Sample records for umtra project office

  1. Evaluation of impacts and mitigation assessments for the UMTRA Project: Gunnison and Durango pilot studies. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beranich, S.J.

    1994-08-24

    This report evaluates the impacts assessment and proposed mitigations provided in environmental documents concerning the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The projected impacts and proposed mitigations identified in UMTRA Project environmental documents were evaluated for two UMTRA Project sites. These sites are Gunnison and Durango, which are representative of currently active and inactive UMTRA Project sites, respectively. National Environmental Policy Act (NEPA) documentation was prepared for the remedial action at Durango and Gunnison as well as for the provision of an alternate water supply system at Gunnison. Additionally, environmental analysis was completed formore » mill site demolition Gunnison, and for a new road related to the Durango remedial action. The results in this report pertain only to the impact assessments prepared by the Regulatory Compliance staff as a part of the NEPA compliance requirements. Similarly, the mitigative measures documented are those that were identified during the NEPA process.« less

  2. UMTRA project list of reportable occurrences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-04-01

    This UMTRA Project List of Reportable occurrences is provided to facilitate efficient categorization of reportable occurrences. These guidelines have been established in compliance with DOE minimum reporting requirements under DOE Order 5000.3B. Occurrences are arranged into nine groups relating to US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project operations for active sites. These nine groupings are provided for reference to determined whether an occurrence meets reporting requirement criteria in accordance with the minimum reporting requirements. Event groups and significance categories that cannot or will not occur, and that do not apply to UMTRA Project operations, aremore » omitted. Occurrence categorization shall be as follows: Group 1. Facility Condition; Group 2. Environmental; Group 3. Personnel Safety; Group 4. Personnel Radiation Protection; Group 5. Safeguards and Security; Group 6. Transportation; Group 7. Value Basis Reporting; Group 8. Facility Status; and Group 9. Cross-Category Items.« less

  3. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less

  4. Environmental Assessment of Ground Water Compliance at the Durango, Colorado, UMTRA Project Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    2002-11-29

    The U.S. Department of Energy (DOE) is proposing a ground water compliance strategy for the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Durango, Colorado. DOE has prepared this environmental assessment to provide the public with information concerning the potential effects of this proposed strategy.

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Metzler, D.; Gibb, J.P.; Glover, W.A.

    Compliance with the mandate of the Uranium Mill Tailings Radiation Control Act (UMTRCA) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites requires implementation of a groundwater remedial action plan that meets the requirements of Subpart B of the US Environmental Protection Agency`s proposed groundwater protection standards (40 CFR 192). The UMTRA Groundwater Project will ensure that unacceptable current risk or potential risk to the public health, safety and the environment resulting from the groundwater contamination attributable to the UMTRA sites, is mitigated in a timely and cost-efficient manner. For each UMTRA processing site and vicinity property where contamination exists,more » a groundwater remedial action plan must be developed that identifies hazardous constituents and establishes acceptable concentration limits for the hazardous constituents as either (a) alternate concentration limits (ACL), (b) maximum concentration limits (MCLs), (c) supplemental standards, or (d) background groundwater quality levels. Project optimization is a strategy that will aggressively work within the current regulatory framework using all available options to meet regulatory requirements. This strategy is outlined within.« less

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tyrrell, Evan; Denny, Angelita

    Fifty-two groundwater samples and one surface water sample were collected at the Monument Valley, Arizona, Processing Site to monitor groundwater contaminants for evaluating the effectiveness of the proposed compliance strategy as specified in the 1999 Final Site Observational Work Plan for the UMTRA Project Site at Monument Valley, Arizona. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and-analysis-plan-us-department- energy-office-legacy-management-sites). Samples were collected for metals, anions, nitrate + nitrite as N, and ammonia as N analyses at all locations.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the applicationmore » of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents.« less

  8. Department of Energy PEIS scoping session

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Badar, L

    1992-12-10

    This is the second programmatic environmental impact statement scoping session held in Durango, Colorado. The purpose was: to present the ground water program so as to build some familiarity and understanding about the issue involved; and to get Durango community's input. Scoping is the collection of information and getting everyone involved and really making a team out of coming up with a proposed action. This report contains the presentations made by the project manager for the Uranium Mill Tailings (UMTRA) program, site manager for the Durango UMTRA site, manager of ground water hydrology, and include comments made by local residents.

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wood, D.E.

    This report presents discussions given at a conference on environmental remediation, September 8--11, Pasco, Washington. Topics include: public confidence; education; in-situ remediation; Hanford tank operations; risk assessments; field experiences; standards; site characterization and monitoring; technology discussions; regulatory issues; compliance; and the UMTRA project. Individual projects are processed separately for the data bases.

  10. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agencymore » (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.« less

  11. Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-03-01

    This long-term surveillance plan (LTSP) for the Durango, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Durango (Bodo Canyon) disposal site, which will be referred to as the disposal site throughout this document. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal site continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). RRMs include tailings and other uranium ore processing wastesmore » still at the site, which the DOE determines to be radioactive. This LTSP is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992).« less

  12. Wildlife mitigation and monitoring report Gunnison, Colorado, site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is administered by the U.S. Department of Energy (DOE); its purpose is to cleanup uranium mill tailings and other contaminated material at 24 UMTRA Project sites in 10 states. This report summarizes the wildlife mitigation and monitoring program under way at the Gunnison UMTRA Project, Gunnison, Colorado. Remedial action at the Gunnison site was completed in December 1995 and is described in detail in the Gunnison completion report. The impacts of this activity were analyzed in the Gunnison environmental assessment (EA). These impacts included two important game species: the pronghorn antelope (Antilocapramore » americans) and sage grouse (Wentrocerus urophasianus). Haul truck traffic was predicted to limit antelope access to water sources north of the Tenderfoot Mountain haul road and that truck traffic along this and other haul roads could result in antelope road kills. Clearing land at the disposal cell, haul road and borrow site activities, and the associated human activities also were predicted to negatively impact (directly and indirectly) sage grouse breeding, nesting, loafing, and wintering habitat. As a result, an extensive mitigation and monitoring plan began in 1992. Most of the monitoring studies are complete and the results of these studies, written by different authors, appear in numerous reports. This report will: (1) Analyze existing impacts and compare them to predicted impacts. (2) Summarize mitigation measures. (3) Summarize all existing monitoring data in one report. (4) Analyze the effectiveness of the mitigation measures.« less

  13. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    For the UMTRA Project site located near Durango, Colorado (the Durango site), the Surface Project cleanup occurred from 1986 to 1991. An evaluation was made to determine whether exposure to ground water contaminated by uranium processing could affect people`s health. Exposure could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. In addition, environmental risks may result if plants or animals are exposed to contaminated ground water, or surface water that has mixed with contaminated ground water. This risk assessment report is the first site-specific document prepared for the UMTRA Ground Water Projectmore » at the Durango site. The results of this report and further site characterization of the Durango site will be used to determine what is necessary to protect public health and the environment, and to comply with the EPA standards.« less

  14. Long-term surveillance plan for the Green River, Utah, disposal site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-06-01

    The long-term surveillance plan (LTSP) for the Green River, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Green River disposal cell. The U.S. Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This final LTSP was prepared as a requirement for acceptance under the U.S. Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). This LTSP documents whether the land and interests are owned by the United States or an Indian tribe and detailsmore » how the long-term care of the disposal site will be carried out. The Green River, Utah, LTSP is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a).« less

  15. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less

  16. Buffer zone monitoring plan for the Dos Rios subdivision, Gunnison, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    This report presents a plan for water quality monitoring at the Dos Rios subdivision (Units 2, 3, and the Island Unit) that is intended to satisfy the informational needs of residents who live southwest (downgradient) of the former Gunnison processing site. Water quality monitoring activities described in this report are designed to protect the public from residual contamination that entered the ground water as a result of previous uranium milling operations. Requirements presented in this monitoring plan are also included in the water sampling and analysis plan (WSAP) for the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project site. Themore » Gunnison WSAP is a site-specific document prepared by the U.S. Department of Energy (DOE) that provides background, guidance, and justification for future ground water sampling and analysis activities for the UMTRA Project Gunnison processing and disposal sites. The WSAP will be updated annually, as additional water quality data are collected and interpreted, to provide ongoing protection for public health and the environment.« less

  17. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  18. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1995-02-01

    This risk assessment evaluates the possibility of health and environmental risks from contaminated ground water at the uranium mill tailings site near Durango, Colorado. The former uranium processing site`s contaminated soil and material were removed and placed at a disposal site located in Body Canyon, Colorado, during 1986--1991 by the US Departments of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating the nature and extent of ground water contamination at the site. This risk assessment follows an approach similar to that used by the US Environmental Protection Agency. The first step is to determinemore » what site-related contaminants are found in ground water samples. The next step in the risk assessment is to determine how much of these contaminants people might ingest if they got their drinking water from a well on the site. In accordance with standard practice for this type of risk assessment, the highest contaminant concentrations from the most contaminated wells are used. The risk assessment then explains the possible health problems that could result from this amount of contamination.« less

  19. Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Act on (UMTRA) Project Bodo Canyon disposal site at Durango, Colorado, describes the surveillance activities for the disposal site. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal call continues to function as designed This LTSP was prepared as a requirement for DOE acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM) from processing uranium ore. This LTSP documents that the land and interests are owned by the United States andmore » details how long-term care of the disposal site will be carried out. It is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a). Following the introduction, contents of this report include the following: site final condition; site drawings and photographs; permanent site surveillance features; ground water monitoring; annual site inspections; unscheduled inspections; custodial maintenance; corrective action; record keeping and reporting requirements; emergency notification and reporting; quality assurance; personal health and safety; list of contributions; and references.« less

  20. Technical approach to groundwater restoration. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less

  1. In situ remediation of uranium contaminated groundwater

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dwyer, B.P.; Marozas, D.C.

    1997-02-01

    In an effort to develop cost-efficient techniques for remediating uranium contaminated groundwater at DOE Uranium Mill Tailing Remedial Action (UMTRA) sites nationwide, Sandia National Laboratories (SNL) deployed a pilot scale research project at an UMTRA site in Durango, CO. Implementation included design, construction, and subsequent monitoring of an in situ passive reactive barrier to remove Uranium from the tailings pile effluent. A reactive subsurface barrier is produced by emplacing a reactant material (in this experiment various forms of metallic iron) in the flow path of the contaminated groundwater. Conceptually the iron media reduces and/or adsorbs uranium in situ to acceptablemore » regulatory levels. In addition, other metals such as Se, Mo, and As have been removed by the reductive/adsorptive process. The primary objective of the experiment was to eliminate the need for surface treatment of tailing pile effluent. Experimental design, and laboratory and field results are discussed with regard to other potential contaminated groundwater treatment applications.« less

  2. In situ remediation of uranium contaminated groundwater

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dwyer, B.P.; Marozas, D.C.

    1997-12-31

    In an effort to develop cost-efficient techniques for remediating uranium contaminated groundwater at DOE Uranium Mill Tailing Remedial Action (UMTRA) sites nationwide, Sandia National Laboratories (SNL) deployed a pilot scale research project at an UMTRA site in Durango, CO. Implementation included design, construction, and subsequent monitoring of an in situ passive reactive barrier to remove Uranium from the tailings pile effluent. A reactive subsurface barrier is produced by emplacing a reactant material (in this experiment - various forms of metallic iron) in the flow path of the contaminated groundwater. Conceptually the iron media reduces and/or adsorbs uranium in situ tomore » acceptable regulatory levels. In addition, other metals such as Se, Mo, and As have been removed by the reductive/adsorptive process. The primary objective of the experiment was to eliminate the need for surface treatment of tailing pile effluent. Experimental design, and laboratory and field preliminary results are discussed with regard to other potential contaminated groundwater treatment applications.« less

  3. Department of Energy Programmatic Environmental Impact Statement (PEIS) scoping session

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-12-31

    The purpose of this programmatic environmental impact statement (PEIS) scoping meeting was: to present the ground water program so as to build some familiarity and understanding about the issue involved; and to get the Durango community`s input. This report contains the presentations made by the project manager for the uranium mill tailings program, site manager for the Durango UMTRA site, manager of ground water hydrology, and includes comments made by local residents.

  4. Comment and response document for the long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    This report contains the comment and response document for the Draft Long-Term Surveillance Plan of the Bodo Canyon Site in Durango, California. This is a part of the Uranium Mill Tailings Remedial Action (UMTRA) Project. Questions and comments regarding specific sections or statements in the report are described and then a response to each review comment or question is provided.

  5. UMTRA project water sampling and analysis plan, Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-01-01

    Surface remedial action has been completed at the Uranium Mill Tailings Remedial Action Project in Durango, Colorado. Contaminated soil and debris have been removed from the former processing site and placed in the Bodo Canyon disposal cell. Ground water at the former uranium mill/tailings site and raffinate pond area has been contaminated by the former milling operations. The ground water at the disposal site was not impacted by the former milling operations at the time of the cell`s construction. Activities for fiscal 1994 involve ground water sampling and site characterization of the disposal site.

  6. US Department of Energy response to standards for remedial actions at inactive uranium processing sites: Proposed rule

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-01-29

    The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all Title I sites. On September 24, 1987, the EPA published proposed standards (52FR36000-36008) in response to the remand. This report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project,more » as well as a discussion of the DOE's position on the proposed standards. The report also contains and appendix which provides supporting information and cost analyses. In order to assess the impacts of the proposed EPA standards, this report summarizes the proposed EPA standards in Section 2.0. The next three sections assess the impacts of the three parts of the EPA standards: Subpart A considers disposal sites; Subpart B is concerned with restoration at processing sites; and Subpart C addresses supplemental standards. Section 6.0 integrates previous sections into a recommendations section. Section 7.0 contains the DOE response to questions posed by the EPA in the preamble to the proposed standards. 6 refs., 5 figs., 3 tabs.« less

  7. Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-10-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) ofmore » riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period.« less

  8. Format and style for environmental documents prepared as part of the Uranium Mill Tailings Remedial Action Program. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The Uranium Mill Tailings Remedial Action Program will require the preparation of several environmental impact statements and several environmental assessments. This guide begins with a section describing in general terms the efforts required to make these documents readable. The sections describe the formats to be used for the pages, headings, front matter, footnotes, lists, figures, tables, references, glossaries, indexes, and appendixes in these documents. A final section presents some rules of style to be followed in writing the texts.

  9. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonablemore » effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in accordance with the final standards. The EPA reserves the right to modify the ground water standards, if necessary, based on changes in EPA drinking water standards. Appendix A contains a copy of the 1983 EPA ground water compliance standards, the 1987 proposed changes to the standards, and the 1995 final rule. Under UMTRA, DOE is responsible for bringing the designated processing sites into compliance with the EPA ground water standards and complying with all other applicable standards and requirements. The U.S. Nuclear Regulatory Commission (NRC) must concur with DOE's actions. States are full participants in the process. The DOE also must consult with any affected Indian tribes and the Bureau of Indian Affairs. Uranium processing activities at most of the inactive mill sites resulted in the contamination of ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of constituents such as but not limited to uranium and nitrates. The purpose of the UMTRA Ground Water Project is to eliminate or reduce to acceptable levels the potential health and environmental consequences of milling activities by meeting the EPA ground water standards.« less

  10. Data Validation Package June 2016 Groundwater and Surface Water Sampling at the Old and New Rifle, Colorado, Processing Sites September 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    Sampling Period: June 14–17 and July 7, 2016. Water samples were collected from 36 locations at New Rifle and Old Rifle, Colorado, Disposal/Processing Sites. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Duplicate samples were collected from New Rifle locations 0216 and 0855, and Old Rifle location 0655. One equipment blank was collected after decontamination of non-dedicated equipment used to collect one surface water sample. See Attachment 2, Trip Report for additional details. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Managementmore » Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). New Rifle Site Samples were collected at the New Rifle site from 16 monitoring wells and 7 surface locations in compliance with the December 2008 Groundwater Compliance Action Plan [GCAP] for the New Rifle, Colorado, Processing Site (LMS/RFN/S01920). Monitoring well 0216 could not be sampled in June because it was surrounded by standing water due to the high river stage from spring runoff, it was later sampled in July. Monitoring well 0635 and surface location 0322 could not be sampled because access through the elk fence along Interstate 70 has not been completed at this time. Old Rifle Site Samples were collected at the Old Rifle site from eight monitoring wells and five surface locations in compliance with the December 2001 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site (GJ0-2000-177-TAR).« less

  11. Cleanup protocol for 226Ra-contaminated cobbly soil at UMTRA Project sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gonzales, D.E.; Millard, J.B.; Miller, M.L.

    The nonuniform distribution of 226Ra and other radiological contamination of cobbly soil encountered on several Uranium Mill Tailings Remedial Action Project sites is presented and discussed, and the concomitant challenges to the intent and implementation of the U.S. Environmental Protection Agency's soil cleanup standards are noted. In response to technical assessments and information presented to the U.S. Nuclear Regulatory Commission by the U.S. Department of Energy, the Nuclear Regulatory Commission has recently resolved the dilemma by concluding that compliance with Environmental Protection Agency soil cleanup standards for cobby soil at Uranium Mill Tailings Remedial Action Project sites would be adequatelymore » attained using bulk radionuclide concentrations, instead of requiring that the radionuclide concentration of the finer soil fraction passing a No. 4 mesh sieve met the standards. A Nuclear Regulatory Commission-approved procedure developed for cobbly soil remediation is outlined and discussed. The site-specific implementation of this procedure at Uranium Mill Tailings Remedial Action Project sites containing cobbly soil is estimated to save millions of dollars.« less

  12. Final Scientific/Technical Report, DE-FG02-06ER64171, Integrated Nucleic Acid System for In-Field Monitoring of Microbial Community Dynamics and Metabolic Activity – Subproject to Co-PI Eric E. Roden

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eric E. Roden

    2009-07-08

    This report summarizes research conducted in conjunction with a project entitled “Integrated Nucleic Acid System for In-Field Monitoring of Microbial Community Dynamics and Metabolic Activity”, which was funded through the Integrative Studies Element of the former NABIR Program (now the Environmental Remediation Sciences Program) within the Office of Biological and Environmental Research. Dr. Darrell Chandler (originally at Argonne National Laboratory, now with Akonni Biosystems) was the overall PI/PD for the project. The overall project goals were to (1) apply a model iron-reducer and sulfate-reducer microarray and instrumentation systems to sediment and groundwater samples from the Scheibe et al. FRC Areamore » 2 field site, UMTRA sediments, and other DOE contaminated sites; (2) continue development and expansion of a 16S rRNA/rDNA¬-targeted probe suite for microbial community dynamics as new sequences are obtained from DOE-relevant sites; and (3) address the fundamental molecular biology and analytical chemistry associated with the extraction, purification and analysis of functional genes and mRNA in environmental samples. Work on the UW subproject focused on conducting detailed batch and semicontinuous culture reactor experiments with uranium-contaminated FRC Area 2 sediment. The reactor experiments were designed to provide coherent geochemical and microbiological data in support of microarray analyses of microbial communities in Area 2 sediments undergoing biostimulation with ethanol. A total of four major experiments were conducted (one batch and three semicontinuous culture), three of which (the batch and two semicontinuous culture) provided samples for DNA microarray analysis. A variety of other molecular analyses (clone libraries, 16S PhyloChip, RT-PCR, and T-RFLP) were conducted on parallel samples from the various experiments in order to provide independent information on microbial community response to biostimulation.« less

  13. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Dave; Miller, David; Kautsky, Mark

    A uranium- and vanadium-ore-processing mill operated from 1954 to 1968 within the Navajo Nation near Shiprock, New Mexico. By September 1986, all tailings and structures on the former mill property were encapsulated in a disposal cell built on top of two existing tailings piles on the Shiprock site (the site) [1]. Local groundwater was contaminated by multiple inorganic constituents as a result of the milling operations. The U.S. Department of Energy (DOE) took over management of the site in 1978 as part of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The DOE Office of Legacy Management currently manages ongoingmore » activities at the former mill facility, including groundwater remediation. Remediation activities are designed primarily to reduce the concentrations and total plume mass of the mill-related contaminants sulfate, uranium, and nitrate. In addition to contaminating groundwater in alluvial and bedrock sediments directly below the mill site, ore processing led to contamination of a nearby floodplain bordering the San Juan River. Groundwater in a shallow alluvial aquifer beneath the floodplain is strongly influenced by the morphology of the river channel as well as changing flows in the river, which provides drainage for regional runoff from the San Juan Mountains of Colorado. As part of a recent study of the floodplain hydrology, a revised conceptual model was developed for the alluvial aquifer along with an updated status of contaminant plumes that have been impacted by more than 10 years of groundwater pumping for site remediation purposes. Several findings from the recent study will be discussed here.« less

  14. Investigation of background radiation levels and geologic unit profiles in Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Triplett, G.H.; Foutz, W.L.; Lesperance, L.R.

    1989-11-01

    As part of the Uranium Mill Tailings Remedial Action (UMTRA) Project, Oak Ridge National Laboratory (ORNL) has performed radiological surveys on 435 vicinity properties (VPs) in the Durango area. This study was undertaken to establish the background radiation levels and geologic unit profiles in the Durango VP area. During the months of May through June, 1986, extensive radiometric measurements and surface soil samples were collected in the Durango VP area by personnel from ORNL's Grand Junction Office. A majority of the Durango VP surveys were conducted at sites underlain by Quaternary alluvium, older Quaternary gravels, and Cretaceous Lewis and Mancosmore » shales. These four geologic units were selected to be evaluated. The data indicated no formation anomalies and established regional background radiation levels. Durango background radionuclide concentrations in surface soil were determined to be 20.3 {plus minus} 3.4 pCi/g for {sup 40}K, 1.6 {plus minus} 0.5 pCi/g for {sup 226}Ra, and 1.2 {plus minus} 0.3 pCi/g for {sup 232}Th. The Durango background gamma exposure rate was found to be 16.5 {plus minus} 1.3 {mu}R/h. Average gamma spectral count rate measurements for {sup 40}K, {sup 226}Ra and {sup 232}Th were determined to be 553, 150, and 98 counts per minute (cpm), respectively. Geologic unit profiles and Durango background radiation measurements are presented and compared with other areas. 19 refs., 15 figs., 5 tabs.« less

  15. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 4, Water resources protection strategy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards (Subpart A of 40 CFR 192), the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer (Cliff House/Menefee aquifer) at the point of compliance (POC) at the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site in Bodo Canyon near Durango, Colorado (DOE, 1989). Details of hydrologic site characterization at the disposal site are provided in Attachment 3, Groundwater Hydrology Report. The principal features of the water resources protectionmore » strategy for the Bodo Canyon disposal site are presented in this document.« less

  16. Guidance for implementing the long-term surveillance program for UMTRA Project Title I Disposal Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    This guidance document has two purposes: it provides guidance for writing site-specific long-term surveillance plans (LTSP) and it describes site surveillance, monitoring, and long-term care techniques for Title I disposal sites of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.). Long-term care includes monitoring, maintenance, and emergency measures needed to protect public health and safety and the environment after remedial action is completed. This document applies to the UMTRCA-designated Title I disposal sites. The requirements for long-term care of the Title I sites and the contents of the LTSPs are provided in U.S. Nuclearmore » Regulatory Commission (NRC) regulations (10 CFR Section 40.27) provided in Attachment 1.« less

  17. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 4, Water resources protection strategy. Revised final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards (Subpart A of 40 CFR 192), the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer (Cliff House/Menefee aquifer) at the point of compliance (POC) at the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site in Bodo Canyon near Durango, Colorado (DOE, 1989). Details of hydrologic site characterization at the disposal site are provided in Attachment 3, Groundwater Hydrology Report. The principal features of the water resources protectionmore » strategy for the Bodo Canyon disposal site are presented in this document.« less

  18. 1996 monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites was near the town of Gunnison, Colorado. Surface remediation was completed at the Gunnison site in December 1995. Remedial action resulted in the elimination of 4.3 acres of wetlands and mitigation of this loss is through the enhancement of 17.8 acres of riparian plant communities in six spring-fed areas on US Bureau of Land Management mitigation sites. A five-year monitoringmore » program was then implemented to document the response of vegetation and wildlife to the exclusion of livestock. This report provides the results of the third year of the monitoring program.« less

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    The groundwater compliance strategy for the Tuba City, Arizona, Disposal Site is defined in the 1999 Phase I Ground Water Compliance Action Plan for the Tuba City, Arizona, UMTRA Site. Samples are collected and analyzed on a semiannual basis to evaluate the performance of the Phase I remediation system. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). U.S. Environmental Protection Agency (EPA) groundwater standards were exceeded in samples collected from monitoring wells as listed in Table 1. The data from this sampling eventmore » are generally consistent with previously obtained values and are acceptable for general use as qualified. Data anomalies are not significant with respect to the known nature and extent of contamination and progress of remedial action at the site. The data from this sampling event will be incorporated into the annual performance evaluation report that will present a comprehensive hydrologic summary and evaluation of groundwater remedial action performance at the Tuba City site through March 2016.« less

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    The groundwater compliance strategy for the Tuba City, Arizona, Disposal Site is defined in the 1999 Phase I Ground Water Compliance Action Plan for the Tuba City, Arizona, UMTRA Site. Samples are collected and analyzed on a semiannual basis to evaluate the performance of the Phase I remediation system. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). U.S. Environmental Protection Agency (EPA) groundwater standards were exceeded in samples collected from monitoring wells and extraction wells as listed in Table 1. The data frommore » this sampling event are generally consistent with previously obtained values and are acceptable for general use as qualified. Data anomalies are not significant with respect to the known nature and extent of contamination and progress of remedial action at the site. The data from this sampling event will be incorporated into the annual performance evaluation report that will present a comprehensive hydrologic summary and evaluation of groundwater remedial action performance at the Tuba City site through March 2016.« less

  1. Synchrotron X-ray characterization of mackinawite and uraninite relevant to bio-remediation of groundwater contaminated with uranium

    NASA Astrophysics Data System (ADS)

    Carpenter, J.; Hyun, S.; Hayes, K. F.

