Sample records for unknown bridge foundations

  1. Application of non-destructive testing to evaluate unknown foundations for Pennsylvania bridges.

    DOT National Transportation Integrated Search

    2013-08-01

    Unknown bridge foundations present a unique challenge to Departments of Transportation (DOT) across the country since : foundation characteristics are a necessary input to assess scour vulnerability and to develop appropriate scour countermeasures. :...

  2. Unknown foundation determination for scour.

    DOT National Transportation Integrated Search

    2012-04-01

    Unknown foundations affect about 9,000 bridges in Texas. For bridges over rivers, this creates a problem : regarding scour decisions as the calculated scour depth cannot be compared to the foundation depth, and a : very conservative costly approach m...

  3. Sustainability of bridge foundations using electrical resistivity imaging and induced polarization to support transportation safety.

    DOT National Transportation Integrated Search

    2014-04-01

    As of September 2007, there were 67,240 U.S. bridges in the National Bridge Inventory classified as having unknown : foundations (FHWA 2008). The bridges spanning rivers are of critical importance due to the risks of potential scour. In fact, it is :...

  4. Infrasound Assessment of Infrastructure Report 6: Scour Detection and Riverine Health Assessment Using Infrasound

    DTIC Science & Technology

    2016-05-01

    construed as an official Department of the Army position unless so designated by other authorized documents. DESTROY THIS REPORT WHEN NO LONGER NEEDED...20 Figure 14. Seismic and infrasound detection of a barge strike on the I-20 bridge pier during the...foundations meaning that no plans, either design or as-built, existed for the structure. Initially, bridges classified as having unknown foundations

  5. Photocopy of photograph (original print in collection of Gerald A. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of photograph (original print in collection of Gerald A. Doyle, Phoenix) Photographer unknown, June 7, 1943 AERIAL VIEW OF THE YUMA CROSSING LOOKING WEST. THE 1924 SPRR BRIDGE AND THE OCEAN-TO-OCEAN HIGHWAY BRIDGE ARE AT THE BOTTOM OF THE IMAGE. THE SITE OF SPRR BRIDGES AT MADISON AVENUE IS MARKED BY THE REMNANTS OF TWO MID-STREAM BRIDGE PIERS. THE CIRCULAR FOUNDATION OF THE SWINGING SPAN OF THE STEEL BRIDGE IS ON THE SHORELINE AT THE LEFT OF THE SOUTH (LEFT) PIER. THE RIVER IS IN FLOOD STAGE. - Yuma Crossing, Riverfront Area, between Prison Hill & Fourth Avenue, Yuma, Yuma County, AZ

  6. Characterization of bridge foundations workshop report.

    DOT National Transportation Integrated Search

    2013-11-01

    "In 2013, the Federal Highway Administration proposed a new research program for the characterization of bridge foundations. To narrow the focus and develop a research roadmap for the program, a workshop on Characterization of Bridge Foundations...

  7. Characterization of bridge foundations workshop report.

    DOT National Transportation Integrated Search

    2013-11-01

    In 2013, the Federal Highway Administration proposed a new research program for the characterization of bridge : foundations. To narrow the focus and develop a research roadmap for the program, a workshop on : Characterization of Bridge Foundation...

  8. Initial investigation of reinforced concrete filled tubes for use in bridge foundations.

    DOT National Transportation Integrated Search

    2012-06-01

    The Washington State Department of Transportation (WSDOT) frequently employs deep pile or caisson bridge : foundations for its bridge structures. Deep pile and drilled shaft foundations are increasingly important for seismic : design in Washington st...

  9. A study on seismic behavior of pile foundations of bridge abutment on liquefiable ground through shaking table tests

    NASA Astrophysics Data System (ADS)

    Nakata, Mitsuhiko; Tanimoto, Shunsuke; Ishida, Shuichi; Ohsumi, Michio; Hoshikuma, Jun-ichi

    2017-10-01

    There is risk of bridge foundations to be damaged by liquefaction-induced lateral spreading of ground. Once bridge foundations have been damaged, it takes a lot of time for restoration. Therefore, it is important to assess the seismic behavior of the foundations on liquefiable ground appropriately. In this study, shaking table tests of models on a scale of 1/10 were conducted at the large scale shaking table in Public Works Research Institute, Japan, to investigate the seismic behavior of pile-supported bridge abutment on liquefiable ground. The shaking table tests were conducted for three types of model. Two are models of existing bridge which was built without design for liquefaction and the other is a model of bridge which was designed based on the current Japanese design specifications for highway bridges. As a result, the bending strains of piles of the abutment which were designed based on the current design specifications were less than those of the existing bridge.

  10. Open to Critique: Predictive Effects of Academic Outcomes from a Bridging/Foundation Programme on First-Year Degree-Level Study

    ERIC Educational Resources Information Center

    Curtis, Elana; Wikaire, Erena; Jiang, Yannan; McMillan, Louise; Loto, Robert; Fonua, Sonia; Herbert, Rowan; Hori, Melissa; Ko, Teri; Newport, Rochelle; Salter, David; Wiles, Janine; Airini; Reid, Papaarangi

    2017-01-01

    Bridging/foundation programmes are often provided by tertiary institutions to increase equity in access and academic performance of students from under-served communities. Little empirical evidence exists to measure the effectiveness of these bridging/foundation programmes on undergraduate academic outcomes. This research identifies the predictive…

  11. Assessment of bridge scour in the lower, middle, and upper Yangtze River estuary with riverbed sonar profiling techniques.

    PubMed

    Zheng, Shuwei; Xu, Y Jun; Cheng, Heqin; Wang, Bo; Lu, Xuejun

    2017-12-12

    Riverbed scour of bridge piers can cause rapid loss in foundation strength, leading to sudden bridge collapse. This study used multi-beam echo sounders (Seabat 7125) to map riverbed surrounding the foundations of four major bridges in the lower, middle, and upper reaches of the 700-km Yangtze River Estuary (YRE) during June 2015 and September 2016. The high-resolution data were utilized to analyze the morphology of the bridge scour and the deformation of the wide-area riverbed (i.e., 5-18 km long and 1.3-8.3 km wide). In addition, previous bathymetric measurements collected in 1998, 2009, and 2013 were used to determine riverbed erosion and deposition at the bridge reaches. Our study shows that the scour depth surrounding the bridge foundations progressed up to 4.4-19.0 m in the YRE. Over the past 5-15 years, the total channel erosion in some river reaches was up to 15-17 m, possessing a threat to the bridge safety in the YRE. Tide cycles seemed to have resulted in significant variation in the scour morphology in the lower and middle YRE. In the lower YRE, the riverbed morphology displayed one long erosional ditch on both sides of the bridge foundations and a long-strip siltation area distributed upstream and downstream of the bridge foundations; in the middle YRE, the riverbed morphology only showed erosional morphology surrounding the bridge foundations. Large dunes caused deep cuts and steeper contours in the bridge scour. Furthermore, this study demonstrates that the high-resolution grid model formed by point cloud data of multi-beam echo sounders can clearly display the morphology of the bridge scour in terms of wide areas and that the sonar technique is a very useful tool in the assessment of bridge scours.

  12. Capacity of scour-damaged bridges, part 2 : Integrated Analysis Program (IAP) - a program for the analysis of lateral performance of pile-supported structures under scour conditions.

    DOT National Transportation Integrated Search

    2013-11-01

    Scour is the removal of soils in the vicinity of bridge foundations, resulting in a reduced capacity of the foundations, which can increase the risk of bridge : failure. To minimize bridge failure, the Federal Highway Administration (FHWA) has establ...

  13. Capacity of scour-damaged bridges, part 2 : Integrated Analysis Program (IAP) - a program for the analysis of lateral performance of pile-supported structures under scour conditions, [technical summary].

    DOT National Transportation Integrated Search

    2013-11-01

    Scour is the removal of soils in the vicinity of bridge foundations, resulting in a reduced capacity of the foundations, which can increase the risk of bridge failure. To minimize bridge failure, the Federal Highway Administration (FHWA) has establis...

  14. The Deformation of Overburden Soil and Interaction with Pile Foundations of Bridges Induced by Normal Faulting

    NASA Astrophysics Data System (ADS)

    Wu, Liang-Chun; Li, Chien-Hung; Chan, Pei-Chen; Lin, Ming-Lang

    2017-04-01

    According to the investigations of well-known disastrous earthquakes in recent years, ground deformation induced by faulting is one of the causes for engineering structure damages in addition to strong ground motion. Most of structures located on faulting zone has been destroyed by fault offset. Take the Norcia Earthquake in Italy (2016, Mw=6.2) as an example, the highway bridge in Arquata crossing the rupture area of the active normal fault suffered a quantity of displacement which causing abutment settlement, the piers of bridge fractured and so on. However, The Seismic Design Provisions and Commentary for Highway Bridges in Taiwan, the stating of it in the general rule of first chapter, the design in bridges crossing active fault: "This specification is not applicable of making design in bridges crossing or near active fault, that design ought to the other particular considerations ".This indicates that the safty of bridges crossing active fault are not only consider the seismic performance, the most ground deformation should be attended. In this research, to understand the failure mechanism and the deformation characteristics, we will organize the case which the bridges subjected faulting at home and abroad. The processes of research are through physical sandbox experiment and numerical simulation by discrete element models (PFC3-D). The normal fault case in Taiwan is Shanchiao Fault. As above, the research can explore the deformation in overburden soil and the influences in the foundations of bridges by normal faulting. While we can understand the behavior of foundations, we will make the bridge superstructures into two separations, simple beam and continuous beam and make a further research on the main control variables in bridges by faulting. Through the above mentioned, we can then give appropriate suggestions about planning considerations and design approaches. This research presents results from sandbox experiment and 3-D numerical analysis to simulate overburden soil and embedded pile foundations subjected to normal faulting. In order to validate this numerical model, it is compared to sandbox experiments. Since the 3-D numerical analysis corresponds to the sandbox expeiments, the response of pile foundations and ground deformation induced by normal faulting are discussed. To understand the 3-D behavior of ground deformation and pile foundations, the observation such as the triangular shear zone, the width of primary deformation zone and the inclination, displacements, of the pile foundations are discussed in experiments and simulations. Furthermore, to understand the safty of bridges crossing faulting zone. The different superstructures of bridges, simple beam and continuous beam will be discussed subsequently in simulations.

  15. 7. Photocopy of photograph, date unknown. VIEW OF WEST HIGH ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photocopy of photograph, date unknown. VIEW OF WEST HIGH STREET BRIDGE OVER SOUTH BRANCH OF FRENCH CREEK, WITH PENN RAILROAD BRIDGE IN BACKGROUND. (Original in Union City Historical Museum.) 8'x10' enlargement from 4'x5' negative. - Bridge Street Bridge, Spanning Little French Creek at Bridge Street, Union City, Erie County, PA

  16. Study of displacements of a bridge abutment using FEM

    NASA Astrophysics Data System (ADS)

    Wymysłowski, Michał; Kurałowicz, Zygmunt

    2016-06-01

    Steel sheet piles are often used to support excavations for bridge foundations. When they are left in place in the permanent works, they have the potential to increase foundation bearing capacity and reduce displacements; but their presence is not usually taken into account in foundation design. In this article, the results of finite element analysis of a typical abutment foundation, with and without cover of sheet piles, are presented to demonstrate these effects. The structure described is located over the Więceminka river in the town of Kołobrzeg, Poland. It is a single-span road bridge with reinforced concrete slab.

  17. Bridge Structure, Foundation and Approach Embankment Performance for the October-November 2002 Earthquake Sequence on the Denali Fault, Alaska

    NASA Astrophysics Data System (ADS)

    Vinson, T. S.; Hulsey, L.; Ma, J.; Connor, B.; Brooks, T. E.

    2002-12-01

    More than two dozen major bridges were subjected to severe ground motions during the October-November 2002 Earthquake Sequence on the Denali Fault, Alaska. The bridges represented a number of conventional designs constructed over the past three to four decades. The objective of the field investigation presented herein was to determine the extent of the damage, if any, to the bridge structures, foundations and approach embankments. This was accomplished by direct inspection of the bridges by the authors (or employees of their organizations) along the Richardson, Alaska, Parks, and Denali Highways, the Tok Cutoff, and the railroad bridges for the railroad alignment between Trapper Creek and Fairbanks. More specifically, the members of the investigation team (represented by the authors) conducted more than three days of field inspections of bridges within the zone of severe ground shaking during the M6.7 and M7.9 Denali fault events. The primary conclusion noted was that while a substantial number of bridges were subjected to intense shaking they all performed very well and were not damaged to the extent that remedial repairs to the bridge structure were necessary. There were occurrences of lateral spreading/liquefaction related damage to the approach embankments and slight separation of the approach embankment from the abutment foundation systems. Overall, considering the severity of ground shaking, much greater damage to the bridge structures, foundations and approach embankments would be predicted. Had the earthquakes occurred during winter when the ground was frozen and the ductility of the structures was substantially reduced events comparable to the October-November 2002 Earthquake Sequence on the Denali Fault, Alaska could have resulted in significant damage to bridges. This reconnaissance was supported by the National Science Foundation, Alaska Dept. of Transportation and Public Facilities, and the Alaska Railroad Corporation.

  18. Bridge Failure Due to Inadequate Design of Bed Protection

    NASA Astrophysics Data System (ADS)

    Gupta, Yogita; Kaur, Suneet; Dindorkar, Nitin

    2017-12-01

    The shallow foundation is generally provided on non-erodible strata or where scour depth is less. It is also preferable for low perennial flow or standing water condition. In the present case study shallow foundation is adopted for box type bridge. The total length of the bridge is 132.98 m, consisting of eight unit of RCC box. Each unit is composed of three cell box. The bottom slab of box unit is acted as raft foundation, founded 500 mm below ground level. River bed protection work is provided on both upstream and downstream side along the whole length of the bridge as it is founded above scour level. The bridge collapsed during the monsoon just after two years of service. The present paper explains the cause of failure. This study on failure of the bridge illustrates the importance of bridge inspection before and after monsoon period and importance of the timely maintenance. Standard specifications of Indian Road Congress for the river bed protection work are also included.

  19. Approach for establishing approximate load carrying capacity for bridges with unknown material and unknown design properties.

    DOT National Transportation Integrated Search

    2011-07-01

    There are 16 small to medium simple span bridges in Larimer County, Colorado that are currently load rated solely based on visual inspections. Most of these bridges are prestressed concrete bridges. The objective of this project is to load rate these...

  20. 396. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    396. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; EAST BAY CROSSING; CANTILEVER STRUCTURE; DETAILS I; DRG. NO. 68 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  1. 393. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    393. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; EAST BAY CROSSING; PIER-E3; GENERAL DETAILS; DRG. NO. 47 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  2. 397. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    397. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; EAST BAY CROSSING; CANTILEVER STRUCTURE; DETAILS II; DRG. NO. 69 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  3. 398. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    398. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; EAST BAY CROSSING; GENERAL PLAN; TOWER E-9; DRG. NO. 59 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  4. Predicting Scour of Bedrock in Wisconsin

    DOT National Transportation Integrated Search

    2017-04-01

    This research evaluates the scour potential of rocks supporting Wisconsin DOT bridge foundations. Ten highway bridges were selected for this study, of which seven are supported by shallow foundations, and five were built on sandstone in rivers/stream...

  5. Design procedure for Bridge Foundations Subject to Liquefaction-Induced Lateral Spreading

    DOT National Transportation Integrated Search

    2017-04-01

    The response of piled bridge foundations to liquefaction-induced lateral soil deformation is an important design consideration in seismically active regions. Recent research and case history data suggest that three-dimensional deformation of the appr...

  6. Numerical Evaluation of Forces on Piled Bridge Foundations in Laterally Spreading Soil

    DOT National Transportation Integrated Search

    2017-04-01

    The response of piled bridge foundations to liquefaction-induced lateral soil deformation is an important design consideration in seismically active regions. Recent research and case history data suggest that three-dimensional deformation of the appr...

  7. 400. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    400. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; EAST BAY CROSSING; PIER E-6 TO E-23; TYPICAL DETAILS; DRG. NO. 52 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  8. Prevention of Bridge Scour with Non-uniform Circular Piers Plane under Steady Flows

    NASA Astrophysics Data System (ADS)

    Chen, Hsing-Ting; Wang, Chuan-Yi

    2017-04-01

    River bed scour and deposit variation extremely severe because of most of rivers are steep and rapid flows, and river discharge extremely unstable and highly unsteady during different seasons in Taiwan. In addition to the obstruction of piers foundation, it causes local scour and threatens the safety of bridges. In the past, riprap, wire gabion or wrap pier works were adopted as the protections of piers foundation, but there were no effectual outcomes. The events of break off piers still happen sometimes. For example, typhoon Kalmaegi (2008) and Morakot (2009) caused heavy damages on Ho-Fon bridge in the Da-jia river and Shuang-Yuan bridge in the Kao-Ping river, respectively. Accordingly, to understand the piers scour system and propose an appropriate protection of piers foundation becomes an important topic for this study currently. This research improves the protection works of the existing uniform bridge pier (diameter D) to ensure the safety of the bridge. The non-uniform plane of circular piers (diameter D*) are placed on the top of a bridge pier foundation to reduce the down flow impacting energy and scour by its' surface roughness characteristics. This study utilize hydraulic models to simulate local scour depth and scour depth change with time for non-uniform pier diameter ratio D/D* of 0.3,0.4,0.5,0.6,0.7 and 0.8, and different type pier and initial bed level (Y) relative under the foundation top elevation under steady flows of V/Vc=0.95,0.80 and 0.65. The research results show that the scour depth increases with an increase of flow intensity (V/Vc) under different types of steady flow hydrographs. The scour depth decreases with increase of initial bed level (Y=+0.2D*,0D*and -0.2D*) relative under the foundation top elevation of the different type pier. The maximum scour depth occurred in the front of the pier for all conditions. Because of the scouring retardation by the non-uniform plane of foundation, the scour depth is reduced for the un-exposed bridge foundation (Y=+0.2D*) under any steady flows. Opposite results are found for the exposed (Y=-0.2D*) bridge foundation. For the condition non-uniform pier diameter ratio (D/D*=0.3 0.8) scours, when D/D* is equal to 0.4, because pier oncoming flow area is the smallest one so that down flow intensity is less; as non-uniform area is bigger and decrease more down flow energy so that bring smaller scour depth and effect area. Therefore, local scour depth for pier diameter ratio of 0.4 is less than other type of pier. Considering the safety of bridge structure, a non-uniform circular pier with D/D* which equals to 0.4 and initial bed level relative to Y=+0.2D* is the most ideal pier allocations.

  9. 19. Photographer unknown, circa 1950 'THE LOOP OVER' BRIDGE WAS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photographer unknown, circa 1950 'THE LOOP OVER' BRIDGE WAS CONSTRUCTED ON NEWFOUND GAP ROAD TO REPLACE A SERIES OF DANGEROUS SWITCHBACKS. THIS ENGINEERING FEATURE QUICKLY BECAME A POPULAR TOURIST ATTRACTION. - Great Smoky Mountains National Park Roads & Bridges, Gatlinburg, Sevier County, TN

  10. 359. Delineator Unknown April 1935 STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    359. Delineator Unknown April 1935 STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; BRIDGE RAILWAY SAN FRANCISCO LOOP; DETAILS OF VIADUCT; FINAL REPORT; DRG. NO. 92 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  11. Geotechnical LFRD calculations of settlement and bearing capacity of GDOT shallow bridge foundations and retaining walls.

    DOT National Transportation Integrated Search

    2016-08-09

    The AASHTO codes for Load Resistance Factored Design (LRFD) regarding shallow bridge foundations : and walls have been implemented into a set of spreadsheet algorithms to facilitate the calculations of bearing : capacity and footing settlements on na...

  12. 413. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    413. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; DIVISION OF SAN FRANCISCO BAY TOLL CROSSINGS; SAN FRANCISCO OAKLAND BAY BRIDGE RECONSTRUCTION; STEEL WORK - WEST BAY; CONTINUOUS SPANS - LONGITUDINAL GIRDERS; SHEET NO. 18; DRAWING NO. C-4028-18R - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  13. 414. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    414. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; DIVISION OF SAN FRANCISCO BAY TOLL CROSSINGS; SAN FRANCISCO OAKLAND BAY BRIDGE RECONSTRUCTION; STEEL WORK - WEST BAY; TYPICAL SECTIONS; SHEET NO. 5; DRAWING NO. C-4028-5R - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  14. Phase I of roadmap towards incorporating intelligent structure technology for refining bridge inspection in Mississippi.

    DOT National Transportation Integrated Search

    2011-02-25

    "Bridge scour refers to the removal of sediments from the bridge foundation by flood. It is the most detrimental cause for the majority of : bridge failures in the United States. In the National Bridge Registry, there are 484,546 highway bridges over...

  15. Numerical Modeling of the Lake Mary Road Bridge for Foundation Reuse Assessment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sitek, M. A.; Bojanowski, C.; Lottes, S. A.

    This project uses numerical techniques to assess the structural integrity and capacity of the bridge foundations and, as a result, reduces the risk associated with reusing the same foundation for a new superstructure. Nondestructive test methods of different types were used in combination with the numerical modeling and analysis. The onsite tests included visual inspection, tomography, ground penetrating radar, drilling boreholes and coreholes, and the laboratory tests on recovered samples. The results were utilized to identify the current geometry of the structure with foundation, including the hidden geometry of the abutments and piers, and soil and foundation material properties. Thismore » data was used to build the numerical models and run computational analyses on a high performance computer cluster to assess the structural integrity of the bridge and foundations including the suitability of the foundation for reuse with a new superstructure and traffic that will increase the load on the foundations. Computational analysis is more cost-effective and gives an advantage of getting more detailed knowledge about the structural response. It also enables to go beyond non-destructive testing and find the failure conditions without destroying the structure under consideration.« less

  16. Developing a bridge scour warning system : technical summary.

    DOT National Transportation Integrated Search

    2016-09-01

    Flooding and scour can be major threats to the integrity of bridges. During flood events, : scour at bridge piers and abutments can undermine the foundations of the bridge, causing : significant damage or even total structure loss. Because scour occu...

  17. Developing a bridge scour warning system : final report.

    DOT National Transportation Integrated Search

    2016-09-01

    Flooding and scour can be major threats to the integrity of bridges. During flood events, scour at bridge piers : and abutments can undermine the foundations of the bridge, causing significant damage or even total structure loss. : Because scour occu...

  18. 415. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    415. Delineator Unknown Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; DIVISION OF SAN FRANCISCO BAY TOLL CROSSINGS; SAN FRANCISCO OAKLAND BAY BRIDGE RECONSTRUCTION; STEEL WORK - WEST BAY; Y.B. ANCHORAGE - FLOOR BEAMS YA-5 AND BENT 3; SHEET NO. 22; DRAWING NO. C-4028-22R - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  19. A novel abutment construction technique for rapid bridge construction : controlled low strength Materials (CLSM) with full-height concrete panels.

    DOT National Transportation Integrated Search

    2012-01-01

    One of the major obstacles facing rapid bridge construction for typical span type bridges is the time required to construct bridge abutments and foundations. This can be remedied by using the controlled low strength materials (CLSM) bridge abutment. ...

  20. Autonomous measurements of bridge pier and abutment scour using motion-sensing radio transmitters : technical transfer summary.

    DOT National Transportation Integrated Search

    2010-01-01

    Scour around the foundations (piers and abutments) of a bridge due to river flow is often referred to as bridge scour. Bridge scour is a problem of national scope that has dramatic impacts on economics and safety of the traveling public. Bridge...

  1. 38. Historic photograph, photographer unknown, c. 1944. VIEW SHOWING BURROS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Historic photograph, photographer unknown, c. 1944. VIEW SHOWING BURROS (OR MULES) CROSSING BRIDGE, LOOKING NORTHEAST. - Verde River Sheep Bridge, Spanning Verde River (Tonto National Forest), Cave Creek, Maricopa County, AZ

  2. Evaluation of design methods to determine scour depths for bridge structures.

    DOT National Transportation Integrated Search

    2013-03-01

    Scour of bridge foundations is the most common cause of bridge failures. The overall goal of this project was to evaluate the applicability of the existing Hydraulic Engineering Circular (HEC-18) documents method to Louisiana bridges that are mostly ...

  3. A Temperature-Based Monitoring System for Scour and Deposition at Bridge Piers

    DOT National Transportation Integrated Search

    2017-05-01

    Stream flows around a bridge pier can be fast and highly turbulent causing large shear stresses that may mobilize streambed sediment resulting in scour around bridge foundations. Scour is the leading cause of bridge failure in the USA because it comp...

  4. 43. Photocopy of photograph, photographer unknown, ca January 1929 (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. Photocopy of photograph, photographer unknown, ca January 1929 (original print located at Arizona Department of Transportation, Phoenix AZ). COMPLETED BRIDGE. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  5. 356. Delineator Unknown March 1946 STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    356. Delineator Unknown March 1946 STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; GENERAL DATA; PLAT III - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  6. Monitoring bridge scour using fiber optic sensors : [tech summary].

    DOT National Transportation Integrated Search

    2015-04-01

    It is well known that scour is one of the major causes of bridge failures. In the last 30 years, more than 1,000 bridges collapsed in : the US and about 60% of the failures are related to the scour of bridges foundations. Due to the difficulty in ...

  7. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...

  8. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...

  9. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...

  10. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...

  11. 23 CFR 650.805 - Bridges not requiring a USCG permit.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... OPERATIONS BRIDGES, STRUCTURES, AND HYDRAULICS Navigational Clearances for Bridges § 650.805 Bridges not... Engineers if the susceptibility to improvement for navigation of the water of concern is unknown and shall...

  12. Assessment and mitigation of liquefaction hazards to bridge approach embankments in Oregon : final report.

    DOT National Transportation Integrated Search

    2002-11-01

    The seismic performance of bridge structures and appurtenant components (i.e., approach spans, abutments and foundations) has been well documented following recent earthquakes worldwide. This experience demonstrates that bridges are highly vulnerable...

  13. 42. Photocopy of photograph, photographer unknown, 12 September 1928 (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. Photocopy of photograph, photographer unknown, 12 September 1928 (original print located at Arizona Department of Transportation, Phoenix AZ). BRIDGE IMMEDIATELY AFTER INSERTION OF CENTER PIN. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  14. Design and performance verification of UHPC piles for deep foundations.

    DOT National Transportation Integrated Search

    2008-11-01

    The strategic plan for bridge engineering issued by AASHTO in 2005 identified extending the service life and optimizing structural : systems of bridges in the United States as two grand challenges in bridge engineering, with the objective of producin...

  15. 44. Photocopy of photograph, photographer unknown, 1415 June 1929 (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photocopy of photograph, photographer unknown, 14-15 June 1929 (original print located at Utah State Historical Society Photograph Collection, Salt Lake City UT). DEDICATION CEREMONY AT BRIDGE. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  16. 45. Photocopy of photograph, photographer unknown, 1415 June 1929 (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. Photocopy of photograph, photographer unknown, 14-15 June 1929 (original print located at Arizona Department of Transportation, Phoenix AZ). AIRPLANE STUNT DURING DEDICATION CEREMONY AT BRIDGE. - Navajo Bridge, Spanning Colorado River at U.S. Highway 89 Alternate, Page, Coconino County, AZ

  17. Study of technology of pile foundation construction of no.5 main pier of Shoujiang bridge in Wenchuan County

    NASA Astrophysics Data System (ADS)

    Huang, Xianbin; Liu, Chenyang; Chen, Chunyang; Wangren, Yahong; Xu, Jialin; Xian, Jin

    2018-03-01

    The group of pile foundation of no.5 pier in Shoujiang Bridge needs to overcome the big load of large span continuous steel structure. The length of single pile foundation is 77m and the diameter of single pile foundation is 250cm. It not only faces the flood in the upstream of Shoujiang river, the construction obstacles during summer rain period, but also the reservoir clearance activity of Zipingpu reservoir and the high water level in winter and other water level fluctuation that have huge impact on platform of pile foundation construction. This article introduces the preparation in aspect of personnel, material, equipment and so on of pile foundation construction, and also conduct intensive research on leveling the field, assaying pile location, the embedment of the steel casing, installing the drill, mixing mud, drilling, final hole inspection and clearance, steel cage construction, perfusing concrete under water.

  18. 403. Delineator Unknown May 2, 1933 STUDY FOR SUSPENSION TOWERS; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    403. Delineator Unknown May 2, 1933 STUDY FOR SUSPENSION TOWERS; SAN FRANCISCO - OAKLAND BAY BRIDGE; TIMOTHY L. PFLUEGER, ARTHUR BROWN JR., JOHN J. DONOVAN; BOARD OF CONSULTING ARCHITECTS; SCHEME 2 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  19. 381. J.H.E., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    381. J.H.E., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; WEST BAY CROSSING; SUSPENDED STRUCTURE; ERECTION; DRG. NO. 43 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  20. 369. J.R.L., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    369. J.R.L., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; WEST BAY CROSSING; CAISSON ANCHORAGE; DRG. NO. 22 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  1. Boundary condition identification for a grid model by experimental and numerical dynamic analysis

    NASA Astrophysics Data System (ADS)

    Mao, Qiang; Devitis, John; Mazzotti, Matteo; Bartoli, Ivan; Moon, Franklin; Sjoblom, Kurt; Aktan, Emin

    2015-04-01

    There is a growing need to characterize unknown foundations and assess substructures in existing bridges. It is becoming an important issue for the serviceability and safety of bridges as well as for the possibility of partial reuse of existing infrastructures. Within this broader contest, this paper investigates the possibility of identifying, locating and quantifying changes of boundary conditions, by leveraging a simply supported grid structure with a composite deck. Multi-reference impact tests are operated for the grid model and modification of one supporting bearing is done by replacing a steel cylindrical roller with a roller of compliant material. Impact based modal analysis provide global modal parameters such as damped natural frequencies, mode shapes and flexibility matrix that are used as indicators of boundary condition changes. An updating process combining a hybrid optimization algorithm and the finite element software suit ABAQUS is presented in this paper. The updated ABAQUS model of the grid that simulates the supporting bearing with springs is used to detect and quantify the change of the boundary conditions.

  2. Evaluation of design methods to determine scour depths for bridge structures : [technical summary].

    DOT National Transportation Integrated Search

    2013-01-01

    Scour of bridge foundations is the most common cause of bridge failures. The Federal Highway Administration : (FHWA) has developed a design method, HEC-18, for the state Departments of Transportation (DOTs) to evaluate : the scour potential of existi...

  3. Synthesis and evaluation of the service limit state of engineered fills for bridge support.

    DOT National Transportation Integrated Search

    2016-02-02

    This report synthesizes the current service limit state (SLS) design and analyses of engineered fills for bridge support used as shallow foundations. The SLS for settlement and deformations of bridge supports are summarized. Extensive literature revi...

  4. 25. VIEW OF McGREGOR BRIDGE (18811936), CROSSING THE MERRIMACK RIVER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. VIEW OF McGREGOR BRIDGE (1881-1936), CROSSING THE MERRIMACK RIVER AT BRIDGE STREET, LOOKING SOUTHEAST. NORTH ELEVATION OF DOUBLE-DECKED, THREE-SPAN DOUGLAS PATENT PARABOLIC IRON TRUSS ERECTED BY CORRUGATED METAL COMPANY (BERLIN IRON BRIDGE COMPANY, BERLIN, CT) From 'Bridge Street Bridge', photographer and date unknown. - Notre Dame Bridge, Spanning Merrimack River on Bridge Street, Manchester, Hillsborough County, NH

  5. 402. Delineator Unknown May 2, 1933 STUDY FOR SUSPENSION TOWERS; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    402. Delineator Unknown May 2, 1933 STUDY FOR SUSPENSION TOWERS; SAN FRANCISCO - OAKLAND BAY BRIDGE; TIMOTHY L. PFLUEGER, ARTHUR BROWN JR., JOHN J. DONOVAN; BOARD OF CONSULTING ARCHITECTS; SCHEME 1A - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  6. 404. Delineator Unknown June 1, 1933 STUDY FOR TOP OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    404. Delineator Unknown June 1, 1933 STUDY FOR TOP OF SUSPENSION TOWERS; SAN FRANCISCO OAKLAND BAY BRIDGE; TIMOTHY L. PFLUEGER, ARTHUR BROWN JR., JOHN J. DONOVAN; BOARD OF CONSULTING ARCHITECTS; SCHEME 7-A - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  7. 380. Delineator Unknown December 1932 STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    380. Delineator Unknown December 1932 STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; CABLES & ATTACHMENTS WEST BAY CROSSING; CABLE BANDS; CONTRACT NO. 6A; DRAWING NO. 3 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  8. 389. J.H.E., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    389. J.H.E., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; WEST BAY CROSSING; SUSPENDED STRUCTURE; TYPICAL DETAILS; DRG. NO. 42 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  9. 366. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    366. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; WEST BAY CROSSING; SAN FRANCISCO CABLE BENT; DRG. NO. 33 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  10. 382. J.R.L., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    382. J.R.L., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; WEST BAY CROSSING; TOWERS; GENERAL ELEVATIONS & SECTIONS; DRG. NO. 28 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  11. 383. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    383. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; WEST BAY CROSSING; TOWERS; TYPICAL BASE DETAILS; DRG. NO. 29 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  12. 399. J.H.E., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    399. J.H.E., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; EAST BAY CROSSING; 504FOOT SPANS; TYPICAL DETAILS; DRG. NO. 64 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  13. 360. J.H.E., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    360. J.H.E., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; WEST BAY CROSSING; SAN FRANCISCO ANCHORAGE; TYPICAL SECTIONS; DRG. NO. 13 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  14. 391. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    391. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; EAST BAY CROSSING; PIER E1; GENERAL DETAILS; DRG. NO. 45 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  15. 395. J.L.E., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    395. J.L.E., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; EAST BAY CROSSING; TOWER E-4; GENERAL PLAN; DRG. NO. 58 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  16. 385. Delineator Unknown December 1932 STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    385. Delineator Unknown December 1932 STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; SUPERSTRUCTURE - WEST BAY CROSSING; ROCKER POSTS AND BEARING; CONTRACT NO. 6; DRAWINGS NO. 42 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  17. 361. W.J.M., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    361. W.J.M., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; WEST BAY CROSSING; SAN FRANCISCO ANCHORAGE; TYPICAL SECTIONS; DRG. NO. 14 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  18. 386. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    386. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; WEST BAY CROSSING; TOWERS; TYPICAL TOP DETAILS; DRG. NO. 31 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  19. 384. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    384. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; WEST BAY CROSSING; TOWERS; BRACING AND ROCKER BRACKET DETAILS; DRG. NO. 30 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  20. 379. Delineator Unknown December 1932 STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    379. Delineator Unknown December 1932 STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; CABLES AND ATTACHMENTS - WEST BAY CROSSING; SPLAY CASTINGS; CONTRACT NO. 6A; DRAWING NO. 4 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  1. 373. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    373. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; WEST BAY CROSSING; PIER W-4; DETAILS OF A-FRAME; DRG. NO. 19 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  2. 370. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    370. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; WEST BAY CROSSING; PIER W-4; PLANS AND ELEVATIONS; DRG. NO. 17 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  3. Calibration of load and resistance factors in LRFD foundation design specifications

    DOT National Transportation Integrated Search

    2011-02-01

    This report summarizes the findings and recommendations on the impact of foundation settlements on the reliability of bridge superstructures. As a collaborative effort of an overall initiative for the development of LRFD foundation design specificati...

  4. Project 2d: Calibration of Load and Resistance Factors in LRFD Foundation Design Specifications

    DOT National Transportation Integrated Search

    2011-02-01

    This report summarizes the findings and recommendations on the impact of foundation settlements on the reliability of bridge superstructures. As a : collaborative effort of an overall initiative for the development of LRFD foundation design specifica...

  5. 377. F.A.N. and Q.E.D., Delineators Date Unknown STATE OF CALIFORNIA; ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    377. F.A.N. and Q.E.D., Delineators Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; WEST BAY CROSSING; YERBA BUENA CABLE BENT; DRG. NO. 34 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  6. 390. Delineator Unknown October 1933 STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    390. Delineator Unknown October 1933 STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; SUPERSTRUCTURE - EAST BAY CROSSING; SPANS YBI TO El - E9 TO El ; TYPICAL CROSSSECTION; CONTRACT NO. 7; SUP. DRAWING NO. 82 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  7. 39. PORTAL ELEVATION. Photocopy of engraving from illustrated pamphlet titled ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. PORTAL ELEVATION. Photocopy of engraving from illustrated pamphlet titled 'Wrought Iron Bridges Built by Wrought Iron Bridge Company,' Wrought Iron Bridge Company, Canton, Ohio, 1885 (artist unknown). - Emlenton Bridge, Spanning Allegheny River, Travel Route 38 (Legislative Route 75), Emlenton, Venango County, PA

  8. Load and resistance factor design of bridge foundations accounting for pile group-soil interaction.

    DOT National Transportation Integrated Search

    2015-11-01

    Pile group foundations are used in most foundation solutions for transportation structures. Rigorous and reliable pile design methods are : required to produce designs whose level of safety (probability of failure) is known. By utilizing recently dev...

  9. Implementation of LRFD geotechnical design for deep foundations using Texas Cone Penetrometer (TCP) test.

    DOT National Transportation Integrated Search

    2015-09-01

    This study provides resistance factors (I) for design of deep foundations to implement Load and Resistance Factor Design (LRFD) for bridge foundations using Texas Cone Penetrometer (TCP) Test data. Initial efforts were made to determine resistance fa...

  10. Improved bridge joint materials and design details.

    DOT National Transportation Integrated Search

    2017-06-01

    Expansion joints accommodate bridge movements that result from factors such as thermal expansion and contraction, concrete shrinkage, creep effects, live loading, settlement of the foundation and substructure, and environmental stressors. Expansion j...

  11. Environmentally Friendly Solution to Ground Hazards in Design of Bridges in Earthquake Prone Areas Using Timber Piles

    NASA Astrophysics Data System (ADS)

    Sadeghi, H.

    2015-12-01

    Bridges are major elements of infrastructure in all societies. Their safety and continued serviceability guaranties the transportation and emergency access in urban and rural areas. However, these important structures are subject to earthquake induced damages in structure and foundations. The basic approach to the proper support of foundations are a) distribution of imposed loads to foundation in a way they can resist those loads without excessive settlement and failure; b) modification of foundation ground with various available methods; and c) combination of "a" and "b". The engineers has to face the task of designing the foundations meeting all safely and serviceability criteria but sometimes when there are numerous environmental and financial constrains, the use of some traditional methods become inevitable. This paper explains the application of timber piles to improve ground resistance to liquefaction and to secure the abutments of short to medium length bridges in an earthquake/liquefaction prone area in Bohol Island, Philippines. The limitations of using the common ground improvement methods (i.e., injection, dynamic compaction) because of either environmental or financial concerns along with the abundance of timber in the area made the engineers to use a network of timber piles behind the backwalls of the bridge abutments. The suggested timber pile network is simulated by numerical methods and its safety is examined. The results show that the compaction caused by driving of the piles and bearing capacity provided by timbers reduce the settlement and lateral movements due to service and earthquake induced loads.

  12. APPLICATION OF STEEL PIPE PILE LOADING TESTS TO DESIGN VERIFICATION OF FOUNDATION OF THE TOKYO GATE BRIDGE

    NASA Astrophysics Data System (ADS)

    Saitou, Yutaka; Kikuchi, Yoshiaki; Kusakabe, Osamu; Kiyomiya, Osamu; Yoneyama, Haruo; Kawakami, Taiji

    Steel sheet pipe pile foundations with large diameter steel pipe sheet pile were used for the foundation of the main pier of the Tokyo Gateway bridge. However, as for the large diameter steel pipe pile, the bearing mechanism including a pile tip plugging effect is still unclear due to lack of the practical examinations even though loading tests are performed on Trans-Tokyo Bay Highway. In the light of the foregoing problems, static pile loading tests both vertical and horizontal directions, a dynamic loading test, and cone penetration tests we re conducted for determining proper design parameters of the ground for the foundations. Design parameters were determined rationally based on the tests results. Rational design verification was obtained from this research.

