This report evaluates the impacts assessment and proposed mitigations provided in environmental documents concerning the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The projected impacts and proposed mitigations identified in UMTRA Project environmental documents were evaluated for two UMTRA Project sites. These sites are Gunnison and Durango, which are representative of currently active and inactive UMTRA Project sites, respectively. National Environmental Policy Act (NEPA) documentation was prepared for the remedial action at Durango and Gunnison as well as for the provision of an alternate water supply system at Gunnison. Additionally, environmental analysis was completed formore » mill site demolition Gunnison, and for a new road related to the Durango remedial action. The results in this report pertain only to the impact assessments prepared by the Regulatory Compliance staff as a part of the NEPA compliance requirements. Similarly, the mitigative measures documented are those that were identified during the NEPA process.« less
UMTRA project list of reportable occurrences
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-04-01
This UMTRA Project List of Reportable occurrences is provided to facilitate efficient categorization of reportable occurrences. These guidelines have been established in compliance with DOE minimum reporting requirements under DOE Order 5000.3B. Occurrences are arranged into nine groups relating to US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project operations for active sites. These nine groupings are provided for reference to determined whether an occurrence meets reporting requirement criteria in accordance with the minimum reporting requirements. Event groups and significance categories that cannot or will not occur, and that do not apply to UMTRA Project operations, aremore » omitted. Occurrence categorization shall be as follows: Group 1. Facility Condition; Group 2. Environmental; Group 3. Personnel Safety; Group 4. Personnel Radiation Protection; Group 5. Safeguards and Security; Group 6. Transportation; Group 7. Value Basis Reporting; Group 8. Facility Status; and Group 9. Cross-Category Items.« less
UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less
Environmental Assessment of Ground Water Compliance at the Durango, Colorado, UMTRA Project Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
N /A
2002-11-29
The U.S. Department of Energy (DOE) is proposing a ground water compliance strategy for the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Durango, Colorado. DOE has prepared this environmental assessment to provide the public with information concerning the potential effects of this proposed strategy.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Metzler, D.; Gibb, J.P.; Glover, W.A.
Compliance with the mandate of the Uranium Mill Tailings Radiation Control Act (UMTRCA) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites requires implementation of a groundwater remedial action plan that meets the requirements of Subpart B of the US Environmental Protection Agency`s proposed groundwater protection standards (40 CFR 192). The UMTRA Groundwater Project will ensure that unacceptable current risk or potential risk to the public health, safety and the environment resulting from the groundwater contamination attributable to the UMTRA sites, is mitigated in a timely and cost-efficient manner. For each UMTRA processing site and vicinity property where contamination exists,more » a groundwater remedial action plan must be developed that identifies hazardous constituents and establishes acceptable concentration limits for the hazardous constituents as either (a) alternate concentration limits (ACL), (b) maximum concentration limits (MCLs), (c) supplemental standards, or (d) background groundwater quality levels. Project optimization is a strategy that will aggressively work within the current regulatory framework using all available options to meet regulatory requirements. This strategy is outlined within.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the applicationmore » of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents.« less
Department of Energy PEIS scoping session
DOE Office of Scientific and Technical Information (OSTI.GOV)
Badar, L
1992-12-10
This is the second programmatic environmental impact statement scoping session held in Durango, Colorado. The purpose was: to present the ground water program so as to build some familiarity and understanding about the issue involved; and to get Durango community's input. Scoping is the collection of information and getting everyone involved and really making a team out of coming up with a proposed action. This report contains the presentations made by the project manager for the Uranium Mill Tailings (UMTRA) program, site manager for the Durango UMTRA site, manager of ground water hydrology, and include comments made by local residents.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wood, D.E.
This report presents discussions given at a conference on environmental remediation, September 8--11, Pasco, Washington. Topics include: public confidence; education; in-situ remediation; Hanford tank operations; risk assessments; field experiences; standards; site characterization and monitoring; technology discussions; regulatory issues; compliance; and the UMTRA project. Individual projects are processed separately for the data bases.
Site observational work plan for the UMTRA Project site at Monument Valley, Arizona
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agencymore » (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.« less
Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-03-01
This long-term surveillance plan (LTSP) for the Durango, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Durango (Bodo Canyon) disposal site, which will be referred to as the disposal site throughout this document. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal site continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). RRMs include tailings and other uranium ore processing wastesmore » still at the site, which the DOE determines to be radioactive. This LTSP is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992).« less
Wildlife mitigation and monitoring report Gunnison, Colorado, site
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-04-01
The Uranium Mill Tailings Remedial Action (UMTRA) Project is administered by the U.S. Department of Energy (DOE); its purpose is to cleanup uranium mill tailings and other contaminated material at 24 UMTRA Project sites in 10 states. This report summarizes the wildlife mitigation and monitoring program under way at the Gunnison UMTRA Project, Gunnison, Colorado. Remedial action at the Gunnison site was completed in December 1995 and is described in detail in the Gunnison completion report. The impacts of this activity were analyzed in the Gunnison environmental assessment (EA). These impacts included two important game species: the pronghorn antelope (Antilocapramore » americans) and sage grouse (Wentrocerus urophasianus). Haul truck traffic was predicted to limit antelope access to water sources north of the Tenderfoot Mountain haul road and that truck traffic along this and other haul roads could result in antelope road kills. Clearing land at the disposal cell, haul road and borrow site activities, and the associated human activities also were predicted to negatively impact (directly and indirectly) sage grouse breeding, nesting, loafing, and wintering habitat. As a result, an extensive mitigation and monitoring plan began in 1992. Most of the monitoring studies are complete and the results of these studies, written by different authors, appear in numerous reports. This report will: (1) Analyze existing impacts and compare them to predicted impacts. (2) Summarize mitigation measures. (3) Summarize all existing monitoring data in one report. (4) Analyze the effectiveness of the mitigation measures.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-09-01
For the UMTRA Project site located near Durango, Colorado (the Durango site), the Surface Project cleanup occurred from 1986 to 1991. An evaluation was made to determine whether exposure to ground water contaminated by uranium processing could affect people`s health. Exposure could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. In addition, environmental risks may result if plants or animals are exposed to contaminated ground water, or surface water that has mixed with contaminated ground water. This risk assessment report is the first site-specific document prepared for the UMTRA Ground Water Projectmore » at the Durango site. The results of this report and further site characterization of the Durango site will be used to determine what is necessary to protect public health and the environment, and to comply with the EPA standards.« less
Long-term surveillance plan for the Green River, Utah, disposal site
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-06-01
The long-term surveillance plan (LTSP) for the Green River, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Green River disposal cell. The U.S. Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This final LTSP was prepared as a requirement for acceptance under the U.S. Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). This LTSP documents whether the land and interests are owned by the United States or an Indian tribe and detailsmore » how the long-term care of the disposal site will be carried out. The Green River, Utah, LTSP is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-12-01
The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less
Buffer zone monitoring plan for the Dos Rios subdivision, Gunnison, Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-01
This report presents a plan for water quality monitoring at the Dos Rios subdivision (Units 2, 3, and the Island Unit) that is intended to satisfy the informational needs of residents who live southwest (downgradient) of the former Gunnison processing site. Water quality monitoring activities described in this report are designed to protect the public from residual contamination that entered the ground water as a result of previous uranium milling operations. Requirements presented in this monitoring plan are also included in the water sampling and analysis plan (WSAP) for the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project site. Themore » Gunnison WSAP is a site-specific document prepared by the U.S. Department of Energy (DOE) that provides background, guidance, and justification for future ground water sampling and analysis activities for the UMTRA Project Gunnison processing and disposal sites. The WSAP will be updated annually, as additional water quality data are collected and interpreted, to provide ongoing protection for public health and the environment.« less
Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1995-02-01
This risk assessment evaluates the possibility of health and environmental risks from contaminated ground water at the uranium mill tailings site near Durango, Colorado. The former uranium processing site`s contaminated soil and material were removed and placed at a disposal site located in Body Canyon, Colorado, during 1986--1991 by the US Departments of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating the nature and extent of ground water contamination at the site. This risk assessment follows an approach similar to that used by the US Environmental Protection Agency. The first step is to determinemore » what site-related contaminants are found in ground water samples. The next step in the risk assessment is to determine how much of these contaminants people might ingest if they got their drinking water from a well on the site. In accordance with standard practice for this type of risk assessment, the highest contaminant concentrations from the most contaminated wells are used. The risk assessment then explains the possible health problems that could result from this amount of contamination.« less
Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado. Revision 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-11-01
This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Act on (UMTRA) Project Bodo Canyon disposal site at Durango, Colorado, describes the surveillance activities for the disposal site. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal call continues to function as designed This LTSP was prepared as a requirement for DOE acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM) from processing uranium ore. This LTSP documents that the land and interests are owned by the United States andmore » details how long-term care of the disposal site will be carried out. It is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a). Following the introduction, contents of this report include the following: site final condition; site drawings and photographs; permanent site surveillance features; ground water monitoring; annual site inspections; unscheduled inspections; custodial maintenance; corrective action; record keeping and reporting requirements; emergency notification and reporting; quality assurance; personal health and safety; list of contributions; and references.« less
Technical approach to groundwater restoration. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-11-01
The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less
In situ remediation of uranium contaminated groundwater
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dwyer, B.P.; Marozas, D.C.
1997-02-01
In an effort to develop cost-efficient techniques for remediating uranium contaminated groundwater at DOE Uranium Mill Tailing Remedial Action (UMTRA) sites nationwide, Sandia National Laboratories (SNL) deployed a pilot scale research project at an UMTRA site in Durango, CO. Implementation included design, construction, and subsequent monitoring of an in situ passive reactive barrier to remove Uranium from the tailings pile effluent. A reactive subsurface barrier is produced by emplacing a reactant material (in this experiment various forms of metallic iron) in the flow path of the contaminated groundwater. Conceptually the iron media reduces and/or adsorbs uranium in situ to acceptablemore » regulatory levels. In addition, other metals such as Se, Mo, and As have been removed by the reductive/adsorptive process. The primary objective of the experiment was to eliminate the need for surface treatment of tailing pile effluent. Experimental design, and laboratory and field results are discussed with regard to other potential contaminated groundwater treatment applications.« less
In situ remediation of uranium contaminated groundwater
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dwyer, B.P.; Marozas, D.C.
1997-12-31
In an effort to develop cost-efficient techniques for remediating uranium contaminated groundwater at DOE Uranium Mill Tailing Remedial Action (UMTRA) sites nationwide, Sandia National Laboratories (SNL) deployed a pilot scale research project at an UMTRA site in Durango, CO. Implementation included design, construction, and subsequent monitoring of an in situ passive reactive barrier to remove Uranium from the tailings pile effluent. A reactive subsurface barrier is produced by emplacing a reactant material (in this experiment - various forms of metallic iron) in the flow path of the contaminated groundwater. Conceptually the iron media reduces and/or adsorbs uranium in situ tomore » acceptable regulatory levels. In addition, other metals such as Se, Mo, and As have been removed by the reductive/adsorptive process. The primary objective of the experiment was to eliminate the need for surface treatment of tailing pile effluent. Experimental design, and laboratory and field preliminary results are discussed with regard to other potential contaminated groundwater treatment applications.« less
Department of Energy Programmatic Environmental Impact Statement (PEIS) scoping session
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-12-31
The purpose of this programmatic environmental impact statement (PEIS) scoping meeting was: to present the ground water program so as to build some familiarity and understanding about the issue involved; and to get the Durango community`s input. This report contains the presentations made by the project manager for the uranium mill tailings program, site manager for the Durango UMTRA site, manager of ground water hydrology, and includes comments made by local residents.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-11-01
This report contains the comment and response document for the Draft Long-Term Surveillance Plan of the Bodo Canyon Site in Durango, California. This is a part of the Uranium Mill Tailings Remedial Action (UMTRA) Project. Questions and comments regarding specific sections or statements in the report are described and then a response to each review comment or question is provided.
UMTRA project water sampling and analysis plan, Durango, Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-01-01
Surface remedial action has been completed at the Uranium Mill Tailings Remedial Action Project in Durango, Colorado. Contaminated soil and debris have been removed from the former processing site and placed in the Bodo Canyon disposal cell. Ground water at the former uranium mill/tailings site and raffinate pond area has been contaminated by the former milling operations. The ground water at the disposal site was not impacted by the former milling operations at the time of the cell`s construction. Activities for fiscal 1994 involve ground water sampling and site characterization of the disposal site.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-01-29
The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all Title I sites. On September 24, 1987, the EPA published proposed standards (52FR36000-36008) in response to the remand. This report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project,more » as well as a discussion of the DOE's position on the proposed standards. The report also contains and appendix which provides supporting information and cost analyses. In order to assess the impacts of the proposed EPA standards, this report summarizes the proposed EPA standards in Section 2.0. The next three sections assess the impacts of the three parts of the EPA standards: Subpart A considers disposal sites; Subpart B is concerned with restoration at processing sites; and Subpart C addresses supplemental standards. Section 6.0 integrates previous sections into a recommendations section. Section 7.0 contains the DOE response to questions posed by the EPA in the preamble to the proposed standards. 6 refs., 5 figs., 3 tabs.« less
Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-10-01
The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) ofmore » riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1980-06-01
The Uranium Mill Tailings Remedial Action Program will require the preparation of several environmental impact statements and several environmental assessments. This guide begins with a section describing in general terms the efforts required to make these documents readable. The sections describe the formats to be used for the pages, headings, front matter, footnotes, lists, figures, tables, references, glossaries, indexes, and appendixes in these documents. A final section presents some rules of style to be followed in writing the texts.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
1996-10-01
This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonablemore » effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in accordance with the final standards. The EPA reserves the right to modify the ground water standards, if necessary, based on changes in EPA drinking water standards. Appendix A contains a copy of the 1983 EPA ground water compliance standards, the 1987 proposed changes to the standards, and the 1995 final rule. Under UMTRA, DOE is responsible for bringing the designated processing sites into compliance with the EPA ground water standards and complying with all other applicable standards and requirements. The U.S. Nuclear Regulatory Commission (NRC) must concur with DOE's actions. States are full participants in the process. The DOE also must consult with any affected Indian tribes and the Bureau of Indian Affairs. Uranium processing activities at most of the inactive mill sites resulted in the contamination of ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of constituents such as but not limited to uranium and nitrates. The purpose of the UMTRA Ground Water Project is to eliminate or reduce to acceptable levels the potential health and environmental consequences of milling activities by meeting the EPA ground water standards.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tyrrell, Evan; Denny, Angelita
Fifty-two groundwater samples and one surface water sample were collected at the Monument Valley, Arizona, Processing Site to monitor groundwater contaminants for evaluating the effectiveness of the proposed compliance strategy as specified in the 1999 Final Site Observational Work Plan for the UMTRA Project Site at Monument Valley, Arizona. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and-analysis-plan-us-department- energy-office-legacy-management-sites). Samples were collected for metals, anions, nitrate + nitrite as N, and ammonia as N analyses at all locations.
Cleanup protocol for 226Ra-contaminated cobbly soil at UMTRA Project sites
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gonzales, D.E.; Millard, J.B.; Miller, M.L.
The nonuniform distribution of 226Ra and other radiological contamination of cobbly soil encountered on several Uranium Mill Tailings Remedial Action Project sites is presented and discussed, and the concomitant challenges to the intent and implementation of the U.S. Environmental Protection Agency's soil cleanup standards are noted. In response to technical assessments and information presented to the U.S. Nuclear Regulatory Commission by the U.S. Department of Energy, the Nuclear Regulatory Commission has recently resolved the dilemma by concluding that compliance with Environmental Protection Agency soil cleanup standards for cobby soil at Uranium Mill Tailings Remedial Action Project sites would be adequatelymore » attained using bulk radionuclide concentrations, instead of requiring that the radionuclide concentration of the finer soil fraction passing a No. 4 mesh sieve met the standards. A Nuclear Regulatory Commission-approved procedure developed for cobbly soil remediation is outlined and discussed. The site-specific implementation of this procedure at Uranium Mill Tailings Remedial Action Project sites containing cobbly soil is estimated to save millions of dollars.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-12-01
To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards (Subpart A of 40 CFR 192), the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer (Cliff House/Menefee aquifer) at the point of compliance (POC) at the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site in Bodo Canyon near Durango, Colorado (DOE, 1989). Details of hydrologic site characterization at the disposal site are provided in Attachment 3, Groundwater Hydrology Report. The principal features of the water resources protectionmore » strategy for the Bodo Canyon disposal site are presented in this document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-01
This guidance document has two purposes: it provides guidance for writing site-specific long-term surveillance plans (LTSP) and it describes site surveillance, monitoring, and long-term care techniques for Title I disposal sites of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.). Long-term care includes monitoring, maintenance, and emergency measures needed to protect public health and safety and the environment after remedial action is completed. This document applies to the UMTRCA-designated Title I disposal sites. The requirements for long-term care of the Title I sites and the contents of the LTSPs are provided in U.S. Nuclearmore » Regulatory Commission (NRC) regulations (10 CFR Section 40.27) provided in Attachment 1.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1991-12-01
To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards (Subpart A of 40 CFR 192), the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer (Cliff House/Menefee aquifer) at the point of compliance (POC) at the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site in Bodo Canyon near Durango, Colorado (DOE, 1989). Details of hydrologic site characterization at the disposal site are provided in Attachment 3, Groundwater Hydrology Report. The principal features of the water resources protectionmore » strategy for the Bodo Canyon disposal site are presented in this document.« less
1996 monitoring report for the Gunnison, Colorado, wetlands mitigation plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-12-01
The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites was near the town of Gunnison, Colorado. Surface remediation was completed at the Gunnison site in December 1995. Remedial action resulted in the elimination of 4.3 acres of wetlands and mitigation of this loss is through the enhancement of 17.8 acres of riparian plant communities in six spring-fed areas on US Bureau of Land Management mitigation sites. A five-year monitoringmore » program was then implemented to document the response of vegetation and wildlife to the exclusion of livestock. This report provides the results of the third year of the monitoring program.« less
NASA Astrophysics Data System (ADS)
Carpenter, J.; Hyun, S.; Hayes, K. F.
2010-12-01
Uranium (U) originating from mining operations for weapon manufacturing and nuclear energy production is a significant radionuclide contaminant in groundwater local to uranium mining, uranium milling, and uranium mill tailing (UMT) storage sites. In the USA, the Department of Energy (DOE) is currently overseeing approximately 24 Uranium Mill Tailing Remediation Action (UMTRA) sites which have collectively processed over 27 million tons of uranium ore1,2. In-Situ microbial bio-reduction of the highly mobile U6+ ion into the dramatically less mobile U4+ ion has been demonstrated as an effective remedial process to inhibit uranium migration in the aqueous phase3. The resistance of this process to oxidization and possible remobilization of U when bioremediation stops (and oxidants such as oxygen from the air or nitrate in water diffuse into the formation) in the long term is not known. UMTRA site studies3 have shown that iron sulfide solids are produced by sulfate reducing bacteria (SRB) during U bioremediation, and some forms of these iron sulfide solids are known to be effective oxidant scavengers, potentially protecting against re-oxidation and thus remobilization of U. This work is investigating the role of iron sulfide solids in the long-term immobilization of reduced U compounds after bioremediation is completed in groundwater local to UMTRA sites. Re-oxidation tests are being performed in packed media columns loaded with both FeS and U solids. High quality mackinawite (FeS), and uraninite (UO2) have been synthesized in our laboratory via a wet chemistry approach. These synthetic materials are expected to mimic the naturally occurring and biogenic materials present in biologically stimulated UMTRA sites. In order to establish the initial conditions of the prepared experimental columns and to compare synthetic and biogenic FeS and UO2, these synthesized materials have been characterized with synchrotron radiation at the Stanford Synchrotron Radiation Lightsource using synchrotron x-ray powder diffraction (SXRD) and extended x-ray absorption fine structure (EXAFS). SXRD data were collected and analyzed with profile fitting to determine lattice parameters and crystallite size for comparison with published values for both biogenic and synthetic materials. This is particularly of interest for UO2, as there is very little information on particle size and lattice parameters for synthetic UO2 in the literature. Profile fitting of the SXRD data for FeS gives lattice parameters of a = b = 3.668 and a mean crystallite size of 5 to 8 nm. Both of these values are in good agreement with published values. For fresh UO2, lattice parameters were determined as a = b = c = 5.4 nm for both freshly synthesized and aged (3 months) UO2 and particle size was determined to be 3.5 nm for fresh UO2 and 5.83 nm for aged UO2. This suggests a growth mechanism for crystallites over time, and an inferred decrease in reactivity.
Progress Toward Remediation of Uranium Tailings in Mailuu-Suu, Kyrgyzstan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Buckley, P B; Ranville, J; Honeyman, B D
2003-07-09
The town of Mailuu-Suu in Kyrgyzstan inherited 23 distinct tailings deposits from Soviet-Era uranium mining operations. Mailuu-Suu is located in the narrow landslide-prone valley of the Mailuu-Suu River about 25 km from the Uzbekistan border. Large-scale release of the radioactive tailings, as a result of landslides, could lead to irreversible contamination of the river and downstream areas. The Mailuu-Suu River is a tributary to the Syr-Darya River, the Fergana valley's main source of irrigation water. The Fergana Valley is a key agricultural region and major population center that spans Kyrgyzstan, Tajikistan, and Uzbekistan. The trans-boundary nature of the Mailuu-Suu tailingsmore » issue presents an opportunity for collaboration among these Central Asian states. A cooperative approach to addressing environmental issues such as Mailuu-Suu may contribute to the region's stability by facilitating peaceful associations. Experience from remediation of sites in the US under the Uranium Mill Tailings Remediation Action Project (UMTRA) will be useful in progressing toward remediation at Mailuu-Suu.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bush, Richard; Lemke, Peter
The groundwater compliance strategy for the Tuba City, Arizona, Disposal Site is defined in the 1999 Phase I Ground Water Compliance Action Plan for the Tuba City, Arizona, UMTRA Site. Samples are collected and analyzed on a semiannual basis to evaluate the performance of the Phase I remediation system. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). U.S. Environmental Protection Agency (EPA) groundwater standards were exceeded in samples collected from monitoring wells as listed in Table 1. The data from this sampling eventmore » are generally consistent with previously obtained values and are acceptable for general use as qualified. Data anomalies are not significant with respect to the known nature and extent of contamination and progress of remedial action at the site. The data from this sampling event will be incorporated into the annual performance evaluation report that will present a comprehensive hydrologic summary and evaluation of groundwater remedial action performance at the Tuba City site through March 2016.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bush, Richard; Lemke, Peter
The groundwater compliance strategy for the Tuba City, Arizona, Disposal Site is defined in the 1999 Phase I Ground Water Compliance Action Plan for the Tuba City, Arizona, UMTRA Site. Samples are collected and analyzed on a semiannual basis to evaluate the performance of the Phase I remediation system. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). U.S. Environmental Protection Agency (EPA) groundwater standards were exceeded in samples collected from monitoring wells and extraction wells as listed in Table 1. The data frommore » this sampling event are generally consistent with previously obtained values and are acceptable for general use as qualified. Data anomalies are not significant with respect to the known nature and extent of contamination and progress of remedial action at the site. The data from this sampling event will be incorporated into the annual performance evaluation report that will present a comprehensive hydrologic summary and evaluation of groundwater remedial action performance at the Tuba City site through March 2016.« less
Bioremediation of Uranium-Contaminated Groundwater using Engineered Injection and Extraction
NASA Astrophysics Data System (ADS)
Greene, J. A.; Neupauer, R.; Ye, M.; Kasprzyk, J. R.; Mays, D. C.; Curtis, G. P.
2017-12-01
During in-situ remediation of contaminated groundwater, a treatment chemical is injected into the contaminated groundwater to react with and degrade the contaminant, with reactions occurring where the treatment chemical contacts the contaminant. Traditional in-situ groundwater remediation relies on background groundwater flow for spreading of treatment chemicals into contaminant plumes. Engineered Injection and Extraction (EIE), in which time-varying induced flow fields are used to actively spread the treatment chemical into the contaminant plume, has been developed to increase contact between the contaminant and treatment chemical, thereby enhancing contaminant degradation. EIE has been investigated for contaminants that degrade through irreversible bimolecular reaction with a treatment chemical, but has not been investigated for a contaminant governed by reversible reactions. Uranium primarily occurs in its aqueous, mobile form, U(VI), in the environment but can be bioreduced to its sparingly soluble, immobile form, U(IV), by iron reducing bacteria stimulated by an acetate amendment. In this study, we investigate the ability of EIE to facilitate and sustain favorable conditions to immobilize uranium during remediation, and to prevent re-mobilization of uranium into the aqueous phase after active remediation has ended. Simulations in this investigation are conducted using a semi-synthetic model based on physical and chemical conditions at the Naturita Uranium Mill Tailings Remedial Action (UMTRA) site in southwestern Colorado and the Old Rifle UMTRA site in western Colorado. The EIE design is optimized for the synthetic model using the Borg multi-objective evolutionary algorithm.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eric E. Roden
2009-07-08
This report summarizes research conducted in conjunction with a project entitled “Integrated Nucleic Acid System for In-Field Monitoring of Microbial Community Dynamics and Metabolic Activity”, which was funded through the Integrative Studies Element of the former NABIR Program (now the Environmental Remediation Sciences Program) within the Office of Biological and Environmental Research. Dr. Darrell Chandler (originally at Argonne National Laboratory, now with Akonni Biosystems) was the overall PI/PD for the project. The overall project goals were to (1) apply a model iron-reducer and sulfate-reducer microarray and instrumentation systems to sediment and groundwater samples from the Scheibe et al. FRC Areamore » 2 field site, UMTRA sediments, and other DOE contaminated sites; (2) continue development and expansion of a 16S rRNA/rDNA¬-targeted probe suite for microbial community dynamics as new sequences are obtained from DOE-relevant sites; and (3) address the fundamental molecular biology and analytical chemistry associated with the extraction, purification and analysis of functional genes and mRNA in environmental samples. Work on the UW subproject focused on conducting detailed batch and semicontinuous culture reactor experiments with uranium-contaminated FRC Area 2 sediment. The reactor experiments were designed to provide coherent geochemical and microbiological data in support of microarray analyses of microbial communities in Area 2 sediments undergoing biostimulation with ethanol. A total of four major experiments were conducted (one batch and three semicontinuous culture), three of which (the batch and two semicontinuous culture) provided samples for DNA microarray analysis. A variety of other molecular analyses (clone libraries, 16S PhyloChip, RT-PCR, and T-RFLP) were conducted on parallel samples from the various experiments in order to provide independent information on microbial community response to biostimulation.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bush, Richard; Lemke, Peter
Water samples were collected from 36 locations at New Rifle and Old Rifle, Colorado, Processing Sites. Duplicate samples were collected from New Rifle locations 0659 and 0855, and Old Rifle location 0304. One equipment blank was collected after decontamination of non-dedicated equipment used to collect one surface water sample. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). New Rifle Site Samples were collected at the New Rifle site from 16 monitoring wells and 7 surface locations in compliance with the December 2008more » Groundwater Compliance Action Plan [GCAP] for the New Rifle, Colorado, Processing Site (LMS/RFN/S01920), with one exception: New Rifle location 0635 could not be sampled because it was inaccessible; a fence installed by the Colorado Department of Transportation prevents access to this location. DOE is currently negotiating access with the Colorado Department of Transportation. Analytes measured at the New Rifle site included contaminants of concern (COCs) (arsenic, molybdenum, nitrate + nitrite as nitrogen, selenium, uranium, and vanadium) ammonia as nitrogen, major cations, and major anions. Field measurements of total alkalinity, oxidation- reduction potential, pH, specific conductance, turbidity, and temperature were made at each location, and the water level was measured at each sampled well. A proposed alternate concentration limit (ACL) for vanadium of 50 milligrams per liter (mg/L), specific to the compliance (POC) wells (RFN-0217, -0659, -0664, and -0669) is included in the New Rifle GCAP. Vanadium concentrations in the POC wells were below the proposed ACL as shown in the time-concentration graphs in the Data Presentation section (Attachment 2). Time-concentration graphs from all other locations sampled are also included in Attachment 2. Sampling location RFN-0195 was misidentified for the June/August 2014 and November 2014 sampling events. (Well RFN-0609 was inadvertently sampled instead of RFN-0195 in 2014.) The results for RFN-0195 have been corrected, and are included in associated time-concentration graphs for this location. Recent results for RFN-0195 are consistent with established trends with the possible exception of vanadium. The most recent result for vanadium showed an increase over recent values. Vanadium concentrations at RFN-0195 and other locations will continue to be evaluated in the future to determine the potential for deviations from established trends. The surface water locations were sampled to monitor the impact of groundwater discharge. COC concentrations at Colorado River surface water locations RFN-0324 and RFN-0326, downgradient of the site, remained low and were consistent with historical results, as shown in the time-concentration graphs. COC concentrations did not indicate there are any impacts related to groundwater discharge to the river. In many cases, elevated COC concentrations at the New Rifle site pond locations were observed, as shown in the time-versus concentration graphs. As noted in the GCAP, this indicates impacts from groundwater discharge to the ponds. Old Rifle Site Samples were collected at the Old Rifle site from eight monitoring wells and five surface locations in compliance with the December 2001 Groundwater Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site (GJ0-2000-177-TAR). Analytes measured at the Old Rifle site included COCs (selenium, uranium, and vanadium), major cations, and major anions. Field measurements of total alkalinity, oxidation-reduction potential, pH, specific conductance, turbidity, temperature, were made at each location, and the water level was measured at each sampled well. The monitoring strategy described in the GCAP is designed to determine progress of the natural flushing process in meeting compliance standards for site COCs. Standards for selenium and vanadium are the proposed ACLs of0.05 mg/L and 1.0 mg/L, respectively. For uranium the cleanup goal is the UMTRA standard of 0.044 mg/L or background, whichever is higher. As shown in the time concentration graphs, the uranium concentration exceeds the cleanup goal at groundwater monitoring locations RF0-0304, -0305, -0310, -0655, and -0656. The surface water locations were sampled to monitor the impact of groundwater discharge at Colorado River surface water locations adjacent to (RF0-0396) and downgradient of the site (RF0-0741). COC concentrations remain low and consistent with historical concentrations as shown in the time-concentration graphs (Attachment 2), which indicate no impacts from groundwater discharge to the river.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Peterson, Dave; Miller, David; Kautsky, Mark
A uranium- and vanadium-ore-processing mill operated from 1954 to 1968 within the Navajo Nation near Shiprock, New Mexico. By September 1986, all tailings and structures on the former mill property were encapsulated in a disposal cell built on top of two existing tailings piles on the Shiprock site (the site) [1]. Local groundwater was contaminated by multiple inorganic constituents as a result of the milling operations. The U.S. Department of Energy (DOE) took over management of the site in 1978 as part of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The DOE Office of Legacy Management currently manages ongoingmore » activities at the former mill facility, including groundwater remediation. Remediation activities are designed primarily to reduce the concentrations and total plume mass of the mill-related contaminants sulfate, uranium, and nitrate. In addition to contaminating groundwater in alluvial and bedrock sediments directly below the mill site, ore processing led to contamination of a nearby floodplain bordering the San Juan River. Groundwater in a shallow alluvial aquifer beneath the floodplain is strongly influenced by the morphology of the river channel as well as changing flows in the river, which provides drainage for regional runoff from the San Juan Mountains of Colorado. As part of a recent study of the floodplain hydrology, a revised conceptual model was developed for the alluvial aquifer along with an updated status of contaminant plumes that have been impacted by more than 10 years of groundwater pumping for site remediation purposes. Several findings from the recent study will be discussed here.« less
Investigation of background radiation levels and geologic unit profiles in Durango, Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
Triplett, G.H.; Foutz, W.L.; Lesperance, L.R.
1989-11-01
As part of the Uranium Mill Tailings Remedial Action (UMTRA) Project, Oak Ridge National Laboratory (ORNL) has performed radiological surveys on 435 vicinity properties (VPs) in the Durango area. This study was undertaken to establish the background radiation levels and geologic unit profiles in the Durango VP area. During the months of May through June, 1986, extensive radiometric measurements and surface soil samples were collected in the Durango VP area by personnel from ORNL's Grand Junction Office. A majority of the Durango VP surveys were conducted at sites underlain by Quaternary alluvium, older Quaternary gravels, and Cretaceous Lewis and Mancosmore » shales. These four geologic units were selected to be evaluated. The data indicated no formation anomalies and established regional background radiation levels. Durango background radionuclide concentrations in surface soil were determined to be 20.3 {plus minus} 3.4 pCi/g for {sup 40}K, 1.6 {plus minus} 0.5 pCi/g for {sup 226}Ra, and 1.2 {plus minus} 0.3 pCi/g for {sup 232}Th. The Durango background gamma exposure rate was found to be 16.5 {plus minus} 1.3 {mu}R/h. Average gamma spectral count rate measurements for {sup 40}K, {sup 226}Ra and {sup 232}Th were determined to be 553, 150, and 98 counts per minute (cpm), respectively. Geologic unit profiles and Durango background radiation measurements are presented and compared with other areas. 19 refs., 15 figs., 5 tabs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bachrach, A.; Hoopes, J.; Morycz, D.
