Cryogenic Control System Migration and Developments towards the UNICOS CERN Standard at INFN
NASA Astrophysics Data System (ADS)
Modanese, Paolo; Calore, Andrea; Contran, Tiziano; Friso, Alessandro; Pengo, Marco; Canella, Stefania; Burioli, Sergio; Gallese, Benedetto; Inglese, Vitaliano; Pezzetti, Marco; Pengo, Ruggero
The cryogenic control systems at Laboratori Nazionali di Legnaro (LNL) are undergoing an important and radical modernization, allowing all the plants controls and supervision systems to be renewed in a homogeneous way towards the CERN-UNICOS standard. Before the UNICOS migration project started there were as many as 7 different types of PLC and 7 different types of SCADA, each one requiring its own particular programming language. In these conditions, even a simple modification and/or integration on the program or on the supervision, required the intervention of a system integrator company, specialized in its specific control system. Furthermore it implied that the operators have to be trained to learn the different types of control systems. The CERN-UNICOS invented for LHC [1] has been chosen due to its reliability and planned to run and be maintained for decades on. The complete migration is part of an agreement between CERN and INFN.
A progress report on UNICOS misuse detection at Los Alamos
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thompson, J.L.; Jackson, K.A.; Stallings, C.A.
An effective method for detecting computer misuse is the automatic monitoring and analysis of on-line user activity. During the past year, Los Alamos enhanced its Network Anomaly Detection and Intrusion Reporter (NADIR) to include analysis of user activity on Los Alamos` UNICOS Crays. In near real-time, NADIR compares user activity to historical profiles and tests activity against expert rules. The expert rules express Los Alamos` security policy and define improper or suspicious behavior. NADIR reports suspicious behavior to security auditors and provides tools to aid in follow-up investigations. This paper describes the implementation to date of the UNICOS component ofmore » NADIR, along with the operational experiences and future plans for the system.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jackson, K.A.; Neuman, M.C.; Simmonds, D.D.
An effective method for detecting computer misuse is the automatic monitoring and analysis of on-line user activity. This activity is reflected in the system audit record, in the system vulnerability posture, and in other evidence found through active testing of the system. During the last several years we have implemented an automatic misuse detection system at Los Alamos. This is the Network Anomaly Detection and Intrusion Reporter (NADIR). We are currently expanding NADIR to include processing of the Cray UNICOS operating system. This new component is called the UNICOS Realtime NADIR, or UNICORN. UNICORN summarizes user activity and system configurationmore » in statistical profiles. It compares these profiles to expert rules that define security policy and improper or suspicious behavior. It reports suspicious behavior to security auditors and provides tools to aid in follow-up investigations. The first phase of UNICORN development is nearing completion, and will be operational in late 1994.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Christoph, G.G; Jackson, K.A.; Neuman, M.C.
An effective method for detecting computer misuse is the automatic auditing and analysis of on-line user activity. This activity is reflected in the system audit record, by changes in the vulnerability posture of the system configuration, and in other evidence found through active testing of the system. In 1989 we started developing an automatic misuse detection system for the Integrated Computing Network (ICN) at Los Alamos National Laboratory. Since 1990 this system has been operational, monitoring a variety of network systems and services. We call it the Network Anomaly Detection and Intrusion Reporter, or NADIR. During the last year andmore » a half, we expanded NADIR to include processing of audit and activity records for the Cray UNICOS operating system. This new component is called the UNICOS Real-time NADIR, or UNICORN. UNICORN summarizes user activity and system configuration information in statistical profiles. In near real-time, it can compare current activity to historical profiles and test activity against expert rules that express our security policy and define improper or suspicious behavior. It reports suspicious behavior to security auditors and provides tools to aid in follow-up investigations. UNICORN is currently operational on four Crays in Los Alamos` main computing network, the ICN.« less
Attaching IBM-compatible 3380 disks to Cray X-MP
DOE Office of Scientific and Technical Information (OSTI.GOV)
Engert, D.E.; Midlock, J.L.
1989-01-01
A method of attaching IBM-compatible 3380 disks directly to a Cray X-MP via the XIOP with a BMC is described. The IBM 3380 disks appear to the UNICOS operating system as DD-29 disks with UNICOS file systems. IBM 3380 disks provide cheap, reliable large capacity disk storage. Combined with a small number of high-speed Cray disks, the IBM disks provide for the bulk of the storage for small files and infrequently used files. Cray Research designed the BMC and its supporting software in the XIOP to allow IBM tapes and other devices to be attached to the X-MP. No hardwaremore » changes were necessary, and we added less than 2000 lines of code to the XIOP to accomplish this project. This system has been in operation for over eight months. Future enhancements such as the use of a cache controller and attachment to a Y-MP are also described. 1 tab.« less
Performance Analysis of the NAS Y-MP Workload
NASA Technical Reports Server (NTRS)
Bergeron, Robert J.; Kutler, Paul (Technical Monitor)
1997-01-01
This paper describes the performance characteristics of the computational workloads on the NAS Cray Y-MP machines, a Y-MP 832 and later a Y-MP 8128. Hardware measurements indicated that the Y-MP workload performance matured over time, ultimately sustaining an average throughput of 0.8 GFLOPS and a vector operation fraction of 87%. The measurements also revealed an operation rate exceeding 1 per clock period, a well-balanced architecture featuring a strong utilization of vector functional units, and an efficient memory organization. Introduction of the larger memory 8128 increased throughput by allowing a more efficient utilization of CPUs. Throughput also depended on the metering of the batch queues; low-idle Saturday workloads required a buffer of small jobs to prevent memory starvation of the CPU. UNICOS required about 7% of total CPU time to service the 832 workloads; this overhead decreased to 5% for the 8128 workloads. While most of the system time went to service I/O requests, efficient scheduling prevented excessive idle due to I/O wait. System measurements disclosed no obvious bottlenecks in the response of the machine and UNICOS to the workloads. In most cases, Cray-provided software tools were- quite sufficient for measuring the performance of both the machine and operating, system.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Robertson, D.W.; Johnston, W.E.; Hall, D.E.
1990-03-01
We describe the use of the Sun Remote Procedure Call and Unix socket interprocess communication mechanisms to provide the network transport for a distributed, client-server based, image handling system. Clients run under Unix or UNICOS and servers run under Unix or MS-DOS. The use of remote procedure calls across local or wide-area networks to make video movies is addressed.
Implementing TCP/IP and a socket interface as a server in a message-passing operating system
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hipp, E.; Wiltzius, D.
1990-03-01
The UNICOS 4.3BSD network code and socket transport interface are the basis of an explicit network server for NLTSS, a message passing operating system on the Cray YMP. A BSD socket user library provides access to the network server using an RPC mechanism. The advantages of this server methodology are its modularity and extensibility to migrate to future protocol suites (e.g. OSI) and transport interfaces. In addition, the network server is implemented in an explicit multi-tasking environment to take advantage of the Cray YMP multi-processor platform. 19 refs., 5 figs.
A secure file manager for UNIX
DOE Office of Scientific and Technical Information (OSTI.GOV)
DeVries, R.G.
1990-12-31
The development of a secure file management system for a UNIX-based computer facility with supercomputers and workstations is described. Specifically, UNIX in its usual form does not address: (1) Operation which would satisfy rigorous security requirements. (2) Online space management in an environment where total data demands would be many times the actual online capacity. (3) Making the file management system part of a computer network in which users of any computer in the local network could retrieve data generated on any other computer in the network. The characteristics of UNIX can be exploited to develop a portable, secure filemore » manager which would operate on computer systems ranging from workstations to supercomputers. Implementation considerations making unusual use of UNIX features, rather than requiring extensive internal system changes, are described, and implementation using the Cray Research Inc. UNICOS operating system is outlined.« less
SIB health psychology in Brazil: The challenges for working in public health settings.
Spink, Mary-Jane P; Brigagão, Jacqueline M; Menegon, Vera M; Vicentin, Maria-Cristina G
2016-03-01
Considering the diversity of theoretical approaches and settings for psychological practice, this editorial provides a background for the articles that have been included in this special issue concerning health psychology in the context of the Brazilian Unified Health System (Sistema Unico de Saude). We addressed issues concerning the national curricular outline for undergraduate training in psychology and historical data on the social movements that led to the creation of the Sistema Unico de Saude and the Psychiatric Reform which created an important area for psychological work absorbing a considerable number of psychologists. © The Author(s) 2016.
Multitasking the three-dimensional transport code TORT on CRAY platforms
DOE Office of Scientific and Technical Information (OSTI.GOV)
Azmy, Y.Y.; Barnett, D.A.; Burre, C.A.
1996-04-01
The multitasking options in the three-dimensional neutral particle transport code TORT originally implemented for Cray`s CTSS operating system are revived and extended to run on Cray Y/MP and C90 computers using the UNICOS operating system. These include two coarse-grained domain decompositions; across octants, and across directions within an octant, termed Octant Parallel (OP), and Direction Parallel (DP), respectively. Parallel performance of the DP is significantly enhanced by increasing the task grain size and reducing load imbalance via dynamic scheduling of the discrete angles among the participating tasks. Substantial Wall Clock speedup factors, approaching 4.5 using 8 tasks, have been measuredmore » in a time-sharing environment, and generally depend on the test problem specifications, number of tasks, and machine loading during execution.« less
USDA-ARS?s Scientific Manuscript database
En este articulo se reporta por primera vez para el Peru una especies del genero Nielsonia Young, 1977, de material procedente del Departamento de Tumbes. El genero ha sido reportada anteriormente de Ecuador, como unico registro para Sudamerica, y America Central. El unico especimen hembra encontra...
Using the K-25 C TD Common File System: A guide to CFSI (CFS Interface)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-12-01
A CFS (Common File System) is a large, centralized file management and storage facility based on software developed at Los Alamos National Laboratory. This manual is a guide to use of the CFS available to users of the Cray UNICOS system at Martin Marietta Energy Systems, Inc., in Oak Ridge, Tennessee.
Mechanisms of microregulation of private hospitals by health plan operators.
Ugá, Maria Alicia Domínguez; Vasconcellos, Miguel Murat; Lima, Sheyla Maria Lemos; Portela, Margareth Crisóstomo; Gerschman, Silvia
2009-10-01
To analyze the mechanisms employed by health plan operators for microregulation of clinical management and health care qualification within care-providing hospitals. A nation-wide cross-sectional study was carried out. The universe consisted of hospitals which provided care to health plan operators in 2006. A sample of 83 units was selected, stratified by Brazilian macroregion and type of hospital. Data were obtained by means of a questionnaire administered to hospital managers. Microregulation of hospitals by health plan operators was minimal or almost absent in terms of health care qualification. Operator activity focused predominantly on intense control of the amount of services used by patients. Hospitals providing services to health plan operators did not constitute health micro-systems parallel or supplementary to the Sistema Unico de Saúde (SUS - Brazilian National Health System). The private care-providing hospitals were predominantly associated with SUS. However, these did not belong to a private care-provider network, even though their service usage was subject to strong regulation by health plan operators. Operator intervention in the form of system management was incipient or virtually absent. Roughly one-half of investigated hospitals reported adopting clinical directives, whereas only 25.4% reported managing pathology and 30.5% reported managing cases. Contractual relationships between hospitals and health plan operators are merely commercial contracts with little if any incorporation of aspects related to the quality of care, being generally limited to aspects such as establishment of prices, timeframes, and payment procedures.
Multitasking TORT under UNICOS: Parallel performance models and measurements
DOE Office of Scientific and Technical Information (OSTI.GOV)
Barnett, A.; Azmy, Y.Y.
1999-09-27
The existing parallel algorithms in the TORT discrete ordinates code were updated to function in a UNICOS environment. A performance model for the parallel overhead was derived for the existing algorithms. The largest contributors to the parallel overhead were identified and a new algorithm was developed. A parallel overhead model was also derived for the new algorithm. The results of the comparison of parallel performance models were compared to applications of the code to two TORT standard test problems and a large production problem. The parallel performance models agree well with the measured parallel overhead.
Multitasking TORT Under UNICOS: Parallel Performance Models and Measurements
DOE Office of Scientific and Technical Information (OSTI.GOV)
Azmy, Y.Y.; Barnett, D.A.
1999-09-27
The existing parallel algorithms in the TORT discrete ordinates were updated to function in a UNI-COS environment. A performance model for the parallel overhead was derived for the existing algorithms. The largest contributors to the parallel overhead were identified and a new algorithm was developed. A parallel overhead model was also derived for the new algorithm. The results of the comparison of parallel performance models were compared to applications of the code to two TORT standard test problems and a large production problem. The parallel performance models agree well with the measured parallel overhead.
UNICOS Kernel Internals Application Development
NASA Technical Reports Server (NTRS)
Caredo, Nicholas; Craw, James M. (Technical Monitor)
1995-01-01
Having an understanding of UNICOS Kernel Internals is valuable information. However, having the knowledge is only half the value. The second half comes with knowing how to use this information and apply it to the development of tools. The kernel contains vast amounts of useful information that can be utilized. This paper discusses the intricacies of developing utilities that utilize kernel information. In addition, algorithms, logic, and code will be discussed for accessing kernel information. Code segments will be provided that demonstrate how to locate and read kernel structures. Types of applications that can utilize kernel information will also be discussed.
Commissioning results of CERN HIE-ISOLDE and INFN ALPI cryogenic control systems
NASA Astrophysics Data System (ADS)
Inglese, V.; Pezzetti, M.; Calore, A.; Modanese, P.; Pengo, R.
2017-02-01
The cryogenic systems of both accelerators, namely HIE ISOLDE (High Intensity and Energy Isotope Separator On Line DEvice) at CERN and ALPI (Acceleratore Lineare Per Ioni) at LNL, have been refurbished. HIE ISOLDE is a major upgrade of the existing ISOLDE facilities, which required the construction of a superconducting linear accelerator consisting of six cryomodules, each containing five superconductive RF cavities and superconducting solenoids. The ALPI linear accelerator, similar to HIE ISOLDE, is located at Legnaro National Laboratories (LNL) and became operational in the early 90’s. It is composed of 74 superconducting RF cavities, assembled inside 22 cryostats. The new control systems are equipped with PLC, developed on the CERN UNICOS framework, which include Schneider and Siemens PLCs and various fieldbuses (Profibus DP and PA, WorldFIP). The control systems were developed in synergy between CERN and LNL in order to build, effectively and with an optimized use of resources, control systems allowing to enhance ease of operation, maintainability, and long-term availability. This paper describes (i) the cryogenic systems, with special focus on the design of the control systems hardware and software, (ii) the strategy adopted in order to achieve a synergic approach, and (iii) the commissioning results after the cool-down to 4.5 K of the cryomodules.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Haynes, R.A.
The Network File System (NFS) is used in UNIX-based networks to provide transparent file sharing between heterogeneous systems. Although NFS is well-known for being weak in security, it is widely used and has become a de facto standard. This paper examines the user authentication shortcomings of NFS and the approach Sandia National Laboratories has taken to strengthen it with Kerberos. The implementation on a Cray Y-MP8/864 running UNICOS is described and resource/performance issues are discussed. 4 refs., 4 figs.
The Performance of the NAS HSPs in 1st Half of 1994
NASA Technical Reports Server (NTRS)
Bergeron, Robert J.; Walter, Howard (Technical Monitor)
1995-01-01
During the first six months of 1994, the NAS (National Airspace System) 16-CPU Y-MP C90 Von Neumann (VN) delivered an average throughput of 4.045 GFLOPS while the ACSF (Aeronautics Consolidated Supercomputer Facility) 8-CPU Y-MP C90 Eagle averaged 1.658 GFLOPS. The VN rate represents a machine efficiency of 26.3% whereas the Eagle rate corresponds to a machine efficiency of 21.6%. VN displayed a greater efficiency than Eagle primarily because the stronger workload demand for its CPU cycles allowed it to devote more time to user programs and less time to idle. An additional factor increasing VN efficiency was the ability of the UNICOS 8.0 Operating System to deliver a larger fraction of CPU time to user programs. Although measurements indicate increasing vector length for both workloads, insufficient vector lengths continue to hinder HSP (High Speed Processor) performance. To improve HSP performance, NAS should continue to encourage the HSP users to modify their codes to increase program vector length.
[Analysis of economic viability of a mobile eye clinic of a referral Ophthalmology Service].
Lima, Luiz Henrique Soares Gonçalves de; Sousa, Luciene Barbosa de
2005-01-01
To analyse the economic viability of a mobile eye clinic of a tertiary referral Ophthalmology Service. The amount of money spent with the purchase and construction of the unit in 2000, and the expenses with its maintenance and operation in 2001 were considered, comparing these expenses with the income obtained from appointments, supplementary tests and eye surgeries through the "Sistema Unico de Saúde" (a health care service provided by the government), in 2001. In order to make an economic analysis, an interest rate of 10% per year and a period of depreciation of 10 years were stipulated. The total amount spent to buy and set up a mobile unit of "Hospital Oftamológico de Sorocaba" was R$ 184,140,00. The amount spent with its maintenance and operation during 2001 was R$ 28,000.00. The unit was used on average during 2 days each week in 2001 and 6492 appointments were made in this period, generating an income of R$ 32,460.00. The appointments generated complementary tests and eye surgeries making up R$ 51,540.00. Therefore, the total amount received directly with the appointments, complementary tests and eye surgeries during 2001 was R$ 84,000.00 paid by the "Sistema Unico de Saúde", according to values established beforehand. Using these values it is possible to make an economic analysis of this enterprise and this was done with and without money savings for depreciation, taking into account the income and the expenses. Besides attending poor communities that are located in distant neighborhoods, a mobile eye clinic can be a source of income for ophthalmologic services.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hughes, T.P.; Clark, R.M.; Mostrom, M.A.
This report discusses the following topics on the LAMDA program: General maintenance; CTSS FCL script; DOS batch files; Macintosh MPW scripts; UNICOS FCL script; VAX/MS command file; LINC calling tree; and LAMDA calling tree.
LAMDA programmer`s manual. [Final report, Part 1
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hughes, T.P.; Clark, R.M.; Mostrom, M.A.
This report discusses the following topics on the LAMDA program: General maintenance; CTSS FCL script; DOS batch files; Macintosh MPW scripts; UNICOS FCL script; VAX/MS command file; LINC calling tree; and LAMDA calling tree.
ARC2D - EFFICIENT SOLUTION METHODS FOR THE NAVIER-STOKES EQUATIONS (DEC RISC ULTRIX VERSION)
NASA Technical Reports Server (NTRS)
Biyabani, S. R.
1994-01-01
ARC2D is a computational fluid dynamics program developed at the NASA Ames Research Center specifically for airfoil computations. The program uses implicit finite-difference techniques to solve two-dimensional Euler equations and thin layer Navier-Stokes equations. It is based on the Beam and Warming implicit approximate factorization algorithm in generalized coordinates. The methods are either time accurate or accelerated non-time accurate steady state schemes. The evolution of the solution through time is physically realistic; good solution accuracy is dependent on mesh spacing and boundary conditions. The mathematical development of ARC2D begins with the strong conservation law form of the two-dimensional Navier-Stokes equations in Cartesian coordinates, which admits shock capturing. The Navier-Stokes equations can be transformed from Cartesian coordinates to generalized curvilinear coordinates in a manner that permits one computational code to serve a wide variety of physical geometries and grid systems. ARC2D includes an algebraic mixing length model to approximate the effect of turbulence. In cases of high Reynolds number viscous flows, thin layer approximation can be applied. ARC2D allows for a variety of solutions to stability boundaries, such as those encountered in flows with shocks. The user has considerable flexibility in assigning geometry and developing grid patterns, as well as in assigning boundary conditions. However, the ARC2D model is most appropriate for attached and mildly separated boundary layers; no attempt is made to model wake regions and widely separated flows. The techniques have been successfully used for a variety of inviscid and viscous flowfield calculations. The Cray version of ARC2D is written in FORTRAN 77 for use on Cray series computers and requires approximately 5Mb memory. The program is fully vectorized. The tape includes variations for the COS and UNICOS operating systems. Also included is a sample routine for CONVEX computers to emulate Cray system time calls, which should be easy to modify for other machines as well. The standard distribution media for this version is a 9-track 1600 BPI ASCII Card Image format magnetic tape. The Cray version was developed in 1987. The IBM ES/3090 version is an IBM port of the Cray version. It is written in IBM VS FORTRAN and has the capability of executing in both vector and parallel modes on the MVS/XA operating system and in vector mode on the VM/XA operating system. Various options of the IBM VS FORTRAN compiler provide new features for the ES/3090 version, including 64-bit arithmetic and up to 2 GB of virtual addressability. The IBM ES/3090 version is available only as a 9-track, 1600 BPI IBM IEBCOPY format magnetic tape. The IBM ES/3090 version was developed in 1989. The DEC RISC ULTRIX version is a DEC port of the Cray version. It is written in FORTRAN 77 for RISC-based Digital Equipment platforms. The memory requirement is approximately 7Mb of main memory. It is available in UNIX tar format on TK50 tape cartridge. The port to DEC RISC ULTRIX was done in 1990. COS and UNICOS are trademarks and Cray is a registered trademark of Cray Research, Inc. IBM, ES/3090, VS FORTRAN, MVS/XA, and VM/XA are registered trademarks of International Business Machines. DEC and ULTRIX are registered trademarks of Digital Equipment Corporation.
ARC2D - EFFICIENT SOLUTION METHODS FOR THE NAVIER-STOKES EQUATIONS (CRAY VERSION)
NASA Technical Reports Server (NTRS)
Pulliam, T. H.
1994-01-01
ARC2D is a computational fluid dynamics program developed at the NASA Ames Research Center specifically for airfoil computations. The program uses implicit finite-difference techniques to solve two-dimensional Euler equations and thin layer Navier-Stokes equations. It is based on the Beam and Warming implicit approximate factorization algorithm in generalized coordinates. The methods are either time accurate or accelerated non-time accurate steady state schemes. The evolution of the solution through time is physically realistic; good solution accuracy is dependent on mesh spacing and boundary conditions. The mathematical development of ARC2D begins with the strong conservation law form of the two-dimensional Navier-Stokes equations in Cartesian coordinates, which admits shock capturing. The Navier-Stokes equations can be transformed from Cartesian coordinates to generalized curvilinear coordinates in a manner that permits one computational code to serve a wide variety of physical geometries and grid systems. ARC2D includes an algebraic mixing length model to approximate the effect of turbulence. In cases of high Reynolds number viscous flows, thin layer approximation can be applied. ARC2D allows for a variety of solutions to stability boundaries, such as those encountered in flows with shocks. The user has considerable flexibility in assigning geometry and developing grid patterns, as well as in assigning boundary conditions. However, the ARC2D model is most appropriate for attached and mildly separated boundary layers; no attempt is made to model wake regions and widely separated flows. The techniques have been successfully used for a variety of inviscid and viscous flowfield calculations. The Cray version of ARC2D is written in FORTRAN 77 for use on Cray series computers and requires approximately 5Mb memory. The program is fully vectorized. The tape includes variations for the COS and UNICOS operating systems. Also included is a sample routine for CONVEX computers to emulate Cray system time calls, which should be easy to modify for other machines as well. The standard distribution media for this version is a 9-track 1600 BPI ASCII Card Image format magnetic tape. The Cray version was developed in 1987. The IBM ES/3090 version is an IBM port of the Cray version. It is written in IBM VS FORTRAN and has the capability of executing in both vector and parallel modes on the MVS/XA operating system and in vector mode on the VM/XA operating system. Various options of the IBM VS FORTRAN compiler provide new features for the ES/3090 version, including 64-bit arithmetic and up to 2 GB of virtual addressability. The IBM ES/3090 version is available only as a 9-track, 1600 BPI IBM IEBCOPY format magnetic tape. The IBM ES/3090 version was developed in 1989. The DEC RISC ULTRIX version is a DEC port of the Cray version. It is written in FORTRAN 77 for RISC-based Digital Equipment platforms. The memory requirement is approximately 7Mb of main memory. It is available in UNIX tar format on TK50 tape cartridge. The port to DEC RISC ULTRIX was done in 1990. COS and UNICOS are trademarks and Cray is a registered trademark of Cray Research, Inc. IBM, ES/3090, VS FORTRAN, MVS/XA, and VM/XA are registered trademarks of International Business Machines. DEC and ULTRIX are registered trademarks of Digital Equipment Corporation.
76 FR 59128 - Ocean Transportation Intermediary License; Revocation
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-23
...: Unico Logistics Inc. Address: 147-04 183rd Street, Suite 203, Jamaica, NY 11413. Date Revoked: August 1... Express Inc. Address: 2130 SW. 58th Way, West Park, FL 33023. Date Revoked: August 25, 2011. Reason.... Name: Titan International Logistics, LLC. Address: 16905 Cherie Place, Carson, CA 90746. Date Revoked...
U.S. EPA, Pesticide Product Label, UNICO FRUIT SPRAY POWDER, 08/12/1969
2011-04-14
... hlad, I'ot, dll\\\\ 11.\\ Illlld,'\\\\ Applv .1, \\\\ hl'll tHHl ... or ... hoot ..... t\\o\\\\ 1111 tl ~, t I!, I I , , , I \\\\ht·n ··hoot .... .lIT 10 ttl l:! 1l1l·ht, .... lllng, ;{ ItI,l" \\\\"f'l'\\ .I~·': ...
New tools using the hardware performance monitor to help users tune programs on the Cray X-MP
DOE Office of Scientific and Technical Information (OSTI.GOV)
Engert, D.E.; Rudsinski, L.; Doak, J.
1991-09-25
The performance of a Cray system is highly dependent on the tuning techniques used by individuals on their codes. Many of our users were not taking advantage of the tuning tools that allow them to monitor their own programs by using the Hardware Performance Monitor (HPM). We therefore modified UNICOS to collect HPM data for all processes and to report Mflop ratings based on users, programs, and time used. Our tuning efforts are now being focused on the users and programs that have the best potential for performance improvements. These modifications and some of the more striking performance improvements aremore » described.« less
Andrade, Raquel Dully; de Mello, Débora Falleiros
2006-03-01
The aim of this research is to present perspectives on partnerships between social organizations and governmental institutions in children's health care. This study reflects on social participation and relations between governmental and non-governmental services in constructing the consolidation of the Sistema Unico de Saúde (Unified Health System), highlighting the role of volunteers and health professionals in this process. In child care, these associations are potential, due to the wide range and prominence of social organizations oriented towards children, particularly the Pastoral da Criança (the Catholic Church's Child Pastoral), which makes it important to discuss public policies aimed at establishing and strengthening these links in the local and national spheres.
Residential Cold Climate Heat Pump (CCHP) w/Variable Speed Technology
DOE Office of Scientific and Technical Information (OSTI.GOV)
Messmer, Craig S.
2016-09-30
This report summarizes the results of a three year program awarded to Unico, Inc. to commercialize a residential cold climate heat pump. Several designs were investigated. Compressors were selected using analysis from Oakridge National Laboratories followed by prototype construction and lab testing in a specially built environmental chamber capable of reaching -30°F. The initial design utilized two variable speed compressors in series with very good capacity results and acceptable efficiency at very cold temperatures. The design was then modified to reduce cost and complexity by redesigning the system using three dual-stage compressors: two in parallel followed by one in series.more » Extensive testing found significant challenge with oil management, reliability, weight and cost which prevented the system from being fully commercialized. Further analysis of other conceptual designs indicated that these challenges could be overcome in the future.« less
Securing the User's Work Environment
NASA Technical Reports Server (NTRS)
Cardo, Nicholas P.
2004-01-01
High performance computing at the Numerical Aerospace Simulation Facility at NASA Ames Research Center includes C90's, J90's and Origin 2000's. Not only is it necessary to protect these systems from outside attacks, but also to provide a safe working environment on the systems. With the right tools, security anomalies in the user s work environment can be deleted and corrected. Validating proper ownership of files against user s permissions, will reduce the risk of inadvertent data compromise. The detection of extraneous directories and files hidden amongst user home directories is important for identifying potential compromises. The first runs of these utilities detected over 350,000 files with problems. With periodic scans, automated correction of problems takes only minutes. Tools for detecting these types of problems as well as their development techniques will be discussed with emphasis on consistency, portability and efficiency for both UNICOS and IRIX.
Transient dynamics capability at Sandia National Laboratories
NASA Technical Reports Server (NTRS)
Attaway, Steven W.; Biffle, Johnny H.; Sjaardema, G. D.; Heinstein, M. W.; Schoof, L. A.
1993-01-01
A brief overview of the transient dynamics capabilities at Sandia National Laboratories, with an emphasis on recent new developments and current research is presented. In addition, the Sandia National Laboratories (SNL) Engineering Analysis Code Access System (SEACAS), which is a collection of structural and thermal codes and utilities used by analysts at SNL, is described. The SEACAS system includes pre- and post-processing codes, analysis codes, database translation codes, support libraries, Unix shell scripts for execution, and an installation system. SEACAS is used at SNL on a daily basis as a production, research, and development system for the engineering analysts and code developers. Over the past year, approximately 190 days of CPU time were used by SEACAS codes on jobs running from a few seconds up to two and one-half days of CPU time. SEACAS is running on several different systems at SNL including Cray Unicos, Hewlett Packard PH-UX, Digital Equipment Ultrix, and Sun SunOS. An overview of SEACAS, including a short description of the codes in the system, are presented. Abstracts and references for the codes are listed at the end of the report.
Performance analysis: a study using data envelopment analysis in 26 Brazilian hospitals.
Guerra, Mariana; de Souza, Antônio Artur; Moreira, Douglas Rafael
2012-01-01
This article describes a proposal for analyzing the performance of public Brazilian hospitals using financial and non-financial rates (i.e., operational rates), and thereby highlights the effectiveness (or otherwise) of the financial management of organizations in this study. A total of 72 hospitals in the Brazilian Unified Health Care System (in Portuguese, Sistema Unico de Saúde-SUS), were selected for accessibility and completeness of their data. Twenty-six organizations were used for the study sample, consisting of entities that had publicly disclosed financial statements for the period from 2008 (in particular, via the Internet) and whose operational data could be found in the SUS database. Our proposal, based on models using the method of Data Envelopment Analysis (DEA), was the construction of six initial models that were later compiled into a standard model. The relations between the rates that comprised the models were based on the variables and the notes of: Schuhmann, McCue and Nayar, Barnum and Kutzin, Younis, Younies, and Okojie, Marinho, Moreno, and Cavalini, and Ersoy, Kavuncubasi, Ozcan, and Harris II. We put forward an enhanced grant proposal applicable to Brazil aiming to (i) confirm or refute the rates that show the effectiveness or ineffectiveness of financial management of national hospitals; and (ii) determine the best performances, which could be used as a reference for future studies. Obtained results: (i) for all financial indicators considered, only one showed no significance in all models; and (ii) for operational indicators, the results were not relevant when the number of occupied beds was considered. Though the analysis was related to only services provided by SUS, we conclude that our study has great potential for analyzing the financial management performance of Brazilian hospitals in general, for the following reasons: (i) it shows the relationship of financial and operational rates that can be used to analyze the performance of these organizations; and (ii) it introduces ranges of these values that can be used as standard for the analysis of Brazilian hospitals.
UPEML Version 3.0: A machine-portable CDC update emulator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mehlhorn, T.A.; Haill, T.A.
1992-04-01
UPEML is a machine-portable program that emulates a subset of the functions of the standard CDC Update. Machine-portability has been achieved by conforming to ANSI standards for Fortran-77. UPEML is compact and fairly efficient; however, it only allows a restricted syntax as compared with the CDC Update. This program was written primarily to facilitate the use of CDC-based scientific packages on alternate computer systems such as the VAX/VMS mainframes and UNIX workstations. UPEML has also been successfully used on the multiprocessor ELXSI, on CRAYs under both UNICOS and CTSS operating systems, and on Sun, HP, Stardent and IBM workstations. UPEMLmore » was originally released with the ITS electron/photon Monte Carlo transport package, which was developed on a CDC-7600 and makes extensive use of conditional file structure to combine several problem geometry and machine options into a single program file. UPEML 3.0 is an enhanced version of the original code and is being independently released for use at any installation or with any code package. Version 3.0 includes enhanced error checking, full ASCII character support, a program library audit capability, and a partial update option in which only selected or modified decks are written to the complete file. Version 3.0 also checks for overlapping corrections, allows processing of pested calls to common decks, and allows the use of alternate files in READ and ADDFILE commands. Finally, UPEML Version 3.0 allows the assignment of input and output files at runtime on the control line.« less
UPEML Version 3. 0: A machine-portable CDC update emulator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mehlhorn, T.A.; Haill, T.A.
1992-04-01
UPEML is a machine-portable program that emulates a subset of the functions of the standard CDC Update. Machine-portability has been achieved by conforming to ANSI standards for Fortran-77. UPEML is compact and fairly efficient; however, it only allows a restricted syntax as compared with the CDC Update. This program was written primarily to facilitate the use of CDC-based scientific packages on alternate computer systems such as the VAX/VMS mainframes and UNIX workstations. UPEML has also been successfully used on the multiprocessor ELXSI, on CRAYs under both UNICOS and CTSS operating systems, and on Sun, HP, Stardent and IBM workstations. UPEMLmore » was originally released with the ITS electron/photon Monte Carlo transport package, which was developed on a CDC-7600 and makes extensive use of conditional file structure to combine several problem geometry and machine options into a single program file. UPEML 3.0 is an enhanced version of the original code and is being independently released for use at any installation or with any code package. Version 3.0 includes enhanced error checking, full ASCII character support, a program library audit capability, and a partial update option in which only selected or modified decks are written to the complete file. Version 3.0 also checks for overlapping corrections, allows processing of pested calls to common decks, and allows the use of alternate files in READ and ADDFILE commands. Finally, UPEML Version 3.0 allows the assignment of input and output files at runtime on the control line.« less
Buckler, Denny; Stefanov, Jim
2004-01-01
La region fronteriza de los Estados Unidos y Mexico abarca una gran diversidad de ambientes fisicos y habitaciones, entre los cuales estan los humedales, desiertos, pastos, montanas, y bosques. Estos a su vez son unicos en cuanto a su diversidad de recursos acuaticos minerales, y biologicos. La region se interconecta economica, politica, y socialmente debido a su herencia binacional. En 1995, cerca de 11 millones de habitantes vivian en la zona adyacente a la frontera. Un estudio sugiere que esa poblacion podria doblarse antes del ano 2020.
NASA Technical Reports Server (NTRS)
Tennille, Geoffrey M.; Howser, Lona M.
1993-01-01
This document briefly describes the use of the CRAY supercomputers that are an integral part of the Supercomputing Network Subsystem of the Central Scientific Computing Complex at LaRC. Features of the CRAY supercomputers are covered, including: FORTRAN, C, PASCAL, architectures of the CRAY-2 and CRAY Y-MP, the CRAY UNICOS environment, batch job submittal, debugging, performance analysis, parallel processing, utilities unique to CRAY, and documentation. The document is intended for all CRAY users as a ready reference to frequently asked questions and to more detailed information contained in the vendor manuals. It is appropriate for both the novice and the experienced user.
T-Ping, Cheng; Weckx, Luc Louis Maurice
2008-01-01
The data base of ENT care in the Brazilian public health system (Sistema Unico de Saude - SUS) will help organize public health programs. The following items were investigated in patients aged up to 17 years attended in public health system outpatient units in the city of Mariana, in the ENT screening unit, UNIFESP-EPM, and in CISMISEL: 1) The main otorhinolaryngological diagnoses; 2) The most frequently required exams, drugs, and surgical procedures and their indications; 3) The jobs of parents; the number of siblings; and 4) A statistical analysis and comparison of data in each location. We undertook a prospective study and a statistical analysis of variables that were gathered during the first visit. The age, the parents' salary, the number of siblings aged below 18 years, the presence of rhinitis, ears diseases, the exams, drugs and otological surgeries that were indicated were all statistically significant. The most common diagnosis was mouth breathing. The most common surgery was adenotonsillectomy. The most frequently requested exam was a lateral cranial radiograph. The number of unemployed parents, their poor salaries, and the number of siblings make it difficult for these patients to be treated in any facility other than the public heath system.
Estimated annual cost of arterial hypertension treatment in Brazil.
Dib, Murilo W; Riera, Rachel; Ferraz, Marcos B
2010-02-01
To estimate the direct annual cost of systemic arterial hypertension (SAH) treatment in Brazil's public and private health care systems, assess its economic impact on the total health care budget, and determine its proportion of the 2005 gross domestic product (GDP). A decision tree model was used to determine direct costs based on estimated use of various resources in SAH diagnosis and care, including treatment (medication and non-medication), complementary exams, doctor visits, nutritional assessments, and emergency room visits. Estimated direct annual cost of SAH treatment was approximately US$ 398.9 million for the public health care system and US$ 272.7 million for the private system, representing 0.08% of the 2005 GDP (ranging from 0.05% to 0.16%). With total health care expenses comprising about 7.6% of Brazil's GDP, this cost represented 1.11% of overall health care costs (0.62% to 2.06%)-1.43% of total expenses for the Unified Healthcare System (Sistema Unico de Saúde, SUS) (0.79% to 2.75%) and 0.83% of expenses for the private health care system (0.47% to 1.48%). Conclusion. To guarantee public or private health care based on the principles of universality and equality, with limited available resources, efforts must be focused on educating the population on prevention and treatment compliance in diseases such as SAH that require significant health resources.
RIP-REMOTE INTERACTIVE PARTICLE-TRACER
NASA Technical Reports Server (NTRS)
Rogers, S. E.
1994-01-01
Remote Interactive Particle-tracing (RIP) is a distributed-graphics program which computes particle traces for computational fluid dynamics (CFD) solution data sets. A particle trace is a line which shows the path a massless particle in a fluid will take; it is a visual image of where the fluid is going. The program is able to compute and display particle traces at a speed of about one trace per second because it runs on two machines concurrently. The data used by the program is contained in two files. The solution file contains data on density, momentum and energy quantities of a flow field at discrete points in three-dimensional space, while the grid file contains the physical coordinates of each of the discrete points. RIP requires two computers. A local graphics workstation interfaces with the user for program control and graphics manipulation, and a remote machine interfaces with the solution data set and performs time-intensive computations. The program utilizes two machines in a distributed mode for two reasons. First, the data to be used by the program is usually generated on the supercomputer. RIP avoids having to convert and transfer the data, eliminating any memory limitations of the local machine. Second, as computing the particle traces can be computationally expensive, RIP utilizes the power of the supercomputer for this task. Although the remote site code was developed on a CRAY, it is possible to port this to any supercomputer class machine with a UNIX-like operating system. Integration of a velocity field from a starting physical location produces the particle trace. The remote machine computes the particle traces using the particle-tracing subroutines from PLOT3D/AMES, a CFD post-processing graphics program available from COSMIC (ARC-12779). These routines use a second-order predictor-corrector method to integrate the velocity field. Then the remote program sends graphics tokens to the local machine via a remote-graphics library. The local machine interprets the graphics tokens and draws the particle traces. The program is menu driven. RIP is implemented on the silicon graphics IRIS 3000 (local workstation) with an IRIX operating system and on the CRAY2 (remote station) with a UNICOS 1.0 or 2.0 operating system. The IRIS 4D can be used in place of the IRIS 3000. The program is written in C (67%) and FORTRAN 77 (43%) and has an IRIS memory requirement of 4 MB. The remote and local stations must use the same user ID. PLOT3D/AMES unformatted data sets are required for the remote machine. The program was developed in 1988.
The SGI/Cray T3E: Experiences and Insights
NASA Technical Reports Server (NTRS)
Bernard, Lisa Hamet
1998-01-01
The NASA Goddard Space Flight Center is home to the fifth most powerful supercomputer in the world, a 1024 processor SGI/Cray T3E-600. The original 512 processor system was placed at Goddard in March, 1997 as part of a cooperative agreement between the High Performance Computing and Communications Program's Earth and Space Sciences Project (ESS) and SGI/Cray Research. The goal of this system is to facilitate achievement of the Project milestones of 10, 50 and 100 GFLOPS sustained performance on selected Earth and space science application codes. The additional 512 processors were purchased in March, 1998 by the NASA Earth Science Enterprise for the NASA Seasonal to Interannual Prediction Project (NSIPP). These two "halves" still operate as a single system, and must satisfy the unique requirements of both aforementioned groups, as well as guest researchers from the Earth, space, microgravity, manned space flight and aeronautics communities. Few large scalable parallel systems are configured for capability computing, so models are hard to find. This unique environment has created a challenging system administration task, and has yielded some insights into the supercomputing needs of the various NASA Enterprises, as well as insights into the strengths and weaknesses of the T3E architecture and software. The T3E is a distributed memory system in which the processing elements (PE's) are connected by a low latency, high bandwidth bidirectional 3-D torus. Due to the focus on high speed communication between PE's, the T3E requires PE's to be allocated contiguously per job. Further, jobs will only execute on the user specified number of PE's and PE timesharing is possible but impractical. With a highly varied job mix in both size and runtime of jobs, the resulting scenario is PE fragmentation and an inability to achieve near 100% utilization. SGI/Cray has provided several scheduling and configuration tools to minimize the impact of fragmentation. These tools include PScheD (the political scheduler), GRM (the global resource manager) and NQE (the Network Queuing Environment). Features and impact of these tools will be discussed, as will resulting performance and utilization data. As a distributed memory system, the T3E is designed to be programmed through explicit message passing. Consequently, certain assumptions related to code design are made by the operating system (UNICOS/mk) and its scheduling tools. With the exception of HPF, which does run on the T3E, however poorly, alternative programming styles have the potential to impact the T3E in unexpected and undesirable ways. Several examples will be presented (preceeded with the disclaimer, "Don't try this at home! Violators will be prosecuted!")
[Community-based intervention to control STD/AIDS in the Amazon region, Brazil].
Benzaken, Adele Schwartz; Galbán Garcia, Enrique; Sardinha, José Carlos Gomes; Pedrosa, Valderiza Lourenço; Paiva, Vera
2007-12-01
To describe a case study of community-based intervention, developed in a constructionist-emancipatory framework to control STD/AIDS. Descriptive study developed in the town of Manacapuru, in the state of Amazonas, from 1997 to 2004, focusing on procedures designed in collaboration with government agents, health professionals and the community. Data on the dynamics of prostitution and condom sales in this town, preventive practices and STD/AIDS care and process assessment were collected. Actions targeting STD prevention and care in the public healthcare system, a testing center, an epidemiological surveillance system and sex workers' qualification were established concomitantly. It was observed the strengthening of sex workers as peer educators and their legitimization as citizens and health agents in projects involving transvestites, homosexuals and students. There was an increase in condom sales in town, as well as in condom use among sex workers; reduction in bacterial STD; and stabilization of the incidence of HIV/AIDS infections and congenital syphilis. The sustainability of the intervention program studied, organized within the sphere of action of the Sistema Unico de Saúde (National Health System), was promoted by a political pact, which guaranteed headquarters and municipal law-regulated budget, as well as by the constant debate over the process and program results. The study strengthened the notion that effective control of STD/AIDS depends on a synergic approach that combines interventions on individual (biological-behavioral), sociocultural and programmatic levels.
2DRMP: A suite of two-dimensional R-matrix propagation codes
NASA Astrophysics Data System (ADS)
Scott, N. S.; Scott, M. P.; Burke, P. G.; Stitt, T.; Faro-Maza, V.; Denis, C.; Maniopoulou, A.
2009-12-01
The R-matrix method has proved to be a remarkably stable, robust and efficient technique for solving the close-coupling equations that arise in electron and photon collisions with atoms, ions and molecules. During the last thirty-four years a series of related R-matrix program packages have been published periodically in CPC. These packages are primarily concerned with low-energy scattering where the incident energy is insufficient to ionise the target. In this paper we describe 2DRMP, a suite of two-dimensional R-matrix propagation programs aimed at creating virtual experiments on high performance and grid architectures to enable the study of electron scattering from H-like atoms and ions at intermediate energies. Program summaryProgram title: 2DRMP Catalogue identifier: AEEA_v1_0 Program summary URL:http://cpc.cs.qub.ac.uk/summaries/AEEA_v1_0.html Program obtainable from: CPC Program Library, Queen's University, Belfast, N. Ireland Licensing provisions: Standard CPC licence, http://cpc.cs.qub.ac.uk/licence/licence.html No. of lines in distributed program, including test data, etc.: 196 717 No. of bytes in distributed program, including test data, etc.: 3 819 727 Distribution format: tar.gz Programming language: Fortran 95, MPI Computer: Tested on CRAY XT4 [1]; IBM eServer 575 [2]; Itanium II cluster [3] Operating system: Tested on UNICOS/lc [1]; IBM AIX [2]; Red Hat Linux Enterprise AS [3] Has the code been vectorised or parallelised?: Yes. 16 cores were used for small test run Classification: 2.4 External routines: BLAS, LAPACK, PBLAS, ScaLAPACK Subprograms used: ADAZ_v1_1 Nature of problem: 2DRMP is a suite of programs aimed at creating virtual experiments on high performance architectures to enable the study of electron scattering from H-like atoms and ions at intermediate energies. Solution method: Two-dimensional R-matrix propagation theory. The (r,r) space of the internal region is subdivided into a number of subregions. Local R-matrices are constructed within each subregion and used to propagate a global R-matrix, ℜ, across the internal region. On the boundary of the internal region ℜ is transformed onto the IERM target state basis. Thus, the two-dimensional R-matrix propagation technique transforms an intractable problem into a series of tractable problems enabling the internal region to be extended far beyond that which is possible with the standard one-sector codes. A distinctive feature of the method is that both electrons are treated identically and the R-matrix basis states are constructed to allow for both electrons to be in the continuum. The subregion size is flexible and can be adjusted to accommodate the number of cores available. Restrictions: The implementation is currently restricted to electron scattering from H-like atoms and ions. Additional comments: The programs have been designed to operate on serial computers and to exploit the distributed memory parallelism found on tightly coupled high performance clusters and supercomputers. 2DRMP has been systematically and comprehensively documented using ROBODoc [4] which is an API documentation tool that works by extracting specially formatted headers from the program source code and writing them to documentation files. Running time: The wall clock running time for the small test run using 16 cores and performed on [3] is as follows: bp (7 s); rint2 (34 s); newrd (32 s); diag (21 s); amps (11 s); prop (24 s). References:HECToR, CRAY XT4 running UNICOS/lc, http://www.hector.ac.uk/, accessed 22 July, 2009. HPCx, IBM eServer 575 running IBM AIX, http://www.hpcx.ac.uk/, accessed 22 July, 2009. HP Cluster, Itanium II cluster running Red Hat Linux Enterprise AS, Queen s University Belfast, http://www.qub.ac.uk/directorates/InformationServices/Research/HighPerformanceComputing/Services/Hardware/HPResearch/, accessed 22 July, 2009. Automating Software Documentation with ROBODoc, http://www.xs4all.nl/~rfsber/Robo/, accessed 22 July, 2009.
An installed nacelle design code using a multiblock Euler solver. Volume 2: User guide
NASA Technical Reports Server (NTRS)
Chen, H. C.
1992-01-01
This is a user manual for the general multiblock Euler design (GMBEDS) code. The code is for the design of a nacelle installed on a geometrically complex configuration such as a complete airplane with wing/body/nacelle/pylon. It consists of two major building blocks: a design module developed by LaRC using directive iterative surface curvature (DISC); and a general multiblock Euler (GMBE) flow solver. The flow field surrounding a complex configuration is divided into a number of topologically simple blocks to facilitate surface-fitted grid generation and improve flow solution efficiency. This user guide provides input data formats along with examples of input files and a Unix script for program execution in the UNICOS environment.
NETS - A NEURAL NETWORK DEVELOPMENT TOOL, VERSION 3.0 (MACINTOSH VERSION)
NASA Technical Reports Server (NTRS)
Phillips, T. A.
