Sample records for upgrade ground training

  1. 14 CFR 91.1101 - Pilots: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Pilots: Initial, transition, and upgrade ground training. 91.1101 Section 91.1101 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... runway limitations for takeoff and landing; (3) Enough meteorology to ensure a practical knowledge of...

  2. 14 CFR 91.1101 - Pilots: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Pilots: Initial, transition, and upgrade ground training. 91.1101 Section 91.1101 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... runway limitations for takeoff and landing; (3) Enough meteorology to ensure a practical knowledge of...

  3. 14 CFR 121.419 - Pilots and flight engineers: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...; (ix) Flight planning; (x) Each normal and emergency procedure; and (xi) The approved Airplane Flight... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Pilots and flight engineers: Initial... Program § 121.419 Pilots and flight engineers: Initial, transition, and upgrade ground training. (a...

  4. 14 CFR 121.419 - Pilots and flight engineers: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...; (ix) Flight planning; (x) Each normal and emergency procedure; and (xi) The approved Airplane Flight... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Pilots and flight engineers: Initial... Program § 121.419 Pilots and flight engineers: Initial, transition, and upgrade ground training. (a...

  5. 14 CFR 121.419 - Pilots and flight engineers: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...; (ix) Flight planning; (x) Each normal and emergency procedure; and (xi) The approved Airplane Flight... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Pilots and flight engineers: Initial... Program § 121.419 Pilots and flight engineers: Initial, transition, and upgrade ground training. Link to...

  6. 14 CFR 121.419 - Pilots and flight engineers: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...; (ix) Flight planning; (x) Each normal and emergency procedure; and (xi) The approved Airplane Flight... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Pilots and flight engineers: Initial... Program § 121.419 Pilots and flight engineers: Initial, transition, and upgrade ground training. (a...

  7. 14 CFR 121.419 - Pilots and flight engineers: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...; (ix) Flight planning; (x) Each normal and emergency procedure; and (xi) The approved Airplane Flight... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Pilots and flight engineers: Initial... Program § 121.419 Pilots and flight engineers: Initial, transition, and upgrade ground training. (a...

  8. 47 CFR 27.1164 - The cost-sharing formula.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...); installation; systems testing; FCC filing costs; site acquisition and civil works; zoning costs; training... upgrades for interference control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities...

  9. Performance Model of Intercity Ground Passenger Transportation Systems

    DOT National Transportation Integrated Search

    1975-08-01

    A preliminary examination of the problems associated with mixed-traffic operations - conventional freight and high speed passenger trains - is presented. Approaches based upon a modest upgrading of existing signal systems are described. Potential cos...

  10. 14 CFR 135.345 - Pilots: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ...; (9) Flight planning; (10) Each normal and emergency procedure; and (11) The approved Aircraft Flight... following, as applicable to their duties: (a) General subjects— (1) The certificate holder's flight locating...., flight controls, electrical, and hydraulic), other systems, as appropriate, principles of normal...

  11. 14 CFR 135.345 - Pilots: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ...; (9) Flight planning; (10) Each normal and emergency procedure; and (11) The approved Aircraft Flight... following, as applicable to their duties: (a) General subjects— (1) The certificate holder's flight locating...., flight controls, electrical, and hydraulic), other systems, as appropriate, principles of normal...

  12. 14 CFR 135.345 - Pilots: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ...; (9) Flight planning; (10) Each normal and emergency procedure; and (11) The approved Aircraft Flight... following, as applicable to their duties: (a) General subjects— (1) The certificate holder's flight locating...., flight controls, electrical, and hydraulic), other systems, as appropriate, principles of normal...

  13. 14 CFR 135.345 - Pilots: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...; (9) Flight planning; (10) Each normal and emergency procedure; and (11) The approved Aircraft Flight... following, as applicable to their duties: (a) General subjects— (1) The certificate holder's flight locating...., flight controls, electrical, and hydraulic), other systems, as appropriate, principles of normal...

  14. 14 CFR 135.345 - Pilots: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...; (9) Flight planning; (10) Each normal and emergency procedure; and (11) The approved Aircraft Flight... following, as applicable to their duties: (a) General subjects— (1) The certificate holder's flight locating...., flight controls, electrical, and hydraulic), other systems, as appropriate, principles of normal...

  15. How to Upgrade Your Physical Plant Program.

    ERIC Educational Resources Information Center

    American School and University, 1983

    1983-01-01

    An interview with the director of buildings and grounds for the Massapequa (New York) Public Schools, Emanual (Manny) Calligeros, reveals a new kind of physical plant administrator who can organize a maintenance and operations budget, evaluate and train personnel, analyze energy use, and negotiate contracts. (Author/MLF)

  16. 14 CFR 91.1101 - Pilots: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... consumption and cruise control; (9) Flight planning; (10) Each normal and emergency procedure; and (11) The..., DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT... manager's flight locating procedures; (2) Principles and methods for determining weight and balance, and...

  17. 14 CFR 91.1101 - Pilots: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... consumption and cruise control; (9) Flight planning; (10) Each normal and emergency procedure; and (11) The..., DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT... manager's flight locating procedures; (2) Principles and methods for determining weight and balance, and...

  18. 14 CFR 91.1101 - Pilots: Initial, transition, and upgrade ground training.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... consumption and cruise control; (9) Flight planning; (10) Each normal and emergency procedure; and (11) The..., DEPARTMENT OF TRANSPORTATION (CONTINUED) AIR TRAFFIC AND GENERAL OPERATING RULES GENERAL OPERATING AND FLIGHT... manager's flight locating procedures; (2) Principles and methods for determining weight and balance, and...

  19. DSN test and training system

    NASA Technical Reports Server (NTRS)

    Thorman, H. C.

    1975-01-01

    Key characteristics of the Deep Space Network Test and Training System were presented. Completion of the Mark III-75 system implementation is reported. Plans are summarized for upgrading the system to a Mark III-77 configuration to support Deep Space Network preparations for the Mariner Jupiter/Saturn 1977 and Pioneer Venus 1978 missions. A general description of the Deep Space Station, Ground Communications Facility, and Network Operations Control Center functions that comprise the Deep Space Network Test and Training System is also presented.

  20. Airport technology international 1993

    NASA Astrophysics Data System (ADS)

    Papagiorcopulo, George

    The present survey of developments in airport technologies and their management discusses airport extensions and upgradings, airport developments in China, polluter penalization, airport effects on environments, European ground-handling methods, ATC in Europe, EC duty-free sales at airports, and the privatization of airport security. Also discussed are airport advertising, new alternatives in air-cargo handling, ATC training, taxi-guidance systems, and the reduction of fuel consumption and emissions on the ground. (No individual items are abstracted in this volume)

  1. Time Synchronization Prototype, Server Upgrade Procedure Support and Remote Software Development

    NASA Technical Reports Server (NTRS)

    Sanders, Shania R.

    2014-01-01

    Networks are roadways of communication that connect devices. Like all roadways, there are rules and regulations that govern whatever (information in this case) travels along them. One type of rule that is commonly used is called a protocol. More specifically, a protocol is a standard that specifies how data should be transmitted over a network. The project outlined in this document seeks to implement one protocol in particular, Precision Time Protocol, within the Kennedy Ground Control Subsystem network at Kennedy Space Center. This document also summarizes work completed for server upgrades, remote software developer training and how all three assignments demonstrated the importance of accountability and security.

  2. Lessons Learned from Optical Payload for Lasercomm Science (OPALS) Mission Operations

    NASA Technical Reports Server (NTRS)

    Sindiy, Oleg V.; Abrahamson, Matthew J.; Biswas, Abhijit; Wright, Malcolm W.; Padams, Jordan H.; Konyha, Alexander L.

    2015-01-01

    This paper provides an overview of Optical Payload for Lasercomm Science (OPALS) activities and lessons learned during mission operations. Activities described cover the periods of commissioning, prime, and extended mission operations, during which primary and secondary mission objectives were achieved for demonstrating space-to-ground optical communications. Lessons learned cover Mission Operations System topics in areas of: architecture verification and validation, staffing, mission support area, workstations, workstation tools, interfaces with support services, supporting ground stations, team training, procedures, flight software upgrades, post-processing tools, and public outreach.

  3. 14 CFR 121.424 - Pilots: Initial, transition, and upgrade flight training.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... of being performed in an airplane simulator without a visual system; and (ii) A flight check in the... flight training. 121.424 Section 121.424 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... § 121.424 Pilots: Initial, transition, and upgrade flight training. (a) Initial, transition, and upgrade...

  4. 14 CFR 121.424 - Pilots: Initial, transition, and upgrade flight training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... of being performed in an airplane simulator without a visual system; and (ii) A flight check in the... flight training. 121.424 Section 121.424 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... § 121.424 Pilots: Initial, transition, and upgrade flight training. (a) Initial, transition, and upgrade...

  5. 14 CFR 121.424 - Pilots: Initial, transition, and upgrade flight training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... of being performed in an airplane simulator without a visual system; and (ii) A flight check in the... flight training. 121.424 Section 121.424 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... § 121.424 Pilots: Initial, transition, and upgrade flight training. (a) Initial, transition, and upgrade...

  6. 14 CFR 121.424 - Pilots: Initial, transition, and upgrade flight training.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... of being performed in an airplane simulator without a visual system; and (ii) A flight check in the... flight training. 121.424 Section 121.424 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... § 121.424 Pilots: Initial, transition, and upgrade flight training. (a) Initial, transition, and upgrade...

  7. Tractor Trailer Driver's Training Programs. Performance Report.

    ERIC Educational Resources Information Center

    New Hampshire Vocational Technical Coll., Nashua.

    This document describes a project to develop a 320-hour tractor trailer driver training program and a 20-hour commercial driver licensing upgrade training program. Of 34 graduates from the training program, 28 secured employment in the trucking industry. From August 1989 to June 1990, 725 students were trained in the upgrade training program with…

  8. 14 CFR 135.347 - Pilots: Initial, transition, upgrade, and differences flight training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... the aircraft simulator or training device; and (2) A flight check in the aircraft or a check in the... differences flight training. 135.347 Section 135.347 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... flight training. (a) Initial, transition, upgrade, and differences training for pilots must include...

  9. 14 CFR 135.347 - Pilots: Initial, transition, upgrade, and differences flight training.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... the aircraft simulator or training device; and (2) A flight check in the aircraft or a check in the... differences flight training. 135.347 Section 135.347 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... flight training. (a) Initial, transition, upgrade, and differences training for pilots must include...

  10. 14 CFR 135.347 - Pilots: Initial, transition, upgrade, and differences flight training.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... the aircraft simulator or training device; and (2) A flight check in the aircraft or a check in the... differences flight training. 135.347 Section 135.347 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... flight training. (a) Initial, transition, upgrade, and differences training for pilots must include...

  11. 14 CFR 135.347 - Pilots: Initial, transition, upgrade, and differences flight training.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... the aircraft simulator or training device; and (2) A flight check in the aircraft or a check in the... differences flight training. 135.347 Section 135.347 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... flight training. (a) Initial, transition, upgrade, and differences training for pilots must include...

  12. 14 CFR 135.347 - Pilots: Initial, transition, upgrade, and differences flight training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... the aircraft simulator or training device; and (2) A flight check in the aircraft or a check in the... differences flight training. 135.347 Section 135.347 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... flight training. (a) Initial, transition, upgrade, and differences training for pilots must include...

  13. Skill Upgrading, Incorporated. Final Report.

    ERIC Educational Resources Information Center

    Skill Upgrading, Inc., Baltimore, MD.

    As in two other projects in Cleveland and Newark, New Jersey, this project was set up in Baltimore to provide technical assistance in designing ways to meet in-plant skills needs by upgrading job skills on entry workers through High Intensity Training (HIT). Skill Upgrading, Inc. was established in Maryland to provide training and manpower…

  14. Development of a Portable, Ground-Based Ozone Lidar Instrument for Tropospheric Ozone Research and Educational Training

    NASA Technical Reports Server (NTRS)

    Chyba, Thomas; Zenker, Thomas

    1998-01-01

    The objective of this project is to develop a portable, eye-safe, ground-based ozone lidar instrument specialized for ozone differential absorption lidar (DIAL) measurements in the troposphere. This prototype instrument is intended to operate at remote field sites and to serve as the basic unit for monitoring projects requiring multi-instrument networks, such as that discussed in the science plan for the Global Tropospheric Ozone Project (GTOP). This instrument will be based at HU for student training in lidar technology as well as atmospheric ozone data analysis and interpretation. It will be also available for off-site measurement campaigns and will serve as a test bed for further instrument development. Later development beyond this grant to extend the scientific usefulness of the instrument may include incorporation of an aerosol channel and upgrading the laser to make stratospheric ozone measurements. Undergraduate and graduate students have been and will be active participants in this research effort.

  15. Positive train control test bed interoperability upgrades.

    DOT National Transportation Integrated Search

    2013-02-01

    Transportation Technology Center, Inc. (TTCI) upgraded the Positive Train Control (PTC) Test Bed to support additional PTC testing configurations under Federal Railroad Administration (FRA) Task Order 270. The scope of work provided additional PTC Co...

  16. Advanced Ground Systems Maintenance Cryogenics Test Lab Control System Upgrade Project

    NASA Technical Reports Server (NTRS)

    Harp, Janice Leshay

    2014-01-01

    This project will outfit the Simulated Propellant Loading System (SPLS) at KSC's Cryogenics Test Laboratory with a new programmable logic control system. The control system upgrade enables the Advanced Ground Systems Maintenace Element Integration Team and other users of the SPLS to conduct testing in a controls environment similar to that used at the launch pad.

  17. A Study to Compare the Failure Rates of Current Space Shuttle Ground Support Equipment with the New Pathfinder Equipment and Investigate the Effect that the Proposed GSE Infrastructure Upgrade Might Have to Reduce GSE Infrastructure Failures

    NASA Technical Reports Server (NTRS)

    Kennedy, Barbara J.

    2004-01-01

    The purposes of this study are to compare the current Space Shuttle Ground Support Equipment (GSE) infrastructure with the proposed GSE infrastructure upgrade modification. The methodology will include analyzing the first prototype installation equipment at Launch PAD B called the "Pathfinder". This study will begin by comparing the failure rate of the current components associated with the "Hardware interface module (HIM)" at the Kennedy Space Center to the failure rate of the neW Pathfinder components. Quantitative data will be gathered specifically on HIM components and the PAD B Hypergolic Fuel facility and Hypergolic Oxidizer facility areas which has the upgraded pathfinder equipment installed. The proposed upgrades include utilizing industrial controlled modules, software, and a fiber optic network. The results of this study provide evidence that there is a significant difference in the failure rates of the two studied infrastructure equipment components. There is also evidence that the support staff for each infrastructure system is not equal. A recommendation to continue with future upgrades is based on a significant reduction of failures in the new' installed ground system components.

  18. RBDMS, FracFocus, and Gateway Initiatives

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yates, Dan

    Award DE-FE-0000880 from the Department of Energy to the Ground Water Protection Council (GWPC) focuses on state and federal priorities in the areas of state RBDMS development, connectivity between state systems and FracFocus.org, and data sharing initiatives across agencies. The overarching goals of these projects are to: - upgrade the Risk Based Data Management System (RBDMS) to a web based application; - upgrade the RBDMS user interface to make it more intuitive and easier to use - increase connectivity between state RBDMS systems and FracFocus; - provide outreach to states and agencies through training programs, special meetings, and state bymore » state outreach on all deliverables; - provide greater functionality for non-IT users; - update and install RBDMS modules in additional state programs (IL, CA, WY, WV); and; - help make data access more transparent. The primary objective is to enhance the Risk Based Data Management System (RBDMS) by adding new components relevant to current environmental topics such as hydraulic fracturing, increasing field inspection capabilities, creating linkages between FracFocus and state programs, upgrading eForm capabilities, and analyzing potential for data sharing. The GWPC will work with state agencies to develop an RBDMS module(s) that meets these needs.« less

  19. The Hubble Space Telescope servicing missions: Past, present, and future operational challenges

    NASA Technical Reports Server (NTRS)

    Ochs, William R.; Barbehenn, George M.; Crabb, William G.

    1996-01-01

    The Hubble Space Telescope was designed to be serviced by the Space Shuttle to upgrade systems, replace failed components and boost the telescope into higher orbits. There exists many operational challenges that must be addressed in preparation for the execution of a servicing mission, including technical and managerial issues. The operational challenges faced by the Hubble operations and ground system project for the support of the first servicing mission and future servicing missions, are considered. The emphasis is on those areas that helped ensure the success of the mission, including training, testing and contingency planning.

  20. Captain upgrade CRM training: A new focus for enhanced flight operations

    NASA Technical Reports Server (NTRS)

    Taggart, William R.

    1993-01-01

    Crew Resource Management (CRM) research has resulted in numerous payoffs of applied applications in flight training and standardization of air carrier flight operations. This paper describes one example of how basic research into human factors and crew performance was used to create a specific training intervention for upgrading new captains for a major United States air carrier. The basis for the training is examined along with some of the specific training methods used, and several unexpeced results.

  1. MLP-1 on Crawler Transporter 2 (CT-2)

    NASA Image and Video Library

    2017-03-22

    Ground support technicians walk alongside NASA's upgraded crawler-transporter 2 (CT-2), carrying mobile launcher platform 1, as it slowly travels on the crawlerway at the agency's Kennedy Space Center in Florida. The crawler's upgrades and modifications will be monitored and tested under loaded conditions during its travel to the crawlerway Pad A/B split and back to the crawler yard to confirm it is ready to support the load of the mobile launcher carrying the Space Launch System with Orion atop for the first test flight, Exploration Mission 1. The Ground Systems Development and Operations Program at Kennedy is managing upgrades to the crawler.

  2. Upgrading Custom Simulink Library Components for Use in Newer Versions of Matlab

    NASA Technical Reports Server (NTRS)

    Stewart, Camiren L.

    2014-01-01

    The Spaceport Command and Control System (SCCS) at Kennedy Space Center (KSC) is a control system for monitoring and launching manned launch vehicles. Simulations of ground support equipment (GSE) and the launch vehicle systems are required throughout the life cycle of SCCS to test software, hardware, and procedures to train the launch team. The simulations of the GSE at the launch site in conjunction with off-line processing locations are developed using Simulink, a piece of Commercial Off-The-Shelf (COTS) software. The simulations that are built are then converted into code and ran in a simulation engine called Trick, a Government off-the-shelf (GOTS) piece of software developed by NASA. In the world of hardware and software, it is not uncommon to see the products that are utilized be upgraded and patched or eventually fade away into an obsolete status. In the case of SCCS simulation software, Matlab, a MathWorks product, has released a number of stable versions of Simulink since the deployment of the software on the Development Work Stations in the Linux environment (DWLs). The upgraded versions of Simulink has introduced a number of new tools and resources that, if utilized fully and correctly, will save time and resources during the overall development of the GSE simulation and its correlating documentation. Unfortunately, simply importing the already built simulations into the new Matlab environment will not suffice as it will produce results that may not be expected as they were in the version that is currently being utilized. Thus, an upgrade execution plan was developed and executed to fully upgrade the simulation environment to one of the latest versions of Matlab.

  3. Upgrading the Household Worker. Final Report (January 1967-September 1968).

    ERIC Educational Resources Information Center

    Willmart Services, Inc., Washington, DC.

    A total of 108 women from low-income families who were underemployed and unemployed and who needed to develop marketable skills were selected for a 9-week training course offered by an agency which was established to upgrade the economic and social status of the household worker. The experimental program combined attitudinal training with training…

  4. Maintenance Management Information and Control System (MMICS). Administrative Boon or Burden.

    DTIC Science & Technology

    1984-03-01

    training schools (fundamentals and theory ) for the particular career field; through correspondence courses developed and written by the Air Force, and...are identified, scheduled and done on a timely basis. 6 "The administration of an individual’s Upgrade Training ( UGT ) to meet the job knowledge and...formal OJT must study and complete a Career Develop- ment Course (CDC) as part of their upgrade training ( UGT ). The progress and status of the course is

  5. Upgrading Programs for Construction Journeymen. Final Report.

    ERIC Educational Resources Information Center

    Franklin, William S.

    The report describes a study of industry-sponsored upgrading programs for journeymen in construction unions. Interviews with union and training officials, as well as 405 journeymen and 99 contractors, revealed that upgrading activities were concentrated in electrical work, carpentry, and the pipe trades, and that both the number of programs and…

  6. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1988-01-01

    Deep Space Network and Systems topics addressed include: tracking and ground-base navigation; communications, spacecraft-ground; station control and system technology; capabilities for existing projects; and network upgrading and sustaining.

  7. Promon's participation in the Brasilsat program: first & second generations

    NASA Astrophysics Data System (ADS)

    Depaiva, Ricardo N.

    This paper presents an overview of the Brasilsat program, space and ground segments, developed by Hughes and Promon. Promon is a Brazilian engineering company that has been actively participating in the Brasilsat Satellite Telecommunications Program since its beginning. During the first generation, as subcontractor of the Spar/Hughes/SED consortium, Promon had a significant participation in the site installation of the Ground Segment, including the antennas. During the second generation, as partner of a consortium with Hughes, Promon participated in the upgrade of Brasilsat's Ground Segment systems: the TT&C (TCR1, TCR2, and SCC) and the COCC (Communications and Operations Control Center). This upgrade consisted of the design and development of hardware and software to support the second generation requirements, followed by integration and tests, factory acceptance tests, transport to site, site installation, site acceptance tests and warranty support. The upgraded systems are distributed over four sites with remote access to the main ground station. The solutions adopted provide a high level of automation, and easy operator interaction. The hardware and software technologies were selected to provide the flexibility to incorporate new technologies and services from the demanding satellite telecommunications market.

  8. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1987-01-01

    Topics addressed include: tracking and ground-based navigation; communications, spacecraft-ground; station control and system technology; capabilities for existing projects; network upgrade and sustaining; mission interface and support; and Ka-band capabilities.

  9. Allocating SMART Reliability and Maintainability Goals to NASA Ground Systems

    NASA Technical Reports Server (NTRS)

    Gillespie, Amanda; Monaghan, Mark

    2013-01-01

    This paper will describe the methodology used to allocate Reliability and Maintainability (R&M) goals to Ground Systems Development and Operations (GSDO) subsystems currently being designed or upgraded.

  10. Contractor Sales Training: Providing the Skills Necessary to Sell Comprehensive Home Energy Upgrades

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Billingsley, Megan; Stuart, Elizabeth

    2011-08-17

    Many comprehensive home energy efficiency programs rely on contractors as the customer-facing ‘front line’ to sell energy improvements. Adding sales skills to contractors’ existing technical expertise is key to converting more assessments into comprehensive home energy upgrades. Leading programs recognize the need to support contractors with sales and business training to help them succeed and to support the growth of the home performance industry for the long term. A number of contractor sales training efforts are emerging, including some programs that are seeing encouraging early results.

  11. Kongiganak Wind Turbine Replacement and System Upgrade Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Boonstra, Patrick

    2016-12-13

    The Native Village of Kongiganak, Alaska was awarded a grant to upgrade the braking systems on five wind turbines and upgrade the monitoring and data collection unit to insure that enough energy is available to power the utility. The project manager for this award is Intelligent Energy Systems, LLC located in Anchorage, Alaska. In addition to accomplishing these upgrades, it was the intent for a local wind tech crew to be trained in Kongiganak so that routine maintenance and future repairs will be made by local workers.

  12. Continuing Training in Firms and Trainer Development in Germany.

    ERIC Educational Resources Information Center

    Rieleit, Birgit; Selke, Reinhard

    German legislation contains provisions on both initial and further vocational training. Three types of continuing training are distinguished: retraining, updating training, and upgrading training. Industries contribute the largest share of funding and participants to continuing training. In-company continuing training differs greatly according to…

  13. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    NASA’s upgraded crawler-transporter 2 (CT-2) begins its trek from the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida to Launch Pad 39B to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the VAB. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  14. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    NASA’s upgraded crawler-transporter 2 (CT-2) has exited the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida for its trek along the crawlerway to Launch Pad 39B to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the VAB. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  15. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    NASA’s upgraded crawler-transporter 2 (CT-2) travels along the crawlerway from the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida on its trek to Launch Pad 39B to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the VAB. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  16. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    NASA’s upgraded crawler-transporter 2 (CT-2) travels along the crawlerway during its trek to Launch Pad 39B at the agency’s Kennedy Space Center in Florida, to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the Vehicle Assembly Building. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  17. Construction at Turn Basin

    NASA Image and Video Library

    2017-06-14

    Modifications are underway at the Launch Complex 39 turn basin wharf at NASA's Kennedy Space Center in Florida to prepare for the arrival of the agency's massive Space Launch System (SLS) core stage aboard the barge Pegasus. Precast concrete poles are being driven to a depth of about 70 feet into the bedrock below the water around the turn basin; later filled with concrete. The upgrades are necessary to accommodate the increased weight of the core stage along with ground support and transportation equipment aboard the modified barge Pegasus. The Ground Systems Development and Operations Program is overseeing the upgrades to the turn basin wharf.

  18. Turn Basin Construction

    NASA Image and Video Library

    2017-06-14

    Modifications are underway at the Launch Complex 39 turn basin wharf at NASA's Kennedy Space Center in Florida to prepare for the arrival of the agency's massive Space Launch System (SLS) core stage aboard the barge Pegasus. Precast concrete poles are being driven to a depth of about 70 feet into the bedrock below the water around the turn basin. The upgrades are necessary to accommodate the increased weight of the core stage along with ground support and transportation equipment aboard the modified barge Pegasus. The Ground Systems Development and Operations Program is overseeing the upgrades to the turn basin wharf.

  19. 14 CFR 91.1027 - Recordkeeping.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... initial, transition, upgrade, and differences training and each recurrent training phase required by this... of training required by § 91.1063, as applicable. (5) A current list of all fractional owners and...

  20. Space-to-Ground: Upgrading the Outpost:03/30/2018

    NASA Image and Video Library

    2018-03-29

    ISS crewmembers wrapped up a spacewalk and are now getting ready for a new delivery of science and research. NASA's Space to Ground is your weekly update on what's happening aboard the International Space Station.

  1. Magnetic Launch Assist

    NASA Technical Reports Server (NTRS)

    Jacobs, W. A.

    2000-01-01

    With the ever-increasing cost of getting to space and the need for safe, reliable, and inexpensive ways to access space, NASA is taking a look at technologies that will get us there. One of these technologies is Magnetic Launch Assist (MagLev). This is the concept of using both magnetic levitation and magnetic propulsion to provide an initial velocity by using electrical power from ground sources. The use of ground based power can significantly reduce operational costs over the consumables necessary to attain the same velocity. The technologies to accomplish this are both old and new. The concept of MagLev has been around for a long time and several MagLev Trains have already been made. Where NASA's MagLev diverges from the traditional train is in the immense power required to propel this vehicle to 600 feet per second in less than 10 seconds. New technologies or the upgrade of existing technologies will need to be investigated in areas of energy storage and power switching. Plus the separation of a very large mass (the space vehicle) and the aerodynamics of that vehicle while on the carrier are also of great concern and require considerable study and testing. NASA's plan is to mature these technologies in the next 10 years to achieve our goal of launching a full sized space vehicle off a MagLev rail.

  2. KSC-2014-1955

    NASA Image and Video Library

    2014-04-01

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, ground support technicians install new roller bearings on the C truck of crawler-transporter 2, or CT-2. Work continues in high bay 2 to upgrade CT-2. The modifications are designed to ensure CT-2’s ability to transport launch vehicles currently in development, such as the agency’s Space Launch System, to the launch pad. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter. Photo credit: NASA/Cory Huston

  3. Utilizing Regional Centers in Sustaining Upgraded Russian Federation Ministry of Defense Sites

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kaldenbach, Karen Yvonne; Chainikov, General Vladimir; Fedorov, General Victor

    2010-01-01

    Since the mid-1990s the governments of the United States (U.S.) and the Russian Federation (RF) have been collaborating on nonproliferation projects, particularly in the protection of nuclear material through the Department of Energy's (DOE) National Nuclear Security Administration (NNSA). To date, this collaboration has resulted in upgrades to more than 72 RF Ministry of Defense (MOD) sensitive sites and facilities. These upgrades include physical protection systems (PPS), facilities to ensure material remains secure in various configurations, and infrastructure to support, maintain, and sustain upgraded sites. Significant effort on the part of both governments has also been expended to ensure thatmore » personnel obtain the necessary skills and training to both operate and maintain the security systems, thereby ensuring long term sustainability. To accomplish this, initial vendor training on physical protection systems was provided to key personnel, and an approved training curriculum was developed to teach the skills of operating, managing, administering, and maintaining the installed physical protection systems. This approach also included documentation of the processes and procedures to support infrastructure, requisite levels of maintenance and testing of systems and equipment, lifecycle management support, inventory systems and spare parts caches. One of the core components in the U.S. exit strategy and full transition to the RF MOD is the development and utilization of regional centers to facilitate centralized training and technical support to upgraded MOD sites in five regions of the RF. To date, two regional centers and one regional classroom facility are functional, and two additional regional centers are currently under construction. This paper will address the process and logistics of regional center establishment and the future vision for integrated regional center support by the RF MOD.« less

  4. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    An American flag flutters in the breeze as NASA’s upgraded crawler-transporter 2 (CT-2) travels along the crawlerway during its trek to Launch Pad 39B at the agency’s Kennedy Space Center in Florida, to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the Vehicle Assembly Building. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  5. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    Technicians walk alongside NASA’s upgraded crawler-transporter 2 (CT-2) as it continues the trek on the crawlerway from the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida to Launch Pad 39B to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the VAB. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  6. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    Technicians walk alongside NASA’s upgraded crawler-transporter 2 (CT-2) as it continues the trek along the crawlerway from the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida to Launch Pad 39B to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the VAB. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  7. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    A truck sprays water in front of NASA’s upgraded crawler-transporter 2 (CT-2) to control dust as it begins the trek from the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida to Launch Pad 39B to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the VAB. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  8. PTC test bed upgrades to provide ACSES testing support capabilities at transportation technology center.

    DOT National Transportation Integrated Search

    2015-06-01

    FRA Task Order 314 upgraded the Positive Train Control (PTC) Test Bed at the Transportation Technology Center to support : testing of PTC systems, components, and related equipment associated with the Advanced Civil Speed Enforcement System : (ACSES)...

  9. Turn Basin Construction

    NASA Image and Video Library

    2017-06-14

    Modifications are underway at the Launch Complex 39 turn basin wharf at NASA's Kennedy Space Center in Florida to prepare for the arrival of the agency's massive Space Launch System (SLS) core stage aboard the barge Pegasus. Equipment is staged and a crane will be used to lift up precast concrete poles and position them to be driven to a depth of about 70 feet into the bedrock below the water around the turn basin. The upgrades are necessary to accommodate the increased weight of the core stage along with ground support and transportation equipment aboard the modified barge Pegasus. The Ground Systems Development and Operations Program is overseeing the upgrades to the turn basin wharf.

  10. Turn Basin Construction

    NASA Image and Video Library

    2017-06-14

    Modifications are underway at the Launch Complex 39 turn basin wharf at NASA's Kennedy Space Center in Florida to prepare for the arrival of the agency's massive Space Launch System (SLS) core stage aboard the barge Pegasus. A crane will be used to lift up precast concrete poles and position them to be driven to a depth of about 70 feet into the bedrock below the water around the turn basin. The upgrades are necessary to accommodate the increased weight of the core stage along with ground support and transportation equipment aboard the modified barge Pegasus. The Ground Systems Development and Operations Program is overseeing the upgrades to the turn basin wharf.

  11. 14 CFR 121.433 - Training required.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... airplane of the same group may serve in the same crewmember capacity upon completion of transition training..., respectively, upon completion of upgrade training for that airplane as provided in § 121.415. (b) Differences... airplane of a type for which differences training is included in the certificate holder's approved training...

  12. MLP-1 on Crawler Transporter 2 (CT-2)

    NASA Image and Video Library

    2017-03-22

    NASA's upgraded crawler-transporter 2 (CT-2), carrying mobile launcher platform 1, moves slowly along the crawlerway at the agency's Kennedy Space Center in Florida. The crawler's upgrades and modifications will be monitored and tested under loaded conditions during its travel to the crawlerway Pad A/B split and back to the crawler yard to confirm it is ready to support the load of the mobile launcher carrying the Space Launch System with Orion atop for the first test flight, Exploration Mission 1. The Ground Systems Development and Operations Program at Kennedy is managing upgrades to the crawler.

  13. USP <800> Adds Significant Safety Standards: Facility Upgrades Needed to Protect Employees From Hazardous Drugs.

    PubMed

    Beans, Bruce E

    2017-05-01

    The new USP standard for handling hazardous drugs (HDs) will require millions of dollars in capital outlays for facility and equipment upgrades and also requires in-depth assessments of each HD that facilities handle, significant workflow and work practice changes, and thorough staff training.

  14. Cooperative Demonstration Program for High Technology Training. Performance Report.

    ERIC Educational Resources Information Center

    Indian Hills Community Coll., Ottumwa, IA.

    A program at Indian Hills Community College (Ottumwa, Iowa) consisted of a sex equity component aimed to prepare women to enter nontraditional occupations and a building trades component to enable electrical workers to upgrade their skills. Both of the targeted groups underwent assessment and upgrading coordinated through the college's SUCCESS…

  15. ML Construction Progress

    NASA Image and Video Library

    2014-12-17

    Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. Scaffolding, or work platforms, have been installed around the base of the tower on the ML to continue upgrades and modifications to the structure. The ML is being modified and strengthened to accommodate the weight, size and thrust at launch of NASA's Space Launch System, or SLS, and Orion spacecraft. The ML is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program at Kennedy. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first uncrewed mission, Exploration Mission-1, in 2018.

  16. GSDO Crawler 2 Refurbishment

    NASA Image and Video Library

    2014-03-18

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a ground support technician assists with removal of bearings from the B truck tread of crawler-transporter 2, or CT-2. New roller bearing assemblies will be installed. Work continues in high bay 2 to upgrade CT-2. The modifications are designed to ensure CT-2’s ability to transport launch vehicles currently in development, such as the agency’s Space Launch System, to the launch pad. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter. Photo credit: NASA/Dimitri Gerondidakis

  17. KSC-2014-2217

    NASA Image and Video Library

    2014-04-17

    CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, ground support technicians prepare for removal of the outboard and inboard sprocket shaft assemblies on the C truck of crawler-transporter 2, or CT-2. A section of the treads on the C truck were removed to allow access to the sprocket assemblies. Work continues in high bay 2 to upgrade CT-2. The modifications are designed to ensure CT-2’s ability to transport launch vehicles currently in development, such as the agency’s Space Launch System, to the launch pad. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter. Photo credit: NASA/Dimitri Gerondidakis

  18. Mobile Telemetry Van Remote Control Upgrade

    DTIC Science & Technology

    2012-05-17

    Advantages of Remote Control System Upgrade • Summary Overview • Remote control of Telemetry Mobile Ground Support ( TMGS ) Van proposed to allow...NWC) personnel provided valuable data for full-function remote control of telemetry tracking vans Background • TMGS Vans support Flight Test...control capability from main TM site at Building 5790 currently allows support via TMGS Van at nearby C- 15 Site, Plant 42 in Palmdale, and as far

  19. Puerto Rico Nursing Career Cooperative Demonstration Program. Final Performance Report.

    ERIC Educational Resources Information Center

    Puerto Rico State Dept. of Education, Hato Rey.

    The Puerto Rico Nursing Career Cooperative Demonstration Project and Associate Nursing Program provided education and onsite occupational training laboratory to upgrade the education of 20 licensed practical nurses (LPNs) from 1989-90. The nurses were upgraded to associate nurses in an 18-month period at the Technological Institute of Puerto Rico.…

  20. A Survey of CETA Upgrading and Retraining Programs.

    ERIC Educational Resources Information Center

    Cambridge Office of Manpower Affairs, MA.

    In 1979, Comprehensive Employment and Training Act (CETA) legislation was changed to remove income from the eligibility criteria for Title IIC upgrading and retraining programs. In order to assess the impact of this change upon CETA prime sponsor and private industry council (PIC) activities across the country, a telephone survey was made to all…

  1. An Evaluation of Washington State's Job Skills Program.

    ERIC Educational Resources Information Center

    Washington State Workforce Training and Education Coordinating Board, Olympia.

    The Job Skills Program (JSP) in Washington State provides job training customized to meet the needs of employers through partnerships of employers and training institutions. The JSP funds up to one-half the cost of training, with employers providing a match. Training can be provided for new employees, for upgrading employees receiving promotions,…

  2. 14 CFR 91.1103 - Pilots: Initial, transition, upgrade, requalification, and differences flight training.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... simulator or training device; and (2) A flight check in the aircraft or a check in the simulator or training..., requalification, and differences flight training. 91.1103 Section 91.1103 Aeronautics and Space FEDERAL AVIATION... OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1103 Pilots: Initial...

  3. 14 CFR 91.1103 - Pilots: Initial, transition, upgrade, requalification, and differences flight training.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... simulator or training device; and (2) A flight check in the aircraft or a check in the simulator or training..., requalification, and differences flight training. 91.1103 Section 91.1103 Aeronautics and Space FEDERAL AVIATION... OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1103 Pilots: Initial...

  4. 14 CFR 91.1103 - Pilots: Initial, transition, upgrade, requalification, and differences flight training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... simulator or training device; and (2) A flight check in the aircraft or a check in the simulator or training..., requalification, and differences flight training. 91.1103 Section 91.1103 Aeronautics and Space FEDERAL AVIATION... OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1103 Pilots: Initial...

  5. 14 CFR 91.1103 - Pilots: Initial, transition, upgrade, requalification, and differences flight training.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... simulator or training device; and (2) A flight check in the aircraft or a check in the simulator or training..., requalification, and differences flight training. 91.1103 Section 91.1103 Aeronautics and Space FEDERAL AVIATION... OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1103 Pilots: Initial...

  6. 14 CFR 91.1103 - Pilots: Initial, transition, upgrade, requalification, and differences flight training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... simulator or training device; and (2) A flight check in the aircraft or a check in the simulator or training..., requalification, and differences flight training. 91.1103 Section 91.1103 Aeronautics and Space FEDERAL AVIATION... OPERATING AND FLIGHT RULES Fractional Ownership Operations Program Management § 91.1103 Pilots: Initial...

  7. Worker Training: Competing in the New International Economy.

    ERIC Educational Resources Information Center

    Congress of the U.S., Washington, DC. Office of Technology Assessment.

    Workers' skills are critical to U.S. industrial productivity and competitiveness and to maintaining living standards. Training is the key. Good training pays--for workers whose skills are upgraded, for companies seeking a competitive edge, and for the nation in overall productivity. However, workers in other countries are better trained than most…

  8. 20 CFR 668.500 - What services may INA grantees provide to or for employers under section 166?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...-employment training; (4) Customized training; (5) On-the-Job training (OJT); (6) Post-employment services, including training and support services to encourage job retention and upgrading; (7) Work experience for... participants, including job restructuring services; (2) Recruitment and assessment of potential employees, with...

  9. Educational Technology Training for Higher Education Teachers in China and Some Suggestions for Improving It

    ERIC Educational Resources Information Center

    Huiyu, Zhang; Yan, Dong; Geng, Chen

    2005-01-01

    This article describes current practices in educational technology training for higher education teachers in China, using information derived from questionnaires and statistics. It addresses problems identified in questionnaires, such as upgrading and improving training content and training modes, and makes some constructive suggestions for the…

  10. MLP-1 on Crawler Transporter 2 (CT-2)

    NASA Image and Video Library

    2017-03-22

    NASA's upgraded crawler-transporter 2 (CT-2), carrying mobile launcher platform 1, moves slowly along the crawlerway toward the Vehicle Assembly Building at the agency's Kennedy Space Center in Florida. The crawler's upgrades and modifications were monitored and tested during a loaded test to the crawlerway Pad A/B split. CT-2 will return to the crawler yard. The crawler is being tested to confirm it is ready to support the load of the mobile launcher carrying the Space Launch System with Orion atop for the first test flight, Exploration Mission 1. The Ground Systems Development and Operations Program at Kennedy is managing upgrades to the crawler.

  11. ML Construction Progress

    NASA Image and Video Library

    2014-12-17

    Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. A crane is being used to move scaffolding, or work platforms, around the base of the tower on the ML to continue upgrades and modifications to the structure. The ML is being modified and strengthened to accommodate the weight, size and thrust at launch of NASA's Space Launch System, or SLS, and Orion spacecraft. The ML is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program at Kennedy. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first uncrewed mission, Exploration Mission-1, in 2018.

  12. Turn Basin Construction

    NASA Image and Video Library

    2017-06-14

    Modifications are underway at the Launch Complex 39 turn basin wharf at NASA's Kennedy Space Center in Florida to prepare for the arrival of the agency's massive Space Launch System (SLS) core stage aboard the barge Pegasus. Tammy Kelly, in the center, site manager, with Southeast Cherokee Construction Inc. talks with construction workers. A crane will be used to lift up precast concrete poles and position them to be driven to a depth of about 70 feet into the bedrock below the water around the turn basin. The upgrades are necessary to accommodate the increased weight of the core stage along with ground support and transportation equipment aboard the modified barge Pegasus. The Ground Systems Development and Operations Program is overseeing the upgrades to the turn basin wharf.

  13. Turn Basin Construction

    NASA Image and Video Library

    2017-06-14

    Modifications are underway at the Launch Complex 39 turn basin wharf at NASA's Kennedy Space Center in Florida to prepare for the arrival of the agency's massive Space Launch System (SLS) core stage aboard the barge Pegasus. In the foreground is Tammy Kelly, site manager, with Southeast Cherokee Construction Inc. A crane will be used to lift up precast concrete poles and position them to be driven to a depth of about 70 feet into the bedrock below the water around the turn basin. The upgrades are necessary to accommodate the increased weight of the core stage along with ground support and transportation equipment aboard the modified barge Pegasus. The Ground Systems Development and Operations Program is overseeing the upgrades to the turn basin wharf.

