Sample records for underground power cables

  1. Assessment of 69 kV Underground Cable Thermal Ratings using Distributed Temperature Sensing

    NASA Astrophysics Data System (ADS)

    Stowers, Travis

    Underground transmission cables in power systems are less likely to experience electrical faults, however, resulting outage times are much greater in the event that a failure does occur. Unlike overhead lines, underground cables are not self-healing from flashover events. The faulted section must be located and repaired before the line can be put back into service. Since this will often require excavation of the underground duct bank, the procedure to repair the faulted section is both costly and time consuming. These added complications are the prime motivators for developing accurate and reliable ratings for underground cable circuits. This work will review the methods by which power ratings, or ampacity, for underground cables are determined and then evaluate those ratings by making comparison with measured data taken from an underground 69 kV cable, which is part of the Salt River Project (SRP) power subtransmission system. The process of acquiring, installing, and commissioning the temperature monitoring system is covered in detail as well. The collected data are also used to evaluate typical assumptions made when determining underground cable ratings such as cable hot-spot location and ambient temperatures. Analysis results show that the commonly made assumption that the deepest portion of an underground power cable installation will be the hot-spot location does not always hold true. It is shown that distributed cable temperature measurements can be used to locate the proper line segment to be used for cable ampacity calculations.

  2. 30 CFR 75.804 - Underground high-voltage cables.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Underground high-voltage cables. 75.804 Section... § 75.804 Underground high-voltage cables. (a) Underground high-voltage cables used in resistance grounded systems shall be equipped with metallic shields around each power conductor with one or more...

  3. 30 CFR 75.804 - Underground high-voltage cables.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Underground high-voltage cables. 75.804 Section... § 75.804 Underground high-voltage cables. (a) Underground high-voltage cables used in resistance grounded systems shall be equipped with metallic shields around each power conductor with one or more...

  4. 30 CFR 75.804 - Underground high-voltage cables.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Underground high-voltage cables. 75.804 Section... § 75.804 Underground high-voltage cables. (a) Underground high-voltage cables used in resistance grounded systems shall be equipped with metallic shields around each power conductor with one or more...

  5. Thermal analysis of underground power cable system

    NASA Astrophysics Data System (ADS)

    Rerak, Monika; Ocłoń, Paweł

    2017-10-01

    The paper presents the application of Finite Element Method in thermal analysis of underground power cable system. The computations were performed for power cables buried in-line in the ground at a depth of 2 meters. The developed mathematical model allows determining the two-dimensional temperature distribution in the soil, thermal backfill and power cables. The simulations studied the effect of soil and cable backfill thermal conductivity on the maximum temperature of the cable conductor. Also, the effect of cable diameter on the temperature of cable core was studied. Numerical analyses were performed based on a program written in MATLAB.

  6. 30 CFR 77.605 - Breaking trailing cable and power cable connections.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Breaking trailing cable and power cable... OF UNDERGROUND COAL MINES Trailing Cables § 77.605 Breaking trailing cable and power cable connections. Trailing cable and power cable connections between cables and to power sources shall not be made...

  7. 30 CFR 77.605 - Breaking trailing cable and power cable connections.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Breaking trailing cable and power cable... OF UNDERGROUND COAL MINES Trailing Cables § 77.605 Breaking trailing cable and power cable connections. Trailing cable and power cable connections between cables and to power sources shall not be made...

  8. 30 CFR 77.605 - Breaking trailing cable and power cable connections.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Breaking trailing cable and power cable... OF UNDERGROUND COAL MINES Trailing Cables § 77.605 Breaking trailing cable and power cable connections. Trailing cable and power cable connections between cables and to power sources shall not be made...

  9. 30 CFR 77.605 - Breaking trailing cable and power cable connections.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Breaking trailing cable and power cable... OF UNDERGROUND COAL MINES Trailing Cables § 77.605 Breaking trailing cable and power cable connections. Trailing cable and power cable connections between cables and to power sources shall not be made...

  10. 30 CFR 77.605 - Breaking trailing cable and power cable connections.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Breaking trailing cable and power cable... OF UNDERGROUND COAL MINES Trailing Cables § 77.605 Breaking trailing cable and power cable connections. Trailing cable and power cable connections between cables and to power sources shall not be made...

  11. 30 CFR 57.12014 - Handling energized power cables.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Handling energized power cables. 57.12014... Electricity Surface and Underground § 57.12014 Handling energized power cables. Power cables energized to.... This does not prohibit pulling or dragging of cable by the equipment it powers when the cable is...

  12. 30 CFR 57.12014 - Handling energized power cables.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Handling energized power cables. 57.12014... Electricity Surface and Underground § 57.12014 Handling energized power cables. Power cables energized to.... This does not prohibit pulling or dragging of cable by the equipment it powers when the cable is...

  13. 30 CFR 57.12014 - Handling energized power cables.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Handling energized power cables. 57.12014... Electricity Surface and Underground § 57.12014 Handling energized power cables. Power cables energized to.... This does not prohibit pulling or dragging of cable by the equipment it powers when the cable is...

  14. 30 CFR 57.12014 - Handling energized power cables.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Handling energized power cables. 57.12014... Electricity Surface and Underground § 57.12014 Handling energized power cables. Power cables energized to.... This does not prohibit pulling or dragging of cable by the equipment it powers when the cable is...

  15. 30 CFR 57.12014 - Handling energized power cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Handling energized power cables. 57.12014... Electricity Surface and Underground § 57.12014 Handling energized power cables. Power cables energized to.... This does not prohibit pulling or dragging of cable by the equipment it powers when the cable is...

  16. 30 CFR 75.607 - Breaking trailing cable and power cable connections.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Breaking trailing cable and power cable... LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trailing Cables § 75.607 Breaking trailing cable and power cable connections. [Statutory Provisions] Trailing cable and...

  17. Life cycle assessment of overhead and underground primary power distribution.

    PubMed

    Bumby, Sarah; Druzhinina, Ekaterina; Feraldi, Rebe; Werthmann, Danae; Geyer, Roland; Sahl, Jack

    2010-07-15

    Electrical power can be distributed in overhead or underground systems, both of which generate a variety of environmental impacts at all stages of their life cycles. While there is considerable literature discussing the trade-offs between both systems in terms of aesthetics, safety, cost, and reliability, environmental assessments are relatively rare and limited to power cable production and end-of-life management. This paper assesses environmental impacts from overhead and underground medium voltage power distribution systems as they are currently built and managed by Southern California Edison (SCE). It uses process-based life cycle assessment (LCA) according to ISO 14044 (2006) and SCE-specific primary data to the extent possible. Potential environmental impacts have been calculated using a wide range of midpoint indicators, and robustness of the results has been investigated through sensitivity analysis of the most uncertain and potentially significant parameters. The studied underground system has higher environmental impacts in all indicators and for all parameter values, mostly due to its higher material intensity. For both systems and all indicators the majority of impact occurs during cable production. Promising strategies for impact reduction are thus cable failure rate reduction for overhead and cable lifetime extension for underground systems.

  18. 30 CFR 57.12013 - Splices and repairs of power cables.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Splices and repairs of power cables. 57.12013... Electricity Surface and Underground § 57.12013 Splices and repairs of power cables. Permanent splices and repairs made in power cables, including the ground conductor where provided, shall be— (a) Mechanically...

  19. 30 CFR 57.12013 - Splices and repairs of power cables.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Splices and repairs of power cables. 57.12013... Electricity Surface and Underground § 57.12013 Splices and repairs of power cables. Permanent splices and repairs made in power cables, including the ground conductor where provided, shall be— (a) Mechanically...

  20. 30 CFR 57.12013 - Splices and repairs of power cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Splices and repairs of power cables. 57.12013... Electricity Surface and Underground § 57.12013 Splices and repairs of power cables. Permanent splices and repairs made in power cables, including the ground conductor where provided, shall be— (a) Mechanically...

  1. 30 CFR 57.12013 - Splices and repairs of power cables.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Splices and repairs of power cables. 57.12013... Electricity Surface and Underground § 57.12013 Splices and repairs of power cables. Permanent splices and repairs made in power cables, including the ground conductor where provided, shall be— (a) Mechanically...

  2. 30 CFR 57.12013 - Splices and repairs of power cables.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Splices and repairs of power cables. 57.12013... Electricity Surface and Underground § 57.12013 Splices and repairs of power cables. Permanent splices and repairs made in power cables, including the ground conductor where provided, shall be— (a) Mechanically...

  3. 30 CFR 57.12083 - Support of power cables in shafts and boreholes.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Support of power cables in shafts and boreholes... NONMETAL MINES Electricity Underground Only § 57.12083 Support of power cables in shafts and boreholes. Power cables in shafts and boreholes shall be fastened securely in such a manner as to prevent undue...

  4. 30 CFR 57.12083 - Support of power cables in shafts and boreholes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Support of power cables in shafts and boreholes... NONMETAL MINES Electricity Underground Only § 57.12083 Support of power cables in shafts and boreholes. Power cables in shafts and boreholes shall be fastened securely in such a manner as to prevent undue...

  5. 30 CFR 57.12083 - Support of power cables in shafts and boreholes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Support of power cables in shafts and boreholes... NONMETAL MINES Electricity Underground Only § 57.12083 Support of power cables in shafts and boreholes. Power cables in shafts and boreholes shall be fastened securely in such a manner as to prevent undue...

  6. 30 CFR 57.12083 - Support of power cables in shafts and boreholes.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Support of power cables in shafts and boreholes... NONMETAL MINES Electricity Underground Only § 57.12083 Support of power cables in shafts and boreholes. Power cables in shafts and boreholes shall be fastened securely in such a manner as to prevent undue...

  7. 30 CFR 57.12083 - Support of power cables in shafts and boreholes.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Support of power cables in shafts and boreholes... NONMETAL MINES Electricity Underground Only § 57.12083 Support of power cables in shafts and boreholes. Power cables in shafts and boreholes shall be fastened securely in such a manner as to prevent undue...

  8. High Voltage Power Transmission for Wind Energy

    NASA Astrophysics Data System (ADS)

    Kim, Young il

    The high wind speeds and wide available area at sea have recently increased the interests on offshore wind farms in the U.S.A. As offshore wind farms become larger and are placed further from the shore, the power transmission to the onshore grid becomes a key feature. Power transmission of the offshore wind farm, in which good wind conditions and a larger installation area than an onshore site are available, requires the use of submarine cable systems. Therefore, an underground power cable system requires unique design and installation challenges not found in the overhead power cable environment. This paper presents analysis about the benefit and drawbacks of three different transmission solutions: HVAC, LCC/VSC HVDC in the grid connecting offshore wind farms and also analyzed the electrical characteristics of underground cables. In particular, loss of HV (High Voltage) subsea power of the transmission cables was evaluated by the Brakelmann's theory, taking into account the distributions of current and temperature.

  9. 30 CFR 57.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Insulation and fittings for power wires and... NONMETAL MINES Electricity Surface and Underground § 57.12008 Insulation and fittings for power wires and cables. Power wires and cables shall be insulated adequately where they pass into or out of electrical...

  10. 30 CFR 57.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Insulation and fittings for power wires and... NONMETAL MINES Electricity Surface and Underground § 57.12008 Insulation and fittings for power wires and cables. Power wires and cables shall be insulated adequately where they pass into or out of electrical...

  11. Properties of plastic tapes for cryogenic power cable insulation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muller, A C

    1978-01-01

    A superconducting ac power transmission cable is under development at Brookhaven National Laboratory (BNL). This project was undertaken in 1972 in response to growing national power requirements. The goal of this program is to develop an underground power transmission system suitable for transferring bulk quantities of electricity over distances of 16 to 160 km. Both the capital investment and operating costs must be low enough to make the system attractive to the electric utilities. The superconducting cable shares the advantages with conventional underground cables of needing only a few feet of right-of-way width rather than the large tracts of increasinglymore » expensive land required for conventional aerial transmission. Recent cost analysis studies show that superconducting cables, although more expensive than aerial transmission, will probably be competitive with other methods of underground transmission at loads greater than 2000 MVA. Initial design studies showed that a flexible, forced-cooled cable offered the best combination of technical and economic features. A helium cooled cable with Nb/sub 3/Sn superconductor was chosen as the BNL design. The present goal of the BNL program is the construction of a 100 meter outdoor three-phase ac cable rated at 138 kV and 1000 MVA. The refrigerator and the 100 m-long dewar are already installed. Terminations and cables are under design, and it is planned to begin installation of the first single phase cable in 1979. If the results on this model show promise for eventual commercial use, cables of higher voltage and power rating will be developed. One fundamental phase of this project; the development of the required insulating materials, is described.« less

  12. Automation of Underground Cable Laying Equipment Using PLC and Hmi

    NASA Astrophysics Data System (ADS)

    Mal Kothari, Kesar; Samba, Vishweshwar; Tania, Kinza; Udayakumar, R., Dr; Karthikeyan, Ram, Dr

    2018-04-01

    Underground cable laying is an alternative for overhead cable laying of telecommunication and power transmission lines. It is becoming very popular in recent times because of some of its advantages over overhead cable laying. This type of cable laying is mostly practiced in developed countries because it is more expensive than overhead cable laying. Underground cable laying is more suitable when land is not available, and it also increases the aesthetics. This paper implements the automation on a manually operated cable pulling winch machine using programmable logic controller (PLC). Winch machines are useful in underground cable laying. The main aim of the project is to replace all the mechanical functions with electrical controls which are operated through a touch screen (HMI). The idea is that the machine should shift between parallel and series circuit automatically based on the pressure sensed instead of manually operating the solenoid valve. Traditional means of throttling the engine using lever and wire is replaced with a linear actuator. Sensors such as proximity, pressure and load sensor are used to provide the input to the system. The HMI used will display the speed, length and tension of the rope being winded. Ladder logic is used to program the PLC.

  13. 30 CFR 75.516 - Power wires; support.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical Equipment-General § 75.516 Power wires; support. [Statutory Provision] All power wires (except trailing cables on mobile equipment, specially designed cables... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Power wires; support. 75.516 Section 75.516...

  14. 30 CFR 75.516 - Power wires; support.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical Equipment-General § 75.516 Power wires; support. [Statutory Provision] All power wires (except trailing cables on mobile equipment, specially designed cables... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Power wires; support. 75.516 Section 75.516...

  15. 30 CFR 75.516 - Power wires; support.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical Equipment-General § 75.516 Power wires; support. [Statutory Provision] All power wires (except trailing cables on mobile equipment, specially designed cables... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Power wires; support. 75.516 Section 75.516...

  16. 30 CFR 75.516 - Power wires; support.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Power wires; support. 75.516 Section 75.516... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical Equipment-General § 75.516 Power wires; support. [Statutory Provision] All power wires (except trailing cables on mobile equipment, specially designed cables...

  17. 30 CFR 75.516 - Power wires; support.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Power wires; support. 75.516 Section 75.516... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Electrical Equipment-General § 75.516 Power wires; support. [Statutory Provision] All power wires (except trailing cables on mobile equipment, specially designed cables...

  18. 30 CFR 77.600 - Trailing cables; short-circuit protection; disconnecting devices.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... capacity in each ungrounded conductor. Disconnecting devices used to disconnect power from trailing cables... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Trailing cables; short-circuit protection... AREAS OF UNDERGROUND COAL MINES Trailing Cables § 77.600 Trailing cables; short-circuit protection...

  19. 30 CFR 77.600 - Trailing cables; short-circuit protection; disconnecting devices.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... capacity in each ungrounded conductor. Disconnecting devices used to disconnect power from trailing cables... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Trailing cables; short-circuit protection... AREAS OF UNDERGROUND COAL MINES Trailing Cables § 77.600 Trailing cables; short-circuit protection...

  20. 30 CFR 77.600 - Trailing cables; short-circuit protection; disconnecting devices.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... capacity in each ungrounded conductor. Disconnecting devices used to disconnect power from trailing cables... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Trailing cables; short-circuit protection... AREAS OF UNDERGROUND COAL MINES Trailing Cables § 77.600 Trailing cables; short-circuit protection...

  1. 30 CFR 77.600 - Trailing cables; short-circuit protection; disconnecting devices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... capacity in each ungrounded conductor. Disconnecting devices used to disconnect power from trailing cables... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Trailing cables; short-circuit protection... AREAS OF UNDERGROUND COAL MINES Trailing Cables § 77.600 Trailing cables; short-circuit protection...

  2. 30 CFR 57.12088 - Splicing trailing cables.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... cable reel or other power feed cable payout-retrieval system. However, a temporary splice may be made to... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Splicing trailing cables. 57.12088 Section 57... Underground Only § 57.12088 Splicing trailing cables. No splice, except a vulcanized splice or its equivalent...

  3. 30 CFR 57.12088 - Splicing trailing cables.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... cable reel or other power feed cable payout-retrieval system. However, a temporary splice may be made to... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Splicing trailing cables. 57.12088 Section 57... Underground Only § 57.12088 Splicing trailing cables. No splice, except a vulcanized splice or its equivalent...

  4. 30 CFR 57.12088 - Splicing trailing cables.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... cable reel or other power feed cable payout-retrieval system. However, a temporary splice may be made to... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Splicing trailing cables. 57.12088 Section 57... Underground Only § 57.12088 Splicing trailing cables. No splice, except a vulcanized splice or its equivalent...

  5. 30 CFR 57.12088 - Splicing trailing cables.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... cable reel or other power feed cable payout-retrieval system. However, a temporary splice may be made to... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Splicing trailing cables. 57.12088 Section 57... Underground Only § 57.12088 Splicing trailing cables. No splice, except a vulcanized splice or its equivalent...

  6. 30 CFR 75.601 - Short circuit protection of trailing cables.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... to disconnect power from trailing cables shall be plainly marked and identified and such devices... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Short circuit protection of trailing cables. 75... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trailing Cables § 75.601 Short...

  7. 30 CFR 75.601 - Short circuit protection of trailing cables.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... to disconnect power from trailing cables shall be plainly marked and identified and such devices... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Short circuit protection of trailing cables. 75... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trailing Cables § 75.601 Short...

  8. 30 CFR 75.601 - Short circuit protection of trailing cables.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... to disconnect power from trailing cables shall be plainly marked and identified and such devices... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Short circuit protection of trailing cables. 75... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trailing Cables § 75.601 Short...

  9. 30 CFR 75.601 - Short circuit protection of trailing cables.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... to disconnect power from trailing cables shall be plainly marked and identified and such devices... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Short circuit protection of trailing cables. 75... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trailing Cables § 75.601 Short...

  10. Review of fire test methods and incident data for portable electric cables in underground coal mines

    NASA Astrophysics Data System (ADS)

    Braun, E.

    1981-06-01

    Electrically powered underground coal mining machinery is connected to a load center or distribution box by electric cables. The connecting cables used on mobile machines are required to meet fire performance requirements defined in the Code of Federal Regulations. This report reviews Mine Safety and Health Administration's (MSHA) current test method and compares it to British practices. Incident data for fires caused by trailing cable failures and splice failures were also reviewed. It was found that the MSHA test method is more severe than the British but that neither evaluated grouped cable fire performance. The incident data indicated that the grouped configuration of cables on a reel accounted for a majority of the fires since 1970.

  11. An Insight on Right of Way and its Cost for Power Transmission Cable and Conventional Overhead Transmission Lines

    NASA Astrophysics Data System (ADS)

    Khandelwal, P.; Pachori, A.; Khandelwal, T.

    2013-12-01

    This paper provides the complete information related to Right of Way (RoW) for the construction of new power transmission line (TL) in terms of present cost for overhead transmission line and underground XLPE transmission cable. The former part of the paper describes the general procedure and rules for acquisition of land for RoW by transmission asset owner (TAO) while in the later part the cost associated to acquire RoW and its impact on the cost of adjacent land have been detailed. It also discusses the actual dismantling cost including the cost of waste metal what TAO get after completion of lifecycle of TL due to increase in metal prices. In this paper cost of RoW after completion of lifecycle of TL is also highlighted. This paper compares the cost of RoW for overhead transmission line and underground XLPE transmission cable for construction of new TL. Also for old transmission infrastructure cost of RoW for change from overhead transmission line to underground XLPE transmission cable is detailed by application of replacement model.

  12. Development of a single-phase 30 m HTS power cable

    NASA Astrophysics Data System (ADS)

    Cho, Jeonwook; Bae, Joon-Han; Kim, Hae-Jong; Sim, Ki-Deok; Kim, Seokho; Jang, Hyun-Man; Lee, Chang-Young; Kim, Dong-Wook

    2006-05-01

    HTS power transmission cables appear to be the replacement and retrofitting of underground cables in urban areas and HTS power transmission cable offers a number of technical and economic merits compared to the normal conductor cable system. A 30 m long, single-phase 22.9 kV class HTS power transmission cable system has been developed by Korea Electrotechnology Research Institute (KERI), LS Cable Ltd., and Korea Institute of Machinery and Materials (KIMM), which is one of the 21st century frontier project in Korea since 2001. The HTS power cable has been developed, cooled down and tested to obtain realistic thermal and electrical data on HTS power cable system. The evaluation results clarified such good performance of HTS cable that DC critical current of the HTS cable was 3.6 kA and AC loss was 0.98 W/m at 1260 Arms and shield current was 1000 Arms. These results proved the basic properties for 22.9 kV HTS power cable. As a next step, we have been developing a 30 m, three-phase 22.9 kV, 50 MV A HTS power cable system and long term evaluation is in progress now.

  13. 77 FR 19525 - Specification for 15 kV and 25 kV Primary Underground Power Cable

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-02

    ... has revised the final rule. Comment: Conductor Shield, NRECA T&D suggested adding (for discharge... be 3 through 18 pounds (1.36 through 8.16 kg) for EPR discharge free and TR-XLPE cables. Discharge....16 kg) for EPR discharge free and TR-XLPE cables. Discharge resistant cables shall have strip tension...

  14. 30 CFR 77.805 - Cable couplers and connection boxes; minimum design requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Cable couplers and connection boxes; minimum... WORK AREAS OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.805 Cable couplers and connection boxes; minimum design requirements. (a)(1) Couplers that are used in medium- or high-voltage power...

  15. 30 CFR 77.805 - Cable couplers and connection boxes; minimum design requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Cable couplers and connection boxes; minimum... WORK AREAS OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.805 Cable couplers and connection boxes; minimum design requirements. (a)(1) Couplers that are used in medium- or high-voltage power...

  16. 30 CFR 77.805 - Cable couplers and connection boxes; minimum design requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Cable couplers and connection boxes; minimum... WORK AREAS OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.805 Cable couplers and connection boxes; minimum design requirements. (a)(1) Couplers that are used in medium- or high-voltage power...

  17. Superconducting power transmission system development. Cable insulation development

    NASA Astrophysics Data System (ADS)

    1983-09-01

    The development of an underground superconducting power transmission system which is economical and technically attractive to the utility industry is discussed. Suitable superconductors and dielectric insulation were developed. Cables several hundred feet long are tested under realistic conditions. Three operating runs of about 2 weeks duration each were accomplished. The 60 Hz steady state performance of the cables under rated conditions was explored. Over voltage endurance tests and emergency level current tests were performed.

  18. Optimization Research on Ampacity of Underground High Voltage Cable Based on Interior Point Method

    NASA Astrophysics Data System (ADS)

    Huang, Feng; Li, Jing

    2017-12-01

    The conservative operation method which takes unified current-carrying capacity as maximum load current can’t make full use of the overall power transmission capacity of the cable. It’s not the optimal operation state for the cable cluster. In order to improve the transmission capacity of underground cables in cluster, this paper regards the maximum overall load current as the objective function and the temperature of any cables lower than maximum permissible temperature as constraint condition. The interior point method which is very effective for nonlinear problem is put forward to solve the extreme value of the problem and determine the optimal operating current of each loop. The results show that the optimal solutions obtained with the purposed method is able to increase the total load current about 5%. It greatly improves the economic performance of the cable cluster.

  19. 30 CFR 57.4057 - Underground trailing cables.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... and Control § 57.4057 Underground trailing cables. Underground trailing cables shall be accepted or... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Underground trailing cables. 57.4057 Section 57.4057 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL...

  20. 30 CFR 57.4057 - Underground trailing cables.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... and Control § 57.4057 Underground trailing cables. Underground trailing cables shall be accepted or... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Underground trailing cables. 57.4057 Section 57.4057 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL...

  1. 30 CFR 57.4057 - Underground trailing cables.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... and Control § 57.4057 Underground trailing cables. Underground trailing cables shall be accepted or... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Underground trailing cables. 57.4057 Section 57.4057 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL...

  2. 30 CFR 57.4057 - Underground trailing cables.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... and Control § 57.4057 Underground trailing cables. Underground trailing cables shall be accepted or... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Underground trailing cables. 57.4057 Section 57.4057 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL...

  3. Development of Integrated Assessment System for Underground Power Cable Performance: A Case Study

    NASA Astrophysics Data System (ADS)

    Turan, Faiz Mohd; Johan, Kartina; Soliha Sahimi, Nur; Nor, Nik Hisyamudin Muhd

    2017-08-01

    The basic operation of any electrical machines that is catered to serve needs of civilization involves electrical power which is the main source to trigger the internal mechanism in the machines then transfer the power to other form of energy such as mechanical, light, sound and etc. The supplies of electrical does not happen just by providing the source itself, it has load carrying agent which in many cases, user would refer to it as cable. Specifically, it is the power cable which its ampacity depends significantly on the operation temperature and load stress on it. Apart from having to focus on providing improvement on improving efficiency on the source itself, power cable plays and important role because without it, current ranging from low to high could not be transmitted and hence a failure of the power system generally. Studies have conducted to discuss whether which factor contributes relatively more to the causes of power cable failure or breakdown. Such factors can be narrowed down to the three major causes which are over temperature, over voltage and stress caused by over current. Over current is one of the factor which is depends on the usage of the power system itself. The higher the usage of the power system, higher the chances of over current to take place. This will then produce load stress on the cable which eventually destroy the insulator of the cable and slowly reach the core of the cable. It is believed that an assessment method should be implemented in order to predict the performance and failure rate of the power cable and use this prediction as reference rather than just letting power failure to happen anytime unpredictable which cause huge inconvenience to users and industries. Not only do a method should be implemented, it should be as easy to be used and understood by large range of users and integrated by a graphical user interface to be used. Therefore, this research will further narrow down on the approaches to do so and the location of studies involve Company M which is an agriculture industries which has higher usage on their own underground power cable. Moreover, in the past history the company experienced electrical power failure and this studies and findings will definitely come in hand to provide them necessary help and benefits.

  4. Applying Diagnostics to Enhance Cable System Reliability (Cable Diagnostic Focused Initiative, Phase II)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hartlein, Rick; Hampton, Nigel; Perkel, Josh

    2016-02-01

    The Cable Diagnostic Focused Initiative (CDFI) played a significant and powerful role in clarifying the concerns and understanding the benefits of performing diagnostic tests on underground power cable systems. This project focused on the medium and high voltage cable systems used in utility transmission and distribution (T&D) systems. While many of the analysis techniques and interpretations are applicable to diagnostics and cable systems outside of T&D, areas such as generating stations (nuclear, coal, wind, etc.) and other industrial environments were not the focus. Many large utilities in North America now deploy diagnostics or have changed their diagnostic testing approach asmore » a result of this project. Previous to the CDFI, different diagnostic technology providers individually promoted their approach as the “the best” or “the only” means of detecting cable system defects.« less

  5. Assessing the effects of underground mining activities on high-voltage overhead power lines

    NASA Astrophysics Data System (ADS)

    Gusev, Vladimir; Zhuravlyov, Alexei; Maliukhina, Elena

    2017-11-01

    This paper introduces a technique for predictive assessment of changes in the position of power transmission towers and condition of overhead power lines, located in the zone of influence of displacements and deformations of the Earth's surface caused by mining activities. A special approach for monitoring the technical condition of towers and cables is proposed. It is intended to address the issue of controlling the condition of transmission lines that are under the influence of underground mining activities and to checkmate such impact.

  6. Effect of the surface roughness on interfacial breakdown between two dielectric surfaces

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fournier, D.

    1996-12-31

    Cable splices and accessories are the weak link in an underground power distribution system. Investigations of problems related to cable splices and accessories becomes quite intricate once the simpler causes of failures are dismissed to allow more complex phenomena to be examined. The interfacial breakdown between two internal dielectric surfaces represents one of the major causes of failure for power cable joints. In order to better understand this phenomenon, breakdown experiments were performed at interfaces found in cable splices. An experimental jig was designed to induce breakdown between dielectric surfaces longitudinally along their interface. Effects of surface roughness at EPDM/XLPEmore » and EPDM/EPDM interfaces as well as the presence of silicone grease are taken into account.« less

  7. Designing Predictive Diagnose Method for Insulation Resistance Degradation of the Electrical Power Cables from Neutral Insulated Power Networks

    NASA Astrophysics Data System (ADS)

    Dobra, R.; Pasculescu, D.; Risteiu, M.; Buica, G.; Jevremović, V.

    2017-06-01

    This paper describe some possibilities to minimize voltages switching-off risks from the mining power networks, in case of insulated resistance faults by using a predictive diagnose method. The cables from the neutral insulated power networks (underground mining) are designed to provide a flexible electrical connection between portable or mobile equipment and a point of supply, including main feeder cable for continuous miners, pump cable, and power supply cable. An electronic protection for insulated resistance of mining power cables can be made using this predictive strategy. The main role of electronic relays for insulation resistance degradation of the electrical power cables, from neutral insulated power networks, is to provide a permanent measurement of the insulated resistance between phases and ground, in order to switch-off voltage when the resistance value is below a standard value. The automat system of protection is able to signalize the failure and the human operator will be early informed about the switch-off power and will have time to take proper measures to fix the failure. This logic for fast and automat switch-off voltage without aprioristic announcement is suitable for the electrical installations, realizing so a protection against fires and explosion. It is presented an algorithm and an anticipative relay for insulated resistance control from three-phase low voltage installations with insulated neutral connection.

  8. Fiber optic cables for severe environment

    NASA Astrophysics Data System (ADS)

    Massarani, M. G.

    1982-10-01

    The most severe challenges to the fiber optic cable are related to nuclear weapons testing and other military applications. Nuclear experiments are conducted in deep underground holes. Cables connect the experimental device to recording stations positioned at a certain distance from ground zero. Attractive features provided by fiber optic cable technology include large cost advantages in cable purchase price, savings in handling cost due to the lighter weight, immunity to electromagnetic pulses (EMP), and the capability to transmit high data rates. Details of underground nuclear testing are discussed, taking into account the underground nuclear test environment, and questions of fiber optic cable design for the underground experiments. The use of fiber optics for the Ground Launched Cruise Missile Weapons System (GLCM) is also considered. Attention is given to the GLCM environment, and the proposed cable for GLCM application.

  9. 27. View of 500,000 volt spreading yard that transfers power ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    27. View of 500,000 volt spreading yard that transfers power from underground cable, from Third Powerhouse, to overhead line; the towers are pipe-type transformer towers. Looking west. - Columbia Basin Project, Grand Coulee Dam Powerplant Complex, Grand Coulee, Grant County, WA

  10. 30 CFR 75.816 - Guarding of cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Underground High-Voltage Distribution High-Voltage Longwalls § 75.816 Guarding of cables. (a) High-voltage cables must be guarded at the following locations...

  11. Fiber-optic security monitoring sensor

    NASA Astrophysics Data System (ADS)

    Englund, Marja; Ipatti, Ari; Karioja, Pentti

    1997-09-01

    In security monitoring, fiber-optic sensors are advantageous because strong and rugged optical fibers are thin, light, flexible and immune to electromagnetic interference. Optical fibers packaged into cables, such as, building and underground cables, can be used to detect even slightest disturbances, movements, vibrations, pressure changes and impacts along their entire length. When running an optical cable around a structure, and when using speckle pattern recognition technique for alarm monitoring, the distributed monitoring of the structure is possible. The sensing cable can be strung along fences, buried underground, embedded into concrete, mounted on walls, floors and ceilings, or wrapped around the specific components. In this paper, a fiber-optic security monitoring sensor based on speckle pattern monitoring is described. The description of the measuring method and the results of the experimental fiber installations are given. The applicability of embedded and surface mounted fibers to monitor the pressure and impact induced vibrations of fences and concrete structures as well as the loosening of critical parts in a power plant machinery were demonstrated in field and laboratory conditions. The experiences related to the applications and optical cable types are also discussed.

  12. Fiber optic security monitoring sensor

    NASA Astrophysics Data System (ADS)

    Englund, Marja; Ipatti, Ari; Karioja, Pentti

    1997-09-01

    In security monitoring, fiber-optic sensors are advantageous because strong and rugged optical fibers are thin, light, flexible and immune to electromagnetic interference. Optical fibers packaged into cables, such as, building and underground cables, can be used to detect even slightest disturbances, movements, vibrations, pressure changes and impacts along their entire length. When running an optical cable around a structure, and when using speckle pattern recognition technique for alarm monitoring, the distributed monitoring of the structure is possible. The sensing cable can be strung along fences, buried underground, embedded into concrete, mounted on walls, floors and ceilings, or wrapped around the specific components. In this paper, a fiber-optic security monitoring sensor based on speckle pattern monitoring is described. The description of the measuring method and the results of the experimental fiber installations are given. The applicability of embedded and surface mounted fibers to monitor the pressure and impact induced vibrations of fences and concrete structures as well as the loosening of critical parts in a power plant machinery were demonstrated in field and laboratory conditions. The experiences related to the applications and optical cable types are also discussed.

  13. 12. Credit BG. Typical view down one of the underground ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Credit BG. Typical view down one of the underground tunnels connecting the Control and Recording Center with all the JPL Edwards Facility test stands. In addition to personnel traffic, the tunnel system carried electrical power cables, instrumentation and control circuits, and high pressure helium and nitrogen lines. - Jet Propulsion Laboratory Edwards Facility, Control & Recording Center, Edwards Air Force Base, Boron, Kern County, CA

  14. 30 CFR 75.817 - Cable handling and support systems.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Underground High-Voltage Distribution High-Voltage Longwalls § 75.817 Cable handling and support systems. Longwall mining equipment must be... the possibility of miners contacting the cables and to protect the high-voltage cables from damage. ...

  15. HTS Transmission Cable System for installation in the Long Island Power Grid

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schmidt, Frank; Durand, Fabien; Maguire, James

    2015-10-05

    Department of Energy (DOE) Award DE-FC26-07NT43240 was issued on October 1, 2007. Referred to as LIPA2, the principal objectives of the project were to develop key components required to deploy and demonstrate second-generation (2G) high temperature superconductor (HTS) cables in a 600 meter (2000 feet) underground segment of a 138kV three-phase transmission circuit of the Long Island Power Authority (LIPA) power grid. A previous effort under DOE Award DE-FC36-03GO13032 (referred to as LIPA1) resulted in installation (and subsequent successful operation) of first-generation (1G) HTS cables at the LIPA site. As with LIPA1, American Superconductor (AMSC) led the effort for LIPA2more » and was responsible for overall management of the project and producing sufficient 2G wire to fabricate the required cable. Nexans' tasks included design/manufacture/installation of the cable, joint (splice), cable terminations and field repairable cryostat; while work by Air Liquide involved engineering and installation support for the refrigeration system modifications.« less

  16. 30 CFR 75.804 - Underground high-voltage cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... grounded systems shall be equipped with metallic shields around each power conductor with one or more ground conductors having a total cross sectional area of not less than one-half the power conductor, and with an insulated external conductor not smaller than No. 8 (A.W.G.) or an insulated internal ground...

  17. 30 CFR 75.804 - Underground high-voltage cables.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... grounded systems shall be equipped with metallic shields around each power conductor with one or more ground conductors having a total cross sectional area of not less than one-half the power conductor, and with an insulated external conductor not smaller than No. 8 (A.W.G.) or an insulated internal ground...

  18. 30 CFR 57.12027 - Grounding mobile equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Grounding mobile equipment. 57.12027 Section 57... Surface and Underground § 57.12027 Grounding mobile equipment. Frame grounding or equivalent protection shall be provided for mobile equipment powered through trailing cables. ...

  19. 30 CFR 57.4057 - Underground trailing cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground trailing cables. 57.4057 Section 57.4057 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Fire Prevention...

  20. Protective and control relays as coal-mine power-supply ACS subsystem

    NASA Astrophysics Data System (ADS)

    Kostin, V. N.; Minakova, T. E.

    2017-10-01

    The paper presents instantaneous selective short-circuit protection for the cabling of the underground part of a coal mine and central control algorithms as a Coal-Mine Power-Supply ACS Subsystem. In order to improve the reliability of electricity supply and reduce the mining equipment down-time, a dual channel relay protection and central control system is proposed as a subsystem of the coal-mine power-supply automated control system (PS ACS).

  1. 47 CFR 32.2422 - Underground cable.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... cable. This subsidiary record category shall include the original cost of optical fiber cable and other..., Buried Cable. (d) The cost of cables leading from the main distributing frame or equivalent to central...

  2. 47 CFR 32.2422 - Underground cable.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... cable. This subsidiary record category shall include the original cost of optical fiber cable and other..., Buried Cable. (d) The cost of cables leading from the main distributing frame or equivalent to central...

  3. 47 CFR 32.2422 - Underground cable.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... cable. This subsidiary record category shall include the original cost of optical fiber cable and other..., Buried Cable. (d) The cost of cables leading from the main distributing frame or equivalent to central...

  4. 47 CFR 32.2422 - Underground cable.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... cable. This subsidiary record category shall include the original cost of optical fiber cable and other..., Buried Cable. (d) The cost of cables leading from the main distributing frame or equivalent to central...

  5. 47 CFR 32.2422 - Underground cable.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... cable. This subsidiary record category shall include the original cost of optical fiber cable and other..., Buried Cable. (d) The cost of cables leading from the main distributing frame or equivalent to central...