1994-01-01
NETS, A Tool for the Development and Evaluation of Neural Networks, provides a simulation of Neural Network algorithms plus an environment for developing such algorithms. Neural Networks are a class of systems modeled after the human brain. Artificial Neural Networks are formed from hundreds or thousands of simulated neurons, connected to each other in a manner similar to brain neurons. Problems which involve pattern matching readily fit the class of problems which NETS is designed to solve. NETS uses the back propagation learning method for all of the networks which it creates. The nodes of a network are usually grouped together into clumps called layers. Generally, a network will have an input layer through which the various environment stimuli are presented to the network, and an output layer for determining the network's response. The number of nodes in these two layers is usually tied to some features of the problem being solved. Other layers, which form intermediate stops between the input and output layers, are called hidden layers. NETS allows the user to customize the patterns of connections between layers of a network. NETS also provides features for saving the weight values of a network during the learning process, which allows for more precise control over the learning process. NETS is an interpreter. Its method of execution is the familiar "read-evaluate-print" loop found in interpreted languages such as BASIC and LISP. The user is presented with a prompt which is the simulator's way of asking for input. After a command is issued, NETS will attempt to evaluate the command, which may produce more prompts requesting specific information or an error if the command is not understood. The typical process involved when using NETS consists of translating the problem into a format which uses input/output pairs, designing a network configuration for the problem, and finally training the network with input/output pairs until an acceptable error is reached. NETS allows the user to generate C code to implement the network loaded into the system. This permits the placement of networks as components, or subroutines, in other systems. In short, once a network performs satisfactorily, the Generate C Code option provides the means for creating a program separate from NETS to run the network. Other features: files may be stored in binary or ASCII format; multiple input propagation is permitted; bias values may be included; capability to scale data without writing scaling code; quick interactive testing of network from the main menu; and several options that allow the user to manipulate learning efficiency. NETS is written in ANSI standard C language to be machine independent. The Macintosh version (MSC-22108) includes code for both a graphical user interface version and a command line interface version. The machine independent version (MSC-21588) only includes code for the command line interface version of NETS 3.0. The Macintosh version requires a Macintosh II series computer and has been successfully implemented under System 7. Four executables are included on these diskettes, two for floating point operations and two for integer arithmetic. It requires Think C 5.0 to compile. A minimum of 1Mb of RAM is required for execution. Sample input files and executables for both the command line version and the Macintosh user interface version are provided on the distribution medium. The Macintosh version is available on a set of three 3.5 inch 800K Macintosh format diskettes. The machine independent version has been successfully implemented on an IBM PC series compatible running MS-DOS, a DEC VAX running VMS, a SunIPC running SunOS, and a CRAY Y-MP running UNICOS. Two executables for the IBM PC version are included on the MS-DOS distribution media, one compiled for floating point operations and one for integer arithmetic. The machine independent version is available on a set of three 5.25 inch 360K MS-DOS format diskettes (standard distribution medium) or a .25 inch streaming magnetic tape cartridge in UNIX tar format. NETS was developed in 1989 and updated in 1992. IBM PC is a registered trademark of International Business Machines. MS-DOS is a registered trademark of Microsoft Corporation. DEC, VAX, and VMS are trademarks of Digital Equipment Corporation. SunIPC and SunOS are trademarks of Sun Microsystems, Inc. CRAY Y-MP and UNICOS are trademarks of Cray Research, Inc.
NETS - A NEURAL NETWORK DEVELOPMENT TOOL, VERSION 3.0 (MACHINE INDEPENDENT VERSION)
NASA Technical Reports Server (NTRS)
Baffes, P. T.
1994-01-01
NETS, A Tool for the Development and Evaluation of Neural Networks, provides a simulation of Neural Network algorithms plus an environment for developing such algorithms. Neural Networks are a class of systems modeled after the human brain. Artificial Neural Networks are formed from hundreds or thousands of simulated neurons, connected to each other in a manner similar to brain neurons. Problems which involve pattern matching readily fit the class of problems which NETS is designed to solve. NETS uses the back propagation learning method for all of the networks which it creates. The nodes of a network are usually grouped together into clumps called layers. Generally, a network will have an input layer through which the various environment stimuli are presented to the network, and an output layer for determining the network's response. The number of nodes in these two layers is usually tied to some features of the problem being solved. Other layers, which form intermediate stops between the input and output layers, are called hidden layers. NETS allows the user to customize the patterns of connections between layers of a network. NETS also provides features for saving the weight values of a network during the learning process, which allows for more precise control over the learning process. NETS is an interpreter. Its method of execution is the familiar "read-evaluate-print" loop found in interpreted languages such as BASIC and LISP. The user is presented with a prompt which is the simulator's way of asking for input. After a command is issued, NETS will attempt to evaluate the command, which may produce more prompts requesting specific information or an error if the command is not understood. The typical process involved when using NETS consists of translating the problem into a format which uses input/output pairs, designing a network configuration for the problem, and finally training the network with input/output pairs until an acceptable error is reached. NETS allows the user to generate C code to implement the network loaded into the system. This permits the placement of networks as components, or subroutines, in other systems. In short, once a network performs satisfactorily, the Generate C Code option provides the means for creating a program separate from NETS to run the network. Other features: files may be stored in binary or ASCII format; multiple input propagation is permitted; bias values may be included; capability to scale data without writing scaling code; quick interactive testing of network from the main menu; and several options that allow the user to manipulate learning efficiency. NETS is written in ANSI standard C language to be machine independent. The Macintosh version (MSC-22108) includes code for both a graphical user interface version and a command line interface version. The machine independent version (MSC-21588) only includes code for the command line interface version of NETS 3.0. The Macintosh version requires a Macintosh II series computer and has been successfully implemented under System 7. Four executables are included on these diskettes, two for floating point operations and two for integer arithmetic. It requires Think C 5.0 to compile. A minimum of 1Mb of RAM is required for execution. Sample input files and executables for both the command line version and the Macintosh user interface version are provided on the distribution medium. The Macintosh version is available on a set of three 3.5 inch 800K Macintosh format diskettes. The machine independent version has been successfully implemented on an IBM PC series compatible running MS-DOS, a DEC VAX running VMS, a SunIPC running SunOS, and a CRAY Y-MP running UNICOS. Two executables for the IBM PC version are included on the MS-DOS distribution media, one compiled for floating point operations and one for integer arithmetic. The machine independent version is available on a set of three 5.25 inch 360K MS-DOS format diskettes (standard distribution medium) or a .25 inch streaming magnetic tape cartridge in UNIX tar format. NETS was developed in 1989 and updated in 1992. IBM PC is a registered trademark of International Business Machines. MS-DOS is a registered trademark of Microsoft Corporation. DEC, VAX, and VMS are trademarks of Digital Equipment Corporation. SunIPC and SunOS are trademarks of Sun Microsystems, Inc. CRAY Y-MP and UNICOS are trademarks of Cray Research, Inc.
NASA Technical Reports Server (NTRS)
Chen, H. C.; Neback, H. E.; Kao, T. J.; Yu, N. Y.; Kusunose, K.
1991-01-01
This manual explains how to use an Euler based computational method for predicting the airframe/propulsion integration effects for an aft-mounted turboprop transport. The propeller power effects are simulated by the actuator disk concept. This method consists of global flow field analysis and the embedded flow solution for predicting the detailed flow characteristics in the local vicinity of an aft-mounted propfan engine. The computational procedure includes the use of several computer programs performing four main functions: grid generation, Euler solution, grid embedding, and streamline tracing. This user's guide provides information for these programs, including input data preparations with sample input decks, output descriptions, and sample Unix scripts for program execution in the UNICOS environment.
Autotasked Performance in the NAS Workload: A Statistical Analysis
NASA Technical Reports Server (NTRS)
Carter, R. L.; Stockdale, I. E.; Kutler, Paul (Technical Monitor)
1998-01-01
A statistical analysis of the workload performance of a production quality FORTRAN code for five different Cray Y-MP hardware and system software configurations is performed. The analysis was based on an experimental procedure that was designed to minimize correlations between the number of requested CPUs and the time of day the runs were initiated. Observed autotasking over heads were significantly larger for the set of jobs that requested the maximum number of CPUs. Speedups for UNICOS 6 releases show consistent wall clock speedups in the workload of around 2. which is quite good. The observed speed ups were very similar for the set of jobs that requested 8 CPUs and the set that requested 4 CPUs. The original NAS algorithm for determining charges to the user discourages autotasking in the workload. A new charging algorithm to be applied to jobs run in the NQS multitasking queues also discourages NAS users from using auto tasking. The new algorithm favors jobs requesting 8 CPUs over those that request less, although the jobs requesting 8 CPUs experienced significantly higher over head and presumably degraded system throughput. A charging algorithm is presented that has the following desirable characteristics when applied to the data: higher overhead jobs requesting 8 CPUs are penalized when compared to moderate overhead jobs requesting 4 CPUs, thereby providing a charging incentive to NAS users to use autotasking in a manner that provides them with significantly improved turnaround while also maintaining system throughput.
HEAT.PRO - THERMAL IMBALANCE FORCE SIMULATION AND ANALYSIS USING PDE2D
NASA Technical Reports Server (NTRS)
Vigue, Y.
1994-01-01
HEAT.PRO calculates the thermal imbalance force resulting from satellite surface heating. The heated body of a satellite re-radiates energy at a rate that is proportional to its temperature, losing the energy in the form of photons. By conservation of momentum, this momentum flux out of the body creates a reaction force against the radiation surface, and the net thermal force can be observed as a small perturbation that affects long term orbital behavior of the satellite. HEAT.PRO calculates this thermal imbalance force and then determines its effects on satellite orbits, especially where the Earth's shadowing of an orbiting satellite causes periodic changes in the spacecraft's thermal environment. HEAT.PRO implements a finite element method routine called PDE2D which incorporates material properties to determine the solar panel surface temperatures. The nodal temperatures are computed at specified time steps and are used to determine the magnitude and direction of the thermal force on the spacecraft. These calculations are based on the solar panel orientation and satellite's position with respect to the earth and sun. It is necessary to have accurate, current knowledge of surface emissivity, thermal conductivity, heat capacity, and material density. These parameters, which may change due to degradation of materials in the environment of space, influence the nodal temperatures that are computed and thus the thermal force calculations. HEAT.PRO was written in FORTRAN 77 for Cray series computers running UNICOS. The source code contains directives for and is used as input to the required partial differential equation solver, PDE2D. HEAT.PRO is available on a 9-track 1600 BPI magnetic tape in UNIX tar format (standard distribution medium) or a .25 inch streaming magnetic tape cartridge in UNIX tar format. An electronic copy of the documentation in Macintosh Microsoft Word format is included on the distribution tape. HEAT.PRO was developed in 1991. Cray and UNICOS are registered trademarks of Cray Research, Inc. UNIX is a trademark of AT&T Bell Laboratories. PDE2D is available from Granville Sewell, Mathematics Dept., University of Texas at El Paso, El Paso, Texas 79968.
Fortran graphics routines for the Macintosh
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shore, B.W.
1992-06-01
The Language Systems MPW Fortran is a popular Fortran compiler for the Macintosh. Unfortunately, it does not have any built-in calls to graphics routines (such as are available with Graflib on the NLTSS), so there is no simple way to make x-y plots from calls within Fortran. Instead, a file of data must be created and a commercial plotting routine (such as IGOR or KALEIDAGRAPH) or a spreadsheet with graphics (such as WINGZ) must be applied to post-process the data. The Macintosh does have available many built-in calls (to the Macintosh Toolbox) that allow drawing shapes and lines with quickdraw,more » but these are not designed for plotting functions and are difficult to learn to use. This work outlines some Fortran routines that can be called from LS Fortran to make the necessary calls to the Macintosh toolbox to create simple two-dimensional plots or contour plots. The source code DEMOGRAF.F shows how these routines may be used. DEMOGRAF.F simply demonstrates some Fortran subroutines that can be called with language systems MPW Fortran on the Macintosh to plot arrays of numbers. The subroutines essentially mimic the functionality that has been available at LTSS and NLTSS and UNICOS at LLNL. The graphics primitives are kept in four separate files, each containing several subroutines. The subroutines are compiled and stored in a library file, LIBgraf.o. Makefile is used to link this library to the source code. A discussion is included on requirements for interactive plotting of functions.« less
[The public health care system and rehabilitation actions in Brazil].
Ribeiro, Carla Trevisan Martins; Ribeiro, Marcia Gonçalves; Araújo, Alexandra Prufer; Mello, Lívia Rodrigues; Rubim, Luciana da Cruz; Ferreira, Joyce Espírito Santo
2010-07-01
To produce a historical account of rehabilitation actions in the context of the Brazilian Unified Health Care System (SUS). Search of SciELO, LILACS, and MEDLINE databases for literature published between 1980 and 2009. The following Portuguese search terms were used: Sistema Unico de Saúde, reabilitação, políticas de saúde, assistência médica, história. The English terms "rehabilitation" and "public health" were also used. Federal laws and Ministry of Health manuals available at the city of Rio de Janeiro Coordinating Office for Rehabilitation Programs, Fundação Instituto Oswaldo Cruz library, and in BIREME database were also surveyed. Only a small number of publications were recovered (four books, three Health Ministry manuals, four articles published in Brazil, one master's thesis, and one doctoral dissertation). Nevertheless, analysis of these materials revealed that since many municipalities are still incapable of ensuring the right to universal and comprehensive health care, rehabilitation actions are often carried out in a precarious manner, unsupported by an adequate and comprehensive policy. On the other hand, there have been real improvements in terms of expanding care to the population with special needs. There still are factors hindering the achievement of optimal results in the care to people with special needs. The challenge of action planning must be undertaken especially by municipal governments to ensure an adequate supply of services and thus equity of access and comprehensive health care.
User's manual for PANDA II: A computer code for calculating equations of state
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kerley, G.I.
1991-07-18
PANDA is an interactive computer code that is used to compute equations of state (EOS) for many classes of materials over a wide range of densities and temperatures. The first step in the development of a general EOS model is to determine the EOS for a one- component system, consisting of a single solid or fluid phase and a single chemical species. The results of several such calculations can then be combined to construct EOS for multiphase and multicomponent systems. For one-component solids and fluids, PANDA offers a variety of options for modeling various contributions to the EOS: the zeromore » Kelvin isotherm, lattice vibrations, fluid degrees of freedom, thermal electronic excitation and ionization, and molecular vibrational and rotational degrees of freedom. Two options are available for computing EOS for multicomponent systems from separate EOS for the individual species and phases. The phase transition model is used for a system of immiscible phases, each having the same chemical composition. In the mixture model, the components can be either miscible or immiscible and can have different chemical compositions; mixtures cab be either inert or reactive. PANDA provides over 50 commands that are used to define the EOS models, to make calculations and compare the models to experimental data, and to generate and maintain tabular EOS libraries for use in hydrocodes and other applications. Versions of the code available for the Cray (UNICOS and CTSS), SUN (UNIX), and VAX(VMS) machines, and a small version is available for personal computers (DOS). This report describes the EOS models, use of the commands, and several sample problems. 92 refs., 7 figs., 10 tabs.« less
[Diagnosis on the unique curriculum of the medical career at the National University of Mexico].
Guevara Guzmán, Rosalinda; Urrutia Aguilar, María Esther
2011-01-01
The analysis of the Plan Unico de Estudios of the medical career was the result of five years of collegiate work in which commissions consisting of academic staff of different departments from the faculty of medicine at the Universidad Nacional Autonoma de Mexico (UNAM) participated. The most significant conclusions derived from this analysis are: to adjust the graduate’s profile in order to face the emerging health problems of the twenty-first century in our country; to update the academic curricula of the different subjects, including new ones; to create a nuclear curricula; as well as to strengthen the basic-clinic and the clinic-basic. With regard to the teaching/learning process, we acknowledged the need to develop self-cognitive and self-motivational skills in students as well as to consider a different evaluation for students and teachers.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Özen, Soner, E-mail: osoner@ogu.edu.tr; Pat, Suat; Korkmaz, Şadan
This study discusses the influence of working pressure on the surface energy of the ITO thin films produced by radio frequency magnetron sputtering method. Optical tensiometer (Attension Theta Lite) is used for evaluating wetting behavior of the water droplet on the film surface and Equation of State method was selected to determine surface free energy for this study. Equation of state method does not divide the surface tension into different components such as polar, dispersive, acid-base. It is calculated the surfaces’ free energy measuring the contact angle with a single liquid. The surface free energy value was in the rangemore » of 15-31 mN/m. Also, the transmittances were determined in the wavelength range between 200 and 1000 nm using the UNICO 4802 UV-Vis double beam spectrophotometer. Transmittances of the produced ITO thin films are greater than %70 in the visible range.« less
A general multiblock Euler code for propulsion integration. Volume 3: User guide for the Euler code
NASA Technical Reports Server (NTRS)
Chen, H. C.; Su, T. Y.; Kao, T. J.
1991-01-01
This manual explains the procedures for using the general multiblock Euler (GMBE) code developed under NASA contract NAS1-18703. The code was developed for the aerodynamic analysis of geometrically complex configurations in either free air or wind tunnel environments (vol. 1). The complete flow field is divided into a number of topologically simple blocks within each of which surface fitted grids and efficient flow solution algorithms can easily be constructed. The multiblock field grid is generated with the BCON procedure described in volume 2. The GMBE utilizes a finite volume formulation with an explicit time stepping scheme to solve the Euler equations. A multiblock version of the multigrid method was developed to accelerate the convergence of the calculations. This user guide provides information on the GMBE code, including input data preparations with sample input files and a sample Unix script for program execution in the UNICOS environment.
TRASYS - THERMAL RADIATION ANALYZER SYSTEM (DEC VAX VERSION WITH NASADIG)
NASA Technical Reports Server (NTRS)
Anderson, G. E.
1994-01-01
The Thermal Radiation Analyzer System, TRASYS, is a computer software system with generalized capability to solve the radiation related aspects of thermal analysis problems. TRASYS computes the total thermal radiation environment for a spacecraft in orbit. The software calculates internode radiation interchange data as well as incident and absorbed heat rate data originating from environmental radiant heat sources. TRASYS provides data of both types in a format directly usable by such thermal analyzer programs as SINDA/FLUINT (available from COSMIC, program number MSC-21528). One primary feature of TRASYS is that it allows users to write their own driver programs to organize and direct the preprocessor and processor library routines in solving specific thermal radiation problems. The preprocessor first reads and converts the user's geometry input data into the form used by the processor library routines. Then, the preprocessor accepts the user's driving logic, written in the TRASYS modified FORTRAN language. In many cases, the user has a choice of routines to solve a given problem. Users may also provide their own routines where desirable. In particular, the user may write output routines to provide for an interface between TRASYS and any thermal analyzer program using the R-C network concept. Input to the TRASYS program consists of Options and Edit data, Model data, and Logic Flow and Operations data. Options and Edit data provide for basic program control and user edit capability. The Model data describe the problem in terms of geometry and other properties. This information includes surface geometry data, documentation data, nodal data, block coordinate system data, form factor data, and flux data. Logic Flow and Operations data house the user's driver logic, including the sequence of subroutine calls and the subroutine library. Output from TRASYS consists of two basic types of data: internode radiation interchange data, and incident and absorbed heat rate data. The flexible structure of TRASYS allows considerable freedom in the definition and choice of solution method for a thermal radiation problem. The program's flexible structure has also allowed TRASYS to retain the same basic input structure as the authors update it in order to keep up with changing requirements. Among its other important features are the following: 1) up to 3200 node problem size capability with shadowing by intervening opaque or semi-transparent surfaces; 2) choice of diffuse, specular, or diffuse/specular radiant interchange solutions; 3) a restart capability that minimizes recomputing; 4) macroinstructions that automatically provide the executive logic for orbit generation that optimizes the use of previously completed computations; 5) a time variable geometry package that provides automatic pointing of the various parts of an articulated spacecraft and an automatic look-back feature that eliminates redundant form factor calculations; 6) capability to specify submodel names to identify sets of surfaces or components as an entity; and 7) subroutines to perform functions which save and recall the internodal and/or space form factors in subsequent steps for nodes with fixed geometry during a variable geometry run. There are two machine versions of TRASYS v27: a DEC VAX version and a Cray UNICOS version. Both versions require installation of the NASADIG library (MSC-21801 for DEC VAX or COS-10049 for CRAY), which is available from COSMIC either separately or bundled with TRASYS. The NASADIG (NASA Device Independent Graphics Library) plot package provides a pictorial representation of input geometry, orbital/orientation parameters, and heating rate output as a function of time. NASADIG supports Tektronix terminals. The CRAY version of TRASYS v27 is written in FORTRAN 77 for batch or interactive execution and has been implemented on CRAY X-MP and CRAY Y-MP series computers running UNICOS. The standard distribution medium for MSC-21959 (CRAY version without NASADIG) is a 1600 BPI 9-track magnetic tape in UNIX tar format. The standard distribution medium for COS-10040 (CRAY version with NASADIG) is a set of two 6250 BPI 9-track magnetic tapes in UNIX tar format. Alternate distribution media and formats are available upon request. The DEC VAX version of TRASYS v27 is written in FORTRAN 77 for batch execution (only the plotting driver program is interactive) and has been implemented on a DEC VAX 8650 computer under VMS. Since the source codes for MSC-21030 and COS-10026 are in VAX/VMS text library files and DEC Command Language files, COSMIC will only provide these programs in the following formats: MSC-21030, TRASYS (DEC VAX version without NASADIG) is available on a 1600 BPI 9-track magnetic tape in VAX BACKUP format (standard distribution medium) or in VAX BACKUP format on a TK50 tape cartridge; COS-10026, TRASYS (DEC VAX version with NASADIG), is available in VAX BACKUP format on a set of three 6250 BPI 9-track magnetic tapes (standard distribution medium) or a set of three TK50 tape cartridges in VAX BACKUP format. TRASYS was last updated in 1993.
TRASYS - THERMAL RADIATION ANALYZER SYSTEM (CRAY VERSION WITH NASADIG)
NASA Technical Reports Server (NTRS)
Anderson, G. E.
1994-01-01
The Thermal Radiation Analyzer System, TRASYS, is a computer software system with generalized capability to solve the radiation related aspects of thermal analysis problems. TRASYS computes the total thermal radiation environment for a spacecraft in orbit. The software calculates internode radiation interchange data as well as incident and absorbed heat rate data originating from environmental radiant heat sources. TRASYS provides data of both types in a format directly usable by such thermal analyzer programs as SINDA/FLUINT (available from COSMIC, program number MSC-21528). One primary feature of TRASYS is that it allows users to write their own driver programs to organize and direct the preprocessor and processor library routines in solving specific thermal radiation problems. The preprocessor first reads and converts the user's geometry input data into the form used by the processor library routines. Then, the preprocessor accepts the user's driving logic, written in the TRASYS modified FORTRAN language. In many cases, the user has a choice of routines to solve a given problem. Users may also provide their own routines where desirable. In particular, the user may write output routines to provide for an interface between TRASYS and any thermal analyzer program using the R-C network concept. Input to the TRASYS program consists of Options and Edit data, Model data, and Logic Flow and Operations data. Options and Edit data provide for basic program control and user edit capability. The Model data describe the problem in terms of geometry and other properties. This information includes surface geometry data, documentation data, nodal data, block coordinate system data, form factor data, and flux data. Logic Flow and Operations data house the user's driver logic, including the sequence of subroutine calls and the subroutine library. Output from TRASYS consists of two basic types of data: internode radiation interchange data, and incident and absorbed heat rate data. The flexible structure of TRASYS allows considerable freedom in the definition and choice of solution method for a thermal radiation problem. The program's flexible structure has also allowed TRASYS to retain the same basic input structure as the authors update it in order to keep up with changing requirements. Among its other important features are the following: 1) up to 3200 node problem size capability with shadowing by intervening opaque or semi-transparent surfaces; 2) choice of diffuse, specular, or diffuse/specular radiant interchange solutions; 3) a restart capability that minimizes recomputing; 4) macroinstructions that automatically provide the executive logic for orbit generation that optimizes the use of previously completed computations; 5) a time variable geometry package that provides automatic pointing of the various parts of an articulated spacecraft and an automatic look-back feature that eliminates redundant form factor calculations; 6) capability to specify submodel names to identify sets of surfaces or components as an entity; and 7) subroutines to perform functions which save and recall the internodal and/or space form factors in subsequent steps for nodes with fixed geometry during a variable geometry run. There are two machine versions of TRASYS v27: a DEC VAX version and a Cray UNICOS version. Both versions require installation of the NASADIG library (MSC-21801 for DEC VAX or COS-10049 for CRAY), which is available from COSMIC either separately or bundled with TRASYS. The NASADIG (NASA Device Independent Graphics Library) plot package provides a pictorial representation of input geometry, orbital/orientation parameters, and heating rate output as a function of time. NASADIG supports Tektronix terminals. The CRAY version of TRASYS v27 is written in FORTRAN 77 for batch or interactive execution and has been implemented on CRAY X-MP and CRAY Y-MP series computers running UNICOS. The standard distribution medium for MSC-21959 (CRAY version without NASADIG) is a 1600 BPI 9-track magnetic tape in UNIX tar format. The standard distribution medium for COS-10040 (CRAY version with NASADIG) is a set of two 6250 BPI 9-track magnetic tapes in UNIX tar format. Alternate distribution media and formats are available upon request. The DEC VAX version of TRASYS v27 is written in FORTRAN 77 for batch execution (only the plotting driver program is interactive) and has been implemented on a DEC VAX 8650 computer under VMS. Since the source codes for MSC-21030 and COS-10026 are in VAX/VMS text library files and DEC Command Language files, COSMIC will only provide these programs in the following formats: MSC-21030, TRASYS (DEC VAX version without NASADIG) is available on a 1600 BPI 9-track magnetic tape in VAX BACKUP format (standard distribution medium) or in VAX BACKUP format on a TK50 tape cartridge; COS-10026, TRASYS (DEC VAX version with NASADIG), is available in VAX BACKUP format on a set of three 6250 BPI 9-track magnetic tapes (standard distribution medium) or a set of three TK50 tape cartridges in VAX BACKUP format. TRASYS was last updated in 1993.
TRASYS - THERMAL RADIATION ANALYZER SYSTEM (DEC VAX VERSION WITHOUT NASADIG)
NASA Technical Reports Server (NTRS)
Vogt, R. A.
1994-01-01
The Thermal Radiation Analyzer System, TRASYS, is a computer software system with generalized capability to solve the radiation related aspects of thermal analysis problems. TRASYS computes the total thermal radiation environment for a spacecraft in orbit. The software calculates internode radiation interchange data as well as incident and absorbed heat rate data originating from environmental radiant heat sources. TRASYS provides data of both types in a format directly usable by such thermal analyzer programs as SINDA/FLUINT (available from COSMIC, program number MSC-21528). One primary feature of TRASYS is that it allows users to write their own driver programs to organize and direct the preprocessor and processor library routines in solving specific thermal radiation problems. The preprocessor first reads and converts the user's geometry input data into the form used by the processor library routines. Then, the preprocessor accepts the user's driving logic, written in the TRASYS modified FORTRAN language. In many cases, the user has a choice of routines to solve a given problem. Users may also provide their own routines where desirable. In particular, the user may write output routines to provide for an interface between TRASYS and any thermal analyzer program using the R-C network concept. Input to the TRASYS program consists of Options and Edit data, Model data, and Logic Flow and Operations data. Options and Edit data provide for basic program control and user edit capability. The Model data describe the problem in terms of geometry and other properties. This information includes surface geometry data, documentation data, nodal data, block coordinate system data, form factor data, and flux data. Logic Flow and Operations data house the user's driver logic, including the sequence of subroutine calls and the subroutine library. Output from TRASYS consists of two basic types of data: internode radiation interchange data, and incident and absorbed heat rate data. The flexible structure of TRASYS allows considerable freedom in the definition and choice of solution method for a thermal radiation problem. The program's flexible structure has also allowed TRASYS to retain the same basic input structure as the authors update it in order to keep up with changing requirements. Among its other important features are the following: 1) up to 3200 node problem size capability with shadowing by intervening opaque or semi-transparent surfaces; 2) choice of diffuse, specular, or diffuse/specular radiant interchange solutions; 3) a restart capability that minimizes recomputing; 4) macroinstructions that automatically provide the executive logic for orbit generation that optimizes the use of previously completed computations; 5) a time variable geometry package that provides automatic pointing of the various parts of an articulated spacecraft and an automatic look-back feature that eliminates redundant form factor calculations; 6) capability to specify submodel names to identify sets of surfaces or components as an entity; and 7) subroutines to perform functions which save and recall the internodal and/or space form factors in subsequent steps for nodes with fixed geometry during a variable geometry run. There are two machine versions of TRASYS v27: a DEC VAX version and a Cray UNICOS version. Both versions require installation of the NASADIG library (MSC-21801 for DEC VAX or COS-10049 for CRAY), which is available from COSMIC either separately or bundled with TRASYS. The NASADIG (NASA Device Independent Graphics Library) plot package provides a pictorial representation of input geometry, orbital/orientation parameters, and heating rate output as a function of time. NASADIG supports Tektronix terminals. The CRAY version of TRASYS v27 is written in FORTRAN 77 for batch or interactive execution and has been implemented on CRAY X-MP and CRAY Y-MP series computers running UNICOS. The standard distribution medium for MSC-21959 (CRAY version without NASADIG) is a 1600 BPI 9-track magnetic tape in UNIX tar format. The standard distribution medium for COS-10040 (CRAY version with NASADIG) is a set of two 6250 BPI 9-track magnetic tapes in UNIX tar format. Alternate distribution media and formats are available upon request. The DEC VAX version of TRASYS v27 is written in FORTRAN 77 for batch execution (only the plotting driver program is interactive) and has been implemented on a DEC VAX 8650 computer under VMS. Since the source codes for MSC-21030 and COS-10026 are in VAX/VMS text library files and DEC Command Language files, COSMIC will only provide these programs in the following formats: MSC-21030, TRASYS (DEC VAX version without NASADIG) is available on a 1600 BPI 9-track magnetic tape in VAX BACKUP format (standard distribution medium) or in VAX BACKUP format on a TK50 tape cartridge; COS-10026, TRASYS (DEC VAX version with NASADIG), is available in VAX BACKUP format on a set of three 6250 BPI 9-track magnetic tapes (standard distribution medium) or a set of three TK50 tape cartridges in VAX BACKUP format. TRASYS was last updated in 1993.
[Characterization of assistance among philanthropic hospitals in Brazil].
Portela, Margareth C; Lima, Sheyla M L; Barbosa, Pedro R; Vasconcellos, Miguel M; Ugá, Maria Alícia D; Gerschman, Silvia
2004-12-01
To characterize the Brazilian philanthropic hospital network and its relation to the public and private sectors of the Sistema Unico de Saude (SUS) [Brazilian Unified Health System]. This is a descriptive study that took into consideration the geographic distribution, number of beds, available biomedical equipment, health care complexity as well as the productive and consumer profiles of philanthropic hospitals. It is based on a sample of 175 hospitals, within a universe of 1,917, involving 102 distinct institutions. Among these, there were 66 Brazilian Unified Health System (SUS) inpatient care providers with less than 599 beds randomly included in this study. Twenty-six of the twenty-seven SUS inpatient care providers with at least 599 beds, as well as ten institutions which do not provide their services to SUS, were also included. This is a cross-sectional study and the data was obtained in 2001. Data collection was conducted by trained researchers, who applied a questionnaire in interviews with the hospital's managers. Within the random sample, 81.2% of the hospitals are located in cities outside of metropolitan areas, and 53.6% of these are the only hospitals within their municipalities. Basic clinical hospitals, without ICUs, predominate within the random sample (44.9%). Among the individual hospitals of the large philanthropic institutions and the special hospitals, the majority -- 53% and 60% respectively -- are level II general hospitals, a category of greater complexity. It was verified that complexity of care was associated to hospital size, being that hospitals with the greatest complexity are situated predominantly in the capitals. Given the importance of the philanthropic hospital sector within the SUS [Unified Health System] in Brazil, this paper identifies some ways of formulating appropriate health policies adjusted to the specificities of its different segments.
Health care in a community of followers of traditional African-Brazilian religions.
Alves, Miriam Cristiane; Seminotti, Nedio
2009-08-01
To understand the concept of health and the source of psychological distress among followers of a traditional African-Brazilian religion. Qualitative study performed in a community of followers of a traditional African-Brazilian religion, in the city of Porto Alegre, Southern Brazil, between 2007 and 2008. The priest/Babalorixá and six followers of this community participated in the study. Open interviews, which were recorded and subsequently transcribed, were conducted to collect data and construct the corpus of analysis. Report categorization, based on the complex systemic approach, enabled the construction of two main themes: 1) religious community and concept of health, and 2) origin of psychological distress and cultural identity. In this religious community, traditional health therapies, such as the use of herbs, baths, diets and/or initiation rites, were associated with conventional therapies proposed by the Sistema Unico de Saúde (SUS - Unified Health System). Bonds with and belonging to a territory, the relationships among individuals, and the relationship among their spiritual, psychological and physical dimensions are considered in their concepts of psychological distress and health. The way to understand and act in the world, as experienced in this community, with its myths, rites, beliefs and values, constitutes a set of legitimate types of knowledge in its context, which oftentimes opposes and goes beyond professionals' technical-scientific knowledge and truths. This community is a space marked by welcoming, counseling and treatment of followers, where the physical, psychological and spiritual dimensions are integrated in these practices. As regards the black population health, psychological distress results from their having been uprooted from African black cultures.
NASA Astrophysics Data System (ADS)
Lechner, Kurt
Nella scoperta della Relatività Ristretta l'Elettrodinamica, rappresentando una teoria relativistica per eccellenza, ha giocato un ruolo fondamentale. Il principio di relativit` a einsteiniana, che afferma che tutte le leggi della fisica devono avere la stessa forma in tutti i sistemi di riferimento inerziali, è emerso con forza da questa teoria ed è andato consolidandosi sempre di più, man mano che le nostre conoscenze del mondo microscopico sono diventate più complete: tutte le interazioni fondamentali rispettano infatti tale principio. Il modo più semplice ed elegante per implementarlo — difatti l'unico di un'utilità concreta — è rappresentato dal paradigma della covarianza a vista nell'ambito del calcolo tensoriale. Questo paradigma è stato applicato con successo a tutte le teorie di carattere fondamentale, come le teorie che descrivono le quattro interazioni fondamentali e le più speculative teorie di superstringa, e mantiene la sua piena efficacia anche in teoria quantistica. La nostra esposizione dell'Elettrodinamica classica si baserà dunque a ragione su questo paradigma.
[Twelve years of the Baby-Friendly Hospital Initiative in Brazil].
de Araújo, Maria de Fátima Moura; Schmitz, Bethsáida de Abreu Soares
2007-08-01
To evaluate implementation of the Baby-Friendly Hospital Initiative (BFHI) in Brazil from 1992 to 2004. This retrospective descriptive study of the BFHI in Brazil examined the number of Baby-Friendly Hospitals (BFH) accredited per year from 1992 to 2004, state and regional distribution of the hospitals, the number of municipalities with a BFH, and the number of births at the 294 BFH that were participating in Brazil's universal, public health care system (Serviço Unico de Saúde) in 2004. Data were obtained from the Ministry of Health's Hospital Information System, from state health departments, and from Ministry of Health's reports on breastfeeding. From 1992 to 2004, a total of 312 hospitals were BFH-accredited across 24 of Brazil's 26 states and the Federal District. Of these, one had lost accreditation and 10 had been deactivated by the end of the study period. The regional distribution of the 301 remaining BFH in 2004 was: 139 in the Northeast, 59 in the Southeast, 50 in the South, 37 in the Midwest, and 16 in the North. A sharp drop in the accreditation rate was recorded in certain years: 1997, 2003, and 2004. In 2004, 294 (6.8%) of the 4,347 public hospitals with maternity beds were BFH. Of the 3 346 municipalities that had public hospitals with maternity beds, 205 (6.1%) also had BFH. In 2004, there were 2,227,971 births in public hospitals, of which 565,990 (25.4%) occurred in BFH. The number of BFH in Brazil is relatively small when compared to the number of public hospitals with maternity beds. The decreased accreditation rate and the deactivation of accredited BFH, especially in the latter years of the study, indicate the need for measures that will bolster and grow the BFHI in Brazil.
[Epidemiological analysis of suicide in Brazil from 1980 to 2006].
Lovisi, Giovanni Marcos; Santos, Simone Agadir; Legay, Letícia; Abelha, Lucia; Valencia, Elie
2009-10-01
The objective of this study was to carry out an epidemiological analysis of the suicide rates found in Brazilian regions and state capitals between 1980 and 2006. Data on mortality rates due to suicide were collected from the Departamento de Informática do Sistema Unico de Saúde (Information Technology Department of the Brazilian Public Health System--DATASUS). A total of 158,952 suicide cases were registered between 1980 and 2006, excluding those cases in which the individual was less than 10 years old (n = 68). In the period under study, the total suicide rate in Brazil increased from 4.4 to 5.7 deaths per 100,000 inhabitants (29.5%). Higher average rates were found in the South (9.3) and Central-West (6.1) regions. Men were more likely to commit suicide. The highest suicide rates were found in the 70-years or above age range while the highest increases were found in the 20 to 59 year age bracket. The most dominant social-demographic characteristics of the persons who committed suicide in the period under study were low educational level and singlehood. The most common methods of suicide were hanging, fire arms and poisoning. Although in Brazil the rate increased 29.5% in 26 years, the national rate is still considered to be low when compared to worldwide suicide rates (average of 4.9 per 100,000 inhabitants). Suicide rates in Brazilian regions vary broadly, ranging from 2.7 to 9.3.
LinAir: A multi-element discrete vortex Weissinger aerodynamic prediction method
NASA Technical Reports Server (NTRS)
Durston, Donald A.
1993-01-01
LinAir is a vortex lattice aerodynamic prediction method similar to Weissinger's extended lifting-line theory, except that the circulation around a wing is represented by discrete horseshoe vortices, not a continuous distribution of vorticity. The program calculates subsonic longitudinal and lateral/directional aerodynamic forces and moments for arbitrary aircraft geometries. It was originally written by Dr. Ilan Kroo of Stanford University, and subsequently modified by the author to simplify modeling of complex configurations. The Polhamus leading-edge suction analogy was added by the author to extend the range of applicability of LinAir to low aspect ratio (i.e., fighter-type) configurations. A brief discussion of the theory of LinAir is presented, and details on how to run the program are given along with some comparisons with experimental data to validate the code. Example input and output files are given in the appendices to aid in understanding the program and its use. This version of LinAir runs in the VAX/VMS, Cray UNICOS, and Silicon Graphics Iris workstation environments at the time of this writing.
Iorio, M; Robetti, I; Malavenda, P
1993-12-01
The protection of workers' health is defended by the Italian Constitution, and sees its most extensive application in the work of the INAIL (Istituto Nazionale per l'Assicurazione contro gli Infortuni sul Lavoro-National Institute for Assurance against Work-related Accidents). In the T.U. (Testo Unico-Complete Text of Legislation) 1124/1965, dental injury is compensated with fixed percentages for permanent impairment, depending on whether the prosthesis applied is effectual or otherwise. The INAIL's primary task of assigning the necessary treatment and recovering the claimant's occupational aptitude requires that it meets in full the cost of his dental rehabilitation. In Turin in 1981 a systematic procedure was set up for the provision and monitoring of the dental treatment received by the injured person. Legislation relating to prostheses has further widened the scope of dental treatment. To deal correctly with the legal medicine aspects of dental rehabilitation, the authors illustrate a working procedure which is based on the reading of radiological evidence in order to determine the prior situation, extent of injury, results of the treatment and evaluation of residual permanent injury.
The ASC Sequoia Programming Model
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seager, M
2008-08-06
In the late 1980's and early 1990's, Lawrence Livermore National Laboratory was deeply engrossed in determining the next generation programming model for the Integrated Design Codes (IDC) beyond vectorization for the Cray 1s series of computers. The vector model, developed in mid 1970's first for the CDC 7600 and later extended from stack based vector operation to memory to memory operations for the Cray 1s, lasted approximately 20 years (See Slide 5). The Cray vector era was deemed an extremely long lived era as it allowed vector codes to be developed over time (the Cray 1s were faster in scalarmore » mode than the CDC 7600) with vector unit utilization increasing incrementally over time. The other attributes of the Cray vector era at LLNL were that we developed, supported and maintained the Operating System (LTSS and later NLTSS), communications protocols (LINCS), Compilers (Civic Fortran77 and Model), operating system tools (e.g., batch system, job control scripting, loaders, debuggers, editors, graphics utilities, you name it) and math and highly machine optimized libraries (e.g., SLATEC, and STACKLIB). Although LTSS was adopted by Cray for early system generations, they later developed COS and UNICOS operating systems and environment on their own. In the late 1970s and early 1980s two trends appeared that made the Cray vector programming model (described above including both the hardware and system software aspects) seem potentially dated and slated for major revision. These trends were the appearance of low cost CMOS microprocessors and their attendant, departmental and mini-computers and later workstations and personal computers. With the wide spread adoption of Unix in the early 1980s, it appeared that LLNL (and the other DOE Labs) would be left out of the mainstream of computing without a rapid transition to these 'Killer Micros' and modern OS and tools environments. The other interesting advance in the period is that systems were being developed with multiple 'cores' in them and called Symmetric Multi-Processor or Shared Memory Processor (SMP) systems. The parallel revolution had begun. The Laboratory started a small 'parallel processing project' in 1983 to study the new technology and its application to scientific computing with four people: Tim Axelrod, Pete Eltgroth, Paul Dubois and Mark Seager. Two years later, Eugene Brooks joined the team. This team focused on Unix and 'killer micro' SMPs. Indeed, Eugene Brooks was credited with coming up with the 'Killer Micro' term. After several generations of SMP platforms (e.g., Sequent Balance 8000 with 8 33MHz MC32032s, Allian FX8 with 8 MC68020 and FPGA based Vector Units and finally the BB&N Butterfly with 128 cores), it became apparent to us that the killer micro revolution would indeed take over Crays and that we definitely needed a new programming and systems model. The model developed by Mark Seager and Dale Nielsen focused on both the system aspects (Slide 3) and the code development aspects (Slide 4). Although now succinctly captured in two attached slides, at the time there was tremendous ferment in the research community as to what parallel programming model would emerge, dominate and survive. In addition, we wanted a model that would provide portability between platforms of a single generation but also longevity over multiple--and hopefully--many generations. Only after we developed the 'Livermore Model' and worked it out in considerable detail did it become obvious that what we came up with was the right approach. In a nutshell, the applications programming model of the Livermore Model posited that SMP parallelism would ultimately not scale indefinitely and one would have to bite the bullet and implement MPI parallelism within the Integrated Design Code (IDC). We also had a major emphasis on doing everything in a completely standards based, portable methodology with POSIX/Unix as the target environment. We decided against specialized libraries like STACKLIB for performance, but kept as many general purpose, portable math libraries as were needed by the codes. Third, we assumed that the SMPs in clusters would evolve in time to become more powerful, feature rich and, in particular, offer more cores. Thus, we focused on OpenMP, and POSIX PThreads for programming SMP parallelism. These code porting efforts were lead by Dale Nielsen, A-Division code group leader, and Randy Christensen, B-Division code group leader. Most of the porting effort revolved removing 'Crayisms' in the codes: artifacts of LTSS/NLTSS, Civic compiler extensions beyond Fortran77, IO libraries and dealing with new code control languages (we switched to Perl and later to Python). Adding MPI to the codes was initially problematic and error prone because the programmers used MPI directly and sprinkled the calls throughout the code.« less
Use of comorbidity measures to predict the risk of death in Brazilian in-patients.
Martins, Monica
2010-06-01
To assess the use of comorbidity measures to predict the risk of death in Brazilian in-patients. Data from the Sistema de Informações Hospitalares do Sistema Unico de Saúde (Unified Health System Hospital Information System) were used, which enables only one secondary diagnosis to be recorded. A total of 1,607,697 hospitalizations were selected, all of which occurred in Brazil, between 2003 and 2004, and whose main diagnoses were: ischemic heart disease, congestive cardiac failure, stroke and pneumonia. Charlson Index and Elixhauser comorbidities were the comorbidity measures used. In addition, the simple record of a certain secondary diagnosis was also used. Logistic regression was applied to assess the impact of comorbidity measures on the estimate of risk of death. The baseline model included the following variables: age, sex and main diagnosis. Models to predict death were assessed, based on C-statistic and Hosmer-Lemeshow test. Hospital mortality rate was 10.4% and mean length of stay was 5.7 days. The majority (52%) of hospitalizations occurred among men and mean age was 62.6 years. Of all hospitalizations, 5.4% included a recorded secondary diagnosis, although the odds ratio between death and presence of comorbidity was 1.93. The baseline model showed a discriminatory capacity (C-statistic) of 0.685. The improvement in the models, attributed to the introduction of comorbidity indices, was poor, equivalent to zero when C-statistic with only two digits was considered. Although the introduction of three comorbidity measures in distinct models to predict death improved the predictive capacity of the baseline model, the values obtained are still considered insufficient. The accuracy of this type of measure is influenced by the completeness of the source of information. In this sense, high underreporting of secondary diagnosis, in addition to the well-known lack of space to note down this type of information in the Sistema de Informações Hospitalares, are the main explanatory factors for the results found.
NASA Astrophysics Data System (ADS)
Ezema, F. I.; Ekwealor, A. B. C.; Osuji, R. U.
2006-05-01
Zinc selenide (ZnSe) thin films were deposited on glass substrate using the chemical bath deposition method at room temperature from aqueous solutions of zinc sulphate and sodium selenosulfate in which sodium hydroxide was employed as complexing agents. The `as-deposited' ZnSe thin films are red in color and annealed in oven at 473 K for 1 hour and on a hot plate in open air at 333 K for 5 minutes, affecting the morphological and optical properties. Optical properties such as absorption coefficient a and extinction coefficient k, were determined using the absorbance and transmission measurement from Unico UV-2102 PC spectrophotometer, at normal incidence of light in the wavelength range of 200-1000 nm. The films have transmittance in VIS-NIR regions that range between 26 and 87%. From absorbance and transmittance spectra, the band gap energy determined ranged between 1.60 eV and 1.75 for the `as deposited' samples, and the annealed samples exhibited a band gap shift of 0.15 eV. The high transmittance of the films together with its large band gap made them good materials for selective coatings for solar cells.