  14. Pad 39B Flame Trench Upgrades and modifications

    NASA Image and Video Library

    2016-03-03

    Upgrades and modifications continue to the flame trench at Launch Pad 39B at NASA’s Kennedy Space Center in Florida. Pad B is being refurbished to support the launch of NASA’s Space Launch System rocket. The Ground Systems Development and Operations (GSDO) Program at Kennedy is helping transform the space center into a multi-user spaceport and prepare for Exploration Mission-1, deep-space missions, and the journey to Mars.

  15. Project SETT-UP: Special Education via Telecommunications, Teacher Upgrade. Five Year Report, June 1, 1976-August 31, 1981.

    ERIC Educational Resources Information Center

    Curtis, John A.

    The 5 year report on Project SETT-UP (Special Education via Telecommunications--Teacher Upgrade), a two way telecommunications inservice training project in southeastern Virginia, is presented. The report is organized into three sections concerned with personnel involved in the program, achievement of program objectives, and special program…

  16. Investigation of Intra-Firm Upward Mobility among Selected Skilled Craftsmen.

    ERIC Educational Resources Information Center

    Barnes, Clarence Harold

    The objective was to investigate the factors which influence the upward movement of skilled craftsmen within the firm. Particular attention was directed to the importance of apprenticeship training in causing intrafirm upgrading; that is: were apprentice-trained craftsmen more inclined to be promoted than nonapprentice-trained craftsmen. Observed…

  17. Employee Upgrading for a Quality Workforce.

    ERIC Educational Resources Information Center

    Drier, Harry N.; And Others

    This training program is a model for recruiting and training counselors to address the career development and educational planning needs of current employees. Section A is directed to the instructor who will train counselors to provide career development assistance to employees of an organization. It describes the program concept and discusses…

  18. Operation of High Speed Passenger Trains in Rail Freight Corridors

    DOT National Transportation Integrated Search

    1975-09-01

    A preliminary examination of the problems associated with mixed-traffic operations - conventional freight and high speed passenger trains - is presented. Approaches based upon a modest upgrading of existing signal systems are described. Potential cos...

  19. Detroit Pursues Training with a Purpose.

    ERIC Educational Resources Information Center

    Thompson, William B.

    1978-01-01

    This article presents a six-week basic training course implemented in Detroit for operation and maintenance of a newly upgraded wastewater treatment plant. Each phase of the program, including manual preparation and use, is outlined and discussed. (CS)

  20. Human-machine interface (HMI) report for 241-SY-101 data acquisition [and control] system (DACS) upgrade study

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Truitt, R.W.

    1997-10-22

    This report provides an independent evaluation of information for a Windows based Human Machine Interface (HMI) to replace the existing DOS based Iconics HMI currently used in the Data Acquisition and Control System (DACS) used at Tank 241-SY-101. A fundamental reason for this evaluation is because of the difficulty of maintaining the system with obsolete, unsupported software. The DACS uses a software operator interface (Genesis for DOS HMI) that is no longer supported by its manufacturer, Iconics. In addition to its obsolescence, it is complex and difficult to train additional personnel on. The FY 1997 budget allocated $40K for phasemore » 1 of a software/hardware upgrade that would have allowed the old DOS based system to be replaced by a current Windows based system. Unfortunately, budget constraints during FY 1997 has prompted deferral of the upgrade. The upgrade needs to be performed at the earliest possible time, before other failures render the system useless. Once completed, the upgrade could alleviate other concerns: spare pump software may be able to be incorporated into the same software as the existing pump, thereby eliminating the parallel path dilemma; and the newer, less complex software should expedite training of future personnel, and in the process, require that less technical time be required to maintain the system.« less

  1. Crawler Transporter 2 (CT-2) Trek from Pad 39B to VAB

    NASA Image and Video Library

    2017-03-21

    Crawler-transport 2 (CT-2) moves slowly along the crawlerway on its way back to the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The crawler took a trip to the pad A/B split to test upgrades recently completed that will allow the giant vehicle to handle the load of the agency's Space Launch System rocket and Orion spacecraft atop the mobile launcher. The Ground Systems Development and Operations Program oversaw upgrades to the 50-year-old CT-2. New generators, gear assemblies, jacking, equalizing and leveling (JEL) hydraulic cylinders, roller bearings and brakes were installed, and other components were upgraded to prepare for Exploration Mission 1.

  2. Crawler Transporter 2 (CT-2) Trek from Pad 39B to VAB

    NASA Image and Video Library

    2017-03-21

    Crawler-transporter 2 (CT-2) moves slowly along the crawlerway on its way back to the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The crawler took a trip to the Pad A/B split to test upgrades recently completed that will allow the giant vehicle to handle the load of the agency's Space Launch System rocket and Orion spacecraft atop the mobile launcher. The Ground Systems Development and Operations Program oversaw upgrades to the 50-year-old CT-2. New generators, gear assemblies, jacking, equalizing and leveling (JEL) hydraulic cylinders, roller bearings and brakes were installed, and other components were upgraded to prepare for Exploration Mission 1.

  3. Crawler Transporter 2 (CT-2) Trek from Pad 39B to VAB

    NASA Image and Video Library

    2017-03-21

    Crawler-transporter 2 (CT-2) moves slowly along the crawlerway toward the Vehicle Assembly Building (in the background) at NASA's Kennedy Space Center in Florida. The crawler took a trip to the Pad A/B split to test upgrades recently completed that will allow the giant vehicle to handle the load of the agency's Space Launch System rocket and Orion spacecraft atop the mobile launcher. The Ground Systems Development and Operations Program oversaw upgrades to the 50-year-old CT-2. New generators, gear assemblies, jacking, equalizing and leveling (JEL) hydraulic cylinders, roller bearings and brakes were installed, and other components were upgraded to prepare for Exploration Mission 1.

  4. Developing Multimedia Enhanced Content to Upgrade Subject Content Knowledge of Secondary School Teachers in Tanzania

    ERIC Educational Resources Information Center

    Mtebe, Joel S.; Kibga, Elia Y.; Mwambela, Alfred A.; Kissaka, Mussa M.

    2015-01-01

    The failure rates and lack of interest amongst students in science and mathematics in secondary schools in Tanzania is a serious problem. The Ministry of Education and Vocational Training (MoEVT) implemented a project to enhance and upgrade the pedagogical knowledge and subject content knowledge of teachers in selected difficult topics in science…

  5. KSC-2014-1797

    NASA Image and Video Library

    2014-03-18

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, ground support technicians apply heat to a casing that contains an old bearing on the B truck tread of crawler-transporter 2, or CT-2. The bearing will separate and out for removal. New roller bearing assemblies will be installed on CT-2. Work continues in high bay 2 to upgrade CT-2. The modifications are designed to ensure CT-2’s ability to transport launch vehicles currently in development, such as the agency’s Space Launch System, to the launch pad. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter. Photo credit: NASA/Dimitri Gerondidakis

  6. GSDO Crawler Tread Removal

    NASA Image and Video Library

    2014-03-28

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, ground support technicians attach crane lines to the treads on the C truck of crawler-transporter 2, or CT-2, so they can be lifted up and away. The treads are being removed in order to gain access to remove the gear boxes. Work continues in high bay 2 to upgrade CT-2. The modifications are designed to ensure CT-2’s ability to transport launch vehicles currently in development, such as the agency’s Space Launch System, to the launch pad. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter. Photo credit: NASA/Dimitri Gerondidakis

  7. KSC-2014-2214

    NASA Image and Video Library

    2014-04-17

    CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, ground support technicians use a special work stand to guide a roller bearing shaft for insertion on the C truck of crawler-transporter 2, or CT-2. A section of the treads on the C truck were removed to allow access to the bearings. Work continues in high bay 2 to upgrade CT-2. The modifications are designed to ensure CT-2’s ability to transport launch vehicles currently in development, such as the agency’s Space Launch System, to the launch pad. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter. Photo credit: NASA/Dimitri Gerondidakis

  8. KSC-2014-2213

    NASA Image and Video Library

    2014-04-17

    CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, ground support technicians use a special work stand to guide a roller bearing shaft for insertion on the C truck of crawler-transporter 2, or CT-2. A section of the treads on the C truck were removed to allow access to the bearings. Work continues in high bay 2 to upgrade CT-2. The modifications are designed to ensure CT-2’s ability to transport launch vehicles currently in development, such as the agency’s Space Launch System, to the launch pad. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter. Photo credit: NASA/Dimitri Gerondidakis

  9. KSC-2014-2212

    NASA Image and Video Library

    2014-04-17

    CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, ground support technicians attach a roller bearing shaft to a forklift. The bearing is being prepared for insertion in the C truck of crawler-transporter 2, or CT-2. A section of the treads on the C truck were removed to allow access to the bearings. Work continues in high bay 2 to upgrade CT-2. The modifications are designed to ensure CT-2’s ability to transport launch vehicles currently in development, such as the agency’s Space Launch System, to the launch pad. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter. Photo credit: NASA/Dimitri Gerondidakis

  10. Basic Training Program for Emergency Medical Technician Ambulance: Course Guide.

    ERIC Educational Resources Information Center

    Fucigna, Joseph T.; And Others

    In an effort to upgrade or further develop the skills levels of all individuals involved in the emergency medical care service, this training program was developed for the National Highway Safety Bureau. This specific course is an attempt to organize, conduct, and standardize a basic training course for emergency medical technicians (EMTs). The…

  11. 40 CFR 35.935-17 - Training facility.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.935-17 Training facility. If assistance has been provided for the construction of a treatment works required to train and upgrade waste treatment personnel under §§ 35.930-1(b) and 35.920-3(e), the grantee must...

  12. 40 CFR 35.935-17 - Training facility.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... STATE AND LOCAL ASSISTANCE Grants for Construction of Treatment Works-Clean Water Act § 35.935-17 Training facility. If assistance has been provided for the construction of a treatment works required to train and upgrade waste treatment personnel under §§ 35.930-1(b) and 35.920-3(e), the grantee must...

  13. Special Project for Research Training in Vocational Education: Research Training Series. Final Report.

    ERIC Educational Resources Information Center

    Vivian, Neal E.

    To upgrade research and research utilization competence of vocational educators, The Center for Vocational and Technical Education and The American Vocational Association planned four 1-week research training programs on: (1) Planning Vocational/Technical Education Programs Based on Manpower Research, (2) Patterns of Career Development as Applied…

  14. Autonomic Computing for Spacecraft Ground Systems

    NASA Technical Reports Server (NTRS)

    Li, Zhenping; Savkli, Cetin; Jones, Lori

    2007-01-01

    Autonomic computing for spacecraft ground systems increases the system reliability and reduces the cost of spacecraft operations and software maintenance. In this paper, we present an autonomic computing solution for spacecraft ground systems at NASA Goddard Space Flight Center (GSFC), which consists of an open standard for a message oriented architecture referred to as the GMSEC architecture (Goddard Mission Services Evolution Center), and an autonomic computing tool, the Criteria Action Table (CAT). This solution has been used in many upgraded ground systems for NASA 's missions, and provides a framework for developing solutions with higher autonomic maturity.

  15. Magnetic Launch Assist: NASA's Vision for the Future

    NASA Technical Reports Server (NTRS)

    Jacobs, William A.; Montenegro, Justino (Technical Monitor)

    2000-01-01

    With the ever-increasing cost of getting to space and the need for safe, reliable, and inexpensive ways to access space. The National Aeronautics and Space Administration (NASA) is taking a look at technologies that will get us there. One of these technologies is Magnetic Launch Assist (MagLev). This is the concept of using both magnetic levitation and magnetic propulsion to provide an initial velocity by using electrical power from ground sources. The use of ground generated electricity can significantly reduce operational costs over the consumables necessary to attain the same velocity. The technologies to accomplish this are both old and new. The concept of MagLev has been around for a long time and several MagLev Trains have been developed. Where NASA's MagLev diverges from the traditional train is in the immense amount of power required to propel this vehicle to 183 meters per second in less than 10 seconds. New technologies or the upgrade of existing technologies will need to be investigated in the areas of energy storage and power switching. An added difficulty is the separation of a very large mass (the space vehicle) from the track and the aerodynamics of that vehicle while on the track. These are of great concern and require considerable study and testing. NASA's plan is to mature these technologies in the next 25 years to achieve our goal of launching a full sized space vehicle for under $300 a kilogram.

  16. Cryogenic testing of Planck sorption cooler test facility

    NASA Technical Reports Server (NTRS)

    Zhang, B.; Pearson, D.; Borders, J.; Franklin, B.; Prina, M.; Hardy, J.; Crumb, D.

    2004-01-01

    A test facility has been upgraded in preparation for testing of two hydrogen sorption cryocoolers operating at 18/20 K. these sorption coolers are currently under development at the Jet Propulsion Laboratory. This work summarizes the scope of the test facility upgrade, including design for cryogenic cooling power delivery, system thermal management, insulation schemes, and data acquisition techniques. Ground support equipment for the sorption coolers, structural features of the test chamber, and the vacuum system involved for system testing will also be described in detail.

  17. Army Future Combat System (FCS) Spin-Outs and Ground Combat Vehicle (GCV): Background and Issues for Congress

    DTIC Science & Technology

    2009-11-30

    CGV ) .............................................................................7 MGV Cancellation...of developing the CGV concept, states that a “new Ground Combat Vehicle, synchronized with upgrades, reset and divestiture of current vehicles is the...our Army the agility to adapt and versatility to meet the challenges of an ever- changing operational environment.” The CGV concept, in short, is to

  18. The Impact of Collegiate Aviation Student Learning Styles on Flight Performance: A Scenario-Based Training Approach

    ERIC Educational Resources Information Center

    Harriman, Stanley L.

    2011-01-01

    The introduction of the glass cockpit, as well as a whole new generation of high performance general aviation aircraft, highlights the need for a comprehensive overhaul of the traditional approach to training pilots. Collegiate aviation institutions that are interested in upgrading their training aircraft fleets will need to design new curricula…

  19. 14 CFR 121.424 - Pilots: Initial, transition, and upgrade flight training.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... initial flight training that are capable of being performed in an airplane simulator without a visual system; and (ii) A flight check in the simulator or the airplane to the level of proficiency of a pilot... training required by § 121.423 must be performed in a Level C or higher full flight simulator unless the...

  20. Skill Upgrading within Informal Training: Lessons from the Indian Auto Mechanic

    ERIC Educational Resources Information Center

    Barber, Jamie

    2004-01-01

    Informal training is known to be the dominant skill acquisition strategy for the majority of workers in India and many other economically developing countries and there is much benefit in understanding the strengths and weaknesses of this form of training. A participant observation case study was undertaken in northern India to investigate these…

  1. The Training Requirements of the Clothing Industry. A Survey of Selected Occupations.

    ERIC Educational Resources Information Center

    Berry, Kathleen M.; Kuhl, Dean H.

    This survey was conducted in order to determine the training requirements of the clothing industry in South Australia. The results and findings are intended to be used as a means for upgrading and revising the Clothing Production Certificate Course and for providing suitable training programs for other key occupations within the industry. Survey…

  2. An intelligent position-specific training system for mission operations

    NASA Technical Reports Server (NTRS)

    Schneider, M. P.

    1992-01-01

    Marshall Space Flight Center's (MSFC's) payload ground controller training program provides very good generic training; however, ground controller position-specific training can be improved by including position-specific training systems in the training program. This report explains why MSFC needs to improve payload ground controller position-specific training. The report describes a generic syllabus for position-specific training systems, a range of system designs for position-specific training systems, and a generic development process for developing position-specific training systems. The report also describes a position-specific training system prototype that was developed for the crew interface coordinator payload operations control center ground controller position. The report concludes that MSFC can improve the payload ground controller training program by incorporating position-specific training systems for each ground controller position; however, MSFC should not develop position-specific training systems unless payload ground controller position experts will be available to participate in the development process.

  3. Crawler Transporter 2 (CT-2) Trek from Pad 39B to VAB

    NASA Image and Video Library

    2017-03-21

    A full view of crawler-transporter 2 (CT-2) as it moves slowly along the crawlerway on its way back to the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The crawler took a trip to the Pad A/B split to test upgrades recently completed that will allow the giant vehicle to handle the load of the agency's Space Launch System rocket and Orion spacecraft atop the mobile launcher. The Ground Systems Development and Operations Program oversaw upgrades to the 50-year-old CT-2. New generators, gear assemblies, jacking, equalizing and leveling (JEL) hydraulic cylinders, roller bearings and brakes were installed, and other components were upgraded to prepare for Exploration Mission 1.

  4. Team behaviors: working effectively in teams.

    PubMed

    Wilson, C K

    1998-12-01

    The work of building and sustaining teams is often underestimated by middle managers. A manager must have the ability to develop and evolve staff toward a new level of competence, required because of radically upgraded expectations. Managers must be clear about what it means to empower teams, to avoid the trappings of giving "lip service" to authority boundaries, which may exist only on paper. Achieving this clarity means understanding the characteristics of effective teams: a high degree of interdependence, strong sense of organizational empowerment, self-determination, competence, commitment, and genuine concern about the quality of work being performed. An important tool for the manager interested in team development is the creation of a performance model, grounded in the foundational relationship competencies necessary for team success. Performance modeling assists not only in identifying of competency gaps that can be addressed by training but also in determining the workplace barriers to team success.

  5. Robotic acquisition programs: technical and performance challenges

    NASA Astrophysics Data System (ADS)

    Thibadoux, Steven A.

    2002-07-01

    The Unmanned Ground Vehicles/ Systems Joint Project Office (UGV/S JPO) is developing and fielding a variety of tactical robotic systems for the Army and Marine Corps. The Standardized Robotic System (SRS) provides a family of common components that can be installed in existing military vehicles, to allow unmanned operation of the vehicle and its payloads. The Robotic Combat Support System (RCSS) will be a medium sized unmanned system with interchangeable attachments, allowing a remote operator to perform a variety of engineering tasks. The Gladiator Program is a USMC initiative for a small to medium sized, highly mobile UGV to conduct scout/ surveillance missions and to carry various lethal and non-lethal payloads. Acquisition plans for these programs require preplanned evolutionary block upgrades to add operational capability, as new technology becomes available. This paper discusses technical and performance issues that must be resolved and the enabling technologies needed for near term block upgrades of these first generation robotic systems. Additionally, two Joint Robotics Program (JRP) initiatives, Robotic Acquisition through Virtual Environments and Networked Simulations (RAVENS) and Joint Architecture for Unmanned Ground Systems (JAUGS), will be discussed. RAVENS and JAUGS will be used to efficiently evaluate and integrate new technologies to be incorporated in system upgrades.

  6. The Telecommunications and Data Aquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1983-01-01

    Tracking and ground-based navigation techniques are discussed in relation to DSN advanced systems. Network data processing and productivity are studied to improve management planning methods. Project activities for upgrading DSN facilities are presented.

  7. KSC-2013-2892

    NASA Image and Video Library

    2013-06-25

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, technicians position equipment and forklifts as work continues to install new roller shaft bearings in crawler-transporter 2, or CT-2. Work continues in high bay 2 to upgrade CT-2. The modifications are designed to ensure CT-2’s ability to transport launch vehicles currently in development, such as the agency’s Space Launch System, to the launch pad. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings.html. Photo credit: NASA/Jim Grossmann

  8. KSC-2013-3550

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- A technician installs a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  9. KSC-2013-3556

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- A technician completes the installation of a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  10. KSC-2013-3552

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- A technician installs a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  11. KSC-2013-3553

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- Technicians install a new bearing on crawler-transporter 2 in the Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  12. KSC-2013-3555

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- The installation of new bearings on crawler-transporter 2 is underway in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  13. KSC-2013-3549

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- Technicians install a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  14. KSC-2013-3554

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- The installation of new bearings on crawler-transporter 2 is underway in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  15. KSC-2013-3559

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- Steady progress is made on the installation of new bearings on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  16. KSC-2013-3558

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- A technician completes the installation of a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  17. KSC-2013-3557

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- Technicians complete the installation of a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  18. KSC-2013-3551

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- Technicians install a new bearing on crawler-transporter 2 in Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  19. KSC-2013-3548

    NASA Image and Video Library

    2013-09-10

    CAPE CANAVERAL, Fla. -- Preparations are underway to install new bearings on crawler-transporter 2 in the Vehicle Assembly Building High Bay 2 at NASA's Kennedy Space Center in Florida. Modifications underway on the crawler are designed to ensure its ability to transport launch vehicles currently under development, such as the agency’s Space Launch System, to the launch pad. Present modifications represent a redesign and upgrade to the roller bearings and assemblies originally installed on the crawler. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform carrying the Apollo-Saturn V rockets and space shuttles to Launch Pads 39A and 39B. For more information, visit http://www.nasa.gov/exploration/systems/ground/crawler-transporter_bearings_prt.htm. Photo credit: NASA/Kim Shiflett

  20. Preliminary Results from NASA/GSFC Ka-Band High Rate Demonstration for Near-Earth Communications

    NASA Technical Reports Server (NTRS)

    Wong, Yen; Gioannini, Bryan; Bundick, Steven N.; Miller, David T.

    2004-01-01

    In early 2000, the National Aeronautics and Space Administration (NASA) commenced the Ka-Band Transition Project (KaTP) as another step towards satisfying wideband communication requirements of the space research and earth exploration-satellite services. The KaTP team upgraded the ground segment portion of NASA's Space Network (SN) in order to enable high data rate space science and earth science services communications. The SN ground segment is located at the White Sands Complex (WSC) in New Mexico. NASA conducted the SN ground segment upgrades in conjunction with space segment upgrades implemented via the Tracking and Data Relay Satellite (TDRS)-HIJ project. The three new geostationary data relay satellites developed under the TDRS-HIJ project support the use of the inter-satellite service (ISS) allocation in the 25.25-27.5 GHz band (the 26 GHz band) to receive high speed data from low earth-orbiting customer spacecraft. The TDRS H spacecraft (designated TDRS-8) is currently operational at a 171 degrees west longitude. TDRS I and J spacecraft on-orbit testing has been completed. These spacecraft support 650 MHz-wide Ka-band telemetry links that are referred to as return links. The 650 MHz-wide Ka-band telemetry links have the capability to support data rates up to at least 1.2 Gbps. Therefore, the TDRS-HIJ spacecraft will significantly enhance the existing data rate elements of the NASA Space Network that operate at S-band and Ku-band.

  1. Environmental Assessment for Proposed Royal Saudi Air Force F-15SA Beddown at Mountain Home Air Force Base

    DTIC Science & Technology

    2012-08-16

    designed for sophisticated air-to- ground attack capabilities and air-to-air superiority missions, using two crewmembers, a pilot and a weapon systems ...was added to the area of potential ground disturbance. This area comprises a total of 14.08 acres for all projects. As yet undefined infrastructure...upgrades, such as connecting new facilities to water and power systems would also add to the affected areas/ potential area of ground disturbance on

  2. IMPLEMENTING NONPROFESSIONAL PROGRAMS IN HUMAN SERVICES. MANPOWER TRAINING SERIES.

    ERIC Educational Resources Information Center

    SCHMAIS, AARON

    SPECIFIC PROCESSES FOR UTILIZING NONPROFESSIONAL EMPLOYEES IN HUMAN SERVICES ARE PRESENTED. THE BACKGROUND, CURRENT STATUS, AND PROBLEMS ARE DISCUSSED. THE ELEMENTS CONSIDERED ARE RECRUITMENT, SCREENING AND SELECTION, TRAINING, PLACEMENT, SUPERVISION, UPGRADING, AND EVALUATION. EXAMPLES OF NONPROFESSIONAL POSITIONS INCLUDE THE CASE AIDE IN SOCIAL…

  3. Measuring the ability of military aircrews to adapt to perceived stressors when undergoing centrifuge training.

    PubMed

    Wang, Jenhung; Lin, Pei-Chun; Li, Shih-Chin

    2014-01-01

    This study assessed the ability of military aircrews to adapt to stressors when undergoing centrifuge training and determined what equipment items caused perceived stress and needed to be upgraded. We used questionnaires and the Rasch model to measure aircrew personnel's ability to adapt to centrifuge training. The measurement items were ranked by 611 military aircrew personnel. Analytical results indicated that the majority of the stress perceived by aircrew personnel resulted from the lightproof cockpit without outer reference. This study prioritized the equipment requiring updating as the lightproof cockpit design, the dim lighting of the cockpit, and the pedal design. A significant difference was found between pilot and non-pilot subjects' stress from the pedal design; and considerable association was discernible between the seat angle design and flight hours accrued. The study results provide aviators, astronauts, and air forces with reliable information as to which equipment items need to be urgently upgraded as their present physiological and psychological effects can affect the effectiveness of centrifuge training.

  4. Science and Technology Investment Strategy for Squadron Level Training

    DTIC Science & Technology

    1993-05-01

    be derived from empirically sound and theory -based instructional models. Cmment. The automation of instructional design could favorably impact the...require a significant amount of time to develop and where the underlying theory and/or applications hardware and software is ht flux. Long-term efforts...training or training courses. It does not refer to the initial evaluation of individuals entering Upgrade Training ( UGT ). It Am refer to the evaluation of

  5. Upgrading of the LGD cluster at JINR to support DLNP experiments

    NASA Astrophysics Data System (ADS)

    Bednyakov, I. V.; Dolbilov, A. G.; Ivanov, Yu. P.

    2017-01-01

    Since its construction in 2005, the Computing Cluster of the Dzhelepov Laboratory of Nuclear Problems has been mainly used to perform calculations (data analysis, simulation, etc.) for various scientific collaborations in which DLNP scientists take an active part. The Cluster also serves to train specialists. Much has changed in the past decades, and the necessity has arisen to upgrade the cluster, increasing its power and replacing the outdated equipment to maintain its reliability and modernity. In this work we describe the experience of performing this upgrading, which can be helpful for system administrators to put new equipment for clusters of this type into operation quickly and efficiently.

  6. 14 CFR 121.420 - Flight navigators: Initial and transition ground training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ground training. 121.420 Section 121.420 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... § 121.420 Flight navigators: Initial and transition ground training. (a) Initial and transition ground.... (7) Any other instruction as necessary to ensure his competence. (b) Initial ground training for...

  7. 14 CFR 121.420 - Flight navigators: Initial and transition ground training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ground training. 121.420 Section 121.420 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... § 121.420 Flight navigators: Initial and transition ground training. (a) Initial and transition ground.... (7) Any other instruction as necessary to ensure his competence. (b) Initial ground training for...

  8. 14 CFR 121.421 - Flight attendants: Initial and transition ground training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ground training. 121.421 Section 121.421 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... § 121.421 Flight attendants: Initial and transition ground training. (a) Initial and transition ground... equipment and the controls for cabin heat and ventilation. (b) Initial and transition ground training for...

  9. 14 CFR 121.421 - Flight attendants: Initial and transition ground training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ground training. 121.421 Section 121.421 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... § 121.421 Flight attendants: Initial and transition ground training. (a) Initial and transition ground... equipment and the controls for cabin heat and ventilation. (b) Initial and transition ground training for...

  10. KSC-2014-2293

    NASA Image and Video Library

    2014-04-24

    CAPE CANAVERAL, Fla. – Modifications continue on the Multi-Payload Processing Facility, or MPPF, at NASA's Kennedy Space Center in Florida. Inside the high bay, Skip Williams, Ground Systems Development and Operations, or GSDO, deputy project manager for the spacecraft offline element integration team, points out artist illustrations of how the MPPF's interior and exterior will look after modifications and upgrades have been completed. Kennedy's Center Operations Directorate is overseeing upgrades to the MPPF for GSDO Program. The extensive upgrades and modernizations will support processing of Orion spacecraft for NASA's exploration missions. The 19,647-square-foot building, originally constructed in 1995, primarily will be used for Orion hypergolic fueling, ammonia servicing and high-pressure gas servicing and checkout before being transported to the Vehicle Assembly Building for integration with the Space Launch System. Photo credit: NASA/Daniel Casper

  11. Crawler Transporter 2 (CT-2) Trek from Pad 39B to VAB

    NASA Image and Video Library

    2017-03-21

    Crawler-transporter 2 (CT-2) moves slowly along the crawlerway on its way back to the Vehicle Assembly Building (in view in the background) at NASA's Kennedy Space Center in Florida. Water sprayed by a truck in front to reduce dust creates a small rainbow. The crawler took a trip to the Pad A/B split to test upgrades recently completed that will allow the giant vehicle to handle the load of the agency's Space Launch System rocket and Orion spacecraft atop the mobile launcher. The Ground Systems Development and Operations Program oversaw upgrades to the 50-year-old CT-2. New generators, gear assemblies, jacking, equalizing and leveling (JEL) hydraulic cylinders, roller bearings and brakes were installed, and other components were upgraded to prepare for Exploration Mission 1.

  12. Sexual Harassment in the Federal Workplace.

    ERIC Educational Resources Information Center

    Newman, Meredith A.; Jackson, Robert A.; Baker, Douglas D.

    2003-01-01

    Data from the U.S. Merit Systems Protection Board (n=8,081) determined that worker characteristics (age, marital status, employment status) are the principal influence on the likelihood that workers will be sexually harassed. Those most likely also perceive training to be ineffective. Training programs must be reevaluated and upgraded. (Contains…

  13. Strategies for Meeting Correctional Training and Manpower Needs, Four Developmental Projects.

    ERIC Educational Resources Information Center

    Law Enforcement Assistance Administration (Dept. of Justice), Washington, DC.

    The Law Enforcement Education Act of 1965 has placed special emphasis on projects involving training and utilization of correctional manpower. The four representative projects reported here give a comprehensive view of the problems of upgrading correctional staff and possible solutions to those problems: (1) "The Developmental Laboratory for…

  14. 78 FR 41039 - 36(b)(1) Arms Sales Notification

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ... under Consideration for Purchase: follow-on equipment and support for Finland's F-18 Mid-Life Upgrade..., publications and technical documentation, personnel training and training equipment, U.S. Government and...) Military Department: Navy (GAU) (v) Prior Related Cases: FMS case SAA--$2.4 billion--9Jun92 FMS case SAB...

  15. The Waiter and Waitress Training Manual. Revised Edition.

    ERIC Educational Resources Information Center

    Mitchell, Barbara J.

    This manual is intended for use in pre-employment or upgrading training programs for persons who are planning to work or are presently working in the hotel and restaurant food service industry. Eleven chapters cover interpersonal relationships with employers, fellow employees, and customers; grooming and personal hygiene; sanitary food handling;…

  16. New Careers, A Basic Strategy Against Poverty.

    ERIC Educational Resources Information Center

    Riessman, Frank

    The New Careers concept involves helping the disadvantaged to help themselves by offering them entry level jobs with the opportunity for training and advancement. New Careers provides the means to upgrade from entry level to professional occupations, with time made available during the work day for the education and training necessary for…

  17. 14 CFR 135.349 - Flight attendants: Initial and transition ground training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... ground training. 135.349 Section 135.349 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... ON BOARD SUCH AIRCRAFT Training § 135.349 Flight attendants: Initial and transition ground training. Initial and transition ground training for flight attendants must include instruction in at least the...

  18. 14 CFR 135.349 - Flight attendants: Initial and transition ground training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ground training. 135.349 Section 135.349 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... ON BOARD SUCH AIRCRAFT Training § 135.349 Flight attendants: Initial and transition ground training. Initial and transition ground training for flight attendants must include instruction in at least the...

  19. 47 CFR 27.1164 - The cost-sharing formula.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... control equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs... plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. Increased recurring costs...

  20. 47 CFR 27.1164 - The cost-sharing formula.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... control equipment; engineering costs (design/path survey); installation; systems testing; FCC filing costs... plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. Increased recurring costs...

  1. KSC-2014-1951

    NASA Image and Video Library

    2014-04-01

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, preparations are underway to remove the gear boxes on the C truck of crawler-transporter 2, or CT-2. A section of the treads were removed to allow access to the gear boxes. Work continues in high bay 2 to upgrade CT-2. The modifications are designed to ensure CT-2’s ability to transport launch vehicles currently in development, such as the agency’s Space Launch System, to the launch pad. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter. Photo credit: NASA/Cory Huston

  2. GSDO Crawler Tread Removal

    NASA Image and Video Library

    2014-03-28

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, a portion of the treads on the C truck of crawler-transporter 2, or CT-2, have been removed from the vehicle. The treads are being removed in order to gain access to remove the gear boxes. Work continues in high bay 2 to upgrade CT-2. The modifications are designed to ensure CT-2’s ability to transport launch vehicles currently in development, such as the agency’s Space Launch System, to the launch pad. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter. Photo credit: NASA/Dimitri Gerondidakis

  3. KSC-2014-1801

    NASA Image and Video Library

    2014-03-18

    CAPE CANAVERAL, Fla. – Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, an old bearing has been removed from the B truck tread of crawler-transporter 2, or CT-2, and loaded onto a forklift for disposal. New roller bearing assemblies will be installed. Work continues in high bay 2 to upgrade CT-2. The modifications are designed to ensure CT-2’s ability to transport launch vehicles currently in development, such as the agency’s Space Launch System, to the launch pad. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter. Photo credit: NASA/Dimitri Gerondidakis

  4. Analysis of STAT laboratory turnaround times before and after conversion of the hospital information system.

    PubMed

    Lowe, Gary R; Griffin, Yolanda; Hart, Michael D

    2014-08-01

    Modern electronic health record systems (EHRS) reportedly offer advantages including improved quality, error prevention, cost reduction, and increased efficiency. This project reviewed the impact on specimen turnaround times (TAT) and percent compliance for specimens processed in a STAT laboratory after implementation of an upgraded EHRS. Before EHRS implementation, laboratory personnel received instruction and training for specimen processing. One laboratory member per shift received additional training. TAT and percent compliance data sampling occurred 4 times monthly for 13 months post-conversion and were compared with the mean of data collected for 3 months pre-conversion. Percent compliance was gauged using a benchmark of reporting 95% of all specimens within 7 min from receipt. Control charts were constructed for TAT and percent compliance with control limits set at 2 SD and applied continuously through the data collection period. TAT recovered to pre-conversion levels by the 6th month post-conversion. Percent compliance consistently returned to pre-conversion levels by the 10th month post-conversion. Statistical analyses revealed the TAT were significantly longer for 3 months post-conversion (P < .001) compared with pre-conversion levels. Statistical significance was not observed for subsequent groups. Percent compliance results were significantly lower for 6 months post-conversion (P < .001). Statistical significance was not observed for subsequent groups. Extensive efforts were made to train and prepare personnel for challenges expected after the EHRS upgrade. Specific causes identified with the upgraded EHRS included multiple issues involving personnel and the EHRS. These data suggest that system and user issues contributed to delays in returning to pre-conversion TAT and percent compliance levels following the upgrade in the EHRS.

  5. Teacher training: the quick fix that stuck.

    PubMed

    Coldevin, G

    1988-01-01

    Of all the strategies for coping with teacher shortages that have been attempted, the effort that has gained the most ground in the past 20 years involves recruiting untrained or unqualified teachers pressing them into service, and then bringing them up to pedagogical or academic certification through distance education. The benefits of this approach include: for teachers, home-based study means attaining professional certification or academic upgrading without interrupting earnings; in-service training obviates the problem of finding substitute teachers who may have poorer qualifications than the teachers they are replacing; in-situ training reduces the possibility of urban migration that may result when college-based trainees do not want to return to their rural posts; and larger numbers of teachers can be served at 1 time and at lower costs than with campus-based instruction. According to the available studies, training costs for distance education students are typically 1/4 to 1/2 as expensive as conventional instruction. At least 50 3rd world countries are estimated to be involved in some form of distance teacher training. Mostly, countries combine correspondence with broadcasting and other support media, correspondence with occasional face-to-face sessions, and the 3-way combination of print/broadcasting/occasional residential teaching approaches. The broadcast medium typically is radio, but some programs, particularly programs offered by distance education universities, use television also. Tutorial counseling and local resource center support vary considerably and represent the most pressing challenges to the bulk of operations. 4 systems initiated during the 1980s in Pakistan, Burma, Zimbabwe, and Kenya are presented to illustrate the need for distance education training and the diversity of distance education methods.

  6. Capability 9.4 Servicing

    NASA Technical Reports Server (NTRS)

    Moe, Rud

    2005-01-01

    This paper presents viewgraphs on capability structure 9.4 servicing. The topics include: 1) Servicing Description; 2) Benefits of Servicing; 3) Drivers & Assumptions for Servicing; 4) Capability Breakdown Structure 9.4 Servicing; 5) Roadmap for Servicing; 6) 9.4 Servicing Critical Gaps; 7) Capability 9.4 Servicing; 8) Capability 9.4.1 Inspection; 9) State-of-the-Art /Maturity Level /Capabilities for 9.4.1 Inspection; 10) Capability 9.4.2 Diagnostics; 11) State-of-the-Art/Maturity Level /Capabilities for 9.4.2 Diagnostics; 12) Capability 9.4.3 Perform Planned Maintenance; 13) State-of-the-Art /Maturity Level /Capabilities for 9.4.3 Perform Planned Maintenance; 14) Capability 9.4.4 Perform Unplanned Repair; 15) State-of-the-Art /Maturity Level /Capabilities for 9.4.4 Perform Unplanned Repair; 16) Capability 9.4.5 Install Upgrade; 17) Capability 9.4.5 Install Upgrade; 18) State-of-the-Art /Maturity Level /Capabilities for 9.4.5 Install Upgrade; 19) Capability 9.4.6 Planning, Logistics, Training; and 20) State-of-the-Art /Maturity Level /Capabilities for 9.4.6 Planning, Logistics, & Training;

  7. 14 CFR 1251.200 - Discrimination prohibited.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ...) Recruitment, advertising, and the processing of applications for employment; (2) Hiring, upgrading, promotion... absence to pursue training; (8) Employer sponsored activities, including those that are social or...

  8. 45 CFR 84.11 - Discrimination prohibited.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Recruitment, advertising, and the processing of applications for employment; (2) Hiring, upgrading, promotion... absence to pursue training; (8) Employer sponsored activities, including those that are social or...

  9. 43 CFR 17.210 - Employment practices.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Recruitment, advertising, and the processing of applications for employment; (2) Hiring, upgrading, promotion... absence to pursue training; (8) Employer-sponsored activities, including those that are social or...

  10. Robonaut 2 - Building a Robot on the International Space Station

    NASA Technical Reports Server (NTRS)

    Diftler, Myron; Badger, Julia; Joyce, Charles; Potter, Elliott; Pike, Leah

    2015-01-01

    In 2010, the Robonaut Project embarked on a multi-phase mission to perform technology demonstrations on-board the International Space Station (ISS), showcasing state of the art robotics technologies through the use of Robonaut 2 (R2). This phased approach implements a strategy that allows for the use of ISS as a test bed during early development to both demonstrate capability and test technology while still making advancements in the earth based laboratories for future testing and operations in space. While R2 was performing experimental trials onboard the ISS during the first phase, engineers were actively designing for Phase 2, Intra-Vehicular Activity (IVA) Mobility, that utilizes a set of zero-g climbing legs outfitted with grippers to grasp handrails and seat tracks. In addition to affixing the new climbing legs to the existing R2 torso, it became clear that upgrades to the torso to both physically accommodate the climbing legs and to expand processing power and capabilities of the robot were required. In addition to these upgrades, a new safety architecture was also implemented in order to account for the expanded capabilities of the robot. The IVA climbing legs not only needed to attach structurally to the R2 torso on ISS, but also required power and data connections that did not exist in the upper body. The climbing legs were outfitted with a blind mate adapter and coarse alignment guides for easy installation, but the upper body required extensive rewiring to accommodate the power and data connections. This was achieved by mounting a custom adapter plate to the torso and routing the additional wiring through the waist joint to connect to the new set of processors. In addition to the power and data channels, the integrated unit also required updated electronics boards, additional sensors and updated processors to accommodate a new operating system, software platform, and custom control system. In order to perform the unprecedented task of building a robot in space, extensive practice sessions and meticulous procedures were required. Since crew training time is at a premium, the R2 team took a skills-based training approach to ensure the astronauts were proficient with a basic skill set while refining the detailed procedures over several practice sessions and simulations. In addition to the crew activities, meticulous ground procedures were required in order to upgrade firmware on the upper body motor drivers. The new firmware for the IVA mobility unit needed to be deployed using the old software system. This also provided an opportunity to upgrade the upper body joints with new software and allowed for limited insight into the success of the updates. Complete verification that the updated firmware was successfully loaded was not confirmed until the rewiring of the upper body torso was complete.

  11. GSFC preferred parts lists PPL-17

    NASA Technical Reports Server (NTRS)

    Baldini, B. P. (Editor)

    1984-01-01

    A listing of preferred parts, part upgrading procedures, part derating guidelines, and part screening procedures to be used in the selection, procurement, and application of parts for Goddard Space Flight Center (GSFC) space systems and ground support equipment is contained.

  12. 47 CFR 24.243 - The cost-sharing formula.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...

  13. 47 CFR 24.243 - The cost-sharing formula.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...

  14. 47 CFR 24.243 - The cost-sharing formula.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...

  15. 47 CFR 24.243 - The cost-sharing formula.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...; monitoring or control equipment; engineering costs (design/path survey); installation; systems testing; FCC... control; power plant upgrade (if required); electrical grounding systems; Heating Ventilation and Air Conditioning (HVAC) (if required); alternate transport equipment; and leased facilities. C also includes...

