Code of Federal Regulations, 2011 CFR
2011-07-01
... 31 Money and Finance: Treasury 1 2011-07-01 2011-07-01 false Final action. 92.17 Section 92.17... Words, Letters, Symbols, or Emblems of the United States Mint § 92.17 Final action. (a) In making a... Notice of Assessment (or on demand under paragraph (c)(3)(ii)(D) of this section), a civil action to...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-04
... on the Interchange of State Loop 1604 and United States Highway 281 in Texas AGENCY: Federal Highway... agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project, the interchange of Texas State Loop 1604 (LP 1604) with United States Highway 281 (US 281...
37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.
Code of Federal Regulations, 2014 CFR
2014-07-01
... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES... patent owner to a non-final Office action. (a)(1) If the Office action after the first examination (§ 1...
37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.
Code of Federal Regulations, 2013 CFR
2013-07-01
... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES... patent owner to a non-final Office action. (a)(1) If the Office action after the first examination (§ 1...
37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.
Code of Federal Regulations, 2011 CFR
2011-07-01
... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES... patent owner to a non-final Office action. (a)(1) If the Office action after the first examination (§ 1...
37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.
Code of Federal Regulations, 2012 CFR
2012-07-01
... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES... patent owner to a non-final Office action. (a)(1) If the Office action after the first examination (§ 1...
37 CFR 1.111 - Reply by applicant or patent owner to a non-final Office action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... owner to a non-final Office action. 1.111 Section 1.111 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN PATENT CASES... patent owner to a non-final Office action. (a)(1) If the Office action after the first examination (§ 1...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-19
... Final EIS: Biological resources, cultural resources, water resources, land use, socioeconomic resources... INTERNATIONAL BOUNDARY AND WATER COMMISSION, UNITED STATES AND MEXICO United States Section..., International Boundary and Water Commission (USIBWC). ACTION: Notice of Availability of Final Environmental...
77 FR 48586 - Notice of Final Federal Agency Actions on United States Highway 77
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-14
.... Sec. 139(l)(1). The actions relate to a proposed highway project, United States (US) 77, extending from Interstate Highway 37 (IH 37) in Corpus Christi, Texas to US 83 in Harlingen, Texas. Those actions..., permits, and approvals for the following highway project in the State of Texas: United States highway (US...
76 FR 41554 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-14
... actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on... of Limitation on Claims for Judicial Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 327, the United States Fish and Wildlife Service (USFWS), and the United...
Establishing Final Cleanup Decisions for the Hanford Site River Corridor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lerch, J.A.; Sands, J.P.
2007-07-01
A major challenge in the River Corridor Closure Contract is establishing final cleanup decisions for the source operable units in the Hanford Site river corridor. Cleanup actions in the river corridor began in 1994 and have been performed in accordance with a 'bias for action' approach adopted by the Tri-Parties - the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology. This approach enabled early application of cleanup dollars on actual remediation of contaminated waste sites. Consequently, the regulatory framework authorizing cleanup actions at source operable units in the river corridor consists largely of interimmore » action records of decision, which were supported by qualitative risk assessments. Obtaining final cleanup decisions for the source operable units is necessary to determine whether past cleanup actions in the river corridor are protective of human health and the environment and to identify any course corrections that may be needed to ensure that ongoing and future cleanup actions are protective. Because the cleanup actions are ongoing, it is desirable to establish the final cleanup decisions as early as possible to minimize the impacts of any identified course corrections to the present cleanup approach. Development of a strategy to obtain final cleanup decisions for the source operable units in a manner that is responsive to desires for an integrated approach with the groundwater and Columbia River components while maintaining the ability to evaluate each component on its own merit represents a significant challenge. There are many different options for grouping final cleanup decisions, and each involved party or stakeholder brings slightly different interests that shape the approach. Regardless of the selected approach, there are several specific challenges and issues to be addressed before making final cleanup decisions. A multi-agency and contractor working group has been established to address these issues and develop an endorsed strategy. Ultimately, it is anticipated that the Tri-Parties will establish a set of milestones to document pathway selection and define schedule requirements. (authors)« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-08
... INTERNATIONAL BOUNDARY AND WATER COMMISSION, UNITED STATES AND MEXICO Notice of Availability of..., International Boundary and Water Commission, United States and Mexico (USIBWC). ACTION: Notice of Availability... Council on Environmental Quality Final Regulations (40 CFR Parts 1500 through 1508), and the United States...
21 CFR 10.45 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 12. (b) A request that the Commissioner take or refrain from taking any form of administrative action... review of final agency action; and (iii) It is not appropriate to move to dismiss a suit for... that it is an unconsented suit against the United States if the defect could be cured by amending the...
21 CFR 10.45 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 12. (b) A request that the Commissioner take or refrain from taking any form of administrative action... review of final agency action; and (iii) It is not appropriate to move to dismiss a suit for... that it is an unconsented suit against the United States if the defect could be cured by amending the...
21 CFR 10.45 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 12. (b) A request that the Commissioner take or refrain from taking any form of administrative action... review of final agency action; and (iii) It is not appropriate to move to dismiss a suit for... that it is an unconsented suit against the United States if the defect could be cured by amending the...
21 CFR 10.45 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 12. (b) A request that the Commissioner take or refrain from taking any form of administrative action... review of final agency action; and (iii) It is not appropriate to move to dismiss a suit for... that it is an unconsented suit against the United States if the defect could be cured by amending the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 31 Money and Finance: Treasury 1 2010-07-01 2010-07-01 false Final action. 92.17 Section 92.17 Money and Finance: Treasury Regulations Relating to Money and Finance UNITED STATES MINT OPERATIONS AND... suspend the payment of all or some of the civil penalty, conditioned on the violator's future compliance...
78 FR 11645 - Agency Information Collection Activities: Final Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-19
... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice 2013-0115] Agency Information Collection Activities: Final Collection; Comment Request AGENCY: Export-Import Bank of the United States. ACTION...-Im Bank approved insurance claims. Affected Public: This form affects entities involved in the export...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-18
... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0059] Application for Final...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-18
... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0023] Application for Final...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-12
... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0027] Application for Final...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-12
... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2012-0546] Application for Final...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-22
... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0028] Application for Final...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-19
... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0024] Application for Final...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-12
... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0045] Application for Final...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-27
... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0049] Application for Final... AGENCY: Export-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-07
... DEPARTMENT OF THE INTERIOR United States Geological Survey Notice of Availability of the Final... AGENCY: United States Geological Survey, Interior. ACTION: Notice of Availability (NOA). SUMMARY: In... systems consisting of internal sprinkler systems designed to fit each building's unique layout, function...
46 CFR 204.5 - Notification to claimant of action on claim.
Code of Federal Regulations, 2011 CFR
2011-10-01
... releasing the United States, its agents and employees from all further claims relating to the incident giving rise to the approved claim. (b) If the claim is finally denied, the official vested with such... with the action may institute suit against the United States not later than six months after the date...
75 FR 20774 - Modification of Jet Routes J-37 and J-55; Northeast United States
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-21
... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 71 [Docket No. FAA-2010-0003; Airspace Docket No. 09-ANE-104] Modification of Jet Routes J-37 and J-55; Northeast United States AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action modifies Jet...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-14
... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0101] Application for Final..., AP078595XB AGENCY: Export-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-08
... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice 2012-0558] Application for Final Commitment...-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice: 2013-0060] Application for Final... AP088412XB AGENCY: Export-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United...
37 CFR 1.116 - Amendments and affidavits or other evidence after final action and prior to appeal.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Amendments and affidavits or other evidence after final action and prior to appeal. 1.116 Section 1.116 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN...
37 CFR 1.116 - Amendments and affidavits or other evidence after final action and prior to appeal.
Code of Federal Regulations, 2014 CFR
2014-07-01
... 37 Patents, Trademarks, and Copyrights 1 2014-07-01 2014-07-01 false Amendments and affidavits or other evidence after final action and prior to appeal. 1.116 Section 1.116 Patents, Trademarks, and Copyrights UNITED STATES PATENT AND TRADEMARK OFFICE, DEPARTMENT OF COMMERCE GENERAL RULES OF PRACTICE IN...
5 CFR 1201.127 - Judicial review.
Code of Federal Regulations, 2010 CFR
2010-01-01
... PROCEDURES Procedures for Original Jurisdiction Cases Special Counsel Disciplinary Actions § 1201.127 Judicial review. (a) An employee subject to a final Board decision imposing disciplinary action under 5 U.S... appropriate United States district court. 5 U.S.C. 1508. Special Counsel Corrective Actions ...
77 FR 57010 - Modification of Area Navigation (RNAV) Route Q-62; Northeast United States
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-17
...; Northeast United States AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY... proposed rulemaking to modify RNAV route Q-62 in Northeast United States by extending it further west (77...
77 FR 35679 - Agency Information Collection Activities: Final Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-14
... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice 2012-0134] Agency Information Collection Activities: Final Collection; Comment Request AGENCY: Export-Import Bank of the U.S. ACTION: Submission for...: The Export-Import Bank of the United States (Ex-Im Bank), as a part of its continuing effort to reduce...
32 CFR 536.62 - Action memorandums.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 3 2011-07-01 2009-07-01 true Action memorandums. 536.62 Section 536.62... AGAINST THE UNITED STATES Investigation and Processing of Claims § 536.62 Action memorandums. (a) When... claims on which suit is filed before final action, see § 536.66. A settlement authority may deny or pay...
32 CFR 536.62 - Action memorandums.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 3 2010-07-01 2010-07-01 true Action memorandums. 536.62 Section 536.62... AGAINST THE UNITED STATES Investigation and Processing of Claims § 536.62 Action memorandums. (a) When... claims on which suit is filed before final action, see § 536.66. A settlement authority may deny or pay...
Final voluntary release assessment/corrective action report
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-11-12
The US Department of Energy, Carlsbad Area Office (DOE-CAO) has completed a voluntary release assessment sampling program at selected Solid Waste Management Units (SWMUs) at the Waste Isolation Pilot Plant (WIPP). This Voluntary Release Assessment/Corrective Action (RA/CA) report has been prepared for final submittal to the Environmental protection Agency (EPA) Region 6, Hazardous Waste Management Division and the New Mexico Environment Department (NMED) Hazardous and Radioactive Materials Bureau to describe the results of voluntary release assessment sampling and proposed corrective actions at the SWMU sites. The Voluntary RA/CA Program is intended to be the first phase in implementing the Resourcemore » Conservation and Recovery Act (RCRA) Facility Investigation (RFI) and corrective action process at the WIPP. Data generated as part of this sampling program are intended to update the RCRA Facility Assessment (RFA) for the WIPP (Assessment of Solid Waste Management Units at the Waste Isolation Pilot Plant), NMED/DOE/AIP 94/1. This Final Voluntary RA/CA Report documents the results of release assessment sampling at 11 SWMUs identified in the RFA. With this submittal, DOE formally requests a No Further Action determination for these SWMUs. Additionally, this report provides information to support DOE`s request for No Further Action at the Brinderson and Construction landfill SWMUs, and to support DOE`s request for approval of proposed corrective actions at three other SWMUs (the Badger Unit Drill Pad, the Cotton Baby Drill Pad, and the DOE-1 Drill Pad). This information is provided to document the results of the Voluntary RA/CA activities submitted to the EPA and NMED in August 1995.« less
This page describes the interim final rule that will allow owners or operators of electric generating units to submit to EPA electronic emissions and compliance reports for the Mercury and Air Toxics rule.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-06-03
This Decision Document discusses the selection of no further action as the recommended action for four sites located at the Oliktok Point radar installation. The United States Air Force (Air Force) completed a Remedial Investigation/Feasibility Study and a Risk Assessment for the eight sites located at the Oliktok Point installation (U.S. Air Force 1996a,b). Based on the findings of these activities, four sites are recommended for no further action.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-13
...This action finalizes amendments to the federal plan and the new source performance standards for hospital/medical/infectious waste incinerators. This final action implements national standards promulgated in the 2009 amendments to the hospital/medical/infectious waste incinerator emissions guidelines that will result in reductions in emissions of certain pollutants from all affected units.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-13
... INTERNATIONAL BOUNDARY AND WATER COMMISSION, UNITED STATES AND MEXICO United States Section... States Section, International Boundary and Water Commission, United States and Mexico (USIBWC). ACTION... States Section, International Boundary and Water Commission; 4171 N. Mesa, C-100; El Paso, Texas 79902...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Closure Report (CR) presents information supporting the clean closure of Corrective Action Unit (CAU) 412: Clean Slate I Plutonium Dispersion (TTR), located on the Tonopah Test Range, Nevada. CAU 412 consists of a release of radionuclides to the surrounding soil from a storage–transportation test conducted on May 25, 1963. Corrective action investigation (CAI) activities were performed in April and May 2015, as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 412: Clean Slate I Plutonium Dispersion (TTR), Tonopah Test Range, Nevada; and in accordance with the Soils Activity Quality Assurance Plan. Themore » purpose of the CAI was to fulfill data needs as defined during the data quality objectives process. The CAU 412 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the data needs identified by the data quality objectives process. This CR provides documentation and justification for the clean closure of CAU 412 under the FFACO without further corrective action. This justification is based on historical knowledge of the site, previous site investigations, implementation of the 1997 interim corrective action, and the results of the CAI. The corrective action of clean closure was confirmed as appropriate for closure of CAU 412 based on achievement of the following closure objectives: Radiological contamination at the site is less than the final action level using the ground troops exposure scenario (i.e., the radiological dose is less than the final action level): Removable alpha contamination is less than the high contamination area criterion: No potential source material is present at the site, and any impacted soil associated with potential source material has been removed so that remaining soil contains contaminants at concentrations less than the final action levels: and There is sufficient information to characterize investigation and remediation waste for disposal.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.; Madden, J.; Borsetti, R.
1996-05-03
This Decision Document discusses the selection of no further action as the recommended action for nine sites located at the Barter Island radar installation. The United States Air Force (Air Force) completed a Remedial Investigation/Feasibility Study and a Risk Assessment for the 14 sites located at the Barter Island installation (U.S. Air Force 1996a,b). Based on the findings of these activities, nine sites are recommended for no further action.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action for the Million Gallon Hill source area of the Installation Restoration Program (IRP) site ST009, otherwise known as the West Unit at Galena Airport, Alaska. The information from the RI Report is summarized, along with an analysis of potential removal action alternatives in the Engineering Evaluation/Cost Analysis (EE/CA).
10 CFR 1014.10 - Action on approved claims.
Code of Federal Regulations, 2010 CFR
2010-01-01
... against the United States and against any employee of the Government whose act or omission gave rise to... 2677 of title 28, United States Code, that acceptance shall be final and conclusive on the claimant...
75 FR 61175 - Polyvinyl Alcohol From Taiwan
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-04
... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-1088 (Final)] Polyvinyl Alcohol From Taiwan AGENCY: United States International Trade Commission. ACTION: Scheduling of the final phase of an... antidumping investigation No. 731-TA-1088 (Final) under section 735(b) of the Tariff Act of 1930 (19 U.S.C...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This decision document represents the United States Environmental Protection Agency`s (US EPA) selected final remedial action for the Site located in Woodstock, Illinois. The US EPA, in consultation with the IEPA, is modifying the landfill cap profile, and the requirement to construct a groundwater pump-and-treat system to address residual vinyl chloride contamination in the upper water-bearing unit, down gradient of the landfill. This remedy is intended to be the final action for the site, and addresses all contaminated media, including: contaminated soil, sediment, and groundwater, landfilled wastes, leachate generation and emission of landfill gases.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-30
.... The publication of this action is part of a Court-approved joint motion to stay pending litigation...), National Oceanic and Atmospheric Administration (NOAA), Commerce. ACTION: Final rule. SUMMARY: Through this action, NMFS removes a regulatory exemption for midwater trawl herring vessels, which was originally...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This decision document represents the selected remedial action for Operable Unit (OU) No. 2 at the Spickler Landfill Superfund Site (the Site) in Specer, Wisconsin. The United States Environmental Protection Agency (US EPA) has found that no further action is appropriate due to the effectiveness of the remedial action for the first operable unit. Proper closure of the landfills and mercury brine pit, installation of a landfill gas collection and flare and leachate collection systems and continued operation have eliminated the primary human health risk posed by direct contact with contaminated soils, eliminated the threat to the environment, and mitigatedmore » the primary human health risk posed by contaminated Site groundwater and landfill gas. The remedy established by this ROD is the final Remedial Action for this Site.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-12
... DEPARTMENT OF JUSTICE Antitrust Division United States v. Chiropractic Associates, Ltd. of South... proposed Final Judgment in United States v. Chiropractic Associates, Ltd. of South Dakota., Civil Action No... SOUTH DAKOTA SOUTHERN DIVISION UNITED STATES OF AMERICA, Plaintiff, v. CHIROPRACTIC ASSOCIATES, LTD. OF...
78 FR 35989 - Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-14
... Bar Nuclear Plant, Unit 2 AGENCY: Nuclear Regulatory Commission. ACTION: Final environmental statement... Operation of Watts Bar Nuclear Plant (WBN), Unit 2'' (SFES). ADDRESSES: Please refer to Docket ID NRC-2008... option of issuing the operating license for Watts Bar Nuclear Plant, Unit 2. This recommendation is based...
Superfund record of decision (EPA Region 5): Skinner Landfill, West Chester, OH, June 1993
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-06-04
The decision document presents the selected final remedial action for the Skinner Landfill site in West Chester, Ohio. The remedy is the second and final of two operable units for this site. The first operable unit addressed immediate site concerns, through the construction of a fence around the contaminated area, and by offering an alternate supply of drinking water to the potentially affected users of groundwater. This final operable unit addresses potential future migration of site contaminants into the groundwater and will limit the potential for direct exposure of site contaminants to humans through source control measures.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-19
... INTERNATIONAL TRADE COMMISSION [Investigation No. 1205-8] Certain Footwear: Recommendations for Modifying the Harmonized Tariff Schedule of the United States AGENCY: United States International Trade Commission. ACTION: Change in date for transmitting final recommendations to the President. SUMMARY: The...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-08
... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice 2012-0345] Application for Final Commitment...: Export-Import Bank of the U.S. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10) of the Charter of the Export-Import Bank of the United States (``Ex-Im Bank...
76 FR 37261 - Establishment of Helicopter Area Navigation (RNAV) Routes; Northeast United States
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-27
...; Northeast United States AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY...) structure and designates two helicopter RNAV routes (TK-routes) in the northeast corridor between the... Register a notice of proposed rulemaking to establish two helicopter RNAV routes in Northeast United States...
78 FR 29618 - Rules of Adjudication and Enforcement
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-21
... INTERNATIONAL TRADE COMMISSION 19 CFR Part 210 Rules of Adjudication and Enforcement AGENCY: International Trade Commission. ACTION: Final rule. SUMMARY: The United States International Trade Commission... the General Counsel, United States International Trade Commission. Hearing-impaired individuals are...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
2011-02-24
This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-08-01
The decision document presents the selected remedial action for the Standard Steel and Metals Salvage Yard, in Anchorage, Alaska. This is the final remedial action for the site. The site was not divided into operable units. The Removal Action utilized treatment as a principle element for the principle sources.
78 FR 33890 - Limitation on Claims Against Proposed Public Transportation Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-05
... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...
78 FR 4191 - Limitation on Claims Against Proposed Public Transportation Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...
78 FR 16764 - Limitation on Claims Against Proposed Public Transportation Projects
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-18
... DEPARTMENT OF TRANSPORTATION Federal Transit Administration Limitation on Claims Against Proposed Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... advising the public of final agency actions subject to Section 139(l) of Title 23, United States Code (U.S...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-17
... EXPORT-IMPORT BANK OF THE UNITED STATES 12 CFR Part 404 [EXIM-OIG-2012-0010] RIN 3048-AA02 Privacy Act of 1974: Implementation of Exemptions; Export-Import Bank of the United States Office of Inspector..., Export-Import Bank of the United States. ACTION: Final rule. SUMMARY: The Export-Import Bank of the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Karmi, S.
1996-05-24
This Decision Document discusses the selection of no further action as the recommended action for two sites located at the Bullen Point radar installation. The United States Air Force (Air Force) completed a Remedial Investigation/Feasibility Study and a Risk Assessment for the five sites located at the Bullen Point installation (U.S. Air Force 1996a,b). Based on the findings of these activities, two sites are recommended for no further action. Sites at the Bullen Point radar installation recommended for no further action are: Old Landfill/Dump Site East (LF06) and Drum Storage Area (SS10).
78 FR 283 - United States Standards for Grades of Eggplant
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-03
... that permitting mixed colors and/or type packs will facilitate the marketing of eggplant by providing... DEPARTMENT OF AGRICULTURE Agricultural Marketing Service [Doc. Number FV-11-0052] United States Standards for Grades of Eggplant AGENCY: Agricultural Marketing Service, USDA. ACTION: Final notice. SUMMARY...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
2003-08-06
This report presents the technical information developed since the interim record of decision (IROD) was issued in September 2000 (U.S. Department of Energy [DOE] 2000). The information was incorporated into the evaluation that was performed in selecting the preferred alternative for the Chemical Plant groundwater operable unit (GWOU) of the Weldon Spring site. The contaminants of concern (COCs) in groundwater and springs are trichloroethylene (TCE), nitrate, uranium, and nitroaromatic compounds. The preferred alternative of monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities is described in the ''Proposed Plan (PP) for Final Remedial Action for the Groundwatermore » Operable Unit at the Chemical Plant Area of the Weldon Spring Site, Weldon Spring, Missouri'' (DOE 2003b).« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-15
... DEPARTMENT OF JUSTICE Antitrust Division United States, et al. v. Election Systems and Software... Columbia in United States, et al. v. Election Systems and Software Inc., Civil Action No. 10-00380. On... Systems and Software, Inc., (``ES&S'') of Premier Election Services, Inc., and PES Holdings, Inc. violated...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-03
... proposed action may include issuing exemptions to nuclear power plant licensees for up to 40 nuclear power.... Fitzpatrick Nuclear Power Plant Joseph M. Farley Nuclear Plant, Units 1 and 2 Millstone Power Station, Unit... Palisades Nuclear Plant Palo Verde Nuclear Generating Station, Units 1, 2, and 3 Perry Nuclear Power Plant...
75 FR 52940 - Final Notice of Data Availability Concerning 2010 CAIR NOX
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-30
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9194-6] Final Notice of Data Availability Concerning 2010 CAIR NO X Annual Trading Program New Unit Set-Aside Allowance Allocations Under the Clean Air....153(e). FOR FURTHER INFORMATION CONTACT: Questions concerning this action should be addressed to...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action to address potential trichloroethene (TCE) impact to drinking water supply wells, located in the Installation Restoration Program (IRP) site ST009, otherwise known as the West Unit, at Galena Airport, Alaska. The information fron the RI Report is summarized, along with an analysis of potential removal action alternatives, in the Engineering Evaluation/Cost Analysis (EE/CA).
75 FR 59611 - Iranian Transactions Regulations
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-28
... Regulations AGENCY: Office of Foreign Assets Control, Treasury. ACTION: Final rule. SUMMARY: The Department of... United States of, and dealings in, certain foodstuffs and carpets of Iranian origin and related services... importation of goods or services of Iranian origin directly or indirectly into the United States and on the...
78 FR 63158 - United States Standards for Grades of Okra
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-23
...: Agricultural Marketing Service, USDA. ACTION: Final notice. SUMMARY: The Agricultural Marketing Service (AMS) of the Department of Agriculture (USDA) is revising the voluntary United States Standards for Grades... available on the Specialty Crops Inspection Division Web site at www.ams.usda.gov/scihome . SUPPLEMENTARY...
No Further Action Decision Under Cercla Study Area 61Z Building 202 Historic Motor Pool
2000-01-01
appropriate response actions are implemented at Fort Devens under CERCLA. AOC 61Z is the former site of a motor pool at the corner of Carey and St. Mihiel...provided recommendations for response actions with the objective of identifying priorities for environmental restoration at Fort Devens . Areas...a final permit that included a list of Solid Waste Management Units requiring corrective action . In December 1989, Fort Devens was placed on the
26 CFR 301.7481-1 - Date when Tax Court decision becomes final; decision modified or reversed.
Code of Federal Regulations, 2010 CFR
2010-04-01
... the Supreme Court directs that the decision of the Tax Court be modified or reversed, the decision of... 26 Internal Revenue 18 2010-04-01 2010-04-01 false Date when Tax Court decision becomes final... Proceedings Civil Actions by the United States § 301.7481-1 Date when Tax Court decision becomes final...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-06
... Visa Classifications; Final Rule #0;#0;Federal Register / Vol. 78, No. 215 / Wednesday, November 6... Family'' for Certain Nonimmigrant Visa Classifications AGENCY: Department of State. ACTION: Final rule... classifications and also applies to foreign government officials who may be admitted in immediate and continuous...
77 FR 35679 - Agency Information Collection Activities: Final Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-14
... EXPORT-IMPORT BANK OF THE UNITED STATES [Public Notice 2012-0136] Agency Information Collection Activities: Final Collection; Comment Request AGENCY: Export-Import Bank of the U.S. ACTION: Submission for... Financial Institution of Medium Term Export Credit Insurance Policy. SUMMARY: The Export-Import Bank of the...
75 FR 36654 - Final Notice of Data Availability Concerning 2010 CAIR NOX
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-28
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9168-6] Final Notice of Data Availability Concerning 2010 CAIR NOX Ozone Season Trading Program New Unit Set-Aside Allowance Allocations Under the Clean Air... INFORMATION CONTACT: Questions concerning this action should be addressed to Robert L. Miller, U.S...
75 FR 7029 - Notice of Availability of the Final Environmental Assessment for Solar Roof Project
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-16
... Assessment for Solar Roof Project AGENCY: United States Geological Survey. ACTION: Notice of availability... Final Environmental Assessment for the Solar Roof Project and by this notice is announcing its... Individuals wishing to receive copies of the Environmental Assessment for the Solar Roof Project should...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-21
...This action promulgates EPA's final response to the 2001 voluntary remand of the December 1, 2000, new source performance standards and emission guidelines for commercial and industrial solid waste incineration units and the vacatur and remand of several definitions by the District of Columbia Circuit Court of Appeals in 2007. In addition, this action includes the 5-year technology review of the new source performance standards and emission guidelines required under section 129 of the Clean Air Act. This action also promulgates other amendments that EPA believes are necessary to address air emissions from commercial and industrial solid waste incineration units.
75 FR 11557 - Woven Electric Blankets From China
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-11
... From China AGENCY: United States International Trade Commission. ACTION: Scheduling of the final phase... States is materially retarded, by reason of less-than-fair-value imports from China of woven electric... blankets from the People's Republic of China are being sold in the United States at less than fair value...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-24
... Attorney General, Civil Division, to Branch Directors, Heads of Offices and United States Attorneys in Civil Division Cases AGENCY: Office of the Assistant Attorney General, Civil Division, Department of Justice. ACTION: Final rule. SUMMARY: This final rule amends Civil Directive 14-95, published in the...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-22
... INTERNATIONAL TRADE COMMISSION [Investigation Nos. 701-TA-486 and 731-TA-1195-1196 (Final... Antidumping Investigations AGENCY: United States International Trade Commission. ACTION: Notice. SUMMARY: The...: Nathanael Comly (202-205-3174), Office of Investigations, U.S. International Trade Commission, 500 E Street...
77 FR 37041 - Agency Information Collection Activities: Final Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-20
... EXPORT-IMPORT BANK OF THE U.S. [Public Notice 2012-0111] Agency Information Collection Activities: Final Collection; Comment Request AGENCY: Export-Import Bank of the U.S. ACTION: Submission for OMB... Credit Insurance Policy. SUMMARY: The Export-Import Bank of the United States (Ex-Im Bank), as a part of...
77 FR 76036 - Agency Information Collection Activities: Final Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-26
... EXPORT-IMPORT BANK OF THE U.S. [Public Notice 2012-0555] Agency Information Collection Activities: Final Collection; Comment Request AGENCY: Export-Import Bank of the U.S. ACTION: Submission for OMB.... SUMMARY: The Export-Import Bank of the United States (Ex-Im Bank), as a part of its continuing effort to...
77 FR 16549 - Agency Information Collection Activities: Final Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-21
... EXPORT-IMPORT BANK OF THE U.S. [Public Notice 2012-0087] Agency Information Collection Activities: Final Collection; Comment Request AGENCY: Export-Import Bank of the U.S. ACTION: Submission for OMB... Credit Insurance Policy. SUMMARY: The Export-Import Bank of the United States (Ex-Im Bank), as a part of...
78 FR 62367 - Changes To Implement the Patent Law Treaty
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-21
... Office 37 CFR Parts 1, 3 and 11 Changes To Implement the Patent Law Treaty; Final Rule #0;#0;Federal... 0651-AC85 Changes To Implement the Patent Law Treaty AGENCY: United States Patent and Trademark Office, Commerce. ACTION: Final rule. SUMMARY: The Patent Law Treaties Implementation Act of 2012 (PLTIA) amends...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-04
... significant but mitigable impacts to water resources at YTC. At PCMS, cumulative impacts to soils are... training and force management. The Final PEIS evaluates the environmental impacts associated with the... integrated training with ground units. Land acquisition is not being considered as part of this action...
76 FR 4110 - Agency Information Collection Activities: Final Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-24
... EXPORT-IMPORT BANK OF THE U.S. [Public Notice 2011-0002] Agency Information Collection Activities: Final Collection; Comment Request AGENCY: Export-Import Bank of the U.S. ACTION: Submission for OMB...-Import Bank of the United States (Ex-Im Bank), as a part of its continuing effort to reduce paperwork and...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-23
... global warming, through regulations that will harm the economy of the United States,'' and asserts that EPA is attempting to take such action on the issue of global warming which Congress has ``decided that... purpose of addressing global warming. IV. Final Action EPA is approving Pennsylvania's adoption of the CTG...
24 CFR 17.12 - Action on approved claim.
Code of Federal Regulations, 2010 CFR
2010-04-01
... section 2672 or 2677 of Title 28, United States Code, is final and conclusive on the claimant, his agent... presented, and constitutes a complete release of any claim against the United States and against any officer or employee of the Government whose act or omission gave rise to the claim, by reason of the same...
24 CFR 17.12 - Action on approved claim.
Code of Federal Regulations, 2011 CFR
2011-04-01
... section 2672 or 2677 of Title 28, United States Code, is final and conclusive on the claimant, his agent... presented, and constitutes a complete release of any claim against the United States and against any officer or employee of the Government whose act or omission gave rise to the claim, by reason of the same...
31 CFR 3.7 - Action on approved claims.
Code of Federal Regulations, 2010 CFR
2010-07-01
... of section 2672 or 2677 of title 28, United States Code, shall be final and conclusive on the... claim has been presented, and shall constitute a complete release of any claim against the United States and against any employee of the Government whose act or omission gave rise to the claim, by reason of...
77 FR 42428 - Amendment of Jet Routes and VOR Federal Airways; Northeastern United States
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-19
... DEPARTMENT OF TRANSPORTATION Federal Aviation Administration 14 CFR Part 71 Docket No. FAA-2012-0622; Airspace Docket No. 12-ANE-11 RIN 2120-AA66 Amendment of Jet Routes and VOR Federal Airways; Northeastern United States AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule; technical...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-20
... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-247 and 50-286; NRC-2008-0672] License Renewal Application for Indian Point Nuclear Generating Units 2 and 3; Entergy Nuclear Operations, Inc. AGENCY: Nuclear Regulatory Commission. ACTION: License renewal application; intent to prepare supplement to final...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-29
... DEPARTMENT OF COMMERCE Patent and Trademark Office 37 CFR Part 1 [Docket No.: PTO-P-2010-0092] RIN... Timing Control Procedures AGENCY: United States Patent and Trademark Office, Commerce. ACTION: Final rule... Trademark Office (Office) published a final rule that revises the rules of practice in patent cases to...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-04-01
This decision document presents the selected interim remedial action for the T H Agriculture and Nutrition (THAN) Site, Montgomery, Alabama. This interim remedial action employs the use of extraction wells combined with a pump and treat system to prevent further migration of contaminated groundwater from the Site and to initiate groundwater restoration pending completion of the RI/FS and implementation of the final remedial action.