Research on large area VUV-sensitive gaseous photomultipliers for cryogenic applications
NASA Astrophysics Data System (ADS)
Coimbra, Artur Emanuel Cardoso
Desde cedo que a comunidade cientifica compreendeu que gases nobres em liquido sao excelentes meios de deteccao de radiacao, combinando a sua elevada densidade, elevado grau de homogeneidade e de elevado rendimento de cintilacao. Para alem destas caracteristicas inerentes, estes tem a potencialidade de fornecer ambos sinais de ionizacao - criando electroes livres - e cintilacao em resposta a interaccao com radiacao ionizante e, tendo em vista a sua aplicacao em experiencias de eventos raros relacionados com fisica de neutrinos ou materia-escura, a capacidade de autoblindagem garante a exclusao de eventos induzidos por radiacao de fundo. O facto de nao absorverem a sua propria luz, emergente dos eventos de cintilacao, permite a expansao deste tipo de detectores ate grandes volumes, sendo que as colaboracoes mais recentes propoem detectores com dezenas de toneladas de xenon em estado liquido. As experiencias actuais que usam gases nobres em estado liquido empregam xenon ou argon numa so fase (estado liquido) ou em dupla-fase (estado liquido + gasoso) e as suas aplicacoes abrangem desde as ja referidas experiencias de procura de eventos raros, passando por imagiologia medica tais como detectores de radiacao gama para PET ou câmaras Compton "3-gamma" em combinacao com PET, passando tambem por aplicacoes de seguranca como sistemas de inspeccao para deteccao de material fissil e, finalmente, em câmaras Compton para aplicacoes de astrofisica. Em ambas as configuracoes a leitura dos sinais de cintilacao e geralmente feita atraves de um grande numero de dispendiosos fotomultiplicadores de vacuo agrupados. A presente tese de doutoramento e dedicada aos fotomultiplicadores gasosos de grande area para aplicacoes criogenicas desenvolvidos no contexto do programa doutoral, tendo em vista a sua eventual aplicacao como um dispositivo complementar aos metodos existentes de deteccao de cintilacao, para aplicacao em futuras experiencias de grande escala. Esta pesquisa foi direccionada tendo em vista o desenvolvimento de eficientes fotomultiplicadores gasosos de grande area, potencialmente mais economicos por unidade de area, baseados em "Thick Gas-Electron Multipliers" (THGEMs). Combinando fotocatodos de alta eficiencia com multiplicadores gasosos de electroes capazes de atingir elevado ganho em carga obteve-se assim um dispositivo com elevada sensibilidade para a deteccao de fotoes unicos, com a possibilidade de discriminacao em posicao com resolucao espacial inferior a um milimetro e com resolucao temporal da ordem de poucos nano segundos. Contrariamente ao que sucede com a tecnologia de vacuo actualmente, com este dispositivo a localizacao em posicao de fotoes em grandes areas e feita num unico dispositivo integrando electronica habitualmente utilizada em experiencias de rastreamento de particulas. Neste trabalho o fotomultiplicador gasoso desenvolvido consiste numa cadeia de THGEMs combinados com um fotocatodo de iodeto de cesio (CsI) sensivel ao ultravioleta enquanto que os testes criogenicos foram realizados na Time Projection Chamber (TPC) de dupla fase de xenon liquido recentemente desenvolvida no Weizmann Institute of Science (WILiX). (Abstract shortened by ProQuest.).
ARCGRAPH SYSTEM - AMES RESEARCH GRAPHICS SYSTEM
NASA Technical Reports Server (NTRS)
Hibbard, E. A.
1994-01-01
Ames Research Graphics System, ARCGRAPH, is a collection of libraries and utilities which assist researchers in generating, manipulating, and visualizing graphical data. In addition, ARCGRAPH defines a metafile format that contains device independent graphical data. This file format is used with various computer graphics manipulation and animation packages at Ames, including SURF (COSMIC Program ARC-12381) and GAS (COSMIC Program ARC-12379). In its full configuration, the ARCGRAPH system consists of a two stage pipeline which may be used to output graphical primitives. Stage one is associated with the graphical primitives (i.e. moves, draws, color, etc.) along with the creation and manipulation of the metafiles. Five distinct data filters make up stage one. They are: 1) PLO which handles all 2D vector primitives, 2) POL which handles all 3D polygonal primitives, 3) RAS which handles all 2D raster primitives, 4) VEC which handles all 3D raster primitives, and 5) PO2 which handles all 2D polygonal primitives. Stage two is associated with the process of displaying graphical primitives on a device. To generate the various graphical primitives, create and reprocess ARCGRAPH metafiles, and access the device drivers in the VDI (Video Device Interface) library, users link their applications to ARCGRAPH's GRAFIX library routines. Both FORTRAN and C language versions of the GRAFIX and VDI libraries exist for enhanced portability within these respective programming environments. The ARCGRAPH libraries were developed on a VAX running VMS. Minor documented modification of various routines, however, allows the system to run on the following computers: Cray X-MP running COS (no C version); Cray 2 running UNICOS; DEC VAX running BSD 4.3 UNIX, or Ultrix; SGI IRIS Turbo running GL2-W3.5 and GL2-W3.6; Convex C1 running UNIX; Amhdahl 5840 running UTS; Alliant FX8 running UNIX; Sun 3/160 running UNIX (no native device driver); Stellar GS1000 running Stellex (no native device driver); and an SGI IRIS 4D running IRIX (no native device driver). Currently with version 7.0 of ARCGRAPH, the VDI library supports the following output devices: A VT100 terminal with a RETRO-GRAPHICS board installed, a VT240 using the Tektronix 4010 emulation capability, an SGI IRIS turbo using the native GL2 library, a Tektronix 4010, a Tektronix 4105, and the Tektronix 4014. ARCGRAPH version 7.0 was developed in 1988.
NASA Astrophysics Data System (ADS)
Plummer, M.; Armour, E. A. G.; Todd, A. C.; Franklin, C. P.; Cooper, J. N.
2009-12-01
We present a program used to calculate intricate three-particle integrals for variational calculations of solutions to the leptonic Schrödinger equation with two nuclear centres in which inter-leptonic distances (electron-electron and positron-electron) are included directly in the trial functions. The program has been used so far in calculations of He-H¯ interactions and positron H 2 scattering, however the precisely defined integrals are applicable to other situations. We include a summary discussion of how the program has been optimized from a 'legacy'-type code to a more modern high-performance code with a performance improvement factor of up to 1000. Program summaryProgram title: tripleint.cc Catalogue identifier: AEEV_v1_0 Program summary URL:http://cpc.cs.qub.ac.uk/summaries/AEEV_v1_0.html Program obtainable from: CPC Program Library, Queen's University, Belfast, N. Ireland Licensing provisions: Standard CPC licence, http://cpc.cs.qub.ac.uk/licence/licence.html No. of lines in distributed program, including test data, etc.: 12 829 No. of bytes in distributed program, including test data, etc.: 91 798 Distribution format: tar.gz Programming language: Fortran 95 (fixed format) Computer: Modern PC (tested on AMD processor) [1], IBM Power5 [2] Cray XT4 [3], similar Operating system: Red Hat Linux [1], IBM AIX [2], UNICOS [3] Has the code been vectorized or parallelized?: Serial (multi-core shared memory may be needed for some large jobs) RAM: Dependent on parameter sizes and option to use intermediate I/O. Estimates for practical use: 0.5-2 GBytes (with intermediate I/O); 1-4 GBytes (all-memory: the preferred option). Classification: 2.4, 2.6, 2.7, 2.9, 16.5, 16.10, 20 Nature of problem: The 'tripleint.cc' code evaluates three-particle integrals needed in certain variational (in particular: Rayleigh-Ritz and generalized-Kohn) matrix elements for solution of the Schrödinger equation with two fixed centres (the solutions may then be used in subsequent dynamic nuclear calculations). Specifically the integrals are defined by Eq. (16) in the main text and contain terms proportional to r×r/r,i≠j,i≠k,j≠k, with r the distance between leptons i and j. The article also briefly describes the performance optimizations used to increase the speed of evaluation of the integrals enough to allow detailed testing and mapping of the effect of varying non-linear parameters in the variational trial functions. Solution method: Each integral is solved using prolate spheroidal coordinates and series expansions (with cut-offs) of the many-lepton expressions. 1-d integrals and sub-integrals are solved analytically by various means (the program automatically chooses the most accurate of the available methods for each set of parameters and function arguments), while two of the three integrations over the prolate spheroidal coordinates ' λ' are carried out numerically. Many similar integrals with identical non-linear variational parameters may be calculated with one call of the code. Restrictions: There are limits to the number of points for the numerical integrations, to the cut-off variable itaumax for the many-lepton series expansions, and to the maximum powers of Slater-like input functions. For runs near the limit of the cut-off variable and with certain small-magnitude values of variational non-linear parameters, the code can require large amounts of memory (an option using some intermediate I/O is included to offset this). Unusual features: In addition to the program, we also present a summary description of the techniques and ideology used to optimize the code, together with accuracy tests and indications of performance improvement. Running time: The test runs take 1-15 minutes on HPCx [2] as indicated in Section 5 of the main text. A practical run with 729 integrals, 40 quadrature points per dimension and itaumax = 8 took 150 minutes on a PC (e.g., [1]): a similar run with 'medium' accuracy, e.g. for parameter optimization (see Section 2 of the main text), with 30 points per dimension and itaumax = 6 took 35 minutes. References:PC: Memory: 2.72 GB, CPU: AMD Opteron 246 dual-core, 2×2 GHz, OS: GNU/Linux, kernel: Linux 2.6.9-34.0.2.ELsmp. HPCx, IBM eServer 575 running IBM AIX, http://www.hpcx.ac.uk/ (visited May 2009). HECToR, CRAY XT4 running UNICOS/lc, http://www.hector.ac.uk/ (visited May 2009).
Teixeira da Silva, Jaime A; Dobránszki, Judit
2018-05-01
Nonostante i cambiamenti in corso nell'ambito delle pubblicazioni scientifiche (STEM - scienza, tecnologia, ingegneria e medicina), è indubbio che i direttori delle riviste restano i più importanti custodi del processo editoriale. In questo articolo vengono analizzati i motivi per cui i direttori delle riviste devono continuare ad attenersi ai principi editoriali fondamentali e a utilizzare le nuove tecnologie digitali solo per dare forza al contenuto, ma non per sostituirlo nella sua qualità. Per raggiungere questo obiettivo, in un'epoca caratterizzata da controlli ed equilibri, i direttori delle riviste devono essere attentamente sorvegliati e ritenuti responsabili tanto quanto gli autori che essi stessi valutano. Qualunque scorciatoia potrebbe avere conseguenze negative e inaspettate per quella rivista che non si attenesse a tali regole, che vedrebbe intaccata la propria reputazione e che dovrebbe faticare per recuperare la fiducia dei propri lettori. Quindi, a rischio di sembrare scontati, è meglio prevenire il danno alla reputazione piuttosto che curarlo. L'unico modo per evitarlo è che i direttori delle riviste si adattino a un crescente movimento sempre più critico, che richiede maggiore trasparenza e responsabilità da parte di chi contribuisce a costruire la base delle conoscenze scientifiche e dalla società, specialmente laddove la ricerca è finanziata pubblicamente.
Hulse, Elspeth; Shihana, Fathima; Buckley, Nicholas A
2016-11-01
In Asia methemoglobinemia (MetHb) is commonly caused through self-poisoning with the pesticide propranil. MetHb can cause hypoxia, coma and death, but usually responds to methylene blue. It is therefore vital to have accurate methods to measure blood MetHb to guide appropriate treatments. The gold standard to measure MetHb utilizes a spectrophotometer, but recent bedside tests have been developed e.g., pulse co-oximeter probe and blood color chart. Nine propanil poisoned patients had data collected from hospitals in Sri Lanka during 2008. Several MetHb readings were taken from each patient from admission up to 50 hours using spectrophotometry (Unico UV-Vis model no. 2800), pulse co-oximetry (Radical-7, Masimo, CA), and color chart. The co-oximeter underestimated the MetHb percentage when compared with spectrophotometry and the color chart, especially when the average MetHb was greater than 20%. The color chart demonstrated acceptable accuracy compared with formal spectrophotometry with the majority of values showing no more than 10% difference. This small cohort highlights the potential for extreme inaccuracy of the Radical-7 co-oximeter, especially with a MetHb greater than 20%. Pulse co-oximeters should be required to be validated for the complete range of MetHb prior to regulatory approval.
POMESH - DIFFRACTION ANALYSIS OF REFLECTOR ANTENNAS
NASA Technical Reports Server (NTRS)
Hodges, R. E.
1994-01-01
POMESH is a computer program capable of predicting the performance of reflector antennas. Both far field pattern and gain calculations are performed using the Physical Optics (PO) approximation of the equivalent surface currents. POMESH is primarily intended for relatively small reflectors. It is useful in situations where the surface is described by irregular data that must be interpolated and for cases where the surface derivatives are not known. This method is flexible and robust and also supports near field calculations. Because of the near field computation ability, this computational engine is quite useful for subreflector computations. The program is constructed in a highly modular form so that it may be readily adapted to perform tasks other than the one that is explicitly described here. Since the computationally intensive portions of the algorithm are simple loops, the program can be easily adapted to take advantage of vector processor and parallel architectures. In POMESH the reflector is represented as a piecewise planar surface comprised of triangular regions known as facets. A uniform physical optics (PO) current is assumed to exist on each triangular facet. Then, the PO integral on a facet is approximated by the product of the PO current value at the center and the area of the triangle. In this way, the PO integral over the reflector surface is reduced to a summation of the contribution from each triangular facet. The source horn, or feed, that illuminates the subreflector is approximated by a linear combination of plane patterns. POMESH contains three polarization pattern definitions for the feed; a linear x-polarized element, linear y-polarized element, and a circular polarized element. If a more general feed pattern is required, it is a simple matter to replace the subroutine that implements the pattern definitions. POMESH obtains information necessary to specify the coordinate systems, location of other data files, and parameters of the desired calculation from a user provided data file. A numerical description of the principle plane patterns of the source horn must also be provided. The program is supplied with an analytically defined parabolic reflector surface. However, it is a simple matter to replace it with a user defined reflector surface. Output is given in the form of a data stream to the terminal; a summary of the parameters used in the computation and some sample results in a file; and a data file of the results of the pattern calculations suitable for plotting. POMESH is written in FORTRAN 77 for execution on CRAY series computers running UNICOS. With minor modifications, it has also been successfully implemented on a Sun4 series computer running SunOS, a DEC VAX series computer running VMS, and an IBM PC series computer running OS/2. It requires 2.5Mb of RAM under SunOS 4.1.1, 2.5Mb of RAM under VMS 5-4.3, and 2.5Mb of RAM under OS/2. The OS/2 version requires the Lahey F77L compiler. The standard distribution medium for this program is one 5.25 inch 360K MS-DOS format diskette. It is also available on a .25 inch streaming magnetic tape cartridge in UNIX tar format and a 9-track 1600 BPI magnetic tape in DEC VAX FILES-11 format. POMESH was developed in 1989 and is a copyrighted work with all copyright vested in NASA. CRAY and UNICOS are registered trademarks of Cray Research, Inc. SunOS and Sun4 are trademarks of Sun Microsystems, Inc. DEC, DEC FILES-11, VAX and VMS are trademarks of Digital Equipment Corporation. IBM PC and OS/2 are registered trademarks of International Business Machines, Inc. UNIX is a registered trademark of Bell Laboratories.
NASADIG - NASA DEVICE INDEPENDENT GRAPHICS LIBRARY (AMDAHL VERSION)
NASA Technical Reports Server (NTRS)
Rogers, J. E.
1994-01-01
The NASA Device Independent Graphics Library, NASADIG, can be used with many computer-based engineering and management applications. The library gives the user the opportunity to translate data into effective graphic displays for presentation. The software offers many features which allow the user flexibility in creating graphics. These include two-dimensional plots, subplot projections in 3D-space, surface contour line plots, and surface contour color-shaded plots. Routines for three-dimensional plotting, wireframe surface plots, surface plots with hidden line removal, and surface contour line plots are provided. Other features include polar and spherical coordinate plotting, world map plotting utilizing either cylindrical equidistant or Lambert equal area projection, plot translation, plot rotation, plot blowup, splines and polynomial interpolation, area blanking control, multiple log/linear axes, legends and text control, curve thickness control, and multiple text fonts (18 regular, 4 bold). NASADIG contains several groups of subroutines. Included are subroutines for plot area and axis definition; text set-up and display; area blanking; line style set-up, interpolation, and plotting; color shading and pattern control; legend, text block, and character control; device initialization; mixed alphabets setting; and other useful functions. The usefulness of many routines is dependent on the prior definition of basic parameters. The program's control structure uses a serial-level construct with each routine restricted for activation at some prescribed level(s) of problem definition. NASADIG provides the following output device drivers: Selanar 100XL, VECTOR Move/Draw ASCII and PostScript files, Tektronix 40xx, 41xx, and 4510 Rasterizer, DEC VT-240 (4014 mode), IBM AT/PC compatible with SmartTerm 240 emulator, HP Lasergrafix Film Recorder, QMS 800/1200, DEC LN03+ Laserprinters, and HP LaserJet (Series III). NASADIG is written in FORTRAN and is available for several platforms. NASADIG 5.7 is available for DEC VAX series computers running VMS 5.0 or later (MSC-21801), Cray X-MP and Y-MP series computers running UNICOS (COS-10049), and Amdahl 5990 mainframe computers running UTS (COS-10050). NASADIG 5.1 is available for UNIX-based operating systems (MSC-22001). The UNIX version has been successfully implemented on Sun4 series computers running SunOS, SGI IRIS computers running IRIX, Hewlett Packard 9000 computers running HP-UX, and Convex computers running Convex OS (MSC-22001). The standard distribution medium for MSC-21801 is a set of two 6250 BPI 9-track magnetic tapes in DEC VAX BACKUP format. It is also available on a set of two TK50 tape cartridges in DEC VAX BACKUP format. The standard distribution medium for COS-10049 and COS-10050 is a 6250 BPI 9-track magnetic tape in UNIX tar format. Other distribution media and formats may be available upon request. The standard distribution medium for MSC-22001 is a .25 inch streaming magnetic tape cartridge (Sun QIC-24) in UNIX tar format. Alternate distribution media and formats are available upon request. With minor modification, the UNIX source code can be ported to other platforms including IBM PC/AT series computers and compatibles. NASADIG is also available bundled with TRASYS, the Thermal Radiation Analysis System (COS-10026, DEC VAX version; COS-10040, CRAY version).
NASADIG - NASA DEVICE INDEPENDENT GRAPHICS LIBRARY (UNIX VERSION)
NASA Technical Reports Server (NTRS)
Rogers, J. E.
1994-01-01
The NASA Device Independent Graphics Library, NASADIG, can be used with many computer-based engineering and management applications. The library gives the user the opportunity to translate data into effective graphic displays for presentation. The software offers many features which allow the user flexibility in creating graphics. These include two-dimensional plots, subplot projections in 3D-space, surface contour line plots, and surface contour color-shaded plots. Routines for three-dimensional plotting, wireframe surface plots, surface plots with hidden line removal, and surface contour line plots are provided. Other features include polar and spherical coordinate plotting, world map plotting utilizing either cylindrical equidistant or Lambert equal area projection, plot translation, plot rotation, plot blowup, splines and polynomial interpolation, area blanking control, multiple log/linear axes, legends and text control, curve thickness control, and multiple text fonts (18 regular, 4 bold). NASADIG contains several groups of subroutines. Included are subroutines for plot area and axis definition; text set-up and display; area blanking; line style set-up, interpolation, and plotting; color shading and pattern control; legend, text block, and character control; device initialization; mixed alphabets setting; and other useful functions. The usefulness of many routines is dependent on the prior definition of basic parameters. The program's control structure uses a serial-level construct with each routine restricted for activation at some prescribed level(s) of problem definition. NASADIG provides the following output device drivers: Selanar 100XL, VECTOR Move/Draw ASCII and PostScript files, Tektronix 40xx, 41xx, and 4510 Rasterizer, DEC VT-240 (4014 mode), IBM AT/PC compatible with SmartTerm 240 emulator, HP Lasergrafix Film Recorder, QMS 800/1200, DEC LN03+ Laserprinters, and HP LaserJet (Series III). NASADIG is written in FORTRAN and is available for several platforms. NASADIG 5.7 is available for DEC VAX series computers running VMS 5.0 or later (MSC-21801), Cray X-MP and Y-MP series computers running UNICOS (COS-10049), and Amdahl 5990 mainframe computers running UTS (COS-10050). NASADIG 5.1 is available for UNIX-based operating systems (MSC-22001). The UNIX version has been successfully implemented on Sun4 series computers running SunOS, SGI IRIS computers running IRIX, Hewlett Packard 9000 computers running HP-UX, and Convex computers running Convex OS (MSC-22001). The standard distribution medium for MSC-21801 is a set of two 6250 BPI 9-track magnetic tapes in DEC VAX BACKUP format. It is also available on a set of two TK50 tape cartridges in DEC VAX BACKUP format. The standard distribution medium for COS-10049 and COS-10050 is a 6250 BPI 9-track magnetic tape in UNIX tar format. Other distribution media and formats may be available upon request. The standard distribution medium for MSC-22001 is a .25 inch streaming magnetic tape cartridge (Sun QIC-24) in UNIX tar format. Alternate distribution media and formats are available upon request. With minor modification, the UNIX source code can be ported to other platforms including IBM PC/AT series computers and compatibles. NASADIG is also available bundled with TRASYS, the Thermal Radiation Analysis System (COS-10026, DEC VAX version; COS-10040, CRAY version).
TFSSRA - THICK FREQUENCY SELECTIVE SURFACE WITH RECTANGULAR APERTURES
NASA Technical Reports Server (NTRS)
Chen, J. C.
1994-01-01
Thick Frequency Selective Surface with Rectangular Apertures (TFSSRA) was developed to calculate the scattering parameters for a thick frequency selective surface with rectangular apertures on a skew grid at oblique angle of incidence. The method of moments is used to transform the integral equation into a matrix equation suitable for evaluation on a digital computer. TFSSRA predicts the reflection and transmission characteristics of a thick frequency selective surface for both TE and TM orthogonal linearly polarized plane waves. A model of a half-space infinite array is used in the analysis. A complete set of basis functions with unknown coefficients is developed for the waveguide region (waveguide modes) and for the free space region (Floquet modes) in order to represent the electromagnetic fields. To ensure the convergence of the solutions, the number of waveguide modes is adjustable. The method of moments is used to compute the unknown mode coefficients. Then, the scattering matrix of the half-space infinite array is calculated. Next, the reference plane of the scattering matrix is moved half a plate thickness in the negative z-direction, and a frequency selective surface of finite thickness is synthesized by positioning two plates of half-thickness back-to-back. The total scattering matrix is obtained by cascading the scattering matrices of the two half-space infinite arrays. TFSSRA is written in FORTRAN 77 with single precision. It has been successfully implemented on a Sun4 series computer running SunOS, an IBM PC compatible running MS-DOS, and a CRAY series computer running UNICOS, and should run on other systems with slight modifications. Double precision is recommended for running on a PC if many modes are used or if high accuracy is required. This package requires the LINPACK math library, which is included. TFSSRA requires 1Mb of RAM for execution. The standard distribution medium for this program is one 5.25 inch 360K MS-DOS format diskette. It is also available on a .25 inch streaming magnetic tape cartridge (Sun QIC-24) in UNIX tar format. This program was developed in 1992 and is a copyrighted work with all copyright vested in NASA.
Continuity and change in human resources policies for health: lessons from Brazil
2011-01-01
Background This paper reports on progress in implementing human resources for health (HRH) policies in Brazil, in the context of the implementation and expansion of the Unified Health System (Sistema Unico de Saúde - SUS). The three main objectives were: i) to reconstruct the chronology of long term HRH change in Brazil, and to identify and discuss the precursors, drivers, and enablers for these changes over a long time period; (ii) to examine how change was achieved by describing facilitators and constraints, and how policies were adapted to deal with the latter; and (iii) to report on the current situation and draw policy implications. Methods A mixed methods approach was used. A literature review was conducted using pre-defined keywords; and stakeholders were contacted and asked to provide relevant information, data and policy reports. Results There are two key features of HRH change which are related to the implementation of SUS which merit attention: the achievement of staffing growth, and the improvement in HRH policy making and management. Staff growth rates across the period have been high enough to exceed population growth rates. As a consequence, the ratio of staff to population has improved. In 1990 the physician ratio per 1000 inhabitants was 1.12. In 2007, it was 1.74. Another critical factor in achieving staffing growth has been HRH policy making capacity and influence within the political establishment. Conclusions Policies have had to adapt to changing circumstances, whilst focusing on sequential improvements aimed at achieving long term goals. The end objectives, of improving care and access to care, have been kept in view. No one Ministry could secure all the resources and impetus for change that has been required, hence the need for inter-ministry, inter-governmental and inter-agency collaboration, and the development of alliances of shared interest. Across the period of thirty years or more, not all initiatives have been equally successful, but a momentum has been maintained. There was no single long term plan or strategy, but in Brazil this has enabled the progress to be adapted and re-oriented as the broader context changed over the years. PMID:21729318
PLOT3D/AMES, GENERIC UNIX VERSION USING DISSPLA (WITH TURB3D)
NASA Technical Reports Server (NTRS)
Buning, P.
1994-01-01
PLOT3D is an interactive graphics program designed to help scientists visualize computational fluid dynamics (CFD) grids and solutions. Today, supercomputers and CFD algorithms can provide scientists with simulations of such highly complex phenomena that obtaining an understanding of the simulations has become a major problem. Tools which help the scientist visualize the simulations can be of tremendous aid. PLOT3D/AMES offers more functions and features, and has been adapted for more types of computers than any other CFD graphics program. Version 3.6b+ is supported for five computers and graphic libraries. Using PLOT3D, CFD physicists can view their computational models from any angle, observing the physics of problems and the quality of solutions. As an aid in designing aircraft, for example, PLOT3D's interactive computer graphics can show vortices, temperature, reverse flow, pressure, and dozens of other characteristics of air flow during flight. As critical areas become obvious, they can easily be studied more closely using a finer grid. PLOT3D is part of a computational fluid dynamics software cycle. First, a program such as 3DGRAPE (ARC-12620) helps the scientist generate computational grids to model an object and its surrounding space. Once the grids have been designed and parameters such as the angle of attack, Mach number, and Reynolds number have been specified, a "flow-solver" program such as INS3D (ARC-11794 or COS-10019) solves the system of equations governing fluid flow, usually on a supercomputer. Grids sometimes have as many as two million points, and the "flow-solver" produces a solution file which contains density, x- y- and z-momentum, and stagnation energy for each grid point. With such a solution file and a grid file containing up to 50 grids as input, PLOT3D can calculate and graphically display any one of 74 functions, including shock waves, surface pressure, velocity vectors, and particle traces. PLOT3D's 74 functions are organized into five groups: 1) Grid Functions for grids, grid-checking, etc.; 2) Scalar Functions for contour or carpet plots of density, pressure, temperature, Mach number, vorticity magnitude, helicity, etc.; 3) Vector Functions for vector plots of velocity, vorticity, momentum, and density gradient, etc.; 4) Particle Trace Functions for rake-like plots of particle flow or vortex lines; and 5) Shock locations based on pressure gradient. TURB3D is a modification of PLOT3D which is used for viewing CFD simulations of incompressible turbulent flow. Input flow data consists of pressure, velocity and vorticity. Typical quantities to plot include local fluctuations in flow quantities and turbulent production terms, plotted in physical or wall units. PLOT3D/TURB3D includes both TURB3D and PLOT3D because the operation of TURB3D is identical to PLOT3D, and there is no additional sample data or printed documentation for TURB3D. Graphical capabilities of PLOT3D version 3.6b+ vary among the implementations available through COSMIC. Customers are encouraged to purchase and carefully review the PLOT3D manual before ordering the program for a specific computer and graphics library. There is only one manual for use with all implementations of PLOT3D, and although this manual generally assumes that the Silicon Graphics Iris implementation is being used, informative comments concerning other implementations appear throughout the text. With all implementations, the visual representation of the object and flow field created by PLOT3D consists of points, lines, and polygons. Points can be represented with dots or symbols, color can be used to denote data values, and perspective is used to show depth. Differences among implementations impact the program's ability to use graphical features that are based on 3D polygons, the user's ability to manipulate the graphical displays, and the user's ability to obtain alternate forms of output. The UNIX/DISSPLA implementation of PLOT3D supports 2-D polygons as well as 2-D and 3-D lines, but does not support graphics features requiring 3-D polygons (shading and hidden line removal, for example). Views can be manipulated using keyboard commands. This version of PLOT3D is potentially able to produce files for a variety of output devices; however, site-specific capabilities will vary depending on the device drivers supplied with the user's DISSPLA library. The version 3.6b+ UNIX/DISSPLA implementations of PLOT3D (ARC-12788) and PLOT3D/TURB3D (ARC-12778) were developed for use on computers running UNIX SYSTEM 5 with BSD 4.3 extensions. The standard distribution media for each ofthese programs is a 9track, 6250 bpi magnetic tape in TAR format. Customers purchasing one implementation version of PLOT3D or PLOT3D/TURB3D will be given a $200 discount on each additional implementation version ordered at the same time. Version 3.6b+ of PLOT3D and PLOT3D/TURB3D are also supported for the following computers and graphics libraries: (1) generic UNIX Supercomputer and IRIS, suitable for CRAY 2/UNICOS, CONVEX, Alliant with remote IRIS 2xxx/3xxx or IRIS 4D (ARC-12779, ARC-12784); (2) Silicon Graphics IRIS 2xxx/3xxx or IRIS 4D (ARC-12783, ARC-12782); (3) VAX computers running VMS Version 5.0 and DISSPLA Version 11.0 (ARC-12777, ARC-12781); and (4) Apollo computers running UNIX and GMR3D Version 2.0 (ARC-12789, ARC-12785 which have no capabilities to put text on plots). Silicon Graphics Iris, IRIS 4D, and IRIS 2xxx/3xxx are trademarks of Silicon Graphics Incorporated. VAX and VMS are trademarks of Digital Electronics Corporation. DISSPLA is a trademark of Computer Associates. CRAY 2 and UNICOS are trademarks of CRAY Research, Incorporated. CONVEX is a trademark of Convex Computer Corporation. Alliant is a trademark of Alliant. Apollo and GMR3D are trademarks of Hewlett-Packard, Incorporated. System 5 is a trademark of Bell Labs, Incorporated. BSD4.3 is a trademark of the University of California at Berkeley. UNIX is a registered trademark of AT&T.
PLOT3D/AMES, GENERIC UNIX VERSION USING DISSPLA (WITHOUT TURB3D)
NASA Technical Reports Server (NTRS)
Buning, P.
1994-01-01
PLOT3D is an interactive graphics program designed to help scientists visualize computational fluid dynamics (CFD) grids and solutions. Today, supercomputers and CFD algorithms can provide scientists with simulations of such highly complex phenomena that obtaining an understanding of the simulations has become a major problem. Tools which help the scientist visualize the simulations can be of tremendous aid. PLOT3D/AMES offers more functions and features, and has been adapted for more types of computers than any other CFD graphics program. Version 3.6b+ is supported for five computers and graphic libraries. Using PLOT3D, CFD physicists can view their computational models from any angle, observing the physics of problems and the quality of solutions. As an aid in designing aircraft, for example, PLOT3D's interactive computer graphics can show vortices, temperature, reverse flow, pressure, and dozens of other characteristics of air flow during flight. As critical areas become obvious, they can easily be studied more closely using a finer grid. PLOT3D is part of a computational fluid dynamics software cycle. First, a program such as 3DGRAPE (ARC-12620) helps the scientist generate computational grids to model an object and its surrounding space. Once the grids have been designed and parameters such as the angle of attack, Mach number, and Reynolds number have been specified, a "flow-solver" program such as INS3D (ARC-11794 or COS-10019) solves the system of equations governing fluid flow, usually on a supercomputer. Grids sometimes have as many as two million points, and the "flow-solver" produces a solution file which contains density, x- y- and z-momentum, and stagnation energy for each grid point. With such a solution file and a grid file containing up to 50 grids as input, PLOT3D can calculate and graphically display any one of 74 functions, including shock waves, surface pressure, velocity vectors, and particle traces. PLOT3D's 74 functions are organized into five groups: 1) Grid Functions for grids, grid-checking, etc.; 2) Scalar Functions for contour or carpet plots of density, pressure, temperature, Mach number, vorticity magnitude, helicity, etc.; 3) Vector Functions for vector plots of velocity, vorticity, momentum, and density gradient, etc.; 4) Particle Trace Functions for rake-like plots of particle flow or vortex lines; and 5) Shock locations based on pressure gradient. TURB3D is a modification of PLOT3D which is used for viewing CFD simulations of incompressible turbulent flow. Input flow data consists of pressure, velocity and vorticity. Typical quantities to plot include local fluctuations in flow quantities and turbulent production terms, plotted in physical or wall units. PLOT3D/TURB3D includes both TURB3D and PLOT3D because the operation of TURB3D is identical to PLOT3D, and there is no additional sample data or printed documentation for TURB3D. Graphical capabilities of PLOT3D version 3.6b+ vary among the implementations available through COSMIC. Customers are encouraged to purchase and carefully review the PLOT3D manual before ordering the program for a specific computer and graphics library. There is only one manual for use with all implementations of PLOT3D, and although this manual generally assumes that the Silicon Graphics Iris implementation is being used, informative comments concerning other implementations appear throughout the text. With all implementations, the visual representation of the object and flow field created by PLOT3D consists of points, lines, and polygons. Points can be represented with dots or symbols, color can be used to denote data values, and perspective is used to show depth. Differences among implementations impact the program's ability to use graphical features that are based on 3D polygons, the user's ability to manipulate the graphical displays, and the user's ability to obtain alternate forms of output. The UNIX/DISSPLA implementation of PLOT3D supports 2-D polygons as well as 2-D and 3-D lines, but does not support graphics features requiring 3-D polygons (shading and hidden line removal, for example). Views can be manipulated using keyboard commands. This version of PLOT3D is potentially able to produce files for a variety of output devices; however, site-specific capabilities will vary depending on the device drivers supplied with the user's DISSPLA library. The version 3.6b+ UNIX/DISSPLA implementations of PLOT3D (ARC-12788) and PLOT3D/TURB3D (ARC-12778) were developed for use on computers running UNIX SYSTEM 5 with BSD 4.3 extensions. The standard distribution media for each ofthese programs is a 9track, 6250 bpi magnetic tape in TAR format. Customers purchasing one implementation version of PLOT3D or PLOT3D/TURB3D will be given a $200 discount on each additional implementation version ordered at the same time. Version 3.6b+ of PLOT3D and PLOT3D/TURB3D are also supported for the following computers and graphics libraries: (1) generic UNIX Supercomputer and IRIS, suitable for CRAY 2/UNICOS, CONVEX, Alliant with remote IRIS 2xxx/3xxx or IRIS 4D (ARC-12779, ARC-12784); (2) Silicon Graphics IRIS 2xxx/3xxx or IRIS 4D (ARC-12783, ARC-12782); (3) VAX computers running VMS Version 5.0 and DISSPLA Version 11.0 (ARC-12777, ARC-12781); and (4) Apollo computers running UNIX and GMR3D Version 2.0 (ARC-12789, ARC-12785 which have no capabilities to put text on plots). Silicon Graphics Iris, IRIS 4D, and IRIS 2xxx/3xxx are trademarks of Silicon Graphics Incorporated. VAX and VMS are trademarks of Digital Electronics Corporation. DISSPLA is a trademark of Computer Associates. CRAY 2 and UNICOS are trademarks of CRAY Research, Incorporated. CONVEX is a trademark of Convex Computer Corporation. Alliant is a trademark of Alliant. Apollo and GMR3D are trademarks of Hewlett-Packard, Incorporated. System 5 is a trademark of Bell Labs, Incorporated. BSD4.3 is a trademark of the University of California at Berkeley. UNIX is a registered trademark of AT&T.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bray, C.J.; Spooner, E.T.C.; Hall, C.M.
Mineralization at McClean occurs in elongate pods at the unconformity between the Athabasca sandstone sequence and the underlying Archean/Aphebian basement. Laser probe /sup 40/Ar//sup 39/Ar and conventional K/Ar dates were obtained on illites from the following environments (i) alteration halo around high grade U(-Ni-Co) mineralization, (ii) recrystallized sedimentary layers within the sandstone sequence, (iii) interstitial to quartz grains in sandstone, and (iv) regolith. The alteration halo illites gave ages between 1321+/-44 and 1002+/-33 Ma (n=20) which are in good agreement with published U-Pb dates on other U deposits in the area. One sample was analyzed twice, and gave a significantmore » age difference of 20 Ma. Hence the age range is interpreted as being either a reflection of variable argon retentivity or due to continued hydrothermal activity (i.e. U mineralization) or a combination of both. Dates obtained on (ii), (iii) and (iv) were 1438-1038 (n=8), 1459-1113 (n=3) and 1482-1262 (n=6) Ma respectively. The older ages are in good agreement with a published Rb-Sr whole rock age of 1470 Ma on tuffaceous sediments from the Athabasca group. The spread to younger ages is interpreted as due to resetting by the hot (approx. 200/sup 0/C) formation water which transported the U, and variable argon retentivity. Diffusion studies on a single sample of illite from the sedimentary sequence indicate a low blocking temperature of about 140/sup 0/C and imply that there have been very low temperatures in the area for the last 1000 Ma.« less
PLOT3D/AMES, APOLLO UNIX VERSION USING GMR3D (WITHOUT TURB3D)
NASA Technical Reports Server (NTRS)
Buning, P.
1994-01-01
PLOT3D is an interactive graphics program designed to help scientists visualize computational fluid dynamics (CFD) grids and solutions. Today, supercomputers and CFD algorithms can provide scientists with simulations of such highly complex phenomena that obtaining an understanding of the simulations has become a major problem. Tools which help the scientist visualize the simulations can be of tremendous aid. PLOT3D/AMES offers more functions and features, and has been adapted for more types of computers than any other CFD graphics program. Version 3.6b+ is supported for five computers and graphic libraries. Using PLOT3D, CFD physicists can view their computational models from any angle, observing the physics of problems and the quality of solutions. As an aid in designing aircraft, for example, PLOT3D's interactive computer graphics can show vortices, temperature, reverse flow, pressure, and dozens of other characteristics of air flow during flight. As critical areas become obvious, they can easily be studied more closely using a finer grid. PLOT3D is part of a computational fluid dynamics software cycle. First, a program such as 3DGRAPE (ARC-12620) helps the scientist generate computational grids to model an object and its surrounding space. Once the grids have been designed and parameters such as the angle of attack, Mach number, and Reynolds number have been specified, a "flow-solver" program such as INS3D (ARC-11794 or COS-10019) solves the system of equations governing fluid flow, usually on a supercomputer. Grids sometimes have as many as two million points, and the "flow-solver" produces a solution file which contains density, x- y- and z-momentum, and stagnation energy for each grid point. With such a solution file and a grid file containing up to 50 grids as input, PLOT3D can calculate and graphically display any one of 74 functions, including shock waves, surface pressure, velocity vectors, and particle traces. PLOT3D's 74 functions are organized into five groups: 1) Grid Functions for grids, grid-checking, etc.; 2) Scalar Functions for contour or carpet plots of density, pressure, temperature, Mach number, vorticity magnitude, helicity, etc.; 3) Vector Functions for vector plots of velocity, vorticity, momentum, and density gradient, etc.; 4) Particle Trace Functions for rake-like plots of particle flow or vortex lines; and 5) Shock locations based on pressure gradient. TURB3D is a modification of PLOT3D which is used for viewing CFD simulations of incompressible turbulent flow. Input flow data consists of pressure, velocity and vorticity. Typical quantities to plot include local fluctuations in flow quantities and turbulent production terms, plotted in physical or wall units. PLOT3D/TURB3D includes both TURB3D and PLOT3D because the operation of TURB3D is identical to PLOT3D, and there is no additional sample data or printed documentation for TURB3D. Graphical capabilities of PLOT3D version 3.6b+ vary among the implementations available through COSMIC. Customers are encouraged to purchase and carefully review the PLOT3D manual before ordering the program for a specific computer and graphics library. There is only one manual for use with all implementations of PLOT3D, and although this manual generally assumes that the Silicon Graphics Iris implementation is being used, informative comments concerning other implementations appear throughout the text. With all implementations, the visual representation of the object and flow field created by PLOT3D consists of points, lines, and polygons. Points can be represented with dots or symbols, color can be used to denote data values, and perspective is used to show depth. Differences among implementations impact the program's ability to use graphical features that are based on 3D polygons, the user's ability to manipulate the graphical displays, and the user's ability to obtain alternate forms of output. The Apollo implementation of PLOT3D uses some of the capabilities of Apollo's 3-dimensional graphics hardware, but does not take advantage of the shading and hidden line/surface removal capabilities of the Apollo DN10000. Although this implementation does not offer a capability for putting text on plots, it does support the use of a mouse to translate, rotate, or zoom in on views. The version 3.6b+ Apollo implementations of PLOT3D (ARC-12789) and PLOT3D/TURB3D (ARC-12785) were developed for use on Apollo computers running UNIX System V with BSD 4.3 extensions and the graphics library GMR3D Version 2.0. The standard distribution media for each of these programs is a 9-track, 6250 bpi magnetic tape in TAR format. Customers purchasing one implementation version of PLOT3D or PLOT3D/TURB3D will be given a $200 discount on each additional implementation version ordered at the same time. Version 3.6b+ of PLOT3D and PLOT3D/TURB3D are also supported for the following computers and graphics libraries: 1) generic UNIX Supercomputer and IRIS, suitable for CRAY 2/UNICOS, CONVEX, and Alliant with remote IRIS 2xxx/3xxx or IRIS 4D (ARC-12779, ARC-12784); 2) VAX computers running VMS Version 5.0 and DISSPLA Version 11.0 (ARC-12777, ARC-12781); 3) generic UNIX and DISSPLA Version 11.0 (ARC-12788, ARC-12778); and (4) Silicon Graphics IRIS 2xxx/3xxx or IRIS 4D workstations (ARC-12783, ARC-12782). Silicon Graphics Iris, IRIS 4D, and IRIS 2xxx/3xxx are trademarks of Silicon Graphics Incorporated. VAX and VMS are trademarks of Digital Electronics Corporation. DISSPLA is a trademark of Computer Associates. CRAY 2 and UNICOS are trademarks of CRAY Research, Incorporated. CONVEX is a trademark of Convex Computer Corporation. Alliant is a trademark of Alliant. Apollo and GMR3D are trademarks of Hewlett-Packard, Incorporated. UNIX is a registered trademark of AT&T.
PLOT3D/AMES, SGI IRIS VERSION (WITHOUT TURB3D)
NASA Technical Reports Server (NTRS)
Buning, P.
1994-01-01
PLOT3D is an interactive graphics program designed to help scientists visualize computational fluid dynamics (CFD) grids and solutions. Today, supercomputers and CFD algorithms can provide scientists with simulations of such highly complex phenomena that obtaining an understanding of the simulations has become a major problem. Tools which help the scientist visualize the simulations can be of tremendous aid. PLOT3D/AMES offers more functions and features, and has been adapted for more types of computers than any other CFD graphics program. Version 3.6b+ is supported for five computers and graphic libraries. Using PLOT3D, CFD physicists can view their computational models from any angle, observing the physics of problems and the quality of solutions. As an aid in designing aircraft, for example, PLOT3D's interactive computer graphics can show vortices, temperature, reverse flow, pressure, and dozens of other characteristics of air flow during flight. As critical areas become obvious, they can easily be studied more closely using a finer grid. PLOT3D is part of a computational fluid dynamics software cycle. First, a program such as 3DGRAPE (ARC-12620) helps the scientist generate computational grids to model an object and its surrounding space. Once the grids have been designed and parameters such as the angle of attack, Mach number, and Reynolds number have been specified, a "flow-solver" program such as INS3D (ARC-11794 or COS-10019) solves the system of equations governing fluid flow, usually on a supercomputer. Grids sometimes have as many as two million points, and the "flow-solver" produces a solution file which contains density, x- y- and z-momentum, and stagnation energy for each grid point. With such a solution file and a grid file containing up to 50 grids as input, PLOT3D can calculate and graphically display any one of 74 functions, including shock waves, surface pressure, velocity vectors, and particle traces. PLOT3D's 74 functions are organized into five groups: 1) Grid Functions for grids, grid-checking, etc.; 2) Scalar Functions for contour or carpet plots of density, pressure, temperature, Mach number, vorticity magnitude, helicity, etc.; 3) Vector Functions for vector plots of velocity, vorticity, momentum, and density gradient, etc.; 4) Particle Trace Functions for rake-like plots of particle flow or vortex lines; and 5) Shock locations based on pressure gradient. TURB3D is a modification of PLOT3D which is used for viewing CFD simulations of incompressible turbulent flow. Input flow data consists of pressure, velocity and vorticity. Typical quantities to plot include local fluctuations in flow quantities and turbulent production terms, plotted in physical or wall units. PLOT3D/TURB3D includes both TURB3D and PLOT3D because the operation of TURB3D is identical to PLOT3D, and there is no additional sample data or printed documentation for TURB3D. Graphical capabilities of PLOT3D version 3.6b+ vary among the implementations available through COSMIC. Customers are encouraged to purchase and carefully review the PLOT3D manual before ordering the program for a specific computer and graphics library. There is only one manual for use with all implementations of PLOT3D, and although this manual generally assumes that the Silicon Graphics Iris implementation is being used, informative comments concerning other implementations appear throughout the text. With all implementations, the visual representation of the object and flow field created by PLOT3D consists of points, lines, and polygons. Points can be represented with dots or symbols, color can be used to denote data values, and perspective is used to show depth. Differences among implementations impact the program's ability to use graphical features that are based on 3D polygons, the user's ability to manipulate the graphical displays, and the user's ability to obtain alternate forms of output. In each of these areas, the IRIS implementation of PLOT3D offers advanced features which aid visualization efforts. Shading and hidden line/surface removal can be used to enhance depth perception and other aspects of the graphical displays. A mouse can be used to translate, rotate, or zoom in on views. Files for several types of output can be produced. Two animation options are even offered: creation of simple animation sequences without the need for other software; and, creation of files for use in GAS (Graphics Animation System, ARC-12379), an IRIS program which offers more complex rendering and animation capabilities and can record images to digital disk, video tape, or 16-mm film. The version 3.6b+ SGI implementations of PLOT3D (ARC-12783) and PLOT3D/TURB3D (ARC-12782) were developed for use on Silicon Graphics IRIS 2xxx/3xxx or IRIS 4D workstations. These programs are each distributed on one .25 inch magnetic tape cartridge in IRIS TAR format. Customers purchasing one implementation version of PLOT3D or PLOT3D/TURB3D will be given a $200 discount on each additional implementation version ordered at the same time. Version 3.6b+ of PLOT3D and PLOT3D/TURB3D are also supported for the following computers and graphics libraries: (1) generic UNIX Supercomputer and IRIS, suitable for CRAY 2/UNICOS, CONVEX, and Alliant with remote IRIS 2xxx/3xxx or IRIS 4D (ARC-12779, ARC-12784); (2) VAX computers running VMS Version 5.0 and DISSPLA Version 11.0 (ARC-12777,ARC-12781); (3) generic UNIX and DISSPLA Version 11.0 (ARC-12788, ARC-12778); and (4) Apollo computers running UNIX and GMR3D Version 2.0 (ARC-12789, ARC-12785 which have no capabilities to put text on plots). Silicon Graphics Iris, IRIS 4D, and IRIS 2xxx/3xxx are trademarks of Silicon Graphics Incorporated. VAX and VMS are trademarks of Digital Electronics Corporation. DISSPLA is a trademark of Computer Associates. CRAY 2 and UNICOS are trademarks of CRAY Research, Incorporated. CONVEX is a trademark of Convex Computer Corporation. Alliant is a trademark of Alliant. Apollo and GMR3D are trademarks of Hewlett-Packard, Incorporated. UNIX is a registered trademark of AT&T.
PLOT3D/AMES, APOLLO UNIX VERSION USING GMR3D (WITH TURB3D)
NASA Technical Reports Server (NTRS)
Buning, P.