  16. Eastern Airlines LOFT program

    NASA Technical Reports Server (NTRS)

    Beach, B. E.

    1981-01-01

    Beginning with scenario design and development issues, Eastern Airlines committed itself to the full four-hour LOFT training format without the additional time for specific maneuvers. Abnormals and emergency conditions, pacing, and quiet periods are included in the scenarios which are written for the instructor to follow verbatim. Simulator capabilities, performance assessment; training vs. checking; crew composition and scheduling; satisfactory completion; the use of video performance printouts; the number of instructors; instructor training and standardization; and initial, transition, and upgrade training are discussed.

  17. A Study of the Pedagogical and Technological Training Needs of Northeast Ohio Vocational Educators.

    ERIC Educational Resources Information Center

    Burrell, Lewis P.

    A Pedagogical and Technological Survey Instrument (PTSI) was administered to determine whether an inservice training need existed for upgrading and modernization of vocational educators in the vocational pedagogical and technological service areas. The PTSI was mailed to 120 individuals with district program responsibilities; 83 responded.…

  18. AUTOMOTIVE DIESEL MAINTENANCE 2. UNIT I, UNDERSTANDING MECHANICAL CLUTCHES.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Education, St. Paul. Div. of Vocational and Technical Education.

    ONE OF A 25-MODULE COURSE DESIGNED TO UPGRADE THE JOB SKILLS AND TECHNICAL KNOWLEDGE OF DIESEL MAINENANCE MECHANICS THIS MATERIAL WAS DEVELOPED BY INDUSTRIAL TRAINING AND SUBJECT-MATTER SPECIALISTS AND TESTED IN INDUSTRIAL TRAINING SITUATIONS. THE PURPOSE OF THIS FIRST UNIT IS TO DEVELOP AN UNDERSTANDING OF COMPONENTS, OPERATION, AND ADJUSTMENTS…

  19. Design & Delivery of Training for a State-Wide Data Communication Network.

    ERIC Educational Resources Information Center

    Zacher, Candace M.

    This report describes the process of development of training for agricultural research, teaching, and extension professionals in how to use the Fast Agricultural Communications Terminal (FACTS) computer network at Purdue University (Indiana), which is currently being upgraded in order to utilize the latest computer technology. The FACTS system is…

  20. A Suggested In-Service Training Model Based on Turkish Preschool Teachers' Conceptions for Sustainable Development

    ERIC Educational Resources Information Center

    Kabadayi, Abdulkadir

    2016-01-01

    Nowadays, teacher professionalization has been upgrading and the status, training and working conditions of teachers have received a great deal of interest for sustainable education. It is recognized that if teachers are equipped with adequate professional knowledge and personal practical knowledge, they will become active curriculum planners at…

  1. What Is a Day's Work? A Personnel Practices Guide for Household Employees and Employers.

    ERIC Educational Resources Information Center

    Bowen, Uvelia S. A.

    The guide presents the policies of the Household Employment Association for Reevaluation and Training (HEART) for upgrading the status of household employment. An overview is given of the association's methods of recruitment, training (in its licensed, private trade school), community education, job development, and post-placement counseling. The…

  2. Computer Managed Instruction at Arthur Andersen & Company: A Status Report.

    ERIC Educational Resources Information Center

    Dennis, Verl E.; Gruner, Dennis

    1992-01-01

    Computer managed instruction (CMI) based on the principle of mastery learning has been cost effective for job training in the tax division of Arthur Andersen & Company. The CMI software system, which uses computerized pretests and posttests to monitor training, has been upgraded from microcomputer use to local area networks. Success factors at…

  3. Developing a Comprehensive and Articulated Nuclear Training Curriculum--The Westinghouse Model.

    ERIC Educational Resources Information Center

    Widen, William C.

    After conducting a comprehensive evaluation of its curriculum, staff at the Westinghouse Nuclear Training Center in Zion, Illinois, undertook a research and development project aimed at upgrading the center's curriculum to the competency-based format. Included among the main activities of the curriculum development process were the following:…

  4. Space Station Upgrades Continue on This Week @NASA – March 31, 2017

    NASA Image and Video Library

    2017-03-31

    Work continues aboard the International Space Station on upgrades to prepare it for future operational activities. Ground controllers, using the station’s robotic arm, moved the Pressurized Mating Adapter-3 (PMA-3) from the Tranquility module to the station’s Harmony module March 26. PMA-3 will be outfitted with one of two International Docking Adapters to accommodate U.S. commercial spacecraft carrying astronauts on future missions. Four days after the PMA-3 move, NASA’s Shane Kimbrough and Peggy Whitson conducted the second in a series of three planned spacewalks to complete work related to the upgrades. The third spacewalk is planned in April. Also, James Webb Space Telescope Completes Acoustic and Vibration Tests, MAVEN Data Helps Measure Loss of Mars’ Atmosphere, Getting Excited About STEM, and New NASA App for Amazon Fire TV!

  5. 14 CFR 91.1105 - Flight attendants: Initial and transition ground training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Flight attendants: Initial and transition ground training. 91.1105 Section 91.1105 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... transition ground training. Initial and transition ground training for flight attendants must include...

  6. 14 CFR 91.1105 - Flight attendants: Initial and transition ground training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Flight attendants: Initial and transition ground training. 91.1105 Section 91.1105 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... transition ground training. Initial and transition ground training for flight attendants must include...

  7. 40 CFR 35.2152 - Federal share.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... a primary, secondary, or advanced treatment facility or its interceptors, or infiltration/inflow... works required to train and upgrade waste treatment works operations and maintenance personnel may be up...

  8. 40 CFR 35.2152 - Federal share.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... a primary, secondary, or advanced treatment facility or its interceptors, or infiltration/inflow... works required to train and upgrade waste treatment works operations and maintenance personnel may be up...

  9. Development of an advanced Two-Micron triple-pulse IPDA lidar for carbon dioxide and water vapor measurements

    NASA Astrophysics Data System (ADS)

    Petros, Mulugeta; Refaat, Tamer F.; Singh, Upendra N.; Yu, Jirong; Antill, Charles; Remus, Ruben; Taylor, Bryant D.; Wong, Teh-Hwa; Reithmaier, Karl; Lee, Jane; Ismail, Syed; Davis, Kenneth J.

    2018-04-01

    An advanced airborne triple-pulse 2-μm integrated path differential absorption (IPDA) lidar is under development at NASA Langley Research Center that targets both carbon dioxide (CO2) and water vapor (H2O) measurements simultaneously and independently. This lidar is an upgrade to the successfully demonstrated CO2 2-μm double-pulse IPDA. Upgrades include high-energy, highrepetition rate 2-μm triple-pulse laser transmitter, innovative wavelength control and advanced HgCdTe (MCT) electron-initiated avalanche photodiode detection system. Ground testing and airborne validation plans are presented.

  10. Turn Basin Construction

    NASA Image and Video Library

    2017-06-14

    Modifications are underway at the Launch Complex 39 turn basin wharf at NASA's Kennedy Space Center in Florida to prepare for the arrival of the agency's massive Space Launch System (SLS) core stage aboard the barge Pegasus. A crane will be used to lift up precast concrete poles and position them to be driven to a depth of about 70 feet into the bedrock below the water around the turn basin. The upgrades are necessary to accommodate the 300,000-pound core booster aboard the modified Pegasus barge. The Ground Systems Development and Operations Program is overseeing the upgrades to the turn basin wharf.

  11. 14 CFR 141.81 - Ground training.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Ground training. 141.81 Section 141.81... OTHER CERTIFICATED AGENCIES PILOT SCHOOLS Operating Rules § 141.81 Ground training. (a) Except as provided in paragraph (b) of this section, each instructor who is assigned to a ground training course must...

  12. 14 CFR 141.81 - Ground training.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Ground training. 141.81 Section 141.81... OTHER CERTIFICATED AGENCIES PILOT SCHOOLS Operating Rules § 141.81 Ground training. (a) Except as provided in paragraph (b) of this section, each instructor who is assigned to a ground training course must...

  13. Current training: Where are we?

    NASA Technical Reports Server (NTRS)

    Golden, Gerald

    1992-01-01

    Petroleum Helicopters, Inc. maintains a staff of 750 helicopter pilots. The initial, transition, upgrade, and recurrent training for these pilots requires a significant financial outlay. Since a major portion of that training is done to satisfy the requirements of FAR 61.57, 'Recent Flight Experience, Pilot in Command' and 135.297, 'Pilot in Command: Instrument Proficiency Check Requirements', much could be accomplished using an approved simulator. However, it is imperative that credit be given for training time spent in the simulators and that the device be realistic, practical, and affordable.

  14. Optics education for machine operators in the semiconductor industry: moving beyond button pushing

    NASA Astrophysics Data System (ADS)

    Karakekes, Meg; Currier, Deborah

    1995-10-01

    In the competitive semiconductor manufacturing industry, employees who operate equipment are able to make greater contributions if they understand how the equipment works. By understanding the 'why' behind the 'what', the equipment operators can better partner with other technical staff to produce quality integrated circuits efficiently and effectively. This additional knowledge also opens equipment operators to job enrichment and enlargement opportunities. Advanced Micro Devices (AMD) is in the process of upgrading the skills of its equipment operators. This paper is an overview of a pilot program that employs optics education to upgrade stepper operators' skills. The paper starts with stepper tasks that require optics knowledge, examines teaching methods, reports both end-of-course and three months post-training knowledge retention, and summarizes how the training has impacted the production floor.

  15. Emergency medicine and the airline passenger

    NASA Technical Reports Server (NTRS)

    Mohler, S. R.; Nicogossian, A.; Margulies, R. A.

    1980-01-01

    Problems related to immediate medical care in case of in-flight emergencies are discussed with reference to such critical types of medical emergencies as obstructed airway, cardiac dysfunction, trauma, hemorrhage, hypoxia, and pain. It is shown that training flight attendants to deal with in-flight medical emergencies and to use first-aid support equipment and essential and useful drugs may later help with stabilization of a victim and allow continuing the flight to the scheduled destination without the need for a diverted landing. Among the steps suggested in order to upgrade inflight welfare and safety of passengers are the development of an advisory circular by the FAA covering standardized training for flight attendants, regulatory action requiring upgrading of the present rudimentary first-aid kit, and the enactment of Good Samaritan legislation by the U.S. Government.

  16. A Distance Blended Learning Program to Upgrade the Clinical Competence of District Non-doctor Anesthesia Providers in Nepal.

    PubMed

    Shah, Shristi; Knoble, Stephen; Ross, Oliver; Pickering, Stephen

    2017-12-01

    Across Nepal, anesthesia at a district level is provided mostly by non-doctor anesthesia providers (anesthesia assistants-AAs). Nepal's Government recognized the need to sustain competence with continuous professional development and to upgrade 6-month trained working AAs to professional equivalence with the new national standard of 12-month training. As they are essential district health workers and AA clinical training sites are full, an innovative distance blended learning, competency-based, upgrade 1-year course was developed and conducted in 2014-2017 for two batches. The course content was developed over 18 months by a team of Nepali and overseas AA training experts. The 1-year course started with a refresher course, continued with tablet-based 12-month self-learning modules and clinical case logs, regular educational mentor communication, midcourse 2-week contact time in an AA training site, regular text messaging and ended with clinical examination and multiple-choice questions. Tablet content included 168 new case studies, pre- and posttests, video lectures, matching exercises and a resource library. All module work and logged clinical cases were uploaded centrally, where clinical mentors were able to review work. Clinical skills were upgraded, as needed, through direct clinical contact midway through the course. Quantitative and qualitative course assessments were included. Fourteen working AAs in first batch and eight working AAs in second batch from district, zonal and mission hospitals across Nepal were enrolled. All remained working at their hospitals throughout the course, and there were no significant tablet problems inhibiting course completion. Twenty-one AAs completed all modules successfully with time required for module completion averaging 19.2 h (range 11.2-32). One AA left the course after 3 months with a personal problem. Subjectively, AAs felt that the obstetric and pediatric modules were more difficult; lowest marks were objectively seen in the airway module. Clinical mentors averaged 8.2 h mentoring review work per module with direct student communication of 2.9 h per module per month. Participants logged a total of 5473 clinical cases, ranging between 50 and 788 cases each. Complications were recorded; outcomes were good. Challenges were the national IT infrastructure making data synchronization difficult and the lack of clinical exposure at some AA's hospitals. Nineteen AAs attended the final examination, and all passed. Two AAs withdrew before the final examination period due to personal and logistic reasons. This is the first use of distance blended learning to upgrade district health workers in Nepal and perhaps for non-doctor anesthesia providers globally. Key success factors were motivated students, cultural and contextualized clinical content, good educational mentoring relationships with regular communication, central IT and motivational support, and face-to-face midcourse clinical contact time.

  17. Safety in airplane flight

    NASA Technical Reports Server (NTRS)

    Brunat, H

    1927-01-01

    This report presents methods to reduce the incidence of aviation accidents. Some of the methods discussed include enlistment and training of aviators, improvement of controls and control surfaces, and upgrading of power plants.

  18. 3D vision upgrade kit for the TALON robot system

    NASA Astrophysics Data System (ADS)

    Bodenhamer, Andrew; Pettijohn, Bradley; Pezzaniti, J. Larry; Edmondson, Richard; Vaden, Justin; Hyatt, Brian; Morris, James; Chenault, David; Tchon, Joe; Barnidge, Tracy; Kaufman, Seth; Kingston, David; Newell, Scott

    2010-02-01

    In September 2009 the Fort Leonard Wood Field Element of the US Army Research Laboratory - Human Research and Engineering Directorate, in conjunction with Polaris Sensor Technologies and Concurrent Technologies Corporation, evaluated the objective performance benefits of Polaris' 3D vision upgrade kit for the TALON small unmanned ground vehicle (SUGV). This upgrade kit is a field-upgradable set of two stereo-cameras and a flat panel display, using only standard hardware, data and electrical connections existing on the TALON robot. Using both the 3D vision system and a standard 2D camera and display, ten active-duty Army Soldiers completed seven scenarios designed to be representative of missions performed by military SUGV operators. Mission time savings (6.5% to 32%) were found for six of the seven scenarios when using the 3D vision system. Operators were not only able to complete tasks quicker but, for six of seven scenarios, made fewer mistakes in their task execution. Subjective Soldier feedback was overwhelmingly in support of pursuing 3D vision systems, such as the one evaluated, for fielding to combat units.

  19. Towards a resilience management framework for complex enterprise systems upgrade implementation

    NASA Astrophysics Data System (ADS)

    Teoh, Say Yen; Yeoh, William; Zadeh, Hossein Seif

    2017-05-01

    The lack of knowledge of how resilience management supports enterprise system (ES) projects accounts for the failure of firms to leverage their investments in costly ES implementations. Using a structured-pragmatic-situational (SPS) case study research approach, this paper reports on an investigation into the resilience management of a large utility company as it implemented an ES upgrade. Drawing on the literature and on the case study findings, we developed a process-based resilience management framework that involves three strategies (developing situation awareness, demystifying threats, and executing restoration plans) and four organisational capabilities that transform resilience management concepts into practices. We identified the crucial phases of ES upgrade implementation and developed indicators for how different strategies and capabilities of resilience management can assist managers at different stages of an ES upgrade. This research advances the state of existing knowledge by providing specific and verifiable propositions for attaining a state of resilience, the knowledge being grounded in the empirical reality of a case study. Moreover, the framework offers ES practitioners a roadmap to better identify appropriate responses and levels of preparedness.

  20. 14 CFR 1201.200 - General.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 5 2011-01-01 2010-01-01 true General. 1201.200 Section 1201.200... assignments; maintains and upgrades the design of ground and flight systems throughout the operational period... computational and experimental fluid dynamics and aerodynamics; fluid and thermal physics; rotorcraft, powered...

  1. Pawcatuck School.

    ERIC Educational Resources Information Center

    Randall, Kathleen

    1993-01-01

    Describes how renovation can transform a school to a state-of-the-art facility without having to work from the ground up. Examined are the planning and design phases, the outer structure upgrading, the installation of more efficient heating, ventilation, and air conditioning systems, and renovation costs. (GR)

  2. Heavy Equipment Operation Curriculum for Grades 11-12.

    ERIC Educational Resources Information Center

    Gubbins Associates, Hadlyme, CT.

    This curriculum for the training of students in grades 11 and 12 is intended to provide a program of instruction in the operation and maintenance of heavy equipment for construction work and farms. It is also suitable for the training of adult learners interested in upgrading their skills or improving their opportunities to enter this labor…

  3. AUTOMOTIVE DIESEL MAINTENANCE 1. UNIT I, GENERAL INTRODUCTION TO DIESEL ENGINES.

    ERIC Educational Resources Information Center

    Human Engineering Inst., Cleveland, OH.

    ONE OF A 30-MODULE COURSE DESIGNED TO UPGRADE THE JOB SKILLS AND TECHNICAL KNOWLEDGE OF DIESEL MAINTENANCE MECHANICS, THIS MATERIAL WAS DEVELOPED BY INDUSTRIAL TRAINING AND SUBJECT-MATTER SPECIALISTS AND TESTED IN INDUSTRIAL TRAINING SITUATIONS. THE PURPOSE OF THIS FIRST UNIT IS TO PROVIDE AN INTRODUCTION TO DIESEL ENGINES BY DEVELOPING AN…

  4. Provision of In-Service Training of Mathematics and Science Teachers in Botswana: Teachers' Perspectives

    ERIC Educational Resources Information Center

    Ramatlapana, Kim Agatha

    2009-01-01

    Teaching is a field that is dynamic, with innovations necessitating upgrading of skills and education of teachers for the successful implementation of reforms. The behaviour and attitudes of teachers towards teaching and learning and their knowledge banks are the result of the impact of in-service training. This study investigated the perceptions…

  5. Upgrading Licensed Practical Nurse to Registered Nurse Program, September 1971 - June 1973. Report.

    ERIC Educational Resources Information Center

    Holloway, Sally

    Twenty Licensed Practical Nurses (LPN) became Registered Nurses (RN) in a pilot program giving partial academic credit for their LPN training and building on their existing skills. The program revolved around three needs: (1) trained nurses; (2) eliminating the notion that jobs were dead-end; and (3) achieving upward mobility for hospital staff.…

  6. Upgrade and interpersonal skills training at American Airlines

    NASA Technical Reports Server (NTRS)

    Estridge, W. W.; Mansfield, J. L.

    1980-01-01

    Segments of the interpersonal skills training audio visual program are presented. The program was developed to train customer contact personnel with specific emphasis on transactional analysis in customer treatment. Concepts of transactional analysis are summarized in terms of the make up of the personality, identified as the three ego states. These ego states are identified as the parent, the adult, and the child. Synopses of four of the tape programs are given.

  7. Prior Learning Assessment in Canada: A Credit to Workforce Development.

    ERIC Educational Resources Information Center

    Burke, Roberta; Van Kleef, Joy

    1997-01-01

    Describes the implementation of Prior Learning Assessment (PLA) at many educational institutions across Canada. Suggests that PLA should be incorporated into every skills training and upgrading program. (JOW)

  8. Computer 3D site model generation based on aerial images

    NASA Astrophysics Data System (ADS)

    Zheltov, Sergey Y.; Blokhinov, Yuri B.; Stepanov, Alexander A.; Skryabin, Sergei V.; Sibiriakov, Alexandre V.

    1997-07-01

    The technology for 3D model design of real world scenes and its photorealistic rendering are current topics of investigation. Development of such technology is very attractive to implement in vast varieties of applications: military mission planning, crew training, civil engineering, architecture, virtual reality entertainments--just a few were mentioned. 3D photorealistic models of urban areas are often discussed now as upgrade from existing 2D geographic information systems. Possibility of site model generation with small details depends on two main factors: available source dataset and computer power resources. In this paper PC based technology is presented, so the scenes of middle resolution (scale of 1:1000) be constructed. Types of datasets are the gray level aerial stereo pairs of photographs (scale of 1:14000) and true color on ground photographs of buildings (scale ca.1:1000). True color terrestrial photographs are also necessary for photorealistic rendering, that in high extent improves human perception of the scene.

  9. 40 CFR 35.930-1 - Types of projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... assistance awarded solely for the acquisition of eligible land, the following provisions are deferred until... required to train and upgrade waste treatment works operations and maintenance personnel and for the costs...

  10. 40 CFR 35.930-1 - Types of projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... assistance awarded solely for the acquisition of eligible land, the following provisions are deferred until... required to train and upgrade waste treatment works operations and maintenance personnel and for the costs...

  11. 40 CFR 35.930-1 - Types of projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assistance awarded solely for the acquisition of eligible land, the following provisions are deferred until... required to train and upgrade waste treatment works operations and maintenance personnel and for the costs...

  12. 40 CFR 35.930-1 - Types of projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... assistance awarded solely for the acquisition of eligible land, the following provisions are deferred until... required to train and upgrade waste treatment works operations and maintenance personnel and for the costs...

  13. 40 CFR 35.930-1 - Types of projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... assistance awarded solely for the acquisition of eligible land, the following provisions are deferred until... required to train and upgrade waste treatment works operations and maintenance personnel and for the costs...

  14. ALA Meets at Ground-Zero, New York City Conference Report.

    ERIC Educational Resources Information Center

    Wilson Library Bulletin, 1986

    1986-01-01

    Description of 1986 American Library Association Conference summarizes significant organizational actions and presentations on upgrading automation systems, censorship, federal libraries, fees and public library services, black community information needs, Linked Systems Project, libraries and the homeless, new products exhibited, and 1994…

  15. KSC-2014-2224

    NASA Image and Video Library

    2014-04-17

    CAPE CANAVERAL, Fla. - Inside the Vehicle Assembly Building at NASA’s Kennedy Space Center in Florida, work continues to remove the sprocket shaft assembly from the C truck of crawler-transporter 2, or CT-2. The sprocket assemblies will be placed into shipping cradles on pallets and positioned on a flatbed trailer. They will be sent to a vendor for inspections and refurbishment. Work continues in high bay 2 to upgrade CT-2. The modifications are designed to ensure CT-2’s ability to transport launch vehicles currently in development, such as the agency’s Space Launch System, to the launch pad. The Ground Systems Development and Operations Program office at Kennedy is overseeing the upgrades. For more than 45 years the crawler-transporters were used to transport the mobile launcher platform and the Apollo-Saturn V rockets and, later, space shuttles to Launch Pads 39A and B. For more information, visit: http://www.nasa.gov/exploration/systems/ground/crawler-transporter. Photo credit: NASA/Dimitri Gerondidakis

  16. Alternative Approach to Vehicle Element Processing

    NASA Technical Reports Server (NTRS)

    Huether, Jacob E.; Otto, Albert E.

    1995-01-01

    The National Space Transportation Policy (NSTP), describes the challenge facing today's aerospace industry. 'Assuring reliable and affordable access to space through U.S. space transportation capabilities is a fundamental goal of the U.S. space program'. Experience from the Space Shuttle Program (SSP) tells us that launch and mission operations are responsible for approximately 45 % of the cost of each shuttle mission. Reducing these costs is critical to NSTP goals in the next generation launch vehicle. Based on this, an innovative alternative approach to vehicle element processing was developed with an emphasis on reduced launch costs. State-of-the-art upgrades to the launch processing system (LPS) will enhance vehicle ground operations. To carry this one step further, these upgrade could be implemented at various vehicle element manufacturing sites to ensure system compatibility between the manufacturing facility and the launch site. Design center vehicle stand alone testing will ensure system integrity resulting in minimized checkout and testing at the launch site. This paper will addresses vehicle test requirements, timelines and ground checkout procedures which enable concept implementation.

  17. Layoff Time Training: A Key to Upgrading Workforce Utilization and EEOC Affirmative Action. A Case Study in the Northern California Canning Industry. R & D Monograph 61.

    ERIC Educational Resources Information Center

    Aller, Curtis C.; And Others

    An experimental and demonstration project was conducted over a five-year period in California to test the concept of lay-off time training to enable workers to qualify for promotion and increase their earnings. The canning industry was found to be a suitable area for this type of training since it had annual lay-offs followed by assured recalls to…

  18. Trends in Employer-Funded Training as an Indicator of Changes in Employment: The Case of Norway in the 1980s.

    ERIC Educational Resources Information Center

    Gooderham, Paul N.; Hines, Kjell

    1995-01-01

    Norwegian data on employer-sponsored training revealed no public-sector support of the neo-Marxist theory of skill degrading; private-sector support for upgrading lower-level jobs and the emergence of flexible organizations; and limited support for bipolarization--increasing skills gap between full- and part-time workers. Bipolarization affected a…

  19. High-Skill Training: Grants from H-1B Visa Fees Meet Specific Workforce Needs, But at Varying Skill Levels. Report to Congressional Requesters.

    ERIC Educational Resources Information Center

    General Accounting Office, Washington, DC. Education, Workforce, and Income Security Issues.

    A study examined the skill grant and scholarship grant programs. Findings indicated skill grantees offered training through various service delivery options to people needing skill upgrading; scholarship grantees provided scholarships to low income students for college degree programs in computer science, mathematics, and engineering. The skill…

  20. Air Land Sea Bulletin

    DTIC Science & Technology

    2014-01-01

    targets. Recent upgrades to the JSTARS have provided a greatly en- hanced capability to conduct maritime surveillance over blue water (oceans and seas...erational plans (OPLANs) without leaving their home station. Cur- rent capabilities allow distributed training at multiple mission train- ing centers...capability allows USPACOM participants to plan from their home station while working directly with units around the world that will support a USPACOM

  1. Keewatin Region Educational Authority Pilot Education Project: Computer-Assisted Learning. Preliminary Final Report.

    ERIC Educational Resources Information Center

    Wolter, Heidi; And Others

    A project was conducted to improve and expand academic upgrading, job readiness, and special skill training for adults in the Keewatin Region through the implementation of computer-assisted learning (CAL). It was intended as a response to the special needs of unemployed Inuit who were not reached in the past by traditional training programs and…

  2. Aspen Plus Model for In Situ and Ex Situ Upgrading of Fast Pyrolysis Vapors for the Conversion of Biomass to Hydrocarbon Fuels

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    This is an Aspen Plus process model for in situ and ex situ upgrading of fast pyrolysis vapors for the conversion of biomass to hydrocarbon fuels. It is based on conceptual designs that allow projections of future commercial implementations of the technologies based on a combination of research and existing commercial technologies. The process model was developed from the ground up at NREL. Results from the model are documented in a detailed design report NREL/TP-5100-62455 (available at http://www.nrel.gov/docs/fy15osti/62455.pdf).

  3. Electromagnetic compatibility (EMC) standard test chamber upgrade requirements for spacecraft design verification tests

    NASA Technical Reports Server (NTRS)

    Dyer, Edward F.

    1992-01-01

    In view of the serious performance deficiencies inherent in conventional modular and welded shielding EMC test enclosures, in which multipath reflections and resonant standing waves can damage flight hardware during RF susceptibility tests, NASA-Goddard has undertaken the modification of a 20 x 24 ft modular-shielded enclosure through installation of steel panels to which ferrite tiles will be mounted with epoxy. The internally reflected RF energy will thereby be absorbed, and exterior power-line noise will be reduced. Isolation of power-line filters and control of 60-Hz ground connections will also be undertaken in the course of upgrading.

  4. KSC-2013-1513

    NASA Image and Video Library

    2013-02-13

    CAPE CANAVERAL, Fla. -- At NASA’s Kennedy Space Center in Florida, the Launch Pad 39B elevator has been upgraded and painted. Also, various fluid interface connections have been installed on the pad. New system connections include chilled water supply-and-return and conditioned air that will be used to provide the mobile launcher with the necessary commodities during launch operations. The Ground Systems Development and Operations Program office at Kennedy is overseeing upgrades and modifications to Pad B to support the launch of NASA’s Space Launch System heavy-lift rocket, which is under design, and new Orion spacecraft. The pads supported space shuttle launches for 30 years. Photo credit: NASA/Frankie Martin

  5. Analysis of remote sensing data for evaluating vegetation resources

    NASA Technical Reports Server (NTRS)

    1971-01-01

    Increased utilization studies for current remote sensor and analysis capabilities included: (1) a review of testing procedures for quantifying the accuracy of photointerpretation; (2) field tests of a fully portable spectral data gathering system, both on the ground and from a helicopter; and (3) a comparison of three methods for obtaining ground information necessary for regional agricultural inventories. A version of the LARS point-by-point classification system was upgraded by the addition of routines to analyze spatial data information.

  6. The Debate is Over: Close Air Support in Korea and Vietnam

    DTIC Science & Technology

    2011-05-03

    F4U Corsair became Marine aviation’s plane of choice. Early models of the Corsair were formidable fighter aircraft best suited for the air...superiority role. By 1944, the Marine Corps made a deliberate effort to transform the Corsair from a fighter to a multi-role fighter- bomber. As such, the F4U...installation of a ten-channel radio facilitated better communications with ground forces. The upgraded Corsair was such an effective ground attack platform

  7. High Speed Operation and Testing of a Fault Tolerant Magnetic Bearing

    NASA Technical Reports Server (NTRS)

    DeWitt, Kenneth; Clark, Daniel

    2004-01-01

    Research activities undertaken to upgrade the fault-tolerant facility, continue testing high-speed fault-tolerant operation, and assist in the commission of the high temperature (1000 degrees F) thrust magnetic bearing as described. The fault-tolerant magnetic bearing test facility was upgraded to operate to 40,000 RPM. The necessary upgrades included new state-of-the art position sensors with high frequency modulation and new power edge filtering of amplifier outputs. A comparison study of the new sensors and the previous system was done as well as a noise assessment of the sensor-to-controller signals. Also a comparison study of power edge filtering for amplifier-to-actuator signals was done; this information is valuable for all position sensing and motor actuation applications. After these facility upgrades were completed, the rig is believed to have capabilities for 40,000 RPM operation, though this has yet to be demonstrated. Other upgrades included verification and upgrading of safety shielding, and upgrading control algorithms. The rig will now also be used to demonstrate motoring capabilities and control algorithms are in the process of being created. Recently an extreme temperature thrust magnetic bearing was designed from the ground up. The thrust bearing was designed to fit within the existing high temperature facility. The retrofit began near the end of the summer, 04, and continues currently. Contract staff authored a NASA-TM entitled "An Overview of Magnetic Bearing Technology for Gas Turbine Engines", containing a compilation of bearing data as it pertains to operation in the regime of the gas turbine engine and a presentation of how magnetic bearings can become a viable candidate for use in future engine technology.

  8. Gastroenterology training in private hospitals: India vs South Africa

    PubMed Central

    Mulder, Chris Jacob Johan; Puri, Amarender Singh; Reddy, Duvvur Nageshwar

    2010-01-01

    In South Africa, nurses and doctors are emigrating in significant numbers. Job satisfaction, safety and ensuring career progression are important in retaining doctors to make a career in Republic of South Africa (RSA). Due to budgetary constraints many hospitals have not been upgraded. Coming home after overseas training seems difficult. In RSA it takes a minimum of 13 years for a young specialist to become registered and 15 years for subspecialists. Career progression, creating more specialist trainees in public and private hospitals and shortening the period of professional training are potential solutions to the problem. India, which has a population of more than 1 billion people, is struggling with similar problems. For the past 10-15 years, private hospitals have assisted in manpower development for medical specialist and subspecialist careers. Currently their private sector trains 60% of their recognised (sub)specialities fellows. A national task force for specialist training in RSA should be instituted. It should discuss, based on the current status and projected specialist and subspecialist personnel requirements, the future structure and logistics of training needs. This is required in all subspecialities including gastroenterology, as has been done in India. It is hoped that as a consequence well-trained doctors, similar to those in India, might move to provincial hospitals in rural areas, upgrading the medical services and keeping medical power in South Africa. South Africa should become a model for Sub-Saharan Africa, as India already is for South-East Asia. PMID:20180232

  9. Climate balance of biogas upgrading systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Pertl, A., E-mail: andreas.pertl@boku.ac.a; Mostbauer, P.; Obersteiner, G.

    2010-01-15

    One of the numerous applications of renewable energy is represented by the use of upgraded biogas where needed by feeding into the gas grid. The aim of the present study was to identify an upgrading scenario featuring minimum overall GHG emissions. The study was based on a life-cycle approach taking into account also GHG emissions resulting from plant cultivation to the process of energy conversion. For anaerobic digestion two substrates have been taken into account: (1) agricultural resources and (2) municipal organic waste. The study provides results for four different upgrading technologies including the BABIU (Bottom Ash for Biogas Upgrading)more » method. As the transport of bottom ash is a critical factor implicated in the BABIU-method, different transport distances and means of conveyance (lorry, train) have been considered. Furthermore, aspects including biogas compression and energy conversion in a combined heat and power plant were assessed. GHG emissions from a conventional energy supply system (natural gas) have been estimated as reference scenario. The main findings obtained underlined how the overall reduction of GHG emissions may be rather limited, for example for an agricultural context in which PSA-scenarios emit only 10% less greenhouse gases than the reference scenario. The BABIU-method constitutes an efficient upgrading method capable of attaining a high reduction of GHG emission by sequestration of CO{sub 2}.« less

  10. Parris Island Wastewater Treatment Plant SCADA Upgrades Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meador, Richard J.; Hatley, Darrel D.

    2004-03-18

    Marine Corp Recruit Depot (MCRD), Parris Island, SC, home of the Easter Recruiting Region Marine Corp Boot Camp, found itself in a situation common to Department of Defense (DOD) facilities. It had to deal with several different types of installed energy-related control systems that could not talk to each other. This situation was being exacerbated by the installation of a new and/or unique type of control system for every new building being constructed or older facility that was being upgraded. The Wastewater Treatment Facility (WWTF) and lift station controls were badly in need of a thorough inspection and a newmore » Supervisory Control and Data Acquisition (SCADA) system upgrade to meet environmental, safety, manpower, and maintenance concerns. A project was recently completed to implement such a wastewater treatment SCADA upgrade, which is compatible with other upgrades to the energy monitoring and control systems for Parris Island buildings and the Pacific Northwest National Laboratory (PNNL) Decision Support for Operations and Maintenance (DSOM) system installed at the Central Energy Plant (CEP). This project included design, specification, procurement, installation, and testing an upgraded SCADA alarm, process monitoring, and display system; and training WWTF operators in its operation. The ultimate goal of this and the other PNNL projects at Parris Island is to allow monitoring and control of energy and environmental components from a central location.« less

  11. Development of an Ocular and Craniofacial Trauma Treatment Training System

    DTIC Science & Technology

    2013-08-01

    Craniofacial Trauma Treatment Training System PRINCIPAL INVESTIGATOR: Mark P. Ottensmeyer, Ph.D. CONTRACTING ORGANIZATION: Massachusetts...Annual 3. DATES COVERED 11 July 2012 – 10 July 2013 4. TITLE AND SUBTITLE Development of an Ocular and Craniofacial Trauma Treatment Training System...15    Review of  treatment  modes and potential error modes to be detected ................... 15 2.3.2.a.   Implement  improvements  for  upgraded

  12. TECHNOLOGIES FOR UPGRADING EXISTING OR DESIGNING NEW DRINKING WATER TREATMENT FACILITIES

    EPA Science Inventory

    The publication compiles material presented at a series of workshops and helps to focus attention on the many treatment and disinfection decisions that will be facing both ground water and surface source systems over the next several years, as implementation of the 1986 Safe Drin...

  13. Investigating dynamical complexity in the time series of the upgraded ENIGMA magnetometer array using various entropy measures

    NASA Astrophysics Data System (ADS)

    Balasis, Georgios; Daglis, Ioannis A.; Papadimitriou, Constantinos; Melis, Nikolaos; Giannakis, Omiros; Kontoes, Charalampos

    2016-04-01

    The HellENIc GeoMagnetic Array (ENIGMA) is a network of 3 ground-based magnetometer stations in the areas of Trikala, Attiki and Lakonia in Greece that provides measurements for the study of geomagnetic pulsations, resulting from the solar wind - magnetosphere coupling. ENIGMA magnetometer array enables effective remote sensing of geospace dynamics and the study of space weather effects on the ground (i.e., Geomagnetically Induced Currents - GIC). ENIGMA contributes data to SuperMAG, a worldwide collaboration of organizations and national agencies that currently operate more than 300 ground-based magnetometers. ENIGMA is currently extended and upgraded receiving financial support through the national funding KRIPIS project and European Commission's BEYOND project. In particular, the REGPOT project BEYOND is an FP7 project that aims to maintain and expand the existing state-of-the-art interdisciplinary research potential, by Building a Centre of Excellence for Earth Observation based monitoring of Natural Disasters in south-eastern Europe, with a prospect to increase its access range to the wider Mediterranean region through the integrated cooperation with twining organizations. This study explores the applicability and effectiveness of a variety of computable entropy measures to the ENIGMA time series in order to investigate dynamical complexity between pre-storm activity and magnetic storms.

  14. The Network Operations Control Center upgrade task: Lessons learned

    NASA Technical Reports Server (NTRS)

    Sherif, J. S.; Tran, T.-L.; Lee, S.

    1994-01-01

    This article synthesizes and describes the lessons learned from the Network Operations Control Center (NOCC) upgrade project, from the requirements phase through development and test and transfer. At the outset, the NOCC upgrade was being performed simultaneously with two other interfacing and dependent upgrades at the Signal Processing Center (SPC) and Ground Communications Facility (GCF), thereby adding a significant measure of complexity to the management and overall coordination of the development and transfer-to-operations (DTO) effort. Like other success stories, this project carried with it the traditional elements of top management support and exceptional dedication of cognizant personnel. Additionally, there were several NOCC-specific reasons for success, such as end-to-end system engineering, adoption of open-system architecture, thorough requirements management, and use of appropriate off-the-shelf technologies. On the other hand, there were several difficulties, such as ill-defined external interfaces, transition issues caused by new communications protocols, ambivalent use of two sets of policies and standards, and mistailoring of the new JPL management standard (due to the lack of practical guidelines). This article highlights the key lessons learned, as a means of constructive suggestions for the benefit of future projects.

  15. GENERALIZATION OF TREADMILL-SLIP TRAINING TO PREVENT A FALL FOLLLOWING A SUDDEN (NOVEL) SLIP IN OVER-GROUND WALKING

    PubMed Central

    Yang, Feng; Bhatt, Tanvi; Pai, Yi-Chung

    2012-01-01

    The purposes of the study were to determine 1) whether treadmill-slip training could reduce the likelihood of falls during a novel slip in over-ground walking, and 2) to what extent such (indirect) training would be comparable to (direct) over-ground-slip training. A treadmill-slip training group (Group A, n=17) initially experienced repeated perturbations on treadmill intended to simulate forward-slip in over-ground walking. Perturbation continued and its intensity reduced when necessary to ensure subjects’ successful adaptation (i.e., when they could land their trailing foot ahead of the slipping foot in at least 3 of 5 consecutive trials). They then experienced a novel slip during over-ground walking. Another 17 young adults in Group B experienced an identical novel slip that served as the controls. They then underwent more slip trials during over-ground walking. Their 16th slip trial was analyzed to represent the over-ground-slip training effect. Eight subjects (47%) in Group A fell upon their first treadmill slip, while all adapted successfully after a minimum of 15 slip trials. Upon the novel slip during over-ground walking, none of them fell in comparison to four subjects (23.5%) fell in Group B upon the same trial (p<0.05). Group A’s control of stability, both proactive and reactive, was significantly better than that of Group B’s on their first over-ground slip, while the level of improvement derived from indirect treadmill training was not as strong as that from direct over-ground-slip training, as demonstrated in Group B’s 16th slip trial (p<0.001). These results clearly demonstrated the feasibility of fall reduction through treadmill-slip training. PMID:23141636

  16. Teachers and Their Use of Educational Technology. Report of a Regional Training Workshop (Seoul, South Korea, September 16-27, 1985).

    ERIC Educational Resources Information Center

    United Nations Educational, Scientific, and Cultural Organization, Bangkok (Thailand). Regional Office for Education in Asia and the Pacific.

    The workshop described in this report focused on uses of educational technology in the training and upgrading of teachers and on promoting the use of appropriate educational technology techniques by teachers. Experiences in the use of educational technology are described for each of the participating nations, i.e., Bangladesh, India, Indonesia,…

  17. Vocational Studies, Lifelong Learning and Social Values: Investigating Education, Training and NVQs under the New Deal. Monitoring Change in Education [Series].

    ERIC Educational Resources Information Center

    Hyland, Terry

    This book examines the New Labour policy on lifelong learning in Great Britain. Special attention is paid to developments surrounding the University for Industry and the New Deal initiatives and the issue of upgrading the British vocational education and training (VET) system to match those of Britain's European competitors. The following are…

  18. Multi-Level Policy Transfer in Turkey and Its Impact on the Development of the Vocational Education and Training (VET) Sector

    ERIC Educational Resources Information Center

    Barabasch, Antje; Petrick, Stefanie

    2012-01-01

    In its attempt to become a member of the European Union (EU), Turkey is challenged to upgrade its workforce to keep up with economic developments and improve the living conditions in the country. Multiple policy players on global, European and transnational levels are assisting in reforming Turkey's vocational education and training (VET) sector.…

  19. Training Nurse's Aides to Become Licensed Practical Nurses in Isolated Rural Hospitals. Final Report (May 1, 1971-April 30, 1972).

    ERIC Educational Resources Information Center

    Arkansas State Dept. of Education, Little Rock. Div. of Vocational Education.