43 CFR 429.37 - Does interest accrue on monies owed to the United States during my appeal process?
Code of Federal Regulations, 2010 CFR
2010-10-01
... United States during my appeal process? 429.37 Section 429.37 Public Lands: Interior Regulations Relating... States during my appeal process? Except for any period in the appeal process during which a stay is then... decision to OHA, or during judicial review of final agency action. ...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Jeremy Gwin and Douglas Frenette
This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 – Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values andmore » corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or “clean,” building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, “Final Status Survey Plan for Corrective Action Unit 117 – Pluto Disassembly Facility, Building 2201”) was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual room into one of three categories: Class 1, Class 2 or Class 3 (a fourth category is a “Non-Impacted Class” which in the case of Building 2201 only pertained to exterior surfaces of the building.) The majority of the rooms were determined to fall in the less restrictive Class 3 category, however, Rooms 102, 104, 106, and 107 were identified as containing Class 1 and 2 areas. Building 2201 was divided into “survey units” and surveyed following the requirements of the Final Status Survey Plan for each particular class. As each survey unit was completed and documented, the survey results were evaluated. Each sample (static measurement) with units of counts per minute (cpm) was corrected for the appropriate background and converted to a value with units of dpm/100 cm2. With a surface contamination value in the appropriate units, it was compared to the surface contamination limits, or in this case the derived concentration guideline level (DCGLw). The appropriate statistical test (sign test) was then performed. If the survey unit was statistically determined to be below the DCGLw, then the survey unit passed and the null hypothesis (that the survey unit is above limits) was rejected. If the survey unit was equal to or below the critical value in the sign test, the null hypothesis was not rejected. This process was performed for all survey units within Building 2201. A total of thirty-three “Class 1,” four “Class 2,” and one “Class 3” survey units were developed, surveyed, and evaluated. All survey units successfully passed the statistical test. Building 2201 meets the release criteria commensurate with the Waste Acceptance Criteria (for radiological purposes) of the U10C landfill permit residing within NNSS boundaries. Based on the thorough statistical sampling and scanning of the building’s interior, Building 2201 may be considered radiologically “clean,” or free of contamination.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-03
... EXPORT-IMPORT BANK [Public Notice 2013-0030] Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100 Million: AP087980XX AGENCY: Export-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-08
... EXPORT-IMPORT BANK [Public Notice 2013-0050] Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100 Million: AP086418XX AGENCY: Export-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-15
... EXPORT-IMPORT BANK [Public Notice 2013-0022] Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100 million: AP086115XX AGENCY: Export-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-04
... EXPORT-IMPORT BANK [Public Notice: 2013-0041] Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100 Million: AP086031XX AGENCY: Export-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-11
... EXPORT-IMPORT BANK [Public Notice: 2013-0057] Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100 Million: AP088400XX AGENCY: Export-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-21
... EXPORT-IMPORT BANK [Public Notice: 2013-0054] Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100 Million: AP086750XX AGENCY: Export-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-09
... EXPORT-IMPORT BANK [Public Notice 2013-0029] Application for Final Commitment for a Long-Term Loan or Financial Guarantee in Excess of $100 Million: AP087013XX AGENCY: Export-Import Bank of the United States. ACTION: Notice. SUMMARY: This Notice is to inform the public, in accordance with Section 3(c)(10...
75 FR 48273 - Technical Service Provider Assistance
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-10
... DEPARTMENT OF AGRICULTURE Natural Resources Conservation Service 7 CFR Part 652 RIN 0578-AA48 Technical Service Provider Assistance AGENCY: Natural Resources Conservation Service, United States Department of Agriculture. ACTION: Final rule; Correcting amendment. SUMMARY: The Natural Resources...
44 CFR 11.19 - Action on approved claim.
Code of Federal Regulations, 2010 CFR
2010-10-01
... States and against any employee of the Government whose act or omission gave rise to the claim, by reason... made under section 2672 or 2677 of title 28, United States Code, is final and conclusive on the...
44 CFR 11.19 - Action on approved claim.
Code of Federal Regulations, 2011 CFR
2011-10-01
... States and against any employee of the Government whose act or omission gave rise to the claim, by reason... made under section 2672 or 2677 of title 28, United States Code, is final and conclusive on the...
76 FR 42137 - Certain Lightweight Thermal Paper From Germany; Remand Proceedings
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-18
... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-1127 (Final) (Remand)] Certain Lightweight Thermal Paper From Germany; Remand Proceedings AGENCY: United States International Trade Commission. ACTION: Notice. SUMMARY: The U.S. International Trade Commission (``Commission'') hereby gives...
Risk Assessment Approach for the Hanford Site River Corridor Closure Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Thomson, J.E.; Weiss, S.G.; Sands, J.P.
2007-07-01
The river corridor portion of the U.S. Department of Energy's (DOE) Hanford Site includes the 100 Area and 300 Area, which border the Columbia River and cover 565 km{sup 2} (218 mi{sup 2}). The River Corridor Closure (RCC) Project scope of work includes 486 contaminated facilities, 4 of 9 deactivated plutonium production reactors, and 370 waste disposal sites. DOE's cleanup actions in the river corridor were initiated in 1994 under the Comprehensive Environmental Response, Compensation, and Liability Act of 1981 (42 U.S.C. 9601, et seq.) (CERCLA) and included source and groundwater operable units (OUs). DOE's RCC Project, awarded to Washingtonmore » Closure Hanford (WCH) in 2005, focuses on source OUs and has allowed cleanup actions to continue in the 100 and 300 Areas with completion by 2013. The regulatory authorization for cleanup actions at source OUs in the river corridor consists primarily of interim action records of decision (RODs), which were supported by qualitative risk assessments and limited field investigations. A key to establishing final cleanup decisions and proceeding toward final CERCLA closeout is completion of quantitative baseline risk assessment activities. Baseline risk assessment is necessary to determine whether cleanup actions are protective of human health and the environment and to identify any course corrections needed to ensure that current and future cleanup actions are protective. Because cleanup actions are ongoing under interim action RODs, it is desirable to establish the final cleanup decision bases as early as possible to minimize the impacts of any identified course corrections to the cleanup approach. Risk assessment is being performed by WCH as the River Corridor Baseline Risk Assessment (RCBRA). The RCBRA uses a multi-step process that summarizes existing data; uses the data quality objectives process to identify both data gaps and unresolved issues through public workshops; and solicits input from regulators, trustees, and stakeholders. Sampling and analysis plans are then developed to document quality requirements and identify field sample collection approaches. After required data are collected, the risks to human health and the environment are assessed. Sampling of upland, riparian, and near-shore environments for the 100/300 Area Component was performed in 2005 and 2006. The 100/300 Area Component includes former operational/reactor areas. The results of these efforts will be incorporated into a mid-2007 draft risk assessment report for the 100/300 Area Component of the RCBRA. Adapting methodology developed from the 100/300 Area Component, the Inter-Areas risk assessment will be conducted for the riparian and near-shore environments. The Inter-Areas Component includes shoreline areas between former operational areas addressed in the 100/300 Area Component. The Inter-Areas risk assessment will supplement results from the 100/300 Area Component to provide a more complete analysis of residual risks in the river corridor. Plans for the final element of the RCBRA, the Columbia River Component, are being developed by DOE and currently is not part of the RCC Project. The Columbia River Component includes the reach of the Columbia River located adjacent to the Hanford Site and reaches downstream to an undetermined boundary. Recommendations for final cleanup decisions at source units within the river corridor, based in part on the risk assessment results, will be presented for future public review in a River Corridor Source Unit Proposed Plan. To form an integrated cleanup approach for the river corridor, the RCBRA results for the source units require integration with risk assessment results from groundwater cleanup actions managed by other contractors. WCH's risk assessment task includes development of an integration strategy for activities leading up to the final regulatory decisions for all OUs in the river corridor. (authors)« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1997-04-01
This decision document presents the final remedies for OU3, which consists of 17 sites: No further action for the following 14 NFA (no further action) sites - Ohio Road Debris Area, Oklahoma Road Debris Area, KC-135 Crash Area, Dumpster Cleaning Area Site/Building 7841, Explosive Ordnance Disposal (EOD) Area-Cylinders, Golf Course Maintenance Shed Area, Chapman Pit Debris Area, 9000 Debris Area, Solvent/Paint Dock Area, Prima Beef Debris Area, Buildings 8951 and 8960 (DRMO), Old PX Gas Station UST, F-106A Crash Area, and Demineralization Plant; Further investigation for the Outdoor Firing Range and EOD Range; and Remedial action for the Contract Storagemore » Shed Area site to address the contaminated soils/sediments.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-02-01
This report contains questions and comments regarding a risk evaluation and possible remedial action of Operable Unit 4 at the Feed Materials Production Center at Fernald, Ohio. Attention is focused on the US EPA Region V feasibility study and on the CRARE. The CRARE is a post-remediation time frame document.
Bridge deck cracking and composite action analyses : final report, March 2010.
DOT National Transportation Integrated Search
2010-03-01
According to the American Society of Civil Engineers Report Card (ASCE, 2005), United States infrastructure received a grade point average of "D"(i.e., poor rating) in 2005. Moreover, the National Bridge Inventory (Federal Highway Administration, 200...
78 FR 18481 - Project-Level Predecisional Administrative Review Process
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-27
... Administrative Review Process AGENCY: Forest Service, USDA. ACTION: Final rule. SUMMARY: The United States... process by which the public may file objections seeking predecisional administrative review for proposed... for a predecisional objection process. Section 428 further directs the Secretary to apply these...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-14
... and sealed containers. 11. State-approved treatment facilities must be used to render infectious waste... actions, and potentially high clean-up costs. 12. Autoclave sterilization is the most common treatment for... 21008
21 CFR 58.35 - Quality assurance unit.
Code of Federal Regulations, 2013 CFR
2013-04-01
... the corrective actions taken. (5) Determine that no deviations from approved protocols or standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating procedures, and...
21 CFR 58.35 - Quality assurance unit.
Code of Federal Regulations, 2010 CFR
2010-04-01
... the corrective actions taken. (5) Determine that no deviations from approved protocols or standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating procedures, and...
21 CFR 58.35 - Quality assurance unit.
Code of Federal Regulations, 2012 CFR
2012-04-01
... the corrective actions taken. (5) Determine that no deviations from approved protocols or standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating procedures, and...
21 CFR 58.35 - Quality assurance unit.
Code of Federal Regulations, 2011 CFR
2011-04-01
... the corrective actions taken. (5) Determine that no deviations from approved protocols or standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating procedures, and...
21 CFR 58.35 - Quality assurance unit.
Code of Federal Regulations, 2014 CFR
2014-04-01
... the corrective actions taken. (5) Determine that no deviations from approved protocols or standard operating procedures were made without proper authorization and documentation. (6) Review the final study report to assure that such report accurately describes the methods and standard operating procedures, and...
77 FR 47544 - Approval of Classification Societies
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
...-AB35 Approval of Classification Societies AGENCY: Coast Guard, DHS. ACTION: Final rule. SUMMARY: Federal law requires that classification societies conducting certain work in the United States be... that classification societies must meet in order to obtain approval by the Coast Guard. Through this...
78 FR 18230 - Airworthiness Directives; Eurocopter France Helicopters
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-26
... Airworthiness Directives; Eurocopter France Helicopters AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: We are adopting a new airworthiness directive (AD) for Eurocopter France... approved by the aviation authority of France and is approved for operation in the United States. Pursuant...
78 FR 65871 - Airworthiness Directives; Eurocopter France Helicopters
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-04
... Airworthiness Directives; Eurocopter France Helicopters AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: We are adopting a new airworthiness directive (AD) for Eurocopter France... aviation authority of France and are approved for operation in the United States. Pursuant to our bilateral...
77 FR 70360 - Airworthiness Directives; Eurocopter France Helicopters
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-26
... Airworthiness Directives; Eurocopter France Helicopters AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: We are adopting a new airworthiness directive (AD) for all Eurocopter France... France and are approved for operation in the United States. Pursuant to our bilateral agreement with...
78 FR 857 - Airworthiness Directives; Eurocopter France Helicopters
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-07
... Directives; Eurocopter France Helicopters AGENCY: Federal Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: We are adopting a new airworthiness directive (AD) for Eurocopter France (Eurocopter... been approved by the aviation authority of France and are approved for operation in the United States...
78 FR 30329 - Multilayered Wood Flooring from China
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-22
...)] Multilayered Wood Flooring from China AGENCY: United States International Trade Commission. ACTION: Notice of...-1179 (Final) concerning multilayered wood flooring (``MLWF'') from China. For further information... Hardwood Floors, Inc.; BR Custom Surface; Real Wood Floors, LLC; Galleher Corp.; and DPR International, LLC...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-04
... Section 7 of the Clayton Act, 15 U.S.C. 18, by substantially lessening competition in the markets for... United States and Canada in violation of Section 7 of the Clayton Act, 15 U.S.C. 18. II. The Defendants 4... States brings this action under Section 15 of the Clayton Act, 15 U.S.C. 25, to prevent and restrain...
77 FR 72702 - Small Business Size Standards: Information
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-06
... SMALL BUSINESS ADMINISTRATION 13 CFR Part 121 RIN 3245-AG26 Small Business Size Standards: Information AGENCY: U.S. Small Business Administration. ACTION: Final rule. SUMMARY: The United States Small Business Administration (SBA) is increasing the receipts based small business size standards for 15...
75 FR 8113 - Prestressed Concrete Steel Wire Strand From China
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-23
... INTERNATIONAL TRADE COMMISSION [Investigation Nos. 701-TA-464 and 731-TA-1160 (Final)] Prestressed Concrete Steel Wire Strand From China AGENCY: United States International Trade Commission. ACTION: Revised schedule for the subject investigations. DATES: Effective Date: February 16, 2010. FOR FURTHER INFORMATION...
78 FR 14669 - Privacy Act of 1974; Implementation
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-07
... DEPARTMENT OF JUSTICE 28 CFR Part 16 [CPCLO Order No. 002-2013] Privacy Act of 1974; Implementation AGENCY: Drug Enforcement Administration, United States Department of Justice. ACTION: Final rule. SUMMARY: The Department of Justice (DOJ or Department), Drug Enforcement Administration (DEA) is issuing a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-01
... State Office, Bureau of Land Management, 2800 Cottage Way, Sacramento, CA 95825, upon required payment..., California State Office, 2800 Cottage Way, Room W-1623, Sacramento, CA 95825, 916-978-4310. SUPPLEMENTARY...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The 10-acre Spickler Landfill site is an inactive municipal and industrial landfill located in Spencer, Marathon County, Wisconsin. The site consists of a mercury brine pit and two fill areas called the Old and New Fill Areas. In 1974, the state ordered the owners of the site to terminate operations and close the landfill. The ROD provides a final remedy for the first operable unit (OU1), which consists of the mercury brine pit, and the landfill. The primary contaminants of concern affecting the soil and sludge are VOCs, including benzene, PCE, toluene, and xylenes; other organics, including pesticides; metals, includingmore » arsenic, chromium, and lead; and other inorganics, including asbestos. The selected remedial action for the operable unit includes solidifying and/or stabilizing wastes in the mercury brine pit based on treatability test results, followed by installing and maintaining an impermeable and a solid waste cap over the New and Old Fill areas.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Burmeister
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 117: Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 117 comprises Corrective Action Site (CAS) 26-41-01, Pluto Disassembly Facility, located in Area 26 of the Nevada Test Site. The purpose of this CR is to provide documentation supporting the completed corrective actions and providemore » data confirming that the closure objectives for CAU 117 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 117 issued by the Nevada Division of Environmental Protection. From May 2008 through February 2009, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for Corrective Action Unit 117, Area 26 Pluto Disassembly Facility, Nevada Test Site, Nevada. The purpose of the activities as defined during the data quality objectives process were: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 117. Assessment of the data generated from closure activities indicated that the final action levels were exceeded for polychlorinated biphenyls (PCBs) reported as total Aroclor and radium-226. A corrective action was implemented to remove approximately 50 cubic yards of PCB-contaminated soil, approximately 1 cubic foot of radium-226 contaminated soil (and scabbled asphalt), and a high-efficiency particulate air filter that was determined to meet the criteria of a potential source material (PSM). Electrical and lighting components (i.e., PCB-containing ballasts and capacitors) and other materials (e.g., mercury-containing thermostats and switches, lead plugs and bricks) assumed to be PSM were also removed from Building 2201, as practical, without the need for sampling. Because the COC contamination and PSMs have been removed, clean closure of CAS 26-41-01 is recommended, and no use restrictions are required to be placed on this CAU. No further action is necessary because no other contaminants of potential concern were found above preliminary action levels. The physical end state for Building 2201 is expected to be eventual demolition to slab. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • Clean closure is the recommended corrective action for CAS 26-41-01 in CAU 117. • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office is requested from the Nevada Division of Environmental Protection for closure of CAU 117. • Corrective Action Unit 117 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less
78 FR 64533 - Silica Bricks and Shapes From China; Revised Schedule for the Subject Investigation
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-29
... INTERNATIONAL TRADE COMMISSION [Investigation No. 731-TA-1205 (Final)] Silica Bricks and Shapes From China; Revised Schedule for the Subject Investigation AGENCY: United States International Trade Commission. ACTION: Notice. DATES: Effective Date: October 23, 2013. FOR FURTHER INFORMATION CONTACT: Cynthia...
75 FR 61597 - Small Business Size Standards: Retail Trade
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-06
... SMALL BUSINESS ADMINISTRATION 13 CFR Part 121 RIN 3245-AF69 Small Business Size Standards: Retail Trade AGENCY: U.S. Small Business Administration. ACTION: Final rule. SUMMARY: The United States Small Business Administration (SBA) is modifying 47 small business size standards for industries in North...
75 FR 61591 - Small Business Size Standards; Other Services.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-06
... SMALL BUSINESS ADMINISTRATION 13 CFR Part 121 RIN 3245-AF70 Small Business Size Standards; Other Services. AGENCY: U.S. Small Business Administration. ACTION: Final rule. SUMMARY: The United States Small Business Administration (SBA) is increasing the small business size standards for 18 industries in North...
76 FR 34871 - Mobile Barcode Promotion
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-15
... POSTAL SERVICE 39 CFR Part 111 Mobile Barcode Promotion AGENCY: Postal Service TM . ACTION: Final rule. SUMMARY: The Postal Service is revising the Mailing Standards of the United States Postal Service... mailpieces with mobile barcodes must be one of the following: 1. Presorted or automation First-Class Mail...
77 FR 12724 - International Postal Service-Global Expedited Package Services (GEPS) Contracts
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-02
... POSTAL SERVICE\\TM\\ 39 CFR Part 20 International Postal Service--Global Expedited Package Services (GEPS) Contracts AGENCY: Postal Service TM . ACTION: Final rule. SUMMARY: The Postal Service will revise Mailing Standards of the United States Postal Service, International Mail Manual (IMM[supreg]) to...
NASA Astrophysics Data System (ADS)
Hamhalter, Jan; Turilova, Ekaterina
2014-10-01
It is shown that any order isomorphism between the structures of unital associative JB subalgebras of JB algebras is given naturally by a partially linear Jordan isomorphism. The same holds for nonunital subalgebras and order isomorphisms preserving the unital subalgebra. Finally, we recover usual action of time evolution group on a von Neumann factor from group of automorphisms of the structure of Abelian subalgebras.
Rep. Carnahan, Russ [D-MO-3
2009-07-08
House - 08/19/2009 Referred to the Subcommittee on Immigration, Citizenship, Refugees, Border Security, and International Law. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
1993-12-01
Generally Accepted Process While neither DoD Directives nor USAF Regulations specify exact mandatory TDY order processing methods, most USAF units...functional input. Finally, TDY order processing functional experts at Hanscom, Los Angeles and McClellan AFBs provided inputs based on their experiences...current electronic auditing capabilities. 81 DTPS Initiative. This DFAS-initiated action to standardize TDY order processing throughout DoD is currently
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick and Sloop, Christy
2011-04-01
This Corrective Action Decision Document (CADD)/Closure Report (CR) has been prepared for Corrective Action Unit (CAU) 372, Area 20 Cabriolet/Palanquin Unit Craters, located within Areas 18 and 20 at the Nevada National Security Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit 372 comprises four corrective action sites (CASs): • 18-45-02, Little Feller I Surface Crater • 18-45-03, Little Feller II Surface Crater • 20-23-01, U-20k Contamination Area • 20-45-01, U-20L Crater (Cabriolet) The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action ismore » needed for CAU 372 based on the implementation of the corrective action of closure in place with administrative controls at all CASs. Corrective action investigation (CAI) activities were performed from November 9, 2009, through December 10, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 372: Area 20 Cabriolet/Palanquin Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 372 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL was established of 25 millirem per year based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present at all four CASs. It is assumed that radionuclide levels present within the Little Feller I and Cabriolet high contamination areas and within the craters at Palanquin and Cabriolet exceed the FAL. It is also assumed that potential source material in the form of lead bricks at Little Feller I and lead-acid batteries at Palanquin and Cabriolet exceed the FAL. Therefore, corrective actions were undertaken that consist of removing potential source material, where present, and implementing a use restriction and posting warning signs at each CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 372. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 372. • Corrective Action Unit 372 should be moved from Appendix III to Appendix IV of the FFACO.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
White, M.K.
1994-06-01
The United States Department of Energy (DOE) faces the major task of cleaning up hundreds of waste sites across the nation, which will require completion of a large number of remedial investigation/feasibility studies (RI/FSs). The intent of each RI/FS is to characterize the waste problems and environmental conditions at the operable unit level, segment the remediation problem into manageable medium-specific and contaminant-specific pieces, define corresponding remediation objectives, and identify remedial response actions to satisfy those objectives. The RI/FS team can then identify combinations of remediation technologies that will meet the remediation objectives. Finally, the team must evaluate these remedial alternativesmore » in terms of effectiveness, implementability, cost, and acceptability. The Remedial Action Assessment System (RAAS) is being developed by Pacific Northwest Laboratory (PNL) to support DOE in this effort.« less
Riparian area management: themes and recommendations
David J. Welsch; James W. Hornbeck; Elon S. Verry; Andrew Dolloff; John G. Greis
2000-01-01
The end results of most of our management actions are reflected by the health of our rivers, streams, and lakes." Michael Dombeck, Chief, USDA Forest ServiceIn this final chapter [of Riparian Management in Forests of the Continental Eastern United States], we consider the overriding themes of riparian area management and list...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-21
... of Agriculture AGENCY: Environmental Protection Agency (EPA). ACTION: Notification of submission to the Secretary of Agriculture. SUMMARY: This document notifies the public that the Administrator of EPA has forwarded to the Secretary of the United States Department of Agriculture (USDA) a draft final...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-06
... Notification of Submission to the Secretary of Agriculture; Pesticides; Satisfaction of Data Requirements...). ACTION: Notification of submission to the Secretary of Agriculture. SUMMARY: This document notifies the... Administrator has forwarded to the Secretary of the United States Department of Agriculture (USDA) a draft final...
78 FR 37404 - Small Business Size Standards: Support Activities for Mining
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-20
... SMALL BUSINESS ADMINISTRATION 13 CFR Part 121 RIN 3245-AG44 Small Business Size Standards: Support Activities for Mining AGENCY: U.S. Small Business Administration. ACTION: Final rule. SUMMARY: The United States Small Business Administration (SBA) is increasing the small business size standards for three of...
ERIC Educational Resources Information Center
Martz, Carlton
2001-01-01
This theme issue of the "Bill of Rights in Action" looks at labor issues. The first article examines the unionization efforts of the Wobblies in the United States at the beginning of the 20th century. The second article explores the protests of the Luddites during Britain's Industrial Revolution. The final article looks at whether…
75 FR 59933 - Specifications and Drawings for Construction of Direct Buried Plant
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-29
... for Construction of Direct Buried Plant AGENCY: Rural Utilities Service, USDA. ACTION: Final rule..., Specifications and Drawings for Construction of Direct Buried Plant (Form 515a). The revised specifications will include new construction units for Fiber-to-the-Home, remove redundant or outdated requirements, and...
76 FR 30001 - Amendment to the International Traffic in Arms Regulations: Libya
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-24
... International Traffic in Arms Regulations: Libya AGENCY: Department of State. ACTION: Final rule. SUMMARY: The... regarding Libya to reflect the United Nations Security Council arms embargoes adopted in February and March...: (202) 261-8199; or e-mail: [email protected] . Attn: Part 126, Libya. SUPPLEMENTARY INFORMATION: On...
76 FR 9641 - Delegation of Authority to Under Secretary for Research, Education, and Economics
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-22
... Secretary for Research, Education, and Economics AGENCY: Office of the Secretary, USDA. ACTION: Final rule... Secretary for Research, Education, and Economics for requests for the United States Department of... for Research, Education, and Economics as USDA's authorized signatory for requests for all 2-year...
78 FR 11090 - Steel Import Monitoring and Analysis System
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-15
...-2549-01] RIN 0625-AA93 Steel Import Monitoring and Analysis System AGENCY: Import Administration... Commerce (the Department) publishes this action to make final a rule to extend the Steel Import Monitoring... public statistical data on steel imports entering the United States seven weeks earlier than it would...
78 FR 48136 - Sunshine Act Notice
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-07
... COMMISSION ON CIVIL RIGHTS Sunshine Act Notice AGENCY: United States Commission on Civil Rights. ACTION: Notice of Business Meeting. DATE AND TIME: Friday, August 16, 2013; 9:30 a.m. EST. PLACE: 1331... Planning Vote to Approve and Adopt the Final Draft of the ``Civil Rights Implications of Eminent Domain...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-22
... DEPARTMENT OF TRANSPORTATION Federal Motor Carrier Safety Administration [Docket No. FMCSA-2006... AGENCY: Federal Motor Carrier Safety Administration (FMCSA), DOT. ACTION: Notice of final disposition... motor vehicles (CMV) in the United States without a commercial driver's license (CDL) issued by one of...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-09-01
Corrective Action Unit 365 comprises one corrective action site (CAS), CAS 08-23-02, U-8d Contamination Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 365 based on the implementation of the corrective action of closure in place with a use restriction (UR). Corrective action investigation (CAI) activities were performed from January 18, 2011, through August 2, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 365: Baneberry Contamination Area. The purpose of the CAI was to fulfill data needs as definedmore » during the data quality objective (DQO) process. The CAU 365 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in supporting the DQO decisions. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were found to be present to the southwest of the Baneberry crater. It was also assumed that radionuclide levels present within the crater and fissure exceed the FAL. Corrective actions were undertaken that consisted of establishing a UR and posting warning signs for the crater, fissure, and the area located to the southwest of the crater where soil concentrations exceeded the FAL. These URs were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions beyond what are described in this document are necessary for CAU 365. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 365. (3) Corrective Action Unit 365 should be moved from Appendix III to Appendix IV of the FFACO.« less
Egocentric Temporal Action Proposals.
Shao Huang; Weiqiang Wang; Shengfeng He; Lau, Rynson W H
2018-02-01
We present an approach to localize generic actions in egocentric videos, called temporal action proposals (TAPs), for accelerating the action recognition step. An egocentric TAP refers to a sequence of frames that may contain a generic action performed by the wearer of a head-mounted camera, e.g., taking a knife, spreading jam, pouring milk, or cutting carrots. Inspired by object proposals, this paper aims at generating a small number of TAPs, thereby replacing the popular sliding window strategy, for localizing all action events in the input video. To this end, we first propose to temporally segment the input video into action atoms, which are the smallest units that may contain an action. We then apply a hierarchical clustering algorithm with several egocentric cues to generate TAPs. Finally, we propose two actionness networks to score the likelihood of each TAP containing an action. The top ranked candidates are returned as output TAPs. Experimental results show that the proposed TAP detection framework performs significantly better than relevant approaches for egocentric action detection.
77 FR 17333 - Bylaws of the Board of Governors
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-26
... POSTAL SERVICE 39 CFR Parts 4, 6, and 7 Bylaws of the Board of Governors AGENCY: Postal Service. ACTION: Final rule. SUMMARY: On March 24, 2010, the Board of Governors of the United States Postal... the Code of Federal Regulations are effective March 26, 2012. FOR FURTHER INFORMATION CONTACT: Julie S...
77 FR 64242 - Airworthiness Directives; The Boeing Company Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-19
... plc, P.O. Box 31, Derby, DE24 8BJ, United Kingdom; telephone 011 44 1332 242424; fax 011 44 1332... . For Bombardier service information identified in this proposed AD, contact Short Brothers PLC... investigation into the nature, cause, and extent of the cracking. If final action is later identified, based on...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-05
... DEPARTMENT OF AGRICULTURE Forest Service 36 CFR Parts 212, 214, 215, 222, 228, 241, 251, 254, and... System Lands and Resources AGENCY: USDA, Forest Service. ACTION: Final rule. SUMMARY: The United States... individuals and entities may obtain administrative review of certain types of Forest Service (Agency...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-11
... States complains and alleges as follows: I. Nature of the Action 1. This lawsuit challenges a series of...--until the Department's investigation interrupted those efforts. 5. Because the May 2004 transactions... newsroom staffs, that their editorial policies be ``independently determined,'' and that at the time the...
21 CFR 131.147 - Dry whole milk.
Code of Federal Regulations, 2010 CFR
2010-04-01
... less than 2,000 International Units thereof. (2) Addition of vitamin D is optional. If added, vitamin D... optional ingredients may be used: (1) Carriers for vitamins A and D. (2) Emulsifiers. (3) Stabilizers. (4...-16.200. (2) Moisture content—“Moisture—Official Final Action,” section 16.192. (3) Vitamin D content...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
... the status quo. The action is expected to maximize the profitability for the spiny dogfish fishery... possible commercial quotas by not making a deduction from the ACL accounting for management uncertainty...) in 2015; however, not accounting for management uncertainty would have increased the risk of...
75 FR 16010 - Safety Zone; Red River, MN
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-31
...-AAOO Safety Zone; Red River, MN AGENCY: Coast Guard, DHS. ACTION: Temporary final rule. SUMMARY: The Coast Guard Captain of the Port (COTP), Marine Safety Unit Duluth, MN is establishing a temporary safety zone on the waters of the Red River, MN. This safety zone is being established to ensure the safety of...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-02-01
This decision document represents the selected remedial action for the Murray Ohio Dump Site. This final remedy addresses remediation of ground-water/seep contamination and soil contamination by eliminating or reducing the risks posed by the Site, through treatment, engineering and institutional controls.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-25
... Indonesia AGENCY: United States International Trade Commission. ACTION: Scheduling of the final phase of...-fair-value imports from China and Indonesia of certain coated paper, provided for in subheadings 4810...) are being provided to manufacturers, producers, or exporters in China and Indonesia of certain coated...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-06
... INTERNATIONAL TRADE COMMISSION [Investigation Nos. 701-TA-470-471 and 731-TA-1169-1170 (Final)] Certain Coated Paper Suitable for High-Quality Print Graphics Using Sheet-Fed Presses From China and Indonesia AGENCY: United States International Trade Commission. ACTION: Revised schedule for the subject...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-08
... INTERNATIONAL TRADE COMMISSION [Investigation Nos. 701-TA-470-471 and 731-TA-1169-1170 (Final)] Certain Coated Paper Suitable for High-Quality Print Graphics Using Sheet-Fed Presses From China and Indonesia AGENCY: United States International Trade Commission. ACTION: Revised schedule for the subject...
31 CFR 345.6 - General provisions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... INDEBTEDNESS-R.E.A. SERIES § 345.6 General provisions. (a) Regulations. Five Percent Treasury Certificates of Indebtedness—R.E.A. Series shall be subject to the general regulations with respect to United States securities..., and his action in any such respect shall be final. The Secretary of the Treasury may also at any time...
31 CFR 345.6 - General provisions.
Code of Federal Regulations, 2011 CFR
2011-07-01
... INDEBTEDNESS-R.E.A. SERIES § 345.6 General provisions. (a) Regulations. Five Percent Treasury Certificates of Indebtedness—R.E.A. Series shall be subject to the general regulations with respect to United States securities..., and his action in any such respect shall be final. The Secretary of the Treasury may also at any time...
31 CFR 345.6 - General provisions.
Code of Federal Regulations, 2010 CFR
2010-07-01
... INDEBTEDNESS-R.E.A. SERIES § 345.6 General provisions. (a) Regulations. Five Percent Treasury Certificates of Indebtedness—R.E.A. Series shall be subject to the general regulations with respect to United States securities..., and his action in any such respect shall be final. The Secretary of the Treasury may also at any time...
76 FR 8607 - Airworthiness Directives; The Cessna Aircraft Company Model 750 Airplanes
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-15
... Administration (FAA), DOT. ACTION: Final rule. SUMMARY: We are adopting a new airworthiness directive (AD) for... auxiliary power unit (APU) generator and the left and right engine direct current (DC) generators, and... Building Ground Floor, Room W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590. FOR FURTHER...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the March 2000, Corrective Action Decision Document / Closure Report for Corrective Action Unit 406: Area 3 Building 03-74 & 03-58 Underground Discharge Points and Corrective Action Unit 429: Area 3 Building 03-55 & Area 9 Building 09-52 Underground Discharge Points (TTR) as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. Themore » approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-51-001-0355 – Photo Shop UDP, Drains in CAU 429. It should be noted that there are no changes to CAU 406. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
Sexual Harassment in the United States Military: The Development of the DoD Survey
1988-09-30
confirmed equal opportunity complaints in the first half of fiscal year 1988 and in all of fiscal year 1987 (USAF Social 7 Actions Program Statistical Summary...State University Normal, Illinois for The Defense Equal Opportunity Management Institute Patrick Air Force Base, Florida United States Navy-ASEE 1988...Month, Day) 5. PAGE COUNT Final FROM 16ay TO _2_3J 880930 20 16. SUPPLEMENTARY NOTATION Prepared as a part of the Defense Equal Opportunity Management
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pat Matthews
This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 117, Pluto Disassembly Facility, identified in the Federal Facility Agreement and Consent Order. Corrective Action Unit 117 consists of one Corrective Action Site (CAS), CAS 26-41-01, located in Area 26 of the Nevada Test Site. This plan provides the methodology for field activities needed to gather the necessary information for closing CAS 26-41-01. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closuremore » of CAU 117 using the SAFER process. Additional information will be obtained by conducting a field investigation before finalizing the appropriate corrective action for this CAS. The results of the field investigation will support a defensible recommendation that no further corrective action is necessary following SAFER activities. This will be presented in a Closure Report that will be prepared and submitted to the Nevada Division of Environmental Protection (NDEP) for review and approval. The site will be investigated to meet the data quality objectives (DQOs) developed on June 27, 2007, by representatives of NDEP; U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for CAS 26-41-01 in CAU 117.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
Corrective Action Unit 374 comprises five corrective action sites (CASs): • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 374 based on the implementation of corrective actions. The corrective action of closure in place with administrative controls was implemented at CASs 18-23-01 and 20-45-03, and a corrective action of removing potential source material (PSM) was conducted at CAS 20-45-03. The othermore » CASs require no further action; however, best management practices of removing PSM and drums at CAS 18-22-06, and removing drums at CAS 18-22-08 were performed. Corrective action investigation (CAI) activities were performed from May 4 through October 6, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 374: Area 20 Schooner Unit Crater, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigating the primary release of radionuclides and investigating other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 374 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were found to be present in the surface soil that was sampled. It is assumed that radionuclide levels present in subsurface media within the craters and ejecta fields (default contamination boundaries) at the Danny Boy and Schooner sites exceed the FAL. It is also assumed that PSM in the form of lead-acid batteries at Schooner exceeds the FAL. Therefore, corrective actions were undertaken that consist of removing PSM, where present, and implementing a use restriction and posting warning signs at the Danny Boy and Schooner sites. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 374. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 374. • Corrective Action Unit 374 should be moved from Appendix III to Appendix IV of the FFACO.« less
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 15 2010-07-01 2010-07-01 false Final action. 66.81 Section 66.81... COLLECTION OF NONCOMPLIANCE PENALTIES BY EPA Final Action § 66.81 Final action. (a) A final Agency action... State action pursuant to part 67. (b) The actions listed in paragraph (a) of this section constitute...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Management; The Delphi Groupe, Inc.; J. A. Cesare and Associates, Inc.