1994-01-01
PLOT3D is an interactive graphics program designed to help scientists visualize computational fluid dynamics (CFD) grids and solutions. Today, supercomputers and CFD algorithms can provide scientists with simulations of such highly complex phenomena that obtaining an understanding of the simulations has become a major problem. Tools which help the scientist visualize the simulations can be of tremendous aid. PLOT3D/AMES offers more functions and features, and has been adapted for more types of computers than any other CFD graphics program. Version 3.6b+ is supported for five computers and graphic libraries. Using PLOT3D, CFD physicists can view their computational models from any angle, observing the physics of problems and the quality of solutions. As an aid in designing aircraft, for example, PLOT3D's interactive computer graphics can show vortices, temperature, reverse flow, pressure, and dozens of other characteristics of air flow during flight. As critical areas become obvious, they can easily be studied more closely using a finer grid. PLOT3D is part of a computational fluid dynamics software cycle. First, a program such as 3DGRAPE (ARC-12620) helps the scientist generate computational grids to model an object and its surrounding space. Once the grids have been designed and parameters such as the angle of attack, Mach number, and Reynolds number have been specified, a "flow-solver" program such as INS3D (ARC-11794 or COS-10019) solves the system of equations governing fluid flow, usually on a supercomputer. Grids sometimes have as many as two million points, and the "flow-solver" produces a solution file which contains density, x- y- and z-momentum, and stagnation energy for each grid point. With such a solution file and a grid file containing up to 50 grids as input, PLOT3D can calculate and graphically display any one of 74 functions, including shock waves, surface pressure, velocity vectors, and particle traces. PLOT3D's 74 functions are organized into five groups: 1) Grid Functions for grids, grid-checking, etc.; 2) Scalar Functions for contour or carpet plots of density, pressure, temperature, Mach number, vorticity magnitude, helicity, etc.; 3) Vector Functions for vector plots of velocity, vorticity, momentum, and density gradient, etc.; 4) Particle Trace Functions for rake-like plots of particle flow or vortex lines; and 5) Shock locations based on pressure gradient. TURB3D is a modification of PLOT3D which is used for viewing CFD simulations of incompressible turbulent flow. Input flow data consists of pressure, velocity and vorticity. Typical quantities to plot include local fluctuations in flow quantities and turbulent production terms, plotted in physical or wall units. PLOT3D/TURB3D includes both TURB3D and PLOT3D because the operation of TURB3D is identical to PLOT3D, and there is no additional sample data or printed documentation for TURB3D. Graphical capabilities of PLOT3D version 3.6b+ vary among the implementations available through COSMIC. Customers are encouraged to purchase and carefully review the PLOT3D manual before ordering the program for a specific computer and graphics library. There is only one manual for use with all implementations of PLOT3D, and although this manual generally assumes that the Silicon Graphics Iris implementation is being used, informative comments concerning other implementations appear throughout the text. With all implementations, the visual representation of the object and flow field created by PLOT3D consists of points, lines, and polygons. Points can be represented with dots or symbols, color can be used to denote data values, and perspective is used to show depth. Differences among implementations impact the program's ability to use graphical features that are based on 3D polygons, the user's ability to manipulate the graphical displays, and the user's ability to obtain alternate forms of output. The Apollo implementation of PLOT3D uses some of the capabilities of Apollo's 3-dimensional graphics hardware, but does not take advantage of the shading and hidden line/surface removal capabilities of the Apollo DN10000. Although this implementation does not offer a capability for putting text on plots, it does support the use of a mouse to translate, rotate, or zoom in on views. The version 3.6b+ Apollo implementations of PLOT3D (ARC-12789) and PLOT3D/TURB3D (ARC-12785) were developed for use on Apollo computers running UNIX System V with BSD 4.3 extensions and the graphics library GMR3D Version 2.0. The standard distribution media for each of these programs is a 9-track, 6250 bpi magnetic tape in TAR format. Customers purchasing one implementation version of PLOT3D or PLOT3D/TURB3D will be given a $200 discount on each additional implementation version ordered at the same time. Version 3.6b+ of PLOT3D and PLOT3D/TURB3D are also supported for the following computers and graphics libraries: 1) generic UNIX Supercomputer and IRIS, suitable for CRAY 2/UNICOS, CONVEX, and Alliant with remote IRIS 2xxx/3xxx or IRIS 4D (ARC-12779, ARC-12784); 2) VAX computers running VMS Version 5.0 and DISSPLA Version 11.0 (ARC-12777, ARC-12781); 3) generic UNIX and DISSPLA Version 11.0 (ARC-12788, ARC-12778); and (4) Silicon Graphics IRIS 2xxx/3xxx or IRIS 4D workstations (ARC-12783, ARC-12782). Silicon Graphics Iris, IRIS 4D, and IRIS 2xxx/3xxx are trademarks of Silicon Graphics Incorporated. VAX and VMS are trademarks of Digital Electronics Corporation. DISSPLA is a trademark of Computer Associates. CRAY 2 and UNICOS are trademarks of CRAY Research, Incorporated. CONVEX is a trademark of Convex Computer Corporation. Alliant is a trademark of Alliant. Apollo and GMR3D are trademarks of Hewlett-Packard, Incorporated. UNIX is a registered trademark of AT&T.
PLOT3D/AMES, SGI IRIS VERSION (WITH TURB3D)
NASA Technical Reports Server (NTRS)
Buning, P.
1994-01-01
PLOT3D is an interactive graphics program designed to help scientists visualize computational fluid dynamics (CFD) grids and solutions. Today, supercomputers and CFD algorithms can provide scientists with simulations of such highly complex phenomena that obtaining an understanding of the simulations has become a major problem. Tools which help the scientist visualize the simulations can be of tremendous aid. PLOT3D/AMES offers more functions and features, and has been adapted for more types of computers than any other CFD graphics program. Version 3.6b+ is supported for five computers and graphic libraries. Using PLOT3D, CFD physicists can view their computational models from any angle, observing the physics of problems and the quality of solutions. As an aid in designing aircraft, for example, PLOT3D's interactive computer graphics can show vortices, temperature, reverse flow, pressure, and dozens of other characteristics of air flow during flight. As critical areas become obvious, they can easily be studied more closely using a finer grid. PLOT3D is part of a computational fluid dynamics software cycle. First, a program such as 3DGRAPE (ARC-12620) helps the scientist generate computational grids to model an object and its surrounding space. Once the grids have been designed and parameters such as the angle of attack, Mach number, and Reynolds number have been specified, a "flow-solver" program such as INS3D (ARC-11794 or COS-10019) solves the system of equations governing fluid flow, usually on a supercomputer. Grids sometimes have as many as two million points, and the "flow-solver" produces a solution file which contains density, x- y- and z-momentum, and stagnation energy for each grid point. With such a solution file and a grid file containing up to 50 grids as input, PLOT3D can calculate and graphically display any one of 74 functions, including shock waves, surface pressure, velocity vectors, and particle traces. PLOT3D's 74 functions are organized into five groups: 1) Grid Functions for grids, grid-checking, etc.; 2) Scalar Functions for contour or carpet plots of density, pressure, temperature, Mach number, vorticity magnitude, helicity, etc.; 3) Vector Functions for vector plots of velocity, vorticity, momentum, and density gradient, etc.; 4) Particle Trace Functions for rake-like plots of particle flow or vortex lines; and 5) Shock locations based on pressure gradient. TURB3D is a modification of PLOT3D which is used for viewing CFD simulations of incompressible turbulent flow. Input flow data consists of pressure, velocity and vorticity. Typical quantities to plot include local fluctuations in flow quantities and turbulent production terms, plotted in physical or wall units. PLOT3D/TURB3D includes both TURB3D and PLOT3D because the operation of TURB3D is identical to PLOT3D, and there is no additional sample data or printed documentation for TURB3D. Graphical capabilities of PLOT3D version 3.6b+ vary among the implementations available through COSMIC. Customers are encouraged to purchase and carefully review the PLOT3D manual before ordering the program for a specific computer and graphics library. There is only one manual for use with all implementations of PLOT3D, and although this manual generally assumes that the Silicon Graphics Iris implementation is being used, informative comments concerning other implementations appear throughout the text. With all implementations, the visual representation of the object and flow field created by PLOT3D consists of points, lines, and polygons. Points can be represented with dots or symbols, color can be used to denote data values, and perspective is used to show depth. Differences among implementations impact the program's ability to use graphical features that are based on 3D polygons, the user's ability to manipulate the graphical displays, and the user's ability to obtain alternate forms of output. In each of these areas, the IRIS implementation of PLOT3D offers advanced features which aid visualization efforts. Shading and hidden line/surface removal can be used to enhance depth perception and other aspects of the graphical displays. A mouse can be used to translate, rotate, or zoom in on views. Files for several types of output can be produced. Two animation options are even offered: creation of simple animation sequences without the need for other software; and, creation of files for use in GAS (Graphics Animation System, ARC-12379), an IRIS program which offers more complex rendering and animation capabilities and can record images to digital disk, video tape, or 16-mm film. The version 3.6b+ SGI implementations of PLOT3D (ARC-12783) and PLOT3D/TURB3D (ARC-12782) were developed for use on Silicon Graphics IRIS 2xxx/3xxx or IRIS 4D workstations. These programs are each distributed on one .25 inch magnetic tape cartridge in IRIS TAR format. Customers purchasing one implementation version of PLOT3D or PLOT3D/TURB3D will be given a $200 discount on each additional implementation version ordered at the same time. Version 3.6b+ of PLOT3D and PLOT3D/TURB3D are also supported for the following computers and graphics libraries: (1) generic UNIX Supercomputer and IRIS, suitable for CRAY 2/UNICOS, CONVEX, and Alliant with remote IRIS 2xxx/3xxx or IRIS 4D (ARC-12779, ARC-12784); (2) VAX computers running VMS Version 5.0 and DISSPLA Version 11.0 (ARC-12777,ARC-12781); (3) generic UNIX and DISSPLA Version 11.0 (ARC-12788, ARC-12778); and (4) Apollo computers running UNIX and GMR3D Version 2.0 (ARC-12789, ARC-12785 which have no capabilities to put text on plots). Silicon Graphics Iris, IRIS 4D, and IRIS 2xxx/3xxx are trademarks of Silicon Graphics Incorporated. VAX and VMS are trademarks of Digital Electronics Corporation. DISSPLA is a trademark of Computer Associates. CRAY 2 and UNICOS are trademarks of CRAY Research, Incorporated. CONVEX is a trademark of Convex Computer Corporation. Alliant is a trademark of Alliant. Apollo and GMR3D are trademarks of Hewlett-Packard, Incorporated. UNIX is a registered trademark of AT&T.
PLOT3D/AMES, UNIX SUPERCOMPUTER AND SGI IRIS VERSION (WITHOUT TURB3D)
NASA Technical Reports Server (NTRS)
Buning, P.
1994-01-01
PLOT3D is an interactive graphics program designed to help scientists visualize computational fluid dynamics (CFD) grids and solutions. Today, supercomputers and CFD algorithms can provide scientists with simulations of such highly complex phenomena that obtaining an understanding of the simulations has become a major problem. Tools which help the scientist visualize the simulations can be of tremendous aid. PLOT3D/AMES offers more functions and features, and has been adapted for more types of computers than any other CFD graphics program. Version 3.6b+ is supported for five computers and graphic libraries. Using PLOT3D, CFD physicists can view their computational models from any angle, observing the physics of problems and the quality of solutions. As an aid in designing aircraft, for example, PLOT3D's interactive computer graphics can show vortices, temperature, reverse flow, pressure, and dozens of other characteristics of air flow during flight. As critical areas become obvious, they can easily be studied more closely using a finer grid. PLOT3D is part of a computational fluid dynamics software cycle. First, a program such as 3DGRAPE (ARC-12620) helps the scientist generate computational grids to model an object and its surrounding space. Once the grids have been designed and parameters such as the angle of attack, Mach number, and Reynolds number have been specified, a "flow-solver" program such as INS3D (ARC-11794 or COS-10019) solves the system of equations governing fluid flow, usually on a supercomputer. Grids sometimes have as many as two million points, and the "flow-solver" produces a solution file which contains density, x- y- and z-momentum, and stagnation energy for each grid point. With such a solution file and a grid file containing up to 50 grids as input, PLOT3D can calculate and graphically display any one of 74 functions, including shock waves, surface pressure, velocity vectors, and particle traces. PLOT3D's 74 functions are organized into five groups: 1) Grid Functions for grids, grid-checking, etc.; 2) Scalar Functions for contour or carpet plots of density, pressure, temperature, Mach number, vorticity magnitude, helicity, etc.; 3) Vector Functions for vector plots of velocity, vorticity, momentum, and density gradient, etc.; 4) Particle Trace Functions for rake-like plots of particle flow or vortex lines; and 5) Shock locations based on pressure gradient. TURB3D is a modification of PLOT3D which is used for viewing CFD simulations of incompressible turbulent flow. Input flow data consists of pressure, velocity and vorticity. Typical quantities to plot include local fluctuations in flow quantities and turbulent production terms, plotted in physical or wall units. PLOT3D/TURB3D includes both TURB3D and PLOT3D because the operation of TURB3D is identical to PLOT3D, and there is no additional sample data or printed documentation for TURB3D. Graphical capabilities of PLOT3D version 3.6b+ vary among the implementations available through COSMIC. Customers are encouraged to purchase and carefully review the PLOT3D manual before ordering the program for a specific computer and graphics library. There is only one manual for use with all implementations of PLOT3D, and although this manual generally assumes that the Silicon Graphics Iris implementation is being used, informative comments concerning other implementations appear throughout the text. With all implementations, the visual representation of the object and flow field created by PLOT3D consists of points, lines, and polygons. Points can be represented with dots or symbols, color can be used to denote data values, and perspective is used to show depth. Differences among implementations impact the program's ability to use graphical features that are based on 3D polygons, the user's ability to manipulate the graphical displays, and the user's ability to obtain alternate forms of output. In addition to providing the advantages of performing complex calculations on a supercomputer, the Supercomputer/IRIS implementation of PLOT3D offers advanced 3-D, view manipulation, and animation capabilities. Shading and hidden line/surface removal can be used to enhance depth perception and other aspects of the graphical displays. A mouse can be used to translate, rotate, or zoom in on views. Files for several types of output can be produced. Two animation options are available. Simple animation sequences can be created on the IRIS, or,if an appropriately modified version of ARCGRAPH (ARC-12350) is accesible on the supercomputer, files can be created for use in GAS (Graphics Animation System, ARC-12379), an IRIS program which offers more complex rendering and animation capabilities and options for recording images to digital disk, video tape, or 16-mm film. The version 3.6b+ Supercomputer/IRIS implementations of PLOT3D (ARC-12779) and PLOT3D/TURB3D (ARC-12784) are suitable for use on CRAY 2/UNICOS, CONVEX, and ALLIANT computers with a remote Silicon Graphics IRIS 2xxx/3xxx or IRIS 4D workstation. These programs are distributed on .25 inch magnetic tape cartridges in IRIS TAR format. Customers purchasing one implementation version of PLOT3D or PLOT3D/TURB3D will be given a $200 discount on each additional implementation version ordered at the same time. Version 3.6b+ of PLOT3D and PLOT3D/TURB3D are also supported for the following computers and graphics libraries: (1) Silicon Graphics IRIS 2xxx/3xxx or IRIS 4D workstations (ARC-12783, ARC-12782); (2) VAX computers running VMS Version 5.0 and DISSPLA Version 11.0 (ARC12777, ARC-12781); (3) generic UNIX and DISSPLA Version 11.0 (ARC-12788, ARC-12778); and (4) Apollo computers running UNIX and GMR3D Version 2.0 (ARC-12789, ARC-12785 - which have no capabilities to put text on plots). Silicon Graphics Iris, IRIS 4D, and IRIS 2xxx/3xxx are trademarks of Silicon Graphics Incorporated. VAX and VMS are trademarks of Digital Electronics Corporation. DISSPLA is a trademark of Computer Associates. CRAY 2 and UNICOS are trademarks of CRAY Research, Incorporated. CONVEX is a trademark of Convex Computer Corporation. Alliant is a trademark of Alliant. Apollo, DN10000, and GMR3D are trademarks of Hewlett-Packard, Incorporated. System V is a trademark of Bell Labs, Incorporated. BSD4.3 is a trademark of the University of California at Berkeley. UNIX is a registered trademark of AT&T.
PLOT3D/AMES, UNIX SUPERCOMPUTER AND SGI IRIS VERSION (WITH TURB3D)
NASA Technical Reports Server (NTRS)
Buning, P.
1994-01-01
PLOT3D is an interactive graphics program designed to help scientists visualize computational fluid dynamics (CFD) grids and solutions. Today, supercomputers and CFD algorithms can provide scientists with simulations of such highly complex phenomena that obtaining an understanding of the simulations has become a major problem. Tools which help the scientist visualize the simulations can be of tremendous aid. PLOT3D/AMES offers more functions and features, and has been adapted for more types of computers than any other CFD graphics program. Version 3.6b+ is supported for five computers and graphic libraries. Using PLOT3D, CFD physicists can view their computational models from any angle, observing the physics of problems and the quality of solutions. As an aid in designing aircraft, for example, PLOT3D's interactive computer graphics can show vortices, temperature, reverse flow, pressure, and dozens of other characteristics of air flow during flight. As critical areas become obvious, they can easily be studied more closely using a finer grid. PLOT3D is part of a computational fluid dynamics software cycle. First, a program such as 3DGRAPE (ARC-12620) helps the scientist generate computational grids to model an object and its surrounding space. Once the grids have been designed and parameters such as the angle of attack, Mach number, and Reynolds number have been specified, a "flow-solver" program such as INS3D (ARC-11794 or COS-10019) solves the system of equations governing fluid flow, usually on a supercomputer. Grids sometimes have as many as two million points, and the "flow-solver" produces a solution file which contains density, x- y- and z-momentum, and stagnation energy for each grid point. With such a solution file and a grid file containing up to 50 grids as input, PLOT3D can calculate and graphically display any one of 74 functions, including shock waves, surface pressure, velocity vectors, and particle traces. PLOT3D's 74 functions are organized into five groups: 1) Grid Functions for grids, grid-checking, etc.; 2) Scalar Functions for contour or carpet plots of density, pressure, temperature, Mach number, vorticity magnitude, helicity, etc.; 3) Vector Functions for vector plots of velocity, vorticity, momentum, and density gradient, etc.; 4) Particle Trace Functions for rake-like plots of particle flow or vortex lines; and 5) Shock locations based on pressure gradient. TURB3D is a modification of PLOT3D which is used for viewing CFD simulations of incompressible turbulent flow. Input flow data consists of pressure, velocity and vorticity. Typical quantities to plot include local fluctuations in flow quantities and turbulent production terms, plotted in physical or wall units. PLOT3D/TURB3D includes both TURB3D and PLOT3D because the operation of TURB3D is identical to PLOT3D, and there is no additional sample data or printed documentation for TURB3D. Graphical capabilities of PLOT3D version 3.6b+ vary among the implementations available through COSMIC. Customers are encouraged to purchase and carefully review the PLOT3D manual before ordering the program for a specific computer and graphics library. There is only one manual for use with all implementations of PLOT3D, and although this manual generally assumes that the Silicon Graphics Iris implementation is being used, informative comments concerning other implementations appear throughout the text. With all implementations, the visual representation of the object and flow field created by PLOT3D consists of points, lines, and polygons. Points can be represented with dots or symbols, color can be used to denote data values, and perspective is used to show depth. Differences among implementations impact the program's ability to use graphical features that are based on 3D polygons, the user's ability to manipulate the graphical displays, and the user's ability to obtain alternate forms of output. In addition to providing the advantages of performing complex calculations on a supercomputer, the Supercomputer/IRIS implementation of PLOT3D offers advanced 3-D, view manipulation, and animation capabilities. Shading and hidden line/surface removal can be used to enhance depth perception and other aspects of the graphical displays. A mouse can be used to translate, rotate, or zoom in on views. Files for several types of output can be produced. Two animation options are available. Simple animation sequences can be created on the IRIS, or,if an appropriately modified version of ARCGRAPH (ARC-12350) is accesible on the supercomputer, files can be created for use in GAS (Graphics Animation System, ARC-12379), an IRIS program which offers more complex rendering and animation capabilities and options for recording images to digital disk, video tape, or 16-mm film. The version 3.6b+ Supercomputer/IRIS implementations of PLOT3D (ARC-12779) and PLOT3D/TURB3D (ARC-12784) are suitable for use on CRAY 2/UNICOS, CONVEX, and ALLIANT computers with a remote Silicon Graphics IRIS 2xxx/3xxx or IRIS 4D workstation. These programs are distributed on .25 inch magnetic tape cartridges in IRIS TAR format. Customers purchasing one implementation version of PLOT3D or PLOT3D/TURB3D will be given a $200 discount on each additional implementation version ordered at the same time. Version 3.6b+ of PLOT3D and PLOT3D/TURB3D are also supported for the following computers and graphics libraries: (1) Silicon Graphics IRIS 2xxx/3xxx or IRIS 4D workstations (ARC-12783, ARC-12782); (2) VAX computers running VMS Version 5.0 and DISSPLA Version 11.0 (ARC12777, ARC-12781); (3) generic UNIX and DISSPLA Version 11.0 (ARC-12788, ARC-12778); and (4) Apollo computers running UNIX and GMR3D Version 2.0 (ARC-12789, ARC-12785 - which have no capabilities to put text on plots). Silicon Graphics Iris, IRIS 4D, and IRIS 2xxx/3xxx are trademarks of Silicon Graphics Incorporated. VAX and VMS are trademarks of Digital Electronics Corporation. DISSPLA is a trademark of Computer Associates. CRAY 2 and UNICOS are trademarks of CRAY Research, Incorporated. CONVEX is a trademark of Convex Computer Corporation. Alliant is a trademark of Alliant. Apollo, DN10000, and GMR3D are trademarks of Hewlett-Packard, Incorporated. System V is a trademark of Bell Labs, Incorporated. BSD4.3 is a trademark of the University of California at Berkeley. UNIX is a registered trademark of AT&T.
ERIC Educational Resources Information Center
Sobh, Tarek M.; Tibrewal, Abhilasha
2006-01-01
Operating systems theory primarily concentrates on the optimal use of computing resources. This paper presents an alternative approach to teaching and studying operating systems design and concepts by way of parametrically optimizing critical operating system functions. Detailed examples of two critical operating systems functions using the…
Operational Characteristics of an Accelerator Driven Fissile Solution System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kimpland, Robert Herbert
Operational characteristics represent the set of responses that a nuclear system exhibits during normal operation. Operators rely on this behavior to assess the status of the system and to predict the consequences of off-normal events. These characteristics largely refer to the relationship between power and system operating conditions. The static and dynamic behavior of a chain-reacting system, operating at sufficient power, is primarily governed by reactivity effects. The science of reactor physics has identified and evaluated a number of such effects, including Doppler broadening and shifts in the thermal neutron spectrum. Often these reactivity effects are quantified in the formmore » of feedback coefficients that serve as coupling coefficients relating the neutron population and the physical mechanisms that drive reactivity effects, such as fissile material temperature and density changes. The operational characteristics of such nuclear systems usually manifest themselves when perturbations between system power (neutron population) and system operating conditions arise. Successful operation of such systems requires the establishment of steady equilibrium conditions. However, prior to obtaining the desired equilibrium (steady-state) conditions, an approach from zero-power (startup) must occur. This operational regime may possess certain limiting system conditions that must be maintained to achieve effective startup. Once steady-state is achieved, a key characteristic of this operational regime is the level of stability that the system possesses. Finally, a third operational regime, shutdown, may also possess limiting conditions of operation that must be maintained. This report documents the operational characteristics of a “generic” Accelerator Driven Fissile Solution (ADFS) system during the various operational regimes of startup, steady-state operation, and shutdown. Typical time-dependent behavior for each operational regime will be illustrated, and key system parameters, such as response times, will be quantified. A generalized linear systems analysis of steady-state operations will be performed to evaluate the level of stability of ADFS systems. This information should provide a basic understanding of typical ADFS system operational behavior, and facilitate the development of monitoring procedures and operator aids.« less
1986-07-01
COMPUTER-AIDED OPERATION MANAGEMENT SYSTEM ................. 29 Functions of an Off-Line Computer-Aided Operation Management System Applications of...System Comparisons 85 DISTRIBUTION 5V J. • 0. FIGURES Number Page 1 Hardware Components 21 2 Basic Functions of a Computer-Aided Operation Management System...Plant Visits 26 4 Computer-Aided Operation Management Systems Reviewed for Analysis of Basic Functions 29 5 Progress of Software System Installation and
Cognitive engineering models in space systems
NASA Technical Reports Server (NTRS)
Mitchell, Christine M.
1992-01-01
NASA space systems, including mission operations on the ground and in space, are complex, dynamic, predominantly automated systems in which the human operator is a supervisory controller. The human operator monitors and fine-tunes computer-based control systems and is responsible for ensuring safe and efficient system operation. In such systems, the potential consequences of human mistakes and errors may be very large, and low probability of such events is likely. Thus, models of cognitive functions in complex systems are needed to describe human performance and form the theoretical basis of operator workstation design, including displays, controls, and decision support aids. The operator function model represents normative operator behavior-expected operator activities given current system state. The extension of the theoretical structure of the operator function model and its application to NASA Johnson mission operations and space station applications is discussed.
Operationally Efficient Propulsion System Study (OEPSS) data book. Volume 3: Operations technology
NASA Technical Reports Server (NTRS)
Vilja, John O.
1990-01-01
The study was initiated to identify operational problems and cost drivers for current propulsion systems and to identify technology and design approaches to increase the operational efficiency and reduce operations costs for future propulsion systems. To provide readily usable data for the Advanced Launch System (ALS) program, the results of the OEPSS study were organized into a series of OEPSS Data Books. This volume describes operations technologies that will enhance operational efficiency of propulsion systems. A total of 15 operations technologies were identified that will eliminate or mitigate operations problems described in Volume 2. A recommended development plan is presented for eight promising technologies that will simplify the propulsion system and reduce operational requirements.
High-Performance Computing Systems and Operations | Computational Science |
NREL Systems and Operations High-Performance Computing Systems and Operations NREL operates high-performance computing (HPC) systems dedicated to advancing energy efficiency and renewable energy technologies. Capabilities NREL's HPC capabilities include: High-Performance Computing Systems We operate
DOT National Transportation Integrated Search
1981-10-01
The objectives of the Systems Operation Studies (SOS) for automated guideway transit (AGT) systems are to develop models for the analysis of system operations, to evaluate performance and cost, and to establish guidelines for the design and operation...
49 CFR 234.205 - Operating characteristics of warning system apparatus.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Operating characteristics of warning system... Maintenance Standards § 234.205 Operating characteristics of warning system apparatus. Operating... system shall be maintained in accordance with the limits within which the system is designed to operate. ...
49 CFR 234.205 - Operating characteristics of warning system apparatus.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Operating characteristics of warning system... Maintenance Standards § 234.205 Operating characteristics of warning system apparatus. Operating... system shall be maintained in accordance with the limits within which the system is designed to operate. ...
49 CFR 234.205 - Operating characteristics of warning system apparatus.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Operating characteristics of warning system... Maintenance Standards § 234.205 Operating characteristics of warning system apparatus. Operating... system shall be maintained in accordance with the limits within which the system is designed to operate. ...
NASA Astrophysics Data System (ADS)
Konishi, Hiroo; Takahashi, Choei; Kishibe, Hideto; Sato, Hiromichi
The stable operating power limits of a small scale HVDC system composed of voltage source converters (VSC-HVDC system) are analyzed with a simple model. The VSC-HVDC system could operate where the AC system must be somewhat larger in capacity than the VSC-HVDC system capacity. The stable operating power limits were between one and two times the SCR (short circuit ratio). When the inverter of the VSC-HVDC system was operated with lead reactive (capacitive) power control conditions, the stable operating limits were increased through AC voltage stabilization. When the inverter was a STATCOM operation, it could operate regardless of the SCR but regions within allowable AC voltage variations.
Implementation of NASTRAN on the IBM/370 CMS operating system
NASA Technical Reports Server (NTRS)
Britten, S. S.; Schumacker, B.
1980-01-01
The NASA Structural Analysis (NASTRAN) computer program is operational on the IBM 360/370 series computers. While execution of NASTRAN has been described and implemented under the virtual storage operating systems of the IBM 370 models, the IBM 370/168 computer can also operate in a time-sharing mode under the virtual machine operating system using the Conversational Monitor System (CMS) subset. The changes required to make NASTRAN operational under the CMS operating system are described.
Operator Support System Design forthe Operation of RSG-GAS Research Reactor
NASA Astrophysics Data System (ADS)
Santoso, S.; Situmorang, J.; Bakhri, S.; Subekti, M.; Sunaryo, G. R.
2018-02-01
The components of RSG-GAS main control room are facing the problem of material ageing and technology obsolescence as well, and therefore the need for modernization and refurbishment are essential. The modernization in control room can be applied on the operator support system which bears the function in providing information for assisting the operator in conducting diagnosis and actions. The research purpose is to design an operator support system for RSG-GAS control room. The design was developed based on the operator requirement in conducting task operation scenarios and the reactor operation characteristics. These scenarios include power operation, low power operation and shutdown/scram reactor. The operator support system design is presented in a single computer display which contains structure and support system elements e.g. operation procedure, status of safety related components and operational requirements, operation limit condition of parameters, alarm information, and prognosis function. The prototype was developed using LabView software and consisted of components structure and features of the operator support system. Information of each component in the operator support system need to be completed before it can be applied and integrated in the RSG-GAS main control room.
NASA Astrophysics Data System (ADS)
Startsev, Sergey Ya.
2017-05-01
The paper is devoted to hyperbolic (generally speaking, non-Lagrangian and nonlinear) partial differential systems possessing a full set of differential operators that map any function of one independent variable into a symmetry of the corresponding system. We demonstrate that a system has the above property if and only if this system admits a full set of formal integrals (i.e., differential operators which map symmetries into integrals of the system). As a consequence, such systems possess both direct and inverse Noether operators (in the terminology of a work by B. Fuchssteiner and A.S. Fokas who have used these terms for operators that map cosymmetries into symmetries and perform transformations in the opposite direction). Systems admitting Noether operators are not exhausted by Euler-Lagrange systems and the systems with formal integrals. In particular, a hyperbolic system admits an inverse Noether operator if a differential substitution maps this system into a system possessing an inverse Noether operator.
49 CFR 37.33 - Airport transportation systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... systems operated by public airport operators, which provide designated public transportation and connect.... Public airports which operate fixed route transportation systems are subject to the requirements of this... part. (b) Fixed-route transportation systems operated by public airport operators between the airport...
9 CFR 205.201 - System operator.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false System operator. 205.201 Section 205... Interpretive Opinions § 205.201 System operator. The system operator can be the Secretary of State of a State... system refers to operation by the Secretary of State of a State, but the definition in (c)(11) of...
9 CFR 205.201 - System operator.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false System operator. 205.201 Section 205... Interpretive Opinions § 205.201 System operator. The system operator can be the Secretary of State of a State... system refers to operation by the Secretary of State of a State, but the definition in (c)(11) of...
9 CFR 205.201 - System operator.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false System operator. 205.201 Section 205... Interpretive Opinions § 205.201 System operator. The system operator can be the Secretary of State of a State... system refers to operation by the Secretary of State of a State, but the definition in (c)(11) of...
9 CFR 205.201 - System operator.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false System operator. 205.201 Section 205... Interpretive Opinions § 205.201 System operator. The system operator can be the Secretary of State of a State... system refers to operation by the Secretary of State of a State, but the definition in (c)(11) of...
NASA Technical Reports Server (NTRS)
Mitchell, Christine M.
1990-01-01
The design, implementation, and empirical evaluation of task-analytic models and intelligent aids for operators in the control of complex dynamic systems, specifically aerospace systems, are studied. Three related activities are included: (1) the models of operator decision making in complex and predominantly automated space systems were used and developed; (2) the Operator Function Model (OFM) was used to represent operator activities; and (3) Operator Function Model Expert System (OFMspert), a stand-alone knowledge-based system was developed, that interacts with a human operator in a manner similar to a human assistant in the control of aerospace systems. OFMspert is an architecture for an operator's assistant that uses the OFM as its system and operator knowledge base and a blackboard paradigm of problem solving to dynamically generate expectations about upcoming operator activities and interpreting actual operator actions. An experiment validated the OFMspert's intent inferencing capability and showed that it inferred the intentions of operators in ways comparable to both a human expert and operators themselves. OFMspert was also augmented with control capabilities. An interface allowed the operator to interact with OFMspert, delegating as much or as little control responsibility as the operator chose. With its design based on the OFM, OFMspert's control capabilities were available at multiple levels of abstraction and allowed the operator a great deal of discretion over the amount and level of delegated control. An experiment showed that overall system performance was comparable for teams consisting of two human operators versus a human operator and OFMspert team.
NASA Technical Reports Server (NTRS)
Hill, Randall W., Jr.; Cooper, Lynne P.
1993-01-01
For complex operational systems, help needs to come from the inside out. It is often not realistic to call a help desk for problems that need immediate attention, especially for tasks that put a heavy cognitive load on the system operator. This session addresses the issues associated with providing electronic performance support for operational systems, including situations where the system is already fielded and can only change through evolution rather than revolution. We present a case study based on our experiences in developing the Link Monitor and Control Operator Assistant for NASA's Deep Space Network (DSN). The goals of the Operator Assistant are to improve the operability of the system and increase the efficiency of mission operations.
Automated Instructional Management Systems (AIMS) Version III, Operator's Guide.
ERIC Educational Resources Information Center
New York Inst. of Tech., Old Westbury.
This manual gives the instructions necessary to understand and operate the Automated Instructional Management System (AIMS), utilizing IBM System 360, Model 30/Release 20 Disk Operating System, and the OpScan 100 System Reader and Tape Unit. It covers the AIMS III system initialization, system and operational input, requirements, master response…
49 CFR 1580.5 - Inspection authority.
Code of Federal Regulations, 2010 CFR
2010-10-01
... railroad carrier that operates rolling equipment on track that is part of the general railroad system of... rail operator, whether operating on or off the general railroad system of transportation. (7) Each... railroad system of transportation. (8) Each operator of a rail transit system that is not operating on...
Cohen, Fred; Rogers, Deanna T.; Neagoe, Vicentiu
2008-10-14
A method and/or system and/or apparatus providing deception and/or execution alteration in an information system. In specific embodiments, deceptions and/or protections are provided by intercepting and/or modifying operation of one or more system calls of an operating system.
14 CFR 25.1333 - Instrument systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
.... For systems that operate the instruments required by § 25.1303(b) which are located at each pilot's... operating systems which are independent of the operating systems at other flight crew stations, or other...) Additional instruments, systems, or equipment may not be connected to the operating systems for the required...
14 CFR 25.1333 - Instrument systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
.... For systems that operate the instruments required by § 25.1303(b) which are located at each pilot's... operating systems which are independent of the operating systems at other flight crew stations, or other...) Additional instruments, systems, or equipment may not be connected to the operating systems for the required...
14 CFR 25.1333 - Instrument systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... For systems that operate the instruments required by § 25.1303(b) which are located at each pilot's... operating systems which are independent of the operating systems at other flight crew stations, or other...) Additional instruments, systems, or equipment may not be connected to the operating systems for the required...
14 CFR 25.1333 - Instrument systems.
Code of Federal Regulations, 2013 CFR
2013-01-01
.... For systems that operate the instruments required by § 25.1303(b) which are located at each pilot's... operating systems which are independent of the operating systems at other flight crew stations, or other...) Additional instruments, systems, or equipment may not be connected to the operating systems for the required...
14 CFR 25.1333 - Instrument systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... For systems that operate the instruments required by § 25.1303(b) which are located at each pilot's... operating systems which are independent of the operating systems at other flight crew stations, or other...) Additional instruments, systems, or equipment may not be connected to the operating systems for the required...
Multiple operating system rotation environment moving target defense
DOE Office of Scientific and Technical Information (OSTI.GOV)
Evans, Nathaniel; Thompson, Michael
Systems and methods for providing a multiple operating system rotation environment ("MORE") moving target defense ("MTD") computing system are described. The MORE-MTD system provides enhanced computer system security through a rotation of multiple operating systems. The MORE-MTD system increases attacker uncertainty, increases the cost of attacking the system, reduces the likelihood of an attacker locating a vulnerability, and reduces the exposure time of any located vulnerability. The MORE-MTD environment is effectuated by rotation of the operating systems at a given interval. The rotating operating systems create a consistently changing attack surface for remote attackers.
Influence of System Operation Method on CO2 Emissions of PV/Solar Heat/Cogeneration System
NASA Astrophysics Data System (ADS)
Oke, Shinichiro; Kemmoku, Yoshishige; Takikawa, Hirofumi; Sakakibara, Tateki
A PV/solar heat/cogeneration system is assumed to be installed in a hotel. The system is operated with various operation methods: CO2 minimum operation, fees minimum operation, seasonal operation, daytime operation and heat demand following operation. Of these five operations, the former two are virtual operations that are operated with the dynamic programming method, and the latter three are actual operations. Computer simulation is implemented using hourly data of solar radiation intensity, atmospheric temperature, electric, cooling, heating and hot water supply demands for one year, and the life-cycle CO2 emission and the total cost are calculated for every operations. The calculation results show that the virtual two and the actual three operations reduce the life-cycle CO2 emission by 21% and 13% compared with the conventional system, respectively. In regard to both the CO2 emission and the cost, there is no significant difference between the virtual two operation methods or among actual three operation methods.
Measurement of SIFT operating system overhead
NASA Technical Reports Server (NTRS)
Palumbo, D. L.; Butler, R. W.
1985-01-01
The overhead of the software implemented fault tolerance (SIFT) operating system was measured. Several versions of the operating system evolved. Each version represents different strategies employed to improve the measured performance. Three of these versions are analyzed. The internal data structures of the operating systems are discussed. The overhead of the SIFT operating system was found to be of two types: vote overhead and executive task overhead. Both types of overhead were found to be significant in all versions of the system. Improvements substantially reduced this overhead; even with these improvements, the operating system consumed well over 50% of the available processing time.
Multitasking operating systems for microprocessors
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cramer, T.
1981-01-01
Microprocessors, because of their low cost, low power consumption, and small size, have caused an explosion in the number of innovative computer applications. Although there is a great deal of variation in microprocessor applications software, there is relatively little variation in the operating-system-level software from one application to the next. Nonetheless, operating system software, especially when multitasking is involved, can be very time consuming and expensive to develop. The major microprocessor manufacturers have acknowledged the need for operating systems in microprocessor applications and are now supplying real-time multitasking operating system software that is adaptable to a wide variety of usermore » systems. Use of this existing operating system software will decrease the number of redundant operating system development efforts, thus freeing programmers to work on more creative and productive problems. This paper discusses the basic terminology and concepts involved with multitasking operating systems. It is intended to provide a general understanding of the subject, so that the reader will be prepared to evaluate specific operating system software according to his or her needs. 2 references.« less
Characteristics of Operational Space Weather Forecasting: Observations and Models
NASA Astrophysics Data System (ADS)
Berger, Thomas; Viereck, Rodney; Singer, Howard; Onsager, Terry; Biesecker, Doug; Rutledge, Robert; Hill, Steven; Akmaev, Rashid; Milward, George; Fuller-Rowell, Tim
2015-04-01
In contrast to research observations, models and ground support systems, operational systems are characterized by real-time data streams and run schedules, with redundant backup systems for most elements of the system. We review the characteristics of operational space weather forecasting, concentrating on the key aspects of ground- and space-based observations that feed models of the coupled Sun-Earth system at the NOAA/Space Weather Prediction Center (SWPC). Building on the infrastructure of the National Weather Service, SWPC is working toward a fully operational system based on the GOES weather satellite system (constant real-time operation with back-up satellites), the newly launched DSCOVR satellite at L1 (constant real-time data network with AFSCN backup), and operational models of the heliosphere, magnetosphere, and ionosphere/thermosphere/mesophere systems run on the Weather and Climate Operational Super-computing System (WCOSS), one of the worlds largest and fastest operational computer systems that will be upgraded to a dual 2.5 Pflop system in 2016. We review plans for further operational space weather observing platforms being developed in the context of the Space Weather Operations Research and Mitigation (SWORM) task force in the Office of Science and Technology Policy (OSTP) at the White House. We also review the current operational model developments at SWPC, concentrating on the differences between the research codes and the modified real-time versions that must run with zero fault tolerance on the WCOSS systems. Understanding the characteristics and needs of the operational forecasting community is key to producing research into the coupled Sun-Earth system with maximal societal benefit.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-12
... Pachard Company, Business Critical Systems, Mission Critical Business Software Division, Openvms Operating... Business Software Division, Openvms Operating System Development Group, Including an Employee Operating Out... Company, Business Critical Systems, Mission Critical Business Software Division, OpenVMS Operating System...
Transitioning to Integrated Modular Avionics with a Mission Management System
2000-10-01
software structure, which is based on the use of a of interchangeable processing modules of a limited COTS Real - Time Operating System . number of...open standardised interfaces system hardware or the Real - Time Operating System directly supports the use of COTS components, which implementation, to...System RTOS Real - Time Operating System SMBP System Management Blueprint Interface SMOS System Management to Operating System Interface Figure 2: The ASAAC
Code of Federal Regulations, 2011 CFR
2011-04-01
... designated to operate in a One-Stop delivery system established prior to the enactment of WIA be designated... DESCRIPTION OF THE ONE-STOP SYSTEM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT One-Stop Operators § 662.430 Under what conditions may One-Stop operators designated to operate in a One-Stop delivery system...
Code of Federal Regulations, 2010 CFR
2010-04-01
... designated to operate in a One-Stop delivery system established prior to the enactment of WIA be designated... DESCRIPTION OF THE ONE-STOP SYSTEM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT One-Stop Operators § 662.430 Under what conditions may One-Stop operators designated to operate in a One-Stop delivery system...
A Multiprocessor Operating System Simulator
NASA Technical Reports Server (NTRS)
Johnston, Gary M.; Campbell, Roy H.
1988-01-01
This paper describes a multiprocessor operating system simulator that was developed by the authors in the Fall semester of 1987. The simulator was built in response to the need to provide students with an environment in which to build and test operating system concepts as part of the coursework of a third-year undergraduate operating systems course. Written in C++, the simulator uses the co-routine style task package that is distributed with the AT&T C++ Translator to provide a hierarchy of classes that represents a broad range of operating system software and hardware components. The class hierarchy closely follows that of the 'Choices' family of operating systems for loosely- and tightly-coupled multiprocessors. During an operating system course, these classes are refined and specialized by students in homework assignments to facilitate experimentation with different aspects of operating system design and policy decisions. The current implementation runs on the IBM RT PC under 4.3bsd UNIX.
14 CFR 29.672 - Stability augmentation, automatic, and power-operated systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
... power-operated systems. 29.672 Section 29.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 29.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated system is necessary to show...
14 CFR 29.672 - Stability augmentation, automatic, and power-operated systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
... power-operated systems. 29.672 Section 29.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 29.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated system is necessary to show...
14 CFR 27.672 - Stability augmentation, automatic, and power-operated systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
... power-operated systems. 27.672 Section 27.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 27.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated systems is necessary to show...
14 CFR 29.672 - Stability augmentation, automatic, and power-operated systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
... power-operated systems. 29.672 Section 29.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 29.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated system is necessary to show...
14 CFR 27.672 - Stability augmentation, automatic, and power-operated systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
... power-operated systems. 27.672 Section 27.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 27.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated systems is necessary to show...
14 CFR 29.672 - Stability augmentation, automatic, and power-operated systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
... power-operated systems. 29.672 Section 29.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 29.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated system is necessary to show...
14 CFR 27.672 - Stability augmentation, automatic, and power-operated systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
... power-operated systems. 27.672 Section 27.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 27.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated systems is necessary to show...
14 CFR 27.672 - Stability augmentation, automatic, and power-operated systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
... power-operated systems. 27.672 Section 27.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 27.672 Stability augmentation, automatic, and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated systems is necessary to show...
OFMTutor: An operator function model intelligent tutoring system
NASA Technical Reports Server (NTRS)
Jones, Patricia M.
1989-01-01
The design, implementation, and evaluation of an Operator Function Model intelligent tutoring system (OFMTutor) is presented. OFMTutor is intended to provide intelligent tutoring in the context of complex dynamic systems for which an operator function model (OFM) can be constructed. The human operator's role in such complex, dynamic, and highly automated systems is that of a supervisory controller whose primary responsibilities are routine monitoring and fine-tuning of system parameters and occasional compensation for system abnormalities. The automated systems must support the human operator. One potentially useful form of support is the use of intelligent tutoring systems to teach the operator about the system and how to function within that system. Previous research on intelligent tutoring systems (ITS) is considered. The proposed design for OFMTutor is presented, and an experimental evaluation is described.
Autonomous Operations System: Development and Application
NASA Technical Reports Server (NTRS)
Toro Medina, Jaime A.; Wilkins, Kim N.; Walker, Mark; Stahl, Gerald M.
2016-01-01
Autonomous control systems provides the ability of self-governance beyond the conventional control system. As the complexity of mechanical and electrical systems increases, there develops a natural drive for developing robust control systems to manage complicated operations. By closing the bridge between conventional automated systems to knowledge based self-awareness systems, nominal control of operations can evolve into relying on safe critical mitigation processes to support any off-nominal behavior. Current research and development efforts lead by the Autonomous Propellant Loading (APL) group at NASA Kennedy Space Center aims to improve cryogenic propellant transfer operations by developing an automated control and health monitoring system. As an integrated systems, the center aims to produce an Autonomous Operations System (AOS) capable of integrating health management operations with automated control to produce a fully autonomous system.
NASA Technical Reports Server (NTRS)
Campbell, R. H.; Essick, Ray B.; Johnston, Gary; Kenny, Kevin; Russo, Vince
1987-01-01
Project EOS is studying the problems of building adaptable real-time embedded operating systems for the scientific missions of NASA. Choices (A Class Hierarchical Open Interface for Custom Embedded Systems) is an operating system designed and built by Project EOS to address the following specific issues: the software architecture for adaptable embedded parallel operating systems, the achievement of high-performance and real-time operation, the simplification of interprocess communications, the isolation of operating system mechanisms from one another, and the separation of mechanisms from policy decisions. Choices is written in C++ and runs on a ten processor Encore Multimax. The system is intended for use in constructing specialized computer applications and research on advanced operating system features including fault tolerance and parallelism.
Water Distribution System Operation and Maintenance. A Field Study Training Program. Second Edition.
ERIC Educational Resources Information Center
Kerri, Kenneth D.; And Others
Proper installation, inspection, operation, maintenance, repair and management of water distribution systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide water distribution system operators with the knowledge and skills required to operate and maintain…
Clearing a Path: The 16-Bit Operating System Jungle Offers Confusion, Not Standardization.
ERIC Educational Resources Information Center
Pournelle, Jerry
1984-01-01
Discusses the design and limited uses of the Pascal, MS-DOS, CP/M, and PC-DOS operating systems as standard operating systems for 16-bit microprocessors, especially with the more sophisticated microcomputers currently being developed. Advantages and disadvantages of Unix--a multitasking, multiuser operating system--as a standard operating system…
49 CFR 1544.211 - Use of X-ray systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 9 2012-10-01 2012-10-01 false Use of X-ray systems. 1544.211 Section 1544.211... COMMERCIAL OPERATORS Operations § 1544.211 Use of X-ray systems. (a) TSA authorization required. No aircraft operator may use any X-ray system within the United States or under the aircraft operator's operational...
Comparing Two Tools for Mobile-Device Forensics
2017-09-01
baseline standard. 2.4 Mobile Operating Systems "A mobile operating system is an operating system that is specifically designed to run on mobile devices... run on mobile devices" [7]. There are many different types of mobile operating systems and they are constantly changing, which means an operating...to this is that the security features make forensic analysis more difficult [11]. 2.4.2 iPhone "The iPhone runs an operating system called iOS. It is a
NASA Technical Reports Server (NTRS)
Brandli, A. E.; Eckelkamp, R. E.; Kelly, C. M.; Mccandless, W.; Rue, D. L.
1990-01-01
The objective of an operations management system is to provide an orderly and efficient method to operate and maintain aerospace vehicles. Concepts are described for an operations management system and the key technologies are highlighted which will be required if this capability is brought to fruition. Without this automation and decision aiding capability, the growing complexity of avionics will result in an unmanageable workload for the operator, ultimately threatening mission success or survivability of the aircraft or space system. The key technologies include expert system application to operational tasks such as replanning, equipment diagnostics and checkout, global system management, and advanced man machine interfaces. The economical development of operations management systems, which are largely software, will require advancements in other technological areas such as software engineering and computer hardware.
