Sample records for typical construction project

  1. Construction Project Performance Improvement through Radio Frequency Identification Technology Application on a Project Supply Chain

    ERIC Educational Resources Information Center

    Wang, Heng

    2017-01-01

    Construction project productivity typically lags other industries and it has been the focus of numerous studies in order to improve the project performance. This research investigated the application of Radio Frequency Identification (RFID) technology on construction projects' supply chain and determined that RFID technology can improve the…

  2. 42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false What is the typical IHS environmental review process for construction projects? 137.294 Section 137.294 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL...

  3. 42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false What is the typical IHS environmental review process for construction projects? 137.294 Section 137.294 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL...

  4. 42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false What is the typical IHS environmental review process for construction projects? 137.294 Section 137.294 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL...

  5. Instantaneous Project Controls: Current Status, State of the Art, Benefits, and Strategies

    ERIC Educational Resources Information Center

    Abbaszadegan, Amin

    2016-01-01

    Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In…

  6. 36. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii. TYPICAL RUBBLE MASONRY HEADWALL AND BOX CULVERT. - Haleakala National Park Roads, Pukalani, Maui County, HI

  7. Quantitative Framework to Evaluate Alternative Dispute Resolution Investments in Architecture Engineering and Construction Projects Using Option and Real Option Theory

    ERIC Educational Resources Information Center

    Menassa, Carol Chukri

    2009-01-01

    A project-specific dispute resolution ladder (DRL) typically consists of multiple alternative dispute resolution (ADR) techniques that are chosen to assist in mitigating the impact of change orders and claims (CCO) occurring during the project construction phase, and avoid their escalation to protracted disputes that adversely affect a…

  8. Energy-Performance-Based Design-Build Process: Strategies for Procuring High-Performance Buildings on Typical Construction Budgets: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scheib, J.; Pless, S.; Torcellini, P.

    NREL experienced a significant increase in employees and facilities on our 327-acre main campus in Golden, Colorado over the past five years. To support this growth, researchers developed and demonstrated a new building acquisition method that successfully integrates energy efficiency requirements into the design-build requests for proposals and contracts. We piloted this energy performance based design-build process with our first new construction project in 2008. We have since replicated and evolved the process for large office buildings, a smart grid research laboratory, a supercomputer, a parking structure, and a cafeteria. Each project incorporated aggressive efficiency strategies using contractual energy usemore » requirements in the design-build contracts, all on typical construction budgets. We have found that when energy efficiency is a core project requirement as defined at the beginning of a project, innovative design-build teams can integrate the most cost effective and high performance efficiency strategies on typical construction budgets. When the design-build contract includes measurable energy requirements and is set up to incentivize design-build teams to focus on achieving high performance in actual operations, owners can now expect their facilities to perform. As NREL completed the new construction in 2013, we have documented our best practices in training materials and a how-to guide so that other owners and owner's representatives can replicate our successes and learn from our experiences in attaining market viable, world-class energy performance in the built environment.« less

  9. Evaluation of salvage and replanted native plants on ADOT projects.

    DOT National Transportation Integrated Search

    2012-06-01

    ADOT has transplanted thousands of saguaros during the construction of roadway projects, and although : the projects are typically tracked for two years, the long-term survivability of saguaros has never been : documented. The purpose of this study i...

  10. 78 FR 61227 - Public Assistance Cost Estimating Format for Large Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-03

    ... itemized breakdown of construction costs for completing the project. For example, a typical project will... percentage factors. For example, if a Part B percentage factor is 2 percent, the estimator adds 2 percent of... specific to the project scope of work. Examples include concrete strength testing, water quality testing...

  11. HEAVY METALS IN RECOVERED FINES FOR CONSTRUCTION AND DEMOLITION DEBRIS RECYCLING FACILITIES IN FLORIDA

    EPA Science Inventory

    A major product recovered from the processing and recycling of construction and demolition (C&D) debris is screened soil, also referred to as fines. A proposed reuse option for C&D debris fines is fill material, typically in construction projects as a substitute for natural soil....

  12. Comparison of Navy and Private-Sector Construction Costs

    DTIC Science & Technology

    1997-09-01

    contracts are comparable to private - sector construction costs. This report compares those costs. The report includes a description of the methodology...costs of complying with federal contracting requirements as compared with the costs of similar projects completed under typical private - sector contracts...The study found that the costs of facilities constructed under Navy contracts compare favorably to private - sector construction costs for similar

  13. Multimode resource-constrained multiple project scheduling problem under fuzzy random environment and its application to a large scale hydropower construction project.

    PubMed

    Xu, Jiuping; Feng, Cuiying

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method.

  14. Multimode Resource-Constrained Multiple Project Scheduling Problem under Fuzzy Random Environment and Its Application to a Large Scale Hydropower Construction Project

    PubMed Central

    Xu, Jiuping

    2014-01-01

    This paper presents an extension of the multimode resource-constrained project scheduling problem for a large scale construction project where multiple parallel projects and a fuzzy random environment are considered. By taking into account the most typical goals in project management, a cost/weighted makespan/quality trade-off optimization model is constructed. To deal with the uncertainties, a hybrid crisp approach is used to transform the fuzzy random parameters into fuzzy variables that are subsequently defuzzified using an expected value operator with an optimistic-pessimistic index. Then a combinatorial-priority-based hybrid particle swarm optimization algorithm is developed to solve the proposed model, where the combinatorial particle swarm optimization and priority-based particle swarm optimization are designed to assign modes to activities and to schedule activities, respectively. Finally, the results and analysis of a practical example at a large scale hydropower construction project are presented to demonstrate the practicality and efficiency of the proposed model and optimization method. PMID:24550708

  15. Comparison of conventional and self-consolidating concrete for drilled shaft construction : [tech summary].

    DOT National Transportation Integrated Search

    2015-04-01

    Significant anomalies have been observed in many of the recent drilled shaft construction projects throughout Louisiana. : The anomalies typically occur in the form of honeycombing within the zones of heavy reinforcement or sometimes at the : shaft b...

  16. Untapped Resources, Untapped Labor Pool: Using Federal Highway Funds to Prepare Women for Careers in Construction

    ERIC Educational Resources Information Center

    Hegewisch, Ariane; Henrici, Jane; Shaw, Elyse; Hooper, Thomas

    2014-01-01

    Women are underrepresented in highway, street, and bridge construction where employment is projected to grow by more than 20 percent until 2022. Creating sustainable pathways into construction careers fills critical hiring needs for industry while improving economic security for women, as these jobs typically provide family-supporting wages with…

  17. Introduction to Cost Control Strategies for Zero Energy Buildings: High-Performance Design and Construction on a Budget (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2014-09-01

    Momentum behind zero energy building design and construction is increasing, presenting a tremendous opportunity for advancing energy performance in the commercial building industry. At the same time, there is a lingering perception that zero energy buildings must be cost prohibitive or limited to showcase projects. Fortunately, an increasing number of projects are demonstrating that high performance can be achieved within typical budgets. This factsheet highlights replicable, recommended strategies for achieving high performance on a budget, based on experiences from past projects.

  18. 133. Photocopy of original construction drawing, dated 21 March 1940 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    133. Photocopy of original construction drawing, dated 21 March 1940 (Original print in the possession of U.S. Army Corps of Engineers, Portland District, Portland, OR.) (P-40-8) TYPICAL PIER ELEVATION. - Bonneville Project, Powerhouse No.1, Spanning Bradford Slough, from Bradford Island, Bonneville, Multnomah County, OR

  19. Chapter 15: Commercial New Construction Evaluation Protocol. The Uniform Methods Project: Methods for Determining Energy Efficiency Savings for Specific Measures

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kurnik, Charles W.; Keates, Steven

    This protocol is intended to describe the recommended method when evaluating the whole-building performance of new construction projects in the commercial sector. The protocol focuses on energy conservation measures (ECMs) or packages of measures where evaluators can analyze impacts using building simulation. These ECMs typically require the use of calibrated building simulations under Option D of the International Performance Measurement and Verification Protocol (IPMVP).

  20. Department of the Air Force. FY 1995 Budget Estimates. Military Construction and Family Housing

    DTIC Science & Technology

    1994-02-01

    monorail lift systems and provide AFFF fire protection system, and elevators. Renovate engineering and work areas; provide new air make-up unit and...135,0U0 SY 1,200 880-212 AFFF FIRE SUPPRESSION SYSTEM LS 800 FOR FUEL CELL TOTAL: 10,450 9b. Future Projects: Typical Planned Next Three Years: 111...PROTECT 2 EA 3,600 PH II & AFFF PUMPS/RESERVOIR TOTAL: 27,900 9b. Future Projects: Typical Planned Next Three Years: 442-758 WAREHOUSE 107,000 SF

  1. Avoiding Preconceptions in School Construction

    ERIC Educational Resources Information Center

    Maletz, Andrew

    2012-01-01

    An existing facility that is being upgraded or retrofitted today typically is 30 to 45 years old, often with limited natural light, antiquated mechanical systems and retrofitted technology. All too often at the outset of a project, the broader project goals--and even those narrower in scope--seem daunting or altogether impossible when staring at a…

  2. 42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... impact on the environment, and therefore do not require environmental impact statements (EIS). Under..., state, and local officials and interested parties on potential environmental effects; (2) Document...

  3. 42 CFR 137.294 - What is the typical IHS environmental review process for construction projects?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... impact on the environment, and therefore do not require environmental impact statements (EIS). Under..., state, and local officials and interested parties on potential environmental effects; (2) Document...

  4. Alternatives to Full-Depth Patching on Resurfacing Projects

    DOT National Transportation Integrated Search

    1993-09-01

    The vast majority of Illinois' non-interstate network is constructed of jointed Portland cement concrete (PCC). Typically, Illinois' first significant rehabilitation efforts for jointed PCC pavements are in the form of full-depth bituminous concrete ...

  5. Developing a mixture design specification for flexible base construction.

    DOT National Transportation Integrated Search

    2012-06-01

    In the Texas Department of Transportation (TxDOT), flexible base producers typically generate large stockpiles of material exclusively for TxDOT projects. This large state-only inventory often maintained by producers, along with time requiremen...

  6. Evaluation of aggregate sections at Mn/ROAD

    DOT National Transportation Integrated Search

    2000-06-01

    This project focuses on the second construction phase of the Minnesota Road Research facility (Mn/ROAD) and evaluates three typical, locally available, surfacing aggregates along with a rollover section from the initial phase for performance. The pro...

  7. Carbon footprint for HMA and PCC pavements.

    DOT National Transportation Integrated Search

    2011-07-25

    Motivated by the need to address challenges of global climate change, this study develops and implements a project : based life cycle framework that can be used to estimate the carbon footprint for typical construction work-items : found in reconstru...

  8. Use of typical moisture : density curves.

    DOT National Transportation Integrated Search

    1965-05-01

    One of the many problems associated with compaction control on any construction project is the time consuming task of obtaining maximum density and optimum moisture content of soils both in the laboratory and in the field. In addition to the time ele...

  9. DEVELOPING A THEORY OF EDUCATIONAL PRACTICE FOR THE ELEMENTARY SCHOOL. PROJECT REPORT TO THE FORD FOUNDATION FUND FOR THE ADVANCEMENT OF EDUCATION.

    ERIC Educational Resources Information Center

    KAYA, ESIN; AND OTHERS

    A TWO-YEAR COOPERATIVE RESEARCH PROJECT (1965-1967) WAS CONDUCTED TO SYNTHESIZE THE BODY OF AVAILABLE EMPIRICAL KNOWLEDGE RELATED TO EDUCATIONAL PRACTICE IN A MANNER TYPICAL OF SCIENTIFIC THEORY CONSTRUCTION AND TO DEVELOP A DICTIONARY OF OVER 600 COMMON EDUCATIONAL TERMS OPERATIONALLY DEFINED IN AN APPENDED GLOSSARY. THE THREE MAIN PHASES OF THE…

  10. Laboratory investigation of grouted coupler connection details for ABC bridge projects.

    DOT National Transportation Integrated Search

    2015-08-01

    With an ever increasing desire to utilize accelerated bridge construction (ABC) techniques, it is becoming critical that bridge : designers and contractors have confidence in typical details. The Keg Creek Bridge on US 6 in Iowa was a recent ABC exam...

  11. Safe and effective speed reductions for freeway work zones phase 2.

    DOT National Transportation Integrated Search

    2014-09-01

    Freeway preservation projects typically require construction workers to conduct their : work in close proximity to ongoing traffic and often reduce traffic flow to a single lane while work is : undertaken in an adjacent lane. Due to the short-term na...

  12. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESKO KF; BERRIOCHOA MV

    2010-02-26

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business constructioin subcontractors while performing high hazard work in a safe and productive manner. Previous to the WRPS contract, construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipment and structures and installationmore » of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper descirbes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method (John E Schaufelberger, Len Holm, "Management of Construction Projects, A Constructor's Perspective", University of Washington, Prentice Hall 2002). This method was implemented in the first quarter of Fiscal Year 2009 (FY2009), where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by URS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  13. Degrees of connectivity: Systems model for upstream risk assessment and mitigation.

    PubMed

    Gambatese, John; AlOmari, Kasim

    2016-08-01

    There is growing recognition that in order to further improve safety performance, attention needs to be given beyond the immediate working conditions and worker actions. A systems approach to construction safety enables considering: multiple project elements simultaneously; connections between different elements; and all system elements affected by safety risk. This paper describes recent and current research to conceptualize a typical building project in terms of connections between workers, activities, and design elements, and to verify and analyze impacts of the design and worker interactions on worker safety. Prior research provides the basis for a network tying the design elements, construction activities, and work crews on a typical building project together along with the extent of interaction between each of the system elements in terms of safety. In conjunction with this systems approach, the researchers propose a concept for viewing and managing construction safety through four different types of connections, or "degrees of connectivity," between the different workers, activities, and design elements in the system. The degrees of connectivity are defined as: interacting with the design element during its construction (DoC #1); interacting with the design element in its final form to attach another component to it (DoC #2) or by working in the vicinity of it (DoC #3); and indirectly interacting with the design element through another worker (DoC #4). To support and verify the presence of the concept in practice, the researchers conducted a survey of construction personnel. The survey results confirm that the four different degrees of connectivity are present and felt during construction operations, and indicate that attention should be given to all design elements, activities, and workers to which a worker is "connected". According to the survey respondents, DoC's #1 and #2 are recognized as the most widely present on construction sites. Eighty percent of the respondents believe that the design element has a moderate or greater impact on worker safety while it is being constructed. These initial research steps provide the starting point for continuing study that aims to develop and demonstrate the degrees of connectivity concept linking workers and design elements, with the goal of understanding how to design a project and work operations in order to improve safety during construction. Copyright © 2015 Elsevier Ltd. All rights reserved.

  14. The impact of a new bypass route on the local economy and quality of life

    DOT National Transportation Integrated Search

    2001-06-01

    Highway improvements such as bypass construction typically are motivated by a desire to improve the flow and safety of travel. But, given the importance of travel, transportation improvement projects often can affect the local economy and quality of ...

  15. Cost Analysis of Renewable Energy-Based Microgrids

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Giraldez Miner, Julieta I; Singh, Shruti; Gao, David Wenzhong

    This paper analyzes the cost composition of microgrid construction as well as the influencing key factors. The Microgrid Cost Study aims at identifying the average cost of a typical microgrid project. The project is limited to the vicinity of U.S. and hence takes into account of only existing microgrid projects in U.S. The project's objective is to find cost of microgrid and its individual components for next 5 years. This will help in R&D for future microgrid projects as well as help investors/developers/researchers get an idea about the cost of their projects that they might want to start in nearmore » future.« less

  16. TANK OPERATIONS CONTRACT CONSTRUCTION MANAGEMENT METHODOLOGY UTILIZING THE AGENCY METHOD OF CONSTRUCTION MANAGEMENT TO SAFELY AND EFFECTIVELY COMPLETE NUCLEAR CONSTRUCTION WORK

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LESO KF; HAMILTON HM; FARNER M

    Washington River Protection Solutions, LLC (WRPS) has faced significant project management challenges in managing Davis-Bacon construction work that meets contractually required small business goals. The unique challenge is to provide contracting opportunities to multiple small business construction subcontractors while performing high hazard work in a safe and productive manner. Previous to the Washington River Protection Solutions, LLC contract, Construction work at the Hanford Tank Farms was contracted to large companies, while current Department of Energy (DOE) Contracts typically emphasize small business awards. As an integral part of Nuclear Project Management at Hanford Tank Farms, construction involves removal of old equipmentmore » and structures and installation of new infrastructure to support waste retrieval and waste feed delivery to the Waste Treatment Plant. Utilizing the optimum construction approach ensures that the contractors responsible for this work are successful in meeting safety, quality, cost and schedule objectives while working in a very hazardous environment. This paper describes the successful transition from a traditional project delivery method that utilized a large business general contractor and subcontractors to a new project construction management model that is more oriented to small businesses. Construction has selected the Agency Construction Management Method. This method was implemented in the first quarter of Fiscal Year (FY) 2009, where Construction Management is performed by substantially home office resources from the URS Northwest Office in Richland, Washington. The Agency Method has allowed WRPS to provide proven Construction Managers and Field Leads to mentor and direct small business contractors, thus providing expertise and assurance of a successful project. Construction execution contracts are subcontracted directly by WRPS to small or disadvantaged contractors that are mentored and supported by DRS personnel. Each small contractor is mentored and supported utilizing the principles of the Construction Industry Institute (CII) Partnering process. Some of the key mentoring and partnering areas that are explored in this paper are, internal and external safety professional support, subcontractor safety teams and the interface with project and site safety teams, quality assurance program support to facilitate compliance with NQA-1, construction, team roles and responsibilities, work definition for successful fixed price contracts, scheduling and interface with project schedules and cost projection/accruals. The practical application of the CII Partnering principles, with the Construction Management expertise of URS, has led to a highly successful construction model that also meets small business contracting goals.« less

  17. A preliminary analysis of recent HVAC energy projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gaddy, P.J.; Haake, C.F.

    A typical Government HVAC design over the last 30 years consisted of two oversized (equal tonnage) electric chillers, two oversized (equal NBTU ratings) boilers, an air economizer cycle, a constant air volume system and a central station pneumatic control system. This typical basic layout for plant design has certain advantages such as simplicity and ease to construct throughout the country. The cookie cutter design/build approach suited federal facilities, when utility costs were not a major consideration, in-house maintenance and operations personnel were plentiful and energy conservation was a moral priority and not an economic concern. Those days are history asmore » energy costs have escalated and operating budgets continue to shrink leaving fewer personnel to maintain the same buildings. Advances in HVAC technology and the reduction in costs for energy efficient systems have finally started affecting the Federal Government`s HVAC replacement and new construction designs. This paper is a brief description of three HVAC projects that go outside the traditional government HVAC design parameters. GSA`s Pacific Rim Region, covering the states of Hawaii, California, Nevada, and Arizona, has implemented three HVAC projects utilizing different technologies not normally found in GSA Federal facilities.« less

  18. 14 CFR 151.89 - Roads.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Appendix G sets forth typical eligible and ineligible items of road construction covered by this section. ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Roads. 151.89 Section 151.89 Aeronautics... AID TO AIRPORTS Project Programming Standards § 151.89 Roads. (a) Federal-aid Airport Program funds...

  19. Using Indigenous Materials for Construction

    DTIC Science & Technology

    2015-07-01

    Theoretical models were devised for prediction of the structural attributes of indigenous ferrocement sheets and sandwich composite panels comprising the...indigenous ferrocement skins and aerated concrete core. Structural designs were developed for these indigenous sandwich composite panels in typical...indigenous materials and building systems developed in the project were evaluated. Numerical modeling capabilities were developed for structural

  20. Laboratory and field testing of an accelerated bridge construction demonstration bridge : US Highway 6 bridge over Keg Creek : tech transfer summary.

    DOT National Transportation Integrated Search

    2013-04-01

    To address the need for the development of a fast, repeatable, and dependable way to replace typical bridges across the country, the Transportation Research Board (TRB) developed project R04, Innovative Designs for Rapid Renewal, as part of the...

  1. Building information models for astronomy projects

    NASA Astrophysics Data System (ADS)

    Ariño, Javier; Murga, Gaizka; Campo, Ramón; Eletxigerra, Iñigo; Ampuero, Pedro

    2012-09-01

    A Building Information Model is a digital representation of physical and functional characteristics of a building. BIMs represent the geometrical characteristics of the Building, but also properties like bills of quantities, definition of COTS components, status of material in the different stages of the project, project economic data, etc. The BIM methodology, which is well established in the Architecture Engineering and Construction (AEC) domain for conventional buildings, has been brought one step forward in its application for Astronomical/Scientific facilities. In these facilities steel/concrete structures have high dynamic and seismic requirements, M&E installations are complex and there is a large amount of special equipment and mechanisms involved as a fundamental part of the facility. The detail design definition is typically implemented by different design teams in specialized design software packages. In order to allow the coordinated work of different engineering teams, the overall model, and its associated engineering database, is progressively integrated using a coordination and roaming software which can be used before starting construction phase for checking interferences, planning the construction sequence, studying maintenance operation, reporting to the project office, etc. This integrated design & construction approach will allow to efficiently plan construction sequence (4D). This is a powerful tool to study and analyze in detail alternative construction sequences and ideally coordinate the work of different construction teams. In addition engineering, construction and operational database can be linked to the virtual model (6D), what gives to the end users a invaluable tool for the lifecycle management, as all the facility information can be easily accessed, added or replaced. This paper presents the BIM methodology as implemented by IDOM with the E-ELT and ATST Enclosures as application examples.

  2. Application of Computer Technologies in Building Design by Example of Original Objects of Increased Complexity

    NASA Astrophysics Data System (ADS)

    Vasilieva, V. N.

    2017-11-01

    The article deals with the solution of problems in AutoCAD offered at the All-Russian student Olympiads at the section of “Computer graphics” that are not typical for the students of construction specialties. The students are provided with the opportunity to study the algorithm for solving original tasks of high complexity. The article shows how the unknown parameter underlying the construction can be determined using a parametric drawing with geometric constraints and dimensional dependencies. To optimize the mark-up operation, the use of the command for projecting the points and lines of different types onto bodies and surfaces in different directions is shown. For the construction of a spring with a different pitch of turns, the paper describes the creation of a block from a part of the helix and its scaling when inserted into a model with unequal coefficients along the axes. The advantage of the NURBS surface and the application of the “body-surface-surface-NURBS-body” conversion are reflected to enhance the capabilities of both solid and surface modeling. The article’s material introduces construction students into the method of constructing complex models in AutoCAD that are not similar to typical training assignments.

  3. Experimental use of Line-X coated steel pipe piles, Clay Hill Bridge (#2157) replacement project over the Mousam River, Route 9/Western Avenue, Kennebunk, Maine.

    DOT National Transportation Integrated Search

    2013-02-01

    Steel pipe piles used by MaineDOT for bridge construction are typically coated with a fusion-bonded epoxy (FBE). FBE is a powder-based coating with properties similar to traditional : epoxies. Its name is derived from the process by which it adheres ...

  4. Summer temperatures of roof assemblies using western redcedar, wood-thermoplastic composite, or fiberglass shingles

    Treesearch

    Jerrold E. Winandy; H. Michael Barnes; Robert H. Falk

    2004-01-01

    For over 10 years, the Forest Products Laboratory has been monitoring the temperature histories of roof sheathing, roof rafters, and unventilated attics in outdoor attic structures that simulate typical light-framed construction. This report briefly summarizes findings from the roof temperature assessment project on black and white fiberglass shingles conducted from...

  5. Building Information Modelling (BIM) and Unmanned Aerial Vehicle (UAV) technologies in infrastructure construction project management and delay and disruption analysis

    NASA Astrophysics Data System (ADS)

    Vacanas, Yiannis; Themistocleous, Kyriacos; Agapiou, Athos; Hadjimitsis, Diofantos

    2015-06-01

    Time in infrastructure construction projects has always been a fundamental issue as early as from the inception of a project, during the construction process and often after the completion and delivery. In a typical construction contract time related matters such as the completion date and possible delays are among the most important issues that are dealt with by the contract provisions. In the event of delay there are usually provisions for extension of time award to the contractor with possible reimbursement for the extra cost and expenses caused by this extension of time to the contract duration. In the case the contractor is not entitled to extension of time, the owner will be possibly entitled to amounts as compensation for the time prohibited from using his development. Even in the event of completion within the time agreed, under certain circumstances a contractor may have claims for reimbursement for extra costs incurred due to induced acceleration measures he had to take in order to mitigate disruption effects caused to the progress of the works by the owner or his representatives. Depending on the size of the project and the agreement amount, these reimbursement sums may be extremely high. Therefore innovative methods with the exploitation of new technologies for effective project management for the avoidance of delays, delay analysis and mitigation measures are essential; moreover, methods for collecting efficiently information during the construction process so that disputes regarding time are avoided or resolved in a quick and fair manner are required. This paper explores the state of art for existing use of Building Information Modelling (BIM) and Unmanned Aerial Vehicles (UAV) technologies in the construction industry in general. Moreover the paper considers the prospect of using BIM technology in conjunction with the use of UAV technology for efficient and accurate as-built data collection and illustration of the works progress during an infrastructure construction project in order to achieve more effective project management, record keeping and delay analysis.

  6. Definition of large components assembled on-orbit and robot compatible mechanical joints

    NASA Technical Reports Server (NTRS)

    Williamsen, J.; Thomas, F.; Finckenor, J.; Spiegel, B.

    1990-01-01

    One of four major areas of project Pathfinder is in-space assembly and construction. The task of in-space assembly and construction is to develop the requirements and the technology needed to build elements in space. A 120-ft diameter tetrahedral aerobrake truss is identified as the focus element. A heavily loaded mechanical joint is designed to robotically assemble the defined aerobrake element. Also, typical large components such as habitation modules, storage tanks, etc., are defined, and attachment concepts of these components to the tetrahedral truss are developed.

  7. Measuring Carbon Footprint of Flexible Pavement Construction Project in Indonesia

    NASA Astrophysics Data System (ADS)

    Hatmoko, Jati Utomo Dwi; Hidayat, Arif; Setiawati, Apsari; Prasetyo, Stefanus Catur Adi

    2018-02-01

    Road infrastructure in Indonesia is mainly dominated by flexible pavement type. Its construction process, however, has raised concerns in terms of its environment impacts. This study aims to track and measure the carbon footprint of flexible pavement. The objectives are to map the construction process in relation to greenhouse gas (GHG) emissions, to quantify them in terms of carbon dioxide equivalents (CO2e) as generated by the process of production and transportation of raw materials, and the operation of plant off-site and on-site project. Data collection was done by having site observations and interviews with project stakeholders. The results show a total emissions of 70.888 tonnes CO2e, consisting of 34.248 tonnes CO2e (48.31%) off-site activities and 36.640 tonnes CO2e (51.687%) on-site activities. The two highest CO2e emissions were generated by the use of plant for asphalt concrete laying activities accounted 34.827 tonnes CO2e (49.130%), and material transportation accounted 24.921 (35.155%). These findings provide a new perspective of the carbon footprint in flexible pavement and suggest the urgent need for the use of more efficient and environmentally friendly plant in construction process as it shows the most significant contribution on the CO2e. This study provides valuable understanding on the environmental impact of typical flexible pavement projects in Indonesia, and further can be used for developing green road framework.

  8. Students' construction of a simple steam distillation apparatus and development of creative thinking skills: A project-based learning

    NASA Astrophysics Data System (ADS)

    Diawati, Chansyanah; Liliasari, Setiabudi, Agus; Buchari

    2017-05-01

    This project-based learning combined the chemistry of separation process using steam distillation with engineering design process in an undergraduate chemistry course. Students built upon their knowledge of phase changes, immiscible mixture, and the relationship between vapor pressure and boiling point to complete a project of modifications steam distillation apparatus. The research method is a qualitative case study, which aims to describe how (1) the creative thinking skills of students emerged during six weeks of theproject, (2) students built steam distillation apparatus characteristics as the project product and (3) students response to the project-based learning model. The results showed that the students had successfully constructed a steam distillation apparatus using plastic kettle as steam generator and distillation flask. A Plastic tubewas used to drain water vapor from steam generator to distillation flask and to drain steam containing essential oil to the condenser. A biscuit tin filled with ice was used as a condenser. The time required until resulting distillate was fifteen minutes. The production of essential was conductive qualitatively by a very strong smell typical of essential oil and two phases of distillate. Throughout the project, students formulated the relevant and varied problem, formulated the goals, proposed the ideas of the apparatus and materials, draw apparatus design, constructed apparatus, tested apparatus, evaluated, and reported the project. Student response was generally positive. They were pleased, interested, more understanding the concepts and work apparatus principles, also implemented new ideas. These results indicate that project-based learning can develop students' creative thinking skills. Based on these results, it is necessary to conduct research and implemented project-based learning to other concepts.

  9. SOLCOST. Solar Hot Water Handbook. A Simplified Design Method for Sizing and Costing Residential and Commercial Solar Service Hot Water Systems. Second Edition.

    ERIC Educational Resources Information Center

    Energy Research and Development Administration, Washington, DC. Div. of Solar Energy.

    This pamphlet offers a preview of information services available from Solcost, a research and development project. The first section explains that Solcost calculates system and costs performance for solar heated and cooled new and retrofit constructions, such as residential buildings and single zone commercial buildings. For a typical analysis,…

  10. Review of NASA's Hypersonic Research Engine Project

    NASA Technical Reports Server (NTRS)

    Andrews, Earl H.; Mackley, Ernest A.

    1993-01-01

    The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a hypersonic research ramjet/scramjet engine for high performance and to flight-test the developed concept over the speed range from Mach 3 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research aircraft, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of engine models then became the focus of the project. Two axisymmetric full-scale engine models having 18-inch-diameter cowls were fabricated and tested: a structural model and a combustion/propulsion model. A brief historical review of the project with salient features, typical data results, and lessons learned is presented.

  11. Systems Engineering and Reusable Avionics

    NASA Technical Reports Server (NTRS)

    Conrad, James M.; Murphy, Gloria

    2010-01-01

    One concept for future space flights is to construct building blocks for a wide variety of avionics systems. Once a unit has served its original purpose, it can be removed from the original vehicle and reused in a similar or dissimilar function, depending on the function blocks the unit contains. For example: Once a lunar lander has reached the moon's surface, an engine controller for the Lunar Decent Module would be removed and used for a lunar rover motor control unit or for a Environmental Control Unit for a Lunar Habitat. This senior design project included the investigation of a wide range of functions of space vehicles and possible uses. Specifically, this includes: (1) Determining and specifying the basic functioning blocks of space vehicles. (2) Building and demonstrating a concept model. (3) Showing high reliability is maintained. The specific implementation of this senior design project included a large project team made up of Systems, Electrical, Computer, and Mechanical Engineers/Technologists. The efforts were made up of several sub-groups that each worked on a part of the entire project. The large size and complexity made this project one of the more difficult to manage and advise. Typical projects only have 3-4 students, but this project had 10 students from five different disciplines. This paper describes the difference of this large project compared to typical projects, and the challenges encountered. It also describes how the systems engineering approach was successfully implemented so that the students were able to meet nearly all of the project requirements.

  12. LSST summit facility construction progress report: reacting to design refinements and field conditions

    NASA Astrophysics Data System (ADS)

    Barr, Jeffrey D.; Gressler, William; Sebag, Jacques; Seriche, Jaime; Serrano, Eduardo

    2016-07-01

    The civil work, site infrastructure and buildings for the summit facility of the Large Synoptic Survey Telescope (LSST) are among the first major elements that need to be designed, bid and constructed to support the subsequent integration of the dome, telescope, optics, camera and supporting systems. As the contracts for those other major subsystems now move forward under the management of the LSST Telescope and Site (T and S) team, there has been inevitable and beneficial evolution in their designs, which has resulted in significant modifications to the facility and infrastructure. The earliest design requirements for the LSST summit facility were first documented in 2005, its contracted full design was initiated in 2010, and construction began in January, 2015. During that entire development period, and extending now roughly halfway through construction, there continue to be necessary modifications to the facility design resulting from the refinement of interfaces to other major elements of the LSST project and now, during construction, due to unanticipated field conditions. Changes from evolving interfaces have principally involved the telescope mount, the dome and mirror handling/coating facilities which have included significant variations in mass, dimensions, heat loads and anchorage conditions. Modifications related to field conditions have included specifying and testing alternative methods of excavation and contending with the lack of competent rock substrate where it was predicted to be. While these and other necessary changes are somewhat specific to the LSST project and site, they also exemplify inherent challenges related to the typical timeline for the design and construction of astronomical observatory support facilities relative to the overall development of the project.

  13. Parametric Modelling (bim) for the Documentation of Vernacular Construction Methods: a Bim Model for the Commissariat Building, Ottawa, Canada

    NASA Astrophysics Data System (ADS)

    Fai, S.; Filippi, M.; Paliaga, S.

    2013-07-01

    Whether a house of worship or a simple farmhouse, the fabrication of a building reveals both the unspoken cultural aspirations of the builder and the inevitable exigencies of the construction process. In other-words, why buildings are made is intimately and inevitably associated with how buildings are made. Nowhere is this more evident than in vernacular architecture. At the Carleton Immersive Media Studio (CIMS) we are concerned that the de-population of Canada's rural areas, paucity of specialized tradespersons, and increasing complexity of building codes threaten the sustainability of this invaluable cultural resource. For current and future generations, the quantitative and qualitative values of traditional methods of construction are essential for an inclusive cultural memory. More practically, and equally pressing, an operational knowledge of these technologies is essential for the conservation of our built heritage. To address these concerns, CIMS has launched a number of research initiatives over the past five years that explore novel protocols for the documentation and dissemination of knowledge related to traditional methods of construction. Our current project, Cultural Diversity and Material Imagination in Canadian Architecture (CDMICA), made possible through funding from Canada's Social Sciences and Humanities Research Council (SSHRC), explores the potential of building information modelling (BIM) within the context of a web-based environment. In this paper, we discuss our work-to-date on the development of a web-based library of BIM details that is referenced to ''typical'' assemblies culled from 19C and early 20C construction manuals. The parametric potential of these ''typical'' details is further refined by evidence from the documentation of ''specific'' details studied during comprehensive surveys of extant heritage buildings. Here, we consider a BIM of the roof truss assembly of one of the oldest buildings in Canada's national capital - the Commissariat Building and current home to the Bytown Museum - as a case study within the CDMICA project.

  14. NASA's Hypersonic Research Engine Project: A review

    NASA Technical Reports Server (NTRS)

    Andrews, Earl H.; Mackley, Ernest A.

    1994-01-01

    The goals of the NASA Hypersonic Research Engine (HRE) Project, which began in 1964, were to design, develop, and construct a high-performance hypersonic research ramjet/scramjet engine for flight tests of the developed concept over the speed range of Mach 4 to 8. The project was planned to be accomplished in three phases: project definition, research engine development, and flight test using the X-15A-2 research airplane, which was modified to carry hydrogen fuel for the research engine. The project goal of an engine flight test was eliminated when the X-15 program was canceled in 1968. Ground tests of full-scale engine models then became the focus of the project. Two axisymmetric full-scale engine models, having 18-inch-diameter cowls, were fabricated and tested: a structural model and combustion/propulsion model. A brief historical review of the project, with salient features, typical data results, and lessons learned, is presented. An extensive number of documents were generated during the HRE Project and are listed.

  15. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. For the purposes of this Guide, large-scale Federal renewable energy projects are defined as renewable energy facilities larger than 10 megawatts (MW) that are sited on Federal property and lands and typically financed and owned by third parties.1 The U.S. Department of Energy’s Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessarymore » private capital to complete them. This Guide is intended to provide a general resource that will begin to develop the Federal employee’s awareness and understanding of the project developer’s operating environment and the private sector’s awareness and understanding of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this Guide has been organized to match Federal processes with typical phases of commercial project development. FEMP collaborated with the National Renewable Energy Laboratory (NREL) and professional project developers on this Guide to ensure that Federal projects have key elements recognizable to private sector developers and investors. The main purpose of this Guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project. This framework begins the translation between the Federal and private sector operating environments. When viewing the overall« less

  16. Transitioning from conceptual design to construction performance specification

    NASA Astrophysics Data System (ADS)

    Jeffers, Paul; Warner, Mark; Craig, Simon; Hubbard, Robert; Marshall, Heather

    2012-09-01

    On successful completion of a conceptual design review by a funding agency or customer, there is a transition phase before construction contracts can be placed. The nature of this transition phase depends on the Project's approach to construction and the particular subsystem being considered. There are generically two approaches; project retention of design authority and issuance of build to print contracts, or issuance of subsystem performance specifications with controlled interfaces. This paper relates to the latter where a proof of concept (conceptual or reference design) is translated into performance based sub-system specifications for competitive tender. This translation is not a straightforward process and there are a number of different issues to consider in the process. This paper deals with primarily the Telescope mount and Enclosure subsystems. The main subjects considered in this paper are: • Typical status of design at Conceptual Design Review compared with the desired status of Specifications and Interface Control Documents at Request for Quotation. • Options for capture and tracking of system requirements flow down from science / operating requirements and sub-system requirements, and functional requirements derived from reference design. • Requirements that may come specifically from the contracting approach. • Methods for effective use of reference design work without compromising a performance based specification. • Management of project team's expectation relating to design. • Effects on cost estimates from reference design to actual. This paper is based on experience and lessons learned through this process on both the VISTA and the ATST projects.

  17. Development of a Slow Positron Facility at Hebrew University of Jerusalem

    NASA Astrophysics Data System (ADS)

    Kelleher, Aidan

    2013-03-01

    Positron annihilation spectroscopy provides both depth of penetration to study bulk defects in materials as well as nano-scale resolution. This measurement range is achieved by slowing positrons from a radioactive source, typically 22Na, by sending them through a moderator, typically W or solid Ne. The nearly thermal positrons are then accelerated to the desired energy by means of an electrostatic potential. The SPOT project at The Hebrew University of Jerusalem proposes to increase the luminosity of the beam by applying the best practices currently in us, as well as using a short-lived source of positrons, 18F. Simulations based on our current designs indicate this project will be able to deliver positrons in the energy range of 50-50000eV with an energy resolution of 1eV is possible. We will present the unique technical challenges of using this source of positrons, how we plan to overcome them, the results of simulations, and facility construction progress.