The report is the Final Construction Quality Assurance (CQA) Report for the 92-Acrew Evapotranspiration Cover, Area 5 Waste Management Division Retired Mixed Waste Pits, Nevada National Security Site, Nevada, for the period of January 20, 2011, to January 31, 2012 The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03more » and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location, waste types and regulatory requirements: (1) Pit 3 Mixed Waste Disposal Unit (MWDU); (2) Corrective Action Unit (CAU) 111; (3) CAU 207; (4) Low-level waste disposal units; (5) Asbestiform low-level waste disposal units; and (6) One transuranic (TRU) waste trench.« less
1979-05-15
United - -r’TA a~ y, Colorado Submitted in partial satisfaction of the requirements for the degree of MASTER OF ARTS in SPEECH COMMUNICATION V.r at...were developed, one by Fiedler and the other by Vroom , and finally the action research model proposed by French and Bell. All three have a different... Performance ," Org.anizational Behavior and Human Performance 3(1968): 143. 9 David A. Nadler, Philip H. Mirvis, and Cortland T. Cammann, "The Ongoing Feedback
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 371, Johnnie Boy Crater and Pin Stripe, located within Areas 11 and 18 at the Nevada Test Site, Nevada, in accordance with the Federal Facility Agreement and Consent Order (FFACO). Corrective Action Unit (CAU) 371 comprises two corrective action sites (CASs): • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 371 based on the implementation of correctivemore » actions. The corrective action of closure in place with administrative controls was implemented at both CASs. Corrective action investigation (CAI) activities were performed from January 8, 2009, through February 16, 2010, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 371: Johnnie Boy Crater and Pin Stripe. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 371 dataset of investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. Radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface soil. However, it was assumed that radionuclides are present in subsurface media within the Johnnie Boy crater and the fissure at Pin Stripe. Due to the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consist of implementing a use restriction and posting warning signs at each site. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: • No further corrective actions are necessary for CAU 371. • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 371. • Corrective Action Unit 371 should be moved from Appendix III to Appendix IV of the FFACO.« less
77 FR 6171 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-07
..., and Caltrans assumed, environmental responsibilities for this project pursuant to 23 U.S.C. 326..., Environmental MPS and Local Assistance Branch (Unit 2576), California Department of Transportation, District 10... Environmental Policy Act of 1969, as amended [42 U.S.C. 4321 et seq.]; Section 4(f) of the Department of...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-06
... DEPARTMENT OF DEFENSE Department of the Air Force Record of Decision for the Air Space Training Initiative Shaw Air Force Base, South Carolina Final Environmental Impact Statement ACTION: Notice of Availability (NOA) of a Record of Decision (ROD). SUMMARY: On December 9, 2011, the United States Air Force...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-27
...), Commerce. ACTION: Final changes to management measures. SUMMARY: NMFS establishes funding responsibilities... the Fishery Management Plan for the Shrimp Fishery of the Gulf of Mexico (FMP), as prepared by the Gulf of Mexico (Gulf) Fishery Management Council (Council). Newer and more efficient ELB units have...
Sen. Levin, Carl [D-MI
2013-06-19
Senate - 06/19/2013 Submitted in the Senate, considered, and agreed to without amendment and with a preamble by Unanimous Consent. (All Actions) Tracker: This bill has the status Agreed to in SenateHere are the steps for Status of Legislation:
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-13
... action corrects a mistake in the amendatory language in the final rule for Amendment 11 to the Atlantic... 648.4; the new regulatory text will be effective on March 1, 2012. The amendatory language for Sec...)(iii). However, the amendatory language should have also included instructions for a revision of Sec...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-18
... Council (Council), was to set specifications for the scallop fishery, including days-at-sea (DAS.... Correction This action revises the table at Sec. 648.53(b)(4) to correctly reference the FY 2014 DAS... the FY 2014 DAS allocations outlined in Joint Framework 24/49, the table in the final rule...
76 FR 30023 - Pamlico Sound and Adjacent Waters, NC; Danger Zones for Marine Corps Operations
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-24
... DEPARTMENT OF DEFENSE Corps of Engineers, Department of the Army 33 CFR Part 334 Pamlico Sound and Adjacent Waters, NC; Danger Zones for Marine Corps Operations AGENCY: United States Army Corps of Engineers, DoD. ACTION: Final rule. SUMMARY: The U.S. Army Corps of Engineers is amending its regulations to...
77 FR 10960 - Security Zone, East River and Bronx Kill; Randalls and Wards Islands, NY
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-24
...-AA87 Security Zone, East River and Bronx Kill; Randalls and Wards Islands, NY AGENCY: Coast Guard, DHS. ACTION: Temporary final rule. SUMMARY: The Coast Guard is establishing a temporary security zone on the... security zone is necessary to ensure the safety of the President of the United States, members of his...
78 FR 40391 - Special Local Regulations; Dinghy Poker Run, Middle River; Baltimore County, Essex, MD
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-05
... the rule is to ensure safety of life on navigable waters of the United States during the Dinghy Poker...: Coast Guard, DHS. ACTION: Temporary final rule. SUMMARY: The Coast Guard proposes to establish special... River. These special local regulations are necessary to provide for the safety of life on navigable...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-29
....S.C. Sec. 18. 6. The Court has subject matter jurisdiction over this action and the defendants... ``dark'' equities trading services, including the continuous pre- trade publication of the best-priced... undisplayed equity trading services, like dark pools, which offer no pre-trade transparency and cater mainly...
40 CFR 60.590 - Applicability and designation of affected facility.
Code of Federal Regulations, 2010 CFR
2010-07-01
... or replacement of equipment (defined in § 60.591) for the purpose of process improvement which is... in § 60.591) within a process unit is an affected facility. (b) Any affected facility under paragraph... “process unit” in § 60.590 of this subpart until the EPA takes final action to require compliance and...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-08-01
Corrective Action Unit 375 comprises three corrective action sites (CASs): (1) 25-23-22, Contaminated Soils Site; (2) 25-34-06, Test Cell A Bunker; and (3) 30-45-01, U-30a, b, c, d, e Craters. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 375 based on the implementation of corrective action of closure in place with administrative controls at CAS 25-23-22, no further action at CAS 25-34-06, and closure in place with administrative controls and removal of potential source material (PSM) at CAS 30-45-01. Corrective action investigation (CAI) activities weremore » performed from July 28, 2010, through April 4, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 375: Area 30 Buggy Unit Craters. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (migration in washes and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 375 dataset of investigation results was evaluated based on the data quality assessment. This assessment demonstrated the dataset is acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Remote Work Area exposure scenario (336 hours of annual exposure). Radiological doses exceeding the FAL were assumed to be present within the default contamination boundaries at CASs 25-23-22 and 30-45-01. No contaminants were identified at CAS 25-34-06, and no corrective action is necessary. Potential source material in the form of lead plate, lead-acid batteries, and oil within an abandoned transformer were identified at CAS 30-45-01, and corrective actions were undertaken that consisted of removing the PSM. Use restrictions and warning signs were implemented for the remaining radiological contamination at CASs 25-23-22 and 30-45-01. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. Therefore, NNSA/NSO provides the following recommendations: (1) No further corrective actions are necessary for CAU 375; (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 375; and (3) Move CAU 375 from Appendix III to Appendix IV of the FFACO.« less
ERIC Educational Resources Information Center
Wurmbrand, Mitchell M.; Klotz, Thomas C.
2010-01-01
On September 22, 2009, The United States Environmental Protection Agency (EPA) issued its final rule on greenhouse gas (GHG) emission reporting. The informational literature that EPA has published to support the rule clearly states that EPA believes the vast majority of smaller GHG-emitting facilities, such as educational facilities, will not be…
38 CFR 1.10 - Eligibility for and disposition of the United States flag for burial purposes.
Code of Federal Regulations, 2011 CFR
2011-07-01
... request to a close friend or associate of the deceased veteran. Such action will constitute final and... phrase close friend or associate for the purpose of disposing of the burial flag means any person who... establishes by evidence that he or she was a close friend or associate of the veteran may be furnished the...
Rep. Nadler, Jerrold [D-NY-8
2009-01-06
House - 09/14/2009 Referred to the Subcommittee on the Constitution, Civil Rights, and Civil Liberties. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
Code of Federal Regulations, 2013 CFR
2013-07-01
... provider by overnight courier, for delivery the next business day. (f) Except as provided in paragraph (h...) Except as provided in paragraph (h) of this section, the decision to deny a provider's application or to remove a provider from the approved list shall take effect upon: (1) The expiration of the provider's...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1996-02-05
This decision document presents the selected removal action for the Installation Restoration Program (IRP) site ST005, otherwise known as the POL Tank Farm, at Galena Airport, Alaska. This decision is based on the administrative record for this site, specifically the draft Remedial Investigation Report (March 1995) and the Treatability Study Report (January 1995) (PB95-225314). The information from these documents is summarized, along with an analysis of potential removal action alternatives in the Engineering Evaluation/Cost Analysis (EE/CA).
Code of Federal Regulations, 2010 CFR
2010-04-01
... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false Final action. 636.11 Section 636.11 Employees... HEARINGS § 636.11 Final action. The final decision of the Secretary pursuant to section 166(b) of the Act... Officer's final determination where there has been no such hearing, constitutes final agency action within...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false Final action. 636.11 Section 636.11 Employees... HEARINGS § 636.11 Final action. The final decision of the Secretary pursuant to section 166(b) of the Act... Officer's final determination where there has been no such hearing, constitutes final agency action within...
2009-07-09
The Food and Drug Administration (FDA) is issuing a final rule that requires shell egg producers to implement measures to prevent Salmonella Enteritidis (SE) from contaminating eggs on the farm and from further growth during storage and transportation, and requires these producers to maintain records concerning their compliance with the rule and to register with FDA. FDA is taking this action because SE is among the leading bacterial causes of foodborne illness in the United States, and shell eggs are a primary source of human SE infections. The final rule will reduce SE-associated illnesses and deaths by reducing the risk that shell eggs are contaminated with SE.
Evaluating the US Counter-ISIL Strategy
2017-05-25
Evaluating the US Counter-ISIL Strategy A Monograph by LTC Jason A. Curl U.S. Army School of Advanced Military Studies United States Army...SPONSORING / MONITORING AGENCY NAME(S) AND ADDRESS(ES) Advanced Straegic Leadership Studies Program 10. SPONSOR/MONITOR’S ACRONYM(S) 11. SPONSOR... studies and they use media very effectively to show the religious legitimacy of their actions. Finally, efforts to prevent the flow of ISIL supporters
2018-01-23
The United States Office of Personnel Management (OPM) is issuing a final rule amending Federal Employees Health Benefits (FEHB) Program regulations to provide a process for removal of certain identified individuals who are found not to be eligible as family members from FEHB enrollments. This process would apply to individuals for whom there is a failure to provide adequate documentation of eligibility when requested. This action also amends Federal Employees Health Benefits (FEHB) Program regulations to allow certain eligible family members to be removed from existing self and family or self plus one enrollments.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This Closure Report provides documentation of the activities conducted during the Resource Conservation and Recovery Act (RCRA) closure of the Bitcutter and Postshot Containment Shops Injection Wells located in Area 2 of the Nevada Test Site (NTS), Oak Spring Quadrangle (USGS, 1986), Township 10 South, Range 53 East, Nye County, Nevada. This report discusses the Bitcutter Shop Inside Injection Well (CAU 90-A) closure-in-place and the Bitcutter Shop Outside Injection Well (CAU 90-B) and Postshot Containment Shop Injection Well (CAU 90-C) clean closures. This Closure Report provides background information about the unit, the results of the characterization activities and actions conductedmore » to determine the closure design. It also provides a discussion of the drainage analysis, preliminary closure activities, final closure activities, waste management activities, and the Post-Closure Care requirements.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews and Dawn Peterson
2011-09-01
Corrective Action Unit 106 comprises four corrective action sites (CASs): (1) 05-20-02, Evaporation Pond; (2) 05-23-05, Atmospheric Test Site - Able; (3) 05-45-04, 306 GZ Rad Contaminated Area; (4) 05-45-05, 307 GZ Rad Contaminated Area. The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 106 based on the implementation of corrective actions. The corrective action of clean closure was implemented at CASs 05-45-04 and 05-45-05, while no corrective action was necessary at CASs 05-20-02 and 05-23-05. Corrective action investigation (CAI) activities were performed from October 20,more » 2010, through June 1, 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 106: Areas 5, 11 Frenchman Flat Atmospheric Sites. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of other releases (mechanical displacement and chemical releases). The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 106 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Investigation results were evaluated against final action levels (FALs) established in this document. A radiological dose FAL of 25 millirem per year was established based on the Industrial Area exposure scenario (2,250 hours of annual exposure). The only radiological dose exceeding the FAL was at CAS 05-45-05 and was associated with potential source material (PSM). It is also assumed that additional PSM in the form of depleted uranium (DU) and DU-contaminated debris at CASs 05-45-04 and 05-45-05 exceed the FAL. Therefore, corrective actions were undertaken at these CASs that consisted of removing PSM and collecting verification samples. Results of verification samples show that remaining soil does not contain contamination exceeding the FALs. Therefore, the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) provides the following recommendations: (1) No further corrective actions are necessary for CAU 106. (2) A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 106. (3) Corrective Action Unit 106 should be moved from Appendix III to Appendix IV of the FFACO.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
... 27 Alcohol, Tobacco Products and Firearms 2 2010-04-01 2010-04-01 false Final action. 72.39... Remission or Mitigation of Forfeitures § 72.39 Final action. (a) Petitions for remission or mitigation of forfeiture. (1) The Director shall take final action on any petition filed pursuant to these regulations...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 27 Alcohol, Tobacco Products and Firearms 2 2011-04-01 2011-04-01 false Final action. 72.39... Remission or Mitigation of Forfeitures § 72.39 Final action. (a) Petitions for remission or mitigation of forfeiture. (1) The Director shall take final action on any petition filed pursuant to these regulations...
Israel: Background and U.S. Relations in Brief
2017-01-06
future Israeli-Palestinian negotiations by Secretary of State John Kerry on December 28, 2016, and other statements and actions related to issues of...Interim Agreement; permanent status to be determined through further negotiation . The status of the Gaza Strip is a final status issue to be resolved...through negotiations . Israel proclaimed Jerusalem as its capital in 1950, but the United States, like nearly all other countries, retains its embassy in
Water system microbial check valve development
NASA Technical Reports Server (NTRS)
Colombo, G. V.; Greenley, D. R.; Putnam, D. F.
1978-01-01
A residual iodine microbial check valve (RIMCV) assembly was developed and tested. The assembly is designed to be used in the space shuttle potable water system. The RIMCV is based on an anion exchange resin that is supersaturated with an iodine solution. This system causes a residual to be present in the effluent water which provides continuing bactericidal action. A flight prototype design was finalized and five units were manufactured and delivered.
Final Memorandum on Remedial-Action Objectives for Operable Units 4-10. Tooele Army Depot-North Area
1992-12-01
HAZARDOUS MATERIALS AGENCY (USATHAMA) ABERDEEN PROVING GROUND, MARYLAND Prepared by SEC Donohue, Inc. (Formerly Chem- Nuclear Environmental Services, Inc...Inc. (formerly Chem- Nuclear Environmental Services, Inc.), as deliverables under a Federal Facilities Agreement (FFA) between TEAD, the State of Utah...of Building 659. The building has a concrete floor and bermed containment and is a Nuclear Regulatory Commission (NRC)-licensed facility for the
47 CFR 1.103 - Effective dates of Commission actions; finality of Commission actions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 1 2011-10-01 2011-10-01 false Effective dates of Commission actions; finality of Commission actions. 1.103 Section 1.103 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... Actions Taken by the Commission and Pursuant to Delegated Authority; Effective Dates and Finality Dates of...
47 CFR 1.103 - Effective dates of Commission actions; finality of Commission actions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 1 2010-10-01 2010-10-01 false Effective dates of Commission actions; finality of Commission actions. 1.103 Section 1.103 Telecommunication FEDERAL COMMUNICATIONS COMMISSION... Actions Taken by the Commission and Pursuant to Delegated Authority; Effective Dates and Finality Dates of...
NASA Technical Reports Server (NTRS)
Steele, John W.; Rector, Tony; Gazda, Daniel; Lewis, John
2011-01-01
An EMU water processing kit (Airlock Coolant Loop Recovery -- A/L CLR) was developed as a corrective action to Extravehicular Mobility Unit (EMU) coolant flow disruptions experienced on the International Space Station (ISS) in May of 2004 and thereafter. A conservative duty cycle and set of use parameters for A/L CLR use and component life were initially developed and implemented based on prior analysis results and analytical modeling. Several initiatives were undertaken to optimize the duty cycle and use parameters of the hardware. Examination of post-flight samples and EMU Coolant Loop hardware provided invaluable information on the performance of the A/L CLR and has allowed for an optimization of the process. The intent of this paper is to detail the evolution of the A/L CLR hardware, efforts to optimize the duty cycle and use parameters, and the final recommendations for implementation in the post-Shuttle retirement era.
The effects of poliomyelitis on motor unit behavior during repetitive muscle actions: a case report.
Trevino, Michael A; Herda, Trent J; Cooper, Michael A
2014-09-06
Acute paralytic poliomyelitis is caused by the poliovirus and usually results in muscle atrophy and weakness occurring in the lower limbs. Indwelling electromyography has been used frequently to investigate the denervation and innervation characteristics of the affected muscle. Recently developed technology allows the decomposition of the raw surface electromyography signals into the firing instances of single motor units. There is limited information regarding this electromyographic decomposition in clinical populations. In addition, regardless of electromyographic methods, no study has examined muscle activation parameters during repetitive muscle actions in polio patients. Therefore, the purpose of this study was to examine the motor unit firing rates and electromyographic amplitude and center frequency of the vastus lateralis during 20 repetitive isometric muscle actions at 50% maximal voluntary contraction in healthy subjects and one patient that acquired acute paralytic poliomyelitis. One participant that acquired acute type III spinal poliomyelitis (Caucasian male, age = 29 yrs) at 3 months of age and three healthy participants (Caucasian females, age = 19.7 ± 2.1 yrs) participated in this study. The polio participant reported neuromuscular deficiencies as a result of disease in the hips, knees, buttocks, thighs, and lower legs. None of the healthy participants reported any current or ongoing neuromuscular diseases or musculoskeletal injuries. An acute bout of poliomyelitis altered motor unit behavior, such as, healthy participants displayed greater firing rates than the polio patient. The reduction in motor unit firing rates was likely a fatigue protecting mechanism since denervation via poliomyelitis results in a reduction of motorneurons. In addition, the concurrent changes in motor unit firing rates, electromyography amplitude and frequency for the polio participant would suggest that the entire motorneuron pool was utilized in each contraction unlike for the healthy participants. Finally, healthy participants exhibited changes in all electromyographic parameters during the repetitive muscle actions despite successfully completing all contractions with only a slight reduction in force. Thus, caution is warranted when quantifying muscular fatigue via motor unit firing rates and other electromyographic parameters since the parameters changed despite successful completing of all contractions with only a moderate reduction in strength in healthy subjects.
Pacquette, Lawrence H; Thompson, Joseph J; Malaviole, I; Zywicki, R; Woltjes, F; Ding, Y; Mittal, A; Ikeuchi, Y; Sadipiralla, B; Kimura, S; Veltman, H; Miura, A
2018-03-01
AOAC Final Action Official MethodSM 2015.06 "Minerals and Trace Elements in Milk, Milk Products, Infant Formula and Adult/Pediatric Nutritional Formula, ICP-MS Method" was collaboratively studied. Note that "milk, milk products" has now been added to the title of the Final Action method because whole milk and several dairy ingredients were successfully incorporated into the collaborative study for the purpose of developing an International Organization for Standardization/International Dairy Federation standard (ISO/DIS 21424; in progress). The method determines sodium, magnesium, phosphorus, potassium, calcium, iron, manganese, zinc, copper, chromium, molybdenum, and selenium by inductively coupled plasma (ICP)-MS after microwave digestion. Ten laboratories participated in the study, and data from five different model ICP-MS units were represented. Thirteen products, five placebo products, and six dairy samples were tested as blind duplicates in this study, along with a standard reference material, for a total 50 samples. The overall repeatability and reproducibility for all samples met Standard Method Performance Requirements put forth by the AOAC Stakeholder Panel on Infant Formula and Adult Nutritionals, with a few exceptions. Comparisons are made to ICP-atomic emission data from a collaborative study of AOAC Official Method 2011.14 carried out concurrently on these same samples.
Robinson, N J; Brennan, M L; Cobb, M; Dean, R S
2017-04-01
In order for veterinary surgeons to undertake an evidence-based approach to making decisions about their patients, it is important that new evidence is generated to support the clinical decision-making process. Many of the decisions are likely to be around the actions taken to treat or manage health problems discussed during the consultation, and little is currently known about the factors which affect the type of action taken. The aim of this study was to determine the decisions made and actions taken for health problems discussed during first-opinion small-animal consultations, as well as identifying factors which may affect the decision-making process. Data were gathered during direct observation of small-animal consultations conducted by 62 veterinary surgeons in eight first-opinion practices in the United Kingdom. For each patient presented, data were gathered on all health problems discussed during the consultation. The decision made (whether an action was taken or not) and the action taken where applicable (e.g. therapeutic treatment with antibiotics) was also recorded. A three-level multivariable logistic-regression model was developed, with problem (Level 1) nested within patient (Level 2) nested within consulting veterinary surgeon (Level 3), and a binary outcome variable of action versus no action. At least one action was taken for 69% (n=2203/3192) of all problems discussed. Therapeutic treatment was the most common action taken (n=1286/3192 problems; 40.3%), followed by management advice (n=1040/3192; 32.6%) and diagnostic work-up (n=323/3192; 10.1%). The most common therapeutic treatment was antibiotics (n=386/1286; 30%), while the most common management advice given was dietary advice (n=509/1040; 48.9%). The three explanatory variables remaining in the final model were whether the problem was a presenting or non-presenting problem, the type of diagnosis made, and the body system affected. Explanatory variables which did not remain in the final model were patient signalment, problem history, consultation type, clinical examination type, and who raised the problem (veterinary surgeon or owner). For over two-thirds of problems discussed, an action was taken which suggests these problems may be seen as important by the veterinary surgeon and/or pet owner. No action was taken for almost a third of cases which could represent 'watchful waiting', which has been highlighted as important in human healthcare. Future research should focus on the common actions taken, further exploring the complex decision-making process, and examining the effect of the decisions made on long-term patient outcomes. Copyright © 2017 The Authors. Published by Elsevier B.V. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-06-01
Corrective Action Unit 367 comprises four corrective action sites (CASs): • 10-09-03, Mud Pit • 10-45-01, U-10h Crater (Sedan) • 10-45-02, Ess Crater Site • 10-45-03, Uncle Crater Site The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation of the corrective actions and site closure activities implemented at CAU 367. A corrective action of closure in place with use restrictions was completed at each of the three crater CASs (10-45-01, 10-45-02, and 10-45-03); corrective actions were not required at CAS 10-09-03. In addition, a limited soil removal corrective action was conducted at the locationmore » of a potential source material release. Based on completion of these correction actions, no additional corrective action is required at CAU 367, and site closure is considered complete. Corrective action investigation (CAI) activities were performed from February 2010 through March 2011, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 367: Area 10 Sedan, Ess and Uncle Unit Craters, Nevada Test Site, Nevada. The approach for the CAI was divided into two facets: investigation of the primary release of radionuclides, and investigation of non-test or other releases (e.g., migration in washes and potential source material). Based on the proximity of the Uncle, Ess, and Sedan craters, the impact of the Sedan test on the fallout deposited from the two earlier tests, and aerial radiological surveys, the CAU 367 investigation was designed to study the releases from the three crater CASs as one combined release (primary release). Corrective Action Site 10-09-03, Mud Pit, consists of two mud pits identified at CAU 367. The mud pits are considered non-test releases or other releases and were investigated independent of the three crater CASs. The purpose of the CAI was to fulfill data needs as defined during the data quality objective (DQO) process. The CAU 367 dataset of investigation results was evaluated based on a data quality assessment. This assessment demonstrated the dataset is complete and acceptable for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. For the primary release, radiological doses exceeding the FAL of 25 millirem per year were not found to be present in the surface or shallow subsurface soil outside the default contamination boundary. However, it was assumed that radionuclides are present in subsurface media within each of the three craters (Sedan, Ess, and Uncle) due to prompt injection of radionuclides from the tests. Based on the assumption of radiological dose exceeding the FAL, corrective actions were undertaken that consisted of implementing a use restriction and posting warning signs at each crater CAS. These use restrictions were recorded in the FFACO database; the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO) Facility Information Management System; and the NNSA/NSO CAU/CAS files. With regard to other releases, no contaminants of concern were identified at the mud pits or any of the other release locations, with one exception. Potential source material in the form of lead was found at one location. A corrective action of clean closure was implemented at this location, and verification samples indicated that no further action is necessary. Therefore, NNSA/NSO provides the following recommendations: • A Notice of Completion to NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 367. • Corrective Action Unit 367 should be promoted from Appendix III to Appendix IV of the FFACO.« less
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 7 Agriculture 4 2013-01-01 2013-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 7 Agriculture 4 2014-01-01 2014-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 7 Agriculture 4 2011-01-01 2011-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
7 CFR 275.18 - Project area/management unit corrective action plan.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 7 Agriculture 4 2012-01-01 2012-01-01 false Project area/management unit corrective action plan... SYSTEM Corrective Action § 275.18 Project area/management unit corrective action plan. (a) The State agency shall ensure that corrective action plans are prepared at the project area/management unit level...
[Nurse's concept in the managerial conception of a basic health unit].
Passos, Joanir Pereira; Ciosak, Suely Itsuko
2006-12-01
This study is part of a larger survey called "Use of indicators in nurses' managerial practice in Basic Health Care Units in the city of Rio de Janeiro", which was carried out in the Basic Health Care Units of the Planning Area 5.3 and whose objectives were to identify nurses' conception regarding the tools required for management in those units and to discuss the role of management in organizing health services. The study is descriptive and data were collected in interviews with seven nurse managers. The results show that health services actions are organized and directed to the purpose of the working process through the relationship established between the object, the instruments and the final product, and that for those nurses the end result to be achieved is client's satisfaction and the quality of medical and nursing care.
Engineering Evaluation/Cost Analysis (EE/CA) for Decommissioning of TAN-607 Hot Shop Area
DOE Office of Scientific and Technical Information (OSTI.GOV)
J. P. Floerke
Test Area North (TAN) -607, the Technical Support Facility, is located at the north end of the Idaho National Laboratory (INL) Site. U.S. Department of Energy Idaho Operations Office (DOE-ID) is proposing to decommission the northern section of the TAN-607 facility, hereinafter referred to as TAN-607 Hot Shop Area, under a Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) non-time-critical removal action (NTCRA). Despite significant efforts by the United States (U.S.) Department of Energy (DOE) to secure new business, no future mission has been identified for the TAN-607 Hot Shop Area. Its disposition has been agreed to by the Idahomore » State Historical Preservation Office documented in the Memorandum of Agreement signed October 2005 and it is therefore considered a surplus facility. A key element in DOE's strategy for surplus facilities is decommissioning to the maximum extent possible to ensure risk and building footprint reduction and thereby eliminating operations and maintenance cost. In addition, the DOE's 2006 Strategic Plan is ''complete cleanup of the contaminated nuclear weapons manufacturing and testing sites across the United States. DOE is responsible for the risk reduction and cleanup of the environmental legacy of the Nation's nuclear weapons program, one of the largest, most diverse, and technically complex environmental programs in the world. The Department will successfully achieve this strategic goal by ensuring the safety of the DOE employees and U.S. citizens, acquiring the best resources to complete the complex tasks, and managing projects throughout the United States in the most efficient and effective manner.'' TAN-607 is designated as a historical Signature Property by DOE Headquarters Advisory Council on Historic Preservation and, as such, public participation is required to determine the final disposition of the facility. The decommissioning action will place the TAN-607 Hot Shop Area in a final configuration that will be protective of human health and the environment. Decommissioning the TAN-607 Hot Shop Area is consistent with the joint DOE and U.S. Environmental Protection Agency (EPA) Policy on Decommissioning of Department of Energy Facilities Under the Comprehensive Environmental Response, Compensation and Liability Act, which establishes the CERCLA NTCRA process as the preferred approach for decommissioning surplus DOE facilities. Under this policy, a NTCRA may be taken when DOE determines that the action will prevent, minimize, stabilize, or eliminate a risk to human health and/or the environment. When DOE determines that a CERCLA NTCRA is necessary, DOE is authorized to evaluate, select, and implement the removal action that DOE determines is most appropriate to address the potential risk posed by the release or threat of release. This action is taken in accordance with applicable authorities and in conjunction with EPA and the State of Idaho pursuant to Section 5.3 of the Federal Facility Agreement and Consent Order. In keeping with the joint policy, this engineering evaluation/cost analysis (EE/CA) was developed in accordance with CERCLA as amended by the ''Superfund Amendments and Reauthorization Act of 1986'' and in accordance with the ''National Oil and Hazardous Substances Pollution Contingency Plan.'' This EE/CA is consistent with the remedial action objectives (RAOs) of the Final Record of Decision, Test Area North, Operable Unit 1-10 and supports the overall remediation goals established through the Federal Facility Agreement and Consent Order for Waste Area Group 1. Waste Area Group 1 is located at TAN.« less
Recent developments in the long-term preservation of red blood cells.
Greenwalt, T J
1997-11-01
The first study to suggest the successful prolongation of the useful shelf life of red blood cells (RBCs) used a hypotonic additive solution containing glycerol. It was necessary to use twice the volume of this solution than the commercial additive solution per unit of packed RBCs. The final concentration of glycerol in the units was approximately 0.69% (75 mmol/L). A subsequent study demonstrated that the membranes of the exocytic microvesicles shed during storage had less of bands 3 and 4.1 than those in Adsol (Fenwal Laboratories, Deerfield, IL). Band 4.1 is important for strengthening the bonds between spectrin and actin in the cytoskeleton. In another study, glutamine or glutamine plus phosphate was used in a hypotonic additive solution, otherwise similar to the glycerol-containing additive. In the latter medium, phosphatidylethanolamine was less accessible to phospholipase action than in Adsol or when glutamine alone was added. Another group reported encouraging data regarding the action of L-carnitine when added to AS-3. Acylation of phosphatidylethanolamine mediated by the action of carnitine fatty acid transferase with acyl coenzyme A (acyl-CoA) occurred. Adenosine-5'-triphosphate levels and red cell recovery were better in the test units. In the last paper reviewed, the authors demonstrated that oxidant damage of erythrocytes was less if the donors were given a mixture of antioxidants for 10 days prior to donating.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2008-02-01
This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 563, Septic Systems, in accordance with the Federal Facility Agreement and Consent Order (FFACO, 1996; as amended January 2007). The corrective action sites (CASs) for CAU 563 are located in Areas 3 and 12 of the Nevada Test Site, Nevada, and are comprised of the following four sites: •03-04-02, Area 3 Subdock Septic Tank •03-59-05, Area 3 Subdock Cesspool •12-59-01, Drilling/Welding Shop Septic Tanks •12-60-01, Drilling/Welding Shop Outfalls The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a correctivemore » action alternative (CAA) for the four CASs within CAU 563. Corrective action investigation (CAI) activities were performed from July 17 through November 19, 2007, as set forth in the CAU 563 Corrective Action Investigation Plan (NNSA/NSO, 2007). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern (COCs) for each CAS. The results of the CAI identified COCs at one of the four CASs in CAU 563 and required the evaluation of CAAs. Assessment of the data generated from investigation activities conducted at CAU 563 revealed the following: •CASs 03-04-02, 03-59-05, and 12-60-01 do not contain contamination at concentrations exceeding the FALs. •CAS 12-59-01 contains arsenic and chromium contamination above FALs in surface and near-surface soils surrounding a stained location within the site. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAS 12-59-01, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 563.« less
2008-06-01
which play a predominant role in protecting and preserving the national interests of the United States of America . The Proposed Action is needed...Additionally, potential health and safety impacts that could disproportionately affect children will be considered under the guidelines established by...EO 13045, Protection of Children from Environmental Health Risks and Safety Risks. In a policy formulated to address EO 13084, Consultation and
An Enhanced Collaborative-Software Environment for Information Fusion at the Unit of Action
2007-12-07
GRAY CONVOY RED CONVOY DISMOUNT SA-18 D O DISMOUNT W/ SURVEILANCE EQUIPDISMOUNT UNKNOWN zC-LFFRLIFEFORM < SA-18 FIXED WING CLASSIFIED INFORMATION...Ground Truth Semantic-aggregation hierarchy (evaluation-use only) BSGs GTGs BSOS GTOS Reports Figure 4: Semantic-Aggregation Hierarchy PIR/SIR CIFAR...Finally, GTOs can be aggregated into GTGs (ground-truth groups) using the provided ground-truth force structure hierarchy for GTOs. GTGs can only be
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for Corrective Action Unit 326: Areas 6 and 27 Release Sites, Nevada Test Site, Nevada (Revision 1), December 2002 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • Themore » cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 06-25-01, CP-1 Heating Oil Release. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for Corrective Action Unit 403: Second Gas Station, Tonopah Test Range, Nevada, September 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title, and signature pagesmore » of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-004-0360, Underground Storage Tanks. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits, Nevada Test Site, Nevada, January 2004 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additional information • The cover, title,more » and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the UR for CAS 19-09-05, Mud Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was reevaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the August 2001, Corrective Action Decision Document / Closure Report for Corrective Action Unit 321: Area 22 Weather Station Fuel Storage as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 22-99-05, Fuel Storage Area. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
76 FR 9853 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-22
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice... final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed highway project...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 24 Housing and Urban Development 1 2010-04-01 2010-04-01 false Final action. 7.37 Section 7.37..., Color Religion, Sex, National Origin, Age, Disability or Reprisal Complaints § 7.37 Final action. (a... include the remedial and corrective action necessary to ensure that the Department is in compliance with...