  6. Comparison of Distributed Acoustic Sensing (DAS) from Fiber-Optic Cable to Three Component Geophones in an Underground Mine

    NASA Astrophysics Data System (ADS)

    Speece, M. A.; Nesladek, N. J.; Kammerer, C.; Maclaughlin, M.; Wang, H. F.; Lord, N. E.

    2017-12-01

    We conducted experiments in the Underground Education Mining Center on the Montana Tech campus, Butte, Montana, to make a direct comparison between Digital Acoustic Sensing (DAS) and three-component geophones in a mining setting. The sources used for this project where a vertical sledgehammer, oriented shear sledgehammer, and blasting caps set off in both unstemmed and stemmed drillholes. Three-component Geospace 20DM geophones were compared with three different types of fiber-optic cable: (1) Brugg strain, (2) Brugg temperature, and (3) Optical Cable Corporation strain. We attached geophones to the underground mine walls and on the ground surface above the mine. We attached fiber-optic cables to the mine walls and placed fiber-optic cable in boreholes drilled through an underground pillar. In addition, we placed fiber-optic cables in a shallow trench at the surface of the mine. We converted the DAS recordings from strain rate to strain prior to comparison with the geophone data. The setup of the DAS system for this project led to a previously unknown triggering problem that compromised the early samples of the DAS traces often including the first-break times on the DAS records. Geophones clearly recorded the explosives; however, the large amount of energy and its close distance from the fiber-optic cables seemed to compromise the entire fiber loop. The underground hammer sources produced a rough match between the DAS records and the geophone records. However, the sources on the surface of the mine, specifically the sources oriented inline with the fiber-optic cables, produced a close match between the fiber-optic traces and the geophone traces. All three types of fiber-optic cable that were in the mine produced similar results, and one type did not clearly outperform the others. Instead, the coupling of the cable to rock appears to be the most important factor determining DAS data quality. Moreover, we observed the importance of coupling in the boreholes, where fiber-optic cables that were pressed against the rock face with a spacer outperformed fiber-optic cables that were fully embedded within the grout filling the inside of the borehole.

  7. Investigation of heating of 150 kV underground cable line for various conditions of laying

    NASA Astrophysics Data System (ADS)

    Kukharchuk, I. B.; Kazakov, A. V.; Trufanova, N. M.

    2018-03-01

    The work is devoted to study of temperature operation of a 150 kV underground cable line with XLPE insulation. The stationary thermal conditions were calculated. The influence of outer boundary radius selection on the temperature distribution was analyzed. The limiting value of the filling mixture thermal conductivity was found, which provides an acceptable temperature of the cable.

  8. 30 CFR 77.601 - Trailing cables or portable cables; temporary splices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables or portable cables; temporary... OF UNDERGROUND COAL MINES Trailing Cables § 77.601 Trailing cables or portable cables; temporary splices. Temporary splices in trailing cables or portable cables shall be made in a workmanlike manner and...

  9. Detail of the underground wire net mat and cable at ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail of the underground wire net mat and cable at the base of a 94' low-band reflector screen pole, view facing north - U.S. Naval Base, Pearl Harbor, Naval Radio Station, AF/FRD-10 Circularly Disposed Antenna Array, Wahiawa, Honolulu County, HI

  10. 47 CFR 36.153 - Assignment of Cable and Wire Facilities (C&WF) to categories.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 47 Telecommunication 2 2014-10-01 2014-10-01 false Assignment of Cable and Wire Facilities (C&WF... Telecommunications Property Cable and Wire Facilities § 36.153 Assignment of Cable and Wire Facilities (C&WF) to categories. (a) Cable consists of: Aerial cable, underground cable, buried cable, submarine cable, deep sea...

  11. 47 CFR 36.153 - Assignment of Cable and Wire Facilities (C&WF) to categories.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 47 Telecommunication 2 2012-10-01 2012-10-01 false Assignment of Cable and Wire Facilities (C&WF... Telecommunications Property Cable and Wire Facilities § 36.153 Assignment of Cable and Wire Facilities (C&WF) to categories. (a) Cable consists of: Aerial cable, underground cable, buried cable, submarine cable, deep sea...

  12. 47 CFR 36.153 - Assignment of Cable and Wire Facilities (C&WF) to categories.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 47 Telecommunication 2 2013-10-01 2013-10-01 false Assignment of Cable and Wire Facilities (C&WF... Telecommunications Property Cable and Wire Facilities § 36.153 Assignment of Cable and Wire Facilities (C&WF) to categories. (a) Cable consists of: Aerial cable, underground cable, buried cable, submarine cable, deep sea...

  13. Status and Progress of a Fault Current Limiting Hts Cable to BE Installed in the con EDISON Grid

    NASA Astrophysics Data System (ADS)

    Maguire, J.; Folts, D.; Yuan, J.; Henderson, N.; Lindsay, D.; Knoll, D.; Rey, C.; Duckworth, R.; Gouge, M.; Wolff, Z.; Kurtz, S.

    2010-04-01

    In the last decade, significant advances in the performance of second generation (2G) high temperature superconducting wire have made it suitable for commercially viable applications such as electric power cables and fault current limiters. Currently, the U.S. Department of Homeland Security is co-funding the design, development and demonstration of an inherently fault current limiting HTS cable under the Hydra project with American Superconductor and Consolidated Edison. The cable will be approximately 300 m long and is being designed to carry 96 MVA at a distribution level voltage of 13.8 kV. The underground cable will be installed and energized in New York City. The project is led by American Superconductor teamed with Con Edison, Ultera (Southwire and nkt cables joint venture), and Air Liquide. This paper describes the general goals, design criteria, status and progress of the project. Fault current limiting has already been demonstrated in 3 m prototype cables, and test results on a 25 m three-phase cable will be presented. An overview of the concept of a fault current limiting cable and the system advantages of this unique type of cable will be described.

  14. Ground potential rise characteristics of urban step-down substations fed by power cables - A practical example

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sobral, S.T.; Barbosa, J.O.; Numes, J.V.C.

    1988-10-01

    This paper shows some special ground potential rise characteristics of substations fed by power cables. These characteristics were detected during the study of the interconnected ground system of 14 step-down urban substations fed by the 138 kV underground cable network serving the South Zone of Rio de Janeiro city in Brazil. As this type of system is very common in large cities, the subject can be of general interest for the industry. It was verified that when a fault occurs at a ''cable substation'' (a substation fed exclusively by power cables), almost no ground potential effects were detected at themore » faulted substation or at the other ''cable substations'' of the 138 kV network. However, high values of ground potential occurred at the ''transition substations'' (substations in which the power cables are connected to overhead 138 kV transmission lines, with steel groundwires). That ground potential was enough to produce shocks and equipment damage in certain ''transition substations''. It was verified that this problem has no relation with potential transfer. The paper shows also that the utilization of overhead lines with ACSR groundwires on the initial spans closer to the ''transition substation'' would be enough to avoid the problem. Even if the ACSR conductor is used only at the initial section of one of the lines, a reduction of the problem would be obtained. The paper shows also that the utilization of ACSR ground-wires near the ''transition substations'' contributes to reduce the amount of the copper necessary to control step, touch and mess potentials in these substations. Additional mitigation procedures are also examined in the paper.« less

  15. 47 CFR 1.1306 - Actions which are categorically excluded from environmental processing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... the installation of aerial wire or cable over existing aerial corridors of prior or permitted use or the underground installation of wire or cable along existing underground corridors of prior or permitted use, established by the applicant or others. The use of existing buildings, towers or corridors is...

  16. 30 CFR 57.12003 - Trailing cable overload protection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Trailing cable overload protection. 57.12003 Section 57.12003 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Electricity Surface and Underground § 57.12003...

  17. 30 CFR 57.12003 - Trailing cable overload protection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Trailing cable overload protection. 57.12003 Section 57.12003 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Electricity Surface and Underground § 57.12003...

  18. 30 CFR 57.12003 - Trailing cable overload protection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Trailing cable overload protection. 57.12003 Section 57.12003 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Electricity Surface and Underground § 57.12003...

  19. 30 CFR 57.12003 - Trailing cable overload protection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Trailing cable overload protection. 57.12003 Section 57.12003 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-UNDERGROUND METAL AND NONMETAL MINES Electricity Surface and Underground § 57.12003...

  20. 75 FR 41890 - In the Matter of Certain Underground Cable and Pipe Locators; Notice of Investigation

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ... INTERNATIONAL TRADE COMMISSION [Inv. No. 337-TA-727] In the Matter of Certain Underground Cable and Pipe Locators; Notice of Investigation AGENCY: U.S. International Trade Commission. ACTION... filed with the U.S. International Trade Commission on June 10, 2010, under section 337 of the Tariff Act...

  1. 30 CFR 75.600 - Trailing cables; flame resistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables; flame resistance. 75.600... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trailing Cables § 75.600 Trailing cables; flame resistance. [Statutory Provisions] Trailing cables used in coal mines shall meet the...

  2. 30 CFR 75.606 - Protection of trailing cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Protection of trailing cables. 75.606 Section... AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trailing Cables § 75.606 Protection of trailing cables. [Statutory Provisions] Trailing cables shall be adequately protected to prevent damage by...

  3. 30 CFR 75.601 - Short circuit protection of trailing cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Short circuit protection of trailing cables. 75... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trailing Cables § 75.601 Short circuit protection of trailing cables. [Statutory Provisions] Short circuit protection for trailing cables...

  4. 30 CFR 77.603 - Clamping of trailing cables to equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Clamping of trailing cables to equipment. 77.603 Section 77.603 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL... UNDERGROUND COAL MINES Trailing Cables § 77.603 Clamping of trailing cables to equipment. Trailing cables...

  5. 30 CFR 75.603 - Temporary splice of trailing cable.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Temporary splice of trailing cable. 75.603... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trailing Cables § 75.603 Temporary splice of trailing cable. [Statutory Provision] One temporary splice may be made in any trailing cable...

  6. 30 CFR 75.602 - Trailing cable junctions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cable junctions. 75.602 Section 75.602... MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trailing Cables § 75.602 Trailing cable junctions. [Statutory Provision] When two or more trailing cables junction to the same distribution center, means shall...

  7. 30 CFR 75.604 - Permanent splicing of trailing cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Permanent splicing of trailing cables. 75.604... SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trailing Cables § 75.604 Permanent splicing of trailing cables. [Statutory Provisions] When permanent splices in trailing cables are made...

  8. 30 CFR 75.605 - Clamping of trailing cables to equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Clamping of trailing cables to equipment. 75... MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trailing Cables § 75.605 Clamping of trailing cables to equipment. [Statutory Provisions] Trailing cables shall be clamped to...

  9. 30 CFR 77.600 - Trailing cables; short-circuit protection; disconnecting devices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables; short-circuit protection... AREAS OF UNDERGROUND COAL MINES Trailing Cables § 77.600 Trailing cables; short-circuit protection; disconnecting devices. Short-circuit protection for trailing cables shall be provided by an automatic circuit...

  10. 30 CFR 57.12003 - Trailing cable overload protection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cable overload protection. 57.12003... Electricity Surface and Underground § 57.12003 Trailing cable overload protection. Individual overload protection or short circuit protection shall be provided for the trailing cables of mobile equipment. ...

  11. 75 FR 82069 - In the Matter of Certain Underground Cable and Pipe Locators; Notice of Commission Decision Not...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... to review initial determinations (``IDs'') (Order Nos. 5 and 6) terminating the investigation based... underground cable and pipe locators that infringe certain claims of U.S. Patent No. 6,268,731. The complaint... response in support of the motions to terminate. On December 1, 2010, the ALJ issued Order Nos. 5 and 6...

  12. 30 CFR 57.12038 - Attachment of trailing cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Attachment of trailing cables. 57.12038 Section 57.12038 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Electricity Surface and Underground § 57.12038 Attachment of trailing cables. Trailing cables shall be...

  13. 30 CFR 77.804 - High-voltage trailing cables; minimum design requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false High-voltage trailing cables; minimum design... OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.804 High-voltage trailing cables; minimum design requirements. (a) High-voltage trailing cables used in resistance grounded systems shall be...

  14. 30 CFR 57.12039 - Protection of surplus trailing cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Protection of surplus trailing cables. 57.12039 Section 57.12039 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND... Electricity Surface and Underground § 57.12039 Protection of surplus trailing cables. Surplus trailing cables...

  15. 30 CFR 77.804 - High-voltage trailing cables; minimum design requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false High-voltage trailing cables; minimum design... OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.804 High-voltage trailing cables; minimum design requirements. (a) High-voltage trailing cables used in resistance grounded systems shall be...

  16. 30 CFR 77.804 - High-voltage trailing cables; minimum design requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false High-voltage trailing cables; minimum design... OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.804 High-voltage trailing cables; minimum design requirements. (a) High-voltage trailing cables used in resistance grounded systems shall be...

  17. 30 CFR 77.804 - High-voltage trailing cables; minimum design requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false High-voltage trailing cables; minimum design... OF UNDERGROUND COAL MINES Surface High-Voltage Distribution § 77.804 High-voltage trailing cables; minimum design requirements. (a) High-voltage trailing cables used in resistance grounded systems shall be...

  18. 30 CFR 75.822 - Underground high-voltage longwall cables.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... be a type SHD cable with a center ground-check conductor no smaller than a No. 16 AWG stranded conductor. The cables must be MSHA accepted as flame-resistant under part 18 or approved under subpart K of...

  19. 30 CFR 75.822 - Underground high-voltage longwall cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... be a type SHD cable with a center ground-check conductor no smaller than a No. 16 AWG stranded conductor. The cables must be MSHA accepted as flame-resistant under part 18 or approved under subpart K of...

  20. 30 CFR 57.12088 - Splicing trailing cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Splicing trailing cables. 57.12088 Section 57... Underground Only § 57.12088 Splicing trailing cables. No splice, except a vulcanized splice or its equivalent, shall be made in a trailing cable within 25 feet of the machine unless the machine is equipped with a...

  1. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Trailing cables for mobile equipment, ground... Underground Low- and Medium-Voltage Alternating Current Circuits § 75.906 Trailing cables for mobile equipment, ground wires, and ground check wires. [Statutory Provisions] Trailing cables for mobile equipment shall...

  2. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Trailing cables for mobile equipment, ground... Underground Low- and Medium-Voltage Alternating Current Circuits § 75.906 Trailing cables for mobile equipment, ground wires, and ground check wires. [Statutory Provisions] Trailing cables for mobile equipment shall...

  3. 30 CFR 75.906 - Trailing cables for mobile equipment, ground wires, and ground check wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Trailing cables for mobile equipment, ground... Underground Low- and Medium-Voltage Alternating Current Circuits § 75.906 Trailing cables for mobile equipment, ground wires, and ground check wires. [Statutory Provisions] Trailing cables for mobile equipment shall...

  4. McClellan PV system installation provides key lessons

    NASA Astrophysics Data System (ADS)

    Kauffman, W. R.

    Design features and lessons learned in the installation of a 40 kWp solar cell array to supply power to a market on an airbase are outlined. The fixed-position modules interface with an inverter, ac and dc switchgear, controls, instrumentation, and an energy management system. The power control unit has a peak power tracking feature to maximize output from the 1142 cell modules. The inverter has functioned at over 98 percent efficiency near the 25 kW design range of the array. Moisture sealing to prevent ground faults was found necessary during the installation of the underground cabling.

  5. Research to develop guidelines for cathodic protection of concentric neutral cables, volume 2

    NASA Astrophysics Data System (ADS)

    Hanck, J. A.; Nekoksa, G.

    1981-08-01

    Data from field tests and sieve analyses presented in support of an effort to develop guidelines for the installation of underground transmission primary cables. Anodic and cathodic polarization curves and the surface and cable potential gradients from 38 bellholes.

  6. 30 CFR 75.807 - Installation of high-voltage transmission cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Installation of high-voltage transmission...-Voltage Distribution § 75.807 Installation of high-voltage transmission cables. [Statutory Provisions] All underground high-voltage transmission cables shall be installed only in regularly inspected air courses and...

  7. A Routing Protocol for Multisink Wireless Sensor Networks in Underground Coalmine Tunnels

    PubMed Central

    Xia, Xu; Chen, Zhigang; Liu, Hui; Wang, Huihui; Zeng, Feng

    2016-01-01

    Traditional underground coalmine monitoring systems are mainly based on the use of wired transmission. However, when cables are damaged during an accident, it is difficult to obtain relevant data on environmental parameters and the emergency situation underground. To address this problem, the use of wireless sensor networks (WSNs) has been proposed. However, the shape of coalmine tunnels is not conducive to the deployment of WSNs as they are long and narrow. Therefore, issues with the network arise, such as extremely large energy consumption, very weak connectivity, long time delays, and a short lifetime. To solve these problems, in this study, a new routing protocol algorithm for multisink WSNs based on transmission power control is proposed. First, a transmission power control algorithm is used to negotiate the optimal communication radius and transmission power of each sink. Second, the non-uniform clustering idea is adopted to optimize the cluster head selection. Simulation results are subsequently compared to the Centroid of the Nodes in a Partition (CNP) strategy and show that the new algorithm delivers a good performance: power efficiency is increased by approximately 70%, connectivity is increased by approximately 15%, the cluster interference is diminished by approximately 50%, the network lifetime is increased by approximately 6%, and the delay is reduced with an increase in the number of sinks. PMID:27916917

  8. A Routing Protocol for Multisink Wireless Sensor Networks in Underground Coalmine Tunnels.

    PubMed

    Xia, Xu; Chen, Zhigang; Liu, Hui; Wang, Huihui; Zeng, Feng

    2016-11-30

    Traditional underground coalmine monitoring systems are mainly based on the use of wired transmission. However, when cables are damaged during an accident, it is difficult to obtain relevant data on environmental parameters and the emergency situation underground. To address this problem, the use of wireless sensor networks (WSNs) has been proposed. However, the shape of coalmine tunnels is not conducive to the deployment of WSNs as they are long and narrow. Therefore, issues with the network arise, such as extremely large energy consumption, very weak connectivity, long time delays, and a short lifetime. To solve these problems, in this study, a new routing protocol algorithm for multisink WSNs based on transmission power control is proposed. First, a transmission power control algorithm is used to negotiate the optimal communication radius and transmission power of each sink. Second, the non-uniform clustering idea is adopted to optimize the cluster head selection. Simulation results are subsequently compared to the Centroid of the Nodes in a Partition (CNP) strategy and show that the new algorithm delivers a good performance: power efficiency is increased by approximately 70%, connectivity is increased by approximately 15%, the cluster interference is diminished by approximately 50%, the network lifetime is increased by approximately 6%, and the delay is reduced with an increase in the number of sinks.

  9. An Integrated Environment Monitoring System for Underground Coal Mines—Wireless Sensor Network Subsystem with Multi-Parameter Monitoring

    PubMed Central

    Zhang, Yu; Yang, Wei; Han, Dongsheng; Kim, Young-Il

    2014-01-01

    Environment monitoring is important for the safety of underground coal mine production, and it is also an important application of Wireless Sensor Networks (WSNs). We put forward an integrated environment monitoring system for underground coal mine, which uses the existing Cable Monitoring System (CMS) as the main body and the WSN with multi-parameter monitoring as the supplementary technique. As CMS techniques are mature, this paper mainly focuses on the WSN and the interconnection between the WSN and the CMS. In order to implement the WSN for underground coal mines, two work modes are designed: periodic inspection and interrupt service; the relevant supporting technologies, such as routing mechanism, collision avoidance, data aggregation, interconnection with the CMS, etc., are proposed and analyzed. As WSN nodes are limited in energy supply, calculation and processing power, an integrated network management scheme is designed in four aspects, i.e., topology management, location management, energy management and fault management. Experiments were carried out both in a laboratory and in a real underground coal mine. The test results indicate that the proposed integrated environment monitoring system for underground coal mines is feasible and all designs performed well as expected. PMID:25051037

  10. An integrated environment monitoring system for underground coal mines--Wireless Sensor Network subsystem with multi-parameter monitoring.

    PubMed

    Zhang, Yu; Yang, Wei; Han, Dongsheng; Kim, Young-Il

    2014-07-21

    Environment monitoring is important for the safety of underground coal mine production, and it is also an important application of Wireless Sensor Networks (WSNs). We put forward an integrated environment monitoring system for underground coal mine, which uses the existing Cable Monitoring System (CMS) as the main body and the WSN with multi-parameter monitoring as the supplementary technique. As CMS techniques are mature, this paper mainly focuses on the WSN and the interconnection between the WSN and the CMS. In order to implement the WSN for underground coal mines, two work modes are designed: periodic inspection and interrupt service; the relevant supporting technologies, such as routing mechanism, collision avoidance, data aggregation, interconnection with the CMS, etc., are proposed and analyzed. As WSN nodes are limited in energy supply, calculation and processing power, an integrated network management scheme is designed in four aspects, i.e., topology management, location management, energy management and fault management. Experiments were carried out both in a laboratory and in a real underground coal mine. The test results indicate that the proposed integrated environment monitoring system for underground coal mines is feasible and all designs performed well as expected.

  11. 30 CFR 75.600-1 - Approved cables; flame resistance.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Approved cables; flame resistance. 75.600-1 Section 75.600-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Trailing Cables § 75.600-1 Approved...

  12. 47 CFR 36.151 - General.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... communications plant in service: Poles and antenna supporting structures, aerial cable, underground cable, buried... 47 Telecommunication 2 2011-10-01 2011-10-01 false General. 36.151 Section 36.151 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES JURISDICTIONAL SEPARATIONS...

  13. Development of a leak location system for use on underground electric power transmission cable

    NASA Astrophysics Data System (ADS)

    Williams, J. A.

    1982-10-01

    This report describes a study to evaluate methods for locating leaks of dielectric fluid from buried high voltage cable systems. Two primary types of leak location systems were investigated: (1) systems that will rapidly isolate the leak within a manhole section, typically 1000 m long on a feeder that might be 30 km long; and (2) systems that will then pinpoint the location of the leak. Rapid leak isolation was accomplished by developing an enhanced conductivity oil probe which allows the injection of a small quantity of conductive oil and which indicates the path of the oil as it drifts downstream in the direction of the leak. Two methods for pinpointing the leak were proven. The more successful method was the use of trained leak location dogs which were found to have far better sensitivity than instruments and which could detect cable oil alone without the need for additives. A tracer gas injection and detection scheme was developed for use in areas where the dogs may be unsuitable.

  14. Models for electromagnetic coupling of lightning onto multiconductor cables in underground cavities

    NASA Astrophysics Data System (ADS)

    Higgins, Matthew Benjamin

    This dissertation documents the measurements, analytical modeling, and numerical modeling of electromagnetic transfer functions to quantify the ability of cloud-to-ground lightning strokes (including horizontal arc-channel components) to couple electromagnetic energy onto multiconductor cables in an underground cavity. Measurements were performed at the Sago coal mine located near Buckhannon, WV. These transfer functions, coupled with mathematical representations of lightning strokes, are then used to predict electric fields within the mine and induced voltages on a cable that was left abandoned in the sealed area of the Sago mine. If voltages reached high enough levels, electrical arcing could have occurred from the abandoned cable. Electrical arcing is known to be an effective ignition source for explosive gas mixtures. Two coupling mechanisms were measured: direct and indirect drive. Direct coupling results from the injection or induction of lightning current onto metallic conductors such as the conveyors, rails, trolley communications cable, and AC power shields that connect from the outside of the mine to locations deep within the mine. Indirect coupling results from electromagnetic field propagation through the earth as a result of a cloud-to-ground lightning stroke or a long, low-altitude horizontal current channel from a cloud-to-ground stroke. Unlike direct coupling, indirect coupling does not require metallic conductors in a continuous path from the surface to areas internal to the mine. Results from the indirect coupling measurements and analysis are of great concern. The field measurements, modeling, and analysis indicate that significant energy can be coupled directly into the sealed area of the mine. Due to the relatively low frequency content of lightning (< 100 kHz), electromagnetic energy can readily propagate through hundreds of feet of earth. Indirect transfer function measurements compare extremely well with analytical and computational models developed for the Sago site which take into account measured soil properties.

  15. Second-Generation High-Temperature Superconductor Wires for the Electric Power Grid

    NASA Astrophysics Data System (ADS)

    Malozemoff, A. P.

    2012-08-01

    Superconductors offer major advantages for the electric power grid, including high current and power capacity, high efficiency arising from the lossless current flow, and a unique current-limiting functionality arising from a superconductor-to-resistive transition. These advantages can be brought to bear on equipment such as underground power cables, fault current limiters, rotating machinery, transformers, and energy storage. The first round of significant commercial-scale superconductor power-equipment demonstrations, carried out during the past decade, relied on a first-generation high-temperature superconductor (HTS) wire. However, during the past few years, with the recent commercial availability of high-performance second-generation HTS wires, power-equipment demonstrations have increasingly been carried out with these new wires, which bring important advantages. The foundation is being laid for commercial expansion of this important technology into the power grid.

  16. Burns from buried electric cables.

    PubMed

    Gault, D T; Eve, M D

    1987-04-01

    Twenty-six patients who sustained significant burn injuries as a result of striking underground electric cables are reviewed. This study sets out to highlight why such injuries occur and to recommend preventive measures to those digging in the London area. There were three deaths in this series.

  17. 30 CFR 77.503-1 - Electric conductors.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Cable Engineers Association—National Electric Manufacturers Association in effect when such cables are... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Electric conductors. 77.503-1 Section 77.503-1... MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Electrical...

  18. 30 CFR 77.503-1 - Electric conductors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Cable Engineers Association—National Electric Manufacturers Association in effect when such cables are... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electric conductors. 77.503-1 Section 77.503-1... MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Electrical...

  19. 30 CFR 77.503-1 - Electric conductors.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Cable Engineers Association—National Electric Manufacturers Association in effect when such cables are... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Electric conductors. 77.503-1 Section 77.503-1... MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Electrical...

  20. 30 CFR 77.503-1 - Electric conductors.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Cable Engineers Association—National Electric Manufacturers Association in effect when such cables are... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Electric conductors. 77.503-1 Section 77.503-1... MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Electrical...

  1. 30 CFR 77.503-1 - Electric conductors.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Cable Engineers Association—National Electric Manufacturers Association in effect when such cables are... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Electric conductors. 77.503-1 Section 77.503-1... MANDATORY SAFETY STANDARDS, SURFACE COAL MINES AND SURFACE WORK AREAS OF UNDERGROUND COAL MINES Electrical...

  2. Detectability of underground electrical cables junction with a ground penetrating radar: electromagnetic simulation and experimental measurements

    NASA Astrophysics Data System (ADS)

    Liu, Xiang; serhir, mohammed; kameni, abelin; lambert, marc; pichon, lionel

    2016-04-01

    For a company like Electricity De France (EDF), being able to detect accurately using non-destructive methods the position of the buried junction between two underground cables is a crucial issue. The junction is the linking part where most maintenance operations are carried out. The challenge of this work is to conduct a feasibility study to confirm or deny the relevance of Ground Penetrating Radar (GPR) to detect these buried junctions in their actual environment against clutter. Indeed, the cables are buried in inhomogeneous medium at around 80cm deep. To do this, the study is conducted in a numerical environment. We use the 3D simulation software CST MWS to model a GPR scenario. In this simulation, we place the already optimized bowtie antennas operating in the frequency band [0.5 GHz - 3 GHz] in front of wet soil (dispersive) and dry soil where the underground cable is placed at 80cm deep. We collect the amplitude and phase of the reflected waves in order to detect the contrast provoked by the geometric dimensions variation of the cable [1] (diameter of the cable is 48mm and the diameter of the junction 74mm). The use of an ultra-wideband antenna is necessary to reconcile resolution and penetration of electromagnetic waves in the medium to be characterized. We focus on the performance of the GPR method according to the characteristics of the surrounding medium in which the electric cables are buried, the polarization of the Tx and Rx antennas. The experimental measurement collected in the EDF site will be presented. The measured data are processed using the clutter reduction method based on digital filtering [2]. We aim at showing that using the developed bowtie antennas that the GPR technique is well adapted for the cable junction localization even in cluttered environment. References [1] D. J. Daniels, "Surface-Penetrating Radar", London, IEE 1996. [2] Potin, D.; Duflos, E.; Vanheeghe, P., "Landmines Ground-Penetrating Radar Signal Enhancement by Digital Filtering," in Geoscience and Remote Sensing, IEEE Transactions on , vol.44, no.9, pp.2393-2406, Sept. 2006 .

  3. 47 CFR 1.1306 - Actions which are categorically excluded from environmental processing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... aerial corridors of prior or permitted use or the underground installation of wire or cable along existing underground corridors of prior or permitted use, established by the applicant or others. The use of existing buildings, towers or corridors is an environmentally desirable alternative to the...

  4. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 4 2011-10-01 2011-10-01 false Protection of insulated wire; splice in underground wire. 236.74 Section 236.74 Transportation Other Regulations Relating to Transportation (Continued..., AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...

  5. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 4 2010-10-01 2010-10-01 false Protection of insulated wire; splice in underground wire. 236.74 Section 236.74 Transportation Other Regulations Relating to Transportation (Continued..., AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...

  6. A study of temporal dynamics and spatial variability of power frequency electromagnetic fields in Saint-Petersburg

    NASA Astrophysics Data System (ADS)

    Sturman, V. I.

    2018-01-01

    This paper studies spatial distribution and temporal dynamics of power frequency electric and magnetic fields in Saint-Petersburg. It was determined that sanitary-protection and exclusion zones of the standard size high-voltage transmission lines (HVTL) do not always ensure maximum allowable limits of the electrical field depression. A dependence of the electric field strength on meteorological factors was defined. A series of sources create a city-wide background for magnetic fields. That said, the heavier the man-caused load is, the higher the mean values of magnetic induction are. Abnormally high values of magnetic induction are explained by the influence of underground electric cables.

  7. Teleoperated control system for underground room and pillar mining

    DOEpatents

    Mayercheck, William D.; Kwitowski, August J.; Brautigam, Albert L.; Mueller, Brian K.

    1992-01-01

    A teleoperated mining system is provided for remotely controlling the various machines involved with thin seam mining. A thin seam continuous miner located at a mining face includes a camera mounted thereon and a slave computer for controlling the miner and the camera. A plurality of sensors for relaying information about the miner and the face to the slave computer. A slave computer controlled ventilation sub-system which removes combustible material from the mining face. A haulage sub-system removes material mined by the continuous miner from the mining face to a collection site and is also controlled by the slave computer. A base station, which controls the supply of power and water to the continuous miner, haulage system, and ventilation systems, includes cable/hose handling module for winding or unwinding cables/hoses connected to the miner, an operator control module, and a hydraulic power and air compressor module for supplying air to the miner. An operator controlled host computer housed in the operator control module is connected to the slave computer via a two wire communications line.

  8. Magnetic fields and childhood cancer: an epidemiological investigation of the effects of high-voltage underground cables.

    PubMed

    Bunch, K J; Swanson, J; Vincent, T J; Murphy, M F G

    2015-09-01

    Epidemiological evidence of increased risks for childhood leukaemia from magnetic fields has implicated, as one source of such fields, high-voltage overhead lines. Magnetic fields are not the only factor that varies in their vicinity, complicating interpretation of any associations. Underground cables (UGCs), however, produce magnetic fields but have no other discernible effects in their vicinity. We report here the largest ever epidemiological study of high voltage UGCs, based on 52,525 cases occurring from 1962-2008, with matched birth controls. We calculated the distance of the mother's address at child's birth to the closest 275 or 400 kV ac or high-voltage dc UGC in England and Wales and the resulting magnetic fields. Few people are exposed to magnetic fields from UGCs limiting the statistical power. We found no indications of an association of risk with distance or of trend in risk with increasing magnetic field for leukaemia, and no convincing pattern of risks for any other cancer. Trend estimates for leukaemia as shown by the odds ratio (and 95% confidence interval) per unit increase in exposure were: reciprocal of distance 0.99 (0.95-1.03), magnetic field 1.01 (0.76-1.33). The absence of risk detected in relation to UGCs tends to add to the argument that any risks from overhead lines may not be caused by magnetic fields.

  9. Grounding and Shielding Requirements for the Radiation and EMP Environments of an Underground Nuclear Test

    DTIC Science & Technology

    1978-03-17

    the trailers as Electro-magnetic Interference ( EMI ) tight as possible; such items included removal of all unnecessary wiring penetrations, conductive...20 12. CABLE TRAYS, GROUT-FILLED ............ .................. 21 13. THE MESA TRAILER PARK CONSIDERATIONS...enclosed cable shields. 12. The mesa trailer park received some attention regarding the GSP, although not as intense as the tunnel environment. Specifically

  10. 30 CFR 75.607 - Breaking trailing cable and power cable connections.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Breaking trailing cable and power cable....607 Breaking trailing cable and power cable connections. [Statutory Provisions] Trailing cable and power cable connections to junction boxes shall not be made or broken under load. ...

  11. 30 CFR 75.607 - Breaking trailing cable and power cable connections.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Breaking trailing cable and power cable....607 Breaking trailing cable and power cable connections. [Statutory Provisions] Trailing cable and power cable connections to junction boxes shall not be made or broken under load. ...

  12. 30 CFR 75.607 - Breaking trailing cable and power cable connections.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Breaking trailing cable and power cable....607 Breaking trailing cable and power cable connections. [Statutory Provisions] Trailing cable and power cable connections to junction boxes shall not be made or broken under load. ...

  13. 30 CFR 75.607 - Breaking trailing cable and power cable connections.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Breaking trailing cable and power cable....607 Breaking trailing cable and power cable connections. [Statutory Provisions] Trailing cable and power cable connections to junction boxes shall not be made or broken under load. ...

  14. Photoacoustic Detection of Perfluorocarbon Tracers in Air for Application to Leak Detection in Oil-Filled Cables

    NASA Astrophysics Data System (ADS)

    Zajarevich, N.; Slezak, V.; Peuriot, A.; Villa, G.; Láttero, A.; Crivicich, R.

    2013-09-01

    The underground oil-filled cable consists of a hollow copper conductor surrounded by oiled paper which acts as electrical insulation. The oil flows along the conductor and diffuses through it to the insulating paper. A lead sheath is used as the outer retaining wall. As the deterioration of this cover may cause a loss of insulation fluid, its detection is very important since this high voltage and power cable is used in cities even under sidewalks. The method of perfluorocarbon vapor tracers, based on the injection and subsequent detection of these volatile chemical substances in the vicinity of the cable, is one of the most promising methods, so far used in combination with gas chromatography and mass spectrometry. In this study, the possibility of detecting two different tracers, and , by means of resonant photoacoustic spectroscopy is studied. The beam from a tunable amplitude-modulated laser goes through an aluminum cell with quarter wave filters at both ends of an open resonator and an electret microphone in its center, attached to the walls. The calibration of the system for either substance diluted in chromatographic air showed a higher sensitivity for , so the experiment was completed checking the behavior of this substance in samples prepared with ambient air in order to analyze the application of the system to field studies.

  15. 30 CFR 75.508 - Map of electrical system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... apparatus in connection with the mine electric system, including permanent cables, switchgear, rectifying... direct-current circuit breakers protecting underground trolley circuits, shall be shown on a mine map...

  16. 30 CFR 75.508 - Map of electrical system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... apparatus in connection with the mine electric system, including permanent cables, switchgear, rectifying... direct-current circuit breakers protecting underground trolley circuits, shall be shown on a mine map...

  17. Water-Tree Modelling and Detection for Underground Cables

    NASA Astrophysics Data System (ADS)

    Chen, Qi

    In recent years, aging infrastructure has become a major concern for the power industry. Since its inception in early 20th century, the electrical system has been the cornerstone of an industrial society. Stable and uninterrupted delivery of electrical power is now a base necessity for the modern world. As the times march-on, however, the electrical infrastructure ages and there is the inevitable need to renew and replace the existing system. Unfortunately, due to time and financial constraints, many electrical systems today are forced to operate beyond their original design and power utilities must find ways to prolong the lifespan of older equipment. Thus, the concept of preventative maintenance arises. Preventative maintenance allows old equipment to operate longer and at better efficiency, but in order to implement preventative maintenance, the operators must know minute details of the electrical system, especially some of the harder to assess issues such water-tree. Water-tree induced insulation degradation is a problem typically associated with older cable systems. It is a very high impedance phenomenon and it is difficult to detect using traditional methods such as Tan-Delta or Partial Discharge. The proposed dissertation studies water-tree development in underground cables, potential methods to detect water-tree location and water-tree severity estimation. The dissertation begins by developing mathematical models of water-tree using finite element analysis. The method focuses on surface-originated vented tree, the most prominent type of water-tree fault in the field. Using the standard operation parameters of North American electrical systems, the water-tree boundary conditions are defined. By applying finite element analysis technique, the complex water-tree structure is broken down to homogeneous components. The result is a generalized representation of water-tree capacitance at different stages of development. The result from the finite element analysis is used to model water-tree in large system. Both empirical measurements and the mathematical model show that the impedance of early-stage water-tree is extremely large. As the result, traditional detection methods such Tan-Delta or Partial Discharge are not effective due to the excessively high accuracy requirement. A high-frequency pulse detection method is developed instead. The water-tree impedance is capacitive in nature and it can be reduced to manageable level by high-frequency inputs. The method is able to determine the location of early-stage water-tree in long-distance cables using economically feasible equipment. A pattern recognition method is developed to estimate the severity of water-tree using its pulse response from the high-frequency test method. The early-warning system for water-tree appearance is a tool developed to assist the practical implementation of the high-frequency pulse detection method. Although the equipment used by the detection method is economically feasible, it is still a specialized test and not designed for constant monitoring of the system. The test also place heavy stress on the cable and it is most effective when the cable is taken offline. As the result, utilities need a method to estimate the likelihood of water-tree presence before subjecting the cable to the specialized test. The early-warning system takes advantage of naturally occurring high-frequency events in the system and uses a deviation-comparison method to estimate the probability of water-tree presence on the cable. If the likelihood is high, then the utility can use the high-frequency pulse detection method to obtain accurate results. Specific pulse response patterns can be used to calculate the capacitance of water-tree. The calculated result, however, is subjected to margins of error due to limitations from the real system. There are both long-term and short-term methods to improve the accuracy. Computation algorithm improvement allows immediate improvement on accuracy of the capacitance estimation. The probability distribution of the calculation solution showed that improvements in waveform time-step measurement allow fundamental improves to the overall result.