  18. Northwest Energy Efficient Manufactured Housing Program: High Performance Manufactured Home Prototyping and Construction Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hewes, Tom; Peeks, Brady

    2013-11-01

    The Building America Partnership for Improved Residential Construction, the Bonneville Power Administration (BPA), and Northwest Energy Works (NEW), the current Northwest Energy Efficient Manufactured Housing Program (NEEM) administrator, have been collaborating to conduct research on new specifications that would improve on the energy requirements of a NEEM home. In its role as administrator, NEW administers the technical specs, performs research and engineering analysis, implements ongoing construction quality management procedures, and maintains a central database with home tracking. This project prototyped and assessed the performances of cost-effective high performance building assemblies and mechanical systems that are not commonly deployed in themore » manufacturing setting. The package of measures is able to reduce energy used for space conditioning, water heating and lighting by 50 percent over typical manufactured homes produced in the northwest.« less

  19. Northwest Energy Efficient Manufactured Housing Program: High Performance Manufactured Home Prototyping and Construction Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hewes, Tom; Peeks, Brady

    2013-11-01

    The Building America Partnership for Improved Residential Construction, the Bonneville Power Administration (BPA), and Northwest Energy Works (NEW), the current Northwest Energy Efficient Manufactured Housing Program (NEEM) administrator, have been collaborating to conduct research on new specifications that would improve on the energy requirements of a NEEM home. In its role as administrator, NEW administers the technical specs, performs research and engineering analysis, implements ongoing construction quality management procedures, and maintains a central database with home tracking. This project prototyped and assessed the performances of cost-effective high performance building assemblies and mechanical systems that are not commonly deployed in themore » manufacturing setting. The package of measures is able to reduce energy used for space conditioning, water heating and lighting by 50% over typical manufactured homes produced in the northwest.« less

  20. Two case studies: QuietRock QR-530 drywall panels in new and remediated multifamily construction

    NASA Astrophysics Data System (ADS)

    Tinianov, Brian D.

    2005-09-01

    Reliable acoustical isolation continues to be a high risk element of contemporary multifamily construction. Traditional construction techniques, offering potentially high acoustical performance, exist but may be compromised during typical construction or occupation. This paper presents two case studies using a new class of construction material-drywall panels employing constrained layer damping. QuietRock QR-530 damped gypsum board panels are used in a new construction project and as part of a remediation treatment. In a first study, QR-530 panels were used as a drywall alternative in a 2×6, semistaggered, framed wall separating luxury condominiums. Field evaluation per ASTM E36 revealed a normalized noise isolation class of 56. In a second case study, a single layer of QuietRock was applied directly to an existing single stud assembly in a resort hotel. Before and after testing yielded a change of 14 points, raising the noise isolation class from 36 to 50. This paper reviews the details of the test cases and the underlying physical principals of the subject materials.

  1. Use of structured decision-making to explicitly incorporate environmental process understanding in management of coastal restoration projects: Case study on barrier islands of the northern Gulf of Mexico.

    PubMed

    Dalyander, P Soupy; Meyers, Michelle; Mattsson, Brady; Steyer, Gregory; Godsey, Elizabeth; McDonald, Justin; Byrnes, Mark; Ford, Mark

    2016-12-01

    Coastal ecosystem management typically relies on subjective interpretation of scientific understanding, with limited methods for explicitly incorporating process knowledge into decisions that must meet multiple, potentially competing stakeholder objectives. Conversely, the scientific community lacks methods for identifying which advancements in system understanding would have the highest value to decision-makers. A case in point is barrier island restoration, where decision-makers lack tools to objectively use system understanding to determine how to optimally use limited contingency funds when project construction in this dynamic environment does not proceed as expected. In this study, collaborative structured decision-making (SDM) was evaluated as an approach to incorporate process understanding into mid-construction decisions and to identify priority gaps in knowledge from a management perspective. The focus was a barrier island restoration project at Ship Island, Mississippi, where sand will be used to close an extensive breach that currently divides the island. SDM was used to estimate damage that may occur during construction, and guide repair decisions within the confines of limited availability of sand and funding to minimize adverse impacts to project objectives. Sand was identified as more limiting than funds, and unrepaired major breaching would negatively impact objectives. Repairing minor damage immediately was determined to be generally more cost effective (depending on the longshore extent) than risking more damage to a weakened project. Key gaps in process-understanding relative to project management were identified as the relationship of island width to breach formation; the amounts of sand lost during breaching, lowering, or narrowing of the berm; the potential for minor breaches to self-heal versus developing into a major breach; and the relationship between upstream nourishment and resiliency of the berm to storms. This application is a prototype for using structured decision-making in support of engineering projects in dynamic environments where mid-construction decisions may arise; highlights uncertainty about barrier island physical processes that limit the ability to make robust decisions; and demonstrates the potential for direct incorporation of process-based models in a formal adaptive management decision framework. Published by Elsevier Ltd.

  2. Use of structured decision-making to explicitly incorporate environmental process understanding in management of coastal restoration projects: Case study on barrier islands of the northern Gulf of Mexico

    USGS Publications Warehouse

    Dalyander, P. Soupy; Meyers, Michelle B.; Mattsson, Brady; Steyer, Gregory; Godsey, Elizabeth; McDonald, Justin; Byrnes, Mark R.; Ford, Mark

    2016-01-01

    Coastal ecosystem management typically relies on subjective interpretation of scientific understanding, with limited methods for explicitly incorporating process knowledge into decisions that must meet multiple, potentially competing stakeholder objectives. Conversely, the scientific community lacks methods for identifying which advancements in system understanding would have the highest value to decision-makers. A case in point is barrier island restoration, where decision-makers lack tools to objectively use system understanding to determine how to optimally use limited contingency funds when project construction in this dynamic environment does not proceed as expected. In this study, collaborative structured decision-making (SDM) was evaluated as an approach to incorporate process understanding into mid-construction decisions and to identify priority gaps in knowledge from a management perspective. The focus was a barrier island restoration project at Ship Island, Mississippi, where sand will be used to close an extensive breach that currently divides the island. SDM was used to estimate damage that may occur during construction, and guide repair decisions within the confines of limited availability of sand and funding to minimize adverse impacts to project objectives. Sand was identified as more limiting than funds, and unrepaired major breaching would negatively impact objectives. Repairing minor damage immediately was determined to be generally more cost effective (depending on the longshore extent) than risking more damage to a weakened project. Key gaps in process-understanding relative to project management were identified as the relationship of island width to breach formation; the amounts of sand lost during breaching, lowering, or narrowing of the berm; the potential for minor breaches to self-heal versus developing into a major breach; and the relationship between upstream nourishment and resiliency of the berm to storms. This application is a prototype for using structured decision-making in support of engineering projects in dynamic environments where mid-construction decisions may arise; highlights uncertainty about barrier island physical processes that limit the ability to make robust decisions; and demonstrates the potential for direct incorporation of process-based models in a formal adaptive management decision framework.

  3. Unique Construction and Social Experiences in Residential Remediation Sites - 13423

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Jung, Paul; Scarborough, Rebecca

    2013-07-01

    Sevenson Environmental Services, Inc., (Sevenson) has performed several radiological remediation projects located in residential urban areas. Over the course of these projects, there has been a wide variety of experiences encountered from construction related issues to unique social situations. Some of the construction related issues included the remediation of interior basements where contaminated material was located under the footers of the structure or was used in the mortar between cinder block or field stone foundations. Other issues included site security, maintaining furnaces or other utilities, underpinning, backfilling and restoration. In addition to the radiological hazards associated with this work theremore » were occupational safety and industrial hygiene issues that had to be addressed to ensure the safety and health of neighboring properties and residents. The unique social situations at these job sites have included arson, theft/stolen property, assault/battery, prostitution, execution of arrest warrants for residents, discovery of drugs and paraphernalia, blood borne pathogens, and unexploded ordnance. Some of these situations have become a sort of comical urban legend throughout the organization. One situation had historical significance, involving the demolition of a house to save a tree older than the Declaration of Independence. All of these projects typically involve the excavation of early 20. century items such as advertisement signs, various old bottles (milk, Listerine, perfume, whisky) and other miscellaneous common trash items. (authors)« less

  4. Advanced technology applications for second and third general coal gasification systems

    NASA Technical Reports Server (NTRS)

    Bradford, R.; Hyde, J. D.; Mead, C. W.

    1980-01-01

    The historical background of coal conversion is reviewed and the programmatic status (operational, construction, design, proposed) of coal gasification processes is tabulated for both commercial and demonstration projects as well as for large and small pilot plants. Both second and third generation processes typically operate at higher temperatures and pressures than first generation methods. Much of the equipment that has been tested has failed. The most difficult problems are in process control. The mechanics of three-phase flow are not fully understood. Companies participating in coal conversion projects are ordering duplicates of failure prone units. No real solutions to any of the significant problems in technology development have been developed in recent years.

  5. Assessment of an alternative housing reconstruction policy after the 1995 Grevena-Kozani (N.Greece) earthquake: Construction of standardized units in private lots

    NASA Astrophysics Data System (ADS)

    Mousteraki, K.; Dandoulaki, M.; Symeonidis, S.

    2009-04-01

    In Greece, the reconstruction of earthquake damaged building stock is technically and financially supported by the state. Housing reconstruction typically comprises three subsequent phases that is emergency shelter, temporary housing and permanent housing in buildings after their reconstruction. The latter is based on financial support by the state to the owner for the repair or reconstruction of each individual building. A different approach was tried after the 1995 Kozani-Grevena (N.Greece) earthquake. The earthquake (M=6.6) affected mainly the countryside of the two prefectures and devastated a great number of small settlements with aged and decreasing population. The experience from the 1986 Kalamata earthquake had demonstrated that low income and elderly households had difficulties in using reconstruction loans and tented to remain longer in temporary housing. In an attempt to take in the Kalamata experience and the development features of the disaster area, certain categories of homeless households were offered the choice to select either the typical financial and technical support to reconstruct their damaged house under their own responsibility or a small standard house (50 to 60m2) constructed by the state in their lot. About 4,000 housing units were constructed in villages all over the disaster area. The paper focuses on this new housing policy. It presents the institutional framework, the procedures for the selection of eligible households, the geography of the constructed housing units, issues of project management and involved costs. It also attempts to highlight strong and weak points of the new approach and to make some comparisons with the long-established approach to recovery of damaged building stock. The overall conclusion is that despite huge complexities in project management and higher costs, this new policy contributed in retaining the population and enhancing development in the area.

  6. Cancer Research Center Indiana University School of Medicine

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-08-01

    The Department of Energy (DOE) proposes to authorize the Indiana School of Medicine to proceed with the detailed design, construction and equipping of the proposed Cancer Research Center (CRC). A grant was executed with the University on April 21, 1992. A four-story building with basement would be constructed on the proposed site over a 24-month period. The proposed project would bring together, in one building, three existing hematology/oncology basic research programs, with improved cost-effectiveness through the sharing of common resources. The proposed site is currently covered with asphaltic pavement and is used as a campus parking lot. The surrounding areamore » is developed campus, characterized by buildings, walkways, with minimal lawns and plantings. The proposed site has no history of prior structures and no evidence of potential sources of prior contamination of the soil. Environmental impacts of construction would be limited to minor increases in traffic, and the typical noises associated with standard building construction. The proposed CRC project operation would involve the use radionuclides and various hazardous materials in conducting clinical studies. Storage, removal and disposal of hazardous wastes would be managed under existing University programs that comply with federal and state requirements. Radiological safety programs would be governed by Nuclear Regulatory Commission (NRC) license and applicable Environmental Protection Agency (EPA) regulations. There are no other NEPA reviews currently active which are in relationship to this proposed site. The proposed project is part of a Medical Campus master plan and is consistent with applicable local zoning and land use requirements.« less

  7. METC Clean Coal Technology status -- 1995 update

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Carpenter, L.K.

    1995-06-01

    The Department of Energy (DOE) Clean Coal Technology (CCT) Program is assisting the private sector by funding demonstration programs to validate that CCT technologies are a low-risk, environmentally attractive, cost-competitive option for utility and industrial users. Since 1987, DOE has awarded 45 CCT projects worth a total value of $7 billion (including more than $2.3 billion of DOE funding). Within the CCT Program, the Morgantown Energy Technology Center (METC) is responsible for 17 advanced power generation systems and major industrial applications. METC is an active partner in advancement of these technologies via direct CCT funding and via close cooperation andmore » coordination of internal and external research and development activities. By their nature, METC projects are typically 6-10 years in duration and, in some cases, very complex in nature. However, as a result of strong commercial partnerships, progress in the development and commercialization of major utility and industrial projects has, and will continue to occur. It is believed that advanced power generation systems and industrial applications are on the brink of commercial deployment. A status of METC CCT activities will be presented. Two projects have completed their operational phase, operations are underway at one project (two others are in the latter stages of construction/shakedown), four projects are in construction, six restructured. Also, present a snapshot of development activities that are an integral part of the advancement of these CCT initiatives will be presented.« less

  8. Environmental impact of emissions from incineration plants in comparison to typical heating systems

    NASA Astrophysics Data System (ADS)

    Wielgosiński, Grzegorz; Namiecińska, Olga; Czerwińska, Justyna

    2018-01-01

    In recent years, five modern municipal waste incineration plants have been built in Poland. Next ones are being constructed and at the same time building of several others is being considered. Despite positive experience with the operation of the existing installations, each project of building a new incinerator raises a lot of emotions and social protests. The main argument against construction of an incineration plant is the emission of pollutants. The work compares emissions from municipal waste incineration plants with those from typical heating plants: in the first part, for comparison large heating plants equipped with pulverized coal-fired boilers (OP-140), stoker-fired boilers (three OR-32 boilers) or gas blocks with heat output of about 100 MW have been selected, while the second part compares WR-10 and WR-25 stoker-fired boilers most popular in our heating industry with thermal treatment systems for municipal waste or refuse-derived-fuel (RDF) with similar heat output. Both absolute emission and impact - immission of pollutants in vicinity of the plant were analyzed.

  9. An Inexpensive Biophysics Laboratory Apparatus for Acquiring Pulmonary Function Data with Clinical Applications

    NASA Astrophysics Data System (ADS)

    Harkay, Gregory

    2001-11-01

    Interest on the part of the Physics Department at KSC in developing a computer interfaced lab with appeal to biology majors and a need to perform a clinical pulmonological study to fulfill a biology requirement led to the author's undergraduate research project in which a recording spirometer (typical cost: $15K) was constructed from readily available materials and a typical undergraduate lab computer interface. Simple components, including a basic photogate circuit, CPU fan, and PVC couplings were used to construct an instrument for measuring flow rates as a function of time. Pasco software was used to build an experiment in which data was collected and integration performed such that one could obtain accurate values for FEV1 (forced expiratory volume for one second) and FVC (forced vital capacity) and their ratio for a large sample of subjects. Results were compared to published norms and subjects with impaired respiratory mechanisms identified. This laboratory exercise is one with which biology students can clearly identify and would be a robust addition to the repertoire for a HS or college physics or biology teaching laboratory.

  10. Developing Renewable Energy Projects Larger Than 10 MWs at Federal Facilities (Book)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2013-03-01

    To accomplish Federal goals for renewable energy, sustainability, and energy security, large-scale renewable energy projects must be developed and constructed on Federal sites at a significant scale with significant private investment. The U.S. Department of Energy's Federal Energy Management Program (FEMP) helps Federal agencies meet these goals and assists agency personnel navigate the complexities of developing such projects and attract the necessary private capital to complete them. This guide is intended to provide a general resource that will begin to develop the Federal employee's awareness and understanding of the project developer's operating environment and the private sector's awareness and understandingmore » of the Federal environment. Because the vast majority of the investment that is required to meet the goals for large-scale renewable energy projects will come from the private sector, this guide has been organized to match Federal processes with typical phases of commercial project development. The main purpose of this guide is to provide a project development framework to allow the Federal Government, private developers, and investors to work in a coordinated fashion on large-scale renewable energy projects. The framework includes key elements that describe a successful, financially attractive large-scale renewable energy project.« less

  11. Synchronized Trajectories in a Climate "Supermodel"

    NASA Astrophysics Data System (ADS)

    Duane, Gregory; Schevenhoven, Francine; Selten, Frank

    2017-04-01

    Differences in climate projections among state-of-the-art models can be resolved by connecting the models in run-time, either through inter-model nudging or by directly combining the tendencies for corresponding variables. Since it is clearly established that averaging model outputs typically results in improvement as compared to any individual model output, averaged re-initializations at typical analysis time intervals also seems appropriate. The resulting "supermodel" is more like a single model than it is like an ensemble, because the constituent models tend to synchronize even with limited inter-model coupling. Thus one can examine the properties of specific trajectories, rather than averaging the statistical properties of the separate models. We apply this strategy to a study of the index cycle in a supermodel constructed from several imperfect copies of the SPEEDO model (a global primitive-equation atmosphere-ocean-land climate model). As with blocking frequency, typical weather statistics of interest like probabilities of heat waves or extreme precipitation events, are improved as compared to the standard multi-model ensemble approach. In contrast to the standard approach, the supermodel approach provides detailed descriptions of typical actual events.

  12. Housing improvement projects in Indonesia: responding to local demand.

    PubMed

    Josodipoero, R I

    2003-06-01

    For more than three decades, environmental health programmes in Indonesia have emphasized prevention and treatment of the high incidence of disease among villagers. One of the main causes of disease is the unhygienic conditions of typical rural houses - two-room constructions with dirt floors and walls of lightly fired bricks or woven bamboo skins. While most houses have few or no windows, the occupants frequently cook, eat, sleep and even keep animals in a single room. The main objective of the housing improvement programme was to improve air circulation and introduce more sunlight to kill bacteria, avoid dampness and eliminate smoke from cooking. The programme encourages villagers to construct a permanent floor, enlarge existing windows or insert new windows for good ventilation. This presentation will share the 'success stories' of housing improvement projects in Indonesia that adopted demand-responsive approaches instead of the conventional 'supply approach'. Through exercises like Wealth Classification and Social Mapping, a demand-responsive approach lets the community decide who is eligible for assistance, resulting in higher participation and accurate information on community demand and on materials needed. In addition to the successes, the failures will be discussed at field level. This presentation will discuss the lessons learned from: the World Bank-funded Kalisemut Case Study; government's Family Welfare Movement; Plan International's project in Yogyakarta, and AusAID-funded Sustainable Development through Community Participation Project in Lombok.

  13. The Bears Family Projective Test: evaluating stories of children with emotional difficulties.

    PubMed

    Iandolo, Giuseppe; Esposito, Gianluca; Venuti, Paola

    2012-06-01

    The aim of this study was to describe and analyze the storytelling of children with emotional difficulties. Forty children with emotional and relational difficulties (inhibited and impulsive), ages between 5.5 and 9.4 years old, were assessed by a multiaxial procedure and the bears family projective test. The bears family test is a constructive-thematic-projective method based on an anthropomorphic family of bears that children can manipulate to tell a story. The stories of 40 children without emotional difficulties (matched by IQ, socio-economic status, and gender) and 322 typically developing children, aged between four and 10 years old, were used as a reference for comparisons. Results indicated that the stories of children with emotional difficulties showed many unsolved problematic events, unclear characters, negative relationships, and negative behaviors. Unlike the stories of children without emotional difficulties, positive contents didn't prevail over negative, and there wasn't a positive compensation for negative elements.

  14. Greenhouse Gas Emissions from Asphalt Pavement Construction: A Case Study in China

    PubMed Central

    Ma, Feng; Sha, Aimin; Lin, Ruiyu; Huang, Yue; Wang, Chao

    2016-01-01

    In China, the construction of asphalt pavement has a significant impact on the environment, and energy use and greenhouse gas (GHG) emissions from asphalt pavement construction have been receiving increasing attention in recent years. At present, there is no universal criterion for the evaluation of GHG emissions in asphalt pavement construction. This paper proposes to define the system boundaries for GHG emissions from asphalt pavement by using a process-based life cycle assessment method. A method for evaluating GHG emissions from asphalt pavement construction is suggested. The paper reports a case study of GHG emissions from a typical asphalt pavement construction project in China. The results show that the greenhouse gas emissions from the mixture mixing phase are the highest, and account for about 54% of the total amount. The second highest GHG emission phase is the production of raw materials. For GHG emissions of cement stabilized base/subbase, the production of raw materials emits the most, about 98%. The GHG emission for cement production alone is about 92%. The results indicate that any measures to reduce GHG emissions from asphalt pavement construction should be focused on the raw materials manufacturing stage. If the raw materials production phase is excluded, the measures to reduce GHG emissions should be aimed at the mixture mixing phase. PMID:27011196

  15. Greenhouse Gas Emissions from Asphalt Pavement Construction: A Case Study in China.

    PubMed

    Ma, Feng; Sha, Aimin; Lin, Ruiyu; Huang, Yue; Wang, Chao

    2016-03-22

    In China, the construction of asphalt pavement has a significant impact on the environment, and energy use and greenhouse gas (GHG) emissions from asphalt pavement construction have been receiving increasing attention in recent years. At present, there is no universal criterion for the evaluation of GHG emissions in asphalt pavement construction. This paper proposes to define the system boundaries for GHG emissions from asphalt pavement by using a process-based life cycle assessment method. A method for evaluating GHG emissions from asphalt pavement construction is suggested. The paper reports a case study of GHG emissions from a typical asphalt pavement construction project in China. The results show that the greenhouse gas emissions from the mixture mixing phase are the highest, and account for about 54% of the total amount. The second highest GHG emission phase is the production of raw materials. For GHG emissions of cement stabilized base/subbase, the production of raw materials emits the most, about 98%. The GHG emission for cement production alone is about 92%. The results indicate that any measures to reduce GHG emissions from asphalt pavement construction should be focused on the raw materials manufacturing stage. If the raw materials production phase is excluded, the measures to reduce GHG emissions should be aimed at the mixture mixing phase.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Staunton 1 Reclamation Demonstration Project involves an evaluation of the reclamation process for a deep coal mine refuse system. A typical abandoned midwestern deep coal mine refuse site was selected, final land use was determined, baseline data were collected, engineering plans were developed and implemented, and a post-construction evaluation was begun. The project is a cooperative effort by two state agencies--the Abandoned Mined Land Reclamation Council of Illinois the Illinois Institute for Environmental Quality--and the U.S. Department of Energy through the Land Reclamation Program at Argonne National Laboratory. Current investigations are monitoring groundwater, surface water quality, aquatic ecosystems, revegetation,more » soil characteristics, erosion and runoff, soil microbial and soil fauna populations, wildlife, and economic effects of the reclamation effort. The research is a multidisciplinary approach to the concept of ecosystem response to reclamation.« less

  17. 19. CONSTRUCTION PROGRESS PHOTO SHOWING (TYPICALLY COMPLEX) WASTE HOLDING CELL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. CONSTRUCTION PROGRESS PHOTO SHOWING (TYPICALLY COMPLEX) WASTE HOLDING CELL PIPING. INEEL PHOTO NUMBER NRTS-59-3212. - Idaho National Engineering Laboratory, Old Waste Calcining Facility, Scoville, Butte County, ID

  18. 2. TYPICAL OVERHEAD WIRE CONSTRUCTION CURVE GUY WIRE ARRANGEMENT ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    2. TYPICAL OVERHEAD WIRE CONSTRUCTION - CURVE GUY WIRE ARRANGEMENT (ABANDONED WEST LEG OF WYE AT SIXTH AVENUE AND PINE STREET) - Yakima Valley Transportation Company Interurban Railroad, Trackage, Yakima, Yakima County, WA

  19. Theoretical framework of the causes of construction time and cost overruns

    NASA Astrophysics Data System (ADS)

    Ullah, K.; Abdullah, A. H.; Nagapan, S.; Suhoo, S.; Khan, M. S.

    2017-11-01

    Any construction practitioner fundamental goal is to complete the projects within estimated duration and budgets, and expected quality targets. However, time and cost overruns are regular and universal phenomenon in construction projects and the construction projects in Malaysia has no exemption from the problems of time overrun and cost overrun. In order to accomplish the successful completion of construction projects on specified time and within planned cost, there are various factors that should be given serious attention so that issues such as time and cost overrun can be addressed. This paper aims to construct a framework for the causes of time overrun and cost overrun in construction projects of Malaysia. Based on the relevant literature review, causative factors of time overrun and cost overrun in Malaysian construction projects are summarized and the theoretical frameworks of the causes of construction time overrun and cost overrun is constructed. The developed frameworks for construction time and cost overruns based on the existing literature will assist the construction practitioners to plan the efficient approaches for achieving successful completion of the projects.

  20. Technology Solutions for New Manufactured Homes: Idaho, Oregon, and Washington Manufactured Home Builders (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2013-11-01

    The Building America Partnership for Improved Residential Construction, the Bonneville Power Administration (BPA), and Northwest Energy Works (NEW), the current Northwest Energy Efficient Manufactured Housing Program (NEEM) administrator, have been collaborating to conduct research on new specifications that would improve on the energy requirements of a NEEM home. In its role as administrator, NEW administers the technical specs, performs research and engineering analysis, implements ongoing construction quality management procedures, and maintains a central database with home tracking. This project prototyped and assessed the performances of cost-effective high performance building assemblies and mechanical systems that are not commonly deployed in themore » manufacturing setting. The package of measures is able to reduce energy used for space conditioning, water heating and lighting by 50 percent over typical manufactured homes produced in the northwest.« less

  1. Building the Scientific Modeling Assistant: An interactive environment for specialized software design

    NASA Technical Reports Server (NTRS)

    Keller, Richard M.

    1991-01-01

    The construction of scientific software models is an integral part of doing science, both within NASA and within the scientific community at large. Typically, model-building is a time-intensive and painstaking process, involving the design of very large, complex computer programs. Despite the considerable expenditure of resources involved, completed scientific models cannot easily be distributed and shared with the larger scientific community due to the low-level, idiosyncratic nature of the implemented code. To address this problem, we have initiated a research project aimed at constructing a software tool called the Scientific Modeling Assistant. This tool provides automated assistance to the scientist in developing, using, and sharing software models. We describe the Scientific Modeling Assistant, and also touch on some human-machine interaction issues relevant to building a successful tool of this type.

  2. 42 CFR 137.332 - On what basis may the Secretary reject a final construction project proposal?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... face clearly demonstrates that the construction project cannot be completed as proposed. (b) For construction programs proposed to be included in a construction project agreement, the Secretary may also... construction project proposal? 137.332 Section 137.332 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...

  3. [Defence mechanisms and coping strategies in men and women: a comparative and structural study based on the artistic production of people suffering from a break-up of their life project].

    PubMed

    Schiltz, L; Ciccarello, A; Ricci-Boyer, L; Schiltz, J

    2013-01-01

    A comparative study of men and women suffering from a break-up of their life project allowed us examining the typically female and male manners to cope with trauma, anxiety, guilt, depression and internal destructivity. In a first stage, an exploratory study was focussed on 206 subjects, belonging to several clinical subgroups: people living in great precarity and long-term unemployed people, asylum seekers and refugees, drug addicts, prisoners and people coming out of prison. Secondly, arts therapeutic sessions were proposed with the aim of helping the participants finding an outlet to their situation. The artistic production (drawings and stories induced by music) was analysed with the help of original rating scales, constructed in a phenomenological and structural perspective. We will present a synthesis of our qualitative observations, as well as some results of typological and structural studies, computed with the help of non parametric statistical procedures on the data of N = 93 participants. The results allow us pointing to gender differences and defining typically male and female coping styles. Differential indications for psychotherapy can be extracted from these analyses.

  4. Experimental and Numerical Simulation Analysis of Typical Carbon Woven Fabric/Epoxy Laminates Subjected to Lightning Strike

    NASA Astrophysics Data System (ADS)

    Yin, J. J.; Chang, F.; Li, S. L.; Yao, X. L.; Sun, J. R.; Xiao, Y.

    2017-12-01

    To clarify the evolution of damage for typical carbon woven fabric/epoxy laminates exposed to lightning strike, artificial lightning testing on carbon woven fabric/epoxy laminates were conducted, damage was assessed using visual inspection and damage peeling approaches. Relationships between damage size and action integral were also elucidated. Results showed that damage appearance of carbon woven fabric/epoxy laminate presents circular distribution, and center of the circle located at the lightning attachment point approximately, there exist no damage projected area dislocations for different layers, visual damage territory represents maximum damage scope; visible damage can be categorized into five modes: resin ablation, fiber fracture and sublimation, delamination, ablation scallops and block-shaped ply-lift; delamination damage due to resin pyrolysis and internal pressure exist obvious distinguish; project area of total damage is linear with action integral for the same type specimens, that of resin ablation damage is linear with action integral, but no correlation with specimen type, for all specimens, damage depth is linear with logarithm of action integral. The coupled thermal-electrical model constructed is capable to simulate the ablation damage for carbon woven fabric/epoxy laminates exposed to simulated lightning current through experimental verification.

  5. Exploitation and Benefits of BIM in Construction Project Management

    NASA Astrophysics Data System (ADS)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  6. Virtual design and construction of plumbing systems

    NASA Astrophysics Data System (ADS)

    Filho, João Bosco P. Dantas; Angelim, Bruno Maciel; Guedes, Joana Pimentel; de Castro, Marcelo Augusto Farias; Neto, José de Paula Barros

    2016-12-01

    Traditionally, the design coordination process is carried out by overlaying and comparing 2D drawings made by different project participants. Detecting information errors from a composite drawing is especially challenging and error prone. This procedure usually leaves many design errors undetected until construction begins, and typically lead to rework. Correcting conflict issues, which were not identified during design and coordination phase, reduces the overall productivity for everyone involved in the construction process. The identification of construction issues in the field generate Request for Information (RFIs) that is one of delays causes. The application of Virtual Design and Construction (VDC) tools to the coordination processes can bring significant value to architecture, structure, and mechanical, electrical, and plumbing (MEP) designs in terms of a reduced number of errors undetected and requests for information. This paper is focused on evaluating requests for information (RFI) associated with water/sanitary facilities of a BIM model. Thus, it is expected to add improvements of water/sanitary facility designs, as well as to assist the virtual construction team to notice and identify design problems. This is an exploratory and descriptive research. A qualitative methodology is used. This study adopts RFI's classification in six analyzed categories: correction, omission, validation of information, modification, divergence of information and verification. The results demonstrate VDC's contribution improving the plumbing system designs. Recommendations are suggested to identify and avoid these RFI types in plumbing system design process or during virtual construction.

  7. 42 CFR 137.362 - May construction project agreements be amended?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May construction project agreements be amended? 137... of the Secretary in Establishing and Implementing Construction Project Agreements § 137.362 May construction project agreements be amended? Yes, the Self-Governance Tribe, at its discretion, may request the...

  8. What are the effects of Agro-Ecological Zones and land use region boundaries on land resource projection using the Global Change Assessment Model?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Di Vittorio, Alan V.; Kyle, Page; Collins, William D.

    Understanding the potential impacts of climate change is complicated by mismatched spatial representations between gridded Earth System Models (ESMs) and Integrated Assessment Models (IAMs), whose regions are typically larger and defined by geopolitical and biophysical criteria. In this study we address uncertainty stemming from the construction of land use regions in an IAM, the Global Change Assessment Model (GCAM), whose regions are currently based on historical climatic conditions (1961-1990). We re-define GCAM’s regions according to projected climatic conditions (2070-2099), and investigate how this changes model outcomes for land use, agriculture, and forestry. By 2100, we find potentially large differences inmore » projected global and regional area of biomass energy crops, fodder crops, harvested forest, and intensive pasture. These land area differences correspond with changes in agricultural commodity prices and production. These results have broader implications for understanding policy scenarios and potential impacts, and for evaluating and comparing IAM and ESM simulations.« less

  9. 25 CFR 900.113 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... contract. This does not involve construction project management as defined in paragraph (d) of this section...) Construction project management means direct responsibility for the construction project through day-to-day on-site management and administration of the project. Activities may include cost management, project...

  10. Locally adaptive, spatially explicit projection of US population for 2030 and 2050.

    PubMed

    McKee, Jacob J; Rose, Amy N; Bright, Edward A; Huynh, Timmy; Bhaduri, Budhendra L

    2015-02-03

    Localized adverse events, including natural hazards, epidemiological events, and human conflict, underscore the criticality of quantifying and mapping current population. Building on the spatial interpolation technique previously developed for high-resolution population distribution data (LandScan Global and LandScan USA), we have constructed an empirically informed spatial distribution of projected population of the contiguous United States for 2030 and 2050, depicting one of many possible population futures. Whereas most current large-scale, spatially explicit population projections typically rely on a population gravity model to determine areas of future growth, our projection model departs from these by accounting for multiple components that affect population distribution. Modeled variables, which included land cover, slope, distances to larger cities, and a moving average of current population, were locally adaptive and geographically varying. The resulting weighted surface was used to determine which areas had the greatest likelihood for future population change. Population projections of county level numbers were developed using a modified version of the US Census's projection methodology, with the US Census's official projection as the benchmark. Applications of our model include incorporating multiple various scenario-driven events to produce a range of spatially explicit population futures for suitability modeling, service area planning for governmental agencies, consequence assessment, mitigation planning and implementation, and assessment of spatially vulnerable populations.

  11. Examining the Challenging Hindrances facing in the Construction Projects: South India’s Perspective

    NASA Astrophysics Data System (ADS)

    Subramanyam, K.; Haridharan, M. K.

    2017-07-01

    Developing countries like India require a huge infrastructure to facilitate needs of the people. Construction industry provides several opportunities to the individuals. Construction manager work is to supervise and organize the construction activities in construction projects. Now a day construction manager facing challenges. This paper aimed to study the challenges facing by the construction manager in the perception of construction professionals. 39 variables were taken from the literature review which found to be severe impact on construction managers’ performance. Construction manager, project manager and site engineers are the respondents for this survey. Using SPSS, regression analysis was done and recognized significant challenges. These challenges were classified into 5 domains. In management challenges, resource availability and allocation, risks and uncertainties existing in the project onsite, top management support and cost constraints are the most significant variables. In skills requirement of a construction manager challenges, technical skills required to learn and adapt new technology in the project, decision making and planning according to the situation in site are the most significant variables. In performance challenges, implementation of tasks according to the plan is the important variable whereas in onsite challenges, manage project risks, develop project policies and procedures are the most important.

  12. The use of local natural stone in construction of St. Petersburg region and south-east Finland

    NASA Astrophysics Data System (ADS)

    Luodes, Hannu; Härmä, Paavo; Panova, Elena; Pirinen, Heikki; Selonen, Olavi

    2013-04-01

    A three-year project, started in 2012, "Efficient use of natural stone in the Leningrad region and South-East Finland", studies the use and durability of natural stone in the city environments in the Nordic climate and especially along the Eastern Baltic Sea coastline between Helsinki and St. Petersburg. The project is lead by the Geological Survey of Finland (GTK) and the partners in the project are Saimaa University of Applied Sciences from Finland and Federal State Unitary Enterprise "Petersburg Complex Geological Expedition" Russian together with Saint-Petersburg State University from the Russian Federation. As associates in this project are also natural stone companies from Finland, Ylämaa Group Oy and Palin Granit Oy. The project is co-funded by the European Union, the Russian Federation and the Republic of Finland through the European Neighbourhood and Partnership Instrument (ENPI). A great potential of natural stone that can be used in construction is located in the border zone between South-East Finland and the Leningrad region. Rapakivi granite from that area has been utilized for several important buildings worldwide since 18th century and the area holds still potential for future economic growth. The use of the stone particularly from this area is based on its visual expression and good properties with high durability and long life cycle that can be used as arguments in the future development. Strengthening of the knowledge of the material reserves in the area gives a long term basement for economic development. Special aim of the project is to promote the use of natural stone in the city construction, especially the use of left-over stone generated in the production. In the project the use of natural stone in larger cities from the 18th century until today including the towns St. Petersburg, Vyborg, Helsinki, Kuopio and Kotka will be reported. Also an analysis of the near future needs of natural stone (qualities and quantities) in reconstruction and construction in the southern Finland and St. Petersburg regions will be documented. That is to generate ideas for definition of new environmental building products using left-over natural stone from quarrying. The project will provide detailed data about long term durability of stone structures in the cities that are along the Baltic Sea shoreline (St. Petersburg, Helsinki) and subject to both mechanical and biological weathering. Mechanical weathering by several annual freeze-thaw cycles is especially typical in these coastal climate conditions. The data will be used in characterization of the durability and weathering mechanisms of different stone types and is used in preparation of guidelines of stone selection for construction and renovation. The data on natural stone resources in the project area will be evaluated and collected in a database. Also the best natural stone evaluation methods from Finland and Russia will be assessed to produce a guidance of best practices for prospecting and evaluation of natural stone occurrences. The project will also generate suggestions for making the natural stone trade between the EU and Russia easier.

  13. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  14. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  15. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  16. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  17. 48 CFR 236.274 - Restriction on acquisition of steel for use in military construction projects.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... of steel for use in military construction projects. 236.274 Section 236.274 Federal Acquisition....274 Restriction on acquisition of steel for use in military construction projects. In accordance with..., Division E), do not acquire, or allow a contractor to acquire, steel for any construction project or...

  18. Construction Cost Growth for New Department of Energy Nuclear Facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kubic, Jr., William L.

    Cost growth and construction delays are problems that plague many large construction projects including the construction of new Department of Energy (DOE) nuclear facilities. A study was conducted to evaluate cost growth of large DOE construction projects. The purpose of the study was to compile relevant data, consider the possible causes of cost growth, and recommend measures that could be used to avoid extreme cost growth in the future. Both large DOE and non-DOE construction projects were considered in this study. With the exception of Chemical and Metallurgical Research Building Replacement Project (CMRR) and the Mixed Oxide Fuel Fabrication Facilitymore » (MFFF), cost growth for DOE Nuclear facilities is comparable to the growth experienced in other mega construction projects. The largest increase in estimated cost was found to occur between early cost estimates and establishing the project baseline during detailed design. Once the project baseline was established, cost growth for DOE nuclear facilities was modest compared to non-DOE mega projects.« less

  19. Mapping of information and identification of construction waste at project life cycle

    NASA Astrophysics Data System (ADS)

    Wibowo, Mochamad Agung; Handayani, Naniek Utami; Nurdiana, Asri; Sholeh, Moh Nur; Pamungkas, Gita Silvia

    2018-03-01

    The development of construction project towards green construction is needed in order to improve the efficiency of construction projects. One that needs to be minimized is construction waste. Construction waste is waste generated from construction project activities, both solid waste and non solid waste. More specifically, the waste happens at every phase of the project life cycle. Project life cycle are the stage of idea, design, construction, and operation/maintenance. Each phase is managed by different stakeholders. Therefore it requires special handling from the involved stakeholders. The objective of the study is to map the information and identify the waste at each phase of the project life cycle. The purpose of mapping is to figure out the process of information and product flow and with its timeline. This mapping used Value Stream Mapping (VSM). Identification of waste was done by distributing questionnaire to respondents to know the waste according to owner, consultant planner, contractor, and supervisory consultant. The result of the study is the mapping of information flow and product flow at the phases of idea, design, construction, and operation/ maintenance.

  20. New Whole-House Solutions Case Study: Technology Solutions for New Manufactured Homes, Idaho, Oregon, and Washington

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BA-PIRC

    2013-11-01

    The Building America Partnership for Improved Residential Construction, the Bonneville Power Administration (BPA), and Northwest Energy Works (NEW), the current Northwest Energy Efficient Manufactured Housing Program (NEEM) administrator, have been collaborating to conduct research on new specifications that would improve on the energy requirements of a NEEM home. In its role as administrator, NEW administers the technical specs, performs research and engineering analysis, implements ongoing construction quality management procedures, and maintains a central database with home tracking. This project prototyped and assessed the performances of cost-effective high performance building assemblies and mechanical systems that are not commonly deployed in themore » manufacturing setting. The package of measures is able to reduce energy used for space conditioning, water heating and lighting by 50 percent over typical manufactured homes produced in the northwest.« less

  1. Technical Support Document: Development of the Advanced Energy Design Guide for Large Hospitals - 50% Energy Savings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bonnema, E.; Leach, M.; Pless, S.