    2010-12-01

    Uranium (U) originating from mining operations for weapon manufacturing and nuclear energy production is a significant radionuclide contaminant in groundwater local to uranium mining, uranium milling, and uranium mill tailing (UMT) storage sites. In the USA, the Department of Energy (DOE) is currently overseeing approximately 24 Uranium Mill Tailing Remediation Action (UMTRA) sites which have collectively processed over 27 million tons of uranium ore1,2. In-Situ microbial bio-reduction of the highly mobile U6+ ion into the dramatically less mobile U4+ ion has been demonstrated as an effective remedial process to inhibit uranium migration in the aqueous phase3. The resistance of this process to oxidization and possible remobilization of U when bioremediation stops (and oxidants such as oxygen from the air or nitrate in water diffuse into the formation) in the long term is not known. UMTRA site studies3 have shown that iron sulfide solids are produced by sulfate reducing bacteria (SRB) during U bioremediation, and some forms of these iron sulfide solids are known to be effective oxidant scavengers, potentially protecting against re-oxidation and thus remobilization of U. This work is investigating the role of iron sulfide solids in the long-term immobilization of reduced U compounds after bioremediation is completed in groundwater local to UMTRA sites. Re-oxidation tests are being performed in packed media columns loaded with both FeS and U solids. High quality mackinawite (FeS), and uraninite (UO2) have been synthesized in our laboratory via a wet chemistry approach. These synthetic materials are expected to mimic the naturally occurring and biogenic materials present in biologically stimulated UMTRA sites. In order to establish the initial conditions of the prepared experimental columns and to compare synthetic and biogenic FeS and UO2, these synthesized materials have been characterized with synchrotron radiation at the Stanford Synchrotron Radiation Lightsource using synchrotron x-ray powder diffraction (SXRD) and extended x-ray absorption fine structure (EXAFS). SXRD data were collected and analyzed with profile fitting to determine lattice parameters and crystallite size for comparison with published values for both biogenic and synthetic materials. This is particularly of interest for UO2, as there is very little information on particle size and lattice parameters for synthetic UO2 in the literature. Profile fitting of the SXRD data for FeS gives lattice parameters of a = b = 3.668 and a mean crystallite size of 5 to 8 nm. Both of these values are in good agreement with published values. For fresh UO2, lattice parameters were determined as a = b = c = 5.4 nm for both freshly synthesized and aged (3 months) UO2 and particle size was determined to be 3.5 nm for fresh UO2 and 5.83 nm for aged UO2. This suggests a growth mechanism for crystallites over time, and an inferred decrease in reactivity.

  2. MicroBooNE project team recognized by Department of Energy | News

    Science.gov Websites

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  3. Progress Toward Remediation of Uranium Tailings in Mailuu-Suu, Kyrgyzstan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buckley, P B; Ranville, J; Honeyman, B D

    2003-07-09

    The town of Mailuu-Suu in Kyrgyzstan inherited 23 distinct tailings deposits from Soviet-Era uranium mining operations. Mailuu-Suu is located in the narrow landslide-prone valley of the Mailuu-Suu River about 25 km from the Uzbekistan border. Large-scale release of the radioactive tailings, as a result of landslides, could lead to irreversible contamination of the river and downstream areas. The Mailuu-Suu River is a tributary to the Syr-Darya River, the Fergana valley's main source of irrigation water. The Fergana Valley is a key agricultural region and major population center that spans Kyrgyzstan, Tajikistan, and Uzbekistan. The trans-boundary nature of the Mailuu-Suu tailingsmore » issue presents an opportunity for collaboration among these Central Asian states. A cooperative approach to addressing environmental issues such as Mailuu-Suu may contribute to the region's stability by facilitating peaceful associations. Experience from remediation of sites in the US under the Uranium Mill Tailings Remediation Action Project (UMTRA) will be useful in progressing toward remediation at Mailuu-Suu.« less

  4. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... designation of a Program/Project Manager as the Contracting Officer's Technical Representative. 301.607-78... Contracting Officer designation of a Program/Project Manager as the Contracting Officer's Technical... acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  5. 48 CFR 315.305 - Proposal evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... such cases, the Contracting Officer shall request the Project Officer's assistance in analyzing the.... (7) Other direct costs not specified above. (ii) The Project Officer shall provide written comments... Project Officer's comments for negotiations or to support award without discussions. The Contracting...

  6. 48 CFR 315.305 - Proposal evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... such cases, the Contracting Officer shall request the Project Officer's assistance in analyzing the.... (7) Other direct costs not specified above. (ii) The Project Officer shall provide written comments... Project Officer's comments for negotiations or to support award without discussions. The Contracting...

  7. 48 CFR 315.305 - Proposal evaluation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... such cases, the Contracting Officer shall request the Project Officer's assistance in analyzing the.... (7) Other direct costs not specified above. (ii) The Project Officer shall provide written comments... Project Officer's comments for negotiations or to support award without discussions. The Contracting...

  8. Innovation in health service management: Adoption of project management offices to support major health care transformation.

    PubMed

    Lavoie-Tremblay, Mélanie; Aubry, Monique; Cyr, Guylaine; Richer, Marie-Claire; Fortin-Verreault, Jean-François; Fortin, Claude; Marchionni, Caroline

    2017-11-01

    To explore the characteristics that influence project management offices acceptance and adoption in healthcare sector. The creation of project management offices has been suggested as a promising avenue to promote successful organisational change and facilitate evidence-based practice. However, little is known about the characteristics that promote their initial adoption and acceptance in health care sector. This knowledge is important in the context where many organisations are considering implementing project management offices with nurse managers as leaders. A descriptive multiple case study design was used. The unit of analysis was the project management offices. The study was conducted in three university-affiliated teaching hospitals in 2013-14 (Canada). Individual interviews (n = 34) were conducted with senior managers. Results reveal that project management offices dedicated to project and change management constitute an innovation and an added value that addresses tangible needs in the field. Project management offices are an innovation highly compatible with health care managers and their approach has parallels to the process of clinical problem solving and reasoning well-known to adopters. This knowledge is important in a context where many nurses hold various roles in project management offices, such as Director, project manager, clinical expert and knowledge broker. © 2017 John Wiley & Sons Ltd.

  9. Batavia Boy Scouts | News

    Science.gov Websites

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  10. The integrated scheduling system: A case study in project management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.

    1989-01-01

    A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

  11. FIFRA Project Officers Manual

    EPA Pesticide Factsheets

    The FIFRA Project Officers Manual provides guidance to new as well as experienced project officers in the management of grants and cooperative agreements under the Federal Insecticide, Fungicide and Rodenticide Act.

  12. Buy or sell used musical instruments | News

    Science.gov Websites

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  13. David Toback re-elected CDF co-spokesperson | News

    Science.gov Websites

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  14. Alaska Department of Natural Resources

    Science.gov Websites

    Department of Natural Resources logo Department of Natural Resources Office of Project Management & Restoration Coastal Impact Assistance Program Natural Resources / Office of Project Management & ; Permitting Welcome to the Office of Project Management & Permitting Large Project Coordination The

  15. Bioremediation of Uranium-Contaminated Groundwater using Engineered Injection and Extraction

    NASA Astrophysics Data System (ADS)

    Greene, J. A.; Neupauer, R.; Ye, M.; Kasprzyk, J. R.; Mays, D. C.; Curtis, G. P.

    2017-12-01

    During in-situ remediation of contaminated groundwater, a treatment chemical is injected into the contaminated groundwater to react with and degrade the contaminant, with reactions occurring where the treatment chemical contacts the contaminant. Traditional in-situ groundwater remediation relies on background groundwater flow for spreading of treatment chemicals into contaminant plumes. Engineered Injection and Extraction (EIE), in which time-varying induced flow fields are used to actively spread the treatment chemical into the contaminant plume, has been developed to increase contact between the contaminant and treatment chemical, thereby enhancing contaminant degradation. EIE has been investigated for contaminants that degrade through irreversible bimolecular reaction with a treatment chemical, but has not been investigated for a contaminant governed by reversible reactions. Uranium primarily occurs in its aqueous, mobile form, U(VI), in the environment but can be bioreduced to its sparingly soluble, immobile form, U(IV), by iron reducing bacteria stimulated by an acetate amendment. In this study, we investigate the ability of EIE to facilitate and sustain favorable conditions to immobilize uranium during remediation, and to prevent re-mobilization of uranium into the aqueous phase after active remediation has ended. Simulations in this investigation are conducted using a semi-synthetic model based on physical and chemical conditions at the Naturita Uranium Mill Tailings Remedial Action (UMTRA) site in southwestern Colorado and the Old Rifle UMTRA site in western Colorado. The EIE design is optimized for the synthetic model using the Borg multi-objective evolutionary algorithm.

  16. 18 CFR 376.204 - Delegation of Commission authority during emergency conditions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the Office of Energy Projects; (v) Director of the Office of Electric Reliability; (vi) Director of... Energy Projects, in order of seniority; (x) Deputy Directors, Office of Electric Reliability, in order of... Energy Projects; Assistant Directors and Division heads, Office of Electric Reliability; Deputy Associate...

  17. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... directive whatever. (d) All technical directions must be issued in writing by the project officer or must be... advise the contractor in writing that, in the contracting officer's opinion, the technical direction is... subject to the technical direction of the NRC project officer. The term technical direction is defined to...

  18. From Nigel Lockyer: Five things you should know | News

    Science.gov Websites

    Financial Officer Finance Section Office of the Chief Operating Officer Facilities Engineering Services Accelerator Division Accelerator Physics Center Office of the Chief Safety Officer Environment, Safety, Health and Quality Section Office of the Chief Project Officer Office of Project Support Services Office of

  19. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 470.311 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL... Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  20. 20. DETAIL OF OFFICE FURNITURE IN NORTHEAST CORNER OF SECRETARIES' ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. DETAIL OF OFFICE FURNITURE IN NORTHEAST CORNER OF SECRETARIES' OFFICE ALONG NORTH SIDE OF FIRST FLOOR. VIEW TO NORTHEAST. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  1. Smart Gun Technology project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiss, D.R.

    The goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user form firing a law officer`s firearm by implementing user-recognizing-and-authorizing (or {open_quotes}smart{close_quotes}) surety technologies. This project was funded by the National Institute of Justice. This report lists the findings and results of the project`s three primary objectives. First, to find and document the requirements for a smart firearm technology that law enforcement officers will value. Second, to investigate, evaluate, and prioritize technologies that meet the requirements for a law enforcement officer`s smart firearm. Third, to demonstrate and document the most promising technology`s usefulness inmore » models of a smart firearm.« less

  2. 77 FR 5023 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-01

    ... proposed information collection project: ``Medical Office Survey on Patient Safety Culture Comparative... . SUPPLEMENTARY INFORMATION: Proposed Project Medical Office Survey on Patient Safety Culture Comparative Database... AHRQ Medical Office Survey on Patient Safety Culture (Medical Office SOPS) Comparative Database. The...

  3. 18 CFR 16.8 - Consultation requirements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ....6 of this chapter. (4) The Director of the Office of Energy Projects will, upon request, provide a... otherwise extended by the Director of Office of Energy Projects pursuant to paragraph (b)(6) of this section... Office of Energy Projects (Director) for resolution. (ii) The entity referring the dispute must serve a...

  4. 18 CFR 16.8 - Consultation requirements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ....6 of this chapter. (4) The Director of the Office of Energy Projects will, upon request, provide a... otherwise extended by the Director of Office of Energy Projects pursuant to paragraph (b)(6) of this section... Office of Energy Projects (Director) for resolution. (ii) The entity referring the dispute must serve a...

  5. 18 CFR 16.8 - Consultation requirements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ....6 of this chapter. (4) The Director of the Office of Energy Projects will, upon request, provide a... otherwise extended by the Director of Office of Energy Projects pursuant to paragraph (b)(6) of this section... Office of Energy Projects (Director) for resolution. (ii) The entity referring the dispute must serve a...

  6. Technical Support Services for the Office of Naval Research Littoral Warfare Advanced Development Project

    DTIC Science & Technology

    2005-09-30

    Technical Support Services for the Office of Naval Research Littoral Warfare Advanced Development Project William R. Metzger Marine...Support Services for the Office of Naval Research Littoral Warfare Advanced Development Project 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT

  7. OPERATION DOMINIC. FISH BOWL SERIES. Project Officer’s Report. Project 8A.3. Close-In Thermal and X-Ray Vulnerability Measurements--Shots Blue Gill and King Fish

    DTIC Science & Technology

    1985-09-01

    QDC hLt umi ^ POR.2037 (WT-2037)(EX) VOLUME 1 EXTRACTED VERSION OPERATION DOMINIC, FISH BOWL SERIES Project Officer’s Report—Project 8A.3...Close-In Thermal and X-ray Vulnerability Measurements—Shots Blue Gill and King Fish F. D. Adams, Project Officer Flight Dynamics Laboratory Wright...version of POR-2037 (WT-2037), Volume 1, OPERATION DOMINIC; Fish Bowl Series, Project 8A. 3. Approved for public release; distribution is unlimited

  8. 18 CFR 375.308 - Delegations to the Director of the Office of Energy Projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Director of the Office of Energy Projects. 375.308 Section 375.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION Delegations § 375.308 Delegations to the Director of the Office of Energy Projects. The Commission authorizes...

  9. 18 CFR 375.308 - Delegations to the Director of the Office of Energy Projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Director of the Office of Energy Projects. 375.308 Section 375.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION Delegations § 375.308 Delegations to the Director of the Office of Energy Projects. The Commission authorizes...

  10. 18 CFR 375.308 - Delegations to the Director of the Office of Energy Projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Director of the Office of Energy Projects. 375.308 Section 375.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION Delegations § 375.308 Delegations to the Director of the Office of Energy Projects. The Commission authorizes...

  11. 18 CFR 375.308 - Delegations to the Director of the Office of Energy Projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Director of the Office of Energy Projects. 375.308 Section 375.308 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES THE COMMISSION Delegations § 375.308 Delegations to the Director of the Office of Energy Projects. The Commission authorizes...

  12. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  13. Technical Support for Contaminated Sites

    EPA Science Inventory

    In 1987, the U.S. Environmental Protection Agency’s (EPA) Office of Research and Development (ORD), Office of Land and Emergency Management, and EPA Regional waste management offices established the Technical Support Project. The creation of the Technical Support Project enabled...

  14. Flight Projects Office Information Systems Testbed (FIST)

    NASA Technical Reports Server (NTRS)

    Liggett, Patricia

    1991-01-01

    Viewgraphs on the Flight Projects Office Information Systems Testbed (FIST) are presented. The goal is to perform technology evaluation and prototyping of information systems to support SFOC and JPL flight projects in order to reduce risk in the development of operational data systems for such projects.

  15. 75 FR 71726 - Central Utah Project Completion Act

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-24

    ... DEPARTMENT OF THE INTERIOR Central Utah Project Completion Act AGENCY: Department of the Interior..., Orem, Utah 84058-7303. Department of the Interior, Central Utah Project Completion Act Office, 302 East....cupcao.gov . FOR FURTHER INFORMATION: Contact Mr. Lee Baxter, Central Utah Project Completion Act Office...

  16. Estimates of the Officer Force Structure Required to Man the Projected Naval Combatant Forces of the 1980s and 1990s.

    DTIC Science & Technology

    1980-10-01

    Element, 64709N Prototype Manpower/Personnel Systems (U), Project Z1302-PN Officer Career Models (U), funded by the Office of the Deputy Assistant... Models for Navy Officer Billets portion of the proposed NPS research effort to develop an integrated officer system planning model ; the purpose of this...attempting to model the Naval officer force structure as a system. This study considers the primary first order factors which drive the requirements

  17. 48 CFR 836.602-2 - Evaluation boards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Management projects. The Director, Office of Construction and Facilities Management, shall appoint an... appropriate for the particular project. The Director, Office of Construction and Facilities Management may... Evaluation boards. (a) The Director, Office of Construction and Facilities Management, shall appoint an...

  18. 5 CFR 470.301 - Program expectations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....301 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.301 Program expectations. (a) Demonstration projects permit the Office of Personnel...

  19. 78 FR 53477 - Notice of Relocation of the Bureau of Land Management's San Pedro Project Office in Sierra Vista, AZ

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLAZG02000.L143000000.EQ0000.TAS:14X1109.241A] Notice of Relocation of the Bureau of Land Management's San Pedro Project Office in Sierra Vista... relocation of the Bureau of Land Management's (BLM) San Pedro Project Office (SPPO), temporary closure of the...

  20. Smart gun technology requirements preliminary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weiss, D.R.; Brandt, D.J.; Tweet, K.D.

    Goal of the Smart Gun Technology project is to eliminate the capability of an unauthorized user from firing a law enforcement officer`s firearm by implementing user-recognizing-and-authorizing surety technologies. This project is funded by the National Institute of Justice. This document reports the projects first objective: to find and document the requirements for a user-recognizing-and-authorizing firearm technology that law enforcement officers will value. This report details the problem of firearm takeaways in law enforcement, the methodology used to develop the law enforcement officers` requirements, and the requirements themselves.

  1. 18 CFR 376.204 - Delegation of Commission's authority during emergency conditions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ...; (viii) Deputy Directors, Office of Energy Projects, in order of seniority; (ix) Deputy Directors, Office... Energy Projects; Assistant Directors and Division heads, Office of Electric Reliability; Deputy Associate... Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES ORGANIZATION...

  2. 18 CFR 376.204 - Delegation of Commission's authority during emergency conditions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...; (viii) Deputy Directors, Office of Energy Projects, in order of seniority; (ix) Deputy Directors, Office... Energy Projects; Assistant Directors and Division heads, Office of Electric Reliability; Deputy Associate... Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES ORGANIZATION...

  3. 18 CFR 376.204 - Delegation of Commission's authority during emergency conditions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...; (viii) Deputy Directors, Office of Energy Projects, in order of seniority; (ix) Deputy Directors, Office... Energy Projects; Assistant Directors and Division heads, Office of Electric Reliability; Deputy Associate... Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REVISED GENERAL RULES ORGANIZATION...

  4. 1. Photographic copy of photograph, in possession of SCIP Office, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. Photographic copy of photograph, in possession of SCIP Office, Coolidge, AZ. No date, circa 1940. Photographer unknown. HEADQUARTERS OFFICE, 205 W. ROOSEVELT, COOLIDGE, AZ. - San Carlos Irrigation Project, San Carlos Irrigation Project Headquarters, 205 West Roosevelt, Coolidge, Pinal County, AZ

  5. 18 CFR 12.2 - Rules of construction.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS... relevant provision of this part, unless the Commission or the Director of the Office of Energy Projects..., health, or property. (b) A licensee may request from the Director of the Office of Energy Projects...

  6. 18 CFR 12.2 - Rules of construction.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS... relevant provision of this part, unless the Commission or the Director of the Office of Energy Projects..., health, or property. (b) A licensee may request from the Director of the Office of Energy Projects...

  7. 18 CFR 12.2 - Rules of construction.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS... relevant provision of this part, unless the Commission or the Director of the Office of Energy Projects..., health, or property. (b) A licensee may request from the Director of the Office of Energy Projects...

  8. 18 CFR 12.2 - Rules of construction.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT SAFETY OF WATER POWER PROJECTS AND PROJECT WORKS... relevant provision of this part, unless the Commission or the Director of the Office of Energy Projects..., health, or property. (b) A licensee may request from the Director of the Office of Energy Projects...

  9. [Factors associated with investment in an office medicine project by general practice residents].

    PubMed

    Munck, Stéphane; Massin, Sophie; Hofliger, Philippe; Darmon, David

    2015-01-01

    To identify thefactors associated with investment in an office medicine project by French general practice (GP) residents. We conducted a national survey using a web-based self-administered questionnaire and analyzed the data collected by multiple logistic regressions. The dependent variable was "an office medicine project" The explanatory variables were both individual (socio-demographic and linked to training trajectories) and contextual (related to the available training programmes and the regional medical demography). The response rate was 48.5%. Out of the 1,695 residents of the study sample, 315 (18.6%) already had a project to setup an office practice during their third cycle ofmedical studies. The main factors associated with this project were (p < 0.05): to receive strong academic support, to live in a rural or semi-rural area, to work as a GP locum, to perform residency training in the same city as the medical training and to perform residency training in a region with a high percentage of GPs 55years and older. This study showed that a project to setup an office practice was influenced by both individual and contextualfactors. Special attention should be paid to the means and content of training to ensure better supportfor residents, which could make office general practice more attractive.

  10. Electrical engineering research support for FDOT Traffic Statistics Office

    DOT National Transportation Integrated Search

    2010-03-01

    The aim of this project was to provide electrical engineering support for the telemetered traffic monitoring sites (TTMSs) operated by the Statistics Office of the Florida Department of Transportation. This project was a continuation of project BD-54...

  11. 78 FR 48661 - Application for Presidential Permit; Soule River Hydroelectric Project: Correction

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... Hydroelectric Project: Correction AGENCY: Office of Electricity Delivery and Energy Reliability, DOE. ACTION: Notice of Application; correction. SUMMARY: The Department of Energy (DOE) Office of Electricity Delivery..., Office of Electricity Delivery and Energy Reliability (OE-20), U.S. Department of Energy, 1000...

  12. Discretionary Grants Administration Manual.

    ERIC Educational Resources Information Center

    Office of Human Development Services (DHHS), Washington, DC.

    This manual sets forth applicable administrative policies and procedures to recipients of discretionary project grants or cooperative agreements awarded by program offices in the Office of Human Development Services (HDS). It is intended to serve as a basic reference for project directors and business officers of recipient organizations who are…

  13. Using Project Management Systems at the Construction Field Office

    DTIC Science & Technology

    1989-03-01

    instrumentation 13550 transportation control instrumentation 13600 solor energy systems 13700 wind energy systems 13800 building automation systems ...Engineering Research Laboratory AD-A207 077 Using Project Management Systems at the Construction Field Office by E. William East Jeffrey G. Kirby Automated...automated systems available, engineers at the construction fieid office (or resident office) are faced with the over- whelming task of choosing which

  14. Low Emissions Alternative Power (LEAP) Project Office Business Team of the Aeropropulsion Research Program Office (ARPO) Org. 0140

    NASA Technical Reports Server (NTRS)

    Buttler, Jennifer A.

    2004-01-01

    The program for which I am working at this summer is Propulsion and Power/Low Emissions Alternative Power (P&P/LEAP). It invests in a fundamental TRL 1-6 research and technology portfolio that will enable the future of: Alternative fuels and/or alternative propulsion systems, non-combustion (electric) propulsion systems. P&P/LEAP will identify and capitalize on the highest potential concepts generated both internal and external to the Agency. During my 2004 summer at NASA Glenn Research Center, I worked with my mentor Barbara Mader, in the Project Office with the Business Team completing various tasks for the project and personnel. The LEAP project is a highly matrixed organization. The Project Office is responsible for the goals advocacy and dollar (budget) of the LEAP project. The objectives of the LEAP Project are to discover new energy sources and develop unconventional engines and power systems directed towards greatly reduced emissions, enable new vehicle concepts for public mobility, new science missions and national security. The Propulsion and PowerLow Emissions Alternative Power directly supports the environmental, mobility, national security objectives of the Vehicle Systems Program and the Aeronautics Technology Theme. Technology deliverables include the demonstration through integrated ground tests, a constant volume combustor in an engine system, and UAV/small transport aircraft all electric power system. My mentor serves as a key member of the management team for the Aeropropulsion Research Program Office (ARPO). She has represented the office on numerous occasions, and is a member of a number of center-wide panels/teams, such as the Space management Committee and is chair to the Business Process Consolidation Team. She is responsible for the overall coordination of resources for the Propulsion and Power Project - from advocacy to implementation. The goal for my summer at NASA was to document processes and archive program documents from the past years. I used the computer and office machines, and also worked with personnel in setting up a Cost Estimation Plan. I gained office experience in Word, Excel, and Power Point, with the completion of a variety of tasks. I made spreadsheets that pertained to the budget plan for Journey to Tomorrow, to name a few I have supported the office by tracking resource information: including programmatic travel, project budget at the center level to budgets for individual research sub-projects and grants. I also assisted the Program Support Office in their duties including, representing the office on numerous occasions on center-wide team/panels, such as the Space management committee, IFMP Budget Formulation, Journey to Tomorrow Committee, and the Vehicle Systems Program Business Process Team.

  15. 18 CFR 157.8 - Acceptance for filing or rejection of applications.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., the Director of the Office of Energy Projects or the Director of the Office of Energy Market... Projects or the Director of the Office of Energy Market Regulation may also reject an application after it... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR...

  16. 18 CFR 157.8 - Acceptance for filing or rejection of applications.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., the Director of the Office of Energy Projects or the Director of the Office of Energy Market... Projects or the Director of the Office of Energy Market Regulation may also reject an application after it... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR...