    This 1-year pilot project in training nurse's aides to become eligible for licensing as practical nurses in isolated rural hospitals was designed to upgrade their skills, expand their theoretical knowledge, and aid in occupational mobility upon successful completion of the program and the State's examination. Conducted in a typical rural hospital…

  20. Control console replacement at the WPI Reactor

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-01-01

    With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduatemore » use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.« less

  1. CMS Analysis School Model

    NASA Astrophysics Data System (ADS)

    Malik, S.; Shipsey, I.; Cavanaugh, R.; Bloom, K.; Chan, Kai-Feng; D'Hondt, J.; Klima, B.; Narain, M.; Palla, F.; Rolandi, G.; Schörner-Sadenius, T.

    2014-06-01

    To impart hands-on training in physics analysis, CMS experiment initiated the concept of CMS Data Analysis School (CMSDAS). It was born over three years ago at the LPC (LHC Physics Centre), Fermilab and is based on earlier workshops held at the LPC and CLEO Experiment. As CMS transitioned from construction to the data taking mode, the nature of earlier training also evolved to include more of analysis tools, software tutorials and physics analysis. This effort epitomized as CMSDAS has proven to be a key for the new and young physicists to jump start and contribute to the physics goals of CMS by looking for new physics with the collision data. With over 400 physicists trained in six CMSDAS around the globe, CMS is trying to engage the collaboration in its discovery potential and maximize physics output. As a bigger goal, CMS is striving to nurture and increase engagement of the myriad talents, in the development of physics, service, upgrade, education of those new to CMS and the career development of younger members. An extension of the concept to the dedicated software and hardware schools is also planned, keeping in mind the ensuing upgrade phase.

  2. Turn Basin Construction

    NASA Image and Video Library

    2017-06-14

    Modifications are underway at the Launch Complex 39 turn basin wharf at NASA's Kennedy Space Center in Florida to prepare for the arrival of the agency's massive Space Launch System (SLS) core booster aboard the barge Pegasus. Construction workers with Southeast Cherokee Construction Inc. work to shore up the turn basin area. A crane will be used to lift up precast concrete poles and position them to be driven to a depth of about 70 feet into the bedrock below the water around the turn basin. The upgrades are necessary to accommodate the 300,000-pound core booster aboard the modified Pegasus barge. The Ground Systems Development and Operations Program is overseeing the upgrades to the turn basin wharf.

  3. Final Flame Trench Brick Installation at Launch Pad 39B

    NASA Image and Video Library

    2017-05-09

    The final brick was installed on the north side of the flame trench at Launch Complex 39B at NASA’s Kennedy Space Center in Florida. The walls of the flame trench are being upgraded to withstand the intense heat and fire at launch of NASA's Space Launch System rocket with Orion atop. About 96,000 heat-resistant bricks, in three different sizes, were secured to the walls using bonding mortar in combination with adhesive anchors. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to Pad 39B to support the launch of the SLS and Orion spacecraft for Exploration Mission-1 and NASA’s journey to Mars.

  4. Final Flame Trench Brick Installation at Launch Pad 39B

    NASA Image and Video Library

    2017-05-09

    Construction workers sign the final bricks after they were installed on the north side of the flame trench at Launch Complex 39B at NASA’s Kennedy Space Center in Florida. The walls of the flame trench are being upgraded to withstand the intense heat and fire at launch of NASA's Space Launch System rocket with Orion atop. About 96,000 heat-resistant bricks, in three different sizes, were secured to the walls using bonding mortar in combination with adhesive anchors. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to Pad 39B to support the launch of the SLS and Orion spacecraft for Exploration Mission-1 and NASA’s journey to Mars.

  5. Final Flame Trench Brick Installation at Launch Pad 39B

    NASA Image and Video Library

    2017-05-09

    A construction worker installs one of the final bricks on the north side of the flame trench at Launch Complex 39B at NASA's Kennedy Space Center in Florida. The walls of the flame trench are being upgraded to withstand the intense heat and fire at launch of NASA's Space Launch System rocket with Orion atop. About 96,000 heat-resistant bricks, in three different sizes, were secured to the walls using bonding mortar in combination with adhesive anchors. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to Pad 39B to support the launch of the SLS and Orion spacecraft for Exploration Mission-1 and NASA’s journey to Mars.

  6. Final Flame Trench Brick Installation at Launch Pad 39B

    NASA Image and Video Library

    2017-05-09

    A view looking up from the north side of the flame trench beneath the pad at Launch Complex 39B at NASA's Kennedy Space Center in Florida. The walls of the flame trench are being upgraded to withstand the intense heat and fire at launch of NASA's Space Launch System rocket with Orion atop. About 96,000 heat-resistant bricks, in three different sizes, were secured to the walls using bonding mortar in combination with adhesive anchors. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to Pad 39B to support the launch of the SLS and Orion spacecraft for Exploration Mission-1 and NASA’s journey to Mars.

  7. Final Flame Trench Brick Installation at Launch Pad 39B

    NASA Image and Video Library

    2017-05-09

    Preparations are underway to install the final brick on the north side of the flame trench at Launch Complex 39B at NASA's Kennedy Space Center in Florida. The walls of the flame trench are being upgraded to withstand the intense heat and fire at launch of NASA's Space Launch System rocket with Orion atop. About 96,000 heat-resistant bricks, in three different sizes, were secured to the walls using bonding mortar in combination with adhesive anchors. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to Pad 39B to support the launch of the SLS and Orion spacecraft for Exploration Mission-1 and NASA’s journey to Mars.

  8. Final Flame Trench Brick Installation at Launch Pad 39B

    NASA Image and Video Library

    2017-05-09

    A construction worker installs the final brick on the north side of the flame trench at Launch Complex 39B at NASA's Kennedy Space Center in Florida. The walls of the flame trench are being upgraded to withstand the intense heat and fire at launch of NASA's Space Launch System rocket with Orion atop. About 96,000 heat-resistant bricks, in three different sizes, were secured to the walls using bonding mortar in combination with adhesive anchors. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to Pad 39B to support the launch of the SLS and Orion spacecraft for Exploration Mission-1 and NASA’s journey to Mars.

  9. Final Flame Trench Brick Installation at Launch Pad 39B

    NASA Image and Video Library

    2017-05-09

    Construction workers install the final bricks on the north side of the flame trench at Launch Complex 39B at NASA's Kennedy Space Center in Florida. The walls of the flame trench are being upgraded to withstand the intense heat and fire at launch of NASA's Space Launch System rocket with Orion atop. About 96,000 heat-resistant bricks, in three different sizes, were secured to the walls using bonding mortar in combination with adhesive anchors. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to Pad 39B to support the launch of the SLS and Orion spacecraft for Exploration Mission-1 and NASA’s journey to Mars.

  10. Energy Management Contract Saves Money.

    ERIC Educational Resources Information Center

    School Business Affairs, 1983

    1983-01-01

    An energy service contract offered to educational institutions by a commercial company guarantees a specific reduction in energy consumption over a stated term of years. The company pays for equipment upgrading, staff training, repairs, a maintenance program, and capital improvements. (MLF)

  11. 14 CFR 141.45 - Ground training facilities.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Ground training facilities. 141.45 Section 141.45 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... § 141.45 Ground training facilities. An applicant for a pilot school or provisional pilot school...

  12. 14 CFR 141.45 - Ground training facilities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Ground training facilities. 141.45 Section 141.45 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED... § 141.45 Ground training facilities. An applicant for a pilot school or provisional pilot school...

  13. In Buyer's Market, Colleges Turn to Posh Dorms and Fast Food to Lure Students.

    ERIC Educational Resources Information Center

    Collison, Michele N-K.

    1989-01-01

    More and more colleges are building fancy residence halls and improving their grounds to stand out in an increasingly competitive market for freshmen. Colleges are also finding that they must upgrade their dining halls because students are going off campus for pizza and other fast food. (MLW)

  14. 78 FR 71635 - Federal Property Suitable as Facilities To Assist the Homeless

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-29

    ...; poor conditions; asbestos/lead; contact Interior for more info. Imperial Dam Camp House 1 2400 Imperial.../upgrades needed; asbestos/lead; contact Interior for more info. Bldg. 2172 Marine Corps Air Ground Task... exterior/interior wood damage; asbestos/lead; secured area; contact Navy for more info. Bldg. 2175 Marine...

  15. Thigh Muscle Activity, Knee Motion, and Impact Force During Side-Step Pivoting in Agility-Trained Female Basketball Players

    PubMed Central

    Wilderman, Danielle R; Ross, Scott E; Padua, Darin A

    2009-01-01

    Context: Improving neuromuscular control of hamstrings muscles might have implications for decreasing anterior cruciate ligament injuries in females. Objective: To examine the effects of a 6-week agility training program on quadriceps and hamstrings muscle activation, knee flexion angles, and peak vertical ground reaction force. Design: Prospective, randomized clinical research trial. Setting: Sports medicine research laboratory. Patients or Other Participants: Thirty female intramural basketball players with no history of knee injury (age  =  21.07 ± 2.82 years, height  =  171.27 ± 4.66 cm, mass  =  66.36 ± 7.41 kg). Intervention(s): Participants were assigned to an agility training group or a control group that did not participate in agility training. Participants in the agility training group trained 4 times per week for 6 weeks. Main Outcome Measure(s): We used surface electromyography to assess muscle activation for the rectus femoris, vastus medialis oblique, medial hamstrings, and lateral hamstrings for 50 milliseconds before initial ground contact and while the foot was in contact with the ground during a side-step pivot maneuver. Knee flexion angles (at initial ground contact, maximum knee flexion, knee flexion displacement) and peak vertical ground reaction force also were assessed during this maneuver. Results: Participants in the training group increased medial hamstrings activation during ground contact after the 6-week agility training program. Both groups decreased their vastus medialis oblique muscle activation during ground contact. Knee flexion angles and peak vertical ground reaction force did not change for either group. Conclusions: Agility training improved medial hamstrings activity in female intramural basketball players during a side-step pivot maneuver. Agility training that improves hamstrings activity might have implications for reducing anterior cruciate ligament sprain injury associated with side-step pivots. PMID:19180214

  16. Re-Engineering of the Hubble Space Telescope (HST) to Reduce Operational Costs

    NASA Technical Reports Server (NTRS)

    Garvis, Michael; Dougherty, Andrew; Whittier, Wallace

    1996-01-01

    Satellite telemetry processing onboard the Hubble Space Telescope (HST) is carried out using dedicated software and hardware. The current ground system is expensive to operate and maintain. The mandate to reduce satellite ground system operations and maintenance costs by the year 2000 led NASA to upgrade the command and control systems in order to improve the data processing capabilities, reduce operator experience levels and increase system standardization. As a result, a command and control system product development team was formed to redesign and develop the HST ground system. The command and control system ground system development consists of six elements. The results of the prototyping phase carried out for the following of these elements are presented: the front end processor; middleware, and the graphical user interface.

  17. Better O and M Programs is Ultimate Answer to O and M Problems

    ERIC Educational Resources Information Center

    Davanzo, A. C.; Thompson, William B.

    1978-01-01

    Describes is an improvement program for the operation and maintenance of municipal wastewater treatment plants in Detroit, Michigan. Improvements included expansion and upgrading of the existing city plant and a training program for plant personnel. (MA)

  18. Remote sensing observing systems of the Meteorological Service of Catalonia (SMC): application to thunderstorm surveillance

    NASA Astrophysics Data System (ADS)

    Argemí, O.; Bech, J.; Pineda, N.; Rigo, T.

    2009-09-01

    Remote sensing observing systems of the Meteorological Service of Catalonia (SMC) have been upgraded during the last years with newer technologies and enhancements. Recent changes on the weather radar network have been motivated to improve precipitation estimates by radar as well as meteorological surveillance in the area of Catalonia. This region has approximately 32,000 square kilometres and is located in the NE of Spain, limited by the Pyrenees to the North (with mountains exceeding 3000 m) and by the Mediterranean Sea to the East and South. In the case of the total lightning (intra-cloud and cloud-to-ground lightning) detection system, the current upgrades will assure a better lightning detection efficiency and location accuracy. Both upgraded systems help to enhance the tracking and the study of thunderstorm events. Initially, the weather radar network was designed to cover the complex topography of Catalonia and surrounding areas to support the regional administration, which includes civil protection and water authorities. The weather radar network was upgraded in 2008 with the addition of a new C-band Doppler radar system, which is located in the top of La Miranda Mountain (Tivissa) in the southern part of Catalonia enhancing the coverage, particularly to the South and South-West. Technically the new radar is very similar to the last one installed in 2003 (Creu del Vent radar), using a 4 m antenna (i.e., 1 degree beam width), a Vaisala-Sigmet RVP-8 digital receiver and processor and a low power transmitter using a Travelling Wave Tube (TWT) amplifier. This design allows using pulse-compression techniques to enhance radial resolution and sensitivity. Currently, the SMC is upgrading its total lightning detection system, operational since 2003. While a fourth sensor (Amposta) was added last year to enlarge the system coverage, all sensors and central processor will be upgraded this year to the new Vaisala’s total lightning location technology. The new LS8000 sensor configuration integrates two lightning detection technologies: VHF interferometry technology provides high performance in detection of cloud lightning, while LF combined magnetic direction finding and time-of-arrival technology offers a highest detection efficiency and accurate location for cloud-to-ground lightning strokes. The presentation describes in some detail all this innovation in remote sensing observing networks and also reports some examples over Catalonia which is frequently affected by different types of convective events, including severe weather (large hail, tornadic events, etc.) and heavy rainfall episodes.

  19. Operational experience on the generation and control of high brightness electron bunch trains at SPARC-LAB

    NASA Astrophysics Data System (ADS)

    Mostacci, A.; Alesini, D.; Anania, M. P.; Bacci, A.; Bellaveglia, M.; Biagioni, A.; Cardelli, F.; Castellano, Michele; Chiadroni, Enrica; Cianchi, Alessandro; Croia, M.; Di Giovenale, Domenico; Di Pirro, Giampiero; Ferrario, Massimo; Filippi, Francesco; Gallo, Alessandro; Gatti, Giancarlo; Giribono, Anna; Innocenti, L.; Marocchino, A.; Petrarca, M.; Piersanti, L.; Pioli, S.; Pompili, Riccardo; Romeo, Stefano; Rossi, Andrea Renato; Shpakov, V.; Scifo, J.; Vaccarezza, Cristina; Villa, Fabio; Weiwei, L.

    2015-05-01

    Sub-picosecond, high-brightness electron bunch trains are routinely produced at SPARC-LAB via the velocity bunching technique. Such bunch trains can be used to drive multi-color Free Electron Lasers (FELs) and plasma wake field accelerators. In this paper we present recent results at SPARC-LAB on the generation of such beams, highlighting the key points of our scheme. We will discuss also the on-going machine upgrades to allow driving FELs with plasma accelerated beams or with short electron pulses at an increased energy.

  20. AN EXPERIMENTAL ASSESSMENT OF A GROUND PILOT TRAINER IN GENERAL AVIATION.

    ERIC Educational Resources Information Center

    PHILLIPS, C.R., JR.

    EXPERIMENTAL FLIGHT TRAINING WAS CONDUCTED IN CONJUNCTION WITH A COMMERCIAL MODEL GROUND TRAINER TO DETERMINE ITS EFFECTIVENESS IN CONTRIBUTING TO THE PROFICIENCY LEVEL USUALLY OBTAINED BY STUDENTS UNDERGOING A RIGIDLY CONTROLLED FLIGHT SYLLABUS WITHOUT USE OF SYNTHETIC TRAINING DEVICES. DIFFERENTIAL LEVELS OF TRAINING WITH THE GROUND TRAINERS…

  1. A training network for introducing telemedicine, telecare and hospital informatics in the Adriatic-Danube-Black Sea region.

    PubMed

    Anogeianaki, Antonia; Ilonidis, George; Anogianakis, George; Lianguris, John; Katsaros, Kyriakos; Pseftogianni, Dimitra; Klisarova, Anelia; Negrev, Negrin

    2004-01-01

    DIMNET is a training mechanism for a region of central Europe. The aim is to upgrade the information technology skills of local hospital personnel and preserve their employability following the introduction of medical informatics. DIMNET uses Internet-based virtual classrooms to provide a 200-hour training course in medical informatics. Training takes place in the cities of Drama, Kavala, Xanthi and Varna. So far, more than 600 people have benefited from the programme. Initial results are encouraging. DIMNET promotes a new vocational training culture in the Balkans and is supported by local governments that perceive health-care as a fulcrum for economic development.

  2. AirSTAR Hardware and Software Design for Beyond Visual Range Flight Research

    NASA Technical Reports Server (NTRS)

    Laughter, Sean; Cox, David

    2016-01-01

    The National Aeronautics and Space Administration (NASA) Airborne Subscale Transport Aircraft Research (AirSTAR) Unmanned Aerial System (UAS) is a facility developed to study the flight dynamics of vehicles in emergency conditions, in support of aviation safety research. The system was upgraded to have its operational range significantly expanded, going beyond the line of sight of a ground-based pilot. A redesign of the airborne flight hardware was undertaken, as well as significant changes to the software base, in order to provide appropriate autonomous behavior in response to a number of potential failures and hazards. Ground hardware and system monitors were also upgraded to include redundant communication links, including ADS-B based position displays and an independent flight termination system. The design included both custom and commercially available avionics, combined to allow flexibility in flight experiment design while still benefiting from tested configurations in reversionary flight modes. A similar hierarchy was employed in the software architecture, to allow research codes to be tested, with a fallback to more thoroughly validated flight controls. As a remotely piloted facility, ground systems were also developed to ensure the flight modes and system state were communicated to ground operations personnel in real-time. Presented in this paper is a general overview of the concept of operations for beyond visual range flight, and a detailed review of the airborne hardware and software design. This discussion is held in the context of the safety and procedural requirements that drove many of the design decisions for the AirSTAR UAS Beyond Visual Range capability.

  3. Optimizing Training Event Schedules at Naval Air Station Fallon

    DTIC Science & Technology

    2018-03-01

    popularly known as Topgun. Fallon training range airspace overlays 10,200 square miles and contains ground ranges for bombing and electronic warfare. In...Fighter Weapons School, popularly known as Topgun. Fallon training range airspace overlays 10,200 square miles and contains ground ranges for bombing and...popularly known as Topgun. Fallon training range airspace overlays 10,200 squaremiles, and contains ground ranges for bombing and electronic warfare. In

  4. Adult Education Career Path Training Resources. A Method, a Process, and a Few Examples: How to Motivate and Develop Minority Workers Starting Work in Entry Level Jobs via Adult Education.

    ERIC Educational Resources Information Center

    Alvir, Howard P.

    This package contains self-paced training materials for mental health aides, designed to increase career mobility for lower grade Civil Service employees by preparing them to pass a Civil Service examination for upgrading. Procedures are described whereby the materials were developed by educational personnel at several adult education centers and…

  5. Nevada Training Initiative Environmental Assessment

    DTIC Science & Technology

    2003-07-01

    ALTERNA TIVES The U.S. Air Force. Headquarters Air Combat Command (ACC) proposes t o construct a Military Operations in Urban Terrain (MOUT) Training...facilities along with upgrades of existing fncilities. The MOUT wou ld encompass approximately 97 acres, with construction phased O \\’er a 5-year period...action alternatives and the no- action alternative. Both action alternatives arc located in the South Range o fN1TR and propose placing the MOUT

  6. Field evaluations of newly available "interference-free" monitors for nitrogen dioxide and ozone at near-road and conventional National Ambient Air Quality Standards compliance sites.

    PubMed

    Leston, Alan R; Ollison, Will M

    2017-11-01

    Long-standing measurement techniques for determining ground-level ozone (O 3 ) and nitrogen dioxide (NO 2 ) are known to be biased by interfering compounds that result in overestimates of high O 3 and NO 2 ambient concentrations under conducive conditions. An increasing near-ground O 3 gradient (NGOG) with increasing height above ground level is also known to exist. Both the interference bias and NGOG were investigated by comparing data from a conventional Federal Equivalent Method (FEM) O 3 photometer and an identical monitor upgraded with an "interference-free" nitric oxide O 3 scrubber that alternatively sampled at 2 m and 6.2 m inlet heights above ground level (AGL). Intercomparison was also made between a conventional nitrogen oxide (NO x ) chemiluminescence Federal Reference Method (FRM) monitor and a new "direct-measure" NO 2 NO x 405 nm photometer at a near-road air quality measurement site. Results indicate that the O 3 monitor with the upgraded scrubber recorded lower regulatory-oriented concentrations than the deployed conventional metal oxide-scrubbed monitor and that O 3 concentrations 6.2 m AGL were higher than concentrations 2.0 m AGL, the nominal nose height of outdoor populations. Also, a new direct-measure NO 2 photometer recorded generally lower NO 2 regulatory-oriented concentrations than the conventional FRM chemiluminescence monitor, reporting lower daily maximum hourly average concentrations than the conventional monitor about 3 of every 5 days. Employing bias-prone instruments for measurement of ambient ozone or nitrogen dioxide from inlets at inappropriate heights above ground level may result in collection of positively biased data. This paper discusses tests of new regulatory instruments, recent developments in bias-free ozone and nitrogen dioxide measurement technology, and the presence/extent of a near-ground O 3 gradient (NGOG). Collection of unbiased monitor inlet height-appropriate data is crucial for determining accurate design values and meeting National Ambient Air Quality Standards.

  7. Time to Reinvest in Human Enterprise.

    ERIC Educational Resources Information Center

    Penning, Nick

    1992-01-01

    A number of analysts and leaders state that investments must be made in furthering employees' skills and upgrading the nation's infrastructure. Revenue resources suggested include changes in the tax code to target those "on the gravy train" and reclaiming funds from the military budget. (MLF)

  8. Human Resource Managers Rank Their Pressure Points.

    ERIC Educational Resources Information Center

    Herring, Jack

    1983-01-01

    A survey of 700 top-level human resource executives that elicited 309 responses revealed the highest priority ranking of 24 human resource issues to be: productivity improvement, controlling costs of employee benefits, compensation planning and administration, employee communications, upgrading management training development programs,…

  9. Opportunity or Obligation? Participation in Adult Vocational Training.

    ERIC Educational Resources Information Center

    Hemsley-Brown, Jane; Humphreys, John

    1998-01-01

    British nurses (n=275), many of whom had to upgrade skills for conversion to registered nursing, participated in an upskilling exercise. Participants and a comparison group of nonparticipants were categorized as either opportunity-takers or conscripts (those who viewed retraining as obligatory). (SK)

  10. Flight simulator platform motion and air transport pilot training

    NASA Technical Reports Server (NTRS)

    Lee, Alfred T.; Bussolari, Steven R.

    1987-01-01

    The effect of a flight simulator platform motion on the performance and training of a pilot was evaluated using subjective ratings and objective performance data obtained on experienced B-727 pilots and pilots with no prior heavy aircraft flying experience flying B-727-200 aircraft simulator used by the FAA in the upgrade and transition training for air carrier operations. The results on experienced pilots did not reveal any reliable effects of wide variations in platform motion design. On the other hand, motion variations significantly affected the behavior of pilots without heavy-aircraft experience. The effect was limited to pitch attitude control inputs during the early phase of landing training.

  11. Final Flame Trench Brick Installation at Launch Pad 39B

    NASA Image and Video Library

    2017-05-09

    A view of the north side of the flame trench at Launch Complex 39B at NASA's Kennedy Space Center in Florida. The final brick was installed in the flame trench, completing about a year's worth of work to upgrade the walls to withstand the intense heat and fire at launch of NASA's Space Launch System rocket with Orion atop. About 96,000 heat-resistant bricks, in three different sizes, were secured to the walls using bonding mortar in combination with adhesive anchors. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to Pad 39B to support the launch of the SLS and Orion spacecraft for Exploration Mission-1 and NASA’s journey to Mars.

  12. 14 CFR 61.1 - Applicability and definitions.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ..., or flight training device for meeting the appropriate training and flight time requirements for an... this chapter and is in compliance with § 61.217, when conducting ground training in accordance with the... conducting ground training or flight training in accordance with the privileges and limitations of his or her...

  13. Control console replacement at the WPI Reactor. [Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-12-31

    With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Upgrade Program (DOE Grant No. DE-FG02-90ER12982), the original control console at the Worcester Polytechnic Institute (WPI) Reactor has been replaced with a modern system. The new console maintains the original design bases and functionality while utilizing current technology. An advanced remote monitoring system has been added to augment the educational capabilities of the reactor. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduatemore » use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The reactor power level was upgraded from 1 to 10 kill in 1969, and its operating license was renewed for 20 years in 1983. In 1988, the reactor was converted to low enriched uranium. The low power output of the reactor and ergonomic facility design make it an ideal tool for undergraduate nuclear engineering education and other training.« less

  14. CMS Analysis School Model

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Malik, S.; Shipsey, I.; Cavanaugh, R.

    To impart hands-on training in physics analysis, CMS experiment initiated the concept of CMS Data Analysis School (CMSDAS). It was born over three years ago at the LPC (LHC Physics Centre), Fermilab and is based on earlier workshops held at the LPC and CLEO Experiment. As CMS transitioned from construction to the data taking mode, the nature of earlier training also evolved to include more of analysis tools, software tutorials and physics analysis. This effort epitomized as CMSDAS has proven to be a key for the new and young physicists to jump start and contribute to the physics goals ofmore » CMS by looking for new physics with the collision data. With over 400 physicists trained in six CMSDAS around the globe, CMS is trying to engage the collaboration in its discovery potential and maximize physics output. As a bigger goal, CMS is striving to nurture and increase engagement of the myriad talents, in the development of physics, service, upgrade, education of those new to CMS and the career development of younger members. An extension of the concept to the dedicated software and hardware schools is also planned, keeping in mind the ensuing upgrade phase.« less

  15. Indissoluble Connection of Russian MC&A System Sustainability with that of the Russian Methodological & Training Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ryazanov, Boris G.; Goryunov, Victor; Pshakin, Gennady M.

    During the past 10 years of collaboration under the U.S.-Russian Materials Protection, Control and Accounting (MPC&A) Program great efforts were made to transform and upgrade the Russian Federal Nuclear Materials Control and Accounting (MC&A) System. The efforts were focused not only on MC&A systems for nuclear facilities but also on creating and developing the system infrastructure, including legislation, state inspection and agency monitoring, training of operators and inspectors, instrument and methodological support, and the Federal Information System (FIS). At present the most important and urgent goal is to provide sustainability of MC&A systems at the existing level or at themore » level that will be achieved in 2007-2008. Since the very beginning of the program, the Russian Methodological and Training Center (RMTC) activities have been focused on intensive training of the personnel as well as the methodological support necessary for transformation and development of the entire system and its elements located at nuclear facilities. Sustainability of the federal MC&A system is impossible without advanced training of personnel and methodological support for upgrading of system elements at nuclear facilities. That is why the RMTC sustainability is one of the key conditions required for the system sustainability as a whole. The paper presents the results of analysis of the conditions for the Russian MC&A system sustainable development in conjunction with the RMTC sustainability.« less

  16. Integration of NASA Research into Undergraduate Education in Math, Science, Engineering and Technology at North Carolina A&T State University

    NASA Technical Reports Server (NTRS)

    Monroe, Joseph; Kelkar, Ajit

    2003-01-01

    The NASA PAIR program incorporated the NASA-Sponsored research into the undergraduate environment at North Carolina Agricultural and Technical State University. This program is designed to significantly improve undergraduate education in the areas of mathematics, science, engineering, and technology (MSET) by directly benefiting from the experiences of NASA field centers, affiliated industrial partners and academic institutions. The three basic goals of the program were enhancing core courses in MSET curriculum, upgrading core-engineering laboratories to compliment upgraded MSET curriculum, and conduct research training for undergraduates in MSET disciplines through a sophomore shadow program and through Research Experience for Undergraduates (REU) programs. Since the inception of the program nine courses have been modified to include NASA related topics and research. These courses have impacted over 900 students in the first three years of the program. The Electrical Engineering circuit's lab is completely re-equipped to include Computer controlled and data acquisition equipment. The Physics lab is upgraded to implement better sensory data acquisition to enhance students understanding of course concepts. In addition a new instrumentation laboratory in the department of Mechanical Engineering is developed. Research training for A&T students was conducted through four different programs: Apprentice program, Developers program, Sophomore Shadow program and Independent Research program. These programs provided opportunities for an average of forty students per semester.

  17. Automatic dependent surveillance broadcast via GPS-Squitter: a major upgrade to the national airspace system

    NASA Astrophysics Data System (ADS)

    Jones, Ronnie D.; Knittel, George H.; Orlando, Vincent A.

    1995-06-01

    GPS-Squitter is a technology for surveillance of aircraft via broadcast of their GPS-determined positions to all listeners, using the Mode S data link. It can be used to provide traffic displays, on the ground for controllers and in the cockpit for pilots, and will enhance TCAS performance. It is compatible with the existing ground-based beacon interrogator radar system and is an evolutionary way to more from ground-based-radar surveillance to satellite-based surveillance. GPS-Squitter takes advantage of the substantial investment made by the U.S. in the powerful GPS position-determining system and has the potential to free the Federal Aviation Administration from having to continue maintaining a precise position-determining capability in ground-based radar. This would permit phasing out the ground-based secondary surveillance radar system over a period of 10 to 20 years and replacing it with much simpler ground stations, resulting in cost savings of hundreds of millions of dollars.

  18. Space Shuttle Projects

    NASA Image and Video Library

    2001-08-01

    This is the insignia of the STS-109 Space Shuttle mission. Carrying a crew of seven, the Space Shuttle Orbiter Columbia was launched with goals of maintenance and upgrades to the Hubble Space Telescope (HST). The Marshall Space Flight Center had the responsibility for the design, development, and construction of the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit. The HST detects objects 25 times fainter than the dimmest objects seen from Earth and provides astronomers with an observable universe 250 times larger than is visible from ground-based telescopes, perhaps as far away as 14 billion light-years. The HST views galaxies, stars, planets, comets, possibly other solar systems, and even unusual phenomena such as quasars, with 10 times the clarity of ground-based telescopes. During the STS-109 mission, the telescope was captured and secured on a work stand in Columbia's payload bay using Columbia's robotic arm where four members of the crew performed five spacewalks completing system upgrades to the HST. Included in those upgrades were: The replacement of the solar array panels; replacement of the power control unit (PCU); replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near-Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant since January 1999 when it original coolant ran out. Lasting 10 days, 22 hours, and 11 minutes, the STS-109 mission was the 27th flight of the Orbiter Columbia and the 108th flight overall in NASA's Space Shuttle Program.

  19. Multifamily Housing Rehabilitation Process Improvements

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sweet, Marshall L.; Francisco, Abby; Roberts, Sydney G.

    Rea Ventures Group, LLC, (Rea Ventures) partnered with Southface Energy Institute (Southface) on the rehabilitation of 418 low-income rental multifamily apartments located at 14 different properties in Georgia (Climate Zones 2-4). These 22-year old, individually-metered units were arranged in rowhouse or townhouse style units. Rehabilitation plans were developed using a process prescribed by the US Department of Agriculture (USDA) Rural Development program, who partially funded the building upgrades. The USDA is responsible for building, upgrading, and subsidizing housing in rural areas nationwide. In 2012, over $100 million was allocated in grants and loans. Due to the unique financing mechanism asmore » well as long-term ownership requirements, property owners are especially motivated to invest in upgrades that will increase durability and tenant retention. These buildings represent a large stock of rural affordable housing that have the potential for significant energy and cost savings for property owners and tenants. Southface analyzed the energy upgrade potential of one stereotypical property in the Rea Ventures portfolio. This study will provide insight into the most cost-effective, implementable energy efficiency and durability upgrades for this age multifamily housing, having an enormous impact not only on the portfolio of Rea Ventures but on the vast USDA and larger Federal portfolio. Additionally, Southface will identify gaps in the current capital needs assessment process, examine available audit and simulation tools and protocols, and evaluate additional auditor training or certification needs.« less

  20. AN EXPERIMENTAL ASSESSMENT OF A GROUND PILOT TRAINER IN GENERAL AVIATION.

    ERIC Educational Resources Information Center

    CHAPMAN, G. COURTNEY

    THREE GROUPS OF SUBJECTS WERE TRAINED TO PRIVATE PILOT PROFICIENCY, USING A GROUND PILOT TRAINER, TO FIND HOW MANY HOURS OF GROUND TRAINING CAN BE SUBSTITUTED FOR AIRCRAFT DUAL INSTRUCTION. TRAINING TIME REQUIRED WAS COMPARED BETWEEN GROUPS AND WITH THAT OF A CONTROL GROUP NOT USING A TRAINER. THE GROUP THAT USED THE TRAINER MOST NEEDED…

  1. School Leadership in the Caribbean: Perceptions, Practices, Paradigms

    ERIC Educational Resources Information Center

    Miller, Paul, Ed.

    2013-01-01

    Successful school leadership is an issue currently being debated up and down Caribbean territories. Key issues in the ongoing debate include: students' outcomes and participation in the regional Caribbean Secondary Examinations (CSEC); teacher recruitment and retention; teacher training and continuing professional development (upgrading); and…

  2. The Telecommunications and Data Acquisition Report

    NASA Technical Reports Server (NTRS)

    Posner, E. C. (Editor)

    1992-01-01

    Archival reports on developments in programs managed by JPL's Office of Telecommunications and Data Acquisition (TDA) are provided. In space communications, radio navigation, radio science, and ground-based radio and radar astronomy, it reports on activities of the Deep Space Network (DSN) in planning, in supporting research and technology, in implementation, and in operations. Also included is standards activity at JPL for space data and information. In the search for extraterrestrial intelligence (SETI), the TDA Progress Report reports on implementation and operations for searching the microwave spectrum. Topics covered include tracking and ground-based navigation; communications, spacecraft-ground; station control and system technology; capabilities for new projects; network upgrade and sustaining; network operations and operations support; and TDA program management and analysis.

  3. Applications Technology Satellite 6 - Upgrading the life style of millions of people. [health and educational TV broadcasting

    NASA Technical Reports Server (NTRS)

    Thole, J. M.; Dornbrand, H.

    1974-01-01

    The primary objective of the ATS-6 is to demonstrate the feasibility of operating a high-powered geosynchronous communications satellite capable of relaying color TV and other high-quality signals on multiple frequencies to relatively simple and inexpensive ground receivers. Other capabilities include providing a link between ships, aircraft, or other earth satellites (e.g., low-orbit meteorological satellites) and the ground. The ATS-6 flight-objective accomplishments and subsystem performance for its first 30 days in orbit are summarized. Success is predicted for most of the experiments carried.

  4. NASA's Space Launch System: Progress Toward the Proving Ground

    NASA Technical Reports Server (NTRS)

    Jackman, Angie; Johnson, Les

    2017-01-01

    With significant and substantial progress being accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and together with the Orion spacecraft will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. This paper will provide a description of the SLS vehicle, and an overview of the vehicle's capabilities and utilization potential.

  5. Using the nursing process to implement a Y2K computer application.

    PubMed

    Hobbs, C F; Hardinge, T T

    2000-01-01

    Because of the coming year 2000, the need was assessed to upgrade the order entry system at many hospitals. At Somerset Medical Center, a training team divided the transition into phases and used a modified version of the nursing process to implement the new program. The entire process required fewer than 6 months and was relatively problem-free. This successful transition was aided by the nursing process, training team, and innovative educational techniques.

  6. Three-Dimensional Dynamic Analyses of Track-Embankment-Ground System Subjected to High Speed Train Loads

    PubMed Central

    2014-01-01

    A three-dimensional finite element model was developed to investigate dynamic response of track-embankment-ground system subjected to moving loads caused by high speed trains. The track-embankment-ground systems such as the sleepers, the ballast, the embankment, and the ground are represented by 8-noded solid elements. The infinite elements are used to represent the infinite boundary condition to absorb vibration waves induced by the passing of train load at the boundary. The loads were applied on the rails directly to simulate the real moving loads of trains. The effects of train speed on dynamic response of the system are considered. The effect of material parameters, especially the modulus changes of ballast and embankment, is taken into account to demonstrate the effectiveness of strengthening the ballast, embankment, and ground for mitigating system vibration in detail. The numerical results show that the model is reliable for predicting the amplitude of vibrations produced in the track-embankment-ground system by high-speed trains. Stiffening of fill under the embankment can reduce the vibration level, on the other hand, it can be realized by installing a concrete slab under the embankment. The influence of axle load on the vibration of the system is obviously lower than that of train speed. PMID:24723838

  7. Three-dimensional dynamic analyses of track-embankment-ground system subjected to high speed train loads.

    PubMed

    Fu, Qiang; Zheng, Changjie

    2014-01-01

    A three-dimensional finite element model was developed to investigate dynamic response of track-embankment-ground system subjected to moving loads caused by high speed trains. The track-embankment-ground systems such as the sleepers, the ballast, the embankment, and the ground are represented by 8-noded solid elements. The infinite elements are used to represent the infinite boundary condition to absorb vibration waves induced by the passing of train load at the boundary. The loads were applied on the rails directly to simulate the real moving loads of trains. The effects of train speed on dynamic response of the system are considered. The effect of material parameters, especially the modulus changes of ballast and embankment, is taken into account to demonstrate the effectiveness of strengthening the ballast, embankment, and ground for mitigating system vibration in detail. The numerical results show that the model is reliable for predicting the amplitude of vibrations produced in the track-embankment-ground system by high-speed trains. Stiffening of fill under the embankment can reduce the vibration level, on the other hand, it can be realized by installing a concrete slab under the embankment. The influence of axle load on the vibration of the system is obviously lower than that of train speed.

  8. Flight Simulator Platform Motion and Air Transport Pilot Training

    NASA Technical Reports Server (NTRS)

    Lee, Alfred T.; Bussolari, Steven R.

    1989-01-01

    The influence of flight simulator platform motion on pilot training and performance was examined In two studies utilizing a B-727-200 aircraft simulator. The simulator, located at Ames Research Center, Is certified by the FAA for upgrade and transition training in air carrier operations. Subjective ratings and objective performance of experienced B-727 pilots did not reveal any reliable effects of wide variations In platform motion de- sign. Motion platform variations did, however, affect the acquisition of control skill by pilots with no prior heavy aircraft flying experience. The effect was limited to pitch attitude control inputs during the early phase of landing training. Implications for the definition of platform motion requirements in air transport pilot training are discussed.

  9. Investigation of the Chromosphere-Corona Interface with the Upgraded Very High Angular Resolution Ultraviolet Telescope (VAULT2.0)

    NASA Astrophysics Data System (ADS)

    Vourlidas, Angelos; Beltran, Samuel Tun; Chintzoglou, Georgios; Eisenhower, Kevin; Korendyke, Clarence; Feldman, Ronen; Moser, John; Shea, John; Johnson-Rambert, Mary; McMullin, Don; Stenborg, Guillermo; Shepler, Ed; Roberts, David

    2016-03-01

    Very high angular resolution ultraviolet telescope (VAULT2.0) is a Lyman-alpha (Lyα; 1216Å) spectroheliograph designed to observe the upper chromospheric region of the solar atmosphere with high spatial (<0.5‧‧) and temporal (8s) resolution. Besides being the brightest line in the solar spectrum, Lyα emission arises at the temperature interface between coronal and chromospheric plasmas and may, hence, hold important clues about the transfer of mass and energy to the solar corona. VAULT2.0 is an upgrade of the previously flown VAULT rocket and was launched successfully on September 30, 2014 from White Sands Missile Range (WSMR). The target was AR12172 midway toward the southwestern limb. We obtained 33 images at 8s cadence at arc second resolution due to hardware problems. The science campaign was a resounding success, with all space and ground-based instruments obtaining high-resolution data at the same location within the AR. We discuss the science rationale, instrument upgrades, and performance during the first flight and present some preliminary science results.

  10. A Major Upgrade of the H.E.S.S. Cherenkov Cameras

    NASA Astrophysics Data System (ADS)

    Lypova, Iryna; Giavitto, Gianluca; Ashton, Terry; Balzer, Arnim; Berge, David; Brun, Francois; Chaminade, Thomas; Delagnes, Eric; Fontaine, Gerard; Füßling, Matthias; Giebels, Berrie; Glicenstein, Jean-Francois; Gräber, Tobias; Hinton, Jim; Jahnke, Albert; Klepser, Stefan; Kossatz, Marko; Kretzschmann, Axel; Lefranc, Valentin; Leich, Holger; Lüdecke, Hartmut; Manigot, Pascal; Marandon, Vincent; Moulin, Emmanuel; de Naurois, Mathieu; Nayman, Patrick; Ohm, Stefan; Penno, Marek; Ross, Duncan; Salek, David; Schade, Markus; Schwab, Thomas; Simoni, Rachel; Stegmann, Christian; Steppa, Constantin; Thornhill, Julian; Toussnel, Francois

    2017-03-01

    The High Energy Stereoscopic System (H.E.S.S.) is an array of imaging atmospheric Cherenkov telescopes (IACTs) located in Namibia. It was built to detect Very High Energy (VHE, >100 GeV) cosmic gamma rays, and consists of four 12 m diameter Cherenkov telescopes (CT1-4), built in 2003, and a larger 28 m telescope (CT5), built in 2012. The larger mirror surface of CT5 permits to lower the energy threshold of the array down to 30 GeV. The cameras of CT1-4 are currently undergoing an extensive upgrade, with the goals of reducing their failure rate, reducing their readout dead time and improving the overall performance of the array. The entire camera electronics has been renewed from ground-up, as well as the power, ventilation and pneumatics systems, and the control and data acquisition software. Technical solutions forseen for the next-generation Cherenkov Telescope Array (CTA) observatory have been introduced, most notably the readout is based on the NECTAr analog memory chip. The camera control subsystems and the control software framework also pursue an innovative design, increasing the camera performance, robustness and flexibility. The CT1 camera has been upgraded in July 2015 and is currently taking data; CT2-4 will upgraded in Fall 2016. Together they will assure continuous operation of H.E.S.S at its full sensitivity until and possibly beyond the advent of CTA. This contribution describes the design, the testing and the in-lab and on-site performance of all components of the newly upgraded H.E.S.S. camera.