    2013-06-01

    This Technical Support Document describes the process and methodology for the development of the Advanced Energy Design Guide for Large Hospitals: Achieving 50% Energy Savings Toward a Net Zero Energy Building (AEDG-LH) ASHRAE et al. (2011b). The AEDG-LH is intended to provide recommendations for achieving 50% whole-building energy savings in large hospitals over levels achieved by following Standard 90.1-2004. The AEDG-LH was created for a 'standard' mid- to large-size hospital, typically at least 100,000 ft2, but the strategies apply to all sizes and classifications of new construction hospital buildings. Its primary focus is new construction, but recommendations may be applicablemore » to facilities undergoing total renovation, and in part to many other hospital renovation, addition, remodeling, and modernization projects (including changes to one or more systems in existing buildings).« less

  2. Concept mapping and network analysis: an analytic approach to measure ties among constructs.

    PubMed

    Goldman, Alyssa W; Kane, Mary

    2014-12-01

    Group concept mapping is a mixed-methods approach that helps a group visually represent its ideas on a topic of interest through a series of related maps. The maps and additional graphics are useful for planning, evaluation and theory development. Group concept maps are typically described, interpreted and utilized through points, clusters and distances, and the implications of these features in understanding how constructs relate to one another. This paper focuses on the application of network analysis to group concept mapping to quantify the strength and directionality of relationships among clusters. The authors outline the steps of this analysis, and illustrate its practical use through an organizational strategic planning example. Additional benefits of this analysis to evaluation projects are also discussed, supporting the overall utility of this supplemental technique to the standard concept mapping methodology. Copyright © 2014 Elsevier Ltd. All rights reserved.

  3. Status and Plans for the FLARE (Facility for Laboratory Reconnection Experiments) Project

    NASA Astrophysics Data System (ADS)

    Ji, H.; Bhattacharjee, A.; Prager, S.; Daughton, W.; Bale, S.; Carter, T.; Crocker, N.; Drake, J.; Egedal, J.; Sarff, J.; Wallace, J.; Chen, Y.; Cutler, R.; Fox, W.; Heitzenroeder, P.; Kalish, M.; Jara-Almonte, J.; Myers, C.; Ren, Y.; Yamada, M.; Yoo, J.

    2015-11-01

    The FLARE device (flare.pppl.gov) is a new intermediate-scale plasma experiment under construction at Princeton to study magnetic reconnection in regimes directly relevant to space, solar, astrophysical, and fusion plasmas. The existing small-scale experiments have been focusing on the single X-line reconnection process either with small effective sizes or at low Lundquist numbers, but both of which are typically very large in natural and fusion plasmas. The design of the FLARE device is motivated to provide experimental access to the new regimes involving multiple X-lines, as guided by a reconnection ``phase diagram'' [Ji & Daughton, PoP (2011)]. Most of major components of the FLARE device have been designed and are under construction. The device will be assembled and installed in 2016, followed by commissioning and operation in 2017. The planned research on FLARE as a user facility will be discussed. Supported by NSF.

  4. How to estimate green house gas (GHG) emissions from an excavator by using CAT's performance chart

    NASA Astrophysics Data System (ADS)

    Hajji, Apif M.; Lewis, Michael P.

    2017-09-01

    Construction equipment activities are a major part of many infrastructure projects. This type of equipment typically releases large quantities of green house gas (GHG) emissions. GHG emissions may come from fuel consumption. Furthermore, equipment productivity affects the fuel consumption. Thus, an estimating tool based on the construction equipment productivity rate is able to accurately assess the GHG emissions resulted from the equipment activities. This paper proposes a methodology to estimate the environmental impact for a common construction activity. This paper delivers sensitivity analysis and a case study for an excavator based on trench excavation activity. The methodology delivered in this study can be applied to a stand-alone model, or a module that is integrated with other emissions estimators. The GHG emissions are highly correlated to diesel fuel use, which is approximately 10.15 kilograms (kg) of CO2 per gallon of diesel fuel. The results showed that the productivity rate model as the result from multiple regression analysis can be used as the basis for estimating GHG emissions, and also as the framework for developing emissions footprint and understanding the environmental impact from construction equipment activities introduction.

  5. Effective Safety Management in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Effective safety management is one of the serious problems in the construction industry worldwide, especially in large-scale construction projects. There have been significant reductions in the number and the rate of injury over the last 20 years. Nevertheless, construction remains as one of the high risk industry. The purpose of this study is to examine safety management in the Malaysian construction industry, as well as to highlight the importance of construction safety management. The industry has contributed significantly to the economic growth of the country. However, when construction safety management is not implemented systematically, accidents will happen and this can affect the economic growth of the country. This study put the safety management in construction project as one of the important elements to project performance and success. The study emphasize on awareness and the factors that lead to the safety cases in construction project.

  6. Research on cost control and management in high voltage transmission line construction

    NASA Astrophysics Data System (ADS)

    Xu, Xiaobin

    2017-05-01

    Enterprises. The cost control is of vital importance to the construction enterprises. It is the key to the profitability of the transmission line project, which is related to the survival and development of the electric power construction enterprises. Due to the long construction line, complex and changeable construction terrain as well as large construction costs of transmission line, it is difficult for us to take accurate and effective cost control on the project implementation of entire transmission line. Therefore, the cost control of transmission line project is a complicated and arduous task. It is of great theoretical and practical significance to study the cost control scheme of transmission line project by a more scientific and efficient way. Based on the characteristics of the construction project of the transmission line project, this paper analyzes the construction cost structure of the transmission line project and the current cost control problem of the transmission line project, and demonstrates the necessity and feasibility of studying the cost control scheme of the transmission line project more accurately. In this way, the dynamic cycle cost control process including plan, implementation, feedback, correction, modification and re-implement is achieved to realize the accurate and effective cost control of entire electric power transmission line project.

  7. Research on the application of BIM technology in the whole life cycle of construction projects

    NASA Astrophysics Data System (ADS)

    Chang-liu, CHEN; Wei-wei, KOU; Shuai-hua, YE

    2018-05-01

    BIM technology can realize information sharing, and good BIM application will reduce the whole life cycle cost of construction projects. The popularization of BIM technology challenges the application of BIM technology at all stages of the whole life cycle of the construction project. It will give full play to the value of BIM, if developing a reasonable BIM project execution plan, defining BIM requirements, specifying Level of Development, determining the BIM quality control plan and clearing BIM application content of each stage, and will provide a unified method for project stakeholders, realize the whole life cycle of construction projects, and achieve the desired information sharing in construction project.

  8. 25 CFR 700.465 - Technical feasibility.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...

  9. 25 CFR 700.465 - Technical feasibility.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...

  10. 25 CFR 700.465 - Technical feasibility.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...

  11. 25 CFR 700.465 - Technical feasibility.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...

  12. 25 CFR 700.465 - Technical feasibility.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... construction, technology, or another engineering project, however, an application for a construction, technology or another engineering project shall: (a) Include sufficient information to determine the nature... construction, technology, or other engineering project prior to construction. The Commission shall review the...

  13. 42 CFR 137.329 - What environmental considerations must be included in the construction project agreement?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... must be included in the construction project agreement? The construction project agreement must include..., and (d) An assurance that no action will be taken on the construction phase of the project that would... 42 Public Health 1 2010-10-01 2010-10-01 false What environmental considerations must be included...

  14. Research on Green Construction Technology Applied at Guangzhou Hongding Building Project

    NASA Astrophysics Data System (ADS)

    Lou, Yong Zhong

    2018-06-01

    The green construction technology is the embodiment of sustainable development strategy in the construction industry, and it is a new construction mode which requires a higher environmental protection. Based on the Hongding building project, this paper describes the application and innovation of technical in the process of implementing green construction in the project, as well as the difficulties and characteristics in the specific practice; .The economic and social benefits of green construction are compared to the traditional construction model; .The achievements and experience of the green construction technology are summarized in the project; The ideas and methods in the process of implementing green construction are abstracted; some suggestions are put forward for the development of green construction.

  15. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  16. The communication in industrialised building system (IBS) construction project: Virtual environment

    NASA Astrophysics Data System (ADS)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd

    2017-10-01

    Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.

  17. Highway construction related business impacts : phase 3 effort for the town of Dubois.

    DOT National Transportation Integrated Search

    2008-03-01

    Highway construction projects not only impact the traveling public, but can also impact businesses situated adjacent to the construction project. Even : though construction projects are temporary situations, many businesses worry about the level of i...

  18. Relationship between time management in construction industry and project management performance

    NASA Astrophysics Data System (ADS)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  19. Documentation: No Substitute for Communication

    NASA Technical Reports Server (NTRS)

    Strickland, John

    2005-01-01

    SO WHAT IS AN RFI? IT WAS ONE OF THE FIRST THINGS I learned about back when I started my project management career with my first large construction firm. I learned how to use these forms as a convenient and effective means of documenting the many legitimate clarifications needed on a major project. However, like most other young engineers, I also learned to use the RFI as a weapon in the ongoing battle between owners. or their designer and the construction contractors. Recently, our project team has done a few simple things to greatly reduce the waste and frustration that comes from this type of battle. The RFI form can be a great tool if used properly, and I certainly don t recommend that they be eliminated entirely. The RFI form was created to document the many clarifications that are commonly required on projects. Typically, the contractor uses the top half of the form to clarify-or request permission to vary from-the contract documents. The bottom half of the form is used to record the answer. But this seemingly simple process is plagued by a number of problems. From the contractor s perspective, RFIs are needed to secure information that should have been in the contract documents in the first place. The missing information keeps their crews from working effectively, and it makes hitting already demanding cost and schedule targets even more difficult. Owners, or their design firms, often view the RFI as a means of harassment. Both sides of the issue have legitimate complaints, and both sides cause most of their own pain.

  20. Boom Time.

    ERIC Educational Resources Information Center

    Agron, Joe

    1998-01-01

    Examines building-cost trend data for educational facilities from the American School & University's 24th annual Official Education Construction Report for 1997. Data tables list education construction by projects completed; by projected spending; institution type; type of spending; projects projected for completion; and how construction costs…

  1. Generating effective project scheduling heuristics by abstraction and reconstitution

    NASA Technical Reports Server (NTRS)

    Janakiraman, Bhaskar; Prieditis, Armand

    1992-01-01

    A project scheduling problem consists of a finite set of jobs, each with fixed integer duration, requiring one or more resources such as personnel or equipment, and each subject to a set of precedence relations, which specify allowable job orderings, and a set of mutual exclusion relations, which specify jobs that cannot overlap. No job can be interrupted once started. The objective is to minimize project duration. This objective arises in nearly every large construction project--from software to hardware to buildings. Because such project scheduling problems are NP-hard, they are typically solved by branch-and-bound algorithms. In these algorithms, lower-bound duration estimates (admissible heuristics) are used to improve efficiency. One way to obtain an admissible heuristic is to remove (abstract) all resources and mutual exclusion constraints and then obtain the minimal project duration for the abstracted problem; this minimal duration is the admissible heuristic. Although such abstracted problems can be solved efficiently, they yield inaccurate admissible heuristics precisely because those constraints that are central to solving the original problem are abstracted. This paper describes a method to reconstitute the abstracted constraints back into the solution to the abstracted problem while maintaining efficiency, thereby generating better admissible heuristics. Our results suggest that reconstitution can make good admissible heuristics even better.

  2. 78 FR 21617 - Notice of Proposed Information Collection: Comment Request; Multifamily Project Construction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-11

    ... Information Collection: Comment Request; Multifamily Project Construction Contract, Building Loan Agreement, and Construction Change Request AGENCY: Office of the Assistant Secretary for Housing, HUD. ACTION.... This Notice also lists the following information: Title of Proposal: Multifamily Project Construction...

  3. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 11 2011-01-01 2011-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  4. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 11 2010-01-01 2010-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  5. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 11 2013-01-01 2013-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  6. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 11 2014-01-01 2014-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  7. 7 CFR 1726.403 - Project construction contract closeout.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 11 2012-01-01 2012-01-01 false Project construction contract closeout. 1726.403... SERVICE, DEPARTMENT OF AGRICULTURE ELECTRIC SYSTEM CONSTRUCTION POLICIES AND PROCEDURES Contract Closeout § 1726.403 Project construction contract closeout. This section is applicable to contracts executed on...

  8. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    NASA Astrophysics Data System (ADS)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  9. 25 CFR 1000.240 - What construction programs included in an AFA are subject to this subpart?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., coordination, responsibility for the construction project, day-to-day on-site management on site-management and administration of the project, which may include cost management, project budgeting, project scheduling and... Tribal, facilities and projects. (b) The following programs and activities are not construction programs...

  10. 13 CFR 308.1 - Use of funds in Projects constructed under projected cost.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 13 Business Credit and Assistance 1 2010-01-01 2010-01-01 false Use of funds in Projects constructed under projected cost. 308.1 Section 308.1 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PERFORMANCE INCENTIVES § 308.1 Use of funds in Projects constructed under...

  11. Application of BIM technology in construction bidding

    NASA Astrophysics Data System (ADS)

    wei, Li

    2017-12-01

    bidding is a very important step of construction project. For the owners, bidding is the key link of selecting the best construction plan and saving the project cost to the maximum extent. For Construction Corporation, it is the key to show their construction technology which can improve the probability of winning the bid. this paper researches on the application of BIM technology in bidding process of construction project in detail, and discussesthe application of BIM technology in construction field comprehensively.

  12. Simplification rules for birdtrack operators

    NASA Astrophysics Data System (ADS)

    Alcock-Zeilinger, J.; Weigert, H.

    2017-05-01

    This paper derives a set of easy-to-use tools designed to simplify calculations with birdtrack operators comprised of symmetrizers and antisymmetrizers. In particular, we present cancellation rules allowing one to shorten the birdtrack expressions of operators and propagation rules identifying the circumstances under which it is possible to propagate symmetrizers past antisymmetrizers and vice versa. We exhibit the power of these simplification rules by means of a short example in which we apply the tools derived in this paper on a typical operator that can be encountered in the representation theory of 𝖲𝖴 (N ) over the product space V⊗m. These rules form the basis for the construction of compact Hermitian Young projection operators and their transition operators addressed in companion papers [J. Alcock-Zeilinger and H. Weigert, "Compact Hermitian Young projection operators," e-print arXiv:1610.10088 [math-ph] and J. Alcock-Zeilinger and H. Weigert, "Transition operators," e-print arXiv:1610.08802 [math-ph

  13. Silicon materials task of the Low Cost Solar Array Project: Effect of impurities and processing on silicon solar cells

    NASA Technical Reports Server (NTRS)

    Hopkins, R. H.; Davis, J. R.; Rohatgi, A.; Hanes, M. H.; Rai-Choudhury, P.; Mollenkopf, H. C.

    1982-01-01

    The effects of impurities and processing on the characteristics of silicon and terrestrial silicon solar cells were defined in order to develop cost benefit relationships for the use of cheaper, less pure solar grades of silicon. The amount of concentrations of commonly encountered impurities that can be tolerated in typical p or n base solar cells was established, then a preliminary analytical model from which the cell performance could be projected depending on the kinds and amounts of contaminants in the silicon base material was developed. The impurity data base was expanded to include construction materials, and the impurity performace model was refined to account for additional effects such as base resistivity, grain boundary interactions, thermal processing, synergic behavior, and nonuniform impurity distributions. A preliminary assessment of long term (aging) behavior of impurities was also undertaken.

  14. The Application of the Real Options Method for the Evaluation of High-Rise Construction Projects

    NASA Astrophysics Data System (ADS)

    Izotov, Aleksandr; Rostova, Olga; Dubgorn, Alissa

    2018-03-01

    The paper is devoted to the problem of evaluation of high-rise construction projects in a rapidly changing environment. The authors proposed an algorithm for constructing and embedding real options in high-rise construction projects, which makes it possible to increase the flexibility of managing multi-stage projects that have the ability to adapt to changing conditions of implementation.

  15. UTIS as one example of standardization of subsea intervention systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haugen, F.G.

    1995-12-31

    The number of diverless subsea interventions has increased dramatically during the last few years. A number of types of tools and equipment have been designed and used. A typical procedure has been to develop new intervention tools under each new contract based on experience from the previous project. This is not at all optimal with regard to project cost and risk, and is no longer acceptable as the oil industry now calls for cost savings within all areas of field development. One answer to the problem will be to develop universal intervention systems with the capability to perform a rangemore » of related tasks, with only minor, planned modifications of the system. This philosophy will dramatically reduce planning, engineering, construction and interface work related to the intervention operation as the main work will be only to locate a standardized landing facility on the subsea structure. The operating procedures can be taken ``off the shelf``. To adapt to this philosophy within the tie-in area, KOS decided to standardize on a Universal Tie-In System (UTIS), which will be included in a Tool Pool for rental world-wide. This paper describes UTIS as a typical example of standardization of subsea intervention systems. 16 figs., 1 tab.« less

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Butler, T.; Curtis, O.; Stephenson, R.

    As part of the NAHB Research Center Industry Partnership, Southface partnered with TaC Studios, an Atlanta-based architecture firm specializing in residential and light commercial design, on the construction of a new test home in Atlanta, GA, in the mixed humid climate. This home serves as a residence and home office for the firm's owners, as well as a demonstration of their design approach to potential and current clients. Southface believes the home demonstrates current best practices for the mixed-humid climate, including a building envelope featuring advanced air sealing details and low density spray foam insulation, glazing that exceeds ENERGY STARmore » requirements, and a high performance heating and cooling system. Construction quality and execution was a high priority for TaC Studios and was ensured by a third party review process. Post-construction testing showed that the project met stated goals for envelope performance, an air infiltration rate of 2.15 ACH50. The homeowners wished to further validate whole house energy savings through the project's involvement with Building America and this long-term monitoring effort. As a Building America test home, this home was evaluated to detail whole house energy use, end use loads, and the efficiency and operation of the ground source heat pump and associated systems. Given that the home includes many non-typical end use loads including a home office, pool, landscape water feature, and other luxury features not accounted for in Building America modeling tools, these end uses were separately monitored to determine their impact on overall energy consumption.« less

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Butler, T.; Curtis, O.; Stephenson, R.

    As part of the NAHB Research Center Industry Partnership, Southface partnered with TaC Studios, an Atlanta-based architecture firm specializing in residential and light commercial design, on the construction of a new test home in Atlanta, GA in the mixed humid climate. This home serves as a residence and home office for the firm's owners, as well as a demonstration of their design approach topotential and current clients. Southface believes the home demonstrates current best practices for the mixed-humid climate, including a building envelope featuring advanced air sealing details and low density spray foam insulation, glazing that exceeds ENERGY STAR requirements,more » and a high performance heating and cooling system. Construction quality and execution was a high priority for TaCStudios and was ensured by a third party review process. Post-construction testing showed that the project met stated goals for envelope performance, an air infiltration rate of 2.15 ACH50. The homeowners wished to further validate whole house energy savings through the project's involvement with Building America and this long-term monitoring effort. As a Building America test home, this homewas evaluated to detail whole house energy use, end use loads, and the efficiency and operation of the ground source heat pump and associated systems. Given that the home includes many non-typical end use loads including a home office, pool, landscape water feature, and other luxury features not accounted for in Building America modeling tools, these end uses were separately monitored todetermine their impact on overall energy consumption.« less

  18. Methodology of project management at implementation of projects of high-rise construction

    NASA Astrophysics Data System (ADS)

    Papelniuk, Oksana

    2018-03-01

    High-rise construction is the perspective direction in urban development. An opportunity to arrange on rather small land plot a huge number of the living and commercial space makes high-rise construction very attractive for developers. However investment projects of high-rise buildings' construction are very expensive and complex that sets a task of effective management of such projects for the company builder. The best tool in this area today is the methodology of project management, which becomes a key factor of efficiency.

  19. 24 CFR 941.402 - Project design and construction.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project design and construction... URBAN DEVELOPMENT PUBLIC HOUSING DEVELOPMENT Project Development § 941.402 Project design and.... A PHA may certify that its proposed design and construction plans for the development are in...

  20. 75 FR 45147 - Notice of Submission of Proposed Information Collection to OMB; Multifamily Project Construction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... Proposed Information Collection to OMB; Multifamily Project Construction Contract, Building Loan Agreement, & Construction Change; HUD Programs AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY.../borrowers, and mortgagees/lenders for construction of multifamily projects and to obtain approval of changes...

  1. Construction project management handbook.

    DOT National Transportation Integrated Search

    2012-03-01

    The purpose of the FTA Construction Project Management Handbook is to provide guidelines for use by public transit agencies (Agen-cies) undertaking substantial construction projects, either for the first time or with little prior experience with cons...

  2. Monitoring Environmental Performance Commitments in Construction Projects.

    DOT National Transportation Integrated Search

    2007-05-01

    EPCs are measures implemented during project construction to reduce environmental impacts. These commitments are directed toward the Projects performance period only and focus primarily on reducing the impacts of construction equipment and trucks....

  3. Risk Management in Complex Construction Projects that Apply Renewable Energy Sources: A Case Study of the Realization Phase of the Energis Educational and Research Intelligent Building

    NASA Astrophysics Data System (ADS)

    Krechowicz, Maria

    2017-10-01

    Nowadays, one of the characteristic features of construction industry is an increased complexity of a growing number of projects. Almost each construction project is unique, has its project-specific purpose, its own project structural complexity, owner’s expectations, ground conditions unique to a certain location, and its own dynamics. Failure costs and costs resulting from unforeseen problems in complex construction projects are very high. Project complexity drivers pose many vulnerabilities to a successful completion of a number of projects. This paper discusses the process of effective risk management in complex construction projects in which renewable energy sources were used, on the example of the realization phase of the ENERGIS teaching-laboratory building, from the point of view of DORBUD S.A., its general contractor. This paper suggests a new approach to risk management for complex construction projects in which renewable energy sources were applied. The risk management process was divided into six stages: gathering information, identification of the top, critical project risks resulting from the project complexity, construction of the fault tree for each top, critical risks, logical analysis of the fault tree, quantitative risk assessment applying fuzzy logic and development of risk response strategy. A new methodology for the qualitative and quantitative risk assessment for top, critical risks in complex construction projects was developed. Risk assessment was carried out applying Fuzzy Fault Tree analysis on the example of one top critical risk. Application of the Fuzzy sets theory to the proposed model allowed to decrease uncertainty and eliminate problems with gaining the crisp values of the basic events probability, common during expert risk assessment with the objective to give the exact risk score of each unwanted event probability.

  4. 41 CFR 102-74.135 - Who selects construction and alteration projects that are to be performed?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... and alteration projects that are to be performed? 102-74.135 Section 102-74.135 Public Contracts and... construction and alteration projects that are to be performed? The Administrator of General Services selects construction and alteration projects to be performed. ...

  5. Detail, juncture bay of 1917 and 1942 construction, showing construction ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail, juncture bay of 1917 and 1942 construction, showing construction bay and typical windows, center of south elevation. - Watertown Arsenal, Building No. 311, Arsenal Street, Watertown, Middlesex County, MA

  6. Locally-Adaptive, Spatially-Explicit Projection of U.S. Population for 2030 and 2050

    DOE PAGES

    McKee, Jacob J.; Rose, Amy N.; Bright, Eddie A.; ...

    2015-02-03

    Localized adverse events, including natural hazards, epidemiological events, and human conflict, underscore the criticality of quantifying and mapping current population. Moreover, knowing the spatial distribution of future population allows for increased preparation in the event of an emergency. Building on the spatial interpolation technique previously developed for high resolution population distribution data (LandScan Global and LandScan USA), we have constructed an empirically-informed spatial distribution of the projected population of the contiguous U.S. for 2030 and 2050. Whereas most current large-scale, spatially explicit population projections typically rely on a population gravity model to determine areas of future growth, our projection modelmore » departs from these by accounting for multiple components that affect population distribution. Modelled variables, which included land cover, slope, distances to larger cities, and a moving average of current population, were locally adaptive and geographically varying. The resulting weighted surface was used to determine which areas had the greatest likelihood for future population change. Population projections of county level numbers were developed using a modified version of the U.S. Census s projection methodology with the U.S. Census s official projection as the benchmark. Applications of our model include, but are not limited to, suitability modelling, service area planning for governmental agencies, consequence assessment, mitigation planning and implementation, and assessment of spatially vulnerable populations.« less

  7. Locally-Adaptive, Spatially-Explicit Projection of U.S. Population for 2030 and 2050

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McKee, Jacob J.; Rose, Amy N.; Bright, Eddie A.

    Localized adverse events, including natural hazards, epidemiological events, and human conflict, underscore the criticality of quantifying and mapping current population. Moreover, knowing the spatial distribution of future population allows for increased preparation in the event of an emergency. Building on the spatial interpolation technique previously developed for high resolution population distribution data (LandScan Global and LandScan USA), we have constructed an empirically-informed spatial distribution of the projected population of the contiguous U.S. for 2030 and 2050. Whereas most current large-scale, spatially explicit population projections typically rely on a population gravity model to determine areas of future growth, our projection modelmore » departs from these by accounting for multiple components that affect population distribution. Modelled variables, which included land cover, slope, distances to larger cities, and a moving average of current population, were locally adaptive and geographically varying. The resulting weighted surface was used to determine which areas had the greatest likelihood for future population change. Population projections of county level numbers were developed using a modified version of the U.S. Census s projection methodology with the U.S. Census s official projection as the benchmark. Applications of our model include, but are not limited to, suitability modelling, service area planning for governmental agencies, consequence assessment, mitigation planning and implementation, and assessment of spatially vulnerable populations.« less

  8. 3D Seismic Imaging over a Potential Collapse Structure

    NASA Astrophysics Data System (ADS)

    Gritto, Roland; O'Connell, Daniel; Elobaid Elnaiem, Ali; Mohamed, Fathelrahman; Sadooni, Fadhil

    2016-04-01

    The Middle-East has seen a recent boom in construction including the planning and development of complete new sub-sections of metropolitan areas. Before planning and construction can commence, however, the development areas need to be investigated to determine their suitability for the planned project. Subsurface parameters such as the type of material (soil/rock), thickness of top soil or rock layers, depth and elastic parameters of basement, for example, comprise important information needed before a decision concerning the suitability of the site for construction can be made. A similar problem arises in environmental impact studies, when subsurface parameters are needed to assess the geological heterogeneity of the subsurface. Environmental impact studies are typically required for each construction project, particularly for the scale of the aforementioned building boom in the Middle East. The current study was conducted in Qatar at the location of a future highway interchange to evaluate a suite of 3D seismic techniques in their effectiveness to interrogate the subsurface for the presence of karst-like collapse structures. The survey comprised an area of approximately 10,000 m2 and consisted of 550 source- and 192 receiver locations. The seismic source was an accelerated weight drop while the geophones consisted of 3-component 10 Hz velocity sensors. At present, we analyzed over 100,000 P-wave phase arrivals and performed high-resolution 3-D tomographic imaging of the shallow subsurface. Furthermore, dispersion analysis of recorded surface waves will be performed to obtain S-wave velocity profiles of the subsurface. Both results, in conjunction with density estimates, will be utilized to determine the elastic moduli of the subsurface rock layers.

  9. Construction project management handbook : September 2009.

    DOT National Transportation Integrated Search

    2009-09-01

    The purpose of this Handbook is to provide guidelines for use by public transit agencies (Agencies) undertaking substantial construction : projects, either for the first time or with little prior experience with construction project management. It pr...

  10. Construction Know-How: Making the Best Possible Decisions Regarding School Construction and Renovation Projects.

    ERIC Educational Resources Information Center

    Argon, Joe, Ed.; Spoor, Dana L.; Cox, Susan M.; Brown, Andrew; Ray, Jennifer

    1998-01-01

    Presents a series of articles that examine decision making in school construction and renovation projects. Topics include preparing for a construction project, purchasing windows that provide protection at a reasonable cost, choosing the best flooring and carpeting, and dealing with deregulation. An industry roundtable discussion on project…

  11. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  12. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  13. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  14. 14 CFR 151.47 - Performance of construction work: Letting of contracts.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Performance of construction work: Letting... Development Projects § 151.47 Performance of construction work: Letting of contracts. (a) Advertising required... project, each contract for construction work on a project in the amount of more than $2,000 must be...

  15. Electronic construction collaboration system -- final phase : [tech transfer summary].

    DOT National Transportation Integrated Search

    2014-07-01

    Construction projects have been growing more complex in terms of : project team composition, design aspects, and construction processes. : To help manage the shop/working drawings and requests for information : (RFIs) for its large, complex projects,...

  16. Enhancements to highway construction scheduling expert system.

    DOT National Transportation Integrated Search

    2015-05-01

    This research was performed to enhance the software tool (Illinois Construction Scheduling Expert : System, ICSES) developed in Phase I of this project (ICT project R27-86) by mining data collected on : IDOT construction projects and differentiating ...

  17. Project coalitions in healthcare construction projects and the application of real options: an exploratory survey.

    PubMed

    van Reedt Dortland, Maartje; Dewulf, Geert; Voordijk, Hans

    2013-01-01

    Exploring the impact of the type of project coalition on types of flexibility by analyzing considered and exercised flexibilities in separated and integrated project coalitions in the design and construction phase and the operations and maintenance phase of a healthcare construction project. Flexibility in healthcare construction projects is increasingly needed in order to deal with growing uncertainties. Until now, little research has been carried out on how and to what extent flexibility is incorporated in different types of project coalitions chosen by healthcare organizations. An exploratory survey was conducted among health organizations in both cure and care. Questions were asked on the position of the real estate department within the organization, the type of project coalitions chosen and the rationale behind this choice, and the extent to which flexibility in terms of a real option was considered and to what extent it had been exercised in a project coalition. Integrated project coalitions pay more attention to flexibility in advance in both the process and the product, but exercise them to a lesser extent than separated project coalitions. The economic feasibility of real options is higher in integrated project coalitions. The study shows that real options thinking is already incorporated in real estate management of healthcare organizations, although more flexibility is considered in advance of the project than is actually realized during and after construction. Built environment, construction, decision making, hospitals, planning.

  18. Research on Non-Destructive Testing Technology in Conservation Repair Project of Ancestral Temple in Mukden Palace

    NASA Astrophysics Data System (ADS)

    Yang, J.; Fu, M.

    2017-08-01

    Due to the use of wood and other non-permanent materials, traditional Chinese architecture is one of the most fragile constructions in various heritage objects today. With the increasing emphasis on the protection of cultural relics, the repair project of wooden structure has become more and more important. There are various kinds of destructions, which pose a hidden danger to the overall safety of the ancient buildings, caused not only by time and nature, but also by improper repairs in history or nowadays. Today, the use of digital technology is a basic requirement in the conservation of cultural heritage. Detection technology, especially non-destructive testing technology, could provide more accurate records in capturing detailed physical characteristics of structures such as geometric deformation and invisible damage, as well as prevent a man-made destruction in the process of repair project. This paper aims to interpret with a typical example, Ancestral Temple in Mukden Palace, along with a discussion of how to use the non-destructive testing technology with ground penetrating radar, stress wave, resistograph and so on, in addition to find an appropriate protection method in repair project of traditional Chinese wooden architecture.

  19. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    NASA Astrophysics Data System (ADS)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of measures of the goals. It is crucial to identify the stakeholders, whereas it is a continuous and quite difficult process. However, when ignoring the impact of specific stakeholders on the implementation of the project, a duration of the project and its costs may increase. A main problem, in establishing a relationship of participants in the construction process, is to take into account the risk of all project stakeholders.

  20. DETAIL OF TYPICAL WALL CONSTRUCTION IN COOLING ROOMS; TWO LAYERS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL OF TYPICAL WALL CONSTRUCTION IN COOLING ROOMS; TWO LAYERS OF CORK INSULATION ARE ATTACHED TO REINFORCED CONCRETE WALL WITH WOOD SLEEPERS AND ASPHALT MASTIC; THIN, GLAZED TERRA-COTTA TILES PROTECT THE INSULATION INSIDE THE COOLER - Rath Packing Company, Hog Cutting Building, Sycamore Street between Elm & Eighteenth Streets, Waterloo, Black Hawk County, IA

  1. Leveraging Text Content for Management of Construction Project Documents

    ERIC Educational Resources Information Center

    Alqady, Mohammed

    2012-01-01

    The construction industry is a knowledge intensive industry. Thousands of documents are generated by construction projects. Documents, as information carriers, must be managed effectively to ensure successful project management. The fact that a single project can produce thousands of documents and that a lot of the documents are generated in a…

  2. Educational Programs for Graduate Level Learners and Professionals - National Radio Astronomy Observatory National and International Non-Traditional Exchange Program

    NASA Astrophysics Data System (ADS)

    Wingate, Lory Mitchell

    2017-01-01

    The National Radio Astronomy Observatory’s (NRAO) National and International Non-Traditional Exchange (NINE) Program teaches concepts of project management and systems engineering to chosen participants within a nine-week program held at NRAO in New Mexico. Participants are typically graduate level students or professionals. Participation in the NINE Program is through a competitive process. The program includes a hands-on service project designed to increase the participants knowledge of radio astronomy. The approach demonstrate clearly to the learner the positive net effects of following methodical approaches to achieving optimal science results.The NINE teaches participants important sustainable skills associated with constructing, operating and maintaining radio astronomy observatories. NINE Program learners are expected to return to their host sites and implement the program in their own location as a NINE Hub. This requires forming a committed relationship (through a formal Letter of Agreement), establishing a site location, and developing a program that takes into consideration the needs of the community they represent. The anticipated outcome of this program is worldwide partnerships with fast growing radio astronomy communities designed to facilitate the exchange of staff and the mentoring of under-represented groups of learners, thereby developing a strong pipeline of global talent to construct, operate and maintain radio astronomy observatories.

  3. Using mobile computers to automate the inspection process for highway construction projects.

    DOT National Transportation Integrated Search

    2013-12-01

    Highway construction projects are characterized by the large amount of data that needs to be collected, processed, and exchanged among the : different project participants. Collection of construction inspection data, in particular, allows field perso...

  4. Evaluation of recycled projects for performance : final report.

    DOT National Transportation Integrated Search

    1995-04-01

    Louisiana constructed two hot mix recycling projects in 1978 in order to determine the feasibility of this technology with respect to design and construction. In 1980-81 four recycled projects were constructed to examine the variations found in recyc...

  5. Bonded concrete overlay performance in Illinois

    DOT National Transportation Integrated Search

    2002-04-01

    Two bonded concrete overlay rehabilitation projects were constructed in Illinois during the 1990's. The first project was constructed in 1994 and 1995 on Interstate 80, east of Moline. The second project was constructed in 1996 on Interstate 88 near ...

  6. Experimental and numerical study of wastewater pollution in Yuhui channel, Jiashan city

    NASA Astrophysics Data System (ADS)

    Fu, Lei; Peng, Zhenhua; You, Aiju

    2018-02-01

    Due to the development of economics and society in China, the huge amount of wastewater becomes a serious problem in most of the Chinese cities. Therefore, the construction of wastewater treatment plant draws much more attentions than before. The discharge from the wastewater treatment plant is then considered as a point source in most of the important rivers and channels in China. In this study, a typical wastewater treatment plant extension project is introduced as a case study, a filed monitoring experiment is designed and executed to observe required data, then, a two-dimensional model is estabilished to simulate the water quality downsteam of the wastewater treatment plant, CODCr is considered as a typical pollutant during the simulation. The simulation results indicate that different discharge conditions will lead to different CODCr concentration downstream of the wastewater treatment plant, and an emergency plan should be prepared to minimize the risk of the pollution in the channel under unusual and accident conditions.

  7. Gas Ring-Imagining Cherenkov (GRINCH) Detector for the Super BigBite Spectrometer at Jefferson Lab

    NASA Astrophysics Data System (ADS)

    Averett, Todd; Wojtsekhowski, Bogdan; Amidouch, Abdellah; Danagoulian, Samuel; Niculescu, Gabriel; Niculescu, Ioana; Jefferson Lab SBS Collaboration Collaboration

    2017-01-01

    A new gas Cherenkov detector is under construction for the upcoming SuperBigBite spectrometer research program in Hall A at Jefferson Lab. The existing BigBite spectrometer is being upgraded to handle expected increases in event rate and background rate due to the increased luminosity required for the experimental program. The detector will primarily be used to separate good electron events from significant pion and electromagnetic contamination. In contrast to typical gas Cherenkov detectors that use large-diameter photomultiplier tubes and charge integrating ADCs, this detector uses an array of 510 small-diameter tubes that are more than 25x less sensitive to background. Cherenkov radiation clusters will be identified in this array using fast TDCs and a narrow timing window relative to typical ADC gates. In addition, a new FPGA-based DAQ system is being tested to provide a PID trigger using real-time cluster finding. Details of the detector and current status of the project will be presented.

  8. The use of debt.

    PubMed

    Hood, W L; Loughery, C V

    1990-05-01

    Stewards of Catholic healthcare organizations must proceed cautiously before embarking on new construction or renovation projects. Many important issues are involved in financing such projects, including business risk, financial philosophy, financial structure, and forms of debt. The proper foundation for any financing structure must begin with financial philosophy. Some healthcare facilities have traditionally used no external financing; others have employed significant levels of debt. To determine a proper level of debt for the project(s) being financed, it is important to look at business risk. If a modest decline in revenues (or a similar increase in costs) would threaten the project's viability, the business risk would be high; therefore prudence would dictate that the level of debt undertaken be relatively small. A separate analysis is required to determine the appropriate mix of floating-rate and fixed-rate long-term debt. As a rule of thumb, fixed-rate debt would typically form two thirds of the debt structure; floating-rate debt, no more than one third. For healthcare, debt can take two forms: tax exempt and taxable. Tax-exempt financing has many constraints, including use of proceeds by a tax-exempt entity, arbitrage rules, tax legislation, and financial disclosure laws. Taxable debt can be issued by private placement or on a publicly traded basis.

  9. Projected Heat Wave Characteristics over the Korean Peninsula During the Twenty-First Century

    NASA Astrophysics Data System (ADS)

    Shin, Jongsoo; Olson, Roman; An, Soon-Il

    2018-02-01

    Climate change is expected to increase temperatures globally, and consequently more frequent, longer, and hotter heat waves are likely to occur. Ambiguity in defining heat waves appropriately makes it difficult to compare changes in heat wave events over time. This study provides a quantitative definition of a heat wave and makes probabilistic heat wave projections for the Korean Peninsula under two global warming scenarios. Changes to heat waves under global warming are investigated using the representative concentration pathway 4.5 (RCP4.5) and 8.5 (RCP8.5) experiments from 30 coupled models participating in phase five of the Coupled Model Inter-comparison Project. Probabilistic climate projections from multi-model ensembles have been constructed using both simple and weighted averaging. Results from both methods are similar and show that heat waves will be more intense, frequent, and longer lasting. These trends are more apparent under the RCP8.5 scenario as compared to the RCP4.5 scenario. Under the RCP8.5 scenario, typical heat waves are projected to become stronger than any heat wave experienced in the recent measurement record. Furthermore, under this scenario, it cannot be ruled out that Korea will experience heat wave conditions spanning almost an entire summer before the end of the 21st century.

