1993-04-14
involvement in Operations DESERT SHIELD and STORM. The 498th was a unique unit, well-suited for the gamut of operations conducted by the 2AD (FWD) during its...Division (Forward), during that unit’s involvement in Operations DESERT SHIELD and STORM. The 498th was a unique unit, well-suited for the gamut of...well-suited fir the gamut of operations conducted by 2AD (FWD) during its stay in Southwest Asia (SWA) . I commanded the 498th Support Battalion from
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
This decision document presents the selected remedial action for Operable Unit Two for the Texarkana Wood Preserving Company (TWPC) Superfund Site (Site) in Texarkana, Texas. This operable unit is the second of two operable units planned for the Site. Operable Unit Two involves remediation of the deeper ground water contaminated above the action levels in a limited area of the Silty Sand Zone around Monitoring Well-16.
Some subclasses of multivalent functions involving a certain linear operator
NASA Astrophysics Data System (ADS)
Srivastava, H. M.; Patel, J.
2005-10-01
The authors investigate various inclusion and other properties of several subclasses of the class of normalized p-valent analytic functions in the open unit disk, which are defined here by means of a certain linear operator. Problems involving generalized neighborhoods of analytic functions in the class are investigated. Finally, some applications of fractional calculus operators are considered.
Analysis of the implementation of ergonomic design at the new units of an oil refinery.
Passero, Carolina Reich Marcon; Ogasawara, Erika Lye; Baú, Lucy Mara Silva; Buso, Sandro Artur; Bianchi, Marcos Cesar
2012-01-01
Ergonomic design is the adaptation of working conditions to human limitations and skills in the physical design phase of a new installation, a new working system, or new products or tools. Based on this concept, the purpose of this work was to analyze the implementation of ergonomic design at the new industrial units of an oil refinery, using the method of Ergonomic Workplace Assessment. This study was conducted by a multidisciplinary team composed of operation, maintenance and industrial safety technicians, ergonomists, designers and engineers. The analysis involved 6 production units, 1 industrial wastewater treatment unit, and 3 utilities units, all in the design detailing phase, for which 455 ergonomic requirements were identified. An analysis and characterization of the requirements identified for 5 of the production units, involving a total of 246 items, indicated that 62% were related to difficult access and blockage operations, while 15% were related to difficulties in the circulation of employees inside the units. Based on these data, it was found that the ergonomic requirements identified in the design detailing phase of an industrial unit involve physical ergonomics, and that it is very difficult to identify requirements related to organizational or cognitive ergonomics.
Search and rescue in Alaska's national parks.
Heggie, Travis W
2008-11-01
Recreational travel to wilderness destinations such as national parks is increasing. The inherent risks present in such destinations can result in injury and illness, have a significant impact on local medical resources, and end with expensive search and rescue operations. In order to increase our understanding of the activities and situations which lead to wilderness search and rescue incidents, this study examines search and rescue operations from National Park Service units in Alaska. A retrospective review of all search and rescue incident reports filed by National Park Service units in Alaska during 2002. During 2002 there were 25 reported search and rescue incidents involving 38 individuals. The majority of incidents (19 of 25) occurred at Denali National Park and Preserve. Thirteen fatalities were reported in six incidents, nine incidents involved traumatic injuries, eight involved illnesses, and two involved both injuries and an illness. Mountain climbing (20) and hiking (8) were the most common subject activities at the time search and rescue assistance was required. Climbing solo (4), uneven and wet terrain (4), falls into crevasses (3), and a lack of experience or ability (3) were the factors most commonly contributing to search and rescue incidents. Nineteen helicopters were utilized in 15 operations and fixed-wing aircraft were utilized in seven operations. Males accounted for 33 of the 38 individuals involved in all search and rescue incidents and United States citizens accounted for 74% of the individuals involved. The mountain environment higher than 4500m was the most common search and rescue environment (11). The average cost was USD $6253. Search and rescue operations in Alaska can be expensive and end with severe health consequences. Preventive education efforts at park visitor centers and at the lower and upper base camps on Mt. McKinley should be continued. In addition, pre-departure travel education efforts via the internet should be expanded for all park units and match the detail provided on the Denali National Park and Preserve website.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-06-01
This decision document presents the selected remedial action for the Glendale North Operable Unit, San Fernando Valley Area 2 Superfund site. The remedy involves groundwater extraction and treatment for the shallow aquifer system in the Glendale area of the San Fernando Valley.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-06-01
This decision document presents the selected remedial action for the Glendale South Operable Unit, San Fernando Valley Area 2 Superfund site. The remedy involves groundwater extraction and treatment for the shallow aquifer system in the Glendale area of the San Fernando Valley.
Sea Piracy in Southeast Asia: Implications for Countering Maritime Terrorism in the United States
2006-06-01
least ten agencies that have some involvement in maritime security management with nine authorized to conduct law enforcement operations at sea...exercises, cooperating on consequence management , and sustaining capacity building operations .173 The United States has important bilateral security...Overview and Evaluation,” Journal of Homeland Security and Emergency Management 2, no. 4 (2005). 221 Frittelli, “Terminal Operators ,” 2006, 3
Scheduling for Public Service in International Operations
NASA Technical Reports Server (NTRS)
Brenner, M. A.
1972-01-01
The factors involved in scheduling airline services for international operations are discussed. Charts are presented to show the transatlantic pattern of flights for a typical airline during the summer and winter months. The operations of a domestic airline operating overseas and a foreign airline operating to the United States are compared.
2012-09-01
the preservation of evidence or due process in mind. In contrast, police operations accept significant tacti- cal restraints military units...generally do not in order to assure due process and preserve evidence. A police action, such as an arrest, that involves maneuver and/or weapons is only...and the unique role they can play in the peace process . Resolution 1325, adopted in 2000, 9 holds a promise to women across the globe that their
NASA Technical Reports Server (NTRS)
Carl, J. G.; Furukawa, S.
1975-01-01
A manual is presented that provides basic technical documentation to support the operation and utilization of the Portable Ambulance Module (PAM) in the field. The PAM is designed to be used for emergency resuscitation and victim monitoring. The functions of all the controls, displays, and stowed equipment of the unit are defined. Supportive medical and physiological data in those areas directly related to the uses of the PAM unit are presented.
Forissier, R
1997-01-01
General Forissier, MO deals with a very particular problem which occurred within a short time period: the sanitary support units involvement in the large operations which took place in the semester back in 1958, during which the parachutists were opposed to units which were violently attempting to jump forcibly over a barrage which was still under construction. The article focuses on the respective losses inflicted on the forces involved and on the manner in which the evacuation of the wounded was undertaken.
Ventre, Kathleen M; Barry, James S; Davis, Deborah; Baiamonte, Veronica L; Wentworth, Allen C; Pietras, Michele; Coughlin, Liza; Barley, Gwyn
2014-04-01
Relocating obstetric (OB) services to a children's hospital imposes demands on facility operations, which must be met to ensure quality care and a satisfactory patient experience. We used in situ simulations to prospectively and iteratively evaluate operational readiness of a children's hospital-based OB unit before it opened for patient care. This project took place at a 314-bed, university-affiliated children's hospital. We developed 3 full-scale simulation scenarios depicting a concurrent maternal and neonatal emergency. One scenario began with a standardized patient experiencing admission; the mannequin portrayed a mother during delivery. We ran all 3 scenarios on 2 dates scheduled several weeks apart. We ran 2 of the scenarios on a third day to verify the reliability of key processes. During the simulations, content experts completed equipment checklists, and participants identified latent safety hazards. Each simulation involved a unique combination of scheduled participants who were supplemented by providers from responding ancillary services. The simulations involved 133 scheduled participants representing OB, neonatology, and anesthesiology. We exposed and addressed operational deficiencies involving equipment availability, staffing, interprofessional communication, and systems issues such as transfusion protocol failures and electronic order entry challenges. Process changes between simulation days 1 to 3 decreased the elapsed time between transfusion protocol activation and blood arrival to the operating room and labor/delivery/recovery/postpartum setting. In situ simulations identified multiple operational deficiencies on the OB unit, allowing us to take corrective action before its opening. This project may guide other children's hospitals regarding care processes likely to require significant focus and possible modification to accommodate an OB service.
Code of Federal Regulations, 2011 CFR
2011-04-01
... operations, all-cargo flight operations, and dual flight operations involving the transport of both cargo and... capacity required for normal operation and service of the flight. In addition, the definition of “crew...) Date of birth; (iii) Gender (F = female; M = male); (iv) Citizenship; (v) Country of residence; (vi...
Code of Federal Regulations, 2012 CFR
2012-04-01
... operations, all-cargo flight operations, and dual flight operations involving the transport of both cargo and... capacity required for normal operation and service of the flight. In addition, the definition of “crew...) Date of birth; (iii) Gender (F = female; M = male); (iv) Citizenship; (v) Country of residence; (vi...
Code of Federal Regulations, 2010 CFR
2010-04-01
... operations, all-cargo flight operations, and dual flight operations involving the transport of both cargo and... capacity required for normal operation and service of the flight. In addition, the definition of “crew...) Date of birth; (iii) Gender (F = female; M = male); (iv) Citizenship; (v) Country of residence; (vi...
Code of Federal Regulations, 2014 CFR
2014-04-01
... operations, all-cargo flight operations, and dual flight operations involving the transport of both cargo and... capacity required for normal operation and service of the flight. In addition, the definition of “crew...) Date of birth; (iii) Gender (F = female; M = male); (iv) Citizenship; (v) Country of residence; (vi...
Code of Federal Regulations, 2013 CFR
2013-04-01
... operations, all-cargo flight operations, and dual flight operations involving the transport of both cargo and... capacity required for normal operation and service of the flight. In addition, the definition of “crew...) Date of birth; (iii) Gender (F = female; M = male); (iv) Citizenship; (v) Country of residence; (vi...
ERIC Educational Resources Information Center
Snider, Richard G.
1985-01-01
The ratio factors approach involves recognizing a given fraction, then multiplying so that units cancel. This approach, which is grounded in concrete operational thinking patterns, provides a standard for science ratio and proportion problems. Examples are included for unit conversions, mole problems, molarity, speed/density problems, and…
Montana Curriculum Guidelines for Distributive Education. Revised.
ERIC Educational Resources Information Center
Harris, Ron, Ed.
These distributive education curriculum guidelines are intended to provide Montana teachers with teaching information for 11 units. Units cover introduction to marketing and distributive education, human relations and communications, operations and control, processes involved in buying for resale, merchandise handling, sales promotion, sales and…
Mental Health Advisory Team (MHAT) 6 -- Operation Enduring Freedom 2009 Afghanistan
2009-11-06
Mental Health Advisory Team (MHAT) 6 Operation Enduring Freedom 2009 Afghanistan 6 November 2009 Office o f the Command Surgeon US Forces...Afghanistan (USFOR-A) and Office o f The Surgeon General United States Army Medical Command The results and opinions presented in this report are...United States Army, or the Office of The Surgeon General. The MHAT 6 team would like to acknowledge the active involvement and in-theater support
Operating health analysis of electric power systems
NASA Astrophysics Data System (ADS)
Fotuhi-Firuzabad, Mahmud
The required level of operating reserve to be maintained by an electric power system can be determined using both deterministic and probabilistic techniques. Despite the obvious disadvantages of deterministic approaches there is still considerable reluctance to apply probabilistic techniques due to the difficulty of interpreting a single numerical risk index and the lack of sufficient information provided by a single index. A practical way to overcome difficulties is to embed deterministic considerations in the probabilistic indices in order to monitor the system well-being. The system well-being can be designated as healthy, marginal and at risk. The concept of system well-being is examined and extended in this thesis to cover the overall area of operating reserve assessment. Operating reserve evaluation involves the two distinctly different aspects of unit commitment and the dispatch of the committed units. Unit commitment health analysis involves the determination of which unit should be committed to satisfy the operating criteria. The concepts developed for unit commitment health, margin and risk are extended in this thesis to evaluate the response well-being of a generating system. A procedure is presented to determine the optimum dispatch of the committed units to satisfy the response criteria. The impact on the response wellbeing being of variations in the margin time, required regulating margin and load forecast uncertainty are illustrated. The effects on the response well-being of rapid start units, interruptible loads and postponable outages are also illustrated. System well-being is, in general, greatly improved by interconnection with other power systems. The well-being concepts are extended to evaluate the spinning reserve requirements in interconnected systems. The interconnected system unit commitment problem is decomposed into two subproblems in which unit scheduling is performed in each isolated system followed by interconnected system evaluation. A procedure is illustrated to determine the well-being indices of the overall interconnected system. Under normal operating conditions, the system may also be able to carry a limited amount of interruptible load on top of its firm load without violating the operating criterion. An energy based approach is presented to determine the optimum interruptible load carrying capability in both the isolated and interconnected systems. Composite system spinning reserve assessment and composite system well-being are also examined in this research work. The impacts on the composite well-being of operating reserve considerations such as stand-by units, interruptible loads and the physical locations of these resources are illustrated. It is expected that the well-being framework and the concepts developed in this research work will prove extremely useful in the new competitive utility environment.
36 CFR 228.15 - Operations within National Forest Wilderness.
Code of Federal Regulations, 2013 CFR
2013-07-01
...) The United States mining laws shall extend to each National Forest Wilderness for the period specified...) Holders of unpatented mining claims validly established on any National Forest Wilderness prior to... by the United States mining laws as then applicable to the National Forest land involved. Persons...
36 CFR 228.15 - Operations within National Forest Wilderness.
Code of Federal Regulations, 2012 CFR
2012-07-01
...) The United States mining laws shall extend to each National Forest Wilderness for the period specified...) Holders of unpatented mining claims validly established on any National Forest Wilderness prior to... by the United States mining laws as then applicable to the National Forest land involved. Persons...
36 CFR 228.15 - Operations within National Forest Wilderness.
Code of Federal Regulations, 2011 CFR
2011-07-01
...) The United States mining laws shall extend to each National Forest Wilderness for the period specified...) Holders of unpatented mining claims validly established on any National Forest Wilderness prior to... by the United States mining laws as then applicable to the National Forest land involved. Persons...
Operation Cobra: Organizational Pooling and Operational Art in the European Theater
2017-05-25
an organizational structure based on the idea of “task organizing” and “force pooling.” Task organizing involves the development of situation...essential equipment and personnel based on the day-to-day needs of that unit. A unit that carried enough bridging equipment or truck transport to...in two forms: MSC’s Afloat Pre-positioning Force (APF) and land- based pre-positioned equipment . In the APF, all ships are self-sustaining and have
Operator's manual on the visual-accumulation tube method for sedimentation analysis of sands
Colby, V.C.; Witzgman, F.W.
1958-01-01
The personnel who will be operating these units may have little or no previous knowledge of either the principles involved or the details of opera.ting procedure. This manual is intended as an aid to them in setting up the apparatus, learning the analytical procedure, interpreting the results, and understanding the primary principles encountered.
Risk Perception and Communication in Commercial Reusable Launch Vehicle Operations
NASA Astrophysics Data System (ADS)
Hardy, Terry L.
2005-12-01
A number of inventors and entrepreneurs are currently attempting to develop and commercially operate reusable launch vehicles to carry voluntary participants into space. The operation of these launch vehicles, however, produces safety risks to the crew, to the space flight participants, and to the uninvolved public. Risk communication therefore becomes increasingly important to assure that those involved in the flight understand the risk and that those who are not directly involved understand the personal impact of RLV operations on their lives. Those involved in the launch vehicle flight may perceive risk differently from those non-participants, and these differences in perception must be understood to effectively communicate this risk. This paper summarizes existing research in risk perception and communication and applies that research to commercial reusable launch vehicle operations. Risk communication is discussed in the context of requirements of United States law for informed consent from any space flight participants on reusable suborbital launch vehicles.
NASA Technical Reports Server (NTRS)
Matty, Christopher M.
2013-01-01
Controlling Carbon Dioxide (CO2) partial pressure in the habitable vehicle environment is a critical part of operations on the International Space Station (ISS). On the United States segment of ISS, CO2 levels are primarily controlled by the Carbon Dioxide Removal Assembly (CDRA). There are two CDRAs on ISS; one in the United States Laboratory module, and one in the Node3 module. CDRA has been through several significant operational issues, performance issues and subsequent re-design of various components, primarily involving the Desiccant Adsorbent Bed (DAB) assembly and Air Selector Valves (ASV). This paper will focus on significant operational and performance issues experienced by the CDRA team from 2008-2012.
Force Reduction Impacts on Resourcing Army Operational Requirements
2017-03-10
scenarios involving parametric changes to demand for and supply of manpower and equipment from the institutional Army. This type of mission- based ...i SPECIAL REPORT Force Reduction Impacts on Resourcing Army Operational Requirements By Dynamics Research Corporation In Partial... Research .................................................................................................. 12 2.1.2 Identifying and Collecting Unit
DOT National Transportation Integrated Search
2002-03-29
In 1998, the United States experienced nearly 400,000 crashes involving large trucks, resulting in approximately 5,000 deaths. Although new research (e.g., the Large Truck Crash Causation Project) is being planned by the Federal Motor Carrier Safety ...
Chesters, Adam; Grieve, Phillip H; Hodgetts, Timothy J
2014-04-01
The use of helicopter emergency medical services (HEMS) has increased substantially in the United Kingdom since 1987. There are currently no data on the rate of crashes and serious incidents related to HEMS in the United Kingdom. The aims of this article were to present data from a 26-year period since the start of HEMS operations in the United Kingdom and to compare them with published data from Germany, Australia, and the United States. Factors identified as affecting the safety of HEMS operations will also be discussed. A PubMed search was performed to retrieve published data on accident rates and safety discussions for international HEMS using the key words HEMS, helicopter, emergency medical services, accident, incident, and crash. The details of every helicopter crash in the United States since the beginning of HEMS operations was obtained and reviewed to identify those that involved HEMS aircraft. This novel UK information was compared with published data from three international systems. A total of 13 accidents or serious incidents involving HEMS aircraft were identified from Civil Aviation Authority records, only 1 of which was a fatal accident. It was estimated that approximately 230,000 HEMS missions occurred in the United Kingdom between 1987 and 2013, giving an absolute accident incidence of approximately 0.0057% and a fatal accident incidence of approximately 0.00043%. The accident and fatal accident rate per 10,000 missions in the United Kingdom was 0.57 and 0.04, respectively. This compares with published rates from Germany, Australia, and the United States with accident rate per 10,000 missions ranging between 0.57 and 0.75 and fatal accident rates per 10,000 missions ranging between 0.04 and 0.23. Accidents and serious incidents relating to HEMS operations in the United Kingdom have been comprehensively identified for the first time, allowing an estimation of overall accident and fatal accident rates and comparison with other countries' HEMS operations. Data collection and analysis were hampered by obscurity of data sources and poor availability of data. In a time of increasing HEMS use in the United Kingdom, it is essential to be mindful of safety, and standardization of data collection will improve focus in this important area.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-03
... Bar Nuclear Plant, Unit 1; Applications and Amendments to Facility Operating Licenses Involving... method for submitting comments on a specific subject): Federal Rulemaking Web site: Go to http://www... Rulemaking Web site: Go to http://www.regulations.gov and search for Docket ID NRC-2013-0109. NRC's...
2011-05-02
the 2011 National Military Strategy contend and numerous analysts posit, that the United States will continue to prosecute irregular warfare or a...think tank reports, and the ruminations of various luminaries that the United States will be involved in inegular wmfare throughout the remainder of
19 CFR 12.39 - Imported articles involving unfair methods of competition or practices.
Code of Federal Regulations, 2010 CFR
2010-04-01
... economically operated United States industry, or to restrain or monopolize trade and commerce in the United... the authorization or consent of the Government. (e) Importations of semiconductor chip products. (1) In accordance with the Semiconductor Chip Protection Act of 1984 (17 U.S.C. 901 et seq.), if the...
Involving service users in trials: developing a standard operating procedure
2013-01-01
Background Many funding bodies require researchers to actively involve service users in research to improve relevance, accountability and quality. Current guidance to researchers mainly discusses general principles. Formal guidance about how to involve service users operationally in the conduct of trials is lacking. We aimed to develop a standard operating procedure (SOP) to support researchers to involve service users in trials and rigorous studies. Methods Researchers with experience of involving service users and service users who were contributing to trials collaborated with the West Wales Organisation for Rigorous Trials in Health, a registered clinical trials unit, to develop the SOP. Drafts were prepared in a Task and Finish Group, reviewed by all co-authors and amendments made. Results We articulated core principles, which defined equality of service users with all other research team members and collaborative processes underpinning the SOP, plus guidance on how to achieve these. We developed a framework for involving service users in research that defined minimum levels of collaboration plus additional consultation and decision-making opportunities. We recommended service users be involved throughout the life of a trial, including planning and development, data collection, analysis and dissemination, and listed tasks for collaboration. We listed people responsible for involving service users in studies and promoting an inclusive culture. We advocate actively involving service users as early as possible in the research process, with a minimum of two on all formal trial groups and committees. We propose that researchers protect at least 1% of their total research budget as a minimum resource to involve service users and allow enough time to facilitate active involvement. Conclusions This SOP provides guidance to researchers to involve service users successfully in developing and conducting clinical trials and creating a culture of actively involving service users in research at all stages. The UK Clinical Research Collaboration should encourage clinical trials units actively to involve service users and research funders should provide sufficient funds and time for this in research grants. PMID:23866730
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-03
... the LSCS, Cycle 15, operation. Cycle 15 will be the first cycle of operation with a mixed core... methodologies. The analyses for LSCS, Unit 1, Cycle 15 have concluded that a two-loop MCPR SL of >= 1.13, based... accident from any accident previously evaluated? Response: No. The GNF2 fuel to be used in Cycle 15 is of a...
DOT National Transportation Integrated Search
2010-05-01
Surveys of 1420 intermodal transportation workers operating railroad equipment including mechanical and train yard and engine crafts from seven different locations throughout the western and eastern United States with various measures designed to ass...
2011-12-01
organized and equipped along the same lines as the French gendarmerie mobile, while its counter terrorism component is a replica of the French Groupe...first responders involved in disaster relief and homeland defense operations by providing geospatial intelligence data, products, and analyses.125 4...the impact of manmade and natural disasters .126 5. Service Intelligence Units The service intelligence units of the Army, Navy, Air Force, and
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-08-01
This report comprises appendices A--J which support the Y-12 Plant`s remedial action report involving Chestnut Ridge Operable Unit 2 (filled coal ash pond/Upper McCoy Branch). The appendices cover the following: Sampling fish from McCoy Branch; well and piezometer logs; ecological effects of contaminants in McCoy Branch 1989-1990; heavy metal bioaccumulation data; microbes in polluted sediments; and baseline human health risk assessment data.
Cosmonauts and astronauts during medical operations training
1994-06-11
Cosmonaut Vladimir N. Dezhurov (left), Mir 18 mission commander, among a group of Russians in the United States to participate in training for the joint Russia - United States space missions, conducts an intubation on a dummy. Dezhurov, along with Mir 18 flight engineer Gennadiy M. Strekalov (pictured) prepare for upcoming missions which involve crew members from the two nations.
48 CFR 915.404-4-71-4 - Considerations affecting fee amounts.
Code of Federal Regulations, 2012 CFR
2012-10-01
...—Manufacturing plants involving operations requiring a high degree of design layout or process control; nuclear reactors; atomic particle accelerators; complex laboratories or industrial units especially designed for...
48 CFR 915.404-4-71-4 - Considerations affecting fee amounts.
Code of Federal Regulations, 2014 CFR
2014-10-01
...—Manufacturing plants involving operations requiring a high degree of design layout or process control; nuclear reactors; atomic particle accelerators; complex laboratories or industrial units especially designed for...
48 CFR 915.404-4-71-4 - Considerations affecting fee amounts.
Code of Federal Regulations, 2010 CFR
2010-10-01
...—Manufacturing plants involving operations requiring a high degree of design layout or process control; nuclear reactors; atomic particle accelerators; complex laboratories or industrial units especially designed for...
48 CFR 915.404-4-71-4 - Considerations affecting fee amounts.
Code of Federal Regulations, 2011 CFR
2011-10-01
...—Manufacturing plants involving operations requiring a high degree of design layout or process control; nuclear reactors; atomic particle accelerators; complex laboratories or industrial units especially designed for...
48 CFR 915.404-4-71-4 - Considerations affecting fee amounts.
Code of Federal Regulations, 2013 CFR
2013-10-01
...—Manufacturing plants involving operations requiring a high degree of design layout or process control; nuclear reactors; atomic particle accelerators; complex laboratories or industrial units especially designed for...
DOT National Transportation Integrated Search
1999-04-01
Rural intelligent transportation systems (ITS) refers to that portion of the ITS program that focuses on travelers' and operators' needs in non-urbanized areas of the United States. As such, it involves interurban/interstate travel, small communities...
Nathan, Joseph P; Grossman, Sara; Zerilli, Tina; Pace, Adam
2018-02-01
To identify schools/colleges of pharmacy that own and operate a pharmacy and to gather key details about such pharmacies. Schools of pharmacy (n = 134) in the United States were contacted to determine whether they own and operate a pharmacy. Schools identified as having a pharmacy were subsequently sent an online questionnaire to solicit information about school and pharmacy characteristics. Eighteen (13.4%) schools reported owning and operating at least one pharmacy; of these, 14 (77.8%) responded to the questionnaire. The provision of education was a goal for all pharmacies. Pharmacy services were provided to students, faculty/staff, and community members (85.7%, 78.6%, and 50%, respectively). Student pharmacists were regularly involved in the operations of 13 (92.9%) pharmacies, largely as part of their introductory and advanced pharmacy practice experiences and/or as paid employees. Few schools of pharmacy in the United States own and operate a pharmacy. These pharmacies primarily serve as teaching and learning venues and provide services to the campus community and/or the community at large. Copyright © 2017 Elsevier Inc. All rights reserved.
Sillender, M
2006-01-01
Objective To determine the practice in UK hospitals regarding the level of patient involvement and consent when representatives of commercial surgical device manufacturers attend and advise during operations. Methods An anonymous postal questionnaire was sent to the senior nurse in charge in all 236 UK gynaecology theatres in 2004. 79/236 (33%) replies were received. Results Operating departments were visited every 2 weeks on average by a representative of the surgical device manufacturer. Actual operations were attended every 10 weeks, although there was much variation. 33/79 (42%) units consistently obtained patient consent for visits, usually orally, whereas 40/79 (51%) units did not. 65/79 (82%) units had no guidelines for surgical device representative visits. 91% of nurses in charge believed that there should be guidelines to protect both patients and staff. 6/79 (8%) units were preparing local guidelines at the time of the survey. Conclusions Currently, patient safety, confidentiality and autonomy are being protected by a minority of NHS operating theatres when surgical device representatives attend surgery. National guidelines would hopefully ensure that fully informed patient consent is obtained and that representatives are fully trained and supervised. PMID:16816038
Psychology in nuclear power plants: an integrative approach to safety - general statement
DOE Office of Scientific and Technical Information (OSTI.GOV)
Shikiar, R.
Since the accident at the Three Mile Island nuclear power plant on March 28, 1979, the commercial nuclear industry in the United States has paid increasing attention to the role of humans in overall plant safety. As the regulatory body with primary responsibility for ensuring public health and safety involving nuclear operations, the United States Nuclear Regulatory Commission (NRC) has also become increasingly involved with the ''human'' side of nuclear operations. The purpose of this symposium is to describe a major program of research and technical assistance that the Pacific Northwest Laboratory is performing for the NRC that deals withmore » the issues of safety at nuclear power plants (NPPs). This program addresses safety from several different levels of analysis, which are all important within the context of an integrative approach to system safety.« less
2013-09-01
involved in minimizing the real risks involved. All of these collateral damages could be easily avoided by rescheduling the arrival of the F- 35’s to a...room doctor, and nurses discussed the recent research on the health and cognitive risks associated with jet noise. This research shows not only that
47 CFR 90.475 - Operation of internal transmitter control systems in specially equipped systems.
Code of Federal Regulations, 2010 CFR
2010-10-01
... systems involving fixed systems whose base stations are controlled by such systems may automatically access these base stations through the microwave or operational fixed systems from positions in the PSTN, so long as the base stations and mobile units meet the requirements of § 90.483 and if a separate...
Cosmonauts and astronauts during medical operations training
1994-06-11
Cosmonaut Alexandr F. Poleshchuk (right) inventories medical supplies with Ezra D. Kucharz, medical operations trainer for Krug Life Sciences, Incorporated. Poleshchuk, a Mir reserve crew member, and a number of other cosmonauts and astronauts participating in the joint Russia - United States program were in Houston, Texas, to prepare for upcoming missions which involve crew members from the two nations.
United States nuclear tests, July 1945 through September 1992
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-12-01
This document lists chronologically and alphabetically by name all nuclear tests and simultaneous detonations conducted by the United States from July 1945 through September 1992. Several tests conducted during Operation Dominic involved missile launches from Johnston Atoll. Several of these missile launches were aborted, resulting in the destruction of the missile and nuclear device either on the pad or in the air.
Project summary: Application of a trailer-mounted slash bundler for southern logging
S. Meadows; T. Gallagher; D. Mitchell
2010-01-01
The John Deere bundler was originally designed to collect material behind a cutâtoâlength (CTL) operation, where the biomass feedstock is distributed across the harvested site. While the occurrence of a CTL operation is common in Europe, it is rarely used in the southern United States. Southern logging typically involves a treeâlength operation, where the whole tree is...
A comparison of the environmental impact of different AOPs: risk indexes.
Giménez, Jaime; Bayarri, Bernardí; González, Óscar; Malato, Sixto; Peral, José; Esplugas, Santiago
2014-12-31
Today, environmental impact associated with pollution treatment is a matter of great concern. A method is proposed for evaluating environmental risk associated with Advanced Oxidation Processes (AOPs) applied to wastewater treatment. The method is based on the type of pollution (wastewater, solids, air or soil) and on materials and energy consumption. An Environmental Risk Index (E), constructed from numerical criteria provided, is presented for environmental comparison of processes and/or operations. The Operation Environmental Risk Index (EOi) for each of the unit operations involved in the process and the Aspects Environmental Risk Index (EAj) for process conditions were also estimated. Relative indexes were calculated to evaluate the risk of each operation (E/NOP) or aspect (E/NAS) involved in the process, and the percentage of the maximum achievable for each operation and aspect was found. A practical application of the method is presented for two AOPs: photo-Fenton and heterogeneous photocatalysis with suspended TiO2 in Solarbox. The results report the environmental risks associated with each process, so that AOPs tested and the operations involved with them can be compared.
Sivakumar, Venkatasubramanian; Swaminathan, Gopalaraman; Rao, Paruchuri Gangadhar; Ramasami, Thirumalachari
2009-01-01
Ultrasound is a sound wave with a frequency above the human audible range of 16 Hz to 16 kHz. In recent years, numerous unit operations involving physical as well as chemical processes are reported to have been enhanced by ultrasonic irradiation. There have been benefits such as improvement in process efficiency, process time reduction, performing the processes under milder conditions and avoiding the use of some toxic chemicals to achieve cleaner processing. These could be a better way of augmentation for the processes as an advanced technique. The important point here is that ultrasonic irradiation is physical method activation rather than using chemical entities. Detailed studies have been made in the unit operations related to leather such as diffusion rate enhancement through porous leather matrix, cleaning, degreasing, tanning, dyeing, fatliquoring, oil-water emulsification process and solid-liquid tannin extraction from vegetable tanning materials as well as in precipitation reaction in wastewater treatment. The fundamental mechanism involved in these processes is ultrasonic cavitation in liquid media. In addition to this there also exist some process specific mechanisms for the enhancement of the processes. For instance, possible real-time reversible pore-size changes during ultrasound propagation through skin/leather matrix could be a reason for diffusion rate enhancement in leather processing as reported for the first time. Exhaustive scientific research work has been carried out in this area by our group working in Chemical Engineering Division of CLRI and most of these benefits have been proven with publications in valued peer-reviewed international journals. The overall results indicate that about 2-5-fold increase in the process efficiency due to ultrasound under the given process conditions for various unit operations with additional benefits. Scale-up studies are underway for converting these concepts in to a real viable larger scale operation. In the present paper, summary of our research findings from employing this technique in various unit operations such as cleaning, diffusion, emulsification, particle-size reduction, solid-liquid leaching (tannin and natural dye extraction) as well as precipitation has been presented.
Liquid-Phase Adsorption Fundamentals.
ERIC Educational Resources Information Center
Cooney, David O.
1987-01-01
Describes an experiment developed and used in the unit operations laboratory course at the University of Wyoming. Involves the liquid-phase adsorption of an organic compound from aqueous solution on activated carbon, and is relevant to adsorption processes in general. (TW)
Mukhopadhyay, Dhriti; Wiggins-Dohlvik, Katie C; MrDutt, Mary M; Hamaker, Jeffrey S; Machen, Graham L; Davis, Matthew L; Regner, Justin L; Smith, Randall W; Ciceri, David P; Shake, Jay G
2018-01-01
The transfer of critically ill patients from the operating room (OR) to the surgical intensive care unit (SICU) involves handoffs between multiple providers. Incomplete handoffs lead to poor communication, a major contributor to sentinel events. Our aim was to determine whether handoff standardization led to improvements in caregiver involvement and communication. A prospective intervention study was designed to observe thirty one patient handoffs from OR to SICU for 49 critical parameters including caregiver presence, peri-operative details, and time required to complete key steps. Following a six month implementation period, thirty one handoffs were observed to determine improvement. A significant improvement in presence of physician providers including intensivists and surgeons was observed (p = 0.0004 and p < 0.0001, respectively). Critical details were communicated more consistently, including procedure performed (p = 0.0048), complications (p < 0.0001), difficult airways (p < 0.0001), ventilator settings (p < 0.0001) and pressor requirements (p = 0.0134). Conversely, handoff duration did not increase significantly (p = 0.22). Implementation of a standardized protocol for handoffs between OR and SICU significantly improved caregiver involvement and reduced information omission without affecting provider time commitment. Copyright © 2017 Elsevier Inc. All rights reserved.
Acoustic Characterization of Compact Jet Engine Simulator Units
NASA Technical Reports Server (NTRS)
Doty, Michael J.; Haskin, Henry H.
2013-01-01
Two dual-stream, heated jet, Compact Jet Engine Simulator (CJES) units are designed for wind tunnel acoustic experiments involving a Hybrid Wing Body (HWB) vehicle. The newly fabricated CJES units are characterized with a series of acoustic and flowfield investigations to ensure successful operation with minimal rig noise. To limit simulator size, consistent with a 5.8% HWB model, the CJES units adapt Ultra Compact Combustor (UCC) technology developed at the Air Force Research Laboratory. Stable and controllable operation of the combustor is demonstrated using passive swirl air injection and backpressuring of the combustion chamber. Combustion instability tones are eliminated using nonuniform flow conditioners in conjunction with upstream screens. Through proper flow conditioning, rig noise is reduced by more than 20 dB over a broad spectral range, but it is not completely eliminated at high frequencies. The low-noise chevron nozzle concept designed for the HWB test shows expected acoustic benefits when installed on the CJES unit, and consistency between CJES units is shown to be within 0.5 dB OASPL.
2005-06-01
Afghanistan References Bryman A. The debate about quantitative and qualitative research : a question of method or epistemology. British Journal of...offers a significant advance over other assessment methods employed by civil affairs units. Involved units agreed that the process was well worth...1 Methods
Methodologies for processing plant material into acceptable food on a small scale
NASA Technical Reports Server (NTRS)
Parks, Thomas R.; Bindon, John N.; Bowles, Anthony J. G.; Golbitz, Peter; Lampi, Rauno A.; Marquardt, Robert F.
1994-01-01
Based on the Controlled Environment Life Support System (CELSS) production of only four crops, wheat, white potatoes, soybeans, and sweet potatoes; a crew size of twelve; a daily planting/harvesting regimen; and zero-gravity conditions, estimates were made on the quantity of food that would need to be grown to provide adequate nutrition; and the corresponding amount of biomass that would result. Projections were made of the various types of products that could be made from these crops, the unit operations that would be involved, and what menu capability these products could provide. Equipment requirements to perform these unit operations were screened to identify commercially available units capable of operating (or being modified to operate) under CELSS/zero-gravity conditions. Concept designs were developed for those equipment needs for which no suitable units were commercially available. Prototypes of selected concept designs were constructed and tested on a laboratory scale, as were selected commercially available units. This report discusses the practical considerations taken into account in the various design alternatives, some of the many product/process factors that relate to equipment development, and automation alternatives. Recommendations are made on both general and specific areas in which it was felt additional investigation would benefit CELSS missions.
Distraction and drowsiness in motorcoach drivers.
DOT National Transportation Integrated Search
2016-11-01
Despite the large number of motorcoaches in the United States, there has been limited research on motorcoach operations. With more than 15 billion miles traveled per year and the transport of millions of people, crashes, when they occur, can involve ...
1987-03-23
solution . Using the battalion training NCO, senior guidance counselor, operations NCO, SGM, XO and operations officer as trainers will assist both the... towsrd justification of additional advertising funds, if needed. SProviding a workable Total Army Involvement in Recruiting (TAIR) plan on a quarterly... solution to this problem. 0 Have your CLT visit local reserve canters for assistance in gaining access to schools. Many times, members of the reserve units
Absent Authority: Failure to Plan Funding and Command Authorities in USAF Security Assistance Units
2013-03-01
Warfare and Psychological Operations of the United States Air Force in Special Air Warfare (New York: Richards Rosen , 1969), 149. 73 Westermann...because we are naïve about the dangers we face, but because engagement can more durably lift suspicion and fear.” —President Barak Obama140...involved everyone from USSOCOM to AFSOC to the Embassy. While this worked for 140 Barak Obama
Petrushnko, Wilson; Perry, Will; Fraser-Kirk, Grant; Ctercteko, Grahame; Adusumilli, Sanjay; O'Grady, Gregory
2015-12-01
Fellowships in surgery are increasing in number, and concerns have been raised regarding their impact on resident training. Although fellows may contribute to resident education and training, they also compete for operative and other experience. This study aimed to quantify the impact of fellowships on resident training in a binational multispecialty cohort. The operative case volumes and primary operator rates of surgery trainees (residents) in Australia and New Zealand were compared between units with and without fellows. Trainees also were surveyed using Likert Scales to assess quality of operative and other experience in units with and without fellows. Data from 911 trainees over 2 terms was analyzed; survey response rate 42%. Of all trainees, 42% worked with fellows. Trainees in units without fellows were involved in more major (P = .03) and minor (P < .0001) cases. Primary operator rates were comparable, but trainees in units without fellows were less often assistants, reported an increased quality of elective operating experience, and reported more favorable completion of learning objectives (all P < .05). These findings were consistent between tertiary and nontertiary hospitals. Thematic analysis showed positive benefits of fellows in teaching, training and mentorship, but negative impacts on case exposure, competition for operating, and clinical experience. Fellows may assist in the teaching and training of residents, but residents working with fellows experience a decreased quantity of operative experience that may impact several aspects of the quality of training. Surgical educators must actively balance the learning needs of fellows and residents. Copyright © 2015 Elsevier Inc. All rights reserved.
Paradis, Elise; Leslie, Myles; Gropper, Michael A
2016-10-01
Morning interprofessional rounds (MIRs) are used in critical care medicine to improve team-based care and patient outcomes. Given existing evidence of conflict between and dissatisfaction among rounds participants, this study sought to better understand how the operational realities of care delivery in the intensive care unit (ICU) impact the success of MIRs. We conducted a year-long comparative ethnographic study of interprofessional collaboration and patient and family involvement in four ICUs in tertiary academic hospitals in two American cities. The study included 576 h of observation of team interactions, 47 shadowing sessions and 40 clinician interviews. In line with best practices in ethnographic research, data collection and analysis were done iteratively using the constant comparative method. Member check was conducted regularly throughout the project. MIRs were implemented on all units with the explicit goals of improving team-based and patient-centered care. Operational conditions on the units, despite interprofessional commitment and engagement, appeared to thwart ICU teams from achieving these goals. Specifically, time constraints, struggles over space, and conflicts between MIRs' educational and care-plan-development functions all prevented teams from achieving collaboration and patient-involvement. Moreover, physicians' de facto control of rounds often meant that they resembled medical rounds (their historical predecessors), and sidelined other providers' contributions. This study suggests that the MIRs model, as presently practiced, might not be well suited to the provision of team-based, patient-centered care. In the interest of interprofessional collaboration, of the optimization of clinicians' time, of high-quality medical education and of patient-centered care, further research on interprofessional rounds models is needed.
NASA Technical Reports Server (NTRS)
Feller, A.; Lombardi, T.
1978-01-01
Several approaches for implementing the register and multiplexer unit into two CMOS monolithic chip types were evaluated. The CMOS standard cell array technique was selected and implemented. Using this design automation technology, two LSI CMOS arrays were designed, fabricated, packaged, and tested for proper static, functional, and dynamic operation. One of the chip types, multiplexer register type 1, is fabricated on a 0.143 x 0.123 inch chip. It uses nine standard cell types for a total of 54 standard cells. This involves more than 350 transistors and has the functional equivalent of 111 gates. The second chip, multiplexer register type 2, is housed on a 0.12 x 0.12 inch die. It uses 13 standard cell types, for a total of 42 standard cells. It contains more than 300 transistors, the functional equivalent of 112 gates. All of the hermetically sealed units were initially screened for proper functional operation. The static leakage and the dynamic leakage were measured. Dynamic measurements were made and recorded. At 10 V, 14 megabit shifting rates were measured on multiplexer register type 1. At 5 V these units shifted data at a 6.6 MHz rate. The units were designed to operate over the 3 to 15 V operating range and over a temperature range of -55 to 125 C.
NASA Astrophysics Data System (ADS)
Demeis, Richard
1989-02-01
After the operational failure of a Solid Rocket Booster (SRB) led to the Space Shuttle Challenger accident, NASA reexamined the use of liquid-fueled units in place of the SRBs in order to ascertain whether they could improve safety and payload. In view of favorable study results obtained, the posibility has arisen of employing a common liquid rocket booster for the Space Shuttle, its cargo version ('Shuttle-C'), and the next-generation Advanced Launch System. The system envisioned would involve two booster units, whose four engines/unit would be fed by integral LOX and kerosene tanks. Mission aborts with one-booster unit and two-unit failures would not be catastrophic, and would respectively allow LEO or an emergency landing in Africa.
7 CFR 1467.15 - Violations and remedies.
Code of Federal Regulations, 2011 CFR
2011-01-01
... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS WETLANDS RESERVE PROGRAM § 1467.15 Violations... contract, or any restoration cost-share agreement involving the participant, the participant shall be given... important wetland functions and values or other rights of the United States under the easement. The...
7 CFR 1467.15 - Violations and remedies.
Code of Federal Regulations, 2010 CFR
2010-01-01
... OF AGRICULTURE LOANS, PURCHASES, AND OTHER OPERATIONS WETLANDS RESERVE PROGRAM § 1467.15 Violations... contract, or any restoration cost-share agreement involving the participant, the participant shall be given... important wetland functions and values or other rights of the United States under the easement. The...
Kerr, Robert R; Grayden, David B; Thomas, Doreen A; Gilson, Matthieu; Burkitt, Anthony N
2014-01-01
The brain is able to flexibly select behaviors that adapt to both its environment and its present goals. This cognitive control is understood to occur within the hierarchy of the cortex and relies strongly on the prefrontal and premotor cortices, which sit at the top of this hierarchy. Pyramidal neurons, the principal neurons in the cortex, have been observed to exhibit much stronger responses when they receive inputs at their soma/basal dendrites that are coincident with inputs at their apical dendrites. This corresponds to inputs from both lower-order regions (feedforward) and higher-order regions (feedback), respectively. In addition to this, coherence between oscillations, such as gamma oscillations, in different neuronal groups has been proposed to modulate and route communication in the brain. In this paper, we develop a simple, but novel, neural mass model in which cortical units (or ensembles) exhibit gamma oscillations when they receive coherent oscillatory inputs from both feedforward and feedback connections. By forming these units into circuits that can perform logic operations, we identify the different ways in which operations can be initiated and manipulated by top-down feedback. We demonstrate that more sophisticated and flexible top-down control is possible when the gain of units is modulated by not only top-down feedback but by coherence between the activities of the oscillating units. With these types of units, it is possible to not only add units to, or remove units from, a higher-level unit's logic operation using top-down feedback, but also to modify the type of role that a unit plays in the operation. Finally, we explore how different network properties affect top-down control and processing in large networks. Based on this, we make predictions about the likely connectivities between certain brain regions that have been experimentally observed to be involved in goal-directed behavior and top-down attention.
Kerr, Robert R.; Grayden, David B.; Thomas, Doreen A.; Gilson, Matthieu; Burkitt, Anthony N.
2014-01-01
The brain is able to flexibly select behaviors that adapt to both its environment and its present goals. This cognitive control is understood to occur within the hierarchy of the cortex and relies strongly on the prefrontal and premotor cortices, which sit at the top of this hierarchy. Pyramidal neurons, the principal neurons in the cortex, have been observed to exhibit much stronger responses when they receive inputs at their soma/basal dendrites that are coincident with inputs at their apical dendrites. This corresponds to inputs from both lower-order regions (feedforward) and higher-order regions (feedback), respectively. In addition to this, coherence between oscillations, such as gamma oscillations, in different neuronal groups has been proposed to modulate and route communication in the brain. In this paper, we develop a simple, but novel, neural mass model in which cortical units (or ensembles) exhibit gamma oscillations when they receive coherent oscillatory inputs from both feedforward and feedback connections. By forming these units into circuits that can perform logic operations, we identify the different ways in which operations can be initiated and manipulated by top-down feedback. We demonstrate that more sophisticated and flexible top-down control is possible when the gain of units is modulated by not only top-down feedback but by coherence between the activities of the oscillating units. With these types of units, it is possible to not only add units to, or remove units from, a higher-level unit's logic operation using top-down feedback, but also to modify the type of role that a unit plays in the operation. Finally, we explore how different network properties affect top-down control and processing in large networks. Based on this, we make predictions about the likely connectivities between certain brain regions that have been experimentally observed to be involved in goal-directed behavior and top-down attention. PMID:25152715
NASA Technical Reports Server (NTRS)
Fatig, Curtis; Ochs, William; Johns, Alan; Seaton, Bonita; Adams, Cynthia; Wasiak, Francis; Jones, Ronald; Jackson, Wallace
2012-01-01
The James Webb Space Telescope (JWST) Project has an extended integration and test (I&T) phase due to long procurement and development times of various components as well as recent launch delays. The JWST Ground Segment and Operations group has developed a roadmap of the various ground and flight elements and their use in the various JWST I&T test programs. The JWST Project s building block approach to the eventual operational systems, while not new, is complex and challenging; a large-scale mission like JWST involves international partners, many vendors across the United States, and competing needs for the same systems. One of the challenges is resource balancing so simulators and flight products for various elements congeal into integrated systems used for I&T and flight operations activities. This building block approach to an incremental buildup provides for early problem identification with simulators and exercises the flight operations systems, products, and interfaces during the JWST I&T test programs. The JWST Project has completed some early I&T with the simulators, engineering models and some components of the operational ground system. The JWST Project is testing the various flight units as they are delivered and will continue to do so for the entire flight and operational system. The JWST Project has already and will continue to reap the value of the building block approach on the road to launch and flight operations.