  13. 401. J.W.P.C., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    401. J.W.P.C., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; EAST BAY CROSSING; PIERS E6 TO E-22; SEQUENCE OF OPERATION; DETAILS OF EQUIPMENT; DRG. NO. 53 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  14. 394. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    394. F.A.N., Delineator Date Unknown STATE OF CALIFORNIA; DEPARTMENT OF PUBLIC WORKS; SAN FRANCISCO - OAKLAND BAY BRIDGE; EAST BAY CROSSING; PIERS E-2, E-3, E-4, E-5; PLANT LAYOUT AND CAISSON ANCHORAGES; DRG. NO.51 - San Francisco Oakland Bay Bridge, Spanning San Francisco Bay, San Francisco, San Francisco County, CA

  15. Synthesis of concrete bridge piles prestressed with CFRP systems.

    DOT National Transportation Integrated Search

    2017-06-01

    The Texas Department of Transportation frequently constructs prestressed concrete piles for use in bridge : foundations. Such prestressed concrete piles are typically built with steel strands that are highly susceptible to : environmental degradation...

  16. 101. Pine Creek Bridge #7. It is the only parkway ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    101. Pine Creek Bridge #7. It is the only parkway bridge with steel arch piers and the only one whose piers are attached to its foundations with steel pins allowing it to flex without damaging the structure. Looking northeast. - Blue Ridge Parkway, Between Shenandoah National Park & Great Smoky Mountains, Asheville, Buncombe County, NC

  17. Environment Impact Analysis of Shield Passing Alongside Bridge Pile Platform Using Three Dimensional Numerical Simulation

    NASA Astrophysics Data System (ADS)

    Shang, Yanliang; Shi, Wenjun; Han, Tongyin; Qin, Zhichao; Du, Shouji

    2017-10-01

    The shield method has many advantages in the construction of urban subway, and has become the preferred method for the construction of urban subway tunnel. Taking Shijiazhuang metro line 3 (administrative center station - garden park station interval) Passing alongside bridge as the engineering background, double shield crossing the bridge pile foundation model was set up. The deformation and internal force of the pile foundation during the construction of the shield were analyzed. Pile stress caused by shield construction increases, but the maximum stress is less than the design strength; the maximum surface settlement caused by the construction of 10.2 mm, the results meet the requirements of construction.

  18. Lightweight solid decks for movable bridges : [summary].

    DOT National Transportation Integrated Search

    2016-04-01

    Florida International University researchers investigated a number of alternative bridge deck systems, which had been evaluated in prior research, to lay a complete foundation for further design and implementation procedures. The main objectives of t...

  19. 26. VIEW SHOWING SOUTH ELEVATION, LOOKING NORTHEAST From newspaper clipping, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    26. VIEW SHOWING SOUTH ELEVATION, LOOKING NORTHEAST From newspaper clipping, 'Notre Dame Bridge, Manchester, New Hampshire', Manchester Union Leader, c. 1938, photographer unknown. - Notre Dame Bridge, Spanning Merrimack River on Bridge Street, Manchester, Hillsborough County, NH

  20. Streambed scour evaluations and conditions at selected bridge sites in Alaska, 2013–15

    USGS Publications Warehouse

    Beebee, Robin A.; Dworsky, Karenth L.; Knopp, Schyler J.

    2017-12-27

    Streambed scour potential was evaluated at 52 river- and stream-spanning bridges in Alaska that lack a quantitative scour analysis or have unknown foundation details. All sites were evaluated for stream stability and long-term scour potential. Contraction scour and abutment scour were calculated for 52 bridges, and pier scour was calculated for 11 bridges that had piers. Vertical contraction (pressure flow) scour was calculated for sites where the modeled water surface was higher than the superstructure of the bridge. In most cases, hydraulic models of the 1- and 0.2-percent annual exceedance probability floods (also known as the 100- and 500-year floods, respectively) were used to derive hydraulic variables for the scour calculations. Alternate flood values were used in scour calculations for sites where smaller floods overtopped a bridge or where standard flood-frequency estimation techniques did not apply. Scour also was calculated for large recorded floods at 13 sites.Channel instability at 11 sites was related to human activities (in-channel mining, dredging, and channel relocation). Eight of the dredged sites are located on active unstable alluvial fans and were graded to protect infrastructure. The trend toward aggradation during major floods at these sites reduces confidence in scour estimates.Vertical contraction and pressure flow occurred during the 0.2-percent or smaller annual exceedance probability floods at eight sites. Contraction scour exceeded 5 feet (ft) at four sites, and total scour at piers (pier scour plus contraction scour) exceeded 5 ft at four sites. Debris accumulation increased calculated pier scour at six sites by an average of 2.4 ft. Total scour at abutments exceeded 5 ft at 10 sites. Scour estimates seemed excessive at two piers where equations did not account for channel armoring, and at four abutments where failure of the embankment and attendant channel widening would reduce scour.

  1. Analysis, inspection, and repair methods for pin connections on Illinois bridges

    DOT National Transportation Integrated Search

    1992-04-01

    This report documents methods used in Illinois for analysis, inspection, and repair of pin connections in bridges. Weldable foil strain gages were used to detect the effects of unknown levels of fixity in pins on cantilever truss bridges. Other metho...

  2. 12. Photocopy of bridge construction phonograph (from the collection of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photocopy of bridge construction phonograph (from the collection of Phil Bolmie, 17540 County Road 28, Colfax, North Dakota 58018; 701 553-8705) photographer unknown, 1917 views showing bridge under construction - Enloe Bridge No. 90021, Spanning Red River of North between Minnesota & North Dakota on County State Aid Highway 28, Wolverton, Wilkin County, MN

  3. 15. View looking N at foundation ruins of steam engine ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. View looking N at foundation ruins of steam engine and cane mill. - Hacienda Azucarera La Esperanza, Mill (Ruins), 2.65 miles North of PR Route 2 Bridge Over Manati River, Manati, Manati Municipio, PR

  4. 16. View looking E at foundation ruins of steam engine ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. View looking E at foundation ruins of steam engine and cane mill. - Hacienda Azucarera La Esperanza, Mill (Ruins), 2.65 miles North of PR Route 2 Bridge Over Manati River, Manati, Manati Municipio, PR

  5. 5. Detail view of masonry foundations and flue openings for ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Detail view of masonry foundations and flue openings for Jamaican Train. - Hacienda Azucarera El Coto, Sugar Mill Ruins, .5 Mi. SW of Rt. 347 Bridge Over Guanajibo River, San German, San German Municipio, PR

  6. Frozen soil lateral resistance for the seismic design of highway bridge foundations : [summary].

    DOT National Transportation Integrated Search

    2012-12-01

    With recent seismic activity and earthquakes in Alaska and throughout the Pacific Rim, seismic design is becoming an increasingly important public safety concern for : highway bridge designers. Hoping to generate knowledge that can improve the seismi...

  7. A feasibility study of bridge deck deicing using geothermal energy.

    DOT National Transportation Integrated Search

    2015-04-01

    In this study, we investigated the feasibility of a ground-coupled system that utilizes heat energy harvested from the ground for : deicing of bridge decks. Heat exchange is performed using circulation loops integrated into the deep foundations suppo...

  8. Hydraulic analysis of the Schoharie Creek bridge

    USGS Publications Warehouse

    Froehlich, David C.; Trent, Roy E.

    1989-01-01

    Ten people died on April 5, 1987 as a result of the collapse of two spans of a New York State Thruway bridge into the floodwaters of Schoharie Creek. The cause of the bridge failure was determined to be scour of bed material from under the foundations of piers supporting the bridge. To evaluate the hydraulic conditions that produced the scour, a two-dimensional finite element surface-water flow model was constructed. The model was used to obtain a detailed description of water-surface elevations and depth-averaged velocities within a reach that extends from about 4000 ft downstream of the bridge to about 6000 ft upstream of the bridge.

  9. Hydraulic Performance of Shallow Foundations for the Support of Vertical-Wall Bridge Abutments

    DOT National Transportation Integrated Search

    2017-02-01

    This study combined abutment flume experiments with numerical modeling using computational fluid dynamics (CFD) to investigate flow fields and scour at vertical-wall abutments with shallow foundations. The focus was situations dominated by flow contr...

  10. Determination of rheological parameters of pile foundations for bridges for earthquake analysis

    DOT National Transportation Integrated Search

    1997-07-01

    In the seismic design criteria for highway bridges, there is a significant lack of guidance on ways to incorporate the effect of soil-structure interaction in determining seismic response. For this study, a simple analytical model for pile and pile g...

  11. Multi-Hazard Assessment of Scour Damaged Bridges with UAS-Based Measurements

    NASA Astrophysics Data System (ADS)

    Özcan, O.; Ozcan, O.

    2017-12-01

    Flood and stream induced scour occurring in bridge piers constructed on rivers is one of the mostly observed failure reasons in bridges. Scour induced failure risk in bridges and determination of the alterations in bridge safety under seismic effects has the ultimate importance. Thus, for the determination of bridge safety under the scour effects, the scour amount under bridge piers should be designated realistically and should be tracked and updated continuously. Hereby, the scour induced failures in bridge foundation systems will be prevented and bridge substructure design will be conducted safely. In this study, in order to measure the amount of scour in bridge load bearing system (pile foundations and pile abutments) and to attain very high definition 3 dimensional models of river flood plain for the flood analysis, unmanned aircraft system (UAS) based measurement methods were implemented. UAS based measurement systems provide new and practical approach and bring high precision and reliable solutions considering recent measurement systems. For this purpose, the reinforced concrete (RC) bridge that is located on Antalya Boğaçayı River, Turkey and that failed in 2003 due to flood-induced scour was selected as the case study. The amount of scour occurred in bridge piers and piles was determined realistically and the behavior of bridge piers under scour effects was investigated. Future flood effects and the resultant amount of scour was determined with HEC-RAS software by using digital surface models that were obtained at regular intervals using UAS for the riverbed. In the light of the attained scour measurements and expected scour after a probable flood event, the behavior of scour damaged RC bridge was investigated by pushover and time history analyses under lateral and vertical seismic loadings. In the analyses, the load and displacement capacity of bridge was observed to diminish significantly under expected scour. Thus, the deterioration in multi hazard performance of the bridge was monitored significantly in the light of updated bridge load bearing system capacity. Regarding the case study, UAS based and continuously updated bridge multi hazard risk detection system was established that can be used for bridges located on riverbed.

  12. 82. DETAIL OF THE MUZZLE END OF THE LAUNCHER BRIDGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    82. DETAIL OF THE MUZZLE END OF THE LAUNCHER BRIDGE LOOKING NORTH SHOWING THE CONNECTING BRIDGE AND TWO LAUNCHING TUBES, Date unknown, circa 1952. (Original photograph in possession of Dave Willis, San Diego, California.) - Variable Angle Launcher Complex, Variable Angle Launcher, CA State Highway 39 at Morris Reservior, Azusa, Los Angeles County, CA

  13. State of the practice and art for structural health monitoring of bridge substructures.

    DOT National Transportation Integrated Search

    2014-05-01

    In an age of technological advances, the ability to monitor the performance of bridge foundations has evolved such that both short- and long-term data acquisition of embedded gauges is not only available but also cost effective. Case studies were doc...

  14. Development of a Database for Drilled SHAft Foundation Testing (DSHAFT).

    DOT National Transportation Integrated Search

    2012-06-01

    Drilled shafts have been used in the US for more than 100 years in bridges and buildings as a deep foundation alternative. For many of these applications, the drilled shafts were designed using the Working Stress Design (WSD) approach. Even though WS...

  15. Exploring the Science--Society Interface with a Bridging Research Course

    ERIC Educational Resources Information Center

    Boltax, Ariana L.; Kosinski-Collins, Melissa S.; Pontrello, Jason K.

    2016-01-01

    This article describes the development of a model for an optional, research-based course that bridges two existing, traditionally separate, introductory science courses. This research course provided freedom for students to design and implement new experiments on the basis of technical foundations built from enrollment in separate introductory…

  16. Investigation of pile setup (freeze) in Alabama : development of a setup prediction method and implementation into LRFD driven pile design.

    DOT National Transportation Integrated Search

    2015-06-01

    The Alabama Department of Transportation (ALDOT) often uses deep foundations : consisting of driven piles, particularly in the southern half of the state, to support bridges or other : highway structures. In the fiscal year 2012, a total of 22 bridge...

  17. 7. Photo copy of drawing, October 10, 1930. STATE BOARD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    7. Photo copy of drawing, October 10, 1930. STATE BOARD OF PUBLIC ROADS, BRIDGE DEPARTMENT, GREENWOOD R.R. BRIDGE, WARWICK, R.I., SECTIONS. Drawing no. unknown. Rhode Island State Department of Transportation, Smith Street, Providence, Rhode Island. - Greenwood Railroad Bridge, Post Road (U.S. Route 1) & Main Avenue over New Haven Railroad, Warwick, Kent County, RI

  18. 76 FR 1462 - Meetings of Humanities Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    ... THE NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES Meetings of Humanities Panel AGENCY: The... for the purpose of advising the agency, under the National Foundation on the Arts and the Humanities... Bridging Cultures Bookshelf project on the subject of Muslim history and cultures, including discussion of...

  19. Seismic performance and design of bridge foundations in liquefiable ground with a frozen crust : [summary].

    DOT National Transportation Integrated Search

    2012-12-01

    Two major earthquakes in Alaska, namely 1964 Great Alaskan earthquake and 2002 Denali earthquake, occurred in winter season when the ground crust was frozen. : None of the then-existing foundation types was able to withstand the force from the frozen...

  20. Seismic performance and design of bridge foundations in liquefiable ground with a frozen crust.

    DOT National Transportation Integrated Search

    2012-12-01

    Two major earthquakes in Alaska, namely 1964 Great Alaskan earthquake and 2002 Denali earthquake, occurred in winter season when the ground crust was frozen. None of the then-existing foundation types was able to withstand the force from the frozen c...

  1. Development of a Database for Drilled SHAft Foundation Testing (DSHAFT) : tech transfer summary.

    DOT National Transportation Integrated Search

    2012-06-01

    Drilled shafts have been used in the US for more than 100 years in bridges and buildings as a deep foundation alternative. For many of these applications, the drilled shafts were designed using the Working Stress Design (WSD) approach. Even though WS...

  2. Improving foundation design in rock : load test at Burma Road Overpass, final report, December 2009.

    DOT National Transportation Integrated Search

    2009-12-01

    This report describes the results of a bi-directional load test on a drilled shaft foundation in weak sandstone. The test was conducted in : conjunction with construction of a new bridge at Burma Road Overpass on I-90 in Gillette, Wyoming. The purpos...

  3. Development of LRFD procedures for bridge pile foundations in Iowa - volume III : recommended resistance factors with consideration of construction control and setup.

    DOT National Transportation Integrated Search

    2012-02-01

    The Federal Highway Administration (FHWA) mandated utilizing the Load and Resistance Factor Design (LRFD) approach for all new bridges initiated in the United States after October 1, 2007. As a result, there has been a progressive move among state De...

  4. Design of bridges against large tectonic deformation

    NASA Astrophysics Data System (ADS)

    Anastasopoulos, I.; Gazetas, G.; Drosos, V.; Georgarakos, T.; Kourkoulis, R.

    2008-12-01

    The engineering community has devoted much effort to understanding the response of soil-structure systems to seismic ground motions, but little attention to the effects of an outcropping fault offset. The 1999 earthquakes of Turkey and Taiwan, offering a variety of case histories of structural damage due to faulting, have (re)fueled the interest on the subject. This paper presents a methodology for design of bridges against tectonic deformation. The problem is decoupled in two analysis steps: the first (at the local level) deals with the response of a single pier and its foundation to fault rupture propagating through the soil, and the superstructure is modeled in a simplified manner; and the second (at the global level) investigates detailed models of the superstructure subjected to the support (differential) displacements of Step 1. A parametric study investigates typical models of viaduct and overpass bridges, founded on piles or caissons. Fixed-head piled foundations are shown to be rather vulnerable to faulting-induced deformation. End-bearing piles in particular are unable to survive bedrock offsets exceeding 10 cm. Floating piles perform better, and if combined with hinged pile-to-cap connections, they could survive much larger offsets. Soil resilience is beneficial in reducing pile distress. Caisson foundations are almost invariably successful. Statically-indeterminate superstructures are quite vulnerable, while statically-determinate are insensitive (allowing differential displacements and rotations without suffering any distress). For large-span cantilever-construction bridges, where a statically determinate system is hardly an option, inserting resilient seismic isolation bearings is advantageous as long as ample seating can prevent the deck from falling off the supports. An actual application of the developed method is presented for a major bridge, demonstrating the feasibility of design against tectonic deformation.

  5. 9. Photocopy of photograph (original print at Riverside Library, Local ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photocopy of photograph (original print at Riverside Library, Local History Collection), photographer unknown, ca. 1903-04. VIEW OF WORKERS AND BRIDGE UNDER CONSTRUCTION - Union Pacific Railroad Bridge, Spanning Santa Anna River, west of Riverside, Riverside, Riverside County, CA

  6. Effects of seismic devices on transverse responses of piers in the Sutong Bridge

    NASA Astrophysics Data System (ADS)

    Shen, Xing; Camara, Alfredo; Ye, Aijun

    2015-12-01

    The Sutong Bridge in China opened to traffic in 2008, and is an arterial connection between the cities of Nantong and Suzhou. It is a cable-stayed bridge with a main span of 1,088 m. Due to a tight construction schedule and lack of suitable seismic devices at the time, fixed supports were installed between the piers and the girder in the transverse direction. As a result, significant transverse seismic forces could occur in the piers and foundations, especially during a return period of a 2500-year earthquake. Therefore, the piers, foundations and fixed bearings had to be designed extraordinarily strong. However, when larger earthquakes occur, the bearings, piers and foundations are still vulnerable. The recent rapid developments in seismic technology and the performance-based design approach offer a better opportunity to optimize the transverse seismic design for the Sutong Bridge piers. The optimized design can be applied to the Sutong Bridge (as a retrofit), as well as other bridges. Seismic design alternatives utilizing viscous fluid dampers (VFD), or friction pendulum sliding bearings (FPSB), or transverse yielding metallic dampers (TYMD) are thoroughly studied in this work, and the results are compared with those from the current condition with fixed transverse supports and a hypothetical condition in which only sliding bearings are provided on top of the piers (the girder can move "freely" in the transverse direction during the earthquake, except for frictional forces of the sliding bearings). Parametric analyses were performed to optimize the design of these proposed seismic devices. From the comparison of the peak bridge responses in these configurations, it was found that both VFD and TYMD are very effective in the reduction of transverse seismic forces in piers, while at the same time keeping the relative transverse displacements between piers and the box girder within acceptable limits. However, compared to VFD, TYMD do not interact with the longitudinal displacements of the girder, and have simpler details and lower initial and maintenance costs. Although the use of FPSB can also reduce seismic forces, it generally causes the transverse relative displacements to be higher than acceptable limits.

  7. Bridge-in-a-Backpack(TM). Task 2.3 : low-rise arch study with soil-structure interaction and spread footing foundation.

    DOT National Transportation Integrated Search

    2015-01-01

    This report includes fulfillment of Task 2.3 of a multi-task contract to further enhance concrete filled FRP tubes, or : the Bridge in a Backpack. Task 2 is an investigation of alternative shapes for the FRP tubes with varying radii. Task : 2.3 explo...

  8. Research and Teaching: Association of Summer Bridge Program Outcomes with STEM Retention of Targeted Demographic Groups

    ERIC Educational Resources Information Center

    Tomasko, David L.; Ridgway, Judith S.; Waller, Rocquel J.; Olesik, Susan V.

    2016-01-01

    Retention of students to science, technology, engineering, and mathematics (STEM) major has been studied for four cohorts participating in a summer bridge program supported by the National Science Foundation. Students participated in a 6-week program prior to their first term of enrollment at a research-intensive land grant university. Comparisons…

  9. Study on the Old Girders in the Widening Hollow Slab Girder Bridge

    NASA Astrophysics Data System (ADS)

    Wang, Ying; Zhang, Li Fang; Ma, Hai Yan

    2018-06-01

    Taking the bridge widening project of Shanghai-Hangzhou-Ningbo expressway widening construction project (China) as the background in this paper, the variation law of the internal force of the old bridge in the widening hollow slab girder bridge under vehicle load is studied, which is under the condition of different span lengths and different widening widths. Three different span lengths of the pre-tensioned prestressed hollow slab girder bridges are selected, the spatial finite element models of both the old bridge and the whole structure of widening bridge are established and calculated respectively by Midas/Civil software. The influences of widening and load increasing on the old bridges under the vehicle load are compared and analyzed. In addition, the authors also analyze the influences of different widening widths on the force state of old bridges under the condition of widening the same number of lane. Moreover , the effects on the old bridges that are caused by the uneven foundation settlement of widening bridge structure are also studied in this paper. This paper can provide some references for widening design of hollow slab bridges.

  10. 20. San FranciscoOakland Bay Bridge contract recipients, April 28, 1933, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. San Francisco-Oakland Bay Bridge contract recipients, April 28, 1933, photographer unknown. Standing, left to right: Edward J. Schneider, Columbia Steel Corporation; C.C. Horton, Healy-Tibbitts Construction Company; Henry J. Kaiser, Bridge Builders, Inc.; Albert Huber, Clinton Construction Company; Allan McDonald, Transbay Construction Company; C.C. Carleton, Chief, Division of Contracts and Rights of Way, California Department of Public Works. Seated, left to right: Henry J. Brunnier, Consulting Engineer, Member of Consulting Board, San Francisco-Oakland Bay Bridge; Charles E. Andrew, Bridge Engineer, San Francisco-Oakland Bay Bridge; Earl Lee Kelly, Director, California Department of Public Works; Harrison S. Robinson, President, Financial ... - Salt River Bridge, Spanning Salt River at Dillon Road, Ferndale, Humboldt County, CA

  11. The Evolution of an Adolescent Literacy Program: A Foundation's Journey

    ERIC Educational Resources Information Center

    Henriquez, Andres

    2005-01-01

    The Carnegie Corporation of New York is associated with the very foundations of literacy going back to the philanthropy of Andrew Carnegie himself and of the Corporation in its early years. Andrew Carnegie's legacy includes over 2,500 free public libraries that he saw as a link "bridging ignorance and education." In fact, Carnegie, the…

  12. 9. Photocopy of photograph (original print at Riverside Library, Local ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    9. Photocopy of photograph (original print at Riverside Library, Local History Collection), photographer unknown, October 1916. FORMER 'VICTORIA BRIDGE' (HOWE DECK TRUSS SUPPORTED BY TRESTLE) LOOKING SOUTHWEST, SHOWING STREETCAR AND THATCH-ROOFED, CANTILEVERED PEDESTRIAN PLATFORM - Victoria Bridge, Spanning Tequesquite Arroyo, Riverside, Riverside County, CA

  13. 74. DETAIL VIEW OF INSIDE THE LAUNCHING BRIDGE LOOKING SOUTHWEST ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    74. DETAIL VIEW OF INSIDE THE LAUNCHING BRIDGE LOOKING SOUTHWEST SHOWING ADJUSTABLE STAIRS ON THE LEFT AND LAUNCHING TUBE ON THE RIGHT, Date unknown, circa 1948. - Variable Angle Launcher Complex, Variable Angle Launcher, CA State Highway 39 at Morris Reservior, Azusa, Los Angeles County, CA

  14. 18. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, SOUTH END SLUICEWAY, INTAKE CANAL BRIDGE, OPERATING HOUSE, AND MAIN BRIDGE, 6/18/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  15. The A.A.A.A. [American Association of Advertising Agencies] Educational Foundation Grants: Purpose, Results, Application; On the 22 Research Grants Awarded by the Foundation from 1968 through 1973, with Bibliographies of Published Material Which Resulted from the Research.

    ERIC Educational Resources Information Center

    Tinkham, Spencer F.

    The Educational Foundation of the American Association of Advertising Agencies was established by the Association's board to foster the accomplishment of six major goals: to create a bridge between advertising and university research, to attract top young people to the study of advertising, to raise the academic stature of advertising, to enlarge…

  16. Role to Be Played by Independent Geotechnical Supervision in the Foundation for Bridge Construction

    NASA Astrophysics Data System (ADS)

    Sobala, Dariusz; Rybak, Jarosław

    2017-10-01

    Some remarks concerning the necessity of employing an independent and over all ethical geotechnical survey were presented in the paper. Starting from the design phase, through the whole construction process, the importance of geotechnical engineer is stated in legal acts. Numerous testing technologies serve for the calibration of geotechnical technologies and allow for confirming the quality and capacity of piles. Special emphasis was payed to the involvement of scientifical and research institutions which can not only serve services but also can postprocess and methodize collected data. Such databases enable for new codes, methods and recommendations. Selection of deep foundations for bridge-type structures is most often dependent on complex geotechnical conditions, concentrated loads and constraints for pier displacements. Besides the last ones, prior to more common introduction of the design-construct system, could be a convenient justification for design engineer, who imposed deep foundation because he did not want or was not able to estimate the effect of pier settlement on civil engineering structure. The paper provides some notes about the need to engage a geotechnical supervising service of high competency and ethical quality during engineering and construction stages of foundations for bridge-type structures where legal requirements are of special consideration. Successive stages of projects are reviewed and research methods used for current calibration of geotechnical technologies and verification of geotechnical work quality are analysed. Special attention is given to potential involvement of independent R&D institutions which, apart from rendering specific services, also collect and systemize the research results thus enabling, in the long term, to revise engineering standards, instructions and guidelines.

  17. Development of Virtual Resource Based IoT Proxy for Bridging Heterogeneous Web Services in IoT Networks.

    PubMed

    Jin, Wenquan; Kim, DoHyeun

    2018-05-26

    The Internet of Things is comprised of heterogeneous devices, applications, and platforms using multiple communication technologies to connect the Internet for providing seamless services ubiquitously. With the requirement of developing Internet of Things products, many protocols, program libraries, frameworks, and standard specifications have been proposed. Therefore, providing a consistent interface to access services from those environments is difficult. Moreover, bridging the existing web services to sensor and actuator networks is also important for providing Internet of Things services in various industry domains. In this paper, an Internet of Things proxy is proposed that is based on virtual resources to bridge heterogeneous web services from the Internet to the Internet of Things network. The proxy enables clients to have transparent access to Internet of Things devices and web services in the network. The proxy is comprised of server and client to forward messages for different communication environments using the virtual resources which include the server for the message sender and the client for the message receiver. We design the proxy for the Open Connectivity Foundation network where the virtual resources are discovered by the clients as Open Connectivity Foundation resources. The virtual resources represent the resources which expose services in the Internet by web service providers. Although the services are provided by web service providers from the Internet, the client can access services using the consistent communication protocol in the Open Connectivity Foundation network. For discovering the resources to access services, the client also uses the consistent discovery interface to discover the Open Connectivity Foundation devices and virtual resources.

  18. Smart Rocks for Bridge Scour Monitoring: Design and Localization Using Electromagnetic Techniques and Embedded Orientation Sensors

    NASA Astrophysics Data System (ADS)

    Radchenko, Andro

    River bridge scour is an erosion process in which flowing water removes sediment materials (such as sand, rocks) from a bridge foundation, river beds and banks. As a result, the level of the river bed near a bridge pier is lowering such that the bridge foundation stability can be compromised, and the bridge can collapse. The scour is a dynamic process, which can accelerate rapidly during a flood event. Thus, regular monitoring of the scour progress is necessary to be performed at most river bridges. Present techniques are usually expensive, require large man/hour efforts, and often lack the real-time monitoring capabilities. In this dissertation a new method--'Smart Rocks Network for bridge scour monitoring' is introduced. The method is based on distributed wireless sensors embedded in ground underwater nearby the bridge pillars. The sensor nodes are unconstrained in movement, are equipped with years-lasting batteries and intelligent custom designed electronics, which minimizes power consumption during operation and communication. The electronic part consists of a microcontroller, communication interfaces, orientation and environment sensors (such as are accelerometer, magnetometer, temperature and pressure sensors), supporting power supplies and circuitries. Embedded in the soil nearby a bridge pillar the Smart Rocks can move/drift together with the sediments, and act as the free agent probes transmitting the unique signature signals to the base-station monitors. Individual movement of a Smart Rock can be remotely detected processing the orientation sensors reading. This can give an indication of the on-going scour progress, and set a flag for the on-site inspection. The map of the deployed Smart Rocks Network can be obtained utilizing the custom developed in-network communication protocol with signals intensity (RSSI) analysis. Particle Swarm Optimization (PSO) is applied for map reconstruction. Analysis of the map can provide detailed insight into the scour progress and topology. Smart Rocks Network wireless communication is based on the magnetoinductive (MI) link, at low (125 KHz) frequency, allowing for signal to penetrate through the water, rocks, and the bridge structure. The dissertation describes the Smart Rocks Network implementation, its electronic design and the electromagnetic/computational intelligence techniques used for the network mapping.

  19. Computational Fluid Dynamic Analysis of Hydrodynamic forces on inundated bridge decks

    NASA Astrophysics Data System (ADS)

    Afzal, Bushra; Guo, Junke; Kerenyi, Kornel

    2010-11-01

    The hydraulic forces experienced by an inundated bridge deck have great importance in the design of bridges. Flood flows or hurricane add significant hydrodynamic loading on bridges, possibly resulting in failure of the bridge superstructures. The objective of the study is to establish validated computational practice to address research needs of the transportation community via computational fluid dynamic simulations. The reduced scale experiments conducted at Turner-Fairbank Highway Research Center establish the foundations of validated computational practices to address the research needs of the transportation community. Three bridge deck prototypes were used: a typical six-girder highway bridge deck, a three-girder deck, and a streamlined deck designed to better withstand the hydraulic forces. Results of the study showed that the streamlined deck significantly reduces drag, lift, and moment coefficient in comparison to the other bridge deck types. The CFD results matched the experimental data in terms of the relationship between inundation ratio and force measured at the bridge. The results of the present research will provide a tool for designing new bridges and retrofitting old ones.

  20. Combining Mineral Identification Techniques to Help Homeowners of Northeastern Connecticut Diagnose Pyrrhotite Laced Concrete Foundations

    NASA Astrophysics Data System (ADS)

    Gourley, J. R.; Geiss, C. E.

    2017-12-01

    Crumbling concrete linked to the mineral pyrrhotite is an emerging home owner crisis in northeastern Connecticut as new home foundations are failing within only several years. Potentially thousands of homes that have been built between the mid 1980's and 2016 are affected. Homes have been rendered worthless as basement concrete is crumbling and the cost of repair often exceeds the value of the home. In all of the failing concrete cases the presence of pyrrhotite from a local quarry is the common denominator. Testing for pyrrhotite, until now, has been costly and often invasive, with large core samples required. In working with a local advocacy group, The Connecticut Coalition Against Crumbling Basements (CCACB), we have developed a rapid analysis method that uses a combination of magnetic susceptibility and high resolution X-ray diffraction to identify both the mineral pyrrhotite and/or its expansive product mineral, ettringite. The goal of this method to give homeowners a reliable diagnosis that could help in mitigation decisions and/or the determination of the resale value of their homes. The partnership of Trinity College's Environmental Science Program with the CCACB has built a rewarding bridge between education and the community. Faculty, students and local advocates are collaborating to solve a problem that will help homeowners diagnose a potentially devastating non-natural "geo" hazard that can adversely affect home values where concrete is of an unknown provenance.

  1. Acoustic Emission Monitoring for Assessment of Steel Bridge Details

    NASA Astrophysics Data System (ADS)

    Kosnik, D. E.; Hopwood, T.; Corr, D. J.

    2011-06-01

    Acoustic emission (AE) testing was deployed on details of two large steel Interstate Highway bridges: one cantilever through-truss and one trapezoidal box girder bridge. Quantitative measurements of activity levels at known and suspected crack locations were made by monitoring AE under normal service loads (e.g., live traffic and wind). AE indications were used to direct application of radiography, resulting in identification of a previously unknown flaw, and to inform selection of a retrofit detail.

  2. 14. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, CONSTRUCTION BRIDGE PIERS - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  3. 14. Photocopy of photograph original print located at University Archives, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. Photocopy of photograph original print located at University Archives, Hayden Library, Arizona State University, Tempe, Arizona. Photographer unknown, 1902 VIEW SHOWING TRAIN WRECK ON MARICOPA AND PHOENIX RAILROAD CAUSED BY BRIDGE FAILURE RESULTING FROM FLOOD DAMAGE - Ash Avenue Bridge, Spanning Salt River at Foot of Ash Avenue, Tempe, Maricopa County, AZ

  4. New Insights into Family Learning for Refugees: Bonding, Bridging and Building Transcultural Capital

    ERIC Educational Resources Information Center

    Hope, Julia

    2011-01-01

    For over 20 years, researchers and evaluators worldwide have criticised the traditional formula of family learning courses for their narrow vision, and have emphasised their potential to provide a bridge between home and school experiences, building on resources that parents already have, but which are unknown or unacknowledged. This article…

  5. 83. DETAIL OF THE MUZZLE END OF THE LAUNCHER BRIDGE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    83. DETAIL OF THE MUZZLE END OF THE LAUNCHER BRIDGE ON TEMPORARY SUPPORTS LOOKING NORTHEAST SHOWING TWO LAUNCHING TUBES, Date unknown, circa 1950'S. (Original photograph in possession of Dave Willis, San Diego, California.) - Variable Angle Launcher Complex, Variable Angle Launcher, CA State Highway 39 at Morris Reservior, Azusa, Los Angeles County, CA

  6. Solvent-Exposed Salt Bridges Influence the Kinetics of α-Helix Folding and Unfolding.

    PubMed

    Meuzelaar, Heleen; Tros, Martijn; Huerta-Viga, Adriana; van Dijk, Chris N; Vreede, Jocelyne; Woutersen, Sander

    2014-03-06

    Salt bridges are known to play an essential role in the thermodynamic stability of the folded conformation of many proteins, but their influence on the kinetics of folding remains largely unknown. Here, we investigate the effect of Glu-Arg salt bridges on the kinetics of α-helix folding using temperature-jump transient-infrared spectroscopy and steady-state UV circular dichroism. We find that geometrically optimized salt bridges (Glu - and Arg + are spaced four peptide units apart, and the Glu/Arg order is such that the side-chain rotameric preferences favor salt-bridge formation) significantly speed up folding and slow down unfolding, whereas salt bridges with unfavorable geometry slow down folding and slightly speed up unfolding. Our observations suggest a possible explanation for the surprising fact that many biologically active proteins contain salt bridges that do not stabilize the native conformation: these salt bridges might have a kinetic rather than a thermodynamic function.

  7. Impact of Underwater Explosions on Concrete Bridge Foundations

    DTIC Science & Technology

    2016-06-01

    www.theconstructioncivil.org/ [16] M. Aggour, A. Hachichi and M. Mayer, “Nondestructive evaluation of timber bridge piles,” in Proceedings of a Session a Structure Congress...detonation must be executed a safe distance from any critical infrastructure to ensure the survivability of the structure . This thesis implements...be executed a safe distance from any critical infrastructure to ensure the survivability of the structure . This thesis implements the Dynamic System

  8. 19. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, CANAL BRIDGE, OPERATING HOUSE AND INTAKE, SOUTH END, 2/14/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  9. 16. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    16. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol, I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, SHOWING WEIR APRONS AND BRIDGE, 6/18/25. - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  10. 15. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    15. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, CONSTRUCTION BRIDGE DECK, 4/5/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  11. Flood scour monitoring system using fiber Bragg grating sensors

    NASA Astrophysics Data System (ADS)

    Lin, Yung Bin; Lai, Jihn Sung; Chang, Kuo Chun; Li, Lu Sheng

    2006-12-01

    The exposure and subsequent undermining of pier/abutment foundations through the scouring action of a flood can result in the structural failure of a bridge. Bridge scour is one of the leading causes of bridge failure. Bridges subject to periods of flood/high flow require monitoring during those times in order to protect the traveling public. In this study, an innovative scour monitoring system using button-like fiber Bragg grating (FBG) sensors was developed and applied successfully in the field during the Aere typhoon period in 2004. The in situ FBG scour monitoring system has been demonstrated to be robust and reliable for real-time scour-depth measurements, and to be valid for indicating depositional depth at the Dadu Bridge. The field results show that this system can function well and survive a typhoon flood.

  12. 30. Photocopy of blueprint. PLAN, ELEVATION, END SECTION, DETAIL OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. Photocopy of blueprint. PLAN, ELEVATION, END SECTION, DETAIL OF DECK SYSTEM AND LOAD COMPUTATION. Preparer unknown, date unknown, but probably ca. 1932. (Original in possession of the Washington County Highway Department.) - Hegeman-Hill Street Bridge, Spanning Batten Kill, .65 mile West of Greenwich, Easton, Washington County, NY

  13. 28. VIEW TO NORTHEAST. VIEW OVER TOP OF TRUSS FROM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. VIEW TO NORTHEAST. VIEW OVER TOP OF TRUSS FROM CONTROL CABIN DECK. Photographer unknown, August 1947 (Note that frame for electrical power cables is still in place, though the bridge was converted to hand operation almost ten years earlier.) - Gianella Bridge, Spanning Sacramento River at State Highway 32, Hamilton City, Glenn County, CA

  14. 12. Photocopy of antique postcard. (Original postcard is in the ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photocopy of antique postcard. (Original postcard is in the possession of the Venice Branch of the Los Angeles Public Library, publisher/photographer unknown.) VIEW OF PRE-EXISTING GRAND CANAL COURT PEDESTRIAN BRIDGE OVER CARROLL CANAL, LOOKING EAST TOWARD DELL AVENUE VEHICULAR BRIDGE - Venice Canals, Community of Venice, Los Angeles, Los Angeles County, CA

  15. 57. INTERIOR VIEW OF VAL BRIDGE STRUCTURE SHOWING LAUNCHING TUBE, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    57. INTERIOR VIEW OF VAL BRIDGE STRUCTURE SHOWING LAUNCHING TUBE, STAIRS AND PORTION OF LAUNCHING DECK. NOTE SUPPORT CARRIAGE ASSEMBLY IN DISTANCE. Date unknown, circa March 1948. (Original photograph in possession of Dave Willis, San Diego, California.) - Variable Angle Launcher Complex, Variable Angle Launcher, CA State Highway 39 at Morris Reservior, Azusa, Los Angeles County, CA

  16. 26 CFR 1.263A-8 - Requirement to capitalize interest.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... must include anticipated expense and time for delay, rework, change orders, and technological, design..., roads, bridges, tunnels, paved parking areas and other pavements, special foundations, wharves and docks...

  17. 49. Neg. No. 7268C, ca. 1930, PhotographerUnknown, OVERALL VIEW OF ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    49. Neg. No. 7268C, ca. 1930, Photographer-Unknown, OVERALL VIEW OF THE FORD MOTOR COMPANY ASSEMBLY PLANT FROM THE HENRY FORD BRIDGE, PRIOR TO CONSTRUCTION OF THE PRESSED STEEL BUILDING - Ford Motor Company Long Beach Assembly Plant, Assembly Building, 700 Henry Ford Avenue, Long Beach, Los Angeles County, CA

  18. Photographic copy Photograph of 1892 drawing by artist H.W. Locket. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy Photograph of 1892 drawing by artist H.W. Locket. Original Photographer Unknown. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. EARLY DESIGN OF “DOUBLE TRACK RAILROAD BRIDGE OVER MISSISSIPPI RIVER ABOVE THE CITY OF NEW ORLEANS, LA, U.S.A. TO BE BUILT BY SOUTHERN BRIDGE AND RAILWAY COMPANY”. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  19. Photographic copy of undated 12” x 36” pen and ink ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of undated 12” x 36” pen and ink drawing by Modjeski, Masters and Chase, Bridge Engineers. Illustrator Unknown. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. PEN AND INK DRAWING OF FINAL PROPOSAL OF “BRIDGE OVER THE MISSISSIPPI RIVER, NEW ORLEANS, LA.” - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  20. Photographic copy of circa 1934, 10” x 15”, black and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa 1934, 10” x 15”, black and white aerial photograph. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. AERIAL PHOTOGRAPH OF BRIDGE UNDER CONSTRUCTION FROM WEST BANK LOOKING NORTH TOWARD EAST BANK DOWN RIVER SHOWING OVERALL VIEW OF BRIDGE PIER CONSTRUCTION. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  1. Photographic copy of early 20” x 33”, black and white ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of early 20” x 33”, black and white photograph. Located loose in oversized box at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. EARLY PHOTOGRAPH OF BRIDGE TAKEN FROM DOWN RIVER NEAR EAST BANK LOOKING SOUTHWEST UP RIVER TOWARD WEST BANK SHOWING STEAM LOCOMOTIVE TRAIN CROSSING BRIDGE. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  2. Methodology and Estimates of Scour at Selected Bridge Sites in Alaska

    USGS Publications Warehouse

    Heinrichs, Thomas A.; Kennedy, Ben W.; Langley, Dustin E.; Burrows, Robert L.