  18. Differential Impedance Obstacle Detection Sensor (DIOD) - Phase 2

    DOT National Transportation Integrated Search

    2006-11-01

    To minimize excavations and public inconvenience, utilities often use horizontal directional drilling (HDD) to create underground pathways for the installation of pipes, cables, and other utility lines. While HDD provides efficiency improvements over...

  19. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...

  20. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...

  1. 49 CFR 236.74 - Protection of insulated wire; splice in underground wire.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... THE INSTALLATION, INSPECTION, MAINTENANCE, AND REPAIR OF SIGNAL AND TRAIN CONTROL SYSTEMS, DEVICES, AND APPLIANCES Rules and Instructions: All Systems Wires and Cables § 236.74 Protection of insulated...

  2. Photovoltaic Power System and Power Distribution Demonstration for the Desert RATS Program

    NASA Technical Reports Server (NTRS)

    Colozza, Anthony; Jakupca, Ian; Mintz, Toby; Herlacher, Mike; Hussey, Sam

    2012-01-01

    A stand alone, mobile photovoltaic power system along with a cable deployment system was designed and constructed to take part in the Desert Research And Technology Studies (RATS) lunar surface human interaction evaluation program at Cinder Lake, Arizona. The power system consisted of a photovoltaic array/battery system. It is capable of providing 1 kW of electrical power. The system outputs were 48 V DC, 110 V AC, and 220 V AC. A cable reel with 200 m of power cable was used to provide power from the trailer to a remote location. The cable reel was installed on a small trailer. The reel was powered to provide low to no tension deployment of the cable. The cable was connected to the 220 V AC output of the power system trailer. The power was then converted back to 110 V AC on the cable deployment trailer for use at the remote site. The Scout lunar rover demonstration vehicle was used to tow the cable trailer and deploy the power cable. This deployment was performed under a number of operational scenarios, manned operation, remote operation and tele-robotically. Once deployed, the cable was used to provide power, from the power system trailer, to run various operational tasks at the remote location.

  3. Corrosion potential analysis system

    NASA Astrophysics Data System (ADS)

    Kiefer, Karl F.

    1998-03-01

    Many cities in the northeastern U.S. transport electrical power from place to place via underground cables, which utilize voltages from 68 kv to 348 kv. These cables are placed in seamless steel pipe to protect the conductors. These buried pipe-type-cables (PTCs) are carefully designed and constantly pressurized with transformer oil to prevent any possible contamination. A protective coating placed on the outside diameter of the pipe during manufacture protects the steel pipe from the soil environment. Notwithstanding the protection mechanisms available, the pipes remain vulnerable to electrochemical corrosion processes. If undetected, corrosion can cause the pipes to leak transformer oil into the environment. These leaks can assume serious proportions due to the constant pressure on the inside of the pipe. A need exists for a detection system that can dynamically monitor the corrosive potential on the length of the pipe and dynamically adjust cathodic protection to counter local and global changes in the cathodic environment surrounding the pipes. The northeastern United States contains approximately 1000 miles of this pipe. This milage is critical to the transportation and distribution of power. So critical, that each of the pipe runs has a redundant double running parallel to it. Invocon, Inc. proposed and tested a technically unique and cost effective solution to detect critical corrosion potential and to communicate that information to a central data collection and analysis location. Invocon's solution utilizes the steel of the casing pipe as a communication medium. Each data gathering station on the pipe can act as a relay for information gathered elsewhere on the pipe. These stations must have 'smart' network configuration algorithms that constantly test various communication paths and determine the best and most power efficient route through which information should flow. Each network station also performs data acquisition and analysis tasks that ultimately determine the corrosion risk in a local area. The system has virtually no installation costs and can operate on battery power for at least two years.

  4. Innovative and effective techniques for locating underground conduits.

    DOT National Transportation Integrated Search

    2011-06-01

    The New Jersey Department of Transportation (NJDOT) operates and maintains a network of : thousands of miles of conduits, many carrying fiber optic cables, that is vital to the States : communication system. These conduits frequently must be locat...

  5. High power cable with internal water cooling 400 kV

    NASA Astrophysics Data System (ADS)

    Rasquin, W.; Harjes, B.

    1982-08-01

    Due to the concentration of electricity production in large power plants, the need of higher power transmissions, and the protection of environment, developement of a 400 kV water cooled cable in the power range of 1 to 5 GVA was undertaken. The fabrication and testing of equipment, engineering of cable components, fabrication of a test cable, development of cable terminal laboratory, testing of test cable, field testing of test cable, fabrication of industrial cable laboratory, testing of industrial cable, field testing of industrial cable, and system analysis for optimization were prepared. The field testing was impossible to realize. However, it is proved that a cable consisting of an internal stainless steel water cooled tube, covered by stranded copper profiles, insulated with heavy high quality paper, and protected by an aluminum cover can be produced, withstand tests accordingly to IEC/VDE recommendations, and is able to fulfill all exploitation conditions.

  6. Photonic-powered cable assembly

    DOEpatents

    Sanderson, Stephen N.; Appel, Titus James; Wrye, IV, Walter C.

    2013-01-22

    A photonic-cable assembly includes a power source cable connector ("PSCC") coupled to a power receive cable connector ("PRCC") via a fiber cable. The PSCC electrically connects to a first electronic device and houses a photonic power source and an optical data transmitter. The fiber cable includes an optical transmit data path coupled to the optical data transmitter, an optical power path coupled to the photonic power source, and an optical feedback path coupled to provide feedback control to the photonic power source. The PRCC electrically connects to a second electronic device and houses an optical data receiver coupled to the optical transmit data path, a feedback controller coupled to the optical feedback path to control the photonic power source, and a photonic power converter coupled to the optical power path to convert photonic energy received over the optical power path to electrical energy to power components of the PRCC.

  7. Photonic-powered cable assembly

    DOEpatents

    Sanderson, Stephen N; Appel, Titus James; Wrye, IV, Walter C

    2014-06-24

    A photonic-cable assembly includes a power source cable connector ("PSCC") coupled to a power receive cable connector ("PRCC") via a fiber cable. The PSCC electrically connects to a first electronic device and houses a photonic power source and an optical data transmitter. The fiber cable includes an optical transmit data path coupled to the optical data transmitter, an optical power path coupled to the photonic power source, and an optical feedback path coupled to provide feedback control to the photonic power source. The PRCC electrically connects to a second electronic device and houses an optical data receiver coupled to the optical transmit data path, a feedback controller coupled to the optical feedback path to control the photonic power source, and a photonic power converter coupled to the optical power path to convert photonic energy received over the optical power path to electrical energy to power components of the PRCC.

  8. 30 CFR 75.1107-1 - Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... requirements of §§ 75.1107-3 through 75.1107-16. (3) Unattended enclosed motors, controls, transformers... surface, platform, or equivalent. The electrical cables at such equipment shall conform with the...

  9. 30 CFR 75.517 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Power wires and cables; insulation and...-General § 75.517 Power wires and cables; insulation and protection. [Statutory Provisions] Power wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately...

  10. 30 CFR 75.517 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Power wires and cables; insulation and...-General § 75.517 Power wires and cables; insulation and protection. [Statutory Provisions] Power wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately...

  11. 30 CFR 75.517 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Power wires and cables; insulation and...-General § 75.517 Power wires and cables; insulation and protection. [Statutory Provisions] Power wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately...

  12. 30 CFR 75.517 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Power wires and cables; insulation and...-General § 75.517 Power wires and cables; insulation and protection. [Statutory Provisions] Power wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately...

  13. 30 CFR 75.517 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Power wires and cables; insulation and...-General § 75.517 Power wires and cables; insulation and protection. [Statutory Provisions] Power wires and cables, except trolley wires, trolley feeder wires, and bare signal wires, shall be insulated adequately...

  14. Techniques for hazard analysis and their use at CERN.

    PubMed

    Nuttall, C; Schönbacher, H

    2001-01-01

    CERN, The European Organisation for Nuclear Research is situated near Geneva and has its accelerators and experimental facilities astride the Swiss and French frontiers attracting physicists from all over the world to this unique laboratory. The main accelerator is situated in a 27 km underground ring and the experiments take place in huge underground caverns in order to detect the fragments resulting from the collision of subatomic particles at speeds approaching that of light. These detectors contain many hundreds of tons of flammable materials, mainly plastics in cables and structural components, flammable gases in the detectors themselves, and cryogenic fluids such as helium and argon. The experiments consume high amounts of electrical power, thus the dangers involved have necessitated the use of analytical techniques to identify the hazards and quantify the risks to personnel and the infrastructure. The techniques described in the paper have been developed in the process industries where they have been to be of great value. They have been successfully applied to CERN industrial and experimental installations and, in some cases, have been instrumental in changing the philosophy of the experimentalists and their detectors.

  15. Power inverter with optical isolation

    DOEpatents

    Duncan, Paul G.; Schroeder, John Alan

    2005-12-06

    An optically isolated power electronic power conversion circuit that includes an input electrical power source, a heat pipe, a power electronic switch or plurality of interconnected power electronic switches, a mechanism for connecting the switch to the input power source, a mechanism for connecting comprising an interconnecting cable and/or bus bar or plurality of interconnecting cables and/or input bus bars, an optically isolated drive circuit connected to the switch, a heat sink assembly upon which the power electronic switch or switches is mounted, an output load, a mechanism for connecting the switch to the output load, the mechanism for connecting including an interconnecting cable and/or bus bar or plurality of interconnecting cables and/or output bus bars, at least one a fiber optic temperature sensor mounted on the heat sink assembly, at least one fiber optic current sensor mounted on the load interconnection cable and/or output bus bar, at least one fiber optic voltage sensor mounted on the load interconnection cable and/or output bus bar, at least one fiber optic current sensor mounted on the input power interconnection cable and/or input bus bar, and at least one fiber optic voltage sensor mounted on the input power interconnection cable and/or input bus bar.

  16. 30 CFR 56.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... MINES Electricity § 56.12008 Insulation and fittings for power wires and cables. Power wires and cables... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Insulation and fittings for power wires and cables. 56.12008 Section 56.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...

  17. 30 CFR 56.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... MINES Electricity § 56.12008 Insulation and fittings for power wires and cables. Power wires and cables... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Insulation and fittings for power wires and cables. 56.12008 Section 56.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...

  18. 30 CFR 56.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... MINES Electricity § 56.12008 Insulation and fittings for power wires and cables. Power wires and cables... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Insulation and fittings for power wires and cables. 56.12008 Section 56.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...

  19. 30 CFR 56.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Insulation and fittings for power wires and... MINES Electricity § 56.12008 Insulation and fittings for power wires and cables. Power wires and cables... insulated wires, other than cables, pass through metal frames, the holes shall be substantially bushed with...

  20. 30 CFR 56.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Insulation and fittings for power wires and... MINES Electricity § 56.12008 Insulation and fittings for power wires and cables. Power wires and cables... insulated wires, other than cables, pass through metal frames, the holes shall be substantially bushed with...

  1. Development of a comprehensive inventory management system for underground fiber optic conduits.

    DOT National Transportation Integrated Search

    2013-03-01

    Major State Departments of Transportation operate and maintain networks of thousands of miles of conduits, many : carrying fiber optic cables that are vital to State communication systems. These conduits are located alongside or : across highways and...

  2. 30 CFR 75.517-1 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Power wires and cables; insulation and protection. 75.517-1 Section 75.517-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...-General § 75.517-1 Power wires and cables; insulation and protection. Power wires and cables installed on...

  3. 30 CFR 75.517-1 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Power wires and cables; insulation and protection. 75.517-1 Section 75.517-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...-General § 75.517-1 Power wires and cables; insulation and protection. Power wires and cables installed on...

  4. 30 CFR 75.517-1 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Power wires and cables; insulation and protection. 75.517-1 Section 75.517-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...-General § 75.517-1 Power wires and cables; insulation and protection. Power wires and cables installed on...

  5. 30 CFR 75.517-1 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Power wires and cables; insulation and protection. 75.517-1 Section 75.517-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...-General § 75.517-1 Power wires and cables; insulation and protection. Power wires and cables installed on...

  6. 30 CFR 75.517-1 - Power wires and cables; insulation and protection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Power wires and cables; insulation and protection. 75.517-1 Section 75.517-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...-General § 75.517-1 Power wires and cables; insulation and protection. Power wires and cables installed on...

  7. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Trailing cables supplying power to low-voltage... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...

  8. 30 CFR 75.517-2 - Plans for insulation of existing bare power wires and cables.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Equipment-General § 75.517-2 Plans for insulation of existing bare power wires and cables. (a) On or before December 31, 1970, plans for the insulation of existing bare power wires and cables installed prior to... officials; (2) Map or diagram indicating location of power wires and cables required to be insulated; (3...

  9. 30 CFR 75.517-2 - Plans for insulation of existing bare power wires and cables.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Equipment-General § 75.517-2 Plans for insulation of existing bare power wires and cables. (a) On or before December 31, 1970, plans for the insulation of existing bare power wires and cables installed prior to... officials; (2) Map or diagram indicating location of power wires and cables required to be insulated; (3...

  10. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Trailing cables supplying power to low-voltage... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...

  11. 30 CFR 75.517-2 - Plans for insulation of existing bare power wires and cables.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Equipment-General § 75.517-2 Plans for insulation of existing bare power wires and cables. (a) On or before December 31, 1970, plans for the insulation of existing bare power wires and cables installed prior to... officials; (2) Map or diagram indicating location of power wires and cables required to be insulated; (3...

  12. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Trailing cables supplying power to low-voltage... Alternating Current Circuits § 77.906 Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...

  13. Measurement of low radioactivity background in a high voltage cable by high resolution inductively coupled plasma mass spectrometry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Vacri, M. L. di; Nisi, S.; Balata, M.

    2013-08-08

    The measurement of naturally occurring low level radioactivity background in a high voltage (HV) cable by high resolution inductively coupled plasma mass spectrometry (HR ICP MS) is presented in this work. The measurements were performed at the Chemistry Service of the Gran Sasso National Laboratory. The contributions to the radioactive background coming from the different components of the heterogeneous material were separated. Based on the mass fraction of the cable, the whole contamination was calculated. The HR ICP MS results were cross-checked by gamma ray spectroscopy analysis that was performed at the low background facility STELLA (Sub Terranean Low Levelmore » Assay) of the LNGS underground lab using HPGe detectors.« less

  14. Assessing potential impacts of energized submarine power cables on crab harvests

    NASA Astrophysics Data System (ADS)

    Love, Milton S.; Nishimoto, Mary M.; Clark, Scott; McCrea, Merit; Bull, Ann Scarborough

    2017-12-01

    Offshore renewable energy facilities transmit electricity to shore through submarine power cables. Electromagnetic field emissions (EMFs) are generated from the transmission of electricity through these cables, such as the AC inter-array (between unit) and AC export (to shore) cables often used in offshore energy production. The EMF has both an electric component and a magnetic component. While sheathing can block the direct electric field, the magnetic field is not blocked. A concern raised by fishermen on the Pacific Coast of North America is that commercially important Dungeness crab (Metacarcinus magister Dana, 1852)) might not cross over an energized submarine power cable to enter a baited crab trap, thus potentially reducing their catch. The presence of operating energized cables off southern California and in Puget Sound (cables that are comparable to those within the arrays of existing offshore wind energy devices) allowed us to conduct experiments on how energized power cables might affect the harvesting of both M. magister and another commercially important crab species, Cancer productus Randall, 1839. In this study we tested the questions: 1) Is the catchability of crabs reduced if these animals must traverse an energized power cable to enter a trap and 2) if crabs preferentially do not cross an energized cable, is it the cable structure or the EMF emitted from that cable that deters crabs from crossing? In field experiments off southern California and in Puget Sound, crabs were given a choice of walking over an energized power cable to a baited trap or walking directly away from that cable to a second baited trap. Based on our research we found no evidence that the EMF emitted by energized submarine power cables influenced the catchability of these two species of commercially important crabs. In addition, there was no difference in the crabs' responses to lightly buried versus unburied cables. We did observe that, regardless of the position of the cable, Cancer productus in southern California tended to move to the west and Metacarcinus magister tended to move to the east.

  15. 30 CFR 57.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... cables. Power wires and cables shall be insulated adequately where they pass into or out of electrical... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Insulation and fittings for power wires and cables. 57.12008 Section 57.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...

  16. 30 CFR 57.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... cables. Power wires and cables shall be insulated adequately where they pass into or out of electrical... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Insulation and fittings for power wires and cables. 57.12008 Section 57.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...

  17. 30 CFR 57.12008 - Insulation and fittings for power wires and cables.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... cables. Power wires and cables shall be insulated adequately where they pass into or out of electrical... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Insulation and fittings for power wires and cables. 57.12008 Section 57.12008 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF...

  18. Ames Lab 101: Reinventing the Power Cable

    ScienceCinema

    Russell, Alan

    2018-01-16

    Ames Laboratory researchers are working to develop new electrical power cables that are stronger and lighter than the cables currently used in the nation's power grid. Nano Tube animation by Iain Goodyear

  19. Feasibility study of superconducting power cables for DC electric railway feeding systems in view of thermal condition at short circuit accident

    NASA Astrophysics Data System (ADS)

    Kumagai, Daisuke; Ohsaki, Hiroyuki; Tomita, Masaru

    2016-12-01

    A superconducting power cable has merits of a high power transmission capacity, transmission losses reduction, a compactness, etc., therefore, we have been studying the feasibility of applying superconducting power cables to DC electric railway feeding systems. However, a superconducting power cable is required to be cooled down and kept at a very low temperature, so it is important to reveal its thermal and cooling characteristics. In this study, electric circuit analysis models of the system and thermal analysis models of superconducting cables were constructed and the system behaviors were simulated. We analyzed the heat generation by a short circuit accident and transient temperature distribution of the cable to estimate the value of temperature rise and the time required from the accident. From these results, we discussed a feasibility of superconducting cables for DC electric railway feeding systems. The results showed that the short circuit accident had little impact on the thermal condition of a superconducting cable in the installed system.

  20. Automated Coal-Mine Shuttle Car

    NASA Technical Reports Server (NTRS)

    Collins, E. R., Jr.

    1984-01-01

    Cable-guided car increases efficiency in underground coal mines. Unmanned vehicle contains storage batteries in side panels for driving traction motors located in wheels. Batteries recharged during inactive periods or slid out as unit and replaced by fresh battery bank. Onboard generator charges batteries as car operates.

  1. Design of power cable grounding wire anti-theft monitoring system

    NASA Astrophysics Data System (ADS)

    An, Xisheng; Lu, Peng; Wei, Niansheng; Hong, Gang

    2018-01-01

    In order to prevent the serious consequences of the power grid failure caused by the power cable grounding wire theft, this paper presents a GPRS based power cable grounding wire anti-theft monitoring device system, which includes a camera module, a sensor module, a micro processing system module, and a data monitoring center module, a mobile terminal module. Our design utilize two kinds of methods for detecting and reporting comprehensive image, it can effectively solve the problem of power and cable grounding wire box theft problem, timely follow-up grounded cable theft events, prevent the occurrence of electric field of high voltage transmission line fault, improve the reliability of the safe operation of power grid.

  2. Does EMF Emitted from In Situ Subsea Power Cables Affect the Composition of Deep Benthic Fish and Invertebrate Communities?

    NASA Astrophysics Data System (ADS)

    Bull, A. S.; Nishimoto, M.; Love, M.; Schroeder, D. M.

    2016-02-01

    A network of power cables is an important component of any offshore renewable energy generation facilities (e.g., wind and wave). The cables laid on the seafloor carry current that produces both electric and magnetic fields; the magnetic field, here called an electromagnetic field (EMF), is what is emitted from shielded cables. The cables, themselves, add hard, low-relief structure to what is typically soft-bottom habitat (mud or sand). Given that laboratory experiments show EMF can affect the behavior of some marine vertebrates and invertebrates, concern is raised over the potential ecological impacts of in situ power cables. Here we report an unusual comparative study of the effect of EMF emitted from in situ power cables on the fish and invertebrate communities of the deep coastal shelf environment. In the Santa Barbara Channel of southern California, subsea power cables, similar to those used in the offshore renewable energy industry, transmit electricity from shore to offshore oil and gas production platforms. A non-energized cable in the vicinity of energized cables afforded us the unusual opportunity to control for the effect of cable as hard, low relief habitat. We conducted three annual submersible surveys in October, 2012- 2014, at depths from 75 m to 210 m. We present results comparing observations along the energized and nonenergized cables and on the adjacent natural substrate.

  3. Transient analysis of an HTS DC power cable with an HVDC system

    NASA Astrophysics Data System (ADS)

    Dinh, Minh-Chau; Ju, Chang-Hyeon; Kim, Jin-Geun; Park, Minwon; Yu, In-Keun; Yang, Byeongmo

    2013-11-01

    The operational characteristics of a superconducting DC power cable connected to a highvoltage direct current (HVDC) system are mainly concerned with the HVDC control and protection system. To confirm how the cable operates with the HVDC system, verifications using simulation tools are needed. This paper presents a transient analysis of a high temperature superconducting (HTS) DC power cable in connection with an HVDC system. The study was conducted via the simulation of the HVDC system and a developed model of the HTS DC power cable using a real time digital simulator (RTDS). The simulation was performed with some cases of short circuits that may have caused system damage. The simulation results show that during the faults, the quench did not happen with the HTS DC power cable because the HVDC controller reduced some degree of the fault current. These results could provide useful data for the protection design of a practical HVDC and HTS DC power cable system.

  4. 47 CFR 15.213 - Cable locating equipment.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...: Within the frequency band 9 kHz, up to, but not including, 45 kHz, the peak output power from the cable... output power from the cable locating equipment shall not exceed one watt. If provisions are made for connection of the cable locating equipment to the AC power lines, the conducted limits in § 15.207 also apply...

  5. 47 CFR 15.213 - Cable locating equipment.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...: Within the frequency band 9 kHz, up to, but not including, 45 kHz, the peak output power from the cable... output power from the cable locating equipment shall not exceed one watt. If provisions are made for connection of the cable locating equipment to the AC power lines, the conducted limits in § 15.207 also apply...

  6. 47 CFR 15.213 - Cable locating equipment.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...: Within the frequency band 9 kHz, up to, but not including, 45 kHz, the peak output power from the cable... output power from the cable locating equipment shall not exceed one watt. If provisions are made for connection of the cable locating equipment to the AC power lines, the conducted limits in § 15.207 also apply...

  7. 47 CFR 15.213 - Cable locating equipment.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...: Within the frequency band 9 kHz, up to, but not including, 45 kHz, the peak output power from the cable... output power from the cable locating equipment shall not exceed one watt. If provisions are made for connection of the cable locating equipment to the AC power lines, the conducted limits in § 15.207 also apply...

  8. Power superconducting power transmission cable

    DOEpatents

    Ashworth, Stephen P.

    2003-06-10

    The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

  9. Power superconducting power transmission cable

    DOEpatents

    Ashworth, Stephen P.

    2003-01-01

    The present invention is for a compact superconducting power transmission cable operating at distribution level voltages. The superconducting cable is a conductor with a number of tapes assembled into a subconductor. These conductors are then mounted co-planarly in an elongated dielectric to produce a 3-phase cable. The arrangement increases the magnetic field parallel to the tapes thereby reducing ac losses.

  10. Study on Safety Monitoring System for Submarine Power Cable on the Basis of AIS and Radar Technology

    NASA Astrophysics Data System (ADS)

    Jie, Wang; Yao-Tian, Fan

    Through analyzing the risks of submarine power cable, the highest risk to damage the cable identified is from ship. Based on concept of Vessel Traffic Management Information Systems, the three core sub-systems of safety monitoring system for submarine power cable were studied and described, also some suggestions were given.

  11. 30 CFR Appendix I to Subpart D of... - Appendix I to Subpart D of Part 18

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... LIST OF TABLES Table No. Title 1 Portable power cable ampacities—600 volts. 2 Portable cord ampacities—600 volts. 3 Portable power cable ampacities—601 to 5,000 volts. 4 Normal diameter of round cables... diameter of three-conductor portable power cables with tolerances in inches—601 to 5,000 volts. 8 Fuse...

  12. 30 CFR Appendix I to Subpart D of... - Appendix I to Subpart D of Part 18

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... LIST OF TABLES Table No. Title 1 Portable power cable ampacities—600 volts. 2 Portable cord ampacities—600 volts. 3 Portable power cable ampacities—601 to 5,000 volts. 4 Normal diameter of round cables... diameter of three-conductor portable power cables with tolerances in inches—601 to 5,000 volts. 8 Fuse...

  13. 30 CFR 75.517-2 - Plans for insulation of existing bare power wires and cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... wires and cables. 75.517-2 Section 75.517-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Equipment-General § 75.517-2 Plans for insulation of existing bare power wires and cables. (a) On or before December 31, 1970, plans for the insulation of existing bare power wires and cables installed prior to...

  14. 30 CFR 75.517-2 - Plans for insulation of existing bare power wires and cables.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... wires and cables. 75.517-2 Section 75.517-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Equipment-General § 75.517-2 Plans for insulation of existing bare power wires and cables. (a) On or before December 31, 1970, plans for the insulation of existing bare power wires and cables installed prior to...

  15. Nondestructive Examination for Nuclear Power Plant Cable Aging Management Programs

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glass, Samuel W.; Fifield, Leonard S.

    2016-01-01

    Degradation of the cable jacket, electrical insulation, and other cable components of installed cables within nuclear power plants (NPPs) is known to occur as a function of age, temperature, radiation, and other environmental factors. System tests verify cable function under normal loads; however, the concern is over cable performance under exceptional loads associated with design-basis events (DBEs). The cable’s ability to perform safely over the initial 40 year planned and licensed life has generally been demonstrated and there have been very few age-related cable failures. With greater than 1000 km of power, control, instrumentation, and other cables typically found inmore » an NPP, replacing all the cables would be a severe cost burden. Justification for life extension to 60 and 80 years requires a cable aging management program (AMP) to justify cable performance under normal operation as well as accident conditions. This paper addresses various NDE technologies that constitute the essence of an acceptable aging management program.« less

  16. 52. View of sitdown cable car, cable way, and stream ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. View of sit-down cable car, cable way, and stream gaging station, looking southeast. Photo by Robin Lee Tedder, Puget Power, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  17. 51. View of sitdown cable car and cable way for ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. View of sit-down cable car and cable way for stream gaging, looking west. Photo by Robin Lee Tedder, Puget Power, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  18. The Bottom Line: Cable Telegraphy and the Rise of Field Theory in the Victorian British Empire

    NASA Astrophysics Data System (ADS)

    Hunt, Bruce

    The networks of telegraph wires and undersea cables that began to spread across the world in the 1840s and 1850s had far-reaching effects on commerce and the dissemination of news. They also had deep effects on electrical science. In this paper, I will argue that what might at first appear to be a prime example of pure science--the development of electromagnetic field theory in Britain in the middle decades of the 19th century--was in fact driven in important ways by developments in the telegraph industry, particularly British scientists' and engineers' encounters with puzzling new phenomenon of the `retardation' of signals that turned up on underground wires and undersea cables in the early 1850s.

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Reason, J.

    Transmission terminations available today are very reliable, but they need to be. In the field, they are continually exposed to pollution and extremes of ambient temperature. In many cases, they are in the rifle sights of vandals. In contrast, cable joints - often cited as the weakest links from an electrical viewpoint - are generally protected from physical damage underground and many of the short cable systems being installed in the US today can be built without joints. All cable systems need terminations - mostly to air-insulated equipment. At 69 through 138 kV, there is intense competition among manufacturers tomore » supply terminations for solid-dielectric cable that are low in cost, reliable, and require a minimum of skill to install. Some utilities are looking also for terminations that fit a range of cable sizes; terminations that do not contain liquid that can leak out; and terminations that are shatter-proof. All of these improvements are available in the US up to 69 kV. For higher voltages, they are on the horizon, if not already in use, overseas. 16 figs.« less

  20. Strain relief for power-cable connectors

    NASA Technical Reports Server (NTRS)

    Dean, W. T., III

    1980-01-01

    Easily fabricated grommet composed of polytetrafluoroethylene cylinder, containing U-shaped channels equally spaced around periphery, is used in power cable connectors to relieve strain on cables. Utilization of grommets provides more ease in cable insertion and removal. Potential applications include wiring in large residential and commercial buildings.

  1. SoilNet - A hybrid underground wireless sensor network for near real-time monitoring of hydrological processes

    NASA Astrophysics Data System (ADS)

    Bogena, H. R.; Huisman, S.; Rosenbaum, U.; Wuethen, A.; Vereecken, H.

    2009-04-01

    Wireless sensor network technology allows near real-time monitoring of soil properties with a high spatial and temporal resolution for observing hydrological processes in small watersheds. The novel wireless sensor network SoilNet uses the low-cost ZigBee radio network for communication and a hybrid topology with a mixture of underground end devices each wired to several soil sensors and aboveground router devices. The SoilNet sensor network consists of soil water content, salinity and temperature sensors attached to end devices by cables, router devices and a coordinator device. The end devices are buried in the soil and linked wirelessly with nearby aboveground router devices. This ZigBee network design considers channel errors, delays, packet losses, and power and topology constraints. In order to conserve battery power, a reactive routing protocol is used that determines a new route only when it is required. The sensor network is also able to react to external influences, e.g. the occurrence of precipitation. The SoilNet communicator, routing and end devices have been developed by the Forschungszentrum Juelich and will be marketed through external companies. Simultaneously, we have also developed a data management and visualisation system. Recently, a small forest catchment Wüstebach (27 ha) was instrumented with 50 end devices and more than 400 soil sensors in the frame of the TERENO-RUR hydrological observatory. We will present first results of this large sensor network both in terms of spatial-temporal variations in soil water content and the performance of the sensor network (e.g. network stability and power use).

  2. 30 CFR 75.1905-1 - Diesel fuel piping systems.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... entry as electric cables or power lines. Where it is necessary for piping systems to cross electric cables or power lines, guarding must be provided to prevent severed electrical cables or power lines near... storage facility. (h) The diesel fuel piping system must not be located in a borehole with electric power...

  3. 30 CFR 75.1905-1 - Diesel fuel piping systems.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... entry as electric cables or power lines. Where it is necessary for piping systems to cross electric cables or power lines, guarding must be provided to prevent severed electrical cables or power lines near... storage facility. (h) The diesel fuel piping system must not be located in a borehole with electric power...

  4. 77 FR 24228 - Condition Monitoring Techniques for Electric Cables Used in Nuclear Power Plants

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-23

    ... Used in Nuclear Power Plants AGENCY: Nuclear Regulatory Commission. ACTION: Regulatory guide; issuance... guide, (RG) 1.218, ``Condition Monitoring Techniques for Electric Cables Used in Nuclear Power Plants... of electric cables for nuclear power plants. RG 1.218 is not intended to be prescriptive, instead it...

  5. JPS heater and sensor lightning qualification

    NASA Technical Reports Server (NTRS)

    Cook, M.

    1989-01-01

    Simulated lightning strike testing of the Redesigned Solid Rocket Motor (RSRM) field joint protection system heater assembly was performed at Thiokol Corp., Wendover Lightning Facility. Testing consisted of subjecting the lightning evaluation test article to simulated lightning strikes and evaluating the effects of heater cable transients on cables within the systems tunnel. The maximum short circuit current coupled onto a United Space Boosters, Inc. operational flight cable within the systems tunnel, induced by transients from all cables external to the systems tunnel, was 92 amperes. The maximum open-circuit voltage coupled was 316 volts. The maximum short circuit current coupled onto a United Space Boosters, Inc. operational flight cable within the systems tunnel, induced by heater power cable transients only, was 2.7 amperes; the maximum open-circuit voltage coupled was 39 volts. All heater power cable induced coupling was due to simulated lightning discharges only, no heater operating power was applied during the test. The results showed that, for a worst-case lightning discharge, the heater power cable is responsible for a 3.9 decibel increase in voltage coupling to operational flight cables within the systems tunnel. Testing also showed that current and voltage levels coupled onto cables within the systems tunnel are partially dependant on the relative locations of the cables within the systems tunnel.

  6. Reducing Magnetic Fields Around Power Cables

    NASA Technical Reports Server (NTRS)

    Sargent, Noel B.; Gitelman, Florida; Pongracz-Bartha, Edward; Spalding, John

    1993-01-01

    Four power conductors arranged symmetrically about fifth grounded conductor. Four current-carrying wires arranged symmetrically around central grounded wire that nominally carries no current. In comparison with other cable configurations, this one results in smaller magnetic fields around cable. Technique for use when size of wires in cable makes twisting impractical.

  7. Research for the Cable Layout Way of the Bypass Operation System in Agricultural Power Supply Network

    NASA Astrophysics Data System (ADS)

    Niu, Jie; Li, Jinliang; Zou, Dehua; Yang, Qi; Li, Xu; Yan, Yu; Li, Tang

    2017-05-01

    Non-blackout working of agricultural power supply network is significant to shorten the outage time, decrease the outage loss, and improve the supply reliability and safety. It is impossible to hang the wire rope first and then suspend the cable because of the poor bearing ability of the pole in agricultural power supply network. A kind of new cable arrangement way, its matching tools and the flexible cable that can bear the tension by itself are needed to be put forward and developed. It is necessary to calculate the electric field intensity of the flexible cable to verify that the electric field intensity meets the insulation demand. In this new design, the fiber layer is added into the flexible cable and its maximum tension force is measured to reach to 4000 N. Based on the features of live working in the agricultural power supply network, the new layout way of the cable is proposed; the matching tools and the new flexible cable that can bear the tension by itself are developed as well in this paper. All of the research achievements can give references for the live working of the agricultural power supply network.

  8. Application of Superconducting Power Cables to DC Electric Railway Systems

    NASA Astrophysics Data System (ADS)

    Ohsaki, Hiroyuki; Lv, Zhen; Sekino, Masaki; Tomita, Masaru

    For novel design and efficient operation of next-generation DC electric railway systems, especially for their substantial energy saving, we have studied the feasibility of applying superconducting power cables to them. In this paper it is assumed that a superconducting power cable is applied to connect substations supplying electric power to trains. An analysis model line was described by an electric circuit, which was analyzed with MATLAB-Simulink. From the calculated voltages and currents of the circuit, the regenerative brake and the energy losses were estimated. In addition, assuming the heat loads of superconducting power cables and the cryogenic efficiency, the energy saving of the total system was evaluated. The results show that the introduction of superconducting power cables could achieve the improved use of regenerative brake, the loss reduction, the decreased number of substations, the reduced maintenance, etc.

  9. 30 CFR 75.1002 - Installation of electric equipment and conductors; permissibility.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... faces must be— (1) Shielded high-voltage cables supplying power to permissible longwall equipment; (2... intrinsically safe circuits; and (4) Cables and conductors supplying power to low- and medium-voltage permissible equipment. (5) Shielded high-voltage cables supplying power to permissible continuous mining...

  10. 30 CFR 75.1002 - Installation of electric equipment and conductors; permissibility.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... faces must be— (1) Shielded high-voltage cables supplying power to permissible longwall equipment; (2... intrinsically safe circuits; and (4) Cables and conductors supplying power to low- and medium-voltage permissible equipment. (5) Shielded high-voltage cables supplying power to permissible continuous mining...

  11. 30 CFR 75.1002 - Installation of electric equipment and conductors; permissibility.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... faces must be— (1) Shielded high-voltage cables supplying power to permissible longwall equipment; (2... intrinsically safe circuits; and (4) Cables and conductors supplying power to low- and medium-voltage permissible equipment. (5) Shielded high-voltage cables supplying power to permissible continuous mining...

  12. 30 CFR 75.1907 - Diesel-powered equipment intended for use in underground coal mines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... underground coal mines. 75.1907 Section 75.1907 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1907 Diesel-powered equipment intended for use in underground coal mines. (a) As of...

  13. 30 CFR 75.1907 - Diesel-powered equipment intended for use in underground coal mines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... underground coal mines. 75.1907 Section 75.1907 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1907 Diesel-powered equipment intended for use in underground coal mines. (a) As of...

  14. 30 CFR 75.1907 - Diesel-powered equipment intended for use in underground coal mines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... underground coal mines. 75.1907 Section 75.1907 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1907 Diesel-powered equipment intended for use in underground coal mines. (a) As of...

  15. 30 CFR 75.1907 - Diesel-powered equipment intended for use in underground coal mines.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... underground coal mines. 75.1907 Section 75.1907 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1907 Diesel-powered equipment intended for use in underground coal mines. (a) As of...

  16. 30 CFR 75.831 - Electrical work; troubleshooting and testing.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) or (2): (1) If a trailing cable disconnecting switch is provided: (i) Open and ground the power... power receptacle. (b) Troubleshooting and testing the trailing cable. During troubleshooting and testing, the de-energized high-voltage cable may be disconnected from the power center only for that period of...

  17. 30 CFR 75.831 - Electrical work; troubleshooting and testing.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ...) or (2): (1) If a trailing cable disconnecting switch is provided: (i) Open and ground the power... power receptacle. (b) Troubleshooting and testing the trailing cable. During troubleshooting and testing, the de-energized high-voltage cable may be disconnected from the power center only for that period of...

  18. 30 CFR 75.831 - Electrical work; troubleshooting and testing.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ...) or (2): (1) If a trailing cable disconnecting switch is provided: (i) Open and ground the power... power receptacle. (b) Troubleshooting and testing the trailing cable. During troubleshooting and testing, the de-energized high-voltage cable may be disconnected from the power center only for that period of...