  11. Coaching Athletics: A Tort Just Waiting for a Judgment?

    ERIC Educational Resources Information Center

    Clear, Delbert K.; Bagley, Martha

    1982-01-01

    Discusses school boards' potential tort liability for sports injuries arising from coaches' lack of knowledge of how to prevent or treat injuries. Argues for board policies requiring that coaches be trained in handling injuries, that their skills be upgraded, and that proper practices be followed. (RW)

  12. UNION-SPONSORED RETRAINING PROGRAMS.

    ERIC Educational Resources Information Center

    HOOS, IDA R.

    UNION-SPONSORED TRAINING PROGRAMS WERE PROVIDED IN THE SAN FRANCISCO BAY AREA TO UPGRADE SKILLS OF MARINE COOKS AND STEWARDS, SHIPS' RADIO OPERATORS, JOURNEYMAN PLUMBERS AND GASFITTERS, AND MEMBERS OF THE INTERNATIONAL BROTHERHOOD OF ELECTRICAL WORKERS (IBEW). THESE PROGRAMS WERE THE ONLY COHESIVE UNION SPONSORED CURRICULA IN THAT AREA. MAJOR…

  13. Directory of Accredited Private Home Study Schools: 1974.

    ERIC Educational Resources Information Center

    National Home Study Council, Washington, DC.

    With home study, subjects inaccessible locally become available. Useful aids in career development, many courses are offered: business, skilled trades, preparation for professional licenses, profitable hobbies, and academic subjects. Many courses provide complete vocational training, as well as the upgrading of job skills. The directory offers a…

  14. 20 CFR 665.210 - What are allowable Statewide workforce investment activities?

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 20 Employees' Benefits 3 2011-04-01 2011-04-01 false What are allowable Statewide workforce investment activities? 665.210 Section 665.210 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... assist in skills upgrading; and (2) Programs targeted to Empowerment Zones and Enterprise Communities. (e...

  15. 20 CFR 665.210 - What are allowable Statewide workforce investment activities?

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 20 Employees' Benefits 4 2014-04-01 2014-04-01 false What are allowable Statewide workforce investment activities? 665.210 Section 665.210 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... loan program to assist in skills upgrading; and (2) Programs targeted to Empowerment Zones and...

  16. 20 CFR 665.210 - What are allowable Statewide workforce investment activities?

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 20 Employees' Benefits 4 2012-04-01 2012-04-01 false What are allowable Statewide workforce investment activities? 665.210 Section 665.210 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... loan program to assist in skills upgrading; and (2) Programs targeted to Empowerment Zones and...

  17. 20 CFR 665.210 - What are allowable Statewide workforce investment activities?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What are allowable Statewide workforce investment activities? 665.210 Section 665.210 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... assist in skills upgrading; and (2) Programs targeted to Empowerment Zones and Enterprise Communities. (e...

  18. 20 CFR 665.210 - What are allowable Statewide workforce investment activities?

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 20 Employees' Benefits 4 2013-04-01 2013-04-01 false What are allowable Statewide workforce investment activities? 665.210 Section 665.210 Employees' Benefits EMPLOYMENT AND TRAINING ADMINISTRATION... loan program to assist in skills upgrading; and (2) Programs targeted to Empowerment Zones and...

  19. Modernization of the Caltech/USGS Southern California Seismic Network

    NASA Astrophysics Data System (ADS)

    Bhadha, R.; Devora, A.; Hauksson, E.; Johnson, D.; Thomas, V.; Watkins, M.; Yip, R.; Yu, E.; Given, D.; Cone, G.; Koesterer, C.

    2009-12-01

    The USGS/ANSS/ARRA program is providing Government Furnished Equipment (GFE), and two year funding for upgrading the Caltech/USGS Southern California Seismic Network (SCSN). The SCSN is the modern digital ground motion seismic network in southern California that monitors seismicity and provides real-time earthquake information products such as rapid notifications, moment tensors, and ShakeMap. The SCSN has evolved through the years and now consists of several well-integrated components such as Short-Period analog, TERRAscope, digital stations, and real-time strong motion stations, or about 300 stations. In addition, the SCSN records data from about 100 stations provided by partner networks. To strengthen the ability of SCSN to meet the ANSS performance standards, we will install GFE and carry out the following upgrades and improvements of the various components of the SCSN: 1) Upgrade of dataloggers at seven TERRAscope stations; 2) Upgrade of dataloggers at 131 digital stations and upgrade broadband sensors at 25 stations; 3) Upgrade of SCSN metadata capabilities; 4) Upgrade of telemetry capabilities for both seismic and GPS data; and 5) Upgrade balers at stations with existing Q330 dataloggers. These upgrades will enable the SCSN to meet the ANSS Performance Standards more consistently than before. The new equipment will improve station uptimes and reduce maintenance costs. The new equipment will also provide improved waveform data quality and consequently superior data products. The data gaps due to various outages will be minimized, and ‘late’ data will be readily available through retrieval from on-site storage. Compared to the outdated equipment, the new equipment will speed up data delivery by about 10 sec, which is fast enough for earthquake early warning applications. The new equipment also has about a factor of ten lower consumption of power. We will also upgrade the SCSN data acquisition and data center facilities, which will improve the SCSN performance and metadata availability. We will improve existing software to facilitate the update of metadata, and to improve the interoperability between SeisNetWatch and our database of metadata. The improved software will also be made available to other regional networks as part of the CISN software distribution. These upgrades, will greatly improve the robustness of the SCSN, and facilitate higher quality and more reliable earthquake monitoring than was available before in southern California. The modernized SCSN will contribute to more coordinated search and rescue as well as economic resilience following a major earthquake by providing accurate earthquake information, and thus facilitate rapid deployment of field crews and rapid business resumption. Further, advances in seismological research will be facilitated by the high quality seismic data that will be collected in one of the most seismically active areas in the contiguous US.

  20. Modification of the Electromagnetic Levitator (EML) Hardware

    NASA Technical Reports Server (NTRS)

    Frost, R. T.

    1985-01-01

    The goals of this project are: (1) to study the upgrade requirements and approaches needed for incorporation of an Electromagnetic Levitator (EML) into the shuttle orbiter, (2) to work with members of the Electromagnetic Containerless Processing science working group (SWG) to define future experiments for the EML, and (3) to assist these investigators in further development of ground-based experiment techniques to the limits possible in the terrestrial gravitational environment. Present work is directed toward: (1) upgrading the EML flight apparatus to meet requirements of safety and integration interfaces with the MSL orbiter carrier, (2) development of new experiment components required to carry out approved experiments in undercooled solidification and associated fluid flow studies directed by MIT, and (3) construction, test, qualification and integration assistance for the EML MSL flight package.

  1. Operation Upgrade: An In-Service Training Program to Supplement the Development of a Curriculum for the Multi-Racial Schools in New York City to the End That Intergroup Relations May Be Improved.

    ERIC Educational Resources Information Center

    Lloyd, Helene M.

    An inservice training program was conducted by the New York City Board of Education in a school district in the South Bronx section of the city with an ethnic minority pupil population of 68 percent. The objectives were to improve intergroup relations, to help teachers to respond positively to problems posed by desegregation, and to gain parent…

  2. Active Component Responsibility in Reserve Component Pre- and Postmobilization Training

    DTIC Science & Technology

    2015-01-01

    XI as part of the Army Posture Statement, including a comparison of the promotion rates of officers assigned as AC advisers with those of all other...reflect true equipping posture , a tendency to upgrade rat- ings as reports move up the chain of command, and an inability to link funding to changes in...with our aviation force. … [W] hen we say we need to train the tank crews on simulators, we have got to make sure those things are there. (U.S. House of

  3. O merah po dal'nejsemu ulucseniju podgotovki kvalificirovannyh rabocih v ucebnyh zavedenijah sistemy professional'no-tehniceskogo obrazovanija (Decree Concerning Measures for Further Improvement of the Training of Skilled Workers in the Establishments of the Vocational and Technical Education System) (April 2, 1969).

    ERIC Educational Resources Information Center

    Communist Party of the Soviet Union, Moscow. Central Committee.

    This document is an English-language abstract (approximately 1,500 words) of a decree issued by the Soviet Government to upgrade the system of vocational and industrial training in the USSR. It claims that vocational and technical educational establishments should gradually be transformed into vocational-technical colleges offering a 3-4 year…

  4. Business-Industry-Labor Involvement in Lifelong Vocational-Technical Education.

    ERIC Educational Resources Information Center

    Warmbrod, Catharine P.

    The knowledge explosion dramatizes the need for education throughout peoples' lives, while technological change in particular fuels business, industry, and labor's imperative to cooperate closely with education to prepare people for work. In order to obtain the training, retraining, upgrading, and recycling of persons and skills, changes in work…

  5. Designing Continuous Professional Development Programmes for Teachers: A Literature Review

    ERIC Educational Resources Information Center

    Luneta, K.

    2012-01-01

    Continuous professional development is essential for upgrading and updating teachers because the rate of social and educational change makes pre-service training an inadequate basis for long term professional competence. The design of these continuous professional development programmes must be informed by an effective needs analysis that…

  6. Advanced gas turbines breathe new life into vintage reheat units

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1994-04-01

    This article describes the repowering of reheat units with advanced gas turbines. The topics of the article include a project overview, plant configuration including heat recovery steam generators and the plant-wide distributed control system, upgrade of existing steam turbines, gas turbine technology, reliability, availability, maintenance features, and training.

  7. Strengthening the Workforce in Better Buildings Neighborhoods

    ScienceCinema

    Sperling, Gil; Adams, Cynthia; Fiori, Laura; Penzkover, Dave; Wood, Danny; Farris, Joshua

    2018-05-01

    The Better Buildings Neighborhood Program is supporting an expanding energy efficiency workforce upgrading buildings in communities around the country. Contractors are being trained and have access to additional job opportunities, spurring local economic growth while helping Americans use less energy, save money, and be more comfortable in their homes and other buildings.

  8. Changing Lives through Lifelong Learning Accounts

    ERIC Educational Resources Information Center

    Council for Adult and Experiential Learning (NJ1), 2007

    2007-01-01

    As conceived by the Council for Adult and Experiential Learning (CAEL), Lifelong Learning Accounts (LiLAs[SM]) are employer-matched, portable individual accounts used to finance employee education and training. They provide employees with an affordable means of upgrading their skills and knowledge, while helping to meet the needs of employers and…

  9. 20 CFR 663.705 - What are the requirements for OJT contracts for employed workers?

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 20 Employees' Benefits 3 2010-04-01 2010-04-01 false What are the requirements for OJT contracts for employed workers? 663.705 Section 663.705 Employees' Benefits EMPLOYMENT AND TRAINING... production or service procedures, upgrading to new jobs that require additional skills, workplace literacy...

  10. Industrial Arts Curriculum Guide for Safety.

    ERIC Educational Resources Information Center

    Connecticut State Dept. of Education, Hartford. Div. of Vocational Education.

    This guide is intended to draw attention to the necessity for safety education in every aspect of industrial arts and to provide resources for upgrading and improving safety instruction in the classroom. It also can be used for inservice training of industrial art teachers and for undergraduate teacher education in Connecticut. Introductory…

  11. Central California Action Associates, Inc.

    ERIC Educational Resources Information Center

    Sortor, Maia, Comp.

    The overall goal of the Central California Action Associates Inc. (CCAA) program is to provide basic education and pre-vocational training so that migrant and seasonal adult farm workers will be able to upgrade their economic and social lives. Without increased educational attainment, the San Joaquin Valley farm workers face a grim future because…

  12. Revitalizing Battle Staff Training

    DTIC Science & Technology

    1999-12-01

    be confused with true conditional text as implemented in FrameMaker or Ventura. • PageMaker’s® core composition engine has not been upgraded. You...is a little worn around the edges. For the most part, PageMaker® leaves document-wide functions to its sibling program, FrameMaker . • Without an

  13. Health Care Industry. Workforce & Workplace Literacy Series.

    ERIC Educational Resources Information Center

    BCEL Brief, 1991

    1991-01-01

    This brief gives an overview of the topic of workplace literacy in the health care industry and lists program contacts. The following 35 organizations operate basic skills upgrading programs for health care workers: American Hospital Association; Chinese American Civic Association; Massachusetts Department of Employment and Training; BostonWorks;…

  14. Method for upgrading the performance at track transitions for high-speed service : next generation high-speed rail program

    DOT National Transportation Integrated Search

    2001-09-01

    High-speed trains in the speed range of 100 to 160 mph require tracks of nearly perfect geometry and mechanical uniformity, when subjected to moving wheel loads. Therefore, this report briefly describes the remedies being used by various railroads to...

  15. Questions to Answer before You Branch out on a CD-ROM Network.

    ERIC Educational Resources Information Center

    Simpson, Carol Mann

    1992-01-01

    Examines issues that librarians must address when purchasing databases on CD-ROM for networking. Highlights include network licenses; costs; restrictions on network rights; ownership of CD-ROMs; hardware requirements; fees for upgrading software; CD-ROM servers; pricing options; training materials; and disk drives. (LRW)

  16. Professional Development for Teachers: What Two Rigorous Studies Tell Us

    ERIC Educational Resources Information Center

    Quint, Janet

    2011-01-01

    Professional development--formal in-service training to upgrade the content knowledge and pedagogical skills of teachers--is widely viewed as an important means of improving teaching and learning. While many interventions "include" professional development, professional development was the central intervention of the two recent research and…

  17. Vocational Education Tool and Equipment Inventory.

    ERIC Educational Resources Information Center

    Lewis, James P.; Burrows, Robert T.

    This study was conducted to provide information on equipment needs, the extent of planning to upgrade equipment, and technological advancements necessary to continue providing quality training to entry-level students and incumbent workers. The results were based on a 98 percent return from 72 area vocational-technical school directors, 17…

  18. THE NEW MEDIA--MEMO TO EDUCATIONAL PLANNERS.

    ERIC Educational Resources Information Center

    SCHRAMM, WILBUR; AND OTHERS

    THIS STUDY REVIEWS THE EDUCATIONAL USES, EFFECTIVENESS AND COSTS OF THE NEW MEDIA (RADIO, TELEVISION, PROGRAMED LEARNING, CORRESPONDENCE STUDY, AND FILMS AND AUDIO-VISUAL AIDS) AND MAKES SUGGESTIONS TOWARDS THEIR EFFECTIVE USE IN EDUCATION. NEW MEDIA HAVE BEEN USED FOR UPGRADING INSTRUCTION, TEACHER TRAINING, EXTENSION OF EDUCATION, LITERACY AND…

  19. The upgrade system of BESIII ETOF with MRPC technology

    NASA Astrophysics Data System (ADS)

    Wang, X. Z.; Sun, Y. J.; Li, C.; Heng, Y. K.; Wu, Z.; Cao, P.; Dai, H. L.; Ji, X. L.; Gong, W. X.; Liu, Z.; Luo, X. L.; Sun, W. J.; Wang, S. Y.; Wang, Y.; Yang, R. X.; Ye, M.; Zhao, J. L.

    2016-08-01

    An upgrade, based on Multigap Resistive Plate Chamber (MRPC) technology, of the endcap Time-Of-Flight (ETOF) detector of the Beijing Spectrometer III (BESIII) has been proposed for the replacement of the current scintillator + PMT based ETOF, with the aim of improving the time resolution down to 80 ps sigma. This improvement will enhance the particle identification capability to meet the higher precision requirements of physics. The ETOF system including MRPC modules, Front End Electronics (FEE), CLOCK module, fast control boards and Time to Digital modules (TDIG), has been designed, constructed and parts of the ETOF system have seperately tested. Aiming at examining the quality of entire ETOF system and training the operation of all participated instruments, a cosmic ray test system was built and tested in the laboratory for about three months to guarantee the performance. In this paper the results of the test are presented indicating that the entire ETOF system works well and satisfies the requirements of the upgrade.

  20. NPOESS C3S Expandability: SafetyNetTM and McMurdo Improvements

    NASA Astrophysics Data System (ADS)

    Jamilkowski, M. L.; Paciaroni, J.; Pela, F.

    2010-12-01

    The National Oceanic & Atmospheric Administration (NOAA), Department of Defense (DoD), and National Aeronautics & Space Administration (NASA) are jointly acquiring the next-generation weather & environmental satellite system; the National Polar-orbiting Operational Environmental Satellite System (NPOESS). NPOESS replaces the current NOAA Polar-orbiting Operational Environmental Satellites (POES) and Dod's Defense Meteorological Satellite Program (DMSP). The NPOESS satellites carry a suite of sensors that collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The command & telemetry portion of NPOESS is the Command, Control and Communications Segment (C3S), developed by Raytheon Intelligence & Information Systems. C3S is responsible for managing the overall NPOESS mission from control and status of the space and ground assets to ensuring delivery of timely, high quality data from the Space Segment (SS) to the Interface Data Processing Segment (IDPS) for processing. In addition, the C3S provides the globally distributed ground assets necessary to collect and transport mission, telemetry, and command data between the satellites and the processing locations. The C3S provides all functions required for day-to-day commanding & state-of-health monitoring of the NPP & NPOESS satellites, and delivery of Stored Mission Data (SMD) to each US Weather Central Interface Data Processor (IDP) for data products development and transfer to System subscribers. The C3S also monitors and reports system-wide health and status & data communications with external systems and between NPOESS segments. Two crucial elements of NPOESS C3S expandability are SafetyNetTM and communications improvements to McMurdo Station, Antarctica. SafetyNetTM is a key feature of NPOESS and a vital element of the C3S and Northrop Grumman Aerospace Systems patented data collection architecture. The centerpiece of SafetyNetTM is the system of fifteen globally-distributed ground receptors developed by Raytheon Company. These antennae will collect up to five times as much environmental data approximately four times faster than current polar-orbiting weather satellites. Once collected, these data will be forwarded near-instantaneously to US weather centrals via the global fiber optic network for processing in environmental prediction models. In January 2008, Raytheon Company achieved a significant milestone for the NPOESS program by successfully completing the first phase of a major communications upgrade for Antarctica. The upgrade of the off-continent satellite communications link at McMurdo Station more than tripled the bandwidth available for scientific research, weather prediction, and health & safety of those stationed at McMurdo. The project is part of the company’s C3S under development for NPOESS. This upgrade paves the way for a second major communications upgrade planned for 2012 in preparation for the use of McMurdo Station as one of the 15 NPOESS ground stations worldwide that will be receiving environmental data collected by the NPOESS satellites. SafetyNet is a trademark of Northrop Grumman Aerospace Systems.

  1. Perceptual Training and Figure-Ground Performance in Low Vision.

    ERIC Educational Resources Information Center

    Trudeau, M.; And Others

    1990-01-01

    Twenty-five older adults with age-related macular degeneration were separated into one of three groups: in-clinic training, take-home-training, or no-training. After testing, results showed that the ability to distinguish figure from ground is an improvable skill with the take-home group improving the most. (Author/DB)

  2. Building America Case Study: Rehabilitation of USDA Multifamily Homes, Georgia (Climate Zones 2-4)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rea Ventures Group, LLC, (Rea Ventures) partnered with Southface Energy Institute (Southface) on the rehabilitation of 418 low-income rental multifamily apartments located at 14 different properties in Georgia (Climate Zones 2-4). These 22-year old, individually-metered units were arranged in rowhouse or townhouse style units. Rehabilitation plans were developed using a process prescribed by the US Department of Agriculture (USDA) Rural Development program, who partially funded the building upgrades. The USDA is responsible for building, upgrading, and subsidizing housing in rural areas nationwide. In 2012, over $100 million was allocated in grants and loans. Due to the unique financing mechanism asmore » well as long-term ownership requirements, property owners are especially motivated to invest in upgrades that will increase durability and tenant retention. These buildings represent a large stock of rural affordable housing that have the potential for significant energy and cost savings for property owners and tenants. Southface analyzed the energy upgrade potential of one stereotypical property in the Rea Ventures portfolio. This study will provide insight into the most cost-effective, implementable energy efficiency and durability upgrades for this age multifamily housing, having an enormous impact not only on the portfolio of Rea Ventures but on the vast USDA and larger Federal portfolio. Additionally, Southface will identify gaps in the current capital needs assessment process, examine available audit and simulation tools and protocols, and evaluate additional auditor training or certification needs.« less

  3. Radiometric calibration of an airborne multispectral scanner. [of Thematic Mapper Simulator

    NASA Technical Reports Server (NTRS)

    Markham, Brian L.; Ahmad, Suraiya P.; Jackson, Ray D.; Moran, M. S.; Biggar, Stuart F.; Gellman, David I.; Slater, Philip N.

    1991-01-01

    The absolute radiometric calibration of the NS001 Thematic Mapper Simulator reflective channels was examined based on laboratory tests and in-flight comparisons to ground measurements. The NS001 data are calibrated in-flight by reference to the NS001 internal integrating sphere source. This source's power supply or monitoring circuitry exhibited greater instability in-flight during 1988-1989 than in the laboratory. Extrapolating laboratory behavior to in-flight data resulted in 7-20 percent radiance errors relative to ground measurements and atmospheric modeling. Assuming constancy in the source's output between laboraotry and in-flight resulted in generally smaller errors. Upgrades to the source's power supply and monitoring circuitry in 1990 improved its in-flight stability, though in-flight ground reflectance based calibration tests have not yet been performed.

  4. Placing learning needs in context: distance learning for clinical officers in Tanzania.

    PubMed

    Brigley, Stephen; Hosein, Ian; Myemba, Irnei

    2009-04-01

    Poor public health indicators in Tanzania have led to the upgrading of nursing and clinical personnel who currently have just core training. Clinical officers (COs) have 3 years training in basic and applied medicine and are responsible for healthcare of large and dispersed rural populations. UNESCO-Wales has funded colleagues in Wales (UK) to assist the upgrade of COs. An inquiry into their learning needs and the Tanzanian context has produced a framework for design of a module for COs on sexually transmissible infections and HIV & AIDS by distance learning. Face-to-face discussions were held with the Ministry of Health, healthcare workers, educators and administrators in Tanzania; a review of training documents was carried out; and a follow-up questionnaire issued to COs. The discussions and review highlighted teacher-centred approaches, and management, infrastructure and resources obstacles to curriculum change. Principal learning needs of COs around STIs were: counselling, syndromic management, drugs management, laboratory diagnosis, health education, resources, staffing and service morale. Placing learning needs in context in dialogue with Tanzanian colleagues was an advance on simple transfer of educational technologies and expertise. The inquiry resulted in a draft study guide and resources pack that were positively reviewed by Tanzanian tutors. Management and resources issues raised problems of sustainability in the module implementation.

  5. Space Shuttle Projects

    NASA Image and Video Library

    2002-03-01

    Carrying a crew of seven, the Space Shuttle Orbiter Columbia soared through some pre-dawn clouds into the sky as it began its 27th flight, STS-109. Launched March 1, 2002, the goal of the mission was the maintenance and upgrade of the Hubble Space Telescope (HST). The Marshall Space Flight Center had the responsibility for the design, development, and construction of the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit. The HST detects objects 25 times fainter than the dimmest objects seen from Earth and provides astronomers with an observable universe 250 times larger than is visible from ground-based telescopes, perhaps as far away as 14 billion light-years. The HST views galaxies, stars, planets, comets, possibly other solar systems, and even unusual phenomena such as quasars, with 10 times the clarity of ground-based telescopes. During the STS-109 mission, the telescope was captured and secured on a work stand in Columbia's payload bay using Columbia's robotic arm. Here four members of the crew performed five spacewalks completing system upgrades to the HST. Included in those upgrades were: replacement of the solar array panels; replacement of the power control unit (PCU); replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near-Infrared Camera and Multi-object Spectrometer (NICMOS), which had been dormant since January 1999 when it original coolant ran out. Lasting 10 days, 22 hours, and 11 minutes, the STS-109 mission was the 108th flight overall in NASA's Space Shuttle Program.

  6. Workers Welding on ML

    NASA Image and Video Library

    2014-02-24

    CAPE CANAVERAL, Fla. – Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. A construction worker prepares a metal beam that will be attached to the ML. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program office at Kennedy. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first mission, Exploration Mission 1, in 2017. Photo credit: NASA/Dimitri Gerondidakis

  7. KSC-2014-2018

    NASA Image and Video Library

    2014-04-04

    CAPE CANAVERAL, Fla. – Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. A construction worker uses a measuring device on the surface of the ML. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program office at Kennedy. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first mission, Exploration Mission 1, in 2017. Photo credit: NASA/Cory Huston

  8. A Preliminary Economic Evaluation of Marine Corps Acquisition Practices: UHF Satellite Communication Ground Terminal Acquisitions

    DTIC Science & Technology

    1989-03-01

    34 Replace outdated teletypewriter/printer technology with the four AN/ UGC - 74’s; " Upgrade communication security (COMSEC) equipment to retain...unbiased information. In fact, the private user recognizes that good marketing techniques are required to receive favorable consideration for a private...developed in accounting, finance, economics, marketing , political science, sociology, and organizational behavior literature. "[The principal-agent

  9. MIT Lincoln Laboratory Facts 2015

    DTIC Science & Technology

    2015-01-01

    this technology to industry for deployment in operational systems. Current efforts focus on radio - frequency (RF) military satellite communications ... frequency submarine communications demonstration ■■ Continuous-wave diode laser developed in InGaAsP/InP alloy ■■ Ground-based Electro-Optical Deep...Radar upgrade ■■ Miniaturized radio - frequency receiver ■■ Missile Alternative Range Target Instrument payloads ■■ Multifunction phased array radar

  10. Issues related to line-oriented flight training

    NASA Technical Reports Server (NTRS)

    Lauber, J. K.

    1981-01-01

    The use of a training simulator along with carefully structured, detailed, line trip scenarios was envisioned by NASA as a means of providing a controllable, repeatable way to observe line crews in a highly realistic simulation of their working environment and obtain better understanding operationally significant human factors problems and issues. Relevant research done by the agency and the results of full-mission simulation scenarios revealed potential implications for flight training. Aspects to be considered in creating training programs closely related to the actual line environment with a total crew application in real world incident experiences include: (1) operational, environmental, equipment, and crew problems in scenario design; (2) real time line oriented flight training operation; (3) performance assessment and debriefing; (4) instructor qualification and training; and (5) other issues such as ub un initial, transition, and upgrade training; procedures developent and evaluation, and equipment evaluation.

  11. AFRL Advanced Electric Lasers Branch - Construction and Upgrade of a 50-watt Facility-Class Sodium Guidestar Pump Laser

    NASA Astrophysics Data System (ADS)

    Bronder, T.; Miller, H.; Stohs, J.; Lu, C.; Baker, J.; Lucero, A.

    The development of a reliable and effective laser source for pumping mesospheric sodium to generate an artificial guidestar has been well documented. From the early achievements with 589nm high-power dye lasers at the Keck and Lick observatories to the ground-breaking 50W CW FASOR (Frequency Addition Source of Optical Radiation) Guidestar at the Air Forces Starfire Optical Range (SOR), there has been intense interest in this technology from both the academic and military communities. Beginning in the fall of 2008, the Air Force Research Laboratorys Advanced Electric Lasers Branch began a project to build, test, verify and deliver an upgraded version of the SOR FASOR for use at the AF Maui Optical Station (AMOS) in the summer of 2010. This FASOR will be similar in design to the existing SOR device and produce 50W of diffraction limited, linearly polarized narrow linewidth 589nm light by combining the output of two injection-locked Nd:YAG ring lasers (operating at 1064nm and 1319nm) using resonant sum-frequency generation in a lithium triborate crystal (LBO). The upgraded features will include modularized sub-components, embedded control electronics, and a simplified cooling system. The first portion of this upgrade project is to reconstruct the current SOR FASOR components and include improved methods of regulating the gain modules of the two injection lasers. In parallel with this effort, the technical plans for the modularization and re-packaging of the FASOR will be finalized and coordinated with the staff at Maui. This presentation will summarize the result of these efforts to date and provide updates on the AMOS FASOR status. Additionally, plans for "next-generation" FASOR upgrades for both SOR and AMOS will also be discussed.

  12. Infrastructure for Training and Partnershipes: California Water and Coastal Ocean Resources

    NASA Technical Reports Server (NTRS)

    Siegel, David A.; Dozier, Jeffrey; Gautier, Catherine; Davis, Frank; Dickey, Tommy; Dunne, Thomas; Frew, James; Keller, Arturo; MacIntyre, Sally; Melack, John

    2000-01-01

    The purpose of this project was to advance the existing ICESS/Bren School computing infrastructure to allow scientists, students, and research trainees the opportunity to interact with environmental data and simulations in near-real time. Improvements made with the funding from this project have helped to strengthen the research efforts within both units, fostered graduate research training, and helped fortify partnerships with government and industry. With this funding, we were able to expand our computational environment in which computer resources, software, and data sets are shared by ICESS/Bren School faculty researchers in all areas of Earth system science. All of the graduate and undergraduate students associated with the Donald Bren School of Environmental Science and Management and the Institute for Computational Earth System Science have benefited from the infrastructure upgrades accomplished by this project. Additionally, the upgrades fostered a significant number of research projects (attached is a list of the projects that benefited from the upgrades). As originally proposed, funding for this project provided the following infrastructure upgrades: 1) a modem file management system capable of interoperating UNIX and NT file systems that can scale to 6.7 TB, 2) a Qualstar 40-slot tape library with two AIT tape drives and Legato Networker backup/archive software, 3) previously unavailable import/export capability for data sets on Zip, Jaz, DAT, 8mm, CD, and DLT media in addition to a 622Mb/s Internet 2 connection, 4) network switches capable of 100 Mbps to 128 desktop workstations, 5) Portable Batch System (PBS) computational task scheduler, and vi) two Compaq/Digital Alpha XP1000 compute servers each with 1.5 GB of RAM along with an SGI Origin 2000 (purchased partially using funds from this project along with funding from various other sources) to be used for very large computations, as required for simulation of mesoscale meteorology or climate.

  13. Using Pedagogical Dialogue as a Vehicle to Encourage Faculty Technology Use

    ERIC Educational Resources Information Center

    Friel, Terri; Britten, Jody; Compton, Beverly; Peak, Amy; Schoch, Kurt; VanTyle, W. Kent

    2009-01-01

    The pace of technology adoption by university faculty is often slow. Slow faculty technology adoption may result from fear of failure, disinterest, or aversion to change. However, in 2007 we experienced a different faculty response while training faculty for technology-enhanced teaching at Butler University. During a technology upgrade of…

  14. Project T.E.A.M. (Technical Education Advancement Modules). Fundementals of Workplace Integration.

    ERIC Educational Resources Information Center

    Kraeling, Vicki

    This module is one of a series of instructional guides developed by Project TEAM (Technical Education Advancement Modules), a cooperative demonstration program for high technology training for unemployed, underemployed, and existing industrial employees whose basic technical skills are in need of upgrading. The module is a 27-hour overview course…

  15. District 1199C Training & Upgrading Fund. A Manual for Union-Management Educational Partnerships.

    ERIC Educational Resources Information Center

    Ryan, James T.

    This manual provides guidelines for developing and implementing employee educational programs with the cooperation of unions and management. It establishes the need for such programs by explaining the current and future demographics of the workplace, then suggests ways to determine the need for education in any particular company. Information…

  16. The Economy, Productivity, and Training--A CEO's View. Occasional Paper No. 88.

    ERIC Educational Resources Information Center

    Frey, Donald N.

    The way resources are deployed to educate Americans will affect, as never before, productivity, the economy, and the quality of life. To maintain the present standard of living, Americans will be dependent on a continuous infusion of scientific breakthroughs and productivity-enhancing technology. Periodic upgrading of skills will be a necessity…

  17. Use of Distance Education by Christian Religion to Train, Edify and Educate Adherents

    ERIC Educational Resources Information Center

    Satyanarayana, P.; DK Meduri, Emmanuel

    2013-01-01

    Distance Education has been growing fast, in a marvelously diverse fashion. The efficiency, effectiveness, validity and utility of distance teaching-learning are on increase. All communities and religious groups are making use of distance learning methodology to upgrade their knowledge, skills and attitudes. Christian educational institutions in…

  18. STENOGRAPHIC, SECRETARIAL, AND RELATED OCCUPATIONS, A SUGGESTED CURRICULA GUIDE.

    ERIC Educational Resources Information Center

    Bureau of Adult, Vocational, and Technical Education (DHEW/OE), Washington, DC. Div. of Vocational and Technical Education.

    THE PURPOSE OF THIS GUIDE IS TO ASSIST THOSE INVOLVED IN ADMINISTERING FULL-TIME, PART-TIME, REFRESHER AND UPGRADING, AND MANPOWER DEVELOPMENT AND TRAINING PROGRAMS IN STENOGRAPHIC, SECRETARIAL, AND RELATED OFFICE OCCUPATIONS IN HIGH SCHOOLS, POST-SECONDARY, AND SPECIAL SCHOOLS. IT WAS PREPARED BY C.E. LESLIE AND ASSOCIATES UNDER CONTRACTUAL…

  19. Meeting the Teacher Shortage Head On.

    ERIC Educational Resources Information Center

    Vollmer, Marian L.; And Others

    The University of Pittsburgh has exerted concerted efforts to attract and retain liberal arts majors in teacher education, and insure high caliber graduates from its training program. One such program geared to upgrading the professional quality of its graduates is the Master of Arts in Teaching (MAT) program at the University's laboratory school.…

  20. Reforming system of professional training of future specialists by taking into account production automation requirements

    NASA Astrophysics Data System (ADS)

    Saigushev, N. Y.; Vedeneeva, O. A.; Melekhova, Yu B.

    2018-05-01

    The accelerating scientific development, equipment upgrade, emergence of new technologies and intensive growth and use of nano-, robotic, bio- and other perspective technologies require the formation of scientific and technological potential in Russia which is suitable for present-day challenges of the global technological growth.

  1. Investing in Florida's Economy. Florida's School-to-Work Continuum. Second Edition.

    ERIC Educational Resources Information Center

    Florida State Dept. of Education, Tallahassee. Div. of Vocational, Adult, and Community Education.

    This booklet describes programs designed to offer a comprehensive system to improve Florida's work force. Through these programs, students and workers in Florida are prepared to enter the labor force, attend technical training programs, enroll in other postsecondary programs, or upgrade their skills on the job. The following are discussed: the…

  2. THE COMMUNITY-APPRENTICESHIP PROGRAM, A FEASIBILITY STUDY.

    ERIC Educational Resources Information Center

    ISAACK, THOMAS S.

    A STUDY WAS CONDUCTED TO EXAMINE THE FEASIBILITY OF ESTABLISHING COMMUNITY APPRENTICESHIP PROGRAMS IN WEST VIRGINIA. THE CONCEPT IS THAT A WORKER IN ONE COMPANY WOULD UNDERTAKE ON THE JOB TRAINING AT ANOTHER COMPANY TO TAKE ADVANTAGE OF MACHINES AND EQUIPMENT NOT CURRENTLY OWNED BY HIS COMPANY. THE AUTHOR STATES THAT THIS WOULD UPGRADE THE WORK…

  3. Polyvalent Adult Education Centre (An Integrated Approach to Adult Education for Workers).

    ERIC Educational Resources Information Center

    Koshy, T. A.; And Others

    A project to upgrade the vocational skills of Indian workers is presented. This project is designed to plan and develop integrated educational and training courses of various duration for workers and prospective workers, through the establishment of Polyvalent Centers. These centers are institutions providing opportunity for many-sided education…

  4. AUTOMOTIVE SERVICE SPECIALIST, A SUGGESTED GUIDE FOR A TRAINING COURSE.

    ERIC Educational Resources Information Center

    OETTMEIER, ARTHUR J.; AND OTHERS

    THE PURPOSE OF THIS TEACHING GUIDE IS TO SERVE AS A REFERENCE AND COURSE OUTLINE FOR THE INSTRUCTOR. IT WAS DEVELOPED BY A COLLEGE AUTOMOTIVE DEPARTMENT HEAD AND REPRESENTATIVES OF AUTOMOTIVE SERVICE INDUSTRIES, PETROLEUM INDUSTRIES, AND GARAGES. THIS COURSE IS ADAPTABLE TO PREPARATORY, UPGRADING, OR RETRAINING PURPOSES. UNITS ARE SERVICE…

  5. Crash Victim Extrication Training Course: Emergency Medical Technician; Course Guide.

    ERIC Educational Resources Information Center

    National Highway Traffic Safety Administration (DOT), Washington, DC.

    The goal of the National Highway Traffic Safety Administration Department of Transportation has been to upgrade and professionalize the ambulance field, enhance its life-sustaining quality, and encourage its establishment where it does not now exist. The course discusses purpose, mission, and duties of the emergency medical technician; leadership;…

  6. W.E.S.T. Pilot Project. Final Report.

    ERIC Educational Resources Information Center

    O'Gorman, Lori A. Stinson

    The Saskatchewan Federation of Labor (SFL) conducted a Workers' Education for Skills Training, or WEST Program, to upgrade its membership's basic literacy skills. The purpose of the WEST Program was to develop, ensure access to, and build support for a workplace literacy program designed to meet the diverse needs of affiliates' members. Six…

  7. Lifelong Learning: Proceedings of a Symposium. 16 May 2002

    ERIC Educational Resources Information Center

    Selby Smith, Chris, Ed.; Ferrier, Fran, Ed.

    2003-01-01

    The Educational Research Centre for the Economics of Education and Training (CEET) conducted a survey focusing on lifelong learning and the world of work, particularly on the need for retraining and upgrading of skills and knowledge. The survey involved five different approaches: surveys of the available quantitative and qualitative material; a…

  8. Energy Conservation in Our Schools--A Practical Approach.

    ERIC Educational Resources Information Center

    Brewin, C. Edwin; Racich, Matthew J.

    A practical approach designed to reduce energy waste by schools is to improve the knowledge and upgrade the skills of school building custodians. This paper discusses an operation and maintenance training program for custodians developed by the Will County (Illinois) educational service region. The major parts of the program consist of skill…

  9. Development of a Competency-Based Curriculum for Upgrading Water Treatment Technicians. Final Report.

    ERIC Educational Resources Information Center

    Ross-Harrington, Melinda

    The major purpose of a project has been to develop an instructional program for training water treatment technicians through the cooperative efforts of industry, the regulatory agency (West Virginia State Department of Health), and vocational education. After the appropriate job competencies were identified, a program was developed combining a…

  10. Effects of ground trainer use on the psychological and physiological states of students in private pilot training.

    DOT National Transportation Integrated Search

    1976-03-01

    Student pilots receiving all instruction in an aircraft and student pilots who received a portion of their flight training in a ground trainer were compared in terms of flying proficiency, psychological (anxiety) states during training, and certain p...

  11. On-Board Training for US Payloads

    NASA Technical Reports Server (NTRS)

    Murphy, Benjamin; Meacham, Steven (Technical Monitor)

    2001-01-01

    The International Space Station (ISS) crew follows a training rotation schedule that puts them in the United States about every three months for a three-month training window. While in the US, the crew receives training on both ISS systems and payloads. Crew time is limited, and system training takes priority over payload training. For most flights, there is sufficient time to train all systems and payloads. As more payloads are flown, training time becomes a more precious resource. Less training time requires payload developers (PDs) to develop alternatives to traditional ground training. To ensure their payloads have sufficient training to achieve their scientific goals, some PDs have developed on-board trainers (OBTs). These OBTs are used to train the crew when no or limited ground time is available. These lessons are also available on-orbit to refresh the crew about their ground training, if it was available. There are many types of OBT media, such as on-board computer based training (OCBT), video/photo lessons, or hardware simulators. The On-Board Training Working Group (OBTWG) and Courseware Development Working Group (CDWG) are responsible for developing the requirements for the different types of media.

  12. 45 CFR 1210.2-1 - Grounds for deselection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ...) Disruptive conduct during training sessions; (b) Conviction of any criminal offense under Federal, State or... § 1210.2-1 Grounds for deselection. ACTION may deselect a Trainee out of a training program for any of the following reasons: (a) Failure to meet training selection standards which includes, but is not...

  13. Instilling Foundation Behaviors of Professional Practice in Undergraduate Athletic Training Students: A Grounded Theory Study

    ERIC Educational Resources Information Center

    O'Brien, Christopher W.

    2011-01-01

    The purpose of this grounded theory study was to investigate the implementation of the "Foundational Behaviors of Professional Practice" in undergraduate athletic training education program curriculums accredited by the Commission on Accreditation of Athletic Training Education [CAATE]. Specifically, this study examined the educational and…

  14. CESR Upgrade: Plans and Recent Performance

    NASA Astrophysics Data System (ADS)

    Rogers, Joseph T.

    1996-05-01

    We are now in the second phase of a program to substantially upgrade the luminosity of the CESR e^+ e^- collider by increasing the number of stored bunches. In the first phase, completed in 1995, we progressed from collisions of beams of 7 bunches to beams of 9 trains of two bunches each, achieving a record luminosity of 3.2 × 10^32 cm-2s-1. To avoid unwanted collisions at each side of the interaction point, we electrostatically separate the beams on antisymmetric orbits, with a ± 2.1 mrad crossing angle at the interaction point. For the second phase we have altered the interaction region quadrupole magnets to increase the physical aperture and to reduce the maximum horizontal β in this region. We plan to store 9 trains of 3 bunches in the second phase, and anticipate a luminosity of 6 × 10^32 cm-2s-1. In the third phase installation, to begin in late 1997, we will replace the interaction region quadrupoles with a combination of a permanent magnet quadrupole and superconducting quadrupole pair on each side of the interaction point, which will further reduce the β functions throughout the interaction region and at the interaction point. To accomodate the higher currents we will replace each of the four 5-cell copper RF cavities with a single-cell superconducting cavity. In this phase we expect to achieve a luminosity in excess of 10^33 cm-2s-1 with 9 trains of 5 bunches. Recent development work includes the successful test of a superconducting RF cavity in CESR, installation of low-impedance electrostatic separators, upgrades to the vacuum system, a fast digital transverse feedback system, and new beam diagnostics. Recent studies have revealed the effects of collision at a crossing angle, the behavior of the long range beam-beam interaction at parasitic crossings, and the relationship of the dominant multibunch instability to photoemission in the beam chamber.