Code of Federal Regulations, 2011 CFR
2011-04-01
... 24 Housing and Urban Development 1 2011-04-01 2011-04-01 false Final action. 7.37 Section 7.37..., Color Religion, Sex, National Origin, Age, Disability or Reprisal Complaints § 7.37 Final action. (a... include the remedial and corrective action necessary to ensure that the Department is in compliance with...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 37 Patents, Trademarks, and Copyrights 1 2010-07-01 2010-07-01 false Final action. 2.64 Section 2... COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Examination of Application and Action by Applicants § 2.64 Final action. (a) On the first or any subsequent reexamination or reconsideration the refusal of the...
75 FR 36551 - State Highway-Rail Grade Crossing Action Plans
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-28
...-0032; Notice No. 5] RIN 2130-AC20 State Highway-Rail Grade Crossing Action Plans AGENCY: Federal Railroad Administration (FRA), Department of Transportation (DOT). ACTION: Final rule. SUMMARY: This final... three years, to develop State highway-rail grade crossing action plans. The final rule addresses the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 37 Patents, Trademarks, and Copyrights 1 2011-07-01 2011-07-01 false Final action. 2.64 Section 2... COMMERCE RULES OF PRACTICE IN TRADEMARK CASES Examination of Application and Action by Applicants § 2.64 Final action. (a) On the first or any subsequent reexamination or reconsideration the refusal of the...
31 CFR 800.601 - Finality of actions under section 721.
Code of Federal Regulations, 2010 CFR
2010-07-01
... (Continued) OFFICE OF INVESTMENT SECURITY, DEPARTMENT OF THE TREASURY REGULATIONS PERTAINING TO MERGERS, ACQUISITIONS, AND TAKEOVERS BY FOREIGN PERSONS Finality of Action § 800.601 Finality of actions under section...
2012-03-20
The Food and Drug Administration (FDA) is amending the packaging and labeling control provisions of the current good manufacturing practice (CGMP) regulations for human and veterinary drug products by limiting the application of special control procedures for the use of cut labeling to immediate container labels, individual unit cartons, or multiunit cartons containing immediate containers that are not packaged in individual unit cartons. FDA is also permitting the use of any automated technique, including differentiation by labeling size and shape, that physically prevents incorrect labeling from being processed by labeling and packaging equipment when cut labeling is used. This action is intended to protect consumers from labeling errors more likely to cause adverse health consequences, while eliminating the regulatory burden of applying the rule to labeling unlikely to reach or adversely affect consumers. This action is also intended to permit manufacturers to use a broader range of error prevention and labeling control techniques than permitted by current CGMPs.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Poskas, P.; Zujus, R.; Drumstas, G.
There is only one nuclear power plant in Lithuania - Ignalina NPP (INPP). The INPP operated two similar units with installed capacity of 1500 MW(each). They were commissioned in 12/1983 and 08/1987, and the original design lifetime was projected out to 2010 and 2015 respectively. But the first Unit of Ignalina NPP was shutdown December 31, 2004, and second Unit will be closed down before 2010 taking into consideration substantial long-term financial assistance from the EU, G7 and other states as well as international institutions. Implementation of dismantling activities requires detailed knowledge of the radiological situation at the Unit 1.more » General Programme of Radiological Survey for Ignalina NPP Unit 1 based on NUREG-1575 was prepared in 2005- 2006 by Consortium led by Lithuanian Energy Institute and approved by Regulatory Bodies. It includes such main steps as historical site assessment, scoping, characterization, remedial actions/decontamination support surveys and final status surveys. General Programme of Radiological Survey defines content and principles of the surveys, and preliminary survey considerations, including identification of the contaminants, establishment of the free release levels, principles on areas classification depending on contamination potential, identification of the final survey units, criteria for selection survey instrumentation, techniques and methods etc. So, in the paper information on these principles and the content of the different stages in General Programme of Radiological Survey is presented. (authors)« less
17 CFR 1.67 - Notification of final disciplinary action involving financial harm to a customer.
Code of Federal Regulations, 2010 CFR
2010-04-01
... disciplinary action involving financial harm to a customer. 1.67 Section 1.67 Commodity and Securities... Miscellaneous § 1.67 Notification of final disciplinary action involving financial harm to a customer. (a) Definitions. For purposes of this section: (1) Final disciplinary action means any decision by or settlement...
77 FR 37953 - Final Federal Agency Actions on Proposed Bridge Replacement in Massachusetts
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-25
... Proposed Bridge Replacement in Massachusetts AGENCY: Federal Highway Administration (FHWA), DOT. ACTION... final within the meaning of 23 U.S.C. 139(l)(1). The action relates to the proposed Fore River Bridge..., 2012, the FHWA published ``Notice of Final Federal Agency Actions on Proposed Bridge in Massachusetts...
1996-10-01
Associates 1-3 0619100396 RD2 Introduction Honey Lake Valley appears to be isolated because no sin-face water flows from the valley. The United...infiltration of precipitation in upland areas and infiltration of stream flow in alluvial fan areas (Handman et al., 1990). Discharge from the...is slightly higher in elevation than the northern portion of the installation. Figure 1.5 indicates that groundwater flow is generally to the north
1993-06-01
world events, political policy will have a greater impact on military strategy (necessity to achieve UN mandate in support of coalition warfare), the new...United States determine and implement optimal courses of action, allocate assets subject to environmental constraints, and direct forces against threats to...warrior. Finally, this chapter focuses the reader on the impact of technology and how the user or warrior will interact with information. A. BACKGROUND
Lehigh River Basin, Trexler Lake, Jordan Creek, Pennsylvania. Final Environmental Impact Statement.
1973-01-01
InI w-.ater table elevations in the project arra . A lmg in lnn( uti lization from prim-arily private ag-ricultural and] res ident iil.rr’ to nubli c...AND ADDRESS 10. PROGRAM ELEMENT, PROJECT , TASK U.S. Army Engineer District Philadelphia AREA & WORK UNIT NUMBERS 2nd & Chestnut Sts. / I Philadelphia...Administrative ( ) Legislative 2. Description of Action. The Trexler project is located in Lehigh County in southeastern Pennsylvania. The dfm site is
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-07-01
This document provides an analysis of the potential impacts associated with the proposed action, which is continued operation of Naval Petroleum Reserve No. I (NPR-1) at the Maximum Efficient Rate (MER) as authorized by Public law 94-258, the Naval Petroleum Reserves Production Act of 1976 (Act). The document also provides a similar analysis of alternatives to the proposed action, which also involve continued operations, but under lower development scenarios and lower rates of production. NPR-1 is a large oil and gas field jointly owned and operated by the federal government and Chevron U.SA Inc. (CUSA) pursuant to a Unit Planmore » Contract that became effective in 1944; the government`s interest is approximately 78% and CUSA`s interest is approximately 22%. The government`s interest is under the jurisdiction of the United States Department of Energy (DOE). The facility is approximately 17,409 acres (74 square miles), and it is located in Kern County, California, about 25 miles southwest of Bakersfield and 100 miles north of Los Angeles in the south central portion of the state. The environmental analysis presented herein is a supplement to the NPR-1 Final Environmental Impact Statement of that was issued by DOE in 1979 (1979 EIS). As such, this document is a Supplemental Environmental Impact Statement (SEIS).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
John McCord
2007-05-01
This document, which makes changes to Groundwater Flow Model of Corrective Action Units 101 and 102: Central and Western Pahute Mesa, Nevada Test Site, Nye County, Nevada, S-N/99205--076, Revision 0 (June 2006) was prepared to address review comments of this final document by the Nevada Division of Environmental Protection (NDEP) in a letter dated July 19, 2006. The document includes revised pages that address NDEP review comments and comments from other document users. Change bars are included on these pages to identify where the text was revised. In addition to the revised pages, the following clarifications are made: • Onmore » Plate 1 (inserted in the back of the document), the ET Unit legend has been revised. The revised Plate 1 is included and replaces the original Plate 1. • Some of the Appendix D perturbation sensitivity analysis plots included on the CD for Sections D.3.1 and D.3.2 were not properly aligned. A revised CD is provided with all plots properly aligned.« less
Madrigal-Garcia, Maria Isabel; Rodrigues, Marcos; Shenfield, Alex; Singer, Mervyn; Moreno-Cuesta, Jeronimo
2018-07-01
To identify facial expressions occurring in patients at risk of deterioration in hospital wards. Prospective observational feasibility study. General ward patients in a London Community Hospital, United Kingdom. Thirty-four patients at risk of clinical deterioration. A 5-minute video (25 frames/s; 7,500 images) was recorded, encrypted, and subsequently analyzed for action units by a trained facial action coding system psychologist blinded to outcome. Action units of the upper face, head position, eyes position, lips and jaw position, and lower face were analyzed in conjunction with clinical measures collected within the National Early Warning Score. The most frequently detected action units were action unit 43 (73%) for upper face, action unit 51 (11.7%) for head position, action unit 62 (5.8%) for eyes position, action unit 25 (44.1%) for lips and jaw, and action unit 15 (67.6%) for lower face. The presence of certain combined face displays was increased in patients requiring admission to intensive care, namely, action units 43 + 15 + 25 (face display 1, p < 0.013), action units 43 + 15 + 51/52 (face display 2, p < 0.003), and action units 43 + 15 + 51 + 25 (face display 3, p < 0.002). Having face display 1, face display 2, and face display 3 increased the risk of being admitted to intensive care eight-fold, 18-fold, and as a sure event, respectively. A logistic regression model with face display 1, face display 2, face display 3, and National Early Warning Score as independent covariates described admission to intensive care with an average concordance statistic (C-index) of 0.71 (p = 0.009). Patterned facial expressions can be identified in deteriorating general ward patients. This tool may potentially augment risk prediction of current scoring systems.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-23
... ENVIRONMENTAL PROTECTION AGENCY [FRL-9179-3 ] Clean Water Act Section 303(d): Final Agency Action on One Arkansas Total Maximum Daily Load (TMDL) AGENCY: Environmental Protection Agency (EPA). ACTION: Notice of availability. SUMMARY: This notice announces the final agency action on one TMDL established by...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
...: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is taking final action to correct an... ozone. EPA is also taking final action to revise the boundaries of certain Southern California air...-2012-0936 for this action. The index to the docket is available electronically at www.regulations.gov...
Hossner, Ernst-Joachim
2009-01-01
The problem of a bidirectional link between thought and action is approached from the perspective of cognitive movement science. The metaphor of the "Badische Zimmer" - an adaptation of Searle's Chinese room metaphor - is used to illustrate shortcomings in the classical conception of linear information processing and to introduce some features which current theories of movement control and learning should embrace. On this basis, the case is made for a return to an ideomotor view of motor control and learning based on effect prediction (E') as a function of the situational context (S') and one's own motor responses (R'). The relevance of the derived concept of sensorimotor chains linking elementary S'R'E' units in the course of motor learning is finally discussed with respect to potential implications for an integrative theory of perception, action, and decision making.
A global assessment of the conservation status of the American Oystercatcher Haematopus palliatus
Clay, Robert P.; Lesterhuis, Arne J.; Schulte, Shiloh A.; Brown, Stephen; Reynolds, Debra; Simons, Theodore R.
2014-01-01
To address these threats, conservation actions are proposed that focus on increased legal protection for the species and on the conservation of key sites and important habitats. Conservation could include implementing beneficial management practices, such as restoration of nest and roost sites, controlling predation, and reducing disturbance. Education and outreach programs are needed throughout the species’ range, especially for beach users and urban planners. Training programs will be necessary to ensure successful implementation of many of the priority conservation actions. Finally, a key first step in conserving this species across its range is the creation of a H. palliatus Working Group. Modelled after the U.S. American Oystercatcher Working Group this organization could unite researchers, conservationists, and educators from across the hemisphere to foster coordinated research, conservation action, and monitoring as outlined in this assessment.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
Corrective Action Unit (CAU) 371 is located in Areas 11 and 18 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 371 is comprised of the two corrective action sites (CASs) listed below: • 11-23-05, Pin Stripe Contamination Area • 18-45-01, U-18j-2 Crater (Johnnie Boy) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation before evaluating corrective action alternatives and selecting the appropriate correctivemore » action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on November 19, 2008, by representatives of the Nevada Division of Environmental Protection; U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office; Stoller-Navarro Joint Venture; and National Security Technologies, LLC. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 371. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 371 includes the following activities: • Move surface debris and/or materials, as needed, to facilitate sampling. • Conduct radiological surveys. • Measure in situ external dose rates using thermoluminescent dosimeters or other dose measurement devices. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates. • Combine internal and external dose rates to determine whether total dose rates exceed final action levels (FALs). • Collect and submit environmental samples for laboratory analysis to determine whether chemical contaminants are present at concentrations exceeding FALs. • If contamination exceeds FALs, define the extent of the contamination exceeding FALs. • Investigate waste to determine whether potential source material is present. This Corrective Action Investigation Plan has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy; and U.S. Department of Defense. Under the Federal Facility Agreement and Consent Order, this Corrective Action Investigation Plan will be submitted to the Nevada Division of Environmental Protection for approval. Fieldwork will be conducted following approval of the plan.« less
Action Recognition Using Nonnegative Action Component Representation and Sparse Basis Selection.
Wang, Haoran; Yuan, Chunfeng; Hu, Weiming; Ling, Haibin; Yang, Wankou; Sun, Changyin
2014-02-01
In this paper, we propose using high-level action units to represent human actions in videos and, based on such units, a novel sparse model is developed for human action recognition. There are three interconnected components in our approach. First, we propose a new context-aware spatial-temporal descriptor, named locally weighted word context, to improve the discriminability of the traditionally used local spatial-temporal descriptors. Second, from the statistics of the context-aware descriptors, we learn action units using the graph regularized nonnegative matrix factorization, which leads to a part-based representation and encodes the geometrical information. These units effectively bridge the semantic gap in action recognition. Third, we propose a sparse model based on a joint l2,1-norm to preserve the representative items and suppress noise in the action units. Intuitively, when learning the dictionary for action representation, the sparse model captures the fact that actions from the same class share similar units. The proposed approach is evaluated on several publicly available data sets. The experimental results and analysis clearly demonstrate the effectiveness of the proposed approach.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
2006-09-01
This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit 274, Septic Systems, Nevada Test Site (NTS), Nevada in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit (CAU) 274 is comprised of five corrective action sites (CASs): (1) CAS 03-02-01, WX-6 ETS Building Septic System; (2) CAS 06-02-01, Cesspool; (3) CAS 09-01-01, Spill Site; (4) CAS 09-05-01, Leaching Pit; and (5) CAS 20-05-01, Septic System. The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the closure of CAU 274 with no further corrective action. Tomore » achieve this, corrective action investigation (CAI) activities were performed from November 14 through December 17, 2005 as set forth in the CAU 274 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If contaminants of concern are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 274 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. No analytes were detected at concentrations exceeding the FALs. No COCs have been released to the soil at CAU 274, and corrective action is not required. Therefore, the DQO data needs were met, and it was determined that no corrective action based on risk to human receptors is necessary for the site. All FALs were calculated using the industrial site worker scenario except for benzo(a)pyrene, which was calculated based on the occasional use scenario. Benzo(a)pyrene was detected above the preliminary action level at CAS 20-05-01; however, it was not identified as a COC because the concentration was below the FAL. As a best management practice and to ensure that future site workers are not exposed to this site contaminant for more than this decision-basis exposure duration, an administrative use restriction was established around the leachfield at CAS 20-05-01. In addition, the removal of the septic tanks and septic tank contents at CASs 03-02-01, 06-02-01, and 20-05-01 was performed.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-30
... Ambient Air Quality Standard (NAAQS) AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule... of the 1997 8-hour ozone NAAQS as of the applicable date. DATES: Effective Date: This final rule will... action is EPA taking in this final rule? II. What is the background for this final action? III. What was...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 573: Alpha Contaminated Sites, Nevada National Security Site, Nevada. CAU 573 comprises the two corrective action sites (CASs): 05-23-02-GMX Alpha Contaminated Are-Closure in Place and 05-45-01-Atmospheric Test Site - Hamilton- Clean Closure. The purpose of this CR is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 573 based on the implementation of the corrective actions. Corrective action activities were performed at Hamilton from May 25 through June 30, 2016; and at GMX from May 25 to Octobermore » 27, 2016, as set forth in the Corrective Action Decision Document (CADD)/Corrective Action Plan (CAP) for Corrective Action Unit 573: Alpha Contaminated Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices. Verification sample results were evaluated against data quality objective criteria developed by stakeholders that included representatives from the Nevada Division of Environmental Protection and the DOE, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) during the corrective action alternative (CAA) meeting held on November 24, 2015. Radiological doses exceeding the final action level were assumed to be present within the high contamination areas associated with CAS 05-23-02, thus requiring corrective action. It was also assumed that radionuclides were present at levels that require corrective action within the soil/debris pile associated with CAS 05-45-01. During the CAU 573 CAA meeting, the CAA of closure in place with a use restriction (UR) was selected by the stakeholders as the preferred corrective action of the high contamination areas at CAS 05-23-02 (GMX), which contain high levels of removable contamination; and the CAA of clean closure was selected by the stakeholders as preferred corrective action for the debris pile at CAS 05-45-01 (Hamilton). The closure in place was accomplished by posting signs containing a warning label on the existing contamination area fence line; and recording the FFACO UR and administrative UR in the FFACO database, the NNSA/NFO CAU/CAS files, and the management and operating contractor Geographic Information Systems. The clean closure was accomplished by excavating the soil/debris pile, disposing of the contents at the Area 5 Radioactive Waste Management Complex, and collecting verification samples. The corrective actions were implemented as stipulated in the CADD/CAP, and verification sample results confirm that the criteria for the completion of corrective actions have been met. Based on the implementation of these corrective actions, NNSA/NFO provides the following recommendations: No further corrective actions are necessary for CAU 573; The Nevada Division of Environmental Protection should issue a Notice of Completion to NNSA/NFO for closure of CAU 573; CAU 573 should be moved from Appendix III to Appendix IV of the FFACO.« less
1979-01-01
stemming from different backgrounds, and goals, could introduce new" versus "old" conflicts in politics, customs , and everyday social inter- action...determined. It would also be difficult to estimate the extent to which such facilities would be used by those workers who represent pntential customers . Car...during other hours of the day. The use of rail transport would depend upon desti- nations, customers ’ locations, and the ability of the receiver to
78 FR 58380 - Notice of Final Federal Agency Actions on Proposed Highway in Illinois
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
... limitation on claims for judicial review of actions by FHWA and other Federal agencies. SUMMARY: This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C.... DATES: By this notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139...
78 FR 58381 - Notice of Final Federal Agency Actions on State Highway 288 in Texas
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
... final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal... limitation on claims for judicial review of actions by FHWA and other Federal agencies. SUMMARY: This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C...
Explicit Reflective Nature of Science Instruction: Evolution, Intelligent Design, and Umbrellaology
NASA Astrophysics Data System (ADS)
Scharmann, Lawrence C.; Smith, Mike U.; James, Mark C.; Jensen, Murray
2005-02-01
The investigators sought to design an instructional unit to enhance an understanding of the nature of science (NOS) by taking into account both instructional best practices and suggestions made by noted science philosopher Thomas Kuhn. Preservice secondary science teachers enrolled in a course, Laboratory Techniques in the Teaching of Science, served as participants in action research. Sources of data used to inform instructional decisions included students written reaction papers to the assigned readings, transcribed verbal comments made during class discussions and other in-class activities, and final reflection essays. Three iterative implementations of the instructional unit were attempted. The objectives of the study were essentially met. The instructional unit was able to provoke preservice teachers into wrestling with many substantive issues associated with the NOS. Implications concerning the design of explicit reflective NOS instruction are included.
10 CFR 473.24 - Final action and certification by manager.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 3 2013-01-01 2013-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...
10 CFR 473.24 - Final action and certification by manager.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 3 2011-01-01 2011-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...
10 CFR 473.24 - Final action and certification by manager.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 3 2010-01-01 2010-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...
10 CFR 473.24 - Final action and certification by manager.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 3 2012-01-01 2012-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...
10 CFR 473.24 - Final action and certification by manager.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 3 2014-01-01 2014-01-01 false Final action and certification by manager. 473.24 Section 473.24 Energy DEPARTMENT OF ENERGY ENERGY CONSERVATION AUTOMOTIVE PROPULSION RESEARCH AND DEVELOPMENT Review and Certification of Grants, Cooperative Agreements, Contracts, and Projects § 473.24 Final action...
42 CFR 93.406 - Final HHS actions.
Code of Federal Regulations, 2010 CFR
2010-10-01
... MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues... prescribed in § 93.501, the ORI finding of research misconduct is the final HHS action on the research misconduct issues and the HHS administrative actions become final and will be implemented, except that the...
Code of Federal Regulations, 2010 CFR
2010-07-01
... on behalf of the applicant; (4) The decision of the DRB; (5) Advisory opinions relief upon for the final action; and (6) The final action on the DRB decision by the Commandant or Secretary. (b) The... the decision of the DRB and the final action thereon is made available for public inspection and...
29 CFR 1990.147 - Final action.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 29 Labor 9 2010-07-01 2010-07-01 false Final action. 1990.147 Section 1990.147 Labor Regulations Relating to Labor (Continued) OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR (CONTINUED... Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of...
77 FR 47517 - Enforcement Actions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
... DEPARTMENT OF THE INTERIOR National Indian Gaming Commission 25 CFR Part 573 Enforcement Actions AGENCY: National Indian Gaming Commission. ACTION: Final rule. SUMMARY: The National Indian Gaming... be considered final agency action by a court even though it is issued by NIGC staff rather than the...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the August 2004, Closure Report for Corrective Action Unit 271, Areas 25, 26, and 27 Septic Systems as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the modification of the UR for CAS 27-05-02, Leachfield. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify the UR to an administrative UR. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). This Administrative UR was based on an “Occasional Use Area” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 400 total work hours). Any proposed activity within this use restricted area that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining postings at this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 1999, Closure Report for Corrective Action Unit 427: Area 3 Septic Waste Systems 2, 6, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-05-002-SW02, Septic Waste System • CAS 03-05-002-SW06, Septic Waste System These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 452: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 25-25-09, Spill H940825C (from UST 25-3101-1) • 25-25-14, Spill H940314E (from UST 25-3102-3) • 25-25-15, Spill H941020E (from UST 25-3152-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 1998, Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 12-25-09, Spill 960722-02 (from UST 12-B-3). This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the June 2003, Closure Report for Corrective Action Unit 335: Area 6 Injection Well and Drain Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 06-20-02, 20-inch Cased Hole • CAS 06-23-03, Drain Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the November 2002, Closure Report for Corrective Action Unit 356: Mud Pits and Disposal Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: •more » This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 03-04-01, Area 3 Change House Septic System • CAS 03-09-04, Mud Pit These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 2003, Closure Report for Corrective Action Unit 398: Area 25 Spill Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-25-17, Subsurface Hydraulic Oil Spill. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Grant Evenson
This document constitutes an addendum to the Streamlined Approach for Environmental Restoration Closure Report for Corrective Action Unit 454: Historical Underground Storage Tank Release Sites, Nevada Test Site, Nevada, April 1998 as described in the document Supplemental Investigation Report for FFACO Use Restrictions, Nevada Test Site, Nevada (SIR) dated November 2008. The SIR document was approved by NDEP on December 5, 2008. The approval of the SIR document constituted approval of each of the recommended UR removals. In conformance with the SIR document, this addendum consists of: • This page that refers the reader to the SIR document for additionalmore » information • The cover, title, and signature pages of the SIR document • The NDEP approval letter • The corresponding section of the SIR document This addendum provides the documentation justifying the cancellation of the URs for CASs: • 12-25-08, Spill H950524F (from UST 12-B-1) • 12-25-10, Spill H950919A (from UST 12-COMM-1) These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the July 1999, Closure Report for Corrective Action Unit 423: Area 3 Building 0360 Underground Discharge Point, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modificationmore » document, this addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 03-02-002-0308, Underground Discharge Point. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 2006, Closure Report for Corrective Action Unit 214: Bunkers and Storage Areas as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 25-23-01, Contaminated Materials • CAS 25-23-19, Radioactive Material Storage These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the April 2000, Closure Report for Corrective Action Unit 342: Area 23 Mercury Fire Training Pit as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of:more » • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the UR for CAS 23-56-01, Former Mercury Fire Training Pit. This UR was established as part of a Federal Facility Agreement and Consent Order (FFACO) corrective action and is based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove the UR because contamination is not present at the site above the risk-based FALs. Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at this site will be removed. Fencing and posting may be present at this site that are unrelated to the FFACO UR such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at this site.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the June 2006, Closure Report for Corrective Action Unit 322: Areas 1 & 3 Release Sites and Injection Wells as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 01-25-01, AST Release • CAS 03-25-03, Mud Plant AST Diesel Release These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
ERIC Educational Resources Information Center
Galligani, Dennis J.
This second volume of the University of California, Irvine (UCI), Student Affirmative Action (SAA) Five-Year Plan contains the complete student affirmative action plans as submitted by 33 academic and administrative units at UCI. The volume is organized by type of unit: academic units, academic retention units, outreach units, and student life…
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-21
...NMFS is implementing final 2012 specifications and management measures for Atlantic mackerel (mackerel), and 2012-2014 specifications for Illex and longfin squid, and interim final 2012 specifications and management measures for butterfish. This is the first year that the specifications are being set for Atlantic mackerel and butterfish under the provisions of the Mid-Atlantic Fishery Management Council's (Council) Annual Catch Limit and Accountability Measure Omnibus Amendment. This action also adjusts the closure threshold for the commercial mackerel fishery to 95 percent (from 90 percent), and allows the use of jigging gear to target longfin squid if the longfin squid fishery is closed due to the butterfish mortality cap. Finally, this rule makes minor corrections in existing regulatory text to clarify the intent of the regulations. These specifications and management measures promote the utilization and conservation of the Atlantic Mackerel, Squid, and Butterfish (MSB) resource.
Evapotranspiration Cover for the 92-Acre Area Retired Mixed Waste Pits:Interim CQA Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
The Delphi Groupe, Inc., and J. A. Cesare and Associates, Inc.
This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. This Interim Construction Quality Assurance (CQA) Report is for the 92-Acre Evapotranspiration Cover, Area 5 Waste Management Division (WMD) Retired Mixed Waste Pits, Nevada National Security Site, Nevada for the period of January 20, 2011 to May 12, 2011. Construction was approved by the Nevada Division of Environmental Protection (NDEP) under the Approval of Corrective Action Decision Document/Corrective Action Plan (CADD/CAP)more » for Corrective Action Unit (CAU) 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada, on January 6, 2011, pursuant to Subpart XII.8a of the Federal Facility Agreement and Consent Order. The project is located in Area 5 of the Radioactive Waste Management Complex (RWMC) at the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, located in southern Nevada, approximately 65 miles northwest of Las Vegas, Nevada, in Nye County. The project site, in Area 5, is located in a topographically closed basin approximately 14 additional miles north of Mercury Nevada, in the north-central part of Frenchman Flat. The Area 5 RWMS uses engineered shallow-land burial cells to dispose of packaged waste. The 92-Acre Area encompasses the southern portion of the Area 5 RWMS, which has been designated for the first final closure operations. This area contains 13 Greater Confinement Disposal (GCD) boreholes, 16 narrow trenches, and 9 broader pits. With the exception of two active pits (P03 and P06), all trenches and pits in the 92-Acre Area had operational covers approximately 2.4 meters thick, at a minimum, in most areas when this project began. The units within the 92-Acre Area are grouped into the following six informal categories based on physical location, waste types and regulatory requirements: (1) Pit 3 Mixed Waste Disposal Unit (MWDU); (2) Corrective Action Unit (CAU) 111; (3) CAU 207; (4) Low-level waste disposal units; (5) Asbestiform low-level waste disposal units; and (6) One transuranic (TRU) waste trench.« less
A Neural Basis of Facial Action Recognition in Humans
Srinivasan, Ramprakash; Golomb, Julie D.
2016-01-01
By combining different facial muscle actions, called action units, humans can produce an extraordinarily large number of facial expressions. Computational models and studies in cognitive science and social psychology have long hypothesized that the brain needs to visually interpret these action units to understand other people's actions and intentions. Surprisingly, no studies have identified the neural basis of the visual recognition of these action units. Here, using functional magnetic resonance imaging and an innovative machine learning analysis approach, we identify a consistent and differential coding of action units in the brain. Crucially, in a brain region thought to be responsible for the processing of changeable aspects of the face, multivoxel pattern analysis could decode the presence of specific action units in an image. This coding was found to be consistent across people, facilitating the estimation of the perceived action units on participants not used to train the multivoxel decoder. Furthermore, this coding of action units was identified when participants attended to the emotion category of the facial expression, suggesting an interaction between the visual analysis of action units and emotion categorization as predicted by the computational models mentioned above. These results provide the first evidence for a representation of action units in the brain and suggest a mechanism for the analysis of large numbers of facial actions and a loss of this capacity in psychopathologies. SIGNIFICANCE STATEMENT Computational models and studies in cognitive and social psychology propound that visual recognition of facial expressions requires an intermediate step to identify visible facial changes caused by the movement of specific facial muscles. Because facial expressions are indeed created by moving one's facial muscles, it is logical to assume that our visual system solves this inverse problem. Here, using an innovative machine learning method and neuroimaging data, we identify for the first time a brain region responsible for the recognition of actions associated with specific facial muscles. Furthermore, this representation is preserved across subjects. Our machine learning analysis does not require mapping the data to a standard brain and may serve as an alternative to hyperalignment. PMID:27098688
Srinivasan, Akhil; Tipton, John; Tahilramani, Mayank; Kharbouch, Adel; Gaupp, Eric; Song, Chao; Venkataraman, Poornima; Falcone, Jessica; Lacour, Stéphanie P; Stanley, Garrett B; English, Arthur W; Bellamkonda, Ravi V
2016-02-01
Despite significant advances in robotics, commercially advanced prosthetics provide only a small fraction of the functionality of the amputated limb that they are meant to replace. Peripheral nerve interfacing could provide a rich controlling link between the body and these advanced prosthetics in order to increase their overall utility. Here, we report on the development of a fully integrated regenerative microchannel interface with 30 microelectrodes and signal extraction capabilities enabling evaluation in an awake and ambulatory rat animal model. In vitro functional testing validated the capability of the microelectrodes to record neural signals similar in size and nature to those that occur in vivo. In vitro dorsal root ganglia cultures revealed striking cytocompatibility of the microchannel interface. Finally, in vivo, the microchannel interface was successfully used to record a multitude of single-unit action potentials through 63% of the integrated microelectrodes at the early time point of 3 weeks. This marks a significant advance in microchannel interfacing, demonstrating the capability of microchannels to be used for peripheral nerve interfacing. © 2015 Federation of European Neuroscience Societies and John Wiley & Sons Ltd.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
2003-08-06
This Proposed Plan (PP) presents the preferred alternative for addressing contaminated groundwater and springs at the Chemical Plant area of the Weldon Spring site, in Weldon Spring, Missouri. The site is located about 30 mi west of St. Louis, in St. Charles County (Figure 1). This proposed action constitutes the final remedial action for the Weldon Spring site. The residual contamination in groundwater and springs at the Chemical Plant area is the only remaining contamination that needs to be addressed for the site. All other contamination has been addressed by previous remedial actions. After this remedial action is implemented, long-termmore » surveillance and maintenance activities will maintain the effectiveness of all remedial actions conducted at the Weldon Spring site, including this final remedial action for groundwater and springs that is being proposed in this plan. DOE complies with the requirements of the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) in conducting remedial activities at the site. National Environmental Policy Act (NEPA) values have been incorporated into the CERCLA process; that is, the analysis conducted and presented in the remedial investigation/feasibility study (RI/FS) reports included an evaluation of environmental impacts that is comparable to that performed under NEPA. This PP is required under CERCLA to (1) notify the public and present a brief analysis of the remedial action alternatives, (2) identify and present the rationale for the preferred remedial action alternative identified in the PP, (3) summarize key information from the RI/FS evaluations, including the Baseline Risk Assessment (BRA), and (4) inform the public of its role in the remedy selection process and give the public the opportunity to participate in the process. Remediation activities at the Weldon Spring site have been coordinated with the U.S. Environmental Protection Agency (EPA) and the Missouri Department of Natural Resources (MDNR). The EPA has overall oversight and approval authority, with consultation provided by the MDNR. A range of alternatives was considered in identifying the preferred alternative. The alternatives were developed after careful analysis of geological, environmental, and human health and ecological risk data and an evaluation of the effectiveness, implementability, and cost of the various technologies available for groundwater remediation at the Chemical Plant area. Monitored natural attenuation (MNA) coupled with institutional controls (ICs) and contingency activities has been selected as the preferred alternative.« less
The Evidence Regarding Maintenance Tocolysis
Elliott, John P.; Morrison, John C.