1984-12-01
This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. Themore » US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.« less
Ranalli, Anthony J.; Naftz, David L.
2014-01-01
In 2010, the U.S Geological Survey (USGS), in cooperation with the Wind River Environmental Quality Commission (WREQC), began an assessment of the effectiveness of the existing monitoring network at the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) site. The USGS used existing data supplied by the U.S. Department of Energy (DOE). The study was to determine (1) seasonal variations in the direction of groundwater flow in the area of the former uranium processing facility toward the Little Wind River, (2) the extent of contaminated groundwater among the aquifers and between the aquifers and the Little Wind River, (3) whether current monitoring is adequate to establish the effectiveness of natural attenuation for the contaminants of concern, and (4) the influence of groundwater discharged from the sulfuric-acid plant on water quality in the Little Wind River.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bush, Richard; Lemke, Peter
Sampling Period: June 14–17 and July 7, 2016. Water samples were collected from 36 locations at New Rifle and Old Rifle, Colorado, Disposal/Processing Sites. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Duplicate samples were collected from New Rifle locations 0216 and 0855, and Old Rifle location 0655. One equipment blank was collected after decontamination of non-dedicated equipment used to collect one surface water sample. See Attachment 2, Trip Report for additional details. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Managementmore » Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). New Rifle Site Samples were collected at the New Rifle site from 16 monitoring wells and 7 surface locations in compliance with the December 2008 Groundwater Compliance Action Plan [GCAP] for the New Rifle, Colorado, Processing Site (LMS/RFN/S01920). Monitoring well 0216 could not be sampled in June because it was surrounded by standing water due to the high river stage from spring runoff, it was later sampled in July. Monitoring well 0635 and surface location 0322 could not be sampled because access through the elk fence along Interstate 70 has not been completed at this time. Old Rifle Site Samples were collected at the Old Rifle site from eight monitoring wells and five surface locations in compliance with the December 2001 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site (GJ0-2000-177-TAR).« less
Geochemical investigation of UMTRAP designated site at Durango, Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
Markos, G.; Bush, K.J.
1983-09-01
This report is the result of a geochemical investigation of the former uranium mill and tailings site at Durango, Colorado. This is one in a series of site specific geochemical investigations performed on the inactive uranium mill tailings included in the UMTRA Project. The objectives of the investigation are to characterize the geochemistry, to determine the contaminant distribution resulting from the former milling activities and tailings, and to infer chemical pathways and transport mechanisms from the contaminant distribution. The results will be used to model contaminant migration and to develop criteria for long-term containment media such as a cover systemmore » which is impermeable to contaminant migration. This report assumes a familiarity with the hydrologic conditions of the site and the geochemical concepts underlying the investigation. The results reported are based on a one-time sampling of waters and solid material from the background, the area adjacent to the site, and the site. The solid samples are water extracted remove easily soluble salts and acids extracted to remove cabonates and hydroxides. The water extracts and solid samples were analyzed for the major and trace elements. A limited number of samples were analyzed for radiological components. The report includes the methods of sampling, sample processing, analysis, and data interpretation. Three major conclusions are: (1) carbonate salts and low TDS characterize the tailings; (2) the adjacent area and raffinate ponds contain contaminants deposited by a single event of fluid permeation of the soils; and (3) the Animas River adjacent to the site has elevated gross alpha activity attributed to /sup 226/Ra in the sediments derived from the tailings or milling activities.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baldwin, Brett R.; Peacock, Aaron D.; Gan, M.
2009-09-23
An in-situ incubation device (ISI) was developed in order to investigate the stability and dynamics of sediment associated microbial communities to prevailing subsurface oxidizing or reducing conditions. Here we describe the use of these devices at the Old Rifle Uranium Mill Tailings Remedial Action (UMTRA) site. During the 7 month deployment oxidized Rifle aquifer background sediments (RABS) were deployed in previously biostimulated wells under iron reducing conditions, cell densities of known iron reducing bacteria including Geobacteraceae increased significantly showing the microbial community response to local subsurface conditions. PLFA profiles of RABS following in situ deployment were strikingly similar to thosemore » of adjacent sediment cores suggesting ISI results could be extrapolated to the native material of the test plots. Results for ISI deployed reduced sediments showed only slight changes in community composition and pointed toward the ability of the ISIs to monitor microbial community stability and response to subsurface conditions.« less
1997 Monitoring report for the Gunnison, Colorado Wetlands Mitigation Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-11-01
Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) cleaned up uranium mill tailings and other surface contamination near the town of Gunnison, Colorado. Remedial action resulted in the elimination of 4.3 acres (ac) (1.7 hectares [ha]) of wetlands. This loss is mitigated by the enhancement of six spring-fed areas on Bureau of Land Management (BLM) land (mitigation sites). Approximately 254 ac (1 03.3 ha) were fenced at the six sites to exclude grazing livestock. Of the 254 ac (103.3 ha), 17.8 ac (7.2 ha) are riparian plant communities; the rest are sagebrush communities.more » Baseline grazed conditions of the riparian plant communities at the mitigation sites were measured prior to fencing. This report discusses results of the fourth year of a monitoring program implemented to document the response of vegetation and wildlife to the exclusion of livestock. Three criteria for determining success of the mitigation were established: plant height, vegetation density (bare ground), and vegetation diversity. By 1996, Prospector Spring, Upper Long`s Gulch, and Camp Kettle met the criteria. The DOE requested transfer of these sites to BLM for long-term oversight. The 1997 evaluation of the three remaining sites, discussed in this report, showed two sites (Houston Gulch and Lower Long`s Gulch) meet the criteria. The DOE will request the transfer of these two sites to the BLM for long-term oversight. The last remaining site, Sage Hen Spring, has met only two of the criteria (percent bare ground and plant height). The third criterion, vegetation diversity, was not met. The vegetation appears to be changing from predominantly wet species to drier upland species, although the reason for this change is uncertain. It may be due to below-normal precipitation in recent years, diversion of water from the spring to the stock tank, or manipulation of the hydrology farther up gradient.« less
DOT National Transportation Integrated Search
2014-11-01
This document was developed for transportation professionals responsible for project : development and has three basic goals: : 1. Define project consistency and identify the causes of project inconsistencies and the : critical junctures in the proje...
Health and Safety Research Division: Progress report, October 1, 1985-March 31, 1987
DOE Office of Scientific and Technical Information (OSTI.GOV)
Walsh, P.J.
1987-09-01
This report summarizes the progress in our programs for the period October 1, 1985, through March 31, 1987. The division's presentations and publications represented important contributions on the forefronts of many fields. Eleven invention disclosures were filed, two patent applications submitted, and one patent issued. The company's transfers new technologies to the private sector more efficiently than in the past. The division's responsibilities to DOE under the Uranium Mill Tailings Remedial Action (UMTRA) program includes inclusion recommendations for 3100 properties. The nuclear medicine program developed new radiopharmaceuticals and radionuclide generators through clinical trials with some of our medical cooperatives. Twomore » major collaborative indoor air quality studies and a large epidemiological study of drinking water quality and human health were completed. ORNL's first scanning tunneling microscope (STM) has achieved single atom resolution and has produced some of the world's best images of single atoms on the surface of a silicon crystal. The Biological and Radiation Physics Section, designed and constructed a soft x-ray spectrometer which has exhibited a measuring efficiency that is 10,000 times higher than other equipment. 1164 refs.« less
DOT National Transportation Integrated Search
2016-07-01
Federal and state transportation planning statutory and regulatory laws require transportation projects to be : consistent with transportation plans and improvement programs before a federal action can be taken on a : project requiring one. Significa...
Lanning, Sharon K; Best, Al M; Temple, Henry J; Richards, Philip S; Carey, Allison; McCauley, Laurie K
2006-02-01
Accurate and consistent radiographic interpretation among clinical instructors is needed for assessment of teaching, student performance, and patient care. The purpose of this investigation was to determine if the method of radiographic viewing affects accuracy and consistency of instructors' determinations of bone loss. Forty-one clinicians who provide instruction in a dental school clinical teaching program (including periodontists, general dentists, periodontal graduate students, and dental hygienists) quantified bone loss for up to twenty-five teeth into four descriptive categories using a view box for plain film viewing or a projection system for digitized image viewing. Ratings were compared to the correct category as determined by direct measurement using the Schei ruler. Agreement with the correct choice for the view box and projection system was 70.2 percent and 64.5 percent, respectively. The mean difference was better for a projection system due to small rater error by graduate students. Projection system ratings were slightly less consistent than view box ratings. Dental hygiene faculty ratings were the most consistent but least accurate. Although the projection system resulted in slightly reduced accuracy and consistency among instructors, training sessions utilizing a single method for projecting digitized radiographic images have their advantages and may positively influence dental education and patient care by enhancing accuracy and consistency of radiographic interpretation among instructors.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ma, J; Qi, H; Wu, S
Purpose: In transmitted X-ray tomography imaging, projections are sometimes incomplete due to a variety of reasons, such as geometry inaccuracy, defective detector cells, etc. To address this issue, we have derived a direct consistency condition based on John’s Equation, and proposed a method to effectively restore incomplete projections based on this consistency condition. Methods: Through parameter substitutions, we have derived a direct consistency condition equation from John’s equation, in which the left side is only projection derivative of view and the right side is projection derivative of other geometrical parameters. Based on this consistency condition, a projection restoration method ismore » proposed, which includes five steps: 1) Forward projecting reconstructed image and using linear interpolation to estimate the incomplete projections as the initial result; 2) Performing Fourier transform on the projections; 3) Restoring the incomplete frequency data using the consistency condition equation; 4) Performing inverse Fourier transform; 5) Repeat step 2)∼4) until our criteria is met to terminate the iteration. Results: A beam-blocking-based scatter correction case and a bad-pixel correction case were used to demonstrate the efficacy and robustness of our restoration method. The mean absolute error (MAE), signal noise ratio (SNR) and mean square error (MSE) were employed as our evaluation metrics of the reconstructed images. For the scatter correction case, the MAE is reduced from 63.3% to 71.7% with 4 iterations. Compared with the existing Patch’s method, the MAE of our method is further reduced by 8.72%. For the bad-pixel case, the SNR of the reconstructed image by our method is increased from 13.49% to 21.48%, with the MSE being decreased by 45.95%, compared with linear interpolation method. Conclusion: Our studies have demonstrated that our restoration method based on the new consistency condition could effectively restore the incomplete projections, especially for their high frequency component.« less
The vaccines consistency approach project: an EPAA initiative.
De Mattia, F; Hendriksen, C; Buchheit, K H; Chapsal, J M; Halder, M; Lambrigts, D; Redhead, K; Rommel, E; Scharton-Kersten, T; Sesardic, T; Viviani, L; Ragan, I
2015-01-01
The consistency approach for release testing of established vaccines promotes the use of in vitro, analytical, non-animal based systems allowing the monitoring of quality parameters during the whole production process. By using highly sensitive non-animal methods, the consistency approach has the potential to improve the quality of testing and to foster the 3Rs (replacement, refinement and reduction of animal use) for quality control of established vaccines. This concept offers an alternative to the current quality control strategy which often requires large numbers of laboratory animals. In order to facilitate the introduction of the consistency approach for established human and veterinary vaccine quality control, the European Partnership for Alternatives to Animal Testing (EPAA) initiated a project, the "Vaccines Consistency Approach Project", aiming at developing and validating the consistency approach with stakeholders from academia, regulators, OMCLs, EDQM, European Commission and industry. This report summarises progress since the project's inception.
NASA Technical Reports Server (NTRS)
Garner, Lesley
2008-01-01
In 2006, NASA's Exploration Systems Mission Directorate (ESMD) launched two new Educational Projects: (1) The ESMID Space Grant Student Project ; and (2) The ESM1D Space Grant Faculty Project. The Student Project consists of three student opportunities: exploration-related internships at NASA Centers or with space-related industry, senior design projects, and system engineering paper competitions. The ESMID Space Grant Faculty Project consists of two faculty opportunities: (1) a summer faculty fellowship; and (2) funding to develop a senior design course.
NASA Technical Reports Server (NTRS)
Braden, Barry M.
2004-01-01
How does a Project Management Office provide: Consistent, familiar, easily used scheduling tools to Project Managers and project team members? Provide a complete list of organization resources available for use on the project? Facilitate resource tracking and visibility? Provide the myriad reports that the organization requires? Facilitate consistent budget planning and cost performance information? Provide all of this to the entire organization? Provide for the unique requirement of the organization? and get people to use it? Answer: Implementation of the Kennedy space Center Projects and Resources Online (KPRO), a modified COTS solution.
DOE Office of Scientific and Technical Information (OSTI.GOV)
David C. White
2005-09-14
NABIR funding at the University of Tennessee Center for Biomarker Analysis (CBA) has led to several key contributions to the investigation of bioremediation of metals and radionuclides. This lab has played an integral part in assessing microbial communities at the field scale at the ORNL FRC (Istok et al., 2004) and two UMTRA sites (Anderson et al., 2003, Chang et al., 2001). Our work over the period of the grant has resulted in 42-peer reviewed publications, 62 presentations (14 of which were international), and one patent pending. Currently CBA has 2 papers in press. The main objectives relating to themore » field portion of this program were to provide comprehensive biomarker analysis for NABIR collaborators to enhance the understanding of microbial geo-bioprocesses involved in the effective immobilization of metals (We have worked with and published or currently are publishing with 10 groups of NAIBR investigators). The laboratory portion of our research centered on methods development and has led to three major innovations that could result in a systematic way of evaluating sites for potential bioremediation. The first of these is the development of an in situ sampling device (Peacock et al., 2004, Anderson et al., 2003, Istok et al., 2004) for the collection and concentration of microbial biomass. The second is the development of expanded lipid analysis based on the significantly greater sensitivity and selectivity of the LC/MS/MS that allows the analysis of respiratory quinones, diglycerides, sterols, intact phospholipids, poly-hydroxyalkonates, and potentially archaeol, and caldarchaeols from archea. These new analyses are accomplished more rapidly and with increased sensitivities and resolution than in the past (Lytle et al., 2000a, 2000b, 2001a, Geyer et al., 2004). The third advance is the coupling of lipid analysis with 13C enrichment experiments (Lytle et al., 2001b, Geyer et al. 2005). With this technique it is now possible to follow the active portion of the in situ microbial community with a resolution heretofore not possible. These three advances in technology have been initially demonstrated at the NABIR Field Research Center (FRC) in Oak Ridge, TN and at the UMTRA Old Rifle site in Colorado. Microbial communities are of primary importance in the use of bioimmobilization strategies for metals and radionuclides from contaminated groundwater and sediments. These communities represent a potentially transformable agent that is able to affect virtually all biogeochemical pathways. Microorganisms can alter metal chemistry and mobility through reduction, accumulation, and immobilization and have been shown to be responsible for mineral formation and dissolution. Research is directed to provide collaborating NABIR investigators a rapid, comprehensive, and cost-effective suite of biomarker measurements to quantify microbial community structure, activity, and effectiveness, thereby providing defensible evidence that a desired bioprocess is occurring or may occur at a given site.« less
ERIC Educational Resources Information Center
Griffith, William S.; And Others
This document, consisting of seven chapters and 12 appendixes, is a full final report of the Doolittle Family Education Center Experimental In-Service Training Project. Chapter II consists of the history and plan of the project including an explanation of the framework of the model that was used to conceptualize the project. Chapter III is a…
Xia, Yan; Berger, Martin; Bauer, Sebastian; Hu, Shiyang; Aichert, Andre; Maier, Andreas
2017-01-01
We improve data extrapolation for truncated computed tomography (CT) projections by using Helgason-Ludwig (HL) consistency conditions that mathematically describe the overlap of information between projections. First, we theoretically derive a 2D Fourier representation of the HL consistency conditions from their original formulation (projection moment theorem), for both parallel-beam and fan-beam imaging geometry. The derivation result indicates that there is a zero energy region forming a double-wedge shape in 2D Fourier domain. This observation is also referred to as the Fourier property of a sinogram in the previous literature. The major benefit of this representation is that the consistency conditions can be efficiently evaluated via 2D fast Fourier transform (FFT). Then, we suggest a method that extrapolates the truncated projections with data from a uniform ellipse of which the parameters are determined by optimizing these consistency conditions. The forward projection of the optimized ellipse can be used to complete the truncation data. The proposed algorithm is evaluated using simulated data and reprojections of clinical data. Results show that the root mean square error (RMSE) is reduced substantially, compared to a state-of-the-art extrapolation method.
Berger, Martin; Bauer, Sebastian; Hu, Shiyang; Aichert, Andre
2017-01-01
We improve data extrapolation for truncated computed tomography (CT) projections by using Helgason-Ludwig (HL) consistency conditions that mathematically describe the overlap of information between projections. First, we theoretically derive a 2D Fourier representation of the HL consistency conditions from their original formulation (projection moment theorem), for both parallel-beam and fan-beam imaging geometry. The derivation result indicates that there is a zero energy region forming a double-wedge shape in 2D Fourier domain. This observation is also referred to as the Fourier property of a sinogram in the previous literature. The major benefit of this representation is that the consistency conditions can be efficiently evaluated via 2D fast Fourier transform (FFT). Then, we suggest a method that extrapolates the truncated projections with data from a uniform ellipse of which the parameters are determined by optimizing these consistency conditions. The forward projection of the optimized ellipse can be used to complete the truncation data. The proposed algorithm is evaluated using simulated data and reprojections of clinical data. Results show that the root mean square error (RMSE) is reduced substantially, compared to a state-of-the-art extrapolation method. PMID:28808441
Epipolar Consistency in Transmission Imaging.
Aichert, André; Berger, Martin; Wang, Jian; Maass, Nicole; Doerfler, Arnd; Hornegger, Joachim; Maier, Andreas K
2015-11-01
This paper presents the derivation of the Epipolar Consistency Conditions (ECC) between two X-ray images from the Beer-Lambert law of X-ray attenuation and the Epipolar Geometry of two pinhole cameras, using Grangeat's theorem. We motivate the use of Oriented Projective Geometry to express redundant line integrals in projection images and define a consistency metric, which can be used, for instance, to estimate patient motion directly from a set of X-ray images. We describe in detail the mathematical tools to implement an algorithm to compute the Epipolar Consistency Metric and investigate its properties with detailed random studies on both artificial and real FD-CT data. A set of six reference projections of the CT scan of a fish were used to evaluate accuracy and precision of compensating for random disturbances of the ground truth projection matrix using an optimization of the consistency metric. In addition, we use three X-ray images of a pumpkin to prove applicability to real data. We conclude, that the metric might have potential in applications related to the estimation of projection geometry. By expression of redundancy between two arbitrary projection views, we in fact support any device or acquisition trajectory which uses a cone-beam geometry. We discuss certain geometric situations, where the ECC provide the ability to correct 3D motion, without the need for 3D reconstruction.
Immersive visualization of rail simulation data.
DOT National Transportation Integrated Search
2016-01-01
The prime objective of this project was to create scientific, immersive visualizations of a Rail-simulation. This project is a part of a larger initiative that consists of three distinct parts. The first step consists of performing a finite element a...
Harnessing Alaska. [Hydroelectric power in Alaska
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
Four hydropower projects will provide electricity for isolated Alaskan cities by late 1984. A 15Mw project is already producing power. The three remaining hydro projects are described. Tyee Lake is a lake tap project. Water is supplied to the powerhouse by tapping the lake via a tunnel blasted through the lake bottom. Water then flows through a vertical pressure shaft to a power tunnel and into an aboveground powerhouse. Swan Lake consists of a double-curved arch dam and a power tunnel. Terror Lake consists of a concrete-faced compacted rockfill dam and a power tunnel.
24 CFR 266.200 - Eligible projects.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...
24 CFR 266.200 - Eligible projects.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...
24 CFR 266.200 - Eligible projects.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...
24 CFR 266.200 - Eligible projects.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...
Investigation of improved compaction by rubber-tire rollers : final report.
DOT National Transportation Integrated Search
1987-01-01
The study consisted of a review of the literature and field testing on five projects. The field testing on each project consisted of rolling a conventional section using the contractor's steel-wheel rollers and rolling a test section using a rubber-t...
75 FR 61480 - Cobscook Bay OCGenTM
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-05
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12711-004] Cobscook Bay.... The proposed project would consist of: (1) 5 TidGen TM hydrokinetic tidal devices each consisting of a... kilowatts; (2) a 4,530-foot-long submersible cable connecting the turbine-generating units of each device to...
DOT National Transportation Integrated Search
2015-04-01
This implementation project supports streamlined project delivery, one of the goals outlined by the Texas : Department of Transportation (TxDOT) leadership to achieve an efficient and effective transportation system : in Texas. The project benefits T...
Consonance in Information System Projects: A Relationship Marketing Perspective
ERIC Educational Resources Information Center
Lin, Pei-Ying
2010-01-01
Different stakeholders in the information system project usually have different perceptions and expectations of the projects. There is seldom consistency in the stakeholders' evaluations of the project outcome. Thus the outcomes of information system projects are usually disappointing to one or more stakeholders. Consonance is a process that can…
Managemant of NASA's major projects
NASA Technical Reports Server (NTRS)
James, L. B.
1973-01-01
Approaches used to manage major projects are studied and the existing documents on NASA management are reviewed. The work consists of: (1) the project manager's role, (2) request for proposal, (3) project plan, (4) management information system, (5) project organizational thinking, (6) management disciplines, (7) important decisions, and (8) low cost approach.
14 CFR 151.24 - Procedures: Application; information on estimated project costs.
Code of Federal Regulations, 2014 CFR
2014-01-01
... estimated project costs. 151.24 Section 151.24 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Development Projects § 151.24 Procedures: Application; information on estimated project costs. (a) If any part of the estimated project costs consists of the value of donated land, labor, materials, or equipment...
14 CFR 151.24 - Procedures: Application; information on estimated project costs.
Code of Federal Regulations, 2012 CFR
2012-01-01
... estimated project costs. 151.24 Section 151.24 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Development Projects § 151.24 Procedures: Application; information on estimated project costs. (a) If any part of the estimated project costs consists of the value of donated land, labor, materials, or equipment...
14 CFR 151.24 - Procedures: Application; information on estimated project costs.
Code of Federal Regulations, 2010 CFR
2010-01-01
... estimated project costs. 151.24 Section 151.24 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Development Projects § 151.24 Procedures: Application; information on estimated project costs. (a) If any part of the estimated project costs consists of the value of donated land, labor, materials, or equipment...
14 CFR 151.24 - Procedures: Application; information on estimated project costs.
Code of Federal Regulations, 2013 CFR
2013-01-01
... estimated project costs. 151.24 Section 151.24 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Development Projects § 151.24 Procedures: Application; information on estimated project costs. (a) If any part of the estimated project costs consists of the value of donated land, labor, materials, or equipment...
14 CFR 151.24 - Procedures: Application; information on estimated project costs.
Code of Federal Regulations, 2011 CFR
2011-01-01
... estimated project costs. 151.24 Section 151.24 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Development Projects § 151.24 Procedures: Application; information on estimated project costs. (a) If any part of the estimated project costs consists of the value of donated land, labor, materials, or equipment...
40 CFR 35.2204 - Project changes.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Project changes. 35.2204 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2204 Project changes. (a) Minor changes in the project work that are consistent with the objectives of the project and within the...
40 CFR 35.2204 - Project changes.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Project changes. 35.2204 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2204 Project changes. (a) Minor changes in the project work that are consistent with the objectives of the project and within the...
40 CFR 35.2204 - Project changes.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Project changes. 35.2204 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2204 Project changes. (a) Minor changes in the project work that are consistent with the objectives of the project and within the...
40 CFR 35.2204 - Project changes.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Project changes. 35.2204 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2204 Project changes. (a) Minor changes in the project work that are consistent with the objectives of the project and within the...
40 CFR 35.2204 - Project changes.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Project changes. 35.2204 Section 35... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works § 35.2204 Project changes. (a) Minor changes in the project work that are consistent with the objectives of the project and within the...
The Impact of Project Management Maturity upon IT/IS Project Management Outcomes
ERIC Educational Resources Information Center
Carcillo, Anthony Joseph, Jr.
2013-01-01
Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…
NASA Expendable Launch Vehicle (ELV) Payload Safety Review Process
NASA Technical Reports Server (NTRS)
Starbus, Calvert S.; Donovan, Shawn; Dook, Mike; Palo, Tom
2007-01-01
Issues addressed by this program: (1) Complicated roles and responsibilities associated with multi-partner projects (2) Working relationships and communications between all organizations involved in the payload safety process (3) Consistent interpretation and implementation of safety requirements from one project to the rest (4) Consistent implementation of the Tailoring Process (5) Clearly defined NASA decision-making-authority (6) Bring Agency-wide perspective to each ElV payload project. Current process requires a Payload Safety Working Group (PSWG) for eac payload with representatives from all involved organizations.
Spatially explicit global population scenarios consistent with the Shared Socioeconomic Pathways
Jones, B.; O’Neill, B. C.
2016-07-29
Here we report that the projected size and spatial distribution of the future population are important drivers of global change and key determinants of exposure and vulnerability to hazards. Spatial demographic projections are widely used as inputs to spatial projections of land use, energy use, and emissions, as well as to assessments of the impacts of extreme events, sea level rise, and other climate-related outcomes. To date, however, there are very few global-scale, spatially explicit population projections, and those that do exist are often based on simple scaling or trend extrapolation. Here we present a new set of global, spatiallymore » explicit population scenarios that are consistent with the new Shared Socioeconomic Pathways (SSPs) developed to facilitate global change research. We use a parameterized gravity-based downscaling model to produce projections of spatial population change that are quantitatively consistent with national population and urbanization projections for the SSPs and qualitatively consistent with assumptions in the SSP narratives regarding spatial development patterns. We show that the five SSPs lead to substantially different spatial population outcomes at the continental, national, and sub-national scale. In general, grid cell-level outcomes are most influenced by national-level population change, second by urbanization rate, and third by assumptions about the spatial style of development. However, the relative importance of these factors is a function of the magnitude of the projected change in total population and urbanization for each country and across SSPs. We also demonstrate variation in outcomes considering the example of population existing in a low-elevation coastal zone under alternative scenarios.« less
Spatially explicit global population scenarios consistent with the Shared Socioeconomic Pathways
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jones, B.; O’Neill, B. C.
Here we report that the projected size and spatial distribution of the future population are important drivers of global change and key determinants of exposure and vulnerability to hazards. Spatial demographic projections are widely used as inputs to spatial projections of land use, energy use, and emissions, as well as to assessments of the impacts of extreme events, sea level rise, and other climate-related outcomes. To date, however, there are very few global-scale, spatially explicit population projections, and those that do exist are often based on simple scaling or trend extrapolation. Here we present a new set of global, spatiallymore » explicit population scenarios that are consistent with the new Shared Socioeconomic Pathways (SSPs) developed to facilitate global change research. We use a parameterized gravity-based downscaling model to produce projections of spatial population change that are quantitatively consistent with national population and urbanization projections for the SSPs and qualitatively consistent with assumptions in the SSP narratives regarding spatial development patterns. We show that the five SSPs lead to substantially different spatial population outcomes at the continental, national, and sub-national scale. In general, grid cell-level outcomes are most influenced by national-level population change, second by urbanization rate, and third by assumptions about the spatial style of development. However, the relative importance of these factors is a function of the magnitude of the projected change in total population and urbanization for each country and across SSPs. We also demonstrate variation in outcomes considering the example of population existing in a low-elevation coastal zone under alternative scenarios.« less
7 CFR 622.11 - Eligible watershed projects.
Code of Federal Regulations, 2010 CFR
2010-01-01
... benefits consistent with protecting the Nation's environment (for structural water resource projects... 7 Agriculture 6 2010-01-01 2010-01-01 false Eligible watershed projects. 622.11 Section 622.11..., DEPARTMENT OF AGRICULTURE WATER RESOURCES WATERSHED PROJECTS Qualifications § 622.11 Eligible watershed...
The NCC project: A quality management perspective
NASA Technical Reports Server (NTRS)
Lee, Raymond H.
1993-01-01
The Network Control Center (NCC) Project introduced the concept of total quality management (TQM) in mid-1990. The CSC project team established a program which focused on continuous process improvement in software development methodology and consistent deliveries of high quality software products for the NCC. The vision of the TQM program was to produce error free software. Specific goals were established to allow continuing assessment of the progress toward meeting the overall quality objectives. The total quality environment, now a part of the NCC Project culture, has become the foundation for continuous process improvement and has resulted in the consistent delivery of quality software products over the last three years.
7 CFR Appendix D to Subpart B of... - Technical Report for Flexible Fuel Pumps
Code of Federal Regulations, 2014 CFR
2014-01-01
... flexible fuel pump projects, as defined in § 4280.103. (a) Qualifications of project team. The flexible fuel pump project team is expected to consist of a project manager, an equipment supplier of major... may serve more than one role. Authoritative evidence that project team service providers have the...
7 CFR Appendix D to Subpart B of... - Technical Report for Flexible Fuel Pumps
Code of Federal Regulations, 2012 CFR
2012-01-01
... flexible fuel pump projects, as defined in § 4280.103. (a) Qualifications of project team. The flexible fuel pump project team is expected to consist of a project manager, an equipment supplier of major... may serve more than one role. Authoritative evidence that project team service providers have the...
7 CFR Appendix D to Subpart B of... - Technical Report for Flexible Fuel Pumps
Code of Federal Regulations, 2013 CFR
2013-01-01
... flexible fuel pump projects, as defined in § 4280.103. (a) Qualifications of project team. The flexible fuel pump project team is expected to consist of a project manager, an equipment supplier of major... may serve more than one role. Authoritative evidence that project team service providers have the...
14 CFR 151.41 - Project costs.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Project costs. 151.41 Section 151.41... FEDERAL AID TO AIRPORTS Rules and Procedures for Airport Development Projects § 151.41 Project costs. (a) For the purposes of subparts B and C, project costs consist of any costs involved in accomplishing a...
14 CFR 151.41 - Project costs.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Project costs. 151.41 Section 151.41... FEDERAL AID TO AIRPORTS Rules and Procedures for Airport Development Projects § 151.41 Project costs. (a) For the purposes of subparts B and C, project costs consist of any costs involved in accomplishing a...
14 CFR 151.41 - Project costs.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Project costs. 151.41 Section 151.41... FEDERAL AID TO AIRPORTS Rules and Procedures for Airport Development Projects § 151.41 Project costs. (a) For the purposes of subparts B and C, project costs consist of any costs involved in accomplishing a...
14 CFR 151.41 - Project costs.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Project costs. 151.41 Section 151.41... FEDERAL AID TO AIRPORTS Rules and Procedures for Airport Development Projects § 151.41 Project costs. (a) For the purposes of subparts B and C, project costs consist of any costs involved in accomplishing a...
14 CFR 151.41 - Project costs.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Project costs. 151.41 Section 151.41... FEDERAL AID TO AIRPORTS Rules and Procedures for Airport Development Projects § 151.41 Project costs. (a) For the purposes of subparts B and C, project costs consist of any costs involved in accomplishing a...
49 CFR 633.13 - Initiation of PMO services.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.13... engineering phase of the project. However, consistent with other provisions in this part, the Administrator may determine that a project is a “major capital project” at any point during its implementation...
49 CFR 633.13 - Initiation of PMO services.
Code of Federal Regulations, 2014 CFR
2014-10-01
..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.13... engineering phase of the project. However, consistent with other provisions in this part, the Administrator may determine that a project is a “major capital project” at any point during its implementation...
49 CFR 633.13 - Initiation of PMO services.
Code of Federal Regulations, 2011 CFR
2011-10-01
..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.13... engineering phase of the project. However, consistent with other provisions in this part, the Administrator may determine that a project is a “major capital project” at any point during its implementation...
49 CFR 633.13 - Initiation of PMO services.
Code of Federal Regulations, 2012 CFR
2012-10-01
..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.13... engineering phase of the project. However, consistent with other provisions in this part, the Administrator may determine that a project is a “major capital project” at any point during its implementation...
49 CFR 633.13 - Initiation of PMO services.
Code of Federal Regulations, 2013 CFR
2013-10-01
..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.13... engineering phase of the project. However, consistent with other provisions in this part, the Administrator may determine that a project is a “major capital project” at any point during its implementation...
A closed-loop control-loading system
NASA Technical Reports Server (NTRS)
Ashworth, B. R.; Parrish, R. V.
1979-01-01
Langley Differential Maneuvering Simulator (DMS) realistically simulates two aircraft operating in differential mode. It consists of two identical fixed-base cockpits and dome projection systems. Each projection system consists of sky/Earth projector and target-image generator and projector. Although programmable control forces are small part of overall system, they play large role in providing pilot with kinesthetic cues.