  15. History of the Army Ground Forces. Study Number 11. Training in the Ground Army 1942-1945

    DTIC Science & Technology

    1948-01-01

    beingmodified by the Replace- ment and School Commnd to relax controls and to nake it tactically realistic, -beqam& a prototype for the combat-in-cities exercise...of fillers would nake possible initiation of training soon after activation day), the unit period from 13 to 11 weeks, and the ooabine& period from i...Final Major Revision of the AGF Training Program, 7 June 193 Before 193, an previously noted, Arm Ground Forces had Teen oceeled by the limited use

  16. Ground Training Devices in Job Sample Approach to UPT [Undergraduate Pilot Training] Selection and Screening. Final Report, September 1972-August 1974.

    ERIC Educational Resources Information Center

    LeMaster, W. Dean; Gray, Thomas H.

    The purpose of this study was to develop a screening procedure for undergraduate pilot training (UPT). This procedure was based upon the use of ground-based instrument trainers in which UPT candidates, naive to flying, were evaluated in their performance of job sample tasks; i.e., basic instrument flying. Training and testing sessions were…

  17. Development of a Portable, Ground-based Ozone Lidar Instrument for Tropospheric Ozone Research and Educational Training

    NASA Technical Reports Server (NTRS)

    Chyba, Thomas; Zemker, Thomas; Fishman, Jack (Technical Monitor)

    1999-01-01

    The objective of this research project is to develop a portable, eye-safe, ground-based ozone lidar instrument specialized for ozone differential absorption lidar (DIAL) measurements in the troposphere. This research project directly supports the goal of NASA's Earth Science Enterprise to understand the distribution and budget of tropospheric ozone (objective 1.5 of the Earth Science Strategic Enterprise Plan, 1998-2002). It can participate in ground validation experiments for TES, a tropospheric ozone satellite mission due to be launched in 2002. It can also be utilized for correlative ground measurements in future GTE (Global Tropospheric Experiment) and space-based ozone lidar missions, such as ORACLE. Multiple ground-based ozone lidar systems would improve the data obtained through current ozone-sonde networks. This prototype instrument could to serve as the basic unit for these and other future monitoring projects requiring multi-instrument networks, such as that proposed for the Global Tropospheric Ozone Project (GTOP). GTOP is currently being formulated by a scientific panel of the International Global Atmospheric Chemistry Project to meet its goal to better understand the processes that control the global distribution of tropospheric ozone. In order for the lidar to be widely deployed in networks, it must be fairly easy to use and maintain as well as being cost-competitive with a ground station launching ozonesondes several times a day. A second 2-year grant to continue this effort with students participating in ground tests and system improvements has been awarded by the Office of Equal Employment Opportunities (OEOP). This project also supports existing NASA lidar missions through its development of advanced, compact lidar technology. Innovations in both transmitters and receivers have been made in this project. Finally, this system could be modified in the future to probe more deeply into the stratosphere. This could be accomplished by increasing the emitted energy or optimizing the wavelengths for this purpose. In addition to NASA, this system has applications to the EPA, NOAA, and the DOD. An AFOSR grant has been awarded based on the results of this effort to fund advanced transmitter development at medium (20-40 mJ) energies. A second proposal to the DOD with a letter of support from Air Force Research Laboratory, has been submitted to extend this uv laser technology to 100 mJ levels. Thus, this project has enabled students and faculty at Hampton University to begin to develop research efforts in support of the mission of the DOD. This instrument will be based at Hampton University (HU) to meet our educational goal to train students in lidar technology as well as atmospheric ozone data analysis and interpretation. It will be also available for off-site measurement campaigns and will serve as a test bed for further instrument development. Later development beyond this grant to extend the scientific usefulness of the instrument may include incorporation of an aerosol channel and upgrading the laser to make stratospheric ozone measurements. Seven undergraduates, three graduate students, and one postdoctoral. researcher (formerly an HU student) have been active participants in this research effort.

  18. Numerical Calculation Method for Prediction of Ground-borne Vibration near Subway Tunnel

    NASA Astrophysics Data System (ADS)

    Tsuno, Kiwamu; Furuta, Masaru; Abe, Kazuhisa

    This paper describes the development of prediction method for ground-borne vibration from railway tunnels. Field measurement was carried out both in a subway shield tunnel, in the ground and on the ground surface. The generated vibration in the tunnel was calculated by means of the train/track/tunnel interaction model and was compared with the measurement results. On the other hand, wave propagation in the ground was calculated utilizing the empirical model, which was proposed based on the relationship between frequency and material damping coefficient α in order to predict the attenuation in the ground in consideration of frequency characteristics. Numerical calculation using 2-dimensinal FE analysis was also carried out in this research. The comparison between calculated and measured results shows that the prediction method including the model for train/track/tunnel interaction and that for wave propagation is applicable to the prediction of train-induced vibration propagated from railway tunnel.

  19. Mark 4A project training evaluation

    NASA Technical Reports Server (NTRS)

    Stephenson, S. N.

    1985-01-01

    A participant evaluation of a Deep Space Network (DSN) is described. The Mark IVA project is an implementation to upgrade the tracking and data acquisition systems of the dSN. Approximately six hundred DSN operations and engineering maintenance personnel were surveyed. The survey obtained a convenience sample including trained people within the population in order to learn what training had taken place and to what effect. The survey questionnaire used modifications of standard rating scales to evaluate over one hundred items in four training dimensions. The scope of the evaluation included Mark IVA vendor training, a systems familiarization training seminar, engineering training classes, a on-the-job training. Measures of central tendency were made from participant rating responses. Chi square tests of statistical significance were performed on the data. The evaluation results indicated that the effects of different Mark INA training methods could be measured according to certain ratings of technical training effectiveness, and that the Mark IVA technical training has exhibited positive effects on the abilities of DSN personnel to operate and maintain new Mark IVA equipment systems.

  20. KSC-2014-2017

    NASA Image and Video Library

    2014-04-04

    CAPE CANAVERAL, Fla. – Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. A large crane is situated next to the ML for lifting of heavy metal beams and other construction materials. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program office at Kennedy. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first mission, Exploration Mission 1, in 2017. Photo credit: NASA/Cory Huston

  1. KSC-2014-2273

    NASA Image and Video Library

    2014-04-22

    CAPE CANAVERAL, Fla. -- Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. Two large cranes are situated next to the ML for lifting of heavy metal beams and other construction materials. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program office at Kennedy. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first mission, Exploration Mission 1, in 2017. Photo credit: NASA/Daniel Casper

  2. Man in the North Technical Paper. Education in the Canadian North, Report Two: Apprentice Teachers.

    ERIC Educational Resources Information Center

    Brown, Doug; And Others

    The objective of this applied research project was to evaluate a formula by which young native Canadians would become teachers through in-service training coupled with academic upgrading. The experiment design paired apprentice and cooperating teachers, provided technical help, planned a schedule of activities for the apprentice, and assessed the…

  3. A Critical Analysis of a New Model for Occupational Therapy Education: Its Applicability for Other Occupations and Systems.

    ERIC Educational Resources Information Center

    National Committee on Employment of Youth, New York, NY.

    The symposium report focuses on an upgrading program (designed by the Consortium for Occupational Therapy Education) to develop alternate routes to credentialled education and training, resulting in opening up occupational therapy career opportunities to young people. The consortium was composed of four New York State hospitals, two academic…

  4. The Alaska experience

    NASA Technical Reports Server (NTRS)

    Mutter, D. L.

    1981-01-01

    The management responsibilities of the Alaska Department of Natural Resources are summarized and the establishment of a geoprocessor system is described. Specific capabilities were defined based on surveys of potential users and pre-existing systems. The procurement process, the initially purchased equipment, and system upgrading are described. Cost, installation and maintenance, site location, training, and staffing of the system are examined.

  5. Education and the New Economy: Views from a Policy Planning Exercise. Rand Issue Paper.

    ERIC Educational Resources Information Center

    Stasz, Cathleen; Chiesa, James

    During the 1990s, policymakers have become increasingly attentive to the relationship between education and national economic health and society's need to upgrade and equalize workforce skills, talent, and wages. The U.S. education and training system is fragmented, decentralized, and in flux, as more responsibility moves from federal to state…

  6. Game-Based Experiential Learning in Online Management Information Systems Classes Using Intel's IT Manager 3

    ERIC Educational Resources Information Center

    Bliemel, Michael; Ali-Hassan, Hossam

    2014-01-01

    For several years, we used Intel's flash-based game "IT Manager 3: Unseen Forces" as an experiential learning tool, where students had to act as a manager making real-time prioritization decisions about repairing computer problems, training and upgrading systems with better technologies as well as managing increasing numbers of technical…

  7. Building a Digital Workforce. Part 2: Reaching Out to Underserved Communities. NPA Report.

    ERIC Educational Resources Information Center

    2002

    The Digital Economic Opportunity Committee (DEOC) was established to examine the information technology (IT) skills gap and make recommendations to eliminate this gap. DEOC believed the appropriate response to this skills gap is two-fold. The first was upgrading existing workers skills through training. The second was expanding the number of…

  8. OEO Programs for Migrant and Seasonal Farm Workers. Title IIIB EOA Projects.

    ERIC Educational Resources Information Center

    Office of Economic Opportunity, Washington, DC.

    The major thrust of Title III-B (Economic Opportunity Act) programs is to prepare migrant and seasonal farm workers for upgraded jobs and to prepare entire farm worker families for alternatives to farm work if they so desire. These alternatives, supported through projects for adult heads of households, emphasize skill training in preparation for…

  9. The Alaska experience

    NASA Astrophysics Data System (ADS)

    Mutter, D. L.

    1981-09-01

    The management responsibilities of the Alaska Department of Natural Resources are summarized and the establishment of a geoprocessor system is described. Specific capabilities were defined based on surveys of potential users and pre-existing systems. The procurement process, the initially purchased equipment, and system upgrading are described. Cost, installation and maintenance, site location, training, and staffing of the system are examined.

  10. TIPP. Training Incentive Payments Program. Five Year's Operations. Final Report.

    ERIC Educational Resources Information Center

    Institute of Public Administration, New York, NY.

    A report is made of the first operating phase from March 1970 through May 1971 of a test of the feasibility of using financial incentives to stimulate more effective upgrading of the skills and earnings of low income workers in the private sector. TIPP provides incentive payments to employers based on results achieved. Program administration…

  11. Gender Policies Meet VET Practices--The Case of Health and Social Care in Norway

    ERIC Educational Resources Information Center

    Høst, Håkon; Seland, Idunn; Skålholt, Asgeir

    2015-01-01

    Could the labour market gender balance be improved by introducing new types of apprenticeship-trained workers? This article investigates what happened in the wake of the Norwegian VET programme for health and social care, a new approach introduced via the 1994 educational reform. By upgrading this traditionally female-dominated area of education,…

  12. Educating Educators in a Volatile Climate--The Challenge of Modernising Higher Business Schools in Serbia and Montenegro

    ERIC Educational Resources Information Center

    Hollinshead, Graham

    2006-01-01

    This study is set in the rapidly changing higher educational environment that has ensued in Serbia and Montenegro in the post Milosevic era. Its primary focus is a "Training Trainers" initiative, mounted by the GTZ (Deutsche Gesellschaft fur Technische Zusammenarbeit/Society for Technical Co-operation), designed to upgrade the teaching…

  13. 77 FR 64374 - Notification of Petition for Approval; Port Authority Trans-Hudson Product Safety Plan

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-19

    ... assigned the petition Docket Number FRA-2012-0075. PATH is upgrading some of its track circuits with Digicode microprocessor-based track circuits. The Digicode track circuit is part of Alstom's Smartway Digital Track Circuit product line and will be used by PATH for train detection and broken rail detection...

  14. NPOESS C3S Expandability: SafetyNet(TM) and McMurdo Improvements

    NASA Astrophysics Data System (ADS)

    Paciaroni, J.; Jamilkowski, M. L.

    2009-12-01

    The National Oceanic & Atmospheric Administration (NOAA), Department of Defense (DoD), and National Aeronautics and Space Administration (NASA) are jointly acquiring the next-generation weather and environmental satellite system; the National Polar-orbiting Operational Environmental Satellite System (NPOESS). NPOESS replaces the current Polar-orbiting Operational Environmental Satellites (POES) managed by NOAA and the Defense Meteorological Satellite Program (DMSP) managed by the DoD. The NPOESS satellites carry a suite of sensors that collect meteorological, oceanographic, climatological, and solar-geophysical observations of the earth, atmosphere, and space. The command and telemetry portion of NPOESS is the Command, Control and Communications Segment (C3S), developed by Raytheon Intelligence & Information Systems. C3S is responsible for managing the overall NPOESS mission from control and status of the space and ground assets to ensuring delivery of timely, high quality data from the Space Segment (SS) to the Interface Data Processing Segment (IDPS) for processing. In addition, the C3S provides the globally distributed ground assets necessary to collect and transport mission, telemetry, and command data between the satellites and the processing locations. The C3S provides all functions required for day-to-day commanding and state-of-health monitoring of the NPP and NPOESS satellites, and delivery of Stored Mission Data (SMD) to each U.S. Weather Central Interface Data Processor (IDP) for data products development and transfer to System subscribers. The C3S also monitors and reports system-wide health and status and data communications with external systems and between the NPOESS segments. Two crucial elements of NPOESS C3S expandability are SafetyNet(TM) and communications improvements to McMurdo Station, Antarctica. ‘SafetyNet(TM)’ is a key feature of the National Polar-orbiting Operational Environmental Satellite System (NPOESS), vital element of the C3S and Northrop Grumman Space Technology patented data collection architecture. The centerpiece of SafetyNet(TM) is the system of fifteen globally-distributed ground receptors developed by Raytheon Company. These receptors or antennae will collect up to five times as much environmental data approximately four times faster than current polar-orbiting weather satellites. Once collected, these data will be forwarded near-instantaneously to U.S. weather centrals via global fiber optic network for processing and production of data records for use in environmental prediction models. In January 2008, Raytheon Company achieved a significant milestone for the NPOESS program by successfully completing the first phase of a major communications upgrade for Antarctica. The upgrade of the off-continent satellite communications link at McMurdo Station more than tripled the bandwidth available for scientific research, weather prediction, and health and safety of those stationed at McMurdo. The project is part of the company’s C3S under development for NPOESS. This upgrade paves the way for a second major communications upgrade planned for 2012 in preparation for the use of McMurdo Station as one of the 15 NPOESS ground stations worldwide that will be receiving environmental data collected by the NPOESS satellites.

  15. Laboratory instrumentation modernization at the WPI Nuclear Reactor Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1995-01-01

    With partial funding from the Department of Energy (DOE) University Reactor Instrumentation Program several laboratory instruments utilized by students and researchers at the WPI Nuclear Reactor Facility have been upgraded or replaced. Designed and built by General Electric in 1959, the open pool nuclear training reactor at WPI was one of the first such facilities in the nation located on a university campus. Devoted to undergraduate use, the reactor and its related facilities have been since used to train two generations of nuclear engineers and scientists for the nuclear industry. The low power output of the reactor and an ergonomicmore » facility design make it an ideal tool for undergraduate nuclear engineering education and other training. The reactor, its control system, and the associate laboratory equipment are all located in the same room. Over the years, several important milestones have taken place at the WPI reactor. In 1969, the reactor power level was upgraded from 1 kW to 10 kW. The reactor`s Nuclear Regulatory Commission operating license was renewed for 20 years in 1983. In 1988, under DOE Grant No. DE-FG07-86ER75271, the reactor was converted to low-enriched uranium fuel. In 1992, again with partial funding from DOE (Grant No. DE-FG02-90ER12982), the original control console was replaced.« less

  16. Challenges to laboratory hematology practice: Egypt perspective.

    PubMed

    Rizk, S H

    2018-05-01

    Laboratory hematology is an integral part of all clinical laboratories along the extensive healthcare facilities in Egypt. The aim of this review is to portrait the laboratory hematology practice in Egypt including its unique socioeconomic background, blood disease pattern, education and training, regulatory oversight, and the related challenges. Current practice varies widely between different parts of the healthcare system in terms of the range of tests, applied techniques, workforce experience, and quality of service. The national transfusion service (NBTS) in Egypt has been recently upgraded and standardized according to the World Health Organization (WHO) guidelines. Formal postgraduate education roughly follows the British system. Laboratory hematology specialization is achieved through 2-3 years masters' degree followed by 2-4 years doctorate degree in clinical pathology with training and research in hematology. Improvement of laboratory hematology education is recently undergoing a reform as a part of the modernization of higher education policy and following the standards developed by the National Quality Assurance and Accreditation Agency (NQAAA). Accreditation of medical laboratories is recently progressing with the development of the "Egyptian Accreditation Council" (EGAC) as the sole accreditation body system and training of assessors. Current laboratory system has many challenges, some are related to the inadequate system performance, and others are unique to laboratory hematology issues. The rapid technological advances and therapeutic innovations in hematology practice call for an adapting laboratory system with continuous upgrading. © 2018 John Wiley & Sons Ltd.

  17. Simulation of the thermal performance of a hybrid solar-assisted ground-source heat pump system in a school building

    NASA Astrophysics Data System (ADS)

    Androulakis, N. D.; Armen, K. G.; Bozis, D. A.; Papakostas, K. T.

    2018-04-01

    A hybrid solar-assisted ground-source heat pump (SAGSHP) system was designed, in the frame of an energy upgrade study, to serve as a heating system in a school building in Greece. The main scope of this study was to examine techniques to reduce the capacity of the heating equipment and to keep the primary energy consumption low. Simulations of the thermal performance of both the building and of five different heating system configurations were performed by using the TRNSYS software. The results are presented in this work and show that the hybrid SAGSHP system displays the lower primary energy consumption among the systems examined. A conventional ground-source heat pump system has the same primary energy consumption, while the heat pump's capacity is double and the ground heat exchanger 2.5 times longer. This work also highlights the contribution of simulation tools to the design of complex heating systems with renewable energy sources.

  18. [Development of fixed-base full task space flight training simulator].

    PubMed

    Xue, Liang; Chen, Shan-quang; Chang, Tian-chun; Yang, Hong; Chao, Jian-gang; Li, Zhi-peng

    2003-01-01

    Fixed-base full task flight training simulator is a very critical and important integrated training facility. It is mostly used in training of integrated skills and tasks, such as running the flight program of manned space flight, dealing with faults, operating and controlling spacecraft flight, communicating information between spacecraft and ground. This simulator was made up of several subentries including spacecraft simulation, simulating cabin, sight image, acoustics, main controlling computer, instructor and assistant support. It has implemented many simulation functions, such as spacecraft environment, spacecraft movement, communicating information between spacecraft and ground, typical faults, manual control and operating training, training control, training monitor, training database management, training data recording, system detecting and so on.

  19. Effects of the addition of functional electrical stimulation to ground level gait training with body weight support after chronic stroke.

    PubMed

    Prado-Medeiros, Christiane L; Sousa, Catarina O; Souza, Andréa S; Soares, Márcio R; Barela, Ana M F; Salvini, Tania F

    2011-01-01

    The addition of functional electrical stimulation (FES) to treadmill gait training with partial body weight support (BWS) has been proposed as a strategy to facilitate gait training in people with hemiparesis. However, there is a lack of studies that evaluate the effectiveness of FES addition on ground level gait training with BWS, which is the most common locomotion surface. To investigate the additional effects of commum peroneal nerve FES combined with gait training and BWS on ground level, on spatial-temporal gait parameters, segmental angles, and motor function. Twelve people with chronic hemiparesis participated in the study. An A1-B-A2 design was applied. A1 and A2 corresponded to ground level gait training using BWS, and B corresponded to the same training with the addition of FES. The assessments were performed using the Modified Ashworth Scale (MAS), Functional Ambulation Category (FAC), Rivermead Motor Assessment (RMA), and filming. The kinematics analyzed variables were mean walking speed of locomotion; step length; stride length, speed and duration; initial and final double support duration; single-limb support duration; swing period; range of motion (ROM), maximum and minimum angles of foot, leg, thigh, and trunk segments. There were not changes between phases for the functional assessment of RMA, for the spatial-temporal gait variables and segmental angles, no changes were observed after the addition of FES. The use of FES on ground level gait training with BWS did not provide additional benefits for all assessed parameters.

  20. Differences in Train-induced Vibration between Hard Soil and Soft Soil

    NASA Astrophysics Data System (ADS)

    Noyori, M.; Yokoyama, H.

    2017-12-01

    Vibration and noise caused by running trains sometimes raises environmental issues. Train-induced vibration is caused by moving static and dynamic axle loads. To reduce the vibration, it is important to clarify the conditions under which the train-induced vibration increases. In this study, we clarified the differences in train-induced vibration between on hard soil and on soft soil using a numerical simulation method. The numerical simulation method we used is a combination of two analysis. The one is a coupled vibration analysis model of a running train, a track and a supporting structure. In the analysis, the excitation force of the viaduct slabs generated by a running train is computed. The other analysis is a three-dimensional vibration analysis model of a supporting structure and the ground into which the excitation force computed by the former analysis is input. As a result of the numerical simulation, the ground vibration in the area not more than 25m from the center of the viaduct is larger under the soft soil condition than that under the hard soil condition in almost all frequency ranges. On the other hand, the ground vibration of 40 and 50Hz at a point 50m from the center of the viaduct under the hard soil condition is larger than that under the soft soil condition. These are consistent with the result of the two-dimensional FEM based on a ground model alone. Thus, we concluded that these results are obtained from not the effects of the running train but the vibration characteristics of the ground.

  1. Environmental Assessment for Operations, Upgrades, and Consolidation at the Western Command Site, New Mexico

    DTIC Science & Technology

    2014-09-01

    to house the newly formed 498th Nuclear Systems Wing. This facility will be a two-story, steel-framed structure with reinforced concrete foundation ...occurs at depths of 200 to 400 feet below ground surface . The perched aquifer is a result of infiltration of water from both man-made and natural origins...as a Sensitive Compartmented Information Facility with reinforced concrete foundation , floors, and reinforced masonry walls. The construction

  2. Current instrument status of the Airborne Visible/Infrared Imaging Spectrometer (AVIRIS)

    NASA Technical Reports Server (NTRS)

    Eastwood, Michael L.; Sarture, Charles M.; Chrien, Thomas G.; Green, Robert O.; Porter, Wallace M.

    1991-01-01

    An upgraded version of AVIRIS, an airborne imaging spectrometer based on a whiskbroom-type scanner coupled via optical fibers to four dispersive spectrometers, that has been in operation since 1987 is described. Emphasis is placed on specific AVIRIS subsystems including foreoptics, fiber optics, and an in-flight reference source; spectrometers and detector dewars; a scan drive mechanism; a signal chain; digital electronics; a tape recorder; calibration systems; and ground support requirements.

  3. The effect of ground borne vibrations from high speed train on overhead line equipment (OHLE) structure considering soil-structure interaction.

    PubMed

    Ngamkhanong, Chayut; Kaewunruen, Sakdirat

    2018-06-15

    At present, railway infrastructure experiences harsh environments and aggressive loading conditions from increased traffic and load demands. Ground borne vibration has become one of these environmental challenges. Overhead line equipment (OHLE) provides electric power to the train and is, for one or two tracks, normally supported by cantilever masts. A cantilever mast, which is made of H-section steel, is slender and has a poor dynamic behaviour by nature. It can be seen from the literature that ground borne vibrations cause annoyance to people in surrounding areas especially in buildings. Nonetheless, mast structures, which are located nearest and alongside the railway track, have not been fully studied in terms of their dynamic behaviour. This paper presents the effects of ground borne vibrations generated by high speed trains on cantilever masts and contact wire located alongside railway tracks. Ground borne vibration velocities at various train speeds, from 100 km/h to 300 km/h, are considered based on the consideration of semi-empirical models for predicting low frequency vibration on ground. A three-dimensional mast structure with varying soil stiffness is made using a finite element model. The displacement measured is located at the end of cantilever mast which is the position of contact wire. The construction tolerance of contact stagger is used as an allowable movement of contact wire in transverse direction. The results show that the effect of vibration velocity from train on the transverse direction of mast structure is greater than that on the longitudinal direction. Moreover, the results obtained indicate that the ground bourn vibrations caused by high speed train are not strong enough to cause damage to the contact wire. The outcome of this study will help engineers improve the design standard of cantilever mast considering the effect of ground borne vibration as preliminary parameter for construction tolerances. Copyright © 2018 Elsevier B.V. All rights reserved.

  4. Recent Upgrades to NASA SPoRT Initialization Datasets for the Environmental Modeling System

    NASA Technical Reports Server (NTRS)

    Case, Jonathan L.; Lafontaine, Frank J.; Molthan, Andrew L.; Zavodsky, Bradley T.; Rozumalski, Robert A.

    2012-01-01

    The NASA Short-term Prediction Research and Transition (SPoRT) Center has developed several products for its NOAA/National Weather Service (NWS) partners that can initialize specific fields for local model runs within the NOAA/NWS Science and Training Resource Center Environmental Modeling System (EMS). The suite of SPoRT products for use in the EMS consists of a Sea Surface Temperature (SST) composite that includes a Lake Surface Temperature (LST) analysis over the Great Lakes, a Great Lakes sea-ice extent within the SST composite, a real-time Green Vegetation Fraction (GVF) composite, and NASA Land Information System (LIS) gridded output. This paper and companion poster describe each dataset and provide recent upgrades made to the SST, Great Lakes LST, GVF composites, and the real-time LIS runs.

  5. VLT FORS2 COMPARATIVE TRANSMISSION SPECTROSCOPY: DETECTION OF Na IN THE ATMOSPHERE OF WASP-39b FROM THE GROUND

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nikolov, Nikolay; Sing, David K.; Evans, Thomas M.

    2016-12-01

    We present transmission spectroscopy of the warm Saturn-mass exoplanet WASP-39b made with the Very Large Telescope FOcal Reducer and Spectrograph (FORS2) across the wavelength range 411–810 nm. The transit depth is measured with a typical precision of 240 parts per million (ppm) in wavelength bins of 10 nm on a V  = 12.1 mag star. We detect the sodium absorption feature (3.2 σ ) and find evidence of potassium. The ground-based transmission spectrum is consistent with Hubble Space Telescope ( HST ) optical spectroscopy, supporting the interpretation that WASP-39b has a largely clear atmosphere. Our results demonstrate the great potential of the recently upgraded FORS2 spectrograph formore » optical transmission spectroscopy, with which we obtained HST -quality light curves from the ground.« less

  6. KSC-2014-2887

    NASA Image and Video Library

    2014-06-11

    CAPE CANAVERAL, Fla. – Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. A section of the metal structure is lowered by crane to the ground near the ML. The ML is being modified and strengthened to accommodate the weight, size and thrust at launch of NASA's Space Launch System, or SLS, and Orion spacecraft. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program office at Kennedy. The existing 24-foot exhaust hole is being enlarged and strengthened for the larger, heavier SLS rocket. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first mission, Exploration Mission-1, in 2017. Photo credit: NASA/Daniel Casper

  7. KSC-2014-2886

    NASA Image and Video Library

    2014-06-11

    CAPE CANAVERAL, Fla. – Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. A section of the metal structure is lowered by crane to the ground near the ML. The ML is being modified and strengthened to accommodate the weight, size and thrust at launch of NASA's Space Launch System, or SLS, and Orion spacecraft. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program office at Kennedy. The existing 24-foot exhaust hole is being enlarged and strengthened for the larger, heavier SLS rocket. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first mission, Exploration Mission-1, in 2017. Photo credit: NASA/Daniel Casper

  8. KSC-2014-2888

    NASA Image and Video Library

    2014-06-11

    CAPE CANAVERAL, Fla. – Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. A section of the metal structure is lowered by crane to the ground near the ML. The ML is being modified and strengthened to accommodate the weight, size and thrust at launch of NASA's Space Launch System, or SLS, and Orion spacecraft. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program office at Kennedy. The existing 24-foot exhaust hole is being enlarged and strengthened for the larger, heavier SLS rocket. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first mission, Exploration Mission-1, in 2017. Photo credit: NASA/Daniel Casper

  9. Shape-specific perceptual learning in a figure-ground segregation task.

    PubMed

    Yi, Do-Joon; Olson, Ingrid R; Chun, Marvin M

    2006-03-01

    What does perceptual experience contribute to figure-ground segregation? To study this question, we trained observers to search for symmetric dot patterns embedded in random dot backgrounds. Training improved shape segmentation, but learning did not completely transfer either to untrained locations or to untrained shapes. Such partial specificity persisted for a month after training. Interestingly, training on shapes in empty backgrounds did not help segmentation of the trained shapes in noisy backgrounds. Our results suggest that perceptual training increases the involvement of early sensory neurons in the segmentation of trained shapes, and that successful segmentation requires perceptual skills beyond shape recognition alone.

  10. The Plate Boundary Observatory Cascadia Network: Development and Installation of a Large Scale Real-time GPS Network

    NASA Astrophysics Data System (ADS)

    Austin, K. E.; Blume, F.; Berglund, H. T.; Feaux, K.; Gallaher, W. W.; Hodgkinson, K. M.; Mattioli, G. S.; Mencin, D.

    2014-12-01

    The EarthScope Plate Boundary Observatory (PBO), through a NSF-ARRA supplement, has enhanced the geophysical infrastructure in in the Pacific Northwest by upgrading a total of 282 Plate Boundary Observatory GPS stations to allow the collection and distribution of high-rate (1 Hz), low-latency (<1 s) data streams (RT-GPS). These upgraded stations supplemented the original 100 RT-GPS stations in the PBO GPS network. The addition of the new RT-GPS sites in Cascadia should spur new volcano and earthquake research opportunities in an area of great scientific interest and high geophysical hazard. Streaming RT-GPS data will enable researchers to detect and investigate strong ground motion during large geophysical events, including a possible plate-interface earthquake, which has implications for earthquake hazard mitigation. A Mw 6.9 earthquake occurred on March 10, 2014, off the coast of northern California. As a response, UNAVCO downloaded high-rate GPS data from Plate Boundary Observatory stations within 500 km of the epicenter of the event, providing a good test of network performance.In addition to the 282 stations upgraded to real-time, 22 new meteorological instruments were added to existing PBO stations. Extensive testing of BGAN satellite communications systems has been conducted to support the Cascadia RT-GPS upgrades and the installation of three BGAN satellite fail over systems along the Cascadia margin will allow for the continuation of data flow in the event of a loss of primary communications during in a large geophysical event or other interruptions in commercial cellular networks. In summary, with these additional upgrades in the Cascadia region, the PBO RT-GPS network will increase to 420 stations. Upgrades to the UNAVCO data infrastructure included evaluation and purchase of the Trimble Pivot Platform, servers, and additional hardware for archiving the high rate data, as well as testing and implementation of GLONASS and Trimble RTX positioning on the receivers. UNAVCO staff is working closely with the UNAVCO community to develop data standards, protocols, and a science plan for the use of RT-GPS data.

  11. Effect of train vibration on settlement of soil: A numerical analysis

    NASA Astrophysics Data System (ADS)

    Tiong, Kah-Yong; Ling, Felix Ngee-Leh; Talib, Zaihasra Abu

    2017-10-01

    The drastic development of transit system caused the influence of ground-borne vibrations induced by train on ground settlement became concern problem nowadays. The purpose of this study is to investigate soil settlement caused by train vibration. To facilitate this study, computer simulation of soil dynamic response using commercial finite element package - PLAXIS 2D was performed to simulate track-subgrade system together with dynamic train load under three different conditions. The results of simulation analysis established the facts that the soil deformation increased with raising in water level. This phenomenon happens because the increasing water level not only induced greater excess pore water pressure but also reduced stiffness of soil. Furthermore, the simulation analysis also deduced that the soil settlement was reduced by placing material with high stiffness between the subgrade and the ballast layer since material with high stiffness was able to dissipate energy efficiently due to its high bearing capacity, thus protecting the subgrade from deteriorating. The simulation analysis result also showed that the soil dynamic response increased with the increase in the speed of train and a noticeable amplification in soil deformation occurred as the train speed approaches the Rayleigh wave velocity of the track subgrade system. This is due to the fact that dynamic train load depend on both the self-weight of the train and the dynamic component due to inertial effects associated with the train speed. Thus, controlling the train speeds under critical velocity of track-subgrade system is able to ensure the safety of train operation as it prevents track-ground resonance and dramatic ground.

  12. Underground and ground-level particulate matter concentrations in an Italian metro system

    NASA Astrophysics Data System (ADS)

    Cartenì, Armando; Cascetta, Furio; Campana, Stefano

    2015-01-01

    All around the world, many studies and experimental results have assessed elevated concentrations of Particulate Matter (PM) in underground metro systems, with non-negligible implications for human health due to protracted exposure to fine particles. Starting from this consideration, an intensive particulate sampling campaign was carried out in January 2014 measuring the PM concentrations in the Naples (Italy) Metro Line 1, both at station platforms and inside trains. Naples Metro Line 1 is about 18 km long, with 17 stations (3 ground-level and 14 below-ground ones). Experimental results show that the average PM10 concentrations measured in the underground station platforms range between 172 and 262 μg/m3 whilst the average PM2.5 concentrations range between 45 and 60 μg/m3. By contrast, in ground-level stations no significant difference between stations platforms and urban environment measurements was observed. Furthermore, a direct correlation between trains passage and PM concentrations was observed, with an increase up to 42% above the average value. This correlation is possibly caused by the re-suspension of the particles due to the turbulence induced by trains. The main original finding was the real-time estimations of PM levels inside the trains travelling both in ground-level and underground sections of Line 1. The results show that high concentrations of both PM10 (average values between 58 μg/m3 and 138 μg/m3) and PM2.5 (average values between 18 μg/m3 and 36 μg/m3) were also measured inside trains. Furthermore, measurements show that windows left open on trains caused the increase in PM concentrations inside trains in the underground section, while in the ground-level section the clean air entering the trains produced an environmental "washing effect". Finally, it was estimated that every passenger spends on average about 70 min per day exposed to high levels of PM.

  13. Green's function of multi-layered poroelastic half-space for models of ground vibration due to railway traffic

    NASA Astrophysics Data System (ADS)

    Wang, Futong; Tao, Xiaxin; Xie, Lili; Raj, Siddharthan

    2017-04-01

    This study proposes a Green's function, an essential representation of water-saturated ground under moving excitation, to simulate ground borne vibration from trains. First, general solutions to the governing equations of poroelastic medium are derived by means of integral transform. Secondly, the transmission and reflection matrix approach is used to formulate the relationship between displacement and stress of the stratified ground, which results in the matrix of the Green's function. Then the Green's function is combined into a train-track-ground model, and is verified by typical examples and a field test. Additional simulations show that the computed ground vibration attenuates faster in the immediate vicinity of the track than in the surrounding area. The wavelength of wheel-rail unevenness has a notable effect on computed displacement and pore pressure. The variation of vibration intensity with the depth of ground is significantly influenced by the layering of the strata soil. When the train speed is equal to the velocity of the Rayleigh wave, the Mach cone appears in the simulated wave field. The proposed Green's function is an appropriate representation for a layered ground with shallow ground water table, and will be helpful to understand the dynamic responses of the ground to complicated moving excitation.

  14. Hazardous materials on golf courses: Experience and knowledge of golf course superintendents and grounds maintenance workers from seven states

    PubMed Central

    Arcury-Quandt, Alice E.; Gentry, Amanda L.; Marín, Antonio J.

    2011-01-01

    Background The golf course industry has a growing Latino work force. Little occupational health research has addressed this work force. This paper examines golf course superintendents’ and Latino grounds maintenance workers’ pesticide knowledge, beliefs, and safety training. In particular, it focuses on knowledge of and adherence to OSHA Right-to-Know regulations. Methods In person, in-depth interviews were conducted with ten golf course superintendents in five states and with sixteen Latino grounds maintenance workers in four states. Results Few superintendents were in compliance with Right-to-Know regulations or did pesticide safety training with all of their workers. Few workers had any pesticide safety knowledge. Most safety training on golf courses was rudimentary and focused on machine safety, and was usually conducted in the off-season or on rainy days, not before workers were assigned tasks. Conclusions More Right-to-Know training is necessary for superintendents and grounds maintenance workers. Culturally and linguistically appropriate Spanish language materials need to be developed or made more widely available to train workers. Better enforcement of safety and training regulations is necessary. PMID:21360723

  15. The Role of Community Colleges in Career Transitions for Older Workers

    ERIC Educational Resources Information Center

    Cummins, Phyllis A.

    2015-01-01

    Despite the desire of many older adults to remain in the workforce, those without jobs face unprecedented durations of unemployment. Many of the unemployed lack current skills for jobs in demand and need to either upgrade their skills or be trained for a new occupation to become reemployed. An aging workforce, combined with the negative effects of…

  16. Upgrading of the Information and Communication Competence of Instructors in the Environment of an Internet Conference

    ERIC Educational Resources Information Center

    Laletin, V. A.; Stolbova, I. D.; Stolbov, O. V.

    2012-01-01

    Research on the competence of Russian college and university instructors in the use of information and communication technologies shows that it can be improved through the use of online conferences if training is provided in advance. Russian education needs to devote more resources to developing this use of technology. (Contains 5 figures and 1…

  17. What Do Secondary Trainee Teachers Say about Teaching as a Profession of Their "Choice" in Malawi?

    ERIC Educational Resources Information Center

    Mtika, Peter; Gates, Peter

    2011-01-01

    This interview-based qualitative study is concerned with the recruitment of secondary teachers in Malawi. This study shows a range of perspectives for pursuing a teacher training course: failure to follow a desired career, springboard to other careers, to upgrade, and teaching out of vocation. It shows that trainee teachers held a range of images…

  18. The Utilization of Psychologists for Staff Development in a Large Public School System: A Staff Development Director's Perspective.

    ERIC Educational Resources Information Center

    Stone, James L., Jr.

    This model proposes the TAP Team approach as an on-site delivery system for local school staff development in large, urban school systems. TAP emphasizes in-service training for both upgrading skills of staff and for helping staff acquire new skills in the areas of coping strategies, classroom management, communication skills, instructional…

  19. GSFC Technology Development Center Report

    NASA Technical Reports Server (NTRS)

    Himwich, Ed; Gipson, John

    2013-01-01

    This report summarizes the activities of the GSFC Technology Development Center (TDC) for 2012 and forecasts planned activities for 2013. The GSFC TDC develops station software including the Field System (FS), scheduling software (SKED), hardware including tools for station timing and meteorology, scheduling algorithms, and operational procedures. It provides a pool of individuals to assist with station implementation, check-out, upgrades, and training.

  20. Improvement of Methodology of Teaching Natural Science for Students with Intellectual Disabilities by Means of 3D-Graphics

    ERIC Educational Resources Information Center

    Fatikhova, Lidiya F.; Sayfutdiyarova, Elena F.

    2017-01-01

    At the present stage of the development of education of persons with disabilities ways of enhancing the effectiveness of training students with intellectual disabilities undergo active research. One means of improving the efficiency and further upgrading of teaching methods is information technology. The article gives an example of improvement of…

  1. Toward a Career Ladder in Nursing: Upgrading Nurse's Aides to LPNs Through a Work-Study Program. Final Progress Report.

    ERIC Educational Resources Information Center

    Medical and Health Research Association of New York City, Inc., NY.

    To arrange a program that would enable nurse's aides to undertake licensed practical nurse (LPN) training without financial sacrifice, a 3-year experimental and demonstration project, funded by the Manpower Administration, was conducted in New York City between October 1967 and September 1969. Through a work-study arrangement, 422 nurse's aides in…

  2. Integrating machine learning and physician knowledge to improve the accuracy of breast biopsy.

    PubMed

    Dutra, I; Nassif, H; Page, D; Shavlik, J; Strigel, R M; Wu, Y; Elezaby, M E; Burnside, E

    2011-01-01

    In this work we show that combining physician rules and machine learned rules may improve the performance of a classifier that predicts whether a breast cancer is missed on percutaneous, image-guided breast core needle biopsy (subsequently referred to as "breast core biopsy"). Specifically, we show how advice in the form of logical rules, derived by a sub-specialty, i.e. fellowship trained breast radiologists (subsequently referred to as "our physicians") can guide the search in an inductive logic programming system, and improve the performance of a learned classifier. Our dataset of 890 consecutive benign breast core biopsy results along with corresponding mammographic findings contains 94 cases that were deemed non-definitive by a multidisciplinary panel of physicians, from which 15 were upgraded to malignant disease at surgery. Our goal is to predict upgrade prospectively and avoid surgery in women who do not have breast cancer. Our results, some of which trended toward significance, show evidence that inductive logic programming may produce better results for this task than traditional propositional algorithms with default parameters. Moreover, we show that adding knowledge from our physicians into the learning process may improve the performance of the learned classifier trained only on data.

  3. Advanced training systems

    NASA Technical Reports Server (NTRS)

    Savely, Robert T.; Loftin, R. Bowen

    1990-01-01

    Training is a major endeavor in all modern societies. Common training methods include training manuals, formal classes, procedural computer programs, simulations, and on-the-job training. NASA's training approach has focussed primarily on on-the-job training in a simulation environment for both crew and ground based personnel. NASA must explore new approaches to training for the 1990's and beyond. Specific autonomous training systems are described which are based on artificial intelligence technology for use by NASA astronauts, flight controllers, and ground based support personnel that show an alternative to current training systems. In addition to these specific systems, the evolution of a general architecture for autonomous intelligent training systems that integrates many of the features of traditional training programs with artificial intelligence techniques is presented. These Intelligent Computer Aided Training (ICAT) systems would provide much of the same experience that could be gained from the best on-the-job training.