2013-01-01
Preterm delivery is a public health issue of major proportion. More than 12% of deliveries in the United States that occur at less than 37 weeks gestation preterm labor (PTL) represents the largest single reason for preterm birth (PTB). Attempts to prevent PTB have been unsuccessful. This paper of maintenance tocolytic therapy will examine the efficacy and safety of the drugs, both oral and subcutaneous, which have been utilized for prolongation of pregnancy following successful arrest of a documented episode of acute preterm labor. The evidence for oral tocolytics as maintenance therapy as well as parenteral medications for such patients is offered. Finally, the effects in the United States of the Food and Drug Administration (FDA) action on such medications are reported. PMID:23577034
Barriales-Villa, Roberto; Gimeno-Blanes, Juan Ramón; Zorio-Grima, Esther; Ripoll-Vera, Tomás; Evangelista-Masip, Artur; Moya-Mitjans, Angel; Serratosa-Fernández, Luis; Albert-Brotons, Dimpna C; García-Pinilla, José Manuel; García-Pavía, Pablo
2016-03-01
The term inherited cardiovascular disease encompasses a group of cardiovascular diseases (cardiomyopathies, channelopathies, certain aortic diseases, and other syndromes) with a number of common characteristics: they have a genetic basis, a familial presentation, a heterogeneous clinical course, and, finally, can all be associated with sudden cardiac death. The present document summarizes some important concepts related to recent advances in sequencing techniques and understanding of the genetic bases of these diseases. We propose diagnostic algorithms and clinical practice recommendations and discuss controversial aspects of current clinical interest. We highlight the role of multidisciplinary referral units in the diagnosis and treatment of these conditions. Copyright © 2015 Sociedad Española de Cardiología. Published by Elsevier España, S.L.U. All rights reserved.
Endocrinology of human parturition.
Vannuccini, Silvia; Bocchi, Caterina; Severi, Filiberto M; Challis, John R; Petraglia, Felice
2016-06-01
The mechanisms involved in human pregnancy maintenance and parturition are highly complex and involve mother, fetus and placenta. The "final common pathway" to delivery is composed by inflammatory and endocrine interactive paths that tip the balance in favor of coordinated uterine contractility and cervical dilation. These mechanisms involve a shift from progesterone to estrogen dominance, CRH action, increased sensitivity to oxytocin, gap junction formation, and increased prostaglandins activity. Complementary changes in the cervix involve a decrease in progesterone dominance and the actions of prostaglandins and relaxin, via connective tissue alterations, leading to cervical softening and dilation. Neuronal, hormonal, inflammatory and immune pathways participate in initiation of labor and the utero-placental unit plays a major role in the synthesis and release of parturition mediators. Copyright © 2016 Elsevier Masson SAS. All rights reserved.
Code of Federal Regulations, 2014 CFR
2014-04-01
... RESPONSIBILITY ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member... well as the Proceeding Clerk and Secretary of the Commission, with a written notice of any final...
ERIC Educational Resources Information Center
Southern Regional Education Board (SREB), 2010
2010-01-01
The Southern Regional Education Board (SREB) follows education budgets and legislation during regular and special legislative sessions. The Legislative Reports follow education and budget issues from governors' proposals through final legislative actions in each of the 16 SREB states. This report presents final legislative and budget actions in…
77 FR 66910 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-07
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in California AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice...). A claim seeking judicial review of the Federal agency actions on the highway project will be barred...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
This decision document presents the selected remedial action for Operable Unit 4 of the Fernald Site in Fernald, Ohio. The materials within Operable Unit 4 exhibit a wide range of properties. Most notable would be the elevated direct radiation associated with the K-65 residues versus the much lower direct radiation associated with cold metal oxides in Silo 3. Even more significant would be the much lower levels of contamination associated with the soils and building materials, like concrete, within the Operable Unit 4 Study Area. On the basis of the evaluation of final alternatives, the selected remedy addressing Operable Unitmore » 4 at the FEMP is a combination of Alternatives 3A.1/Vit - Removal, Vitrification, and Off-site Disposal - Nevada Test Site (NTS); 3B.1/Vit - Removal, Vitrification, and Off-site Disposal - NTS; and 2C - Demolition, Removal and On-Property Disposal.« less
Code of Federal Regulations, 2012 CFR
2012-04-01
... ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member responsibility... the Proceeding Clerk and Secretary of the Commission, with a written notice of any final decision in a...
Code of Federal Regulations, 2013 CFR
2013-04-01
... ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member responsibility... the Proceeding Clerk and Secretary of the Commission, with a written notice of any final decision in a...
Code of Federal Regulations, 2010 CFR
2010-04-01
... ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member responsibility... the Proceeding Clerk and Secretary of the Commission, with a written notice of any final decision in a...
Code of Federal Regulations, 2011 CFR
2011-04-01
... ACTIONS Commission Review of Decisions by the National Futures Association In Member Responsibility Actions § 171.42 Notice of a final decision of the National Futures Association in a member responsibility... the Proceeding Clerk and Secretary of the Commission, with a written notice of any final decision in a...
Kennedy, Susan
2016-01-01
Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus “alcohol culture.” Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one’s community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course. PMID:27385923
Motor Synergies and the Equilibrium-Point Hypothesis
Latash, Mark L.
2010-01-01
The article offers a way to unite three recent developments in the field of motor control and coordination: (1) The notion of synergies is introduced based on the principle of motor abundance; (2) The uncontrolled manifold hypothesis is described as offering a computational framework to identify and quantify synergies; and (3) The equilibrium-point hypothesis is described for a single muscle, single joint, and multi-joint systems. Merging these concepts into a single coherent scheme requires focusing on control variables rather than performance variables. The principle of minimal final action is formulated as the guiding principle within the referent configuration hypothesis. Motor actions are associated with setting two types of variables by a controller, those that ultimately define average performance patterns and those that define associated synergies. Predictions of the suggested scheme are reviewed, such as the phenomenon of anticipatory synergy adjustments, quick actions without changes in synergies, atypical synergies, and changes in synergies with practice. A few models are briefly reviewed. PMID:20702893
Motor synergies and the equilibrium-point hypothesis.
Latash, Mark L
2010-07-01
The article offers a way to unite three recent developments in the field of motor control and coordination: (1) The notion of synergies is introduced based on the principle of motor abundance; (2) The uncontrolled manifold hypothesis is described as offering a computational framework to identify and quantify synergies; and (3) The equilibrium-point hypothesis is described for a single muscle, single joint, and multijoint systems. Merging these concepts into a single coherent scheme requires focusing on control variables rather than performance variables. The principle of minimal final action is formulated as the guiding principle within the referent configuration hypothesis. Motor actions are associated with setting two types of variables by a controller, those that ultimately define average performance patterns and those that define associated synergies. Predictions of the suggested scheme are reviewed, such as the phenomenon of anticipatory synergy adjustments, quick actions without changes in synergies, atypical synergies, and changes in synergies with practice. A few models are briefly reviewed.
Kennedy, Susan
2016-01-01
Alcohol abuse continues to be an issue of major concern for the health and well-being of college students. Estimates are that over 80% of college students are involved in the campus "alcohol culture." Annually, close to 2000 students die in the United States due to alcohol-related accidents, with another 600,000 sustaining injury due to alcohol-related incidents (NIAAA, 2013). Students enrolled in a Psychopharmacology course engaged in action projects (community outreach) focused on alcohol abuse on our campus. Research has indicated that these types of projects can increase student engagement in course material and foster important skills, including working with peers and developing involvement in one's community. This paper describes the structure and requirements of five student outreach projects and the final projects designed by the students, summarizes the grading and assessment of the projects, and discusses the rewards and challenges of incorporating such projects into a course.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This letter serves as the post-closure monitoring letter report for the above Corrective Action Unit (CAU) for the period October 2006-September 2007. Quarterly inspections were conducted on December 20,2006; March 29,2007; June 13,2007; and September 27, 2007, to observe the condition of the gate, use restriction warning signs, monuments, fencing, trenches, soil covers, and monitoring well covers. The first inspection was conducted on December 20,2006. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. No issues or concerns were identified, and no corrective actions were recommended. Themore » second inspection was conducted on March 29,2007. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. Vegetation that was observed to be growing in several locations on the cover was the only identified concern, for which removal was recommended. Vegetation was removed on May 24,2007. The third inspection was conducted on June 13,2007. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. No issues or concerns were identified, and no corrective actions were recommended. The fourth inspection was conducted on September 27,2007. Signs, fencing, riprap, monuments, and monitoring well covers were in excellent condition. No cracking, erosion, or subsidence was observed on the covers. No issues or concerns were identified, and no corrective actions were recommended. The post-closure inspection checklists for CAU 112 are attached. Photographs and field notes taken during site inspections are maintained in the project files.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-21
...On January 30, 2012, the EPA proposed revisions to several provisions of the final National Emission Standards for Hazardous Air Pollutants for Chemical Manufacturing Area Sources. The proposed revisions were made, in part, in response to a petition for reconsideration received by the Administrator following the promulgation of the October 29, 2009, final rule (``2009 final rule''). In this action, the EPA is finalizing those amendments, lifting the stay of the title V permit requirement issued on March 14, 2011, and lifting the stay of the final rule issued on October 25, 2012. In addition, this final action includes revisions to the EPA's approach for addressing malfunctions and standards applicable during startup and shutdown periods. This final action also includes amendments and technical corrections to the final rule to clarify applicability and compliance issues raised by stakeholders subject to the 2009 final rule. The revisions to the final rule do not reduce the level of environmental protection or emissions control on sources regulated by this rule but provide flexibility and clarity to improve implementation. This action also extends the compliance date for existing sources and the EPA's final response to all issues raised in the petition for reconsideration.
78 FR 64595 - Notice of Final Federal Agency Actions on Proposed Highway in Illinois
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-29
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in Illinois AGENCY: Federal Highway Administration (FHWA), DOT. ACTION: Notice of... Sec. 139(l)(1). The actions relate to a proposed highway project, Circle Interchange, I-90/I-94 and I...
Kaci Hickox: public health and the politics of fear.
Miles, Steven H
2015-01-01
Kaci Hickox was a nurse who worked with persons who were infected with Ebola in West Africa. When she returned to the United States, the governors of New Jersey and Maine intervened to confine her to inpatient quarantine despite the fact that she was asymptomatic and had no serological evidence of infection. She defied the quarantine which resulted in enormous public attention and discussion of quarantine and public fear. This article summarizes the case discussing the history of the case, the government actions, and the final legal rulings.
U.S. National Committee for CODATA. Final technical report: September 15, 1996 to September 14, 2000
DOE Office of Scientific and Technical Information (OSTI.GOV)
Uhlir, Paul F.
2001-01-26
This report describes the activities of the U.S. National Committee (USNC) for CODATA from September 16, 1996, through September 14, 2000. The USNC/CODATA counsels the U.S. National Delegate to CODATA on the U.S. position regarding official CODATA business. It also provides a link between the United States and international data compilation and evaluation activities, taking into account the needs of the scientific and technological user community, and undertakes special studies and other actions consistent with the overall CODATA objectives.
2011-02-01
PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME(S) AND ADDRESS(ES) AMEC Earth and Environmental, Inc,104 W Anapamu...St Ste 204a,San Barbara,CA,93101 8. PERFORMING ORGANIZATION REPORT NUMBER 9. SPONSORING/MONITORING AGENCY NAME(S) AND ADDRESS(ES) 10. SPONSOR...National Ambient Air Quality Standards [NAAQS]). The USEPA require the proponent of a proposed action to perform an analysis to determine if its
78 FR 17748 - Notice of Final Federal Agency Actions on Proposed Highway in Utah
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-22
...; telephone: 801-955-3516; email: david.cox@dot.gov . The FHWA Utah Division Office's normal business hours... announces actions taken by the FWHA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions... agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the FHWA actions on the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-18
... Administration (FHWA), DOT. ACTION: Notice of limitation on claims for judicial review of actions by the..., that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to a proposed Physical... 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway...
77 FR 17565 - Notice of Final Federal Agency Actions on Proposed Transportation Improvements in Utah
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-26
.... ACTION: Notice of Limitation on Claims for Judicial Review of Actions by FHWA and Other Federal Agencies... advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or...
7 CFR 275.16 - Corrective action planning.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 7 Agriculture 4 2010-01-01 2010-01-01 false Corrective action planning. 275.16 Section 275.16... Corrective action planning. (a) Corrective action planning is the process by which State agencies shall...)/management unit(s) in the planning, development, and implementation of corrective action are those which: (1...
Powers, Randall K.; Türker, Kemal S.
2010-01-01
The amplitude and time course of synaptic potentials in human motoneurons can be estimated in tonically discharging motor units by measuring stimulus-evoked changes in the rate and probability of motor unit action potentials. However, in spite of the fact that some of these techniques have been used for over thirty years, there is still no consensus on the best way to estimate the characteristics of synaptic potentials or on the accuracy of these estimates. In this review, we compare different techniques for estimating synaptic potentials from human motor unit discharge and also discuss relevant animal models in which estimated synaptic potentials can be compared to those directly measured from intracellular recordings. We also review the experimental evidence on how synaptic noise and intrinsic motoneuron properties influence their responses to synaptic inputs. Finally, we consider to what extent recordings of single motor unit discharge in humans can be used to distinguish the contribution of changes in synaptic inputs versus changes in intrinsic motoneuron properties to altered motoneuron responses following CNS injury. PMID:20427230
77 FR 52108 - Notice of Final Federal Agency Actions on Proposed Highway in Utah
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-28
...-3516; email: David.Cox@dot.gov . The FHWA Utah Division's normal business hours are Monday through... announces actions taken by the FHWA and other Federal Agencies that are final within the meaning of 23 U.S.C... advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Love Canal (93rd Street) site is an inactive hazardous waste site located in Niagara Falls, New York. The 19-acre 93rd Street School site, one of several operable units for the Love Canal Superfund site, is the focus of the Record of Decision (ROD). The fill material is reported to contain fly ash and BHC (a pesticide) waste. The ROD amends the 1988 ROD, and addresses final remediation of onsite contaminated soil through excavation and offsite disposal. The primary contaminants of concern affecting the soil are VOCs including toluene and xylenes; other organics including PAHs and pesticides; and metals includingmore » arsenic, chromium, and lead.« less
Joint Facial Action Unit Detection and Feature Fusion: A Multi-conditional Learning Approach.
Eleftheriadis, Stefanos; Rudovic, Ognjen; Pantic, Maja
2016-10-05
Automated analysis of facial expressions can benefit many domains, from marketing to clinical diagnosis of neurodevelopmental disorders. Facial expressions are typically encoded as a combination of facial muscle activations, i.e., action units. Depending on context, these action units co-occur in specific patterns, and rarely in isolation. Yet, most existing methods for automatic action unit detection fail to exploit dependencies among them, and the corresponding facial features. To address this, we propose a novel multi-conditional latent variable model for simultaneous fusion of facial features and joint action unit detection. Specifically, the proposed model performs feature fusion in a generative fashion via a low-dimensional shared subspace, while simultaneously performing action unit detection using a discriminative classification approach. We show that by combining the merits of both approaches, the proposed methodology outperforms existing purely discriminative/generative methods for the target task. To reduce the number of parameters, and avoid overfitting, a novel Bayesian learning approach based on Monte Carlo sampling is proposed, to integrate out the shared subspace. We validate the proposed method on posed and spontaneous data from three publicly available datasets (CK+, DISFA and Shoulder-pain), and show that both feature fusion and joint learning of action units leads to improved performance compared to the state-of-the-art methods for the task.
26 CFR 301.7403-1 - Action to enforce lien or to subject property to payment of tax.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 26 Internal Revenue 18 2010-04-01 2010-04-01 false Action to enforce lien or to subject property... Proceedings Civil Actions by the United States § 301.7403-1 Action to enforce lien or to subject property to... to be filed in a district court of the United States to enforce the lien of the United States under...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-26
... (FHWA), U.S. DOT. ACTION: Notice of Limitation on Claims for Judicial Review of Actions by FHWA and... advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krauss
2010-09-01
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 408: Bomblet Target Area (TTR), Tonopah Test Range, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 408 is located at the Tonopah Test Range, Nevada, and consists of Corrective Action Site (CAS) TA-55-002-TAB2, Bomblet Target Areas. This CAS includes the following seven target areas: • Mid Target • Flightline Bomblet Location •more » Strategic Air Command (SAC) Target Location 1 • SAC Target Location 2 • South Antelope Lake • Tomahawk Location 1 • Tomahawk Location 2 The purpose of this CR is to provide documentation supporting the completed corrective actions and data confirming that the closure objectives for the CAS within CAU 408 were met. To achieve this, the following actions were performed: • Review the current site conditions, including the concentration and extent of contamination. • Implement any corrective actions necessary to protect human health and the environment. • Properly dispose of corrective action and investigation wastes. • Document Notice of Completion and closure of CAU 408 issued by the Nevada Division of Environmental Protection. From July 2009 through August 2010, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration Plan for CAU 408: Bomblet Target Area, Tonopah Test Range (TTR), Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Identify and remove munitions of explosive concern (MEC) associated with DOE activities. • Investigate potential disposal pit locations. • Remove depleted uranium-contaminated fragments and soil. • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels to determine COCs for CAU 408. Assessment of the data indicated COCs are not present at CAS TA-55-002-TAB2; therefore, no corrective action is necessary. No use restrictions are required to be placed on this CAU because the investigation showed no evidence of remaining soil contamination or remaining debris/waste upon completion of all investigation activities. The MEC was successfully removed and dispositioned as planned using current best available technologies. As MEC guidance and general MEC standards acknowledge that MEC response actions cannot determine with 100 percent certainty that all MEC and unexploded ordnance (UXO) are removed, the clean closure of CAU 408 will implement a best management practice of posting UXO hazard warning signs near the seven target areas. The signs will warn future land users of the potential for encountering residual UXO hazards. The DOE, National Nuclear Security Administration Nevada Site Office, provides the following recommendations: • A Notice of Completion to the DOE, National Nuclear Security Administration Nevada Site Office, is requested from the Nevada Division of Environmental Protection for closure of CAU 408. • Corrective Action Unit 408 should be moved from Appendix III to Appendix IV of the Federal Facility Agreement and Consent Order.« less
Automated and objective action coding of facial expressions in patients with acute facial palsy.
Haase, Daniel; Minnigerode, Laura; Volk, Gerd Fabian; Denzler, Joachim; Guntinas-Lichius, Orlando
2015-05-01
Aim of the present observational single center study was to objectively assess facial function in patients with idiopathic facial palsy with a new computer-based system that automatically recognizes action units (AUs) defined by the Facial Action Coding System (FACS). Still photographs using posed facial expressions of 28 healthy subjects and of 299 patients with acute facial palsy were automatically analyzed for bilateral AU expression profiles. All palsies were graded with the House-Brackmann (HB) grading system and with the Stennert Index (SI). Changes of the AU profiles during follow-up were analyzed for 77 patients. The initial HB grading of all patients was 3.3 ± 1.2. SI at rest was 1.86 ± 1.3 and during motion 3.79 ± 4.3. Healthy subjects showed a significant AU asymmetry score of 21 ± 11 % and there was no significant difference to patients (p = 0.128). At initial examination of patients, the number of activated AUs was significantly lower on the paralyzed side than on the healthy side (p < 0.0001). The final examination for patients took place 4 ± 6 months post baseline. The number of activated AUs and the ratio between affected and healthy side increased significantly between baseline and final examination (both p < 0.0001). The asymmetry score decreased between baseline and final examination (p < 0.0001). The number of activated AUs on the healthy side did not change significantly (p = 0.779). Radical rethinking in facial grading is worthwhile: automated FACS delivers fast and objective global and regional data on facial motor function for use in clinical routine and clinical trials.
29 CFR 1614.110 - Final action by agencies.
Code of Federal Regulations, 2013 CFR
2013-07-01
... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL... append a copy of the appeal to the final order. A copy of EEOC Form 573 shall be attached to the final... appeals and lawsuits. A copy of EEOC Form 573 shall be attached to the final action. [64 FR 37657, July 12...
29 CFR 1614.110 - Final action by agencies.
Code of Federal Regulations, 2014 CFR
2014-07-01
... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL... append a copy of the appeal to the final order. A copy of EEOC Form 573 shall be attached to the final... appeals and lawsuits. A copy of EEOC Form 573 shall be attached to the final action. [64 FR 37657, July 12...
29 CFR 1614.110 - Final action by agencies.
Code of Federal Regulations, 2011 CFR
2011-07-01
... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL... append a copy of the appeal to the final order. A copy of EEOC Form 573 shall be attached to the final... appeals and lawsuits. A copy of EEOC Form 573 shall be attached to the final action. [64 FR 37657, July 12...
29 CFR 1614.110 - Final action by agencies.
Code of Federal Regulations, 2010 CFR
2010-07-01
... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL... append a copy of the appeal to the final order. A copy of EEOC Form 573 shall be attached to the final... appeals and lawsuits. A copy of EEOC Form 573 shall be attached to the final action. [64 FR 37657, July 12...
29 CFR 1614.110 - Final action by agencies.
Code of Federal Regulations, 2012 CFR
2012-07-01
... Regulations Relating to Labor (Continued) EQUAL EMPLOYMENT OPPORTUNITY COMMISSION FEDERAL SECTOR EQUAL... append a copy of the appeal to the final order. A copy of EEOC Form 573 shall be attached to the final... appeals and lawsuits. A copy of EEOC Form 573 shall be attached to the final action. [64 FR 37657, July 12...
Serra, Jordi; Bostock, Hugh; Navarro, Xavier
2010-02-19
Microneurography is a method suitable for recording intraneural single or multiunit action potentials in conscious subjects. Microneurography has rarely been applied to animal experiments, where more invasive methods, like the teased fiber recording technique, are widely used. We have tested the feasibility of microneurographic recordings from the peripheral nerves of rats. Tungsten microelectrodes were inserted into the sciatic nerve at mid-thigh level. Single or multiunit action potentials evoked by regular electrical stimulation were recorded, digitized and displayed as a raster plot of latencies. The method allows unambiguous recording and recognition of single C-fiber action potentials from an in vivo preparation, with minimal disruption of the nerve being recorded. Multiple C-fibers can be recorded simultaneously for several hours, and if the animal is allowed to recover, repeated recording sessions can be obtained from the same nerve at the same level over a period of weeks or months. Also, single C units can be functionally identified by their changes in latency to natural stimuli, and insensitive units can be recognized as 'silent' nociceptors or sympathetic efferents by their distinctive profiles of activity-dependent slowing during repetitive electrical stimulation, or by the effect on spontaneous efferent activity of a proximal anesthetic block. Moreover, information about the biophysical properties of C axons can be obtained from their latency recovery cycles. Finally, we show that this preparation is potentially suitable for the study of C-fiber behavior in models of neuropathies and nerve lesions, both under resting conditions and in response to drug administration.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
This Corrective Action Decision Document/Corrective Action Plan provides the rationale and supporting information for the selection and implementation of corrective actions at Corrective Action Unit (CAU) 413, Clean Slate II Plutonium Dispersion (TTR). CAU 413 is located on the Tonopah Test Range and includes one corrective action site, TA-23-02CS. CAU 413 consists of the release of radionuclides to the surface and shallow subsurface from the Clean Slate II (CSII) storage–transportation test conducted on May 31, 1963. The CSII test was a non-nuclear detonation of a nuclear device located inside a concrete bunker covered with 2 feet of soil. To facilitatemore » site investigation and the evaluation of data quality objectives decisions, the releases at CAU 413 were divided into seven study groups: 1 Undisturbed Areas 2 Disturbed Areas 3 Sedimentation Areas 4 Former Staging Area 5 Buried Debris 6 Potential Source Material 7 Soil Mounds Corrective action investigation (CAI) activities, as set forth in the CAU 413 Corrective Action Investigation Plan, were performed from June 2015 through May 2016. Radionuclides detected in samples collected during the CAI were used to estimate total effective dose using the Construction Worker exposure scenario. Corrective action was required for areas where total effective dose exceeded, or was assumed to exceed, the radiological final action level (FAL) of 25 millirem per year. The results of the CAI and the assumptions made in the data quality objectives resulted in the following conclusions: The FAL is exceeded in surface soil in SG1, Undisturbed Areas; The FAL is assumed to be exceeded in SG5, Buried Debris, where contaminated debris and soil were buried after the CSII test; The FAL is not exceeded at SG2, SG3, SG4, SG6, or SG7. Because the FAL is exceeded at CAU 413, corrective action is required and corrective action alternatives (CAAs) must be evaluated. For CAU 413, three CAAs were evaluated: no further action, clean closure, and closure in place. The CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. Based on the evaluation of analytical data from the CAI, review of future and current operations at CAU 413, and the detailed and comparative analysis of CAAs, clean closure was selected as the preferred CAA for CAU 413 by the U.S. Air Force, Nevada Division of Environmental Protection, and U.S. Department of Energy at the CAA meeting held on August 24, 2016.« less
High-Temperature Graphitization Failure of Primary Superheater Tube
NASA Astrophysics Data System (ADS)
Ghosh, D.; Ray, S.; Roy, H.; Mandal, N.; Shukla, A. K.
2015-12-01
Failure of boiler tubes is the main cause of unit outages of the plant, which further affects the reliability, availability and safety of the unit. So failure analysis of boiler tubes is absolutely essential to predict the root cause of the failure and the steps are taken for future remedial action to prevent the failure in near future. This paper investigates the probable cause/causes of failure of the primary superheater tube in a thermal power plant boiler. Visual inspection, dimensional measurement, chemical analysis, metallographic examination and hardness measurement are conducted as the part of the investigative studies. Apart from these tests, mechanical testing and fractographic analysis are also conducted as supplements. Finally, it is concluded that the superheater tube is failed due to graphitization for prolonged exposure of the tube at higher temperature.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 1998, Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the modification of the UR for CAS TA-03-001-TARC Roller Coaster Lagoons. This UR was established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and was based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since this UR was established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, this UR was re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This reevaluation consisted of comparing the original data (used to define the need for the UR) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify the UR for CAS TA-03-001-TARC to an administrative UR. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). This Administrative UR was based on a “Remote Work Sites” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 336 hours per year). Any proposed activity within these use restricted areas that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining this UR will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 1998, Closure Report for Corrective Action Unit 404: Roller Coaster Lagoons and Trench, Tonopah Test Range, Nevada as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, thismore » addendum consists of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS TA-03-001-TARC Roller Coaster Lagoons • CAS TA-21-001-TARC Roller Coaster N. Disposal Trench These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to modify these URs to administrative URs. Administrative URs differ from standard URs in that they do not require onsite postings (i.e., signs) or other physical barriers (e.g., fencing, monuments), and they do not require periodic inspections (see Section 6.2 of the Industrial Sites Project Establishment of Final Action Levels [NNSA/NSO, 2006c]). These Administrative URs were based on a “Remote Work Sites” future land use scenario that was used to calculate the FAL. The administrative UR will protect workers from an exposure exceeding that used in the calculation of the FAL (i.e., 336 hours per year). Any proposed activity within these use restricted areas that would potentially cause an exposure exceeding this exposure limit would require approval from the Nevada Division of Environmental Protection (NDEP). Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
DOE /NV
This Corrective Action Decision Document has been prepared for Corrective Action Unit 340, the NTS Pesticide Release Sites, in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 340 is located at the Nevada Test Site, Nevada, and is comprised of the following Corrective Action Sites: 23-21-01, Area 23 Quonset Hut 800 Pesticide Release Ditch; 23-18-03, Area 23 Skid Huts Pesticide Storage; and 15-18-02, Area 15 Quonset Hut 15-11 Pesticide Storage. The purpose of this Corrective Action Decision Document is to identify and provide a rationale for the selection of a recommended correctivemore » action alternative for each Corrective Action Site. The scope of this Corrective Action Decision Document consists of the following tasks: Develop corrective action objectives; Identify corrective action alternative screening criteria; Develop corrective action alternatives; Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria; and Recommend and justify a preferred corrective action alternative for each Corrective Action Site.« less
Broom, Margaret; Gardner, Anne; Kecskes, Zsuzsoka; Kildea, Sue
2017-07-01
To facilitate staff transition from an open-plan to a two-cot neonatal intensive care unit design. In 2012, an Australian regional neonatal intensive care unit transitioned from an open-plan to a two-cot neonatal intensive care unit design. Research has reported single- and small-room neonatal intensive care unit design may negatively impact on the distances nurses walk, reducing the time they spend providing direct neonatal care. Studies have also reported nurses feel isolated and need additional support and education in such neonatal intensive care units. Staff highlighted their concerns regarding the impact of the new design on workflow and clinical practice. A participatory action research approach. A participatory action group titled the Change and Networking Group collaborated with staff over a four-year period (2009-2013) to facilitate the transition. The Change and Networking Group used a collaborative, cyclical process of planning, gathering data, taking action and reviewing the results to plan the next action. Data sources included meeting and workshop minutes, newsletters, feedback boards, subgroup reports and a staff satisfaction survey. The study findings include a description of (1) how the participatory action research cycles were used by the Change and Networking Group: providing examples of projects and strategies undertaken; and (2) evaluations of participatory action research methodology and Group by neonatal intensive care unit staff and Change and Networking members. This study has described the benefits of using participatory action research to facilitate staff transition from an open-plan to a two-cot neonatal intensive care unit design. Participatory action research methodology enabled the inclusion of staff to find solutions to design and clinical practice questions. Future research is required to assess the long-term effect of neonatal intensive care unit design on staff workload, maintaining and supporting a skilled workforce as well as the impact of a new neonatal intensive care unit design on the neonatal intensive care unit culture. A supportive work environment for staff is critical in providing high-quality health care. © 2016 John Wiley & Sons Ltd.
25 CFR 62.10 - Action by the Director.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Secretary for final action together with any relevant information or records; the recommendations of the... to the Assistant Secretary for final action together with any relevant information or records; the... record as presented together with such additional information as may be considered pertinent. Any...
75 FR 28851 - Notice of Final Federal Agency Actions on Proposed Highway in Washington
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-24
... of limitation on claims for judicial review of actions by FHWA. SUMMARY: This notice announces... advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed within...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-04-01
This Closure Report summarizes the corrective actions which were completed at the Corrective Action Sites within Corrective Action Unit 211 Area 15 Farm Waste Sties at the Nevada Test Site. Current site descriptions, observations and identification of wastes removed are included on FFACO Corrective Action Site housekeeping closure verification forms.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the January 2004, Closure Report for Corrective Action Unit 358: Areas 18, 19, 20 Cellars/Mud Pits as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of:more » • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 20-23-02, Postshot Cellar • CAS 20-23-03, Cellar • CAS 20-23-04, Postshot Cellar • CAS 20-23-05, Postshot Cellar • CAS 20-23-06, Cellar • CAS 20-37-01, Cellar & Mud Pit • CAS 20-37-05, Cellar These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the September 2003, Closure Report for Corrective Action Unit 394: Areas 12, 18, and 29 Spill/Release Sites as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consistsmore » of: • This cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 12-25-04, UST 12-16-2 Waste Oil Release • CAS 18-25-01, Oil Spills • CAS 18-25-02, Oil Spills • CAS 18-25-03, Oil Spill • CAS 29-44-01, Fuel Spill These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
75 FR 23311 - Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-03
... Rule 19d-1 (17 CFR 240.19d-1)--Notices by Self-Regulatory Organizations of Final Disciplinary Actions... agency concerning the following final SRO actions: (1) Disciplinary sanctions (including summary... Rule requires that such actions be promptly reported to the Commission. The Rule also requires that the...
The United States after the great recession: the challenge of sustainable growth
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meltzer, Joshua; Steven, David; Langley, Claire
2013-02-15
The paper outlines the strengths and weaknesses of the U.S. economic growth model, assesses its’ ability to respond to the key economic, environmental and social challenges currently facing the U.S. and proposes policies that if adopted would move the U.S. onto a more sustainable growth path. The paper provides scenarios of projected future growth trajectories, as well as recommendations for specific policies in key areas: employment, infrastructure, energy and fiscal rebalancing. To reach this goal this paper focuses on four areas for action: Increasing employment, which is the most urgent priority to accelerate recovery from the Great Recession, while addressingmore » underlying structural issues that have led to a decade of poor economic outcomes for most citizens; Investing in the future, as the key marker of whether the United States is prepared to make farsighted decisions to improve education, build new infrastructure and increase innovation; Maximizing an increased energy endowment in a way that grows the economy, while reinforcing the trend towards reducing resource demand and reducing greenhouse gas emissions; and, Fiscal rebalancing, where the United States must insulate economic recovery from the process of fiscal reform while reducing and stabilizing debt over the long term. Finally, we argue that President Obama can re-energize America’s global leadership if he builds on a platform of domestic actions that enhance the sustainability of America’s society and economy.« less
Road traffic incidents in Uganda: a systematic review study of a five-year trend.