  19. 30 CFR 75.831 - Electrical work; troubleshooting and testing.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...) or (2): (1) If a trailing cable disconnecting switch is provided: (i) Open and ground the power... power receptacle. (b) Troubleshooting and testing the trailing cable. During troubleshooting and testing, the de-energized high-voltage cable may be disconnected from the power center only for that period of...

  20. 77 FR 35306 - Airworthiness Directives; Bell Helicopter Textron, Inc. Helicopters

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-13

    ... assemblies (power cable assemblies). This proposed AD is prompted by the determination that the power cable assembly connector (connector) can deteriorate, causing a short in the connector that may lead to a fire. This AD would require replacing the power cable assemblies and their associated parts, and performing...

  1. Number of lightning discharges causing damage to lightning arrester cables for aerial transmission lines in power systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nikiforov, E. P.

    2009-07-15

    Damage by lightning discharges to lightning arrester cables for 110-175 kV aerial transmission lines is analyzed using data from power systems on incidents with aerial transmission lines over a ten year operating period (1997-2006). It is found that failures of lightning arrester cables occur when a tensile force acts on a cable heated to the melting point by a lightning current. The lightning currents required to heat a cable to this extent are greater for larger cable cross sections. The probability that a lightning discharge will develop decreases as the amplitude of the lightning current increases, which greatly reduces themore » number of lightning discharges which damage TK-70 cables compared to TK-50 cables. In order to increase the reliability of lightning arrester cables for 110 kV aerial transmission lines, TK-70 cables should be used in place of TK-50 cables. The number of lightning discharges per year which damage lightning arrester cables is lowered when the density of aerial transmission lines is reduced within the territory of electrical power systems. An approximate relationship between these two parameters is obtained.« less

  2. Cable-fault locator

    NASA Technical Reports Server (NTRS)

    Cason, R. L.; Mcstay, J. J.; Heymann, A. P., Sr.

    1979-01-01

    Inexpensive system automatically indicates location of short-circuited section of power cable. Monitor does not require that cable be disconnected from its power source or that test signals be applied. Instead, ground-current sensors are installed in manholes or at other selected locations along cable run. When fault occurs, sensors transmit information about fault location to control center. Repair crew can be sent to location and cable can be returned to service with minimum of downtime.

  3. A Marriage Proposal: Cable Television and Local Public Power.

    ERIC Educational Resources Information Center

    Schwartz, Louis; Woods, Robert A.

    Two articles reprinted from "Public Power" discuss the present state of cable television (TV), its future prospects, and the opportunities offered municipal utilities by cable TV. The proposal is that local publicly-owned electric utilities meet the requirements of the Federal Communications Commission (FCC) for cable TV ownership and have the…

  4. High-stability 48-core bendable and movable optical cable for FAST telescope optical transmission system

    NASA Astrophysics Data System (ADS)

    Liu, Hongfei; Pan, Gaofeng; Lin, Zhong; Liu, Cheng; Zhu, Wenbai; Nan, Rendong; Li, Chunsheng; Gao, Guanjun; Luo, Wenyong; Jin, Chengjin; Song, Jinyou

    2017-11-01

    The construction of FAST telescope was completed in Guizhou province of China in September 2016, and a kind of novel high-stability 48-core bendable and movable optical cable was developed and applied in analog data optical transmission system of FAST. Novel structure and selective material of this optical cable ensure high stability of optical power in the process of cables round-trip motion when telescope is tracking a radio source. The 105 times bend and stretch accelerated experiment for this optical cable was implemented, and real-time optical and RF signal power fluctuation were measured. The physical structure of optical cables after 105 times round-trip motion is in good condition; the real-time optical power attenuation fluctuation is smaller than 0.044 dB; the real-time RF power fluctuation is smaller than 0.12 dB. The optical cable developed in this letter meets the requirement of FAST and has been applied in FAST telescope.

  5. Frequency domain reflectometry NDE for aging cables in nuclear power plants

    NASA Astrophysics Data System (ADS)

    Glass, S. W.; Jones, A. M.; Fifield, L. S.; Hartman, T. S.

    2017-02-01

    Degradation of the cable jacket, electrical insulation, and other cable components of installed cables within nuclear power plants (NPPs) is known to occur as a function of age, temperature, radiation, and other environmental factors. Although system tests verify cable function under normal loads, demonstration of some cable's ability to perform under exceptional loads associated with design-basis events is essential to assuring plant integrity. The cable's ability to perform safely over the initial 40-year planned and licensed life has generally been demonstrated and there have been very few age-related cable failures. With greater than 1000 km of power, control, instrumentation, and other cables typically found in an NPP, replacing all the cables would be a severe cost burden. Justification for life extension to 60 and 80 years requires a cable aging management program that includes condition monitoring to justify cable performance under normal operation as well as accident conditions. A variety of tests are available to assess various aspects of electrical and mechanical cable performance, but none are suitable for all cable configurations nor does any single test confirm all features of interest. One particularly promising test that is beginning to be used more and more by utilities is frequency domain reflectometry (FDR). FDR is a nondestructive electrical inspection technique used to detect and localize faults in power and communication system conductors along the length of a cable from a single connection point. FDR detects discontinuities in the electrical impedance that arise due to cable splices or similar changes along the path of the conductor pair. In addition, FDR has the potential to provide sensitivity to insulation degradation by detecting small changes in impedance between the cable conductors being examined. The technique is also sensitive to cable bends, the particular lay of the cable in tray, proximity to other cable, and other factors that bear consideration when interpreting the test results. This paper examines various influences on the FDR approach and compares results of three different instruments to assess accelerated aging damage among several NPP representative cables.

  6. Small, Optically-Driven Power Source

    NASA Technical Reports Server (NTRS)

    Cockrum, Richard H.; Wang, Ke-Li J.

    1988-01-01

    Power transmitted along fiber-optic cables. Transmitted as infrared light along fiber-optic cable, converted to electricity to supply small electronic circuit. Power source and circuit remains electrically isolated from each other for safety or reduces electromagnetic interference. Array of diodes made by standard integrated-circuit techniques and packaged for mounting at end of fiber-optic cable.

  7. Reliability and Characterization of High Voltage Power Capacitors

    DTIC Science & Technology

    2014-03-01

    Cable The HVPS cable is a specialized coaxial cable that utilizes a high voltage bayonet connector. The cable itself has a voltage rating in excess...the( LabVIEW(program( GPIB( CABLE ( HVPS( HVPS( COAXIAL ( CABLE ( BNC( COAXIAL ( CABLE ( BNC( COAXIAL ( CABLE ( CAPACITOR(‘C’(DATA( CAPACITOR(‘A’(DATA( Circuit...16   F.   CABLES AND CONNECTORS ...................................................................16

  8. Hybrid modeling for dynamic analysis of cable-pulley systems with time-varying length cable and its application

    NASA Astrophysics Data System (ADS)

    Wang, Jing; Qi, Zhaohui; Wang, Gang

    2017-10-01

    The dynamic analysis of cable-pulley systems is investigated in this paper, where the time-varying length characteristic of the cable as well as the coupling motion between the cable and the pulleys are considered. The dynamic model for cable-pulley systems are presented based on the principle of virtual power. Firstly, the cubic spline interpolation is adopted for modeling the flexible cable elements and the virtual 1powers of tensile strain, inertia and gravity forces on the cable are formulated. Then, the coupled motions between the cable and the movable or fixed pulley are described by the input and output contact points, based on the no-slip assumption and the spatial description. The virtual powers of inertia, gravity and applied forces on the contact segment of the cable, the movable and fixed pulleys are formulated. In particular, the internal node degrees of freedom of spline cable elements are reduced, which results in that only the independent description parameters of the nodes connected to the pulleys are included in the final governing dynamic equations. At last, two cable-pulley lifting mechanisms are considered as demonstrative application examples where the vibration of the lifting process is investigated. The comparison with ADAMS models is given to prove the validity of the proposed method.

  9. Assessment of NDE for key indicators of aging cables in nuclear power plants - Interim status

    NASA Astrophysics Data System (ADS)

    Glass, S. W.; Ramuhalli, P.; Fifield, L. S.; Prowant, M. S.; Dib, G.; Tedeschi, J. R.; Suter, J. D.; Jones, A. M.; Good, M. S.; Pardini, A. F.; Hartman, T. S.

    2016-02-01

    Degradation of the cable jacket, electrical insulation, and other cable components of installed cables within nuclear power plants (NPPs) is known to occur as a function of age, temperature, radiation, and other environmental factors. System tests verify cable function under normal loads; however, the concern is over cable performance under exceptional loads associated with design-basis events (DBEs). The cable's ability to perform safely over the initial 40-year planned and licensed life has generally been demonstrated and there have been very few age-related cable failures. With greater than 1000 km of power, control, instrumentation, and other cables typically found in an NPP, replacing all the cables would be a severe cost burden. Justification for life extension to 60 and 80 years requires a cable aging management program to justify cable performance under normal operation as well as accident conditions. Currently the gold standard for determining cable insulation degradation is the elongation-at-break (EAB). This, however, is an ex-situ measurement and requires removal of a sample for laboratory investigation. A reliable nondestructive examination (NDE) in-situ approach is desirable to objectively determine the suitability of the cable for service. A variety of tests are available to assess various aspects of electrical and mechanical cable performance, but none of these tests are suitable for all cable configurations nor does any single test confirm all features of interest. Nevertheless, the complete collection of test possibilities offers a powerful range of tools to assure the integrity of critical cables. Licensees and regulators have settled on a practical program to justify continued operation based on condition monitoring of a lead sample set of cables where test data is tracked in a database and the required test data are continually adjusted based on plant and fleet-wide experience. As part of the Light Water Reactor Sustainability program sponsored by the U.S. Nuclear Regulatory Commission, the U.S. Department of Energy, and industry (represented by the Electric Power Research Institute), an assessment of cable NDE methods was commissioned. Technologies include both bulk electrical measurements (Tan δ, time domain reflectometry, frequency domain reflectometry (FDR), partial discharge, and other techniques) and local insulation measurement (indenter, dynamic mechanical analysis interdigital capacitance, infrared spectral measurement, etc.). This aging cable NDE program update reviews the full range of techniques but focuses on the most interesting test approaches that have a chance to be deployed in-situ, particularly including Tan δ, FDR, and ultrasound methods that have been reviewed most completely in this progress period.

  10. Operating experience with the southwire 30-meter high-temperature superconducting power cable

    NASA Astrophysics Data System (ADS)

    Stovall, J. P.; Lue, J. W.; Demko, J. A.; Fisher, P. W.; Gouge, M. J.; Hawsey, R. A.; Armstrong, J. W.; Hughey, R. L.; Lindsay, D. T.; Roden, M. L.; Sinha, U. K.; Tolbert, J. C.

    2002-05-01

    Southwire Company is operating a high-temperature superconducting (HTS) cable system at its corporate headquarters. The 30-m long, 3-phase cable system is powering three Southwire manufacturing plants and is rated at 12.4-kV, 1250-A, 60-Hz. Cooling is provided by a pressurized liquid nitrogen system operating at 70-80 K. The cables were energized on January 5, 2000 for on-line testing and operation and in April 2000 were placed into extended service. As of June 1, 2001, the HTS cables have provided 100% of the customer load for 8000 hours. The cryogenic system has been in continuous operation since November 1999. The HTS cable system has not been the cause of any power outages to the average 20 MW industrial load served by the cable. The cable has been exposed to short-circuit currents caused by load-side faults without damage. Based upon field measurements described herein, the cable critical current-a key performance parameter-remains the same and has not been affected by the hours of real-world operation, further proving the viability of this promising technology.

  11. Environmental testing and laser transmission results for ruggedized high power IR fiber cables

    NASA Astrophysics Data System (ADS)

    Busse, Lynda; Kung, Frederic; Florea, Catalin; Shaw, Brandon; Aggarwal, Ishwar; Sanghera, Jas

    2013-03-01

    We present successful results of high mid-IR laser power transmission as well as MIL-SPEC environmental testing (thermal cycling and vibration testing) of ruggedized, IR-transmitting chalcogenide glass fiber cables. The cables tested included chalcogenide fiber cables with endfaces imprinted with anti-reflective "moth eye" surfaces, whereby the reflection loss is reduced from about 17% per end to less than 3%. The cables with these moth eye surfaces also show excellent laser damage resistance.

  12. 30 CFR 75.811 - High-voltage underground equipment; grounding.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...-voltage equipment supplying power to such equipment receiving power from resistance grounded systems shall... 30 Mineral Resources 1 2010-07-01 2010-07-01 false High-voltage underground equipment; grounding... COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Underground High-Voltage...

  13. Brillouin optical fiber distributed sensor for settlement monitoring while tunneling the metro line 3 in Cairo, Egypt

    NASA Astrophysics Data System (ADS)

    Dewynter, V.; Rougeault, S.; Magne, S.; Ferdinand, P.; Vallon, F.; Avallone, L.; Vacher, E.; De Broissia, M.; Canepa, Ch.; Poulain, A.

    2009-10-01

    Safety while tunneling is one of the main challenges for underground constructions, avoiding confinement losses, which remain an important risk for public works, leading to additional delays and high insurance costs. In such applications, usual surface instrumentations cannot be set up because of high building density in many overcrowded cities. Tunnelling deals with the challenge of requiring ground surface undisturbed. One original concept proposed in the framework of the European Tunconstruct project, consists in very early settlement detection close to the tunnel vault and before any detectable effect on the surface. The adopted solution is to set-up a sensing element inserted into a directional drilling excavated above the foreseen tunnel. The methodology is based on the well known Brillouin Optical Time Domain Reflectometry (B-OTDR) in singlemode optical fibres and a special cable design dedicated to bending measurement. Two cables, based on different industrial manufacturing processes, have been developed taking into account the strain sensitivity required, the flexibility and the robustness for borehole installation, a low power attenuation and storage on a drum. Industrial prototypes have been manufactured and validated with tests in open air where settlement profiles geometry can be accurately controlled. Demonstration on job site took place on The Greater Cairo Metro Line 3 (CML3) at the beginning of 2009.

  14. Flat conductor cable commercialization project

    NASA Technical Reports Server (NTRS)

    Hogarth, P.; Wadsworth, E.

    1977-01-01

    An undercarpet flat conductor cable and a baseboard flat conductor cable system were studied for commercialization. The undercarpet system is designed for use in office and commercial buildings. It employs a flat power cable, protected by a grounded metal shield, that terminates in receptacles mounted on the floor. It is designed to interface with a flat conductor cable telephone system. The baseboard system consists of a flat power cable mounted in a plastic raceway; both the raceway and the receptacles are mounted on the surface of the baseboard. It is designed primarily for use in residential buildings, particularly for renovation and concrete and masonry construction.

  15. Thermal Conductivity in Soil: Theoretical Approach by 3D Infinite Resistance Grid Model

    NASA Astrophysics Data System (ADS)

    Changjan, A.; Intaravicha, N.

    2018-05-01

    Thermal conductivity in soil was elementary characteristic of soil that conduct heat, measured in terms of Fourier’s Law for heat conduction and useful application in many fields: such as Utilizing underground cable for transmission and distribution systems, the rate of cooling of the cable depends on the thermal properties of the soil surrounding the cable. In this paper, we investigated thermal conductivity in soil by infinite three dimensions (3D) electrical resistance circuit concept. Infinite resistance grid 3D was the grid of resistors that extends to infinity in all directions. Model of thermal conductivity in soil of this research was generated from this concept: comparison between electrical resistance and thermal resistance in soil. Finally, we investigated the analytical form of thermal conductivity in soil which helpful for engineering and science students that could exhibit education with a principle of physics that applied to real situations.

  16. Transient analysis for alternating over-current characteristics of HTSC power transmission cable

    NASA Astrophysics Data System (ADS)

    Lim, S. H.; Hwang, S. D.

    2006-10-01

    In this paper, the transient analysis for the alternating over-current distribution in case that the over-current was applied for a high-TC superconducting (HTSC) power transmission cable was performed. The transient analysis for the alternating over-current characteristics of HTSC power transmission cable with multi-layer is required to estimate the redistribution of the over-current between its conducting layers and to protect the cable system from the over-current in case that the quench in one or two layers of the HTSC power cable happens. For its transient analysis, the resistance generation of the conducting layers for the alternating over-current was reflected on its equivalent circuit, based on the resistance equation obtained by applying discrete Fourier transform (DFT) for the voltage and the current waveforms of the HTSC tape, which comprises each layer of the HTSC power transmission cable. It was confirmed through the numerical analysis on its equivalent circuit that after the current redistribution from the outermost layer into the inner layers first happened, the fast current redistribution between the inner layers developed as the amplitude of the alternating over-current increased.

  17. Thermal Insulation Performance of Flexible Piping for Use in HTS Power Cables

    NASA Technical Reports Server (NTRS)

    Fesmire, James E.; Augustynowicz, S. D.; Demko, J. A.; Thompson, Karen (Technical Monitor)

    2001-01-01

    High-temperature superconducting (HTS) cables that typically operate at temperatures below 80 K are being developed for power transmission. The practical application of HTS power cables will require the use of flexible piping to contain the cable and the liquid nitrogen coolant. A study of thermal performance of multilayer insulation (MLI) was conducted in geometries representing both rigid and flexible piping. This experimental study performed at the Cryogenics Test Laboratory of NASA Kennedy Space Center provides a framework for the development of cost-effective, efficient thermal insulation systems that will support these long-distance flexible lines containing HTS power cables. The overall thermal performance of the insulation system for a rigid configuration and for a flexible configuration, simulating a flexible HTS power cable, was determined by the steady-state liquid nitrogen boiloff method under the full range of vacuum levels. Two different cylindrically rolled material systems were tested: a standard MLI and a layered composite insulation (LCI). Comparisons of ideal MLI, MLI on rigid piping, and MLI between flexible piping are presented.

  18. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...

  19. 30 CFR 77.906 - Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Trailing cables supplying power to low-voltage mobile equipment; ground wires and ground check wires. 77.906 Section 77.906 Mineral Resources MINE... wires and ground check wires. On and after September 30, 1971, all trailing cables supplying power to...

  20. Measurement of the temperature distribution inside the power cable using distributed temperature system

    NASA Astrophysics Data System (ADS)

    Jaros, Jakub; Liner, Andrej; Papes, Martin; Vasinek, Vladimir; Mach, Veleslav; Hruby, David; Kajnar, Tomas; Perecar, Frantisek

    2015-01-01

    Nowadays, the power cables are manufactured to fulfill the following condition - the highest allowable temperature of the cable during normal operation and the maximum allowable temperature at short circuit conditions cannot exceed the condition of the maximum allowable internal temperature. The distribution of the electric current through the conductor leads to the increase of the amplitude of electrons in the crystal lattice of the cables material. The consequence of this phenomenon is the increase of friction and the increase of collisions between particles inside the material, which causes the temperature increase of the carrying elements. The temperature increase is unwanted phenomena, because it is causing losses. In extreme cases, the long-term overload leads to the cable damaging or fire. This paper deals with the temperature distribution measurement inside the power cables using distributed temperature system. With cooperation with Kabex company, the tube containing optical fibers was installed into the center of power cables. These fibers, except telecommunications purposes, can be also used as sensors in measurements carrying out with distributed temperature system. These systems use the optical fiber as a sensor and allow the continual measurement of the temperature along the whole cable in real time with spatial resolution 1 m. DTS systems are successfully deployed in temperature measurement applications in industry areas yet. These areas include construction, drainage, hot water etc. Their advantages are low cost, resistance to electromagnetic radiation and the possibility of real time monitoring at the distance of 8 km. The location of the optical fiber in the center of the power cable allows the measurement of internal distribution of the temperature during overloading the cable. This measurement method can be also used for prediction of short-circuit and its exact location.

  1. LONG TERM OPERATION ISSUES FOR ELECTRICAL CABLE SYSTEMS IN NUCLEAR POWER PLANTS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fifield, Dr Leonard S; Duckworth, Robert C; Glass III, Dr. Samuel W.

    Nuclear power plants contain hundreds of kilometers of electrical cables including cables used for power, for instrumentation, and for control. It is essential that safety-related cable systems continue to perform following a design-basis event. Wholesale replacement of electrical cables in existing plants facing licensing period renewal is both impractical and cost-prohibitive. It is therefore important to understand the long term aging of cable materials to have confidence that aged cables will perform when needed. It is equally important in support of cable aging management to develop methods to evaluate the health of installed cables and inform selective cable replacement decisions.more » The most common insulation materials for electrical cables in nuclear power plants are cross-linked polyethylene and ethylene-propylene rubber. The mechanical properties of these materials degrade over time in the presence of environmental stresses including heat, gamma irradiation, and moisture. Mechanical degradation of cable insulation beyond a certain threshold is unacceptable because it can lead to insulation cracking, exposure of energized conductors, arcing and burning or loss of the ability of the cable system to function during a design-basis accident. While thermal-, radiation-, and moisture-related degradation of polymer insulation materials has been extensively studied over the last few decades, questions remain regarding the long-term performance of cable materials in nuclear plant-specific environments. Identified knowledge gaps include an understanding of the temperature-dependence of activation energies for thermal damage and an understanding of the synergistic effects of radiation and thermal stress on polymer degradation. Many of the outstanding questions in the aging behavior of cable materials relate to the necessity of predicting long-term field degradation using accelerated aging results from the laboratory. Materials degrade faster under more extreme conditions, but extension of behavior to long term degradation under more mild conditions, such as those experienced by most installed cables in nuclear power plants, is complicated by the fact that different degradation mechanisms may be involved in extreme and mild scenarios. The discrepancy in predicted results from short term, more extreme exposure and actual results from longer term, more mild exposures can be counter intuitive. For instance, due to the attenuation of oxidation penetration in material samples rapidly aged through exposure to high temperatures, the bulk of the samples may be artificially protected from thermal aging. In another example, simultaneous exposure of cable insulation material to heat and radiation may actually lead to less damage at higher temperatures than may be observed at lower temperatures. The Light Water Reactor Sustainability program of the United States (US) Department of Energy Office (DOE) of Nuclear Energy is funding research to increase the predictive understanding of electrical cable material aging and degradation in existing nuclear power plants in support of continued safe operation of plants beyond their initial license periods. This research includes the evaluation and development of methods to assess installed cable condition.« less

  2. Space Station Freedom primary power wiring requirements

    NASA Technical Reports Server (NTRS)

    Hill, Thomas J.

    1994-01-01

    The Space Station Freedom (SSF) Program requirements are a 30 year reliable service life in low Earth orbit in hard vacuum or pressurized module service without detrimental degradation. Specific requirements are outlined in this presentation for SSF primary power and cable insulation. The primary power cable status and the WP-4 planned cable test program are also reviewed along with Rocketdyne-WP04 prime insulation candidates.

  3. Virginia Offshore Wind Technology Advancement Project (VOWTAP) DOE EE0005985 Final Technical Report Rev 1a

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pietryk, Steven

    The primary purpose of the VOWTAP was to advance the offshore wind industry in the United States (U.S.) by demonstrating innovative technologies and process solutions that would establish offshore wind as a cost-effective renewable energy resource. The VOWTAP Team proposed to design, construct, and operate a 12 megawatt (MW) offshore wind facility located approximately 27 statute miles (mi) (24 nautical miles [nm], 43 kilometers [km]) off the coast of Virginia. The proposed Project would consist of two Alstom Haliade™ 150-6 MW turbines mounted on inward battered guide structures (IBGS), a 34.5-kilovolt (kV) alternating current (AC) submarine cable interconnecting the WTGsmore » (inter-array cable), a 34.5-kV AC submarine transmission cable (export cable), and a 34.5 kV underground cable (onshore interconnection cable) that would connect the Project with existing Dominion infrastructure located in Virginia Beach, Virginia (Figure 1). Interconnection with the existing Dominion infrastructure would also require an onshore switch cabinet, a fiber optic cable, and new interconnection station to be located entirely within the boundaries of the Camp Pendleton State Military Reservation (Camp Pendleton). The VOWTAP balanced technology innovation with commercial readiness such that turbine operations were anticipated to commence by 2018. Dominion, as the leaseholder of the Virginia Wind Energy Area (WEA), anticipated leveraging lessons learned through the VOWTAP, and applying them to future commercial-scale offshore wind development.« less

  4. The Development and Demonstration of a 360m/10 kA HTS DC Power Cable

    NASA Astrophysics Data System (ADS)

    Xiao, Liye

    With the quick development of renewable energy, it is expected that the electric power from renewable energy would be the dominant one for the future power grid. Due to the specialty of the renewable energy, the HVDC power transmission would be very useful for the transmission of electric power from renewable energy. DC power cable made of High Tc Superconductor (HTS) would be a possible alternative for the construction of HVDC power transmission system. In this chapter, we report the development and demonstration of a 360 m/10 kA HTS DC power cable and the test results.

  5. The cable catapult - Putting it there and keeping it there

    NASA Technical Reports Server (NTRS)

    Forward, Robert L.; Conley, Buford R.; Stanek, Clay; Ramsey, William

    1992-01-01

    The cable catapult is the previously proposed method of using long space tethers for high speed interplanetary transport. A long conductive multistrand cable would be connected to a power supply and pointed in the desired direction. A linear motor would pull itself along the powered cable strands and launch a payload capsule toward a distant planet, where it would be caught and decelerated by another cable catapult positioned there. In this paper it is shown how cable catapults can be used to transport themselves to a distant planet and keep themselves in position near the planet despite the tendency of the payload capsule momentum transfer to push them apart.

  6. The cable catapult - Putting it there and keeping it there

    NASA Astrophysics Data System (ADS)

    Forward, Robert L.; Conley, Buford R.; Stanek, Clay; Ramsey, William

    1992-07-01

    The cable catapult is the previously proposed method of using long space tethers for high speed interplanetary transport. A long conductive multistrand cable would be connected to a power supply and pointed in the desired direction. A linear motor would pull itself along the powered cable strands and launch a payload capsule toward a distant planet, where it would be caught and decelerated by another cable catapult positioned there. In this paper it is shown how cable catapults can be used to transport themselves to a distant planet and keep themselves in position near the planet despite the tendency of the payload capsule momentum transfer to push them apart.

  7. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sarrao, J.; Kwok, W-K; Bozovic, I.

    As an energy carrier, electricity has no rival with regard to its environmental cleanliness, flexibility in interfacing with multiple production sources and end uses, and efficiency of delivery. In fact, the electric power grid was named ?the greatest engineering achievement of the 20th century? by the National Academy of Engineering. This grid, a technological marvel ingeniously knitted together from local networks growing out from cities and rural centers, may be the biggest and most complex artificial system ever built. However, the growing demand for electricity will soon challenge the grid beyond its capability, compromising its reliability through voltage fluctuations thatmore » crash digital electronics, brownouts that disable industrial processes and harm electrical equipment, and power failures like the North American blackout in 2003 and subsequent blackouts in London, Scandinavia, and Italy in the same year. The North American blackout affected 50 million people and caused approximately $6 billion in economic damage over the four days of its duration. Superconductivity offers powerful new opportunities for restoring the reliability of the power grid and increasing its capacity and efficiency. Superconductors are capable of carrying current without loss, making the parts of the grid they replace dramatically more efficient. Superconducting wires carry up to five times the current carried by copper wires that have the same cross section, thereby providing ample capacity for future expansion while requiring no increase in the number of overhead access lines or underground conduits. Their use is especially attractive in urban areas, where replacing copper with superconductors in power-saturated underground conduits avoids expensive new underground construction. Superconducting transformers cut the volume, weight, and losses of conventional transformers by a factor of two and do not require the contaminating and flammable transformer oils that violate urban safety codes. Unlike traditional grid technology, superconducting fault current limiters are smart. They increase their resistance abruptly in response to overcurrents from faults in the system, thus limiting the overcurrents and protecting the grid from damage. They react fast in both triggering and automatically resetting after the overload is cleared, providing a new, self-healing feature that enhances grid reliability. Superconducting reactive power regulators further enhance reliability by instantaneously adjusting reactive power for maximum efficiency and stability in a compact and economic package that is easily sited in urban grids. Not only do superconducting motors and generators cut losses, weight, and volume by a factor of two, but they are also much more tolerant of voltage sag, frequency instabilities, and reactive power fluctuations than their conventional counterparts. The challenge facing the electricity grid to provide abundant, reliable power will soon grow to crisis proportions. Continuing urbanization remains the dominant historic demographic trend in the United States and in the world. By 2030, nearly 90% of the U.S. population will reside in cities and suburbs, where increasingly strict permitting requirements preclude bringing in additional overhead access lines, underground cables are saturated, and growth in power demand is highest. The power grid has never faced a challenge so great or so critical to our future productivity, economic growth, and quality of life. Incremental advances in existing grid technology are not capable of solving the urban power bottleneck. Revolutionary new solutions are needed ? the kind that come only from superconductivity.« less

  8. Fiber optic sensors for nuclear power plant applications

    NASA Astrophysics Data System (ADS)

    Kasinathan, Murugesan; Sosamma, Samuel; BabuRao, Chelamchala; Murali, Nagarajan; Jayakumar, Tammana

    2012-05-01

    Studies have been carried out for application of Raman Distributed Temperature Sensor (RDTS) in Nuclear Power Plants (NPP). The high temperature monitoring in sodium circuits of Fast Breeder Reactor (FBR) is important. It is demonstrated that RDTS can be usefully employed in monitoring sodium circuits and in tracking the percolating sodium in the surrounding insulation in case of any leak. Aluminum Conductor Steel Reinforced (ACSR) cable is commonly used as overhead power transmission cable in power grid. The suitability of RDTS for detecting defects in ACSR overhead power cable, is also demonstrated.

  9. Noise propagation effects in power supply distribution systems for high-energy physics experiments

    NASA Astrophysics Data System (ADS)

    Arteche, F.; Rivetta, C.; Iglesias, M.; Echeverria, I.; Pradas, A.; Arcega, F. J.

    2017-12-01

    High-energy physics experiments are supplied by thousands of power supply units placed in distant areas from the front-end electronics. The power supply units and the front-end electronics are connected through long power cables that propagate the output noise from the power supplies to the detector. This paper addresses the effect of long cables on the noise propagation and the impact that those cables have on the conducted emission levels required for the power supplies and the selection of EMI filters for the front-end electronic low-voltage input. This analysis is part of the electromagnetic compatibility based design focused on functional safety to define the type of cable, shield connections, EMI filters and power supply specifications required to ensure the successful integration of the detector and, specifically, to achieve the designed performance of the front-end electronics.

  10. Noise propagation effects in power supply distribution systems for high-energy physics experiments

    DOE PAGES

    Arteche, F.; Rivetta, C.; Iglesias, M.; ...

    2017-12-05

    High-energy physics experiments are supplied by thousands of power supply units placed in distant areas from the front-end electronics. The power supply units and the front-end electronics are connected through long power cables that propagate the output noise from the power supplies to the detector. Here, this paper addresses the effect of long cables on the noise propagation and the impact that those cables have on the conducted emission levels required for the power supplies and the selection of EMI filters for the front-end electronic low-voltage input. Lastly, this analysis is part of the electromagnetic compatibility based design focused onmore » functional safety to define the type of cable, shield connections, EMI filters and power supply specifications required to ensure the successful integration of the detector and, specifically, to achieve the designed performance of the front-end electronics.« less

  11. Noise propagation effects in power supply distribution systems for high-energy physics experiments

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Arteche, F.; Rivetta, C.; Iglesias, M.

    High-energy physics experiments are supplied by thousands of power supply units placed in distant areas from the front-end electronics. The power supply units and the front-end electronics are connected through long power cables that propagate the output noise from the power supplies to the detector. Here, this paper addresses the effect of long cables on the noise propagation and the impact that those cables have on the conducted emission levels required for the power supplies and the selection of EMI filters for the front-end electronic low-voltage input. Lastly, this analysis is part of the electromagnetic compatibility based design focused onmore » functional safety to define the type of cable, shield connections, EMI filters and power supply specifications required to ensure the successful integration of the detector and, specifically, to achieve the designed performance of the front-end electronics.« less

  12. Noise propagation issues in Belle II pixel detector power cable

    NASA Astrophysics Data System (ADS)

    Iglesias, M.; Arteche, F.; Echeverria, I.; Pradas, A.; Rivetta, C.; Moser, H.-G.; Kiesling, C.; Rummel, S.; Arcega, F. J.

    2018-04-01

    The vertex detector used in the upgrade of High-Energy physics experiment Belle II includes DEPFET pixel detector (PXD) technology. In this complex topology the power supply units and the front-end electronics are connected through a PXD power cable bundle which may propagate the output noise from the power supplies to the vertex area. This paper presents a study of the propagation of noise caused by power converters in the PXD cable bundle based on Multi-conductor Transmission Line (MTL) theory. The work exposes the effect of the complex cable topology and shield connections on the noise propagation, which has an impact on the requirements of the power supplies. This analysis is part of the electromagnetic compatibility based design focused on functional safety to define the shield connections and power supply specifications required to ensure the successful integration of the detector and, specifically, to achieve the designed performance of the front-end electronics.

  13. 46 CFR 169.686 - Shore power.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... requirements: (a) A shore power connection box or receptacle and a cable connecting this box or receptacle to... power cable must be provided with a disconnect means located on or near the main distribution panel...

  14. 77 FR 34876 - Airworthiness Directives; The Boeing Company

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... (a flammable fluid leakage zone) or heat damage to the APU power feeder cable, insulation blankets... heat damage to the APU power feeder cable, insulation blankets, or pressure bulkhead. Relevant Service... feeder cable and heat damage of the insulation blanket adjacent to the clamp, a detailed inspection for...

  15. Elastic guided wave propagation in electrical cables.

    PubMed

    Mateo, Carlos; Talavera, Juan A; Muñoz, Antonio

    2007-07-01

    This article analyzes the propagation modes of ultrasound waves inside an electrical cable in order to assess its behavior as an acoustic transmission channel. A theoretical model for propagation of elastic waves in electric power cables is presented. The power cables are represented as viscoelastic-layered cylindrical structures with a copper core and a dielectric cover. The model equations then have been applied and numerically resolved for this and other known structures such as solid and hollow cylinders. The results are compared with available data from other models. Several experimental measures were carried out and were compared with results from the numerical simulations. Experimental and simulated results showed a significant difference between elastic wave attenuation inside standard versus bare, low-voltage power cables.

  16. Technical Challenges and Potential Solutions for Cross-Country Multi-Terminal Superconducting DC Power Cables

    NASA Astrophysics Data System (ADS)

    Al-Taie, A.; Graber, L.; Pamidi, S. V.

    2017-12-01

    Opportunities for applications of high temperature superconducting (HTS) DC power cables for long distance power transmission in increasing the reliability of the electric power grid and to enable easier integration of distributed renewable sources into the grid are discussed. The gaps in the technology developments both in the superconducting cable designs and cryogenic systems as well as power electronic devices are identified. Various technology components in multi-terminal high voltage DC power transmission networks and the available options are discussed. The potential of ongoing efforts in the development of superconducting DC transmission systems is discussed.

  17. Numerical modelling of effective thermal conductivity for modified geomaterial using lattice element method

    NASA Astrophysics Data System (ADS)

    Rizvi, Zarghaam Haider; Shrestha, Dinesh; Sattari, Amir S.; Wuttke, Frank

    2018-02-01

    Macroscopic parameters such as effective thermal conductivity (ETC) is an important parameter which is affected by micro and meso level behaviour of particulate materials, and has been extensively examined in the past decades. In this paper, a new lattice based numerical model is developed to predict the ETC of sand and modified high thermal backfill material for energy transportation used for underground power cables. 2D and 3D simulations are performed to analyse and detect differences resulting from model simplification. The thermal conductivity of the granular mixture is determined numerically considering the volume and the shape of the each constituting portion. The new numerical method is validated with transient needle measurements and the existing theoretical and semi empirical models for thermal conductivity prediction sand and the modified backfill material for dry condition. The numerical prediction and the measured values are in agreement to a large extent.

  18. City Safaris. A Sierra Club Explorer's Guide to Urban Adventures for Grownups and Kids.

    ERIC Educational Resources Information Center

    Shaffer, Carolyn; Fielder, Erica

    Most people think of nature in the city as parks and zoos and dandelions pushing up through cracks in the sidewalk, but it is also asphalt streets, granite office buildings and mazes of underground pipes and cables. The materials of which the streets and buildings are constructed began as prehistoric jungles and ancient mountains. The systems that…

  19. Distributed condition monitoring techniques of optical fiber composite power cable in smart grid

    NASA Astrophysics Data System (ADS)

    Sun, Zhihui; Liu, Yuan; Wang, Chang; Liu, Tongyu

    2011-11-01

    Optical fiber composite power cable such as optical phase conductor (OPPC) is significant for the development of smart grid. This paper discusses the distributed cable condition monitoring techniques of the OPPC, which adopts embedded single-mode fiber as the sensing medium. By applying optical time domain reflection and laser Raman scattering, high-resolution spatial positioning and high-precision distributed temperature measurement is executed. And the OPPC cable condition parameters including temperature and its location, current carrying capacity, and location of fracture and loss can be monitored online. OPPC cable distributed condition monitoring experimental system is set up, and the main parts including pulsed fiber laser, weak Raman signal reception, high speed acquisition and cumulative average processing, temperature demodulation and current carrying capacity analysis are introduced. The distributed cable condition monitoring techniques of the OPPC is significant for power transmission management and security.

  20. Improving Legacy Aircraft Systems Through Condition-Based Maintenance: An H-60 Case Study

    DTIC Science & Technology

    2014-09-01

    level functions. These decompositions are equivalent to a detailed design effort in systems engineering. NAMPSOPs have a common architectural structure...Assembly Power Available Spindle Cables No.1 Engine Load Demand Spindle Control Cables Engine Pneumatic Starters Auxiliary Power Unit IRCM FLIR Mission...Analysis Fuel System Main Rotor Head Main Module Main Gear Box Radiator Engine Output Shaft Auxiliary Power Unit Flight Control Cables Tail Landing

  1. Potential Impact of Submarine Power Cables on Crab Harvest

    NASA Astrophysics Data System (ADS)

    Bull, A. S.; Nishimoto, M.

