sufficiently heated and cooled when...

  13. ABR - Home

    Science.gov Websites

    Argonne National Laboratory Applied Battery Research for Transportation Program DOE Logo Home ; ABR > About ABR Projects News cell fabrication faciity posttest facility MERF Cell Fabrication Facility Post-Test Facility Materials Engineering Research Facility Battery News Recent Reports Funding

  14. The data facility of the Airborne Visible/Infrared Imaging Spectrometer (AVIRIS)

    NASA Technical Reports Server (NTRS)

    Nielsen, Pia J.; Green, Robert O.; Murray, Alex T.; Eng, Bjorn T.; Novack, H. Ian; Solis, Manuel; Olah, Martin

    1993-01-01

    AVIRIS operations at the Jet Propulsion Laboratory include a significant data task. The AVIRIS data facility is responsible for data archiving, data calibration, quality monitoring and distribution. Since 1987, the data facility has archived over one terabyte of AVIRIS data and distributed these data to science investigators as requested. In this paper we describe recent improvements in the AVIRIS data facility.

  15. Improving communications within the Virginia Department of Transportation : final report : a report to Assistant Commissioner Albert W. Coates, Jr. and the employee communications task force.

    DOT National Transportation Integrated Search

    1987-01-01

    As part of the efforts of an employee task force appointed to seek ways of improving communications within the Virginia Department of Transportation, nine focus group meetings were held for departmental employees. Participants were separated into the...

  16. Coordination between airway facilities specialists and air traffic personnel.

    DOT National Transportation Integrated Search

    2002-04-01

    Airway Facilities (AF) is responsible for providing services and conducting operations that deliver the highest possible levels of National Airspace System (NAS) safety and efficiency. To accomplish this, AF specialists perform maintenance tasks for ...

  17. Collaborative Russian-US work in nuclear material protection, control and accounting at the Institute of Physics and Power Engineering. 2: Extension to additional facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kuzin, V.V.; Pshakin, G.M.; Belov, A.P.

    1996-12-31

    During 1995, collaborative Russian-US nuclear material protection, control, and accounting (MPC and A) tasks at the Institute of Physics and Power Engineering (IPPE) in Obninsk, Russia focused on improving the protection of nuclear materials at the BFS Fast Critical Facility. BFS has tens of thousands of fuel disks containing highly enriched uranium and weapons-grade plutonium that are used to simulate the core configurations of experimental reactors in two critical assemblies. Completed tasks culminated in demonstrations of newly implemented equipment (Russian and US) and methods that enhanced the MPC and A at BFS through computerized accounting, nondestructive inventory verification measurements, personnelmore » identification and access control, physical inventory taking, physical protection, and video surveillance. The collaborative work with US Department of Energy national laboratories is now being extended. In 1996 additional tasks to improve MPC and A have been implemented at BFS, the Technological Laboratory for Fuel Fabrication (TLFF) the Central Storage Facility (CSF), and for the entire site. The TLFF reclads BFS uranium metal fuel disks (process operations and transfers of fissile material). The CSF contains many different types of nuclear material. MPC and A at these additional facilities will be integrated with that at BFS as a prototype site-wide approach. Additional site-wide tasks encompass communications and tamper-indicating devices. Finally, new storage alternatives are being implemented that will consolidate the more attractive nuclear materials in a better-protected nuclear island. The work this year represents not just the addition of new facilities and the site-wide approach, but the systematization of the MPC and A elements that are being implemented as a first step and the more comprehensive ones planned.« less

  18. 9 CFR 3.1 - Housing facilities, general.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.1 Housing facilities, general. (a) Structure; construction. Housing facilities for dogs and cats must be designed and constructed so that they... apply only to live dogs and cats, unless stated otherwise. (b) Condition and site. Housing facilities...

  19. 9 CFR 3.1 - Housing facilities, general.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.1 Housing facilities, general. (a) Structure; construction. Housing facilities for dogs and cats must be designed and constructed so that they... apply only to live dogs and cats, unless stated otherwise. (b) Condition and site. Housing facilities...

  20. Developing public health performance measures to capture the effects of transportation facilities on multiple public health outcomes.

    DOT National Transportation Integrated Search

    2016-04-15

    Increasingly, federal transportation and public health agencies are working together to identify : transportation investments that improve public health. Investments in transportation : infrastructure represent one method to utilize transportation to...

  1. Sociospatial distribution of access to facilities for moderate and vigorous intensity physical activity in Scotland by different modes of transport

    PubMed Central

    2012-01-01

    Background People living in neighbourhoods of lower socioeconomic status have been shown to have higher rates of obesity and a lower likelihood of meeting physical activity recommendations than their more affluent counterparts. This study examines the sociospatial distribution of access to facilities for moderate or vigorous intensity physical activity in Scotland and whether such access differs by the mode of transport available and by Urban Rural Classification. Methods A database of all fixed physical activity facilities was obtained from the national agency for sport in Scotland. Facilities were categorised into light, moderate and vigorous intensity activity groupings before being mapped. Transport networks were created to assess the number of each type of facility accessible from the population weighted centroid of each small area in Scotland on foot, by bicycle, by car and by bus. Multilevel modelling was used to investigate the distribution of the number of accessible facilities by small area deprivation within urban, small town and rural areas separately, adjusting for population size and local authority. Results Prior to adjustment for Urban Rural Classification and local authority, the median number of accessible facilities for moderate or vigorous intensity activity increased with increasing deprivation from the most affluent or second most affluent quintile to the most deprived for all modes of transport. However, after adjustment, the modelling results suggest that those in more affluent areas have significantly higher access to moderate and vigorous intensity facilities by car than those living in more deprived areas. Conclusions The sociospatial distributions of access to facilities for both moderate intensity and vigorous intensity physical activity were similar. However, the results suggest that those living in the most affluent neighbourhoods have poorer access to facilities of either type that can be reached on foot, by bicycle or by bus than those living in less affluent areas. This poorer access from the most affluent areas appears to be reversed for those with access to a car. PMID:22568969

  2. 9 CFR 3.25 - Facilities, general.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... WELFARE STANDARDS Specifications for the Humane Handling, Care, Treatment, and Transportation of Guinea Pigs and Hamsters Facilities and Operating Standards § 3.25 Facilities, general. (a) Structural strength. Indoor and outdoor housing facilities for guinea pigs or hamsters shall be structurally sound and...

  3. Pocket facts 2010 : the Swedish Transport Administration, railways, roads, traffic and transports

    DOT National Transportation Integrated Search

    2010-06-01

    The Swedish Transport Administration is responsible : for the long-term planning of the transport : system for road, rail, shipping and aviation. : Our task is to develop an efficient and sustainable : transport system from a perspective that : encom...

  4. National Transportation Atlas Databases : 1998

    DOT National Transportation Integrated Search

    1998-01-01

    The North American Transportation Atlas Data - 1998 (NORTAD) is a set of : geographic data sets for transportation facilities in Canada, Mexico, and the United : States. These data sets include geospatial information for transportation modal networks...

  5. Minnesota Bicycle transportation planning and design guidelines

    DOT National Transportation Integrated Search

    1996-06-17

    The emphasis now being placed on bicycle transportation requires an understanding of bicycles, bicyclists, and transportation facilities. The bicycle, when adequately planned for and used, plays an important part in the overall transportation system....

  6. 49 CFR 605.12 - Use of project equipment.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., facilities or equipment funded under the Acts. A grantee or operator may, however, use such buses, facilities... 49 Transportation 7 2010-10-01 2010-10-01 false Use of project equipment. 605.12 Section 605.12..., DEPARTMENT OF TRANSPORTATION SCHOOL BUS OPERATIONS School Bus Agreements § 605.12 Use of project equipment...

  7. Tents and Shelters

    DTIC Science & Technology

    2010-07-15

    Electromagnetic Interference ( EMI ), Transportability, Environmental, Human Factors Engineering (HFE), Reliability, Availability and Maintainability (RAM), and...vehicles and trailers to store, protect, and secure equipment, tools, and other theft-prone items. CBCs are designed not to interfere with the carrier’s...Transportability Test Facility. d. Electromagnetic Interference ( EMI ) Test Facility. e. Areas capable of conducting Blackout, Sound, Sand and Dust tests

  8. An analysis of the benefits of using underground tanks for the storage of stormwater runoff generated at Virginia Department of Transportation maintenance facilities.

    DOT National Transportation Integrated Search

    2017-06-01

    The Virginia Department of Transportation (VDOT) collects millions of gallons of runoff at its nearly 300 salt storage : facilities each year, with some portion of this water being reused for the generation of salt brine. Storing this collected storm...

  9. Safety Information, Transportation & Public Facilities, State of Alaska

    Science.gov Websites

    Department of Transportation & Public Facilities/ Safety Information Search DOT&PF State of Alaska DOT&PF> Safety Information DOT&PF Safety Information link to 511 511.alaska.gov - Traveler Information link to AHSO Alaska Highway Safety Office link to HSIP Highway Safety Improvement Program link to

  10. Characterization of stormwater at selected South Carolina Department of Transportation maintenance yard and section shed facilities in Ballentine, Conway, and North Charleston, South Carolina, 2010-2012.

    DOT National Transportation Integrated Search

    2013-01-01

    The purpose of this report is to characterize the : concentration, load, and yield of selected water-quality constituents transported by stormwater from SCDOT section shed : and maintenance yard facilities. From March 2010 to January 2012, storm samp...

  11. REPORT ON THE HOMELAND SECURITY WORKSHOP ON TRANSPORT AND DISPOSAL OF WASTES FROM FACILITIES CONTAMINATED WITH CHEMICAL AND BIOLOGICAL AGENTS

    EPA Science Inventory

    This report summarizes discussions from the "Homeland Security Workshop on Transport and Disposal of Wastes From Facilities Contaminated With Chemical or Biological Agents." The workshop was held on May 28-30, 2003, in Cincinnati, Ohio, and its objectives were to:

    .Documen...

  12. 76 FR 43356 - Evaluations of Explosions Postulated To Occur at Nearby Facilities and on Transportation Routes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-20

    ... the ``Regulatory Guides'' collection of the NRC's Library at http://www.nrc.gov/reading-rm/doc... NUCLEAR REGULATORY COMMISSION [NRC-2011-0152] Evaluations of Explosions Postulated To Occur at..., ``Evaluations of Explosions Postulated to Occur at Nearby Facilities and on Transportation Routes Near Nuclear...

  13. The Sandia transportable triggered lightning instrumentation facility

    NASA Technical Reports Server (NTRS)

    Schnetzer, George H.; Fisher, Richard J.

    1991-01-01

    Development of the Sandia Transportable Triggered Lightning Instrumentation Facility (SATTLIF) was motivated by a requirement for the in situ testing of a munitions storage bunker. Transfer functions relating the incident flash currents to voltages, currents, and electromagnetic field values throughout the structure will be obtained for use in refining and validating a lightning response computer model of this type of structure. A preliminary shakedown trial of the facility under actual operational conditions was performed during summer of 1990 at the Kennedy Space Center's (KSC) rocket-triggered lightning test site. A description is given of the SATTLIF, which is readily transportable on a single flatbed truck of by aircraft, and its instrumentation for measuring incident lightning channel currents and the responses of the systems under test. Measurements of return-stroke current peaks obtained with the SATTLIF are presented. Agreement with data acquired on the same flashes with existing KSC instrumentation is, on average, to within approximately 7 percent. Continuing currents were measured with a resolution of approximately 2.5 A. This field trial demonstrated the practicality of using a transportable triggered lightning facility for specialized test applications.

  14. FTOOLS: A FITS Data Processing and Analysis Software Package

    NASA Astrophysics Data System (ADS)

    Blackburn, J. Kent; Greene, Emily A.; Pence, William

    1993-05-01

    FTOOLS, a highly modular collection of utilities for processing and analyzing data in the FITS (Flexible Image Transport System) format, has been developed in support of the HEASARC (High Energy Astrophysics Research Archive Center) at NASA's Goddard Space Flight Center. Each utility performs a single simple task such as presentation of file contents, extraction of specific rows or columns, appending or merging tables, binning values in a column or selecting subsets of rows based on a boolean expression. Individual utilities can easily be chained together in scripts to achieve more complex operations such as the generation and displaying of spectra or light curves. The collection of utilities provides both generic processing and analysis utilities and utilities common to high energy astrophysics data sets. The FTOOLS software package is designed to be both compatible with IRAF and completely stand alone in a UNIX or VMS environment. The user interface is controlled by standard IRAF parameter files. The package is self documenting through the IRAF help facility and a stand alone help task. Software is written in ANSI C and FORTRAN to provide portability across most computer systems. The data format dependencies between hardware platforms are isolated through the FITSIO library package.