The United States national volcanic ash operations plan for aviation
Albersheim, Steven; Guffanti, Marianne
2009-01-01
Volcanic-ash clouds are a known hazard to aviation, requiring that aircraft be warned away from ash-contaminated airspace. The exposure of aviation to potential hazards from volcanoes in the United States is significant. In support of existing interagency operations to detect and track volcanic-ash clouds, the United States has prepared a National Volcanic Ash Operations Plan for Aviation to strengthen the warning process in its airspace. The US National Plan documents the responsibilities, communication protocols, and prescribed hazard messages of the Federal Aviation Administration, National Oceanic and Atmospheric Administration, US Geological Survey, and Air Force Weather Agency. The plan introduces a new message format, a Volcano Observatory Notice for Aviation, to provide clear, concise information about volcanic activity, including precursory unrest, to air-traffic controllers (for use in Notices to Airmen) and other aviation users. The plan is online at http://www.ofcm.gov/p35-nvaopa/pdf/FCM-P35-2007-NVAOPA.pdf. While the plan provides general operational practices, it remains the responsibility of the federal agencies involved to implement the described procedures through orders, directives, etc. Since the plan mirrors global guidelines of the International Civil Aviation Organization, it also provides an example that could be adapted by other countries.
Industrial robots in Europe - market, applications and developments
NASA Technical Reports Server (NTRS)
Schraft, R. D.
1975-01-01
Different companies involving a wide range of products and manufacturing processes were studied to define the requirements for industrial robots. A survey of all such automatic units offered on the world market was made to establish a data base. Principal applications include coating, spot welding, and loading and unloading operations.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-21
... information barriers, that operate to prevent one trading unit from obtaining knowledge of customer orders... respect to customer orders involving securities for which there is limited pricing information or... Change Relating to Trading Ahead of Customer Orders and Best Execution and Interpositioning Requirements...
Emergency Preparedness: Are You Ready?
ERIC Educational Resources Information Center
Harley, Lorraine
2012-01-01
Most Americans who consider emergency preparedness think of someone or another country attacking the United States. Most newspaper and televised accounts involve community leaders and policymakers preparing for a terrorist attack. However, anyone who operates a child care center, family child care home, or has children of her own, knows that…
Dimensions of Immigrant Integration and Civic Engagement: Issues and Exemplary Programs
ERIC Educational Resources Information Center
Wrigley, Heide Spruck
2012-01-01
Immigrant integration is a multidimensional process that involves both newcomers and the receiving community. Although the United States does not have a coherent policy of immigrant integration, several city- and state-wide efforts support immigrant integration, as do individual initiatives operating across states. In this article, the author…
ASPEN Plus in the Chemical Engineering Curriculum: Suitable Course Content and Teaching Methodology
ERIC Educational Resources Information Center
Rockstraw, David A.
2005-01-01
An established methodology involving the sequential presentation of five skills on ASPEN Plus to undergraduate seniors majoring in ChE is presented in this document: (1) specifying unit operations; (2) manipulating physical properties; (3) accessing variables; (4) specifying nonstandard components; and (5) applying advanced features. This…
Transportation and the Mentally Retarded.
ERIC Educational Resources Information Center
President's Committee on Mental Retardation, Washington, DC.
Reported were the results of a contract that involved identification, description, and categorization of the nature of transportation problems for the mentally retarded by means of analysis of existing studies, two surveys, and an inventory of specialized programs and systems operating in the United States. One major problem was found to be…
Martin, Edward J [Virginia Beach, VA
2008-01-15
A voltage verification unit and method for determining the absence of potentially dangerous potentials within a power supply enclosure without Mode 2 work is disclosed. With this device and method, a qualified worker, following a relatively simple protocol that involves a function test (hot, cold, hot) of the voltage verification unit before Lock Out/Tag Out and, and once the Lock Out/Tag Out is completed, testing or "trying" by simply reading a display on the voltage verification unit can be accomplished without exposure of the operator to the interior of the voltage supply enclosure. According to a preferred embodiment, the voltage verification unit includes test leads to allow diagnostics with other meters, without the necessity of accessing potentially dangerous bus bars or the like.
Journal of Special Operations Medicine. Volume 4, Edition 3, Summer 2004
2004-01-01
several ways for you to obtain the Journal of Special Operations Medicine (JSOM). USSOCOM-SG distributes the JSOM to all our SOF units and our active ...training in the Philippines Volume 4, Edition 3 / Summer 04 1 From the Surgeon Kudos One of SOF’s most distinguished members has just received a...of this educa- tional activity . OBJECTIVES 1. Discuss the steps involved in rapid sequence induction. 2. Identify medications used in rapid
Spacecraft servicing demonstration plan
NASA Technical Reports Server (NTRS)
Bergonz, F. H.; Bulboaca, M. A.; Derocher, W. L., Jr.
1984-01-01
A preliminary spacecraft servicing demonstration plan is prepared which leads to a fully verified operational on-orbit servicing system based on the module exchange, refueling, and resupply technologies. The resulting system can be applied at the space station, in low Earth orbit with an orbital maneuvering vehicle (OMV), or be carried with an OMV to geosynchronous orbit by an orbital transfer vehicle. The three phase plan includes ground demonstrations, cargo bay demonstrations, and free flight verifications. The plan emphasizes the exchange of multimission modular spacecraft (MMS) modules which involves space repairable satellites. Three servicer mechanism configurations are the engineering test unit, a protoflight quality unit, and two fully operational units that have been qualified and documented for use in free flight verification activity. The plan balances costs and risks by overlapping study phases, utilizing existing equipment for ground demonstrations, maximizing use of existing MMS equipment, and rental of a spacecraft bus.
Transforming a conventional theatre into a gynaecological endoscopy unit.
Anastasakis, E; Protopapas, A; Daskalakis, G; Papadakis, M; Milingos, S; Antsaklis, A
2007-01-01
Most minimally invasive procedures are now performed in operating rooms that were originally designed for traditional open surgery. We designed an endoscopic theatre based on our experience with special features specific for gynaecological endoscopy. We designed a detailed plan with an architect's aid of a gynaecological unit (based on a Greek presidential decree published in 1991). The space utilized was that of a conventional theatre. With the architectural plan we anticipated every area needed in a gynaecological endoscopic theatre. A twin theatre was considered appropriate in order for the surgical team to operate alternatively in one theatre while the other is being cleaned and prepared for use. The design of a unit dedicated to gynaecologic laparoscopy is a multidisciplinary task where the endoscopic surgeon undertakes an active and prominent role. It is a project with great benefits and rewards for all parties involved. We present our design for evaluation.
Employment of Direct Fire Systems during Offensive Operations
1990-06-01
problems, this criteria suffers from a lack of offensive direct fire planning as part 115 of the scheme of maneuver. Limited TTP discussion in the...these specific occurrences. Doctrine writers could develop TTP to do so. This problem could involve unit training practices. If units differentiate ...10 0 0 0 5 PURPOSE) 4. - IDENTIFIES DIRECT FIRE I 76 15 20 130 21 15 115 R&S PRIORITY (PIR/IR) 5. - IDENTIFIES ENGAGEMENT 1 5 10 0 25 16 0 0 PRIORITY
Outcomes of Bacteremia in Burn Patients Involved in Combat Operations Overseas
2008-03-01
MD, Mark S Rasnake, MD, Duane R Hospenthal, MD, PhD, FACP, Steven E Wolf, MD, FACS BACKGROUND: Burn patients constitute approximately 5% of...GRANT NUMBER 5c. PROGRAM ELEMENT NUMBER 6. AUTHOR( S ) Ressner R. A., Murray C. K., Griffith M. E., Rasnake M. S ., Hospenthal D. R., Wolf S . E...5d. PROJECT NUMBER 5e. TASK NUMBER 5f. WORK UNIT NUMBER 7. PERFORMING ORGANIZATION NAME( S ) AND ADDRESS(ES) United States Army Institute of Surgical
Cryogenics Testbed Laboratory Flange Baseline Configuration
NASA Technical Reports Server (NTRS)
Acuna, Marie Lei Ysabel D.
2013-01-01
As an intern at Kennedy Space Center (KSC), I was involved in research for the Fluids and Propulsion Division of the NASA Engineering (NE) Directorate. I was immersed in the Integrated Ground Operations Demonstration Units (IGODU) project for the majority of my time at KSC, primarily with the Ground Operations Demonstration Unit Liquid Oxygen (GODU L02) branch of IGODU. This project was established to develop advancements in cryogenic systems as a part of KSC's Advanced Exploration Systems (AES) program. The vision of AES is to develop new approaches for human exploration, and operations in and beyond low Earth orbit. Advanced cryogenic systems are crucial to minimize the consumable losses of cryogenic propellants, develop higher performance launch vehicles, and decrease operations cost for future launch programs. During my internship, I conducted a flange torque tracking study that established a baseline configuration for the flanges in the Simulated Propellant Loading System (SPLS) at the KSC Cryogenics Test Laboratory (CTL) - the testing environment for GODU L02.
Development of the Integrated Biomass Supply Analysis and Logistics Model (IBSAL)
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sokhansanj, Shahabaddine; Webb, Erin; Turhollow Jr, Anthony F
2008-06-01
The Integrated Biomass Supply & Logistics (IBSAL) model is a dynamic (time dependent) model of operations that involve collection, harvest, storage, preprocessing, and transportation of feedstock for use at a biorefinery. The model uses mathematical equations to represent individual unit operations. These unit operations can be assembled by the user to represent the working rate of equipment and queues to represent storage at facilities. The model calculates itemized costs, energy input, and carbon emissions. It estimates resource requirements and operational characteristics of the entire supply infrastructure. Weather plays an important role in biomass management and thus in IBSAL, dictating themore » moisture content of biomass and whether or not it can be harvested on a given day. The model calculates net biomass yield based on a soil conservation allowance (for crop residue) and dry matter losses during harvest and storage. This publication outlines the development of the model and provides examples of corn stover harvest and logistics.« less
Hemrich, Günter
2005-06-01
This case study reviews the experience of the Somalia Food Security Assessment Unit (FSAU) of operating a food security information system in the context of a complex emergency. In particular, it explores the linkages between selected features of the protracted crisis environment in Somalia and conceptual and operational aspects of food security information work. The paper specifically examines the implications of context characteristics for the establishment and operations of the FSAU field monitoring component and for the interface with information users and their diverse information needs. It also analyses the scope for linking food security and nutrition analysis and looks at the role of conflict and gender analysis in food security assessment work. Background data on the food security situation in Somalia and an overview of some key features of the FSAU set the scene for the case study. The paper is targeted at those involved in designing, operating and funding food security information activities.
Scott, Nicholas B; McDonald, David; Campbell, Jane; Smith, Richard D; Carey, A Kate; Johnston, Ian G; James, Kate R; Breusch, Steffen J
2013-01-01
To establish whether a nationally guided programme can lead to more widespread implementation of enhanced recovery after surgery (ERAS), a well-established optimised care pathway for lower limb arthroplasty. In 2010, National Services Scotland's Musculoskeletal Audit was asked to perform a 'snapshot' audit of the current peri-operative management of patients undergoing total hip and knee arthroplasty in all 22 Scottish orthopaedic units with an identical follow-up audit in 2011 after input and support from the national steering group. Audit 1 and audit 2 involved 1,345 and 1,278 patients, respectively. The number of Scottish units that developed an ERAS programme increased from 8 (36 %) to 15 (68 %). Units that included more ERAS patients had earlier mobilisation rates (146/474, 36 % ERAS patients mobilised same day vs. 34/873, 4 % non-ERAS; n = 22 units, r = 0.55, p = 0.008) and shorter post-operative length of stay (median 4 days vs. ERAS, 5 days non-ERAS, n = 22 units, r = -0.64, p = 0.001). ERAS knee arthroplasty patients had lower blood transfusion rates (5/205, 2 % vs. 51/399, 13 %, n = 22 units, r = -0.62, p = 0.002). Units that restricted the use of IV fluids post-operatively had higher early mobilisation rates (n = 22 units, r = 0.48, p = 0.03) and shorter post-operative length of stay (n = 22 units, r = -0.56, p = 0.007). Reduced use of patient-controlled analgesia was also associated with earlier mobilisation (n = 22 units, r = 0.49, p = 0.02) and shorter length of stay (n = 22 units, r = -0.39, p = 0.07). Urinary catheterisation rates also dropped from 468/1,345 (35 %) in 2010 to 337/1,278 (26 %) in 2011 (n = 22 units, z = 2.19, p = 0.03). A clinically guided and nationally supported process has proven highly successful in achieving a further uptake of enhanced recovery principles after lower limb arthroplasty in Scotland, which has resulted in clinical benefits to patients and reduced length of hospital stay.
Design of experiments applications in bioprocessing: concepts and approach.
Kumar, Vijesh; Bhalla, Akriti; Rathore, Anurag S
2014-01-01
Most biotechnology unit operations are complex in nature with numerous process variables, feed material attributes, and raw material attributes that can have significant impact on the performance of the process. Design of experiments (DOE)-based approach offers a solution to this conundrum and allows for an efficient estimation of the main effects and the interactions with minimal number of experiments. Numerous publications illustrate application of DOE towards development of different bioprocessing unit operations. However, a systematic approach for evaluation of the different DOE designs and for choosing the optimal design for a given application has not been published yet. Through this work we have compared the I-optimal and D-optimal designs to the commonly used central composite and Box-Behnken designs for bioprocess applications. A systematic methodology is proposed for construction of the model and for precise prediction of the responses for the three case studies involving some of the commonly used unit operations in downstream processing. Use of Akaike information criterion for model selection has been examined and found to be suitable for the applications under consideration. © 2013 American Institute of Chemical Engineers.
Sub-orbital commercial Human space flight and informed consent in the United States
NASA Astrophysics Data System (ADS)
Carminati, Maria-Vittoria « Giugi »; Griffith, Doug; Campbell, Mark R.
2013-12-01
Commercial space flight is expected to rapidly develop in the near future. This will begin with sub-orbital missions and then progress to orbital flights. In the United States, technical informed consent of space flight participants is required by the commercial space flight operator for regulatory purposes. Additionally, though not required by U.S. regulation, the aerospace medicine professional involved in the medical screening of both space flight participants and crewmembers will be asked to assist operators in obtaining medical informed consent for liability purposes. The various US federal and state regulations regarding informed consent for sub-orbital commercial space flight are evolving and are unfamiliar to most aerospace medical professionals and are reviewed and discussed.
Increased flight surgeon role in military aeromedical evacuation.
Lyons, T J; Connor, S B
1995-10-01
Physicians were involved in the development of aeromedical evacuation (medevac) and flight surgeons flew as crewmembers on the first U.S. military medevac flights. However, since World War II flight surgeons have not been routinely assigned to operational medevac units. The aeromedical literature addressing the role of physicians in medevac is controversial. Recent contingencies involving the U.S. Air Force (USAF) have required the augmentation of medevac units with flight surgeons. Beginning in 1992, the United States Air Forces Europe (USAFE) assigned three flight surgeons to the medevac squadron. Between 2 February 1993 and 24 March 1994 USAFE moved 241 patients on 29 missions out of the former Yugoslavia--most of these missions had a flight surgeon on the crew. Because advance medical information on the status of these patients is often nonexistent, the presence of a physician on the crew proved life-saving in some instances. In peacetime operations, there has been a recent trend in the European theater for the USAF to move more unstable patients. Dedicated medevac flight surgeons have proven to have the specific experience and training to perform effectively in the role of in-flight medical attendant. In addition, they are effective in negotiating with referring physicians about the urgency of movement, required equipment, the need for medical attendants, etc. These flight surgeons also provide medical coverage of transiting patients in the Aeromedical Staging Flight (ASF), thus providing needed continuity in the medevac system. Dedicated medevac flight surgeons fill a unique and valuable role in medevac systems. Agencies with medevac units should consider assigning flight surgeons to these units.
1980-06-01
PROSPECTIVE STUDY OF PREGNANCY’ OUTCOMES OF OPERATING ROOM NURSES AND NURSE ANESTHETISTS OCCUPATIONALLY EXPOSED TO WASTE ANESTHETIC GASES AS COMPARED O TO...tionally Exposed to Waste Anesthetic Gases 6 Pt NFONMING 0 i REP"ORT NUMBER as Cor - p4~~ oP ciar~_Njssi Ruth L. Nancarrow 9 PERFONMtNG OI-GANIZATION...human factors involved in the control of waste anesthetic gases in the operating room; Lt. Colonel Phyllis Goins, Chief, Educa- tional Methodology
ERIC Educational Resources Information Center
Congress of the U.S., Washington, DC. House.
This publication consists of the contents of a hearing before a subcommittee of the committee on government operations of the United States House of Representatives. The hearing was conducted during the second session of the ninety-first congress in September of 1970. The primary purpose of this hearing was to investigate Federal responsibility in…
DOE Office of Scientific and Technical Information (OSTI.GOV)
Pelloux-Prayer, D.; Rottenberg, J.; Ours, A.
1982-01-01
Studies have shown that the dry type of condensation boiler offers substantial energy savings in residential space heating. For collective heating, laboratory efficiencies of 85-95% were confirmed in the field by a condensation boiler operating in a 75-unit apartment house. Compared with conventional boilers, the condensation type uses 15-21% less energy. Retrofitting existing boilers involves routing the flue gas through a heat exchanger placed in the return-water system and providing drainage for the condensates.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-27
... United States (HTS). The goods involved include certain sensitized photographic film, video game console... chapter 37, and (2) Providing specifically for cordless video game console controllers which use infrared... ``; cordless video game console controllers which use infrared transmissions to operate or access the various...
40 CFR 78.12 - Standard of review.
Code of Federal Regulations, 2011 CFR
2011-07-01
... section, the petitioner shall have the burden of going forward and of persuasion to show that a finding of... review. (2) The owners and operators of the source or unit involved shall have the burden of persuasion... basis for the decision. The petitioner shall have the burden of persuasion to show that a finding of...
Numbers and Policy in Care for People with Intellectual Disability in the United Kingdom
ERIC Educational Resources Information Center
Glover, Gyles
2015-01-01
Background: Statements or commitments making use of numbers have an important place in government policy. They appear at all stages of the policy process: campaigning, formulation, monitoring and evaluation. Many types of sources are involved including research studies, national survey information, routine operational data collections and special…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-25
...: You may access information and comment submissions related to this document, which the NRC possesses... access information related to this document, which the NRC possesses and are publicly available, by any... generation and the potential for stainless steel stress corrosion cracking is reduced. Therefore, the...
Division in a Binary Representation for Complex Numbers
ERIC Educational Resources Information Center
Blest, David C.; Jamil, Tariq
2003-01-01
Computer operations involving complex numbers, essential in such applications as Fourier transforms or image processing, are normally performed in a "divide-and-conquer" approach dealing separately with real and imaginary parts. A number of proposals have treated complex numbers as a single unit but all have foundered on the problem of the…
ASIC For Complex Fixed-Point Arithmetic
NASA Technical Reports Server (NTRS)
Petilli, Stephen G.; Grimm, Michael J.; Olson, Erlend M.
1995-01-01
Application-specific integrated circuit (ASIC) performs 24-bit, fixed-point arithmetic operations on arrays of complex-valued input data. High-performance, wide-band arithmetic logic unit (ALU) designed for use in computing fast Fourier transforms (FFTs) and for performing ditigal filtering functions. Other applications include general computations involved in analysis of spectra and digital signal processing.
Ergonomics in industrialized dairy operations.
Douphrate, David I; Nonnenmann, Matthew W; Rosecrance, John C
2009-01-01
This paper presents a summary of a panel presentation by agriculture health and safety scientists on ergonomics of industrialized dairy parlor operations in the United States. Dairy industry trends in the United States were discussed in the panel presentation, which took place during the New Paths: Health and Safety in Western Agriculture conference, November 11-13, 2008. Dairy production is steadily moving to large-herd operations because of associated economies of scale and other economic and social conditions. Large-herd operations utilize a parlor milking system, as compared to a stanchion system used primarily in smaller operations. Each milking system presents different risks for worker injury. Low back, knee, and shoulder musculoskeletal symptoms were most frequently reported among workers in smaller dairy operations. Another study analyzing workers' compensation (WC) data from large-herd milking operations found nearly 50% of livestock-handling injury claims involved parlor milking activities. Nearly 27% of injuries were to the wrist, hand, and fingers, nearly 13% to the head or face, and 11% to the chest. Results indicated the vulnerability of these body parts to injury due to the worker-livestock interface during milking. More focused research should investigate milking practices and parlor designs as they relate to worker safety and health. Additional dairy-related injury research is vital given the trend towards large industrial milking operations.
NASA Technical Reports Server (NTRS)
Howard, Robert L., Jr.
2012-01-01
As NASA develops missions to leave Earth orbit and explore distant destinations (Mars, Moon, Asteroids) it is necessary to rethink human spaceflight paradigms in the life sciences. Standards developed for low earth orbit human spaceflight may not be fully applicable and in-space research may be required to develop new standards. Preventative and emergency medical care may require new capabilities never before used in space. Due to spacecraft volume limitations, this work area may also be shared with various animal and plant life science research. This paper explores the prototype Medical Operations Workstation within the NASA Habitat Demonstration Unit and discusses some of the lessons learned from field analogue missions involving the workstation. Keywords: Exploration, medical, health, crew, injury emergency, biology, animal, plant, science, preventative, emergency.
1984-11-01
the military and civilian agencies involved because of the pronounced anti- social behavior of a large number of the refugees in the ...mission during the Korean War. It points out the impact of this extended support mission on the overall readiness of FORSCOM’s participating Active ani...Provost Marshal’s Office; and Mr. R. W. Wagner and SGM(Ret) S . J. Maxwell, FORSCOM Office of the Deputy Chief of Staff for Operations, for their
ERIC Educational Resources Information Center
Supreme Court of the U. S., Washington, DC.
In this landmark educational finance opinion (presented here in full) the U.S. Supreme Court held that the Texas case was not a proper case in which to examine a State's laws under standards of strict judicial scrutiny. That test, according to the Court, is reserved for cases involving laws that operate to the disadvantage of suspect classes or…
Current Status Of Ergonomic Standards
NASA Astrophysics Data System (ADS)
Lynch, Gene
1984-05-01
The last five years have seen the development and adoption of new kinds of standards for the display industry. This standardization activity deals with the complex human computer interface. Here the concerns involve health, safety, productivity, and operator well-being. The standards attempt to specify the "proper" use of visual display units. There is a wide range of implications for the display industry - as manufacturers of displays, as employers, and as users of visual display units. In this paper we examine the development of these standards, their impact on the display industry and implications for the future.
Peritonitis: 10 years' experience in a single surgical unit.
Agarwal, Nitin; Saha, Sudipta; Srivastava, Anurag; Chumber, Sunil; Dhar, Anita; Garg, Sanket
2007-01-01
Peritonitis secondary to gut perforation is still one of the commonest surgical emergencies in India and is associated with high morbidity and mortality. The present study examines the aetiology and outcome of peritonitis cases operated on in our surgical unit, and compares our findings with those of previous studies performed between 1981 and 1991. A retrospective study of 260 peritonitis patients operated on in a single surgical unit from 1995 to 2006 was done and data involving clinical presentation, operative findings and post-operative course were studied and analysed. Causes of peritonitis were small bowel perforation (96 ileal, 17 jejunal), peptic perforation (45 duodenal, 16 gastric), appendicular perforation (36), primary peritonitis (8), and others (42). The incidence of major complications was 25% (burst-11%, leak-5%, intraabdominal abscess-5%, multi-organ failure-6.5%). The overall mortality was 10%. High mortality was observed in jejunal, gall bladder and liver abscess perforation cases (> 20%). Histopathological evaluation (143 specimens) revealed tuberculosis in 42 (mostly small bowel), malignancy in 8, and inflammation in the rest. Comparisons with a similar study carried out in the same unit and published in 1995 revealed similar demographic features and mortality, but a change in the most common cause (peptic ulcer perforation to small bowel perforation), and an increased performance of enterostomy compared with primary repair in small bowel perforation and a decrease in the leak rate (13% to 4%). Small bowel perforation is the commonest form of perforation and the mortality rate associated with peritonitis remains unchanged.
Lessons Learned and Lessons To Be Learned: An Overview of Innovative Network Learning Environments.
ERIC Educational Resources Information Center
Jacobson, Michael J.; Jacobson, Phoebe Chen
This paper provides an overview of five innovative projects involving network learning technologies in the United States: (1) the MicroObservatory Internet Telescope is a collection of small, high-quality, and low-maintenance telescopes operated by the Harvard-Smithsonian Center for Astrophysics (Massachusetts), which may be used remotely via the…
ERIC Educational Resources Information Center
Posecznick, Alex
2013-01-01
Selecting, gaining access to and attending college (or university) in the United States involve markers of legitimacy and prestige as understood through symbolic capital. An entire complex of fine differentiations operate to distinguish such capital in both students and the institutions they attend. Drawing on works of Bourdieu, this article…
Positive and Negative Effects of Chicano Militancy on the Education of the Mexican American.
ERIC Educational Resources Information Center
Gonzalez, Nancie L.
Types of organizations (e.g., conservative, militant, those furthering a specific cause, youth organizations, or social club organizations) involved in Chicano movements operating in the 5 southwestern states and other areas with large numbers of Mexican Americans are described in this paper. Such organizations as the League of United Latin…
46 CFR 70.05-3 - Foreign vessels subject to the requirements of this subchapter.
Code of Federal Regulations, 2010 CFR
2010-10-01
... are 100 gross tons or over: (1) Foreign vessels which carry more than 12 passengers from any port in... section, which carry more than 6 passengers from any port in the United States, and which are: (i) Sailing... vessels of novel design or construction, or whose operation involves potential unusual risks shall be...
46 CFR 90.05-1 - Vessels subject to requirements of this subchapter.
Code of Federal Regulations, 2010 CFR
2010-10-01
...(a) and to all such foreign-flag vessels which carry 12 or fewer passengers from any port in the... operation involves potential unusual risks shall be subject to inspection to the extent necessary to safeguard life and property in United States ports, as further provided by § 2.01-13 of subchapter A...
Checking Safety in Technology Education
ERIC Educational Resources Information Center
Gunter, Robert E.
2007-01-01
The Bureau of Labor Statistics (United States Department of Labor, Bureau of Labor Statistics [BLS], n.d.) has shown that workers involved in accidents have little, if any, instruction on the equipment they were using while injured. Keep in mind that instruction on the safe operation of a piece of equipment may take place early in the school year,…
Corporate good citizenship pays off in Central America.
1974-07-22
Fear of expropriation and increasing public scrutiny of the activities of multinational companies are forcing these companies to develop social programs in the countries where they operate. Frequently these programs are viewed as products of colonialism or as veiled attempts to dominate the nationals employed by these companies. The United Brands Company, which is involved in large scale banana production in several Central American countries, has adopted a program which seeks to reduce the paternalism which was associated with the operations of the United Fruit Company, the predecessor of the United Brands Company. A series of new programs emphasizing community self help projects were developed by a company-hired sociologist and initiated 4 years ago. In Panama, the projects were started by holding town meetings in which the citizens decided what projects to pursue. With company help the community has begun to build recreational and educational facilities and are also building new docks. The company is contributing $10 million annually to promote these projects. Other programs involve selling homes to workers for half the cost of constructing these homes and increasing efforts to put host country citizens into management positions. Home ownership is expected to stabilize the work force and increased opportunities for advancement are expected to increase productivity. Future plans include the construction of technical schools which will provide a pool of skilled technicians needed by the banana company.
Overview of Reclamation's geothermal program in Imperial Valley, California
NASA Technical Reports Server (NTRS)
Fulcher, M. K.
1974-01-01
The Bureau of Reclamation is presently involved in a unique Geothermal Resource Development Program in Imperial Valley, California. The main purpose of the investigations is to determine the feasibility of providing a source of fresh water through desalting geothermal fluids stored in the aquifers underlying the valley. Significant progress in this research and development stage to date includes extensive geophysical investigations and the drilling of five geothermal wells on the Mesa anomaly. Four of the wells are for production and monitoring the anomaly, and one will be used for reinjection of waste brines from the desalting units. Two desalting units, a multistage flash unit and a vertical tube evaporator unit, have been erected at the East Mesa test site. The units have been operated on shakedown and continuous runs and have produced substantial quantities of high-quality water.
Application of Six Sigma methodology to a cataract surgery unit.
Taner, Mehmet Tolga
2013-01-01
The article's aim is to focus on the application of Six Sigma to minimise intraoperative and post-operative complications rates in a Turkish public hospital cataract surgery unit. Implementing define-measure-analyse-improve and control (DMAIC) involves process mapping, fishbone diagrams and rigorous data-collection. Failure mode and effect analysis (FMEA), pareto diagrams, control charts and process capability analysis are applied to redress cataract surgery failure root causes. Inefficient skills of assistant surgeons and technicians, low quality of IOLs used, wrong IOL placement, unsystematic sterilisation of surgery rooms and devices, and the unprioritising network system are found to be the critical drivers of intraoperative-operative and post-operative complications. Sigma level was increased from 2.60 to 3.75 subsequent to extensive training of assistant surgeons, ophthalmologists and technicians, better quality IOLs, systematic sterilisation and air-filtering, and the implementation of a more sophisticated network system. This article shows that Six Sigma measurement and process improvement can become the impetus for cataract unit staff to rethink their process and reduce malpractices. Measuring, recording and reporting data regularly helps them to continuously monitor their overall process and deliver safer treatments. This is the first Six Sigma ophthalmology study in Turkey.
NASA Technical Reports Server (NTRS)
Robbins, W. H.; Donoughe, P. L.
1976-01-01
The Communications Technology Satellite (CTS) is a high-power broadcast satellite launched by NASA on January 17, 1976. CTS is the first satellite to operate at a frequency of 12 gigahertz and incorporates technology making possible new satellite telecommunications services. CTS is a cooperative program of the United States and Canada. This paper presents the results of the United States experimental activity to date. Wide segments of the population are involved in the Experiments Program, including the scientific community, other government agencies, industry, and the education and health entities. The experiments are associated with both technological objectives and the demonstration of new community and social services via satellite.
Frac sand in the United States: a geological and industry overview
Benson, Mary Ellen; Wilson, Anna B.; Bleiwas, Donald I.
2015-01-01
More than 40 United States industry operators are involved in the mining, processing, transportation, and distribution of frac sand to a robust market that is fast-growing in the United States and throughout the world. In addition to the abrupt rise in frac sand mining and distribution, a new industry has emerged from the production of alternative proppants, such as coated sand and synthetic beads. Alternative proppants, developed through new technologies, are competing with supplies of natural frac sand. In the long term, the vitality of both industries will be tied to the future of hydraulic fracturing of tight oil and gas reservoirs, which will be driven by the anticipated increases in global energy consumption.
The Automated Aircraft Rework System (AARS): A system integration approach
NASA Technical Reports Server (NTRS)
Benoit, Michael J.
1994-01-01
The Mercer Engineering Research Center (MERC), under contract to the United States Air Force (USAF) since 1989, has been actively involved in providing the Warner Robins Air Logistics Center (WR-ALC) with a robotic workcell designed to perform rework automated defastening and hole location/transfer operations on F-15 wings. This paper describes the activities required to develop and implement this workcell, known as the Automated Aircraft Rework System (AARS). AARS is scheduled to be completely installed and in operation at WR-ALC by September 1994.
Politics of oil: multinational oil corporations and United States foreign policy, 1941-1954
DOE Office of Scientific and Technical Information (OSTI.GOV)
Painter, D.S.
1982-01-01
The energy crises of the 1970s highlighted the importance of foreign oil to United States security and prosperity and focused attention on the relationship between multinational oil corporations and United States foreign policy. Important roots of present problems reach back to the period 1941 to 1954 when United States policymakers became aware that the nation's historic self-sufficiency in oil would soon come to an end. This realization led to plans to assure United States access to foreign oil reserves. During the early years of this period, the oil industry and its allies in congress defeated attempts by the government tomore » play an active role in foreign oil matters. With the government's role limited, the United States fell back to its traditional policy of supporting the foreign operations of United States corporations. Although this policy minimized government intervention in the internal operations of the oil industry, it nevertheless required the government to become actively involved in maintaining the security and stability of the Middle East and in working to contain economic nationalism in Latin America. Moreover, the policy resulted in the government acquiescing in private arrangements by the major companies to control the world oil economy. The most important factor shaping public policy on foreign oil was the overall hegemony of business in American society.« less
Aerospace Meteorology Lessons Learned Relative to Aerospace Vehicle Design and Operations
NASA Technical Reports Server (NTRS)
Vaughan, William W.; Anderson, B. Jeffrey
2004-01-01
Aerospace Meteorology came into being in the 1950s as the development of rockets for military and civilian usage grew in the United States. The term was coined to identify those involved in the development of natural environment models, design/operational requirements, and environment measurement systems to support the needs of aerospace vehicles, both launch vehicles and spacecraft. It encompassed the atmospheric environment of the Earth, including Earth orbit environments. Several groups within the United States were active in this area, including the Department of Defense, National Aeronautics and Space Administration, and a few of the aerospace industry groups. Some aerospace meteorology efforts were similar to those being undertaken relative to aviation interests. As part of the aerospace meteorology activities a number of lessons learned resulted that produced follow on efforts which benefited from these experiences, thus leading to the rather efficient and technologically current descriptions of terrestrial environment design requirements, prelaunch monitoring systems, and forecast capabilities available to support the development and operations of aerospace vehicles.
Riedl, S
2002-02-01
The operating unit is one of the cost-intensive facilities in a surgical clinic with a pacemaking function for most of the internal procedures. The power of performance of the operating unit is based on the co-operation of all disciplines and professions involved. The key to management of the operating unit is not only to co-ordinate the daily procedures, but also to interact with support personnel. To ensure successful OR management, the internal structure of the OR must fit the clinical tasks and the available quantity of personnel in each profession must be co-ordinated. Sufficient utilization of resources and equipment must be guaranteed without cost-intensive over-capacities and patient flow must be orientated to OR capacities. The development of such a business structure requires the management to clearly define the goal, to know the actual on-site data in detail with regard to the idiosyncratic workings of each speciality and to clearly assign the competence of each member of the team working in the OR. Co-ordination of the operating unit is the main task of OR management, which must ensure the following: transparent and co-ordinated schedule management in the various operative specialities, goal-directed changes of the schedule with incorporation of emergencies, as well as effective organization of staff. In order to realize these tasks, it is reasonable to implement interdisciplinary rules of procedures. In addition, the assignment of a neutral decision-making body within the OR and the creation of an information center for all OR personnel. The challenge of OR organization in the future is to implement more effective documentation systems and active controlling within the OR. One can ensure adequate utilization of resources in the OR with prospectively oriented planning. Better transparence of operations in the OR contributes to increased efficiency. Implementation of quality management is the foundation for a successfully operating surgical hospital. Not only the productivity of individual members of the staff, but also the precise documentation of the quality of results will become important parameters in a successful surgical hospital, whose nucleus is the OR.
Quantifying the Impacts of Large Scale Integration of Renewables in Indian Power Sector
NASA Astrophysics Data System (ADS)
Kumar, P.; Mishra, T.; Banerjee, R.
2017-12-01
India's power sector is responsible for nearly 37 percent of India's greenhouse gas emissions. For a fast emerging economy like India whose population and energy consumption are poised to rise rapidly in the coming decades, renewable energy can play a vital role in decarbonizing power sector. In this context, India has targeted 33-35 percent emission intensity reduction (with respect to 2005 levels) along with large scale renewable energy targets (100GW solar, 60GW wind, and 10GW biomass energy by 2022) in INDCs submitted at Paris agreement. But large scale integration of renewable energy is a complex process which faces a number of problems like capital intensiveness, matching intermittent loads with least storage capacity and reliability. In this context, this study attempts to assess the technical feasibility of integrating renewables into Indian electricity mix by 2022 and analyze its implications on power sector operations. This study uses TIMES, a bottom up energy optimization model with unit commitment and dispatch features. We model coal and gas fired units discretely with region-wise representation of wind and solar resources. The dispatch features are used for operational analysis of power plant units under ramp rate and minimum generation constraints. The study analyzes India's electricity sector transition for the year 2022 with three scenarios. The base case scenario (no RE addition) along with INDC scenario (with 100GW solar, 60GW wind, 10GW biomass) and low RE scenario (50GW solar, 30GW wind) have been created to analyze the implications of large scale integration of variable renewable energy. The results provide us insights on trade-offs involved in achieving mitigation targets and investment decisions involved. The study also examines operational reliability and flexibility requirements of the system for integrating renewables.
The Efficiency and the Scalability of an Explicit Operator on an IBM POWER4 System
NASA Technical Reports Server (NTRS)
Frumkin, Michael; Biegel, Bryan A. (Technical Monitor)
2002-01-01
We present an evaluation of the efficiency and the scalability of an explicit CFD operator on an IBM POWER4 system. The POWER4 architecture exhibits a common trend in HPC architectures: boosting CPU processing power by increasing the number of functional units, while hiding the latency of memory access by increasing the depth of the memory hierarchy. The overall machine performance depends on the ability of the caches-buses-fabric-memory to feed the functional units with the data to be processed. In this study we evaluate the efficiency and scalability of one explicit CFD operator on an IBM POWER4. This operator performs computations at the points of a Cartesian grid and involves a few dozen floating point numbers and on the order of 100 floating point operations per grid point. The computations in all grid points are independent. Specifically, we estimate the efficiency of the RHS operator (SP of NPB) on a single processor as the observed/peak performance ratio. Then we estimate the scalability of the operator on a single chip (2 CPUs), a single MCM (8 CPUs), 16 CPUs, and the whole machine (32 CPUs). Then we perform the same measurements for a chache-optimized version of the RHS operator. For our measurements we use the HPM (Hardware Performance Monitor) counters available on the POWER4. These counters allow us to analyze the obtained performance results.
Multinational operations of US for-profit hospital chains: trends and implications.
Berliner, H S; Regan, C
1987-01-01
The expansion of United States for-profit hospital chains into the international arena is a new and important development. Experiences with contract management of middle eastern hospitals in the early 1970s gave the American firms impetus to pursue ownership of health facilities in other parts of the world. US companies now operate over 95 foreign hospitals. The reasons for this involvement include the political receptivity of the government of the host nation; the potential for rapid growth and profits; the lack of indigenous competition; and the ability to occupy a distinct niche within the extant health services organization. The political and ideological implications of the growth of private medicine, particularly in the United Kingdom, in terms of its effects on the National Health Service are discussed. Questions for future research are posed. PMID:3631360
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-05
.... The analyses for LSCS, Unit 2, Cycle 15 have concluded that a two-loop MCPR SL of >= 1.14, based on... safety. The NRC staff has reviewed the licensee's analysis and, based on this review, it appears that the... has provided its analysis of the issue of no significant hazards consideration, which is presented...
Denys Yemshanov; Frank H. Koch; Daniel W. McKenney; Marla C. Downing; Frank Sapio
2009-01-01
Nonindigenous species have caused significant impacts to North American forests despite past and present international phytosanitary efforts. Though broadly acknowledged, the risks of pest invasions are difficult to quantify as they involve interactions between many factors that operate across a range of spatial and temporal scales: the transmission of invading...
ERIC Educational Resources Information Center
Lancioni, Giulio E.; Singh, Nirbhay N.; O'Reilly, Mark F.; Sigafoos, Jeff; Colonna, Fabio; Buonocunto, Francesca; Sacco, Valentina; Megna, Marisa; Oliva, Doretta
2012-01-01
This study assessed microswitch-based technology to enable three post-coma adults, who had emerged from a minimally conscious state but presented motor and communication disabilities, to operate a radio device. The material involved a modified radio device, a microprocessor-based electronic control unit, a personal microswitch, and an amplified…
J. Keith Watson
2005-01-01
To encourage the involvement of southeastern National Park units in bird conservation efforts, the Southeast Region (Florida, Georgia, South Carolina, North Carolina, Tennessee, Alabama, Mississippi, Louisiana, Kentucky, Puerto Rico, and U.S. Virgin Islands) of the National Park Service (NPS) entered into an Interagency Agreement with the US Fish and Wildlife Service....
Experimenting with Solar Energy
ERIC Educational Resources Information Center
Roman, Harry T.
2004-01-01
Over the past 25 years, the author has had the opportunity to study the subject of solar energy and to get involved with the installation, operation, and testing of solar energy systems. His work has taken him all over the United States and put him in contact with solar experts from around the world. He has also had the good fortune of seeing some…
Selecting and Equipping a Home Workshop. Capsules 1-5. Teacher's Guide [and] Student Material.
ERIC Educational Resources Information Center
Sack, Richard
This unit of study provides teaching guidelines and student material intended for use in high school advanced industrial arts programs. The objective is to help students plan and purchase equipment for a home workshop. A necessary prerequisite is a knowledge of the operations and uses of the equipment involved. The material is divided into five…
Review of computational fluid dynamics applications in biotechnology processes.
Sharma, C; Malhotra, D; Rathore, A S
2011-01-01
Computational fluid dynamics (CFD) is well established as a tool of choice for solving problems that involve one or more of the following phenomena: flow of fluids, heat transfer,mass transfer, and chemical reaction. Unit operations that are commonly utilized in biotechnology processes are often complex and as such would greatly benefit from application of CFD. The thirst for deeper process and product understanding that has arisen out of initiatives such as quality by design provides further impetus toward usefulness of CFD for problems that may otherwise require extensive experimentation. Not surprisingly, there has been increasing interest in applying CFD toward a variety of applications in biotechnology processing in the last decade. In this article, we will review applications in the major unit operations involved with processing of biotechnology products. These include fermentation,centrifugation, chromatography, ultrafiltration, microfiltration, and freeze drying. We feel that the future applications of CFD in biotechnology processing will focus on establishing CFD as a tool of choice for providing process understanding that can be then used to guide more efficient and effective experimentation. This article puts special emphasis on the work done in the last 10 years. © 2011 American Institute of Chemical Engineers
Physics and function of operating room suction.
Meagher, A P; Hugh, T B; Li, B; Montano, S R
1991-09-01
A study was done to evaluate the performance of suction apparatus in the operating room. The investigation was prompted by perceived poor suction performance in a suite of new operating rooms built in accordance with Standards Australia (SA) specifications. SA performance tests were conducted on each of four suction outlets in nine operating rooms. All 36 outlets complied with SA standards for flow-rate (minimum 40 L/min) and occluded negative pressure (ONP; minimum -60 kPa). However, 24 collection units failed to comply with standards (ONP) of -40 kPa achieved in less than 4 s when a 4 L disposable suction apparatus was connected (mean time to ONP: 6.1 s, 95% confidence interval: 4.9, 7.3). When smaller capacity suction jars were substituted, more units met SA standards. The standards therefore need revision to include specification of the capacity of the collecting apparatus. Other factors that were found to degrade suction performance significantly were air leakage and defective shut-off valves. The physical principles involved in operating room suction are described. Surgeons and anaesthetists should understand these principles, and it is recommended that a simple pre-operative check of the suction apparatus should be carried out, as follows: (1) Turn the wall control knob fully on, and disconnect the suction apparatus. The gauge should register zero. (2) Connect the suction jars. If the indicated gauge pressure is in excess of -15 kPa, investigate the equipment for excessive resistance, particularly in the shut-off valve, which should be replaced with a new unit if necessary.(ABSTRACT TRUNCATED AT 250 WORDS)
Sensor-Based Optimized Control of the Full Load Instability in Large Hydraulic Turbines
Presas, Alexandre; Valero, Carme; Egusquiza, Eduard
2018-01-01
Hydropower plants are of paramount importance for the integration of intermittent renewable energy sources in the power grid. In order to match the energy generated and consumed, Large hydraulic turbines have to work under off-design conditions, which may lead to dangerous unstable operating points involving the hydraulic, mechanical and electrical system. Under these conditions, the stability of the grid and the safety of the power plant itself can be compromised. For many Francis Turbines one of these critical points, that usually limits the maximum output power, is the full load instability. Therefore, these machines usually work far away from this unstable point, reducing the effective operating range of the unit. In order to extend the operating range of the machine, working closer to this point with a reasonable safety margin, it is of paramount importance to monitor and to control relevant parameters of the unit, which have to be obtained with an accurate sensor acquisition strategy. Within the framework of a large EU project, field tests in a large Francis Turbine located in Canada (rated power of 444 MW) have been performed. Many different sensors were used to monitor several working parameters of the unit for all its operating range. Particularly for these tests, more than 80 signals, including ten type of different sensors and several operating signals that define the operating point of the unit, were simultaneously acquired. The present study, focuses on the optimization of the acquisition strategy, which includes type, number, location, acquisition frequency of the sensors and corresponding signal analysis to detect the full load instability and to prevent the unit from reaching this point. A systematic approach to determine this strategy has been followed. It has been found that some indicators obtained with different types of sensors are linearly correlated with the oscillating power. The optimized strategy has been determined based on the correlation characteristics (linearity, sensitivity and reactivity), the simplicity of the installation and the acquisition frequency necessary. Finally, an economic and easy implementable protection system based on the resulting optimized acquisition strategy is proposed. This system, which can be used in a generic Francis turbine with a similar full load instability, permits one to extend the operating range of the unit by working close to the instability with a reasonable safety margin. PMID:29601512
Sensor-Based Optimized Control of the Full Load Instability in Large Hydraulic Turbines.
Presas, Alexandre; Valentin, David; Egusquiza, Mònica; Valero, Carme; Egusquiza, Eduard
2018-03-30
Hydropower plants are of paramount importance for the integration of intermittent renewable energy sources in the power grid. In order to match the energy generated and consumed, Large hydraulic turbines have to work under off-design conditions, which may lead to dangerous unstable operating points involving the hydraulic, mechanical and electrical system. Under these conditions, the stability of the grid and the safety of the power plant itself can be compromised. For many Francis Turbines one of these critical points, that usually limits the maximum output power, is the full load instability. Therefore, these machines usually work far away from this unstable point, reducing the effective operating range of the unit. In order to extend the operating range of the machine, working closer to this point with a reasonable safety margin, it is of paramount importance to monitor and to control relevant parameters of the unit, which have to be obtained with an accurate sensor acquisition strategy. Within the framework of a large EU project, field tests in a large Francis Turbine located in Canada (rated power of 444 MW) have been performed. Many different sensors were used to monitor several working parameters of the unit for all its operating range. Particularly for these tests, more than 80 signals, including ten type of different sensors and several operating signals that define the operating point of the unit, were simultaneously acquired. The present study, focuses on the optimization of the acquisition strategy, which includes type, number, location, acquisition frequency of the sensors and corresponding signal analysis to detect the full load instability and to prevent the unit from reaching this point. A systematic approach to determine this strategy has been followed. It has been found that some indicators obtained with different types of sensors are linearly correlated with the oscillating power. The optimized strategy has been determined based on the correlation characteristics (linearity, sensitivity and reactivity), the simplicity of the installation and the acquisition frequency necessary. Finally, an economic and easy implementable protection system based on the resulting optimized acquisition strategy is proposed. This system, which can be used in a generic Francis turbine with a similar full load instability, permits one to extend the operating range of the unit by working close to the instability with a reasonable safety margin.
NASA Technical Reports Server (NTRS)
Flanigan, Lee A.; Tamir, David; Weeks, Jack L.; Mcclure, Sidney R.; Kimbrough, Andrew G.
1994-01-01
This paper wrestles with the on-orbit operational challenges introduced by the proposed Space Construction, Repair, and Maintenance (SCRAM) tool kit for Extra-Vehicular Activity (EVA). SCRAM undertakes a new challenging series of on-orbit tasks in support of the near-term Hubble Space Telescope, Extended Duration Orbiter, Long Duration Orbiter, Space Station Freedom, other orbital platforms, and even the future manned Lunar/Mars missions. These new EVA tasks involve welding, brazing, cutting, coating, heat-treating, and cleaning operations. Anticipated near-term EVA-SCRAM applications include construction of fluid lines and structural members, repair of punctures by orbital debris, refurbishment of surfaces eroded by atomic oxygen, and cleaning of optical, solar panel, and high emissivity radiator surfaces which have been degraded by contaminants. Future EVA-SCRAM applications are also examined, involving mass production tasks automated with robotics and artificial intelligence, for construction of large truss, aerobrake, and reactor shadow shield structures. Realistically achieving EVA-SCRAM is examined by addressing manual, teleoperated, semi-automated, and fully-automated operation modes. The operational challenges posed by EVA-SCRAM tasks are reviewed with respect to capabilities of existing and upcoming EVA systems, such as the Extravehicular Mobility Unit, the Shuttle Remote Manipulating System, the Dexterous End Effector, and the Servicing Aid Tool.