    2001-01-01

    The U.S. Geological Survey estimated scour depths at 325 bridges in Alaska as part of a cooperative agreement with the Alaska Department of Transportation and Public Facilities. The department selected these sites from approximately 806 State-owned bridges as potentially susceptible to scour during extreme floods. Pier scour and contraction scour were computed for the selected bridges by using methods recommended by the Federal Highway Administration. The U.S. Geological Survey used a four-step procedure to estimate scour: (1) Compute magnitudes of the 100- and 500-year floods. (2) Determine cross-section geometry and hydraulic properties for each bridge site. (3) Compute the water-surface profile for the 100- and 500-year floods. (4) Compute contraction and pier scour. This procedure is unique because the cross sections were developed from existing data on file to make a quantitative estimate of scour. This screening method has the advantage of providing scour depths and bed elevations for comparison with bridge-foundation elevations without the time and expense of a field survey. Four examples of bridge-scour analyses are summarized in the appendix.

  3. Engineering policy guidelines for design of spread footings.

    DOT National Transportation Integrated Search

    2011-10-01

    These guidelines were developed as part of a comprehensive research program undertaken by the Missouri Department of Transportation (MoDOT) to reduce costs associated with design and construction of bridge foundations while maintaining appropriate le...

  4. Engineering policy guidelines for design of drilled shafts.

    DOT National Transportation Integrated Search

    2011-10-01

    These guidelines were developed as part of a comprehensive research program undertaken by the Missouri Department of Transportation (MoDOT) to reduce costs associated with design and construction of bridge foundations while maintaining appropriate le...

  5. Engineering policy guidelines for design of driven piles.

    DOT National Transportation Integrated Search

    2011-08-01

    These guidelines were developed as part of a comprehensive research program undertaken by the Missouri Department of : Transportation (MoDOT) to reduce costs associated with design and construction of bridge foundations while maintaining appropriate ...

  6. Engineering policy guidelines for design of earth slopes.

    DOT National Transportation Integrated Search

    2011-10-01

    These guidelines were developed as part of a comprehensive research program undertaken by the Missouri Department of Transportation (MoDOT) to reduce costs associated with design and construction of bridge foundations while maintaining appropriate le...

  7. Engineering policy guidelines for design of earth slopes.

    DOT National Transportation Integrated Search

    2011-08-01

    These guidelines were developed as part of a comprehensive research program undertaken by the Missouri Department of : Transportation (MoDOT) to reduce costs associated with design and construction of bridge foundations while maintaining appropriate ...

  8. Engineering policy guidelines for design of spread footings.

    DOT National Transportation Integrated Search

    2011-08-01

    These guidelines were developed as part of a comprehensive research program undertaken by the Missouri Department of : Transportation (MoDOT) to reduce costs associated with design and construction of bridge foundations while maintaining appropriate ...

  9. Engineering policy guidelines for design of drilled shafts.

    DOT National Transportation Integrated Search

    2011-08-01

    These guidelines were developed as part of a comprehensive research program undertaken by the Missouri Department of : Transportation (MoDOT) to reduce costs associated with design and construction of bridge foundations while maintaining appropriate ...

  10. Geo-infrastructure damage assessment, repair and mitigation strategies.

    DOT National Transportation Integrated Search

    2013-09-01

    The 2011 Missouri River flooding caused significant damage to many geo-infrastructure systems including levees, bridge : abutments/foundations, paved and unpaved roadways, culverts, and embankment slopes in western Iowa. The flooding resulted in : cl...

  11. An HF coaxial bridge for measuring impedance ratios up to 1 MHz

    NASA Astrophysics Data System (ADS)

    Kucera, J.; Sedlacek, R.; Bohacek, J.

    2012-08-01

    A four-terminal pair coaxial ac bridge developed for calibrating both resistance and capacitance ratios and working in the frequency range from 100 kHz up to 1 MHz is described. A reference inductive voltage divider (IVD) makes it possible to calibrate ratios 1:1 and 10:1 with uncertainty of a few parts in 105. The IVD is calibrated by means of a series-parallel capacitance device (SPCD). Use of the same ac bridge with minimal changes for calibrating the SPCD, IVD and unknown impedances simplifies the whole calibration process. The bridge balance conditions are fulfilled with simple capacitance and resistance decades and by injecting voltage supplied from the auxiliary direct digital synthesizer. Bridge performance was checked on the basis of resistance ratio measurements and also capacitance ratio measurements.

  12. The universal existence of myodural bridge in mammals: an indication of a necessary function.

    PubMed

    Zheng, Nan; Yuan, Xiao-Ying; Chi, Yan-Yan; Liu, Pei; Wang, Bing; Sui, Jia-Ying; Han, Seung-Ho; Yu, Sheng-Bo; Sui, Hong-Jin

    2017-08-15

    The "myodural bridge" was described in literatures as a dense fibrous tissue connecting the sub-occipital musculature with the spinal dura mater in human studies. Now the concept of "myodural bridge" was perceived as an exact anatomical structure presumably essential for critical physiological functions in human body, and might exist in other mammals as well. To determine the existence of the "myodural bridge" in other mammals and to lay a foundation for the functional study, we examined representatives in five different mammalian orders. Based on the anatomical dissections, P45 plastinated sections and histological sections, we found that a dense fibrous tissue connected the rectus capitisdorsalis minor and the spinal dura mater through the dorsal atlanto-occipital interspace with or without the medium of the posterior atlanto-occipital membrane. These observed connective tissues were very similar to the "myodural bridge" previously described in humans. We proposed that the "myodural bridge", as an evolutionally conserved structure, presents in many other mammals. Moreover, we believed that the "myodural bridge" might be a homologous organ in mammals. Thus, this study could provide an insight for our understanding the physiological significance of the "myodural bridge", especially in human.

  13. 29. Photocopy of photograph. VIEW, LOOKING NORTHEAST, OF NORTHEAST SECTION ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Photocopy of photograph. VIEW, LOOKING NORTHEAST, OF NORTHEAST SECTION OF THE STRUCTURE, SHOWING ORIGINAL WOOD DECK, RAILING AND EARLY 1930'S PACKARD AUTOMOBILE IN BACKGROUND. Photographer unknown, date unknown. (Print in possession of the Washington County Highway Department). - Hegeman-Hill Street Bridge, Spanning Batten Kill, .65 mile West of Greenwich, Easton, Washington County, NY

  14. Solving the Unknown with Algebra: Poster/Teaching Guide for Pre-Algebra Students. Expect the Unexpected with Math[R

    ERIC Educational Resources Information Center

    Actuarial Foundation, 2013

    2013-01-01

    "Solving the Unknown with Algebra" is a new math program aligned with the National Council of Teachers of Mathematics (NCTM) standards and designed to help students practice pre-algebra skills including using formulas, solving for unknowns, and manipulating equations. Developed by The Actuarial Foundation with Scholastic, this program provides…

  15. Investigation of carbon fiber composite cables (CFCC) in prestressed concrete piles.

    DOT National Transportation Integrated Search

    2014-04-01

    The Florida Department of Transportation (FDOT) commonly uses prestressed concrete piles in : bridge foundations. These piles are prestressed with steel strands that, when installed in aggressive or : marine environments, are subject to corrosion and...

  16. Evaluation of scour potential of cohesive soils - phase 2.

    DOT National Transportation Integrated Search

    2015-01-01

    Determination of erosion parameters in order to predict scour depth is imperative to designing safe, : economic, and efficient bridge foundations. Scour behavior of granular soils is generally understood, : and design criteria have been established b...

  17. Minimizing the effects of pile driving vibrations : research spotlight.

    DOT National Transportation Integrated Search

    2013-11-01

    Engineers must take care that the vibrations from pile driving : operations during bridge construction do not damage underground : utilities or cause settlement in the foundations of nearby structures. : In this project, researchers developed a simpl...

  18. Behavior of drilled shafts with high-strength reinforcement and casing.

    DOT National Transportation Integrated Search

    2015-09-01

    Drilled shafts provide significant geotechnical resistance for support of highway bridges, and are used throughout the States of Oregon : and Washington to meet their structural foundation requirements. Due to changes in construction methods and poor...

  19. Bridging different perspectives of the physiological and mathematical disciplines.

    PubMed

    Batzel, Jerry Joseph; Hinghofer-Szalkay, Helmut; Kappel, Franz; Schneditz, Daniel; Kenner, Thomas; Goswami, Nandu

    2012-12-01

    The goal of this report is to discuss educational approaches for bridging the different perspectives of the physiological and mathematical disciplines. These approaches can enhance the learning experience for physiology, medical, and mathematics students and simultaneously act to stimulate mathematical/physiological/clinical interdisciplinary research. While physiology education incorporates mathematics, via equations and formulas, it does not typically provide a foundation for interdisciplinary research linking mathematics and physiology. Here, we provide insights and ideas derived from interdisciplinary seminars involving mathematicians and physiologists that have been conducted over the last decade. The approaches described here can be used as templates for giving physiology and medical students insights into how sophisticated tools from mathematics can be applied and how the disciplines of mathematics and physiology can be integrated in research, thereby fostering a foundation for interdisciplinary collaboration. These templates are equally applicable to linking mathematical methods with other life and health sciences in the educational process.

  20. Experimental design to measure the anchoring energy on substrate surface by using the alternating-current bridge

    NASA Astrophysics Data System (ADS)

    Hao, Hui-Ming; Liu, Yao-Yao; Zhang, Ping; Cai, Ming-Lei; Wang, Xiao-Yan; Zhu, Ji-Liang; Ye, Wen-Jiang

    2017-08-01

    Not Available Project supported by the National Natural Science Foundation of China (Grant Nos. 11374087 and 11504080), the Natural Science Foundation of Hebei Province, China (Grant Nos. A2014202123 and A2017202004), the Research Project of the Education Department of Hebei Province, China (Grant No. QN2014130), the Key Subject Construction Project of Hebei Provincial University, and the Undergraduate Innovation and Entrepreneurship Training Program, China (Grant No. 201610080016).

  1. Gross anatomical study on the human myocardial bridges with special reference to the spatial relationship among coronary arteries, cardiac veins, and autonomic nerves.

    PubMed

    Watanabe, Yuko; Arakawa, Takamitsu; Kageyama, Ikuo; Aizawa, Yukio; Kumaki, Katsuji; Miki, Akinori; Terashima, Toshio

    2016-04-01

    Coronary arteries are frequently covered by cardiac muscles. This arrangement is termed a myocardial bridge. Previous studies have shown that myocardial bridges can cause myocardial ischemic diseases or cardiac arrhythmia, but the relevant pathogenic mechanisms remain unknown. We examined 60 hearts from Japanese cadavers macroscopically to clarify the spatial relationships among coronary arteries, cardiac veins and autonomic nerves. We found 86 myocardial bridges in 47 hearts from the 60 cadavers examined (78.3%). Next, we dissected out nine hearts with myocardial bridges in detail under the operating microscope. We found no additional branches of coronary arteries on the myocardial bridge surfaces. However, the cardiac veins, which usually accompany the coronary arteries, ran independently on the myocardial bridge surfaces in the same region. Cardiac autonomic nerves comprised two rami: one was associated with the coronary artery under the myocardial bridge and the other ran on the surface of the bridge. Such spatial relationships among the coronary arteries, cardiac veins and cardiac autonomic nerves at the myocardial bridges are quite similar to those in mouse embryo hearts. © 2015 Wiley Periodicals, Inc.

  2. Photographic copy of circa 1934, 10” x 15”, black and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa 1934, 10” x 15”, black and white aerial photograph. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. AERIAL PHOTOGRAPH OF BRIDGE UNDER CONSTRUCTION LOOKING SOUTH FROM EAST BANK TOWARD WEST BANK SHOWING COMPLETED STEEL RAIL SECTION AND PART OF BRIDGE DECK TRUSS UNDER CONSTRUCTION. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  3. Photographic copy of circa 1935, black and white, 10” x ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa 1935, black and white, 10” x 14” photograph. Located in box 14 of Huey P. Long Bridge folder (Greater New Orleans), at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. PHOTOGRAPH OF COMPLETED BRIDGE TAKEN IN CENTER LOOKING SOUTHEAST AT EAST BANK SINGLE THROUGH TRUSS SPAN SHOWING PERIOD AUTOMOBILE AND WOMAN ON BICYCLE WEST BOUND. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  4. Durability performance of submerged concrete structures - phase 2 : [summary].

    DOT National Transportation Integrated Search

    2015-10-01

    Thousands of Florida bridges have steel-reinforced concrete piling foundations standing : in salt water. Over time, chloride ions in the water can migrate through the concrete to : attack the steel inside. The Florida Department of Transportation (FD...

  5. Geo-infrastructure post-flood damage assessment, repair and mitigation strategies : tech transfer summary.

    DOT National Transportation Integrated Search

    2013-09-01

    The 2011 Missouri river flooding caused damage to many geoinfrastructure : systems including levees, bridge abutments/foundations, : paved and unpaved roadways, culverts, and embankment slopes in : western Iowa. The total reported direct cost to repa...

  6. Prediction of pile set-up for Ohio soils.

    DOT National Transportation Integrated Search

    2011-02-01

    ODOT typically uses small diameter driven pipe piles for bridge foundations. When a pile is driven into the subsurface, it disturbs and displaces the soil. As the soil surrounding the pile recovers from the installation disturbance, a time dependant ...

  7. Field testing of jet-grouted pile : [summary].

    DOT National Transportation Integrated Search

    2014-01-01

    In many areas of Florida, local geology dictates the use of deep foundations for transportation structures bridges, noise walls, signage, etc. When concrete piles are used, they are either prestressed at the casting yard, cast in situ through a h...

  8. Investigation of carbon fiber composite cables (CFCC) in prestressed concrete piles : [summary].

    DOT National Transportation Integrated Search

    2014-04-01

    FDOT commonly uses concrete piles prestressed : with steel strands in bridge foundations due to : their economy of design, fabrication, and : installation. However, when installed in marine : environments, the steel strands are prone to : corrosion a...

  9. 50 ksi steel h-pile capacity.

    DOT National Transportation Integrated Search

    2015-06-01

    The objective of this study is to re-evaluate the adoption, with the objective of potentially extending the utilization of Fy = 50 ksi for : the structural capacity of steel H-piles (AISC HP sections) for bridge foundations. Specific consideration is...

  10. Quantum Logic Networks for Probabilistic and Controlled Teleportation of Unknown Quantum States

    NASA Astrophysics Data System (ADS)

    Gao, Ting

    2004-08-01

    We present simplification schemes for probabilistic and controlled teleportation of the unknown quantum states of both one particle and two particles and construct efficient quantum logic networks for implementing the new schemes by means of the primitive operations consisting of single-qubit gates, two-qubit controlled-not gates, Von Neumann measurement, and classically controlled operations. In these schemes the teleportation are not always successful but with certain probability. The project supported by National Natural Science Foundation of China under Grant No. 10271081 and the Natural Science Foundation of Hebei Province of China under Grant No. A2004000141

  11. Unraveling Structural Infrasound: understanding the science for persistent remote monitoring of critical infrastructure (Invited)

    NASA Astrophysics Data System (ADS)

    McKenna, S. M.; Diaz-Alvarez, H.; McComas, S.; Costley, D.; Whitlow, R. D.; Jordan, A. M.; Taylor, O.

    2013-12-01

    In 2006, the Engineer Research and Development Center (ERDC) began a program designed to meet the capability gap associated with remote assessment of critical infrastructure. This program addresses issues arising from the use of geophysical techniques to solve engineering problems through persistent monitoring of critical infrastructure using infrasound. In the original 2006-2009 study of a railroad bridge in Ft. Leonard Wood, MO, the fundamental modes of motion of the structure were detected at up to 30 km away, with atmospheric excitation deemed to be the source driver. Follow-on research focused on the mechanically driven modes excited by traffic, with directional acoustic emanations. The success of the Ft. Wood ambient excitation study resulted in several subsequent programs to push the boundaries of this new technique for standoff assessment, discussed herein. Detection of scour and river system health monitoring are serious problems for monitoring civil infrastructure, from both civilian and military perspectives. Knowledge of overall system behavior over time is crucial for assessment of bridge foundations and barge navigation. This research focuses on the same steel-truss bridge from the Ft. Wood study, and analyzes 3D and 2D substructure models coupled with the superstructure reaction loads to assess the modal deformations within the infrasound bandwidth and the correlation to scour of embedment material. The Urban infrasound program is infrasound modeling, data analysis, and sensor research leading to the detection, classification and localization of threat activities in complex propagation environments. Three seismo-acoustic arrays were deployed on rooftops across the Southern Methodist University campus in Dallas, Texas, to characterize the urban infrasound environment. Structural sources within 15 km of the arrays have been identified through signal processing and confirmed through acoustical models. Infrasound is also being studied as a means of structural impact assessment. The Interstate-20 Mississippi River Bridge in Vicksburg, MS is a 7 span, cantilever bridge. On March 23, 2011, a barge moving downstream struck a pier of the bridge. Infrasound stations located approximately 4.5 km away detected the impact. Coincidentally, ERDC had instrumented the bridge with strain gages and accelerometers as part of a structural health monitoring project. Finite Element (FE) models were developed to investigate the structural behavior of the bridge due to the impact, with experimental data and FE models validating source mechanism of the infrasound from the bridge. Health assessment of large dams, whether for flood control or power generation, is critical for both civilian and military applications. Ambient excitations can induce measurable responses in the dam, adjacent foundation and in the reservoir, some of which are in the infrasound passband. The Portugues Dam outside of Ponce, Puerto Rico, is being investigated. Currently in the final stages of construction, infrasound array data collections over all four seasons before and after the opening of the dam will provide a seasonally variable database, begun in July 2013. Impulsive excitation using an instrumented Cold Gas thruster (CGT) instrumented with a dynamic force sensor induces transient frequency responses in the dam, reservoir, and along the dam-foundation interface below 20 Hz, to allow for controlled source validation.

  12. Predicting scour in weak rock of the Oregon Coast Range : final report

    DOT National Transportation Integrated Search

    1999-10-01

    Recent experience in the Coast Range Province of Oregon demonstrates that weak sedimentary bedrock in stream channels can be vulnerable to scour. The presence of erodible rock adjacent to bridge foundations and abutments necessitates monitoring of th...

  13. Design of inclined loaded drilled shafts in high-plasticity clay environment.

    DOT National Transportation Integrated Search

    2011-05-01

    Drilled shaft foundations are principally used to support many structures such as bridge piers, towers, : buildings, transmission towers, and roadway cable barriers. This research focuses on the use of drilled shafts : in the cable median barrier sys...

  14. Philosophical Foundations for Curriculum Decision: A Reflective Analysis

    ERIC Educational Resources Information Center

    Belbase, Shashidhar

    2011-01-01

    This paper discusses the author's curriculum experiences under different philosophical, epistemological and theoretical backdrops. The analysis of different perspectives bridges epistemological and philosophical/theoretical lenses to my understanding of curriculum and different curricular decisions. This praxeological experience as a student and…

  15. A Combined Experimental and Numerical Modeling Study of the Deformation and Rupture of Axisymmetric Liquid Bridges under Coaxial Stretching.

    PubMed

    Zhuang, Jinda; Ju, Y Sungtaek

    2015-09-22

    The deformation and rupture of axisymmetric liquid bridges being stretched between two fully wetted coaxial disks are studied experimentally and theoretically. We numerically solve the time-dependent Navier-Stokes equations while tracking the deformation of the liquid-air interface using the arbitrary Lagrangian-Eulerian (ALE) moving mesh method to fully account for the effects of inertia and viscous forces on bridge dynamics. The effects of the stretching velocity, liquid properties, and liquid volume on the dynamics of liquid bridges are systematically investigated to provide direct experimental validation of our numerical model for stretching velocities as high as 3 m/s. The Ohnesorge number (Oh) of liquid bridges is a primary factor governing the dynamics of liquid bridge rupture, especially the dependence of the rupture distance on the stretching velocity. The rupture distance generally increases with the stretching velocity, far in excess of the static stability limit. For bridges with low Ohnesorge numbers, however, the rupture distance stay nearly constant or decreases with the stretching velocity within certain velocity windows due to the relative rupture position switching and the thread shape change. Our work provides an experimentally validated modeling approach and experimental data to help establish foundation for systematic further studies and applications of liquid bridges.

  16. Photographic copy of early black and white photograph. Located loose ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of early black and white photograph. Located loose in oversized box at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. EARLY PHOTOGRAPH OF BRIDGE TAKEN FROM WEST BANK APPROACH LOOKING NORTH TOWARD EAST BANK. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  17. 20. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1926. Vol. I, Narrative and Photographs, RG 75, Entry 655, Box 29, National Archives, Washington, DC.) Photographer unknown. SACATON DAM, BRIDGE FROM SOUTH END, 8/29/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  18. Overlap microtubules link sister k-fibres and balance the forces on bi-oriented kinetochores

    PubMed Central

    Kajtez, Janko; Solomatina, Anastasia; Novak, Maja; Polak, Bruno; Vukušić, Kruno; Rüdiger, Jonas; Cojoc, Gheorghe; Milas, Ana; Šumanovac Šestak, Ivana; Risteski, Patrik; Tavano, Federica; Klemm, Anna H.; Roscioli, Emanuele; Welburn, Julie; Cimini, Daniela; Glunčić, Matko; Pavin, Nenad; Tolić, Iva M.

    2016-01-01

    During metaphase, forces on kinetochores are exerted by k-fibres, bundles of microtubules that end at the kinetochore. Interestingly, non-kinetochore microtubules have been observed between sister kinetochores, but their function is unknown. Here we show by laser-cutting of a k-fibre in HeLa and PtK1 cells that a bundle of non-kinetochore microtubules, which we term ‘bridging fibre', bridges sister k-fibres and balances the interkinetochore tension. We found PRC1 and EB3 in the bridging fibre, suggesting that it consists of antiparallel dynamic microtubules. By using a theoretical model that includes a bridging fibre, we show that the forces at the pole and at the kinetochore depend on the bridging fibre thickness. Moreover, our theory and experiments show larger relaxation of the interkinetochore distance for cuts closer to kinetochores. We conclude that the bridging fibre, by linking sister k-fibres, withstands the tension between sister kinetochores and enables the spindle to obtain a curved shape. PMID:26728792

  19. The inverse problem for definition of the shape of a molten contact bridge

    NASA Astrophysics Data System (ADS)

    Kharin, Stanislav N.; Sarsengeldin, Merey M.

    2017-09-01

    The paper presents the results of investigation of bridging phenomenon occurring at opening of electrical contacts. The mathematical model describing the dynamics of metal molten bridge takes into account the Thomson effect. It is based on the system of partial differential equations for temperature and electrical fields of the bridge in the domain containing two moving unknown boundaries. One of them is an interface between liquid and solid zones of the bridge and should be found by the solution of the corresponding Stefan problem. The second free boundary corresponds to the shape of the visible part of a bridge. Its definition is an inverse problem, for which solution it is necessary to find minimum of the energy consuming for the formation of the shape of a quasi-stationary bridge. Three components of this energy, namely surface tension, pinch effect and gravitation, are defined by the functional which minimum gives the required shape of the bridge. The solution of corresponding variation problem is found by the reduction of the problem to the solution of the system of ordinary differential equations. Calculated values of the voltage of the bridge rupture for various metals are in a good agreement with the experimental data. The criteria responsible for the mechanism of molten bridge rupture are introduced in the paper.

  20. Random vibration analysis of train-bridge under track irregularities and traveling seismic waves using train-slab track-bridge interaction model

    NASA Astrophysics Data System (ADS)

    Zeng, Zhi-Ping; Zhao, Yan-Gang; Xu, Wen-Tao; Yu, Zhi-Wu; Chen, Ling-Kun; Lou, Ping

    2015-04-01

    The frequent use of bridges in high-speed railway lines greatly increases the probability that trains are running on bridges when earthquakes occur. This paper investigates the random vibrations of a high-speed train traversing a slab track on a continuous girder bridge subjected to track irregularities and traveling seismic waves by the pseudo-excitation method (PEM). To derive the equations of motion of the train-slab track-bridge interaction system, the multibody dynamics and finite element method models are used for the train and the track and bridge, respectively. By assuming track irregularities to be fully coherent random excitations with time lags between different wheels and seismic accelerations to be uniformly modulated, non-stationary random excitations with time lags between different foundations, the random load vectors of the equations of motion are transformed into a series of deterministic pseudo-excitations based on PEM and the wheel-rail contact relationship. A computer code is developed to obtain the time-dependent random responses of the entire system. As a case study, the random vibration characteristics of an ICE-3 high-speed train traversing a seven-span continuous girder bridge simultaneously excited by track irregularities and traveling seismic waves are analyzed. The influence of train speed and seismic wave propagation velocity on the random vibration characteristics of the bridge and train are discussed.

  1. Prediction of pile set-up for Ohio soils : executive summary report.

    DOT National Transportation Integrated Search

    2011-02-01

    ODOT typically uses small diameter driven pipe piles for bridge foundations. When a pile is driven into the subsurface, it disturbs and displaces the soil. As the soil surrounding the pile recovers from the installation disturbance, a time dependant ...

  2. Embedded data collector (EDC) evaluation, phase II - comparison with instrumented static load tests : [technical summary].

    DOT National Transportation Integrated Search

    2013-12-01

    Monitoring installation of driven pile foundations : is critically important to ensure adequate safety : of structures with piles, such as the many bridges : which are maintained by the Florida Department : of Transportation (FDOT). Dynamic load test...

  3. 26 CFR 1.897-1 - Taxation of foreign investment in United States real property interests, definition of terms.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... parking areas and other pavements, special foundations for heavy equipment, wharves and docks, bridges... to real property; (2) Whether the property was designed to be easily removable or to remain in place...

  4. 26 CFR 1.897-1 - Taxation of foreign investment in United States real property interests, definition of terms.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... parking areas and other pavements, special foundations for heavy equipment, wharves and docks, bridges... to real property; (2) Whether the property was designed to be easily removable or to remain in place...

  5. 26 CFR 1.897-1 - Taxation of foreign investment in United States real property interests, definition of terms.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... parking areas and other pavements, special foundations for heavy equipment, wharves and docks, bridges... to real property; (2) Whether the property was designed to be easily removable or to remain in place...

  6. 26 CFR 1.897-1 - Taxation of foreign investment in United States real property interests, definition of terms.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... parking areas and other pavements, special foundations for heavy equipment, wharves and docks, bridges... to real property; (2) Whether the property was designed to be easily removable or to remain in place...

  7. 26 CFR 1.897-1 - Taxation of foreign investment in United States real property interests, definition of terms.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... parking areas and other pavements, special foundations for heavy equipment, wharves and docks, bridges... to real property; (2) Whether the property was designed to be easily removable or to remain in place...

  8. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1935, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. APRIL 15, 1935 PHOTOGRAPH NO. 92 OF CONTRACT NO. 4 SHOWING BRIDGE SUPERSTRUCTURE GENERAL VIEW OF BRIDGE. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  9. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1935, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. MARCH 11, 1935 PHOTOGRAPH NO. 83A OF CONTRACT NO. 4 SHOWING BRIDGE SUPERSTRUCTURE GENERAL VIEW OF BRIDGE. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  10. 17. Photographic copy of photograph. Location unknown but assumed to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photographic copy of photograph. Location unknown but assumed to be uper end of canal. Features no longer extant. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. MAIN (TITLED FLORENCE) CANAL, WASTEWAY, SLUICEWAY, & BRIDGE, 1/26/25. - San Carlos Irrigation Project, Marin Canal, Amhurst-Hayden Dam to Picacho Reservoir, Coolidge, Pinal County, AZ

  11. Geological hazards associated with intense rain and flooding in Natal

    NASA Astrophysics Data System (ADS)

    Thomas, M. A.; van Schalkwyk, A.

    1993-02-01

    The combination of rugged topography and climate predisposes the province of Natal to severe floods. Information available since 1856 shows that bridge and slope failures have been recorded in twenty out of twenty-five flood episodes. Bridge failures are caused mostly by geological factors. The mechanism of failure can be classified broadly into foundation failures and changes of river course. Scour and debris build-up have led to failures of foundations located in rock and alluvial sediments. In preparing and replacing bridges the aims have been to increase the area of waterway, increase foundation depths to reach more competent strata and lay protection along banks and abutments to counteract scour. Historically, slope failures have not been well documented but following the 1987/88 storms 223 slope failures were recorded. The classification of the failures allowed the mechanisms of failure to be ascertained, and general design considerations to be reviewed. In areas adjacent to the Drakensberg Mountains slope failures are part of a natural erosion cycle which may be accelerated in periods of heavy rain. Throughout Natal, hummocky ground adjacent to dolerite intrusions reveals the on-going history of failure caused by water ingress and the generation of high pore water pressures on the slip planes. Classic flows occurred throughout the Greater Durban area where residual sandy soils of the Natal Group sandstone became supersaturated. Slumping was common on steep terrain underlain by granite-gneiss in the Kwa-Zulu area. Shales of the Pietermaritzburg Formation are notoriously unstable, yet few failures occurred during the summer storms of 1987/88. Inadequate drainage was responsible for many failures, this was particularly so along the railways.

  12. Real-time seismic monitoring of the integrated cape girardeau bridge array and recorded earthquake response

    USGS Publications Warehouse

    Celebi, M.

    2006-01-01

    This paper introduces the state of the art, real-time and broad-band seismic monitoring network implemented for the 1206 m [3956 ft] long, cable-stayed Bill Emerson Memorial Bridge in Cape Girardeau (MO), a new Mississippi River crossing, approximately 80 km from the epicentral region of the 1811-1812 New Madrid earthquakes. The bridge was designed for a strong earthquake (magnitude 7.5 or greater) during the design life of the bridge. The monitoring network comprises a total of 84 channels of accelerometers deployed on the superstructure, pier foundations and at surface and downhole free-field arrays of the bridge. The paper also presents the high quality response data obtained from the network. Such data is aimed to be used by the owner, researchers and engineers to assess the performance of the bridge, to check design parameters, including the comparison of dynamic characteristics with actual response, and to better design future similar bridges. Preliminary analyses of ambient and low amplitude small earthquake data reveal specific response characteristics of the bridge and the free-field. There is evidence of coherent tower, cable, deck interaction that sometimes results in amplified ambient motions. Motions at the lowest tri-axial downhole accelerometers on both MO and IL sides are practically free from any feedback from the bridge. Motions at the mid-level and surface downhole accelerometers are influenced significantly by feedback due to amplified ambient motions of the bridge. Copyright ASCE 2006.

  13. Removal of failed crown and bridge

    PubMed Central

    Rahul, G R.; Poduval, Soorya T.; Shetty, Karunakar

    2012-01-01

    Crown and bridge have life span of many years but they fail for a number of reasons. Over the years, many devices have been designed to remove crowns and bridges from abutment teeth. While the removal of temporary crowns and bridges is usually very straightforward, the removal of a definitive cast crown with unknown cement is more challenging. Removal is often by destructive means. There are a number of circumstances, however, in which conservative disassembly would aid the practitioner in completing restorative/endodontic procedures. There are different mechanisms available to remove a failed crown or bridge. But there is no information published about the classification of available systems for crown and bridge removal. So it is logical to classify these systems into different groups which can help a clinician in choosing a particular type of system depending upon the clinical situation. The aim of this article is to provide a classification for various crown and bridge removal systems; describe how a number of systems work; and when and why they might be used. A PubMed search of English literature was conducted up to January 2010 using the terms: Crown and bridge removal, Crown and bridge disassembly, Crown and bridge failure. Additionally, the bibliographies of 3 previous reviews, their cross references as well as articles published in various journals like International Endodontic Journal, Journal of Endodontics and were manually searched. Key words:Crown and bridge removal, Crown and bridge disassembly, Crown and bridge failure. PMID:24558549

  14. Athletic Trainers' Current Knowledge and Envisioned Use of Foundational Evidence-Based Practice Concepts

    ERIC Educational Resources Information Center

    Manspeaker, Sarah A.; Hankemeier, Dorice A.

    2017-01-01

    Context: The Board of Certification (BOC) requires 10 continuing education units (CEUs) in evidence-based practice (EBP) each reporting period. It is unknown whether participation in programming in the Foundations category for CEUs results in improved knowledge of and confidence in EBP. Objective: To examine a continuing professional education…

  15. Domain Decomposition: A Bridge between Nature and Parallel Computers

    DTIC Science & Technology

    1992-09-01

    B., "Domain Decomposition Algorithms for Indefinite Elliptic Problems," S"IAM Journal of S; cientific and Statistical (’omputing, Vol. 13, 1992, pp...AD-A256 575 NASA Contractor Report 189709 ICASE Report No. 92-44 ICASE DOMAIN DECOMPOSITION: A BRIDGE BETWEEN NATURE AND PARALLEL COMPUTERS DTIC dE...effectively implemented on dis- tributed memory multiprocessors. In 1990 (as reported in Ref. 38 using the tile algo- rithm), a 103,201-unknown 2D elliptic

  16. Ultra-wideband impedance sensor

    DOEpatents

    McEwan, Thomas E.

    1999-01-01

    The ultra-wideband impedance sensor (UWBZ sensor, or Z-sensor) is implemented in differential and single-ended configurations. The differential UWBZ sensor employs a sub-nanosecond impulse to determine the balance of an impedance bridge. The bridge is configured as a differential sample-and-hold circuit that has a reference impedance side and an unknown impedance side. The unknown impedance side includes a short transmission line whose impedance is a function of the near proximity of objects. The single-ended UWBZ sensor eliminates the reference side of the bridge and is formed of a sample and hold circuit having a transmission line whose impedance is a function of the near proximity of objects. The sensing range of the transmission line is bounded by the two-way travel time of the impulse, thereby eliminating spurious Doppler modes from large distant objects that would occur in a microwave CW impedance bridge. Thus, the UWBZ sensor is a range-gated proximity sensor. The Z-sensor senses the near proximity of various materials such as metal, plastic, wood, petroleum products, and living tissue. It is much like a capacitance sensor, yet it is impervious to moisture. One broad application area is the general replacement of magnetic sensors, particularly where nonferrous materials need to be sensed. Another broad application area is sensing full/empty levels in tanks, vats and silos, e.g., a full/empty switch in water or petroleum tanks.

  17. Ultra-wideband impedance sensor

    DOEpatents

    McEwan, T.E.

    1999-03-16

    The ultra-wideband impedance sensor (UWBZ sensor, or Z-sensor) is implemented in differential and single-ended configurations. The differential UWBZ sensor employs a sub-nanosecond impulse to determine the balance of an impedance bridge. The bridge is configured as a differential sample-and-hold circuit that has a reference impedance side and an unknown impedance side. The unknown impedance side includes a short transmission line whose impedance is a function of the near proximity of objects. The single-ended UWBZ sensor eliminates the reference side of the bridge and is formed of a sample and hold circuit having a transmission line whose impedance is a function of the near proximity of objects. The sensing range of the transmission line is bounded by the two-way travel time of the impulse, thereby eliminating spurious Doppler modes from large distant objects that would occur in a microwave CW impedance bridge. Thus, the UWBZ sensor is a range-gated proximity sensor. The Z-sensor senses the near proximity of various materials such as metal, plastic, wood, petroleum products, and living tissue. It is much like a capacitance sensor, yet it is impervious to moisture. One broad application area is the general replacement of magnetic sensors, particularly where nonferrous materials need to be sensed. Another broad application area is sensing full/empty levels in tanks, vats and silos, e.g., a full/empty switch in water or petroleum tanks. 2 figs.

  18. Investigation and development of an effective, economical and efficient concrete pile splice.

    DOT National Transportation Integrated Search

    2015-06-01

    Structures such as bridges or tall buildings often require deep foundations in order to reach soil or rock strata capable of resisting the associated high loads. In Florida, concrete elements such as driven piles, drilled shafts or other cast-in-plac...

  19. Continuous flight auger pile bridge foundation : Implementation Phase I : Texas Gulf Coast Region : final report.

    DOT National Transportation Integrated Search

    2004-01-01

    Continuous flight auger (CFA) piles better known as Augered, Cast In-Place (ACIP) piles have been widely used in the United States for several decades because of relatively rapid installation and minimum environmental impact during installation with ...

  20. Drilled shaft bridge foundation design parameters and procedures for bearing in SGC soils.

    DOT National Transportation Integrated Search

    2006-04-01

    This report provides a simplified method to be used for evaluating the skin friction and tip resistance of : axially loaded drilled shafts. A summary of literature and current practice was completed and then a : comprehensive set of field and laborat...

  1. Building bridges between the physical and biological sciences.

    PubMed

    Ninham, B W; Boström, M

    2005-12-16

    This paper attempts to identify major conceptual issues that have inhibited the application of physical chemistry to problems in the biological sciences. We will trace out where theories went wrong, how to repair the present foundations, and discuss current progress toward building a better dialogue.

  2. Bridge pier foundation evaluation using cross-hole seismic tomographic imaging

    NASA Astrophysics Data System (ADS)

    Butchibabu, B.; Sandeep, N.; Sivaram, Y. V.; Jha, P. C.; Khan, P. K.

    2017-09-01

    An ambitious project connecting Jammu and Srinagar through a railway link in tectonically active and geologically complex Himalayan Mountain terrain is under progress. Under this project, the world's highest (359 m) railway arch-bridge is under construction across the River Chenab in the northern territory of India. This mega engineering structure has a two-fold ribbed arch design, comprising of steel girders. During the excavation for one of the concrete pillars on the right abutment, wide open joints and weak/shear zones were noticed. The width of these joints varies from 30 to 50 cm, trending along N170° with a dip of 65°. The foundation area of this pillar is 13 m × 24 m and on the cut slopes of the right bank of Chenab River. These exposed joints and weak zones were treated with consolidation grouting to strengthen the foundation area. To delineate the extent of these joints and weak zones below the foundation level, seismic tomography was carried out in five boreholes drilled for this purpose to cover the 300 sq-m area. The results of cross-hole seismic tomography reveals the presence of three low velocity (≤ 2600 m/s) anomalous zones below the foundation area. This also ascertained the efficacy of grouting in consolidating the joints and weak zones. Later, rock-mass quality (Q) was determined based on the relationship between the P-wave velocity and the Q-value (Barton, 2002) to infer the support system for the slope stabilization below the foundation. 3-D visualization of the seismic velocity demarcates the extent of weak or untreated zones. This methodology facilitates to update the design parameters according to Q-values during the construction stage and estimate the required level of reinforcement and support system. Similar methodology can be applicable in other areas under same site conditions.

  3. Optimal Conclusive Teleportation of an Arbitrary d-Dimensional N-Particle Unknown State via a Partially Entangled Quantum Channel

    NASA Astrophysics Data System (ADS)

    Hao, San-Ru; Hou, Bo-Yu; Xi, Xiao-Qiang; Yue, Rui-Hong

    2003-02-01

    In this paper we generalize the standard teleportation to the conclusive teleportation case which can teleport an arbitrary d-dimensional N-particle unknown state via the partially entangled quantum channel. We show that only if the quantum channel satisfies a constraint condition can the most general d-dimensional N-particle unknown state be perfect conclusively teleported. We also present a method for optimal conclusively teleportation of the N-particle states and for constructing the joint POVM which can discern the quantum states on the sender's (Alice's) side. Two typical examples are given so that one can see how our method works. The project supported in part by National Natural Science Foundation of China under Grant No. 19975036 and the Foundation of Science and Technology Committee of Hunan Province of China under Grant No. 21000205

  4. Scaling law on formation and rupture of a dynamical liquid bridge

    NASA Astrophysics Data System (ADS)

    Zhang, Huang; Zhang, Zehao; Liu, Qianfeng; Li, Shuiqing; Department of Thermal Engineering, Tsinghua University Collaboration; Institute of Nuclear Energy; Technology, Tsinghua University Collaboration

    2017-11-01

    The formation and breakup of a pendular liquid bridge in dynamic state is investigated experimentally. The experimental setup arises from a system to measure the coefficient of restitution (COR) of a glass sphere impacting and bouncing on a wetted surface. We compare the effect of surface tension and gravity on the liquid bridge rupture by the capillary length κ-1. For water and liquid 1 (50% water mixed with 50% glycerol), the gravity is dominant on the liquid bridge breakup. And we find that the rupture distance is in good linear trend with the non-dimensional number G by the scaling law analysis. Further, for liquid 2 (25% water mixed with 75% glycerol) that is relatively high viscous, the linear changing of the rupture distance with the capillary number Ca is found. The relation of the rupture distance with G and Ca would be helpful in understanding the complex behavior of the dynamical liquid bridge. This work was funded by the Major State Basic Research Development Program of China (Grant No. 2016YFC0203705) and the China Postdoctoral Science Foundation (Grant No. 2016M601024).