  17. 18 CFR 157.8 - Acceptance for filing or rejection of applications.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., the Director of the Office of Energy Projects or the Director of the Office of Energy Market... Projects or the Director of the Office of Energy Market Regulation may also reject an application after it... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR...

  18. 18 CFR 157.8 - Acceptance for filing or rejection of applications.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., the Director of the Office of Energy Projects or the Director of the Office of Energy Market... Projects or the Director of the Office of Energy Market Regulation may also reject an application after it... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER NATURAL GAS ACT APPLICATIONS FOR...

  19. 78 FR 20351 - Notice of Proposed Information Collection; Comment Request: Application for Multifamily Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-04

    ... Information Collection; Comment Request: Application for Multifamily Project Mortgage Insurance AGENCY: Office...). FOR FURTHER INFORMATION CONTACT: Ted Toon, Director, Office of Multifamily Development, Department of... following information: Title of Proposal: Application for Multifamily Project Mortgage Insurance. OMB...

  20. 7 CFR 2.37 - Chief Information Officer.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... technology program or project. (3) Providing advice and other assistance to the Secretary and other senior... selection of agency Chief Information Officers and agency major information technology system project... recommendations to Agency Heads for the removal or replacement of information technology project managers, when...

  1. Economics in Counterinsurgency: Analyzing and Applying History’s Lessons on Economic Strategy

    DTIC Science & Technology

    2014-06-13

    Reconstruction and Humanitarian Affairs PCO Project and Contracting Office PRT Provincial Reconstruction Team SIGAR Special Inspector General for...and Contracting Office, or PCO , appear to have been unmindful of the historical ERP’s strengths and weaknesses. . . . One might say, without undue...purview of the US Embassy mission, which established the Iraqi Reconstruction and Management Office (IRMO) and the Project and Contracting Office ( PCO

  2. Project Manager Performance and the Decision to Backsource the Project Management Office

    ERIC Educational Resources Information Center

    Lively, William R.

    2014-01-01

    This paper reviews a management decision of an Information Technology Outsource (ITO) provider to backshore the management oversight of its Project Management Office (PMO) after only one year of offshore operations. Governance is a term used in project management to refer to management oversight. The review is a quantitative analysis of existing…

  3. Data Overload Impact on Project Management: How Knowledge Management Systems Can Improve Federal Agencies Effectiveness

    ERIC Educational Resources Information Center

    Rodriguez, Jacinto

    2013-01-01

    This mixed method exploratory case study was used to explore the effect data overload has on project management, how data overload affects project management effectiveness, how prepared program office staff is to manage multiple projects effectively, and how the program office's organizational structure and data management systems affect project…

  4. 78 FR 8389 - Natural Gas Pipelines; Project Cost and Annual Limits

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... Director of the Office of Energy Projects. The cost limits for calendar year 2013, as published in Table I.... ACTION: Final rule. SUMMARY: Pursuant to the authority delegated by 18 CFR 375.308(x)(1), the Director of the Office of Energy Projects (OEP) computes and publishes the project cost and annual limits for...

  5. Office of Maternal and Child Health Active Projects FY 1989. An Annotated Listing.

    ERIC Educational Resources Information Center

    National Center for Education in Maternal and Child Health, Washington, DC.

    An annotated listing is presented of projects offering maternal and child health care services. These projects, referred to as special projects of regional and national significance (SPRANS), are supported by the Office of Maternal and Child Health of the Department of Health and Human Services. The first section provides information on services…

  6. 35. Photographic copy of historic photo, c1915 (original print in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    35. Photographic copy of historic photo, c1915 (original print in Still Photo Branch of the National Archives, RG-155-JC, Washington, DC; photographer unknown). FRONT VIEW OF BOISE PROJECT OFFICE SHOWING UNITED STATES RECLAMATION SERVICE BOISE PROJECT CLERICAL AND ENGINEERING STAFF. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  7. 5 CFR 470.103 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Project means a project conducted by the Office of Personnel Management, or under its supervision, to... Federal personnel management (5 U.S.C. 4701). The project must require the waiver of a provision of law... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH...

  8. Contract Oversight for Redistribution Property Assistance Team Operations in Afghanistan Needs Improvement

    DTIC Science & Technology

    2015-05-18

    Aircraft Systems ( SUAS ) Project Office, located in Huntsville, AL, for reset. For return to the SUAS Project Office, 401st AFSB officials stated, the...representatives from SUAS Project Office contacted the 401st AFSB COR at BAF to state that the systems arrived in Huntsville, AL. However, prior to SUAS ...circumstances behind the loss. AC First’s research identified that AC First shipped the systems to SUAS officials at BAF instead of the BAF RPAT

  9. Office of Indian Affairs Progress Report, June 1977, State of New Mexico.

    ERIC Educational Resources Information Center

    New Mexico State Commission on Indian Affairs, Santa Fe.

    Included in this report on the New Mexico Office of Indian Affairs are brief sections dealing with: the Agency's background; past projects and future goals; the Research and Statistics Center; projects under consideration; and the Agency's Tribal Liaison Officer, Tribal Relations Specialist; and Planner. Cited as major Agency accomplishments…

  10. Accelerating Project and Process Improvement using Advanced Software Simulation Technology: From the Office to the Enterprise

    DTIC Science & Technology

    2010-04-29

    Technology: From the Office Larry Smith Software Technology Support Center to the Enterprise 517 SMXS/MXDEA 6022 Fir Avenue Hill AFB, UT 84056 801...2010 to 00-00-2010 4. TITLE AND SUBTITLE Accelerating Project and Process Improvement using Advanced Software Simulation Technology: From the Office to

  11. 48 CFR 1553.209-71 - EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Officer's Evaluation of Contractor Performance. 1553.209-71 Section 1553.209-71 Federal Acquisition Regulations System ENVIRONMENTAL PROTECTION AGENCY CLAUSES AND FORMS FORMS Prescription of Forms 1553.209-71 EPA Form 1900-27, Project Officer's Evaluation of Contractor Performance. As prescribed in 1509.170-4...

  12. 78 FR 16476 - Notice for Termination of a Disease Management Demonstration Project for TRICARE Standard...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... Management Demonstration Project for TRICARE Standard Beneficiaries.'' The demonstration provided disease... DEPARTMENT OF DEFENSE Office of the Secretary Notice for Termination of a Disease Management Demonstration Project for TRICARE Standard Beneficiaries AGENCY: Office of the Secretary of Defense, (Health...

  13. 76 FR 5188 - Notice of Proposed Information Collection: Comment Request; Application for Multifamily Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-28

    ... Information Collection: Comment Request; Application for Multifamily Project Mortgage Insurance AGENCY: Office... Service (1-800-877-8339). FOR FURTHER INFORMATION CONTACT: Joyce Allen, Director, Office of Multifamily...: Application for Multifamily Project Mortgage Insurance. OMB Control Number, if applicable: 2502-0029...

  14. 77 FR 31302 - Review of Federal Permit Conditions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ...'' because the agency believes this should be interpreted based on the circumstances of the project at the... OFFICE OF THE FEDERAL COORDINATOR FOR ALASKA NATURAL GAS TRANSPORTATION PROJECTS Review of Federal... Projects. ACTION: Notice of Adoption of Final Policy. SUMMARY: The Office of the Federal Coordinator for...

  15. 36. Photographic copy of historic photo, c1915 (original print in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    36. Photographic copy of historic photo, c1915 (original print in Still Photo Branch of the National Archives, RG-155-JC, Washington, DC; photographer unknown). VIEW OF NORTH SIDE OF BOISE PROJECT OFFICE. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  16. 18 CFR 16.26 - Disposition of a project for which no timely application is filed following a notice of intent...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... the Federal Power Act, the Director of the Office of Energy Projects will provide the existing... Office of Energy Projects. (c) Any application for surrender must be filed according to the approved... project for which no timely application is filed following a notice of intent not to file. 16.26 Section...

  17. 18 CFR 16.26 - Disposition of a project for which no timely application is filed following a notice of intent...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... the Federal Power Act, the Director of the Office of Energy Projects will provide the existing... Office of Energy Projects. (c) Any application for surrender must be filed according to the approved... project for which no timely application is filed following a notice of intent not to file. 16.26 Section...

  18. 18 CFR 16.26 - Disposition of a project for which no timely application is filed following a notice of intent...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... the Federal Power Act, the Director of the Office of Energy Projects will provide the existing... Office of Energy Projects. (c) Any application for surrender must be filed according to the approved... project for which no timely application is filed following a notice of intent not to file. 16.26 Section...

  19. 18 CFR 16.26 - Disposition of a project for which no timely application is filed following a notice of intent...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... the Federal Power Act, the Director of the Office of Energy Projects will provide the existing... Office of Energy Projects. (c) Any application for surrender must be filed according to the approved... project for which no timely application is filed following a notice of intent not to file. 16.26 Section...

  20. 18 CFR 16.26 - Disposition of a project for which no timely application is filed following a notice of intent...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the Federal Power Act, the Director of the Office of Energy Projects will provide the existing... Office of Energy Projects. (c) Any application for surrender must be filed according to the approved... project for which no timely application is filed following a notice of intent not to file. 16.26 Section...

  1. 4. DETAIL OF EAST SIDE, SHOWING TRACK SUPERVISOR'S OFFICE PROJECTION. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. DETAIL OF EAST SIDE, SHOWING TRACK SUPERVISOR'S OFFICE PROJECTION. VIEW TO WEST. - Commercial & Industrial Buildings, Illinois Central Railroad Passenger Depot, Iowa & Jones Streets, Dubuque, Dubuque County, IA

  2. 40 CFR 35.936-16 - Code or standards of conduct.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... provide for penalties, sanctions, or other adequate disciplinary actions to be instituted for project... their agents. The grantee must also inform the project officer of the prosecutive or disciplinary action... disciplinary action. Under § 30.245 of this subchapter, the project officer must notify the Director, EPA...

  3. 75 FR 45147 - Notice of Submission of Proposed Information Collection to OMB; Multifamily Project Construction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-02

    ... Proposed Information Collection to OMB; Multifamily Project Construction Contract, Building Loan Agreement, & Construction Change; HUD Programs AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY.../borrowers, and mortgagees/lenders for construction of multifamily projects and to obtain approval of changes...

  4. 76 FR 56973 - Office of National Marine Sanctuaries Final Policy and Permit Guidance for Submarine Cable Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-15

    ... National Marine Sanctuaries Final Policy and Permit Guidance for Submarine Cable Projects AGENCY: Office of National Marine Sanctuaries (ONMS), National Oceanic and Atmospheric Administration (NOAA), Department of... Marine Sanctuaries (ONMS) has developed final policy and permitting guidance for submarine cable projects...

  5. 34 CFR 380.3 - What types of projects are authorized?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What types of projects are authorized? 380.3 Section 380.3 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS...

  6. EPA Region 10 Climate Change and TMDL Pilot Project - South Fork Nooksack River, Washington

    EPA Science Inventory

    The U.S. Environmental Protection Agency (EPA) Region 10 and EPA’s Office of Research and Development (ORD) and Office of Water (OW) have launched a pilot research project to consider how projected climate change impacts could be incorporated into a TMDL and influence restoration...

  7. 16. Photocopy of original USRS photograph (from original print in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photocopy of original USRS photograph (from original print in the Umatilla Project History 1918, on file at National Archives, Rocky Mountain Region, Denver, Colorado) Photographer unknown, ca. 1918. Office of U.S. Reclamation Service - Hermiston, Umatilla Project, Oregon - Former Umatilla Project Headquarters Buildings, Office, Hermiston, Umatilla County, OR

  8. Office of the Chief Financial Officer Annual Report 2009

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fernandez, Jeffrey

    2009-12-15

    Presented is the 2009 Chief Financial Officer's Annual Report. The data included in this report has been compiled from the Budget Office, the Controller, Procurement and Property Management and the Sponsored Projects Office.

  9. OPERATION HARDTACK. Project 3.5. Loading and Response of Submarine Hulls from Underwater Bursts

    DTIC Science & Technology

    1985-09-01

    Bursts H. L. Rich, Project Officer F. Weinberger E. T. Habib R. L. Bor W. J. Sette David Taylor Model Basin Washington, DC 15 December 1960 NOTICE: This...Hulls from Underwater Bursts, Extracted Version 12. PERSONAL AUTHOR(S) Rich, H.L., Project Officer; Weinberger, F.; Habib , E.T.; Bort, R.L.; Sette, W.J...SLO A D IN G oa n d R E S P O N S E o f S U B M A R IN E tULLS from UNDERWATER BURSTS H. L. Rich, Project Officer F. Weinberger E.T. Habib R.L. Bort W

  10. 34 CFR 75.112 - Include a proposed project period and a timeline.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Include a proposed project period and a timeline. 75.112 Section 75.112 Education Office of the Secretary, Department of Education DIRECT GRANT PROGRAMS... to meet each objective of the project. (Approved by the Office of Management and Budget under control...

  11. 18 CFR 16.5 - Site access for a competing applicant.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... in providing access, including energy generation lost as a result of modification of project... the Office of Energy Projects for resolution in the manner specified in § 16.8(b)(5) prior to the... access may be referred to the Director of the Office of Energy Projects for resolution in the manner...

  12. 18 CFR 157.205 - Notice procedure.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Director of the Office of Energy Projects shall reject within 10 days of the date of filing a request which... Energy Projects or his designee. If a protest is not withdrawn or dismissed pursuant to paragraph (g) of... Office of Energy Projects will dismiss that protest if it does not raise a substantive issue and fails to...

  13. 18 CFR 16.5 - Site access for a competing applicant.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... in providing access, including energy generation lost as a result of modification of project... the Office of Energy Projects for resolution in the manner specified in § 16.8(b)(5) prior to the... access may be referred to the Director of the Office of Energy Projects for resolution in the manner...

  14. 18 CFR 16.5 - Site access for a competing applicant.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... in providing access, including energy generation lost as a result of modification of project... the Office of Energy Projects for resolution in the manner specified in § 16.8(b)(5) prior to the... access may be referred to the Director of the Office of Energy Projects for resolution in the manner...

  15. 18 CFR 157.205 - Notice procedure.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Director of the Office of Energy Projects shall reject within 10 days of the date of filing a request which... Energy Projects or his designee. If a protest is not withdrawn or dismissed pursuant to paragraph (g) of... Office of Energy Projects will dismiss that protest if it does not raise a substantive issue and fails to...

  16. 18 CFR 157.205 - Notice procedure.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Director of the Office of Energy Projects shall reject within 10 days of the date of filing a request which... Energy Projects or his designee. If a protest is not withdrawn or dismissed pursuant to paragraph (g) of... Office of Energy Projects will dismiss that protest if it does not raise a substantive issue and fails to...

  17. 18 CFR 157.205 - Notice procedure.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Director of the Office of Energy Projects shall reject within 10 days of the date of filing a request which... Energy Projects or his designee. If a protest is not withdrawn or dismissed pursuant to paragraph (g) of... Office of Energy Projects will dismiss that protest if it does not raise a substantive issue and fails to...

  18. 18 CFR 16.5 - Site access for a competing applicant.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... in providing access, including energy generation lost as a result of modification of project... the Office of Energy Projects for resolution in the manner specified in § 16.8(b)(5) prior to the... access may be referred to the Director of the Office of Energy Projects for resolution in the manner...

  19. 18 CFR 157.205 - Notice procedure.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Director of the Office of Energy Projects shall reject within 10 days of the date of filing a request which... Energy Projects or his designee. If a protest is not withdrawn or dismissed pursuant to paragraph (g) of... Office of Energy Projects will dismiss that protest if it does not raise a substantive issue and fails to...

  20. 18 CFR 16.5 - Site access for a competing applicant.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... in providing access, including energy generation lost as a result of modification of project... the Office of Energy Projects for resolution in the manner specified in § 16.8(b)(5) prior to the... access may be referred to the Director of the Office of Energy Projects for resolution in the manner...

  1. Preliminary Evaluation of Office of Academic Achievement's Programs 1990-1991. Report No. 91-4.

    ERIC Educational Resources Information Center

    Swanson, Judy

    Three programs sponsored by the Seattle (Washington) public schools' Office of Academic Achievement were evaluated: the Academic Achievement Project, Early Childhood Model (ECM) Schools, and Pilot Projects. Academic Achievement projects were designed to increase the academic achievement of at-risk learners and to decrease disproportionality. The…

  2. Manpower Training Coordinators Project. Final Report. Experimental Project in Vocational Education.

    ERIC Educational Resources Information Center

    Smith, E. Jimmy

    On June 1, 1980, the South Carolina Department of Education, Office of Vocational Education, entered into a contractual agreement with the Governor's Office, CETA Division, for the purpose of operating a Manpower Training Coordinators Program in 10 school districts serving rural areas. The project was designed to establish and maintain effective…

  3. PGIS (Project Grant Information System) Taxonomy [Rough Draft].

    ERIC Educational Resources Information Center

    North American Rockwell Information Systems Co., Arlington, VA.

    The Project Grant Information System (PGIS) is a computerized information indexing and retrieval system which supports the U.S. Office of Education. Its purpose is to provide OE officials with up-to-date information about the Office's discretionary grant programs and projects. The purpose of the Taxonomy is to provide: (1) those individuals who…

  4. 34 CFR 379.1 - What is the Projects With Industry (PWI) program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What is the Projects With Industry (PWI) program? 379.1 Section 379.1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY General...

  5. 34 CFR 376.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What types of projects are authorized under this program? 376.10 Section 376.10 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS...

  6. 34 CFR 376.1 - What is the program of Special Projects and Demonstrations for Providing Transitional...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What is the program of Special Projects and....1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION SPECIAL PROJECTS AND DEMONSTRATIONS FOR...

  7. 34 CFR 388.3 - What types of projects are authorized?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What types of projects are authorized? 388.3 Section 388.3 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF... UNIT IN-SERVICE TRAINING General § 388.3 What types of projects are authorized? State vocational...

  8. Building Bridges: Using the Office Consultation Project to Connect Students to Theory and Practice

    ERIC Educational Resources Information Center

    Wawrzynski, Korine Steinke; Jessup-Anger, Jody E.

    2014-01-01

    The Office Consultation Project is an innovative capstone project that partners graduate students in student affairs preparation programs with academic and student affairs practitioners. It provides an opportunity for students to apply research and scholarship to practical settings, while giving practitioners new insight into their units,…

  9. 34 CFR 645.12 - How are regular Upward Bound projects organized?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false How are regular Upward Bound projects organized? 645.12 Section 645.12 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION UPWARD BOUND PROGRAM What Kinds of Projects and Services Does...

  10. Region 9 Tribal Grant Program - Project Officer and Tribal Contact Information Map Service

    EPA Pesticide Factsheets

    This compilation of geospatial data is for the purpose of managing and communicating information about current EPA project officers, tribal contacts, and tribal grants, both internally and with external stakeholders.

  11. EHS and FME Lend Their Expertise to NCI Campus Refurbishment Project | Poster

    Cancer.gov

    In October 2015, the NCI executive officer and the director of NCI’s Office of Space and Facilities Management (OSFM) announced a wide-ranging refurbishment plan for NCI at Frederick. Since then, a project team comprising members from the Office of Scientific Operations, the Management Operations Support Branch, OSFM, the Center for Cancer Research, the Environment, Health,

  12. Managment and construction of the Large Binocular Telescope enclosure: Meeting unusual challenges with a competitive discipline

    NASA Astrophysics Data System (ADS)

    Slagle, James H.; Hill, John M.; Davison, Warren B.; Hart, Wood; Teran, Jose U.

    1998-08-01

    Planning, estimating, and building a telescope and its enclosure within a budget is a challenge to any project staff. The Large Binocular Telescope (LBT) project office goal has been to break every phase of the project into small packages and competitively bid the packages. In this way the project office can minimize costs and keep the project budget from escalating out of control. This paper will discuss both the unique and common problems associated with the building of telescopes into the next millennium. The discussion is centered on the planning and execution phases of construction for the LBT, located on Mt. Graham in Arizona. The paper will discuss the effects of delays on the actual start of the telescope due to environmental issues and the impact the delays had on design and budget. The paper will provide the solutions that have been incorporated by the LBT project office to maximize the quality of construction while holding costs to a minimum. The use of a team approach by the contractors, engineers, and the project office has been successful in maintaining quality construction at a reasonable cost.

  13. The project management office: transforming healthcare in the context of a hospital redevelopment project.

    PubMed

    Richer, Marie-Claire; Marchionni, Caroline; Lavoie-Tremblay, Melanie; Aubry, Monique

    2013-01-01

    It has been shown that classifying projects into a typology allows improved allocation of resources and promotes project success. However, a typology of healthcare projects has yet to be developed. The projects encountered by the Transition Support Office at the McGill University Health Centre in Montreal, Quebec, where a major redevelopment project is under way, were classified into a typology unique to the healthcare context. Examples of the 3 project types, Process, People, and Practice, are provided to clarify the specific support strategies and context-adapted interventions that were instrumental to their success.

  14. Goddard visit

    NASA Image and Video Library

    2011-07-21

    A trio of representatives from Goddard Space Flight Center in Greenbelt, Md., visited Stennis Space Center on July 21-22 to explore opportunities for collaboration. Visitors and hosts included: (seated, l to r) Shahid Habib, chief of the Goddard Office of Applied Sciences; Stennis Director Patrick Scheuermann; Piers Sellers, deputy director of the Goddard Sciences and Exploration Directorate; (standing, l to r) Duane Armstrong, chief of the Stennis Applied Science & Technology Project Office; Fritz Policelli, representative of the Goddard Office of Applied Sciences; Anne Peek, assistant director of the Stennis Project Directorate; and Keith Brock, director of the Stennis Project Directorate.

  15. Geothermal Technologies Office 2012 Peer Review Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2013-04-01

    On May 7-10, 2012, the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, Geothermal Technologies Office conducted its annual program peer review in Westminster, CO. In accordance with the EERE Peer Review Guide, the review provides an independent, expert evaluation of the strategic goals and direction of the office and is a forum for feedback and recommendations on future office planning. The purpose of the review was to evaluate DOE-funded projects for their contribution to the mission and goals of the office and to assess progress made against stated objectives. Project scoring results, expert reviewer comments, andmore » key findings and recommendations are included in this report.« less

  16. Space Shuttle Projects Overview to Columbia Air Forces War College

    NASA Technical Reports Server (NTRS)

    Singer, Jody; McCool, Alex (Technical Monitor)

    2000-01-01

    This paper presents, in viewgraph form, a general overview of space shuttle projects. Some of the topics include: 1) Space Shuttle Projects; 2) Marshall Space Flight Center Space Shuttle Projects Office; 3) Space Shuttle Propulsion systems; 4) Space Shuttle Program Major Sites; 5) NASA Office of Space flight (OSF) Center Roles in Space Shuttle Program; 6) Space Shuttle Hardware Flow; and 7) Shuttle Flights To Date.

  17. Lessons learned from first year cistern monitoring in Camden ...

    EPA Pesticide Factsheets

    Invited panelist for Webinar 08/16/2016 by Office of Water : Lessons Learned from Past Green Infrastructure Projects Invited panelist for Webinar 08/16/2016 by Office of Water : Lessons Learned from Past Green Infrastructure Projects

  18. Report: EPA Managers Did Not Hold Supervisors and Project Officers Accountable for Grants Management

    EPA Pesticide Factsheets

    Report #2005-P-00027, September 27, 2005. Managers did not sufficiently hold supervisors and project officers accountable for grants management because there is no process to measure most grants management activity.

  19. Research and Grant Management: The Role of the Project Management Office (PMO) in a European Research Consortium Context

    ERIC Educational Resources Information Center

    Wedekind, Gerben Kristian; Philbin, Simon Patrick

    2018-01-01

    This paper illustrates how a university-based project management office (PMO) can provide focused support across the entire grant project lifecycle within a European research context. In recent years, EU (European Union) research and innovation grant programs have increasingly shifted to support multidisciplinary consortia composed of industry,…

  20. 34 CFR 380.1 - What is the program of special projects and demonstrations for providing supported employment...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What is the program of special projects and... technical assistance projects? 380.1 Section 380.1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION...

  1. 4. Photographic copy of map. San Carlos Irrigation Project, Gila ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photographic copy of map. San Carlos Irrigation Project, Gila River Indian Reservation, Pinal County, Arizona. Department of the Interior. Office of Indian Affairs. 1940. (Source: SCIP Office, Coolidge, AZ) Photograph is an 8'x10' enlargement from a 4'x5' negative. - San Carlos Irrigation Project, Lands North & South of Gila River, Coolidge, Pinal County, AZ

  2. 2017 Building Technologies Office Peer Review Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The 2017 Building Technologies Office Peer Review Report summarizes the feedback submitted by reviewers for the 109 Building Technologies Office (BTO) projects presented at the 2017 BTO Peer Review. The report presents an overview of the goals and activities under each technology program area, a summary of project scores for each program, and a brief analysis of general evaluation trends within each program area or its constituent subprograms.

  3. Implementation of a Project Management Office (PMO)--experiences from year 1.

    PubMed

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  4. Chemical research projects office: An overview and bibliography, 1975-1980

    NASA Technical Reports Server (NTRS)

    Kourtides, D. A.; Heimbuch, A. H.; Parker, J. A.