[Endoscopic follow-up of translaryngeal Fantoni tracheostomy].
Succo, G; Crosetti, E; Mattalia, P; Voltolina, M; Bramardi, F; Di Lisi, D; Riva, F; Sartoris, A
2002-08-01
Dilatational tracheotomy techniques are widely used in the long-term management of the respiratory tract in patients in intensive care units (ICU). The translaryngeal tracheotomy technique (TLT) was first described by Fantoni in 1993 and rapidly asserted itself, especially in Europe. This technique basically differs from the other percutaneous techniques in that it involves a progressive, retrograde, dilatation of the trachea in a single session conducted from inside the trachea, working outward, simultaneously exerting a counter-pressure on the pre-tracheal soft tissues with the fingers. The present study involves an endoscopy follow-up of 130 patients who had undergone TLT at the Intensive Care Unit of our Hospital between November 2000 and May 2001. The pre-operative oro-tracheal intubation time varied from 1 to 42 days. All patients filled out a brief questionnaire containing validated questions on their general health and quality of life with particular attention focused on respiratory conditions. Then, after receiving informed consent, the patients underwent laryngo-tracheoscopy with local anesthetic using a flexible tracheobronchoscope. All tests were recorded and viewed later by two operators in order to identify and divide the patients according to the level of execution of the tracheotomy and the presence of sequelae. The results obtained have shown that, like other percutaneous tracheotomy techniques, TLT provides some benefits including the fact that procedure can be performed at the bedside in a short time, with few post-operative complications, simpler nursing and fewer sequelae in time. Analysis of data concerning time of tracheostomy execution, tracheal level of stomia and nursing times has revealed three factors that determine severe sequelae: delay in tracheostomy execution, high level of execution with cricoid involvement and onset of problems during first tracheal cannula change.
NASA Technical Reports Server (NTRS)
Berk, A.; Temkin, A.
1985-01-01
A sum rule is derived for the auxiliary eigenvalues of an equation whose eigenspectrum pertains to projection operators which describe electron scattering from multielectron atoms and ions. The sum rule's right-hand side depends on an integral involving the target system eigenfunctions. The sum rule is checked for several approximations of the two-electron target. It is shown that target functions which have a unit eigenvalue in their auxiliary eigenspectrum do not give rise to well-defined projection operators except through a limiting process. For Hylleraas target approximations, the auxiliary equations are shown to contain an infinite spectrum. However, using a Rayleigh-Ritz variational principle, it is shown that a comparatively simple aproximation can exhaust the sum rule to better than five significant figures. The auxiliary Hylleraas equation is greatly simplified by conversion to a square root equation containing the same eigenfunction spectrum and from which the required eigenvalues are trivially recovered by squaring.
Digital processing of array seismic recordings
Ryall, Alan; Birtill, John
1962-01-01
This technical letter contains a brief review of the operations which are involved in digital processing of array seismic recordings by the methods of velocity filtering, summation, cross-multiplication and integration, and by combinations of these operations (the "UK Method" and multiple correlation). Examples are presented of analyses by the several techniques on array recordings which were obtained by the U.S. Geological Survey during chemical and nuclear explosions in the western United States. Seismograms are synthesized using actual noise and Pn-signal recordings, such that the signal-to-noise ratio, onset time and velocity of the signal are predetermined for the synthetic record. These records are then analyzed by summation, cross-multiplication, multiple correlation and the UK technique, and the results are compared. For all of the examples presented, analysis by the non-linear techniques of multiple correlation and cross-multiplication of the traces on an array recording are preferred to analyses by the linear operations involved in summation and the UK Method.
Improving the pathologic evaluation of lung cancer resection specimens.
Osarogiagbon, Raymond U; Hilsenbeck, Holly L; Sales, Elizabeth W; Berry, Allen; Jarrett, Robert W; Giampapa, Christopher S; Finch-Cruz, Clara N; Spencer, David
2015-08-01
Accurate post-operative prognostication and management heavily depend on pathologic nodal stage. Patients with nodal metastasis benefit from post-operative adjuvant chemotherapy, those with mediastinal nodal involvement may also benefit from adjuvant radiation therapy. However, the quality of pathologic nodal staging varies significantly, with major survival implications in large populations of patients. We describe the quality gap in pathologic nodal staging, and provide evidence of its potential reversibility by targeted corrective interventions. One intervention, designed to improve the surgical lymphadenectomy, specimen labeling, and secure transfer between the operating theatre and the pathology laboratory, involves use of pre-labeled specimen collection kits. Another intervention involves application of an improved method of gross dissection of lung resection specimens, to reduce the inadvertent loss of intrapulmonary lymph nodes to histologic examination for metastasis. These corrective interventions are the subject of a regional dissemination and implementation project in diverse healthcare systems in a tri-state region of the United States with some of the highest lung cancer incidence and mortality rates. We discuss the potential of these interventions to significantly improve the accuracy of pathologic nodal staging, risk stratification, and the quality of specimens available for development of stage-independent prognostic markers in lung cancer.
Looby, Mairead; Ibarra, Neysi; Pierce, James J; Buckley, Kevin; O'Donovan, Eimear; Heenan, Mary; Moran, Enda; Farid, Suzanne S; Baganz, Frank
2011-01-01
This study describes the application of quality by design (QbD) principles to the development and implementation of a major manufacturing process improvement for a commercially distributed therapeutic protein produced in Chinese hamster ovary cell culture. The intent of this article is to focus on QbD concepts, and provide guidance and understanding on how the various components combine together to deliver a robust process in keeping with the principles of QbD. A fed-batch production culture and a virus inactivation step are described as representative examples of upstream and downstream unit operations that were characterized. A systematic approach incorporating QbD principles was applied to both unit operations, involving risk assessment of potential process failure points, small-scale model qualification, design and execution of experiments, definition of operating parameter ranges and process validation acceptance criteria followed by manufacturing-scale implementation and process validation. Statistical experimental designs were applied to the execution of process characterization studies evaluating the impact of operating parameters on product quality attributes and process performance parameters. Data from process characterization experiments were used to define the proven acceptable range and classification of operating parameters for each unit operation. Analysis of variance and Monte Carlo simulation methods were used to assess the appropriateness of process design spaces. Successful implementation and validation of the process in the manufacturing facility and the subsequent manufacture of hundreds of batches of this therapeutic protein verifies the approaches taken as a suitable model for the development, scale-up and operation of any biopharmaceutical manufacturing process. Copyright © 2011 American Institute of Chemical Engineers (AIChE).
Oak Ridge Reservation annual site environmental report for 1997: Color your tomorrow
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hamilton, L.V.
1998-10-01
The U.S. Department of Energy currently oversees activities on the Oak Ridge Reservation (ORR), a government-owned, contractor-operated facility. The reservation contains three major operating sites: the Oak Ridge Y-12 Plant, Oak Ridge National Laboratory, and East Tennessee Technology Park (formerly the K-25 Site). The ORR was established in the early 1940s as part of the Manhattan Project, a secret undertaking that produced the materials for the first atomic bombs. The reservation's role has evolved over the years, and it continues to adapt to meet the changing defense, energy, and research needs of the United States. Both the work carried outmore » for the war effort and subsequent research, development, and production activities have involved (and continue to involve) radiological and hazardous materials.« less
Accelerated recovery after cardiac operations.
Kaplan, Mehmet; Kut, Mustafa Sinan; Yurtseven, Nurgul; Cimen, Serdar; Demirtas, Mahmut Murat
2002-01-01
The accelerated-recovery approach, involving early extubation, early mobility, decreased duration of intensive care unit stay, and decreased duration of hospitalization has recently become a controversial issue in cardiac surgery. We investigated timing of extubation, length of intensive care unit stay, and duration of hospitalization in 225 consecutive cardiac surgery patients. Of the 225 patients, 139 were male and 86 were female; average age was 49.73 +/- 16.95 years. Coronary artery bypass grafting was performed in 127 patients; 65 patients underwent aortic and/or mitral or pulmonary valvular operations; 5 patients underwent valvular plus coronary artery operations; and in 28 patients surgical interventions for congenital anomalies were carried out. The accelerated-recovery approach could be applied in 169 of the 225 cases (75.11%). Accelerated-recovery patients were extubated after an average of 3.97 +/- 1.59 hours, and the average duration of stay in the intensive care unit was 20.93 +/- 2.44 hours for these patients. Patients were discharged if they met all of the following criteria: hemodynamic stability, cooperativeness, ability to initiate walking exercises within wards, lack of pathology in laboratory investigations, and psychological readiness for discharge. Mean duration of hospitalization for accelerated-recovery patients was 4.24 +/- 0.75 days. Two patients (1.18%) who were extubated within the first 6 hours required reintubation. Four patients (2.36%) who were sent to the wards returned to intensive care unit due to various reasons and 6 (3.55%) of the discharged patients were rehospitalized. Approaches for decreasing duration of intubation, intensive care unit stay and hospitalization may be applied in elective and uncomplicated cardiac surgical interventions with short duration of aortic cross-clamping and cardiopulmonary bypass, without risking patients. Frequencies of reintubation, return to intensive care unit, and rehospitalization are quite low with this approach.
Financing Strategies For A Nuclear Fuel Cycle Facility
DOE Office of Scientific and Technical Information (OSTI.GOV)
David Shropshire; Sharon Chandler
2006-07-01
To help meet the nation’s energy needs, recycling of partially used nuclear fuel is required to close the nuclear fuel cycle, but implementing this step will require considerable investment. This report evaluates financing scenarios for integrating recycling facilities into the nuclear fuel cycle. A range of options from fully government owned to fully private owned were evaluated using DPL (Decision Programming Language 6.0), which can systematically optimize outcomes based on user-defined criteria (e.g., lowest lifecycle cost, lowest unit cost). This evaluation concludes that the lowest unit costs and lifetime costs are found for a fully government-owned financing strategy, due tomore » government forgiveness of debt as sunk costs. However, this does not mean that the facilities should necessarily be constructed and operated by the government. The costs for hybrid combinations of public and private (commercial) financed options can compete under some circumstances with the costs of the government option. This analysis shows that commercial operations have potential to be economical, but there is presently no incentive for private industry involvement. The Nuclear Waste Policy Act (NWPA) currently establishes government ownership of partially used commercial nuclear fuel. In addition, the recently announced Global Nuclear Energy Partnership (GNEP) suggests fuels from several countries will be recycled in the United States as part of an international governmental agreement; this also assumes government ownership. Overwhelmingly, uncertainty in annual facility capacity led to the greatest variations in unit costs necessary for recovery of operating and capital expenditures; the ability to determine annual capacity will be a driving factor in setting unit costs. For private ventures, the costs of capital, especially equity interest rates, dominate the balance sheet; and the annual operating costs, forgiveness of debt, and overnight costs dominate the costs computed for the government case. The uncertainty in operations, leading to lower than optimal processing rates (or annual plant throughput), is the most detrimental issue to achieving low unit costs. Conversely, lowering debt interest rates and the required return on investments can reduce costs for private industry.« less
Quantum Computation Using Optically Coupled Quantum Dot Arrays
NASA Technical Reports Server (NTRS)
Pradhan, Prabhakar; Anantram, M. P.; Wang, K. L.; Roychowhury, V. P.; Saini, Subhash (Technical Monitor)
1998-01-01
A solid state model for quantum computation has potential advantages in terms of the ease of fabrication, characterization, and integration. The fundamental requirements for a quantum computer involve the realization of basic processing units (qubits), and a scheme for controlled switching and coupling among the qubits, which enables one to perform controlled operations on qubits. We propose a model for quantum computation based on optically coupled quantum dot arrays, which is computationally similar to the atomic model proposed by Cirac and Zoller. In this model, individual qubits are comprised of two coupled quantum dots, and an array of these basic units is placed in an optical cavity. Switching among the states of the individual units is done by controlled laser pulses via near field interaction using the NSOM technology. Controlled rotations involving two or more qubits are performed via common cavity mode photon. We have calculated critical times, including the spontaneous emission and switching times, and show that they are comparable to the best times projected for other proposed models of quantum computation. We have also shown the feasibility of accessing individual quantum dots using the NSOM technology by calculating the photon density at the tip, and estimating the power necessary to perform the basic controlled operations. We are currently in the process of estimating the decoherence times for this system; however, we have formulated initial arguments which seem to indicate that the decoherence times will be comparable, if not longer, than many other proposed models.
NASA Technical Reports Server (NTRS)
1986-01-01
American Water Corporation manufactures water filtration products which incorporate technology originally developed for manned space operations. The formula involves granular activated charcoal and other ingredients, and removes substances by catalytic reactions, mechanical filtration, and absorption. Details are proprietary. A NASA literature search contributed to development of the compound. The technology is being extended to a deodorizing compound called Biofresh which traps gas and moisture inside the unit. Further applications are anticipated.
Operating Room Telephone Microbial Flora
2005-06-02
infections per year in the United States (1). Nosocomial infections contribute to prolonged antimicrobial treatments, length-of-stays, and even death. The...surgical site infections ? An inanimate surface that is implicated in a nosocomial infection is termed as a fomite. Are telephones in the OR fomites? Given...the potential impact of nosocomial infections in the perioperative setting, research is needed to describe if the bacteria most frequently involved in
Annual Research Progress Report (U.S. Army Institute of Dental Research, Washington, DC)
1978-10-01
postoperative edema, minimal postoperative scarring, sterilization of infected wounds, minimal pain and a sharply demarcated operative field. This...evaluate pain killing medicaments used in military dental practice. The hazards involved in the use of various drugs will be studied and...Surgical treatment of orofacial wounds frequently requires use of high-speed equipment and ultrasonic sealers. Water from dental units has been
[The gestalt problem in neurobiology].
Sokolov, E N
1996-01-01
The paper concerns the concept of gestalt in the framework of neuronal mechanisms. Two hypotheses are discussed: 1) hierarchy of neurons (gnostic units), 2) synchronization of neurons. It is concluded that gestalt is based on hierarchical vectorial organization of neurons. The high frequency oscillations in gamma range (40-200 Hz) are of intrinsic origin. They are operating as amplifiers of synaptic inputs of neurons involved in gestalt representation.
Recycling agroindustrial waste by lactic fermentations: coffee pulp silage
DOE Office of Scientific and Technical Information (OSTI.GOV)
Carrizales, V.; Ferrer, J.
1985-04-03
This UNIDO publication on lactic acid fermentation of coffee pulp for feed production covers (1) a process which can be adapted to existing coffee processing plants for drying the product once harvesting time has finished (2) unit operations involved: pressing (optional), silaging, liming and drying (3) experiments, results and discussion, bibliography, process statistics, and diagrams. Additional references: storage, biotechnology, lime, agricultural wastes, recycling, waste utilization.
Beaches of the Future: Analyzing Territorial Disputes in South America
2016-09-01
Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork...in the Twentieth Century (Cambridge: Cambridge University Press, 2002), 16. 28 Ibid. 11 realist approach that finds leaders concurrently managing ...United Kingdom107 Alternatively, these arbitration treaties managed to cool tensions between the Argentina and Chile, two stockpiling players involved
NASA Technical Reports Server (NTRS)
Knox, James C.; Miller, Lee; Campbell, Melissa; Mulloth, Lila; Varghese, Mini
2006-01-01
Accumulation and subsequent compression of carbon dioxide that is removed from the space cabin are two important processes involved in a closed-loop air revitalization scheme of the International Space Station (ISS). The 4-Bed Molecular Sieve (4BMS) of ISS currently operates in an open loop mode without a compressor. The Sabatier Engineering Development Unit (EDU) processes waste CO2 to provide water to the crew. This paper reports the integrated 4BMS, air-cooled Temperature Swing Adsorption Compressor (TSAC), and Sabatier EDU testing. The TSAC prototype was developed at NASA Ames Research Center (ARC). The 4BMS was modified to a functionally flight-like condition at NASA Marshall Space Flight Center (MSFC). Testing was conducted at MSFC. The paper provides details of the TSAC operation at various CO2 loadings and corresponding performance of the 4BMS and Sabatier.
Solar thermochemical processing system and method
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wegeng, Robert S.; Humble, Paul H.; Krishnan, Shankar
A solar thermochemical processing system is disclosed. The system includes a first unit operation for receiving concentrated solar energy. Heat from the solar energy is used to drive the first unit operation. The first unit operation also receives a first set of reactants and produces a first set of products. A second unit operation receives the first set of products from the first unit operation and produces a second set of products. A third unit operation receives heat from the second unit operation to produce a portion of the first set of reactants.
NASA Technical Reports Server (NTRS)
Tomsik, Thomas M.; Meyer, Michael L.
2010-01-01
This paper describes in-detail a test program that was initiated at the Glenn Research Center (GRC) involving the cryogenic densification of liquid oxygen (LO2). A large scale LO2 propellant densification system rated for 200 gpm and sized for the X-33 LO2 propellant tank, was designed, fabricated and tested at the GRC. Multiple objectives of the test program included validation of LO2 production unit hardware and characterization of densifier performance at design and transient conditions. First, performance data is presented for an initial series of LO2 densifier screening and check-out tests using densified liquid nitrogen. The second series of tests show performance data collected during LO2 densifier test operations with liquid oxygen as the densified product fluid. An overview of LO2 X-33 tanking operations and load tests with the 20,000 gallon Structural Test Article (STA) are described. Tank loading testing and the thermal stratification that occurs inside of a flight-weight launch vehicle propellant tank were investigated. These operations involved a closed-loop recirculation process of LO2 flow through the densifier and then back into the STA. Finally, in excess of 200,000 gallons of densified LO2 at 120 oR was produced with the propellant densification unit during the demonstration program, an achievement that s never been done before in the realm of large-scale cryogenic tests.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Graham, Richard L; Poole, Stephen W; Shamis, Pavel
2010-01-01
This paper introduces the newly developed Infini-Band (IB) Management Queue capability, used by the Host Channel Adapter (HCA) to manage network task data flow dependancies, and progress the communications associated with such flows. These tasks include sends, receives, and the newly supported wait task, and are scheduled by the HCA based on a data dependency description provided by the user. This functionality is supported by the ConnectX-2 HCA, and provides the means for delegating collective communication management and progress to the HCA, also known as collective communication offload. This provides a means for overlapping collective communications managed by the HCAmore » and computation on the Central Processing Unit (CPU), thus making it possible to reduce the impact of system noise on parallel applications using collective operations. This paper further describes how this new capability can be used to implement scalable Message Passing Interface (MPI) collective operations, describing the high level details of how this new capability is used to implement the MPI Barrier collective operation, focusing on the latency sensitive performance aspects of this new capability. This paper concludes with small scale benchmark experiments comparing implementations of the barrier collective operation, using the new network offload capabilities, with established point-to-point based implementations of these same algorithms, which manage the data flow using the central processing unit. These early results demonstrate the promise this new capability provides to improve the scalability of high performance applications using collective communications. The latency of the HCA based implementation of the barrier is similar to that of the best performing point-to-point based implementation managed by the central processing unit, starting to outperform these as the number of processes involved in the collective operation increases.« less
Cycling operation of fossil plants
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bhatnagar, U.S.; Weiss, M.D.; White, W.H.
1991-05-01
This report presents a methodology for examining the economic feasibility of converting fossil power plants from baseload to cycling service. It employs this approach to examine a proposed change of Pepco's Potomac River units 3, 4, and 5 from baseload operation of two-shift cycling. The project team first reviewed all components and listed potential cycling effects involved in the conversion of Potomac River units 3, 4, and 5. They developed general cycling plant screening criteria including the number of hot, warm, or cold restart per year and desired load ramp rates. In addition, they evaluated specific limitations on the boiler,more » turbine, and the balance of plant. They estimated the remaining life of the facility through component evaluation and boiler testing and also identified and prioritized potential component deficiencies by their impact on key operational factors: safety, heat rate, turn down, startup/shutdown time, and plant availability. They developed solutions to these problems; and, since many solutions mitigate more than one problem, they combined and reprioritized these synergistic solutions. Economic assessments were performed on all solutions. 13 figs., 20 tabs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bloom, R.R.
1996-04-01
The objective of this report is to demonstrate that a thorough assessment of the risks associated with the operation of the Rust Geotech patented VAC*TRAX mobile treatment unit (MTU) has been performed and documented. The MTU was developed to treat mixed wastes at the US Department of Energy (DOE) Albuquerque Operations Office sites. The MTU uses an indirectly heated, batch vacuum dryer to thermally desorb organic compounds from mixed wastes. This process hazards analysis evaluated 102 potential hazards. The three significant hazards identified involved the inclusion of oxygen in a process that also included an ignition source and fuel. Changesmore » to the design of the MTU were made concurrent with the hazard identification and analysis; all hazards with initial risk rankings of 1 or 2 were reduced to acceptable risk rankings of 3 or 4. The overall risk to any population group from operation of the MTU was determined to be very low; the MTU is classified as a Radiological Facility with low hazards.« less
Impact of Site Elevation on Mg Smelter Design
NASA Astrophysics Data System (ADS)
Baker, Phillip W.
Site elevation has many surprising and significant impacts on the engineering design of metallurgical plant of all types. Electrolytic magnesium smelters maybe built at high elevation for a variety of reasons including availability of raw material, energy or electric power. Because of the unit processes they typically involve, Mg smelters can be extensively impacted by site elevation. In this paper, generic examples of the design changes required to adapt a smelter originally designed for sea level to operate at 2700 m are presented. While the examples are drawn from a magnesium plant design case, these changes are generically applicable to all industrial plants utilizing similar unit processes irrespective of product.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Horowitz, Kelsey A; Ding, Fei; Mather, Barry A
The increasing deployment of distributed photovoltaic systems (DPV) can impact operations at the distribution level and the transmission level of the electric grid. It is important to develop and implement forward-looking approaches for calculating distribution upgrade costs that can be used to inform system planning, market and tariff design, cost allocation, and other policymaking as penetration levels of DPV increase. Using a bottom-up approach that involves iterative hosting capacity analysis, this report calculates distribution upgrade costs as a function of DPV penetration on three real feeders - two in California and one in the Northeastern United States.
Preliminary development of digital signal processing in microwave radiometers
NASA Technical Reports Server (NTRS)
Stanley, W. D.
1980-01-01
Topics covered involve a number of closely related tasks including: the development of several control loop and dynamic noise model computer programs for simulating microwave radiometer measurements; computer modeling of an existing stepped frequency radiometer in an effort to determine its optimum operational characteristics; investigation of the classical second order analog control loop to determine its ability to reduce the estimation error in a microwave radiometer; investigation of several digital signal processing unit designs; initiation of efforts to develop required hardware and software for implementation of the digital signal processing unit; and investigation of the general characteristics and peculiarities of digital processing noiselike microwave radiometer signals.
Very Large Scale Integrated Circuits for Military Systems.
1981-01-01
ABBREVIATIONS A/D Analog-to-digital C AGC Automatic Gain Control A A/J Anti-jam ASP Advanced Signal Processor AU Arithmetic Units C.AD Computer-Aided...ESM) equipments (Ref. 23); in lieu of an adequate automatic proces- sing capability, the function is now performed manually (Ref. 24), which involves...a human operator, displays, etc., and a sacrifice in performance (acquisition speed, saturation signal density). Various automatic processing
ERIC Educational Resources Information Center
Congress of the U.S., Washington, DC. Senate Committee on International Relations.
The purpose of the five-day hearings was to provide a forum for examination by members of the House Committee on International Relations of public and private involvement in international education programs in the United States. The proceedings contain testimony and prepared statements by educators, foundation officials, federal government agency…
Analyzing Vehicle Operator Deviations
2008-07-01
Organization Report No. Scarborough A, Bailey L, Pounds J 9. Performing Organization Name and Address 10. Work Unit No. ( TRAIS ) FAA Civil...Investigation Reporting Form Instructions Use the accompanying flow charts (D4-D14) and Data Reporting Form (D15-D18) to document the results of the...happened, use the Entry Level Flow Chart (D3) to identify the relevant mental processes that were involved in the VOD. For each mental process identified
Complexity Leadership Theory: A United States Marine Corps Historical Overlay
2017-05-25
methodology is comparative, introducing Dr. Mary Uhl- Bien’s complexity leadership model as the lens to evaluate two historical case studies involving...transformed the Marine Corps, but changed broader warfare. In each case , the US military relied on the innovation for the operating environment that...immediately followed. The case studies indicate a legacy of Marine Corps’ senior leadership fostering a culture with the capacity to circumvent
2016-05-01
Certification Program ETH Ethene GC Gas Chromatography GC-IRMS Gas Chromatography Isotope Ratio Mass Spectroscopy H Hydrogen IRMS Isotope...tool for attenuation of chlorinated solvents. The Demonstration Site was Operable Unit 10 at Hill AFB, Utah , a site where groundwater is impacted...techniques. The method involves extraction of the target compounds from environmental sample matrix, followed by separation of the compounds using gas
Ensuring Operational Access: Leveraging Engineering Contractors in the Pacific
2015-05-21
could leverage manpower already in theater and did not compete for limited military lift to deploy into theater.48 The second circumstance involved...Report highlighted that expeditionary contractors filled critical manpower gaps when political decisions limited the amount of military forces in a...direct the US Navy to redeploy fleet units to the Atlantic. This produced a shipping shortage in the Pacific and slowed work between May and August
Organizational and Teamwork Factors of Tele-Intensive Care Units.
Wilkes, Michael S; Marcin, James P; Ritter, Lois A; Pruitt, Sherilyn
2016-09-01
Use of tele-intensive care involves organizational and teamwork factors across geographic locations. This situation adds to the complexity of collaboration in providing quality patient-centered care. To evaluate cross-agency teamwork of health care professionals caring for patients in tele-intensive care units in rural and urban regions. A national qualitative study was conducted in 3 US geographic regions with tele-intensive care programs. Discussions and interviews were held with key participants during site visits at 3 hub sites (specialist services location) and 8 rural spoke sites (patient location). The effects of communication and culture between the hub team and the spoke team on use of the services and effectiveness of care were evaluated. A total of 34 participants were interviewed. Specific organizational and teamwork factors significantly affect the functionality of a tele-intensive care unit. Key operational and cultural barriers that limit the benefits of the units include unrealistic expectations about operational capabilities, lack of trust, poorly defined leadership, and a lack of communication policies. Potential solutions include education on spoke facility resources, clearly defined expectations and role reversal education, team-building activities, and feedback mechanisms to share concerns, successes, and suggestions. Proper administration and attention to important cultural and teamwork factors are essential to making tele-intensive care units effective, practical, and sustainable. ©2016 American Association of Critical-Care Nurses.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-18
... New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites AGENCY: Nuclear Regulatory... construct and operate new nuclear power plants (NPPs) on multi-unit sites to provide an evaluation of the... License) of New Nuclear Power Plants on Operating Units at Multi-Unit Sites (Package). ML112630039 Federal...
Drobniewski, F. A.; Gibson, A.; Ruddy, M.; Yates, M. D.
2003-01-01
The aim of this study was to develop a national model and analyze the value of a molecular epidemiological Mycobacterium tuberculosis DNA fingerprint-outbreak database. Incidents were investigated by the United Kingdom PHLS Mycobacterium Reference Unit (MRU) from June 1997 to December 2001, inclusive. A total of 124 incidents involving 972 tuberculosis cases, including 520 patient cultures from referred incidents and 452 patient cultures related to two population studies, were examined by using restriction fragment length polymorphism IS6110 fingerprinting and rapid epidemiological typing. Investigations were divided into the following three categories, reflecting different operational strategies: retrospective passive analysis, retrospective active analysis, and retrospective prospective analysis. The majority of incidents were in the retrospective passive analysis category, i.e., the individual submitting isolates has a suspicion they may be linked. Outbreaks were examined in schools, hospitals, farms, prisons, and public houses, and laboratory cross-contamination events and unusual clinical presentations were investigated. Retrospective active analysis involved a major outbreak centered on a high school. Contact tracing of a teenager with smear-positive pulmonary tuberculosis matched 14 individuals, including members of his class, and another 60 cases were identified in schools clinically and radiologically and by skin testing. Retrospective prospective analysis involved an outbreak of 94 isoniazid-resistant tuberculosis cases in London, United Kingdom, that began after cases were identified at one hospital in January 2000. Contact tracing and comparison with MRU databases indicated that the earliest matched case had occurred in 1995. Subsequently, the MRU changed to an active prospective analysis targeting linked isoniazid-monoresistant isolates for follow up. The patients were multiethnic, born mainly in the United Kingdom, and included professionals, individuals from the music industry, intravenous drug abusers, and prisoners. PMID:12734218
Drobniewski, F A; Gibson, A; Ruddy, M; Yates, M D
2003-05-01
The aim of this study was to develop a national model and analyze the value of a molecular epidemiological Mycobacterium tuberculosis DNA fingerprint-outbreak database. Incidents were investigated by the United Kingdom PHLS Mycobacterium Reference Unit (MRU) from June 1997 to December 2001, inclusive. A total of 124 incidents involving 972 tuberculosis cases, including 520 patient cultures from referred incidents and 452 patient cultures related to two population studies, were examined by using restriction fragment length polymorphism IS6110 fingerprinting and rapid epidemiological typing. Investigations were divided into the following three categories, reflecting different operational strategies: retrospective passive analysis, retrospective active analysis, and retrospective prospective analysis. The majority of incidents were in the retrospective passive analysis category, i.e., the individual submitting isolates has a suspicion they may be linked. Outbreaks were examined in schools, hospitals, farms, prisons, and public houses, and laboratory cross-contamination events and unusual clinical presentations were investigated. Retrospective active analysis involved a major outbreak centered on a high school. Contact tracing of a teenager with smear-positive pulmonary tuberculosis matched 14 individuals, including members of his class, and another 60 cases were identified in schools clinically and radiologically and by skin testing. Retrospective prospective analysis involved an outbreak of 94 isoniazid-resistant tuberculosis cases in London, United Kingdom, that began after cases were identified at one hospital in January 2000. Contact tracing and comparison with MRU databases indicated that the earliest matched case had occurred in 1995. Subsequently, the MRU changed to an active prospective analysis targeting linked isoniazid-monoresistant isolates for follow up. The patients were multiethnic, born mainly in the United Kingdom, and included professionals, individuals from the music industry, intravenous drug abusers, and prisoners.
The Role of Government in Physician Reimbursement.
Woerheide, James; Lake, Tim; Rich, Eugene C
2016-01-01
Governments around the world exert a substantial degree of influence over physician reimbursement, but the structure and level of that influence varies greatly. This article defines and analyzes the role of government in physician reimbursement both internationally and in the United States. We create a typology for government involvement in physician reimbursement that divides intervention into either direct control or indirect control. Within those broad categories, we describe more specific forms of involvement including rate setting, operating as a public payer, employing physicians directly, providing a source of market discipline, regulating private insurance, and convening private participants in the market. We apply our framework to the modern healthcare systems of Germany, Sweden, Canada, and the United States, highlighting some of the implications of differences between the systems. Our central finding is that in contrast to other example healthcare systems, the United States system features a complex interplay of federal and state government influence, both direct and indirect, into physician reimbursement. We conclude the article by examining the ways in which recent legislation including the Affordable Care Act and the Medicare Access and CHIP Reauthorization Act would likely change the role of government in physician reimbursement in the United States. Copyright © 2016 Southern Society for Clinical Investigation. Published by Elsevier Inc. All rights reserved.
Fatal injuries in offshore oil and gas operations - United States, 2003-2010.
2013-04-26
During 2003-2010, the U.S. oil and gas extraction industry (onshore and offshore, combined) had a collective fatality rate seven times higher than for all U.S. workers (27.1 versus 3.8 deaths per 100,000 workers). The 11 lives lost in the 2010 Deepwater Horizon explosion provide a reminder of the hazards involved in offshore drilling. To identify risk factors to offshore oil and gas extraction workers, CDC analyzed data from the Bureau of Labor Statistics (BLS) Census of Fatal Occupational Injuries (CFOI), a comprehensive database of fatal work injuries, for the period 2003-2010. This report describes the results of that analysis, which found that 128 fatalities in activities related to offshore oil and gas operations occurred during this period. Transportation events were the leading cause (65 [51%]); the majority of these involved aircraft (49 [75%]). Nearly one fourth (31 [24%]) of the fatalities occurred among workers whose occupations were classified as "transportation and material moving." To reduce fatalities in offshore oil and gas operations, employers should ensure that the most stringent applicable transportation safety guidelines are followed.
Mitz, Andrew R
2005-10-15
Behavioral neurophysiology and other kinds of behavioral research often involve the delivery of liquid rewards to experimental subjects performing some kind of operant task. Available systems use gravity or pumps to deliver these fluids, but such methods are poorly suited to moment-to-moment control of the volume, timing, and type of fluid delivered. The design described here overcomes these limitations using an electronic control unit, a pressurized reservoir unit, and an electronically controlled solenoid. The control unit monitors reservoir pressure and provides precisely timed solenoid activation signals. It also stores calibration tables and does on-the-fly interpolation to support computer-controlled delivery calibrated directly in milliliters. The reservoir provides pressurized liquid to a solenoid mounted near the subject. Multiple solenoids, each supplied by a separate reservoir unit and control unit, can be stacked in close proximity to allow instantaneous selection of which liquid reward is delivered. The precision of droplet delivery was verified by weighing discharged droplets on a commercial analytical balance.
Advanced Modular Power Approach to Affordable, Supportable Space Systems
NASA Technical Reports Server (NTRS)
Oeftering, Richard C.; Kimnach, Greg L.; Fincannon, James; Mckissock,, Barbara I.; Loyselle, Patricia L.; Wong, Edmond
2013-01-01
Recent studies of missions to the Moon, Mars and Near Earth Asteroids (NEA) indicate that these missions often involve several distinct separately launched vehicles that must ultimately be integrated together in-flight and operate as one unit. Therefore, it is important to see these vehicles as elements of a larger segmented spacecraft rather than separate spacecraft flying in formation. The evolution of large multi-vehicle exploration architecture creates the need (and opportunity) to establish a global power architecture that is common across all vehicles. The Advanced Exploration Systems (AES) Modular Power System (AMPS) project managed by NASA Glenn Research Center (GRC) is aimed at establishing the modular power system architecture that will enable power systems to be built from a common set of modular building blocks. The project is developing, demonstrating and evaluating key modular power technologies that are expected to minimize non-recurring development costs, reduce recurring integration costs, as well as, mission operational and support costs. Further, modular power is expected to enhance mission flexibility, vehicle reliability, scalability and overall mission supportability. The AMPS project not only supports multi-vehicle architectures but should enable multi-mission capability as well. The AMPS technology development involves near term demonstrations involving developmental prototype vehicles and field demonstrations. These operational demonstrations not only serve as a means of evaluating modular technology but also provide feedback to developers that assure that they progress toward truly flexible and operationally supportable modular power architecture.
Optimal Operation of Energy Storage in Power Transmission and Distribution
NASA Astrophysics Data System (ADS)
Akhavan Hejazi, Seyed Hossein
In this thesis, we investigate optimal operation of energy storage units in power transmission and distribution grids. At transmission level, we investigate the problem where an investor-owned independently-operated energy storage system seeks to offer energy and ancillary services in the day-ahead and real-time markets. We specifically consider the case where a significant portion of the power generated in the grid is from renewable energy resources and there exists significant uncertainty in system operation. In this regard, we formulate a stochastic programming framework to choose optimal energy and reserve bids for the storage units that takes into account the fluctuating nature of the market prices due to the randomness in the renewable power generation availability. At distribution level, we develop a comprehensive data set to model various stochastic factors on power distribution networks, with focus on networks that have high penetration of electric vehicle charging load and distributed renewable generation. Furthermore, we develop a data-driven stochastic model for energy storage operation at distribution level, where the distribution of nodal voltage and line power flow are modelled as stochastic functions of the energy storage unit's charge and discharge schedules. In particular, we develop new closed-form stochastic models for such key operational parameters in the system. Our approach is analytical and allows formulating tractable optimization problems. Yet, it does not involve any restricting assumption on the distribution of random parameters, hence, it results in accurate modeling of uncertainties. By considering the specific characteristics of random variables, such as their statistical dependencies and often irregularly-shaped probability distributions, we propose a non-parametric chance-constrained optimization approach to operate and plan energy storage units in power distribution girds. In the proposed stochastic optimization, we consider uncertainty from various elements, such as solar photovoltaic , electric vehicle chargers, and residential baseloads, in the form of discrete probability functions. In the last part of this thesis we address some other resources and concepts for enhancing the operation of power distribution and transmission systems. In particular, we proposed a new framework to determine the best sites, sizes, and optimal payment incentives under special contracts for committed-type DG projects to offset distribution network investment costs. In this framework, the aim is to allocate DGs such that the profit gained by the distribution company is maximized while each DG unit's individual profit is also taken into account to assure that private DG investment remains economical.
Eggenreich, Britta; Rajamanickam, Vignesh; Wurm, David Johannes; Fricke, Jens; Herwig, Christoph; Spadiut, Oliver
2017-08-01
Cell disruption is a key unit operation to make valuable, intracellular target products accessible for further downstream unit operations. Independent of the applied cell disruption method, each cell disruption process must be evaluated with respect to disruption efficiency and potential product loss. Current state-of-the-art methods, like measuring the total amount of released protein and plating-out assays, are usually time-delayed and involve manual intervention making them error-prone. An automated method to monitor cell disruption efficiency at-line is not available to date. In the current study we implemented a methodology, which we had originally developed to monitor E. coli cell integrity during bioreactor cultivations, to automatically monitor and evaluate cell disruption of a recombinant E. coli strain by high-pressure homogenization. We compared our tool with a library of state-of-the-art methods, analyzed the effect of freezing the biomass before high-pressure homogenization and finally investigated this unit operation in more detail by a multivariate approach. A combination of HPLC and automated data analysis describes a valuable, novel tool to monitor and evaluate cell disruption processes. Our methodology, which can be used both in upstream (USP) and downstream processing (DSP), describes a valuable tool to evaluate cell disruption processes as it can be implemented at-line, gives results within minutes after sampling and does not need manual intervention.
USA Homeland Security: A Model for the United Arab Emirates
2009-03-24
aboard and 11 on the ground were killed. Al-Qaeda involvement was suspected in the February 26, 1993 bomb explosion in a basement garage of the World...critical area concerning security was not added to the DHS structure until Congress passed the Intelligence Reform and Terrorism Act of 2004.19 To...announced a six-point agenda to ensure that Department policies, operations and structures were providing the instruments needed to address both present
Automated Water-Purification System
NASA Technical Reports Server (NTRS)
Ahlstrom, Harlow G.; Hames, Peter S.; Menninger, Fredrick J.
1988-01-01
Reverse-osmosis system operates and maintains itself with minimal human attention, using programmable controller. In purifier, membranes surround hollow cores through which clean product water flows out of reverse-osmosis unit. No chemical reactions or phase changes involved. Reject water, in which dissolved solids concentrated, emerges from outer membrane material on same side water entered. Flow controls maintain ratio of 50 percent product water and 50 percent reject water. Membranes expected to last from 3 to 15 years.
A History of U.S. Navy Airborne and Shipboard Periscope Detection Radar Design and Development
2014-01-01
military applications were originally large ground-based units designed, developed, and employed by the British for detecting inbound German aircraft...evaluation (RDT&E) and the operational employment of PDR sensors has involved a rich and proud history of military endeavor. This history is embodied in...retire from the military and civilian workforce, their knowledge base, their memory, and the lessons learned become lost to subsequent generations
ConnectX2 In niBand Management Queues: New support for Network Of oaded
DOE Office of Scientific and Technical Information (OSTI.GOV)
Graham, Richard L; Poole, Stephen W; Shamis, Pavel
2010-01-01
This paper introduces the newly developed InfiniBand (IB) Management Queue capability, used by the Host Channel Adapter (HCA) to manage network task data flow dependancies, and progress the communications associated with such flows. These tasks include sends, receives, and the newly supported wait task, and are scheduled by the HCA based on a data dependency description provided by the user. This functionality is supported by the ConnectX-2 HCA, and provides the means for delegating collective communication management and progress to the HCA, also known as collective communication offload. This provides a means for overlapping collective communications managed by the HCAmore » and computation on the Central Processing Unit (CPU), thus making it possible to reduce the impact of system noise on parallel applications using collective operations. This paper further describes how this new capability can be used to implement scalable Message Passing Interface (MPI) collective operations, describing the high level details of how this new capability is used to implement the MPI Barrier collective operation, focusing on the latency sensitive performance aspects of this new capability. This paper concludes with small scale benchmark experiments comparing implementations of the barrier collective operation, using the new network offload capabilities, with established point-to-point based implementations of these same algorithms, which manage the data flow using the central processing unit. These early results demonstrate the promise this new capability provides to improve the scalability of high-performance applications using collective communications. The latency of the HCA based implementation of the barrier is similar to that of the best performing point-to-point based implementation managed by the central processing unit, starting to outperform these as the number of processes involved in the collective operation increases.« less
Abarro, P A
1987-01-01
The Colombo Plan was established in 1950 as a regional intergovernmental organization for co-operative economic and social development in Asia and the Pacific comprising 26 member States. The permanent secretariat is the Colombo Plan Bureau to which is attached the Drug Advisory Programme (DAP) headed by a drug adviser, who consults with Governments and helps develop co-operative programmes for drug abuse prevention and control. DAP functions in close liaison and co-operation with organizations of the United Nations system and other regional and international organizations in pursuing activities in line with the international strategy and policies for drug control of the United Nations. DAP assists member States in creating public awareness of the dangers of drug abuse and drug trafficking through the use of mass media, seminars, workshops and conferences and study exchange programmes. It assists Governments in updating their drug laws and in establishing special drug units and national co-ordinating bodies on drug abuse control. DAP encourages and supports the utilization of community resources and the activities of non-governmental organizations and voluntary bodies for the prevention and reduction of drug abuse, as well as the use of mass media for more co-ordinated efforts in this area. It assists member States in developing human resources and technical expertise of personnel in the various disciplines of law enforcement, prevention, treatment and rehabilitation, through training, seminars, study exchange fellowship programmes and research. DAP also assists in promoting co-operation at the regional and interregional levels, and is involved in developing and strengthening co-operation between agencies of member States that deal with drug problems.
40 CFR 60.2070 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of... requirements? (a) No CISWI unit can be operated unless a fully trained and qualified CISWI unit operator is... unit operator may operate the CISWI unit directly or be the direct supervisor of one or more other...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Gilliam, T.M.
1991-05-01
This Project Quality Assurance Plan (PQAP) sets forth the quality assurance (QA) requirements that are applied to those elements of the Westinghouse Materials Company of Ohio (WMCO) Operable Unit 1 support at Oak Ridge National Laboratory (ORNL) project that involve research and development (R D) performed at ORNL. This is in compliance with the applicable criteria of 10 CFR Part 50, Appendix B, ANSI/ASME NQA-1, as specified by Department of Energy (DOE) Oak Ridge Operations (ORO) Order 5700.6B. For this application, NQA-1 is the core QA Program requirements document. QA policy, normally found in the requirements document, is contained herein.more » The requirements of this PQAP apply to project activities that affect the quality and reliability/credibility of research, development, and investigative data and documentation. These activities include the functions of attaining quality objectives and assuring that an appropriate QA program scope is established. The scope of activities affecting quality includes organization; personnel training and qualifications; design control; procurement; material handling and storage; operating procedures; testing, surveillance, and auditing; R D investigative activities and documentation; deficiencies; corrective actions; and QA record keeping. 12 figs.« less
Fiedler, Edna R; Carpenter, Frank E
2005-06-01
This paper presents a brief history of psychology and psychiatry roles in psychological selection and how these roles have evolved into the Behavioral Sciences Branch at the Johnson Space Center USC), Houston, TX. Since the initial selection of the Mercury Seven, the first United States astronauts, psychologists and psychiatrists have been involved in astronaut selection activities. Initially very involved in psychological selection of astronauts, the role of behavioral health specialists waned during the Gemini and Apollo years. With the onset of the NASA/Mir/International Space Station Program, the introduction of payload and mission specialists, and international collaboration, the evolving need for behavioral health expertise became apparent. Medical and psychological selection processes were revisited and the Johnson Space Center developed a separate operational unit focused on behavioral health and performance. This work unit eventually became the Behavioral Sciences branch of the Space Medicine and Health Care Systems Office. Research was allocated across groups at JSC, other NASA space centers, and the National Space Biomedical Research Institute, and was funded by NASA Headquarters. The current NASA focus on human space exploration to the Moon and beyond re-emphasizes the importance of the human-centered approach.
Paolucci, Ginevra; Cagnasso, Daniela; Cassani, Francesco
2015-01-01
In the last decade, the European Union has reinforced the concept of animal welfare throughout the food chain, from breeding to slaughtering. Studies and assessments of economic nature led to the adoption of Regulation EC 1099/2009 and at the end of 2014 this regulation will be applied to all the members involved in the food chain. For this reason several local health units organized different initiatives. The local health unit of Turin no. 4 (ASLTO4) has developed a project aimed to train food business operators (FBO) to fulfill all the criteria developed in this Regulation. This initiative was divided into four steps: i) communication to the companies about the criteria of the new regulation; ii) a training course for official veterinarians; iii) slaughterhouse audits in order to get information about animal welfare; iv) and a training course for the personnel involved in slaughterhouses. The purpose of this paper was to report the results of the audits in order to identify critical points of structural, instrumental and documentary facilities. Then, the results can be compared with similar studies in order to develop common strategies and intervention areas. PMID:27800389
Study of EVA operations associated with satellite services
NASA Technical Reports Server (NTRS)
Nash, J. O.; Wilde, R. D.