  10. BIM integration in education: A case study of the construction technology project Bolt Tower Dolni Vitkovice

    NASA Astrophysics Data System (ADS)

    Venkrbec, Vaclav; Bittnerova, Lucie

    2017-12-01

    Building information modeling (BIM) can support effectiveness during many activities in the AEC industry. even when processing a construction-technological project. This paper presents an approach how to use building information model in higher education, especially during the work on diploma thesis and it supervision. Diploma thesis is project based work, which aims to compile a construction-technological project for a selected construction. The paper describes the use of input data, working with them and compares this process with standard input data such as printed design documentation. The effectiveness of using the building information model as a input data for construction-technological project is described in the conclusion.

  11. Contractors perspective for critical factors of cost overrun in highway projects of Sindh, Pakistan

    NASA Astrophysics Data System (ADS)

    Sohu, Samiullah; Abdullah, Abd Halid; Nagapan, Sasitharan; Fattah, Abdul; Ullah, Kaleem; Kumar, Kanesh

    2017-10-01

    Construction industry of Pakistan is creating a number of opportunities in employment as well as plays a role model for economy development of the country. This construction industry has a serious issue of cost overrun in all construction projects especially in construction of highway projects. Cost overrun is a serious and critical issue in construction of highway projects which gives negative impact to construction practitioners because it is not only cross the approved budget but also approved time of the project. The main objective of this study is to find out critical factors causing cost overrun in highway projects of Sindh according to contractors' perspectives. Deep literature review was carried out and a total of 64 factors of cost overrun were identified. To achieve the objective, a questionnaire was designed and distributed among 16 selected respondents who have more than 20 years of experience in construction of highway projects. The results from analysis found that most critical factors of cost overrun in the order of importance include financial and cash flow difficulties faced by contractor, frequent changes in design, changes in price of materials, poor planning by client, change in scope of project, change in specification of materials and delay in taking decisions. This study will assist contractors to narrow down some of the critical factors that would lead to cost overrun, and therefore be prepared with the ways to mitigate these problems in construction of highway projects of Sindh province.

  12. But I'm an engineer—not a contracts lawyer!

    NASA Astrophysics Data System (ADS)

    Warner, Mark; Bass, Harvey

    2012-09-01

    Industrial partners, commercial vendors, and subsystem contractors play a large role in the design and construction of modern telescopes. Because many telescope projects carry relatively small staffs, engineers are often required to perform the additional functions of technical writing, cost estimating, and contract bidding and negotiating. The skills required to carry out these tasks are not normally taught in traditional engineering programs. As a result, engineers often learn to write Request for Proposals (RFPs), select vendors, and negotiate contracts by trial-and-error and/or by adapting previous project documents to match their own requirements. Typically, this means that at the end of a contract the engineer has a large list of do's, don'ts, and lessons learned for the next RFP he or she must generate. This paper will present one such engineer's experience writing and bidding proposal packages for large telescope components and subsystems. Included are: thoughts on structuring SOWs, Specs, ICDs, and other RFP documents; modern methods for bidding the work; and systematic means for selecting and negotiating with a contractor to arrive at the best value for the project.

  13. The antecedents of identification: a rhetorical analysis of British Muslim activists' constructions of community and identity.

    PubMed

    Hopkins, Nick; Kahani-Hopkins, Vered

    2004-03-01

    This paper takes as its focus the perception of community. This is analysed through reference to the literature concerning the adoption of more inclusive, superordinate social categories. Whilst most research tends to focus on the consequences of these social categories for self and other perception, we focus on their antecedents. These are typically hypothesized to include such issues as the perception of the subordinate groups' common fate and factors affecting their perceptual differentiation (e.g. their similarity and entitativity). However, rather than conceiving of such issues as pre-given antecedent variables, we explore how these issues (and others) are actively constructed in and through discourse. More specifically, we explore how such issues are sites of contestation as activists with different political projects seek to construct quite different versions of the relevant superordinate community identity. Our data are qualitative and are drawn from contemporary debates amongst British Muslims concerning their relations with non-Muslim Britons and non-British Muslims across the globe. A key issue in these deliberations concerns the nature of British Muslims' identity and the superordinate identifications that best facilitate its expression and realization. We suggest that constructions of common fate, similarity, entitativity etc., far from being 'givens', are the means through which different definitions of Muslim identity are constructed and different forms of collective action mobilized.

  14. Efficient Project Delivery Using Lean Principles - An Indian Case Study

    NASA Astrophysics Data System (ADS)

    Kovvuri, P. Ramachandra Reddy; Sawhney, Anil; Ahuja, Ritu; Sreekumar, Aiswarya

    2016-03-01

    Construction industry in India is growing at a rapid pace. Along with this growth, the industry is facing numerous challenges that are making delivery of projects inefficient. Experts believe that capacity constraints in the industry need to be addressed immediately. Government has recommended `introduction of efficient technologies and modern management techniques' to increase the productivity of the industry. In this context, lean principles can act as a lever to make project delivery more efficient and provide the much needed impetus to the Indian construction sector. Around the globe lean principles are showing positive results on the projects. Project teams are reporting improvements in construction time, cost and quality along with softer benefits of enhanced collaboration, coordination and trust in project teams. Can adoption of lean principles provide similar benefits in the Indian construction sector? This research was conducted to answer this question. Using an action research approach a key lean construction tool called Last Planner System (LPS) was tested on a large Indian construction project. The work described in this work investigates the improvements achieved in project delivery by adopting LPS in Indian construction sector. Comparison in pre- and post-implementation data demonstrates increase in the certainty of work-flow and improves schedule compliance. This is measured through a simple LPS metric called percent plan complete. Explicit improvements in schedule performance are seen during 8 week LPS implementation along with implicit improvements in coordination, collaboration and trust in the project team. This work reports the findings of LPS implementation on the case study project outlining the barriers and drivers to adoption, strategies needed to ensure successful implementation and roadmap for implementation. Based on the findings the authors envision that lean construction can make project delivery more efficient in India.

  15. Infection control in design and construction work.

    PubMed

    Collinge, William H

    2015-01-01

    To clarify how infection control requirements are represented, communicated, and understood in work interactions through the medical facility construction project life cycle. To assist project participants with effective infection control management by highlighting the nature of such requirements and presenting recommendations to aid practice. A 4-year study regarding client requirement representation and use on National Health Service construction projects in the United Kingdom provided empirical evidence of infection control requirement communication and understanding through design and construction work interactions. An analysis of construction project resources (e.g., infection control regulations and room data sheets) was combined with semi-structured interviews with hospital client employees and design and construction professionals to provide valuable insights into the management of infection control issues. Infection control requirements are representationally indistinct but also omnipresent through all phases of the construction project life cycle: Failure to recognize their nature, relevance, and significance can result in delays, stoppages, and redesign work. Construction project resources (e.g., regulatory guidance and room data sheets) can mask or obscure the meaning of infection control issues. A preemptive identification of issues combined with knowledge sharing activities among project stakeholders can enable infection control requirements to be properly understood and addressed. Such initiatives should also reference existing infection control regulatory guidance and advice. © The Author(s) 2015.

  16. Risk assessment framework on time impact: Infrastructure projects in soft soil during construction stage

    NASA Astrophysics Data System (ADS)

    Low, W. W.; Wong, K. S.; Lee, J. L.

    2018-04-01

    With the growth of economy and population, there is an increase in infrastructure construction projects. As such, it is unavoidable to have construction projects on soft soil. Without proper risk management plan, construction projects are vulnerable to different types of risks which will have negative impact on project’s time, cost and quality. Literature review showed that little or none of the research is focused on the risk assessment on the infrastructure project in soft soil. Hence, the aim of this research is to propose a risk assessment framework in infrastructure projects in soft soil during the construction stage. This research was focused on the impact of risks on project time and internal risk factors. The research method was Analytical Hierarchy Process and the sample population was experienced industry experts who have experience in infrastructure projects. Analysis was completed and result showed that for internal factors, the five most significant risks on time element are lack of special equipment, potential contractual disputes and claims, shortage of skilled workers, delay/lack of materials supply, and insolvency of contractor/sub-contractor. Results indicated that resources risk factor play a critical role on project time frame in infrastructure projects in soft soil during the construction stage.

  17. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  18. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  19. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  20. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  1. 49 CFR 268.21 - Down-selection of one or more Maglev projects for further study and selection of one project for...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... further study and selection of one project for final design, engineering, and construction funding. 268.21... and selection of one project for final design, engineering, and construction funding. (a) Upon... analyses necessary prior to initiation of construction. Final design and engineering work will also be...

  2. Risks Associated with Federal Construction Projects

    DTIC Science & Technology

    2011-06-01

    awarding contracts for construction projects (USACE, 2010). BIM offers a method to effectively design a facility while maximizing work performance during...includes Requirements, Programming, Funding, Solicitation, AEC Evaluation, Award , Project Validation, Design and Construction, and Project Management...includes the Solicitation, AEC Evaluation, and Award Steps. In this Phase, BIM is only used in the Solicitation and the AEC Evaluation steps

  3. Methodology for construction compliance monitoring in the crediting of investment projects for road construction

    NASA Astrophysics Data System (ADS)

    Vaynshtok, Natalia

    2017-10-01

    The article provides the results of development of the methodology for construction compliance monitoring in the crediting of investment projects for road construction. Work scope analysis of construction audit was conducted and an algorithm of financial audit in the crediting investment projects was developed. Furthermore, the possible pitfalls and abuses of counterparties were investigated and recommendations were given allowing the bank to receive objective and independent information on the progress of the project in real time. This mechanism is useful for the bank in insurance of possible risks, targeted and rational use of credit funds.

  4. Phase and widening construction of steel bridges.

    DOT National Transportation Integrated Search

    2014-03-01

    Phase construction is used to maintain traffic without interruption and generally refers to sequenced construction where a portion of the bridge is under construction while the remainder continues to carry traffic. The method typically results in two...

  5. 78 FR 52005 - 30-Day Notice of Proposed Information Collection: Multifamily Project Construction Contract...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-21

    ... Construction Contract, Building Loan Agreement, & Construction Change Request AGENCY: Office of the Chief... Information Collection Title of Information Collection: Multifamily Project Construction Contract, Building Loan Agreement, & Construction Change Request. OMB Approval Number: 2502-0011. Type of Request...

  6. 42 CFR 124.3 - Eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and... authority, or public or quasi-public corporation for a project described in paragraph (b) of this section.... (b) Eligible project. A grant under section 1625 may be made only for a construction and/or...

  7. Using Automated Essay Scores as an Anchor When Equating Constructed Response Writing Tests

    ERIC Educational Resources Information Center

    Almond, Russell G.

    2014-01-01

    Assessments consisting of only a few extended constructed response items (essays) are not typically equated using anchor test designs as there are typically too few essay prompts in each form to allow for meaningful equating. This article explores the idea that output from an automated scoring program designed to measure writing fluency (a common…

  8. Study of Collaborative Management for Transportation Construction Project Based on BIM Technology

    NASA Astrophysics Data System (ADS)

    Jianhua, Liu; Genchuan, Luo; Daiquan, Liu; Wenlei, Li; Bowen, Feng

    2018-03-01

    Abstract. Building Information Modeling(BIM) is a building modeling technology based on the relevant information data of the construction project. It is an advanced technology and management concept, which is widely used in the whole life cycle process of planning, design, construction and operation. Based on BIM technology, transportation construction project collaborative management can have better communication through authenticity simulation and architectural visualization and can obtain the basic and real-time information such as project schedule, engineering quality, cost and environmental impact etc. The main services of highway construction management are integrated on the unified BIM platform for collaborative management to realize information intercommunication and exchange, to change the isolated situation of information in the past, and improve the level of information management. The final BIM model is integrated not only for the information management of project and the integration of preliminary documents and design drawings, but also for the automatic generation of completion data and final accounts, which covers the whole life cycle of traffic construction projects and lays a good foundation for smart highway construction.

  9. Effective factor of virtual team: Resolving communication breakdown in IBS construction project

    NASA Astrophysics Data System (ADS)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd. Nasrun Mohd.

    2016-08-01

    Currently, rapid development of information technology has provided new opportunities to organisation toward increasing the effectiveness of collaboration and teamwork management. Thus the virtual team approach has been implemented in numerous of field. However, there is limited study of virtual team in construction project management. Currently IBS project is still based on traditional construction process which is isolation team working environment. Therefore this approach has been declared as a main barrier to ensure cooperative working relation in term of communication and information in between project stakeholders. Thus, this paper through literature review is attempted to present a discussion of the virtual team approach toward IBS project in developing effective team communication during construction project.

  10. Building America Case Study: Evaluating Through-Wall Air Transfer Fans, Pittsburgh, Pennsylvania (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2014-10-01

    In this project, Building America team IBACOS performed field testing in a new construction unoccupied test house in Pittsburgh, Pennsylvania to evaluate heating, ventilating, and air conditioning (HVAC) distribution systems during heating, cooling, and midseason conditions. Four air-based HVAC distribution systems were assessed:-a typical airflow ducted system to the bedrooms, a low airflow ducted system to the bedrooms, a system with transfer fans to the bedrooms, and a system with no ductwork to the bedrooms. The relative ability of each system was considered with respect to relevant Air Conditioning Contractors of America and ASHRAE standards for house temperature uniformity andmore » stability, respectively.« less

  11. A revolutionary approach to composite construction and flight management systems for small, general aviation airplanes

    NASA Technical Reports Server (NTRS)

    Roskam, Jan; Wenninger, ED

    1992-01-01

    The design studies for two composite general aviation airplanes are presented. The main consideration for both of the designs was to avoid the typical 'metal replacement' philosophy that has hindered the widespread use of composites in general aviation aircraft. The first design is for a low wing aircraft based on the Smith Aircraft Corporation GT-3 Global Trainer. The second aircraft is a composite version of the Cessna 152. The project was conducted as a graduate level design class under the auspices of the KU/NASA/USRA Advanced Design Program in aeronautics. The results obtained from the Fall semester of 1991 and the Spring semester of 1992 are presented.

  12. Moire technique utilization for detection and measurement of scoliosis

    NASA Astrophysics Data System (ADS)

    Zawieska, Dorota; Podlasiak, Piotr

    1993-02-01

    Moire projection method enables non-contact measurement of the shape or deformation of different surfaces and constructions by fringe pattern analysis. The fringe map acquisition of the whole surface of the object under test is one of the main advantages compared with 'point by point' methods. The computer analyzes the shape of the whole surface and next user can selected different points or cross section of the object map. In this paper a few typical examples of an application of the moire technique in solving different medical problems will be presented. We will also present to you the equipment the moire pattern analysis is done in real time using the phase stepping method with CCD camera.

  13. Representing Medical Knowledge in a Terminological Language is Difficult1

    PubMed Central

    Haimowits, Ira J.; Patil, Ramesh S.; Szolovits, Peter

    1988-01-01

    We report on an experiment to use a modern knowledge representation language, NIKL, to express the knowledge of a sophisticated medical reasoning program, ABEL. We are attempting to put the development of more capable medical programs on firmer representational grounds by moving from the ad hoc representations typical of current programs toward more principled representation languages now in use or under construction. Our experience with the project reported here suggests caution, however. Attempts at cleanliness and efficiency in the design of representation languages lead to a poverty of expressiveness that makes it difficult if not impossible to say in such languages what needs to be stated to support the application.

  14. 33 CFR 203.15 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...

  15. 33 CFR 203.15 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...

  16. 33 CFR 203.15 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...

  17. 33 CFR 203.15 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...

  18. Construction Management--Exploding Some Myths.

    ERIC Educational Resources Information Center

    Kluenker, Charles

    1986-01-01

    Construction management on educational facility projects provides boards of education with documentation showing the project is on track. Eight "myths" surrounding construction management are explained. (MLF)

  19. 23 CFR 140.607 - Construction.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...

  20. 23 CFR 140.607 - Construction.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...

  1. 23 CFR 140.607 - Construction.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...

  2. 23 CFR 140.607 - Construction.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...

  3. 23 CFR 140.607 - Construction.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Construction. 140.607 Section 140.607 Highways FEDERAL... Bond Issue Projects § 140.607 Construction. Construction shall be supervised by the SHA in the same manner as for regularly financed Federal-aid projects. The FHWA will make construction inspections and...

  4. Principles for the formation of an effective concept of multifunctional high-rise construction investment projects

    NASA Astrophysics Data System (ADS)

    Beliakov, Sergei

    2018-03-01

    Investment projects of high-rise construction have a number of features that determine specific risks and additional opportunities that require analysis and accounting in the formation of an effective project concept. The most significant features of high-rise construction include long construction time, complexity of technical and technological solutions, complexity of decisions on the organization of construction and operation, high cost of construction and operation, complexity in determining the ratio of areas designed to accommodate different functional areas, when organizing and coordinating the operation of the facility, with internal zoning. Taking into account the specificity of high-rise construction, among the factors determining the effectiveness of projects, it is advisable to consider as key factors: organizational, technological and investment factors. Within the framework of the article, the author singled out key particular functions for each group of factors under consideration, and also developed a system of principles for the formation of an effective concept of multifunctional high-rise construction investment projects, including the principle of logistic efficiency, the principle of optimal functional zoning, the principle of efficiency of equipment use, the principle of optimizing technological processes, the principle maximization of income, the principle of fund management, the principle of risk management . The model of formation of an effective concept of investment projects of multifunctional high-rise construction developed by the author can contribute to the development of methodological tools in the field of managing the implementation of high-rise construction projects, taking into account their specificity in the current economic conditions.

  5. Financial auditing at enterprises for control of projects realized with credit fund-raising

    NASA Astrophysics Data System (ADS)

    Lukmanova, Inessa

    2017-10-01

    The article analyzes methods of conducting financial audit under the construction control of projects implemented with raising credit funds in modern conditions. This work aims to improve the methodological toolkit of construction control when lending projects of the construction of transport infrastructure. The paper considers correlations of various procedures of construction control, financial audit and organizational and technical factors affecting investment and construction projects. The authors presented the logical scheme of the process of lending to legal entities and developed an algorithm of the procedure for conducting a financial audit, allowing to make possible adjustments and the right decision.

  6. 18 CFR 4.96 - Amendment of exemption.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... design, location, method of construction or operation of its project, it must first notify the..., location, method of construction or operation of the project, the exemption holder may implement the..., method of construction or the operation of the project works, the exemption holder may not implement the...

  7. MPIGeneNet: Parallel Calculation of Gene Co-Expression Networks on Multicore Clusters.

    PubMed

    Gonzalez-Dominguez, Jorge; Martin, Maria J

    2017-10-10

    In this work we present MPIGeneNet, a parallel tool that applies Pearson's correlation and Random Matrix Theory to construct gene co-expression networks. It is based on the state-of-the-art sequential tool RMTGeneNet, which provides networks with high robustness and sensitivity at the expenses of relatively long runtimes for large scale input datasets. MPIGeneNet returns the same results as RMTGeneNet but improves the memory management, reduces the I/O cost, and accelerates the two most computationally demanding steps of co-expression network construction by exploiting the compute capabilities of common multicore CPU clusters. Our performance evaluation on two different systems using three typical input datasets shows that MPIGeneNet is significantly faster than RMTGeneNet. As an example, our tool is up to 175.41 times faster on a cluster with eight nodes, each one containing two 12-core Intel Haswell processors. Source code of MPIGeneNet, as well as a reference manual, are available at https://sourceforge.net/projects/mpigenenet/.

  8. Is academic buoyancy anything more than adaptive coping?

    PubMed

    Putwain, David W; Connors, Liz; Symes, Wendy; Douglas-Osborn, Erica

    2012-05-01

    Academic buoyancy refers to a positive, constructive, and adaptive response to the types of challenges and setbacks experienced in a typical and everyday academic setting. In this project we examined whether academic buoyancy explained any additional variance in test anxiety over and above that explained by coping. Two hundred and ninety-eight students in their final two years of compulsory schooling completed self-report measures of academic buoyancy, coping, and test anxiety. Results suggested that buoyancy was inversely related to test anxiety and unrelated to coping. With the exception of test-irrelevant thoughts, test anxiety was positively related to avoidance coping and social support. Test-irrelevant thoughts were inversely related to task focus, unrelated to social support, and positively related to avoidance. A hierarchical regression analysis showed that academic buoyancy explained a significant additional proportion of variance in test anxiety when the variance for coping had already been accounted for. These findings suggest that academic buoyancy can be considered as a distinct construct from that of adaptive coping.

  9. Implementation of Building Information Modeling (BIM) in Construction: A Comparative Case Study

    NASA Astrophysics Data System (ADS)

    Rowlinson, Steve; Collins, Ronan; Tuuli, Martin M.; Jia, Yunyan

    2010-05-01

    Building Information Modeling (BIM) approach is increasingly adopted in coordination of construction projects, with a number of parties providing BIM services and software solutions. However, the empirical impact of BIM on construction industry has yet to be investigated. This paper explores the interaction between BIM and the construction industry during its implementation, with a specific focus on the empirical impacts of BIM on the design and construction processes and professional roles during the process. Two cases were selected from recent construction projects coordinated with BIM systems: the Venetian Casino project in Macau and the Cathy Pacific Cargo Terminal project in Hong Kong. The former case illustrates how the conflicts emerged during the design process and procurement were addressed by adopting a BIM approach. The latter demonstrates how the adoption of BIM altered the roles of architect, contractor, and sub-contractors involved in the project. The impacts of BIM were critically reviewed and discussed.

  10. UK and Italian EIA systems: A comparative study on management practice and performance in the construction industry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bassi, Andrea, E-mail: ab395@bath.co.uk; Howard, Robert, E-mail: robhoward@constcom.demon.co.uk; Geneletti, Davide, E-mail: davide.geneletti@ing.unitn.it

    This study evaluates and contrasts the management practice and the performance that characterise Environmental Impact Assessments (EIA) in Italy and in the UK. The methodology relies on the investigation of six carefully selected case studies, critically reviewed by referring to EIA and project design information, as well as collecting the opinion of key project participants. The study focuses on the construction industry and on specific key sectors like infrastructure for transport and renewable energy and commercial and tourism development. A main term of reference for the analyses has been established by critically reviewing international literature so as to outline commonmore » good practice, requirements for the enhancement of sustainability principles and typically incurred drawbacks. The proposed approach enhances transfer of knowledge and of experiences between the analyzed contexts and allows the provision of guidelines for practitioners. Distinctive differences between the UK and the Italian EIA systems have been detected for pivotal phases and elements of EIA, like screening, scoping, analysis of alternatives and of potential impacts, definition of mitigation strategies, review, decision making, public participation and follow up. - Highlights: Black-Right-Pointing-Pointer The Italian and the UK Environmental Impact Assessment systems are compared. Black-Right-Pointing-Pointer The research is centred on the construction industry. Black-Right-Pointing-Pointer Issues and shortcomings are analysed by investigating six case studies. Black-Right-Pointing-Pointer Integration of EIA with sustainability principles is appraised. Black-Right-Pointing-Pointer General guidelines are provided to assist practitioners in the two national contexts.« less

  11. Building America Case Study: Ground Source Heat Pump Research, TaC Studios Residence, Atlanta, Georigia (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2014-09-01

    As part of the NAHB Research Center Industry Partnership, Southface partnered with TaC Studios, an Atlanta based architecture firm specializing in residential and light commercial design, on the construction of a new test home in Atlanta, GA in the mixed-humid climate. This home serves as a residence and home office for the firm's owners, as well as a demonstration of their design approach to potential and current clients. Southface believes the home demonstrates current best practices for the mixed-humid climate, including a building envelope featuring advanced air sealing details and low density spray foam insulation, glazing that exceeds ENERGY STARmore » requirements, and a high performance heating and cooling system. Construction quality and execution was a high priority for TaC Studios and was ensured by a third party review process. Post construction testing showed that the project met stated goals for envelope performance, an air infiltration rate of 2.15 ACH50. The homeowner's wished to further validate whole house energy savings through the project's involvement with Building America and this long-term monitoring effort. As a Building America test home, this home was evaluated to detail whole house energy use, end use loads, and the efficiency and operation of the ground source heat pump and associated systems. Given that the home includes many non-typical end use loads including a home office, pool, landscape water feature, and other luxury features not accounted for in Building America modeling tools, these end uses were separately monitored to determine their impact on overall energy consumption.« less

  12. Impact of senior design project for the development of leadership and management skills in construction management

    NASA Astrophysics Data System (ADS)

    Chowdhury, Tamara

    2013-08-01

    Senior design courses are a core part of curricula across engineering and technology disciplines. Such courses offer Construction Management (CMG) students the opportunity to bring together, assimilate and apply the knowledge they have acquired over their entire undergraduate academic programme to an applied technical project. Senior or Capstone design course engages students in a real-world project, enhance leadership development, and prepare to manage and lead project teams. The CMG programme's multidisciplinary approach at Alabama A&M University, combines essential components of construction techniques with concepts of business management to develop technically qualified individuals for responsible management roles in the design, construction and operation of major construction projects. This paper analyses the performance of the students and improvement due to the interaction with the faculty advisors and industrial panel during the two semester Capstone project. The results of this Capstone sequence have shown a continuous improvement of student performance.

  13. Strategy for Improved Representation of Magnetospheric Electric Potential Structure on a Polar-Capped Ionosphere

    NASA Astrophysics Data System (ADS)

    Schulz, M.

    2016-12-01

    In some simple models of magnetospheric electrodynamics [e.g., Volland, Ann. Géophys., 31, 159-173, 1975], the normal component of the convection electric field is discontinuous across the boundary between closed and open magnetic field lines, and this discontinuity facilitates the formation of auroral arcs there. The requisite discontinuity in E is achieved by making the scalar potential proportional to a positive power (typically 1 or 2) of L on closed field lines and to a negative power (typically -1/2) of L on open (i.e., polar-cap) field lines. This suggests that it may be advantageous to construct more realistic (and thus more complicated) empirical magnetospheric and ionospheric electric-field models from superpositions of mutually orthogonal (or not) vector basis functions having this same analytical property (i.e., discontinuity at L = L*, the boundary surface between closed and open magnetic field lines). The present work offers a few examples of such constructions. A major challenge in this project has been to devise a coordinate system that simplifies the required analytical expansions of electric scalar potentials and accommodates the anti-sunward offset of each polar-cap boundary's centroid with respect to the corresponding magnetic pole. For circular northern and southern polar caps containing equal amounts of magnetic flux, one can imagine a geometrical construction of nested circular (but non-concentric) contours of constant quasi-latitude whose centers converge toward the magnetic poles as the contours themselves approach the magnetic equator. For more general polar-cap shapes and (in any case) to assure mutual orthogonality of respective coordinate surfaces on a spherical ionosphere, a formulation based on harmonic coordinates (expanded from eigen-solutions of the two-dimensional Laplace equation) may be preferable.

  14. 42 CFR 137.275 - May Self-Governance Tribes include IHS construction programs in a construction project agreement...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...

  15. 42 CFR 137.275 - May Self-Governance Tribes include IHS construction programs in a construction project agreement...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...

  16. 42 CFR 137.275 - May Self-Governance Tribes include IHS construction programs in a construction project agreement...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...

  17. 42 CFR 137.275 - May Self-Governance Tribes include IHS construction programs in a construction project agreement...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...

  18. 42 CFR 137.275 - May Self-Governance Tribes include IHS construction programs in a construction project agreement...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false May Self-Governance Tribes include IHS construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.275 May Self... agreement? Yes, Self-Governance Tribes may choose to assume construction programs in a construction project...

  19. 42 CFR 137.328 - Must a construction project proposal incorporate provisions of Federal construction guidelines...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...

  20. 42 CFR 137.328 - Must a construction project proposal incorporate provisions of Federal construction guidelines...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...

  1. 42 CFR 137.328 - Must a construction project proposal incorporate provisions of Federal construction guidelines...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...

  2. 42 CFR 137.328 - Must a construction project proposal incorporate provisions of Federal construction guidelines...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...

  3. 42 CFR 137.328 - Must a construction project proposal incorporate provisions of Federal construction guidelines...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., the Self-Governance Tribe and the Secretary must agree upon and specify appropriate building codes and...-Governance Tribe in the preparation of its construction project proposal. If Tribal construction codes and standards (including national, regional, State, or Tribal building codes or construction industry standards...

  4. An innovative time-cost-quality tradeoff modeling of building construction project based on resource allocation.

    PubMed

    Hu, Wenfa; He, Xinhua

    2014-01-01

    The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated.

  5. 42 CFR 137.291 - May Self-Governance Tribes carry out construction projects without assuming these Federal...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...-Governance Tribes carry out construction projects without assuming these Federal environmental... 42 Public Health 1 2011-10-01 2011-10-01 false May Self-Governance Tribes carry out construction projects without assuming these Federal environmental responsibilities? 137.291 Section 137.291 Public...

  6. 18 CFR 4.104 - Amendment of exemption.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... change the design, location, method of construction or operation of its project, it must first notify the..., location, method of construction or operation of the project, the exemption holder may implement the..., method of construction or the operation of the project works, the exemption holder may not implement the...

  7. Evaluation of target efficiencies for solid-liquid separation steps in biofuels production.

    PubMed

    Kochergin, Vadim; Miller, Keith

    2011-01-01

    Development of liquid biofuels has entered a new phase of large scale pilot demonstration. A number of plants that are in operation or under construction face the task of addressing the engineering challenges of creating a viable plant design, scaling up and optimizing various unit operations. It is well-known that separation technologies account for 50-70% of both capital and operating cost. Additionally, reduction of environmental impact creates technological challenges that increase project cost without adding to the bottom line. Different technologies vary in terms of selection of unit operations; however, solid-liquid separations are likely to be a major contributor to the overall project cost. Despite the differences in pretreatment approaches, similar challenges arise for solid-liquid separation unit operations. A typical process for ethanol production from biomass includes several solid-liquid separation steps, depending on which particular stream is targeted for downstream processing. The nature of biomass-derived materials makes it either difficult or uneconomical to accomplish complete separation in a single step. Therefore, setting realistic efficiency targets for solid-liquid separations is an important task that influences overall process recovery and economics. Experimental data will be presented showing typical characteristics for pretreated cane bagasse at various stages of processing into cellulosic ethanol. Results of generic material balance calculations will be presented to illustrate the influence of separation target efficiencies on overall process recoveries and characteristics of waste streams.

  8. VirtualSpace: A vision of a machine-learned virtual space environment

    NASA Astrophysics Data System (ADS)

    Bortnik, J.; Sarno-Smith, L. K.; Chu, X.; Li, W.; Ma, Q.; Angelopoulos, V.; Thorne, R. M.

    2017-12-01

    Space borne instrumentation tends to come and go. A typical instrument will go through a phase of design and construction, be deployed on a spacecraft for several years while it collects data, and then be decommissioned and fade into obscurity. The data collected from that instrument will typically receive much attention while it is being collected, perhaps in the form of event studies, conjunctions with other instruments, or a few statistical surveys, but once the instrument or spacecraft is decommissioned, the data will be archived and receive progressively less attention with every passing year. This is the fate of all historical data, and will be the fate of data being collected by instruments even at the present time. But what if those instruments could come alive, and all be simultaneously present at any and every point in time and space? Imagine the scientific insights, and societal gains that could be achieved with a grand (virtual) heliophysical observatory that consists of every current and historical mission ever deployed? We propose that this is not just fantasy but is imminently doable with the data currently available, with the present computational resources, and with currently available algorithms. This project revitalizes existing data resources and lays the groundwork for incorporating data from every future mission to expand the scope and refine the resolution of the virtual observatory. We call this project VirtualSpace: a machine-learned virtual space environment.

  9. Ranking the Project Management Success Factors for Construction Project in South India

    NASA Astrophysics Data System (ADS)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  10. Adding Impacts and Mitigation Measures to OpenEI's RAPID Toolkit

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vogel, Erin

    The Open Energy Information platform hosts the Regulatory and Permitting Information Desktop (RAPID) Toolkit to provide renewable energy permitting information on federal and state regulatory processes. One of the RAPID Toolkit's functions is to help streamline the geothermal permitting processes outlined in the National Environmental Policy Act (NEPA). This is particularly important in the geothermal energy sector since each development phase requires separate land analysis to acquire exploration, well field drilling, and power plant construction permits. Using the Environmental Assessment documents included in RAPID's NEPA Database, the RAPID team identified 37 resource categories that a geothermal project may impact. Examplesmore » include impacts to geology and minerals, nearby endangered species, or water quality standards. To provide federal regulators, project developers, consultants, and the public with typical impacts and mitigation measures for geothermal projects, the RAPID team has provided overview webpages of each of these 37 resource categories with a sidebar query to reference related NEPA documents in the NEPA Database. This project is an expansion of a previous project that analyzed the time to complete NEPA environmental review for various geothermal activities. The NEPA review not only focused on geothermal projects within the Bureau of Land Management and U.S. Forest Service managed lands, but also projects funded by the Department of Energy. Timeline barriers found were: extensive public comments and involvement; content overlap in NEPA documents, and discovery of impacted resources such as endangered species or cultural sites.« less

  11. The Sulcis Storage Project: Status of the First Italian Initiative for Pilot-Scale Geological Sequestration of CO2

    NASA Astrophysics Data System (ADS)

    Plaisant, A.; Maggio, E.; Pettinau, A.

    2016-12-01

    The deep aquifer located at a depth of about 1000-1500 m within fractured carbonate in the Sulcis coal basin (South-West Sardinia, Italy) constitutes a potential reservoir to develop a pilot-scale CO2 storage site. The occurrence of several coal mines and the geology of the basin also provide favourable condition to install a permanent infrastructures where advanced CO2 storage technologies can be developed. Overall, the Sulcis project will allow to characterize the Sulcis coal basin (South West Sardinia, Italy) and to develop a permanent infrastructure (know-how, equipment, laboratories, etc.) for advanced international studies on CO2 storage. The research activities are structured in two different phases: (i) site characterization, including the construction of an underground and a fault laboratories and (ii) the installation of a test site for small-scale injection of CO2. In particular, the underground laboratory will host geochemical and geophysical experiments on rocks, taking advantages of the buried environment and the very well confined conditions in the galleries; in parallel, the fault laboratory will be constructed to study CO2 leakage phenomena in a selected fault. The project is currently ongoing and some preliminary results will be presented in this work as well as the structure of the project as a whole. More in detail, preliminary activities comprise: (i) geochemical monitoring; (ii) the minero-petrographycal, physical and geophysical characterization of the rock samples; (iii) the development of both static and dynamic geological models of the reservoir; (iv) the structural geology and fault analysis; (v) the assessment of natural seismicity through a monitoring network (vi) the re-processing and the analysis of the reflection seismic data. Future activities will comprise: (i) the drilling of shallow exploration wells near the faults; (ii) the construction of both the above mentioned laboratories; (iii) drilling of a deep exploration well (1,500 m); (iv) injection tests. Preliminary analyses show that the rocks of the carbonate formation present a low porosity, but the formation is characterized by a good permeability for fractures and karst. The faults are typically sealed and petrophysical properties of caprock and reservoir are spatially heterogeneous.

  12. Study on evaluation of construction reliability for engineering project based on fuzzy language operator

    NASA Astrophysics Data System (ADS)

    Shi, Yu-Fang; Ma, Yi-Yi; Song, Ping-Ping

    2018-03-01

    System Reliability Theory is a research hotspot of management science and system engineering in recent years, and construction reliability is useful for quantitative evaluation of project management level. According to reliability theory and target system of engineering project management, the defination of construction reliability appears. Based on fuzzy mathematics theory and language operator, value space of construction reliability is divided into seven fuzzy subsets and correspondingly, seven membership function and fuzzy evaluation intervals are got with the operation of language operator, which provides the basis of corresponding method and parameter for the evaluation of construction reliability. This method is proved to be scientific and reasonable for construction condition and an useful attempt for theory and method research of engineering project system reliability.

  13. The "Haunt" project: an attempt to build a "haunted" room by manipulating complex electromagnetic fields and infrasound.

    PubMed

    French, Christopher C; Haque, Usman; Bunton-Stasyshyn, Rosie; Davis, Rob

    2009-05-01

    Recent research has suggested that a number of environmental factors may be associated with a tendency for susceptible individuals to report mildly anomalous sensations typically associated with "haunted" locations, including a sense of presence, feeling dizzy, inexplicable smells, and so on. Factors that may be associated with such sensations include fluctuations in the electromagnetic field (EMF) and the presence of infrasound. A review of such work is presented, followed by the results of the "Haunt" project in which an attempt was made to construct an artificial "haunted" room by systematically varying such environmental factors. Participants (N=79) were required to spend 50 min in a specially constructed chamber, within which they were exposed to infrasound, complex EMFs, both or neither. They were informed in advance that during this period they might experience anomalous sensations and asked to record on a floor plan their location at the time of occurrence of any such sensations, along with a note of the time of occurrence and a brief description of the sensation. Upon completing the session in the experimental chamber, they were asked to complete three questionnaires. The first was an EXIT scale asking respondents to indicate whether or not they had experienced particular anomalous sensations. The second was the Australian Sheep-Goat Scale, a widely used measure of belief in and experience of the paranormal. The third was Persinger's Personal Philosophy Inventory, although only the items that constitute the Temporal Lobe Signs (TLS) Inventory sub-scale were scored. These items deal with psychological experiences typically associated with temporal lobe epilepsy but normally distributed throughout the general population. Although many participants reported anomalous sensations of various kinds, the number reported was unrelated to experimental condition but was related to TLS scores. The most parsimonious explanation for our findings is in terms of suggestibility.

  14. Managing the construction bidding process : a move to simpler construction plan sets

    DOT National Transportation Integrated Search

    2001-01-31

    This project was conducted to determine whether construction plan sets could be significantly simplified to speed the process of moving projects to construction. The work steps included a literature review, a telephone survey of highway agencies in s...

  15. 26 CFR 1.1039-1 - Certain sales of low-income housing projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... considered as the purchase or construction by A of such a project. (2) Special rules. (i) The cost of a... capital expenditures by the taxpayer that are attributable to acquisition, construction, or reconstruction..., 1970. If the taxpayer had begun construction of another qualified housing project on January 1, 1969...

  16. 26 CFR 1.1039-1 - Certain sales of low-income housing projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... considered as the purchase or construction by A of such a project. (2) Special rules. (i) The cost of a... capital expenditures by the taxpayer that are attributable to acquisition, construction, or reconstruction..., 1970. If the taxpayer had begun construction of another qualified housing project on January 1, 1969...

  17. 77 FR 25080 - Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ...-AA00 Safety Zones; TriMet Bridge Project, Willamette River, Portland, OR AGENCY: Coast Guard, DHS... trestles and construction cranes involved in the construction of the TriMet Bridge on the Willamette River... project. These safety zones replace the prior safety zones established for the TriMet Bridge construction...

