Sample records for umtra project processing

  1. Evaluation of impacts and mitigation assessments for the UMTRA Project: Gunnison and Durango pilot studies. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beranich, S.J.

    1994-08-24

    This report evaluates the impacts assessment and proposed mitigations provided in environmental documents concerning the US Department of Energy`s (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project. The projected impacts and proposed mitigations identified in UMTRA Project environmental documents were evaluated for two UMTRA Project sites. These sites are Gunnison and Durango, which are representative of currently active and inactive UMTRA Project sites, respectively. National Environmental Policy Act (NEPA) documentation was prepared for the remedial action at Durango and Gunnison as well as for the provision of an alternate water supply system at Gunnison. Additionally, environmental analysis was completed formore » mill site demolition Gunnison, and for a new road related to the Durango remedial action. The results in this report pertain only to the impact assessments prepared by the Regulatory Compliance staff as a part of the NEPA compliance requirements. Similarly, the mitigative measures documented are those that were identified during the NEPA process.« less

  2. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Metzler, D.; Gibb, J.P.; Glover, W.A.

    Compliance with the mandate of the Uranium Mill Tailings Radiation Control Act (UMTRCA) at Uranium Mill Tailings Remedial Action (UMTRA) Project sites requires implementation of a groundwater remedial action plan that meets the requirements of Subpart B of the US Environmental Protection Agency`s proposed groundwater protection standards (40 CFR 192). The UMTRA Groundwater Project will ensure that unacceptable current risk or potential risk to the public health, safety and the environment resulting from the groundwater contamination attributable to the UMTRA sites, is mitigated in a timely and cost-efficient manner. For each UMTRA processing site and vicinity property where contamination exists,more » a groundwater remedial action plan must be developed that identifies hazardous constituents and establishes acceptable concentration limits for the hazardous constituents as either (a) alternate concentration limits (ACL), (b) maximum concentration limits (MCLs), (c) supplemental standards, or (d) background groundwater quality levels. Project optimization is a strategy that will aggressively work within the current regulatory framework using all available options to meet regulatory requirements. This strategy is outlined within.« less

  3. UMTRA project list of reportable occurrences

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-04-01

    This UMTRA Project List of Reportable occurrences is provided to facilitate efficient categorization of reportable occurrences. These guidelines have been established in compliance with DOE minimum reporting requirements under DOE Order 5000.3B. Occurrences are arranged into nine groups relating to US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project operations for active sites. These nine groupings are provided for reference to determined whether an occurrence meets reporting requirement criteria in accordance with the minimum reporting requirements. Event groups and significance categories that cannot or will not occur, and that do not apply to UMTRA Project operations, aremore » omitted. Occurrence categorization shall be as follows: Group 1. Facility Condition; Group 2. Environmental; Group 3. Personnel Safety; Group 4. Personnel Radiation Protection; Group 5. Safeguards and Security; Group 6. Transportation; Group 7. Value Basis Reporting; Group 8. Facility Status; and Group 9. Cross-Category Items.« less

  4. UMTRA Project water sampling and analysis plan, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    Planned, routine ground water sampling activities at the US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site in Durango, Colorado, are described in this water sampling and analysis plan. The plan identifies and justifies the sampling locations, analytical parameters, detection limits, and sampling frequency for the routine monitoring stations at the site. The ground water data are used to characterize the site ground water compliance strategies and to monitor contaminants of potential concern identified in the baseline risk assessment (DOE, 1995a). Regulatory basis for routine ground water monitoring at UMTRA Project sites is derived from themore » US EPA regulations in 40 CFR Part 192 (1994) and EPA standards of 1995 (60 FR 2854). Sampling procedures are guided by the UMTRA Project standard operating procedures (SOP) (JEG, n.d.), the Technical Approach Document (TAD) (DOE, 1989), and the most effective technical approach for the site.« less

  5. Environmental Assessment of Ground Water Compliance at the Durango, Colorado, UMTRA Project Site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    N /A

    2002-11-29

    The U.S. Department of Energy (DOE) is proposing a ground water compliance strategy for the Uranium Mill Tailings Remedial Action (UMTRA) Project site near Durango, Colorado. DOE has prepared this environmental assessment to provide the public with information concerning the potential effects of this proposed strategy.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wood, D.E.

    This report presents discussions given at a conference on environmental remediation, September 8--11, Pasco, Washington. Topics include: public confidence; education; in-situ remediation; Hanford tank operations; risk assessments; field experiences; standards; site characterization and monitoring; technology discussions; regulatory issues; compliance; and the UMTRA project. Individual projects are processed separately for the data bases.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The site observational work plan (SOWP) for the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) Project Site is the first document for the UMTRA Ground Water Project to address site-specific activities to meet compliance with the U.S. Environmental Protection Agency (EPA) proposed ground water standards (52 FR 36000 (1987)). In support of the activities the regulatory framework and drivers are presented along with a discussion of the relationship of this SOWP to other UMTRA Ground Water Project programmatic documents. A combination of the two compliance strategies that will be recommended for this site are no remediation with the applicationmore » of alternate concentration levels (ACL) and natural flushing in conjunction with institutional controls. ACLs are to be applied to constituents that occur at concentrations above background levels but which are essential nutrients and occur within nutritional ranges and/or have very low toxicity and high dietary intake rates compared to the levels detected in the ground water. The essential premise of natural flushing is that ground water movement and natural attenuation processes will reduce the detected contamination to background levels within 1 00 years. These two recommended compliance strategies were evaluated by applying Riverton site-specific data to the compliance framework developed in the UMTRA Ground Water programmatic environmental impact statement. There are three aquifers beneath the site: a surficial unconfined aquifer, a middle semiconfined aquifer, and a deeper confined aquifer. The milling-related contamination at the site has affected both the surficial and semiconfined aquifers, although the leaky shale aquifers separating these units limits the downward migration of contamination into the semiconfined aquifer. A shale aquitard separates the semiconfined aquifer from the underlying confined aquifer which has not been contaminated by milling-related constituents.« less

  8. Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-03-01

    This long-term surveillance plan (LTSP) for the Durango, Colorado, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Durango (Bodo Canyon) disposal site, which will be referred to as the disposal site throughout this document. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal site continues to function as designed. This LTSP was prepared as a requirement for acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). RRMs include tailings and other uranium ore processing wastesmore » still at the site, which the DOE determines to be radioactive. This LTSP is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992).« less

  9. Buffer zone monitoring plan for the Dos Rios subdivision, Gunnison, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    This report presents a plan for water quality monitoring at the Dos Rios subdivision (Units 2, 3, and the Island Unit) that is intended to satisfy the informational needs of residents who live southwest (downgradient) of the former Gunnison processing site. Water quality monitoring activities described in this report are designed to protect the public from residual contamination that entered the ground water as a result of previous uranium milling operations. Requirements presented in this monitoring plan are also included in the water sampling and analysis plan (WSAP) for the Gunnison Uranium Mill Tailings Remedial Action (UMTRA) Project site. Themore » Gunnison WSAP is a site-specific document prepared by the U.S. Department of Energy (DOE) that provides background, guidance, and justification for future ground water sampling and analysis activities for the UMTRA Project Gunnison processing and disposal sites. The WSAP will be updated annually, as additional water quality data are collected and interpreted, to provide ongoing protection for public health and the environment.« less

  10. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    For the UMTRA Project site located near Durango, Colorado (the Durango site), the Surface Project cleanup occurred from 1986 to 1991. An evaluation was made to determine whether exposure to ground water contaminated by uranium processing could affect people`s health. Exposure could occur from drinking water pumped from a hypothetical well drilled in the contaminated ground water area. In addition, environmental risks may result if plants or animals are exposed to contaminated ground water, or surface water that has mixed with contaminated ground water. This risk assessment report is the first site-specific document prepared for the UMTRA Ground Water Projectmore » at the Durango site. The results of this report and further site characterization of the Durango site will be used to determine what is necessary to protect public health and the environment, and to comply with the EPA standards.« less

  11. Baseline risk assessment of ground water contamination at the uranium mill tailings site near Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1995-02-01

    This risk assessment evaluates the possibility of health and environmental risks from contaminated ground water at the uranium mill tailings site near Durango, Colorado. The former uranium processing site`s contaminated soil and material were removed and placed at a disposal site located in Body Canyon, Colorado, during 1986--1991 by the US Departments of Energy`s Uranium Mill Tailings Remedial Action (UMTRA) Project. Currently, the UMTRA Project is evaluating the nature and extent of ground water contamination at the site. This risk assessment follows an approach similar to that used by the US Environmental Protection Agency. The first step is to determinemore » what site-related contaminants are found in ground water samples. The next step in the risk assessment is to determine how much of these contaminants people might ingest if they got their drinking water from a well on the site. In accordance with standard practice for this type of risk assessment, the highest contaminant concentrations from the most contaminated wells are used. The risk assessment then explains the possible health problems that could result from this amount of contamination.« less

  12. Long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    This long-term surveillance plan (LTSP) for the Uranium Mill Tailings Remedial Act on (UMTRA) Project Bodo Canyon disposal site at Durango, Colorado, describes the surveillance activities for the disposal site. The US Department of Energy (DOE) will carry out these activities to ensure that the disposal call continues to function as designed This LTSP was prepared as a requirement for DOE acceptance under the US Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM) from processing uranium ore. This LTSP documents that the land and interests are owned by the United States andmore » details how long-term care of the disposal site will be carried out. It is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a). Following the introduction, contents of this report include the following: site final condition; site drawings and photographs; permanent site surveillance features; ground water monitoring; annual site inspections; unscheduled inspections; custodial maintenance; corrective action; record keeping and reporting requirements; emergency notification and reporting; quality assurance; personal health and safety; list of contributions; and references.« less

  13. Technical approach to groundwater restoration. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1993-11-01

    The Technical Approach to Groundwater Restoration (TAGR) provides general technical guidance to implement the groundwater restoration phase of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The TAGR includes a brief overview of the surface remediation and groundwater restoration phases of the UMTRA Project and describes the regulatory requirements, the National Environmental Policy Act (NEPA) process, and regulatory compliance. A section on program strategy discusses program optimization, the role of risk assessment, the observational approach, strategies for meeting groundwater cleanup standards, and remedial action decision-making. A section on data requirements for groundwater restoration evaluates the data quality objectives (DQO) andmore » minimum data required to implement the options and comply with the standards. A section on sits implementation explores the development of a conceptual site model, approaches to site characterization, development of remedial action alternatives, selection of the groundwater restoration method, and remedial design and implementation in the context of site-specific documentation in the site observational work plan (SOWP) and the remedial action plan (RAP). Finally, the TAGR elaborates on groundwater monitoring necessary to evaluate compliance with the groundwater cleanup standards and protection of human health and the environment, and outlines licensing procedures.« less

  14. Department of Energy PEIS scoping session

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Badar, L

    1992-12-10

    This is the second programmatic environmental impact statement scoping session held in Durango, Colorado. The purpose was: to present the ground water program so as to build some familiarity and understanding about the issue involved; and to get Durango community's input. Scoping is the collection of information and getting everyone involved and really making a team out of coming up with a proposed action. This report contains the presentations made by the project manager for the Uranium Mill Tailings (UMTRA) program, site manager for the Durango UMTRA site, manager of ground water hydrology, and include comments made by local residents.

  15. In situ remediation of uranium contaminated groundwater

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dwyer, B.P.; Marozas, D.C.

    1997-02-01

    In an effort to develop cost-efficient techniques for remediating uranium contaminated groundwater at DOE Uranium Mill Tailing Remedial Action (UMTRA) sites nationwide, Sandia National Laboratories (SNL) deployed a pilot scale research project at an UMTRA site in Durango, CO. Implementation included design, construction, and subsequent monitoring of an in situ passive reactive barrier to remove Uranium from the tailings pile effluent. A reactive subsurface barrier is produced by emplacing a reactant material (in this experiment various forms of metallic iron) in the flow path of the contaminated groundwater. Conceptually the iron media reduces and/or adsorbs uranium in situ to acceptablemore » regulatory levels. In addition, other metals such as Se, Mo, and As have been removed by the reductive/adsorptive process. The primary objective of the experiment was to eliminate the need for surface treatment of tailing pile effluent. Experimental design, and laboratory and field results are discussed with regard to other potential contaminated groundwater treatment applications.« less

  16. In situ remediation of uranium contaminated groundwater

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dwyer, B.P.; Marozas, D.C.

    1997-12-31

    In an effort to develop cost-efficient techniques for remediating uranium contaminated groundwater at DOE Uranium Mill Tailing Remedial Action (UMTRA) sites nationwide, Sandia National Laboratories (SNL) deployed a pilot scale research project at an UMTRA site in Durango, CO. Implementation included design, construction, and subsequent monitoring of an in situ passive reactive barrier to remove Uranium from the tailings pile effluent. A reactive subsurface barrier is produced by emplacing a reactant material (in this experiment - various forms of metallic iron) in the flow path of the contaminated groundwater. Conceptually the iron media reduces and/or adsorbs uranium in situ tomore » acceptable regulatory levels. In addition, other metals such as Se, Mo, and As have been removed by the reductive/adsorptive process. The primary objective of the experiment was to eliminate the need for surface treatment of tailing pile effluent. Experimental design, and laboratory and field preliminary results are discussed with regard to other potential contaminated groundwater treatment applications.« less

  17. US Department of Energy response to standards for remedial actions at inactive uranium processing sites: Proposed rule

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1988-01-29

    The Title I groundwater standards for inactive uranium mill tailings sites, which were promulgated on January 5, 1983, by the US Environmental Protection Agency (EPA) for the Uranium Mill Tailings Remedial Action (UMTRA) Project, were remanded to the EPA on September 3, 1985, by the US Tenth Circuit Court of Appeals. The Court instructed the EPA to compile general groundwater standards for all Title I sites. On September 24, 1987, the EPA published proposed standards (52FR36000-36008) in response to the remand. This report includes an evaluation of the potential effects of the proposed EPA groundwater standards on the UMTRA Project,more » as well as a discussion of the DOE's position on the proposed standards. The report also contains and appendix which provides supporting information and cost analyses. In order to assess the impacts of the proposed EPA standards, this report summarizes the proposed EPA standards in Section 2.0. The next three sections assess the impacts of the three parts of the EPA standards: Subpart A considers disposal sites; Subpart B is concerned with restoration at processing sites; and Subpart C addresses supplemental standards. Section 6.0 integrates previous sections into a recommendations section. Section 7.0 contains the DOE response to questions posed by the EPA in the preamble to the proposed standards. 6 refs., 5 figs., 3 tabs.« less

  18. UMTRA project water sampling and analysis plan, Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-01-01

    Surface remedial action has been completed at the Uranium Mill Tailings Remedial Action Project in Durango, Colorado. Contaminated soil and debris have been removed from the former processing site and placed in the Bodo Canyon disposal cell. Ground water at the former uranium mill/tailings site and raffinate pond area has been contaminated by the former milling operations. The ground water at the disposal site was not impacted by the former milling operations at the time of the cell`s construction. Activities for fiscal 1994 involve ground water sampling and site characterization of the disposal site.

  19. Site observational work plan for the UMTRA Project site at Monument Valley, Arizona

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-09-01

    The site observational work plan (SOWP) for the Monument Valley, Arizona, US Department of Energy (DOE) Uranium Mill Tailings Remedial Action (UMTRA) Project site is one of the first site-specific documents developed to achieve ground water compliance at the site. This SOWP applies information about the Monument Valley site to a regulatory compliance framework that identifies strategies that could be used to meet ground water compliance. The compliance framework was developed in the UMTRA Ground Water programmatic environmental impact statement (DOE, 1995). The DOE`s goal is to implement a cost-effective site strategy that complies with the US Environmental Protection Agencymore » (EPA) ground water standards and protects human health and the environment. The compliance strategy that emerges in the final version of the SOWP will assess potential environmental impacts and provide stakeholder a forum for review and comment. When the compliance strategy is acceptable, it will be detailed in a remedial action plan that will be subject to review by the state and/or tribe and concurrence by the US Nuclear Regulatory Commission (NRC). Information available for the preparation of this SOWP indicates active remediation is the most likely compliance strategy for the Monument Valley site. Additional data are needed to determine the most effective remediation technology.« less

  20. Wildlife mitigation and monitoring report Gunnison, Colorado, site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-04-01

    The Uranium Mill Tailings Remedial Action (UMTRA) Project is administered by the U.S. Department of Energy (DOE); its purpose is to cleanup uranium mill tailings and other contaminated material at 24 UMTRA Project sites in 10 states. This report summarizes the wildlife mitigation and monitoring program under way at the Gunnison UMTRA Project, Gunnison, Colorado. Remedial action at the Gunnison site was completed in December 1995 and is described in detail in the Gunnison completion report. The impacts of this activity were analyzed in the Gunnison environmental assessment (EA). These impacts included two important game species: the pronghorn antelope (Antilocapramore » americans) and sage grouse (Wentrocerus urophasianus). Haul truck traffic was predicted to limit antelope access to water sources north of the Tenderfoot Mountain haul road and that truck traffic along this and other haul roads could result in antelope road kills. Clearing land at the disposal cell, haul road and borrow site activities, and the associated human activities also were predicted to negatively impact (directly and indirectly) sage grouse breeding, nesting, loafing, and wintering habitat. As a result, an extensive mitigation and monitoring plan began in 1992. Most of the monitoring studies are complete and the results of these studies, written by different authors, appear in numerous reports. This report will: (1) Analyze existing impacts and compare them to predicted impacts. (2) Summarize mitigation measures. (3) Summarize all existing monitoring data in one report. (4) Analyze the effectiveness of the mitigation measures.« less

  1. Long-term surveillance plan for the Green River, Utah, disposal site

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-06-01

    The long-term surveillance plan (LTSP) for the Green River, Utah, Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site describes the surveillance activities for the Green River disposal cell. The U.S. Department of Energy (DOE) will carry out these activities to ensure that the disposal cell continues to function as designed. This final LTSP was prepared as a requirement for acceptance under the U.S. Nuclear Regulatory Commission (NRC) general license for custody and long-term care of residual radioactive materials (RRM). This LTSP documents whether the land and interests are owned by the United States or an Indian tribe and detailsmore » how the long-term care of the disposal site will be carried out. The Green River, Utah, LTSP is based on the DOE`s Guidance for Implementing the UMTRA Project Long-term Surveillance Program (DOE, 1992a).« less

  2. Final programmatic environmental impact statement for the uranium mill tailings remedial action ground water project. Volume I

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    1996-10-01

    This programmatic environmental impact statement (PElS) was prepared for the Uranium Mill Tailings Remedial Action (UMTRA) Ground Water Project to comply with the National Environmental Policy Act (NEPA). This PElS provides an analysis of the potential impacts of the alternatives and ground water compliance strategies as well as potential cumulative impacts. On November 8, 1978, Congress enacted the Uranium Mill Tailings Radiation Control Act (UMTRCA) of 1978, Public Law, codified at 42 USC §7901 et seq. Congress found that uranium mill tailings " ... may pose a potential and significant radiation health hazard to the public, and that every reasonablemore » effort should be made to provide for stabilization, disposal, and control in a safe, and environmentally sound manner of such tailings in order to prevent or minimize other environmental hazards from such tailings." Congress authorized the Secretary of Energy to designate inactive uranium processing sites for remedial action by the U.S. Department of Energy (DOE). Congress also directed the U.S. Environmental Protection Agency (EPA) to set the standards to be followed by the DOE for this process of stabilization, disposal, and control. On January 5, 1983, EPA published standards (40 CFR Part 192) for the disposal and cleanup of residual radioactive materials. On September 3, 1985, the U.S. Court of Appeals for the Tenth Circuit set aside and remanded to EPA the ground water provisions of the standards. The EPA proposed new standards to replace remanded sections and changed other sections of 40 CFR Part 192. These proposed standards were published in the Federal Register on September 24, 1987 (52 FR 36000). Section 108 of the UMTRCA requires that DOE comply with EPA's proposed standards in the absence of final standards. The Ground Water Project was planned under the proposed standards. On January 11, 1995, EPA published the final rule, with which the DOE must now comply. The PElS and the Ground Water Project are in accordance with the final standards. The EPA reserves the right to modify the ground water standards, if necessary, based on changes in EPA drinking water standards. Appendix A contains a copy of the 1983 EPA ground water compliance standards, the 1987 proposed changes to the standards, and the 1995 final rule. Under UMTRA, DOE is responsible for bringing the designated processing sites into compliance with the EPA ground water standards and complying with all other applicable standards and requirements. The U.S. Nuclear Regulatory Commission (NRC) must concur with DOE's actions. States are full participants in the process. The DOE also must consult with any affected Indian tribes and the Bureau of Indian Affairs. Uranium processing activities at most of the inactive mill sites resulted in the contamination of ground water beneath and, in some cases, downgradient of the sites. This contaminated ground water often has elevated levels of constituents such as but not limited to uranium and nitrates. The purpose of the UMTRA Ground Water Project is to eliminate or reduce to acceptable levels the potential health and environmental consequences of milling activities by meeting the EPA ground water standards.« less

  3. Mitigation and Monitoring Plan for impacted wetlands at the Gunnison UMTRA Project site, Gunnison, Colorado. Revision 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-12-01

    The Gunnison, Colorado, abandoned uranium mill site is one site being cleaned up by the DOE under UMTRCA authority. This site`s contaminated material is being transported to a disposal site on US Bureau of Land Management (BLM) land east of Gunnison. Remedial action activities have temporarily disturbed 0.8 acre (ac) (0.3 hectares [ha]) of wetlands and permanently eliminated 4.3 ac (1.7 ha). As required by the Clean Water Act, the US Army Corps of Engineers (USACE) prepared a Section 404 Permit that addresses the loss of wetlands as a result of remedial action at the Gunnison UMTRA Project site. Themore » 404 permit includes this report as an attachment and it describes the wetland mitigation and monitoring plan. The DOE formulated this plan in consultation with the BLM and the USACE. This report represents a revised version of the mitigation and monitoring plan (DOE, 1992b).« less

  4. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tyrrell, Evan; Denny, Angelita

    Fifty-two groundwater samples and one surface water sample were collected at the Monument Valley, Arizona, Processing Site to monitor groundwater contaminants for evaluating the effectiveness of the proposed compliance strategy as specified in the 1999 Final Site Observational Work Plan for the UMTRA Project Site at Monument Valley, Arizona. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and-analysis-plan-us-department- energy-office-legacy-management-sites). Samples were collected for metals, anions, nitrate + nitrite as N, and ammonia as N analyses at all locations.

  5. Uranium Mill Tailings Remedial Action Project Safety Advancement Field Effort (SAFE) Program

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-02-01

    In 1992, the Uranium Mill Tailings Remedial Action (UMTRA) Project experienced several health and safety related incidents at active remediation project sites. As a result, the U.S. Department of Energy (DOE) directed the Technical Assistance Contractor (TAC) to establish a program increasing the DOE`s overall presence at operational remediation sites to identify and minimize risks in operations to the fullest extent possible (Attachments A and B). In response, the TAC, in cooperation with the DOE and the Remedial Action Contractor (RAC), developed the Safety Advancement Field Effort (SAFE) Program.

  6. Department of Energy Programmatic Environmental Impact Statement (PEIS) scoping session

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-12-31

    The purpose of this programmatic environmental impact statement (PEIS) scoping meeting was: to present the ground water program so as to build some familiarity and understanding about the issue involved; and to get the Durango community`s input. This report contains the presentations made by the project manager for the uranium mill tailings program, site manager for the Durango UMTRA site, manager of ground water hydrology, and includes comments made by local residents.

  7. Comment and response document for the long-term surveillance plan for the Bodo Canyon Disposal Site, Durango, Colorado, Revision 0

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-11-01

    This report contains the comment and response document for the Draft Long-Term Surveillance Plan of the Bodo Canyon Site in Durango, California. This is a part of the Uranium Mill Tailings Remedial Action (UMTRA) Project. Questions and comments regarding specific sections or statements in the report are described and then a response to each review comment or question is provided.

  8. Annual monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1995-10-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites is near the town of Gunnison, Colorado; surface remediation and the environmental impacts of remedial action are described in the Gunnison environmental assessment (EA) (DOE, 1992). Remedial action resulted in the elimination of 4.3 acres (ac) 1.7 hectares (ha) of wetlands and mitigation of this loss of wetlands is being accomplished through the enhance of 18.4 ac (7.5 ha) ofmore » riparian plant communities in six spring feed areas on Bureau of Land Management (BLM) land. The description of the impacted and mitigation wetlands is provided in the Mitigation and Monitoring Plan for Impacted Wetlands at the Gunnison UMTRA Project Site, Gunnison, Colorado (DOE, 1994), which is attached to the US Army corps of Engineers (USACE) Section 404 Permit. As part of the wetlands mitigation plan, the six mitigation wetlands were fenced in the fall of 1993 to exclude livestock grazing. Baseline of grazed conditions of the wetlands vegetation was determined during the summer of 1993 (DOE, 1994). A 5-year monitoring program of these six sites has been implemented to document the response of vegetation and wildlife to the exclusion of livestock. This annual monitoring report provides the results of the first year of the 5-year monitoring period.« less

  9. Format and style for environmental documents prepared as part of the Uranium Mill Tailings Remedial Action Program. [Uranium Mill Tailings Remedial Action (UMTRA) Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1980-06-01

    The Uranium Mill Tailings Remedial Action Program will require the preparation of several environmental impact statements and several environmental assessments. This guide begins with a section describing in general terms the efforts required to make these documents readable. The sections describe the formats to be used for the pages, headings, front matter, footnotes, lists, figures, tables, references, glossaries, indexes, and appendixes in these documents. A final section presents some rules of style to be followed in writing the texts.

  10. Synchrotron X-ray characterization of mackinawite and uraninite relevant to bio-remediation of groundwater contaminated with uranium

    NASA Astrophysics Data System (ADS)

    Carpenter, J.; Hyun, S.; Hayes, K. F.

    2010-12-01

    Uranium (U) originating from mining operations for weapon manufacturing and nuclear energy production is a significant radionuclide contaminant in groundwater local to uranium mining, uranium milling, and uranium mill tailing (UMT) storage sites. In the USA, the Department of Energy (DOE) is currently overseeing approximately 24 Uranium Mill Tailing Remediation Action (UMTRA) sites which have collectively processed over 27 million tons of uranium ore1,2. In-Situ microbial bio-reduction of the highly mobile U6+ ion into the dramatically less mobile U4+ ion has been demonstrated as an effective remedial process to inhibit uranium migration in the aqueous phase3. The resistance of this process to oxidization and possible remobilization of U when bioremediation stops (and oxidants such as oxygen from the air or nitrate in water diffuse into the formation) in the long term is not known. UMTRA site studies3 have shown that iron sulfide solids are produced by sulfate reducing bacteria (SRB) during U bioremediation, and some forms of these iron sulfide solids are known to be effective oxidant scavengers, potentially protecting against re-oxidation and thus remobilization of U. This work is investigating the role of iron sulfide solids in the long-term immobilization of reduced U compounds after bioremediation is completed in groundwater local to UMTRA sites. Re-oxidation tests are being performed in packed media columns loaded with both FeS and U solids. High quality mackinawite (FeS), and uraninite (UO2) have been synthesized in our laboratory via a wet chemistry approach. These synthetic materials are expected to mimic the naturally occurring and biogenic materials present in biologically stimulated UMTRA sites. In order to establish the initial conditions of the prepared experimental columns and to compare synthetic and biogenic FeS and UO2, these synthesized materials have been characterized with synchrotron radiation at the Stanford Synchrotron Radiation Lightsource using synchrotron x-ray powder diffraction (SXRD) and extended x-ray absorption fine structure (EXAFS). SXRD data were collected and analyzed with profile fitting to determine lattice parameters and crystallite size for comparison with published values for both biogenic and synthetic materials. This is particularly of interest for UO2, as there is very little information on particle size and lattice parameters for synthetic UO2 in the literature. Profile fitting of the SXRD data for FeS gives lattice parameters of a = b = 3.668 and a mean crystallite size of 5 to 8 nm. Both of these values are in good agreement with published values. For fresh UO2, lattice parameters were determined as a = b = c = 5.4 nm for both freshly synthesized and aged (3 months) UO2 and particle size was determined to be 3.5 nm for fresh UO2 and 5.83 nm for aged UO2. This suggests a growth mechanism for crystallites over time, and an inferred decrease in reactivity.

  11. Cleanup protocol for 226Ra-contaminated cobbly soil at UMTRA Project sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gonzales, D.E.; Millard, J.B.; Miller, M.L.

    The nonuniform distribution of 226Ra and other radiological contamination of cobbly soil encountered on several Uranium Mill Tailings Remedial Action Project sites is presented and discussed, and the concomitant challenges to the intent and implementation of the U.S. Environmental Protection Agency's soil cleanup standards are noted. In response to technical assessments and information presented to the U.S. Nuclear Regulatory Commission by the U.S. Department of Energy, the Nuclear Regulatory Commission has recently resolved the dilemma by concluding that compliance with Environmental Protection Agency soil cleanup standards for cobby soil at Uranium Mill Tailings Remedial Action Project sites would be adequatelymore » attained using bulk radionuclide concentrations, instead of requiring that the radionuclide concentration of the finer soil fraction passing a No. 4 mesh sieve met the standards. A Nuclear Regulatory Commission-approved procedure developed for cobbly soil remediation is outlined and discussed. The site-specific implementation of this procedure at Uranium Mill Tailings Remedial Action Project sites containing cobbly soil is estimated to save millions of dollars.« less

  12. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 4, Water resources protection strategy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards (Subpart A of 40 CFR 192), the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer (Cliff House/Menefee aquifer) at the point of compliance (POC) at the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site in Bodo Canyon near Durango, Colorado (DOE, 1989). Details of hydrologic site characterization at the disposal site are provided in Attachment 3, Groundwater Hydrology Report. The principal features of the water resources protectionmore » strategy for the Bodo Canyon disposal site are presented in this document.« less

  13. Guidance for implementing the long-term surveillance program for UMTRA Project Title I Disposal Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-01

    This guidance document has two purposes: it provides guidance for writing site-specific long-term surveillance plans (LTSP) and it describes site surveillance, monitoring, and long-term care techniques for Title I disposal sites of the Uranium Mill Tailings Radiation Control Act (UMTRCA) (42 USC Section 7901 et seq.). Long-term care includes monitoring, maintenance, and emergency measures needed to protect public health and safety and the environment after remedial action is completed. This document applies to the UMTRCA-designated Title I disposal sites. The requirements for long-term care of the Title I sites and the contents of the LTSPs are provided in U.S. Nuclearmore » Regulatory Commission (NRC) regulations (10 CFR Section 40.27) provided in Attachment 1.« less

  14. Remedial Action Plan and site design for stabilization of the inactive uranium mill tailings site at Durango, Colorado: Attachment 4, Water resources protection strategy. Revised final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1991-12-01

    To achieve compliance with the proposed US Environmental Protection Agency (EPA) groundwater protection standards (Subpart A of 40 CFR 192), the US Department of Energy (DOE) proposes to meet background concentrations or the EPA maximum concentration limits (MCLS) for hazardous constituents in groundwater in the uppermost aquifer (Cliff House/Menefee aquifer) at the point of compliance (POC) at the Uranium Mill Tailings Remedial Action (UMTRA) Project disposal site in Bodo Canyon near Durango, Colorado (DOE, 1989). Details of hydrologic site characterization at the disposal site are provided in Attachment 3, Groundwater Hydrology Report. The principal features of the water resources protectionmore » strategy for the Bodo Canyon disposal site are presented in this document.« less

  15. 1996 monitoring report for the Gunnison, Colorado, wetlands mitigation plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-12-01

    The US Department of Energy (DOE) administers the Uranium Mill Tailings Remedial Action (UMTRA) Project to clean up uranium mill tailings and other surface contamination at 24 abandoned uranium mill sites in 10 states. One of these abandoned mill sites was near the town of Gunnison, Colorado. Surface remediation was completed at the Gunnison site in December 1995. Remedial action resulted in the elimination of 4.3 acres of wetlands and mitigation of this loss is through the enhancement of 17.8 acres of riparian plant communities in six spring-fed areas on US Bureau of Land Management mitigation sites. A five-year monitoringmore » program was then implemented to document the response of vegetation and wildlife to the exclusion of livestock. This report provides the results of the third year of the monitoring program.« less

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peterson, Dave; Miller, David; Kautsky, Mark

    A uranium- and vanadium-ore-processing mill operated from 1954 to 1968 within the Navajo Nation near Shiprock, New Mexico. By September 1986, all tailings and structures on the former mill property were encapsulated in a disposal cell built on top of two existing tailings piles on the Shiprock site (the site) [1]. Local groundwater was contaminated by multiple inorganic constituents as a result of the milling operations. The U.S. Department of Energy (DOE) took over management of the site in 1978 as part of the Uranium Mill Tailings Remedial Action (UMTRA) Project. The DOE Office of Legacy Management currently manages ongoingmore » activities at the former mill facility, including groundwater remediation. Remediation activities are designed primarily to reduce the concentrations and total plume mass of the mill-related contaminants sulfate, uranium, and nitrate. In addition to contaminating groundwater in alluvial and bedrock sediments directly below the mill site, ore processing led to contamination of a nearby floodplain bordering the San Juan River. Groundwater in a shallow alluvial aquifer beneath the floodplain is strongly influenced by the morphology of the river channel as well as changing flows in the river, which provides drainage for regional runoff from the San Juan Mountains of Colorado. As part of a recent study of the floodplain hydrology, a revised conceptual model was developed for the alluvial aquifer along with an updated status of contaminant plumes that have been impacted by more than 10 years of groundwater pumping for site remediation purposes. Several findings from the recent study will be discussed here.« less

  17. Assessment of the quality of groundwater and the Little Wind River in the area of a former uranium processing facility on the Wind River Reservation, Wyoming, 1987 through 2010

    USGS Publications Warehouse

    Ranalli, Anthony J.; Naftz, David L.

    2014-01-01

    In 2010, the U.S Geological Survey (USGS), in cooperation with the Wind River Environmental Quality Commission (WREQC), began an assessment of the effectiveness of the existing monitoring network at the Riverton, Wyoming, Uranium Mill Tailings Remedial Action (UMTRA) site. The USGS used existing data supplied by the U.S. Department of Energy (DOE). The study was to determine (1) seasonal variations in the direction of groundwater flow in the area of the former uranium processing facility toward the Little Wind River, (2) the extent of contaminated groundwater among the aquifers and between the aquifers and the Little Wind River, (3) whether current monitoring is adequate to establish the effectiveness of natural attenuation for the contaminants of concern, and (4) the influence of groundwater discharged from the sulfuric-acid plant on water quality in the Little Wind River.

  18. Data Validation Package June 2016 Groundwater and Surface Water Sampling at the Old and New Rifle, Colorado, Processing Sites September 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    Sampling Period: June 14–17 and July 7, 2016. Water samples were collected from 36 locations at New Rifle and Old Rifle, Colorado, Disposal/Processing Sites. Planned monitoring locations are shown in Attachment 1, Sampling and Analysis Work Order. Duplicate samples were collected from New Rifle locations 0216 and 0855, and Old Rifle location 0655. One equipment blank was collected after decontamination of non-dedicated equipment used to collect one surface water sample. See Attachment 2, Trip Report for additional details. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Managementmore » Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and- analysis-plan-us-department-energy-office-legacy-management-sites). New Rifle Site Samples were collected at the New Rifle site from 16 monitoring wells and 7 surface locations in compliance with the December 2008 Groundwater Compliance Action Plan [GCAP] for the New Rifle, Colorado, Processing Site (LMS/RFN/S01920). Monitoring well 0216 could not be sampled in June because it was surrounded by standing water due to the high river stage from spring runoff, it was later sampled in July. Monitoring well 0635 and surface location 0322 could not be sampled because access through the elk fence along Interstate 70 has not been completed at this time. Old Rifle Site Samples were collected at the Old Rifle site from eight monitoring wells and five surface locations in compliance with the December 2001 Ground Water Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site (GJ0-2000-177-TAR).« less

  19. Progress Toward Remediation of Uranium Tailings in Mailuu-Suu, Kyrgyzstan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Buckley, P B; Ranville, J; Honeyman, B D

    2003-07-09

    The town of Mailuu-Suu in Kyrgyzstan inherited 23 distinct tailings deposits from Soviet-Era uranium mining operations. Mailuu-Suu is located in the narrow landslide-prone valley of the Mailuu-Suu River about 25 km from the Uzbekistan border. Large-scale release of the radioactive tailings, as a result of landslides, could lead to irreversible contamination of the river and downstream areas. The Mailuu-Suu River is a tributary to the Syr-Darya River, the Fergana valley's main source of irrigation water. The Fergana Valley is a key agricultural region and major population center that spans Kyrgyzstan, Tajikistan, and Uzbekistan. The trans-boundary nature of the Mailuu-Suu tailingsmore » issue presents an opportunity for collaboration among these Central Asian states. A cooperative approach to addressing environmental issues such as Mailuu-Suu may contribute to the region's stability by facilitating peaceful associations. Experience from remediation of sites in the US under the Uranium Mill Tailings Remediation Action Project (UMTRA) will be useful in progressing toward remediation at Mailuu-Suu.« less

  20. Bioremediation of Uranium-Contaminated Groundwater using Engineered Injection and Extraction

    NASA Astrophysics Data System (ADS)

    Greene, J. A.; Neupauer, R.; Ye, M.; Kasprzyk, J. R.; Mays, D. C.; Curtis, G. P.

    2017-12-01

    During in-situ remediation of contaminated groundwater, a treatment chemical is injected into the contaminated groundwater to react with and degrade the contaminant, with reactions occurring where the treatment chemical contacts the contaminant. Traditional in-situ groundwater remediation relies on background groundwater flow for spreading of treatment chemicals into contaminant plumes. Engineered Injection and Extraction (EIE), in which time-varying induced flow fields are used to actively spread the treatment chemical into the contaminant plume, has been developed to increase contact between the contaminant and treatment chemical, thereby enhancing contaminant degradation. EIE has been investigated for contaminants that degrade through irreversible bimolecular reaction with a treatment chemical, but has not been investigated for a contaminant governed by reversible reactions. Uranium primarily occurs in its aqueous, mobile form, U(VI), in the environment but can be bioreduced to its sparingly soluble, immobile form, U(IV), by iron reducing bacteria stimulated by an acetate amendment. In this study, we investigate the ability of EIE to facilitate and sustain favorable conditions to immobilize uranium during remediation, and to prevent re-mobilization of uranium into the aqueous phase after active remediation has ended. Simulations in this investigation are conducted using a semi-synthetic model based on physical and chemical conditions at the Naturita Uranium Mill Tailings Remedial Action (UMTRA) site in southwestern Colorado and the Old Rifle UMTRA site in western Colorado. The EIE design is optimized for the synthetic model using the Borg multi-objective evolutionary algorithm.

  1. Geochemical investigation of UMTRAP designated site at Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Markos, G.; Bush, K.J.

    1983-09-01

    This report is the result of a geochemical investigation of the former uranium mill and tailings site at Durango, Colorado. This is one in a series of site specific geochemical investigations performed on the inactive uranium mill tailings included in the UMTRA Project. The objectives of the investigation are to characterize the geochemistry, to determine the contaminant distribution resulting from the former milling activities and tailings, and to infer chemical pathways and transport mechanisms from the contaminant distribution. The results will be used to model contaminant migration and to develop criteria for long-term containment media such as a cover systemmore » which is impermeable to contaminant migration. This report assumes a familiarity with the hydrologic conditions of the site and the geochemical concepts underlying the investigation. The results reported are based on a one-time sampling of waters and solid material from the background, the area adjacent to the site, and the site. The solid samples are water extracted remove easily soluble salts and acids extracted to remove cabonates and hydroxides. The water extracts and solid samples were analyzed for the major and trace elements. A limited number of samples were analyzed for radiological components. The report includes the methods of sampling, sample processing, analysis, and data interpretation. Three major conclusions are: (1) carbonate salts and low TDS characterize the tailings; (2) the adjacent area and raffinate ponds contain contaminants deposited by a single event of fluid permeation of the soils; and (3) the Animas River adjacent to the site has elevated gross alpha activity attributed to /sup 226/Ra in the sediments derived from the tailings or milling activities.« less

  2. Microbial Functional Gene Diversity with a Shift of Subsurface Redox Conditions during In Situ Uranium Reduction

    PubMed Central

    Liang, Yuting; Van Nostrand, Joy D.; N′Guessan, Lucie A.; Peacock, Aaron D.; Deng, Ye; Long, Philip E.; Resch, C. Tom; Wu, Liyou; He, Zhili; Li, Guanghe; Hazen, Terry C.; Lovley, Derek R.

    2012-01-01

    To better understand the microbial functional diversity changes with subsurface redox conditions during in situ uranium bioremediation, key functional genes were studied with GeoChip, a comprehensive functional gene microarray, in field experiments at a uranium mill tailings remedial action (UMTRA) site (Rifle, CO). The results indicated that functional microbial communities altered with a shift in the dominant metabolic process, as documented by hierarchical cluster and ordination analyses of all detected functional genes. The abundance of dsrAB genes (dissimilatory sulfite reductase genes) and methane generation-related mcr genes (methyl coenzyme M reductase coding genes) increased when redox conditions shifted from Fe-reducing to sulfate-reducing conditions. The cytochrome genes detected were primarily from Geobacter sp. and decreased with lower subsurface redox conditions. Statistical analysis of environmental parameters and functional genes indicated that acetate, U(VI), and redox potential (Eh) were the most significant geochemical variables linked to microbial functional gene structures, and changes in microbial functional diversity were strongly related to the dominant terminal electron-accepting process following acetate addition. The study indicates that the microbial functional genes clearly reflect the in situ redox conditions and the dominant microbial processes, which in turn influence uranium bioreduction. Microbial functional genes thus could be very useful for tracking microbial community structure and dynamics during bioremediation. PMID:22327592

  3. Final Scientific/Technical Report, DE-FG02-06ER64171, Integrated Nucleic Acid System for In-Field Monitoring of Microbial Community Dynamics and Metabolic Activity – Subproject to Co-PI Eric E. Roden

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eric E. Roden

    2009-07-08

    This report summarizes research conducted in conjunction with a project entitled “Integrated Nucleic Acid System for In-Field Monitoring of Microbial Community Dynamics and Metabolic Activity”, which was funded through the Integrative Studies Element of the former NABIR Program (now the Environmental Remediation Sciences Program) within the Office of Biological and Environmental Research. Dr. Darrell Chandler (originally at Argonne National Laboratory, now with Akonni Biosystems) was the overall PI/PD for the project. The overall project goals were to (1) apply a model iron-reducer and sulfate-reducer microarray and instrumentation systems to sediment and groundwater samples from the Scheibe et al. FRC Areamore » 2 field site, UMTRA sediments, and other DOE contaminated sites; (2) continue development and expansion of a 16S rRNA/rDNA¬-targeted probe suite for microbial community dynamics as new sequences are obtained from DOE-relevant sites; and (3) address the fundamental molecular biology and analytical chemistry associated with the extraction, purification and analysis of functional genes and mRNA in environmental samples. Work on the UW subproject focused on conducting detailed batch and semicontinuous culture reactor experiments with uranium-contaminated FRC Area 2 sediment. The reactor experiments were designed to provide coherent geochemical and microbiological data in support of microarray analyses of microbial communities in Area 2 sediments undergoing biostimulation with ethanol. A total of four major experiments were conducted (one batch and three semicontinuous culture), three of which (the batch and two semicontinuous culture) provided samples for DNA microarray analysis. A variety of other molecular analyses (clone libraries, 16S PhyloChip, RT-PCR, and T-RFLP) were conducted on parallel samples from the various experiments in order to provide independent information on microbial community response to biostimulation.« less

  4. Investigation of background radiation levels and geologic unit profiles in Durango, Colorado

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Triplett, G.H.; Foutz, W.L.; Lesperance, L.R.