1982-01-01
Extravehicular mobility unit (EMU) factors associated with satellite servicing activities are identified and the EMU improvements necessary to enhance satellite servicing operations are outlined. Areas of EMU capabilities, equipment and structural interfaces, time lines, EMU modifications for satellite servicing, environmental hazards, and crew training are vital to manned Eva/satellite services and as such are detailed. Evaluation of EMU capabilities indicates that the EMU can be used in performing near term, basic satellite servicing tasks; however, satellite servicing is greatly enhanced by incorporating key modifications into the EMU. The servicing missions involved in contamination sensitive payload repair are illustrated. EVA procedures and equipment can be standardized, reducing both crew training time and in orbit operations time. By standardizing and coordinating procedures, mission cumulative time lines fall well within the EMU capability.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Howe, Gary; Albritton, John; Denton, David
In September 2010, RTI and the DOE/NETL signed a cooperative agreement (DE-FE000489) to design, build, and operate a pre-commercial syngas cleaning system that would capture up to 90% of the CO 2 in the syngas slipstream, and demonstrate the ability to reduce syngas contaminants to meet DOE’s specifications for chemical production application. This pre-commercial syngas cleaning system is operated at Tampa Electric Company’s (TEC) 250-MWe integrated gasification combined cycle (IGCC) plant at Polk Power Station (PPS), located near Tampa, Florida. The syngas cleaning system consists of the following units: Warm Gas Desulfurization Process (WDP) - this unit processes a syngasmore » flow equivalent of 50 MWe of power (50 MWe equivalent corresponds to about 2.0 MM scfh of syngas on dry basis) to produce a desulfurized syngas with a total sulfur (H 2S+COS) concentration ~ 10 ppmv. Water Gas Shift (WGS) Reactor - this unit converts sufficient CO into CO 2 to enable 90% capture of the CO 2 in the syngas slipstream. This reactor uses conventional commercial shift catalyst technologies. Low Temperature Gas Cooling (LTGC) - this unit cools the syngas for the low temperature activated MDEA process and separates any condensed water. Activated MDEA Process (aMDEA) - this unit employs a non-selective separation for the CO 2 and H 2S present in the raw syngas stream. Because of the selective sulfur removal by the upstream WDP unit, the CO 2 capture target of 90% CO 2 can be achieved with the added benefit that total sulfur concentration in the CO 2 product is < 100 ppmv. An additional advantage of the activated MDEA process is that the non-selective sulfur removal from the treated syngas reduces sulfur in the treated gas to very low sub-ppmv concentrations, which are required for chemical production applications. Testing to date of this pre-commercial syngas cleaning system has shown that the technology has great potential to provide clean syngas from coal and petcoke-based gasification at increased efficiency and at significantly lower capital and operating costs than conventional syngas cleanup technologies. However, before the technology can be deemed ready for scale-up to a full commercial-scale demonstration, additional R&D testing is needed at the site to address the following critical technical risks: WDP sorbent stability and performance; Impact of WDP on downstream cleanup and conversion steps; Metallurgy and refractory; Syngas cleanup performance and controllability; Carbon capture performance and additional syngas cleanup The proposed plan to acquire this additional R&D data involves: Operation of the units to achieve an additional 3,000 hours of operation of the system within the performance period, with a target of achieving 1,000 hours of those hours via continuous operation of the entire integrated pre-commercial demonstration system; Rapid turnaround of repairs and/or modifications required as necessary to return any specific unit to operating status with documentation and lessons learned to support technology maturation, and; Proactive performance of maintenance activities during any unplanned outages and if possible while operating.« less
Building NYX [Engineering Materials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-01-01
From April, 1951, to August 1954, New York Shipbuilding corporation carried out a subcontract with E.I. du Pont de Nemours company that was without parallel in the shipyard's history. The work, designated the NYX Project'' for reasons of security, which was vital to the operations of the Savannah River Plant, Aiken, S.C., which was then being designed and constructed by du Pont for the Atomic Energy Commission. It consisted of three broad parts: Development and experimental work; fabrication and testing of a prototype unit; and fabrication of production units. Five production units were ultimately built, one of them converted frommore » the prototype. All were fabricated from stainless steel, and involved welding techniques, control of thermal distortion and tolerances never previously attempted on assemblies of comparable size. This report provides engineering drawings for this project.« less
Building NYX [Engineering Materials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-12-31
From April, 1951, to August 1954, New York Shipbuilding corporation carried out a subcontract with E.I. du Pont de Nemours & company that was without parallel in the shipyard`s history. The work, designated the ``NYX Project`` for reasons of security, which was vital to the operations of the Savannah River Plant, Aiken, S.C., which was then being designed and constructed by du Pont for the Atomic Energy Commission. It consisted of three broad parts: Development and experimental work; fabrication and testing of a prototype unit; and fabrication of production units. Five production units were ultimately built, one of them convertedmore » from the prototype. All were fabricated from stainless steel, and involved welding techniques, control of thermal distortion and tolerances never previously attempted on assemblies of comparable size. This report provides engineering drawings for this project.« less
John Foster Dulles, his medical history and its impact on Cold War politics.
Pappas, Theodore N; Willett, Christopher G
2018-01-01
John Foster Dulles was the United States Secretary of State during the administration of President Dwight D Eisenhower. At the height of the Cold War, Dulles was Eisenhower's emissary, traveling over 450,000 international miles, leading United States foreign policy. In November of 1956, during an international crisis involving the Suez Canal, Dulles became ill and underwent an operation for a perforated colon cancer. During much of his impactful term as Secretary of State, Dulles was being treated for this cancer that ultimately resulted in his death in May of 1959. This paper highlights the medical care of John Foster Dulles and the global events during his illness.
Nonlinear adaptive control of grid-connected three-phase inverters for renewable energy applications
NASA Astrophysics Data System (ADS)
Mahdian-Dehkordi, N.; Namvar, M.; Karimi, H.; Piya, P.; Karimi-Ghartemani, M.
2017-01-01
Distributed generation (DG) units are often interfaced to the main grid using power electronic converters including voltage-source converters (VSCs). A VSC offers dc/ac power conversion, high controllability, and fast dynamic response. Because of nonlinearities, uncertainties, and system parameters' changes involved in the nature of a grid-connected renewable DG system, conventional linear control methods cannot completely and efficiently address all control objectives. In this paper, a nonlinear adaptive control scheme based on adaptive backstepping strategy is presented to control the operation of a grid-connected renewable DG unit. As compared to the popular vector control technique, the proposed controller offers smoother transient responses, and lower level of current distortions. The Lyapunov approach is used to establish global asymptotic stability of the proposed control system. Linearisation technique is employed to develop guidelines for parameters tuning of the controller. Extensive time-domain digital simulations are performed and presented to verify the performance of the proposed controller when employed in a VSC to control the operation of a two-stage DG unit and also that of a single-stage solar photovoltaic system. Desirable and superior performance of the proposed controller is observed.
Evaluation of Staff’s Job Satisfaction in the Spinal Cord Unit in Italy
Laura, Cominetti; Lorenza, Garrino; Rita, Decorte; Nadia, Felisi; Ebe, Matta; Vittoria, Actis Maria; Roberto, Carone; Silvano, Gregorino; Valerio, Dimonte
2013-01-01
In July 2007 a Spinal Cord Unit was set up in Turin (Italy) within the newly integrated structure of the Orthopaedic Traumatologic Centre, warranting a multidisciplinary and professional approach according to International Guidelines. This approach will be possible through experimentation of a personalized care model. To analyze job satisfaction of health care professionals operating within the Spinal Cord Unit, preliminary to organizational change. Data collection was carried out by using questionnaires, interviews, shadowing. Results from quantitative analysis on the self-filled questionnaires were integrated with results from qualitative analysis. All the health care professionals operating in the field were involved. Positive aspects were the perception of carrying out a useful job, the feeling of personal fulfilment and the wish to engage new energies and resources. Problematic aspects included role conflict among staff categories and communication with managers. The positive aspects can be exploited to create professional practices facilitating role and expertise integration, information spreading and staff identification within the organization rather than team work. Data of job satisfaction and self efficacy of health care workers can be considered basic requirement before implementing an organizational change. The main challenges is multiprofessional collaboration. PMID:23750186
How to choose the right operational police behavioral health specialist (OPBHS).
Greenstone, James L
2012-01-01
A recent article (Dennis, December 2011) stressed the need to consider the factors necessary when selecting an operational police physician. It seems apparent that equal attention should be given to the selection of the Operational Police Behavioral Health Specialist or Police Psychologist (OPBHS). This is intended to round-out selection considerations for these two important and essential positions on both Special Weapons and Tactics Teams as well as on Police Hostage and Crisis Negotiations Teams. Such considerations are crucial whether these teams are operationalized together separately, or as part of the same unit. The previous outline headings, with some additions, will be utilized specifically to deal with the Operational Police Behavioral Health Specialist. Also, see Greenstone (2005). The issues to be considered for the OPBHS are: Candidate selection. (Also see Greenstone, 2005), Duties, Administrative, Clinical, Training involvement, Relationships, Liability and coverage (Dennis, 2011), Other considerations.
Comparison of Wind Power and Load Forecasting Error Distributions: Preprint
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hodge, B. M.; Florita, A.; Orwig, K.
2012-07-01
The introduction of large amounts of variable and uncertain power sources, such as wind power, into the electricity grid presents a number of challenges for system operations. One issue involves the uncertainty associated with scheduling power that wind will supply in future timeframes. However, this is not an entirely new challenge; load is also variable and uncertain, and is strongly influenced by weather patterns. In this work we make a comparison between the day-ahead forecasting errors encountered in wind power forecasting and load forecasting. The study examines the distribution of errors from operational forecasting systems in two different Independent Systemmore » Operator (ISO) regions for both wind power and load forecasts at the day-ahead timeframe. The day-ahead timescale is critical in power system operations because it serves the unit commitment function for slow-starting conventional generators.« less
Romics, Laszlo; Macaskill, E Jane; Fernandez, Teresa; Simpson, Louise; Morrow, Elizabeth; Pitsinis, Vassilis; Tovey, Sian; Barber, Matthew; Masannat, Yazan; Stallard, Sheila; Weiler-Mithoff, Eva; Malyon, Andrew; Mansell, James; Campbell, Esther J; Doughty, Julie; Dixon, J Michael
2018-04-13
Current evidence for oncoplastic breast conservation (OBC) is based on single institutional series. Therefore, we carried out a population-based audit of OBC practice and outcomes in Scotland. A predefined database of patients treated with OBC was completed retrospectively in all breast units practicing OBC in Scotland. 589 patients were included from 11 units. Patients were diagnosed between September 2005 and March 2017. High volume units performed a mean of 19.3 OBCs per year vs. low volume units who did 11.1 (p = 0.012). 23 different surgical techniques were used. High volume units offered a wider range of techniques (8-14) than low volume units (3-6) (p = 0.004). OBC was carried out as a joint operation involving a breast and a plastic surgeon in 389 patients. Immediate contralateral symmetrisation rate was significantly higher when OBC was performed as a joint operation (70.7% vs. not joint operations: 29.8%; p < 0.001). The incomplete excision rate was 10.4% and was significantly higher after surgery for invasive lobular carcinoma (18.9%; p = 0.0292), but was significantly lower after neoadjuvant chemotherapy (3%; p = 0.031). 9.2% of patients developed major complications requiring hospital admission. Overall the complication rate was significantly lower after neoadjuvant chemotherapy (p = 0.035). The 5 year local recurrence rate was 2.7%, which was higher after OBC for DCIS (8.3%) than invasive ductal cancer (1.6%; p = 0.026). 5-year disease-free survival was 91.7%, overall survival was 93.8%, and cancer-specific survival was 96.1%. This study demonstrated that measured outcomes of OBC in a population-based multi-centre setting can be comparable to the outcomes of large volume single centre series. Copyright © 2018 Elsevier Ltd, BASO ~ The Association for Cancer Surgery, and the European Society of Surgical Oncology. All rights reserved.
Experience with an integrated control and monitoring system at the El Segundo generating station
DOE Office of Scientific and Technical Information (OSTI.GOV)
Papilla, R.P.; McKinley, J.H.; Blanco, M.A.
1992-01-01
This paper describes the EPRI/Southern California Edison (SCE) El Segundo Integrated Control and Monitoring System (ICMS) project and relates key project experiences. The ICMS project is a cost-shared effort between EPRI and SCE designed to address the issues involved with integrating power plant diagnostic and condition monitoring with control. A digital distributed control system retrofit for SCE's El Segundo Units 3 and 4 provided the case study. although many utilities have retrofitted power plant units with distributed control systems (DCS's) and have applied diagnostics and monitoring programs to improve operations and performance, the approach taken in this project, that is,more » integrating the monitoring function with the control function, is profoundly new and unique. Over the life of the El Segundo ICMS, SCE expects to realize savings form life optimization, increased operating flexibility, improved heat rate, reduced NO{sub x} emissions, and lower maintenance costs. These savings are expected to be significant over the life of the system.« less
a Weather Monitoring System for Application to Apple and Corn Production
NASA Astrophysics Data System (ADS)
Stirm, Walter Leroy
Many crop management decisions are based on weather -crop development relationships. Daily weather data is currently used in most crop development research and applied models. Present weather and computer technology now makes possible monitoring of crop development on a realtime basis. This research tests a method of computing crop sensitive temperatures for corn and apple using standard hourly meteorological data. The method also makes use of detailed plant physiological stage measurements to determine timing of vital cultural operations tied to the observed weather conditions. The sensitive temperature method incorporates very short term weather variability accounting for changes in the cloud cover, radiation rates, evaporative cooling and other factors involved in the plant's energy balance. The relationship of plant and weather measurements are also used to determine corn emergence, corn grain drydown rate and fruit harvest duration. The monitoring system also incorporates a crop growth unit forecast technique employing short and medium range temperature forecasts of the National Weather Service. The projections of growth units are made for five and ten days into the future. Predicted growth unit accumulations are compared to historical growth unit accumulations to determine the forecast stage. The sensitive temperature crop monitoring system removes some of the error involved in evaluation of growth units by average daily temperature. Carry over maximum and minimums, extended duration of warm or cool periods within the day and disruption of diurnal temperature curve by passage of fronts are eliminated.
Concept and design engineering: endourology operating room.
Sabnis, Ravindra; Ganesamoni, Raguram; Mishra, Shashikant; Sinha, Lokesh; Desai, Mahesh R
2013-03-01
A dedicated operating room with fluoroscopic imaging capability and adequate data connectivity is important to the success of any endourology program. Proper understanding of the recent developments in technology in relation to operating room is necessary before planning an endourology operating room. An endourology operating room is a fluorocompatible operating room with enough space to accommodate equipment like multiple flat monitors to display video, C-arm with its monitor, ultrasonography machine, laser machine, intracorporeal lithotripsy unit, irrigation pumps and two large trolleys with instruments. This operating room is integrated with devices to continuously record and archive data from endovision and surface cameras, ultrasound and fluoroscopy. Moreover, advances made in data relay systems have created seamless two-way communication between the operating room and electronic medical records, radiological picture archiving and communication system, classroom, auditorium and literally anywhere in the world. A dedicated endourology operating room is required for any hospital, which has a significant amount of endourology procedures. A custom-made integrated endourology operating room will facilitate endourology procedures, smoothen the workflow in operating room and improve patient outcomes. Meticulous planning and involving experts in the field are critical for the success of the project.
Percutaneous dilatational versus conventional surgical tracheostomy in intensive care patients
Youssef, Tarek F.; Ahmed, Mohamed Rifaat; Saber, Aly
2011-01-01
Background: Tracheostomy is usually performed in patients with difficult weaning from mechanical ventilation or some catastrophic neurologic insult. Conventional tracheostomy involves dissection of the pretracheal tissues and insertion of the tracheostomy tube into the trachea under direct vision. Percutaneous dilatational tracheostomy is increasingly popular and has gained widespread acceptance in many intensive care unit and trauma centers. Aim: Aim of the study was to compare percutaneous dilatational tracheostomy versus conventional tracheostomy in intensive care patients. Patients and Methods: 64 critically ill patients admitted to intensive care unit subjected to tracheostomy and randomly divided into two groups; percutaneous dilatational tracheostomy and conventional tracheostomy. Results: Mean duration of the procedure was similar between the two procedures while the mean size of tracheostomy tube was smaller in percutaneous technique. In addition, the Lowest SpO2 during procedure, PaCO2 after operation and intra-operative bleeding for both groups were nearly similar without any statistically difference. Postoperative infection after 7 days seen to be statistically lowered and the length of scar tend to be smaller among PDT patients. Conclusion: PDT technique is effective and safe as CST with low incidence of post operative complication. PMID:22361497
21 CFR 872.6640 - Dental operative unit and accessories.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Dental operative unit and accessories. 872.6640... (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Miscellaneous Devices § 872.6640 Dental operative unit and accessories. (a) Identification. A dental operative unit and accessories is an AC-powered device that is...
21 CFR 872.6640 - Dental operative unit and accessories.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Dental operative unit and accessories. 872.6640... (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Miscellaneous Devices § 872.6640 Dental operative unit and accessories. (a) Identification. A dental operative unit and accessories is an AC-powered device that is...
21 CFR 872.6640 - Dental operative unit and accessories.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Dental operative unit and accessories. 872.6640... (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Miscellaneous Devices § 872.6640 Dental operative unit and accessories. (a) Identification. A dental operative unit and accessories is an AC-powered device that is...
21 CFR 872.6640 - Dental operative unit and accessories.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Dental operative unit and accessories. 872.6640... (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Miscellaneous Devices § 872.6640 Dental operative unit and accessories. (a) Identification. A dental operative unit and accessories is an AC-powered device that is...
21 CFR 872.6640 - Dental operative unit and accessories.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Dental operative unit and accessories. 872.6640... (CONTINUED) MEDICAL DEVICES DENTAL DEVICES Miscellaneous Devices § 872.6640 Dental operative unit and accessories. (a) Identification. A dental operative unit and accessories is an AC-powered device that is...
1945-08-18
were interconnected, how? ever,, it was found that one of the oscillators had an intermit - tent, defect-. This trouble was cleared by removing the...switches> i.e., two pairsL are included in.the unit," one of ä pair of selectors {the " fast selector") steps .each time the latch operates, the other (the...34slow seleotor") steps oiice eaoh time the fast seleotor completes 25 steps. Thus, a total of 625 steps, or changes in permutation, is involved be
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anton, David
The proposed project built on the foundation of over several years years of intensive and ground-breaking R&D work at Cellana's Kona Demonstration Facility (KDF). Phycological and engineering solutions were provided to tackle key cultivation issues and technical barriers limiting algal biomass productivity identified through work conducted outdoors at industrial (1 acre) scale. The objectives of this project were to significantly improve algal biomass productivity and reduce operational cost in a seawater-based system, using results obtained from two top-performing algal strains as the baseline while technically advancing and more importantly, integrating the various unit operations involved in algal biomass production, processing,more » and refining.« less
The Perils of Paul: Near Disasters in Airborne Radiochemical Sampling
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meade, Roger Allen
Beginning with the Trinity test in July 1945, Laboratory radiochemists have collected debris from nuclear tests by various means. At Trinity, two United States Army Sherman tanks were used. Beginning with Operation Crossroads and continuing throughout atmospheric testing, aircraft were used to fly in and around mushroom clouds to collect debris. Paul Guthals, the LASL project leader for sampling operations, flew on many of the B-57 sampling missions. Two such missions, one flown over the Nevada Test and one in the skies near Johnston Atoll, again proved the dangers involved in collecting airborne test debris. The events of these twomore » missions are briefly recounted.« less
Laminar Flow Control Leading Edge Systems in Simulated Airline Service
NASA Technical Reports Server (NTRS)
Wagner, R. D.; Maddalon, D. V.; Fisher, D. F.
1988-01-01
Achieving laminar flow on the wings of a commercial transport involves difficult problems associated with the wing leading edge. The NASA Leading Edge Flight Test Program has made major progress toward the solution of these problems. The effectiveness and practicality of candidate laminar flow leading edge systems were proven under representative airline service conditions. This was accomplished in a series of simulated airline service flights by modifying a JetStar aircraft with laminar flow leading edge systems and operating it out of three commercial airports in the United States. The aircraft was operated as an airliner would under actual air traffic conditions, in bad weather, and in insect infested environments.
Enabling CSPA Operations Through Pilot Involvement in Longitudinal Approach Spacing
NASA Technical Reports Server (NTRS)
Battiste, Vernol (Technical Monitor); Pritchett, Amy
2003-01-01
Several major airports around the United States have, or plan to have, closely-spaced parallel runways. This project complemented current and previous research by examining the pilots ability to control their position longitudinally within their approach stream.This project s results considered spacing for separation from potential positions of wake vortices from the parallel approach. This preventive function could enable CSPA operations to very closely spaced runways. This work also considered how pilot involvement in longitudinal spacing could allow for more efficient traffic flow, by allowing pilots to keep their aircraft within tighter arrival slots then air traffic control (ATC) might be able to establish, and by maintaining space within the arrival stream for corresponding departure slots. To this end, this project conducted several research studies providing an analytic and computational basis for calculating appropriate aircraft spacings, experimental results from a piloted flight simulator test, and an experimental testbed for future simulator tests. The following sections summarize the results of these three efforts.
2013-04-26
Before the 1970s, the United States sometimes disposed of at sea excess, obsolete, or unserviceable munitions, including chemical munitions. Chemical munitions known to have been disposed of at sea included munitions filled with sulfur mustard, a vesicant (i.e., an agent that causes chemical burns or blisters of the skin and mucous membranes). Signs and symptoms of exposure to a mustard agent can include redness and blistering of the skin, eye irritation, rhinorrhea, hoarseness, shortness of breath, and (rarely) diarrhea and abdominal discomfort. Since 2004, CDC has received notification of three separate incidents of exposure to sulfur mustard munitions. In one incident, a munition was found with ocean-dredged marine shells used to pave a driveway. The other two incidents involved commercial clam fishing operations. This report highlights the importance of considering exposure to sulfur mustard in the differential diagnosis of signs and symptoms compatible with exposure to a vesicant agent, especially among persons involved with clam fishing or sea dredging operations.
NIC atomic operation unit with caching and bandwidth mitigation
Hemmert, Karl Scott; Underwood, Keith D.; Levenhagen, Michael J.
2016-03-01
A network interface controller atomic operation unit and a network interface control method comprising, in an atomic operation unit of a network interface controller, using a write-through cache and employing a rate-limiting functional unit.
Design of large Francis turbine using optimal methods
NASA Astrophysics Data System (ADS)
Flores, E.; Bornard, L.; Tomas, L.; Liu, J.; Couston, M.
2012-11-01
Among a high number of Francis turbine references all over the world, covering the whole market range of heads, Alstom has especially been involved in the development and equipment of the largest power plants in the world : Three Gorges (China -32×767 MW - 61 to 113 m), Itaipu (Brazil- 20x750 MW - 98.7m to 127m) and Xiangjiaba (China - 8x812 MW - 82.5m to 113.6m - in erection). Many new projects are under study to equip new power plants with Francis turbines in order to answer an increasing demand of renewable energy. In this context, Alstom Hydro is carrying out many developments to answer those needs, especially for jumbo units such the planned 1GW type units in China. The turbine design for such units requires specific care by using the state of the art in computation methods and the latest technologies in model testing as well as the maximum feedback from operation of Jumbo plants already in operation. We present in this paper how a large Francis turbine can be designed using specific design methods, including the global and local optimization methods. The design of the spiral case, the tandem cascade profiles, the runner and the draft tube are designed with optimization loops involving a blade design tool, an automatic meshing software and a Navier-Stokes solver, piloted by a genetic algorithm. These automated optimization methods, presented in different papers over the last decade, are nowadays widely used, thanks to the growing computation capacity of the HPC clusters: the intensive use of such optimization methods at the turbine design stage allows to reach very high level of performances, while the hydraulic flow characteristics are carefully studied over the whole water passage to avoid any unexpected hydraulic phenomena.
Thompson, Heather; Legorreta, Kimberly; Maher, Mary Ann; Lavin, Melanie M
Our health system recognized the need to update facility space and associated technology for the labor and birth unit within our large volume perinatal service to improve the patient experience, and enhance safety, quality of care, and staff satisfaction. When an organization decides to invest $30 million dollars in a construction project such as a new labor and birth unit, many factors and considerations are involved. Financial support, planning, design, and construction phases of building a new unit are complex and therefore require strong interdisciplinary collaboration, leadership, and project management. The new labor and birth unit required nearly 3 years of planning, designing, and construction. Patient and family preferences were elicited through consumer focus groups. Multiple meetings with the administrative and nursing leadership teams, staff nurses, nurse midwives, and physicians were held to generate ideas for improvement in the new space. Involving frontline clinicians and childbearing women in the process was critical to success. The labor and birth unit moved to a new patient tower in a space that was doubled in square footage and geographically now on three separate floors. In the 6 months prior to the move, many efforts were made in our community to share our new space. The marketing strategy was very detailed and creative with ongoing input from the nursing leadership team. The nursing staff was involved in every step along the way. It was critical to have champions as workflow teams emerged. We hosted simulation drills and tested scenarios with new workflows. Move day was rehearsed with representatives of all members of the perinatal team participating. These efforts ultimately resulted in a move time of ~5 hours. Birth volumes increased 7% within the first 6 months. After 3 years in our new space, our birth volumes have risen nearly 15% and are still growing. Key processes and roles responsible for a successful build, efficient and safe move day, and optimal operational utility, as anticipated, of a new labor and birth unit in a large volume perinatal service are detailed.
Increasing relational memory in childhood with unitization strategies.
Robey, Alison; Riggins, Tracy
2018-01-01
Young children often experience relational memory failures, which are thought to result from immaturity of the recollection processes presumed to be required for these tasks. However, research in adults has suggested that relational memory tasks can be accomplished using familiarity, a process thought to be mature by the end of early childhood. The goal of the present study was to determine whether relational memory performance could be improved in childhood by teaching young children memory strategies that have been shown to increase the contribution of familiarity in adults (i.e., unitization). Groups of 6- and 8-year-old children were taught to use visualization strategies that either unitized or did not unitize pictures and colored borders. Estimates of familiarity and recollection were extracted by fitting receiver operator characteristic curves (Yonelinas, Journal of Experimental Psychology: Learning, Memory, and Cognition 20, 1341-1354, 1994, Yonelinas, Memory & Cognition 25, 747-763, 1997) based on dual-process models of recognition. Bayesian analysis revealed that strategies involving unitization improved memory performance and increased the contribution of familiarity in both age groups.
40 CFR 60.2635 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines... CISWI unit can be operated unless a fully trained and qualified CISWI unit operator is accessible... operator may operate the CISWI unit directly or be the direct supervisor of one or more other plant...
40 CFR 60.2635 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emissions Guidelines... CISWI unit can be operated unless a fully trained and qualified CISWI unit operator is accessible... operator may operate the CISWI unit directly or be the direct supervisor of one or more other plant...
Safeguard monitoring of direct electrolytic reduction
NASA Astrophysics Data System (ADS)
Jurovitzki, Abraham L.
Nuclear power is regaining global prominence as a sustainable energy source as the world faces the consequences of depending on limited fossil based, CO2 emitting fuels. A key component to achieving this sustainability is to implement a closed nuclear fuel cycle. Without achieving this goal, a relatively small fraction of the energy value in nuclear fuel is actually utilized. This involves recycling of spent nuclear fuel (SNF)---separating fissile actinides from waste products and using them to fabricate fresh fuel. Pyroprocessing is a viable option being developed for this purpose with a host of benefits compared to other recycling options, such as PUREX. Notably, pyroprocessing is ill suited to separate pure plutonium from spent fuel and thus has non-proliferation benefits. Pyroprocessing involves high temperature electrochemical and chemical processing of SNF in a molten salt electrolyte. During this batch process, several intermediate and final streams are produced that contain radioactive material. While pyroprocessing is ineffective at separating pure plutonium, there are various process misuse scenarios that could result in diversion of impure plutonium into one or more of these streams. This is a proliferation risk that should be addressed with innovative safeguards technology. One approach to meeting this challenge is to develop real time monitoring techniques that can be implemented in the hot cells and coupled with the various unit operations involved with pyroprocessing. Current state of the art monitoring techniques involve external chemical assaying which requires sample removal from these unit operations. These methods do not meet International Atomic Energy Agency's (IAEA) timeliness requirements. In this work, a number of monitoring techniques were assessed for their viability as online monitoring tools. A hypothetical diversion scenario for the direct electrolytic reduction process was experimentally verified (using Nd2O3 as a surrogate for PuO2). Electrochemical analysis was demonstrated to be effective at detecting even very dilute concentrations of actinides as evidence for a diversion attempt.
High internal free volume compositions for low-k dielectric and other applications
NASA Technical Reports Server (NTRS)
Bouffard, Jean (Inventor); Swager, Timothy M. (Inventor)
2010-01-01
The present invention provides materials, devices, and methods involving new heterocyclic, shape-persistent monomeric units with internal free volume. In some cases, materials the present invention may comprise monomers, oligomers, or polymers that incorporate a heterocyclic, shape-persistent iptycene. The present invention may provide materials having low dielectric constants and improved stability at high operating temperatures due to the electron-poor character of materials. In addition, compositions of the invention may be easily synthesized and readily modified to suit a particular application.
2014-06-13
portion of this study. I would also like to thank my instructors and colleagues of Staff Group 23 Alpha. This group of instructors took great care in...organizes to support local communities and States in catastrophic incidents. This holistic approach emphasizes the need for the involvement of the whole...intelligence, medical and dental , civil affairs and military information support operations, military police, CBRN, and Soldier Support and Force generation
Donation after cardiac death and the emergency department: ethical issues.
Simon, Jeremy R; Schears, Raquel M; Padela, Aasim I
2014-01-01
Organ donation after cardiac death (DCD) is increasingly considered as an option to address the shortage of organs available for transplantation, both in the United States and worldwide. The procedures for DCD differ from procedures for donation after brain death and are likely less familiar to emergency physicians (EPs), even as this process is increasingly involving emergency departments (EDs). This article explores the ED operational and ethical issues surrounding this procedure. © 2013 by the Society for Academic Emergency Medicine.
NASA Technical Reports Server (NTRS)
Putkovich, K.
1981-01-01
Initial test results indicated that the Global Positioning System/Time Transfer Unit (GPS/TTU) performed well within the + or - 100 nanosecond range required by the original system specification. Subsequent testing involved the verification of GPS time at the master control site via portable clocks and the acquisition and tracking of as many passes of the space vehicles currently in operation as possible. A description and discussion of the testing, system modifications, test results obtained, and an evaluation of both GPS and the GPS/TTU are presented.
How do strategic decisions and operative practices affect operating room productivity?
Peltokorpi, Antti
2011-12-01
Surgical operating rooms are cost-intensive parts of health service production. Managing operating units efficiently is essential when hospitals and healthcare systems aim to maximize health outcomes with limited resources. Previous research about operating room management has focused on studying the effect of management practices and decisions on efficiency by utilizing mainly modeling approach or before-after analysis in single hospital case. The purpose of this research is to analyze the synergic effect of strategic decisions and operative management practices on operating room productivity and to use a multiple case study method enabling statistical hypothesis testing with empirical data. 11 hypotheses that propose connections between the use of strategic and operative practices and productivity were tested in a multi-hospital study that included 26 units. The results indicate that operative practices, such as personnel management, case scheduling and performance measurement, affect productivity more remarkably than do strategic decisions that relate to, e.g., units' size, scope or academic status. Units with different strategic positions should apply different operative practices: Focused hospital units benefit most from sophisticated case scheduling and parallel processing whereas central and ambulatory units should apply flexible working hours, incentives and multi-skilled personnel. Operating units should be more active in applying management practices which are adequate for their strategic orientation.
ERIC Educational Resources Information Center
Ghasem, Nayef
2016-01-01
This paper illustrates a teaching technique used in computer applications in chemical engineering employed for designing various unit operation processes, where the students learn about unit operations by designing them. The aim of the course is not to teach design, but rather to teach the fundamentals and the function of unit operation processes…
Code of Federal Regulations, 2011 CFR
2011-07-01
... properties may vary with time. For a unit operation operated in a batch mode (i.e., batch unit operation... means a unit operation operated in a batch mode. Block means the time period that comprises a single batch cycle. Combustion device burner means a device designed to mix and ignite fuel and air to provide...
Code of Federal Regulations, 2013 CFR
2013-07-01
... properties may vary with time. For a unit operation operated in a batch mode (i.e., batch unit operation... means a unit operation operated in a batch mode. Block means the time period that comprises a single batch cycle. Combustion device burner means a device designed to mix and ignite fuel and air to provide...
Code of Federal Regulations, 2012 CFR
2012-07-01
... properties may vary with time. For a unit operation operated in a batch mode (i.e., batch unit operation... means a unit operation operated in a batch mode. Block means the time period that comprises a single batch cycle. Combustion device burner means a device designed to mix and ignite fuel and air to provide...
Code of Federal Regulations, 2014 CFR
2014-07-01
... properties may vary with time. For a unit operation operated in a batch mode (i.e., batch unit operation... means a unit operation operated in a batch mode. Block means the time period that comprises a single batch cycle. Combustion device burner means a device designed to mix and ignite fuel and air to provide...
Code of Federal Regulations, 2010 CFR
2010-07-01
... properties may vary with time. For a unit operation operated in a batch mode (i.e., batch unit operation... means a unit operation operated in a batch mode. Block means the time period that comprises a single batch cycle. Combustion device burner means a device designed to mix and ignite fuel and air to provide...
40 CFR 60.2905 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Operator Training... unit can be operated unless a fully trained and qualified OSWI unit operator is accessible, either at... operate the OSWI unit directly or be the direct supervisor of one or more other plant personnel who...
40 CFR 62.14595 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... operate the CISWI unit directly or be the direct supervisor of one or more other plant personnel who operate the unit. If all qualified CISWI unit operators are temporarily not accessible, you must follow the procedures in § 62.14625. (b) Operator training and qualification must be obtained through a State...
40 CFR 62.14595 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... operate the CISWI unit directly or be the direct supervisor of one or more other plant personnel who operate the unit. If all qualified CISWI unit operators are temporarily not accessible, you must follow the procedures in § 62.14625. (b) Operator training and qualification must be obtained through a State...
40 CFR 60.2905 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Operator Training... unit can be operated unless a fully trained and qualified OSWI unit operator is accessible, either at... operate the OSWI unit directly or be the direct supervisor of one or more other plant personnel who...
40 CFR 60.4810 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of... the operator training and qualification requirements? (a) A SSI unit cannot be operated unless a fully... within 1 hour. The trained and qualified SSI unit operator may operate the SSI unit directly or be the...
40 CFR 60.4810 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of... the operator training and qualification requirements? (a) A SSI unit cannot be operated unless a fully... within 1 hour. The trained and qualified SSI unit operator may operate the SSI unit directly or be the...
40 CFR 60.4810 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of... the operator training and qualification requirements? (a) A SSI unit cannot be operated unless a fully... within 1 hour. The trained and qualified SSI unit operator may operate the SSI unit directly or be the...
40 CFR 60.2905 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Operator Training... unit can be operated unless a fully trained and qualified OSWI unit operator is accessible, either at... operate the OSWI unit directly or be the direct supervisor of one or more other plant personnel who...
Code of Federal Regulations, 2014 CFR
2014-07-01
... certification, who may operate the municipal waste combustion unit? 62.15135 Section 62.15135 Protection of... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operator Certification... combustion unit? After the required date for full or provisional certification, you must not operate your...
Code of Federal Regulations, 2012 CFR
2012-07-01
... certification, who may operate the municipal waste combustion unit? 62.15135 Section 62.15135 Protection of... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operator Certification... combustion unit? After the required date for full or provisional certification, you must not operate your...
Code of Federal Regulations, 2013 CFR
2013-07-01
... certification, who may operate the municipal waste combustion unit? 62.15135 Section 62.15135 Protection of... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operator Certification... combustion unit? After the required date for full or provisional certification, you must not operate your...
Code of Federal Regulations, 2011 CFR
2011-07-01
... certification, who may operate the municipal waste combustion unit? 62.15135 Section 62.15135 Protection of... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operator Certification... combustion unit? After the required date for full or provisional certification, you must not operate your...
Code of Federal Regulations, 2010 CFR
2010-07-01
... certification, who may operate the municipal waste combustion unit? 62.15135 Section 62.15135 Protection of... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operator Certification... combustion unit? After the required date for full or provisional certification, you must not operate your...
Spine-area pain in military personnel: a review of epidemiology, etiology, diagnosis, and treatment.
Cohen, Steven P; Gallagher, Rollin M; Davis, Shelton A; Griffith, Scott R; Carragee, Eugene J
2012-09-01
Nonbattle illnesses and injuries are the major causes of unit attrition in modern warfare. Spine-area pain is a common disabling injury in service members associated with a very low return-to-duty (RTD) rate. To provide an overview of the current understanding of epidemiology, possible causes, and relative prognosis of spine-area pain syndromes in military personnel, including a discussion of various treatment options available in theaters of operation. Literature review. Search focusing on epidemiology, etiology and associative factors, and treatment of spinal pain using electronic databases, textbooks, bibliographic references, and personal accounts. Spine-area pain is the most common injury or complaint "in garrison" and appears to increase during training and combat deployments. Approximately three-quarters involve low back pain, followed by cervical and midback pain syndromes. Some predictive factors associated with spine-area pain are similar to those observed in civilian cohorts, such as psychosocial distress, heavy physical activity, and more sedentary lifestyle. Risk factors specific to military personnel include concomitant psychological trauma, g-force exposure in pilots and airmen, extreme shock and vibration exposure, heavy combat load requirements, and falls incurred during airborne, air assault, and urban dismounted ground operations. Effective forward-deployed treatment has been difficult to implement, but newer strategies may improve RTD rates. Spine-area pain syndromes comprise a major source of unit attrition and are often the result of duty-related burdens incurred during combat operations. Current strategies in theaters of operation that may improve the low RTD rates include individual and unit level psychological support, early resumption of at least some forward-area duties, multimodal treatments, and ergonomic modifications. Published by Elsevier Inc.
Study on safety operation for large hydroelectric generator unit
NASA Astrophysics Data System (ADS)
Yan, Z. G.; Cui, T.; Zhou, L. J.; Zhi, F. L.; Wang, Z. W.
2012-11-01
Hydroelectric generator unit is a complex mechanical system which is composed of hydraulic turbine and electric generator. Rotary system is supported by the bearing bracket and the reinforced concrete structures, and vibration problem can't be avoided in the process of operating. Many large-scale hydroelectric units have been damaged because of the vibration problem in recent years. As the increase of the hydraulic turbine unit capacity and water head, the safe operation of hydraulic turbine has become a focus research in many countries. The operating characteristics of the hydraulic turbine have obvious differences at different working conditions. Based on the combination of field measurement and theoretical calculation, this paper shows a deep research on the safe operation of a large-scale Francis turbine unit. Firstly, the measurements of vibration, swing, pressure fluctuation and noise were carried out at 4 different heads. And also the relationships between vibrations and pressure fluctuations at different heads and working conditions were analysed deeply. Then the scientific prediction of safe operation for the unit at high head were done based on the CFD numerical calculation. Finally, this paper shows the division of the operating zone for the hydroelectric unit. According to the experimental results (vibrations, swings, pressure fluctuations and noise) as well as the theoretical results, the operating zone of the unit has been divided into three sections: prohibited operating zone, transition operating zone and safe operating zone. After this research was applied in the hydropower station, the security and economic efficiency of unit increased greatly, and enormous economic benefits and social benefits have been obtained.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Nakafuji, Dora; Gouveia, Lauren
This project supports development of the next generation, integrated energy management infrastructure (EMS) able to incorporate advance visualization of behind-the-meter distributed resource information and probabilistic renewable energy generation forecasts to inform real-time operational decisions. The project involves end-users and active feedback from an Utility Advisory Team (UAT) to help inform how information can be used to enhance operational functions (e.g. unit commitment, load forecasting, Automatic Generation Control (AGC) reserve monitoring, ramp alerts) within two major EMS platforms. Objectives include: Engaging utility operations personnel to develop user input on displays, set expectations, test and review; Developing ease of use and timelinessmore » metrics for measuring enhancements; Developing prototype integrated capabilities within two operational EMS environments; Demonstrating an integrated decision analysis platform with real-time wind and solar forecasting information and timely distributed resource information; Seamlessly integrating new 4-dimensional information into operations without increasing workload and complexities; Developing sufficient analytics to inform and confidently transform and adopt new operating practices and procedures; Disseminating project lessons learned through industry sponsored workshops and conferences;Building on collaborative utility-vendor partnership and industry capabilities« less
Environmental Engineering Unit Operations and Unit Processes Laboratory Manual.
ERIC Educational Resources Information Center
O'Connor, John T., Ed.
This manual was prepared for the purpose of stimulating the development of effective unit operations and unit processes laboratory courses in environmental engineering. Laboratory activities emphasizing physical operations, biological, and chemical processes are designed for various educational and equipment levels. An introductory section reviews…
Chatterjee, Abhishek; Holubar, Stefan D; Figy, Sean; Chen, Lilian; Montagne, Shirley A; Rosen, Joseph M; Desimone, Joseph P
2012-06-01
The relative value unit system relies on subjective measures of physician input in the care of patients. A payment per unit time model incorporates surgeon reimbursement to the total care time spent in the operating room, postoperative in-house, and clinic time to define payment per unit time. We aimed to compare common general surgery operations by using the total care time and payment per unit time method in order to demonstrate a more objective measurement for physician reimbursement. Average total physician payment per case was obtained for 5 outpatient operations and 4 inpatient operations in general surgery. Total care time was defined as the sum of operative time, 30 minutes per hospital day, and 30 minutes per office visit for each operation. Payment per unit time was calculated by dividing the physician reimbursement per case by the total care time. Total care time, physician payment per case, and payment per unit time for each type of operation demonstrated that an average payment per time spent for inpatient operations was $455.73 and slightly more at $467.51 for outpatient operations. Partial colectomy with primary anastomosis had the longest total care time (8.98 hours) and the least payment per unit time ($188.52). Laparoscopic gastric bypass had the highest payment per time ($707.30). The total care time and payment per unit time method can be used as an adjunct to compare reimbursement among different operations on an institutional level as well as on a national level. Although many operations have similar payment trends based on time spent by the surgeon, payment differences using this methodology are seen and may be in need of further review. Copyright © 2012 American College of Surgeons. Published by Elsevier Inc. All rights reserved.
NASA Astrophysics Data System (ADS)
Wasko, Frank
Traditionally, electric utilities have been slow to change and very bureaucratic in nature. This culture, in and of itself, has now contributed to a high percentage of United States electric utilities operating uneconomical nuclear plants (Crooks, 2014). The economic picture behind owning and operating United States nuclear plants is less than favorable for many reasons including rising fuel, capital and operating costs (EUCG, 2012). This doctoral dissertation is specifically focused on life without nuclear power. The purpose of this dissertation is to create a model and guide that will provide electric utilities who currently operate or will operate uneconomical nuclear plants the opportunity to economically assess whether or not their nuclear plant should be retired. This economic assessment and stakeholder analysis will provide local government, academia and communities the opportunity to understand how Southern California Edison (SCE) embraced system upgrade import and "voltage support" opportunities to replace "base load" generation from San Onofre Nuclear Generating Station (SONGS) versus building new replacement generation facilities. This model and guide will help eliminate the need to build large replacement generation units as demonstrated in the SONGS case analysis. The application of The Nuclear Power Retirement Model and Guide will provide electric utilities with economic assessment parameters and an evaluation assessment progression needed to better evaluate when an uneconomical nuclear plant should be retired. It will provide electric utilities the opportunity to utilize sound policy, planning and development skill sets when making this difficult decision. There are currently 62 nuclear power plants (with 100 nuclear reactors) operating in the United States (EIA, 2014). From this group, 38 are at risk of early retirement based on the work of Cooper (2013). As demonstrated in my model, 35 of the 38 nuclear power plants qualify to move to the economic assessment review and then on to the stakeholder cost benefit analysis (if model qualifications are met) leading to a final plant retirement decision. This application via the model and guide, in turn, will lead electric utilities to explore system upgrade import opportunities and mitigation measures versus building new replacement generation facilities. United States nuclear reactors are licensed for 40 years with a 20 year extension available prior to the expiration date (EIA, 2013). Since late 2012, electric power companies have announced the early retirement of four uneconomical nuclear power plants while other studies have indicated that as many as 70 percent of United States nuclear power plants are potentially at risk for early retirement (Crooks, 2014 and Cooper, 2013). A high percentage of these aforementioned nuclear plants have operating licenses that will not expire until 2030 and beyond. Thus, for the most part, replacement power contingency planning has not been initiated for these plants or is still in preliminary stages. The recent nuclear plant retirements are the first since 1998 (EIA, 2013). Decisions to retire the plants involved concerns over maintenance and repair costs as well as declining profitability (EIA, 2013). In addition, the Energy Information Administration (2010-2012) released data that demonstrated that the worst 25 percent of United States nuclear plants are far more expensive to operate and generate electricity than new gas plants. It is equally important to understand and explain the economic and power replacement implications to both ratepayers and end-users. A SONGS case study analysis will review the economic, operational and political challenges that SCE faced leading to the retirement decision of SONGS. As preface to the case study, replacement steam generators (RSGs) were installed in Unit 2 in 2009 and in Unit 3 in 2010. In January 2012, while Unit 2 was down for routine maintenance, a small leak was discovered inside a steam generator in Unit 3. Because of the situation, both units remained shut down to evaluate the cause of the leakage and to make repairs. SCE submitted plans to the Nuclear Regulatory Commission (NRC) to re-start Unit 2 at reduced power. However, concerns over the length of the review process and the high costs associated with steam generator repairs led SCE to retire both reactors (SCE SONGS Fact Sheets, 2012-2013). Finally, collaborative resource power replacement planning is needed more than ever as nuclear facilities in the United States are now being retired for economic related reasons (Crooks, 2014). This collaborative power replacement process and implementation must encompass all relevant stakeholders including state grid operators, ratepayers, shareholders and the electric utility company.
[The role of a specialised risk analysis group in the Veterinary Services of a developing country].
Urbina-Amarís, M E
2003-08-01
Since the World Trade Organization (WTO) Agreement on the Application of Sanitary and Phytosanitary Measures was established, risk analysis in trade, and ultimately in Veterinary and Animal Health Services, has become strategically important. Irrespective of their concept (discipline, approach, method, process), all types of risk analysis in trade involve four periods or phases:--risk identification-- risk assessment--risk management--risk information or communication. All veterinarians involved in a risk analysis unit must have in-depth knowledge of statistics and the epidemiology of transmissible diseases, as well as a basic knowledge of veterinary science, economics, mathematics, data processing and social communication, to enable them to work with professionals in these disciplines. Many developing countries do not have enough well-qualified professionnals in these areas to support a risk analysis unit. This will need to be rectified by seeking strategic alliances with other public or private sectors that will provide the required support to run the unit properly. Due to the special nature of its risk analysis functions, its role in supporting decision-making, and the criteria of independence and transparency that are so crucial to its operations, the hierarchical position of the risk analysis unit should be close to the top management of the Veterinary Service. Due to the shortage of personnel in developing countries with the required training and scientific and technical qualifications, countries with organisations responsible for both animal and plant health protection would be advised to set up integrated plant and animal risk analysis units. In addition, these units could take charge of all activities relating to WTO agreements and regional agreements on animal and plant health management.
ERIC Educational Resources Information Center
Tapia, Cristian; Muller, Mauricio; Sapag-Hagar, Jaime; Valenzuela, Fernando; Basualto, Carlos; Abugoch, Lilian
2005-01-01
The Unit Operations Laboratory offers 2 courses in unit operations. One is a 2-semester course for chemistry and food engineering students that is more demanding because it considers more unit operations and places more emphasis on solving exercises. The other is a 1-semester course for chemistry and pharmacy students that considers fewer unit…
Excessive quantities of red blood cells are issued to the operating room.
Collins, R A; Wisniewski, M K; Waters, J H; Triulzi, D J; Alarcon, L H; Yazer, M H
2015-12-01
To determine what percentage of red blood cell (RBC) units that were issued to the operating room (OR) were returned unused, and to determine how often all of the RBCs that were issued for a patient were returned unused using the institution's maximum surgical blood ordering schedule (MSBOS) as a guide. The MSBOS provides guidelines for blood ordering, but is merely a suggestion for the ordering clinicians. This study examined how closely ordering practices followed the MSBOS, and how often ordered RBCs were actually transfused. For a 4-week period, RBC issue and utilization data were collected on elective surgery patients who were eligible for electronic cross-match at a tertiary care hospital. These data were compared to the MSBOS. There were 1350 surgical procedures performed. Of these cases, 439 patients had a type and screen (T&S) performed, and 215/439 (49%) patients had at least 1 RBC issued during their case. To these 215 patients, 742 RBC units were issued and 537/742 (72%) of these units were returned to the blood bank unused. In 152/215 (71%) cases with issued RBCs, all of the RBCs were returned to the blood bank unused. Amongst the surgical categories in this study, the percentage of cases where none of the issued RBCs were transfused ranged from 38 to 93%. Significant numbers of RBC units are issued but not transfused during surgery. Involving the surgical team in the blood issuing process and using a data-driven MSBOS may reduce the number of unused units. © 2015 British Blood Transfusion Society.
40 CFR 63.100 - Applicability and designation of source.
Code of Federal Regulations, 2010 CFR
2010-07-01
... manufacturing process unit has two or more products that have the same maximum annual design capacity on a mass... subject to this subpart. (3) For chemical manufacturing process units that are designed and operated as... chemical manufacturing process units that are designed and operated as flexible operation units shall be...