    1980-01-01

    The activities of the Chemical Research Projects Office at Ames Research Center, Moffett Field, California are reported. The office conducts basic and applied research in the fields of polymer chemistry, computational chemistry, polymer physics, and physical and organic chemistry. It works to identify the chemical research and technology required for solutions to problems of national urgency, synchronous with the aeronautic and space effort. It conducts interdisciplinary research on chemical problems, mainly in areas of macromolecular science and fire research. The office also acts as liaison with the engineering community and assures that relevant technology is made available to other NASA centers, agencies, and industry. Recent accomplishments are listed in this report. Activities of the three research groups, Polymer Research, Aircraft Operating and Safety, and Engineering Testing, are summarized. A complete bibliography which lists all Chemical Research Projects Office publications, contracts, grants, patents, and presentations from 1975 to 1980 is included.

  5. 7 CFR 2.24 - Assistant Secretary for Administration.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... continue, modify, or terminate an information technology program or project. (iii) Provide advice and other... exchange, scheduling, computer conferencing, televideo technologies, and other applications of office... Chief Information Officers and agency major information technology system project managers in accordance...

  6. 7 CFR 2.24 - Assistant Secretary for Administration.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... continue, modify, or terminate an information technology program or project. (iii) Provide advice and other... exchange, scheduling, computer conferencing, televideo technologies, and other applications of office... Chief Information Officers and agency major information technology system project managers in accordance...

  7. 75 FR 13134 - Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ...)(6). Grant applications for the Medical Liability and Safety Innovation Projects (R21) applications... disclosure under the above- cited statutes. SEP Meeting on: Medical Liability and Safety Innovation Projects..., Committee Management Officer, Office of Extramural Research, Education and Priority Populations, AHRQ, 540...

  8. 7 CFR 2.89 - Chief Information Officer.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... continue, modify, or terminate an information technology program or project. (3) Provide advice and other..., computer conferencing, televideo technologies, and other applications of office automation technology which... technology system project managers in accordance with OMB policies. (iv) Providing recommendations to Agency...

  9. 5 CFR 470.315 - Project modification and extension.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ....315 Section 470.315 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to... plan without the approval of the Office of Personnel Management. OPM will inform the agency of...

  10. 7 CFR 2.89 - Chief Information Officer.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... continue, modify, or terminate an information technology program or project. (3) Provide advice and other..., computer conferencing, televideo technologies, and other applications of office automation technology which... technology system project managers in accordance with OMB policies. (iv) Providing recommendations to Agency...

  11. Artificial Icing Test, Utility Tactical Transport Aircraft System (UTTAS), Boeing Vertol YUH-61A Helicopter

    DTIC Science & Technology

    1977-01-01

    FOR OFFIC!AL USE ONLY VTT 0ff4 -40. -26-: a 20 TEMPATURE (-Q FIGUR~E t:. VMRATIOI4 (W THEMMONMIC FUNCTIOUt WITfLt -EA~UrT IOMMI4MTSRS- SOMiRE; jym...JOHN F. HAGEN MAJ, FA US ARMY JAMES C. O’CONNOR PROJECT OFFICER/PILOT CPT, CE US ARMY EDWARD J. TAVARES PROJECT PILOT CPT, TC US ARMY PROJECT...is no longer needed. Do not return it to the originator. TRADE NAMES The use of trade names in this report does not constitute an official endorsement

  12. 34 CFR 644.3 - Who is eligible to participate in a project?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Who is eligible to participate in a project? 644.3 Section 644.3 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION EDUCATIONAL OPPORTUNITY CENTERS General § 644.3 Who is eligible to participate in a project? (a) An...

  13. 34 CFR 643.3 - Who is eligible to participate in a project?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Who is eligible to participate in a project? 643.3 Section 643.3 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION TALENT SEARCH General § 643.3 Who is eligible to participate in a project? (a) An individual is...

  14. The Lunar Lander "HabiTank" Concept

    NASA Technical Reports Server (NTRS)

    Kennedy, Kriss J.

    2007-01-01

    This paper will summarize the study that was conducted under the auspices of the National Aeronautics and Space Administration (NASA), lead by Johnson Space Center s Engineering Directorate in support of the Lunar Lander Preparatory Study (LLPS) as sponsored by the Constellation Program Office (CxPO), Advanced Projects Office (APO). The lunar lander conceptual design and analysis is intended to provide an understanding of requirements for human space exploration of the Moon using the Advanced Projects Office Pre-Lander Project Office selected "HabiTank" Lander concept. In addition, these analyses help identify system "drivers," or significant sources of cost, performance, risk, and schedule variation along with areas needing technology development. Recommendations, results, and conclusions in this paper do not reflect NASA policy or programmatic decisions. This paper is an executive summary of this study.

  15. 40 CFR 1.33 - Office of Administration and Resources Management.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Management Interns, OHRM establishes policies; assesses and projects Agency executive needs and workforce... out human resources management projects of special interest to Agency management. The Office... Management. 1.33 Section 1.33 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY GENERAL STATEMENT OF...

  16. 40. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). ROOF PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  17. 38. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). FIRST FLOOR PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  18. 37. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). BASEMENT PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  19. 39. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). SECOND FLOOR PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  20. 45. Photographic copy of original construction drawing, dated 16 February ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. Photographic copy of original construction drawing, dated 16 February 1916 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). LOT SURVEY. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  1. 41. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). CROSS SECTIONS. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  2. 48 CFR 304.1300 - Policy.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: As defined by the Computer Security Act of 1987, any data/information, “the loss, misuse, or... Project Officer determines greater access controls are necessary, an OPDIV may protect and control...)]. (c) As part of the acquisition planning process, the Project Officer shall determine whether, based...

  3. 48 CFR 304.1300 - Policy.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...: As defined by the Computer Security Act of 1987, any data/information, “the loss, misuse, or... Project Officer determines greater access controls are necessary, an OPDIV may protect and control...)]. (c) As part of the acquisition planning process, the Project Officer shall determine whether, based...

  4. 48 CFR 304.1300 - Policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...: As defined by the Computer Security Act of 1987, any data/information, “the loss, misuse, or... Project Officer determines greater access controls are necessary, an OPDIV may protect and control...)]. (c) As part of the acquisition planning process, the Project Officer shall determine whether, based...

  5. 48 CFR 304.1300 - Policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: As defined by the Computer Security Act of 1987, any data/information, “the loss, misuse, or... Project Officer determines greater access controls are necessary, an OPDIV may protect and control...)]. (c) As part of the acquisition planning process, the Project Officer shall determine whether, based...

  6. 48 CFR 304.1300 - Policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: As defined by the Computer Security Act of 1987, any data/information, “the loss, misuse, or... Project Officer determines greater access controls are necessary, an OPDIV may protect and control...)]. (c) As part of the acquisition planning process, the Project Officer shall determine whether, based...

  7. User's operating procedures. Volume 1: Scout project information programs

    NASA Technical Reports Server (NTRS)

    Harris, C. G.; Harris, D. K.

    1985-01-01

    A review of the user's operating procedures for the Scout Project Automatic Data System, called SPADS is given. SPADS is the result of the past seven years of software development on a Prime minicomputer located at the Scout Project Office. SPADS was developed as a single entry, multiple cross reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. The instructions to operate the Scout Project Information programs in data retrieval and file maintenance via the user friendly menu drivers is presented.

  8. 75 FR 55786 - Office of Special Education Programs, Office of Special Education and Rehabilitative Services...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-14

    ... DEPARTMENT OF EDUCATION Office of Special Education Programs, Office of Special Education and Rehabilitative Services, Department of Education; Notice of Final Extension of Project Period and Waiver for the... Transition Technical Assistance Center (NSTTAC). Currently, the Office of Special Education Programs (OSEP...

  9. [Psychiatric patients and relatives instruct German police officers - an anti-stigma project of "BASTA - the alliance for mentally ill people"].

    PubMed

    Wundsam, Kerstin; Pitschel-Walz, Gabi; Leucht, Stefan; Kissling, Werner

    2007-05-01

    Contact with police officers due to schizophrenia and resort to violence in such interactions is a common occurrence and represents a source for stigmatisation of mentally ill people. Aim of this project was to establish a program for police officers to reduce that stigma. The seminar was developed by a German anti-stigma organisation in cooperation with sociology teachers of the Bavarian police academy. Evaluations focussed on the police officers "social distance" and "negative stereotypes" towards mentally ill people. The personal contact between officers and the referees (patients, relatives, professionals) was the core of the seminar. Results of a debriefing after the pilot-project was overall positive. Evaluations in the renewal years showed significant improvement within the scale "social distance" (p < 0.0001) and amelioration in the stereotype-categories "violence" and "treatability". The need for special training of the police regarding mental illnesses was acknowledged by all participants. Personal contact of police officers with patients and relatives appeared to be important for the efficacy of this seminar and should become a main focus in similar anti-stigma interventions.

  10. Corrosion-Resistant Materials for Water and Wastewater Treatment Plants at Fort Bragg

    DTIC Science & Technology

    2007-06-01

    degradation, and assist in evaluating the Return on Investment for the project. The Project Manager was Dr. Ashok Kumar. The Associate Project Man- ager...Fort Bragg DPW Office), Steve Jackson (Instal- lation Management Agency – South East Region Office), Paul Volkman (Headquarters-Installation... Management Command), David Purcell, (Headquarters, Assistant Chief of Staff for Installation Management ), and Hilton Mills (Army Materiel Command), as

  11. The Inventive Thinking Curriculum Project. An Outreach Program of the United States Patent and Trademark Office. Third Edition.

    ERIC Educational Resources Information Center

    Department of Commerce, Washington, DC.

    The Inventive Thinking Curriculum Project is one of the many projects included in the national outreach program of the U.S. Patent and Trademark Office. It is designed to be used in conjunction with a thinking skills program as a means of applying critical and creative thinking and problem-solving skills through the activity of creating an…

  12. 78 FR 65695 - 30-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Correction, notice. SUMMARY: On October 25, 2013 at... Collection Title of Information Collection: Technical Processing Requirements for Multifamily Project...

  13. 5 CFR 890.1301 - Purpose.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... project will run for a period of three years. The legislation requires the Office of Personnel Management... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL... Demonstration Project § 890.1301 Purpose. The purpose of this subpart is to implement section 721 of the...

  14. 34 CFR 643.4 - What services may a project provide?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... involving elementary or secondary school teachers, faculty members at institutions of higher education....4 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION TALENT SEARCH General § 643.4 What services may a project...

  15. 18 CFR 153.8 - Required exhibits.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Office of Energy Projects, 888 First Street, NE., Washington, DC 20426; (6) Exhibit E-1. If the LNG... Technical Information Service or the Commission's Office of Energy Projects, 888 First Street, NE....8 Section 153.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION...

  16. 18 CFR 153.8 - Required exhibits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Office of Energy Projects, 888 First Street, NE., Washington, DC 20426; (6) Exhibit E-1. If the LNG... Technical Information Service or the Commission's Office of Energy Projects, 888 First Street, NE....8 Section 153.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION...

  17. 18 CFR 153.8 - Required exhibits.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Office of Energy Projects, 888 First Street, NE., Washington, DC 20426; (6) Exhibit E-1. If the LNG... Technical Information Service or the Commission's Office of Energy Projects, 888 First Street, NE....8 Section 153.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION...

  18. 18 CFR 153.8 - Required exhibits.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Office of Energy Projects, 888 First Street, NE., Washington, DC 20426; (6) Exhibit E-1. If the LNG... Technical Information Service or the Commission's Office of Energy Projects, 888 First Street, NE....8 Section 153.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION...

  19. 18 CFR 153.8 - Required exhibits.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Office of Energy Projects, 888 First Street, NE., Washington, DC 20426; (6) Exhibit E-1. If the LNG... Technical Information Service or the Commission's Office of Energy Projects, 888 First Street, NE....8 Section 153.8 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION...

  20. 44. Photographic copy of original construction drawing, dated August 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photographic copy of original construction drawing, dated August 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). PLANS AND SECTIONS OF VAULTS. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  1. 24 CFR 401.480 - Sale or transfer of project.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Development (Continued) OFFICE OF HOUSING AND OFFICE OF MULTIFAMILY HOUSING ASSISTANCE RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MULTIFAMILY HOUSING MORTGAGE AND HOUSING ASSISTANCE RESTRUCTURING PROGRAM (MARK-TO-MARKET) Restructuring Plan § 401.480 Sale or transfer of project. (a) May the owner...

  2. Support to 2nd Generation RLV Propulsion Project Office

    NASA Technical Reports Server (NTRS)

    Lee, Thomas J.

    2002-01-01

    In this final report regarding support to the second generation RLV (Reusable Launch Vehicle) propulsion project office, a list of tasks accomplished is presented. During this period, Lee & Associates, LLC participated in numerous Systems Requirements Reviews (SRR) related to the Cobra development program.

  3. Hyperspectral Technology Transfer to the US Department of Interior: Summary of Results of the NASA/DOI Hyperspectral Technology Transfer Project

    NASA Technical Reports Server (NTRS)

    Root, Ralph; Wickland, Diane

    2001-01-01

    In 1997 the Office of Biological Informatics and Outreach (OBIO), Biological Resources Division, US Geological Survey and NASA, Office of Earth Science (OES), initiated a coordinated effort for applying Airborne Visible and Infrared Imaging Spectrometer (AVIRIS) data and analysis, as a technology transfer project, to critical DOI environmental issues in four study sites throughout the United States. This work was accomplished by four US Department of the Interior (DOI) study teams with support from NASA/OES principal investigators and the Office of Earth Science programs. The studies, including personnel, objectives, background, project plans, and milestones were documented in a project website at . This report summarizes the final outcomes of the project, detailing accomplishments, lessons learned, and benefits realized to NASA, the US Geological Survey, and the participating DOI bureaus.

  4. 34 CFR 645.11 - What services do all Upward Bound projects provide?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... programs involving elementary or secondary school teachers, faculty members at institutions of higher....11 Section 645.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION UPWARD BOUND PROGRAM What Kinds of Projects...

  5. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  6. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  7. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  8. 48 CFR 2052.215-71 - Project officer authority.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... of the work description. (3) Review and, where required by the contract, approve technical reports... subject to the technical direction of the NRC project officer. The term technical direction is defined to include the following: (1) Technical direction to the contractor which shifts work emphasis between areas...

  9. Analysis of Florida Department Of Transportation Transit Corridor Program/Projects: Technical Memorandum Number Three - General Recommendations

    DOT National Transportation Integrated Search

    2001-03-01

    CUTR interviewed FDOT personnel at both the Central Office and Distict Offices and agency personnel to discuss the strengths and weaknesses of the overall Transit Corridor Program, including the results of specific projects, as well as the FDOT proce...

  10. 34 CFR 369.1 - What are the Vocational Rehabilitation Service Projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What are the Vocational Rehabilitation Service Projects? 369.1 Section 369.1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION VOCATIONAL...

  11. 34 CFR 272.10 - What types of projects may be funded?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ..., counselors, parents, community members, and other elementary or secondary school personnel to deal... 272.10 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND... Secretary may award funds to DACs for projects offering technical assistance (including training) to school...

  12. 34 CFR 272.10 - What types of projects may be funded?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., counselors, parents, community members, and other elementary or secondary school personnel to deal... 272.10 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND... Secretary may award funds to DACs for projects offering technical assistance (including training) to school...

  13. 34 CFR 271.10 - What types of projects may be funded?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... members, and other elementary or secondary school personnel to deal effectively with special educational... 271.10 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND... Secretary awards grants to SEAs for projects offering technical assistance (including training) to school...

  14. 34 CFR 271.10 - What types of projects may be funded?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... members, and other elementary or secondary school personnel to deal effectively with special educational... 271.10 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND... Secretary awards grants to SEAs for projects offering technical assistance (including training) to school...

  15. 34 CFR 637.13 - What are design projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What are design projects? 637.13 Section 637.13 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  16. 34 CFR 637.13 - What are design projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What are design projects? 637.13 Section 637.13 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  17. 34 CFR 637.12 - What are institutional projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What are institutional projects? 637.12 Section 637.12 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  18. 34 CFR 637.15 - What are cooperative projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What are cooperative projects? 637.15 Section 637.15 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  19. 34 CFR 637.13 - What are design projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What are design projects? 637.13 Section 637.13 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  20. 34 CFR 637.12 - What are institutional projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What are institutional projects? 637.12 Section 637.12 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  1. 34 CFR 637.12 - What are institutional projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What are institutional projects? 637.12 Section 637.12 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  2. 34 CFR 637.15 - What are cooperative projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What are cooperative projects? 637.15 Section 637.15 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  3. 34 CFR 637.15 - What are cooperative projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What are cooperative projects? 637.15 Section 637.15 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  4. 34 CFR 637.15 - What are cooperative projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What are cooperative projects? 637.15 Section 637.15 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  5. 34 CFR 637.12 - What are institutional projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What are institutional projects? 637.12 Section 637.12 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  6. 34 CFR 637.13 - What are design projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What are design projects? 637.13 Section 637.13 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  7. 34 CFR 637.15 - What are cooperative projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What are cooperative projects? 637.15 Section 637.15 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  8. 34 CFR 637.13 - What are design projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What are design projects? 637.13 Section 637.13 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT PROGRAM What Kinds of...

  9. 24 CFR 570.410 - Special Projects Program.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... (Continued) OFFICE OF ASSISTANT SECRETARY FOR COMMUNITY PLANNING AND DEVELOPMENT, DEPARTMENT OF HOUSING AND... sent to: Department of Housing and Urban Development, Office of Community Planning and Development, 451... 24 Housing and Urban Development 3 2010-04-01 2010-04-01 false Special Projects Program. 570.410...

  10. 76 FR 72929 - Agency Information Collection Activities: Proposed Collection; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-28

    ... proposed information collection project: ``Medical Office Survey on Patient Safety Culture Comparative... Medical Office Survey on Patient Safety Culture Comparative Database. The Agency for Healthcare Research... Patient Safety Culture (Medical Office SOPS) Comparative Database. The Medical Office SOPS Comparative...

  11. 77 FR 3787 - Notice of Submission of Proposed Information Collection to OMB; Office of Hospital Facilities...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ...The proposed information collection requirement described below has been submitted to the Office of Management and Budget (OMB) for review, as required by the Paperwork Reduction Act. The Department is soliciting public comments on the subject proposal. This information is collected from OHF staff, mortgagees, mortgagors, contractors and agents to manage and monitor the application, procedure, project administration and initial/final endorsement of projects undertaken by Office of Hospital Facilities.

  12. 17. Photocopy of original USRS photograph (from original print in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photocopy of original USRS photograph (from original print in the Umatilla Project History 1920, on file at National Archives, Rocky Mountain Region, Denver, Colorado) Photographer unknown, ca. 1920. Project office and employees - reading from left to right: Una H. Keck, Geo. C. Patterson, H.M. Schilling, Maurice D. Scroggs, Carl M. Voyen, Chas. Taylor, C.D. Porter - Former Umatilla Project Headquarters Buildings, Office, Hermiston, Umatilla County, OR

  13. Toward an expert project management system

    NASA Technical Reports Server (NTRS)

    Silverman, Barry G.; Murray, Arthur; Diakite, Coty; Feggos, Kostas

    1987-01-01

    The purpose of the research effort is to prescribe a generic reusable shell that any project office can install and customize for the purposes of advising, guiding, and supporting project managers in that office. The prescribed shell is intended to provide both: a component that generates prescriptive guidance for project planning and monitoring activities, and an analogy (intuition) component that generates descriptive insights of previous experience of successful project managers. The latter component is especially significant in that it has the potential to: retrieve insights, not just data, and provide a vehicle for expert PMs to easily transcribe their current experiences in the course of each new project managed.

  14. 34 CFR 390.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 2 2012-07-01 2012-07-01 false What types of projects are authorized under this program? 390.10 Section 390.10 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION REHABILITATION...

  15. 34 CFR 390.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 2 2013-07-01 2013-07-01 false What types of projects are authorized under this program? 390.10 Section 390.10 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION REHABILITATION...

  16. 34 CFR 390.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What types of projects are authorized under this program? 390.10 Section 390.10 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION REHABILITATION...

  17. 34 CFR 645.1 - What is the Upward Bound Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... participants the skills and motivation necessary to complete a program of secondary education and to enter and... the following three types of projects: (1) Regular Upward Bound projects. (2) Upward Bound Math and... Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY...

  18. 34 CFR 647.5 - How long is a project period?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false How long is a project period? 647.5 Section 647.5 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION RONALD E. MCNAIR POSTBACCALAUREATE ACHIEVEMENT PROGRAM General § 647.5...

  19. 78 FR 57623 - TRICARE Over-the-Counter Drug Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    ... DEPARTMENT OF DEFENSE Office of the Secretary TRICARE Over-the-Counter Drug Demonstration Project AGENCY: Office of the Secretary, DoD. ACTION: Notice of modification to the TRICARE Over-the-Counter Drug...) drugs to be included on the TRICARE uniform formulary. The Department has been engaged in a...

  20. 34 CFR 366.60 - What are the project evaluation standards?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What are the project evaluation standards? 366.60 Section 366.60 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION CENTERS FOR INDEPENDENT LIVING...

  1. 34 CFR 366.60 - What are the project evaluation standards?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true What are the project evaluation standards? 366.60 Section 366.60 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION CENTERS FOR INDEPENDENT LIVING...

  2. 34 CFR 643.4 - What services does a project provide?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... institutions of higher education, students, or any combination of these persons. (7) Programs and activities as....4 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION TALENT SEARCH General § 643.4 What services does a project...

  3. 78 FR 32406 - Submission for OMB Review; 30-Day Comment Request: Women's Health Initiative Observational Study

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-30

    ...; 30-Day Comment Request: Women's Health Initiative Observational Study SUMMARY: Under the provisions... proposed project contact: Shari Eason Ludlam, Project Officer, Women's Health Initiative Program Office... additional plans and instruments must be requested in writing. Proposed Collection: Women's Health Initiative...

  4. 34 CFR 379.44 - What are the requirements for a continuation award?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION PROJECTS WITH INDUSTRY...: (1) Congress must appropriate sufficient funds under the program. (2) Continuation of the project must be in the best interest of the Federal Government. (Approved by the Office of Management and...

  5. 43. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). NORTH ELEVATION (NORTH SIDE) AND WEST ELEVATION (WEST SIDE). - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  6. 42. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). EAST ELEVATION (EAST SIDE) AND SOUTH ELEVATION (SOUTH SIDE). - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  7. 75 FR 32494 - Energy Conservation for PHA-Owned or Leased Project-Audits, Utility Allowances

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ...-Owned or Leased Project-Audits, Utility Allowances AGENCY: Office of the Chief Information Officer, HUD... complete energy audits, benefit/cost analyses for individual vs. master metering. PHAs review tenant...-Audits, Utility Allowances. OMB Approval Number: 2577-0062. Form Numbers: HUD-50078. Description of the...

  8. 76 FR 53682 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-29

    ... approval from the Office of Management and Budget (OMB) for a generic clearance that will allow OPRE to... the following: Office of Management and Budget, Paperwork Reduction Project, Fax: 202-395- 6974, Attn... a variety of new research projects in the fields of cash welfare, employment and self-sufficiency...

  9. OCLC Office of Research Scholarly Service.

    ERIC Educational Resources Information Center

    Crook, Mark A.

    This report briefly describes the background, software, tools used, and future directions of the Scholarly Services project which began in 1987 in the OCLC Office of Research. Several selected projects are reviewed to illustrate how sample data are extracted from the OCLC Online Union Catalog to support scholars in their research endeavors. The…

  10. Support of US CLIVAR Project Office 2012

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cummings, Donna

    Director of JOSS, supervised the U.S. CLIVAR Project Office Director and helped direct the officer to enhance the goals and objectives of the U.S. CLIVAR Project and budget. Financial Manager of JOSS, worked to complete proposals and monitor compliance with award requirements and funding limitations and ensure the U.S. CLIVAR Project Office complied with UCAR policies and procedures. Project Coordinator administered the funding for the U.S. CLIVAR Project Office and was responsible for coordinating special projects that required additional support from JOSS technical staff. These projects included activities such as website updates, technology upgrades, production of printed reports, and developmentmore » of graphic elements like logos. Web Developer worked both on web development and graphic work and the work consisted of the following: Maintaining the site ? installing updates to Drupal CMS (Content Management System). Creating new templates for webpages and styling them with CSS and JavaScript/jQuery code. Fixing the styling on webpages that the content contributor/manager (Jenn Mays) created and has had trouble with. Creating new web forms for abstract uploading, subscriptions, and meeting registrations. Created 4 webpages for the ?ASP: Key Uncertainties in the Global Carbon-Cycle? meeting. Developed a document review form, instruction webpages, login redirect, dynamic table with form submissions for the US CLIVAR SSC Science Plan Document Review. This was open to the public from June 12, 2013 until July 10, 2013. During this time the user accounts had to be checked (daily) that were created by the public, to delete any spam ones. Graphics work: preparing images for general use on webpages, webpage banners, and for meeting name badges, creating a US CLIVAR letterhead, redesigning the US AMOC logo. System Administrator spent time working on the migration of the US CLIVAR site from the USGCRP office to UCAR here Boulder. This was done to increase the general speed of the site & to allow the web developer to work in it more efficiently. Main tasks were to Archive the old Site, create new development site for web developer, and move web address to new website when web developer was finished with development. There are no patients or equipment related to this proposals« less

  11. EHS and FME Lend Their Expertise to NCI Campus Refurbishment Project | Poster

    Cancer.gov

    In October 2015, the NCI executive officer and the director of NCI’s Office of Space and Facilities Management (OSFM) announced a wide-ranging refurbishment plan for NCI at Frederick. Since then, a project team comprising members from the Office of Scientific Operations, the Management Operations Support Branch, OSFM, the Center for Cancer Research, the Environment, Health, and Safety (EHS) directorate, and the Facilities Maintenance and Engineering (FME) directorate have met regularly with the laboratory groups affected by the refurbishment plan. Read more...