    1989-11-01

    As part of the Uranium Mill Tailings Remedial Action (UMTRA) Project, Oak Ridge National Laboratory (ORNL) has performed radiological surveys on 435 vicinity properties (VPs) in the Durango area. This study was undertaken to establish the background radiation levels and geologic unit profiles in the Durango VP area. During the months of May through June, 1986, extensive radiometric measurements and surface soil samples were collected in the Durango VP area by personnel from ORNL's Grand Junction Office. A majority of the Durango VP surveys were conducted at sites underlain by Quaternary alluvium, older Quaternary gravels, and Cretaceous Lewis and Mancosmore » shales. These four geologic units were selected to be evaluated. The data indicated no formation anomalies and established regional background radiation levels. Durango background radionuclide concentrations in surface soil were determined to be 20.3 {plus minus} 3.4 pCi/g for {sup 40}K, 1.6 {plus minus} 0.5 pCi/g for {sup 226}Ra, and 1.2 {plus minus} 0.3 pCi/g for {sup 232}Th. The Durango background gamma exposure rate was found to be 16.5 {plus minus} 1.3 {mu}R/h. Average gamma spectral count rate measurements for {sup 40}K, {sup 226}Ra and {sup 232}Th were determined to be 553, 150, and 98 counts per minute (cpm), respectively. Geologic unit profiles and Durango background radiation measurements are presented and compared with other areas. 19 refs., 15 figs., 5 tabs.« less

  5. Data Validation Package November 2015 Groundwater and Surface Water Sampling at the Old and New Rifle, Colorado, Processing Sites February 2016

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    Water samples were collected from 36 locations at New Rifle and Old Rifle, Colorado, Processing Sites. Duplicate samples were collected from New Rifle locations 0659 and 0855, and Old Rifle location 0304. One equipment blank was collected after decontamination of non-dedicated equipment used to collect one surface water sample. Sampling and analyses were conducted as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). New Rifle Site Samples were collected at the New Rifle site from 16 monitoring wells and 7 surface locations in compliance with the December 2008more » Groundwater Compliance Action Plan [GCAP] for the New Rifle, Colorado, Processing Site (LMS/RFN/S01920), with one exception: New Rifle location 0635 could not be sampled because it was inaccessible; a fence installed by the Colorado Department of Transportation prevents access to this location. DOE is currently negotiating access with the Colorado Department of Transportation. Analytes measured at the New Rifle site included contaminants of concern (COCs) (arsenic, molybdenum, nitrate + nitrite as nitrogen, selenium, uranium, and vanadium) ammonia as nitrogen, major cations, and major anions. Field measurements of total alkalinity, oxidation- reduction potential, pH, specific conductance, turbidity, and temperature were made at each location, and the water level was measured at each sampled well. A proposed alternate concentration limit (ACL) for vanadium of 50 milligrams per liter (mg/L), specific to the compliance (POC) wells (RFN-0217, -0659, -0664, and -0669) is included in the New Rifle GCAP. Vanadium concentrations in the POC wells were below the proposed ACL as shown in the time-concentration graphs in the Data Presentation section (Attachment 2). Time-concentration graphs from all other locations sampled are also included in Attachment 2. Sampling location RFN-0195 was misidentified for the June/August 2014 and November 2014 sampling events. (Well RFN-0609 was inadvertently sampled instead of RFN-0195 in 2014.) The results for RFN-0195 have been corrected, and are included in associated time-concentration graphs for this location. Recent results for RFN-0195 are consistent with established trends with the possible exception of vanadium. The most recent result for vanadium showed an increase over recent values. Vanadium concentrations at RFN-0195 and other locations will continue to be evaluated in the future to determine the potential for deviations from established trends. The surface water locations were sampled to monitor the impact of groundwater discharge. COC concentrations at Colorado River surface water locations RFN-0324 and RFN-0326, downgradient of the site, remained low and were consistent with historical results, as shown in the time-concentration graphs. COC concentrations did not indicate there are any impacts related to groundwater discharge to the river. In many cases, elevated COC concentrations at the New Rifle site pond locations were observed, as shown in the time-versus concentration graphs. As noted in the GCAP, this indicates impacts from groundwater discharge to the ponds. Old Rifle Site Samples were collected at the Old Rifle site from eight monitoring wells and five surface locations in compliance with the December 2001 Groundwater Compliance Action Plan for the Old Rifle, Colorado, UMTRA Project Site (GJ0-2000-177-TAR). Analytes measured at the Old Rifle site included COCs (selenium, uranium, and vanadium), major cations, and major anions. Field measurements of total alkalinity, oxidation-reduction potential, pH, specific conductance, turbidity, temperature, were made at each location, and the water level was measured at each sampled well. The monitoring strategy described in the GCAP is designed to determine progress of the natural flushing process in meeting compliance standards for site COCs. Standards for selenium and vanadium are the proposed ACLs of0.05 mg/L and 1.0 mg/L, respectively. For uranium the cleanup goal is the UMTRA standard of 0.044 mg/L or background, whichever is higher. As shown in the time concentration graphs, the uranium concentration exceeds the cleanup goal at groundwater monitoring locations RF0-0304, -0305, -0310, -0655, and -0656. The surface water locations were sampled to monitor the impact of groundwater discharge at Colorado River surface water locations adjacent to (RF0-0396) and downgradient of the site (RF0-0741). COC concentrations remain low and consistent with historical concentrations as shown in the time-concentration graphs (Attachment 2), which indicate no impacts from groundwater discharge to the river.« less

  6. Environmental assessment of remedial action at the Gunnison Uranium Mill Tailings Site, Gunnison, Colorado. [UMTRA Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bachrach, A.; Hoopes, J.; Morycz, D.

    1984-12-01

    This document assesses and compares the environmental impacts of various alternatives for remedial action at the Gunnison uranium of mill tailings site located 0.5 miles south of Gunnison, Colorado. The site covers 56 acres and contains 35 acres of tailings, 2 of the original mill buildings and a water tower. The Uranium Mill Tailings Radiation Control of Act of 1978 (UMTRCA), Public Law 95-604, authorizes the US Department of Energy to clean up the site to reduce the potential health impacts associated with the residual radioactive materials remaining at the site and at associated (vicinity) properties off the site. Themore » US Environmental Protection Agency promulgated standards for the remedial actions (40 CFR 192). Remedial actions must be performed in accordance with these standards and with the occurrence of the Nuclear Regulatory Commission. Four alternatives have been addressed in this document. The first alternative is to consolidate the tailings and associated contaminated soils into a recontoured pile on the southern portion of the existing site. A radon barrier of silty clay would be constructed over the pile and various erosion control measures would be taken to assure the long-term integrity of the pile. Two other alternatives which involve moving the tailings to new locations are assessed in this document. These alternatives generally involve greater short-term impacts and are more costly but would result in the tailings being stabilized in a location farther from the city of Gunnison. The no action alternative is also assessed.« less

  7. In-Well Sediment Incubators to Evaluate Microbial Community Stability and Dynamics following Bioimmobilization of Uranium

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Baldwin, Brett R.; Peacock, Aaron D.; Gan, M.

    2009-09-23

    An in-situ incubation device (ISI) was developed in order to investigate the stability and dynamics of sediment associated microbial communities to prevailing subsurface oxidizing or reducing conditions. Here we describe the use of these devices at the Old Rifle Uranium Mill Tailings Remedial Action (UMTRA) site. During the 7 month deployment oxidized Rifle aquifer background sediments (RABS) were deployed in previously biostimulated wells under iron reducing conditions, cell densities of known iron reducing bacteria including Geobacteraceae increased significantly showing the microbial community response to local subsurface conditions. PLFA profiles of RABS following in situ deployment were strikingly similar to thosemore » of adjacent sediment cores suggesting ISI results could be extrapolated to the native material of the test plots. Results for ISI deployed reduced sediments showed only slight changes in community composition and pointed toward the ability of the ISIs to monitor microbial community stability and response to subsurface conditions.« less

  8. 1997 Monitoring report for the Gunnison, Colorado Wetlands Mitigation Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-11-01

    Under the Uranium Mill Tailings Remedial Action (UMTRA) Project, the U.S. Department of Energy (DOE) cleaned up uranium mill tailings and other surface contamination near the town of Gunnison, Colorado. Remedial action resulted in the elimination of 4.3 acres (ac) (1.7 hectares [ha]) of wetlands. This loss is mitigated by the enhancement of six spring-fed areas on Bureau of Land Management (BLM) land (mitigation sites). Approximately 254 ac (1 03.3 ha) were fenced at the six sites to exclude grazing livestock. Of the 254 ac (103.3 ha), 17.8 ac (7.2 ha) are riparian plant communities; the rest are sagebrush communities.more » Baseline grazed conditions of the riparian plant communities at the mitigation sites were measured prior to fencing. This report discusses results of the fourth year of a monitoring program implemented to document the response of vegetation and wildlife to the exclusion of livestock. Three criteria for determining success of the mitigation were established: plant height, vegetation density (bare ground), and vegetation diversity. By 1996, Prospector Spring, Upper Long`s Gulch, and Camp Kettle met the criteria. The DOE requested transfer of these sites to BLM for long-term oversight. The 1997 evaluation of the three remaining sites, discussed in this report, showed two sites (Houston Gulch and Lower Long`s Gulch) meet the criteria. The DOE will request the transfer of these two sites to the BLM for long-term oversight. The last remaining site, Sage Hen Spring, has met only two of the criteria (percent bare ground and plant height). The third criterion, vegetation diversity, was not met. The vegetation appears to be changing from predominantly wet species to drier upland species, although the reason for this change is uncertain. It may be due to below-normal precipitation in recent years, diversion of water from the spring to the stock tank, or manipulation of the hydrology farther up gradient.« less

  9. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    The groundwater compliance strategy for the Tuba City, Arizona, Disposal Site is defined in the 1999 Phase I Ground Water Compliance Action Plan for the Tuba City, Arizona, UMTRA Site. Samples are collected and analyzed on a semiannual basis to evaluate the performance of the Phase I remediation system. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). U.S. Environmental Protection Agency (EPA) groundwater standards were exceeded in samples collected from monitoring wells as listed in Table 1. The data from this sampling eventmore » are generally consistent with previously obtained values and are acceptable for general use as qualified. Data anomalies are not significant with respect to the known nature and extent of contamination and progress of remedial action at the site. The data from this sampling event will be incorporated into the annual performance evaluation report that will present a comprehensive hydrologic summary and evaluation of groundwater remedial action performance at the Tuba City site through March 2016.« less

  10. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bush, Richard; Lemke, Peter

    The groundwater compliance strategy for the Tuba City, Arizona, Disposal Site is defined in the 1999 Phase I Ground Water Compliance Action Plan for the Tuba City, Arizona, UMTRA Site. Samples are collected and analyzed on a semiannual basis to evaluate the performance of the Phase I remediation system. Sampling and analyses were conducted as specified in Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated). U.S. Environmental Protection Agency (EPA) groundwater standards were exceeded in samples collected from monitoring wells and extraction wells as listed in Table 1. The data frommore » this sampling event are generally consistent with previously obtained values and are acceptable for general use as qualified. Data anomalies are not significant with respect to the known nature and extent of contamination and progress of remedial action at the site. The data from this sampling event will be incorporated into the annual performance evaluation report that will present a comprehensive hydrologic summary and evaluation of groundwater remedial action performance at the Tuba City site through March 2016.« less

  11. Health and Safety Research Division: Progress report, October 1, 1985-March 31, 1987

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Walsh, P.J.

    1987-09-01

    This report summarizes the progress in our programs for the period October 1, 1985, through March 31, 1987. The division's presentations and publications represented important contributions on the forefronts of many fields. Eleven invention disclosures were filed, two patent applications submitted, and one patent issued. The company's transfers new technologies to the private sector more efficiently than in the past. The division's responsibilities to DOE under the Uranium Mill Tailings Remedial Action (UMTRA) program includes inclusion recommendations for 3100 properties. The nuclear medicine program developed new radiopharmaceuticals and radionuclide generators through clinical trials with some of our medical cooperatives. Twomore » major collaborative indoor air quality studies and a large epidemiological study of drinking water quality and human health were completed. ORNL's first scanning tunneling microscope (STM) has achieved single atom resolution and has produced some of the world's best images of single atoms on the surface of a silicon crystal. The Biological and Radiation Physics Section, designed and constructed a soft x-ray spectrometer which has exhibited a measuring efficiency that is 10,000 times higher than other equipment. 1164 refs.« less

  12. NABIR Assessment Element, Expanded Rapid, Comprehensive, Lipid Biomarker Analysis for Subsurface, Community Composition and Nutritional/Physiological Status as Monitors of Remediation and Detoxification Effectiveness

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    David C. White

    2005-09-14

    NABIR funding at the University of Tennessee Center for Biomarker Analysis (CBA) has led to several key contributions to the investigation of bioremediation of metals and radionuclides. This lab has played an integral part in assessing microbial communities at the field scale at the ORNL FRC (Istok et al., 2004) and two UMTRA sites (Anderson et al., 2003, Chang et al., 2001). Our work over the period of the grant has resulted in 42-peer reviewed publications, 62 presentations (14 of which were international), and one patent pending. Currently CBA has 2 papers in press. The main objectives relating to themore » field portion of this program were to provide comprehensive biomarker analysis for NABIR collaborators to enhance the understanding of microbial geo-bioprocesses involved in the effective immobilization of metals (We have worked with and published or currently are publishing with 10 groups of NAIBR investigators). The laboratory portion of our research centered on methods development and has led to three major innovations that could result in a systematic way of evaluating sites for potential bioremediation. The first of these is the development of an in situ sampling device (Peacock et al., 2004, Anderson et al., 2003, Istok et al., 2004) for the collection and concentration of microbial biomass. The second is the development of expanded lipid analysis based on the significantly greater sensitivity and selectivity of the LC/MS/MS that allows the analysis of respiratory quinones, diglycerides, sterols, intact phospholipids, poly-hydroxyalkonates, and potentially archaeol, and caldarchaeols from archea. These new analyses are accomplished more rapidly and with increased sensitivities and resolution than in the past (Lytle et al., 2000a, 2000b, 2001a, Geyer et al., 2004). The third advance is the coupling of lipid analysis with 13C enrichment experiments (Lytle et al., 2001b, Geyer et al. 2005). With this technique it is now possible to follow the active portion of the in situ microbial community with a resolution heretofore not possible. These three advances in technology have been initially demonstrated at the NABIR Field Research Center (FRC) in Oak Ridge, TN and at the UMTRA Old Rifle site in Colorado. Microbial communities are of primary importance in the use of bioimmobilization strategies for metals and radionuclides from contaminated groundwater and sediments. These communities represent a potentially transformable agent that is able to affect virtually all biogeochemical pathways. Microorganisms can alter metal chemistry and mobility through reduction, accumulation, and immobilization and have been shown to be responsible for mineral formation and dissolution. Research is directed to provide collaborating NABIR investigators a rapid, comprehensive, and cost-effective suite of biomarker measurements to quantify microbial community structure, activity, and effectiveness, thereby providing defensible evidence that a desired bioprocess is occurring or may occur at a given site.« less

  13. The use of process mapping in healthcare quality improvement projects.

    PubMed

    Antonacci, Grazia; Reed, Julie E; Lennox, Laura; Barlow, James

    2018-05-01

    Introduction Process mapping provides insight into systems and processes in which improvement interventions are introduced and is seen as useful in healthcare quality improvement projects. There is little empirical evidence on the use of process mapping in healthcare practice. This study advances understanding of the benefits and success factors of process mapping within quality improvement projects. Methods Eight quality improvement projects were purposively selected from different healthcare settings within the UK's National Health Service. Data were gathered from multiple data-sources, including interviews exploring participants' experience of using process mapping in their projects and perceptions of benefits and challenges related to its use. These were analysed using inductive analysis. Results Eight key benefits related to process mapping use were reported by participants (gathering a shared understanding of the reality; identifying improvement opportunities; engaging stakeholders in the project; defining project's objectives; monitoring project progress; learning; increased empathy; simplicity of the method) and five factors related to successful process mapping exercises (simple and appropriate visual representation, information gathered from multiple stakeholders, facilitator's experience and soft skills, basic training, iterative use of process mapping throughout the project). Conclusions Findings highlight benefits and versatility of process mapping and provide practical suggestions to improve its use in practice.

  14. Biogeochemical aspects of uranium mineralization, mining, milling, and remediation

    USGS Publications Warehouse

    Campbell, Kate M.; Gallegos, Tanya J.; Landa, Edward R.

    2015-01-01

    Natural uranium (U) occurs as a mixture of three radioactive isotopes: 238U, 235U, and 234U. Only 235U is fissionable and makes up about 0.7% of natural U, while 238U is overwhelmingly the most abundant at greater than 99% of the total mass of U. Prior to the 1940s, U was predominantly used as a coloring agent, and U-bearing ores were mined mainly for their radium (Ra) and/or vanadium (V) content; the bulk of the U was discarded with the tailings (Finch et al., 1972). Once nuclear fission was discovered, the economic importance of U increased greatly. The mining and milling of U-bearing ores is the first step in the nuclear fuel cycle, and the contact of residual waste with natural water is a potential source of contamination of U and associated elements to the environment. Uranium is mined by three basic methods: surface (open pit), underground, and solution mining (in situ leaching or in situ recovery), depending on the deposit grade, size, location, geology and economic considerations (Abdelouas, 2006). Solid wastes at U mill tailings (UMT) sites can include both standard tailings (i.e., leached ore rock residues) and solids generated on site by waste treatment processes. The latter can include sludge or “mud” from neutralization of acidic mine/mill effluents, containing Fe and a range of coprecipitated constituents, or barium sulfate precipitates that selectively remove Ra (e.g., Carvalho et al., 2007). In this chapter, we review the hydrometallurgical processes by which U is extracted from ore, the biogeochemical processes that can affect the fate and transport of U and associated elements in the environment, and possible remediation strategies for site closure and aquifer restoration.This paper represents the fourth in a series of review papers from the U.S. Geological Survey (USGS) on geochemical aspects of UMT management that span more than three decades. The first paper (Landa, 1980) in this series is a primer on the nature of tailings and radionuclide mobilization from them. The second paper (Landa, 1999) includes coverage of research carried out under the U.S. Department of Energy’s Uranium Mill Tailings Remedial Action Program (UMTRA). The third paper (Landa, 2004) reflects the increased focus of researchers on biotic effects in UMT environs. This paper expands the focus to U mining, milling, and remedial actions, and includes extensive coverage of the increasingly important alkaline in situ recovery and groundwater restoration.

  15. Information Technology Project Processes: Understanding the Barriers to Improvement and Adoption

    ERIC Educational Resources Information Center

    Williams, Bernard L.

    2009-01-01

    Every year, organizations lose millions of dollars due to IT (Information Technology) project failures. Over time, organizations have developed processes and procedures to help reduce the incidence of challenged IT projects. Research has shown that IT project processes can work to help reduce the number of challenged projects. The research in this…

  16. A functional-dynamic reflection on participatory processes in modeling projects.

    PubMed

    Seidl, Roman

    2015-12-01

    The participation of nonscientists in modeling projects/studies is increasingly employed to fulfill different functions. However, it is not well investigated if and how explicitly these functions and the dynamics of a participatory process are reflected by modeling projects in particular. In this review study, I explore participatory modeling projects from a functional-dynamic process perspective. The main differences among projects relate to the functions of participation-most often, more than one per project can be identified, along with the degree of explicit reflection (i.e., awareness and anticipation) on the dynamic process perspective. Moreover, two main approaches are revealed: participatory modeling covering diverse approaches and companion modeling. It becomes apparent that the degree of reflection on the participatory process itself is not always explicit and perfectly visible in the descriptions of the modeling projects. Thus, the use of common protocols or templates is discussed to facilitate project planning, as well as the publication of project results. A generic template may help, not in providing details of a project or model development, but in explicitly reflecting on the participatory process. It can serve to systematize the particular project's approach to stakeholder collaboration, and thus quality management.

  17. 76 FR 77892 - Open Meeting of the Taxpayer Advocacy Panel Refund Processing Communications Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ... Refund Processing Communications Project Committee AGENCY: Internal Revenue Service (IRS) Treasury... Communications Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments... the Taxpayer Advocacy Panel Refund Processing Communications Project Committee will be held Tuesday...

  18. Analysis of architect’s performance indicators in project delivery process

    NASA Astrophysics Data System (ADS)

    Marisa, A.

    2018-03-01

    Architect as a professional in the construction industry should possess a good performance in project delivery process. As a design professional, architect has an important role to ensure that the process is well-conducted by delivering a high-quality product for the clients. Thus, analyzing architect’s performance indicators is crucial in the project delivery process. This study aims to analyze the relative importance of architect performance indicators in project delivery process among registered architects in North Sumatera, Indonesia. A total of five indicators that measure architect performance in project delivery process were identified and 110 completed questionnaires were obtained and used for data analysis. A relative importance index is used to rank the relative importance of architect performance indicators. Results indicate that focus on the clients is the most important indicator of architect performance in project delivery process. This study demonstrates project communication as one of crucial indicators perceived by the architects for measuring their performance, and fills a knowledge gap on the importance of identifying the most important indicator for measuring architect performance from their own perspectives which previous studies have overlooked to improve performance assessment in project delivery process.

  19. 77 FR 61053 - Open Meeting of the Taxpayer Advocacy Panel Refund Processing Communications Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... Refund Processing Communications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury... Communications Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments... Advocacy Panel Refund Processing Communications Project Committee will be held Thursday, November 1, 2012...

  20. 77 FR 2610 - Open Meeting of the Taxpayer Advocacy Panel Refund Processing Communications Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... Refund Processing Communications Project Committee AGENCY: Internal Revenue Service (IRS) Treasury... Communications Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments... Advocacy Panel Refund Processing Communications Project Committee will be held Thursday, February 2, 2012...

  1. 77 FR 8327 - Open Meeting of the Taxpayer Advocacy Panel Refund Processing Communications Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... Refund Processing Communications Project Committee AGENCY: Internal Revenue Service (IRS) Treasury... Communications Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments... Taxpayer Advocacy Panel Refund Processing Communications Project Committee will be held Thursday, March 01...

  2. 77 FR 47165 - Open Meeting of the Taxpayer Advocacy Panel Refund Processing Communications Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-07

    ... Refund Processing Communications Project Committee AGENCY: Internal Revenue Service (IRS) Treasury... Communications Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments... Advocacy Panel Refund Processing Communications Project Committee will be held Thursday, September 6, 2012...

  3. 77 FR 55526 - Open Meeting of the Taxpayer Advocacy Panel Refund Processing Communications Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-10

    ... Refund Processing Communications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury... Communications Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments... Panel Refund Processing Communications Project Committee will be held Thursday, October 4, 2012 at 2 p.m...

  4. 77 FR 21158 - Open Meeting of the Taxpayer Advocacy Panel Refund Processing Communications Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-09

    ... Refund Processing Communications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury... Communications Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments... Refund Processing Communications Project Committee will be held Thursday, May 03, 2012 at 2 p.m. Eastern...

  5. 77 FR 40410 - Open Meeting of the Taxpayer Advocacy Panel Refund Processing Communications Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-09

    ... Refund Processing Communications Project Committee AGENCY: Internal Revenue Service (IRS), Treasury... Communications Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments... Panel Refund Processing Communications Project Committee will be held Thursday, August 2, 2012 at 2:00 p...

  6. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    NASA Astrophysics Data System (ADS)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  7. Risk Quantification of Systems Engineering Documents Improves Probability of DOD Project Success

    DTIC Science & Technology

    2009-09-01

    comprehensive risk model for DoD milestone review documentation as well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project...Milestone Documentation, Project Planning, Rational Frame, Political Frame, CMMI Project Planning Process Area, CMMI Risk Management Process Area...well as recommended changes to the Capability Maturity Model Integration ( CMMI ) Project Planning and Risk Management process areas. The intent is to

  8. 77 FR 47705 - Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... Return Processing Delays Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION... Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and... Processing Delays Project Committee will be held Tuesday, September 04, 2012, at 9:30 a.m. Pacific Time via...

  9. 77 FR 2611 - Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-18

    ... Return Processing Delays Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION... Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and... Processing Delays Project Committee will be held Tuesday, February 7, 2012, at 9:30 a.m. Pacific Time via...

  10. [Analysis of projects funded by NSFC in field of processing Chinese materia medica in recent five years].

    PubMed

    Chen, Lei; Xia, Xing; He, Bo-sai; Hah, Li-wei

    2015-05-01

    The general situation of the approved and concluded projects of National Natural Science Foundation of China in the field of processing Chinese Materia Medica in recent five years has been reviewed. The progresses and achievements of some projects have been summarized in accordance with research area such as the processing principle, the processing technology, quality evaluation, toxicity and safety evaluation, etc. The researchers and project support units of the funded projects have been analyzed, and the problems of the applications have been also summarized.

  11. Finance and supply management project execution plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    BENNION, S.I.

    As a subproject of the HANDI 2000 project, the Finance and Supply Management system is intended to serve FDH and Project Hanford major subcontractor with financial processes including general ledger, project costing, budgeting, and accounts payable, and supply management process including purchasing, inventory and contracts management. Currently these functions are performed with numerous legacy information systems and suboptimized processes.

  12. Strategic Project Management at the NASA Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Lavelle, Jerome P.

    2000-01-01

    This paper describes Project Management at NASA's Kennedy Space Center (KSC) from a strategic perspective. It develops the historical context of the agency and center's strategic planning process and illustrates how now is the time for KSC to become a center which has excellence in project management. The author describes project management activities at the center and details observations on those efforts. Finally the author describes the Strategic Project Management Process Model as a conceptual model which could assist KSC in defining an appropriate project management process system at the center.

  13. Materials Processing in Space (MPS) program description

    NASA Technical Reports Server (NTRS)

    1981-01-01

    Insight is provided into the scientific rotationale for materials processing in space (MPS), and a comprehensive and cohesive approach for implementation and integration of the many, diverse aspects of MPS is described. The programmatic and management functions apply to all projects and activities implemented under MPS. It is intended that specific project plans, providing project unique details, will be appended to this document for endeavors such as the Space Processing Applications Rocket (SPAR) Project, the Materials Experiment Assembly (MEA) Project, the MPS/Spacelab (MPS/SL) Project, and the Materials Experiment Carrier (MEC) Payloads.

  14. Use of GIS technologies to facilitate the transportation project programming process.

    DOT National Transportation Integrated Search

    2008-05-01

    Transportation project programming in a transportation agency is a process of matching : potential projects with available funds to accomplish the agencys mission and goals of a : given period of time. Result of this process is normally a transpor...

  15. 36 CFR 218.3 - Authorized hazardous fuel reduction projects subject to objection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE PREDECISIONAL ADMINISTRATIVE REVIEW PROCESSES Predecisional Administrative Review Process for Hazardous Fuel Reduction Projects Authorized by the Healthy Forests Restoration..., the objection process of this part applies to both the plan amendment and the project. ...

  16. Political polarization projection: social projection of partisan attitude extremity and attitudinal processes.

    PubMed

    Van Boven, Leaf; Judd, Charles M; Sherman, David K

    2012-07-01

    What influences perceptions of political polarization? The authors examine the polarization of people's own political attitudes as a source of perceived polarization: Individuals with more extreme partisan attitudes perceive greater polarization than individuals with less extreme partisan attitudes. This "polarization projection" was demonstrated in 3 studies in which people estimated the distribution of others' political attitudes: one study with a nationally representative sample concerning the 2008 presidential election, and 2 studies concerning university students evaluating a policy regarding scarce resource allocation. These studies demonstrate that polarization projection occurs simultaneously with and independently of simple projection, the tendency to assume that others share one's partisan political attitudes. Polarization projection may occur partly because people assume that others engage in similar attitudinal processes as the self, such as extensive thought and emotional arousal. The projection of various attitudinal processes was demonstrated in a study concerning health care reform policies. Further supporting this explanation, polarization projection increased when people introspected about their own attitudinal processes, which increased the accessibility of those processes. Implications for perceptions of partisanship, social judgment, and civic behavior are discussed.

  17. Quantitative CMMI Assessment for Offshoring through the Analysis of Project Management Repositories

    NASA Astrophysics Data System (ADS)

    Sunetnanta, Thanwadee; Nobprapai, Ni-On; Gotel, Olly

    The nature of distributed teams and the existence of multiple sites in offshore software development projects pose a challenging setting for software process improvement. Often, the improvement and appraisal of software processes is achieved through a turnkey solution where best practices are imposed or transferred from a company’s headquarters to its offshore units. In so doing, successful project health checks and monitoring for quality on software processes requires strong project management skills, well-built onshore-offshore coordination, and often needs regular onsite visits by software process improvement consultants from the headquarters’ team. This paper focuses on software process improvement as guided by the Capability Maturity Model Integration (CMMI) and proposes a model to evaluate the status of such improvement efforts in the context of distributed multi-site projects without some of this overhead. The paper discusses the application of quantitative CMMI assessment through the collection and analysis of project data gathered directly from project repositories to facilitate CMMI implementation and reduce the cost of such implementation for offshore-outsourced software development projects. We exemplify this approach to quantitative CMMI assessment through the analysis of project management data and discuss the future directions of this work in progress.

  18. Project Management, Critical Praxis, and Process-Oriented Approach to Teamwork

    ERIC Educational Resources Information Center

    Ding, Huiling; Ding, Xin

    2008-01-01

    To help alleviate issues of free-riding and conflicts in team projects, this study proposes the systematic incorporation of project management methods to introduce a process-oriented approach to and a critical praxis in team projects. We examined how the systematic use of project management methods influenced students' performance in team…

  19. 76 FR 42122 - Ocean Renewable Power Company, LLC; Notice Concluding Pre-Filing Process and Approving Process...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12711-003] Ocean Renewable.... e. Name of Project: Cobscook Bay Tidal Energy Project. f. Location: In Cobscook Bay, in Washington... a two-phased development approach for the Cobscook Bay Tidal Energy Project. The project would...

  20. 36 CFR 218.2 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... ADMINISTRATIVE REVIEW PROCESSES Predecisional Administrative Review Process for Hazardous Fuel Reduction Projects... reduction project: A hazardous fuel reduction project authorized by the Healthy Forests Restoration Act of... reduction project pursuant to the HFRA. Decision notice (DN): A concise written record of a responsible...

  1. Reengineering the Project Design Process

    NASA Technical Reports Server (NTRS)

    Casani, E.; Metzger, R.

    1994-01-01

    In response to NASA's goal of working faster, better and cheaper, JPL has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center and the Flight System Testbed. Reengineering at JPL implies a cultural change whereby the character of its design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and cost estimating.

  2. Project management process.

    DOT National Transportation Integrated Search

    2007-03-01

    This course provides INDOT staff with foundational knowledge and skills in project management principles and methodologies. INDOTs project management processes provide the tools for interdisciplinary teams to efficiently and effectively deliver pr...

  3. Process Acceptance and Adoption by IT Software Project Practitioners

    ERIC Educational Resources Information Center

    Guardado, Deana R.

    2012-01-01

    This study addresses the question of what factors determine acceptance and adoption of processes in the context of Information Technology (IT) software development projects. This specific context was selected because processes required for managing software development projects are less prescriptive than in other, more straightforward, IT…

  4. Flat-plate solar array project. Volume 5: Process development

    NASA Technical Reports Server (NTRS)

    Gallagher, B.; Alexander, P.; Burger, D.

    1986-01-01

    The goal of the Process Development Area, as part of the Flat-Plate Solar Array (FSA) Project, was to develop and demonstrate solar cell fabrication and module assembly process technologies required to meet the cost, lifetime, production capacity, and performance goals of the FSA Project. R&D efforts expended by Government, Industry, and Universities in developing processes capable of meeting the projects goals during volume production conditions are summarized. The cost goals allocated for processing were demonstrated by small volume quantities that were extrapolated by cost analysis to large volume production. To provide proper focus and coverage of the process development effort, four separate technology sections are discussed: surface preparation, junction formation, metallization, and module assembly.

  5. Manufacturing Methods and Technology Project Summary Reports

    DTIC Science & Technology

    1985-06-01

    Computer -Aided Design (CAD)/ Computer -Aided Manufacturing (CAM) Process for the Production of Cold Forged Gears Project 483 6121 - Robotic Welding and...Caliber Projectile Bodies Project 682 8370 - Automatic Inspection and 1-I1 Process Control of Weapons Parts Manufacturing METALS Project 181 7285 - Cast...designed for use on each project. Experience suggested that a general purpose computer interface might be designed that could be used on any project

  6. Generic project definitions for improvement of health care delivery: a case-based approach.

    PubMed

    Niemeijer, Gerard C; Does, Ronald J M M; de Mast, Jeroen; Trip, Albert; van den Heuvel, Jaap

    2011-01-01

    The purpose of this article is to create actionable knowledge, making the definition of process improvement projects in health care delivery more effective. This study is a retrospective analysis of process improvement projects in hospitals, facilitating a case-based reasoning approach to project definition. Data sources were project documentation and hospital-performance statistics of 271 Lean Six Sigma health care projects from 2002 to 2009 of general, teaching, and academic hospitals in the Netherlands and Belgium. Objectives and operational definitions of improvement projects in the sample, analyzed and structured in a uniform format and terminology. Extraction of reusable elements of earlier project definitions, presented in the form of 9 templates called generic project definitions. These templates function as exemplars for future process improvement projects, making the selection, definition, and operationalization of similar projects more efficient. Each template includes an explicated rationale, an operationalization in the form of metrics, and a prototypical example. Thus, a process of incremental and sustained learning based on case-based reasoning is facilitated. The quality of project definitions is a crucial success factor in pursuits to improve health care delivery. We offer 9 tried and tested improvement themes related to patient safety, patient satisfaction, and business-economic performance of hospitals.

  7. Project development process.

    DOT National Transportation Integrated Search

    2007-08-01

    The following chapter explains the purpose of this document, outlines the essential elements involved in : the Project Development Process, describes the differences in the three main project classifications, and : provides the necessary background i...

  8. Issues in NASA Program and Project Management. Special Edition: A Collection of Papers on NASA Procedures and Guidance 7120.5A. Volume 14

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1998-01-01

    A key aspect of NASA's new Strategic Management System is improving the way we plan, approve, execute and evaluate our programs and projects. To this end, NASA has developed the NASA Program and Project Management processes and Requirements-NASA Procedures and Guidelines (NPG) 7120.5A, which formally documents the "Provide Aerospace Products and Capabilities" crosscutting process, and defines the processes and requirements that are responsive to the Program/Project Management-NPD 7120.4A. The Program/Project Management-NPD 7120.4A, issued November 14, 1996, provides the policy for managing programs and projects in a new way that is aligned with the new NASA environment. An Agencywide team has spent thousands of hours developing the NASA Program and Project Management Processes and Requirements-NPG 7120.5A. We have created significant flexibility, authority and discretion for the program and project managers to exercise and carry out their duties, and have delegated the responsibility and the accountability for their programs and projects.

  9. Computer Aided Management for Information Processing Projects.

    ERIC Educational Resources Information Center

    Akman, Ibrahim; Kocamustafaogullari, Kemal

    1995-01-01

    Outlines the nature of information processing projects and discusses some project management programming packages. Describes an in-house interface program developed to utilize a selected project management package (TIMELINE) by using Oracle Data Base Management System tools and Pascal programming language for the management of information system…

  10. Impact of agile methodologies on team capacity in automotive radio-navigation projects

    NASA Astrophysics Data System (ADS)

    Prostean, G.; Hutanu, A.; Volker, S.

    2017-01-01

    The development processes used in automotive radio-navigation projects are constantly under adaption pressure. While the software development models are based on automotive production processes, the integration of peripheral components into an automotive system will trigger a high number of requirement modifications. The use of traditional development models in automotive industry will bring team’s development capacity to its boundaries. The root cause lays in the inflexibility of actual processes and their adaption limits. This paper addresses a new project management approach for the development of radio-navigation projects. The understanding of weaknesses of current used models helped us in development and integration of agile methodologies in traditional development model structure. In the first part we focus on the change management methods to reduce request for change inflow. Established change management risk analysis processes enables the project management to judge the impact of a requirement change and also gives time to the project to implement some changes. However, in big automotive radio-navigation projects the saved time is not enough to implement the large amount of changes, which are submitted to the project. In the second phase of this paper we focus on increasing team capacity by integrating at critical project phases agile methodologies into the used traditional model. The overall objective of this paper is to prove the need of process adaption in order to solve project team capacity bottlenecks.

  11. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  12. Rationale, design, and methods for process evaluation in the Childhood Obesity Research Demonstration project

    USDA-ARS?s Scientific Manuscript database

    The cross-site process evaluation plan for the Childhood Obesity Research Demonstration (CORD) project is described here. The CORD project comprises 3 unique demonstration projects designed to integrate multi-level, multi-setting health care and public health interventions over a 4-year funding peri...

  13. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  14. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... figure 1 in appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  15. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  16. 33 CFR 385.11 - Implementation process for projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... figure 1 in Appendix A of this part. Typical steps in this process involve: (a) Project Management Plan. The Project Management Plan describes the activities, tasks, and responsibilities that will be used to... effectiveness of the project and to provide information that will be used for the adaptive management program. ...

  17. A contrast between DEMATEL-ANP and ANP methods for six sigma project selection: a case study in healthcare industry.

    PubMed

    Ortíz, Miguel A; Felizzola, Heriberto A; Nieto Isaza, Santiago

    2015-01-01

    The project selection process is a crucial step for healthcare organizations at the moment of implementing six sigma programs in both administrative and caring processes. However, six-sigma project selection is often defined as a decision making process with interaction and feedback between criteria; so that it is necessary to explore different methods to help healthcare companies to determine the Six-sigma projects that provide the maximum benefits. This paper describes the application of both ANP (Analytic Network process) and DEMATEL (Decision Making trial and evaluation laboratory)-ANP in a public medical centre to establish the most suitable six sigma project and finally, these methods were compared to evaluate their performance in the decision making process. ANP and DEMATEL-ANP were used to evaluate 6 six sigma project alternatives under an evaluation model composed by 3 strategies, 4 criteria and 15 sub-criteria. Judgement matrixes were completed by the six sigma team whose participants worked in different departments of the medical centre. The improving of care opportunity in obstetric outpatients was elected as the most suitable six sigma project with a score of 0,117 as contribution to the organization goals. DEMATEL-ANP performed better at decision making process since it reduced the error probability due to interactions and feedback. ANP and DEMATEL-ANP effectively supported six sigma project selection processes, helping to create a complete framework that guarantees the prioritization of projects that provide maximum benefits to healthcare organizations. As DEMATEL- ANP performed better, it should be used by practitioners involved in decisions related to the implementation of six sigma programs in healthcare sector accompanied by the adequate identification of the evaluation criteria that support the decision making model. Thus, this comparative study contributes to choosing more effective approaches in this field. Suggestions of further work are also proposed so that these methods can be applied more adequate in six sigma project selection processes in healthcare.

  18. A contrast between DEMATEL-ANP and ANP methods for six sigma project selection: a case study in healthcare industry

    PubMed Central

    2015-01-01

    Background The project selection process is a crucial step for healthcare organizations at the moment of implementing six sigma programs in both administrative and caring processes. However, six-sigma project selection is often defined as a decision making process with interaction and feedback between criteria; so that it is necessary to explore different methods to help healthcare companies to determine the Six-sigma projects that provide the maximum benefits. This paper describes the application of both ANP (Analytic Network process) and DEMATEL (Decision Making trial and evaluation laboratory)-ANP in a public medical centre to establish the most suitable six sigma project and finally, these methods were compared to evaluate their performance in the decision making process. Methods ANP and DEMATEL-ANP were used to evaluate 6 six sigma project alternatives under an evaluation model composed by 3 strategies, 4 criteria and 15 sub-criteria. Judgement matrixes were completed by the six sigma team whose participants worked in different departments of the medical centre. Results The improving of care opportunity in obstetric outpatients was elected as the most suitable six sigma project with a score of 0,117 as contribution to the organization goals. DEMATEL-ANP performed better at decision making process since it reduced the error probability due to interactions and feedback. Conclusions ANP and DEMATEL-ANP effectively supported six sigma project selection processes, helping to create a complete framework that guarantees the prioritization of projects that provide maximum benefits to healthcare organizations. As DEMATEL- ANP performed better, it should be used by practitioners involved in decisions related to the implementation of six sigma programs in healthcare sector accompanied by the adequate identification of the evaluation criteria that support the decision making model. Thus, this comparative study contributes to choosing more effective approaches in this field. Suggestions of further work are also proposed so that these methods can be applied more adequate in six sigma project selection processes in healthcare. PMID:26391445

  19. Advanced processing for high-bandwidth sensor systems

    NASA Astrophysics Data System (ADS)

    Szymanski, John J.; Blain, Phil C.; Bloch, Jeffrey J.; Brislawn, Christopher M.; Brumby, Steven P.; Cafferty, Maureen M.; Dunham, Mark E.; Frigo, Janette R.; Gokhale, Maya; Harvey, Neal R.; Kenyon, Garrett; Kim, Won-Ha; Layne, J.; Lavenier, Dominique D.; McCabe, Kevin P.; Mitchell, Melanie; Moore, Kurt R.; Perkins, Simon J.; Porter, Reid B.; Robinson, S.; Salazar, Alfonso; Theiler, James P.; Young, Aaron C.

    2000-11-01

    Compute performance and algorithm design are key problems of image processing and scientific computing in general. For example, imaging spectrometers are capable of producing data in hundreds of spectral bands with millions of pixels. These data sets show great promise for remote sensing applications, but require new and computationally intensive processing. The goal of the Deployable Adaptive Processing Systems (DAPS) project at Los Alamos National Laboratory is to develop advanced processing hardware and algorithms for high-bandwidth sensor applications. The project has produced electronics for processing multi- and hyper-spectral sensor data, as well as LIDAR data, while employing processing elements using a variety of technologies. The project team is currently working on reconfigurable computing technology and advanced feature extraction techniques, with an emphasis on their application to image and RF signal processing. This paper presents reconfigurable computing technology and advanced feature extraction algorithm work and their application to multi- and hyperspectral image processing. Related projects on genetic algorithms as applied to image processing will be introduced, as will the collaboration between the DAPS project and the DARPA Adaptive Computing Systems program. Further details are presented in other talks during this conference and in other conferences taking place during this symposium.

  20. Integrated Risk Management Within NASA Programs/Projects

    NASA Technical Reports Server (NTRS)

    Connley, Warren; Rad, Adrian; Botzum, Stephen

    2004-01-01

    As NASA Project Risk Management activities continue to evolve, the need to successfully integrate risk management processes across the life cycle, between functional disciplines, stakeholders, various management policies, and within cost, schedule and performance requirements/constraints become more evident and important. Today's programs and projects are complex undertakings that include a myriad of processes, tools, techniques, management arrangements and other variables all of which must function together in order to achieve mission success. The perception and impact of risk may vary significantly among stakeholders and may influence decisions that may have unintended consequences on the project during a future phase of the life cycle. In these cases, risks may be unintentionally and/or arbitrarily transferred to others without the benefit of a comprehensive systemic risk assessment. Integrating risk across people, processes, and project requirements/constraints serves to enhance decisions, strengthen communication pathways, and reinforce the ability of the project team to identify and manage risks across the broad spectrum of project management responsibilities. The ability to identify risks in all areas of project management increases the likelihood a project will identify significant issues before they become problems and allows projects to make effective and efficient use of shrinking resources. By getting a total team integrated risk effort, applying a disciplined and rigorous process, along with understanding project requirements/constraints provides the opportunity for more effective risk management. Applying an integrated approach to risk management makes it possible to do a better job at balancing safety, cost, schedule, operational performance and other elements of risk. This paper will examine how people, processes, and project requirements/constraints can be integrated across the project lifecycle for better risk management and ultimately improve the chances for mission success.

  1. Building an outpatient imaging center: A case study at genesis healthcare system, part 2.

    PubMed

    Yanci, Jim

    2006-01-01

    In the second of 2 parts, this article will focus on process improvement projects utilizing a case study at Genesis HealthCare System located in Zanesville, OH. Operational efficiency is a key step in developing a freestanding diagnostic imaging center. The process improvement projects began with an Expert Improvement Session (EIS) on the scheduling process. An EIS session is a facilitated meeting that can last anywhere from 3 hours to 2 days. Its intention is to take a group of people involved with the problem or operational process and work to understand current failures or breakdowns in the process. Recommendations are jointly developed to overcome any current deficiencies, and a work plan is structured to create ownership over the changes. A total of 11 EIS sessions occurred over the course of this project, covering 5 sections: Scheduling/telephone call process, Pre-registration, Verification/pre-certification, MRI throughput, CT throughput. Following is a single example of a project focused on the process improvement efforts. All of the process improvement projects utilized a quasi methodology of "DMAIC" (Define, Measure, Analyze, Improve, and Control).

  2. Off-farm applications of solar energy in agriculture

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Berry, R.E.

    1980-01-01

    Food processing applications make up almost all present off-farm studies of solar energy in agriculture. Research, development and demonstration projects on solar food processing have shown significant progress over the past 3 years. Projects have included computer simulation and mathematical models, hardware and process development for removing moisture from horticultural or animal products, integration of energy conservation with solar energy augmentation in conventional processes, and commercial scale demonstrations. The demonstration projects include solar heated air for drying prunes and raisins, soy beans and onions/garlic; and solar generated steam for orange juice pasteurization. Several new and planned projects hold considerable promisemore » for commerical exploitation in future food processes.« less

  3. 76 FR 77891 - Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-14

    ... Return Processing Delays Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION... Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and... Project Committee will be held Tuesday, January 03, 2012, at 9:30 a.m. Pacific Time via telephone...

  4. 77 FR 40409 - Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-09

    ... Return Processing Delays Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION... Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and... Project Committee will be held Tuesday, August 7, 2012, at 9:30 a.m. Pacific Time via telephone conference...

  5. 77 FR 55525 - Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-10

    ... Return Processing Delays Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION... Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and... Project Committee will be held Tuesday, October 2, 2012, at 9:30 a.m. Pacific Time via telephone...

  6. 77 FR 37103 - Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-20

    ... Project Committee will be conducted. The Taxpayer Advocacy Panel is soliciting public comments, ideas, and... Project Committee will be held Tuesday, July 03, 2012, at 9:30 a.m. Pacific Time via telephone conference... Return Processing Delays Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION...

  7. Management of major system programs and projects. Handbook

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This Handbook establishes the detailed policies and processes for implementing NMI 7120.4, 'Management of Major System Programs and Projects'. It constitutes a comprehensive source of the specific policies and processes governing management of major development programs/projects and is intended as a resource to the entire program/project management (PPM) community.

  8. Workflow-Based Software Development Environment

    NASA Technical Reports Server (NTRS)

    Izygon, Michel E.

    2013-01-01

    The Software Developer's Assistant (SDA) helps software teams more efficiently and accurately conduct or execute software processes associated with NASA mission-critical software. SDA is a process enactment platform that guides software teams through project-specific standards, processes, and procedures. Software projects are decomposed into all of their required process steps or tasks, and each task is assigned to project personnel. SDA orchestrates the performance of work required to complete all process tasks in the correct sequence. The software then notifies team members when they may begin work on their assigned tasks and provides the tools, instructions, reference materials, and supportive artifacts that allow users to compliantly perform the work. A combination of technology components captures and enacts any software process use to support the software lifecycle. It creates an adaptive workflow environment that can be modified as needed. SDA achieves software process automation through a Business Process Management (BPM) approach to managing the software lifecycle for mission-critical projects. It contains five main parts: TieFlow (workflow engine), Business Rules (rules to alter process flow), Common Repository (storage for project artifacts, versions, history, schedules, etc.), SOA (interface to allow internal, GFE, or COTS tools integration), and the Web Portal Interface (collaborative web environment

  9. Defense Infrastructure: DOD Needs Clearer Guidance on Notifying Congress of Privately Financed Construction Projects

    DTIC Science & Technology

    2017-01-01

    fast food restaurants . Because these projects are not authorized and funded through the regular appropriations process for military construction...750,000 threshold for major projects. 5We selected this sample by identifying one project of each type—commissary; exchange; morale, welfare, and...of 212 possible projects. Further details of our selection process are found in appendix I. Page 3 GAO-17-76 Nonappropriated Fund

  10. Camera calibration based on the back projection process

    NASA Astrophysics Data System (ADS)

    Gu, Feifei; Zhao, Hong; Ma, Yueyang; Bu, Penghui

    2015-12-01

    Camera calibration plays a crucial role in 3D measurement tasks of machine vision. In typical calibration processes, camera parameters are iteratively optimized in the forward imaging process (FIP). However, the results can only guarantee the minimum of 2D projection errors on the image plane, but not the minimum of 3D reconstruction errors. In this paper, we propose a universal method for camera calibration, which uses the back projection process (BPP). In our method, a forward projection model is used to obtain initial intrinsic and extrinsic parameters with a popular planar checkerboard pattern. Then, the extracted image points are projected back into 3D space and compared with the ideal point coordinates. Finally, the estimation of the camera parameters is refined by a non-linear function minimization process. The proposed method can obtain a more accurate calibration result, which is more physically useful. Simulation and practical data are given to demonstrate the accuracy of the proposed method.