ERIC Educational Resources Information Center
Bowman, Kaye; McKenna, Suzy
2016-01-01
This occasional paper provides an overview of the development of Australia's national training system and is a key knowledge document of a wider research project "Consistency with flexibility in the Australian national training system." This research project investigates the various approaches undertaken by each of the jurisdictions to…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-15
... of external factors on Project expectations. Including an ex post examination of project... consist of a narrative discussion detailing project successes and/or the influence of external factors on...
Liang, Yuting; Van Nostrand, Joy D.; N′Guessan, Lucie A.; Peacock, Aaron D.; Deng, Ye; Long, Philip E.; Resch, C. Tom; Wu, Liyou; He, Zhili; Li, Guanghe; Hazen, Terry C.; Lovley, Derek R.
2012-01-01
To better understand the microbial functional diversity changes with subsurface redox conditions during in situ uranium bioremediation, key functional genes were studied with GeoChip, a comprehensive functional gene microarray, in field experiments at a uranium mill tailings remedial action (UMTRA) site (Rifle, CO). The results indicated that functional microbial communities altered with a shift in the dominant metabolic process, as documented by hierarchical cluster and ordination analyses of all detected functional genes. The abundance of dsrAB genes (dissimilatory sulfite reductase genes) and methane generation-related mcr genes (methyl coenzyme M reductase coding genes) increased when redox conditions shifted from Fe-reducing to sulfate-reducing conditions. The cytochrome genes detected were primarily from Geobacter sp. and decreased with lower subsurface redox conditions. Statistical analysis of environmental parameters and functional genes indicated that acetate, U(VI), and redox potential (Eh) were the most significant geochemical variables linked to microbial functional gene structures, and changes in microbial functional diversity were strongly related to the dominant terminal electron-accepting process following acetate addition. The study indicates that the microbial functional genes clearly reflect the in situ redox conditions and the dominant microbial processes, which in turn influence uranium bioreduction. Microbial functional genes thus could be very useful for tracking microbial community structure and dynamics during bioremediation. PMID:22327592
7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects
Code of Federal Regulations, 2013 CFR
2013-01-01
...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...
7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects
Code of Federal Regulations, 2014 CFR
2014-01-01
...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...
7 CFR Appendix C to Subpart B of... - Technical Report for Hydropower Projects
Code of Federal Regulations, 2012 CFR
2012-01-01
...,000 require the services of a licensed professional engineer (PE) or team of PEs. Depending on the... services of a licensed PE or a team of licensed PEs may be required for smaller projects. (a) Qualifications of project team. The hydropower project team should consist of a system designer, a project...
NASA-DoD Lead-Free Electronics Project
NASA Technical Reports Server (NTRS)
Kessel, Kurt R.
2009-01-01
In response to concerns about risks from lead-free induced faults to high reliability products, NASA has initiated a multi-year project to provide manufacturers and users with data to clarify the risks of lead-free materials in their products. The project will also be of interest to component manufacturers supplying to high reliability markets. The project was launched in November 2006. The primary technical objective of the project is to undertake comprehensive testing to generate information on failure modes/criteria to better understand the reliability of: - Packages (e.g., TSOP, BOA, PDIP) assembled and reworked with solder interconnects consisting of lead-free alloys - Packages (e.g., TSOP, BOA, PDIP) assembled and reworked with solder interconnects consisting of mixed alloys, lead component finish/lead-free solder and lead-free component finish/SnPb solder.
NASA-DoD Lead-Free Electronics Project
NASA Technical Reports Server (NTRS)
Kessel, Kurt R.
2009-01-01
In response to concerns about risks from lead-free induced faults to high reliability products, NASA has initiated a multi-year project to provide manufacturers and users with data to clarify the risks of lead-free materials in their products. The project will also be of interest to component manufacturers supplying to high reliability markets. The project was launched in November 2006. The primary technical objective of the project is to undertake comprehensive testing to generate information on failure modes/criteria to better understand the reliability of: - Packages (e.g., TSOP, BGA, PDIP) assembled and reworked with solder interconnects consisting of lead-free alloys - Packages (e.g., TSOP, BGA, PDIP) assembled and reworked with solder interconnects consisting of mixed alloys, lead component finish/lead-free solder and lead-free component finish/SnPb solder.
Machunsky, Maya; Toma, Claudia; Yzerbyt, Vincent; Corneille, Olivier
2014-10-01
Social projection denotes the attribution of characteristics of the self to others and, therefore, increases perceived self-other similarity. The present research tests the assumption that positive but not negative targets elicit social projection. Earlier research has attributed an effect of target valence to mere consistency principles of judgment and has, thus, questioned projection processes to be the origin of self-other similarity. Building on more recent evidence, we suggest that target valence influences self-other similarity above and beyond a consistent response behavior. The results of three experiments in which target valence was manipulated through evaluative conditioning and by smiling versus neutral facial expression support our hypothesis. We discuss how cognitive versus motivated processes can account for these findings and suggest a new conceptualization of social projection whereby projection is a means to regulate social distance. © 2014 by the Society for Personality and Social Psychology, Inc.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-26
... Dam. The project will consist of up to 335 wind turbine generators (WTGs). Construction may consist of... County Wind Farm Project, Mohave County, AZ AGENCY: Bureau of Land Management, Interior. ACTION: Notice....gov/az/st/en/prog/energy/wind/mohave.html . In order to be included in the Draft EIS, all comments...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-30
..., activities, and projects on a public road that are consistent with a State strategic highway safety plan and correct or improve a hazardous road location or feature, or address a highway safety problem. Section 202..., activities, or projects on a public road that are consistent with a State Strategic Highway Safety Plan (SHSP...
Group Selection Methods and Contribution to the West Point Leadership Development System (WPLDS)
2015-08-01
Government. 14. ABSTRACT Group work in an academic setting can consist of projects or problems students can work on collaboratively. Although pedagogical ...ABSTRACT Group work in an academic setting can consist of projects or problems students can work on collaboratively. Although pedagogical studies...helping students develop intangibles like communication, time management, organization, leadership, interpersonal, and relationship skills. Supporting
Franz, R
2002-01-01
Stimulated by new ecology-driven European and national regulations, news routes of recycling waste appear on the market. Since food packages represent a large percentage of the plastics consumption and since they have a short lifetime, an important approach consists in making new packages from post-consumer used packages. On the other hand, food-packaging regulations in Europe require that packaging materials must be safe. Therefore, potential mass transfer (migration) of harmful recycling-related substances to the food must be excluded and test methods to ensure the safety-in-use of recycled materials for food packaging are needled. As a consequence of this situation, a European research project FAIR-CT98-4318, with the acronym 'Recyclability', was initiated. The project consists of three sections each focusing on a different class of recycled materials: polyethylene terephthalate (PET), paper and board, and plastics covered by functional barriers. The project consortium consists of 28 project members from 11 EU countries. In addition, the project is during its lifetime in discussion with the US Food and Drug Administrations (FDA) to consider also US FDA regulatory viewpoints and to aim, as a consequence, to harmonizable conclusions and recommendations. The paper introduces the project and presents an overview of the project work progress.
I-81 in-place pavement recycling project.
DOT National Transportation Integrated Search
2014-08-01
During the 2011 construction season, the Virginia Department of Transportation (VDOT) completed an in-place pavement : recycling project to rehabilitate a section of pavement on I-81 near Staunton, Virginia. The project consisted of a 3.66-mile : sec...
Post-project geomorphic assessment of a large process-based river restoration project
Erwin, Susannah O.; Schmidt, John C.; Allred, Tyler M.
2016-01-01
This study describes channel changes following completion of the Provo River Restoration Project (PRRP), the largest stream restoration project in Utah and one of the largest projects in the United States in which a gravel-bed river was fully reconstructed. We summarize project objectives and the design process, and we analyze monitoring data collected during the first 7 years after project completion. Post-project channel adjustment during the study period included two phases: (i) an initial phase of rapid, but small-scale, adjustment during the first years after stream flow was introduced to the newly constructed channel and (ii) a subsequent period of more gradual topographic adjustment and channel migration. Analysis of aerial imagery and ground-survey data demonstrate that the channel has been more dynamic in the downstream 4 km where a local source contributes a significant annual supply of bed material. Here, the channel migrates and exhibits channel adjustments that are more consistent with project objectives. The upstream 12 km of the PRRP are sediment starved, the channel has been laterally stable, and this condition may not be consistent with large-scale project objectives.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-31
... amendment is to correct language related to the number of points for Project Management to be consistent.... Delete the following text: 4. Project Management (10 points) Add the following text: Project Management... follows: 4. This amendment is to correct language related to the number of points for Project Management...
Combined Heat and Power Protocol for Uniform Methods Project | Advanced
Manufacturing Research | NREL Combined Heat and Power Protocol for Uniform Methods Project Combined Heat and Power Protocol for Uniform Methods Project NREL developed a protocol that provides a ; is consistent with the scope and other protocols developed for the Uniform Methods Project (UMP
Task Listings Resulting from the Vocational Competency Measures Project. Memorandum Report.
ERIC Educational Resources Information Center
American Institutes for Research in the Behavioral Sciences, Palo Alto, CA.
This memorandum report consists of 14 task listings resulting from the Vocational Competency Measures Project. (The Vocational Competency Measures Project was a test development project that involved the writing and verification of task listings for 14 vocational occupational areas through over 225 interviews conducted in 27 states.) Provided in…
Dissemination Package for Transition into Electronics (TIE) Project, October 1979-June 1980.
ERIC Educational Resources Information Center
Evergreen Valley Coll., San Jose, CA.
This dissemination package consists of a variety of advertising materials, forms, questionnaires, tests, and handouts developed as a part of the Transition into Electronics (TIE) Project. (The TIE Project was a project that developed, implemented, and evaluated a model designed to encourage persons to pursue education and training leading to…
Evaluation of Project Symbiosis: An Interdisciplinary Science Education Project.
ERIC Educational Resources Information Center
Altschuld, James W.
1993-01-01
The goal of this report is to provide a summary of the evaluation of Project Symbiosis which focused on enhancing the teaching of science principles in high school agriculture courses. The project initially involved 15 teams of science and agriculture teachers and was characterized by an extensive evaluation component consisting of six formal…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-02
... to the small size and particular location of this project and the close coordination with state and... Project would consist of: (1) Two existing concrete gravity dams consisting of a 60-foot-long, 18-foot-high overflow spillway, and an 85-foot-long, 18-foot-high gated spillway separated by a 70-foot-long...
Outlook for coastal plain forests: a subregional report from the Southern Forest Futures Project
Kier Klepzig; Richard Shelfer; Zanethia Choice
2014-01-01
The U.S. Coastal Plain consists of seven sections: the Northern Atlantic, Eastern Atlantic, Peninsular Florida, Southern Gulf, Middle Gulf-East, Middle Gulf-West, and Western Gulf. It covers a large area, consists of a diverse array of habitats, and supports a diverse array of uses. This report presents forecasts from the Southern Forest Futures Project that are...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-13
... as originally proposed would have consisted of 155 wind turbines (1.6 to 3.0 MW each) on 12,436 acres... the Refined Project, which involves the construction and operation of 112 wind turbines at the project... of the wind generation facility consisting of: up to 112 turbines with a generating capacity of 315...
NASA Technical Reports Server (NTRS)
Upchurch, Christopher
2011-01-01
The project, being the development of resource management applications, consisted entirely of my own effort. From deliverable requirements provided by my mentor, and some functional requirement additions generated through design reviews, It was my responsibility to implement the requested features as well as possible, given the resources available. For the most part development work consisted of database programming and functional testing using real resource data. Additional projects I worked on included some firing room console training, configuring the new NE-A microcontroller development lab network, mentoring high school CubeSat students, and managing the NE interns' component of the mentor appreciation ceremony.
1987-01-01
southern part of Shelby County, Tennessee (Figure 1-1). The project extends from the mouth of the creek at Lake McKellar upstream for a distance of 18.2 mi...project consists of two distinct improvement plans, each requiring a different ROW. From the mouth of the creek at Lake McKellar upstream to the confluence...in fact, consisted of a set of pier or wharf pilingssituated along the north bank of the creek at its junction with Lake McKellar(Figures 5-2 and 5-3
Matthew G. Rollins; Christine K. Frame
2006-01-01
The Landscape Fire and Resource Management Planning Tools Prototype Project, or LANDFIRE Prototype Project, began in April of 2002 and ended in April of 2005. The project was funded by the U.S. Department of Agriculture Forest Service and U.S. Department of the Interior. The objectives of the LANDFIRE Prototype Project were to develop the methods, tools, and protocols...
Optimizing 4DCBCT projection allocation to respiratory bins.
O'Brien, Ricky T; Kipritidis, John; Shieh, Chun-Chien; Keall, Paul J
2014-10-07
4D cone beam computed tomography (4DCBCT) is an emerging image guidance strategy used in radiotherapy where projections acquired during a scan are sorted into respiratory bins based on the respiratory phase or displacement. 4DCBCT reduces the motion blur caused by respiratory motion but increases streaking artefacts due to projection under-sampling as a result of the irregular nature of patient breathing and the binning algorithms used. For displacement binning the streak artefacts are so severe that displacement binning is rarely used clinically. The purpose of this study is to investigate if sharing projections between respiratory bins and adjusting the location of respiratory bins in an optimal manner can reduce or eliminate streak artefacts in 4DCBCT images. We introduce a mathematical optimization framework and a heuristic solution method, which we will call the optimized projection allocation algorithm, to determine where to position the respiratory bins and which projections to source from neighbouring respiratory bins. Five 4DCBCT datasets from three patients were used to reconstruct 4DCBCT images. Projections were sorted into respiratory bins using equispaced, equal density and optimized projection allocation. The standard deviation of the angular separation between projections was used to assess streaking and the consistency of the segmented volume of a fiducial gold marker was used to assess motion blur. The standard deviation of the angular separation between projections using displacement binning and optimized projection allocation was 30%-50% smaller than conventional phase based binning and 59%-76% smaller than conventional displacement binning indicating more uniformly spaced projections and fewer streaking artefacts. The standard deviation in the marker volume was 20%-90% smaller when using optimized projection allocation than using conventional phase based binning suggesting more uniform marker segmentation and less motion blur. Images reconstructed using displacement binning and the optimized projection allocation algorithm were clearer, contained visibly fewer streak artefacts and produced more consistent marker segmentation than those reconstructed with either equispaced or equal-density binning. The optimized projection allocation algorithm significantly improves image quality in 4DCBCT images and provides, for the first time, a method to consistently generate high quality displacement binned 4DCBCT images in clinical applications.
Are there trends towards drier hydrological conditions in Central America?
NASA Astrophysics Data System (ADS)
Hidalgo, H. G.
2013-12-01
A summary of hydrological projections at the end of the century from 30 General Circulation Models (GCMs) is presented; and several hydrometeorological parameters are analyzed to validate if there are hydroclimatological trends during the observational period (1982-2005) consistent with the GCMs results. At the end of the century the median of 30 GCM simulations projects a drier future for Tegucigalpa and San Jose, with a marked increment in evapotranspiration in the first half of the rainy season along with reductions of soil moisture. With respect to the observations (1982-2005): 1) the Normalized Difference Vegetation Index showed negative trends in the North Pacific coast of Costa Rica, the border of Honduras and Nicaragua, and especially in southern Mexico (except the Yucatan Peninsula). Positive trends were found in the several parts of Central America, 2) the Palmer Drought Severity Index showed strong and consistent trends from Nicaragua to the North of Central America and southern Mexico (not including Yucatan), consistent with the direction of GCM projections; 3) negative precipitation trends in satellite data were found in Nicaragua, with strong trends in its Caribbean coast; 4) NCEP/NCAR Reanalysis precipitation showed strong negative trends in northern Central America, the Central Valley, the Dry Pacific of Costa Rica and the South-Pacific coast of Nicaragua, all consistent with the direction of GCM projections; and 5) station data showed no significant trends however, and 6) Reanalysis' temperature showed positive trends in southern Mexico (not including Yucatan) and negative trends in El Salvador. It can be concluded that several trends in drought indexes and precipitation are consistent with the future projected by the GCMs; that is, with some exceptions some of the trends were validated towards a drier future for the region, especially in the northern part.
Code of Federal Regulations, 2010 CFR
2010-04-01
... HOUSING OPERATING FUND PROGRAM Asset Management § 990.255 Overview. (a) PHAs shall manage their properties according to an asset management model, consistent with the management norms in the broader multi-family management industry. PHAs shall also implement project-based management, project-based budgeting, and project...
REMEDIATION TECHNOLOGY EVALUATION AT THE GILT EDGE MINE, SOUTH DAKOTA
This document reports the findings of the Mine Waste Technology Program's Activity III, Project 29,The Remediation Technology Evaluation Project at the Gilt Edge Mine, S.D. This project consisted of evaluating three emerging acidic waste rock stabilization technologies and compar...
Code of Federal Regulations, 2011 CFR
2011-04-01
... HOUSING OPERATING FUND PROGRAM Asset Management § 990.255 Overview. (a) PHAs shall manage their properties according to an asset management model, consistent with the management norms in the broader multi-family management industry. PHAs shall also implement project-based management, project-based budgeting, and project...
New England Lakes & Ponds Project
The New England Lakes and Ponds Project provides a consistent and first time comprehensive assessment of the ecological and water quality condition of lakes and ponds across the New England region. The project is being conducted by EPA along with the New England Interstate Water...
NASA Astrophysics Data System (ADS)
Bradford, J. B.; Schlaepfer, D.; Palmquist, K. A.; Lauenroth, W.
2017-12-01
Climate projections for western North America suggest temperature increases that are relatively consistent across climate models. However, precipitation projections are less consistent, especially in the Southwest, promoting uncertainty about the future of soil moisture and drought. We utilized a daily time-step ecosystem water balance model to characterize soil temperature and moisture patterns at a 10-km resolution across western North America for historical (1980-2010), mid-century (2020-2050), and late century (2070-2100). We simulated soil moisture and temperature under two representative concentration pathways and eleven climate models (selected strategically to represent the range of variability in projections among the full set of models in the CMIP5 database and perform well in hind-cast comparisons for the region), and we use the results to identify areas with robust projections, e.g. areas where the large majority of models agree in the direction of change in long-term average soil moisture or temperature. Rising air temperatures will increase average soil temperatures across western North America and expand the area of mesic and thermic soil temperature regimes while decreasing the area of cryic and frigid regimes. Future soil moisture conditions are relatively consistent across climate models for much of the region, including many areas with variable precipitation trajectories. Consistent projections for drier soils are expected in most of Arizona and New Mexico, similar to previous studies. Other regions with projections for declining soil moisture include the central and southern U.S. Great Plains and large parts of southern British Columbia. By contrast, areas with robust projections for increasing soil moisture include northeastern Montana, southern Alberta and Saskatchewan, and many areas in the intermountain west dominated by big sagebrush. In addition, seasonal moisture patterns in much of the western US drylands are expected to shift toward cool-season water availability, with potentially important consequences for ecosystem structure and function. These results provide a framework for coping with variability in climate projections and assessing climate change impacts on dryland ecosystems.
Dream Team--The Case of an Undergraduate Surgical Talent Development Project
ERIC Educational Resources Information Center
Jensen, Rune Dall; Ljungmann, Ken; Christensen, Mette Krogh; Møldrup, Ulla; Grøndal, Anne Krogh; Mogensen, Mads Filtenborg; Seyer-Hansen, Mikkel
2016-01-01
To be successful, a surgeon must master a variety of skills. To meet the high demand for surgical expertise, an extracurricular undergraduate project was launched. The extracurricular project consists of hands-on laparoscopic training and a mentorship programme. The project aims to find the best surgical talents among fourth-year medical students.…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-06
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13212-002] Grant Lake.... The proposed project would consist of: (1) Either (a) a 2-foot-high by 120-foot-long, concrete gravity... project reservoir, with a total storage capacity of 15,900 acre-feet and a water surface area of 1,790...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-30
... Micro-Hydropower Project. f. Location: The proposed Antrim Micro-Hydropower Project will be located on... motions filed. k. Description of Project: The proposed Antrim Micro-Hydropower Project will consist of: (1...-feet to the treatment plant, where it will be connected to the interstate grid; and (6) appurtenant...
Chapter 12 - Mapping wildland fuel across large regions for the LANDFIRE Prototype Project
Robert E. Keane; Tracey Frescino; Matthew C. Reeves; Jennifer L. Long
2006-01-01
The Landscape Fire and Resource Management Planning Tools Prototype Project, or LANDFIRE Prototype Project, required that the entire array of wildland fuel characteristics be mapped to provide fire and landscape managers with consistent baseline geo-spatial information to plan projects for hazardous fuel mitigation and to improve public and firefighter safety. Fuel...
Chapter 14 - Dissemination of LANDFIRE Prototype Project data
Jeff Eidenshink
2006-01-01
The transfer of LANDFIRE data to users is the most important aspect of the Landscape Fire and Resource Management Planning Tools Project (LANDFIRE Prototype Project). The creation of an accurate, consistent, nationwide data set provides the foundation for a successful project. The final step is to make the data readily available to the user community. User capabilities...
76 FR 77217 - Dominion Transmission, Inc.; Notice of Application
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-12
.... The total project cost is estimated to be $16,759,375.00. A more detailed description of the project... Project which consists of 3.56 miles of new 24-inch-diameter pipeline (TL-610) as well as various... this project. First, any person wishing to obtain legal status by becoming a party to the proceedings...
Survey of Maritime Experiences in Reduced Workload and Staffing
1999-07-01
flexibility. National Technical University of Athens. ATOMOS (Advanced Technology to optimize manpower onboard ships) Project Rationale. (1996) http...applied R&D in this area, sponsored project ATOMOS , within its EURET transport R&D programme. ATOMOS consists of a consortium of 9 partners from 4 EU...period December 1994- December 1995) The THAMES Consortium consisted of the partners of two EURET consortia: ATOMOS and MASIS. Collectively, 21 partners
40 CFR 57.603 - Criteria for approval.
Code of Federal Regulations, 2014 CFR
2014-07-01
... the proposed funding and staffing of the project appear adequate for its successful completion; (c) Whether the proposed level of funding for the project is consistent with the research and development... pollutants of both occupational and environmental significance; (f) The potential effects of the project on...
40 CFR 57.603 - Criteria for approval.
Code of Federal Regulations, 2010 CFR
2010-07-01
... the proposed funding and staffing of the project appear adequate for its successful completion; (c) Whether the proposed level of funding for the project is consistent with the research and development... pollutants of both occupational and environmental significance; (f) The potential effects of the project on...
40 CFR 57.603 - Criteria for approval.
Code of Federal Regulations, 2011 CFR
2011-07-01
... the proposed funding and staffing of the project appear adequate for its successful completion; (c) Whether the proposed level of funding for the project is consistent with the research and development... pollutants of both occupational and environmental significance; (f) The potential effects of the project on...
40 CFR 57.603 - Criteria for approval.
Code of Federal Regulations, 2012 CFR
2012-07-01
... the proposed funding and staffing of the project appear adequate for its successful completion; (c) Whether the proposed level of funding for the project is consistent with the research and development... pollutants of both occupational and environmental significance; (f) The potential effects of the project on...
CTEPP STANDARD OPERATING PROCEDURE FOR CONDUCTING STAFF AND PARTICIPANT TRAINING (SOP-2.27)
This SOP describes the method to train project staff and participants to collect various field samples and questionnaire data for the study. The training plan consists of two separate components: project staff training and participant training. Before project activities begin,...
CONTROL TECHNOLOGIES: PILOT- & FULL-SCALE TESTS
Two different project are to be supported in FY03. The first project is being conducted by the North Dakota Energy and Environmental Research Center (ND-EERC). This project consists of tests on coal-fired utility boilers to determine the effects of SCR catalysts and ammonia in...
Projection correlation between two random vectors.
Zhu, Liping; Xu, Kai; Li, Runze; Zhong, Wei
2017-12-01
We propose the use of projection correlation to characterize dependence between two random vectors. Projection correlation has several appealing properties. It equals zero if and only if the two random vectors are independent, it is not sensitive to the dimensions of the two random vectors, it is invariant with respect to the group of orthogonal transformations, and its estimation is free of tuning parameters and does not require moment conditions on the random vectors. We show that the sample estimate of the projection correction is [Formula: see text]-consistent if the two random vectors are independent and root-[Formula: see text]-consistent otherwise. Monte Carlo simulation studies indicate that the projection correlation has higher power than the distance correlation and the ranks of distances in tests of independence, especially when the dimensions are relatively large or the moment conditions required by the distance correlation are violated.
NASA-DoD Lead-Free Electronics Project
NASA Technical Reports Server (NTRS)
Kessel, Kurt
2009-01-01
In response to concerns about risks from lead-free induced faults to high reliability products, NASA has initiated a multi-year project to provide manufacturers and users with data to clarify the risks of lead-free materials in their products. The project will also be of interest to component manufacturers supplying to high reliability markets. The project was launched in November 2006. The primary technical objective of the project is to undertake comprehensive testing to generate information on failure modes/criteria to better understand the reliability of: (1) Packages (e.g., Thin Small Outline Package [TSOP], Ball Grid Array [BGA], Plastic Dual In-line Package [PDIP]) assembled and reworked with solder interconnects consisting of lead-free alloys (2) Packages (e.g., TSOP, BGA, PDIP) assembled and reworked with solder interconnects consisting of mixed alloys, lead component finish/lead-free solder and lead-free component finish/SnPb solder
FY2007 Laboratory Directed Research and Development Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Craig, W W; Sketchley, J A; Kotta, P R
The Laboratory Directed Research and Development (LDRD) annual report for fiscal year 2007 (FY07) provides a summary of LDRD-funded projects for the fiscal year and consists of two parts: An introduction to the LDRD Program, the LDRD portfolio-management process, program statistics for the year, and highlights of accomplishments for the year. A summary of each project, submitted by the principal investigator. Project summaries include the scope, motivation, goals, relevance to Department of Energy (DOE)/National Nuclear Security Administration (NNSA) and Lawrence Livermore National Laboratory (LLNL) mission areas, the technical progress achieved in FY07, and a list of publications that resulted frommore » the research in FY07. Summaries are organized in sections by research category (in alphabetical order). Within each research category, the projects are listed in order of their LDRD project category: Strategic Initiative (SI), Exploratory Research (ER), Laboratory-Wide Competition (LW), and Feasibility Study (FS). Within each project category, the individual project summaries appear in order of their project tracking code, a unique identifier that consists of three elements. The first is the fiscal year the project began, the second represents the project category, and the third identifies the serial number of the proposal for that fiscal year.« less
Framework for Automation of Hazard Log Management on Large Critical Projects
NASA Astrophysics Data System (ADS)
Vinerbi, Lorenzo; Babu, Arun P.
2016-08-01
Hazard log is a database of all risk management activities in a project. Maintaining its correctness and consistency on large safety/mission critical projects involving multiple vendors, suppliers, and partners is critical and challenging. IBM DOORS is one of the popular tool used for hazard management in space applications. However, not all stake- holders are familiar with it. Also, It is not always feasible to expect all stake-holders to provide correct and consistent hazard data.The current work describes the process and tools to simplify the process of hazard data collection on large projects. It demonstrates how the collected data from all stake-holders is merged to form the hazard log while ensuring data consistency and correctness.The data provided by all parties are collected using a template containing scripts. The scripts check for mistakes based on internal standards of company in charge of hazard management. The collected data is then subjected to merging in DOORS, which also contain scripts to check and import data to form the hazard log. The proposed tool has been applied to a mission critical project, and has been found to save time and reduce the number of mistakes while creating the hazard log. The use of automatic checks paves the way for correct tracking of risk and hazard analysis activities for large critical projects.
DOT National Transportation Integrated Search
2014-03-01
Streamlined project delivery is a federally : mandated goal that the Texas Department of : Transportation (TxDOT) leadership supports to : achieve a more efficient and effective : transportation system in Texas. : Federal and state transportation pla...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-19
...) from construction, operation, maintenance, and decommissioning associated with the Buckeye Wind Power... construction, operation, maintenance, and decommissioning of the project. The project consists of a 100-turbine... Draft Programmatic Agreement, Buckeye Wind Power Project, Champaign County, Ohio AGENCY: Fish and...
9th Annual CMMI Technology Conference and User Group-Tuesday
2009-11-19
evaluating and quantifying risk likelihood and severity risks. Step 4 Project defines thresholds for each risk category. Step 5 Project defines bounds on the...defines consistent criteria for evaluating and quantifying risk likelihood and severity risks in the Risk Management Plan. Step 4 Project defines
23 CFR 630.1012 - Project-level procedures.
Code of Federal Regulations, 2014 CFR
2014-04-01
... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1012 Project-level procedures. (a) This section provides guidance and establishes procedures for States to manage the work zone impacts of individual projects. (b) Transportation Management Plan (TMP). A TMP consists of strategies to manage the work zone...
23 CFR 630.1012 - Project-level procedures.
Code of Federal Regulations, 2013 CFR
2013-04-01
... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1012 Project-level procedures. (a) This section provides guidance and establishes procedures for States to manage the work zone impacts of individual projects. (b) Transportation Management Plan (TMP). A TMP consists of strategies to manage the work zone...
23 CFR 630.1012 - Project-level procedures.
Code of Federal Regulations, 2012 CFR
2012-04-01
... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1012 Project-level procedures. (a) This section provides guidance and establishes procedures for States to manage the work zone impacts of individual projects. (b) Transportation Management Plan (TMP). A TMP consists of strategies to manage the work zone...
23 CFR 630.1012 - Project-level procedures.
Code of Federal Regulations, 2011 CFR
2011-04-01
... PRECONSTRUCTION PROCEDURES Work Zone Safety and Mobility § 630.1012 Project-level procedures. (a) This section provides guidance and establishes procedures for States to manage the work zone impacts of individual projects. (b) Transportation Management Plan (TMP). A TMP consists of strategies to manage the work zone...
ERIC Educational Resources Information Center
Kapor, Mitchell
2005-01-01
Open source software projects involve the production of goods, but in software projects, the "goods" consist of information. The open source model is an alternative to the conventional centralized, command-and-control way in which things are usually made. In contrast, open source projects are genuinely decentralized and transparent. Transparent…
Project Sell, Title VII: Final Evaluation 1970-1971.
ERIC Educational Resources Information Center
Condon, Elaine C.; And Others
This evaluative report consists of two parts. The first is a narrative report which represents a summary by the evaluation team and recommendations regarding project activities; the second part provides a statistical analysis of project achievements. Details are provided on evaluation techniques, staff, management, instructional materials,…
77 FR 44579 - Siskiyou County Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-30
... Community Self-Determination Act (Pub. L. 110-343) (the Act) and operates in compliance with the Federal... provide advice and recommendations to the Forest Service concerning projects and funding consistent with... committee to hear project status, review project proposals and to vote and make recommendations. The meeting...
A model to calculate consistent atmospheric emission projections and its application to Spain
NASA Astrophysics Data System (ADS)
Lumbreras, Julio; Borge, Rafael; de Andrés, Juan Manuel; Rodríguez, Encarnación
Global warming and air quality are headline environmental issues of our time and policy must preempt negative international effects with forward-looking strategies. As part of the revision of the European National Emission Ceilings Directive, atmospheric emission projections for European Union countries are being calculated. These projections are useful to drive European air quality analyses and to support wide-scale decision-making. However, when evaluating specific policies and measures at sectoral level, a more detailed approach is needed. This paper presents an original methodology to evaluate emission projections. Emission projections are calculated for each emitting activity that has emissions under three scenarios: without measures (business as usual), with measures (baseline) and with additional measures (target). The methodology developed allows the estimation of highly disaggregated multi-pollutant, consistent emissions for a whole country or region. In order to assure consistency with past emissions included in atmospheric emission inventories and coherence among the individual activities, the consistent emission projection (CEP) model incorporates harmonization and integration criteria as well as quality assurance/quality check (QA/QC) procedures. This study includes a sensitivity analysis as a first approach to uncertainty evaluation. The aim of the model presented in this contribution is to support decision-making process through the assessment of future emission scenarios taking into account the effect of different detailed technical and non-technical measures and it may also constitute the basis for air quality modelling. The system is designed to produce the information and formats related to international reporting requirements and it allows performing a comparison of national results with lower resolution models such as RAINS/GAINS. The methodology has been successfully applied and tested to evaluate Spanish emission projections up to 2020 for 26 pollutants but the methodology could be adopted for any particular region for different purposes, especially for European countries.
ICLUS is a project for developing scenarios broadly consistent with global-scale, peer-reviewed storylines of population growth and economic development, which are used by climate change modelers to develop projections of future climate.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-06
.... e. Name of Project: Troy Hydroelectric Project. f. Location: On the Missisquoi River, in the Town of Troy, Orleans County, Vermont. The project would not occupy lands of the United States. g. Filed... application is not ready for environmental analysis at this time. n. The Troy Project would consist of: (1...