  12. Use Management Techniques in Office Practice

    ERIC Educational Resources Information Center

    Holehan, E. Lee

    1977-01-01

    Notes that authenticity can be added to student work projects in an office practice class by having the teacher assume the role of the office manager or supervisor and putting office management techniques into practice. Ways in which such techniques may be infused into classes are examined. (TA)

  13. LICENSING HYDROPOWER PROJECTS: Better Time and Cost Data Needed to Reach Informed Decisions About Process Reforms

    DTIC Science & Technology

    2001-05-01

    GAO United States General Accounting Office Report to Congressional Requesters May 2001 LICENSING HYDROPOWER PROJECTS Better Time and Cost Data...Dates Covered (from... to) ("DD MON YYYY") Title and Subtitle LICENSING HYDROPOWER PROJECTS: Better Time and Cost Data Needed to Reach Informed...Organization Name(s) and Address(es) General Accounting Office, PO Box 37050, Washington, DC 20013 Performing Organization Number(s) GAO-01-499

  14. 78 FR 22604 - Privacy Act of 1974, as Amended; System of Records

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-16

    ...: Chief-Office of Strategic Systems Management, Chief-Office of Quality, Chief-Office of Order Management & Delivery Systems, and Chief-Office of Portfolio & Project Management. Bureau of Engraving and Printing...; System of Records AGENCY: Bureau of Engraving and Printing, Treasury. ACTION: Notice of systems of...

  15. 78 FR 16502 - Proposed Agency Information Collection Activities; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ...: Board of Governors of the Federal Reserve System. SUMMARY: On June 15, 1984, the Office of Management... OMB Desk Officer, Shagufta Ahmed, Office of Information and Regulatory Affairs, Office of Management... Collection Report title: Annual Company-Run Stress Test Projections. Agency form number: FR Y-16. OMB control...

  16. 33 CFR 211.22 - Real estate Claims Officers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Real estate Claims Officers. 211..., DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Real Estate Claims § 211.22 Real estate Claims Officers. In each Division Office the Division...

  17. 33 CFR 211.22 - Real estate Claims Officers.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Real estate Claims Officers. 211..., DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Real Estate Claims § 211.22 Real estate Claims Officers. In each Division Office the Division...

  18. 33 CFR 211.22 - Real estate Claims Officers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Real estate Claims Officers. 211..., DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Real Estate Claims § 211.22 Real estate Claims Officers. In each Division Office the Division...

  19. 33 CFR 211.22 - Real estate Claims Officers.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Real estate Claims Officers. 211..., DEPARTMENT OF DEFENSE REAL ESTATE ACTIVITIES OF THE CORPS OF ENGINEERS IN CONNECTION WITH CIVIL WORKS PROJECTS Real Estate Claims § 211.22 Real estate Claims Officers. In each Division Office the Division...

  20. 77 FR 65395 - Notice of Submission of Proposed Information Collection to OMB: Section 8 Contract Renewal Policy...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... Project- Based Section 8 Contracts AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice... through the use of appropriate automated collection techniques or other forms of information technology, e... Section 8 project-based assistance contracts are renewed. The Section 8 contract renewal process is an...

  1. 34 CFR 390.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 2 2011-07-01 2010-07-01 true What types of projects are authorized under this program? 390.10 Section 390.10 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION REHABILITATION SHORT...

  2. 34 CFR 390.10 - What types of projects are authorized under this program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 2 2014-07-01 2013-07-01 true What types of projects are authorized under this program? 390.10 Section 390.10 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION REHABILITATION SHORT...

  3. 34 CFR 472.34 - Under what circumstances may a project continue if a partner withdraws?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false Under what circumstances may a project continue if a partner withdraws? 472.34 Section 472.34 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION NATIONAL WORKPLACE...

  4. 77 FR 65203 - Information Collection Request Sent to the Office of Management and Budget (OMB) for Approval...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-25

    ...-FF09E30000] Information Collection Request Sent to the Office of Management and Budget (OMB) for Approval; Wolf-Livestock Demonstration Project Grant Program AGENCY: Fish and Wildlife Service, Interior. ACTION... Number: 1018-XXXX. This is a new collection. Title: Wolf-Livestock Demonstration Project Grant Program...

  5. 24 CFR 990.280 - Project-based budgeting and accounting.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... company to manage a project, the PHA may use the difference between the property management fee paid to the private management company and the fee that is reasonable to fund operations of the central office... reasonable asset management fee that may also be used to fund operations of the central office. However, this...

  6. 18 CFR 5.14 - Formal study dispute resolution process.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... dispute, the panel shall make and deliver to the Director of the Office of Energy Projects a finding, with... from the date of filing of the notice of study dispute, the Director of the Office of Energy Projects... resolution process. 5.14 Section 5.14 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...

  7. 18 CFR 5.14 - Formal study dispute resolution process.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... dispute, the panel shall make and deliver to the Director of the Office of Energy Projects a finding, with... from the date of filing of the notice of study dispute, the Director of the Office of Energy Projects... resolution process. 5.14 Section 5.14 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...

  8. 18 CFR 5.14 - Formal study dispute resolution process.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... dispute, the panel shall make and deliver to the Director of the Office of Energy Projects a finding, with... from the date of filing of the notice of study dispute, the Director of the Office of Energy Projects... resolution process. 5.14 Section 5.14 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY...

  9. Concentrating Solar Power Projects - ISCC Ain Beni Mathar | Concentrating

    Science.gov Websites

    Location: Ain Beni Mathar (Ain Beni Mathar) Owner(s): ONE (Office National de l'Electricite) (100 Project Type: Commercial Participants Developer(s): Abener Owner(s) (%): ONE (Office National de l'Electricite) (100%) EPC Contractor: Abener Operator(s): Abengoa Solar / ONE Generation Offtaker(s): ONE

  10. 34 CFR 206.3 - Who is eligible to participate in a project?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false Who is eligible to participate in a project? 206.3 Section 206.3 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND SECONDARY EDUCATION, DEPARTMENT OF EDUCATION SPECIAL EDUCATIONAL PROGRAMS FOR STUDENTS WHOSE FAMILIES ARE...

  11. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What selection criteria does the Secretary use for the Demonstration Projects? 426.21 Section 426.21 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION COOPERATIVE...

  12. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What selection criteria does the Secretary use for the Demonstration Projects? 426.21 Section 426.21 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION COOPERATIVE...

  13. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What selection criteria does the Secretary use for the Demonstration Projects? 426.21 Section 426.21 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION COOPERATIVE...

  14. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What selection criteria does the Secretary use for the Demonstration Projects? 426.21 Section 426.21 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION COOPERATIVE...

  15. 34 CFR 426.21 - What selection criteria does the Secretary use for the Demonstration Projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What selection criteria does the Secretary use for the Demonstration Projects? 426.21 Section 426.21 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION COOPERATIVE...

  16. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What are the cost restrictions on design project grants? 637.41 Section 637.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  17. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What are the cost restrictions on design project grants? 637.41 Section 637.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  18. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What are the cost restrictions on design project grants? 637.41 Section 637.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  19. 34 CFR 637.11 - What kinds of projects are supported by this program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What kinds of projects are supported by this program? 637.11 Section 637.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  20. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What are the cost restrictions on design project grants? 637.41 Section 637.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  1. 34 CFR 637.11 - What kinds of projects are supported by this program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What kinds of projects are supported by this program? 637.11 Section 637.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  2. 34 CFR 637.41 - What are the cost restrictions on design project grants?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What are the cost restrictions on design project grants? 637.41 Section 637.41 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  3. 34 CFR 637.11 - What kinds of projects are supported by this program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What kinds of projects are supported by this program? 637.11 Section 637.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  4. 34 CFR 637.11 - What kinds of projects are supported by this program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What kinds of projects are supported by this program? 637.11 Section 637.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  5. 34 CFR 637.11 - What kinds of projects are supported by this program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What kinds of projects are supported by this program? 637.11 Section 637.11 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF POSTSECONDARY EDUCATION, DEPARTMENT OF EDUCATION MINORITY SCIENCE AND ENGINEERING IMPROVEMENT...

  6. 34 CFR 350.1 - What is the Disability and Rehabilitation Research Projects and Centers Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 2 2010-07-01 2010-07-01 false What is the Disability and Rehabilitation Research Projects and Centers Program? 350.1 Section 350.1 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF SPECIAL EDUCATION AND REHABILITATIVE SERVICES, DEPARTMENT OF EDUCATION...

  7. 34 CFR 200.86 - Use of MEP funds in schoolwide projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 1 2012-07-01 2012-07-01 false Use of MEP funds in schoolwide projects. 200.86 Section 200.86 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND SECONDARY EDUCATION, DEPARTMENT OF EDUCATION TITLE I-IMPROVING THE ACADEMIC ACHIEVEMENT OF THE DISADVANTAGED...

  8. 34 CFR 403.61 - What projects, services, and activities are permissible under the basic programs?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false What projects, services, and activities are permissible under the basic programs? 403.61 Section 403.61 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE...

  9. 34 CFR 403.61 - What projects, services, and activities are permissible under the basic programs?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false What projects, services, and activities are permissible under the basic programs? 403.61 Section 403.61 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE...

  10. 34 CFR 403.61 - What projects, services, and activities are permissible under the basic programs?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What projects, services, and activities are permissible under the basic programs? 403.61 Section 403.61 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE...

  11. 34 CFR 403.61 - What projects, services, and activities are permissible under the basic programs?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false What projects, services, and activities are permissible under the basic programs? 403.61 Section 403.61 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE...

  12. 34 CFR 403.61 - What projects, services, and activities are permissible under the basic programs?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false What projects, services, and activities are permissible under the basic programs? 403.61 Section 403.61 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION STATE...

  13. Annual Report 2008 -- Office of the Chief Financial Officer (OCFO)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fernandez, Jeffrey

    2008-12-22

    It is with great pleasure that I present to you the 2008 Chief Financial Officer's Annual Report. The data included in this report has been compiled from the Budget Office, the Controller, Procurement and Property Management and the Sponsored Projects Office. Also included are some financial comparisons with other DOE Laboratories and a glossary of commonly used acronyms.

  14. User's operating procedures. Volume 2: Scout project financial analysis program

    NASA Technical Reports Server (NTRS)

    Harris, C. G.; Haris, D. K.

    1985-01-01

    A review is presented of the user's operating procedures for the Scout Project Automatic Data system, called SPADS. SPADS is the result of the past seven years of software development on a Prime mini-computer located at the Scout Project Office, NASA Langley Research Center, Hampton, Virginia. SPADS was developed as a single entry, multiple cross-reference data management and information retrieval system for the automation of Project office tasks, including engineering, financial, managerial, and clerical support. This volume, two (2) of three (3), provides the instructions to operate the Scout Project Financial Analysis program in data retrieval and file maintenance via the user friendly menu drivers.

  15. The National Library of Medicine's Native American outreach portfolio: a descriptive overview*

    PubMed Central

    Wood, Frederick B.; Siegel, Elliot R.; Dutcher, Gale A.; Ruffin, Angela; Logan, Robert A.; Scott, John C.

    2005-01-01

    Objectives: This paper provides the most complete accounting of the National Library of Medicine's (NLM's) Native outreach since 1995, when there were only a few scattered projects. Method: The descriptive overview is based on a review of project reports, inventories, and databases and input from the NLM Specialized Information Services Division, National Network Office of the Library Operations Division, National Network of Libraries of Medicine, and Office of Health Information Programs Development of the Office of the NLM Director. The overview focuses on NLM-supported or sponsored outreach initiatives involving Native peoples: American Indians, Alaska Natives, and Native Hawaiians. Results: The review of NLM's relevant activities resulted in a portfolio of projects that clustered naturally into the following areas: major multisite projects: Tribal Connections and related, Native American Information Internship Project: Sacred Root, tribal college outreach and tribal librarianship projects, collaboration with inter-tribal and national organizations, participation in Native American Powwows, Native American Listening Circle Project, Native American Health Information, and other Native American outreach projects. Implications: NLM's Native American Outreach reached programmatic status as of late 2004. The companion paper identifies several areas of possible new or enhanced Native outreach activities. Both papers highlight the importance of solid reporting and evaluation to optimize project results and programmatic balance and priorities. PMID:16239955

  16. The National Library of Medicine's Native American outreach portfolio: a descriptive overview.

    PubMed

    Wood, Frederick B; Siegel, Elliot R; Dutcher, Gale A; Ruffin, Angela; Logan, Robert A; Scott, John C

    2005-10-01

    This paper provides the most complete accounting of the National Library of Medicine's (NLM's) Native outreach since 1995, when there were only a few scattered projects. The descriptive overview is based on a review of project reports, inventories, and databases and input from the NLM Specialized Information Services Division, National Network Office of the Library Operations Division, National Network of Libraries of Medicine, and Office of Health Information Programs Development of the Office of the NLM Director. The overview focuses on NLM-supported or sponsored outreach initiatives involving Native peoples: American Indians, Alaska Natives, and Native Hawaiians. The review of NLM's relevant activities resulted in a portfolio of projects that clustered naturally into the following areas: major multisite projects: Tribal Connections and related, Native American Information Internship Project: Sacred Root, tribal college outreach and tribal librarianship projects, collaboration with inter-tribal and national organizations, participation in Native American Powwows, Native American Listening Circle Project, Native American Health Information, and other Native American outreach projects. NLM's Native American Outreach reached programmatic status as of late 2004. The companion paper identifies several areas of possible new or enhanced Native outreach activities. Both papers highlight the importance of solid reporting and evaluation to optimize project results and programmatic balance and priorities.

  17. Programs and Projects of the Office of General Counsel (OGC)

    EPA Pesticide Factsheets

    The Office of General Counsel (OGC) attorneys work with EPA headquarters and regional offices to provide legal support for the issuance of permits, the approval of state environmental programs, and the initiation and litigation of enforcement actions.

  18. Compendium of Traffic Safety Research Projects 1985-2013.

    DOT National Transportation Integrated Search

    2014-01-01

    Through many name changes, from the Office of Program Development and Evaluation, the Office of Research and Evaluation, to the current, Office of Behavioral Safety Research, our focus has remained on improving the safety of drivers, occupants, pedes...

  19. 78 FR 64142 - 30-Day Notice of Proposed Information Collection: Condominium Project Approval Document Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-25

    ... INFORMATION CONTACT: Colette Pollard, Reports Management Officer, QDAM, Department of Housing and Urban... telephone 202-402-3400. Persons with hearing or speech impairments may access this number through TTY by..., Department Reports Management Officer, Office of the Chief Information Officer. [FR Doc. 2013-25193 Filed 10...

  20. Office of Interdisciplinary Health Studies Education, East Carolina university.

    PubMed

    Greer, Annette G; Clay, Maria C

    2010-01-01

    The Office of Interdisciplinary Health Sciences Education resides organizationally within East Carolina University (ECU), Division of Health Sciences; ECU established this office in 1999. The mission of the office is fivefold: 1. promote the expansion of interdisciplinary training within and between Health Sciences and other health-related programs on campus; 2. promote innovative research opportunities across disciplines, in particular, projects regarding interdisciplinary health sciences education; 3. serve as a clearinghouse for information relative to existing and planned interdisciplinary activities and projects within the Division; 4. collaborate with units, and communities in establishing community partnerships for interdisciplinary rural health training; and 5. identify core curricular content across health-related disciplines, minimizing curricular redundancy while promoting interdisciplinary collaboration.

  1. Project Management Series Case Study: The Office of Registration and Records

    ERIC Educational Resources Information Center

    Burgher, Karl E.; Snyder, Michael

    2012-01-01

    This is the third in a series of eight articles on project management (PM) in the academy. In this article, the authors describe the step-by-step implementation of a structural change to Indiana State University's (ISU's) Office of Registration and Records (ORR). The process described may vary as it is implemented elsewhere, but the authors…

  2. 8. Freight Warehouse, looking east into the east section. Projecting ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Freight Warehouse, looking east into the east section. Projecting into the warehouse space are: (a) A loading dock with slatted walls (b) An office space above it and (c) A toilet and utility area. (b) and (c) are accessed through the Ticket Office. - Curtis Wharf, Freight Warehouse, O & Second Streets, Anacortes, Skagit County, WA

  3. 34 CFR 403.172 - What special considerations must the State board give in approving projects, services, and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What special considerations must the State board give in approving projects, services, and activities? 403.172 Section 403.172 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF...

  4. 1982 Texas Competency Validation Project for Auto Mechanics, Diesel Mechanics, Office Occupations, Printshop Trades, and Welding. Final Report.

    ERIC Educational Resources Information Center

    Rogers, Sandra K.; Dahlberg, Maurine F.

    This report documents a statewide competency validation project to provide current information about job skills considered "important to know" by Texas industrial experts in the areas of auto mechanics, diesel mechanics, office occupations, print shop trades, and welding. Section 1 describes the steps used to conduct the study and…

  5. 48 CFR 652.236-72 - Statement of Qualifications for the Omnibus Diplomatic Security and Antiterrorism Act.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... contract will require the construction of a multi-story office building, the prospective bidder/offeror..., etc.) Complexity: (office building, etc.) Type of construction: Value of project: If the prospective... (P.L. 99-399; 22 U.S.C. 4852). The Act limits certain construction projects abroad to United States...

  6. 34 CFR 426.23 - What selection criteria does the Secretary use for the Community-Based Organization Projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 3 2010-07-01 2010-07-01 false What selection criteria does the Secretary use for the Community-Based Organization Projects? 426.23 Section 426.23 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION, DEPARTMENT OF EDUCATION...

  7. 2013 Building Technologies Office Program Peer Review Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none,

    2013-11-01

    The 2013 Building Technologies Office Program Peer Review Report summarizes the results of the 2013 Building Technologies Office (BTO) peer review, which was held in Washington, D.C., on April 2–4, 2013. The review was attended by over 300 participants and included presentations on 59 BTO-funded projects: 29 from BTO’s Emerging Technologies Program, 20 from the Commercial Buildings Integration Program, 6 from the Residential Buildings Integration Program, and 4 from the Building Energy Codes Program. This report summarizes the scores and comments provided by the independent reviewers for each project.

  8. Research and technology of the Lyndon B. Johnson Space Center

    NASA Technical Reports Server (NTRS)

    1988-01-01

    Johnson Space Center accomplishments in new and advanced concepts during 1987 are highlighted. Included are research projects funded by the Office of Aeronautics and Space Technology, Solar System Exploration and Life Sciences research funded by the Office of Space Sciences and Applications, and advanced Programs tasks funded by the Office of Space Flight. Summary sections describing the role of the Johnson Space Center in each program are followed by descriptions of significant projects. Descriptions are suitable for external consumption, free of technical jargon, and illustrated to increase ease of comprehension.

  9. Risk Management in EVA

    NASA Technical Reports Server (NTRS)

    Hall, Jonathan; Lutomski, M.

    2006-01-01

    This viewgraph presentation reviews the use of risk management in Extravehicular Activities (EVA). The contents include: 1) EVA Office at NASA - JSC; 2) EVA Project Risk Management: Why and When; 3) EVA Office Risk Management: How; 4) Criteria for Closing a Risk; 5) Criteria for Accepting a Risk; 6) ISS IRMA Reference Card Data Entry Requirement s; 7) XA/ EVA Office Risk Activity Summary; 8) EVA Significant Change Summary; 9) Integrated Risk Management Application (XA) Matrix, March 31, 2004; 10) ISS Watch Item: 50XX Summary Report; and 11) EVA Project RM Usefulness

  10. Transition Time: Zero

    NASA Technical Reports Server (NTRS)

    Cameron, W. Scott

    2004-01-01

    I had been in a technical/project management assignment about two years, when one day my boss asked me to come to his office to 'discuss an opportunity.' When I arrived in his office, he indicated that the project manager of one of our biggest ($10M+) and most important projects had requested to be removed from the job immediately, and the organization was going to grant the request. He felt I was the most experienced person he had and thought I would be a perfect fit for this job.

  11. Renovating Interior Office Space: What a Manager Needs To Consider.

    ERIC Educational Resources Information Center

    Babey, Evelyn R.

    When planning an office renovation, a manager should design an office layout that is efficient and should consider the psychological aspects of office design, including sound level, color harmony, and lighting. The manager must also have a good understanding of all phases of the project plan and the timing involved. There are basically five phases…

  12. Impact of Wet-Weather Peak Flow Blending on Disinfection and Treatment: A Case Study at Three Wastewater Treatment Plants

    EPA Science Inventory

    This research project was administered by the EPA Office of Research and Development and funded by Office of Water; Office of Policy, Economics and Innovation; and Office of Research and Development. Blending is the practice of diverting a part of peak wet-weather flows at wa...

  13. Case Studies of 19 School Resource Officer (SRO) Programs. Document Number 209271

    ERIC Educational Resources Information Center

    Finn, Peter; McDevitt, Jack; Lassiter, William; Shively, Michael; Rich, Tom

    2005-01-01

    There has been a growing interest in placing sworn law enforcement officers in schools as School Resource Officers (SROs) as a means of improving school safety and improving relations between police officers and youth. However, when this project began in May 2000, relatively little was known about SRO programs. The purpose of the National…

  14. An Introduction to ESERO-UK, the UK Space Education Office

    ERIC Educational Resources Information Center

    Clements, Allan; Mather, Edward

    2012-01-01

    This article introduces the UK branch of the European Space Education Resource Office (ESERO-UK), also known as the UK Space Education Office. It is a teaching project designed to use space to enthuse primary and secondary students to study science, technology, engineering and mathematics (STEM) subjects. The office is funded by the European Space…

  15. 43 CFR 422.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CLEO) means the highest level duly authorized law enforcement officer for a non-Department law enforcement agency. (f) Law Enforcement Officer means: (1) A duly authorized Federal law enforcement officer... LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.2 Definitions. (a) Department means...

  16. 34 CFR 472.33 - How must projects that serve adults with limited English proficiency provide for the needs of...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 34 Education 3 2011-07-01 2011-07-01 false How must projects that serve adults with limited English proficiency provide for the needs of those adults? 472.33 Section 472.33 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION...

  17. 34 CFR 472.33 - How must projects that serve adults with limited English proficiency provide for the needs of...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 34 Education 3 2013-07-01 2013-07-01 false How must projects that serve adults with limited English proficiency provide for the needs of those adults? 472.33 Section 472.33 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION...

  18. 34 CFR 472.33 - How must projects that serve adults with limited English proficiency provide for the needs of...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 34 Education 3 2012-07-01 2012-07-01 false How must projects that serve adults with limited English proficiency provide for the needs of those adults? 472.33 Section 472.33 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION...

  19. 34 CFR 472.33 - How must projects that serve adults with limited English proficiency provide for the needs of...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 34 Education 3 2014-07-01 2014-07-01 false How must projects that serve adults with limited English proficiency provide for the needs of those adults? 472.33 Section 472.33 Education Regulations of the Offices of the Department of Education (Continued) OFFICE OF VOCATIONAL AND ADULT EDUCATION...

  20. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Representative. Personnel who are FAC-P/PM certified, at any level, meet the requirements for FAC-COTR certification and are, therefore, not required to obtain FAC-COTR certification to serve as a COTR for an HHS acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  1. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Representative. Personnel who are FAC-P/PM certified, at any level, meet the requirements for FAC-COTR certification and are, therefore, not required to obtain FAC-COTR certification to serve as a COTR for an HHS acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  2. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Representative. Personnel who are FAC-P/PM certified, at any level, meet the requirements for FAC-COTR certification and are, therefore, not required to obtain FAC-COTR certification to serve as a COTR for an HHS acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  3. 48 CFR 301.607-78 - Contracting Officer designation of a Program/Project Manager as the Contracting Officer's...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Representative. Personnel who are FAC-P/PM certified, at any level, meet the requirements for FAC-COTR certification and are, therefore, not required to obtain FAC-COTR certification to serve as a COTR for an HHS acquisition. However, for those individuals serving as a Program or Project Manager under a FAC-P/PM...

  4. 5 CFR 470.305 - Submission of proposals for demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... projects. 470.305 Section 470.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.305 Submission of proposals for demonstration projects. (a) OPM...

  5. 24 CFR 401.474 - Project accounts.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...) OFFICE OF HOUSING AND OFFICE OF MULTIFAMILY HOUSING ASSISTANCE RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MULTIFAMILY HOUSING MORTGAGE AND HOUSING ASSISTANCE RESTRUCTURING PROGRAM (MARK-TO...

  6. 76 FR 69238 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-08

    ... submitted to the Office of Management and Budget (OMB) for clearance the following proposal for collection... Sustainable Broadband Adoption). Each PPR provides updates on fundamental project milestones and key..., 2011. Gwellnar Banks, Management Analyst, Office of the Chief Information Officer. [FR Doc. 2011-28776...