  18. Use of safety management practices for improving project performance.

    PubMed

    Cheng, Eddie W L; Kelly, Stephen; Ryan, Neal

    2015-01-01

    Although site safety has long been a key research topic in the construction field, there is a lack of literature studying safety management practices (SMPs). The current research, therefore, aims to test the effect of SMPs on project performance. An empirical study was conducted in Hong Kong and the data collected were analysed with multiple regression analysis. Results suggest that 3 of the 15 SMPs, which were 'safety committee at project/site level', 'written safety policy', and 'safety training scheme' explained the variance in project performance significantly. Discussion about the impact of these three SMPs on construction was provided. Assuring safe construction should be an integral part of a construction project plan.

  19. Concentrating Solar Power Projects - Hami 50 MW CSP Project | Concentrating

    Science.gov Websites

    Solar Power | NREL Hami 50 MW CSP Project Status Date: April 6, 2018 Project Overview Project MW Status: Under construction Do you have more information, corrections, or comments? Background Technology: Power tower Status: Under construction Country: China City: Hami Region: Xinjiang Autonomous

  20. Constructability issues on KyTC projects.

    DOT National Transportation Integrated Search

    2003-07-01

    A successful constructibility review process for a transportation agency must follow an established methodology similar to value engineering. The process must be flexible and address the critical issues impacting transportation construction projects,...

  1. Identification of Tools and Techniques to Enhance Interdisciplinary Collaboration During Design and Construction Projects.

    PubMed

    Keys, Yolanda; Silverman, Susan R; Evans, Jennie

    2017-10-01

    The purpose of this study was to collect the perceptions of design professionals and clinicians regarding design process success strategies and elements of interprofessional engagement and communication during healthcare design and construction projects. Additional objectives were to gather best practices to maximize clinician engagement and provide tools and techniques to improve interdisciplinary collaboration for future projects. Strategies are needed to enhance the design and construction process and create interactions that benefit not only the project but the individuals working to see its completion. Meaningful interprofessional collaboration is essential to any healthcare design project and making sure the various players communicate is a critical element. This was a qualitative study conducted via an online survey. Respondents included architects, construction managers, interior designers, and healthcare personnel who had recently been involved in a building renovation or new construction project for a healthcare facility. Responses to open-ended questions were analyzed for themes, and descriptive statistics were used to provide insight into participant demographics. Information on the impressions, perceptions, and opportunities related to clinician involvement in design projects was collected from nurses, architects, interior designers, and construction managers. Qualitative analysis revealed themes of clinician input, organizational dynamics, and a variety of communication strategies to be the most frequently mentioned elements of successful interprofessional collaboration. This study validates the need to include clinician input in the design process, to consider the importance of organizational dynamics on design team functioning, and to incorporate effective communication strategies during design and construction projects.

  2. Vibration and noise criteria used to evaluate environmental impacts of transportation projects on sensitive facilities

    NASA Astrophysics Data System (ADS)

    Busch, Todd; Gendreau, Michael; Amick, Hal

    2005-08-01

    The paper examines the methodologies and evaluation criteria advocated by the U.S. Federal Transit Administration (FTA) and Federal Rail Administration (FRA) used to determine whether or not a proposed alignment for a transportation project adversely impacts affected land uses, such as research & development and high-technology manufacturing. The criteria in question are applied as limits on vibration and noise at sensitive receiver locations. Both short-term construction and long-term transportation operations are typically considered, with the latter being the focus of this paper. A case study is presented of a proposed transit system that passes through four different soil zones, the operational characteristics that are required to generate a vibration level equal to the FTA/FRA advocated level of 65 VdB re: 1 micro-inch/sec, and the range of variability of the acceptability of the vibration conditions when considered in terms of third-octave bands compared to vibration criterion (VC) curves that are used as the design performance targets of vibration-sensitive facilities.

  3. Towards a theoretical clarification of biomimetics using conceptual tools from engineering design.

    PubMed

    Drack, M; Limpinsel, M; de Bruyn, G; Nebelsick, J H; Betz, O

    2017-12-13

    Many successful examples of biomimetic products are available, and most research efforts in this emerging field are directed towards the development of specific applications. The theoretical and conceptual underpinnings of the knowledge transfer between biologists, engineers and architects are, however, poorly investigated. The present article addresses this gap. We use a 'technomorphic' approach, i.e. the application of conceptual tools derived from engineering design, to better understand the processes operating during a typical biomimetic research project. This helps to elucidate the formal connections between functions, working principles and constructions (in a broad sense)-because the 'form-function-relationship' is a recurring issue in biology and engineering. The presented schema also serves as a conceptual framework that can be implemented for future biomimetic projects. The concepts of 'function' and 'working principle' are identified as the core elements in the biomimetic knowledge transfer towards applications. This schema not only facilitates the development of a common language in the emerging science of biomimetics, but also promotes the interdisciplinary dialogue among its subdisciplines.

  4. Wide field imaging problems in radio astronomy

    NASA Astrophysics Data System (ADS)

    Cornwell, T. J.; Golap, K.; Bhatnagar, S.

    2005-03-01

    The new generation of synthesis radio telescopes now being proposed, designed, and constructed face substantial problems in making images over wide fields of view. Such observations are required either to achieve the full sensitivity limit in crowded fields or for surveys. The Square Kilometre Array (SKA Consortium, Tech. Rep., 2004), now being developed by an international consortium of 15 countries, will require advances well beyond the current state of the art. We review the theory of synthesis radio telescopes for large fields of view. We describe a new algorithm, W projection, for correcting the non-coplanar baselines aberration. This algorithm has improved performance over those previously used (typically an order of magnitude in speed). Despite the advent of W projection, the computing hardware required for SKA wide field imaging is estimated to cost up to $500M (2015 dollars). This is about half the target cost of the SKA. Reconfigurable computing is one way in which the costs can be decreased dramatically.

  5. METABOLIC ENGINEERING TO DEVELOP A PATHWAY FOR THE SELECTIVE CLEAVAGE OF CARBON-NITROGEN BONDS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    John J. Kilbane III

    The objective of the project is to develop biochemical pathways for the selective cleavage of C-N bonds in molecules found in petroleum. The initial phase of the project will focus on the isolation or development of an enzyme capable of cleaving the C-N bond in aromatic amides, specifically 2-aminobiphenyl. The objective of the second phase of the research will be to construct a biochemical pathway for the selective removal of nitrogen from carbazole by combining the carA genes from Sphingomonas sp. GTIN11 with the gene(s) encoding an appropriate amidase. The objective of the final phase of the project will bemore » to develop derivative CN bond cleaving enzymes that have broader substrate ranges and to demonstrate the use of such strains to selectively remove nitrogen from petroleum. The project is on schedule and no major difficulties have been encountered. During the first year of the project (October, 2002-September, 2003) enrichment culture experiments have resulted in the isolation of promising cultures that may be capable of cleaving C-N bonds in aromatic amides, several amidase genes have been cloned and are currently undergoing directed evolution to obtain derivatives that can cleave C-N bonds in aromatic amides, and the carA genes from Sphingomonas sp. GTIN11, and Pseudomonas resinovorans CA10 were cloned in vectors capable of replicating in Escherichia coli. Future research will address expression of these genes in Rhodococcus erythropolis. Enrichment culture experiments and directed evolution experiments continue to be a main focus of research activity and further work is required to obtain an appropriate amidase that will selectively cleave C-N bonds in aromatic substrates. Once an appropriate amidase gene is obtained it must be combined with genes encoding an enzyme capable of converting carbazole to 2'aminobiphenyl-2,3-diol: specifically carA genes. The carA genes from two sources have been cloned and are ready for construction of C-N bond cleavage pathway. The construction of a new metabolic pathway to selectively remove nitrogen from carbazole and other molecules typically found in petroleum should lead to the development of a process to improve oil refinery efficiency by reducing the poisoning, by nitrogen, of catalysts used in the hydrotreating and catalytic cracking of petroleum.« less

  6. SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT PROJECT.

    ERIC Educational Resources Information Center

    BOICE, JOHN,; AND OTHERS

    ONE-HUNDRED MANUFACTURERS EXPRESSED INTEREST IN BIDDING FOR A SYSTEM ON SCHOOL CONSTRUCTION CALLED SCSD OR SCHOOL CONSTRUCTION SYSTEMS DEVELOPMENT TO THE FIRST CALIFORNIA COMMISSION ON SCHOOL CONSTRUCTION SYSTEMS. TWENTY-TWO BUILDINGS COMPRISED THE PROJECT. THE OBJECTIVE WAS TO DEVELOP AN INTEGRATED SYSTEM OF STANDARD SCHOOL BUILDING COMPONENTS…

  7. Algorithm for evaluating the effectiveness of a high-rise development project based on current yield

    NASA Astrophysics Data System (ADS)

    Soboleva, Elena

    2018-03-01

    The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.

  8. Identifying challenges in project consultants engagement practices

    NASA Astrophysics Data System (ADS)

    Shariffuddin, Nadia Alina Amir; Abidin, Nazirah Zainul

    2017-10-01

    Construction projects, green or conventional, involve multi-faceted disciplines engaged with the goal of delivering products i.e. building, infrastructure etc. at the best quality within stipulated budgets. For green projects, additional attention is added for environmental quality. Due to the various responsibilities and liabilities involved as well as the complexity of the construction process itself, formal engagement of multi-disciplinary professionals i.e. project consultants is required in any construction project. Poor selection of project consultants will lead to a multitude of complications resulting in delay, cost escalation, conflicts and poor quality. This paper explores the challenges that occur during the engagement of project consultants in a green project. As the engagement decision involves developers and architects, these two groups of respondents with green project backgrounds were approached qualitatively using interview technique. The challenges identified are limited experience and knowledge, consultants' fee vs. quality, green complexity, conflicts of interest, clients' extended expectation and less demand in green projects. The construction shifts to green project demands engagement of project consultants with added skills. It is expected that through the identification of challenges, better management and administration can be created which would give impact to the overall process of engagement in green projects.

  9. An Innovative Time-Cost-Quality Tradeoff Modeling of Building Construction Project Based on Resource Allocation

    PubMed Central

    2014-01-01

    The time, quality, and cost are three important but contradictive objectives in a building construction project. It is a tough challenge for project managers to optimize them since they are different parameters. This paper presents a time-cost-quality optimization model that enables managers to optimize multiobjectives. The model is from the project breakdown structure method where task resources in a construction project are divided into a series of activities and further into construction labors, materials, equipment, and administration. The resources utilized in a construction activity would eventually determine its construction time, cost, and quality, and a complex time-cost-quality trade-off model is finally generated based on correlations between construction activities. A genetic algorithm tool is applied in the model to solve the comprehensive nonlinear time-cost-quality problems. Building of a three-storey house is an example to illustrate the implementation of the model, demonstrate its advantages in optimizing trade-off of construction time, cost, and quality, and help make a winning decision in construction practices. The computational time-cost-quality curves in visual graphics from the case study prove traditional cost-time assumptions reasonable and also prove this time-cost-quality trade-off model sophisticated. PMID:24672351

  10. The IPHI Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ferdinand, Robin; Beauvais, Pierre-Yves

    High Power Proton Accelerators (HPPAs) are studied for several projects based on high-flux neutron sources driven by proton or deuteron beams. Since the front end is considered as the most critical part of such accelerators, the two French national research agencies CEA and CNRS decided to collaborate in 1997 to study and build a High-Intensity Proton Injector (IPHI). The main objective of this project is to master the complex technologies used and the concepts of manufacturing and controlling the HPPAs. Recently, a collaboration agreement was signed with CERN and led to some evolutions in the design and in the schedule.more » The IPHI design current was maintained at 100 mA in Continuous Wave mode. This choice should allow to produce a high reliability beam at reduced intensity (typically 30 mA) tending to fulfill the Accelerator Driven System requirements. The output energy of the Radio Frequency Quadrupole (RFQ), was reduced from 5 to 3 MeV, allowing then the adjunction and the test, in pulsed operation of a chopper line developed by CERN for the Superconducting Proton Linac (SPL). In a final step, the IPHI RFQ and the chopper line should become parts of the SPL injector. In this paper, the IPHI project and the recent evolutions are reported together with the construction and operation schedule.« less

  11. Social cost in construction projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Çelik, Tolga, E-mail: tolga.celik@emu.edu.tr; Kamali, Saeed, E-mail: saeedkamali2002@gmail.com; Arayici, Yusuf, E-mail: yusuf.arayici@hku.edu.tr

    Despite the fact that completion of construction projects has a direct positive impact on the growth of national and local economies as well as humans' wellbeing, construction projects, especially in the urban areas, generate serious environmental nuisances for the adjacent residents and have unintentional adverse impacts on their surrounding environment. Construction causative adverse impacts on the neighbouring communities are known as the social costs. This study aims to present a state-of-the-art overview of social costs in construction industry in terms of definition, consideration, classification and quantification. Furthermore, it is aimed to bring the construction social cost phenomenon for the agendamore » of Environmental Impact Assessors.« less

  12. Improving concrete overlay construction.

    DOT National Transportation Integrated Search

    2010-03-01

    Several road construction projects involving concrete overlays at the state and county levels in Iowa in 2009 were studied for : construction techniques and methods. The projects that were evaluated consisted of sites in four Iowa counties: Osceola, ...

  13. Risk Management in Construction Project: Taking Fairness into Account

    NASA Astrophysics Data System (ADS)

    Górecki, Jarosław; Bizon-Górecka, Jadwiga

    2017-10-01

    Risk management requires a comprehensive review of possible hazards, their possible outcomes as well as some recommendations about minimizing the risk. The study emphasises that the project risk management refers to an analysis of the risk factors and a creation of the strategy minimising negative effects of the risk. It was pointed out that a construction project is this kind of projects that can be defined as a unique process of high complexity (design documentation, various stages of creating the building), which has clearly defined time frames and a given financial limit. It is executed as a team work, by qualified or highly qualified specialists of different matters, for example masonry, precast, etc. Additionally, it requires a use of modern equipment and an adequate preparation of the investment. Therefore, the risk management focuses on the problems allowing for troubleshooting. A basis of the risk management is to recognise the fundamentals, which are crucial for the construction project management, i.e. an object perspective, including technological, supporting and management processes as well as an entity perspective - project stakeholders. Construction projects require also an acquaintance with the specificity of the branch. The article refers to the risk management in construction project and, in particular, a phenomenon of participants’ fairness in such projects. The problem of fairness of the entities involved in a project should be understood as a fair play, according to the arrangements agreed in a contract and compatible with current formal procedures and social rules. It was indicated that fairness can be treated as an important factor in predicting the success of such projects. Interviews conducted among contractors in Kuyavian-Pomeranian region showed varied fairness requirements put to individual participants of construction projects. The article presents results of the research. It shows a desired attitude of the surveyed enterprises towards a problem of the fair behaviour. These behaviours, relating to individual stakeholders, have been underlined in different phases of the construction projects’ life cycle.

  14. Assessing the costs attributed to project delay during project pre-construction stages

    DOT National Transportation Integrated Search

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  15. Assessing the costs attributed to project delay during project pre-construction stages.

    DOT National Transportation Integrated Search

    2016-03-01

    This project for the Texas Department of Transportation (TxDOT) developed a simple but sound : methodology for estimating the cost of delaying most types of highway projects. Researchers considered the : cost of delays during the pre-construction pha...

  16. CAP: Construction Assistance Plan. Handbook for Construction Project Planning, Oregon Community Colleges.

    ERIC Educational Resources Information Center

    Duncan, Verne A.

    This handbook for construction project planning was developed to be used by the Oregon Department of Education to evaluate existing facilities and determine the projected needs for each of the community college districts. Each college district's eligibility for state participation in funding is based on a Basic Space Need (BSN) which is the square…

  17. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the construction of a rural water supply project under this program? 404.12 Section 404.12 Public... RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.12 Can Reclamation provide assistance with the construction of a rural water supply project under this program? Reclamation may provide assistance with the...

  18. Construction Management for Educational Facilities: Professional Services' Procurement and Competitive Bid Statutes.

    ERIC Educational Resources Information Center

    Goldblatt, Steven M.; Wood, R. Craig

    Construction management is utilized when a school district engages a firm to coordinate a total project. The construction management seeks to save an owner time and cost primarily through better contractor coordination and project management. These services may include the planning and design phases of the project as well as the actual…

  19. 42 CFR 137.342 - What happens to funds remaining at the conclusion of a cost reimbursement construction project?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false What happens to funds remaining at the conclusion of a cost reimbursement construction project? 137.342 Section 137.342 Public Health PUBLIC HEALTH... remaining at the conclusion of a cost reimbursement construction project? All funds, including contingency...

  20. Communication, coordination and cooperation in construction projects: business environment and human behaviours

    NASA Astrophysics Data System (ADS)

    Salah Alaloul, Wesam; Shahir Liew, Mohd; Zawawi, Noor Amila Wan

    2017-12-01

    The accomplishment of construction projects is extremely dependent on the integration of several stakeholders; therefore none of them has the control or the ability to accomplish the project alone. Each of them may influence and be influenced by the project management approach. There is no comprehensive theoretical platform for defining Communication, Coordination and Cooperation (3Cs) in the management of construction project. This paper deliberates the function of the 3Cs different theoretical perceptions. Through an analysis of selected articles from reputable academic journals in construction management, the business environment and human behaviour were identified as two main parts. A little has been done so far about the 3Cs, and how they are correlated with construction projects performance. Therefore, the objective of this paper is to explain the definitions and the association between the 3Cs. There is a significant link between communication and coordination. Coordination alternatively, is trust-based a logic of mutual and exchange. Consequently, cooperation is much more sophisticated, which needing more time and attempts.

  1. The influence of client brief and change order in construction project

    NASA Astrophysics Data System (ADS)

    Mahat, N. A. A.; Adnan, H.

    2018-02-01

    Construction briefing is a statement of needs about intentions and projects objectives. Briefing process is the preliminary stage in the design process and successful briefing can achieve project delivery right on target time, cost and quality of project confidently. Although there are many efforts to approach client’s requirement and needs for a project, it is still not collected adequately to make proper solutions in design. Thus, these may lead the client to include change orders during the construction phase. This paper is concerned toward the influence of client’s briefing of a construction project that impact on the change order on the construction works. The research objective is to identify the influence of client’s brief on change orders, therefore, the aims of the research is to reduce change orders in project delivery. This research adopted both qualitative and quantitative data collection methods which are content analysis and semi structure interview. The findings highlight factors contributing to change orders and the essential attributes of clients during the briefing stage that may help minimise them.

  2. A Review of Prominent Psychological Injury Constructs.

    ERIC Educational Resources Information Center

    Morrissette, Patrick J.

    2003-01-01

    Constructs that are typically associated with helping professional psychological injury include secondary traumatic stress disorder/compassion fatigue, critical incident stress, vicarious traumatization, and burnout. This paper provides clarification by identifying existing constructs and describing similarities and differences. Construct…

  3. Additive Construction with Mobile Emplacement (ACME)

    NASA Technical Reports Server (NTRS)

    Vickers, John

    2015-01-01

    The Additive Construction with Mobile Emplacement (ACME) project is developing technology to build structures on planetary surfaces using in-situ resources. The project focuses on the construction of both 2D (landing pads, roads, and structure foundations) and 3D (habitats, garages, radiation shelters, and other structures) infrastructure needs for planetary surface missions. The ACME project seeks to raise the Technology Readiness Level (TRL) of two components needed for planetary surface habitation and exploration: 3D additive construction (e.g., contour crafting), and excavation and handling technologies (to effectively and continuously produce in-situ feedstock). Additionally, the ACME project supports the research and development of new materials for planetary surface construction, with the goal of reducing the amount of material to be launched from Earth.

  4. Geological Prediction Ahead of Tunnel Face in the Limestone Formation Tunnel using Multi-Modal Geophysical Surveys

    NASA Astrophysics Data System (ADS)

    Zaki, N. F. M.; Ismail, M. A. M.; Hazreek Zainal Abidin, Mohd; Madun, Aziman

    2018-04-01

    Tunnel construction in typical karst topography face the risk which unknown geological condition such as abundant rainwater, ground water and cavities. Construction of tunnel in karst limestone frequently lead to potentially over-break of rock formation and cause failure to affected area. Physical character of limestone which consists large cavity prone to sudden failure and become worsen due to misinterpretation of rock quality by engineer and geologists during analysis stage and improper method adopted in construction stage. Consideration for execution of laboratory and field testing in rock limestone should be well planned and arranged in tunnel construction project. Several tests including Ground Penetration Radar (GPR) and geological face mapping were studied in this research to investigate the performances of limestone rock in tunnel construction, measured in term of rock mass quality that used for risk assessment. The objective of this study is to focus on the prediction of geological condition ahead of tunnel face using short range method (GPR) and verified by geological face mapping method to determine the consistency of actual geological condition on site. Q-Value as the main indicator for rock mass classification was obtained from geological face mapping method. The scope of this study is covering for tunnelling construction along 756 meters in karst limestone area which located at Timah Tasoh Tunnel, Bukit Tebing Tinggi, Perlis. For this case study, 15% of GPR results was identified as inaccurate for rock mass classification in which certain chainage along this tunnel with 34 out of 224 data from GPR was identified as incompatible with actual face mapping.

  5. Safety risk assessment using analytic hierarchy process (AHP) during planning and budgeting of construction projects.

    PubMed

    Aminbakhsh, Saman; Gunduz, Murat; Sonmez, Rifat

    2013-09-01

    The inherent and unique risks on construction projects quite often present key challenges to contractors. Health and safety risks are among the most significant risks in construction projects since the construction industry is characterized by a relatively high injury and death rate compared to other industries. In construction project management, safety risk assessment is an important step toward identifying potential hazards and evaluating the risks associated with the hazards. Adequate prioritization of safety risks during risk assessment is crucial for planning, budgeting, and management of safety related risks. In this paper, a safety risk assessment framework is presented based on the theory of cost of safety (COS) model and the analytic hierarchy process (AHP). The main contribution of the proposed framework is that it presents a robust method for prioritization of safety risks in construction projects to create a rational budget and to set realistic goals without compromising safety. The framework provides a decision tool for the decision makers to determine the adequate accident/injury prevention investments while considering the funding limits. The proposed safety risk framework is illustrated using a real-life construction project and the advantages and limitations of the framework are discussed. Copyright © 2013 National Safety Council and Elsevier Ltd. All rights reserved.

  6. Hiilangaay Hydroelectric Project – Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Twitchell, Sara; Stimac, Michael; Lang, Lisa

    2016-06-01

    The Hiilangaay Hydroelectric Project (“Hiilangaay” or the “Project”) is a 5-megawatt hydroelectric resource currently under construction on Prince of Wales Island (POW), Alaska, approximately ten miles east of Hydaburg. The objective of the Project is to interconnect with the existing transmission grid on Prince of Wales Island, increasing the hydroelectric generation capability by 5 MW, eliminating the need for diesel generation, increasing the reliability of the electrical system, and allowing the interconnected portion of the island to have 100 percent renewable energy generation. Pre-construction activities including construction planning, permit coordination and compliance, and final design have made it possible tomore » move forward with construction of the Hiilangaay Project. Despite repeated delays to the schedule, persistence and long-term planning will culminate in the construction of the Project, and make Prince of Wales Island independent of diesel-fueled energy« less

  7. Risk Analysis of Underestimate Cost Offer to The Project Quality in Aceh Province

    NASA Astrophysics Data System (ADS)

    Rani, Hafnidar A.

    2016-11-01

    The possibility of errors in the process of offer price determination could be enormous, so it can affect the possibility of project underestimate cost which can impact and reduce the profit if being implementing. Government Equipment/Service Procurement Policy Institution (LKPP) assesses that the practices of cheaper price in the government equipment/service procurement are still highly found and can be potential to decrease the project quality. This study aimed to analyze the most dominant factors happened in underestimate cost offer practice, to analyze the relationship of underestimate cost offer risk factors to road construction project quality in Aceh Province and to analyze the most potential factors of underestimate cost offer risk affecting road construction project quality in Aceh Province. Road construction projects observed the projects which have been implemented in Aceh Province since 2013 - 2015. This study conducted by interviewing Government Budget Authority (KPA), and distributing the questionnaire to the road construction contractors with the qualification of K1, K2, K3, M1, M2 and B1. Based on the data from Construction Service Development Institution (LPJK) of Aceh Province on 2016, the populations obtained are 2,717 constructors. By using Slovin Equation, the research samples obtained are 97 contractors. The most dominant factors in underestimate cost offer risk of the road construction projects in Aceh Province is Contingency Cost Factor which the mean is 4.374.

  8. Agricultural Construction Volume I. Arc Welding Project Construction. Instructor's Guide.

    ERIC Educational Resources Information Center

    Brzozowski, Dick; Admire, Myron

    This guide contains instructor's materials for teaching a secondary agricultural construction course consisting of instructional units on arc welding (8 lessons) and project construction (14 lessons). The materials for each unit include student objectives, a list of competencies from which the objectives were derived, suggestions for motivating…

  9. Evaluation of construction strategies for PCC pavement rehabilitation projects.

    DOT National Transportation Integrated Search

    2010-09-30

    This study investigated project management level solutions to optimizing resources, minimizing costs : (including user costs) and time for PCC pavement rehabilitation projects. This study extensively : evaluated the applicability of the Construction ...

  10. Examples of actions that improve partnering cooperation among the participants of construction projects

    NASA Astrophysics Data System (ADS)

    Radziszewska-Zielina, E.; Szewczyk, B.

    2017-10-01

    The aim of the article is to present examples of actions that can be undertaken in order to improve partnering cooperation in construction projects. These actions are a practical supplementation to the previously developed fuzzy system of controlling partnering relations in construction projects. The actions relate to 18 parameters of partnering relations that describe cooperation between a general contractor or a company that manages the project and four other participants: the contractors (subcontractors), the designer, the material and equipment suppliers and the real estate developer. The actions have been listed based on a review of subject literature, self-analysis, as well as interviews with participants of construction projects. They can provide examples of good practices that maintain partnering cooperation at a high level. Good cooperation, in turn, translates into a better performance of the project.

  11. Anomalies and contradictions in an airport construction project: a historical analysis based on Cultural-Historical Activity Theory.

    PubMed

    Lopes, Manoela Gomes Reis; Vilela, Rodolfo Andrade de Gouveia; Querol, Marco Antônio Pereira

    2018-02-19

    Large construction projects involve the functioning of a complex activity system (AS) in network format. Anomalies such as accidents, delays, reworks, etc., can be explained by contradictions that emerge historically in the system. The aim of this study was to analyze the history of an airport construction project to understand the current contradictions and anomalies in the AS and how they emerged. A case study was conducted for this purpose, combining Collective Work Analysis, interviews, observations, and analysis of documents that provided the basis for sessions in the Change Laboratory, where a participant timeline was elaborated with the principal events during the construction project. Based on the timeline, a historical analysis of the airport's AS revealed critical historical events and contradictions that explained the anomalies that occurred during the project. The analysis showed that the airport had been planned for construction with politically determined deadlines that were insufficient and inconsistent with the project's complexity. The choice of the contract modality, which assigned responsibility to a joint venture for all of the project's phases, was another critical historical event, because it allowed launching the construction before a definitive executive project had been drafted. There were also different cultures in companies working together for the first time in the context of a project with time pressures and outsourcing of activities without the necessary coordination. Identifying these contradictions and their historical origins proved essential for understanding the current situation and efforts to prevent similar situations in the future.

  12. A novel abutment construction technique for rapid bridge construction : controlled low strength Materials (CLSM) with full-height concrete panels.

    DOT National Transportation Integrated Search

    2012-01-01

    One of the major obstacles facing rapid bridge construction for typical span type bridges is the time required to construct bridge abutments and foundations. This can be remedied by using the controlled low strength materials (CLSM) bridge abutment. ...

  13. A geometric approach to problems in birational geometry.

    PubMed

    Chi, Chen-Yu; Yau, Shing-Tung

    2008-12-02

    A classical set of birational invariants of a variety are its spaces of pluricanonical forms and some of their canonically defined subspaces. Each of these vector spaces admits a typical metric structure which is also birationally invariant. These vector spaces so metrized will be referred to as the pseudonormed spaces of the original varieties. A fundamental question is the following: Given two mildly singular projective varieties with some of the first variety's pseudonormed spaces being isometric to the corresponding ones of the second variety's, can one construct a birational map between them that induces these isometries? In this work, a positive answer to this question is given for varieties of general type. This can be thought of as a theorem of Torelli type for birational equivalence.

  14. Energy engineering analysis study report, Milan Army Ammunition Plant, Milan, Tennessee: Executive summary. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1982-09-01

    This report is a summary of the Energy Engineering Analysis for the Milan Army Ammunition Plant (MAAP) in Milan, Tennessee. It includes the recommendations for the development of a Basewide Energy Plan consisting of energy conservation projects and other recommendations for reduction of the installation`s 1985 source energy consumption. Milan Army Ammunition Plant, containing 22,541 acres, is situated in both Gibson and Carroll Counties, Tennessee, and is approximately equally divided longitudinally into the two counties. The Milan area experiences typically short mild winters and long warm summers. With the exception of a few modernized facilities, the overwhelming majority of buildingsmore » at MAAP were constructed for World War II ammunition production.« less

  15. Energy Recovery Hydropower: Prospects for Off-Setting Electricity Costs for Agricultural, Municipal, and Industrial Water Providers and Users; July 2017 - September 2017

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Levine, Aaron L.; Curtis, Taylor L.; Johnson, Kurt

    Energy recovery hydropower is one of the most cost-effective types of new hydropower development because it is constructed utilizing existing infrastructure, and it is typically able to complete Federal Energy Regulatory Commission (FERC) review in 60 days. Recent changes in federal and state policy have supported energy recovery hydropower. In addition, some states have developed programs and policies to support energy recovery hydropower, including resource assessments, regulatory streamlining initiatives, and grant and loan programs to reduce project development costs. This report examines current federal and state policy drivers for energy recovery hydropower, reviews market trends, and looks ahead at futuremore » federal resource assessments and hydropower reform legislation.« less

  16. The S-curve for forecasting waste generation in construction projects.

    PubMed

    Lu, Weisheng; Peng, Yi; Chen, Xi; Skitmore, Martin; Zhang, Xiaoling

    2016-10-01

    Forecasting construction waste generation is the yardstick of any effort by policy-makers, researchers, practitioners and the like to manage construction and demolition (C&D) waste. This paper develops and tests an S-curve model to indicate accumulative waste generation as a project progresses. Using 37,148 disposal records generated from 138 building projects in Hong Kong in four consecutive years from January 2011 to June 2015, a wide range of potential S-curve models are examined, and as a result, the formula that best fits the historical data set is found. The S-curve model is then further linked to project characteristics using artificial neural networks (ANNs) so that it can be used to forecast waste generation in future construction projects. It was found that, among the S-curve models, cumulative logistic distribution is the best formula to fit the historical data. Meanwhile, contract sum, location, public-private nature, and duration can be used to forecast construction waste generation. The study provides contractors with not only an S-curve model to forecast overall waste generation before a project commences, but also with a detailed baseline to benchmark and manage waste during the course of construction. The major contribution of this paper is to the body of knowledge in the field of construction waste generation forecasting. By examining it with an S-curve model, the study elevates construction waste management to a level equivalent to project cost management where the model has already been readily accepted as a standard tool. Copyright © 2016 Elsevier Ltd. All rights reserved.

  17. Implementation Guidance for Accelerated Bridge Construction in South Dakota : Research Brief

    DOT National Transportation Integrated Search

    2017-09-01

    Investigate typical accelerated bridge construction methods and their applicability in South Dakota. A study was conducted to investigate the implementation of accelerated bridge construction (ABC) in South Dakota. The main objective of this study wa...

  18. Dynamic climate emulators for solar geoengineering

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacMartin, Douglas G.; Kravitz, Ben

    2016-12-22

    Climate emulators trained on existing simulations can be used to project project the climate effects that result from different possible future pathways of anthropogenic forcing, without further relying on general circulation model (GCM) simulations. We extend this idea to include different amounts of solar geoengineering in addition to different pathways of greenhouse gas concentrations, by training emulators from a multi-model ensemble of simulations from the Geoengineering Model Intercomparison Project (GeoMIP). The emulator is trained on the abrupt 4 × CO 2 and a compensating solar reduction simulation (G1), and evaluated by comparing predictions against a simulated 1 % per yearmore » CO 2 increase and a similarly smaller solar reduction (G2). We find reasonable agreement in most models for predicting changes in temperature and precipitation (including regional effects), and annual-mean Northern Hemisphere sea ice extent, with the difference between simulation and prediction typically being smaller than natural variability. This verifies that the linearity assumption used in constructing the emulator is sufficient for these variables over the range of forcing considered. Annual-minimum Northern Hemisphere sea ice extent is less well predicted, indicating a limit to the linearity assumption.« less

  19. 25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...

  20. 25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...

  1. 25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...

  2. 25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...

  3. 25 CFR 170.202 - Does the Relative Need Distribution Factor allocate funding among tribes?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... self-governance tribes that negotiate IRR construction projects into their AFA, and distributed to BIA... a construction project, the project must be included in an FHWA-approved Transportation Improvement...

  4. A review of risk management process in construction projects of developing countries

    NASA Astrophysics Data System (ADS)

    Bahamid, R. A.; Doh, S. I.

    2017-11-01

    In the construction industry, risk management concept is a less popular technique. There are three main stages in the systematic approach to risk management in construction industry. These stages include: a) risk response; b) risk analysis and evaluation; and c) risk identification. The high risk related to construction business affects each of its participants; while operational analysis and management of construction related risks remain an enormous task to practitioners of the industry. This paper tends towards reviewing the existing literature on construction project risk managements in developing countries specifically on risk management process. The literature lacks ample risk management process approach capable of capturing risk impact on diverse project objectives. This literature review aims at discovering the frequently used techniques in risk identification and analysis. It also attempts to identify response to clarifying the different classifications of risk sources in the existing literature of developing countries, and to identify the future research directions on project risks in the area of construction in developing countries.

  5. Hemodynamic simulations in coronary aneurysms of children with Kawasaki disease

    NASA Astrophysics Data System (ADS)

    Sengupta, Dibyendu; Burns, Jane; Marsden, Alison

    2009-11-01

    Kawasaki disease (KD) is a serious pediatric illness affecting the cardiovascular system. One of the most serious complications of KD, occurring in about 25% of untreated cases, is the formation of large aneurysms in the coronary arteries, which put patients at risk for myocardial infarction. In this project we performed patient specific computational simulations of blood flow in aneurysmal left and right coronary arteries of a KD patient to gain an understanding about their hemodynamics. Models were constructed from CT data using custom software. Typical pulsatile flow waveforms were applied at the model inlets, while resistance and RCR lumped models were applied and compared at the outlets. Simulated pressure waveforms compared well with typical physiologic data. High wall shear stress values are found in the narrow region at the base of the aneurysm and low shear values occur in regions of recirculation. A Lagrangian approach has been adopted to perform particle tracking and compute particle residence time in the recirculation. Our long-term goal will be to develop links between hemodynamics and the risk for thrombus formation in order to assist in clinical decision-making.

  6. Case Study on Project Risk Management Planning Based on Soft System Methodology

    NASA Astrophysics Data System (ADS)

    Lifang, Xie; Jun, Li

    This paper analyzed the soft system characters of construction projects and the applicability on using Soft System Methodology (SSM) for risk analysis after a brief review of SSM. Taking a hydropower project as an example, it constructed the general frame of project risk management planning (PRMP) and established the Risk Management Planning (RMP) system from the perspective of the interests of co-ordination. This paper provided the ideas and methods for construction RMP under the win-win situation through the practice of SSM.

  7. Analysis of administrative barriers in the industry of the high-rise construction in Russian Federation

    NASA Astrophysics Data System (ADS)

    Zaychenko, Irina; Borremans, Alexandra; Gutman, Svetlana

    2018-03-01

    The article describes the concept and types of administrative barriers encountered in various areas of the enterprise. The particularities of the Russian high-rise construction industry are described and a comparative analysis of administrative barriers in this sector is performed. The main stages and administrative procedures when the developers implement investment and construction projects in the field of high-rise construction are determined. The regulatory and legal framework for the implementation of investment and project activities in the high-rise construction industry has been studied and conclusions have been drawn on its low level of precision in the issue of the formation of competitive and efficient high-rise construction markets. The average number of administrative procedures for the implementation of the investment and construction project in the field of high-rise construction is determined. The factors preventing the reduction of administrative barriers in the high-rise construction industry are revealed.

  8. How Can Lean Construction Improve the Daily Schedule of A Construction Manager?

    NASA Astrophysics Data System (ADS)

    Binninger, Marco; Dlouhy, Janosch; Schneider, Johannes; Haghsheno, Shervin

    2017-10-01

    The outcome of construction projects highly depends on effective management. The site manager is responsible for the site, and has a key role in executing construction projects. Especially this position has a wide range of tasks and a high volume of workload, which has to be carried out in a high pressure and high stress environment. Chaotic construction processes often create these working conditions. Lean Construction can help to organize the construction site in a better way and automatically supports the site manager.

  9. Evaluation of an Interdisciplinary Studio Experience To Teach Architecture and Construction Science Students the Design-build Project Delivery Method.

    ERIC Educational Resources Information Center

    Graham, Charles W.; Geva, Anat

    2001-01-01

    An interdisciplinary studio project involved architecture and construction students. Evaluation of the integrated studio experience found that it gave students an accurate picture of professional practice. Architecture students were made more aware of building materials, construction technology, and cost; construction science students better…

  10. 42 CFR 137.291 - May Self-Governance Tribes carry out construction projects without assuming these Federal...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May Self-Governance Tribes carry out construction... OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Nepa Process § 137.291 May Self-Governance Tribes carry out construction projects without assuming these Federal environmental...

  11. 77 FR 42696 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-20

    ... construction awards, 30 requests for amendments to non-construction awards, 2 project service maps). Average Hours Per Response: 2 hours for an amendment to a construction award, 1 hour for an amendment to a non-construction award, 6 hours for a project service map. Burden Hours: 1,242. Needs and Uses: A recipient must...

  12. 24 CFR 92.206 - Eligible project costs.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Eligible project costs. 92.206....206 Eligible project costs. HOME funds may be used to pay the following eligible costs: (a... following: (1) For new construction projects, costs to meet the new construction standards in § 92.251; (2...

  13. Long-term behavior of integral abutment bridges : appendix A, construction plans.

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment (IA) construction has become the preferred method over conventional construction for use with typical highway bridges. However, the use of these structures is limited due to state mandated length and skew limitations. To expand thei...

  14. Technical Handbook for Facilities Engineering and Construction Manual, Part 2: Federally Assisted Activities. Guide for Project Applicants-Construction Management Services. Department Technical Handbook Series.

    ERIC Educational Resources Information Center

    Department of Health , Education, and Welfare, Washington., DC. Office of the Secretary.

    This handbook provides a basis for consideration of acceptable approaches which are available and may be used to initiate the use of construction management services in the planning, design, and construction of federally assisted construction projects. It includes the mandatory federal requirements as well as acceptable procedures for selecting…

  15. 46 CFR 298.21 - Limits.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...

  16. 46 CFR 298.21 - Limits.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...

  17. 46 CFR 298.21 - Limits.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... customarily be capitalized as Vessel or Shipyard Project construction costs such as designing, engineering...) Cost items include those items usually specified in Vessel or Shipyard Project construction contracts... fees and interest on the Obligations or other borrowings incurred during the construction period...