ERIC Educational Resources Information Center
Himes, John H.; And Others
The Lawrence (Massachusetts) Children's Health Project (LCHP) was a demonstration project consisting of an alternative approach to providing health care to children, many of whom were not receiving health services. The project was carried out by the Merrimack Education Center and focused on a school-based model for Early Periodic Screening,…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-27
... Lake Tahoe Passenger Ferry Project, Placer and El Dorado Counties and City of South Lake Tahoe... Statement (EIS) for the proposed Lake Tahoe Passenger Ferry Project. The project consists of a cross- lake ferry service with a South Shore Ferry Terminal at the Ski Run Marina in South Lake Tahoe, El Dorado...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
... McCoy Solar Energy Project (MSEP), a photovoltaic solar electricity generation project. The Secretary of... proposed would have consisted of an up to 750-megawatt photovoltaic solar energy generation facility and....LVRWB09B2510.FX0000] Notice of Availability of the Record of Decision for the McCoy Solar Energy Project...
Astro tourism: Astro Izery project
NASA Astrophysics Data System (ADS)
Mrozek, Tomasz; Kołomański, Sylwester; Żakowicz, Grzegorz; Kornafel, Stanisław; Czarnecki, Tomasz L.; Suchan, Pavel; Kamiński, Zbigniew
2015-03-01
The Astro Izery project is carried by several institutions from Poland and Czech Republic. Its aim is to educate and inform tourists, who visit the Izery Mountains, about astronomy and light pollution. The project consists of two activities: permanent (sundials, planetary path etc.) and periodic (meetings, workshops). After five years the project is in good health and will gain more elements in next years.
Alpena Community College Workplace Partnership Project. Final Report.
ERIC Educational Resources Information Center
Alpena Community Coll., MI.
This document consists of materials produced during the Workplace Partnership Project (WPP), a National Workplace Literacy Program-funded workplace literacy partnership between Alpena Community College (ACC) in Alpena, Michigan, and area businesses. Presented first is a personal reflection in which the project director shares some of the lessons…
76 FR 15970 - Central Ferry to Lower Monumental 500-kilovolt Transmission Line Project
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-22
...-kilovolt Transmission Line Project AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE... Project in Garfield, Columbia, and Walla Walla counties, Washington. BPA has decided to implement the... consists of constructing a new 500-kV single- circuit transmission line from BPA's new Central Ferry...
76 FR 54732 - Eleven Point Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-02
... recommendations to the Forest Service concerning projects and funding consistent with the title II of the Act. The meeting is open to the public. The purpose of the meeting is review proposed forest management projects so... further information. SUPPLEMENTARY INFORMATION: The following business will be conducted: Two projects...
Contemporary India. Fulbright Summer Abroad Program 1987. Curriculum Project.
ERIC Educational Resources Information Center
Kneedler, Peter E.
Consisting of an audio-visual series and study exercises for cooperative, interdependent learning opportunities, this curriculum project is designed to provide in-depth learning and to develop positive attitudes about India in junior high school students. The project can also be used to influence curriculum development and to acquaint teachers…
Science Explorers Translation Project.
ERIC Educational Resources Information Center
Jacobs, Dolores
This paper describes a pilot project of Los Alamos National Laboratory (New Mexico) to translate a science education curriculum for junior and senior high school students into Navajo. The project consisted of translating a video, a teacher's guide, and an interactive multimedia product on the 1993 hantavirus outbreak in the Four Corners area…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-07
...: The proposed Three Sisters Irrigation District Hydroelectric Project would be located on the north pipe of the Three Sisters Irrigation District's Main Canal Pipeline in Deschutes County, Oregon. The... of Project: The Three Sisters Irrigation District Hydroelectric Project would consist of: (1) An...
Step Ahead: A Partnership for Improved Health Care Communication.
ERIC Educational Resources Information Center
Bernhardt, Stephen A., Comp.; Meyer, Paul R., Comp.
This publication consists of materials produced by Step Ahead, a National Workplace Literacy Demonstration Project--a partnership between New Mexico State University and Memorial Medical Center, Las Cruces, New Mexico. The project abstract is a one-page summary of facts, objectives, and procedures related to this project, which provided onsite…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-14
...). d. Name of Project: Microturbine Hydrokinetic River-In-Stream Energy Conversion Power Project (also.... Selvaggio, Whitestone Power and Communications, P.O. Box 1630, Delta Junction, Alaska 99737; (907) 895- 4938...: The proposed Microturbine Hydrokinetic River-In-Stream Energy Conversion Power Project would consist...
EARLY TRAINING PROJECT. INTERIM REPORT.
ERIC Educational Resources Information Center
GRAY, SUSAN W.; KLAUS, RUPERT A.
THE EARLY TRAINING PROJECT ATTEMPTED TO IMPROVE THE INTELLECTUAL FUNCTIONING AND PERSONAL ADJUSTMENT OF CULTURALLY DISADVANTAGED CHILDREN THROUGH SPECIAL EXPERIENCES IN THE 15- OR 24-MONTHS PRECEDING FIRST GRADE AND IN THE FIRST YEAR OF SCHOOL. THE PROCEDURES OF THE PROJECT CONSISTED OF TWO TRAINING SEQUENCES. THE FIRST SEQUENCE INVOLVED TWO…
Fuels Products of the LANDFIRE Project
Matthew C. Reeves; Jay R. Kost; Kevin C. Ryan
2006-01-01
The LANDFIRE project is a collaborative interagency effort designed to provide seamless, nationally consistent, locally relevant geographic information systems (GIS) data layers depicting wildland fuels, vegetation and fire regime characteristics. The LANDFIRE project is the first of its kind and offers new opportunity for fire management and research activities. Here...
78 FR 28841 - Quartzsite Solar Energy Project Record of Decision (DOE/EIS-0440)
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-16
... proposed Project would contain the central receiver or tower, a solar field consisting of mirrors or... DEPARTMENT OF ENERGY Western Area Power Administration Quartzsite Solar Energy Project Record of...), received a request from Quartzsite Solar Energy, LLC (QSE) to interconnect its proposed Quartzsite Solar...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-30
... civics to strengthen their knowledge of, and preparation for, teaching these subjects. The Congressional... the teaching of history. We seek this waiver and extension of project period in order to enable each... Congressional Academies projects are relatively small, with defined intervention strategies consisting of summer...
PREFACE TO SPECIAL SECTION: SOUTHERN OXIDANTS STUDY 1999 ATLANTA SUPERSITE PROJECT (SOS3)
The Atlanta Supersites Project consisted of a one-month intensive field program to compare advanced methods for measurement of PM2.5 mass, chemical composition, including single particle composition in real-time, and aerosol precursor species. The project was the first of EPA's ...
Project SIDE. Performance Report. 1992-1993.
ERIC Educational Resources Information Center
Alabama Southern Community Coll., Monroeville.
This document consists of the performance report and evaluation report of the second funding of Project SIDE, a workplace literacy project at Alabama Southern Community College (ASCC). The performance report contains the following: a list of the industrial partners; basic skills framework; chronological listing by company of courses offered;…
Projected climate impacts for the amphibians of the western hemisphere
Lawler, Joshua J.; Shafer, Sarah L.; Bancroft, Betsy A.; Blaustein, Andrew R.
2010-01-01
Given their physiological requirements, limited dispersal abilities, and hydrologically sensitive habitats, amphibians are likely to be highly sensitive to future climatic changes. We used three approaches to map areas in the western hemisphere where amphibians are particularly likely to be affected by climate change. First, we used bioclimatic models to project potential climate-driven shifts in the distribution of 413 amphibian species based on 20 climate simulations for 2071–2100. We summarized these projections to produce estimates of species turnover. Second, we mapped the distribution of 1099 species with restricted geographic ranges. Finally, using the 20 future climate-change simulations, we mapped areas that were consistently projected to receive less seasonal precipitation in the coming century and thus were likely to have altered microclimates and local hydrologies. Species turnover was projected to be highest in the Andes Mountains and parts of Central America and Mexico, where, on average, turnover rates exceeded 60% under the lower of two emissions scenarios. Many of the restricted-range species not included in our range-shift analyses were concentrated in parts of the Andes and Central America and in Brazil's Atlantic Forest. Much of Central America, southwestern North America, and parts of South America were consistently projected to experience decreased precipitation by the end of the century. Combining the results of the three analyses highlighted several areas in which amphibians are likely to be significantly affected by climate change for multiple reasons. Portions of southern Central America were simultaneously projected to experience high species turnover, have many additional restricted-range species, and were consistently projected to receive less precipitation. Together, our three analyses form one potential assessment of the geographic vulnerability of amphibians to climate change and as such provide broad-scale guidance for directing conservation efforts.
Projected climate impacts for the amphibians of the Western hemisphere.
Lawler, Joshua J; Shafer, Sarah L; Bancroft, Betsy A; Blaustein, Andrew R
2010-02-01
Given their physiological requirements, limited dispersal abilities, and hydrologically sensitive habitats, amphibians are likely to be highly sensitive to future climatic changes. We used three approaches to map areas in the western hemisphere where amphibians are particularly likely to be affected by climate change. First, we used bioclimatic models to project potential climate-driven shifts in the distribution of 413 amphibian species based on 20 climate simulations for 2071-2100. We summarized these projections to produce estimates of species turnover. Second, we mapped the distribution of 1099 species with restricted geographic ranges. Finally, using the 20 future climate-change simulations, we mapped areas that were consistently projected to receive less seasonal precipitation in the coming century and thus were likely to have altered microclimates and local hydrologies. Species turnover was projected to be highest in the Andes Mountains and parts of Central America and Mexico, where, on average, turnover rates exceeded 60% under the lower of two emissions scenarios. Many of the restricted-range species not included in our range-shift analyses were concentrated in parts of the Andes and Central America and in Brazil's Atlantic Forest. Much of Central America, southwestern North America, and parts of South America were consistently projected to experience decreased precipitation by the end of the century. Combining the results of the three analyses highlighted several areas in which amphibians are likely to be significantly affected by climate change for multiple reasons. Portions of southern Central America were simultaneously projected to experience high species turnover, have many additional restricted-range species, and were consistently projected to receive less precipitation. Together, our three analyses form one potential assessment of the geographic vulnerability of amphibians to climate change and as such provide broad-scale guidance for directing conservation efforts.
Impact of an HIV prevention intervention on condom use among long distance truckers in India.
Juneja, Sachin; Rao Tirumalasetti, Vasudha; Mishra, Ram Manohar; Sethu, Shekhar; Singh, Indra Ramyash
2013-03-01
This paper examines the impact of three components of an HIV prevention program (mid-media, interpersonal communication, and project-run clinics) on consistent condom use by long distance truckers with paid and non-paid female partners in India. Data from 2,723 long distance truckers were analyzed using the propensity score matching approach. Based on utilization of services, the following categories of intervention exposure were derived: no exposure, exposure only to mid-media, exposure only to mid-media and interpersonal communication, exposure only to mid-media and project-run clinics, and exposure to all three intervention components. Compared to those who were not exposed to any intervention, exposure to mid-media alone increased consistent condom use with paid female partners by about ten percent. Exposure to mid-media and visits to project-run clinics increased consistent condom use with non-paid female partners by 26 %. These findings suggest that mid-media events and clinics were the most effective package of services to increase consistent condom use among the long distance truckers.
ERIC Educational Resources Information Center
Exotech Systems, Inc., Falls Church, VA.
Volume IV of the evaluation report consists of case studies from 10 migrant education projects in 8 of the sample States. These projects were visited in July through September 1973. The case studies give noteworthy or innovative aspects of the projects, detailed descriptions, and the functions. The projects are: (1) Harnett County Summer Migrant…
Materials Processes (MP) Engineering Internship Projects
NASA Technical Reports Server (NTRS)
Tomsik, Elizabeth
2017-01-01
This poster illustrates my major and minor projects worked on during my entire time interning at KSC in the Materials Science Branch. My major projects consist of three Failure Analyses, a research project on Magnesium Alloys, and the manufacturing and mechanical testing of the Advanced Plant Habitat. My three Failure Analyses are Umbilical Testing Ground Plates, Lithium Ion Battery Locking Spring Blade, and a Liquid Oxygen Poppet.
McCarley, Renay Marie; Dowling, Donna A; Dolansky, Mary A; Bieda, Amy
2018-03-01
The global aim of this quality improvement project was to develop and implement a systematic process to assign and maintain consistent bedside nurses for infants and families. A systematic process based on a primary care nursing model was implemented to assign consistent care for a 48-bed, single-family room NICU. Four PDSA cycles were necessary to obtain agreement from the nursing staff as to the best process for assigning primary nurses. Post-intervention data revealed a 9.5 percent decrease of consistent caregivers for infants in the NICU ≤ 28 days and a 2.3 percent increase of consistent caregivers for infants in the NICU ≥ 29 days. Although these findings did not meet the goal of the specific aim, a systematic process was created to assign bedside nurses to infants. Further PDSAs will be needed to refine the process to reach the aim.
Evaluation Guidelines for Service and Methods Demonstration Projects
DOT National Transportation Integrated Search
1976-02-01
The document consists of evaluation guidelines for planning, implementing, and reporting the findings of the evaluation of Service and Methods Demonstration (SMD) projects sponsored by the Urban Mass Transportation Administration (UMTA). The objectiv...
Improving concrete overlay construction.
DOT National Transportation Integrated Search
2010-03-01
Several road construction projects involving concrete overlays at the state and county levels in Iowa in 2009 were studied for : construction techniques and methods. The projects that were evaluated consisted of sites in four Iowa counties: Osceola, ...
Tennessee long-range transportation plan : project evaluation system
DOT National Transportation Integrated Search
2005-12-01
The Project Evaluation System (PES) Report is an analytical methodology to aid programming efforts and prioritize multimodal investments. The methodology consists of both quantitative and qualitative evaluation criteria built upon the Guiding Princip...
77 FR 29624 - Cheniere Creole Trail Pipeline, L.P.; Notice of Application
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... Creole Trail Pipeline, L.P.; Notice of Application Take notice that on April 30, 2012, Cheniere Creole Trail Pipeline, L.P. (Cheniere), 700 Milam, Suite 800, Houston, TX 77002, filed an application in Docket... Creole Trail Expansion Project (Project). Cheniere's Project would consist of construction of a new 53...
ERIC Educational Resources Information Center
National Inst. for Work and Learning, Washington, DC.
Three demonstration projects were conducted to determine if worker attitudes toward and participation in employer- or union-sponsored tuition assistance (TA) programs could be favorably influenced by information dissemination, counseling, and links to area educational institutions. Model I consisted only of information dissemination about the…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... Shoreline Management Project, on Figure Eight Island, New Hanover County, NC AGENCY: Department of the Army....html , under Figure Eight Island Inlet and Shoreline Management Project. FOR FURTHER INFORMATION... Carolina Division of Coastal Management (DCM) to insure the projects consistency with the Coastal Zone...
ERIC Educational Resources Information Center
Kim, Nanyoung
2009-01-01
This article describes a name design project. The project is one way to teach how repetition makes a composition look harmonious and pleasing without even saying the word, and introduce the concept of "style" that can later be expanded to appreciating different styles of artworks. The main part of the project consists of drawing the chosen design,…
Project Planning and Reporting
NASA Technical Reports Server (NTRS)
1982-01-01
Project Planning Analysis and Reporting System (PPARS) is automated aid in monitoring and scheduling of activities within project. PPARS system consists of PPARS Batch Program, five preprocessor programs, and two post-processor programs. PPARS Batch program is full CPM (Critical Path Method) scheduling program with resource capabilities. Can process networks with up to 10,000 activities.
Psychology on Computers: Simulations, Experiments and Projects.
ERIC Educational Resources Information Center
Belcher, Duane M.; Smith, Stephen D.
PSYCOM is a unique mixed media package which combines high interest projects on the computer with a written text of expository material. It goes beyond most computer-assisted instruction which emphasizes drill and practice and testing of knowledge. A project might consist of a simulation or an actual experiment, or it might be a demonstration, a…
75 FR 2138 - Interconnection of the Proposed Hermosa West Wind Farm Project, Wyoming (DOE/EIS-0438)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-14
... SWE's proposed Project would consist of up to 200 wind turbine generators with a combined total... siting process for the wind turbine strings and associated facilities considered sensitive resources, and... West Wind Farm Project, Wyoming (DOE/EIS-0438) AGENCY: Western Area Power Administration, DOE. ACTION...
Probabilistic approach to long range planning of manpower
NASA Technical Reports Server (NTRS)
Lejk, R. A.
1967-01-01
Publication presents a total long range planning model for project oriented organizations. The total model consists of planning systems which originate - /1/ at the project level and consolidate into an overall plan, and /2/ from a budetary ceiling and allocate to the individual projects. Analysis of /1/ and /2/ is provided for management decision making.
Fulbright Hays Summer Seminars Abroad Program, 1988. Curriculum Projects.
ERIC Educational Resources Information Center
National Committee on United States-China Relations, New York, NY.
This document consists of a collection of 18 curriculum projects created by U.S. teachers after visiting China during 1988. The projects cover a variety of topics concerning China: "Chinese Living Environments" (R. Stumpe Brent); "China as a Model of a Mixed Economy in a Developing Nation" (G. Caressi); "Images of…
Language Arts Project: Radio Program Production.
ERIC Educational Resources Information Center
Staskal, Doreen
A project in which student groups create a 10-minute radio broadcast consisting of a song, commercials, a news report, and a commentary is presented. The purpose of the project is to teach students to be selective media users while also teaching reading, writing, listening, and speaking skills. The teacher introduction offers suggestions for…
Rural Textile Workers Literacy Enhancement Project. Final Performance Report.
ERIC Educational Resources Information Center
Enterprise State Junior Coll., AL.
This document consists of the final report and sample curricula from the Rural Textile Workers Literacy Enhancement Project. The final report details how the project was initiated in April 1993 to help employees of five textile and apparel manufacturing companies in southeastern Alabama improve their literacy and numeracy skills. A second…
34 CFR 379.30 - What selection criteria does the Secretary use under this program?
Code of Federal Regulations, 2013 CFR
2013-07-01
... analysis or needs assessment must be consistent with the current and projected local employment...) Extent of need for project (20 points). The Secretary reviews each application to determine the extent to which the project meets demonstrated needs. The Secretary looks for evidence that— (i) The applicant has...
34 CFR 379.30 - What selection criteria does the Secretary use under this program?
Code of Federal Regulations, 2012 CFR
2012-07-01
... analysis or needs assessment must be consistent with the current and projected local employment...) Extent of need for project (20 points). The Secretary reviews each application to determine the extent to which the project meets demonstrated needs. The Secretary looks for evidence that— (i) The applicant has...
34 CFR 379.30 - What selection criteria does the Secretary use under this program?
Code of Federal Regulations, 2014 CFR
2014-07-01
... analysis or needs assessment must be consistent with the current and projected local employment...) Extent of need for project (20 points). The Secretary reviews each application to determine the extent to which the project meets demonstrated needs. The Secretary looks for evidence that— (i) The applicant has...
International Group Heterogeneity and Students' Business Project Achievement
ERIC Educational Resources Information Center
Ding, Ning; Bosker, Roel J.; Xu, Xiaoyan; Rugers, Lucie; van Heugten, Petra PAM
2015-01-01
In business higher education, group project work plays an essential role. The purpose of the present study is to explore the relationship between the group heterogeneity of students' business project groups and their academic achievements at both group and individual levels. The sample consists of 536 freshmen from an International Business School…
The Choctaw Home-Centered Family Education Demonstration Project. Final Report.
ERIC Educational Resources Information Center
Quigley, Patrick A.; And Others
The final report of the four-year (1972-1976) Choctaw Family Education Project identifies the major goal, "to demonstrate a workable early childhood model for rural reservation groups," and consists of an executive summary, a comprehensive report, and a personalized report. Objectives of the project, carried out in 6 Choctaw reservation…
Sex Differences in Objective and Projective Dependency Tests: A Meta-Analytic Review.
ERIC Educational Resources Information Center
Bornstein, Robert F.
1995-01-01
A meta-analysis of 97 studies published since 1950 that assessed sex differences in scores on objective and projective dependency tests indicated that women consistently obtained higher dependency scores on objective tests, and men obtained higher scores on projective tests. Findings are discussed in terms of sex role socialization. (SLD)
The Los Alamos universe: Using multimedia to promote laboratory capabilities
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kindel, J.
2000-03-01
This project consists of a multimedia presentation that explains the technological capabilities of Los Alamos National Laboratory. It takes the form of a human-computer interface built around the metaphor of the universe. The project is intended promote Laboratory capabilities to a wide audience. Multimedia is simply a means of communicating information through a diverse set of tools--be they text, sound, animation, video, etc. Likewise, Los Alamos National Laboratory is a collection of diverse technologies, projects, and people. Given the ample material available at the Laboratory, there are tangible benefits to be gained by communicating across media. This paper consists ofmore » three parts. The first section provides some basic information about the Laboratory, its mission, and its needs. The second section introduces this multimedia presentation and the metaphor it is based on along with some basic concepts of color and user interaction used in the building of this project. The final section covers construction of the project, pitfalls, and future improvements.« less
The Inter-Sectoral Impact Model Intercomparison Project (ISI–MIP): Project framework
Warszawski, Lila; Frieler, Katja; Huber, Veronika; Piontek, Franziska; Serdeczny, Olivia; Schewe, Jacob
2014-01-01
The Inter-Sectoral Impact Model Intercomparison Project offers a framework to compare climate impact projections in different sectors and at different scales. Consistent climate and socio-economic input data provide the basis for a cross-sectoral integration of impact projections. The project is designed to enable quantitative synthesis of climate change impacts at different levels of global warming. This report briefly outlines the objectives and framework of the first, fast-tracked phase of Inter-Sectoral Impact Model Intercomparison Project, based on global impact models, and provides an overview of the participating models, input data, and scenario set-up. PMID:24344316
Performance of Recycled Hot Mix Asphalt Mixtures
DOT National Transportation Integrated Search
1995-05-01
This research project was undertaken to evaluate the performance of recycled pavements in comparison to virgin (control) asphalt pavements. Five projects, each consisting of a recycled section and a control section, were subjected to detailed evaluat...
MULTIPLE CONTAMINANTS CASE STUDIES
The presentation provides information taken from the arsenic demonstration program projects that have treatment systems removing multiply contaminants from drinking water. The case studies sited in the presentation consist of projects that have arsenic along with either nitrate, ...
Geospace exploration project: Arase (ERG)
NASA Astrophysics Data System (ADS)
Miyoshi, Y.; Kasaba, Y.; Shinohara, I.; Takashima, T.; Asamura, K.; Matsumoto, H.; Higashio, N.; Mitani, T.; Kasahara, S.; Yokota, S.; Wang, S.; Kazama, Y.; Kasahara, Y.; Yagitani, S.; Matsuoka, A.; Kojima, H.; Katoh, Y.; Shiokawa, K.; Seki, K.; Fujimoto, M.; Ono, T.; ERG project Group
2017-06-01
The ERG (Exploration of energization and Radiation in Geospace) is Japanese geospace exploration project. The project focuses on relativistic electron acceleration mechanism of the outer belt and dynamics of space storms in the context of the cross-energy coupling via wave-particle interactions. The project consists of the satellite observation team, the ground-based network observation team, and integrated-data analysis/simulation team. The satellite was launched on December 20 2016 and has been nicknamed, “Arase”. This paper describes overview of the project and future plan for observations.
Machine translation project alternatives analysis
NASA Technical Reports Server (NTRS)
Bajis, Catherine J.; Bedford, Denise A. D.
1993-01-01
The Machine Translation Project consists of several components, two of which, the Project Plan and the Requirements Analysis, have already been delivered. The Project Plan details the overall rationale, objectives and time-table for the project as a whole. The Requirements Analysis compares a number of available machine translation systems, their capabilities, possible configurations, and costs. The Alternatives Analysis has resulted in a number of conclusions and recommendations to the NASA STI program concerning the acquisition of specific MT systems and related hardware and software.
NASA Technical Reports Server (NTRS)
Spinhirne, J. D.; Welton, E. J.; Campbell, J. R.; Berkoff, T. A.; Starr, David OC. (Technical Monitor)
2002-01-01
The NASA MPL-net project goal is consistent data products of the vertical distribution of clouds and aerosol from globally distributed lidar observation sites. The four ARM micro pulse lidars are a basis of the network to consist of over twelve sites. The science objective is ground truth for global satellite retrievals and accurate vertical distribution information in combination with surface radiation measurements for aerosol and cloud models. The project involves improvement in instruments and data processing and cooperation with ARM and other partners.
Evaluation of a primary school drug drama project: methodological issues and key findings.
Starkey, F; Orme, J
2001-10-01
This paper describes the impact evaluation of a primary school drug drama project developed by a health promotion service and a theatre's education department in England. The project targeted 10-11 year olds in 41 schools with an interactive drama production and workshop day on attitudes, choices, decisions and risks of alcohol, tobacco and illegal drug use. Parents were also involved in parents' evenings and watching children's performances. The research consisted of both process evaluation, consultation with pupils, teachers, parents, actors and health promotion staff on the project itself, and impact evaluation which looked at potential changes in children's knowledge, attitudes and decision-making skills. This paper reports findings of the impact evaluation, from six of the schools participating in the project. The impact evaluation consisted of pre- and post-project testing using a 'draw and write' and a problem-solving exercise. These findings suggest that the project had a significant impact on the children's knowledge of names of specific illegal drugs, and on their awareness that alcohol and cigarettes were also drugs, and secondly encouraged the children to think in less stereotypical terms about drugs and drug users. The problem-solving exercise, involving decision-making scenarios, showed small but positive trends between pre- and post-project solutions in more than half of the response categories. Methodological difficulties relating to evaluating such a project are discussed.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-26
.... Date filed: June 10, 2013. d. Applicant: Gresham Municipal Utilities. e. Name of Project: Upper Red Lake Dam Hydroelectric Project. f. Location: On Red River in Shawano County, Wisconsin. No federal... analysis at this time. n. The Upper Red Lake Dam Hydroelectric Project would consist of the following...
The National Council on Crime and Delinquency NewGate Resource Center. Final Report.
ERIC Educational Resources Information Center
Herron, Rex; Muir, John
The origin and development of Project NewGate are described from 1971-74. (The project presents a model program of higher education for incarcerated offenders, consisting of the in-prison phase, transitional phase, and release phase.) Specific project characteristics are discussed and include a 4-year academic program for prison inmates; an…
Area Fish and Game Ecology [Sahuarita High School Career Curriculum Project.
ERIC Educational Resources Information Center
Esser, Robert
This course entitled "Area Fish and Game Ecology" is one of a series of instructional guides prepared by teachers for the Sahuarita High School (Arizona) Career Curriculum Project. It consists of nine units of study, and 18 behavioral objectives relating to these units are stated. The topics covered include map projections, map symbols and…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-24
... Supply Creek Hydroelectric Project. f. Location: The proposed Water Supply Creek Hydroelectric Project will be located on Water Supply Creek, near the town of Hoonah on Chichagof Island, Alaska, affecting T... proposed run-of-river Water Supply Creek Hydroelectric Project will consist of: (1) A proposed 8-foot- high...
A Work Specific Curriculum Project. Special 353 Demonstration Project in Adult Education.
ERIC Educational Resources Information Center
Auburn Univ., AL. Dept. of Vocational and Adult Education.
This document contains samples of work specific curricula for the basic level (I) and advanced level (II) of the safety section of the Auburn University (Alabama) Demonstration project in adult education. The samples consist of instructor manuals and student books. Content of each instructor manual--one for level I and another for level…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-29
.... 13777-000] Lock Hydro Friends Fund XLI; Allegheny 7 Hydro, LLC; Notice of Competing Preliminary Permit..., 2010, Lock Hydro Friends Fund XLI, and Allegheny 7 Hydro, LLC filed applications, pursuant to section 4.... 7 Projects Lock Hydro Friends Fund XLI's project (Project No. 13736-000) would consist of: (1) Two...
Enhancing the Effectiveness of Carbon Dioxide Flooding by Managing Asphaltene Precipitation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Deo, Milind D.
2002-02-21
This project was undertaken to understand fundamental aspects of carbon dioxide (CO2) induced asphaltene precipitation. Oil and asphaltene samples from the Rangely field in Colorado were used for most of the project. The project consisted of pure component and high-pressure, thermodynamic experiments, thermodynamic modeling, kinetic experiments and modeling, targeted corefloods and compositional modeling.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-10
... central receiver or tower, a solar field consisting of mirrors or heliostats to reflect the sun's energy... Environmental Impact Statement for the Proposed Solar Reserve LLC Quartzsite Solar Energy Project, La Paz County... (DEIS) for the proposed Quartzsite Solar Energy Project (Project), in La Paz County, Arizona, and the...
ERIC Educational Resources Information Center
National Committee on United States-China Relations, New York, NY.
This document consists of a collection of curriculum projects created by U.S. teachers after visiting China during 1990. The projects cover 16 topics concerning China: "The Education System in the People's Republic of China" (T. Birney); "What I Want to Know about the People's Republic: Brief Answers to Questions Asked about the…
ERIC Educational Resources Information Center
Johnson, Margaret A.; Steward, Gary Jr.
1997-01-01
Reports on a class project that combined an examination of social class and political power with an introduction to sociological research. The project consisted of compiling biographical profiles of cabinet members from the Ronald Reagan, George Bush, and Bill Clinton administrations. Introduces students to issues of conceptualization,…
Learning Physics through Project-Based Learning Game Techniques
ERIC Educational Resources Information Center
Baran, Medine; Maskan, Abdulkadir; Yasar, Seyma
2018-01-01
The aim of the present study, in which Project and game techniques are used together, is to examine the impact of project-based learning games on students' physics achievement. Participants of the study consist of 34 9th grade students (N = 34). The data were collected using achievement tests and a questionnaire. Throughout the applications, the…
A Multidisciplinary PBL Robot Control Project in Automation and Electronic Engineering
ERIC Educational Resources Information Center
Hassan, Houcine; Domínguez, Carlos; Martínez, Juan-Miguel; Perles, Angel; Capella, Juan-Vicente; Albaladejo, José
2015-01-01
This paper presents a multidisciplinary problem-based learning (PBL) project consisting of the development of a robot arm prototype and the implementation of its control system. The project is carried out as part of Industrial Informatics (II), a compulsory third-year course in the Automation and Electronic Engineering (AEE) degree program at the…
ERIC Educational Resources Information Center
Rodriguez, Felix; Colon, Elsie M.
The Industry-Academia Partnership Pilot Project (IAPPP) was undertaken by Huertas Junior College (HJC), in Caguas, Puerto Rico, to improve advanced technical education, enhance the competitive capabilities of the region, and reduce the region's unemployment rate. The project consisted of three basic components: professional growth opportunities…
The EMCC / DARPA Massively Parallel Electromagnetic Scattering Project
NASA Technical Reports Server (NTRS)
Woo, Alex C.; Hill, Kueichien C.
1996-01-01
The Electromagnetic Code Consortium (EMCC) was sponsored by the Advanced Research Program Agency (ARPA) to demonstrate the effectiveness of massively parallel computing in large scale radar signature predictions. The EMCC/ARPA project consisted of three parts.
I-39 dynamic message sign project summary
DOT National Transportation Integrated Search
2005-01-01
The Illinois Department of Transportation (IDOT) sought to deploy a message sign system consisting of permanently-mounted dynamic message signs around the Rockford metropolitan area. The project goal was to begin building a system of remotely-activat...
29 CFR 4203.4 - Requests for PBGC approval of plan amendments.
Code of Federal Regulations, 2011 CFR
2011-07-01
... mobility of employees, the intermittent nature of employment, the project-by-project nature of the work... consistent pattern of entry and withdrawal by employers, and the local nature of the work performed. (e...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Harvey-Collard, Patrick
2015-10-27
From January 2015 to July 2015, I was doing research at Sandia National Laboratories in Albuquerque, United States. My work there consisted of performing experimental measurements using Sandia’s unique silicon quantum computing platform. The project is about coupling donor spin quantum bits, or qubits, to quantum dots in a silicon nanostructure based on conventional microchip technology. During the project, I devised a new quantum state readout mechanism that allow better, longer lived measurement signals. The measurement (or readout) mechanism is key to any qubit architecture. Next, I was able to demonstrate a quantum manipulation of the two-electron spin states ofmore » the coupled donor and quantum dot system. This constitutes a breakthrough for donor spin qubits in silicon because it could enable larger systems consisting of many qubits. This project will lead to publications in scientific journals, presentations in international conferences, and generates exciting new opportunities for manipulating nature at the nanoscale.« less
Program and Project Management Framework
NASA Technical Reports Server (NTRS)
Butler, Cassandra D.
2002-01-01
The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.
NASA Astrophysics Data System (ADS)
Campbell, J. L.; Burrows, S.; Gower, S. T.; Cohen, W. B.