  5. 19. Photocopy of photograph (original in possession of NYC Economic ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    19. Photocopy of photograph (original in possession of NYC Economic Development Corp.) Photographer and date unknown PIER 4 CONNECTING BRIDGE AND WAREHOUSE A - Brooklyn Army Supply Base, Pier 4, Brooklyn, Kings County, NY

  6. 76 FR 59173 - Meetings of Humanities Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-23

    ... NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES Meetings of Humanities Panel AGENCY: The... the Arts and the Humanities Act of 1965, as amended, on the development of humanities programming and content for an upcoming Bridging Cultures Bookshelf project on the subject of Muslim history and cultures...

  7. Investigation and development of an effective, economical and efficient concrete pile splice : [summary].

    DOT National Transportation Integrated Search

    2015-08-01

    Large structures like bridges or tall buildings are often built on deep foundations either precast concrete piles or cast-in-place drilled shafts. The pile or shaft must be long enough to reach : a rock layer or to provide sufficient resistance t...

  8. 76 FR 27671 - Meetings of Humanities Panel

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-12

    ... THE NATIONAL FOUNDATION ON THE ARTS AND THE HUMANITIES Meetings of Humanities Panel AGENCY: The... the Arts and the Humanities Act of 1965, as amended, on the development of humanities programming and content for an upcoming Bridging Cultures Bookshelf project on the subject of Muslim history and cultures...

  9. Improvement of the geotechnical axial design methodology for Colorado's drilled shafts socketed in weak rocks

    DOT National Transportation Integrated Search

    2003-07-01

    Drilled shaft foundations embedded in weak rock formations (e.g., Denver blue claystone and sandstone) support a significant portion of bridges in Colorado. Since the 1960s, empirical methods and rules of thumb have been used to design drilled shafts...

  10. Green History: Reframing Our Past to Save the Planet

    ERIC Educational Resources Information Center

    Jones, Andrea K.

    2016-01-01

    History museums sometimes struggle to communicate history's relevance to visitors. By reframing historic interpretation through the lens of environmental sustainability and by developing issue-based exhibits to bridge past and present, Accokeek Foundation (which runs the National Colonial Farm) has made colonial history more meaningful to…

  11. Protective role of RAD50 on chromatin bridges during abnormal cytokinesis.

    PubMed

    Schröder-Heurich, Bianca; Wieland, Britta; Lavin, Martin F; Schindler, Detlev; Dörk, Thilo

    2014-03-01

    Faithful chromosome segregation is required for preserving genomic integrity. Failure of this process may entail chromatin bridges preventing normal cytokinesis. To test whether RAD50, a protein normally involved in DNA double-strand break repair, is involved in abnormal cytokinesis and formation of chromatin bridges, we used immunocytochemical and protein interaction assays. RAD50 localizes to chromatin bridges during aberrant cytokinesis and subsequent stages of the cell cycle, either decorating the entire bridge or focally accumulating at the midbody zone. Ionizing radiation led to an ∼4-fold increase in the rate of chromatin bridges in an ataxia telangiectatica mutated (ATM)-dependent manner in human RAD50-proficient fibroblasts but not in RAD50-deficient cells. Cells with a RAD50-positive chromatin bridge were able to continue cell cycling and to progress through S phase (44%), whereas RAD50 knockdown caused a deficiency in chromatin bridges as well as an ∼4-fold prolonged duration of mitosis. RAD50 colocalized and directly interacted with Aurora B kinase and phospho-histone H3, and Aurora B kinase inhibition led to a deficiency in RAD50-positive bridges. Based on these observations, we propose that RAD50 is a crucial factor for the stabilization and shielding of chromatin bridges. Our study provides evidence for a hitherto unknown role of RAD50 in abnormal cytokinesis.

  12. Photographic copy of computer enhanced color photographic image. Photographer and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of computer enhanced color photographic image. Photographer and computer draftsman unknown. Original photographic image located in the office of Modjeski and Masters, Consulting Engineers at 1055 St. Charles Avenue, New Orleans, LA 70130. COMPUTER ENHANCED COLOR PHOTOGRAPH SHOWING THE PROPOSED HUEY P. LONG BRIDGE WIDENING LOOKING FROM THE WEST BANK TOWARD THE EAST BANK. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  13. Photographic copy of circa 1933, 10” x 15” black and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa 1933, 10” x 15” black and white aerial photograph. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. AERIAL PHOTOGRAPH SHOWING CONSTRUCTION OF EAST BANK RAILROAD AND BRIDGE APPROACH AT JEFFERSON HIGHWAY INTERSECTION. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  14. 12. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE FROM QUARRY HILL, PRACTICALLY COMPLETED, 6/18/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  15. 17. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, CONSTRUCTION OF WEIR, 1/17/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  16. 13. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE, CONSTRUCTION OF MAIN APRON, 12/9/24 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  17. 11. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1925. Vol. I, Narrative and Photographs, Irrigation District #4, California and Southern Arizona, RG 75, Entry 655, Box 28, National Archives, Washington, DC.) Photographer unknown. SACATON DAM AND BRIDGE SITE FROM QUARRY HILL, 10/1/24 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  18. Hydraulic survey and scour assessment of Bridge 524, Tanana River at Big Delta, Alaska

    USGS Publications Warehouse

    Heinrichs, Thomas A.; Langley, Dustin E.; Burrows, Robert L.; Conaway, Jeffrey S.

    2007-01-01

    Bathymetric and hydraulic data were collected August 26–28, 1996, on the Tanana River at Big Delta, Alaska, at the Richardson Highway bridge and Trans-Alaska Pipeline crossing. Erosion along the right (north) bank of the river between the bridge and the pipeline crossing prompted the data collection. A water-surface profile hydraulic model for the 100- and 500-year recurrence-interval floods was developed using surveyed information. The Delta River enters the Tanana immediately downstream of the highway bridge, causing backwater that extends upstream of the bridge. Four scenarios were considered to simulate the influence of the backwater on flow through the bridge. Contraction and pier scour were computed from model results. Computed values of pier scour were large, but the scour during a flood may actually be less because of mitigating factors. No bank erosion was observed at the time of the survey, a low-flow period. Erosion is likely to occur during intermediate or high flows, but the actual erosion processes are unknown at this time.

  19. Quantum Standard Teleportation Based on the Generic Measurement Bases

    NASA Astrophysics Data System (ADS)

    Hao, San-Ru; Hou, Bo-Yu; Xi, Xiao-Qiang; Yue, Rui-Hong

    2003-10-01

    We study the quantum standard teleportation based on the generic measurement bases. It is shown that the quantum standard teleportation does not depend on the explicit expression of the measurement bases. We have given the correspondence relation between the measurement performed by Alice and the unitary transformation performed by Bob. We also prove that the single particle unknown states and the two-particle unknown cat-like states can be exactly transmitted by means of the generic measurement bases and the correspondence unitary transformations. The project supported in part by National Natural Science Foundation of China, the Hunan Provincial Natural Science Foundation of China, and the Scientific Research Fund of Hunan Provincial Education Department

  20. Wronski's Foundations of Mathematics.

    PubMed

    Wagner, Roi

    2016-09-01

    Argument This paper reconstructs Wronski's philosophical foundations of mathematics. It uses his critique of Lagrange's algebraic analysis as a vignette to introduce the problems that he raised, and argues that these problems have not been properly appreciated by his contemporaries and subsequent commentators. The paper goes on to reconstruct Wronski's mathematical law of creation and his notions of theory and techne, in order to put his objections to Lagrange in their philosophical context. Finally, Wronski's proof of his universal law (the expansion of a given function by any series of functions) is reviewed in terms of the above reconstruction. I argue that Wronski's philosophical approach poses an alternative to the views of his contemporary mainstream mathematicians, which brings up the contingency of their choices, and bridges the foundational concerns of early modernity with those of the twentieth-century foundations crisis. I also argue that Wronski's views may be useful to contemporary philosophy of mathematical practice, if they are read against their metaphysical grain.

  1. The role of foundations: Rockefeller Foundation.

    PubMed

    Rockefeller, David

    The consequences of climate change and the impacts of human activity on the environment have made it clearer than ever before that we must evolve our current model of public health to better account for the inextricable link between human health and the natural systems on which it depends-creating a "public health 2.0" that builds on the innovations of the twentieth century to account for a world where humans have bypassed planetary boundaries to achieve well-being. First coined at the Rockefeller Foundation's Centennial gathering in Beijing in 2013, "Planetary Health" will factor in future health and environmental harms over present-day gains, particularly those that disproportionately affect the poor and those in developing nations. To build this new field, foundations must address the challenge of information, increasing support for research to bridge knowledge gaps on the links between economic development, natural systems, and human health.

  2. AED in the United States of America

    ERIC Educational Resources Information Center

    Academy for Educational Development, 2007

    2007-01-01

    The Academy for Educational Development's (AED's) work in the United States includes programs with many of the nation's major foundations on issues of education reform, parental involvement in the schools, youth development and bridging the distance between school, work, and successful university education. The projects described here cover a wide…

  3. Universal Design: Online Educational Media for Students with Disabilities

    ERIC Educational Resources Information Center

    Sapp, Wendy

    2009-01-01

    The Universal eLearner is an online integrated learning module, under development, that incorporates accessible technology, universal design for learning, and best practices for online education. The American Foundation for the Blind and Bridge Multimedia have just completed a three-year grant through the National Institute on Disability and…

  4. Building Big with David Macaulay. Activity Guide.

    ERIC Educational Resources Information Center

    Sammons, James; Sammons, Fran Lyons; Curtis, Paul

    This activity guide is designed for educators and features suggestions for possible activity paths for different amounts of available time and survival tips for activity leaders. Each activity is divided into two sections--educator ideas and activity handouts. Activity sections include: (1) Foundations; (2) Bridges; (3) Domes; (4) Skyscrapers; (5)…

  5. A numerical investigation into the performance of the soil nail wall and pile foundation at the Swift Delta I-5 Interchange.

    DOT National Transportation Integrated Search

    1993-12-01

    Finite Difference Methods (FDM) and Finite Element Methods (FEM) studies are reported studying the soil nail wall construction at the Swift Delta I-5 Interchange bridge reconstruction in North Portland, Oregon. Five layers of soil nails were installe...

  6. Bridging the Gap between Classrooms and Research Laboratories

    ERIC Educational Resources Information Center

    Dempsey, Brian; Hibbett, David; Binder, Manfred

    2007-01-01

    In the ever-expanding realm of science, educators struggle to share new discoveries and techniques with their students. Keeping abreast of recent advances can be daunting, even for the most motivated teacher. Fortunately, the National Science Foundation's (NSF) Research Experiences for Teachers (RET) program helps educators keep up with the…

  7. Development of LRFD procedures for bridge pile foundations in Iowa - volume I : an electronic database for PIle LOad Tests (PILOT).

    DOT National Transportation Integrated Search

    2011-01-01

    For well over 100 years, the Working Stress Design (WSD) approach has been the traditional basis for geotechnical design with regard to settlements or failure conditions. However, considerable effort has been put forth over the past couple of decades...

  8. Modules for Introducing Organometallic Reactions: A Bridge between Organic and Inorganic Chemistry

    ERIC Educational Resources Information Center

    Schaller, Chris P.; Graham, Kate J.; Johnson, Brian J.

    2015-01-01

    Transition metal organometallic reactions have become increasingly important in the synthesis of organic molecules. A new approach has been developed to introduce organometallic chemistry, along with organic and inorganic chemistry, at the foundational level. This change highlights applications of organometallic chemistry that have dramatically…

  9. Educating to Build Bridges

    ERIC Educational Resources Information Center

    Goldin, Andrea Paula; Calero, Cecilia Ines; Pena, Marcela; Ribeiro, Sidarta; Sigman, Mariano

    2013-01-01

    In March 2012, 30 faculty and 49 students from all over the world met in El Calafate, Argentina, during two intense weeks. It was the second Latin American School for Education, Cognitive, and Neural Sciences (LASchool), sponsored by the James S. McDonnell Foundation. The LA School seeks to critically examine research findings potentially relevant…

  10. Exploring Stakeholder Values and Interests in Evaluation

    ERIC Educational Resources Information Center

    Orr, Shannon K.

    2010-01-01

    One of the challenges facing program evaluation education is how to bridge the need to train students in theoretical and methodological foundations, and also prepare them for the unpredictability and complex environment outside the classroom. This issue is particularly challenging in terms of understanding stakeholder values and interests. The…

  11. Illinois Adult Education Bridges: Promising Practices. Transition Highlights. Issue 4

    ERIC Educational Resources Information Center

    Bragg, Debra; Oertle, Kathleen Marie; Kim, Sujung; Kirby, Catherine; Taylor, Jason; Harmon, Tim; Liss, Loralea

    2011-01-01

    To enhance state-level adult education and employment policy, in 2007 the Joyce Foundation began the Shifting Gears (SG) initiative to assist six states (Illinois, Indiana, Michigan, Minnesota, Ohio and Wisconsin) to integrate adult education, workforce development and postsecondary education policies and improve job opportunities for low-skilled…

  12. Centrifuge modeling of cyclic lateral response of pile-cap systems and seat-type abutments in dry sands

    DOT National Transportation Integrated Search

    1998-10-02

    This report presents the results of slow, cyclic, lateral-loading centrifuge tests performed on models of pile-cap foundation systems and seat-type bridge abutements in dry Neveda sand of 75% relative density to study the lateral response of these sy...

  13. Industrialized timber structures.

    DOT National Transportation Integrated Search

    1974-01-01

    It was recently learned that a number of innovations in structural timber components are available to the construction industry, but that they were largely unknown to bridge designers. The purpose of this study was to develop for the Department a fea...

  14. Teleportation of Unknown Superpositions of Collective Atomic Coherent States

    NASA Astrophysics Data System (ADS)

    Zheng, Shi-Biao

    2001-06-01

    We propose a scheme to teleport an unknown superposition of two atomic coherent states with different phases. Our scheme is based on resonant and dispersive atom-field interaction. Our scheme provides a possibility of teleporting macroscopic superposition states of many atoms first time. The project supported by National Natural Science Foundation of China under Grant No. 60008003

  15. The Drosophila Extradenticle and Homothorax selector proteins control branchless/FGF expression in mesodermal bridge-cells.

    PubMed

    Merabet, Samir; Ebner, Andreas; Affolter, Markus

    2005-08-01

    The stereotyped outgrowth of tubular branches of the Drosophila tracheal system is orchestrated by the local and highly dynamic expression profile of branchless (bnl), which encodes a secreted fibroblast growth factor (FGF)-like molecule. Despite the importance of the spatial and temporal bnl regulation, little is known about the upstream mechanisms that establish its complex expression pattern. Here, we show that the Extradenticle and Homothorax selector proteins control bnl transcription in a single cell per segment, the mesodermal bridge-cell. In addition, we observed that a key determinant of bridge-cell specification, the transcription factor Hunchback, is also required for bnl expression. Therefore, we propose that one of the functions of the bridge-cell is to synthesize and secrete the chemoattractant Bnl. These findings provide a hitherto unknown and interesting link between combinatorial inputs of transcription factors, cell-specific ligand expression and organ morphogenesis.

  16. Dynamic characterization and damage detection in the I-40 bridge over the Rio Grande

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Farrar, C.R.; Baker, W.E.; Bell, T.M.

    In the 1960`s and 1970`s over 2500 bridges were built in the U.S. with a design similar to those on Interstate 40 over the Rio Grande in Albuquerque, New Mexico. These bridges were built without structural redundancy and typically have only two plate girders carrying the entire dead and live loads. Failure of either girder is assumed to produce catastrophic failure of the bridge, hence these bridges are referred to as fracture-critical bridges. The Federal Highway Administration (FHWA) and the National Science Foundation (NSF) have provided funds to New Mexico State University (NMSU) through the New Mexico State Highway andmore » Transportation Department (NMSH&TD) and The Alliance For Transportation Research (ATR) for evaluation and testing of the existing fracture critical bridges over the Rio Grande. Because the 1-40 bridges over the Rio Grande were to be razed during the summer of 1993, the investigators were able to introduce simulated fatigue cracks, similar to those observed in the field, into the structure in order to test various damage identification methods and to observe the changes in load paths through the structure caused by the cracking. To support this research effort, NMSU contracted Los Alamos National Laboratory (LANL) to perform experimental modal analyses, and to develop experimentally verified numerical models of the bridge. Scientists from the LANL`s Condensed Matter and Thermal Physics Group (P-10) applied state-of-the-art sensors and data acquisition software to the modal tests. Engineers from the LANL`s Advanced Engineering Technology Group (MEE-13) conducted ambient and forced vibration tests to verify detailed and simplified finite element models of the bridge. Forced vibration testing was done in conjunction with engineers from Sandia National Laboratory (SNL) who provided and operated a hydraulic shaker.« less

  17. Streambed stresses and flow around bridge piers

    USGS Publications Warehouse

    Parola, A.C.; Ruhl, K.J.; Hagerty, D.J.; Brown, B.M.; Ford, D.L.; Korves, A.A.

    1996-01-01

    Scour of streambed material around bridge foundations by floodwaters is the leading cause of catastrophic bridge failure in the United States. The potential for scour and the stability of riprap used to protect the streambed from scour during extreme flood events must be known to evaluate the likelihood of bridge failure. A parameter used in estimating the potential for scour and removal of riprap protection is the time-averaged shear stress on the streambed often referred to as boundary stress. Bridge components, such as bridge piers and abutments, obstruct flow and induce strong vortex systems that create streambed or boundary stresses significantly higher than those in unobstructed flow. These locally high stresses can erode the streambed around pier and abutment foundations to the extent that the foundation is undermined, resulting in settlement or collapse of bridge spans. The purpose of this study was to estimate streambed stresses at a bridge pier under full-scale flow conditions and to compare these stresses with those obtained previously in small-scale model studies. Two-dimensional velocity data were collected for three flow conditions around a bridge pier at the Kentucky State Highway 417 bridge over the Green River at Greensburg in Green County, Ky. Velocity vector plots and the horizontal component of streambed stress contour plots were developed from the velocity data. The streambed stress contours were developed using both a near-bed velocity and velocity gradient method. Maximum near-bed velocities measured at the pier for the three flow conditions were 1.5, 1.6, and 2.0 times the average near-bed velocities measured in the upstream approach flow. Maximum streambed stresses for the three flow conditions were determined to be 10, 15, and 36 times the streambed stresses of the upstream approach flow. Both the near-bed velocity measurements and approximate maximum streambed stresses at the full-scale pier were consistent with those observed in experiments using small-scale models in which similar data were collected, except for a single observation of the near-bed velocity data and the corresponding streambed stress determination. The location of the maximum streambed stress was immediately downstream of a 90 degree radial of the upstream cylinder (with the center of the upstream cylinder being the origin) for the three flow conditions. This location was close to the flow wake separation point at the upstream cylinder. Other researchers have observed the maximum streambed stress around circular cylinders at this location or at a location immediately upstream of the wake separation point. Although the magnitudes of the estimated streambed stresses measured at the full-scale pier were consistent with those measured in small-scale model studies, the stress distributions were significantly different than those measured in small-scale models. The most significant discrepancies between stress contours developed in this study and those developed in the small-scale studies for flow around cylindrical piers on a flat streambed were associated with the shape of the stress contours. The extent of the high stress region of the streambed around the full-scale pier was substantially larger than the diameter of the upstream cylinder, while small-scale models had small regions compared to the diameter of the model cylinders. In addition, considerable asymmetry in the stress contours was observed. The large region of high stress and asymmetry was attributed to several factors including (1) the geometry of the full-scale pier, (2) the non-planar topography of the streambed, (3) the 20 degree skew of the pier to the approaching flow, and (4) the non-uniformity of the approach flow. The extent of effect of the pier on streambed stresses was found to be larger for the full-scale site than for model studies. The results from the model studies indicated that the streambed stresses created by the obstruction of flow by the 3-foot wide pi

  18. Open Educational Resources: A Bridge to Education in the Developing World

    ERIC Educational Resources Information Center

    Pereira, Mike

    2007-01-01

    Leveraging ICT to equalize access to education is critical in a world with over four billion poor people who have little access to formal education. Mainstreaming OER as a public good throughout the developing world could make an enormous contribution. The Development Gateway Foundation has established an online OER…

  19. Undergraduate Course and Curriculum Development Program and Calculus and the Bridge to Calculus Program: 1993 Awards.

    ERIC Educational Resources Information Center

    National Science Foundation, Arlington, VA. Div. of Undergraduate Education.

    The Undergraduate Course and Curriculum Development Program of the National Science Foundation supports the development of courses in all disciplines to improve the quality of undergraduate courses and curricula in science, mathematics, engineering, and technology. The purpose of the program in Curriculum Development in Mathematics: Calculus and…

  20. The First R: Every Child's Right to Read. (Language and Literacy Series).

    ERIC Educational Resources Information Center

    Graves, Michael F., Ed.; And Others

    This book suggests that learning to read should be a right for all children. From this viewpoint, the book constructs a bridge between current knowledge of reading processes and educational practice by incorporating a comprehensive range of theory, practice, and research, and a solid foundation in education and psychological science. Topics…

  1. 41. Reconstruction of roadway; view of swing span looking northwest ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. Reconstruction of roadway; view of swing span looking northwest from Bronx approach, showing new apron under construction-concrete foundation partly built. Note trolley in background and broken asphalt in roadway bed. December 15, 1925 photograph. - University Heights Bridge, Spanning Harlem River at 207th Street & West Harlem Road, New York County, NY

  2. Bridge Programs in Illinois: Summaries, Outcomes, and Cross-Site Findings

    ERIC Educational Resources Information Center

    Bragg, D.; Harmon, T.; Kirby, C.; Kim, S.

    2010-01-01

    An increasing number of jobs in today's workforce require postsecondary education, yet large numbers of workers lack the essential skills and credentials to fill these jobs. The result is that many workers remain underemployed, reaching a ceiling early in their working careers. In 2007, the Joyce Foundation launched the Shifting Gears initiative…

  3. Promoting Online Learner Self-Efficacy through Instructional Strategies and Course Supports

    ERIC Educational Resources Information Center

    Backs, Annette

    2017-01-01

    The purpose of this basic qualitative study was to examine online learner self-efficacy in terms of instructional strategies and course supports. Prior studies have focused primarily on factors within learners (e.g., motivation, satisfaction, achievement). The current study, with a foundation in adult learning theory, bridged the gap between…

  4. Finite element analysis of the lateral load test on battered pile group at I-10 twin span bridge : research project capsule.

    DOT National Transportation Integrated Search

    2016-04-01

    The objectives of this research study are to develop a three-dimensional FE : model for simulating the behavior of a battered pile group foundation subjected : to lateral loading, and to verify the model using results from a unique static : lateral l...

  5. Urban Youth with Disabilities: Factors Affecting Transition Employment

    ERIC Educational Resources Information Center

    Fabian, Ellen S.

    2007-01-01

    Although postsecondary employment outcomes for transition-age youth with disabilities have improved over the past decade, minority youth with disabilities continue to lag behind their peers in achieving a job. This study of predominantly minority youth participating in the Marriott Foundation's Bridges From School to Work Program from 2000 to 2005…

  6. Social Indicators in Surveys of Urban Aboriginal Residents in Saskatoon

    ERIC Educational Resources Information Center

    Anderson, Alan B.; Spence, Cara

    2008-01-01

    The Bridges and Foundations Project on Urban Aboriginal Housing, a Community-University Research Alliance (CURA) project financed primarily by the Social Sciences and Humanities Research Council of Canada (SSHRC) and the Canada Mortgage and Housing Corporation (CMHC), has been operational in Saskatoon since early 2001. During these past 5 years…

  7. Bridging the Gap: Helping Students from Competitive Dance Training Backgrounds Become Successful Dance Majors

    ERIC Educational Resources Information Center

    Schupp, Karen

    2010-01-01

    This article examines the methods the author uses to help first-year dance majors from competitive training backgrounds expand their understanding of dance and learn to create a strong foundation for collegiate success. By acknowledging differences in dance backgrounds, carefully emphasizing the theory behind postmodern contemporary dance…

  8. Second Differences: A Mathematical Bridge between Two Projects

    ERIC Educational Resources Information Center

    Fischer, Joyce; Wayment, Stanley; Johnson, Christopher

    2010-01-01

    Making connections is one of the most important foundations involved in learning mathematics. Two projects are presented in this article: one involving Newton's Second Law of Motion and the other involving the determination of star numbers, a type of figurate number. The two invoke seemingly different modalities for students at different levels of…

  9. Bridging Literacy Acquisition and Self-Regulated Learning: Using a SRL Framework to Support Struggling Readers

    ERIC Educational Resources Information Center

    Holtzheuser, Sierra; McNamara, John

    2014-01-01

    Reading is conceptualized as a hierarchy of component skills where lower order emergent literacy skills set the foundation for higher order reading skills such as fluency and comprehension. Approximately 20% of readers struggle within this hierarchical process (Fielding, Kerr, & Rosier, 2007). Struggling readers are susceptible to the Matthew…

  10. Bridging the Educational Research-Teaching Practice Gap: Foundations for Assessing and Developing Biochemistry Students' Visual Literacy

    ERIC Educational Resources Information Center

    Schonborn, Konrad J.; Anderson, Trevor R.

    2010-01-01

    External representations (ERs), such as diagrams, animations, and dynamic models are vital tools for communicating and constructing knowledge in biochemistry. To build a meaningful understanding of structure, function, and process, it is essential that students become visually literate by mastering key cognitive skills that are essential for…

  11. Infographics And Public Policy: Using Data Visualization To Convey Complex Information.

    PubMed

    Otten, Jennifer J; Cheng, Karen; Drewnowski, Adam

    2015-11-01

    Data visualization combines principles from psychology, usability, graphic design, and statistics to highlight important data in accessible and appealing formats. Doing so helps bridge knowledge producers with knowledge users, who are often inundated with information and increasingly pressed for time. Project HOPE—The People-to-People Health Foundation, Inc.

  12. Photographic copy of circa 1934 black and white aerial photograph. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa 1934 black and white aerial photograph. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. CIRCA 1934 AERIAL PHOTOGRAPH TAKEN FROM EAST BANK LOOKING SOUTH TOWARD WEST BANK SHOWING COMPLETED BRIDGE PIERS AND DECK TRUSS BETWEEN PIERS C, B, AND V. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  13. Photographic copy of black and white, 4” x 8” photograph. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of black and white, 4” x 8” photograph. Located loose in oversized box at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. EARLY PHOTOGRAPH OF BRIDGE TAKEN AT NIGHT FROM WEST BANK APPROACH LOOKING NORTH TOWARD EAST BANK SHOWING ILLUMINATED LIGHT FIXTURES AT EDGE OF ROADWAY. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  14. Photographic copy of 10” x 14”, black and white photograph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of 10” x 14”, black and white photograph mounted on card stock. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. PHOTOGRAPH OF WEST BOUND DESCENDING ROADWAY LOOKING SOUTHEAST TOWARD THE WEST BANK. BRIDGE ROADWAY NEAR COMPLETION, LIGHT POLES IN PLACE, NO FIXTURES. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  15. Photographic copy of circa, 1934 black and white photograph. Loose ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa, 1934 black and white photograph. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. VIEW FROM EAST BANK LOOKING SOUTH TOWARD WEST BANK AT BRIDGE UNDER CONSTRUCTION SHOWING COMPLETED THROUGH TRUSS SPAN BETWEEN PIER III AND IV AND THE UNCOMPLETED DECK TRUSS SPAN BETWEEN PIER IV AND V. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  16. Meaning-based group counseling for bereavement: bridging theory with emerging trends in intervention research.

    PubMed

    MacKinnon, Christopher J; Smith, Nathan Grant; Henry, Melissa; Berish, Mel; Milman, Evgenia; Körner, Annett; Copeland, Laura S; Chochinov, Harvey M; Cohen, S Robin

    2014-01-01

    A growing body of scholarship has evaluated the usefulness of meaning-based theories in the context of bereavement counseling. Although scholars have discussed the application of meaning-based theories for individual practice, there is a lack of inquiry regarding its implications when conducting bereavement support groups. The objective of this article is to bridge meaning-based theories with bereavement group practice, leading to a novel intervention and laying the foundation for future efficacy studies. Building on recommendations specified in the literature, this article outlines the theoretical paradigms and structure of a short-term meaning-based group counseling intervention for uncomplicated bereavement.

  17. Electromagnetic sensors for monitoring of scour and deposition processes at bridges and offshore wind turbines

    NASA Astrophysics Data System (ADS)

    Michalis, Panagiotis; Tarantino, Alessandro; Judd, Martin

    2014-05-01

    Recent increases in precipitation have resulted in severe and frequent flooding incidents. This has put hydraulic structures at high risk of failure due to scour, with severe consequences to public safety and significant economic losses. Foundation scour is the leading cause of bridge failures and one of the main climate change impacts to highway and railway infrastructure. Scour action is also being considered as a major risk for offshore wind farm developments as it leads to excessive excavation of the surrounding seabed. Bed level conditions at underwater foundations are very difficult to evaluate, considering that scour holes are often re-filled by deposited loose material which is easily eroded during smaller scale events. An ability to gather information concerning the evolution of scouring will enable the validation of models derived from laboratory-based studies and the assessment of different engineering designs. Several efforts have focused on the development of instrumentation techniques to measure scour processes at foundations. However, they are not being used routinely due to numerous technical and cost issues; therefore, scour continues to be inspected visually. This research project presents a new sensing technique, designed to measure scour depth variation and sediment deposition around the foundations of bridges and offshore wind turbines, and to provide an early warning of an impending structural failure. The monitoring system consists of a probe with integrated electromagnetic sensors, designed to detect the change in the surrounding medium around the foundation structure. The probe is linked to a wireless network to enable remote data acquisition. A developed prototype and a commercial sensor were evaluated to quantify their capabilities to detect scour and sediment deposition processes. Finite element modelling was performed to define the optimum geometric characteristics of the prototype scour sensor based on models with various permittivity conditions. The experimental analysis was conducted using simulations and open channel flume tests in different sediment and temperature conditions. The density and salinity effects on the response of the sensors were also evaluated and reported herein. The obtained results indicate that the sensors are capable of exhibiting high sensitivity to scour and sediment deposition processes under the different tested environmental conditions. Saline water and temperature induced electrical conductivity changes were also found to have inevitable influences on the sensor signals. Based on this research, it is concluded that the proposed monitoring system has considerable potential for field applications that will contribute to improving the resilience and sustainability of hydraulic and marine structures.

  18. Ghost-tree: creating hybrid-gene phylogenetic trees for diversity analyses.

    PubMed

    Fouquier, Jennifer; Rideout, Jai Ram; Bolyen, Evan; Chase, John; Shiffer, Arron; McDonald, Daniel; Knight, Rob; Caporaso, J Gregory; Kelley, Scott T

    2016-02-24

    Fungi play critical roles in many ecosystems, cause serious diseases in plants and animals, and pose significant threats to human health and structural integrity problems in built environments. While most fungal diversity remains unknown, the development of PCR primers for the internal transcribed spacer (ITS) combined with next-generation sequencing has substantially improved our ability to profile fungal microbial diversity. Although the high sequence variability in the ITS region facilitates more accurate species identification, it also makes multiple sequence alignment and phylogenetic analysis unreliable across evolutionarily distant fungi because the sequences are hard to align accurately. To address this issue, we created ghost-tree, a bioinformatics tool that integrates sequence data from two genetic markers into a single phylogenetic tree that can be used for diversity analyses. Our approach starts with a "foundation" phylogeny based on one genetic marker whose sequences can be aligned across organisms spanning divergent taxonomic groups (e.g., fungal families). Then, "extension" phylogenies are built for more closely related organisms (e.g., fungal species or strains) using a second more rapidly evolving genetic marker. These smaller phylogenies are then grafted onto the foundation tree by mapping taxonomic names such that each corresponding foundation-tree tip would branch into its new "extension tree" child. We applied ghost-tree to graft fungal extension phylogenies derived from ITS sequences onto a foundation phylogeny derived from fungal 18S sequences. Our analysis of simulated and real fungal ITS data sets found that phylogenetic distances between fungal communities computed using ghost-tree phylogenies explained significantly more variance than non-phylogenetic distances. The phylogenetic metrics also improved our ability to distinguish small differences (effect sizes) between microbial communities, though results were similar to non-phylogenetic methods for larger effect sizes. The Silva/UNITE-based ghost tree presented here can be easily integrated into existing fungal analysis pipelines to enhance the resolution of fungal community differences and improve understanding of these communities in built environments. The ghost-tree software package can also be used to develop phylogenetic trees for other marker gene sets that afford different taxonomic resolution, or for bridging genome trees with amplicon trees. ghost-tree is pip-installable. All source code, documentation, and test code are available under the BSD license at https://github.com/JTFouquier/ghost-tree .

  19. Bridge Scour Measurements Using the Rfid Technology

    NASA Astrophysics Data System (ADS)

    Moustakidis, I.; Tsakiris, A. G.; Papanicolaou, T.

    2010-12-01

    The main purpose of this project is to develop a system for continuous monitoring scour around bridge piers and abutments (i.e. bridge scour) using the Radio Frequency IDentification (RFID) technology and examine its applicability for estimating scour around a pier or an existing bridge. Excessive bridge scour can compromise the bridge foundations and lead to dramatic bridge collapses with significant impacts on economy and traveling public safety. An RFID system consists of three main components: the low frequency reader (~134.2 kHz frequency), the transponder (derived from transmitter/responder) and the antenna (of rectangular shape with one or more loops). RFID is a technology that permits the wireless two-way transfer of information from a reader to a transponder via RF waves transmitted with an antenna. What makes RFIDs suitable for monitoring bridge scour is that no line of sight is necessary between the reader and the transponder, which can be detected even when it is buried in the bed substrate. The proposed system for monitoring bridge scour relies on the principle that transponders oriented perpendicular to antenna plane can be detected at longer distances, than transponders oriented parallel to it. We intend to attach transponders at predetermined locations (depths) along a chain with known length. The chain will subsequently be driven into the bed substrate at the location where bridge scour hole is expected within the detection range of the antenna, which will be installed directly above the chain. The chain will retain the transponders perpendicular to the antenna plane, so that they can be continuously detected. Once scour takes place, the transponders will be oriented parallel to the antenna plane and thus they will not be detected. The latter will indicate that bridge scour reached the known depth, at which the transponder was initially buried. Once a prototype RFID system is functional, future research will aim at combining it with satellite technology for real time acquisition of bridge scour information to a base station.

  20. 48. Photocopy of photograph (original print in possession of Historic ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    48. Photocopy of photograph (original print in possession of Historic Bethlehem, Inc., Bethlehem, PA) photographer unknown, 1922. Concrete handling method along the main street ramp - Hill to Hill Bridge, Spans Lehigh River at State Route 378, Bethlehem, Northampton County, PA

  1. Comparative study of deterioration forms on nearby granitic bridges from an urban setting in the NW Iberian Peninsula

    NASA Astrophysics Data System (ADS)

    Pozo-Antonio, J. S.; Pereira, M. F. C.; Rocha, C. S. A.; Puente, I.; Figueiredo, C.

    2016-12-01

    Stone coatings, biological colonization, efflorescence and detachments are frequent on granitic surfaces of our cultural heritage infrastructure. In order to find the different origins for each deterioration form, this paper studies and compares several coatings, efflorescence and flakes found on granitic surfaces of bridges from different ages built in the same area (Ourense in NW Iberian Peninsula at 90 km from the sea) under the same environmental and traffic conditions. The most recent bridge was the New Bridge built in the beginning of 20th century and the oldest one was the Roman Bridge with the 1st century AD foundations but its current structure was built in 17th century. The New Bridge has exhibited a greater variety of deterioration forms such as black crusts, carbonate crusts, efflorescence and biological colonization. On the Roman Bridge, black crusts, efflorescence to a greater extent, and flakes associated with salt crystallization processes have been identified. Scanning electron microscopy with energy dispersive X-ray spectroscopy, X-ray diffraction and Fourier transform infrared (FTIR) spectroscopy studies were carried out in order to establish their composition, and optical and electronic microscopies and X-ray microtomography were used to study their morphologies. As a result, anthropogenic factors (industrial activities, traffic pollution and fertilizers) are considered to be the main contributors to crusts, efflorescence and flake formation on both studied substrates (granite ashlars and mortars). To a lesser extent, natural factors (marine influence and bird droppings) should be taken into account.

  2. Identification of unusual events in multi-channel bridge monitoring data

    NASA Astrophysics Data System (ADS)

    Omenzetter, Piotr; Brownjohn, James Mark William; Moyo, Pilate

    2004-03-01

    Continuously operating instrumented structural health monitoring (SHM) systems are becoming a practical alternative to replace visual inspection for assessment of condition and soundness of civil infrastructure such as bridges. However, converting large amounts of data from an SHM system into usable information is a great challenge to which special signal processing techniques must be applied. This study is devoted to identification of abrupt, anomalous and potentially onerous events in the time histories of static, hourly sampled strains recorded by a multi-sensor SHM system installed in a major bridge structure and operating continuously for a long time. Such events may result, among other causes, from sudden settlement of foundation, ground movement, excessive traffic load or failure of post-tensioning cables. A method of outlier detection in multivariate data has been applied to the problem of finding and localising sudden events in the strain data. For sharp discrimination of abrupt strain changes from slowly varying ones wavelet transform has been used. The proposed method has been successfully tested using known events recorded during construction of the bridge, and later effectively used for detection of anomalous post-construction events.

  3. Do Facilitated Online Dual Credit Classes Result in Deep Learning?

    ERIC Educational Resources Information Center

    Stark Education Partnership, 2015

    2015-01-01

    This study, with funding from the Jennings Foundation, sought to answer the following broad research question: Do facilitated online dual credit courses result in deep learning? The answer to this question is key to addressing barriers many students face in bridging from high school to college. This report includes a descriptive case study that…

  4. "Wilderness Therapy: Foundations, Theory and Research," by Jennifer Davis-Berman & Dene S. Berman [Book Review].

    ERIC Educational Resources Information Center

    Swiderski, Michael J.; Mitten, Denise

    1994-01-01

    Two reviewers present divergent points of view concerning a book that provides a comprehensive overview of the field of wilderness therapy. The first reviewer sees the book as valuable in bridging the gap between the mental health profession and outdoor experiential education, whereas the second reviewer suggests that the book gives ambiguous…

  5. Exploring Experimental Design: An Excel-Based Simulation Using Steller Sea Lion Behavior

    ERIC Educational Resources Information Center

    Ryan, Wendy L.; St. Iago-McRae, Ezry

    2016-01-01

    Experimentation is the foundation of science and an important process for students to understand and experience. However, it can be difficult to teach some aspects of experimentation within the time and resource constraints of an academic semester. Interactive models can be a useful tool in bridging this gap. This freely accessible simulation…

  6. The Rational Number Sub-Constructs as a Foundation for Problem Solving

    ERIC Educational Resources Information Center

    Doyle, Kathleen M.; Dias, Olen; Kennis, James R.; Czarnocha, Bronislaw; Baker, William

    2016-01-01

    One of the many roles of two year community colleges in the United States is to bridge the gap between secondary school and college for students who graduate from high school with weak mathematics skills that prevent them from enrolling in college level mathematics courses. At community colleges remedial or developmental mathematics courses review…

  7. Bridging College and Careers: Using Dual Enrollment to Enhance Career and Technical Education Pathways. An NCPR Working Paper

    ERIC Educational Resources Information Center

    Rodriguez, Olga; Hughes, Katherine L.; Belfield, Clive

    2012-01-01

    The Concurrent Courses Initiative (CCI), funded by The James Irvine Foundation from 2008 until 2011, comprised eight secondary/postsecondary partnerships across California that offered dual enrollment programs with supplemental student supports. The goal of the CCI was to expand access to supportive, career-focused dual enrollment for students…

  8. Water, frost, and frost resistance of natural and artificial building stones

    USGS Publications Warehouse

    Breyer, H.; Britt, S. H.