  4. Upgrade of the BATMAN test facility for H- source development

    NASA Astrophysics Data System (ADS)

    Heinemann, B.; Fröschle, M.; Falter, H.-D.; Fantz, U.; Franzen, P.; Kraus, W.; Nocentini, R.; Riedl, R.; Ruf, B.

    2015-04-01

    The development of a radio frequency (RF) driven source for negative hydrogen ions for the neutral beam heating devices of fusion experiments has been successfully carried out at IPP since 1996 on the test facility BATMAN. The required ITER parameters have been achieved with the prototype source consisting of a cylindrical driver on the back side of a racetrack like expansion chamber. The extraction system, called "Large Area Grid" (LAG) was derived from a positive ion accelerator from ASDEX Upgrade (AUG) using its aperture size (ø 8 mm) and pattern but replacing the first two electrodes and masking down the extraction area to 70 cm2. BATMAN is a well diagnosed and highly flexible test facility which will be kept operational in parallel to the half size ITER source test facility ELISE for further developments to improve the RF efficiency and the beam properties. It is therefore planned to upgrade BATMAN with a new ITER-like grid system (ILG) representing almost one ITER beamlet group, namely 5 × 14 apertures (ø 14 mm). Additionally to the standard three grid extraction system a repeller electrode upstream of the grounded grid can optionally be installed which is positively charged against it by 2 kV. This is designated to affect the onset of the space charge compensation downstream of the grounded grid and to reduce the backstreaming of positive ions from the drift space backwards into the ion source. For magnetic filter field studies a plasma grid current up to 3 kA will be available as well as permanent magnets embedded into a diagnostic flange or in an external magnet frame. Furthermore different source vessels and source configurations are under discussion for BATMAN, e.g. using the AUG type racetrack RF source as driver instead of the circular one or modifying the expansion chamber for a more flexible position of the external magnet frame.

  5. The upgrade of the H.E.S.S. cameras

    NASA Astrophysics Data System (ADS)

    Giavitto, Gianluca; Ashton, Terry; Balzer, Arnim; Berge, David; Brun, Francois; Chaminade, Thomas; Delagnes, Eric; Fontaine, Gerard; Füßling, Matthias; Giebels, Berrie; Glicenstein, Jean-Francois; Gräber, Tobias; Hinton, Jim; Jahnke, Albert; Klepser, Stefan; Kossatz, Marko; Kretzschmann, Axel; Lefranc, Valentin; Leich, Holger; Lüdecke, Hartmut; Lypova, Iryna; Manigot, Pascal; Marandon, Vincent; Moulin, Emmanuel; Naurois, Mathieu de; Nayman, Patrick; Ohm, Stefan; Penno, Marek; Ross, Duncan; Salek, David; Schade, Markus; Schwab, Thomas; Simoni, Rachel; Stegmann, Christian; Steppa, Constantin; Thornhill, Julian; Toussnel, Francois

    2017-12-01

    The High Energy Stereoscopic System (HESS) is an array of imaging atmospheric Cherenkov telescopes (IACTs) located in the Khomas highland in Namibia. It was built to detect Very High Energy (VHE > 100 GeV) cosmic gamma rays. Since 2003, HESS has discovered the majority of the known astrophysical VHE gamma-ray sources, opening a new observational window on the extreme non-thermal processes at work in our universe. HESS consists of four 12-m diameter Cherenkov telescopes (CT1-4), which started data taking in 2002, and a larger 28-m telescope (CT5), built in 2012, which lowers the energy threshold of the array to 30 GeV . The cameras of CT1-4 are currently undergoing an extensive upgrade, with the goals of reducing their failure rate, reducing their readout dead time and improving the overall performance of the array. The entire camera electronics has been renewed from ground-up, as well as the power, ventilation and pneumatics systems, and the control and data acquisition software. Only the PMTs and their HV supplies have been kept from the original cameras. Novel technical solutions have been introduced, which will find their way into some of the Cherenkov cameras foreseen for the next-generation Cherenkov Telescope Array (CTA) observatory. In particular, the camera readout system is the first large-scale system based on the analog memory chip NECTAr, which was designed for CTA cameras. The camera control subsystems and the control software framework also pursue an innovative design, exploiting cutting-edge hardware and software solutions which excel in performance, robustness and flexibility. The CT1 camera has been upgraded in July 2015 and is currently taking data; CT2-4 have been upgraded in fall 2016. Together they will assure continuous operation of HESS at its full sensitivity until and possibly beyond the advent of CTA. This contribution describes the design, the testing and the in-lab and on-site performance of all components of the newly upgraded HESS camera.

  6. Space Shuttle Upgrades Advanced Hydraulic Power System

    NASA Technical Reports Server (NTRS)

    2004-01-01

    Three Auxiliary Power Units (APU) on the Space Shuttle Orbiter each provide 145 hp shaft power to a hydraulic pump which outputs 3000 psi hydraulic fluid to 41 hydraulic actuators. A hydrazine fuel powered APU utilized throughout the Shuttle program has undergone many improvements, but concerns remain with flight safety, operational cost, critical failure modes, and hydrazine related hazards. The advanced hydraulic power system (AHPS), also known as the electric APU, is being evaluated as an upgrade to replace the hydrazine APU. The AHPS replaces the high-speed turbine and hydrazine fuel supply system with a battery power supply and electric motor/pump that converts 300 volt electrical power to 3000 psi hydraulic power. AHPS upgrade benefits include elimination of toxic hydrazine propellant to improve flight safety, reduction in hazardous ground processing operations, and improved reliability. Development of this upgrade provides many interesting challenges and includes development of four hardware elements that comprise the AHPS system: Battery - The battery provides a high voltage supply of power using lithium ion cells. This is a large battery that must provide 28 kilowatt hours of energy over 99 minutes of operation at 300 volts with a peak power of 130 kilowatts for three seconds. High Voltage Power Distribution and Control (PD&C) - The PD&C distributes electric power from the battery to the EHDU. This 300 volt system includes wiring and components necessary to distribute power and provide fault current protection. Electro-Hydraulic Drive Unit (EHDU) - The EHDU converts electric input power to hydraulic output power. The EHDU must provide over 90 kilowatts of stable, output hydraulic power at 3000 psi with high efficiency and rapid response time. Cooling System - The cooling system provides thermal control of the Orbiter hydraulic fluid and EHDU electronic components. Symposium presentation will provide an overview of the AHPS upgrade, descriptions of the four hardware elements, and a summary of development results to date.

  7. EDOS Evolution to Support NASA Future Earth Sciences Missions

    NASA Technical Reports Server (NTRS)

    Cordier, Guy R.; McLemore, Bruce; Wood, Terri; Wilkinson, Chris

    2010-01-01

    This paper presents a ground system architecture to service future NASA decadal missions and in particular, the high rate science data downlinks, by evolving EDOS current infrastructure and upgrading high rate network lines. The paper will also cover EDOS participation to date in formulation and operations concepts for the respective missions to understand the particular mission needs and derived requirements such as data volumes, downlink rates, data encoding, and data latencies. Future decadal requirements such as onboard data recorder management and file protocols drive the need to emulate these requirements within the ground system. The EDOS open system modular architecture is scalable to accommodate additional missions using the current sites antennas and future sites as well and meet the data security requirements and fulfill mission's objectives

  8. Large-Scale Cryogenic Testing of Launch Vehicle Ground Systems at the Kennedy Space Center

    NASA Technical Reports Server (NTRS)

    Ernst, E. W.; Sass, J. P.; Lobemeyer, D. A.; Sojourner, S. J.; Hatfield, W. H.; Rewinkel, D. A.

    2007-01-01

    The development of a new launch vehicle to support NASA's future exploration plans requires significant redesign and upgrade of Kennedy Space Center's (KSC) launch pad and ground support equipment systems. In many cases, specialized test equipment and systems will be required to certify the function of the new system designs under simulated operational conditions, including propellant loading. This paper provides an overview of the cryogenic test infrastructure that is in place at KSC to conduct development and qualification testing that ranges from the component level to the integrated-system level. An overview of the major cryogenic test facilities will be provided, along with a detailed explanation of the technology focus area for each facility

  9. Ground wave emergency network final operational capability. Environmental assessment for southern Arkansas relay node site no. RN 8C912AR

    NASA Astrophysics Data System (ADS)

    1993-02-01

    The Ground Wave Emergency Network (GWEN) is a radio communication system designed to relay emergency messages between strategic military areas in the continental United States. The system is immune to the effects of high-attitude electromagnetic pulse (HEMP) energy surges caused by nuclear bursts in the ionosphere that would disrupt conventional communications equipment such as telephones and shortwave radios. A failure of such equipment would prevent timely communications among top military and civilian leaders and strategic Air Force locations and prevent U.S. assessment and retaliation during an attack. GWEN is an essential part of a defense modernization program to upgrade and improve our nation's communications system, thereby strengthening deterrence.

  10. Langley Aircraft Landing Dynamics Facility

    NASA Technical Reports Server (NTRS)

    Davis, Pamela A.; Stubbs, Sandy M.; Tanner, John A.

    1987-01-01

    The Langley Research Center has recently upgraded the Landing Loads Track (LLT) to improve the capability of low-cost testing of conventional and advanced landing gear systems. The unique feature of the Langley Aircraft Landing Dynamics Facility (ALDF) is the ability to test aircraft landing gear systems on actual runway surfaces at operational ground speeds and loading conditions. A historical overview of the original LLT is given, followed by a detailed description of the new ALDF systems and operational capabilities.

  11. NASCOM system development plan: System description, capabilities, and plans, FY 94-2

    NASA Technical Reports Server (NTRS)

    1994-01-01

    The Nascom System Development Plan (NSDP) for FY 94-2 contains 17 sections. It is a management document containing the approved plan for maintaining the Nascom Network System. Topics covered include an overview of Nascom systems and services, major ground communication support systems, low-speed data system, voice system, high-speed data system, Nascom support for NASA networks, Nascom planning for NASA missions, and network upgrade and advanced systems developments and plans.

  12. Examining the Process of Change in an Evidence-Based Parent Training Intervention: A Qualitative Study Grounded in the Experiences of Parents

    ERIC Educational Resources Information Center

    Holtrop, Kendal N.

    2011-01-01

    The evidence-based parent training intervention known as Parent Management Training-the Oregon Model (PMTO) is one particularly well-supported treatment approach for addressing child behavioral problems. Yet, there remains a need to further examine how this intervention promotes change. The purpose of this study was to develop a grounded theory…

  13. The Examination of the Effects of Functional Training Program Applied on Instable Ground on Anaerobic Capacities of Elite Martial Arts Athletes

    ERIC Educational Resources Information Center

    Caglayan, Atakan; Ozbar, Nurper

    2017-01-01

    The aim of this study is to measure both dynamic balance of elite martial arts athletes doing functional strength exercises on instable ground and the effects of circuit training program on their anaerobic capacities, and compare them with those following classical training program. Students studying in Faculty of Sport Sciences at Duzce…

  14. Changes in area affect figure-ground assignment in pigeons.

    PubMed

    Castro, Leyre; Lazareva, Olga F; Vecera, Shaun P; Wasserman, Edward A

    2010-03-05

    A critical cue for figure-ground assignment in humans is area: smaller regions are more likely to be perceived as figures than are larger regions. To see if pigeons are similarly sensitive to this cue, we trained birds to report whether a target appeared on a colored figure or on a differently colored background. The initial training figure was either smaller than (Experiments 1 and 2) or the same area as (Experiment 2) the background. After training, we increased or decreased the size of the figure. When the original training shape was smaller than the background, pigeons' performance improved with smaller figures (and worsened with larger figures); when the original training shape was the same area as the background, pigeons' performance worsened when they were tested with smaller figures. A smaller figural region appeared to improve the figure-ground discrimination only when size was a relevant cue in the initial discrimination.

  15. Changes in Area Affect Figure-Ground Assignment in Pigeons

    PubMed Central

    Castro, Leyre; Lazareva, Olga F.; Vecera, Shaun P.; Wasserman, Edward A.

    2010-01-01

    A critical cue for figure-ground assignment in humans is area: Smaller regions are more likely to be perceived as figures than are larger regions. To see if pigeons are similarly sensitive to this cue, we trained birds to report whether a target appeared on a colored figure or on a differently colored background. The initial training figure was either smaller than (Experiments 1 and 2) or the same area as (Experiment 2) the background. After training, we increased or decreased the size of the figure. When the original training shape was smaller than the background, pigeons’ performance improved with smaller figures (and worsened with larger figures); when the original training shape was the same area as the background, pigeons’ performance worsened when they were tested with smaller figures. A smaller figural region appeared to improve the figure-ground discrimination only when size was a relevant cue in the initial discrimination. PMID:20060406

  16. A neural network based artificial vision system for licence plate recognition.

    PubMed

    Draghici, S

    1997-02-01

    This paper presents a neural network based artificial vision system able to analyze the image of a car given by a camera, locate the registration plate and recognize the registration number of the car. The paper describes in detail various practical problems encountered in implementing this particular application and the solutions used to solve them. The main features of the system presented are: controlled stability-plasticity behavior, controlled reliability threshold, both off-line and on-line learning, self assessment of the output reliability and high reliability based on high level multiple feedback. The system has been designed using a modular approach. Sub-modules can be upgraded and/or substituted independently, thus making the system potentially suitable in a large variety of vision applications. The OCR engine was designed as an interchangeable plug-in module. This allows the user to choose an OCR engine which is suited to the particular application and to upgrade it easily in the future. At present, there are several versions of this OCR engine. One of them is based on a fully connected feedforward artificial neural network with sigmoidal activation functions. This network can be trained with various training algorithms such as error backpropagation. An alternative OCR engine is based on the constraint based decomposition (CBD) training architecture. The system has showed the following performances (on average) on real-world data: successful plate location and segmentation about 99%, successful character recognition about 98% and successful recognition of complete registration plates about 80%.

  17. 77 FR 59339 - Cross Waivers of Liability Clauses

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-27

    ... facilities and services; and (ii) All activities related to ground support, test, training, simulation, or... develop further a Payload's product or process for use other than for ISS-related activities in... (ii) All activities related to ground support, test, training, simulation, or guidance and control...

  18. 76 FR 25657 - Cross-Waiver of Liability Clauses

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-05

    ... activities related to ground support, test, training, simulation, or guidance and control equipment and... process for use other than for ISS-related activities in implementation of the IGA. (8) ``Related Entity... activities related to ground support, test, training, simulation, or guidance and control equipment, and...

  19. Energy storage and alternatives to improve train voltage on a mass transit system

    NASA Astrophysics Data System (ADS)

    Gordon, S. P.; Rorke, W. S.

    1995-04-01

    The wide separation of substations in the Bay Area Rapid Transit system's transbay tunnel contributes to voltage sag when power demand is high. In the future, expansions to the system will exacerbate this problem by increasing traffic density. Typically, this situation is remedied through the installation of additional substations to increase the system's power capacity. We have evaluated the efficacy of several alternatives to this approach - specifically, installation of an 8 megajoule energy storage system, modification of the existing substations, or reduction of the resistance of the running rails or the third rail. To support this analysis, we have developed a simple model of the traction power system in the tunnel. We have concluded that the storage system does not have sufficient capacity to deal with the expected voltage sags; in this application, the alternatives present more effective solutions. We have also investigated the potential impact of these system upgrades on expected future capital outlays by BART for traction power infrastructure additions. We have found that rail or substation upgrades may reduce the need for additional substations. These upgrades may also be effective on other parts of the BART system and on other traction power systems.

  20. Cooking Up World-Class Training.

    ERIC Educational Resources Information Center

    Zemke, Ron

    1997-01-01

    The Culinary Institute of America (CIA), a training ground for aspiring chefs, is a sophisticated training organization that practices many philosophies and techniques, including team learning, training the whole cook, and training the trainer. (JOW)

  1. Advances in Engine Test Capabilities at the NASA Glenn Research Center's Propulsion Systems Laboratory

    NASA Technical Reports Server (NTRS)

    Pachlhofer, Peter M.; Panek, Joseph W.; Dicki, Dennis J.; Piendl, Barry R.; Lizanich, Paul J.; Klann, Gary A.

    2006-01-01

    The Propulsion Systems Laboratory at the National Aeronautics and Space Administration (NASA) Glenn Research Center is one of the premier U.S. facilities for research on advanced aeropropulsion systems. The facility can simulate a wide range of altitude and Mach number conditions while supplying the aeropropulsion system with all the support services necessary to operate at those conditions. Test data are recorded on a combination of steady-state and highspeed data-acquisition systems. Recently a number of upgrades were made to the facility to meet demanding new requirements for the latest aeropropulsion concepts and to improve operational efficiency. Improvements were made to data-acquisition systems, facility and engine-control systems, test-condition simulation systems, video capture and display capabilities, and personnel training procedures. This paper discusses the facility s capabilities, recent upgrades, and planned future improvements.

  2. Wages and Skills Utilization: Effect of Broad Skills and Generic Skills on Wages in Singapore

    ERIC Educational Resources Information Center

    Ramos, Catherine R.; Ng, Michael Chi Man; Sung, Johnny; Loke, Fiona

    2013-01-01

    Many people go for training to upgrade their skills which is hoped to pave the way for better pay. But what are the kinds of skills that really affect wages? Employers have emphasized the value of generic skills such as interpersonal and communication skills, teamwork and problem solving. Does possession of these skills translate to at least the…

  3. Overcoming KC-10 Formal Training Unit Pilot Production Challenges

    DTIC Science & Technology

    2013-06-14

    their crewmembers both through initial qualification and upgrade courses. Historically, this had been the standard operating practice since...Captain Wendy Emminger from McGuire. Additionally, Ms. Pamela Bennett Bardot, the USAF Expeditionary Center librarian , was always ready to assist in any...were originally programmed (Palacios, 2013). He also stressed that units and their aircrew could swiftly go down to basic qualifications and not be

  4. Streamlining Simulation Development using a Commercial Game Engine

    DTIC Science & Technology

    2009-10-01

    few years. The realism is stunning and the Commercial Game Industry fuels the fire of cutting edge advances in hardware and immersive experiences...Technology applies to Military training in more than just the obvious upgrades in game engines and hardware. The increased visual realism and performance...elaborate storytelling and cinematic effects provide a more immersive and compelling experience to the player. The underlying game engine technology

  5. Preparing Potential Teachers for the Transition from Employment to Teacher Training: An Evaluative Case Study of a Maths Enhancement Course

    ERIC Educational Resources Information Center

    May, Steve; Gay, Jane; Atkins, Nigel; Marks-Maran, Diane

    2008-01-01

    In response to a UK government drive to improve maths teaching in schools, the South West London Maths Enhancement Course (MEC) has been set up through collaboration between three higher education institutions (HEIs) to provide an efficient route for non-maths graduates in employment to upgrade their subject knowledge and give a smooth transition…

  6. Canputer Science and Technology: Introduction to Software Packages

    DTIC Science & Technology

    1984-04-01

    Table 5 Sources of Software Packages.20 Table 6 Reference Services Matrix . 33 Table 7 Reference Matrix.40 LIST OF FIGURES Figure 1 Document...consideration should be given to the acquisition of appropriate software packages to replace or upgrade existing services and to provide services not...Consequently, there are many companies that produce only software packages, and are committed to providing training, service , and support. These vendors

  7. A New Approach in Standardising a European Curriculum in Production Engineering

    ERIC Educational Resources Information Center

    Boud, F.; Bayard, O.; Chatti, S.; Axinte, D.; Nicolescu, M.; Agirre, J.

    2009-01-01

    The need for a flexible and versatile workforce that is constantly learning and upgrading its skills has led to a continual demand for courses in which employees are re-trained and updated on a lifelong basis. Students and workers now have to be prepared for a labour market in which they can be expected to change jobs many times, and they need to…

  8. A Common Approach for the Certifying of International Space Station (ISS) Basic Hardware for Ground Safety

    NASA Technical Reports Server (NTRS)

    Kirkpatrick, Paul D.; Trinchero, Jean-Pierre

    2005-01-01

    In order to support the International Space Station, as well as any future long term human missions, vast amounts of logistical-type hardware is required to be processed through the various launch sites. This category consists of such hardware as spare parts, replacement items, and upgraded hardware. The category also includes samples for experiments and consumables. One attribute that all these items have is they are generally non-hazardous, at least to ground personnel. Even though the items are non-hazardous, launch site ground safety has a responsibility for the protection of personnel, the flight hardware, and launch site resources. In order to fulfill this responsibility, the safety organization must have knowledge of the hardware and its operations. Conversely, the hardware providers are entitled to a process that is commensurate with the hazard. Additionally, a common system should be in place that is flexible enough to account for the requirements at all launch sites, so that, the hardware provider need only complete one process for ground safety regardless of the launch site.

  9. The Effects of a 6-Week Plyometric Training Program on Agility

    PubMed Central

    Miller, Michael G.; Herniman, Jeremy J.; Ricard, Mark D.; Cheatham, Christopher C.; Michael, Timothy J.

    2006-01-01

    The purpose of the study was to determine if six weeks of plyometric training can improve an athlete's agility. Subjects were divided into two groups, a plyometric training and a control group. The plyometric training group performed in a six week plyometric training program and the control group did not perform any plyometric training techniques. All subjects participated in two agility tests: T-test and Illinois Agility Test, and a force plate test for ground reaction times both pre and post testing. Univariate ANCOVAs were conducted to analyze the change scores (post - pre) in the independent variables by group (training or control) with pre scores as covariates. The Univariate ANCOVA revealed a significant group effect F2,26 = 25.42, p=0.0000 for the T-test agility measure. For the Illinois Agility test, a significant group effect F2,26 = 27.24, p = 0.000 was also found. The plyometric training group had quicker posttest times compared to the control group for the agility tests. A significant group effect F2,26 = 7.81, p = 0.002 was found for the Force Plate test. The plyometric training group reduced time on the ground on the posttest compared to the control group. The results of this study show that plyometric training can be an effective training technique to improve an athlete's agility. Key Points Plyometric training can enhance agility of athletes. 6 weeks of plyometric training is sufficient to see agility results. Ground reaction times are decreased with plyometric training PMID:24353464

  10. Can anti-gravity running improve performance to the same degree as over-ground running?

    PubMed

    Brennan, Christopher T; Jenkins, David G; Osborne, Mark A; Oyewale, Michael; Kelly, Vincent G

    2018-03-11

    This study examined the changes in running performance, maximal blood lactate concentrations and running kinematics between 85%BM anti-gravity (AG) running and normal over-ground (OG) running over an 8-week training period. Fifteen elite male developmental cricketers were assigned to either the AG or over-ground (CON) running group. The AG group (n = 7) ran twice a week on an AG treadmill and once per week over-ground. The CON group (n = 8) completed all sessions OG on grass. Both AG and OG training resulted in similar improvements in time trial and shuttle run performance. Maximal running performance showed moderate differences between the groups, however the AG condition resulted in less improvement. Large differences in maximal blood lactate concentrations existed with OG running resulting in greater improvements in blood lactate concentrations measured during maximal running. Moderate increases in stride length paired with moderate decreases in stride rate also resulted from AG training. The use of AG training to supplement regular OG training for performance should be used cautiously, as extended use over long periods of time could lead to altered stride mechanics and reduced blood lactate.

  11. Hurricane Edouard taken by Expedition 41 crewmember

    NASA Image and Video Library

    2014-09-16

    ISS041-E-011535 (16 Sept. 2014) --- Though having been upgraded from a tropical storm to a Category 2 hurricane, the Atlantic-borne Edouard thus far has avoided land interests as it reached maximum sustained winds, churning in ocean waters several hundred miles southeast of Bermuda. The Expedition 41 crew members onboard the International Space Station photographed and distributed a series of images via station-to-ground downlinks and via social media. This photo was taken at 13:51:53 GMT on Sept. 16, 2014.

  12. Literature survey of properties of synfuels derived from coal

    NASA Technical Reports Server (NTRS)

    Reynolds, T. W.; Niedzwiecki, R. W.; Clark, J. S.

    1980-01-01

    A literature survey of the properties of synfuels for ground-based gas turbine applications is presented. Four major concepts for converting coal into liquid fuels are described: solvent extraction, catalytic liquefaction, pyrolysis, and indirect liquefaction. Data on full range syncrudes, various distillate cuts, and upgraded products are presented for fuels derived from various processes, including H-coal, synthoil, solvent-refined coal, donor solvent, zinc chloride hydrocracking, co-steam, and flash pyrolysis. Some typical ranges of data for coal-derived low Btu gases are also presented.

  13. Common command-and-control user interface for current force UGS

    NASA Astrophysics Data System (ADS)

    Stolovy, Gary H.

    2009-05-01

    The Current Force Unattended Ground Sensors (UGS) comprise the OmniSense, Scorpion, and Silent Watch systems. As deployed by U.S. Army Central Command in 2006, sensor reports from the three systems were integrated into a common Graphical User Interface (GUI), with three separate vendor-specific applications for Command-and-Control (C2) functions. This paper describes the requirements, system architecture, implementation, and testing of an upgrade to the Processing, Exploitation, and Dissemination back-end server to incorporate common remote Command-and-Control capabilities.

  14. British and French Strategic Nuclear Force Modernization: Programs, Strategies, and Implications

    DTIC Science & Technology

    1989-12-01

    Union . In addition 18 Mirage IVs will be fitted with ASMP (Air-Sol Moyenne Port’e) medium-range air to ground missiles with increased standoff capability...Chevaline upgrade to the Polaris A3 missiles in 1972 following the signing of the ABM Treaty between the United States and Soviet Union . This decision...Royal Navy Headquarters at Northwood to its Polaris submarines the U.K. relies upon three VLF (very low frequency) transmitters at 24 CrIgglon, Rugby

  15. Experimental Demonstration of an Algorithm to Detect the Presence of a Parasitic Satellite

    DTIC Science & Technology

    2003-03-01

    Chile (FASat- Alfa/Bravo), South Africa (UoSAT-3/4/5), Thailand (TMSAT-1), Sin- 1-2 gapore (Merlion payload), and Malaysia (TiungSAT-1). Recently...original configuration. 3.3.1 Hardware. The ground-station computer has been upgraded from the original configuration to a Dell r© Dimension r© Model...1◦/ hr accuracy. This is expected to be a two order of magnitude improvement. It is approximately the same size as the current gyroscope for simple

  16. Overview of graduate training program of John Adams Institute for Accelerator Science

    NASA Astrophysics Data System (ADS)

    Seryi, Andrei

    The John Adams Institute for Accelerator Science is a center of excellence in the UK for advanced and novel accelerator technology, providing expertise, research, development and training in accelerator techniques, and promoting advanced accelerator applications in science and society. We work in JAI on design of novel light sources upgrades of 3-rd generation and novel FELs, on plasma acceleration and its application to industrial and medical fields, on novel energy recovery compact linacs and advanced beam diagnostics, and many other projects. The JAI is based on three universities - University of Oxford, Imperial College London and Royal Holloway University of London. Every year 6 to 10 accelerators science experts, trained via research on cutting edge projects, defend their PhD thesis in JAI partner universities. In this presentation we will overview the research and in particular the highly successful graduate training program in JAI.

  17. A Grounded Theory Study of Supervision of Preservice Consultation Training

    ERIC Educational Resources Information Center

    Newman, Daniel S.

    2012-01-01

    The purpose of this study was to explore a university-based supervision process for consultants-in-training (CITs) engaged in a preservice level consultation course with applied practicum experience. The study was approached from a constructivist worldview using a grounded theory methodology. Data consisted of supervision session transcripts,…

  18. Ground Combat Training Squadron Complex Final Environmental Assessment

    DTIC Science & Technology

    2011-08-01

    Std Z39-18 FINAL FINDING OF NO SIGNIFICANT IMPACT FROM CONSTRUCTION OF THE GROUND COMBAT TRAINING SQUADRON COMPLEX AT EGLIN AIR FORCE BASE...of and Adjacent to the Triangle (EA Section 2.4.1, Page 2-10): This location was eliminated due to possibly unavoidable impacts to wetlands, which run...through part of this site. To eliminate any potential for impacts to wetlands, this alternative was dismissed. Training in an Area Northwest of

  19. An Alternative Approach to Human Servicing of Crewed Earth Orbiting Spacecraft

    NASA Technical Reports Server (NTRS)

    Mularski, John R.; Alpert, Brian K.

    2017-01-01

    As crewed spacecraft have grown larger and more complex, they have come to rely on spacewalks, or Extravehicular Activities (EVA), for assembly and to assure mission success. Typically, these spacecraft maintain all of the hardware and trained personnel needed to perform an EVA on-board at all times. Maintaining this capability requires up-mass, volume for storage of EVA hardware, crew time for ground and on-orbit training, and on-orbit maintenance of EVA hardware. This paper proposes an alternative methodology, utilizing either launch-on-need hardware and crew or regularly scheduled missions to provide EVA capability for space stations in low Earth orbit after assembly complete. Much the same way that one would call a repairman to fix something at their home these EVAs are dedicated to maintenance and upgrades of the orbiting station. For crew safety contingencies it is assumed the station would be designed such the crew could either solve those issues from inside the spacecraft or use the docked Earth to Orbit vehicles as a return lifeboat, in the same manner as the International Space Station (ISS) which does not rely on EVA for crew safety related contingencies. This approach would reduce ground training requirements for long duration crews, save Intravehicular Activity (IVA) crew time in the form of EVA hardware maintenance and on-orbit training, and lead to more efficient EVAs because they would be performed by specialists with detailed knowledge and training stemming from their direct involvement in the development of the EVA. The on-orbit crew would then be available to focus on the immediate response to any failures such as IVA systems reconfiguration or jumper installation as well as the day-to-day operations of the spacecraft and payloads. This paper will look at how current unplanned EVAs are conducted on ISS, including the time required for preparation, and offer an alternative for future spacecraft. As this methodology relies on the on-time and on-need launch of spacecraft, any space station that utilized this approach would need a robust transportation system, possibly including more than one launch vehicle capable of carrying crew. In addition, the fault tolerance of the future space station would be an important consideration in how much time was available for EVA preparation after the failure. Ideally the fault tolerance of the station would allow for the maintenance tasks to be grouped such that they could be handled by regularly scheduled maintenance visits and not contingency launches. Each future program would have to weigh the risk of on-time launch against the increase in available crew time for the main objective of the spacecraft. This is only one of several ideas that could be used to reduce or eliminate a station's reliance on rapid turnaround EVAs using on-board crew. Others could include having shirt-sleeve access to critical systems or utilizing low pressure temporarily pressurized equipment bays.

  20. Looking towards gravitational wave detection

    NASA Astrophysics Data System (ADS)

    Barsotti, Lisa

    2009-05-01

    It is an exciting time in gravitational wave research. The first generation ground detectors, which aim to detect gravitational waves in the audio-frequency region, have been successfully operated at their design sensitivity. One integrated year of coincident data from the three LIGO interferometers in United States has been collected between 2005 and 2007, in partial coincidence with the two European detectors, VIRGO and GEO. All the detectors are currently being upgraded, and they will come back on-line in the next few months with a factor 2 better sensitivity. A major upgrade of LIGO and VIRGO, scheduled to happen immediately after their upcoming science runs, will bring on-line second generation detectors 4 years from now. Their sensitivity is designed to be 10 times better than the first generation detectors, resulting in an expected event rate of at least a few per year. Looking farther into the future, space-based detectors such as LISA propose to cover a lower range of frequencies which are inaccessible on Earth, enhancing the opportunity of understanding our Universe trough gravitational waves.

  1. KSC-2014-2413

    NASA Image and Video Library

    2014-05-06

    CAPE CANAVERAL, Fla. – Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. A large crane is situated next to the ML for lifting of heavy metal beams and other construction materials. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program office at Kennedy. The existing 24-foot exhaust hole is being enlarged and strengthened for the larger, heavier SLS rocket. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first mission, Exploration Mission-1, in 2017. Photo credit: NASA/Daniel Casper

  2. Applications of intelligent computer-aided training

    NASA Technical Reports Server (NTRS)

    Loftin, R. B.; Savely, Robert T.

    1991-01-01

    Intelligent computer-aided training (ICAT) systems simulate the behavior of an experienced instructor observing a trainee, responding to help requests, diagnosing and remedying trainee errors, and proposing challenging new training scenarios. This paper presents a generic ICAT architecture that supports the efficient development of ICAT systems for varied tasks. In addition, details of ICAT projects, built with this architecture, that deliver specific training for Space Shuttle crew members, ground support personnel, and flight controllers are presented. Concurrently with the creation of specific ICAT applications, a general-purpose software development environment for ICAT systems is being built. The widespread use of such systems for both ground-based and on-orbit training will serve to preserve task and training expertise, support the training of large numbers of personnel in a distributed manner, and ensure the uniformity and verifiability of training experiences.

  3. Credential Attainment by Older Workers: The Role of Community Colleges and the Dislocated Worker Program in Successful Employment Outcomes

    ERIC Educational Resources Information Center

    Cummins, Phyllis Ann

    2013-01-01

    Workers are remaining in the labor force at older ages and despite their desire to work, those without jobs face unprecedented durations of unemployment. Many of the unemployed lack current skills for jobs in demand and need to either upgrade their skills or be trained for a new occupation to become reemployed. An aging workforce combined with…

  4. Lincoln Laboratory Journal. Volume 22, Number 1, 2016

    DTIC Science & Technology

    2016-06-09

    needs cyber ranges and other infrastructure to conduct scal- able, repeatable, scientific, realistic and inexpensive testing, training, and mission...support this mission, infrastructure is being upgraded to make it more efficient and secure. In “Secur- ing the U.S. Transportation Command,” Jeff...using the Electronic Key Management System (EKMS) or over a digital network by using the Key Manage- ment Infrastructure (KMI). The units must then

  5. Improving Soldier Training: An Aptitude-Treatment Interaction Approach.

    DTIC Science & Technology

    1979-06-01

    magazines. Eighteen percent of American adults lack basic literacy skills to the point where they cannot even fill out basic forms. Dr. Food emphasized...designed to upgrade the literacy and computational skills of Army personnel found deficient. The magnitude of the problem is such, however, that the services...knowledge, (WK); arithmetic reasoning, AR); etc.) predict the aiount learned or the rate of learning or both. Special abilities such as psychomotor skills

  6. Learning from Experience: A New Approach for Teacher Upgrading = Apprendre par l'experience: Une nouvelle approche en matiere de formation et de perfectionnement des enseignants. Notes, Comments...No. 190.

    ERIC Educational Resources Information Center

    Barkatoolah, Amina B. S.

    Two of Unesco's major education programs, the universalizaation of basic education and literacy education, have emphasized the need for teachers trained in their particular disciplines and pedagogical techniques. Developing countries, faced with a shortage of qualified teachers, have realized that they cannot rely solely on the formal education…

  7. Strategy for Upgrading Preparedness in Small and Rural Communities to Meet National Preparedness Standards

    DTIC Science & Technology

    2010-12-01

    National Academy of Public Administration NEMA National Emergency Managers Association xii NICC National Infrastructure Coordinating Center NIMS...2003, p. 3). A blunt conclusion stated succinctly in the 2008 study conducted by the National Emergency Managers Association ( NEMA ) on barriers to...NIMS compliance speaks to the heart of the issue: “Poorer, rural states can’t meet implementation, training, compliance requirements” ( NEMA , 2008

  8. Documentation of the Santa Clara Valley regional ground-water/surface-water flow model, Santa Clara Valley, California

    USGS Publications Warehouse

    Hanson, R.T.; Li, Zhen; Faunt, C.C.

    2004-01-01

    The Santa Clara Valley is a long, narrow trough extending about 35 miles southeast from the southern end of San Francisco Bay where the regional alluvial-aquifer system has been a major source of water. Intensive agricultural and urban development throughout the 20th century and related ground-water development resulted in ground-water-level declines of more than 200 feet and land subsidence of as much as 12.7 feet between the early 1900s and the mid-1960s. Since the 1960s, Santa Clara Valley Water District has imported surface water to meet growing demands and reduce dependence on ground-water supplies. This importation of water has resulted in a sustained recovery of the ground-water flow system. To help support effective management of the ground-water resources, a regional ground-water/surface-water flow model was developed. This model simulates the flow of ground water and surface water, changes in ground-water storage, and related effects such as land subsidence. A numerical ground-water/surface-water flow model of the Santa Clara Valley subbasin of the Santa Clara Valley was developed as part of a cooperative investigation with the Santa Clara Valley Water District. The model better defines the geohydrologic framework of the regional flow system and better delineates the supply and demand components that affect the inflows to and outflows from the regional ground-water flow system. Development of the model includes revisions to the previous ground-water flow model that upgraded the temporal and spatial discretization, added source-specific inflows and outflows, simulated additional flow features such as land subsidence and multi-aquifer wellbore flow, and extended the period of simulation through September 1999. The transient-state model was calibrated to historical surface-water and ground-water data for the period 197099 and to historical subsidence for the period 198399. The regional ground-water flow system consists of multiple aquifers that are grouped into upper- and lower-aquifer systems. Ground-water inflow occurs as natural recharge in the form of streamflow infiltration and areal infiltration of precipitation along stream channels, artificial recharge from infiltration of imported water at recharge ponds and along selected stream channels, and leakage along selected transmission pipelines. Ground-water outflow occurs as evapotranspiration, stream base flow, discharge through pumpage from wells, and subsurface flow to the San Francisco Bay. The geohydrologic framework of the regional ground-water flow system was represented as six model layers. The hydraulic properties were redefined on the basis of cell-based lithologic properties that were delineated in terms of aggregate thicknesses of coarse-grained, fine-grained, and mixed textural categories. The regional aquifer systems also are dissected by several laterally extensive faults that may form at least partial barriers to the lateral flow of ground water. The spatial extent of the ground-water flow model was extended and refined to cover the entire Santa Clara Valley, including the Evergreen subregion. The temporal discretization was refined and the period of simulation was extended to 197099. The model was upgraded to MODFLOW-2000 (MF2K) and was calibrated to fit historical ground-water levels, streamflow, and land subsidence for the period 197099. The revised model slightly overestimates measured water levels with an root-mean-square error of -7.34 feet. The streamflow generally shows a good match on gaged creeks and rivers for flows greater than 1.2 cubic feet per second. The revised model also fits the measured deformation at the borehole extensometer site located near San Jose within 16 to 27 percent and the extensometer site near Sunnyvale within 3 percent of the maximum measured seasonal deformation for the deepest extensometers. The total ground-water inflow and outflow of about 225,500 acre-feet per

  9. Spatial prediction of ground subsidence susceptibility using an artificial neural network.

    PubMed

    Lee, Saro; Park, Inhye; Choi, Jong-Kuk

    2012-02-01

    Ground subsidence in abandoned underground coal mine areas can result in loss of life and property. We analyzed ground subsidence susceptibility (GSS) around abandoned coal mines in Jeong-am, Gangwon-do, South Korea, using artificial neural network (ANN) and geographic information system approaches. Spatial data of subsidence area, topography, and geology, as well as various ground-engineering data, were collected and used to create a raster database of relevant factors for a GSS map. Eight major factors causing ground subsidence were extracted from the existing ground subsidence area: slope, depth of coal mine, distance from pit, groundwater depth, rock-mass rating, distance from fault, geology, and land use. Areas of ground subsidence were randomly divided into a training set to analyze GSS using the ANN and a test set to validate the predicted GSS map. Weights of each factor's relative importance were determined by the back-propagation training algorithms and applied to the input factor. The GSS was then calculated using the weights, and GSS maps were created. The process was repeated ten times to check the stability of analysis model using a different training data set. The map was validated using area-under-the-curve analysis with the ground subsidence areas that had not been used to train the model. The validation showed prediction accuracies between 94.84 and 95.98%, representing overall satisfactory agreement. Among the input factors, "distance from fault" had the highest average weight (i.e., 1.5477), indicating that this factor was most important. The generated maps can be used to estimate hazards to people, property, and existing infrastructure, such as the transportation network, and as part of land-use and infrastructure planning.

  10. Experimental investigation of railway train-induced vibrations of surrounding ground and a nearby multi-story building

    NASA Astrophysics Data System (ADS)

    Xia, He; Chen, Jianguo; Wei, Pengbo; Xia, Chaoyi; de Roeck, G.; Degrande, G.

    2009-03-01

    In this paper, a field experiment was carried out to study train-induced environmental vibrations. During the field experiment, velocity responses were measured at different locations of a six-story masonry structure near the Beijing-Guangzhou Railway and along a small road adjacent to the building. The results show that the velocity response levels of the environmental ground and the building floors increase with train speed, and attenuate with the distance to the railway track. Heavier freight trains induce greater vibrations than lighter passenger trains. In the multi-story building, the lateral velocity levels increase monotonically with floor elevation, while the vertical ones increase with floor elevation in a fluctuating manner. The indoor floor vibrations are much lower than the outdoor ground vibrations. The lateral vibration of the building along the direction of weak structural stiffness is greater than along the direction with stronger stiffness. A larger room produces greater floor vibrations than the staircase at the same elevation, and the vibration at the center of a room is greater than at its corner. The vibrations of the building were compared with the Federal Transportation Railroad Administration (FTA) criteria for acceptable ground-borne vibrations expressed in terms of rms velocity levels in decibels. The results show that the train-induced building vibrations are serious, and some exceed the allowance given in relevant criterion.

