Sample records for upshot project

  1. Operation UPSHOT-KNOTHOLE. Operational Summary, Nevada Proving Grounds, 1 March - 9 June 1953

    DTIC Science & Technology

    1982-08-01

    EXTRACTED VERSION OPERATION UPSHOT-KNOTHOLE -- Operational Summary Nevada Proving Grounds ,* 1 March-9 June 1953 Headquarters Field Command Armed...Weapons Effects Tests 9. PERIORUMING 004CAWIZAY10ON AME ANO AOO1RESS 10. P140GRAM ELEMENPT, PROJECT, TASK AREA a 1114.01110 UNIT NUMBERS Headquarters Field ...process of preparation. Activities in prepara- tion for the operational period have been previously recorded in Field Commnand Histo y DO I "’* 1473

  2. NORMAL HUMAN VARIATION: REFOCUSSING THE ENHANCEMENT DEBATE

    PubMed Central

    Kahane, Guy; Savulescu, Julian

    2015-01-01

    This article draws attention to several common mistakes in thinking about biomedical enhancement, mistakes that are made even by some supporters of enhancement. We illustrate these mistakes by examining objections that John Harris has recently raised against the use of pharmacological interventions to directly modulate moral decision-making. We then apply these lessons to other influential figures in the debate about enhancement. One upshot of our argument is that many considerations presented as powerful objections to enhancement are really strong considerations in favour of biomedical enhancement, just in a different direction. Another upshot is that it is unfortunate that much of the current debate focuses on interventions that will radically transform normal human capacities. Such interventions are unlikely to be available in the near future, and may not even be feasible. But our argument shows that the enhancement project can still have a radical impact on human life even if biomedical enhancement operated entirely within the normal human range. PMID:23906367

  3. Shot BADGER, a test of the UPSHOT-KNOTHOLE Series, 18 April 1953. Technical report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Massie, J.; Maag, C.; Rohrer, S.

    1982-01-12

    This report describes the activities of DOD personnel in Shot BADGER, the sixth nuclear test in the UPSHOT-KNOTHOLE atmospheric nuclear weapons testing series. The test, conducted on 18 April 1953, involved military personnel in Exercise Desert Rock V, AFSWP, AFSWC, and AEC test activities. The largest activity was the 2d Marine Corps Provisional Atomic Exercise Brigade maneuver involving 2,167 Marines.

  4. Operation Upshot-Knothole, Nevada Proving Grounds, March-June 1953. Project 8.5. Thermal Radiation Protection Afforded Test Animals by Fabric Assemblies

    DTIC Science & Technology

    1955-07-01

    material. More recently its efforts have been concentrated on the development of an inanimate backing material that will simulate the time-temperature...the front and to the side of thc animals photographed. The motion photography for the 4500 ft. station was obtained by moving a total of six test... concentrated in areas adjacent to that covered by the drawstring. An example of such a burn is shown in Fig. 3.1. Seventeen pigs which were burned did

  5. Electromagnetic Measurements Conducted by the Central Radio Propagation Laboratory During Operation Upshot-Knothole (Redacted)

    DTIC Science & Technology

    1954-03-31

    b . ABSTRACT c. THIS PAGE 19b. TELEPHONE NUMBER (include area code) Standard Form 298 (Re . 8-98) v Prescribed by ANSI Std. Z39.18 31...March 1954 Final report Electromagnetic Measurements Conducted by the Central Radio Propagation Laboratory During Operation Upshot-Knothole B /216/E...Vubington 25, D. C. COD fw 5 U.S.C. § 552 ( b )( 6) O££ice (or AtOIIIie Fnergy, DCS/0 r r T l A . O!tp1rtment o£ the 1\\ir force \\ ·-’ . If

  6. Operation Upshot-Knothole, Nevada Proving Ground, March-June 1953. Projects 23.4-23.14 and 23.16. Genetic Effects of Fast Neutrons from Nuclear Detonations,

    DTIC Science & Technology

    1954-01-01

    THIS SHEET AND RETURN TO DTIC-DDA-2 FORM DOCUMENT PROCESSING SHEET DTIC oct79 70A OCT. 79 11 0 0 0 r/ WT-820 This document consists of 86 Pages No...mutation curve with no lower limit.2 In addition, there is a dose-related recovery process for physiological effects of lrradaticn by chronic or repeated...individual formed by reproductive processes may be expected to show in all its cells whatever genetic effects the ionizations have produced. 9,1w The