  11. Integration of utility and environmental activities in the project development process.

    DOT National Transportation Integrated Search

    2010-01-01

    Two sources of delay during the project development process are utility adjustments and the environmental : review and clearance process. There are several efforts underway at the Texas Department of Transportation : (TxDOT) to optimize these process...

  12. Charting the Course: Life Cycle Management of Mars Mission Digital Information

    NASA Technical Reports Server (NTRS)

    Reiz, Julie M.

    2003-01-01

    This viewgraph presentation reviews the life cycle management of MER Project information. This process was an essential key to the successful launch of the MER Project rovers. Incorporating digital information archive requirements early in the project life cycle resulted in: Design of an information system that included archive metadata, Reduced the risk of information loss through in-process appraisal, Easier transfer of project information to institutional online archive and Project appreciation for preserving information for reuse by future projects

  13. Review of operations in the Virginia Department of Transportation's project development process.

    DOT National Transportation Integrated Search

    2007-01-01

    The Virginia Department of Transportation's (VDOT's) project development process (PDP) directs how construction projects are developed. The purpose of this study was to evaluate the manner in which operations is currently considered throughout the PD...

  14. Using mobile computers to automate the inspection process for highway construction projects.

    DOT National Transportation Integrated Search

    2013-12-01

    Highway construction projects are characterized by the large amount of data that needs to be collected, processed, and exchanged among the : different project participants. Collection of construction inspection data, in particular, allows field perso...

  15. Launch Vehicle Design Process Characterization Enables Design/Project Tool

    NASA Technical Reports Server (NTRS)

    Blair, J. C.; Ryan, R. S.; Schutzenhofer, L. A.; Robinson, Nancy (Technical Monitor)

    2001-01-01

    The objectives of the project described in this viewgraph presentation included the following: (1) Provide an overview characterization of the launch vehicle design process; and (2) Delineate design/project tool to identify, document, and track pertinent data.

  16. Pre-contract project scoping processes : synthesis of practices.

    DOT National Transportation Integrated Search

    2016-02-01

    Scoping is the process of developing a projects objectives, need, preliminary cost estimate, and preliminary schedule based on a : recognized need that the project is intended to address. This study (INDOT/JTRP SPR-3944) was launched by the Indian...

  17. EMPRESS: A European Project to Enhance Process Control Through Improved Temperature Measurement

    NASA Astrophysics Data System (ADS)

    Pearce, J. V.; Edler, F.; Elliott, C. J.; Rosso, L.; Sutton, G.; Andreu, A.; Machin, G.

    2017-08-01

    A new European project called EMPRESS, funded by the EURAMET program `European Metrology Program for Innovation and Research,' is described. The 3 year project, which started in the summer of 2015, is intended to substantially augment the efficiency of high-value manufacturing processes by improving temperature measurement techniques at the point of use. The project consortium has 18 partners and 5 external collaborators, from the metrology sector, high-value manufacturing, sensor manufacturing, and academia. Accurate control of temperature is key to ensuring process efficiency and product consistency and is often not achieved to the level required for modern processes. Enhanced efficiency of processes may take several forms including reduced product rejection/waste; improved energy efficiency; increased intervals between sensor recalibration/maintenance; and increased sensor reliability, i.e., reduced amount of operator intervention. Traceability of temperature measurements to the International Temperature Scale of 1990 (ITS-90) is a critical factor in establishing low measurement uncertainty and reproducible, consistent process control. Introducing such traceability in situ (i.e., within the industrial process) is a theme running through this project.

  18. Digital imaging technology assessment: Digital document storage project

    NASA Technical Reports Server (NTRS)

    1989-01-01

    An ongoing technical assessment and requirements definition project is examining the potential role of digital imaging technology at NASA's STI facility. The focus is on the basic components of imaging technology in today's marketplace as well as the components anticipated in the near future. Presented is a requirement specification for a prototype project, an initial examination of current image processing at the STI facility, and an initial summary of image processing projects at other sites. Operational imaging systems incorporate scanners, optical storage, high resolution monitors, processing nodes, magnetic storage, jukeboxes, specialized boards, optical character recognition gear, pixel addressable printers, communications, and complex software processes.

  19. Systemic safety project selection tool.

    DOT National Transportation Integrated Search

    2013-07-01

    "The Systemic Safety Project Selection Tool presents a process for incorporating systemic safety planning into traditional safety management processes. The Systemic Tool provides a step-by-step process for conducting systemic safety analysis; conside...

  20. Reengineering the project design process

    NASA Astrophysics Data System (ADS)

    Kane Casani, E.; Metzger, Robert M.

    1995-01-01

    In response to the National Aeronautics and Space Administration's goal of working faster, better, and cheaper, the Jet Propulsion Laboratory (JPL) has developed extensive plans to minimize cost, maximize customer and employee satisfaction, and implement small- and moderate-size missions. These plans include improved management structures and processes, enhanced technical design processes, the incorporation of new technology, and the development of more economical space- and ground-system designs. The Laboratory's new Flight Projects Implementation Development Office has been chartered to oversee these innovations and the reengineering of JPL's project design process, including establishment of the Project Design Center (PDC) and the Flight System Testbed (FST). Reengineering at JPL implies a cultural change whereby the character of the Laboratory's design process will change from sequential to concurrent and from hierarchical to parallel. The Project Design Center will support missions offering high science return, design to cost, demonstrations of new technology, and rapid development. Its computer-supported environment will foster high-fidelity project life-cycle development and more accurate cost estimating. These improvements signal JPL's commitment to meeting the challenges of space exploration in the next century.

  1. 12om Methodology: Process v1.1

    DTIC Science & Technology

    2014-03-31

    in support of the Applied Research Project (ARP) 12om entitled “Collaborative Understanding of Complex Situations”. The overall purpose of this...Definition ARP Applied Research Project CF Canadian Forces CFOPP Canadian Forces Operational Planning Process CIDA Canadian International... Research Project (ARP) 12om entitled “Collaborative Understanding of Complex Situations”. The overall purpose of this project is to develop a

  2. Relational approach in managing construction project safety: a social capital perspective.

    PubMed

    Koh, Tas Yong; Rowlinson, Steve

    2012-09-01

    Existing initiatives in the management of construction project safety are largely based on normative compliance and error prevention, a risk management approach. Although advantageous, these approaches are not wholly successful in further lowering accident rates. A major limitation lies with the approaches' lack of emphasis on the social and team processes inherent in construction project settings. We advance the enquiry by invoking the concept of social capital and project organisational processes, and their impacts on project safety performance. Because social capital is a primordial concept and affects project participants' interactions, its impact on project safety performance is hypothesised to be indirect, i.e. the impact of social capital on safety performance is mediated by organisational processes in adaptation and cooperation. A questionnaire survey was conducted within Hong Kong construction industry to test the hypotheses. 376 usable responses were received and used for analyses. The results reveal that, while the structural dimension is not significant, the mediational thesis is generally supported with the cognitive and relational dimensions affecting project participants' adaptation and cooperation, and the latter two processes affect safety performance. However, the cognitive dimension also directly affects safety performance. The implications of these results for project safety management are discussed. Copyright © 2011 Elsevier Ltd. All rights reserved.

  3. Implementing EVM Data Analysis Adding Value from a NASA Project Manager's Perspective

    NASA Technical Reports Server (NTRS)

    Counts, Stacy; Kerby, Jerald

    2006-01-01

    Data Analysis is one of the keys to an effective Earned Value Management (EVM) Process. Project Managers (PM) must continually evaluate data in assessing the health of their projects. Good analysis of data can assist PMs in making better decisions in managing projects. To better support our P Ms, National Aeronautics and Space Administration (NASA) - Marshall Space Flight Center (MSFC) recently renewed its emphasis on sound EVM data analysis practices and processes, During this presentation we will discuss the approach that MSFC followed in implementing better data analysis across its Center. We will address our approach to effectively equip and support our projects in applying a sound data analysis process. In addition, the PM for the Space Station Biological Research Project will share her experiences of how effective data analysis can benefit a PM in the decision making process. The PM will discuss how the emphasis on data analysis has helped create a solid method for assessing the project s performance. Using data analysis successfully can be an effective and efficient tool in today s environment with increasing workloads and downsizing workforces

  4. Ambiguous meanings of projects as facilitators of sensegiving.

    PubMed

    Lunkka, Nina; Suhonen, Marjo

    2015-10-01

    To describe mid-level nurse managers' experiences of sensegiving in the context of hospital projects. Sensegiving is about shaping and affecting how employees see themselves, their work and issues related to their work. It has been little studied in the context of hospital projects from mid-level nurse managers' point of view. Mid-level nurse managers (n = 10) were interviewed about their experiences of projects from the viewpoint of sensegiving during change processes. Data was analysed using discourse analysis. Three repertoires were constructed from the data: the repertoires of regeneration, control and humane. Projects were considered as appropriate ways for sensegiving in hospitals from the viewpoint of mid-level nurse managers. In order to use projects effectively in hospitals as means for change management mid-level nurse managers ought to enhance their role as interpreters during the change process (i.e. strengthen their visioning, talk and dialogue skills). Training on the nature of change as a social and interactive process could deepen mid-level nurse managers' understanding of the change process in the context of hospital projects. © 2014 John Wiley & Sons Ltd.

  5. NASA Expendable Launch Vehicle (ELV) Payload Safety Review Process

    NASA Technical Reports Server (NTRS)

    Starbus, Calvert S.; Donovan, Shawn; Dook, Mike; Palo, Tom

    2007-01-01

    Issues addressed by this program: (1) Complicated roles and responsibilities associated with multi-partner projects (2) Working relationships and communications between all organizations involved in the payload safety process (3) Consistent interpretation and implementation of safety requirements from one project to the rest (4) Consistent implementation of the Tailoring Process (5) Clearly defined NASA decision-making-authority (6) Bring Agency-wide perspective to each ElV payload project. Current process requires a Payload Safety Working Group (PSWG) for eac payload with representatives from all involved organizations.

  6. Assessing participatory practices in community-based natural resource management: experiences in community engagement from southern Africa.

    PubMed

    Dyer, J; Stringer, L C; Dougill, A J; Leventon, J; Nshimbi, M; Chama, F; Kafwifwi, A; Muledi, J I; Kaumbu, J-M K; Falcao, M; Muhorro, S; Munyemba, F; Kalaba, G M; Syampungani, S

    2014-05-01

    The emphasis on participatory environmental management within international development has started to overcome critiques of traditional exclusionary environmental policy, aligning with shifts towards decentralisation and community empowerment. However, questions are raised regarding the extent to which participation in project design and implementation is meaningful and really engages communities in the process. Calls have been made for further local-level (project and community-scale) research to identify practices that can increase the likelihood of meaningful community engagement within externally initiated projects. This paper presents data from three community-based natural resource management (CBNRM) project case studies from southern Africa, which promote Joint Forest Management (JFM), tree planting for carbon and conservation agriculture. Data collection was carried out through semi-structured interviews with key stakeholders, community-level meetings, focus groups and interviews. We find that an important first step for a meaningful community engagement process is to define 'community' in an open and participatory manner. Two-way communication at all stages of the community engagement process is shown to be critical, and charismatic leadership based on mutual respect and clarity of roles and responsibilities is vital to improve the likelihood of participants developing understanding of project aims and philosophy. This can lead to successful project outcomes through community ownership of the project goals and empowerment in project implementation. Specific engagement methods are found to be less important than the contextual and environmental factors associated with each project, but consideration should be given to identifying appropriate methods to ensure community representation. Our findings extend current thinking on the evaluation of participation by making explicit links between the community engagement process and project outcomes, and by identifying further criteria that can be considered in process and outcome-based evaluations. We highlight good practices for future CBNRM projects which can be used by project designers and initiators to further the likelihood of successful project outcomes. Copyright © 2014. Published by Elsevier Ltd.

  7. Quality Assurance Project Plan for Citizen Science Projects

    EPA Pesticide Factsheets

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  8. Baseline process description for simulating plutonium oxide production for precalc project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pike, J. A.

    Savannah River National Laboratory (SRNL) started a multi-year project, the PreCalc Project, to develop a computational simulation of a plutonium oxide (PuO 2) production facility with the objective to study the fundamental relationships between morphological and physicochemical properties. This report provides a detailed baseline process description to be used by SRNL personnel and collaborators to facilitate the initial design and construction of the simulation. The PreCalc Project team selected the HB-Line Plutonium Finishing Facility as the basis for a nominal baseline process since the facility is operational and significant model validation data can be obtained. The process boundary as wellmore » as process and facility design details necessary for multi-scale, multi-physics models are provided.« less

  9. Tailoring Systems Engineering Projects for Small Satellite Missions

    NASA Technical Reports Server (NTRS)

    Horan, Stephen; Belvin, Keith

    2013-01-01

    NASA maintains excellence in its spaceflight systems by utilizing rigorous engineering processes based on over 50 years of experience. The NASA systems engineering process for flight projects described in NPR 7120.5E was initially developed for major flight projects. The design and development of low-cost small satellite systems does not entail the financial and risk consequences traditionally associated with spaceflight projects. Consequently, an approach is offered to tailoring of the processes such that the small satellite missions will benefit from the engineering rigor without overly burdensome overhead. In this paper we will outline the approaches to tailoring the standard processes for these small missions and describe how it will be applied in a proposed small satellite mission.

  10. Evaluation of the Cape Seal Process as a Pavement Rehabilitation Alternative

    DOT National Transportation Integrated Search

    1998-10-01

    A 1-year research project was conducted to evaluate the Cape seal process as a pavement rehabilitation technique. During the course of this research project, most of the Cape seal projects that have been constructed within the state were visited as p...

  11. Exploitation and Benefits of BIM in Construction Project Management

    NASA Astrophysics Data System (ADS)

    Mesároš, Peter; Mandičák, Tomáš

    2017-10-01

    BIM is increasingly getting into the awareness in construction industry. BIM is the process of creating and data managing of the building during its life cycle. BIM became a part of management tools in modern construction companies. Construction projects have a number of participants. It means difficulty process of construction project management and a serious requirement for processing the huge amount of information including design, construction, time and cost parameters, economic efficiency and sustainability. Progressive information and communication technologies support cost management and management of construction project. One of them is Building Information Modelling. Aim of the paper is to examine the impact of BIM exploitation and benefits on construction project management in Slovak companies.

  12. Method for modeling social care processes for national information exchange.

    PubMed

    Miettinen, Aki; Mykkänen, Juha; Laaksonen, Maarit

    2012-01-01

    Finnish social services include 21 service commissions of social welfare including Adoption counselling, Income support, Child welfare, Services for immigrants and Substance abuse care. This paper describes the method used for process modeling in the National project for IT in Social Services in Finland (Tikesos). The process modeling in the project aimed to support common national target state processes from the perspective of national electronic archive, increased interoperability between systems and electronic client documents. The process steps and other aspects of the method are presented. The method was developed, used and refined during the three years of process modeling in the national project.

  13. Designing a process for executing projects under an international agreement

    NASA Technical Reports Server (NTRS)

    Mohan, S. N.

    2003-01-01

    Projects executed under an international agreement require special arrangements in order to operate within confines of regulations issued by the State Department and the Commerce Department. In order to communicate enterprise-level guidance and procedural information uniformly to projects based on interpretations that carry the weight of institutional authority, a process was developed. This paper provides a script for designing processes in general, using this particular process for context. While the context is incidental, the method described is applicable to any process in general. The paper will expound on novel features utilized for dissemination of the procedural details over the Internet following such process design.

  14. Enhanced Capabilities for Subcritical Experiments (ECSE) Risk Management Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Urban, Mary Elizabeth

    Risk is a factor, element, constraint, or course of action that introduces an uncertainty of outcome that could impact project objectives. Risk is an inherent part of all activities, whether the activity is simple and small, or large and complex. Risk management is a process that identifies, evaluates, handles, and monitors risks that have the potential to affect project success. The risk management process spans the entire project, from its initiation to its successful completion and closeout, including both technical and programmatic (non-technical) risks. This Risk Management Plan (RMP) defines the process to be used for identifying, evaluating, handling, andmore » monitoring risks as part of the overall management of the Enhanced Capabilities for Subcritical Experiments (ECSE) ‘Project’. Given the changing nature of the project environment, risk management is essentially an ongoing and iterative process, which applies the best efforts of a knowledgeable project staff to a suite of focused and prioritized concerns. The risk management process itself must be continually applied throughout the project life cycle. This document was prepared in accordance with DOE O 413.3B, Program and Project Management for the Acquisition of Capital Assets, its associated guide for risk management DOE G 413.3-7, Risk Management Guide, and LANL ADPM AP-350-204, Risk and Opportunity Management.« less

  15. The PMDP Roadmap

    NASA Technical Reports Server (NTRS)

    2004-01-01

    NASA's complex and highly technical missions rely on effective project teams and managers. Since 1993, through its Project Management Development Process (PMDP), the Academy of Program and Project Leadership (APPL) has offered direction to the Agency's project practitioners as they advance in their careers. PMDP helps identify and sequence professional experiences, courses, and other project-based learning experiences that support individual career goals and center activities by outlining competencies at four levels of development. The result is that PMDP provides NASA project practitioners with a road map to the knowledge and competencies appropriate for their job and the jobs to which they aspire. Plus, new this year, APPL has rolled out its electronic Project Management Development Process (ePMDP) tool, a learning management system that includes a dynamic presentation of the PMDP levels, competency areas, competency organizational structures, Individual Development Plans (IDP), and online PMDP enrollment. APPL's website, www.appl.nasa.gov, provides access to ePMDP as well as other online resources for NASA practitioners enrolled in the Project Management Development Process.

  16. Advanced coal conversion process demonstration. Technical progress report for the period July 1, 1995--September 30, 1995

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1997-05-01

    This report describes the technical progress made on the Advanced Coal Conversion Process (ACCP) Demonstration Project from July 1, 1995 through September 30, 1995. The ACCP Demonstration Project is a US Department of Energy (DOE) Clean Coal Technology Project. This project demonstrates an advanced, thermal, coal upgrading process, coupled with physical cleaning techniques, that is designed to upgrade high-moisture, low-rank coals to a high-quality, low-sulfur fuel, registered as the SynCoal process. The coal is processed through three stages (two heating stages followed by an inert cooling stage) of vibrating fluidized bed reactors that remove chemically bound water, carboxyl groups, andmore » volatile sulfur compounds. After thermal upgrading, the cola is put through a deep-bed stratifier cleaning process to separate the pyrite-rich ash from the coal.« less

  17. Strategy for 90% autoverification of clinical chemistry and immunoassay test results using six sigma process improvement.

    PubMed

    Randell, Edward W; Short, Garry; Lee, Natasha; Beresford, Allison; Spencer, Margaret; Kennell, Marina; Moores, Zoë; Parry, David

    2018-06-01

    Six Sigma involves a structured process improvement strategy that places processes on a pathway to continued improvement. The data presented here summarizes a project that took three clinical laboratories from autoverification processes that allowed between about 40% to 60% of tests being auto-verified to more than 90% of tests and samples auto-verified. The project schedule, metrics and targets, a description of the previous system and detailed information on the changes made to achieve greater than 90% auto-verification is presented for this Six Sigma DMAIC (Design, Measure, Analyze, Improve, Control) process improvement project.

  18. Analysis and Evaluation of Processes and Equipment in Tasks 2 and 4 of the Low-cost Solar Array Project

    NASA Technical Reports Server (NTRS)

    Goldman, H.; Wolf, M.

    1978-01-01

    The significant economic data for the current production multiblade wafering and inner diameter slicing processes were tabulated and compared to data on the experimental and projected multiblade slurry, STC ID diamond coated blade, multiwire slurry and crystal systems fixed abrasive multiwire slicing methods. Cost calculations were performed for current production processes and for 1982 and 1986 projected wafering techniques.

  19. Project management plan, Waste Receiving and Processing Facility, Module 1, Project W-026

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Starkey, J.G.

    1993-05-01

    The Hanford Waste Receiving and Processing Facility Module 1 Project (WRAP 1) has been established to support the retrieval and final disposal of approximately 400K grams of plutonium and quantities of hazardous components currently stored in drums at the Hanford Site.

  20. Descending projections from the dysgranular zone of rat primary somatosensory cortex processing deep somatic input.

    PubMed

    Lee, Taehee; Kim, Uhnoh

    2012-04-01

    In the mammalian somatic system, peripheral inputs from cutaneous and deep receptors ascend via different subcortical channels and terminate in largely separate regions of the primary somatosensory cortex (SI). How these inputs are processed in SI and then projected back to the subcortical relay centers is critical for understanding how SI may regulate somatic information processing in the subcortex. Although it is now relatively well understood how SI cutaneous areas project to the subcortical structures, little is known about the descending projections from SI areas processing deep somatic input. We examined this issue by using the rodent somatic system as a model. In rat SI, deep somatic input is processed mainly in the dysgranular zone (DSZ) enclosed by the cutaneous barrel subfields. By using biotinylated dextran amine (BDA) as anterograde tracer, we characterized the topography of corticostriatal and corticofugal projections arising in the DSZ. The DSZ projections terminate mainly in the lateral subregions of the striatum that are also known as the target of certain SI cutaneous areas. This suggests that SI processing of deep and cutaneous information may be integrated, to a certain degree, in this striatal region. By contrast, at both thalamic and prethalamic levels as far as the spinal cord, descending projections from DSZ terminate in areas largely distinguishable from those that receive input from SI cutaneous areas. These subcortical targets of DSZ include not only the sensory but also motor-related structures, suggesting that SI processing of deep input may engage in regulating somatic and motor information flow between the cortex and periphery. Copyright © 2011 Wiley-Liss, Inc.

  1. Improving flow in the OR.

    PubMed

    Blouin-Delisle, Charles Hubert; Drolet, Renee; Gagnon, Serge; Turcotte, Stephane; Boutet, Sylvie; Coulombe, Martin; Daneau, Eric

    2018-03-12

    Purpose The purpose of this paper is to increase efficiency in ORs without affecting quality of care by improving the workflow processes. Administrative processes independent of the surgical act can be challenging and may lead to clinical impacts such as increasing delays. The authors hypothesized that a Lean project could improve efficiency of surgical processes by reducing the length of stays in the recovery ward. Design/methodology/approach Two similar Lean projects were performed in the surgery departments of two hospitals of the Centre Hospitalier Universitaire de Québec: Hôtel Dieu de Quebec (HDQ) and Hôpital de l'Enfant Jesus (HEJ). The HDQ project designed around a Define, Measure, Analyse, Improve and Control process revision and a Kaizen workshop focused on patients who were hospitalized in a specific care unit after surgery and the HEJ project targeted patients in a post-operative ambulatory context. The recovery ward output delay was measured retrospectively before and after project. Findings For the HDQ Lean project, wasted time in the recovery ward was reduced by 62 minutes (68 percent reduction) between the two groups. The authors also observed an increase of about 25 percent of all admissions made in the daytime after the project compared to the time period before the project. For the HEJ Lean project, time passed in the recovery ward was reduced by 6 min (29 percent reduction). Originality/value These projects produced an improvement in the flow of the OR without targeting clinical practices in the OR itself. They demonstrated that change in administrative processes can have a great impact on the flow of clinical pathways and highlight the need for comprehensive and precise monitoring of every step of the elective surgery patient trajectory.

  2. ENGINEERING STUDY FOR THE 200 AREA EFFLUENT TREATMENT FACILITY (ETF) SECONDARY WASTE TREATMENT OF PROJECTED FUTURE WASTE FEEDS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    LUECK, K.J.

    2004-10-18

    This report documents an engineering study conducted to evaluate alternatives for treating secondary waste in the secondary treatment train (STT) of the Hanford Site 200 Area Effluent Treatment Facility (ETF). The study evaluates ETF STT treatment alternatives and recommends preferred alternatives for meeting the projected future missions of the ETF. The preferred alternative(s) will process projected future ETF influents to produce a solid waste acceptable for final disposal on the Hanford Site. The main text of this report summarizes the ETF past and projected operations, lists the assumptions about projected operations that provide the basis for the engineering evaluation, andmore » summarizes the evaluation process. The evaluation process includes identification of available modifications to the current ETF process, screens those modifications for technical viability, evaluates the technically viable alternatives, and provides conclusions and recommendations based on that evaluation.« less

  3. The evolution of a doctor of nursing practice capstone process: programmatic revisions to improve the quality of student projects.

    PubMed

    Nelson, Joan M; Cook, Paul F; Raterink, Ginger

    2013-01-01

    The past several years have seen explosive growth in the number of doctor of nursing practice (DNP) degree programs offered by colleges of nursing in the United States. Through a process of trial and error since 2005, the faculty at the University of Colorado, College of Nursing, have revised the course structure and procedures related to the DNP capstone project to improve the quality and usefulness of these student projects. Efforts have focused on educating and involving all nursing faculty in the DNP capstone process, distinguishing between competencies for our PhD and DNP projects, clearly aligning the DNP capstone project with quality improvement methods rather than with research, working with our campus institutional review board to clarify regulatory review requirements for quality improvement studies, developing a review committee to oversee DNP students' projects, and structuring our sequential course requirements to encourage students' professional presentations and publications. Our current capstone process reflects 7 years of iterative work, which we summarize in this article in hopes that it will help institutions currently in the process of developing a DNP program. Copyright © 2013 Elsevier Inc. All rights reserved.

  4. The maturing of the quality improvement paradigm in the SEL

    NASA Technical Reports Server (NTRS)

    Basili, Victor R.

    1993-01-01

    The Software Engineering Laboratory uses a paradigm for improving the software process and product, called the quality improvement paradigm. This paradigm has evolved over the past 18 years, along with our software development processes and product. Since 1976, when we first began the SEL, we have learned a great deal about improving the software process and product, making a great many mistakes along the way. Quality improvement paradigm, as it is currently defined, can be broken up into six steps: characterize the current project and its environment with respect to the appropriate models and metrics; set the quantifiable goals for successful project performance and improvement; choose the appropriate process model and supporting methods and tools for this project; execute the processes, construct the products, and collect, validate, and analyze the data to provide real-time feedback for corrective action; analyze the data to evaluate the current practices, determine problems, record findings, and make recommendations for future project improvements; and package the experience gained in the form of updated and refined models and other forms of structured knowledge gained from this and prior projects and save it in an experience base to be reused on future projects.

  5. How to conduct a clinical audit and quality improvement project.

    PubMed

    Limb, Christopher; Fowler, Alex; Gundogan, Buket; Koshy, Kiron; Agha, Riaz

    2017-07-01

    Audits and quality improvement projects are vital aspects of clinical governance and continual service improvement in medicine. In this article we describe the process of clinical audit and quality improvement project. Guidance is also provided on how to design an effective audit and bypass barriers encountered during the process.

  6. Projective Techniques in the Counseling Process.

    ERIC Educational Resources Information Center

    Clark, Arthur J.

    1995-01-01

    Projective techniques have evoked a minimal degree of interest on the part of counselors due to psychometric limitations, lack of training opportunities, and the obscure qualities of the instruments. The author proposes a method to stimulate the use of projectives as an integral part of the counseling process and provides justification for the…

  7. Understanding the Sales Process by Selling

    ERIC Educational Resources Information Center

    Bussière, Dave

    2017-01-01

    Experiential projects bring students closer to real-world situations. This is valuable in sales education because the complexities of the sales process are difficult to learn from a textbook. A student project was developed that involved the selling of advertising space in a one-time newspaper insert. The project included a substantial minimum…

  8. A Tool for Creating Healthier Workplaces: The Conducivity Process

    ERIC Educational Resources Information Center

    Karasek, Robert A.

    2004-01-01

    The conducivity process, a methodology for creating healthier workplaces by promoting conducive production, is illustrated through the use of the "conducivity game" developed in the NordNet Project in Sweden, which was an action research project to test a job redesign methodology. The project combined the "conducivity" hypotheses about a…

  9. A Framework for Categorizing Important Project Variables

    NASA Technical Reports Server (NTRS)

    Parsons, Vickie S.

    2003-01-01

    While substantial research has led to theories concerning the variables that affect project success, no universal set of such variables has been acknowledged as the standard. The identification of a specific set of controllable variables is needed to minimize project failure. Much has been hypothesized about the need to match project controls and management processes to individual projects in order to increase the chance for success. However, an accepted taxonomy for facilitating this matching process does not exist. This paper surveyed existing literature on classification of project variables. After an analysis of those proposals, a simplified categorization is offered to encourage further research.

  10. The Processing of Extraposed Structures in English

    PubMed Central

    Levy, Roger; Fedorenko, Evelina; Breen, Mara; Gibson, Ted

    2012-01-01

    In most languages, most of the syntactic dependency relations found in any given sentence are PROJECTIVE: the word-word dependencies in the sentence do not cross each other. Some syntactic dependency relations, however, are NON-PROJECTIVE: some of their word-word dependencies cross each other. Non-projective dependencies are both rarer and more computationally complex than projective dependencies; hence, it is of natural interest to investigate whether there are any processing costs specific to non-projective dependencies, and whether factors known to influence processing of projective dependencies also affect non-projective dependency processing. We report three self-paced reading studies, together with corpus and sentence completion studies, investigating the comprehension difficulty associated with the non-projective dependencies created by the extraposition of relative clauses in English. We find that extraposition over either verbs or prepositional phrases creates comprehension difficulty, and that this difficulty is consistent with probabilistic syntactic expectations estimated from corpora. Furthermore, we find that manipulating the expectation that a given noun will have a postmodifying relative clause can modulate and even neutralize the difficulty associated with extraposition. Our experiments rule out accounts based purely on derivational complexity and/or dependency locality in terms of linear positioning. Our results demonstrate that comprehenders maintain probabilistic syntactic expectations that persist beyond projective-dependency structures, and suggest that it may be possible to explain observed patterns of comprehension difficulty associated with extraposition entirely through probabilistic expectations. PMID:22035959

  11. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    NASA Astrophysics Data System (ADS)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of measures of the goals. It is crucial to identify the stakeholders, whereas it is a continuous and quite difficult process. However, when ignoring the impact of specific stakeholders on the implementation of the project, a duration of the project and its costs may increase. A main problem, in establishing a relationship of participants in the construction process, is to take into account the risk of all project stakeholders.

  12. Automated Array Assembly, Phase 2. Low-cost Solar Array Project, Task 4

    NASA Technical Reports Server (NTRS)

    Lopez, M.

    1978-01-01

    Work was done to verify the technological readiness of a select process sequence with respect to satisfying the Low Cost Solar Array Project objectives of meeting the designated goals of $.50 per peak watt in 1986 (1975 dollars). The sequence examined consisted of: (1) 3 inches diameter as-sawn Czochralski grown 1:0:0 silicon, (2) texture etching, (3) ion implanting, (4) laser annealing, (5) screen printing of ohmic contacts and (6) sprayed anti-reflective coatings. High volume production projections were made on the selected process sequence. Automated processing and movement of hardware at high rates were conceptualized to satisfy the PROJECT's 500 MW/yr capability. A production plan was formulated with flow diagrams integrating the various processes in the cell fabrication sequence.

  13. Risk-based Prioritization of Facility Decommissioning and Environmental Restoration Projects in the National Nuclear Legacy Liabilities Program at the Chalk River Laboratory - 13564

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nelson, Jerel G.; Kruzic, Michael; Castillo, Carlos

    2013-07-01

    Chalk River Laboratory (CRL), located in Ontario Canada, has a large number of remediation projects currently in the Nuclear Legacy Liabilities Program (NLLP), including hundreds of facility decommissioning projects and over one hundred environmental remediation projects, all to be executed over the next 70 years. Atomic Energy of Canada Limited (AECL) utilized WorleyParsons to prioritize the NLLP projects at the CRL through a risk-based prioritization and ranking process, using the WorleyParsons Sequencing Unit Prioritization and Estimating Risk Model (SUPERmodel). The prioritization project made use of the SUPERmodel which has been previously used for other large-scale site prioritization and sequencing ofmore » facilities at nuclear laboratories in the United States. The process included development and vetting of risk parameter matrices as well as confirmation/validation of project risks. Detailed sensitivity studies were also conducted to understand the impacts that risk parameter weighting and scoring had on prioritization. The repeatable prioritization process yielded an objective, risk-based and technically defendable process for prioritization that gained concurrence from all stakeholders, including Natural Resources Canada (NRCan) who is responsible for the oversight of the NLLP. (authors)« less

  14. Hardware Implementation of Multiple Fan Beam Projection Technique in Optical Fibre Process Tomography

    PubMed Central

    Rahim, Ruzairi Abdul; Fazalul Rahiman, Mohd Hafiz; Leong, Lai Chen; Chan, Kok San; Pang, Jon Fea

    2008-01-01

    The main objective of this project is to implement the multiple fan beam projection technique using optical fibre sensors with the aim to achieve a high data acquisition rate. Multiple fan beam projection technique here is defined as allowing more than one emitter to transmit light at the same time using the switch-mode fan beam method. For the thirty-two pairs of sensors used, the 2-projection technique and 4-projection technique are being investigated. Sixteen sets of projections will complete one frame of light emission for the 2-projection technique while eight sets of projection will complete one frame of light emission for the 4-projection technique. In order to facilitate data acquisition process, PIC microcontroller and the sample and hold circuit are being used. This paper summarizes the hardware configuration and design for this project. PMID:27879885

  15. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    PubMed

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  16. Delivering Software Process-Specific Project Courses in Tertiary Education Environment: Challenges and Solution

    ERIC Educational Resources Information Center

    Rong, Guoping; Shao, Dong

    2012-01-01

    The importance of delivering software process courses to software engineering students has been more and more recognized in China in recent years. However, students usually cannot fully appreciate the value of software process courses by only learning methodology and principle in the classroom. Therefore, a process-specific project course was…

  17. Prototype Software Assurance Framework (SAF): Introduction and Overview

    DTIC Science & Technology

    2017-04-05

    Introduction 1 1 Process Management (Category 1) 6 1.1 Process Definition (Area 1.1) 6 1.2 Infrastructure Standards (Area 1.2) 6 1.3 Resources (Area 1.3) 7...1.4 Training (Area 1.4) 8 2 Project Management (Category 2) 9 2.1 Project Plans (Area 2.1) 9 2.2 Project Infrastructure (Area 2.2) 10 2.3 Project...Monitoring (Area 2.3) 10 2.4 Project Risk Management (Area 2.4) 11 2.5 Supplier Management (Area 2.5) 11 3 Engineering (Category 3) 13 3.1 Product

  18. Northwestern Pennsylvania Cooperative Demonstration Project (High Technology). Process Manual.

    ERIC Educational Resources Information Center

    Indiana Univ. of Pennsylvania. Center for Vocational Personnel Preparation.

    This process manual explains the procedures followed by a project that provided training for employees of manufacturing industries. It also focuses on the project's attainment of two other objectives: (1) helping industry in the target area become more competitive with foreign rivals; and (2) building a network between industry and education. A…

  19. ARSENIC REMOVAL FROM DRINKING WATER BY PROCESS MODIFICATION TO COAGULATION/FILTRATION. USEPA DEMONSTRATION PROJECT AT LIDGERWOOD, ND. FINAL PERFORMANCE EVALUATION REPORT

    EPA Science Inventory

    This report documents the activities performed and the results obtained for the arsenic removal treatment technology demonstration project at the Lidgerwood, North Dakota site. The objectives of the project were to evaluate: (1) the effectiveness of process modifications to an e...

  20. Latin American Universities and the Bologna Process: From Commercialisation to the "Tuning" Competencies Project

    ERIC Educational Resources Information Center

    Aboites, Hugo

    2010-01-01

    Through the "Tuning-Latin America" competencies project, Latin American universities have been incorporated into the Bologna Process. In 2003 the European Commission approved an initiative of this project for Latin America and began to promote it among ministries, university presidents' organisations and other institutions in Latin…

  1. A Process Chart to Design Experiential Learning Projects

    ERIC Educational Resources Information Center

    Zhu, Suning; Wu, Yun; Sankar, Chetan S.

    2016-01-01

    A high-impact practice is to incorporate experiential learning projects when teaching difficulty subject matters so as to enhance students' understanding and interest in the course content. But, there is limited research on how to design and execute such projects. Therefore, we propose a framework based on the processes described by the Project…

  2. 76 FR 1612 - Natural Currents Energy Services, LLC; Notice of Intent To File License Application, Filing of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... Energy Services, LLC; Notice of Intent To File License Application, Filing of Draft Application, Request for Waivers of Integrated Licensing Process Regulations Necessary for Expedited Processing of a... Energy Services, LLC. e. Name of Project: Will's Hole Tidal Electric Project. f. Location: The project...

  3. The Local Brewery: A Project for Use in Differential Equations Courses

    ERIC Educational Resources Information Center

    Starling, James K.; Povich, Timothy J.; Findlay, Michael

    2016-01-01

    We describe a modeling project designed for an ordinary differential equations (ODEs) course using first-order and systems of first-order differential equations to model the fermentation process in beer. The project aims to expose the students to the modeling process by creating and solving a mathematical model and effectively communicating their…

  4. From the past to the future: Integrating work experience into the design process.

    PubMed

    Bittencourt, João Marcos; Duarte, Francisco; Béguin, Pascal

    2017-01-01

    Integrating work activity issues into design process is a broadly discussed theme in ergonomics. Participation is presented as the main means for such integration. However, a late participation can limit the development of both project solutions and future work activity. This article presents the concept of construction of experience aiming at the articulated development of future activities and project solutions. It is a non-teleological approach where the initial concepts will be transformed by the experience built up throughout the design process. The method applied was a case study of an ergonomic participation during the design of a new laboratory complex for biotechnology research. Data was obtained through analysis of records in a simulation process using a Lego scale model and interviews with project participants. The simulation process allowed for developing new ways of working and generating changes in the initial design solutions, which enable workers to adopt their own developed strategies for conducting work more safely and efficiently in the future work system. Each project decision either opens or closes a window of opportunities for developing a future activity. Construction of experience in a non-teleological design process allows for understanding the consequences of project solutions for future work.

  5. Analysis of angular momentum properties of photons emitted in fundamental atomic processes

    NASA Astrophysics Data System (ADS)

    Zaytsev, V. A.; Surzhykov, A. S.; Shabaev, V. M.; Stöhlker, Th.

    2018-04-01

    Many atomic processes result in the emission of photons. Analysis of the properties of emitted photons, such as energy and angular distribution as well as polarization, is regarded as a powerful tool for gaining more insight into the physics of corresponding processes. Another characteristic of light is the projection of its angular momentum upon propagation direction. This property has attracted a special attention over the past decades due to studies of twisted (or vortex) light beams. Measurements being sensitive to this projection may provide valuable information about the role of angular momentum in the fundamental atomic processes. Here we describe a simple theoretical method for determination of the angular momentum properties of the photons emitted in various atomic processes. This method is based on the evaluation of expectation value of the total angular momentum projection operator. To illustrate the method, we apply it to the textbook examples of plane-wave, spherical-wave, and Bessel light. Moreover, we investigate the projection of angular momentum for the photons emitted in the process of the radiative recombination with ionic targets. It is found that the recombination photons do carry a nonzero projection of the orbital angular momentum.

  6. A Quantitative Examination of Critical Success Factors Comparing Agile and Waterfall Project Management Methodologies

    ERIC Educational Resources Information Center

    Pedersen, Mitra

    2013-01-01

    This study investigated the rate of success for IT projects using agile and standard project management methodologies. Any successful project requires use of project methodology. Specifically, large projects require formal project management methodologies or models, which establish a blueprint of processes and project planning activities. This…

  7. A Project Management Approach to an ACPE Accreditation Self-study

    PubMed Central

    Iwanowicz, Susan L.; Bailie, George R.; Clarke, David W.; McGraw, Patrick S.

    2007-01-01

    In preparation for an on-site evaluation and accreditation by the American Council on Pharmaceutical Education (ACPE), the Albany College of Pharmacy employed project management techniques to complete a comprehensive self-study. A project lifecycle approach, including planning, production, and turnover phases, was used by the project's Self-Study Steering Committee. This approach, with minimal disruption to college operations, resulted in the completion of the self-study process on schedule. Throughout the project, the Steering Committee maintained a log of functions that either were executed successfully or in hindsight, could have been improved. To assess the effectiveness of the project management approach to the the self-study process, feedback was obtained from the College community through a poststudy survey. This feedback, coupled with the Steering Committee's data on possible improvements, form the basis for the lessons learned during this self-study process. PMID:17533432

  8. A project management approach to an ACPE accreditation self-study.

    PubMed

    Dominelli, Angela; Iwanowicz, Susan L; Bailie, George R; Clarke, David W; McGraw, Patrick S

    2007-04-15

    In preparation for an on-site evaluation and accreditation by the American Council on Pharmaceutical Education (ACPE), the Albany College of Pharmacy employed project management techniques to complete a comprehensive self-study. A project lifecycle approach, including planning, production, and turnover phases, was used by the project's Self-Study Steering Committee. This approach, with minimal disruption to college operations, resulted in the completion of the self-study process on schedule. Throughout the project, the Steering Committee maintained a log of functions that either were executed successfully or in hindsight, could have been improved. To assess the effectiveness of the project management approach to the the self-study process, feedback was obtained from the College community through a poststudy survey. This feedback, coupled with the Steering Committee's data on possible improvements, form the basis for the lessons learned during this self-study process.

  9. Process Parameter Evaluation and Optimization for Advanced Material Development Final Report CRADA No. TC-1234-96

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hrubesh, L.; McGann, T. W.

    This project was established as a three-year collaboration to produce and characterize · silica aerogels prepared by a Rapid Supercritical Extraction (RSCE) process to meet . BNA, Inc. application requirements. The objectives of this project were to study the parameters necessary to produce optimized aerogel parts with narrowly specified properties and establish the range and limits of the process for producing such aerogels. The project also included development of new aerogel materials useful for high temperature applications. The results of the project were expected to set the conditions necessary to produce quantities of aerogels having particular specifications such as size,more » shape, density, and mechanical strength. BNA, Inc. terminated the project on April 7, 1999, 10-months prior to the anticipated completion date, due to termination of corporate funding for the project. The technical accomplishments achieved are outlined in Paragraph C below.« less

  10. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    NASA Technical Reports Server (NTRS)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  11. Collaborative Project: Improving the Representation of Coastal and Estuarine Processes in Earth System Models

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bryan, Frank; Dennis, John; MacCready, Parker

    This project aimed to improve long term global climate simulations by resolving and enhancing the representation of the processes involved in the cycling of freshwater through estuaries and coastal regions. This was a collaborative multi-institution project consisting of physical oceanographers, climate model developers, and computational scientists. It specifically targeted the DOE objectives of advancing simulation and predictive capability of climate models through improvements in resolution and physical process representation.

  12. Final Report Collaborative Project: Improving the Representation of Coastal and Estuarine Processes in Earth System Models

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bryan, Frank; Dennis, John; MacCready, Parker

    This project aimed to improve long term global climate simulations by resolving and enhancing the representation of the processes involved in the cycling of freshwater through estuaries and coastal regions. This was a collaborative multi-institution project consisting of physical oceanographers, climate model developers, and computational scientists. It specifically targeted the DOE objectives of advancing simulation and predictive capability of climate models through improvements in resolution and physical process representation.

  13. Validation Process Methods

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lewis, John E.; English, Christine M.; Gesick, Joshua C.

    This report documents the validation process as applied to projects awarded through Funding Opportunity Announcements (FOAs) within the U.S. Department of Energy Bioenergy Technologies Office (DOE-BETO). It describes the procedures used to protect and verify project data, as well as the systematic framework used to evaluate and track performance metrics throughout the life of the project. This report also describes the procedures used to validate the proposed process design, cost data, analysis methodologies, and supporting documentation provided by the recipients.

  14. Project evaluation process manual

    DOT National Transportation Integrated Search

    1997-07-01

    Describes the process for evaluating airport environments, safety standards, airport infrastructure, licensing standards and multitransportational systems. The project rating system is intended to be used for determining state and federal funding.

  15. 36 CFR 218.12 - Timing of authorized hazardous fuel reduction project decision.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE PREDECISIONAL ADMINISTRATIVE REVIEW PROCESSES Predecisional Administrative Review Process for Hazardous Fuel Reduction Projects Authorized by the Healthy Forests Restoration...

  16. Bench-Scale Process for Low-Cost Carbon Dioxide (CO2) Capture Using a Phase-Changing Absorbent

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Westendorf, Tiffany; Caraher, Joel; Chen, Wei

    2015-03-31

    The objective of this project is to design and build a bench-scale process for a novel phase-changing aminosilicone-based CO2-capture solvent. The project will establish scalability and technical and economic feasibility of using a phase-changing CO2-capture absorbent for post-combustion capture of CO2 from coal-fired power plants with 90% capture efficiency and 95% CO2 purity at a cost of $40/tonne of CO2 captured by 2025 and a cost of <$10/tonne of CO2 captured by 2035. In the first budget period of this project, the bench-scale phase-changing CO2 capture process was designed using data and operating experience generated under a previous project (ARPA-emore » project DE-AR0000084). Sizing and specification of all major unit operations was completed, including detailed process and instrumentation diagrams. The system was designed to operate over a wide range of operating conditions to allow for exploration of the effect of process variables on CO2 capture performance.« less

  17. Final Report: Towards an Emergent Model of Technology Adoption for Accelerating the Diffusion of Residential Solar PV

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rai, Varun

    This project sought to enable electric utilities in Texas to accelerate diffusion of residential solar photovoltaic (PV) by systematically identifying and targeting existing barriers to PV adoption. A core goal of the project was to develop an integrated research framework that combines survey research, econometric modeling, financial modeling, and implementation and evaluation of pilot projects to study the PV diffusion system. This project considered PV diffusion as an emergent system, with attention to the interactions between the constituent parts of the PV socio-technical system including: economics of individual decision-making; peer and social influences; behavioral responses; and information and transaction costs.more » We also conducted two pilot projects, which have yielded new insights into behavioral and informational aspects of PV adoption. Finally, this project has produced robust and generalizable results that will provide deeper insights into the technology-diffusion process that will be applicable for the design of utility programs for other technologies such as home-energy management systems and plug-in electric vehicles. When we started this project in 2013 there was little systematic research on characterizing the decision-making process of households interested in adopting PV. This project was designed to fill that research gap by analyzing the PV adoption process from the consumers' decision-making perspective and with the objective to systematically identifying and addressing the barriers that consumers face in the adoption of PV. The two key components of that decision-making process are consumers' evaluation of: (i) uncertainties and non-monetary costs associated with the technology and (ii) the direct monetary cost-benefit. This project used an integrated approach to study both the non-monetary and the monetary components of the consumer decision-making process.« less

  18. A decision support system for map projections of small scale data

    USGS Publications Warehouse

    Finn, Michael P.; Usery, E. Lynn; Posch, Stephan T.; Seong, Jeong Chang

    2004-01-01

    The use of commercial geographic information system software to process large raster datasets of terrain elevation, population, land cover, vegetation, soils, temperature, and rainfall requires both projection from spherical coordinates to plane coordinate systems and transformation from one plane system to another. Decision support systems deliver information resulting in knowledge that assists in policies, priorities, or processes. This paper presents an approach to handling the problems of raster dataset projection and transformation through the development of a Web-enabled decision support system to aid users of transformation processes with the selection of appropriate map projections based on data type, areal extent, location, and preservation properties.