  11. NYSERDA's Green Jobs-Green New York Program: Extending Energy Efficiency Financing To Underserved Households

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zimring, Mark; Fuller, Merrian

    2011-01-24

    The New York legislature passed the Green Jobs-Green New York (GJGNY) Act in 2009. Administered by the New York State Energy Research and Development Authority (NYSERDA), GJGNY programs provide New Yorkers with access to free or low-cost energy assessments,1 energy upgrade services,2 low-cost financing, and training for various 'green-collar' careers. Launched in November 2010, GJGNY's residential initiative is notable for its use of novel underwriting criteria to expand access to energy efficiency financing for households seeking to participate in New York's Home Performance with Energy Star (HPwES) program.3 The GJGNY financing program is a valuable test of whether alternatives tomore » credit scores can be used to responsibly expand credit opportunities for households that do not qualify for traditional lending products and, in doing so, enable more households to make energy efficiency upgrades.« less

  12. Characteristics of train noise in above-ground and underground stations with side and island platforms

    NASA Astrophysics Data System (ADS)

    Shimokura, Ryota; Soeta, Yoshiharu

    2011-04-01

    Railway stations can be principally classified by their locations, i.e., above-ground or underground stations, and by their platform styles, i.e., side or island platforms. However, the effect of the architectural elements on the train noise in stations is not well understood. The aim of the present study is to determine the different acoustical characteristics of the train noise for each station style. The train noise was evaluated by (1) the A-weighted equivalent continuous sound pressure level ( LAeq), (2) the amplitude of the maximum peak of the interaural cross-correlation function (IACC), (3) the delay time ( τ1) and amplitude ( ϕ1) of the first maximum peak of the autocorrelation function. The IACC, τ1 and ϕ1 are related to the subjective diffuseness, pitch and pitch strength, respectively. Regarding the locations, the LAeq in the underground stations was 6.4 dB higher than that in the above-ground stations, and the pitch in the underground stations was higher and stronger. Regarding the platform styles, the LAeq on the side platforms was 3.3 dB higher than on the island platforms of the above-ground stations. For the underground stations, the LAeq on the island platforms was 3.3 dB higher than that on the side platforms when a train entered the station. The IACC on the island platforms of the above-ground stations was higher than that in the other stations.

  13. ISS emergency scenarios and a virtual training simulator for Flight Controllers

    NASA Astrophysics Data System (ADS)

    Uhlig, Thomas; Roshani, Frank-Cyrus; Amodio, Ciro; Rovera, Alessandro; Zekusic, Nikola; Helmholz, Hannes; Fairchild, Matthew

    2016-11-01

    The current emergency response concept for the International Space Station (ISS) includes the support of the Flight Control Team. Therefore, the team members need to be trained in emergencies and the corresponding crew procedures to ensure a smooth collaboration between crew and ground. In the case where the astronaut and ground personnel training is not collocated it is a challenging endeavor to ensure and maintain proper knowledge and skills for the Flight Control Team. Therefore, a virtual 3D simulator at the Columbus Control Center (Col-CC) is presented, which is used for ground personnel training in the on-board emergency response. The paper briefly introduces the main ISS emergency scenarios and the corresponding response strategy, details the resulting learning objectives for the Flight Controllers and elaborates on the new simulation method, which will be used in the future. The status of the 3D simulator, first experiences and further plans are discussed.

  14. Ground vibrations from heavy freight trains

    NASA Astrophysics Data System (ADS)

    Dawn, T. M.

    1983-03-01

    Ground vibration from heavy freight trains on good quality welded track are found to have only a weak dependence on train speed above 30 km/h. At the site on which these tests were carried out a critical speed was found at which the vibration reached a peak. The frequencies of vibration produced appear to be functions of track and vehicle dimensions and the critical speed occurs at the coincidence of sleeper passage frequency and the total vehicle on track resonance frequency.

  15. Current Practices in Resident Assistant Training

    ERIC Educational Resources Information Center

    Koch, Virginia Albaneso

    2016-01-01

    Developing resident assistant (RA) training is a challenge for most housing and residence life staff. Grounded in the author's doctoral research on the curricular design of RA training programs, this study summarizes current practices in three types of RA training programs--preservice training, in-service training, and academic courses--and…

  16. Self-criticism in therapist training: A grounded theory analysis.

    PubMed

    Kannan, Divya; Levitt, Heidi M

    2017-03-01

    The primary objective of this study is to engender an understanding of how therapists-in-training experience and cope with self-criticism in the context of their clinical training and therapy experiences. In this study, trainees were interviewed about their experience of self-criticism related to psychotherapy practice and these interviews were subjected to a grounded theory analysis generating a core self-critical process. The analysis highlighted the vulnerability of self-criticism in therapists' training experiences, especially when they related to balancing the "expert" role while maintaining authentic interactions with their clients. The results also described ways in which self-criticism is mitigated by a sense of interpersonal safety and the provision of clinical freedom and flexibility in therapists' training. The implications for future psychotherapy research and clinical training within clinical training environments are discussed.

  17. A Grounded Theory of Western-Trained Asian Group Leaders Leading Groups in Asia

    ERIC Educational Resources Information Center

    Taephant, Nattasuda; Rubel, Deborah; Champe, Julia

    2015-01-01

    This grounded theory research explored the experiences of Western-trained Asian group leaders leading groups in Asia. A total of 6 participants from Japan, Taiwan, and Thailand were interviewed 3 times over 9 months. The recursive process of data collection and analysis yielded substantive theory describing the participants' process of reconciling…

  18. Principal Training on the Ground: Ensuring Highly Qualified Leadership

    ERIC Educational Resources Information Center

    Buck, Janiece T.

    2004-01-01

    Assuming the quality of the principal is directly linked to student learning and instruction, whose responsibility is it to develop building administrators to their fullest? This question is at the center of Principal Training on the Ground by Sandra Stein and colleagues from the School of Public Affairs at Baruch College of the City University of…

  19. 78 FR 11632 - Record of Decision for Land Acquisition and Airspace Establishment To Support Large-Scale Marine...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-19

    ... Establishment To Support Large-Scale Marine Air Ground Task Force Live- Fire and Maneuver Training at the Marine...), announces its decision to establish a large-scale Marine Air Ground Task Force (MAGTF) training facility at... through the Federal Aviation Administration the establishment and modification of military Special Use...

  20. Field measurements and analyses of environmental vibrations induced by high-speed Maglev.

    PubMed

    Li, Guo-Qiang; Wang, Zhi-Lu; Chen, Suwen; Xu, You-Lin

    2016-10-15

    Maglev, offers competitive journey-times compared to the railway and subway systems in markets for which distance between the stations is 100-1600km owing to its high acceleration and speed; however, such systems may have excessive vibration. Field measurements of Maglev train-induced vibrations were therefore performed on the world's first commercial Maglev line in Shanghai, China. Seven test sections along the line were selected according to the operating conditions, covering speeds from 150 to 430km/h. Acceleration responses of bridge pier and nearby ground were measured in three directions and analyzed in both the time and frequency domain. The effects of Maglev train speed on vibrations of the bridge pier and ground were studied in terms of their peak accelerations. Attenuation of ground vibration was investigated up to 30m from the track centerline. Effects of guideway configuration were also analyzed based on the measurements through two different test sections with same train speed of 300km/h. The results showed that peak accelerations exhibited a strong correlation with both train speed and distance off the track. Guideway configuration had a significant effect on transverse vibration, but a weak impact on vertical and longitudinal vibrations of both bridge pier and ground. Statistics indicated that, contrary to the commonly accepted theory and experience, vertical vibration is not always dominant: transverse and longitudinal vibrations should also be considered, particularly near turns in the track. Moreover, measurements of ground vibration induced by traditional high-speed railway train were carried out with the same testing devices in Bengbu in the Anhui Province. Results showed that the Maglev train generates significantly different vibration signatures as compared to the traditional high-speed train. The results obtained from this paper can provide good insights on the impact of Maglev system on the urban environment and the quality of human life nearby. Copyright © 2016 Elsevier B.V. All rights reserved.

  1. A School and Work Program in An Adult Manpower Setting for Potential Dropouts Needing Educational Redirection. Evaluation of State Urban Education Programs in New York City 1968-69.

    ERIC Educational Resources Information Center

    Flicker, Bernard

    The objectives of this High School Redirection Project were to redirect potential dropouts to continue full-time education and training with an educational-vocational plan, to provide high school dropouts with job skills that will enable them to enter the labor market on the highest possible level while continuing to upgrade their skills on a…

  2. Empirical Analysis of the Effectiveness of Teacher Distance Education (TDE) in Ghana: The Perception of Student Teachers, Tutors and Coordinators of the University of Education, Winneba (UEW)

    ERIC Educational Resources Information Center

    Attah-Mensah, Godwin; Acheampong, Alex Opoku; Nti- Adarkwah, Samuel

    2016-01-01

    Education has proven to be an effective means of developing the human resource base of most nations and could advance the development of nations. In other to upgrade and train more professionals and non-professionals in the sphere of education, the concept of teacher distance education has gained more attention globally. Therefore, more and new…

  3. Analysis of FY79 Army Aircraft Accidents.

    DTIC Science & Technology

    1980-04-01

    maintenance and field manuals . *.7 "reel world" Army operations. It Includes detailed lemons Additional requirmnent indifId by the results of the le-a...and 2. Emphb and direction to upgrade training at unit trufe of akrraft control, and school levels. R% eview the current aulons nd manuals to 3. Unit...Evaluation and revision of Army regulations, e Evluate effectiveness of programs desgned to technical manuals , field manuals , and other written Insure

  4. Challenges in managing postpartum hemorrhage in resource-poor countries.

    PubMed

    Karoshi, Mahantesh; Keith, Louis

    2009-06-01

    Managing postpartum hemorrhage depends in part on having a prepared mind, a complement of trained coworkers, and full access to modern therapies. The last 2 components are rare in resource-poor areas and their absence may be accentuated by climatic instability and lack of basic transportation. Greater use of the active management of third stage of labor and administration of misoprostol by nontrained birth attendants will provide beneficial reductions in hemorrhage rates in resource-poor areas. Additional improvements depend on increasing public awareness, facilitating existing nongovernmental organizations in their community-related, upgrading training of traditional birth attendants, and providing cell phone communication to workers in remote areas, in addition to providing better access to blood.

  5. KSC-04pd1658

    NASA Image and Video Library

    2004-08-05

    KENNEDY SPACE CENTER, FLA. - After the ribbon cutting for the Enhanced Firing Range on Schwartz Rd. at Kennedy Space Center, guests get a close look at the new “rifle-grade” shoot house. NASA’s Federal Law Enforcement Training Academy’s firing range upgrades also include a portable, tactical “shoot-back” trailer for cover and concealment drills, automated running targets and a new classroom. They are added to the existing three firearms ranges, “pistol-grade” shoot house, obstacle course and rappel tower. NASA’s Security Management and Safeguards Office funded the enhancements in order to improve ability to train the KSC security force and to support local, state and federal law enforcement agencies in Homeland Security.

  6. KSC-04pd1657

    NASA Image and Video Library

    2004-08-05

    KENNEDY SPACE CENTER, FLA. - At the ribbon cutting for the Enhanced Firing Range on Schwartz Rd. at Kennedy Space Center, a SWAT team demonstrates use of the facility. NASA’s Federal Law Enforcement Training Academy’s firing range has been upgraded to include a “rifle-grade” shoot house, a portable, tactical “shoot-back” trailer for cover and concealment drills, automated running targets and a new classroom. They are added to the existing three firearms ranges, “pistol-grade” shoot house, obstacle course and rappel tower. NASA’s Security Management and Safeguards Office funded the enhancements in order to improve ability to train the KSC security force and to support local, state and federal law enforcement agencies in Homeland Security.

  7. KSC-04pd1651

    NASA Image and Video Library

    2004-08-05

    KENNEDY SPACE CENTER, FLA. - Center Director Jim Kennedy addresses guests at the ribbon cutting for the Enhanced Firing Range on Schwartz Rd. at Kennedy Space Center. NASA’s Federal Law Enforcement Training Academy’s firing range has been upgraded to include a “rifle-grade” shoot house, a portable, tactical “shoot-back” trailer for cover and concealment drills, automated running targets and a new classroom facility. They are added to the existing three firearms ranges, “pistol-grade” shoot house, obstacle course and rappel tower. NASA’s Security Management and Safeguards Office funded the enhancements in order to improve ability to train the KSC security force and to support local, state and federal law enforcement agencies in Homeland Security.

  8. ASCAN Helms simulates parachute jump during VAFB training exercises

    NASA Technical Reports Server (NTRS)

    1990-01-01

    1990 Group 13 Astronaut Candidate (ASCAN) Susan J. Helms simulates a parachute jump during ground egress and parasail training exercises at Vance Air Force Base (VAFB), Enid, Oklahoma. With her arms folded against her chest, Helms jumps from a brick platform onto the ground. In line behind her are Charles J. Precourt followed by Leroy Chiao. The training is designed to prepare the ASCANs for proper survival measures to take in the event of an emergency aboard the T-38 jet trainer aircraft they will frequently use once they become full-fledged astronauts. ASCANs completed the VAFB training courses from 07-29-90 through 07-31-90.

  9. Thermal energy supply optimization for Edgewood Area, US Army Aberdeen Proving Ground: Energy supply alternatives. Final report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McCammon, T.L.; Dilks, C.L.; Savoie, M.J.

    1995-09-01

    Relatively poor performance at the aging central heating plants (OH Ps) and planned changes in steam demand at Aberdeen Proving Ground (APG) Edgewood Area, Aberdeen, MD warranted an investigation of alternatives for providing thermal energy to the installation. This study: (1) evaluated the condition of the APG CHPs and heat distribution system, (2) identified thermal energy supply problems and cost-effective technologies to maintain APG`s capability to produce and distribute the needed thermal energy, and (3) recommended renovation and modernization projects for the system. Heating loads were analyzed using computer simulations, and life cycle costs were developed for each alternative. Recommendedmore » alternatives included upgrading the existing system, installing new boilers, consolidating the central heating plants, and introducing the use of absorption chilling.« less

  10. Use of on-site high performance liquid chromatography to evaluate the magnitude and extent of organic contaminants in aquifers

    USGS Publications Warehouse

    Goerlitz, D.F.; Franks, B.J.

    1989-01-01

    Appraisal of ground water contaminated by organic substances raises problems of difficult sample collection and timely chemical analysis. High-performance liquid chromatography was evaluated for on-site determination of specific organic contaminants in ground water samples and was used at three study sites. Organic solutes were determined directly in water samples, with little or no preparation, and usually in less than an hour after collection. This information improved sampling efficiency and was useful in screening for subsequent laboratory analysis. On two occasions, on-site analysis revealed that samples were undergoing rapid change, with major solutes being upgraded and alteration products being formed. In addition to sample stability, this technique proved valuable for monitoring other sampling factors such as compositional changes with respect to pumping, filtration, and cross contamination. -Authors

  11. Characterization of biomass waste torrefaction under conventional and microwave heating.

    PubMed

    Ho, Shih-Hsin; Zhang, Congyu; Chen, Wei-Hsin; Shen, Ying; Chang, Jo-Shu

    2018-05-13

    To evaluate the potential of microwave heating for biomass torrefaction, the torrefaction performances and energy utilization of coffee grounds and microalga residue, under conventional and microwave heating were investigated and compared with each other. For the two biomass samples, the dehydrogenation of the coffee grounds was more sensitive to torrefaction severity, whereas the microalga residue consumed more energy under the same torrefaction conditions. Microwave heating under lower torrefaction severity had a higher energy efficiency. As regard to the lower solid yields or higher torrefaction severity, the energy efficiency of microwave heating was close to that of conventional heating, irrespective of the feedstocks. This revealed the comparable energy consumption state between the two heating modes. Accordingly, it is concluded that microwave torrefaction is more efficient for biomass upgrading and densification than conventional torrefaction. Copyright © 2018 Elsevier Ltd. All rights reserved.

  12. KSC-2014-3379

    NASA Image and Video Library

    2014-08-06

    CAPE CANAVERAL, Fla. – Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. The ML is being modified and strengthened to accommodate the weight, size and thrust at launch of NASA's Space Launch System, or SLS, and Orion spacecraft. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program at Kennedy. The existing 24-foot exhaust hole is being enlarged and strengthened for the larger, heavier SLS rocket. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first mission, Exploration Mission-1, in 2017. Photo credit: NASA/Dimitri Gerondidakis

  13. KSC-2014-2702

    NASA Image and Video Library

    2014-05-28

    CAPE CANAVERAL, Fla. -- Construction workers on lifts continue modifications underneath the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. Sections of the ML are being modified and strengthened to accommodate the weight, size and thrust at launch of NASA's Space Launch System and Orion spacecraft. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program office at Kennedy. The existing 24-foot exhaust hole is being enlarged and strengthened for the larger, heavier SLS rocket. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first mission, Exploration Mission-1, in 2017. Photo credit: NASA/Daniel Casper

  14. KSC-2014-3378

    NASA Image and Video Library

    2014-08-06

    CAPE CANAVERAL, Fla. – Modifications continue on the Mobile Launcher, or ML, at the Mobile Launcher Park Site at NASA’s Kennedy Space Center in Florida. The ML is being modified and strengthened to accommodate the weight, size and thrust at launch of NASA's Space Launch System, or SLS, and Orion spacecraft. In 2013, the agency awarded a contract to J.P. Donovan Construction Inc. of Rockledge, Fla., to modify the ML, which is one of the key elements of ground support equipment that is being upgraded by the Ground Systems Development and Operations Program at Kennedy. The existing 24-foot exhaust hole is being enlarged and strengthened for the larger, heavier SLS rocket. The ML will carry the SLS rocket and Orion spacecraft to Launch Pad 39B for its first mission, Exploration Mission-1, in 2017. Photo credit: NASA/Dimitri Gerondidakis

  15. Real-time GPS integration for prototype earthquake early warning and near-field imaging of the earthquake rupture process

    NASA Astrophysics Data System (ADS)

    Hudnut, K. W.; Given, D.; King, N. E.; Lisowski, M.; Langbein, J. O.; Murray-Moraleda, J. R.; Gomberg, J. S.

    2011-12-01

    Over the past several years, USGS has developed the infrastructure for integrating real-time GPS with seismic data in order to improve our ability to respond to earthquakes and volcanic activity. As part of this effort, we have tested real-time GPS processing software components , and identified the most robust and scalable options. Simultaneously, additional near-field monitoring stations have been built using a new station design that combines dual-frequency GPS with high quality strong-motion sensors and dataloggers. Several existing stations have been upgraded in this way, using USGS Multi-Hazards Demonstration Project and American Recovery and Reinvestment Act funds in southern California. In particular, existing seismic stations have been augmented by the addition of GPS and vice versa. The focus of new instrumentation as well as datalogger and telemetry upgrades to date has been along the southern San Andreas fault in hopes of 1) capturing a large and potentially damaging rupture in progress and augmenting inputs to earthquake early warning systems, and 2) recovering high quality recordings on scale of large dynamic displacement waveforms, static displacements and immediate and long-term post-seismic transient deformation. Obtaining definitive records of large ground motions close to a large San Andreas or Cascadia rupture (or volcanic activity) would be a fundamentally important contribution to understanding near-source large ground motions and the physics of earthquakes, including the rupture process and friction associated with crack propagation and healing. Soon, telemetry upgrades will be completed in Cascadia and throughout the Plate Boundary Observatory as well. By collaborating with other groups on open-source automation system development, we will be ready to process the newly available real-time GPS data streams and to fold these data in with existing strong-motion and other seismic data. Data from these same stations will also serve the very practical purpose of enabling earthquake early warning and greatly improving rapid finite-fault source modeling. Multiple uses of the effectively very broad-band data obtained by these stations, for operational and research purposes, are bound to occur especially because all data will be freely, openly and instantly available.

  16. NASA Near Earth Network (NEN) Support for Lunar and L1/L2 CubeSats

    NASA Technical Reports Server (NTRS)

    Schaire, Scott; Altunc, Serhat; Wong, Yen; Shelton, Marta; Celeste, Peter; Anderson, Michael; Perrotto, Trish

    2017-01-01

    The NASA Near Earth Network (NEN) consists of globally distributed tracking stations, including NASA, commercial, and partner ground stations, that are strategically located to maximize the coverage provided to a variety of orbital and suborbital missions, including those in LEO, GEO, HEO, lunar and L1/L2 orbits. The NENs future mission set includes and will continue to include CubeSat missions. The majority of the CubeSat missions destined to fly on EM-1, launching in late 2018, many in a lunar orbit, will communicate with ground based stations via X-band and will utilize the NASA Jet Propulsion Laboratory (JPL) developed IRIS radio. The NEN recognizes the important role CubeSats are beginning to play in carrying out NASAs mission and is therefore investigating the modifications needed to provide IRIS radio compatibility. With modification, the NEN could potentially expand support to the EM-1 lunar CubeSats.The NEN could begin providing significant coverage to lunar CubeSat missions utilizing three to four of the NENs mid-latitude sites. This coverage would supplement coverage provided by the JPL Deep Space Network (DSN). The NEN, with smaller apertures than DSN, provides the benefit of a larger beamwidth that could be beneficial in the event of uncertain ephemeris data. In order to realize these benefits the NEN would need to upgrade stations targeted based on coverage ability and current configuration/ease of upgrade, to ensure compatibility with the IRIS radio. In addition, the NEN is working with CubeSat radio developers to ensure NEN compatibility with alternative CubeSat radios for Lunar and L1/L2 CubeSats. The NEN has provided NEN compatibility requirements to several radio developers who are developing radios that offer lower cost and, in some cases, more capabilities with fewer constraints. The NEN is ready to begin supporting CubeSat missions. The NEN is considering network upgrades to broaden the types of CubeSat missions that can be supported and is supporting both the CubeSat community and radio developers to ensure future CubeSat missions have multiple options when choosing a network for their communications support.

  17. Cabana Multi-User Spaceport Tour of KSC

    NASA Image and Video Library

    2017-02-17

    Members of the news media view the 10 levels of new work platforms in High Bay 3 inside the Vehicle Assembly Building (VAB) during a tour of NASA's Kennedy Space Center in Florida with Center Director Bob Cabana. The final platform, A north, was recently installed. The platforms will surround the Space Launch System and Orion spacecraft on the mobile launcher during processing to prepare for the first test flight. The Ground Systems Development and Operations Program is overseeing upgrades to the VAB, including installation of the new work platforms.

  18. U. S. GEOLOGICAL SURVEY'S NATIONAL REAL-TIME HYDROLOGIC INFORMATION SYSTEM USING GOES SATELLITE TECHNOLOGY.

    USGS Publications Warehouse

    Shope, William G.

    1987-01-01

    The U. S. Geological Survey maintains the basic hydrologic data collection system for the United States. The Survey is upgrading the collection system with electronic communications technologies that acquire, telemeter, process, and disseminate hydrologic data in near real-time. These technologies include satellite communications via the Geostationary Operational Environmental Satellite, Data Collection Platforms in operation at over 1400 Survey gaging stations, Direct-Readout Ground Stations at nine Survey District Offices and a network of powerful minicomputers that allows data to be processed and disseminate quickly.

  19. A Scientific Revolution: the Hubble and James Webb Space Telescopes

    NASA Technical Reports Server (NTRS)

    Gardner, Jonathan P.

    2011-01-01

    Astronomy is going through a scientific revolution, responding to a flood of data from the Hubble Space Telescope, other space missions, and large telescopes on the ground. In this talk, I will discuss some of the most important astronomical discoveries of the last 10 years, and the role that space telescopes have played in those discoveries. The next decade looks equally bright with the newly refurbished Hubble and the promise of its successor, the James Webb Space Telescope. I will describe how Hubble was upgraded and how and why we are building Webb.

  20. A Scientific Revolution: The Hubble and James Webb Space Telescopes

    NASA Technical Reports Server (NTRS)

    Gardner, Jonathan

    2011-01-01

    Astronomy is going through a scientific revolution, responding to a flood of data from the Hubble Space Telescope, other space missions, and large telescopes on the ground. In this talk, I will discuss some of the most important astronomical discoveries of the last 10 years, and the role that space telescopes have played in those discoveries. The next decade looks equally bright with the newly refurbished Hubble and the promise of its successor, the James Webb Space Telescope. I will describe how Hubble was upgraded and how and why we are building Webb.

  1. A Scientific Revolution: The Hubble and James Webb Space Telescopes

    NASA Technical Reports Server (NTRS)

    Gardner, Jonathan P.

    2009-01-01

    Astronomy is going through a scientific revolution, responding to a flood of data from the Hubble Space Telescope, other space missions, and large telescopes on the ground. In this talk, I will discuss the top 10 astronomical discoveries of the last 10 years, and the role that space telescopes have played in those discoveries. The next decade looks equally bright with the newly refurbished Hubble and the promise of its successor, the James Webb Space Telescope. I will describe how Hubble was upgraded and how and why we are building Webb.

  2. A Scientific Revolution: the Hubble and James Webb Space Telescopes

    NASA Technical Reports Server (NTRS)

    Gardner, Jonathan P.

    2012-01-01

    Astronomy is going through a scientific revolution, responding to a flood of data from the Hubble Space Telescope, other space missions, and large telescopes on the ground. In this talk, I will discuss some of the most important astronomical discoveries of the last IO years, and the role that space telescopes have played in those discoveries. The next decade looks equally bright with the newly refurbished Hubble and the promise of its successor, the James Webb Space Telescope. I will describe how Hubble was upgraded and how and why we are building Webb.

  3. Advanced technologies for future ground-based, laser-interferometric gravitational wave detectors

    PubMed Central

    Hammond, Giles; Hild, Stefan; Pitkin, Matthew

    2014-01-01

    We present a review of modern optical techniques being used and developed for the field of gravitational wave detection. We describe the current state-of-the-art of gravitational waves detector technologies with regard to optical layouts, suspensions and test masses. We discuss the dominant sources and noise in each of these subsystems and the developments that will help mitigate them for future generations of detectors. We very briefly summarise some of the novel astrophysics that will be possible with these upgraded detectors. PMID:25705087

  4. Successful MPPF Pneumatics Verification and Validation Testing

    NASA Image and Video Library

    2017-03-28

    Engineers and technicians completed verification and validation testing of several pneumatic systems inside and outside the Multi-Payload Processing Facility (MPPF) at NASA's Kennedy Space Center in Florida. In view is the service platform for Orion spacecraft processing. The MPPF will be used for offline processing and fueling of the Orion spacecraft and service module stack before launch. Orion also will be de-serviced in the MPPF after a mission. The Ground Systems Development and Operations Program (GSDO) is overseeing upgrades to the facility. The Engineering Directorate led the recent pneumatic tests.

  5. Successful MPPF Pneumatics Verification and Validation Testing

    NASA Image and Video Library

    2017-03-28

    Engineers and technicians completed verification and validation testing of several pneumatic systems inside and outside the Multi-Payload Processing Facility (MPPF) at NASA's Kennedy Space Center in Florida. In view is the top level of the service platform for Orion spacecraft processing. The MPPF will be used for offline processing and fueling of the Orion spacecraft and service module stack before launch. Orion also will be de-serviced in the MPPF after a mission. The Ground Systems Development and Operations Program (GSDO) is overseeing upgrades to the facility. The Engineering Directorate led the recent pneumatic tests.

  6. Changes of pelvis control with subacute stroke: A comparison of body-weight- support treadmill training coupled virtual reality system and over-ground training.

    PubMed

    Mao, Yurong; Chen, Peiming; Li, Lifang; Li, Le; Huang, Dongfeng

    2015-01-01

    Gait recovery is very important to stroke survivors to regain their independence in activity of daily life. This study aimed to investigate the effects of virtual reality (VR) coupled body weight support treadmill training (BWSTT) on pelvic control at the early stage of stroke. Kinematic and kinetic changes of pelvic motion were evaluated by a 3D gait analysis system and were compared to the results from over-ground walking training. Twenty-four patients having unilateral hemiplegia with subacute stroke were recruited to a VR coupled BWSTT group (n= 12) and a conventional therapy (CT) group (n= 12). Both of the groups received training of 20-40 min/day, 5 days/week, for 3 weeks. The results showed the tilt of pelvis in sagittal plane improved significantly (P= 0.038) after treatment in the BWSTT+VR group, in terms of decreased amplitude of anterior peak (mean, from 10.99° to 6.25°), while there were no significant differences in the control group. The findings suggested that VR coupled BWSTT gait training could decrease anterior tilt of pelvis in early hemiparetic persons following a modest intervention dose, and the training may have advantages over conventional over-ground gait training and can assist the therapists in correcting abnormal gait pattern of stroke survivors.

  7. A hybrid modelling approach for predicting ground vibration from trains

    NASA Astrophysics Data System (ADS)

    Triepaischajonsak, N.; Thompson, D. J.

    2015-01-01

    The prediction of ground vibration from trains presents a number of difficulties. The ground is effectively an infinite medium, often with a layered structure and with properties that may vary greatly from one location to another. The vibration from a passing train forms a transient event, which limits the usefulness of steady-state frequency domain models. Moreover, there is often a need to consider vehicle/track interaction in more detail than is commonly used in frequency domain models, such as the 2.5D approach, while maintaining the computational efficiency of the latter. However, full time-domain approaches involve large computation times, particularly where three-dimensional ground models are required. Here, a hybrid modelling approach is introduced. The vehicle/track interaction is calculated in the time domain in order to be able t account directly for effects such as the discrete sleeper spacing. Forces acting on the ground are extracted from this first model and used in a second model to predict the ground response at arbitrary locations. In the present case the second model is a layered ground model operating in the frequency domain. Validation of the approach is provided by comparison with an existing frequency domain model. The hybrid model is then used to study the sleeper-passing effect, which is shown to be less significant than excitation due to track unevenness in all the cases considered.

  8. Development of Broadband Telecommunication System for Railways using Laser Technology

    NASA Astrophysics Data System (ADS)

    Nakamura, Kazuki; Nakagawa, Shingo; Matsubara, Hiroshi; Tatsui, Daisuke; Seki, Kiyotaka; Haruyama, Shinichiro; Teraoka, Fumio

    We developed a high-speed telecommunication system applicable to railways, to improve customer service and efficiency of operator's telecommunication between the ground facilities and trains under operations. We manufactured a mobile telecommunication system, capable of recording the transfer rate of 1Gbps in theory by applying the laser beam communication technology. We carried out a field test using trains in active service, and obtained the result of the transfer rate of approximately 700Mbps on the TCP layer between the ground and the train running at a speed of approximately 130km/h.

  9. Effect of a general aviation trainer on the stress of flight training.

    PubMed

    Melton, C E; McKenzie, J M; Kellin, J R; Hoffmann, S M; Saldivar, J T

    1975-01-01

    Sixteen students were given flight training according to a highly standardized and rigidly controlled 35-h syllabus. Eight of the group (TG) recieved 10 h of their training in a Link GAT-1 ground trainer and 25 h in a Cherokee 140B. the other eight (AG) recieved all of their training in the airplane. The resting heart rate (HR) of group TG was significantly lower when the ground trainer was to be used than was the resting HR of group AG on equivalent lessons. The difference disappeared when group TG was to fly the airpland. In flight, group AG'S HR was significantly higher than group TG's in the ground trainer. Again the difference disappeared when group TG flew the airpland. Physcial work, as indicated by O2 consumption, was greater in the airplane than in the ground trainer. Urine chemistry indicated only a few and inconsistent points of significant differece between the groups. However, pre- and post-flight differences showed highly significant differences for both TG and AG. Objective flight tests administered four times during the syllabus indicated insignigicant differences between TG and AG, likewise, a check pilot who did not know to which group a student belonged could not differentiate between groups TG and AG. It was concluded that 10 h training in the GAT-1 did not compromise the flying skill as judged by the check pilot.

  10. Cockpit Resource Management (CRM): A tool for improved flight safety (United Airlines CRM training)

    NASA Technical Reports Server (NTRS)

    Carroll, J. E.; Taggart, William R.

    1987-01-01

    The approach and methodology used in developing cockpit management skills is effective because of the following features: (1) A comparative method of learning is used enabling crewmembers to study different forms of teamwork. (2) The learning comes about as a result of crewmembers learning from one another instead of from an expert instructor. (3) Key elements of cockpit teamwork and effective management are studied so that crewmembers can determine how these elements can improve safety and problem solving. (4) Critique among the crewmembers themselves rather than from outsiders is used as a common focusing point for crews to provide feedback to one another on how each can be a more effective crewmember. (5) The training is continuous in the sense that it becomes part of recurrent, upgrade, and other forms of crewmember training and development. And (6) the training results in sound and genuine insights that come about through solid education as opposed to tutoring, coaching, or telling crewmembers how to behave more effectively.

  11. A model for capacity-building in AIDS prevention programs.

    PubMed

    Ramos, Rebeca L; Ferreira-Pinto, João B

    2002-06-01

    This article discusses a collaboratively organizational capacity-building model for agencies engaged in HIV/AIDS prevention. The cooperative training approach (CTA) utilized by the Training and Technical Assistance Program trained participants to incorporate learned skills into their daily work practices, and to become trainers to help disseminate their newly acquired skills, first to others in their own organization and later to other organizations. The CTA was successfully implemented among 285 community-based organizations (CBOs) serving predominantly Hispanics in the U.S.-Mexico border region. The program evaluation demonstrated that it has significantly upgraded the program implementation capability and the organizational infrastructure of the participating organizations resulting in improved delivery of services to their clients. Furthermore, it fostered networking and collaboration for the development of sustainable training and technical assistance networks of agency staff skilled in organizational capacity building. It is suggested that funding agencies examine the feasibility of using this approach to increase the organizational capacity of CBOs involved in HIV/AIDS prevention.

  12. Contemporary social network sites: Relevance in anesthesiology teaching, training, and research

    PubMed Central

    Haldar, Rudrashish; Kaushal, Ashutosh; Samanta, Sukhen; Ambesh, Paurush; Srivastava, Shashi; Singh, Prabhat K.

    2016-01-01

    Objective: The phenomenal popularity of social networking sites has been used globally by medical professionals to boost professional associations and scientific developments. They have tremendous potential to forge professional liaisons, generate employment,upgrading skills and publicizing scientific achievements. We highlight the role of social networking mediums in influencing teaching, training and research in anaesthesiology. Background: The growth of social networking sites have been prompted by the limitations of previous facilities in terms of ease of data and interface sharing and the amalgamation of audio visual aids on common platforms in the newer facilities. Review: Contemporary social networking sites like Facebook, Twitter, Tumblr,Linkedn etc and their respective features based on anaesthesiology training or practice have been discussed. A host of advantages which these sites confer are also discussed. Likewise the potential pitfalls and drawbacks of these facilities have also been addressed. Conclusion: Social networking sites have immense potential for development of training and research in Anaesthesiology. However responsible and cautious utilization is advocated. PMID:27625491

  13. Contemporary social network sites: Relevance in anesthesiology teaching, training, and research.

    PubMed

    Haldar, Rudrashish; Kaushal, Ashutosh; Samanta, Sukhen; Ambesh, Paurush; Srivastava, Shashi; Singh, Prabhat K

    2016-01-01

    The phenomenal popularity of social networking sites has been used globally by medical professionals to boost professional associations and scientific developments. They have tremendous potential to forge professional liaisons, generate employment,upgrading skills and publicizing scientific achievements. We highlight the role of social networking mediums in influencing teaching, training and research in anaesthesiology. The growth of social networking sites have been prompted by the limitations of previous facilities in terms of ease of data and interface sharing and the amalgamation of audio visual aids on common platforms in the newer facilities. Contemporary social networking sites like Facebook, Twitter, Tumblr,Linkedn etc and their respective features based on anaesthesiology training or practice have been discussed. A host of advantages which these sites confer are also discussed. Likewise the potential pitfalls and drawbacks of these facilities have also been addressed. Social networking sites have immense potential for development of training and research in Anaesthesiology. However responsible and cautious utilization is advocated.

  14. 14 CFR 61.89 - General limitations.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ...-sport aircraft without having received the applicable ground training, flight training, and instructor... a business; (5) On an international flight, except that a student pilot may make solo training... flight is conducted, except when receiving flight training from an authorized instructor on board an...

  15. STS-109 Onboard Photo of Extra-Vehicular Activity (EVA)

    NASA Technical Reports Server (NTRS)

    2002-01-01

    This is an onboard photo of the Hubble Space Telescope (HST) power control unit (PCU), the heart of the HST's power system. STS-109 payload commander John M. Grunsfeld, joined by Astronaut Richard M. Lirnehan, turned off the telescope in order to replace its PCU while participating in the third of five spacewalks dedicated to servicing and upgrading the HST. Other upgrades performed were: replacement of the solar array panels; replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near-Infrared Camera and Multi-Object Spectrometer (NICMOS), which had been dormant since January 1999 when its original coolant ran out. The telescope was captured and secured on a work stand in Columbia's payload bay using Columbia's robotic arm, where crew members completed the system upgrades. The Marshall Space Flight Center had the responsibility for the design, development, and construction of the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit. The HST detects objects 25 times fainter than the dimmest objects seen from Earth and provides astronomers with an observable universe 250 times larger than is visible from ground-based telescopes, perhaps as far away as 14 billion light-years. Launched March 1, 2002 the STS-109 HST servicing mission lasted 10 days, 22 hours, and 11 minutes. It was the 108th flight overall in NASA's Space Shuttle Program.

  16. Space Shuttle Projects

    NASA Image and Video Library

    2002-03-01

    This is an onboard photo of the Hubble Space Telescope (HST) power control unit (PCU), the heart of the HST's power system. STS-109 payload commander John M. Grunsfeld, joined by Astronaut Richard M. Lirnehan, turned off the telescope in order to replace its PCU while participating in the third of five spacewalks dedicated to servicing and upgrading the HST. Other upgrades performed were: replacement of the solar array panels; replacement of the Faint Object Camera (FOC) with a new advanced camera for Surveys (ACS); and installation of the experimental cooling system for the Hubble's Near-Infrared Camera and Multi-Object Spectrometer (NICMOS), which had been dormant since January 1999 when its original coolant ran out. The telescope was captured and secured on a work stand in Columbia's payload bay using Columbia's robotic arm, where crew members completed the system upgrades. The Marshall Space Flight Center had the responsibility for the design, development, and construction of the HST, which is the most complex and sensitive optical telescope ever made, to study the cosmos from a low-Earth orbit. The HST detects objects 25 times fainter than the dimmest objects seen from Earth and provides astronomers with an observable universe 250 times larger than is visible from ground-based telescopes, perhaps as far away as 14 billion light-years. Launched March 1, 2002 the STS-109 HST servicing mission lasted 10 days, 22 hours, and 11 minutes. It was the 108th flight overall in NASA's Space Shuttle Program.

  17. Robonaut 2 on the International Space Station: Status Update and Preparations for IVA Mobility

    NASA Technical Reports Server (NTRS)

    Ahlstrom, Thomas D.; Diftler, Myron E.; Berka, Reginald B.; Badger, Julia M.; Yayathi, Sandeep; Curtis, Andrew W.; Joyce, Charles A.

    2013-01-01

    Robotics engineers, ground controllers and International Space Station (ISS) crew have been running successful experiments using Robonaut 2 (R2) on-board the ISS for more than a year. This humanoid upper body robot continues to expand its list of achievements and its capabilities to safely demonstrate maintenance and servicing tasks while working alongside human crewmembers. The next phase of the ISS R2 project will transition from a stationary Intra Vehicular Activity (IVA) upper body using a power/data umbilical, to an IVA mobile system with legs for repositioning, a battery backpack power supply, and wireless communications. These upgrades will enable the R2 team to evaluate hardware performance and to develop additional control algorithms and control verification techniques with R2 inside the ISS in preparation for the Extra Vehicular Activity (EVA) phase of R2 operations. As R2 becomes more capable in assisting with maintenance tasks, with minimal supervision, including repositioning itself to different work sites, the ISS crew will be burdened with fewer maintenance chores, leaving them more time to conduct other activities. R2's developers at the Johnson Space Center (JSC) are preparing the R2 IVA mobility hardware and software upgrades for delivery to the ISS in late 2013. This paper summarizes R2 ISS achievements to date, briefly describes the R2 IVA mobility upgrades, and discusses the R2 IVA mobility objectives and plans.

  18. Management and Supervision Procedures for Wastewater Facilities, Wastewater Technology: A Two-Year Post High School Instructional Program. An Instructor's Guide for Use of Instructional Material in Wastewater Technology Training Programs. Volume IV.

    ERIC Educational Resources Information Center

    Mason, George J.; And Others

    This document is one in a series which outlines performance objectives and instructional modules for a course of study in the management of wastewater treatment plants. The modules are arranged in an order appropriate for teaching students with no experience. The modules can also be rearranged and adapted for courses to upgrade personnel moving…

  19. The State of American Jobs: How the Shifting Economic Landscape Is Reshaping Work and Society and Affecting the Way People Think about the Skills and Training They Need to Get Ahead

    ERIC Educational Resources Information Center

    Pew Research Center, 2016

    2016-01-01

    Tectonic changes are reshaping U.S. workplaces as the economy moves deeper into the knowledge-focused age. These changes are affecting the very nature of jobs by rewarding social, communications and analytical skills. They are prodding many workers to think about lifetime commitments to retraining and upgrading their skills. And they may be…

  20. Research Plan of the Department of Systems Engineering and the Operations Research Center for Academic Year 2007

    DTIC Science & Technology

    2006-10-01

    high probability for success. Estimated Time to Complete: 31 May 2007. 4. Support and Upgrade of Armed Forces-CARES to integrate Chaplin ...Excellence (ORCEN) is to provide a small, full- time analytical capability to both the Academy and the United States Army and the Department of...complete significant research projects in this time as they usually require little train-up as they are exposed to many military and academic

Top