Code of Federal Regulations, 2010 CFR
2010-04-01
... laboratory operations associated with the production and process control system? 111.110 Section 111.110 Food... OPERATIONS FOR DIETARY SUPPLEMENTS Production and Process Control System: Requirements for Quality Control... production and process control system? Quality control operations for laboratory operations associated with...
49 CFR 325.37 - Location and operation of sound level measurement system; highway operations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... system; highway operations. 325.37 Section 325.37 Transportation Other Regulations Relating to...; Highway Operations § 325.37 Location and operation of sound level measurement system; highway operations..., the holder must orient himself/herself relative to the highway in a manner consistent with the...
49 CFR 325.37 - Location and operation of sound level measurement system; highway operations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... system; highway operations. 325.37 Section 325.37 Transportation Other Regulations Relating to...; Highway Operations § 325.37 Location and operation of sound level measurement system; highway operations..., the holder must orient himself/herself relative to the highway in a manner consistent with the...
49 CFR 325.37 - Location and operation of sound level measurement system; highway operations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... system; highway operations. 325.37 Section 325.37 Transportation Other Regulations Relating to...; Highway Operations § 325.37 Location and operation of sound level measurement system; highway operations..., the holder must orient himself/herself relative to the highway in a manner consistent with the...
14 CFR 25.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.961 Fuel system hot weather operation. (a) The fuel system must perform satisfactorily in hot weather operation. This... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system hot weather operation. 25.961...
14 CFR 25.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.961 Fuel system hot weather operation. (a) The fuel system must perform satisfactorily in hot weather operation. This... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel system hot weather operation. 25.961...
14 CFR 25.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.961 Fuel system hot weather operation. (a) The fuel system must perform satisfactorily in hot weather operation. This... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fuel system hot weather operation. 25.961...
14 CFR 25.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.961 Fuel system hot weather operation. (a) The fuel system must perform satisfactorily in hot weather operation. This... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Fuel system hot weather operation. 25.961...
14 CFR 25.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Powerplant Fuel System § 25.961 Fuel system hot weather operation. (a) The fuel system must perform satisfactorily in hot weather operation. This... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel system hot weather operation. 25.961...
46 CFR 113.35-13 - Mechanical engine order telegraph systems; operation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 46 Shipping 4 2014-10-01 2014-10-01 false Mechanical engine order telegraph systems; operation...) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Engine Order Telegraph Systems § 113.35-13 Mechanical engine order telegraph systems; operation. If more than one transmitter operates a...
46 CFR 113.35-13 - Mechanical engine order telegraph systems; operation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 46 Shipping 4 2012-10-01 2012-10-01 false Mechanical engine order telegraph systems; operation...) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Engine Order Telegraph Systems § 113.35-13 Mechanical engine order telegraph systems; operation. If more than one transmitter operates a...
46 CFR 113.35-13 - Mechanical engine order telegraph systems; operation.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 46 Shipping 4 2011-10-01 2011-10-01 false Mechanical engine order telegraph systems; operation...) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Engine Order Telegraph Systems § 113.35-13 Mechanical engine order telegraph systems; operation. If more than one transmitter operates a...
46 CFR 113.35-13 - Mechanical engine order telegraph systems; operation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 46 Shipping 4 2013-10-01 2013-10-01 false Mechanical engine order telegraph systems; operation...) ELECTRICAL ENGINEERING COMMUNICATION AND ALARM SYSTEMS AND EQUIPMENT Engine Order Telegraph Systems § 113.35-13 Mechanical engine order telegraph systems; operation. If more than one transmitter operates a...
14 CFR 25.672 - Stability augmentation and automatic and power-operated systems.
Code of Federal Regulations, 2013 CFR
2013-01-01
... power-operated systems. 25.672 Section 25.672 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... Construction Control Systems § 25.672 Stability augmentation and automatic and power-operated systems. If the functioning of stability augmentation or other automatic or power-operated systems is necessary to show...
NASA Technical Reports Server (NTRS)
Ziese, James M.
1992-01-01
A design tool of figure of merit was developed that allows the operability of a propulsion system design to be measured. This Launch Operations Index (LOI) relates Operations Efficiency to System Complexity. The figure of Merit can be used by conceptual designers to compare different propulsion system designs based on their impact on launch operations. The LOI will improve the design process by making sure direct launch operations experience is a necessary feedback to the design process.
PLOT3D/AMES, DEC VAX VMS VERSION USING DISSPLA (WITHOUT TURB3D)
NASA Technical Reports Server (NTRS)
Buning, P. G.
1994-01-01
PLOT3D is an interactive graphics program designed to help scientists visualize computational fluid dynamics (CFD) grids and solutions. Today, supercomputers and CFD algorithms can provide scientists with simulations of such highly complex phenomena that obtaining an understanding of the simulations has become a major problem. Tools which help the scientist visualize the simulations can be of tremendous aid. PLOT3D/AMES offers more functions and features, and has been adapted for more types of computers than any other CFD graphics program. Version 3.6b+ is supported for five computers and graphic libraries. Using PLOT3D, CFD physicists can view their computational models from any angle, observing the physics of problems and the quality of solutions. As an aid in designing aircraft, for example, PLOT3D's interactive computer graphics can show vortices, temperature, reverse flow, pressure, and dozens of other characteristics of air flow during flight. As critical areas become obvious, they can easily be studied more closely using a finer grid. PLOT3D is part of a computational fluid dynamics software cycle. First, a program such as 3DGRAPE (ARC-12620) helps the scientist generate computational grids to model an object and its surrounding space. Once the grids have been designed and parameters such as the angle of attack, Mach number, and Reynolds number have been specified, a "flow-solver" program such as INS3D (ARC-11794 or COS-10019) solves the system of equations governing fluid flow, usually on a supercomputer. Grids sometimes have as many as two million points, and the "flow-solver" produces a solution file which contains density, x- y- and z-momentum, and stagnation energy for each grid point. With such a solution file and a grid file containing up to 50 grids as input, PLOT3D can calculate and graphically display any one of 74 functions, including shock waves, surface pressure, velocity vectors, and particle traces. PLOT3D's 74 functions are organized into five groups: 1) Grid Functions for grids, grid-checking, etc.; 2) Scalar Functions for contour or carpet plots of density, pressure, temperature, Mach number, vorticity magnitude, helicity, etc.; 3) Vector Functions for vector plots of velocity, vorticity, momentum, and density gradient, etc.; 4) Particle Trace Functions for rake-like plots of particle flow or vortex lines; and 5) Shock locations based on pressure gradient. TURB3D is a modification of PLOT3D which is used for viewing CFD simulations of incompressible turbulent flow. Input flow data consists of pressure, velocity and vorticity. Typical quantities to plot include local fluctuations in flow quantities and turbulent production terms, plotted in physical or wall units. PLOT3D/TURB3D includes both TURB3D and PLOT3D because the operation of TURB3D is identical to PLOT3D, and there is no additional sample data or printed documentation for TURB3D. Graphical capabilities of PLOT3D version 3.6b+ vary among the implementations available through COSMIC. Customers are encouraged to purchase and carefully review the PLOT3D manual before ordering the program for a specific computer and graphics library. There is only one manual for use with all implementations of PLOT3D, and although this manual generally assumes that the Silicon Graphics Iris implementation is being used, informative comments concerning other implementations appear throughout the text. With all implementations, the visual representation of the object and flow field created by PLOT3D consists of points, lines, and polygons. Points can be represented with dots or symbols, color can be used to denote data values, and perspective is used to show depth. Differences among implementations impact the program's ability to use graphical features that are based on 3D polygons, the user's ability to manipulate the graphical displays, and the user's ability to obtain alternate forms of output. The VAX/VMS/DISSPLA implementation of PLOT3D supports 2-D polygons as well as 2-D and 3-D lines, but does not support graphics features requiring 3-D polygons (shading and hidden line removal, for example). Views can be manipulated using keyboard commands. This version of PLOT3D is potentially able to produce files for a variety of output devices; however, site-specific capabilities will vary depending on the device drivers supplied with the user's DISSPLA library. If ARCGRAPH (ARC-12350) is installed on the user's VAX, the VMS/DISSPLA version of PLOT3D can also be used to create files for use in GAS (Graphics Animation System, ARC-12379), an IRIS program capable of animating and recording images on film. The version 3.6b+ VMS/DISSPLA implementations of PLOT3D (ARC-12777) and PLOT3D/TURB3D (ARC-12781) were developed for use on VAX computers running VMS Version 5.0 and DISSPLA Version 11.0. The standard distribution media for each of these programs is a 9-track, 6250 bpi magnetic tape in DEC VAX BACKUP format. Customers purchasing one implementation version of PLOT3D or PLOT3D/TURB3D will be given a $200 discount on each additional implementation version ordered at the same time. Version 3.6b+ of PLOT3D and PLOT3D/TURB3D are also supported for the following computers and graphics libraries: (1) generic UNIX Supercomputer and IRIS, suitable for CRAY 2/UNICOS, CONVEX, and Alliant with remote IRIS 2xxx/3xxx or IRIS 4D (ARC-12779, ARC-12784); (2) Silicon Graphics IRIS 2xxx/3xxx or IRIS 4D (ARC-12783, ARC12782); (3) generic UNIX and DISSPLA Version 11.0 (ARC-12788, ARC-12778); and (4) Apollo computers running UNIX and GMR3D Version 2.0 (ARC-12789, ARC-12785 which have no capabilities to put text on plots). Silicon Graphics Iris, IRIS 4D, and IRIS 2xxx/3xxx are trademarks of Silicon Graphics Incorporated. VAX and VMS are trademarks of Digital Electronics Corporation. DISSPLA is a trademark of Computer Associates. CRAY 2 and UNICOS are trademarks of CRAY Research, Incorporated. CONVEX is a trademark of Convex Computer Corporation. Alliant is a trademark of Alliant. Apollo and GMR3D are trademarks of Hewlett-Packard, Incorporated. UNIX is a registered trademark of AT&T.
PLOT3D/AMES, DEC VAX VMS VERSION USING DISSPLA (WITH TURB3D)
NASA Technical Reports Server (NTRS)
Buning, P.
1994-01-01
PLOT3D is an interactive graphics program designed to help scientists visualize computational fluid dynamics (CFD) grids and solutions. Today, supercomputers and CFD algorithms can provide scientists with simulations of such highly complex phenomena that obtaining an understanding of the simulations has become a major problem. Tools which help the scientist visualize the simulations can be of tremendous aid. PLOT3D/AMES offers more functions and features, and has been adapted for more types of computers than any other CFD graphics program. Version 3.6b+ is supported for five computers and graphic libraries. Using PLOT3D, CFD physicists can view their computational models from any angle, observing the physics of problems and the quality of solutions. As an aid in designing aircraft, for example, PLOT3D's interactive computer graphics can show vortices, temperature, reverse flow, pressure, and dozens of other characteristics of air flow during flight. As critical areas become obvious, they can easily be studied more closely using a finer grid. PLOT3D is part of a computational fluid dynamics software cycle. First, a program such as 3DGRAPE (ARC-12620) helps the scientist generate computational grids to model an object and its surrounding space. Once the grids have been designed and parameters such as the angle of attack, Mach number, and Reynolds number have been specified, a "flow-solver" program such as INS3D (ARC-11794 or COS-10019) solves the system of equations governing fluid flow, usually on a supercomputer. Grids sometimes have as many as two million points, and the "flow-solver" produces a solution file which contains density, x- y- and z-momentum, and stagnation energy for each grid point. With such a solution file and a grid file containing up to 50 grids as input, PLOT3D can calculate and graphically display any one of 74 functions, including shock waves, surface pressure, velocity vectors, and particle traces. PLOT3D's 74 functions are organized into five groups: 1) Grid Functions for grids, grid-checking, etc.; 2) Scalar Functions for contour or carpet plots of density, pressure, temperature, Mach number, vorticity magnitude, helicity, etc.; 3) Vector Functions for vector plots of velocity, vorticity, momentum, and density gradient, etc.; 4) Particle Trace Functions for rake-like plots of particle flow or vortex lines; and 5) Shock locations based on pressure gradient. TURB3D is a modification of PLOT3D which is used for viewing CFD simulations of incompressible turbulent flow. Input flow data consists of pressure, velocity and vorticity. Typical quantities to plot include local fluctuations in flow quantities and turbulent production terms, plotted in physical or wall units. PLOT3D/TURB3D includes both TURB3D and PLOT3D because the operation of TURB3D is identical to PLOT3D, and there is no additional sample data or printed documentation for TURB3D. Graphical capabilities of PLOT3D version 3.6b+ vary among the implementations available through COSMIC. Customers are encouraged to purchase and carefully review the PLOT3D manual before ordering the program for a specific computer and graphics library. There is only one manual for use with all implementations of PLOT3D, and although this manual generally assumes that the Silicon Graphics Iris implementation is being used, informative comments concerning other implementations appear throughout the text. With all implementations, the visual representation of the object and flow field created by PLOT3D consists of points, lines, and polygons. Points can be represented with dots or symbols, color can be used to denote data values, and perspective is used to show depth. Differences among implementations impact the program's ability to use graphical features that are based on 3D polygons, the user's ability to manipulate the graphical displays, and the user's ability to obtain alternate forms of output. The VAX/VMS/DISSPLA implementation of PLOT3D supports 2-D polygons as well as 2-D and 3-D lines, but does not support graphics features requiring 3-D polygons (shading and hidden line removal, for example). Views can be manipulated using keyboard commands. This version of PLOT3D is potentially able to produce files for a variety of output devices; however, site-specific capabilities will vary depending on the device drivers supplied with the user's DISSPLA library. If ARCGRAPH (ARC-12350) is installed on the user's VAX, the VMS/DISSPLA version of PLOT3D can also be used to create files for use in GAS (Graphics Animation System, ARC-12379), an IRIS program capable of animating and recording images on film. The version 3.6b+ VMS/DISSPLA implementations of PLOT3D (ARC-12777) and PLOT3D/TURB3D (ARC-12781) were developed for use on VAX computers running VMS Version 5.0 and DISSPLA Version 11.0. The standard distribution media for each of these programs is a 9-track, 6250 bpi magnetic tape in DEC VAX BACKUP format. Customers purchasing one implementation version of PLOT3D or PLOT3D/TURB3D will be given a $200 discount on each additional implementation version ordered at the same time. Version 3.6b+ of PLOT3D and PLOT3D/TURB3D are also supported for the following computers and graphics libraries: (1) generic UNIX Supercomputer and IRIS, suitable for CRAY 2/UNICOS, CONVEX, and Alliant with remote IRIS 2xxx/3xxx or IRIS 4D (ARC-12779, ARC-12784); (2) Silicon Graphics IRIS 2xxx/3xxx or IRIS 4D (ARC-12783, ARC12782); (3) generic UNIX and DISSPLA Version 11.0 (ARC-12788, ARC-12778); and (4) Apollo computers running UNIX and GMR3D Version 2.0 (ARC-12789, ARC-12785 which have no capabilities to put text on plots). Silicon Graphics Iris, IRIS 4D, and IRIS 2xxx/3xxx are trademarks of Silicon Graphics Incorporated. VAX and VMS are trademarks of Digital Electronics Corporation. DISSPLA is a trademark of Computer Associates. CRAY 2 and UNICOS are trademarks of CRAY Research, Incorporated. CONVEX is a trademark of Convex Computer Corporation. Alliant is a trademark of Alliant. Apollo and GMR3D are trademarks of Hewlett-Packard, Incorporated. UNIX is a registered trademark of AT&T.
From Operating-System Correctness to Pervasively Verified Applications
NASA Astrophysics Data System (ADS)
Daum, Matthias; Schirmer, Norbert W.; Schmidt, Mareike
Though program verification is known and has been used for decades, the verification of a complete computer system still remains a grand challenge. Part of this challenge is the interaction of application programs with the operating system, which is usually entrusted with retrieving input data from and transferring output data to peripheral devices. In this scenario, the correct operation of the applications inherently relies on operating-system correctness. Based on the formal correctness of our real-time operating system Olos, this paper describes an approach to pervasively verify applications running on top of the operating system.
Use of artificial intelligence in supervisory control
NASA Technical Reports Server (NTRS)
Cohen, Aaron; Erickson, Jon D.
1989-01-01
Viewgraphs describing the design and testing of an intelligent decision support system called OFMspert are presented. In this expert system, knowledge about the human operator is represented through an operator/system model referred to as the OFM (Operator Function Model). OFMspert uses the blackboard model of problem solving to maintain a dynamic representation of operator goals, plans, tasks, and actions given previous operator actions and current system state. Results of an experiment to assess OFMspert's intent inferencing capability are outlined. Finally, the overall design philosophy for an intelligent tutoring system (OFMTutor) for operators of complex dynamic systems is summarized.
Making adaptable systems work for mission operations: A case study
NASA Technical Reports Server (NTRS)
Holder, Barbara E.; Levesque, Michael E.
1993-01-01
The Advanced Multimission Operations System (AMMOS) at NASA's Jet Propulsion Laboratory is based on a highly adaptable multimission ground data system (MGDS) for mission operations. The goal for MGDS is to support current flight project science and engineering personnel and to meet the demands of future missions while reducing associated operations and software development costs. MGDS has become a powerful and flexible mission operations system by using a network of heterogeneous workstations, emerging open system standards, and selecting an adaptable tools-based architecture. Challenges in developing adaptable systems for mission operations and the benefits of this approach are described.
Small Water System Operations and Maintenance. A Field Study Training Program. Second Edition.
ERIC Educational Resources Information Center
Kerri, Kenneth D.; And Others
Proper installation, inspection, operation, maintenance, repair and management of small water systems have a significant impact on the operation and maintenance cost and effectiveness of the systems. The objective of this manual is to provide small water system operators with the knowledge and skills required to operate and maintain these systems…
49 CFR 192.621 - Maximum allowable operating pressure: High-pressure distribution systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... STANDARDS Operations § 192.621 Maximum allowable operating pressure: High-pressure distribution systems. (a) No person may operate a segment of a high pressure distribution system at a pressure that exceeds the... segment of a distribution system otherwise designed to operate at over 60 p.s.i. (414 kPa) gage, unless...
Code of Federal Regulations, 2014 CFR
2014-07-01
... capture system and add-on control device operating limits during the performance test? 63.3556 Section 63... system and add-on control device operating limits during the performance test? During the performance... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure...
49 CFR 192.621 - Maximum allowable operating pressure: High-pressure distribution systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... STANDARDS Operations § 192.621 Maximum allowable operating pressure: High-pressure distribution systems. (a) No person may operate a segment of a high pressure distribution system at a pressure that exceeds the... segment of a distribution system otherwise designed to operate at over 60 p.s.i. (414 kPa) gage, unless...
14 CFR 27.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Systems § 27.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Power boost and power-operated control...
14 CFR 29.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Systems § 29.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Power boost and power-operated control...
Code of Federal Regulations, 2013 CFR
2013-07-01
... system and add-on control device operating limits during the performance test? 63.3546 Section 63.3546... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure... minimum operating limit for that specific capture device or system of multiple capture devices. The...
Code of Federal Regulations, 2014 CFR
2014-07-01
... capture system and add-on control device operating limits during the performance test? 63.3546 Section 63... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure... minimum operating limit for that specific capture device or system of multiple capture devices. The...
49 CFR 192.621 - Maximum allowable operating pressure: High-pressure distribution systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... STANDARDS Operations § 192.621 Maximum allowable operating pressure: High-pressure distribution systems. (a) No person may operate a segment of a high pressure distribution system at a pressure that exceeds the... segment of a distribution system otherwise designed to operate at over 60 p.s.i. (414 kPa) gage, unless...
49 CFR 192.621 - Maximum allowable operating pressure: High-pressure distribution systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... STANDARDS Operations § 192.621 Maximum allowable operating pressure: High-pressure distribution systems. (a) No person may operate a segment of a high pressure distribution system at a pressure that exceeds the... segment of a distribution system otherwise designed to operate at over 60 p.s.i. (414 kPa) gage, unless...
14 CFR 29.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2014 CFR
2014-01-01
... Systems § 29.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Power boost and power-operated control...
14 CFR 27.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Systems § 27.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Power boost and power-operated control...
Code of Federal Regulations, 2012 CFR
2012-07-01
... capture system and add-on control device operating limits during the performance test? 63.3546 Section 63... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure... minimum operating limit for that specific capture device or system of multiple capture devices. The...
14 CFR 29.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Systems § 29.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Power boost and power-operated control...
14 CFR 29.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Systems § 29.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Power boost and power-operated control...
Code of Federal Regulations, 2012 CFR
2012-07-01
... capture system and add-on control device operating limits during the performance test? 63.3556 Section 63... system and add-on control device operating limits during the performance test? During the performance... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure...
49 CFR 192.621 - Maximum allowable operating pressure: High-pressure distribution systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... STANDARDS Operations § 192.621 Maximum allowable operating pressure: High-pressure distribution systems. (a) No person may operate a segment of a high pressure distribution system at a pressure that exceeds the... segment of a distribution system otherwise designed to operate at over 60 p.s.i. (414 kPa) gage, unless...
14 CFR 27.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2012 CFR
2012-01-01
... Systems § 27.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Power boost and power-operated control...
14 CFR 27.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Systems § 27.695 Power boost and power-operated control system. (a) If a power boost or power-operated... failure of all engines. (b) Each alternate system may be a duplicate power portion or a manually operated... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Power boost and power-operated control...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tian, Tian; Chernyakhovskiy, Ilya; Brancucci Martinez-Anido, Carlo
This document is the Spanish version of 'Greening the Grid- Forecasting Wind and Solar Generation Improving System Operations'. It discusses improving system operations with forecasting with and solar generation. By integrating variable renewable energy (VRE) forecasts into system operations, power system operators can anticipate up- and down-ramps in VRE generation in order to cost-effectively balance load and generation in intra-day and day-ahead scheduling. This leads to reduced fuel costs, improved system reliability, and maximum use of renewable resources.
Intent inferencing with a model-based operator's associate
NASA Technical Reports Server (NTRS)
Jones, Patricia M.; Mitchell, Christine M.; Rubin, Kenneth S.
1989-01-01
A portion of the Operator Function Model Expert System (OFMspert) research project is described. OFMspert is an architecture for an intelligent operator's associate or assistant that can aid the human operator of a complex, dynamic system. Intelligent aiding requires both understanding and control. The understanding (i.e., intent inferencing) ability of the operator's associate is discussed. Understanding or intent inferencing requires a model of the human operator; the usefulness of an intelligent aid depends directly on the fidelity and completeness of its underlying model. The model chosen for this research is the operator function model (OFM). The OFM represents operator functions, subfunctions, tasks, and actions as a heterarchic-hierarchic network of finite state automata, where the arcs in the network are system triggering events. The OFM provides the structure for intent inferencing in that operator functions and subfunctions correspond to likely operator goals and plans. A blackboard system similar to that of Human Associative Processor (HASP) is proposed as the implementation of intent inferencing function. This system postulates operator intentions based on current system state and attempts to interpret observed operator actions in light of these hypothesized intentions.
Prognostic Analysis System and Methods of Operation
NASA Technical Reports Server (NTRS)
MacKey, Ryan M. E. (Inventor); Sneddon, Robert (Inventor)
2014-01-01
A prognostic analysis system and methods of operating the system are provided. In particular, a prognostic analysis system for the analysis of physical system health applicable to mechanical, electrical, chemical and optical systems and methods of operating the system are described herein.
75 FR 11161 - Combined Notice of Filings #1
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-10
... Generator Interconnection Agreement among SES Solar One, LLC et al. Filed Date: 02/25/2010. Accession Number... System Operator Inc. Description: New York Independent System Operator, Inc submits proposed revisions to... Independent Transmission System Operator Inc. Description: Midwest Independent Transmission System Operator...
Code of Federal Regulations, 2012 CFR
2012-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Reports Required To Be Made by Operators of Credit Card Systems § 1028.300 General. Operators of credit card systems are... contained in that subpart which apply to operators of credit card systems. ...
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Reports Required To Be Made by Operators of Credit Card Systems § 1028.300 General. Operators of credit card systems are... contained in that subpart which apply to operators of credit card systems. ...
[Computerized monitoring system in the operating center with UNIX and X-window].
Tanaka, Y; Hashimoto, S; Chihara, E; Kinoshita, T; Hirose, M; Nakagawa, M; Murakami, T
1992-01-01
We previously reported the fully automated data logging system in the operating center. Presently, we revised the system using a highly integrated operating system, UNIX instead of OS/9. With this multi-task and multi-window (X-window) system, we could monitor all 12 rooms in the operating center at a time. The system in the operating center consists of 2 computers, SONY NEWS1450 (UNIX workstation) and Sord M223 (CP/M, data logger). On the bitmapped display of the workstation, using X-window, the data of all the operating rooms can be visualized. Furthermore, 2 other minicomputers (Fujitsu A50 in the conference room, and A60 in the ICU) and a workstation (Sun3-80 in the ICU) were connected with ethernet. With the remote login function (NFS), we could easily obtain the data during the operation from outside the operating center. This system works automatically and needs no routine maintenance.
40 CFR 49.4164 - Construction and operational control measures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... closed-vent system to: (i) An operating system designed to recover and inject all the produced natural... through a closed-vent system to: (i) An operating system designed to recover and inject the natural gas... operating system designed to recover and inject natural gas becomes temporarily infeasible and there is no...
40 CFR 49.4164 - Construction and operational control measures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... closed-vent system to: (i) An operating system designed to recover and inject all the produced natural... through a closed-vent system to: (i) An operating system designed to recover and inject the natural gas... operating system designed to recover and inject natural gas becomes temporarily infeasible and there is no...
1987-09-01
real - time operating system should be efficient from the real-time point...5,8]) system naming scheme. 3.2 Protecting Objects Real-time embedded systems usually neglect protection mechanisms. However, a real - time operating system cannot...allocation mechanism should adhere to application constraints. This strong relationship between a real - time operating system and the application
ERIC Educational Resources Information Center
Mitchell, Christine M.; Govindaraj, T.
1990-01-01
Discusses the use of intelligent tutoring systems as opposed to traditional on-the-job training for training operators of complex dynamic systems and describes the computer architecture for a system for operators of a NASA (National Aeronautics and Space Administration) satellite control system. An experimental evaluation with college students is…
EOS Operations Systems: EDOS Implemented Changes to Reduce Operations Costs
NASA Technical Reports Server (NTRS)
Cordier, Guy R.; Gomez-Rosa, Carlos; McLemore, Bruce D.
2007-01-01
The authors describe in this paper the progress achieved to-date with the reengineering of the Earth Observing System (EOS) Data and Operations System (EDOS), the experience gained in the process and the ensuing reduction of ground systems operations costs. The reengineering effort included a major methodology change, applying to an existing schedule driven system, a data-driven system approach.
Expert operator's associate: A knowledge based system for spacecraft control
NASA Technical Reports Server (NTRS)
Nielsen, Mogens; Grue, Klaus; Lecouat, Francois
1991-01-01
The Expert Operator's Associate (EOA) project is presented which studies the applicability of expert systems for day-to-day space operations. A prototype expert system is developed, which operates on-line with an existing spacecraft control system at the European Space Operations Centre, and functions as an 'operator's assistant' in controlling satellites. The prototype is demonstrated using an existing real-time simulation model of the MARECS-B2 telecommunication satellite. By developing a prototype system, the extent to which reliability and effectivens of operations can be enhanced by AI based support is examined. In addition the study examines the questions of acquisition and representation of the 'knowledge' for such systems, and the feasibility of 'migration' of some (currently) ground-based functions into future spaceborne autonomous systems.
The embedded operating system project
NASA Technical Reports Server (NTRS)
Campbell, R. H.
1984-01-01
This progress report describes research towards the design and construction of embedded operating systems for real-time advanced aerospace applications. The applications concerned require reliable operating system support that must accommodate networks of computers. The report addresses the problems of constructing such operating systems, the communications media, reconfiguration, consistency and recovery in a distributed system, and the issues of realtime processing. A discussion is included on suitable theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based systems. In particular, this report addresses: atomic actions, fault tolerance, operating system structure, program development, reliability and availability, and networking issues. This document reports the status of various experiments designed and conducted to investigate embedded operating system design issues.
Advanced Hard Real-Time Operating System, the Maruti Project. Part 2.
1997-01-01
Real - Time Operating System , The Maruti Project DASG-60-92-C-0055 5b. Program Element # 62301E 6. Author(s...The maruti hard real - time " operating system . A CM SIGOPS, Operating Systems Review. 23:90-106, July 1989. 254 !1 110) C. L. Liu and J. Layland...February 14, 1995 Abstract The Maruti Real - Time Operating System was developed for applications that must meet hard real-time constraints. In order
Modeling of the Human - Operator in a Complex System Functioning Under Extreme Conditions
NASA Astrophysics Data System (ADS)
Getzov, Peter; Hubenova, Zoia; Yordanov, Dimitar; Popov, Wiliam
2013-12-01
Problems, related to the explication of sophisticated control systems of objects, operating under extreme conditions, have been examined and the impact of the effectiveness of the operator's activity on the systems as a whole. The necessity of creation of complex simulation models, reflecting operator's activity, is discussed. Organizational and technical system of an unmanned aviation complex is described as a sophisticated ergatic system. Computer realization of main subsystems of algorithmic system of the man as a controlling system is implemented and specialized software for data processing and analysis is developed. An original computer model of a Man as a tracking system has been implemented. Model of unmanned complex for operators training and formation of a mental model in emergency situation, implemented in "matlab-simulink" environment, has been synthesized. As a unit of the control loop, the pilot (operator) is simplified viewed as an autocontrol system consisting of three main interconnected subsystems: sensitive organs (perception sensors); central nervous system; executive organs (muscles of the arms, legs, back). Theoretical-data model of prediction the level of operator's information load in ergatic systems is proposed. It allows the assessment and prediction of the effectiveness of a real working operator. Simulation model of operator's activity in takeoff based on the Petri nets has been synthesized.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-16
... ceasing operations of XLE, the Exchange has solely operated an options market. The System will allow PSX..., Display and Execution The System will operate, and orders can be entered into the System, from 9 a.m. to 5... satisfies this requirement. \\63\\ In considering the operation of automated execution systems operated by an...
14 CFR 417.405 - Ground safety analysis.
Code of Federal Regulations, 2011 CFR
2011-01-01
... hazard from affecting the public. A launch operator must incorporate the launch site operator's systems... personnel who are knowledgeable of launch vehicle systems, launch processing, ground systems, operations...) Begin a ground safety analysis by identifying the systems and operations to be analyzed; (2) Define the...
14 CFR 417.405 - Ground safety analysis.
Code of Federal Regulations, 2010 CFR
2010-01-01
... hazard from affecting the public. A launch operator must incorporate the launch site operator's systems... personnel who are knowledgeable of launch vehicle systems, launch processing, ground systems, operations...) Begin a ground safety analysis by identifying the systems and operations to be analyzed; (2) Define the...
A multiprocessor operating system simulator
DOE Office of Scientific and Technical Information (OSTI.GOV)
Johnston, G.M.; Campbell, R.H.
1988-01-01
This paper describes a multiprocessor operating system simulator that was developed by the authors in the Fall of 1987. The simulator was built in response to the need to provide students with an environment in which to build and test operating system concepts as part of the coursework of a third-year undergraduate operating systems course. Written in C++, the simulator uses the co-routine style task package that is distributed with the AT and T C++ Translator to provide a hierarchy of classes that represents a broad range of operating system software and hardware components. The class hierarchy closely follows thatmore » of the Choices family of operating systems for loosely and tightly coupled multiprocessors. During an operating system course, these classes are refined and specialized by students in homework assignments to facilitate experimentation with different aspects of operating system design and policy decisions. The current implementation runs on the IBM RT PC under 4.3bsd UNIX.« less
An Investigation into Soft Error Detection Efficiency at Operating System Level
Taheri, Hassan
2014-01-01
Electronic equipment operating in harsh environments such as space is subjected to a range of threats. The most important of these is radiation that gives rise to permanent and transient errors on microelectronic components. The occurrence rate of transient errors is significantly more than permanent errors. The transient errors, or soft errors, emerge in two formats: control flow errors (CFEs) and data errors. Valuable research results have already appeared in literature at hardware and software levels for their alleviation. However, there is the basic assumption behind these works that the operating system is reliable and the focus is on other system levels. In this paper, we investigate the effects of soft errors on the operating system components and compare their vulnerability with that of application level components. Results show that soft errors in operating system components affect both operating system and application level components. Therefore, by providing endurance to operating system level components against soft errors, both operating system and application level components gain tolerance. PMID:24574894
An investigation into soft error detection efficiency at operating system level.
Asghari, Seyyed Amir; Kaynak, Okyay; Taheri, Hassan
2014-01-01
Electronic equipment operating in harsh environments such as space is subjected to a range of threats. The most important of these is radiation that gives rise to permanent and transient errors on microelectronic components. The occurrence rate of transient errors is significantly more than permanent errors. The transient errors, or soft errors, emerge in two formats: control flow errors (CFEs) and data errors. Valuable research results have already appeared in literature at hardware and software levels for their alleviation. However, there is the basic assumption behind these works that the operating system is reliable and the focus is on other system levels. In this paper, we investigate the effects of soft errors on the operating system components and compare their vulnerability with that of application level components. Results show that soft errors in operating system components affect both operating system and application level components. Therefore, by providing endurance to operating system level components against soft errors, both operating system and application level components gain tolerance.
The Automation-by-Expertise-by-Training Interaction.
Strauch, Barry
2017-03-01
I introduce the automation-by-expertise-by-training interaction in automated systems and discuss its influence on operator performance. Transportation accidents that, across a 30-year interval demonstrated identical automation-related operator errors, suggest a need to reexamine traditional views of automation. I review accident investigation reports, regulator studies, and literature on human computer interaction, expertise, and training and discuss how failing to attend to the interaction of automation, expertise level, and training has enabled operators to commit identical automation-related errors. Automated systems continue to provide capabilities exceeding operators' need for effective system operation and provide interfaces that can hinder, rather than enhance, operator automation-related situation awareness. Because of limitations in time and resources, training programs do not provide operators the expertise needed to effectively operate these automated systems, requiring them to obtain the expertise ad hoc during system operations. As a result, many do not acquire necessary automation-related system expertise. Integrating automation with expected operator expertise levels, and within training programs that provide operators the necessary automation expertise, can reduce opportunities for automation-related operator errors. Research to address the automation-by-expertise-by-training interaction is needed. However, such research must meet challenges inherent to examining realistic sociotechnical system automation features with representative samples of operators, perhaps by using observational and ethnographic research. Research in this domain should improve the integration of design and training and, it is hoped, enhance operator performance.
NASA Technical Reports Server (NTRS)
Byrd, Raymond J.
1990-01-01
This study was initiated to identify operations problems and cost drivers for current propulsion systems and to identify technology and design approaches to increase the operational efficiency and reduce operations costs for future propulsion systems. To provide readily usable data for the Advance Launch System (ALS) program, the results of the Operationally Efficient Propulsion System Study (OEPSS) were organized into a series of OEPSS Data Books as follows: Volume 1, Generic Ground Operations Data; Volume 2, Ground Operations Problems; Volume 3, Operations Technology; Volume 4, OEPSS Design Concepts; and Volume 5, OEPSS Final Review Briefing, which summarizes the activities and results of the study. This volume presents ground processing data for a generic LOX/LH2 booster and core propulsion system based on current STS experience. The data presented includes: top logic diagram, process flow, activities bar-chart, loaded timelines, manpower requirements in terms of duration, headcount and skill mix per operations and maintenance instruction (OMI), and critical path tasks and durations.
NASA Technical Reports Server (NTRS)
Fink, Wolfgang (Inventor); Dohm, James (Inventor); Tarbell, Mark A. (Inventor)
2010-01-01
A multi-agent autonomous system for exploration of hazardous or inaccessible locations. The multi-agent autonomous system includes simple surface-based agents or craft controlled by an airborne tracking and command system. The airborne tracking and command system includes an instrument suite used to image an operational area and any craft deployed within the operational area. The image data is used to identify the craft, targets for exploration, and obstacles in the operational area. The tracking and command system determines paths for the surface-based craft using the identified targets and obstacles and commands the craft using simple movement commands to move through the operational area to the targets while avoiding the obstacles. Each craft includes its own instrument suite to collect information about the operational area that is transmitted back to the tracking and command system. The tracking and command system may be further coupled to a satellite system to provide additional image information about the operational area and provide operational and location commands to the tracking and command system.
NASA Technical Reports Server (NTRS)
1993-01-01
The Second International Symposium featured 135 oral presentations in these 12 categories: Future Missions and Operations; System-Level Architectures; Mission-Specific Systems; Mission and Science Planning and Sequencing; Mission Control; Operations Automation and Emerging Technologies; Data Acquisition; Navigation; Operations Support Services; Engineering Data Analysis of Space Vehicle and Ground Systems; Telemetry Processing, Mission Data Management, and Data Archiving; and Operations Management. Topics focused on improvements in the productivity, effectiveness, efficiency, and quality of mission operations, ground systems, and data acquisition. Also emphasized were accomplishments in management of human factors; use of information systems to improve data retrieval, reporting, and archiving; design and implementation of logistics support for mission operations; and the use of telescience and teleoperations.
49 CFR 325.37 - Location and operation of sound level measurement system; highway operations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 49 Transportation 5 2011-10-01 2011-10-01 false Location and operation of sound level measurement...; Highway Operations § 325.37 Location and operation of sound level measurement system; highway operations. (a) The microphone of a sound level measurement system that conforms to the rules in § 325.23 of this...
Analysis of remote operating systems for space-based servicing operations, volume 1
NASA Technical Reports Server (NTRS)
1985-01-01
A two phase study was conducted to analyze and develop the requirements for remote operating systems as applied to space based operations for the servicing, maintenance, and repair of satellites. Phase one consisted of the development of servicing requirements to establish design criteria for remote operating systems. Phase two defined preferred system concepts and development plans which met the requirements established in phase one. The specific tasks in phase two were to: (1) identify desirable operational and conceptual approaches for selected mission scenarios; (2) examine the potential impact of remote operating systems incorporated into the design of the space station; (3) address remote operating systems design issues, such as mobility, which are effected by the space station configuration; and (4) define the programmatic approaches for technology development, testing, simulation, and flight demonstration.
Advanced Ground Systems Maintenance Physics Models For Diagnostics Project
NASA Technical Reports Server (NTRS)
Perotti, Jose M.
2015-01-01
The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations. This project will develop and implement high-fidelity physics-based modeling techniques tosimulate the real-time operation of cryogenics and other fluids systems and, when compared to thereal-time operation of the actual systems, provide assessment of their state. Physics-modelcalculated measurements (called “pseudo-sensors”) will be compared to the system real-timedata. Comparison results will be utilized to provide systems operators with enhanced monitoring ofsystems' health and status, identify off-nominal trends and diagnose system/component failures.This capability can also be used to conduct planning and analysis of cryogenics and other fluidsystems designs. This capability will be interfaced with the ground operations command andcontrol system as a part of the Advanced Ground Systems Maintenance (AGSM) project to helpassure system availability and mission success. The initial capability will be developed for theLiquid Oxygen (LO2) ground loading systems.
A Network Architecture for Data-Driven Systems
1985-07-01
ELABORATION. ..... ..... 26 Real - Time Operating System . ....... ......... 26 Secondary Memory Utilization. ........ ....... 26 Data Flow Graphical...discussions followed by a flight simulator exam~ple. REAL - TIME OPERATING SYSTEM An operating system needs to be designed exclusively for real-time...Assessment. (SDWA) module. The SDWA module is tightly coupled to the real - time operating system . This module must determine the sensitivity to
40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.
Code of Federal Regulations, 2010 CFR
2010-07-01
... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...
40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.
Code of Federal Regulations, 2011 CFR
2011-07-01
... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...
40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.
Code of Federal Regulations, 2014 CFR
2014-07-01
... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...
40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.
Code of Federal Regulations, 2012 CFR
2012-07-01
... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...
40 CFR 280.230 - Operating an underground storage tank or underground storage tank system.
Code of Federal Regulations, 2013 CFR
2013-07-01
... underground storage tank or underground storage tank system. (a) Operating an UST or UST system prior to...) Operating an UST or UST system after foreclosure. The following provisions apply to a holder who, through..., the purchaser must decide whether to operate or close the UST or UST system in accordance with...
Deepen the Teaching Reform of Operating System, Cultivate the Comprehensive Quality of Students
ERIC Educational Resources Information Center
Liu, Jianjun
2010-01-01
Operating system is the core course of the specialty of computer science and technology. To understand and master the operating system will directly affect students' further study on other courses. The course of operating system focuses more on theories. Its contents are more abstract and the knowledge system is more complicated. Therefore,…
Operationally Efficient Propulsion System Study (OEPSS) data book. Executive summary
NASA Technical Reports Server (NTRS)
Wong, George S.
1990-01-01
The study was initiated to identify operations problems and cost drivers for current propulsion systems and to identify technology and design approaches to increase the operational efficiency and reduce operations costs for future propulsion systems. To provide readily usable data for the Advanced Launch System (ALS) program, the results of the Operationally Efficient Propulsion System Study (OEPSS) were organized into a series of OEPSS Data Books as follows: Volume 1, Generic Ground Operations Data; Volume 2, Ground Operations Problems; Volume 3, Operations Technology; Volume 4, OEPSS Design Concepts; and Volume 5, OEPSS Final Review Briefing, which summarizes the activities and results of the study. Summarized here are the salient results of the first year. A synopsis of each volume listed above is presented.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-01
... Packard Company Business Critical Systems, Mission Critical Business Software Division, OpenVMS Operating... Software Division, OpenVMS Operating System Development Group, Including an Employee Operating Out of the..., Mission Critical Business Software Division, OpenVMS Operating System Development Group, including...
14 CFR 29.683 - Operation tests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction Control Systems § 29.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment with the control system loaded to correspond with loads specified for the system, the system is free...
14 CFR 27.683 - Operation tests.
Code of Federal Regulations, 2013 CFR
2013-01-01
... STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.683 Operation tests. It must be shown by operation tests that, when the controls are operated from the pilot compartment with the control system loaded to correspond with loads specified for the system, the system is free from...
Designing Flight-Deck Procedures
NASA Technical Reports Server (NTRS)
Degani, Asaf; Wiener, L.; Shafto, Mike (Technical Monitor)
1995-01-01
A complex human-machine system consists of more than merely one or more human operators and a collection of hardware components. In order to operate a complex system successfully, the human-machine system must be supported by an organizational infrastructure of operating concepts, rules, guidelines, and documents. The coherency of such operating concepts, in terms of consistency and logic, is vitally important for the efficiency and safety of any complex system. In high-risk endeavors such as aircraft operations, space flight, nuclear power production, manufacturing process control, and military operations, it is essential that such support be flawless, as the price of operational error can be high. When operating rules are not adhered to, or the rules are inadequate for the task at hand, not only will the system's goals be thwarted, but there may also be tragic human and material consequences. To ensure safe and predictable operations, support to the operators, in this case flight crews, often comes in the form of standard operating procedures. These provide the crew with step-by-step guidance for carrying out their operations. Standard procedures do indeed promote uniformity, but they do so at the risk of reducing the role of human operators to a lower level. Management, however, must recognize the danger of over-procedurization, which fails to exploit one of the most valuable assets in the system, the intelligent operator who is "on the scene." The alert system designer and operations manager recognize that there cannot be a procedure for everything, and the time will come in which the operators of a complex system will face a situation for which there is no written procedure. Procedures, whether executed by humans or machines, have their place, but so does human cognition.
1991-10-01
Real - Time Operating System , Hide Tokuda, et al., Carnegie Mellon University "* MARUTI, Hard Real - Time Operating System , Ashok...Architecture, Fred J. Pollack and Kevin C. Kahn, BiiN 10:00 - 10:20 BREAK 10:20 - 12:20 Session VII - Chair: James G. Smith, ONR • A Real - Time Operating System for...Detailed Description * POSIX: Detailed Description * V: Detailed Description * Real - Time Operating System
Methodology for Designing Operational Banking Risks Monitoring System
NASA Astrophysics Data System (ADS)
Kostjunina, T. N.
2018-05-01
The research looks at principles of designing an information system for monitoring operational banking risks. A proposed design methodology enables one to automate processes of collecting data on information security incidents in the banking network, serving as the basis for an integrated approach to the creation of an operational risk management system. The system can operate remotely ensuring tracking and forecasting of various operational events in the bank network. A structure of a content management system is described.
Stochastic availability analysis of operational data systems in the Deep Space Network
NASA Technical Reports Server (NTRS)
Issa, T. N.
1991-01-01
Existing availability models of standby redundant systems consider only an operator's performance and its interaction with the hardware performance. In the case of operational data systems in the Deep Space Network (DSN), in addition to an operator system interface, a controller reconfigures the system and links a standby unit into the network data path upon failure of the operating unit. A stochastic (Markovian) process technique is used to model and analyze the availability performance and occurrence of degradation due to partial failures are quantitatively incorporated into the model. Exact expressions of the steady state availability and proportion degraded performance measures are derived for the systems under study. The interaction among the hardware, operator, and controller performance parameters and that interaction's effect on data availability are evaluated and illustrated for an operational data processing system.
Specification and Verification of Secure Concurrent and Distributed Software Systems
1992-02-01
primitive search strategies work for operating systems that contain relatively few operations . As the number of operations increases, so does the the...others have granted him access to, etc . The burden of security falls on the operating system , although appropriate hardware support can minimize the...Guttag, J. Horning, and R. Levin. Synchronization primitives for a multiprocessor: a formal specification. Symposium on Operating System Principles
Appraisal of the Operation Respond Emergency Information System (OREIS)
DOT National Transportation Integrated Search
1998-04-01
The Operation Respond Institute has been instrumental in developing the Operation Respond Emergency Information System (OREIS) for first responders to hazardous material incidents in transportation. The Operation Respond system aims to facilitate rap...
49 CFR 236.504 - Operation interconnected with automatic block-signal system.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 49 Transportation 4 2010-10-01 2010-10-01 false Operation interconnected with automatic block... Operation interconnected with automatic block-signal system. (a) A continuous inductive automatic train stop or train control system shall operate in connection with an automatic block signal system and shall...
46 CFR 184.610 - Public address systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... public address system must be a fixed installation and be audible during normal operating conditions... system operable from the operating station. (d) On a vessel of not more than 19.8 meters (65 feet) in... passengers, a public address system is not required if a public announcement made from operating station...
14 CFR 25.683 - Operation tests.
Code of Federal Regulations, 2010 CFR
2010-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads... control system are loaded to the maximum load expected in normal operation, the system is free from— (a...
14 CFR 25.683 - Operation tests.
Code of Federal Regulations, 2011 CFR
2011-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads... control system are loaded to the maximum load expected in normal operation, the system is free from— (a...
14 CFR 25.683 - Operation tests.
Code of Federal Regulations, 2014 CFR
2014-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads... control system are loaded to the maximum load expected in normal operation, the system is free from— (a...
14 CFR 25.683 - Operation tests.
Code of Federal Regulations, 2012 CFR
2012-01-01
... STANDARDS: TRANSPORT CATEGORY AIRPLANES Design and Construction Control Systems § 25.683 Operation tests. It must be shown by operation tests that when portions of the control system subject to pilot effort loads... control system are loaded to the maximum load expected in normal operation, the system is free from— (a...