    1953-01-01

    The worst enemy of construction engineering and of construction material is uncontrollable water, whether it be ground-, seepage-, rainwater, water of condensation, or melting snow and ice, exerting objectionable pressure upon tracks and roads. this applies as well to structures above the ground as to bridge piers and foundations, road construction, earthwork, etc. 

  9. 3. Historic American Buildings Survey Photocopy of old view, date ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    3. Historic American Buildings Survey Photocopy of old view, date unknown From collection of the Kansas City Museum of History and Science, Kansas City, Mo. INFORMAL DRIVE LOOKING NORTHWEST JUST BELOW MOUSE CREEK BRIDGE - Longview Farm, Longview Road, Lees Summit, Jackson County, MO

  10. Adjustable bridge blocks make huge difference to the self-assembly of multiblock copolymers

    NASA Astrophysics Data System (ADS)

    Li, Weihua

    We present theoretical studies on two types of multiblock copolymers, whose self-assemblies lead to a lot of novel ordered nanostructures. The first example is BABCB multiblock terpolymer, where A- and C-blocks separately aggregate into isolated domains and the three B-blocks with adjustable lengths form the matrix. As a result, the middle B-block forms a natural bridge connecting A- and C-domains. In contrast to ABC, the BABCB can form many binary spherical and cylindrical phases with tunable coordination numbers. In addition, the ABCB solution can form a lot of planet-satellite micellar superstructures with tunable number of satellites that varies from 3 to 20. The another system is AB-type multiblock copolymers. In contrast to the above system, there is no natural bridge. Accordingly, we introduce multiple arms into the architecture which tend to partition themselves into different domains to maximize their configurational entropy, thus forming effective bridges. Furthermore, each arm is devised as BAB triblock to enable adjustable length of bridges. With this copolymer, we predict a few non-classical ordered phases, including a square array cylinder. Our study opens the possibilities of fabricating desired nanostructures using designed block copolymers. National Natural Science Foundation of China (No. 21322407, 21574026).

  11. Inspection Mechanism and Experimental Study of Prestressed Reverse Tension Method under PC Beam Bridge Anchorage

    NASA Astrophysics Data System (ADS)

    Peng, Zhang

    2018-03-01

    the prestress under anchorage is directly related to the structural security and performance of PC beam bridge. The reverse tension method is a kind of inspection which confirms the prestress by exerting reversed tension load on the exposed prestressing tendon of beam bridge anchoring system. The thesis elaborately expounds the inspection mechanism and mechanical effect of reverse tension method, theoretically analyzes the influential elements of inspection like tool anchorage deformation, compression of conjuncture, device glide, friction of anchorage loop mouth and elastic compression of concrete, and then presents the following formula to calculate prestress under anchorage. On the basis of model experiment, the thesis systematically studies some key issues during the reverse tension process of PC beam bridge anchorage system like the formation of stress-elongation curve, influential factors, judgment method of prestress under anchorage, variation trend and compensation scale, verifies the accuracy of mechanism analysis and demonstrates: the prestress under anchorage is less than or equal to 75% of the ultimate strength of prestressing tendon, the error of inspect result is less than 1%, which can meet with the demands of construction. The research result has provided theoretical basis and technical foundation for the promotion and application of reverse tension in bridge construction.

  12. The Functional Role of eL19 and eB12 Intersubunit Bridge in the Eukaryotic Ribosome.

    PubMed

    Kisly, Ivan; Gulay, Suna P; Mäeorg, Uno; Dinman, Jonathan D; Remme, Jaanus; Tamm, Tiina

    2016-05-22

    During translation, the two eukaryotic ribosomal subunits remain associated through 17 intersubunit bridges, five of which are eukaryote specific. These are mainly localized to the peripheral regions and are believed to stabilize the structure of the ribosome. The functional importance of these bridges remains largely unknown. Here, the essentiality of the eukaryote-specific bridge eB12 has been investigated. The main component of this bridge is ribosomal protein eL19 that is composed of an N-terminal globular domain, a middle region, and a long C-terminal α-helix. The analysis of deletion mutants demonstrated that the globular domain and middle region of eL19 are essential for cell viability, most likely functioning in ribosome assembly. The eB12 bridge, formed by contacts between the C-terminal α-helix of eL19 and 18S rRNA in concert with additional stabilizing interactions involving either eS7 or uS17, is dispensable for viability. Nevertheless, eL19 mutants impaired in eB12 bridge formation displayed slow growth phenotypes, altered sensitivity/resistance to translational inhibitors, and enhanced hyperosmotic stress tolerance. Biochemical analyses determined that the eB12 bridge contributes to the stability of ribosome subunit interactions in vitro. 60S subunits containing eL19 variants defective in eB12 bridge formation failed to form 80S ribosomes regardless of Mg(2+) concentration. The reassociation of 40S and mutant 60S subunits was markedly improved in the presence of deacetylated tRNA, emphasizing the importance of tRNAs during the subunit association. We propose that the eB12 bridge plays an important role in subunit joining and in optimizing ribosome functionality. Copyright © 2016 Elsevier Ltd. All rights reserved.

  13. Bridging Class and Field: Field Instructors' and Liaisons' Reactions to Information about Students' Baseline Performance Derived from Simulated Interviews

    ERIC Educational Resources Information Center

    Bogo, Marion; Lee, Barbara; McKee, Eileen; Ramjattan, Roxanne; Baird, Stephanie L.

    2017-01-01

    To strengthen students' preparation for engaging in field learning, an innovation was implemented to teach and assess foundation-year students' performance prior to entering field education. An Objective Structured Clinical Examination informed the final evaluation of students' performance in two companion courses on practice theory and skills.…

  14. A Conceptual Framework for Educational Design at Modular Level to Promote Transfer of Learning

    ERIC Educational Resources Information Center

    Botma, Yvonne; Van Rensburg, G. H.; Coetzee, I. M.; Heyns, T.

    2015-01-01

    Students bridge the theory-practice gap when they apply in practice what they have learned in class. A conceptual framework was developed that can serve as foundation to design for learning transfer at modular level. The framework is based on an adopted and adapted systemic model of transfer of learning, existing learning theories, constructive…

  15. Basic Education for Adults: Pathways to College and Careers for Washington's Emerging Workforce. Washington's Community and Technical Colleges

    ERIC Educational Resources Information Center

    Washington State Board for Community and Technical Colleges, 2015

    2015-01-01

    This brief describes the Basic Education for Adults (BEdA) programs that bridge the gap between school and work, thereby creating pathways to college and careers for Washington's emerging workforce. BEdA programs teach foundational skills--reading, writing, math, technology and English language--so adults can move through college and into…

  16. Russia Between West and East

    DTIC Science & Technology

    2003-10-01

    the West in general and Russia . The contradictions stemming from Russia’s rapprochement with the West are reflected in the balance of forces in ...circulate this thoughtful and comprehensive analysis of Russia and the West by Dr. Mikhail Nosov of the Foundation "East-West Bridges" in Moscow. Eminent... in the West. After all, Russia never had a nation- state of

  17. Bridge Structure Deformation Prediction Based on GNSS Data Using Kalman-ARIMA-GARCH Model

    PubMed Central

    Li, Xiaoqing; Wang, Yu

    2018-01-01

    Bridges are an essential part of the ground transportation system. Health monitoring is fundamentally important for the safety and service life of bridges. A large amount of structural information is obtained from various sensors using sensing technology, and the data processing has become a challenging issue. To improve the prediction accuracy of bridge structure deformation based on data mining and to accurately evaluate the time-varying characteristics of bridge structure performance evolution, this paper proposes a new method for bridge structure deformation prediction, which integrates the Kalman filter, autoregressive integrated moving average model (ARIMA), and generalized autoregressive conditional heteroskedasticity (GARCH). Firstly, the raw deformation data is directly pre-processed using the Kalman filter to reduce the noise. After that, the linear recursive ARIMA model is established to analyze and predict the structure deformation. Finally, the nonlinear recursive GARCH model is introduced to further improve the accuracy of the prediction. Simulation results based on measured sensor data from the Global Navigation Satellite System (GNSS) deformation monitoring system demonstrated that: (1) the Kalman filter is capable of denoising the bridge deformation monitoring data; (2) the prediction accuracy of the proposed Kalman-ARIMA-GARCH model is satisfactory, where the mean absolute error increases only from 3.402 mm to 5.847 mm with the increment of the prediction step; and (3) in comparision to the Kalman-ARIMA model, the Kalman-ARIMA-GARCH model results in superior prediction accuracy as it includes partial nonlinear characteristics (heteroscedasticity); the mean absolute error of five-step prediction using the proposed model is improved by 10.12%. This paper provides a new way for structural behavior prediction based on data processing, which can lay a foundation for the early warning of bridge health monitoring system based on sensor data using sensing technology. PMID:29351254

  18. A case of bilateral vocal fold mucosal bridges, bilateral trans-vocal fold type III sulci vocales, and an intracordal polyp.

    PubMed

    Tan, Melin; Pitman, Michael J

    2011-07-01

    We present a patient with a novel finding of bilateral mucosal bridges, bilateral type III trans-vocal fold sulci vocales, and a vocal fold polyp. Although sulci and mucosal bridges occur in the vocal folds, it is rare to find multiples of these lesions in a single patient, and it is even more uncommon when they occur in conjunction with a vocal fold polyp. To our knowledge, this is the first description of a vocal fold polyp in combination with multiple vocal fold bridges and multiple type III sulci vocales in a single patient. To describe and visually present the diagnosis and treatment of a patient with an intracordal polyp, bilateral mucosal bridges, as well as bilateral type III trans-vocal fold sulci vocales. Presentation of a set of high definition intraoperative photos displaying the extent of the vocal fold lesions and the resection of the intracordal polyp. This patient presented with only 6 months of significant dysphonia. It was felt that the recent change in voice was because of the polyp and not the bridges or sulci vocales. Considering the patient's presentation and the possible morbidity of resection of mucosal bridges and sulci, only the polyp was excised. Postoperatively, the patient's voice returned to his acceptable mild baseline dysphonia, and the benefit has persisted 6 months postoperatively. The combination of bilateral mucosal bridges, bilateral type III sulcus vocalis, and an intracordal polyp in one patient is rare if not novel. Treatment of the polyp alone returned the patient's voice to his lifelong baseline of mild dysphonia. Copyright © 2011 The Voice Foundation. Published by Mosby, Inc. All rights reserved.

  19. Bridge Structure Deformation Prediction Based on GNSS Data Using Kalman-ARIMA-GARCH Model.

    PubMed

    Xin, Jingzhou; Zhou, Jianting; Yang, Simon X; Li, Xiaoqing; Wang, Yu

    2018-01-19

    Bridges are an essential part of the ground transportation system. Health monitoring is fundamentally important for the safety and service life of bridges. A large amount of structural information is obtained from various sensors using sensing technology, and the data processing has become a challenging issue. To improve the prediction accuracy of bridge structure deformation based on data mining and to accurately evaluate the time-varying characteristics of bridge structure performance evolution, this paper proposes a new method for bridge structure deformation prediction, which integrates the Kalman filter, autoregressive integrated moving average model (ARIMA), and generalized autoregressive conditional heteroskedasticity (GARCH). Firstly, the raw deformation data is directly pre-processed using the Kalman filter to reduce the noise. After that, the linear recursive ARIMA model is established to analyze and predict the structure deformation. Finally, the nonlinear recursive GARCH model is introduced to further improve the accuracy of the prediction. Simulation results based on measured sensor data from the Global Navigation Satellite System (GNSS) deformation monitoring system demonstrated that: (1) the Kalman filter is capable of denoising the bridge deformation monitoring data; (2) the prediction accuracy of the proposed Kalman-ARIMA-GARCH model is satisfactory, where the mean absolute error increases only from 3.402 mm to 5.847 mm with the increment of the prediction step; and (3) in comparision to the Kalman-ARIMA model, the Kalman-ARIMA-GARCH model results in superior prediction accuracy as it includes partial nonlinear characteristics (heteroscedasticity); the mean absolute error of five-step prediction using the proposed model is improved by 10.12%. This paper provides a new way for structural behavior prediction based on data processing, which can lay a foundation for the early warning of bridge health monitoring system based on sensor data using sensing technology.

  20. A Course-Based Undergraduate Research Experience Investigating p300 Bromodomain Mutations

    ERIC Educational Resources Information Center

    Shanle, Erin K.; Tsun, Ian K.; Strahl, Brian D.

    2016-01-01

    Course-based undergraduate research experiences (CUREs) provide an opportunity for students to engage in experiments with outcomes that are unknown to both the instructor and students. These experiences allow students and instructors to collaboratively bridge the research laboratory and classroom, and provide research experiences for a large…

  1. 4. Photocopy of photograph, original negative in the possession of ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    4. Photocopy of photograph, original negative in the possession of John R. Morison, Peterborough, New Hampshire. Photographer unknown, 14 September 1888. INSIDE CAISSON PIER IV, 60 FEET BELOW WATER LINE, 25 POUNDS AIR PRESSURE - Sioux City Bridge, Spanning the Missouri River, Sioux City, Woodbury County, IA

  2. Application of 3D Laser Scanning Technology in Complex Rock Foundation Design

    NASA Astrophysics Data System (ADS)

    Junjie, Ma; Dan, Lu; Zhilong, Liu

    2017-12-01

    Taking the complex landform of Tanxi Mountain Landscape Bridge as an example, the application of 3D laser scanning technology in the mapping of complex rock foundations is studied in this paper. A set of 3D laser scanning technologies are formed and several key engineering problems are solved. The first is 3D laser scanning technology of complex landforms. 3D laser scanning technology is used to obtain a complete 3D point cloud data model of the complex landform. The detailed and accurate results of the surveying and mapping decrease the measuring time and supplementary measuring times. The second is 3D collaborative modeling of the complex landform. A 3D model of the complex landform is established based on the 3D point cloud data model. The super-structural foundation model is introduced for 3D collaborative design. The optimal design plan is selected and the construction progress is accelerated. And the last is finite-element analysis technology of the complex landform foundation. A 3D model of the complex landform is introduced into ANSYS for building a finite element model to calculate anti-slide stability of the rock, and provides a basis for the landform foundation design and construction.

  3. C-17 on Runway

    NASA Image and Video Library

    2013-11-13

    A U.S. Air Force C-17 transport aircraft sits on the sea ice runway at the National Science Foundation's McMurdo Station in Antarctica following a transit flight from Christchurch, New Zealand that transported IceBridge personnel and gear on Nov. 12, 2013. The C-17 aircraft that fly to Antarctica are operated by the U.S. Air Force's 62nd and 446th Airlift Wings based at Joint Base Lewis-McChord near Seattle, Wash. Credit: NASA/Goddard/George Hale NASA's Operation IceBridge is an airborne science mission to study Earth's polar ice. For more information about IceBridge, visit: www.nasa.gov/icebridge NASA image use policy. NASA Goddard Space Flight Center enables NASA’s mission through four scientific endeavors: Earth Science, Heliophysics, Solar System Exploration, and Astrophysics. Goddard plays a leading role in NASA’s accomplishments by contributing compelling scientific knowledge to advance the Agency’s mission. Follow us on Twitter Like us on Facebook Find us on Instagram

  4. Photographic copy of circa 1935, black and white, 10” x ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa 1935, black and white, 10” x 14” photograph. Located loose in oversized box at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. Obtained from Rochester, New York, Mrs. (Not Legible) Hagan Bentz, National Librarian Home, Washington, D.C., March 1967. CIRCA 1935 PHOTOGRAPH OF THE FIRST PASSENGER TRAIN TO CROSS THE BRIDGE FROM WEST BANK APPROACH LOOKING NORTH TOWARD EAST BANK. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  5. Photographic copy of 3 ½” x 5” glass lantern slide ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of 3 ½” x 5” glass lantern slide no. 5A of June 1926 and November 1930 drawing by Ralph Modjeski, Consulting Engineer. Located in wooden pine box #23 in box 84 of 94 at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original photographer unknown. JUNE 1926 AND NOVEMBER 1930 DRAWING OF “PROPOSED BRIDGE OVER THE MISSISSIPPI RIVER NORTH OF NEW ORLEANS, LOUISIANA, PLAN “E”. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  6. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. MAY 20, 1933 PHOTOGRAPH NO. 12 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE FALSEWORK MATERIAL READY FOR USE. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  7. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5”archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. MAY 5, 1933 PHOTOGRAPH NO. 10 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE PILE RIG AT PIER C. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  8. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. MAY 12, 1933 PHOTOGRAPH NO. 11 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE FALSEWORK AT PIER V. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  9. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. MAY 28, 1934 PHOTOGRAPH NO. 164 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE PIER A COMPLETE. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  10. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. NOVEMBER 28, 1934 PHOTOGRAPH NO. 198 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE GENERAL VIEW OF PIERS. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  11. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1935, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. AUGUST 12, 1935 PHOTOGRAPH NO. 133 OF CONTRACT NO. 4 SHOWING GENERAL VIEW OF EAST APPROACH TO BRIDGE. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  12. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4 x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. NOVEMBER 13, 1933 PHOTOGRAPH NO. 72 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE PIER II SECOND LIFT OF FORMS. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  13. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. OCTOBER 22, 1934 PHOTOGRAPH NO. 41 OF CONTRACT NO. 4 SHOWING BRIDGE SUPERSTRUCTURE STEEL ERECTION AT PIER II. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  14. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. NOVEMBER 28, 1934 PHOTOGRAPH NO. 199 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE GENERAL VIEW OF PIERS. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  15. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. APRIL 30, 1934 PHOTOGRAPH NO. 151 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE CONCRETING SHAFT AT PIER III. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  16. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. NOVEMBER 6, 1933 PHOTOGRAPH NO. 67 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE SHAFT PIER C. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  17. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. NOVEMBER 26, 1933 PHOTOGRAPH NO. 78 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE SETTING GRANITE ON PIER V. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  18. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. JANUARY 8, 1934 PHOTOGRAPH NO. 97 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE PIER C COMPLETED. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  19. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. SEPTEMBER 5, 1933 PHOTOGRAPH NO. 31 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE ERECTION OF SHELL. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  20. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. MARCH 19, 1934 PHOTOGRAPH NO. 134 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE ERECTING FORMS PIER D. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  1. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1935, 8” x 10” black and white photographic negative. New 4” X 5”inch archival negative made from print. Original photographer unknown. Original 8” X 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. NOVEMBER 4, 1935 PHOTOGRAPH NO. 151 OF CONTRACT NO. 4 SHOWING PORTAL OF MAIN CANTILEVER BRIDGE. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  2. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. OCTOBER 15, 1934 PHOTOGRAPH NO. 192 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE TOPPING OUT AT PIER I. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  3. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. DECEMBER 4, 1933 PHOTOGRAPH NO. 80 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE CONCRETING SHAFT AT PIER C. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  4. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. MAY 15, 1934 PHOTOGRAPH NO. 156 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE SHAFT FORMS PIER II. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  5. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. JUNE 18, 1934 PHOTOGRAPH NO. 170 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE PIER III COMPLETE. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  6. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. DECEMBER 26, 1933 PHOTOGRAPH NO. 91 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE EXCAVATING AROUND PILES, PIER D. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  7. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. DECEMBER 11, 1933 PHOTOGRAPH NO. 83 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE COPING FORMS AT PIER C. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  8. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. DECEMBER 4, 1933 PHOTOGRAPH NO. 81 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE EXCAVATING PIER B. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  9. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. DECEMBER 18, 1933 PHOTOGRAPH NO. 87 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE SAND ISLAND FILL PIER I. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  10. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. JANUARY 15, 1934 PHOTOGRAPH NO. 102 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE BUILDING COFFERDAM AT PIER A. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  11. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. JULY 16, 1934 PHOTOGRAPH NO. 179 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE DREDGING PIER IV. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  12. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. JUNE 25, 1934 PHOTOGRAPH NO. 172 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE CONCRETING COPING PIER II. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  13. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1935, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. JANUARY 7, 1935 PHOTOGRAPH NO. 64 OF CONTRACT NO. 4 SHOWING BRIDGE SUPERSTRUCTURE STEEL ERECTION PIER I. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  14. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. JANUARY 22, 1934 PHOTOGRAPH NO. 107 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE ERECTING COFFERDAM AT PIER III. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  15. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. FEBRUARY 5, 1934 PHOTOGRAPH NO. 114 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE PIER NO. V. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  16. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. APRIL 30, 1934 PHOTOGRAPH NO. 150 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE PIER D COMPLETE. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  17. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. DECEMBER 31, 1934 PHOTOGRAPH NO. 61 OF CONTRACT NO. 4 SHOWING BRIDGE SUPERSTRUCTURE UPSTREAM CONCRETE ROADWAY. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  18. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. DECEMBER 11, 1933 PHOTOGRAPH NO. 85 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE SETTING GRANITE ON RIVER PIER. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  19. Formation of lamellar cross bridges in the annulus fibrosus of the intervertebral disc is a consequence of vascular regression.

    PubMed

    Smith, Lachlan J; Elliott, Dawn M

    2011-05-01

    Cross bridges are radial structures within the highly organized lamellar structure of the annulus fibrosus of the intervertebral disc that connect two or more non-consecutive lamellae. Their origin and function are unknown. During fetal development, blood vessels penetrate deep within the AF and recede during postnatal growth. We hypothesized that cross bridges are the pathways left by these receding blood vessels. Initially, the presence of cross bridges was confirmed in cadaveric human discs aged 25 and 53 years. Next, L1-L2 intervertebral discs (n=4) from sheep ranging in age from 75 days fetal gestation to adult were processed for paraffin histology. Mid-sagittal sections were immunostained for endothelial cell marker PECAM-1. The anterior and posterior AF were imaged using differential interference contrast microscopy, and the following parameters were quantified: total number of distinct lamellae, total number of cross bridges, percentage of cross bridges staining positive for PECAM-1, cross bridge penetration depth (% total lamellae), and PECAM-1 positive cross bridge penetration depth. Cross bridges were first observed at 100 days fetal gestation. The overall number peaked in neonates then remained relatively unchanged. The percentage of PECAM-1 positive cross bridges declined progressively from almost 100% at 100 days gestation to less than 10% in adults. Cross bridge penetration depth peaked in neonates then remained unchanged at subsequent ages. Depth of PECAM-1 positive cross bridges decreased progressively after birth. Findings were similar for both the anterior and posterior. The AF lamellar architecture is established early in development. It later becomes disrupted as a consequence of vascularization. Blood vessels then recede, perhaps due to increasing mechanical stresses in the surrounding matrix. In this study we present evidence that the pathways left by receding blood vessels remain as lamellar cross bridges. It is unclear whether the presence of cross bridges in the aging and degenerating intervertebral disc would be advantageous or detrimental, and this question should be addressed by future studies. Copyright © 2011 International Society of Matrix Biology. Published by Elsevier B.V. All rights reserved.

  20. How Do Preservice Teachers Understand the Use of Research to Inform Practice? Foundational Knowledge for Bridging the Gap

    ERIC Educational Resources Information Center

    van Ingen, Sarah; Alvarez McHatton, Patricia; Vomvoridi-Ivanovic, Eugenia

    2016-01-01

    Despite widespread discourse about the need for teachers to utilize education research, little is known about how teachers learn to engage in this practice. How do preservice teachers understand the use of research to inform their teaching? Set within the context of a mathematics methods course, this study provides a detailed analysis of the…

  1. Shockwave generation by a semiconductor bridge operation in water

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zvulun, E.; Toker, G.; Gurovich, V. Tz.

    2014-05-28

    A semiconductor bridge (SCB) is a silicon device, used in explosive systems as the electrical initiator element. In recent years, SCB plasma has been extensively studied, both electrically and using fast photography and spectroscopic imaging. However, the value of the pressure buildup at the bridge remains unknown. In this study, we operated SCB devices in water and, using shadow imaging and reference beam interferometry, obtained the velocity of the shock wave propagation and distribution of the density of water. These results, together with a self-similar hydrodynamic model, were used to calculate the pressure generated by the exploding SCB. In addition,more » the results obtained showed that the energy of the water flow exceeds significantly the energy deposited into the exploded SCB. The latter can be explained by the combustion of the aluminum and silicon atoms released in water, which acts as an oxidizing medium.« less

  2. 81. VIEW OF VAL LOOKING NORTH AS SEEN FROM THE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    81. VIEW OF VAL LOOKING NORTH AS SEEN FROM THE RESERVOIR SHOWING TWO LAUNCHING TUBES ON THE LAUNCHER BRIDGE, Date unknown, circa 1952. (Original photograph in possession of Dave Willis, San Diego, California.) - Variable Angle Launcher Complex, Variable Angle Launcher, CA State Highway 39 at Morris Reservior, Azusa, Los Angeles County, CA

  3. Radical Connections: A Journey through Social Histories, Biography and Politics

    ERIC Educational Resources Information Center

    Martin, Jane

    2010-01-01

    This lecture will revisit nineteenth and twentieth century education policy and politics in the light of the experiences and struggles of a (nowadays) virtually unknown educator activist. Beautiful, tireless, courageous and principled, socialist school teacher Mary Bridges Adams (1855-1939) gave up her life for the Cause. Encouraged by William…

  4. Probabilistic Teleportation of Two-Particle State of General Formation

    NASA Astrophysics Data System (ADS)

    Yan, Feng-Li; Tan, Hong-Ge; Yang, Lin-Guang

    2002-06-01

    A scheme for probabilistic teleporting an unknown two-particle state of general formation by partly pure entangled four-particle state is proposed. It is shown that after performing two Bell state measurements, proper unitary transformation and the measurement on an auxiliary qubit, the unknown two-particle state of general formation, which was destroyed at one place, can be reconstructed at another place with certain probability. The project supported by Natural Science Foundation of Hebei Province of China

  5. X-ray diffraction evidence for myosin-troponin connections and tropomyosin movement during stretch activation of insect flight muscle

    PubMed Central

    Perz-Edwards, Robert J.; Irving, Thomas C.; Baumann, Bruce A. J.; Gore, David; Hutchinson, Daniel C.; Kržič, Uroš; Porter, Rebecca L.; Ward, Andrew B.; Reedy, Michael K.

    2011-01-01

    Stretch activation is important in the mechanical properties of vertebrate cardiac muscle and essential to the flight muscles of most insects. Despite decades of investigation, the underlying molecular mechanism of stretch activation is unknown. We investigated the role of recently observed connections between myosin and troponin, called “troponin bridges,” by analyzing real-time X-ray diffraction “movies” from sinusoidally stretch-activated Lethocerus muscles. Observed changes in X-ray reflections arising from myosin heads, actin filaments, troponin, and tropomyosin were consistent with the hypothesis that troponin bridges are the key agent of mechanical signal transduction. The time-resolved sequence of molecular changes suggests a mechanism for stretch activation, in which troponin bridges mechanically tug tropomyosin aside to relieve tropomyosin’s steric blocking of myosin–actin binding. This enables subsequent force production, with cross-bridge targeting further enhanced by stretch-induced lattice compression and thick-filament twisting. Similar linkages may operate in other muscle systems, such as mammalian cardiac muscle, where stretch activation is thought to aid in cardiac ejection. PMID:21148419

  6. 5. Photocopy of photograph (original print located in LBNL Photo ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. Photocopy of photograph (original print located in LBNL Photo Lab Collection). Photographer unknown. August 25, 1950. BEV-307. BEVATRON MAGNET FOUNDATION. B-51 - University of California Radiation Laboratory, Bevatron, 1 Cyclotron Road, Berkeley, Alameda County, CA

  7. Computational mechanics research and support for aerodynamics and hydraulics at TFHRC. Quarterly report January through March 2011. Year 1 Quarter 2 progress report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lottes, S. A.; Kulak, R. F.; Bojanowski, C.

    2011-05-19

    This project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at the Turner-Fairbank Highway Research Center for a period of five years, beginning in October 2010. The analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focusmore » of the project are wind and water loads on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to assess them for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, vehicle stability under high wind loading, and the use of electromagnetic shock absorbers to improve vehicle stability under high wind conditions. This quarterly report documents technical progress on the project tasks for the period of January through March 2011.« less

  8. New analogs of the CART peptide with anorexigenic potency: the importance of individual disulfide bridges.

    PubMed

    Blechová, Miroslava; Nagelová, Veronika; Záková, Lenka; Demianová, Zuzana; Zelezná, Blanka; Maletínská, Lenka

    2013-01-01

    The CART (cocaine- and amphetamine-regulated transcript) peptide is an anorexigenic neuropeptide that acts in the hypothalamus. The receptor and the mechanism of action of this peptide are still unknown. In our previous study, we showed that the CART peptide binds specifically to PC12 rat pheochromocytoma cells in both the native and differentiated into neuronal phenotype. Two biologically active forms, CART(55-102) and CART(61-102), with equal biological activity, contain three disulfide bridges. To clarify the importance of each of these disulfide bridges in maintaining the biological activity of CART(61-102), an Ala scan at particular S-S bridges forming cysteines was performed, and analogs with only one or two disulfide bridges were synthesized. In this study, a stabilized CART(61-102) analog with norleucine instead of methionine at position 67 was also prepared and was found to bind to PC12 cells with an anorexigenic potency similar to that of CART(61-102). The binding study revealed that out of all analogs tested, [Ala(68,86)]CART(61-102), which contains two disulfide bridges (positions 74-94 and 88-101), preserved a high affinity to both native PC12 cells and those that had been differentiated into neurons. In food intake and behavioral tests with mice after intracerebroventricular administration, this analog showed strong and long-lasting anorexigenic potency. Therefore, the disulfide bridge between cysteines 68 and 86 in CART(61-102) can be omitted without a loss of biological activity, but the preservation of two other disulfide bridges and the full-length peptide are essential for biological activity. Copyright © 2012 Elsevier Inc. All rights reserved.

  9. Bridging the Gap between Preservice Early Childhood Teachers' Cultural Values, Perceptions of Values Held by Scientists, and the Relationships of These Values to Conceptions of Nature of Science

    ERIC Educational Resources Information Center

    Akerson, Valarie L.; Buzzelli, Cary A.; Eastwood, Jennifer L.

    2012-01-01

    This study explored preservice teachers' views of their own cultural values, the cultural values they believed scientists hold, and the relationships of these views to their conceptions of nature of science (NOS). Parallel assignments in a foundations of early childhood education and a science methods course required preservice teachers to explore…

  10. The Red Book and clinical practice.

    PubMed

    Bygott, Catherine

    2012-09-01

    Jung's work is fundamentally an experience, not an idea. From this perspective, I attempt to bridge conference, consulting room and living psyche by considering the influence of the 'Red Book' on clinical practice through the subtle and imaginal. Jung's journey as a man broadens out to have relevance for women. His story is individual but its archetypal foundation finds parallel expression in analytic practice today. © 2012, The Society of Analytical Psychology.

  11. 76. AVALON DAM Photographic copy of historic photo, 1939 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    76. AVALON DAM - Photographic copy of historic photo, 1939 (original print in '1939 Annual Report of the Carlsbad Project,' located at the Carlsbad Irrigation District offices, Carlsbad, New Mexico) photographer unknown VIEW OF CCC WORKERS COMPLETING CONSTRUCTION OF SUSPENSION BRIDGE - Carlsbad Irrigation District, Avalon Dam, On Pecos River, 4 miles North of Carlsbad, Carlsbad, Eddy County, NM

  12. AltitudeOmics: the integrative physiology of human acclimatization to hypobaric hypoxia and its retention upon reascent.

    PubMed

    Subudhi, Andrew W; Bourdillon, Nicolas; Bucher, Jenna; Davis, Christopher; Elliott, Jonathan E; Eutermoster, Morgan; Evero, Oghenero; Fan, Jui-Lin; Jameson-Van Houten, Sonja; Julian, Colleen G; Kark, Jonathan; Kark, Sherri; Kayser, Bengt; Kern, Julia P; Kim, See Eun; Lathan, Corinna; Laurie, Steven S; Lovering, Andrew T; Paterson, Ryan; Polaner, David M; Ryan, Benjamin J; Spira, James L; Tsao, Jack W; Wachsmuth, Nadine B; Roach, Robert C

    2014-01-01

    An understanding of human responses to hypoxia is important for the health of millions of people worldwide who visit, live, or work in the hypoxic environment encountered at high altitudes. In spite of dozens of studies over the last 100 years, the basic mechanisms controlling acclimatization to hypoxia remain largely unknown. The AltitudeOmics project aimed to bridge this gap. Our goals were 1) to describe a phenotype for successful acclimatization and assess its retention and 2) use these findings as a foundation for companion mechanistic studies. Our approach was to characterize acclimatization by measuring changes in arterial oxygenation and hemoglobin concentration [Hb], acute mountain sickness (AMS), cognitive function, and exercise performance in 21 subjects as they acclimatized to 5260 m over 16 days. We then focused on the retention of acclimatization by having subjects reascend to 5260 m after either 7 (n = 14) or 21 (n = 7) days at 1525 m. At 16 days at 5260 m we observed: 1) increases in arterial oxygenation and [Hb] (compared to acute hypoxia: PaO2 rose 9±4 mmHg to 45±4 while PaCO2 dropped a further 6±3 mmHg to 21±3, and [Hb] rose 1.8±0.7 g/dL to 16±2 g/dL; 2) no AMS; 3) improved cognitive function; and 4) improved exercise performance by 8±8% (all changes p<0.01). Upon reascent, we observed retention of arterial oxygenation but not [Hb], protection from AMS, retention of exercise performance, less retention of cognitive function; and noted that some of these effects lasted for 21 days. Taken together, these findings reveal new information about retention of acclimatization, and can be used as a physiological foundation to explore the molecular mechanisms of acclimatization and its retention.

  13. AltitudeOmics: The Integrative Physiology of Human Acclimatization to Hypobaric Hypoxia and Its Retention upon Reascent

    PubMed Central

    Subudhi, Andrew W.; Bourdillon, Nicolas; Bucher, Jenna; Davis, Christopher; Elliott, Jonathan E.; Eutermoster, Morgan; Evero, Oghenero; Fan, Jui-Lin; Houten, Sonja Jameson-Van; Julian, Colleen G.; Kark, Jonathan; Kark, Sherri; Kayser, Bengt; Kern, Julia P.; Kim, See Eun; Lathan, Corinna; Laurie, Steven S.; Lovering, Andrew T.; Paterson, Ryan; Polaner, David M.; Ryan, Benjamin J.; Spira, James L.; Tsao, Jack W.; Wachsmuth, Nadine B.; Roach, Robert C.

    2014-01-01

    An understanding of human responses to hypoxia is important for the health of millions of people worldwide who visit, live, or work in the hypoxic environment encountered at high altitudes. In spite of dozens of studies over the last 100 years, the basic mechanisms controlling acclimatization to hypoxia remain largely unknown. The AltitudeOmics project aimed to bridge this gap. Our goals were 1) to describe a phenotype for successful acclimatization and assess its retention and 2) use these findings as a foundation for companion mechanistic studies. Our approach was to characterize acclimatization by measuring changes in arterial oxygenation and hemoglobin concentration [Hb], acute mountain sickness (AMS), cognitive function, and exercise performance in 21 subjects as they acclimatized to 5260 m over 16 days. We then focused on the retention of acclimatization by having subjects reascend to 5260 m after either 7 (n = 14) or 21 (n = 7) days at 1525 m. At 16 days at 5260 m we observed: 1) increases in arterial oxygenation and [Hb] (compared to acute hypoxia: PaO2 rose 9±4 mmHg to 45±4 while PaCO2 dropped a further 6±3 mmHg to 21±3, and [Hb] rose 1.8±0.7 g/dL to 16±2 g/dL; 2) no AMS; 3) improved cognitive function; and 4) improved exercise performance by 8±8% (all changes p<0.01). Upon reascent, we observed retention of arterial oxygenation but not [Hb], protection from AMS, retention of exercise performance, less retention of cognitive function; and noted that some of these effects lasted for 21 days. Taken together, these findings reveal new information about retention of acclimatization, and can be used as a physiological foundation to explore the molecular mechanisms of acclimatization and its retention. PMID:24658407

  14. Bridging Differences -- how Social Relationships and Racial Diversity Matter in a Girls' Technology Program

    NASA Astrophysics Data System (ADS)

    Kekelis, Linda S.; Ancheta, Rebecca Wepsic; Heber, Etta; Countryman, Jeri

    In this article, we explore an understudied dimension of girls' single-sex education - how social relationships and racial diversity impact the educational environment for girls, and how teachers may best address these concerns. Findings are presented from a 3-year qualitative study of girls' experiences in a single-sex technology program. Girls valued the all-girls aspect of the programs, and friendships formed the foundation of their social experiences. Girls' friendship groups influenced their experiences and eventually their success in the after school technology programs. When friendship groups were observed to be racially homogeneous, they created challenges for including and supporting a racially diverse student membership. Our responses to the challenges that cultural differences and tensions present are outlined, along with recommendations for helping girls bridge these differences.

  15. Original analytic solution of a half-bridge modelled as a statically indeterminate system

    NASA Astrophysics Data System (ADS)

    Oanta, Emil M.; Panait, Cornel; Raicu, Alexandra; Barhalescu, Mihaela

    2016-12-01

    The paper presents an original computer based analytical model of a half-bridge belonging to a circular settling tank. The primary unknown is computed using the force method, the coefficients of the canonical equation being calculated using either the discretization of the bending moment diagram in trapezoids, or using the relations specific to the polygons. A second algorithm based on the method of initial parameters is also presented. Analyzing the new solution we came to the conclusion that most of the computer code developed for other model may be reused. The results are useful to evaluate the behavior of the structure and to compare with the results of the finite element models.