  15. Self mobile space manipulator project

    NASA Technical Reports Server (NTRS)

    Brown, H. Ben; Friedman, Mark; Xu, Yangsheng; Kanade, Takeo

    1992-01-01

    A relatively simple, modular, low mass, low cost robot is being developed for space EVA that is large enough to be independently mobile on a space station or platform exterior, yet versatile enough to accomplish many vital tasks. The robot comprises two long flexible links connected by a rotary joint, with 2-DOF 'wrist' joints and grippers at each end. It walks by gripping pre-positioned attachment points, such as trusswork nodes, and alternately shifting its base of support from one foot (gripper) to the other. The robot can perform useful tasks such as visual inspection, material transport, and light assembly by manipulating objects with one gripper, while stabilizing itself with the other. At SOAR '90, we reported development of 1/3 scale robot hardware, modular trusswork to serve as a locomotion substrate, and a gravity compensation system to allow laboratory tests of locomotion strategies on the horizontal face of the trusswork. In this paper, we report on project progress including the development of: (1) adaptive control for automatic adjustment to loads; (2) enhanced manipulation capabilities; (3) machine vision, including the use of neural nets, to guide autonomous locomotion; (4) locomotion between orthogonal trusswork faces; and (5) improved facilities for gravity compensation and telerobotic control.

  16. MPLM Donatello is offloaded at the SLF

    NASA Technical Reports Server (NTRS)

    2001-01-01

    At the Shuttle Landing Facility, workers in cherry pickers (left and right) help direct the offloading of the Italian Space Agency's Multi- Purpose Logistics Module Donatello from the Airbus '''Beluga''' air cargo plane that brought it from the factory of Alenia Aerospazio in Turin, Italy. The third of three for the International Space Station, the module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.

  17. MPLM Donatello is offloaded at the SLF

    NASA Technical Reports Server (NTRS)

    2001-01-01

    At the Shuttle Landing Facility, cranes are poised to help offload the Italian Space Agency's Multi- Purpose Logistics Module Donatello from the Airbus '''Beluga''' air cargo plane that brought it from the factory of Alenia Aerospazio in Turin, Italy. The third of three for the International Space Station, the module will be transported to the Space Station Processing Facility for processing. Among the activities for the payload test team are integrated electrical tests with other Station elements in the SSPF, leak tests, electrical and software compatibility tests with the Space Shuttle (using the Cargo Integrated Test equipment) and an Interface Verification Test once the module is installed in the Space Shuttle's payload bay at the launch pad. The most significant mechanical task to be performed on Donatello in the SSPF is the installation and outfitting of the racks for carrying the various experiments and cargo.

  18. Use of satellite telecommunications for telemedicine

    NASA Technical Reports Server (NTRS)

    Tamkovich, Gennady

    1991-01-01

    The use of space telecommunications facilities in the interests of medicine should establish a reliable and timely connection between the specialists involved and access for each of them to information sources the need. Since a certain global-scale program should be implemented for this goal to be achieved, one of the top-priority tasks is to determine appropriate orbital facilities for telecommunications as well as appropriate areas and countries for them, outlining the territories where portable data receive/transport records can be placed and stations that are cheap and simple enough to operate can be stored. Eventually the satellite telecommunications system should encourage health workers to unite in a world community on the basis of a regular and efficient information exchange with the goal of protecting the health of man and the peace of Earth. This goal could only be achieved by gradually removing differences in the domain of medical education and information in different regions over the globe, by providing a possibility of rapid and coordinated access to the information on medical problems of interest on the global scale, as well as by coordinating the discussion and solution of all problems associated with the development and progress of the satellite communications system.

  19. User fee exemptions are not enough: out-of-pocket payments for 'free' delivery services in rural Tanzania.

    PubMed

    Kruk, Margaret E; Mbaruku, Godfrey; Rockers, Peter C; Galea, Sandro

    2008-12-01

    To identify the main drivers of costs of facility delivery and the financial consequences for households among rural women in Tanzania, a country with a policy of delivery fee exemptions. We selected a representative sample of households in a rural district in western Tanzania. Women who given birth within 5 years were asked about payments for doctor's/nurse's fees, drugs, non-medical supplies, medical tests, maternity waiting home, transport and other expenses. Wealth was assessed using a household asset index. We estimated the proportion of women who cut down on spending or borrowed money/sold household items to pay for delivery in each wealth group. In all, 73.3% of women with facility delivery reported having made out-of-pocket payments for delivery-related costs. The average cost was 6272 Tanzanian shillings (TZS), [95% Confidence Interval (CI): 4916, 7628] or 5.0 United States dollars. Transport costs (53.6%) and provider fees (26.6%) were the largest cost components in government facilities. Deliveries in mission facilities were twice as expensive as those in government facilities. Nearly half (48.3%) of women reported cutting down on spending or borrowing money/selling household assets to pay for delivery, with the poor reporting this most frequently. Out-of-pocket payments for facility delivery were substantial and were driven by high transport costs, unofficial provider payments, and preference for mission facilities, which levy user charges. Novel approaches to financing maternal health services, such as subsidies for transport and care from private providers, are required to reduce the cost barriers to attended delivery.

  20. An Overview of the NIRA Status

    NASA Technical Reports Server (NTRS)

    Hughes, William

    2003-01-01

    The NASA Glenn Research Center (GRC) has been tasked by NASA JSC's ISS Payloads Office to perform the NIRA (Non-Isolated Rack Assessment) microgravity prediction analysis task for the International Space Station. Previously, the NIRA analysis task had been performed by Boeing/Houston. Boeing's last NIRA analysis was released in 1999 and was denoted as "NIRA 99." GRC is currently close to completing our first full-NIRA analysis (encompassing the frequency range from 0 to 50 Hz) to be released as "NIRA 2003." This presentation will focus on describing the NIRA analysis, the transition of this analysis task from Boeing to GRC, and the current status and schedule for release of the NIRA 2003 results. Additionally, the results obtained from a mini-NIRA analysis requested by ESA and completed by GRC in the Spring of 2003 will be shown. This mini-analysis focused solely on predicting the microgravity environment at the COF-EPF (Columbus Orbiting Facility - External Payload Facility).

  1. The influences of Taiwan's National Health Insurance on women's choice of prenatal care facility: Investigation of differences between rural and non-rural areas

    PubMed Central

    Chen, Likwang; Chen, Chi-Liang; Yang, Wei-Chih

    2008-01-01

    Background Taiwan's National Health Insurance (NHI), implemented in 1995, substantially increased the number of health care facilities that can deliver free prenatal care. Because of the increase in such facilities, it is usually assumed that women would have more choices regarding prenatal care facilities and thus experience reduction in travel cost. Nevertheless, there has been no research exploring these issues in the literature. This study compares how Taiwan's NHI program may have influenced choice of prenatal care facility and perception regarding convenience in transportation for obtaining such care for women in rural and non-rural areas in Taiwan. Methods Based on data collected by a national survey conducted by Taiwan's National Health Research Institutes (NHRI) in 2000, we tried to compare how women chose prenatal care facility before and after Taiwan's National Health Insurance program was implemented. Basing our analysis on how women answered questionnaire items regarding "the type of major health care facility used and convenience of transportation to and from prenatal care facility," we investigated whether there were disparities in how women in rural and non-rural areas chose prenatal care facilities and felt about the transportation, and whether the NHI had different influences for the two groups of women. Results After NHI, women in rural areas were more likely than before to choose large hospitals for prenatal care services. For women in rural areas, the relative probability of choosing large hospitals to choosing non-hospital settings in 1998–1999 was about 6.54 times of that in 1990–1992. In contrast, no such change was found in women in non-rural areas. For a woman in a non-rural area, she was significantly more likely to perceive the transportation to and from prenatal care facilities to be very convenient between 1998 and 1999 than in the period between 1990 and 1992. No such improvement was found for women in rural areas. Conclusion We concluded that women in rural areas were more likely to seek prenatal care in large hospitals, but were not more likely to perceive very convenient transportation to and from prenatal care facilities in the late 1990s than in the early 1990s. In contrast, women in non-rural areas did not have a stronger tendency to seek prenatal care in large hospitals in the late 1990s than in earlier periods. In addition, they did perceive an improvement in transportation for acquiring prenatal care in the late 1990s. More efforts should be made to reduce these disparities. PMID:18373869

  2. United Space Alliance LLC Parachute Refurbishment Facility Model

    NASA Technical Reports Server (NTRS)

    Esser, Valerie; Pessaro, Martha; Young, Angela

    2007-01-01

    The Parachute Refurbishment Facility Model was created to reflect the flow of hardware through the facility using anticipated start and delivery times from a project level IV schedule. Distributions for task times were built using historical build data for SFOC work and new data generated for CLV/ARES task times. The model currently processes 633 line items from 14 SFOC builds for flight readiness, 16 SFOC builds returning from flight for defoul, wash, and dry operations, 12 builds for CLV manufacturing operations, and 1 ARES 1X build. Modeling the planned workflow through the PRF is providing a reliable way to predict the capability of the facility as well as the manpower resource need. Creating a real world process allows for real world problems to be identified and potential workarounds to be implemented in a safe, simulated world before taking it to the next step, implementation in the real world.

  3. Multimodal transport and TransLoad facilities in Arkansas.

    DOT National Transportation Integrated Search

    2015-01-01

    National Priorities consist of building a clean and ecient 21st century : transportation sector, and Multimodal Transportation is one of ve : Transportation System Eciency strategies at the US Department of Energy. Six : locomotives co...

  4. Statewide Transportation Plan - Intermodalism ... Bringing Transportation Together

    DOT National Transportation Integrated Search

    1995-05-01

    Georgia has benefited from a comprehensive multimodal transportation network. The availability of road, air, rail and port transportation facilities has been a magnet for business development and economic activity. The ability to connect goods to mar...

  5. NASA's Role in Aeronautics: A Workshop. Volume III - Transport Aircraft.

    ERIC Educational Resources Information Center

    National Academy of Sciences - National Research Council, Washington, DC. Assembly of Engineering.

    The central task of a 1980 workshop on the role of the National Aeronautics and Space Administration (NASA) in aeronautics was to examine the relationship of NASA's research capabilities to the state of U.S. aviation and to make recommendations about NASA's future role in aeronautics. The specific task of the Panel on Transport Aircraft was to…

  6. Harbors.

    DTIC Science & Technology

    1981-07-01

    CONTRACT OR GRANT NUMBER(e) Naval Facilities Engineering Command 200 Stovall Street r Alexandria, VA 22332 (Code 0453) s. PERFORMING ORGANIZATION NAME...AND ADDRESS 10. PROGRAM ELEMENT. PROJECT. TASK • Naval Facilities Engineering Command AREA & WORK UNIT NUMBERS < 200 Stovall Street Engineering and...Design Alexandria, VA 22332 It. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE ~ Naval Facilities Engineering Command (Code10432) July 1981 200

  7. Geographic Access Modeling of Emergency Obstetric and Neonatal Care in Kigoma Region, Tanzania: Transportation Schemes and Programmatic Implications.