Systems and Algorithms for Automated Collaborative Observation Using Networked Robotic Cameras
ERIC Educational Resources Information Center
Xu, Yiliang
2011-01-01
The development of telerobotic systems has evolved from Single Operator Single Robot (SOSR) systems to Multiple Operator Multiple Robot (MOMR) systems. The relationship between human operators and robots follows the master-slave control architecture and the requests for controlling robot actuation are completely generated by human operators. …
Cognitive Systems Modeling and Analysis of Command and Control Systems
NASA Technical Reports Server (NTRS)
Norlander, Arne
2012-01-01
Military operations, counter-terrorism operations and emergency response often oblige operators and commanders to operate within distributed organizations and systems for safe and effective mission accomplishment. Tactical commanders and operators frequently encounter violent threats and critical demands on cognitive capacity and reaction time. In the future they will make decisions in situations where operational and system characteristics are highly dynamic and non-linear, i.e. minor events, decisions or actions may have serious and irreversible consequences for the entire mission. Commanders and other decision makers must manage true real time properties at all levels; individual operators, stand-alone technical systems, higher-order integrated human-machine systems and joint operations forces alike. Coping with these conditions in performance assessment, system development and operational testing is a challenge for both practitioners and researchers. This paper reports on research from which the results led to a breakthrough: An integrated approach to information-centered systems analysis to support future command and control systems research development. This approach integrates several areas of research into a coherent framework, Action Control Theory (ACT). It comprises measurement techniques and methodological advances that facilitate a more accurate and deeper understanding of the operational environment, its agents, actors and effectors, generating new and updated models. This in turn generates theoretical advances. Some good examples of successful approaches are found in the research areas of cognitive systems engineering, systems theory, and psychophysiology, and in the fields of dynamic, distributed decision making and naturalistic decision making.
Telerobotic workstation design aid
NASA Technical Reports Server (NTRS)
Corker, K.; Hudlicka, E.; Young, D.; Cramer, N.
1989-01-01
Telerobot systems are being developed to support a number of space mission applications. In low earth orbit, telerobots and teleoperated manipulators will be used in shuttle operations and space station construction/maintenance. Free flying telerobotic service vehicles will be used at low and geosynchronous orbital operations. Rovers and autonomous vehicles will be equipped with telerobotic devices in planetary exploration. In all of these systems, human operators will interact with the robot system at varied levels during the scheduled operations. The human operators may be in either orbital or ground-based control systems. To assure integrated system development and maximum utility across these systems, designers must be sensitive to the constraints and capabilities that the human brings to system operation and must be assisted in applying these human factors to system development. The simulation and analysis system is intended to serve the needs of system analysis/designers as an integrated workstation in support of telerobotic design.
Ultrashort-Pulse Laser System: Theory of Operation and Operating Procedures
1992-07-01
Nov 89 - Jul 92 4. TITLE AND SUBTITLE 5. FUNDING NUMBERS Ultrashort-Pulse Laser System : Theory of Operation and C - F33615-88-C-0631 Operating...i ’IR~A&, D2;" T.&B [E] al uicod [] j 0 Avhi lp.bilty C: oded’ Avail i Qiv ULTRASHORT-PULSE LASER SYSTEM : THEORY OF OPERATION AND OPERATING PROCEDURES
Solar power satellite system definition study, phase 2. Part 1: Midterm briefing
NASA Technical Reports Server (NTRS)
1979-01-01
An overview of the program plan for the Solar Power Satellite Program is given. Progress in the microwave power transmission system is reported. A description is given of the following: (1) launch and recovery site facilities, systems and operations; (2) cargo packaging; (3) earth-to-LEO cargo transportation operations; (4) LEO-to-GEO cargo transportation operations; (5) personnel transportation operations; (6) space vehicles in-space maintenance operations; and (7) SPS maintenance systems and operations. Other topics discussed include GEO base operations, satellite construction operations, intra-base logistics, and GEO base definition. A research and program plan is presented along with cost estimates.
International Space Station Alpha user payload operations concept
NASA Technical Reports Server (NTRS)
Schlagheck, Ronald A.; Crysel, William B.; Duncan, Elaine F.; Rider, James W.
1994-01-01
International Space Station Alpha (ISSA) will accommodate a variety of user payloads investigating diverse scientific and technology disciplines on behalf of five international partners: Canada, Europe, Japan, Russia, and the United States. A combination of crew, automated systems, and ground operations teams will control payload operations that require complementary on-board and ground systems. This paper presents the current planning for the ISSA U.S. user payload operations concept and the functional architecture supporting the concept. It describes various NASA payload operations facilities, their interfaces, user facility flight support, the payload planning system, the onboard and ground data management system, and payload operations crew and ground personnel training. This paper summarizes the payload operations infrastructure and architecture developed at the Marshall Space Flight Center (MSFC) to prepare and conduct ISSA on-orbit payload operations from the Payload Operations Integration Center (POIC), and from various user operations locations. The authors pay particular attention to user data management, which includes interfaces with both the onboard data management system and the ground data system. Discussion covers the functional disciplines that define and support POIC payload operations: Planning, Operations Control, Data Management, and Training. The paper describes potential interfaces between users and the POIC disciplines, from the U.S. user perspective.
An expert system for benzole recovery plant
DOE Office of Scientific and Technical Information (OSTI.GOV)
Ishiguro, H.; Matsumura, S.; Kawashima, A.
1993-01-01
In the By-Product Plant of NKK's Keihin Works, systematization efforts were made in 1988, including integration of the control rooms, introduction of computers and installation of automatic analyzers. This has however increased the burden on operators with a huge volume of data, and a delay in coping with an operational abnormality might expand risk and extent of damages. There is, on the other hand, a pressing need to take measures to accommodate sophisticated operations resulting from the pursuit of high productivity operation. For the purpose of avoiding these possible inconveniences, development of a real-time operation system has been tried inmore » an attempt to improve safety and operating techniques and productivity in the benzole recovery plant. An offline system based on manual entry of operating data for diagnosis of operation and abnormality was developed in 1990, and an online real-time system operating by incorporating real-time operating data was developed in 1991, which is now smoothly operating in commercial operations. This report presents an outline of the benzole recovery operation diagnosis control expert system.« less
2000-10-01
control systems and prototyped the approach by porting the ILU ORB from Xerox to the Lynx real - time operating system . They then provided a distributed...compliant real - time operating system , a real-time ORB, and an ODMG-compliant real-time ODBMS [12]. The MITRE system is an infrastructure for...the server’s local operating system can handle. For instance, on a node controlled by the VXWorks real - time operating system with 256 local
A Framework for Enterprise Operating Systems Based on Zachman Framework
NASA Astrophysics Data System (ADS)
Ostadzadeh, S. Shervin; Rahmani, Amir Masoud
Nowadays, the Operating System (OS) isn't only the software that runs your computer. In the typical information-driven organization, the operating system is part of a much larger platform for applications and data that extends across the LAN, WAN and Internet. An OS cannot be an island unto itself; it must work with the rest of the enterprise. Enterprise wide applications require an Enterprise Operating System (EOS). Enterprise operating systems used in an enterprise have brought about an inevitable tendency to lunge towards organizing their information activities in a comprehensive way. In this respect, Enterprise Architecture (EA) has proven to be the leading option for development and maintenance of enterprise operating systems. EA clearly provides a thorough outline of the whole information system comprising an enterprise. To establish such an outline, a logical framework needs to be laid upon the entire information system. Zachman Framework (ZF) has been widely accepted as a standard scheme for identifying and organizing descriptive representations that have prominent roles in enterprise-wide system development. In this paper, we propose a framework based on ZF for enterprise operating systems. The presented framework helps developers to design and justify completely integrated business, IT systems, and operating systems which results in improved project success rate.
NASA Astrophysics Data System (ADS)
Gorman, J.; Voshell, M.; Sliva, A.
2016-09-01
The United States is highly dependent on space resources to support military, government, commercial, and research activities. Satellites operate at great distances, observation capacity is limited, and operator actions and observations can be significantly delayed. Safe operations require support systems that provide situational understanding, enhance decision making, and facilitate collaboration between human operators and system automation both in-the-loop, and on-the-loop. Joint cognitive systems engineering (JCSE) provides a rich set of methods for analyzing and informing the design of complex systems that include both human decision-makers and autonomous elements as coordinating teammates. While, JCSE-based systems can enhance a system analysts' understanding of both existing and new system processes, JCSE activities typically occur outside of traditional systems engineering (SE) methods, providing sparse guidance about how systems should be implemented. In contrast, the Joint Director's Laboratory (JDL) information fusion model and extensions, such as the Dual Node Network (DNN) technical architecture, provide the means to divide and conquer such engineering and implementation complexity, but are loosely coupled to specialized organizational contexts and needs. We previously describe how Dual Node Decision Wheels (DNDW) extend the DNN to integrate JCSE analysis and design with the practicalities of system engineering and implementation using the DNN. Insights from Rasmussen's JCSE Decision Ladders align system implementation with organizational structures and processes. In the current work, we present a novel approach to assessing system performance based on patterns occurring in operational decisions that are documented by JCSE processes as traces in a decision ladder. In this way, system assessment is closely tied not just to system design, but the design of the joint cognitive system that includes human operators, decision-makers, information systems, and automated processes. Such operationally relevant and integrated testing provides a sound foundation for operator trust in system automation that is required to safely operate satellite systems.
Perfect commuting-operator strategies for linear system games
NASA Astrophysics Data System (ADS)
Cleve, Richard; Liu, Li; Slofstra, William
2017-01-01
Linear system games are a generalization of Mermin's magic square game introduced by Cleve and Mittal. They show that perfect strategies for linear system games in the tensor-product model of entanglement correspond to finite-dimensional operator solutions of a certain set of non-commutative equations. We investigate linear system games in the commuting-operator model of entanglement, where Alice and Bob's measurement operators act on a joint Hilbert space, and Alice's operators must commute with Bob's operators. We show that perfect strategies in this model correspond to possibly infinite-dimensional operator solutions of the non-commutative equations. The proof is based around a finitely presented group associated with the linear system which arises from the non-commutative equations.
Timeline-Based Mission Operations Architecture: An Overview
NASA Technical Reports Server (NTRS)
Chung, Seung H.; Bindschadler, Duane L.
2012-01-01
Some of the challenges in developing a mission operations system and operating a mission can be traced back to the challenge of integrating a mission operations system from its many components and to the challenge of maintaining consistent and accountable information throughout the operations processes. An important contributing factor to both of these challenges is the file-centric nature of today's systems. In this paper, we provide an overview of these challenges and argue the need to move toward an information-centric mission operations system. We propose an information representation called Timeline as an approach to enable such a move, and we provide an overview of a Timeline-based Mission Operations System architecture.
Code of Federal Regulations, 2010 CFR
2010-10-01
... entities operating rapid or light rail systems. 37.79 Section 37.79 Transportation Office of the Secretary... operating rapid or light rail systems. Each public entity operating a rapid or light rail system making a... system shall ensure that the vehicle is readily accessible to and usable by individuals with disabilities...
Code of Federal Regulations, 2012 CFR
2012-10-01
... entities operating rapid or light rail systems. 37.79 Section 37.79 Transportation Office of the Secretary... operating rapid or light rail systems. Each public entity operating a rapid or light rail system making a... system shall ensure that the vehicle is readily accessible to and usable by individuals with disabilities...
Code of Federal Regulations, 2013 CFR
2013-10-01
... entities operating rapid or light rail systems. 37.79 Section 37.79 Transportation Office of the Secretary... operating rapid or light rail systems. Each public entity operating a rapid or light rail system making a... system shall ensure that the vehicle is readily accessible to and usable by individuals with disabilities...
Code of Federal Regulations, 2014 CFR
2014-10-01
... entities operating rapid or light rail systems. 37.79 Section 37.79 Transportation Office of the Secretary... operating rapid or light rail systems. Each public entity operating a rapid or light rail system making a... system shall ensure that the vehicle is readily accessible to and usable by individuals with disabilities...
Code of Federal Regulations, 2011 CFR
2011-10-01
... entities operating rapid or light rail systems. 37.79 Section 37.79 Transportation Office of the Secretary... operating rapid or light rail systems. Each public entity operating a rapid or light rail system making a... system shall ensure that the vehicle is readily accessible to and usable by individuals with disabilities...
Extended System Operations Studies for Automated Guideway Transit Systems
DOT National Transportation Integrated Search
1982-02-01
The objectives of the System Operations Studies (SOS) of the Automated Guideway Transit Technology (AGTT) program was to develop models for the analysis of system operations, to evaluate AGT system performance and cost, and to establish guidelines fo...
Analysis of the human operator subsystems
NASA Technical Reports Server (NTRS)
Jones, Lynette A.; Hunter, Ian W.
1991-01-01
Except in low-bandwidth systems, knowledge of the human operator transfer function is essential for high-performance telerobotic systems. This information has usually been derived from detailed analyses of tracking performance, in which the human operator is considered as a complete system rather than as a summation of a number of subsystems, each of which influences the operator's output. Studies of one of these subsystems, the limb mechanics system, demonstrate that large parameter variations can occur that can have a profound effect on the stability of force-reflecting telerobot systems. An objective of this research was to decompose the performance of the human operator system in order to establish how the dynamics of each of the elements influence the operator's responses.
An Operating Environment for the Jellybean Machine
1988-05-01
MODEL 48 5.4.4 Restarting a Context The operating system provides one primitive message (RESTART-CONTEXT) and two system calls (XFERID and XFER.ADDR) to...efficient, powerful services is reqired to support this "stem. To provide this supportive operating environment, I developed an operating system kernel that...serves many of the initial needs of our machine. This Jellybean Operating System Software provides an object- based storage model, where typed
A Cognitive System Model for Human/Automation Dynamics in Airspace Management
NASA Technical Reports Server (NTRS)
Corker, Kevin M.; Pisanich, Gregory; Lebacqz, J. Victor (Technical Monitor)
1997-01-01
NASA has initiated a significant thrust of research and development focused on providing the flight crew and air traffic managers automation aids to increase capacity in en route and terminal area operations through the use of flexible, more fuel-efficient routing, while improving the level of safety in commercial carrier operations. In that system development, definition of cognitive requirements for integrated multi-operator dynamic aiding systems is fundamental. In order to support that cognitive function definition, we have extended the Man Machine Integrated Design and Analysis System (MIDAS) to include representation of multiple cognitive agents (both human operators and intelligent aiding systems) operating aircraft, airline operations centers and air traffic control centers in the evolving airspace. The demands of this application require representation of many intelligent agents sharing world-models, and coordinating action/intention with cooperative scheduling of goals and actions in a potentially unpredictable world of operations. The MIDAS operator models have undergone significant development in order to understand the requirements for operator aiding and the impact of that aiding in the complex nondeterminate system of national airspace operations. The operator model's structure has been modified to include attention functions, action priority, and situation assessment. The cognitive function model has been expanded to include working memory operations including retrieval from long-term store, interference, visual-motor and verbal articulatory loop functions, and time-based losses. The operator's activity structures have been developed to include prioritization and interruption of multiple parallel activities among multiple operators, to provide for anticipation (knowledge of the intention and action of remote operators), and to respond to failures of the system and other operators in the system in situation-specific paradigms. The model's internal representation has been be modified so that multiple, autonomous sets of equipment will function in a scenario as the single equipment sets do now. In order to support the analysis requirements with multiple items of equipment, it is necessary for equipment to access the state of other equipment objects at initialization time (a radar object may need to access the position and speed of aircraft in its area, for example), and as a function of perception and sensor system interaction. The model has been improved to include multiple world-states as a function of equipment am operator interaction. The model has been used -1o predict the impact of warning and alert zones in aircraft operation, and, more critic-ally, the interaction of flight-deck based warning mechanisms and air traffic controller action in response to ground-based conflict prediction and alerting systems. In this operation, two operating systems provide alerting to two autonomous, but linked sets of operators, whose view of the system and whose dynamics in response are radically different. System stability and operator action was predicted using the MIDAS model.
Operator function modeling: An approach to cognitive task analysis in supervisory control systems
NASA Technical Reports Server (NTRS)
Mitchell, Christine M.
1987-01-01
In a study of models of operators in complex, automated space systems, an operator function model (OFM) methodology was extended to represent cognitive as well as manual operator activities. Development continued on a software tool called OFMdraw, which facilitates construction of an OFM by permitting construction of a heterarchic network of nodes and arcs. Emphasis was placed on development of OFMspert, an expert system designed both to model human operation and to assist real human operators. The system uses a blackboard method of problem solving to make an on-line representation of operator intentions, called ACTIN (actions interpreter).
Test, Control and Monitor System (TCMS) operations plan
NASA Technical Reports Server (NTRS)
Macfarlane, C. K.; Conroy, M. P.
1993-01-01
The purpose is to provide a clear understanding of the Test, Control and Monitor System (TCMS) operating environment and to describe the method of operations for TCMS. TCMS is a complex and sophisticated checkout system focused on support of the Space Station Freedom Program (SSFP) and related activities. An understanding of the TCMS operating environment is provided and operational responsibilities are defined. NASA and the Payload Ground Operations Contractor (PGOC) will use it as a guide to manage the operation of the TCMS computer systems and associated networks and workstations. All TCMS operational functions are examined. Other plans and detailed operating procedures relating to an individual operational function are referenced within this plan. This plan augments existing Technical Support Management Directives (TSMD's), Standard Practices, and other management documentation which will be followed where applicable.
49 CFR 571.118 - Standard No. 118; Power-operated window, partition, and roof panel systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
...-operated window, partition, and roof panel systems. S1. Purpose and scope. This standard specifies requirements for power operated window, partition, and roof panel systems to minimize the likelihood of death... Figure 2. Power operated roof panel systems mean moveable panels in the vehicle roof which close by...
49 CFR 571.118 - Standard No. 118; Power-operated window, partition, and roof panel systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
...-operated window, partition, and roof panel systems. S1. Purpose and scope. This standard specifies requirements for power operated window, partition, and roof panel systems to minimize the likelihood of death... Figure 2. Power operated roof panel systems mean moveable panels in the vehicle roof which close by...
40 CFR 49.143 - Construction and operational control measures.
Code of Federal Regulations, 2013 CFR
2013-07-01
...: (i) An operating system designed to recover and inject all the produced natural gas into a natural... closed-vent system to: (i) An operating system designed to recover and inject the natural gas emissions... that pipeline injection of all or part of the natural gas collected in an operating system designed to...
49 CFR 571.118 - Standard No. 118; Power-operated window, partition, and roof panel systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
...-operated window, partition, and roof panel systems. S1. Purpose and scope. This standard specifies requirements for power operated window, partition, and roof panel systems to minimize the likelihood of death... Figure 2. Power operated roof panel systems mean moveable panels in the vehicle roof which close by...
40 CFR 49.143 - Construction and operational control measures.
Code of Federal Regulations, 2014 CFR
2014-07-01
...: (i) An operating system designed to recover and inject all the produced natural gas into a natural... closed-vent system to: (i) An operating system designed to recover and inject the natural gas emissions... that pipeline injection of all or part of the natural gas collected in an operating system designed to...
49 CFR 571.118 - Standard No. 118; Power-operated window, partition, and roof panel systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
...-operated window, partition, and roof panel systems. S1. Purpose and scope. This standard specifies requirements for power operated window, partition, and roof panel systems to minimize the likelihood of death... Figure 2. Power operated roof panel systems mean moveable panels in the vehicle roof which close by...
49 CFR 571.118 - Standard No. 118; Power-operated window, partition, and roof panel systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
...-operated window, partition, and roof panel systems. S1. Purpose and scope. This standard specifies requirements for power operated window, partition, and roof panel systems to minimize the likelihood of death... Figure 2. Power operated roof panel systems mean moveable panels in the vehicle roof which close by...
DOT National Transportation Integrated Search
2009-10-01
Transit Operations Decision Support Systems (TODSS) are systems designed to support dispatchers and others in real-time operations : management in response to incidents, special events, and other changing conditions in order to improve operating spee...
40 CFR 63.4291 - What are my options for meeting the emission limits?
Code of Federal Regulations, 2010 CFR
2010-07-01
... emission capture systems and add-on controls, the organic HAP emission rate for the web coating/printing... demonstrate that all capture systems and control devices for the web coating/printing operation(s) meet the... capture systems and control devices for the web coating/printing operation(s) meet the operating limits...
ASTER system operating achievement for 15 years on orbit
NASA Astrophysics Data System (ADS)
Inada, Hitomi; Ito, Yoshiyuki; Kikuchi, Masakuni; Sakuma, Fumihiro; Tatsumi, Kenji; Akagi, Shigeki; Ono, Hidehiko
2015-10-01
ASTER (Advanced Spaceborne Thermal Emission and Reflection Radiometer) System is operating more than 15 years since launched on board of NASA's Terra spacecraft in December 1999. ASTER System is composed of 3 radiometers (VNIR (Visible and Near Infrared Radiometer), SWIR (Short-Wave Infrared Radiometer), and TIR (Thermal Infrared Radiometer)), CSP (Common Signal Processor) and MSP (Master Power Supply). This paper describes the ASTER System operating history and the achievement of ASTER System long term operation since the initial checkout operation, the normal operation, and the continuous operation. Through the 15 years operation, ASTER system had totally checked the all subsystems (MPS, VNIR, TIR, SWIR, and CSP) health and safety check using telemetry data trend evaluation, and executed the necessary action. The watch items are monitored as the life control items. The pointing mechanics for VNIR, SWIR and TIR, and the cooler for SWIR and TIR are all operating with any problem for over 15 years. In 2003, ASTER was successfully operated for the lunar calibration. As the future plan, ASTER team is proposing the 2nd lunar calibration before the end of mission.
Code of Federal Regulations, 2013 CFR
2013-04-01
... designated to operate in a One-Stop delivery system established prior to the enactment of WIA be designated... (CONTINUED) DESCRIPTION OF THE ONE-STOP SYSTEM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT One-Stop Operators § 662.430 Under what conditions may One-Stop operators designated to operate in a One-Stop...
Code of Federal Regulations, 2014 CFR
2014-04-01
... designated to operate in a One-Stop delivery system established prior to the enactment of WIA be designated... (CONTINUED) DESCRIPTION OF THE ONE-STOP SYSTEM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT One-Stop Operators § 662.430 Under what conditions may One-Stop operators designated to operate in a One-Stop...
Code of Federal Regulations, 2012 CFR
2012-04-01
... designated to operate in a One-Stop delivery system established prior to the enactment of WIA be designated... (CONTINUED) DESCRIPTION OF THE ONE-STOP SYSTEM UNDER TITLE I OF THE WORKFORCE INVESTMENT ACT One-Stop Operators § 662.430 Under what conditions may One-Stop operators designated to operate in a One-Stop...
Data Telemetry and Acquisition System for Acoustic Signal Processing Investigations.
1996-02-20
were VME- based computer systems operating under the VxWorks real - time operating system . Each system shared a common hardware and software... real - time operating system . It interfaces to the Berg PCM Decommutator board, which searches for the embedded synchronization word in the data and re...software were built on top of this architecture. The multi-tasking, message queue and memory management facilities of the VxWorks real - time operating system are
System Shock: The Archetype of Operational Shock
2017-05-25
System Shock: The Archetype of Operational Shock A Monograph by MAJ Benjamen A. McDaniel United States Army School of Advanced Military...Mongraphs 3. DATES COVERED (From - To) JUN 2016- MAY 2017 4. TITLE AND SUBTITLE System Shock: The Archetype of Operational Shock 5a. CONTRACT NUMBER...is whether the US can use the concept of ‘ system shock’ to better operate in the Grey Zone. ‘ System shock’ combines ideas from systems theory, chaos
A Study on the Deriving Requirements of ARGO Operation System
NASA Astrophysics Data System (ADS)
Seo, Yoon-Kyung; Rew, Dong-Young; Lim, Hyung-Chul; Park, In-Kwan; Yim, Hong-Suh; Jo, Jung Hyun; Park, Jong-Uk
2009-12-01
Korea Astronomy and Space Science Institute (KASI) has been developing one mobile and one stationary SLR system since 2008 named as ARGO-M and ARGO-F, respectively. KASI finished the step of deriving the system requirements of ARGO. The requirements include definitions and scopes of various software and hardware components which are necessary for developing the ARGO-M operation system. And the requirements define function, performance, and interface requirements. The operation system consisting of ARGO-M site, ARGO-F site, and Remote Operation Center (ROC) inside KASI is designed for remote access and the automatic tracking and control system which are the main operation concept of ARGO system. To accomplish remote operation, we are considering remote access to ARGO-F and ARGO-M from ROC. The mobile-phone service allows us to access the ARGO-F remotely and to control the system in an emergency. To implement fully automatic tracking and control function in ARGO-F, we have investigated and described the requirements about the automatic aircraft detection system and the various meteorological sensors. This paper addresses the requirements of ARGO Operation System.
Advanced optical blade tip clearance measurement system
NASA Technical Reports Server (NTRS)
Ford, M. J.; Honeycutt, R. E.; Nordlund, R. E.; Robinson, W. W.
1978-01-01
An advanced electro-optical system was developed to measure single blade tip clearances and average blade tip clearances between a rotor and its gas path seal in an operating gas turbine engine. This system is applicable to fan, compressor, and turbine blade tip clearance measurement requirements, and the system probe is particularly suitable for operation in the extreme turbine environment. A study of optical properties of blade tips was conducted to establish measurement system application limitations. A series of laboratory tests was conducted to determine the measurement system's operational performance characteristics and to demonstrate system capability under simulated operating gas turbine environmental conditions. Operational and environmental performance test data are presented.
An expert system to manage the operation of the Space Shuttle's fuel cell cryogenic reactant tanks
NASA Technical Reports Server (NTRS)
Murphey, Amy Y.
1990-01-01
This paper describes a rule-based expert system to manage the operation of the Space Shuttle's cryogenic fuel system. Rules are based on standard fuel tank operating procedures described in the EECOM Console Handbook. The problem of configuring the operation of the Space Shuttle's fuel tanks is well-bounded and well defined. Moreover, the solution of this problem can be encoded in a knowledge-based system. Therefore, a rule-based expert system is the appropriate paradigm. Furthermore, the expert system could be used in coordination with power system simulation software to design operating procedures for specific missions.
NASA Technical Reports Server (NTRS)
Dietz, J. B.
1976-01-01
A flash evaporator heat rejection system representative of that proposed for the space shuttle orbiter underwent extensive system testing at the NASA Johnson Space Center (JSC) to determine its operational suitability and to establish system performance/operational characteristics for use in the shuttle system. During the tests the evaporator system demonstrated its suitability to meet the shuttle requirements by: (1) efficient operation with 90 to 95% water evaporation efficiency, (2) control of outlet temperature to 40 + or - 2 F for partial heat load operation, (3) stability of control system for rapid changes in Freon inlet temperature, and (4) repeated dormant-to-active device operation without any startup procedures.
Yamamoto, K; Ogura, H; Furutani, H; Kitazoe, Y; Takeda, Y; Hirakawa, M
1986-01-01
A computer system operation is introduced, which has been in use since October 1981 at Kochi medical school as one of the integral sub-systems of the total hospital information system called IMIS. The system was designed from the beginning with the main purposes of obtaining better management of operations, and detailed medical records are included for before, during and after operations. It is shown that almost all operations except emergencies were managed using the computer system rather than the paper system. After presenting some of the results of the accumulated records we will discuss the reason for this high frequency of use of the computer system.
The embedded operating system project
NASA Technical Reports Server (NTRS)
Campbell, R. H.
1985-01-01
The design and construction of embedded operating systems for real-time advanced aerospace applications was investigated. The applications require reliable operating system support that must accommodate computer networks. Problems that arise in the construction of such operating systems, reconfiguration, consistency and recovery in a distributed system, and the issues of real-time processing are reported. A thesis that provides theoretical foundations for the use of atomic actions to support fault tolerance and data consistency in real-time object-based system is included. The following items are addressed: (1) atomic actions and fault-tolerance issues; (2) operating system structure; (3) program development; (4) a reliable compiler for path Pascal; and (5) mediators, a mechanism for scheduling distributed system processes.
Ji, Hyerim; Yoo, Sooyoung; Heo, Eun-Young; Hwang, Hee; Kim, Jeong-Whun
2017-10-01
This study aimed to identify problems and issues that arise with the implementation of online health information exchange (HIE) systems in a medical environment and to identify solutions to facilitate the successful operation of future HIE systems in primary care clinics and hospitals. In this study, the issues that arose during the establishment and operation of an HIE system in a hospital were identified so that they could be addressed to enable the successful establishment and operation of a standard-based HIE system. After the issues were identified, they were reviewed and categorized by a group of experts that included medical information system experts, doctors, medical information standard experts, and HIE researchers. Then, solutions for the identified problems were derived based on the system development, operation, and improvement carried out during this work. Twenty-one issues were identified during the implementation and operation of an online HIE system. These issues were then divided into four categories: system architecture and standards, documents and data items, consent of HIE, and usability. We offer technical and policy recommendations for various stakeholders based on the experiences of operating and improving the online HIE system in the medical field. The issues and solutions identified in this study regarding the implementation and operate of an online HIE system can provide valuable insight for planners to enable them to successfully design and operate such systems at a national level in the future. In addition, policy support from governments is needed.
ERIC Educational Resources Information Center
Denning, Peter J.; Brown, Robert L.
1984-01-01
A computer operating system spans multiple layers of complexity, from commands entered at a keyboard to the details of electronic switching. In addition, the system is organized as a hierarchy of abstractions. Various parts of such a system and system dynamics (using the Unix operating system as an example) are described. (JN)
14 CFR 415.127 - Flight safety system design and operation data.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Expendable Launch Vehicle From a Non-Federal Launch Site § 415.127 Flight safety system design and operation...: flight termination system; command control system; tracking; telemetry; communications; flight safety... control system. (7) Flight termination system component storage, operating, and service life. A listing of...
NASA Astrophysics Data System (ADS)
Gao, Jie; Zheng, Jianrong; Zhao, Yinghui
2017-08-01
With the rapid development of LNG vehicle in China, the operator's training and assessment of the operating skills cannot operate on material objects, because of Vehicle Gas Cylinder's high pressure, flammable and explosive characteristics. LNG Vehicle Gas Cylinder's filling simulation system with semi-physical simulation technology presents the overall design and procedures of the simulation system, and elaborates the realization of the practical analog machine, data acquisition and control system and the computer software, and introduces the design process of equipment simulation model in detail. According to the designed assessment system of the Vehicle Gas Cylinder, it can obtain the operation on the actual cylinder filling and visual effects for the operator, and automatically record operation, the results of real operation with its software, and achieve the operators' training and assessment of operating skills on mobile special equipment.
Code of Federal Regulations, 2014 CFR
2014-04-01
... through the One-Stop delivery system and the operating costs of the system to be funded? 662.270 Section... and the operating costs of the system to be funded? The MOU must describe the particular funding arrangements for services and operating costs of the One-Stop delivery system. Each partner must contribute a...
Code of Federal Regulations, 2013 CFR
2013-04-01
... through the One-Stop delivery system and the operating costs of the system to be funded? 662.270 Section... and the operating costs of the system to be funded? The MOU must describe the particular funding arrangements for services and operating costs of the One-Stop delivery system. Each partner must contribute a...
Code of Federal Regulations, 2011 CFR
2011-04-01
... through the One-Stop delivery system and the operating costs of the system to be funded? 662.270 Section... and the operating costs of the system to be funded? The MOU must describe the particular funding arrangements for services and operating costs of the One-Stop delivery system. Each partner must contribute a...
Code of Federal Regulations, 2013 CFR
2013-10-01
... public entities operating fixed route systems. 37.71 Section 37.71 Transportation Office of the Secretary... operating fixed route systems. (a) Each public entity operating a fixed route system making a solicitation after August 25, 1990, to purchase or lease a new bus or other new vehicle for use on the system, shall...
Code of Federal Regulations, 2012 CFR
2012-10-01
... public entities operating fixed route systems. 37.71 Section 37.71 Transportation Office of the Secretary... operating fixed route systems. (a) Each public entity operating a fixed route system making a solicitation after August 25, 1990, to purchase or lease a new bus or other new vehicle for use on the system, shall...
Code of Federal Regulations, 2014 CFR
2014-10-01
... public entities operating fixed route systems. 37.71 Section 37.71 Transportation Office of the Secretary... operating fixed route systems. (a) Each public entity operating a fixed route system making a solicitation after August 25, 1990, to purchase or lease a new bus or other new vehicle for use on the system, shall...
Code of Federal Regulations, 2010 CFR
2010-04-01
... through the One-Stop delivery system and the operating costs of the system to be funded? 662.270 Section... and the operating costs of the system to be funded? The MOU must describe the particular funding arrangements for services and operating costs of the One-Stop delivery system. Each partner must contribute a...
Code of Federal Regulations, 2012 CFR
2012-04-01
... through the One-Stop delivery system and the operating costs of the system to be funded? 662.270 Section... and the operating costs of the system to be funded? The MOU must describe the particular funding arrangements for services and operating costs of the One-Stop delivery system. Each partner must contribute a...
Karimi, D; Henry, J; Mann, D D
2012-10-01
Tractor operators are prone to neck and back discomfort and disorders. It is well known that awkward posture is a major contributor to this problem. Previous studies have investigated the prevalence of awkward posture and the resulting discomfort and disorders among tractor operators. They have also suggested various ways to mitigate this problem. With the introduction of new autosteer guidance systems, the tractor operator is relieved from the task of steering the tractor for most of the time during field work. Therefore, it is expected that the operator's posture will change. The goal of this study was to investigate the changes in the eye-glance behavior and posture of tractor operators as a result of using autosteer guidance systems. An eye-tracking system and a camcorder were used to record the eye-glance behavior and posture of 13 tractor operators as they performed seeding operations. The experiment with each operator consisted of two sessions. In one session, the operator used an autosteer system, while in the other session the operator steered the tractor manually. Analysis of the data showed that the eye-glance behavior and posture of the operators were significantly different between the autosteer and manual steering sessions. With the autosteer system, the operators spent less time in an awkward posture, and they changed their posture less frequently. However, even with the autosteer system, the operators spent 1/3 of their time in an awkward posture. Subjective feedback from the operators indicated that more than half of them experienced back or neck/shoulder discomfort during or after seeding. It is essential that the recommendations of the previous studies, such as using large rear-view mirrors or a rotating tractor seat, be evaluated when the operator is using an autosteer system. Other tools, such as video cameras that show the attached equipment, should also be tested to evaluate their effectiveness in reducing the operator's exposure to awkward postures.
Building a computer-aided design capability using a standard time share operating system
NASA Technical Reports Server (NTRS)
Sobieszczanski, J.
1975-01-01
The paper describes how an integrated system of engineering computer programs can be built using a standard commercially available operating system. The discussion opens with an outline of the auxiliary functions that an operating system can perform for a team of engineers involved in a large and complex task. An example of a specific integrated system is provided to explain how the standard operating system features can be used to organize the programs into a simple and inexpensive but effective system. Applications to an aircraft structural design study are discussed to illustrate the use of an integrated system as a flexible and efficient engineering tool. The discussion concludes with an engineer's assessment of an operating system's capabilities and desirable improvements.
UNIX-based operating systems robustness evaluation
NASA Technical Reports Server (NTRS)
Chang, Yu-Ming
1996-01-01
Robust operating systems are required for reliable computing. Techniques for robustness evaluation of operating systems not only enhance the understanding of the reliability of computer systems, but also provide valuable feed- back to system designers. This thesis presents results from robustness evaluation experiments on five UNIX-based operating systems, which include Digital Equipment's OSF/l, Hewlett Packard's HP-UX, Sun Microsystems' Solaris and SunOS, and Silicon Graphics' IRIX. Three sets of experiments were performed. The methodology for evaluation tested (1) the exception handling mechanism, (2) system resource management, and (3) system capacity under high workload stress. An exception generator was used to evaluate the exception handling mechanism of the operating systems. Results included exit status of the exception generator and the system state. Resource management techniques used by individual operating systems were tested using programs designed to usurp system resources such as physical memory and process slots. Finally, the workload stress testing evaluated the effect of the workload on system performance by running a synthetic workload and recording the response time of local and remote user requests. Moderate to severe performance degradations were observed on the systems under stress.
Supporting Operational Data Assimilation Capabilities to the Research Community
NASA Astrophysics Data System (ADS)
Shao, H.; Hu, M.; Stark, D. R.; Zhou, C.; Beck, J.; Ge, G.
2017-12-01
The Developmental Testbed Center (DTC), in partnership with the National Centers for Environmental Prediction (NCEP) and other operational and research institutions, provides operational data assimilation capabilities to the research community and helps transition research advances to operations. The primary data assimilation system supported currently by the DTC is the Gridpoint Statistical Interpolation (GSI) system and the National Oceanic and Atmospheric Administration (NOAA) Ensemble Kalman Filter (EnKF) system. GSI is a variational based system being used for daily operations at NOAA, NCEP, the National Aeronautics and Space Administration, and other operational agencies. Recently, GSI has evolved into a four-dimensional EnVar system. Since 2009, the DTC has been releasing the GSI code to the research community annually and providing user support. In addition to GSI, the DTC, in 2015, began supporting the ensemble based EnKF data assimilation system. EnKF shares the observation operator with GSI and therefore, just as GSI, can assimilate both conventional and non-conventional data (e.g., satellite radiance). Currently, EnKF is being implemented as part of the GSI based hybrid EnVar system for NCEP Global Forecast System operations. This paper will summarize the current code management and support framework for these two systems. Following that is a description of available community services and facilities. Also presented is the pathway for researchers to contribute their development to the daily operations of these data assimilation systems.
Mission operations concepts for Earth Observing System (EOS)
NASA Technical Reports Server (NTRS)
Kelly, Angelita C.; Taylor, Thomas D.; Hawkins, Frederick J.
1991-01-01
Mission operation concepts are described which are being used to evaluate and influence space and ground system designs and architectures with the goal of achieving successful, efficient, and cost-effective Earth Observing System (EOS) operations. Emphasis is given to the general characteristics and concepts developed for the EOS Space Measurement System, which uses a new series of polar-orbiting observatories. Data rates are given for various instruments. Some of the operations concepts which require a total system view are also examined, including command operations, data processing, data accountability, data archival, prelaunch testing and readiness, launch, performance monitoring and assessment, contingency operations, flight software maintenance, and security.
Operation quality assessment model for video conference system
NASA Astrophysics Data System (ADS)
Du, Bangshi; Qi, Feng; Shao, Sujie; Wang, Ying; Li, Weijian
2018-01-01
Video conference system has become an important support platform for smart grid operation and management, its operation quality is gradually concerning grid enterprise. First, the evaluation indicator system covering network, business and operation maintenance aspects was established on basis of video conference system's operation statistics. Then, the operation quality assessment model combining genetic algorithm with regularized BP neural network was proposed, which outputs operation quality level of the system within a time period and provides company manager with some optimization advice. The simulation results show that the proposed evaluation model offers the advantages of fast convergence and high prediction accuracy in contrast with regularized BP neural network, and its generalization ability is superior to LM-BP neural network and Bayesian BP neural network.
14 CFR 27.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems with features conducive to... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system hot weather operation. 27.961...
14 CFR 27.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems with features conducive to... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Fuel system hot weather operation. 27.961...
14 CFR 29.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems conducive to vapor... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel system hot weather operation. 29.961...
14 CFR 27.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems with features conducive to... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel system hot weather operation. 27.961...
14 CFR 27.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems with features conducive to... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fuel system hot weather operation. 27.961...
14 CFR 29.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems conducive to vapor... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Fuel system hot weather operation. 29.961...
14 CFR 27.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Powerplant Fuel System § 27.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems with features conducive to... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel system hot weather operation. 27.961...
14 CFR 29.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems conducive to vapor... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel system hot weather operation. 29.961...
14 CFR 29.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems conducive to vapor... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system hot weather operation. 29.961...
14 CFR 29.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Powerplant Fuel System § 29.961 Fuel system hot weather operation. Each suction lift fuel system and other fuel systems conducive to vapor... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fuel system hot weather operation. 29.961...
32 CFR 310.33 - New and altered record systems.
Code of Federal Regulations, 2010 CFR
2010-07-01
... system will be reinstated or reused, the system may not be operated (i.e., information collected or used... direct access is an alteration. (ii) Software applications, such as operating systems and system... capacity of the current operating system and existing security is preserved. (vi) The connecting of two or...
32 CFR 310.33 - New and altered record systems.
Code of Federal Regulations, 2014 CFR
2014-07-01
... system will be reinstated or reused, the system may not be operated (i.e., information collected or used... direct access is an alteration. (ii) Software applications, such as operating systems and system... capacity of the current operating system and existing security is preserved. (vi) The connecting of two or...
32 CFR 310.33 - New and altered record systems.
Code of Federal Regulations, 2011 CFR
2011-07-01
... system will be reinstated or reused, the system may not be operated (i.e., information collected or used... direct access is an alteration. (ii) Software applications, such as operating systems and system... capacity of the current operating system and existing security is preserved. (vi) The connecting of two or...
32 CFR 310.33 - New and altered record systems.
Code of Federal Regulations, 2013 CFR
2013-07-01
... system will be reinstated or reused, the system may not be operated (i.e., information collected or used... direct access is an alteration. (ii) Software applications, such as operating systems and system... capacity of the current operating system and existing security is preserved. (vi) The connecting of two or...
32 CFR 310.33 - New and altered record systems.
Code of Federal Regulations, 2012 CFR
2012-07-01
... system will be reinstated or reused, the system may not be operated (i.e., information collected or used... direct access is an alteration. (ii) Software applications, such as operating systems and system... capacity of the current operating system and existing security is preserved. (vi) The connecting of two or...
Third International Symposium on Space Mission Operations and Ground Data Systems, part 2
NASA Technical Reports Server (NTRS)
Rash, James L. (Editor)
1994-01-01
Under the theme of 'Opportunities in Ground Data Systems for High Efficiency Operations of Space Missions,' the SpaceOps '94 symposium included presentations of more than 150 technical papers spanning five topic areas: Mission Management, Operations, Data Management, System Development, and Systems Engineering. The symposium papers focus on improvements in the efficiency, effectiveness, and quality of data acquisition, ground systems, and mission operations. New technology, methods, and human systems are discussed. Accomplishments are also reported in the application of information systems to improve data retrieval, reporting, and archiving; the management of human factors; the use of telescience and teleoperations; and the design and implementation of logistics support for mission operations. This volume covers expert systems, systems development tools and approaches, and systems engineering issues.
MATH77 - A LIBRARY OF MATHEMATICAL SUBPROGRAMS FOR FORTRAN 77, RELEASE 4.0
NASA Technical Reports Server (NTRS)
Lawson, C. L.
1994-01-01
MATH77 is a high quality library of ANSI FORTRAN 77 subprograms implementing contemporary algorithms for the basic computational processes of science and engineering. The portability of MATH77 meets the needs of present-day scientists and engineers who typically use a variety of computing environments. Release 4.0 of MATH77 contains 454 user-callable and 136 lower-level subprograms. Usage of the user-callable subprograms is described in 69 sections of the 416 page users' manual. The topics covered by MATH77 are indicated by the following list of chapter titles in the users' manual: Mathematical Functions, Pseudo-random Number Generation, Linear Systems of Equations and Linear Least Squares, Matrix Eigenvalues and Eigenvectors, Matrix Vector Utilities, Nonlinear Equation Solving, Curve Fitting, Table Look-Up and Interpolation, Definite Integrals (Quadrature), Ordinary Differential Equations, Minimization, Polynomial Rootfinding, Finite Fourier Transforms, Special Arithmetic , Sorting, Library Utilities, Character-based Graphics, and Statistics. Besides subprograms that are adaptations of public domain software, MATH77 contains a number of unique packages developed by the authors of MATH77. Instances of the latter type include (1) adaptive quadrature, allowing for exceptional generality in multidimensional cases, (2) the ordinary differential equations solver used in spacecraft trajectory computation for JPL missions, (3) univariate and multivariate table look-up and interpolation, allowing for "ragged" tables, and providing error estimates, and (4) univariate and multivariate derivative-propagation arithmetic. MATH77 release 4.0 is a subroutine library which has been carefully designed to be usable on any computer system that supports the full ANSI standard FORTRAN 77 language. It has been successfully implemented on a CRAY Y/MP computer running UNICOS, a UNISYS 1100 computer running EXEC 8, a DEC VAX series computer running VMS, a Sun4 series computer running SunOS, a Hewlett-Packard 720 computer running HP-UX, a Macintosh computer running MacOS, and an IBM PC compatible computer running MS-DOS. Accompanying the library is a set of 196 "demo" drivers that exercise all of the user-callable subprograms. The FORTRAN source code for MATH77 comprises 109K lines of code in 375 files with a total size of 4.5Mb. The demo drivers comprise 11K lines of code and 418K. Forty-four percent of the lines of the library code and 29% of those in the demo code are comment lines. The standard distribution medium for MATH77 is a .25 inch streaming magnetic tape cartridge in UNIX tar format. It is also available on a 9track 1600 BPI magnetic tape in VAX BACKUP format and a TK50 tape cartridge in VAX BACKUP format. An electronic copy of the documentation is included on the distribution media. Previous releases of MATH77 have been used over a number of years in a variety of JPL applications. MATH77 Release 4.0 was completed in 1992. MATH77 is a copyrighted work with all copyright vested in NASA.
Space-based solar power conversion and delivery systems (study), engineering analysis
NASA Technical Reports Server (NTRS)
Nathan, C. A.
1975-01-01
A systems analysis of synchronous, orbit-based power generation and relay systems that could be operational in the 1990's is described along with a comparison with earth-based systems to be operational in the same time frame. Operational and economic requirements for the orbiting systems and near term research activities which will be required to assure feasibility, development, launch and operational capabilities of such systems in the post- 1990 time frame are examined.
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 6 2014-07-01 2014-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
Code of Federal Regulations, 2012 CFR
2012-10-01
... distribution systems. (a) No person may operate a low-pressure distribution system at a pressure high enough to...) No person may operate a low pressure distribution system at a pressure lower than the minimum... 49 Transportation 3 2012-10-01 2012-10-01 false Maximum and minimum allowable operating pressure...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 6 2011-07-01 2011-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
Code of Federal Regulations, 2011 CFR
2011-10-01
... distribution systems. (a) No person may operate a low-pressure distribution system at a pressure high enough to...) No person may operate a low pressure distribution system at a pressure lower than the minimum... 49 Transportation 3 2011-10-01 2011-10-01 false Maximum and minimum allowable operating pressure...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 6 2010-07-01 2010-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 6 2012-07-01 2012-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
Code of Federal Regulations, 2013 CFR
2013-10-01
... distribution systems. (a) No person may operate a low-pressure distribution system at a pressure high enough to...) No person may operate a low pressure distribution system at a pressure lower than the minimum... 49 Transportation 3 2013-10-01 2013-10-01 false Maximum and minimum allowable operating pressure...
Code of Federal Regulations, 2014 CFR
2014-10-01
... distribution systems. (a) No person may operate a low-pressure distribution system at a pressure high enough to...) No person may operate a low pressure distribution system at a pressure lower than the minimum... 49 Transportation 3 2014-10-01 2014-10-01 false Maximum and minimum allowable operating pressure...
32 CFR 806b.6 - Systems of records operated by a contractor.
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 6 2013-07-01 2013-07-01 false Systems of records operated by a contractor... ADMINISTRATION PRIVACY ACT PROGRAM Overview of the Privacy Act Program § 806b.6 Systems of records operated by a contractor. Contractors who are required to operate or maintain a Privacy Act system of records by contract...
Code of Federal Regulations, 2014 CFR
2014-07-01
... capture system and add-on control device operating limits during the performance test? 63.4966 Section 63... system and add-on control device operating limits during the performance test? During the performance... outlet gas temperature is the maximum operating limit for your condenser. (e) Emission capture system...