  16. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. MAY 26, 1933 PHOTOGRAPH NO. 13 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE DRIVING SHEET PILING AT PIER V. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  17. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. FEBRUARY 24, 1933 PHOTOGRAPH NO. 1 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE CONSTRUCTION TRESTLE ON EAST BANK LOOKING SOUTHEAST TOWARD WEST BANK. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  18. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. APRIL 3, 1933 PHOTOGRAPH NO. 6 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE WILLOW TREE MATTRESS FOR PIER NO. 1. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  19. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. APRIL 7, 1933 PHOTOGRAPH NO. 7 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE BORING RIG AT PIER I DOWNSTREAM. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  20. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. MAY 28, 1934 PHOTOGRAPH NO. 162 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE GENERAL VIEW OF PIERS A TO IV. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  1. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5”archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. OCTOBER 23, 1934 PHOTOGRAPH NO. 193 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE – CONCRETE PLANT AT PIER IV. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  2. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. NOVEMBER 5, 1934 PHOTOGRAPH NO. 43 OF CONTRACT NO. 4 SHOWING BRIDGE SUPERSTRUCTURE CANTILEVER STRUCTURE ERECTION AT PIER II. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  3. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. OCTOBER 2, 1933 PHOTOGRAPH NO. 45 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE PLACING COFFERDAM AT PIER NO. V. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  4. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. SEPTEMBER 25, 1933 PHOTOGRAPH NO. 41 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE PLACING SAND ISLAND FILL AT PIER NO. III. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  5. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. NOVEMBER 13, 1933 PHOTOGRAPH NO. 69 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE DREDGING THIRD LIFT OF CAISSON AT PIER III. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  6. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. NOVEMBER 6, 1933 PHOTOGRAPH NO. 68 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE PIER II FIRST LIFT OF FORMS. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  7. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. OCTOBER 11, 1933 PHOTOGRAPH NO. 49 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE CONSTRUCTION OF FOOTING AT PIER C. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  8. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. MARCH 12, 1934 PHOTOGRAPH NO. 130 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE DRIVING FALSEWORK PILES AT PIER IV. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  9. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1935, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. JANUARY 28, 1935 PHOTOGRAPH NO. 70 OF CONTRACT NO. 4 SHOWING BRIDGE SUPERSTRUCTURE DISMANTLING FASLEWORK BENT AT LA 8 EAST ANCHOR ARM. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  10. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. SEPTEMBER 25, 1933 PHOTOGRAPH NO. 42 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE REMOVAL OF FORMS AT CAISSON PIER NO. V. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  11. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. FEBRUARY 5, 1934 PHOTOGRAPH NO. 112 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE SETTING CUTTING EDGE AT PIER I. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  12. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. NOVEMBER 20, 1933 PHOTOGRAPH NO. 73 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE TOP OF CAISSON AT ELEVATION -35.O FEET. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  13. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. OCTOBER 23, 1933 PHOTOGRAPH NO. 59 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE PLACING OF CUTTING EDGE AT PIER A. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  14. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. OCTOBER 29, 1934 PHOTOGRAPH NO. 194 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE ERECTING SHAFT FORMS AT PIER IV. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  15. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. MARCH 27, 1934 PHOTOGRAPH NO. 4 OF CONTRACT NO. 4 SHOWING BRIDGE SUPERSTRUCTURE START OF PLACING ERECTING DERRICK SPAN V-B. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  16. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. NOVEMBER 20, 1933 PHOTOGRAPH NO. 75 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE SETTING FORMS FOR SHAFT PIER C. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  17. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. MAY 15, 1934 PHOTOGRAPH NO. 8 OF CONTRACT NO. 4 SHOWING BRIDGE SUPERSTRUCTURE SPAN BETWEEN PIERS V AND B. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  18. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. FEBRUARY 19, 1934 PHOTOGRAPH NO. 118 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE CUTTING EDGE FORMS AT PIER I. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  19. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. FEBRUARY 26, 1934 PHOTOGRAPH NO. 124 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE ERECTING FORMS AT PIER SHAFT PIER A. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  20. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. OCTOBER 30, 1933 PHOTOGRAPH NO. 62 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE DRIVING SHEET PILING AT PIER B. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  1. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. APRIL 23, 1934 PHOTOGRAPH NO. 8 OF CONTRACT NO. 4 SHOWING BRIDGE SUPERSTRUCTURE FALSEWORK BENT THAT WAS SCOURED OUT BETWEEN PIER IV AND V. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  2. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. OCTOBER 17, 1933 PHOTOGRAPH NO. 57A OF CONTRACT NO. 3 SHOWING MAIN BRIDGE PLACING OF SAND FILL AT PIER NO. II. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  3. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. OCTOBER 23, 1933 PHOTOGRAPH NO. 58 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE PLACING OF CUTTING EDGE AT PIER NO. II. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  4. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. DECEMBER 4, 1934 PHOTOGRAPH NO. 50 OF CONTRACT NO. 4 SHOWING BRIDGE SUPERSTRUCTURE ERECTING FALSEWORK BENT WEST ANCHOR ARM. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  5. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. AUGUST 6, 1934 PHOTOGRAPH NO. 26 OF CONTRACT NO. 4 SHOWING BRIDGE SUPERSTRUCTURE ERECTING HIGHWAY STEEL SPAN BETWEEN PIERS B AND C. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  6. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. AUGUST 28, 1933 PHOTOGRAPH NO. 29 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE PLACING OF WELL FORMS AT PIER NO. IV. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  7. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1933, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. OCTOBER 30, 1933 PHOTOGRAPH NO. 62 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE DRIVING SHEET PILING AT PIER A. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  8. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. NOVEMBER 5, 1934 PHOTOGRAPH NO. 44 OF CONTRACT NO. 4 SHOWING BRIDGE SUPERSTRUCTURE ERECTING HIGHWAY FORMS UPSTREAM ROADWAY BETWEEN PIERS V TO D. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  9. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. AUGUST 6, 1934 PHOTOGRAPH NO. 27 OF CONTRACT NO. 4 SHOWING BRIDGE SUPERSTRUCTURE FALSEWORK BEND AND DERRICK AT PIER II. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  10. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. FEBRUARY 12, 1934 PHOTOGRAPH NO. 116 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE SETTING SHAFT FORM AT PIER III. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  11. 8” x 10” black and white photographic print made from ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” black and white photographic print made from original 1934, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. JANUARY 22, 1934 PHOTOGRAPH NO. 106 OF CONTRACT NO. 3 SHOWING MAIN BRIDGE ERECTING COPING FORMS AT PIER V. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  12. 8” x 10” and white photographic print made from original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8” x 10” and white photographic print made from original 1935, 8” x 10” black and white photographic negative. New 4” x 5” archival negative made from print. Original photographer unknown. Original 8” x 10” negative located in the files of the New Orleans Public Belt Railroad administrative offices at 5100 Jefferson Highway, Jefferson, LA 70123. JANUARY 28, 1935 PHOTOGRAPH NO. 72 OF CONTRACT NO. 4 SHOWING BRIDGE SUPERSTRUCTURE COMPLETED HIGHWAY SLAB BETWEEN PIERS V TO B. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  13. Damage assessment of bridge infrastructure subjected to flood-related hazards

    NASA Astrophysics Data System (ADS)

    Michalis, Panagiotis; Cahill, Paul; Bekić, Damir; Kerin, Igor; Pakrashi, Vikram; Lapthorne, John; Morais, João Gonçalo Martins Paulo; McKeogh, Eamon

    2017-04-01

    Transportation assets represent a critical component of society's infrastructure systems. Flood-related hazards are considered one of the main climate change impacts on highway and railway infrastructure, threatening the security and functionality of transportation systems. Of such hazards, flood-induced scour is a primarily cause of bridge collapses worldwide and one of the most complex and challenging water flow and erosion phenomena, leading to structural instability and ultimately catastrophic failures. Evaluation of scour risk under severe flood events is a particularly challenging issue considering that depth of foundations is very difficult to evaluate in water environment. The continual inspection, assessment and maintenance of bridges and other hydraulic structures under extreme flood events requires a multidisciplinary approach, including knowledge and expertise of hydraulics, hydrology, structural engineering, geotechnics and infrastructure management. The large number of bridges under a single management unit also highlights the need for efficient management, information sharing and self-informing systems to provide reliable, cost-effective flood and scour risk management. The "Intelligent Bridge Assessment Maintenance and Management System" (BRIDGE SMS) is an EU/FP7 funded project which aims to couple state-of-the art scientific expertise in multidisciplinary engineering sectors with industrial knowledge in infrastructure management. This involves the application of integrated low-cost structural health monitoring systems to provide real-time information towards the development of an intelligent decision support tool and a web-based platform to assess and efficiently manage bridge assets. This study documents the technological experience and presents results obtained from the application of sensing systems focusing on the damage assessment of water-hazards at bridges over watercourses in Ireland. The applied instrumentation is interfaced with an open-source platform that can offer a more economical remote monitoring solution. The results presented in this investigation provide an important guide for a multidisciplinary approach to bridge monitoring and can be used as a benchmark for the field application of cost-effective and robust sensing methods. This will deliver key information regarding the impact of water-related hazards at bridge structures through an integrated structural health monitoring and management system. Acknowledgement: The authors wish to acknowledge the financial support of the European Commission, through the Marie Curie action Industry-Academia Partnership and Pathways Network BRIDGE SMS (Intelligent Bridge Assessment Maintenance and Management System) - FP7-People-2013-IAPP- 612517.

  14. Self-supporting method; an alternative method for steel truss bridge element replacement

    NASA Astrophysics Data System (ADS)

    Arsyad, Muhammad; Sangadji, Senot; As'ad, Sholihin

    2017-11-01

    Steel truss bridge often requires replacement of its element due to serious damage caused by traffic accidents. This replacement is carried out using temporary supporting structure. It would be difficult when the available space for the temporary structure is quite limited and or the position of work is at a high elevation. The self-supporting method is proposed instead of temporary supporting structure. This paper will discuss an innovative method of bridge rehabilitation by utilizing the existing bridge structure. It requires such temporary connecting structure that installed on the existing bridge element, therefore, the forces during replacement process could be transferred to the bridge foundation directly. By taking the case on a steel truss bridge Jetis Salatiga which requires element replacement due to its damages on two main diagonals, a modeling is carried out to get a proper repair method. Structural analysis is conducted for three temporary connecting structure models: “I,” “V,” and triangular model. Stresses and translations that occur in the structure are used as constraints. Bridge bearings are modeled in two different modes: fixed-fixed system and fixed-free one. Temperature load is given in each condition to obtain the appropriate time for execution. The triangular model is chosen as the best one. In the fixed-fixed mode, this method can be carried out in a temperature range 27-28.8° C, while in fixed-free one, the temperature it is allowed between 27-43.4 °C. The D4 is dismantled first by cutting the D4 leaving an area of 1140.2 mm2 or 127 mm web length to enable plastic condition until the D4 collapses. At the beginning of elongation occurs, immediately performed a slowly jacking on a temporary connecting structure so that the force on D4 is gradually transferred to the temporary connecting structure then the D4 and D5 are set in their place.

  15. Breakup Behavior of a Capillary Bridge on a Hydrophobic Stripe Separating Two Hydrophilic Stripes

    NASA Astrophysics Data System (ADS)

    Hartmann, Maximilian; Hardt, Steffen

    2017-11-01

    The breakup dynamics of a capillary bridge on a hydrophobic area between two liquid filaments occupying two parallel hydrophilic stripes is studied experimentally. In addition calculations with the finite-element software Surface Evolver are performed to obtain the corresponding stable minimal surfaces. Droplets of de-ionized water are placed on substrates with alternating hydrophilic and hydrophobic stripes of different width. Their volume decreases by evaporation. This results in a droplet shaped as the letter ``H'' covering two hydrophilic stripes separated by one hydrophobic stripe. The width of the capillary bridge d(t) on the hydrophobic stripe during the breakup process is observed using a high-speed camera mounted on a bright-field microscope. The results of the experiments and the numerical studies show that the critical width dcrit, indicating the point where the capillary bridge becomes unstable, mainly depends on the width ratio of the hydrophilic and hydrophobic stripes. It is found that the time derivative of d(t) first decreases after dcrit has been reached. The final breakup dynamics then follows a t 2 / 3 scaling. We kindly acknowledge the financial support by the German Research Foundation (DFG) within the Collaborative Research Centre 1194 ``Interaction of Transport and Wetting Processes'', Project A02a.

  16. 10. Photocopy of photograph (original print located in LBNL Photo ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photocopy of photograph (original print located in LBNL Photo Lab Collection). Photographer unknown. November 11, 1950. BEV-336. MAGNET CORE SHOWING FOUNDATION AND SUPPORTS. B-51. - University of California Radiation Laboratory, Bevatron, 1 Cyclotron Road, Berkeley, Alameda County, CA

  17. Accessing Talent: The Foundation of a U.S. Army Officer Corps Strategy

    DTIC Science & Technology

    2010-02-01

    strategy grounded in sound theory. ENDNOTES 1. Janet C. Lowe, Warren Buffet Speaks: Wit and Wisdom from the World’s Greatest Investor, New York...is what you get. Warren Buffett1 INTRODUCTION Since its completion in 1883, the Brooklyn Bridge has been a symbol of American ingenuity and...marketing efforts must account for these deviations since they are likely to play an important role in the market for new officer talent

  18. A cross-bridge based model of force depression: Can a single modification address both transient and steady-state behaviors?

    PubMed

    Corr, David T; Herzog, Walter

    2016-03-21

    Force depression (FD), the reduction of isometric force following active shortening, is a phenomenon of skeletal muscle that has received significant attention in biomechanical and physiological literature, yet the mechanisms underlying FD remain unknown. Recent experiments identified a slower rate of force redevelopment with increasing amounts of steady-state FD, suggesting that FD may be caused, at least in part, by a decrease in cross-bridge binding rate (Corr and Herzog, 2005; Koppes et al., 2014). Herein, we develop a cross-bridge based model of FD in which the binding rate function, f, decreases with the mechanical work performed during shortening. This modification incorporates a direct relationship between steady-state FD and muscle mechanical work (Corr and Herzog, 2005; Herzog et al., 2000; Kosterina et al., 2008), and is consistent with a proposed mechanism attributing FD to stress-induced inhibition of cross-bridge attachments (Herzog, 1998; Maréchal and Plaghki, 1979). Thus, for an increase in mechanical work, the model should predict a slower force redevelopment (decreased attachment rate) to a more depressed steady-state force (fewer attached cross-bridges), and a reduction in contractile element stiffness (Ford et al., 1981). We hypothesized that since this modification affects the cross-bridge kinetics, a corresponding model would be able to account for both transient and steady-state FD behaviors. Comparisons to prior experiments (Corr and Herzog, 2005; Herzog et al., 2000; Kosterina et al., 2008) show that both steady-state and transient aspects of FD, as well as the relationship of FD with respect to speed and amplitude of shortening, are well captured by this model. Thus, this relatively simple cross-bridge based model of FD lends support to a mechanism involving the inhibition of cross-bridge binding, and indicates that cross-bridge kinetics may play a critical role in FD. Copyright © 2016 Elsevier Ltd. All rights reserved.

  19. A methodology to predict damage initiation, damage growth and residual strength in titanium matrix composites

    NASA Technical Reports Server (NTRS)

    Bakuckas, J. G., Jr.; Johnson, W. S.

    1994-01-01

    In this research, a methodology to predict damage initiation, damage growth, fatigue life, and residual strength in titanium matrix composites (TMC) is outlined. Emphasis was placed on micromechanics-based engineering approaches. Damage initiation was predicted using a local effective strain approach. A finite element analysis verified the prevailing assumptions made in the formulation of this model. Damage growth, namely, fiber-bridged matrix crack growth, was evaluated using a fiber bridging (FB) model which accounts for thermal residual stresses. This model combines continuum fracture mechanics and micromechanics analyses yielding stress-intensity factor solutions for fiber-bridged matrix cracks. It is assumed in the FB model that fibers in the wake of the matrix crack are idealized as a closure pressure, and an unknown constant frictional shear stress is assumed to act along the debond length of the bridging fibers. This frictional shear stress was used as a curve fitting parameter to the available experimental data. Fatigue life and post-fatigue residual strength were predicted based on the axial stress in the first intact 0 degree fiber calculated using the FB model and a three-dimensional finite element analysis.

  20. Measurement of Vehicle-Bridge-Interaction force using dynamic tire pressure monitoring

    NASA Astrophysics Data System (ADS)

    Chen, Zhao; Xie, Zhipeng; Zhang, Jian

    2018-05-01

    The Vehicle-Bridge-Interaction (VBI) force, i.e., the normal contact force of a tire, is a key component in the VBI mechanism. The VBI force measurement can facilitate experimental studies of the VBI as well as input-output bridge structural identification. This paper introduces an innovative method for calculating the interaction force by using dynamic tire pressure monitoring. The core idea of the proposed method combines the ideal gas law and a basic force model to build a relationship between the tire pressure and the VBI force. Then, unknown model parameters are identified by the Extended Kalman Filter using calibration data. A signal filter based on the wavelet analysis is applied to preprocess the effect that the tire rotation has on the pressure data. Two laboratory tests were conducted to check the proposed method's validity. The effects of different road irregularities, loads and forward velocities were studied. Under the current experiment setting, the proposed method was robust to different road irregularities, and the increase in load and velocity benefited the performance of the proposed method. A high-speed test further supported the use of this method in rapid bridge tests. Limitations of the derived theories and experiment were also discussed.

  1. Estimation of potential bridge scour at bridges on state routes in South Dakota, 2003-07

    USGS Publications Warehouse

    Thompson, Ryan F.; Fosness, Ryan L.

    2008-01-01

    Flowing water can erode (scour) soils and cause structural failure of a bridge by exposing or undermining bridge foundations (abutments and piers). A rapid scour-estimation technique, known as the level-1.5 method and developed by the U.S. Geological Survey, was used to evaluate potential scour at bridges in South Dakota in a study conducted in cooperation with the South Dakota Department of Transportation. This method was used during 2003-07 to estimate scour for the 100-year and 500-year floods at 734 selected bridges managed by the South Dakota Department of Transportation on State routes in South Dakota. Scour depths and other parameters estimated from the level-1.5 analyses are presented in tabular form. Estimates of potential contraction scour at the 734 bridges ranged from 0 to 33.9 feet for the 100-year flood and from 0 to 35.8 feet for the 500-year flood. Abutment scour ranged from 0 to 36.9 feet for the 100-year flood and from 0 to 45.9 feet for the 500-year flood. Pier scour ranged from 0 to 30.8 feet for the 100-year flood and from 0 to 30.7 feet for the 500-year flood. The scour depths estimated by using the level-1.5 method can be used by the South Dakota Department of Transportation and others to identify bridges that may be susceptible to scour. Scour at 19 selected bridges also was estimated by using the level-2 method. Estimates of contraction, abutment, and pier scour calculated by using the level-1.5 and level-2 methods are presented in tabular and graphical formats. Compared to level-2 scour estimates, the level-1.5 method generally overestimated scour as designed, or in a few cases slightly underestimated scour. Results of the level-2 analyses were used to develop regression equations for change in head and average velocity through the bridge opening. These regression equations derived from South Dakota data are compared to similar regression equations derived from Montana and Colorado data. Future level-1.5 scour investigations in South Dakota may benefit from the use of these South Dakota-specific regression equations for estimating change in stream head and average velocity at the bridge.

  2. Crossing the Bridge: Foreign Language Students' Reciprocal Images in (Inter)Cultural Mediation between Portugal and Turkey

    ERIC Educational Resources Information Center

    Basílio, Daniel; Araújo e Sá, Maria Helena; Simões, Ana Raquel

    2016-01-01

    This study intends to highlight the role that Foreign Language Education (FLE), particularly in the Higher Education context, can play so as to contribute to the rapprochement of two distant and still mutually unknown countries such as Portugal and Turkey. In this sense, it ultimately aims at supporting the training of intercultural speakers,…

  3. Assessment of bridge abutment scour and sediment transport under various flow conditions

    NASA Astrophysics Data System (ADS)

    Gilja, Gordon; Valyrakis, Manousos; Michalis, Panagiotis; Bekić, Damir; Kuspilić, Neven; McKeogh, Eamon

    2017-04-01

    Safety of bridges over watercourses can be compromised by flow characteristics and bridge hydraulics. Scour process around bridge foundations can develop rapidly during low-recurrence interval floods when structural elements are exposed to increased flows. Variations in riverbed geometry, as a result of sediment removal and deposition processes, can increase flood-induced hazard at bridge sites with catastrophic failures and destructive consequences for civil infrastructure. The quantification of flood induced hazard on bridge safety generally involves coupled hydrodynamic and sediment transport models (i.e. 2D numerical or physical models) for a range of hydrological events covering both high and low flows. Modelled boundary conditions are usually estimated for their probability of occurrence using frequency analysis of long-term recordings at gauging stations. At smaller rivers gauging station records are scarce, especially in upper courses of rivers where weirs, drops and rapids are common elements of river bathymetry. As a result, boundary conditions that accurately represent flow patterns on modelled river reach cannot be often reliably acquired. Sediment transport process is also more complicated to describe due to its complexity and dependence to local flow field making scour hazard assessment a particularly challenging issue. This study investigates the influence of flow characteristics to the development of scour and sedimentation processes around bridge abutments of a single span masonry arch bridge in south Ireland. The impact of downstream weirs on bridge hydraulics through variation of downstream model domain type is also considered in this study. The numerical model is established based on detailed bathymetry data surveyed along a rectangular grid of 50cm spacing. Acquired data also consist of riverbed morphology and water level variations which are monitored continuously on bridge site. The obtained data are then used to compare and calibrate numerical models for several flood scenarios. The determination of the boundary conditions is followed by physical modelling to investigate the development of scour around bridge elements. The comparison of surveyed data with the obtained numerical and physical modelling results provide an insight of various flow patterns and their influence on riverbed morphology. This can deliver important information needed for assessment of structural risk associated with flood events. Acknowledgement: The authors wish to acknowledge the financial support of the European Commission, through the Marie Curie action Industry-Academia Partnership and Pathways Network BRIDGE SMS (Intelligent Bridge Assessment Maintenance and Management System) - FP7-People-2013-IAPP- 612517.

  4. Computational mechanics research and support for aerodynamics and hydraulics at TFHRC, year 2 quarter 1 progress report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lottes, S.A.; Bojanowski, C.; Shen, J.

    2012-04-09

    The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water effects on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to improve design allowing for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, CFD analysis of the operation of the wind tunnel in the TFHRC wind engineering laboratory. This quarterly report documents technical progress on the project tasks for the period of October through December 2011.« less

  5. Computational mechanics research and support for aerodynamics and hydraulics at TFHRC, year 2 quarter 2 progress report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lottes, S.A.; Bojanowski, C.; Shen, J.

    2012-06-28

    The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water effects on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to improve design allowing for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, CFD analysis of the operation of the wind tunnel in the TFHRC wind engineering laboratory. This quarterly report documents technical progress on the project tasks for the period of January through March 2012.« less

  6. Computational mechanics research and support for aerodynamics and hydraulics at TFHRC, year 1 quarter 3 progress report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lottes, S.A.; Kulak, R.F.; Bojanowski, C.

    2011-08-26

    The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water loads on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to assess them for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, vehicle stability under high wind loading, and the use of electromagnetic shock absorbers to improve vehicle stability under high wind conditions. This quarterly report documents technical progress on the project tasks for the period of April through June 2011.« less

  7. Design and characterization of a piezoelectric sensor for monitoring scour hole evolution

    NASA Astrophysics Data System (ADS)

    Azhari, Faezeh; Tom, Caroline; Benassini, Joseph; Loh, Kenneth J.; Bombardelli, Fabian A.

    2014-03-01

    Scour occurring near bridge piers and abutments jeopardizes the stability and safety of overwater bridges. In fact, bridge scour is responsible for a significant portion of overwater bridge failures in the United States and around the world. As a result, numerous methods have been developed for monitoring bridge scour by measuring scour depth at locations near bridge piers and foundations. Besides visual inspections conducted by trained divers, other technologies include sonar, float-out devices, magnetic sliding collars, tilt sensors, and fiber optics, to name a few. These systems each offer unique advantages, but most of them share fundamental limitations (e.g., high costs, low reliability, limited accuracy, low reliability, etc.) that have limited their implementation in practice. Thus, the goal of this study is to present a low-cost and simple scour depth sensor fabricated using piezoelectric poly(vinylidene fluoride) (PVDF) polymer strips. Unlike current piezoelectric scour sensors that are based on mounting multiple and equidistantly spaced transducers on a rod, the proposed sensor is formed by coating one continuous PVDF film onto a substrate, followed by waterproofing the sensor. The PVDF-based sensor can then be buried in the streambed and at a location where scour depth measurements are desired. When scour occurs and exposes a portion of the PVDF sensor, water flow excites the sensor to cause the generation of a time-varying voltage signal. Since the dynamics of the voltage time history response is related to the exposed length of the sensor, scour depth can be determined. This work presents the design and fabrication of the sensor. Then, the sensor's performance and accuracy is characterized through extensive laboratory testing.

  8. Development of a liquefaction hazard screening tool for caltrans bridge sites

    USGS Publications Warehouse

    Knudsen, K.-L.; Bott, J.D.J.; Woods, M.O.; McGuire, T.L.

    2009-01-01

    We have developed a liquefaction hazard screening tool for the California Department of Transportation (Caltrans) that is being used to evaluate the liquefaction hazard to approximately 13,000 bridge sites in California. Because of the large number of bridge sites to be evaluated, we developed a tool that makes use of parameters not typically considered in site-specific liquefaction investigations. We assessed geologic, topographic, seismic hazard, and subsurface conditions at about 100 sites of past liquefaction in California. Among the parameters we found common to many of these sites are: (a) low elevations, (b) proximity to a water body, and (c) presence of geologically youthful deposits or artificial fill materials. The nature of the study necessitated the use of readily available data, preferably datasets that are consistent across the state. The screening tool we provided to Caltrans makes use of the following parameters: (1) proximity to a water body, (2) whether the bridge crosses a water body, (3) the age of site geologic materials and the environment in which the materials were deposited, as discerned from available digital geologic maps, (4) probabilistic shaking estimates, (5) the site elevation, (6) information from available liquefaction hazard maps [covering the 9-county San Francisco Bay Area and Ventura County] and California Geological Survey (CGS) Zones of Required Investigation. For bridge sites at which subsurface boring data were available (from CGS' existing database), we calculated Displacement Potential Index values using a methodology developed by Allison Faris and Jiaer Wu. Caltrans' staff will use this hazard-screening tool, along with other tools focused on bridges and foundations, to prioritize site-specific investigations. ?? 2009 ASCE.

  9. Evaluation of streambed scour at bridges over tidal waterways in Alaska

    USGS Publications Warehouse

    Conaway, Jeffrey S.; Schauer, Paul V.

    2012-01-01

    The potential for streambed scour was evaluated at 41 bridges that cross tidal waterways in Alaska. These bridges are subject to several coastal and riverine processes that have the potential, individually or in combination, to induce streambed scour or to damage the structure or adjacent channel. The proximity of a bridge to the ocean and water-surface elevation and velocity data collected over a tidal cycle were criteria used to identify the flow regime at each bridge, whether tidal, riverine, or mixed, that had the greatest potential to induce streambed scour. Water-surface elevations measured through at least one tide cycle at 32 bridges were correlated to water levels at the nearest tide station. Asymmetry of the tidal portion of the hydrograph during the outgoing tide at 12 bridges indicated that riverine flows were stored upstream of the bridge during the tidal exchange. This scenario results in greater discharges and velocities during the outgoing tide compared to those on the incoming tide. Velocity data were collected during outgoing tides at 10 bridges that experienced complete flow reversals, and measured velocities during the outgoing tide exceeded the critical velocity required to initiate sediment transport at three sites. The primary risk for streambed scour at most of the sites considered in this study is from riverine flows rather than tidal fluctuations. A scour evaluation for riverine flow was completed at 35 bridges. Scour from riverine flow was not the primary risk for six tidally-controlled bridges and therefore not evaluated at those sites. Field data including channel cross sections, a discharge measurement, and a water-surface slope were collected at the 35 bridges. Channel instability was identified at 14 bridges where measurable scour and or fill were noted in repeated surveys of channel cross sections at the bridge. Water-surface profiles for the 1-percent annual exceedance probability discharge were calculated by using the Hydrologic Engineering Center’s River Analysis System model, and scour depths were calculated using methods recommended by the Federal Highway Administration. Computed contraction-scour depths were greater than 2.0 feet at five bridges and computed pier-scour depths were 4.0 feet or greater at 15 bridges. The potential for streambed scour by both coastal and riverine processes at the bridges considered in this study were evaluated, ranked, and summed to determine a cumulative risk factor for each bridge. Possible factors that could mitigate the scour risks were investigated at 22 bridges that had high individual or cumulative rankings. Mitigating factors such as piers founded in bedrock, deep pier foundations relative to scour depths, and lack of observed scour during field measurements were documented for 13 sites, but additional study and monitoring is needed to better quantify the streambed scour potential for nine sites. Three bridges prone to being affected by storm surges will require more data collection and possibly complex hydrodynamic modeling to accurately quantify the streambed scour potential. Continuous monitoring of water-surface and streambed elevation at one or more piers is needed for two bridges to better understand the tidal and riverine influences on streambed scour.

  10. Influence of Transplant Center Procedural Volume on Survival Outcomes of Heart Transplantation for Children Bridged with Mechanical Circulatory Support.

    PubMed

    Hsieh, Alex; Tumin, Dmitry; McConnell, Patrick I; Galantowicz, Mark; Tobias, Joseph D; Hayes, Don

    2017-02-01

    Transplant center expertise improves survival after heart transplant (HTx) but it is unknown whether center expertise ameliorates risk associated with mechanical circulatory support (MCS) bridge to transplantation. This study investigated whether center HTx volume reduced survival disparities among pediatric HTx patients bridged with extracorporeal membrane oxygenation (ECMO), left ventricular assist device (LVAD), or no MCS. Patients ≤18 years of age receiving first-time HTx between 2005 and 2015 were identified in the United Network of Organ Sharing registry. Center volume was the total number of HTx during the study period, classified into tertiles. The primary outcome was 1 year post-transplant survival, and MCS type was interacted with center volume in Cox proportional hazards regression. The study cohort included 4131 patients, of whom 719 were supported with LVAD and 230 with ECMO. In small centers (≤133 HTx over study period), patients bridged with ECMO had increased post-transplant mortality hazard compared to patients bridged with LVAD (HR 0.29, 95% CI 0.12, 0.71; p = 0.006) and patients with no MCS (HR 0.33, 95% CI 0.19, 0.57; p < 0.001). Interactions of MCS type with medium or large center volume were not statistically significant, and the same differences in survival by MCS type were observed in medium- or large-volume centers (136-208 or ≥214 HTx over the study period). Post-HTx survival disadvantage of pediatric patients bridged with ECMO persisted regardless of transplant program volume. The role of institutional ECMO expertise outside the transplant setting for improving outcomes of ECMO bridge to HTx should be explored.

  11. How Did the Spider Cross the River? Behavioral Adaptations for River-Bridging Webs in Caerostris darwini (Araneae: Araneidae)

    PubMed Central

    Gregorič, Matjaž; Agnarsson, Ingi; Blackledge, Todd A.; Kuntner, Matjaž

    2011-01-01

    Background Interspecific coevolution is well described, but we know significantly less about how multiple traits coevolve within a species, particularly between behavioral traits and biomechanical properties of animals' “extended phenotypes”. In orb weaving spiders, coevolution of spider behavior with ecological and physical traits of their webs is expected. Darwin's bark spider (Caerostris darwini) bridges large water bodies, building the largest known orb webs utilizing the toughest known silk. Here, we examine C. darwini web building behaviors to establish how bridge lines are formed over water. We also test the prediction that this spider's unique web ecology and architecture coevolved with new web building behaviors. Methodology We observed C. darwini in its natural habitat and filmed web building. We observed 90 web building events, and compared web building behaviors to other species of orb web spiders. Conclusions Caerostris darwini uses a unique set of behaviors, some unknown in other spiders, to construct its enormous webs. First, the spiders release unusually large amounts of bridging silk into the air, which is then carried downwind, across the water body, establishing bridge lines. Second, the spiders perform almost no web site exploration. Third, they construct the orb capture area below the initial bridge line. In contrast to all known orb-weavers, the web hub is therefore not part of the initial bridge line but is instead built de novo. Fourth, the orb contains two types of radial threads, with those in the upper half of the web doubled. These unique behaviors result in a giant, yet rather simplified web. Our results continue to build evidence for the coevolution of behavioral (web building), ecological (web microhabitat) and biomaterial (silk biomechanics) traits that combined allow C. darwini to occupy a unique niche among spiders. PMID:22046378

  12. Ceremony celebrates 50 years of rocket launches

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Ceremony celebrates 50 years of rocket launches PL00C-10364.21 At the 50th anniversary ceremony celebrating the first rocket launch from pad 3 on what is now Cape Canaveral Air Force Station, KSC's Center Director Roy Bridges Jr. addresses an audience that included members of the team who successfully launched the first rocket, known as Bumper 8. The original launch occurred July 24, 1950. The anniversary ceremony was hosted by the Air Force Space & Missile Museum Foundation, Inc., and included launch of a Bumper 8 model rocket, presentation of a Bumper Award to Florida Sen. George Kirkpatrick by the National Space Club; plus remarks by Sen. Kirkpatrick, Bridges, and the Commander of the 45th Space Wing, Brig. Gen. Donald Pettit. A reception followed at Hangar C. Since 1950 there have been a total of 3,245 launches from Cape Canaveral.

  13. Bridging the Silos of Service Delivery for High-Need, High-Cost Individuals.

    PubMed

    Sherry, Melissa; Wolff, Jennifer L; Ballreich, Jeromie; DuGoff, Eva; Davis, Karen; Anderson, Gerard

    2016-12-01

    Health care reform efforts that emphasize value have increased awareness of the importance of nonmedical factors in achieving better care, better health, and lower costs in the care of high-need, high-cost individuals. Programs that care for socioeconomically disadvantaged, high-need, high-cost individuals have achieved promising results in part by bridging traditional service delivery silos. This study examined 5 innovative community-oriented programs that are successfully coordinating medical and nonmedical services to identify factors that stimulate and sustain community-level collaboration and coordinated care across silos of health care, public health, and social services delivery. The authors constructed a conceptual framework depicting community health systems that highlights 4 foundational factors that facilitate community-oriented collaboration: flexible financing, shared leadership, shared data, and a strong shared vision of commitment toward delivery of person-centered care.

  14. Bridging the Higher Education Divide: Strengthening Community Colleges and Restoring the American Dream. The Report of The Century Foundation Task Force on Preventing Community Colleges from Becoming Separate and Unequal

    ERIC Educational Resources Information Center

    Century Foundation, 2013

    2013-01-01

    American community colleges stand at the confluence of four mighty rivers that are profoundly influencing all of American life. At a time of growing economic globalization, community colleges are a critical element in the strategy to address the skills and education gap to meet the emerging needs of industries in the new knowledge economy. In…

  15. The DataBridge: A System For Optimizing The Use Of Dark Data From The Long Tail Of Science

    NASA Astrophysics Data System (ADS)

    Lander, H.; Rajasekar, A.

    2015-12-01

    The DataBridge is a National Science Foundation funded collaborative project (OCI-1247652, OCI-1247602, OCI-1247663) designed to assist in the discovery of dark data sets from the long tail of science. The DataBridge aims to to build queryable communities of datasets using sociometric network analysis. This approach is being tested to evaluate the ability to leverage various forms of metadata to facilitate discovery of new knowledge. Each dataset in the Databridge has an associated name space used as a first level partitioning. In addition to testing known algorithms for SNA community building, the DataBridge project has built a message-based platform that allows users to provide their own algorithms for each of the stages in the community building process. The stages are: Signature Generation (SG): An SG algorithm creates a metadata signature for a dataset. Signature algorithms might use text metadata provided by the dataset creator or derive metadata. Relevance Algorithm (RA): An RA compares a pair of datasets and produces a similarity value between 0 and 1 for the two datasets. Sociometric Network Analysis (SNA): The SNA will operate on a similarity matrix produced by an RA to partition all of the datasets in the name space into a set of clusters. These clusters represent communities of closely related datasets. The DataBridge also includes a web application that produces a visual representation of the clustering. Future work includes a more complete application that will allow different types of searching of the network of datasets. The DataBridge approach is relevant to geoscience research and informatics. In this presentation we will outline the project, illustrate the deployment of the approach, and discuss other potential applications and next steps for the research such as applying this approach to models. In addition we will explore the relevance of DataBridge to other geoscience projects such as various EarthCube Building Blocks and DIBBS projects.

  16. Creep and shrinkage effects on integral abutment bridges

    NASA Astrophysics Data System (ADS)

    Munuswamy, Sivakumar

    Integral abutment bridges provide bridge engineers an economical design alternative to traditional bridges with expansion joints owing to the benefits, arising from elimination of expensive joints installation and reduced maintenance cost. The superstructure for integral abutment bridges is cast integrally with abutments. Time-dependent effects of creep, shrinkage of concrete, relaxation of prestressing steel, temperature gradient, restraints provided by abutment foundation and backfill and statical indeterminacy of the structure introduce time-dependent variations in the redundant forces. An analytical model and numerical procedure to predict instantaneous linear behavior and non-linear time dependent long-term behavior of continuous composite superstructure are developed in which the redundant forces in the integral abutment bridges are derived considering the time-dependent effects. The redistributions of moments due to time-dependent effects have been considered in the analysis. The analysis includes nonlinearity due to cracking of the concrete, as well as the time-dependent deformations. American Concrete Institute (ACI) and American Association of State Highway and Transportation Officials (AASHTO) models for creep and shrinkage are considered in modeling the time dependent material behavior. The variations in the material property of the cross-section corresponding to the constituent materials are incorporated and age-adjusted effective modulus method with relaxation procedure is followed to include the creep behavior of concrete. The partial restraint provided by the abutment-pile-soil system is modeled using discrete spring stiffness as translational and rotational degrees of freedom. Numerical simulation of the behavior is carried out on continuous composite integral abutment bridges and the deformations and stresses due to time-dependent effects due to typical sustained loads are computed. The results from the analytical model are compared with the published laboratory experimental and field data. The behavior of the laterally loaded piles supporting the integral abutments is evaluated and presented in terms of the lateral deflection, bending moment, shear force and stress along the pile depth.

  17. Centrifuge modeling of rocking-isolated inelastic RC bridge piers

    PubMed Central

    Loli, Marianna; Knappett, Jonathan A; Brown, Michael J; Anastasopoulos, Ioannis; Gazetas, George

    2014-01-01

    Experimental proof is provided of an unconventional seismic design concept, which is based on deliberately underdesigning shallow foundations to promote intense rocking oscillations and thereby to dramatically improve the seismic resilience of structures. Termed rocking isolation, this new seismic design philosophy is investigated through a series of dynamic centrifuge experiments on properly scaled models of a modern reinforced concrete (RC) bridge pier. The experimental method reproduces the nonlinear and inelastic response of both the soil-footing interface and the structure. To this end, a novel scale model RC (1:50 scale) that simulates reasonably well the elastic response and the failure of prototype RC elements is utilized, along with realistic representation of the soil behavior in a geotechnical centrifuge. A variety of seismic ground motions are considered as excitations. They result in consistent demonstrably beneficial performance of the rocking-isolated pier in comparison with the one designed conventionally. Seismic demand is reduced in terms of both inertial load and deck drift. Furthermore, foundation uplifting has a self-centering potential, whereas soil yielding is shown to provide a particularly effective energy dissipation mechanism, exhibiting significant resistance to cumulative damage. Thanks to such mechanisms, the rocking pier survived, with no signs of structural distress, a deleterious sequence of seismic motions that caused collapse of the conventionally designed pier. © 2014 The Authors Earthquake Engineering & Structural Dynamics Published by John Wiley & Sons Ltd. PMID:26300573

  18. Centrifuge modeling of rocking-isolated inelastic RC bridge piers.

    PubMed

    Loli, Marianna; Knappett, Jonathan A; Brown, Michael J; Anastasopoulos, Ioannis; Gazetas, George

    2014-12-01

    Experimental proof is provided of an unconventional seismic design concept, which is based on deliberately underdesigning shallow foundations to promote intense rocking oscillations and thereby to dramatically improve the seismic resilience of structures. Termed rocking isolation , this new seismic design philosophy is investigated through a series of dynamic centrifuge experiments on properly scaled models of a modern reinforced concrete (RC) bridge pier. The experimental method reproduces the nonlinear and inelastic response of both the soil-footing interface and the structure. To this end, a novel scale model RC (1:50 scale) that simulates reasonably well the elastic response and the failure of prototype RC elements is utilized, along with realistic representation of the soil behavior in a geotechnical centrifuge. A variety of seismic ground motions are considered as excitations. They result in consistent demonstrably beneficial performance of the rocking-isolated pier in comparison with the one designed conventionally. Seismic demand is reduced in terms of both inertial load and deck drift. Furthermore, foundation uplifting has a self-centering potential, whereas soil yielding is shown to provide a particularly effective energy dissipation mechanism, exhibiting significant resistance to cumulative damage. Thanks to such mechanisms, the rocking pier survived, with no signs of structural distress, a deleterious sequence of seismic motions that caused collapse of the conventionally designed pier. © 2014 The Authors Published by John Wiley & Sons Ltd.

  19. A Bridge Too Far: Suppressing Frost Using an Out-of-Plane Dry Zone

    NASA Astrophysics Data System (ADS)

    Spohn, Corey; Ahmadi, Farzad; Nath, Saurabh; Boreyko, Jonathan

    2017-11-01

    It has recently been shown that ice can suppress the formation of any nearby condensation or frost on a substrate. However, these in-plane dry zones require the hygroscopic ice features to be placed on the same surface they are helping to keep dry, which makes it impossible to achieve complete anti-frosting. Here, we create an out-of-plane dry zone by holding two aluminum surfaces parallel to each other, where a uniform sheet of frost was grown on one surface to keep the other surface completely dry. The critical separation required to keep the test surface dry was found to be a function of the ambient supersaturation. We also show that inter-droplet ice bridging, now known to be a primary mechanism for in-plane frost growth, can be similarly extended to an out-of-plane configuration. We freeze a droplet on a hydrophobic surface and suspend a water droplet above it, such that an ice bridge grows toward the water droplet. More generally, these findings show that the recently discovered phenomena of dry zones and ice bridging can be extended to out-of-plane scenarios, which could lead to a better understanding of the behavior of mixed-phase systems. This work was supported by the National Science Foundation (CBET-1604272) and by the 3M Company (Non-Tenured Faculty Award).