  18. Streamlined project closeout for construction at KYTC.

    DOT National Transportation Integrated Search

    2017-09-01

    Project closeout is the period between the end of construction and when a contract is finalized. During closeout, resources are held in encumbered funds intended for the project and in the contractors bonding capacity. Although the Kentucky Transp...

  19. 24 CFR 884.122 - Separate project requirement.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... separate ACC List and ACC Part I and shall be assigned a separate project number. All new construction... construction projects where: (1) The units are placed under ACC on the same date; and (2) Such consolidation is...

  20. 24 CFR 884.122 - Separate project requirement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... separate ACC List and ACC Part I and shall be assigned a separate project number. All new construction... construction projects where: (1) The units are placed under ACC on the same date; and (2) Such consolidation is...

  1. Defense Infrastructure: Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency Operations

    DTIC Science & Technology

    2016-09-01

    unneeded to support U.S. forces in the CENTCOM area of responsibility and in future contingencies worldwide. View GAO-16-406. For more information...DEFENSE INFRASTRUCTURE Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency ...Actions Needed to Enhance Oversight of Construction Projects Supporting Military Contingency Operations Why GAO Did This Study For about 15 years, DOD

  2. 42 CFR 137.351 - Is a Self-Governance Tribe required to submit construction project progress and financial reports...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Is a Self-Governance Tribe required to submit construction project progress and financial reports for construction project agreements? 137.351 Section 137.351 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  3. 42 CFR 137.351 - Is a Self-Governance Tribe required to submit construction project progress and financial reports...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Is a Self-Governance Tribe required to submit construction project progress and financial reports for construction project agreements? 137.351 Section 137.351 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  4. 42 CFR 137.351 - Is a Self-Governance Tribe required to submit construction project progress and financial reports...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Is a Self-Governance Tribe required to submit construction project progress and financial reports for construction project agreements? 137.351 Section 137.351 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES...

  5. Informal worker phenomenon in housing construction project

    NASA Astrophysics Data System (ADS)

    Wijayaningtyas, Maranatha; Sipan, Ibrahim; Lukiyanto, Kukuh

    2017-11-01

    The informal workers phenomenon on housing construction projects in Indonesia is different from workers in other sectors who would always request as permanent employees. Substantively, the informal workers are disinclined to be bound as permanent employees which different from the general labor paradigm. Hence, the objective of this study is to find out how the labour selection process, the factors that affected their performance, and the suitable wage system to achieve the target completion of housing construction project. The qualitative method is used to uncover and understand the meaning behind the phenomena (numina) of informal workers action and their influence on housing construction project which called phenomenological approach. Five informal workers and two project managers were selected as informants based on predetermined criteria with in-depth interviews. The results showed that the informal worker were more satisfied with the wage based on unit price while working in the housing construction project for the flexibility in working hours. In addition, the developer was also relieved because they only control the quality and the achievement of the project completion time which supported by informal worker leader. Therefore, these findings are beneficial for both of developer and government as policy maker to succeed the housing program in Indonesia.

  6. The application of micro UAV in construction project

    NASA Astrophysics Data System (ADS)

    Kaamin, Masiri; Razali, Siti Nooraiin Mohd; Ahmad, Nor Farah Atiqah; Bukari, Saifullizan Mohd; Ngadiman, Norhayati; Kadir, Aslila Abd; Hamid, Nor Baizura

    2017-10-01

    In every outstanding construction project, there is definitely have an effective construction management. Construction management allows a construction project to be implemented according to plan. Every construction project must have a progress development works that is usually created by the site engineer. Documenting the progress of works is one of the requirements in construction management. In a progress report it is necessarily have a visual image as an evidence. The conventional method used for photographing on the construction site is by using common digital camera which is has few setback comparing to Micro Unmanned Aerial Vehicles (UAV). Besides, site engineer always have a current issues involving limitation of monitoring on high reach point and entire view of the construction site. The purpose of this paper is to provide a concise review of Micro UAV technology in monitoring the progress on construction site through visualization approach. The aims of this study are to replace the conventional method of photographing on construction site using Micro UAV which can portray the whole view of the building, especially on high reach point and allows to produce better images, videos and 3D model and also facilitating site engineer to monitor works in progress. The Micro UAV was flown around the building construction according to the Ground Control Points (GCPs) to capture images and record videos. The images taken from Micro UAV have been processed generate 3D model and were analysed to visualize the building construction as well as monitoring the construction progress work and provides immediate reliable data for project estimation. It has been proven that by using Micro UAV, a better images and videos can give a better overview of the construction site and monitor any defects on high reach point building structures. Not to be forgotten, with Micro UAV the construction site progress is more efficiently tracked and kept on the schedule.

  7. Time Overrun in Construction Project

    NASA Astrophysics Data System (ADS)

    Othman, I.; Shafiq, Nasir; Nuruddin, M. F.

    2017-12-01

    Timely completion is the key criteria to achieve success in any project despite the industry. Unfortunately construction industry in Malaysia has been labelled as industry facing poor performance leading to failure in achieving effective time management. As the consequence most of the project face huge amount of time overrun. This study assesses the causes of construction projects time overrun in Malaysia using structured questionnaire survey. Each respondent is asked to assign a one-to-five rating for each of the 18 time factors identified from literature review. Out of the 50 questionnaires sent out, 33 were received back representing 68% of the response rate. Data received from the questionnaires were analysed and processed using the descriptive statistics procedures. Findings from the study revealed that design and documentation issues, project management and contract administration, ineffective project planning and scheduling, contractor’s site management, financial resource management were the major factors that cause the time overrun. This study is hoped to help the practitioners to implement the mitigation measure at planning stage in order to achieve successful construction projects.

  8. Project Management Life Cycle Models to Improve Management in High-rise Construction

    NASA Astrophysics Data System (ADS)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  9. 42 CFR 124.1 - Applicability.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... FACILITY CONSTRUCTION AND MODERNIZATION Project Grants for Public Medical Facility Construction and... of the Public Health Service Act for construction and modernization projects designed to: (a) Eliminate or prevent imminent safety hazards as defined by Federal, State or local fire, building, or life...

  10. 48 CFR 836.602-2 - Evaluation boards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Management projects. The Director, Office of Construction and Facilities Management, shall appoint an... appropriate for the particular project. The Director, Office of Construction and Facilities Management may... Evaluation boards. (a) The Director, Office of Construction and Facilities Management, shall appoint an...

  11. Develop an asset management tool for collecting and tracking commitments on selected environmental mitigation features.

    DOT National Transportation Integrated Search

    2009-05-01

    Wisconsin has constructed many environmental mitigation projects in conjunction with transportation projects that have been implemented according : to the National Environmental Policy Act. Other mitigation projects have been constructed pursuant to ...

  12. In-Space Assembly and Construction Technology Project Summary: Infrastructure Operations Area of the Operations Technology Program

    NASA Technical Reports Server (NTRS)

    Bush, Harold

    1991-01-01

    Viewgraphs describing the in-space assembly and construction technology project of the infrastructure operations area of the operation technology program are presented. Th objective of the project is to develop and demonstrate an in-space assembly and construction capability for large and/or massive spacecraft. The in-space assembly and construction technology program will support the need to build, in orbit, the full range of spacecraft required for the missions to and from planet Earth, including: earth-orbiting platforms, lunar transfer vehicles, and Mars transfer vehicles.

  13. Building information modelling (BIM) after ten years: Malaysian construction players’ perception of BIM

    NASA Astrophysics Data System (ADS)

    Latiffi, A. Ahmad; Brahim, J.; Fathi, M. S.

    2017-08-01

    Building Information Modelling (BIM) concept has expanded widely in many countries for more than a decade with its role of improving current practices in construction projects. However, the understanding of BIM differs among construction players, depending on how construction players utilize the concept in their projects. Therefore, this paper aims to explore the understanding of BIM concept among construction players in the Malaysian construction industry. A literature review on BIM concept and semi-structured interviews with construction players in BIM such as client, civil and structural (C&S) engineer and mechanical and electrical (M&E) engineer, quantity surveyor (QS), contractor, facilities manager and BIM consultant have been conducted in order to achieve this study’s the aim. The results show that the understanding of BIM concept among the construction players is limited to BIM as a process and technology. It is important for the construction players to improve their understanding of BIM as it can be used to enhance performance and productivity of construction projects.

  14. 41 CFR 102-80.75 - Who assesses environmental issues in Federal construction and lease construction projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 41 Public Contracts and Property Management 3 2010-07-01 2010-07-01 false Who assesses environmental issues in Federal construction and lease construction projects? 102-80.75 Section 102-80.75 Public Contracts and Property Management Federal Property Management Regulations System (Continued) FEDERAL MANAGEMENT REGULATION REAL PROPERTY 80-SAFETY...

  15. Prevailing Wage Rates: The Effects on School Construction Costs, Levels of Taxation, and State Reimbursements.

    ERIC Educational Resources Information Center

    Keller, Edward C.; Hartman, William T.

    2001-01-01

    Results of study of impact of Pennsylvania Prevailing Wage Act on 25 school-construction project costs from 1992-97 and effect thereof on local school districts' taxes. All districts had higher construction costs and property taxes. Projects increased construction costs for the Commonwealth and recommends revisions in prevailing wage-rate law.…

  16. 40 CFR 40.145-3 - Projects involving construction.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... FEDERAL ASSISTANCE RESEARCH AND DEMONSTRATION GRANTS § 40.145-3 Projects involving construction. Research... have a fee simple or such other estate or interest in the site of the project, and rights of access, as... the project. (b) Invitations for bids or requests for proposals shall be based upon a clear and...

  17. 40 CFR 40.145-3 - Projects involving construction.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... FEDERAL ASSISTANCE RESEARCH AND DEMONSTRATION GRANTS § 40.145-3 Projects involving construction. Research... have a fee simple or such other estate or interest in the site of the project, and rights of access, as... the project. (b) Invitations for bids or requests for proposals shall be based upon a clear and...

  18. Management and integration of engineering and construction activities: Lessons learned from the AP1000{sup R} nuclear power plant China project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCullough, M. C.; Ebeling-Koning, D.; Evans, M. C.

    2012-07-01

    The lessons learned during the early phase of design engineering and construction activities for the AP1000 China Project can be applied to any project involving multiple disciplines and multiple organizations. Implementation of a first-of-a-kind design to directly support construction activities utilizing resources assigned to design development and design delivery creates challenges with prioritization of activities, successful closure of issues, and communication between site organizations and the home office. To ensure successful implementation, teams were assigned and developed to directly support construction activities including prioritization of activities, site communication and ensuring closure of site emergent issues. By developing these teams, themore » organization is better suited to meet the demands of the construction schedule while continuing with design evolution of a standard plant and engineering delivery for multiple projects. For a successful project, proper resource utilization and prioritization are key for overcoming obstacles and ensuring success of the engineering organization. (authors)« less

  19. Distinction of Concept and Discussion on Construction Idea of Smart Water Grid Project

    NASA Astrophysics Data System (ADS)

    Ye, Y.; Yizi, S., Sr.; Lili, L., Sr.; Sang, X.; Zhai, J.

    2016-12-01

    Smart water grid project includes construction of water physical grid consisting of various flow regulating infrastructures, construction of water information grid in line with the trend of intelligent technology and construction of water management grid featured by system & mechanism construction and systemization of regulation decision-making. It is the integrated platform and comprehensive carrier for water conservancy practices. Currently, there still is dispute over engineering construction idea of smart water grid which, however, represents the future development trend of water management and is increasingly emphasized. The paper, based on distinction of concept of water grid and water grid engineering, explains the concept of water grid intelligentization, actively probes into construction idea of Smart water grid project in our country and presents scientific problems to be solved as well as core technologies to be mastered for smart water grid construction.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tande, Brian; Seames, Wayne; Benson, Steve

    The objective of this project was to evaluate the use of composite polymer membranes and porous membrane contactors to regenerate physical and chemical solvents for capture of carbon dioxide (CO 2) from synthesis gas or flue gas, with the goal of improving the energy efficiency of carbon capture. Both a chemical solvent (typical for a post-combustion capture of CO 2 from flue gas) and a physical solvent (typical for pre- combustion capture of CO 2 from syngas) were evaluated using two bench-scale test systems constructed for this project. For chemical solvents, polytetrafluoroethylene and polypropylene membranes were found to be ablemore » to strip CO 2 from a monoethanolamine (MEA) solution with high selectivity without significant degradation of the material. As expected, the regeneration temperature was the most significant parameter affecting the CO 2 flux through the membrane. Pore size was also found to be important, as pores larger than 5 microns lead to excessive pore wetting. For physical solvents, polydimethyl-siloxane (PDMS)-based membranes were found to have a higher CO 2 permeability than polyvinylalcohol (PVOH) based membranes, while also minimizing solvent loss. Overall, however, the recovery of CO 2 in these systems is low – less than 2% for both chemical and physical solvents – primarily due to the small surface area of the membrane test apparatus. To obtain the higher regeneration rates needed for this application, a much larger surface area would be needed. Further experiments using, for example, a hollow fiber membrane module could determine if this process could be commercially viable.« less

  1. Development of high-rise buildings: digitalization of life cycle management

    NASA Astrophysics Data System (ADS)

    Gusakova, Elena

    2018-03-01

    The analysis of the accumulated long-term experience in the construction and operation of high-rise buildings reveals not only the engineering specificity of such projects, but also systemic problems in the field of project management. Most of the project decisions are made by the developer and the investor in the early stages of the life cycle - from the acquisition of the site to the start of operation, so most of the participants in the construction and operation of the high-rise building are far from the strategic life-cycle management of the project. The solution of these tasks due to the informatization of management has largely exhausted its efficiency resource. This is due to the fact that the applied IT-systems automated traditional "inherited" processes and management structures, and, in addition, they were focused on informatization of the activities of the construction company, rather than the construction project. Therefore, in the development of high-rise buildings, the tasks of researching approaches and methods for managing the full life cycle of projects that will improve their competitiveness become topical. For this purpose, the article substantiates the most promising approaches and methods of informational modeling of high-rise construction as a basis for managing the full life cycle of this project. Reengineering of information interaction schemes for project participants is considered; formation of a unified digital environment for the life cycle of the project; the development of systems for integrating data management and project management.

  2. 42 CFR 137.325 - What does a Self-Governance Tribe do if it wants to perform a construction project under section...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false What does a Self-Governance Tribe do if it wants to..., DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Project Assumption Process § 137.325 What does a Self-Governance Tribe do if it wants to perform a construction project under section...

  3. The effects of stream channelization on bottom dwelling organisms : phase 2 report : 1975 construction season.

    DOT National Transportation Integrated Search

    1976-01-01

    Three construction projects affecting streams are being monitored. On two of the projects, those affecting Meadow Run and Moores Creek, the streams are being monitored for flow, suspended solids, rainfall, and benthic populations. Construction has be...

  4. Space Science in Project SMART: A UNH High School Outreach Program

    NASA Astrophysics Data System (ADS)

    Smith, C. W.; Broad, L.; Goelzer, S.; Lessard, M.; Levergood, R.; Lugaz, N.; Moebius, E.; Schwadron, N.; Torbert, R. B.; Zhang, J.; Bloser, P. F.

    2016-12-01

    Every summer for the past 25 years the University of New Hampshire (UNH) has run a month-long, residential outreach program for high school students considering careers in mathematics, science, or engineering. Space science is one of the modules. Students work directly with UNH faculty performing original work with real spacecraft data and hardware and present the results of that effort at the end of the program. Recent research topics have included interplanetary waves and turbulence as recorded by the ACE and Voyager spacecraft, electromagnetic ion cyclotron (EMIC) waves seen by the RBSP spacecraft, interplanetary coronal mass ejections (ICME) acceleration and interstellar pickup ions as seen by the STEREO spacecraft, and prototyping CubeSat hardware. Student research efforts can provide useful results for future research efforts by the faculty while the students gain unique exposure to space physics and a science career. In addition, the students complete a team project. Since 2006, that project has been the construction and flight of a high-altitude balloon payload and instruments. The students typically build the instruments they fly. In the process, students learn circuit design and construction, microcontroller programming, and core atmospheric and space science. Our payload design has evolved significantly since the first flight of a simple rectangular box and now involves a stable descent vehicle that does not require a parachute, an on-board flight control computer, in-flight autonomous control and data acquisition of multiple student-built instruments, and real-time camera images sent to ground. This is a program that can be used as a model for other schools to follow and that high schools can initiate. More information can be found at .

  5. SEM-PLS Analysis of Inhibiting Factors of Cost Performance for Large Construction Projects in Malaysia: Perspective of Clients and Consultants

    PubMed Central

    Memon, Aftab Hameed; Rahman, Ismail Abdul

    2014-01-01

    This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R 2 value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun. PMID:24693227

  6. SEM-PLS analysis of inhibiting factors of cost performance for large construction projects in Malaysia: perspective of clients and consultants.

    PubMed

    Memon, Aftab Hameed; Rahman, Ismail Abdul

    2014-01-01

    This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire forms were distributed. Only 144 completed sets were received and analysed using advanced multivariate statistical software of Structural Equation Modelling (SmartPLS v2). The analysis involved three iteration processes where several of the factors were deleted in order to make the model acceptable. The result of the analysis found that R(2) value of the model is 0.422 which indicates that the developed model has a substantial impact on cost performance. Based on the final form of the model, contractor's site management category is the most prominent in exhibiting effect on cost performance of large construction projects. This finding is validated using advanced techniques of power analysis. This vigorous multivariate analysis has explicitly found the significant category which consists of several causative factors to poor cost performance in large construction projects. This will benefit all parties involved in construction projects for controlling cost overrun.

  7. A web-based Decision Support System for the optimal management of construction and demolition waste.

    PubMed

    Banias, G; Achillas, Ch; Vlachokostas, Ch; Moussiopoulos, N; Papaioannou, I

    2011-12-01

    Wastes from construction activities constitute nowadays the largest by quantity fraction of solid wastes in urban areas. In addition, it is widely accepted that the particular waste stream contains hazardous materials, such as insulating materials, plastic frames of doors, windows, etc. Their uncontrolled disposal result to long-term pollution costs, resource overuse and wasted energy. Within the framework of the DEWAM project, a web-based Decision Support System (DSS) application - namely DeconRCM - has been developed, aiming towards the identification of the optimal construction and demolition waste (CDW) management strategy that minimises end-of-life costs and maximises the recovery of salvaged building materials. This paper addresses both technical and functional structure of the developed web-based application. The web-based DSS provides an accurate estimation of the generated CDW quantities of twenty-one different waste streams (e.g. concrete, bricks, glass, etc.) for four different types of buildings (residential, office, commercial and industrial). With the use of mathematical programming, the DeconRCM provides also the user with the optimal end-of-life management alternative, taking into consideration both economic and environmental criteria. The DSS's capabilities are illustrated through a real world case study of a typical five floor apartment building in Thessaloniki, Greece. Copyright © 2011 Elsevier Ltd. All rights reserved.

  8. 75 FR 13765 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-23

    ... a project labor agreement (PLA), as they may decide appropriate, on large-scale construction... efficiency in Federal procurement. A PLA is a pre-hire collective bargaining agreement with one or more labor...

  9. Assessing performance characteristics of sediment basins constructed in Franklin County.

    DOT National Transportation Integrated Search

    2012-08-01

    The objective of the research project was to monitor the performance of newly designed : sediment basins that were constructed on the ALDOT 502 project in Franklin County. The : project included four tasks: (1) assess performance characteristics of s...

  10. On-site monitoring of construction of Terror Lake hydroelectric project, Kodiak, Alaska. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hosking, H.

    The report describes the effort by the Fish and Wildlife Service to monitor the construction of the first hydroelectric project built on national wildlife refuge lands under license by the Federal Energy Regulatory Commission. Recommendations are offered for use in planning other projects. Fish and wildlife species of concern included brown bears, Sitka black-tailed deer, mountain goats, raptors (including bald eagles), and several species of salmonid fish. Construction practices relating to erosion control, contaminant management, culvert placement, and siting of project structures are covered.

  11. Improvements Needed in Managing Scope Changes and Oversight of Construction Projects at Camp Lemonnier, Djibouti

    DTIC Science & Technology

    2016-09-30

    Improvements Needed in Managing Scope Changes and Oversight of Construction Projects at Camp Lemonnier, Djibouti S E P T E M B E R 3 0 , 2 0 1 6 Report...Improvements Needed in Managing Scope Changes and Oversight of Construction Projects at Camp Lemonnier, Djibouti Visit us at www.dodig.mil Objective We...Findings (cont’d) ii │ DODIG-2016-141 (Project No. D2014-D000RE-0157.000) Results in Brief Improvements Needed in Managing Scope Changes and Oversight

  12. Space construction activities

    NASA Technical Reports Server (NTRS)

    1991-01-01

    The Center for Space Construction at the University of Colorado at Boulder was established in 1988 as a University Space Engineering Research Center. The mission of the Center is to conduct interdisciplinary engineering research which is critical to the construction of future space structures and systems and to educate students who will have the vision and technical skills to successfully lead future space construction activities. The research activities are currently organized around two central projects: Orbital Construction and Lunar Construction. Summaries of the research projects are included.

  13. Construction Project Management for RED HORSE Troop Training Projects

    DTIC Science & Technology

    1989-02-02

    estimating, scheduling, and cost control required for project management decision making in RED HORSE construction projects. The expected benefits of...After receiving tentative approval for a project, either the benefiting base engineering section or the appropriate RED HORSE squadron executes the...approved by the benefiting base commander and forwarded to RED HORSE for review. Once the design has started, the benefiting base reports to Headquarters

  14. Mold-Resistant Construction.

    ERIC Educational Resources Information Center

    Huckabee, Christopher

    2003-01-01

    Asserts that one of the surest ways to prevent indoor air quality and mold issues is to use preventive construction materials, discussing typical resistance to dealing with mold problems (usually budget-related) and describing mold-resistant construction, which uses concrete masonry, brick, and stone and is intended to withstand inevitable…

  15. Concrete Masonry Designs: Educational Issue.

    ERIC Educational Resources Information Center

    Hertzberg, Randi, Ed.

    2001-01-01

    This special journal issue addresses concrete masonry in educational facilities construction. The issue's feature articles are: (1) "It Takes a Village To Construct a Massachusetts Middle School," describing a middle school constructed almost entirely of concrete masonry and modeled after a typical small New England village; (2)…

  16. DYNAMIC PROJECT COLLABORATION TOOLS FOR UNEXPLODED ORDNANCE (UXO) REMOVAL Case Study: Jefferson Proving Ground UXO Removal Projector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daffron, James Y.

    2003-02-27

    Unexploded Ordnance (UXO) removal and investigation projects typically involve multiple organizations including Government entities, private contractors, and technical experts. Resources are split into functional ''teams'' who perform the work and interface with the clients. The projects typically generate large amounts of data that must be shared among the project team members, the clients, and the public. The ability to efficiently communicate and control information is essential to project success. Web-based project collaboration is an effective management and communication tool when applied to ordnance and explosives (OE) projects. During a recent UXO/OE removal project at the Jefferson Proving Ground (JPG) inmore » Madison, IN, American Technologies, Inc. (ATI) successfully used the Project Commander(reg sign) (www.ProCommander.com) project collaboration website as a dynamic project and information management tool.« less

  17. Using numerical simulations to study the ICM metallicity fields in clusters and groups

    NASA Astrophysics Data System (ADS)

    Mazzei, Renato; Vijayaraghavan, Rukmani; Sarazin, Craig L.

    2018-01-01

    Most baryonic matter in clusters resides in the intracluster medium (ICM) as hot and diffuse gas. The metal content of this gas is deposited from dying stars, typically synthesized in type Ia or core-collapse supernovae. The ICM gas traces the formation history of the cluster and the compositional signature of its constituent galaxies as a function of time. Studying the metallicity content thus aids in understanding the gradual evolution of the cluster as it is constructed. Within this framework, galaxy and star formation and evolution can be studied by tracing metals in the ICM. In this work we use numerical simulations to study the evolution of ICM metallicity due to the stripping of galaxies’ gas. We model metallicity fields using cloud-in-cell techniques, to determine the ratio between the mass of particles tracing galaxy outflows and the mass of ICM gas at different spatial locations in each simulation time step. Integrated abundance maps are produced. We then project photons and construct mock X-ray images to investigate the relationship between ICM metallicity and observable information.

  18. Assessing problem-solving skills in construction education with the virtual construction simulator

    NASA Astrophysics Data System (ADS)

    Castronovo, Fadi

    The ability to solve complex problems is an essential skill that a construction and project manager must possess when entering the architectural, engineering, and construction industry. Such ability requires a mixture of problem-solving skills, ranging from lower to higher order thinking skills, composed of cognitive and metacognitive processes. These skills include the ability to develop and evaluate construction plans and manage the execution of such plans. However, in a typical construction program, introducing students to such complex problems can be a challenge, and most commonly the learner is presented with only part of a complex problem. To support this challenge, the traditional methodology of delivering design, engineering, and construction instruction has been going through a technological revolution, due to the rise of computer-based technology. For example, in construction classrooms, and other disciplines, simulations and educational games are being utilized to support the development of problem-solving skills. Previous engineering education research has illustrated the high potential that simulations and educational games have in engaging in lower and higher order thinking skills. Such research illustrated their capacity to support the development of problem-solving skills. This research presents evidence supporting the theory that educational simulation games can help with the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems. The educational simulation game employed in this study is the Virtual Construction Simulator (VCS). The VCS is a game developed to provide students in an engaging learning activity that simulates the planning and managing phases of a construction project. Assessment of the third iteration of the VCS(3) game has shown pedagogical value in promoting students' motivation and a basic understanding of construction concepts. To further evaluate the benefits on problem-solving skills, a new version of the VCS(4) was developed, with new building modules and assessment framework. The design and development of the VCS4 leveraged research in educational psychology, multimedia learning, human-computer interaction, and Building Information Modeling. In this dissertation the researcher aimed to evaluate the pedagogical value of the VCS4 in fostering problem-solving skills. To answer the research questions, a crossover repeated measures quasi-experiment was designed to assess the educational gains that the VCS can provide to construction education. A group of 34 students, attending a fourth-year construction course at a university in the United States was chosen to participate in the experiment. The three learning modules of the VCS were used, which challenged the students to plan and manage the construction process of a wooden pavilion, the steel erection of a dormitory, and the concrete placement of the same dormitory. Based on the results the researcher was able to provide evidence supporting the hypothesis that the chosen sample of construction students were able to gain and retain problem-solving skills necessary to solve complex construction simulation problems, no matter what the sequence with which these modules were played. In conclusion, the presented results provide evidence supporting the theory that educational simulation games can help the learning and retention of transferable problem-solving skills, which are necessary to solve complex construction problems.

  19. Ultra-High-Performance Concrete And Advanced Manufacturing Methods For Modular Construction

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sawab, Jamshaid; Lim, Ing; Mo, Yi-Lung

    Small modular reactors (SMR) allow for less onsite construction, increase nuclear material security, and provide a flexible and cost-effective energy alternative. SMR can be factory-built as modular components, and shipped to desired locations for fast assembly. This project successfully developed a new class of ultra-high performance concrete (UHPC), which features a compressive strength greater than 22 ksi (150 MPa) without special treatment and self-consolidating characteristics desired for SMR modular construction. With an ultra-high strength and dense microstructure, it will facilitate rapid construction of steel plate-concrete (SC) beams and walls with thinner and lighter modules, and can withstand harsh environments andmore » mechanical loads anticipated during the service life of nuclear power plants. In addition, the self-consolidating characteristics are crucial for the fast construction and assembly of SC modules with reduced labor costs and improved quality. Following the UHPC material development, the capacity of producing self-consolidating UHPC in mass quantities was investigated and compared to accepted self-consolidating concrete standards. With slightly adjusted mixing procedure using large-scale gravity-based mixers (compared with small-scale force-based mixer), the self-consolidating UHPC has been successfully processed at six cubic yards; the product met both minimum compressive strength requirements and self-consolidating concrete standards. Steel plate-UHPC beams (15 ft. long, 12 in. wide and 16 in. deep) and wall panels (40 in. X 40 in. X 3 in.) were then constructed using the self-consolidating UHPC without any external vibration. Quality control guidelines for producing UHPC in large scale were developed. When the concrete is replaced by UHPC in a steel plate concrete (SC) beam, it is critical to evaluate its structural behavior with both flexure and shear-governed failure modes. In recent years, SC has been widely used for buildings and nuclear containment structures to resist lateral forces induced by severe earthquakes and heavy winds. SC modules have good potential for SMR because of their cost-effectiveness and reduced construction time. However, the minimum shear reinforcement (i.e. cross tie) ratio needs to be determined for the steel plate-UHPC (S-UHPC) beams to exhibit a ductile failure mode. In this project, S-UHPC beams were designed and constructed. The beams were tested to evaluate structural capacity and identify the minimum cross ties ratios. In addition, as the bond between UHPC and steel plate is essential for ensuring structural integrity under shear and flexure, it was measured and examined in this project through digital image correlation system and smart piezoelectric aggregate sensors. Large-scale testing and finite element simulation were also performed on S-UHPC wall panels. New bond slip-based constitutive models of steel plate were developed for S-UHPC, which were used in finite element analysis program to predict S-UHPC behavior under shear. The results were well validated through experimental data. The long-term durability of UHPC were established in this project. UHPC specimens were tested under free shrinkage, restrained shrinkage, elevated temperature, water permeation, chloride diffusion, corrosion, and alkali silica reaction. UHPC has demonstrated significantly improved durability compared with control concrete specimens. This research led to a new generation of steel plate-UHPC modules for SMR that can provide large benefits to the electric power industry. Taking advantage of the high strength and durability of UHPC, their modularity and ease of assembly can address the high cost barriers of typical nuclear power plants.« less

  20. 40 CFR 35.2036 - Design/build project grants.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...

  1. 40 CFR 35.2036 - Design/build project grants.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...

  2. 40 CFR 35.2036 - Design/build project grants.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and performing construction management and contract administration, will be in accordance with EPA..., responsible bid; (ii) A lump sum for construction management, contract and project administration services and... ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2036 Design/build...

  3. The Physician Values in Practice Scale: Construction and Initial Validation

    ERIC Educational Resources Information Center

    Hartung, Paul J.; Taber, Brian J.; Richard, George V.

    2005-01-01

    Measures of values typically appraise the construct globally, across life domains or relative to a broad life domain such as work. We conducted two studies to construct and initially validate an occupation- and context-specific values measure. Study 1, based on a sample of 192 medical students, describes the initial construction and item analysis…

  4. Accelerated Innovation Deployment (AID) Demonstration : KYTC—Roundabout Installation Project in London, Kentucky.

    DOT National Transportation Integrated Search

    2017-11-01

    This document serves as the final report on the construction and opening of the Roundabout Project in London, Kentucky (Kentucky Item Number 11904.1). This project (hereafter referred to as the London Roundabout) was constructed on the authority o...

  5. Cost Control

    ERIC Educational Resources Information Center

    Kennedy, Mike

    2009-01-01

    When Fayette County (Kentucky) school officials began putting together estimates for upcoming renovation projects at two elementary schools, they based their projections on their district construction projects from 2007. But by February, when construction bids were opened for the renovations of Cassidy and Russell Cave elementary schools, the…

  6. Long-term performance of a hot in-place recycling project final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This report documents the construction and long-term performance of a hot in-place recycled (HIPR) : project on SR 542. HIPR project selection, mix design, construction and testing are described. It was shown that : the HIPR process successfully reha...

  7. Analysis of Construction Quality Assurance Procedures on Federally Funded Local Public Agency Projects

    DOT National Transportation Integrated Search

    2016-07-01

    Approximately 20 percent of the Federal-aid highway program is invested in local public agency (LPA) infrastructure projects, which is a significant portion of total Federal funds allocated to highway construction projects in the United States. In re...

  8. Constructions for Children: Projects in Design Technology.

    ERIC Educational Resources Information Center

    Eichelberger, Barbara; Larson, Connie

    This book helps children develop the capability and confidence to design, construct, and evaluate working models. Projects in this book are suitable for students in grades K-4, but may be adapted for older students. Step-by-step explanations for each project are meant as guidelines and completion of the project is not limited to a single correct…

  9. Applying Project Histories and Project Learning through Knowledge Management in an Australian Construction Company

    ERIC Educational Resources Information Center

    Maqsood, Tayyab; Finegan, Andrew; Walker, Derek

    2006-01-01

    Purpose: With the advent of information and communication technologies (ICT), some organisations have endeavoured to develop and maintain systems commonly known as project histories. This paper aims to provide a framework to the construction organisations in order to improve the learning from projects through the development and use of project…

  10. 78 FR 18348 - Submission for OMB Review; Use of Project Labor Agreements for Federal Construction Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... agreement (PLA), as they may decide appropriate, on large-scale construction projects, where the total cost... procurement. A PLA is a pre-hire collective bargaining agreement with one or more labor organizations that... the use of a project labor agreement (PLA), as they may decide appropriate, on large-scale...

  11. Reinforce Design and Construction Issues with a Comprehensive Laboratory Project.

    ERIC Educational Resources Information Center

    Schemmel, John J.

    In 1996, a comprehensive project was introduced in the first course of Reinforced Concrete Design, CVEG 4303 at the University of Arkansas. The primary purpose of this project was to highlight issues related to the construction of reinforced concrete elements. This semester-long project involves the design, fabrication, and testing of 8-foot long…

  12. Research on Risk Manage of Power Construction Project Based on Bayesian Network

    NASA Astrophysics Data System (ADS)

    Jia, Zhengyuan; Fan, Zhou; Li, Yong

    With China's changing economic structure and increasingly fierce competition in the market, the uncertainty and risk factors in the projects of electric power construction are increasingly complex, the projects will face huge risks or even fail if we don't consider or ignore these risk factors. Therefore, risk management in the projects of electric power construction plays an important role. The paper emphatically elaborated the influence of cost risk in electric power projects through study overall risk management and the behavior of individual in risk management, and introduced the Bayesian network to the project risk management. The paper obtained the order of key factors according to both scene analysis and causal analysis for effective risk management.

  13. Weighted Iterative Bayesian Compressive Sensing (WIBCS) for High Dimensional Polynomial Surrogate Construction

    NASA Astrophysics Data System (ADS)

    Sargsyan, K.; Ricciuto, D. M.; Safta, C.; Debusschere, B.; Najm, H. N.; Thornton, P. E.

    2016-12-01

    Surrogate construction has become a routine procedure when facing computationally intensive studies requiring multiple evaluations of complex models. In particular, surrogate models, otherwise called emulators or response surfaces, replace complex models in uncertainty quantification (UQ) studies, including uncertainty propagation (forward UQ) and parameter estimation (inverse UQ). Further, surrogates based on Polynomial Chaos (PC) expansions are especially convenient for forward UQ and global sensitivity analysis, also known as variance-based decomposition. However, the PC surrogate construction strongly suffers from the curse of dimensionality. With a large number of input parameters, the number of model simulations required for accurate surrogate construction is prohibitively large. Relatedly, non-adaptive PC expansions typically include infeasibly large number of basis terms far exceeding the number of available model evaluations. We develop Weighted Iterative Bayesian Compressive Sensing (WIBCS) algorithm for adaptive basis growth and PC surrogate construction leading to a sparse, high-dimensional PC surrogate with a very few model evaluations. The surrogate is then readily employed for global sensitivity analysis leading to further dimensionality reduction. Besides numerical tests, we demonstrate the construction on the example of Accelerated Climate Model for Energy (ACME) Land Model for several output QoIs at nearly 100 FLUXNET sites covering multiple plant functional types and climates, varying 65 input parameters over broad ranges of possible values. This work is supported by the U.S. Department of Energy, Office of Science, Biological and Environmental Research, Accelerated Climate Modeling for Energy (ACME) project. Sandia National Laboratories is a multi-program laboratory managed and operated by Sandia Corporation, a wholly owned subsidiary of Lockheed Martin Corporation, for the U.S. Department of Energy's National Nuclear Security Administration under contract DE-AC04-94AL85000.

  14. Construction project selection with the use of fuzzy preference relation

    NASA Astrophysics Data System (ADS)

    Ibadov, Nabi

    2016-06-01

    In the article, author describes the problem of the construction project variant selection during pre-investment phase. As a solution, the algorithm basing on fuzzy preference relation is presented. The article provides an example of the algorithm used for selection of the best variant for construction project. The choice is made basing on criteria such as: net present value (NPV), level of technological difficulty, financing possibilities, and level of organizational difficulty.

  15. Problems of increased transport load as a result of implementation of projects of high-rise constructions

    NASA Astrophysics Data System (ADS)

    Provotorov, Ivan; Gasilov, Valentin; Anisimova, Nadezhda

    2018-03-01

    The structure of problems of high-rise construction us suggested, which includes the impact on environment, design solutions, transportation problems, financial costs for construction and operation, and others. Positive and negative aspects of high-rise construction are considered. One of the basic problems of high-rise construction is the problem of increased transport load. Construction of the subway on the basis of the concession mechanism, with the use of unmanned control of rolling stock is proposed as the most expedient solution. An evaluation of the effectiveness of this project is presented, it shows quite high performance indicators for a private investor. Main problems that the project implementation may face in conditions of lack of scientific and methodological support are outlined.

  16. Investigation on the Factors Influencing Construction Time and Cost Overrun for High-Rise Building Projects In Penang

    NASA Astrophysics Data System (ADS)

    Nor Haslinda, A.; Xian, T. Wei; Norfarahayu, K.; Muhamad Hanafi, R.; Fikri, H. Muhammad

    2018-04-01

    Time and cost overruns have become one prominent issue for most construction projects around the world. Project costing and timeframe extension had been causing a lot of wastage and loss of opportunity for many parties involved. Therefore, this research was carried out to investigate the factors influencing time and cost overruns for high-rise construction projects in Penang, Malaysia. A set of questionnaires survey was distributed to the project managers who had been or currently involved in the high-rise building projects in Penang to get their input and perceptions for each factor identified as well as its frequency of occurrence. In order to rank all the factors gathered, the mean index of the most distinguishing factors and its frequency of occurrence were multiplied to get the severity index. The results revealed that for time overrun, the most predominant causes were due to design changes, inadequate planning and scheduling and poor labor productivity. Meanwhile, the predominant causes of cost overrun were poor pre-construction budget and material cost planning, inaccurate quantity take-off and materials cost increased by inflation. The significance of establishing the issues related to time and cost overruns for the high-rise building construction project is to provide a greater insight and understanding on the causes of delays, particularly among the main project players: contractors, client, and consultants.

  17. Projecting Labor Requirements for Transportation-Related Construction. Final Report.

    ERIC Educational Resources Information Center

    Washington Technical Inst., Washington, DC. Center for Urban Services.

    This report examines the urban transportation planning process and its labor market impact, including projections of opportunities for minority participation in construction, operation, and maintenance of a transportation system and forecasts of training needed in critical occupations. It was found that transportation-related construction may be…

  18. 23 CFR 230.117 - Reimbursement procedures (Federal-aid highway construction projects only).