  19. Application of Fuzzy Analytic Hierarchy Process to Building Research Teams

    NASA Astrophysics Data System (ADS)

    Dąbrowski, Karol; Skrzypek, Katarzyna

    2016-03-01

    Building teams has a fundamental impact for execution of research and development projects. The teams appointed for the needs of given projects are based on individuals from both inside and outside of the organization. Knowledge is not only a product available on the market but also an intangible resource affecting their internal and external processes. Thus it is vitally important for businesses and scientific research facilities to effectively manage knowledge within project teams. The article presents a proposal to use Fuzzy AHP (Analytic Hierarchy Process) and ANFIS (Adaptive Neuro Fuzzy Inference System) methods in working groups building for R&D projects on the basis of employees skills.

  20. Creating "Intelligent" Ensemble Averages Using a Process-Based Framework

    NASA Astrophysics Data System (ADS)

    Baker, Noel; Taylor, Patrick

    2014-05-01

    The CMIP5 archive contains future climate projections from over 50 models provided by dozens of modeling centers from around the world. Individual model projections, however, are subject to biases created by structural model uncertainties. As a result, ensemble averaging of multiple models is used to add value to individual model projections and construct a consensus projection. Previous reports for the IPCC establish climate change projections based on an equal-weighted average of all model projections. However, individual models reproduce certain climate processes better than other models. Should models be weighted based on performance? Unequal ensemble averages have previously been constructed using a variety of mean state metrics. What metrics are most relevant for constraining future climate projections? This project develops a framework for systematically testing metrics in models to identify optimal metrics for unequal weighting multi-model ensembles. The intention is to produce improved ("intelligent") unequal-weight ensemble averages. A unique aspect of this project is the construction and testing of climate process-based model evaluation metrics. A climate process-based metric is defined as a metric based on the relationship between two physically related climate variables—e.g., outgoing longwave radiation and surface temperature. Several climate process metrics are constructed using high-quality Earth radiation budget data from NASA's Clouds and Earth's Radiant Energy System (CERES) instrument in combination with surface temperature data sets. It is found that regional values of tested quantities can vary significantly when comparing the equal-weighted ensemble average and an ensemble weighted using the process-based metric. Additionally, this study investigates the dependence of the metric weighting scheme on the climate state using a combination of model simulations including a non-forced preindustrial control experiment, historical simulations, and several radiative forcing Representative Concentration Pathway (RCP) scenarios. Ultimately, the goal of the framework is to advise better methods for ensemble averaging models and create better climate predictions.

  1. Sustainability in Health care by Allocating Resources Effectively (SHARE) 6: investigating methods to identify, prioritise, implement and evaluate disinvestment projects in a local healthcare setting.

    PubMed

    Harris, Claire; Allen, Kelly; Brooke, Vanessa; Dyer, Tim; Waller, Cara; King, Richard; Ramsey, Wayne; Mortimer, Duncan

    2017-05-25

    This is the sixth in a series of papers reporting Sustainability in Health care by Allocating Resources Effectively (SHARE) in a local healthcare setting. The SHARE program was established to investigate a systematic, integrated, evidence-based approach to disinvestment within a large Australian health service. This paper describes the methods employed in undertaking pilot disinvestment projects. It draws a number of lessons regarding the strengths and weaknesses of these methods; particularly regarding the crucial first step of identifying targets for disinvestment. Literature reviews, survey, interviews, consultation and workshops were used to capture and process the relevant information. A theoretical framework was adapted for evaluation and explication of disinvestment projects, including a taxonomy for the determinants of effectiveness, process of change and outcome measures. Implementation, evaluation and costing plans were developed. Four literature reviews were completed, surveys were received from 15 external experts, 65 interviews were conducted, 18 senior decision-makers attended a data gathering workshop, 22 experts and local informants were consulted, and four decision-making workshops were undertaken. Mechanisms to identify disinvestment targets and criteria for prioritisation and decision-making were investigated. A catalogue containing 184 evidence-based opportunities for disinvestment and an algorithm to identify disinvestment projects were developed. An Expression of Interest process identified two potential disinvestment projects. Seventeen additional projects were proposed through a non-systematic nomination process. Four of the 19 proposals were selected as pilot projects but only one reached the implementation stage. Factors with potential influence on the outcomes of disinvestment projects are discussed and barriers and enablers in the pilot projects are summarised. This study provides an in-depth insight into the experience of disinvestment in one local healthcare service. To our knowledge, this is the first paper to report the process of disinvestment from identification, through prioritisation and decision-making, to implementation and evaluation, and finally explication of the processes and outcomes.

  2. The Independent Technical Analysis Process Final Report 2006-2007.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Duberstein, Corey; Ham, Kenneth; Dauble, Dennis

    2007-03-01

    The Bonneville Power Administration (BPA) contracted with the Pacific Northwest National Laboratory (PNNL) to provide technical analytical support for system-wide fish passage information (BPA Project No. 2006-010-00). The goal of this project was to produce rigorous technical analysis products using independent analysts and anonymous peer reviewers. This project provided an independent technical source for non-routine fish passage analyses while allowing routine support functions to be performed by other well-qualified entities. The Independent Technical Analysis Process (ITAP) was created to provide non-routine analysis for fish and wildlife agencies and tribes in particular and the public in general on matters related tomore » juvenile and adult salmon and steelhead passage through the mainstem hydrosystem. The process was designed to maintain the independence of analysts and reviewers from parties requesting analyses, to avoid potential bias in technical products. The objectives identified for this project were to administer a rigorous, transparent process to deliver unbiased technical assistance necessary to coordinate recommendations for storage reservoir and river operations that avoid potential conflicts between anadromous and resident fish. Seven work elements, designated by numbered categories in the Pisces project tracking system, were created to define and accomplish project goals as follows: (1) 118 Coordination - Coordinate technical analysis and review process: (a) Retain expertise for analyst/reviewer roles. (b) Draft research directives. (c) Send directive to the analyst. (d) Coordinate two independent reviews of the draft report. (e) Ensure reviewer comments are addressed within the final report. (2) 162 Analyze/Interpret Data - Implement the independent aspects of the project. (3) 122 Provide Technical Review - Implement the review process for the analysts. (4) 132 Produce Annual Report - FY06 annual progress report with Pisces Disseminate (5) 161 Disseminate Raw/Summary Data and Results - Post technical products on the ITAP web site. (6) 185-Produce Pisces Status Report - Provide periodic status reports to BPA. (7) 119 Manage and Administer Projects - project/contract administration.« less

  3. The Tailoring of Traditional Systems Engineering for the Morpheus Project

    NASA Technical Reports Server (NTRS)

    Devolites, Jennifer L.; Hart, Jeremy J.

    2013-01-01

    NASA's Morpheus Project has developed and tested a prototype planetary lander capable of vertical takeoff and landing that is designed to serve as a testbed for advanced spacecraft technologies. The lander vehicle, propelled by a LOX/Methane engine and sized to carry a 500kg payload to the lunar surface, provides a platform for bringing technologies from the laboratory into an integrated flight system at relatively low cost. From the beginning, one of goals for the Morpheus Project was to streamline agency processes and practices. The Morpheus project accepted a challenge to tailor the traditional NASA systems engineering approach in a way that would be appropriate for a lower cost, rapid prototype engineering effort, but retain the essence of the guiding principles. The team has produced innovative ways to create an infrastructure and approach that would challenge existing systems engineering processes while still enabling successful implementation of the current Morpheus Project. This paper describes the tailored systems engineering approach for the Morpheus project, including the processes, tools, and amount of rigor employed over the project's multiple lifecycles since the project began in FY11. Lessons learned from these trials have the potential to be scaled up and improve efficiency on a larger projects or programs.

  4. 78 FR 65695 - 30-Day Notice of Proposed Information Collection: Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-01

    ... Information Collection: Technical Processing Requirements for Multifamily Project Mortgage Insurance AGENCY: Office of the Chief Information Officer, HUD. ACTION: Correction, notice. SUMMARY: On October 25, 2013 at... Collection Title of Information Collection: Technical Processing Requirements for Multifamily Project...

  5. 75 FR 6683 - Notice of Proposed Information Collection: Comment Request; Technical Processing Requirements for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-10

    ... Information Collection: Comment Request; Technical Processing Requirements for Multifamily Project Mortgage... information: Title of Proposal: Technical Processing Requirements for Multifamily Project Mortgage Insurance... information collection requirement described below will be submitted to the Office of Management and Budget...

  6. Scanning the Images of Science.

    ERIC Educational Resources Information Center

    Greenberg, Richard

    1992-01-01

    The Image Processing Technology Project explores the possibility of using digital image processing in mathematics and science education. Describes the origin of the project and reports the results of a 4-week teacher workshop that trained over 80 teachers in the techniques and technology of image processing. (MDH)

  7. Effects of Person- and Process-Focused Feedback on Prosocial Behavior in Middle Childhood

    PubMed Central

    Dunsmore, Julie C.

    2014-01-01

    Effects of person- and process-focused feedback, parental lay theories, and prosocial self-concept on children’s prosocial behavior were investigated with 143 9- and 10-year-old children who participated in a single session. Parents reported entity (person-focused) and incremental (process-focused) beliefs related to prosocial behavior. Children completed measures of prosocial self-concept, then participated in a virtual online chat with child actors who asked for help with service projects. After completing the chat, children could assist with the service projects. In the first cohort, children were randomly assigned to receive person-focused, process-focused, or control feedback about sympathy. In the second cohort, with newly-recruited families, children received no feedback. When given process-focused feedback, children spent less time spent helping and worked on fewer service projects. When given no feedback, children spent less time helping when parents held incremental (process-focused) beliefs. Children with higher prosocial self-concept who received no feedback worked on more service projects. PMID:25684859

  8. 36 CFR 218.4 - Authorized hazardous fuel reduction projects not subject to objection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SERVICE, DEPARTMENT OF AGRICULTURE PREDECISIONAL ADMINISTRATIVE REVIEW PROCESSES Predecisional Administrative Review Process for Hazardous Fuel Reduction Projects Authorized by the Healthy Forests Restoration...

  9. Software-Engineering Process Simulation (SEPS) model

    NASA Technical Reports Server (NTRS)

    Lin, C. Y.; Abdel-Hamid, T.; Sherif, J. S.

    1992-01-01

    The Software Engineering Process Simulation (SEPS) model is described which was developed at JPL. SEPS is a dynamic simulation model of the software project development process. It uses the feedback principles of system dynamics to simulate the dynamic interactions among various software life cycle development activities and management decision making processes. The model is designed to be a planning tool to examine tradeoffs of cost, schedule, and functionality, and to test the implications of different managerial policies on a project's outcome. Furthermore, SEPS will enable software managers to gain a better understanding of the dynamics of software project development and perform postmodern assessments.

  10. 44 CFR 78.10 - Project grant approval process.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.10 Project grant approval process. The State POC will solicit applications from...

  11. 44 CFR 78.10 - Project grant approval process.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.10 Project grant approval process. The State POC will solicit applications from...

  12. 44 CFR 78.10 - Project grant approval process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.10 Project grant approval process. The State POC will solicit applications from...

  13. 44 CFR 78.10 - Project grant approval process.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.10 Project grant approval process. The State POC will solicit applications from...

  14. 44 CFR 78.10 - Project grant approval process.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF HOMELAND SECURITY INSURANCE AND HAZARD MITIGATION National Flood Insurance Program FLOOD MITIGATION ASSISTANCE § 78.10 Project grant approval process. The State POC will solicit applications from...

  15. Incremental development and prototyping in current laboratory software development projects: Preliminary analysis

    NASA Technical Reports Server (NTRS)

    Griesel, Martha Ann

    1988-01-01

    Several Laboratory software development projects that followed nonstandard development processes, which were hybrids of incremental development and prototyping, are being studied. Factors in the project environment leading to the decision to use a nonstandard development process and affecting its success are analyzed. A simple characterization of project environment based on this analysis is proposed, together with software development approaches which have been found effective for each category. These approaches include both documentation and review requirements.

  16. System verification and validation: a fundamental systems engineering task

    NASA Astrophysics Data System (ADS)

    Ansorge, Wolfgang R.

    2004-09-01

    Systems Engineering (SE) is the discipline in a project management team, which transfers the user's operational needs and justifications for an Extremely Large Telescope (ELT) -or any other telescope-- into a set of validated required system performance characteristics. Subsequently transferring these validated required system performance characteris-tics into a validated system configuration, and eventually into the assembled, integrated telescope system with verified performance characteristics and provided it with "objective evidence that the particular requirements for the specified intended use are fulfilled". The latter is the ISO Standard 8402 definition for "Validation". This presentation describes the verification and validation processes of an ELT Project and outlines the key role System Engineering plays in these processes throughout all project phases. If these processes are implemented correctly into the project execution and are started at the proper time, namely at the very beginning of the project, and if all capabilities of experienced system engineers are used, the project costs and the life-cycle costs of the telescope system can be reduced between 25 and 50 %. The intention of this article is, to motivate and encourage project managers of astronomical telescopes and scientific instruments to involve the entire spectrum of Systems Engineering capabilities performed by trained and experienced SYSTEM engineers for the benefit of the project by explaining them the importance of Systems Engineering in the AIV and validation processes.

  17. Advanced in-duct sorbent injection for SO{sub 2} control. Final technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stouffer, M.R.; Withium, J.A.; Rosenhoover, W.A.

    1994-12-01

    The objective of this research project was to develop a second generation duct sorbent injection technology as a cost-effective compliance option for the 1990 Clean Air Act Amendments. Research and development work was focused on the Advanced Coolside process, which showed the potential for exceeding the original performance targets of 90% SO{sub 2} removal and 60% sorbent utilization. Process development was conducted in a 1000 acfm pilot plant. The pilot plant testing showed that the Advanced Coolside process can achieve 90% SO{sub 2} removal at sorbent utilizations up to 75%. The testing also showed that the process has the potentialmore » to achieve very high removal efficiency (90 to >99%). By conducting conceptual process design and economic evaluations periodically during the project, development work was focused on process design improvements which substantially lowered process capital and operating costs, A final process economic study projects capital costs less than one half of those for limestone forced oxidation wet FGD. Projected total SO{sub 2} control cost is about 25% lower than wet FGD for a 260 MWe plant burning a 2.5% sulfur coal. A waste management study showed the acceptability of landfill disposal; it also identified a potential avenue for by-product utilization which should be further investigated. Based on the pilot plant performance and on the above economic projections, future work to scale up the Advanced Coolside process is recommended.« less

  18. Project C-018H, 242-A Evaporator/PUREX Plant Process Condensate Treatment Facility, functional design criteria. Revision 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sullivan, N.

    1995-05-02

    This document provides the Functional Design Criteria (FDC) for Project C-018H, the 242-A Evaporator and Plutonium-Uranium Extraction (PUREX) Plant Condensate Treatment Facility (Also referred to as the 200 Area Effluent Treatment Facility [ETF]). The project will provide the facilities to treat and dispose of the 242-A Evaporator process condensate (PC), the Plutonium-Uranium Extraction (PUREX) Plant process condensate (PDD), and the PUREX Plant ammonia scrubber distillate (ASD).

  19. Transition from in-hospital ventilation to home ventilation: process description and quality indicators

    PubMed Central

    Kastrup, Marc; Tittmann, Benjamin; Sawatzki, Tanja; Gersch, Martin; Vogt, Charlotte; Rosenthal, Max; Rosseau, Simone; Spies, Claudia

    2017-01-01

    The current demographic development of our society results in an increasing number of elderly patients with chronic diseases being treated in the intensive care unit. A possible long-term consequence of such a treatment is that patients remain dependent on certain invasive organ support systems, such as long-term ventilator dependency. The main goal of this project is to define the transition process between in-hospital and out of hospital (ambulatory) ventilator support. A further goal is to identify evidence-based quality indicators to help define and describe this process. This project describes an ideal sequence of processes (process chain), based on the current evidence from the literature. Besides the process chain, key data and quality indicators were described in detail. Due to the limited project timeline, these indicators were not extensively tested in the clinical environment. The results of this project may serve as a solid basis for proof of feasibility and proof of concept investigations, optimize the transition process of ventilator-dependent patients from a clinical to an ambulatory setting, as well as reduce the rate of emergency re-admissions. PMID:29308061

  20. 75 FR 70224 - New York Tidal Energy Company; Notice Concluding Pre-Filing Process and Approving Process Plan...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12665-003] New York Tidal... Tidal Energy Company. e. Name of Project: East River Tidal Energy Pilot Project. f. Location: In the.... Filed Pursuant to: 18 CFR 5.3 of the Commission's regulations. h. Applicant Contact: Daniel Power...

  1. Statistical Process Control. A Summary. FEU/PICKUP Project Report.

    ERIC Educational Resources Information Center

    Owen, M.; Clark, I.

    A project was conducted to develop a curriculum and training materials to be used in training industrial operatives in statistical process control (SPC) techniques. During the first phase of the project, questionnaires were sent to 685 companies (215 of which responded) to determine where SPC was being used, what type of SPC firms needed, and how…

  2. The Rehabilitation Project in Data Processing: A Prototype Demonstration Project of University, State Government and Industrial Cooperation.

    ERIC Educational Resources Information Center

    White, Robert C.; Cormier, Robert J., Eds.

    1986-01-01

    In cooperation with the Maine Bureau of Rehabilitation, the University of Maine established the Rehabilitation Project in Data Processing in 1978 to train physically handicapped individuals to become business application computer programmers. Discusses various aspects of the program, considered one of the most successful rehabilitation programs in…

  3. The 300 Area Integrated Field Research Challenge Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    Pacific Northwest National Laboratory and a group of expert collaborators are using the U.S. Department of Energy Hanford Site 300 Area uranium plume within the footprint of the 300-FF-5 groundwater operable unit as a site for an Integrated Field-Scale Subsurface Research Challenge (IFRC). The IFRC is entitled Multi-Scale Mass Transfer Processes Controlling Natural Attenuation and Engineered Remediation: An IFRC Focused on the Hanford Site 300 Area Uranium Plume Project. The theme is investigation of multi-scale mass transfer processes. A series of forefront science questions on mass transfer are posed for research that relate to the effect of spatial heterogeneities; themore » importance of scale; coupled interactions between biogeochemical, hydrologic, and mass transfer processes; and measurements/approaches needed to characterize and model a mass transfer-dominated system. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the 300 Area IFRC Project. This plan is designed to be used exclusively by project staff.« less

  4. Constructability issues on KyTC projects.

    DOT National Transportation Integrated Search

    2003-07-01

    A successful constructibility review process for a transportation agency must follow an established methodology similar to value engineering. The process must be flexible and address the critical issues impacting transportation construction projects,...

  5. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated...-Federal sponsor shall develop a Project Management Plan as described in § 385.24. (c) Project...

  6. Including hydrological self-regulating processes in peatland models: Effects on peatmoss drought projections.

    PubMed

    Nijp, Jelmer J; Metselaar, Klaas; Limpens, Juul; Teutschbein, Claudia; Peichl, Matthias; Nilsson, Mats B; Berendse, Frank; van der Zee, Sjoerd E A T M

    2017-02-15

    The water content of the topsoil is one of the key factors controlling biogeochemical processes, greenhouse gas emissions and biosphere - atmosphere interactions in many ecosystems, particularly in northern peatlands. In these wetland ecosystems, the water content of the photosynthetic active peatmoss layer is crucial for ecosystem functioning and carbon sequestration, and is sensitive to future shifts in rainfall and drought characteristics. Current peatland models differ in the degree in which hydrological feedbacks are included, but how this affects peatmoss drought projections is unknown. The aim of this paper was to systematically test whether the level of hydrological detail in models could bias projections of water content and drought stress for peatmoss in northern peatlands using downscaled projections for rainfall and potential evapotranspiration in the current (1991-2020) and future climate (2061-2090). We considered four model variants that either include or exclude moss (rain)water storage and peat volume change, as these are two central processes in the hydrological self-regulation of peatmoss carpets. Model performance was validated using field data of a peatland in northern Sweden. Including moss water storage as well as peat volume change resulted in a significant improvement of model performance, despite the extra parameters added. The best performance was achieved if both processes were included. Including moss water storage and peat volume change consistently reduced projected peatmoss drought frequency with >50%, relative to the model excluding both processes. Projected peatmoss drought frequency in the growing season was 17% smaller under future climate than current climate, but was unaffected by including the hydrological self-regulating processes. Our results suggest that ignoring these two fine-scale processes important in hydrological self-regulation of northern peatlands will have large consequences for projected climate change impact on ecosystem processes related to topsoil water content, such as greenhouse gas emissions. Copyright © 2016 Elsevier B.V. All rights reserved.

  7. Can citizen science enhance public understanding of science?

    PubMed

    Bonney, Rick; Phillips, Tina B; Ballard, Heidi L; Enck, Jody W

    2016-01-01

    Over the past 20 years, thousands of citizen science projects engaging millions of participants in collecting and/or processing data have sprung up around the world. Here we review documented outcomes from four categories of citizen science projects which are defined by the nature of the activities in which their participants engage - Data Collection, Data Processing, Curriculum-based, and Community Science. We find strong evidence that scientific outcomes of citizen science are well documented, particularly for Data Collection and Data Processing projects. We find limited but growing evidence that citizen science projects achieve participant gains in knowledge about science knowledge and process, increase public awareness of the diversity of scientific research, and provide deeper meaning to participants' hobbies. We also find some evidence that citizen science can contribute positively to social well-being by influencing the questions that are being addressed and by giving people a voice in local environmental decision making. While not all citizen science projects are intended to achieve a greater degree of public understanding of science, social change, or improved science -society relationships, those projects that do require effort and resources in four main categories: (1) project design, (2) outcomes measurement, (3) engagement of new audiences, and (4) new directions for research. © The Author(s) 2015.

  8. Draft project management update to the Iowa DOT Project Development Manual : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  9. Developing the JPL Engineering Processes

    NASA Technical Reports Server (NTRS)

    Linick, Dave; Briggs, Clark

    2004-01-01

    This paper briefly recounts the recent history of process reengineering at the NASA Jet Propulsion Laboratory, with a focus on the engineering processes. The JPL process structure is described and the process development activities of the past several years outlined. The main focus of the paper is on the current process structure, the emphasis on the flight project life cycle, the governance approach that lead to Flight Project Practices, and the remaining effort to capture process knowledge at the detail level of the work group.

  10. Rankings in Institutional Strategies and Processes: Impact or Illusion?

    ERIC Educational Resources Information Center

    Hazelkorn, Ellen; Loukkola, Tia; Zhang, Thérèse

    2014-01-01

    The "Rankings in Institutional Strategies and Processes" (RISP) project is the first pan-European study of the impact and influence of rankings on European higher education institutions. The project has sought to build understanding of how rankings impact and influence the development of institutional strategies and processes and its…

  11. Image Processing for Teaching: Transforming a Scientific Research Tool into an Educational Technology.

    ERIC Educational Resources Information Center

    Greenberg, Richard

    1998-01-01

    Describes the Image Processing for Teaching (IPT) project which provides digital image processing to excite students about science and mathematics as they use research-quality software on microcomputers. Provides information on IPT whose components of this dissemination project have been widespread teacher education, curriculum-based materials…

  12. 36 CFR 218.5 - Giving notice of proposed authorized hazardous fuel reduction projects subject to objection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Public Property FOREST SERVICE, DEPARTMENT OF AGRICULTURE PREDECISIONAL ADMINISTRATIVE REVIEW PROCESSES Predecisional Administrative Review Process for Hazardous Fuel Reduction Projects Authorized by the Healthy... subject to the objection process pursuant to 36 CFR part 218, subpart A, and include the following: (i...

  13. Project Bank: Word Processing on Campus.

    ERIC Educational Resources Information Center

    Hlavin, Robert F.

    Project Bank was initiated at Triton College (Illinois) to increase student awareness of the merits of word processing as it affects their class work and related assignments; to make faculty aware of advances in word processing programs; and to increase the utilization of the college's computer laboratory. All fall 1985 incoming freshmen were…

  14. Environmental Data Flow Six Sigma Process Improvement Savings Overview

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Paige, Karen S

    An overview of the Environmental Data Flow Six Sigma improvement project covers LANL’s environmental data processing following receipt from the analytical laboratories. The Six Sigma project identified thirty-three process improvements, many of which focused on cutting costs or reducing the time it took to deliver data to clients.

  15. Including information technology project management in the nursing informatics curriculum.

    PubMed

    Sockolow, Paulina; Bowles, Kathryn H

    2008-01-01

    Project management is a critical skill for nurse informaticists who are in prominent roles developing and implementing clinical information systems. It should be included in the nursing informatics curriculum, as evidenced by its inclusion in informatics competencies and surveys of important skills for informaticists. The University of Pennsylvania School of Nursing includes project management in two of the four courses in the master's level informatics minor. Course content includes the phases of the project management process; the iterative unified process methodology; and related systems analysis and project management skills. During the introductory course, students learn about the project plan, requirements development, project feasibility, and executive summary documents. In the capstone course, students apply the system development life cycle and project management skills during precepted informatics projects. During this in situ experience, students learn, the preceptors benefit, and the institution better prepares its students for the real world.

  16. Evaluation of the Three Gorges Dam project using multi-criteria analysis (MCA) based on a sustainable perspective

    NASA Astrophysics Data System (ADS)

    Han, Yue; Zheng, Wei; Guo, Junshan; Ma, Yihe; Ding, Junqi; Zhu, Lingkai; Che, Yongqiang; Zhang, Yanpeng

    2018-02-01

    Abstract . The Three Gorges dam of China is one of the largest and expensive hydropower projects of the world. The four main purposes of the project are flood control,energy production, improved navigation and fresh water supply. The dam project has been completed and running successfully with the potential benefits. However, this project is still a controversial issue among many environmentalists and socialists due to various impacts. This study focuses on the benefit and the impacts of the project, and also evaluates the performance of the project using multi-criteria analysis (MCA) approach from a sustainable perspective. Different sustainability criteria related with the dam project have been identified and used for the ranking and rating process. The final result of MCA comes with this scoring process and pairwise comparison, which evaluates the performance of the project considering different positive and negative aspects.

  17. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  18. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  19. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  20. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  1. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  2. A Largely Unsatisfied Need: Continuing Professional Development for Process and Process Plant Industries. A Summary. FEU/PICKUP Project Report.

    ERIC Educational Resources Information Center

    Geldhart, D.; Brown, A. S.

    This summary report outlines the aims of a project that focused on provision of short courses for technical professionals in the chemical and allied process industry and the process plant industry. Continuing education needs of both companies and individuals, as well as corporate policies and attitudes toward continuing education and constraints…

  3. WISE: Automated support for software project management and measurement. M.S. Thesis

    NASA Technical Reports Server (NTRS)

    Ramakrishnan, Sudhakar

    1995-01-01

    One important aspect of software development and IV&V is measurement. Unless a software development effort is measured in some way, it is difficult to judge the effectiveness of current efforts and predict future performances. Collection of metrics and adherence to a process are difficult tasks in a software project. Change activity is a powerful indicator of project status. Automated systems that can handle change requests, issues, and other process documents provide an excellent platform for tracking the status of the project. A World Wide Web based architecture is developed for (a) making metrics collection an implicit part of the software process, (b) providing metric analysis dynamically, (c) supporting automated tools that can complement current practices of in-process improvement, and (d) overcoming geographical barrier. An operational system (WISE) instantiates this architecture allowing for the improvement of software process in a realistic environment. The tool tracks issues in software development process, provides informal communication between the users with different roles, supports to-do lists (TDL), and helps in software process improvement. WISE minimizes the time devoted to metrics collection, analysis, and captures software change data. Automated tools like WISE focus on understanding and managing the software process. The goal is improvement through measurement.

  4. The NASA/DOD aerospace knowledge diffusion research project: A research agenda

    NASA Technical Reports Server (NTRS)

    Pinelli, Thomas E.; Kennedy, John M.

    1990-01-01

    The project has both immediate and long term purposes. In the first instance it provides a practical and pragmatic basis for understanding how the results of NASA/DoD research diffuse into the aerospace R and D process. Over the long term it provides an empirical basis for understanding the aerospace knowledge diffusion process itself, and its implications at the individual, organizational, national, and international levels. The project is studying the major barriers to effective knowledge diffusion. This project will provide descriptive and analytical data regarding the flow of scientific and technical information (STI). It will examine both channels used to communicate information and the social system of the aerospace knowledge diffusion process.

  5. Research a Novel Integrated and Dynamic Multi-object Trade-Off Mechanism in Software Project

    NASA Astrophysics Data System (ADS)

    Jiang, Weijin; Xu, Yuhui

    Aiming at practical requirements of present software project management and control, the paper presented to construct integrated multi-object trade-off model based on software project process management, so as to actualize integrated and dynamic trade-oil of the multi-object system of project. Based on analyzing basic principle of dynamic controlling and integrated multi-object trade-off system process, the paper integrated method of cybernetics and network technology, through monitoring on some critical reference points according to the control objects, emphatically discussed the integrated and dynamic multi- object trade-off model and corresponding rules and mechanism in order to realize integration of process management and trade-off of multi-object system.

  6. Role of Hydrogeology in Professional Environmental Projects

    EPA Science Inventory

    The purpose of this presentation is to acquaint hydrogeology students how hydrogeological principles are applied in environmental engineering projects. This presentation outlines EPA's Superfund processes of site characterization, feasibility studies, and remediation processes.

  7. Research Projects and Undergraduate Retention at the University of Arizona

    NASA Astrophysics Data System (ADS)

    Walker-LaFollette, Amanda; Hardegree-Ullman, K.; Towner, A. P.; McGraw, A. M.; Biddle, L. I.; Robertson, A.; Turner, J.; Smith, C.

    2013-06-01

    The University of Arizona’s Astronomy Club utilizes its access to the many telescopes in and around Tucson, Arizona, to allow students to fully participate in a variety of research projects. Three current projects - the exoplanet project, the radio astronomy project, and the Kepler project - all work to give undergraduates who are interested in astronomy the opportunity to explore practical astronomy outside the classroom and in a peer-supported environment. The exoplanet project strives to teach students about the research process, including observing exoplanet transits on the Steward Observatory 61” Kuiper telescope on Mt. Bigelow in Tucson, AZ, reducing the data into lightcurves with the Image Reduction and Analysis Facility (IRAF), modeling the lightcurves using the Interactive Data Language (IDL), and writing and publishing a professional paper, and does it all with no faculty involvement. The radio astronomy project is designed to provide students with an opportunity to work with a professor on a radio astronomy research project, and to learn about the research process, including observing molecules in molecular clouds using the Arizona Radio Observatory 12-meter radio telescope on Kitt Peak in Arizona. The Kepler project is a new project designed in part to facilitate graduate-undergraduate interaction in the Astronomy Department, and in part to allow students (both graduate and undergraduate) to participate in star-spot cycle research using data from the Kepler Mission. All of these research projects and structures provide students with unique access to telescopes, peer mentoring, networking, and understanding the entire process of astronomical research.

  8. Orienting and Onboarding Clinical Nurse Specialists: A Process Improvement Project.

    PubMed

    Garcia, Mayra G; Watt, Jennifer L; Falder-Saeed, Karie; Lewis, Brennan; Patton, Lindsey

    Clinical nurse specialists (CNSs) have a unique advanced practice role. This article describes a process useful in establishing a comprehensive orientation and onboarding program for a newly hired CNS. The project team used the National Association of Clinical Nurse Specialists core competencies as a guide to construct a process for effectively onboarding and orienting newly hired CNSs. Standardized documents were created for the orientation process including a competency checklist, needs assessment template, and professional evaluation goals. In addition, other documents were revised to streamline the orientation process. Standardizing the onboarding and orientation process has demonstrated favorable results. As of 2016, 3 CNSs have successfully been oriented and onboarded using the new process. Unique healthcare roles require special focus when onboarding and orienting into a healthcare system. The use of the National Association of Clinical Nurse Specialists core competencies guided the project in establishing a successful orientation and onboarding process for newly hired CNSs.

  9. 39 CFR 778.7 - How does the Postal Service communicate with state and local officials concerning the Postal...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... notice directly to affected state, areawide, regional, and local entities in a state of a proposed direct Federal development project if: (1) The state has not adopted a process under the Order; or (2) The development project involves a facility project action category not selected for the state process. This...

  10. Memories in Motion: Learning, Process, History and Art in Public Space

    ERIC Educational Resources Information Center

    Qadri, Debbie

    2015-01-01

    This essay presents an art project as an example of two aspects of public pedagogy. The first, is that the project critically examined how history is made, and through art-making and installation it performed an alternative publishing of history. Secondly, the art project was utilised as both a process and outcome within public space, and through…

  11. Using Project- and Theme-Based Learning to Encourage Creativity in Science

    ERIC Educational Resources Information Center

    Vaidya, Ashwin

    2015-01-01

    In this article, the authors describe a project that was developed for an introductory-level physics course. The aim of the project was to encourage the creative process in science, as science is seldom mentioned in discussions about creativity. They sought to engage students in the creative process by posing a collective challenge to the class.…

  12. Attaining and maintaining data integrity with configuration management

    NASA Astrophysics Data System (ADS)

    Huffman, Dorothy J.; Jeane, Shirley A.

    1993-08-01

    Managers and scientists are concerned about data integrity because they draw conclusions from data that can have far reaching effects. Projects managers use Configuration Management to insure that hardware, software, and project information are controlled. They have not, as yet, applied its rigorously to data. However, there is ample opportunity in the data collection and production process to jeopardize data integrity. Environmental changes, tampering and production problems can all affect data integrity. There are four functions included in the Configuration Management process: configuration identification, control, auditing and status accounting. These functions provide management the means to attain data integrity and the visibility into engineering processes needed to maintain data integrity. When project managers apply Configuration Management processes to data, the data user can trace back through history to validate data integrity. The user knows that the project allowed only orderly changes to the data. He is assured that project personnel followed procedures to maintain data quality. He also has access to status information about the data. The user receives data products with a known integrity level and a means to assess the impact of past events ont he conclusions derived from the data. To obtain these benefits, project managers should apply the Configuration Management discipline to data.

  13. Do PEV Drivers Park Near Publicly Accessible EVSE in San Diego but Not Use Them?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Francfort, James Edward

    The PEV charging stations deployed as part of The EV Project included both residential and non-residential sites. Non-residential sites included EVSE installed in workplace environments, fleet applications and those that were publicly accessible near retail centers, parking lots, and similar locations. The EV Project utilized its Micro-Climate® planning process to determine potential sites for publicly accessible EVSE in San Diego. This process worked with local stakeholders to target EVSE deployment near areas where significant PEV traffic and parking was expected. This planning process is described in The Micro-Climate deployment Process in San Diego1. The EV Project issued its deployment planmore » for San Diego in November 2010, prior to the sale of PEVs by Nissan and Chevrolet. The Project deployed residential EVSE concurrent with vehicle delivery starting in December 2010. The installation of non-residential EVSE commenced in April 2011 consistent with the original Project schedule, closely following the adoption of PEVs. The residential participation portion of The EV Project was fully subscribed by January 2013 and the non-residential EVSE deployment was essentially completed by August 2013.« less

  14. Supporting the Future Air Traffic Control Projection Process

    NASA Technical Reports Server (NTRS)

    Davison, Hayley J.; Hansman, R. John, Jr.

    2002-01-01

    In air traffic control, projecting what the air traffic situation will be over the next 30 seconds to 30 minutes is a key process in identifying conflicts that may arise so that evasive action can be taken upon discovery of these conflicts. A series of field visits in the Boston and New York terminal radar approach control (TRACON) facilities and in the oceanic air traffic control facilities in New York and Reykjavik, Iceland were conducted to investigate the projection process in two different ATC domains. The results from the site visits suggest that two types of projection are currently used in ATC tasks, depending on the type of separation minima and/or traffic restriction and information display used by the controller. As technologies improve and procedures change, care should be taken by designers to support projection through displays, automation, and procedures. It is critical to prevent time/space mismatches between interfaces and restrictions. Existing structure in traffic dynamics could be utilized to provide controllers with useful behavioral models on which to build projections. Subtle structure that the controllers are unable to internalize could be incorporated into an ATC projection aid.

  15. [Improving the continuous care process in primary care during weekends and holidays: redesigning and FMEA].

    PubMed

    Cañada Dorado, A; Cárdenas Valladolid, J; Espejo Matorrales, F; García Ferradal, I; Sastre Páez, S; Vicente Martín, I

    2010-01-01

    To describe a project carried out in order to improve the process of Continuous Health Care (CHC) on Saturdays and bank holidays in Primary Care, area number 4, Madrid. The aim of this project was to guarantee a safe and error-free service to patients receiving home health care on weekends. The urgent need for improving CHC process was identified by the Risk Management Functional Unit (RMFU) of the area. In addition, some complaints had been received from the nurses involved in the process as well as from their patients. A SWOT (Strengths, Weaknesses, Opportunities and Threats) analysis performed in 2009 highlighted a number of problems with the process. As a result, a project for improvement was drawn up, to be implemented in the following stages: 1. Redesigning and improving the existing process. 2. Application of failure mode and effect analysis (FMEA) to the new process. 3. Follow up, managing and leading the project. 4. Nurse training. 5. Implementing the process in the whole area. 6. CHC nurse satisfaction surveys. After carrying out this project, the efficiency and level of automation improved considerably. Since implementation of the process enhancement measures, no complaints have been received from patients and surveys show that CHC nurse satisfaction has improved. By using FMEA, errors were given priority and enhancement steps were taken in order to: Inform professionals, back-up personnel and patients about the process. Improve the specialist follow-up report. Provide training in ulcer patient care. The process enhancement, and especially its automation, has resulted in a significant step forward toward achieving greater patient safety. FMEA was a useful tool, which helped in taking some important actions. Finally, CHC nurse satisfaction has clearly improved. Copyright © 2009 SECA. Published by Elsevier Espana. All rights reserved.

  16. Quality initiatives: planning, setting up, and carrying out radiology process improvement projects.

    PubMed

    Tamm, Eric P; Szklaruk, Janio; Puthooran, Leejo; Stone, Danna; Stevens, Brian L; Modaro, Cathy

    2012-01-01

    In the coming decades, those who provide radiologic imaging services will be increasingly challenged by the economic, demographic, and political forces affecting healthcare to improve their efficiency, enhance the value of their services, and achieve greater customer satisfaction. It is essential that radiologists master and consistently apply basic process improvement skills that have allowed professionals in many other fields to thrive in a competitive environment. The authors provide a step-by-step overview of process improvement from the perspective of a radiologic imaging practice by describing their experience in conducting a process improvement project: to increase the daily volume of body magnetic resonance imaging examinations performed at their institution. The first step in any process improvement project is to identify and prioritize opportunities for improvement in the work process. Next, an effective project team must be formed that includes representatives of all participants in the process. An achievable aim must be formulated, appropriate measures selected, and baseline data collected to determine the effects of subsequent efforts to achieve the aim. Each aspect of the process in question is then analyzed by using appropriate tools (eg, flowcharts, fishbone diagrams, Pareto diagrams) to identify opportunities for beneficial change. Plans for change are then established and implemented with regular measurements and review followed by necessary adjustments in course. These so-called PDSA (planning, doing, studying, and acting) cycles are repeated until the aim is achieved or modified and the project closed.

  17. Chevron: Refinery Identifies $4.4 Million in Annual Savings by Using Process Simulation Models to Perform Energy-Efficiency Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    2004-05-01

    In an energy-efficiency study at its refinery near Salt Lake City, Utah, Chevron focused on light hydrocarbons processing. The company found it could recover hydrocarbons from its fuel gas system and sell them. By using process simulation models of special distillation columns and associated reboilers and condensers, Chevron could predict the performance of potential equipment configuration changes and process modifications. More than 25,000 MMBtu in natural gas could be saved annually if a debutanizer upgrade project and a new saturated gas plant project were completed. Together, these projects would save $4.4 million annually.

  18. Computer-aided software development process design

    NASA Technical Reports Server (NTRS)

    Lin, Chi Y.; Levary, Reuven R.

    1989-01-01

    The authors describe an intelligent tool designed to aid managers of software development projects in planning, managing, and controlling the development process of medium- to large-scale software projects. Its purpose is to reduce uncertainties in the budget, personnel, and schedule planning of software development projects. It is based on dynamic model for the software development and maintenance life-cycle process. This dynamic process is composed of a number of time-varying, interacting developmental phases, each characterized by its intended functions and requirements. System dynamics is used as a modeling methodology. The resulting Software LIfe-Cycle Simulator (SLICS) and the hybrid expert simulation system of which it is a subsystem are described.

  19. A process dissociation approach to objective-projective test score interrelationships.

    PubMed

    Bornstein, Robert F

    2002-02-01

    Even when self-report and projective measures of a given trait or motive both predict theoretically related features of behavior, scores on the 2 tests correlate modestly with each other. This article describes a process dissociation framework for personality assessment, derived from research on implicit memory and learning, which can resolve these ostensibly conflicting results. Research on interpersonal dependency is used to illustrate 3 key steps in the process dissociation approach: (a) converging behavioral predictions, (b) modest test score intercorrelations, and (c) delineation of variables that differentially affect self-report and projective test scores. Implications of the process dissociation framework for personality assessment and test development are discussed.

  20. Hypothalamic Projections to the Optic Tectum in Larval Zebrafish

    PubMed Central

    Heap, Lucy A.; Vanwalleghem, Gilles C.; Thompson, Andrew W.; Favre-Bulle, Itia; Rubinsztein-Dunlop, Halina; Scott, Ethan K.

    2018-01-01

    The optic tectum of larval zebrafish is an important model for understanding visual processing in vertebrates. The tectum has been traditionally viewed as dominantly visual, with a majority of studies focusing on the processes by which tectal circuits receive and process retinally-derived visual information. Recently, a handful of studies have shown a much more complex role for the optic tectum in larval zebrafish, and anatomical and functional data from these studies suggest that this role extends beyond the visual system, and beyond the processing of exclusively retinal inputs. Consistent with this evolving view of the tectum, we have used a Gal4 enhancer trap line to identify direct projections from rostral hypothalamus (RH) to the tectal neuropil of larval zebrafish. These projections ramify within the deepest laminae of the tectal neuropil, the stratum album centrale (SAC)/stratum griseum periventriculare (SPV), and also innervate strata distinct from those innervated by retinal projections. Using optogenetic stimulation of the hypothalamic projection neurons paired with calcium imaging in the tectum, we find rebound firing in tectal neurons consistent with hypothalamic inhibitory input. Our results suggest that tectal processing in larval zebrafish is modulated by hypothalamic inhibitory inputs to the deep tectal neuropil. PMID:29403362

  1. Hypothalamic Projections to the Optic Tectum in Larval Zebrafish.

    PubMed

    Heap, Lucy A; Vanwalleghem, Gilles C; Thompson, Andrew W; Favre-Bulle, Itia; Rubinsztein-Dunlop, Halina; Scott, Ethan K

    2017-01-01

    The optic tectum of larval zebrafish is an important model for understanding visual processing in vertebrates. The tectum has been traditionally viewed as dominantly visual, with a majority of studies focusing on the processes by which tectal circuits receive and process retinally-derived visual information. Recently, a handful of studies have shown a much more complex role for the optic tectum in larval zebrafish, and anatomical and functional data from these studies suggest that this role extends beyond the visual system, and beyond the processing of exclusively retinal inputs. Consistent with this evolving view of the tectum, we have used a Gal4 enhancer trap line to identify direct projections from rostral hypothalamus (RH) to the tectal neuropil of larval zebrafish. These projections ramify within the deepest laminae of the tectal neuropil, the stratum album centrale (SAC)/stratum griseum periventriculare (SPV), and also innervate strata distinct from those innervated by retinal projections. Using optogenetic stimulation of the hypothalamic projection neurons paired with calcium imaging in the tectum, we find rebound firing in tectal neurons consistent with hypothalamic inhibitory input. Our results suggest that tectal processing in larval zebrafish is modulated by hypothalamic inhibitory inputs to the deep tectal neuropil.

  2. Quantifying, Visualizing, and Monitoring Lead Optimization.

    PubMed

    Maynard, Andrew T; Roberts, Christopher D

    2016-05-12

    Although lead optimization (LO) is by definition a process, process-centric analysis and visualization of this important phase of pharmaceutical R&D has been lacking. Here we describe a simple statistical framework to quantify and visualize the progression of LO projects so that the vital signs of LO convergence can be monitored. We refer to the resulting visualizations generated by our methodology as the "LO telemetry" of a project. These visualizations can be automated to provide objective, holistic, and instantaneous analysis and communication of LO progression. This enhances the ability of project teams to more effectively drive LO process, while enabling management to better coordinate and prioritize LO projects. We present the telemetry of five LO projects comprising different biological targets and different project outcomes, including clinical compound selection, termination due to preclinical safety/tox, and termination due to lack of tractability. We demonstrate that LO progression is accurately captured by the telemetry. We also present metrics to quantify LO efficiency and tractability.