    PubMed

    Chen, Yi No; Schmitz, Michelle M; Serbanescu, Florina; Dynes, Michelle M; Maro, Godson; Kramer, Michael R

    2017-09-27

    Access to transportation is vital to reducing the travel time to emergency obstetric and neonatal care (EmONC) for managing complications and preventing adverse maternal and neonatal outcomes. This study examines the distribution of travel times to EmONC in Kigoma Region, Tanzania, using various transportation schemes, to estimate the proportion of live births (a proxy indicator of women needing delivery care) with poor geographic access to EmONC services. The 2014 Reproductive Health Survey of Kigoma Region identified 4 primary means of transportation used to travel to health facilities: walking, cycling, motorcycle, and 4-wheeled motor vehicle. A raster-based travel time model was used to map the 2-hour travel time catchment for each mode of transportation. Live birth density distributions were aggregated by travel time catchments, and by administrative council, to estimate the proportion of births with poor access. Of all live births in Kigoma Region, 13% occurred in areas where women can reach EmONC facilities within 2 hours on foot, 33% in areas that can be reached within 2 hours only by motorized vehicles, and 32% where it is impossible to reach EmONC facilities within 2 hours. Over 50% of births in 3 of the 8 administrative councils had poor estimated access. In half the councils, births with poor access could be reduced to no higher than 12% if all female residents had access to motorized vehicles. Significant differences in geographic access to EmONC in Kigoma Region, Tanzania, were observed both by location and by primary transportation type. As most of the population may only have good EmONC access when using mechanized or motorized vehicles, bicycles and motorcycles should be incorporated into the health transportation strategy. Collaboration between private transportation sectors and obstetric service providers could improve access to EmONC services among most populations. In areas where residents may not access EmONC facilities within 2 hours regardless of the type of transportation used, upgrading EmONC capacity among nearby non-EmONC facilities may be required to improve accessibility. © Chen Y, Schmitz, et al.

  8. Geographic Access Modeling of Emergency Obstetric and Neonatal Care in Kigoma Region, Tanzania: Transportation Schemes and Programmatic Implications

    PubMed Central

    Chen, Yi No; Schmitz, Michelle M; Serbanescu, Florina; Dynes, Michelle M; Maro, Godson; Kramer, Michael R

    2017-01-01

    ABSTRACT Background: Access to transportation is vital to reducing the travel time to emergency obstetric and neonatal care (EmONC) for managing complications and preventing adverse maternal and neonatal outcomes. This study examines the distribution of travel times to EmONC in Kigoma Region, Tanzania, using various transportation schemes, to estimate the proportion of live births (a proxy indicator of women needing delivery care) with poor geographic access to EmONC services. Methods: The 2014 Reproductive Health Survey of Kigoma Region identified 4 primary means of transportation used to travel to health facilities: walking, cycling, motorcycle, and 4-wheeled motor vehicle. A raster-based travel time model was used to map the 2-hour travel time catchment for each mode of transportation. Live birth density distributions were aggregated by travel time catchments, and by administrative council, to estimate the proportion of births with poor access. Results: Of all live births in Kigoma Region, 13% occurred in areas where women can reach EmONC facilities within 2 hours on foot, 33% in areas that can be reached within 2 hours only by motorized vehicles, and 32% where it is impossible to reach EmONC facilities within 2 hours. Over 50% of births in 3 of the 8 administrative councils had poor estimated access. In half the councils, births with poor access could be reduced to no higher than 12% if all female residents had access to motorized vehicles. Conclusion: Significant differences in geographic access to EmONC in Kigoma Region, Tanzania, were observed both by location and by primary transportation type. As most of the population may only have good EmONC access when using mechanized or motorized vehicles, bicycles and motorcycles should be incorporated into the health transportation strategy. Collaboration between private transportation sectors and obstetric service providers could improve access to EmONC services among most populations. In areas where residents may not access EmONC facilities within 2 hours regardless of the type of transportation used, upgrading EmONC capacity among nearby non-EmONC facilities may be required to improve accessibility. PMID:28839113

  9. Orion EM-1 Crew Module Structural Test Article loaded onto Guppy

    NASA Image and Video Library

    2017-04-25

    The Orion Exploration Mission-1 (EM-1) structural test article, secured inside its transport container, is lifted up by crane from its transport vehicle at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The test article will be loaded into NASA's Super Guppy aircraft, in view at left, and transported to Lockheed Martin's Denver facility for testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission.

  10. 49 CFR 37.63-37.69 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false [Reserved] 37.63-37.69 Section 37.63-37.69 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Transportation Facilities §§ 37.63-37.69 [Reserved] ...

  11. 49 CFR 37.55 - Intercity rail station accessibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Intercity rail station accessibility. 37.55 Section 37.55 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Transportation Facilities § 37.55 Intercity rail station accessibility...

  12. Asphyxiation Incidents by Hydrogen Sulfide at Manure Storage Facilities of Swine Livestock Farms in Korea.

    PubMed

    Park, Jihoon; Kang, Taesun; Jin, Suhyun; Heo, Yong; Kim, Kyungran; Lee, Kyungsuk; Tsai, Perngjy; Yoon, Chungsik

    2016-01-01

    Livestock workers are involved in a variety of tasks, such as caring for animals, maintaining the breeding facilities, cleaning, and manure handling, and are exposed to health and safety risks. Hydrogen sulfide is considered the most toxic by-product of the manure handling process at livestock facilities. Except for several reports in developed countries, the statistics and cause of asphyxiation incidents in farms have not been collected and reported systematically, although the number of these incidents is expected to increase in developing and underdeveloped countries. In this study, the authors compiled the cases of work-related asphyxiation incidents at livestock manure storage facilities and analyzed the main causes. In this survey, a total of 17 incidents were identified through newspapers or online searches and public reports. Thirty workers died and eight were injured due to work-related tasks and rescue attempts from 1998 to 2013 in Korea. Of the 30 fatalities, 18 occurred during manure handling/maintenance tasks and 12 during rescue attempts. All incidents except for one case occurred during the warm season from the late spring (April) to early autumn (September) when manure is likely to decompose rapidly. It is important to train employees involved in the operation of the facilities (i.e., owners, managers, employees) regarding the appropriate prevention strategies for confined space management, such as hazard identification before entry, periodical facility inspection, restriction of unnecessary access, proper ventilation, and health and safety. Sharing information or case reports on previous incidents could also help prevent similar cases from occurring and reduce the number of fatalities and injuries.

  13. UFD Storage and Transportation - Transportation Working Group Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Maheras, Steven J.; Ross, Steven B.

    2011-08-01

    The Used Fuel Disposition (UFD) Transportation Task commenced in October 2010. As its first task, Pacific Northwest National Laboratory (PNNL) compiled a list of structures, systems, and components (SSCs) of transportation systems and their possible degradation mechanisms during extended storage. The list of SSCs and the associated degradation mechanisms [known as features, events, and processes (FEPs)] were based on the list of used nuclear fuel (UNF) storage system SSCs and degradation mechanisms developed by the UFD Storage Task (Hanson et al. 2011). Other sources of information surveyed to develop the list of SSCs and their degradation mechanisms included references suchmore » as Evaluation of the Technical Basis for Extended Dry Storage and Transportation of Used Nuclear Fuel (NWTRB 2010), Transportation, Aging and Disposal Canister System Performance Specification, Revision 1 (OCRWM 2008), Data Needs for Long-Term Storage of LWR Fuel (EPRI 1998), Technical Bases for Extended Dry Storage of Spent Nuclear Fuel (EPRI 2002), Used Fuel and High-Level Radioactive Waste Extended Storage Collaboration Program (EPRI 2010a), Industry Spent Fuel Storage Handbook (EPRI 2010b), and Transportation of Commercial Spent Nuclear Fuel, Issues Resolution (EPRI 2010c). SSCs include items such as the fuel, cladding, fuel baskets, neutron poisons, metal canisters, etc. Potential degradation mechanisms (FEPs) included mechanical, thermal, radiation and chemical stressors, such as fuel fragmentation, embrittlement of cladding by hydrogen, oxidation of cladding, metal fatigue, corrosion, etc. These degradation mechanisms are discussed in Section 2 of this report. The degradation mechanisms have been evaluated to determine if they would be influenced by extended storage or high burnup, the need for additional data, and their importance to transportation. These categories were used to identify the most significant transportation degradation mechanisms. As expected, for the most part, the transportation importance was mirrored by the importance assigned by the UFD Storage Task. A few of the more significant differences are described in Section 3 of this report« less

  14. 23 CFR 810.100 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.100...), and 149, which authorize various highway public mass transportation improvements and special use...

  15. 49 CFR 193.2003 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false [Reserved] 193.2003 Section 193.2003 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  16. 49 CFR 193.2617 - Repairs.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Repairs. 193.2617 Section 193.2617 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  17. 49 CFR 193.2015 - [Reserved

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false [Reserved] 193.2015 Section 193.2015 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  18. 49 CFR 193.2517 - Purging.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Purging. 193.2517 Section 193.2517 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  19. 49 CFR 193.2401 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Scope. 193.2401 Section 193.2401 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  20. 49 CFR 193.2603 - General.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false General. 193.2603 Section 193.2603 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  1. 49 CFR 193.2505 - Cooldown.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Cooldown. 193.2505 Section 193.2505 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  2. 49 CFR 193.2501 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Scope. 193.2501 Section 193.2501 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  3. 49 CFR 193.2301 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Scope. 193.2301 Section 193.2301 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  4. 49 CFR 193.2601 - Scope.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Scope. 193.2601 Section 193.2601 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  5. 49 CFR 193.2011 - Reporting.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Reporting. 193.2011 Section 193.2011 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  6. 49 CFR 665.25 - Transportation of vehicle.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Transportation of vehicle. 665.25 Section 665.25..., DEPARTMENT OF TRANSPORTATION BUS TESTING Operations § 665.25 Transportation of vehicle. A manufacturer shall be responsible for transporting its vehicle to and from the bus testing facility at the beginning and...

  7. 49 CFR 665.25 - Transportation of vehicle.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Transportation of vehicle. 665.25 Section 665.25..., DEPARTMENT OF TRANSPORTATION BUS TESTING Operations § 665.25 Transportation of vehicle. A manufacturer shall be responsible for transporting its vehicle to and from the bus testing facility at the beginning and...

  8. KENNEDY SPACE CENTER, FLA. - STS-114 Mission Commander Eileen Collins looks over flight equipment in the Orbiter Processing Facility, along with Glenda Laws, EVA Task Leader, with United Space Alliance at Johnson Space Center. The STS-114 crew is at KSC to take part in crew equipment and orbiter familiarization.

    NASA Image and Video Library

    2003-10-30

    KENNEDY SPACE CENTER, FLA. - STS-114 Mission Commander Eileen Collins looks over flight equipment in the Orbiter Processing Facility, along with Glenda Laws, EVA Task Leader, with United Space Alliance at Johnson Space Center. The STS-114 crew is at KSC to take part in crew equipment and orbiter familiarization.

  9. Task 21 - Development of Systems Engineering Applications for Decontamination and Decommissioning Activities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Erickson, T.A.

    1998-11-01

    The objectives of this task are to: Develop a model (paper) to estimate the cost and waste generation of cleanup within the Environmental Management (EM) complex; Identify technologies applicable to decontamination and decommissioning (D and D) operations within the EM complex; Develop a database of facility information as linked to project baseline summaries (PBSs). The above objectives are carried out through the following four subtasks: Subtask 1--D and D Model Development, Subtask 2--Technology List; Subtask 3--Facility Database, and Subtask 4--Incorporation into a User Model.

  10. Project FARE task III report : urban mass transportation industry reporting system design : interim task III report for November 1972-June 1973 period. Part I - Task summary.

    DOT National Transportation Integrated Search

    1973-06-01

    This report contains a description of the proposed uniform reporting system for the urban mass transit industry. It is presented in four volumes: Part I - Task Summary contains a description of how Task III was accomplished and the conclusions and re...

  11. 25 CFR 170.813 - When can access to IRR transportation facilities be restricted?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false When can access to IRR transportation facilities be restricted? 170.813 Section 170.813 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.813 When can access to IRR...

  12. General view from outside the Orbiter Processing Facility at the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    General view from outside the Orbiter Processing Facility at the Kennedy Space Center with the bay doors open as the Orbiter Discovery is atop the transport vehicle prepared to be moved over to the Vehicle Assembly Building. - Space Transportation System, Orbiter Discovery (OV-103), Lyndon B. Johnson Space Center, 2101 NASA Parkway, Houston, Harris County, TX

  13. 25 CFR 170.443 - How can a tribe list a proposed transportation facility in the IRR Inventory?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false How can a tribe list a proposed transportation facility in the IRR Inventory? 170.443 Section 170.443 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian...