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Reimbursement procedures (Federal-aid highway construction projects only). 230.117 Section 230.117 Highways FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF... Construction Contracts (Including Supportive Services) § 230.117 Reimbursement procedures (Federal-aid highway...

  19. Defense Infrastructure: DOD Needs Clearer Guidance on Notifying Congress of Privately Financed Construction Projects

    DTIC Science & Technology

    2017-01-01

    fast food restaurants . Because these projects are not authorized and funded through the regular appropriations process for military construction...750,000 threshold for major projects. 5We selected this sample by identifying one project of each type—commissary; exchange; morale, welfare, and...of 212 possible projects. Further details of our selection process are found in appendix I. Page 3 GAO-17-76 Nonappropriated Fund

  20. 50 CFR 253.11 - Guarantee policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., except: (1) Vessel construction. The Program will not finance this project cost. The Program will only refinance this project cost for an existing vessel whose previous construction cost has already been financed (or otherwise paid). Refinancing this project cost for a vessel that already exists is not...

  1. 76 FR 22631 - Community Facility Loans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... restrictive language in 7 CFR part 1942 that limits projects using alternate construction methods to loans... field staff and applicants understand when a project qualifies as an alternate construction method. None... contracting method projects must comply with the requirements for ``maximum open and free competition'' in...

  2. Research and Practice of Uav Remote Sensing in the Monitoring and Management of Construction Projects in Riparian Areas

    NASA Astrophysics Data System (ADS)

    Yu, J.; Gan, Z.; Zhong, L.; Deng, L.

    2018-04-01

    The objective of this paper is to investigate the use of UAV remote sensing in the monitoring and management of construction projects in riparian areas through the case study of embankment construction projects' monitoring in the Three Gorges Reservoir area. A three-step approach is proposed to address the problem: data acquisition with UAV, data processing, and monitoring information extraction. The results of the case study demonstrate that UAV remote sensing is capable of providing fast and accurate measurements and calculations for the needs of monitoring of riparian constructions.

  3. Advocating mindset for cooperative partnership for better future of construction industry

    NASA Astrophysics Data System (ADS)

    Omar, Datuk Wahid

    2017-11-01

    Construction industry players are known for their low acceptance on the changes. Hence, it is identified that the biggest challenge in the industry is changing the mindset. This paper highlights the importance of transformation in shaping for better future of the industry. Transformation favors innovation and progressive development in the industry and specifically in managing a project. Thus changes in mindset of players with an eye to the future and focus on what is coming are paramount in inculcating the transformation culture in construction eco-system. The key to the success of transformation is the collaborative and cooperative partnering which ensuring the performance of every stage of project delivery. The collaborative, cooperative and concerted effort of all parties involved in the project creates mutual understanding on mission and vision of project. Adopting healthy and harmonious project culture, implementing innovative procurement that emphasis on fair risk sharing should be a working culture. This cooperative partnership should be the future of the project undertaking in the construction industry.

  4. World Bank oil-pipeline project designed to prevent HIV transmission.

    PubMed

    Kigotho, A W

    1997-11-29

    A World Bank-funded oil pipeline project, in Chad and Cameroon, is the first large-scale construction project in sub-Saharan Africa to incorporate an HIV/AIDS prevention component. The project entails the development of oil fields in southern Chad and construction of 1100 km of pipeline to port facilities on Cameroon's Atlantic coast. 3000 construction workers from the two countries will be employed between 1998 and 2001, including about 600 truck drivers. In some areas along the pipeline route, 50% of the prostitutes (who are frequented by truck drivers) are HIV-infected. The HIV/AIDS intervention aims to prevent HIV and sexually transmitted diseases (STDs) among project workers through social marketing of condoms, treatment of STDs in prostitutes along the route, and health education to modify high-risk behaviors. The program is considered a test case for African governments and donors interested in whether the integration of a health component in major construction projects can avoid AIDS epidemics in affected countries.

  5. The Projection of Space Radiation Environments with a Solar Cycle Statistical Model

    NASA Technical Reports Server (NTRS)

    Kim, Myung-Hee; Cucinotta, Francis A.; Wilson, John W.

    2006-01-01

    A solar cycle statistical model has been developed to project sunspot numbers which represent the variations in the space radiation environment. The resultant projection of sunspot numbers in near future were coupled to space-related quantities of interest in radiation protection, such as the galactic cosmic radiation (GCR) deceleration potential (f) and the mean occurrence frequency of solar particle event (SPE). Future GCR fluxes have been derived from a predictive model, in which GCR temporal dependence represented by f was derived from GCR flux and ground-based Climax neutron monitor rate measurements over the last four decades. Results showed that the point dose equivalent inside a typical spacecraft in interplanetary radiation fields was influenced by solar modulation up to a factor of three. One important characteristic of sporadic SPEs is their mean frequency of occurrence, which is dependent on solar activity. Projections of future mean frequency of SPE occurrence were estimated from a power law function of sunspot number. Furthermore, the cumulative probabilities of SPE during short-period missions were defined with the continuous database of proton fluences of SPE. The analytic representation of energy spectra of SPE was constructed by the Weibull distribution for different event sizes. The representative exposure level at each event size was estimated for the guideline of protection systems for astronauts during future space exploration missions.

  6. Innovations in the Analysis of Chandra-ACIS Observations

    NASA Astrophysics Data System (ADS)

    Broos, Patrick S.; Townsley, Leisa K.; Feigelson, Eric D.; Getman, Konstantin V.; Bauer, Franz E.; Garmire, Gordon P.

    2010-05-01

    As members of the instrument team for the Advanced CCD Imaging Spectrometer (ACIS) on NASA's Chandra X-ray Observatory and as Chandra General Observers, we have developed a wide variety of data analysis methods that we believe are useful to the Chandra community, and have constructed a significant body of publicly available software (the ACIS Extract package) addressing important ACIS data and science analysis tasks. This paper seeks to describe these data analysis methods for two purposes: to document the data analysis work performed in our own science projects and to help other ACIS observers judge whether these methods may be useful in their own projects (regardless of what tools and procedures they choose to implement those methods). The ACIS data analysis recommendations we offer here address much of the workflow in a typical ACIS project, including data preparation, point source detection via both wavelet decomposition and image reconstruction, masking point sources, identification of diffuse structures, event extraction for both point and diffuse sources, merging extractions from multiple observations, nonparametric broadband photometry, analysis of low-count spectra, and automation of these tasks. Many of the innovations presented here arise from several, often interwoven, complications that are found in many Chandra projects: large numbers of point sources (hundreds to several thousand), faint point sources, misaligned multiple observations of an astronomical field, point source crowding, and scientifically relevant diffuse emission.

  7. Nuclear Mass Predictions within the Skyrme HFB Theory

    NASA Astrophysics Data System (ADS)

    Samyn, M.; Goriely, S.; Pearson, J. M.

    2005-05-01

    To increase the reliability of predictions of highly neutron-rich nuclear masses we systematically analyze the sensitivity of Hartree-Fock-Bogoliubov (HFB) mass formulae to various physical inputs, such as a density dependence of the pairing interaction, a low effective mass, the particle-number projection, the symmetry energy, … We typically use a 10-parameter Skyrme force and a 4-parameter δ-function pairing force. The 14 degrees of freedom are adjusted to the masses of all measured nuclei with N,Z ⩾ 8 given in the 2001 and 2003 Audi et al. compilations. The masses of light and proton-rich nuclei are corrected by a 4-parameter phenomenological Wigner term. With more than ten such parameter sets complete mass tables are constructed, going from one drip line to the other, up to Z = 120.

  8. Resilient and Corrosion-Proof Rolling Element Bearings Made from Superelastic Ni-Ti Alloys for Aerospace

    NASA Technical Reports Server (NTRS)

    Dellacorte, Christopher

    2014-01-01

    Mechanical components (bearings, gears, mechanisms) typically utilize hardened construction materials to minimize wear and attain long life. In such components, loaded contact points (e.g., meshing gear teeth, bearing balls-raceway contacts) experience high contact stresses. The combination of high hardness and high elastic modulus often leads to damaging contact stress and denting, particularly during transient overload events such as shock impacts that occur during the launching of space vehicles or the landing of aircraft. In this webinar, Dr. DellaCorte will introduce the results of a research project that employs a superelastic alloy, Ni-Ti for rolling element bearing applications. Bearings and components made from such alloys can alleviate many problems encountered in advanced aerospace applications and may solve many terrestrial applications as well

  9. Experiments in mixed reality

    NASA Astrophysics Data System (ADS)

    Krum, David M.; Sadek, Ramy; Kohli, Luv; Olson, Logan; Bolas, Mark

    2010-01-01

    As part of the Institute for Creative Technologies and the School of Cinematic Arts at the University of Southern California, the Mixed Reality lab develops technologies and techniques for presenting realistic immersive training experiences. Such experiences typically place users within a complex ecology of social actors, physical objects, and collections of intents, motivations, relationships, and other psychological constructs. Currently, it remains infeasible to completely synthesize the interactivity and sensory signatures of such ecologies. For this reason, the lab advocates mixed reality methods for training and conducts experiments exploring such methods. Currently, the lab focuses on understanding and exploiting the elasticity of human perception with respect to representational differences between real and virtual environments. This paper presents an overview of three projects: techniques for redirected walking, displays for the representation of virtual humans, and audio processing to increase stress.

  10. TechEdSat Nano-Satellite Series Fact Sheet

    NASA Technical Reports Server (NTRS)

    Murbach, Marcus; Martinez, Andres; Guarneros Luna, Ali

    2014-01-01

    TechEdSat-3p is the second generation in the TechEdSat-X series. The TechEdSat Series uses the CubeSat standards established by the California Polytechnic State University Cal Poly), San Luis Obispo. With typical blocks being constructed from 1-unit (1U 10x10x10 cm) increments, the TechEdSat-3p has a 3U volume with a 30 cm length. The project uniquely pairs advanced university students with NASA researchers in a rapid design-to-flight experience lasting 1-2 semesters.The TechEdSat Nano-Satellite Series provides a rapid platform for testing technologies for future NASA Earth and planetary missions, as well as providing students with an early exposure to flight hardware development and management.

  11. Managing large energy and mineral resources (EMR) projects in challenging environments

    NASA Astrophysics Data System (ADS)

    Chanmeka, Arpamart

    The viability of energy mineral resources (EMR) construction projects is contingent upon the state of the world economic climate. Oil sands projects in Alberta, Canada exemplify large EMR projects that are highly sensitive to fluctuations in the world market. Alberta EMR projects are constrained by high fixed production costs and are also widely recognized as one of the most challenging construction projects to successfully deliver due to impacts from extreme weather conditions, remote locations and issues with labor availability amongst others. As indicated in many studies, these hardships strain the industry's ability to execute work efficiently, resulting in declining productivity and mounting cost and schedule overruns. Therefore, to enhance the competitiveness of Alberta EMR projects, project teams are targeting effective management strategies to enhance project performance and productivity by countering the uniquely challenging environment in Alberta. The main purpose of this research is to develop industry wide benchmarking tailored to the specific constraints and challenges of Alberta. Results support quantitative assessments and identify the root causes of project performance and ineffective field productivity problems in the heavy industry sector capital projects. Customized metrics produced from the data collected through a web-based survey instrument were used to quantitatively assess project performance in the following dimensions: cost, schedule, change, rework, safety, engineering and construction productivity and construction practices. The system enables the industry to measure project performance more accurately, get meaningful comparisons, while establishing credible norms specific to Alberta projects. Data analysis to identify the root cause of performance problems was conducted. The analysis of Alberta projects substantiated lessons of previous studies to create an improved awareness of the abilities of Alberta-based companies to manage their unique projects. This investigation also compared Alberta-based projects with U.S. projects to point out the differences in project process and management strategies under different environments. The relative impact of factors affecting construction productivity were identified and validated by the input from industry experts. The findings help improve the work processes used by companies developing projects in Alberta.

  12. 20th Annual Residence Hall Construction Report

    ERIC Educational Resources Information Center

    Agron, Joe

    2009-01-01

    Even in difficult economic times, colleges and universities continue to invest in residence hall construction projects as a way to attract new students and keep existing ones on campus. According to data from "American School & University"'s 20th annual Residence Hall Construction Report, the median new project completed in 2008 was…

  13. Interdisciplinary Approach to Building Construction.

    ERIC Educational Resources Information Center

    Armstrong, Harry

    The paper discusses the interdisciplinary approach used by the Amity High School House Construction Project to develop a construction cluster in a small high school, to give students on-the-job training, and to teach them the relevancy of academic education. The project's monthly plan of action is briefly described. Suggested activities,…

  14. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...

  15. 7 CFR Appendix D to Subpart E of... - Alcohol Production Facilities Planning, Performing, Development and Project Control

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... imposed by construction, equipment, material or service contracts, penalty payments, damage claims, awards... consultants with suitable experience, training and professional competence in the design and construction of... engineering services for design and construction inspection for all project facilities. Resident inspection by...

  16. The Effect of School Building Renovation/Construction on School Culture

    ERIC Educational Resources Information Center

    Lesisko, Lee J.; Wright, Robert J.; O'Hern, Brenda

    2010-01-01

    School construction or renovation projects can have a profound affect on students, faculty and administration. The literature revealed that continuous communication is essential for a smooth process. This research identified bureaucratic issues and school climate to be leading factors of concern during construction projects. Analysis of this study…

  17. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kerrigan, Philip

    2012-09-01

    Building Science Corporation has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI, which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  18. Whole-House Design and Commissioning in the Project Home Again Hot-Humid New Construction Community

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kerrigan, P.

    2012-09-01

    BSC has been working with Project Home Again since 2008 and has consulted on the design of around 100 affordable, energy efficient new construction homes for victims of hurricanes Katrina and Rita. This report details the effort on the final two phases of the project: Phases V and VI which resulted in a total of 25 homes constructed in 2011. The goal of this project was to develop and implement an energy efficiency package that will achieve at least 20% whole house source energy savings improvement over the B10 Benchmark.

  19. On the delay factors of the private construction projects in Medan city

    NASA Astrophysics Data System (ADS)

    Perwira Mulia Tarigan, A.; Subroto

    2018-03-01

    The delay in construction projects undertaken by contractors is impeding the economic growth of a region. Medan city which is one of the big cities in Indonesia is suffering from it. This study aims to identify the dominant factors causing delays in construction projects conducted by private contractors. The interview method with questionnaires is used to involve 20 contractors, 10 consultants, and 10 owner representatives in the study. From the 45 identified factors causing delays, the highest ranking is the change of work demand by the project owners with 71.84% importance index.

  20. Critical success factors in infrastructure projects

    NASA Astrophysics Data System (ADS)

    Zakaria, Siti Fairus; Zin, Rosli Mohamad; Mohamad, Ismail; Balubaid, Saeed; Mydin, Shaik Hussein; Mohd Rahim, E. M. Roodienyanto

    2017-11-01

    Construction of infrastructure project is different from buildings. The main difference is term of project site where infrastructure project need to command a long stretch while building mostly confine to a limited area. As such factors that are critical to infrastructure project may not be that significant to building project and vice versa. Flood mitigation can be classified under infrastructure projects under which their developments are planned by the government with the specific objective to reduce or avoid the negative effects of flood to the environment and livelihood. One of the indicators in project success is delay. The impact of project delay in construction industry is significant that it decelerates the projects implementation, specifically the government projects. This study attempted to identify and compare the success factors between infrastructure and building projects, as such comparison rarely found in the current literature. A model of flood mitigation projects' success factors was developed by merging the experts' views and reports from the existing literature. The experts' views were obtained from the responses to open-ended questions on the required fundamentals to achieve successful completion of flood mitigation projects. An affinity analysis was applied to these responses to develop the model. The developed model was then compared to the established success factors found in building project, extracted from the previous studies to identify the similarities and differences between the two models. This study would assist the government and construction players to become more effective in constructing successful flood mitigation projects for the future practice in a flood-prone country like Malaysia.

  1. 78 FR 23586 - Final Environmental Impact Statement, Habitat Conservation Plan, and Implementing Agreement and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ...) from construction, operation, maintenance, and decommissioning associated with the Buckeye Wind Power... construction, operation, maintenance, and decommissioning of the project. The project consists of a 100-turbine... Draft Programmatic Agreement, Buckeye Wind Power Project, Champaign County, Ohio AGENCY: Fish and...

  2. The Pros and Cons of Contractor Financed Approach to School Construction.

    ERIC Educational Resources Information Center

    Chan, T. C.

    1983-01-01

    Lists the advantages and disadvantages to school districts of having contractors take part in financing a school construction project when a school district has reached its full limit of borrowing capacity and necessary projected cash flow in order to complete the project. (MLF)

  3. 7 CFR 1753.80 - Minor construction procedure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... same calendar year is limited to the following amounts for the following discrete categories of minor...) A single minor construction project may be a discrete element of a somewhat larger overall project... placement project. It cannot be a portion, by dividing into smaller segments, of a discrete major...

  4. Field trial of gravel stabilization methods : Route 1, Cyr-Van Buren, ME : 2nd interim report.

    DOT National Transportation Integrated Search

    1995-02-01

    This experimental construction project was developed, designed, and inspected by personnel from the University of Maine, Civil Engineering Staff. The experimental project was constructed on and as a part of Project #2586 00. This was a complete recon...

  5. Field trial of gravel stabilization methods : Route 1, Cyr-Van Buren, ME : 1st interim report.

    DOT National Transportation Integrated Search

    1993-05-01

    This experimental construction project was developed, designed, and inspected by personnel from the University of Maine, Civil Engineering Staff. The experimental project was constructed on and as a part of Project #2586.00. This was a complete recon...

  6. 46 CFR 160.040-3 - Materials, construction, workmanship, and performance requirements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Appliance, Impulse-Projected Rocket Type (and Equipment) § 160.040-3 Materials, construction, workmanship...-projected rocket type line-throwing appliances and equipment shall be of good quality suitable for the... operation aboard vessels at sea. (c) Workmanship. Impulse-projected rocket type line-throwing appliances...

  7. 46 CFR 160.040-3 - Materials, construction, workmanship, and performance requirements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Appliance, Impulse-Projected Rocket Type (and Equipment) § 160.040-3 Materials, construction, workmanship...-projected rocket type line-throwing appliances and equipment shall be of good quality suitable for the... operation aboard vessels at sea. (c) Workmanship. Impulse-projected rocket type line-throwing appliances...

  8. 46 CFR 160.040-3 - Materials, construction, workmanship, and performance requirements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Appliance, Impulse-Projected Rocket Type (and Equipment) § 160.040-3 Materials, construction, workmanship...-projected rocket type line-throwing appliances and equipment shall be of good quality suitable for the... operation aboard vessels at sea. (c) Workmanship. Impulse-projected rocket type line-throwing appliances...

  9. 46 CFR 160.040-3 - Materials, construction, workmanship, and performance requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Appliance, Impulse-Projected Rocket Type (and Equipment) § 160.040-3 Materials, construction, workmanship...-projected rocket type line-throwing appliances and equipment shall be of good quality suitable for the... operation aboard vessels at sea. (c) Workmanship. Impulse-projected rocket type line-throwing appliances...

  10. 46 CFR 160.040-3 - Materials, construction, workmanship, and performance requirements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Appliance, Impulse-Projected Rocket Type (and Equipment) § 160.040-3 Materials, construction, workmanship...-projected rocket type line-throwing appliances and equipment shall be of good quality suitable for the... operation aboard vessels at sea. (c) Workmanship. Impulse-projected rocket type line-throwing appliances...

  11. Cost estimation using ministerial regulation of public work no. 11/2013 in construction projects

    NASA Astrophysics Data System (ADS)

    Arumsari, Putri; Juliastuti; Khalifah Al'farisi, Muhammad

    2017-12-01

    One of the first tasks in starting a construction project is to estimate the total cost of building a project. In Indonesia there are several standards that are used to calculate the cost estimation of a project. One of the standards used in based on the Ministerial Regulation of Public Work No. 11/2013. However in a construction project, contractor often has their own cost estimation based on their own calculation. This research aimed to compare the construction project total cost using calculation based on the Ministerial Regulation of Public Work No. 11/2013 against the contractor’s calculation. Two projects were used as case study to compare the results. The projects were a 4 storey building located in Pantai Indah Kapuk area (West Jakarta) and a warehouse located in Sentul (West Java) which was built by 2 different contractors. The cost estimation from both contractors’ calculation were compared to the one based on the Ministerial Regulation of Public Work No. 11/2013. It is found that there were differences between the two calculation around 1.80 % - 3.03% in total cost, in which the cost estimation based on Ministerial Regulation was higher than the contractors’ calculations.

  12. Design and Implementation of Green Construction Scheme for a High-rise Residential Building Project

    NASA Astrophysics Data System (ADS)

    Zhou, Yong; Huang, You Zhen

    2018-06-01

    This paper mainly studies the green construction scheme of a high-rise residential building project. From "four sections one environmental protection", saving material, water saving, energy saving, economical use of land and environmental protection conduct analysis and research. Adopting scientific, advanced, reasonable and economical construction technology measures, implementing green construction method. Promoting energy-saving technologies in buildings, ensuring the sustainable use of resources, Maximum savings of resources and energy, increase energy efficiency, to reduce pollution, reducing the adverse environmental impact of construction activities, ensure construction safety, build sustainable buildings.

  13. An American Construction of European Education Space

    ERIC Educational Resources Information Center

    Silova, Iveta; Brehm, William C.

    2010-01-01

    The construction of the European education space has typically been attributed to European education policy makers, institutions, and networks. Rarely do scholars consider the role of outside, non-European actors in shaping the terrain of European education thought and practice. This article considers the construction of the European education…

  14. Project Delivery Methods.

    ERIC Educational Resources Information Center

    Dolan, Thomas G.

    2003-01-01

    Describes project delivery methods that are replacing the traditional Design/Bid/Build linear approach to the management, design, and construction of new facilities. These variations can enhance construction management and teamwork. (SLD)

  15. 23 CFR 650.201 - Purpose.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.201 Purpose..., abatement of water pollution, and prevention of damage by sediment deposition from all construction projects...

  16. 23 CFR 650.201 - Purpose.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.201 Purpose..., abatement of water pollution, and prevention of damage by sediment deposition from all construction projects...

  17. 23 CFR 650.201 - Purpose.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.201 Purpose..., abatement of water pollution, and prevention of damage by sediment deposition from all construction projects...

  18. 23 CFR 650.201 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.201 Purpose..., abatement of water pollution, and prevention of damage by sediment deposition from all construction projects...

  19. 23 CFR 650.201 - Purpose.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., STRUCTURES, AND HYDRAULICS Erosion and Sediment Control on Highway Construction Projects § 650.201 Purpose..., abatement of water pollution, and prevention of damage by sediment deposition from all construction projects...

  20. Course constructions: A case-base of forensic toxicology.

    PubMed

    Zhou, Nan; Wu, Yeda; Su, Terry; Zhang, Liyong; Yin, Kun; Zheng, Da; Zheng, Jingjing; Huang, Lei; Wu, Qiuping; Cheng, Jianding

    2017-08-01

    Forensic toxicology education in China is limited by insufficient teaching methods and resources, resulting in students with adequate theoretical principles but lacking practice experience. Typical cases used as teaching materials vividly represent intoxication and provide students with an opportunity to practice and hone resolving skills. In 2013, the Department of Forensic Pathology at Zhongshan School of Medicine began to construct top-quality courses in forensic toxicology, with its first step, creating a base containing typical cases of intoxication. This essay reviews the construction process of said cases-base, which is intended to set an example of forensic toxicology education. Copyright © 2017 Elsevier Ltd and Faculty of Forensic and Legal Medicine. All rights reserved.

  1. Research on Construction Technology of First Pile in an Urban Expressway under Complicated Conditions

    NASA Astrophysics Data System (ADS)

    Zhu, Zhi gang

    2017-12-01

    This paper develops a research method on the construction of the first pile in the process of the construction on an urban expressway under complicated conditions, such as the difference between the underground conditions and the exploration results,the sand formation,the whole weathered and the rich groundwater. We study the relevant technical parameters and construction organization through construction of the first pile. The results show that construction on the first pile is very important under complicated conditions and can provide a basis to continuously improve the level of the whole pile foundation construction technology, and ultimately determine the entire project feasible construction program and the successful completion of the construction project.

  2. Energy intensity, life-cycle greenhouse gas emissions, and economic assessment of liquid biofuel pipelines.

    PubMed

    Strogen, Bret; Horvath, Arpad; Zilberman, David

    2013-12-01

    Petroleum fuels are predominantly transported domestically by pipelines, whereas biofuels are almost exclusively transported by rail, barge, and truck. As biofuel production increases, new pipelines may become economically attractive. Location-specific variables impacting pipeline viability include construction costs, availability and costs of alternative transportation modes, electricity prices and emissions (if priced), throughput, and subsurface temperature. When transporting alcohol or diesel-like fuels, pipelines have a lower direct energy intensity than rail, barge, and trucks if fluid velocity is under 1 m/s for 4-inch diameter pipelines and 2 m/s for 8-inch or larger pipelines. Across multiple hypothetical state-specific scenarios, profit-maximizing design velocities range from 1.2 to 1.9 m/s. In costs and GHG emissions, optimized pipelines outperform trucks in each state and rail and barge in most states, if projected throughput exceeds four billion liters/year. If emissions are priced, optimum design diameters typically increase to reduce pumping energy demands, increasing the cost-effectiveness of pipeline projects. Copyright © 2013 Elsevier Ltd. All rights reserved.

  3. 75 FR 39561 - Administrative Guidelines; Subsidy Layering Reviews for Proposed Section 8 Project-Based Voucher...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-09

    ... review process. The operational support analysis will consider the debt coverage ratio (DCR) and the... performing subsidy layering reviews for project-based voucher HAP contracts for new construction and... construction and rehabilitated housing under the project-based voucher program where the applicable State or...

  4. 3 CFR 13502 - Executive Order 13502 of February 6, 2009. Use of Project Labor Agreements for Federal...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... developing by providing structure and stability to large-scale construction projects, thereby promoting the... procurement, producing labor-management stability, and ensuring compliance with laws and regulations governing... construction projects receiving Federal financial assistance, would help to promote the economical, efficient...

  5. Optimizing Value and Avoiding Problems in Building Schools.

    ERIC Educational Resources Information Center

    Brevard County School Board, Cocoa, FL.

    This report describes school design and construction delivery processes used by the School Board of Brevard County (Cocoa, Florida) that help optimize value, avoid problems, and eliminate the cost of maintaining a large facility staff. The project phases are examined from project definition through design to construction. Project delivery…

  6. 18 CFR 4.1 - Initial cost statement.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Initial cost statement...

  7. 18 CFR 4.1 - Initial cost statement.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Initial cost statement...

  8. 18 CFR 4.10 - Valuation data.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.10... Power Act that requires the determination of the fair value of a project already constructed, the... a statement to the effect that the actual legitimate original cost, or if not known, the estimated...

  9. 18 CFR 4.1 - Initial cost statement.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Initial cost statement...

  10. 18 CFR 4.1 - Initial cost statement.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.1 Initial cost statement. (a) Notification of Commission. When a project is constructed under a license issued under the... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Initial cost statement...

  11. 18 CFR 4.10 - Valuation data.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.10... Power Act that requires the determination of the fair value of a project already constructed, the... a statement to the effect that the actual legitimate original cost, or if not known, the estimated...

  12. 18 CFR 4.10 - Valuation data.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... PROJECT COSTS Determination of Fair Value of Constructed Projects, Under Section 23(a) of the Act § 4.10... Power Act that requires the determination of the fair value of a project already constructed, the... a statement to the effect that the actual legitimate original cost, or if not known, the estimated...

  13. 36 CFR 72.33 - Timing and duration of projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ..., Rehabilitation and Innovation § 72.33 Timing and duration of projects. (a) Construction components of projects... completing construction components of either Rehabilitation or Innovation proposals will be limited to three... Program, and of benefit to the federal government. Any component of an Innovation proposal which is to...

  14. 36 CFR 72.33 - Timing and duration of projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., Rehabilitation and Innovation § 72.33 Timing and duration of projects. (a) Construction components of projects... completing construction components of either Rehabilitation or Innovation proposals will be limited to three... Program, and of benefit to the federal government. Any component of an Innovation proposal which is to...

  15. 36 CFR 72.33 - Timing and duration of projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ..., Rehabilitation and Innovation § 72.33 Timing and duration of projects. (a) Construction components of projects... completing construction components of either Rehabilitation or Innovation proposals will be limited to three... Program, and of benefit to the federal government. Any component of an Innovation proposal which is to...

  16. 36 CFR 72.33 - Timing and duration of projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., Rehabilitation and Innovation § 72.33 Timing and duration of projects. (a) Construction components of projects... completing construction components of either Rehabilitation or Innovation proposals will be limited to three... Program, and of benefit to the federal government. Any component of an Innovation proposal which is to...

  17. 36 CFR 72.33 - Timing and duration of projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ..., Rehabilitation and Innovation § 72.33 Timing and duration of projects. (a) Construction components of projects... completing construction components of either Rehabilitation or Innovation proposals will be limited to three... Program, and of benefit to the federal government. Any component of an Innovation proposal which is to...

  18. 76 FR 19121 - Notice of Submission of Proposed Information Collection to OMB Multifamily Project Applications...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-06

    ... Proposed Information Collection to OMB Multifamily Project Applications and Construction Prior to Initial... facilities is also required as part of the application for firm commitment for mortgage insurance. Project owners/sponsors may apply for permission to commence construction prior to initial endorsement. DATES...

  19. Project-Based Learning and Student Knowledge Construction during Asynchronous Online Discussion

    ERIC Educational Resources Information Center

    Koh, Joyce Hwee Ling; Herring, Susan C.; Hew, Khe Foon

    2010-01-01

    Project-based learning engages students in problem solving through artefact design. However, previous studies of online project-based learning have focused primarily on the dynamics of online collaboration; students' knowledge construction throughout this process has not been examined thoroughly. This case study analyzed the relationship between…

  20. 32 CFR 644.4 - Reservoir projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... projects. 8.1Lands for reservoir construction and operation. 8.2Additional lands for correlative purposes... potentials of each reservoir. 8.1Lands for reservoir construction and operation. The fee title will be... 32 National Defense 4 2011-07-01 2011-07-01 false Reservoir projects. 644.4 Section 644.4 National...

  1. 32 CFR 644.4 - Reservoir Projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... projects. 8.1Lands for reservoir construction and operation. 8.2Additional lands for correlative purposes... potentials of each reservoir. 8.1Lands for reservoir construction and operation. The fee title will be... 32 National Defense 4 2010-07-01 2010-07-01 true Reservoir Projects. 644.4 Section 644.4 National...

  2. Annual Program: Library Services and Construction Act, 1987-1988.

    ERIC Educational Resources Information Center

    South Carolina State Library, Columbia.

    This report presents the 1978-1988 annual Library Services and Construction Act (LSCA) program for the South Carolina State Library. This program includes fiscal information and project descriptions for the following LCSA projects under Title I-Library Services: (1) Projects IA-General Administration; (2) IB-Library Interpretation; (3) IIA-General…

  3. 77 FR 38723 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-29

    ...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... effect throughout the duration of the construction and renewal of the Sellwood Bridge located on the... the construction area while transiting in the vicinity of the Sellwood Bridge project; however, the...

  4. 77 FR 14970 - Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ...-AA00 Safety Zones; Sellwood Bridge Project, Willamette River; Portland, OR AGENCY: Coast Guard, DHS... effect throughout the duration of the construction and renewal of the Sellwood Bridge on the Willamette... construction area while transiting in the vicinity of the Sellwood Bridge project; however, the establishment...

  5. 28 CFR 91.58 - Timing of the environmental review process.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... decisions or new commitments of resources can be made on these projects by the State or local entity that... specifications; or (5) Purchasing property. (e) Ongoing or completed construction projects. For grant-funded... been done, making every effort to limit disruption to projects under construction. For completed grant...

  6. Relational approach in managing construction project safety: a social capital perspective.

    PubMed

    Koh, Tas Yong; Rowlinson, Steve

    2012-09-01

    Existing initiatives in the management of construction project safety are largely based on normative compliance and error prevention, a risk management approach. Although advantageous, these approaches are not wholly successful in further lowering accident rates. A major limitation lies with the approaches' lack of emphasis on the social and team processes inherent in construction project settings. We advance the enquiry by invoking the concept of social capital and project organisational processes, and their impacts on project safety performance. Because social capital is a primordial concept and affects project participants' interactions, its impact on project safety performance is hypothesised to be indirect, i.e. the impact of social capital on safety performance is mediated by organisational processes in adaptation and cooperation. A questionnaire survey was conducted within Hong Kong construction industry to test the hypotheses. 376 usable responses were received and used for analyses. The results reveal that, while the structural dimension is not significant, the mediational thesis is generally supported with the cognitive and relational dimensions affecting project participants' adaptation and cooperation, and the latter two processes affect safety performance. However, the cognitive dimension also directly affects safety performance. The implications of these results for project safety management are discussed. Copyright © 2011 Elsevier Ltd. All rights reserved.

  7. Disparities in visuo-spatial constructive abilities in Williams syndrome patients with typical deletion on chromosome 7q11.23.

    PubMed

    Muramatsu, Yukako; Tokita, Yoshihito; Mizuno, Seiji; Nakamura, Miho

    2017-02-01

    Williams syndrome (WS) is known for its uneven cognitive abilities, especially the difficulty in visuo-spatial cognition, though there are some inter-individual phenotypic differences. It has been proposed that the difficulty in visuo-spatial cognition of WS patients can be attributed to a haploinsufficiency of some genes located on the deleted region in 7q11.23, based on an examination of atypical deletions identified in WS patients with atypical cognitive deficits. According to this hypothesis, the inter-individual differences in visuo-spatial cognitive ability arise from variations in deletion. We investigated whether there were inter-individual differences in the visuo-spatial constructive abilities of five unrelated WS patients with the typical deletion on chromosome 7q11.23 that includes the candidate genes contributing visuo-spatial difficulty in WS patients. We used tests with three-dimensional factors such as Benton's three-dimensional block construction test, which are considered to be more sensitive than those with only two-dimensional factors. There were diverse inter-individual differences in the visuo-spatial constructive abilities among the present participants who shared the same typical genomic deletion of WS. One of the participants showed almost equivalent performances to typically developing adults in those tests. In the present study, we found a wide range of cognitive abilities in visuo-spatial construction even among the patients with a common deletion pattern of WS. The findings suggest that attributing differences in the phenotypes entirely to genetic factors such as an atypical deletion may not be always correct. Copyright © 2016 The Japanese Society of Child Neurology. Published by Elsevier B.V. All rights reserved.

  8. Wood products used in constructing conservation and development projects by the Corps of Engineers in the United States, 1962 and 1978

    Treesearch

    W. H. Reid; D. B. McKeever

    Estimates of the amounts of wood products used in constructing civil conservation and development projects by the Corps of Engineers in the United States are presented for the years 1962 and 1978. Amounts of lumber, laminated lumber, poles and piling, and plywood used in construction are stratified by five construction categories, and three types of uses. Estimates of...

  9. AASHTOWare Preconstruction Preliminary Investigation

    DOT National Transportation Integrated Search

    2017-12-17

    The AKDOT&PF Northern Region construction section has successfully implemented AASHTOWare SiteManager on all construction projects. This project is to investigate and test the AASHTOWare Preconstruction module for statewide implementation. This proje...

  10. 23 CFR 772.19 - Construction noise.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... construction of the project. The identification is to be performed during the project development studies. (b... achieved and the overall adverse social, economic, and environmental effects and costs of the abatement...

  11. 23 CFR 772.19 - Construction noise.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... construction of the project. The identification is to be performed during the project development studies. (b... achieved and the overall adverse social, economic, and environmental effects and costs of the abatement...

  12. 23 CFR 772.19 - Construction noise.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... construction of the project. The identification is to be performed during the project development studies. (b... achieved and the overall adverse social, economic, and environmental effects and costs of the abatement...

  13. 49 CFR 1150.6 - Financial information.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) A present value determination of the full costs of the proposal. If construction is proposed, the... projected net income for 2 years, based upon traffic projections. Where construction is contemplated, the...

  14. 49 CFR 1150.6 - Financial information.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) A present value determination of the full costs of the proposal. If construction is proposed, the... projected net income for 2 years, based upon traffic projections. Where construction is contemplated, the...

  15. 49 CFR 1150.6 - Financial information.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) A present value determination of the full costs of the proposal. If construction is proposed, the... projected net income for 2 years, based upon traffic projections. Where construction is contemplated, the...

  16. 49 CFR 1150.6 - Financial information.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) A present value determination of the full costs of the proposal. If construction is proposed, the... projected net income for 2 years, based upon traffic projections. Where construction is contemplated, the...

  17. 49 CFR 1150.6 - Financial information.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) A present value determination of the full costs of the proposal. If construction is proposed, the... projected net income for 2 years, based upon traffic projections. Where construction is contemplated, the...

  18. 76 FR 67670 - Basin Electric Power Cooperative, Inc.: Notice of Intent To Prepare an Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ..., modifications to 4 existing substations, a 345-kV switchyard, maintenance access roads, temporary construction... will address the construction, operation, and maintenance of Basin Electric's proposed Project. The Project includes construction, operation and maintenance of approximately 190 miles of new 345-kV single...

  19. 13 CFR 125.2 - What are SBA's and the procuring agency's responsibilities when providing contracting assistance...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... justified); is for construction and seeks to package or consolidate discrete construction projects; or if a... alternatives may include: (A) Breaking up the procurement into smaller discrete procurements, especially construction acquisitions that can be procured as separate projects; (B) Breaking out one or more discrete...

  20. 42 CFR 137.368 - Is the Secretary responsible for oversight and compliance of health and safety codes during...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... compliance of health and safety codes during construction projects being performed by a Self-Governance Tribe... SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of the Secretary in Establishing and Implementing Construction Project Agreements § 137.368 Is the Secretary responsible for oversight and compliance of health...

  1. Misconceptions of a School Construction Project

    ERIC Educational Resources Information Center

    Rosenberg, David

    2004-01-01

    Just as technology has changed the way teachers teach and students learn, so too has technology transformed the way our industry manages school construction programs. Gone are the days when a school construction project had to be planned around the limitations of the contractor rather than the needs of students. Also different are the ways schools…

  2. Challenges in Construction Over Soft Soil - Case Studies in Malaysia

    NASA Astrophysics Data System (ADS)

    Mohamad, N. O.; Razali, C. E.; Hadi, A. A. A.; Som, P. P.; Eng, B. C.; Rusli, M. B.; Mohamad, F. R.

    2016-07-01

    Construction on soft ground area is a great challenge in the field of geotechnical engineering. Many engineering problems in the form of slope instability, bearing capacity failure or excessive settlement could occur either during or after the construction phase due to low shear strength and high compressibility of this soil. As main technical agencies responsible for implementation of development projects for Government of Malaysia, Public Works Department has vast experience in dealing with this problematic soil over the years. This paper discussed and elaborate on the engineering problems encountered in construction projects that have been carried out by PWD, namely Core Facilities Building of Polytechnic Kota Kinabalu in Sabah and Hospital Tengku Ampuan Rahimah Integration Quarters in Klang, Selangor. Instability of the ground during construction works had caused delay and cost overrun in completion of the project in Selangor, whereas occurrence of continuous post construction settlement had affected the integrity and serviceability of the building in Sabah. The causes of failure and proposed rehabilitation work for both projects also will be discussed in brief.