Code of Federal Regulations, 2010 CFR
2010-10-01
... distribution systems. (a) No person may operate a low-pressure distribution system at a pressure high enough to...) No person may operate a low pressure distribution system at a pressure lower than the minimum... 49 Transportation 3 2010-10-01 2010-10-01 false Maximum and minimum allowable operating pressure...
Code of Federal Regulations, 2012 CFR
2012-07-01
... capture system and add-on control device operating limits during the performance test? 63.4966 Section 63... system and add-on control device operating limits during the performance test? During the performance... outlet gas temperature is the maximum operating limit for your condenser. (e) Emission capture system...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
... New York Independent System Operator, Inc.; and In the Matter of the Petition for an Exemptive Order... Independent System Operator (``CAISO'') and New York Independent System Operator (``NYISO'')), whose central... Commodity Exchange Act by ISO New England Inc.; In the Matter of the Petition for an Exemptive Order Under...
User interface and operational issues with thermionic space power systems
NASA Technical Reports Server (NTRS)
Dahlberg, R. C.; Fisher, C. R.
1987-01-01
Thermionic space power systems have unique features which facilitate predeployment operations, provide operational flexibility and simplify the interface with the user. These were studied in some detail during the SP-100 program from 1983 to 1985. Three examples are reviewed in this paper: (1) system readiness verification in the prelaunch phase; (2) startup, shutdown, and dormancy in the operations phase; (3) part-load operation in the operations phase.
NASA Technical Reports Server (NTRS)
Harmon, Timothy J.
1992-01-01
This document is the final report for the Space Transfer Propulsion Operational Efficiency Study Task of the Operationally Efficient Propulsion System Study (OEPSS) conducted by the Rocketdyne Division of Rockwell International. This Study task studied, evaluated and identified design concepts and technologies which minimized launch and in-space operations and optimized in-space vehicle propulsion system operability.
Operating System Abstraction Layer (OSAL)
NASA Technical Reports Server (NTRS)
Yanchik, Nicholas J.
2007-01-01
This viewgraph presentation reviews the concept of the Operating System Abstraction Layer (OSAL) and its benefits. The OSAL is A small layer of software that allows programs to run on many different operating systems and hardware platforms It runs independent of the underlying OS & hardware and it is self-contained. The benefits of OSAL are that it removes dependencies from any one operating system, promotes portable, reusable flight software. It allows for Core Flight software (FSW) to be built for multiple processors and operating systems. The presentation discusses the functionality, the various OSAL releases, and describes the specifications.
Achieving Operability via the Mission System Paradigm
NASA Technical Reports Server (NTRS)
Hammer, Fred J.; Kahr, Joseph R.
2006-01-01
In the past, flight and ground systems have been developed largely-independently, with the flight system taking the lead, and dominating the development process. Operability issues have been addressed poorly in planning, requirements, design, I&T, and system-contracting activities. In many cases, as documented in lessons-learned, this has resulted in significant avoidable increases in cost and risk. With complex missions and systems, operability is being recognized as an important end-to-end design issue. Never-the-less, lessons-learned and operability concepts remain, in many cases, poorly understood and sporadically applied. A key to effective application of operability concepts is adopting a 'mission system' paradigm. In this paradigm, flight and ground systems are treated, from an engineering and management perspective, as inter-related elements of a larger mission system. The mission system consists of flight hardware, flight software, telecom services, ground data system, testbeds, flight teams, science teams, flight operations processes, procedures, and facilities. The system is designed in functional layers, which span flight and ground. It is designed in response to project-level requirements, mission design and an operations concept, and is developed incrementally, with early and frequent integration of flight and ground components.
14 CFR 121.313 - Miscellaneous equipment.
Code of Federal Regulations, 2010 CFR
2010-01-01
... from its primary operating system to an alternate system, the means must include a positive positioning...) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS OPERATING... equivalent for each pilot station. (c) A power supply and distribution system that meets the requirements of...
14 CFR 121.313 - Miscellaneous equipment.
Code of Federal Regulations, 2012 CFR
2012-01-01
... from its primary operating system to an alternate system, the means must include a positive positioning...) AIR CARRIERS AND OPERATORS FOR COMPENSATION OR HIRE: CERTIFICATION AND OPERATIONS OPERATING... equivalent for each pilot station. (c) A power supply and distribution system that meets the requirements of...
A Comprehensive Comparison of Current Operating Reserve Methodologies
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krad, Ibrahim; Ibanez, Eduardo; Gao, Wenzhong
Electric power systems are currently experiencing a paradigm shift from a traditionally static system to a system that is becoming increasingly more dynamic and variable. Emerging technologies are forcing power system operators to adapt to their performance characteristics. These technologies, such as distributed generation and energy storage systems, have changed the traditional idea of a distribution system with power flowing in one direction into a distribution system with bidirectional flows. Variable generation, in the form of wind and solar generation, also increases the variability and uncertainty in the system. As such, power system operators are revisiting the ways in whichmore » they treat this evolving power system, namely by modifying their operating reserve methodologies. This paper intends to show an in-depth analysis on different operating reserve methodologies and investigate their impacts on power system reliability and economic efficiency.« less
THERMAL DESIGN OF THE ITER VACUUM VESSEL COOLING SYSTEM
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carbajo, Juan J; Yoder Jr, Graydon L; Kim, Seokho H
RELAP5-3D models of the ITER Vacuum Vessel (VV) Primary Heat Transfer System (PHTS) have been developed. The design of the cooling system is described in detail, and RELAP5 results are presented. Two parallel pump/heat exchanger trains comprise the design one train is for full-power operation and the other is for emergency operation or operation at decay heat levels. All the components are located inside the Tokamak building (a significant change from the original configurations). The results presented include operation at full power, decay heat operation, and baking operation. The RELAP5-3D results confirm that the design can operate satisfactorily during bothmore » normal pulsed power operation and decay heat operation. All the temperatures in the coolant and in the different system components are maintained within acceptable operating limits.« less
Solar power satellite system definition study. Volume 3: Operations and systems synthesis, phase 2
NASA Technical Reports Server (NTRS)
1979-01-01
The results of the operations analyses are reported. Some of these analyses examined operations aspects of space vehicle in-space maintenance. Many of the analyses explored in great depth operations concerned the LEO Base cargo handling operations. Personnel transportation operations and cargo packaging were also analyzed. These operations analyses were performed to define the operational requirements for all of the SPS system elements so that equipment and facilities could be synthesized, and to make estimates of the manpower requirements. An overall, integrated, end-to-end description of the SPS operations is presented. The detailed operations analyses, upon which this integrated description was based, are included.
NASA Technical Reports Server (NTRS)
Campbell, R. H.; Essick, R. B.; Grass, J.; Johnston, G.; Kenny, K.; Russo, V.
1986-01-01
The EOS project is investigating the design and construction of a family of real-time distributed embedded operating systems for reliable, distributed aerospace applications. Using the real-time programming techniques developed in co-operation with NASA in earlier research, the project staff is building a kernel for a multiple processor networked system. The first six months of the grant included a study of scheduling in an object-oriented system, the design philosophy of the kernel, and the architectural overview of the operating system. In this report, the operating system and kernel concepts are described. An environment for the experiments has been built and several of the key concepts of the system have been prototyped. The kernel and operating system is intended to support future experimental studies in multiprocessing, load-balancing, routing, software fault-tolerance, distributed data base design, and real-time processing.
1994-04-18
because they represent a microkernel and monolithic kernel approach to MLS operating system issues. TMACH is I based on MACH, a distributed operating...the operating system is [L.sed on a microkernel design or a monolithic kernel design. This distinction requires some caution since monolithic operating...are provided by 3 user-level processes, in contrast to standard UNIX, which has a large monolithic kernel that pro- I - 22 - Distributed O)perating
Development of wide area environment accelerator operation and diagnostics method
NASA Astrophysics Data System (ADS)
Uchiyama, Akito; Furukawa, Kazuro
2015-08-01
Remote operation and diagnostic systems for particle accelerators have been developed for beam operation and maintenance in various situations. Even though fully remote experiments are not necessary, the remote diagnosis and maintenance of the accelerator is required. Considering remote-operation operator interfaces (OPIs), the use of standard protocols such as the hypertext transfer protocol (HTTP) is advantageous, because system-dependent protocols are unnecessary between the remote client and the on-site server. Here, we have developed a client system based on WebSocket, which is a new protocol provided by the Internet Engineering Task Force for Web-based systems, as a next-generation Web-based OPI using the Experimental Physics and Industrial Control System Channel Access protocol. As a result of this implementation, WebSocket-based client systems have become available for remote operation. Also, as regards practical application, the remote operation of an accelerator via a wide area network (WAN) faces a number of challenges, e.g., the accelerator has both experimental device and radiation generator characteristics. Any error in remote control system operation could result in an immediate breakdown. Therefore, we propose the implementation of an operator intervention system for remote accelerator diagnostics and support that can obviate any differences between the local control room and remote locations. Here, remote-operation Web-based OPIs, which resolve security issues, are developed.
Operator Performance Support System (OPSS)
NASA Technical Reports Server (NTRS)
Conklin, Marlen Z.
1993-01-01
In the complex and fast reaction world of military operations, present technologies, combined with tactical situations, have flooded the operator with assorted information that he is expected to process instantly. As technologies progress, this flow of data and information have both guided and overwhelmed the operator. However, the technologies that have confounded many operators today can be used to assist him -- thus the Operator Performance Support Team. In this paper we propose an operator support station that incorporates the elements of Video and Image Databases, productivity Software, Interactive Computer Based Training, Hypertext/Hypermedia Databases, Expert Programs, and Human Factors Engineering. The Operator Performance Support System will provide the operator with an integrating on-line information/knowledge system that will guide expert or novice to correct systems operations. Although the OPSS is being developed for the Navy, the performance of the workforce in today's competitive industry is of major concern. The concepts presented in this paper which address ASW systems software design issues are also directly applicable to industry. the OPSS will propose practical applications in how to more closely align the relationships between technical knowledge and equipment operator performance.
Third International Symposium on Space Mission Operations and Ground Data Systems, part 1
NASA Technical Reports Server (NTRS)
Rash, James L. (Editor)
1994-01-01
Under the theme of 'Opportunities in Ground Data Systems for High Efficiency Operations of Space Missions,' the SpaceOps '94 symposium included presentations of more than 150 technical papers spanning five topic areas: Mission Management, Operations, Data Management, System Development, and Systems Engineering. The papers focus on improvements in the efficiency, effectiveness, productivity, and quality of data acquisition, ground systems, and mission operations. New technology, techniques, methods, and human systems are discussed. Accomplishments are also reported in the application of information systems to improve data retrieval, reporting, and archiving; the management of human factors; the use of telescience and teleoperations; and the design and implementation of logistics support for mission operations.
NASA Technical Reports Server (NTRS)
Watson, Michael D.; Kelley, Gary W.
2012-01-01
The Department of Defense (DoD) defined System Operational Effectiveness (SOE) model provides an exceptional framework for an affordable approach to the development and operation of space launch vehicles and their supporting infrastructure. The SOE model provides a focal point from which to direct and measure technical effectiveness and process efficiencies of space launch vehicles. The application of the SOE model to a space launch vehicle's development and operation effort leads to very specific approaches and measures that require consideration during the design phase. This paper provides a mapping of the SOE model to the development of space launch vehicles for human exploration by addressing the SOE model key points of measurement including System Performance, System Availability, Technical Effectiveness, Process Efficiency, System Effectiveness, Life Cycle Cost, and Affordable Operational Effectiveness. In addition, the application of the SOE model to the launch vehicle development process is defined providing the unique aspects of space launch vehicle production and operations in lieu of the traditional broader SOE context that examines large quantities of fielded systems. The tailoring and application of the SOE model to space launch vehicles provides some key insights into the operational design drivers, capability phasing, and operational support systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... operates rolling equipment on track that is part of the general railroad system of transportation; (2) Each... is part of the general railroad system of transportation, each carrier operating or providing... operating on or off the general railroad system of transportation; (7) Each operator of private cars...
75 FR 62476 - Ultra-Wideband Transmission Systems
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-12
... would be obtained from measurements taken with the system operating in its normal operating mode. At the... with the transmitter operating continuously at a fundamental transmission frequency. 9. Subsequent to... systems, measured in their normal operating modes, is less than that of a UWB transmitter employing...
A support architecture for reliable distributed computing systems
NASA Technical Reports Server (NTRS)
Dasgupta, Partha; Leblanc, Richard J., Jr.
1988-01-01
The Clouds project is well underway to its goal of building a unified distributed operating system supporting the object model. The operating system design uses the object concept of structuring software at all levels of the system. The basic operating system was developed and work is under progress to build a usable system.
NASA Technical Reports Server (NTRS)
Cullimore, B.
1994-01-01
SINDA, the Systems Improved Numerical Differencing Analyzer, is a software system for solving lumped parameter representations of physical problems governed by diffusion-type equations. SINDA was originally designed for analyzing thermal systems represented in electrical analog, lumped parameter form, although its use may be extended to include other classes of physical systems which can be modeled in this form. As a thermal analyzer, SINDA can handle such interrelated phenomena as sublimation, diffuse radiation within enclosures, transport delay effects, and sensitivity analysis. FLUINT, the FLUid INTegrator, is an advanced one-dimensional fluid analysis program that solves arbitrary fluid flow networks. The working fluids can be single phase vapor, single phase liquid, or two phase. The SINDA'85/FLUINT system permits the mutual influences of thermal and fluid problems to be analyzed. The SINDA system consists of a programming language, a preprocessor, and a subroutine library. The SINDA language is designed for working with lumped parameter representations and finite difference solution techniques. The preprocessor accepts programs written in the SINDA language and converts them into standard FORTRAN. The SINDA library consists of a large number of FORTRAN subroutines that perform a variety of commonly needed actions. The use of these subroutines can greatly reduce the programming effort required to solve many problems. A complete run of a SINDA'85/FLUINT model is a four step process. First, the user's desired model is run through the preprocessor which writes out data files for the processor to read and translates the user's program code. Second, the translated code is compiled. The third step requires linking the user's code with the processor library. Finally, the processor is executed. SINDA'85/FLUINT program features include 20,000 nodes, 100,000 conductors, 100 thermal submodels, and 10 fluid submodels. SINDA'85/FLUINT can also model two phase flow, capillary devices, user defined fluids, gravity and acceleration body forces on a fluid, and variable volumes. SINDA'85/FLUINT offers the following numerical solution techniques. The Finite difference formulation of the explicit method is the Forward-difference explicit approximation. The formulation of the implicit method is the Crank-Nicolson approximation. The program allows simulation of non-uniform heating and facilitates modeling thin-walled heat exchangers. The ability to model non-equilibrium behavior within two-phase volumes is included. Recent improvements to the program were made in modeling real evaporator-pumps and other capillary-assist evaporators. SINDA'85/FLUINT is available by license for a period of ten (10) years to approved licensees. The licensed program product includes the source code and one copy of the supporting documentation. Additional copies of the documentation may be purchased separately at any time. SINDA'85/FLUINT is written in FORTRAN 77. Version 2.3 has been implemented on Cray series computers running UNICOS, CONVEX computers running CONVEX OS, and DEC RISC computers running ULTRIX. Binaries are included with the Cray version only. The Cray version of SINDA'85/FLUINT also contains SINGE, an additional graphics program developed at Johnson Space Flight Center. Both source and executable code are provided for SINGE. Users wishing to create their own SINGE executable will also need the NASA Device Independent Graphics Library (NASADIG, previously known as SMDDIG; UNIX version, MSC-22001). The Cray and CONVEX versions of SINDA'85/FLUINT are available on 9-track 1600 BPI UNIX tar format magnetic tapes. The CONVEX version is also available on a .25 inch streaming magnetic tape cartridge in UNIX tar format. The DEC RISC ULTRIX version is available on a TK50 magnetic tape cartridge in UNIX tar format. SINDA was developed in 1971, and first had fluid capability added in 1975. SINDA'85/FLUINT version 2.3 was released in 1990.
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2014 CFR
2014-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2011 CFR
2011-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2010 CFR
2010-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2013 CFR
2013-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
14 CFR 29.1333 - Instrument systems.
Code of Federal Regulations, 2012 CFR
2012-01-01
.... For systems that operate the required flight instruments which are located at each pilot's station... that operating system. (b) The equipment, systems, and installations must be designed so that one... equipment may not be connected to the operating system for a second pilot unless provisions are made to...
49 CFR 234.257 - Warning system operation.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 49 Transportation 4 2012-10-01 2012-10-01 false Warning system operation. 234.257 Section 234.257... EMERGENCY NOTIFICATION SYSTEMS Maintenance, Inspection, and Testing Inspections and Tests § 234.257 Warning system operation. (a) Each highway-rail crossing warning system shall be tested to determine that it...
49 CFR 234.257 - Warning system operation.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 49 Transportation 4 2014-10-01 2014-10-01 false Warning system operation. 234.257 Section 234.257... EMERGENCY NOTIFICATION SYSTEMS Maintenance, Inspection, and Testing Inspections and Tests § 234.257 Warning system operation. (a) Each highway-rail crossing warning system shall be tested to determine that it...
49 CFR 234.257 - Warning system operation.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 49 Transportation 4 2013-10-01 2013-10-01 false Warning system operation. 234.257 Section 234.257... EMERGENCY NOTIFICATION SYSTEMS Maintenance, Inspection, and Testing Inspections and Tests § 234.257 Warning system operation. (a) Each highway-rail crossing warning system shall be tested to determine that it...
NASA Astrophysics Data System (ADS)
Kostyukov, V. N.; Naumenko, A. P.
2017-08-01
The paper dwells upon urgent issues of evaluating impact of actions conducted by complex technological systems operators on their safe operation considering application of condition monitoring systems for elements and sub-systems of petrochemical production facilities. The main task for the research is to distinguish factors and criteria of monitoring system properties description, which would allow to evaluate impact of errors made by personnel on operation of real-time condition monitoring and diagnostic systems for machinery of petrochemical facilities, and find and objective criteria for monitoring system class, considering a human factor. On the basis of real-time condition monitoring concepts of sudden failure skipping risk, static and dynamic error, monitoring systems, one may solve a task of evaluation of impact that personnel's qualification has on monitoring system operation in terms of error in personnel or operators' actions while receiving information from monitoring systems and operating a technological system. Operator is considered as a part of the technological system. Although, personnel's behavior is usually a combination of the following parameters: input signal - information perceiving, reaction - decision making, response - decision implementing. Based on several researches on behavior of nuclear powers station operators in USA, Italy and other countries, as well as on researches conducted by Russian scientists, required data on operator's reliability were selected for analysis of operator's behavior at technological facilities diagnostics and monitoring systems. The calculations revealed that for the monitoring system selected as an example, the failure skipping risk for the set values of static (less than 0.01) and dynamic (less than 0.001) errors considering all related factors of data on reliability of information perception, decision-making, and reaction fulfilled is 0.037, in case when all the facilities and error probability are under control - not more than 0.027. In case when only pump and compressor units are under control, the failure skipping risk is not more than 0.022, when the probability of error in operator's action is not more than 0.011. The work output shows that on the basis of the researches results an assessment of operators' reliability can be made in terms of almost any kind of production, but considering only technological capabilities, since operators' psychological and general training considerable vary in different production industries. Using latest technologies of engineering psychology and design of data support systems, situation assessment systems, decision-making and responding system, as well as achievement in condition monitoring in various production industries one can evaluate hazardous condition skipping risk probability considering static, dynamic errors and human factor.
Terminal-area STOL operating systems experiments program
NASA Technical Reports Server (NTRS)
Smith, D. W.; Watson, D.; Christensen, J. V.
1973-01-01
Information which will aid in the choice by the U.S. Government and industry of system concepts, design criteria, operating procedures for STOL aircraft and STOL ports, STOL landing guidance systems, air traffic control systems, and airborne avionics and flight control systems. Ames has developed a terminal-area STOL operating systems experiments program which is a part of the joint DOT/NASA effort is discussed. The Ames operating systems experiments program, its objectives, the program approach, the program schedule, typical experiments, the research facilities to be used, and the program status are described.
Measurement and analysis of operating system fault tolerance
NASA Technical Reports Server (NTRS)
Lee, I.; Tang, D.; Iyer, R. K.
1992-01-01
This paper demonstrates a methodology to model and evaluate the fault tolerance characteristics of operational software. The methodology is illustrated through case studies on three different operating systems: the Tandem GUARDIAN fault-tolerant system, the VAX/VMS distributed system, and the IBM/MVS system. Measurements are made on these systems for substantial periods to collect software error and recovery data. In addition to investigating basic dependability characteristics such as major software problems and error distributions, we develop two levels of models to describe error and recovery processes inside an operating system and on multiple instances of an operating system running in a distributed environment. Based on the models, reward analysis is conducted to evaluate the loss of service due to software errors and the effect of the fault-tolerance techniques implemented in the systems. Software error correlation in multicomputer systems is also investigated.
Code of Federal Regulations, 2013 CFR
2013-10-01
... public entities operating fixed route systems. 37.73 Section 37.73 Transportation Office of the Secretary... operating fixed route systems. (a) Except as provided elsewhere in this section, each public entity operating a fixed route system purchasing or leasing, after August 25, 1990, a used bus or other used...
Code of Federal Regulations, 2010 CFR
2010-10-01
... public entities operating fixed route systems. 37.73 Section 37.73 Transportation Office of the Secretary... operating fixed route systems. (a) Except as provided elsewhere in this section, each public entity operating a fixed route system purchasing or leasing, after August 25, 1990, a used bus or other used...
Code of Federal Regulations, 2013 CFR
2013-10-01
... lease of remanufactured non-rail vehicles by public entities operating fixed route systems. 37.75... operating fixed route systems. (a) This section applies to any public entity operating a fixed route system.... (d) If a public entity operates a fixed route system, any segment of which is included on the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... lease of remanufactured non-rail vehicles by public entities operating fixed route systems. 37.75... operating fixed route systems. (a) This section applies to any public entity operating a fixed route system.... (d) If a public entity operates a fixed route system, any segment of which is included on the...
Code of Federal Regulations, 2011 CFR
2011-10-01
... public entities operating fixed route systems. 37.73 Section 37.73 Transportation Office of the Secretary... operating fixed route systems. (a) Except as provided elsewhere in this section, each public entity operating a fixed route system purchasing or leasing, after August 25, 1990, a used bus or other used...
Code of Federal Regulations, 2010 CFR
2010-07-01
... system and add-on control device operating limits during the performance test? 63.3556 Section 63.3556... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure.../outlet Concentration Option § 63.3556 How do I establish the emission capture system and add-on control...
Code of Federal Regulations, 2014 CFR
2014-10-01
... public entities operating fixed route systems. 37.73 Section 37.73 Transportation Office of the Secretary... operating fixed route systems. (a) Except as provided elsewhere in this section, each public entity operating a fixed route system purchasing or leasing, after August 25, 1990, a used bus or other used...
Code of Federal Regulations, 2012 CFR
2012-10-01
... public entities operating fixed route systems. 37.73 Section 37.73 Transportation Office of the Secretary... operating fixed route systems. (a) Except as provided elsewhere in this section, each public entity operating a fixed route system purchasing or leasing, after August 25, 1990, a used bus or other used...
Code of Federal Regulations, 2011 CFR
2011-07-01
... system and add-on control device operating limits during the performance test? 63.3556 Section 63.3556... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure.../outlet Concentration Option § 63.3556 How do I establish the emission capture system and add-on control...
Code of Federal Regulations, 2013 CFR
2013-07-01
... system and add-on control device operating limits during the performance test? 63.3556 Section 63.3556... of key parameters of the valve operating system (e.g., solenoid valve operation, air pressure... Control Efficiency/outlet Concentration Option § 63.3556 How do I establish the emission capture system...
Code of Federal Regulations, 2012 CFR
2012-10-01
... lease of remanufactured non-rail vehicles by public entities operating fixed route systems. 37.75... operating fixed route systems. (a) This section applies to any public entity operating a fixed route system.... (d) If a public entity operates a fixed route system, any segment of which is included on the...
Code of Federal Regulations, 2010 CFR
2010-10-01
... lease of remanufactured non-rail vehicles by public entities operating fixed route systems. 37.75... operating fixed route systems. (a) This section applies to any public entity operating a fixed route system.... (d) If a public entity operates a fixed route system, any segment of which is included on the...
Code of Federal Regulations, 2014 CFR
2014-10-01
... lease of remanufactured non-rail vehicles by public entities operating fixed route systems. 37.75... operating fixed route systems. (a) This section applies to any public entity operating a fixed route system.... (d) If a public entity operates a fixed route system, any segment of which is included on the...
[The use of an opect optic system in neurosurgical practice].
Kalinovskiy, A V; Rzaev, D A; Yoshimitsu, K
2018-01-01
Modern neurosurgical practice is impossible without access to various information sources. The use of MRI and MSCT data during surgery is an integral part of the neurosurgeon's daily practice. Devices capable of managing an image viewer system without direct contact with equipment simplify working in the operating room. To test operation of a non-contact MRI and MSCT image viewer system in the operating room and to evaluate the system effectiveness. An Opect non-contact image management system developed at the Tokyo Women's Medical University was installed in one of the operating rooms of the Novosibirsk Federal Center of Neurosurgery in 2014. In 2015, the Opect system was used by operating surgeons in 73 surgeries performed in the same operating room. The system effectiveness was analyzed based on a survey of surgeons. The non-contact image viewer system occurred to be easy-to-learn for the personnel to operate this system, easy-to-manage it, and easy-to-present visual information during surgery. Application of the Opect system simplifies work with neuroimaging data during surgery. The surgeon can independently view series of relevant MRI and MSCT scans without any assistance.
RTEMS CENTRE- Support and Maintenance CENTRE to RTEMS Operating System
NASA Astrophysics Data System (ADS)
Silva, H.; Constantino, A.; Coutunho, M.; Freitas, D.; Faustino, S.; Mota, M.; Colaço, P.; Zulianello, M.
2008-08-01
RTEMS stands for Real-Time Operating System for Multiprocessor Systems. It is a full featured Real Time Operating System that supports a variety of open APIs and interface standards. It provides a high performance environment for embedded applications, including a fixed-priority preemptive/non-preemptive scheduler, a comprehensive set of multitasking operations and a large range of supported architectures. Support and maintenance CENTRE to RTEMS operating system (RTEMS CENTRE) is a joint initiative of ESA-Portugal Task force, aiming to build a strong technical competence in the space flight (on- board) software, to offer support, maintenance and improvements to RTEMS. This paper provides a high level description of the current and future activities of the RTEMS CENTRE. It presents a brief description of the RTEMS operating system, a description of the tools developed and distributed to the community [1] and the improvements to be made to the operating system, including facilitation for the qualification of RTEMS (4.8.0) [2] for the space missions.
Using task analysis to understand the Data System Operations Team
NASA Technical Reports Server (NTRS)
Holder, Barbara E.
1994-01-01
The Data Systems Operations Team (DSOT) currently monitors the Multimission Ground Data System (MGDS) at JPL. The MGDS currently supports five spacecraft and within the next five years, it will support ten spacecraft simultaneously. The ground processing element of the MGDS consists of a distributed UNIX-based system of over 40 nodes and 100 processes. The MGDS system provides operators with little or no information about the system's end-to-end processing status or end-to-end configuration. The lack of system visibility has become a critical issue in the daily operation of the MGDS. A task analysis was conducted to determine what kinds of tools were needed to provide DSOT with useful status information and to prioritize the tool development. The analysis provided the formality and structure needed to get the right information exchange between development and operations. How even a small task analysis can improve developer-operator communications is described, and the challenges associated with conducting a task analysis in a real-time mission operations environment are examined.
47 CFR 73.62 - Directional antenna system operation and tolerances.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 4 2010-10-01 2010-10-01 false Directional antenna system operation and... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.62 Directional antenna system operation and tolerances. (a) Each AM station operating a directional antenna must maintain the relative...
47 CFR 73.62 - Directional antenna system operation and tolerances.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 4 2012-10-01 2012-10-01 false Directional antenna system operation and... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.62 Directional antenna system operation and tolerances. (a) Each AM station operating a directional antenna must maintain the relative...
47 CFR 73.62 - Directional antenna system operation and tolerances.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 4 2014-10-01 2014-10-01 false Directional antenna system operation and... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.62 Directional antenna system operation and tolerances. (a) Each AM station operating a directional antenna must maintain the relative...
47 CFR 73.62 - Directional antenna system operation and tolerances.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 4 2011-10-01 2011-10-01 false Directional antenna system operation and... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.62 Directional antenna system operation and tolerances. (a) Each AM station operating a directional antenna must maintain the relative...
47 CFR 73.62 - Directional antenna system operation and tolerances.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 4 2013-10-01 2013-10-01 false Directional antenna system operation and... RADIO SERVICES RADIO BROADCAST SERVICES AM Broadcast Stations § 73.62 Directional antenna system operation and tolerances. (a) Each AM station operating a directional antenna must maintain the relative...
Code of Federal Regulations, 2013 CFR
2013-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Records Required To Be Maintained By Operators of Credit Card Systems § 1028.400 General. Operators of credit card.... Operators of credit card systems should also refer to Subpart D of Part 1010 of this Chapter for...
Code of Federal Regulations, 2012 CFR
2012-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Records Required To Be Maintained By Operators of Credit Card Systems § 1028.400 General. Operators of credit card.... Operators of credit card systems should also refer to Subpart D of Part 1010 of this Chapter for...
Code of Federal Regulations, 2011 CFR
2011-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Records Required To Be Maintained By Operators of Credit Card Systems § 1028.400 General. Operators of credit card.... Operators of credit card systems should also refer to Subpart D of Part 1010 of this Chapter for...
Code of Federal Regulations, 2014 CFR
2014-07-01
... ENFORCEMENT NETWORK, DEPARTMENT OF THE TREASURY RULES FOR OPERATORS OF CREDIT CARD SYSTEMS Records Required To Be Maintained By Operators of Credit Card Systems § 1028.400 General. Operators of credit card.... Operators of credit card systems should also refer to Subpart D of Part 1010 of this Chapter for...
Managing computer-controlled operations
NASA Technical Reports Server (NTRS)
Plowden, J. B.
1985-01-01
A detailed discussion of Launch Processing System Ground Software Production is presented to establish the interrelationships of firing room resource utilization, configuration control, system build operations, and Shuttle data bank management. The production of a test configuration identifier is traced from requirement generation to program development. The challenge of the operational era is to implement fully automated utilities to interface with a resident system build requirements document to eliminate all manual intervention in the system build operations. Automatic update/processing of Shuttle data tapes will enhance operations during multi-flow processing.
A NASPAC-Based Analysis of the Delay and Cost Effects of the Dallas/Fort Worth Metroplex Plan
1992-10-01
Federal Aviation Administration Operations Research Service 14. Sponsoring Agency Code Washington, DC 20590 AOR-100 15. Supplementary Notes 16 . Abstract...LIST OF ILLUSTRATIONS Figure Page 1 DFW Area Airports 3 2 Forecasted Number of Daily Operations at DFW 12 3 Annual Savings at DFW with the Plan 16 4...Increase in System Operational Delay Without Plan 24 15 Average System Operational Delay 26 16 System Operational Delay Savings with Plan 26 17 System
NASA Technical Reports Server (NTRS)
1982-01-01
The Space Operations Center (SOC) orbital space station research missions integration, crew requirements, SOC operations, and configurations are analyzed. Potential research and applications missions and their requirements are described. The capabilities of SOC are compared with user requirements. The SOC/space shuttle and shuttle-derived vehicle flight support operations and SOC orbital operations are described. Module configurations and systems options, SOC/external tank configurations, and configurations for geostationary orbits are described. Crew and systems safety configurations are summarized.
Intelligent Operation and Maintenance of Micro-grid Technology and System Development
NASA Astrophysics Data System (ADS)
Fu, Ming; Song, Jinyan; Zhao, Jingtao; Du, Jian
2018-01-01
In order to achieve the micro-grid operation and management, Studying the micro-grid operation and maintenance knowledge base. Based on the advanced Petri net theory, the fault diagnosis model of micro-grid is established, and the intelligent diagnosis and analysis method of micro-grid fault is put forward. Based on the technology, the functional system and architecture of the intelligent operation and maintenance system of micro-grid are studied, and the microcomputer fault diagnosis function is introduced in detail. Finally, the system is deployed based on the micro-grid of a park, and the micro-grid fault diagnosis and analysis is carried out based on the micro-grid operation. The system operation and maintenance function interface is displayed, which verifies the correctness and reliability of the system.
DOT National Transportation Integrated Search
1998-11-01
Commercial Vehicle Operations - Roadside report discusses the findings and conclusions exclusively from Field Operational Tests (FOTs) of roadside Intelligent Transportation Systems (ITS) for Commercial Vehicle Operations (CVO). The FOTs considered i...
Description of the control system design for the SSF PMAD DC testbed
NASA Technical Reports Server (NTRS)
Baez, Anastacio N.; Kimnach, Greg L.
1991-01-01
The Power Management and Distribution (PMAD) DC Testbed Control System for Space Station Freedom was developed using a top down approach based on classical control system and conventional terrestrial power utilities design techniques. The design methodology includes the development of a testbed operating concept. This operating concept describes the operation of the testbed under all possible scenarios. A unique set of operating states was identified and a description of each state, along with state transitions, was generated. Each state is represented by a unique set of attributes and constraints, and its description reflects the degree of system security within which the power system is operating. Using the testbed operating states description, a functional design for the control system was developed. This functional design consists of a functional outline, a text description, and a logical flowchart for all the major control system functions. Described here are the control system design techniques, various control system functions, and the status of the design and implementation.
Considerations for a design and operations knowledge support system for Space Station Freedom
NASA Technical Reports Server (NTRS)
Erickson, Jon D.; Crouse, Kenneth H.; Wechsler, Donald B.; Flaherty, Douglas R.
1989-01-01
Engineering and operations of modern engineered systems depend critically upon detailed design and operations knowledge that is accurate and authoritative. A design and operations knowledge support system (DOKSS) is a modern computer-based information system providing knowledge about the creation, evolution, and growth of an engineered system. The purpose of a DOKSS is to provide convenient and effective access to this multifaceted information. The complexity of Space Station Freedom's (SSF's) systems, elements, interfaces, and organizations makes convenient access to design knowledge especially important, when compared to simpler systems. The life cycle length, being 30 or more years, adds a new dimension to space operations, maintenance, and evolution. Provided here is a review and discussion of design knowledge support systems to be delivered and operated as a critical part of the engineered system. A concept of a DOKSS for Space Station Freedom (SSF) is presented. This is followed by a detailed discussion of a DOKSS for the Lyndon B. Johnson Space Center and Work Package-2 portions of SSF.
14 CFR 23.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Fuel system hot weather operation. 23.961... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System § 23.961 Fuel system hot weather operation. Each fuel system must be free from vapor lock...
14 CFR 23.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Fuel system hot weather operation. 23.961... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System § 23.961 Fuel system hot weather operation. Each fuel system must be free from vapor lock...
14 CFR 23.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 14 Aeronautics and Space 1 2010-01-01 2010-01-01 false Fuel system hot weather operation. 23.961... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System § 23.961 Fuel system hot weather operation. Each fuel system must be free from vapor lock...
14 CFR 23.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Fuel system hot weather operation. 23.961... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System § 23.961 Fuel system hot weather operation. Each fuel system must be free from vapor lock...
14 CFR 23.961 - Fuel system hot weather operation.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Fuel system hot weather operation. 23.961... AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Powerplant Fuel System § 23.961 Fuel system hot weather operation. Each fuel system must be free from vapor lock...
NASA Technical Reports Server (NTRS)
Chung, William W.; Salvano, Dan; Rinehart, David; Young, Ray; Cheng, Victor; Lindsey, James
2012-01-01
Based on a previous Civil Tiltrotor (CTR) National Airspace System (NAS) performance analysis study, CTR operations were evaluated over selected routes and terminal airspace configurations assuming noninterference operations (NIO) and runway-independent operations (RIO). This assessment aims to further identify issues associated with these concepts of operations (ConOps), and their dependency on the airspace configuration and interaction with conventional fixed-wing traffic. Safety analysis following a traditional Safety Management System (SMS) methodology was applied to CTR-unique departure and arrival failures in the selected airspace to identify any operational and certification issues. Additional CTR operational cases were then developed to get a broader understanding of issues and gaps that will need to be addressed in future CTR operational studies. Finally, needed enhancements to National Airspace System performance analysis tools were reviewed, and recommendations were made on improvements in these tools that are likely to be required to support future progress toward CTR fleet operations in the Next Generation Air Transportation System (NextGen).
47 CFR 32.2220 - Operator systems.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 2 2014-10-01 2014-10-01 false Operator systems. 32.2220 Section 32.2220 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES UNIFORM SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2220 Operator systems...
47 CFR 32.2220 - Operator systems.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 2 2013-10-01 2013-10-01 false Operator systems. 32.2220 Section 32.2220 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES UNIFORM SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2220 Operator systems...
47 CFR 32.2220 - Operator systems.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 2 2012-10-01 2012-10-01 false Operator systems. 32.2220 Section 32.2220 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES UNIFORM SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2220 Operator systems...
47 CFR 32.2220 - Operator systems.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Operator systems. 32.2220 Section 32.2220 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES UNIFORM SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2220 Operator systems...
47 CFR 32.2220 - Operator systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Operator systems. 32.2220 Section 32.2220 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES UNIFORM SYSTEM OF ACCOUNTS FOR TELECOMMUNICATIONS COMPANIES Instructions for Balance Sheet Accounts § 32.2220 Operator systems...
Operational Plan for Underground Storage Tank 322 R2U2
DOE Office of Scientific and Technical Information (OSTI.GOV)
Griffin, D.
2017-06-07
This Operational Plan provides the operator of the tank system with guidelines relating to the safe and compliant operation and maintenance of the tank system. The tank system schematic and list of emergency contacts shall be posted near the tank so they are visible to tank personnel. This Operational Plan shall be kept on file by the Facility Supervisor. It should be understood when managing this tank system that it is used to store hazardous waste temporarily for 90 calendar days or less. The rinsewater handled in the tank system is considered hazardous and may exhibit the characteristic of toxicity.
A Reserve-based Method for Mitigating the Impact of Renewable Energy
NASA Astrophysics Data System (ADS)
Krad, Ibrahim
The fundamental operating paradigm of today's power systems is undergoing a significant shift. This is partially motivated by the increased desire for incorporating variable renewable energy resources into generation portfolios. While these generating technologies offer clean energy at zero marginal cost, i.e. no fuel costs, they also offer unique operating challenges for system operators. Perhaps the biggest operating challenge these resources introduce is accommodating their intermittent fuel source availability. For this reason, these generators increase the system-wide variability and uncertainty. As a result, system operators are revisiting traditional operating strategies to more efficiently incorporate these generation resources to maximize the benefit they provide while minimizing the challenges they introduce. One way system operators have accounted for system variability and uncertainty is through the use of operating reserves. Operating reserves can be simplified as excess capacity kept online during real time operations to help accommodate unforeseen fluctuations in demand. With new generation resources, a new class of operating reserves has emerged that is generally known as flexibility, or ramping, reserves. This new reserve class is meant to better position systems to mitigate severe ramping in the net load profile. The best way to define this new requirement is still under investigation. Typical requirement definitions focus on the additional uncertainty introduced by variable generation and there is room for improvement regarding explicit consideration for the variability they introduce. An exogenous reserve modification method is introduced in this report that can improve system reliability with minimal impacts on total system wide production costs. Another potential solution to this problem is to formulate the problem as a stochastic programming problem. The unit commitment and economic dispatch problems are typically formulated as deterministic problems due to fast solution times and the solutions being sufficient for operations. Improvements in technical computing hardware have reignited interest in stochastic modeling. The variability of wind and solar naturally lends itself to stochastic modeling. The use of explicit reserve requirements in stochastic models is an area of interest for power system researchers. This report introduces a new reserve modification implementation based on previous results to be used in a stochastic modeling framework. With technological improvements in distributed generation technologies, microgrids are currently being researched and implemented. Microgrids are small power systems that have the ability to serve their demand with their own generation resources and may have a connection to a larger power system. As battery technologies improve, they are becoming a more viable option in these distributed power systems and research is necessary to determine the most efficient way to utilize them. This report will investigate several unique operating strategies for batteries in small power systems and analyze their benefits. These new operating strategies will help reduce operating costs and improve system reliability.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hance, R.; /Fermilab
1998-08-26
This procedure is used when it is necessary to operate the solenoid energization, controls, interlocks and quench detection system. Note that a separate procedure exists for operating the solenoid 'cryogenic' systems. Only D0 Control Room Operators or the Project Electrical Engineer are qualified to execute these procedures or operate the solenoid system. This procedure assumes that the operator is familiar with using the Distributed Manufacturing Automation and Control Software (DMACS).
Advanced Ground Systems Maintenance Physics Models for Diagnostics Project
NASA Technical Reports Server (NTRS)
Harp, Janicce Leshay
2014-01-01
The project will use high-fidelity physics models and simulations to simulate real-time operations of cryogenic and systems and calculate the status/health of the systems. The project enables the delivery of system health advisories to ground system operators. The capability will also be used to conduct planning and analysis of cryogenic system operations.
Code of Federal Regulations, 2010 CFR
2010-07-01
... inflatable lifesaving appliances and marine evacuation systems? 150.506 Section 150.506 Navigation and...: OPERATIONS Emergency and Specialty Equipment Inflatable Lifesaving Appliances § 150.506 When must the operator service inflatable lifesaving appliances and marine evacuation systems? (a) The operator must...
NASA Technical Reports Server (NTRS)
Kopardekar, Parimal Hemchandra
2015-01-01
Many UAS will operate at lower altitude (Class G, below 2000 feet). There is an urgent need for a system for civilian low-altitude airspace and UAS operations. Stakeholders want to work with NASA to enable safe operations.
NASA Technical Reports Server (NTRS)
Kopardekar, Parimal H.
2015-01-01
Many UAS will operate at lower altitude (Class G, below 2000 feet)There is urgent need for a system for civilian low-altitude airspace and UAS operations. Stakeholders want to work with NASA to enable safe operations.
40 CFR 63.11583 - What are my monitoring requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... preparation operation are in target HAP service: (a) Operate a bag leak detection system with alarm that will alert operators of a leak in the control device filter material. If a bag leak detection system with... install, calibrate, operate, and maintain each bag leak detection system and alarm according to...
46 CFR 113.35-13 - Mechanical engine order telegraph systems; operation.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 46 Shipping 4 2010-10-01 2010-10-01 false Mechanical engine order telegraph systems; operation. 113.35-13 Section 113.35-13 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED...-13 Mechanical engine order telegraph systems; operation. If more than one transmitter operates a...
14 CFR 25.21 - Proof of compliance.
Code of Federal Regulations, 2013 CFR
2013-01-01
... augmentation system or upon any other automatic or power-operated system, compliance must be shown with §§ 25... appendix C, assuming normal operation of the airplane and its ice protection system in accordance with the operating limitations and operating procedures established by the applicant and provided in the Airplane...
23 CFR 752.8 - Privately operated information centers and systems.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 23 Highways 1 2010-04-01 2010-04-01 false Privately operated information centers and systems. 752... may permit privately operated information centers and systems which conform with the standards of this... AND ENVIRONMENT LANDSCAPE AND ROADSIDE DEVELOPMENT § 752.8 Privately operated information centers and...
14 CFR 25.21 - Proof of compliance.
Code of Federal Regulations, 2014 CFR
2014-01-01
... augmentation system or upon any other automatic or power-operated system, compliance must be shown with §§ 25... appendix C, assuming normal operation of the airplane and its ice protection system in accordance with the operating limitations and operating procedures established by the applicant and provided in the Airplane...
14 CFR 25.21 - Proof of compliance.
Code of Federal Regulations, 2010 CFR
2010-01-01
... augmentation system or upon any other automatic or power-operated system, compliance must be shown with §§ 25..., assuming normal operation of the airplane and its ice protection system in accordance with the operating limitations and operating procedures established by the applicant and provided in the Airplane Flight Manual...
14 CFR 25.21 - Proof of compliance.
Code of Federal Regulations, 2011 CFR
2011-01-01
... augmentation system or upon any other automatic or power-operated system, compliance must be shown with §§ 25..., assuming normal operation of the airplane and its ice protection system in accordance with the operating limitations and operating procedures established by the applicant and provided in the Airplane Flight Manual...
23 CFR 752.8 - Privately operated information centers and systems.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 23 Highways 1 2011-04-01 2011-04-01 false Privately operated information centers and systems. 752... may permit privately operated information centers and systems which conform with the standards of this... AND ENVIRONMENT LANDSCAPE AND ROADSIDE DEVELOPMENT § 752.8 Privately operated information centers and...
23 CFR 752.8 - Privately operated information centers and systems.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 23 Highways 1 2013-04-01 2013-04-01 false Privately operated information centers and systems. 752... may permit privately operated information centers and systems which conform with the standards of this... AND ENVIRONMENT LANDSCAPE AND ROADSIDE DEVELOPMENT § 752.8 Privately operated information centers and...
23 CFR 752.8 - Privately operated information centers and systems.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 23 Highways 1 2012-04-01 2012-04-01 false Privately operated information centers and systems. 752... may permit privately operated information centers and systems which conform with the standards of this... AND ENVIRONMENT LANDSCAPE AND ROADSIDE DEVELOPMENT § 752.8 Privately operated information centers and...
23 CFR 752.8 - Privately operated information centers and systems.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 23 Highways 1 2014-04-01 2014-04-01 false Privately operated information centers and systems. 752... may permit privately operated information centers and systems which conform with the standards of this... AND ENVIRONMENT LANDSCAPE AND ROADSIDE DEVELOPMENT § 752.8 Privately operated information centers and...
14 CFR 27.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2013 CFR
2013-01-01
... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: NORMAL CATEGORY ROTORCRAFT Design and Construction Control Systems § 27.695 Power boost and power-operated control system. (a) If a power boost or power-operated... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Power boost and power-operated control...
14 CFR 29.695 - Power boost and power-operated control system.
Code of Federal Regulations, 2013 CFR
2013-01-01
... TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Design and Construction Control Systems § 29.695 Power boost and power-operated control system. (a) If a power boost or power-operated... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Power boost and power-operated control...
Advanced Ground Systems Maintenance Prognostics Project
NASA Technical Reports Server (NTRS)
Perotti, Jose M.
2015-01-01
The project implements prognostics capabilities to predict when a component system or subsystem will no longer meet desired functional or performance criteria, called the end of life. The capability also provides an assessment of the remaining useful life of a hardware component. The project enables the delivery of system health advisories to ground system operators. This project will use modeling techniques and algorithms to assess components' health andpredict remaining life for such components. The prognostics capability being developed will beused:during the design phase and during pre/post operations to conduct planning and analysis ofsystem design, maintenance & logistics plans, and system/mission operations plansduring real-time operations to monitor changes to components' health and assess their impacton operations.This capability will be interfaced to Ground Operations' command and control system as a part ofthe AGSM project to help assure system availability and mission success. The initial modelingeffort for this capability will be developed for Liquid Oxygen ground loading applications.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Henline, P.A.
1995-12-31
The increased use of UNIX based computer systems for machine control, data handling and analysis has greatly enhanced the operating scenarios and operating efficiency of the DIII-D tokamak. This paper will describe some of these UNIX systems and their specific uses. These include the plasma control system, the electron cyclotron heating control system, the analysis of electron temperature and density measurements and the general data acquisition system (which is collecting over 130 Mbytes of data). The speed and total capability of these systems has dramatically affected the ability to operate DIII-D. The improved operating scenarios include better plasma shape controlmore » due to the more thorough MHD calculations done between shots and the new ability to see the time dependence of profile data as it relates across different spatial locations in the tokamak. Other analysis which engenders improved operating abilities will be described.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Henline, P.A.