  14. 33 CFR 154.1225 - Specific response plan development and evaluation criteria and other requirements for fixed...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... transport animal fats or vegetable oils. 154.1225 Section 154.1225 Navigation and Navigable Waters COAST... MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1225 Specific response..., or transport animal fats or vegetable oils. (a) The owner or operator of a fixed facility that...

  15. 33 CFR 154.1225 - Specific response plan development and evaluation criteria and other requirements for fixed...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... transport animal fats or vegetable oils. 154.1225 Section 154.1225 Navigation and Navigable Waters COAST... MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1225 Specific response..., or transport animal fats or vegetable oils. (a) The owner or operator of a fixed facility that...

  16. 76 FR 30884 - Special Local Regulation; Kelley's Island Swim, Lake Erie; Kelley's Island, Lakeside, OH

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-27

    ...) Mail: Docket Management Facility (M-30), U.S. Department of Transportation, West Building Ground Floor... ``Search'' then click on the balloon shape in the ``Actions'' column. If you submit your comments by mail... Facility in Room W12-140 on the ground floor of the Department of Transportation West Building, 1200 New...

  17. 33 CFR 154.1225 - Specific response plan development and evaluation criteria and other requirements for fixed...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... transport animal fats or vegetable oils. 154.1225 Section 154.1225 Navigation and Navigable Waters COAST... MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1225 Specific response..., or transport animal fats or vegetable oils. (a) The owner or operator of a fixed facility that...

  18. 33 CFR 154.1225 - Specific response plan development and evaluation criteria and other requirements for fixed...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... transport animal fats or vegetable oils. 154.1225 Section 154.1225 Navigation and Navigable Waters COAST... MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1225 Specific response..., or transport animal fats or vegetable oils. (a) The owner or operator of a fixed facility that...

  19. 33 CFR 154.1225 - Specific response plan development and evaluation criteria and other requirements for fixed...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... transport animal fats or vegetable oils. 154.1225 Section 154.1225 Navigation and Navigable Waters COAST... MATERIAL IN BULK Response Plans for Animal Fats and Vegetable Oils Facilities § 154.1225 Specific response..., or transport animal fats or vegetable oils. (a) The owner or operator of a fixed facility that...

  20. 78 FR 7850 - Notice of Availability of Finding of No Significant Impact for the Proposed NOVA Chemicals Inc...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-04

    ... (the Line 20 Facilities), from natural gas transmission to natural gas liquids transportation service in order to transport natural gas liquids, principally ethane, from U.S. sources of supply to a... natural gas liquids service will return the Line 20 Facilities to the service for which a Presidential...

  1. Metropolitan transportation management center concepts of operation : a cross-cutting study : improving transportation network efficiency

    DOT National Transportation Integrated Search

    1999-10-01

    The implementor and operator of a regional transportation management center (TMC) face a challenging task. Operators of TMCsthe primary point of coordination for managing transportation resourcestypically control millions of dollars of intellig...

  2. Sustainable Cooperative Robotic Technologies for Human and Robotic Outpost Infrastructure Construction and Maintenance

    NASA Technical Reports Server (NTRS)

    Stroupe, Ashley W.; Okon, Avi; Robinson, Matthew; Huntsberger, Terry; Aghazarian, Hrand; Baumgartner, Eric

    2004-01-01

    Robotic Construction Crew (RCC) is a heterogeneous multi-robot system for autonomous acquisition, transport, and precision mating of components in construction tasks. RCC minimizes resources constrained in a space environment such as computation, power, communication and, sensing. A behavior-based architecture provides adaptability and robustness despite low computational requirements. RCC successfully performs several construction related tasks in an emulated outdoor environment despite high levels of uncertainty in motions and sensing. Quantitative results are provided for formation keeping in component transport, precision instrument placement, and construction tasks.

  3. Assisted Living

    MedlinePlus

    ... Recreational activities Security Transportation How to Choose a Facility A good match between a facility and a resident's needs depends as much on the philosophy and services of the assisted living facility as it does on the quality of care. ...

  4. 49 CFR 37.59 - Differences in accessibility completion dates.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Differences in accessibility completion dates. 37.59 Section 37.59 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Transportation Facilities § 37.59 Differences in accessibility completion...

  5. 49 CFR 37.57 - Required cooperation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Required cooperation. 37.57 Section 37.57 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Transportation Facilities § 37.57 Required cooperation. An owner or person in control of an...

  6. 25 CFR 170.402 - What is the tribal role in transportation planning?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... transportation related meetings; (9) Performing transportation planning for operational and maintenance...

  7. 49 CFR 28.150 - Program accessibility: Existing facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Program accessibility: Existing facilities. 28.150....150 Program accessibility: Existing facilities. (a) General. The Department shall operate each program... Department to make each of its existing facilities accessible to and usable by individuals with handicaps; (2...

  8. 49 CFR 374.309 - Terminal facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 5 2010-10-01 2010-10-01 false Terminal facilities. 374.309 Section 374.309... REGULATIONS Adequacy of Intercity Motor Common Carrier Passenger Service § 374.309 Terminal facilities. (a... attendants and be regularly patrolled. (b) Outside facilities. At terminals and stations that are closed when...

  9. 14 CFR 65.41 - Skill requirements: Facility ratings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Skill requirements: Facility ratings. 65.41 Section 65.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... § 65.41 Skill requirements: Facility ratings. Each applicant for a facility rating at an air traffic...

  10. 14 CFR 65.41 - Skill requirements: Facility ratings.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Skill requirements: Facility ratings. 65.41 Section 65.41 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION... § 65.41 Skill requirements: Facility ratings. Each applicant for a facility rating at an air traffic...

  11. Sustainable Transport Systems: Linkages Between Environmental Issues, Public Transport, Non-Motorized Transport And Safety

    DOT National Transportation Integrated Search

    2000-10-01

    A sustainable transport system must provide mobility and accessibility to all urban residents in a safe and end environmentally friendly mode of transport. This is a complex and difficult task when the needs and demands of people belonging to differe...

  12. 23 CFR 810.104 - Applicability of other provisions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ....104 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway... carpools and vanpools. (3) Fringe and transportation corridor parking facilities or portions thereof which...

  13. 49 CFR 193.2321 - Nondestructive tests.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Nondestructive tests. 193.2321 Section 193.2321 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  14. 49 CFR 193.2509 - Emergency procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Emergency procedures. 193.2509 Section 193.2509 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  15. 49 CFR 193.2633 - Interference currents.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Interference currents. 193.2633 Section 193.2633 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  16. 49 CFR 193.2303 - Construction acceptance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Construction acceptance. 193.2303 Section 193.2303 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  17. 49 CFR 193.2609 - Support systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Support systems. 193.2609 Section 193.2609 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  18. 49 CFR 193.2611 - Fire protection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Fire protection. 193.2611 Section 193.2611 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  19. 49 CFR 193.2521 - Operating records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Operating records. 193.2521 Section 193.2521 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  20. 49 CFR 193.2637 - Remedial measures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Remedial measures. 193.2637 Section 193.2637 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  1. 49 CFR 193.2625 - Corrosion protection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Corrosion protection. 193.2625 Section 193.2625 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  2. 49 CFR 193.2607 - Foreign material.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Foreign material. 193.2607 Section 193.2607 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  3. 49 CFR 193.2605 - Maintenance procedures.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Maintenance procedures. 193.2605 Section 193.2605 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  4. 49 CFR 193.2519 - Communication systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Communication systems. 193.2519 Section 193.2519 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  5. The Line Operations Safety Audit Program: Transitioning From Flight Operations to Maintenance and Ramp Operations

    DTIC Science & Technology

    2011-09-01

    Transport Association ( ATA ) Maintenance & Ramp Human Factors Task Force committee members—we are deeply grateful for their contributions in the...6 Air Transport Association ( ATA ) Human Factors Task Force . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 Form Development...garnered many valuable les- sons, safety improvements, and significant returns on their investment. 1The FAA ATA Human Factors Taskforce has

  6. 49 CFR 599.401 - Requirements and limitations for disposal facilities that receive trade-in vehicles under the...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... facilities that receive trade-in vehicles under the CARS program. 599.401 Section 599.401 Transportation... facilities that receive trade-in vehicles under the CARS program. (a) The disposal facility must: (1) Not... or shredded, report the vehicle to NMVTIS as crushed or shredded. (b) The disposal facility may not...

  7. Results for the Fourth Quarter Calendar Year 2015 Tank 50H Salt Solution Sample

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Crawford, C.

    In this memorandum, the chemical and radionuclide contaminant results from the Fourth Quarter Calendar Year 2015 (CY15) sample of Tank 50H salt solution are presented in tabulated form. The Fourth Quarter CY15 Tank 50H samples were obtained on October 29, 2015 and received at Savannah River National Laboratory (SRNL) on October 30, 2015. The information from this characterization will be used by Defense Waste Processing Facility (DWPF) & Saltstone Facility Engineering for the transfer of aqueous waste from Tank 50H to the Salt Feed Tank in the Saltstone Production Facility, where the waste will be treated and disposed of inmore » the Saltstone Disposal Facility. This memorandum compares results, where applicable, to Saltstone Waste Acceptance Criteria (WAC) limits and targets. Data pertaining to the regulatory limits for Resource Conservation and Recovery Act (RCRA) metals will be documented at a later time per the Task Technical and Quality Assurance Plan (TTQAP) for the Tank 50H saltstone task. The chemical and radionuclide contaminant results from the characterization of the Fourth Quarter Calendar Year 2015 (CY15) sampling of Tank 50H were requested by SRR personnel and details of the testing are presented in the SRNL Task Technical and Quality Assurance Plan.« less

  8. National highway system connectors to freight facilities in the Delaware Valley region

    DOT National Transportation Integrated Search

    2001-10-01

    DVRPC conducted a study of important roadway connections between the National Highway System and 12 key intermodal freight terminals (or clusters of freight facilities) to assist the planning needs of the Delaware Valley Goods Movement Task Force.

  9. Space station systems technology study (add-on task). Volume 3: Technology advancement program plan

    NASA Technical Reports Server (NTRS)

    1985-01-01

    Program plans are given for an integrating controller for space station autonomy as well as for controls and displays. The technical approach, facility requirements and candidate facilities, development schedules, and resource requirements estimates are given.

  10. 49 CFR 1155.21 - Contents of application.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 8 2012-10-01 2012-10-01 false Contents of application. 1155.21 Section 1155.21 Transportation Other Regulations Relating to Transportation (Continued) SURFACE TRANSPORTATION BOARD, DEPARTMENT OF TRANSPORTATION RULES OF PRACTICE SOLID WASTE RAIL TRANSFER FACILITIES Procedures Governing Applications for a Land-Use-Exemption Permi...

  11. 49 CFR 1155.21 - Contents of application.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 8 2013-10-01 2013-10-01 false Contents of application. 1155.21 Section 1155.21 Transportation Other Regulations Relating to Transportation (Continued) SURFACE TRANSPORTATION BOARD, DEPARTMENT OF TRANSPORTATION RULES OF PRACTICE SOLID WASTE RAIL TRANSFER FACILITIES Procedures Governing Applications for a Land-Use-Exemption Permi...

  12. Advanced Reactors-Intermediate Heat Exchanger (IHX) Coupling: Theoretical Modeling and Experimental Validation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Utgikar, Vivek; Sun, Xiaodong; Christensen, Richard

    2016-12-29

    The overall goal of the research project was to model the behavior of the advanced reactorintermediate heat exchange system and to develop advanced control techniques for off-normal conditions. The specific objectives defined for the project were: 1. To develop the steady-state thermal hydraulic design of the intermediate heat exchanger (IHX); 2. To develop mathematical models to describe the advanced nuclear reactor-IHX-chemical process/power generation coupling during normal and off-normal operations, and to simulate models using multiphysics software; 3. To develop control strategies using genetic algorithm or neural network techniques and couple these techniques with the multiphysics software; 4. To validate themore » models experimentally The project objectives were accomplished by defining and executing four different tasks corresponding to these specific objectives. The first task involved selection of IHX candidates and developing steady state designs for those. The second task involved modeling of the transient and offnormal operation of the reactor-IHX system. The subsequent task dealt with the development of control strategies and involved algorithm development and simulation. The last task involved experimental validation of the thermal hydraulic performances of the two prototype heat exchangers designed and fabricated for the project at steady state and transient conditions to simulate the coupling of the reactor- IHX-process plant system. The experimental work utilized the two test facilities at The Ohio State University (OSU) including one existing High-Temperature Helium Test Facility (HTHF) and the newly developed high-temperature molten salt facility.« less

  13. Implications of system usability on intermodal facility design.

    DOT National Transportation Integrated Search

    2010-08-01

    Ensuring good design of intermodal transportation facilities is critical for effective and : satisfactory operation. Passenger use of the facilities is often hindered by inadequate space, a poor : layout, or lack of signage. This project aims to impr...