  20. Knowledge Discovery from Relations

    ERIC Educational Resources Information Center

    Guo, Zhen

    2010-01-01

    A basic and classical assumption in the machine learning research area is "randomness assumption" (also known as i.i.d assumption), which states that data are assumed to be independent and identically generated by some known or unknown distribution. This assumption, which is the foundation of most existing approaches in the literature, simplifies…

  1. Vygotsky's Legacy: A Foundation for Research and Practice

    ERIC Educational Resources Information Center

    Gredler, Margaret E.; Shields, Carolyn Claytor

    2007-01-01

    Most educators are familiar with Lev Vygotsky's concept of the "zone of proximal development," yet the bulk of Vygotsky's pioneering theory of cognitive development largely remains unknown. This volume provides a systematic, authoritative overview of Vygotsky's work and its implications for educational research and practice. Major topics include…

  2. Report: Vapor Intrusion Health Risks at Bannister Federal Complex Not a Concern for Buildings 50 and 52, Unknown for Other Buildings

    EPA Pesticide Factsheets

    Report #11-P-0048, January 5, 2011. Testing at Bannister Federal Complex in February 2010 revealed elevated levels of volatile organic compounds (VOCs) in the soil vapor beneath the foundations of buildings 50 and 52.

  3. Stem parasitic plant Cuscuta australis (dodder) transfers herbivory-induced signals among plants.

    PubMed

    Hettenhausen, Christian; Li, Juan; Zhuang, Huifu; Sun, Huanhuan; Xu, Yuxing; Qi, Jinfeng; Zhang, Jingxiong; Lei, Yunting; Qin, Yan; Sun, Guiling; Wang, Lei; Baldwin, Ian T; Wu, Jianqiang

    2017-08-08

    Cuscuta spp. (i.e., dodders) are stem parasites that naturally graft to their host plants to extract water and nutrients; multiple adjacent hosts are often parasitized by one or more Cuscuta plants simultaneously, forming connected plant clusters. Metabolites, proteins, and mRNAs are known to be transferred from hosts to Cuscuta , and Cuscuta bridges even facilitate host-to-host virus movement. Whether Cuscuta bridges transmit ecologically meaningful signals remains unknown. Here we show that, when host plants are connected by Cuscuta bridges, systemic herbivory signals are transmitted from attacked plants to unattacked plants, as revealed by the large transcriptomic changes in the attacked local leaves, undamaged systemic leaves of the attacked plants, and leaves of unattacked but connected hosts. The interplant signaling is largely dependent on the jasmonic acid pathway of the damaged local plants, and can be found among conspecific or heterospecific hosts of different families. Importantly, herbivore attack of one host plant elevates defensive metabolites in the other systemic Cuscuta bridge-connected hosts, resulting in enhanced resistance against insects even in several consecutively Cuscuta -connected host plants over long distances (> 100 cm). By facilitating plant-to-plant signaling, Cuscuta provides an information-based means of countering the resource-based fitness costs to their hosts.

  4. Stem parasitic plant Cuscuta australis (dodder) transfers herbivory-induced signals among plants

    PubMed Central

    Hettenhausen, Christian; Li, Juan; Zhuang, Huifu; Sun, Huanhuan; Xu, Yuxing; Qi, Jinfeng; Zhang, Jingxiong; Lei, Yunting; Qin, Yan; Sun, Guiling; Wang, Lei; Baldwin, Ian T.

    2017-01-01

    Cuscuta spp. (i.e., dodders) are stem parasites that naturally graft to their host plants to extract water and nutrients; multiple adjacent hosts are often parasitized by one or more Cuscuta plants simultaneously, forming connected plant clusters. Metabolites, proteins, and mRNAs are known to be transferred from hosts to Cuscuta, and Cuscuta bridges even facilitate host-to-host virus movement. Whether Cuscuta bridges transmit ecologically meaningful signals remains unknown. Here we show that, when host plants are connected by Cuscuta bridges, systemic herbivory signals are transmitted from attacked plants to unattacked plants, as revealed by the large transcriptomic changes in the attacked local leaves, undamaged systemic leaves of the attacked plants, and leaves of unattacked but connected hosts. The interplant signaling is largely dependent on the jasmonic acid pathway of the damaged local plants, and can be found among conspecific or heterospecific hosts of different families. Importantly, herbivore attack of one host plant elevates defensive metabolites in the other systemic Cuscuta bridge-connected hosts, resulting in enhanced resistance against insects even in several consecutively Cuscuta-connected host plants over long distances (> 100 cm). By facilitating plant-to-plant signaling, Cuscuta provides an information-based means of countering the resource-based fitness costs to their hosts. PMID:28739895

  5. Investigation on Plasma Jet Flow Phenomena During DC Air Arc Motion in Bridge-Type Contacts

    NASA Astrophysics Data System (ADS)

    Zhai, Guofu; Bo, Kai; Chen, Mo; Zhou, Xue; Qiao, Xinlei

    2016-05-01

    Arc plasma jet flow in the air was investigated under a bridge-type contacts in a DC 270 V resistive circuit. We characterized the arc plasma jet flow appearance at different currents by using high-speed photography, and two polished contacts were used to search for the relationship between roughness and plasma jet flow. Then, to make the nature of arc plasma jet flow phenomena clear, a simplified model based on magnetohydrodynamic (MHD) theory was established and calculated. The simulated DC arc plasma was presented with the temperature distribution and the current density distribution. Furthermore, the calculated arc flow velocity field showed that the circular vortex was an embodiment of the arc plasma jet flow progress. The combined action of volume force and contact surface was the main reason of the arc jet flow. supported by National Natural Science Foundation of China (Nos. 51307030, 51277038)

  6. Seismic impact of the railway on the geotechnical constructions

    NASA Astrophysics Data System (ADS)

    Stolárik, Martin; Pinka, Miroslav

    2017-09-01

    Nowadays, the focus on more ecological means of material and persons transport is still higher. Big loads can be transported on railways more effectively and with lower environment impact than on roads. The geotechnical structures are inherent parts of railway infrastructure, such as embankments, sides of notches and, of course, tunnels, foundation constructions of buildings or pillars of bridges and the others geotechnical constructions (e.g. retaining walls, culverts, transition area of bridges). By train pass, vibrations are caused and these vibrations are relayed to the soil. These vibrations can make adverse impact to surrounding objects and to technologies placed in. This so far uncared-for influence gets into the foreground by current trend of everyday life technical equipment increasing. The article introduces different kinds of geotechnical structures and the influence of by-passing railway transport on their constructions and surroundings. The data are evaluated in the amplitude and frequency domain.

  7. An Opportunity to Bridge the Gap Between Clinical Research and Clinical Practice: Implications for Clinical Training

    PubMed Central

    Hershenberg, Rachel; Drabick, Deborah A. G.; Vivian, Dina

    2013-01-01

    Clinical researchers and clinical practitioners share a goal of increasing the integration of research and clinical practice, which is reflected in an evidence-based practice (EBP) approach to psychology. The EBP framework involves the integration of research findings with clinical expertise and client characteristics, values, and preferences, and consequently provides an important foundation for conducting clinically relevant research, as well as empirically based and clinically sensitive practice. Given the critical role that early training can play in the integration of science and practice and in promoting the future of the field, the present article addresses predoctoral training programs as a context for adopting an EBP approach to clinical work. We address training in the three components of EBP and provide suggestions for curriculum development and practicum training that we hope will contribute to bridging the gap between research and practice. PMID:22642520

  8. A roadmap for bridging basic and applied research in forensic entomology.

    PubMed

    Tomberlin, J K; Mohr, R; Benbow, M E; Tarone, A M; VanLaerhoven, S

    2011-01-01

    The National Research Council issued a report in 2009 that heavily criticized the forensic sciences. The report made several recommendations that if addressed would allow the forensic sciences to develop a stronger scientific foundation. We suggest a roadmap for decomposition ecology and forensic entomology hinging on a framework built on basic research concepts in ecology, evolution, and genetics. Unifying both basic and applied research fields under a common umbrella of terminology and structure would facilitate communication in the field and the production of scientific results. It would also help to identify novel research areas leading to a better understanding of principal underpinnings governing ecosystem structure, function, and evolution while increasing the accuracy of and ability to interpret entomological evidence collected from crime scenes. By following the proposed roadmap, a bridge can be built between basic and applied decomposition ecology research, culminating in science that could withstand the rigors of emerging legal and cultural expectations.

  9. Membrane-Soil Composite Layers in the Design, Construction, and Performance of an Expedient Bridge and Approach.

    DTIC Science & Technology

    1982-09-01

    Engineering News-Record 1977). The concept is that of a composite soil-membrane system with tensile and flexural strengths greater than soil alone can...uniformity 2 Mean diameter 0.5 mm Sandbags 31. Sandbags used in this project were 14 x 26 in. in size and were made of jute or kenaf burlap...support 4. Converted airfield index penetrometer readings for the upper 6 in. of foundation soil indicated similar relative strengths at the base of

  10. Repair, Evaluation, Maintenance, and Rehabilitation Research Program. Underwater Repair of Concrete Damaged by Abrasion-Erosion

    DTIC Science & Technology

    1991-12-01

    and compatible placement tech- niques that can ensure successful and cost effective repairs of scour holes of different sizes and depths under water...bridge foundation in Japan. The valve was attached to the bottom of a pump line and was moved to cast concrete in successive layers at several locations...surfaces, reinforc- ing steel, and dowel bars in order to ensure successful and durable repairs. Thi. is ( specizlly important since it is not practical to

  11. Application of fiber bridging models to fatigue crack growth in unidirectional titanium matrix composites

    NASA Technical Reports Server (NTRS)

    Bakuckas, J. G., Jr.; Johnson, W. S.

    1992-01-01

    Several fiber bridging models were reviewed and applied to study the matrix fatigue crack growth behavior in center notched (0)(sub 8) SCS-6/Ti-15-3 and (0)(sub 4) SCS-6/Ti-6Al-4V laminates. Observations revealed that fatigue damage consisted primarily of matrix cracks and fiber matrix interfacial failure in the (0)(sub 8) SCS-6/Ti-15-3 laminates. Fiber-matrix interface failure included fracture of the brittle reaction zone and cracking between the two carbon rich fiber coatings. Intact fibers in the wake of the matrix cracks reduce the stress intensity factor range. Thus, an applied stress intensity factor range is inappropriate to characterize matrix crack growth behavior. Fiber bridging models were used to determine the matrix stress intensity factor range in titanium metal matrix composites. In these models, the fibers in the wake of the crack are idealized as a closure pressure. An unknown constant frictional shear stress is assumed to act along the debond or slip length of the bridging fibers. The frictional shear stress was used as a curve fitting parameter to available data (crack growth data, crack opening displacement data, and debond length data). Large variations in the frictional shear stress required to fit the experimental data indicate that the fiber bridging models in their present form lack predictive capabilities. However, these models provide an efficient and relatively simple engineering method for conducting parametric studies of the matrix growth behavior based on constituent properties.

  12. StpA and Hha stimulate pausing by RNA polymerase by promoting DNA-DNA bridging of H-NS filaments.

    PubMed

    Boudreau, Beth A; Hron, Daniel R; Qin, Liang; van der Valk, Ramon A; Kotlajich, Matthew V; Dame, Remus T; Landick, Robert

    2018-06-20

    In enterobacteria, AT-rich horizontally acquired genes, including virulence genes, are silenced through the actions of at least three nucleoid-associated proteins (NAPs): H-NS, StpA and Hha. These proteins form gene-silencing nucleoprotein filaments through direct DNA binding by H-NS and StpA homodimers or heterodimers. Both linear and bridged filaments, in which NAPs bind one or two DNA segments, respectively, have been observed. Hha can interact with H-NS or StpA filaments, but itself lacks a DNA-binding domain. Filaments composed of H-NS alone can inhibit transcription initiation and, in the bridged conformation, slow elongating RNA polymerase (RNAP) by promoting backtracking at pause sites. How the other NAPs modulate these effects of H-NS is unknown, despite evidence that they help regulate subsets of silenced genes in vivo (e.g. in pathogenicity islands). Here we report that Hha and StpA greatly enhance H-NS-stimulated pausing by RNAP at 20°C. StpA:H-NS or StpA-only filaments also stimulate pausing at 37°C, a temperature at which Hha:H-NS or H-NS-only filaments have much less effect. In addition, we report that both Hha and StpA greatly stimulate DNA-DNA bridging by H-NS filaments. Together, these observations indicate that Hha and StpA can affect H-NS-mediated gene regulation by stimulating bridging of H-NS/DNA filaments.

  13. Identification of unusual events in multichannel bridge monitoring data using wavelet transform and outlier analysis

    NASA Astrophysics Data System (ADS)

    Omenzetter, Piotr; Brownjohn, James M. W.; Moyo, Pilate

    2003-08-01

    Continuously operating instrumented structural health monitoring (SHM) systems are becoming a practical alternative to replace visual inspection for assessment of condition and soundness of civil infrastructure. However, converting large amount of data from an SHM system into usable information is a great challenge to which special signal processing techniques must be applied. This study is devoted to identification of abrupt, anomalous and potentially onerous events in the time histories of static, hourly sampled strains recorded by a multi-sensor SHM system installed in a major bridge structure in Singapore and operating continuously for a long time. Such events may result, among other causes, from sudden settlement of foundation, ground movement, excessive traffic load or failure of post-tensioning cables. A method of outlier detection in multivariate data has been applied to the problem of finding and localizing sudden events in the strain data. For sharp discrimination of abrupt strain changes from slowly varying ones wavelet transform has been used. The proposed method has been successfully tested using known events recorded during construction of the bridge, and later effectively used for detection of anomalous post-construction events.

  14. Nontargeted diagnostic ion network analysis (NINA): A software to streamline the analytical workflow for untargeted characterization of natural medicines.

    PubMed

    Ye, Hui; Zhu, Lin; Sun, Di; Luo, Xiaozhuo; Lu, Gaoyuan; Wang, Hong; Wang, Jing; Cao, Guoxiu; Xiao, Wei; Wang, Zhenzhong; Wang, Guangji; Hao, Haiping

    2016-11-30

    The characterization of herbal prescriptions serves as a foundation for quality control and regulation of herbal medicines. Previously, the characterization of herbal chemicals from natural medicines often relied on the analysis of signature fragment ions from the acquired tandem mass spectrometry (MS/MS) spectra with prior knowledge of the herbal species present in the herbal prescriptions of interest. Nevertheless, such an approach is often limited to target components, and it risks missing the critical components that we have no prior knowledge of. We previously reported a "diagnostic ion-guided network bridging" strategy. It is a generally applicable and robust approach to analyze unknown substances from complex mixtures in an untargeted manner. In this study, we have developed a standalone software named "Nontargeted Diagnostic Ion Network Analysis (NINA)" with a graphical user interface based on a strategy for post-acquisition data analysis. NINA allows one to rapidly determine the nontargeted diagnostic ions (NIs) by summarizing all of the fragment ions shared by the precursors from the acquired MS/MS spectra. A NI-guided network using bridging components that possess two or more NIs can then be established via NINA. With such a network, we could sequentially identify the structures of all the NIs once a single compound has been identified de novo. The structures of NIs can then be used as "priori" knowledge to narrow the candidates containing the sub-structure of the corresponding NI from the database hits. Subsequently, we applied the NINA software to the characterization of a model herbal prescription, Re-Du-Ning injection, and rapidly identified 56 herbal chemicals from the prescription using an ultra-performance liquid chromatography quadrupole time-of-flight system in the negative mode with no knowledge of the herbal species or herbal chemicals in the mixture. Therefore, we believe the applications of NINA will greatly facilitate the characterization of complex mixtures, such as natural medicines, especially when no advance information is available. In addition to herbal medicines, the NINA-based workflow will also benefit many other fields, such as environmental analysis, nutritional science, and forensic analysis. Copyright © 2016 Elsevier B.V. All rights reserved.

  15. Investigation of the foundations of a Byzantine church by three-dimensional seismic tomography

    NASA Astrophysics Data System (ADS)

    Polymenakos, L.; Papamarinopoulos, S.; Miltiadou, A.; Charkiolakis, N.

    2005-02-01

    Byzantine public buildings are of high historical and cultural value. Churches, in particular, are of high architectural and artistic value because they are built using various materials and construction techniques and may contain significant frescoes and mosaics. The knowledge of the state of foundations and ground material conditions is important for their proper restoration and preservation. Seismic tomography is employed to investigate the foundation structure and ground material of a Byzantine church. Energy sources are placed across the floor of the church and surrounding courts, while recorders are placed in a subterranean crypt. Travel time data are analyzed and processed with a three-dimensional (3D) tomographic inversion software in order to construct seismic velocity images at the foundation and below foundation level. Velocity variations are known to correlate well with the lithological character of the earth materials, thus providing important structural and lithological information. A case study from a Byzantine church of 11th c. A.D. in the suburbs of Athens, Greece, is presented. The objective of this research is the nondestructive investigation of unknown underground structures or void spaces, mainly under the floor of the building. The results are interpreted in terms of the foundation elements as well as of significant variations in the earth material character.

  16. Effect of temperature on residual force enhancement in single skeletal muscle fibers.

    PubMed

    Lee, Eun-Jeong; Herzog, Walter

    2008-08-28

    It is well accepted that the steady-state isometric force following active stretching of a muscle is greater than the steady-state isometric force obtained in a purely isometric contraction at the same length. This property of skeletal muscle has been called residual force enhancement (FE). Despite decades of research the mechanisms responsible for FE have remained largely unknown. Based on previous studies showing increases in FE in fibers in which cross-bridges were biased towards weakly bound states, we hypothesized that FE might be associated with a stretch-induced facilitation of transitioning from weakly to strongly bound cross-bridges. In order to test this hypothesis, single fibers (n=11) from the lumbrical muscles of frog (Rana pipiens) were used to determine FE at temperatures of 7 and 20 degrees C. At the cold temperature, cross-bridges are biased towards weakly bound states, therefore we expected FE to be greater at 7 degrees C compared to 20 degrees C. The average FE was significantly greater at 7 degrees C (11.5+/-1.1%) than at 20 degrees C (7.8+/-1.0%), as expected. The enhancement of force/stiffness was also significantly greater at the low (13.3+/-1.4%) compared to the high temperature (5.6+/-1.7%), indicating an increased conversion from weakly to strongly bound cross-bridges at the low temperature. We conclude from the results of this study that muscle preparations that are biased towards weakly bound cross-bridge states show increased FE for given stretch conditions, thereby supporting the idea that FE might be caused, in part, by a stretch-induced facilitation of the conversion of weakly to strongly bound cross-bridges.

  17. How useful is determination of anti-factor Xa activity to guide bridging therapy with enoxaparin? A pilot study.

    PubMed

    Hammerstingl, Christoph; Omran, Heyder; Tripp, Christian; Poetzsch, Bernd

    2009-02-01

    Low-molecular-weight heparins (LMWH) are commonly used as peri-procedural bridging anticoagulants. The usefulness of measurement of anti-factor Xa activity (anti-Xa) to guide bridging therapy with LMWH is unknown. It was the objective of this study to determine levels of anti-Xa during standard bridging therapy with enoxaparin, and to examine predictors for residual anti-Xa. Consecutive patients receiving enoxaparin at a dosage of 1 mg/kg body weight/12 hours for temporary interruption of phenprocoumon were prospectively enrolled to the study. Blood-samples were obtained 14 hours after LMWH-application immediately pre- procedurally. Procedural details, clinical and demographic data were collected and subsequently analyzed. Seventy patients were included (age 75.2 +/- 10.8 years, Cr Cl 55.7 +/- 21.7ml/min, body mass index [BMI] 27.1 +/- 4.9). LMWH- therapy was for a mean of 4.2 +/- 1.6 days; overall anti-Xa was 0.58 +/- 0.32 U/ml. In 37 (52.8%) of patients anti-Xa was > or U/ml, including 10 (14.3%) patients with anti-Xa > 1U/ml. Linear regression analysis of single variables and logistic multivariable regression analysis failed to prove a correlation between anti-Xa and single or combined factors. No major bleeding, no thromboembolism and four (5.7%) minor haemorrhages were observed. When bridging OAC with therapeutic doses of enoxaparin a high percentage of patients undergo interventions with high residual anti-Xa. The levels of anti-Xa vary largely and are independent of single or combined clinical variables. Since the anti-Xa-related outcome of patients receiving bridging therapy with LMWH is not investigated, no firm recommendation on the usefulness of monitoring of anti-Xa can be given at this stage.

  18. Two-Electron Transfer Pathways.

    PubMed

    Lin, Jiaxing; Balamurugan, D; Zhang, Peng; Skourtis, Spiros S; Beratan, David N

    2015-06-18

    The frontiers of electron-transfer chemistry demand that we develop theoretical frameworks to describe the delivery of multiple electrons, atoms, and ions in molecular systems. When electrons move over long distances through high barriers, where the probability for thermal population of oxidized or reduced bridge-localized states is very small, the electrons will tunnel from the donor (D) to acceptor (A), facilitated by bridge-mediated superexchange interactions. If the stable donor and acceptor redox states on D and A differ by two electrons, it is possible that the electrons will propagate coherently from D to A. While structure-function relations for single-electron superexchange in molecules are well established, strategies to manipulate the coherent flow of multiple electrons are largely unknown. In contrast to one-electron superexchange, two-electron superexchange involves both one- and two-electron virtual intermediate states, the number of virtual intermediates increases very rapidly with system size, and multiple classes of pathways interfere with one another. In the study described here, we developed simple superexchange models for two-electron transfer. We explored how the bridge structure and energetics influence multielectron superexchange, and we compared two-electron superexchange interactions to single-electron superexchange. Multielectron superexchange introduces interference between singly and doubly oxidized (or reduced) bridge virtual states, so that even simple linear donor-bridge-acceptor systems have pathway topologies that resemble those seen for one-electron superexchange through bridges with multiple parallel pathways. The simple model systems studied here exhibit a richness that is amenable to experimental exploration by manipulating the multiple pathways, pathway crosstalk, and changes in the number of donor and acceptor species. The features that emerge from these studies may assist in developing new strategies to deliver multiple electrons in condensed-phase redox systems, including multiple-electron redox species, multimetallic/multielectron redox catalysts, and multiexciton excited states.

  19. Tsunesaburo Makiguchi and Mikhail Bakhtin in Dialogue: Pedagogy for a Spatial Literacy of Ecological Selfhood

    ERIC Educational Resources Information Center

    Goulah, Jason

    2009-01-01

    This article considers the philosophies of unknown Japanese educator Tsunesaburo Makiguchi (1871-1944) and his Russian contemporary Mikhail Bakhtin (1895-1975) as an Asian-Pacific pedagogical foundation for addressing the fierce urgency of human-induced environmental destruction and global climate shock. Specifically, the author compares…

  20. α decay properties of 297Og within the two-potential approach

    NASA Astrophysics Data System (ADS)

    Deng, Jun-Gang; Cheng, Jun-Hao; Zheng, Bo; Li, Xiao-Hua

    2017-12-01

    The α decay half-life of the unknown nucleus 297Og is predicted within the two-potential approach, and α preformation probabilities of 64 odd-A nuclei in the region of proton numbers 82 < Z < 126 and neutron numbers 152 < N < 184, from 251Cf to 295Og, are extracted. In addition, based on the latest experimental data, a new set of parameters for α preformation probabilities considering the shell effect and proton-neutron interaction are obtained. The predicted α decay half-life of 297Og is 0.16 ms within a factor of 4.97. The predicted spin and parity of the ground states for 269Sg, 285Fl and 293Lv are 3/2+, 3/2+ and 5/2+, respectively. Supported by National Natural Science Foundation of China (11205083, 11505100), Construct Program of the Key Discipline in Hunan Province, the Research Foundation of Education Bureau of Hunan Province, China (15A159), the Natural Science Foundation of Hunan Province, China (2015JJ3103, 2015JJ2121), the Innovation Group of Nuclear and Particle Physics in USC, the Shandong Province Natural Science Foundation, China (ZR2015AQ007) and Hunan Provincial Innovation Foundation For Postgraduate (CX2017B536)

  1. Computational mechanics research and support for aerodynamics and hydraulics at TFHRC year 1 quarter 4 progress report.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lottes, S.A.; Kulak, R.F.; Bojanowski, C.

    2011-12-09

    The computational fluid dynamics (CFD) and computational structural mechanics (CSM) focus areas at Argonne's Transportation Research and Analysis Computing Center (TRACC) initiated a project to support and compliment the experimental programs at the Turner-Fairbank Highway Research Center (TFHRC) with high performance computing based analysis capabilities in August 2010. The project was established with a new interagency agreement between the Department of Energy and the Department of Transportation to provide collaborative research, development, and benchmarking of advanced three-dimensional computational mechanics analysis methods to the aerodynamics and hydraulics laboratories at TFHRC for a period of five years, beginning in October 2010. Themore » analysis methods employ well-benchmarked and supported commercial computational mechanics software. Computational mechanics encompasses the areas of Computational Fluid Dynamics (CFD), Computational Wind Engineering (CWE), Computational Structural Mechanics (CSM), and Computational Multiphysics Mechanics (CMM) applied in Fluid-Structure Interaction (FSI) problems. The major areas of focus of the project are wind and water effects on bridges - superstructure, deck, cables, and substructure (including soil), primarily during storms and flood events - and the risks that these loads pose to structural failure. For flood events at bridges, another major focus of the work is assessment of the risk to bridges caused by scour of stream and riverbed material away from the foundations of a bridge. Other areas of current research include modeling of flow through culverts to assess them for fish passage, modeling of the salt spray transport into bridge girders to address suitability of using weathering steel in bridges, CFD analysis of the operation of the wind tunnel in the TFCHR wind engineering laboratory, vehicle stability under high wind loading, and the use of electromagnetic shock absorbers to improve vehicle stability under high wind conditions. This quarterly report documents technical progress on the project tasks for the period of July through September 2011.« less

  2. Student Perceptions of a Flipped Pharmacotherapy Course

    PubMed Central

    Khanova, Julia; McLaughlin, Jacqueline E.; Rhoney, Denise H.; Roth, Mary T.

    2015-01-01

    Objective. To evaluate student perception of the flipped classroom redesign of a required pharmacotherapy course. Design. Key foundational content was packaged into interactive, text-based online modules for self-paced learning prior to class. Class time was used for active and applied—but primarily case-based—learning. Assessment. For students with a strong preference for traditional lecture learning, the perception of the learning experience was negatively affected by the flipped course design. Module length and time required to complete preclass preparation were the most frequently cited impediments to learning. Students desired instructor-directed reinforcement of independently acquired knowledge to connect foundational knowledge and its application. Conclusion. This study illustrates the challenges and highlights the importance of designing courses to effectively balance time requirements and connect preclass and in-class learning activities. It underscores the crucial role of the instructor in bridging the gap between material learned as independent study and its application. PMID:26839429

  3. Insights into the genetic foundations of human communication.

    PubMed

    Graham, Sarah A; Deriziotis, Pelagia; Fisher, Simon E

    2015-03-01

    The human capacity to acquire sophisticated language is unmatched in the animal kingdom. Despite the discontinuity in communicative abilities between humans and other primates, language is built on ancient genetic foundations, which are being illuminated by comparative genomics. The genetic architecture of the language faculty is also being uncovered by research into neurodevelopmental disorders that disrupt the normally effortless process of language acquisition. In this article, we discuss the strategies that researchers are using to reveal genetic factors contributing to communicative abilities, and review progress in identifying the relevant genes and genetic variants. The first gene directly implicated in a speech and language disorder was FOXP2. Using this gene as a case study, we illustrate how evidence from genetics, molecular cell biology, animal models and human neuroimaging has converged to build a picture of the role of FOXP2 in neurodevelopment, providing a framework for future endeavors to bridge the gaps between genes, brains and behavior.

  4. Technical - Economic Research for Passive Buildings

    NASA Astrophysics Data System (ADS)

    Miniotaite, Ruta

    2017-10-01

    A newly constructed passive house must save 80 % of heat resources; otherwise it is not a passive house. The heating energy demand of a passive building is less than 15 kWh/m2 per year. However, a passive house is something more than just an energy-saving house. This concept involves sustainable, high-quality, valuable, healthy and durable construction. Features of a passive house: high insulation of envelope components, high-quality windows, good tightness of the building, regenerative ventilation system and elimination of thermal bridges. The Energy Performance of Buildings Directive (EPBD) 61 requires all new public buildings to become near-zero energy buildings by 2019 and will be extended to all new buildings by 2021. This concept involves sustainable, high-quality, valuable, healthy and durable construction. Foundation, walls and roofs are the most essential elements of a house. The type of foundation for a private house is selected considering many factors. The article examines technological and structural solutions for passive buildings foundation, walls and roofs. The technical-economic comparison of the main structures of a passive house revealed that it is cheaper to install an adequately designed concrete slab foundation than to build strip or pile foundation and the floor separately. Timber stud walls are the cheapest wall option for a passive house and 45-51% cheaper compared to other options. The comparison of roofs and ceilings showed that insulation of the ceiling is 25% more efficient than insulation of the roof. The comparison of the main envelope elements efficiency by multiple-criteria evaluation methods showed that it is economically feasible to install concrete slab on ground foundation, stud walls with sheet cladding and a pitched roof with insulated ceiling.

  5. Numerical study of the stress-strain state of reinforced plate on an elastic foundation by the Bubnov-Galerkin method

    NASA Astrophysics Data System (ADS)

    Beskopylny, Alexey; Kadomtseva, Elena; Strelnikov, Grigory

    2017-10-01

    The stress-strain state of a rectangular slab resting on an elastic foundation is considered. The slab material is isotropic. The slab has stiffening ribs that directed parallel to both sides of the plate. Solving equations are obtained for determining the deflection for various mechanical and geometric characteristics of the stiffening ribs which are parallel to different sides of the plate, having different rigidity for bending and torsion. The calculation scheme assumes an orthotropic slab having different cylindrical stiffness in two mutually perpendicular directions parallel to the reinforcing ribs. An elastic foundation is adopted by Winkler model. To determine the deflection the Bubnov-Galerkin method is used. The deflection is taken in the form of an expansion in a series with unknown coefficients by special polynomials, which are a combination of Legendre polynomials.

  6. Photographic copy of July 30, 1934 black and white photograph. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of July 30, 1934 black and white photograph. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. 1934 PHOTOGRAPH OF PIER IV LOOKING NORTHWEST FROM BEST BANK TOWARD EAST BANK. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  7. 21. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    21. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1926. Vol. I, Narrative and Photographs, RG 75, Entry 655, Box 29, National Archives, Washington, DC.) Photographer unknown. SACATON DAM, UPSTREAM SIDE FROM SOUTH END, 8/29/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  8. Tin Whisker Electrical Short Circuit Characteristics Part 2

    NASA Technical Reports Server (NTRS)

    Courey, Karim J.; Asfour, Shihab S.; Bayliss, Jon A.; Ludwib, Lawrence L.; Zapata, Maria C.

    2007-01-01

    Existing risk simulations make the assumption that when a free tin whisker has bridged two adjacent exposed electrical conductors, the result is an electrical short circuit. This conservative assumption is made because shorting is a random event that has a currently unknown probability associated with it. Due to contact resistance electrical shorts may not occur at lower voltage levels. In this experiment, we study the effect of varying voltage on the breakdown of the contact resistance which leads to a short circuit. From this data we can estimate the probability of an electrical short, as a function of voltage, given that a free tin whisker has bridged two adjacent exposed electrical conductors. In addition, three tin whiskers grown from the same Space Shuttle Orbiter card guide used in the aforementioned experiment were cross-sectioned and studied using a focused ion beam (FIB).

  9. Performance-based seismic assessment of skewed bridges with and without considering soil-foundation interaction effects for various site classes

    NASA Astrophysics Data System (ADS)

    Ghotbi, Abdoul R.

    2014-09-01

    The seismic behavior of skewed bridges has not been well studied compared to straight bridges. Skewed bridges have shown extensive damage, especially due to deck rotation, shear keys failure, abutment unseating and column-bent drift. This research, therefore, aims to study the behavior of skewed and straight highway overpass bridges both with and without taking into account the effects of Soil-Structure Interaction (SSI) due to near-fault ground motions. Due to several sources of uncertainty associated with the ground motions, soil and structure, a probabilistic approach is needed. Thus, a probabilistic methodology similar to the one developed by the Pacific Earthquake Engineering Research Center (PEER) has been utilized to assess the probability of damage due to various levels of shaking using appropriate intensity measures with minimum dispersions. The probabilistic analyses were performed for various bridge configurations and site conditions, including sand ranging from loose to dense and clay ranging from soft to stiff, in order to evaluate the effects. The results proved a considerable susceptibility of skewed bridges to deck rotation and shear keys displacement. It was also found that SSI had a decreasing effect on the damage probability for various demands compared to the fixed-base model without including SSI. However, deck rotation for all types of the soil and also abutment unseating for very loose sand and soft clay showed an increase in damage probability compared to the fixed-base model. The damage probability for various demands has also been found to decrease with an increase of soil strength for both sandy and clayey sites. With respect to the variations in the skew angle, an increase in skew angle has had an increasing effect on the amplitude of the seismic response for various demands. Deck rotation has been very sensitive to the increase in the skew angle; therefore, as the skew angle increased, the deck rotation responded accordingly. Furthermore, abutment unseating showed an increasing trend due to an increase in skew angle for both fixed-base and SSI models.

  10. Finn Basks in Role as Standards-Bearer, Gadfly

    ERIC Educational Resources Information Center

    Maxwell, Lesli A.

    2006-01-01

    When Chester E. Finn Jr.--already one of Washington's best-known education policy entrepreneurs--took charge of an unknown foundation in Dayton, Ohio, in 1997, the match quickly blossomed into a fruitful marriage. Drawing on a nearly $50 million endowment in need of a mission, Mr. Finn, in the decade since, has shaped the Thomas B. Fordham…

  11. Leaping into the Unknown: Developing Thinking in the Primary Science Classroom

    ERIC Educational Resources Information Center

    Serret, Natasha

    2004-01-01

    The original project, the foundation for all subsequent work, was set up in 1981 by Michael Shayer, with Philip Adey and Carolyn Yates, and became known as CASE @ KS3 (Adey and Shayer, 1994). CASE stands for Cognitive Acceleration through Science Education. The original CASE project drew on Piaget's work on the stage theory of cognitive…

  12. Probabilistic Teleportation of an Arbitrary Three-Level Two-Particle State and Classical Communication Cost

    NASA Astrophysics Data System (ADS)

    Dai, Hong-Yi; Kuang, Le-Man; Li, Cheng-Zu

    2005-07-01

    We propose a scheme to probabilistically teleport an unknown arbitrary three-level two-particle state by using two partial entangled two-particle states of three-level as the quantum channel. The classical communication cost required in the ideal probabilistic teleportation process is also calculated. This scheme can be directly generalized to teleport an unknown and arbitrary three-level K-particle state by using K partial entangled two-particle states of three-level as the quantum channel. The project supported by National Fundamental Research Program of China under Grant No. 2001CB309310, National Natural Science Foundation of China under Grant Nos. 10404039 and 10325523

  13. Molecular dynamics simulations on the Tre1 G protein-coupled receptor: exploring the role of the arginine of the NRY motif in Tre1 structure

    PubMed Central

    2013-01-01

    Background The arginine of the D/E/NRY motif in Rhodopsin family G protein-coupled receptors (GPCRs) is conserved in 96% of these proteins. In some GPCRs, this arginine in transmembrane 3 can form a salt bridge with an aspartic acid or glutamic acid in transmembrane 6. The Drosophila melanogaster GPCR Trapped in endoderm-1 (Tre1) is required for normal primordial germ cell migration. In a mutant form of the protein, Tre1sctt, eight amino acids RYILIACH are missing, resulting in a severe disruption of primordial germ cell development. The impact of the loss of these amino acids on Tre1 structure is unknown. Since the missing amino acids in Tre1sctt include the arginine that is part of the D/E/NRY motif in Tre1, molecular dynamics simulations were performed to explore the hypothesis that these amino acids are involved in salt bridge formation and help maintain Tre1 structure. Results Structural predictions of wild type Tre1 (Tre1+) and Tre1sctt were subjected to over 250 ns of molecular dynamics simulations. The ability of the model systems to form a salt bridge between the arginine of the D/E/NRY motif and an aspartic acid residue in transmembrane 6 was analyzed. The results indicate that a stable salt bridge can form in the Tre1+ systems and a weak salt bridge or no salt bridge, using an alternative arginine, is likely in the Tre1sctt systems. Conclusions The weak salt bridge or lack of a salt bridge in the Tre1sctt systems could be one possible explanation for the disrupted function of Tre1sctt in primordial germ cell migration. These results provide a framework for studying the importance of the arginine of the D/E/NRY motif in the structure and function of other GPCRs that are involved in cell migration, such as CXCR4 in the mouse, zebrafish, and chicken. PMID:24044607

  14. Molecular dynamics simulations on the Tre1 G protein-coupled receptor: exploring the role of the arginine of the NRY motif in Tre1 structure.

    PubMed

    Pruitt, Margaret M; Lamm, Monica H; Coffman, Clark R

    2013-09-18

    The arginine of the D/E/NRY motif in Rhodopsin family G protein-coupled receptors (GPCRs) is conserved in 96% of these proteins. In some GPCRs, this arginine in transmembrane 3 can form a salt bridge with an aspartic acid or glutamic acid in transmembrane 6. The Drosophila melanogaster GPCR Trapped in endoderm-1 (Tre1) is required for normal primordial germ cell migration. In a mutant form of the protein, Tre1sctt, eight amino acids RYILIACH are missing, resulting in a severe disruption of primordial germ cell development. The impact of the loss of these amino acids on Tre1 structure is unknown. Since the missing amino acids in Tre1sctt include the arginine that is part of the D/E/NRY motif in Tre1, molecular dynamics simulations were performed to explore the hypothesis that these amino acids are involved in salt bridge formation and help maintain Tre1 structure. Structural predictions of wild type Tre1 (Tre1+) and Tre1sctt were subjected to over 250 ns of molecular dynamics simulations. The ability of the model systems to form a salt bridge between the arginine of the D/E/NRY motif and an aspartic acid residue in transmembrane 6 was analyzed. The results indicate that a stable salt bridge can form in the Tre1+ systems and a weak salt bridge or no salt bridge, using an alternative arginine, is likely in the Tre1sctt systems. The weak salt bridge or lack of a salt bridge in the Tre1sctt systems could be one possible explanation for the disrupted function of Tre1sctt in primordial germ cell migration. These results provide a framework for studying the importance of the arginine of the D/E/NRY motif in the structure and function of other GPCRs that are involved in cell migration, such as CXCR4 in the mouse, zebrafish, and chicken.

  15. Recombinant Expression, Functional Characterization of Two Scorpion Venom Toxins with Three Disulfide Bridges from the Chinese Scorpion Buthus martensii Karsch.

    PubMed

    Lin, Shengguo; Wang, Xuelin; Hu, Xueyao; Zhao, Yongshan; Zhao, Mingyi; Zhang, Jinghai; Cui, Yong

    2017-01-01

    Scorpion venom contains a large variety of biologically active peptides. However, most of these peptides have not been identified and characterized. Peptides with three disulfide bridges, existing in the scorpion venom, have not been studied in detail and have been poorly characterized until now. Here, we report the recombinant expression and functional characterization of two kinds of venom peptides (BmKBTx and BmNaL-3SS2) with three disulfide bridges. This study adopted an effective Escherichia coli system. The genes for BmKBTx and BmNaL-3SS2 were obtained by polymerase chain reaction and cloned to the pSYPU-1b vector. After expression and purification, the two recombinant proteins were subjected to an analgesic activity assay in mice and whole-cell patchclamp recording of hNav1.7-CHO cell lines. Functional tests showed that BmKBTx and BmNaL- 3SS2 have analgesic activity in mice and can interact with the hNav1.7 subtype of the voltage-gated sodium channel (VGSC). Scorpion venom is rich in bioactive proteins, but most of their functions are unknown to us. This study has increased our knowledge of these novel disulfide-bridged peptides (DBPs) and their biological activities. Copyright© Bentham Science Publishers; For any queries, please email at epub@benthamscience.org.

  16. Random myosin loss along thick-filaments increases myosin attachment time and the proportion of bound myosin heads to mitigate force decline in skeletal muscle

    PubMed Central

    Tanner, Bertrand C.W.; McNabb, Mark; Palmer, Bradley M.; Toth, Michael J.; Miller, Mark S.