  3. Project Panama: An International Service Project

    ERIC Educational Resources Information Center

    Aydlett, Lydia; Randolph, Mickey; Wells, Gayle

    2010-01-01

    Participation in service learning projects is a growing phenomenon at universities and colleges. Research indicates service projects are beneficial for college students and adults. There is little data investigating developmental differences in how younger versus older participants perceive the service learning process. In this project, older…

  4. Polyfire project- an example of an industrial research project promoting safe industrial production of fire-resistant nanocomposites

    NASA Astrophysics Data System (ADS)

    Vaquero, C.; López de Ipiña, J.; Galarza, N.; Hargreaves, B.; Weager, B.; Breen, C.

    2011-07-01

    New developments based on nanotechnology have to guarantee safe products and processes to be accepted by society. The Polyfire project will develop and scale-up techniques for processing halogen-free, fire-retardant nanocomposite materials and coatings based on unsaturated polyester resins and organoclays. The project includes a work package that will assess the Health and Environmental impacts derived from the manipulation of nanoparticles. This work package includes the following tasks: (1) Identification of Health and Environment Impacts derived from the processes, (2) Experimentation to study specific Nanoparticle Emissions, (3) Development of a Risk Management Methodology for the process, and (4) A Comparison of the Health and Environmental Impact of New and Existing Materials. To date, potential exposure scenarios to nanomaterials have been identified through the development of a Preliminary Hazard Analysis (PHA) of the new production processes. In the next step, these scenarios will be studied and simulated to evaluate potential emissions of nanomaterials. Polyfire is a collaborative European project, funded by the European Commission 7th Framework Programme (Grant Agreement No 229220). It features 11 partners from 5 countries (5 SMEs, 3 research institutes, 2 large companies, 1 association) and runs for three years (1st September 2009 - 31st August 2012). This project is an example of an industrial research development which aims to introduce to the market new products promoting the safe use of nanomaterials.

  5. Automated fiber placement: Evolution and current demonstrations

    NASA Technical Reports Server (NTRS)

    Grant, Carroll G.; Benson, Vernon M.

    1993-01-01

    The automated fiber placement process has been in development at Hercules since 1980. Fiber placement is being developed specifically for aircraft and other high performance structural applications. Several major milestones have been achieved during process development. These milestones are discussed in this paper. The automated fiber placement process is currently being demonstrated on the NASA ACT program. All demonstration projects to date have focused on fiber placement of transport aircraft fuselage structures. Hercules has worked closely with Boeing and Douglas on these demonstration projects. This paper gives a description of demonstration projects and results achieved.

  6. Creativity Processes of Students in the Design Studio

    ERIC Educational Resources Information Center

    Huber, Amy Mattingly; Leigh, Katharine E.; Tremblay, Kenneth R., Jr.

    2012-01-01

    The creative process is a multifaceted and dynamic path of thinking required to execute a project in design-based disciplines. The goal of this research was to test a model outlining the creative design process by investigating student experiences in a design project assignment. The study used an exploratory design to collect data from student…

  7. Project T.E.A.M. (Technical Education Advancement Modules). Advanced Statistical Process Control.

    ERIC Educational Resources Information Center

    Dunlap, Dale

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 20-hour advanced statistical process control (SPC) and quality improvement course designed to develop the following competencies: (1) understanding quality systems; (2) knowing the process; (3) solving quality problems; and (4)…

  8. VCM Process Design: An ABET 2000 Fully Compliant Project

    ERIC Educational Resources Information Center

    Benyahia, Farid

    2005-01-01

    A long experience in undergraduate vinyl chloride monomer (VCM) process design projects is shared in this paper. The VCM process design is shown to be fully compliant with ABET 2000 criteria by virtue of its abundance in chemical engineering principles, integration of interpersonal and interdisciplinary skills in design, safety, economics, and…

  9. 50 CFR 86.61 - What process does the Service use to select projects for grants?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 50 Wildlife and Fisheries 6 2010-10-01 2010-10-01 false What process does the Service use to....61 What process does the Service use to select projects for grants? The Service's Division of Federal... SERVICE, DEPARTMENT OF THE INTERIOR (CONTINUED) FINANCIAL ASSISTANCE-WILDLIFE SPORT FISH RESTORATION...

  10. The TAME Project: Towards improvement-oriented software environments

    NASA Technical Reports Server (NTRS)

    Basili, Victor R.; Rombach, H. Dieter

    1988-01-01

    Experience from a dozen years of analyzing software engineering processes and products is summarized as a set of software engineering and measurement principles that argue for software engineering process models that integrate sound planning and analysis into the construction process. In the TAME (Tailoring A Measurement Environment) project at the University of Maryland, such an improvement-oriented software engineering process model was developed that uses the goal/question/metric paradigm to integrate the constructive and analytic aspects of software development. The model provides a mechanism for formalizing the characterization and planning tasks, controlling and improving projects based on quantitative analysis, learning in a deeper and more systematic way about the software process and product, and feeding the appropriate experience back into the current and future projects. The TAME system is an instantiation of the TAME software engineering process model as an ISEE (integrated software engineering environment). The first in a series of TAME system prototypes has been developed. An assessment of experience with this first limited prototype is presented including a reassessment of its initial architecture.

  11. Fidelity of test development process within a national science grant

    NASA Astrophysics Data System (ADS)

    Brumfield, Teresa E.

    In 2002, a math-science partnership (MSP) program was initiated by a national science grant. The purpose of the MSP program was to promote the development, implementation, and sustainability of promising partnerships among institutions of higher education, K-12 schools and school systems, as well as other important stakeholders. One of the funded projects included a teacher-scientist collaborative that instituted a professional development system to prepare teachers to use inquiry-based instructional modules. The MSP program mandated evaluations of its funded projects. One of the teacher-scientist collaborative project's outcomes specifically focused on teacher and student science content and process skills. In order to provide annual evidence of progress and to measure the impact of the project's efforts, and because no appropriate science tests were available to measure improvements in content knowledge of participating teachers and their students, the project contracted for the development of science tests. This dissertation focused on the process of test development within an evaluation and examined planned (i.e., expected) and actual (i.e., observed) test development, specifically concentrating on the factors that affected the actual test development process. Planned test development was defined as the process of creating tests according to the well-established test development procedures recommended by the AERA/APA/NCME 1999 Standards for Educational and Psychological Testing. Actual test development was defined as the process of creating tests as it actually took place. Because case study provides an in-depth, longitudinal examination of an event (i.e., case) in a naturalistic setting, it was selected as the appropriate methodology to examine the difference between planned and actual test development. The case (or unit of analysis) was the test development task, a task that was bounded by the context in which it occurred---and over which this researcher had no control---and by time. The purpose for studying the case was to gain a more in-depth, holistic understanding of the real-life test development task that took place within a project evaluation context. In particular, this case study investigated how the actual test development process was affected by: (1) the national and state (i.e., NC) science standards, (2) the NSF's definition of "evidence" in a project evaluation, (3) the MSP project's understanding of the role of the to-be-developed tests in their project evaluation, (4) the MSP project's understanding of the test development process, and (5) the MSP project's participants (e.g., teacher item-writers and scientists). From an investigation of this case, it was concluded that: (a) constructing psychometrically sound tests within an evaluation is not easy, (b) sufficient time and resources to construct such measures properly are seldom provided, and (c) test construction---at least within an evaluation---is not routine and unproblematic. Based upon the results from this case study, it was recommended that stakeholders (i.e., program managers, project directors, and evaluators) be familiar with the steps and standards used to develop psychometrically sound tests. Additionally, it was recommended that, for future research, a meta-analysis that examines only the test development process be conducted of all other MSP projects. A second suggested future research area was to establish a protocol that provides a systematic means by which to examine an existing or proposed MSP project for alignment with state science standards. Such a protocol would be cost-effective in that demonstrated alignment with state science standards would enable projects to use existing state science assessments, which must be in place, according to NCLB, by the 2007-2008 school year, to demonstrate student achievement. In this way, project directors and evaluators, typically with limited familiarity with the steps and standards by which psychometrically sound assessments are created, would not be placed in the role of test developer.

  12. Development and implementation of a residency project advisory board.

    PubMed

    Dagam, Julie K; Iglar, Arlene; Kindsfater, Julie; Loeb, Al; Smith, Chad; Spexarth, Frank; Brierton, Dennis; Woller, Thomas

    2017-06-15

    The development and implementation of a residency project advisory board (RPAB) to manage multiple pharmacy residents' yearlong projects across several residency programs are described. Preceptor and resident feedback during our annual residency program review and strategic planning sessions suggested the implementation of a more-coordinated approach to the identification, selection, and oversight of all components of the residency project process. A panel of 7 department leaders actively engaged in residency training and performance improvement was formed to evaluate the residency project process and provide recommendations for change. These 7 individuals would eventually constitute the RPAB. The primary objective of the RPAB at Aurora Health Care is to provide oversight and a structured framework for the selection and execution of multiple residents' yearlong projects across all residency programs within our organization. Key roles of the RPAB include developing expectations, coordinating residency project ideas, and providing oversight and feedback. The development and implementation of the RPAB resulted in a significant overhaul of our entire yearlong resident project process. Trends toward success were realized after the first year of implementation, including consistent expectations, increased clarity and engagement in resident project ideas, and more projects meeting anticipated endpoints. The development and implementation of an RPAB have provided a framework to optimize the organization, progression, and outcomes of multiple pharmacy resident yearlong projects in all residency programs across our pharmacy enterprise. Copyright © 2017 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  13. Improving Immunization Rates Using Lean Six Sigma Processes: Alliance of Independent Academic Medical Centers National Initiative III Project.

    PubMed

    Hina-Syeda, Hussaini; Kimbrough, Christina; Murdoch, William; Markova, Tsveti

    2013-01-01

    Quality improvement education and work in interdisciplinary teams is a healthcare priority. Healthcare systems are trying to meet core measures and provide excellent patient care, thus improving their Hospital Consumer Assessment of Healthcare Providers & Systems scores. Crittenton Hospital Medical Center in Rochester Hills, MI, aligned educational and clinical objectives, focusing on improving immunization rates against pneumonia and influenza prior to the rates being implemented as core measures. Improving immunization rates prevents infections, minimizes hospitalizations, and results in overall improved patient care. Teaching hospitals offer an effective way to work on clinical projects by bringing together the skill sets of residents, faculty, and hospital staff to achieve superior results. WE DESIGNED AND IMPLEMENTED A STRUCTURED CURRICULUM IN WHICH INTERDISCIPLINARY TEAMS ACQUIRED KNOWLEDGE ON QUALITY IMPROVEMENT AND TEAMWORK, WHILE FOCUSING ON A SPECIFIC CLINICAL PROJECT: improving global immunization rates. We used the Lean Six Sigma process tools to quantify the initial process capability to immunize against pneumococcus and influenza. The hospital's process to vaccinate against pneumonia overall was operating at a Z score of 3.13, and the influenza vaccination Z score was 2.53. However, the process to vaccinate high-risk patients against pneumonia operated at a Z score of 1.96. Improvement in immunization rates of high-risk patients became the focus of the project. After the implementation of solutions, the process to vaccinate high-risk patients against pneumonia operated at a Z score of 3.9 with a defects/million opportunities rate of 9,346 and a yield of 93.5%. Revisions to the adult assessment form fixed 80% of the problems identified. This process improvement project was not only beneficial in terms of improved quality of patient care but was also a positive learning experience for the interdisciplinary team, particularly for the residents. The hospital has completed quality improvement projects in the past; however, this project was the first in which residents were actively involved. The didactic components and experiential learning were powerfully synergistic. This and similar projects can have far-reaching implications in terms of promoting patient health and improving the quality of care delivered by the healthcare systems and teaching hospitals.

  14. Development of funding project risk management tools.

    DOT National Transportation Integrated Search

    2013-11-01

    Funding project risk management is a process for identifying, assessing, and prioritizing project funding risks. To plan to : minimize or eliminate the impact of negative events, one must identify what projects have higher risk to respond to potentia...

  15. "I Guess I "Do" Know a Good Story": Re-Envisioning Writing Process with Native American Students and Communities

    ERIC Educational Resources Information Center

    Stanton, Christine Rogers; Sutton, Karl

    2012-01-01

    In two projects described in this article, the authors discuss the use of Photovoice and Elder Interviews to draw upon visual and spoken forms of community-based literacy, generate ideas for written projects, promote a connection to community and culture, and engage students in critical analysis of writing process. Both projects took place in…

  16. Yield model development project implementation plan

    NASA Technical Reports Server (NTRS)

    Ambroziak, R. A.

    1982-01-01

    Tasks remaining to be completed are summarized for the following major project elements: (1) evaluation of crop yield models; (2) crop yield model research and development; (3) data acquisition processing, and storage; (4) related yield research: defining spectral and/or remote sensing data requirements; developing input for driving and testing crop growth/yield models; real time testing of wheat plant process models) and (5) project management and support.

  17. Processes and process development in Taiwan

    NASA Technical Reports Server (NTRS)

    Hwang, H. L.

    1986-01-01

    Silicon material research in the Republic of China (ROC) parallels its development in the electronic industry. A brief outline of the historical development in ROC silicon material research is given. Emphasis is placed on the recent Silane Project managed by the National Science Council, ROC, including project objectives, task forces, and recent accomplishments. An introduction is also given to industrialization of the key technologies developed in this project.

  18. Linking Effective Project Management to Business Strategy in Oil and Gas Industry through Decision-making Processes

    NASA Astrophysics Data System (ADS)

    Adeleke, Adeyinka

    The construction project in the oil and gas industry covers the entire spectrum of hydrocarbon production from the wellhead (upstream) to downstream facilities. In each of these establishments, the activities in a construction project include: consulting, studies, front-end engineering, detail engineering, procurement, program management, construction, installation, commissioning and start-up. Efficient management of each of the activities involved in construction projects is one of the driving forces for the successful completion of the project. Optimizing the crucial factors in project management during each phase of a project in an oil and gas industry can assist managers to maximize the use of available resources and drive the project to successful conclusions. One of these factors is the decision-making process in the construction project. Current research effort investigated the relationship between decision-making processes and business strategy in oil and gas industry using employee surveys. I recruited employees of different races, age group, genders, and years of experience in order understand their influence on the implementation of the decision-making process in oil and gas industry through a quantitative survey. Decision-making was assessed using five decision measures: (a) rational, (b) intuitive, (c) dependent, (d) avoidant, and (e) spontaneous. The findings indicated gender, age, years of work experience and job titles as primary variables with a negative relationship with decision-making approach for employees working in a major oil and gas industry. The study results revealed that the two most likely decision-making methods in oil and gas industry include: making a decision in a logical and systematic way and seek assistance from others when making a decision. Additionally, the two leading management approaches to decision-making in the oil and gas industry include: decision analysis is part of organization culture and management is committed to the decision-making process. Some recommendations for future studies were presented based on the need to intensify the importance of the current study and enlarge the body of knowledge regarding decision-making process in oil and gas industry.

  19. Optimizing utility owner participation in the project development and delivery process.

    DOT National Transportation Integrated Search

    2013-04-01

    Coordination with utility owners during the project development and delivery process involves multiple : activities, such as requesting and collecting data about the location and characteristics of existing facilities to : identifying and analyzing u...

  20. Implementation of advanced LCNG fueling infrastructure in Texas along the I-35/NAFTA Clean Corridor Project. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Taylor, Stan; Hightower, Jared; Knight, Koby

    This report documents the process of planning, siting, and permitting recent LCNG station projects; identifying existing constraints in these processes, and recommendations for improvements; LCNG operating history.

  1. JPL Project Information Management: A Continuum Back to the Future

    NASA Technical Reports Server (NTRS)

    Reiz, Julie M.

    2009-01-01

    This slide presentation reviews the practices and architecture that support information management at JPL. This practice has allowed concurrent use and reuse of information by primary and secondary users. The use of this practice is illustrated in the evolution of the Mars Rovers from the Mars Pathfinder to the development of the Mars Science Laboratory. The recognition of the importance of information management during all phases of a project life cycle has resulted in the design of an information system that includes metadata, has reduced the risk of information loss through the use of an in-process appraisal, shaping of project's appreciation for capturing and managing the information on one project for re-use by future projects as a natural outgrowth of the process. This process has also assisted in connection of geographically disbursed partners into a team through sharing information, common tools and collaboration.

  2. Advanced Materials in Support of EERE Needs to Advance Clean Energy Technologies Program Implementation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liby, Alan L; Rogers, Hiram

    The goal of this activity was to carry out program implementation and technical projects in support of the ARRA-funded Advanced Materials in Support of EERE Needs to Advance Clean Energy Technologies Program of the DOE Advanced Manufacturing Office (AMO) (formerly the Industrial Technologies Program (ITP)). The work was organized into eight projects in four materials areas: strategic materials, structural materials, energy storage and production materials, and advanced/field/transient processing. Strategic materials included work on titanium, magnesium and carbon fiber. Structural materials included work on alumina forming austentic (AFA) and CF8C-Plus steels. The advanced batteries and production materials projects included work onmore » advanced batteries and photovoltaic devices. Advanced/field/transient processing included work on magnetic field processing. Details of the work in the eight projects are available in the project final reports which have been previously submitted.« less

  3. The Feed Materials Program of the Manhattan Project: A Foundational Component of the Nuclear Weapons Complex

    NASA Astrophysics Data System (ADS)

    Reed, B. Cameron

    2014-12-01

    The feed materials program of the Manhattan Project was responsible for procuring uranium-bearing ores and materials and processing them into forms suitable for use as source materials for the Project's uranium-enrichment factories and plutonium-producing reactors. This aspect of the Manhattan Project has tended to be overlooked in comparison with the Project's more dramatic accomplishments, but was absolutely vital to the success of those endeavors: without appropriate raw materials and the means to process them, nuclear weapons and much of the subsequent cold war would never have come to pass. Drawing from information available in Manhattan Engineer District Documents, this paper examines the sources and processing of uranium-bearing materials used in making the first nuclear weapons and how the feed materials program became a central foundational component of the postwar nuclear weapons complex.

  4. Implementation of Building Information Modeling (BIM) in Construction: A Comparative Case Study

    NASA Astrophysics Data System (ADS)

    Rowlinson, Steve; Collins, Ronan; Tuuli, Martin M.; Jia, Yunyan

    2010-05-01

    Building Information Modeling (BIM) approach is increasingly adopted in coordination of construction projects, with a number of parties providing BIM services and software solutions. However, the empirical impact of BIM on construction industry has yet to be investigated. This paper explores the interaction between BIM and the construction industry during its implementation, with a specific focus on the empirical impacts of BIM on the design and construction processes and professional roles during the process. Two cases were selected from recent construction projects coordinated with BIM systems: the Venetian Casino project in Macau and the Cathy Pacific Cargo Terminal project in Hong Kong. The former case illustrates how the conflicts emerged during the design process and procurement were addressed by adopting a BIM approach. The latter demonstrates how the adoption of BIM altered the roles of architect, contractor, and sub-contractors involved in the project. The impacts of BIM were critically reviewed and discussed.

  5. A Strategy for Autogeneration of Space Shuttle Ground Processing Simulation Models for Project Makespan Estimations

    NASA Technical Reports Server (NTRS)

    Madden, Michael G.; Wyrick, Roberta; O'Neill, Dale E.

    2005-01-01

    Space Shuttle Processing is a complicated and highly variable project. The planning and scheduling problem, categorized as a Resource Constrained - Stochastic Project Scheduling Problem (RC-SPSP), has a great deal of variability in the Orbiter Processing Facility (OPF) process flow from one flight to the next. Simulation Modeling is a useful tool in estimation of the makespan of the overall process. However, simulation requires a model to be developed, which itself is a labor and time consuming effort. With such a dynamic process, often the model would potentially be out of synchronization with the actual process, limiting the applicability of the simulation answers in solving the actual estimation problem. Integration of TEAMS model enabling software with our existing schedule program software is the basis of our solution. This paper explains the approach used to develop an auto-generated simulation model from planning and schedule efforts and available data.

  6. Empirical studies of design software: Implications for software engineering environments

    NASA Technical Reports Server (NTRS)

    Krasner, Herb

    1988-01-01

    The empirical studies team of MCC's Design Process Group conducted three studies in 1986-87 in order to gather data on professionals designing software systems in a range of situations. The first study (the Lift Experiment) used thinking aloud protocols in a controlled laboratory setting to study the cognitive processes of individual designers. The second study (the Object Server Project) involved the observation, videotaping, and data collection of a design team of a medium-sized development project over several months in order to study team dynamics. The third study (the Field Study) involved interviews with the personnel from 19 large development projects in the MCC shareholders in order to study how the process of design is affected by organizationl and project behavior. The focus of this report will be on key observations of design process (at several levels) and their implications for the design of environments.

  7. Rigor + Results = Impact: Measuring Impact with Integrity (Invited)

    NASA Astrophysics Data System (ADS)

    Davis, H. B.; Scalice, D.

    2013-12-01

    Are you struggling to measure and explain the impact of your EPO efforts? The NASA Astrobiology Institute (NAI) is using an evaluation process to determine the impact of its 15 EPO projects with over 200 activities. What is the current impact? How can it be improved in the future? We have developed a process that preserves autonomy at the project implementation level while still painting a picture of the entire portfolio. The impact evaluation process looks at an education/public outreach activity through its entire project cycle. Working with an external evaluator, education leads: 1) rate the quality/health of an activity in each stage of its cycle, and 2) determine the impact based on the results of the evaluation and the rigor of the methods used. The process has created a way to systematically codify a project's health and its impact, while offering support for improving both impact and how it is measured.

  8. Characterization and Evaluation of Lunar Regolith and Simulants

    NASA Technical Reports Server (NTRS)

    Cross, William M.; Murphy, Gloria A.

    2010-01-01

    A NASA-ESMD (National Aeronautics and Space Administration-Exploration Systems Mission Directorate) funded senior design project "Mineral Separation Technology for Lunar Regolith Simulant Production" is directed toward designing processes to produce Simulant materials as close to lunar regolith as possible. The eight undergraduate (junior and senior) students involved are taking a systems engineering design approach to identifying the most pressing concerns in simulant needs, then designing subsystems and processing strategies to meet these needs using terrestrial materials. This allows the students to, not only learn the systems engineering design process, but also, to make a significant contribution to an important NASA ESMD project. This paper will primarily be focused on the implementation aspect, particularly related to the systems engineering process, of this NASA EMSD senior design project. In addition comparison of the NASA ESMD group experience to the implementation of systems engineering practices into a group of existing design projects is given.

  9. Advances in diffusion MRI acquisition and processing in the Human Connectome Project

    PubMed Central

    Sotiropoulos, Stamatios N; Jbabdi, Saad; Xu, Junqian; Andersson, Jesper L; Moeller, Steen; Auerbach, Edward J; Glasser, Matthew F; Hernandez, Moises; Sapiro, Guillermo; Jenkinson, Mark; Feinberg, David A; Yacoub, Essa; Lenglet, Christophe; Ven Essen, David C; Ugurbil, Kamil; Behrens, Timothy EJ

    2013-01-01

    The Human Connectome Project (HCP) is a collaborative 5-year effort to map human brain connections and their variability in healthy adults. A consortium of HCP investigators will study a population of 1200 healthy adults using multiple imaging modalities, along with extensive behavioral and genetic data. In this overview, we focus on diffusion MRI (dMRI) and the structural connectivity aspect of the project. We present recent advances in acquisition and processing that allow us to obtain very high-quality in-vivo MRI data, while enabling scanning of a very large number of subjects. These advances result from 2 years of intensive efforts in optimising many aspects of data acquisition and processing during the piloting phase of the project. The data quality and methods described here are representative of the datasets and processing pipelines that will be made freely available to the community at quarterly intervals, beginning in 2013. PMID:23702418

  10. Chapter 3: Design of the Saber-Tooth Project.

    ERIC Educational Resources Information Center

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  11. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  12. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  13. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  14. 24 CFR 58.32 - Project aggregation.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Project aggregation. 58.32 Section... Environmental Review Process: Documentation, Range of Activities, Project Aggregation and Classification § 58.32 Project aggregation. (a) A responsible entity must group together and evaluate as a single project all...

  15. Risk analysis for renewable energy projects due to constraints arising

    NASA Astrophysics Data System (ADS)

    Prostean, G.; Vasar, C.; Prostean, O.; Vartosu, A.

    2016-02-01

    Starting from the target of the European Union (EU) to use renewable energy in the area that aims a binding target of 20% renewable energy in final energy consumption by 2020, this article illustrates the identification of risks for implementation of wind energy projects in Romania, which could lead to complex technical implications, social and administrative. In specific projects analyzed in this paper were identified critical bottlenecks in the future wind power supply chain and reasonable time periods that may arise. Renewable energy technologies have to face a number of constraints that delayed scaling-up their production process, their transport process, the equipment reliability, etc. so implementing these types of projects requiring complex specialized team, the coordination of which also involve specific risks. The research team applied an analytical risk approach to identify major risks encountered within a wind farm project developed in Romania in isolated regions with different particularities, configured for different geographical areas (hill and mountain locations in Romania). Identification of major risks was based on the conceptual model set up for the entire project implementation process. Throughout this conceptual model there were identified specific constraints of such process. Integration risks were examined by an empirical study based on the method HAZOP (Hazard and Operability). The discussion describes the analysis of our results implementation context of renewable energy projects in Romania and creates a framework for assessing energy supply to any entity from renewable sources.

  16. Distributed Processing of Projections of Large Datasets: A Preliminary Study

    USGS Publications Warehouse

    Maddox, Brian G.

    2004-01-01

    Modern information needs have resulted in very large amounts of data being used in geographic information systems. Problems arise when trying to project these data in a reasonable amount of time and accuracy, however. Current single-threaded methods can suffer from two problems: fast projection with poor accuracy, or accurate projection with long processing time. A possible solution may be to combine accurate interpolation methods and distributed processing algorithms to quickly and accurately convert digital geospatial data between coordinate systems. Modern technology has made it possible to construct systems, such as Beowulf clusters, for a low cost and provide access to supercomputer-class technology. Combining these techniques may result in the ability to use large amounts of geographic data in time-critical situations.

  17. Making sense of health information technology implementation: A qualitative study protocol.

    PubMed

    Kitzmiller, Rebecca R; Anderson, Ruth A; McDaniel, Reuben R

    2010-11-29

    Implementing new practices, such as health information technology (HIT), is often difficult due to the disruption of the highly coordinated, interdependent processes (e.g., information exchange, communication, relationships) of providing care in hospitals. Thus, HIT implementation may occur slowly as staff members observe and make sense of unexpected disruptions in care. As a critical organizational function, sensemaking, defined as the social process of searching for answers and meaning which drive action, leads to unified understanding, learning, and effective problem solving -- strategies that studies have linked to successful change. Project teamwork is a change strategy increasingly used by hospitals that facilitates sensemaking by providing a formal mechanism for team members to share ideas, construct the meaning of events, and take next actions. In this longitudinal case study, we aim to examine project teams' sensemaking and action as the team prepares to implement new information technology in a tiertiary care hospital. Based on management and healthcare literature on HIT implementation and project teamwork, we chose sensemaking as an alternative to traditional models for understanding organizational change and teamwork. Our methods choices are derived from this conceptual framework. Data on project team interactions will be prospectively collected through direct observation and organizational document review. Through qualitative methods, we will identify sensemaking patterns and explore variation in sensemaking across teams. Participant demographics will be used to explore variation in sensemaking patterns. Outcomes of this research will be new knowledge about sensemaking patterns of project teams, such as: the antecedents and consequences of the ongoing, evolutionary, social process of implementing HIT; the internal and external factors that influence the project team, including team composition, team member interaction, and interaction between the project team and the larger organization; the ways in which internal and external factors influence project team processes; and the ways in which project team processes facilitate team task accomplishment. These findings will lead to new methods of implementing HIT in hospitals.

  18. Making sense of health information technology implementation: A qualitative study protocol

    PubMed Central

    2010-01-01

    Background Implementing new practices, such as health information technology (HIT), is often difficult due to the disruption of the highly coordinated, interdependent processes (e.g., information exchange, communication, relationships) of providing care in hospitals. Thus, HIT implementation may occur slowly as staff members observe and make sense of unexpected disruptions in care. As a critical organizational function, sensemaking, defined as the social process of searching for answers and meaning which drive action, leads to unified understanding, learning, and effective problem solving -- strategies that studies have linked to successful change. Project teamwork is a change strategy increasingly used by hospitals that facilitates sensemaking by providing a formal mechanism for team members to share ideas, construct the meaning of events, and take next actions. Methods In this longitudinal case study, we aim to examine project teams' sensemaking and action as the team prepares to implement new information technology in a tiertiary care hospital. Based on management and healthcare literature on HIT implementation and project teamwork, we chose sensemaking as an alternative to traditional models for understanding organizational change and teamwork. Our methods choices are derived from this conceptual framework. Data on project team interactions will be prospectively collected through direct observation and organizational document review. Through qualitative methods, we will identify sensemaking patterns and explore variation in sensemaking across teams. Participant demographics will be used to explore variation in sensemaking patterns. Discussion Outcomes of this research will be new knowledge about sensemaking patterns of project teams, such as: the antecedents and consequences of the ongoing, evolutionary, social process of implementing HIT; the internal and external factors that influence the project team, including team composition, team member interaction, and interaction between the project team and the larger organization; the ways in which internal and external factors influence project team processes; and the ways in which project team processes facilitate team task accomplishment. These findings will lead to new methods of implementing HIT in hospitals. PMID:21114860

  19. B827 Chemical Synthhesis Project - Industrial Control System Integration - Statement of Work & Specification with Attachments 1-14

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wade, F. E.

    The Chemical Synthesis Pilot Process at the Lawrence Livermore National Laboratory (LLNL) Site 300 827 Complex will be used to synthesize small quantities of material to support research and development. The project will modernize and increase current capabilities for chemical synthesis at LLNL. The primary objective of this project is the conversion of a non-automated hands-on process to a remoteoperation process, while providing enhanced batch process step control, stored recipe-specific parameter sets, process variable visibility, monitoring, alarm and warning handling, and comprehensive batch record data logging. This Statement of Work and Specification provides the industrial-grade process control requirements for themore » chemical synthesis batching control system, hereafter referred to as the “Control System” to be delivered by the System Integrator.« less

  20. [A typology for nursing processes exemplified by the "Nursing Process, Standardization and Quality in the Nursing Care Sector" Project].

    PubMed

    Güttler, Karen; Lehmann, Almut

    2003-06-01

    This paper is based on the project "nursing process, standardisation and quality in nursing care" which is funded by the BMBF. This venture aims to develop and constitute a structure for recordation and documentation of nursing processes in terms of a typology and to standardise patients data for an exchange. The typology results from both the outcomes of the actual analysis of 128 patients in hospitals, homes for the elderly and community health care centers and the research on nursing classifications. The contents of the typology has been developed in co-operation with nurses working in such institutions. The structure and transfer of the data set will be realised by an IT media based network. The range of the project is regional, national and international. In this project the Bremen Institute of Industrial Technology and Applied Work Science (BIBA-ATOP) was responsible for the project management and the development of the IT based structure of the typology. The contents of the typology have been developed by the Institute of Applied Nursing Research (iap).

  1. Distributed Wind Competitiveness Improvement Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. The Competitiveness Improvement Project (CIP) is a periodic solicitation through the U.S. Department of Energy and its National Renewable Energy Laboratory. Manufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. Thismore » fact sheet describes the CIP and funding awarded as part of the project.ufacturers of small and medium wind turbines are awarded cost-shared grants via a competitive process to optimize their designs, develop advanced manufacturing processes, and perform turbine testing. The goals of the CIP are to make wind energy cost competitive with other distributed generation technology and increase the number of wind turbine designs certified to national testing standards. This fact sheet describes the CIP and funding awarded as part of the project.« less

  2. Reengineering outcomes management: an integrated approach to managing data, systems, and processes.

    PubMed

    Neuman, K; Malloch, K; Ruetten, V

    1999-01-01

    The integration of outcomes management into organizational reengineering projects is often overlooked or marginalized in proportion to the entire project. Incorporation of an integrated outcomes management program strengthens the overall quality of reengineering projects and enhances their sustainability. This article presents a case study in which data, systems, and processes were reengineered to form an effective Outcomes Management program as a component of the organization's overall project. The authors describe eight steps to develop and monitor an integrated outcomes management program. An example of an integrated report format is included.

  3. Correlational Study of Risk Management and Information Technology Project Success

    ERIC Educational Resources Information Center

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  4. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    ERIC Educational Resources Information Center

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  5. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  6. Best Practices from WisDOT Mega and ARRA Projects

    DOT National Transportation Integrated Search

    2012-03-01

    Since 2004 WisDOT has developed a number of new techniques, methods, processes and procedures for management of two new : types of transportation projects: Mega projects and projects funded through the American Recovery and Reinvestment Act of ...

  7. Best practices from WisDOT mega and ARRA projects.

    DOT National Transportation Integrated Search

    2012-03-01

    Since 2004 WisDOT has developed a number of new techniques, methods, processes and procedures for management of two new types of transportation projects: "Mega projects" and projects funded through the American Recovery and Reinvestment Act of 2009 (...

  8. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Pilot projects. 385.12 Section... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to...

  9. 7 CFR 1980.451 - Filing and processing applications.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... categories, and their point scores, are: (A) Project will contribute to the overall economic stability of the... points). (B) Project will contribute to the overall economic stability of the project area and will...'s economy (20 points). (C) Project will contribute to the overall economic stability of the project...

  10. Consonance in Information System Projects: A Relationship Marketing Perspective

    ERIC Educational Resources Information Center

    Lin, Pei-Ying

    2010-01-01

    Different stakeholders in the information system project usually have different perceptions and expectations of the projects. There is seldom consistency in the stakeholders' evaluations of the project outcome. Thus the outcomes of information system projects are usually disappointing to one or more stakeholders. Consonance is a process that can…

  11. Measuring research progress in photovoltaics

    NASA Technical Reports Server (NTRS)

    Jackson, B.; Mcguire, P.

    1986-01-01

    The role and some results of the project analysis and integration function in the Flat-plate Solar Array (FSA) Project are presented. Activities included supporting the decision-making process, preparation of plans for project direction, setting goals for project activities, measuring progress within the project, and the development and maintenance of analytical models.

  12. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Pilot projects. 385.12 Section... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to...

  13. Methodological Ambiguities of the Projective Technique: An Overview and Attempt to Clarify.

    ERIC Educational Resources Information Center

    Veiel, H.; Coles, E. M.

    1982-01-01

    Definitions of projective tests are critiqued. A distinction is made between projective tests and projective techniques. The unique feature of the latter is its scoring process: response categories are intensionally defined and comprise infinite sets of responses. A continuity from psychometric to projective tests is argued. Statistical…

  14. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Pilot projects. 385.12 Section... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to...

  15. 24 CFR 1003.303 - Project rating.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project rating. 1003.303 Section... Application and Selection Process § 1003.303 Project rating. Each project included in an application that... problem. This factor will address the extent to which there is a need for the proposed project to address...

  16. 24 CFR 1003.303 - Project rating.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project rating. 1003.303 Section... Application and Selection Process § 1003.303 Project rating. Each project included in an application that... problem. This factor will address the extent to which there is a need for the proposed project to address...

  17. 24 CFR 1003.303 - Project rating.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project rating. 1003.303 Section... Application and Selection Process § 1003.303 Project rating. Each project included in an application that... problem. This factor will address the extent to which there is a need for the proposed project to address...

  18. 24 CFR 1003.303 - Project rating.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project rating. 1003.303 Section... Application and Selection Process § 1003.303 Project rating. Each project included in an application that... problem. This factor will address the extent to which there is a need for the proposed project to address...

  19. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Pilot projects. 385.12 Section... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to...

  20. A Process Research Framework: The International Process Research Consortium

    DTIC Science & Technology

    2006-12-01

    projects ? 52 Theme P | IPRC Framework 5 P-30 How should a process for collaborative development be formulated? The development at different companies...requires some process for the actual collaboration . How should it be handled? P-31 How do we handle change? Requirements change during development ...source projects employ a single-site development model in which there is no large community of testers but rather a single-site small group

  1. Special experimental project (SEP-14) alternate surfacing bidding.

    DOT National Transportation Integrated Search

    2008-03-01

    This report contains a discussion of the alternate bidding process used on a highway project in Kansas. : It discusses the background, bidding process, evaluation of the bids, and conclusions drawn from the : experience. It also includes a customer s...

  2. ICT and mobile health to improve clinical process delivery. a research project for therapy management process innovation.

    PubMed

    Locatelli, Paolo; Montefusco, Vittorio; Sini, Elena; Restifo, Nicola; Facchini, Roberta; Torresani, Michele

    2013-01-01

    The volume and the complexity of clinical and administrative information make Information and Communication Technologies (ICTs) essential for running and innovating healthcare. This paper tells about a project aimed to design, develop and implement a set of organizational models, acknowledged procedures and ICT tools (Mobile & Wireless solutions and Automatic Identification and Data Capture technologies) to improve actual support, safety, reliability and traceability of a specific therapy management (stem cells). The value of the project is to design a solution based on mobile and identification technology in tight collaboration with physicians and actors involved in the process to ensure usability and effectivenes in process management.

  3. The Iterative Design Process in Research and Development: A Work Experience Paper

    NASA Technical Reports Server (NTRS)

    Sullivan, George F. III

    2013-01-01

    The iterative design process is one of many strategies used in new product development. Top-down development strategies, like waterfall development, place a heavy emphasis on planning and simulation. The iterative process, on the other hand, is better suited to the management of small to medium scale projects. Over the past four months, I have worked with engineers at Johnson Space Center on a multitude of electronics projects. By describing the work I have done these last few months, analyzing the factors that have driven design decisions, and examining the testing and verification process, I will demonstrate that iterative design is the obvious choice for research and development projects.

  4. Advanced engineering environment pilot project.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schwegel, Jill; Pomplun, Alan R.; Abernathy, Rusty

    2006-10-01

    The Advanced Engineering Environment (AEE) is a concurrent engineering concept that enables real-time process tooling design and analysis, collaborative process flow development, automated document creation, and full process traceability throughout a product's life cycle. The AEE will enable NNSA's Design and Production Agencies to collaborate through a singular integrated process. Sandia National Laboratories and Parametric Technology Corporation (PTC) are working together on a prototype AEE pilot project to evaluate PTC's product collaboration tools relative to the needs of the NWC. The primary deliverable for the project is a set of validated criteria for defining a complete commercial off-the-shelf (COTS) solutionmore » to deploy the AEE across the NWC.« less

  5. Implementation of a Project Management Office (PMO)--experiences from year 1.

    PubMed

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  6. Identifying challenges in project consultants engagement practices

    NASA Astrophysics Data System (ADS)

    Shariffuddin, Nadia Alina Amir; Abidin, Nazirah Zainul

    2017-10-01

    Construction projects, green or conventional, involve multi-faceted disciplines engaged with the goal of delivering products i.e. building, infrastructure etc. at the best quality within stipulated budgets. For green projects, additional attention is added for environmental quality. Due to the various responsibilities and liabilities involved as well as the complexity of the construction process itself, formal engagement of multi-disciplinary professionals i.e. project consultants is required in any construction project. Poor selection of project consultants will lead to a multitude of complications resulting in delay, cost escalation, conflicts and poor quality. This paper explores the challenges that occur during the engagement of project consultants in a green project. As the engagement decision involves developers and architects, these two groups of respondents with green project backgrounds were approached qualitatively using interview technique. The challenges identified are limited experience and knowledge, consultants' fee vs. quality, green complexity, conflicts of interest, clients' extended expectation and less demand in green projects. The construction shifts to green project demands engagement of project consultants with added skills. It is expected that through the identification of challenges, better management and administration can be created which would give impact to the overall process of engagement in green projects.

  7. Requirements: Towards an understanding on why software projects fail

    NASA Astrophysics Data System (ADS)

    Hussain, Azham; Mkpojiogu, Emmanuel O. C.

    2016-08-01

    Requirement engineering is at the foundation of every successful software project. There are many reasons for software project failures; however, poorly engineered requirements process contributes immensely to the reason why software projects fail. Software project failure is usually costly and risky and could also be life threatening. Projects that undermine requirements engineering suffer or are likely to suffer from failures, challenges and other attending risks. The cost of project failures and overruns when estimated is very huge. Furthermore, software project failures or overruns pose a challenge in today's competitive market environment. It affects the company's image, goodwill, and revenue drive and decreases the perceived satisfaction of customers and clients. In this paper, requirements engineering was discussed. Its role in software projects success was elaborated. The place of software requirements process in relation to software project failure was explored and examined. Also, project success and failure factors were also discussed with emphasis placed on requirements factors as they play a major role in software projects' challenges, successes and failures. The paper relied on secondary data and empirical statistics to explore and examine factors responsible for the successes, challenges and failures of software projects in large, medium and small scaled software companies.

  8. Workflows and the Role of Images for Virtual 3d Reconstruction of no Longer Extant Historic Objects

    NASA Astrophysics Data System (ADS)

    Münster, S.

    2013-07-01

    3D reconstruction technologies have gained importance as tools for the research and visualization of no longer extant historic objects during the last decade. Within such reconstruction processes, visual media assumes several important roles: as the most important sources especially for a reconstruction of no longer extant objects, as a tool for communication and cooperation within the production process, as well as for a communication and visualization of results. While there are many discourses about theoretical issues of depiction as sources and as visualization outcomes of such projects, there is no systematic research about the importance of depiction during a 3D reconstruction process and based on empirical findings. Moreover, from a methodological perspective, it would be necessary to understand which role visual media plays during the production process and how it is affected by disciplinary boundaries and challenges specific to historic topics. Research includes an analysis of published work and case studies investigating reconstruction projects. This study uses methods taken from social sciences to gain a grounded view of how production processes would take place in practice and which functions and roles images would play within them. For the investigation of these topics, a content analysis of 452 conference proceedings and journal articles related to 3D reconstruction modeling in the field of humanities has been completed. Most of the projects described in those publications dealt with data acquisition and model building for existing objects. Only a small number of projects focused on structures that no longer or never existed physically. Especially that type of project seems to be interesting for a study of the importance of pictures as sources and as tools for interdisciplinary cooperation during the production process. In the course of the examination the authors of this paper applied a qualitative content analysis for a sample of 26 previously published project reports to depict strategies and types and three case studies of 3D reconstruction projects to evaluate evolutionary processes during such projects. The research showed that reconstructions of no longer existing historic structures are most commonly used for presentation or research purposes of large buildings or city models. Additionally, they are often realized by interdisciplinary workgroups using images as the most important source for reconstruction as far as important media for communication and quality control during the reconstruction process.

  9. Video Processes in Teacher Education Programs; Scope, Techniques, and Assessment. Multi-State Teacher Education Project, Monograph III.

    ERIC Educational Resources Information Center

    Bosley, Howard E.; And Others

    "Video Processes Are Changing Teacher Education" by Howard Bosley (the first of five papers comprising this document) discusses the Multi-State Teacher Education Project (M-STEP) experimentation with media; it lists various uses of video processes, concentrating specifically on microteaching and the use of simulation and critical…

  10. Current Research on Relationships between Selected Higher Order Processes and the Communication Skills and Problems of Deaf Persons.

    ERIC Educational Resources Information Center

    Metz, Dale Evan; And Others

    1980-01-01

    The paper presents four research projects in process in the Communication Sciences Laboratory at the National Technical Institute for the Deaf. These projects illustrate four broad areas of research on the relationships between higher order information processing systems and the communication skills and problems exhibited by deaf people. (Author)

  11. 78 FR 62322 - Hydropower Regulatory Efficiency Act of 2013; Notice of Rescheduled Two-Year Licensing Process...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-16

    ... at non-powered dams and closed-loop pumped storage projects in compliance with section 6 of the... process for licensing hydropower development at non-powered dams and closed-loop pumped storage projects...-powered dam versus closed- loop pumped storage) affect the steps included in a two-year process? 3.9...

  12. Using Group Projects to Teach Process Improvement in a Quality Class

    ERIC Educational Resources Information Center

    Neidigh, Robert O.

    2016-01-01

    This paper provides a description of a teaching approach that uses experiential learning to teach process improvement. The teaching approach uses student groups to perform and gather process data in a senior-level quality management class that focuses on Lean Six Sigma. A strategy to link the experiential learning in the group projects to the…

  13. Engaging Clinical Nurses in Quality Improvement Projects.

    PubMed

    Moore, Susan; Stichler, Jaynelle F

    2015-10-01

    Clinical nurses have the knowledge and expertise required to provide efficient and proficient patient care. Time and knowledge deficits can prevent nurses from developing and implementing quality improvement or evidence-based practice projects. This article reviews a process for professional development of clinical nurses that helped them to define, implement, and analyze quality improvement or evidence-based practice projects. The purpose of this project was to educate advanced clinical nurses to manage a change project from inception to completion, using the Six Sigma DMAIC (Define, Measure, Analyze, Improve, Control) Change Acceleration Process as a framework. One-to-one mentoring and didactic in-services advanced the knowledge, appreciation, and practice of advanced practice clinicians who completed multiple change projects. The projects facilitated clinical practice changes, with improved patient outcomes; a unit cultural shift, with appreciation of quality improvement and evidence-based projects; and engagement with colleagues. Project outcomes were displayed in poster presentations at a hospital exposition for knowledge dissemination. Copyright 2015, SLACK Incorporated.

  14. Post-processing of multi-hydrologic model simulations for improved streamflow projections

    NASA Astrophysics Data System (ADS)

    khajehei, sepideh; Ahmadalipour, Ali; Moradkhani, Hamid

    2016-04-01

    Hydrologic model outputs are prone to bias and uncertainty due to knowledge deficiency in model and data. Uncertainty in hydroclimatic projections arises due to uncertainty in hydrologic model as well as the epistemic or aleatory uncertainties in GCM parameterization and development. This study is conducted to: 1) evaluate the recently developed multi-variate post-processing method for historical simulations and 2) assess the effect of post-processing on uncertainty and reliability of future streamflow projections in both high-flow and low-flow conditions. The first objective is performed for historical period of 1970-1999. Future streamflow projections are generated for 10 statistically downscaled GCMs from two widely used downscaling methods: Bias Corrected Statistically Downscaled (BCSD) and Multivariate Adaptive Constructed Analogs (MACA), over the period of 2010-2099 for two representative concentration pathways of RCP4.5 and RCP8.5. Three semi-distributed hydrologic models were employed and calibrated at 1/16 degree latitude-longitude resolution for over 100 points across the Columbia River Basin (CRB) in the pacific northwest USA. Streamflow outputs are post-processed through a Bayesian framework based on copula functions. The post-processing approach is relying on a transfer function developed based on bivariate joint distribution between the observation and simulation in historical period. Results show that application of post-processing technique leads to considerably higher accuracy in historical simulations and also reducing model uncertainty in future streamflow projections.