    2016-02-01

    Offshore renewable energy installations convert wave or wind energy to electricity and transfer the power to shore through transmission cables laid on or buried beneath the seafloor. West coast commercial fishermen, who harvest the highly prized Dungeness crab (Metacarcinus magister) and the rock crab (Cancer spp.), are concerned that the interface of crabs and electromagnetic fields (EMF) from these cables will present an electrified fence on the seafloor that their target resource will not cross. Combined with the assistance of professional fishermen, submarine transmission cables that electrify island communities and offshore oil platforms in the eastern Pacific provide an opportunity to test the harvest of crab species across power transmission cables. In situ field techniques give commercial crab species a choice to decide if they will cross fully energized, EMF emitting, power transmission cables, in response to baited traps. Each independent trial is either one of two possible responses: the crab crosses the cable to enter a trap (1) or the crab does not cross the cable to enter a trap (0). Conditions vary among sample units by the following categorical, fixed factors (i.e., covariates) of cable structure (buried or unburied); direction of cable from crab position (west or east, north or south); time and season. A generalized linear model is fit to the data to determine whether any of these factors affect the probability of crabs crossing an energized cable to enter baited traps. Additionally, the experimental design, aside from the number of runs (set of sample trials) and the dates of the runs, is the same in the Santa Barbara Channel for rock crab and Puget Sound for Dungeness crab, and allows us to compare the capture rates of the two species in the two areas. We present preliminary results from field testing in 2015.

  2. Technical feasibility of an ROV with on-board power

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sayer, P.; Bo, L.

    1994-12-31

    An ROI`s electric power, control and communication signals are supplied from a surface ship or platform through an umbilical cable. Though cable design has evolved steadily, there are still severe limitations such as heavy weight and cost. It is well known that the drag imposed by the cable limits the operational range of the ROV in deep water. On the other hand, a cable-free AUV presents problems in control, communication and transmission of data. Therefore, an ROV with on-board and small-diameter cable could offer both a large operating range (footprint) and real-time control. This paper considers the feasibility of suchmore » an ROV with on-board power, namely a Self-Powered ROV (SPROV). The selection of possible power sources is first discussed before comparing the operational performance of an SPROV against a conventional ROV. It is demonstrated how an SPROV with a 5mm diameter tether offers a promising way forward, with on-board power of up to 40 kW over 24 hours. In water depths greater than 50m the reduced drag of the SPROV tether is very advantageous.« less

  3. Frequency Domain Reflectometry Modeling and Measurement for Nondestructive Evaluation of Nuclear Power Plant Cables

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glass, Samuel W.; Fifield, Leonard S.; Jones, Anthony M.

    Cable insulation polymers are among the more susceptible materials to age-related degradation within a nuclear power plant. This is recognized by both regulators and utilities, so all plants have developed cable aging management programs to detect damage before critical component failure in compliance with regulatory guidelines. Although a wide range of tools are available to evaluate cables and cable systems, cable aging management programs vary in how condition monitoring and NDE is conducted as utilities search for the most reliable and cost-effective ways to assess cable system condition. Frequency domain reflectometry (FDR) is emerging as one valuable tool to locatemore » and assess damaged portions of a cable system with minimal cost and only requires access in most cases to one of the cable terminal ends. This work examines a physics-based model of a cable system and relates it to FDR measurements for a better understanding of specific damage influences on defect detectability.« less

  4. Multisensor system for tunnel inspection

    NASA Astrophysics Data System (ADS)

    Idoux, Maurice

    2005-01-01

    The system is aimed at assisting inspection and monitoring of the degradation of tunnels in order to minimize maintenance and repair time. ATLAS 70 is a complete sensors/software package which enables thorough diagnosis of tunnel wall conditions. The data collected locally are stored on a computer hard disk for subsequent analysis in a remote location via elaborate dedicated software. The sensors and local computer are loaded onto a rail and/or road vehicle of specific design, i.e. with even travelling speed of 2 to 5 km/h. Originally, the system has been developed for the Paris Underground Company and has since been applied to rail and road tunnels, large town sewage systems, clean water underground aqueducts and electric cable tunnels.

  5. 29 CFR 1918.64 - Powered conveyors.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the brakes cannot be released until power is applied and the brakes are automatically engaged if the... provided for use in an emergency. Whenever the operation of any power conveyor requires personnel to work... the trimmer. (e) Grain trimmer power cable. Power cables between the deck control box and the grain...

  6. Structural considerations for underground nuclear power plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sarne, Y.

    The advantages and disadvantages of underground nuclear power plants are briefly reviewed. The impact of underground contruction on plant layout and structural design are discussed. Schedules and costs for construction are compared with those for conventional plants.

  7. System and method for sub-sea cable termination

    DOEpatents

    Chen, Qin; Yin, Weijun; Zhang, Lili

    2016-04-05

    An electrical connector includes a first cable termination chamber configured to receive a first power cable having at least a first conductor sheathed at least in part by a first insulating layer and a first insulation screen layer. Also, the electrical connector includes a first non-linear resistive layer configured to be coupled to a portion of the first conductor unsheathed by at least the first insulation screen layer and configured to control a direct current electric field generated in the first cable termination chamber. In addition, the electrical connector includes a first deflector configured to be coupled to the first power cable and control an alternating current electric field generated in the first cable termination chamber.

  8. 46 CFR 28.370 - Wiring methods and materials.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... that affects one cable does not affect the other. (d) Cable and wire for power and lighting circuits... Operate With More Than 16 Individuals on Board § 28.370 Wiring methods and materials. (a) All cable and... circuit. (b) Each conductor must be No. 22 AWG or larger. Conductors in power and lighting circuits must...

  9. 46 CFR 28.370 - Wiring methods and materials.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... that affects one cable does not affect the other. (d) Cable and wire for power and lighting circuits... Operate With More Than 16 Individuals on Board § 28.370 Wiring methods and materials. (a) All cable and... circuit. (b) Each conductor must be No. 22 AWG or larger. Conductors in power and lighting circuits must...

  10. 46 CFR 28.370 - Wiring methods and materials.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... that affects one cable does not affect the other. (d) Cable and wire for power and lighting circuits... Operate With More Than 16 Individuals on Board § 28.370 Wiring methods and materials. (a) All cable and... circuit. (b) Each conductor must be No. 22 AWG or larger. Conductors in power and lighting circuits must...

  11. 30 CFR 7.402 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... wires not insulated from one another, suitable for carrying an electric current. Electric Cable. An assembly of one or more insulated conductors of electric current under a common or integral jacket. A cable... the primary electric current or power is transmitted. Signaling Cable. A fiber optic cable, or a cable...

  12. 30 CFR 7.402 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... wires not insulated from one another, suitable for carrying an electric current. Electric Cable. An assembly of one or more insulated conductors of electric current under a common or integral jacket. A cable... the primary electric current or power is transmitted. Signaling Cable. A fiber optic cable, or a cable...

  13. 30 CFR 7.402 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... wires not insulated from one another, suitable for carrying an electric current. Electric Cable. An assembly of one or more insulated conductors of electric current under a common or integral jacket. A cable... the primary electric current or power is transmitted. Signaling Cable. A fiber optic cable, or a cable...

  14. A GIS Based 3D Online Decision Assistance System for Underground Energy Storage in Northern Germany

    NASA Astrophysics Data System (ADS)

    Nolde, M.; Schwanebeck, M.; Biniyaz, E.; Duttmann, R.

    2014-12-01

    We would like to present a GIS-based 3D online decision assistance system for underground energy storage. Its aim is to support the local land use planning authorities through pre-selection of possible sites for thermal, electrical and substantial underground energy storages. Since the extension of renewable energies has become legal requirement in Germany, the underground storing of superfluously produced green energy (such as during a heavy wind event) in the form of compressed air, gas or heated water has become increasingly important. However, the selection of suitable sites is a complex task. The assistance system uses data of geological features such as rock layers, salt caverns and faults enriched with attribute data such as rock porosity and permeability. This information is combined with surface data of the existing energy infrastructure, such as locations of wind and biogas stations, power line arrangement and cable capacity, and energy distribution stations. Furthermore, legal obligations such as protected areas on the surface and current underground mining permissions are used for the decision finding process. Not only the current situation but also prospective scenarios, such as expected growth in produced amount of energy are incorporated in the system. The decision process is carried out via the 'Analytic Hierarchy Process' (AHP) methodology of the 'Multi Object Decision Making' (MODM) approach. While the process itself is completely automated, the user has full control of the weighting of the different factors via the web interface. The system is implemented as an online 3D server GIS environment, with no software needed to be installed on the user side. The results are visualized as interactive 3d graphics. The implementation of the assistance system is based exclusively on free and open source software, and utilizes the 'Python' programming language in combination with current web technologies, such as 'HTML5', 'CSS3' and 'JavaScript'. It is developed at Kiel University for the federal state of Schleswig-Holstein in northern Germany. This work is part of project 'ANGUS+', lead by Prof. Dr. Sebastian Bauer and funded by the German Ministry for Education and Research (BMBF).

  15. 47 CFR 76.611 - Cable television basic signal leakage performance criteria.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... average power level of the strongest cable television carrier on the system. (c) In paragraph (a)(1) and... 47 Telecommunication 4 2014-10-01 2014-10-01 false Cable television basic signal leakage...) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Technical Standards § 76.611 Cable...

  16. 47 CFR 76.611 - Cable television basic signal leakage performance criteria.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... average power level of the strongest cable television carrier on the system. (c) In paragraph (a)(1) and... 47 Telecommunication 4 2013-10-01 2013-10-01 false Cable television basic signal leakage...) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Technical Standards § 76.611 Cable...

  17. 47 CFR 76.611 - Cable television basic signal leakage performance criteria.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... average power level of the strongest cable television carrier on the system. (c) In paragraph (a)(1) and... 47 Telecommunication 4 2012-10-01 2012-10-01 false Cable television basic signal leakage...) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Technical Standards § 76.611 Cable...

  18. Cable Television, Market Power and Regulation.

    ERIC Educational Resources Information Center

    Thorpe, Kenneth E.

    The goals of this dissertation are to provide an empirical examination of the impact of competing technologies on cable television firms and to document existing pricing behavior in the cable and pay programming industry. The introduction provides a brief overview of the cable television industry, including the impact of cable on federal policy…

  19. 85. INCLINED PLANE 7 EAST. FLUME AND STONE POWER HOUSE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    85. INCLINED PLANE 7 EAST. FLUME AND STONE POWER HOUSE ARE ON RIGHT SIDE OF PHOTOGRAPH. NOTE THE CABLE LEAVING THE POWER HOUSE. THIS CABLE IS ATTATCHED TO A DRUM ON THE INSIDE THE POWER HOUSE WHICH IS TURNED BY MEANS OF A WATER POWERED TURBINE. - Morris Canal, Phillipsburg, Warren County, NJ

  20. Visible-Near Infrared (VNIR) and Shortwave Infrared (SWIR) Spectral Variability of Urban Materials

    DTIC Science & Technology

    2013-03-01

    extension). FieldSpec 4 spectrometer unit is contained in the backpack. The fiber optic cable and power cable for the contact probe are seen...spectroradiometer foreoptic (lens) is typically between 1 degree and 25 degrees when using natural lighting (or artificially lit in lab) but a bare fiber ... fiber optic cable and power cable for the contact probe are seen. In operation, the spectrometer is allowed to warm up prior to use for at least 30

  1. 30 CFR 7.407 - Test for flame resistance of electric cables and cable splices.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... midpoint of the splice. The specimen shall be free from external air currents during testing. (5) Adjust... persistence of yellow coloration. (6) Connect all power conductors of the test specimen to the current source. The connections shall be secure and compatible with the size of the cable's power conductors in order...

  2. 30 CFR 7.407 - Test for flame resistance of electric cables and cable splices.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... midpoint of the splice. The specimen shall be free from external air currents during testing. (5) Adjust... persistence of yellow coloration. (6) Connect all power conductors of the test specimen to the current source. The connections shall be secure and compatible with the size of the cable's power conductors in order...

  3. Total Magnetic Field Signatures over Submarine HVDC Power Cables

    NASA Astrophysics Data System (ADS)

    Johnson, R. M.; Tchernychev, M.; Johnston, J. M.; Tryggestad, J.

    2013-12-01

    Mikhail Tchernychev, Geometrics, Inc. Ross Johnson, Geometrics, Inc. Jeff Johnston, Geometrics, Inc. High Voltage Direct Current (HVDC) technology is widely used to transmit electrical power over considerable distances using submarine cables. The most commonly known examples are the HVDC cable between Italy and Greece (160 km), Victoria-Tasmania (300 km), New Jersey - Long Island (82 km) and the Transbay cable (Pittsburg, California - San-Francisco). These cables are inspected periodically and their location and burial depth verified. This inspection applies to live and idle cables; in particular a survey company could be required to locate pieces of a dead cable for subsequent removal from the sea floor. Most HVDC cables produce a constant magnetic field; therefore one of the possible survey tools would be Marine Total Field Magnetometer. We present mathematical expressions of the expected magnetic fields and compare them with fields observed during actual surveys. We also compare these anomalies fields with magnetic fields produced by other long objects, such as submarine pipelines The data processing techniques are discussed. There include the use of Analytic Signal and direct modeling of Total Magnetic Field. The Analytic Signal analysis can be adapted using ground truth where available, but the total field allows better discrimination of the cable parameters, in particular to distinguish between live and idle cable. Use of a Transverse Gradiometer (TVG) allows for easy discrimination between cable and pipe line objects. Considerable magnetic gradient is present in the case of a pipeline whereas there is less gradient for the DC power cable. Thus the TVG is used to validate assumptions made during the data interpretation process. Data obtained during the TVG surveys suggest that the magnetic field of a live HVDC cable is described by an expression for two infinite long wires carrying current in opposite directions.

  4. Noise propagation issues in Belle II pixel detector power cable

    DOE PAGES

    Iglesias, M.; Arteche, F.; Echeverria, I.; ...

    2018-04-26

    The vertex detector used in the upgrade of High-Energy physics experiment Belle II includes DEPFET pixel detector (PXD) technology. In this complex topology the power supply units and the front-end electronics are connected through a PXD power cable bundle which may propagate the output noise from the power supplies to the vertex area. This article presents a study of the propagation of noise caused by power converters in the PXD cable bundle based on Multi-conductor Transmission Line (MTL) theory. The work exposes the effect of the complex cable topology and shield connections on the noise propagation, which has an impactmore » on the requirements of the power supplies. This analysis is part of the electromagnetic compatibility based design focused on functional safety to define the shield connections and power supply specifications required to ensure the successful integration of the detector and, specifically, to achieve the designed performance of the front-end electronics.« less

  5. Noise propagation issues in Belle II pixel detector power cable

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Iglesias, M.; Arteche, F.; Echeverria, I.

    The vertex detector used in the upgrade of High-Energy physics experiment Belle II includes DEPFET pixel detector (PXD) technology. In this complex topology the power supply units and the front-end electronics are connected through a PXD power cable bundle which may propagate the output noise from the power supplies to the vertex area. This article presents a study of the propagation of noise caused by power converters in the PXD cable bundle based on Multi-conductor Transmission Line (MTL) theory. The work exposes the effect of the complex cable topology and shield connections on the noise propagation, which has an impactmore » on the requirements of the power supplies. This analysis is part of the electromagnetic compatibility based design focused on functional safety to define the shield connections and power supply specifications required to ensure the successful integration of the detector and, specifically, to achieve the designed performance of the front-end electronics.« less

  6. Mitigation of Manhole Events Caused by Secondary Cable Failure

    NASA Astrophysics Data System (ADS)

    Zhang, Lili

    "Manhole event" refers to a range of phenomena, such as smokers, fires and explosions which occur on underground electrical infrastructure, primarily in major cities. The most common cause of manhole events is decomposition of secondary cable initiated by an electric fault. The work presented in this thesis addresses various aspects related to the evolution and mitigation of the manhole events caused by secondary cable insulation failure. Manhole events develop as a result of thermal decomposition of organic materials present in the cable duct and manholes. Polymer characterization techniques are applied to intensively study the materials properties as related to manhole events, mainly the thermal decomposition behaviors of the polymers present in the cable duct. Though evolved gas analysis, the combustible gases have been quantitatively identified. Based on analysis and knowledge of field conditions, manhole events is divided into at least two classes, those in which exothermic chemical reactions dominate and those in which electrical energy dominates. The more common form of manhole event is driven by air flow down the duct. Numerical modeling of smolder propagation in the cable duct demonstrated that limiting air flow is effective in reducing the generation rate of combustible gas, in other words, limiting manhole events to relatively minor "smokers". Besides manhole events, another by-product of secondary cable insulation breakdown is stray voltage. The danger to personnel due to stray voltage is mostly caused by the 'step potential'. The amplitude of step potential as a result of various types of insulation defects is calculated using Finite Element Analysis (FEA) program.

  7. A wireless smart sensor network for automated monitoring of cable tension

    NASA Astrophysics Data System (ADS)

    Sim, Sung-Han; Li, Jian; Jo, Hongki; Park, Jong-Woong; Cho, Soojin; Spencer, Billie F., Jr.; Jung, Hyung-Jo

    2014-02-01

    As cables are primary load carrying members in cable-stayed bridges, monitoring the tension forces of the cables provides valuable information regarding structural soundness. Incorporating wireless smart sensors with vibration-based tension estimation methods provides an efficient means of autonomous long-term monitoring of cable tensions. This study develops a wireless cable tension monitoring system using MEMSIC’s Imote2 smart sensors. The monitoring system features autonomous operation, sustainable energy harvesting and power consumption, and remote access using the internet. To obtain the tension force, an in-network data processing strategy associated with the vibration-based tension estimation method is implemented on the Imote2-based sensor network, significantly reducing the wireless data transmission and the power consumption. The proposed monitoring system has been deployed and validated on the Jindo Bridge, a cable-stayed bridge located in South Korea.

  8. Advanced technologies for maintenance of electrical systems and equipment at the Savannah River Site Defense Waste Processing Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Husler, R.O.; Weir, T.J.

    1991-01-01

    An enhanced maintenance program is being established to characterize and monitor cables, components, and process response at the Savannah River Site, Defense Waste Processing Facility. This facility was designed and constructed to immobilize the radioactive waste currently stored in underground storage tanks and is expected to begin operation in 1993. The plant is initiating the program to baseline and monitor instrument and control (I C) and electrical equipment, remote process equipment, embedded instrument and control cables, and in-cell jumper cables used in the facility. This program is based on the electronic characterization and diagnostic (ECAD) system which was modified tomore » include process response analysis and to meet rigid Department of Energy equipment requirements. The system consists of computer-automated, state-of-the-art electronics. The data that are gathered are stored in a computerized database for analysis, trending, and troubleshooting. It is anticipated that the data which are gathered and trended will aid in life extension for the facility.« less

  9. Advanced technologies for maintenance of electrical systems and equipment at the Savannah River Site Defense Waste Processing Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Husler, R.O.; Weir, T.J.

    1991-12-31

    An enhanced maintenance program is being established to characterize and monitor cables, components, and process response at the Savannah River Site, Defense Waste Processing Facility. This facility was designed and constructed to immobilize the radioactive waste currently stored in underground storage tanks and is expected to begin operation in 1993. The plant is initiating the program to baseline and monitor instrument and control (I&C) and electrical equipment, remote process equipment, embedded instrument and control cables, and in-cell jumper cables used in the facility. This program is based on the electronic characterization and diagnostic (ECAD) system which was modified to includemore » process response analysis and to meet rigid Department of Energy equipment requirements. The system consists of computer-automated, state-of-the-art electronics. The data that are gathered are stored in a computerized database for analysis, trending, and troubleshooting. It is anticipated that the data which are gathered and trended will aid in life extension for the facility.« less

  10. Probabilistic models to estimate fire-induced cable damage at nuclear power plants

    NASA Astrophysics Data System (ADS)

    Valbuena, Genebelin R.

    Even though numerous PRAs have shown that fire can be a major contributor to nuclear power plant risk, there are some specific areas of knowledge related to this issue, such as the prediction of fire-induced damage to electrical cables and circuits, and their potential effects in the safety of the nuclear power plant, that still constitute a practical enigma, particularly for the lack of approaches/models to perform consistent and objective assessments. This report contains a discussion of three different models to estimate fire-induced cable damage likelihood given a specified fire profile: the kinetic, the heat transfer and the IR "K Factor" model. These models not only are based on statistical analysis of data available in the open literature, but to the greatest extent possible they use physics based principles to describe the underlying mechanism of failures that take place among the electrical cables upon heating due to external fires. The characterization of cable damage, and consequently the loss of functionality of electrical cables in fire is a complex phenomenon that depends on a variety of intrinsic factors such as cable materials and dimensions, and extrinsic factors such as electrical and mechanical loads on the cables, heat flux severity, and exposure time. Some of these factors are difficult to estimate even in a well-characterized fire, not only for the variability related to the unknown material composition and physical arrangements, but also for the lack of objective frameworks and theoretical models to study the behavior of polymeric wire cable insulation under dynamic external thermal insults. The results of this research will (1) help to develop a consistent framework to predict fire-induced cable failure modes likelihood, and (2) develop some guidance to evaluate and/or reduce the risk associated with these failure modes in existing and new power plant facilities. Among the models evaluated, the physics-based heat transfer model takes into account the properties and characteristics of the cables and cable materials, and the characteristics of the thermal insult. This model can be used to estimate the probability of cable damage under different thermal conditions.

  11. Power transmission cable development for the Space Station Freedom electrical power system

    NASA Technical Reports Server (NTRS)

    Schmitz, Gregory V.; Biess, John J.

    1989-01-01

    Power transmission cable is presently being evaluated under a NASA Lewis Research Center advanced development contract for application in the Space Station Freedom (SSF) electrical power system (EPS). Evaluation testing has been performed by TRW and NASA Lewis Research Center. The results of this development contract are presented. The primary cable design goals are to provide (1) a low characteristic inductance to minimize line voltage drop at 20 kHz, (2) electromagnetic compatibility control of the 20-kHz ac power current, (3) a physical configuration that minimizes ac resistance and (4) release of trapped air for corona-free operation.

  12. High temperature superconductors as a technological discontinuity in the power cable industry

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Beales, T.P.; McCormack, J.S.

    1994-12-31

    The advent of superconductivity above 77 K represents to the power cable industry a technological discontinuity analogous to that seen in the copper telecommunications industry by the arrival of optical fibres. This phenomenon is discussed along with technical criteria and performance targets needed for high temperature superconducting wire to have an economic impact in transmission cables.

  13. High temperature superconductors as a technological discontinuity in the power cable industry

    NASA Technical Reports Server (NTRS)

    Beales, T. P.; Mccormack, J. S.

    1995-01-01

    The advent of superconductivity above 77 K represents to the power cable industry a technological discontinuity analogous to that seen in the copper telecommunications industry by the arrival of optical fibers. This phenomenon is discussed along with technical criteria and performance targets needed for high temperature superconducting wire to have an economic impact in transmission cables.

  14. 46 CFR 169.686 - Shore power.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... requirements: (a) A shore power connection box or receptacle and a cable connecting this box or receptacle to... power cable must be provided with a disconnect means located on or near the main distribution panel... 46 Shipping 7 2014-10-01 2014-10-01 false Shore power. 169.686 Section 169.686 Shipping COAST...

  15. 46 CFR 169.686 - Shore power.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... requirements: (a) A shore power connection box or receptacle and a cable connecting this box or receptacle to... power cable must be provided with a disconnect means located on or near the main distribution panel... 46 Shipping 7 2012-10-01 2012-10-01 false Shore power. 169.686 Section 169.686 Shipping COAST...

  16. 46 CFR 169.686 - Shore power.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... requirements: (a) A shore power connection box or receptacle and a cable connecting this box or receptacle to... power cable must be provided with a disconnect means located on or near the main distribution panel... 46 Shipping 7 2013-10-01 2013-10-01 false Shore power. 169.686 Section 169.686 Shipping COAST...

  17. 46 CFR 111.60-4 - Minimum cable conductor size.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Minimum cable conductor size. 111.60-4 Section 111.60-4...-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-4 Minimum cable conductor size. Each cable conductor must be #18 AWG (0.82 mm2) or larger except— (a) Each power and lighting cable conductor must be...

  18. 46 CFR 111.60-4 - Minimum cable conductor size.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Minimum cable conductor size. 111.60-4 Section 111.60-4...-GENERAL REQUIREMENTS Wiring Materials and Methods § 111.60-4 Minimum cable conductor size. Each cable conductor must be #18 AWG (0.82 mm2) or larger except— (a) Each power and lighting cable conductor must be...

  19. Evaluation of critical nuclear power plant electrical cable response to severe thermal fire conditions

    NASA Astrophysics Data System (ADS)

    Taylor, Gabriel James

    The failure of electrical cables exposed to severe thermal fire conditions are a safety concern for operating commercial nuclear power plants (NPPs). The Nuclear Regulatory Commission (NRC) has promoted the use of risk-informed and performance-based methods for fire protection which resulted in a need to develop realistic methods to quantify the risk of fire to NPP safety. Recent electrical cable testing has been conducted to provide empirical data on the failure modes and likelihood of fire-induced damage. This thesis evaluated numerous aspects of the data. Circuit characteristics affecting fire-induced electrical cable failure modes have been evaluated. In addition, thermal failure temperatures corresponding to cable functional failures have been evaluated to develop realistic single point thermal failure thresholds and probability distributions for specific cable insulation types. Finally, the data was used to evaluate the prediction capabilities of a one-dimension conductive heat transfer model used to predict cable failure.

  20. Mobile Uninterruptible Power Supply

    NASA Technical Reports Server (NTRS)

    Mears, Robert L.

    1990-01-01

    Proposed mobile unit provides 20 kVA of uninterruptible power. Used with mobile secondary power-distribution centers to provide power to test equipment with minimal cabling, hazards, and obstacles. Wheeled close to test equipment and system being tested so only short cable connections needed. Quickly moved and set up in new location. Uninterruptible power supply intended for tests which data lost or equipment damaged during even transient power failure.

  1. Safety research of insulating materials of cable for nuclear power generating station

    NASA Technical Reports Server (NTRS)

    Lee, C. K.; Choi, J. H.; Kong, Y. K.; Chang, H. S.

    1988-01-01

    The polymers PE, EPR, PVC, Neoprene, CSP, CLPE, EP and other similar substances are frequently used as insulation and protective covering for cables used in nuclear power generating stations. In order to test these materials for flame retardation, environmental resistance, and cable specifications, they were given the cable normal test, flame test, chemical tests, and subjected to design analysis and loss of coolant accident tests. Material was collected on spark tests and actual experience standards were established through these contributions and technology was accumulated.

  2. The Role of Interfaces in Polyethylene/Metal-Oxide Nanocomposites for Ultrahigh-Voltage Insulating Materials.

    PubMed

    Pourrahimi, Amir Masoud; Olsson, Richard T; Hedenqvist, Mikael S

    2018-01-01

    Recent progress in the development of polyethylene/metal-oxide nanocomposites for extruded high-voltage direct-current (HVDC) cables with ultrahigh electric insulation properties is presented. This is a promising technology with the potential of raising the upper voltage limit in today's underground/submarine cables, based on pristine polyethylene, to levels where the loss of energy during electric power transmission becomes low enough to ensure intercontinental electric power transmission. The development of HVDC insulating materials together with the impact of the interface between the particles and the polymer on the nanocomposites electric properties are shown. Important parameters from the atomic to the microlevel, such as interfacial chemistry, interfacial area, and degree of particle dispersion/aggregation, are discussed. This work is placed in perspective with important work by others, and suggested mechanisms for improved insulation using nanoparticles, such as increased charge trap density, adsorption of impurities/ions, and induced particle dipole moments are considered. The effects of the nanoparticles and of their interfacial structures on the mechanical properties and the implications of cavitation on the electric properties are also discussed. Although the main interest in improving the properties of insulating polymers has been on the use of nanoparticles, leading to nanodielectrics, it is pointed out here that larger microscopic hierarchical metal-oxide particles with high surface porosity also impart good insulation properties. The impact of the type of particle and its inherent properties (purity and conductivity) on the nanocomposite dielectric and insulating properties are also discussed based on data obtained by a newly developed technique to directly observe the charge distribution on a nanometer scale in the nanocomposite. © 2017 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  3. The creation of high-temperature superconducting cables of megawatt range in Russia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sytnikov, V. E., E-mail: vsytnikov@gmail.com; Bemert, S. E.; Krivetsky, I. V.

    Urgent problems of the power industry in the 21st century require the creation of smart energy systems, providing a high effectiveness of generation, transmission, and consumption of electric power. Simultaneously, the requirements for controllability of power systems and ecological and resource-saving characteristics at all stages of production and distribution of electric power are increased. One of the decision methods of many problems of the power industry is the development of new high-efficiency electrical equipment for smart power systems based on superconducting technologies to ensure a qualitatively new level of functioning of the electric power industry. The intensive research and developmentmore » of new types of electrical devices based on superconductors are being carried out in many industrialized advanced countries. Interest in such developments has especially increased in recent years owing to the discovery of so-called high-temperature superconductors (HTS) that do not require complicated and expensive cooling devices. Such devices can operate at cooling by inexpensive and easily accessible liquid nitrogen. Taking into account the obvious advantages of superconducting cable lines for the transmission of large power flows through an electrical network, as compared with conventional cables, the Federal Grid Company of Unified Energy System (JSC FGC UES) initiated a research and development program including the creation of superconducting HTS AC and DC cable lines. Two cable lines for the transmitted power of 50 MVA/MW at 20 kV were manufactured and tested within the framework of the program.« less

  4. The creation of high-temperature superconducting cables of megawatt range in Russia

    NASA Astrophysics Data System (ADS)

    Sytnikov, V. E.; Bemert, S. E.; Krivetsky, I. V.; Romashov, M. A.; Popov, D. A.; Fedotov, E. V.; Komandenko, O. V.

    2015-12-01

    Urgent problems of the power industry in the 21st century require the creation of smart energy systems, providing a high effectiveness of generation, transmission, and consumption of electric power. Simultaneously, the requirements for controllability of power systems and ecological and resource-saving characteristics at all stages of production and distribution of electric power are increased. One of the decision methods of many problems of the power industry is the development of new high-efficiency electrical equipment for smart power systems based on superconducting technologies to ensure a qualitatively new level of functioning of the electric power industry. The intensive research and development of new types of electrical devices based on superconductors are being carried out in many industrialized advanced countries. Interest in such developments has especially increased in recent years owing to the discovery of so-called high-temperature superconductors (HTS) that do not require complicated and expensive cooling devices. Such devices can operate at cooling by inexpensive and easily accessible liquid nitrogen. Taking into account the obvious advantages of superconducting cable lines for the transmission of large power flows through an electrical network, as compared with conventional cables, the Federal Grid Company of Unified Energy System (JSC FGC UES) initiated a research and development program including the creation of superconducting HTS AC and DC cable lines. Two cable lines for the transmitted power of 50 MVA/MW at 20 kV were manufactured and tested within the framework of the program.

  5. Feasibility study of a 270V dc flat cable aircraft electrical power distributed system

    NASA Astrophysics Data System (ADS)

    Musga, M. J.; Rinehart, R. J.

    1982-01-01

    This report documents the efforts of a one man-year feasibility study to evaluate the usage of flat conductors in place of conventional round wires for a 270 volt direct current aircraft power distribution system. This study consisted of designing electrically equivalent power distribution harnesses in flat conductor configurations for a currently operational military aircraft. Harness designs were established for installation in aircraft airframes which are: (1) All metal, or (2) All composite, or (3) a mixture of both. Flat cables have greater surface areas for heat transfer allowing higher current densities and therefore lighter weight conductors, than with round wires. Flat cables are less susceptible to electromagnetic effects. However, these positive factors are partially offset by installation and maintenance difficulties. This study concludes that the extent of these difficulties can be adequately limited with appropriate modification to present installation and maintenance practices. A comparative analysis of the flat and the round conductor power distribution harnesses was made for weight, cost, maintenance and reliability. The knowledge gained from the design and comparative analysis phases was used to generate design criteria for flat power cable harnesses and to identify and prioritize flat cable harness components and associated production tooling which require development.

  6. First World Report of Internal Power Cable Repair in Left Ventricular Assist Device Jarvik 2000: Case Report.

    PubMed

    Sassi, C G; Cameli, M; Dokollari, A; Diciolla, F; Scolletta, S; Ricci, C; Lucatelli, P; Mondillo, S; Maccherini, M

    2017-05-01

    There are limited clinical reports concerning internal power cable fixing in left ventricular assist device (L-VAD) patients. Actually there are no reports in the literature about Jarvik 2000 internal cable repair. We show the first description of a technique for surgical reparation of such a fatal complication. The patient was a 62-year-old woman who had L-VAD implantation (Jarvik 2000) with outflow graft apposition in descending thoracic aorta through left thoracotomy access, in 2009. She arrived urgently on January 25, 2014 for Jarvik 2000 dysfunction correlated with head movements. The neck X-rays revealed the rupture of one of the nine power cables located inside the neck and the damaging of two more cables nearby to be ruptured. On the same day she got pump failure due to the final interruption of the remaining two cables, we were obliged to install femoro-femoral extracorporeal membrane oxygenation (ECMO) assistance, to repair the power cables, approaching them through a pacemaker extension cable. The L-VAD outflow was occluded with vascular ball occluder inserted via right axillary artery under fluoroscopy before ECMO installation. At the end the ECMO assistance was interrupted and the Jarvik 2000 was turned back on. The patient was dismissed from the hospital 12 days after the procedure. At the moment the international literature is poor regarding this issue. This case provides evidence that in emergency conditions ECMO assistance is mandatory and a hybrid surgical and radiological approach could help to repair the damage in safe conditions. Copyright © 2017 Elsevier Inc. All rights reserved.

  7. Study on AC loss measurements of HTS power cable for standardizing

    NASA Astrophysics Data System (ADS)

    Mukoyama, Shinichi; Amemiya, Naoyuki; Watanabe, Kazuo; Iijima, Yasuhiro; Mido, Nobuhiro; Masuda, Takao; Morimura, Toshiya; Oya, Masayoshi; Nakano, Tetsutaro; Yamamoto, Kiyoshi

    2017-09-01

    High-temperature superconducting power cables (HTS cables) have been developed for more than 20 years. In addition of the cable developments, the test methods of the HTS cables have been discussed and proposed in many laboratories and companies. Recently the test methods of the HTS cables is required to standardize and to common in the world. CIGRE made the working group (B1-31) for the discussion of the test methods of the HTS cables as a power cable, and published the recommendation of the test method. Additionally, IEC TC20 submitted the New Work Item Proposal (NP) based on the recommendation of CIGRE this year, IEC TC20 and IEC TC90 started the standardization work on Testing of HTS AC cables. However, the individual test method that used to measure a performance of HTS cables hasn’t been established as world’s common methods. The AC loss is one of the most important properties to disseminate low loss and economical efficient HTS cables in the world. We regard to establish the method of the AC loss measurements in rational and in high accuracy. Japan is at a leading position in the AC loss study, because Japanese researchers have studied on the AC loss technically and scientifically, and also developed the effective technologies for the AC loss reduction. The JP domestic commission of TC90 made a working team to discussion the methods of the AC loss measurements for aiming an international standard finally. This paper reports about the AC loss measurement of two type of the HTS conductors, such as a HTS conductor without a HTS shield and a HTS conductor with a HTS shield. The AC loss measurement method is suggested by the electrical method..

  8. 46 CFR 129.340 - Cable and wiring.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... buildup of condensation. (b) Each cable and wire must— (1) Have stranded copper conductors with sufficient... Power Sources and Distribution Systems § 129.340 Cable and wiring. (a) If individual wires, rather than cables, are used in systems operating at a potential of greater than 50 volts, the wire and associated...

  9. 46 CFR 129.340 - Cable and wiring.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... buildup of condensation. (b) Each cable and wire must— (1) Have stranded copper conductors with sufficient... Power Sources and Distribution Systems § 129.340 Cable and wiring. (a) If individual wires, rather than cables, are used in systems operating at a potential of greater than 50 volts, the wire and associated...

  10. 46 CFR 129.340 - Cable and wiring.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... buildup of condensation. (b) Each cable and wire must— (1) Have stranded copper conductors with sufficient... Power Sources and Distribution Systems § 129.340 Cable and wiring. (a) If individual wires, rather than cables, are used in systems operating at a potential of greater than 50 volts, the wire and associated...

  11. 46 CFR 129.340 - Cable and wiring.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... buildup of condensation. (b) Each cable and wire must— (1) Have stranded copper conductors with sufficient... Power Sources and Distribution Systems § 129.340 Cable and wiring. (a) If individual wires, rather than cables, are used in systems operating at a potential of greater than 50 volts, the wire and associated...

  12. Medical devices utilizing optical fibers for simultaneous power, communications and control

    DOEpatents

    Fitch, Joseph P.; Matthews, Dennis L.; Hagans, Karla G.; Lee, Abraham P.; Krulevitch, Peter; Benett, William J.; Clough, Robert E.; DaSilva, Luiz B.; Celliers, Peter M.

    2003-06-10

    A medical device is constructed in the basic form of a catheter having a distal end for insertion into and manipulation within a body and a proximal end providing for a user to control the manipulation of the distal end within the body. A fiberoptic cable is disposed within the catheter and having a distal end proximate to the distal end of the catheter and a proximal end for external coupling of laser light energy. A laser-light-to-mechanical-power converter is connected to receive light from the distal end of the fiber optic cable and may include a photo-voltaic cell and an electromechanical motor or a heat-sensitive photo-thermal material. An electronic sensor is connected to receive electrical power from said distal end of the fiberoptic cable and is connected to provide signal information about a particular physical environment and communicated externally through the fiberoptic cable to the proximal end thereof. A mechanical sensor is attached to the distal end of the fiberoptic cable and connected to provide light signal information about a particular physical environment and communicated externally through the fiberoptic cable.