  14. Test Facilities and Experience on Space Nuclear System Developments at the Kurchatov Institute

    NASA Astrophysics Data System (ADS)

    Ponomarev-Stepnoi, Nikolai N.; Garin, Vladimir P.; Glushkov, Evgeny S.; Kompaniets, George V.; Kukharkin, Nikolai E.; Madeev, Vicktor G.; Papin, Vladimir K.; Polyakov, Dmitry N.; Stepennov, Boris S.; Tchuniyaev, Yevgeny I.; Tikhonov, Lev Ya.; Uksusov, Yevgeny I.

    2004-02-01

    The complexity of space fission systems and rigidity of requirement on minimization of weight and dimension characteristics along with the wish to decrease expenditures on their development demand implementation of experimental works which results shall be used in designing, safety substantiation, and licensing procedures. Experimental facilities are intended to solve the following tasks: obtainment of benchmark data for computer code validations, substantiation of design solutions when computational efforts are too expensive, quality control in a production process, and ``iron'' substantiation of criticality safety design solutions for licensing and public relations. The NARCISS and ISKRA critical facilities and unique ORM facility on shielding investigations at the operating OR nuclear research reactor were created in the Kurchatov Institute to solve the mentioned tasks. The range of activities performed at these facilities within the implementation of the previous Russian nuclear power system programs is briefly described in the paper. This experience shall be analyzed in terms of methodological approach to development of future space nuclear systems (this analysis is beyond this paper). Because of the availability of these facilities for experiments, the brief description of their critical assemblies and characteristics is given in this paper.

  15. Update of KSC activities for the space transportation system

    NASA Technical Reports Server (NTRS)

    Gray, R. H.

    1979-01-01

    The paper is a status report on the facilities and planned operations at the Kennedy Space Center (KSC) that will support Space Shuttle launches. The conversion of KSC facilities to support efficient and economical checkout and launch operations in the era of the Space Shuttle is nearing completion. The driving force behind the KSC effort has been the necessity of providing adequate and indispensable facilities and support systems at minimum cost. This required the optimum utilization of existing buildings, equipment and systems, both at KSC and at Air Force property on Cape Canaveral, as well as the construction of two major new facilities and several minor ones. The entirely new structures discussed are the Shuttle Landing Facility and Orbiter Processing Facility. KSC stands ready to provide the rapid reliable economical landing-to-launch processing needed to ensure the success of this new space transportation system.

  16. An Agent-Based Cockpit Task Management System

    NASA Technical Reports Server (NTRS)

    Funk, Ken

    1997-01-01

    An agent-based program to facilitate Cockpit Task Management (CTM) in commercial transport aircraft is developed and evaluated. The agent-based program called the AgendaManager (AMgr) is described and evaluated in a part-task simulator study using airline pilots.

  17. 49 CFR 655.73 - Access to facilities and records.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Access to facilities and records. 655.73 Section... OPERATIONS Administrative Requirements § 655.73 Access to facilities and records. (a) Except as required by... payment for the production of those records. (c) An employer shall permit access to all facilities...

  18. 49 CFR 27.71 - Airport facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 1 2011-10-01 2011-10-01 false Airport facilities. 27.71 Section 27.71... Administration Programs: Airports, Railroads, and Highways § 27.71 Airport facilities. (a) This section applies to all terminal facilities and services owned, leased, or operated on any basis by a recipient of DOT...

  19. 49 CFR 195.436 - Security of facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Security of facilities. 195.436 Section 195.436... PIPELINE Operation and Maintenance § 195.436 Security of facilities. Each operator shall provide protection for each pumping station and breakout tank area and other exposed facility (such as scraper traps...

  20. Vehicle Thermal Management Facilities | Transportation Research | NREL

    Science.gov Websites

    Management Facilities Vehicle Thermal Management Facilities Image of a building with two semi truck evaluation facilities to develop advanced thermal management technologies for vehicles. Vehicle Testing and apparatus. Combined fluid loops bench research apparatus in the Vehicle Thermal Management Laboratory. Photo

  1. 49 CFR 228.101 - Distance requirement; definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... determined in accordance with rules prescribed by the Secretary of Transportation) of any area where railroad... of a new facility; (ii) Expansion of an existing facility; (iii) Placement of a mobile or modular...) Replacement of an existing facility with a new facility on the same site; or (ii) Rehabilitation or...

  2. 9 CFR 3.2 - Indoor housing facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.2 Indoor housing facilities. (a) Heating, cooling, and temperature. Indoor housing facilities for dogs and cats must be sufficiently heated and cooled when necessary to protect the dogs and cats from temperature or humidity extremes and to provide...

  3. 9 CFR 3.5 - Mobile or traveling housing facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.5 Mobile or traveling housing facilities. (a) Heating, cooling, and temperature. Mobile or traveling housing facilities for dogs and cats must be sufficiently heated and cooled when necessary to protect the dogs and cats from temperature or...

  4. 9 CFR 3.4 - Outdoor housing facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.4 Outdoor housing facilities. (a) Restrictions. (1) The following categories of dogs or cats must not be kept in outdoor facilities, unless that practice is specifically approved by the attending veterinarian: (i) Dogs or cats that are not acclimated...

  5. 9 CFR 3.3 - Sheltered housing facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.3 Sheltered housing facilities. (a) Heating, cooling, and temperature. The sheltered part of sheltered housing facilities for dogs and cats must be sufficiently heated and cooled when necessary to protect the dogs and cats from temperature or...

  6. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  7. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  8. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  9. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  10. 49 CFR 37.9 - Standards for accessible transportation facilities.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... construction or alterations of buildings or facilities on which construction has begun, or all approvals for... requirements set forth in Appendices B and D to 36 CFR part 1191, which apply to buildings and facilities... Making Buildings and Facilities Accessible to and Usable by the Physically Handicapped). This paragraph...

  11. 9 CFR 3.5 - Mobile or traveling housing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.5 Mobile or traveling housing facilities. (a) Heating, cooling, and temperature. Mobile or traveling housing facilities for dogs and cats must be sufficiently heated and cooled when necessary to protect the dogs and cats from temperature or...

  12. 9 CFR 3.4 - Outdoor housing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.4 Outdoor housing facilities. (a) Restrictions. (1) The following categories of dogs or cats must not be kept in outdoor facilities, unless that practice is specifically approved by the attending veterinarian: (i) Dogs or cats that are not acclimated...

  13. 9 CFR 3.2 - Indoor housing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.2 Indoor housing facilities. (a) Heating, cooling, and temperature. Indoor housing facilities for dogs and cats must be sufficiently heated and cooled when necessary to protect the dogs and cats from temperature or humidity extremes and to provide...

  14. 9 CFR 3.3 - Sheltered housing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Transportation of Dogs and Cats 1 Facilities and Operating Standards § 3.3 Sheltered housing facilities. (a) Heating, cooling, and temperature. The sheltered part of sheltered housing facilities for dogs and cats must be sufficiently heated and cooled when necessary to protect the dogs and cats from temperature or...

  15. Truck and Transport Mechanic. Occupational Analyses Series.

    ERIC Educational Resources Information Center

    McRory, Aline; Ally, Mohamed

    This analysis covers tasks performed by a truck and transport mechanic, an occupational title some provinces and territories of Canada have also identified as commercial transport vehicle mechanic; transport truck mechanic; truck and coach technician; and truck and transport service technician. A guide to analysis discusses development, structure,…

  16. Control of the polarization of a vacuum-ultraviolet, high-gain, free-electron laser

    DOE PAGES

    Allaria, Enrico; Diviacco, Bruno; Callegari, Carlo; ...

    2014-12-02

    The two single-pass, externally seeded free-electron lasers (FELs) of the FERMI user facility are designed around Apple-II-type undulators that can operate at arbitrary polarization in the vacuum ultraviolet-to-soft x-ray spectral range. Furthermore, within each FEL tuning range, any output wavelength and polarization can be set in less than a minute of routine operations. We report the first demonstration of the full output polarization capabilities of FERMI FEL-1 in a campaign of experiments where the wavelength and nominal polarization are set to a series of representative values, and the polarization of the emitted intense pulses is thoroughly characterized by three independentmore » instruments and methods, expressly developed for the task. The measured radiation polarization is consistently >90% and is not significantly spoiled by the transport optics; differing, relative transport losses for horizontal and vertical polarization become more prominent at longer wavelengths and lead to a non-negligible ellipticity for an originally circularly polarized state. The results from the different polarimeter setups validate each other, allow a cross-calibration of the instruments, and constitute a benchmark for user experiments.« less

  17. Time savings--realized and potential--and fair compensation for community health workers in Kenyan health facilities: a mixed-methods approach.

    PubMed

    Sander, Laura D; Holtzman, David; Pauly, Mark; Cohn, Jennifer

    2015-01-30

    Sub-Saharan Africa faces a severe health worker shortage, which community health workers (CHWs) may fill. This study describes tasks shifted from clinicians to CHWs in Kenya, places monetary valuations on CHWs' efforts, and models effects of further task shifting on time demands of clinicians and CHWs. Mixed methods were used for this study. Interviews were conducted with 28 CHWs and 19 clinicians in 17 health facilities throughout Kenya focusing on task shifting involving CHWs, time savings for clinicians as a result of task shifting, barriers and enabling factors to CHWs' work, and appropriate CHW compensation. Twenty CHWs completed task diaries over a 14-day period to examine current CHW tasks and the amount of time spent performing them. A modeling exercise was conducted examining a current task-shifting example and another scenario in which additional task shifting to CHWs has occurred. CHWs worked an average of 5.3 hours per day and spent 36% of their time performing tasks shifted from clinicians. We estimated a monthly valuation of US$ 117 per CHW. The modeling exercise demonstrated that further task shifting would reduce the number of clinicians needed while maintaining clinic productivity by significantly increasing the number of CHWs. CHWs are an important component of healthcare delivery in Kenya. Our monetary estimates of current CHW contributions provide starting points for further discussion, research and planning regarding CHW compensation and programs. Additional task shifting to CHWs may further offload overworked clinicians while maintaining overall productivity.

  18. 25 CFR 170.808 - Can BIA Road Maintenance Program funds be used to improve IRR transportation facilities?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can BIA Road Maintenance Program funds be used to improve... THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.808 Can BIA Road Maintenance Program funds be used to improve IRR transportation facilities? No. BIA Road...

  19. 49 CFR 614.101 - Cross-reference to management systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... traffic monitoring for highways and public transportation facilities and equipment. ... 49 Transportation 7 2010-10-01 2010-10-01 false Cross-reference to management systems. 614.101 Section 614.101 Transportation Other Regulations Relating to Transportation (Continued) FEDERAL TRANSIT...

  20. 49 CFR 193.2321 - Nondestructive tests.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Nondestructive tests. 193.2321 Section 193.2321 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS...

  1. 49 CFR 193.2321 - Nondestructive tests.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Nondestructive tests. 193.2321 Section 193.2321 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS...

  2. 49 CFR 193.2615 - Isolating and purging.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Isolating and purging. 193.2615 Section 193.2615 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  3. 49 CFR 193.2613 - Auxiliary power sources.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Auxiliary power sources. 193.2613 Section 193.2613 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  4. 49 CFR 193.2621 - Testing transfer hoses.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 3 2010-10-01 2010-10-01 false Testing transfer hoses. 193.2621 Section 193.2621 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES...