2010-12-01
An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management ______________________________________ By...Report 4. TITLE AND SUBTITLE: An Analysis of United States Marine Corps Enlisted Entry-Level Training Using Supply Chain and Operations Management 6...Level Training; United States Marine Corps; Operations Management ; Supply Chain Management; Process Analysis 16. PRICE CODE 17. SECURITY
Remote Sensing Laboratory - RSL
None
2018-01-16
One of the primary resources supporting homeland security is the Remote Sensing Laboratory, or RSL. The Laboratory creates advanced technologies for emergency response operations, radiological incident response, and other remote sensing activities. RSL emergency response teams are on call 24-hours a day, and maintain the capability to deploy domestically and internationally in response to threats involving the loss, theft, or release of nuclear or radioactive material. Such incidents might include Nuclear Power Plant accidents, terrorist incidents involving nuclear or radiological materials, NASA launches, and transportation accidents involving nuclear materials. Working with the US Department of Homeland Security, RSL personnel equip, maintain, and conduct training on the mobile detection deployment unit, to provide nuclear radiological security at major national events such as the super bowl, the Indianapolis 500, New Year's Eve celebrations, presidential inaugurations, international meetings and conferences, just about any event where large numbers of people will gather.
Remote Sensing Laboratory - RSL
DOE Office of Scientific and Technical Information (OSTI.GOV)
None
2014-11-06
One of the primary resources supporting homeland security is the Remote Sensing Laboratory, or RSL. The Laboratory creates advanced technologies for emergency response operations, radiological incident response, and other remote sensing activities. RSL emergency response teams are on call 24-hours a day, and maintain the capability to deploy domestically and internationally in response to threats involving the loss, theft, or release of nuclear or radioactive material. Such incidents might include Nuclear Power Plant accidents, terrorist incidents involving nuclear or radiological materials, NASA launches, and transportation accidents involving nuclear materials. Working with the US Department of Homeland Security, RSL personnel equip,more » maintain, and conduct training on the mobile detection deployment unit, to provide nuclear radiological security at major national events such as the super bowl, the Indianapolis 500, New Year's Eve celebrations, presidential inaugurations, international meetings and conferences, just about any event where large numbers of people will gather.« less
The causes and control of loader- and truck-related fatalities in surface mining operations.
Kecojevic, Vladislav; Radomsky, Mark
2004-12-01
At surface mining operations throughout the world, loaders and trucks are a primary means of material loading and haulage. As the size, use and technological complexity of these units have increased, so has the concern regarding loader and truck safety. The severity and number of accidents involving loaders and trucks is higher when compared to all other mining accident types. In this paper, an analysis of loader and truck-related fatalities over the last 8 years is performed, the fatality categories and causes of accidents are established and control strategies are discussed and evaluated in an effort to increase hazard awareness by emphasizing safe loading, hauling and maintenance practices, as well as the value of traditional and innovative miner training programmes.
NASA Astrophysics Data System (ADS)
Kelly, A.; Watson, W.
2014-09-01
This paper describes one of the challenges facing the flight operations teams of the International Earth Observing constellation satellites at the 705 km orbit, including NASAs satellites. The NASA Earth Science Mission Operations (ESMO) Project has been dealing with predicted conjunctions (close approach) between operational/non-operational space objects and the satellites in the International Earth observing constellations for several years. Constellation satellites include: NASAs Earth Observing System (EOS) Terra, Aqua, and Aura, CloudSat, the joint NASA/CNES CALIPSO mission, Earth Observing 1 (EO-1), the Japan Aerospace and Exploration Agency (JAXA) Global Change Observation Mission-Water 1 (GCOM-W1) mission, the United States Geological Survey (USGS) Landsat 7 and Landsat 8, and until 2013, Argentinas SAC-C mission and the CNES PARASOL mission. The NASA Conjunction Analysis and Risk Assessment (CARA) team provides daily reports to the ESMO Project regarding any high interest close approach events (HIEs) involving the constellation satellites. The daily CARA reports provide risk assessment results that help the operations teams to determine if there is a need to perform a risk mitigation action. If the conjuncting space object is an operational satellite that is capable of maneuvering, the affected satellite team needs to coordinate their action plan with the owner operator of the conjuncting satellite. It is absolutely critical for the two teams to communicate as soon as possible. The goal is to minimize the collision risk; this can happen if both satellite operators do not coordinate their maneuver plans. The constellation teams have established guidelines for coordinating HIEs. This coordination process has worked successfully for several years for satellites that are operated by other organizations in the United States and by NASAs international partners, all with whom NASA has a cooperative agreement. However, the situation is different for HIEs with satellites of foreign operators that do not have an agreement with NASA and the constellation organizations. The current process for coordinating close approach events is neither timely nor satisfactory. Due to the concern that NASAs multi-billion dollar assets at the 705 km orbit can be wiped out by a collision with satellites of foreign operators, the NASA ESMO Project and the CARA team are proposing a more timely coordination and communication process to resolve and safely mitigate these HIEs. This proposed process does not violate any existing communication constraints between the United States and certain foreign operators. This proposal, as described in this paper, will be presented at the conference and comments from other satellite operators will be welcomed and greatly appreciated.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-01
... Special Operations Command (USSOCOM) Inventory List of Contracts for Services; Correction AGENCY: United States Special Operations Command (USSOCOM), Department of Defense (DoD). ACTION: Notice of availability... Fiscal Year 2010 United States Special Operations Command (USSOCOM) Inventory List of Contracts for...
40 CFR 60.3014 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2010 CFR
2010-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines... and qualification requirements? (a) No OSWI unit can be operated unless a fully trained and qualified... trained and qualified OSWI unit operator may operate the OSWI unit directly or be the direct supervisor of...
40 CFR 60.3014 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines... and qualification requirements? (a) No OSWI unit can be operated unless a fully trained and qualified... trained and qualified OSWI unit operator may operate the OSWI unit directly or be the direct supervisor of...
40 CFR 60.3014 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines... and qualification requirements? (a) No OSWI unit can be operated unless a fully trained and qualified... trained and qualified OSWI unit operator may operate the OSWI unit directly or be the direct supervisor of...
40 CFR 60.3014 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2012 CFR
2012-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines... and qualification requirements? (a) No OSWI unit can be operated unless a fully trained and qualified... trained and qualified OSWI unit operator may operate the OSWI unit directly or be the direct supervisor of...
40 CFR 60.3014 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2011 CFR
2011-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines... and qualification requirements? (a) No OSWI unit can be operated unless a fully trained and qualified... trained and qualified OSWI unit operator may operate the OSWI unit directly or be the direct supervisor of...
27 CFR 24.147 - Operations bond or unit bond.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 27 Alcohol, Tobacco Products and Firearms 1 2010-04-01 2010-04-01 false Operations bond or unit... BUREAU, DEPARTMENT OF THE TREASURY LIQUORS WINE Establishment and Operations Bonds and Consents of Surety § 24.147 Operations bond or unit bond. Notwithstanding the provisions of § 24.146, each person...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-27
... Operations Final Environmental Impact Statement, Wayne N. Aspinall Unit, Colorado River Storage Project... SUMMARY: The Bureau of Reclamation (Reclamation), the Federal agency responsible for operation of the... Aspinall Unit operations, Gunnison and Montrose Counties, Colorado. DATES: Reclamation will not make a...
Cost accounting, management control, and planning in health care.
Siegrist, R B; Blish, C S
1988-02-01
Advantages and pharmacy applications of computerized hospital management-control and planning systems are described. Hospitals must define their product lines; patient cases, not tests or procedures, are the end product. Management involves operational control, management control, and strategic planning. Operational control deals with day-to-day management on the task level. Management control involves ensuring that managers use resources effectively and efficiently to accomplish the organization's objectives. Management control includes both control of unit costs of intermediate products, which are procedures and services used to treat patients and are managed by hospital department heads, and control of intermediate product use per case (managed by the clinician). Information from the operation and management levels feeds into the strategic plan; conversely, the management level controls the plan and the operational level carries it out. In the system developed at New England Medical Center, Boston, Massachusetts, the intermediate product-management system enables managers to identify intermediate products, develop standard costs, simulate changes in departmental costs, and perform variance analysis. The end-product management system creates a patient-level data-base, identifies end products (patient-care groupings), develops standard resource protocols, models alternative assumptions, performs variance analysis, and provides concurrent reporting. Examples are given of pharmacy managers' use of such systems to answer questions in the areas of product costing, product pricing, variance analysis, productivity monitoring, flexible budgeting, modeling and planning, and comparative analysis.(ABSTRACT TRUNCATED AT 250 WORDS)
Evaluation of a policy to reduce youth tractor crashes on public roads.
Marlenga, B; Doty, B C; Berg, R L; Linneman, J G
2006-02-01
Evaluate the effectiveness of a United States state law, Wisconsin Act 455, in reducing highway tractor crashes involving youth operators. Policy outcome evaluation involving review of a retrospective case series. Youth highway tractor crashes from Wisconsin for the years 1994-2003 that resulted in a fatality, injury, and/or property damage. One hundred and forty six tractor crash cases involving operators younger than 16 years. Describe and model the tractor crash patterns before and after enactment of the law, and examine the relation between the contributing circumstances identified in the crash reports and the content covered in the mandated tractor certification course. There was neither a significant change in the number of youth tractor crashes after the law was passed, nor any reduction in the proportion of crashes where the youth operator was designated at fault. The tractor certification course did not cover the major factors contributing to youth tractor crashes on public roads. No significant effect of the law was detected and crash rates at the end of the study period were similar to those before Wisconsin Act 455. The authors'findings should not be construed to suggest that public policy, in general, is an ineffective strategy for the prevention of pediatric agricultural injuries. Negotiating a balance in public policy debates will be a challenge, but it is clear that future policy initiatives need to identify and implement the right policy for the right problem.
Weight Control Intervention for Truck Drivers: The SHIFT Randomized Controlled Trial, United States
Wipfli, Brad; Thompson, Sharon V.; Elliot, Diane L.; Anger, W. Kent; Bodner, Todd; Hammer, Leslie B.; Perrin, Nancy A.
2016-01-01
Objectives. To evaluate the effectiveness of the Safety and Health Involvement For Truckers (SHIFT) intervention with a randomized controlled design. Methods. The multicomponent intervention was a weight-loss competition supported with body weight and behavioral self-monitoring, computer-based training, and motivational interviewing. We evaluated intervention effectiveness with a cluster-randomized design involving 22 terminals from 5 companies in the United States in 2012 to 2014. Companies were required to provide interstate transportation services and operate at least 2 larger terminals. We randomly assigned terminals to intervention or usual practice control conditions. We assessed participating drivers (n = 452) at baseline and 6 months. Results. In an intent-to-treat analysis, the postintervention difference between groups in mean body mass index change was 1.00 kilograms per meters squared (P < .001; intervention = −0.73; control = +0.27). Behavioral changes included statistically significant improvements in fruit and vegetable consumption and physical activity. Conclusions. Results establish the effectiveness of a multicomponent and remotely administered intervention for producing significant weight loss among commercial truck drivers. PMID:27463067
Weight Control Intervention for Truck Drivers: The SHIFT Randomized Controlled Trial, United States.
Olson, Ryan; Wipfli, Brad; Thompson, Sharon V; Elliot, Diane L; Anger, W Kent; Bodner, Todd; Hammer, Leslie B; Perrin, Nancy A
2016-09-01
To evaluate the effectiveness of the Safety and Health Involvement For Truckers (SHIFT) intervention with a randomized controlled design. The multicomponent intervention was a weight-loss competition supported with body weight and behavioral self-monitoring, computer-based training, and motivational interviewing. We evaluated intervention effectiveness with a cluster-randomized design involving 22 terminals from 5 companies in the United States in 2012 to 2014. Companies were required to provide interstate transportation services and operate at least 2 larger terminals. We randomly assigned terminals to intervention or usual practice control conditions. We assessed participating drivers (n = 452) at baseline and 6 months. In an intent-to-treat analysis, the postintervention difference between groups in mean body mass index change was 1.00 kilograms per meters squared (P < .001; intervention = -0.73; control = +0.27). Behavioral changes included statistically significant improvements in fruit and vegetable consumption and physical activity. Results establish the effectiveness of a multicomponent and remotely administered intervention for producing significant weight loss among commercial truck drivers.
McIntosh, Freda M; Maison, Nathalie; Holtrop, Grietje; Young, Pauline; Stevens, Valerie J; Ince, Jennifer; Johnstone, Alexandra M; Lobley, Gerald E; Flint, Harry J; Louis, Petra
2012-08-01
Bacterial β-glucuronidase in the human colon plays an important role in cleaving liver conjugates of dietary compounds and xenobiotics, while other glycosidase activities are involved in the conversion of dietary plant glycosides. Here we detected an increase in β-glucuronidase activity in faecal samples from obese volunteers following a high-protein moderate carbohydrate weight-loss diet, compared with a weight maintenance diet, but little or no changes were observed when the type of fermentable carbohydrate was varied. Other faecal glycosidase activities showed little or no change over a fivefold range of dietary NSP intake, although α-glucosidase increased on a resistant starch-enriched diet. Two distinct groups of gene, gus and BG, have been reported to encode β-glucuronidase activity among human colonic bacteria. Degenerate primers were designed against these genes. Overall, Firmicutes were found to account for 96% of amplified gus sequences, with three operational taxonomic units particularly abundant, whereas 59% of amplified BG sequences belonged to Bacteroidetes and 41% to Firmicutes. A similar distribution of operational taxonomic units was found in a published metagenome dataset involving a larger number of volunteers. Seven cultured isolates of human colonic bacteria that carried only the BG gene gave relatively low β-glucuronidase activity that was not induced by 4-nitrophenyl-β-D-glucuronide. By comparison, in three of five isolates that possessed only the gus gene, β-glucuronidase activity was induced. © 2012 Society for Applied Microbiology and Blackwell Publishing Ltd.
Investigation of alternate power source for Space Shuttle Orbiter hydraulic system
NASA Technical Reports Server (NTRS)
Simon, William E.; Young, Fred M.
1993-01-01
This investigation consists of a short-term feasibility study to determine whether or not an alternate electrical power source would trade favorably from a performance, reliability, safety, operation, and weight standpoint in replacing the current auxiliary power unit subsystems with its attendant components (water spray boiler, hydrazine fuel and tanks, feed and vent lines, controls, etc.), operating under current flight rules. Results of this feasibility study are used to develop recommendations for the next step (e.g., to determine if such an alternate electrical power source would show an advantage given that the current operational flight mode of the system could be modified in such a way as not to constrain the operational capability and safety of the vehicle). However, this next step is not within the scope of this investigation. This study does not include a cost analysis, nor does it include investigation of the integration aspects involved in such a trade, except in a qualitative sense for the determination of concept feasibility.
2002-03-01
sections consists of four units, the Domestic Terrorism Operations Unit, the WMD Operations Unit, the WMD Countermeasures Unit, and Special Events Management Unit...Countermeasures Unit Chief Special Events Management Unit Chief Domestic Terrorism/ Counterterrorism Section Chief International Terrorism Section Asstistant
NASA Technical Reports Server (NTRS)
Hilton, D. A.; Henderson, H. R.; Maglieri, D. J.
1971-01-01
Noise measurements were obtained for a four-engine turbopropeller STOL airplane during a Federal Aviation Administration flight evaluation program at the National Aviation Facilities Experimental Center. These noise measurements involved landing-approach, takeoff-climbout, and flyby operations of the airplane. A total of 13 measuring positions were used to define the noise characteristics around a simulated STOL port. The results are presented in the form of both physical and subjective measurements. An appendix is included to present tabulated values of various subjective reaction units which may be significant for the planning and operation of STOL ports. The main source of noise produced by this vehicle was found to be the propeller, and noise levels decrease generally in accordance with the inverse-distance law for distances up to about 457 meters. For similar slant ranges, somewhat lower noise levels were experienced during flyby than during takeoff or landing.
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for my municipal waste combustion unit? 62.15145 Section 62.15145 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operating Requirements § 62.15145 What are the operating practice requirements for my municipal waste combustion unit? (a) You...
Code of Federal Regulations, 2011 CFR
2011-07-01
... requirements for my municipal waste combustion unit? 62.15145 Section 62.15145 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operating Requirements § 62.15145 What are the operating practice requirements for my municipal waste combustion unit? (a) You...
Code of Federal Regulations, 2014 CFR
2014-07-01
... requirements for my municipal waste combustion unit? 62.15145 Section 62.15145 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operating Requirements § 62.15145 What are the operating practice requirements for my municipal waste combustion unit? (a) You...
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirements for my municipal waste combustion unit? 62.15145 Section 62.15145 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operating Requirements § 62.15145 What are the operating practice requirements for my municipal waste combustion unit? (a) You...
Code of Federal Regulations, 2013 CFR
2013-07-01
... requirements for my municipal waste combustion unit? 62.15145 Section 62.15145 Protection of Environment... Combustion Units Constructed on or Before August 30, 1999 Good Combustion Practices: Operating Requirements § 62.15145 What are the operating practice requirements for my municipal waste combustion unit? (a) You...
Optimization of steam generators of NPP with WWER in operation with variable load
NASA Astrophysics Data System (ADS)
Parchevskii, V. M.; Shchederkina, T. E.; Gur'yanova, V. V.
2017-11-01
The report addresses the issue of the optimal water level in the horizontal steam generators of NPP with WWER. On the one hand, the level needs to be kept at the lower limit of the allowable range, as gravity separation, steam will have the least humidity and the turbine will operate with higher efficiency. On the other hand, the higher the level, the greater the supply of water in the steam generator, and therefore the higher the security level of the unit, because when accidents involving loss of cooling of the reactor core, the water in the steam generators, can be used for cooling. To quantitatively compare the damage from higher level to the benefit of improving the safety was assessed of the cost of one cubic meter of water in the steam generators, the formulated objective function of optimal levels control. This was used two-dimensional separation characteristics of steam generators. It is demonstrated that the security significantly shifts the optimal values of the levels toward the higher values, and this bias is greater the lower the load unit.
NASA Astrophysics Data System (ADS)
Yuan, Bo; Zong, Jin; Xu, Zhicheng
2018-06-01
According to different operating characteristics of pumped storage fixed speed unit and variable speed unit, a joint dispatching model of pumped storage unit and other types of units based on mixed integer linear optimization is constructed. The model takes into account the operating conditions, reservoir capacity, cycle type and other pumped storage unit constraints, but also consider the frequent start and stop and the stability of the operation of the unit caused by the loss. Using the Cplex solver to solve the model, the empirical example of the provincial power grid shows that the model can effectively arrange the pumping storage speed and the dispatching operation of the variable speed unit under the precondition of economic life of the unit, and give full play to the function of peak shaving and accommodating new energy. Because of its more flexible regulation characteristics of power generation and pumping conditions, the variable speed unit can better improve the operating conditions of other units in the system and promote the new energy dissipation.
Store-operate-coherence-on-value
DOE Office of Scientific and Technical Information (OSTI.GOV)
Chen, Dong; Heidelberger, Philip; Kumar, Sameer
A system, method and computer program product for performing various store-operate instructions in a parallel computing environment that includes a plurality of processors and at least one cache memory device. A queue in the system receives, from a processor, a store-operate instruction that specifies under which condition a cache coherence operation is to be invoked. A hardware unit in the system runs the received store-operate instruction. The hardware unit evaluates whether a result of the running the received store-operate instruction satisfies the condition. The hardware unit invokes a cache coherence operation on a cache memory address associated with the receivedmore » store-operate instruction if the result satisfies the condition. Otherwise, the hardware unit does not invoke the cache coherence operation on the cache memory device.« less
Bartlett, C A; Ghoshal, S
1992-01-01
To compete around the world, a company needs three strategic capabilities: global-scale efficiency, local responsiveness, and the ability to leverage learning worldwide. No single "global" manager can build these capabilities. Rather, groups of specialized managers must integrate assets, resources, and people in diverse operating units. Such managers are made, not born. And how to make them is--and must be--the foremost question for corporate managers. Drawing on their research with leading transnational corporations, Christopher Bartlett and Sumantra Ghoshal identify three types of global managers. They also illustrate the responsibilities each position involves through a close look at the careers of successful executives: Leif Johansson of Electrolux, Howard Gottlieb of NEC, and Wahib Zaki of Procter & Gamble. The first type is the global business or product-division manager who must build worldwide efficiency and competitiveness. These managers recognize cross-border opportunities and risks as well as link activities and capabilities around the world. The second is the country manager whose unit is the building block for worldwide operations. These managers are responsible for understanding and interpreting local markets, building local resources and capabilities, and contributing to--and participating in--the development of global strategy. Finally, there are worldwide functional specialists--the managers whose potential is least appreciated in many traditional multinational companies. To transfer expertise from one unit to another and leverage learning, these managers must scan the company for good ideas and best practice, cross-pollinate among units, and champion innovations with worldwide applications.
Factors impeding flexible inpatient unit design.
Pati, Debajyoti; Evans, Jennie; Harvey, Thomas E; Bazuin, Doug
2012-01-01
To identify and examine factors extraneous to the design decision-making process that could impede the optimization of flexibility on inpatient units. A 2006 empirical study to identify domains of design decisions that affect flexibility on inpatient units found some indication in the context of the acuity-adaptable operational model that factors extraneous to the design process could have negatively influenced the successful implementation of the model. This raised questions regarding extraneous factors that might influence the successful optimization of flexibility. An exploratory, qualitative method was adopted to examine the question. Stakeholders from five recently built acute care inpatient units participated in the study, which involved three types of data collection: (1) verbal protocol data from a gaming session; (2) in-depth semi-structured interviews; and (3) shadowing frontline personnel. Data collection was conducted between June 2009 and November 2010. The study revealed at least nine factors extraneous to the design process that have the potential to hinder the optimization of flexibility in four domains: (1) systemic; (2) cultural; (3) human; and (4) financial. Flexibility is critical to hospital operations in the new healthcare climate, where cost reduction constitutes a vital target. From this perspective, flexibility and efficiency strategies can be influenced by (1) return on investment, (2) communication, (3) culture change, and (4) problem definition. Extraneous factors identified in this study could also affect flexibility in other care settings; therefore, these findings may be viewed from the overall context of hospital design.
40 CFR 60.2905 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of... OSWI unit can be operated unless a fully trained and qualified OSWI unit operator is accessible, either... may operate the OSWI unit directly or be the direct supervisor of one or more other plant personnel...
40 CFR 60.2905 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of... OSWI unit can be operated unless a fully trained and qualified OSWI unit operator is accessible, either... may operate the OSWI unit directly or be the direct supervisor of one or more other plant personnel...
Using a Checklist to Improve Family Communication in Trauma Care.
Dennis, Bradley M; Nolan, Tracy L; Brown, Cecil E; Vogel, Robert L; Flowers, Kristin A; Ashley, Dennis W; Nakayama, Don K
2016-01-01
Modern concepts of patient-centered care emphasize effective communication with patients and families, an essential requirement in acute trauma settings. We hypothesized that using a checklist to guide the initial family conversation would improve the family's perception of the interaction. Institutional Review Board-approved, prospective pre/post study involving families of trauma patients admitted to our Level I trauma center for >24 hours. In the control group, families received information according to existing practices. In the study group, residents gave patient information to a first-degree family member using a checklist that guided the interaction. The checklist included a physician introduction, patient condition, list of known injuries, admission unit or intensive care unit, any consultants involved, plans for additional studies or operations, and opportunity for family to ask questions. An 11-item survey was administered 24 to 48 hours after admission to each group that evaluated the trauma team's communication in the areas of physician introduction, patient condition, ongoing treatment, and family perception of the interaction. Responses were on a Likert scale and analyzed using the Wilcoxon-Mann-Whitney test. There were 130 patients in each group. The study group had significantly (P < 0.05) better responses in 8 of 11 items surveyed: physician spoke to family, physician introduction, understanding of their relative's injuries, admitting unit, consultants involved, urgent surgical procedures required, ongoing diagnostic studies, and understanding of the treatment plan. In conclusion, using a checklist improves the perception of the initial communication between the trauma team and family members of trauma patients, especially their understanding of the treatment plan.
A Descriptive Analysis of US Prehospital Care Response to Law Enforcement Tactical Incidents.
Aberle, Sara J; Lohse, Christine M; Sztajnkrycer, Matthew D
2015-01-01
Law enforcement tactical incidents involve high-risk operations that exceed the capabilities of regular, uniformed police. Despite the existence of tactical teams for 50 years, little is known about the frequency or nature of emergency medical services (EMS) response to tactical events in the United States. The purpose of this study was to perform a descriptive analysis of tactical events reported to a national EMS database. Descriptive analysis of the 2012 National Emergency Medical Services Information System (NEMSIS) Public Release research data set, containing EMS emergency response data from 41 states. A total of 17,479,328 EMS events were reported, of which 3,953 events were coded as "Activation-Tactical or SWAT Specialty Service/Response Team." The most common level of prehospital care present on scene was basic life support (55.2%). The majority (72.3%) of tactical incident activations involved a single patient; mass casualty incidents occurred in 0.5% of events. The most common EMS response locations were homes (48.4%), streets or highways (37.0%), and public buildings (6.3%). The mean age of treated patients was 44.1 years ± 22.0 years; 3.5% of tactical incident activation patients were aged 8 years or less. Injuries were coded as firearm assault in 14.8% and as chemical exposure in 8.9% of events. Cardiac arrest occurred in 5.1% of patients, with the majority (92.2%) occurring prior to EMS arrival. The primary symptoms reported by EMS personnel were pain (37.4%), change in responsiveness (13.1%), and bleeding (8.1%). Advanced airway procedures occurred in 30 patients. No patients were documented as receiving tourniquets or needle thoracostomy. Approximately 11 EMS responses in support of law enforcement tactical operations occur daily in the United States. The majority occur in homes and involve a single patient. Advanced airway procedures are required in a minority of patients. Cardiac arrest is rare and occurs prior to EMS response in the majority of cases. Better understanding of the nature and location of EMS responses to tactical incidents is required to develop consistent EMS policies in support of law enforcement tactical operations. 2015.
Students' understandings of electrochemistry
NASA Astrophysics Data System (ADS)
O'Grady-Morris, Kathryn
Electrochemistry is considered by students to be a difficult topic in chemistry. This research was a mixed methods study guided by the research question: At the end of a unit of study, what are students' understandings of electrochemistry? The framework of analysis used for the qualitative and quantitative data collected in this study was comprised of three categories: types of knowledge used in problem solving, levels of representation of knowledge in chemistry (macroscopic, symbolic, and particulate), and alternative conceptions. Although individually each of the three categories has been reported in previous studies, the contribution of this study is the inter-relationships among them. Semi-structured, task-based interviews were conducted while students were setting up and operating electrochemical cells in the laboratory, and a two-tiered, multiple-choice diagnostic instrument was designed to identify alternative conceptions that students held at the end of the unit. For familiar problems, those involving routine voltaic cells, students used a working-forwards problem-solving strategy, two or three levels of representation of knowledge during explanations, scored higher on both procedural and conceptual knowledge questions in the diagnostic instrument, and held fewer alternative conceptions related to the operation of these cells. For less familiar problems, those involving non-routine voltaic cells and electrolytic cells, students approached problem-solving with procedural knowledge, used only one level of representation of knowledge when explaining the operation of these cells, scored higher on procedural knowledge than conceptual knowledge questions in the diagnostic instrument, and held a greater number of alternative conceptions. Decision routines that involved memorized formulas and procedures were used to solve both quantitative and qualitative problems and the main source of alternative conceptions in this study was the overgeneralization of theory related to the particulate level of representation of knowledge. The findings from this study may contribute further to our understanding of students' conceptions in electrochemistry. Furthermore, understanding the influence of the three categories in the framework of analysis and their inter-relationships on how students make sense of this field may result in a better understanding of classroom practice that could promote the acquisition of conceptual knowledge --- knowledge that is "rich in relationships".
Code of Federal Regulations, 2013 CFR
2013-07-01
... Existing Sewage Sludge Incineration Units a 4 Table 4 to Subpart MMMM of Part 60 Protection of Environment... SOURCES Emission Guidelines and Compliance Times for Existing Sewage Sludge Incineration Units Pt. 60... Sewage Sludge Incineration Units a For these operating parameters You must establish these operating...
Code of Federal Regulations, 2014 CFR
2014-07-01
... Existing Sewage Sludge Incineration Units a 4 Table 4 to Subpart MMMM of Part 60 Protection of Environment... SOURCES Emission Guidelines and Compliance Times for Existing Sewage Sludge Incineration Units Pt. 60... Sewage Sludge Incineration Units a For these operating parameters You must establish these operating...
Code of Federal Regulations, 2010 CFR
2010-07-01
... incineration unit owners and operators in my State? 60.2989 Section 60.2989 Protection of Environment... SOURCES Emission Guidelines and Compliance Times for Other Solid Waste Incineration Units That Commenced... incineration unit owners and operators in my State? (a) No, this subpart does not directly affect incineration...
The Dangers of Failure Masking in Fault-Tolerant Software: Aspects of a Recent In-Flight Upset Event
NASA Technical Reports Server (NTRS)
Johnson, C. W.; Holloway, C. M.
2007-01-01
On 1 August 2005, a Boeing Company 777-200 aircraft, operating on an international passenger flight from Australia to Malaysia, was involved in a significant upset event while flying on autopilot. The Australian Transport Safety Bureau's investigation into the event discovered that an anomaly existed in the component software hierarchy that allowed inputs from a known faulty accelerometer to be processed by the air data inertial reference unit (ADIRU) and used by the primary flight computer, autopilot and other aircraft systems. This anomaly had existed in original ADIRU software, and had not been detected in the testing and certification process for the unit. This paper describes the software aspects of the incident in detail, and suggests possible implications concerning complex, safety-critical, fault-tolerant software.
LACIE - A look to the future. [Large Area Crop Inventory Experiment
NASA Technical Reports Server (NTRS)
Macdonald, R. B.; Hall, F. G.
1977-01-01
The Large Area Crop Inventory Experiment (LACIE) is a 'proof of concept' project designed to demonstrate the applicability of remote sensing technology to the global monitoring of wheat. This paper discusses the need for more timely and reliable monitoring of food and fiber supplies, reviews the monitoring systems currently utilized by the USDA and United Nations Food and Agriculture Organization in the United States and in foreign countries, and elucidates the fundamentals involved in assessing the impact of variable weather and economic conditions on wheat acreage, yield, and production. The experiment's approach to production monitoring is described briefly, and its status is reviewed as of the conclusion of 2 years of successful operation. Examples of acreage and yield monitoring in the Soviet Union are used to illustrate the experiment's approach.
NASA Technical Reports Server (NTRS)
Krebs, R. P.
1971-01-01
The computer program described in this report calculates the design-point characteristics of a compressed-air generator for use in V/STOL applications such as systems with a tip-turbine-driven lift fan. The program computes the dimensions and mass, as well as the thermodynamic performance of a model air generator configuration which involves a straight through-flow combustor. Physical and thermodynamic characteristics of the air generator components are also given. The program was written in FORTRAN IV language. Provision has been made so that the program will accept input values in either SI units or U.S. customary units. Each air generator design-point calculation requires about 1.5 seconds of 7094 computer time for execution.
Primary Maternity Units in rural and remote Australia: Results of a national survey.
Kruske, Sue; Kildea, Sue; Jenkinson, Bec; Pilcher, Jennifer; Robin, Sarah; Rolfe, Margaret; Kornelsen, Jude; Barclay, Lesley
2016-09-01
Primary Maternity Units (PMUs) offer less expensive and potentially more sustainable maternity care, with comparable or better perinatal outcomes for normal pregnancy and birth than higherlevel units. However, little is known about how these maternity services operate in rural and remote Australia, in regards to location, models of care, service structure, support mechanisms or sustainability. This study aimed to confirm and describe how they operate. a descriptive, cross-sectional study was undertaken, utilising a 35-item survey to explore current provision of maternity care in rural and remote PMUs across Australia. Data were subjected to simple descriptive statistics and thematic analysis for free text answers. Only 17 PMUs were identified in rural and remote areas of Australia. All 17 completed the survey. the PMUs were, on average, 56km or 49minutes from their referral service and provided care to an average of 59 birthing women per year. Periodic closures or downgrading of services was common. Low-risk eligibility criteria were universally used, but with some variability. Medically-led care was the most widely available model of care. In most PMUs midwives worked shift work involving both nursing and midwifery duties, with minimal uptake of recent midwifery workforce innovations. Perceived enablers of, and threats to, sustainability were reported. a small number of PMUs operate in rural Australia, and none in remote areas. Continuing overreliance on local medical support, and under-utilisation of the midwifery workforce constrain the restoration of maternity services to rural and remote Australia. Copyright © 2016 Elsevier Ltd. All rights reserved.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Patton, A.D.; Ayoub, A.K.; Singh, C.
1982-07-01
Existing methods for generating capacity reliability evaluation do not explicitly recognize a number of operating considerations which may have important effects in system reliability performance. Thus, current methods may yield estimates of system reliability which differ appreciably from actual observed reliability. Further, current methods offer no means of accurately studying or evaluating alternatives which may differ in one or more operating considerations. Operating considerations which are considered to be important in generating capacity reliability evaluation include: unit duty cycles as influenced by load cycle shape, reliability performance of other units, unit commitment policy, and operating reserve policy; unit start-up failuresmore » distinct from unit running failures; unit start-up times; and unit outage postponability and the management of postponable outages. A detailed Monte Carlo simulation computer model called GENESIS and two analytical models called OPCON and OPPLAN have been developed which are capable of incorporating the effects of many operating considerations including those noted above. These computer models have been used to study a variety of actual and synthetic systems and are available from EPRI. The new models are shown to produce system reliability indices which differ appreciably from index values computed using traditional models which do not recognize operating considerations.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cherkas, Dmytro
2011-10-01
As a result of the nuclear accident at the Chernobyl NPP in 1986, the explosion dispeesed nuclear materials contained in the nuclear fuel of the reactor core over the destroyed facilities at Unit No. 4 and over the territory immediately adjacent to the destroyed unit. The debris was buried under the Cascade Wall. Nuclear materials at the SHELTER can be characterized as spent nuclear fuel, fresh fuel assemblies (including fuel assemblies with damaged geometry and integrity, and individual fuel elements), core fragments of the Chernobyl NPP Unit No. 4, finely-dispersed fuel (powder/dust), uranium and plutonium compounds in water solutions, andmore » lava-like nuclear fuel-containing masses. The new safe confinement (NSC) is a facility designed to enclose the Chernobyl NPP Unit No. 4 destroyed by the accident. Construction of the NSC involves excavating operations, which are continuously monitored including for the level of radiation. The findings of such monitoring at the SHELTER site will allow us to characterize the recovered radioactive waste. When a process material categorized as high activity waste (HAW) is detected the following HLW management operations should be involved: HLW collection; HLW fragmentation (if appropriate); loading HAW into the primary package KT-0.2; loading the primary package filled with HAW into the transportation cask KTZV-0.2; and storing the cask in temporary storage facilities for high-level solid waste. The CDAS system is a system of 3He tubes for neutron coincidence counting, and is designed to measure the percentage ratio of specific nuclear materials in a 200-liter drum containing nuclear material intermixed with a matrix. The CDAS consists of panels with helium counter tubes and a polyethylene moderator. The panels are configured to allow one to position a waste-containing drum and a drum manipulator. The system operates on the ‘add a source’ basis using a small Cf-252 source to identify irregularities in the matrix during an assay. The platform with the source is placed under the measurement chamber. The platform with the source material is moved under the measurement chamber. The design allows one to move the platform with the source in and out, thus moving the drum. The CDAS system and radioactive waste containers have been built. For each drum filled with waste two individual measurements (passive/active) will be made. This paper briefly describes the work carried out to assess qualitatively and quantitatively the nuclear materials contained in high-level waste at the SHELTER facility. These efforts substantially increased nuclear safety and security at the facility.« less
An evaluation of the critical care assistant role within an acute NHS Trust Critical Care Unit.
McGloin, Sarah; Knowles, Judie
2005-01-01
This study provides an evaluation of a training programme designed for developing six critical care assistants to work alongside registered nurses to care for patients within the critical care environment. The programme was run as a pilot funded from the Department of Health's 'critical care bid'. At 18 months long, the programme incorporated a foundation programme, and National Vocational Qualification (NVQ) level 3 in care and adapted Operating Department Practitioner (ODP) NVQ units. Six critical care assistants successfully completed the programme; however, they all then left the unit to undertake further study for pre-registration nursing qualifications. Upon evaluation, a number of key issues were identified. Clear definition of the critical care assistants's role is essential as are dedicated practice development staff, who focus purely on developing the critical care assistant role. More importantly, however, with such key changes in the staffing structure within critical care units, appropriate change management techniques should be employed, ensuring that all staff contributing to the training and development are fully involved from the start.
31 CFR 560.516 - Payment and United States dollar clearing transactions involving Iran.
Code of Federal Regulations, 2012 CFR
2012-07-01
... clearing transactions involving Iran. 560.516 Section 560.516 Money and Finance: Treasury Regulations... Payment and United States dollar clearing transactions involving Iran. (a) United States depository institutions are authorized to process transfers of funds to or from Iran, or for the direct or indirect...
31 CFR 560.516 - Payment and United States dollar clearing transactions involving Iran.
Code of Federal Regulations, 2010 CFR
2010-07-01
... clearing transactions involving Iran. 560.516 Section 560.516 Money and Finance: Treasury Regulations... Payment and United States dollar clearing transactions involving Iran. (a) United States depository institutions are authorized to process transfers of funds to or from Iran, or for the direct or indirect...
31 CFR 560.516 - Payment and United States dollar clearing transactions involving Iran.
Code of Federal Regulations, 2011 CFR
2011-07-01
... clearing transactions involving Iran. 560.516 Section 560.516 Money and Finance: Treasury Regulations... Payment and United States dollar clearing transactions involving Iran. (a) United States depository institutions are authorized to process transfers of funds to or from Iran, or for the direct or indirect...
M.E.366-J embodiment design project: Portable foot restraint
NASA Technical Reports Server (NTRS)
Heaton, Randall; Meyer, Eikar; Schmidt, Davey; Enders, Kevin
1994-01-01
During space shuttle operations, astronauts require support to carry out tasks in the weightless environment. In the past, portable foot restraints (PFR) with orientations adjustable in pitch, roll, and yaw provided this support for payload bay operations. These foot restraints, however, were designed for specific tasks with a load limit of 111.2 Newtons. Since the original design, new applications for foot restraints have been identified. New designs for the foot restraints have been created to boost the operational work load to 444.8 Newtons and decrease setup times. What remains to be designed is an interface between the restraint system and the extravehicular mobility unit (EMU) boots. NASA provided a proposed locking device involving a spring-loaded mechanism. This locking mechanism must withstand loads of 1334.4 Newtons in any direction and weigh less than 222.4 Newtons. This paper develops an embodiment design for the interface between the PFR and the EMU boots. This involves design of the locking mechanism and a removable cleat that allows the boot to interface with this mechanism. The design team used the Paul Beitz engineering methodology to present the systematic development, structural analysis, and production considerations of the embodiment design. This methodology provides a basis for understanding the justification behind the decisions made in the design.
A 20 Year Lifecycle Study for Launch Facilities at the Kennedy Space Center
NASA Technical Reports Server (NTRS)
Kolody, Mark R.; Li. Wenyan; Hintze, Paul E.; Calle, Luz-Marina
2009-01-01
The lifecycle cost analysis was based on corrosion costs for the Kennedy Space Center's Launch Complexes and Mobile Launch Platforms. The first step in the study involved identifying the relevant assets that would be included. Secondly, the identification and collection of the corrosion control cost data for the selected assets was completed. Corrosion control costs were separated into four categories. The sources of cost included the NASA labor for civil servant personnel directly involved in overseeing and managing corrosion control of the assets, United Space Alliance (USA) contractual requirements for performing planned corrosion control tasks, USA performance of unplanned corrosion control tasks, and Testing and Development. Corrosion control operations performed under USA contractual requirements were the most significant contributors to the total cost of corrosion. The operations include the inspection of the pad, routine maintenance of the pad, medium and large scale blasting and repainting activities, and the repair and replacement of structural metal elements. Cost data was collected from the years between 2001 and 2007. These costs were then extrapolated to future years to calculate the 20 year lifecycle costs.
Minimally invasive paediatric cardiac surgery.
Bacha, Emile; Kalfa, David
2014-01-01
The concept of minimally invasive surgery for congenital heart disease in paediatric patients is broad, and has the aim of reducing the trauma of the operation at each stage of management. Firstly, in the operating room using minimally invasive incisions, video-assisted thoracoscopic and robotically assisted surgery, hybrid procedures, image-guided intracardiac surgery, and minimally invasive cardiopulmonary bypass strategies. Secondly, in the intensive-care unit with neuroprotection and 'fast-tracking' strategies that involve early extubation, early hospital discharge, and less exposure to transfused blood products. Thirdly, during postoperative mid-term and long-term follow-up by providing the children and their families with adequate support after hospital discharge. Improvement of these strategies relies on the development of new devices, real-time multimodality imaging, aids to instrument navigation, miniaturized and specialized instrumentation, robotic technology, and computer-assisted modelling of flow dynamics and tissue mechanics. In addition, dedicated multidisciplinary co-ordinated teams involving congenital cardiac surgeons, perfusionists, intensivists, anaesthesiologists, cardiologists, nurses, psychologists, and counsellors are needed before, during, and after surgery to go beyond apparent technological and medical limitations with the goal to 'treat more while hurting less'.
Assessment of Psychophysiological Response and Specific Fine Motor Skills in Combat Units.
Sánchez-Molina, Joaquín; Robles-Pérez, José J; Clemente-Suárez, Vicente J
2018-03-02
Soldiers´ training and experience can influence the outcome of the missions, as well as their own physical integrity. The objective of this research was to analyze the psycho-physiological response and specific motor skills in an urban combat simulation with two units of infantry with different training and experience. psychophysiological parameters -Heart Rate, blood oxygen saturation, glucose and blood lactate, cortical activation, anxiety and heart rate variability-, as well as fine motor skills were analyzed in 31 male soldiers of the Spanish Army, 19 belonging to the Light Infantry Brigade, and 12 to the Heavy Forces Infantry Brigade, before and after an urban combat simulation. A combat simulation provokes an alteration of the psycho-physiological basal state in soldiers and a great unbalance in the sympathetic-vagal interaction. The specific training of Light Infantry unit involves lower metabolic, cardiovascular, and anxiogenic response not only previous, but mainly after a combat maneuver, than Heavy Infantry unit's. No differences were found in relation with fine motor skills, improving in both cases after the maneuver. This fact should be taken into account for betterment units´ deployment preparation in current theaters of operations.
Satellite Power System (SPS) societal assessment
NASA Technical Reports Server (NTRS)
1980-01-01
Construction and operation of a 60-unit (300 GW) domestic SPS over the period 2000 to 2030 would stress many segments of U.S. society. A significant commitment of resources (land, energy, materials) would be required, and a substantial proportion of them would have to be committed prior to the production of any SPS electricity. Forty-four concerns about the SPS were identified via a public outreach experiment involving 9000 individuals from three special interest organizations. The concerns focused on environmental impacts (particularly the effects of microwave radiation) and the centralizing tendency of the SPS on society.
Sustainable Algal Energy Production and Environmental Remediation
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cooke, William E.
2012-07-14
Overall, our results confirm that wild algal species sequester a wide range of organic and metal contaminants and excess nutrients (PAHs, trace metals, and nutrients) from natural waters, and suggest parameters that could be useful in predicting uptake rates for algae growing on an algal floway or other algal growth systems in the environment or in industrial processes. The implication for various fuel production processes differ with the detailed unit operations involved, and these results will be of use in the developing of scaling experiments for various types of engineering process designs.
2016-09-01
an instituted safety program that utilizes a generic risk assessment method involving the 5-M (Mission, Man, Machine , Medium and Management) factor...the Safety core value is hinged upon three key principles—(1) each soldier has a crucial part to play, by adopting safety as a core value and making...it a way of life in his unit; (2) safety is an integral part of training, operations and mission success, and (3) safety is an individual, team and
Sivakumar, Venkatasubramanian; Swaminathan, Gopalaraman; Rao, Paruchuri Gangadhar; Muralidharan, Chellappa; Mandal, Asit Baran; Ramasami, Thirumalachari
2010-08-01
Influence of ultrasound (US) on various unit operations in leather processing has been studied with the aim to improve the process efficiency, quality, reduce process time and achieve near-zero discharge levels in effluent streams as a cleaner option. Effect of US on substrate (skin/leather) matrix as well as substances used in different unit operations have been studied and found to be useful in the processing. Absorption of US energy by leather in process vessel at different distances from US source has been measured and found to be significant. Effect of particle-size of different substances due to sonication indicates positive influence on the diffusion through the matrix. Our experimental results suggest that US effect is better realized for the cases with pronounced diffusion hindrance. Influence of US on bioprocessing of leather has been studied and found beneficial. Attempts have also been made to improve the US aided processing using external aids. Operating US in pulse mode operation could be useful in order to reduce the electrical energy consumption. Use of US has also been studied in the preparation of leather auxiliaries involving mass-transfer resistance. Preliminary cost analysis carried out for ultrasound-assisted leather-dyeing process indicates scale-up possibility. Therefore, US application provide improvement in process efficiency as well as making cleaner production methods feasible. Hence, overall results suggest that use of US in leather industry is imminent and potential viable option in near future. Copyright 2009 Elsevier B.V. All rights reserved.
Ferreri, Matthew; Slagley, Jeremy; Felker, Daniel
2015-01-01
This study compared four treatment protocols to reduce airborne composite fiber particulates during simulated aircraft crash recovery operations. Four different treatments were applied to determine effectiveness in reducing airborne composite fiber particulates as compared to a "no treatment" protocol. Both "gold standard" gravimetric methods and real-time instruments were used to describe mass per volume concentration, particle size distribution, and surface area. The treatment protocols were applying water, wetted water, wax, or aqueous film-forming foam (AFFF) to both burnt and intact tickets of aircraft composite skin panels. The tickets were then cut using a small high-speed rotary tool to simulate crash recovery operations. Aerosol test chamber. None. Airborne particulate control treatments. Measures included concentration units of milligrams per cubic meter of air, particle size distribution as described by both count median diameter and mass median diameter and geometric standard deviation of particles in micrometers, and surface area concentration in units of square micrometers per cubic centimeter. Finally, a Monte Carlo simulation was run on the particle size distribution results. Comparison was made via one-way analysis of variance. A significant difference (p < 0.0001) in idealized particle size distribution was found between the water and wetted water treatments as compared to the other treatments for burnt tickets. Emergency crash recovery operations should include a treatment of the debris with water or wetted water. The resulting increase in particle size will make respiratory protection more effective in protecting the response crews.
Ferreri, Matthew; Slagley, Jeremy; Felker, Daniel
2015-01-01
This study compared four treatment protocols to reduce airborne composite fiber particulates during simulated aircraft crash recovery operations. Four different treatments were applied to determine effectiveness in reducing airborne composite fiber particulates as compared to a "no treatment" protocol. Both "gold standard" gravimetric methods and real-time instruments were used to describe mass per volume concentration, particle size distribution, and surface area. The treatment protocols were applying water, wetted water, wax, or aqueous film-forming foam (AFFF) to both burnt and intact tickets of aircraft composite skin panels. The tickets were then cut using a small high-speed rotary tool to simulate crash recovery operations. Aerosol test chamber. None. Airborne particulate control treatments. Measures included concentration units of milligrams per cubic meter of air, particle size distribution as described by both count median diameter and mass median diameter and geometric standard deviation of particles in micrometers, and surface area concentration in units of square micrometers per cubic centimeter. Finally, a Monte Carlo simulation was run on the particle size distribution results. Comparison was made via one-way analysis of variance. A significant difference (p<0.0001) in idealized particle size distribution was found between the water and wetted water treatments as compared to the other treatments for burnt tickets. Emergency crash recovery operations should include a treatment of the debris with water or wetted water. The resulting increase in particle size will make respiratory protection more effective in protecting the response crews.