  15. The importance of ray pathlengths when measuring objects in maximum intensity projection images.

    PubMed

    Schreiner, S; Dawant, B M; Paschal, C B; Galloway, R L

    1996-01-01

    It is important to understand any process that affects medical data. Once the data have changed from the original form, one must consider the possibility that the information contained in the data has also changed. In general, false negative and false positive diagnoses caused by this post-processing must be minimized. Medical imaging is one area in which post-processing is commonly performed, but there is often little or no discussion of how these algorithms affect the data. This study uncovers some interesting properties of maximum intensity projection (MIP) algorithms which are commonly used in the post-processing of magnetic resonance (MR) and computed tomography (CT) angiographic data. The appearance of the width of vessels and the extent of malformations such as aneurysms is of interest to clinicians. This study will show how MIP algorithms interact with the shape of the object being projected. MIP's can make objects appear thinner in the projection than in the original data set and also alter the shape of the profile of the object seen in the original data. These effects have consequences for width-measuring algorithms which will be discussed. Each projected intensity is dependent upon the pathlength of the ray from which the projected pixel arises. The morphology (shape and intensity profile) of an object will change the pathlength that each ray experiences. This is termed the pathlength effect. In order to demonstrate the pathlength effect, simple computer models of an imaged vessel were created. Additionally, a static MR phantom verified that the derived equation for the projection-plane probability density function (pdf) predicts the projection-plane intensities well (R(2)=0.96). Finally, examples of projections through in vivo MR angiography and CT angiography data are presented.

  16. Image Processing and Computer Aided Diagnosis in Computed Tomography of the Breast

    DTIC Science & Technology

    2007-03-01

    TERMS breast imaging, breast CT, scatter compensation, denoising, CAD , Cone-beam CT 16. SECURITY CLASSIFICATION OF: 17. LIMITATION OF...clinical projection images. The CAD tool based on signal known exactly (SKE) scenario is under development. Task 6: Test and compare the...performances of the CAD developed in Task 5 applied to processed projection data from Task 1 with the CAD performance on the projection data without Bayesian

  17. Being in the World: An Existential Inquiry of Knowing One's Self through a Personal Project--In the Context of Dissertation Survival

    ERIC Educational Resources Information Center

    Kitajima, Tomoe

    2012-01-01

    This study--a philosophical exploration, partly in an autoethnographical account-provides an empirical demonstration that one's personal project has a strong and positive impact on the dissertation process both for endurance to complete the process and for quality of the product. The concept of project is often explained as one's pursuit…

  18. Integrated Modeling and Analysis of Physical Oceanographic and Acoustic Processes

    DTIC Science & Technology

    2015-09-30

    goal is to improve ocean physical state and acoustic state predictive capabilities. The goal fitting the scope of this project is the creation of... Project -scale objectives are to complete targeted studies of oceanographic processes in a few regimes, accompanied by studies of acoustic propagation...by the basic research efforts of this project . An additional objective is to develop improved computational tools for acoustics and for the

  19. Improving Initiation and Tracking of Research Projects at an Academic Health Center: A Case Study.

    PubMed

    Schmidt, Susanne; Goros, Martin; Parsons, Helen M; Saygin, Can; Wan, Hung-Da; Shireman, Paula K; Gelfond, Jonathan A L

    2017-09-01

    Research service cores at academic health centers are important in driving translational advancements. Specifically, biostatistics and research design units provide services and training in data analytics, biostatistics, and study design. However, the increasing demand and complexity of assigning appropriate personnel to time-sensitive projects strains existing resources, potentially decreasing productivity and increasing costs. Improving processes for project initiation, assigning appropriate personnel, and tracking time-sensitive projects can eliminate bottlenecks and utilize resources more efficiently. In this case study, we describe our application of lean six sigma principles to our biostatistics unit to establish a systematic continual process improvement cycle for intake, allocation, and tracking of research design and data analysis projects. The define, measure, analyze, improve, and control methodology was used to guide the process improvement. Our goal was to assess and improve the efficiency and effectiveness of operations by objectively measuring outcomes, automating processes, and reducing bottlenecks. As a result, we developed a web-based dashboard application to capture, track, categorize, streamline, and automate project flow. Our workflow system resulted in improved transparency, efficiency, and workload allocation. Using the dashboard application, we reduced the average study intake time from 18 to 6 days, a 66.7% reduction over 12 months (January to December 2015).

  20. Relationship between time management in construction industry and project management performance

    NASA Astrophysics Data System (ADS)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  1. Automated Procurement System (APS): Project management plan (DS-03), version 1.2

    NASA Technical Reports Server (NTRS)

    Murphy, Diane R.

    1994-01-01

    The National Aeronautics and Space Administration (NASA) Marshall Space Flight Center (MSFC) is implementing an Automated Procurement System (APS) to streamline its business activities that are used to procure goods and services. This Project Management Plan (PMP) is the governing document throughout the implementation process and is identified as the APS Project Management Plan (DS-03). At this point in time, the project plan includes the schedules and tasks necessary to proceed through implementation. Since the basis of APS is an existing COTS system, the implementation process is revised from the standard SDLC. The purpose of the PMP is to provide the framework for the implementation process. It discusses the roles and responsibilities of the NASA project staff, the functions to be performed by the APS Development Contractor (PAI), and the support required of the NASA computer support contractor (CSC). To be successful, these three organizations must work together as a team, working towards the goals established in this Project Plan. The Project Plan includes a description of the proposed system, describes the work to be done, establishes a schedule of deliverables, and discusses the major standards and procedures to be followed.

  2. DECOVALEX Project: from 1992 to 2007

    NASA Astrophysics Data System (ADS)

    Tsang, Chin-Fu; Stephansson, Ove; Jing, Lanru; Kautsky, Fritz

    2009-05-01

    The DECOVALEX project is a unique international research collaboration, initiated in 1992, for advancing the understanding and mathematical modelling of coupled thermo-hydro-mechanical (THM) and thermo-hydro-mechanical-chemical (THMC) processes in geological systems—subjects of importance for performance assessment of radioactive waste repositories in geological formations. From 1992 up to 2007, the project has made important progress and played a key role in the development of numerical modelling of coupled processes in fractured rocks and buffer/backfill materials. The project has been conducted by research teams supported by a large number of radioactive-waste-management organizations and regulatory authorities, including those of Canada, China, Finland, France, Japan, Germany, Spain, Sweden, UK, and the USA. Through this project, in-depth knowledge has been gained of coupled THM and THMC processes associated with nuclear waste repositories, as well as numerical simulation models for their quantitative analysis. The knowledge accumulated from this project, in the form of a large number of research reports and international journal and conference papers in the open literature, has been applied effectively in the implementation and review of national radioactive-waste-management programmes in the participating countries. This paper presents an overview of the project.

  3. Evidence for an elastic projection mechanism in the chameleon tongue.

    PubMed Central

    de Groot, Jurriaan H.; van Leeuwen, Johan L.

    2004-01-01

    To capture prey, chameleons ballistically project their tongues as far as 1.5 body lengths with accelerations of up to 500 m s(-2). At the core of a chameleon's tongue is a cylindrical tongue skeleton surrounded by the accelerator muscle. Previously, the cylindrical accelerator muscle was assumed to power tongue projection directly during the actual fast projection of the tongue. However, high-speed recordings of Chamaeleo melleri and C. pardalis reveal that peak powers of 3000 W kg(-1) are necessary to generate the observed accelerations, which exceed the accelerator muscle's capacity by at least five- to 10-fold. Extrinsic structures might power projection via the tongue skeleton. High-speed fluoroscopy suggests that they contribute less than 10% of the required peak instantaneous power. Thus, the projection power must be generated predominantly within the tongue, and an energy-storage-and-release mechanism must be at work. The key structure in the projection mechanism is probably a cylindrical connective-tissue layer, which surrounds the entoglossal process and was previously suggested to act as lubricating tissue. This tissue layer comprises at least 10 sheaths that envelop the entoglossal process. The outer portion connects anteriorly to the accelerator muscle and the inner portion to the retractor structures. The sheaths contain helical arrays of collagen fibres. Prior to projection, the sheaths are longitudinally loaded by the combined radial contraction and hydrostatic lengthening of the accelerator muscle, at an estimated mean power of 144 W kg(-1) in C. melleri. Tongue projection is triggered as the accelerator muscle and the loaded portions of the sheaths start to slide over the tip of the entoglossal process. The springs relax radially while pushing off the rounded tip of the entoglossal process, making the elastic energy stored in the helical fibres available for a simultaneous forward acceleration of the tongue pad, accelerator muscle and retractor structures. The energy release continues as the multilayered spring slides over the tip of the smooth and lubricated entoglossal process. This sliding-spring theory predicts that the sheaths deliver most of the instantaneous power required for tongue projection. The release power of the sliding tubular springs exceeds the work rate of the accelerator muscle by at least a factor of 10 because the elastic-energy release occurs much faster than the loading process. Thus, we have identified a unique catapult mechanism that is very different from standard engineering designs. Our morphological and kinematic observations, as well as the available literature data, are consistent with the proposed mechanism of tongue projection, although experimental tests of the sheath strain and the lubrication of the entoglossal process are currently beyond our technical scope. PMID:15209111

  4. Evidence for an elastic projection mechanism in the chameleon tongue.

    PubMed

    de Groot, Jurriaan H; van Leeuwen, Johan L

    2004-04-07

    To capture prey, chameleons ballistically project their tongues as far as 1.5 body lengths with accelerations of up to 500 m s(-2). At the core of a chameleon's tongue is a cylindrical tongue skeleton surrounded by the accelerator muscle. Previously, the cylindrical accelerator muscle was assumed to power tongue projection directly during the actual fast projection of the tongue. However, high-speed recordings of Chamaeleo melleri and C. pardalis reveal that peak powers of 3000 W kg(-1) are necessary to generate the observed accelerations, which exceed the accelerator muscle's capacity by at least five- to 10-fold. Extrinsic structures might power projection via the tongue skeleton. High-speed fluoroscopy suggests that they contribute less than 10% of the required peak instantaneous power. Thus, the projection power must be generated predominantly within the tongue, and an energy-storage-and-release mechanism must be at work. The key structure in the projection mechanism is probably a cylindrical connective-tissue layer, which surrounds the entoglossal process and was previously suggested to act as lubricating tissue. This tissue layer comprises at least 10 sheaths that envelop the entoglossal process. The outer portion connects anteriorly to the accelerator muscle and the inner portion to the retractor structures. The sheaths contain helical arrays of collagen fibres. Prior to projection, the sheaths are longitudinally loaded by the combined radial contraction and hydrostatic lengthening of the accelerator muscle, at an estimated mean power of 144 W kg(-1) in C. melleri. Tongue projection is triggered as the accelerator muscle and the loaded portions of the sheaths start to slide over the tip of the entoglossal process. The springs relax radially while pushing off the rounded tip of the entoglossal process, making the elastic energy stored in the helical fibres available for a simultaneous forward acceleration of the tongue pad, accelerator muscle and retractor structures. The energy release continues as the multilayered spring slides over the tip of the smooth and lubricated entoglossal process. This sliding-spring theory predicts that the sheaths deliver most of the instantaneous power required for tongue projection. The release power of the sliding tubular springs exceeds the work rate of the accelerator muscle by at least a factor of 10 because the elastic-energy release occurs much faster than the loading process. Thus, we have identified a unique catapult mechanism that is very different from standard engineering designs. Our morphological and kinematic observations, as well as the available literature data, are consistent with the proposed mechanism of tongue projection, although experimental tests of the sheath strain and the lubrication of the entoglossal process are currently beyond our technical scope.

  5. SELENIUM TREATMENT/REMOVAL ALTERNATIVES DEMONSTRATION PROJECT - MINE WASTE TECHNOLOGY PROGRAM ACTIVITY III, PROJECT 20

    EPA Science Inventory

    This document is the final report for EPA's Mine WAste Technology Program (MWTP) Activity III, Project 20--Selenium Treatment/Removal Alternatives Demonstration project. Selenium contamination originates from many sources including mining operations, mineral processing, abandoned...

  6. Linking user and staff perspectives in the evaluation of innovative transition projects for youth with disabilities.

    PubMed

    McAnaney, Donal F; Wynne, Richard F

    2016-06-01

    A key challenge in formative evaluation is to gather appropriate evidence to inform the continuous improvement of initiatives. In the absence of outcome data, the programme evaluator often must rely on the perceptions of beneficiaries and staff in generating insight into what is making a difference. The article describes the approach adopted in an evaluation of 15 innovative projects supporting school-leavers with disabilities in making the transition to education, work and life in community settings. Two complementary processes provided an insight into what project staff and leadership viewed as the key project activities and features that facilitated successful transition as well as the areas of quality of life (QOL) that participants perceived as having been impacted positively by the projects. A comparison was made between participants' perceptions of QOL impact with the views of participants in services normally offered by the wider system. This revealed that project participants were significantly more positive in their views than participants in traditional services. In addition, the processes and activities of the more highly rated projects were benchmarked against less highly rated projects and also with usually available services. Even in the context of a range of intervening variables such as level and complexity of participant needs and variations in the stage of development of individual projects, the benchmarking process indicated a number of project characteristics that were highly valued by participants. © The Author(s) 2016.

  7. SEL's Software Process-Improvement Program

    NASA Technical Reports Server (NTRS)

    Basili, Victor; Zelkowitz, Marvin; McGarry, Frank; Page, Jerry; Waligora, Sharon; Pajerski, Rose

    1995-01-01

    The goals and operations of the Software Engineering Laboratory (SEL) is reviewed. For nearly 20 years the SEL has worked to understand, assess, and improve software and the development process within the production environment of the Flight Dynamics Division (FDD) of NASA's Goddard Space Flight Center. The SEL was established in 1976 with the goals of reducing: (1) the defect rate of delivered software, (2) the cost of software to support flight projects, and (3) the average time to produce mission-support software. After studying over 125 projects of FDD, the results have guided the standards, management practices, technologies, and the training within the division. The results of the studies have been a 75 percent reduction in defects, a 50 percent reduction in cost, and a 25 percent reduction in development time. Over time the goals of SEL have been clarified. The goals are now stated as: (1) Understand baseline processes and product characteristics, (2) Assess improvements that have been incorporated into the development projects, (3) Package and infuse improvements into the standard SEL process. The SEL improvement goal is to demonstrate continual improvement of the software process by carrying out analysis, measurement and feedback to projects with in the FDD environment. The SEL supports the understanding of the process by study of several processes including, the effort distribution, and error detection rates. The SEL assesses and refines the processes. Once the assessment and refinement of a process is completed, the SEL packages the process by capturing the process in standards, tools and training.

  8. NHDOT : process for municipally managed state aid highway program projects

    DOT National Transportation Integrated Search

    2006-05-23

    The design and construction of Municipally Managed State Aid Highway Program projects must comply with the requirements in this guideline in order to receive State Aid under the applicable provisions of RSA 235. Under this process, State Aid Construc...

  9. Vehicle Infrastructure Integration (VII) data use analysis and processing : project summary report.

    DOT National Transportation Integrated Search

    2012-03-01

    The purpose of the Data Use Analysis and Processing (DUAP) project is to support the : Michigan Department of Transportation (MDOT) and its partners in evaluating uses and : benefits of connected vehicle data in transportation agency management and :...

  10. The NASA SARP Software Research Infusion Initiative

    NASA Technical Reports Server (NTRS)

    Hinchey, Mike; Pressburger, Tom; Markosian, Lawrence; Feather, Martin

    2006-01-01

    A viewgraph presentation describing the NASA Software Assurance Research Program (SARP) research infusion projects is shown. The topics include: 1) Background/Motivation; 2) Proposal Solicitation Process; 3) Proposal Evaluation Process; 4) Overview of Some Projects to Date; and 5) Lessons Learned.

  11. Integrating Safety and Mission Assurance in Design

    NASA Technical Reports Server (NTRS)

    Cianciola, Chris; Crane, Kenneth

    2008-01-01

    This presentation describes how the Ares Projects are learning from the successes and failures of previous launch systems in order to maximize safety and reliability while maintaining fiscal responsibility. The Ares Projects are integrating Safety and Mission Assurance into design activities and embracing independent assessments by Quality experts in thorough reviews of designs and processes. Incorporating Lean thinking into the design process, Ares is also streamlining existing processes and future manufacturing flows which will yield savings during production. Understanding the value of early involvement of Quality experts, the Ares Projects are leading launch vehicle development into the 21st century.

  12. DECOVALEX-THMC Task D: Long-Term Permeability/Porosity Changes inthe EDZ and Near Field due to THM and THC Processes in Volcanic andCrystaline-Bentonite Systems, Status Report October 2005

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Birkholzer, J.; Rutqvist, J.; Sonnenthal, E.

    The DECOVALEX project is an international cooperativeproject initiated by SKI, the Swedish Nuclear Power Inspectorate, withparticipation of about 10 international organizations. The name DECOVALEXstands for DEvelopment of COupled models and their VALidation againstExperiments. The general goal of this project is to encouragemultidisciplinary interactive and cooperative research on modelingcoupled processes in geologic formations in support of the performanceassessment for underground storage of radioactive waste. Three multi-yearproject stages of DECOVALEX have been completed in the past decade,mainly focusing on coupled thermal-hydrological-mechanicalprocesses.Currently, a fourth three-year project stage of DECOVALEX isunder way, referred to as DECOVALEX-THMC. THMC stands for Thermal,Hydrological, Mechanical, and Chemical processes.more » The new project stageaims at expanding the traditional geomechanical scope of the previousDECOVALEX project stages by incorporating geochemical processes importantfor repository performance. The U.S. Department of Energy (DOE) leadsTask D of the new DECOVALEX phase, entitled "Long-termPermeability/Porosity Changes in the EDZ and Near Field due to THC andTHM Processes for Volcanic and Crystalline-Bentonite Systems." In itsleadership role for Task D, DOE coordinates and sets the direction forthe cooperative research activities of the international research teamsengaged in Task D.« less

  13. Integrating Theory and Practice: Applying the Quality Improvement Paradigm to Product Line Engineering

    NASA Technical Reports Server (NTRS)

    Stark, Michael; Hennessy, Joseph F. (Technical Monitor)

    2002-01-01

    My assertion is that not only are product lines a relevant research topic, but that the tools used by empirical software engineering researchers can address observed practical problems. Our experience at NASA has been there are often externally proposed solutions available, but that we have had difficulties applying them in our particular context. We have also focused on return on investment issues when evaluating product lines, and while these are important, one can not attain objective data on success or failure until several applications from a product family have been deployed. The use of the Quality Improvement Paradigm (QIP) can address these issues: (1) Planning an adoption path from an organization's current state to a product line approach; (2) Constructing a development process to fit the organization's adoption path; (3) Evaluation of product line development processes as the project is being developed. The QIP consists of the following six steps: (1) Characterize the project and its environment; (2) Set quantifiable goals for successful project performance; (3) Choose the appropriate process models, supporting methods, and tools for the project; (4) Execute the process, analyze interim results, and provide real-time feedback for corrective action; (5) Analyze the results of completed projects and recommend improvements; and (6) Package the lessons learned as updated and refined process models. A figure shows the QIP in detail. The iterative nature of the QIP supports an incremental development approach to product lines, and the project learning and feedback provide the necessary early evaluations.

  14. Project management techniques for highly integrated programs

    NASA Technical Reports Server (NTRS)

    Stewart, J. F.; Bauer, C. A.

    1983-01-01

    The management and control of a representative, highly integrated high-technology project, in the X-29A aircraft flight test project is addressed. The X-29A research aircraft required the development and integration of eight distinct technologies in one aircraft. The project management system developed for the X-29A flight test program focuses on the dynamic interactions and the the intercommunication among components of the system. The insights gained from the new conceptual framework permitted subordination of departments to more functional units of decisionmaking, information processing, and communication networks. These processes were used to develop a project management system for the X-29A around the information flows that minimized the effects inherent in sampled-data systems and exploited the closed-loop multivariable nature of highly integrated projects.

  15. BIM integration in education: A case study of the construction technology project Bolt Tower Dolni Vitkovice

    NASA Astrophysics Data System (ADS)

    Venkrbec, Vaclav; Bittnerova, Lucie

    2017-12-01

    Building information modeling (BIM) can support effectiveness during many activities in the AEC industry. even when processing a construction-technological project. This paper presents an approach how to use building information model in higher education, especially during the work on diploma thesis and it supervision. Diploma thesis is project based work, which aims to compile a construction-technological project for a selected construction. The paper describes the use of input data, working with them and compares this process with standard input data such as printed design documentation. The effectiveness of using the building information model as a input data for construction-technological project is described in the conclusion.

  16. Continuous Risk Management

    NASA Technical Reports Server (NTRS)

    Sabelhaus, Phil

    2002-01-01

    Risk identification is an ongoing activity that takes place during the routine project work flow. Project activities such as programmatic and technical meetings, telecons, reviews, and other forms of communication often bring to light project risks. When this occurs, we record and analyze the risk on a Risk Information Sheet. This process helps the project team identify and cope with project risks throughout the life of the project.

  17. Apollo-Soyuz test project photographic film processing and sensitometric summary

    NASA Technical Reports Server (NTRS)

    Lockwood, H. E.

    1975-01-01

    The Photographic Technology Division at the NASA Lyndon B. Johnson Space Center processed original photographic films exposed in flight during the Apollo Soyuz Test Project (ASTP). Integrated with processing of the original films were strict sensitometric controls and certification procedures established prior to the flight. Information relative to the processing of the 54 rolls of original ASTP flight film and sensitometric data pertinent to each of these rolls of film is presented.

  18. Integrating a Project Management Approach to E-Business Application Course

    ERIC Educational Resources Information Center

    Chen, Kuan C.; Chuang, Keh-Wen

    2008-01-01

    Teaching students project managements requires a hands-on approach. Incorporating project management concepts and processes into a student team Web development project adds a dimension that exposes students to the realities of effective Web development. This paper will describe the project management approach used in a Web development course in…

  19. The Project Method in Agricultural Education: Then and Now

    ERIC Educational Resources Information Center

    Roberts, T. Grady; Harlin, Julie F.

    2007-01-01

    The purpose of this philosophical paper was to synthesize theoretical and historical foundations of the project method and compare them to modern best-practices. A review of historical and contemporary literature related to the project method yielded six themes: 1) purpose of projects; 2) project classification; 3) the process; 4) the context; 5)…

  20. Benchmarking facilities providing care: An international overview of initiatives

    PubMed Central

    Thonon, Frédérique; Watson, Jonathan; Saghatchian, Mahasti

    2015-01-01

    We performed a literature review of existing benchmarking projects of health facilities to explore (1) the rationales for those projects, (2) the motivation for health facilities to participate, (3) the indicators used and (4) the success and threat factors linked to those projects. We studied both peer-reviewed and grey literature. We examined 23 benchmarking projects of different medical specialities. The majority of projects used a mix of structure, process and outcome indicators. For some projects, participants had a direct or indirect financial incentive to participate (such as reimbursement by Medicaid/Medicare or litigation costs related to quality of care). A positive impact was reported for most projects, mainly in terms of improvement of practice and adoption of guidelines and, to a lesser extent, improvement in communication. Only 1 project reported positive impact in terms of clinical outcomes. Success factors and threats are linked to both the benchmarking process (such as organisation of meetings, link with existing projects) and indicators used (such as adjustment for diagnostic-related groups). The results of this review will help coordinators of a benchmarking project to set it up successfully. PMID:26770800

  1. NCAR Earth Observing Laboratory's Data Tracking System

    NASA Astrophysics Data System (ADS)

    Cully, L. E.; Williams, S. F.

    2014-12-01

    The NCAR Earth Observing Laboratory (EOL) maintains an extensive collection of complex, multi-disciplinary datasets from national and international, current and historical projects accessible through field project web pages (https://www.eol.ucar.edu/all-field-projects-and-deployments). Data orders are processed through the EOL Metadata Database and Cyberinfrastructure (EMDAC) system. Behind the scenes is the institutionally created EOL Computing, Data, and Software/Data Management Group (CDS/DMG) Data Tracking System (DTS) tool. The DTS is used to track the complete life cycle (from ingest to long term stewardship) of the data, metadata, and provenance for hundreds of projects and thousands of data sets. The DTS is an EOL internal only tool which consists of three subsystems: Data Loading Notes (DLN), Processing Inventory Tool (IVEN), and Project Metrics (STATS). The DLN is used to track and maintain every dataset that comes to the CDS/DMG. The DLN captures general information such as title, physical locations, responsible parties, high level issues, and correspondence. When the CDS/DMG processes a data set, IVEN is used to track the processing status while collecting sufficient information to ensure reproducibility. This includes detailed "How To" documentation, processing software (with direct links to the EOL Subversion software repository), and descriptions of issues and resolutions. The STATS subsystem generates current project metrics such as archive size, data set order counts, "Top 10" most ordered data sets, and general information on who has ordered these data. The DTS was developed over many years to meet the specific needs of the CDS/DMG, and it has been successfully used to coordinate field project data management efforts for the past 15 years. This paper will describe the EOL CDS/DMG Data Tracking System including its basic functionality, the provenance maintained within the system, lessons learned, potential improvements, and future developments.

  2. NASA Construction of Facilities Validation Processes - Total Building Commissioning (TBCx)

    NASA Technical Reports Server (NTRS)

    Hoover, Jay C.

    2004-01-01

    Key Atributes include: Total Quality Management (TQM) System that looks at all phases of a project. A team process that spans boundaries. A Commissioning Authority to lead the process. Commissioning requirements in contracts. Independent design review to verify compliance with Facility Project Requirements (FPR). Formal written Commissioning Plan with Documented Results. Functional performance testing (FPT) against the requirements document.

  3. PSP, TSP, XP, CMMI...Eating the Alphabet Soup!

    DTIC Science & Technology

    2011-05-19

    Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that notwithstanding any other...4 Q tit t Continuous process improvement Organizational Performance Management Causal Analysis and Resolution Level Focus Process Areas Requirements...Project Management process standardization Risk management Decision Analysis and Resolution Product Integration 2 M d R i t t anage Basic Project

  4. Project T.E.A.M. (Technical Education Advancement Modules). Introduction to Statistical Process Control.

    ERIC Educational Resources Information Center

    Billings, Paul H.

    This instructional guide, one of a series developed by the Technical Education Advancement Modules (TEAM) project, is a 6-hour introductory module on statistical process control (SPC), designed to develop competencies in the following skill areas: (1) identification of the three classes of SPC use; (2) understanding a process and how it works; (3)…

  5. Planning and leading of the technological processes by mechanical working with microsoft project

    NASA Astrophysics Data System (ADS)

    Nae, I.; Grigore, N.

    2016-08-01

    Nowadays, fabrication systems and methods are being modified; new processing technologies come up, flow sheets develop a minimum number of phases, the flexibility of the technologies grows up, new methods and instruments of monitoring and leading the processing operations also come up. The technological course (route, entry, scheme, guiding) referring to the series of the operation, putting and execution phases of a mark in order to obtain the final product from the blank is represented by a sequence of activities realized by a logic manner, on a well determined schedule, with a determined budget and resources. Also, a project can be defined as a series of specific activities, methodical structured which they aim to finish a specific objective, within a fixed schedule and budget. Within the homogeneity between the project and the technological course, this research is presenting the defining of the technological course of mechanical chip removing process using Microsoft Project. Under these circumstances, this research highlights the advantages of this method: the celerity using of other technological alternatives in order to pick the optimal process, the job scheduling being constrained by any kinds, the standardization of some processing technological operations.

  6. Performance excellence: using Lean Six Sigma tools to improve the US Army behavioral health surveillance process, boost team morale, and maximize value to customers and stakeholders.

    PubMed

    Watkins, Eren Youmans; Kemeter, Dave M; Spiess, Anita; Corrigan, Elizabeth; Kateley, Keri; Wills, John V; Mancha, Brent Edward; Nichols, Jerrica; Bell, Amy Millikan

    2014-01-01

    Lean Six Sigma (LSS) is a process improvement, problem-solving methodology used in business and manufacturing to improve the speed, quality, and cost of products. LSS can also be used to improve knowledge-based products integral to public health surveillance. An LSS project by the Behavioral Social Health Outcomes Program of the Army Institute of Public Health reduced the number of labor hours spent producing the routine surveillance of suicidal behavior publication. At baseline, the total number of labor hours was 448; after project completion, total labor hours were 199. Based on customer feedback, publication production was reduced from quarterly to annually. Process improvements enhanced group morale and established best practices in the form of standard operating procedures and business rules to ensure solutions are sustained. LSS project participation also fostered a change in the conceptualization of tasks and projects. These results demonstrate that LSS can be used to inform the public health process and should be considered a viable method of improving knowledge-based products and processes.

  7. 23 CFR 924.9 - Planning.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... evaluation process to analyze and assess results achieved by the HSIP and uses this information, where... program of projects, technologies, or strategies to reduce or eliminate highway safety hazards; (G) Adopts... elements to develop highway safety improvement projects. (5) A process for establishing priorities for...

  8. 23 CFR 924.9 - Planning.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... evaluation process to analyze and assess results achieved by the HSIP and uses this information, where... program of projects, technologies, or strategies to reduce or eliminate highway safety hazards; (G) Adopts... elements to develop highway safety improvement projects. (5) A process for establishing priorities for...

  9. 23 CFR 924.9 - Planning.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... evaluation process to analyze and assess results achieved by the HSIP and uses this information, where... program of projects, technologies, or strategies to reduce or eliminate highway safety hazards; (G) Adopts... elements to develop highway safety improvement projects. (5) A process for establishing priorities for...

  10. Development of a process for quantifying the benefits of research : final report.

    DOT National Transportation Integrated Search

    2017-07-04

    MnDOT Research Services funds and administers approximately 180 transportation research projects annually at a cost of slightly more than $3 million. This project developed an easy-to-apply process for quantifying the potential benefits of research a...

  11. TRIHALOMETHANE PRECURSOR REMOVAL BY THE MAGNESIUM CARBONATE PROCESS

    EPA Science Inventory

    A project was conducted to determine and improve the ability of the magnesium carbonate process to remove trihalomethane (THM) precursors in treated drinking water. The project was conducted at a drinking water treatment plant in Melbourne, FL, which had been developed and instal...

  12. Managing the construction bidding process : a move to simpler construction plan sets

    DOT National Transportation Integrated Search

    2001-01-31

    This project was conducted to determine whether construction plan sets could be significantly simplified to speed the process of moving projects to construction. The work steps included a literature review, a telephone survey of highway agencies in s...

  13. A review of the Virginia Department of Transportation's scoping process and options for potential improvements.

    DOT National Transportation Integrated Search

    2008-01-01

    Transportation project scoping is a process where the project's purpose and need, budget, schedule, and scope are developed. Interviews conducted with 27 staff representing VDOT, FHWA, and regional planners, coupled with a review of related literatur...

  14. DESIGN OF A TRAP GREASE UPGRADER FOR BIOFUEL PROCESSING - PHASE I

    EPA Science Inventory

    This project provides capstone senior design experience to several teams of engineering undergraduates at Drexel University through the technical and economic evaluation of a trap grease to biodiesel conversion process. The project incorporates two phases: Phase I characteri...

  15. 75 FR 22838 - Notice of Availability of the Draft Environmental Impact Statement for the Genesis Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-30

    ... necessary haul roads and access roads, and process 60 million tons of gold-bearing ore. The proposed project... of mercury associated with processing the 60 million tons of ore; (3) The impacts of 12 additional...

  16. Transportation infrastructure : review of project selection process for five FHWA discretionary programs

    DOT National Transportation Integrated Search

    1997-11-01

    DOT uses a two-phase process for selecting and funding transportation : projects for the five discretionary programs we reviewed. In the first : phase, FHWA program staff in the field and headquarters compile and : evaluate the applications that stat...

  17. 77 FR 47337 - Project-Level Predecisional Administrative Review Process

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-08

    ... upholding environmental standards and encouraging early public input during planning processes. One of the... when they are categorically excluded from analysis under the National Environmental Policy Act (NEPA... applicable to projects and activities evaluated in an environmental analysis (EA) or environmental impact...

  18. Sensitometric crossover for 2485 in balloon observation astronomical program

    NASA Technical Reports Server (NTRS)

    Perry, L.

    1973-01-01

    Photographic film processing support is described for the CREPE 4 project, a high-altitude balloon study of cosmic radiation. The processing procedures are summarized, and recommendations are made for the size and thickness of film to be used in future projects.

  19. Remote terminal system evaluation

    NASA Technical Reports Server (NTRS)

    Phillips, T. L.; Grams, H. L.; Lindenlaub, J. C.; Schwingendorf, S. K.; Swain, P. H.; Simmons, W. R.

    1975-01-01

    An Earth Resources Data Processing System was developed to evaluate the system for training, technology transfer, and data processing. In addition to the five sites included in this project two other sites were connected to the system under separate agreements. The experience of these two sites is discussed. The results of the remote terminal project are documented in seven reports: one from each of the five project sites, Purdue University, and an overview report summarizing the other six reports.

  20. Surgery and Research: A Practical Approach to Managing the Research Process

    PubMed Central

    Swiatek, Peter R.; Chung, Kevin C.; Mahmoudi, Elham

    2016-01-01

    Following a practical project management method is essential in completing a research project on time and within budget. Although this concept is well developed in the business world, it has yet to be explored in academic surgical research. Defining and adhering to a suitable workflow would increase portability, reusability, and therefore, efficiency of the research process. In this article, we briefly review project management techniques. We specifically underline four main steps of project management: (1) definition and organization, (2) planning, (3) execution, and (4) evaluation, using practical examples from our own multidisciplinary plastic surgery research team. PMID:26710037

  1. A Goal Programming R&D (Research and Development) Project Funding Model of the U.S. Army Strategic Defense Command Using the Analytic Hierarchy Process.

    DTIC Science & Technology

    1987-09-01

    A187 899 A GOAL PROGRANNIN R&D (RESEARCH AND DEVELOPMENT) 1/2 PROJECT FUNDING MODEL 0 (U) NAVAL POSTGRADUATE SCHOOL MONTEREY CA S M ANDERSON SEP 87...PROGRAMMING R&D PROJECT FUNDING MODEL OF THE U.S. ARMY STRATEGIC DEFENSE COMMAND USING THE ANALYTIC HIERARCHY PROCESS by Steven M. Anderson September 1987...jACCESSION NO TITI E (Influde Securt ClauAIcatsrn) A Goal Programming R&D Project Funding Model of the U.S. Army Strategic Defense Command Using the

  2. Lessons Learned from Participatory Design in Dementia Care: Placing Care Partners at the Centre.

    PubMed

    Hendriks, Niels; Slegers, Karin; Wilkinson, Andrea

    2017-01-01

    In this paper we analyze the participatory design (PD) process of a health information technology (HIT) project. This project, AToM was situated in dementia care and involved partners from academia, industry and care. The analysis specifically focuses on the role of the care partners in the PD process. We will show that the conditions to enable 'good participatory design' were not fully met and we present a set of actions to prevent this in future HIT projects. Central to our recommended approach is placing the care partners at the centre of the PD project.

  3. Hanford Spent Nuclear Fuel Project recommended path forward

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fulton, J.C.

    The Spent Nuclear Fuel Project (the Project), in conjunction with the U.S. Department of Energy-commissioned Independent Technical Assessment (ITA) team, has developed engineered alternatives for expedited removal of spent nuclear fuel, including sludge, from the K Basins at Hanford. These alternatives, along with a foreign processing alternative offered by British Nuclear Fuels Limited (BNFL), were extensively reviewed and evaluated. Based on these evaluations, a Westinghouse Hanford Company (WHC) Recommended Path Forward for K Basins spent nuclear fuel has been developed and is presented in Volume I of this document. The recommendation constitutes an aggressive series of projects to construct andmore » operate systems and facilities to safely retrieve, package, transport, process, and store K Basins fuel and sludge. The overall processing and storage scheme is based on the ITA team`s proposed passivation and vault storage process. A dual purpose staging and vault storage facility provides an innovative feature which allows accelerated removal of fuel and sludge from the basins and minimizes programmatic risks beyond any of the originally proposed alternatives. The projects fit within a regulatory and National Environmental Policy Act (NEPA) overlay which mandates a two-phased approach to construction and operation of the needed facilities. The two-phase strategy packages and moves K Basins fuel and sludge to a newly constructed Staging and Storage Facility by the year 2000 where it is staged for processing. When an adjoining facility is constructed, the fuel is cycled through a stabilization process and returned to the Staging and Storage Facility for dry interim (40-year) storage. The estimated total expenditure for this Recommended Path Forward, including necessary new construction, operations, and deactivation of Project facilities through 2012, is approximately $1,150 million (unescalated).« less

  4. Development of a Rolling Process Design Tool for Use in Improving Hot Roll Slab Recovery

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Couch, R; Becker, R; Rhee, M

    2004-09-24

    Lawrence Livermore National Laboratory participated in a U. S. Department of Energy/Office of Industrial Technology sponsored research project 'Development of a Rolling Process Design Tool for Use in Improving Hot Roll Slab Recovery', as a Cooperative Agreement TC-02028 with the Alcoa Technical Center (ATC). The objective of the joint project with Alcoa is to develop a numerical modeling capability to optimize the hot rolling process used to produce aluminum plate. Product lost in the rolling process and subsequent recycling, wastes resources consumed in the energy-intensive steps of remelting and reprocessing the ingot. The modeling capability developed by project partners willmore » be used to produce plate more efficiently and with reduced product loss.« less

  5. Short Project-Based Learning with MATLAB Applications to Support the Learning of Video-Image Processing

    NASA Astrophysics Data System (ADS)

    Gil, Pablo

    2017-10-01

    University courses concerning Computer Vision and Image Processing are generally taught using a traditional methodology that is focused on the teacher rather than on the students. This approach is consequently not effective when teachers seek to attain cognitive objectives involving their students' critical thinking. This manuscript covers the development, implementation and assessment of a short project-based engineering course with MATLAB applications Multimedia Engineering being taken by Bachelor's degree students. The principal goal of all course lectures and hands-on laboratory activities was for the students to not only acquire image-specific technical skills but also a general knowledge of data analysis so as to locate phenomena in pixel regions of images and video frames. This would hopefully enable the students to develop skills regarding the implementation of the filters, operators, methods and techniques used for image processing and computer vision software libraries. Our teaching-learning process thus permits the accomplishment of knowledge assimilation, student motivation and skill development through the use of a continuous evaluation strategy to solve practical and real problems by means of short projects designed using MATLAB applications. Project-based learning is not new. This approach has been used in STEM learning in recent decades. But there are many types of projects. The aim of the current study is to analyse the efficacy of short projects as a learning tool when compared to long projects during which the students work with more independence. This work additionally presents the impact of different types of activities, and not only short projects, on students' overall results in this subject. Moreover, a statistical study has allowed the author to suggest a link between the students' success ratio and the type of content covered and activities completed on the course. The results described in this paper show that those students who took part in short projects made a significant improvement when compared to those who participated in long projects.

  6. DMD: a digital light processing application to projection displays

    NASA Astrophysics Data System (ADS)

    Feather, Gary A.

    1989-01-01

    Summary Revolutionary technologies achieve rapid product and subsequent business diffusion only when the in- ventors focus on technology application, maturation, and proliferation. A revolutionary technology is emerg- ing with micro-electromechanical systems (MEMS). MEMS are being developed by leveraging mature semi- conductor processing coupled with mechanical systems into complete, integrated, useful systems. The digital micromirror device (DMD), a Texas Instruments invented MEMS, has focused on its application to projec- tion displays. The DMD has demonstrated its application as a digital light processor, processing and produc- ing compelling computer and video projection displays. This tutorial discusses requirements in the projection display market and the potential solutions offered by this digital light processing system. The seminar in- cludes an evaluation of the market, system needs, design, fabrication, application, and performance results of a system using digital light processing solutions.

  7. An expert panel process to evaluate habitat restoration actions in the Columbia River estuary.

    PubMed

    Krueger, Kirk L; Bottom, Daniel L; Hood, W Gregory; Johnson, Gary E; Jones, Kim K; Thom, Ronald M

    2017-03-01

    We describe a process for evaluating proposed ecosystem restoration projects intended to improve survival of juvenile salmon in the Columbia River estuary (CRE). Changes in the Columbia River basin (northwestern USA), including hydropower development, have contributed to the listing of 13 salmon stocks as endangered or threatened under the U.S. Endangered Species Act. Habitat restoration in the CRE, from Bonneville Dam to the ocean, is part of a basin-wide, legally mandated effort to mitigate federal hydropower impacts on salmon survival. An Expert Regional Technical Group (ERTG) was established in 2009 to improve and implement a process for assessing and assigning "survival benefit units" (SBUs) to restoration actions. The SBU concept assumes site-specific restoration projects will increase juvenile salmon survival during migration through the 234 km CRE. Assigned SBUs are used to inform selection of restoration projects and gauge mitigation progress. The ERTG standardized the SBU assessment process to improve its scientific integrity, repeatability, and transparency. In lieu of experimental data to quantify the survival benefits of individual restoration actions, the ERTG adopted a conceptual model composed of three assessment criteria-certainty of success, fish opportunity improvements, and habitat capacity improvements-to evaluate restoration projects. Based on these criteria, an algorithm assigned SBUs by integrating potential fish density as an indicator of salmon performance. Between 2009 and 2014, the ERTG assessed SBUs for 55 proposed projects involving a total of 181 restoration actions located across 8 of 9 reaches of the CRE, largely relying on information provided in a project template based on the conceptual model, presentations, discussions with project sponsors, and site visits. Most projects restored tidal inundation to emergent wetlands, improved riparian function, and removed invasive vegetation. The scientific relationship of geomorphic and salmonid responses to restoration actions remains the foremost concern. Although not designed to establish a broad strategy for estuary restoration, the scoring process has adaptively influenced the types, designs, and locations of restoration proposals. The ERTG process may be a useful model for others who have unique ecosystem restoration goals and share some of our common challenges. Copyright © 2016 Elsevier Ltd. All rights reserved.

  8. 75 FR 77379 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-10

    ... Personnel Management Demonstration Project, Department of Navy, Office of Naval Research; Notice #0;#0..., authorizes the Secretary of Defense (SECDEF) to conduct personnel management demonstration projects at... to execute a process and plan to employ the Department's personnel management demonstration project...

  9. Project Management in Higher Education

    ERIC Educational Resources Information Center

    Alpert, Shannon Atkinson

    2011-01-01

    This study identified factors that influenced the use of project management in higher education research projects. Using a qualitative grounded theory approach that included in-depth interviews with assistant professors, the researcher examined how these individuals were using project management processes and tools and factors that enabled,…

  10. 75 FR 30197 - Science and Technology Reinvention Laboratory Personnel Management Demonstration Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-28

    ... adopt the Naval Research Laboratory (NRL) Personnel Management Demonstration Project with modifications... Secretary of Defense (SECDEF) to conduct personnel management demonstration projects at DoD laboratories... execute a process and plan to employ the personnel management demonstration project authorities granted to...

  11. Management of the Cs/Sr Capsule Project at the Hanford Site. Technology Readiness Assessment Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    The Federal Project Director (FPD) for the U.S. Department of Energy (DOE), Richland Operations Office (RL) Waste Management and D&D Division (WMD) requested a Technology Readiness Assessment (TRA) for the Management of the Cesium/Strontium Capsule Storage Project (MCSCP) at the Waste Encapsulation and Storage Facility (WESF) on the Hanford Site in Washington State. The MCSCP CD-1 TRA was performed by a team selected in collaboration between the Office of Environmental Management (EM) Chief Engineer (EM-3.3) and RL, WMD FPD. The TRA Team included subject matter and technical experts having experience in cask storage, process engineering, and system design who weremore » independent of the MCSCP, and the team was led by the Director of Operations and Processes from the EM Chief Engineer's Office (EM-3.32). Movement of the Cs/Sr capsules to dry storage, based on information from the conceptual design, involves (1) capsule packaging, (2) capsule transfer, and (3) capsule storage. The project has developed a conceptual process, described in 30059-R-02, "NAC Conceptual Design Report for the Management of the Cesium and Strontium Capsules Project", which identifies the five major activities in the process to complete the transfer from storage pool to pad-mounted cask storage. The process, shown schematically in Figure 1, is comprised of the following process steps: (1) loading capsules into the UCS; (2) UCS processing; (3) UCS insertion into the TSC Basket; (4) cask transport from WESF to CSA and (5) extended storage at the CSA.« less

  12. CHP Project Development

    EPA Pesticide Factsheets

    Access information and tools to support the CHP project development process, including identifying if your facility is a good fit for CHP, the steps involved with CHP project development, and policies and incentives supportive of CHP.

  13. Project Interface Requirements Process Including Shuttle Lessons Learned

    NASA Technical Reports Server (NTRS)

    Bauch, Garland T.

    2010-01-01

    Most failures occur at interfaces between organizations and hardware. Processing interface requirements at the start of a project life cycle will reduce the likelihood of costly interface changes/failures later. This can be done by adding Interface Control Documents (ICDs) to the Project top level drawing tree, providing technical direction to the Projects for interface requirements, and by funding the interface requirements function directly from the Project Manager's office. The interface requirements function within the Project Systems Engineering and Integration (SE&I) Office would work in-line with the project element design engineers early in the life cycle to enhance communications and negotiate technical issues between the elements. This function would work as the technical arm of the Project Manager to help ensure that the Project cost, schedule, and risk objectives can be met during the Life Cycle. Some ICD Lessons Learned during the Space Shuttle Program (SSP) Life Cycle will include the use of hardware interface photos in the ICD, progressive life cycle design certification by analysis, test, & operations experience, assigning interface design engineers to Element Interface (EI) and Project technical panels, and linking interface design drawings with project build drawings

  14. New procedures of ergonomics design in a large oil company.

    PubMed

    Alhadeff, Cynthia Mossé; Silva, Rosana Fernandes da; Reis, Márcia Sales dos

    2012-01-01

    This study presents the challenge involved in the negotiation and construction of a standard process in a major petroleum company that has the purpose of guiding the implementation of ergonomic studies in the development of projects, systemising the implementation of ergonomics design. The standard was created by a multi-disciplinary working group consisting of specialists in ergonomics, who work in a number of different areas of the company. The objective was to guide "how to" undertake ergonomics in all projects, taking into consideration the development of the ergonomic appraisals of work. It also established that all the process, in each project phase, should be accompanied by a specialist in ergonomics. This process as an innovation in the conception of projects in this company, signals a change of culture, and, for this reason requires broad dissemination throughout the several company leadership levels, and training of professionals in projects of ergonomics design. An implementation plan was also prepared and approved by the corporate governance, complementing the proposed challenge. In this way, this major oil company will implement new procedures of ergonomics design to promote health, safety, and wellbeing of the workforce, besides improving the performance and reliability of its systems and processes.