Balikuddembe, Joseph Kimuli; Ardalan, Ali; Khorasani-Zavareh, Davoud; Nejati, Amir; Munanura, Kasiima Stephen
2017-01-01
Over the years, Uganda has been one of the low and middle-income countries bearing the heaviest burden of road traffic incidents (RTI). Since the proclamation of the United Nations Decade of Action for Road Safety 2011 - 2020, a number of measures have been taken to reduce the burden. However, they ought to be premised on existing evidence-based research; therefore, the present review ventures to report the most recent five-year trend of RTI in Uganda. Based on Preferred Reporting Items for Systematic Reviews and Meta-Data Analysis (PRISMA) guidelines, a systematic review was employed. Using a thematic analysis, the articles were grouped into: trauma etiology, trauma care, mortality, cost, trauma registry and communication, intervention and treatment for final analysis. Of the nineteen articles that were identified to be relevant to the study, the etiology of RTI was inevitably observed to be an important cause of injuries in Uganda. The risk factors cut across: the crash type, injury physiology, cause, victims, setting, age, economic status, and gender. All studies that were reviewed have advanced varying recommendations aimed at responding to the trend of RTIs in Uganda, of which some are in tandem with the five pillars of the United Nations Decade of Action for Road Safety 2011 - 2020. Peripheral measures of the burden of RTIs in Uganda were undertaken within afive-year timeframe (2011-2015) of implementing the United Nations Decade of Action for Road Safety. The measures however, ought to be scaled-up on robust evidence based research available from all the concerned stakeholders beyond Kampala or central region to other parts of Uganda. © 2017 KUMS, All rights reserved.
Road traffic incidents in Uganda: a systematic review of a five-year trend
Balikuddembe, Joseph Kimuli; Ardalan, Ali; Khorasani-Zavareh, Davoud; Nejati, Amir; Munanura, Kasiima Stephen
2017-01-01
Abstract: Background: Over the years, Uganda has been one of the low and middle-income countries bearing the heaviest burden of road traffic incidents (RTI). Since the proclamation of the United Nations Decade of Action for Road Safety 2011 – 2020, a number of measures have been taken to reduce the burden. However, they ought to be premised on existing evidence-based research; therefore, the present review ventures to report the most recent five-year trend of RTI in Uganda. Methods: Based on Preferred Reporting Items for Systematic Reviews and Meta-Data Analysis (PRISMA) guidelines, a systematic review was employed. Using a thematic analysis, the articles were grouped into: trauma etiology, trauma care, mortality, cost, trauma registry and communication, intervention and treatment for final analysis. Results: Of the nineteen articles that were identified to be relevant to the study, the etiology of RTI was inevitably observed to be an important cause of injuries in Uganda. The risk factors cut across: the crash type, injury physiology, cause, victims, setting, age, economic status, and gender. All studies that were reviewed have advanced varying recommendations aimed at responding to the trend of RTIs in Uganda, of which some are in tandem with the five pillars of the United Nations Decade of Action for Road Safety 2011 – 2020. Conclusions: Peripheral measures of the burden of RTIs in Uganda were undertaken within a five-year timeframe (2011-2015) of implementing the United Nations Decade of Action for Road Safety. The measures however, ought to be scaled-up on robust evidence based research available from all the concerned stakeholders beyond Kampala or central region to other parts of Uganda. PMID:28039687
ERIC Educational Resources Information Center
Donahoo, Saran
2008-01-01
Background/Context: Although frequently associated with the United States, affirmative action is not a uniquely American social policy. Indeed, 2003 witnessed review and revision of affirmative action policies affecting higher education institutions in both France and the United States. Using critical race theory (CRT) as a theoretical lens, this…
Code of Federal Regulations, 2010 CFR
2010-04-01
... 17 Commodity and Securities Exchanges 1 2010-04-01 2010-04-01 false Final decision. 8.28 Section 8.28 Commodity and Securities Exchanges COMMODITY FUTURES TRADING COMMISSION EXCHANGE PROCEDURES FOR DISCIPLINARY, SUMMARY, AND MEMBERSHIP DENIAL ACTIONS Summary Actions § 8.28 Final decision. Each exchange shall...
Interim Action Proposed Plan for the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bradley, J.
2002-06-18
The purpose of this Interim Action Proposed Plan (IAPP) is to describe the preferred interim remedial action for addressing the Chemicals, Metals, and Pesticides (CMP) Pits Operable Unit and to provide an opportunity for public input into the remedial action selection process.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 477, N-Tunnel Muckpile. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 477 is comprised of one Corrective Action Site (CAS): • 12-06-03, Muckpile The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure with no further action, by placing use restrictions on CAUmore » 477.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Kauss
2011-06-01
This Closure Report (CR) presents information supporting the closure of Corrective Action Unit (CAU) 539: Areas 25 and 26 Railroad Tracks, Nevada National Security Site, Nevada. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. The corrective action sites (CASs) within CAU 539 are located within Areas 25 and 26 of the Nevada National Security Site. Corrective Action Unit 539 comprises the following CASs: • 25-99-21, Area 25 Railroad Tracksmore » • 26-99-05, Area 26 Railroad Tracks The purpose of this CR is to provide documentation supporting the completed corrective actions and provide data confirming that the closure objectives for CASs within CAU 539 were met. To achieve this, the following actions were performed: • Reviewed documentation on historical and current site conditions, including the concentration and extent of contamination. • Conducted radiological walkover surveys of railroad tracks in both Areas 25 and 26. • Collected ballast and soil samples and calculated internal dose estimates for radiological releases. • Collected in situ thermoluminescent dosimeter measurements and calculated external dose estimates for radiological releases. • Removed lead bricks as potential source material (PSM) and collected verification samples. • Implemented corrective actions as necessary to protect human health and the environment. • Properly disposed of corrective action and investigation wastes. • Implemented an FFACO use restriction (UR) for radiological contamination at CAS 25-99-21. The approved UR form and map are provided in Appendix F and will be filed in the DOE, National Nuclear Security Administration Nevada Site Office (NNSA/NSO), Facility Information Management System; the FFACO database; and the NNSA/NSO CAU/CAS files. From November 29, 2010, through May 2, 2011, closure activities were performed as set forth in the Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Areas 25 and 26 Railroad Tracks, Nevada Test Site, Nevada. The purposes of the activities as defined during the data quality objectives process were as follows: • Determine whether contaminants of concern (COCs) are present. • If COCs are present, determine their nature and extent, implement appropriate corrective actions, and properly dispose of wastes. Analytes detected during the closure activities were evaluated against final action levels (FALs) to determine COCs for CAU 539. Assessment of the data generated from closure activities revealed the following: • At CAS 26-99-05, the total effective dose for radiological releases did not exceed the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at three locations. A corrective action of clean closure was implemented at these locations, and verification samples indicated that no further action is necessary. • At CAS 25-99-21, the total effective dose for radiological releases exceeds the FAL of 25 millirem per Industrial Area year. Potential source material in the form of lead bricks was found at eight locations. A corrective action was implemented by removing the lead bricks and soil above FALs at these locations, and verification samples indicated that no further action is necessary. Pieces of debris with high radioactivity were identified as PSM and remain within the CAS boundary. A corrective action of closure in place with a UR was implemented at this CAS because closure activities showed evidence of remaining soil contamination and radioactive PSM. Future land use will be restricted from surface and intrusive activities. Closure activities generated waste streams consisting of industrial solid waste, recyclable materials, low-level radioactive waste, and mixed low-level radioactive waste. Wastes were disposed of in the appropriate onsite landfills. The NNSA/NSO provides the following recommendations: • Clean closure is required at CAS 26-99-05. • Closure in place is required at CAS 25-99-21. • A UR is required at CAS 25-99-21. • A Notice of Completion to the NNSA/NSO is requested from the Nevada Division of Environmental Protection for closure of CAU 539. • Corrective Action Unit 539 should be moved from Appendix III to Appendix IV of the FFACO.« less
78 FR 23630 - Notice of Final Federal Agency Actions on State Highway 99 (Segment C) in Texas
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-19
...: Notice of Limitation on Claims for Judicial Review of Actions by FHWA and Other Federal Agencies. SUMMARY... public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-03
... Administration (FHWA), Department of Transportation (DOT). ACTION: Notice of limitations on claims for judicial... public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal agency actions on the highway project will be barred unless the claim is filed on or before...
75 FR 42 - Establishment of Class E Airspace; Spencer, WV
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-04
... Aviation Administration (FAA), DOT. ACTION: Direct final rule; confirmation of effective date. SUMMARY: This action confirms the effective date of a direct final rule published in the Federal Register that establishes Class E Airspace at Spencer, WV. This action enhances the safety and airspace management of Boggs...
76 FR 51462 - Notice of Final Federal Agency Actions on Proposed Highway in Utah
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-18
... DEPARTMENT OF TRANSPORTATION Federal Highway Administration Notice of Final Federal Agency Actions on Proposed Highway in Utah AGENCY: Federal Highway Administration (FHWA), USDOT. ACTION: Notice of... highway project, Tooele Midvalley Highway, from I-80 to State Route 36 Tooele County, State of Utah. Those...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 32 National Defense 5 2014-07-01 2014-07-01 false Staff action. 723.8 Section 723.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL BOARD FOR CORRECTION OF NAVAL RECORDS § 723.8 Staff action. (a) Transmittal of final decisions granting relief. (1) If the final...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 32 National Defense 5 2010-07-01 2010-07-01 false Staff action. 723.8 Section 723.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL BOARD FOR CORRECTION OF NAVAL RECORDS § 723.8 Staff action. (a) Transmittal of final decisions granting relief. (1) If the final...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 32 National Defense 5 2012-07-01 2012-07-01 false Staff action. 723.8 Section 723.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL BOARD FOR CORRECTION OF NAVAL RECORDS § 723.8 Staff action. (a) Transmittal of final decisions granting relief. (1) If the final...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 32 National Defense 5 2011-07-01 2011-07-01 false Staff action. 723.8 Section 723.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL BOARD FOR CORRECTION OF NAVAL RECORDS § 723.8 Staff action. (a) Transmittal of final decisions granting relief. (1) If the final...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 32 National Defense 5 2013-07-01 2013-07-01 false Staff action. 723.8 Section 723.8 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL BOARD FOR CORRECTION OF NAVAL RECORDS § 723.8 Staff action. (a) Transmittal of final decisions granting relief. (1) If the final...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-06-01
This Final Second Supplemental Environmental Impact Statement (SSEIS) to the Johnston Atoll Chemical Agent Disposal System (JACADS) Environmental Impact Statement (EIS) assesses the effects of receiving, storing, and ultimately destructing the United States stockpile of lethal unitary chemical munitions currently stored in the Federal Republic of Germany (FRG) (European stockpile) at the Army's JACADS facility located on Johnston Atoll in the Pacific Ocean. This Final SSEIS addresses the effects of the following proposed European stockpile activities: the transport of the European stockpile from the territorial limit to Johnston Island, the unloading of munitions from transportation ships, the on-island munitions transportmore » and handling, on-island munitions storage, the disposal of munitions in the JACADS facility, the disposal of incineration wastes, and alternatives to the proposed action. This document also updates information in the 1983 EIS and the 1988 SEIS, as appropriate. This volume contains reproduced letters from various agencies, reproduced written comments received from the public, and a transcript from the public meeting.« less
78 FR 30345 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-22
... seeking Commission review of final disciplinary actions against them taken by self-regulatory... information provided in the application filed pursuant to Rule 19d-3 to review final actions taken by SROs including: (1) Final disciplinary sanctions; (2) denial or conditioning of membership, participation or...
DOE Office of Scientific and Technical Information (OSTI.GOV)
G. B. Mitchem
2001-08-22
This annual progress and performance evaluation report discusses the groundwater remedial actions in the 100 Area, including the interim actions at the 100-HR-3 and 100-KR-4 Operable Units, and also discusses the expedited response action in the 100-NR-2 operable unit.
77 FR 60613 - National Energy Action Month, 2012
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-04
... National Energy Action Month, 2012 By the President of the United States of America A Proclamation A secure... sustainable, vibrant economy. We took bold action to double our use of renewable energy sources like solar... the laws of the United States, do hereby proclaim October 2012 as National Energy Action Month. I call...
40 CFR 304.40 - Effect and enforcement of final decision.
Code of Federal Regulations, 2011 CFR
2011-07-01
... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...
40 CFR 304.40 - Effect and enforcement of final decision.
Code of Federal Regulations, 2013 CFR
2013-07-01
... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...
40 CFR 304.40 - Effect and enforcement of final decision.
Code of Federal Regulations, 2012 CFR
2012-07-01
... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...
40 CFR 304.40 - Effect and enforcement of final decision.
Code of Federal Regulations, 2014 CFR
2014-07-01
... established by this part shall not be liable for claims for contributions regarding matters addressed by the... against an action seeking contribution for matters addressed by the final decision, no final decision..., regulation or legal theory; or (2) Take further response action at the facility concerned pursuant to CERCLA...
77 FR 61654 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-10
...This notice announces actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to the proposed State Route 11 and Otay Mesa East Land Port of Entry in the City and County of San Diego, State of California. These actions grant licenses, permits, and approvals for the project.
5 CFR 1201.126 - Final decisions.
Code of Federal Regulations, 2010 CFR
2010-01-01
... PROCEDURES Procedures for Original Jurisdiction Cases Special Counsel Disciplinary Actions § 1201.126 Final decisions. (a) In any action to discipline an employee, except as provided in paragraphs (b) or (c) of this... civil penalty not to exceed $1,100. 5 U.S.C. 1215(a)(3). (b) In any action in which the administrative...
Reframing school dropout as a public health issue.
Freudenberg, Nicholas; Ruglis, Jessica
2007-10-01
Good education predicts good health, and disparities in health and in educational achievement are closely linked. Despite these connections, public health professionals rarely make reducing the number of students who drop out of school a priority, although nearly one-third of all students in the United States and half of black, Latino, and American Indian students do not graduate from high school on time. In this article, we summarize knowledge on the health benefits of high school graduation and discuss the pathways by which graduating from high school contributes to good health. We examine strategies for reducing school dropout rates with a focus on interventions that improve school completion rates by improving students' health. Finally, we recommend actions health professionals can take to reframe the school dropout rate as a public health issue and to improve school completion rates in the United States.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alfred Wickline
Corrective Action Unit 563, Septic Systems, is located in Areas 3 and 12 of the Nevada Test Site, which is 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 563 is comprised of the four corrective action sites (CASs) below: • 03-04-02, Area 3 Subdock Septic Tank • 03-59-05, Area 3 Subdock Cesspool • 12-59-01, Drilling/Welding Shop Septic Tanks • 12-60-01, Drilling/Welding Shop Outfalls These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective actionmore » investigation (CAI) before evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-09-29
The Allied Chemical site is located in the City of Ironton, Lawrence County, Ohio. The remedial action addresses the Goldcamp Disposal Area (GDA) operable unit of the site. The GDA was a sand and gravel pit used for disposal of various chemical wastes from three sources between 1945 and 1977. In 1977, Allied decided to discontinue use of the GDA for disposal of chemical wastes. Allied and its contractor, in consultation with the Ohio Environmental Protection Agency (OEPA), completed a closure project at the site in August 1980, which involved removal of standing liquids and filling and capping the sitemore » with clay. Subsequent hydrogeologic and water-quality investigations indicated that there is ground-water contamination at the site which may pose a threat to public health through migration. The primary contaminants of concern affecting the soil and ground water are VOCs including benzene, other organics including phenols and PAHs, and inorganics including cyanide. The selected remedial action for the site is included.« less
Membrane estrogen receptors - is it an alternative way of estrogen action?
Soltysik, K; Czekaj, P
2013-04-01
The functions of estrogens are relatively well known, however the molecular mechanism of their action is not clear. The classical pathway of estrogen action is dependent on ERα and ERβ which act as transcription factors. The effects of this pathway occur within hours or days. In addition, so-called, non-classical mechanism of steroid action dependent on membrane estrogen receptors (mER) was described. In this mechanism the effects of estrogen action are observed in a much shorter time. Here we review the structure and cellular localization of mER, molecular basis of non-classical mER action, physiological role of mER as well as implications of mER action for cancer biology. Finally, some concerns about the new estrogen receptor - GPER and candidates for estrogen receptors - ER-X and ERx, are briefly discussed. It seems that mER is a complex containing signal proteins (signalosome), as IGF receptor, EGF receptor, Ras protein, adaptor protein Shc, non-receptor kinase c-Src and PI-3K, what rationalizes production of second messengers. Some features of membrane receptors are almost identical if compared to nuclear receptors. Probably, membrane and nuclear estrogen receptors are not separate units, but rather the components of a complex mechanism in which they both cooperate with each other. We conclude that the image of the estrogen receptor as a simple transcription factor is a far-reaching simplification. A better understanding of the mechanisms of estrogen action will help us to design more effective drugs affecting signal pathways depending on both membrane and nuclear receptors.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-10
... (FHWA), DOT. ACTION: Notice of Limitation on Claims for Judicial Review of Actions by the U.S. Army... notice, the FHWA is advising the public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim... claim is filed on or before October 7, 2013. If this date falls on a Saturday, Sunday, or legal holiday...
42 CFR 137.155 - What constitutes a final agency action?
Code of Federal Regulations, 2010 CFR
2010-10-01
... 42 Public Health 1 2010-10-01 2010-10-01 false What constitutes a final agency action? 137.155 Section 137.155 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Final Offer Decision Maker § 137...
42 CFR 137.155 - What constitutes a final agency action?
Code of Federal Regulations, 2011 CFR
2011-10-01
... 42 Public Health 1 2011-10-01 2011-10-01 false What constitutes a final agency action? 137.155 Section 137.155 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES INDIAN HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES TRIBAL SELF-GOVERNANCE Final Offer Decision Maker § 137...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2014 CFR
2014-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2010 CFR
2010-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2011 CFR
2011-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2012 CFR
2012-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
32 CFR 536.59 - Settlement or approval authority.
Code of Federal Regulations, 2013 CFR
2013-07-01
... empowered to settle, pay or compromise a claim in full or in part, provided the claimant agrees. “Final action authority” means the officer empowered to deny or make a final offer on a claim. Determining the proper officer empowered to approve or make final action on a claim depends on the claims statute...
10 CFR 51.92 - Supplement to the final environmental impact statement.
Code of Federal Regulations, 2011 CFR
2011-01-01
... changes in the proposed action that are relevant to environmental concerns; or (2) There are new and..., technical, and other benefits and costs of the proposed action, to the extent that the final environmental... costs; (5) Include an analysis of other energy alternatives, to the extent that the final environmental...
44 CFR 9.12 - Final public notice.
Code of Federal Regulations, 2011 CFR
2011-10-01
... good cause shown, be allowed for comment on the final notice. (c) For actions for which an... potential impact; and (6) Similarity of the actions, i.e., to the extent that they are susceptible of common...) After providing the final notice, the Agency shall, without good cause shown, wait at least 15 days...
44 CFR 9.12 - Final public notice.
Code of Federal Regulations, 2010 CFR
2010-10-01
... good cause shown, be allowed for comment on the final notice. (c) For actions for which an... potential impact; and (6) Similarity of the actions, i.e., to the extent that they are susceptible of common...) After providing the final notice, the Agency shall, without good cause shown, wait at least 15 days...
78 FR 15757 - Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-12
... disciplinary actions against them taken by self-regulatory organizations (``SROs'') for which the Commission is... filed pursuant to Rule 19d-3 to review final actions taken by SROs including: (1) Final disciplinary...
15 CFR 720.3 - Final decision on administrative action denying export privileges.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS DENIAL OF EXPORT PRIVILEGES § 720.3 Final decision on administrative action...
15 CFR 720.3 - Final decision on administrative action denying export privileges.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS DENIAL OF EXPORT PRIVILEGES § 720.3 Final decision on administrative action...
77 FR 54384 - Nonconformance Penalties for On-Highway Heavy-Duty Diesel Engines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-05
...EPA is taking final action to establish nonconformance penalties (NCPs) for manufacturers of heavy heavy-duty diesel engines (HHDDE) in model years 2012 and later for emissions of oxides of nitrogen (NOX) because we have found the criteria for NCPs and the Clean Air Act have been met. The NOX standards to which these NCPs apply were established by a rule published on January 18, 2001. In general, NCPs allow a manufacturer of heavy-duty engines (HDEs) whose engines do not conform to applicable emission standards, but do not exceed a designated upper limit, to be issued a certificate of conformity upon payment of a monetary penalty to the United States Government. The upper limit associated with these NCPs is 0.50 grams of NOX per brake horsepower-hour (g/bhp-hr). This Final Rule specifies certain parameters that are entered into the preexisting penalty formulas along with the emissions of the engine and the incorporation of other factors to determine the amount a manufacturer must pay. Key parameters that determine the NCP a manufacturer must pay are EPA's estimated cost of compliance for a near worst-case engine and the degree to which the engine exceeds the emission standard (as measured from production engines). EPA proposed NCPs for medium heavy duty diesel engines. However, EPA is not taking final action with regard to NCPs for these engines at this time because EPA has not completed its review of the data and comments regarding these engines.
NASA Astrophysics Data System (ADS)
Citraresmi, A. D. P.; Wahyuni, E. E.
2018-03-01
The aim of this study was to inspect the implementation of Hazard Analysis and Critical Control Point (HACCP) for identification and prevention of potential hazards in the production process of dried anchovy at PT. Kelola Mina Laut (KML), Lobuk unit, Sumenep. Cold storage process is needed in each anchovy processing step in order to maintain its physical and chemical condition. In addition, the implementation of quality assurance system should be undertaken to maintain product quality. The research was conducted using a survey method, by following the whole process of making anchovy from the receiving raw materials to the packaging of final product. The method of data analysis used was descriptive analysis method. Implementation of HACCP at PT. KML, Lobuk unit, Sumenep was conducted by applying Pre Requisite Programs (PRP) and preparation stage consisting of 5 initial stages and 7 principles of HACCP. The results showed that CCP was found in boiling process flow with significant hazard of Listeria monocytogenesis bacteria and final sorting process with significant hazard of foreign material contamination in the product. Actions taken were controlling boiling temperature of 100 – 105°C for 3 - 5 minutes and training for sorting process employees.
75 FR 8786 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-25
... (USFWS), DOI. SUMMARY: This notice announces actions taken by the FHWA and the USFWS that are final... (USFWS), DOI, was published in the Federal Register on April 17, 2007. A claim seeking judicial review of... Claims for Judicial Review of these actions and decisions by the USFWS, DOI, was published in the Federal...
76 FR 60583 - Notice of Final Federal Agency Actions on Proposed Highway in Indiana
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-29
... (USFWS), DOI. SUMMARY: This notice announces actions taken by the FHWA and the USFWS that are final... (USFWS), DOI, was published in the Federal Register on April 17, 2007. A claim seeking judicial review of... Claims for Judicial Review of these actions and decisions by the USFWS, DOI, was published in the Federal...
75 FR 6813 - Approval of Air Quality Implementation Plans; New Mexico; Albuquerque/Bernalillo County
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-11
...). ACTION: Direct final rule. SUMMARY: The EPA is approving revisions to the State Implementation Plan (SIP.... Background III. Summary of Changes to the New Mexico SIP IV. Final Action V. Statutory and Executive Order Reviews I. What Action Is EPA Taking? Today we are approving revisions to the New Mexico SIP, submitted by...
Code of Federal Regulations, 2010 CFR
2010-04-01
.../m), calculated on a dry basis. (2) The sulfated ash content is not more than 0.3 percent, m/m... action to final action. (3) Sulfated ash content, section 31.014, “Ash of Sugars and Sirups,” Final Action, Sulfated Ash, 14th Ed. (1984), p. 575. (4) pH, section 14.022, “pH of Flour, Potentiometric...
Code of Federal Regulations, 2011 CFR
2011-04-01
.../m), calculated on a dry basis. (2) The sulfated ash content is not more than 0.3 percent, m/m... action to final action. (3) Sulfated ash content, section 31.014, “Ash of Sugars and Sirups,” Final Action, Sulfated Ash, 14th Ed. (1984), p. 575. (4) pH, section 14.022, “pH of Flour, Potentiometric...
DOE Office of Scientific and Technical Information (OSTI.GOV)
David A. Strand
The Corrective Action Investigation Plan for Corrective Action Unit 219, Septic Systems and Injection Wells, has been developed in accordance with the ''Federal Facility Agreement and Consent Order'' (1996) that was agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. The purpose of the investigation is to ensure that adequate data are collected to provide sufficient and reliable information to identify, evaluate, and select technically viable corrective actions. Corrective Action Unit 219 is located in Areas 3, 16, and 23 of the Nevada Test Site, which is 65 miles northwest ofmore » Las Vegas, Nevada. Corrective Action Unit 219 is comprised of the six Corrective Action Sites (CASs) listed below: (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives. Additional information will be obtained by conducting a corrective action investigation prior to evaluating corrective action alternatives and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable corrective action alternatives that will be presented in the Corrective Action Decision Document.« less
2013 Cellulosic Biofuel Standard: Direct Final Rule
The direct final action is to revise the 2013 cellulosic biofuel standard. This action follows from EPA having granted API's and AFPM's petitions for reconsideration of the 2013 cellulosic biofuel standard published on August 15, 2013.
42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2010 CFR
2010-10-01
... HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for... Withdrawal of Approval of an Accreditation Body § 8.34 Court review of final administrative action...
42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2011 CFR
2011-10-01
... HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for... Withdrawal of Approval of an Accreditation Body § 8.34 Court review of final administrative action...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
CAU 573 comprises the following corrective action sites (CASs): • 05-23-02, GMX Alpha Contaminated Area • 05-45-01, Atmospheric Test Site - Hamilton These two CASs include the release at the Hamilton weapons-related tower test and a series of 29 atmospheric experiments conducted at GMX. The two CASs are located in two distinctly separate areas within Area 5. To facilitate site investigation and data quality objective (DQO) decisions, all identified releases (i.e., CAS components) were organized into study groups. The reporting of investigation results and the evaluation of DQO decisions are at the release level. The corrective action alternatives (CAAs) weremore » evaluated at the FFACO CAS level. The purpose of this CADD/CAP is to evaluate potential CAAs, provide the rationale for the selection of recommended CAAs, and provide the plan for implementation of the recommended CAA for CAU 573. Corrective action investigation (CAI) activities were performed from January 2015 through November 2015, as set forth in the CAU 573 Corrective Action Investigation Plan (CAIP). Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the contaminants of concern. Assessment of the data generated from investigation activities conducted at CAU 573 revealed the following: • Radiological contamination within CAU 573 does not exceed the FALs (based on the Occasional Use Area exposure scenario). • Chemical contamination within CAU 573 does not exceed the FALs. • Potential source material—including lead plates, lead bricks, and lead-shielded cables—was removed during the investigation and requires no additional corrective action.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 478, Area 12 T-Tunnel Ponds. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy (DOE), and the U.S. Department of Defense. Corrective Action Unit 478 is comprised of one corrective action site (CAS): • 12-23-01, Ponds (5) RAD Area The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with usemore » restrictions for CAU 478.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document (CADD)/Closure Report (CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 559, T-Tunnel Compressor/Blower Pad. This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the U.S. Department of Energy, and the U.S. Department of Defense. Corrective Action Unit 559 is comprised of one Corrective Action Site (CAS): • 12-25-13, Oil Stained Soil and Concrete The purpose of this CADD/CR is to provide justification and documentation supporting the recommendation for closure in place with use restrictionsmore » for CAU 559.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-18
..., corruption, and harm such actions cause in the United States and abroad. Because the actions of significant... economy of the United States and cause an extreme level of violence, corruption, and harm in the United...
75 FR 65052 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-21
... of Limitation on Claims for Judicial Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 327. SUMMARY: The FHWA, on behalf of Caltrans, is issuing this notice to announce actions taken by Caltrans and other Federal agencies that are final within the meaning of 23 U.S.C...
78 FR 13746 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2013-02-28
... public of final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the... of Limitation on Claims for Judicial Review of Actions by the California Department of Transportation (Caltrans), pursuant to 23 U.S.C. 327. SUMMARY: The FHWA, on behalf of Caltrans, is issuing this notice to...
75 FR 5168 - Notice of Final Federal Agency Action on Proposed Highway in Illinois
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-01
... limitation on claims for judicial review of actions by FHWA and other Federal agencies. SUMMARY: This notice... construction of an access-controlled, four-lane freeway on new right-of-way between the existing IL 6... final agency actions subject to 23 U.S.C. 139(l)(1). A claim seeking judicial review of the Federal...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
Corrective Action Unit 374 is located in Areas 18 and 20 of the Nevada Test Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 374 comprises the five corrective action sites (CASs) listed below: • 18-22-05, Drum • 18-22-06, Drums (20) • 18-22-08, Drum • 18-23-01, Danny Boy Contamination Area • 20-45-03, U-20u Crater (Schooner) These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAsmore » and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on October 20, 2009, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 374.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2014-01-01
The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that no further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
This Corrective Action Investigation Plan contains the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office's approach to collect the data necessary to evaluate corrective action alternatives (CAAs) appropriate for the closure of Corrective Action Unit (CAU) 536: Area 3 Release Site, Nevada Test Site, Nevada, under the Federal Facility Agreement and Consent Order. Corrective Action Unit 536 consists of a single Corrective Action Site (CAS): 03-44-02, Steam Jenny Discharge. The CAU 536 site is being investigated because existing information on the nature and extent of possible contamination is insufficient to evaluate and recommend corrective action alternatives formore » CAS 03-44-02. The additional information will be obtained by conducting a corrective action investigation (CAI) prior to evaluating CAAs and selecting the appropriate corrective action for this CAS. The results of this field investigation are to be used to support a defensible evaluation of corrective action alternatives in the corrective action decision document. Record of Technical Change No. 1 is dated 3-2004.« less
Federal Research Action Plan on Recycled Tire Crumb Used ...
Over the past several years, parents, athletes, schools, and communities have raised concerns about the safety of recycled tire crumb rubber used as infill for playing fields and playgrounds in the United States. The public has expressed concerns that the use of these fields could potentially be related to certain health effects. Studies to date have not shown an elevated health risk from playing on fields with tire crumb rubber, but these studies have limitations and do not comprehensively evaluate the concerns about health risks from exposure to tire crumb rubber. This status report provides a summary of activities to date, including: (1) stakeholder outreach, (2) the tire crumb rubber manufacturing industry, (3) the final peer-reviewed Literature Review/Gaps Analysis (LRGA), (4) progress on the research activities, and (5) next steps and a timeline for completion of the final report. The status report does not include research findings.
Johnston Atoll Chemical Agent Disposal System (JACADS)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1990-06-01
This Final Second Supplemental Environmental Impact Statement (SSEIS) to the Johnston Atoll Chemical Agent Disposal System (JACADS) Environmental Impact Statement (EIS) assesses the effects of receiving, storing, and ultimately destructing the United States stockpile of lethal unitary chemical munitions currently stored in the Federal Republic of Germany (FRG) (European stockpile) at the Army's JACADS facility located on Johnston Atoll in the Pacific Ocean. This Final SSEIS addresses the effects of the following proposed European stockpile activities: the transport of the European stockpile from the territorial limit to Johnston Island, the unloading of munitions from transportation ships, the on-island munitions transportmore » and handling, on-island munitions storage, the disposal of munitions in the JACADS facility, the disposal of incineration wastes, and alternatives to the proposed action. This document also updates information in the 1983 EIS and the 1988 SEIS, as appropriate. 46 refs., 10 figs., 9 tabs.« less
[Spatial imprinting influence on development of cognitive process in adult animals].
Serkova, V V; Nikol'skaia, K A
2013-12-01
The influence of spatial imprinting on cognitive activity of adult mice F1 from DBA/2J C57BL/6J in a transformable multialternative maze has been studied. A control mice initially learned in a maze with "direct" and "bypass" pathway between feeders. They successfully formed a food-getting habit after 9-10 sessions using mainly direct pathway, so the final route decision was consistent with the principle of least action. Experimental mice previously placed into reduced maze with only "bypass" pathway between feeders for 1-2 trials (1-3 min), and turn up in the complete maze immediately after that. Experimental mice could not organize a food-getting behavior according a task conditions since attempted to include in final decision both "direct" and "bypass" pathways, united in a single ring-like construction. They demonstrated situational behavior running from one feeder to another one, despite of fact that therein had no feed. So it opposed the realization of least action principle, becoming a source of psycho-emotional stress. The results showed that spatial information perceiving in the first few minutes of exploring the experimental environment can manifest itself as the acquired preference and come in conflict with an instinctive one. Cognitive dissonance predetermined the direction of the cognitive process.
ERIC Educational Resources Information Center
Blum, Robert E.; Raymond, Carolyn D.
One of five McDonald's Action Packs, these instructional materials for ninth and tenth graders (and more able sixth and seventh graders) have incorporated ideas around three career development goals--subject relevance, career awareness, and self-awareness. The action pack contains six units--three units each in the subject areas of language arts…
40 CFR 264.101 - Corrective action for solid waste management units.
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 26 2011-07-01 2011-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Releases From Solid Waste Management Units § 264.101 Corrective action for...
40 CFR 264.101 - Corrective action for solid waste management units.
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 25 2010-07-01 2010-07-01 false Corrective action for solid waste... (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE TREATMENT, STORAGE, AND DISPOSAL FACILITIES Releases From Solid Waste Management Units § 264.101 Corrective action for...