McGiff, Thomas J; Danforth, Robert A; Herschaft, Edward E
2012-08-01
Clinical experience indicates that newly available portable hand-held x-ray units provide advantages compared to traditional fixed properly installed and operated x-ray units in dental radiography. However, concern that hand-held x-ray units produce higher operator doses than fixed x-ray units has caused regulatory agencies to mandate requirements for use of hand-held units that go beyond those recommended by the manufacturer and can discourage the use of this technology. To assess the need for additional requirements, a hand-held x-ray unit and a pair of manikins were used to measure the dose to a simulated operator under two conditions: exposures made according to the manufacturer's recommendations and exposures made according to manufacturer's recommendation except for the removal of the x-ray unit's protective backscatter shield. Dose to the simulated operator was determined using an array of personal dosimeters and a pair of pressurized ion chambers. The results indicate that the dose to an operator of this equipment will be less than 0.6 mSv y⁻¹ if the device is used according to the manufacturer's recommendations. This suggests that doses to properly trained operators of well-designed, hand-held dental x-ray units will be below 1.0 mSv y⁻¹ (2% of the annual occupational dose limit) even if additional no additional operational requirements are established by regulatory agencies. This level of annual dose is similar to those reported as typical dental personnel using fixed x-ray units and appears to satisfy the ALARA principal for this class of occupational exposures.
DOE Office of Scientific and Technical Information (OSTI.GOV)
G. B. Mitchem
2001-08-22
This annual progress and performance evaluation report discusses the groundwater remedial actions in the 100 Area, including the interim actions at the 100-HR-3 and 100-KR-4 Operable Units, and also discusses the expedited response action in the 100-NR-2 operable unit.
Reactor engineering support of operations at the Davis-Besse nuclear power station
DOE Office of Scientific and Technical Information (OSTI.GOV)
Kelley, D.B.
1995-12-31
Reactor engineering functions differ greatly from unit to unit; however, direct support of the reactor operators during reactor startups and operational transients is common to all units. This paper summarizes the support the reactor engineers provide the reactor operators during reactor startups and power changes through the use of automated computer programs at the Davis-Besse nuclear power station.
40 CFR 63.1281 - Control equipment requirements.
Code of Federal Regulations, 2013 CFR
2013-07-01
... requirements for sources except small glycol dehydration units. Owners and operators of small glycol dehydration units shall comply with the control requirements in paragraph (f) of this section. (1) The control... or operator shall determine glycol dehydration unit baseline operations (as defined in § 63.1271...
40 CFR 63.1281 - Control equipment requirements.
Code of Federal Regulations, 2014 CFR
2014-07-01
... requirements for sources except small glycol dehydration units. Owners and operators of small glycol dehydration units shall comply with the control requirements in paragraph (f) of this section. (1) The control... or operator shall determine glycol dehydration unit baseline operations (as defined in § 63.1271...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fischer, J
2004-03-15
This report summarizes the investigation of two active desiccant module (ADM) pilot site installations initiated in 2001. Both pilot installations were retrofits at existing facilities served by conventional heating, ventilating, and air-conditioning (HVAC) systems that had encountered frequent humidity control, indoor air quality (IAQ), and other operational problems. Each installation involved combining a SEMCO, Inc., ADM (as described in Fischer and Sand 2002) with a standard packaged rooftop unit built by the Trane Company. A direct digital control (DDC) system integral to the ADM performed the dual function of controlling the ADM/rooftop combination and facilitating data collection, trending, and remotemore » performance monitoring. The first installation involved providing preconditioned outdoor air to replace air exhausted from the large kitchen hood and bathrooms of a Hooters restaurant located in Rome, Georgia. This facility had previously added an additional rooftop unit in an attempt to achieve occupant comfort without success. The second involved conditioning the outdoor air delivered to each room of a wing of the Mountain Creek Inn at the Callaway Gardens resort. This hotel, designed in the ''motor lodge'' format with each room opening to the outdoors, is located in southwest Georgia. Controlling the space humidity always presented a serious challenge. Uncomfortable conditions and musty odors had caused many guests to request to move to other areas within the resort. This is the first field demonstration performed by Oak Ridge National Laboratory where significant energy savings, operating cost savings, and dramatically improved indoor environmental conditions can all be claimed as the results of a retrofit desiccant equipment field installation. The ADM/rooftop combination installed at the restaurant resulted in a reduction of about 34% in the electricity used by the building's air-conditioning system. This represents a reduction of approximately 15% in overall electrical energy consumption and a 12.5-kW reduction in peak demand. The cost of gas used for regeneration of the desiccant wheel over this period of time is estimated to be only $740, using a gas cost of $0.50 per therm--the summer rate in 2001. The estimated net savings is $5400 annually, resulting in a 1-2 year payback. It is likely that similar energy/cost savings were realized at the Callaway Gardens hotel. In this installation, however, a central plant supplied the chilled water serving fan coil units in the hotel wing retrofitted with the ADM, so it was not metered separately. Consequently, the owner could not provide actual energy consumption data specific to the facility. The energy and operating cost savings at both sites are directly attributable to higher cooling-season thermostat settings and decreased conventional system run times. These field installations were selected as an immediate and appropriate response to correct indoor humidity and fresh air ventilation problems being experienced by building occupants and owners, so no rigorous baseline-building vs. test-building energy use/operating cost savings results can be presented. The report presents several simulated comparisons between the ADM/roof HVAC approach and other equipment combinations, where both desiccant and conventional systems are modeled to provide comparable fresh air ventilation rates and indoor humidity levels. The results obtained from these simulations demonstrate convincingly the energy and operating cost savings obtainable with this hybrid desiccant/vapor-compression technology, verifying those actually seen at the pilot installations. The ADM approach is less expensive than conventional alternatives providing similar performance and indoor air quality and provides a very favorable payback (1 year or so) compared with oversized rooftop units that cannot be operated effectively with the necessary high outdoor air percentages.« less
Tagliaferri, Salvatore; Esposito, Francesca Giovanna; Ippolito, Adelaide; Mereghini, Flavia; Magenes, Giovanni; Martinelli, Pasquale; Campanile, Marta; Signorini, Maria Gabriella
2017-03-01
The objective of this article is to provide an overview of the clinical experience of our telemedicine network (TOCOMAT) for fetal well-being assessment through computerized Cardiotocography (cCTG), analyzing cultural, socioeconomic, and environmental conditions of pregnant women and its economic sustainability over time. We used the central data store, including all cCTG records collected in Campania region (Italy) during 17 years of activity. The Operations Center acquires the traces recorded in the Remote Units and simultaneously performs a complex fetal heart rate analysis. An Internet or phone conference calling is available to discuss the information transmitted. Finally, the report is send back to the Remote Units. The number of cCTG traces performed was constantly increasing, despite the progressive reduction in the number of peripheral units involved. Pregnant women in Remote Unit group were younger and overweight and showed a higher incidence of diabetes and fetal defects than Operations Center ones. Moreover, a high rate of African migrant women and low socioeconomic and cultural standards were found in Remote Unit group. The cost analysis showed an economic advantage both in the reduction of inappropriate admissions and in the improvement of admission indicators (hospital stay days) for pregnant women. The global economic recession has had a significant impact on the Italian regional healthcare system and socioeconomic deprivation. Telemedicine could avoid unnecessary referral to Level III centers (Hospital) in Campania region, where the average population density is very high, allowing equal access to ultra-specialist assessment irrespective of the geographical location of the pregnant woman with medium to high risk, as well as rationalizing the costs for maternal and fetal care.
Bonnett, Carl J; Schock, Tony R; McVaney, Kevin E; Colwell, Christopher B; Depass, Christopher
2007-01-01
After Hurricane Katrina struck the Gulf Coast of the United States on 29 August 2005, it became obvious that the country was facing an enormous national emergency. With local resources overwhelmed, governors across the US responded by deploying thousands of National Guard soldiers and airmen. The National Guard has responded to domestic disasters due to natural hazards since its inception, but an event with the magnitude of Hurricane Katrina was unprecedented. The deployment of >900 Army National Guard soldiers to St. Bernard Parish, Louisiana in the aftermath of the Hurricane was studied to present some of the operational issues involved with providing medical support for this type of operation. In doing so, the authors attempt to address some of the larger issues of how the National Guard can be incorporated into domestic disaster response efforts. A number of unforeseen issues with regards to medical operations, medical supply, communication, preventive medicine, legal issues, and interactions with civilians were encountered and are reviewed. A better understanding of the National Guard and how it can be utilized more effectively in future disaster response operations can be developed.
System for Anomaly and Failure Detection (SAFD) system development
NASA Technical Reports Server (NTRS)
Oreilly, D.
1992-01-01
This task specified developing the hardware and software necessary to implement the System for Anomaly and Failure Detection (SAFD) algorithm, developed under Technology Test Bed (TTB) Task 21, on the TTB engine stand. This effort involved building two units; one unit to be installed in the Block II Space Shuttle Main Engine (SSME) Hardware Simulation Lab (HSL) at Marshall Space Flight Center (MSFC), and one unit to be installed at the TTB engine stand. Rocketdyne personnel from the HSL performed the task. The SAFD algorithm was developed as an improvement over the current redline system used in the Space Shuttle Main Engine Controller (SSMEC). Simulation tests and execution against previous hot fire tests demonstrated that the SAFD algorithm can detect engine failure as much as tens of seconds before the redline system recognized the failure. Although the current algorithm only operates during steady state conditions (engine not throttling), work is underway to expand the algorithm to work during transient condition.
Work stress of women in sewing machine operation.
Nag, A; Desai, H; Nag, P K
1992-06-01
The study examined the work stresses of 107 women who were engaged in sewing machine operation in small garment manufacturing units. Of the three types of sewing machines (motor-operated, full and half shuttle foot-operated), 74% of the machines were foot-operated, where throttle action of the lower limb is required to move the shuttle of the machine. The motor-operated machines were faster than the foot-operated machines. The short cycle sewing work involves repetitive action of hand and feet. The women had to maintain a constant seated position on a stool without backrest and the body inclined forward. Long-term sewing work had a cumulative load on the musculo-skeletal structures, including the vertebral column and reflected in the form of high prevalence of discomfort and pain in different body parts. About 68% of the women complained of back pain, among whom 35% reported a persistent low back pain. Common sewing work accident is piercing of the needle through the fingers, particularly the right forefingers. Unsatisfactory man-machine incompatibility, work posture and fatigue, improper coordination of eye, leg and hand are the major problems of the operators. The design mis-match of the work place may be significantly improved by taking women's anthropometric dimensions in modifying the workplace, i.e. the seat surface, seat height, work height, backrest, etc.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-05
... Products, Inc., Mckeesport Tubular Operations Division, Subsidiary of United States Steel Corporation, Mckeesport, PA; Notice of Initiation of Investigation To Terminate Certification of Eligibility Pursuant to... Tubular Products, McKeesport Tubular Operations Division, Subsidiary of United States Steel Corporation...
NASA Technical Reports Server (NTRS)
Madura, John T.; Bauman, William H.; Merceret, Francis J.; Roeder, William P.; Brody, Frank C.; Hagemeyer, Bartlett C.
2010-01-01
The Applied Meteorology Unit (AMU) provides technology transition and technique development to improve operational weather support to the Space Shuttle and the entire American space program. The AMU is funded and managed by NASA and operated by a contractor that provides five meteorologists with a diverse mix of advanced degrees, operational experience, and associated skills including data processing, statistics, and the development of graphical user interfaces. The AMU's primary customers are the U.S. Air Force 45th Weather Squadron at Patrick Air Force Base, the National Weather Service Spaceflight Meteorology Group at NASA Johnson Space Center, and the National Weather Service Melbourne FL Forecast Office. The AMU has transitioned research into operations for nineteen years and worked on a wide range of topics, including new forecasting techniques for lightning probability, synoptic peak winds,.convective winds, and summer severe weather; satellite tools to predict anvil cloud trajectories and evaluate camera line of sight for Space Shuttle launch; optimized radar scan strategies; evaluated and implemented local numerical models; evaluated weather sensors; and many more. The AMU has completed 113 projects with 5 more scheduled to be completed by the end of 2010. During this rich history, the AMU and its customers have learned many lessons on how to effectively transition research into operations. Some of these lessons learned include collocating with the operational customer and periodically visiting geographically separated customers, operator submitted projects, consensus tasking process, use of operator primary advocates for each project, customer AMU liaisons with experience in both operations and research, flexibility in adapting the project plan based on lessons learned during the project, and incorporating training and other transition assistance into the project plans. Operator involvement has been critical to the AMU's remarkable success and many awards from NASA, the National Weather Association, and two citations from the Navy's Center of Excellence for Best Manufacturing Practices. This paper will present the AMU's proven methods and explain how they may be applied by other organizations to effectively transition research into operations.
Search and rescue trends associated with recreational travel in US national parks.
Heggie, Travis W; Heggie, Tracey M
2009-01-01
National parks are popular travel destinations worldwide. Unfortunately, negative health experiences can and do occur during travel in national parks. This study investigated search and rescue (SAR) trends associated with recreational travel in US National Park Service (NPS) units. A retrospective study was conducted of the Annual US National Park Service Search and Rescue Report for the years 2003 to 2006. From 2003 to 2006, there were 12,337 SAR operations involving 15,537 visitors. The total operational costs were US$16,552,053. The operations ended with 522 fatalities, 4,860 ill or injured visitors, and 2,855 saves. Almost half (40%) of the operations occurred on Saturday and Sunday, and visitors aged 20 to 29 years were involved in 23% of the incidents. Males accounted for 66.3% of the visitors requiring SAR assistance. Day hiking, motorized boating, swimming, overnight hiking, and nonmotorized boating were the participant activities resulting in the most SAR operations. The vast majority of visitors requiring SAR assistance were located within a 24-hour period, and the most common rescue environments were mountain areas between 1,524 and 4,572 m, lakes, rivers, oceans, and coastal areas. An error in judgment, fatigue and physical conditions, and insufficient equipment, clothing, and experience were the most common contributing factors. SAR incidents can be expensive and end with severe health consequences. NPS management should develop education and preventive efforts focused on hikers, boaters, and swimmers who are males and aged 20 to 29 years, addressing issues of adequate judgment, preparation, and experience.
Harte, Philip T.
2013-01-01
Tetrachloroethylene (PCE), a volatile organic compound, was detected in groundwater from deep (more than (>) 300 feet (ft) below land surface) fractures in monitoring wells tapping a crystalline-rock aquifer beneath operable unit 1 (OU1) of the Savage Municipal Well Superfund site (Weston, Inc., 2010). Operable units define remedial areas of contaminant concern. PCE contamination within the fractured-rock aquifer has been designated as a separate operable unit, operable unit 3 (OU3; Weston, Inc., 2010). PCE contamination was previously detected in the overlying glacial sand and gravel deposits and basal till, hereafter termed the Milford-Souhegan glacial-drift (MSGD) aquifer (Harte, 2004, 2006). Operable units 1 and 2 encompass areas within the MSGD aquifer, whereas the extent of the underlying OU3 has yet to be defined. The primary original source of contamination has been identified as a former manufacturing facility—the OK Tool manufacturing facility; hence OU1 sometimes has been referred to as the OK Tool Source Area (New Hampshire Department of Environmental Services, undated). A residential neighborhood of 30 to 40 houses is located in close proximity (one-quarter of a mile) from the PCE-contaminated monitoring wells. Each house has its own water-supply well installed in similar rocks as those of the monitoring wells, as indicated by the New Hampshire State geologic map (Lyons and others, 1997). An investigation was initiated in 2010 by the U.S. Environmental Protection Agency (USEPA) region 1, and the New Hampshire Department of Environmental Services (NHDES) to assess the potential for PCE transport from known contaminant locations (monitoring wells) to the residential wells. The U.S. Geological Survey (USGS) and the NHDES entered into a cooperative agreement in 2011 to assist in the evaluation of PCE transport in the fractured-rock aquifer. Periodic sampling over the last decade by the USEPA and NHDES has yet to detect PCE in groundwater from the residential-supply wells (as of 2012). However, part of assessing the potential for PCE transport involves understanding the origin of the groundwater in the monitoring and residential wells. One of the tools in delineating the movement of groundwater to wells, particularly in complex, highly heterogeneous fractured-rock aquifers, is the understanding of the geochemical and isotopic composition of groundwater (Lipfert and Reeve, 2004; Harte and others, 2012). This report summarizes findings from analyses of geochemical, isotopic, and dissolved gas characteristics of groundwater. Samples of groundwater were collected in 2011 from monitoring wells and nearby residential-supply wells in proximity to OU1.
Propulsion Technology Lifecycle Operational Analysis
NASA Technical Reports Server (NTRS)
Robinson, John W.; Rhodes, Russell E.
2010-01-01
The paper presents the results of a focused effort performed by the members of the Space Propulsion Synergy Team (SPST) Functional Requirements Sub-team to develop propulsion data to support Advanced Technology Lifecycle Analysis System (ATLAS). This is a spreadsheet application to analyze the impact of technology decisions at a system-of-systems level. Results are summarized in an Excel workbook we call the Technology Tool Box (TTB). The TTB provides data for technology performance, operations, and programmatic parameters in the form of a library of technical information to support analysis tools and/or models. The lifecycle of technologies can be analyzed from this data and particularly useful for system operations involving long running missions. The propulsion technologies in this paper are listed against Chemical Rocket Engines in a Work Breakdown Structure (WBS) format. The overall effort involved establishing four elements: (1) A general purpose Functional System Breakdown Structure (FSBS). (2) Operational Requirements for Rocket Engines. (3) Technology Metric Values associated with Operating Systems (4) Work Breakdown Structure (WBS) of Chemical Rocket Engines The list of Chemical Rocket Engines identified in the WBS is by no means complete. It is planned to update the TTB with a more complete list of available Chemical Rocket Engines for United States (US) engines and add the Foreign rocket engines to the WBS which are available to NASA and the Aerospace Industry. The Operational Technology Metric Values were derived by the SPST Sub-team in the form of the TTB and establishes a database for users to help evaluate and establish the technology level of each Chemical Rocket Engine in the database. The Technology Metric Values will serve as a guide to help determine which rocket engine to invest technology money in for future development.
Attack Helicopter Operations: Art or Science
1991-05-13
ATTACK HELICOPTER OPERATIONS: ART OR SCIENCE ? BY LIEUTENANT COLONEL JAN CALLEN United States Army DISTRIBUTION STATEMENT A: Approved for public release...TASK IWORK UNIT ELEMENT NO. NO. NO. ACCESSION NC 11. TITLE (Include Socurity Classification) Attack Helicopter Operations: Art or Science ? 12. PERSONAL...OPERATIONS: ART OR SCIENCE ? AN INDIVIDUAL STUDY PROJECT by Lieutenant Colonel Jan Callen United States Army Colonel Greg Snelgrove Project Adviser U.S
The United States Army’s Full-Spectrum Training Strategy Challenge
2012-05-17
the high operational tempo for deployed and deploying units. Soldiers and units conducted repeat deployments to both Iraq and Afghanistan with little...prevalent in Strategic Operational Design and associated variations of design. Further complicating Israeli ideas of warfare was the notion that...Army to develop an overarching operational framework that finally replaces Airland Battle, like EBO or some variation of operational design. But one
Code of Federal Regulations, 2011 CFR
2011-07-01
... for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). 60.105a Section 60.105a... and operations for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). (a) FCCU and... Emission Standards for Hazardous Air Pollutants for Petroleum Refineries: Catalytic Cracking Units...
Code of Federal Regulations, 2010 CFR
2010-07-01
... for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). 60.105a Section 60.105a... and operations for fluid catalytic cracking units (FCCU) and fluid coking units (FCU). (a) FCCU and... Emission Standards for Hazardous Air Pollutants for Petroleum Refineries: Catalytic Cracking Units...
Establishing Final Cleanup Decisions for the Hanford Site River Corridor
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lerch, J.A.; Sands, J.P.
2007-07-01
A major challenge in the River Corridor Closure Contract is establishing final cleanup decisions for the source operable units in the Hanford Site river corridor. Cleanup actions in the river corridor began in 1994 and have been performed in accordance with a 'bias for action' approach adopted by the Tri-Parties - the U.S. Department of Energy, U.S. Environmental Protection Agency, and Washington State Department of Ecology. This approach enabled early application of cleanup dollars on actual remediation of contaminated waste sites. Consequently, the regulatory framework authorizing cleanup actions at source operable units in the river corridor consists largely of interimmore » action records of decision, which were supported by qualitative risk assessments. Obtaining final cleanup decisions for the source operable units is necessary to determine whether past cleanup actions in the river corridor are protective of human health and the environment and to identify any course corrections that may be needed to ensure that ongoing and future cleanup actions are protective. Because the cleanup actions are ongoing, it is desirable to establish the final cleanup decisions as early as possible to minimize the impacts of any identified course corrections to the present cleanup approach. Development of a strategy to obtain final cleanup decisions for the source operable units in a manner that is responsive to desires for an integrated approach with the groundwater and Columbia River components while maintaining the ability to evaluate each component on its own merit represents a significant challenge. There are many different options for grouping final cleanup decisions, and each involved party or stakeholder brings slightly different interests that shape the approach. Regardless of the selected approach, there are several specific challenges and issues to be addressed before making final cleanup decisions. A multi-agency and contractor working group has been established to address these issues and develop an endorsed strategy. Ultimately, it is anticipated that the Tri-Parties will establish a set of milestones to document pathway selection and define schedule requirements. (authors)« less
Shortcomings with Tree-Structured Edge Encodings for Neural Networks
NASA Technical Reports Server (NTRS)
Hornby, Gregory S.
2004-01-01
In evolutionary algorithms a common method for encoding neural networks is to use a tree structured assembly procedure for constructing them. Since node operators have difficulties in specifying edge weights and these operators are execution-order dependent, an alternative is to use edge operators. Here we identify three problems with edge operators: in the initialization phase most randomly created genotypes produce an incorrect number of inputs and outputs; variation operators can easily change the number of input/output (I/O) units; and units have a connectivity bias based on their order of creation. Instead of creating I/O nodes as part of the construction process we propose using parameterized operators to connect to preexisting I/O units. Results from experiments show that these parameterized operators greatly improve the probability of creating and maintaining networks with the correct number of I/O units, remove the connectivity bias with I/O units and produce better controllers for a goal-scoring task.
50 CFR 300.219 - Vessel monitoring system.
Code of Federal Regulations, 2011 CFR
2011-10-01
.... The vessel owner and operator shall continuously operate the VMS unit at all times, except that the...) of this section, provided that the VMS unit is operated continuously and at all times while the... device that is capable of real-time communication with the SAC. The VMS unit used to fulfill the...
50 CFR 300.219 - Vessel monitoring system.
Code of Federal Regulations, 2013 CFR
2013-10-01
.... The vessel owner and operator shall continuously operate the VMS unit at all times, except that the...) of this section, provided that the VMS unit is operated continuously and at all times while the... device that is capable of real-time communication with the SAC. The VMS unit used to fulfill the...
Code of Federal Regulations, 2011 CFR
2011-07-01
... requirements for my municipal waste combustion unit? 60.1200 Section 60.1200 Protection of Environment... SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is... Good Combustion Practices: Operating Requirements § 60.1200 What are the operating practice...
Code of Federal Regulations, 2012 CFR
2012-07-01
... requirements for my municipal waste combustion unit? 60.1200 Section 60.1200 Protection of Environment... SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is... Good Combustion Practices: Operating Requirements § 60.1200 What are the operating practice...
Code of Federal Regulations, 2013 CFR
2013-07-01
... requirements for my municipal waste combustion unit? 60.1200 Section 60.1200 Protection of Environment... SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is... Good Combustion Practices: Operating Requirements § 60.1200 What are the operating practice...
Code of Federal Regulations, 2014 CFR
2014-07-01
... requirements for my municipal waste combustion unit? 60.1200 Section 60.1200 Protection of Environment... SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is... Good Combustion Practices: Operating Requirements § 60.1200 What are the operating practice...
Code of Federal Regulations, 2010 CFR
2010-07-01
... requirements for my municipal waste combustion unit? 60.1200 Section 60.1200 Protection of Environment... SOURCES Standards of Performance for Small Municipal Waste Combustion Units for Which Construction is... Good Combustion Practices: Operating Requirements § 60.1200 What are the operating practice...
30 CFR 250.1301 - What are the requirements for unitization?
Code of Federal Regulations, 2010 CFR
2010-07-01
... delineated and productive reservoir if unitized operations are necessary to: (1) Prevent waste; (2) Conserve... more reservoirs and the initiation of actual development drilling or production operations and that... OFFSHORE OIL AND GAS AND SULPHUR OPERATIONS IN THE OUTER CONTINENTAL SHELF Unitization § 250.1301 What are...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-30
... Programmatic Environmental Impact Statement (December 1995) and Reservoir Operations Study Final Programmatic.... Completion and operation of the 1,260-MW Bellefonte Unit 1 was one of the resource options analyzed in the..., Completion and Operation of Bellefonte Unit 1, as TVA's [[Page 53995
50 CFR 300.219 - Vessel monitoring system.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... The vessel owner and operator shall continuously operate the VMS unit at all times, except that the...) of this section, provided that the VMS unit is operated continuously and at all times while the... device that is capable of real-time communication with the SAC. The VMS unit used to fulfill the...
Operating unit time use is associated with anaesthesia type in below-knee surgery in adults.
Lohela, T J; Chase, R P; Hiekkanen, T A; Kontinen, V K; Hynynen, M J
2017-03-01
Peripheral nerve blocks could reduce the operating unit and theatre time spent on high-risk patients who are particularly vulnerable to complications of general anaesthesia or have medications that prevent application of central neuraxial blocks. Medical record data of 617 and 254 elderly adults undergoing below-knee surgery in Jorvi and Meilahti hospitals (Helsinki University Hospital) between January 2010 and December 2012 were used to investigate the influence of anaesthetic technique on operating theatre times and on operating unit times using flexible parametric survival models. We report operating theatre and unit exit ratios (i.e. hazard ratios but using ratios of exit rates) for different types of anaesthesia. Adjusted analyses: In Jorvi Hospital, anaesthesia type was associated with large initial differentials in operating theatre times. The theatre exit ratios remained lower for general anaesthesia and central neuraxial blocks compared to peripheral nerve blocks until 30 min. In Meilahti Hospital, anaesthesia type did not influence theatre time, but was the best predictor of operating unit times. Compared to peripheral nerve blocks, the exit ratio remained lower for general anaesthesia until five operating unit hours in both hospitals and for central neuraxial blocks until 1 h in Meilahti Hospital and until 3 h in Jorvi Hospital. Holding area was used more in Jorvi Hospital compared to Meilahti Hospital. Peripheral nerve block anaesthesia reduces time spent in the operating unit and can reduce time spent in the operating theatre if induced in holding area outside of theatre. © 2017 The Acta Anaesthesiologica Scandinavica Foundation. Published by John Wiley & Sons Ltd.
Psychoeducational preparation of children for surgery: the importance of parental involvement.
Li, Ho Cheung William; Lopez, Violeta; Lee, Tin Loi Isabel
2007-01-01
To examine the effects of therapeutic play intervention on outcomes of children undergoing day surgery, and to highlight the importance of parental involvement in the psychoeducational preparation of children for surgery. A randomized controlled trial, two group pre-test and repeated post-test, between subjects design was employed. Hong Kong Chinese children (7-12 years of age; n=203) admitted for elective surgery in a day surgery unit, along with their parents during a 13-month period, were invited to participate in the study. By using a simple complete randomization method, 97 of children with their parents were assigned to the experimental group receiving therapeutic play intervention, and 106 children with their parents were assigned to the control group receiving routine information preparation. The results showed that both children and their parents in the experimental group reported lower state anxiety scores in pre- and post-operative periods. Children in the experimental group exhibited fewer instances of negative emotional behaviors and parents in the experimental group reported greater satisfaction. The results, however, find no differences in children's post-operative pain between the two groups. The study provides empirical evidence to support the effectiveness of using therapeutic play intervention and the importance of parental involvement in the psychoeducational preparation of children for surgery. The findings heighten the awareness of the importance of integrating therapeutic play and parental involvement as essential components of holistic and quality nursing care to prepare children for surgery.
NASA Astrophysics Data System (ADS)
Mukminna, Halimahtus; Isnandar, Muladi
2017-09-01
Purpose of this research was to determine the contribution of student involvement in production/ service unit (X1), experience of industry practices (X2), and entrepreneurial attitude (Y) towards readiness entrepreneurship (Z) of vocational student regional Malang. The design of the study using a quantitative approach. The samples used as many as 130 respondents. Instruments used for collecting data in the form of questionnaires. Data analysis included descriptive and test of hypothesis. The result showed: that the description of data on the level of student involvement in production/ service unit, experience of industry practices, entrepreneurial attitude and entrepreneurship readiness in the high category. The contribution student involvement in production/ service unit of entrepreneurial attitude of 10.6%. The contribution experience of industry practices of entrepreneurial attitude of 17.4%. The contribution student involvement in production/ service unit and experience of industry practices simultaneously to entrepreneurial attitude of 44.1%. The contribution student involvement in production/ service unit of readiness entrepreneurship of 4%. The contribution experience of industry practices of readiness entrepreneurship of 5%. The contribution entrepreneurial attitude of readiness entrepreneurship of 16%. Finally, the contribution student involvement in production/ service unit, experience of industry practices, and entrepreneurial attitude simultaneously to readiness entrepreneurship of 50.3%.
Code of Federal Regulations, 2012 CFR
2012-07-01
... operation operated in a batch mode. Block polymer means a polymer where the polymerization is controlled... frequent block average values. Continuous unit operation means a unit operation operated in a continuous... (EPM) result from the polymerization of ethylene and propylene and contain a saturated chain of the...
Code of Federal Regulations, 2013 CFR
2013-07-01
... operation operated in a batch mode. Block polymer means a polymer where the polymerization is controlled... frequent block average values. Continuous unit operation means a unit operation operated in a continuous... (EPM) result from the polymerization of ethylene and propylene and contain a saturated chain of the...
Code of Federal Regulations, 2014 CFR
2014-07-01
... operation operated in a batch mode. Block polymer means a polymer where the polymerization is controlled... frequent block average values. Continuous unit operation means a unit operation operated in a continuous... (EPM) result from the polymerization of ethylene and propylene and contain a saturated chain of the...
NASA Technical Reports Server (NTRS)
Putcha, Chandra S.; Mikula, D. F. Kip; Dueease, Robert A.; Dang, Lan; Peercy, Robert L.
1997-01-01
This paper deals with the development of a reliability methodology to assess the consequences of using hardware, without failure analysis or corrective action, that has previously demonstrated that it did not perform per specification. The subject of this paper arose from the need to provide a detailed probabilistic analysis to calculate the change in probability of failures with respect to the base or non-failed hardware. The methodology used for the analysis is primarily based on principles of Monte Carlo simulation. The random variables in the analysis are: Maximum Time of Operation (MTO) and operation Time of each Unit (OTU) The failure of a unit is considered to happen if (OTU) is less than MTO for the Normal Operational Period (NOP) in which this unit is used. NOP as a whole uses a total of 4 units. Two cases are considered. in the first specialized scenario, the failure of any operation or system failure is considered to happen if any of the units used during the NOP fail. in the second specialized scenario, the failure of any operation or system failure is considered to happen only if any two of the units used during the MOP fail together. The probability of failure of the units and the system as a whole is determined for 3 kinds of systems - Perfect System, Imperfect System 1 and Imperfect System 2. in a Perfect System, the operation time of the failed unit is the same as that of the MTO. In an Imperfect System 1, the operation time of the failed unit is assumed as 1 percent of the MTO. In an Imperfect System 2, the operation time of the failed unit is assumed as zero. in addition, simulated operation time of failed units is assumed as 10 percent of the corresponding units before zero value. Monte Carlo simulation analysis is used for this study. Necessary software has been developed as part of this study to perform the reliability calculations. The results of the analysis showed that the predicted change in failure probability (P(sub F)) for the previously failed units is as high as 49 percent above the baseline (perfect system) for the worst case. The predicted change in system P(sub F) for the previously failed units is as high as 36% for single unit failure without any redundancy. For redundant systems, with dual unit failure, the predicted change in P(sub F) for the previously failed units is as high as 16%. These results will help management to make decisions regarding the consequences of using previously failed units without adequate failure analysis or corrective action.
NASA Astrophysics Data System (ADS)
S, Chidambara Raja; P, Karthikeyan; Kumaraswamidhas, L. A.; M, Ramu
2018-05-01
Most of the thermal design systems involve two phase materials and analysis of such systems requires detailed understanding of the thermal characteristics of the two phase material. This article aimed to develop geometry dependent unit cell approach model by considering the effects of all primary parameters (conductivity ratio and concentration) and secondary parameters (geometry, contact resistance, natural convection, Knudsen and radiation) for the estimation of effective thermal conductivity of two-phase materials. The analytical equations have been formulated based on isotherm approach for 2-D and 3-D spatially periodic medium. The developed models are validated with standard models and suited for all kind of operating conditions. The results have shown substantial improvement compared to the existing models and are in good agreement with the experimental data.
Linking nursing unit's culture to organizational effectiveness: a measurement tool.
Casida, Jesus
2008-01-01
Organizational culture consists of the deep underlying assumptions, beliefs, and values that are shared by members of the organization and typically operate unconsciously. The four organizational culture traits of the Denison Organizational Culture Model (DOCM) are characteristics of organizational effectiveness, which include adaptability, involvement, consistency, and mission. Effective organizations demonstrate high levels of the four cultural traits which reflect their ability to balance the dynamic tension between the need for stability and the need for flexibility within the organization. The Denison Organizational Culture Survey (DOCS) is a measurement tool that was founded on the theoretical framework of the DOCM, and in the field of business, is one of the most commonly used tools for measuring organizational culture. The DOCS offers a promising approach to operationalizing and measuring the link between organizational culture and organizational effectiveness in the context of nursing units.
Demonstration of a PC 25 Fuel Cell in Russia
DOE Office of Scientific and Technical Information (OSTI.GOV)
John C. Trocciola; Thomas N. Pompa; Linda S. Boyd
2004-09-01
This project involved the installation of a 200kW PC25C{trademark} phosphoric-acid fuel cell power plant at Orgenergogaz, a Gazprom industrial site in Russia. In April 1997, a PC25C{trademark} was sold by ONSI Corporation to Orgenergogaz, a subsidiary of the Russian company ''Gazprom''. Due to instabilities in the Russian financial markets, at that time, the unit was never installed and started by Orgenergogaz. In October of 2001 International Fuel Cells (IFC), now known as UTC Fuel Cells (UTCFC), received a financial assistance award from the United States Department of Energy (DOE) entitled ''Demonstration of PC 25 Fuel Cell in Russia''. Three majormore » tasks were part of this award: the inspection of the proposed site and system, start-up assistance, and installation and operation of the powerplant.« less
SAMS Acceleration Measurements on Mir from June to November 1995
NASA Technical Reports Server (NTRS)
DeLombard, Richard; Hrovat, Ken; Moskowitz, Milton; McPherson, Kevin
1996-01-01
The NASA Microgravity Science and Applications Division (MSAD) sponsors science experiments on a variety of microgravity carriers, including sounding rockets, drop towers, parabolic aircraft, and Orbiter missions. The MSAD sponsors the Space Acceleration Measurement System (SAMS) to support microgravity science experiments with acceleration measurements to characterize the microgravity environment to which the experiments were exposed. The Principal Investigator Microgravity Services project at the NASA Lewis Research Center supports principal investigators of microgravity experiments as they evaluate the effects of varying acceleration levels on their experiments. In 1993, a cooperative effort was started between the United States and Russia involving science utilization of the Russian Mir space station by scientists from the United States and Russia. MSAD is currently sponsoring science experiments participating in the Shuttle-Mir Science Program in cooperation with the Russians on the Mir space station. Included in the complement of MSAD experiments and equipment is a SAMS unit In a manner similar to Orbiter mission support, the SAMS unit supports science experiments from the U.S. and Russia by measuring the microgravity environment during experiment operations. The initial SAMS supported experiment was a Protein Crystal Growth (PCG) experiment from June to November 1995. SAMS data were obtained during the PCG operations on Mir in accordance with the PCG Principal Investigator's requirements. This report presents an overview of the SAMS data recorded to support this PCG experiment. The report contains plots of the SAMS 100 Hz sensor head data as an overview of the microgravity environment, including the STS-74 Shuttle-Mir docking.
Datta, Vivek; Engledow, Alec; Chan, Shirley; Forbes, Alastair; Cohen, C Richard; Windsor, Alastair
2010-02-01
Enterocutaneous fistula associated with type 2 intestinal failure is a challenging condition that involves a multidisciplinary approach to management. It is suggested that complex cases should only be managed in select national centers in the United Kingdom. Over an 18-month period, we prospectively studied all patients referred to us with established enterocutaneous fistulas. Patients followed standardized protocols. Eradication of sepsis, appropriate wound management, establishment of nutritional support, and restoration of normal physiology were attempted. Definitive surgical management was deferred for at least 6 months after the last abdominal surgical intervention. Follow-up was for a minimum of 6 months. Of 55 patients, 10 were internal referrals and 45 were from institutions elsewhere. The mean age was 50 years. Nine patients had colonic fistulas. Forty-six had small bowel fistulas; 19 of these (35%) were associated with inflammatory bowel disease. Patients had undergone a median of 3 previous operations. Four fistulas (7%) healed spontaneously. Thirty-five patients (63%) underwent definitive surgery. Recurrent fistula occurred in 4 patients (13%); 1 required further surgery, and 3 healed spontaneously. The overall mortality rate was 7% (4/55 patients), with 3 patients dying before definitive surgery and 1 patient dying postoperatively. Our results compare favorably with data from designated national centers (overall mortality, 9.5%-10.8%; operative mortality, 3%-3.5%), suggesting that these patients can be effectively managed in regional units that have sufficient expertise, interest, and volume of patients. Rationalization of funding and referral of patients with type 2 intestinal failure to regional centers may allow national centers to conserve their scarce resources.
Prevention and control of blood stream infection using the balanced scorecard approach.
Rohsiswatmo, Rinawati; Rafika, Sarah; Marsubrin, Putri M T
2014-07-01
to obtain formulation of an effective and efficient strategy to overcome blood stream infection (BSI). operational research design with qualitative and quantitative approach. The study was divided into two stages. Stage I was an operational research with problem solving approach using qualitative and quantitative method. Stage II was performed using quantitative method, a form of an interventional study on strategy implementation, which was previously established in stage I. The effective and efficient strategy for the prevention and control of infection in neonatal unit Cipto Mangunkusumo (CM) Hospital was established using Balanced Scorecard (BSC) approach, which involved several related processes. the BSC strategy was proven to be effective and efficient in substantially reducing BSI from 52.31°/oo to 1.36°/oo in neonates with birth weight (BW) 1000-1499 g (p=0.025), and from 29.96°/oo to 1.66°/oo in BW 1500-1999 g (p=0.05). Gram-negative bacteria still predominated as the main cause of BSI in CMH Neonatal Unit. So far, the sources of the microorganisms were thought to be from the environment of treatment unit (tap water filter and humidifying water in the incubator). Significant reduction was also found in neonatal mortality rate weighing 1000-1499 g at birth, length of stay, hospitalization costs, and improved customer satisfaction. effective and efficient infection prevention and control using BSC approach could significantly reduce the rate of BSI. This approach may be applied for adult patients in intensive care unit with a wide range of adjustment.
40 CFR 63.1281 - Control equipment requirements.
Code of Federal Regulations, 2012 CFR
2012-07-01
... dehydration unit baseline operations (as defined in § 63.1271). Records of glycol dehydration unit baseline... the Administrator's satisfaction, the conditions for which glycol dehydration unit baseline operations... emission reduction of 95.0 percent for the glycol dehydration unit process vent. Only modifications in...
40 CFR 63.1281 - Control equipment requirements.
Code of Federal Regulations, 2011 CFR
2011-07-01
... dehydration unit baseline operations (as defined in § 63.1271). Records of glycol dehydration unit baseline... the Administrator's satisfaction, the conditions for which glycol dehydration unit baseline operations... emission reduction of 95.0 percent for the glycol dehydration unit process vent. Only modifications in...
Yue, Xun; Li, Xing Guo; Gao, Xin-Qi; Zhao, Xiang Yu; Dong, Yu Xiu; Zhou, Chao
2016-09-02
Phytohormone synergies and signaling interdependency are important topics in plant developmental biology. Physiological and genetic experimental evidence for phytohormone crosstalk has been accumulating and a genome-scale enzyme correlation model representing the Arabidopsis metabolic pathway has been published. However, an integrated molecular characterization of phytohormone crosstalk is still not available. A novel modeling methodology and advanced computational approaches were used to construct an enzyme-based Arabidopsis phytohormone crosstalk network (EAPCN) at the biosynthesis level. The EAPCN provided the structural connectivity architecture of phytohormone biosynthesis pathways and revealed a surprising result; that enzymes localized at the highly connected nodes formed a consecutive metabolic route. Furthermore, our analysis revealed that the transcription factors (TFs) that regulate enzyme-encoding genes in the consecutive metabolic route formed structures, which we describe as circular control units operating at the transcriptional level. Furthermore, the downstream TFs in phytohormone signal transduction pathways were found to be involved in the circular control units that included the TFs regulating enzyme-encoding genes. In addition, multiple functional enzymes in the EAPCN were found to be involved in ion and pH homeostasis, environmental signal perception, cellular redox homeostasis, and circadian clocks. Last, publicly available transcriptional profiles and a protein expression map of the Arabidopsis root apical meristem were used as a case study to validate the proposed framework. Our results revealed multiple scales of coupled mechanisms in that hormonal crosstalk networks that play a central role in coordinating internal developmental processes with environmental signals, and give a broader view of Arabidopsis phytohormone crosstalk. We also uncovered potential key regulators that can be further analyzed in future studies.
Multi-unit Operations in Non-Nuclear Systems: Lessons Learned for Small Modular Reactors
DOE Office of Scientific and Technical Information (OSTI.GOV)
OHara J. M.; Higgins, J.; DAgostino, A.
2012-01-17
The nuclear-power community has reached the stage of proposing advanced reactor designs to support power generation for decades to come. Small modular reactors (SMRs) are one approach to meet these energy needs. While the power output of individual reactor modules is relatively small, they can be grouped to produce reactor sites with different outputs. Also, they can be designed to generate hydrogen, or to process heat. Many characteristics of SMRs are quite different from those of current plants and may be operated quite differently. One difference is that multiple units may be operated by a single crew (or a singlemore » operator) from one control room. The U.S. Nuclear Regulatory Commission (NRC) is examining the human factors engineering (HFE) aspects of SMRs to support licensing reviews. While we reviewed information on SMR designs to obtain information, the designs are not completed and all of the design and operational information is not yet available. Nor is there information on multi-unit operations as envisioned for SMRs available in operating experience. Thus, to gain a better understanding of multi-unit operations we sought the lesson learned from non-nuclear systems that have experience in multi-unit operations, specifically refineries, unmanned aerial vehicles and tele-intensive care units. In this paper we report the lessons learned from these systems and the implications for SMRs.« less
Operations: A Comparative Study of the United States and Taiwan
ERIC Educational Resources Information Center
Lin, Cheng-Yao; Becker, Jerry; Byun, Mi-Ran; Yang, Der-Ching; Huang, Tsai-Wei
2013-01-01
This study examined (a) the differences in preservice teachers’ procedural knowledge in four areas of fraction operations in Taiwan and the United States, (b) the differences in preservice teachers’ conceptual knowledge in four areas of fraction operations in Taiwan and the United States, and (c) correlation in preservice teachers’ conceptual…
75 FR 9958 - Carolina Power & Light Company, Shearon Harris Nuclear Power Plant, Unit 1; Exemption
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-04
..., Shearon Harris Nuclear Power Plant, Unit 1; Exemption 1.0 Background Carolina Power & Light Company (the... Operating License No. NPF-63, which authorizes operation of the Shearon Harris Nuclear Power Plant, Unit 1... rule's compliance date for all operating nuclear power plants, but noted that the Commission's...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-07-01
This document provides an analysis of the potential impacts associated with the proposed action, which is continued operation of Naval Petroleum Reserve No. I (NPR-1) at the Maximum Efficient Rate (MER) as authorized by Public law 94-258, the Naval Petroleum Reserves Production Act of 1976 (Act). The document also provides a similar analysis of alternatives to the proposed action, which also involve continued operations, but under lower development scenarios and lower rates of production. NPR-1 is a large oil and gas field jointly owned and operated by the federal government and Chevron U.SA Inc. (CUSA) pursuant to a Unit Planmore » Contract that became effective in 1944; the government`s interest is approximately 78% and CUSA`s interest is approximately 22%. The government`s interest is under the jurisdiction of the United States Department of Energy (DOE). The facility is approximately 17,409 acres (74 square miles), and it is located in Kern County, California, about 25 miles southwest of Bakersfield and 100 miles north of Los Angeles in the south central portion of the state. The environmental analysis presented herein is a supplement to the NPR-1 Final Environmental Impact Statement of that was issued by DOE in 1979 (1979 EIS). As such, this document is a Supplemental Environmental Impact Statement (SEIS).« less
A cost analysis of family planning in Bangladesh.
Fiedler, J L; Day, L M
1997-01-01
This article presents a step-down cost analysis using secondary data sources from 26 Bangladesh non-government organizations (NGOs) providing family planning services under a US Agency for International Development-funded umbrella organization. The unit costs of the NGOs' Maternal-Child Health (MCH) clinics and community-based distribution (CBD) systems were calculated and found to be minimally different. Several simulations were conducted to investigate the impact of alternative cost-reduction measures. The more general financial analysis proved more insightful than the unit cost analysis in terms of identifying means by which to improve the efficiency of the family planning operations of these NGOs. The analysis revealed that 56 per cent of total expenditures in the two-tiered umbrella's organizational structure are incurred in management operations and overheads. Of the remaining 44 per cent of project expenditures, 39 per cent is spent on the CBD program and 5 per cent on the MCH clinics. Within the CBD program, most resources are spent providing 4 million contacts (two-thirds of the annual total) which do not involve contraceptive re-supply. The clinics devote more resources to providing MCH services than to providing family planning services. The findings suggest that significant savings could be generated by containing administrative costs, improving operational efficiency, and reducing unnecessary or redundant fieldworker contacts. The magnitude of the potential savings raises a fundamental question about the continued viability and sustainability of this supply-driven CBD strategy.
Manatee lays groundwork for commercial use of Orimulsion
DOE Office of Scientific and Technical Information (OSTI.GOV)
Makansi, J.