  5. GIS and Transportation Planning

    DOT National Transportation Integrated Search

    1998-09-16

    Two main objectives of transportation planning are to simulate the current : traffic volume and to forecast the future traffic volume on a transportation : network. Traffic demand modeling typically consists of the following : tasks (1)defining traff...

  6. Lower cost offshore field development utilizing autonomous vehicles

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Frisbie, F.R.; Vie, K.J.; Welch, D.W.

    1996-12-31

    The offshore oil and gas industry has the requirement to inspect offshore oil and gas pipelines for scour, corrosion and damage as well as inspect and intervene on satellite production facilities. This task is currently performed with Remotely Operated Vehicles (ROV) operated from dynamically positioned (DP) offshore supply or diving support boats. Currently, these tasks are expensive due to the high day rates for DP ships and the slow, umbilical impeded, 1 knot inspection rates of the tethered ROVs, Emerging Autonomous Undersea Vehicle (AUV) technologies offer opportunities to perform these same inspection tasks for 50--75% lower cost, with comparable ormore » improved quality. The new generation LAPV (Linked Autonomous Power Vehicles) will operate from fixed facilities such as TLPs or FPFs and cover an operating field 10 kms in diameter.« less

  7. Definition of ground test for verification of large space structure control

    NASA Technical Reports Server (NTRS)

    Glaese, John R.

    1994-01-01

    Under this contract, the Large Space Structure Ground Test Verification (LSSGTV) Facility at the George C. Marshall Space Flight Center (MSFC) was developed. Planning in coordination with NASA was finalized and implemented. The contract was modified and extended with several increments of funding to procure additional hardware and to continue support for the LSSGTV facility. Additional tasks were defined for the performance of studies in the dynamics, control and simulation of tethered satellites. When the LSSGTV facility development task was completed, support and enhancement activities were funded through a new competitive contract won by LCD. All work related to LSSGTV performed under NAS8-35835 has been completed and documented. No further discussion of these activities will appear in this report. This report summarizes the tether dynamics and control studies performed.

  8. Birth of mice after in vitro fertilization using C57BL/6 sperm transported within epididymides at refrigerated temperatures.

    PubMed

    Mochida, K; Ohkawa, M; Inoue, K; Valdez, D M; Kasai, M; Ogura, A

    2005-07-01

    The transportation of cryopreserved spermatozoa is an economical, efficient, and safe method for the distribution of mouse strains from one facility to another. However, spermatozoa from some strains, including C57BL/6 (B6), are very sensitive to freezing and thawing and frequently fail to fertilize eggs by conventional in vitro fertilization methods at the recipient mouse facility. Since many genetically engineered mice have the B6 genetic background, this sensitivity poses a major obstacle to studies of mouse genetics. We investigated the feasibility of transporting spermatozoa within epididymides under non-freezing conditions. First, we examined the interval that B6 and B6D2F1 (BDF1) spermatozoa retained their ability to fertilize when stored within epididymides at low temperatures (5 degrees C or 7 degrees C). Fertilization rates were >50%, irrespective of the spermatozoa used, when epididymides were stored for 3d at 7 degrees C. B6 spermatozoa, but not BDF1 sperm, had better retention of fertilizing ability at 7 degrees C versus 5 degrees C. We then transported freshly collected B6 and BDF1 epididymides from a sender colony to a recipient colony using a common package delivery service, during which the temperature was maintained at 5 degrees C or 7 degrees C for 2d. Sufficiently high fertilization rates (68.0-77.5%) were obtained for all experimental groups, except for B6 spermatozoa transported at 5 degrees C. These spermatozoa were successfully cryopreserved at the recipient facility and, yielded post-thaw fertilization rates of 27.6-66.4%. When embryos derived from the B6 spermatozoa that were transported at 7 degrees C were transferred into recipient females, 52.7% (38/72) developed to term. In conclusion, transportation of epididymides at refrigerated temperatures is a practical method for the exchange of mouse genetic resources between facilities, especially when these facilities do not specialize in sperm cryopreservation. For the B6 mouse strain, the transportation of epididymides at 7 degrees C rather than 5 degrees C, is recommended.

  9. Peculiarities of organizing the construction of nuclear medicine facilities and the transportation of radionuclide

    NASA Astrophysics Data System (ADS)

    Telichenko, Valeriy; Malykha, Galina; Dorogan, Igor

    2017-10-01

    The article is devoted to the organization of construction of nuclear medicine facilities in Russia. The article describes the main methods of nuclear medical diagnostics, as well as the peculiarities of nuclear medicine facilities that determine the need for application of specific methods for organizing and managing the construction, methods of requirements management in the organization of construction of nuclear medicine facilities. Sustainable development of the transport of radioactive isotopes from the place of production to places of consumption is very important for the safety of the population. The requirements management system is an important and necessary component in organizing the construction of complex facilities, such as nuclear medicine facilities. The author developed and proposed a requirements management system for the design, construction and operation of a nuclear medicine facility, which provides for a cyclic sequence of actions. This system allows reducing the consumption of resources including material and energy during construction and operation of complex objects.

  10. Solar energy and conservation technologies for Caribbean Tourist Facilities (CTF)

    NASA Astrophysics Data System (ADS)

    The primary objectives of the Caribbean Tourist Facilities (CTF) project were to develop and publish materials and conduct workshops on solar energy and conservation technologies that would directly address the needs and interests of tourist facilities in the Caribbean basin. Past contacts with the Caribbean and US tourist industries indicated that decision-makers remained unconvinced that renewable technologies could have a significant impact on development and operation costs or that renewable energy products and services suited their needs. In order to assure that the materials and programs developed were responsive to the Caribbean tourist industry and U.S. conservation and renewable energy industries, marketing research with potential end users and the organizations and associations that serve those users was included as an underlying task in the project. The tasks outlined in the CTF Statement of Work included conference planning, gathering of field data, development of educational materials, and conduct of workshop(s). In addition to providing a chronicle of the fulfillment of those tasks, this final report includes suggestions for distributing the documents developed during the project, venues for future workshops, and other technology transfer and market influence strategies.

  11. 78 FR 78493 - National Rural Transportation Assistance Program: Solicitation for Proposals

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... 5. Task 5: RTAP Rural Resource Center 6. Task 6: Peer-to-Peer Networking 7. Task 7: Research and... for networking with State RTAP managers while establishing communication for information dissemination... Community Edition (DNN) version 05.06.02 (144). 6. Task 6: Peer-to-Peer Networking The recipient will...

  12. 49 CFR 37.51 - Key stations in commuter rail systems.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 1 2010-10-01 2010-10-01 false Key stations in commuter rail systems. 37.51 Section 37.51 Transportation Office of the Secretary of Transportation TRANSPORTATION SERVICES FOR INDIVIDUALS WITH DISABILITIES (ADA) Transportation Facilities § 37.51 Key stations in commuter rail systems...

  13. 47 CFR 69.112 - Direct-trunked transport.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 47 Telecommunication 3 2011-10-01 2011-10-01 false Direct-trunked transport. 69.112 Section 69.112... Computation of Charges § 69.112 Direct-trunked transport. (a) A flat-rated direct-trunked transport charge... other persons that use telephone company direct-trunked transport facilities. (b)(1) For telephone...

  14. 40 CFR 279.43 - Used oil transportation.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 28 2013-07-01 2013-07-01 false Used oil transportation. 279.43... (CONTINUED) STANDARDS FOR THE MANAGEMENT OF USED OIL Standards for Used Oil Transporter and Transfer Facilities § 279.43 Used oil transportation. (a) Deliveries. A used oil transporter must deliver all used oil...

  15. 40 CFR 279.43 - Used oil transportation.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 27 2014-07-01 2014-07-01 false Used oil transportation. 279.43... (CONTINUED) STANDARDS FOR THE MANAGEMENT OF USED OIL Standards for Used Oil Transporter and Transfer Facilities § 279.43 Used oil transportation. (a) Deliveries. A used oil transporter must deliver all used oil...

  16. 40 CFR 279.43 - Used oil transportation.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 28 2012-07-01 2012-07-01 false Used oil transportation. 279.43... (CONTINUED) STANDARDS FOR THE MANAGEMENT OF USED OIL Standards for Used Oil Transporter and Transfer Facilities § 279.43 Used oil transportation. (a) Deliveries. A used oil transporter must deliver all used oil...

  17. 49 CFR 109.9 - Transportation for examination and analysis.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 2 2013-10-01 2013-10-01 false Transportation for examination and analysis. 109.9... ORDERS, AND EMERGENCY RECALLS § 109.9 Transportation for examination and analysis. (a) An agent may direct a package to be transported to a facility for examination and analysis when the agent determines...

  18. 49 CFR 33.20 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... warehousing, ports, services, equipment and facilities, such as transportation carrier shop and repair.... Health resources means drugs, biological products, medical devices, materials, facilities, health...

  19. 49 CFR 33.20 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... warehousing, ports, services, equipment and facilities, such as transportation carrier shop and repair.... Health resources means drugs, biological products, medical devices, materials, facilities, health...

  20. 49 CFR 33.20 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... warehousing, ports, services, equipment and facilities, such as transportation carrier shop and repair.... Health resources means drugs, biological products, medical devices, materials, facilities, health...

  1. Materials Science

    NASA Technical Reports Server (NTRS)

    2003-01-01

    The Materials Science Program is structured so that NASA s headquarters is responsible for the program content and selection, through the Enterprise Scientist, and MSFC provides for implementation of ground and flight programs with a Discipline Scientist and Discipline Manager. The Discipline Working Group of eminent scientists from outside of NASA acts in an advisory capacity and writes the Discipline Document from which the NRA content is derived. The program is reviewed approximately every three years by groups such as the Committee on Microgravity Research, the National Materials Advisory Board, and the OBPR Maximization and Prioritization (ReMaP) Task Force. The flight program has had as many as twenty-six principal investigators (PIs) in flight or flight definition stage, with the numbers of PIs in the future dependent on the results of the ReMaP Task Force and internal reviews. Each project has a NASA-appointed Project Scientist, considered a half-time job, who assists the PI in understanding and preparing for internal reviews such as the Science Concept Review and Requirements Definition Review. The Project Scientist also insures that the PI gets the maximum science support from MSFC, represents the PI to the MSFC community, and collaborates with the Project Manager to insure the project is well-supported and remains vital. Currently available flight equipment includes the Materials Science Research Rack (MSRR-1) and Microgravity Science Glovebox. Ground based projects fall into one or more of several categories. Intellectual Underpinning of Flight Program projects include theoretical studies backed by modeling and computer simulations; bring to maturity new research, often by young researchers, and may include preliminary short duration low gravity experiments in the KC-135 aircraft or drop tube; enable characterization of data sets from previous flights; and provide thermophysical property determinations to aid PIs. Radiation Shielding and preliminary In Situ Resource Utilization (ISRU) studies work towards future long duration missions. Biomaterials support materials issues affecting crew health. Nanostructured Materials are currently considered to be maturing new research, and Advanced Materials for Space Transportation has as yet no PIs. PIs are assigned a NASA Technical Monitor to maintain contact, a position considered to be a 5 percent per PI effort. Currently 33 PIs are supported on the 1996 NRA, which is about to expire, and 59 on the 1998 NRA. Two new NRAs, one for Radiation Shielding and one for Materials Science for Advanced Space Propulsion are due to be announced by the 2003 fiscal year. MSFC has a number of facilities supporting materials science. These include the Microgravity Development Laboratory/SD43; Electrostatic Levitator Facility; SCN Purification Facility; Electron Microscope/Microprobe Facility; Static and Rotating Magnetic Field Facility; X-Ray Diffraction Facility; and the Furnace Development Laboratory.

  2. Orion EM-1 Crew Module Structural Test Article Prepped for Trans

    NASA Image and Video Library

    2017-04-24

    Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, technicians secure the transport container with the Orion Exploration Mission-1 (EM-1) structural test article onto a transport vehicle for the move to the Shuttle Landing Facility. The test article will be loaded in NASA's Super Guppy airplane and transported to Lockheed Martin's Denver facility for testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission.