1995-10-01
The increased use of UNIX based computer systems for machine control, data handling and analysis has greatly enhanced the operating scenarios and operating efficiency of the DRI-D tokamak. This paper will describe some of these UNIX systems and their specific uses. These include the plasma control system, the electron cyclotron heating control system, the analysis of electron temperature and density measurements and the general data acquisition system (which is collecting over 130 Mbytes of data). The speed and total capability of these systems has dramatically affected the ability to operate DIII-D. The improved operating scenarios include better plasma shape controlmore » due to the more thorough MHD calculations done between shots and the new ability to see the time dependence of profile data as it relates across different spatial locations in the tokamak. Other analysis which engenders improved operating abilities will be described.« less
NASDA's Advanced On-Line System (ADOLIS)
NASA Technical Reports Server (NTRS)
Yamamoto, Yoshikatsu; Hara, Hideo; Yamada, Shigeo; Hirata, Nobuyuki; Komatsu, Shigenori; Nishihata, Seiji; Oniyama, Akio
1993-01-01
Spacecraft operations including ground system operations are generally realized by various large or small scale group work which is done by operators, engineers, managers, users and so on, and their positions are geographically distributed in many cases. In face-to-face work environments, it is easy for them to understand each other. However, in distributed work environments which need communication media, if only using audio, they become estranged from each other and lose interest in and continuity of work. It is an obstacle to smooth operation of spacecraft. NASDA has developed an experimental model of a new real-time operation control system called 'ADOLIS' (ADvanced On-Line System) adopted to such a distributed environment using a multi-media system dealing with character, figure, image, handwriting, video and audio information which is accommodated to operation systems of a wide range including spacecraft and ground systems. This paper describes the results of the development of the experimental model.
Lemmetty, Kaisa; Häyrinen, Eija
2005-01-01
In this paper we evaluate the implementation of the operation management system in the Central Finland Health Care District. The implementation of the operation management system changed the practice of operation management for the surgical clinic and concerned 500 personnel in total. A survey was carried out to investigate the end users' views on the system's usefulness, usability and the training and user support provided. The users' possibilities to accomplish their tasks and the kind of obstacles they face in operation management were explored. The assessment revealed that more end support is needed after the system implementation, even though a generally positive attitude towards the system was manifested among the staff.
InkTag: Secure Applications on an Untrusted Operating System
Hofmann, Owen S.; Kim, Sangman; Dunn, Alan M.; Lee, Michael Z.; Witchel, Emmett
2014-01-01
InkTag is a virtualization-based architecture that gives strong safety guarantees to high-assurance processes even in the presence of a malicious operating system. InkTag advances the state of the art in untrusted operating systems in both the design of its hypervisor and in the ability to run useful applications without trusting the operating system. We introduce paraverification, a technique that simplifies the InkTag hypervisor by forcing the untrusted operating system to participate in its own verification. Attribute-based access control allows trusted applications to create decentralized access control policies. InkTag is also the first system of its kind to ensure consistency between secure data and metadata, ensuring recoverability in the face of system crashes. PMID:24429939
InkTag: Secure Applications on an Untrusted Operating System.
Hofmann, Owen S; Kim, Sangman; Dunn, Alan M; Lee, Michael Z; Witchel, Emmett
2013-01-01
InkTag is a virtualization-based architecture that gives strong safety guarantees to high-assurance processes even in the presence of a malicious operating system. InkTag advances the state of the art in untrusted operating systems in both the design of its hypervisor and in the ability to run useful applications without trusting the operating system. We introduce paraverification , a technique that simplifies the InkTag hypervisor by forcing the untrusted operating system to participate in its own verification. Attribute-based access control allows trusted applications to create decentralized access control policies. InkTag is also the first system of its kind to ensure consistency between secure data and metadata, ensuring recoverability in the face of system crashes.
Solar thermochemical processing system and method
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wegeng, Robert S.; Humble, Paul H.; Krishnan, Shankar
A solar thermochemical processing system is disclosed. The system includes a first unit operation for receiving concentrated solar energy. Heat from the solar energy is used to drive the first unit operation. The first unit operation also receives a first set of reactants and produces a first set of products. A second unit operation receives the first set of products from the first unit operation and produces a second set of products. A third unit operation receives heat from the second unit operation to produce a portion of the first set of reactants.
2015-05-01
Director, Operational Test and Evaluation Department of Defense (DOD) Automated Biometric Identification System (ABIS) Version 1.2 Initial...Operational Test and Evaluation Report May 2015 This report on the Department of Defense (DOD) Automated Biometric Identification System...COVERED - 4. TITLE AND SUBTITLE Department of Defense (DOD) Automated Biometric Identification System (ABIS) Version 1.2 Initial Operational Test
Code of Federal Regulations, 2010 CFR
2010-10-01
... entities operating rapid or light rail systems. 37.81 Section 37.81 Transportation Office of the Secretary... operating rapid or light rail systems. (a) Except as provided elsewhere in this section, each public entity operating a rapid or light rail system which, after August 25, 1990, purchases or leases a used rapid or...
Code of Federal Regulations, 2012 CFR
2012-10-01
... entities operating rapid or light rail systems. 37.81 Section 37.81 Transportation Office of the Secretary... operating rapid or light rail systems. (a) Except as provided elsewhere in this section, each public entity operating a rapid or light rail system which, after August 25, 1990, purchases or leases a used rapid or...
Code of Federal Regulations, 2011 CFR
2011-10-01
... entities operating rapid or light rail systems. 37.81 Section 37.81 Transportation Office of the Secretary... operating rapid or light rail systems. (a) Except as provided elsewhere in this section, each public entity operating a rapid or light rail system which, after August 25, 1990, purchases or leases a used rapid or...
Code of Federal Regulations, 2013 CFR
2013-10-01
... entities operating rapid or light rail systems. 37.81 Section 37.81 Transportation Office of the Secretary... operating rapid or light rail systems. (a) Except as provided elsewhere in this section, each public entity operating a rapid or light rail system which, after August 25, 1990, purchases or leases a used rapid or...
Code of Federal Regulations, 2014 CFR
2014-10-01
... entities operating rapid or light rail systems. 37.81 Section 37.81 Transportation Office of the Secretary... operating rapid or light rail systems. (a) Except as provided elsewhere in this section, each public entity operating a rapid or light rail system which, after August 25, 1990, purchases or leases a used rapid or...
NASA Technical Reports Server (NTRS)
1985-01-01
Long-term and short-term objectives for the development of a network operating system for the Space Station are stated. The short-term objective is to develop a prototype network operating system for a 100 megabit/second fiber optic data bus. The long-term objective is to establish guidelines for writing a detailed specification for a Space Station network operating system. Major milestones are noted. Information is given in outline form.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Operating Limits for Capture Systems... 63—Operating Limits for Capture Systems and Add-On Control Devices If you are required to comply with operating limits by § 63.3093, you must comply with the applicable operating limits in the following table...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Operating Limits for Capture Systems... 63—Operating Limits for Capture Systems and Add-On Control Devices If you are required to comply with operating limits by § 63.3093, you must comply with the applicable operating limits in the following table...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Operating Limits for Capture Systems... Subpart IIII of Part 63—Operating Limits for Capture Systems and Add-On Control Devices If you are required to comply with operating limits by § 63.3093, you must comply with the applicable operating limits...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Operating Limits for Capture Systems... Subpart IIII of Part 63—Operating Limits for Capture Systems and Add-On Control Devices If you are required to comply with operating limits by § 63.3093, you must comply with the applicable operating limits...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Operating Limits for Capture Systems... Subpart IIII of Part 63—Operating Limits for Capture Systems and Add-On Control Devices If you are required to comply with operating limits by § 63.3093, you must comply with the applicable operating limits...
NASA Astrophysics Data System (ADS)
Cheng, Jilin; Zhang, Lihua; Zhang, Rentian; Gong, Yi; Zhu, Honggeng; Deng, Dongsheng; Feng, Xuesong; Qiu, Jinxian
2010-06-01
A dynamic planning model for optimizing operation of variable speed pumping system, aiming at minimum power consumption, was proposed to achieve economic operation. The No. 4 Jiangdu Pumping Station, a source pumping station in China's Eastern Route of South-to-North Water Diversion Project, is taken as a study case. Since the sump water level of Jiangdu Pumping Station is affected by the tide of Yangtze River, the daily-average heads of the pumping system varies yearly from 3.8m to 7.8m and the tide level difference in one day up to 1.2m. Comparisons of operation electricity cost between optimized variable speed and fixed speed operations of pumping system were made. When the full load operation mode is adopted, whether or not electricity prices in peak-valley periods are considered, the benefits of variable speed operation cannot compensate the energy consumption of the VFD. And when the pumping system operates in part load and the peak-valley electricity prices are considered, the pumping system should cease operation or lower its rotational speed in peak load hours since the electricity price are much higher, and to the contrary the pumping system should raise its rotational speed in valley load hours to pump more water. The computed results show that if the pumping system operates in 80% or 60% loads, the energy consumption cost of specified volume of water will save 14.01% and 26.69% averagely by means of optimal variable speed operation, and the investment on VFD will be paid back in 2 or 3 years. However, if the pumping system operates in 80% or 60% loads and the energy cost is calculated in non peak-valley electricity price, the repayment will be lengthened up to 18 years. In China's S-to-N Water Diversion Project, when the market operation and peak-valley electricity prices are taken into effect to supply water and regulate water levels in regulation reservoirs as Hongzehu Lake, Luomahu Lake, etc. the economic operation of water-diversion pumping stations will be vital, and the adoption of VFDs to achieve optimal operation may be a good choice.
Flexible and adaptive water systems operations through more informed and dynamic decisions
NASA Astrophysics Data System (ADS)
Castelletti, A.; Giuliani, M.
2016-12-01
Timely adapting the operations of water systems to be resilient against rapid changes in both hydroclimatic and socioeconomic forcing is generally recommended as a part of planning and managing water resources under uncertain futures. A great opportunity to make the operations more flexible and adaptive is offered by the unprecedented amount of information that is becoming available to water system operators, providing a wide range of data at increasingly higher temporal and spatial resolution. Yet, many water systems are still operated using very simple information systems, typically based on basic statistical analysis and the operator's experience. In this work, we discuss the potential offered by incorporating improved information to enhance water systems operation and increase their ability of adapting to different external conditions and resolving potential conflicts across sectors. In particular, we focus on the use of different variables associated to different dynamics of the system (slow and fast) diversely impacting the operating objectives on the short-, medium- and long-term. The multi-purpose operations of the Hoa Binh reservoir in the Red River Basin (Vietnam) is used to demonstrate our approach. Numerical results show that our procedure is able to automatically select the most valuable information for improving the Hoa Binh operations and mitigating the conflict between short-term objectives, i.e. hydropower production and flood control. Moreover, we also successfully identify low-frequency climate information associated to El-Nino Southern Oscillation for improving the performance in terms of long-term objectives, i.e. water supply. Finally, we assess the value of better informing operational decisions for adapting the system operations to changing conditions by considering different climate change projections.
Code of Federal Regulations, 2013 CFR
2013-10-01
... control means a function of an automatic control system to restrict operation to a specified operating... automatic or manual control. Safety trip control system means a manually or automatically operated system... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Terms Used...
Code of Federal Regulations, 2010 CFR
2010-10-01
... control means a function of an automatic control system to restrict operation to a specified operating... automatic or manual control. Safety trip control system means a manually or automatically operated system... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Terms Used...
Code of Federal Regulations, 2012 CFR
2012-10-01
... control means a function of an automatic control system to restrict operation to a specified operating... automatic or manual control. Safety trip control system means a manually or automatically operated system... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Terms Used...
Code of Federal Regulations, 2014 CFR
2014-10-01
... control means a function of an automatic control system to restrict operation to a specified operating... automatic or manual control. Safety trip control system means a manually or automatically operated system... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Terms Used...
Code of Federal Regulations, 2011 CFR
2011-10-01
... control means a function of an automatic control system to restrict operation to a specified operating... automatic or manual control. Safety trip control system means a manually or automatically operated system... GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) MARINE ENGINEERING VITAL SYSTEM AUTOMATION Terms Used...
75 FR 16676 - Airworthiness Standards; Electrical and Electronic System Lightning Protection
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-02
... systems that allow them to operate into instrument meteorological conditions (IMC), where lightning... 27 standards that operate in VFR-only operations with electrical or electronic systems installed for... Airworthiness Standards; Electrical and Electronic System Lightning Protection AGENCY: Federal Aviation...
Automatic Learning of Fine Operating Rules for Online Power System Security Control.
Sun, Hongbin; Zhao, Feng; Wang, Hao; Wang, Kang; Jiang, Weiyong; Guo, Qinglai; Zhang, Boming; Wehenkel, Louis
2016-08-01
Fine operating rules for security control and an automatic system for their online discovery were developed to adapt to the development of smart grids. The automatic system uses the real-time system state to determine critical flowgates, and then a continuation power flow-based security analysis is used to compute the initial transfer capability of critical flowgates. Next, the system applies the Monte Carlo simulations to expected short-term operating condition changes, feature selection, and a linear least squares fitting of the fine operating rules. The proposed system was validated both on an academic test system and on a provincial power system in China. The results indicated that the derived rules provide accuracy and good interpretability and are suitable for real-time power system security control. The use of high-performance computing systems enables these fine operating rules to be refreshed online every 15 min.
Development of lung cancer CT screening operating support system
NASA Astrophysics Data System (ADS)
Ishigaki, Rikuta; Hanai, Kozou; Suzuki, Masahiro; Kawata, Yoshiki; Niki, Noboru; Eguchi, Kenji; Kakinuma, Ryutaro; Moriyama, Noriyuki
2009-02-01
In Japan, lung cancer death ranks first among men and third among women. Lung cancer death is increasing yearly, thus early detection and treatment are needed. For this reason, CT screening for lung cancer has been introduced. The CT screening services are roughly divided into three sections: office, radiology and diagnosis sections. These operations have been performed through paper-based or a combination of paper-based and an existing electronic health recording system. This paper describes an operating support system for lung cancer CT screening in order to make the screening services efficient. This operating support system is developed on the basis of 1) analysis of operating processes, 2) digitalization of operating information, and 3) visualization of operating information. The utilization of the system is evaluated through an actual application and users' survey questionnaire obtained from CT screening centers.
32 CFR Appendix B to Part 323 - Criteria for New and Altered Record Systems
Code of Federal Regulations, 2010 CFR
2010-07-01
... as operating systems and system utilities that provide for easier access are considered alterations... terminals does not extend the capacity of the current operating system and existing security is preserved. f... not operate a system of records until the waiting periods have expired. E. Outside review of new and...
32 CFR Appendix B to Part 323 - Criteria for New and Altered Record Systems
Code of Federal Regulations, 2012 CFR
2012-07-01
... as operating systems and system utilities that provide for easier access are considered alterations... terminals does not extend the capacity of the current operating system and existing security is preserved. f... not operate a system of records until the waiting periods have expired. E. Outside review of new and...
32 CFR Appendix B to Part 323 - Criteria for New and Altered Record Systems
Code of Federal Regulations, 2011 CFR
2011-07-01
... as operating systems and system utilities that provide for easier access are considered alterations... terminals does not extend the capacity of the current operating system and existing security is preserved. f... not operate a system of records until the waiting periods have expired. E. Outside review of new and...
Rogers, David A; Lingard, Lorelei; Boehler, Margaret L; Espin, Sherry; Schindler, Nancy; Klingensmith, Mary; Mellinger, John D
2013-09-01
Prior research has shown that surgeons who effectively manage operating room conflict engage in a problem-solving stage devoted to modifying systems that contribute to team conflict. The purpose of this study was to clarify how systems contributed to operating room team conflict and clarify what surgeons do to modify them. Focus groups of circulating nurses and surgeons were conducted at 5 academic medical centers. Narratives describing the contributions of systems to operating room conflict and behaviors used by surgeons to address those systems were analyzed using the constant comparative approach associated with a constructivist grounded theory approach. Operating room team conflict was affected by 4 systems-related factors: team features, procedural-specific staff training, equipment management systems, and the administrative leadership itself. Effective systems problem solving included advocating for change based on patient safety concerns. The results of this study provide clarity about how systems contribute to operating room conflict and what surgeons can do to effectively modify these systems. This information is foundational material for a conflict management educational program for surgeons. Copyright © 2013 Elsevier Inc. All rights reserved.
Advanced parking information system evaluation report
DOT National Transportation Integrated Search
1997-01-01
This report documents the evaluation analysis and results of the operational test. The evaluation assesses the impact/effect of the advance parking information system on the motoring public, parking facility operators, roadway system operations, and ...
ORATOS: ESA's future flight dynamics operations system
NASA Astrophysics Data System (ADS)
Dreger, Frank; Fertig, Juergen; Muench, Rolf
The Orbit and Attitude Operations System (ORATOS -- the European Space Agency's future orbit and attitude operations system -- will be in use from the mid-nineties until well beyond the year 2000. The ORATOS design is based on the experience from flight dynamics support to all past ESA missions. The ORATOS computer hardware consists of a network of powerful UNIX workstations. ORATOS resides on several hardware platforms, each comprising one or more fileservers, several client workstations and the associated communications interface hardware. The ORATOS software is structured into three layers. The flight dynamics applications layer, the support layer and the operating system layer. This architectural design separates the flight dynamics application software from the support tools and operating system facilities. It allows upgrading and replacement of operating system facilities with a minimum (or no) effect on the application layer.
Potential Operating Orbits for Fission Electric Propulsion Systems Driven by the SAFE-400
NASA Technical Reports Server (NTRS)
Houts, Mike; Kos, Larry; Poston, David; Rodgers, Stephen L. (Technical Monitor)
2002-01-01
Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp greater than 3000s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially nonradioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into non-radioactive isotopes. Operational constraints required to ensure safety can thus be quantified.
Potential operating orbits for fission electric propulsion systems driven by the SAFE-400
NASA Astrophysics Data System (ADS)
Houts, Mike; Kos, Larry; Poston, David
2002-01-01
Safety must be ensured during all phases of space fission system design, development, fabrication, launch, operation, and shutdown. One potential space fission system application is fission electric propulsion (FEP), in which fission energy is converted into electricity and used to power high efficiency (Isp>3000s) electric thrusters. For these types of systems it is important to determine which operational scenarios ensure safety while allowing maximum mission performance and flexibility. Space fission systems are essentially non-radioactive at launch, prior to extended operation at high power. Once high power operation begins, system radiological inventory steadily increases as fission products build up. For a given fission product isotope, the maximum radiological inventory is typically achieved once the system has operated for a length of time equivalent to several half-lives. After that time, the isotope decays at the same rate it is produced, and no further inventory builds in. For an FEP mission beginning in Earth orbit, altitude and orbital lifetime increase as the propulsion system operates. Two simultaneous effects of fission propulsion system operation are thus (1) increasing fission product inventory and (2) increasing orbital lifetime. Phrased differently, as fission products build up, more time is required for the fission products to naturally convert back into non-radioactive isotopes. Simultaneously, as fission products build up, orbital lifetime increases, providing more time for the fission products to naturally convert back into non-radioactive isotopes. Operational constraints required to ensure safety can thus be quantified. .
Implementation of an Intelligent Control System
1992-05-01
there- fore implemented in a portable equipment rack. The controls computer consists of a microcomputer running a real time operating system , interface...circuit boards are mounted in an industry standard Multibus I chassis. The microcomputer runs the iRMX real time operating system . This operating system
A Proposed Operational Concept for the Defense Communications Operations Support System.
1986-01-01
Artificial Intelligence AMA Automatic Message Accounting AMIE AUTODIN Management Index System AMPE Automated Message Processing Exchange ANCS AUTOVON Network...Support IMPRESS Inpact/Restoral System INFORM Information Retrieval System 1OC Initial Operational Capability IRU Intellegent Remote Unit I-S/A AMPE
Commanding and Controlling Satellite Clusters (IEEE Intelligent Systems, November/December 2000)
2000-01-01
real - time operating system , a message-passing OS well suited for distributed...ground Flight processors ObjectAgent RTOS SCL RTOS RDMS Space command language Real - time operating system Rational database management system TS-21 RDMS...engineer with Princeton Satellite Systems. She is working with others to develop ObjectAgent software to run on the OSE Real Time Operating System .
Systemic Operational Design: Improving Operational Planning for the Netherlands Armed Forces
2006-05-25
This methodology is called Soft Systems Methodology . His methodology is a structured way of thinking in which not only a perceived problematic...Many similarities exist between Systemic Operational Design and Soft Systems Methodology , their epistemology is related. Furthermore, they both have...Systems Thinking: Managing Chaos and Complexity. Boston: Butterworth Heinemann, 1999. Checkland, Peter, and Jim Scholes. Soft Systems Methodology in
Spatial operator algebra framework for multibody system dynamics
NASA Technical Reports Server (NTRS)
Rodriguez, G.; Jain, Abhinandan; Kreutz, K.
1989-01-01
The Spatial Operator Algebra framework for the dynamics of general multibody systems is described. The use of a spatial operator-based methodology permits the formulation of the dynamical equations of motion of multibody systems in a concise and systematic way. The dynamical equations of progressively more complex grid multibody systems are developed in an evolutionary manner beginning with a serial chain system, followed by a tree topology system and finally, systems with arbitrary closed loops. Operator factorizations and identities are used to develop novel recursive algorithms for the forward dynamics of systems with closed loops. Extensions required to deal with flexible elements are also discussed.
Spatial Operator Algebra for multibody system dynamics
NASA Technical Reports Server (NTRS)
Rodriguez, G.; Jain, A.; Kreutz-Delgado, K.
1992-01-01
The Spatial Operator Algebra framework for the dynamics of general multibody systems is described. The use of a spatial operator-based methodology permits the formulation of the dynamical equations of motion of multibody systems in a concise and systematic way. The dynamical equations of progressively more complex grid multibody systems are developed in an evolutionary manner beginning with a serial chain system, followed by a tree topology system and finally, systems with arbitrary closed loops. Operator factorizations and identities are used to develop novel recursive algorithms for the forward dynamics of systems with closed loops. Extensions required to deal with flexible elements are also discussed.
NASA Astrophysics Data System (ADS)
Ibrahim, Wael Refaat Anis
The present research involves the development of several fuzzy expert systems for power quality analysis and diagnosis. Intelligent systems for the prediction of abnormal system operation were also developed. The performance of all intelligent modules developed was either enhanced or completely produced through adaptive fuzzy learning techniques. Neuro-fuzzy learning is the main adaptive technique utilized. The work presents a novel approach to the interpretation of power quality from the perspective of the continuous operation of a single system. The research includes an extensive literature review pertaining to the applications of intelligent systems to power quality analysis. Basic definitions and signature events related to power quality are introduced. In addition, detailed discussions of various artificial intelligence paradigms as well as wavelet theory are included. A fuzzy-based intelligent system capable of identifying normal from abnormal operation for a given system was developed. Adaptive neuro-fuzzy learning was applied to enhance its performance. A group of fuzzy expert systems that could perform full operational diagnosis were also developed successfully. The developed systems were applied to the operational diagnosis of 3-phase induction motors and rectifier bridges. A novel approach for learning power quality waveforms and trends was developed. The technique, which is adaptive neuro fuzzy-based, learned, compressed, and stored the waveform data. The new technique was successfully tested using a wide variety of power quality signature waveforms, and using real site data. The trend-learning technique was incorporated into a fuzzy expert system that was designed to predict abnormal operation of a monitored system. The intelligent system learns and stores, in compressed format, trends leading to abnormal operation. The system then compares incoming data to the retained trends continuously. If the incoming data matches any of the learned trends, an alarm is instigated predicting the advent of system abnormal operation. The incoming data could be compared to previous trends as well as matched to trends developed through computer simulations and stored using fuzzy learning.
Identifying Potential Weapon Systems That Can Be Divested
2016-04-08
List of Figures Figure 1.1 – TACOM LCMC Sustainment Systems Technical Support (SSTS) Operation Maintenance Army (OMA)……………………………………………………………………….6...LCMC Sustainment Systems Technical Support (SSTS) Operation Maintenance Army (OMA) Requirements Tracking System (TORTS) process used to develop...Force operational concepts (Peltz, 2003). The Army’s ability to keep systems operational from a maintenance standpoint is driven by two factors
Engineering Safety- and Security-Related Requirements for Software-Intensive Systems
2010-04-27
Requirements Negative (shall not) Requirements Hardware Requirements equ remen s System / Documentation Requirements eve oper Requirements Operational ...Validation Actual / Proposed Defensibility C li Operational Vulnerability Analysis VulnerabilityVulnerability Safety Vulnerability performs System ...including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson
40 CFR 267.198 - What are the general operating requirements for my tank systems?
Code of Federal Regulations, 2012 CFR
2012-07-01
... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 28 2012-07-01 2012-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...
14 CFR 25.809 - Emergency exit arrangement.
Code of Federal Regulations, 2013 CFR
2013-01-01
...-boost or single power-operated system is the primary system for operating more than one exit in an... effort; and must be arranged and marked so that it can be readily located and operated, even in darkness... event of failure of the primary system. Manual operation of the exit (after failure of the primary...
40 CFR 267.198 - What are the general operating requirements for my tank systems?
Code of Federal Regulations, 2011 CFR
2011-07-01
... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 27 2011-07-01 2011-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...
14 CFR 25.809 - Emergency exit arrangement.
Code of Federal Regulations, 2012 CFR
2012-01-01
...-boost or single power-operated system is the primary system for operating more than one exit in an... effort; and must be arranged and marked so that it can be readily located and operated, even in darkness... event of failure of the primary system. Manual operation of the exit (after failure of the primary...
40 CFR 267.198 - What are the general operating requirements for my tank systems?
Code of Federal Regulations, 2014 CFR
2014-07-01
... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 27 2014-07-01 2014-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...
14 CFR 25.809 - Emergency exit arrangement.
Code of Federal Regulations, 2010 CFR
2010-01-01
...-boost or single power-operated system is the primary system for operating more than one exit in an... effort; and must be arranged and marked so that it can be readily located and operated, even in darkness... event of failure of the primary system. Manual operation of the exit (after failure of the primary...
40 CFR 267.198 - What are the general operating requirements for my tank systems?
Code of Federal Regulations, 2013 CFR
2013-07-01
... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 28 2013-07-01 2013-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...
40 CFR 267.198 - What are the general operating requirements for my tank systems?
Code of Federal Regulations, 2010 CFR
2010-07-01
... FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Tank Systems § 267.198 What are the general operating... 40 Protection of Environment 26 2010-07-01 2010-07-01 false What are the general operating requirements for my tank systems? 267.198 Section 267.198 Protection of Environment ENVIRONMENTAL PROTECTION...
14 CFR 25.809 - Emergency exit arrangement.
Code of Federal Regulations, 2014 CFR
2014-01-01
...-boost or single power-operated system is the primary system for operating more than one exit in an... effort; and must be arranged and marked so that it can be readily located and operated, even in darkness... event of failure of the primary system. Manual operation of the exit (after failure of the primary...
Anomalous event diagnosis for environmental satellite systems
NASA Technical Reports Server (NTRS)
Ramsay, Bruce H.
1993-01-01
The National Oceanic and Atmospheric Administration's (NOAA) National Environmental Satellite, Data, and Information Service (NESDIS) is responsible for the operation of the NOAA geostationary and polar orbiting satellites. NESDIS provides a wide array of operational meteorological and oceanographic products and services and operates various computer and communication systems on a 24-hour, seven days per week schedule. The Anomaly Reporting System contains a database of anomalous events regarding the operations of the Geostationary Operational Environmental Satellite (GOES), communication, or computer systems that have degraded or caused the loss of GOES imagery. Data is currently entered manually via an automated query user interface. There are 21 possible symptoms (e.g., No Data), and 73 possible causes (e.g., Sectorizer - World Weather Building) of an anomalous event. The determination of an event's cause(s) is made by the on-duty computer operator, who enters the event in a paper based daily log, and by the analyst entering the data into the reporting system. The determination of the event's cause(s) impacts both the operational status of these systems, and the performance evaluation of the on-site computer and communication operations contractor.
Hu, Peter F; Xiao, Yan; Ho, Danny; Mackenzie, Colin F; Hu, Hao; Voigt, Roger; Martz, Douglas
2006-06-01
One of the major challenges for day-of-surgery operating room coordination is accurate and timely situation awareness. Distributed and secure real-time status information is key to addressing these challenges. This article reports on the design and implementation of a passive status monitoring system in a 19-room surgical suite of a major academic medical center. Key design requirements considered included integrated real-time operating room status display, access control, security, and network impact. The system used live operating room video images and patient vital signs obtained through monitors to automatically update events and operating room status. Images were presented on a "need-to-know" basis, and access was controlled by identification badge authorization. The system delivered reliable real-time operating room images and status with acceptable network impact. Operating room status was visualized at 4 separate locations and was used continuously by clinicians and operating room service providers to coordinate operating room activities.
Research and application of embedded real-time operating system
NASA Astrophysics Data System (ADS)
Zhang, Bo
2013-03-01
In this paper, based on the analysis of existing embedded real-time operating system, the architecture of an operating system is designed and implemented. The experimental results show that the design fully complies with the requirements of embedded real-time operating system, can achieve the purposes of reducing the complexity of embedded software design and improving the maintainability, reliability, flexibility. Therefore, this design program has high practical value.
1982-07-01
blocks. DISCUS has no form of hardware synchronisation between the processors. The only synchronisation is at an operating system level. ;ach processor is... operations in global store so that semaphoring on global objects can be done correctly. Write Protect is used by the operating system for read-only...the appropriate operating system program. String Handling primitives . The Z8000 has a rich set of string primitives . However as we saw before if a
Portable System for Field-feeding Greywater Remediation and Recycling
2007-03-01
for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302. Respondents should be aware that...system to remediate and recycle dirty sink water from its field feeding and sanitation operations . A greywater recycling system is expected to reduce...two weeks and each of the three systems was operated out-of doors treating water created during actual field feeding operations . Water samples were
Demonstration of Four Operating Capabilities to Enable a Small Aircraft Transportation System
NASA Technical Reports Server (NTRS)
Viken, Sally A.; Brooks, Frederick M.
2005-01-01
The Small Aircraft Transportation System (SATS) project has been a five-year effort fostering research and development that could lead to the transformation of our country s air transportation system. It has become evident that our commercial air transportation system is reaching its peak in terms of capacity, with numerous delays in the system and the demand keeps steadily increasing. The SATS vision is to increase mobility in our nation s transportation system by expanding access to more than 3400 small community airports that are currently under-utilized. The SATS project has focused its efforts on four key operating capabilities that have addressed new emerging technologies and procedures to pave the way for a new way of air travel. The four key operating capabilities are: Higher Volume Operations at Non-Towered/Non-Radar Airports, En Route Procedures and Systems for Integrated Fleet Operations, Lower Landing Minimums at Minimally Equipped Landing Facilities, and Increased Single Pilot Performance. These four capabilities are key to enabling low-cost, on-demand, point-to-point transportation of goods and passengers utilizing small aircraft operating from small airports. The focus of this paper is to discuss the technical and operational feasibility of the four operating capabilities and demonstrate how they can enable a small aircraft transportation system.
NASA Astrophysics Data System (ADS)
Nanaeda, Kimihiro; Mueller, Fabian; Brouwer, Jacob; Samuelsen, Scott
Operating strategies of solid oxide fuel cell (SOFC) combined heat and power (CHP) systems are developed and evaluated from a utility, and end-user perspective using a fully integrated SOFC-CHP system dynamic model that resolves the physical states, thermal integration and overall efficiency of the system. The model can be modified for any SOFC-CHP system, but the present analysis is applied to a hotel in southern California based on measured electric and heating loads. Analysis indicates that combined heat and power systems can be operated to benefit both the end-users and the utility, providing more efficient electric generation as well as grid ancillary services, namely dispatchable urban power. Design and operating strategies considered in the paper include optimal sizing of the fuel cell, thermal energy storage to dispatch heat, and operating the fuel cell to provide flexible grid power. Analysis results indicate that with a 13.1% average increase in price-of-electricity (POE), the system can provide the grid with a 50% operating range of dispatchable urban power at an overall thermal efficiency of 80%. This grid-support operating mode increases the operational flexibility of the SOFC-CHP system, which may make the technology an important utility asset for accommodating the increased penetration of intermittent renewable power.
2007-11-01
Control Theory Perspective of Effects-Based Thinking and Operations Modelling “Operations” as a Feedback Control System Philip S. E... Theory Perspective of Effects-Based Thinking and Operations Modelling “Operations” as a Feedback Control System Philip S. E. Farrell...Abstract This paper explores operations that involve effects-based thinking (EBT) using Control Theory techniques in order to highlight the concept’s
Earth orbital teleoperator systems evaluation
NASA Technical Reports Server (NTRS)
Shields, N. L., Jr.; Slaughter, P. H.; Brye, R. G.; Henderson, D. E.
1979-01-01
The mechanical extension of the human operator to remote and specialized environments poses a series of complex operational questions. A technical and scientific team was organized to investigate these questions through conducting specific laboratory and analytical studies. The intent of the studies was to determine the human operator requirements for remotely manned systems and to determine the particular effects that various system parameters have on human operator performance. In so doing, certain design criteria based on empirically derived data concerning the ultimate control system, the human operator, were added to the Teleoperator Development Program.
The construction of power grid operation index system considering the risk of maintenance
NASA Astrophysics Data System (ADS)
Tang, Jihong; Wang, Canlin; Jiang, Xinfan; Ye, Jianhui; Pan, Feilai
2018-02-01
In recent years, large-scale blackout occurred at home and abroad caused widespread concern about the operation of the grid in the world, and the maintenance risk is an important indicator of grid safety. The barrier operation of the circuit breaker exists in the process of overhaul of the power grid. The operation of the different barrier is of great significance to the change of the power flow, thus affecting the safe operation of the system. Most of the grid operating status evaluation index system did not consider the risk of maintenance, to this end, this paper from the security, economy, quality and cleanliness of the four angles, build the power grid operation index system considering the risk of maintenance.
The Application of Architecture Frameworks to Modelling Exploration Operations Costs
NASA Technical Reports Server (NTRS)
Shishko, Robert
2006-01-01
Developments in architectural frameworks and system-of-systems thinking have provided useful constructs for systems engineering. DoDAF concepts, language, and formalisms, in particular, provide a natural way of conceptualizing an operations cost model applicable to NASA's space exploration vision. Not all DoDAF products have meaning or apply to a DoDAF inspired operations cost model, but this paper describes how such DoDAF concepts as nodes, systems, and operational activities relate to the development of a model to estimate exploration operations costs. The paper discusses the specific implementation to the Mission Operations Directorate (MOD) operational functions/activities currently being developed and presents an overview of how this powerful representation can apply to robotic space missions as well.
Mars outpost - System and operations challenges
NASA Technical Reports Server (NTRS)
Roberts, Barney; Guerra, Lisa
1990-01-01
The paper addresses the challenges inherent in establishing an outpost on the planet Mars. For background purposes, the unique, remote Martian environment and the developmental phases of a settlement in such an environment are discussed. Challenges are identified in terms of surface systems and operations. Due to its importance to habitability, the life support system (LSS) is highlighted with various options identified. Operations for the Mars outpost, earth-based and local, are characterized by a decentralized concept. The challenge of integrating logistics analysis early in system design and operations strategy is also addressed. In order to understand and reduce the system and operations challenges, the application of terrestrial and lunar testbeds is explained.
NASA Technical Reports Server (NTRS)
Dasgupta, Partha; Leblanc, Richard J., Jr.; Appelbe, William F.
1988-01-01
Clouds is an operating system in a novel class of distributed operating systems providing the integration, reliability, and structure that makes a distributed system usable. Clouds is designed to run on a set of general purpose computers that are connected via a medium-of-high speed local area network. The system structuring paradigm chosen for the Clouds operating system, after substantial research, is an object/thread model. All instances of services, programs and data in Clouds are encapsulated in objects. The concept of persistent objects does away with the need for file systems, and replaces it with a more powerful concept, namely the object system. The facilities in Clouds include integration of resources through location transparency; support for various types of atomic operations, including conventional transactions; advanced support for achieving fault tolerance; and provisions for dynamic reconfiguration.
Effects of extended lay-off periods on performance and operator trust under adaptable automation.
Chavaillaz, Alain; Wastell, David; Sauer, Jürgen
2016-03-01
Little is known about the long-term effects of system reliability when operators do not use a system during an extended lay-off period. To examine threats to skill maintenance, 28 participants operated twice a simulation of a complex process control system for 2.5 h, with an 8-month retention interval between sessions. Operators were provided with an adaptable support system, which operated at one of the following reliability levels: 60%, 80% or 100%. Results showed that performance, workload, and trust remained stable at the second testing session, but operators lost self-confidence in their system management abilities. Finally, the effects of system reliability observed at the first testing session were largely found again at the second session. The findings overall suggest that adaptable automation may be a promising means to support operators in maintaining their performance at the second testing session. Copyright © 2015 Elsevier Ltd and The Ergonomics Society. All rights reserved.
Utilization of Internet Protocol-Based Voice Systems in Remote Payload Operations
NASA Technical Reports Server (NTRS)
Best, Susan; Nichols, Kelvin; Bradford, Robert
2003-01-01
This viewgraph presentation provides an overview of a proposed voice communication system for use in remote payload operations performed on the International Space Station. The system, Internet Voice Distribution System (IVoDS), would make use of existing Internet protocols, and offer a number of advantages over the system currently in use. Topics covered include: system description and operation, system software and hardware, system architecture, project status, and technology transfer applications.
75 FR 3228 - Notice of Commission Staff Attendance at Midwest ISO Meetings
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-20
.... Docket No. ER08-1043, Midwest Independent Transmission System Operator, Inc. Docket No. ER08-1074... Transmission System Operator, Inc. Docket No. ER09-1074, Midwest Independent Transmission System Operator, Inc...
Evaluation of Vehicle Detection Systems for Traffic Signal Operations
DOT National Transportation Integrated Search
2016-10-16
Typical vehicle detection systems used in traffic signal operations are comprised of inductive loop detectors. Because of costs, installation challenges, and operation and maintenance issues, many alternative non-intrusive systems have been dev...
Navigation Operations for the Magnetospheric Multiscale Mission
NASA Technical Reports Server (NTRS)
Long, Anne; Farahmand, Mitra; Carpenter, Russell
2015-01-01
The Magnetospheric Multiscale (MMS) mission employs four identical spinning spacecraft flying in highly elliptical Earth orbits. These spacecraft will fly in a series of tetrahedral formations with separations of less than 10 km. MMS navigation operations use onboard navigation to satisfy the mission definitive orbit and time determination requirements and in addition to minimize operations cost and complexity. The onboard navigation subsystem consists of the Navigator GPS receiver with Goddard Enhanced Onboard Navigation System (GEONS) software, and an Ultra-Stable Oscillator. The four MMS spacecraft are operated from a single Mission Operations Center, which includes a Flight Dynamics Operations Area (FDOA) that supports MMS navigation operations, as well as maneuver planning, conjunction assessment and attitude ground operations. The System Manager component of the FDOA automates routine operations processes. The GEONS Ground Support System component of the FDOA provides the tools needed to support MMS navigation operations. This paper provides an overview of the MMS mission and associated navigation requirements and constraints and discusses MMS navigation operations and the associated MMS ground system components built to support navigation-related operations.
A Framework for Adaptable Operating and Runtime Systems
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sterling, Thomas
The emergence of new classes of HPC systems where performance improvement is enabled by Moore’s Law for technology is manifest through multi-core-based architectures including specialized GPU structures. Operating systems were originally designed for control of uniprocessor systems. By the 1980s multiprogramming, virtual memory, and network interconnection were integral services incorporated as part of most modern computers. HPC operating systems were primarily derivatives of the Unix model with Linux dominating the Top-500 list. The use of Linux for commodity clusters was first pioneered by the NASA Beowulf Project. However, the rapid increase in number of cores to achieve performance gain throughmore » technology advances has exposed the limitations of POSIX general-purpose operating systems in scaling and efficiency. This project was undertaken through the leadership of Sandia National Laboratories and in partnership of the University of New Mexico to investigate the alternative of composable lightweight kernels on scalable HPC architectures to achieve superior performance for a wide range of applications. The use of composable operating systems is intended to provide a minimalist set of services specifically required by a given application to preclude overheads and operational uncertainties (“OS noise”) that have been demonstrated to degrade efficiency and operational consistency. This project was undertaken as an exploration to investigate possible strategies and methods for composable lightweight kernel operating systems towards support for extreme scale systems.« less
Intelligent Systems Technologies for Ops
NASA Technical Reports Server (NTRS)
Smith, Ernest E.; Korsmeyer, David J.
2012-01-01
As NASA supports International Space Station assembly complete operations through 2020 (or later) and prepares for future human exploration programs, there is additional emphasis in the manned spaceflight program to find more efficient and effective ways of providing the ground-based mission support. Since 2006 this search for improvement has led to a significant cross-fertilization between the NASA advanced software development community and the manned spaceflight operations community. A variety of mission operations systems and tools have been developed over the past decades as NASA has operated the Mars robotic missions, the Space Shuttle, and the International Space Station. NASA Ames Research Center has been developing and applying its advanced intelligent systems research to mission operations tools for both unmanned Mars missions operations since 2001 and to manned operations with NASA Johnson Space Center since 2006. In particular, the fundamental advanced software development work under the Exploration Technology Program, and the experience and capabilities developed for mission operations systems for the Mars surface missions, (Spirit/Opportunity, Phoenix Lander, and MSL) have enhanced the development and application of advanced mission operation systems for the International Space Station and future spacecraft. This paper provides an update on the status of the development and deployment of a variety of intelligent systems technologies adopted for manned mission operations, and some discussion of the planned work for Autonomous Mission Operations in future human exploration. We discuss several specific projects between the Ames Research Center and the Johnson Space Centers Mission Operations Directorate, and how these technologies and projects are enhancing the mission operations support for the International Space Station, and supporting the current Autonomous Mission Operations Project for the mission operation support of the future human exploration programs.
Design and Realization of Silhouette Operation Platform Based on GIS
NASA Astrophysics Data System (ADS)
Fu, Jia; Cui, Xinqiang; Yuan, Zhengteng
2018-01-01
Artificial weather effects after several generations of unremitting efforts in many provinces, municipalities and districts have become a regular business to serve the community. In the actual operation of the actual impact of weather operations, onsite job terminal system functional integration is not high, such as the operation process cumbersome operation instructions unreasonable, the weather data lag, the data form of a single factor and other factors seriously affect the weather conditions, Sexual and intuitive improvement. Therefore, this paper adopts the Android system as the carrier for the design and implementation of the silhouette intelligent terminal system. The intelligent terminal system has carried on the preliminary deployment trial in the real-time intelligent command system which realizes the weather operation in a province, and has formed a centralized, unified and digital artificial influence in combination with the self-developed multi-function server system platform and the remote centre command system Weather operation communication network, to achieve intelligent terminal and remote centre commander between the efficient, timely and stable information exchange, improve the shadow of the economic and social benefits, basically reached the initial design purpose.
The Triangle of the Space Launch System Operations
NASA Astrophysics Data System (ADS)
Fayolle, Eric
2010-09-01
Firemen know it as “fire triangle”, mathematicians know it as “golden triangle”, sailormen know it as “Bermuda triangle”, politicians know it as “Weimar triangle”… This article aims to present a new aspect of that shape geometry in the space launch system world: “the triangle of the space launch system operations”. This triangle is composed of these three following topics, which have to be taken into account for any space launch system operation processing: design, safety and operational use. Design performance is of course taking into account since the early preliminary phase of a system development. This design performance is matured all along the development phases, thanks to consecutives iterations in order to respect the financial and timing constraints imposed to the development of the system. This process leads to a detailed and precise design to assess the required performance. Then, the operational use phase brings its batch of constraints during the use of the system. This phase is conducted by specific procedures for each operation. Each procedure has sequences for each sub-system, which have to be conducted in a very precise chronological way. These procedures can be processed by automatic way or manual way, with the necessity or not of the implication of operators, and in a determined environment. Safeguard aims to verify the respect of the specific constraints imposed to guarantee the safety of persons and property, the protection of public health and the environment. Safeguard has to be taken into account above the operational constraints of any space operation, without forgetting the highest safety level for the operators of the space operation, and of course without damaging the facilities or without disturbing the external environment. All space operations are the result of a “win-win” compromise between these three topics. Contrary to the fire triangle where one of the topics has to be suppressed in order to avoid the combustion, no topics at all should be suppressed in the triangle of the space launch system operations. Indeed, if safeguard is not considered since the beginning of the development phase, this development will not take into account safeguard constraints. Then, the operational phase will become very difficult because unavailable, to respect safety rules required for the operational use phase of the system. Taking into account safeguard constraints in late project phases will conduct to very high operational constraints, sometimes quite disturbing for the operator, even blocking to be able to consider the operational use phase as mature and optimized. On the contrary, if design performance is not taken into account in order to favor safeguard aspect in the operational use phase, system design will not be optimized, what will lead to high planning and timing impacts. The examples detailed in this article show the compromise for what each designer should confront with during the development of any system dealing with the safety of persons and property, the protection of public health and the environment.
Optimization of wastewater treatment plant operation for greenhouse gas mitigation.
Kim, Dongwook; Bowen, James D; Ozelkan, Ertunga C
2015-11-01
This study deals with the determination of optimal operation of a wastewater treatment system for minimizing greenhouse gas emissions, operating costs, and pollution loads in the effluent. To do this, an integrated performance index that includes three objectives was established to assess system performance. The ASMN_G model was used to perform system optimization aimed at determining a set of operational parameters that can satisfy three different objectives. The complex nonlinear optimization problem was simulated using the Nelder-Mead Simplex optimization algorithm. A sensitivity analysis was performed to identify influential operational parameters on system performance. The results obtained from the optimization simulations for six scenarios demonstrated that there are apparent trade-offs among the three conflicting objectives. The best optimized system simultaneously reduced greenhouse gas emissions by 31%, reduced operating cost by 11%, and improved effluent quality by 2% compared to the base case operation. Copyright © 2015 Elsevier Ltd. All rights reserved.
Operational models of infrastructure resilience.
Alderson, David L; Brown, Gerald G; Carlyle, W Matthew
2015-04-01
We propose a definition of infrastructure resilience that is tied to the operation (or function) of an infrastructure as a system of interacting components and that can be objectively evaluated using quantitative models. Specifically, for any particular system, we use quantitative models of system operation to represent the decisions of an infrastructure operator who guides the behavior of the system as a whole, even in the presence of disruptions. Modeling infrastructure operation in this way makes it possible to systematically evaluate the consequences associated with the loss of infrastructure components, and leads to a precise notion of "operational resilience" that facilitates model verification, validation, and reproducible results. Using a simple example of a notional infrastructure, we demonstrate how to use these models for (1) assessing the operational resilience of an infrastructure system, (2) identifying critical vulnerabilities that threaten its continued function, and (3) advising policymakers on investments to improve resilience. © 2014 Society for Risk Analysis.
Operational Impacts of Operating Reserve Demand Curves on Production Cost and Reliability
DOE Office of Scientific and Technical Information (OSTI.GOV)
Krad, Ibrahim; Ibanez, Eduardo; Ela, Erik
The electric power industry landscape is continually evolving. As emerging technologies such as wind, solar, electric vehicles, and energy storage systems become more cost-effective and present in the system, traditional power system operating strategies will need to be reevaluated. The presence of wind and solar generation (commonly referred to as variable generation) may result in an increase in the variability and uncertainty of the net load profile. One mechanism to mitigate this is to schedule and dispatch additional operating reserves. These operating reserves aim to ensure that there is enough capacity online in the system to account for the increasedmore » variability and uncertainty occurring at finer temporal resolutions. A new operating reserve strategy, referred to as flexibility reserve, has been introduced in some regions. A similar implementation is explored in this paper, and its implications on power system operations are analyzed.« less