  7. 36 CFR 218.3 - Reviewing officer.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Agriculture or Under Secretary, Natural Resources and Environment is the reviewing officer. (b) The reviewing... Section 218.3 Parks, Forests, and Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PROJECT-LEVEL... officer is the U.S. Department of Agriculture (USDA) or Forest Service official having the delegated...

  8. 78 FR 64467 - Submission for OMB Review; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ... and Nutrition Service (FNS) annually for approval a Budget Projection Statement (FNS-366A), which... Officer for Agriculture, Office of Information and Regulatory Affairs, Office of Management and Budget... number. Food and Nutrition Service Title: Operating Guidelines, Forms and Waivers. OMB Control Number...

  9. 75 FR 9247 - Multifamily Default Status Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ... Report AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: The proposed... comments on the subject proposal. Mortgagees use this report to notify HUD that a project owner has... INFORMATION CONTACT: Leroy McKinney Jr., Reports Management Officer, QDAM, Department of Housing and Urban...

  10. 76 FR 80907 - TRICARE Prime Urgent Care Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... DEPARTMENT OF DEFENSE Office of the Secretary TRICARE Prime Urgent Care Demonstration Project....S. Code, section 1092, entitled Department Of Defense TRICARE Prime Urgent Care Demonstration Project. The demonstration project is intended to test whether allowing four visits to an urgent care...

  11. SP-100, a project manager's view

    NASA Technical Reports Server (NTRS)

    Truscello, Vincent C.

    1983-01-01

    Born to meet the special needs of America's space effort, the SP-100 Program testifies to the cooperation among government agencies. The Department of Energy (DOE), the National Aeronautics and Space Administration (NASA), and the Defense Advanced Research Projects Agency (DARPA) are working together to produce a 100-kW power system for use in outer space. At this point in the effort, it is appropriate to review: The approach to meet program goals; the status of activities of the Project Office, managed by the Jet Propulsion Laboratory (JPL); and, because this is a meeting on materials, answers beings developed by the Project Office to vital questions on refractory alloy technology.

  12. US Department of Energy Grand Junction Projects Office Remedial Action Project, final report of the decontamination and decommissioning of Building 36 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also is the remedial action contractor. Building 36more » was found to be radiologically contaminated and was demolished in 1996. The soil beneath the building was remediated in accordance with identified standards and can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  13. US Climate Variability and Predictability Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patterson, Mike

    The US CLIVAR Project Office administers the US CLIVAR Program with its mission to advance understanding and prediction of climate variability and change across timescales with an emphasis on the role of the ocean and its interaction with other elements of the Earth system. The Project Office promotes and facilitates scientific collaboration within the US and international climate and Earth science communities, addressing priority topics from subseasonal to centennial climate variability and change; the global energy imbalance; the ocean’s role in climate, water, and carbon cycles; climate and weather extremes; and polar climate changes. This project provides essential one-year supportmore » of the Project Office, enabling the participation of US scientists in the meetings of the US CLIVAR bodies that guide scientific planning and implementation, including the scientific steering committee that establishes program goals and evaluates progress of activities to address them, the science team of funded investigators studying the ocean overturning circulation in the Atlantic, and two working groups tackling the priority research topics of Arctic change influence on midlatitude climate and weather extremes and the decadal-scale widening of the tropical belt.« less

  14. US Climate Variability and Predictability (CLIVAR) Project- Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Patterson, Mike

    The US CLIVAR Project Office administers the US CLIVAR Program with its mission to advance understanding and prediction of climate variability and change across timescales with an emphasis on the role of the ocean and its interaction with other elements of the Earth system. The Project Office promotes and facilitates scientific collaboration within the US and international climate and Earth science communities, addressing priority topics from subseasonal to centennial climate variability and change; the global energy imbalance; the ocean’s role in climate, water, and carbon cycles; climate and weather extremes; and polar climate changes. This project provides essential one-year supportmore » of the Project Office, enabling the participation of US scientists in the meetings of the US CLIVAR bodies that guide scientific planning and implementation, including the scientific steering committee that establishes program goals and evaluates progress of activities to address them, the science team of funded investigators studying the ocean overturning circulation in the Atlantic, and two working groups tackling the priority research topics of Arctic change influence on midlatitude climate and weather extremes and the decadal-scale widening of the tropical belt.« less

  15. 77 FR 33446 - Jordan Cove Energy Project, L.P.; Application for Long-Term Authorization to Export Liquefied...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-06

    ... Resources to Non-Free Trade Agreement Countries for a 25-Year Period AGENCY: Office of Fossil Energy, DOE. ACTION: Notice of application. SUMMARY: The Office of Fossil Energy (FE) of the Department of Energy (DOE... Mail: U.S. Department of Energy (FE-34), Office of Natural Gas Regulatory Activities, Office of Fossil...

  16. Office Space: How Will Technology Affect the Education Office Environment?

    ERIC Educational Resources Information Center

    Day, C. William

    2009-01-01

    The office environment 10 years from now will be different from the one today. More office personnel will be organized around processes rather than functions. More work activities will be done by teams rather than individuals, and those teams will change over time, as will the nature of the work projects and the people who constitute the team. The…

  17. Modeling of Core Competencies in the Registrar's Office

    ERIC Educational Resources Information Center

    Pikowsky, Reta

    2009-01-01

    The Office of the Registrar at the Georgia Institute of Technology, in cooperation with the Office of Human Resources, has been engaged since February 2008 in a pilot project to model core competencies for the leadership team and the staff. It is the hope of the office of Human resources that this pilot will result in a model that can be used…

  18. 34 CFR 222.141 - For what types of projects may the Secretary provide assistance under section 8008 of the Act?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 34 Education 1 2010-07-01 2010-07-01 false For what types of projects may the Secretary provide assistance under section 8008 of the Act? 222.141 Section 222.141 Education Regulations of the Offices of the Department of Education OFFICE OF ELEMENTARY AND SECONDARY EDUCATION, DEPARTMENT OF EDUCATION IMPACT AID...

  19. TRU waste lead organization -- WIPP Project Office Interface Management semi-annual report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guerrero, J.V.; Gorton, J.M.

    1985-05-01

    The Charter establishing the Interface Control Board and the administrative organization to manage the interface of the TRU Waste Lead Organization and the WIPP Project Office also requires preparation of a summary report describing significant interface activities.'' This report includes a discussion of Interface Working Group (IWG) recommendations and resolutions considered and implemented'' over the reporting period October 1984 to March 1985.

  20. Development and Pilot Test of a Career-Oriented, Peer-Instructional Model in the Office Cluster of Business Occupations. Final Report.

    ERIC Educational Resources Information Center

    Hungerland, Jacklyn; And Others

    This project was conducted to design an instructional model capable of producing high levels of student motivation and proficiency, using the office cluster of business occupations as a vehicle, and to formulate a plan for field implementation and evaluation of the model. To achieve the objectives, project personnel, secondary business teachers,…

  1. 24 CFR 401.480 - Sale or transfer of project.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Development (Continued) OFFICE OF HOUSING AND OFFICE OF MULTIFAMILY HOUSING ASSISTANCE RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MULTIFAMILY HOUSING MORTGAGE AND HOUSING ASSISTANCE RESTRUCTURING...

  2. 24 CFR 401.480 - Sale or transfer of project.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Development (Continued) OFFICE OF HOUSING AND OFFICE OF MULTIFAMILY HOUSING ASSISTANCE RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MULTIFAMILY HOUSING MORTGAGE AND HOUSING ASSISTANCE RESTRUCTURING...

  3. 24 CFR 401.480 - Sale or transfer of project.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Development (Continued) OFFICE OF HOUSING AND OFFICE OF MULTIFAMILY HOUSING ASSISTANCE RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MULTIFAMILY HOUSING MORTGAGE AND HOUSING ASSISTANCE RESTRUCTURING...

  4. View of front (north) and east walls of the Office, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    View of front (north) and east walls of the Office, Childs power plant. Rock cairn in front frames the 1976 National Historic Mechanical Engineering plaque. Looking southeast - Childs-Irving Hydroelectric Project, Childs System, Office, Forest Service Road 708/502, Camp Verde, Yavapai County, AZ

  5. External Research in AISD: Knowledge for Building, 1982-83.

    ERIC Educational Resources Information Center

    Austin Independent School District, TX. Office of Research and Evaluation.

    The Austin Independent School District (AISD) Office of Research and Development, presents abstracts of research projects conducted by external agencies or individuals within AISD. For 33 projects, this report contains the AISD project number, project title, project director, project sponsor, schools where conducted, and whether or not a full…

  6. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bachrach, A.; Hoopes, J.; Morycz, D.

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. Themore » US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.« less

  7. A Virtual Collaborative Environment for Mars Surveyor Landing Site Studies

    NASA Technical Reports Server (NTRS)

    Gulick, V.C.; Deardorff, D. G.; Briggs, G. A.; Hand, K. P.; Sandstrom, T. A.

    1999-01-01

    Over the past year and a half, the Center for Mars Exploration (CMEX) at NASA Ames Research Center (ARC) has been working with the Mars Surveyor Project Office at JPL to promote interactions among the planetary community and to coordinate landing site activities for the Mars Surveyor Project Office. To date, CMEX has been responsible for organizing the first two Mars Surveyor Landing Site workshops, web-archiving resulting information from these workshops, aiding in science evaluations of candidate landing sites, and serving as a liaison between the community and the Project. Most recently, CMEX has also been working with information technologists at Ames to develop a state-of-the-art collaborative web site environment to foster interaction of interested members of the planetary community with the Mars Surveyor Program and the Project Office. The web site will continue to evolve over the next several years as new tools and features are added to support the ongoing Mars Surveyor missions.

  8. 78 FR 36564 - 30-Day Notice of Proposed Information Collection: Delegated Processing for Certain 202 Supportive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-18

    ... Information Collection: Delegated Processing for Certain 202 Supportive Housing for the Elderly Projects AGENCY: Office of the Chief Information Officer, HUD. ACTION: Notice. SUMMARY: HUD has submitted the proposed information collection requirement described below to the Office of Management and Budget (OMB...

  9. Results of Workshops on Privacy Protection Technologies

    NASA Astrophysics Data System (ADS)

    Landwehr, Carl

    This talk summarizes the results of a series of workshops on privacy protecting technologies convened in the fall of 2006 by the Office of the Director of National Intelligence through its Civil Liberties Protection Office and the (then) Disruptive Technology Office (now part of the Intelligence Advanced Research Projects Activity, IARPA).

  10. Gulf of Mexico Hypoxia Research Program Data Report 2002-2007

    EPA Science Inventory

    The work described in this report summarizes the data collected during 12 oceanographic cruises conducted from 2002-2007. The project was supported by the US EPA Office of Research and Development, in partnership with the US EPA Gulf of Mexico Program Office, the Office of Water,...

  11. 77 FR 11539 - Agency Forms Undergoing Paperwork Reduction Act Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... (CDC) publishes a list of information collection requests under review by the Office of Management and... . Send written comments to CDC Desk Officer, Office of Management and Budget, Washington, DC 20503 or by... Project Evaluation of Dating Matters: Strategies to Promote Healthy Teen Relationships\\TM\\--New--National...

  12. 78 FR 9729 - Proposed Information Collection; Comment Request: NPS Institutional Animal Care and Use Committee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ... Park Service) have submitted to the Office of Management and Budget (OMB) the information collection...), and the Interagency Research Animal Committee (IRAC) principles for projects involving the use of... of Management and Budget (OMB) Office of Information and Regulatory Affairs, Attention: Desk Officer...

  13. 75 FR 51272 - Proposed Collection; Comment Request; STAR METRICS-Science and Technology in America's...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-19

    ... data collection projects, the Office of Science Policy Analysis (OSPA), the National Institutes of..., Health Science Policy Analyst, Office of Science and Technology Policy, OSP, OD; NIH, Building 1, Room... this publication. Dated: August 12, 2010. Lynn D. Hudson, Director, Office of Science Policy Analysis...

  14. 7 CFR 2.97 - Director, Office of the Executive Secretariat.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... and related records management functions for the Office of the Secretary. (2) Provide administrative, editorial, and project management support services to the Immediate Office of the Secretary. (b) [Reserved] ... to § 2.24(a)(10), and with due deference for delegations to other Departmental Management officials...

  15. 7 CFR 2.97 - Director, Office of the Executive Secretariat.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... and related records management functions for the Office of the Secretary. (2) Provide administrative, editorial, and project management support services to the Immediate Office of the Secretary. (b) [Reserved] ... to § 2.24(a)(10), and with due deference for delegations to other Departmental Management officials...

  16. 7 CFR 2.97 - Director, Office of the Executive Secretariat.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... and related records management functions for the Office of the Secretary. (2) Provide administrative, editorial, and project management support services to the Immediate Office of the Secretary. (b) [Reserved] ... to § 2.24(a)(10), and with due deference for delegations to other Departmental Management officials...

  17. 7 CFR 2.97 - Director, Office of the Executive Secretariat.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... and related records management functions for the Office of the Secretary. (2) Provide administrative, editorial, and project management support services to the Immediate Office of the Secretary. (b) [Reserved] ... to § 2.24(a)(10), and with due deference for delegations to other Departmental Management officials...

  18. 77 FR 36998 - Notice of Availability of a Draft Programmatic Environmental Assessment for Office of Coast...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... Draft Programmatic Environmental Assessment for Office of Coast Survey Hydrographic Survey Projects... Programmatic Environmental Assessment; Request for comments. SUMMARY: NOAA's Office of Coast Survey (OCS) seeks comment on a draft programmatic environmental assessment (PEA) of the hydrographic surveys and related...

  19. 13 CFR 305.12 - Project sign.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ....12 Business Credit and Assistance ECONOMIC DEVELOPMENT ADMINISTRATION, DEPARTMENT OF COMMERCE PUBLIC WORKS AND ECONOMIC DEVELOPMENT INVESTMENTS Requirements for Approved Projects § 305.12 Project sign. The... the Federal government is participating in the Project. The EDA regional office will provide mandatory...

  20. 76 FR 6121 - Information Collection; Submission for OMB Review, Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-03

    ... used by NCCC projects and partnerships office to collect project performance data. Type of Review: New... year. Assuming the distribution of project types remains constant, the number of survey sections...

  1. Cradle Enhanced UI Development

    NASA Technical Reports Server (NTRS)

    Jentsch, Samuel

    2016-01-01

    This summer I have been working in the EDI (Exploration, Development, and Integration) office. The primary goal of my office is to facilitate the integration, cooperation, and communication between programs, projects and departments throughout the agency. The majority of my efforts has been focused on Cradle, a requirements management and systems engineering tool. This tool is utilized by teams throughout NASA to plan and track the development of a variety of ongoing projects.

  2. [Earth Science Technology Office's Computational Technologies Project

    NASA Technical Reports Server (NTRS)

    Fischer, James (Technical Monitor); Merkey, Phillip

    2005-01-01

    This grant supported the effort to characterize the problem domain of the Earth Science Technology Office's Computational Technologies Project, to engage the Beowulf Cluster Computing Community as well as the High Performance Computing Research Community so that we can predict the applicability of said technologies to the scientific community represented by the CT project and formulate long term strategies to provide the computational resources necessary to attain the anticipated scientific objectives of the CT project. Specifically, the goal of the evaluation effort is to use the information gathered over the course of the Round-3 investigations to quantify the trends in scientific expectations, the algorithmic requirements and capabilities of high-performance computers to satisfy this anticipated need.

  3. Laboratory Directed Research and Development Program FY2011

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    none, none

    2012-04-27

    Berkeley Lab's research and the Laboratory Directed Research and Development (LDRD) program support DOE's Strategic Themes that are codified in DOE's 2006 Strategic Plan (DOE/CF-0010), with a primary focus on Scientific Discovery and Innovation. For that strategic theme, the Fiscal Year (FY) 2011 LDRD projects support each one of the three goals through multiple strategies described in the plan. In addition, LDRD efforts support the four goals of Energy Security, the two goals of Environmental Responsibility, and Nuclear Security (unclassified fundamental research that supports stockpile safety and nonproliferation programs). Going forward in FY 2012, the LDRD program also supports themore » Goals codified in the new DOE Strategic Plan of May, 2011. The LDRD program also supports Office of Science strategic plans, including the 20-year Scientific Facilities Plan and the Office of Science Strategic Plan. The research also supports the strategic directions periodically under consideration and review by the Office of Science Program Offices, such as LDRD projects germane to new research facility concepts and new fundamental science directions. Brief summares of projects and accomplishments for the period for each division are included.« less

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shoaf, C.R.; Guth, D.J.

    The Air Risk Information Support Center (Air RISC) was initiated in early 1988 by the US Environmental Protection Agency`s (EPA) Office of Health and Environmental Assessment (OHEA) and the Office of Air Quality Planning and Standards (OAQPS) as a technology transfer effort that would focus on providing information to state and local environmental agencies and to EPA Regional Offices in the areas of health, risk, and exposure assessment for toxic air pollutants. Technical information is fostered and disseminated by Air RISCs three primary activities: (1) a {open_quotes}hotline{close_quotes}, (2) quick turn-around technical assistance projects, and (3) general technical guidance projects. 1more » ref., 2 figs.« less

  5. Bilingual Vocational Education. Project Abstracts 1987-1988.

    ERIC Educational Resources Information Center

    Office of Vocational and Adult Education (ED), Washington, DC.

    Abstracts are provided for 16 bilingual vocational education projects offered in 1987-88. Each abstract provides information on: grantee; state; project title; project director, address, and telephone number; project officer and U.S. Department of Education address; language group(s) served; occupational skills area(s); length of training cycle…

  6. General setting from alley, office to left, concrete structure in ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    General setting from alley, office to left, concrete structure in center foreground, garage/shop to right, view to northeast - Former Umatilla Project Headquarters Buildings, Hermiston, Umatilla County, OR

  7. 48 CFR 48.001 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... Contracting office includes any contracting office that the acquisition is transferred to, such as another... projected learning or changes in quantity during the sharing period. It is calculated at the time the VECP...

  8. 50 CFR 21.4 - Information collection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to the Service Information Collection Control Officer, MS-222 ARLSQ, U.S. Fish and Wildlife Service, Washington, DC 20240, or the Office of Management and Budget, Paperwork Reduction Project (1018-0022...

  9. 10 CFR 1049.9 - Firearms and firearms incidents.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... immediately, and to the SPR Project Management Office Security Division within 24 hours. The Strategic... FORCE OFFICERS OF THE STRATEGIC PETROLEUM RESERVE § 1049.9 Firearms and firearms incidents. (a...

  10. 10 CFR 1049.9 - Firearms and firearms incidents.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... immediately, and to the SPR Project Management Office Security Division within 24 hours. The Strategic... FORCE OFFICERS OF THE STRATEGIC PETROLEUM RESERVE § 1049.9 Firearms and firearms incidents. (a...

  11. 5 CFR 470.303 - Eligible parties.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.303... demonstration projects under 5 U.S.C. 4701(a)(1) and 4701(b) may conduct demonstration projects after approval...

  12. 76 FR 12717 - Disability and Rehabilitation Research Projects and Centers Program; Field Initiated (FI...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... DEPARTMENT OF EDUCATION Disability and Rehabilitation Research Projects and Centers Program; Field...; National Institute on Disability and Rehabilitation Research (NIDRR)--Disability and Rehabilitation Research Projects and Centers Program--Field Initiated (FI) Projects AGENCY: Office of Special Education...

  13. 2015 Peer Review Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    In the spring and summer of 2015, the Bioenergy Technologies Office (BETO or the Office) of the U.S. Department of Energy (DOE) implemented an external peer review of the projects in its research, development and demonstration (RD&D) portfolio. The Office manages a diverse portfolio of technologies across the spectrum of applied RD&D within the dynamic context of changing budgets and Administration priorities. The Office portfolio is organized according to the biomass-to-bioenergy supply chain—from the feedstock source to the end user (see Figure 1)—with major focus on feedstock supply and biomass conversion. The 2015 Project Peer Review took place March 23-27,more » 2015, outside of Washington, D.C., in Alexandria, Virginia, and evaluated most of the publicly funded projects in BETO’s portfolio. The subsequent Program Management Review took place on June 25, 2015, in Washington, D.C., and provided an Office- level assessment of strategic planning and programmatic initiatives. The peer review process enables external stakeholders to provide feedback on the responsible use of taxpayer funding and develop recommendations for the most efficient and effective ways to accelerate the development of an advanced bioenergy industry. The planning and execution of these reviews was completed over the course of 10 months, and this report includes the results of both events.« less

  14. KSC-2012-1547

    NASA Image and Video Library

    2012-02-23

    ORLANDO, Fla. -- Representatives from NASA’s Glenn Research Center, located in Cleveland, provide information on their center’s programs and projects to participants in NASA’s Project Management Challenge 2012. PM Challenge 2012 was held at the Caribe Royale Hotel and Convention Center in Orlando, Fla., on February 22-23, to provide a forum for all stakeholders in the project management community to meet and share stories, lessons learned and new uses of technology in the industry. The PM Challenge is sponsored by NASA's Office of the Chief Engineer. For additional information, visit http://www.nasa.gov/offices/oce/pmchallenge/index.html. Photo credit: NASA/Jim Grossmann

  15. KSC-2012-1548

    NASA Image and Video Library

    2012-02-23

    ORLANDO, Fla. -- Representatives from NASA’s Wallops Flight Facility, located in Virginia, provide information on their center’s programs and projects to participants in NASA’s Project Management Challenge 2012. PM Challenge 2012 was held at the Caribe Royale Hotel and Convention Center in Orlando, Fla., on February 22-23, to provide a forum for all stakeholders in the project management community to meet and share stories, lessons learned and new uses of technology in the industry. The PM Challenge is sponsored by NASA's Office of the Chief Engineer. For additional information, visit http://www.nasa.gov/offices/oce/pmchallenge/index.html. Photo credit: NASA/Jim Grossmann

  16. Sustainable Energy in Remote Indonesian Grids. Accelerating Project Development

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hirsch, Brian; Burman, Kari; Davidson, Carolyn

    2015-06-30

    Sustainable Energy for Remote Indonesian Grids (SERIG) is a U.S. Department of Energy (DOE) funded initiative to support Indonesia’s efforts to develop clean energy and increase access to electricity in remote locations throughout the country. With DOE support, the SERIG implementation team consists of the National Renewable Energy Laboratory (NREL) and Winrock International’s Jakarta, Indonesia office. Through technical assistance that includes techno-economic feasibility evaluation for selected projects, government-to-government coordination, infrastructure assessment, stakeholder outreach, and policy analysis, SERIG seeks to provide opportunities for individual project development and a collective framework for national replication office.

  17. Racial Differences in Resolving Conflicts: A Comparison between Black and White Police Officers

    ERIC Educational Resources Information Center

    Sun, Ivan Y.; Payne, Brian K.

    2004-01-01

    This study examined the behavioral differences between Black and White police officers in handling interpersonal conflicts. Observational and survey data from the Project on Policing Neighborhoods and the 1990 census data were used. Actions taken by officers are examined along two behavioral dimensions: coercion and support. Findings show that…

  18. At Home in the Office. A Guide for the Home Worker.

    ERIC Educational Resources Information Center

    Thomas, Neil; And Others

    This guide provides information to persons interested in establishing a work-at-home program, specifically those in clerical or support staff positions who use modern automated office equipment. The text is divided into two sections. The Home Worker section provides a summary of the At Home in the Office Project, personality characteristics…

  19. 78 FR 25258 - Notice of Availability (NOA) for Sharpe Permit Relinquishment Project Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-30

    ..., California 95440 and at the Defense Distribution Depot San Joaquin--Tracy Site Public Affairs Office, 2600 S... Distribution Depot San Joaquin--Tracy Site Public Affairs Office at (209) 839-4226. ADDRESSES: You may submit..., VA 22350- 3100. FOR FURTHER INFORMATION CONTACT: Public Affairs Office, Tracy, California, (209) 839...

  20. 75 FR 55585 - Proposed Collection; Comment Request; Generic Clearance for Surveys of Customers and Partners of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-13

    ... Request; Generic Clearance for Surveys of Customers and Partners of the Office of Extramural Research of... collection projects, the Office of Extramural Research (OER), the National Institutes of Health (NIH) will... and Partners of the Office of Extramural Research of the National Institutes of Health. Type of...

  1. Manning Army Equal Opportunity Officer Positions

    DTIC Science & Technology

    2013-03-01

    equality , and other social dynamics. This long overdue initiative identified organizational and cultural impediments that had essentially prevented...Manning Army Equal Opportunity Officer Positions by Colonel Angela M. Odom United States Army...TYPE STRATEGY RESEARCH PROJECT .33 3. DATES COVERED (From - To) 4. TITLE AND SUBTITLE Manning Army Equal Opportunity Officer Positions 5a

  2. A Planning Study to Determine the Feasibility of Developing a New Business and Office Education Curriculum. Moonshot--An Office Occupation Curriculum. Final Report.

    ERIC Educational Resources Information Center

    Lanham, Frank W.