1999-09-01
The BigFoot Project is funded by the Earth Science Enterprise to collect and organize data to be used in the EOS Validation Program. The data collected by the BigFoot Project are unique in being ground-based observations coincident with satellite overpasses. In addition to collecting data, the BigFoot project will develop and test new algorithms for scaling point measurements to the same spatial scales as the EOS satellite products. This BigFoot Field Manual Mill be used to achieve completeness and consistency of data collected at four initial BigFoot sites and at future sites that may collect similar validation data. Therefore, validation datasets submitted to the ORNL DAAC that have been compiled in a manner consistent with the field manual will be especially valuable in the validation program.
23 CFR 505.9 - Criteria for grants.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Secretary determines, based upon information submitted by the applicant, that the project: (1) Is based on... cost of the project. (3) Emerges from the metropolitan and Statewide planning process, consistent with... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT...
23 CFR 505.9 - Criteria for grants.
Code of Federal Regulations, 2014 CFR
2014-04-01
... Secretary determines, based upon information submitted by the applicant, that the project: (1) Is based on... cost of the project. (3) Emerges from the metropolitan and Statewide planning process, consistent with... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT...
23 CFR 505.9 - Criteria for grants.
Code of Federal Regulations, 2012 CFR
2012-04-01
... Secretary determines, based upon information submitted by the applicant, that the project: (1) Is based on... cost of the project. (3) Emerges from the metropolitan and Statewide planning process, consistent with... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT...
23 CFR 505.9 - Criteria for grants.
Code of Federal Regulations, 2013 CFR
2013-04-01
... Secretary determines, based upon information submitted by the applicant, that the project: (1) Is based on... cost of the project. (3) Emerges from the metropolitan and Statewide planning process, consistent with... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION TRANSPORTATION INFRASTRUCTURE MANAGEMENT...
Washing bridges to reduce chloride : interim report.
DOT National Transportation Integrated Search
2003-12-01
Chloride ions are known to promote the corrosion of steel in reinforced concrete. This project was undertaken to investigate the efficacy of washing, to reduce chloride content and chloride ion uptake. The project consists of a laboratory and a field...
Washing bridges to reduce chloride : final report.
DOT National Transportation Integrated Search
2005-07-01
Chloride ions are known to promote the corrosion of steel in reinforced concrete. This project was undertaken to investigate the efficacy of washing, to reduce existing chloride content and chloride ion uptake. The project consisted of a laboratory c...
24 CFR 92.351 - Affirmative marketing; minority outreach program.
Code of Federal Regulations, 2014 CFR
2014-04-01
... and homebuyer projects containing five or more HOME-assisted housing units. Affirmative marketing...-based rental assistance and downpayment assistance programs. Affirmative marketing steps consist of... disability. If participating jurisdiction's written agreement with the project owner permits the rental...
Crack sealing before overlaying an asphalt concrete surface.
DOT National Transportation Integrated Search
1997-01-01
In an attempt to reduce reflective cracking on overlay projects a study was conducted that : consisted of sealing all transverse cracks greater than inch with hot crack sealers before the : project was resurfaced. The experiment will evaluate the ...
ENVIRONMENTAL QUALITY INFORMATION SYSTEM - EQULS® - ITER
This project consisted of an evaluation of the Environmental Quality Information System (EQuIS) software designed by Earthsoft, Inc. as an environmental data management and analysis platform for monitoring and remediation projects. In consultation with the EQuIS vendor, six pri...
The CHPRC Columbia River Protection Project Quality Assurance Project Plan
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fix, N. J.
Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each projectmore » within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.« less
Evaluation of an Innovative Digital Assessment Tool in Dental Anatomy.
Lam, Matt T; Kwon, So Ran; Qian, Fang; Denehy, Gerald E
2015-05-01
The E4D Compare software is an innovative tool that provides immediate feedback to students' projects and competencies. It should provide consistent scores even when different scanners are used which may have inherent subtle differences in calibration. This study aimed to evaluate potential discrepancies in evaluation using the E4D Compare software based on four different NEVO scanners in dental anatomy projects. Additionally, correlation between digital and visual scores was evaluated. Thirty-five projects of maxillary left central incisors were evaluated. Among these, thirty wax-ups were performed by four operators and five consisted of standard dentoform teeth. Five scores were obtained for each project: one from an instructor that visually graded the project and from four different NEVO scanners. A faculty involved in teaching the dental anatomy course blindly scored the 35 projects. One operator scanned all projects to four NEVO scanners (D4D Technologies, Richardson, TX, USA). The images were aligned to the gold standard, and tolerance set at 0.3 mm to generate a score. The score reflected percentage match between the project and the gold standard. One-way ANOVA with repeated measures was used to determine whether there was a significant difference in scores among the four NEVO scanners. Paired-sample t-test was used to detect any difference between visual scores and the average scores of the four NEVO scanners. Pearson's correlation test was used to assess the relationship between visual and average scores of NEVO scanners. There was no significant difference in mean scores among four different NEVO scanners [F(3, 102) = 2.27, p = 0.0852 one-way ANOVA with repeated measures]. Moreover, the data provided strong evidence that a significant difference existed between visual and digital scores (p = 0.0217; a paired - sample t-test). Mean visual scores were significantly lower than digital scores (72.4 vs 75.1). Pearson's correlation coefficient of 0.85 indicated a strong correlation between visual and digital scores (p < 0.0001). The E4D Compare software provides consistent scores even when different scanners are used and correlates well with visual scores. The use of innovative digital assessment tools in dental education is promising with the E4D Compare software correlating well with visual scores and providing consistent scores even when different scanners are used.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Al-Ayat, R.; Gard, E.; Sketchley, J.
The LDRD annual report for FY2016 consists of two parts: The Overview. This section contains a broad description of the LDRD Program, highlights of recent accomplishments and awards, Program statistics, and the LDRD portfolio-management processes. Project Reports. Project reports are submitted by all principal investigators at the end of the fiscal year. The length and depth of the report depends on the project’s lifecycle. For projects that will be continuing the following year, the principal investigator submits a continuing project report, which is a brief update containing descriptions of the goals, scope, motivation, relevance (to DOE/NNSA and Livermore mission areas),more » and technical progress achieved in FY16, as well as a list of selected publications and presentations that resulted from the research. For projects that concluded in FY16, a more detailed final report is provided that is technical in nature and includes the background, objectives, scientific approach, accomplishments, and impacts on the Laboratory missions, as well as a list of publications and presentations that resulted from the research. Project reports are listed under their research topics and organized by year and type, such as exploratory research (ER), feasibility study (FS), laboratory-wide competition (LW), and strategic initiative (SI). Each project is assigned a unique tracking code, an identifier that consists of three elements. The first is the fiscal year in which the project began, the second represents the project type, and the third identifies the serial number of the project for that fiscal year. For example, 16-ERD-100 means the project is an exploratory research project that began in FY16. The three-digit number (100) represents the serial number for the project.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
...: public improvements construction and square development. Public improvements construction consists of... configuration, and pedestrian amenities. Square development consists of design and construction of development projects primarily on city blocks, known as squares, within the Development Area. These development...
Code of Federal Regulations, 2014 CFR
2014-07-01
...: public improvements construction and square development. Public improvements construction consists of... configuration, and pedestrian amenities. Square development consists of design and construction of development projects primarily on city blocks, known as squares, within the Development Area. These development...
Code of Federal Regulations, 2012 CFR
2012-07-01
...: public improvements construction and square development. Public improvements construction consists of... configuration, and pedestrian amenities. Square development consists of design and construction of development projects primarily on city blocks, known as squares, within the Development Area. These development...
Code of Federal Regulations, 2011 CFR
2011-07-01
...: public improvements construction and square development. Public improvements construction consists of... configuration, and pedestrian amenities. Square development consists of design and construction of development projects primarily on city blocks, known as squares, within the Development Area. These development...
The End-to-end Demonstrator for improved decision making in the water sector in Europe (EDgE)
NASA Astrophysics Data System (ADS)
Wood, Eric; Wanders, Niko; Pan, Ming; Sheffield, Justin; Samaniego, Luis; Thober, Stephan; Kumar, Rohinni; Prudhomme, Christel; Houghton-Carr, Helen
2017-04-01
High-resolution simulations of water resources from hydrological models are vital to supporting important climate services. Apart from a high level of detail, both spatially and temporally, it is important to provide simulations that consistently cover a range of timescales, from historical reanalysis to seasonal forecast and future projections. In the new EDgE project commissioned by the ECMWF (C3S) we try to fulfill these requirements. EDgE is a proof-of-concept project which combines climate data and state-of-the-art hydrological modelling to demonstrate a water-oriented information system implemented through a web application. EDgE is working with key European stakeholders representative of private and public sectors to jointly develop and tailor approaches and techniques. With these tools, stakeholders are assisted in using improved climate information in decision-making, and supported in the development of climate change adaptation and mitigation policies. Here, we present the first results of the EDgE modelling chain, which is divided into three main processes: 1) pre-processing and downscaling; 2) hydrological modelling; 3) post-processing. Consistent downscaling and bias corrections for historical simulations, seasonal forecasts and climate projections ensure that the results across scales are robust. The daily temporal resolution and 5km spatial resolution ensure locally relevant simulations. With the use of four hydrological models (PCR-GLOBWB, VIC, mHM, Noah-MP), uncertainty between models is properly addressed, while consistency is guaranteed by using identical input data for static land surface parameterizations. The forecast results are communicated to stakeholders via Sectoral Climate Impact Indicators (SCIIs) that have been created in collaboration with the end-user community of the EDgE project. The final product of this project is composed of 15 years of seasonal forecast and 10 climate change projections, all combined with four hydrological models. These unique high-resolution climate information simulations in the EDgE project provide an unprecedented information system for decision-making over Europe.
Carbon Nanotubules: Building Blocks for Nanometer-Scale Engineering
NASA Technical Reports Server (NTRS)
Sinnott, Susan B.
1999-01-01
The proposed work consisted of two projects: the investigation of fluid permeation and diffusion through ultrafiltration membranes composed of carbon nanotubules and the design and study of molecular transistors composed of nanotubules. I will outline the progress made on each project and also discuss additional projects, one of which is a continuation of work supported by an 1995-1996 NASA Ames Computer grant.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-15
... application N-85801. The proposed solar energy project would consist of photovoltaic (PV) panels and related... Project and authorized ROW N-85077 for the construction and operation of a 50 MW PV solar energy facility... the Proposed Silver State Solar South Project in Clark County Near Primm, NV AGENCY: Bureau of Land...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This document consists of a list of projects supporting work on oil recovery programs. A publications list and index of companies and institutions is provided. The remaining portion of the document provides brief descriptions on projects in chemical flooding, gas displacement, thermal recovery, geoscience, resource assessment, and reservoir class field demonstrations.
U.S. Outdoor Recreation Participation Projections to 2060
J.M. Bowker; Ashley Askew
2012-01-01
In this chapter, we develop and present national outdoor recreation participation projections for 17 recreation activities or activity composites through 2060. (The projections are for the population of Americans age 16 and older, referred to hereafter in this section as âadults.â) This charge is consistent with the Forest and Rangeland Renewable Resources Planning Act...
ERIC Educational Resources Information Center
Reid, Kenneth J.; Feldhaus, Charles R.
2007-01-01
The implementation of pre-engineering, standard curricula in K-12 schools is growing at a rapid pace. One such curriculum model, Project Lead the Way, consists of six standardized courses requiring significant training for teachers, specified laboratory equipment, standard topics, exams, etc. Schools implementing Project Lead the Way implement an…
ERIC Educational Resources Information Center
Menassa, Carol Chukri
2009-01-01
A project-specific dispute resolution ladder (DRL) typically consists of multiple alternative dispute resolution (ADR) techniques that are chosen to assist in mitigating the impact of change orders and claims (CCO) occurring during the project construction phase, and avoid their escalation to protracted disputes that adversely affect a…
Sarah Pratt; Lisa Holsinger; Robert E. Keane
2006-01-01
A critical component of the Landscape Fire and Resource Management Planning Tools Prototype Project, or LANDFIRE Prototype Project, was the development of a nationally consistent method for estimating historical reference conditions for vegetation composition and structure and wildland fire regimes. These estimates of past vegetation composition and condition are used...
The Aripuana Park and the Polonoroeste Programme. IWGIA Document No. 59.
ERIC Educational Resources Information Center
Junqueira, Carmen; Mindlin, Betty
The Polonoroeste program is a World Bank-funded colonization project in central Brazil. This document looks at the indigenous peoples of the Aripuana Park which lies in the path of the development plan. The main objective of the $1.5 billion project is to pave a highway from Cuiaba to Porto Velho. The project consists of the highway, colonization…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-19
... to study the feasibility of the Mississippi Lock and Dam No. 18 Water Power Project (L&D 18 Project... Project would consist of: (1) Twenty-four very-low-head turbine-generator units that would have a... reinforced concrete structure enclosing the turbine-generator units and having a top of deck elevation of 528...
ERIC Educational Resources Information Center
Beigel, Allan
1991-01-01
Lessons learned by the University of Arizona through participation in two major scientific projects, construction of an astronomical observatory and a super cyclotron, are discussed. Four criteria for institutional participation in such projects are outlined, including consistency with institutional mission, adequate resources, leadership, and…
Bulk specific gravity round-robin using the Corelok vacuum sealing device
DOT National Transportation Integrated Search
2002-11-01
This project conducted an evaluation of the Corelok device for the determination of the bulk specific gravity of compacted hot mix asphalt samples. The project consisted of the bulk specific gravity determination for compacted HMA mixes utilizing the...
Ongoing evaluation of alternatively fueled buses : final report.
DOT National Transportation Integrated Search
2016-05-01
The goal of this project is to continue collecting and reporting data on the performance and costs of alternatively fueled public transit vehicles in Florida in a consistent manner. Over the course of this project, researchers sent repeated data requ...
Experimental maintenance painting of I 65 in Louisville (FR 108)
DOT National Transportation Integrated Search
2002-10-01
I-65 project in downtown Louisville consisted of 27 bridges having approximately 1,493,100 ft2 of steel. The structures had existing coatings that contained lead. The project posed significant operational and public safety and operational constraints...
Code of Federal Regulations, 2012 CFR
2012-07-01
... the time of purchase. Therefore, in the negotiation for the purchase of land, an approved current... should study the background data of the project, consisting of the authorizing act, survey report, project document, design memoranda, etc.; the applicable appraisal reports; tract ownership data...
Code of Federal Regulations, 2011 CFR
2011-07-01
... the time of purchase. Therefore, in the negotiation for the purchase of land, an approved current... should study the background data of the project, consisting of the authorizing act, survey report, project document, design memoranda, etc.; the applicable appraisal reports; tract ownership data...
Code of Federal Regulations, 2014 CFR
2014-07-01
... the time of purchase. Therefore, in the negotiation for the purchase of land, an approved current... should study the background data of the project, consisting of the authorizing act, survey report, project document, design memoranda, etc.; the applicable appraisal reports; tract ownership data...
Code of Federal Regulations, 2013 CFR
2013-07-01
... the time of purchase. Therefore, in the negotiation for the purchase of land, an approved current... should study the background data of the project, consisting of the authorizing act, survey report, project document, design memoranda, etc.; the applicable appraisal reports; tract ownership data...
Code of Federal Regulations, 2010 CFR
2010-07-01
... the time of purchase. Therefore, in the negotiation for the purchase of land, an approved current... should study the background data of the project, consisting of the authorizing act, survey report, project document, design memoranda, etc.; the applicable appraisal reports; tract ownership data...
Code of Federal Regulations, 2013 CFR
2013-07-01
...: public improvements construction and square development. Public improvements construction consists of... configuration, and pedestrian amenities. Square development consists of design and construction of development projects primarily on city blocks, known as squares, within the Development Area. These development...
NASA Technical Reports Server (NTRS)
Koster, Randal D.; Fekete, Balazs M.; Huffman, George J.; Stackhouse, Paul W.
2006-01-01
The International Satellite Land Surface Climatology Project Initiative 2 (ISLSCP-2) data set provides the data needed to characterize the surface water budget across much of the globe in terms of energy availability (net radiation) and water availability (precipitation) controls. The data, on average, are shown to be consistent with Budyko s decades-old framework, thereby demonstrating the continuing relevance of Budyko s semiempirical relationships. This consistency, however, appears only when a small subset of the data with hydrologically suspicious behavior is removed from the analysis. In general, the precipitation, net radiation, and runoff data also appear consistent in their interannual variability and in the phasing of their seasonal cycles.
EMPRESS: A European Project to Enhance Process Control Through Improved Temperature Measurement
NASA Astrophysics Data System (ADS)
Pearce, J. V.; Edler, F.; Elliott, C. J.; Rosso, L.; Sutton, G.; Andreu, A.; Machin, G.
2017-08-01
A new European project called EMPRESS, funded by the EURAMET program `European Metrology Program for Innovation and Research,' is described. The 3 year project, which started in the summer of 2015, is intended to substantially augment the efficiency of high-value manufacturing processes by improving temperature measurement techniques at the point of use. The project consortium has 18 partners and 5 external collaborators, from the metrology sector, high-value manufacturing, sensor manufacturing, and academia. Accurate control of temperature is key to ensuring process efficiency and product consistency and is often not achieved to the level required for modern processes. Enhanced efficiency of processes may take several forms including reduced product rejection/waste; improved energy efficiency; increased intervals between sensor recalibration/maintenance; and increased sensor reliability, i.e., reduced amount of operator intervention. Traceability of temperature measurements to the International Temperature Scale of 1990 (ITS-90) is a critical factor in establishing low measurement uncertainty and reproducible, consistent process control. Introducing such traceability in situ (i.e., within the industrial process) is a theme running through this project.
SmartPark Technology Demonstration Project, Phase II: Final Report
DOT National Transportation Integrated Search
2018-05-01
The purpose of FMCSA's SmartPark project was to determine the feasibility of a technology for providing truck parking space availability information in real time to truckers on the road. SmartPark consisted of two phases. Phase I was a field operatio...
R&D Project Plan SLT/NEI/TRI Phase 2
The purpose of this project is to identify issues and solutions related to consistency of emissions data between SLT/NEI and TRI and to provide guidance to SLT/NEI/TRI programs to enhance data sharing between TRI and SLT/NEI data.
Managing Information On Technical Requirements
NASA Technical Reports Server (NTRS)
Mauldin, Lemuel E., III; Hammond, Dana P.
1993-01-01
Technical Requirements Analysis and Control Systems/Initial Operating Capability (TRACS/IOC) computer program provides supplemental software tools for analysis, control, and interchange of project requirements so qualified project members have access to pertinent project information, even if in different locations. Enables users to analyze and control requirements, serves as focal point for project requirements, and integrates system supporting efficient and consistent operations. TRACS/IOC is HyperCard stack for use on Macintosh computers running HyperCard 1.2 or later and Oracle 1.2 or later.
The Southwest Regional Gap Analysis Project (SW ReGAP) improves upon previous GAP projects conducted in Arizona, Colorado, Nevada, New Mexico, and Utah to provide a
consistent, seamless vegetation map for this large and ecologically diverse geographic region. Nevada's compone...
Computer-Mediated Communication: Decisionmaking and Informal Interaction.
1985-02-15
the context of a project called the Computer-Administered Panel Study L (CAPS). Respondents in the project were 96 UNC undergraduate students . The...project consisted of the administration of over 100 questionnaires and experimental units to this panel of undergraduates who reported to weekly sessions...humanely (eg., are more likely to ignore or insult) via the more distant media. Audio-only communications are more likely to be depersonalized
ERIC Educational Resources Information Center
Akçöltekin, Alptürk
2016-01-01
The main purpose of this study is to develop positive attitudes in high school teachers towards scientific research and project competitions by training them in scientific research and project preparation subjects. The study group consists of 90 high school teachers. As a result of the study, a significant difference was found in favor of…
ERIC Educational Resources Information Center
Los Angeles Unified School District, CA. Div. of Adult and Occupational Education.
This document consists of performance, computational, and communication modules used by the Working Smart workplace literacy project, a project conducted for the hotel and food industry in the Los Angeles area by a public school district and several profit and nonprofit companies. Literacy instruction was merged with job requirements of the…
Study on the Selection of Equipment Suppliers for Wind Power Generation EPC Project
NASA Astrophysics Data System (ADS)
Yang, Yuanyue; Li, Huimin
2017-12-01
In the EPC project, the purchase cost of equipments accounted for about 60% of the total project cost, thus, the selection of equipment suppliers has an important influence on the EPC project. This paper, took EPC project for the phase I engineering of Guizhou Huaxi Yunding wind power plant as research background, constructed the evaluation index system for the selection of equipment suppliers for wind power generation EPC project from multiple perspectives, and introduced matter-element extension evaluation model to evaluate the selection of equipment suppliers for this project from the qualitative and quantitative point of view. The result is consistent with the actual situation, which verifies the validity and operability of this method.
Bigdely-Shamlo, Nima; Mullen, Tim; Kreutz-Delgado, Kenneth; Makeig, Scott
2013-01-01
A crucial question for the analysis of multi-subject and/or multi-session electroencephalographic (EEG) data is how to combine information across multiple recordings from different subjects and/or sessions, each associated with its own set of source processes and scalp projections. Here we introduce a novel statistical method for characterizing the spatial consistency of EEG dynamics across a set of data records. Measure Projection Analysis (MPA) first finds voxels in a common template brain space at which a given dynamic measure is consistent across nearby source locations, then computes local-mean EEG measure values for this voxel subspace using a statistical model of source localization error and between-subject anatomical variation. Finally, clustering the mean measure voxel values in this locally consistent brain subspace finds brain spatial domains exhibiting distinguishable measure features and provides 3-D maps plus statistical significance estimates for each EEG measure of interest. Applied to sufficient high-quality data, the scalp projections of many maximally independent component (IC) processes contributing to recorded high-density EEG data closely match the projection of a single equivalent dipole located in or near brain cortex. We demonstrate the application of MPA to a multi-subject EEG study decomposed using independent component analysis (ICA), compare the results to k-means IC clustering in EEGLAB (sccn.ucsd.edu/eeglab), and use surrogate data to test MPA robustness. A Measure Projection Toolbox (MPT) plug-in for EEGLAB is available for download (sccn.ucsd.edu/wiki/MPT). Together, MPA and ICA allow use of EEG as a 3-D cortical imaging modality with near-cm scale spatial resolution. PMID:23370059
Pérez-Pérez, Martín; Glez-Peña, Daniel; Fdez-Riverola, Florentino; Lourenço, Anália
2015-02-01
Document annotation is a key task in the development of Text Mining methods and applications. High quality annotated corpora are invaluable, but their preparation requires a considerable amount of resources and time. Although the existing annotation tools offer good user interaction interfaces to domain experts, project management and quality control abilities are still limited. Therefore, the current work introduces Marky, a new Web-based document annotation tool equipped to manage multi-user and iterative projects, and to evaluate annotation quality throughout the project life cycle. At the core, Marky is a Web application based on the open source CakePHP framework. User interface relies on HTML5 and CSS3 technologies. Rangy library assists in browser-independent implementation of common DOM range and selection tasks, and Ajax and JQuery technologies are used to enhance user-system interaction. Marky grants solid management of inter- and intra-annotator work. Most notably, its annotation tracking system supports systematic and on-demand agreement analysis and annotation amendment. Each annotator may work over documents as usual, but all the annotations made are saved by the tracking system and may be further compared. So, the project administrator is able to evaluate annotation consistency among annotators and across rounds of annotation, while annotators are able to reject or amend subsets of annotations made in previous rounds. As a side effect, the tracking system minimises resource and time consumption. Marky is a novel environment for managing multi-user and iterative document annotation projects. Compared to other tools, Marky offers a similar visually intuitive annotation experience while providing unique means to minimise annotation effort and enforce annotation quality, and therefore corpus consistency. Marky is freely available for non-commercial use at http://sing.ei.uvigo.es/marky. Copyright © 2014 Elsevier Ireland Ltd. All rights reserved.
The Facilitator. Technical Note No. 11.
ERIC Educational Resources Information Center
Barriga, Patricio; And Others
This paper describes the concept, training, and experiences of community facilitators as change agents in a nonformal education project in rural Ecuador. Presently, the social, economic, and political context of the rural Ecuadorian consists of poverty, racial prejudice, economic exploitation, and psychological dependency. The project attempted to…
Code of Federal Regulations, 2014 CFR
2014-07-01
... Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.41... constructed hurricane/shore protection projects. (b) Implementation of authority. The Rehabilitation and... projects damaged by floods and coastal storm events. The RIP consists of a process to inspect flood control...
Code of Federal Regulations, 2013 CFR
2013-07-01
... Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.41... constructed hurricane/shore protection projects. (b) Implementation of authority. The Rehabilitation and... projects damaged by floods and coastal storm events. The RIP consists of a process to inspect flood control...
Code of Federal Regulations, 2012 CFR
2012-07-01
... Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.41... constructed hurricane/shore protection projects. (b) Implementation of authority. The Rehabilitation and... projects damaged by floods and coastal storm events. The RIP consists of a process to inspect flood control...
Code of Federal Regulations, 2011 CFR
2011-07-01
... Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.41... constructed hurricane/shore protection projects. (b) Implementation of authority. The Rehabilitation and... projects damaged by floods and coastal storm events. The RIP consists of a process to inspect flood control...
Code of Federal Regulations, 2010 CFR
2010-07-01
... Control Works Damaged by Flood or Coastal Storm: The Corps Rehabilitation and Inspection Program § 203.41... constructed hurricane/shore protection projects. (b) Implementation of authority. The Rehabilitation and... projects damaged by floods and coastal storm events. The RIP consists of a process to inspect flood control...
45 CFR 94.5 - Management and reporting of financial conflicts of interest.
Code of Federal Regulations, 2012 CFR
2012-10-01
... a PHS-funded research project, the designated official(s) of an Institution shall, consistent with... any significant financial interests relate to PHS-funded research; determine whether a financial... publishing the research); (ii) For research projects involving human subjects research, disclosure of...
45 CFR 94.5 - Management and reporting of financial conflicts of interest.
Code of Federal Regulations, 2011 CFR
2011-10-01
... a PHS-funded research project, the designated official(s) of an Institution shall, consistent with... any significant financial interests relate to PHS-funded research; determine whether a financial... publishing the research); (ii) For research projects involving human subjects research, disclosure of...
45 CFR 94.5 - Management and reporting of financial conflicts of interest.
Code of Federal Regulations, 2013 CFR
2013-10-01
... a PHS-funded research project, the designated official(s) of an Institution shall, consistent with... any significant financial interests relate to PHS-funded research; determine whether a financial... publishing the research); (ii) For research projects involving human subjects research, disclosure of...
45 CFR 94.5 - Management and reporting of financial conflicts of interest.
Code of Federal Regulations, 2014 CFR
2014-10-01
... a PHS-funded research project, the designated official(s) of an Institution shall, consistent with... any significant financial interests relate to PHS-funded research; determine whether a financial... publishing the research); (ii) For research projects involving human subjects research, disclosure of...
Reducing school bus/light-vehicle conflicts through connected vehicle communications : final report.
DOT National Transportation Integrated Search
2016-09-15
This project aimed to develop and test a concept for improving the safety of school bus transportation using connected vehicle technology. The project consisted of three key steps that led to a final road study: 1) conducting focus groups with light ...
76 FR 55644 - Plumas County Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-08
... Community Self-Determination Act (Pub. L 110-343) (the Act) and operates in compliance with the Federal... provide advice and recommendations to the Forest Service concerning projects and funding consistent with... Cycle 2 project applications for potential funding recommendations to National Forest Supervisors. DATES...
Pajak, A
1996-01-01
The WHO MONICA Project is a multicentre collaborative study coordinated by The World Health Organization. The aim is to measure trends in cardiovascular disease mortality and morbidity and to assess the extent, to which these trends are related to changes in risk factor levels and in medical care measured at the same time in defined communities in different countries. There are 38 participating research centres from 21 countries from 4 continents, including two Polish centres: POL-MONICA Warszawa and POL-MONICA Kraków. Population studied in POL-MONICA Warszawa Project consisted of residents of two districts of Warsaw capital. The interest of the research of the POL-MONICA Kraków focuses on problems of the myocardial infarction in semi-rural population and the population observed consisted of men and women at age 25-64 years residents of one Polish province-Tarnobrzeg Voivodship.
BAO plate archive digitization
NASA Astrophysics Data System (ADS)
Mickaelian, A. M.; Nikoghosyan, E. H.; Gigoyan, K. S.; Paronyan, G. M.; Abrahamyan, H. V.; Andreasyan, H. R.; Azatyan, N. M.; Kostandyan, G. R.; Khachatryan, K. G.; Vardanyan, A. V.; Gyulzadyan, M. V.; Mikayelyan, G. A.; Farmanyan, S. V.; Knyazyan, A. V.
Astronomical plate archives created on the basis of numerous observations at many observatories are important part of the astronomical heritage. Byurakan Astrophysical Observatory (BAO) plate archive consists of 37,000 photographic plates and films, obtained at 2.6m telescope, 1m and 0.5m Schmidt telescopes and other smaller ones during 1947-1991. In 2015, we have started a project on the whole BAO Plate Archive digitization, creation of electronic database and its scientific usage. A Science Program Board is created to evaluate the observing material, to investigate new possibilities and to propose new projects based on the combined usage of these observations together with other world databases. The Executing Team consists of 11 astronomers and 2 computer scientists and will use 2 EPSON Perfection V750 Pro scanners for the digitization. The project will run during 3 years in 2015-2017 and the final result will be an electronic database and online interactive sky map to be used for further research projects.
Radiation Hardened Telerobotic Dismantling System Development Final Report CRADA No. TC-1340-96
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, C.; Lightman, A.
This project was a collaborative effort between the University of California, LLNL and RedZone Robotics, Inc. for the development of radiation-hardened telerobotic dismantling systems for use in applications such as nuclear facility remediation, nuclear accident response, and Chemobyltype remediation. The project supported the design, development, fabrication and testing of a Ukrainian robotic systems. The project was completed on time and within budget. All deliverables were completed. The final project deliverables were consistent with the plans developed in the original project with the exception that the fabricated systems remained in Ukraine.
Enhancements to and Applications with the "Unified" Long-Term PSC Database
NASA Technical Reports Server (NTRS)
Fromm, Michael; Alfred, Jerome
2004-01-01
This report summaries the project team's activity during the period 1 January - 31 March 2004. It consists of a project plan, which was completed during this period and an indication of the completion status of each phase of the project. The intention of the investigative team is to closely follow the statement of work documented in our proposal. For this reason, the proposal may be referenced in this and upcoming status reports. This project got underway in this quarter. Our activity was to formulate a project plan and to engage in planning meetings with collaborators.
The Human Genome Project: Information access, management, and regulation. Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
McInerney, J.D.; Micikas, L.B.
The Human Genome Project is a large, internationally coordinated effort in biological research directed at creating a detailed map of human DNA. This report describes the access of information, management, and regulation of the project. The project led to the development of an instructional module titled The Human Genome Project: Biology, Computers, and Privacy, designed for use in high school biology classes. The module consists of print materials and both Macintosh and Windows versions of related computer software-Appendix A contains a copy of the print materials and discs containing the two versions of the software.
Science Base and Tools for Evaluating Stream Restoration Project Proposals.
NASA Astrophysics Data System (ADS)
Cluer, B.; Thorne, C.; Skidmore, P.; Castro, J.; Pess, G.; Beechie, T.; Shea, C.
2008-12-01
Stream restoration, stabilization, or enhancement projects typically employ site-specific designs and site- scale habitat improvement projects have become the default solution to many habitat problems and constraints. Such projects are often planned and implemented without thorough consideration of the broader scale problems that may be contributing to habitat degradation, attention to project resiliency to flood events, accounting for possible changes in climate or watershed land use, or ensuring the long term sustainability of the project. To address these issues, NOAA Fisheries and USFWS have collaboratively commissioned research to develop a science document and accompanying tools to support more consistent and comprehensive review of stream management and restoration projects proposals by Service staff responsible for permitting. The science document synthesizes the body of knowledge in fluvial geomorphology and presents it in a way that is accessible to the Services staff biologists, who are not trained experts in this field. Accompanying the science document are two electronic tools: a Project Information Checklist to assist in evaluating whether a proposal includes all the information necessary to allow critical and thorough project evaluation; and a Project Evaluation Tool (in flow chart format) that guides reviewers through the steps necessary to critically evaluate the quality of the information submitted, the goals and objectives of the project, project planning and development, project design, geomorphic-habitat-species relevance, and risks to listed species. Materials for training Services staff and others in the efficient use of the science document and tools have also been developed. The longer term goals of this effort include: enabling consistent and comprehensive reviews that are completed in a timely fashion by regulators; facilitating improved project planning and design by proponents; encouraging projects that are attuned to their watershed and geomorphic contexts; questioning perceived constraints on project design; reducing the use of hard structures and encouraging deformability; promoting designs that address both risk and uncertainty in applying engineering design standards; allowing for future climate and land use changes; and encouraging post-project monitoring, appraisal and project aftercare.