  15. Ares Project Overview - Quality in Design

    NASA Technical Reports Server (NTRS)

    Cianciola, Chris; Crane, Kenneth

    2008-01-01

    This presentation introduces the audience to the overall goals of the Ares Project, which include providing human access to low-Earth orbit, the Moon, and beyond. The presentation also provides an overview of with the vehicles that will execute those goals and progress made on the vehicles to date. The briefing will provide an introduction to Lean, Six Sigma, and Kaizen practices Ares will use to improve the overall effectiveness and quality of its efforts. Finally, the briefing includes a summary of Safety and Mission Assurance practices being implemented within[Ares to ensure safety and quality early in the design process. Integrating Safety and Mission Assurance in Design: This presentation describes how the Ares Projects are learning from the successes and failures of previous launch systems in order to maximize safety and reliability while maintaining fiscal responsibility. The Ares Projects are integrating Safer T and Mission Assurance into design activities and embracing independent assessments by Quality experts in thorough reviews of designs and processes. Incorporating Lean thinking into the design process, Ares is also streamlining existing processes and future manufacturing flows which will yield savings during production. Understanding the value of early involvement of Quality experts, the Ares Projects are leading launch vehicle development into the 21st century.

  16. Report on all ARRA Funded Technical Work

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None, None

    2013-10-05

    The main focus of this American Recovery and Reinvestment Act of 2009 (ARRA) funded project was to design an energy efficient carbon capture and storage (CCS) process using the Recipients membrane system for H{sub 2} separation and CO{sub 2} capture. In the ARRA-funded project, the Recipient accelerated development and scale-up of ongoing hydrogen membrane technology research and development (R&D). Specifically, this project focused on accelerating the current R&D work scope of the base program-funded project, involving lab scale tests, detail design of a 250 lb/day H{sub 2} process development unit (PDU), and scale-up of membrane tube and coating manufacturing. Thismore » project scope included the site selection and a Front End Engineering Design (FEED) study of a nominally 4 to 10 ton-per-day (TPD) Pre-Commercial Module (PCM) hydrogen separation membrane system. Process models and techno-economic analysis were updated to include studies on integration of this technology into an Integrated Gasification Combined Cycle (IGCC) power generation system with CCS.« less

  17. Mars Atmospheric In Situ Resource Utilization Projects at the Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Muscatello, A. C.; Hintze, P. E.; Caraccio, A. J.; Bayliss, J. A.; Karr, L. J.; Paley, M. S.; Marone, M. J.; Gibson, T. L.; Surma, J. M.; Mansell, J. M.; hide

    2016-01-01

    The atmosphere of Mars, which is approximately 95% carbon dioxide (CO2), is a rich resource for the human exploration of the red planet, primarily by the production of rocket propellants and oxygen for life support. Three recent projects led by NASA's Kennedy Space Center have been investigating the processing of CO2. The first project successfully demonstrated the Mars Atmospheric Processing Module (APM), which freezes CO2 with cryocoolers and combines sublimated CO2 with hydrogen to make methane and water. The second project absorbs CO2 with Ionic Liquids and electrolyzes it with water to make methane and oxygen, but with limited success so far. A third project plans to recover up to 100% of the oxygen in spacecraft respiratory CO2. A combination of the Reverse Water Gas Shift reaction and the Boudouard reaction eventually fill the reactor up with carbon, stopping the process. A system to continuously remove and collect carbon is under construction.

  18. Mars Atmospheric In Situ Resource Utilization Projects at the Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Muscatello, Anthony; Hintze, Paul; Meier, Anne; Bayliss, Jon; Karr, Laurel; Paley, Steve; Marone, Matt; Gibson, Tracy; Surma, Jan; Mansell, Matt; hide

    2016-01-01

    The atmosphere of Mars, which is 96 percent carbon dioxide (CO2), is a rich resource for the human exploration of the red planet, primarily by the production of rocket propellants and oxygen for life support. Three recent projects led by NASAs Kennedy Space Center have been investigating the processing of CO2. The first project successfully demonstrated the Mars Atmospheric Processing Module (APM), which freezes CO2 with cryocoolers and combines sublimated CO2 with hydrogen to make methane and water. The second project absorbs CO2 with Ionic Liquids and electrolyzes it with water to make methane and oxygen, but with limited success so far. A third project plans to recover up to 100 of the oxygen in spacecraft respiratory CO2. A combination of the Reverse Water Gas Shift reaction and the Boudouard reaction eventually fill the reactor up with carbon, stopping the process. A system to continuously remove and collect carbon has been tested with encouraging results.

  19. Physics Parameterization for Seasonal Prediction

    DTIC Science & Technology

    2013-09-30

    particularly the Madden Julian Oscillation (MJO). We are continuing our participation in the project “Vertical Structure and Diabatic Processes of...Results are shown for: a) TRMM rainfall, b) NAVGEM 20-year run submitted for the YOTC/GEWEX project “Vertical Structure and Diabatic Processes of the MJO

  20. Designing Training Materials for Developing Countries.

    ERIC Educational Resources Information Center

    Rosenweig, Fred

    1984-01-01

    Describes four training guides developed by the Water and Sanitation for Health Project for use in rural water supply and sanitation projects in developing countries, explains the development process, offers insights gained from the process, and presents five considerations for designing training in third world countries. (MBR)

  1. 0-6820: A process for designating and managing overweight truck routes in coastal port regions [project summary

    DOT National Transportation Integrated Search

    2017-01-01

    The project developed a process to evaluate potential oversize/overweight (OS/OW) freight corridors that will serve Texas coastal port regions and border ports of entry (POEs); such evaluations provide valuable input during legislative inquiries and ...

  2. Impact of hydroelectric development upon a northern Manitoba native community

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Waldram, J.B.

    1983-01-01

    This dissertation describes the process of underdevelopment among the Cree Indian people of South Indian Lake, in Northern Manitoba, Canada, following the construction of the Churchill-Nelson River Hydro Project in 1975. The dissertation seeks to link the ecological, political, economic, socio-cultural and health aspects of the impact of the hydro project within the framework of the historical process of underdevelopment as it has occurred in Latin America, among Native people in the United States, and among Native people in Northern Canada. Utilizing both qualitative and quantitative data, a process of increased dependence is described as the product of two relatedmore » processes. The first process is the impairment of the local commercial and domestic economy caused by the flooding of Southern Indian Lake, which has resulted in a decline in local productivity. The second process is the enhancement of consumerism through rising consumer expectations and a post-project increase in available goods and services which the people are increasingly unable to afford. The overall result has been a process of economic divergence at the local level. The dissertation concludes that the process of underdevelopment which has occurred in South Indian Lake has been the result primarily of changes in the local ecological system caused by the construction of the hydro project. These ecological changes have, in turn, resulted in secondary changes in the socio-economic system.« less

  3. A cost-benefit analysis for materials management information systems.

    PubMed

    Slapak-Iacobelli, L; Wilde, A H

    1993-02-01

    The cost-benefit analysis provided the system planners with valuable information that served many purposes. It answered the following questions: Why was the CCF undertaking this project? What were the alternatives? How much was it going to cost? And what was the expected outcome? The process of developing cost-benefit the document kept the project team focused. It also motivated them to involve additional individuals from materials management and accounts payable in its development. A byproduct of this involvement was buy-in and commitment to the project by everyone in these areas. Consequently, the project became a team effort championed by many and not just one. We were also able to introduce two new information system processes: 1) a management review process with goals and anticipated results, and 2) a quality assurance process that ensured the CCF had a better product in the end. The cost-benefit analysis provided a planning tool that assisted in successful implementation of an integrated materials management information system.

  4. Improving Immunization Rates Using Lean Six Sigma Processes: Alliance of Independent Academic Medical Centers National Initiative III Project

    PubMed Central

    Hina-Syeda, Hussaini; Kimbrough, Christina; Murdoch, William; Markova, Tsveti

    2013-01-01

    Background Quality improvement education and work in interdisciplinary teams is a healthcare priority. Healthcare systems are trying to meet core measures and provide excellent patient care, thus improving their Hospital Consumer Assessment of Healthcare Providers & Systems scores. Crittenton Hospital Medical Center in Rochester Hills, MI, aligned educational and clinical objectives, focusing on improving immunization rates against pneumonia and influenza prior to the rates being implemented as core measures. Improving immunization rates prevents infections, minimizes hospitalizations, and results in overall improved patient care. Teaching hospitals offer an effective way to work on clinical projects by bringing together the skill sets of residents, faculty, and hospital staff to achieve superior results. Methods We designed and implemented a structured curriculum in which interdisciplinary teams acquired knowledge on quality improvement and teamwork, while focusing on a specific clinical project: improving global immunization rates. We used the Lean Six Sigma process tools to quantify the initial process capability to immunize against pneumococcus and influenza. Results The hospital's process to vaccinate against pneumonia overall was operating at a Z score of 3.13, and the influenza vaccination Z score was 2.53. However, the process to vaccinate high-risk patients against pneumonia operated at a Z score of 1.96. Improvement in immunization rates of high-risk patients became the focus of the project. After the implementation of solutions, the process to vaccinate high-risk patients against pneumonia operated at a Z score of 3.9 with a defects/million opportunities rate of 9,346 and a yield of 93.5%. Revisions to the adult assessment form fixed 80% of the problems identified. Conclusions This process improvement project was not only beneficial in terms of improved quality of patient care but was also a positive learning experience for the interdisciplinary team, particularly for the residents. The hospital has completed quality improvement projects in the past; however, this project was the first in which residents were actively involved. The didactic components and experiential learning were powerfully synergistic. This and similar projects can have far-reaching implications in terms of promoting patient health and improving the quality of care delivered by the healthcare systems and teaching hospitals. PMID:24052758

  5. 49 CFR 611.7 - Relation to planning and project development processes.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (ii) Two years after the project opens for revenue service, the grantee shall collect the “after” data... the project. (i) The plan shall provide for: Collection of “before” data on the current transit system... project; collection of “after” data on the transit system two years after opening of the new start project...

  6. 42 CFR 137.340 - May a Self-Governance Tribe contribute funding to a project?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false May a Self-Governance Tribe contribute funding to a... Project Assumption Process § 137.340 May a Self-Governance Tribe contribute funding to a project? Yes, the Self-Governance Tribe and the Secretary may jointly fund projects. The construction project agreement...

  7. 42 CFR 137.340 - May a Self-Governance Tribe contribute funding to a project?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false May a Self-Governance Tribe contribute funding to a... Project Assumption Process § 137.340 May a Self-Governance Tribe contribute funding to a project? Yes, the Self-Governance Tribe and the Secretary may jointly fund projects. The construction project agreement...

  8. 42 CFR 137.340 - May a Self-Governance Tribe contribute funding to a project?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false May a Self-Governance Tribe contribute funding to a... Project Assumption Process § 137.340 May a Self-Governance Tribe contribute funding to a project? Yes, the Self-Governance Tribe and the Secretary may jointly fund projects. The construction project agreement...

  9. 42 CFR 137.340 - May a Self-Governance Tribe contribute funding to a project?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May a Self-Governance Tribe contribute funding to a... Project Assumption Process § 137.340 May a Self-Governance Tribe contribute funding to a project? Yes, the Self-Governance Tribe and the Secretary may jointly fund projects. The construction project agreement...

  10. The Interactions among Information Technology Organizational Learning, Project Learning, and Project Success

    ERIC Educational Resources Information Center

    McKay, Donald S., II

    2012-01-01

    Knowledge gained from completed information technology (IT) projects was not often shared with emerging project teams. Learning lessons from other project teams was not pursued because people lack time, do not see value in learning, fear a potentially painful process, and had concerns that sharing knowledge will hurt their career. Leaders could…

  11. Impact of Cognitive Load on Family Decision Makers' Recall and Understanding of Donation Requests for the Genotype-Tissue Expression (GTEx) Project.

    PubMed

    Siminoff, Laura A; Wilson-Genderson, Maureen; Mosavel, Maghboeba; Barker, Laura; Trgina, Jennifer; Traino, Heather M; Nathan, Howard M; Hasz, Richard D; Walters, Gary

    2018-01-01

    Genomic research projects that collect tissues from deceased organ and tissue donors must obtain the authorization of family decision makers under difficult circumstances that may affect the authorization process. Using a quasi-experimental design, the Ethical, Legal, and Social Issues (ELSI) substudy of the Genotype-Tissue Expression (GTEx) project compared the recall and understanding of the donation authorization process of two groups: family members who had authorized donation of tissues to the GTEx project (the comparison group) and family members who had authorized organ and tissue donations in years previous, who subsequently participated in two different mock-authorization processes that mimicked the GTEx authorization process (the intervention groups). Participants in the comparison and intervention groups were matched on key demographic characteristics. We found that participants in the intervention groups who experienced a mock-authorization process demonstrated better recall of the tissue donation request than members of the comparison group. Our data indicate that the stress associated with the loss of a loved one limited the ability of family members to recall details about the GTEx project. However, we found a similar lack of knowledge in both the comparison and the intervention group participants, suggesting lack of knowledge may be due to the complexity and unfamiliarity of the information presented to them during the authorization process. We discuss these findings in the context of everyday clinical decision making in cognitively challenging conditions. Copyright 2018 The Journal of Clinical Ethics. All rights reserved.

  12. 23 CFR 940.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... of Transportation (DOT) and is available on the DOT web site at http://www.its.dot.gov. Project level... projects or groups of projects. Systems engineering is a structured process for arriving at a final design...

  13. 23 CFR 940.3 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... of Transportation (DOT) and is available on the DOT web site at http://www.its.dot.gov. Project level... projects or groups of projects. Systems engineering is a structured process for arriving at a final design...

  14. Performance measures for evaluating multi-state projects.

    DOT National Transportation Integrated Search

    2011-09-01

    "Freight transportation projects require an analytic process that considers the impacts of geographic and industry distribution of project : benefits, intermodal impacts, and reliability, as well as the traditional benefits of time savings, safety en...

  15. Combinatorial Optimization in Project Selection Using Genetic Algorithm

    NASA Astrophysics Data System (ADS)

    Dewi, Sari; Sawaluddin

    2018-01-01

    This paper discusses the problem of project selection in the presence of two objective functions that maximize profit and minimize cost and the existence of some limitations is limited resources availability and time available so that there is need allocation of resources in each project. These resources are human resources, machine resources, raw material resources. This is treated as a consideration to not exceed the budget that has been determined. So that can be formulated mathematics for objective function (multi-objective) with boundaries that fulfilled. To assist the project selection process, a multi-objective combinatorial optimization approach is used to obtain an optimal solution for the selection of the right project. It then described a multi-objective method of genetic algorithm as one method of multi-objective combinatorial optimization approach to simplify the project selection process in a large scope.

  16. An Initial Evaluation of Siting Considerations on Current and Future Wind Deployment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Tegen, Suzanne; Lantz, Eric; Mai, Trieu

    This report provides a deeper understanding of the wind project development process, from desktop studies to a successful project in the ground. It examines three siting consideration categories that wind project sponsors must include in the development process: wildlife (species that live in, near, or migrate through the area where wind development is possible), radar (wind turbines can cause interference with radar signals), and public engagement (representing communities and stakeholders who live near wind power projects). The research shows that although this country's abundant wind resource provides numerous options for addressing siting considerations, actually siting individual projects is becoming moremore » difficult because of regulatory and other uncertainties. Model results are based on the premise that developers will be able to site, permit, and build successful projects, which is not always the case in reality.« less

  17. RDD-100 and the systems engineering process

    NASA Technical Reports Server (NTRS)

    Averill, Robert D.

    1994-01-01

    An effective systems engineering approach applied through the project life cycle can help Langley produce a better product. This paper demonstrates how an enhanced systems engineering process for in-house flight projects assures that each system will achieve its goals with quality performance and within planned budgets and schedules. This paper also describes how the systems engineering process can be used in combination with available software tools.

  18. Laser Processed Heat Exchangers

    NASA Technical Reports Server (NTRS)

    Hansen, Scott

    2017-01-01

    The Laser Processed Heat Exchanger project will investigate the use of laser processed surfaces to reduce mass and volume in liquid/liquid heat exchangers as well as the replacement of the harmful and problematic coatings of the Condensing Heat Exchangers (CHX). For this project, two scale unit test articles will be designed, manufactured, and tested. These two units are a high efficiency liquid/liquid HX and a high reliability CHX.

  19. Reforming The U.S. Security Assistance Export Process To Build Existing Capabilities

    DTIC Science & Technology

    2015-12-01

    NAVAL POSTGRADUATE SCHOOL MONTEREY, CALIFORNIA JOINT APPLIED PROJECT REFORMING THE U.S. SECURITY ASSISTANCE EXPORT PROCESS TO...December 2015 3. REPORT TYPE AND DATES COVERED Joint applied project 4. TITLE AND SUBTITLE REFORMING THE U.S. SECURITY ASSISTANCE EXPORT PROCESS TO...the programs. While acknowledging the expanding role of the programs, the findings indicate a need for reforms in the export -control mechanisms

  20. AAFE man-made noise experiment project. Volume 2: Project and experiment discussions

    NASA Technical Reports Server (NTRS)

    1974-01-01

    An experiment for the acquisition and processing of man-made noise interference data on earth orbital altitudes is discussed. The objectives of the project are to confirm the results of analytical studies concerning radio frequency man-made noise in space. It is stated that the measurements of the amounts and types of noise in frequency bands of interest could allow the allocation and utilization of frequencies to be optimized and would also contribute to the engineering objective of optimizing flight receiving systems. A second objective of the project was to design and fabricate a noise measuring receiver which would demonstrate the feasibility of the experiment design under the project. The procedures for acquiring and processing the electromagnetic radiation data are discussed.

  1. Sensitivity analysis of the add-on price estimate for the silicon web growth process

    NASA Technical Reports Server (NTRS)

    Mokashi, A. R.

    1981-01-01

    The web growth process, a silicon-sheet technology option, developed for the flat plate solar array (FSA) project, was examined. Base case data for the technical and cost parameters for the technical and commercial readiness phase of the FSA project are projected. The process add on price, using the base case data for cost parameters such as equipment, space, direct labor, materials and utilities, and the production parameters such as growth rate and run length, using a computer program developed specifically to do the sensitivity analysis with improved price estimation are analyzed. Silicon price, sheet thickness and cell efficiency are also discussed.

  2. Working capital management in the process of financial support of investment and construction projects and of the construction material industry

    NASA Astrophysics Data System (ADS)

    Danilochkina, Nadezhda; Lukmanova, Inessa; Roshchina, Olga; Voytolovskiy, Nikolay

    2018-03-01

    The article presents the analysis of working capital in the process of financial support of high-rise construction investment projects. The factors influencing the choice of the working capital management model were analyzed, the reasons of the change in the requirement for the values of current assets in the process of construction of high-rise facilities were determined. The author has developed the scheme of interrelation between production, operational and financial activity cycles of enterprises implementing investment projects of unique buildings and structures and made a comparative description of their financing sources.

  3. Approach to Low-Cost High-Efficiency OLED Lighting. Building Technologies Solid State Lighting (SSL) Program Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pei, Qibing

    2017-10-06

    This project developed an integrated substrate which organic light emitting diode (OLED) panel developers could employ the integrated substrate to fabricate OLED devices with performance and projected cost meeting the MYPP targets of the Solid State Lighting Program of the Department of Energy. The project optimized the composition and processing conditions of the integrated substrate for OLED light extraction efficiency and overall performance. The process was further developed for scale up to a low-cost process and fabrication of prototype samples. The encapsulation of flexible OLEDs based on this integrated substrate was also investigated using commercial flexible barrier films.

  4. Earth Sciences Data and Information System (ESDIS) program planning and evaluation methodology development

    NASA Technical Reports Server (NTRS)

    Dickinson, William B.

    1995-01-01

    An Earth Sciences Data and Information System (ESDIS) Project Management Plan (PMP) is prepared. An ESDIS Project Systems Engineering Management Plan (SEMP) consistent with the developed PMP is also prepared. ESDIS and related EOS program requirements developments, management and analysis processes are evaluated. Opportunities to improve the effectiveness of these processes and program/project responsiveness to requirements are identified. Overall ESDIS cost estimation processes are evaluated, and recommendations to improve cost estimating and modeling techniques are developed. ESDIS schedules and scheduling tools are evaluated. Risk assessment, risk mitigation strategies and approaches, and use of risk information in management decision-making are addressed.

  5. Negotiating a Systems Development Method

    NASA Astrophysics Data System (ADS)

    Karlsson, Fredrik; Hedström, Karin

    Systems development methods (or methods) are often applied in tailored version to fit the actual situation. Method tailoring is in most the existing literature viewed as either (a) a highly rational process with the method engineer as the driver where the project members are passive information providers or (b) an unstructured process where the systems developer makes individual choices, a selection process without any driver. The purpose of this chapter is to illustrate that important design decisions during method tailoring are made by project members through negotiation. The study has been carried out using the perspective of actor-network theory. Our narratives depict method tailoring as more complex than (a) and (b) show the driver role rotates between the project members, and design decisions are based on influences from several project members. However, these design decisions are not consensus decisions.

  6. Meeting the challenge of policy-relevant science: lessons from a water resource project

    USGS Publications Warehouse

    Lamb, Berton L.

    1986-01-01

    Water resource scientists face complex tasks in evaluating aspects of water projects, but relatively few assessment procedures have been applied and accepted as standard applications. Decision-makers often rely on environmental assessments to evaluate the value and operation of projects. There is often confusion about scientists' role in policy decisions. The scientist can affect policy-making as an expert withess, an advocate or a surrogate. By understanding the policy process, scientists can make their work more “policy relevant.” Using the Terror Lake hydro project in Alaska as a guide, three lessons are discussed: (1) not all problems are able to be solved with technology; (2) policy-relevant technology is rarely imposed on a problem; and (3) the scientist need not just react to the policy process, but can have an impact on how that process unfolds.

  7. INcreasing Security and Protection through Infrastructure REsilience: The INSPIRE Project

    NASA Astrophysics Data System (ADS)

    D'Antonio, Salvatore; Romano, Luigi; Khelil, Abdelmajid; Suri, Neeraj

    The INSPIRE project aims at enhancing the European potential in the field of security by ensuring the protection of critical information infrastructures through (a) the identification of their vulnerabilities and (b) the development of innovative techniques for securing networked process control systems. To increase the resilience of such systems INSPIRE will develop traffic engineering algorithms, diagnostic processes and self-reconfigurable architectures along with recovery techniques. Hence, the core idea of the INSPIRE project is to protect critical information infrastructures by appropriately configuring, managing, and securing the communication network which interconnects the distributed control systems. A working prototype will be implemented as a final demonstrator of selected scenarios. Controls/Communication Experts will support project partners in the validation and demonstration activities. INSPIRE will also contribute to standardization process in order to foster multi-operator interoperability and coordinated strategies for securing lifeline systems.

  8. Geomechanical/Geochemical Modeling Studies Conducted within theInternational DECOVALEX Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Birkholzer, J.T.; Rutqvist, J.; Sonnenthal, E.L.

    2005-10-19

    The DECOVALEX project is an international cooperative project initiated by SKI, the Swedish Nuclear Power Inspectorate, with participation of about 10 international organizations. The general goal of this project is to encourage multidisciplinary interactive and cooperative research on modeling coupled thermo-hydro-mechanical-chemical (THMC) processes in geologic formations in support of the performance assessment for underground storage of radioactive waste. One of the research tasks, initiated in 2004 by the U.S. Department of Energy (DOE), addresses the long-term impact of geomechanical and geochemical processes on the flow conditions near waste emplacement tunnels. Within this task, four international research teams conduct predictive analysismore » of the coupled processes in two generic repositories, using multiple approaches and different computer codes. Below, we give an overview of the research task and report its current status.« less

  9. Geomechanical/ Geochemical Modeling Studies onducted Within the International DECOVALEX Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J.T. Birkholzer; J. Rutqvist; E.L. Sonnenthal

    2006-02-01

    The DECOVALEX project is an international cooperative project initiated by SKI, the Swedish Nuclear Power Inspectorate, with participation of about 10 international organizations. The general goal of this project is to encourage multidisciplinary interactive and cooperative research on modeling coupled thermo-hydro-mechanical-chemical (THMC) processes in geologic formations in support of the performance assessment for underground storage of radioactive waste. One of the research tasks, initiated in 2004 by the U.S. Department of Energy (DOE), addresses the long-term impact of geomechanical and geochemical processes on the flow conditions near waste emplacement tunnels. Within this task, four international research teams conduct predictive analysismore » of the coupled processes in two generic repositories, using multiple approaches and different computer codes. Below, we give an overview of the research task and report its current status.« less

  10. Mathematics authentic assessment on statistics learning: the case for student mini projects

    NASA Astrophysics Data System (ADS)

    Fauziah, D.; Mardiyana; Saputro, D. R. S.

    2018-03-01

    Mathematics authentic assessment is a form of meaningful measurement of student learning outcomes for the sphere of attitude, skill and knowledge in mathematics. The construction of attitude, skill and knowledge achieved through the fulfilment of tasks which involve active and creative role of the students. One type of authentic assessment is student mini projects, started from planning, data collecting, organizing, processing, analysing and presenting the data. The purpose of this research is to learn the process of using authentic assessments on statistics learning which is conducted by teachers and to discuss specifically the use of mini projects to improving students’ learning in the school of Surakarta. This research is an action research, where the data collected through the results of the assessments rubric of student mini projects. The result of data analysis shows that the average score of rubric of student mini projects result is 82 with 96% classical completeness. This study shows that the application of authentic assessment can improve students’ mathematics learning outcomes. Findings showed that teachers and students participate actively during teaching and learning process, both inside and outside of the school. Student mini projects also provide opportunities to interact with other people in the real context while collecting information and giving presentation to the community. Additionally, students are able to exceed more on the process of statistics learning using authentic assessment.

  11. HMI conventions for process control graphics.

    PubMed

    Pikaar, Ruud N

    2012-01-01

    Process operators supervise and control complex processes. To enable the operator to do an adequate job, instrumentation and process control engineers need to address several related topics, such as console design, information design, navigation, and alarm management. In process control upgrade projects, usually a 1:1 conversion of existing graphics is proposed. This paper suggests another approach, efficiently leading to a reduced number of new powerful process graphics, supported by a permanent process overview displays. In addition a road map for structuring content (process information) and conventions for the presentation of objects, symbols, and so on, has been developed. The impact of the human factors engineering approach on process control upgrade projects is illustrated by several cases.

  12. The Use of Photo-projects and Term Projects in Large-Format (200+ Students) Introductory Geology Courses.

    NASA Astrophysics Data System (ADS)

    Giles, A. N.; Wilkie, K. M.

    2008-12-01

    Photo-projects have long been utilized as a way of getting students in introductory geology courses to apply what they have learned in lecture to the outcrop and landscape. While the projects have many benefits, we have found that with large-format classes of 200+ students, where a mandatory field trip is logistically impossible, many problems can arise. One problem has been that of consistent and timely grading, which can be addressed by a project that can be turned in throughout the course of the semester and by utilizing a grading rubric. Also, in many cases, students simply take photographs of "scenery" and then try to identify features/processes with little thought as to whether that particular feature/process can occur in that geologic setting (such as identifying features as having a glacial origin in a non-glaciated terrain.) These types of problem can be attributed to the student's lack of knowledge of the geology of the area within which the photographs were taken and having little to no field instruction. Many of these problems can be addressed by utilizing a term project that combines elements of both research and the traditional photo project. The student chooses a specific area/region (i.e. a national park) that the student will/has actually visit(ed) and is then required to do background research before attempting to identify features and processes in photographs they have taken from the area. Here we present details of such a project that involves students performing research activities in three stages: The history/geologic setting of the area, the specific lithology of the area, and then the hydrology of the area, with each being completed at specified times throughout the semester. The final stage is the photo project component where the student identifies and interprets the features/processes in photographs from the area. The research provides the student with a framework within which they can identify and interpret the features/processes that are likely to be seen in their area.

  13. A Prototype for the Support of Integrated Software Process Development and Improvement

    NASA Astrophysics Data System (ADS)

    Porrawatpreyakorn, Nalinpat; Quirchmayr, Gerald; Chutimaskul, Wichian

    An efficient software development process is one of key success factors for quality software. Not only can the appropriate establishment but also the continuous improvement of integrated project management and of the software development process result in efficiency. This paper hence proposes a software process maintenance framework which consists of two core components: an integrated PMBOK-Scrum model describing how to establish a comprehensive set of project management and software engineering processes and a software development maturity model advocating software process improvement. Besides, a prototype tool to support the framework is introduced.

  14. Develop Improved Materials to Support the Hydrogen Economy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dr. Michael C. Martin

    The Edison Materials Technology Center (EMTEC) solicited and funded hydrogen infrastructure related projects that have a near term potential for commercialization. The subject technology of each project is related to the US Department of Energy hydrogen economy goals as outlined in the multi-year plan titled, 'Hydrogen, Fuel Cells and Infrastructure Technologies Program Multi-Year Research, Development and Demonstration Plan.' Preference was given to cross cutting materials development projects that might lead to the establishment of manufacturing capability and job creation. The Edison Materials Technology Center (EMTEC) used the US Department of Energy hydrogen economy goals to find and fund projects withmore » near term commercialization potential. An RFP process aligned with this plan required performance based objectives with go/no-go technology based milestones. Protocols established for this program consisted of a RFP solicitation process, white papers and proposals with peer technology and commercialization review (including DoE), EMTEC project negotiation and definition and DoE cost share approval. Our RFP approach specified proposals/projects for hydrogen production, hydrogen storage or hydrogen infrastructure processing which may include sensor, separator, compression, maintenance, or delivery technologies. EMTEC was especially alert for projects in the appropriate subject area that have cross cutting materials technology with near term manufacturing and commercialization opportunities.« less

  15. A Structured Process Description of a Pragmatic Implementation Project: Improving Integrated Care for Older Persons in Residential Care Homes

    PubMed Central

    Poot, Antonius J.; de Waard, Claudia S.; Wind, Annet W.; Caljouw, Monique A. A.; Gussekloo, Jacobijn

    2017-01-01

    Evaluation of the implementation of integrated care can differ from trial-based research due to complexity. Therefore, we examined whether a theory-based method for process description of implementation can contribute to improvement of evidence-based care. MOVIT, a Dutch project aimed at implementing integrated care for older vulnerable persons in residential care homes, was used as a case study. The project activities were defined according to implementation taxonomy and mapped in a matrix of theoretical levels and domains. Project activities mainly targeted professionals (both individual and group). A few activities targeted the organizational level, whereas none targeted the policy level, or the patient, or the “social, political, and legal” domains. However, the resulting changes in care delivery arrangement had consequences for professionals, patients, organizations, and the social, political, and legal domains. A structured process description of a pragmatic implementation project can help assess the fidelity and quality of the implementation, and identify relevant contextual factors for immediate adaptation and future research. The description showed that, in the MOVIT project, there was a discrepancy between the levels and domains targeted by the implementation activities and those influenced by the resulting changes in delivery arrangement. This could have influenced, in particular, the adoption and sustainability of the project. PMID:29161944

  16. A Structured Process Description of a Pragmatic Implementation Project: Improving Integrated Care for Older Persons in Residential Care Homes.

    PubMed

    Poot, Antonius J; de Waard, Claudia S; Wind, Annet W; Caljouw, Monique A A; Gussekloo, Jacobijn

    2017-01-01

    Evaluation of the implementation of integrated care can differ from trial-based research due to complexity. Therefore, we examined whether a theory-based method for process description of implementation can contribute to improvement of evidence-based care. MOVIT, a Dutch project aimed at implementing integrated care for older vulnerable persons in residential care homes, was used as a case study. The project activities were defined according to implementation taxonomy and mapped in a matrix of theoretical levels and domains. Project activities mainly targeted professionals (both individual and group). A few activities targeted the organizational level, whereas none targeted the policy level, or the patient, or the "social, political, and legal" domains. However, the resulting changes in care delivery arrangement had consequences for professionals, patients, organizations, and the social, political, and legal domains. A structured process description of a pragmatic implementation project can help assess the fidelity and quality of the implementation, and identify relevant contextual factors for immediate adaptation and future research. The description showed that, in the MOVIT project, there was a discrepancy between the levels and domains targeted by the implementation activities and those influenced by the resulting changes in delivery arrangement. This could have influenced, in particular, the adoption and sustainability of the project.

  17. A CMMI-based approach for medical software project life cycle study.

    PubMed

    Chen, Jui-Jen; Su, Wu-Chen; Wang, Pei-Wen; Yen, Hung-Chi

    2013-01-01

    In terms of medical techniques, Taiwan has gained international recognition in recent years. However, the medical information system industry in Taiwan is still at a developing stage compared with the software industries in other nations. In addition, systematic development processes are indispensable elements of software development. They can help developers increase their productivity and efficiency and also avoid unnecessary risks arising during the development process. Thus, this paper presents an application of Light-Weight Capability Maturity Model Integration (LW-CMMI) to Chang Gung Medical Research Project (CMRP) in the Nuclear medicine field. This application was intended to integrate user requirements, system design and testing of software development processes into three layers (Domain, Concept and Instance) model. Then, expressing in structural System Modeling Language (SysML) diagrams and converts part of the manual effort necessary for project management maintenance into computational effort, for example: (semi-) automatic delivery of traceability management. In this application, it supports establishing artifacts of "requirement specification document", "project execution plan document", "system design document" and "system test document", and can deliver a prototype of lightweight project management tool on the Nuclear Medicine software project. The results of this application can be a reference for other medical institutions in developing medical information systems and support of project management to achieve the aim of patient safety.

  18. Application of ESE Data and Tools to Air Quality Management: Services for Helping the Air Quality Community use ESE Data (SHAirED)

    NASA Technical Reports Server (NTRS)

    Falke, Stefan; Husar, Rudolf

    2011-01-01

    The goal of this REASoN applications and technology project is to deliver and use Earth Science Enterprise (ESE) data and tools in support of air quality management. Its scope falls within the domain of air quality management and aims to develop a federated air quality information sharing network that includes data from NASA, EPA, US States and others. Project goals were achieved through a access of satellite and ground observation data, web services information technology, interoperability standards, and air quality community collaboration. In contributing to a network of NASA ESE data in support of particulate air quality management, the project will develop access to distributed data, build Web infrastructure, and create tools for data processing and analysis. The key technologies used in the project include emerging web services for developing self describing and modular data access and processing tools, and service oriented architecture for chaining web services together to assemble customized air quality management applications. The technology and tools required for this project were developed within DataFed.net, a shared infrastructure that supports collaborative atmospheric data sharing and processing web services. Much of the collaboration was facilitated through community interactions through the Federation of Earth Science Information Partners (ESIP) Air Quality Workgroup. The main activities during the project that successfully advanced DataFed, enabled air quality applications and established community-oriented infrastructures were: develop access to distributed data (surface and satellite), build Web infrastructure to support data access, processing and analysis create tools for data processing and analysis foster air quality community collaboration and interoperability.

  19. Using project life-cycles as guide for timing the archival of scientific data and supporting documentation

    NASA Astrophysics Data System (ADS)

    Martinez, E.; Glassy, J. M.; Fowler, D. K.; Khayat, M.; Olding, S. W.

    2014-12-01

    The NASA Earth Science Data Systems Working Groups (ESDSWG) focuses on improving technologies and processes related to science discovery and preservation. One particular group, the Data Preservation Practices, is defining a set of guidelines to aid data providers in planning both what to submit for archival, and when to submit artifacts, so that the archival process can begin early in the project's life cycle. This has the benefit of leveraging knowledge within the project before staff roll off to other work. In this poster we describe various project archival use cases and identify possible archival life cycles that map closely to the pace and flow of work. To understand "archival life cycles", i.e., distinct project phases that produce archival artifacts such as instrument capabilities, calibration reports, and science data products, the workig group initially mapped the archival requirements defined in the Preservation Content Specification to the typical NASA project life cycle. As described in the poster, this work resulted in a well-defined archival life cycle, but only for some types of projects; it did not fit well for condensed project life cycles experienced within airborne and balloon campaigns. To understand the archival process for projects with compressed cycles, the working group gathered use cases from various communities. This poster will describe selected uses cases that provided insight into the unique flow of these projects, as well as proposing archival life cycles that map artifacts to projects with compressed timelines. Finally, the poster will conclude with some early recommendations for data providers, which will be captured in a formal Guidelines document - to be published in 2015.

  20. 77 FR 43184 - Allocation of Capacity on New Merchant Transmission Projects and New Cost-Based, Participant...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-24

    ... a report with the Commission describing the solicitation, selection and negotiation process. The... report to the Commission describing the solicitation, selection and negotiation process. The Commission... allocate 100 percent of their projects' capacity through bilateral negotiations with identified customers...

  1. PROCESS WATER BUILDING, TRA605. FLASH EVAPORATOR, CONDENSER (PROJECT FROM EVAPORATOR), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    PROCESS WATER BUILDING, TRA-605. FLASH EVAPORATOR, CONDENSER (PROJECT FROM EVAPORATOR), AND STEAM EJECTOR (ALONG REAR WALL). INL NEGATIVE NO. 4377. M.H. Bartz, Photographer, 3/5/1952 - Idaho National Engineering Laboratory, Test Reactor Area, Materials & Engineering Test Reactors, Scoville, Butte County, ID

  2. Implementing Learner-Centered Educational Strategies: The Bloomington Project School

    ERIC Educational Resources Information Center

    Dutta, Pratima

    2014-01-01

    The Bloomington Project School (BPS) is a charter school that has successfully adopted and implemented several learner-centered educational strategies. This case study offers a glimpse into its student-centered, collaborative, and interdisciplinary learning and teaching processes; its mastery-based assessment process; and its successful technology…

  3. Facilitating Problem Framing in Project-Based Learning

    ERIC Educational Resources Information Center

    Svihla, Vanessa; Reeve, Richard

    2016-01-01

    While problem solving is a relatively well understood process, problem framing is less well understood, particularly with regard to supporting students to learn as they frame problems. Project-based learning classrooms are an ideal setting to investigate how teachers facilitate this process. Using participant observation, this study investigated…

  4. Assessing Educational Needs in a Medical Specialty Society.

    ERIC Educational Resources Information Center

    Grosswald, Sarina J.; Bennof, Marvin J.

    1987-01-01

    The American College of Obstetricians and Gynecologists developed a needs assessment that provided a systematic approach to obtaining and reviewing data, identifying potential educational projects, and assigning project priorities. This paper describes that process, which incorporated use of a subcommittee, larger group process, and the Delphi…

  5. Manufacturing Demonstration Facility: Roll-to-Roll Processing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Datskos, Panos G; Joshi, Pooran C; List III, Frederick Alyious

    This Manufacturing Demonstration Facility (MDF)e roll-to-roll processing effort described in this report provided an excellent opportunity to investigate a number of advanced manufacturing approaches to achieve a path for low cost devices and sensors. Critical to this effort is the ability to deposit thin films at low temperatures using nanomaterials derived from nanofermentation. The overarching goal of this project was to develop roll-to-roll manufacturing processes of thin film deposition on low-cost flexible substrates for electronics and sensor applications. This project utilized ORNL s unique Pulse Thermal Processing (PTP) technologies coupled with non-vacuum low temperature deposition techniques, ORNL s clean roommore » facility, slot dye coating, drop casting, spin coating, screen printing and several other equipment including a Dimatix ink jet printer and a large-scale Kyocera ink jet printer. The roll-to-roll processing project had three main tasks: 1) develop and demonstrate zinc-Zn based opto-electronic sensors using low cost nanoparticulate structures manufactured in a related MDF Project using nanofermentation techniques, 2) evaluate the use of silver based conductive inks developed by project partner NovaCentrix for electronic device fabrication, and 3) demonstrate a suite of low cost printed sensors developed using non-vacuum deposition techniques which involved the integration of metal and semiconductor layers to establish a diverse sensor platform technology.« less

  6. Implementation of Multiple Intelligences Supported Project-Based Learning in EFL/ESL Classrooms

    ERIC Educational Resources Information Center

    Bas, Gokhan

    2008-01-01

    This article deals with the implementation of Multiple Intelligences supported Project-Based learning in EFL/ESL Classrooms. In this study, after Multiple Intelligences supported Project-based learning was presented shortly, the implementation of this learning method into English classrooms. Implementation process of MI supported Project-based…

  7. 78 FR 26103 - Proposed Standard Operating Procedure (SOP) of the Aircraft Certification Service (AIR) Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-03

    ... (SOP) of the Aircraft Certification Service (AIR) Project Prioritization and Resource Management ACTION... procedure (SOP) describing the process used to prioritize certification projects and manage certification project resources when local resources are not available. DATES: Comments must be received on or before...

  8. Project Management in Instructional Design: ADDIE Is Not Enough

    ERIC Educational Resources Information Center

    Van Rooij, Shahron Williams

    2010-01-01

    In the digital age, instructional designers must possess both a sound instructional design knowledge base and solid project management skills that will enable them to complete courseware projects on time, on budget and in conformance with client expectations. Project management skills include the ability to apply repeatable processes, along with…

  9. 14 CFR 1274.203 - Solicitations/cooperative agreement notices.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... other criteria that will be evaluated during the selection process. (c) For its research projects, NASA may publish the expected project goals and objectives in terms of “What” the commercial recipient is... to the success of the project, for some projects the recipient's statement of work may be included as...

  10. 14 CFR 1274.203 - Solicitations/cooperative agreement notices.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... other criteria that will be evaluated during the selection process. (c) For its research projects, NASA may publish the expected project goals and objectives in terms of “What” the commercial recipient is... to the success of the project, for some projects the recipient's statement of work may be included as...

  11. 14 CFR 1274.203 - Solicitations/cooperative agreement notices.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... other criteria that will be evaluated during the selection process. (c) For its research projects, NASA may publish the expected project goals and objectives in terms of “What” the commercial recipient is... to the success of the project, for some projects the recipient's statement of work may be included as...

  12. Project-Based Module Development.

    ERIC Educational Resources Information Center

    Meel, R. M. van

    A project management design for modularizing higher education at open universities was developed and tested. Literature in the fields of project management and development of modular curriculum materials was reviewed and used as a basis for developing a project-based approach to the process of developing modules for self-instruction. According to…

  13. Low-cost solar array project and Proceedings of the 15th Project Integration Meeting

    NASA Technical Reports Server (NTRS)

    1980-01-01

    Progress made by the Low-Cost Solar Array Project during the period December 1979 to April 1980 is described. Project analysis and integration, technology development in silicon material, large area silicon sheet and encapsulation, production process and equipment development, engineering, and operation are included.

  14. 7 CFR 634.13 - Project applications.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 6 2014-01-01 2014-01-01 false Project applications. 634.13 Section 634.13..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Project Authorization and Funding § 634.13 Project applications. (a) The SRCWCC is to assure that a process exists to prepare the RCWP...

  15. 7 CFR 634.13 - Project applications.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 6 2013-01-01 2013-01-01 false Project applications. 634.13 Section 634.13..., DEPARTMENT OF AGRICULTURE LONG TERM CONTRACTING RURAL CLEAN WATER PROGRAM Project Authorization and Funding § 634.13 Project applications. (a) The SRCWCC is to assure that a process exists to prepare the RCWP...

  16. 49 CFR 80.7 - Application process.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the project and the applicant, such as sources and uses of funds for the project and a forecast of cash flows available to service all debt instruments. (c) An application for a project located in or...

  17. Using Lean Six Sigma Methodology to Improve a Mass Immunizations Process at the United States Naval Academy.

    PubMed

    Ha, Chrysanthy; McCoy, Donald A; Taylor, Christopher B; Kirk, Kayla D; Fry, Robert S; Modi, Jitendrakumar R

    2016-06-01

    Lean Six Sigma (LSS) is a process improvement methodology developed in the manufacturing industry to increase process efficiency while maintaining product quality. The efficacy of LSS application to the health care setting has not been adequately studied. This article presents a quality improvement project at the U.S. Naval Academy that uses LSS to improve the mass immunizations process for Midshipmen during in-processing. The process was standardized to give all vaccinations at one station instead of giving a different vaccination at each station. After project implementation, the average immunizations lead time decreased by 79% and staffing decreased by 10%. The process was shown to be in control with a capability index of 1.18 and performance index of 1.10, resulting in a defect rate of 0.04%. This project demonstrates that the LSS methodology can be applied successfully to the health care setting to make sustainable process improvements if used correctly and completely. Reprint & Copyright © 2016 Association of Military Surgeons of the U.S.

  18. Low Voltage Electron Beam Processing Final Report CRADA No. TC-645-93-A

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chen, H.; Wakalopulos, G.

    This CRADA project was established to develop a small, inexpensive sealed-tube electron beam processing system having immediate applications in industrial, high speed manufacturing processes, and in the Department of Energy (DOE) waste treatment/cleanup operations. The technical work involved the development and demonstration of a compact, sealed, 50-75 kilovolt (kV) EB generator prototype, including controls and power supply. The specific goals of this project were to develop a low cost vacuum tube capable of shooting an electron beam several inches into the air, and to demonstrate that wide area materials processing is feasible by stacking the tubes to produce continuous beams.more » During the project, we successfully demonstrated the producibility of a low cost electron beam system and several material processing operations of interest to US industry, DOE and, since September 11, 2001, the Homeland Security.« less

  19. Climbing the ladder: capability maturity model integration level 3

    NASA Astrophysics Data System (ADS)

    Day, Bryce; Lutteroth, Christof

    2011-02-01

    This article details the attempt to form a complete workflow model for an information and communication technologies (ICT) company in order to achieve a capability maturity model integration (CMMI) maturity rating of 3. During this project, business processes across the company's core and auxiliary sectors were documented and extended using modern enterprise modelling tools and a The Open Group Architectural Framework (TOGAF) methodology. Different challenges were encountered with regard to process customisation and tool support for enterprise modelling. In particular, there were problems with the reuse of process models, the integration of different project management methodologies and the integration of the Rational Unified Process development process framework that had to be solved. We report on these challenges and the perceived effects of the project on the company. Finally, we point out research directions that could help to improve the situation in the future.