    The purpose of this study was to explore the feasibility of utilizing the systems approach in developing an office occupations curriculum congruent with the concepts in the organic curriculum theory. The title of this project is New Office and Business Education Learning System (NOBELS). An analog system model was developed as the framework in…

  3. The Feasibility of Instituting a Department Head Screen in the Naval Special Warfare Community.

    DTIC Science & Technology

    1985-12-01

    community, and through use of the Structured Accession Planning System for Officers (STRAP-O) model, projects the community from 1985 to 1991 both with and...Placement Officer. It looks at the current state of the NSW community, and through use of the Structured Accession Planning System for Officers (STRAP-0...ACCESSION PLANNING SYSTEM FOR OFFICERS----------------------------------------19 Ill. NAVAL SPECIAL WARFARE COMMUNITY RESPONSE TO PROPOSAL

  4. 50 CFR 22.4 - Information collection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Information Collection Control Officer, MS-222 ARLSQ, U.S. Fish and Wildlife Service, Washington, DC 20240, or the Office of Management and Budget, Paperwork Reduction Project (1018-0022 and 1018-0136), Washington...

  5. Notification: Evaluation of Laboratory Equipment Utilization

    EPA Pesticide Factsheets

    Project #OPE-FY14-0024, April 08, 2014. The Office of Inspector General plans to begin preliminary research on equipment utilization within the U.S. Environmental Protection Agency Office of Research and Development.

  6. Photos | NOAA Gulf Spill Restoration

    Science.gov Websites

    Projects Near You Strategic Frameworks Monitoring and Adaptive Management Restoration Areas Alabama Florida Restoration Menu Home Restoration Areas About Us Data How We Restore Media & News NOAA Offices Office of

  7. US Department of Energy Grand Junction Projects Office Remedial Action Project. Final report of the decontamination and decommissioning of Building 52 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krabacher, J.E.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7-acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the GJPO Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, also was the remedial action contractor. Building 52more » was found to be radiologically contaminated and was demolished in 1994. The soil area within the footprint of the building has been remediated in accordance with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  8. 75 FR 77379 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ... Personnel Management Demonstration Project, Department of Navy, Office of Naval Research; Notice #0;#0..., authorizes the Secretary of Defense (SECDEF) to conduct personnel management demonstration projects at... to execute a process and plan to employ the Department's personnel management demonstration project...

  9. National Workplace Literacy Program. 1993 Abstracts.

    ERIC Educational Resources Information Center

    Office of Vocational and Adult Education (ED), Washington, DC. National Workplace Literacy Program.

    This publication presents the abstracts of the 57 National Workplace Literacy Program 1993 projects. Each abstract provides the following information: project title; award number; project director; awardee; address; telephone and fax numbers; funds by fiscal year (federal and nonfederal); award period; federal project officer; objectives;…

  10. 76 FR 12080 - TRICARE Access to Care Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... DEPARTMENT OF DEFENSE Office of the Secretary TRICARE Access to Care Demonstration Project AGENCY..., Section 1092, entitled Department of Defense TRICARE Access to Care Demonstration Project. The demonstration project is intended to improve access to urgent care including minor illness or injury for Coast...

  11. 7 CFR 1778.7 - Project priority.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 12 2010-01-01 2010-01-01 false Project priority. 1778.7 Section 1778.7 Agriculture... (CONTINUED) EMERGENCY AND IMMINENT COMMUNITY WATER ASSISTANCE GRANTS § 1778.7 Project priority. Paragraph (d... to determine the proposed project's priority for available funds. (b) State Office review. All...

  12. 7 CFR 1778.7 - Project priority.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 12 2014-01-01 2013-01-01 true Project priority. 1778.7 Section 1778.7 Agriculture... (CONTINUED) EMERGENCY AND IMMINENT COMMUNITY WATER ASSISTANCE GRANTS § 1778.7 Project priority. Paragraph (d... to determine the proposed project's priority for available funds. (b) State Office review. All...

  13. 7 CFR 1778.7 - Project priority.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 12 2012-01-01 2012-01-01 false Project priority. 1778.7 Section 1778.7 Agriculture... (CONTINUED) EMERGENCY AND IMMINENT COMMUNITY WATER ASSISTANCE GRANTS § 1778.7 Project priority. Paragraph (d... to determine the proposed project's priority for available funds. (b) State Office review. All...

  14. The Hubble Space Telescope's Student ERO Pilot Project: Implementing Formal and Informal Collaborative Projects

    NASA Astrophysics Data System (ADS)

    Eisenhamer, Bonnie; Ryer, H.; McCallister, D.; Taylor, J.; Bishop, M.

    2010-05-01

    The Hubble Space Telescope's Early Release Observations (EROs) were revealed to the public on September 9, 2009, and K-12 students and educators in six states across the country are joining in the celebration. Students and educators in Maryland, Ohio, New York, California, New Mexico, and Delaware have been invited to participate in the Hubble Space Telescope's Student ERO Pilot Project. This is an interdisciplinary project created by STScI's Office of Public Outreach in which students research the four ERO objects and create various types of projects. In recognition of their participation, the projects are displayed at host institutions in each state (museum, science center, school, planetarium or library) during a special public event for participating students, their families, and teachers. As part of its evaluation program, STScI's Office of Public Outreach has been conducting an evaluation of the project to determine the viability and potential of conducting large-scale, formal/informal collaborative projects in the future. This poster will highlight preliminary findings and share lessons learned.

  15. Lessons Learned from the 14-Year Systems Development of the Marine Corps Standard Accounting, Budgeting and Reporting System (SABRS)

    DTIC Science & Technology

    1994-03-01

    22202-4302. and to the Office of Managmnt and Budget, Paperwork Reduction Project (0704-0188) Wahington DC 20503. 1. AGENCY USE ONLY (Leave blank) 2...Project Officer ........................ 49 d. Program Management ..................... 50 2. User/Systems Development Team Relationship ...... 52 D...and 60’s, when programming and systems development was in its infancy, virtually all software was custom -made. The programmer designed, coded

  16. Reason and Change in Elementary Education; National Conference, The U. S. Office of Education Tri-University Project in Elementary Education (2nd, New Orleans, February 1-3, 1968).

    ERIC Educational Resources Information Center

    1968

    This document records the proceedings of the Second National Conference of the U. S. Office of Education Tri-University Project in Elementary Education, the theme of which was "Reason and Change in Elementary Education." Included are a copy of the conference program, an introduction by Paul A. Olson, conference papers accompanied by…

  17. Avionics Simulation, Development and Software Engineering

    NASA Technical Reports Server (NTRS)

    2002-01-01

    During this reporting period, all technical responsibilities were accomplished as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED14), the MSFC EXPRESS Project Office (FD31), and the Huntsville Boeing Company. Accomplishments included: performing special tasks; supporting Software Review Board (SRB), Avionics Test Bed (ATB), and EXPRESS Software Control Panel (ESCP) activities; participating in technical meetings; and coordinating issues between the Boeing Company and the MSFC Project Office.

  18. Installation Restoration Program. Phase 2. Confirmation/Quantification Stage 1. US Air Force Plant Number 42, Palmdale, California. Volume 1

    DTIC Science & Technology

    1987-02-20

    Bacteriology; 8 years professional experience; served as Project Health and Safety Officer. 1-37 o Duane R. Boline - Ph.D. in Analytical Chemistry ; M.S. in... Chemistry ; B.S.E. in Physical Science; 18 years professional experience; served as Project Quality Assurance Officer. Complete biographical data...University, 1962 M.S., Chemistry , Einporia State University 1965 Ph.D., Analytical Chemistry , Kansas State University, 1975

  19. Heritage plaza parking lots improvement project- Solar PV installation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hooks, Todd

    The Agua Caliente Band of Cahuilla Indians (ACBCI or the “Tribe”) installed a 79.95 kW solar photovoltaic (PV) system to offset the energy usage costs of the Tribal Education and Family Services offices located at the Tribe's Heritage Plaza office building, 90I Tahquitz Way, Palm Springs, CA, 92262 (the "Project"). The installation of the Solar PV system was part of the larger Heritage Plaza Parking Lot Improvements Project and mounted on the two southern carport shade structures. The solar PV system will offset 99% of the approximately 115,000 kWh in electricity delivered annually by Southern California Edison (SCE) to themore » Tribal Education and Family Services offices at Heritage Plaza, reducing their annual energy costs from approximately $22,000 annually to approximately $200. The total cost of the proposed solar PV system is $240,000.« less

  20. Recruiting physicians for office-based research.

    PubMed

    Levinson, W; Dull, V T; Roter, D L; Chaumeton, N; Frankel, R M

    1998-06-01

    Research conducted in community outpatient offices can provide insight into the common experiences of patients and physicians. However, recruiting physicians to participate in office-based research is challenging and few descriptions of methods that have been used to successfully recruit random samples of physicians are available. This article describes recruitment strategies utilized in a project that achieved high rates of participation from community-based primary care physicians and surgeons. Recruitment methods included the use of advisory boards to identify potential barriers to participation, use of respected members of the medical community as recruiters, and obtaining endorsements from physician organizations and prominent members of the medical community. Overall, 81% of physicians contacted from a sample frame agreed to participate in the project. Participating physicians most frequently reported that they participated because the project could provide them with feedback about their interviewing style. The recruitment methods described here can be generalized to other types of investigations.

  1. 50 CFR 13.5 - Information collection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Officer, MS-222 ARLSQ, U.S. Fish and Wildlife Service, Washington, DC 20240, or the Office of Management and Budget, Paperwork Reduction Project (1018-0092), Washington, DC 20603. [63 FR 52634, Oct. 1, 1998] ...

  2. 50 CFR 15.4 - Information collection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Collection Control Officer, MS-222 ARLSQ, U.S. Fish and Wildlife Service, Washington, DC 20240, or the Office of Management and Budget, Paperwork Reduction Project (1018-0093), Washington, DC 20603. [63 FR 52634...

  3. 50 CFR 17.9 - Permit applications and information collection requirements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Information Collection Control Officer, MS-222 ARLSQ, U.S. Fish and Wildlife Service, Washington, DC 20240, or the Office of Management and Budget, Paperwork Reduction Project (1018-0093/0094), Washington, DC...

  4. 24 CFR 401.420 - When must the Restructuring Plan require project-based assistance?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Relating to Housing and Urban Development (Continued) OFFICE OF HOUSING AND OFFICE OF MULTIFAMILY HOUSING ASSISTANCE RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MULTIFAMILY HOUSING MORTGAGE AND...

  5. 24 CFR 401.420 - When must the Restructuring Plan require project-based assistance?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Relating to Housing and Urban Development (Continued) OFFICE OF HOUSING AND OFFICE OF MULTIFAMILY HOUSING ASSISTANCE RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MULTIFAMILY HOUSING MORTGAGE AND...

  6. 24 CFR 401.420 - When must the Restructuring Plan require project-based assistance?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Relating to Housing and Urban Development (Continued) OFFICE OF HOUSING AND OFFICE OF MULTIFAMILY HOUSING ASSISTANCE RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MULTIFAMILY HOUSING MORTGAGE AND...

  7. 24 CFR 401.420 - When must the Restructuring Plan require project-based assistance?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Relating to Housing and Urban Development (Continued) OFFICE OF HOUSING AND OFFICE OF MULTIFAMILY HOUSING ASSISTANCE RESTRUCTURING, DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT MULTIFAMILY HOUSING MORTGAGE AND...

  8. The Role of the IR Office: Collaborating across the Institution

    ERIC Educational Resources Information Center

    Kroc, Rick

    2015-01-01

    This chapter describes a framework to guide collaboration between institutional research and other campus offices. Three examples are then provided to illustrate how the framework was applied successfully to actual projects.

  9. Region 9 Superfund Data Evaluation/Validation Guide

    EPA Pesticide Factsheets

    This guidance document is designed by EPARegion 9 Quality Assurance Office to provide assistance to project officers, Superfund contractors, and Superfund grantees in performing timely data evaluation and/or validation of laboratory data.

  10. My Work in the NASA Glenn History Office and Records Management Office

    NASA Technical Reports Server (NTRS)

    Mate, Robert C.

    2004-01-01

    This is my fourth summer working with my mentor, Kevin P. Coleman, who is the Center History Coordinator, Center Records Manager, and Center Forms Manager. I am working in the GRC History Office with some overlap in the Records Management Office. I have three major projects this summer. First, I am assisting in the documentation of historic facilities. Second, I am involved in a project to organize files and create an archives at Plum Brook Station. Third, I have helped the records management office with its inventory of stored records at Plum Brook. Also, I received an award this summer for research work I had done for NASA in the past. First, my primary project is to help assemble documentation for historic facilities at Glenn. This is somewhat of an extension of my project from last summer. Last summer, I worked to compile a complete list of all of NASA s historic sites and landmarks (as designated by the National Park Service, as well as several private organizations) throughout the country. Then, I briefly researched the significance of historic designation under federal law. Finally, I put my findings into a report which was submitted to NASA Headquarters. Upon review by the NASA History Office and several center-level history officials, it was decided that NASA should work to update its documentation of its historic sites and landmarks since some of the documentation was outdated or unavailable. Until recently, many project managers and facility managers working at historic facilities were not even aware that their surroundings had been designated as historic under federal law (most specifically, the National Historic Preservation Act of 1966 and its amendments). Therefore, they were unaware of the legal obligations for historic preservation. This summer, my project is to research some of Glenn s historic sites and landmarks in more detail. The goal is to put together a template for documenting historic NASA facilities. The hope is that this template of requirements for historic documentation of facilities (which may include records, drawings, photos, film, interviews, and a Web site) can be used agency-wide to assist center history offices in documenting historic sites and landmarks. To this end, I am working with Bob Arrighi, an archivist from InDyne, Inc., and Anne Burke, a NASA co-op, to gather and assess the historic value of records from several facilities at Glenn and Plum Brook Station. We will also work to determine the costs of each part of the template.

  11. 5 CFR 470.317 - Project evaluation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Project evaluation. 470.317 Section 470.317 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration...

  12. The pioneer projects: Economical exploration of the solar system

    NASA Technical Reports Server (NTRS)

    Spahr, J. R.; Hall, C. F.

    1975-01-01

    The interplanetary Pioneer missions are reviewed in terms of management implications and cost control. The responsibilities, organizational structure, and management practices of the Pioneer Projects are presented. The lines of authority and areas of responsibility of the principal organizational elements supporting the Pioneer missions are identified, and the methods employed for maintaining effective and timely interactions among these elements are indicated. The technical and administrative functions of the various organizational elements of the Pioneer Project Office at Ames Research Center are described in terms of their management responsibilities and interactions with other elements of the Project Office and with external organizations having Pioneer Project responsibilities. The management and control of activities prior to and during the hardware procurement phase are described to indicate the basis for obtaining visibility of the technical progress, utilization of resources, and cost performance of the contractors and other institutions supporting the Pioneer projects.

  13. 40 CFR 35.1650-3 - Conditions on award.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... non-Federal share of the project costs. (b) Phase 1. Phase 1 projects are subject to the following conditions: (1) The recipient must receive EPA project officer approval on any changes to satisfy the... additional work under the project. (c) Phase 2. Phase 2 projects are subject to the following conditions: (1...

  14. 40 CFR 35.1650-3 - Conditions on award.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... non-Federal share of the project costs. (b) Phase 1. Phase 1 projects are subject to the following conditions: (1) The recipient must receive EPA project officer approval on any changes to satisfy the... additional work under the project. (c) Phase 2. Phase 2 projects are subject to the following conditions: (1...

  15. 40 CFR 35.1650-3 - Conditions on award.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... non-Federal share of the project costs. (b) Phase 1. Phase 1 projects are subject to the following conditions: (1) The recipient must receive EPA project officer approval on any changes to satisfy the... additional work under the project. (c) Phase 2. Phase 2 projects are subject to the following conditions: (1...

  16. 40 CFR 35.1650-3 - Conditions on award.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... non-Federal share of the project costs. (b) Phase 1. Phase 1 projects are subject to the following conditions: (1) The recipient must receive EPA project officer approval on any changes to satisfy the... additional work under the project. (c) Phase 2. Phase 2 projects are subject to the following conditions: (1...

  17. 40 CFR 35.1650-3 - Conditions on award.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... non-Federal share of the project costs. (b) Phase 1. Phase 1 projects are subject to the following conditions: (1) The recipient must receive EPA project officer approval on any changes to satisfy the... additional work under the project. (c) Phase 2. Phase 2 projects are subject to the following conditions: (1...

  18. 34 CFR 350.10 - What are the general requirements for Disability and Rehabilitation Research Projects?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Rehabilitation Research Projects? 350.10 Section 350.10 Education Regulations of the Offices of the Department of... DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM What Projects Does the Secretary Assist? § 350.10 What are the general requirements for Disability and Rehabilitation Research Projects...

  19. 77 FR 69601 - Science and Technology Reinvention Laboratory (STRL) Personnel Management Demonstration Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ...) Personnel Management Demonstration Projects AGENCY: Office of the Deputy Assistant Secretary of Defense... to demonstration project plans. SUMMARY: Section 342(b) of the National Defense Authorization Act... the NDAA for FY 2001, authorizes the Secretary of Defense to conduct personnel demonstration projects...

  20. 75 FR 27865 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ... of coverage of the AFRL Personnel Demonstration Project to AFRL employees in Business Management and... conduct demonstration projects to determine whether a specified change in personnel management policies or... plan to employ the personnel management demonstration project authorities granted to the Office of...

  1. 7 CFR 2500.047 - Project meetings.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Project meetings. 2500.047 Section 2500.047... Post-Award and Closeout § 2500.047 Project meetings. In addition to reviewing and monitoring the status of progress and final technical reports and financial reports, OAO Project Officers may use regular...

  2. 7 CFR 2500.047 - Project meetings.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Project meetings. 2500.047 Section 2500.047... Post-Award and Closeout § 2500.047 Project meetings. In addition to reviewing and monitoring the status of progress and final technical reports and financial reports, OAO Project Officers may use regular...

  3. Eighth year projects and activities of the Environmental Remote Sensing Applications Laboratory (ERSAL). [Oregon

    NASA Technical Reports Server (NTRS)

    Lewis, A. J.; Isaacson, D. L.; Schrumpf, B. J. (Principal Investigator)

    1980-01-01

    Projects completed for the NASA Office of University Affairs include the application of remote sensing data in support of rehabilitation of wild fire damaged areas and the use of LANDSAT 3 return beam vidicon in forestry mapping applications. Continuing projects for that office include monitoring western Oregon timber clearcut; detecting and monitoring wheat disease; land use monitoring for tax assessment in Umatilla, Lake, and Morrow Counties; and the use of Oregon Air National Guard thermal infrared scanning data. Projects funded through other agencies include the remote sensing inventory of elk in the Blue Mountains; the estimation of burned agricultural acreage in the Willamette Valley; a resource inventory of Deschutes County; and hosting a LANDSAT digital workshop.

  4. Integration of Composite Structures in Modern Day Architecture: Case Study of City Business Centre, Timisoara, Romania

    NASA Astrophysics Data System (ADS)

    Vataman, Adina; Gaivoronschi, Vlad; Mosoarca, Marius

    2017-10-01

    In current day structural design the use of composite steel-concrete structures has become the norm; because of the advantages that each of these materials has to offer. Composite structures also have the benefit of a faster execution at a lower cost, compared to traditional structures. While the arguments in favour of designing composite structures are well-known and appreciated by civil engineers; there remains a question of integrating these structures in modern-day urban landscapes. Eastern European countries are welcoming a blossoming of culture, arts, economy and industry, which unavoidably and necessarily will lead to a change in urban landscapes. With an increasing amount of foreign companies opening offices in these areas, the need for modern office solutions has arisen. The current paper presents a case study of an office building complex situated in the western part of Romania, in the city of Timişoara. The complex consists of 5 office buildings; all designed in composite steel-concrete structure, an underground parking lot, multiple terraces and adjacent promenade areas. Within the context of rapid growth and development of the city, the City Business Centre has offered high quality office spaces in the heart of the city, while considering the needs of the community. A very important aspect in the successful completion of the project was the efficient and professional collaboration between the separate project teams, between the owner, represented by the project management team, the architect, the structural designer and the building company. The successful joining of seismic structural solutions with modern architectural aesthetics has led to a dynamic, vibrant environment, making the City Business Centre the core of the region’s business life, at the same time redefining Timisoara’s architectural landscape. A testimony to the success of the project was the Civil Engineering Structural Designers Associations’ (AICPS) 3rd Prize awarded for great performance and quality in structural design. The project was also awarded a „Green Building of the Year” award by the Romanian Green Building Council and also the „Office Development of the Year” in South-Eastern Europe awarded at the Real Estate Awards by an international jury of renowned real estate developers, consulting firms and investment banks. The project was also selected by the European Architects’ Council to represent Romania in a Sustainable Architecture Exhibition at the European Parliament in Brussels.

  5. Final report of the decontamination and decommissioning of Building 34 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-08-01

    The U.S. Department of Energy (DOE) Grand Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, was also the remedialmore » action contractor. Building 34 was radiologically contaminated and the building was demolished in 1996. The soil area within the footprint of the building was analyzed and found to be not contaminated. The area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual closeout report for each contaminated GJPO building.« less

  6. Final report of the decontamination and decommissioning of Building 44 at the Grand Junction Projects Office Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Widdop, M.R.

    1996-07-01

    The U.S. Department of Energy (DOE) Junction Projects Office (GJPO) occupies a 61.7 acre facility along the Gunnison River near Grand Junction, Colorado. This site was contaminated with uranium ore and mill tailings during uranium refining activities of the Manhattan Engineer District and during pilot milling experiments conducted for the U.S. Atomic Energy Commission`s domestic uranium procurement program. The DOE Defense Decontamination and Decommissioning Program established the Grand Junction Projects Office Remedial Action Project to clean up and restore the facility lands, improvements, and the underlying aquifer. The site contractor for the facility, Rust Geotech, is also the remedial actionmore » contractor. Building 44 was radiologically contaminated and the building was demolished in 1994. The soil area within the footprint of the building was not contaminated; it complies with the identified standards and the area can be released for unlimited exposure and unrestricted use. This document was prepared in response to a DOE request for an individual final report for each contaminated GJPO building.« less

  7. Notification: EPA Conferences – Maximizing Cost Efficiencies

    EPA Pesticide Factsheets

    Project #OA-FY14-0381, February 2, 2015. The EPA OIG plans to begin field work with an objective modified from our October 2, 2014, kickoff meeting with the Office of the Chief Financial Officer (OCFO).

  8. ISO 14000 RESOURCE DIRECTORY

    EPA Science Inventory

    This document, developed through cooperation between EPA's Office of Research and Development and the Office of Prevention, Pesticides and Toxic Substances, is a listing of government and nonprofit organization initiatives and projects related to the International Organization fo...

  9. Notification: Review of the Contract Management Assessment Program

    EPA Pesticide Factsheets

    Project #OA-FY14-0034, October 30, 2013. The Office of Inspector General plans to begin the preliminary research phase of an audit evaluating the Office of Acquisition Management’s Contract Management Assessment Program (CMAP).

  10. Notification: Benefits to EPA Research Goals from Reimbursable Research

    EPA Pesticide Factsheets

    Project #OPE-FY15-0021, March 19, 2015. The Office of Inspector General (OIG) plans to begin preliminary research on the Office of Research and Development’s reimbursable research agreements on April 3, 2015.

  11. "Don't Forget Your Leech Socks"! Children's Learning during an Eden Education Officer's Workshop

    ERIC Educational Resources Information Center

    Bowker, Rob; Jasper, Andy

    2007-01-01

    This study looked at 30 primary aged children between 10 and 11 years old who were visiting the Eden Project, Cornwall and participating in workshops led and designed by the Eden Education Officers. The study attempted to directly test the effects of the Education Officers' workshops on children's learning. Personal meaning mapping, a…

  12. 78 FR 17935 - Proposed Collection; Comment Request: NIH Office of Intramural Training & Education Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-25

    ... Enrichment Program 100.0 1.0 1.0 100.00 (CCSEP) Technical Training Program (PBT) 115.0 1.0 1.0 115.00... Request: NIH Office of Intramural Training & Education Application SUMMARY: In compliance with the... comment on proposed data collection projects, the Office of Intramural Training & Education/OIR/OD, the...

  13. A Career Development Guide for Administrative Officers

    DTIC Science & Technology

    1984-03-01

    PROJECT, TASK AREA 6 WORK UNIT NUMBERS ACSC/EDCC MAXWELL AFB AL 36112 I I. CONTROLLING OFFICE NAME AND ADDRESS 12 . REPORT DATE ACSC/EDCC March 1984... 12 Administrative Positions.................................... 12 Squadron Administrative Officer........................ 12 Executive...Captain to Major - 6 to 11 Years....................... 49 .ajor to Lieutenant Colonel - 12 to 17 Years..........5 Lieutenant Colonel to 0-6 (or beyond

  14. 75 FR 57955 - Agency Information Collection Request; 30-Day Public Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-23

    ... approval on a revised collection, Uniform Data Set (OMB No. 0990- 0275), the tool used by the Office... notice directly to the OS OMB Desk Officer; faxed to OMB at 202-395-5806. Proposed Project: Uniform Data Set (UDS)--Reinstatement with Change--OMB No. 0990-0275-Office of Public Health Science (OPHS...

  15. 78 FR 70062 - Proposed Collection; 60-Day Comment Request: Clearance for Surveys of Customers and Partners of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-22

    ... Comment Request: Clearance for Surveys of Customers and Partners of the Office of Extramural Research of... collection projects, the Office of Extramural Research (OER), the National Institutes of Health (NIH) will... Customers and Partners of the Office of Extramural Research of the National Institutes of Health--Extension...