DOE Office of Scientific and Technical Information (OSTI.GOV)
David Strand
2006-05-01
This Corrective Action Decision Document/Closure Report has been prepared for Corrective Action Unit (CAU) 219, Septic Systems and Injection Wells, in Areas 3, 16, and 23 of the Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 219 is comprised of the following corrective action sites (CASs): (1) 03-11-01, Steam Pipes and Asbestos Tiles; (2) 16-04-01, Septic Tanks (3); (3) 16-04-02, Distribution Box; (4) 16-04-03, Sewer Pipes; (5) 23-20-01, DNA Motor Pool Sewage and Waste System; and (6) 23-20-02, Injection Well. The purpose of this Corrective Action Decision Document/Closure Report ismore » to provide justification and documentation supporting the recommendation for closure of CAU 219 with no further corrective action beyond the application of a use restriction at CASs 16-04-01, 16-04-02, and 16-04-03. To achieve this, corrective action investigation (CAI) activities were performed from June 20 through October 12, 2005, as set forth in the CAU 219 Corrective Action Investigation Plan and Record of Technical Change No. 1. A best management practice was implemented at CASs 16-04-01, 16-04-02, and 16-04-03, and corrective action was performed at CAS 23-20-01 between January and April 2006. In addition, a use restriction will be applied to CASs 16-04-01, 16-04-02, and 16-04-03 to provide additional protection to Nevada Test Site personnel. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: (1) Determine whether contaminants of concern (COCs) are present. (2) If COCs are present, determine their nature and extent. (3) Provide sufficient information and data to complete appropriate corrective actions. The CAU 219 dataset from the investigation results was evaluated based on the data quality indicator parameters. This evaluation demonstrated the quality and acceptability of the dataset for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against final action levels (FALs) established in this document. A Tier 2 evaluation was conducted, and a FAL of 185,000 micrograms per kilogram was calculated for chlordane at CASs 16-04-01, 16-04-02, and 16-04-03 based on an occasional use area exposure scenario. This evaluation of chlordane based on the Tier 2 FAL determined that no FALs were exceeded. Therefore, the DQO data needs were met, and it was determined that no corrective action (based on risk to human receptors) is necessary for the site. The following contaminants were determined to be present at concentrations exceeding their corresponding FALs: (1) The surface soil surrounding the main concrete pad at CAS 23-20-01 contained Aroclor-1254, Aroclor-1260, and chlordane above the FALs. This soil, along with the COCs, was subsequently removed at CAS 23-20-01. (2) The sludge in the concrete box of the catch basin at the large concrete pad at CAS 23-20-01 contained lead and benzo(a)pyrene above the FALs. This contamination was limited to the sludge in the concrete box of the catch basin and did not migrate to the subsurface features beneath it. The contaminated and the concrete box of the catch basin were subsequently recovered at CAS 23-20-01.« less
Additional Technologies and Investigations for Provision of Future Aeronautical Communications
NASA Technical Reports Server (NTRS)
Gilbert, Tricia; Jin, Jenny; Berger, Jason; Henriksen, Steve
2008-01-01
The following NASA Contractor Report documents the in-depth studies on select technologies that could support long-term aeronautical mobile communications operating concepts. This work was performed during the third and final phase of NASA s Technology Assessment for the Federal Aviation Administration (FAA)/EUROCONTROL Future Communications Study (FCS) under a multiyear NASA contract. It includes the associated findings of ITT Corporation and NASA Glenn Research Center to the FAA as of the end of May 2007. The activities documented in this report focus on three final technology candidates identified by the United States, and were completed before sufficient information about two additional technology candidates proposed by EUROCONTROL was made available. A separate report to be published by NASA/CR-2008-215144, entitled Final Report on Technology Investigations for Provision of Future Aeronautical Communications will include an assessment of all five final candidate technologies considered by the U.S. agencies (FAA and NASA) and EUROCONTROL. It will also provide an overview of the entire technology assessment process, including final recommendations. All three phases of this work were performed in compliance with the Terms of Reference for the Action Plan number 17 (AP-17) cooperative research agreement among EUROCONTROL, FAA, and NASA along with the general guidance of the FAA and EUROCONTROL available throughout this study.
The Origins of the Golden Hour of Medical Care and Its Applicability to Combat Medicine
2015-06-12
Joint Publication (United States Department of Defense) KIA Killed In Action MASH Mobile Army Surgical Hospital MAST Military Assistance to Safety...evacuation time as defined above is synonymous with “the Golden Hour” time frame. Killed in Action, ( KIA ), and Died of Wounds, (DOW): Killed in action...vehicle accidents alone within the continental United States than the entire number of United States KIA in eleven years of conflict in the Vietnam War
Wildlife management by habitat units: A preliminary plan of action
NASA Technical Reports Server (NTRS)
Frentress, C. D.; Frye, R. G.
1975-01-01
Procedures for yielding vegetation type maps were developed using LANDSAT data and a computer assisted classification analysis (LARSYS) to assist in managing populations of wildlife species by defined area units. Ground cover in Travis County, Texas was classified on two occasions using a modified version of the unsupervised approach to classification. The first classification produced a total of 17 classes. Examination revealed that further grouping was justified. A second analysis produced 10 classes which were displayed on printouts which were later color-coded. The final classification was 82 percent accurate. While the classification map appeared to satisfactorily depict the existing vegetation, two classes were determined to contain significant error. The major sources of error could have been eliminated by stratifying cluster sites more closely among previously mapped soil associations that are identified with particular plant associations and by precisely defining class nomenclature using established criteria early in the analysis.
2016-12-02
This action amends the rule to create a regulatory exception that allows children of same-sex domestic partners living overseas to maintain their Federal Employees Health Benefits (FEHB) and Federal Employees Dental and Vision Program (FEDVIP) coverage until September 30, 2018. Due to a recent Supreme Court decision, as of January 1, 2016, coverage of children of same-sex domestic partners under the FEHB Program and FEDVIP will generally only be allowed if the couple is married, as discussed in Benefits Administration Letter (BAL) 15-207 dated October 5, 2015. OPM recognizes there are additional requirements placed on overseas federal employees that may not apply to other civilian employees with duty stations in the United States making it difficult to travel to the United States to marry same-sex partners.
75 FR 78340 - Notice of Final Federal Agency Actions on Proposed Highway in Nevada
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-15
... the FHWA that are final within the meaning of 23 U.S.C. 139(l)(1). The actions relate to I-15 Corridor... NEON, in Clark County in the State of Nevada. Those actions grant licenses, permits, and approvals for...; telephone: (775) 888-7686; e-mail: [email protected]state.nv.us . The NDOT office's regular business hours are 8 a...
Marine Pharmacology in 2005-6: Antitumour and Cytotoxic Compounds
Mayer, Alejandro M.S.; Gustafson, Kirk R.
2009-01-01
During 2005 and 2006, marine pharmacology research directed towards the discovery and development of novel antitumour agents was reported in 171 peer-reviewed articles. The purpose of this article is to present a structured review of the antitumour and cytotoxic properties of 136 marine natural products, many of which are novel compounds that belong to diverse structural classes, including polyketides, terpenes, steroids, and peptides. The organisms yielding these bioactive marine compounds included invertebrate animals, algae, fungi and bacteria. Antitumour pharmacological studies were conducted with 42 structurally defined marine natural products in a number of experimental and clinical models which further defined their mechanisms of action. Particularly potent in vitro cytotoxicity data generated with murine and human tumour cell lines was reported for 94 novel marine chemicals with as yet undetermined mechanisms of action. Noteworthy is the fact that marine anticancer research was sustained by a global collaborative effort, involving researchers from Australia, Belgium, Benin, Brazil, Canada, China, Egypt, France, Germany, India, Indonesia, Italy, Japan, Mexico, the Netherlands, New Zealand, Panama, the Philippines, Slovenia, South Korea, Spain, Sweden, Taiwan, Thailand, United Kingdom, and the United States. Finally, this 2005-6 overview of the marine pharmacology literature highlights the fact that the discovery of novel marine antitumour agents continued at the same active pace as during 1998-2004. PMID:18701274
The importance of biological surveys in managing public lands in the western United States
Bogan, Michael A.; Finley, R.B.; Petersburg, S.J.
1988-01-01
Despite previous studies, incomplete knowledge of the mammalian fauna of many national parks hinders our ability to understand the consequences of either management actions of natural disasters to such preserves. Faunal losses have occurred and can be expected to continue (Newmark 1986a, 1986b). our studies in and near Dinosaur National Monument, one of the parks studied by Newmark (1986a, 1986b), have added 11 species to the known fauna. Some species have increased with human impact; other species have either disappeared or are declining. Finally, many species, which are uncommon and poorly known, may have rather specific habitat needs.
The politics of obesity: seven steps to government action.
Kersh, Rogan; Morone, James
2002-01-01
Concern is rapidly growing about obesity rates in the United States. This paper analyzes the political consequences. Despite myths about individualism and self-reliance, the U.S. government has a long tradition of regulating ostensibly private behavior. We draw on the historical experience in four other private realms (alcohol, illegal drugs, tobacco, and sexuality) to identify seven "triggers" that prompt government to intervene in citizens' private habits. We suggest which of those triggers have been tripped--or are in play--in the case of obesity and food consumption. Finally, we review what government now does in this field and what it might do in the future.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mark Krause
2010-08-01
This Corrective Action Decision Document (CADD) presents information supporting the selection of corrective action alternatives (CAAs) leading to the closure of Corrective Action Unit (CAU) 562, Waste Systems, in Areas 2, 23, and 25 of the Nevada Test Site, Nevada. This complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) that was agreed to by the State of Nevada; U.S. Department of Energy (DOE), Environmental Management; U.S. Department of Defense; and DOE, Legacy Management. Corrective Action Unit 562 comprises the following corrective action sites (CASs): • 02-26-11, Lead Shot • 02-44-02, Paint Spills and French Drainmore » • 02-59-01, Septic System • 02-60-01, Concrete Drain • 02-60-02, French Drain • 02-60-03, Steam Cleaning Drain • 02-60-04, French Drain • 02-60-05, French Drain • 02-60-06, French Drain • 02-60-07, French Drain • 23-60-01, Mud Trap Drain and Outfall • 23-99-06, Grease Trap • 25-60-04, Building 3123 Outfalls The purpose of this CADD is to identify and provide the rationale for the recommendation of CAAs for the 13 CASs within CAU 562. Corrective action investigation (CAI) activities were performed from July 27, 2009, through May 12, 2010, as set forth in the CAU 562 Corrective Action Investigation Plan. The purpose of the CAI was to fulfill the following data needs as defined during the data quality objective (DQO) process: • Determine whether COCs are present. • If COCs are present, determine their nature and extent. • Provide sufficient information and data to complete appropriate corrective actions. A data quality assessment (DQA) performed on the CAU 562 data demonstrated the quality and acceptability of the data for use in fulfilling the DQO data needs. Analytes detected during the CAI were evaluated against appropriate final action levels (FALs) to identify the COCs for each CAS. The results of the CAI identified COCs at 10 of the 13 CASs in CAU 562, and thus corrective action is required. Assessment of the data generated from investigation activities conducted at CAU 562 is shown in Table ES-1. Based on the evaluation of analytical data from the CAI, review of future and current operations at the 13 CASs, and the detailed and comparative analysis of the potential CAAs, the following corrective actions are recommended for CAU 562. • No further action is the preferred corrective action for CASs 02-60-01, 02-60-06, and 02-60-07. • Clean closure is the preferred corrective action for CASs 02-26-11, 02-44-02, 02-59-01, 02-60-02, 02-60-03, 02-60-04, 02-60-05, 23-60-01, 23-99-06, and 25-60-04. The preferred CAAs were evaluated on technical merit focusing on performance, reliability, feasibility, safety, and cost. The alternatives were judged to meet all requirements for the technical components evaluated. The alternatives meet all applicable federal and state regulations for closure of the site and will reduce potential exposures to contaminated media to acceptable levels. The DOE, National Nuclear Security Administration Nevada Site Office provides the following recommendations: • No further corrective action is required at CASs 02-60-01, 02-60-06, and 02-60-07. • Clean closure is recommended for the remaining 10 CASs in CAU 562. • A Corrective Action Plan will be submitted to the Nevada Division of Environmental Protection that contains a detailed description of the proposed actions that will be taken to implement the selected corrective actions.« less
Krasovskiy, G N; Rakhmanin, Yu; Egorova, N
2015-01-01
The present study is devoted to theoretical questions of optimization of integrated assessment of the composition and properties of drinking water with the use of the Water Quality Index (WQI) and considering in it all 4 criteria for its hygienic quality-sanitary-toxicological, microbiological, radiation and organoleptic. There is presented a sequence of the analysis of benchmark data of the laboratory study of drinking water, including the selection of priority indices, their distribution into 4 groups according to hygienic criteria, calculations the ratios of real values (C) of indices to their hygiene MPC and the final calculation of the WQI. There is emphasized the importance of classes of hazard of substances, and the need for the special attention to the substances-carcinogens in the integrated assessment of water quality. To overcome the non-equivalence of contributions to the assessment of water quality factors, measured in different units, often disparated in their effect on human health, there are used the principles of combined action at levels below the MCL:C/MPC indices of performance of the unidirectional action are summed (e.g. carcinogenic substances), from indices of the independent action there are selected the most significant ones with the highest values of C/MPC, besides that there are also used counterbalancing factors K determined accordingly to Delphi method, with a maximum values of 5 for carcinogens and the minimum value of 1 for the substances affecting the organoleptic properties ofwater. There is presented the scheme of the final calculation of the value of WQI.
Improving the treatment planning and delivery process of Xoft electronic skin brachytherapy.
Manger, Ryan; Rahn, Douglas; Hoisak, Jeremy; Dragojević, Irena
2018-05-14
To develop an improved Xoft electronic skin brachytherapy process and identify areas of further improvement. A multidisciplinary team conducted a failure modes and effects analysis (FMEA) by developing a process map and a corresponding list of failure modes. The failure modes were scored for their occurrence, severity, and detectability, and a risk priority number (RPN) was calculated for each failure mode as the product of occurrence, severity, and detectability. Corrective actions were implemented to address the higher risk failure modes, and a revised process was generated. The RPNs of the failure modes were compared between the initial process and final process to assess the perceived benefits of the corrective actions. The final treatment process consists of 100 steps and 114 failure modes. The FMEA took approximately 20 person-hours (one physician, three physicists, and two therapists) to complete. The 10 most dangerous failure modes had RPNs ranging from 336 to 630. Corrective actions were effective at addressing most failure modes (10 riskiest RPNs ranging from 189 to 310), yet the RPNs were higher than those published for alternative systems. Many of these high-risk failure modes remained due to hardware design limitations. FMEA helps guide process improvement efforts by emphasizing the riskiest steps. Significant risks are apparent when using a Xoft treatment unit for skin brachytherapy due to hardware limitations such as the lack of several interlocks, a short source lifespan, and variability in source output. The process presented in this article is expected to reduce but not eliminate these risks. Copyright © 2018 American Brachytherapy Society. Published by Elsevier Inc. All rights reserved.
Final Tier 2 Environmental Impact Statement for International Space Station
NASA Technical Reports Server (NTRS)
1996-01-01
The Final Tier 2 Environmental Impact Statement (EIS) for the International Space Station (ISS) has been prepared by the National Aeronautics and Space Administration (NASA) and follows NASA's Record of Decision on the Final Tier 1 EIS for the Space Station Freedom. The Tier 2 EIS provides an updated evaluation of the environmental impacts associated with the alternatives considered: the Proposed Action and the No-Action alternative. The Proposed Action is to continue U.S. participation in the assembly and operation of ISS. The No-Action alternative would cancel NASA!s participation in the Space Station Program. ISS is an international cooperative venture between NASA, the Canadian Space Agency, the European Space Agency, the Science and Technology Agency of Japan, the Russian Space Agency, and the Italian Space Agency. The purpose of the NASA action would be to further develop human presence in space; to meet scientific, technological, and commercial research needs; and to foster international cooperation.
76 FR 37392 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-27
... which such actions were taken, are described in the Final Environmental Assessment (FEA) and Finding of No Significant Impact (FONSI) for the project, both approved on May 26, 2011. The FEA can be viewed...
77 FR 66875 - Brunswick Steam Electric Plant, Units 1 and 2
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-07
... NUCLEAR REGULATORY COMMISSION [Docket Nos. 50-325 and 50-324; NRC-2012-0269] Brunswick Steam Electric Plant, Units 1 and 2 AGENCY: Nuclear Regulatory Commission. ACTION: Receipt of request for action... Electric Plant, Units 1 and 2 (Brunswick). The petition is included in the SUPPLEMENTARY INFORMATION...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-11
...The Office of the Comptroller of the Currency (OCC) and Board of Governors of the Federal Reserve System (Board), are adopting a final rule that revises their risk-based and leverage capital requirements for banking organizations. The final rule consolidates three separate notices of proposed rulemaking that the OCC, Board, and FDIC published in the Federal Register on August 30, 2012, with selected changes. The final rule implements a revised definition of regulatory capital, a new common equity tier 1 minimum capital requirement, a higher minimum tier 1 capital requirement, and, for banking organizations subject to the advanced approaches risk-based capital rules, a supplementary leverage ratio that incorporates a broader set of exposures in the denominator. The final rule incorporates these new requirements into the agencies' prompt corrective action (PCA) framework. In addition, the final rule establishes limits on a banking organization's capital distributions and certain discretionary bonus payments if the banking organization does not hold a specified amount of common equity tier 1 capital in addition to the amount necessary to meet its minimum risk-based capital requirements. Further, the final rule amends the methodologies for determining risk-weighted assets for all banking organizations, and introduces disclosure requirements that would apply to top-tier banking organizations domiciled in the United States with $50 billion or more in total assets. The final rule also adopts changes to the agencies' regulatory capital requirements that meet the requirements of section 171 and section 939A of the Dodd-Frank Wall Street Reform and Consumer Protection Act. The final rule also codifies the agencies' regulatory capital rules, which have previously resided in various appendices to their respective regulations, into a harmonized integrated regulatory framework. In addition, the OCC is amending the market risk capital rule (market risk rule) to apply to Federal savings associations, and the Board is amending the advanced approaches and market risk rules to apply to top-tier savings and loan holding companies domiciled in the United States, except for certain savings and loan holding companies that are substantially engaged in insurance underwriting or commercial activities, as described in this preamble.
DOE Office of Scientific and Technical Information (OSTI.GOV)
David A. Strand
2005-05-01
This Corrective Action Decision Document has been prepared for Corrective Action Unit (CAU) 224, Decon Pad and Septic Systems, in Areas 2, 3, 5, 6, 11, and 23 of the Nevada Test Site, Nevada, in accordance with the ''Federal Facility Agreement and Consent Order'' (1996). Corrective Action Unit 224 is comprised of the following corrective action sites (CASs): (1) 02-04-01, Septic Tank (Buried); (2) 03-05-01, Leachfield; (3) 05-04-01, Septic Tanks (4)/Discharge Area; (4) 06-03-01, Sewage Lagoons (3); (5) 06-05-01, Leachfield; (6) 06-17-04, Decon Pad and Wastewater Catch; (7) 06-23-01, Decon Pad Discharge Piping; (8) 11-04-01, Sewage Lagoon; and (9) 23-05-02,more » Leachfield. The purpose of this Corrective Action Decision Document is to identify and provide the rationale for the recommendation of a corrective action alternative for the nine CASs within CAU 224. Corrective action investigation activities were performed from August 10, 2004, through January 18, 2005, as set forth in the CAU 224 Corrective Action Investigation Plan.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-25
... TENNESSEE VALLEY AUTHORITY Final Supplemental Environmental Impact Statement, Single Nuclear Unit... Environmental Impact Statement for a Single Nuclear Unit at the Bellefonte Plant Site (final SEIS) on September... the ROD. TVA prepared the final SEIS to update the extensive environmental information and analyses...
DOE Office of Scientific and Technical Information (OSTI.GOV)
ITLV.
1998-06-01
This Corrective Action Decision Document has been prepared for the Area 3 Septic Waste Systems 2 and 6 (Corrective Action Unit 427) in accordance with the Federal Facility Agreement and Consent Order of 1996 (FFACO, 1996). Corrective Action Unit 427 is located at the Tonopah Test Range, Nevada, and is comprised of the following Corrective Action Sites, each an individual septic waste system (DOE/NV, 1996a): Septic Waste System 2 is Corrective Action Site Number 03-05-002-SW02. Septic Waste System 6 is Corrective Action Site Number 03-05-002-SW06. The purpose of this Corrective Action Decision Document is to identify and provide a rationalemore » for the selection of a recommended corrective action alternative for each Corrective Action Site. The scope of this Correction Action Decision Document consists of the following tasks: Develop corrective action objectives. Identify corrective action alternative screening criteria. Develop corrective action alternatives. Perform detailed and comparative evaluations of the corrective action alternatives in relation to the corrective action objectives and screening criteria. Recommend and justify a preferred corrective action alternative for each CAS. From November 1997 through January 1998, a corrective action investigation was performed as set forth in the Corrective Action Investigation Plan for Corrective Action Unit No. 427: Area 3 Septic Waste System Numbers 2 and 6, Tonopah Test Range, Nevada (DOE/NV, 1997b). Details can be found in Appendix A of this document. The results indicated that contamination is present in some portions of the CAU and not in others as described in Table ES-1 and shown in Figure A.2-2 of Appendix A. Based on the potential exposure pathways, the following corrective action objectives have been identified for Corrective Action Unit 427: Prevent or mitigate human exposure to subsurface soils containing TPH at concentrations greater than 100 milligrams per kilogram (NAC, 1996b). Close Septic Tank 33-5 in accordance with Nevada Administrative Code 459 (NAC, 1996c). Prevent adverse impacts to groundwater quality. Based on the review of existing data, future land use, and current operations at the Tonopah Test Range, the following alternatives were developed for consideration at the Area 3 Septic Waste Systems 2 and 6: Alternative 1 - No Further Action Alternative 2 - Closure of Septic Tank 33-5 and Administrative Controls Alternative 3 - Closure of Septic Tank 33-5, Excavation, and Disposal The corrective action alternatives were evaluated based on four general corrective action standards and five remedy selection decision factors. Based on the results of this evaluation, the preferred alternative for Corrective Action Unit 427 is Alternative 2, Closure of Septic Tank 33-5 and Administrative Controls. The preferred corrective action alternative was evaluated on technical merit, focusing on performance, reliability, feasibility, and safety. The alternative was judged to meet all requirements for the technical components evaluated. The alternative meets all applicable state and federal regulations for closure of the site and will reduce potential future exposure pathways to the contaminated soils. During corrective action implementation, this alternative will present minimal potential threat to site workers who come in contact with the waste. However, procedures will be developed and implemented to ensure worker health and safety.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews
2011-07-01
Corrective Action Unit 106 comprises the four corrective action sites (CASs) listed below: • 05-20-02, Evaporation Pond • 05-23-05, Atmospheric Test Site - Able • 05-45-04, 306 GZ Rad Contaminated Area • 05-45-05, 307 GZ Rad Contaminated Area These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each CAS. The results of the field investigation will support a defensible evaluation of viablemore » CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the data quality objectives (DQOs) developed on January 19, 2010, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 106. The presence and nature of contamination at CAU 106 will be evaluated based on information collected from a field investigation. The CAU includes land areas impacted by the release of radionuclides from groundwater pumping during the Radionuclide Migration study program (CAS 05-20-02), a weapons-related airdrop test (CAS 05-23-05), and unknown support activities at two sites (CAS 05-45-04 and CAS 05-45-05). The presence and nature of contamination from surface-deposited radiological contamination from CAS 05-23-05, Atmospheric Test Site - Able, and other types of releases (such as migration and excavation as well as any potential releases discovered during the investigation) from the remaining three CASs will be evaluated using soil samples collected from the locations most likely containing contamination, if present. Appendix A provides a detailed discussion of the DQO methodology and the DQOs specific to each CAS. The scope of the corrective action investigation for CAU 106 includes the following activities: • Conduct radiological surveys. • Collect and submit environmental samples for laboratory analysis to determine internal dose rates and the presence of contaminants of concern. • If contaminants of concern are present, collect additional samples to define the extent of the contamination and determine the area where the total effective dose at the site exceeds final action levels (i.e., corrective action boundary). • Collect samples of investigation-derived waste, as needed, for waste management purposes.« less
Dynamic action units slip in speech production errors ☆
Goldstein, Louis; Pouplier, Marianne; Chen, Larissa; Saltzman, Elliot; Byrd, Dani
2008-01-01
In the past, the nature of the compositional units proposed for spoken language has largely diverged from the types of control units pursued in the domains of other skilled motor tasks. A classic source of evidence as to the units structuring speech has been patterns observed in speech errors – “slips of the tongue”. The present study reports, for the first time, on kinematic data from tongue and lip movements during speech errors elicited in the laboratory using a repetition task. Our data are consistent with the hypothesis that speech production results from the assembly of dynamically defined action units – gestures – in a linguistically structured environment. The experimental results support both the presence of gestural units and the dynamical properties of these units and their coordination. This study of speech articulation shows that it is possible to develop a principled account of spoken language within a more general theory of action. PMID:16822494
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This decision document presents the selected remedial action for Operable Unit Two for the Texarkana Wood Preserving Company (TWPC) Superfund Site (Site) in Texarkana, Texas. This operable unit is the second of two operable units planned for the Site. Operable Unit Two involves remediation of the deeper ground water contaminated above the action levels in a limited area of the Silty Sand Zone around Monitoring Well-16.
29 CFR 1990.147 - Final action.
Code of Federal Regulations, 2014 CFR
2014-07-01
...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If the...
29 CFR 1990.147 - Final action.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If the...
29 CFR 1990.147 - Final action.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If the...
29 CFR 1990.147 - Final action.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) IDENTIFICATION, CLASSIFICATION, AND REGULATION OF POTENTIAL OCCUPATIONAL CARCINOGENS Regulation of Potential Occupational Carcinogens § 1990.147 Final action. (a) Within one hundred twenty (120) days from the last day of... is classified as a Category I Potential Carcinogen or as a Category II Potential Carcinogen. If the...
Rep. Grijalva, Raul M. [D-AZ-7
2011-02-09
02/10/2011 For Further Action See S.188. (All Actions) Notes: For further action, see S.188, which became Public Law 112-2 on 2/17/2011. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
40 CFR 267.101 - What must I do to address corrective action for solid waste management units?
Code of Federal Regulations, 2012 CFR
2012-07-01
... action for solid waste management units? 267.101 Section 267.101 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Releases from Solid Waste Management Units § 267.101 What...
40 CFR 267.101 - What must I do to address corrective action for solid waste management units?
Code of Federal Regulations, 2014 CFR
2014-07-01
... action for solid waste management units? 267.101 Section 267.101 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Releases from Solid Waste Management Units § 267.101 What...
40 CFR 267.101 - What must I do to address corrective action for solid waste management units?
Code of Federal Regulations, 2013 CFR
2013-07-01
... action for solid waste management units? 267.101 Section 267.101 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Releases from Solid Waste Management Units § 267.101 What...
40 CFR 267.101 - What must I do to address corrective action for solid waste management units?
Code of Federal Regulations, 2011 CFR
2011-07-01
... action for solid waste management units? 267.101 Section 267.101 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Releases from Solid Waste Management Units § 267.101 What...
40 CFR 267.101 - What must I do to address corrective action for solid waste management units?
Code of Federal Regulations, 2010 CFR
2010-07-01
... action for solid waste management units? 267.101 Section 267.101 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY (CONTINUED) SOLID WASTES (CONTINUED) STANDARDS FOR OWNERS AND OPERATORS OF HAZARDOUS WASTE FACILITIES OPERATING UNDER A STANDARDIZED PERMIT Releases from Solid Waste Management Units § 267.101 What...
77 FR 40812 - Dicloran and Formetanate; Tolerance Actions
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-11
... Dicloran and Formetanate; Tolerance Actions AGENCY: Environmental Protection Agency (EPA). ACTION: Final... I.C. of the SUPPLEMENTARY INFORMATION). ADDRESSES: The docket for this action, identified by [email protected] . SUPPLEMENTARY INFORMATION: I. General Information A. Does this action apply to me? You may...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Matthews, Patrick
2013-09-01
This Corrective Action Decision Document/Closure Report presents information supporting the closure of Corrective Action Unit (CAU) 105: Area 2 Yucca Flat Atmospheric Test Sites, Nevada National Security Site, Nevada. CAU 105 comprises the following five corrective action sites (CASs): -02-23-04 Atmospheric Test Site - Whitney Closure In Place -02-23-05 Atmospheric Test Site T-2A Closure In Place -02-23-06 Atmospheric Test Site T-2B Clean Closure -02-23-08 Atmospheric Test Site T-2 Closure In Place -02-23-09 Atmospheric Test Site - Turk Closure In Place The purpose of this Corrective Action Decision Document/Closure Report is to provide justification and documentation supporting the recommendation that nomore » further corrective action is needed for CAU 105 based on the implementation of the corrective actions. Corrective action investigation (CAI) activities were performed from October 22, 2012, through May 23, 2013, as set forth in the Corrective Action Investigation Plan for Corrective Action Unit 105: Area 2 Yucca Flat Atmospheric Test Sites; and in accordance with the Soils Activity Quality Assurance Plan, which establishes requirements, technical planning, and general quality practices.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1987-09-24
The North Hollywood - Burbank Well Field (NHBWF) is located within the San Fernando Valley Ground Water basin, which can provide drinking water for approximately 500,000 people residing in the San Fernando Valley and Los Angeles. In 1980 TCE and PCE were discovered in 25% of DWP's wells. In July 1981, DWP and the Southern California Association of Governments began a two-year study funded by EPA. The study revealed the occurrence of ground-water contamination plume patterns that are spreading toward the southeast. The primary contaminant of concern to the ground-water is TCE with PCE and other VOCs present. The selectedmore » remedial action for the site is ground-water pump and treatment using aeration and granular-activated-carbon - air-filtering units, with discharge to the DWP Pumping Station for chlorination and distribution. Spent carbon will be removed and replaced with fresh carbon, with the spent carbon scheduled either for disposal or regeneration. The estimated capital cost for this remedial action is $2,192,895 with present worth OandM of $2,284,105.« less
NASA Astrophysics Data System (ADS)
Alekseev, Oleg; Mineev-Weinstein, Mark
2016-12-01
A point source on a plane constantly emits particles which rapidly diffuse and then stick to a growing cluster. The growth probability of a cluster is presented as a sum over all possible scenarios leading to the same final shape. The classical point for the action, defined as a minus logarithm of the growth probability, describes the most probable scenario and reproduces the Laplacian growth equation, which embraces numerous fundamental free boundary dynamics in nonequilibrium physics. For nonclassical scenarios we introduce virtual point sources, in which presence the action becomes the Kullback-Leibler entropy. Strikingly, this entropy is shown to be the sum of electrostatic energies of layers grown per elementary time unit. Hence the growth probability of the presented nonequilibrium process obeys the Gibbs-Boltzmann statistics, which, as a rule, is not applied out from equilibrium. Each layer's probability is expressed as a product of simple factors in an auxiliary complex plane after a properly chosen conformal map. The action at this plane is a sum of Robin functions, which solve the Liouville equation. At the end we establish connections of our theory with the τ function of the integrable Toda hierarchy and with the Liouville theory for noncritical quantum strings.
Final Environmental assessment for the Uranium Lease Management Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-07-01
The US Department of Energy (DOE) has prepared a programmatic environmental assessment (EA) of the proposed action to continue leasing withdrawn lands and DOE-owned patented claims for the exploration and production of uranium and vanadium ores. The Domestic Uranium Program regulation, codified at Title 10, Part 760.1, of the US Code of Federal Regulations (CFR), gives DOE the flexibility to continue leasing these lands under the Uranium Lease Management Program (ULMP) if the agency determines that it is in its best interest to do so. A key element in determining what is in DOE`s ``best interest`` is the assessment ofmore » the environmental impacts that may be attributable to lease tract operations and associated activities. On the basis of the information and analyses presented in the EA for the ULMP, DOE has determined that the proposed action does not constitute a major Federal action significantly affecting the quality of the human environment, as defined in the National Environmental Policy Act (NEPA) of 1969 (42 United States Code 4321 et seq.), as amended.Therefore, preparation of an environmental impact statement is not required for the ULMP,and DOE is issuing this Finding, of No Significant Impact (FONSI).« less
Modelling conflicts with cluster dynamics in networks
NASA Astrophysics Data System (ADS)
Tadić, Bosiljka; Rodgers, G. J.
2010-12-01
We introduce cluster dynamical models of conflicts in which only the largest cluster can be involved in an action. This mimics the situations in which an attack is planned by a central body, and the largest attack force is used. We study the model in its annealed random graph version, on a fixed network, and on a network evolving through the actions. The sizes of actions are distributed with a power-law tail, however, the exponent is non-universal and depends on the frequency of actions and sparseness of the available connections between units. Allowing the network reconstruction over time in a self-organized manner, e.g., by adding the links based on previous liaisons between units, we find that the power-law exponent depends on the evolution time of the network. Its lower limit is given by the universal value 5/2, derived analytically for the case of random fragmentation processes. In the temporal patterns behind the size of actions we find long-range correlations in the time series of the number of clusters and the non-trivial distribution of time that a unit waits between two actions. In the case of an evolving network the distribution develops a power-law tail, indicating that through repeated actions, the system develops an internal structure with a hierarchy of units.
75 FR 43 - Modification of Class E Airspace; Beckley, WV
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-04
... and management of the aircraft operations at Raleigh County Memorial Airport. DATES: Effective 0901... Aviation Administration (FAA), DOT. ACTION: Direct final rule, confirmation of effective date. SUMMARY: This action confirms the effective date of a direct final rule published in the Federal Register that...