ERIC Educational Resources Information Center
Polanin, Joshua R.; Wilson, Sandra Jo
2014-01-01
The purpose of this project is to demonstrate the practical methods developed to utilize a dataset consisting of both multivariate and multilevel effect size data. The context for this project is a large-scale meta-analytic review of the predictors of academic achievement. This project is guided by three primary research questions: (1) How do we…
Defining a Progress Metric for CERT RMM Improvement
2017-09-14
Table 1) should be used along with clear guidance on what is to be measured, to avoid subjective interpretations by different project managers . In some...products for each CERT-RMM practice. Project managers should be trained to help the organization improve the accuracy and consistency of its reporting...and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. 1. AGENCY USE ONLY (Leave Blank) 2
ERIC Educational Resources Information Center
Carlson, Lawrence O.
The project, intended to design and field test models of specialized library services for older adults, was conducted in two parts. Phase 1 consisted of collecting and evaluating data for use in designing models in Louisville, Lexington, Somerset, and Hazard, Kentucky. Data was collected by search of the literature, personal interviews, a…
ERIC Educational Resources Information Center
Nappi, Andrew T., Ed.; Suglia, Anthony F., Ed.
Twenty-five award winning teacher developed projects and courses in economics are described. The projects are designed for use in primary, intermediate, junior high, and senior high schools. Descriptions indicate grade level, project background, time allotment, objectives, activities, and evaluation. The publication consists of five chapters.…
Summary of Research 1997, Department of Computer Science.
1999-01-01
Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704...contains summaries of research projects in the Department of Computer Science . A list of recent publications is also included which consists of conference...parallel programming. Recently, in a joint research project between NPS and the Russian Academy of Sciences Systems Programming Insti- tute in Moscow
United States Air Force Statistical Digest, Fiscal Year 1959. Fourteenth Edition
1959-09-30
Support Forces for fiscal year 1959 consist of Air Refueling; Strategic Support; Airborne Early Warning and Control; Radar Evaluation ;.He11cop~er...missions. (EI) Test: Aircraft assigned to evaluate the aircraft and/or its components installed as standard equipment. (EH) Test Support: Aircraft... consumables under two AF-GEN sub-projects: PROJECT SEAWEED and PROJECT NIGHT LIFE & FLYAWAY KITS. Also included in this section is data on ammunition
Overview of Robotic Devices for Nursing Care Project.
Hirukawa, Hirohisa
2017-01-01
METI/AMED are conducting a project on the development and deployment of robotic devices for nursing care to enhance the autonomy of elderly persons and assist care givers. An evaluation protocol is presented and the devices developed in the project are introduced. The devices consist of transfer assist devices (wearable/non-wearable), walking assist devices (outdoor/indoor), safety surveillance sensors (nursing home/private home), bath lift and toilet assist.
NASA Astrophysics Data System (ADS)
Brekke, L. D.; Pruitt, T.; Maurer, E. P.; Duffy, P. B.
2007-12-01
Incorporating climate change information into long-term evaluations of water and energy resources requires analysts to have access to climate projection data that have been spatially downscaled to "basin-relevant" resolution. This is necessary in order to develop system-specific hydrology and demand scenarios consistent with projected climate scenarios. Analysts currently have access to "climate model" resolution data (e.g., at LLNL PCMDI), but not spatially downscaled translations of these datasets. Motivated by a common interest in supporting regional and local assessments, the U.S. Bureau of Reclamation and LLNL (through support from the DOE National Energy Technology Laboratory) have teamed to develop an archive of downscaled climate projections (temperature and precipitation) with geographic coverage consistent with the North American Land Data Assimilation System domain, encompassing the contiguous United States. A web-based information service, hosted at LLNL Green Data Oasis, has been developed to provide Reclamation, LLNL, and other interested analysts free access to archive content. A contemporary statistical method was used to bias-correct and spatially disaggregate projection datasets, and was applied to 112 projections included in the WCRP CMIP3 multi-model dataset hosted by LLNL PCMDI (i.e. 16 GCMs and their multiple simulations of SRES A2, A1b, and B1 emissions pathways).
Designing Appropriate Scaffolding for Student Science Projects
ERIC Educational Resources Information Center
Johnson, Marie; Smith, Mark
2008-01-01
The authors have developed a successful approach to teaching and inspiring undergraduate science and nonscience majors to complete creditable, semester-long, hands-on science research projects. This approach utilizes a carefully developed scaffolding consisting of in-class exercises and discussions, preparatory homework and lab events, and three…
75 FR 61479 - Western Passage OCGenTM
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-05
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12680-004] Western Passage...' express permission. The proposed project would consist of: (1) 2 OCGen\\TM\\ hydrokinetic tidal devices each... turbine-generating units of each device to a shore station; (5) a 2,800-foot-long, 34.5-kilovolt...
77 FR 51965 - Southwest Mississippi Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
... Committee will meet in Meadville, MS. The committee is authorized under the Secure Rural Schools and... provide advice and recommendations to the Forest Service concerning projects and funding consistent with... and recommend projects authorized under title II of the Act. DATES: The meeting will be held Tuesday...
Instructional Implications of Inquiry in Reading Comprehension.
ERIC Educational Resources Information Center
Snow, David
A contract deliverable on the NIE Communication Skills Project, this report consists of three separate documents describing the instructional implications of the analytic and empirical work carried out for the "Classroom Instruction in Reading Comprehension" part of the project: (1) Guidelines for Phrasal Segmentation; (2) Parsing Tasks…
The Management Implications of Appil.
ERIC Educational Resources Information Center
Bodey, D. W.
1985-01-01
The Advanced Physics Project for Independent Learning (Appil) consists of 10 units based on three themes, namely, materials, forces and fields, and waves. Discusses the content and aims of the project, its emphasis on student-centered learning, managerial advantages, characteristics of the teacher's role, resource implications, and other topics.…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-27
... study the feasibility of the Half Moon Cove Tidal Power Plant Project to be located in Half Moon Cove.... The proposed project would consist of: (1) The existing 544-acre Half Moon Cove; (2) a new 410-foot...
Gauging the Health of New England's Lakes and Ponds
The New England Lakes and Ponds Project provides a consistent and first time comprehensive assessment of the ecological and water quality condition of lakes and ponds across the New England region. The project is being conducted by EPA along with the New England Interstate Water...
76 FR 35426 - Denali Commission Fiscal Year 2011 Draft Work Plan
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-17
... facilitates a successful leadership development project for young Alaskans. Training Funding Strategy... quickly to targets of opportunity, but they have also had the positive effect of ensuring project design... consistent with the Commission's mission and values in 2006. Sponsorship activities provide a positive venue...
Advances in Projection Technology for On-Line Instruction.
ERIC Educational Resources Information Center
Davis, H. Scott; Miller, Marsha
This document consists of supplemental information designed to accompany a presentation on the application of projection technology, including video projectors and liquid crystal display (LCD) devices, in the online catalog library instruction program at the Indiana State University libraries. Following an introductory letter, the packet includes:…
43 CFR 10005.13 - Geographic and ecological context for the plan.
Code of Federal Regulations, 2011 CFR
2011-10-01
... the plan. In accordance with the Act, the Commission has the authority to implement projects... ecological reference within which to evaluate proposed projects and otherwise plan its activities. In delineating watersheds, the Commission will be consistent with the best ecological and hydrological science...
A Program Management Framework for Facilities Managers
ERIC Educational Resources Information Center
King, Dan
2012-01-01
The challenge faced by senior facility leaders is not how to execute a single project, but rather, how to successfully execute a large program consisting of hundreds of projects. Senior facilities officers at universities, school districts, hospitals, airports, and other organizations with extensive facility inventories, typically manage project…
77 FR 48948 - Sierra County Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-15
... Community Self-Determination Act (Pub. L. 112-141) (the Act) and operates in compliance with the Federal... provide advice and recommendations to the Forest Service concerning projects and funding consistent with... and recommend projects authorized under title II of the Act. DATES: The meetings will be held...
77 FR 50983 - Ozark-Ouachita Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-23
... meet in Waldron, Arkansas. The committee is authorized under the Secure Rural Schools and Community... and recommendations to the Forest Service concerning projects and funding consistent with the title II... projects authorized under title II of the Act. DATES: The meeting will be held September 25, 2012...
7 CFR 3560.453 - Workout agreements.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., such as cash flow concerns, budget revisions, deferred maintenance, vacancies, or violations of... operations and management at a housing project; or (iii) A commitment of additional financial resources to... consistent with the borrower's management plan. If proposed actions are not consistent with the borrower's...
Ulysses - An ESA/NASA cooperative programme
NASA Technical Reports Server (NTRS)
Meeks, W.; Eaton, D.
1990-01-01
Cooperation between ESA and NASA is discussed, noting that the Memorandum of Understanding lays the framework for this relationship, defining the responsibilities of ESA and NASA and providing for appointment of leadership and managers for the project. Members of NASA's Jet Propulsion Laboratory and ESA's ESTEC staff have been appointed to leadership positions within the project and ultimate control of the project rests with the Joint Working Group consisting of two project managers and two project scientists, equally representing both organizations. Coordination of time scales and overall mission design is discussed, including launch cooperation, public relations, and funding of scientific investigations such as Ulysses. Practical difficulties of managing an international project are discussed such as differing documentation requirements and communication techniques, and assurance of equality on projects.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Andersson, J.
1993-12-31
The Swedish Nuclear Power Inspectorate, SKI, regulatory research program has to prepare for the process of licensing a repository for spent nuclear fuel, by building up the necessary knowledge and review capacity. SKIs main strategy for meeting this demand is to develop an independent performance assessment capability. SKIs first own performance assessment project, Project-90, was completed in 1991 and is now followed by a new project, SITE-94. SITE-94 is based on conclusions reached within Project-90. An independent review of Project-90, carried out by a NEA team of experts, has also contributed to the formation of the project. Another important reasonmore » for the project is that the implementing organization in Sweden, SKB, has proposed to submit an application to start detailed investigation of a repository candidate site around 1997. SITE-94 is a performance assessment of a hypothetical repository at a real site. The main objective of the project is to determine how site specific data should be assimilated into the performance assessment process, and to evaluate how uncertainties inherent in site characterization will influence performance assessment results. This will be addressed by exploring multiple interpretations, conceptual models, and parameters consistent with the site data. The site evaluation will strive for consistency between geological, hydrological, rock mechanical, and geochemical descriptions. Other important elements of SITE-94 are the development of a practical and defensible methodology for defining, constructing and analyzing scenarios, the development of approaches for treatment of uncertainties, evaluation of canister integrity, and the development and application of an appropriate quality assurance plan for performance assessments.« less
Efferent projections of the septum in the Tegu lizard, Tupinambis nigropunctatus.
Sligar, C M; Voneida, T J
1981-09-01
A H3 proline or H3 leucine mixture was injected into the septal region of the Tegu lizard in order to determine its efferent projections. The brains were processed according to standard autoradiographic technique and counterstained with cresyl violet. Septal projections were limited to either telencephalic or diencephalic areas. Intratelencephalic projections consisted of efferents to medial pallium, nucleus accumbens, bed nucleus of the anterior commissure, preoptic area and septum itself. Fibers entering the diencephalon projected to medial habenular nucleus, dorsomedial thalamic nucleus, dorsolateral thalamic area, periventricular nucleus of the hypothalamus, lateral hypothalamic area and mammillary nucleus. The results are discussed in relation to the efferent projections of the septum in other vertebrates.
Project resource reallocation algorithm
NASA Technical Reports Server (NTRS)
Myers, J. E.
1981-01-01
A methodology for adjusting baseline cost estimates according to project schedule changes is described. An algorithm which performs a linear expansion or contraction of the baseline project resource distribution in proportion to the project schedule expansion or contraction is presented. Input to the algorithm consists of the deck of cards (PACE input data) prepared for the baseline project schedule as well as a specification of the nature of the baseline schedule change. Output of the algorithm is a new deck of cards with all work breakdown structure block and element of cost estimates redistributed for the new project schedule. This new deck can be processed through PACE to produce a detailed cost estimate for the new schedule.
Hypothalamic Projections to the Optic Tectum in Larval Zebrafish
Heap, Lucy A.; Vanwalleghem, Gilles C.; Thompson, Andrew W.; Favre-Bulle, Itia; Rubinsztein-Dunlop, Halina; Scott, Ethan K.
2018-01-01
The optic tectum of larval zebrafish is an important model for understanding visual processing in vertebrates. The tectum has been traditionally viewed as dominantly visual, with a majority of studies focusing on the processes by which tectal circuits receive and process retinally-derived visual information. Recently, a handful of studies have shown a much more complex role for the optic tectum in larval zebrafish, and anatomical and functional data from these studies suggest that this role extends beyond the visual system, and beyond the processing of exclusively retinal inputs. Consistent with this evolving view of the tectum, we have used a Gal4 enhancer trap line to identify direct projections from rostral hypothalamus (RH) to the tectal neuropil of larval zebrafish. These projections ramify within the deepest laminae of the tectal neuropil, the stratum album centrale (SAC)/stratum griseum periventriculare (SPV), and also innervate strata distinct from those innervated by retinal projections. Using optogenetic stimulation of the hypothalamic projection neurons paired with calcium imaging in the tectum, we find rebound firing in tectal neurons consistent with hypothalamic inhibitory input. Our results suggest that tectal processing in larval zebrafish is modulated by hypothalamic inhibitory inputs to the deep tectal neuropil. PMID:29403362
Hypothalamic Projections to the Optic Tectum in Larval Zebrafish.
Heap, Lucy A; Vanwalleghem, Gilles C; Thompson, Andrew W; Favre-Bulle, Itia; Rubinsztein-Dunlop, Halina; Scott, Ethan K
2017-01-01
The optic tectum of larval zebrafish is an important model for understanding visual processing in vertebrates. The tectum has been traditionally viewed as dominantly visual, with a majority of studies focusing on the processes by which tectal circuits receive and process retinally-derived visual information. Recently, a handful of studies have shown a much more complex role for the optic tectum in larval zebrafish, and anatomical and functional data from these studies suggest that this role extends beyond the visual system, and beyond the processing of exclusively retinal inputs. Consistent with this evolving view of the tectum, we have used a Gal4 enhancer trap line to identify direct projections from rostral hypothalamus (RH) to the tectal neuropil of larval zebrafish. These projections ramify within the deepest laminae of the tectal neuropil, the stratum album centrale (SAC)/stratum griseum periventriculare (SPV), and also innervate strata distinct from those innervated by retinal projections. Using optogenetic stimulation of the hypothalamic projection neurons paired with calcium imaging in the tectum, we find rebound firing in tectal neurons consistent with hypothalamic inhibitory input. Our results suggest that tectal processing in larval zebrafish is modulated by hypothalamic inhibitory inputs to the deep tectal neuropil.
Large rainfall changes consistently projected over substantial areas of tropical land
NASA Astrophysics Data System (ADS)
Chadwick, Robin; Good, Peter; Martin, Gill; Rowell, David P.
2016-02-01
Many tropical countries are exceptionally vulnerable to changes in rainfall patterns, with floods or droughts often severely affecting human life and health, food and water supplies, ecosystems and infrastructure. There is widespread disagreement among climate model projections of how and where rainfall will change over tropical land at the regional scales relevant to impacts, with different models predicting the position of current tropical wet and dry regions to shift in different ways. Here we show that despite uncertainty in the location of future rainfall shifts, climate models consistently project that large rainfall changes will occur for a considerable proportion of tropical land over the twenty-first century. The area of semi-arid land affected by large changes under a higher emissions scenario is likely to be greater than during even the most extreme regional wet or dry periods of the twentieth century, such as the Sahel drought of the late 1960s to 1990s. Substantial changes are projected to occur by mid-century--earlier than previously expected--and to intensify in line with global temperature rise. Therefore, current climate projections contain quantitative, decision-relevant information on future regional rainfall changes, particularly with regard to climate change mitigation policy.
A tool to assess sex-gender when selecting health research projects.
Tomás, Concepción; Yago, Teresa; Eguiluz, Mercedes; Samitier, M A Luisa; Oliveros, Teresa; Palacios, Gemma
2015-04-01
To validate the questionnaire "Gender Perspective in Health Research" (GPIHR) to assess the inclusion of gender perspective in research projects. Validation study in two stages. Feasibility was analysed in the first, and reliability, internal consistence and validity in the second. Aragón Institute of Health Science, Aragón, Spain. GPIHR was applied to 118 research projects funded in national and international competitive tenders from 2003 to 2012. Analysis of inter- and intra-observer reliability with Kappa index and internal consistency with Cronbach's alpha. Content validity analysed through literature review and construct validity with an exploratory factor analysis. Validated GPIHR has 10 questions: 3 in the introduction, 1 for objectives, 3 for methodology and 3 for research purpose. Average time of application was 13min Inter-observer reliability (Kappa) varied between 0.35 and 0.94 and intra-observer between 0.40 and 0.94. Theoretical construct is supported in the literature. Factor analysis identifies three levels of GP inclusion: "difference by sex", "gender sensitive" and "feminist research" with an internal consistency of 0.64, 0.87 and 0.81, respectively, which explain 74.78% of variance. GPIHR questionnaire is a valid tool to assess GP and useful for those researchers who would like to include GP in their projects. Copyright © 2014 Elsevier España, S.L.U. All rights reserved.
Design methodology and projects for space engineering
NASA Technical Reports Server (NTRS)
Nichols, S.; Kleespies, H.; Wood, K.; Crawford, R.
1993-01-01
NASA/USRA is an ongoing sponsor of space design projects in the senior design course of the Mechanical Engineering Department at The University of Texas at Austin. This paper describes the UT senior design sequence, consisting of a design methodology course and a capstone design course. The philosophical basis of this sequence is briefly summarized. A history of the Department's activities in the Advanced Design Program is then presented. The paper concludes with a description of the projects completed during the 1991-92 academic year and the ongoing projects for the Fall 1992 semester.
Implementation of Discovery Projects in Statistics
ERIC Educational Resources Information Center
Bailey, Brad; Spence, Dianna J.; Sinn, Robb
2013-01-01
Researchers and statistics educators consistently suggest that students will learn statistics more effectively by conducting projects through which they actively engage in a broad spectrum of tasks integral to statistical inquiry, in the authentic context of a real-world application. In keeping with these findings, we share an implementation of…
American History Laboratory Project. Final Report.
ERIC Educational Resources Information Center
Taylor, William R.
The results of an experimental project in American history which introduced to students the methods of historical investigation in specific historical areas through small group research rather than through the college survey course are described in this report. Discussed are (1) the course organization, consisting of two semester units in which…
34 CFR 379.10 - What types of project activities are required of each grantee under this program?
Code of Federal Regulations, 2010 CFR
2010-07-01
... placement and career advancement opportunities; (b) Provide job development, job placement, and career... job and career availability within the community, consistent with the current and projected local employment opportunities identified by the local workforce investment board for the community under section...
Project Basic Instructional Guide. Instructional Resources. Volume IV. World of Work.
ERIC Educational Resources Information Center
Maryland State Dept. of Education, Baltimore.
Designed to provide a listing of suggested resources to support the Project Basic instructional guide on the world of work, this bibliography consists of annotated listings of student-use materials (library books, films, filmstrips, kits, records, games, audio and videotapes, filmloops, transparencies, periodicals, and pamphlets) arranged…
Power Market Design | Grid Modernization | NREL
Power Market Design Power Market Design NREL researchers are developing a modeling platform to test (a commercial electricity production simulation model) and FESTIV (the NREL-developed Flexible Energy consisting of researchers in power systems and economics Projects Grid Market Design Project The objective of
40 CFR 35.915 - State priority system and project priorty list.
Code of Federal Regulations, 2013 CFR
2013-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915 State priority system and project priorty list. Construction grants will be awarded... State priority system and list must be designed to achieve optimum water quality management consistent...
40 CFR 35.915 - State priority system and project priorty list.
Code of Federal Regulations, 2012 CFR
2012-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915 State priority system and project priorty list. Construction grants will be awarded... State priority system and list must be designed to achieve optimum water quality management consistent...
40 CFR 35.915 - State priority system and project priorty list.
Code of Federal Regulations, 2011 CFR
2011-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915 State priority system and project priorty list. Construction grants will be awarded... State priority system and list must be designed to achieve optimum water quality management consistent...
40 CFR 35.915 - State priority system and project priorty list.
Code of Federal Regulations, 2014 CFR
2014-07-01
... OTHER FEDERAL ASSISTANCE STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.915 State priority system and project priorty list. Construction grants will be awarded... State priority system and list must be designed to achieve optimum water quality management consistent...
40 CFR 35.2015 - State priority system and project priority list.
Code of Federal Regulations, 2010 CFR
2010-07-01
... achieve optimum water quality management consistent with the goals and requirements of the Act. All..., needs and priorities set forth in areawide water quality management plans, and any other factors... priority to projects in priority water quality areas. The priority system may also include the...
Project Physics Tests 1, Concepts of Motion.
ERIC Educational Resources Information Center
Harvard Univ., Cambridge, MA. Harvard Project Physics.
Test items relating to Project Physics Unit 1 are presented in this booklet, consisting of 70 multiple-choice and 20 problem-and-essay questions. Concepts of motion are examined with respect to velocities, acceleration, forces, vectors, Newton's laws, and circular motion. Suggestions are made for time consumption in answering some items. Besides…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-03
... Upgrade Project EIS AGENCY: Bonneville Power Administration (BPA), Department of Energy (DOE). ACTION... involvement. SUMMARY: BPA intends to prepare an EIS in accordance with the National Environmental Policy Act... consist of a combination of reinforcements of five existing BPA substations, placement of new conductor on...
ERIC Educational Resources Information Center
Hinshaw, Craig
2010-01-01
In this article, the author describes an art project inspired by Henry Moore's sculptures. This project consists of two activities. In the first activity, students select, sand and stain a wood block that would become a base for their plaster sculpture. This activity would keep the students independently engaged (classroom management) while the…
ASTM Validates Air Pollution Test Methods
ERIC Educational Resources Information Center
Chemical and Engineering News, 1973
1973-01-01
The American Society for Testing and Materials (ASTM) has validated six basic methods for measuring pollutants in ambient air as the first part of its Project Threshold. Aim of the project is to establish nationwide consistency in measuring pollutants; determining precision, accuracy and reproducibility of 35 standard measuring methods. (BL)
Chapin Hall Center for Children.
ERIC Educational Resources Information Center
Chicago Univ., IL. Chapin Hall Center for Children.
This document consists of two separate publications: (1) "The Power of Knowing", a brief 12-page description of the Chapin Hall Center for Children, and (2) "Projects and Publications", a 67-page list of the center's projects and publications as of Autumn 1997. "The Power of Knowing" describes the Chapin Hall Center…
Student Perceptions on Live-Case Projects: Undergraduate Marketing Research
ERIC Educational Resources Information Center
Gundala, Raghava Rao; Singh, Mandeep; Baldwin, Andrew
2014-01-01
This paper is an investigation into undergraduate students' perceptions on use of live projects as a teaching pedagogy in marketing research courses. Students in undergraduate marketing research courses from fall 2009 to spring 2013 completed an online questionnaire consisting of 17 items. The results suggested that student understanding of…
76 FR 53663 - Sierra County Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-29
... provide advice and recommendations to the Forest Service concerning projects and funding consistent with... and vote on projects submitted for funding and the expenditure of Title II funds benefiting National Forest System lands in Sierra County. DATES: The meeting will be held Monday, September 12, 2011 at 9 a.m...
NASA Technical Reports Server (NTRS)
1983-01-01
A photovoltaic Metallization Research forum, under the sponsorship of the Flat-Plate Solar Array Project consisted of five sessions, covering: (1) the current status of metallization systems, (2) system design, (3) thick-film metallization, (4) advanced techniques, and (5) future metallization challenges.
ALI--A Digital Archive of DAISY Books
ERIC Educational Resources Information Center
Forsberg, Asa
2007-01-01
ALI is a project to develop an archive for talking books produced by the Swedish universities. The universities produce talking books from the mandatory literature for students with reading disabilities, including mostly journal articles, book chapters and texts written by teachers. The project group consists of librarians and co-ordinators for…
The International Research Training Group (GRK532): Practicing Cross-Border Postgraduate Education
ERIC Educational Resources Information Center
Ehses, Markus; Veith, Michael
2009-01-01
In 1999, the International Research Training Group "GRK532" was founded as a pilot project for cross-border European postgraduate education along the German/French/Luxembourg borders. The project consists of an interdisciplinary research programme on synthesis, isolation and characterization of new materials accompanied by an ambitious…
Changing Technology and Work: Northern Telecom. CAW Technology Project.
ERIC Educational Resources Information Center
Robertson, David; Wareham, Jeff
A project to examine the implications of technological change at Northern Telecom consisted of two major components: a technological survey and case study research. A questionnaire that contained more than 90 questions on technological change was distributed through local union technology committee meetings in Brampton, London, Belleville, and…
Kinder Lernen Deutsch. Materials Project Part I. Revised.
ERIC Educational Resources Information Center
American Association of Teachers of German.
The Kinder Lernen Deutsch (LKD) materials evaluation project identifies materials appropriate for the elementary school German classrooms in grades K-8. This guide consists of an annotated bibliography, with ratings, of these materials. The guiding principles by which the materials were assessed were: use of the communicative approach; integration…
Ecology in the Classroom [Complete Kit].
ERIC Educational Resources Information Center
Audubon Naturalist Society of the Central Atlantic States, Inc., Washington, DC.
Designed specifically for use in inner city schools, this ecology project for grades four through six attempts to help children develop an appreciation of the out-of-doors and an awareness of the natural features of their own environment. The eight-week project consists of units about interdependence, plants, pollination, insects and their…
Agricultural Construction Volume I. Arc Welding Project Construction. Instructor's Guide.
ERIC Educational Resources Information Center
Brzozowski, Dick; Admire, Myron
This guide contains instructor's materials for teaching a secondary agricultural construction course consisting of instructional units on arc welding (8 lessons) and project construction (14 lessons). The materials for each unit include student objectives, a list of competencies from which the objectives were derived, suggestions for motivating…
Ariunbileg, Sodov; Badarch, Gombosuren; Berzin, Nikolai A.; Bulgatov, Alexander N.; Chimed, Noosoi; Deikunenko, Aleksey V.; Dejidmaa, Gunchin; Diggles, Michael F.; Distanov, Elimir G.; Dorjgotov, Dangindorjiin; Gerel, Ochir; Gordienko, Ivan V.; Gotovsuren, Ayurzana; Hwang, Duk-Hwan; Khanchuk, Alexander I.; Koch, Richard D.; Miller, Robert J.; Nokleberg, Warren J.; Obolenskiy, Alexander A.; Ogasawara, Masatsugu; Orolmaa, Demberel; Oxman, Vladimir S.; Parfenov, Leonid M.; Popeko, Ludmila I.; Prokopiev, Andrey V.; Smelov, Alexander P.; Sotnikov, Vitaliy I.; Sudo, Sadahisa; Timofeev, Vladimir F.; Tret'yakov, Felix F.; Vernikovsky, Valery A.; Ye, Mao; Zadgenizov, Alexander P.
1999-01-01
This report consists of preliminary data tables, maps, and interpretative articles compiled in late 1997 and early 1998 for a new project on the Mineral Resources, Metallogenesis, and Tectonics of Northeast Asia (Eastern and Southern Siberia, Mongolia, North-eastern China, South Korea, and Japan).
Incorporating Applied Undergraduate Research in Senior to Graduate Level Remote Sensing Courses
ERIC Educational Resources Information Center
Henley, Richard B.; Unger, Daniel R.; Kulhavy, David L.; Hung, I-Kuai
2016-01-01
An Arthur Temple College of Forestry and Agriculture (ATCOFA) senior spatial science undergraduate student engaged in a multi-course undergraduate research project to expand his expertise in remote sensing and assess the applied instruction methodology employed within ATCOFA. The project consisted of performing a change detection…
REDUCTION OF USE OF PETROLEUM ENERGY RESOURCES BY CONVERSION OF WASTE COOKING OILS INTO DIESEL FUEL
This project has a dual objective of providing hands-on experience to undergraduate engineering students and producing biodiesel fuel from a used cooking oil feedstock. The project consists of three phases: Phase I - process development and construction of a pilot plant; Phase...
Training the Trainer: Leadership Reinforcement for Consumers.
ERIC Educational Resources Information Center
Clark, Noreen M.; And Others
The program of consumer education for Comprehensive Health Planning was developed to assist consumers to assume leadership roles in community decision-making with regard to health services. This paper presents a description of a project that was developed to train leaders for the program. The project consisted of special, advanced training…
We use GCAM-USA to examine the sensitivity of energy demands and resulting pollutant emissions and health impacts to differing population projections. The population projections are based on future fertility, mortality, migration and education assumptions consistent with the five...
Cross-Cultural Validation of TEMAS, a Minority Projective Test.
ERIC Educational Resources Information Center
Costantino, Giuseppe; And Others
The theoretical framework and cross-cultural validation of Tell-Me-A-Story (TEMAS), a projective test developed to measure personality development in ethnic minority children, is presented. The TEMAS test consists of 23 chromatic pictures which incorporate the following characteristics: (1) representation of antithetical concepts which the…
78 FR 30267 - Humboldt County (CA) Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-22
... Community Self-Determination Act (Pub.L. 112-141) (the Act) and operates in compliance with the Federal... provide advice and recommendations to the Forest Service concerning projects and funding consistent with... review prior year project's progress. Should the Secure Rural Schools Act be reauthorized, the purpose of...
77 FR 52309 - Southwest Montana Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-29
... Community Self-Determination Act (Pub. L. 112-141) (the Act) and operates in compliance with the Federal... provide advice and recommendations to the Forest Service concerning projects and funding consistent with... recommend projects authorized under title II of the Act. DATES: The meeting will be held September 20, 2012...
77 FR 47360 - Del Norte Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-08
... Community Self-Determination Act (Pub. L. 112-141) (the Act) and operates in compliance with the Federal... provide advice and recommendations to the Forest Service concerning projects and funding consistent with... 2011 project status and to discuss process the Committee will use to review and recommend fiscal year...
77 FR 47812 - Yakutat Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-10
... Yakutat, Alaska. The committee is authorized under the Secure Rural Schools and Community Self... recommendations to the Forest Service concerning projects and funding consistent with the title II [[Page 47813... projects authorized under title II of the Act. DATES: The meeting will be held September 7, 2012, 6 p.m...
78 FR 23741 - Flathead Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-22
... Kalispell, Montana. The committee is authorized under the Secure Rural Schools and Community Self... recommendations to the Forest Service concerning projects and funding consistent with the Title II of the Act. The meeting is open to the public. The purpose of the meeting is to re-evaluate project proposals for 2013 due...
77 FR 55799 - Eleven Point Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-11
... in Winona, Missouri. The committee is authorized under the Secure Rural Schools and Community Self... recommendations to the Forest Service concerning projects and funding consistent with title II of the Act. The meeting is open to the public. The purpose of the meeting is to review and recommend projects authorized...
77 FR 51752 - Medbow-Routt Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-27
... Community Self-Determination Act (Pub. L. 112- 141) (the Act) and operates in compliance with the Federal... provide advice and recommendations to the Forest Service concerning projects and funding consistent with... recommend projects authorized under title II of the Act, as well as to update RAC members on the progress of...
77 FR 56179 - Humboldt (NV) Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-12
... committee is authorized under the Secure Rural Schools and Community Self-Determination Act (Pub. L. 112-141... Service concerning projects and funding consistent with the title II of the Act. The purpose of the meeting is to complete any final business needed to recommend projects to the Humboldt-Toiyabe Forest...
77 FR 51966 - Upper Rio Grande Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
... Schools and Community Self-Determination Act (Pub. L. 110- 343) and in compliance with the Federal... provide advice and recommendations to the Forest Service concerning projects and funding consistent with... and recommend project proposals to be funded with the title II of the Act. DATES: The meeting will be...
77 FR 50081 - Eleven Point Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-20
... in Winona, Missouri. The committee is authorized under the Secure Rural Schools and Community Self... recommendations to the Forest Service concerning projects and funding consistent with the title II of the Act. The meeting is open to the public. The purpose of the meeting is to review and recommend projects authorized...
77 FR 50676 - Hood/Willamette Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-22
... will meet in Salem, Oregon. The committee is authorized under the Secure Rural Schools and Community... and recommendations to the Forest Service concerning projects and funding consistent with the title II... projects authorized under title II of the Act. DATES: The meeting will be held on September 27, 2012, at 9...
77 FR 50082 - Humboldt County, CA Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-20
... Community Self-Determination Act (Pub. L. 112-141) (the Act) and operates in compliance with the Federal... provide advice and recommendations to the Forest Service concerning projects and funding consistent with... review and recommend fiscal year 2012 project proposals. DATES: The meetings will be held September 18...
77 FR 51513 - Lawrence County Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-24
... Community Self-Determination Act (Pub. L. 112-141) (the Act) and operates in compliance with the Federal... provide advice and recommendations to the Forest Service concerning projects and funding consistent with... and recommend projects authorized under title II of the Act. DATES: The meeting will be held September...