  16. 5 CFR 890.1303 - Eligibility.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS (CONTINUED) FEDERAL... Demonstration Project § 890.1303 Eligibility. (a) To enroll in the demonstration project, an individual must... benefit plans offered through the FEHB Program under the demonstration project. (d) When determining...

  17. 5 CFR 470.309 - Public hearing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.309... present their written or oral views concerning the proposed demonstration project. The notice of public...

  18. 5 CFR 470.313 - Project implementation regulations.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Project implementation regulations. 470.313 Section 470.313 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to...

  19. 5 CFR 470.313 - Project implementation regulations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 5 Administrative Personnel 1 2011-01-01 2011-01-01 false Project implementation regulations. 470.313 Section 470.313 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to...

  20. Defense AR Journal, Volume 15, Number 1, April 2008

    DTIC Science & Technology

    2008-04-01

    Beavers William Ruta DAUAA Research Paper Competition: 3rd Place Employing Organizational Modeling & Simulation of the KC-135 Depot’s Flight Controls Maj...AttAck munition SYStemS (jAmS) Project office imProvinG SuPPort to the wArfiGhter Barry Beavers and William Ruta The Joint Attack Munition Systems...William Ruta . This paper examines how the JAMS Project Office improved support to the warfighter with its implementation of the Life Cycle

  1. Career Profiles- Drawing Controller Kelvin Siu- Operations Engineering Branch

    NASA Image and Video Library

    2016-06-23

    The Drawing Control group provides project support in the form of drafting services, drawing version management, and drawing archival. The office provides drafting services through creation of new drawings and sketches, or integration of red-lines. They maintain physical and electronic storage of flight vehicle drawings, and archive all sketches for the AFRC community. This office is the controlling organization for all Armstrong drawing formats and maintains the drawing numbering system for flight vehicle projects.

  2. DOE Contribution to the 2015 US CLIVAR Project Office Budget

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    DeWeaver, Eric; Patterson, Michael

    The primary goal of the US Climate Variability and Predictability (CLIVAR) Project Office is to enable science community planning and implementation of research to understand and predict climate variability and change on intraseasonal-to-centennial timescales, through observations and modeling with emphasis on the role of the ocean and its interaction with other elements of the Earth system, and to serve the climate community and society through the coordination and facilitation of research on outstanding climate questions.

  3. RISK MANAGEMENT USING PROJECT RECON

    DTIC Science & Technology

    2016-11-28

    Risk Management Using Project Recon UNCLASSIFIED: Distribution Statement A. Approved for public release; distribution is unlimited. Bonnie Leece... Project Recon Lead What is Project Recon? • A web-based GOTS tool designed to capture, manage, and link Risks, Issues, and Opportunities in a...centralized database. • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any

  4. Manpower Projection Model Project, Ventura County.

    ERIC Educational Resources Information Center

    Van Zant, John L.; Lawson, William H.

    The final report on Phase 1 of the Manpower Projection Model (MPM) Project provides a guide for implementation of the model system by area Vocational Education Practitioners within any Standard Metropolitan Statistical Area (SMSA). A cooperative effort between Ventura County Superintendent of Schools Office and the Community College District, the…

  5. 34 CFR 350.12 - What are the general requirements for an Advanced Rehabilitation Research Training Project?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... multidisciplinary, and emphasizes scientific methodology, and may involve collaboration among institutions. (3... Rehabilitation Research Training Project? 350.12 Section 350.12 Education Regulations of the Offices of the... EDUCATION DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM What Projects Does the...

  6. 34 CFR 350.12 - What are the general requirements for an Advanced Rehabilitation Research Training Project?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... multidisciplinary, and emphasizes scientific methodology, and may involve collaboration among institutions. (3... Rehabilitation Research Training Project? 350.12 Section 350.12 Education Regulations of the Offices of the... EDUCATION DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM What Projects Does the...

  7. 34 CFR 350.12 - What are the general requirements for an Advanced Rehabilitation Research Training Project?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... multidisciplinary, and emphasizes scientific methodology, and may involve collaboration among institutions. (3... Rehabilitation Research Training Project? 350.12 Section 350.12 Education Regulations of the Offices of the... EDUCATION DISABILITY AND REHABILITATION RESEARCH PROJECTS AND CENTERS PROGRAM What Projects Does the...

  8. RCP Local School Projects in Alabama.

    ERIC Educational Resources Information Center

    Regional Curriculum Project, Atlanta, GA.

    One of 6 state reports generated by the Regional Curriculum Project (funded under the Elementary and Secondary Education Act), the document describes 4 specific projects implemented through the Alabama State Superintendent's Office beginning in 1966. All 4 projects were designed to improve instructional leadership by defining the role(s) of the…

  9. 78 FR 29335 - Science and Technology Reinvention Laboratory (STRL) Personnel Management Demonstration Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ...) Personnel Management Demonstration Projects AGENCY: Office of the Deputy Assistant Secretary of Defense... demonstration project plans. SUMMARY: Section 342(b) of the National Defense Authorization Act (NDAA) for Fiscal... 2001, authorizes the Secretary of Defense to conduct personnel demonstration projects at DoD...

  10. External Research: Helping Education Change for the Better, 1983-84.

    ERIC Educational Resources Information Center

    Austin Independent School District, TX. Office of Research and Evaluation.

    The Austin Independent School District (AISD) Office of Research and Development publishes abstracts of research projects conducted within the AISD by external agencies or individuals. This compilation begins with a roster of external research projects in tabular form showing the AISD project number, title, project director and sponsor, schools…

  11. 76 FR 15961 - Funding Priorities and Selection Criterion; Disability and Rehabilitation Research Projects and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-22

    ... least one, but no more than two, site-specific research projects to test innovative approaches to... Criterion; Disability and Rehabilitation Research Projects and Spinal Cord Injury Model Systems Centers and Multi-Site Collaborative Research Projects AGENCY: Office of Special Education and Rehabilitative...

  12. 78 FR 46858 - Proposed Waiver and Extension of the Project Period for the Individuals With Disabilities...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-02

    ... the Individuals With Disabilities Education Act (IDEA) Partnership Project AGENCY: Office of Special... Assistance (CFDA) Number: 84.326A.] SUMMARY: For the currently funded IDEA Partnership Project (Partnership..., authorized under section 663 of IDEA. The Partnership Project is intended to provide opportunities for...

  13. An Evaluation of the Community Education Demonstration Projects.

    ERIC Educational Resources Information Center

    Wynne, Ronald D.

    The report summarizes a six-month evaluation (July-December 1967) of 11 community education projects funded by the Office of Economic Opportunity. Major focus is on eight projects which comprised a special series of Section 207 Community Education Demonstration Projects--Appalachian Volunteers, Inc., the Columbia College Citizenship Council…

  14. 48 CFR 22.404-5 - Expiration of project wage determinations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Expiration of project wage... Involving Construction 22.404-5 Expiration of project wage determinations. (a) The contracting officer shall make every effort to ensure that contract award is made before expiration of the project wage...

  15. Assessment of the quality of groundwater and the Little Wind River in the area of a former uranium processing facility on the Wind River Reservation, Wyoming, 1987 through 2010

    USGS Publications Warehouse

    Ranalli, Anthony J.; Naftz, David L.

    2014-01-01

    In 2010, the U.S Geological Survey (USGS), in cooperation with the Wind River Environmental Quality Commission (WREQC), began an assessment of the effectiveness of the existing monitoring network at the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) site. The USGS used existing data supplied by the U.S. Department of Energy (DOE). The study was to determine (1) seasonal variations in the direction of groundwater flow in the area of the former uranium processing facility toward the Little Wind River, (2) the extent of contaminated groundwater among the aquifers and between the aquifers and the Little Wind River, (3) whether current monitoring is adequate to establish the effectiveness of natural attenuation for the contaminants of concern, and (4) the influence of groundwater discharged from the sulfuric-acid plant on water quality in the Little Wind River.

  16. Achieving Hydrogen Storage Goals through High-Strength Fiber Glass - Final Technical Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Hong; Johnson, Kenneth I.; Newhouse, Norman L.

    Led by PPG and partnered with Hexagon Lincoln and Pacific Northwest National Laboratory (PNNL), the team recently carried out a project “Achieving Hydrogen Storage Goals through High-Strength Fiber Glass”. The project was funded by DOE’s Fuel Cell Technologies office within the Office of Energy Efficiency and Renewable Energy, starting on September 1, 2014 as a two-year project to assess technical and commercial feasibilities of manufacturing low-cost, high-strength glass fibers to replace T700 carbon fibers with a goal of reducing the composite total cost by 50% of the existing, commercial 700 bar hydrogen storage tanks used in personal vehicles.

  17. Solar project cost report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hale, H.J.

    1978-01-01

    This report provides detailed cost information for the Reedy Creek Utilities solar space heating, cooling and service water heating project located in Walt Disney World, Florida. The solar energy system cools, heats and supplies service hot water for approximately 5625 ft/sup 2/ of office space in a general office building. The system was designed as an integral part of the building at the time the building was designed. The construction costs of this solar project are presented in this report. Category costs are listed by materials, direct labor, and subcontract costs. The subcontract costs include both materials, labor, overhead andmore » profit for electrical, control and other minor subcontractors.« less

  18. 2013 Geothermal Technologies Office Peer Review Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Geothermal Technologies Office

    Geothermal Technologies Office conducted its annual program peer review in April of 2013. The review provided an independent, expert evaluation of the technical progress and merit of GTO-funded projects. Further, the review was a forum for feedback and recommendations on future GTO strategic planning. During the course of the peer review, DOE-funded projects were evaluated for 1) their contribution to the mission and goals of the GTO and 2) their progress against stated project objectives. Principal Investigators (PIs) came together in sessions organized by topic “tracks” to disseminate information, progress, and results to a panel of independent experts as wellmore » as attendees.« less

  19. Recommendations for an Executive Information System (EIS) for the NASA Accounting and Financial Information System (NAFIS)

    NASA Technical Reports Server (NTRS)

    Goss, Ernest Preston

    1991-01-01

    The objectives were to: (1) survey state-of-the-art computing architectures, tools, and technologies for implementing an Executive Information System (EIS); (2) review MSFC capabilities and efforts in developing an EIS for Shuttle Projects Office and the Payloads Project Office; (3) review management reporting requirements for the NASA Accounting and Financial Information System (NAFIS) Project in the areas of cost, schedule, and technical performance, and insure that the EIS fully supports these requirements; and (4) develop and implement a pilot concept for a NAFIS EIS. A summary of the findings of this work is presented.

  20. 76 FR 27287 - Port Access Route Study: In the Bering Strait; Extension of Comment Period

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-11

    ... Lieutenant Faith Reynolds, Project Officer, Seventeenth Coast Guard District, telephone 907-463-2270; e-mail Faith.A.Reynolds@uscg.mil ; or George Detweiler, Office of Waterways Management, Coast Guard, telephone...

  1. 9. GENERAL EXTERIOR VIEW LOOKING NORTH, SHOWING FORMER FISH HATCHERY ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. GENERAL EXTERIOR VIEW LOOKING NORTH, SHOWING FORMER FISH HATCHERY OFFICE BUILDING (PRESENTLY USED AS GARDENER'S OFFICE). - Bonneville Project, Fish Hatchery, On Columbia River bordered on South by Union Pacific, Bonneville, Multnomah County, OR

  2. Web Site Development Support

    NASA Technical Reports Server (NTRS)

    Abdul, Hameed

    2016-01-01

    This summer I assisted the RPT Program Office in developing a design plan to update their existing website to current NASA web standards. The finished website is intended for the general public, specifically potential customers interested in learning about NASA's chemical rocket test facility capabilities and test assignment process. The goal of the website is to give the public insight about the purpose and function of the RPT Program. Working on this project gave me the opportunity to learn skills necessary for effective project management. The RPT Program Office manages numerous facilities so they are required to travel often to other sites for meetings throughout the year. Maneuvering around the travel schedule of the office and the workload priority of the IT Department proved to be quite the challenge. I overcame the travel schedule of the office by frequently communicating and checking in with my mentor via email and telephone.

  3. Encouraging Female Scientists to Run for Office in 2012

    NASA Astrophysics Data System (ADS)

    Landau, Elizabeth

    2010-11-01

    In 2012, there will be the first major election in the United States following a redrawing of congressional and state legislative districts based on the 2010 census results. This modification of electoral district boundaries likely will open new legislative seats and change voting demographics of districts, creating an opportunity for new candidates running for local and federal office. In the current session of Congress, just 17% of members are women, and just 24% of state legislators nationwide are women. At the 2010 AGU Fall Meeting the AGU public affairs department and The 2012 Project will present a panel discussion with female scientists who are serving or have served in elected office. The 2012 Project is a national, nonpartisan campaign to increase the number of women in legislative office by identifying and engaging accomplished women 45 years and older from underrepresented fields and industries, including the sciences.

  4. The Regional Interstate Projects in 1972-73: A Structural and Functional Description.

    ERIC Educational Resources Information Center

    Interstate Project for State Planning and Program Consolidation.

    The United States Office of Education has funded, under ESEA Title V, a network of regional projects called Interstate Projects for State Planning and Program Consolidation. The participants in the projects include all of the State education agencies. The purposes of the network of Interstate Projects are to (1) identify, analyze, and work…

  5. 76 FR 79675 - Pomperaug Hydro Project Andrew Peklo III; Notice of Site Visit and Technical Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12790-001] Pomperaug Hydro Project Andrew Peklo III; Notice of Site Visit and Technical Meeting On January 18, 2012, Office of Energy Projects staff will hold a site visit and technical meeting for the proposed Pomperaug Hydro Project (FERC...

  6. The Role of the Project Management Office on Information Technology Project Success

    ERIC Educational Resources Information Center

    Stewart, Jacob S.

    2010-01-01

    The rate of failed and challenged Information Technology (IT) projects is too high according to the CHAOS Studies by the Standish Group and the literature on project management (Standish Group, 2008). The CHAOS Studies define project success as meeting the triple constraints of scope, time, and cost. Assessing critical success factors is another…

  7. 34 CFR 664.5 - What definitions apply to the Fulbright-Hays Group Projects Abroad Program?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Projects Abroad Program? 664.5 Section 664.5 Education Regulations of the Offices of the Department of... PROJECTS ABROAD PROGRAM General § 664.5 What definitions apply to the Fulbright-Hays Group Projects Abroad... apply to this program: The following definitions apply to the Fulbright-Hays Group Projects Abroad...

  8. 34 CFR 664.5 - What definitions apply to the Fulbright-Hays Group Projects Abroad Program?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Projects Abroad Program? 664.5 Section 664.5 Education Regulations of the Offices of the Department of... PROJECTS ABROAD PROGRAM General § 664.5 What definitions apply to the Fulbright-Hays Group Projects Abroad... apply to this program: The following definitions apply to the Fulbright-Hays Group Projects Abroad...

  9. 34 CFR 664.5 - What definitions apply to the Fulbright-Hays Group Projects Abroad Program?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Projects Abroad Program? 664.5 Section 664.5 Education Regulations of the Offices of the Department of... PROJECTS ABROAD PROGRAM General § 664.5 What definitions apply to the Fulbright-Hays Group Projects Abroad... apply to this program: The following definitions apply to the Fulbright-Hays Group Projects Abroad...

  10. 34 CFR 664.5 - What definitions apply to the Fulbright-Hays Group Projects Abroad Program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Projects Abroad Program? 664.5 Section 664.5 Education Regulations of the Offices of the Department of... PROJECTS ABROAD PROGRAM General § 664.5 What definitions apply to the Fulbright-Hays Group Projects Abroad... apply to this program: The following definitions apply to the Fulbright-Hays Group Projects Abroad...

  11. 34 CFR 664.5 - What definitions apply to the Fulbright-Hays Group Projects Abroad Program?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Projects Abroad Program? 664.5 Section 664.5 Education Regulations of the Offices of the Department of... PROJECTS ABROAD PROGRAM General § 664.5 What definitions apply to the Fulbright-Hays Group Projects Abroad... apply to this program: The following definitions apply to the Fulbright-Hays Group Projects Abroad...

  12. 5 CFR 470.315 - Project modification and extension.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 5 Administrative Personnel 1 2010-01-01 2010-01-01 false Project modification and extension. 470.315 Section 470.315 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to...

  13. 5 CFR 890.1308 - Carrier participation.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 890.1308 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT (CONTINUED) CIVIL SERVICE REGULATIONS... Program Demonstration Project § 890.1308 Carrier participation. (a) All carriers who participate in the... project areas must participate in the demonstration project, except as provided for in paragraphs (b), (c...

  14. 75 FR 13111 - Office of Special Education and Rehabilitative Services Overview Information; National Institute...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ... Information; National Institute on Disability and Rehabilitation Research (NIDRR)--Disability and Rehabilitation Research Projects and Centers Program--Advanced Rehabilitation Research Training (ARRT) Projects... and Rehabilitation Research (NIDRR)--Disability and Rehabilitation Research Projects and Centers...

  15. South Philadelphia Passive Sampler Method project communication sheet

    EPA Science Inventory

    The Environmental Protection Agency, Office of Research and Development (EPA ORD), EPA Region 3, and the City of Philadelphia Air Measurements Services (AMS) are collaborating on research project in South Philadelphia starting in the spring of 2013. This project investigates how...

  16. Diversity and Black Officer Integration in the U.S. Marine Corps for 2011 and Beyond

    DTIC Science & Technology

    2011-05-06

    Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704..()1BB) Washington. DC...positions as cooks, waiters , janitors, and officers’ servants. Though segregation and exclusion from combat still ruled the day, blacks in the Army were...a team is a leadership concern with diversity implications. The effectiveness of management or the military officer is predicated on that essential

  17. The Office of the Future--Implications for Change in Education. Position Papers: Annual Business Education Invitational Forum (4th, Provo, Utah, 1977). Research and Service Project Number 4.

    ERIC Educational Resources Information Center

    Waters, Max L., Ed.

    This publication contains six position papers presented by guest businessmen during the fourth annual Business Education Invitational Forum on the topic of implications of current change and technology in the environment in the office of the future. The article, The Office in the 1970's, describes the office as it is and as it is evolving, defines…

  18. Program and Management Support for the Office of Military Performance Assessment Technology

    DTIC Science & Technology

    1991-04-30

    AD-A242 819 AD PROGRAM AND MANAGEMENT SUPPORT FOR THE OFFICE OF MILITARY PERFORMANCE ASSESSMENT TECHNOLOGY ANNUAL REPORT MARVIN FITTS APRIL 30, 1991...1991 Annual 8 Mar 90 - 7 Mar 91 Program and Management Support for the Office of DAMD17-90-C-0061 Military Performance Assessment Technology Marvin...Reporting period: 08 March 1990 - 7 March 1991 5. Project Title: Program and Management Support for the Office of Military Performance Assessment

  19. Project Interface Requirements Process Including Shuttle Lessons Learned

    NASA Technical Reports Server (NTRS)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  20. 50 CFR 81.6 - Project Agreement.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM CONSERVATION OF ENDANGERED AND THREATENED... Office of Management and Budget Circular No. A-95 (as revised). (d) The Project Agreement will follow...

  1. 50 CFR 81.6 - Project Agreement.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION PROGRAM CONSERVATION OF ENDANGERED AND THREATENED... Office of Management and Budget Circular No. A-95 (as revised). (d) The Project Agreement will follow...

  2. Will Empowerment of USAF Program Managers Mitigate the Acquisitions Crisis

    DTIC Science & Technology

    2016-06-10

    FAR Federal Acquisition Regulations GAO Government Accountability Office MDAP Major Defense Acquisition Program USAF United States Air Force ix...actually run the project. The Government Accountability Office (GAO),2 along with many other organizations, including Congress in their 2016 National...1 Government Accountability Office (GAO), GAO-06-110, Best Practices: Better Support of Weapons Systems Program Managers Needed to

  3. 78 FR 22281 - Notice of Intent To Collect Fees at the Henneberry House on Public Land in Beaverhead County...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-15

    ... local media. Fees would be collected as outlined in the field office's Fee Business Plan. The Henneberry... offset those ongoing costs. The BLM's mission for the Dillon Field Office Fee Business Plan (Project) is... addressed in the Dillon Field Office Recreation Fee Business Plan, prepared pursuant to the REA and BLM...

  4. An Analysis of Officer Accession Programs and the Career Development of U.S. Marine Corps Officers

    DTIC Science & Technology

    2003-03-01

    Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188) Washington DC 20503. 1. AGENCY USE ONLY 2...requirements for the degree of MASTER OF SCIENCE IN MANAGEMENT from the NAVAL POSTGRADUATE SCHOOL March 2003...137 APPENDIX D. TBS ACADEMIC, LEADESHIP AND MILITARY CLASS RANK MULTIVARIATE

  5. Environmental Cost Analysis System (ECAS) Status and Compliance Requirements for EM Consolidated Business Center Contracts - 13204

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sanford, P.C.; Moe, M.A.; Hombach, W.G.

    2013-07-01

    The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reportingmore » tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)« less

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cort, Katherine A.; Hostick, Donna J.; Belzer, David B.

    The purpose of this report is to compile information and conclusions gathered as part of three separate tasks undertaken as part of the overall project, “Modeling EERE Deployment Programs,” sponsored by the Planning, Analysis, and Evaluation office within the Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE). The purpose of the project was to identify and characterize the modeling of deployment programs within the EERE Technology Development (TD) programs, address improvements to modeling in the near term, and note gaps in knowledge where future research is needed.

  7. Synoptic Meteorology during the SNOW-ONE-A Field Experiment.

    DTIC Science & Technology

    1983-05-01

    AD ,34 888 SYNOPTIC METEOROLOGY DURING tHE SNOW-ONE A FIELD I EXPERIMENTIUP COLD REGIONS RESEARCH AND ENGINEERING LABHANOVER NN M A BILELLO MAY 83...PROGRAM ELEMENT. PROJECT. TASK U. S. Army Cold Regions Research and AREA & WORK UNIT NUMBERS Engineering Laboratory DA Project 4A762730AT42- Hanover, New...Hampshire 03755 B-El-5 It. CONTROLLING OFFICE NAME AND ADDRESS 12. REPORT DATE Office of the Ch ief of Engineers May 1983 Washington, D.C. 20314 13

  8. International Space Station (ISS) Expedite the Process of Experiments to Space Station (EXPRESS) Racks Software Support

    NASA Technical Reports Server (NTRS)

    2003-01-01

    bd Systems personnel accomplished the technical responsibilities for this reporting period, as planned. A close working relationship was maintained with personnel of the MSFC Avionics Department Software Group (ED 14), the MSFC EXPRESS Project Office (FD3 l), and the Huntsville Boeing Company. Work accomplishments included the support of SRB activities, ATB activities, ESCP activities, participating in technical meetings, coordinating issues between the Boeing Company and the MSFC Project Office, and performing special tasks as requested.

  9. Notification: Review of EPA’s Use of Title 42 Hiring Authority

    EPA Pesticide Factsheets

    Project #OA-FY14-0184, March 28, 2014. The U.S. Environmental Protection Agency Office of Inspector General is beginning an audit on the EPA's Office of Research and Development's use of Title 42 hiring authority.

  10. 75 FR 13135 - Notice of Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-18

    ...). Grant applications for the Medical Liability and Safety Demonstration Projects (R18) applications are to... disclosure under the above-cited statutes. SEP Meeting on: Medical Liability and Safety Demonstration.... Bonnie Campbell, Committee Management Officer, Office of Extramural Research, Education and Priority...

  11. 5 CFR 470.203 - Eligible parties.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Research Programs § 470.203 Eligible parties. Research may be conducted by the Office of Personnel Management, or under contract or...

  12. EPA Announces Collaborative Innovative Research in Mass. and New York to Address State Environmental Issues

    EPA Pesticide Factsheets

    Today, the U.S. Environmental Protection Agency (EPA) announced research projects addressing priority environmental and human health problems in 14 states through partnerships between EPA’s research office, regional offices, and states.

  13. Electrical engineering support of telemetered traffic monitoring sites : final report, March 2009.

    DOT National Transportation Integrated Search

    2009-03-01

    "The aim of this project was to provide electrical engineering support for the telemetered traffic monitoring sites (TTMS) operated by the Statistics Office of the Florida Department of Transportation. This project was a companion to project BD-543-1...

  14. 31 CFR 500.576 - Authorization of transactions concerning certain development projects in Vietnam.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Regulations Relating to Money and Finance (Continued) OFFICE OF FOREIGN ASSETS CONTROL, DEPARTMENT OF THE TREASURY FOREIGN ASSETS CONTROL REGULATIONS Licenses, Authorizations and Statements of Licensing Policy... section, Qualified Projects include investment projects, structural adjustment lending, sector adjustment...

  15. 76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ... and administer an office on Central Valley Project water conservation best management practices that... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  16. 75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior ACTION: Notice of Availability. SUMMARY: The...

  17. 78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review... establish and administer an office on Central Valley Project water conservation best management practices...

  18. 76 FR 12756 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  19. 75 FR 38538 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... to establish and administer an office on Central Valley Project water conservation best management... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  20. 76 FR 82286 - Applications for New Awards; Disability and Rehabilitation Research Projects and Centers Program...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-30

    ... DEPARTMENT OF EDUCATION Applications for New Awards; Disability and Rehabilitation Research Projects and Centers Program--Advanced Rehabilitation Research Training (ARRT) Projects AGENCY: Office of... Research, Department of Education. ACTION: Notice. Overview Information Disability and Rehabilitation...

Top