1994-09-01
This article describes the conversion of an oil fired plant to Orimulsion described as a fourth fossil fuel, Orimulsion will replace oil at FP and L's Manatee station. The project involves unique business arrangements as well as important combustion, emissions control, and fuel handling system modifications. Florida Power and Light Co (FP and L) spent several years investigating the use of Orimulsion, including a full-scale five-months demonstration at its Sanford Station Unit 4. Now, the utility has taken the next giant leap; it has committed to convert the Manatee station for full-scale use of this unique fuel. The resulting projectmore » breaks new ground in the electric-generating business in several ways, including these: It represents the first long-term commercial contract for use of Orimulsion in the US, and the largest commitment world-wide. It involves unique business arrangements--not the least of which is the second major contract at an electric-utility station for a third-party-owned and operated flue-gas desulfurization (FGD) system. It indicates risk-taking on the part of utilities--with two 800-MW units, Manatee embodies a substantial amount of FP and L's total and incremental capacity base.« less
Clua Espuny, J L; Baucells Lluís, J; Mauri Roselló, J A
1999-05-15
The main objective of this study is to calculate the point of financial balance in the geographical setting of the Tortosa PC Area, to evaluate the business results, and to reflect on the side-effects and potential problems of self-management. Retrospective and descriptive study. The units studied were the seven base health districts operating during 1997. The products or services considered for the calculation of income are included in the Order of 29/9/97. The overall result meant a deficit of 0.019 milliards. Pharmaceutical prescription accounted for 58.45% of the total cost. 96.26% of the total activity was products or services undertaken in the PCC, where 95.95% of the income was obtained. All the points of balance, except for in-home activity of nursing personnel, were above the activity recorded. The products with greatest volume were the most profitable overall for the business. 1. The overall result meant a subsidy to running costs of 0.019 milliards. 2. If it did not occur otherwise, our systems for recording activity would have to be adapted to the products financed and accountancy information at the operational unit level. 3. Given that what is measured can be improved, we can identify problems and synergically involve the clinics in improving service efficiency and at the same time achieving a higher level of responsibility for services in a new context of self-management both for each operational unit and overall. 4. Defining the point of financial balance has to enable a framework of target incentives to be established by means of simultaneous information on cost and profit elements in the activity undertaken.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1993-09-01
The decision document presents the selected interim remedial action for Operable Unit 9 (OU9) at the Defense General Supply Center (DGSC) in Chesterfield County, Virginia near Richmond. OU9 pertains to groundwater beneath Area 50, the Open Storage Area (OSA), and the Naitonal Guard Area (NGA). This operable unit is the third of nine operable units that are currently being addressed at the DGSC. OU9 addresses interim treatment and containment of groundwater in the upper and lower aquifers beneath Area 50, the OSA, and the NGA.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Anderson, J.C.
1994-01-15
Anderman/Smith Operating Co. is operating a secondary oil recovery project involving the Carter sandstone in northwest Alabama. The project objectives are: (1) to increase the ultimate economic recovery of oil from the Carter reservoirs, thereby increasing domestic reserves and lessening US dependence on foreign oil; (2) to extensively model, test, and monitor the reservoirs so their management is optimized; and (3) to assimilate and transfer the information and results gathered to other US oil companies to encourage them to attempt similar projects. As a result of waterflood operations at the Central Buff unit, oil production from the Fowler Brasher 7--9more » well increased to 40--50 stb/d in late October, and averaged about 45 stb/d in November with no measurable water production. Production at the Fowler Dodson 8--12 was more erratic during the same period. In October, the oil rate for this well increased to nearly 17 stb/d with no reported water production. However, in November the oil production rate declined to about 9 stb/d with an associated average water rate of nearly 17 bpd. Water analysis showed that this produced water was significantly fresher than the connate water produced prior to waterflood operations. This provides evidence for early breakthrough of water injected at the Jones 7--16 well and will be an important consideration in the reservoir modeling study being performed for the unit. There has been essentially no change in the waterflood response at the North Fairview Unit during the last quarter. Oil production rates from the three producing wells have remained unchanged; that is, 3 stb/d for Smith 33-6, 2 stb/d for Perkins 33--11, and 1 stb/d for the Perkins Young 33--10 well.« less
Ramesh, A; Denzil, S B; Linda, R; Josephine, P K; Nagapoornima, M; Suman Rao, P N; Swarna Rekha, A
2013-03-01
To evaluate the efficacy of operant conditioning in sustaining reduced noise levels in the neonatal intensive care unit (NICU). Quasi-experimental study on quality of care. Level III NICU of a teaching hospital in south India. 26 staff employed in the NICU. (7 Doctors, 13 Nursing staff and 6 Nursing assistants). Operant conditioning of staff activity for 6 months. This method involves positive and negative reinforcement to condition the staff to modify noise generating activities. Comparing noise levels in decibel: A weighted [dB (A)] before conditioning with levels at 18 and 24 months after conditioning. Decibel: A weighted accounts for noise that is audible to human ears. Operant conditioning for 6 months sustains the reduced noise levels to within 62 dB in ventilator room 95% CI: 60.4 - 62.2 and isolation room (95% CI: 55.8 - 61.5). In the preterm room, noise can be maintained within 52 dB (95% CI: 50.8 - 52.6). This effect is statistically significant in all the rooms at 18 months (P = 0.001). At 24 months post conditioning there is a significant rebound of noise levels by 8.6, 6.7 and 9.9 dB in the ventilator, isolation and preterm room, respectively (P =0.001). Operant conditioning for 6 months was effective in sustaining reduced noise levels. At 18 months post conditioning, the noise levels were maintained within 62 dB (A), 60 dB (A) and 52 dB (A) in the ventilator, isolation and pre-term room, respectively. Conditioning needs to be repeated at 12 months in the ventilator room and at 18 months in the other rooms.
A space systems perspective of graphics simulation integration
NASA Technical Reports Server (NTRS)
Brown, R.; Gott, C.; Sabionski, G.; Bochsler, D.
1987-01-01
Creation of an interactive display environment can expose issues in system design and operation not apparent from nongraphics development approaches. Large amounts of information can be presented in a short period of time. Processes can be simulated and observed before committing resources. In addition, changes in the economics of computing have enabled broader graphics usage beyond traditional engineering and design into integrated telerobotics and Artificial Intelligence (AI) applications. The highly integrated nature of space operations often tend to rely upon visually intensive man-machine communication to ensure success. Graphics simulation activities at the Mission Planning and Analysis Division (MPAD) of NASA's Johnson Space Center are focusing on the evaluation of a wide variety of graphical analysis within the context of present and future space operations. Several telerobotics and AI applications studies utilizing graphical simulation are described. The presentation includes portions of videotape illustrating technology developments involving: (1) coordinated manned maneuvering unit and remote manipulator system operations, (2) a helmet mounted display system, and (3) an automated rendezous application utilizing expert system and voice input/output technology.
Gatowski, S I; Dobbin, S A; Richardson, J T; Ginsburg, G P
1997-01-01
A theoretical framework is proposed for understanding how the innovative use of behavioral science evidence is both produced and diffused among members of the global legal community. Using case law analyses and interviews with key individuals involved in selected cases, we examine how battered woman syndrome (BWS) is produced and diffused between and among Australia, Canada, England, and the United States. The following diffusion mechanisms are proposed: (1) The availability and accessibility of credible dissemination sources; (2) characteristics of the overall practice environment operating in each legal culture; (3) the attitudes and knowledge of attorneys and judges about the use of scientific evidence; (4) political and social support for the use of the evidence in the legal culture; and (5) the level of structural equivalence, communication, and "neighbor effects" between and among legal cultures. Each mechanism is discussed and supplemented with information from interviews with individuals involved in key cases involving BWS evidence.
40 CFR Table 30 to Subpart Uuu of... - Operating Limits for HAP Emissions From Sulfur Recovery Units
Code of Federal Regulations, 2011 CFR
2011-07-01
... Sulfur Recovery Units 30 Table 30 to Subpart UUU of Part 63 Protection of Environment ENVIRONMENTAL... Refineries: Catalytic Cracking Units, Catalytic Reforming Units, and Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 30 Table 30 to Subpart UUU of Part 63—Operating Limits for HAP Emissions From Sulfur Recovery...
Energy Efficiency Model for Induction Furnace
NASA Astrophysics Data System (ADS)
Dey, Asit Kr
2018-01-01
In this paper, a system of a solar induction furnace unit was design to find out a new solution for the existing AC power consuming heating process through Supervisory control and data acquisition system. This unit can be connected directly to the DC system without any internal conversion inside the device. The performance of the new system solution is compared with the existing one in terms of power consumption and losses. This work also investigated energy save, system improvement, process control model in a foundry induction furnace heating framework corresponding to PV solar power supply. The results are analysed for long run in terms of saving energy and integrated process system. The data acquisition system base solar foundry plant is an extremely multifaceted system that can be run over an almost innumerable range of operating conditions, each characterized by specific energy consumption. Determining ideal operating conditions is a key challenge that requires the involvement of the latest automation technologies, each one contributing to allow not only the acquisition, processing, storage, retrieval and visualization of data, but also the implementation of automatic control strategies that can expand the achievement envelope in terms of melting process, safety and energy efficiency.
Hot melt adhesive pad surface attachment assembly concept for on-orbit operations
NASA Technical Reports Server (NTRS)
Progar, D. J.; Stein, B. A.
1984-01-01
The use of a hot melt adhesive concept to develop a Surface Attachment Assembly (SAA) for on-orbit attachment and detachment operations for the Manned Maneuvering Unit (MMU) was investigated. The concept involved impregnation of the hot melt adhesive into a fiberglass covered pad which contained electrical heating and thermoelectric cooling devices. The polyamide hot melt adhesive selected can be repeatedly heated to its melting point in a vacuum and provide good adhesion to various surfaces, i.e., reusable surface insulation tiles, metals, and composites, when cooled. After a series of adhesive screening tests, Jet-Melt 3746 was selected from a group of commercially available thermoplastic adhesive candidates which met or exceeded many of the criteria established for the SAA system. The SAA system was designed and fabricted with the goal of proving the concept with a working model rather than attempting to optimize all facets of the system. This system evolved by investigating alternate attachment concepts, designing and fabricating electronic systems to heat and cool the adhesive, and then fabricating electronic systems to heat and cool the adhesive, and then fabricating and testing two prototype full-size units.
Extravehicular mobility unit subcritical liquid oxygen storage and supply system
NASA Technical Reports Server (NTRS)
Anderson, John; Martin, Timothy; Hodgson, ED
1992-01-01
The storage of life support oxygen in the Extravehicular Mobility Unit in the liquid state offers some advantages over the current method of storing the oxygen as a high pressure gas. Storage volume is reduced because of the increased density associated with liquid. The lower storage and operating pressures also reduce the potential for leakage or bursting of the storage tank. The potential for combustion resulting from adiabatic combustion of the gas within lines and components is substantially reduced. Design constraints on components are also relaxed due to the lower system pressures. A design study was performed to determine the requirements for a liquid storage system and prepare a conceptual design. The study involved four tasks. The first was to identify system operating requirements that influence or direct the design of the system. The second was to define candidate storage system concepts that could possibly satisfy the requirements. An evaluation and comparison of the candidate concepts was conducted in the third task. The fourth task was devoted to preparing a conceptual design of the recommended storage system and to evaluate concerns with integration of the concept into the EMU. The results are presented.
Implementation of ergonomics in a service unit: challenges and advances.
Penteado, Eliane Villas Bôas de Freitas; de França, Maria Goretti; Ramalhoto, Ana Maria de Brito; de Oliveira, Ana Maria; Machado, Bruno Rangel Cortoppassi; Genipapeiro, Joana Angélica Matos
2012-01-01
This article discusses the implementation of ergonomics in a service unit of a major company in the energy sector. From the perspective of management, it analyses the process of implementation of ergonomics programmes in four operational areas. The objective was to diagnose the level of implementation of ergonomics. The study is descriptive, undertaken through the interaction with the technical staff of the operational areas involved, incorporating the perception of these role players concerning their work routines. The results indicated significant differences in the level of implementation of the programmes, especially those concerning structural conditions. Important conquests were registered, such as the investment in the training of specialists, the establishment of a facilitator network and the improvement of the standard for the directioning and alignment of the execution of initiatives. The linking in of the programmes with those of occupational health management emphasises its contribution to the safety and well-being of the workforce through interventions aimed mainly at eliminating and reducing ergonomic biomechanical risks. However, the need to broaden and deepen the ergonomic approach regarding organizational and cognitive aspects, as well as the insertion of ergonomics in project design of new work spaces and processes were also identified.
Rabenhorst, Mandy M; McCarthy, Randy J; Thomsen, Cynthia J; Milner, Joel S; Travis, Wendy J; Colasanti, Marie P
2015-02-01
This study examined child maltreatment perpetration among 99,697 active-duty U.S. Air Force parents who completed a combat deployment. Using the deploying parent as the unit of analysis, we analyzed whether child maltreatment rates increased postdeployement relative to predeployment. These analyses extend previous research that used aggregate data and extend our previous work that used data from the same period but used the victim as the unit of analysis and included only deploying parents who engaged in child maltreatment. In this study, 2% (n = 1,746) of deploying parents perpetrated child maltreatment during the study period. Although no overall differences were found in child maltreatment rates postdeployment compared to predeployment, several maltreatment-related characteristics qualified this finding. Rates for emotional abuse and mild maltreatment were lower following deployment, whereas child maltreatment rates for severe maltreatment were higher following deployment. The finding that rates of severe child maltreatment, including incidents involving alcohol use, were higher postdeployment suggests a need for additional support services for parents following their return from combat deployment, with a focus on returning parents who have an alcohol use problem. © The Author(s) 2014.
An Analysis of the Autorotative Performance of a Helicopter Powered by Rotor-Tip Jet Units
NASA Technical Reports Server (NTRS)
Gessow, Alfred
1950-01-01
The autorotative performance of an assumed helicopter was studied to determine the effect of inoperative jet units located at the rotor-blade tip on the helicopter rate of descent. For a representative ramjet design, the effect of the jet drag is to increase the minimum rate of descent of the helicopter from about 1,OO feet per minute to 3,700 feet per minute when the rotor is operating at a tip speed of approximately 600 feet per second. The effect is less if the rotor operates at lower tip speeds, but the rotor kinetic energy and the stall margin available for the landing maneuver are then reduced. Power-off rates of descent of pulse-jet helicopters would be expected to be less than those of ramjet. helicopters because pulse jets of current design appear to have greater ratios of net power-on thrust to power-off, drag than currently designed rain jets. Iii order to obtain greater accuracy in studies of autorotative performance, calculations in'volving high power-off rates of descent should include the weight-supporting effect of the fuselage parasite-drag force and the fact that the rotor thrust does not equal the weight of the helicopter.
NASA Astrophysics Data System (ADS)
Howlader, Harun Or Rashid; Matayoshi, Hidehito; Noorzad, Ahmad Samim; Muarapaz, Cirio Celestino; Senjyu, Tomonobu
2018-05-01
This paper presents a smart house-based power system for thermal unit commitment programme. The proposed power system consists of smart houses, renewable energy plants and conventional thermal units. The transmission constraints are considered for the proposed system. The generated power of the large capacity renewable energy plant leads to the violated transmission constraints in the thermal unit commitment programme, therefore, the transmission constraint should be considered. This paper focuses on the optimal operation of the thermal units incorporated with controllable loads such as Electrical Vehicle and Heat Pump water heater of the smart houses. The proposed method is compared with the power flow in thermal units operation without controllable loads and the optimal operation without the transmission constraints. Simulation results show the validation of the proposed method.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-15
... Notice of Intent to Delete the soils of Operable Unit 1 and the underlying ground water of the... preclude future actions under Superfund. This partial deletion pertains to the soils of Operable Unit 1 and... Partial Deletion for the soils of Operable Unit 1 and the underlying ground water of the approximately 8...
29 CFR 779.310 - Employees of employers operating multi-unit businesses.
Code of Federal Regulations, 2010 CFR
2010-07-01
... multi-unit businesses. (a) Where the employer's business operations are conducted in more than one establishment, as in the various units of a chain-store system or where branch establishments are operated in conjunction with a main store, the employer is entitled to exemption under section 13(a)(2) or (4) for those...
29 CFR 779.310 - Employees of employers operating multi-unit businesses.
Code of Federal Regulations, 2012 CFR
2012-07-01
... multi-unit businesses. (a) Where the employer's business operations are conducted in more than one establishment, as in the various units of a chain-store system or where branch establishments are operated in conjunction with a main store, the employer is entitled to exemption under section 13(a)(2) or (4) for those...
29 CFR 779.310 - Employees of employers operating multi-unit businesses.
Code of Federal Regulations, 2011 CFR
2011-07-01
... multi-unit businesses. (a) Where the employer's business operations are conducted in more than one establishment, as in the various units of a chain-store system or where branch establishments are operated in conjunction with a main store, the employer is entitled to exemption under section 13(a)(2) or (4) for those...
42 CFR 447.206 - Cost limit for providers operated by units of government.
Code of Federal Regulations, 2010 CFR
2010-10-01
... section applies to payments made to health care providers that are operated by units of government as...) of the Act. (a) General rules. (1) All health care providers that are operated by units of government are limited to reimbursement not in excess of the individual health care provider's cost of providing...
Code of Federal Regulations, 2013 CFR
2013-07-01
... municipal waste combustion unit owners and operators in my State? 60.1545 Section 60.1545 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion... municipal waste combustion unit owners and operators in my State? (a) No, this subpart does not directly...
Code of Federal Regulations, 2014 CFR
2014-07-01
... municipal waste combustion unit owners and operators in my State? 60.1545 Section 60.1545 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion... municipal waste combustion unit owners and operators in my State? (a) No, this subpart does not directly...
Code of Federal Regulations, 2011 CFR
2011-07-01
... municipal waste combustion unit owners and operators in my State? 60.1545 Section 60.1545 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion... municipal waste combustion unit owners and operators in my State? (a) No, this subpart does not directly...
Code of Federal Regulations, 2012 CFR
2012-07-01
... municipal waste combustion unit owners and operators in my State? 60.1545 Section 60.1545 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion... municipal waste combustion unit owners and operators in my State? (a) No, this subpart does not directly...
Code of Federal Regulations, 2010 CFR
2010-07-01
... municipal waste combustion unit owners and operators in my State? 60.1545 Section 60.1545 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion... municipal waste combustion unit owners and operators in my State? (a) No, this subpart does not directly...
47 CFR 90.421 - Operation of mobile station units not under the control of the licensee.
Code of Federal Regulations, 2014 CFR
2014-10-01
... (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES PRIVATE LAND MOBILE RADIO SERVICES Operating Requirements § 90... unauthorized operation of such units not under its control. (a) Public Safety Pool. (1) Mobile units licensed in the Public Safety Pool may be installed in any vehicle which in an emergency would require...
Code of Federal Regulations, 2011 CFR
2011-07-01
... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...
Code of Federal Regulations, 2014 CFR
2014-07-01
... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...
Code of Federal Regulations, 2012 CFR
2012-07-01
... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...
Code of Federal Regulations, 2010 CFR
2010-07-01
... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...
Code of Federal Regulations, 2013 CFR
2013-07-01
... operation. A unit operation may have more than one batch emission episode per batch cycle. For example, a... shutdowns and during periods not associated with a shutdown. Examples of activities that can generate... management units such as an air flotation unit, clarifier, or biological treatment unit. Examples of an oil...
NASA Technical Reports Server (NTRS)
Jordan, Lee P.
2013-01-01
The Microgravity Science Glovebox (MSG) is a rack facility aboard the International Space Station (ISS) designed for investigation handling. The MSG was built by the European Space Agency (ESA) which also provides sustaining engineering support for the facility. The MSG has been operating on the ISS since July 2002 and is currently located in the US Laboratory Module. The unique design of the facility allows it to accommodate science and technology investigations in a "workbench" type environment. The facility has an enclosed working volume that is held at a negative pressure with respect to the crew living area. This allows the facility to provide two levels of containment for small parts, particulates, fluids, and gases. This containment approach protects the crew from possible hazardous operations that take place inside the MSG work volume. Research investigations operating inside the MSG are provided a large 255 liter enclosed work space, 1000 watts of dc power via a versatile supply interface (120, 28, +/- 12, and 5 Vdc), 1000 watts of cooling capability, video and data recording and real time downlink, ground commanding capabilities, access to ISS Vacuum Exhaust and Vacuum Resource Systems, and gaseous nitrogen supply. These capabilities make the MSG one of the most utilized facilities on ISS. The MSG has been used for over 14500 hours of scientific payload operations. MSG investigations involve research in cryogenic fluid management, fluid physics, spacecraft fire safety, materials science, combustion, plant growth, and life support technology. The MSG facility is operated by the Payloads Operations Integration Center at Marshall Space flight Center. Payloads may also operate remotely from different telescience centers located in the United States and Europe. The investigative Payload Integration Manager (iPIM) is the focal to assist organizations that have payloads operating in the MSG facility. NASA provides an MSG engineering unit for payload developers to verify that their hardware is operating properly before actual operation on the ISS. This paper will provide an overview of the MSG facility, a synopsis of the research that has already been accomplished in the MSG, and an overview of video and biological upgrades.
Kott, Matthias; Elke, Gunnar; Reinicke, Maike; Winoto-Morbach, Supandi; Schädler, Dirk; Zick, Günther; Frerichs, Inéz; Weiler, Norbert; Schütze, Stefan
2014-01-01
Acid sphingomyelinase is involved in lipid signalling pathways and regulation of apoptosis by the generation of ceramide and plays an important role during the host response to infectious stimuli. It thus has the potential to be used as a novel diagnostic marker in the management of critically ill patients. The objective of our study was to evaluate acid sphingomyelinase serum activity (ASM) as a diagnostic and prognostic marker in a mixed intensive care unit population before, during, and after systemic inflammation. 40 patients admitted to the intensive care unit at risk for developing systemic inflammation (defined as systemic inflammatory response syndrome plus a significant procalcitonin [PCT] increase) were included. ASM was analysed on ICU admission, before (PCT before), during (PCT peak) and after (PCT low) onset of SIRS. Patients undergoing elective surgery served as control (N = 8). Receiver-operating characteristics curves were computed. ASM significantly increased after surgery in the eight control patients. Patients from the intensive care unit had significantly higher ASM on admission than control patients after surgery. 19 out of 40 patients admitted to the intensive care unit developed systemic inflammation and 21 did not, with no differences in ASM between these two groups on admission. In patients with SIRS and PCT peak, ASM between admission and PCT before was not different, but further increased at PCT peak in non-survivors and was significantly higher at PCT low compared to survivors. Survivors exhibited decreased ASM at PCT peak and PCT low. Receiver operating curve analysis on discrimination of ICU mortality showed an area under the curve of 0.79 for ASM at PCT low. In summary, ASM was generally higher in patients admitted to the intensive care unit compared to patients undergoing uncomplicated surgery. ASM did not indicate onset of systemic inflammation. In contrast to PCT however, it remained high in non-surviving ICU patients after systemic inflammation.
Reinicke, Maike; Winoto-Morbach, Supandi; Schädler, Dirk; Zick, Günther; Frerichs, Inéz; Weiler, Norbert; Schütze, Stefan
2014-01-01
Introduction Acid sphingomyelinase is involved in lipid signalling pathways and regulation of apoptosis by the generation of ceramide and plays an important role during the host response to infectious stimuli. It thus has the potential to be used as a novel diagnostic marker in the management of critically ill patients. The objective of our study was to evaluate acid sphingomyelinase serum activity (ASM) as a diagnostic and prognostic marker in a mixed intensive care unit population before, during, and after systemic inflammation. Methods 40 patients admitted to the intensive care unit at risk for developing systemic inflammation (defined as systemic inflammatory response syndrome plus a significant procalcitonin [PCT] increase) were included. ASM was analysed on ICU admission, before (PCTbefore), during (PCTpeak) and after (PCTlow) onset of SIRS. Patients undergoing elective surgery served as control (N = 8). Receiver-operating characteristics curves were computed. Results ASM significantly increased after surgery in the eight control patients. Patients from the intensive care unit had significantly higher ASM on admission than control patients after surgery. 19 out of 40 patients admitted to the intensive care unit developed systemic inflammation and 21 did not, with no differences in ASM between these two groups on admission. In patients with SIRS and PCT peak, ASM between admission and PCTbefore was not different, but further increased at PCTpeak in non-survivors and was significantly higher at PCTlow compared to survivors. Survivors exhibited decreased ASM at PCTpeak and PCTlow. Receiver operating curve analysis on discrimination of ICU mortality showed an area under the curve of 0.79 for ASM at PCTlow. Conclusions In summary, ASM was generally higher in patients admitted to the intensive care unit compared to patients undergoing uncomplicated surgery. ASM did not indicate onset of systemic inflammation. In contrast to PCT however, it remained high in non-surviving ICU patients after systemic inflammation. PMID:25384060
Cheung, Cecilia Sin-Sze; Pomerantz, Eva M.
2011-01-01
This research examined parents' involvement in children's learning in the United States and China. Beginning in seventh grade, 825 American and Chinese children (mean age = 12.74 years) reported on their parents' involvement in their learning as well as their parents' psychological control and autonomy support every six months until the end of eighth grade. Information on children's academic and emotional adjustment was obtained. American (vs. Chinese) parents' involvement was associated less with their control and more with their autonomy support. Despite these different associations, parents' heightened involvement predicted children's enhanced engagement and achievement similarly in the United States and China. However, it predicted enhanced perceptions of competence and positive emotional functioning more strongly in the United States than China. PMID:21418057
2017-05-25
Research Question What lessons can the contemporary Marine Corps learn from its transition from the post - Cold War and Operation Desert Shield and...United States Marine Corps Post -Cold War Evolutionary Efforts: Implications for a Post -Operation Enduring Freedom/Operation Iraqi Freedom...
40 CFR 60.5130 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines... operated unless a fully trained and qualified SSI unit operator is accessible, either at the facility or can be at the facility within 1 hour. The trained and qualified SSI unit operator may operate the SSI...
40 CFR 60.2070 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of... operated unless a fully trained and qualified CISWI unit operator is accessible, either at the facility or can be at the facility within 1 hour. The trained and qualified CISWI unit operator may operate the...
40 CFR 60.2070 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2013 CFR
2013-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Standards of... operated unless a fully trained and qualified CISWI unit operator is accessible, either at the facility or can be at the facility within 1 hour. The trained and qualified CISWI unit operator may operate the...
40 CFR 60.5130 - What are the operator training and qualification requirements?
Code of Federal Regulations, 2014 CFR
2014-07-01
... (CONTINUED) AIR PROGRAMS (CONTINUED) STANDARDS OF PERFORMANCE FOR NEW STATIONARY SOURCES Emission Guidelines... operated unless a fully trained and qualified SSI unit operator is accessible, either at the facility or can be at the facility within 1 hour. The trained and qualified SSI unit operator may operate the SSI...
ERIC Educational Resources Information Center
Barnes, Gail V.; DeFreitas, Aureo; Grego, John
2016-01-01
The purpose of this study was to determine whether individuals' perceptions of parental involvement and home environment in music vary with nationality (Brazil/United States) and time frame (past/current). Past and current students from selected community music programs in the United States and Brazil completed the PI-HEM (Parental Involvement and…
NASA Technical Reports Server (NTRS)
Engel, Jerome N.; Copp, Martin R.
1959-01-01
Acceleration, airspeed, and altitude data obtained with an NACA VGH recorder from a four-engine commercial transport airplane operating over a northwestern United States-Alaska route were evaluated to determine the magnitude and frequency of occurrence of gust and maneuver accelerations., operating airspeeds, and gust velocities. The results obtained were then compared with the results previously reported in NACA Technical Note 3475 for two similar airplanes operating over transcontinental routes in the United States. No large variations in the gust experience for the three operations were noted. The results indicate that the gust-load experience of the present operation closely approximated that of the central transcontinental route in the United States with which it is compared and showed differences of about 4 to 1 when compared with that of the southern transcontinental route in the United States. In general, accelerations due to gusts occurred much more frequently than those due to operational maneuvers. At a measured normal-acceleration increment of 0.5g, accelerations due to gusts occurred roughly 35 times more frequently than those due to operational maneuvers.
7 CFR 631.22 - Access to operating unit.
Code of Federal Regulations, 2010 CFR
2010-01-01
... include the right to measure acreages, render technical assistance, and inspect any work undertaken under... Access to operating unit. Any authorized NRCS representative shall have the right to enter an operating...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-01-01
This bill would amend the Federal Water Pollution Control Act to empower the President to determine areas for which a oil or hazardous material discharge contingency plan is necessary and to require terminal operators, vessel operators, and other parties directly involved in the transport of oil or hazardous materials to prepare a contingency plan and to submit this plan for approval to the President on a periodic basis. In the event of a discharge, the President is responsible for seeing that the removal plan is implemented and for requiring any changes as he may determine to be necessary. The Presidentmore » can deny entry to any port to any vessel or deny movement of substances through any terminal facility, if the vessel or facility operators do not have a current and approved contingency plan in effect.« less
Johnson, Ralph J
2015-01-01
Post-Cold War United Nations Peace Keeping Operations (UN PKOs) have been increasingly involved in dangerous areas with ill-defined boundaries, harsh and remote geographies, simmering internecine armed conflict, and disregard on the part of some local parties for peacekeepers' security and role. In the interest of force protection and optimizing operations, a key component of UN PKOs is healthcare and medical treatment. The expectation is that UN PKO medical support will adjust to the general intent and structure of UN PKOs. To do so requires effective policies and planning informed by a review of all medical aspects of UN PKO operations, including those considered supplementary, that is, less crucial but contributing nonetheless. Medical aspects considered paramount and key to UN PKOs have received relatively thorough treatment elsewhere. The intent of this article is to report on ancillary and supplemental medical aspects practical to post-Cold War UN PKO operations assembled through an iterative inquiry of open-source articles. Recommendations are made about possible courses of action in terms of addressing trends found in such medical aspects of PKOs and relevance of US/NATO/European Union models and research.
Liver injuries in children: the role of selective non-operative management.
Nouira, Faouzi; Kerkeni, Yosra; Ben Amor, Anissa; Ben Ahmed, Yosra; Charieg, Aouatef; Khemakhem, Rachid; Ghorbel, Soufiane; Jlidi, Said; Ben Kahlifa, Sonia; Chaouachi, Beji
2012-02-01
Trauma remains the leading cause of mortality in the pediatric population. Liver injuries occur commonly in blunt abdominal trauma. To assess the selective non-operative management of liver injuries in children. A retrospective review of 51 patients with a discharge diagnosis of traumatic liver injuries at Tunis Children's Hospital, over a 14-year period from 1996 to 2009. We identified 51 patients with liver trauma. The median age was 7 years. Boys accounted for 58% (n= 30), and the most common cause was traffic accident. Head injuries were the most common associated injuries. Forty-nine patients (96%) required non-operative management without complications. The mean in-hospital stay was 10 days in this group. The ultrasound demonstrated complete resolution and healing after 3-6 months. Two patients underwent surgery for hemodynamic instability. The mortality rate was 0.2 %. Safe, non-operative management involves careful serial examination, a CT scanning facility and close monitoring of the patient in a fully equipped high-dependency unit with trained staff to run it. Even though most patients can be treated non-operatively the challenge is to identify the severely injured child early and institute aggressive resuscitation and expedite laparotomy.
The Oak Ridge Reservation Annual Site Environmental Report, 2007
DOE Office of Scientific and Technical Information (OSTI.GOV)
Hughes, Joan; Thompson, Sharon; Page, David
2008-09-30
The Oak Ridge Reservation (ORR) consists of three major government-owned, contractor-operated facilities: the Y-12 National Security Complex, Oak Ridge National Laboratory, and East Tennessee Technology Park. The ORR was established in the early 1940s as part of the Manhattan Project, a secret undertaking that produced materials for the first atomic bombs. The reservation’s role has evolved over the years, and it continues to adapt to meet the changing defense, energy, and research needs of the United States. Both the work carried out for the war effort and subsequent research, development, and production activities have involved, and continue to involve, themore » use of radiological and hazardous materials. The Oak Ridge Reservation Annual Site Environmental Report and supporting data are available at Http://www.ornl.gov/sci/env_rpt or from the project director.« less
VINCI: the VLT Interferometer commissioning instrument
NASA Astrophysics Data System (ADS)
Kervella, Pierre; Coudé du Foresto, Vincent; Glindemann, Andreas; Hofmann, Reiner
2000-07-01
The Very Large Telescope Interferometer (VLTI) is a complex system, made of a large number of separated elements. To prepare an early successful operation, it will require a period of extensive testing and verification to ensure that the many devices involved work properly together, and can produce meaningful data. This paper describes the concept chosen for the VLTI commissioning instrument, LEONARDO da VINCI, and details its functionalities. It is a fiber based two-way beam combiner, associated with an artificial star and an alignment verification unit. The technical commissioning of the VLTI is foreseen as a stepwise process: fringes will first be obtained with the commissioning instrument in an autonomous mode (no other parts of the VLTI involved); then the VLTI telescopes and optical trains will be tested in autocollimation; finally fringes will be observed on the sky.
Randmaa, Maria; Swenne, Christine L; Mårtensson, Gunilla; Högberg, Hans; Engström, Maria
2016-03-01
Communication errors cause clinical incidents and adverse events in relation to surgery. To ensure proper postoperative patient care, it is essential that personnel remember and recall information given during the handover from the operating theatre to the postanaesthesia care unit. Formalizing the handover may improve communication and aid memory, but research in this area is lacking. The objective of this study was to evaluate whether implementing the communication tool Situation-Background-Assessment-Recommendation (SBAR) affects receivers' information retention after postoperative handover. A prospective intervention study with an intervention group and comparison nonintervention group, with assessments before and after the intervention. The postanaesthesia care units of two hospitals in Sweden during 2011 and 2012. Staff involved in the handover between the operating theatre and the postanaesthesia care units within each hospital. Implementation of the communication tool SBAR in one hospital. The main outcome was the percentage of recalled information sequences among receivers after the handover. Data were collected using both audio-recordings and observations recorded on a study-specific protocol form. Preintervention, 73 handovers were observed (intervention group, n = 40; comparison group, n = 33) involving 72 personnel (intervention group, n = 40; comparison group, n = 32). Postintervention, 91 handovers were observed (intervention group, n = 44; comparison group, n = 47) involving 57 personnel (intervention group, n = 31; comparison group, n = 26). In the intervention group, the percentage of recalled information sequences by the receivers increased from 43.4% preintervention to 52.6% postintervention (P = 0.004) and the SBAR structure improved significantly (P = 0.028). In the comparison group, the corresponding figures were 51.3 and 52.6% (P = 0.725) with no difference in SBAR structure. When a linear regression generalised estimating equation model was used to account for confounding influences, we were unable to show a significant difference in the information recalled between the intervention group and the nonintervention group over time. Compared with the comparison group with no intervention, when SBAR was implemented in an anaesthetic clinic, we were unable to show any improvement in recalled information among receivers following postoperative handover. Current controlled trials http://www.controlled-trials.com Identifier: ISRCTN37251313.
Report to Congress on abnormal occurrences, October--December 1994. Volume 17, No. 4
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
Section 208 of the Energy Reorganization Act of 1974 identifies an abnormal occurrence (AO) as an unscheduled incident or event that the Nuclear Regulatory Commission determines to be significant from the standpoint of public health or safety and requires a quarterly report of such occurrences to be made to Congress. This report provides a description of those incidents and events that have been determined to be AOs during the period of October 1 through December 31, 1994. This report addresses four AOs at NRC-licensed facilities. These occurrences involved the following: a generic concern relating to core shroud cracking in boilingmore » water reactors; recurring incidents of administering higher doses than procedurally allowed for diagnostic imaging at a single facility; one medical teletherapy misadministration; and one medical brachytherapy misadministration. Agreement States submitted four AO reports. These four occurrences involved the following: one major contamination at a commercial facility; two medical brachytherapy misadministrations; and one medical teletherapy misadministration. The report also contains updates of seven AOs previously reported by NRC licensees and four AOs previously reported by the Agreement States. Two ``Other Events of Interest`` are also being reported. These occurrences involved the operability of safety relief valves at a nuclear power plant, and an error in the installation process of a Leksell Gamma KnifeR teletherapy unit that resulted in an operational failure.« less
Scott, J S
1989-10-01
The federal Racketeer influenced and Corrupt Organizations Act (RICO) was enacted in 1970 to combat the infiltration of organized crime into legitimate businesses operating in interstate commerce. During the first 10 years of its existence, the statute was applied almost exclusively in charges requiring criminal penalties. Section 1964 of RICO, however, allows civil remedies for injuries resulting from certain defined criminal activities. These civil remedies authorize treble damages and a reasonable attorney's fee. The Supreme Court has upheld the extension of this law to apply to general business activities, including hospitals. Hospitals risk involvement in civil RICO litigation as they become increasingly active in alternative healthcare businesses--medical supply operations real estate ventures, etc.--that involve public participation and the sale of securities, partnership units, and other equity interests. A disgruntled investor in a failed venture may initiate litigation. Other areas where hospitals are vulnerable to RICO claims include medical staff grievances, involvement in health maintenance organizations, and profile protest activities. The RICO civil provisions contain five basic elements: injury, person, enterprise, pattern of racketeering activity, and interstate or foreign commerce. Basically, this means that any person injured by the unlawful conduct of a person who is employed by or associated with any enterprise that engages in a pattern of activity which affects interstate commerce is entitled to civil RICO damages.
40 CFR 69.11 - New exemptions.
Code of Federal Regulations, 2014 CFR
2014-07-01
... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...
40 CFR 69.11 - New exemptions.
Code of Federal Regulations, 2012 CFR
2012-07-01
... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...
40 CFR 69.11 - New exemptions.
Code of Federal Regulations, 2013 CFR
2013-07-01
... significant deterioration (“PSD”) permit prior to construction is granted for the electric generating units... not be operated until a final PSD permit is issued for that unit; (ii) Each electric generating unit shall not be operated until that unit complies with all requirements of its PSD permit, including, if...
Staid, Andrea; Watson, Jean -Paul; Wets, Roger J. -B.; ...
2017-07-11
Forecasts of available wind power are critical in key electric power systems operations planning problems, including economic dispatch and unit commitment. Such forecasts are necessarily uncertain, limiting the reliability and cost effectiveness of operations planning models based on a single deterministic or “point” forecast. A common approach to address this limitation involves the use of a number of probabilistic scenarios, each specifying a possible trajectory of wind power production, with associated probability. We present and analyze a novel method for generating probabilistic wind power scenarios, leveraging available historical information in the form of forecasted and corresponding observed wind power timemore » series. We estimate non-parametric forecast error densities, specifically using epi-spline basis functions, allowing us to capture the skewed and non-parametric nature of error densities observed in real-world data. We then describe a method to generate probabilistic scenarios from these basis functions that allows users to control for the degree to which extreme errors are captured.We compare the performance of our approach to the current state-of-the-art considering publicly available data associated with the Bonneville Power Administration, analyzing aggregate production of a number of wind farms over a large geographic region. Finally, we discuss the advantages of our approach in the context of specific power systems operations planning problems: stochastic unit commitment and economic dispatch. Here, our methodology is embodied in the joint Sandia – University of California Davis Prescient software package for assessing and analyzing stochastic operations strategies.« less
Clinical track faculty: merits and issues.
Lee, Won-Hee; Kim, Cho Ja; Roh, Young Sook; Shin, Hyunsook; Kim, Mi Ja
2007-01-01
Clinical track faculty (CTF) has been in operation for more than two decades in the United States, and 12 of the top 20 schools of nursing with the highest National Institutes of Health funding in the United States have CTF in place. Yet, only limited articles have been published regarding the merits and issues related to its operation. This article examines the advantages/merits of establishing CTF in schools of nursing, discusses the qualification criteria and types of appointment for CTF, and analyzes issues related to operating CTF in Korea. A questionnaire survey and two workshops were conducted involving faculty from a college of nursing and clinical nurse managers from university-affiliated medical centers and community agencies. Most of the respondents indicated that establishing CTF was advantageous. Merits included the following: increasing reality-based clinical education and training; decreasing the reality shock of students; increasing student satisfaction; and linking education, practice, and research more effectively. Major issues were as follows: getting the approval of medical centers/universities; developing an agreement on CTF operation between the college of nursing and clinical agencies; clarifying types and criteria of appointment and promotion; and developing a statement on role and compensation policies. Most issues are similar to what U.S. schools of nursing have faced, except for the first one. In conclusion, establishing CTF in Korea appears to be highly desirable. Merits outweigh issues/concerns, and Korean nursing schools may look for an opportune time for obtaining the approval of medical centers/universities. Nursing schools in other countries that face a similar challenge of providing clinical teaching with high research performance may consider instituting CTF.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Staid, Andrea; Watson, Jean -Paul; Wets, Roger J. -B.
Forecasts of available wind power are critical in key electric power systems operations planning problems, including economic dispatch and unit commitment. Such forecasts are necessarily uncertain, limiting the reliability and cost effectiveness of operations planning models based on a single deterministic or “point” forecast. A common approach to address this limitation involves the use of a number of probabilistic scenarios, each specifying a possible trajectory of wind power production, with associated probability. We present and analyze a novel method for generating probabilistic wind power scenarios, leveraging available historical information in the form of forecasted and corresponding observed wind power timemore » series. We estimate non-parametric forecast error densities, specifically using epi-spline basis functions, allowing us to capture the skewed and non-parametric nature of error densities observed in real-world data. We then describe a method to generate probabilistic scenarios from these basis functions that allows users to control for the degree to which extreme errors are captured.We compare the performance of our approach to the current state-of-the-art considering publicly available data associated with the Bonneville Power Administration, analyzing aggregate production of a number of wind farms over a large geographic region. Finally, we discuss the advantages of our approach in the context of specific power systems operations planning problems: stochastic unit commitment and economic dispatch. Here, our methodology is embodied in the joint Sandia – University of California Davis Prescient software package for assessing and analyzing stochastic operations strategies.« less
Experimental Validation of a Closed Brayton Cycle System Transient Simulation
NASA Technical Reports Server (NTRS)
Johnson, Paul K.; Hervol, David S.
2006-01-01
The Brayton Power Conversion Unit (BPCU) located at NASA Glenn Research Center (GRC) in Cleveland, Ohio was used to validate the results of a computational code known as Closed Cycle System Simulation (CCSS). Conversion system thermal transient behavior was the focus of this validation. The BPCU was operated at various steady state points and then subjected to transient changes involving shaft rotational speed and thermal energy input. These conditions were then duplicated in CCSS. Validation of the CCSS BPCU model provides confidence in developing future Brayton power system performance predictions, and helps to guide high power Brayton technology development.
Fuzzy logic assisted control of inspired oxygen in ventilated newborn infants.
Sun, Y.; Kohane, I.; Stark, A. R.
1994-01-01
The control of oxygen delivery to mechanically ventilated newborn infants is a time intensive process that must balance adequate tissue oxygenation against possible toxic effects of oxygen exposure. Investigation in computer assisted control of mechanical ventilation is increasing, although very few studies involve newborn infants. We have implemented a fuzzy controller for the adjustment of inspired oxygen concentration (FIO2) in ventilated newborns. The controller utilizes rules produced by neonatologists, and operates in real-time. A clinical trial of this controller is currently taking place in the neonatal intensive care unit (NICU) of Children's Hospital, Boston, MA. PMID:7950026
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1989-01-01
S. 1626 is a bill to establish within the Office of Minority Economic Impact of the Department of Energy (DOE) programs involving loans and grants to enhance the development and operation of minority business enterprises with respect to energy-related business, to amend the Nuclear Waste Policy Act of 1982 to permit the investment of certain funds in the Minority Bank Deposit Program of the Department of the Treasury, and for other purposes.
The role of health economics in the evaluation of surgery and operative technologies.
Taylor, Matthew
2017-02-01
Dr Matthew Taylor is the director of York Health Economics Consortium and leads the Consortium's health technology assessment program. The work of York Health Economics Consortium involves empirical research in health economics for both the private and public sectors. Dr Taylor is the scientific lead for the National Institute for Health and Care Excellence (NICE) Economic and Methodological Unit and a former member of NICE's Public Health Advisory Committee. He is also managing director (Europe) of Minerva, an international network of health economics consultancies. Copyright © 2016 Elsevier Inc. All rights reserved.
Solar-A Prelaunch Mission Operation Report (MOR)
NASA Technical Reports Server (NTRS)
1991-01-01
The Solar-A mission is a Japanese-led program with the participation of the United States and the United Kingdom. The Japanese Institute of Space and Astronautical Science (ISAS) is providing the Solar-A spacecraft, two of the four science instruments, the launch vehicle and launch support, and the principal ground station with Operational Control Center. NASA is providing a science instrument, the Soft X-ray Telescope (SXT)and tracking support using the Deep Space Network (DSN) ground stations. The United Kingdom s Science and Engineering Research Council (SERC) provides the Bragg Crystal Spectrometer. The Solar-A mission will study solar flares using a cluster of instruments on a satellite in a 600 km altitude, 31 degree inclination circular orbit. The emphasis of the mission is on imaging and spectroscopy of hard and soft X-rays. The principal instruments are a pair of X-ray imaging instruments, one for the hard X-ray range and one for the soft X-ray range. The Hard X-Ray Telescope (HXT), provided by ISAS, operates in the energy range of 10-100 keV and uses an array of modulation collimators to record Fourier transform images of the non-thermal and hot plasmas that are formed during the early phases of a flare. These images are thought to be intimately associated with the sites of primary energy release. The Soft X-Ray Telescope (SXT), jointly provided by NASA and ISAS, operates in the wavelength range of 3-50 Angstroms and uses a grazing incidence mirror to form direct images of the lower temperature (but still very hot) plasmas that form as the solar atmosphere responds to the injection of energy. The SXT instrument is a joint development effort between the Lockheed Palo Alto Research Laboratory and the National Astronomical Observatory of Japan. The U.S. effort also involves Stanford University, the University of California at Berkeley and the University of Hawaii, who provide support in the areas of theory, data analysis and interpretation, and ground-based observations. The hard and soft X-ray telescopes both have an alignment sensor, operating in the visual region of the spectrum, to provide co-alignment information.
NASA Technical Reports Server (NTRS)
Mielke, Roland V. (Inventor); Stoughton, John W. (Inventor)
1990-01-01
Computationally complex primitive operations of an algorithm are executed concurrently in a plurality of functional units under the control of an assignment manager. The algorithm is preferably defined as a computationally marked graph contianing data status edges (paths) corresponding to each of the data flow edges. The assignment manager assigns primitive operations to the functional units and monitors completion of the primitive operations to determine data availability using the computational marked graph of the algorithm. All data accessing of the primitive operations is performed by the functional units independently of the assignment manager.
Code of Federal Regulations, 2012 CFR
2012-10-01
... requirements in connection with the creation and operation of a unit agreement? 3280.5 Section 3280.5 Public... with the creation and operation of a unit agreement? (a) BLM may, with the consent of the lessees... connection with the creation and operation of any such unit agreement as BLM may consider necessary or...
Code of Federal Regulations, 2013 CFR
2013-10-01
... requirements in connection with the creation and operation of a unit agreement? 3280.5 Section 3280.5 Public... with the creation and operation of a unit agreement? (a) BLM may, with the consent of the lessees... connection with the creation and operation of any such unit agreement as BLM may consider necessary or...
Code of Federal Regulations, 2011 CFR
2011-10-01
... requirements in connection with the creation and operation of a unit agreement? 3280.5 Section 3280.5 Public... with the creation and operation of a unit agreement? (a) BLM may, with the consent of the lessees... connection with the creation and operation of any such unit agreement as BLM may consider necessary or...
Code of Federal Regulations, 2014 CFR
2014-10-01
... requirements in connection with the creation and operation of a unit agreement? 3280.5 Section 3280.5 Public... with the creation and operation of a unit agreement? (a) BLM may, with the consent of the lessees... connection with the creation and operation of any such unit agreement as BLM may consider necessary or...
40 CFR 97.71 - Initial certification and recertification procedures.
Code of Federal Regulations, 2013 CFR
2013-07-01
... operator of a NOX Budget unit that is subject to an Acid Rain emissions limitation shall comply with the... section. (b) The owner or operator of a NOX Budget unit that is not subject to an Acid Rain emissions...) of this section. The owner or operator of a NOX Budget unit that is subject to an Acid Rain emissions...
40 CFR 97.71 - Initial certification and recertification procedures.
Code of Federal Regulations, 2014 CFR
2014-07-01
... operator of a NOX Budget unit that is subject to an Acid Rain emissions limitation shall comply with the... section. (b) The owner or operator of a NOX Budget unit that is not subject to an Acid Rain emissions...) of this section. The owner or operator of a NOX Budget unit that is subject to an Acid Rain emissions...