  3. Orion EM-1 Crew Module Structural Test Article Prepped for Trans

    NASA Image and Video Library

    2017-04-24

    Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the Orion Exploration Mission-1 (EM-1) structural test article inside its transport container, is secured onto a transport vehicle for the move to the Shuttle Landing Facility. The test article will be loaded in NASA's Super Guppy airplane and transported to Lockheed Martin's Denver facility for testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission.

  4. Orion EM-1 Crew Module Structural Test Article Prepped for Trans

    NASA Image and Video Library

    2017-04-24

    Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, technicians secure the Orion Exploration Mission-1 (EM-1) structural test article in its transport container onto a transport vehicle for the move to the Shuttle Landing Facility. The test article will be loaded in NASA's Super Guppy airplane and transported to Lockheed Martin's Denver facility for testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission.

  5. Orion EM-1 Crew Module Structural Test Article Prepped for Trans

    NASA Image and Video Library

    2017-04-24

    Inside the Neil Armstrong Operations and Checkout Building high bay at NASA's Kennedy Space Center in Florida, the Orion Exploration Mission-1 (EM-1) structural test article, secured inside its transport container, is lowered onto a transport vehicle for the move to the Shuttle Landing Facility. The test article will be loaded in NASA's Super Guppy airplane and transported to Lockheed Martin's Denver facility for testing. The Orion spacecraft will launch atop NASA’s Space Launch System rocket on EM-1, its first deep space mission.

  6. Geochemical data package for the Hanford immobilized low-activity tank waste performance assessment (ILAW PA)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DI Kaplan; RJ Serne

    Lockheed Martin Hanford Company (LMHC) is designing and assessing the performance of disposal facilities to receive radioactive wastes that are stored in single- and double-shell tanks at the Hanford Site. The preferred method of disposing of the portion that is classified as low-activity waste is to vitrify the liquid/slurry and place the solid product in near-surface, shallow-land burial facilities. The LMHC project to assess the performance of these disposal facilities is the Hanford Immobilized Low-Activity Tank Waste (ILAW) Performance Assessment (PA) activity. The goal of this project is to provide a reasonable expectation that the disposal of the waste ismore » protective of the general public, groundwater resources, air resources, surface-water resources, and inadvertent intruders. Achieving this goal will require prediction of contaminant migration from the facilities. This migration is expected to occur primarily via the movement of water through the facilities, and the consequent transport of dissolved contaminants in the porewater of the vadose zone. Pacific Northwest National Laboratory assists LMHC in their performance assessment activities. One of the PNNL tasks is to provide estimates of the geochemical properties of the materials comprising the disposal facility, the disturbed region around the facility, and the physically undisturbed sediments below the facility (including the vadose zone sediments and the aquifer sediments in the upper unconfined aquifer). The geochemical properties are expressed as parameters that quantify the adsorption of contaminants and the solubility constraints that might apply for those contaminants that may exceed solubility constraints. The common parameters used to quantify adsorption and solubility are the distribution coefficient (K{sub d}) and the thermodynamic solubility product (K{sub sp}), respectively. In this data package, the authors approximate the solubility of contaminants using a more simplified construct, called the solution concentration limit, a constant value. In future geochemical data packages, they will determine whether a more rigorous measure of solubility is necessary or warranted based on the dose predictions emanating from the ILAW 2001 PA and reviewers' comments. The K{sub d}s and solution concentration limits for each contaminant are direct inputs to subsurface flow and transport codes used to predict the performance of the ILAW system. In addition to the best-estimate K{sub d}s, a reasonable conservative value and a range are provided. They assume that K{sub d} values are log normally distributed over the cited ranges. Currently, they do not give estimates for the range in solubility limits or their uncertainty. However, they supply different values for both the K{sub d}s and solution concentration limits for different spatial zones in the ILAW system and supply time-varying K{sub d}s for the concrete zone, should the final repository design include concrete vaults or cement amendments to buffer the system pH.« less

  7. Factors Associated with the Use of Helicopter Inter-facility Transport of Trauma Patients to Tertiary Trauma Centers within an Organized Rural Trauma System

    PubMed Central

    Stewart, Kenneth; Garwe, Tabitha; Bhandari, Naresh; Danford, Brandon; Albrecht, Roxie

    2016-01-01

    Objective A review of the literature yielded little information regarding factors associated with the decision to use ground (GEMS) or helicopter (HEMS) emergency medical services for trauma patients transferred inter-facility. Furthermore, studies evaluating the impact of inter-facility transport mode on mortality have reported mixed findings. Since HEMS transport is generally reserved for more severely injured patients, this introduces indication bias, which may explain the mixed findings. Our objective was to identify factors at referring non-tertiary trauma centers (NTC) influencing transport mode decision. Methods This was a case-control study of trauma patients transferred from a Level III or IV NTC to a tertiary trauma center (TTC) within 24-hours reported to the Oklahoma State Trauma Registry between 2005 and 2012. Multivariable logistic regression was used to determine clinical and non-clinical factors associated with the decision to use HEMS. Results A total of 7380 patients met the study eligibility. Of these, 2803(38%) were transported inter-facility by HEMS. Penetrating injury, prehospital EMS transport, severe torso injury, hypovolemic shock, and TBI were significant predictors (p<0.05) of HEMS use regardless of distance to a TTC. Association between HEMS use and male gender, Level IV NTC, and local ground EMS resources varied by distance from the TTC. Many HEMS transported patients had minor injuries and normal vital signs. Conclusions Our results suggest that while distance remains the most influential factor associated with HEMS use, significant differences exist in clinical and non-clinical factors between patients transported by HEMS versus GEMS. To ensure comparability of study groups, studies evaluating outcome differences between HEMS and GEMS should take factors determining transport mode into account. The findings will be used to develop propensity scores to balance baseline risk between GEMS and HEMS patients for use in subsequent studies of outcomes. PMID:26986053

  8. Intelligent Transportation System Strategic Plan For Las Vegas Valley

    DOT National Transportation Integrated Search

    1996-11-01

    "INTELLIGENT TRANSPORTATION SYSTEMS" (ITS) IS A COLLECTIVE TERM FOR MEASURES TARGETING THE EFFICIENT OPERATIONS AND MANAGEMENT OF TRANSPORTATION FACILITIES AND SERVICES, USUALLY INVOLVING THE USE OF ELECTRONIC EQUIPMENT FOR COLLECTING,. PROCESSING, R...

  9. 49 CFR 193.2627 - Atmospheric corrosion control.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 193.2627 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2627 Atmospheric corrosion...

  10. 49 CFR 193.2635 - Monitoring corrosion control.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ....2635 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS Maintenance § 193.2635 Monitoring corrosion control...

  11. Factor and Organizational Substitutions to Minimize Costs in the Navy

    DTIC Science & Technology

    2013-12-01

    navigation, propulsion, combat, hotel , communications, in-service support and any system corresponding to further tasks such as transport, hospital...propulsion, combat, hotel , communications, in-service support and any system corresponding to further tasks such as transport, hospital services and command...contract, a cadet may be able to increase her branch choice priority. The Officer Career Satisfaction Program (OCSP) is an incentive program with

  12. Learning to Predict Demand in a Transport-Resource Sharing Task

    DTIC Science & Technology

    2015-09-01

    exhaustive manner. We experimented with the scikit- learn machine- learning library for Python and a range of R packages before settling on R. We...NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA THESIS Approved for public release; distribution is unlimited LEARNING TO...COVERED Master’s thesis 4. TITLE AND SUBTITLE LEARNING TO PREDICT DEMAND IN A TRANSPORT-RESOURCE SHARING TASK 5. FUNDING NUMBERS 6. AUTHOR

  13. Status report on the effects of the 65 mph speed limit on Virginia's rural interstate highway system : submitted to the Secretary of Transportation and Public Safety from the Secretarial Task Force on Interstate Highway Speed limits.

    DOT National Transportation Integrated Search

    1989-01-01

    In 1987, the Secretary of Transportation and Public Safety created a task force to study the potential effects of raising the speed limit on rural interstate highways in Virginia. In its 1988 session, the Virginia General Assembly passed legislation ...

  14. Mobilizable RDF/d-RDF burning program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Niemann, K.; Campbell, J.

    1982-03-01

    The Mobilizable RDF/d-RDF Burning Program was conceived to promote the utilization of refuse-derived fuels (RDF) as a supplement to existing fossil fuel sources in industrial-sized boilers. The program explores the design, development, and eventual construction of densified-RDF (d-RDF) for use in boiler combustion testing as a supplement to stoker coal or wood wastes. The equipment would be mounted on trailers and assembled and operated at preselected sites throughout the country where approximately 750 tons of RDF would be produced and test burned in a local boiler. The equipment, to include a transportable RDF boiler metering and feed system, would thenmore » be moved and operated at two to three test sites annually. The program is intended to encourage the construction of permanent resource recovery facilities by involving local waste handling groups in operating the equipment and producing fuel, and potential local fuel users in testing the fuel in their boilers. The Mobilizable Program was developed from two separate tasks. The first task developed the concept behind the program and defined its operational and organizational structure. The second task, a follow-up to the first, was intended principally to finalize test locations, develop equipment designs and specifications, and formalize a management program. This report summarizes the principal findings of both tasks. It identifies the criteria used to identify test locations, outlines the program's management structure, presents design and performance specifications for both the fuel production equipment and boiler fuel feed systems, and provides a detailed evaluation of the parameters involved in burning RDF in industrial-sized boilers. Final conclusions and recommendations identify problem areas encountered in the program, and discuss possible future directions for such a program.« less

  15. Assateague Island National Seashore alternative transportation systems planning study and business plan for alternative transportation

    DOT National Transportation Integrated Search

    2012-08-31

    The purpose of this study was to (1) study the potential expansion of existing alternative transportation systems (bicycle facilities) and development of new alternative transportation systems in and around the Maryland District of Assateague Island ...

  16. 49 CFR 193.2703 - Design and fabrication.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Design and fabrication. 193.2703 Section 193.2703 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS...

  17. 49 CFR 193.2631 - Internal corrosion control.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 3 2012-10-01 2012-10-01 false Internal corrosion control. 193.2631 Section 193.2631 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS...

  18. 49 CFR 193.2631 - Internal corrosion control.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 3 2013-10-01 2013-10-01 false Internal corrosion control. 193.2631 Section 193.2631 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS...

  19. 49 CFR 193.2631 - Internal corrosion control.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 3 2014-10-01 2014-10-01 false Internal corrosion control. 193.2631 Section 193.2631 Transportation Other Regulations Relating to Transportation (Continued) PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PIPELINE SAFETY LIQUEFIED NATURAL GAS FACILITIES: FEDERAL SAFETY STANDARDS...

  20. LSA Large Area Silicon Sheet Task Continuous Czochralski Process Development

    NASA Technical Reports Server (NTRS)

    Rea, S. N.

    1979-01-01

    A commercial Czochralski crystal growing furnace was converted to a continuous growth facility by installation of a small, in-situ premelter with attendant silicon storage and transport mechanisms. Using a vertical, cylindrical graphite heater containing a small fused quartz test tube linear from which the molten silicon flowed out the bottom, approximately 83 cm of nominal 5 cm diamter crystal was grown with continuous melt addition furnished by the test tube premelter. High perfection crystal was not obtained, however, due primarily to particulate contamination of the melt. A major contributor to the particulate problem was severe silicon oxide buildup on the premelter which would ultimately drop into the primary melt. Elimination of this oxide buildup will require extensive study and experimentation and the ultimate success of continuous Czochralski depends on a successful solution to this problem. Economically, the continuous Czochralski meets near-term cost goals for silicon sheet material.

  1. Initial piloted simulation study of geared flap control for tilt-wing V/STOL aircraft

    NASA Technical Reports Server (NTRS)

    Guerrero, Lourdes M.; Corliss, Lloyd D.