  13. Cabling design of booster and storage ring construction progress of TPS

    NASA Astrophysics Data System (ADS)

    Wong, Y.-S.; Liu, K.-B.; Liu, C.-Y.; Wang, b.-S.

    2017-06-01

    The 2012 Taiwan Photon Source (TPS) cable construction project started after 10 months to complete the cable laying and installation of power supply. The circumference of the booster ring (BR) is 496.8 m, whereas that of the storage ring (SR) is 518.4 m. Beam current is set to 500 mA at 3.3 GeV. The paper on grounding systems discusses the design of the ground wire (< 0.2 Ω) with low impedance, power supply of the accelerator and cabling tray. The flow and size of the ground current are carefully evaluated to avoid grounded current from flowing everywhere, which causes interference problems. In the design of the TPS, special shielding will be established to isolate the effects of electromagnetic interference on the magnet and ground current. Booster ring dipoles are connected by a series of 54-magnet bending dipole; the cable size of its stranded wire measures 250 mm2, with a total length of 5000 m. Booster ring and storage ring quadrupoles have 150 magnets; the cable size of their stranded wire is 250 mm2, with a total length of 17000 m. Storage ring dipole consists of 48 magnets; the cable size of its stranded wire is 325 mm2, with a total length of 6000 m. This study discusses the power supply cabling design of the storage ring and booster ring construction progress of TPS. The sections of this paper are divided into discussions of the construction of the control and instrument area, cabling layout of booster ring and storage ring, as well as the installation and commission machine. This study also discusses the use of a high-impedance meter to determine the effect of cabling insulation and TPS power supply machine on energy transfer to ensure the use of safe and correct magnet.

  14. High-Voltage, Low-Power BNC Feedthrough Terminator

    NASA Technical Reports Server (NTRS)

    Bearden, Douglas

    2012-01-01

    This innovation is a high-voltage, lowpower BNC (Bayonet Neill-Concelman) feedthrough that enables the user to terminate an instrumentation cable properly while connected to a high voltage, without the use of a voltage divider. This feedthrough is low power, which will not load the source, and will properly terminate the instrumentation cable to the instrumentation, even if the cable impedance is not constant. The Space Shuttle Program had a requirement to measure voltage transients on the orbiter bus through the Ground Lightning Measurement System (GLMS). This measurement has a bandwidth requirement of 1 MHz. The GLMS voltage measurement is connected to the orbiter through a DC panel. The DC panel is connected to the bus through a nonuniform cable that is approximately 75 ft (approximately equal to 23 m) long. A 15-ft (approximately equal to 5-m), 50-ohm triaxial cable is connected between the DC panel and the digitizer. Based on calculations and simulations, cable resonances and reflections due to mismatched impedances of the cable connecting the orbiter bus and the digitizer causes the output not to reflect accurately what is on the bus. A voltage divider at the DC panel, and terminating the 50-ohm cable properly, would eliminate this issue. Due to implementation issues, an alternative design was needed to terminate the cable properly without the use of a voltage divider. Analysis shows how the cable resonances and reflections due to the mismatched impedances of the cable connecting the orbiter bus and the digitizer causes the output not to reflect accurately what is on the bus. After simulating a dampening circuit located at the digitizer, simulations were performed to show how the cable resonances were dampened and the accuracy was improved significantly. Test cables built to verify simulations were accurate. Since the dampening circuit is low power, it can be packaged in a BNC feedthrough.

  15. Research of Characteristics of the Low Voltage Power Line in Underground Coal Mine

    NASA Astrophysics Data System (ADS)

    Wei, Shaoliang; Qin, Shiqun; Gao, Wenchang; Cheng, Fengyu; Cao, Zhongyue

    The power line communications (PLCs) can count on existing electrical connections reaching each corner in the locations where such applications are required, so signal transmission over power lines is nowadays gaining more and more interest for applications like internet. The research of characteristics of the low voltage power line is the fundamental and importance task. This work presents a device to test the characteristics of the low voltage power line. The low voltage power line channel characteristics overground and the channel characteristics underground were tested in using this device. Experiments show that, the characteristics are different between the PLCs channel underground coal mine and the PLC channel overground. Different technology should be adopted to structure the PLCs channel model underground coal mine and transmit high speed digital signal. But how to use the technology better to the high-speed digital communication under coal mine is worth of further studying.

  16. [Computation of the cross-sectional area of the cable in the power circuit of the X-ray machine].

    PubMed

    Meng, Xin-min; Feng, Da-yu

    2007-01-01

    The source impedance of the power circuit in the x-ray machine is analyzed in the paper and based on the voltage drop generated by the impedance, the cross-sectional area of the cable is calculated. In the end, the cross-sectional areas of the cables, corresponding to their respective distances between the transformers and the switchboards are given.

  17. 77 FR 25729 - Notice of Issuance of Final Determination Concerning Certain Agilent Oscilloscopes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-01

    .... LIT. 7. AC line filter PCA that acts as the power manager; 8. Power supply; 9. Fan; 10. Bucket..., consisting of the fan, the AC Line Filter PCA, power supply, AC and DC cables, and wiring, is installed into... power cable on the front deck subassembly is connected to the AC line filter PCA on the rear deck...

  18. Repairing Damaged Power-Cable Insulation

    NASA Technical Reports Server (NTRS)

    Baker, G. E.

    1984-01-01

    Simple method saves time, money, and material. In new method cable remains in place while new insulation is applied to damaged portion. Method results in new terminations with safety factor equal to that of any portion of cable.

  19. Time-delayed directional beam phased array antenna

    DOEpatents

    Fund, Douglas Eugene; Cable, John William; Cecil, Tony Myron

    2004-10-19

    An antenna comprising a phased array of quadrifilar helix or other multifilar antenna elements and a time-delaying feed network adapted to feed the elements. The feed network can employ a plurality of coaxial cables that physically bridge a microstrip feed circuitry to feed power signals to the elements. The cables provide an incremental time delay which is related to their physical lengths, such that replacing cables having a first set of lengths with cables having a second set of lengths functions to change the time delay and shift or steer the antenna's main beam. Alternatively, the coaxial cables may be replaced with a programmable signal processor unit adapted to introduce the time delay using signal processing techniques applied to the power signals.

  20. Superconducting ac cable

    NASA Astrophysics Data System (ADS)

    Schmidt, F.

    1980-11-01

    The components of a superconducting 110 kV ac cable for power ratings or = 2000 MVA were developed. The cable design is of the semiflexible type, with a rigid cryogenic envelope containing a flexible hollow coaxial cable core. The cable core consists of spirally wound Nb-A1 composite wires electrically insulated by high pressure polyethylene tape wrappings. A 35 m long single phase test cable with full load terminals rated at 110 kV and 10 kA was constructed and successfully tested. The results obtained prove the technical feasibility and capability of this cable design.

  1. Portable Power And Digital-Communication Units

    NASA Technical Reports Server (NTRS)

    Levin, Richard R.; Henry, Paul K.; Rosenberg, Leigh S.

    1992-01-01

    Conceptual network of electronic-equipment modules provides electrical power and digital radio communications at multiple sites not served by cables. System includes central communication unit and portable units powered by solar photovoltaic arrays. Useful to serve equipment that must be set up quickly at remote sites or buildings that cannot be modified to provide cable connections.

  2. 33 CFR 80.707 - Cape Romain, SC to Sullivans Island, SC.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the easternmost extremity of Capers Island. (d) A line formed by the overhead power cable from Capers Island to Dewees Island. (e) A line formed by the overhead power cable from Dewees Island to Isle of...

  3. 47. BASE OF UMBILICAL MAST, WITH ELECTRICAL POWER CABLES ON ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    47. BASE OF UMBILICAL MAST, WITH ELECTRICAL POWER CABLES ON LEFT; AIR-CONDITIONER DUCTS ON RIGHT - Vandenberg Air Force Base, Space Launch Complex 3, Launch Pad 3 East, Napa & Alden Roads, Lompoc, Santa Barbara County, CA

  4. 33 CFR 80.707 - Cape Romain, SC to Sullivans Island, SC.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the easternmost extremity of Capers Island. (d) A line formed by the overhead power cable from Capers Island to Dewees Island. (e) A line formed by the overhead power cable from Dewees Island to Isle of...

  5. 30 CFR 57.22311 - Electrical cables (II-A mines).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards for Methane in Metal and Nonmetal Mines Equipment § 57.22311 Electrical cables (II-A mines). Only jacketed electrical cables accepted or approved by MSHA as flame resistant shall be used to supply power to... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Electrical cables (II-A mines). 57.22311...

  6. 30 CFR 57.22311 - Electrical cables (II-A mines).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Standards for Methane in Metal and Nonmetal Mines Equipment § 57.22311 Electrical cables (II-A mines). Only jacketed electrical cables accepted or approved by MSHA as flame resistant shall be used to supply power to... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Electrical cables (II-A mines). 57.22311...

  7. 30 CFR 57.22311 - Electrical cables (II-A mines).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards for Methane in Metal and Nonmetal Mines Equipment § 57.22311 Electrical cables (II-A mines). Only jacketed electrical cables accepted or approved by MSHA as flame resistant shall be used to supply power to... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Electrical cables (II-A mines). 57.22311...

  8. 30 CFR 57.22311 - Electrical cables (II-A mines).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standards for Methane in Metal and Nonmetal Mines Equipment § 57.22311 Electrical cables (II-A mines). Only jacketed electrical cables accepted or approved by MSHA as flame resistant shall be used to supply power to... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Electrical cables (II-A mines). 57.22311...

  9. 30 CFR 57.22311 - Electrical cables (II-A mines).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standards for Methane in Metal and Nonmetal Mines Equipment § 57.22311 Electrical cables (II-A mines). Only jacketed electrical cables accepted or approved by MSHA as flame resistant shall be used to supply power to... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Electrical cables (II-A mines). 57.22311...

  10. High-performance, lightweight coaxial cable from carbon nanotube conductors.

    PubMed

    Jarosz, Paul R; Shaukat, Aalyia; Schauerman, Christopher M; Cress, Cory D; Kladitis, Paul E; Ridgley, Richard D; Landi, Brian J

    2012-02-01

    Coaxial cables have been constructed with carbon nanotube (CNT) materials serving as both the inner and outer conductors. Treatment of the CNT outer and inner conductors with KAuBr(4) was found to significantly reduce the attenuation of these cables, which demonstrates that chemical agents can be used to improve power transmission through CNT networks at high frequencies (150 kHz-3 GHz). For cables constructed with a KAuBr(4)-treated CNT outer conductor, power attenuation per length approaches parity with cables constructed from metallic conductors at significantly lower weight per length (i.e., 7.1 g/m for CNT designs compared to 38.8 g/m for an RG-58 design). A relationship between the thickness of the CNT outer conductor and the cable attenuation was observed and used to estimate the effective skin depth at high frequency. These results establish reliable, reproducible methods for the construction of coaxial cables from CNT materials that can facilitate further investigation of their performance in high-frequency transmission structures, and highlight a specific opportunity for significant reduction in coaxial cable mass.

  11. Assessment of the insulation degradation of cables used in nuclear power plants

    NASA Astrophysics Data System (ADS)

    Bartoníc̆ek, B.; Hnát, V.; Plac̆ek, V.

    1999-05-01

    Cable insulating materials are usually, during their operational lifetime, exposed to a high number of various deteriorative enviromental effects resulting in their degradation. In the case of cables used in the nuclear power plant (NPP) hermetic zone these factors consist predominantly of long-term irradiation (at rather low dose rates, in the presence of oxygen) and enhanced temperature. Hence, all cables assigned for use in NPP have to be qualified for use under such severe conditions. However, not only the initial qualification but also monitoring of the actual state of the installed cables in regular intervals is now recommended. Monitoring of the actual state of the cable insulation and the prediction of their residual service life (i.e., the on-going qualification) consist of the measurement of the properties that are directly proportional to the functionality of the cables (usually the elongation at break is used as the critical parameter). For the cables installed in the NPP hermetic zone a method based on the measurement of the thermo-oxidative stability by the differential scanning calorimetry has been developed.

  12. Detection of incipient defects in cables by partial discharge signal analysis

    NASA Astrophysics Data System (ADS)

    Martzloff, F. D.; Simmon, E.; Steiner, J. P.; Vanbrunt, R. J.

    1992-07-01

    As one of the objectives of a program aimed at assessing test methods for in-situ detection of incipient defects in cables due to aging, a laboratory test system was implemented to demonstrate that the partial discharge analysis method can be successfully applied to low-voltage cables. Previous investigations generally involved cables rated 5 kV or higher, while the objective of the program focused on the lower voltages associated with the safety systems of nuclear power plants. The defect detection system implemented for the project was based on commercially available signal analysis hardware and software packages, customized for the specific purposes of the project. The test specimens included several cables of the type found in nuclear power plants, including artificial defects introduced at various points of the cable. The results indicate that indeed, partial discharge analysis is capable of detecting incipient defects in low-voltage cables. There are, however, some limitations of technical and non-technical nature that need further exploration before this method can be accepted in the industry.

  13. Reusable Hot-Wire Cable Cutter

    NASA Technical Reports Server (NTRS)

    Pauken, Michael T.; Steinkraus, Joel M.

    2010-01-01

    During the early development stage of balloon deployment systems for missions, nichrome wire cable cutters were often used in place of pyro-actuated cutters. Typically, a nichrome wire is wrapped around a bundle of polymer cables with a low melting point and connected to a relay-actuated electric circuit. The heat from the nichrome reduces the strength of the cable bundle, which quickly breaks under a mechanical load and can thus be used as a release mechanism for a deployment system. However, the use of hand-made heated nichrome wire for cutters is not very reliable. Often, the wrapped nichrome wire does not cut through the cable because it either pulls away from its power source or does not stay in contact with the cable being cut. Because nichrome is not readily soldered to copper wire, unreliable mechanical crimps are often made to connect the nichrome to an electric circuit. A self-contained device that is reusable and reliable was developed to sever cables for device release or deployment. The nichrome wire in this new device is housed within an enclosure to prevent it from being damaged by handling. The electric power leads are internally connected within the unit to the nichrome wire using a screw terminal connection. A bayonet plug, a quick and secure method of connecting the cutter to the power source, is used to connect the cutter to the power leads similar to those used in pyro-cutter devices. A small ceramic tube [0.25-in. wide 0.5-in. long (.6.4-mm wide 13-mm long)] houses a spiraled nichrome wire that is heated when a cable release action is required. The wire is formed into a spiral coil by wrapping it around a mandrel. It is then laid inside the ceramic tube so that it fits closely to the inner surface of the tube. The ceramic tube provides some thermal and electrical insulation so that most of the heat generated by the wire is directed toward the cable bundle in the center of the spiral. The ceramic tube is cemented into an aluminum block, which holds it in position. The leads of the nichrome wire are attached to screw terminals that connect them to power leads. A bayonet plug mounted at the bottom of the rectangular block connects the power leads to a relay circuit. A thin aluminum shell encloses the entire structure, leaving access points to attach to the bayonet plug and to feed a cable into the cylinder. The access holes for the deployment cable are a smaller diameter than the nichrome coil to prevent the cable from coming in direct contact with the nichrome when loaded. It uses the same general method of severing a cable with a heated wire as was used previously, but implements it in such a way that it is more reliable and less prone to failure. It creates a mechanism to create repeatability that was nonexistent in the previous method.

  14. Stochastic Modelling of Wireless Energy Transfer

    NASA Technical Reports Server (NTRS)

    Veilleux, Shaun; Almaghasilah, Ahmed; Abedi, Ali; Wilkerson, DeLisa

    2017-01-01

    This study investigates the efficiency of a new method of powering remote sensors by the means of wireless energy transfer. The increased use of sensors for data collection comes with the inherent cost of supplying power from sources such as power cables or batteries. Wireless energy transfer technology eliminates the need for power cables or periodic battery replacement. The time and cost of setting up or expanding a sensor network will be reduced while allowing sensors to be placed in areas where running power cables or battery replacement is not feasible. This paper models wireless channels for power and data separately. Smart scheduling for the data channel is proposed to avoid transmitting data on a noisy channel where the probability of data loss is high to improve power efficiency. Analytical models have been developed and verified using simulations.

  15. Power systems for ocean regional cabled observatories

    NASA Technical Reports Server (NTRS)

    Kojima, Junichi; Asakawa, Kenichi; Howe, Bruce M.; Kirkham, Harold

    2004-01-01

    Development of power systems is the most challenging technical issue in the design of ocean regional cabled observatories. ARENA and NEPTUNE are two ocean regional cabled observatory networks with aims that are at least broadly similar. Yet the two designs are quite different in detail. This paper outlines the both systems and explores the reasons for the divergence of design, and shows that it arose because of differences in the priority of requirements.

  16. A Novel Concept for the Rapid Deployment of Electric Power Cables. Phase 1.

    DTIC Science & Technology

    1987-04-30

    cable toward the tactical position that requires power. The approach effectively neutralisasl both man-made and naturally occurring deployment...guided system with a reputation for extreme accuracy, it is anticipated that the cable can be delivered to a user located within a 1000 foot range...thus readily available, because it is an effective and reliable weapon system. The system has been up-graded several times which indicates that its

  17. DC Cable for Railway

    NASA Astrophysics Data System (ADS)

    Tomita, Masaru

    The development of a superconducting cable for railways has commenced, assuming that a DC transmission cable will be used for electric trains. The cable has been fabricated based on the results of current testing of a superconducting wire, and various evaluation tests have been performed to determine the characteristics of the cable. A superconducting transmission cable having zero electrical resistance and suitable for railway use is expected to enhance regeneration efficiency, reduce power losses, achieve load leveling and integration of sub-stations, and reduce rail potential.

  18. NEMA wire and cable standards development programs

    NASA Astrophysics Data System (ADS)

    Baird, Robert W.

    1994-01-01

    The National Electrical Manufacturers Association (NEMA) is the nation's largest trade association for manufacturers of electrical equipment. Its member companies produce components, end-use equipment and systems for the generation, transmission, distribution, control and use of electricity. The wire and cable division is presented in 6 sections: building wire and cable, fabricated conductors, flexible cords, high performance wire and cable, magnet wire, and power and control cable. Participating companies are listed.

  19. Response of Nuclear Power Plant Instrumentation Cables Exposed to Fire Conditions.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muna, Alice Baca; LaFleur, Chris Bensdotter; Brooks, Dusty Marie

    This report presents the results of instrumentation cable tests sponsored by the US Nuclear Regulatory Commission (NRC) Office of Nuclear Regulatory Research and performed at Sandia National Laboratories (SNL). The goal of the tests was to assess thermal and electrical response behavior under fire-exposure conditions for instrumentation cables and circuits. The test objective was to assess how severe radiant heating conditions surrounding an instrumentation cable affect current or voltage signals in an instrumentation circuit. A total of thirty-nine small-scale tests were conducted. Ten different instrumentation cables were tested, ranging from one conductor to eight-twisted pairs. Because the focus of themore » tests was thermoset (TS) cables, only two of the ten cables had thermoplastic (TP) insulation and jacket material and the remaining eight cables were one of three different TS insulation and jacket material. Two instrumentation cables from previous cable fire testing were included, one TS and one TP. Three test circuits were used to simulate instrumentation circuits present in nuclear power plants: a 4–20 mA current loop, a 10–50 mA current loop and a 1–5 VDC voltage loop. A regression analysis was conducted to determine key variables affecting signal leakage time.« less

  20. Light Water Reactor Sustainability (LWRS) Program – Non-Destructive Evaluation (NDE) R&D Roadmap for Determining Remaining Useful Life of Aging Cables in Nuclear Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simmons, Kevin L.; Ramuhalli, Pradeep; Brenchley, David L.

    2012-09-14

    The purpose of the non-destructive evaluation (NDE) R&D Roadmap for Cables is to support the Materials Aging and Degradation (MAaD) R&D pathway. The focus of the workshop was to identify the technical gaps in detecting aging cables and predicting their remaining life expectancy. The workshop was held in Knoxville, Tennessee, on July 30, 2012, at Analysis and Measurement Services Corporation (AMS) headquarters. The workshop was attended by 30 experts in materials, electrical engineering, U.S. Nuclear Regulatory Commission (NRC), U.S. Department of Energy (DOE) National Laboratories (Oak Ridge National Laboratory, Pacific Northwest National Laboratory, Argonne National Laboratory, and Idaho National Engineeringmore » Laboratory), NDE instrumentation development, universities, commercial NDE services and cable manufacturers, and Electric Power Research Institute (EPRI). The motivation for the R&D roadmap comes from the need to address the aging management of in-containment cables at nuclear power plants (NPPs).« less

  1. Injury Surveillance and Safety Considerations for Large-Format Lead-Acid Batteries Used in Mining Applications.

    PubMed

    Reyes, Miguel Angel; Novak, Thomas

    2016-03-01

    Large lead-acid batteries are predominantly used throughout the mining industry to power haulage, utility, and personnel-carrier vehicles. Without proper operation and maintenance, the use of these batteries can introduce mechanical and electrical hazards, particularly in the confined, and potentially dangerous, environment of an underground coal mine. A review of the Mine Safety and Health Administration accident/illness/injury database reveals that a significant number of injuries occur during the maintenance and repair of lead-acid batteries. These injuries include burns from electrical arcing and acid exposure, as well as strained muscles and crushed hands. The National Institute for Occupational Safety and Health investigated the design and implementation of these batteries to identify safety interventions that can mitigate these inherent hazards. This paper promotes practical design modifications, such as reducing the size and weight of battery assembly lids in conjunction with lift assists, as well as using five-pole cable connectors to improve safety.

  2. Injury Surveillance and Safety Considerations for Large-Format Lead-Acid Batteries Used in Mining Applications

    PubMed Central

    Reyes, Miguel Angel; Novak, Thomas

    2016-01-01

    Large lead-acid batteries are predominantly used throughout the mining industry to power haulage, utility, and personnel-carrier vehicles. Without proper operation and maintenance, the use of these batteries can introduce mechanical and electrical hazards, particularly in the confined, and potentially dangerous, environment of an underground coal mine. A review of the Mine Safety and Health Administration accident/illness/injury database reveals that a significant number of injuries occur during the maintenance and repair of lead-acid batteries. These injuries include burns from electrical arcing and acid exposure, as well as strained muscles and crushed hands. The National Institute for Occupational Safety and Health investigated the design and implementation of these batteries to identify safety interventions that can mitigate these inherent hazards. This paper promotes practical design modifications, such as reducing the size and weight of battery assembly lids in conjunction with lift assists, as well as using five-pole cable connectors to improve safety. PMID:27784953

  3. AC HTS Transmission Cable for Integration into the Future EHV Grid of the Netherlands

    NASA Astrophysics Data System (ADS)

    Zuijderduin, R.; Chevtchenko, O.; Smit, J. J.; Aanhaanen, G.; Melnik, I.; Geschiere, A.

    Due to increasing power demand, the electricity grid of the Netherlands is changing. The future grid must be capable to transmit all the connected power. Power generation will be more decentralized like for instance wind parks connected to the grid. Furthermore, future large scale production units are expected to be installed near coastal regions. This creates some potential grid issues, such as: large power amounts to be transmitted to consumers from west to east and grid stability. High temperature superconductors (HTS) can help solving these grid problems. Advantages to integrate HTS components at Extra High Voltage (EHV) and High Voltage (HV) levels are numerous: more power with less losses and less emissions, intrinsic fault current limiting capability, better control of power flow, reduced footprint, etc. Today's main obstacle is the relatively high price of HTS. Nevertheless, as the price goes down, initial market penetration for several HTS components is expected by year 2015 (e.g.: cables, fault current limiters). In this paper we present a design of intrinsically compensated EHV HTS cable for future grid integration. Discussed are the parameters of such cable providing an optimal power transmission in the future network.

  4. OTEC riser cable model and prototype testing

    NASA Astrophysics Data System (ADS)

    Kurt, J. P.; Schultz, J. A.; Roblee, L. H. S.

    1981-12-01

    Two different OTEC riser cables have been developed to span the distance between a floating OTEC power plant and the ocean floor. The major design concerns for a riser cable in the dynamic OTEC environment are fatigue, corrosion, and electrical/mechanical aging of the cable components. The basic properties of the cable materials were studied through tests on model cables and on samples of cable materials. Full-scale prototype cables were manufactured and were tested to measure their electrical and mechanical properties and performance. The full-scale testing was culminated by the electrical/mechanical fatigue test, which exposes full-scale cables to simultaneous tension, bending and electrical loads, all in a natural seawater environment.

  5. Designing and Implementation a Lab Testing Method for Power Cables Insulation Resistance According with STAS 10411-89, SR EN ISO/CEI/17025/2005

    NASA Astrophysics Data System (ADS)

    Dobra, R.; Pasculescu, D.; Marc, G.; Risteiu, M.; Antonov, A.

    2017-06-01

    Insulation resistance measurement is one of the most important tests required by standards and regulations in terms of electrical safety. Why these tests are is to prevent possible accidents caused by electric shock, damage to equipment or outbreak of fire in normal operating conditions of electrical cables. The insulation resistance experiment refers to the testing of electrical cable insulation, which has a measured resistance that must be below the imposed regulations. Using a microcontroller system data regarding the insulation resistance of the power cables is acquired and with SCADA software the test results are displayed.

  6. Controlling Low-Rate Signal Path Microdischarge for an Ultra-Low-Background Proportional Counter

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mace, Emily K.; Aalseth, Craig E.; Bonicalzi, Ricco

    2013-05-01

    ABSTRACT Pacific Northwest National Laboratory (PNNL) has developed an ultra-low-background proportional counter (ULBPC) made of high purity copper. These detectors are part of an ultra-low-background counting system (ULBCS) in the newly constructed shallow underground laboratory at PNNL (at a depth of ~30 meters water-equivalent). To control backgrounds, the current preamplifier electronics are located outside the ULBCS shielding. Thus the signal from the detector travels through ~1 meter of cable and is potentially susceptible to high voltage microdischarge and other sources of electronic noise. Based on initial successful tests, commercial cables and connectors were used for this critical signal path. Subsequentmore » testing across different batches of commercial cables and connectors, however, showed unwanted (but still low) rates of microdischarge noise. To control this noise source, two approaches were pursued: first, to carefully validate cables, connectors, and other commercial components in this critical signal path, making modifications where necessary; second, to develop a custom low-noise, low-background preamplifier that can be integrated with the ULBPC and thus remove most commercial components from the critical signal path. This integrated preamplifier approach is based on the Amptek A250 low-noise charge-integrating preamplifier module. The initial microdischarge signals observed are presented and characterized according to the suspected source. Each of the approaches for mitigation is described, and the results from both are compared with each other and with the original performance seen with commercial cables and connectors.« less

  7. High-temperature flat-conductor cable

    NASA Technical Reports Server (NTRS)

    Rigling, W. S.

    1976-01-01

    Temperature limit of 25-conductor signal cable and 3-conductor power cable, fabricated using woven and roll laminated technique, increased from 200 C to 350 C when polyimide/fluorinated ethylene propylene or polytetrafluoroethylene insulation films and fluorinated ethylene propylene as adhesive medium is applied.

  8. Electromagnetic-Pulse Handbook for Electric Power Systems

    DTIC Science & Technology

    1975-02-04

    penetratlor.s such as communications cables, antenna leads, etc.). (6) Avoid connecting the power neutral and external cable shields to the same point on the...prepared primarily for the power, communications , and systems engineer who must be concerned with the offects of the nuclear electromagnetic pulse on...INTRODUCTION Until a few years ago, the nuclear EMP community gave little attention to commer- cial power systems other than to recommend surge arrestors

  9. Instrumentation Cables Test Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Muna, Alice Baca; LaFleur, Chris Bensdotter

    A fire at a nuclear power plant (NPP) has the potential to damage structures, systems, and components important to safety, if not promptly detected and suppressed. At Browns Ferry Nuclear Power Plant on March 22, 1975, a fire in the reactor building damaged electrical power and control systems. Damage to instrumentation cables impeded the function of both normal and standby reactor coolant systems, and degraded the operators’ plant monitoring capability. This event resulted in additional NRC involvement with utilities to ensure that NPPs are properly protected from fire as intended by the NRC principle design criteria (i.e., general design criteriamore » 3, Fire Protection). Current guidance and methods for both deterministic and performance based approaches typically make conservative (bounding) assumptions regarding the fire-induced failure modes of instrumentation cables and those failure modes effects on component and system response. Numerous fire testing programs have been conducted in the past to evaluate the failure modes and effects of electrical cables exposed to severe thermal conditions. However, that testing has primarily focused on control circuits with only a limited number of tests performed on instrumentation circuits. In 2001, the Nuclear Energy Institute (NEI) and the Electric Power Research Institute (EPRI) conducted a series of cable fire tests designed to address specific aspects of the cable failure and circuit fault issues of concern1. The NRC was invited to observe and participate in that program. The NRC sponsored Sandia National Laboratories to support this participation, whom among other things, added a 4-20 mA instrumentation circuit and instrumentation cabling to six of the tests. Although limited, one insight drawn from those instrumentation circuits tests was that the failure characteristics appeared to depend on the cable insulation material. The results showed that for thermoset insulated cables, the instrument reading tended to drift and fluctuate, while the thermoplastic insulated cables, the instrument reading fell off-scale rapidly. From an operational point of view, the latter failure characteristics would likely be identified as a failure from the effects of fire, while the former may result in inaccurate readings.« less

  10. Total radiated power, infrared output, and heat generation by cold light sources at the distal end of endoscopes and fiber optic bundle of light cables.

    PubMed

    Hensman, C; Hanna, G B; Drew, T; Moseley, H; Cuschieri, A

    1998-04-01

    Skin burns and ignition of drapes have been reported with the use of cold light sources. The aim of the study was to document the temperature generated by cold light sources and to correlate this with the total radiated power and infrared output. The temperature, total radiated power, and infrared output were measured as a function of time at the end of the endoscope (which is inserted into the operative field) and the end of the fiber optic bundle of the light cable (which connects the cable to the light port of the endoscope) using halogen and xenon light sources. The highest temperature recorded at the end of the endoscope was 95 degrees C. The temperature measured at the optical fiber location of the endoscope was higher than at its lens surface (p < 0.0001). At the end of the fiber optic bundle of light cables, the temperature reached 225 degrees C within 15 s. The temperature recorded at the optical fiber location of all endoscopes and light cables studied rose significantly over a period of 10 min to reach its maximum (p <0.0001) and then leveled off for the duration of the study (30 min). The infrared output accounted only for 10% of the total radiated power. High temperatures are reached by 10 min at the end of fiber optic bundle of light cables and endoscopes with both halogen and xenon light sources. This heat generation is largely due to the radiated power in the visible light spectrum.

  11. Effects of submarine power transmission cables on a glass sponge reef and associated megafaunal community.

    PubMed

    Dunham, A; Pegg, J R; Carolsfeld, W; Davies, S; Murfitt, I; Boutillier, J

    2015-06-01

    We examined the effects of submarine power transmission cable installation and operation on glass sponge reef condition and associated megafauna. Video and still imagery were collected using a Remotely Operated Vehicle twice a year for 4 years following cable installation. The effects of cables on glass sponges were assessed by comparing sponge cover along fixed transects and at marked index sites. Megafauna counts along transects were used to explore the effects on associated community. We found no evidence of cable movement across the sponge reef surface. Live sponge cover was found to be consistently lower along cable transects and at cable index sites compared to controls. Live sponge cover was the lowest (55 ± 1.1% decrease) at cable index sites 1.5 years after installation and recovered to 85 ± 30.6% of the original size over the following 2 years. Our data suggest 100% glass sponge mortality along the direct cable footprint and 15% mortality in the surrounding 1.5 m corridor 3.5 years after cable installation. Growth rate of a new glass sponge was 1 and 3 cm/year in first and second year, respectively, and appeared to be seasonal. We observed a diverse megafaunal community with representatives from 7 phyla and 14 classes. Total megafauna, spot prawn, and other Arthropoda abundances were slightly lower along cable transects although the effect of cable presence was not statistically significant. The following measures could be taken to reduce the amount of damage to glass sponge reefs and associated fauna: routing the cable around reefs, whenever possible, minimizing cable movement across the surface of the reef at installation and routine operation, and assessing potential damage to glass sponges prior to decommissioning. Crown Copyright © 2015. Published by Elsevier Ltd. All rights reserved.

  12. Transient sheath overvoltages in armored power cables

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gustavsen, B.; Sletbak, J.

    1996-07-01

    This paper is concerned with methods of limiting the build-up of transient voltages between sheath and armor in long armored power cables. Calculations by a frequency dependent cable model demonstrate that this voltage can be efficiently limited to an acceptable level by introducing sheath-armor bondings at regular intervals, or by using a semiconductive sheath-armor interlayer. The paper investigates the required minimum length between bondings, as well as the required conductivity of the sheath-armor interlayer if the use of bondings is to be avoided.

  13. Horizontal cryogenic bushing for the termination of a superconducting power-transmission line

    DOEpatents

    Minati, K.F.; Morgan, G.H.; McNerney, A.J.; Schauer, F.

    1982-07-29

    A termination for a superconducting power transmission line is disclosed which is comprised of a standard air entrance insulated vertical bushing with an elbow, a horizontal cryogenic bushing linking the pressurized cryogenic cable environment to the ambient temperature bushing and a stress cone which terminated the cable outer shield and transforms the large radial voltage gradient in the cable dielectric into a much lower radial voltage gradient in the high density helium coolant at the cold end of the cryogenic bushing.

  14. Termination for a superconducting power transmission line including a horizontal cryogenic bushing

    DOEpatents

    Minati, Kurt F.; Morgan, Gerry H.; McNerney, Andrew J.; Schauer, Felix

    1984-01-01

    A termination for a superconducting power transmission line is disclosed which is comprised of a standard air entrance insulated vertical bushing with an elbow, a horizontal cryogenic bushing linking the pressurized cryogenic cable environment to the ambient temperature bushing and a stress cone which terminates the cable outer shield and transforms the large radial voltage gradient in the cable dielectric into a much lower radial voltage gradient in the high density helium coolant at the cold end of the cryogenic bushing.

  15. Design and development of 500 m long HTS cable system in the KEPCO power grid, Korea

    NASA Astrophysics Data System (ADS)

    Sohn, S. H.; Lim, J. H.; Yang, B. M.; Lee, S. K.; Jang, H. M.; Kim, Y. H.; Yang, H. S.; Kim, D. L.; Kim, H. R.; Yim, S. W.; Won, Y. J.; Hwang, S. D.

    2010-11-01

    In Korea, two long-term field demonstrations for high temperature superconducting (HTS) cable have been carried out for several years; Korea Electric Power Corporation (KEPCO) and LS Cable Ltd. (LSC) independently. Encouraged at the result of the projects performed in parallel, a new project targeting the real grid operation was launched in the fourth quarter of 2008 with the Korean government's financial support. KEPCO and LSC are jointly collaborating in the selection of substation, determination of cable specification, design of cryogenic system, and the scheme of protection coordination. A three phase 500 m long HTS cable at a distribution level voltage of 22.9 kV is to be built at 154/22.9 kV Icheon substation located in near Seoul. A hybrid cryogenic system reflecting the contingency plan is being designed including cryocoolers. The HTS cable system will be installed in the second quarter of 2010, being commissioned by the fall of 2010. This paper describes the objectives of the project and design issues of the cable and cryogenic system in detail.

  16. Characteristic Analysis of DC Electric Railway Systems with Superconducting Power Cables Connecting Power Substations

    NASA Astrophysics Data System (ADS)

    Ohsaki, H.; Matsushita, N.; Koseki, T.; Tomita, M.

    2014-05-01

    The application of superconducting power cables to DC electric railway systems has been studied. It could leads to an effective use of regenerative brake, improved energy efficiency, effective load sharing among the substations, etc. In this study, an electric circuit model of a DC feeding system is built and numerical simulation is carried out using MATLAB-Simulink software. A modified electric circuit model with an AC power grid connection taken into account is also created to simulate the influence of the grid connection. The analyses have proved that a certain amount of energy can be conserved by introducing superconducting cables, and that electric load distribution and concentration among the substations depend on the substation output voltage distribution.

  17. Modular Seafloor and Water Column Systems for the Ocean Observatories Initiative Cabled Array

    NASA Astrophysics Data System (ADS)

    Delaney, J. R.; Manalang, D.; Harrington, M.; Tilley, J.; Dosher, J.; Cram, G.; Harkins, G.; McGuire, C.; Waite, P.; McRae, E.; McGinnis, T.; Kenney, M.; Siani, C.; Michel-Hart, N.; Denny, S.; Boget, E.; Kawka, O. E.; Daly, K. L.; Luther, D. S.; Kelley, D. S.; Milcic, M.

    2016-02-01

    Over the past decade, cabled ocean observatories have become an increasingly important way to collect continuous real-time data at remote subsea locations. This has led to the development of a class of subsea systems designed and built specifically to distribute power and bandwidth among sensing instrumentation on the seafloor and throughout the water column. Such systems are typically powered by shore-based infrastructure and involve networks of fiber optic and electrical cabling that provide real-time data access and control of remotely deployed instrumentation. Several subsea node types were developed and/or adapted for cabled use in order to complete the installation of the largest North American scientific cabled observatory in Oct, 2014. The Ocean Observatories Initiative (OOI) Cabled Array, funded by the US National Science Foundation, consists of a core infrastructure that includes 900 km of fiber optic/electrical cables, seven primary nodes, 18 seafloor junction boxes, three mooring-mounted winched profiling systems, and three wire-crawling profiler systems. In aggregate, the installed infrastructure has 200 dedicated scientific instrument ports (of which 120 are currently assigned), and is capable of further expansion. The installed system has a 25-year design life for reliable, sustained monitoring; and all nodes, profilers and instrument packages are ROV-serviceable. Now in it's second year of operation, the systems that comprise the Cabled Array are providing reliable, 24/7 real-time data collection from deployed instrumentation, and offer a modular and scalable class of subsea systems for ocean observing. This presentation will provide an overview of the observatory-class subsystems of the OOI Cabled Array, focusing on the junction boxes, moorings and profilers that power and communicate with deployed instrumentation.