  20. Bench-Scale Development of a Non-Aqueous Solvent (NAS) CO2 Capture Process for Coal-Fired Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lail, Marty

    The project aimed to advance RTI’s non-aqueous amine solvent technology by improving the solvent to reduce volatility, demonstrating long-term continuous operation at lab- (0.5 liters solvent) and bench-scale (~120 liters solvent), showing low reboiler heat duty measured during bench-scale testing, evaluating degradation products, building a rate-based process model, and evaluating the techno-economic performance of the process. The project team (RTI, SINTEF, Linde Engineering) and the technology performed well in each area of advancement. The modifications incorporated throughout the project enabled the attainment of target absorber and regenerator conditions for the process. Reboiler duties below 2,000 kJt/kg CO2 were observed inmore » a bench-scale test unit operated at RTI.« less

  1. Manned Spacecraft Requirements for Materials and Processes

    NASA Technical Reports Server (NTRS)

    Vaughn, Timothy P.

    2006-01-01

    A major cause of project failure can be attributed to an emphasized focus on end products and inadequate attention to resolving development risks during the initial phases of a project. The initial phases of a project, which we will call the "study period", are critical to determining project scope and costs, and can make or break most projects. If the requirements are not defined adequately, how can the scope be adequately determined, also how can the costs of the entire project be effectively estimated, and how can the risk of project success be accurately assessed? Using the proper material specifications and standards and incorporating these specifications and standards in the design process should be considered inherently crucial to the technical success of a project as just as importantly, crucial to the cost and schedule success. This paper will intertwine several important aspects or considerations for project success: 1) Characteristics of a "Good Material Requirement"; 2) Linking material requirements to the implementation of "Design for Manufacturing"; techniques and 3) The importance of decomposing materials requirements during the study phase/development phase to mitigate project risk for the maturation of technologies before the building of hardware.

  2. The communication in industrialised building system (IBS) construction project: Virtual environment

    NASA Astrophysics Data System (ADS)

    Pozin, Mohd Affendi Ahmad; Nawi, Mohd Nasrun Mohd

    2017-10-01

    Large portion of numbers team organization in the IBS construction sector is known are being fragmented. That is contributed from a segregation of construction activity thus create team working in virtually. Virtual team are the nature when teams are working in distributed area, across culture and time. Therefore, teams can be respond to the task without relocating to the site project and settle down a problem through information and communication technology (ICT). The emergence of virtual team are carry out by advancements in communication technologies as a medium to improve project team communication in project delivery process on IBS construction. Based on literature review from previous study and data collected from interviewing, this paper aim to identified communication challenges among project team members according to current project development practices in IBS construction project. Hence, in attempt to develop effective communication through the advantages of virtual team approach for IBS construction project. In order to ensure the data is gathered comprehensively and accurately, the data was collected from project managers by using semi structured interview method. It was found that virtual team approach could be enable competitive challenges on complexity in the construction project management process.

  3. Post-project geomorphic assessment of a large process-based river restoration project

    USGS Publications Warehouse

    Erwin, Susannah O.; Schmidt, John C.; Allred, Tyler M.

    2016-01-01

    This study describes channel changes following completion of the Provo River Restoration Project (PRRP), the largest stream restoration project in Utah and one of the largest projects in the United States in which a gravel-bed river was fully reconstructed. We summarize project objectives and the design process, and we analyze monitoring data collected during the first 7 years after project completion. Post-project channel adjustment during the study period included two phases: (i) an initial phase of rapid, but small-scale, adjustment during the first years after stream flow was introduced to the newly constructed channel and (ii) a subsequent period of more gradual topographic adjustment and channel migration. Analysis of aerial imagery and ground-survey data demonstrate that the channel has been more dynamic in the downstream 4 km where a local source contributes a significant annual supply of bed material. Here, the channel migrates and exhibits channel adjustments that are more consistent with project objectives. The upstream 12 km of the PRRP are sediment starved, the channel has been laterally stable, and this condition may not be consistent with large-scale project objectives.

  4. Using guided inquiry and the information search process to develop research confidence among first year anatomy students.

    PubMed

    Bentley, Danielle Christine; Robinson, Andrea Cristina; Ruscitti, Robert Joseph

    2015-01-01

    With the growing volume of obtainable medical information and scientific literature, it is crucial that students in the field of allied health professions develop and refine the research skill set necessary to effectively find, retrieve, analyze, and use this information. This skill set can be effectively developed using student inquiry; an active learning process where students answer questions using research and data analysis. Therefore, with the pedagogical goal of developing information literacy among a cohort of allied health professional trainees, first year students studying human anatomy completed inquiry-based projects that were structured within the framework of the Information Search Process. This article thoroughly describes the conceptualization, creation, improvement, implementation, and assessment of the projects beginning with version one, the Student Inquiry Projects. Following a pilot of the Student Inquiry Projects various evidence-based improvements resulted in the final project version called the Inquiry Guided Learning Projects (IGLPs). A full assessment of the IGLPs revealed that students' self-perceived confidence improved for all tested research skills including: research question development, research question selection, exploration of peer-review literature, acquisition of resources, effective communication of results, and literature citation (all P < 0.05). Furthermore, six months following project completion students retained improved confidence in research question development and effective communication of results, with 90% of students indicating the IGLPs were directly responsible for these improvements. By guiding students through the Information Search Process, the IGLPs successfully developed research confidence among allied health trainees. © 2015 American Association of Anatomists.

  5. Cellulosic Biomass Sugars to Advantaged Jet Fuel – Catalytic Conversion of Corn Stover to Energy Dense, Low Freeze Point Paraffins and Naphthenes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cortright, Randy

    The purpose of this project was to demonstrate the technical and commercial feasibility of producing liquid fuels, particularly jet fuel, from lignocellulosic materials, such as corn stover. This project was led by Virent, Inc. (Virent) which has developed a novel chemical catalytic process (the BioForming ® platform) capable of producing “direct replacement” liquid fuels from biomass-derived feedstocks. Virent has shown it is possible to produce an advantaged jet fuel from biomass that meets or exceeds specifications for commercial and military jet fuel through Fuel Readiness Level (FRL) 5, Process Validation. This project leveraged The National Renewable Energy Lab’s (NREL) expertisemore » in converting corn stover to sugars via dilute acid pretreatment and enzymatic hydrolysis. NREL had previously developed this deconstruction technology for the conversion of corn stover to ethanol. In this project, Virent and NREL worked together to condition the NREL generated hydrolysate for use in Virent’s catalytic process through solids removal, contaminant reduction, and concentration steps. The Idaho National Laboratory (INL) was contracted in this project for the procurement, formatting, storage and analysis of corn stover and Northwestern University developed fundamental knowledge of lignin deconstruction that can help improve overall carbon recovery of the combined technologies. Virent conducted fundamental catalytic studies to improve the performance of the catalytic process and NREL provided catalyst characterization support. A technoeconomic analysis (TEA) was conducted at each stage of the project, with results from these analyses used to inform the direction of the project.« less

  6. Materials and process engineering projects for the Sandia National Laboratories/Newly Independent States Industrial Partnering Program. Volume 2

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zanner, F.J.; Moffatt, W.C.

    1995-07-01

    In July, 1994, a team of materials specialists from Sandia and US. Industry traveled to Russia and the Ukraine to select and fund projects in materials and process technology in support of the Newly Independent States/Industrial Partnering Program (NIS/IPP). All of the projects are collaborations with scientists and Engineers at NIS Institutes. Each project is scheduled to last one year, and the deliverables are formatted to supply US. Industry with information which will enable rational decisions to be made regarding the commercial value of these technologies. This work is an unedited interim compilation of the deliverables received to date.

  7. RAPID Toolkit Creates Smooth Flow Toward New Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Levine, Aaron; Young, Katherine

    2016-07-01

    Uncertainty about the duration and outcome of the permitting process has historically been seen as a deterrent to investment in renewable energy projects, including new hydropower projects. What if the process were clearer, smoother, faster? That's the purpose of the Regulatory and Permitting Information Desktop (RAPID) Toolkit, developed by the National Renewable Energy Laboratory (NREL) with funding from the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy and the Western Governors' Association. Now, the RAPID Toolkit is being expanded to include information about developing and permitting hydropower projects, with initial outreach and information gathering occurring duringmore » 2015.« less

  8. Refining Landsat classification results using digital terrain data

    USGS Publications Warehouse

    Miller, Wayne A.; Shasby, Mark

    1982-01-01

     Scientists at the U.S. Geological Survey's Earth Resources Observation systems (EROS) Data Center have recently completed two land-cover mapping projects in which digital terrain data were used to refine Landsat classification results. Digital ter rain data were incorporated into the Landsat classification process using two different procedures that required developing decision criteria either subjectively or quantitatively. The subjective procedure was used in a vegetation mapping project in Arizona, and the quantitative procedure was used in a forest-fuels mapping project in Montana. By incorporating digital terrain data into the Landsat classification process, more spatially accurate landcover maps were produced for both projects.

  9. The NCC project: A quality management perspective

    NASA Technical Reports Server (NTRS)

    Lee, Raymond H.

    1993-01-01

    The Network Control Center (NCC) Project introduced the concept of total quality management (TQM) in mid-1990. The CSC project team established a program which focused on continuous process improvement in software development methodology and consistent deliveries of high quality software products for the NCC. The vision of the TQM program was to produce error free software. Specific goals were established to allow continuing assessment of the progress toward meeting the overall quality objectives. The total quality environment, now a part of the NCC Project culture, has become the foundation for continuous process improvement and has resulted in the consistent delivery of quality software products over the last three years.

  10. Ethical considerations of research policy for personal genome analysis: the approach of the Genome Science Project in Japan.

    PubMed

    Minari, Jusaku; Shirai, Tetsuya; Kato, Kazuto

    2014-12-01

    As evidenced by high-throughput sequencers, genomic technologies have recently undergone radical advances. These technologies enable comprehensive sequencing of personal genomes considerably more efficiently and less expensively than heretofore. These developments present a challenge to the conventional framework of biomedical ethics; under these changing circumstances, each research project has to develop a pragmatic research policy. Based on the experience with a new large-scale project-the Genome Science Project-this article presents a novel approach to conducting a specific policy for personal genome research in the Japanese context. In creating an original informed-consent form template for the project, we present a two-tiered process: making the draft of the template following an analysis of national and international policies; refining the draft template in conjunction with genome project researchers for practical application. Through practical use of the template, we have gained valuable experience in addressing challenges in the ethical review process, such as the importance of sharing details of the latest developments in genomics with members of research ethics committees. We discuss certain limitations of the conventional concept of informed consent and its governance system and suggest the potential of an alternative process using information technology.

  11. The Role of Change Agents in Technology Adoption Process

    NASA Astrophysics Data System (ADS)

    Gyampoh-Vidogah, Regina; Moreton, Robert

    Although the total or partial failure of Information Technology (IT) projects are well documented such failures are not entirely technical in nature (Donohue et al, 2001). Project failures are often caused by lack of attention to social factors. (2002) identified ethical issues whilst (1999) and (2002) point to human factors, which in essence are the norms and culture of the implementation environment. On the. influence of culture on project success, (2003) noted that, the cultural problems are much bigger than the technical ones, adding: "The biggest hurdle is making people realise that information needs to be shared. It is only with this ethos of sharing information that take-up of technologies will be hastened." Consequently, research and debate about IT implementation is likely to continue until the development process is under better control (Nolan 1999). This state of constant evaluation is crucial because aborted IT projects are still common place. According to (1998), 31% of all corporate technology development projects resulted in cancellation. Although in broad terms, there seems to be ample evidence of the influence of non-technical factors on project failure the dynamics of how this happens is not widely discussed. There are some pointers to the dynamics of the process in literature.

  12. Fast, Accurate and Shift-Varying Line Projections for Iterative Reconstruction Using the GPU

    PubMed Central

    Pratx, Guillem; Chinn, Garry; Olcott, Peter D.; Levin, Craig S.

    2013-01-01

    List-mode processing provides an efficient way to deal with sparse projections in iterative image reconstruction for emission tomography. An issue often reported is the tremendous amount of computation required by such algorithm. Each recorded event requires several back- and forward line projections. We investigated the use of the programmable graphics processing unit (GPU) to accelerate the line-projection operations and implement fully-3D list-mode ordered-subsets expectation-maximization for positron emission tomography (PET). We designed a reconstruction approach that incorporates resolution kernels, which model the spatially-varying physical processes associated with photon emission, transport and detection. Our development is particularly suitable for applications where the projection data is sparse, such as high-resolution, dynamic, and time-of-flight PET reconstruction. The GPU approach runs more than 50 times faster than an equivalent CPU implementation while image quality and accuracy are virtually identical. This paper describes in details how the GPU can be used to accelerate the line projection operations, even when the lines-of-response have arbitrary endpoint locations and shift-varying resolution kernels are used. A quantitative evaluation is included to validate the correctness of this new approach. PMID:19244015

  13. Mapping a sustainable future: Community learning in dialogue at the science-society interface

    NASA Astrophysics Data System (ADS)

    Barth, Matthias; Lang, Daniel J.; Luthardt, Philip; Vilsmaier, Ulli

    2017-12-01

    In 2015, the German Federal Ministry of Education and Research (BMBF) announced that the Science Year 2015 would focus on the "City of the Future". It called for innovative projects from cities and communities in Germany dedicated to exploring future options and scenarios for sustainable development. Among the successful respondents was the city of Lüneburg, located in the north of Germany, which was awarded funding to establish a community learning project to envision a sustainable future ("City of the Future Lüneburg 2030+"). What made Lüneburg's approach unique was that the city itself initiated the project and invited a broad range of stakeholders to participate in a community learning process for sustainable development. The authors of this article use the project as a blueprint for sustainable city development. Presenting a reflexive case study, they report on the process and outcomes of the project and investigate community learning processes amongst different stakeholders as an opportunity for transformative social learning. They discuss outputs and outcomes (intended as well as unintended) in relation to the specific starting points of the project to provide a context-sensitive yet rich narrative of the case and to overcome typical criticisms of case studies in the field.

  14. Food Processors Skills Building Project. Evaluation Report.

    ERIC Educational Resources Information Center

    White, Eileen Casey

    The Food Processors Skills Building project was undertaken by four Oregon community colleges, with funds from the Oregon Economic Development Department and 11 local food processing companies, to address basic skills needs in the food processing industry through the development and implementation of an industry-specific curriculum. Based on…

  15. Technical Writing in Hydrogeology.

    ERIC Educational Resources Information Center

    Tinker, John R., Jr.

    1986-01-01

    A project for Writing Across the Curriculum at the University of Wisconsin-Eau Claire is described as a method to relate the process of writing to the process of learning hydrology. The project focuses on an actual groundwater contamination case and is designed to improve the technical writing skills of students. (JN)

  16. DEVELOPMENT OF A SCALABLE, LOW-COST, ULTRANANOCRYSTALLINE DIAMOND ELECTROCHEMICAL PROCESS FOR THE DESTRUCTION OF CONTAMINANTS OF EMERGING CONCERN (CECS) - PHASE II

    EPA Science Inventory

    This Small Business Innovation Research (SBIR) Phase II project will employ the large scale; highly reliable boron-doped ultrananocrystalline diamond (BD-UNCD®) electrodes developed during Phase I project to build and test Electrochemical Anodic Oxidation process (EAOP)...

  17. Federal Workplace Literacy Project. Internal Evaluation Report.

    ERIC Educational Resources Information Center

    Matuszak, David J.

    This report describes the following components of the Nestle Workplace Literacy Project: six job task analyses, curricula for six workplace basic skills training programs, delivery of courses using these curricula, and evaluation of the process. These six job categories were targeted for training: forklift loader/checker, BB's processing systems…

  18. Envisioning the Infinite by Projecting Finite Properties

    ERIC Educational Resources Information Center

    Ely, Robert

    2011-01-01

    We analyze interviews with 24 post-secondary students as they reason about infinite processes in the context of the tricky Tennis Ball Problem. By metaphorically projecting various properties from the finite states such as counting and indexing, participants envisioned widely varying final states for the infinite process. Depending on which…

  19. The Virtual Intercultural Team Tool

    ERIC Educational Resources Information Center

    Rus, Calin

    2010-01-01

    This article describes the Virtual Intercultural Team Tool (VITT) and discusses its processes and benefits. VIIT is a virtual platform designed with the aim of assisting European project teams to improve intercultural communication and build on their cultural diversity for effective implementation of their projects. It is a process-focused tool,…

  20. Nurturing the Imagination: Creativity Processes and Innovative Qualitative Research Projects

    ERIC Educational Resources Information Center

    Mulvihill, Thalia M.; Swaminathan, Raji

    2012-01-01

    This article explores the creativity processes involved in designing and analyzing innovative qualitative research projects and evaluates examples of recent models and typologies that illustrate a variety of ways to approach qualitative inquiry. Using Gardner's Five Minds (2006) typology, Boyer's Model of Scholarship (1997) and Bloom's Taxonomy of…

  1. 77 FR 61053 - Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-05

    ... suggestions on improving customer service at the Internal Revenue Service. DATES: The meeting will be held... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION...

  2. 77 FR 21156 - Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-09

    ... suggestions on improving customer service at the Internal Revenue Service. DATES: The meeting will be held... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee AGENCY: Internal Revenue Service (IRS), Treasury. ACTION...

  3. 77 FR 8328 - Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... suggestions on improving customer service at the Internal Revenue Service. DATES: The meeting will be held... DEPARTMENT OF THE TREASURY Internal Revenue Service Open Meeting of the Taxpayer Advocacy Panel Return Processing Delays Project Committee AGENCY: Internal Revenue Service (IRS) Treasury. ACTION...

  4. INPROF--Promoting Teamwork Processes and Interprofessional Collaboration in Emergency Work (2010-2012)

    ERIC Educational Resources Information Center

    Collin, Kaija; Paloniemi, Susanna; Herranen, Sanna

    2015-01-01

    This paper summarises the findings of a research project on interprofessional collaboration in the emergency unit of a major Finnish hospital. The findings are discussed through a broad conceptual framework which involves work process knowledge and interprofessional collaboration. The project, carried out from 2010-2012, investigated different…

  5. An Approach for Implementation of Project Management Information Systems

    NASA Astrophysics Data System (ADS)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  6. Book: Marine Bioacoustic Signal Processing and Analysis

    DTIC Science & Technology

    2011-09-30

    physicists , and mathematicians . However, more and more biologists and psychologists are starting to use advanced signal processing techniques and...Book: Marine Bioacoustic Signal Processing and Analysis 5a. CONTRACT NUMBER 5b. GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR(S) 5d. PROJECT ...chapters than it should be, since the project must be finished by Dec. 31. I have started setting aside 2 hours of uninterrupted per workday to work

  7. Apple Image Processing Educator

    NASA Technical Reports Server (NTRS)

    Gunther, F. J.

    1981-01-01

    A software system design is proposed and demonstrated with pilot-project software. The system permits the Apple II microcomputer to be used for personalized computer-assisted instruction in the digital image processing of LANDSAT images. The programs provide data input, menu selection, graphic and hard-copy displays, and both general and detailed instructions. The pilot-project results are considered to be successful indicators of the capabilities and limits of microcomputers for digital image processing education.

  8. Special Advanced Studies for Pollution Prevention. Delivery Order 0058: The Monitor - Spring 2000

    DTIC Science & Technology

    2001-04-01

    Process complexity ➨ Strippability ➨ Maturity ➨ Process type and chemistry ➨ Licensing requirements ➨ Vendor information ➨ Niplate 700 (Surface...Courses of Action 4 Identify & Evaluate Potential Alternatives 5 Select Best Alternative & Develop Project 6 Prioritize Projects by Commodity 7 Rank...Burden CS Priority Process Specific P2 OASolution Selection Solution Planning Solution Implementation Solution Evaluation Phase 2 Phase 3 Phase 1

  9. Tips and traps for reapplying used process plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Conder, M.W.

    1999-07-01

    Many gas processing projects are based on reapplying used gas processing plants and equipment. There has been little information or advice in the literature which provides practical advice for this type of project. GPA's Technical Section A Committee has been developing a monograph on experiences in reapplying used plants and equipment. This paper includes excerpts from that monograph and presents advice illustrated by recent experiences with used plants.

  10. A Case Study on an Item Writing Process: Use of Test Specifications, Nature of Group Dynamics, and Individual Item Writers' Characteristics

    ERIC Educational Resources Information Center

    Kim, Jiyoung; Chi, Youngshin; Huensch, Amanda; Jun, Heesung; Li, Hongli; Roullion, Vanessa

    2010-01-01

    This article discusses a case study on an item writing process that reflects on our practical experience in an item development project. The purpose of the article is to share our lessons from the experience aiming to demystify item writing process. The study investigated three issues that naturally emerged during the project: how item writers use…

  11. Process Definition and Modeling Guidebook. Version 01.00.02

    DTIC Science & Technology

    1992-12-01

    material (and throughout the guidebook)process defnition is considered to be the act of representing the important characteristics of a process in a...characterized by software standards and guidelines, software inspections and reviews, and more formalized testing (including test plans, test sup- port tools...paper-based approach works well for training, examples, and possibly even small pilot projects and case studies. However, large projects will benefit from

  12. Development and Validation of an Acid Mine Drainage Treatment Process for Source Water

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lane, Ann

    Throughout Northern Appalachia and surrounding regions, hundreds of abandoned mine sites exist which frequently are the source of Acid Mine Drainage (AMD). AMD typically contains metal ions in solution with sulfate ions which have been leached from the mine. These large volumes of water, if treated to a minimum standard, may be of use in Hydraulic Fracturing (HF) or other industrial processes. This project’s focus is to evaluate an AMD water treatment technology for the purpose of providing treated AMD as an alternative source of water for HF operations. The HydroFlex™ technology allows the conversion of a previous environmental liabilitymore » into an asset while reducing stress on potable water sources. The technology achieves greater than 95% water recovery, while removing sulfate to concentrations below 100 mg/L and common metals (e.g., iron and aluminum) below 1 mg/L. The project is intended to demonstrate the capability of the process to provide AMD as alternative source water for HF operations. The second budget period of the project has been completed during which Battelle conducted two individual test campaigns in the field. The first test campaign demonstrated the ability of the HydroFlex system to remove sulfate to levels below 100 mg/L, meeting the requirements indicated by industry stakeholders for use of the treated AMD as source water. The second test campaign consisted of a series of focused confirmatory tests aimed at gathering additional data to refine the economic projections for the process. Throughout the project, regular communications were held with a group of project stakeholders to ensure alignment of the project objectives with industry requirements. Finally, the process byproduct generated by the HydroFlex process was evaluated for the treatment of produced water against commercial treatment chemicals. It was found that the process byproduct achieved similar results for produced water treatment as the chemicals currently in use. Further, the process byproduct demonstrated better settling characteristics in bench scale testing. The field testing conducted in the second project budget period demonstrated the ability of the HydroFlex technology to meet industry requirements for AMD water chemical composition so that it can be used as source water in HF activities. System and operational improvements were identified in an additional series of confirmatory tests to achieve competitive cost targets. Finally, the application of the HydroFlex process byproduct in produced water treatment was demonstrated, further supporting the commercial implementation of the technology. Overall, the project results demonstrate a path to the economic treatment of AMD to support its increased use as source water in HF, particularly in regions with limited local freshwater availability.« less

  13. Measuring societal effects of transdisciplinary research projects: design and application of an evaluation method.

    PubMed

    Walter, Alexander I; Helgenberger, Sebastian; Wiek, Arnim; Scholz, Roland W

    2007-11-01

    Most Transdisciplinary Research (TdR) projects combine scientific research with the building of decision making capacity for the involved stakeholders. These projects usually deal with complex, societally relevant, real-world problems. This paper focuses on TdR projects, which integrate the knowledge of researchers and stakeholders in a collaborative transdisciplinary process through structured methods of mutual learning. Previous research on the evaluation of TdR has insufficiently explored the intended effects of transdisciplinary processes on the real world (societal effects). We developed an evaluation framework for assessing the societal effects of transdisciplinary processes. Outputs (measured as procedural and product-related involvement of the stakeholders), impacts (intermediate effects connecting outputs and outcomes) and outcomes (enhanced decision making capacity) are distinguished as three types of societal effects. Our model links outputs and outcomes of transdisciplinary processes via the impacts using a mediating variables approach. We applied this model in an ex post evaluation of a transdisciplinary process. 84 out of 188 agents participated in a survey. The results show significant mediation effects of the two impacts "network building" and "transformation knowledge". These results indicate an influence of a transdisciplinary process on the decision making capacity of stakeholders, especially through social network building and the generation of knowledge relevant for action.

  14. Systems Engineering in NASA's R&TD Programs

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2005-01-01

    Systems engineering is largely the analysis and planning that support the design, development, and operation of systems. The most common application of systems engineering is in guiding systems development projects that use a phased process of requirements, specifications, design, and development. This paper investigates how systems engineering techniques should be applied in research and technology development programs for advanced space systems. These programs should include anticipatory engineering of future space flight systems and a project portfolio selection process, as well as systems engineering for multiple development projects.

  15. Version control system of CAD documents and PLC projects

    NASA Astrophysics Data System (ADS)

    Khudyakov, P. Yu; Kisel’nikov, A. Yu; Startcev, I. M.; Kovalev, A. A.

    2018-05-01

    The paper presents the process of developing a version control system for CAD documents and PLC projects. The software was tested and the optimal composition of the modules was selected. The introduction of the system has made it possible to increase the safety and stability of the process control systems, as well as to reduce the number of conflicts for versions of CAD files. The number of incidents at the enterprise related to the use of incorrect versions of PLC projects is reduced to 0.

  16. The Development of a Course Sequence in Real-Time Systems Design

    DTIC Science & Technology

    1993-08-01

    project was implemented in C. 3 A group of students used the material learned in this course in their...homework assignments are used to assess the students learning U process. The term project is to be done in teams of 2 to 4 students and it starts very...assignments are used to assess the students learning I process. The term project is to be done in teams of 2 to 4 students and it starts very early in the

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Newman, J.R.; Maltby, J.H.

    The purpose of this presentation was to discuss the emerging role of financial entities in determining environmental requirements for international power projects. The paper outlines the following: emerging conditions; examples of announced privatization energy projects by country; types of government and international financial entity sources; problems for IPPs; similarity and differences between the World Bank and the USEPA; comparison of the international standards and regulations for power plants; recent trends/issues involving international power project approval; and recommendations for understanding/expediting the financial entities` environmental approval process and how to expedite this process.

  18. Managing risks in the project pipeline.

    DOT National Transportation Integrated Search

    2013-08-01

    This research focuses on how to manage the risks of project costs and revenue uncertainties over the long-term, and identifies significant : process improvements to ensure projects are delivered on time and as intended, thus maximizing the miles pave...

  19. Electronic construction collaboration system -- final phase : [tech transfer summary].

    DOT National Transportation Integrated Search

    2014-07-01

    Construction projects have been growing more complex in terms of : project team composition, design aspects, and construction processes. : To help manage the shop/working drawings and requests for information : (RFIs) for its large, complex projects,...

  20. Best Practices from WisDOT Mega- and ARRA Projects : Brief

    DOT National Transportation Integrated Search

    2012-03-01

    With the inception of the Marquette Interchange Project in 2004 Wisconsins first ever highway megaproject (over $500 million) WisDOT developed a number of new techniques, methods, processes and procedures for project management. The depart...

  1. Streamlining project delivery through risk analysis.

    DOT National Transportation Integrated Search

    2015-08-01

    Project delivery is a significant area of concern and is subject to several risks throughout Plan Development : Process (PDP). These risks are attributed to major areas of project development, such as environmental : analysis, right-of-way (ROW) acqu...

  2. Development of the Design Laboratory.

    ERIC Educational Resources Information Center

    Silla, Harry

    1986-01-01

    Describes the design laboratory at the Stevens Institute of Technology (SIT). Considers course objectives, design projects, project structure, mechanical design, project management, and laboratory operation. This laboratory complements SIT's course in process design, giving students a complete design experience. (JN)

  3. Strategies for improving transportation project delivery performance.

    DOT National Transportation Integrated Search

    2016-09-01

    project delivery performance for the various contracting methods that are : applicable for CTDOTs use. The report is structured in two parts. Part A covers overall : project deliverability and Part B is focused on environmental review processes an...

  4. Grey Comprehensive Evaluation of Biomass Power Generation Project Based on Group Judgement

    NASA Astrophysics Data System (ADS)

    Xia, Huicong; Niu, Dongxiao

    2017-06-01

    The comprehensive evaluation of benefit is an important task needed to be carried out at all stages of biomass power generation projects. This paper proposed an improved grey comprehensive evaluation method based on triangle whiten function. To improve the objectivity of weight calculation result of only reference comparison judgment method, this paper introduced group judgment to the weighting process. In the process of grey comprehensive evaluation, this paper invited a number of experts to estimate the benefit level of projects, and optimized the basic estimations based on the minimum variance principle to improve the accuracy of evaluation result. Taking a biomass power generation project as an example, the grey comprehensive evaluation result showed that the benefit level of this project was good. This example demonstrates the feasibility of grey comprehensive evaluation method based on group judgment for benefit evaluation of biomass power generation project.

  5. Social projection increases for positive targets: ascertaining the effect and exploring its antecedents.

    PubMed

    Machunsky, Maya; Toma, Claudia; Yzerbyt, Vincent; Corneille, Olivier

    2014-10-01

    Social projection denotes the attribution of characteristics of the self to others and, therefore, increases perceived self-other similarity. The present research tests the assumption that positive but not negative targets elicit social projection. Earlier research has attributed an effect of target valence to mere consistency principles of judgment and has, thus, questioned projection processes to be the origin of self-other similarity. Building on more recent evidence, we suggest that target valence influences self-other similarity above and beyond a consistent response behavior. The results of three experiments in which target valence was manipulated through evaluative conditioning and by smiling versus neutral facial expression support our hypothesis. We discuss how cognitive versus motivated processes can account for these findings and suggest a new conceptualization of social projection whereby projection is a means to regulate social distance. © 2014 by the Society for Personality and Social Psychology, Inc.

  6. DOE Office of Scientific and Technical Information (OSTI.GOV)

    O'Neil, D.J.; Colcord, A.R.; Bery, M.K.

    The objective of this project is to design, fabricate, and operate a fermentation facility which will demonstrate on a pilot-scale level (3 oven-dry tons (ODT) per day of feedstock) the economic and technical feasibility of producing anhydrous ethyl alcohol from lignocellulosic biomass residues (wood, corn stover, and wheat straw principally). The resultant process development unit (PDU) will be flexibly designed so as to evaluate current and projected unit operations, materials of construction, chemical and enzymatic systems which offer the potential of significant technological and economic breakthroughs in alcohol production from biomass. The principal focus of the project is to generatemore » fuels from biomass. As such, in addition to alcohol which can be used as a transportation fuel, by-products are to be directed where possible to fuel applications. The project consists of two parts: (1) conceptual design, and (2) detailed engineering design. The first quarter's activities have focused on a critical review of several aspects of the conceptual design of the 3 ODT/day PDU, viz.: (1) biomass cost, availability, and characterization; (2) pretreatment processes for lignocellulosic residues; (3) hydrolytic processes (enzymatic and acidic); (4) fermentation processes; (5) alcohol recovery systems; (6) by-product streams utilization; and (7) process economics.« less

  7. Simulation of generation of new ideas for new product development and IT services

    NASA Astrophysics Data System (ADS)

    Nasiopoulos, Dimitrios K.; Sakas, Damianos P.; Vlachos, D. S.; Mavrogianni, Amanda

    2015-02-01

    This paper describes a dynamic model of the New Product Development (NPD) process. The model has been occurring from best practice noticed in our research conducted at a range of situations. The model contributes to determine and put an IT company's NPD activities into the frame of the overall NPD process[1]. It has been found to be a useful tool for organizing data on IT company's NPD activities without enforcement an excessively restrictive research methodology refers to the model of NPD. The framework, which strengthens the model, will help to promote a research of the methods undertaken within an IT company's NPD process, thus promoting understanding and improvement of the simulation process[2]. IT companies tested many techniques with several different practices designed to improve the validity and efficacy of their NPD process[3]. Supported by the model, this research examines how widely accepted stated tactics are and what impact these best tactics have on NPD performance. The main assumption of this study is that simulation of generation of new ideas[4] will lead to greater NPD effectiveness and more successful products in IT companies. With the model implementation, practices concern the implementation strategies of NPD (product selection, objectives, leadership, marketing strategy and customer satisfaction) are all more widely accepted than best practices related with controlling the application of NPD (process control, measurements, results). In linking simulation with impact, our results states product success depends on developing strong products and ensuring organizational emphasis, through proper project selection. Project activities strengthens both product and project success. IT products and services success also depends on monitoring the NPD procedure through project management and ensuring team consistency with group rewards. Sharing experiences between projects can positively influence the NPD process.

  8. Using formative research to lay the foundation for community level HIV prevention efforts: an example from the AIDS Community Demonstration Projects.

    PubMed Central

    Higgins, D L; O'Reilly, K; Tashima, N; Crain, C; Beeker, C; Goldbaum, G; Elifson, C S; Galavotti, C; Guenther-Grey, C

    1996-01-01

    The AIDS Community Demonstration Projects provided community-level HIV prevention interventions to historically hard-to-reach groups at high risk for HIV infection. The projects operated under a common research protocol which encompassed formative research, intervention delivery, process evaluation, and outcome evaluation. A formative research process specifically focusing on intervention development was devised to assist project staff in identifying, prioritizing, accessing, and understanding the intervention target groups. This process was central to the creation of interventions that were acceptable and unique to the target populations. Intended to be rapid, the process took 6 months to complete. Drawn from the disciplines of anthropology, community psychology, sociology, and public health, the formative research process followed distinct steps which included (a) defining the populations at high-risk for HIV; (b) gathering information about these populations through interviews with persons who were outside of, but who had contact with, the target groups (such as staff from the health department and alcohol and drug treatment facilities, as well as persons who interacted in an informal manner with the target groups, such as clerks in neighborhood grocery stores and bartenders); (c) interviewing people with access to the target populations (gatekeepers), and conducting observations in areas where these high-risk groups were reported to gather (from previous interviews); (d) interviewing members of these groups at high risk for HIV infection or transmission; and (e) systematically integrating information throughout the process. Semistructured interview schedules were used for all data collection in this process. This standardized systematic method yielded valuable information about the focal groups in each demonstration project site. The method, if adopted by others, would assist community intervention specialists in developing interventions that are culturally appropriate and meaningful to their respective target populations. PMID:8862154

  9. Renewable Energy Development in Indian Country: A Handbook for Tribes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    MacCourt, D. C.

    2010-06-01

    This handbook is designed to be an accessible reference for those who are new to tribal energy project development or seek a refresher on key development issues as they navigate the project development process. It builds upon the wealth of feedback and experiences shared by tribal and other participants in the National Renewable Energy Laboratory's tribal energy training sessions to provide tribal leaders, tribal economic and energy enterprises, and those supporting them with a general overview of the renewable energy project development process as well as detailed guidance on the following: how to structure a renewable energy project transaction tomore » protect tribal interests, with an emphasis on joint project development efforts undertaken with nontribal parties; key energy development agreements, including power sale agreements, transmission and interconnection agreements, and land leases; and ways tribes can finance renewable energy projects, including the sources of funding or financing that may be available, the types of investors that may be available, and federal tax incentives for renewable energy projects.« less

  10. Software metrics: The key to quality software on the NCC project

    NASA Technical Reports Server (NTRS)

    Burns, Patricia J.

    1993-01-01

    Network Control Center (NCC) Project metrics are captured during the implementation and testing phases of the NCCDS software development lifecycle. The metrics data collection and reporting function has interfaces with all elements of the NCC project. Close collaboration with all project elements has resulted in the development of a defined and repeatable set of metrics processes. The resulting data are used to plan and monitor release activities on a weekly basis. The use of graphical outputs facilitates the interpretation of progress and status. The successful application of metrics throughout the NCC project has been instrumental in the delivery of quality software. The use of metrics on the NCC Project supports the needs of the technical and managerial staff. This paper describes the project, the functions supported by metrics, the data that are collected and reported, how the data are used, and the improvements in the quality of deliverable software since the metrics processes and products have been in use.

  11. Model for Simulating a Spiral Software-Development Process

    NASA Technical Reports Server (NTRS)

    Mizell, Carolyn; Curley, Charles; Nayak, Umanath

    2010-01-01

    A discrete-event simulation model, and a computer program that implements the model, have been developed as means of analyzing a spiral software-development process. This model can be tailored to specific development environments for use by software project managers in making quantitative cases for deciding among different software-development processes, courses of action, and cost estimates. A spiral process can be contrasted with a waterfall process, which is a traditional process that consists of a sequence of activities that include analysis of requirements, design, coding, testing, and support. A spiral process is an iterative process that can be regarded as a repeating modified waterfall process. Each iteration includes assessment of risk, analysis of requirements, design, coding, testing, delivery, and evaluation. A key difference between a spiral and a waterfall process is that a spiral process can accommodate changes in requirements at each iteration, whereas in a waterfall process, requirements are considered to be fixed from the beginning and, therefore, a waterfall process is not flexible enough for some projects, especially those in which requirements are not known at the beginning or may change during development. For a given project, a spiral process may cost more and take more time than does a waterfall process, but may better satisfy a customer's expectations and needs. Models for simulating various waterfall processes have been developed previously, but until now, there have been no models for simulating spiral processes. The present spiral-process-simulating model and the software that implements it were developed by extending a discrete-event simulation process model of the IEEE 12207 Software Development Process, which was built using commercially available software known as the Process Analysis Tradeoff Tool (PATT). Typical inputs to PATT models include industry-average values of product size (expressed as number of lines of code), productivity (number of lines of code per hour), and number of defects per source line of code. The user provides the number of resources, the overall percent of effort that should be allocated to each process step, and the number of desired staff members for each step. The output of PATT includes the size of the product, a measure of effort, a measure of rework effort, the duration of the entire process, and the numbers of injected, detected, and corrected defects as well as a number of other interesting features. In the development of the present model, steps were added to the IEEE 12207 waterfall process, and this model and its implementing software were made to run repeatedly through the sequence of steps, each repetition representing an iteration in a spiral process. Because the IEEE 12207 model is founded on a waterfall paradigm, it enables direct comparison of spiral and waterfall processes. The model can be used throughout a software-development project to analyze the project as more information becomes available. For instance, data from early iterations can be used as inputs to the model, and the model can be used to estimate the time and cost of carrying the project to completion.

  12. COTS/CRS: KSC Evolving Host Initiatives with Commercial Space Partners

    NASA Technical Reports Server (NTRS)

    Yohpe, Megan

    2010-01-01

    NASA's Commercial Crew and Cargo Program Office (C3PO) leads the agency's commercial efforts to stimulate United States private companies as the shuttle program comes to a close. Through the Commercial Orbital Transportation Services (COTS) program, two companies, SpaceX and Orbital, were selected to demonstrate their ability to perform flights to the International Space Station. The Commercial Resupply Services (CRS) Project leverages off the COTS experience, and awarded these two private companies contracts to resupply the International Space Station after shuttle fly out. As a 2010 summer intern, I supported the COTS/CRS team in their team meetings, attended and contributed to project discussions and planning, and assisted in developing visual representations for the variety of processes and organizational endeavors required for the program to run smoothly. One aspect of the COTS/CRS program gives the involved private companies the opportunity to request available services from Kennedy Space Center (KSC); one of my projects included assisting in the development of a related Task Order Request (TOR) process. In addition, an integral part of the project was to maintain and enhance the team database for processing the variety of TORS. My experience in the project gave me great insight into the growing field of commercial space activities. The development of the TOR process involved coordinating representatives from a variety of backgrounds at KSC. A clear and concise visual representation of the TOR process in the form of a flow chart was necessary to successfully implement a task order request from one of NASA's commercial partners. The goals of the process charts were to communicate the team's ideas and foster a common thought process while at the same time allow the process to grow and evolve. It was critical that the requests from the private companies were addressed quickly and thoroughly as the process developed this summer is expected to have extensive future use.

  13. Macroergonomic study of food sector company distribution centres.

    PubMed

    García Acosta, Gabriel; Lange Morales, Karen

    2008-07-01

    This study focussed on the work system design to be used by a Colombian food sector company for distributing products. It considered the concept of participative ergonomics, where people from the commercial, logistics, operation, occupational health areas worked in conjunction with the industrial designers, ergonomists who methodologically led the project. As a whole, the project was conceived as having five phases: outline, diagnosis, modelling the process, scalability, instrumentation. The results of the project translate into procedures for selecting, projecting a new distribution centre, the operational process model, a description of ergonomic systems that will enable specific work stations to be designed, the procedure for adapting existing warehouses. Strategically, this work helped optimise the company's processes and ensure that knowledge would be transferred within it. In turn, it became a primary prevention strategy in the field of health, aimed at reducing occupational risks, improving the quality of life at work.

  14. Low-cost solar array project progress and plans

    NASA Technical Reports Server (NTRS)

    Callaghan, W. T.

    1981-01-01

    The considered project is part of the DOE Photovoltaic Technology and Market Development Program. This program is concerned with the development and the utilization of cost-competitive photovoltaic systems. The project has the objective to develop, by 1986, the national capability to manufacture low-cost, long-life photovoltaic arrays at production rates that will realize economies of scale, and at a price of less than $0.70/watt. The array performance objectives include an efficiency greater than 10% and an operating lifetime longer than 20 years. The objective of the silicon material task is to establish the practicality of processes for producing silicon suitable for terrestrial photovoltaic applications at a price of $14/kg. The large-area sheet task is concerned with the development of process technology for sheet formation. Low-cost encapsulation material systems are being developed in connection with the encapsulation task. Another project goal is related to the development of economical process sequences.

  15. Meeting the challenge of policy-relevant science: lessons from a water resource project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lamb, B.L.

    Water resources scientists face complex tasks in evaluating aspects of water projects, but relatively few assessment procedures have been applied and accepted as standards applications. Decision-makers often rely on environmental assessments to evaluate the value and operation of projects. There is often confusion about scientists' role in policy decisions. The scientist can affect policy-making as an expert witness, an advocate or a surrogate. By understanding the policy process, scientists can make their work more policy relevant. Using the Terror Lake hydro project in Alaska as a guide, three lessons are discussed: (1) not all problems are able to be solvedmore » with technology; (2) policy-relevant technology is rarely imposed on a problem; and (3) the scientist need not just to react to the policy process, but can have an impact on how that process unfolds.« less

  16. The materials processing research base of the Materials Processing Center. Report for FY 1982

    NASA Technical Reports Server (NTRS)

    Flemings, M. C.

    1983-01-01

    The work described, while involving research in the broad field of materials processing, has two common features: the problems are closed related to space precessing of materials and have both practical and fundamental significance. An interesting and important feature of many of the projects is that the interdisciplinary nature of the problem mandates complementary analytical modeling/experimental approaches. An other important aspect of many of the projects is the increasing use of mathematical modeling techniques as one of the research tools. The predictive capability of these models, when tested against measurements, plays a very important role in both the planning of experimental programs and in the rational interpretation of the results. Many of the projects described have a space experiment as their ultimate objective. Mathematical models are proving to be extremely valuable in projecting the findings of ground - based experiments to microgravity conditions.

  17. Transitioning from Distributed and Traditional to Distributed and Agile: An Experience Report

    NASA Astrophysics Data System (ADS)

    Wildt, Daniel; Prikladnicki, Rafael

    Global companies that experienced extensive waterfall phased plans are trying to improve their existing processes to expedite team engagement. Agile methodologies have become an acceptable path to follow because it comprises project management as part of its practices. Agile practices have been used with the objective of simplifying project control through simple processes, easy to update documentation and higher team iteration over exhaustive documentation, focusing rather on team continuous improvement and aiming to add value to business processes. The purpose of this chapter is to describe the experience of a global multinational company on transitioning from distributed and traditional to distributed and agile. This company has development centers across North America, South America and Asia. This chapter covers challenges faced by the project teams of two pilot projects, including strengths of using agile practices in a globally distributed environment and practical recommendations for similar endeavors.

  18. Overview of the Integrated Programs for Aerospace Vehicle Design (IPAD) project

    NASA Technical Reports Server (NTRS)

    Venneri, S. L.

    1983-01-01

    To respond to national needs for improved productivity in engineering design and manufacturing, a NASA supported joint industry/government project is underway denoted Integrated Programs for Aerospace Vehicle Design (IPAD). The objective is to improve engineering productivity through better use of computer technology. It focuses on development of data base management technology and associated software for integrated company wide management of engineering and manufacturing information. Results to date on the IPAD project include an in depth documentation of a representative design process for a large engineering project, the definition and design of computer aided design software needed to support that process, and the release of prototype software to manage engineering information. This paper provides an overview of the IPAD project and summarizes progress to date and future plans.

  19. Process simulation for advanced composites production

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Allendorf, M.D.; Ferko, S.M.; Griffiths, S.

    1997-04-01

    The objective of this project is to improve the efficiency and lower the cost of chemical vapor deposition (CVD) processes used to manufacture advanced ceramics by providing the physical and chemical understanding necessary to optimize and control these processes. Project deliverables include: numerical process models; databases of thermodynamic and kinetic information related to the deposition process; and process sensors and software algorithms that can be used for process control. Target manufacturing techniques include CVD fiber coating technologies (used to deposit interfacial coatings on continuous fiber ceramic preforms), chemical vapor infiltration, thin-film deposition processes used in the glass industry, and coatingmore » techniques used to deposit wear-, abrasion-, and corrosion-resistant coatings for use in the pulp and paper, metals processing, and aluminum industries.« less

  20. Project Tradition and Technology (Project TNT): The Hualapai Bilingual Academic Excellence Program.

    ERIC Educational Resources Information Center

    Reed, Michael D.; And Others

    Project Tradition and Technology (TNT) at Peach Springs Elementary School (Peach Springs, Arizona) is 1 of 12 programs recognized nationally as an outstanding model of bilingual education by the U.S. Department of Education. Project TNT is a process-oriented curriculum development model that identifies the community's needs and expectations for…

Top