  3. Enhancing Knowledge Sharing Management Using BIM Technology in Construction

    PubMed Central

    Ho, Shih-Ping; Tserng, Hui-Ping

    2013-01-01

    Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology. PMID:24723790

  4. Enhancing knowledge sharing management using BIM technology in construction.

    PubMed

    Ho, Shih-Ping; Tserng, Hui-Ping; Jan, Shu-Hui

    2013-01-01

    Construction knowledge can be communicated and reused among project managers and jobsite engineers to alleviate problems on a construction jobsite and reduce the time and cost of solving problems related to constructability. This paper proposes a new methodology for the sharing of construction knowledge by using Building Information Modeling (BIM) technology. The main characteristics of BIM include illustrating 3D CAD-based presentations and keeping information in a digital format and facilitation of easy updating and transfer of information in the BIM environment. Using the BIM technology, project managers and engineers can gain knowledge related to BIM and obtain feedback provided by jobsite engineers for future reference. This study addresses the application of knowledge sharing management using BIM technology and proposes a BIM-based Knowledge Sharing Management (BIMKSM) system for project managers and engineers. The BIMKSM system is then applied in a selected case study of a construction project in Taiwan to demonstrate the effectiveness of sharing knowledge in the BIM environment. The results demonstrate that the BIMKSM system can be used as a visual BIM-based knowledge sharing management platform by utilizing the BIM technology.

  5. Working capital management in the process of financial support of investment and construction projects and of the construction material industry

    NASA Astrophysics Data System (ADS)

    Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay

    2018-03-01

    The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.

  6. High-rise construction as a method for architectural development of megapolises

    NASA Astrophysics Data System (ADS)

    Kankhva, Vadim

    2018-03-01

    The article analyzes the current state of urban development in Moscow, there are revealed the insights into pattern of large investment projects. The regulatory framework as well as the state and the forecast of housing funds are scrutinized. A number of problems, that are related to the implementation of high-rise construction projects at all stages of the life cycles, are highlighted by the example of unique facilities, which are under construction or have already been built. Substantiation of high-rise construction by the transport hubs in megapolises is given. There are also considered main advantages of Moscow renovation project and criticism against it.

  7. Lake Charles CCS Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Leib, Thomas; Cole, Dan

    In late September 2014 development of the Lake Charles Clean Energy (LCCE) Plant was abandoned resulting in termination of Lake Charles Carbon Capture and Sequestration (CCS) Project which was a subset the LCCE Plant. As a result, the project was only funded through Phase 2A (Design) and did not enter Phase 2B (Construction) or Phase 2C (Operations). This report was prepared relying on information prepared and provided by engineering companies which were engaged by Leucadia Energy, LLC to prepare or review Front End Engineering and Design (FEED) for the Lake Charles Clean Energy Project, which includes the Carbon Capture andmore » Sequestration (CCS) Project in Lake Charles, Louisiana. The Lake Charles Carbon Capture and Sequestration (CCS) Project was to be a large-scale industrial CCS project intended to demonstrate advanced technologies that capture and sequester carbon dioxide (CO 2) emissions from industrial sources into underground formations. The Scope of work was divided into two discrete sections; 1) Capture and Compression prepared by the Recipient Leucadia Energy, LLC, and 2) Transport and Sequestration prepared by sub-Recipient Denbury Onshore, LLC. Capture and Compression-The Lake Charles CCS Project Final Technical Report describes the systems and equipment that would be necessary to capture CO 2 generated in a large industrial gasification process and sequester the CO 2 into underground formations. The purpose of each system is defined along with a description of its equipment and operation. Criteria for selection of major equipment are provided and ancillary utilities necessary for safe and reliable operation in compliance with environmental regulations are described. Construction considerations are described including a general arrangement of the CCS process units within the overall gasification project. A cost estimate is provided, delineated by system area with cost breakdown showing equipment, piping and materials, construction labor, engineering, and other costs. The CCS Project Final Technical Report is based on a Front End Engineering and Design (FEED) study prepared by SK E&C, completed in [June] 2014. Subsequently, Fluor Enterprises completed a FEED validation study in mid-September 2014. The design analyses indicated that the FEED package was sufficient and as expected. However, Fluor considered the construction risk based on a stick-build approach to be unacceptable, but construction risk would be substantially mitigated through utilization of modular construction where site labor and schedule uncertainty is minimized. Fluor’s estimate of the overall EPC project cost utilizing the revised construction plan was comparable to SKE&C’s value after reflecting Fluor’s assessment of project scope and risk characteristic. Development was halted upon conclusion of Phase 2A FEED and the project was not constructed.Transport and Sequestration – The overall objective of the pipeline project was to construct a pipeline to transport captured CO 2 from the Lake Charles Clean Energy project to the existing Denbury Green Line and then to the Hastings Field in Southeast Texas to demonstrate effective geologic sequestration of captured CO 2 through commercial EOR operations. The overall objective of the MVA portion of the project was to demonstrate effective geologic sequestration of captured CO 2 through commercial Enhanced Oil Recovery (EOR) operations in order to evaluate costs, operational processes and technical performance. The DOE target for the project was to capture and implement a research MVA program to demonstrate the sequestration through EOR of approximately one million tons of CO 2 per year as an integral component of commercial operations.« less

  8. Constructing a Stereographic Projection Model

    ERIC Educational Resources Information Center

    Lovett, D. R.; King, G. D.

    1978-01-01

    Explains how to construct a three dimensional model for stereographic projection. It will be suitable for presenting the symmetry of crystal systems, and will help physics students understand the nature of crystallography. (GA)

  9. Cost of unintended pregnancy in Norway: a role for long-acting reversible contraception

    PubMed Central

    Henry, Nathaniel; Schlueter, Max; Lowin, Julia; Lekander, Ingrid; Filonenko, Anna; Trussell, James; Skjeldestad, Finn Egil

    2015-01-01

    Objectives The objective of this study was to quantify the cost burden of unintended pregnancies (UPs) in Norway, and to estimate the proportion of costs due to imperfect contraceptive adherence. Potential cost savings that could arise from increased uptake of long-acting reversible contraception (LARC) were also investigated. Methods An economic model was constructed to estimate the total number of UPs and associated costs in women aged 15–24 years. Adherence-related UP was estimated using ‘perfect use’ and ‘typical use’ contraceptive failure rates. Potential savings from increased use of LARC were projected by comparing current costs to projected costs following a 5% increase in LARC uptake. Results Total costs from UP in women aged 15–24 years were estimated to be 164 million Norwegian Kroner (NOK), of which 81.7% were projected to be due to imperfect contraceptive adherence. A 5% increase in LARC uptake was estimated to generate cost savings of NOK 7.2 million in this group. Conclusions The cost of UP in Norway is substantial, with a large proportion of this cost arising from imperfect contraceptive adherence. Increased LARC uptake may reduce the UP incidence and generate cost savings for both the health care payer and contraceptive user. PMID:25537792

  10. Van Quan new town in Hanoi and its socio-economic impacts on the four surrounding villages - towards a more sustainable urban development

    NASA Astrophysics Data System (ADS)

    Nguyen, Quang Minh; Doan, The Trung; Tran, Minh Tung; Nguyen, Manh Tri; Hoa Ta, Quynh

    2018-04-01

    Developed by Housing and Urban Development Corporation (HUD) over a decade ago as one of the pioneering and modelling urban housing projects in Hanoi, Van Quan new town can be regarded as a fairly successful scheme, because it provides people with a better living quality than most of the other new residential quarters planned and built at the same time, and even afterwards. However, the success would be greater, if the project developer paid due attention to some socio-economic aspects of mass housing construction - such as income, education, healthcare and social interaction as well as communication - in one of the city’s fastest-growing and most typical areas characterised with the presence of traditional old villages where a rich rural culture can still be found and should be conserved in the rapid urbanisation and modernisation. Van Quan makes an even more remarkable case study, because there are four villages connected to the site with both similar and different features, rather than the other new towns with only one or two villages nearby. The research results drawn and the lessons learnt from Van Quan will be useful for other projects, as far as a harmony and a sustainable development between the old and the new factors are concerned.

  11. Long-term behavior of integral abutment bridges.

    DOT National Transportation Integrated Search

    2011-01-01

    Integral abutment (IA) construction has become the preferred method over conventional construction for use with typical : highway bridges. However, the use of these structures is limited due to state mandated length and skew limitations. To : expand ...

  12. Performance Contracting and Energy Efficiency in the State Government Market

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bharvirkar, Ranjit; Goldman, Charles; Gilligan, Donald

    There is growing interest in energy efficiency (EE) among state policymakers as a result of increasing environmental concerns, rising electricity and natural gas prices, and lean economic times that motivate states to look more aggressively for cost-saving opportunities in public sector buildings. One logical place for state policymakers to demonstrate their commitment to energy efficiency is to 'lead by example' by developing and implementing strategies to reduce the energy consumption of state government facilities through investments in energy efficient technologies. Traditionally, energy efficiency improvements at state government facilities are viewed as a subset in the general category of building maintenancemore » and construction. These projects are typically funded through direct appropriations. However, energy efficiency projects are often delayed or reduced in scope whereby not all cost-effective measures are implemented because many states have tight capital budgets. Energy Savings Performance Contracting (ESPC) offers a potentially useful strategy for state program and facility managers to proactively finance and develop energy efficiency projects. In an ESPC project, Energy Service Companies (ESCOs) typically guarantee that the energy and cost savings produced by the project will equal or exceed all costs associated with implementing the project over the term of the contract. ESCOs typically provide turnkey design, installation, and maintenance services and also help arrange project financing. Between 1990 and 2006, U.S. ESCOs reported market activity of {approx}$28 Billion, with about {approx}75-80% of that activity concentrated in the institutional markets (K-12 schools, colleges/universities, state/local/federal government and hospitals). In this study, we review the magnitude of energy efficiency investment in state facilities and identify 'best practices' while employing performance contracting in the state government sector. The state government market is defined to include state offices, state universities, correctional facilities, and other state facilities. This study is part of a series of reports prepared by Lawrence Berkeley National Laboratory (LBNL) and the National Association of Energy Services Companies (NAESCO) on the ESCO market and industry trends. The scope of previous reports was much broader: Goldman et al. (2002) analyzed ESCO project costs and savings in public and private sector facilities, Hopper et al. (2005) focused on ESCO project activity in all public and institutional sectors, while Hopper et al (2007) provided aggregate results of a comprehensive survey of ESCOs on current industry activity and future prospects. We decided to focus the current study on ESCO and energy efficiency activity and potential market barriers in the state government market because previous studies suggested that this institutional sector has significant remaining energy efficiency opportunities. Moreover, ESCO activity in the state government market has lagged behind other institutional markets (e.g., K-12 schools, local governments, and the federal market). Our primary objectives were as follows: (1) Assess existing state agency energy information and data sources that could be utilized to develop performance metrics to assess progress among ESPC programs in states; (2) Conduct a comparative review of the performance of selected state ESPC programs in reducing energy usage and costs in state government buildings; and (3) Delineate the extent to which state government sector facilities are implementing energy efficiency projects apart from ESPC programs using other strategies (e.g. utility ratepayer-funded energy efficiency programs, loan funds).« less

  13. 14. Trestle 16, the trestle under Siphon 3, typical of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Trestle 16, the trestle under Siphon 3, typical of the tall trestle construction. View looks north. - Lake Hodges Flume, Along San Dieguito River between Lake Hodges & San Dieguito Reservoir, Rancho Santa Fe, San Diego County, CA

  14. 3D Modeling as Method for Construction and Analysis of Graphic Objects

    NASA Astrophysics Data System (ADS)

    Kheyfets, A. L.; Vasilieva, V. N.

    2017-11-01

    The use of 3D modeling when constructing and analyzing perspective projections and shadows is considered. The creation of photorealistic image is shown. The perspective of the construction project and characterization of its image are given as an example. The authors consider the construction of a dynamic block as a means of graphical information storage and automation of geometric constructions. The example of the dynamic block construction at creating a truss node is demonstrated. The constructions are considered as applied to the Auto-CAD software. The paper is aimed at improving the graphic methods of architectural design and improving the educational process when training the Bachelor’s degree students majoring in construction.

  15. 25 CFR 170.473 - What happens when a construction project ends?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian Reservation Roads Program Facilities... inspection, as well as contractors and maintenance personnel. (2) All project information must be made...

  16. Investigation on factors that contribute to the abandonment of building in construction industry in Malaysia

    NASA Astrophysics Data System (ADS)

    Farhayu Ariffin, Nur; Jaafar, Mohd Faizal Md; Idris Ali, Mohamad; Irwan Ramli, Noram; Muthusamy, Khairunisa; Shukor Lim, Nor Hasanah Abdul

    2018-03-01

    In Malaysia, the construction sector is one of the important sectors that contribute to economic growth and employments. However, a major concern facing the construction industry is the growing rate of delays in project delivery. In the worse cases, the projects were abandoned due to some reasons when the contract period ended. Abandoned building defines as construction work that has been continuously stalled for 6 months or more, during the project completion period or beyond the scheduled date of completion. When the projects become abandoned, it gives an adverse effect on many parties such as the developer, contractor, consultant and also client. According to previous researchers, the abandonment of building causes a serious problem and need some mitigation plan to avoid this problem from occurring. This study will investigate the fundamental factors that contribute to the abandonment of building and projects in Malaysia based on the current data of the abandoned building in most states in Malaysia. The data was collected from the respondents who is in the construction industry and had experience working with abandoned housing project. Form the respondents perspective, it shows that the main factor contribute to the building abandonment is due to the financial problem facing by the developer company.

  17. 77 FR 55208 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-07

    ... Southside Expansion Project (Project) involving construction and operation of facilities by Transcontinental... Beginning at 6:30 p.m., Brian's Restaurant (upstairs room), 625 East Atlantic Ave., South Hill, VA 23970.... The Project would include construction and operation of the following facilities: Approximately 91.4...

  18. GROWING ALTERNATIVE SUSTAINABLE BUILDINGS: BIO-COMPOSITE PRODUCTS FROM NATURAL FIBER, BIODEGRADABLE AND RECYCLABLE POLYMER MATERIALS FOR LOAD-BEARING CONSTRUCTION COMPONENTS

    EPA Science Inventory

    The project is an integrative educational and research project that will revolutionize design and construction methods towards more sustainable buildings. The project will develop and test new product design concepts using bio-composite materials in load-bearing and fa&cced...

  19. THE CONSTRUCTION AND VALIDATION OF A MEASURE OF VOCATIONAL MATURITY.

    ERIC Educational Resources Information Center

    CLARY, JOE R.; WESTBROOK, BERT W.

    THIS REPORT DEALS WITH THE ORGANIZATION, RATIONALE, METHODS AND EXPECTED END-PRODUCTS OF A RESEARCH PROJECT (SCHEDULED FOR COMPLETION ON JUNE 23, 1970) FOR THE CONSTRUCTION AND VALIDATION OF A RELIABLE VOCATIONAL MATURITY MEASURE (VMM). THE PROJECT'S EIGHT PHASES AND ACTIVITIES ARE EXPLAINED. THE PROJECT ASSUMES--(1) THE INDIVIDUAL AND SOCIETY AS…

  20. Albuquerque's constructed wetland pilot project for wastewater polishing

    Treesearch

    Michael D. Marcus; Shannon M. House; Nathan A. Bowles; Robert T. Sekiya; J. Steven Glass

    1999-01-01

    The City of Albuquerque has funded the Constructed Wetland Pilot Project (CWPP) since 1995 at the City's Southside Water Reclamation Plant (SWRP). Results from CWPP and other wetland treatment projects indicate that appropriately designed surface-flow wetlands could increase the cost-efficiencies of wastewater treatment, as well as help the City meet present and...

  1. B-WEST Regional Workforce Training Center. Building Workers Entering Skilled Trades. Final Report.

    ERIC Educational Resources Information Center

    Portland Community Coll., OR.

    The B-WEST (Building Workers Entering Skilled Trades) project was an 18-month demonstration project at a campus of Portland Community College (Oregon). During the B-WEST project, the following programs/components were developed: (1) a model building construction (electrical, mechanical, construction) trades program for unemployed and underemployed…

  2. LSCA (Library Services and Construction Act, Title I) Special Project Reports, Fiscal Year 1976.

    ERIC Educational Resources Information Center

    Massachusetts State Board of Library Commissioners, Boston.

    This collection of reports provides the objectives, background information, project descriptions, and evaluations for 16 public library programs funded through the Library Services and Construction Act in Massachusetts during FY 1976. The projects reflect the efforts being made by librarians to provide services to segments of their population who…

  3. 40 CFR 35.915-1 - Reserves related to the project priority list.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... § 35.908(b)(1)) for construction projects which use innovative or alternative waste water treatment... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915-1 Reserves related to the project priority list. In developing the fundable...

  4. 40 CFR 35.915-1 - Reserves related to the project priority list.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... § 35.908(b)(1)) for construction projects which use innovative or alternative waste water treatment... AND OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915-1 Reserves related to the project priority list. In developing the fundable...

  5. Constructing a Social Justice Tour: Pedagogy, Race, and Student Learning through Geography

    ERIC Educational Resources Information Center

    Barnd, Natchee

    2016-01-01

    This article describes a high-impact learning project that combines geography, history, and ethnic studies. It describes the construction of the course, student outcomes, and the final and publicly presented collaborative project: the Social Justice Tour of Corvallis. Based on work in a small largely white town, this project presents a…

  6. Efficiency improvement of the investment and innovation activities in the transport facility construction field with public-private partnership involvement

    NASA Astrophysics Data System (ADS)

    Shibayeva, Marina; Serebryakova, Yelena; Shalnev, Oleg

    2017-10-01

    Growing demand to increase the investment volume in modernization and development projects for transport infrastructure define the urgency of the current study. The amount of private sector investments in the field is insufficient to implement the projects for road construction due to their significant capital intensity and long payoff period. The implementation of social significant infrastructure projects on the principles of public-private partnership is one of the key strategic directions of growth for transport facilities. The authors come up with a concept and methodology for modeling the investment and innovation activity in the transport facility construction. Furthermore, there is developed a model to find the balance between public and private sector investments in implementing construction projects for transport infrastructure with involvement of PPP (further - public-private partnership). The suggested concepts aim to improve the efficiency rate of the investment and innovation activity in the field of transport facility construction on the basis of public and private sectors collaboration.

  7. Managment and construction of the Large Binocular Telescope enclosure: Meeting unusual challenges with a competitive discipline

    NASA Astrophysics Data System (ADS)

    Slagle, James H.; Hill, John M.; Davison, Warren B.; Hart, Wood; Teran, Jose U.

    1998-08-01

    Planning, estimating, and building a telescope and its enclosure within a budget is a challenge to any project staff. The Large Binocular Telescope (LBT) project office goal has been to break every phase of the project into small packages and competitively bid the packages. In this way the project office can minimize costs and keep the project budget from escalating out of control. This paper will discuss both the unique and common problems associated with the building of telescopes into the next millennium. The discussion is centered on the planning and execution phases of construction for the LBT, located on Mt. Graham in Arizona. The paper will discuss the effects of delays on the actual start of the telescope due to environmental issues and the impact the delays had on design and budget. The paper will provide the solutions that have been incorporated by the LBT project office to maximize the quality of construction while holding costs to a minimum. The use of a team approach by the contractors, engineers, and the project office has been successful in maintaining quality construction at a reasonable cost.

  8. Hospital renovation projects: phased construction requires planning at its best.

    PubMed

    Cox, J C

    1986-01-01

    Building a new hospital facility is a difficult task, but adding onto and renovating an existing structure while normal activity continues is even more difficult. Project planners, designers, contractors, and hospital managers must carefully program the joint effort of construction and hospital operation. Several factors in the construction process and potential problems for hospital operations are described to help hospital managers better anticipate difficulties before plans are finalized and construction commences.

  9. Whitetopping construction and early performance in Illinois

    DOT National Transportation Integrated Search

    2002-06-01

    Seven experimental whitetopping projects were constructed in Illinois between 1998 and 2001. Three of these projects included the rehabilitation of intersections, while the remaining four were a rehabilitation of mainline pavement. The three intersec...

  10. Savannah River Plant engineering, design, and construction history of ``S`` projects and other work, January 1961--December 1964. Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1970-03-01

    The work described in this volume of ``S`` Projects History is an extension of the type of work described in Volume I. E.I. du Pont de flemours & Company had entered into Contract AT (07-2)-l with the United States Atomic Energy Commission to develop, design, construct, install, and operate facilities to produce heavy water, fissionable materials, and related products. Under this contract,, Du Pont constructed and operated the Savannah River Plant. The engineering, design, and construction for most of the larger ``S`` projects was performed by the Engineering DeDartment. For some of the large and many of the smaller projectsmore » the Engineering Department was responsible only for the construction because the Atomic Energy Division (AED) of the Explosives Department handled the other phases. The Engineering Department Costruction Division also performed the physical work for many of the plant work orders. This volume includes a general description of the Du Pont Engineering Department activities pertaining to the engineering, design, and construction of the ``S`` projects at the Savannah River Plant; brief summaries of the projects and principal work requests; and supplementary informaticn on a few subjects in Volume I for which final data was not available at the closing date. Projects and other plant engineering work which were handled entirely by the Explosives Department -- AED are not included in this history.« less

  11. Guide to School Renovation and Construction: What You Need To Know To Protect Child and Adult Environmental Health.

    ERIC Educational Resources Information Center

    Healthy Schools Network, Inc., Albany, NY.

    This guide presents cautionary tips for protecting children's health during school renovation and construction projects, the New York state laws regarding school renovation and construction, and the steps the laws require to eliminate dangerous conditions for children during these projects. Included is a checklist of uniform safety standards…

  12. Relevance of Partnering as an Alternative Approach to Management of Construction Projects in Ghana

    ERIC Educational Resources Information Center

    Ansah, Samuel Kwame; Awere, Eric; Edu-Buandoh, Kobina Badu Micah

    2016-01-01

    Understandably, clients in both the public and the private sectors in Ghanaian construction industry have become increasingly dissatisfied. What they see is unpredictability and under-performance. What they receive is too often of poor quality, late and over-priced. More often contractors enter the construction project focusing on achieving their…

  13. 25 CFR 170.405 - Can tribal transportation planning funds be used for road construction and other projects?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Can tribal transportation planning funds be used for road construction and other projects? 170.405 Section 170.405 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR LAND AND WATER INDIAN RESERVATION ROADS PROGRAM Planning, Design, and Construction of Indian...

  14. Potential Pacific Rim demand for construction-grade softwood logs.

    Treesearch

    Donald F. Flora; Richard R. Vlosky

    1986-01-01

    Markets for small lower grade ("construction-grade"), softwood logs are projected to expand steadily through 1995. Log supplies will lag slightly behind demand until 1990, generating about a 10-percent increase in prices. Prices are expected to be level thereafter. United States exports of construction-grade logs are projected to increase 35 percent by 1990...

  15. 42 CFR 137.350 - Is a Self-Governance Tribe responsible for completing a construction project in accordance with...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Is a Self-Governance Tribe responsible for... SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Construction Roles of Self-Governance Tribe in Establishing and Implementing Construction Project Agreements § 137.350 Is a Self...

  16. Integrated surface management for pipeline construction: The Mid-America Pipeline Company Four Corners Project

    Treesearch

    Maria L. Sonett

    1999-01-01

    Integrated surface management techniques for pipeline construction through arid and semi-arid rangeland ecosystems are presented in a case history of a 412-mile pipeline construction project in New Mexico. Planning, implementation and monitoring for restoration of surface hydrology, soil stabilization, soil cover, and plant species succession are discussed. Planning...

  17. 48 CFR 652.236-72 - Statement of Qualifications for the Omnibus Diplomatic Security and Antiterrorism Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contract will require the construction of a multi-story office building, the prospective bidder/offeror..., etc.) Complexity: (office building, etc.) Type of construction: Value of project: If the prospective... (P.L. 99-399; 22 U.S.C. 4852). The Act limits certain construction projects abroad to United States...

  18. 42 CFR 137.272 - What other alternatives are available for Self-Governance Tribes to perform construction projects?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false What other alternatives are available for Self... SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.272 What other alternatives are available for Self-Governance Tribes to perform construction projects? Self-Governance Tribes also have the...

  19. 42 CFR 137.272 - What other alternatives are available for Self-Governance Tribes to perform construction projects?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false What other alternatives are available for Self... SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.272 What other alternatives are available for Self-Governance Tribes to perform construction projects? Self-Governance Tribes also have the...

  20. 42 CFR 137.272 - What other alternatives are available for Self-Governance Tribes to perform construction projects?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false What other alternatives are available for Self... SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.272 What other alternatives are available for Self-Governance Tribes to perform construction projects? Self-Governance Tribes also have the...

  1. 42 CFR 137.272 - What other alternatives are available for Self-Governance Tribes to perform construction projects?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false What other alternatives are available for Self... SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.272 What other alternatives are available for Self-Governance Tribes to perform construction projects? Self-Governance Tribes also have the...

  2. 42 CFR 137.272 - What other alternatives are available for Self-Governance Tribes to perform construction projects?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false What other alternatives are available for Self... SERVICES TRIBAL SELF-GOVERNANCE Construction Purpose and Scope § 137.272 What other alternatives are available for Self-Governance Tribes to perform construction projects? Self-Governance Tribes also have the...

  3. Comparative analysis of structural concrete Quality Assurance practices on nine nuclear and three fossil fuel power plant construction projects. Final summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Willenbrock, J.H.; Thomas, H.R. Jr.; Burati, J.J. Jr.

    1978-12-01

    A summary of two reports, COO/4120-1 and COO/4120-2, is given. A comparative analysis was made of the Quality Assurance practices related to the structural concrete phase on nine nuclear and three fossil fuel power plant projects which are (or have been) under construction in the United States in the past ten years. For the nuclear projects the analysis identified the response of each Quality Assurance program to the applicable criteria of 10 CFR Part 50, Appendix B as well as to the pertinent regulatory requirements and industry standards. For the fossil projects the analysis identified the response of each Qualitymore » Assurance program to criteria similar to those which were applicable in the nuclear situation. The major emphasis was placed on the construction aspects of the structural concrete phase of each project. The engineering and design aspects were examined whenever they interfaced with the construction aspects.« less

  4. Categorization of potential project cost overrun factors in construction industry

    NASA Astrophysics Data System (ADS)

    Karunakaran, P.; Abdullah, A. H.; Nagapan, S.; Sohu, S.; Kasvar, K. K.

    2018-04-01

    Cost overrun has been severely hit down the economy and reputations for many construction industry around the world. Many project management tools developed to control the budget of a project. However, the cost management is still considered poor as there are many cost overrun issues occurred in the construction industry. Thus, this paper aims to identify and cluster the potential construction project cost overrun factors according to their originating groups using the thematic approach. Basically, through literature review, all the potential factors that may cause cost overrun were screened thoroughly before they were clustered into seven (7) groups of the originating factors, namely project, contract, client, contractor, consultant, labour and external. Each potential factor was explained clearly with some examples based on the Malaysian case studies to illustrate the cost overrun scenario. These findings may aid in the future to highlight on how to mitigate the critical potential factors of cost overrun to reduce or overcome its impact on all the stakeholders involved.

  5. Puget Sound Tidal Energy In-Water Testing and Development Project Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Collar, Craig W

    2012-11-16

    Tidal energy represents potential for the generation of renewable, emission free, environmentally benign, and cost effective energy from tidal flows. A successful tidal energy demonstration project in Puget Sound, Washington may enable significant commercial development resulting in important benefits for the northwest region and the nation. This project promoted the United States Department of Energy's Wind and Hydropower Technologies Program's goals of advancing the commercial viability, cost-competitiveness, and market acceptance of marine hydrokinetic systems. The objective of the Puget Sound Tidal Energy Demonstration Project is to conduct in-water testing and evaluation of tidal energy technology as a first step towardmore » potential construction of a commercial-scale tidal energy power plant. The specific goal of the project phase covered by this award was to conduct all activities necessary to complete engineering design and obtain construction approvals for a pilot demonstration plant in the Admiralty Inlet region of the Puget Sound. Public Utility District No. 1 of Snohomish County (The District) accomplished the objectives of this award through four tasks: Detailed Admiralty Inlet Site Studies, Plant Design and Construction Planning, Environmental and Regulatory Activities, and Management and Reporting. Pre-Installation studies completed under this award provided invaluable data used for site selection, environmental evaluation and permitting, plant design, and construction planning. However, these data gathering efforts are not only important to the Admiralty Inlet pilot project. Lessons learned, in particular environmental data gathering methods, can be applied to future tidal energy projects in the United States and other parts of the world. The District collaborated extensively with project stakeholders to complete the tasks for this award. This included Federal, State, and local government agencies, tribal governments, environmental groups, and others. All required permit and license applications were completed and submitted under this award, including a Final License Application for a pilot hydrokinetic license from the Federal Energy Regulatory Commission. The tasks described above have brought the project through all necessary requirements to construct a tidal pilot project in Admiralty Inlet with the exception of final permit and license approvals, and the selection of a general contractor to perform project construction.« less

  6. Preventing patient absenteeism: validation of a predictive overbooking model.

    PubMed

    Reid, Mark W; Cohen, Samuel; Wang, Hank; Kaung, Aung; Patel, Anish; Tashjian, Vartan; Williams, Demetrius L; Martinez, Bibiana; Spiegel, Brennan M R

    2015-12-01

    To develop a model that identifies patients at high risk for missing scheduled appointments ("no-shows" and cancellations) and to project the impact of predictive overbooking in a gastrointestinal endoscopy clinic-an exemplar resource-intensive environment with a high no-show rate. We retrospectively developed an algorithm that uses electronic health record (EHR) data to identify patients who do not show up to their appointments. Next, we prospectively validated the algorithm at a Veterans Administration healthcare network clinic. We constructed a multivariable logistic regression model that assigned a no-show risk score optimized by receiver operating characteristic curve analysis. Based on these scores, we created a calendar of projected open slots to offer to patients and compared the daily performance of predictive overbooking with fixed overbooking and typical "1 patient, 1 slot" scheduling. Data from 1392 patients identified several predictors of no-show, including previous absenteeism, comorbid disease burden, and current diagnoses of mood and substance use disorders. The model correctly classified most patients during the development (area under the curve [AUC] = 0.80) and validation phases (AUC = 0.75). Prospective testing in 1197 patients found that predictive overbooking averaged 0.51 unused appointments per day versus 6.18 for typical booking (difference = -5.67; 95% CI, -6.48 to -4.87; P < .0001). Predictive overbooking could have increased service utilization from 62% to 97% of capacity, with only rare clinic overflows. Information from EHRs can accurately predict whether patients will no-show. This method can be used to overbook appointments, thereby maximizing service utilization while staying within clinic capacity.

  7. Reducing construction waste: A study of urban infrastructure projects.

    PubMed

    de Magalhães, Ruane Fernandes; Danilevicz, Ângela de Moura Ferreira; Saurin, Tarcisio Abreu

    2017-09-01

    The construction industry is well-known for producing waste detrimental to the environment, and its impacts have increased with the development process of cities. Although there are several studies focused on the environmental impact of residential and commercial buildings, less knowledge is available regarding decreasing construction waste (CW) generation in urban infrastructure projects. This study presents best practices to reduce waste in the said projects, stressing the role of decision-making in the design stage and the effective management of construction processes in public sector. The best practices were identified from literature review, document analysis in 14 projects of urban infrastructure, and both qualitative and quantitative survey with 18 experts (architects and engineers) playing different roles on those projects. The contributions of these research are: (i) the identification of the main building techniques related to the urban design typologies analyzed; (ii) the identification of cause-effect relationships between the design choices and the CW generation diagnosis; (iii) the proposal of a checklist to support the decision-making process, that can be used as a control and evaluation instrument when developing urban infrastructure designs, focused on the construction waste minimization (CWM). Copyright © 2017 Elsevier Ltd. All rights reserved.

  8. Forecast Inaccuracies in Power Plant Projects From Project Managers' Perspectives

    NASA Astrophysics Data System (ADS)

    Sanabria, Orlando

    Guided by organizational theory, this phenomenological study explored the factors affecting forecast preparation and inaccuracies during the construction of fossil fuel-fired power plants in the United States. Forecast inaccuracies can create financial stress and uncertain profits during the project construction phase. A combination of purposeful and snowball sampling supported the selection of participants. Twenty project managers with over 15 years of experience in power generation and project experience across the United States were interviewed within a 2-month period. From the inductive codification and descriptive analysis, 5 themes emerged: (a) project monitoring, (b) cost control, (c) management review frequency, (d) factors to achieve a precise forecast, and (e) factors causing forecast inaccuracies. The findings of the study showed the factors necessary to achieve a precise forecast includes a detailed project schedule, accurate labor cost estimates, monthly project reviews and risk assessment, and proper utilization of accounting systems to monitor costs. The primary factors reported as causing forecast inaccuracies were cost overruns by subcontractors, scope gaps, labor cost and availability of labor, and equipment and material cost. Results of this study could improve planning accuracy and the effective use of resources during construction of power plants. The study results could contribute to social change by providing a framework to project managers to lessen forecast inaccuracies, and promote construction of power plants that will generate employment opportunities and economic development.

  9. Fertilizer effects on attaining vegetation requirements.

    DOT National Transportation Integrated Search

    2014-02-01

    This project was developed to evaluate the effects of varying the substrate and fertilization regimes on the success of complex warm-season grass and forb seedings on recent roadside construction sites. Re-vegetating construction projects is required...

  10. Three Construction Projects with Wood Scraps

    ERIC Educational Resources Information Center

    Levine, Elizabeth

    1977-01-01

    Wood, a natural material, appeals to children of all ages. Wood construction allows children the flexibility of moving parts of their work around until they are satisfied with the arrangement. Three projects are described. (Author/RK)

  11. Evaluation of stainless steel reinforcement construction project

    DOT National Transportation Integrated Search

    2003-02-01

    Stainless steel reinforcement has greater corrosion resistance than that of the conventional reinforcement. In this project, bridge A6059, the first in Missouri utilizing stainless steel reinforcement in the deck, was constructed, along with bridge A...

  12. Risky business. Organizations tackle infection control during construction.

    PubMed

    Burmhal, Beth

    2003-06-01

    Construction projects, no matter how minor, can be dangerous for patients who are especially sensitive to infection. Guidelines from three prominent organizations are finally helping hospitals understand how to prevent infections during those projects.

  13. Earthworks logistics in the high density urban development conditions - case study

    NASA Astrophysics Data System (ADS)

    Sobotka, A.; Blajer, M.

    2017-10-01

    Realisation of the construction projects on highly urbanised areas carries many difficulties and logistic problems. Earthworks conducted in such conditions constitute a good example of how important it is to properly plan the works and use the technical means of the logistics infrastructure. The construction processes on the observed construction site, in combination with their external logistics service are a complex system, difficult for mathematical modelling and achievement of appropriate data for planning the works. The paper shows describe and analysis of earthworks during construction of the Centre of Power Engineering of AGH in Krakow for two stages of a construction project. At the planning stage in the preparatory phase (before realization) and in the implementation phase of construction works (foundation). In the first case, an example of the use of queuing theory for prediction of excavation time under random work conditions of the excavator and the associated trucks is provided. In the second case there is a change of foundation works technology resulting as a consequence of changes in logistics earthworks. Observation of the construction has confirmed that the use of appropriate methods of construction works management, and in this case agile management, the time and cost of the project have not been exceeded. The success of a project depends on the ability of the contractor to react quickly when changes occur in the design, technology, environment, etc.

  14. 75 FR 52374 - National Environmental Policy Act; NASA Glenn Research Center Plum Brook Station Wind Farm Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-25

    ...; NASA Glenn Research Center Plum Brook Station Wind Farm Project AGENCY: National Aeronautics and Space... Environmental Impact Statement (EIS) for the NASA GRC Plum Brook Station Wind Farm Project located near Sandusky... obtain public comments on construction and operation of the wind farm. The purpose of constructing and...

  15. Project-Based Vocational Education and Training: Opportunities for Teacher Guidance in a Swedish Upper Secondary School

    ERIC Educational Resources Information Center

    Fjellström, Magnus

    2015-01-01

    Project-based vocational education and training (PBVET) is a way to conduct vocational education in Swedish construction programmes. The educational settings used include projects ranging from minor construction to advanced houses. Due to limited research on this kind of educational setting, it is important to further develop knowledge on…

  16. 40. From Final Construction Report on the Haleakala Road ProjectNR7, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. From Final Construction Report on the Haleakala Road Project--NR-7, Hawaii National Park, Island of Maui, Territory of Hawaii, T.H. GENERAL VIEW OT THE PROJECT SHOWING CONSPICUOUS SCARS. THE BEFORE PHOTO OF A BEFORE AND AFTER SET. AFTER PHOTO IS HI-52-41. - Haleakala National Park Roads, Pukalani, Maui County, HI

  17. Costs Climb on Materials for Schools: Construction Projects Delayed, Scrapped

    ERIC Educational Resources Information Center

    Sack, Joetta L.

    2004-01-01

    The rapidly rising cost of steel and other construction materials is forcing some districts that are building new schools to scramble for more money, delay work, or redesign projects. Nationwide, contractors and architects are finding it harder to give accurate estimates on projects, and some have even had to renegotiate contracts with districts.…

  18. Learning Based on the Project Entitled "Design and Construction of a Wooden Bridge"

    ERIC Educational Resources Information Center

    Barris, Cristina; Torres, Lluís; Simon, Enric

    2016-01-01

    This article presents the results of a case involving the application of project-based learning carried out with students in the Mechanical Engineering degree program at the University of Girona. The project, entitled "Design and construction of a wooden bridge", was conducted at the Polytechnic School in the third-year Structures…

  19. A quantitative analysis study on the implementation of partnering in the design and build construction project

    NASA Astrophysics Data System (ADS)

    Halil, F. M.; Nasir, N. M.; Shukur, A. S.; Hashim, H.

    2018-02-01

    Design and Build construction project involved the biggest scale of the cost of investment as compared to the traditional approach. In Design and Build, the client hires a design professional that will design according to the client’s need and specification. This research aim is to explore the concept of partnering implementation practiced in the design and build procurement approach. Therefore, the selection of design professionals such as Contractors and consultants in the project is crucial to ensure the successful project completion on time, cost, and quality. The methodology adopted using quantitative approach. Administration of the questionnaire was distributed to the public client by using postal survey. Outcomes of the results, the public clients agreed that project management capabilities and commitment to budget as a crucial element of partnering from the design professional in design and build construction project.

  20. Reliability-based optimization design of geosynthetic reinforced road embankment.

    DOT National Transportation Integrated Search

    2014-07-01

    Road embankments are typically large earth structures, the construction of which requires for large amounts of competent fill soil. In order to limit costs, the utilization of geosynthetics in road embankments allows for construction of steep slopes ...