49 CFR 80.13 - Threshold criteria.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 1 2010-10-01 2010-10-01 false Threshold criteria. 80.13 Section 80.13... § 80.13 Threshold criteria. (a) To be eligible to receive Federal credit assistance under this part, a project shall meet the following five threshold criteria: (1) The project shall be consistent with the...
49 CFR 80.13 - Threshold criteria.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 1 2014-10-01 2014-10-01 false Threshold criteria. 80.13 Section 80.13... § 80.13 Threshold criteria. (a) To be eligible to receive Federal credit assistance under this part, a project shall meet the following five threshold criteria: (1) The project shall be consistent with the...
36 CFR 1206.22 - What type of proposal is eligible for a publications grant?
Code of Federal Regulations, 2014 CFR
2014-07-01
... projects include the production of: (1) Documentary editions that involve collecting, compiling... records; (2) Microfilm editions consisting of organized collections of images of original sources, usually without transcription and annotations; (3) Electronic editions consisting of organized collections of...
36 CFR 1206.22 - What type of proposal is eligible for a publications grant?
Code of Federal Regulations, 2011 CFR
2011-07-01
... projects include the production of: (1) Documentary editions that involve collecting, compiling... records; (2) Microfilm editions consisting of organized collections of images of original sources, usually without transcription and annotations; (3) Electronic editions consisting of organized collections of...
36 CFR § 1206.22 - What type of proposal is eligible for a publications grant?
Code of Federal Regulations, 2013 CFR
2013-07-01
... projects include the production of: (1) Documentary editions that involve collecting, compiling... records; (2) Microfilm editions consisting of organized collections of images of original sources, usually without transcription and annotations; (3) Electronic editions consisting of organized collections of...
ERIC Educational Resources Information Center
Orsini-Jones, Marina
2004-01-01
This paper reports on the results of an action research project at Coventry University that consisted of the evaluation of a curriculum innovation supported by the use of the Virtual Learning Environment (VLE) WebCT, i.e. a new module (course): "Academic and Professional Skills for Language Learning". The project was carried out…
Live from Space Station Learning Technologies Project
NASA Technical Reports Server (NTRS)
2001-01-01
This is the Final Report for the Live From Space Station (LFSS) project under the Learning Technologies Project FY 2001 of the MSFC Education Programs Department. AZ Technology, Inc. (AZTek) has developed and implemented science education software tools to support tasks under the LTP program. Initial audience consisted of 26 TreK in the Classroom schools and thousands of museum visitors to the International Space Station: The Earth Tour exhibit sponsored by Discovery Place museum.
Carbon Nanotubules: Building Blocks for Nanometer-Scale Engineering
NASA Technical Reports Server (NTRS)
Sinnott, Susan B.
1999-01-01
The proposed work consisted of two projects: the investigation of fluid permeation and diffusion through ultrafiltration membranes composed of carbon nanotubules and the design and study of molecular transistors composed of nanotubules. The progress made on each project is summarized and also discussion about additional projects, one of which is a continuation of work supported by another grant, is included. The first project was Liquid Interactions within a Nanotubule Membrane. The second was the design of nanometer-scale hydrocarbon electronic devices. The third was the investigation of Mechanical properties of Nanotubules and Nanotubule bundles. The fourth project was to investigate the growth mechanisms of Carbon Nanotubules.
ERIC Educational Resources Information Center
Johns, R. L.
Evidence presented by the National School Food Service and Nutrition Education Finance Project shows clearly that present State and federal legislation affecting the school food service program is not consistent with the basic values and beliefs of this country, nor is that legislation consistent with the legitimate and appropriate purposes of…
WE-AB-207A-12: HLCC Based Quantitative Evaluation Method of Image Artifact in Dental CBCT
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, Y; Wu, S; Qi, H
Purpose: Image artifacts are usually evaluated qualitatively via visual observation of the reconstructed images, which is susceptible to subjective factors due to the lack of an objective evaluation criterion. In this work, we propose a Helgason-Ludwig consistency condition (HLCC) based evaluation method to quantify the severity level of different image artifacts in dental CBCT. Methods: Our evaluation method consists of four step: 1) Acquire Cone beam CT(CBCT) projection; 2) Convert 3D CBCT projection to fan-beam projection by extracting its central plane projection; 3) Convert fan-beam projection to parallel-beam projection utilizing sinogram-based rebinning algorithm or detail-based rebinning algorithm; 4) Obtain HLCCmore » profile by integrating parallel-beam projection per view and calculate wave percentage and variance of the HLCC profile, which can be used to describe the severity level of image artifacts. Results: Several sets of dental CBCT projections containing only one type of artifact (i.e. geometry, scatter, beam hardening, lag and noise artifact), were simulated using gDRR, a GPU tool developed for efficient, accurate, and realistic simulation of CBCT Projections. These simulated CBCT projections were used to test our proposed method. HLCC profile wave percentage and variance induced by geometry distortion are about 3∼21 times and 16∼393 times as large as that of the artifact-free projection, respectively. The increase factor of wave percentage and variance are 6 and133 times for beam hardening, 19 and 1184 times for scatter, and 4 and16 times for lag artifacts, respectively. In contrast, for noisy projection the wave percentage, variance and inconsistency level are almost the same with those of the noise-free one. Conclusion: We have proposed a quantitative evaluation method of image artifact based on HLCC theory. According to our simulation results, the severity of different artifact types is found to be in a following order: Scatter>Geometry>Beam hardening>Lag>Noise>Artifact-free in dental CBCT.« less
NASA Astrophysics Data System (ADS)
Kauark-Leite, L.; Vinçon-Leite, B.; Deroubaix, J. F.; Loireau, A.; Silveira, D.; Haddad, E.
2008-08-01
In the rural areas of the developing countries, the access to water supply and sanitation services is still largely inadequate. Poor governance of the water sector is frequently singled out as a cause and reforms are required. Studies analyzing the great diversity of restructuring efforts currently being undertaken in the water sector have not succeeded in determining the most appropriate institutional and economic framework for such reforms. Moreover they underline the lack of documentation on actual projects and call for concrete models and tools for improving water and sanitation services (WSS) and for adapting water utility practice to real conditions. In this context, the Vida no Vale (Life in the Valley) project is aimed at bringing universal access to WSS for all inhabitants of both urban and rural areas, in the north-eastern area of the Brazilian State of Minas Gerais. The project takes sustainable development as its guiding principle, and relies on the joint implementation of an innovative technical design, a governance model involving public participation and subsidiarity, and an economic structure combining financial viability and social equity. Designed at a consistent geographical and hydrological scale, it includes the creation of a regional subsidiary of the existing state water company as a keystone element. The institutional organisation also relies on the creation of a public board consisting of the 92 municipalities of the project region and of the State of Minas Gerais. This board will be in charge of the system's governance. This paper presents the first step of the project (2006), consisting of a feasibility study and the implementation of 9 pilot sub-projects. During the feasibility study, the supply, demand and capacity to pay for water services were defined, existing infrastructure appraised, the necessary amount of investment assessed and an innovative operational model and a sustainable management system, including civil society participation, defined. The main features of the Vida no Vale project have been tested in 9 pilot sub-projects, and implemented in municipalities chosen for their low Human Development Index and for the lack of WSS, in both urban and rural areas. A second phase corresponding to the project's final implementation will run from 2007 to 2011. The Vida no Vale project design resulted in a logical and extensive framework which could be used for developing similar WSS projects in other poor, rural regions, its adaptiveness being a key feature for taking into account the specific, local conditions.
Matthews, Kylie L; Palmer, Michelle A; Capra, Sandra M
2017-11-08
Using standardised terminology in acute care has encouraged consistency in patient care and the evaluation of outcomes. As such, the Nutrition Care Process (NCP) and Nutrition Care Process Terminology (NCPT) may assist dietitian nutritionists in the delivery of high quality nutrition care worldwide; however, limited research has been conducted examining the consistency and accuracy of its use. We aimed to examine the NCPT that dietitian nutritionists would use to formulate a diagnostic statement relating to refeeding syndrome (RFS). A multimethod action research approach was used, incorporating two projects. The first was a survey examining Australian dietitian nutritionists' (n = 195) opinions regarding NCPT use in cases of RFS. To establish if results were similar internationally, an interview was then conducted with 22 dietitian nutritionists working within 10 different countries. 'Imbalance of nutrients' was only identified as a correct code by 17% of respondents in project 1. No mention of this term was made in project 2. Also 86% of respondents incorrectly selected more than one diagnostic code. The majority of respondents (80%, n = 52/65) who incorrectly selected 'Malnutrition', without also selecting 'Imbalance of nutrients', selected 'reduce intake' as an intervention, suggesting some misunderstanding in the requirement for interrelated diagnoses, interventions and goals. Our findings demonstrate that there is limited accuracy and consistency in selecting nutritional diagnostic codes in relation to RFS. Respondents also demonstrated limited knowledge regarding appropriate application of the NCP and NCPT. Implementation practices may require further refinement, as accurate and consistent use is required to procure the benefits of standardised terminology. © 2017 Dietitians Association of Australia.
The National Map Pilot Projects
,
2002-01-01
The U.S. Geological Survey (USGS) is developing The National Map to be a seamless, continuously maintained, and nationally consistent set of online, public domain, geographic base information. The National Map will serve as a foundation for integrating, sharing, and using other government and private sector data easily and consistently.
12 CFR 560.101 - Real estate lending standards.
Code of Federal Regulations, 2010 CFR
2010-01-01
... estate lending policies adopted pursuant to this section must: (i) Be consistent with safe and sound... institution's policies must be comprehensive, and consistent with safe and sound lending practices, and must..., construction, and absorption rates. • Current and projected lease terms, rental rates, and sales prices...
Developing consistent time series landsat data products
USDA-ARS?s Scientific Manuscript database
The Landsat series satellite has provided earth observation data record continuously since early 1970s. There are increasing demands on having a consistent time series of Landsat data products. In this presentation, I will summarize the work supported by the USGS Landsat Science Team project from 20...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Galowitz, Stephen
The primary objective of the Project was to maximize the productive use of the substantial quantities of waste landfill gas generated and collected at the Central Landfill in Johnston, Rhode Island. An extensive analysis was conducted and it was determined that utilization of the waste gas for power generation in a combustion turbine combined cycle facility was the highest and best use. The resulting project reflected a cost effective balance of the following specific sub-objectives. 1) Meet environmental and regulatory requirements, particularly the compliance obligations imposed on the landfill to collect, process and destroy landfill gas. 2) Utilize proven andmore » reliable technology and equipment. 3) Maximize electrical efficiency. 4) Maximize electric generating capacity, consistent with the anticipated quantities of landfill gas generated and collected at the Central Landfill. 5) Maximize equipment uptime. 6) Minimize water consumption. 7) Minimize post-combustion emissions. To achieve the Project Objective the project consisted of several components. 1) The landfill gas collection system was modified and upgraded. 2) A State-of-the Art gas clean up and compression facility was constructed. 3) A high pressure pipeline was constructed to convey cleaned landfill gas from the clean-up and compression facility to the power plant. 4) A combined cycle electric generating facility was constructed consisting of combustion turbine generator sets, heat recovery steam generators and a steam turbine. 5) The voltage of the electricity produced was increased at a newly constructed transformer/substation and the electricity was delivered to the local transmission system. The Project produced a myriad of beneficial impacts. 1) The Project created 453 FTE construction and manufacturing jobs and 25 FTE permanent jobs associated with the operation and maintenance of the plant and equipment. 2) By combining state-of-the-art gas clean up systems with post combustion emissions control systems, the Project established new national standards for best available control technology (BACT). 3) The Project will annually produce 365,292 MWh's of clean energy. 4) By destroying the methane in the landfill gas, the Project will generate CO{sub 2} equivalent reductions of 164,938 tons annually. The completed facility produces 28.3 MWnet and operates 24 hours a day, seven days a week.« less
Customer satisfaction assessment at the Pacific Northwest National Laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
DN Anderson; ML Sours
2000-03-23
The Pacific Northwest National Laboratory (PNNL) is developing and implementing a customer satisfaction assessment program (CSAP) to assess the quality of research and development provided by the laboratory. This report presents the customer survey component of the PNNL CSAP. The customer survey questionnaire is composed of two major sections: Strategic Value and Project Performance. Both sections contain a set of questions that can be answered with a 5-point Likert scale response. The strategic value section consists of five questions that are designed to determine if a project directly contributes to critical future national needs. The project Performance section consists ofmore » nine questions designed to determine PNNL performance in meeting customer expectations. A statistical model for customer survey data is developed and this report discusses how to analyze the data with this model. The properties of the statistical model can be used to establish a gold standard or performance expectation for the laboratory, and then to assess progress. The gold standard is defined using laboratory management input--answers to four questions, in terms of the information obtained from the customer survey: (1) What should the average Strategic Value be for the laboratory project portfolio? (2) What Strategic Value interval should include most of the projects in the laboratory portfolio? (3) What should average Project Performance be for projects with a Strategic Value of about 2? (4) What should average Project Performance be for projects with a Strategic Value of about 4? To be able to provide meaningful answers to these questions, the PNNL customer survey will need to be fully implemented for several years, thus providing a link between management perceptions of laboratory performance and customer survey data.« less
Krützfeldt, Nils O.E.; Logerot, Priscilla; Kubke, M. Fabiana; Wild, J. Martin
2013-01-01
Three nuclei of the lateral lemniscus are present in the zebra finch, ventral (LLV), intermediate (LLI), and dorsal (LLD). LLV is separate from the superior olive (OS): it lies closer to the spinal lemniscus and extends much further rostrally around the pontine periphery. LLI extends from a caudal position ventrolateral to the principal sensory trigeminal nucleus (LLIc) to a rostral position medial to the ventrolateral parabrachial nucleus (LLIr). LLD consists of posterior (LLDp) and anterior (LLDa) parts, which are largely coextensive rostrocaudally, although LLDa lies medial to LLDp. All nuclei are identifiable on the basis of cytochrome oxidase activity. The cochlear nucleus angularis (NA) and the third-order nucleus laminaris (NL) project on OS predominantly ipsilaterally, on LLV and LLI predominantly contralaterally, and on LLD contralaterally only. The NA projections are heavier than those of NL and differ from them primarily in their terminations within LLD: NA projects to LLDp, whereas NL projects to LLDa. In this the projections are similar to those in the barn owl (Takahashi and Konishi [1988] J Comp Neurol 274:212–238), in which time and intensity pathways remain separate as far as the central nucleus of the inferior colliculus (MLd). In contrast, in the zebra finch, although NA and NL projections remain separate within LLD, the projections of LLDa and LLDp become intermixed within MLd (Wild et al., J Comp Neurol, this issue), consistent with the intermixing of the direct NA and NL projections to MLd (Krützfeldt et al., J Comp Neurol, this issue). J. Comp. Neurol. 518:2135–2148, 2010. PMID:20394062
Bigfoot Field Manual, Version 2.1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Campbell, J.L.; Burrows, S.; Gower, S.T.
1999-09-01
The BigFoot Project is funded by the Earth Science Enterprise to collect and organize data to be used in the National Aeronautics and Space Administration's Earth Observing System (EOS) Validation Program. The data collected by the BigFoot Project are unique in being ground-based observations coincident with satellite overpasses. In addition to collecting data, the BigFoot project will develop and test new algorithms for scaling point measurements to the same spatial scales as the EOS satellite products. This BigFoot Field Manual will be used to achieve completeness and consistency of data collected at four initial BigFoot sites and at future sitesmore » that may collect similar validation data. Therefore, validation datasets submitted to the Oak Ridge National Laboratory Distributed Active Archive Center that have been compiled in a manner consistent with the field manual will be especially valuable in the validation program.« less
NASA Technical Reports Server (NTRS)
1990-01-01
Lunar base projects, including a reconfigurable lunar cargo launcher, a thermal and micrometeorite protection system, a versatile lifting machine with robotic capabilities, a cargo transport system, the design of a road construction system for a lunar base, and the design of a device for removing lunar dust from material surfaces, are discussed. The emphasis on the Gulf of Mexico project was on the development of a computer simulation model for predicting vessel station keeping requirements. An existing code, used in predicting station keeping requirements for oil drilling platforms operating in North Shore (Alaska) waters was used as a basis for the computer simulation. Modifications were made to the existing code. The input into the model consists of satellite altimeter readings and water velocity readings from buoys stationed in the Gulf of Mexico. The satellite data consists of altimeter readings (wave height) taken during the spring of 1989. The simulation model predicts water velocity and direction, and wind velocity.
Development of Si(1-x)Ge(x) technology for microwave sensing applications
NASA Technical Reports Server (NTRS)
Mena, Rafael A.; Taub, Susan R.; Alterovitz, Samuel A.; Young, Paul E.; Simons, Rainee N.; Rosenfeld, David
1993-01-01
The progress for the first year of the work done under the Director's Discretionary Fund (DDF) research project entitled, 'Development of Si(1-x)Ge(x) Technology for Microwave Sensing Applications.' This project includes basic material characterization studies of silicon-germanium (SiGe), device processing on both silicon (Si) and SiGe substrates, and microwave characterization of transmission lines on silicon substrates. The material characterization studies consisted of ellipsometric and magneto-transport measurements and theoretical calculations of the SiGe band-structure. The device fabrication efforts consisted of establishing SiGe device processing capabilities in the Lewis cleanroom. The characterization of microwave transmission lines included studying the losses of various coplanar transmission lines and the development of transitions on silicon. Each part of the project is discussed individually and the findings for each part are presented. Future directions are also discussed.
An overview of results from the GEWEX radiation flux assessment
NASA Astrophysics Data System (ADS)
Raschke, E.; Stackhouse, P.; Kinne, S.; Contributors from Europe; the USA
2013-05-01
Multi-annual radiative flux averages of the International Cloud Climatology Project (ISCCP), of the GEWEX - Surface Radiation Budget Project (SRB) and of the Clouds and Earth Radiative Energy System (CERES) are compared and analyzed to characterize the Earth's radiative budget, assess differences and identify possible causes. These satellite based data-sets are also compared to results of a median model, which represents 20 climate models, that participated in the 4th IPCC assessment. Consistent distribution patterns and seasonal variations among the satellite data-sets demonstrate their scientific value, which would further increase if the datasets would be reanalyzed with more accurate and consistent ancillary data.
Nuclear Thermal Propulsion Technology - Summary of FY 1991 Interagency Panel Planning
NASA Technical Reports Server (NTRS)
Clark, John S.; Mcdaniel, Patrick; Howe, Steven; Stanley, Marland
1991-01-01
An Interagency (NASA/DOE/DOD) technical panel has been working in 1991 to evaluate nuclear thermal propulsion (NTP) concepts on a consistent basis, and to continue technology development project planning for a joint project in nuclear propulsion for Space Exploration Initiative (SEI). This paper summarizes the efforts of the panel to date and summarizes the technology plans defined for NTP. Concepts were categorized based on probable technology readiness data, and innovative 'proof-of-concept' tests and analyses were defined. While further studies will be required to provide a consistent comparison of all of the NTP concepts, the current status of the studies is presented.
Introduction of Special Physics Topics (Geophysics) Through the Use of Physics Laboratory Projects
ERIC Educational Resources Information Center
Parker, R. H.; Whittles, A. B. L.
1970-01-01
Describes the objectives and content of a physics laboratory program for freshman students at the British Columbia Institute of Technology. The first part of the program consists of basic physics experiments, while the second part emphasizes student work on projects in geophysics that have direct technical applications. (LC)
Project S.P.I.C.E.: Special Partnership in Career Education. Final Report.
ERIC Educational Resources Information Center
Emerson, Debby H.; And Others
The final report discusses Project SPICE (Special Partnership in Career Education) which produced a career awareness curriculum consisting of an implementation guide, and six teaching modules intended for use with educable mentally handicapped students (ages 11-to-13 years). Noted are the following program objectives (based on the National…
ERIC Educational Resources Information Center
Wessel, Janet A.
The project developed and evaluated an individualized physical education curriculum (called I CAN) for trainable mentally retarded children, ages 5-14 years. The instructional system consists of a set of primary psychomotor skills curriculum resource materials for individualizing instruction and a competency-based teaching guide for…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-19
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 7320-042] Erie Boulevard...: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC... Project consists of: (1) A 201-foot-long, 32- foot-high maximum height concrete gravity-type dam having a...
ERIC Educational Resources Information Center
Allan, George
1999-01-01
A student-centered learning model for a course on information systems project management consisted of individual study and group discussion with facilitator guidance. Data from session records, repertory grids, and a learning network diagram showed that interactive learning was more effective and students took responsibility, although some…
A Manual for Implementation of ABC Video Duplication Projects.
ERIC Educational Resources Information Center
Hill, Joseph, Ed.
The ABC (Appalachian BOCES Consortium) consists of 10 BOCES (Boards of Cooperative Educational Services) which serve the 14 southern counties of New York State designated as Appalachia. Each year since 1974, the ABC has participated in regional video duplication projects, which have yielded a total of nearly 4,000 video titles. The complexity of…
Use of FIA plot data in the LANDFIRE project
Chris Toney; Matthew Rollins; Karen Short; Tracey Frescino; Ronald Tymcio; Birgit Peterson
2007-01-01
LANDFIRE is an interagency project that will generate consistent maps and data describing vegetation, fire, and fuel characteristics across the United States within a 5-year timeframe. Modeling and mapping in LANDFIRE depend extensively on a large database of georeferenced field measurements describing vegetation, site characteristics, and fuel. The LANDFIRE Reference...
Title III: Curricular Development for Secondary Learning Disabilities. Final Report.
ERIC Educational Resources Information Center
Goodman, Libby
Presented is the final report of a 2-year project to develop an examplary model classroom program and curriculum for the secondary learning disabled student. Section I consists of completed forms entitled Project Completion Report, Termination Report, and Equipment Inventory. Outlined in Section II is information on the following project…
Project: Ways to Improve Education in Desegregated Schools (WIEDS). [Appendices for Final Report.
ERIC Educational Resources Information Center
Roberson, Don R.; And Others
This document consists of a literature review and the description of a field study undertaken as part of a pilot research project focusing on improving education in desegregated public schools. The review documents the organization and successful programmatic strategies of school integration. Findings are presented in terms of administrative and…
Essential KPIs for School Nutrition Program Success
ERIC Educational Resources Information Center
Rushing, Keith
2017-01-01
Purpose/Objectives: The purpose of the project was to develop a research based resource to support SN professionals in effectively utilizing KPIs to manage their programs. Methods: This project consisted of four phases. In Phase 1, a think tank of eight school nutrition professionals identified the general topic areas and format for the resource.…
PEEEC [Project for Early Education of Exceptional Children] Outreach: Annual Report 1980-1981.
ERIC Educational Resources Information Center
Millican, Jerri; Kibler, Robert G.
The document consists of the final report of the PEEEC (Project for Early Education of Exceptional Children) Outreach program, a program to stimulate high quality programs for preschool handicapped children and families in Kentucky. Following a definition of terms are sections outlining goals, objectives, and activities of three program…
Summary Evaluation of Career Education Project for Buffalo Public School System.
ERIC Educational Resources Information Center
Buffalo Public Schools, NY.
Evaluation of the three-year career education project in 12 of the Buffalo, New York public schools focuses on changes in pupils' knowledge of occupational information and the clarity, consistency, and reality of vocational interests. An occupational knowledge pre/post-test and occupational interest questionnaire were administered to 359 fourth…
College Students; Justification for Digital Piracy: A Mixed Methods Study
ERIC Educational Resources Information Center
Yu, Szde
2012-01-01
A mixed methods project was devoted to understanding college students' justification for digital piracy. The project consisted of two studies, a qualitative one and a quantitative one. Qualitative interviews were conducted to identify main themes in students' justification for digital piracy, and then the findings were tested in a quantitative…
75 FR 74040 - Intent To Prepare an Environmental Impact Statement and To Conduct Scoping Meetings...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-30
... Proposed Project NextEra's proposed Project would consist of up to 100 wind turbine generators with a... roads. NextEra has secured leases with willing landowners for its wind generation turbines and related... substantial natural resources conflicts. NextEra's siting process for the wind turbine strings and associated...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-17
.../energy/wind/mohave.html . The Project is proposed to consist of up to 283 turbines, access roads, and... be supplemented with internal access/service roads to each wind turbine. Proposed ancillary... all action alternatives, Project features within the wind-farm site would include turbines aligned...
Desert Biology [Sahuarita High School Career Curriculum Project.
ERIC Educational Resources Information Center
Christensen, Larry
This course entitled "Desert Biology" is one of a series of instructional guides prepared by teachers for the Sahuarita High School (Arizona) Career Curriculum Project. It consists of seven units of study, and eight behavioral objectives relating to these units are stated. The topics covered include the selection of a study site, a climatic…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-19
... (1980, as amended), for the Calico Solar (formerly Stirling Energy Systems Solar One) Project, San... (LWCF). The project proposal includes building about 34,000, 25-kilowatt Stirling solar dish systems. Each solar dish system consists of an approximately 38-foot high by 40-foot wide solar concentrator...
"Iitaohkanao'pi--The Meeting Place Project": An Alternative Approach to Young People's Concerts
ERIC Educational Resources Information Center
Wasiak, Edwin B.
2005-01-01
This study explored alternative approaches to young people's concerts aimed at extending musical appreciations and cultural understandings while promoting interest in concert attendance among upper elementary students. The project, an artistic and cross-cultural collaboration grounded in a spirit of mutual respect, consisted of three components:…
Seeing the Light: A Classroom-Sized Pinhole Camera Demonstration for Teaching Vision
ERIC Educational Resources Information Center
Prull, Matthew W.; Banks, William P.
2005-01-01
We describe a classroom-sized pinhole camera demonstration (camera obscura) designed to enhance students' learning of the visual system. The demonstration consists of a suspended rear-projection screen onto which the outside environment projects images through a small hole in a classroom window. Students can observe these images in a darkened…
Pockets of Hope: How Students and Teachers Change the World. Series in Language and Ideology.
ERIC Educational Resources Information Center
de los Reyes, Eileen; Gozemba, Patricia A.
This book presents case studies of six "pockets of hope," democratic educational projects in which empowered students and their teachers actively engage with relevant academic and social problems. Although seemingly very different, the projects share a core commitment to democratic pedagogy and demonstrate practices consistent with…
Longitudinal Data on the Effectiveness of Mathematics Mini-Games in Primary Education
ERIC Educational Resources Information Center
Bakker, Marjoke; Van den Heuvel-Panhuizen, Marja; Robitzsch, Alexander
2015-01-01
This paper describes a dataset consisting of longitudinal data gathered in the BRXXX project. The aim of the project was to investigate the effectiveness of online mathematics mini-games in enhancing primary school students' multiplicative reasoning ability (multiplication and division). The dataset includes data of 719 students from 35 primary…
ERIC Educational Resources Information Center
Platte Technical Community Coll., Columbus, NE.
These Project TEAMS (Techniques and Education for Achieving Management Skills) instructional materials consist of five units for use in training health care administrators. Unit 1 contains materials designed to help the health care administrators increase their management skills in regard to self-awareness, time management, problem solving,…
Career Awareness Program in Bilingual Education. Project CARIBE, 1987-88. OREA Report.
ERIC Educational Resources Information Center
Berney, Tomi D.; Cerf, Charlotte
In its first year of extension funding, Project CARIBE (Career Awareness in Bilingual Education) served 376 Spanish-speaking students of limited English proficiency at Eastern District High School (Brooklyn) and Far Rockaway High School (Queens). The program consisted of English-as-a-Second-Language (ESL) instruction, native language arts (NLA),…
Project ME: A Report on the Learning Wall System.
ERIC Educational Resources Information Center
Heilig, Morton L.
The learning wall system, which consists primarily of a special wall used instead of a screen for a variety of projection purposes, is described, shown diagrammatically, and pictured. Designed to provide visual perceptual motor training on a level that would fall between gross and fine motor performance for perceptually handicapped children, the…
Chemistry [Sahuarita High School Career Curriculum Project].
ERIC Educational Resources Information Center
Lane, Robert
This course entitled "Chemistry" is one of a series of instructional guides prepared by teachers for the Sahuarita High School (Arizona) Career Curriculum Project. It consists of three packages, the first dealing with solids, liquids and solutions, the second with acids, bases and anions, and the third with cation analysis. These packages are…
Sarah J. Hale High School-Project SABER.
ERIC Educational Resources Information Center
Rosenblatt, Harold
Project SABER, which operated in Sarah J. Hale High School in South Brooklyn, New York, consisted of bilingual instructional and supportive services to 9th and 10th grade Spanish language students. Students received bilingual instruction in social studies, science, math, and Spanish. All the SABER students received English as a second language…
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-02
.... The proposed project would consist of: (1) Installation of 2 NC Sea Dragon or Red Hawk tidal turbines... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14222-000] Natural Currents... Comments, Motions To Intervene, and Competing Applications On July 13, 2011, Natural Currents Energy...
Overhead Projection Cell for Streamline Flow
ERIC Educational Resources Information Center
Waage, Harold M.
1969-01-01
Describes the construction and operation of an overhead projection apparatus designed to demonstrate streamline flow of a liquid. The apparatus consists of a Plexiglass tank containing water in which plates forming the cell are submerged, a constant level reservoir, an overflow device and a system for marking the flow lines with a dye. (LC)
Lives in Context: Facilitating Online, Cross-Course, Collaborative Service Projects
ERIC Educational Resources Information Center
Elwood, Susan A.
2014-01-01
An inquiry-based, cross-course, collaborative structure is being implemented toward a graduate program's goals of using project-based learning as a consistent, core learning experience in each course cycle. This paper focuses upon the course collaborative structure and the two key forms of assessment used in each collaborative cycle: a progressive…
The purpose of this SOP is to identify and isolate malfunctioning or damaged equipment for the NHEXAS Arizona research project. This procedure was followed to ensure consistent data custody, storage, transfer and analysis of a high quality during the Arizona NHEXAS project and t...
ERIC Educational Resources Information Center
What Works Clearinghouse, 2006
2006-01-01
"Caring School Community[TM]" ("CSC") is a modified version of a program formerly known as the "Child Development Project." The program aims to promote core values, prosocial behavior, and a schoolwide feeling of community. The program consists of four elements originally developed for the "Child Development…
Closing the Math Gap of Native American Students Identified as Learning Disabled
ERIC Educational Resources Information Center
Hankes, Judith; Skoning, Stacey; Fast, Gerald; Mason-Williams, Loretta
2013-01-01
This article serves as an overview of activities and selected assessment findings of a three-year research study titled, Closing the Mathematics Achievement Gap of Native American Students Identified as Learning Disabled Project (CMAG Project). Methods used were problem-based, consistent with those of Cognitively Guided Instruction, and culturally…
Tete a Tete: Reading Groups and Peer Learning
ERIC Educational Resources Information Center
Finlay, Sara-Jane; Faulkner, Guy
2005-01-01
This project was inspired by an awareness of the lack of engagement with the research literature by our students. The project consisted of self-help reading groups that centralized student discussion with three research objectives: to encourage students to engage with a broader range of literature, to encourage critical thinking around subject…
Special Education Management System Project Document. 2. Santa Cruz BCP Observation Booklet.
ERIC Educational Resources Information Center
Santa Cruz County Superintendent of Schools, CA.
Presented in booklet and chart form is the Behavioral Characteristics Progression (BCP), part of the Santa Cruz Special Education Management Project, consisting of 2400 observable traits grouped into 50 behavioral strands. The BCP is seen to be a nonstandardized criterion referenced tool which replaces conventional age and disability labels with…
Using models to provide a virtual test of forest treatments
Janet Sullivan; Kevin Hyde
2007-01-01
BEMRP's participation in the Bitterroot National Forest's proposed Trapper Bunkhouse Land Stewardship Project (Trapper-Bunkhouse Project) consists of two parts. One is the field study mentioned elsewhere in this ECO-Report that is looking into the effects of thinning and burning on various resources. The other part involves modeling to determine where...
78 FR 50025 - Del Norte County Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-16
... authorized under the Secure Rural Schools and Community Self-Determination Act (Act) (Pub. L. 112-141) and... Service concerning projects and funding consistent with the Title II of the Act. The meetings are open to the public. The purpose of the meetings are to review prior year project's progress and to review and...
78 FR 39252 - Ravalli County Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-01
... meet in Hamilton, MT. The committee is authorized under the Secure Rural Schools and Community Self... recommendations to the Forest Service concerning projects and funding consistent with the title II of the Act. The... monitoring of RAC projects. DATES: The meeting will be held July 23, 2013 6:30 p.m. ADDRESSES: The meeting...
78 FR 50025 - Humboldt County (CA) Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-16
... Rural Schools and Community Self- Determination Act (Act) (Pub. L. 112-141) and operates in compliance... concerning projects and funding consistent with the Title II of the Act. The meetings are open to the public. The purpose of the meetings are to review prior year project's progress and to review and recommend...
78 FR 51707 - Shasta County Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-21
...) will meet in Redding, CA. The committee is authorized under the Secure Rural Schools and Community Self... recommendations to the Forest Service concerning projects and funding consistent with the title II of the Act. The meeting is open to the public. The purpose of the meeting is to discuss the monitoring of past projects...