  18. Current evaluation of hydraulics to replace the cable force transmission system for body-powered upper-limb prostheses.

    PubMed

    LeBlanc, M

    1990-01-01

    Present body-powered upper-limb prostheses use a cable control system employing World War II aircraft technology to transmit force from the body to the prosthesis for operation. The cable and associated hardware are located outside the prosthesis. Because individuals with arm amputations want prostheses that are natural looking with a smooth, soft outer surface, a design and development project was undertaken to replace the cable system with hydraulics located inside the prosthesis. Three different hydraulic transmission systems were built for evaluation, and other possibilities were explored. Results indicate that a hydraulic force transmission system remains an unmet challenge as a practical replacement for the cable system. The author was unable to develop a hydraulic system that meets the necessary dynamic requirements and is acceptable in size and appearance.

  19. 30 CFR 56.12014 - Handling energized power cables.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Handling energized power cables. 56.12014 Section 56.12014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity...

  20. 30 CFR 56.12014 - Handling energized power cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Handling energized power cables. 56.12014 Section 56.12014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity...

  1. 30 CFR 56.12014 - Handling energized power cables.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Handling energized power cables. 56.12014 Section 56.12014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity...

  2. 30 CFR 56.12014 - Handling energized power cables.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Handling energized power cables. 56.12014 Section 56.12014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity...

  3. 30 CFR 56.12014 - Handling energized power cables.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Handling energized power cables. 56.12014 Section 56.12014 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity...

  4. 18 CFR 157.213 - Underground storage field facilities.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Underground storage... of the Natural Gas Act for Certain Transactions and Abandonment § 157.213 Underground storage field... operate facilities for the remediation and maintenance of an existing underground storage facility...

  5. 18 CFR 157.213 - Underground storage field facilities.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Underground storage... of the Natural Gas Act for Certain Transactions and Abandonment § 157.213 Underground storage field... operate facilities for the remediation and maintenance of an existing underground storage facility...

  6. An algorithm for power line detection and warning based on a millimeter-wave radar video.

    PubMed

    Ma, Qirong; Goshi, Darren S; Shih, Yi-Chi; Sun, Ming-Ting

    2011-12-01

    Power-line-strike accident is a major safety threat for low-flying aircrafts such as helicopters, thus an automatic warning system to power lines is highly desirable. In this paper we propose an algorithm for detecting power lines from radar videos from an active millimeter-wave sensor. Hough Transform is employed to detect candidate lines. The major challenge is that the radar videos are very noisy due to ground return. The noise points could fall on the same line which results in signal peaks after Hough Transform similar to the actual cable lines. To differentiate the cable lines from the noise lines, we train a Support Vector Machine to perform the classification. We exploit the Bragg pattern, which is due to the diffraction of electromagnetic wave on the periodic surface of power lines. We propose a set of features to represent the Bragg pattern for the classifier. We also propose a slice-processing algorithm which supports parallel processing, and improves the detection of cables in a cluttered background. Lastly, an adaptive algorithm is proposed to integrate the detection results from individual frames into a reliable video detection decision, in which temporal correlation of the cable pattern across frames is used to make the detection more robust. Extensive experiments with real-world data validated the effectiveness of our cable detection algorithm. © 2011 IEEE

  7. Electrothermal Action of the Pulse of the Current of a Short Artificial-Lightning Stroke on Test Specimens of Wires and Cables of Electric Power Objects

    NASA Astrophysics Data System (ADS)

    Baranov, M. I.; Rudakov, S. V.

    2018-03-01

    The authors have given results of investigations of the electrothermal action of aperiodic pulses of temporal shape 10/350 μs of the current of a short artificial-lightning stroke on test specimens of electric wires and cables with copper and aluminum cores and sheaths with polyvinylchloride and polyethylene insulations of power circuits of industrial electric power objects. It has been shown that the thermal stability of such wires and cables is determined by the action integral of the indicated current pulse. The authors have found the maximum permissible and critical densities of this pulse in copper and aluminum current-carrying parts of the wires and cables. High-current experiments conducted under high-voltage laboratory conditions on a unique generator of 10/350 μs pulses of an artificial-lightning current with amplitude-time parameters normalized according to the existing requirements of international and national standards and with tolerances on them have confirmed the reliability of the proposed calculated estimate for thermal lightning resistance of cabling and wiring products.

  8. Electrothermal Action of the Pulse of the Current of a Short Artificial-Lightning Stroke on Test Specimens of Wires and Cables of Electric Power Objects

    NASA Astrophysics Data System (ADS)

    Baranov, M. I.; Rudakov, S. V.

    2018-05-01

    The authors have given results of investigations of the electrothermal action of aperiodic pulses of temporal shape 10/350 μs of the current of a short artificial-lightning stroke on test specimens of electric wires and cables with copper and aluminum cores and sheaths with polyvinylchloride and polyethylene insulations of power circuits of industrial electric power objects. It has been shown that the thermal stability of such wires and cables is determined by the action integral of the indicated current pulse. The authors have found the maximum permissible and critical densities of this pulse in copper and aluminum current-carrying parts of the wires and cables. High-current experiments conducted under high-voltage laboratory conditions on a unique generator of 10/350 μs pulses of an artificial-lightning current with amplitude-time parameters normalized according to the existing requirements of international and national standards and with tolerances on them have confirmed the reliability of the proposed calculated estimate for thermal lightning resistance of cabling and wiring products.

  9. Electrical cable utilization for wave energy converters

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bull, Diana; Baca, Michael; Schenkman, Benjamin

    Here, this paper investigates the suitability of sizing the electrical export cable based on the rating of the contributing WECs within a farm. These investigations have produced a new methodology to evaluate the probabilities associated with peak power values on an annual basis. It has been shown that the peaks in pneumatic power production will follow an exponential probability function for a linear model. A methodology to combine all the individual probability functions into an annual view has been demonstrated on pneumatic power production by a Backward Bent Duct Buoy (BBDB). These investigations have also resulted in a highly simplifiedmore » and perfunctory model of installed cable cost as a function of voltage and conductor cross-section. This work solidifies the need to determine electrical export cable rating based on expected energy delivery as opposed to device rating as small decreases in energy delivery can result in cost savings.« less

  10. Electrical cable utilization for wave energy converters

    DOE PAGES

    Bull, Diana; Baca, Michael; Schenkman, Benjamin

    2018-04-27

    Here, this paper investigates the suitability of sizing the electrical export cable based on the rating of the contributing WECs within a farm. These investigations have produced a new methodology to evaluate the probabilities associated with peak power values on an annual basis. It has been shown that the peaks in pneumatic power production will follow an exponential probability function for a linear model. A methodology to combine all the individual probability functions into an annual view has been demonstrated on pneumatic power production by a Backward Bent Duct Buoy (BBDB). These investigations have also resulted in a highly simplifiedmore » and perfunctory model of installed cable cost as a function of voltage and conductor cross-section. This work solidifies the need to determine electrical export cable rating based on expected energy delivery as opposed to device rating as small decreases in energy delivery can result in cost savings.« less

  11. New Opportunities for Cabled Ocean Observatories

    NASA Astrophysics Data System (ADS)

    Duennebier, F. K.; Butler, R.; Karl, D. M.; Roger, L. B.

    2002-12-01

    With the decommissioning of transoceanic telecommunications cables as they become obsolete or uneconomical, there is an opportunity to use these systems for ocean observatories. Two coaxial cables, TPC-1 and HAW-2 are currently in use for observatories, and another, ANZCAN, is scheduled to be used beginning in 2004 to provide a cabled observatory at Station ALOHA, north of Oahu. The ALOHA observatory will provide several Mb/s data rates and about 1 kW of power to experiments installed at Station ALOHA. Sensors can be installed either by wet mateable connection to a junction box on the ocean floor using an ROV, or by acoustic data link to the system. In either case real-time data will be provided to users over the Internet. A Small Experiment Module, to be first installed at the Hawaii-2 Observatory, and later at Station ALOHA, will provide relatively cheap and uncomplicated access to the observatories for relatively simple sensors. Within the next few years, the first electro-optical cables installed in the 1980's will be decommissioned and could be available for scientific use. These cables could provide long "extension cords" (thousands of km) with very high bandwidth and reasonable power to several observatories in remote locations in the ocean. While they could be used in-place, a more exciting scenario is to use cable ships to pick up sections of cable and move them to locations of higher scientific interest. While such moves would not be cheap, the costs would rival the cost of installation and maintenance of a buoyed observatory, with far more bandwidth and power available for science use.

  12. Apparatus including a plurality of spaced transformers for locating short circuits in cables

    NASA Technical Reports Server (NTRS)

    Cason, R. L.; Mcstay, J. J. (Inventor)

    1978-01-01

    A cable fault locator is described for sensing faults such as short circuits in power cables. The apparatus includes a plurality of current transformers strategically located along a cable. Trigger circuits are connected to each of the current transformers for placing a resistor in series with a resistive element responsive to an abnormally high current flowing through that portion of the cable. By measuring the voltage drop across the resistive element, the location of the fault can be determined.

  13. Status Report and Research Plan for Cables Harvested from Crystal River Unit 3 Nuclear Generating Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fifield, Leonard S.

    Harvested cables from operating or decommissioned nuclear power plants present an important opportunity to validate models, understanding material aging behavior, and validate characterization techniques. Crystal River Unit 3 Nuclear Generating Plant is a pressurized water reactor that was licensed to operate from 1976 to 2013. Cable segments were harvested and made available to the Light Water Reactor Sustainability research program through the Electric Power Research Institute. Information on the locations and circuits within the reactor from whence the cable segments came, cable construction, sourcing and installation information, and photographs of the cable locations prior to harvesting were provided. The cablemore » variations provided represent six of the ten most common cable insulations in the nuclear industry and experienced service usage for periods from 15 to 42 years. Subsequently, these cables constitute a valuable asset for research to understand aging behavior and measurement of nuclear cables. Received cables harvested from Crystal River Unit 3 Nuclear Generating Plant consist of low voltage, insulated conductor surrounded by jackets in lengths from 24 to 100 feet each. Cable materials will primarily be used to investigate aging under simultaneous thermal and gamma radiation exposure. Each cable insulation and jacket material will be characterized in its as-received condition, including determination of the temperatures associated with endothermic transitions in the material using differential scanning calorimetry and dynamic mechanical analysis. Temperatures for additional thermal exposure aging will be selected following the thermal analysis to avoid transitions in accelerated laboratory aging that do not occur in field conditions. Aging temperatures above thermal transitions may also be targeted to investigate the potential for artifacts in lifetime prediction from rapid accelerated aging. Total gamma doses and dose rates targeted for each material will be determined based on filling gaps in prior work, known limits of material classes and resource constraints. Experimental plans will be developed in the context of existing data for the insulation and jacket materials available in published Department of Energy and Electric Power Research Institute reports toward addressing identified knowledge gaps.« less

  14. 30 CFR 57.4461 - Gasoline use restrictions underground.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Gasoline use restrictions underground. 57.4461... Prevention and Control Flammable and Combustible Liquids and Gases § 57.4461 Gasoline use restrictions underground. If gasoline is used underground to power internal combustion engines— (a) The mine shall be...

  15. 30 CFR 57.4461 - Gasoline use restrictions underground.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Gasoline use restrictions underground. 57.4461... Prevention and Control Flammable and Combustible Liquids and Gases § 57.4461 Gasoline use restrictions underground. If gasoline is used underground to power internal combustion engines— (a) The mine shall be...

  16. 30 CFR 57.4461 - Gasoline use restrictions underground.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Gasoline use restrictions underground. 57.4461... Prevention and Control Flammable and Combustible Liquids and Gases § 57.4461 Gasoline use restrictions underground. If gasoline is used underground to power internal combustion engines— (a) The mine shall be...

  17. 30 CFR 57.4461 - Gasoline use restrictions underground.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Gasoline use restrictions underground. 57.4461... Prevention and Control Flammable and Combustible Liquids and Gases § 57.4461 Gasoline use restrictions underground. If gasoline is used underground to power internal combustion engines— (a) The mine shall be...

  18. 30 CFR 75.1902 - Underground diesel fuel storage-general requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Underground diesel fuel storage-general... LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1902 Underground diesel fuel storage—general requirements. (a) All diesel fuel must be stored...

  19. 30 CFR 75.1902 - Underground diesel fuel storage-general requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Underground diesel fuel storage-general... LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1902 Underground diesel fuel storage—general requirements. (a) All diesel fuel must be stored...

  20. 30 CFR 56.12013 - Splices and repairs of power cables.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Splices and repairs of power cables. 56.12013 Section 56.12013 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity...

  1. 30 CFR 56.12013 - Splices and repairs of power cables.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Splices and repairs of power cables. 56.12013 Section 56.12013 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity...

  2. 30 CFR 56.12013 - Splices and repairs of power cables.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Splices and repairs of power cables. 56.12013 Section 56.12013 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity...

  3. 30 CFR 56.12013 - Splices and repairs of power cables.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Splices and repairs of power cables. 56.12013 Section 56.12013 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity...

  4. 30 CFR 56.12013 - Splices and repairs of power cables.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Splices and repairs of power cables. 56.12013 Section 56.12013 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR METAL AND NONMETAL MINE SAFETY AND HEALTH SAFETY AND HEALTH STANDARDS-SURFACE METAL AND NONMETAL MINES Electricity...

  5. 47 CFR 27.1202 - Cable/BRS cross-ownership.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES Broadband Radio Service and Educational Broadband Service § 27... modifications, assignments or transfers of control by cable operators of BRS stations shall include a showing... who holds or shares the power to vote such stock, to any person who has the sole power to sell such...

  6. 77 FR 13191 - Airworthiness Directives; Bombardier, Inc. Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... corrosion and inadequate silver-plating. This AD requires replacing ADG power feeder cables. We are issuing this AD to prevent galvanic corrosion on ADG power feeder cables, which could result in damage to the... damaged due to galvanic corrosion. It was subsequently determined that the silver- plating is inadequate...

  7. Cable Television and the University.

    ERIC Educational Resources Information Center

    Lyman, Richard

    Universities contain powerful blocs of resistance to new educational technology, perhaps especially to television. University attitudes and structures as well as faculty ignorance, apathy, and resistance affect the development of cable television. No one seems to speak with great confidence and precision about the educational potential of cable.…

  8. 46 CFR 129.340 - Cable and wiring.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Cable and wiring. 129.340 Section 129.340 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) OFFSHORE SUPPLY VESSELS ELECTRICAL INSTALLATIONS Power Sources and Distribution Systems § 129.340 Cable and wiring. (a) If individual wires, rather than...

  9. 30 CFR 72.502 - Requirements for nonpermissible light-duty diesel-powered equipment other than generators and...

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... diesel-powered equipment other than generators and compressors. 72.502 Section 72.502 Mineral Resources... FOR COAL MINES Diesel Particulate Matter-Underground Areas of Underground Coal Mines § 72.502 Requirements for nonpermissible light-duty diesel-powered equipment other than generators and compressors. (a...

  10. 30 CFR 72.502 - Requirements for nonpermissible light-duty diesel-powered equipment other than generators and...

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... diesel-powered equipment other than generators and compressors. 72.502 Section 72.502 Mineral Resources... FOR COAL MINES Diesel Particulate Matter-Underground Areas of Underground Coal Mines § 72.502 Requirements for nonpermissible light-duty diesel-powered equipment other than generators and compressors. (a...

  11. Development of a PLC modem for data transmission over a PWM power supply

    NASA Astrophysics Data System (ADS)

    Batard, Christophe; Ginot, Nicolas; Mannah, Marc Anthony; Millet, Christophe; Poitiers, Frédéric

    2014-04-01

    In variable-speed electrical drive and online conditioning monitoring, a feedback loop is required in order to transmit the sensor information from the motor to the controller close to the inverter. Additional cabling is used for signalling. This extra cabling has a significant cost and data transmission may not be reliable. Thus, the use of power line communication (PLC) technology to transmit data in motor drive application is quite interesting. The use of a PLC modem dedicated to the home network in a three-phase inverter-fed motor power cable does not work. Therefore, specific coupling interfaces are developed to transmit data through a pulse-width modulated power supply. Laboratory tests have shown that the couplers are operating properly. They ensure reliable data transmission in a motor drive application.

  12. Ferrite core coupled slapper detonator apparatus and method

    DOEpatents

    Boberg, Ralph E.; Lee, Ronald S.; Weingart, Richard C.

    1989-01-01

    Method and apparatus are provided for coupling a temporally short electric power pulse from a thick flat-conductor power cable into a thin flat-conductor slapper detonator circuit. A first planar and generally circular loop is formed from an end portion of the power cable. A second planar and generally circular loop, of similar diameter, is formed from all or part of the slapper detonator circuit. The two loops are placed together, within a ferrite housing that provides a ferrite path that magnetically couples the two loops. Slapper detonator parts may be incorporated within the ferrite housing. The ferrite housing may be made vacuum and water-tight, with the addition of a hermetic ceramic seal, and provided with an enclosure for protecting the power cable and parts related thereto.

  13. Ferrite core coupled slapper detonator apparatus and method

    DOEpatents

    Boberg, R.E.; Lee, R.S.; Weingart, R.C.

    1989-08-01

    Method and apparatus are provided for coupling a temporally short electric power pulse from a thick flat-conductor power cable into a thin flat-conductor slapper detonator circuit. A first planar and generally circular loop is formed from an end portion of the power cable. A second planar and generally circular loop, of similar diameter, is formed from all or part of the slapper detonator circuit. The two loops are placed together, within a ferrite housing that provides a ferrite path that magnetically couples the two loops. Slapper detonator parts may be incorporated within the ferrite housing. The ferrite housing may be made vacuum and water-tight, with the addition of a hermetic ceramic seal, and provided with an enclosure for protecting the power cable and parts related thereto. 10 figs.

  14. Electrical aging markers for EPR-based low-voltage cable insulation wiring of nuclear power plants

    NASA Astrophysics Data System (ADS)

    Verardi, L.; Fabiani, D.; Montanari, G. C.

    2014-01-01

    This paper presents results of electrical property measurements on EPR-based insulations of low-voltage power cables used in nuclear power plants. The specimens underwent accelerated aging through the simultaneous application of high temperature and gamma-radiation. Mechanical properties and the dielectric response at different frequencies were investigated. Results showed significant variation of the electrical and mechanical properties of aged cables at low frequencies, i.e. lower than 10-2 Hz. In particular, the real and imaginary parts of permittivity increase with aging time, accumulated dose and stress levels applied showing good correlation with elongation at break, which decreases as a function of extent of insulation aging.

  15. 30 CFR 57.22310 - Electrical cables (I-C mines).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Standards for Methane in Metal and Nonmetal Mines Equipment § 57.22310 Electrical cables (I-C mines). Electrical cables used to power submersible sump pumps shall be accepted or approved by MSHA as flame... be sealed to prevent entry of explosive gas or dust. [57 FR 61223, Dec. 23, 1992] ...

  16. 30 CFR 57.22310 - Electrical cables (I-C mines).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Standards for Methane in Metal and Nonmetal Mines Equipment § 57.22310 Electrical cables (I-C mines). Electrical cables used to power submersible sump pumps shall be accepted or approved by MSHA as flame... be sealed to prevent entry of explosive gas or dust. [57 FR 61223, Dec. 23, 1992] ...

  17. 30 CFR 57.22310 - Electrical cables (I-C mines).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Standards for Methane in Metal and Nonmetal Mines Equipment § 57.22310 Electrical cables (I-C mines). Electrical cables used to power submersible sump pumps shall be accepted or approved by MSHA as flame... be sealed to prevent entry of explosive gas or dust. [57 FR 61223, Dec. 23, 1992] ...

  18. 30 CFR 57.22310 - Electrical cables (I-C mines).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Standards for Methane in Metal and Nonmetal Mines Equipment § 57.22310 Electrical cables (I-C mines). Electrical cables used to power submersible sump pumps shall be accepted or approved by MSHA as flame... be sealed to prevent entry of explosive gas or dust. [57 FR 61223, Dec. 23, 1992] ...

  19. 30 CFR 57.22310 - Electrical cables (I-C mines).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Standards for Methane in Metal and Nonmetal Mines Equipment § 57.22310 Electrical cables (I-C mines). Electrical cables used to power submersible sump pumps shall be accepted or approved by MSHA as flame... be sealed to prevent entry of explosive gas or dust. [57 FR 61223, Dec. 23, 1992] ...

  20. 47 CFR 76.943 - Fines.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TELEVISION SERVICE Cable Rate Regulation § 76.943 Fines. (a) A franchising authority may impose fines or... specifically at the cable operator, provided the franchising authority has such power under state or local laws. (b) If a cable operator willfully fails to comply with the terms of any franchising authority's order...

  1. 46 CFR 116.202 - Plans and information required.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Safety Center, 2100 2nd St. SW., Stop 7102, Washington, DC 20593-7102, in a written or electronic format... cables, bus-tie cables, feeders, and branch circuit cables; (vi) Power, lighting, and interior communication panelboards with number of circuits and rating of energy consuming devices; (vii) Type and...

  2. 46 CFR 116.202 - Plans and information required.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Safety Center, 2100 2nd St. SW., Stop 7102, Washington, DC 20593-7102, in a written or electronic format... cables, bus-tie cables, feeders, and branch circuit cables; (vi) Power, lighting, and interior communication panelboards with number of circuits and rating of energy consuming devices; (vii) Type and...

  3. 46 CFR 116.202 - Plans and information required.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... electronic format. Information for submitting the VSP electronically can be found at http://www.uscg.mil/HQ... movers; (v) Type and size of generator cables, bus-tie cables, feeders, and branch circuit cables; (vi) Power, lighting, and interior communication panelboards with number of circuits and rating of energy...

  4. 46 CFR 116.202 - Plans and information required.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... electronic format. Information for submitting the VSP electronically can be found at http://www.uscg.mil/HQ... movers; (v) Type and size of generator cables, bus-tie cables, feeders, and branch circuit cables; (vi) Power, lighting, and interior communication panelboards with number of circuits and rating of energy...

  5. Towards aging mechanisms of cross-linked polyethylene (XLPE) cable insulation materials in nuclear power plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liu, Shuaishuai; Fifield, Leonard S.; Bowler, Nicola

    Cross-linked polyethylene (XLPE) cable insulation material undergoes simultaneous, accelerated thermal and gamma-radiation aging to simulate the long-term aging environment within nuclear power plants (NPPs). A variety of materials characterization tests, including scanning electron microscopy, thermo-gravimetric analysis, differential scanning calorimetry, oxidation induction time, gel-fraction and dielectric properties measurement, are conducted on pristine and differently aged XLPE samples. A preliminary model of one possible aging mechanism of XLPE cable insulation material under gamma radiation at elevated temperature of 115 °C is suggested.

  6. New Technologies for Repairing Aging Cables in Nuclear Power Plants: M3LW-14OR0404015 Cable Rejuvenation Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simmons, Kevin L.; Fifield, Leonard S.; Westman, Matthew P.

    The goal of this project is to conceptually demonstrate techniques to repair cables that have degraded through subjection to long-term thermal and radiation exposure in nuclear power plants. In fiscal year 2014 (FY14) we focused on commercially available ethylene-propylene rubber (EPR) as the relevant test material, isolated a high surface area form of the EPR material to facilitate chemical treatment screening and charaterization, and measured chemical changes in the material due to aging and treatment using Fourier Transfrom Infrared (FTIR) spectroscopy.

  7. Rotating Connection for Electrical Cables

    NASA Technical Reports Server (NTRS)

    Manges, D. R.

    1986-01-01

    Cable reel provides electrical connections between fixed structure and rotating one. Reel carries power and signal lines while allowing rotating structure to turn up to 360 degrees with respect to fixed structure. Reel replaces sliprings. Can be used to electrically connect arm of robot with body. Reel releases cable to rotating part as it turns and takes up cable as rotating part comes back to its starting position, without tangling, twisting, or kinking.

  8. Design, development, fabrication and testing of high temperature Flat Conductor Cable (FCC)

    NASA Technical Reports Server (NTRS)

    Rigling, W. S.

    1974-01-01

    The results are presented of a development program for a flat, 25-conductor signal cable and a flat, 3-conductor power cable. Flat cables employ conductors made of strips or flattened round copper conductors insulated with polyimide films. It is shown that conductor thickness ranges from 0.003 to 0.010 inch, and begins to soften and loose mechanical strength at temperatures above 200 C.

  9. Dimensioning appropriate technical and economic parameters of elements in urban distribution power nets based on discrete fast marching method

    NASA Astrophysics Data System (ADS)

    Afanasyev, A. P.; Bazhenov, R. I.; Luchaninov, D. V.

    2018-05-01

    The main purpose of the research is to develop techniques for defining the best technical and economic trajectories of cables in urban power systems. The proposed algorithms of calculation of the routes for laying cables take into consideration topological, technical and economic features of the cabling. The discrete option of an algorithm Fast marching method is applied as a calculating tool. It has certain advantages compared to other approaches. In particular, this algorithm is cost-effective to compute, therefore, it is not iterative. Trajectories of received laying cables are considered as optimal ones from the point of view of technical and economic criteria. They correspond to the present rules of modern urban development.

  10. Type B investigation of electrical fault in 351 Substation, December 4, 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Debban, H.L.; Shearer, C.A.; Boger, R.M.

    1995-02-01

    On December 4, 1994, at 2132:10 hours, an electrical failure of a cable-tapping splice resulted in a fire in the 300 Area of the DOE Hanford Site. The fire occurred in the yard of Substation 351 in electrical Vault R122V, where the cable-tapping splice was located. The fire incinerated all cables passing to and through the vault causing them to fail. The failure of the cables resulted in a power outage to twenty customers in the 300 Area. The vault was electrically isolated, and power was restored to the electrical distribution system at 2311 hours. This report contains the accidentmore » scenario, accident analysis, direct cause and root and contributing causes.« less

  11. Parametric analysis of hollow conductor parallel and coaxial transmission lines for high frequency space power distribution

    NASA Technical Reports Server (NTRS)

    Jeffries, K. S.; Renz, D. D.

    1984-01-01

    A parametric analysis was performed of transmission cables for transmitting electrical power at high voltage (up to 1000 V) and high frequency (10 to 30 kHz) for high power (100 kW or more) space missions. Large diameter (5 to 30 mm) hollow conductors were considered in closely spaced coaxial configurations and in parallel lines. Formulas were derived to calculate inductance and resistance for these conductors. Curves of cable conductance, mass, inductance, capacitance, resistance, power loss, and temperature were plotted for various conductor diameters, conductor thickness, and alternating current frequencies. An example 5 mm diameter coaxial cable with 0.5 mm conductor thickness was calculated to transmit 100 kW at 1000 Vac, 50 m with a power loss of 1900 W, an inductance of 1.45 micron and a capacitance of 0.07 micron-F. The computer programs written for this analysis are listed in the appendix.

  12. Military Curricula for Vocational & Technical Education. Construction Electrician/Power and Communications Cable Splicing, 5-3.

    ERIC Educational Resources Information Center

    Ohio State Univ., Columbus. National Center for Research in Vocational Education.

    This curriculum outline, instructor's guide, and student's guide for a secondary-postsecondary-level course in construction electrician/power and communications cable splicing are one of a number of military-developed curriculum packages developed for adaptation to vocational instruction and curriculum development in a civilian setting. Purpose…

  13. 46 CFR 28.865 - Wiring methods and materials.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    .... (e) Cable and wire for power and lighting circuits must: (1) For circuits of less than 50 volts, meet... FISHING INDUSTRY VESSELS Aleutian Trade Act Vessels § 28.865 Wiring methods and materials. (a) All cable... the circuit. (b) Each conductor must be No. 22 AWG or larger. Conductors in power and lighting...

  14. 46 CFR 28.865 - Wiring methods and materials.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    .... (e) Cable and wire for power and lighting circuits must: (1) For circuits of less than 50 volts, meet... FISHING INDUSTRY VESSELS Aleutian Trade Act Vessels § 28.865 Wiring methods and materials. (a) All cable... the circuit. (b) Each conductor must be No. 22 AWG or larger. Conductors in power and lighting...

  15. 46 CFR 28.865 - Wiring methods and materials.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    .... (e) Cable and wire for power and lighting circuits must: (1) For circuits of less than 50 volts, meet... FISHING INDUSTRY VESSELS Aleutian Trade Act Vessels § 28.865 Wiring methods and materials. (a) All cable... the circuit. (b) Each conductor must be No. 22 AWG or larger. Conductors in power and lighting...

  16. 46 CFR 28.865 - Wiring methods and materials.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    .... (e) Cable and wire for power and lighting circuits must: (1) For circuits of less than 50 volts, meet... FISHING INDUSTRY VESSELS Aleutian Trade Act Vessels § 28.865 Wiring methods and materials. (a) All cable... the circuit. (b) Each conductor must be No. 22 AWG or larger. Conductors in power and lighting...

  17. Detection of Local Temperature Change on HTS Cables via Time-Frequency Domain Reflectometry

    NASA Astrophysics Data System (ADS)

    Bang, Su Sik; Lee, Geon Seok; Kwon, Gu-Young; Lee, Yeong Ho; Ji, Gyeong Hwan; Sohn, Songho; Park, Kijun; Shin, Yong-June

    2017-07-01

    High temperature superconducting (HTS) cables are drawing attention as transmission and distribution cables in future grid, and related researches on HTS cables have been conducted actively. As HTS cables have come to the demonstration stage, failures of cooling systems inducing quench phenomenon of the HTS cables have become significant. Several diagnosis of the HTS cables have been developed but there are still some limitations of the experimental setup. In this paper, a non-destructive diagnostic technique for the detection of the local temperature change point is proposed. Also, a simulation model of HTS cables with a local temperature change point is suggested to verify the proposed diagnosis. The performance of the diagnosis is checked by comparative analysis between the proposed simulation results and experiment results of a real-world HTS cable. It is expected that the suggested simulation model and diagnosis will contribute to the commercialization of HTS cables in the power grid.

  18. Measurement of RF propagation around corners in underground mines and tunnels

    PubMed Central

    Jacksha, R.; Zhou, C.

    2017-01-01

    This paper reports measurement results for radio frequency (RF) propagation around 90° corners in tunnels and underground mines, for vertically, horizontally and longitudinally polarized signals. Measurements of signal power attenuation from a main entry into a crosscut were performed at four frequencies — 455, 915, 2450 and 5800 MHz — that are common to underground radio communication systems. From the measurement data, signal power loss was determined as a function of signal coupling from the main entry into the crosscut. The resultant power loss data show there are many factors that contribute to power attenuation from a main entry into a crosscut, including frequency, antenna polarization and cross-sectional entry dimensions. PMID:28626351

  19. Measurement of RF propagation around corners in underground mines and tunnels.

    PubMed

    Jacksha, R; Zhou, C

    2016-01-01

    This paper reports measurement results for radio frequency (RF) propagation around 90° corners in tunnels and underground mines, for vertically, horizontally and longitudinally polarized signals. Measurements of signal power attenuation from a main entry into a crosscut were performed at four frequencies - 455, 915, 2450 and 5800 MHz - that are common to underground radio communication systems. From the measurement data, signal power loss was determined as a function of signal coupling from the main entry into the crosscut. The resultant power loss data show there are many factors that contribute to power attenuation from a main entry into a crosscut, including frequency, antenna polarization and cross-sectional entry dimensions.

  20. Rotary high power transfer apparatus

    NASA Technical Reports Server (NTRS)

    Jacobson, Peter E. (Inventor); Porter, Ryan S. (Inventor)

    1987-01-01

    An apparatus for reducing terminal-to-terminal circuit resistance and enhancing heat transfer in a rotary power transfer apparatus of the roll ring type comprising a connecting thimble for attaching an external power cable to a cone shaped terminal which is attached to a tab integral to an outer ring. An inner ring having a spherical recess mates with the spherical end of a tie connector. A cone shaped terminal is fitted to a second connecting thimble for attaching a second external power cable.

  1. VEHICLE FOR SLAVE ROBOT

    DOEpatents

    Goertz, R.C.; Lindberg, J.F.

    1962-01-30

    A reeling device is designed for an electrical cable supplying power to the slave slde of a remote control manipulator mounted on a movable vehicle. As the vehicle carries the slave side about in a closed room, the device reels the cable in and out to maintain a variable length of the cable between the vehicle and a cable inlet in the wall of the room. The device also handles a fixed length of cable between the slave side and the vehicle, in spite of angular movement of the slave side with respect to the vehicle. (AEC)

  2. Variable Frequency Operations of an Offshore Wind Power Plant with HVDC-VSC: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gevorgian, V.; Singh, M.; Muljadi, E.

    2011-12-01

    In this paper, a constant Volt/Hz operation applied to the Type 1 wind turbine generator. Various control aspects of Type 1 generators at the plant level and at the turbine level will be investigated. Based on DOE study, wind power generation may reach 330 GW by 2030 at the level of penetration of 20% of the total energy production. From this amount of wind power, 54 GW of wind power will be generated at offshore wind power plants. The deployment of offshore wind power plants requires power transmission from the plant to the load center inland. Since this power transmissionmore » requires submarine cable, there is a need to use High-Voltage Direct Current (HVDC) transmission. Otherwise, if the power is transmitted via alternating current, the reactive power generated by the cable capacitance may cause an excessive over voltage in the middle of the transmission distance which requires unnecessary oversized cable voltage breakdown capability. The use of HVDC is usually required for transmission distance longer than 50 kilometers of submarine cables to be economical. The use of HVDC brings another advantage; it is capable of operating at variable frequency. The inland substation will be operated to 60 Hz synched with the grid, the offshore substation can be operated at variable frequency, thus allowing the wind power plant to be operated at constant Volt/Hz. In this paper, a constant Volt/Hz operation applied to the Type 1 wind turbine generator. Various control aspects of Type 1 generators at the plant level and at the turbine level will be investigated.« less

  3. Frequency Domain Reflectometry NDE for Aging Cables in Nuclear Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Glass, Samuel W.; Jones, Anthony M.; Fifield, Leonard S.

    Cable insulation polymers are among the more susceptible materials to age-related degradation within a nuclear power plant. This is recognized by both regulators and utilities, so all plants have developed cable aging management programs to detect damage before critical component failure in compliance with regulatory guidelines. Although a wide range of tools are available to evaluate cables and cable systems, cable aging management programs vary in how condition monitoring and nondestructive examinations are conducted as utilities search for the most reliable and cost-effective ways to assess cable system condition. Frequency domain reflectometry (FDR) is emerging as one valuable tool tomore » locate and assess damaged portions of a cable system with minimal cost and only requires access in most cases to one of the cable terminal ends. Since laboratory studies to evaluate the use of FDR for inspection of aged cables can be expensive and data interpretation may be confounded by multiple factors which influence results, a model-based approach is desired to parametrically investigate the effect of insulation material damage in a controlled manner. This work describes development of a physics-based FDR model which uses finite element simulations of cable segments in conjunction with cascaded circuit element simulations to efficiently study a cable system. One or more segments of the cable system model have altered physical or electrical properties which represent the degree of damage and the location of the damage in the system. This circuit model is then subjected to a simulated FDR examination. The modeling approach is verified using several experimental cases and by comparing it to a commercial simulator suitable for simulation of some cable configurations. The model is used to examine a broad range of parameters including defect length, defect profile, degree of degradation, number and location of defects, FDR bandwidth, and addition of impedance-matched extensions to minimize the end-shadow effect.« less

  4. Frequency domain reflectometry modeling for nondestructive evaluation of nuclear power plant cables

    NASA Astrophysics Data System (ADS)

    Glass, S. W.; Fifield, L. S.; Jones, A. M.; Hartman, T. S.

    2018-04-01

    Cable insulation polymers are among the more susceptible materials to age-related degradation within a nuclear power plant. This is recognized by both regulators and utilities, so all plants have developed cable aging management programs to detect damage before critical component failure in compliance with regulatory guidelines. Although a wide range of tools are available to evaluate cables and cable systems, cable aging management programs vary in how condition monitoring and nondestructive examinations are conducted as utilities search for the most reliable and cost-effective ways to assess cable system condition. Frequency domain reflectometry (FDR) is emerging as one valuable tool to locate and assess damaged portions of a cable system with minimal cost and only requires access in most cases to one of the cable terminal ends. Since laboratory studies to evaluate the use of FDR for inspection of aged cables can be expensive and data interpretation may be confounded by multiple factors which influence results, a model-based approach is desired to parametrically investigate the effect of insulation material damage in a controlled manner. This work describes development of a physics-based FDR model which uses finite element simulations of cable segments in conjunction with cascaded circuit element simulations to efficiently study a cable system. One or more segments of the cable system model have altered physical or electrical properties which represent the degree of damage and the location of the damage in the system. This circuit model is then subjected to a simulated FDR examination. The modeling approach is verified using several experimental cases and by comparing it to a commercial simulator suitable for simulation of some cable configurations. The model is used to examine a broad range of parameters including defect length, defect profile, degree of degradation, number and location of defects, FDR bandwidth, and addition of impedance-matched extensions to minimize the end-shadow effect.