75 FR 43 - Modification of Class E Airspace; Sarasota, FL
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-04
... Aviation Administration (FAA), DOT. ACTION: Direct final rule, confirmation of effective date. SUMMARY: This action confirms the effective date of a direct final rule published in the Federal Register that... increases the safety and management of the aircraft operations at Sarasota/Bradenton International Airport...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 24 Housing and Urban Development 1 2014-04-01 2014-04-01 false Final action. 7.37 Section 7.37 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 24 Housing and Urban Development 1 2013-04-01 2013-04-01 false Final action. 7.37 Section 7.37 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 24 Housing and Urban Development 1 2012-04-01 2012-04-01 false Final action. 7.37 Section 7.37 Housing and Urban Development Office of the Secretary, Department of Housing and Urban Development EQUAL EMPLOYMENT OPPORTUNITY; POLICY, PROCEDURES AND PROGRAMS Equal Employment Opportunity Without Regard to Race...
Photodynamic effect of curcumin on Vibrio parahaemolyticus.
Wu, Juan; Mou, Haijin; Xue, Changhu; Leung, Albert Wingnang; Xu, Chuanshan; Tang, Qing-Juan
2016-09-01
Vibrio parahaemolyticus (V. parahaemolyticus) is currently a major cause of bacterial diarrhoea associated with seafood consumption. The objective of this study was to determine the inactivation effect of curcumin-mediated photodynamic action on V. parahaemolyticus. First of all, V. parahaemolyticus suspended in PBS buffer was irradiated by a visible light from a LED light source with an energy density of 3.6J/cm(2). Colony forming units (CFU) were counted and the viability of V. parahaemolyticus cells was calculated after treatment. Singlet oxygen ((1)O2) production after photodynamic action of curcumin was evaluated using 9,10-Anthracenediyl-bis (methylene) dimalonic acid (ADMA). Bacterial outer membrane protein was extracted and analyzed using electrophoresis SDS-PAGE. DNA and RNA of V. parahaemolyticus were also extracted and analyzed using agarose gel electrophoresis after photodynamic treatment. Finally, the efficacy of photodynamic action of curcumin was preliminarily evaluated in the decontamination of V. parahaemolyticus in oyster. Results showed that the viability of V. parahaemolyticus was significantly decreased to non-detectable levels over 6.5-log reductions with the curcumin concentration of 10 and 20μM. Photodynamic action of curcumin significantly increased the singlet oxygen level with the curcumin concentration of 10μM. Notable damage was found to bacterial outer membrane proteins and genetic materials after photodynamic treatment. Photodynamic action of curcumin reduced the number of V. parahaemolyticus contaminating in oyster to non-detectable level. Our findings demonstrated that photodynamic action of curcumin could be a potentially good method to inactivate Vibrio parahaemolyticus contaminating in oyster. Copyright © 2016 Elsevier B.V. All rights reserved.
Transforming Language Ideologies through Action Research: A Case Study of Bilingual Science Learning
NASA Astrophysics Data System (ADS)
Yang, Eunah
This qualitative case study explored a third grade bilingual teacher's transformative language ideologies through participating in a collaborative action research project. By merging language ideologies theory, Cultural Historical Activity Theory (CHAT), and action research, I was able to identify the analytic focus of this study. I analyzed how one teacher and I, the researcher, collaboratively reflected on classroom language practices during the video analysis meetings and focus groups. Further, I analyzed twelve videos that we coded together to see the changes in the teacher's language practices over time. My unit of analysis was the discourse practice mediated by additive language ideologies. Throughout the collaborative action research process, we both critically reflected on the classroom language use. We also developed a critical consciousness about the participatory shifts and learning of focal English Learner (EL) students. Finally, the teacher made changes to her classroom language practices. The results of this study will contribute to the literacy education research field for theoretical, methodological, and practical insights. The integration of language ideologies, CHAT, and action research can help educational practitioners, researchers, and policy makers understand the importance of transforming teachers' language ideologies in designing additive learning contexts for ELs. From a methodological perspective, the transformative language ideologies through researcher and teacher collaborated video analysis process provide a unique contribution to the language ideologies in education literature, with analytic triangulation. As a practical implication, this study suggests action research can be one of the teacher education tools to help the teachers transform language ideologies for EL education.
Kalmár, Éva; Lasher, Jason Richard; Tarry, Thomas Dean; Myers, Andrea; Szakonyi, Gerda; Dombi, György; Baki, Gabriella; Alexander, Kenneth S.
2013-01-01
The availability of suppositories in Hungary, especially in clinical pharmacy practice, is usually provided by extemporaneous preparations. Due to the known advantages of rectal drug administration, its benefits are frequently utilized in pediatrics. However, errors during the extemporaneous manufacturing process can lead to non-homogenous drug distribution within the dosage units. To determine the root cause of these errors and provide corrective actions, we studied suppository samples prepared with exactly known errors using both cerimetric titration and HPLC technique. Our results show that the most frequent technological error occurs when the pharmacist fails to use the correct displacement factor in the calculations which could lead to a 4.6% increase/decrease in the assay in individual dosage units. The second most important source of error can occur when the molding excess is calculated solely for the suppository base. This can further dilute the final suppository drug concentration causing the assay to be as low as 80%. As a conclusion we emphasize that the application of predetermined displacement factors in calculations for the formulation of suppositories is highly important, which enables the pharmacist to produce a final product containing exactly the determined dose of an active substance despite the different densities of the components. PMID:25161378
Kalmár, Eva; Lasher, Jason Richard; Tarry, Thomas Dean; Myers, Andrea; Szakonyi, Gerda; Dombi, György; Baki, Gabriella; Alexander, Kenneth S
2014-09-01
The availability of suppositories in Hungary, especially in clinical pharmacy practice, is usually provided by extemporaneous preparations. Due to the known advantages of rectal drug administration, its benefits are frequently utilized in pediatrics. However, errors during the extemporaneous manufacturing process can lead to non-homogenous drug distribution within the dosage units. To determine the root cause of these errors and provide corrective actions, we studied suppository samples prepared with exactly known errors using both cerimetric titration and HPLC technique. Our results show that the most frequent technological error occurs when the pharmacist fails to use the correct displacement factor in the calculations which could lead to a 4.6% increase/decrease in the assay in individual dosage units. The second most important source of error can occur when the molding excess is calculated solely for the suppository base. This can further dilute the final suppository drug concentration causing the assay to be as low as 80%. As a conclusion we emphasize that the application of predetermined displacement factors in calculations for the formulation of suppositories is highly important, which enables the pharmacist to produce a final product containing exactly the determined dose of an active substance despite the different densities of the components.
Rep. Lamborn, Doug [R-CO-5
2014-04-01
House - 04/16/2014 Referred to the Subcommittee on Immigration and Border Security. (All Actions) Notes: For further action, see S.2195, which became Public Law 113-100 on 4/18/2014. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:
Monte Carlo simulation of the transmission of measles: Beyond the mass action principle
NASA Astrophysics Data System (ADS)
Zekri, Nouredine; Clerc, Jean Pierre
2002-04-01
We present a Monte Carlo simulation of the transmission of measles within a population sample during its growing and equilibrium states by introducing two different vaccination schedules of one and two doses. We study the effects of the contact rate per unit time ξ as well as the initial conditions on the persistence of the disease. We found a weak effect of the initial conditions while the disease persists when ξ lies in the range 1/L-10/L (L being the latent period). Further comparison with existing data, prediction of future epidemics and other estimations of the vaccination efficiency are provided. Finally, we compare our approach to the models using the mass action principle in the first and another epidemic region and found the incidence independent of the number of susceptibles after the epidemic peak while it strongly fluctuates in its growing region. This method can be easily applied to other human, animal, and plant diseases and includes more complicated parameters.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mirchandani, M.G.; Johnson, G.M.; Bove, L.J.
1989-12-01
An enhanced preliminary assessment (PA) of air pollution was conducted at Fort Douglas (FD) under the Base Closure Program. FD is an active military installation located in Salt Lake City, Utah. The Fort consists of the U.S. Army and Navy Reserve Centers, family housing units, a military museum, a chapel, clubs, swimming pool, a cemetery and various other support buildings. 50.8 acres of the 119 acres owned by FD are proposed to be excessed. Based on information obtained during the onsite visit and from available drawings and reports, three environmentally significant operations (ESOs) have been identified. These include asbestos, radonmore » and transformers. No immediate action has been recommended for any of the ESOs. Site investigations have been recommended for asbestos and the transformers. A radon sampling program is currently underway at FD. This radon sampling program is being conducted by Fort Carson; the results should be evaluated as they become available, and the appropriate actions taken.« less
Dirikx, Astrid; Gelders, Dave
2010-11-01
This study examines the way Dutch and French newspapers frame climate change during the annual United Nations Conferences of the Parties. The methods used in previous studies on the framing of climate change do not allow for general cross-national comparisons. We conduct a quantitative deductive framing analysis on 257 quality Dutch and French newspaper articles between 2001 and 2007. Both countries' newspapers seem to frame climate change through mainly the same lens. The majority of the articles make reference to the consequences of the (non-)pursuit of a certain course of action and of possible losses and gains (consequences frame). Additionally, many articles mention the need for urgent actions, refer to possible solutions and suggest that governments are responsible for and/or capable of alleviating climate change problems (responsibility frame). Finally, the conflict frame was found to be used less often than the aforementioned frames, but more regularly than the human interest frame.
Mayer, Alejandro M S; Rodríguez, Abimael D; Taglialatela-Scafati, Orazio; Fusetani, Nobuhiro
2017-08-29
The peer-reviewed marine pharmacology literature from 2012 to 2013 was systematically reviewed, consistent with the 1998-2011 reviews of this series. Marine pharmacology research from 2012 to 2013, conducted by scientists from 42 countries in addition to the United States, reported findings on the preclinical pharmacology of 257 marine compounds. The preclinical pharmacology of compounds isolated from marine organisms revealed antibacterial, antifungal, antiprotozoal, antituberculosis, antiviral and anthelmitic pharmacological activities for 113 marine natural products. In addition, 75 marine compounds were reported to have antidiabetic and anti-inflammatory activities and affect the immune and nervous system. Finally, 69 marine compounds were shown to display miscellaneous mechanisms of action which could contribute to novel pharmacological classes. Thus, in 2012-2013, the preclinical marine natural product pharmacology pipeline provided novel pharmacology and lead compounds to the clinical marine pharmaceutical pipeline, and contributed significantly to potentially novel therapeutic approaches to several global disease categories.
76 FR 40811 - Maneb; Tolerance Actions
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-12
...; Tolerance Actions AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: EPA is... established a docket for this action under docket identification (ID) number EPA-HQ-OPP-2010-0327. All... . SUPPLEMENTARY INFORMATION: I. General Information A. Does this action apply to me? You may be potentially...
77 FR 47513 - Definition of Enforcement Action
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-09
... Enforcement Action AGENCY: National Indian Gaming Commission, Interior. ACTION: Final rule. SUMMARY: The... to add a definition of ``enforcement action.'' DATES: Effective Date: September 10, 2012. FOR FURTHER... that to supplement the amendments made to Part 573, a definition of ``enforcement action'' needed to be...
DOE Office of Scientific and Technical Information (OSTI.GOV)
ITLV.
1999-03-01
The Corrective Action Investigation Plan for Corrective Action Unit 428, Area 3 Septic Waste Systems 1 and 5, has been developed in accordance with the Federal Facility Agreement and Consent Order that was agreed to by the U. S. Department of Energy, Nevada Operations Office; the State of Nevada Division of Environmental Protection; and the U. S. Department of Defense. Corrective Action Unit 428 consists of Corrective Action Sites 03- 05- 002- SW01 and 03- 05- 002- SW05, respectively known as Area 3 Septic Waste System 1 and Septic Waste System 5. This Corrective Action Investigation Plan is used inmore » combination with the Work Plan for Leachfield Corrective Action Units: Nevada Test Site and Tonopah Test Range, Nevada , Rev. 1 (DOE/ NV, 1998c). The Leachfield Work Plan was developed to streamline investigations at leachfield Corrective Action Units by incorporating management, technical, quality assurance, health and safety, public involvement, field sampling, and waste management information common to a set of Corrective Action Units with similar site histories and characteristics into a single document that can be referenced. This Corrective Action Investigation Plan provides investigative details specific to Corrective Action Unit 428. A system of leachfields and associated collection systems was used for wastewater disposal at Area 3 of the Tonopah Test Range until a consolidated sewer system was installed in 1990 to replace the discrete septic waste systems. Operations within various buildings at Area 3 generated sanitary and industrial wastewaters potentially contaminated with contaminants of potential concern and disposed of in septic tanks and leachfields. Corrective Action Unit 428 is composed of two leachfield systems in the northern portion of Area 3. Based on site history collected to support the Data Quality Objectives process, contaminants of potential concern for the site include oil/ diesel range total petroleum hydrocarbons, and Resource Conservation and Recovery Act characteristic volatile organic compounds, semivolatile organic compounds, and metals. A limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from four of the septic tanks and if radiological field screening levels are exceeded. Additional samples will be analyzed for geotechnical and hydrological properties and a bioassessment may be performed. The technical approach for investigating this Corrective Action Unit consists of the following activities: Perform video surveys of the discharge and outfall lines. Collect samples of material in the septic tanks. Conduct exploratory trenching to locate and inspect subsurface components. Collect subsurface soil samples in areas of the collection system including the septic tanks and outfall end of distribution boxes. Collect subsurface soil samples underlying the leachfield distribution pipes via trenching. Collect surface and near- surface samples near potential locations of the Acid Sewer Outfall if Septic Waste System 5 Leachfield cannot be located. Field screen samples for volatile organic compounds, total petroleum hydrocarbons, and radiological activity. Drill boreholes and collect subsurface soil samples if required. Analyze samples for total volatile organic compounds, total semivolatile organic compounds, total Resource Conservation and Recovery Act metals, and total petroleum hydrocarbons (oil/ diesel range organics). Limited number of samples will be analyzed for gamma- emitting radionuclides and isotopic uranium from particular septic tanks and if radiological field screening levels are exceeded. Collect samples from native soils beneath the distribution system and analyze for geotechnical/ hydrologic parameters. Collect and analyze bioassessment samples at the discretion of the Site Supervisor if total petroleum hydrocarbons exceed field- screening levels.« less
1990-04-09
may not be reeased (or open ibkou eanb t it his been deared by de appropriate military servlc or govemlient mency. Co KOREA TO KALIMANTAN AND BEYOND... Kalimantan and Beyond: The Employment of United States Army Forces Individual Study in Military Civic Action in the Pacific 6. PERFORMING ORG. REPORTN MBER...PROGRAM PAPER KOREA TO KALIMANTAN AND BEYOND: THE EMPLOYMENT OF UNITED STATES ARMY FORCES IN MILITARY CIVIC ACTION IN THE PACIFIC COMMAND AREA OF
ERIC Educational Resources Information Center
Reeder, William W.; And Others
In order to illustrate the cross-culture applicability of Reeder's Theory of Beliefs, Disbeliefs, and Social Action and its usefulness in predicting and explaining social actions, studies conducted in communities in India, Sudan, Lebanon, northeastern United States, and western United States are examined. Using this theory, beliefs and disbeliefs…
Sen. Durbin, Richard J. [D-IL
2009-02-05
House - 04/23/2009 For further action see P.L. 111-14. (All Actions) Notes: For further action, see S.520, which became Public Law 111-14 on 4/23/2009. Tracker: This bill has the status Passed SenateHere are the steps for Status of Legislation:
Code of Federal Regulations, 2013 CFR
2013-01-01
... extraordinary threat to the national security, foreign policy, and economy of the United States. As a result... of May 1, 2012. The President took these actions to deal with the unusual and extraordinary threat to the national security, foreign policy, and economy of the United States constituted by the actions of...
Gestalt Principles in the Control of Motor Action
ERIC Educational Resources Information Center
Klapp, Stuart T.; Jagacinski, Richard J.
2011-01-01
We argue that 4 fundamental gestalt phenomena in perception apply to the control of motor action. First, a motor gestalt, like a perceptual gestalt, is holistic in the sense that it is processed as a single unit. This notion is consistent with reaction time results indicating that all gestures for a brief unit of action must be programmed prior to…
Multi-Unit Considerations for Human Reliability Analysis
DOE Office of Scientific and Technical Information (OSTI.GOV)
St. Germain, S.; Boring, R.; Banaseanu, G.
This paper uses the insights from the Standardized Plant Analysis Risk-Human Reliability Analysis (SPAR-H) methodology to help identify human actions currently modeled in the single unit PSA that may need to be modified to account for additional challenges imposed by a multi-unit accident as well as identify possible new human actions that might be modeled to more accurately characterize multi-unit risk. In identifying these potential human action impacts, the use of the SPAR-H strategy to include both errors in diagnosis and errors in action is considered as well as identifying characteristics of a multi-unit accident scenario that may impact themore » selection of the performance shaping factors (PSFs) used in SPAR-H. The lessons learned from the Fukushima Daiichi reactor accident will be addressed to further help identify areas where improved modeling may be required. While these multi-unit impacts may require modifications to a Level 1 PSA model, it is expected to have much more importance for Level 2 modeling. There is little currently written specifically about multi-unit HRA issues. A review of related published research will be presented. While this paper cannot answer all issues related to multi-unit HRA, it will hopefully serve as a starting point to generate discussion and spark additional ideas towards the proper treatment of HRA in a multi-unit PSA.« less
Interdisciplinary Unit on Land Use and Social Action in Pinellas County.
ERIC Educational Resources Information Center
Pinellas County District School Board, Clearwater, FL.
Interdisciplinary social studies units on land use and social action for eighth and ninth grade students are provided. Although specifically written for students living in Pinellas County, Florida, the units can be adapted easily for teaching about land use in general and/or land use in one's own community. The overall objective is to help…
EPA is taking direct final action to approve a request from the state of North Carolina for the EPA to relax the Reid Vapor Pressure standard applicable to gasoline introduced into commerce in the summer time for Mecklenburg and Gaston counties.
42 CFR 93.406 - Final HHS actions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues... 42 Public Health 1 2011-10-01 2011-10-01 false Final HHS actions. 93.406 Section 93.406 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES HEALTH ASSESSMENTS AND HEALTH...
The EPA is taking final action to relax the federal volatility (RVP) standard applicable to gasoline supplied to the Birmingham area from 7.8 pounds per square inch (psi) to 9.0 psi during the summer ozone season.
76 FR 1999 - Establishment of Class E Airspace; Panguitch, UT
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-12
... Aviation Administration (FAA), DOT. ACTION: Final rule. SUMMARY: This action will establish Class E... the safety and management of Instrument Flight Rules (IFR) operations at the airport. DATES: Effective... found merit in this comment, and will incorporate this change in the final rule. With the exception of...
Code of Federal Regulations, 2010 CFR
2010-07-01
... OF MILITARY RECORDS OF THE COAST GUARD Judgment and Disposition § 52.64 Final action. (a) The Board.... 1552, as follows: (1) The Board may deny an application for the correction of military records. (2... for the correction of military records in any of the following categories: (i) An application to...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-15
... 2150-2162 and 2500-2690 MHz Bands AGENCY: Federal Communications Commission. ACTION: Final rule..., demonstrate substantial service by combining licenses. Finally, on its own motion, the Commission corrects a... actions clarify the requirements necessary for BRS and EBS licensees to demonstrate substantial service...
78 FR 48161 - Proposed Consent Decree, Clean Air Act Citizen Suit
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-07
... further alleged that EPA had failed to take final action on the attainment demonstration, contingency... a notice taking final action on the attainment demonstration, contingency measures, emission....gov . You may use the www.regulations.gov to submit or view public comments, access the index listing...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1992-02-01
This appendix assesses the present conditions and data gathered about the two inactive uranium mill tailings sites near Rifle, Colorado, and the designated disposal site six miles north of Rifle in the area of Estes Gulch. It consolidates available engineering, radiological, geotechnical, hydrological, meteorological, and other information pertinent to the design of the Remedial Action Plan (RAP). The data characterize conditions at the mill, tailings, and disposal site so that the Remedial Action Contractor (RAC) may complete final designs for the remedial actions.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-10
...This action finalizes minimum Federal requirements under the Safe Drinking Water Act (SDWA) for underground injection of carbon dioxide (CO2) for the purpose of geologic sequestration (GS). GS is one of a portfolio of options that could be deployed to reduce CO2 emissions to the atmosphere and help to mitigate climate change. This final rule applies to owners or operators of wells that will be used to inject CO2 into the subsurface for the purpose of long-term storage. It establishes a new class of well, Class VI, and sets minimum technical criteria for the permitting, geologic site characterization, area of review (AoR) and corrective action, financial responsibility, well construction, operation, mechanical integrity testing (MIT), monitoring, well plugging, post-injection site care (PISC), and site closure of Class VI wells for the purposes of protecting underground sources of drinking water (USDWs). The elements of this rulemaking are based on the existing Underground Injection Control (UIC) regulatory framework, with modifications to address the unique nature of CO2 injection for GS. This rule will help ensure consistency in permitting underground injection of CO2 at GS operations across the United States and provide requirements to prevent endangerment of USDWs in anticipation of the eventual use of GS to reduce CO2 emissions to the atmosphere and to mitigate climate change.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 45 Public Welfare 3 2011-10-01 2011-10-01 false Actions. 689.3 Section 689.3 Public Welfare... Actions. (a) Possible final actions listed in this paragraph (a) for guidance range from minimal... include possible criminal sanctions. (1) Group I actions. (i) Send a letter of reprimand to the individual...
Code of Federal Regulations, 2010 CFR
2010-10-01
... 45 Public Welfare 3 2010-10-01 2010-10-01 false Actions. 689.3 Section 689.3 Public Welfare... Actions. (a) Possible final actions listed in this paragraph (a) for guidance range from minimal... include possible criminal sanctions. (1) Group I actions. (i) Send a letter of reprimand to the individual...
DOE Office of Scientific and Technical Information (OSTI.GOV)
NSTec Environmental Restoration
This Corrective Action Decision Document/Closure Report (CADD/CR) was prepared by the Defense Threat Reduction Agency (DTRA) for Corrective Action Unit (CAU) 383, Area 12 E-Tunnel Sites, which is the joint responsibility of DTRA and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office (NNSA/NSO). This CADD/CR is consistent with the requirements of the Federal Facility Agreement and Consent Order (FFACO) agreed to by the State of Nevada, the DOE, and the U.S. Department of Defense. Corrective Action Unit 383 is comprised of three Corrective Action Sites (CASs) and two adjacent areas: • CAS 12-06-06, Muckpile •more » CAS 12-25-02, Oil Spill • CAS 12-28-02, Radioactive Material • Drainage below the Muckpile • Ponds 1, 2, and 3 The purpose of this CADD/CR is to provide justification and documentation to support the recommendation for closure with no further corrective action, by placing use restrictions at the three CASs and two adjacent areas of CAU 383.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lynn Kidman
This document constitutes an addendum to the November 2003, Closure Report for Corrective Action Unit 355: Area 2 Cellars/Mud Pits as described in the document Recommendations and Justifications for Modifications for Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office Federal Facility Agreement and Consent Order (UR Modification document) dated February 2008. The UR Modification document was approved by NDEP on February 26, 2008. The approval of the UR Modification document constituted approval of each of the recommended UR modifications. In conformance with the UR Modification document, this addendum consists of: • Thismore » cover page that refers the reader to the UR Modification document for additional information • The cover and signature pages of the UR Modification document • The NDEP approval letter • The corresponding section of the UR Modification document This addendum provides the documentation justifying the cancellation of the URs for: • CAS 02-37-01, Cellar & Mud Pit • CAS 02-37-03, Cellar & Mud Pit • CAS 02-37-04, Cellar & Mud Pit • CAS 02-37-05, Cellar & Mud Pit • CAS 02-37-06, Cellar & Mud Pit • CAS 02-37-07, Cellar & Mud Pit • CAS 02-37-10, Cellar & Mud Pit • CAS 02-37-11, Cellar & Mud Pit • CAS 02-37-12, Cellar & Mud Pit • CAS 02-37-13, Cellar & Mud Pit • CAS 02-37-14, Cellar & Mud Pit • CAS 02-37-15, Cellar & Mud Pit • CAS 02-37-16, Cellar & Mud Pit • CAS 02-37-17, Cellar • CAS 02-37-18, Cellar & Tanks These URs were established as part of Federal Facility Agreement and Consent Order (FFACO) corrective actions and were based on the presence of contaminants at concentrations greater than the action levels established at the time of the initial investigation (FFACO, 1996; as amended August 2006). Since these URs were established, practices and procedures relating to the implementation of risk-based corrective actions (RBCA) have changed. Therefore, these URs were re-evaluated against the current RBCA criteria as defined in the Industrial Sites Project Establishment of Final Action Levels (NNSA/NSO, 2006c). This re-evaluation consisted of comparing the original data (used to define the need for the URs) to risk-based final action levels (FALs) developed using the current Industrial Sites RBCA process. The re-evaluation resulted in a recommendation to remove these URs because contamination is not present at these sites above the risk-based FALs. Requirements for inspecting and maintaining these URs will be canceled, and the postings and signage at each site will be removed. Fencing and posting may be present at these sites that are unrelated to the FFACO URs such as for radiological control purposes as required by the NV/YMP Radiological Control Manual (NNSA/NSO, 2004f). This modification will not affect or modify any non-FFACO requirements for fencing, posting, or monitoring at these sites.« less
Incident reporting: Its role in aviation safety and the acquisition of human error data
NASA Technical Reports Server (NTRS)
Reynard, W. D.
1983-01-01
The rationale for aviation incident reporting systems is presented and contrasted to some of the shortcomings of accident investigation procedures. The history of the United State's Aviation Safety Reporting System (ASRS) is outlined and the program's character explained. The planning elements that resulted in the ASRS program's voluntary, confidential, and non-punitive design are discussed. Immunity, from enforcement action and misuse of the volunteered data, is explained and evaluated. Report generation techniques and the ASRS data analysis process are described; in addition, examples of the ASRS program's output and accomplishments are detailed. Finally, the value of incident reporting for the acquisition of safety information, particularly human error data, is explored.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patrick Matthews; Christy Sloop
2012-02-01
Corrective Action Unit (CAU) 569 is located in Area 3 of the Nevada National Security Site, which is approximately 65 miles northwest of Las Vegas, Nevada. Corrective Action Unit 569 comprises the nine numbered corrective action sites (CASs) and one newly identified site listed below: (1) 03-23-09, T-3 Contamination Area (hereafter referred to as Annie, Franklin, George, and Moth); (2) 03-23-10, T-3A Contamination Area (hereafter referred to as Harry and Hornet); (3) 03-23-11, T-3B Contamination Area (hereafter referred to as Fizeau); (4) 03-23-12, T-3S Contamination Area (hereafter referred to as Rio Arriba); (5) 03-23-13, T-3T Contamination Area (hereafter referred tomore » as Catron); (6) 03-23-14, T-3V Contamination Area (hereafter referred to as Humboldt); (7) 03-23-15, S-3G Contamination Area (hereafter referred to as Coulomb-B); (8) 03-23-16, S-3H Contamination Area (hereafter referred to as Coulomb-A); (9) 03-23-21, Pike Contamination Area (hereafter referred to as Pike); and (10) Waste Consolidation Site 3A. Because CAU 569 is a complicated site containing many types of releases, it was agreed during the data quality objectives (DQO) process that these sites will be grouped. These sites are being investigated because existing information on the nature and extent of potential contamination is insufficient to evaluate and recommend corrective action alternatives (CAAs). Additional information will be obtained by conducting a corrective action investigation before evaluating CAAs and selecting the appropriate corrective action for each study group. The results of the field investigation will support a defensible evaluation of viable CAAs that will be presented in the Corrective Action Decision Document. The sites will be investigated based on the DQOs developed on September 26, 2011, by representatives of the Nevada Division of Environmental Protection and the U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office. The DQO process was used to identify and define the type, amount, and quality of data needed to develop and evaluate appropriate corrective actions for CAU 569. The presence and nature of contamination at CAU 569 will be evaluated based on information collected from a field investigation. Radiological contamination will be evaluated based on a comparison of the total effective dose (TED) at sample locations to the dose-based final action level (FAL). The TED will be calculated as the total of separate estimates of internal and external dose. Results from the analysis of soil samples will be used to calculate internal radiological dose. Thermoluminescent dosimeters placed at the center of each sample location will be used to measure external radiological dose. A field investigation will be performed to define any areas where TED exceeds the FAL and to determine whether contaminants of concern are present at the site from other potential releases. The presence and nature of contamination from other types of releases (e.g., excavation, migration, and any potential releases discovered during the investigation) will be evaluated using soil samples collected from biased locations indicating the highest levels of contamination. Appendix A provides a detailed discussion of the DQO methodology and the objectives specific to each study group.« less
Arribas, Belén; Rodríguez-Cabezas, Maria Elena; Comalada, Mònica; Bailón, Elvira; Camuesco, Desireé; Olivares, Mónica; Xaus, Jordi; Zarzuelo, Antonio; Gálvez, Julio
2009-01-01
The preventative effects of the probiotic Lactobacillus fermentum CECT5716 were evaluated in the lipopolysaccharide (LPS) model of septic shock in mice. The probiotic was administered suspended in drinking water at the final concentration of 108 colony-forming units/ml for 2 weeks before the induction of an endotoxic shock by an intraperitoneal injection of LPS (400 microg/200 microl per mouse). Blood and different organs were collected after 24 h to evaluate the severity of the endotoxic shock and the preventative effects of the probiotic. L. fermentum reduced TNF-alpha levels in blood, which promotes the major alterations observed during septic shock, as well as the infiltration of activated neutrophils into the lungs. Furthermore, free radical overproduction and oxidative stress were associated with a significant decrease in hepatic glutathione levels in septic mice, and with an excessive NO production attributed to the induction of the inducible isoform of NO synthase (iNOS). In fact, hepatic glutathione levels were significantly increased in the group of mice receiving the probiotic, and the increased iNOS expression both in the colon and lungs was down-regulated in those mice treated with L. fermentum. Finally, pre-treatment with L. fermentum may also exert its protective action modulating the expression of different cytokines in splenocyte-derived T cells such us IL-2, IL-5, IL-6 or IL-10. In conclusion, pre-treatment with L. fermentum may exert its protective action against LPS-induced organ damage in mice by a combination of several actions including its antioxidant properties and by reduction of the synthesis of the pro-inflammatory TNF-alpha and IL-6.
2006 Annual Operations Report for INTEC Operable Unit 3-13, Group 1, Tank Farm Interim Action
DOE Office of Scientific and Technical Information (OSTI.GOV)
D. E. Shanklin
2007-02-14
This annual operations report describes the requirements followed and activities conducted to inspect, monitor, and maintain the items installed during performance of the Waste Area Group 3, Operable Unit 3-13, Group 1, Tank Farm Interim Action, at the Idaho Nuclear Technology and Engineering Center. This report covers the time period from January 1 through December 31, 2006, and describes inspection and monitoring activities for the surface-sealed areas within the tank farm, concrete-lined ditches and culverts in and around the tank farm, the lift station, and the lined evaporation pond. These activities are intended to assure that the interim action ismore » functioning adequately to meet the objectives stated in the Operable Unit 3-13, Record of Decision for the Group 1, Tank Farm Interim Action (DOE/ID-10660) as described in the Group 1 Remedial Design/Remedial Action Work Plan (DOE/ID-10772).« less
42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 42 Public Health 1 2013-10-01 2013-10-01 false Court review of final administrative action; exhaustion of administrative remedies. 8.34 Section 8.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for...
42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 42 Public Health 1 2012-10-01 2012-10-01 false Court review of final administrative action; exhaustion of administrative remedies. 8.34 Section 8.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for...
42 CFR 8.34 - Court review of final administrative action; exhaustion of administrative remedies.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 42 Public Health 1 2014-10-01 2014-10-01 false Court review of final administrative action; exhaustion of administrative remedies. 8.34 Section 8.34 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND HUMAN SERVICES GENERAL PROVISIONS CERTIFICATION OF OPIOID TREATMENT PROGRAMS Procedures for...
75 FR 58016 - Notice of Final Federal Agency Actions on Proposed Highway in California
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-23
... such actions were taken, are described in the Final Environmental Assessment (FEA) and Finding of No... project records. The FEA, and other project records are available by contacting the California Department of Transportation at the address provided above. The FEA can be viewed and downloaded from the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-09-23
... actions taken by the FHWA and other Federal agencies that are final within the meaning of 23 U.S.C. 139(l... Conservation and Management Act of 1976, as amended [16 U.S.C. 1801 et seq.]; Bald and Golden Eagle Protection...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-30
... Department of Agriculture AGENCY: Environmental Protection Agency (EPA). ACTION: Final rule. SUMMARY: The Environmental Protection Agency (EPA) is taking final action to approve North Dakota Department of Agriculture's... Department of Agriculture (iv) The initials RMP mean Risk Management Plan (v) The initials CFR mean Code of...
42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.
Code of Federal Regulations, 2014 CFR
2014-10-01
... research misconduct. 93.410 Section 93.410 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement or...
42 CFR 93.410 - Final HHS action with no settlement or finding of research misconduct.
Code of Federal Regulations, 2012 CFR
2012-10-01
... research misconduct. 93.410 Section 93.410 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.410 Final HHS action with no settlement or...
42 CFR 93.411 - Final HHS action with settlement or finding of research misconduct.
Code of Federal Regulations, 2014 CFR
2014-10-01
... research misconduct. 93.411 Section 93.411 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF HEALTH AND... FACILITIES PUBLIC HEALTH SERVICE POLICIES ON RESEARCH MISCONDUCT Responsibilities of the U.S. Department of Health and Human Services Research Misconduct Issues § 93.411 Final HHS action with settlement or finding...