78 FR 57837 - Ravalli County Resource Advisory Committee
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-20
... authorized under the Secure Rural Schools and Community Self-Determination Act (Pub. L. 110-343) (the Act... concerning projects and funding consistent with the title II of the Act. The meeting is open to the public. The purpose of the meeting is to provide information regarding the monitoring of RAC projects. DATES...
ERIC Educational Resources Information Center
Platte Technical Community Coll., Columbus, NE.
These Project TEAMS (Techniques and Education for Achieving Managerial Skills) instructional materials consist of five units for use in training independent business owner/managers. The first unit contains materials which deal with management skills relating to personal characteristics of successful business people, knowledge of self and chosen…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-15
... project (Project No. 13780-000) would consist of: (1) An 85-foot-long, 100-foot-wide, 14-foot-deep excavated power canal; (2) a 95-foot-long, 100-foot-wide, 10-foot-deep excavated tailrace; (3) a 100-foot...)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/docs-filing/efiling.asp...
Common Object Library Description
2012-08-01
Information Modeling ( BIM ) technology to be successful, it must be consistently applied across many projects, by many teams. The National Building Information ...distribution is unlimited. 13. SUPPLEMENTARY NOTES 14. ABSTRACT For Building Information Modeling ( BIM ) technology to be successful, it must be... BIM standards and for future research projects. 15. SUBJECT TERMS building information modeling ( BIM ), object
ERIC Educational Resources Information Center
Platte Technical Community Coll., Columbus, NE.
These Project TEAMS (Techniques and Education for Achieving Management Skills) instructional materials consist of five units for use in training business and industrial supervisors. Unit 1 is designed to help managers in business or industry increase management skills in regard to leadership techniques, problem solving and decision making, and…
Assessment Administration Guide. Indigenous Mathematics Project. Working Paper 3.
ERIC Educational Resources Information Center
Souviney, Randall J.
The assessement materials described in this report were used by the Indigenous Mathematics Project to document various achievement and cognitive development factors at five sites in Papua New Guinea. The achievement instruments are criteria-referenced and consist of the Primary Maths Achievement Test, The Test of Arithmetic Skills, and the reading…
Reports of planetary astronomy - 1991
NASA Technical Reports Server (NTRS)
Rahe, Jurgen (Editor)
1993-01-01
This publication provides information about currently funded scientific research projects conducted in the Planetary Astronomy Program during 1991, and consists of two main sections. The first section gives a summary of research objectives, past accomplishments, and projected future investigations, as submitted by each principal investigator. In the second section, recent scientifically significant accomplishments within the Program are highlighted.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Irene Farnham
This Quality Assurance Project Plan (QAPP) provides the overall quality assurance (QA) program requirements and general quality practices to be applied to the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Underground Test Area (UGTA) Sub-Project (hereafter the Sub-Project) activities. The requirements in this QAPP are consistent with DOE Order 414.1C, Quality Assurance (DOE, 2005); U.S. Environmental Protection Agency (EPA) Guidance for Quality Assurance Project Plans for Modeling (EPA, 2002); and EPA Guidance on the Development, Evaluation, and Application of Environmental Models (EPA, 2009). The QAPP Revision 0 supersedes DOE--341, Underground Test Area Quality Assurancemore » Project Plan, Nevada Test Site, Nevada, Revision 4.« less
Kvichak River RISEC Project Resource Reconnaissance and Physical Characterization
Jarlath McEntee
2015-10-01
During the summer and fall of 2011 TerraSond Ltd. (TerraSond) completed a bathymetric survey and hydrokinetic energy assessment of the Kvichak River at Igiugig, Alaska. The purpose of this work was to characterize the initial site conditions for the design and installation of a hydrokinetic turbine to provide electric power for the village. There were six distinct phases of work for this project. The first was a literature review and investigation of prior surveys and hydrologic studies done in the area. The second, third, fourth, and fifth phases consisted of four field expeditions conducted over the summer and fall of 2011. These expeditions consisted of an initial reconnaissance, multi beam bathymetric surveys, flow velocity and discharge measurements, a survey of water levels, and detailed flow velocity studies. The final phase of the project was complete data reduction, and preparation of the final report with its accompanying map sheets and data packages. This submission contains the final report for the Kvichak River RiISEC Project in addition to weather data for Igiugig, AK, Summer 2015.
Nikazad, T; Davidi, R; Herman, G. T.
2013-01-01
We study the convergence of a class of accelerated perturbation-resilient block-iterative projection methods for solving systems of linear equations. We prove convergence to a fixed point of an operator even in the presence of summable perturbations of the iterates, irrespective of the consistency of the linear system. For a consistent system, the limit point is a solution of the system. In the inconsistent case, the symmetric version of our method converges to a weighted least squares solution. Perturbation resilience is utilized to approximate the minimum of a convex functional subject to the equations. A main contribution, as compared to previously published approaches to achieving similar aims, is a more than an order of magnitude speed-up, as demonstrated by applying the methods to problems of image reconstruction from projections. In addition, the accelerated algorithms are illustrated to be better, in a strict sense provided by the method of statistical hypothesis testing, than their unaccelerated versions for the task of detecting small tumors in the brain from X-ray CT projection data. PMID:23440911
Nikazad, T; Davidi, R; Herman, G T
2012-03-01
We study the convergence of a class of accelerated perturbation-resilient block-iterative projection methods for solving systems of linear equations. We prove convergence to a fixed point of an operator even in the presence of summable perturbations of the iterates, irrespective of the consistency of the linear system. For a consistent system, the limit point is a solution of the system. In the inconsistent case, the symmetric version of our method converges to a weighted least squares solution. Perturbation resilience is utilized to approximate the minimum of a convex functional subject to the equations. A main contribution, as compared to previously published approaches to achieving similar aims, is a more than an order of magnitude speed-up, as demonstrated by applying the methods to problems of image reconstruction from projections. In addition, the accelerated algorithms are illustrated to be better, in a strict sense provided by the method of statistical hypothesis testing, than their unaccelerated versions for the task of detecting small tumors in the brain from X-ray CT projection data.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bryan, Frank; Dennis, John; MacCready, Parker
This project aimed to improve long term global climate simulations by resolving and enhancing the representation of the processes involved in the cycling of freshwater through estuaries and coastal regions. This was a collaborative multi-institution project consisting of physical oceanographers, climate model developers, and computational scientists. It specifically targeted the DOE objectives of advancing simulation and predictive capability of climate models through improvements in resolution and physical process representation.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bryan, Frank; Dennis, John; MacCready, Parker
This project aimed to improve long term global climate simulations by resolving and enhancing the representation of the processes involved in the cycling of freshwater through estuaries and coastal regions. This was a collaborative multi-institution project consisting of physical oceanographers, climate model developers, and computational scientists. It specifically targeted the DOE objectives of advancing simulation and predictive capability of climate models through improvements in resolution and physical process representation.
Renewable Energy in China: Xiao Qing Dao Village Power Wind/Diesel Hybrid Pilot Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
2006-01-01
In 2000, DOE/NREL and the State Power Corporation of China (SPCC) developed a pilot project to electrify Xiao Qing Dao, a small island located in China's Yellow Sea. The project demonstrates the practicality of renewable energy systems for medium-scale, off-grid applications. It consists of four 10 k-W wind turbines connected to a 30-kW diesel generator, a 40-kW inverter and a battery bank.
Engineering of head-mounted projective displays.
Hua, H; Girardot, A; Gao, C; Rolland, J P
2000-08-01
Head-mounted projective displays (HMPD's) are a novel type of head-mounted display. A HMPD consists of a miniature projection lens mounted upon the user's head and retroreflective sheeting material placed strategically in the environment. First, the imaging concept of a HMPD is reviewed and its potential advantages and disadvantages are discussed. The design and a bench prototype implementation are then presented. Finally, the effects of retroreflective materials on the imaging properties and the optical properties of HMPD's are comprehensively investigated.
BAO Plate Archive Project: Digitization, Electronic Database and Research Programmes
NASA Astrophysics Data System (ADS)
Mickaelian, A. M.; Abrahamyan, H. V.; Andreasyan, H. R.; Azatyan, N. M.; Farmanyan, S. V.; Gigoyan, K. S.; Gyulzadyan, M. V.; Khachatryan, K. G.; Knyazyan, A. V.; Kostandyan, G. R.; Mikayelyan, G. A.; Nikoghosyan, E. H.; Paronyan, G. M.; Vardanyan, A. V.
2016-06-01
The most important part of the astronomical observational heritage are astronomical plate archives created on the basis of numerous observations at many observatories. Byurakan Astrophysical Observatory (BAO) plate archive consists of 37,000 photographic plates and films, obtained at 2.6m telescope, 1m and 0.5m Schmidt type and other smaller telescopes during 1947-1991. In 2002-2005, the famous Markarian Survey (also called First Byurakan Survey, FBS) 1874 plates were digitized and the Digitized FBS (DFBS) was created. New science projects have been conducted based on these low-dispersion spectroscopic material. A large project on the whole BAO Plate Archive digitization, creation of electronic database and its scientific usage was started in 2015. A Science Program Board is created to evaluate the observing material, to investigate new possibilities and to propose new projects based on the combined usage of these observations together with other world databases. The Executing Team consists of 11 astronomers and 2 computer scientists and will use 2 EPSON Perfection V750 Pro scanners for the digitization, as well as Armenian Virtual Observatory (ArVO) database will be used to accommodate all new data. The project will run during 3 years in 2015-2017 and the final result will be an electronic database and online interactive sky map to be used for further research projects, mainly including high proper motion stars, variable objects and Solar System bodies.
A Harder Rain is Going to Fall: Challenges for Actionable Projections of Extremes
NASA Astrophysics Data System (ADS)
Collins, W.
2014-12-01
Hydrometeorological extremes are projected to increase in both severity and frequency as the Earth's surface continues to warm in response to anthropogenic emissions of greenhouse gases. These extremes will directly affect the availability and reliability of water and other critical resources. The most comprehensive suite of multi-model projections has been assembled under the Coupled Model Intercomparison Project version 5 (CMIP5) and assessed in the Fifth Assessment (AR5) of the Intergovernmental Panel on Climate Change (IPCC). In order for these projections to be actionable, the projections should exhibit consistency and fidelity down to the local length and timescales required for operational resource planning, for example the scales relevant for water allocations from a major watershed. In this presentation, we summarize the length and timescales relevant for resource planning and then use downscaled versions of the IPCC simulations over the contiguous United States to address three questions. First, over what range of scales is there quantitative agreement between the simulated historical extremes and in situ measurements? Second, does this range of scales in the historical and future simulations overlap with the scales relevant for resource management and adaptation? Third, does downscaling enhance the degree of multi-model consistency at scales smaller than the typical global model resolution? We conclude by using these results to highlight requirements for further model development to make the next generation of models more useful for planning purposes.
Topics in computational physics
NASA Astrophysics Data System (ADS)
Monville, Maura Edelweiss
Computational Physics spans a broad range of applied fields extending beyond the border of traditional physics tracks. Demonstrated flexibility and capability to switch to a new project, and pick up the basics of the new field quickly, are among the essential requirements for a computational physicist. In line with the above mentioned prerequisites, my thesis described the development and results of two computational projects belonging to two different applied science areas. The first project is a Materials Science application. It is a prescription for an innovative nano-fabrication technique that is built out of two other known techniques. The preliminary results of the simulation of this novel nano-patterning fabrication method show an average improvement, roughly equal to 18%, with respect to the single techniques it draws on. The second project is a Homeland Security application aimed at preventing smuggling of nuclear material at ports of entry. It is concerned with a simulation of an active material interrogation system based on the analysis of induced photo-nuclear reactions. This project consists of a preliminary evaluation of the photo-fission implementation in the more robust radiation transport Monte Carlo codes, followed by the customization and extension of MCNPX, a Monte Carlo code developed in Los Alamos National Laboratory, and MCNP-PoliMi. The final stage of the project consists of testing the interrogation system against some real world scenarios, for the purpose of determining the system's reliability, material discrimination power, and limitations.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rakowski, Cynthia L.; Serkowski, John A.; Richmond, Marshall C.
2010-12-01
Although fisheries biology studies are frequently performed at US Army Corps of Engineers (USACE) projects along the Columbia and Snake Rivers, there is currently no consistent definition of the ``forebay'' and ``tailrace'' regions for these studies. At this time, each study may use somewhat arbitrary lines (e.g., the Boat Restriction Zone) to define the upstream and downstream limits of the study, which may be significantly different at each project. Fisheries researchers are interested in establishing a consistent definition of project forebay and tailrace regions for the hydroelectric projects on the lower Columbia and Snake rivers. The Hydraulic Extent of amore » project was defined by USACE (Brad Eppard, USACE-CENWP) as follows: The river reach directly upstream (forebay) and downstream (tailrace) of a project that is influenced by the normal range of dam operations. Outside this reach, for a particular river discharge, changes in dam operations cannot be detected by hydraulic measurement. The purpose of this study was to, in consultation with USACE and regional representatives, develop and apply a consistent set of criteria for determining the hydraulic extent of each of the projects in the lower Columbia and Snake rivers. A 2D depth-averaged river model, MASS2, was applied to the Snake and Columbia Rivers. New computational meshes were developed most reaches and the underlying bathymetric data updated to the most current survey data. The computational meshes resolved each spillway bay and turbine unit at each project and extended from project to project. MASS2 was run for a range of total river flows and each flow for a range of project operations at each project. The modeled flow was analyzed to determine the range of velocity magnitude differences and the range of flow direction differences at each location in the computational mesh for each total river flow. Maps of the differences in flow direction and velocity magnitude were created. USACE fishery biologists requested data analysis to determine the project hydraulic extent based on the following criteria: 1) For areas where the mean velocities are less than 4 ft/s, the water velocity differences between operations are not greater than 0.5 ft/sec and /or the differences in water flow direction are not greater than 10 degrees, 2) If mean water velocity is 4.0 ft/second or greater the boundary is determined using the differences in water flow direction (i.e., not greater than 10 degrees). Based on these criteria, and excluding areas with a mean velocity of less than 0.1 ft/s (within the error of the model), a final set of graphics were developed that included data from all flows and all operations. Although each hydroelectric project has a different physical setting, there were some common results. The downstream hydraulic extent tended to be greater than the hydraulic extent in the forebay. The hydraulic extent of the projects tended to be larger at the mid-range flows. At higher flows, the channel geometry tends to reduce the impact of project operations.« less
ERIC Educational Resources Information Center
O'Connor, Thomas G.; Caspi, Avshalom; DeFries, John C.; Plomin, Robert
2000-01-01
Data from Colorado Adoption Project were used to examine hypothesis that association between parental divorce and children's adjustment is mediated by genetic factors. Findings for psychopathology were consistent with an environmentally mediated explanation for the association. Findings for achievement and social adjustment were consistent with a…
ERIC Educational Resources Information Center
Goldenhersh, Barbara, Ed.
This document consists of three issues of the journal "Seedbed," an outcome of the Teachers' Center Project at Southern Illinois University at Edwardsville (SIUE). Issue Number 29 contains 67 articles on teachers' ideas that they thought worth sharing with other teachers. Issue Number 30 consists of a single paper, "Children and…
12 CFR 390.265 - Real estate lending standards.
Code of Federal Regulations, 2014 CFR
2014-01-01
... consistent with safe and sound banking practices; (ii) Be appropriate to the size of the institution and the... institution's policies must be comprehensive, and consistent with safe and sound lending practices, and must..., construction, and absorption rates. • Current and projected lease terms, rental rates, and sales prices...
12 CFR 390.265 - Real estate lending standards.
Code of Federal Regulations, 2013 CFR
2013-01-01
... consistent with safe and sound banking practices; (ii) Be appropriate to the size of the institution and the... institution's policies must be comprehensive, and consistent with safe and sound lending practices, and must..., construction, and absorption rates. • Current and projected lease terms, rental rates, and sales prices...
12 CFR 160.101 - Real estate lending standards.
Code of Federal Regulations, 2013 CFR
2013-01-01
... consistent with safe and sound banking practices; (ii) Be appropriate to the size of the institution and the... institution's policies must be comprehensive, and consistent with safe and sound lending practices, and must..., construction, and absorption rates. • Current and projected lease terms, rental rates, and sales prices...
12 CFR 160.101 - Real estate lending standards.
Code of Federal Regulations, 2014 CFR
2014-01-01
... consistent with safe and sound banking practices; (ii) Be appropriate to the size of the institution and the... institution's policies must be comprehensive, and consistent with safe and sound lending practices, and must..., construction, and absorption rates. • Current and projected lease terms, rental rates, and sales prices...
1989-10-01
rabbits, P to flat planchettes , F to metallic foils, and B to scintillation bottles. The 18Ta sample consisted of a dusting of oxide on a thin aluminum...slower class consisted either of thin metallic disks or metallic chips or chemical compounds contained within flat polyethylene planchettes . 16 N00014-86
Climate change and observed climate trends in the fort cobb experimental watershed.
Garbrecht, J D; Zhang, X C; Steiner, J L
2014-07-01
Recurring droughts in the Southern Great Plains of the United States are stressing the landscape, increasing uncertainty and risk in agricultural production, and impeding optimal agronomic management of crop, pasture, and grazing systems. The distinct possibility that the severity of recent droughts may be related to a greenhouse-gas induced climate change introduces new challenges for water resources managers because the intensification of droughts could represent a permanent feature of the future climate. Climate records of the Fort Cobb watershed in central Oklahoma were analyzed to determine if recent decade-long trends in precipitation and air temperature were consistent with climate change projections for central Oklahoma. The historical precipitation record did not reveal any compelling evidence that the recent 20-yr-long decline in precipitation was related to climate change. Also, precipitation projections by global circulation models (GCMs) displayed a flat pattern through the end of the 21st century. Neither observed nor projected precipitation displayed a multidecadal monotonic rising or declining trend consistent with an ongoing warming climate. The recent trend in observed annual precipitation was probably a decade-scale variation not directly related to the warming climate. On the other hand, the observed monotonic warming trend of 0.34°C decade that started around 1978 is consistent with GCM projections of increasing temperature for central Oklahoma. Copyright © by the American Society of Agronomy, Crop Science Society of America, and Soil Science Society of America, Inc.
Progress in superconductivity: The Indian Scenario
NASA Technical Reports Server (NTRS)
Multani, Manu; Mishra, V. K.
1995-01-01
India has made rapid progress in the field of high temperature superconductivity, beginning at the time of publication of the Zeitschrift fur Physik paper by Bednorz and Muller. Phase 1 of the program was conceived by the Department of Science & Technology of the Government of India. It consisted of 42 projects in the area of basic research, 23 projects in applications and 4 short-term demonstration studies. The second phase started in October 1991 and will run through March 1995. It consists of 50 basic research programs and 24 application programs. The total investment, mainly consisting of infrastructural development to supplement existing facilities and hiring younger people, has amounted to about Indian Rupees 40 crores, equivalent to about US$ 13 million. The expenditure for the period 1992-1997 shall be up to about Rs. 27 crores, equivalent to about US$ 9 million. The basic idea is to keep pace with developments around the world.
Locked on course: Hydro-Quebec`s commitment to mega-projects
DOE Office of Scientific and Technical Information (OSTI.GOV)
Maxwell, J.; Briscoe, F.; Suzuki, Tatsujiro
1997-01-01
Large organizations often escalate their commitments to mega-project development, even after evidence becomes available of adverse environmental consequences or lack of economic feasibility. This escalation of commitment transcends both sectorial and national boundaries. Preeminent examples include controversial nuclear projects in the US, hydroelectric projects like the Three Gorges Dam in China, and transport projects like the Chunnel and the Concorde. In this article, the authors examine the experience of Hydro-Quebec with the Great Whale Project. They argue that Hydro-Quebec escalated its commitment even after serious questions emerged about its environmental impacts and economic feasibility, because of (1) its earlier successmore » with large projects, (2) its engineering culture`s norms for consistency, and (3) its role in the government`s desire for economic and cultural autonomy. Finally, they discuss the changes that are necessary to break commitments to such projects.« less
Research on Bidding Decision-making of International Public-Private Partnership Projects
NASA Astrophysics Data System (ADS)
Hu, Zhen Yu; Zhang, Shui Bo; Liu, Xin Yan
2018-06-01
In order to select the optimal quasi-bidding project for an investment enterprise, a bidding decision-making model for international PPP projects was established in this paper. Firstly, the literature frequency statistics method was adopted to screen out the bidding decision-making indexes, and accordingly the bidding decision-making index system for international PPP projects was constructed. Then, the group decision-making characteristic root method, the entropy weight method, and the optimization model based on least square method were used to set the decision-making index weights. The optimal quasi-bidding project was thus determined by calculating the consistent effect measure of each decision-making index value and the comprehensive effect measure of each quasi-bidding project. Finally, the bidding decision-making model for international PPP projects was further illustrated by a hypothetical case. This model can effectively serve as a theoretical foundation and technical support for the bidding decision-making of international PPP projects.
Lech, Przemysław
2016-01-01
The purpose of this research was to investigate the causes of the dominant risk factors, affecting Enterprise System implementation projects and propose remedies for those risk factors from the perspective of implementation consultants. The study used a qualitative research strategy, based on e-mail interviews, semi-structured personal interviews with consultants and participant observation during implementation projects. The main contribution of this paper is that it offers viable indications of how to mitigate the dominant risk factors. These indications were grouped into the following categories: stable project scope, smooth communication supported by the project management, dedicated, competent and decision-making client team, competent and engaged consultant project manager, schedule and budget consistent with the project scope, use of methodology and procedures, enforced and enabled by the project managers, competent and dedicated consultants. A detailed description is provided for each category.
Divergent surface and total soil moisture projections under global warming
Berg, Alexis; Sheffield, Justin; Milly, Paul C.D.
2017-01-01
Land aridity has been projected to increase with global warming. Such projections are mostly based on off-line aridity and drought metrics applied to climate model outputs but also are supported by climate-model projections of decreased surface soil moisture. Here we comprehensively analyze soil moisture projections from the Coupled Model Intercomparison Project phase 5, including surface, total, and layer-by-layer soil moisture. We identify a robust vertical gradient of projected mean soil moisture changes, with more negative changes near the surface. Some regions of the northern middle to high latitudes exhibit negative annual surface changes but positive total changes. We interpret this behavior in the context of seasonal changes in the surface water budget. This vertical pattern implies that the extensive drying predicted by off-line drought metrics, while consistent with the projected decline in surface soil moisture, will tend to overestimate (negatively) changes in total soil water availability.
Projects in an expert system class
NASA Technical Reports Server (NTRS)
Whitson, George M.
1991-01-01
Many universities now teach courses in expert systems. In these courses students study the architecture of an expert system, knowledge acquisition techniques, methods of implementing systems and verification and validation techniques. A major component of any such course is a class project consisting of the design and implementation of an expert system. Discussed here are a number of techniques that we have used at the University of Texas at Tyler to develop meaningful projects that could be completed in a semester course.
[Healthy Cities projects in Europe].
Nakamura, Keiko
2002-05-01
The WHO Healthy Cities Project has been developed in Europe to place health high on the agenda of city decision-makers. It has promoted comprehensive local strategies for health and sustainable development. Cities endorse principles and strategies, establish project infrastructures, work on specific goals, products, changes, and outcomes, and invest in formal and informal networking and cooperation. Consistent research and development efforts are contributing towards a more evidence-based policy making and to the emergence of a framework to meet the demands of the new public health movement.
How To Improve Work In Planetarium?
NASA Astrophysics Data System (ADS)
Pavicic, G.
2009-09-01
Planetariums can provide an immersive environment for scientific education, virtual reality, and entertainment (Shaw 1998). Digital projection into domes, called "full dome projection", can be a technically challenging and expensive exercise, particularly for installation with a modest budget. Here we present an alternative full dome digital projection system, which consists of a single projector and a spherical mirror that scatter the light onto the dome surface. This approach offers many advantages over the fisheye lens alternatives, and results in a similar quality for just a fraction of costs.
1988-09-01
committee consisting of the Under Secre- tary of the Air Force, Joseph Charyk; the Deputy Director of Defense Research and Engineering , John H. Rubel...prepared as part of RAND-sponsored research, was originally intended to commemorate the fortieth anniversary of Project RAND (now Project AIR FORCE), a...simple matter either for the authors or for the U.S. government.(/-) Hence, a project begun two years ago to commemorate the fortieth anniversary of Air
1980-05-02
642 .. . . . OBJECTIVES S PROJECT In April 1978, a Mission Assurance Conference was sponsored jointly by the Air Force Space...equipment or services from a corporation. 4 The corporation in turn probably consists controls manager, and project engineers? of thousands of people and a...once the project effective? Were we motivating them by is assigned, it is run in the military rewarding them in some manner for good department by a
DOE Office of Scientific and Technical Information (OSTI.GOV)
Aptekar, Alexander
The final report on New York City College of Technology (City Tech) DURA (Diverse | Urban | Resilient | Adaptable) home project. City Tech has participated in the Solar Decathlon 2015 project as DURA. The DURA team consists of students, faculty, volunteers, Service Corps participants, Industry advisers, recent graduates and others. The DURA team researched, designed, and constructed a zero energy prototype house. This process was a valuable opportunity for City Tech as a project of such scale has not been completed before with the integration of so many departments and their students.
ERIC Educational Resources Information Center
Oklahoma State Univ., Stillwater.
The first stage of this research project consisted of (1) an in-plant study of electro-mechanical technician operations to determine what skills and knowledge combinations are required, (2) in-depth interviews with administrative and supervisory personnel in 26 selected industrial organizations geographically distributed from New England to…
ERIC Educational Resources Information Center
Suh, Jennifer; Seshaiyer, Padmanabhan
2015-01-01
This study examines elementary- and middle-grade teachers' understanding of the mathematical learning progression as they participated in a 6-month professional learning project. Teachers participated in a professional development project that consisted of a 1-week summer content-focused institute with school-based follow-up Lesson Study cycles in…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-03
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14330-000] ORPC Maine, LLC... feasibility of the Treat Island Tidal Energy Project to be located in Passamaquoddy Bay, between the Town of... would consist of: (1) 15 TidGen\\TM\\ hydrokinetic tidal devices each measuring 98 feet long, 17 feet high...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-15
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13828-000] FFP Mass 1, LLC... study the feasibility of the Cape Cod Tidal Energy Project to be located in the Cape Cod Canal and a...,000 hydrokinetic tidal devices consisting of a turbine blade assembly and an integrated 10-kilowatt...
Project SAVE: Skills, Attitudes, Values, Essential for Employment. Final Report, 1982-83.
ERIC Educational Resources Information Center
Chenard, Marcelle
The Skills, Attitudes, and Values for Employment (SAVE) project was designed to explore the needs of women in the workplace. An exploratory design was selected for the study with a target population consisting of 200 women working in companies in Morris County, New Jersey. From a self-administered questionnaire used to elicit information, the…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-29
... Proposed Project CIG proposes to construct and operate a new air blending station in Douglas County... Spruce Hill Air Blending Project would consist of the following: An air blending compressor station (the Spruce Hill Air Blending Station) containing a 215-, a 390-, and a 500-horsepower air compressor; A back...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-30
... Proposed Project CIG proposes to construct and operate a new air blending station in Douglas County... Spruce Hill Air Blending Project would consist of the following: An air blending compressor station (the Spruce Hill Air Blending Station) containing a 215-, a 390-, and a 500-horsepower air compressor; A back...
A new algorithm for stand table projection models.
Quang V. Cao; V. Clark Baldwin
1999-01-01
The constrained least squares method is proposed as an algorithm for projecting stand tables through time. This method consists of three steps: (1) predict survival in each diameter class, (2) predict diameter growth, and (3) use the least squares approach to adjust the stand table to satisfy the constraints of future survival, average diameter, and stand basal area....
Directory of research projects: Planetary geology and geophysics program
NASA Technical Reports Server (NTRS)
Holt, Henry (Editor)
1992-01-01
Information about currently funded scientific research within the Planetary Geology and Geophysics Program is provided. The directory consists of the proposal summary sheet from each proposal funded under the program during Fiscal Year 1992. The sheets provide information about the research project, including title, principal investigator, institution, summary of research objectives, past accomplishments, and proposed new investigations.
DOT National Transportation Integrated Search
2013-01-01
This project consisted of the development of a revision of the SAE J2735 Dedicated Short Range Communications (DSRC) Message Set Dictionary, published 2009-11-19. This revision will be submitted, at the end of this project to the Society of Automotiv...
Longitudinal Results of the Ypsilanti Perry Preschool Project. Final Report. Volume II of 2 Volumes.
ERIC Educational Resources Information Center
Weikart, David P.; And Others
The Ypsilanti Perry Preschool Project was an experiment to assess the longitudinal effects of a 2-year preschool program designed to compensate for functional mental retardation found in some children from disadvantaged families. The program consisted of a daily cognitively oriented preschool program and home visits each week to involve mothers in…
NREL: U.S. Life Cycle Inventory Database - About the LCI Database Project
About the LCI Database Project The U.S. Life Cycle Inventory (LCI) Database is a publicly available data collection and analysis methods. Finding consistent and transparent LCI data for life cycle and maintain the database. The 2009 U.S. Life Cycle Inventory (LCI) Data Stakeholder meeting was an
Concentrating Solar Power Projects - ISCC Hassi R'mel | Concentrating Solar
solar power (CSP) project, with data organized by background, participants, and power plant consists of a 150 MWe hybrid power plant composed of a combined cycle and a 20 MWe solar thermal plant : Abener Operator(s): Abener Generation Offtaker(s): Sonatrach Plant Configuration Solar Field Solar-Field
ERIC Educational Resources Information Center
Middlesex County Vocational and Technical High Schools, New Brunswick, NJ.
A project helped handicapped high school students to develop and implement realistic vocational plans and to develop functional skills in various areas associated with independent living. Designed as an evening course open to full time special needs vocational high school students, the program consisted of the following two components: (l) a…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-21
... (Snohomish PUD) filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Deception Pass Tidal Energy Project (project). The... consist of the following: (1) Four approximately 66-foot-diameter, 1.6-megawatt horizontal axis tidal...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-25
... application for a successive preliminary permit, pursuant to section 4(f) of the Federal Power Act (FPA), proposing to study the feasibility of the Homeowner Tidal Power Electric Generation Project to be located in.... The proposed project would consist of: (1) 10 hydrokinetic turbine units with an estimated total...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-03
... Services, LLC filed an application, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Fisher's Island Tidal Energy Project, which would be located on the Long Island...' express permission. The proposed project would consist of: (1) Installation of 50 NC Sea Dragon tidal...
An Analysis of Laboratory Activities in Two Modern Science Curricula: Project Physics and PSSC.
ERIC Educational Resources Information Center
Lunetta, Vincent N.; Tamir, Pinchas
In evaluating whether the laboratory guides for Project Physics and for PSSC are consistent with the goals of their designers in demonstrating the interplay between experiment and theory in the development of physics, a system was developed for analyzing physics laboratory investigations, and the laboratory activities in the "PSSC Physics…
Small Business Policy for California. Report of the Urban Small Business Employment Project.
ERIC Educational Resources Information Center
California State Dept. of Human Resources Development, Sacramento.
This report contains findings and recommendations of a project to identify problems in California's policies and in the administration of its laws regarding small businesses and to examine alternative solutions to those problems. Part 1 consists of the findings of five statewide Task Forces that concentrated on these aspects of operating a small…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-22
... installation of about nine million photovoltaic (PV) solar modules within approximately 437 arrays and... final project design. The proposed Project would consist of: A solar field of ground-mounted PV modules... Federal Loan Guarantee To Support Construction of the Topaz Solar Farm, San Luis Obispo County, CA AGENCY...
An (Co)Autoethnography Story about Going against the Neoliberal Didactic Machine
ERIC Educational Resources Information Center
Szwabowski, Oskar; Wezniejewska, Paulina
2017-01-01
The article is an (co)autoethnography story about a project that conducted as a teacher at the University of Szczecin in Poland. Technically, the project consisted in creating a (co)autoethnography text. The story in this article attempts to raise the question of the relationship between (co)autoethography, emancipation and resistance to the…
Alcohol Abuse Prevention: A Comprehensive Guide for Youth Organizations.
ERIC Educational Resources Information Center
Boys' Clubs of America, New York, NY.
This guide, the culmination of a three year Project TEAM effort by the Boys' Clubs of America, describes numerous strategies for developing an alcohol abuse prevention program. The core of this guide consists of program models developed by the Boys' Club project at seven pilot sites. The models presented cover the following areas: peer leadership,…
ERIC Educational Resources Information Center
Oinonen, Charlotte M.
These proceedings consist of the texts of papers and panel discussions presented at a Parker Project-sponsored futures symposium on youth, work, economic productivity, and the challenges facing Wisconsin's secondary schools in providing job training for the future. Addressed in the individual presentations included in this volume are the…