  5. New method for the detection and monitoring of subsea power cable

    NASA Astrophysics Data System (ADS)

    Held, Philipp; Schneider, Jens; Feldens, Peter; Wilken, Dennis

    2016-04-01

    Marine renewable energy farms, no matter what kind of, have in common that they need a connection with the onshore power grid. Thus, not only their offshore generation facilities could have impacts on the surrounding environment, but also associated submarine power cables. These cables have to be buried in the seabed - at least in coastal heavy shipping environments - for safety reasons. Cable laying disturbs the local seafloor and the sub-bottom. Refillment of dredged sediments are expected softer than the original material and could be washed away by currents. Therefore, buried cables have to be repeatedly monitored to ensure their burial depth. This study presents a new method for efficient cable detection. A parametric echosounder system using 15 kHz as secondary frequency was adapted to investigate the angular response of sub-bottom backscatter strength of layered mud and to introduce a new method for enhanced acoustic detection of buried targets. Adaptations to achieve both vertical (0°) and non-vertical inclination of incident sound on the seabed (1-15°, 30°, 45°, and 60°) comprise mechanical tilting of the acoustic transducer and electronic beam steering. A sample data set was acquired at a study site at 18 m water depth and a flat and muddy seafloor. At this site, a 0.1 m diameter power cable is buried 1-2 m below the sea floor. Surveying the cable with vertical incidence revealed that the buried cable can hardly be discriminated against the backscatter strength of the layered mud. However, the backscatter strength of layered mud was found to strongly decrease at >3±0.5° incidence and the layered mud echo pattern vanished beyond 5°. As a consequence the visual recognition of the cable echo in acoustic images improves for higher incidence angles of 15°, 30°, 45°, and 60°. Data analysis support this visual impression. The size of the cable echo pattern was found to linearly increase with incidence, whereas the signal-to-noise ratio peaks at about 40°. At the peak, the signal-to-noise ratio is up to 2.6 times higher than at normal incidence. The effects are attributed to reflection loss from layered mud at larger incidence and to the scattering of the 0.1 m diameter buried cable. Thus, the presented method is suitable for cable detection and monitoring and can also provide information of the surrounding sedimentological strati. One of its advantages is that it is based on small and mobile transducers and is therefore useable on reasonable small survey platforms. We foresee a large potential using the presented mechanic or electronic sound inclination approach for enhanced sub-bottom classification and to better detect shallow buried acoustic scatterers like cables, pipelines, stones, dumping material (mines, waste), submerged shipwrecks, archaeological settlement remains, manganese nodules and shallow gas.

  6. 30 CFR 75.1901 - Diesel fuel requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ....1901 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1901 Diesel fuel... fuel purchased for use in diesel-powered equipment underground meets these requirements. (b) Flammable...

  7. 30 CFR 75.1901 - Diesel fuel requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....1901 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1901 Diesel fuel... fuel purchased for use in diesel-powered equipment underground meets these requirements. (b) Flammable...

  8. 30 CFR 77.805 - Cable couplers and connection boxes; minimum design requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Cable couplers and connection boxes; minimum... connection boxes; minimum design requirements. (a)(1) Couplers that are used in medium- or high-voltage power... materials other than metal. (2) Cable couplers shall be adequate for the intended current and voltage. (3...

  9. 30 CFR 77.805 - Cable couplers and connection boxes; minimum design requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Cable couplers and connection boxes; minimum... connection boxes; minimum design requirements. (a)(1) Couplers that are used in medium- or high-voltage power... materials other than metal. (2) Cable couplers shall be adequate for the intended current and voltage. (3...

  10. 46 CFR 111.60-4 - Minimum cable conductor size.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Minimum cable conductor size. 111.60-4 Section 111.60-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... conductor must be #18 AWG (0.82 mm2) or larger except— (a) Each power and lighting cable conductor must be...

  11. 46 CFR 111.60-4 - Minimum cable conductor size.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Minimum cable conductor size. 111.60-4 Section 111.60-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... conductor must be #18 AWG (0.82 mm2) or larger except— (a) Each power and lighting cable conductor must be...

  12. 46 CFR 111.60-4 - Minimum cable conductor size.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Minimum cable conductor size. 111.60-4 Section 111.60-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS... conductor must be #18 AWG (0.82 mm2) or larger except— (a) Each power and lighting cable conductor must be...

  13. Simultaneous Thermal and Gamma Radiation Aging of Electrical Cable Polymers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fifield, Leonard S.

    The polymers used for insulation in nuclear power plant electrical cables are susceptible to aging during long term operation. Elevated temperature is the primary contributor to changes in polymer structure that result loss of mechanical and electrical properties, but gamma radiation is also a significant source of degradation for polymers used within relevant plant locations. Despite many years of polymer degradation research, the combined effects of simultaneous exposure to thermal and radiation stress are not well understood. As nuclear operators contemplate and prepare for extended operations beyond initial license periods, a predictive understanding of exposure-based cable material degradation is becomingmore » an increasingly important input to safety, licensing, operations and economic decisions. We are focusing on carefully-controlled simultaneous thermal and gamma radiation accelerating aging and characterization of the most common nuclear cable polymers to understand the relative contributions of temperature, time, dose and dose rate to changes in cable polymer material structure and properties. Improved understanding of cable performance in long term operation will help support continued sustainable nuclear power generation.« less

  14. The manufacture of flat conductor cable

    NASA Technical Reports Server (NTRS)

    Angele, W.

    1974-01-01

    The major techniques are described for fabricating flat conductor cable (FCC). Various types of FCC, including unshielded, shielded, power, and signal, in both existing and conceptual constructions, are covered.

  15. A two-hop wireless power transfer system with an efficiency-enhanced power receiver for motion-free capsule endoscopy inspection.

    PubMed

    Sun, Tianjia; Xie, Xiang; Li, Guolin; Gu, Yingke; Deng, Yangdong; Wang, Zhihua

    2012-11-01

    This paper presents a wireless power transfer system for a motion-free capsule endoscopy inspection. Conventionally, a wireless power transmitter in a specifically designed jacket has to be connected to a strong power source with a long cable. To avoid the power cable and allow patients to walk freely in a room, this paper proposes a two-hop wireless power transfer system. First, power is transferred from a floor to a power relay in the patient's jacket via strong coupling. Next, power is delivered from the power relay to the capsule via loose coupling. Besides making patients much more conformable, the proposed techniques eliminate the sources of reliability issues arisen from the moving cable and connectors. In the capsule, it is critical to enhance the power conversion efficiency. This paper develops a switch-mode rectifier (rectifying efficiency of 93.6%) and a power combination circuit (enhances combining efficiency by 18%). Thanks to the two-hop transfer mechanism and the novel circuit techniques, this system is able to transfer an average power of 24 mW and a peak power of 90 mW from the floor to a 13 mm × 27 mm capsule over a distance of 1 m with the maximum dc-to-dc power efficiency of 3.04%.

  16. Predictive aging results for cable materials in nuclear power plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gillen, K.T.; Clough, R.L.

    1990-11-01

    In this report, we provide a detailed discussion of methodology of predicting cable degradation versus dose rate, temperature, and exposure time and its application to data obtained on a number of additional nuclear power plant cable insulation (a hypalon, a silicon rubber and two ethylenetetrafluoroethylenes) and jacket (a hypalon) materials. We then show that the predicted, low-dose-rate results for our materials are in excellent agreement with long-term (7 to 9 years), low dose-rate results recently obtained for the same material types actually aged under nuclear power plant conditions. Based on a combination of the modelling and long-term results, we findmore » indications of reasonably similar degradation responses among several different commercial formulations for each of the following generic'' materials: hypalon, ethylenetetrafluoroethylene, silicone rubber and PVC. If such generic'' behavior can be further substantiated through modelling and long-term results on additional formulations, predictions of cable life for other commercial materials of the same generic types would be greatly facilitated. Finally, to aid utilities in their cable life extension decisions, we utilize our modelling results to generate lifetime prediction curves for the materials modelled to data. These curves plot expected material lifetime versus dose rate and temperature down to the levels of interest to nuclear power plant aging. 18 refs., 30 figs., 3 tabs.« less

  17. Lifetime assessment by intermittent inspection under the mixture Weibull power law model with application to XLPE cables.

    PubMed

    Hirose, H

    1997-01-01

    This paper proposes a new treatment for electrical insulation degradation. Some types of insulation which have been used under various circumstances are considered to degrade at various rates in accordance with their stress circumstances. The cross-linked polyethylene (XLPE) insulated cables inspected by major Japanese electric companies clearly indicate such phenomena. By assuming that the inspected specimen is sampled from one of the clustered groups, a mixed degradation model can be constructed. Since the degradation of the insulation under common circumstances is considered to follow a Weibull distribution, a mixture model and a Weibull power law can be combined. This is called The mixture Weibull power law model. By using the maximum likelihood estimation for the newly proposed model to Japanese 22 and 33 kV insulation class cables, they are clustered into a certain number of groups by using the AIC and the generalized likelihood ratio test method. The reliability of the cables at specified years are assessed.

  18. Mobile Centers For Secondary Power Distribution

    NASA Technical Reports Server (NTRS)

    Mears, Robert L.

    1990-01-01

    Concept for distribution of 60-Hz ac power in large building devoted to assembly and testing of equipment improves safety, reduces number of outlets and lengthy cables, and readily accommodates frequent changes in operations and configuration. Power from floor recess fed via unobtrusive cable to portable power management center. A cart containing variety of outlets and circuit breakers, wheeled to convenient location near equipment to be assembled or tested. Power distribution system presents larger range of operational configurations than fixed location. Meets tighter standards to feed computers and delicate instruments. Industrial-grade power suitable for power tools and other hardware. Three-phase and single-phase outlets available from each.

  19. Non-Rocket Missile Rope Launcher

    NASA Technical Reports Server (NTRS)

    Bolonkin, Alexander

    2002-01-01

    The method, installation, and estimation for delivering payload and missiles into outer space are presented. This method uses, in general, the engines and straight or closed-loop cables disposed on a planet surface. The installation consists of a space apparatus, power drive stations located along trajectory of the apparatus, the cables connected to the apparatus and to the power stations, a system for suspending the cable, and disconnected device. The drive stations accelerate the apparatus up to hypersonic speed. The estimations and computations show the possibility of making these projects a reality in a short period of time (see attached project: launcher for missiles and loads). The launch will be very cheap $1-$2 per LB. We need only light strong cable, which can be made from artificial fibers, whiskers, nanotubes, which exist in industry and scientific laboratories.

  20. Material Selection for Cable Gland to Improved Reliability of the High-hazard Industries

    NASA Astrophysics Data System (ADS)

    Vashchuk, S. P.; Slobodyan, S. M.; Deeva, V. S.; Vashchuk, D. S.

    2018-01-01

    The sealed cable glands (SCG) are available to ensure safest connection sheathed single wire for the hazard production facility (nuclear power plant and others) the same as pilot cable, control cables, radio-frequency cables et al. In this paper, we investigate the specifics of the material selection of SCG with the express aim of hazardous man-made facility. We discuss the safe working conditions for cable glands. The research indicates the sintering powdered metals cables provide the reliability growth due to their properties. A number of studies have demonstrated the verification of material selection. On the face of it, we make findings indicating that double glazed sealed units could enhance reliability. We had evaluated sample reliability under fire conditions, seismic load, and pressure containment failure. We used the samples mineral insulated thermocouple cable.

  1. 30 CFR 72.500 - Emission limits for permissible diesel-powered equipment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... underground coal mine after May 21, 2001 must emit no more than 2.5 grams per hour of diesel particulate... underground area of an underground coal mine must emit no more than 2.5 grams per hour of diesel particulate...

  2. 30 CFR 72.500 - Emission limits for permissible diesel-powered equipment.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... underground coal mine after May 21, 2001 must emit no more than 2.5 grams per hour of diesel particulate... underground area of an underground coal mine must emit no more than 2.5 grams per hour of diesel particulate...

  3. 30 CFR 72.500 - Emission limits for permissible diesel-powered equipment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... underground coal mine after May 21, 2001 must emit no more than 2.5 grams per hour of diesel particulate... underground area of an underground coal mine must emit no more than 2.5 grams per hour of diesel particulate...

  4. 30 CFR 72.500 - Emission limits for permissible diesel-powered equipment.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... underground coal mine after May 21, 2001 must emit no more than 2.5 grams per hour of diesel particulate... underground area of an underground coal mine must emit no more than 2.5 grams per hour of diesel particulate...

  5. Determining Remaining Useful Life of Aging Cables in Nuclear Power Plants – Interim Study FY13

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simmons, Kevin L.; Fifield, Leonard S.; Westman, Matthew P.

    2013-09-27

    The most important criterion for cable performance is its ability to withstand a design-basis accident. With nearly 1000 km of power, control, instrumentation, and other cables typically found in an NPP, it would be a significant undertaking to inspect all of the cables. Degradation of the cable jacket, electrical insulation, and other cable components is a key issue that is likely to affect the ability of the currently installed cables to operate safely and reliably for another 20 to 40 years beyond the initial operating life. The development of one or more nondestructive evaluation (NDE) techniques and supporting models thatmore » could assist in determining the remaining life expectancy of cables or their current degradation state would be of significant interest. The ability to nondestructively determine material and electrical properties of cable jackets and insulation without disturbing the cables or connections has been deemed essential. Currently, the only technique accepted by industry to measure cable elasticity (the gold standard for determining cable insulation degradation) is the indentation measurement. All other NDE techniques are used to find flaws in the cable and do not provide information to determine the current health or life expectancy. There is no single NDE technique that can satisfy all of the requirements needed for making a life-expectancy determination, but a wide range of methods have been evaluated for use in NPPs as part of a continuous evaluation program. The commonly used methods are indentation and visual inspection, but these are only suitable for easily accessible cables. Several NDE methodologies using electrical techniques are in use today for flaw detection but there are none that can predict the life of a cable. There are, however, several physical and chemical ptoperty changes in cable insulation as a result of thermal and radiation damage. In principle, these properties may be targets for advanced NDE methods to provide early warning of aging and degradation. Examples of such key indicators include changes in chemical structure, mechanical modulus, and dielectric permittivity. While some of these indicators are the basis of currently used technologies, there is a need to increase the volume of cable that may be inspected with a single measurement, and if possible, to develop techniques for in-situ inspection (i.e., while the cable is in operation). This is the focus of the present report.« less

  6. 47 CFR 11.55 - EAS operation during a State or Local Area emergency.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... leaks or liquid spills, widespread power failures, industrial explosions, and civil disorders. (1) DBS...); analog cable systems, digital cable systems, and wireless cable systems must comply with § 11.54(b)(6... programming should comply with § 11.54(b)(8). (5) Upon completion of the State or Local Area EAS transmission...

  7. Development of a Modular, Provider Customized Airway Trainer

    DTIC Science & Technology

    2015-11-25

    Instructions for Airway Model with sensors and computer ( Raspberry PI ) ........................................ 31 Appendix B: Instructions for...Appendix A: Instructions for Airway Model with sensors and computer ( Raspberry PI ) RASPBERRY PI INSTRUCTIONS 1. Connect multicolor sensor...cable and two blue sensor cables (blue sensor cable orientation does not matter) 2. Plug in power to the screen and raspberry pi ( two separate

  8. Head-mounted LED for optogenetic experiments of freely-behaving animal

    NASA Astrophysics Data System (ADS)

    Kwon, Ki Yong; Gnade, Andrew G.; Rush, Alexander D.; Patten, Craig D.

    2016-03-01

    Recent developments in optogenetics have demonstrated the ability to target specific types of neurons with sub-millisecond temporal precision via direct optical stimulation of genetically modified neurons in the brain. In most applications, the beam of a laser is coupled to an optical fiber, which guides and delivers the optical power to the region of interest. Light emitting diodes (LEDs) are an alternative light source for optogenetics and they provide many advantages over a laser based system including cost, size, illumination stability, and fast modulation. Their compact size and low power consumption make LEDs suitable light sources for a wireless optogenetic stimulation system. However, the coupling efficiency of an LED's output light into an optical fiber is lower than a laser due to its noncollimated output light. In typical chronic optogenetic experiment, the output of the light source is transmitted to the brain through a patch cable and a fiber stub implant, and this configuration requires two fiber-to-fiber couplings. Attenuation within the patch cable is potential source of optical power loss. In this study, we report and characterize a recently developed light delivery method for freely-behaving animal experiments. We have developed a head-mounted light source that maximizes the coupling efficiency of an LED light source by eliminating the need for a fiber optic cable. This miniaturized LED is designed to couple directly to the fiber stub implant. Depending on the desired optical power output, the head-mounted LED can be controlled by either a tethered (high power) or battery-powered wireless (moderate power) controller. In the tethered system, the LED is controlled through 40 gauge micro coaxial cable which is thinner, more flexible, and more durable than a fiber optic cable. The battery-powered wireless system uses either infrared or radio frequency transmission to achieve real-time control. Optical, electrical, mechanical, and thermal characteristics of the head-mounted LED were evaluated.

  9. Thermal and vibration testing of ruggedized IR-transmitting fiber cables

    NASA Astrophysics Data System (ADS)

    Busse, Lynda; Kung, Fred; Florea, Catalin; Shaw, Brandon; Aggarwal, Ishwar; Sanghera, Jas

    2013-05-01

    We present successful results obtained for thermal/ vibration testing of ruggedized, IR-transmitting chalcogenide glass fiber cables using a government facility with state-of-the-art equipment capable of MIL-SPEC environmental testing. We will also present results of a direct imprinting process to create novel "moth eye" patterned surfaces on the IR fiber cable ends that significantly reduces endface reflection losses from 17% to less than 3%. The cables with these imprinted "moth eye" ends transmit much higher IR laser power without damage than was obtained for previous cables with traditional AR coatings.

  10. NSTX Electrical Power Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    A. Ilic; E. Baker; R. Hatcher

    The National Spherical Torus Experiment (NSTX) has been designed and installed in the existing facilities at Princeton Plasma Physic Laboratory (PPPL). Most of the hardware, plant facilities, auxiliary sub-systems, and power systems originally used for the Tokamak Fusion Test Reactor (TFTR) have been used with suitable modifications to reflect NSTX needs. The design of the NSTX electrical power system was tailored to suit the available infrastructure and electrical equipment on site. Components were analyzed to verify their suitability for use in NSTX. The total number of circuits and the location of the NSTX device drove the major changes in themore » Power system hardware. The NSTX has eleven (11) circuits to be fed as compared to the basic three power loops for TFTR. This required changes in cabling to insure that each cable tray system has the positive and negative leg of cables in the same tray. Also additional power cabling had to be installed to the new location. The hardware had to b e modified to address the need for eleven power loops. Power converters had to be reconnected and controlled in anti-parallel mode for the Ohmic heating and two of the Poloidal Field circuits. The circuit for the Coaxial Helicity Injection (CHI) System had to be carefully developed to meet this special application. Additional Protection devices were designed and installed for the magnet coils and the CHI. The thrust was to making the changes in the most cost-effective manner without compromising technical requirements. This paper describes the changes and addition to the Electrical Power System components for the NSTX magnet systems.« less

  11. Light Water Reactor Sustainability (LWRS) Program – Non-Destructive Evaluation (NDE) R&D Roadmap for Determining Remaining Useful Life of Aging Cables in Nuclear Power Plants

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Simmons, K.L.; Ramuhali, P.; Brenchley, D.L.

    2012-09-01

    Executive Summary [partial] The purpose of the non-destructive evaluation (NDE) R&D Roadmap for Cables is to support the Materials Aging and Degradation (MAaD) R&D pathway. A workshop was held to gather subject matter experts to develop the NDE R&D Roadmap for Cables. The focus of the workshop was to identify the technical gaps in detecting aging cables and predicting their remaining life expectancy. The workshop was held in Knoxville, Tennessee, on July 30, 2012, at Analysis and Measurement Services Corporation (AMS) headquarters. The workshop was attended by 30 experts in materials, electrical engineering, and NDE instrumentation development from the U.S.more » Nuclear Regulatory Commission (NRC), U.S. Department of Energy (DOE) National Laboratories (Oak Ridge National Laboratory, Pacific Northwest National Laboratory, Argonne National Laboratory, and Idaho National Engineering Laboratory), universities, commercial NDE service vendors and cable manufacturers, and the Electric Power Research Institute (EPRI).« less

  12. The impact of frequency on the performance of microwave ablation.

    PubMed

    Sawicki, James F; Shea, Jacob D; Behdad, Nader; Hagness, Susan C

    2017-02-01

    The use of higher frequencies in percutaneous microwave ablation (MWA) may offer compelling interstitial antenna design advantages over the 915 MHz and 2.45 GHz frequencies typically employed in current systems. To evaluate the impact of higher frequencies on ablation performance, we conducted a comprehensive computational and experimental study of microwave absorption and tissue heating as a function of frequency. We performed electromagnetic and thermal simulations of MWA in ex vivo and in vivo porcine muscle at discrete frequencies in the 1.9-26 GHz range. Ex vivo ablation experiments were performed in the 1.9-18 GHz range. We tracked the size of the ablation zone across frequency for constant input power and ablation duration. Further, we conducted simulations to investigate antenna feed line heating as a function of frequency, input power, and cable diameter. As the frequency was increased from 1.9 to 26 GHz the resulting ablation zone dimensions decreased in the longitudinal direction while remaining relatively constant in the radial direction; thus at higher frequencies the overall ablation zone was more spherical. However, cable heating at higher frequencies became more problematic for smaller diameter cables at constant input power. Comparably sized ablation zones are achievable well above 1.9 GHz, despite increasingly localised power absorption. Specific absorption rate alone does not accurately predict ablation performance, particularly at higher frequencies where thermal diffusion plays an important role. Cable heating due to ohmic losses at higher frequencies may be controlled through judicious choices of input power and cable diameter.

  13. Literature review of environmental qualification of safety-related electric cables: Summary of past work. Volume 1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Subudhi, M.

    1996-04-01

    This report summarizes the findings from a review of published documents dealing with research on the environmental qualification of safety-related electric cables used in nuclear power plants. Simulations of accelerated aging and accident conditions are important considerations in qualifying the cables. Significant research in these two areas has been performed in the US and abroad. The results from studies in France, Germany, and Japan are described in this report. In recent years, the development of methods to monitor the condition of cables has received special attention. Tests involving chemical and physical examination of cable`s insulation and jacket materials, and electricalmore » measurements of the insulation properties of cables are discussed. Although there have been significant advances in many areas, there is no single method which can provide the necessary information about the condition of a cable currently in service. However, it is possible that further research may identify a combination of several methods that can adequately characterize the cable`s condition.« less

  14. 75 FR 5690 - Airworthiness Directives; PIAGGIO AERO INDUSTRIES S.p.A. Model P-180 Airplanes

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-04

    ... operator reported a short circuit between a generator power cable and an anti-ice shutoff valve, which was... the damage. If left uncorrected, this situation could lead to short circuits with possible fire and/or... products. The MCAI states: An operator reported a short circuit between a generator power cable and an anti...

  15. MIC-Large Scale Magnetically Inflated Cable Structures for Space Power, Propulsion, Communications and Observational Applications

    NASA Astrophysics Data System (ADS)

    Powell, James; Maise, George; Rather, John

    2010-01-01

    A new approach for the erection of rigid large scale structures in space-MIC (Magnetically Inflated Cable)-is described. MIC structures are launched as a compact payload of superconducting cables and attached tethers. After reaching orbit, the superconducting cables are energized with electrical current. The magnet force interactions between the cables cause them to expand outwards into the final large structure. Various structural shapes and applications are described. The MIC structure can be a simple flat disc with a superconducting outer ring that supports a tether network holding a solar cell array, or it can form a curved mirror surface that concentrates light and focuses it on a smaller region-for example, a high flux solar array that generates electric power, a high temperature receiver that heats H2 propellant for high Isp propulsion, and a giant primary reflector for a telescope for astronomy and Earth surveillance. Linear dipole and quadrupole MIC structures are also possible. The linear quadrupole structure can be used for magnetic shielding against cosmic radiation for astronauts, for example. MIC could use lightweight YBCO superconducting HTS (High Temperature Superconductor) cables, that can operate with liquid N2 coolant at engineering current densities of ~105 amp/cm2. A 1 kilometer length of MIC cable would weigh only 3 metric tons, including superconductor, thermal insulations, coolant circuits, and refrigerator, and fit within a 3 cubic meter compact package for launch. Four potential MIC applications are described: Solar-thermal propulsion using H2 propellant, space based solar power generation for beaming power to Earth, a large space telescope, and solar electric generation for a manned lunar base. The first 3 applications use large MIC solar concentrating mirrors, while the 4th application uses a surface based array of solar cells on a magnetically levitated MIC structure to follow the sun. MIC space based mirrors can be very large and light in weight. A 300 meter diameter MIC mirror in orbit for example, would weigh 20 metric tons and MIC structures can be easily developed and tested on Earth at small scale in existing evacuated chambers followed by larger scale tests in the atmosphere, using a vacuum tight enclosure on the small diameter superconducting cable to prevent air leakage into the evacuated thermal insulation around the superconducting cable.

  16. 30 CFR 75.1905 - Dispensing of diesel fuel.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Dispensing of diesel fuel. 75.1905 Section 75... HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1905 Dispensing of diesel fuel. (a) Diesel-powered equipment in underground coal mines may be refueled only from safety cans...

  17. 30 CFR 75.1901 - Diesel fuel requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Diesel fuel requirements. 75.1901 Section 75... HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1901 Diesel fuel requirements. (a) Diesel-powered equipment shall be used underground only with a diesel fuel having a sulfur...

  18. 30 CFR 75.1905 - Dispensing of diesel fuel.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Dispensing of diesel fuel. 75.1905 Section 75... HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1905 Dispensing of diesel fuel. (a) Diesel-powered equipment in underground coal mines may be refueled only from safety cans...

  19. 30 CFR 75.1901 - Diesel fuel requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Diesel fuel requirements. 75.1901 Section 75... HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES Diesel-Powered Equipment § 75.1901 Diesel fuel requirements. (a) Diesel-powered equipment shall be used underground only with a diesel fuel having a sulfur...

  20. Method and apparatus for electrical cable testing by pulse-arrested spark discharge

    DOEpatents

    Barnum, John R.; Warne, Larry K.; Jorgenson, Roy E.; Schneider, Larry X.

    2005-02-08

    A method for electrical cable testing by Pulse-Arrested Spark Discharge (PASD) uses the cable response to a short-duration high-voltage incident pulse to determine the location of an electrical breakdown that occurs at a defect site in the cable. The apparatus for cable testing by PASD includes a pulser for generating the short-duration high-voltage incident pulse, at least one diagnostic sensor to detect the incident pulse and the breakdown-induced reflected and/or transmitted pulses propagating from the electrical breakdown at the defect site, and a transient recorder to record the cable response. The method and apparatus are particularly useful to determine the location of defect sites in critical but inaccessible electrical cabling systems in aging aircraft, ships, nuclear power plants, and industrial complexes.

  1. 14 CFR 25.1703 - Function and installation: EWIS.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... arc tracking phenomena. (c) The design and installation of the main power cables (including generator cables) in the fuselage must allow for a reasonable degree of deformation and stretching without failure...

  2. 14 CFR 25.1703 - Function and installation: EWIS.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... arc tracking phenomena. (c) The design and installation of the main power cables (including generator cables) in the fuselage must allow for a reasonable degree of deformation and stretching without failure...

  3. 14 CFR 25.1703 - Function and installation: EWIS.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... arc tracking phenomena. (c) The design and installation of the main power cables (including generator cables) in the fuselage must allow for a reasonable degree of deformation and stretching without failure...

  4. 14 CFR 25.1703 - Function and installation: EWIS.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... arc tracking phenomena. (c) The design and installation of the main power cables (including generator cables) in the fuselage must allow for a reasonable degree of deformation and stretching without failure...

  5. Simultaneous Thermal and Gamma Radiation Aging of Cable Polymers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fifield, Leonard S.; Liu, Shuaishuai; Bowler, Nicola

    Polymers used in nuclear power plant electrical cable systems experience aging and degradation over time due to environmental stress including heat and gamma irradiation. Prediction of long-term cable performance has been based on results of short-term accelerated laboratory aging studies, but questions remain regarding the correlation of accelerated aging to long-term, in-plant aging. This work seeks to increase understanding of the combined effects of heat and radiation on cable polymer material aging toward addressing these questions.

  6. External heating of electrical cables and auto-ignition investigation.

    PubMed

    Courty, L; Garo, J P

    2017-01-05

    Electric cables are now extensively used for both residential and industrial applications. During more than twenty years, multi-scale approaches have been developed to study fire behavior of such cables that represents a serious challenge. Cables are rather complicated materials because they consist of an insulated part and jacket of polymeric materials. These polymeric materials can have various chemical structures, thicknesses and additives and generally have a char-forming tendency when exposed to heat source. In this work, two test methods are used for the characterization of cable pyrolysis and flammability. The first one permits the investigation of cable pyrolysis. A description of the cable mass loss is obtained, coupling an Arrhenius expression with a 1D thermal model of cables heating. Numerical results are successfully compared with experimental data obtained for two types of cable commonly used in French nuclear power plants. The second one is devoted to ignition investigations (spontaneous or piloted) of these cables. All these basic observations, measurements and modelling efforts are of major interest for a more comprehensive fire resistance evaluation of electric cables. Copyright © 2016 Elsevier B.V. All rights reserved.

  7. Custom electronic subsystems for the laboratory telerobotic manipulator

    NASA Technical Reports Server (NTRS)

    Glassell, R. L.; Butler, P. L.; Rowe, J. C.; Zimmermann, S. D.

    1990-01-01

    The National Aeronautics and Space Administration (NASA) Space Station Program presents new opportunities for the application of telerobotic and robotic systems. The Laboratory Telerobotic Manipulator (LTM) is a highly advanced 7 degrees-of-freedom (DOF) telerobotic/robotic manipulator. It was developed and built for the Automation Technology Branch at NASA's Langley Research Center (LaRC) for work in research and to demonstrate ground-based telerobotic manipulator system hardware and software systems for future NASA applications in the hazardous environment of space. The LTM manipulator uses an embedded wiring design with all electronics, motor power, and control and communication cables passing through the pitch-yaw differential joints. This design requires the number of cables passing through the pitch/yaw joint to be kept to a minimum. To eliminate the cables needed to carry each pitch-yaw joint's sensor data to the VME control computers, a custom-embedded electronics package for each manipulator joint was developed. The electronics package collects and sends the joint's sensor data to the VME control computers over a fiber optic cable. The electronics package consist of five individual subsystems: the VME Link Processor, the Joint Processor and the Joint Processor power supply in the joint module, the fiber optics communications system, and the electronics and motor power cabling.

  8. Evolution of low-profile and lightweight electrical connectors for soldier-worn applications

    NASA Astrophysics Data System (ADS)

    Gans, Eric; Lee, Kang; Jannson, Tomasz; Walter, Kevin

    2011-06-01

    In addition to military radios, modern warfighters carry cell phones, GPS devices, computers, and night-vision aids, all of which require electrical cables and connectors for data and power transmission. Currently each electrical device operates via independent cables using conventional cable and connector technology. Conventional cables are stiff and difficult to integrate into a soldier-worn garment. Conventional connectors are tall and heavy, as they were designed to ensure secure connections to bulkhead-type panels, and being tall, represent significant snag-hazards in soldier-worn applications. Physical Optics Corporation has designed a new, lightweight and low-profile electrical connector that is more suitable for body-worn applications and operates much like a standard garment snap. When these connectors are mated, the combined height is <0.3 in. - a significant reduction from the 2.5 in. average height of conventional connectors. Electrical connections can be made with one hand (gloved or bare) and blindly (without looking). Furthermore, POC's connectors are integrated into systems that distribute data or power from a central location on the soldier's vest, reducing the length and weight of the cables necessary to interconnect various mission-critical electronic systems. The result is a lightweight power/data distribution system offering significant advantages over conventional electrical connectors in soldier-worn applications.

  9. 75 FR 47588 - Trans Bay Cable, LLC; Notice of Institution of Section 206 Investigation and Refund Effective Date

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-06

    ... Cable, LLC; Notice of Institution of Section 206 Investigation and Refund Effective Date July 30, 2010...-116-000, pursuant to section 206 of the Federal Power Act (FPA), 16 U.S.C. 824e, concerning the justness and reasonableness of rates proposed by Trans Bay Cable, LLC (Trans Bay) in [[Page 47589

  10. 47 CFR 76.610 - Operation in the frequency bands 108-137 and 225-400 MHz-scope of application.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Technical... applicable to all MVPDs (cable and non-cable) transmitting carriers or other signal components carried at an average power level equal to or greater than 10−4 watts across a 25 kHz bandwidth in any 160 microsecond...

  11. 47 CFR 76.610 - Operation in the frequency bands 108-137 and 225-400 MHz-scope of application.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Technical... applicable to all MVPDs (cable and non-cable) transmitting carriers or other signal components carried at an average power level equal to or greater than 10−4 watts across a 25 kHz bandwidth in any 160 microsecond...

  12. 47 CFR 76.610 - Operation in the frequency bands 108-137 and 225-400 MHz-scope of application.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Technical... applicable to all MVPDs (cable and non-cable) transmitting carriers or other signal components carried at an average power level equal to or greater than 10−4 watts across a 25 kHz bandwidth in any 160 microsecond...

  13. 47 CFR 76.610 - Operation in the frequency bands 108-137 and 225-400 MHz-scope of application.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Technical... applicable to all MVPDs (cable and non-cable) transmitting carriers or other signal components carried at an average power level equal to or greater than 10−4 watts across a 25 kHz bandwidth in any 160 microsecond...

  14. Space Station Freedom secondary power wiring requirements

    NASA Technical Reports Server (NTRS)

    Sawyer, C. R.

    1994-01-01

    Secondary power is produced by DDCU's (direct current to direct current converter units) and routed to and through secondary power distribution assemblies (SPDA's) to loads or tertiary distribution assemblies. This presentation outlines requirements of Space Station Freedom (SSF) EEE (electrical, electronic, and electromechanical) parts wire and the approved electrical wire and cable. The SSF PDRD (Program Definition and Requirements Document) language problems and resolution are reviewed. The cable routing to and from the SPDA's is presented as diagrams and the wire recommendations and characteristics are given.

  15. A comparison between the ANSI/IEEE and the CENELEC/IEC approach to overload protection of insulated power cables

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parise, G.; Rubino, G.

    1995-12-31

    The same basic principles, on which the methods of power cables protection against overloads are based, are summed up by different criteria and formulations within ANSI/IEEE and CENELEC/IEC publications. The studies carried out by the technical committees of these organizations have been examined and compared in order to point out not only their differences but also their complementary aspects. By arranging the two approaches, it has been possible to outline a third way to determine the admissible duration of overload currents and define intermediate criteria for the emergency ratings of cables and for the coordination of protective devices.

  16. National Program of Inspection of Non-Federal Dams, Tennessee. 8th Avenue Reservoir (Inventory Number TN 03719), Cumberland River Basin, Nashville, Davidson County, Tennessee. Phase I Investigation Report,

    DTIC Science & Technology

    1981-09-01

    the rock, the other end attached to a linear potentiometer sensor . All sensors would be connected by underground cable to a central control terminal...soil and rock mass comprising the subfoundation. We have also placed four tiltmeters on the top of the reservoir wall at Its Intersection with the axes...quarter points. These, too, must nut be disturbed. The holes prepared for instrumentation are being regularly "read" with a Digitilt Sensor blaxial

  17. The Increase of Power Efficiency of Underground Coal Mining by the Forecasting of Electric Power Consumption

    NASA Astrophysics Data System (ADS)

    Efremenko, Vladimir; Belyaevsky, Roman; Skrebneva, Evgeniya

    2017-11-01

    In article the analysis of electric power consumption and problems of power saving on coal mines are considered. Nowadays the share of conditionally constant costs of electric power for providing safe working conditions underground on coal mines is big. Therefore, the power efficiency of underground coal mining depends on electric power expense of the main technological processes and size of conditionally constant costs. The important direction of increase of power efficiency of coal mining is forecasting of a power consumption and monitoring of electric power expense. One of the main approaches to reducing of electric power costs is increase in accuracy of the enterprise demand in the wholesale electric power market. It is offered to use artificial neural networks to forecasting of day-ahead power consumption with hourly breakdown. At the same time use of neural and indistinct (hybrid) systems on the principles of fuzzy logic, neural networks and genetic algorithms is more preferable. This model allows to do exact short-term forecasts at a small array of input data. A set of the input parameters characterizing mining-and-geological and technological features of the enterprise is offered.

  18. Integration of HTS Cables in the Future Grid of the Netherlands

    NASA Astrophysics Data System (ADS)

    Zuijderduin, R.; Chevtchenko, O.; Smit, J. J.; Aanhaanen, G.; Melnik, I.; Geschiere, A.

    Due to increasing power demand, the electricity grid of the Netherlands is changing. The future transmission grid will obtain electrical power generated by decentralized renewable sources, together with large scale generation units located at the coastal region. In this way electrical power has to be distributed and transmitted over longer distances from generation to end user. Potential grid issues like: amount of distributed power, grid stability and electrical loss dissipation merit particular attention. High temperature superconductors (HTS) can play an important role in solving these grid problems. Advantages to integrate HTS components at transmission voltages are numerous: more transmittable power together with less emissions, intrinsic fault current limiting capability, lower ac loss, better control of power flow, reduced footprint, less magnetic field emissions, etc. The main obstacle at present is the relatively high price of HTS conductor. However as the price goes down, initial market penetration of several HTS components (e.g.: cables, fault current limiters) is expected by year 2015. In the full paper we present selected ways to integrate EHV AC HTS cables depending on a particular future grid scenario in the Netherlands.

  19. 30 CFR Appendix I to Subpart D of... - Appendix I to Subpart D of Part 18

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... diameter of three-conductor portable power cables with tolerances in inches—601 to 5,000 volts. 8 Fuse... diameters. Table 1—Portable Power Cable Ampacities—600 Volts (Amperes Per Conductor Based on 60 °C. Copper Temperature—40 °C. Ambient) Conductor size—AWG or MCM Single conductor 2-conductor, round or flat 3-conductor...

  20. 30 CFR Appendix I to Subpart D of... - Appendix I to Subpart D of Part 18

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... diameter of three-conductor portable power cables with tolerances in inches—601 to 5,000 volts. 8 Fuse... diameters. Table 1—Portable Power Cable Ampacities—600 Volts (Amperes Per Conductor Based on 60 °C. Copper Temperature—40 °C. Ambient) Conductor size—AWG or MCM Single conductor 2-conductor, round or flat 3-conductor...

Top