40 CFR 97.71 - Initial certification and recertification procedures.
Code of Federal Regulations, 2012 CFR
2012-07-01
... operator of a NOX Budget unit that is subject to an Acid Rain emissions limitation shall comply with the... section. (b) The owner or operator of a NOX Budget unit that is not subject to an Acid Rain emissions...) of this section. The owner or operator of a NOX Budget unit that is subject to an Acid Rain emissions...
40 CFR Table 30 to Subpart Uuu of... - Operating Limits for HAP Emissions From Sulfur Recovery Units
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Operating Limits for HAP Emissions From Sulfur Recovery Units 30 Table 30 to Subpart UUU of Part 63 Protection of Environment... Units Pt. 63, Subpt. UUU, Table 30 Table 30 to Subpart UUU of Part 63—Operating Limits for HAP Emissions...
40 CFR Table 30 to Subpart Uuu of... - Operating Limits for HAP Emissions From Sulfur Recovery Units
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Operating Limits for HAP Emissions From Sulfur Recovery Units 30 Table 30 to Subpart UUU of Part 63 Protection of Environment... Units Pt. 63, Subpt. UUU, Table 30 Table 30 to Subpart UUU of Part 63—Operating Limits for HAP Emissions...
77 FR 65417 - Compliance With Information Request, Flooding Hazard Reevaluation
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-26
... operating units, however, the first large tsunami wave inundated the site, followed by additional waves. The... units. Unit 6 retained the function of one air-cooled EDG; Despite their actions, the operators lost the...
Do burn centers provide juvenile firesetter intervention?
Ahrns-Klas, Karla S; Wahl, Wendy L; Hemmila, Mark R; Wang, Stewart C
2012-01-01
Juvenile firesetting activity accounts for a significant number of annual injuries and property damage, yet there is sparse information on intervention in the burn literature. To quantify juvenile firesetting intervention (JFSI) in burn centers, a 23-question survey was sent to all directors listed in the American Burn Association Burn Care Facilities Directory.Sixty-four out of 112 (57%) surveys were returned. This represents responses from 79% of currently verified burn centers. When queried on interventions provided to a juvenile firesetter admitted to their unit, 38% report having their own JFSI program and 38% refer the child to fire services. Two thirds of units without a JFSI program treat pediatric patients. Units that previously had a JFSI program report lack of staffing and funding as most common reasons for program discontinuation. Almost all (95%) stated that a visual tool demonstrating legal, financial, social, future, and career ramifications associated with juvenile firesetting would be beneficial to their unit. Many burn units that treat pediatric patients do not have JFSI and rely on external programs operated by fire services. Existing JFSI programs vary greatly in structure and method of delivery. Burn centers should be involved in JFSI, and most units would benefit from a new video toolkit to assist in providing appropriate JFSI. Study results highlight a need for burn centers to collaborate on evaluating effectiveness of JFSI programs and providing consistent intervention materials based on outcomes research.
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-04-28
This health and safety plan sets forth the requirements and procedures to protect the personnel involved in the Lead Source Removal Project at the Former YS-86O Firing Ranges. This project will be conducted in a manner that ensures the protection of the safety and health of workers, the public, and the environment. The purpose of this removal action is to address lead contaminated soil and reduce a potential risk to human health and the environment. This site is an operable unit within the Upper East Fork Poplar Creek watershed. The removal action will contribute to early source actions within themore » watershed. The project will accomplish this through the removal of lead-contaminated soil in the target areas of the two small arms firing ranges. This plan covers the removal actions at the Former YS-86O Firing Ranges. These actions involve the excavation of lead-contaminated soils, the removal of the concrete trench and macadam (asphalt) paths, verification/confirmation sampling, grading and revegetation. The primary hazards include temperature extremes, equipment operation, noise, potential lead exposure, uneven and slippery working surfaces, and insects.« less
Enhanced perception in savant syndrome: patterns, structure and creativity
Mottron, Laurent; Dawson, Michelle; Soulières, Isabelle
2009-01-01
According to the enhanced perceptual functioning (EPF) model, autistic perception is characterized by: enhanced low-level operations; locally oriented processing as a default setting; greater activation of perceptual areas during a range of visuospatial, language, working memory or reasoning tasks; autonomy towards higher processes; and superior involvement in intelligence. EPF has been useful in accounting for autistic relative peaks of ability in the visual and auditory modalities. However, the role played by atypical perceptual mechanisms in the emergence and character of savant abilities remains underdeveloped. We now propose that enhanced detection of patterns, including similarity within and among patterns, is one of the mechanisms responsible for operations on human codes, a type of material with which savants show particular facility. This mechanism would favour an orientation towards material possessing the highest level of internal structure, through the implicit detection of within- and between-code isomorphisms. A second mechanism, related to but exceeding the existing concept of redintegration, involves completion, or filling-in, of missing information in memorized or perceived units or structures. In the context of autistics' enhanced perception, the nature and extent of these two mechanisms, and their possible contribution to the creativity evident in savant performance, are explored. PMID:19528021
Enhanced perception in savant syndrome: patterns, structure and creativity.
Mottron, Laurent; Dawson, Michelle; Soulières, Isabelle
2009-05-27
According to the enhanced perceptual functioning (EPF) model, autistic perception is characterized by: enhanced low-level operations; locally oriented processing as a default setting; greater activation of perceptual areas during a range of visuospatial, language, working memory or reasoning tasks; autonomy towards higher processes; and superior involvement in intelligence. EPF has been useful in accounting for autistic relative peaks of ability in the visual and auditory modalities. However, the role played by atypical perceptual mechanisms in the emergence and character of savant abilities remains underdeveloped. We now propose that enhanced detection of patterns, including similarity within and among patterns, is one of the mechanisms responsible for operations on human codes, a type of material with which savants show particular facility. This mechanism would favour an orientation towards material possessing the highest level of internal structure, through the implicit detection of within- and between-code isomorphisms. A second mechanism, related to but exceeding the existing concept of redintegration, involves completion, or filling-in, of missing information in memorized or perceived units or structures. In the context of autistics' enhanced perception, the nature and extent of these two mechanisms, and their possible contribution to the creativity evident in savant performance, are explored.
A Compact VLSI System for Bio-Inspired Visual Motion Estimation.
Shi, Cong; Luo, Gang
2018-04-01
This paper proposes a bio-inspired visual motion estimation algorithm based on motion energy, along with its compact very-large-scale integration (VLSI) architecture using low-cost embedded systems. The algorithm mimics motion perception functions of retina, V1, and MT neurons in a primate visual system. It involves operations of ternary edge extraction, spatiotemporal filtering, motion energy extraction, and velocity integration. Moreover, we propose the concept of confidence map to indicate the reliability of estimation results on each probing location. Our algorithm involves only additions and multiplications during runtime, which is suitable for low-cost hardware implementation. The proposed VLSI architecture employs multiple (frame, pixel, and operation) levels of pipeline and massively parallel processing arrays to boost the system performance. The array unit circuits are optimized to minimize hardware resource consumption. We have prototyped the proposed architecture on a low-cost field-programmable gate array platform (Zynq 7020) running at 53-MHz clock frequency. It achieved 30-frame/s real-time performance for velocity estimation on 160 × 120 probing locations. A comprehensive evaluation experiment showed that the estimated velocity by our prototype has relatively small errors (average endpoint error < 0.5 pixel and angular error < 10°) for most motion cases.
Hamman, William R; Beaudin-Seiler, Beth M; Beaubien, Jeffrey M; Gullickson, Amy M; Orizondo-Korotko, Krystyna; Gross, Amy C; Fuqua, Wayne; Lammers, Richard
2010-01-01
Since the publication of "To Err Is Human" in 1999, health care professionals have looked to high-reliability industries such as aviation for guidance on improving system safety. One of the most widely adopted aviation-derived approaches is simulation-based team training, also known as crew resource management training. In the health care domain, crew resource management training often takes place in custom-built simulation laboratories that are designed to replicate operating rooms or labor and delivery rooms. Unlike these traditional crew resource management training programs, "in situ simulation" occurs on actual patient care units, involves actual health care team members, and uses actual organization processes to train and assess team performance. During the past 24 months, our research team has conducted nearly 40 in situ simulations. In this article, we present the results from 1 such simulation: a patient who experienced a difficult labor that resulted in an emergency caesarian section and hysterectomy. During the simulation, a number of latent environmental threats to safety were identified. This article presents the latent threats and the steps that the hospital has taken to remedy them.
78 FR 35989 - Tennessee Valley Authority; Watts Bar Nuclear Plant, Unit 2
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-14
... Bar Nuclear Plant, Unit 2 AGENCY: Nuclear Regulatory Commission. ACTION: Final environmental statement... Operation of Watts Bar Nuclear Plant (WBN), Unit 2'' (SFES). ADDRESSES: Please refer to Docket ID NRC-2008... option of issuing the operating license for Watts Bar Nuclear Plant, Unit 2. This recommendation is based...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1994-06-01
The U.S. Department of Energy, Nevada Operations Office (DOE/NV), Completion Report provides a summary of activities conducted at the Nevada Test Site (NTS) between October 1, 1992, and September 30, 1993, associated with Operation KLAXON. (In the past, each annual Completion Report dealt with a series of underground nuclear detonations; however, because no nuclear tests were conducted during FY 1993, this Report summarizes continuing nonnuclear and nuclear test readiness activities at the NTS sponsored by DOE/NV.) The report serves as a reference for those involved with the planning and execution of Operation KLAXON and also serves as a planning guidemore » for future operations. Information in the report covers the logistics and management of activities. Scientific information and data associated with NTS activities are presented in technical documents published by participating agencies. In September 1992, Congress legislated a nine-month moratorium on the testing of nuclear weapons. The bill also provided for a resumption of testing (with no more than five tests per year, or a total of 15 during the next three years) in July 1993, and mandated an end to nuclear testing, entirely, by 1996. President Bush signed the bill into law in October 1992.« less
Experience with 850-MW fossil-fired units in peaking service
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dixon, B.G.
1978-01-01
Experience with the peaking operation of two 850-MW gross generation units at the Martins Creek Steam Electric Station in Pennsylvania is described. The design, operation, and performance of these oil-fueled units are discussed. (LCL)
van Lent, Wineke A M; de Beer, Relinde D; van Harten, Wim H
2010-08-31
Benchmarking is one of the methods used in business that is applied to hospitals to improve the management of their operations. International comparison between hospitals can explain performance differences. As there is a trend towards specialization of hospitals, this study examines the benchmarking process and the success factors of benchmarking in international specialized cancer centres. Three independent international benchmarking studies on operations management in cancer centres were conducted. The first study included three comprehensive cancer centres (CCC), three chemotherapy day units (CDU) were involved in the second study and four radiotherapy departments were included in the final study. Per multiple case study a research protocol was used to structure the benchmarking process. After reviewing the multiple case studies, the resulting description was used to study the research objectives. We adapted and evaluated existing benchmarking processes through formalizing stakeholder involvement and verifying the comparability of the partners. We also devised a framework to structure the indicators to produce a coherent indicator set and better improvement suggestions. Evaluating the feasibility of benchmarking as a tool to improve hospital processes led to mixed results. Case study 1 resulted in general recommendations for the organizations involved. In case study 2, the combination of benchmarking and lean management led in one CDU to a 24% increase in bed utilization and a 12% increase in productivity. Three radiotherapy departments of case study 3, were considering implementing the recommendations.Additionally, success factors, such as a well-defined and small project scope, partner selection based on clear criteria, stakeholder involvement, simple and well-structured indicators, analysis of both the process and its results and, adapt the identified better working methods to the own setting, were found. The improved benchmarking process and the success factors can produce relevant input to improve the operations management of specialty hospitals.
2010-01-01
Background Benchmarking is one of the methods used in business that is applied to hospitals to improve the management of their operations. International comparison between hospitals can explain performance differences. As there is a trend towards specialization of hospitals, this study examines the benchmarking process and the success factors of benchmarking in international specialized cancer centres. Methods Three independent international benchmarking studies on operations management in cancer centres were conducted. The first study included three comprehensive cancer centres (CCC), three chemotherapy day units (CDU) were involved in the second study and four radiotherapy departments were included in the final study. Per multiple case study a research protocol was used to structure the benchmarking process. After reviewing the multiple case studies, the resulting description was used to study the research objectives. Results We adapted and evaluated existing benchmarking processes through formalizing stakeholder involvement and verifying the comparability of the partners. We also devised a framework to structure the indicators to produce a coherent indicator set and better improvement suggestions. Evaluating the feasibility of benchmarking as a tool to improve hospital processes led to mixed results. Case study 1 resulted in general recommendations for the organizations involved. In case study 2, the combination of benchmarking and lean management led in one CDU to a 24% increase in bed utilization and a 12% increase in productivity. Three radiotherapy departments of case study 3, were considering implementing the recommendations. Additionally, success factors, such as a well-defined and small project scope, partner selection based on clear criteria, stakeholder involvement, simple and well-structured indicators, analysis of both the process and its results and, adapt the identified better working methods to the own setting, were found. Conclusions The improved benchmarking process and the success factors can produce relevant input to improve the operations management of specialty hospitals. PMID:20807408
Second stage gasifier in staged gasification and integrated process
Liu, Guohai; Vimalchand, Pannalal; Peng, Wan Wang
2015-10-06
A second stage gasification unit in a staged gasification integrated process flow scheme and operating methods are disclosed to gasify a wide range of low reactivity fuels. The inclusion of second stage gasification unit operating at high temperatures closer to ash fusion temperatures in the bed provides sufficient flexibility in unit configurations, operating conditions and methods to achieve an overall carbon conversion of over 95% for low reactivity materials such as bituminous and anthracite coals, petroleum residues and coke. The second stage gasification unit includes a stationary fluidized bed gasifier operating with a sufficiently turbulent bed of predefined inert bed material with lean char carbon content. The second stage gasifier fluidized bed is operated at relatively high temperatures up to 1400.degree. C. Steam and oxidant mixture can be injected to further increase the freeboard region operating temperature in the range of approximately from 50 to 100.degree. C. above the bed temperature.
Modrykamien, Ariel M; Daoud, Yahya
2018-01-01
Optimal mechanical ventilation management in patients with the acute respiratory distress syndrome (ARDS) involves the use of low tidal volumes and limited plateau pressure. Refractory hypoxemia may not respond to this strategy, requiring other interventions. The use of prone positioning in severe ARDS resulted in improvement in 28-day survival. To determine whether mechanical ventilation strategies or other parameters affected survival in patients undergoing prone positioning, a retrospective analysis was conducted of a consecutive series of patients with severe ARDS treated with prone positioning. Demographic and clinical information involving mechanical ventilation strategies, as well as other variables associated with prone positioning, was collected. The rate of in-hospital mortality was obtained, and previously described parameters were compared between survivors and nonsurvivors. Forty-three patients with severe ARDS were treated with prone positioning, and 27 (63%) died in the intensive care unit. Only three parameters were significant predictors of survival: APACHE II score ( P = 0.03), plateau pressure ( P = 0.02), and driving pressure ( P = 0.04). The ability of each of these parameters to predict mortality was assessed with receiver operating characteristic curves. The area under the curve values for APACHE II, plateau pressure, and driving pressure were 0.74, 0.69, and 0.67, respectively. In conclusion, in a group of patients with severe ARDS treated with prone positioning, only APACHE II, plateau pressure, and driving pressure were associated with mortality in the intensive care unit.
Globalization and reproductive tourism in the United Arab Emirates.
Inhorn, Marcia C; Shrivastav, Pankaj
2010-07-01
Over the past 2 decades, the discipline of anthropology has been deeply concerned with the processes and effects of globalization around the world. One of the major anthropological theorists of globalization, Arjun Appadurai, has delineated a "global cultural economy" in which global movements operate through 5 pathways, which he famously called "scapes." This article uses the language of "scapes" to examine the global flows involved in so-called "reproductive tourism," or the search for assisted reproductive technologies across national and international borders. Reproductive tourism entails a complex "reproscape" of moving people, technologies, finance, media, ideas, and gametes, pursued by infertile couples in their "quests for conception." This article examines reproductive tourism to and from the United Arab Emirates, which is now the site of intense globalization and global flows, including individual and population movements for the purposes of reproductive and other forms of medical care.
Cloud Computing for radiologists.
Kharat, Amit T; Safvi, Amjad; Thind, Ss; Singh, Amarjit
2012-07-01
Cloud computing is a concept wherein a computer grid is created using the Internet with the sole purpose of utilizing shared resources such as computer software, hardware, on a pay-per-use model. Using Cloud computing, radiology users can efficiently manage multimodality imaging units by using the latest software and hardware without paying huge upfront costs. Cloud computing systems usually work on public, private, hybrid, or community models. Using the various components of a Cloud, such as applications, client, infrastructure, storage, services, and processing power, Cloud computing can help imaging units rapidly scale and descale operations and avoid huge spending on maintenance of costly applications and storage. Cloud computing allows flexibility in imaging. It sets free radiology from the confines of a hospital and creates a virtual mobile office. The downsides to Cloud computing involve security and privacy issues which need to be addressed to ensure the success of Cloud computing in the future.
NASA Technical Reports Server (NTRS)
Ramakumar, R.; Bahrami, K.
1981-01-01
This paper discusses the application of field modulated generator systems (FMGS) to dispersed solar-thermal-electric generation from a parabolic dish field with electric transport. Each solar generation unit is rated at 15 kWe and the power generated by an array of such units is electrically collected for insertion into an existing utility grid. Such an approach appears to be most suitable when the heat engine rotational speeds are high (greater than 6000 r/min) and, in particular, if they are operated in the variable speed mode and if utility-grade a.c. is required for direct insertion into the grid without an intermediate electric energy storage and reconversion system. Predictions of overall efficiencies based on conservative efficiency figures for the FMGS are in the range of 25 per cent and should be encouraging to those involved in the development of cost-effective dispersed solar thermal power systems.
Advances in on-line drinking water quality monitoring and early warning systems.
Storey, Michael V; van der Gaag, Bram; Burns, Brendan P
2011-01-01
Significant advances have been made in recent years in technologies to monitor drinking water quality for source water protection, treatment operations, and distribution system management, in the event of accidental (or deliberate) contamination. Reports prepared through the Global Water Research Coalition (GWRC) and United States Environment Protection Agency (USEPA) agree that while many emerging technologies show promise, they are still some years from being deployed on a large scale. Further underpinning their viability is a need to interpret data in real time and implement a management strategy in response. This review presents the findings of an international study into the state of the art in this field. These results are based on visits to leading water utilities, research organisations and technology providers throughout Europe, the United States and Singapore involved in the development and deployment of on-line monitoring technology for the detection of contaminants in water. Copyright © 2010 Elsevier Ltd. All rights reserved.
Wrist Camera Orientation for Effective Telerobotic Orbital Replaceable Unit (ORU) Changeout
NASA Technical Reports Server (NTRS)
Jones, Sharon Monica; Aldridge, Hal A.; Vazquez, Sixto L.
1997-01-01
The Hydraulic Manipulator Testbed (HMTB) is the kinematic replica of the Flight Telerobotic Servicer (FTS). One use of the HMTB is to evaluate advanced control techniques for accomplishing robotic maintenance tasks on board the Space Station. Most maintenance tasks involve the direct manipulation of the robot by a human operator when high-quality visual feedback is important for precise control. An experiment was conducted in the Systems Integration Branch at the Langley Research Center to compare several configurations of the manipulator wrist camera for providing visual feedback during an Orbital Replaceable Unit changeout task. Several variables were considered such as wrist camera angle, camera focal length, target location, lighting. Each study participant performed the maintenance task by using eight combinations of the variables based on a Latin square design. The results of this experiment and conclusions based on data collected are presented.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alvarez-Ramirez, J.; Aguilar, R.; Lopez-Isunza, F.
FCC processes involve complex interactive dynamics which are difficult to operate and control as well as poorly known reaction kinetics. This work concerns the synthesis of temperature controllers for FCC units. The problem is addressed first for the case where perfect knowledge of the reaction kinetics is assumed, leading to an input-output linearizing state feedback. However, in most industrial FCC units, perfect knowledge of reaction kinetics and composition measurements is not available. To address the problem of robustness against uncertainties in the reaction kinetics, an adaptive model-based nonlinear controller with simplified reaction models is presented. The adaptive strategy makes usemore » of estimates of uncertainties derived from calorimetric (energy) balances. The resulting controller is similar in form to standard input-output linearizing controllers and can be tuned analogously. Alternatively, the controller can be tuned using a single gain parameter and is computationally efficient. The performance of the closed-loop system and the controller design procedure are shown with simulations.« less
Cloud Computing for radiologists
Kharat, Amit T; Safvi, Amjad; Thind, SS; Singh, Amarjit
2012-01-01
Cloud computing is a concept wherein a computer grid is created using the Internet with the sole purpose of utilizing shared resources such as computer software, hardware, on a pay-per-use model. Using Cloud computing, radiology users can efficiently manage multimodality imaging units by using the latest software and hardware without paying huge upfront costs. Cloud computing systems usually work on public, private, hybrid, or community models. Using the various components of a Cloud, such as applications, client, infrastructure, storage, services, and processing power, Cloud computing can help imaging units rapidly scale and descale operations and avoid huge spending on maintenance of costly applications and storage. Cloud computing allows flexibility in imaging. It sets free radiology from the confines of a hospital and creates a virtual mobile office. The downsides to Cloud computing involve security and privacy issues which need to be addressed to ensure the success of Cloud computing in the future. PMID:23599560
Liljamo, Pia; Lavander, Päivi; Kejonen, Pirjo
2016-01-01
The Oulu University Hospital's staffing management project sought information on the number of nursing staff in relation to treatment days and visits, using existing indicators to describe the activities involved. The retrospective data obtained was compared to human resources and the personnel structure. On this basis an optimal number of staff was determined for the units, taking account of a range of explanatory indicator data. The project made use of the computational model for nurse staffing and the World Health Organisation's (WHO) Workload Indicators of Staffing Need (WISN) method. The project provided extensive information on human resources issues within the units. Its results indicated the differences between wards with respect to the number and structure of resources. In addition, the nurse administrators lacked skills in gathering and using data from administrative datasets. This information will provide support for the further development of nursing operations and nursing management decision-making.
Code of Federal Regulations, 2010 CFR
2010-10-01
..., repairs, or other such operations involving riveting, welding, burning or like fire-producing actions. 71... required when making alterations, repairs, or other such operations involving riveting, welding, burning or... undertaken with safety, no alterations, repairs, or other such operations involving riveting, welding...
Code of Federal Regulations, 2012 CFR
2012-10-01
..., repairs, or other such operations involving riveting, welding, burning or like fire-producing actions. 71... required when making alterations, repairs, or other such operations involving riveting, welding, burning or... undertaken with safety, no alterations, repairs, or other such operations involving riveting, welding...
Code of Federal Regulations, 2011 CFR
2011-10-01
..., repairs, or other such operations involving riveting, welding, burning or like fire-producing actions. 71... required when making alterations, repairs, or other such operations involving riveting, welding, burning or... undertaken with safety, no alterations, repairs, or other such operations involving riveting, welding...
Code of Federal Regulations, 2014 CFR
2014-10-01
..., repairs, or other such operations involving riveting, welding, burning or like fire-producing actions. 71... required when making alterations, repairs, or other such operations involving riveting, welding, burning or... undertaken with safety, no alterations, repairs, or other such operations involving riveting, welding...
Code of Federal Regulations, 2013 CFR
2013-10-01
..., repairs, or other such operations involving riveting, welding, burning or like fire-producing actions. 71... required when making alterations, repairs, or other such operations involving riveting, welding, burning or... undertaken with safety, no alterations, repairs, or other such operations involving riveting, welding...
2012-01-01
Background Analysis is lacking on the management of vector control systems in disease-endemic countries with respect to the efficiency and sustainability of operations. Methods Three locations were selected, at the scale of province, municipality and barangay (i.e. village). Data on disease incidence, programme activities, and programme management were collected on-site through meetings and focus group discussions. Results Adaptation of disease control strategies to the epidemiological situation per barangay, through micro-stratification, brings gains in efficiency, but should be accompanied by further capacity building on local situational analysis for better selection and targeting of vector control interventions within the barangay. An integrated approach to vector control, aiming to improve the rational use of resources, was evident with a multi-disease strategy for detection and response, and by the use of combinations of vector control methods. Collaboration within the health sector was apparent from the involvement of barangay health workers, re-orientation of job descriptions and the creation of a disease surveillance unit. The engagement of barangay leaders and use of existing community structures helped mobilize local resources and voluntary services for vector control. In one location, local authorities and the community were involved in the planning, implementation and evaluation of malaria control, which triggered local programme ownership. Conclusions Strategies that contributed to an improved efficiency and sustainability of vector control operations were: micro-stratification, integration of vector control within the health sector, a multi-disease approach, involvement of local authorities, and empowerment of communities. Capacity building on situational analysis and vector surveillance should be addressed through national policy and guidelines. PMID:22873707
Surgical management of contiguous multilevel thoracolumbar tuberculous spondylitis.
Qureshi, Muhammad Asad; Khalique, Ahmed Bilal; Afzal, Waseem; Pasha, Ibrahim Farooq; Aebi, Max
2013-06-01
Tuberculous spondylitis (TBS) is the most common form of extra-pulmonary tuberculosis. The mainstay of TBS management is anti-tuberculous chemotherapy. Most of the patients with TBS are treated conservatively; however in some patients surgery is indicated. Most common indications for surgery include neurological deficit, deformity, instability, large abscesses and necrotic tissue mass or inadequate response to anti-tuberculous chemotherapy. The most common form of TBS involves a single motion segment of spine (two adjoining vertebrae and their intervening disc). Sometimes TBS involves more than two adjoining vertebrae, when it is called multilevel TBS. Indications for correct surgical management of multilevel TBS is not clear from literature. We have retrospectively reviewed 87 patients operated in 10 years for multilevel TBS involving the thoracolumbar spine at our spine unit. Two types of surgeries were performed on these patients. In 57 patients, modified Hong Kong operation was performed with radical debridement, strut grafting and anterior instrumentation. In 30 patients this operation was combined with pedicle screw fixation with or without correction of kyphosis by osteotomy. Patients were followed up for correction of kyphosis, improvement in neurological deficit, pain and function. Complications were noted. On long-term follow-up (average 64 months), there was 9.34 % improvement in kyphosis angle in the modified Hong Kong group and 47.58 % improvement in the group with pedicle screw fixation and osteotomy in addition to anterior surgery (p < 0.001). Seven patients had implant failures and revision surgeries in the modified Hong Kong group. Neurological improvement, pain relief and functional outcome were the same in both groups. We conclude that pedicle screw fixation with or without a correcting osteotomy should be added in all patients with multilevel thoracolumbar tuberculous spondylitis undergoing radical debridement and anterior column reconstruction.
RhBMP-7 for the treatment of nonunion of fractures of long bones.
Papanagiotou, M; Dailiana, Z H; Karachalios, T; Varitimidis, S; Vlychou, M; Hantes, M; Malizos, K N
2015-07-01
We report the outcome of 84 nonunions involving long bones which were treated with rhBMP-7, in 84 patients (60 men: 24 women) with a mean age 46 years (18 to 81) between 2003 and 2011. The patients had undergone a mean of three previous operations (one to 11) for nonunion which had been present for a mean of 17 months (4 months to 20 years). The nonunions involved the lower limb in 71 patients and the remainder involved the upper limb. A total of 30 nonunions were septic. Treatment was considered successful when the nonunion healed without additional procedures. The relationship between successful union and the time to union was investigated and various factors including age and gender, the nature of the nonunion (location, size, type, chronicity, previous procedures, infection, the condition of the soft tissues) and type of index procedure (revision of fixation, type of graft, amount of rhBMP-7) were analysed. The improvement of the patients' quality of life was estimated using the Short Form (SF) 12 score. A total of 68 nonunions (80.9%) healed with no need for further procedures at a mean of 5.4 months (3 to 10) post-operatively. Multivariate logistic regression analysis of the factors affecting union suggested that only infection significantly affected the rate of union (p = 0.004).Time to union was only affected by the number of previous failed procedures (p = 0.006). An improvement of 79% and 32.2% in SF-12 physical and mental score, respectively, was noted within the first post-operative year. Rh-BMP-7 combined with bone grafts, enabled healing of the nonunion and improved quality of life in about 80% of patients. Aseptic nonunions were much more likely to unite than septic ones. The number of previous failed operations significantly delayed the time to union. ©2015 The British Editorial Society of Bone & Joint Surgery.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-16
... with multiple bowls that are joined through a welding operation to form one unit are covered by the... bowls that are joined through a welding operation to form one unit are covered by the scope of the... sinks with multiple drawn bowls that are joined through a welding operation to form one unit are covered...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Operating Limits for Inorganic HAP Emission Limitations for Catalytic Reforming Units 23 Table 23 to Subpart UUU of Part 63 Protection of... Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 23 Table 23 to Subpart UUU of Part 63—Operating Limits...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Operating Limits for Metal HAP Emissions From Catalytic Cracking Units 2 Table 2 to Subpart UUU of Part 63 Protection of Environment... Units Pt. 63, Subpt. UUU, Table 2 Table 2 to Subpart UUU of Part 63—Operating Limits for Metal HAP...
Code of Federal Regulations, 2010 CFR
2010-07-01
... 40 Protection of Environment 12 2010-07-01 2010-07-01 true Operating Limits for Inorganic HAP Emission Limitations for Catalytic Reforming Units 23 Table 23 to Subpart UUU of Part 63 Protection of... Units Pt. 63, Subpt. UUU, Table 23 Table 23 to Subpart UUU of Part 63—Operating Limits for Inorganic HAP...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Operating Limits for Organic HAP Emissions From Catalytic Reforming Units 16 Table 16 to Subpart UUU of Part 63 Protection of Environment... Units Pt. 63, Subpt. UUU, Table 16 Table 16 to Subpart UUU of Part 63—Operating Limits for Organic HAP...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Operating Limits for Organic HAP Emissions From Catalytic Cracking Units 9 Table 9 to Subpart UUU of Part 63 Protection of Environment... Units Pt. 63, Subpt. UUU, Table 9 Table 9 to Subpart UUU of Part 63—Operating Limits for Organic HAP...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Operating Limits for Organic HAP Emissions From Catalytic Reforming Units 16 Table 16 to Subpart UUU of Part 63 Protection of Environment... Units Pt. 63, Subpt. UUU, Table 16 Table 16 to Subpart UUU of Part 63—Operating Limits for Organic HAP...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Operating Limits for Inorganic HAP Emission Limitations for Catalytic Reforming Units 23 Table 23 to Subpart UUU of Part 63 Protection of... Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 23 Table 23 to Subpart UUU of Part 63—Operating Limits...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Operating Limits for Metal HAP Emissions From Catalytic Cracking Units 2 Table 2 to Subpart UUU of Part 63 Protection of Environment... Units Pt. 63, Subpt. UUU, Table 2 Table 2 to Subpart UUU of Part 63—Operating Limits for Metal HAP...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Operating Limits for Inorganic HAP Emission Limitations for Catalytic Reforming Units 23 Table 23 to Subpart UUU of Part 63 Protection of... Sulfur Recovery Units Pt. 63, Subpt. UUU, Table 23 Table 23 to Subpart UUU of Part 63—Operating Limits...
Code of Federal Regulations, 2011 CFR
2011-07-01
... 40 Protection of Environment 12 2011-07-01 2009-07-01 true Operating Limits for Inorganic HAP Emission Limitations for Catalytic Reforming Units 23 Table 23 to Subpart UUU of Part 63 Protection of... Units Pt. 63, Subpt. UUU, Table 23 Table 23 to Subpart UUU of Part 63—Operating Limits for Inorganic HAP...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Operating Limits for Metal HAP Emissions From Catalytic Cracking Units 2 Table 2 to Subpart UUU of Part 63 Protection of Environment... Units Pt. 63, Subpt. UUU, Table 2 Table 2 to Subpart UUU of Part 63—Operating Limits for Metal HAP...
Code of Federal Regulations, 2014 CFR
2014-07-01
... 40 Protection of Environment 13 2014-07-01 2014-07-01 false Operating Limits for Organic HAP Emissions From Catalytic Cracking Units 9 Table 9 to Subpart UUU of Part 63 Protection of Environment... Units Pt. 63, Subpt. UUU, Table 9 Table 9 to Subpart UUU of Part 63—Operating Limits for Organic HAP...
Code of Federal Regulations, 2012 CFR
2012-07-01
... 40 Protection of Environment 13 2012-07-01 2012-07-01 false Operating Limits for Organic HAP Emissions From Catalytic Cracking Units 9 Table 9 to Subpart UUU of Part 63 Protection of Environment... Units Pt. 63, Subpt. UUU, Table 9 Table 9 to Subpart UUU of Part 63—Operating Limits for Organic HAP...
Code of Federal Regulations, 2013 CFR
2013-07-01
... 40 Protection of Environment 13 2013-07-01 2012-07-01 true Operating Limits for Organic HAP Emissions From Catalytic Reforming Units 16 Table 16 to Subpart UUU of Part 63 Protection of Environment... Units Pt. 63, Subpt. UUU, Table 16 Table 16 to Subpart UUU of Part 63—Operating Limits for Organic HAP...
1994-06-01
technologies were organized into five categories: * In Situ Biological Treatment * In Situ Physical/Chemical Treatment * Ex Situ Biological Groundwater...Technology FIGURE 11-3 PRIMARY SCORING SUMMARY EX SITU BIOLOGICAL GROUNDWATER TREATMENT TECHNOLOGIES GROUNDWATER OPERABLE UNIT RIIFS McCLELLAN AIR FORCE... Biological Treatment CometabolicAnaerobic Anaerobic/Aerobic In Situ Physical/Chemical Treatment Sparging/Soil Vapor Extraction Ex Situ Biological
Quality and strength of patient safety climate on medical-surgical units.
Hughes, Linda C; Chang, Yunkyung; Mark, Barbara A
2009-01-01
Describing the safety climate in hospitals is an important first step in creating work environments where safety is a priority. Yet, little is known about the patient safety climate on medical-surgical units. Study purposes were to describe quality and strength of the patient safety climate on medical-surgical units and explore hospital and unit characteristics associated with this climate. Data came from a larger organizational study to investigate hospital and unit characteristics associated with organizational, nurse, and patient outcomes. The sample for this study was 3,689 RNs on 286 medical-surgical units in 146 hospitals. Nursing workgroup and managerial commitment to safety were the two most strongly positive attributes of the patient safety climate. However, issues surrounding the balance between job duties and safety compliance and nurses' reluctance to reveal errors continue to be problematic. Nurses in Magnet hospitals were more likely to communicate about errors and participate in error-related problem solving. Nurses on smaller units and units with lower work complexity reported greater safety compliance and were more likely to communicate about and reveal errors. Nurses on smaller units also reported greater commitment to patient safety and participation in error-related problem solving. Nursing workgroup commitment to safety is a valuable resource that can be leveraged to promote a sense of personal responsibility for and shared ownership of patient safety. Managers can capitalize on this commitment by promoting a work environment in which control over nursing practice and active participation in unit decisions are encouraged and by developing channels of communication that increase staff nurse involvement in identifying patient safety issues, prioritizing unit-level safety goals, and resolving day-to-day operational problems the have the potential to jeopardize patient safety.
Baslow, Morris H
2011-01-01
The human brain is a complex organ made up of neurons and several other cell types, and whose role is processing information for use in eliciting behaviors. However, the composition of its repeating cellular units for both structure and function are unresolved. Based on recent descriptions of the brain's physiological "operating system", a function of the tri-cellular metabolism of N-acetylaspartate (NAA) and N-acetylaspartylglutamate (NAAG) for supply of energy, and on the nature of "neuronal words and languages" for intercellular communication, insights into the brain's modular structural and functional units have been gained. In this article, it is proposed that the basic structural unit in brain is defined by its physiological operating system, and that it consists of a single neuron, and one or more astrocytes, oligodendrocytes, and vascular system endothelial cells. It is also proposed that the basic functional unit in the brain is defined by how neurons communicate, and consists of two neurons and their interconnecting dendritic-synaptic-dendritic field. Since a functional unit is composed of two neurons, it requires two structural units to form a functional unit. Thus, the brain can be envisioned as being made up of the three-dimensional stacking and intertwining of myriad structural units which results not only in its gross structure, but also in producing a uniform distribution of binary functional units. Since the physiological NAA-NAAG operating system for supply of energy is repeated in every structural unit, it is positioned to control global brain function.
40 CFR 62.14625 - What if all the qualified operators are temporarily not accessible?
Code of Federal Regulations, 2011 CFR
2011-07-01
... qualified operator will be accessible. (2) Submit a status report to the Administrator every 4 weeks... operation of the CISWI unit. You must submit the first status report 4 weeks after you notify the... operators are not accessible for more than 8 hours, but less than 2 weeks, the CISWI unit may be operated by...
40 CFR 62.14625 - What if all the qualified operators are temporarily not accessible?
Code of Federal Regulations, 2010 CFR
2010-07-01
... qualified operator will be accessible. (2) Submit a status report to the Administrator every 4 weeks... operation of the CISWI unit. You must submit the first status report 4 weeks after you notify the... operators are not accessible for more than 8 hours, but less than 2 weeks, the CISWI unit may be operated by...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Fynan, G.A.; Sload, A.; Adamson, E.J.
This paper presents the successes and lessons learned during recent low NOx burner and SNCR projects on generating units at New England Power`s Salem Harbor Generating Station. The principals involved in the project were New England Power Company, New England Power Service Company, Stone and Webster Engineering Corp. and Deutsche-Babcock Riley Inc. One unit was retrofitted with 16 Riley CCV burners with an OFA system, the other with 12 low NOx burners only. In addition to the burners, a SNCR system was also installed on three units. Since each of the burner systems are interdependent (SNCR was treated separately duringmore » design phases and optimized along with the burner systems), close cooperation during the design stages was essential to ensuring a successful installation, startup and optimization. This paper will present the coordinated effort put forth by each company toward this goal with the hope of assisting others who may be planning a similar effort. A summary of the operating results will also be presented. The up front teamwork and advance planning that went into the design stages of the project resulted in a number of successful outcomes e.g. scanner reliability, properly operating oil supply system, compatibility of burners and burner front oil system with new Burner Management System (BMS), reliable first attempt burner ignition and more. Advance planning facilitated pre-outage work and factored into keeping schedules and budgets on track.« less
Bartley, Judene; Streifel, Andrew J
2010-08-01
We review the context of the environment of care in the intensive care unit setting in relation to patient safety and quality, specifically addressing healthcare-associated infection issues and solutions involving interdisciplinary teams. Issues addressed include current and future architectural design and layout trends, construction trends affecting intensive care units, and prevention of construction-associated healthcare-associated infections related to airborne and waterborne risks and design solutions. Specific elements include single-occupancy, acuity-scalable intensive care unit rooms; environmental aspects of hand hygiene, such as water risks, sink design/location, human waste management, surface selection (floor covering, countertops, furniture, and equipment) and cleaning, antimicrobial-treated or similar materials, ultraviolet germicidal irradiation, specialized rooms (airborne infection isolation and protective environments), and water system design and strategies for safe use of potable water and mitigation of water intrusion. Effective design and operational use of the intensive care unit environment of care must engage critical care personnel from initial planning and design through occupancy of the new/renovated intensive care unit as part of the infection control risk assessment team. The interdisciplinary infection control risk assessment team can address key environment of care design features to enhance the safety of intensive care unit patients, personnel, and visitors. This perspective will ensure the environment of care supports human factors and behavioral aspects of the interaction between the environment of care and its occupants.
2014 Highlights of Ferry Operations in the United States
DOT National Transportation Integrated Search
2016-05-01
Based on information provided by operators who responded to the 2014 National Census of Ferry Operators (NCFO), the Bureau of Transportation Statistics (BTS) conservatively estimates that ferries in the United States carried just over 115 million pas...
Models of unit operations used for solid-waste processing
DOE Office of Scientific and Technical Information (OSTI.GOV)
Savage, G.M.; Glaub, J.C.; Diaz, L.F.
1984-09-01
This report documents the unit operations models that have been developed for typical refuse-derived-fuel (RDF) processing systems. These models, which represent the mass balances, energy requirements, and economics of the unit operations, are derived, where possible, from basic principles. Empiricism has been invoked where a governing theory has yet to be developed. Field test data and manufacturers' information, where available, supplement the analytical development of the models. A literature review has also been included for the purpose of compiling and discussing in one document the available information pertaining to the modeling of front-end unit operations. Separate analytics have been donemore » for each task.« less
Performing an allreduce operation using shared memory
Archer, Charles J [Rochester, MN; Dozsa, Gabor [Ardsley, NY; Ratterman, Joseph D [Rochester, MN; Smith, Brian E [Rochester, MN
2012-04-17
Methods, apparatus, and products are disclosed for performing an allreduce operation using shared memory that include: receiving, by at least one of a plurality of processing cores on a compute node, an instruction to perform an allreduce operation; establishing, by the core that received the instruction, a job status object for specifying a plurality of shared memory allreduce work units, the plurality of shared memory allreduce work units together performing the allreduce operation on the compute node; determining, by an available core on the compute node, a next shared memory allreduce work unit in the job status object; and performing, by that available core on the compute node, that next shared memory allreduce work unit.
Development of a novel ice-resistant semisubmersible drilling unit
DOE Office of Scientific and Technical Information (OSTI.GOV)
Corona, E.N.; Schloerb, D.W.; Yashima, N.
1983-05-01
A multiyear program was initiated by ARCO Alaska, Inc. to assess the operational feasibility of drilling operations year-round in the ice-covered waters of the Bering, Chukchi, and Beaufort Seas. ARCO Alaska, Inc. is considering several alternative concepts for year-round drilling in the Bering Sea. One such concept, the Ice-Resistant Semisubmersible Drilling Unit, is a design concept of Mitsui Engineering and Shipbuilding Company. The design is intended to operate in broken, continuous, and ridged sea ice, and withstand severe open water sea conditions. The requirement to operate in two dissimilar environments results in a unit that is somewhat unusual when comparedmore » to typical semisubmersible drilling units.« less
Performing an allreduce operation using shared memory
Archer, Charles J; Dozsa, Gabor; Ratterman, Joseph D; Smith, Brian E
2014-06-10
Methods, apparatus, and products are disclosed for performing an allreduce operation using shared memory that include: receiving, by at least one of a plurality of processing cores on a compute node, an instruction to perform an allreduce operation; establishing, by the core that received the instruction, a job status object for specifying a plurality of shared memory allreduce work units, the plurality of shared memory allreduce work units together performing the allreduce operation on the compute node; determining, by an available core on the compute node, a next shared memory allreduce work unit in the job status object; and performing, by that available core on the compute node, that next shared memory allreduce work unit.
Evaluating MC&A effectiveness to verify the presence of nuclear materials
DOE Office of Scientific and Technical Information (OSTI.GOV)
Dawson, P. G.; Morzinski, J. A.; Ostenak, Carl A.
Traditional materials accounting is focused exclusively on the material balance area (MBA), and involves periodically closing a material balance based on accountability measurements conducted during a physical inventory. In contrast, the physical inventory for Los Alamos National Laboratory's near-real-time accounting system is established around processes and looks more like an item inventory. That is, the intent is not to measure material for accounting purposes, since materials have already been measured in the normal course of daily operations. A given unit process operates many times over the course of a material balance period. The product of a given unit process maymore » move for processing within another unit process in the same MBA or may be transferred out of the MBA. Since few materials are unmeasured the physical inventory for a near-real-time process area looks more like an item inventory. Thus, the intent of the physical inventory is to locate the materials on the books and verify information about the materials contained in the books. Closing a materials balance for such an area is a matter of summing all the individual mass balances for the batches processed by all unit processes in the MBA. Additionally, performance parameters are established to measure the program's effectiveness. Program effectiveness for verifying the presence of nuclear material is required to be equal to or greater than a prescribed performance level, process measurements must be within established precision and accuracy values, physical inventory results meet or exceed performance requirements, and inventory differences are less than a target/goal quantity. This approach exceeds DOE established accounting and physical inventory program requirements. Hence, LANL is committed to this approach and to seeking opportunities for further improvement through integrated technologies. This paper will provide a detailed description of this evaluation process.« less
Minimum separation distances for natural gas pipeline and boilers in the 300 area, Hanford Site
DOE Office of Scientific and Technical Information (OSTI.GOV)
Daling, P.M.; Graham, T.M.
1997-08-01
The U.S. Department of Energy (DOE) is proposing actions to reduce energy expenditures and improve energy system reliability at the 300 Area of the Hanford Site. These actions include replacing the centralized heating system with heating units for individual buildings or groups of buildings, constructing a new natural gas distribution system to provide a fuel source for many of these units, and constructing a central control building to operate and maintain the system. The individual heating units will include steam boilers that are to be housed in individual annex buildings located at some distance away from nearby 300 Area nuclearmore » facilities. This analysis develops the basis for siting the package boilers and natural gas distribution systems to be used to supply steam to 300 Area nuclear facilities. The effects of four potential fire and explosion scenarios involving the boiler and natural gas pipeline were quantified to determine minimum separation distances that would reduce the risks to nearby nuclear facilities. The resulting minimum separation distances are shown in Table ES.1.« less
MORICE--new technology for mechanical oil recovery in ice infested waters.
Jensen, Hans V; Mullin, Joseph V
2003-01-01
Mechanical oil recovery in ice infested waters (MORICE) was initiated in 1995 to develop technology for the recovery of oil spills in ice. It has been a multinational effort involving Norwegian, Canadian, American and German organizations and researchers. Through a stepwise approach with the development organized in six separate phases, laboratory tests and field experiments have been conducted to study various ideas and concepts, and to refine the ideas that were considered to have the best potential for removing oil in ice. Put together in one unit, these concepts included ice processing equipment and two alternative oil recovery units installed on a work platform. In January 2002, the final oil and ice testing with MORICE concepts was conducted at the Ohmsett test facility in Leonardo, New Jersey. The unit has been referred to as a harbor version to indicate the size and operating conditions, but the concepts could be scaled up to increase the capacity of oil and ice processing. For heavier ice conditions it would also be necessary to increase the overall strength.
Announced United States nuclear tests, July 1945 through December 1987
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1988-04-01
This document lists chronologically and alphabetically by event name all nuclear tests conducted and announced by the United States from July 1945 through December 1987, with the exception of the GMX experiments. The 24 GMX experiments, conducted at the Nevada Test Site (NTS) between December 1954 and February 1956, were /open quotes/equation-of-state/close quotes/ physics studies that used small chemical explosives and small quantities of plutonium. Several tests conducted during Operation Dominic involved missile launches from Johnston Atoll. Several of these missle launches were aborted, resulting in the destruction of the missile and nuclear device either on the pad or inmore » the air. Data on United States tests were obtained from and verified by the Department of Energy's three weapons laboratories--Los Alamos National Laboratory, Los Alamos, New Mexico; Lawrence Livermore National Laboratory, Livermore, California; and Sandia National Laboratories, Albuquerque, New Mexico. Additionally, data were obtained from public announcements issued by the Atomic Energy Commission and its successors, the Energy Research and Development Administation and the Department of Energy, respectively.« less
Code of Federal Regulations, 2012 CFR
2012-07-01
... certification, who may operate the municipal waste combustion unit? 60.1680 Section 60.1680 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Model Rule-Good Combustion Practices: Operator...
Code of Federal Regulations, 2011 CFR
2011-07-01
... certification, who may operate the municipal waste combustion unit? 60.1680 Section 60.1680 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Model Rule-Good Combustion Practices: Operator...
Code of Federal Regulations, 2013 CFR
2013-07-01
... certification, who may operate the municipal waste combustion unit? 60.1680 Section 60.1680 Protection of... NEW STATIONARY SOURCES Emission Guidelines and Compliance Times for Small Municipal Waste Combustion Units Constructed on or Before August 30, 1999 Model Rule-Good Combustion Practices: Operator...