    2014-01-01

    Diminished skeletal muscle performance with aging, disuse, and disease may be partially attributed to the loss of myofilament proteins. Several laboratories have found a disproportionate loss of myosin protein content relative to other myofilament proteins, but due to methodological limitations, the structural manifestation of this protein loss is unknown. To investigate how variations in myosin content affect ensemble cross-bridge behavior and force production we simulated muscle contraction in the half-sarcomere as myosin was removed either i) uniformly, from the Z-line end of thick-filaments, or ii) randomly, along the length of thick-filaments. Uniform myosin removal decreased force production, showing a slightly steeper force-to-myosin content relationship than the 1:1 relationship that would be expected from the loss of cross-bridges. Random myosin removal also decreased force production, but this decrease was less than observed with uniform myosin loss, largely due to increased myosin attachment time (ton) and fractional cross-bridge binding with random myosin loss. These findings support our prior observations that prolonged ton may augment force production in single fibers with randomly reduced myosin content from chronic heart failure patients. These simulation also illustrate that the pattern of myosin loss along thick-filaments influences ensemble cross-bridge behavior and maintenance of force throughout the sarcomere. PMID:24486373

  17. Photographic copy of circa, 1934 black and white photograph. Loose ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa, 1934 black and white photograph. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. DECK TRUSS UNDER CONSTRUCTION BETWEEN PIERS C, B, AND V TAKEN AT GROUND LEVEL FROM EAST BANK. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  18. 10. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    10. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1919. Vol. I, RG 75, Entry 655, BOx 25, National Archives, Washington, D.C.) Photographer unknown. SACATION DAM SITE LOOKING SOUTH SHOWING HEADWORKS OF SAN TAN FLOOD-WATER CANAL - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  19. 23. Photographic copy of photograph. (Source: U.S. Department of interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    23. Photographic copy of photograph. (Source: U.S. Department of interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1926. Vol. I, Narrative and Photographs, RG 75, Entry 655, Box 29, National Archives, Washington, DC.) Photographer unknown, SACATON DAM, NORTH SIDE SIPHON AND INTAKE GATES, 2/23/26 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  20. 22. Photographic copy of photograph. (Source: U.S. Department of Interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    22. Photographic copy of photograph. (Source: U.S. Department of Interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1926. Vol. I, Narrative and Photographs, RG 75, Entry 655, Box 29, National Archives, Washington, DC.) Photographer unknown. SACATON DAM, SOUTH END WITH CANAL AND ROADWAY, 8/29/25 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  1. α decay properties of 296Og within the two-potential approach

    NASA Astrophysics Data System (ADS)

    Deng, Jun-Gang; Zhao, Jie-Cheng; Chen, Jiu-Long; Wu, Xi-Jun; Li, Xiao-Hua

    2018-04-01

    The present work is a continuation of our previous paper [J.-G. Deng, et al., Chin. Phys. C, 41: 124109 (2017)]. In the present work, the α decay half-life of the unknown nucleus 296Og is predicted within the two-potential approach and the hindrance factors of all 20 even-even nuclei in the same region as 296Og, i.e. proton number 82

  2. Antibacterial effect of composite resin foundation material incorporating quaternary ammonium polyethyleneimine nanoparticles.

    PubMed

    Pietrokovski, Yoav; Nisimov, Ilana; Kesler-Shvero, Dana; Zaltsman, Natan; Beyth, Nurit

    2016-10-01

    As caries is the most frequent cause of the failure of composite resin-based restorations, composite resins with antibacterial properties are desirable. However, whether quaternary ammonium polyethyleneimine nanoparticles can be effectively incorporated is unknown. The purpose of this in vitro study was to evaluate the antibacterial activity against Streptococcus mutans and Actinomyces viscosus of a foundation material incorporating quaternary ammonium polyethyleneimine (QPEI) nanoparticles. QPEI antimicrobial nanoparticles were incorporated in a commercially available foundation material (Q Core; BJM Laboratories Ltd) at 1% wt/wt. Antibacterial efficacy against S mutans (10 6 colony-forming units [CFU]/mL) and A viscosus (10 6 CFU/mL) was examined by the direct contact test (DCT), and the agar diffusion test (ADT) with and without surface polishing. Bacterial outgrowth was recorded with a spectrophotometer. Growth of S mutans and A viscosus was inhibited, showing a decrease by 6 orders of magnitude in bacterial viability in specimens incorporating the nanoparticles, even after polishing the foundation material (P<.05). Growth inhibition was not observed in specimens without nanoparticles. Antibacterial properties can be achieved in a commercially available foundation material by incorporating polycationic antibacterial nanoparticles. This antibacterial effect did not diminish after surface polishing. Copyright © 2016 Editorial Council for the Journal of Prosthetic Dentistry. Published by Elsevier Inc. All rights reserved.

  3. Theory of fracture mechanics based upon plasticity

    NASA Technical Reports Server (NTRS)

    Lee, J. D.

    1976-01-01

    A theory of fracture mechanics is formulated on the foundation of continuum mechanics. Fracture surface is introduced as an unknown quantity and is incorporated into boundary and initial conditions. Surface energy is included in the global form of energy conservation law and the dissipative mechanism is formulated into constitutive equations which indicate the thermodynamic irreversibility and the irreversibility of fracture process as well.

  4. The Public Health Community Platform, Electronic Case Reporting, and the Digital Bridge.

    PubMed

    Cooney, Mary Ann; Iademarco, Michael F; Huang, Monica; MacKenzie, William R; Davidson, Arthur J

    At the intersection of new technology advancements, ever-changing health policy, and fiscal constraints, public health agencies seek to leverage modern technical innovations and benefit from a more comprehensive and cooperative approach to transforming public health, health care, and other data into action. State health agencies recognized a way to advance population health was to integrate public health with clinical health data through electronic infectious disease case reporting. The Public Health Community Platform (PHCP) concept of bidirectional data flow and knowledge management became the foundation to build a cloud-based system connecting electronic health records to public health data for a select initial set of notifiable conditions. With challenges faced and lessons learned, significant progress was made and the PHCP grew into the Digital Bridge, a national governance model for systems change, bringing together software vendors, public health, and health care. As the model and technology advance together, opportunities to advance future connectivity solutions for both health care and public health will emerge.

  5. An Empirical Model for Estimating the Probability of Electrical Short Circuits from Tin Whiskers-Part I

    NASA Technical Reports Server (NTRS)

    Courey, Karim; Wright, Clara; Asfour, Shihab; Bayliss, Jon; Ludwig, Larry

    2008-01-01

    Existing risk simulations make the assumption that when a free tin whisker has bridged two adjacent exposed electrical conductors, the result is an electrical short circuit. This conservative assumption is made because shorting is a random event that has a currently unknown probability associated with it. Due to contact resistance, electrical shorts may not occur at lower voltage levels. In this experiment, we study the effect of varying voltage on the breakdown of the contact resistance which leads to a short circuit. From this data, we can estimate the probability of an electrical short, as a function of voltage, given that a free tin whisker has bridged two adjacent exposed electrical conductors. In addition, three tin whiskers grown from the same Space Shuttle Orbiter card guide used in the aforementioned experiment were cross sectioned and studied using a focused ion beam (FIB).

  6. Null effects of boot camps and short-format training for PhD students in life sciences

    PubMed Central

    Feldon, David F.; Jeong, Soojeong; Peugh, James; Roksa, Josipa; Maahs-Fladung, Cathy; Shenoy, Alok; Oliva, Michael

    2017-01-01

    Many PhD programs incorporate boot camps and summer bridge programs to accelerate the development of doctoral students’ research skills and acculturation into their respective disciplines. These brief, high-intensity experiences span no more than several weeks and are typically designed to expose graduate students to data analysis techniques, to develop scientific writing skills, and to better embed incoming students into the scholarly community. However, there is no previous study that directly measures the outcomes of PhD students who participate in such programs and compares them to the outcomes of students who did not participate. Likewise, no previous study has used a longitudinal design to assess these outcomes over time. Here we show that participation in such programs is not associated with detectable benefits related to skill development, socialization into the academic community, or scholarly productivity for students in our sample. Analyzing data from 294 PhD students in the life sciences from 53 US institutions, we found no statistically significant differences in outcomes between participants and nonparticipants across 115 variables. These results stand in contrast to prior studies presenting boot camps as effective interventions based on participant satisfaction and perceived value. Many universities and government agencies (e.g., National Institutes of Health and National Science Foundation) invest substantial resources in boot camp and summer bridge activities in the hopes of better supporting scientific workforce development. Our findings do not reveal any measurable benefits to students, indicating that an allocation of limited resources to alternative strategies with stronger empirical foundations warrants consideration. PMID:28847929

  7. Reestablishment of an Unknown State and Its Orthogonal Complement State with Assistance

    NASA Astrophysics Data System (ADS)

    Chen, Ai-Xi; Wu, Shu-Dong

    2003-12-01

    In this paper, we propose a protocol where one can realize reestablishment of an unknown state and its orthogonal complement state with a certain probability. In the first stage of the protocol, teleportation is performed between Alice (a sender) and Bob (a receiver) through a nonmaximally entangled quantum channel. In the process of teleportation, Alice performs nonmaximally entangled state measurement. In the second stage of the protocol, Victor (a state preparer) disentangles leftover nonmaximally entangled states by a single-particle measurement. With the assistance of Victor Alice can reestablish the original state or produce its orthogonal state. The project partially supported by National Natural Science Foundation of China under Grant Nos. 90103026 and 60078023

  8. Probabilistic Teleportation of One-Particle State of S-level

    NASA Astrophysics Data System (ADS)

    Yan, Feng-Li; Bai, Yan-Kui

    2003-09-01

    A scheme for probabilistically teleporting an unknown one-particle state of S-level by a group of pairs of partially entangled 2-level particle state is proposed. In this scheme unitary transformation and local measurement take the place of Bell state measurement, then proper unitary transformation and the measurement on an auxiliary qubit with the aid of classical communication are performed. In this way the unknown one-particle state of S-level can be transferred onto a group of remote 2-level particles with certain probability. Furthermore, the receiver can recover the initial signal state on an S-level particle at his hand. The project supported by Natural Science Foundation of Hebei Province of China

  9. Structure and Location of the Regulatory β Subunits in the (αβγδ)4 Phosphorylase Kinase Complex* ♦

    PubMed Central

    Nadeau, Owen W.; Lane, Laura A.; Xu, Dong; Sage, Jessica; Priddy, Timothy S.; Artigues, Antonio; Villar, Maria T.; Yang, Qing; Robinson, Carol V.; Zhang, Yang; Carlson, Gerald M.

    2012-01-01

    Phosphorylase kinase (PhK) is a hexadecameric (αβγδ)4 complex that regulates glycogenolysis in skeletal muscle. Activity of the catalytic γ subunit is regulated by allosteric activators targeting the regulatory α, β, and δ subunits. Three-dimensional EM reconstructions of PhK show it to be two large (αβγδ)2 lobes joined with D2 symmetry through interconnecting bridges. The subunit composition of these bridges was unknown, although indirect evidence suggested the β subunits may be involved in their formation. We have used biochemical, biophysical, and computational approaches to not only address the quaternary structure of the β subunits within the PhK complex, i.e. whether they compose the bridges, but also their secondary and tertiary structures. The secondary structure of β was determined to be predominantly helical by comparing the CD spectrum of an αγδ subcomplex with that of the native (αβγδ)4 complex. An atomic model displaying tertiary structure for the entire β subunit was constructed using chemical cross-linking, MS, threading, and ab initio approaches. Nearly all this model is covered by two templates corresponding to glycosyl hydrolase 15 family members and the A subunit of protein phosphatase 2A. Regarding the quaternary structure of the β subunits, they were directly determined to compose the four interconnecting bridges in the (αβγδ)4 kinase core, because a β4 subcomplex was observed through both chemical cross-linking and top-down MS of PhK. The predicted model of the β subunit was docked within the bridges of a cryoelectron microscopic density envelope of PhK utilizing known surface features of the subunit. PMID:22969083

  10. Photographic copy of 8” x 10” black and white photograph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of 8” x 10” black and white photograph of photograph of Franklin M. Masters (1883–1974). Photographer unknown: Loose in separate folder in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. PHOTOGRAPH OF FRANKLIN M. MASTERS (1883-1974). - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  11. Photographic copy of circa 1933, 10” x 15” black and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa 1933, 10” x 15” black and white aerial photograph. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. AERIAL PHOTOGRAPH SHOWING CONSTRUCTION OF PIERS A, I, II, AND III BEGINNING ON EAST BANK OF RIVER. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  12. Photographic copy of 8” x 10” black and white photograph ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of 8” x 10” black and white photograph of photograph of Ralph Modjeski (1861–1940). Photographer unknown: Loose in separate folder in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. PHOTOGRAPH OF RALPH MODJESKI (1861 - 1940). - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  13. Photographic copy of circa 1934, black and white photograph. Located ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa 1934, black and white photograph. Located loose in oversized box at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. CIRCA 1934 PHOTOGRAPH TAKEN ON WEST BANK APPROACH ROADWAY LOOKING NORTHEAST TOWARD EAST BANK SHOWING DETAIL OF RAILING AND DECORATIVE LIGHT STANDARD AND FIXTURE. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  14. Photographic copy of circa 1933, 10” x 15” black and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa 1933, 10” x 15” black and white aerial photograph. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. AERIAL PHOTOGRAPH SHOWING EAST BANK CONSTRUCTION OF PIER A AND I AND COMPLETED CONSTRUCTION TRESTLE. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  15. Heterochromatin position effects on circularized sex chromosomes cause filicidal embryonic lethality in Drosophila melanogaster.

    PubMed

    Ferree, Patrick M; Gomez, Karina; Rominger, Peter; Howard, Dagnie; Kornfeld, Hannah; Barbash, Daniel A

    2014-04-01

    Some circularized X-Y chromosomes in Drosophila melanogaster are mitotically unstable and induce early embryonic lethality, but the genetic basis is unknown. Our experiments suggest that a large region of X-linked satellite DNA causes anaphase bridges and lethality when placed into a new heterochromatic environment within certain circularized X-Y chromosomes. These results reveal that repetitive sequences can be incompatible with one another in cis. The lethal phenotype also bears a remarkable resemblance to a case of interspecific hybrid lethality.

  16. 24. Photographic copy of photograph. (Source: U.S. Department of interior. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    24. Photographic copy of photograph. (Source: U.S. Department of interior. Office of Indian Affairs. Indian Irrigation Service. Annual Report, Fiscal Year 1928. Vol I. Irrigation District #4, California and Southern Arizona, RG 75, BIA-Phoenix, Box 40, National Archives, Pacific Southwest Region) Photographer unknown. SACATON DAM, CONDUIT ANCHORING AND REINFORCING STEEL, APRIL 10, 1928 - San Carlos Irrigation Project, Sacaton Dam & Bridge, Gila River, T4S R6E S12/13, Coolidge, Pinal County, AZ

  17. Two-dimensional fracture analysis of piezoelectric material based on the scaled boundary node method

    NASA Astrophysics Data System (ADS)

    Shen-Shen, Chen; Juan, Wang; Qing-Hua, Li

    2016-04-01

    A scaled boundary node method (SBNM) is developed for two-dimensional fracture analysis of piezoelectric material, which allows the stress and electric displacement intensity factors to be calculated directly and accurately. As a boundary-type meshless method, the SBNM employs the moving Kriging (MK) interpolation technique to an approximate unknown field in the circumferential direction and therefore only a set of scattered nodes are required to discretize the boundary. As the shape functions satisfy Kronecker delta property, no special techniques are required to impose the essential boundary conditions. In the radial direction, the SBNM seeks analytical solutions by making use of analytical techniques available to solve ordinary differential equations. Numerical examples are investigated and satisfactory solutions are obtained, which validates the accuracy and simplicity of the proposed approach. Project supported by the National Natural Science Foundation of China (Grant Nos. 11462006 and 21466012), the Foundation of Jiangxi Provincial Educational Committee, China (Grant No. KJLD14041), and the Foundation of East China Jiaotong University, China (Grant No. 09130020).

  18. The Genetics Revolution: Programs and Issues for the Community College. A Monograph Highlighting the Winners of the Exxon Education Foundation Innovation Awards.

    ERIC Educational Resources Information Center

    Mays, Marilyn Elaine, Ed.

    Presented at a 1996 conference on the implications of the Human Genome Project for community and technical colleges, the 30 papers included in this monograph describe methods for incorporating genetics studies into the two-year college curriculum. Among the papers provided are: (1) "Facing the Unknown: The Ethical Challenges of…

  19. Supervising the Unknown: A Qualitative Study of the Supervisory Relationship between Senior Student Affairs Officers and Mid-Level Managers

    ERIC Educational Resources Information Center

    Carey, Christopher G.

    2016-01-01

    Synergistic supervision has been commonly utilized as a foundation for practice in the field of student affairs. Numerous studies focus on the use of synergistic supervision with new professionals, but there is limited research on how it influences the supervision of mid-level managers. The role of the mid-level manager is important because of its…

  20. A Comparison of Course Completion, Satisfaction, Achievement, and Performance among Non-Profit Professionals Who Complete Andragogical or Pedagogical Online Learning Modules on Grant Writing

    ERIC Educational Resources Information Center

    Bradley, Joe Bernard, Jr.

    2010-01-01

    The purpose of this study was to compare the outcomes among staff members of nonprofit social service agencies who participated in or completed an andragogically-facilitated or a pedagogically-conducted online learning module on foundation grant writing. The efficacy of andragogical methods is unknown and often debated due to scarce empirical…

  1. [Stereotypic movements].

    PubMed

    Fernández-Alvarez, E

    2003-02-01

    Stereotypic movements are repetitive patterns of movement with certain peculiar features that make them especially interesting. Their physiopathology and their relationship with the neurobehavioural disorders they are frequently associated with are unknown. In this paper our aim is to offer a simple analysis of their dominant characteristics, their differentiation from other processes and a hypothesis of the properties of stereotypic movements, which could all set the foundations for research work into their physiopathology.

  2. Apodized grating coupler using fully-etched nanostructures

    NASA Astrophysics Data System (ADS)

    Wu, Hua; Li, Chong; Li, Zhi-Yong; Guo, Xia

    2016-08-01

    A two-dimensional apodized grating coupler for interfacing between single-mode fiber and photonic circuit is demonstrated in order to bridge the mode gap between the grating coupler and optical fiber. The grating grooves of the grating couplers are realized by columns of fully etched nanostructures, which are utilized to digitally tailor the effective refractive index of each groove in order to obtain the Gaussian-like output diffractive mode and then enhance the coupling efficiency. Compared with that of the uniform grating coupler, the coupling efficiency of the apodized grating coupler is increased by 4.3% and 5.7%, respectively, for the nanoholes and nanorectangles as refractive index tunes layer. Project supported by the National Natural Science Foundation of China (Grant Nos. 61222501, 61335004, and 61505003), the Specialized Research Fund for the Doctoral Program of Higher Education of China (Grant No. 20111103110019), the Postdoctoral Science Foundation of Beijing Funded Project, China (Grant No. Q6002012201502), and the Science and Technology Research Project of Jiangxi Provincial Education Department, China (Grant No. GJJ150998).

  3. Building effective working relationships across culturally and ethnically diverse communities.

    PubMed

    Hosley, Cheryl A; Gensheimer, Linda; Yang, Mai

    2003-01-01

    Amherst H. Wilder Foundation's Social Adjustment Program for Southeast Asians is implementing two collaborative, best practice, mental health and substance abuse prevention service models in Minnesota. It faced several issues in effectively bridging multiple cultural groups, including building a diverse collaborative team, involving families and youth, reconciling cultural variation in meeting styles, and making best practice models culturally appropriate. Researchers and program staff used multiple strategies to address these challenges and build successful partnerships. Through shared goals, flexibility, and a willingness to explore and address challenges, collaboratives can promote stronger relationships across cultural communities and improve their service delivery systems.

  4. Flood Early Warning in Bridge Management System: from idea to implementation

    NASA Astrophysics Data System (ADS)

    Kerin, Igor; Bekić, Damir; Michalis, Panagiotis; Šolman, Hrvoje; Cahill, Paul; Gilja, Gordon; Pakrashi, Vikram; Lapthorne, John; McKeogh, Eamon

    2017-04-01

    Recent advances in computational speed, cloud systems and GPRS data are some of the factors that have resulted in an increased number of operational and fully automatized Flood Early Warning Systems (FEWS). Flood forecasting is becoming a well-recognised solution for flood management as an indirect measure for minimising the risk should preventive or defence measures prove ineffective or are not feasible for implementation. Public acceptance of FEWS as a standalone solution is still considered to be at low level. Further public engagement regarding engineering risks and providing timely notifications and warnings can, however, establish the true value of such a system to the society in general. Flood risks can be direct, resulting in damage to buildings, infrastructure and natural resources, or indirect, which can be related to disaster losses leading to declines in commercial output or revenue and impact on wellbeing of people, typically from disruptions to the flow of goods and services. Flood risk and structural risks are closely related, thereby impacting the maintenance and management of bridges assets over watercourses. Many studies indicate that most bridge collapses are related to hydraulic effects and consequently scour issues (i.e. the removal of riverbed around bridge foundations due to flowing water). Consequently, hydraulic, hydrologic and geotechnical expertise and knowledge can lead to introducing FEWS as a key tool for Bridge Scour Management System (BSMS), forming a part of a BMS. The implementation of this concept was initiated with the EU/FP7 funded project BRIDGE SMS. The project introduces BSMS into the overall BMS to develop a reliable decision support tool which would efficiently manage bridge failure risks in a cost-effective way. This is accomplished through the development of FEWS, alongside monitoring systems that can provide important information about environmental and structural conditions at the catchment area and bridge site respectively. The recorded rainfall from instrumentation deployed over a catchment is used as input data for hydrological modelling and now-casting, which results in flow hydrographs at the bridge containing flow rates and water level information. Soil moisture data is also used to determine the appropriate hydrological model set-up, such as dry, medium or saturated catchment conditions. The output from the hydrological model is a now-cast flow hydrograph, with a lag time of up to 24 hours. Discharge hydrograph is correlated to water levels using an existing rating curve and to the flow velocity using discharge-flow velocity curve. Water levels and flow rates are correlated to the flow velocity which provide the basis for the prediction of scour depth. FEWS in BMS introduces readiness for extreme flood events, pointing out key indicators prior to an event. Also, by considering climate change effects which is resulting in more extreme weather phenomena's, FEWS provides important information about bridge safety and assists to coordinate resources in an efficient and cost-effective way. Acknowledgement The authors wish to acknowledge the financial support of the European Commission, through the Marie-Curie Industry-Academia Partnership and Pathways Network BRIDGE SMS (Intelligent Bridge Assessment Maintenance and Management System) - FP7-People-2013-IAPP- 612517.

  5. Repair and Protection of Small Railway Viaduct with Jammed Span at the Mining Influence

    NASA Astrophysics Data System (ADS)

    Bętkowski, Piotr

    2017-10-01

    This paper is about the maintenance of bridge objects on mining areas. Based on several years of observation is shown as functional parameters and technical conditions were deteriorated. As a result of the mining area deformations appeared among others following damages: block of bearings, jam of span, cracks on the abutments. The article describes series of clever maintenance repairs (such as the restoration of displacement freedom on non-standard tangent bearings) which enabled the exploitation of the viaduct without interruptions of railway communication. The region of the bridge is planned to further mining activities, which prejudged, that a repair of the viaduct was necessary to realization. The article discusses the predicted mining area deformation and analyses their influence on the bridge structure. Repair of the viaduct is a comprehensive example of the mining facility protection with the restoration of the expansion joints, bearings replacement, widening benches under bearings, stitching cracks and strengthening abutments, recreating the isolation and the drainage system damaged by mining influences, performance strut in the foundation level. An important element in determining the durability of repair is the selection of appropriate materials and repair technology, which is analysed in the article. All of these tasks completed in less than four months. Article illustrates the photo documentation made before and after repairs and technical drawings that show the range of the repairs.

  6. Thermodynamics, ecology and evolutionary biology: A bridge over troubled water or common ground?

    NASA Astrophysics Data System (ADS)

    Skene, Keith R.

    2017-11-01

    This paper addresses a key issue confronting ecological and evolutionary biology, namely the challenge of a cohesive approach to these fields given significant differences in the concepts and foundations of their study. Yet these two areas of scientific research are paramount in terms addressing the spatial and temporal dynamics and distribution of diversity, an understanding of which is needed if we are to resolve the current crisis facing the biosphere. The importance of understanding how nature responds to change is now of essential rather than of metaphysical interest as our planet struggles with increasing anthropogenic damage. Ecology and evolutionary biology can no longer remain disjointed. While some progress has been made in terms of synthetic thinking across these areas, this has often been in terms of bridge building, where thinking in one aspect is extended over to the other side. We review these bridges and the success or otherwise of such efforts. This paper then suggests that in order to move from a descriptive to a mechanistic understanding of the biosphere, we may need to re-evaluate our approach to the studies of ecology and evolutionary biology, finding a common denominator that will enable us to address the critical issues facing us, particularly in terms of understanding what drives change, what determines tempo and how communities function. Common ground, we argue, is essential if we are to comprehend how resilience operates in the natural world and how diversification can counter increasing extinction rates. This paper suggests that thermodynamics may provide a bridge between ecology and evolutionary biology, and that this will enable us to move forward with otherwise intractable problems.

  7. Utilization of bagasse and coconut fibers waste as fillers of sandwich composite for bridge railway sleepers

    NASA Astrophysics Data System (ADS)

    Soehardjo, K. A.; Basuki, A.

    2017-07-01

    The bridge railway sleepers is an essential component in the construction of railways, as the foundation of the rail support in order to withstand the load a train that runs above it. Sleepers used in bridge construction are expected to have a longer service life, lighter weight and durable so that can be used more efficient. This research was carried out to create a model of bridges railway sleepers made of sandwich structured composite from fiber glass, epoxy resin with fillers waste of bagasse (sugar cane pulp mill) or coconut fiberboard (copra industry) that using polyurethane as an adhesive. The process of making was conditioned for small and medium industrial applications. Railway sleepers’ specifications adapted to meet the requirements of end user. The process steps in this research include; lay-up fiberglass combined with bagasse/coconut fiberboard (as fillers), gluing with epoxy resin, molded it with pressure to be solid, curing after solidification process. The specimens of composite, bagasse and coconut fiber board were tested for tensile and compressive strength. The prototype were tested of mechanical test: flexural moment test to the stand rail, flexural moment test to the middle of the sleepers and tensile strength test on one side of the sleepers, in accordance to SNI 11-3388-1994 Method testing of single block concrete sleepers and bearing single rail fastening systems. The results of mechanical testing all variations meet the technical specifications of end user such as test results for flexural moment on all prototypes, after load test, there is no visible crack. While in the tensile strength test, it seem the prototype with coconut fiberboard filler, shows better performance than bagasse fiberboard filler, the decisions is just depended on techno economic and lifetime.

  8. Urban Climate Change Resilience as a Teaching Tool for a STEM Summer Bridge Program

    NASA Astrophysics Data System (ADS)

    Rosenzweig, B.; Vorosmarty, C. J.; Socha, A.; Corsi, F.

    2015-12-01

    Community colleges have been identified as important gateways for the United States' scientific workforce development. However, students who begin their higher education at community colleges often face barriers to developing the skills needed for higher-level STEM careers, including basic training in mathematics, programming, analytical problem solving, and cross-disciplinary communication. As part of the Business Higher Education Forum's Undergraduate STEM Interventions in Industry (USI2) Consortium, we are developing a summer bridge program for students in STEM fields transferring from community college to senior (4-year) colleges at the City University of New York. Our scientific research on New York City climate change resilience will serve as the foundation for the bridge program curriculum. Students will be introduced to systems thinking and improve their analytical skills through guided problem-solving exercises using the New York City Climate Change Resilience Indicators Database currently being developed by the CUNY Environmental Crossroads Initiative. Students will also be supported in conducting an introductory, independent research project using the database. The interdisciplinary nature of climate change resilience assessment will allow students to explore topics related to their STEM field of interest (i.e. engineering, chemistry, and health science), while working collaboratively across disciplines with their peers. We hope that students that participate in the bridge program will continue with their research projects through their tenure at senior colleges, further enhancing their academic training, while actively contributing to the study of urban climate change resilience. The effectiveness of this approach will be independently evaluated by NORC at the University of Chicago, as well as through internal surveying and long-term tracking of participating student cohorts.

  9. Computational, Experimental and Engineering Foundations of Ionic Channels as Miniaturized Sensors, Devices and Systems

    DTIC Science & Technology

    2003-10-01

    made in an ensemble of channels of unknown orientation and number, preventing quantitative analysis . • Currents have been compared among continuum PNP...microfluidic) analysis of ion channels to obtain fundamental insights into the selectivity, conductivity, and sensitivity of ion channels [19], [6...1.1 Develop fast and efficient simulators for steady-state analysis of continuum model for extraction of I-V curves. 1.2 Create

  10. Trends in the use of mechanical circulatory support as a bridge to heart transplantation across different age groups.

    PubMed

    Ciarka, Agnieszka; Edwards, Leah; Nilsson, Johan; Stehlik, Josef; Lund, Lars H

    2017-03-15

    Numerous cohort analyses suggest rapidly increasing use of mechanical circulatory support (MCS) as a bridge to heart transplantation (HTx), but the role of age in selection for MCS remains unknown. We assessed adult HTx in the International Society for Heart And Lung Transplantation Registry between 2005 and 2013 and we determined MCS use by recipient age group and transplant year. Multivariable logistic regression models were constructed to identify variables associated with continuous flow (CF) left ventricular assist device (LVAD) use within each age group. Among 16,480 HTx recipients the percentage of overall MCS use increased from 23% to 38%, 21% to 41%, and 17% to 42% in age groups 18-39 years, 40-59 years and over 60 years, respectively. This effect was mainly due to an increase in CF LVAD use and primarily in HTx recipients aged over 60. In multivariable analyses, male gender and blood group O were significantly associated with CF LVAD use in all age groups. Bridge to transplant MCS use increased dramatically between 2005 and 2013 primarily due to increased use of CF LVAD and primarily in higher ages. Pre-HTx CF LVAD use was more frequent in men and blood group O. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  11. Cyanide-limited complexation of molybdenum(III): synthesis of octahedral [Mo(CN)(6)](3-) and cyano-bridged [Mo(2)(CN)(11)](5-).

    PubMed

    Beauvais, Laurance G; Long, Jeffrey R

    2002-03-13

    Octahedral coordination of molybdenum(III) is achieved by limiting the amount of cyanide available upon complex formation. Reaction of Mo(CF(3)SO(3))(3) with LiCN in DMF affords Li(3)[Mo(CN)(6)] x 6DMF (1), featuring the previously unknown octahedral complex [Mo(CN)(6)](3-). The complex exhibits a room-temperature moment of mu(eff) = 3.80 mu(B), and assignment of its absorption bands leads to the ligand field parameters Delta(o) = 24800 cm(-1) and B = 247 cm(-1). Further restricting the available cyanide in a reaction between Mo(CF(3)SO(3))(3) and (Et(4)N)CN in DMF, followed by recrystallization from DMF/MeOH, yields (Et(4)N)(5)[Mo(2)(CN)(11)] x 2DMF x 2MeOH (2). The dinuclear [Mo(2)(CN)(11)](5-) complex featured therein contains two octahedrally coordinated Mo(III) centers spanned by a bridging cyanide ligand. A fit to the magnetic susceptibility data for 2, gives J = -113 cm(-1) and g = 2.33, representing the strongest antiferromagnetic coupling yet observed through a cyanide bridge. Efforts to incorporate these new complexes in magnetic Prussian blue-type solids are ongoing.

  12. Design of Rock Slope Reinforcement: An Himalayan Case Study

    NASA Astrophysics Data System (ADS)

    Tiwari, Gaurav; Latha, Gali Madhavi

    2016-06-01

    The stability analysis of the two abutment slopes of a railway bridge proposed at about 359 m above the ground level, crossing a river and connecting two hill faces in the Himalayas, India, is presented. The bridge is located in a zone of high seismic activity. The rock slopes are composed of a heavily jointed rock mass and the spacing, dip and dip direction of joint sets are varying at different locations. Geological mapping was carried out to characterize all discontinuities present along the slopes. Laboratory and field investigations were conducted to assess the geotechnical properties of the intact rock, rock mass and joint infill. Stability analyses of these rock slopes were carried out using numerical programmes. Loads from the foundations resting on the slopes and seismic accelerations estimated from site-specific ground response analysis were considered. The proposed slope profile with several berms between successive foundations was simulated in the numerical model. An equivalent continuum approach with Hoek and Brown failure criterion was initially used in a finite element model to assess the global stability of the slope abutments. In the second stage, finite element analysis of rock slopes with all joint sets with their orientations, spacing and properties explicitly incorporated into the numerical model was taken up using continuum with joints approach. It was observed that the continuum with joints approach was able to capture the local failures in some of the slope sections, which were verified using wedge failure analysis and stereographic projections. Based on the slope deformations and failure patterns observed from the numerical analyses, rock anchors were designed to achieve the target factors of safety against failure while keeping the deformations within the permissible limits. Detailed design of rock anchors and comparison of the stability of slopes with and without reinforcement are presented.

  13. Moving force identification based on redundant concatenated dictionary and weighted l1-norm regularization

    NASA Astrophysics Data System (ADS)

    Pan, Chu-Dong; Yu, Ling; Liu, Huan-Lin; Chen, Ze-Peng; Luo, Wen-Feng

    2018-01-01

    Moving force identification (MFI) is an important inverse problem in the field of bridge structural health monitoring (SHM). Reasonable signal structures of moving forces are rarely considered in the existing MFI methods. Interaction forces are complex because they contain both slowly-varying harmonic and impact signals due to bridge vibration and bumps on a bridge deck, respectively. Therefore, the interaction forces are usually hard to be expressed completely and sparsely by using a single basis function set. Based on the redundant concatenated dictionary and weighted l1-norm regularization method, a hybrid method is proposed for MFI in this study. The redundant dictionary consists of both trigonometric functions and rectangular functions used for matching the harmonic and impact signal features of unknown moving forces. The weighted l1-norm regularization method is introduced for formulation of MFI equation, so that the signal features of moving forces can be accurately extracted. The fast iterative shrinkage-thresholding algorithm (FISTA) is used for solving the MFI problem. The optimal regularization parameter is appropriately chosen by the Bayesian information criterion (BIC) method. In order to assess the accuracy and the feasibility of the proposed method, a simply-supported beam bridge subjected to a moving force is taken as an example for numerical simulations. Finally, a series of experimental studies on MFI of a steel beam are performed in laboratory. Both numerical and experimental results show that the proposed method can accurately identify the moving forces with a strong robustness, and it has a better performance than the Tikhonov regularization method. Some related issues are discussed as well.

  14. Bridge to shared governance: developing leadership of frontline nurses.

    PubMed

    Dearmon, Valorie A; Riley, Bettina H; Mestas, Lisa G; Buckner, Ellen B

    2015-01-01

    Transforming health care systems to improve quality is the responsibility of nurse executives and frontline nurses alike, yet frontline nurses are often ill-prepared to share leadership and accountability needed for transformation. The aim of this qualitative study was to describe the process used to build leadership capacity of frontline nurses engaged in resolving operational failures interrupting nursing care. The leadership development process served to bridge staff transition to shared governance. This institutional review board-approved qualitative research was designed to identify the effects of mentoring by the chief nursing officer and faculty partners on leadership development of frontline nurses working to find solutions to operational failures. Twelve nurses from 4 medical surgical units participated in a Frontline Innovations' nurse-led interdisciplinary group, which met over 18 months. Transcriptions of audiotaped meetings were analyzed for emerging process and outcome themes. The transcripts revealed a robust leadership development journey of frontline nurses engaged in process improvement. Themes that emerged from the mentoring process included engagement, collaboration, empowerment, confidence, and lifelong learning. The mentoring process provided frontline nurses the leadership foundation necessary to initiate shared governance.

  15. Bridging analytical approaches for low-carbon transitions

    NASA Astrophysics Data System (ADS)

    Geels, Frank W.; Berkhout, Frans; van Vuuren, Detlef P.

    2016-06-01

    Low-carbon transitions are long-term multi-faceted processes. Although integrated assessment models have many strengths for analysing such transitions, their mathematical representation requires a simplification of the causes, dynamics and scope of such societal transformations. We suggest that integrated assessment model-based analysis should be complemented with insights from socio-technical transition analysis and practice-based action research. We discuss the underlying assumptions, strengths and weaknesses of these three analytical approaches. We argue that full integration of these approaches is not feasible, because of foundational differences in philosophies of science and ontological assumptions. Instead, we suggest that bridging, based on sequential and interactive articulation of different approaches, may generate a more comprehensive and useful chain of assessments to support policy formation and action. We also show how these approaches address knowledge needs of different policymakers (international, national and local), relate to different dimensions of policy processes and speak to different policy-relevant criteria such as cost-effectiveness, socio-political feasibility, social acceptance and legitimacy, and flexibility. A more differentiated set of analytical approaches thus enables a more differentiated approach to climate policy making.

  16. Translating Knowledge: The role of Shared Learning in Bridging the Science-Application Divide

    NASA Astrophysics Data System (ADS)

    Moench, M.

    2014-12-01

    As the organizers of this session state: "Understanding and managing our future relation with the Earth requires research and knowledge spanning diverse fields, and integrated, societally-relevant science that is geared toward solutions." In most cases, however, integration is weak and scientific outputs do not match decision maker requirements. As a result, while scientific results may be highly relevant to society that relevance is operationally far from clear. This paper explores the use of shared learning processes to bridge the gap between the evolving body of scientific information on climate change and its relevance for resilience planning in cities across Asia. Examples related to understanding uncertainty, the evolution of scientific knowledge from different sources, and data extraction and presentation are given using experiences generated over five years of work as part of the Rockefeller Foundation supported Asian Cities Climate Change Resilience Network and other programs. Results suggest that processes supporting effective translation of knowledge between different sources and different applications are essential for the identification of solutions that respond to the dynamics and uncertainties inherent in global change processes.

  17. Photographic copy of 3 ½” x 5” glass lantern slide ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of 3 ½” x 5” glass lantern slide no. 20 of drawing. Located in wooden pine box #23 in box 84 of 94 at the National Museum of American History, Smithsonian Institution, Archives Center, Work and industry Division, Washington, D.C. Original photographer, Milton R. Homes, Philadelphia, Pennsylvania. Illustrator Unknown. DRAWING ENTITLED “THE SAND ISLAND METHOD”. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  18. Photographic copy of circa 1933, 10” x 15” black and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa 1933, 10” x 15” black and white aerial photograph. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. AERIAL PHOTOGRAPH SHOWING CONSTRUCTION OF PIER NO.’S V AND B LOOKING AT WEST BANK APPROACH UNDER CONSTRUCTION. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  19. Photographic copy of circa 1933, 10” x 15” black and ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of circa 1933, 10” x 15” black and white aerial photograph. Loose in oversized box located at the National Museum of American History, Smithsonian Institution, Archives Center, Work and Industry Division, Washington, D.C. Original Photographer unknown. AERIAL PHOTOGRAPH SHOWING CONSTRUCTION OF PIER NO.’S III, 1V, V, AND B WITH WEST BANK APPROACH AT LOWER EDGE. - Huey P. Long Bridge, Spanning Mississippi River approximately midway between nine & twelve mile points upstream from & west of New Orleans, Jefferson, Jefferson Parish, LA

  20. Postnatal telomere dysfunction induces cardiomyocyte cell-cycle arrest through p21 activation

    PubMed Central

    Aix, Esther; Gutiérrez-Gutiérrez, Óscar; Sánchez-Ferrer, Carlota; Aguado, Tania

    2016-01-01

    The molecular mechanisms that drive mammalian cardiomyocytes out of the cell cycle soon after birth remain largely unknown. Here, we identify telomere dysfunction as a critical physiological signal for cardiomyocyte cell-cycle arrest. We show that telomerase activity and cardiomyocyte telomere length decrease sharply in wild-type mouse hearts after birth, resulting in cardiomyocytes with dysfunctional telomeres and anaphase bridges and positive for the cell-cycle arrest protein p21. We further show that premature telomere dysfunction pushes cardiomyocytes out of the cell cycle. Cardiomyocytes from telomerase-deficient mice with dysfunctional telomeres (G3 Terc−/−) show precocious development of anaphase-bridge formation, p21 up-regulation, and binucleation. In line with these findings, the cardiomyocyte proliferative response after cardiac injury was lost in G3 Terc−/− newborns but rescued in G3 Terc−/−/p21−/− mice. These results reveal telomere dysfunction as a crucial signal for cardiomyocyte cell-cycle arrest after birth and suggest interventions to augment the regeneration capacity of mammalian hearts. PMID:27241915

Top