    1991-01-01

    A simulation study of a representative tilt wing transport aircraft was conducted in 1990 on the Ames Vertical Motion Simulator. This simulation is in response to renewed interest in the tilt wing concept for use in future military and civil applications. For past tilt wing concepts, pitch control in hover and low-speed flight has required a tail rotor or reaction jets at the tail. Use of mono cyclic propellers or a geared flap have also been proposed as alternate methods for providing pitch control at low speed. The geared flap is a subject of this current study. This report describes the geared flap concept, the tilt wing aircraft, the simulation model, the simulation facility and experiment setup, the pilots' evaluation tasks and procedures, and the results obtained from the simulation experiment. The pilot evaluations and comments are also documented in the report appendix.

  2. A self-cleaning underwater superoleophobic mesh for oil-water separation.

    PubMed

    Zhang, Lianbin; Zhong, Yujiang; Cha, Dongkyu; Wang, Peng

    2013-01-01

    Oil-water separation has recently become a global challenging task because of the frequent occurrence of oil spill accidents due to the offshore oil production and transportation, and there is an increasing demand for the development of effective and inexpensive approaches for the cleaning-up of the oily pollution in water system. In this study, a self-cleaning underwater superoleophobic mesh that can be used for oil-water separation is prepared by the layer-by-layer (LbL) assembly of sodium silicate and TiO2 nanoparticles on the stainless steel mesh. The integration of the self-cleaning property into the all-inorganic separation mesh by using TiO2 enables the convenient removal of the contaminants by ultraviolet (UV) illumination, and allows for the facile recovery of the separation ability of the contaminated mesh, making it promising for practial oil-water separation applications.

  3. Investigating Uncertainty and Sensitivity in Integrated, Multimedia Environmental Models: Tools for FRAMES-3MRA

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Babendreier, Justin E.; Castleton, Karl J.

    2005-08-01

    Elucidating uncertainty and sensitivity structures in environmental models can be a difficult task, even for low-order, single-medium constructs driven by a unique set of site-specific data. Quantitative assessment of integrated, multimedia models that simulate hundreds of sites, spanning multiple geographical and ecological regions, will ultimately require a comparative approach using several techniques, coupled with sufficient computational power. The Framework for Risk Analysis in Multimedia Environmental Systems - Multimedia, Multipathway, and Multireceptor Risk Assessment (FRAMES-3MRA) is an important software model being developed by the United States Environmental Protection Agency for use in risk assessment of hazardous waste management facilities. The 3MRAmore » modeling system includes a set of 17 science modules that collectively simulate release, fate and transport, exposure, and risk associated with hazardous contaminants disposed of in land-based waste management units (WMU) .« less

  4. A self-cleaning underwater superoleophobic mesh for oil-water separation

    PubMed Central

    Zhang, Lianbin; Zhong, Yujiang; Cha, Dongkyu; Wang, Peng

    2013-01-01

    Oil–water separation has recently become a global challenging task because of the frequent occurrence of oil spill accidents due to the offshore oil production and transportation, and there is an increasing demand for the development of effective and inexpensive approaches for the cleaning-up of the oily pollution in water system. In this study, a self-cleaning underwater superoleophobic mesh that can be used for oil-water separation is prepared by the layer-by-layer (LbL) assembly of sodium silicate and TiO2 nanoparticles on the stainless steel mesh. The integration of the self-cleaning property into the all-inorganic separation mesh by using TiO2 enables the convenient removal of the contaminants by ultraviolet (UV) illumination, and allows for the facile recovery of the separation ability of the contaminated mesh, making it promising for practial oil-water separation applications. PMID:23900109

  5. [Organization and delivery of therapeutic care in modern local wars and armed conflicts].

    PubMed

    Khalimov, Iu Sh; Tkachuk, N A; Zhekalov, A N

    2014-08-01

    The system of providing therapeutic care within a united system of staged treatment of wounded and sick and evacuation was established during the Great Patriotic War of 1941-1945 and helped to return 90,6% of casualties to duty. In terms of local wars and armed conflicts the most important task of military field therapy is to improve the provision of therapeutic support through regional and territorial principles, echeloning of forces and facilities, optimization of allocation of medical institutions in accordance with their capabilities, evacuation routes, etc. The organization of therapeutic assistance should be guided primarily by the size and structure of sanitary losses. In modern local wars cannot exclude the occurrence of massive sanitary losses with limited use of weapons of mass destruction, as a result of failure (with a conventional weapon or as a result of sabotage) of nuclear power plants, chemical plants, and transport containers containing toxic chemicals.

  6. Advanced space transportation system support contract

    NASA Technical Reports Server (NTRS)

    1988-01-01

    The general focus is on a phase 2 lunar base, or a lunar base during the period after the first return of a crew to the Moon, but before permanent occupancy. The software effort produced a series of trajectory programs covering low earth orbit (LEO) to various node locations, the node locations to the lunar surface, and then back to LEO. The surface operations study took a lunar scenario in the civil needs data base (CNDB) and attempted to estimate the amount of space-suit work or extravehicular activity (EVA) required to set up the base. The maintenance and supply options study was a first look at the problems of supplying and maintaining the base. A lunar surface launch and landing facility was conceptually designed. The lunar storm shelter study examined the problems of radiation protection. The lunar surface construction and equipment assembly study defined twenty surface construction and assembly tasks in detail.

  7. EVA Development and Verification Testing at NASA's Neutral Buoyancy Laboratory

    NASA Technical Reports Server (NTRS)

    Jairala, Juniper; Durkin, Robert

    2012-01-01

    As an early step in preparing for future EVAs, astronauts perform neutral buoyancy testing to develop and verify EVA hardware and operations. To date, neutral buoyancy demonstrations at NASA JSC’s Sonny Carter Training Facility have primarily evaluated assembly and maintenance tasks associated with several elements of the ISS. With the retirement of the Space Shuttle, completion of ISS assembly, and introduction of commercial participants for human transportation into space, evaluations at the NBL will take on a new focus. In this session, Juniper Jairala briefly discussed the design of the NBL and, in more detail, described the requirements and process for performing a neutral buoyancy test, including typical hardware and support equipment requirements, personnel and administrative resource requirements, examples of ISS systems and operations that are evaluated, and typical operational objectives that are evaluated. Robert Durkin discussed the new and potential types of uses for the NBL, including those by non-NASA external customers.

  8. EVA Development and Verification Testing at NASA's Neutral Buoyancy Laboratory

    NASA Technical Reports Server (NTRS)

    Jairala, Juniper; Durkin, Robert

    2012-01-01

    As an early step in preparing for future EVAs, astronauts perform neutral buoyancy testing to develop and verify EVA hardware and operations. To date, neutral buoyancy demonstrations at NASA JSC's Sonny Carter Training Facility have primarily evaluated assembly and maintenance tasks associated with several elements of the ISS. With the retirement of the Space Shuttle, completion of ISS assembly, and introduction of commercial participants for human transportation into space, evaluations at the NBL will take on a new focus. In this session, Juniper Jairala briefly discussed the design of the NBL and, in more detail, described the requirements and process for performing a neutral buoyancy test, including typical hardware and support equipment requirements, personnel and administrative resource requirements, examples of ISS systems and operations that are evaluated, and typical operational objectives that are evaluated. Robert Durkin discussed the new and potential types of uses for the NBL, including those by non-NASA external customers.

  9. Residual Barriers for Utilization of Maternal and Child Health Services: Community Perceptions From Rural Pakistan

    PubMed Central

    Memon, Zahid; Zaidi, Shehla; Riaz, Atif

    2016-01-01

    Low utilization of maternal and child care services in rural areas has constrained Pakistan from meeting targets of Millennium Development Goals (MDGs) 4 and 5. This study explores community barriers in accessing Maternal and Child Health (MCH) services in ten remote rural districts of Pakistan. It further presents how the barriers differ across a range of MCH services, and also whether the presence of Community Health Workers (CHWs) reduces client barriers. Qualitative methods were used involving altogether sixty focus group discussions with mothers, their spouses and community health workers. Low awareness, formidable distances, expense, and poorly functional services were the main barriers reported, while cultural and religious restrictions were lesser reported. For preventive services including antenatal care (ANC), facility deliveries, postnatal care (PNC), childhood immunization and family planning, the main barrier was low awareness. Conversely, formidable distances and poorly functional services were the main reported constraints in the event of maternal complications and acute child illnesses. The study also found that clients residing in areas served by CHWs had better awareness only of ANC and family planning, while other MCH services were overlooked by the health worker program. The paper highlights that traditional policy emphasis on health facility infrastructure expansion is not likely to address poor utilization rates in remote rural areas. Preventive MCH services require concerted attention to building community awareness, task shifting from facility to community for services provision, and re-energization of CHW program. For maternal and child emergencies there is strong community demand to utilize health facilities, but this will require catalytic support for transport networks and functional health care centers. PMID:26925902

  10. 49 CFR 191.17 - Transmission systems; gathering systems; and liquefied natural gas facilities: Annual report.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... liquefied natural gas facilities: Annual report. 191.17 Section 191.17 Transportation Other Regulations...; gathering systems; and liquefied natural gas facilities: Annual report. (a) Transmission or Gathering. Each..., 2011. (b) LNG. Each operator of a liquefied natural gas facility must submit an annual report for that...

  11. 49 CFR 191.15 - Transmission systems; gathering systems; and liquefied natural gas facilities: Incident report.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... under § 191.5 of this part. (b) LNG. Each operator of a liquefied natural gas plant or facility must... liquefied natural gas facilities: Incident report. 191.15 Section 191.15 Transportation Other Regulations...; gathering systems; and liquefied natural gas facilities: Incident report. (a) Transmission or Gathering...

  12. 49 CFR 199.231 - Access to facilities and records.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 3 2011-10-01 2011-10-01 false Access to facilities and records. 199.231 Section... TESTING Alcohol Misuse Prevention Program § 199.231 Access to facilities and records. (a) Except as... access to all facilities utilized in complying with the requirements of this subpart to the Secretary of...

  13. 9 CFR 3.79 - Mobile or traveling housing facilities.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... barriers. There must be a barrier between a mobile or traveling housing facility and the public at any time... 9 Animals and Animal Products 1 2012-01-01 2012-01-01 false Mobile or traveling housing facilities... Transportation of Nonhuman Primates 2 Facilities and Operating Standards § 3.79 Mobile or traveling housing...

  14. 9 CFR 3.79 - Mobile or traveling housing facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... barriers. There must be a barrier between a mobile or traveling housing facility and the public at any time... 9 Animals and Animal Products 1 2010-01-01 2010-01-01 false Mobile or traveling housing facilities... Transportation of Nonhuman Primates 2 Facilities and Operating Standards § 3.79 Mobile or traveling housing...

  15. 25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false What facilities are eligible under the BIA Road... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible...

  16. 25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false What facilities are eligible under the BIA Road... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible...

  17. 25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false What facilities are eligible under the BIA Road... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible...

  18. 25 CFR 170.803 - What facilities are eligible under the BIA Road Maintenance Program?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true What facilities are eligible under the BIA Road... AND WATER INDIAN RESERVATION ROADS PROGRAM BIA Road Maintenance § 170.803 What facilities are eligible under the BIA Road Maintenance Program? (a) The following public transportation facilities are eligible...

  19. Recovery. Oxygen Transport Membrane-Based OxyCombustion for CO 2 Capture from Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelly, Sean; Geary, Joan; Chakravrti, Shrikar

    2015-12-22

    This Final report documents and summarizes all of the work performed for the DOE award DE-FC26-07NT43088 during the period from April 2007 - June 2012. This report outlines accomplishments for the following tasks: Task 1 – Process and Systems Engineering, Task 2 – OTM Performance Improvement, Task 3 – OTM Manufacturing Development, Task 4 - Laboratory Scale Testing and Task 5 – Project Management.

  20. Pros and cons of using paid feeding assistants in nursing homes.

    PubMed

    Remsburg, Robin E

    2004-01-01

    Recently the Centers for Medicare and Medicaid Services (CMS), citing increasing resident acuity, staffing shortages, and high turnover rates that make it difficult for nursing homes to provide adequate feeding assistance to residents who need minimal help at mealtimes, began allowing nursing facilities to use single-task workers to provide assistance during mealtimes. This article describes the use of single-task workers to provide feeding assistance to nutritionally at-risk residents during a 6-month clinical study designed to evaluate the effectiveness and feasibility of implementing a buffet-dining program in an academic long-term care facility.

Top