  7. Operation UPSHOT-KNOTHOLE, Nevada Proving Grounds, March-June 1953. Project 6.12. Determination of Height of Burst and Ground Zero

    DTIC Science & Technology

    1955-05-01

    6.2.1 Seismic Height of Burst Determination 6l 6.2.2 Long Range Yield Determination 6l 6.2.3 Lead Sulphide Cells 6l | • APPENDIX A SURVEY...located at M 96 in the vicinity of Array 3* The original metro station was moved to vicinity Camp Mercury Sewage Disposal Plant for Shots 9 and 10. The...JWiRE COMMUNICATION =r=^^l .QBAWIELS ., I foi* 50—ftfejP - -70 CAMP DESERT MICROPHONE 40- 15" (CAMP --’ MERCURY -60 MICROPHONE ARRAY NO I

  8. Operation UPSHOT-KNOTHOLE, Nevada Proving Grounds, March-June 1953. Project 3.5 Tests on the Response of Wall and Roof Panels and the Transmission of Load to Supporting Structure

    DTIC Science & Technology

    1955-05-01

    56 4.23 Postshot, 3.5ba, Interior of Test Cell . . . . . . . . • • 57 4.24 Postshot, 35.Sbb, Damage to Precast Concrete Channel Roof 6...Predicted Applied and Measured Transmitted Forces, Roof Panel 3.5bb (3-1/2 in. precast concrete channels on steel purlins) . . . o . o . ... . ... 104 5.16...truss rafters 3.Sba Bowstring truss with wood 4500 4200 10 7.1 10 decking, tar and gravel roofing 3.5bb 3-1/2 in. precast concrete channels on steel

  9. Operation Upshot-Knothole. Project 1.1d Dynamic Pressure versus Time and Supporting Air Blast Measurements

    DTIC Science & Technology

    1954-02-01

    the Ranklne-iru^onlot relation and Sq 1.1 would be a good approxi* nation when applied to the peak valuea even though the ahock had a rounded...inatance ia q - i P • (u* ain a1 ♦ u iln a)<^ (1.2) When we insert into thla equation the reiatlona for the dependence of denalty and velocity on the...two ahock atren^tha, K^-^/^S^ ̂T ain a * ^ * 1 - aln a* SW’ ♦ 6) h (1.3) ( aa defined here and uaed ^ Bq i.J ia that uaed by Polachek and

  10. Analysis of operation UPSHOT-KNOTHOLE nuclear test BADGER radiological and meteorological data

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Quinn, V.E.

    1986-04-01

    This report describes the Weather Service Nuclear Support Office (WSNSO) analyses of the radiological and meteorological data collected for the BADGER nuclear test of Operation UPSHOT-KNOTHOLE. Inconsistencies in the radiological data and their resolution are discussed. The methods of normalizing the radiological data to a standard time, of converting the aerial data to equivalent ground-level values, and of estimating fallout-arrival times are presented. The meteorological situations on event day and the following day are described. A comparison of the WSNSO fallout analysis with an analysis performed during the 1950's is presented. The radiological data used to derive the WSNSO falloutmore » pattern are tabulated in an appendix.« less

  11. Operation UPSHOT-KNOTHOLE, Nevada Proving Grounds, March-June 1953. Project 9.1, Technical Photography

    DTIC Science & Technology

    1954-01-01

    per cent. 3.2 MECHANICAL In order to get above the Gust raised by t.he bleats it vas de - cided to place all cameras on to’lIe"~. A guyed monopole...C8mOra lIIOlmts tor the variDm’ t:JP88 ot c~ras were de - signed t’O tit on the platfona on t.op of tl:ie to_I". .A di.-tic sketch of a 6 tt c8118ra...large number ot c_eru. !n order to worlc on tm higber towel𔄂 efficient17, apec:l.l.l. eqll1~nta were des ~oQ and bdU or proClU’Gd coJlllll8rclal.l7

  12. Neuroscience and Ethics.

    PubMed

    Liao, S Matthew

    2017-03-01

    A number of people believe that results from neuroscience have the potential to settle seemingly intractable debates concerning the nature, practice, and reliability of moral judgments. In particular, Joshua Greene has argued that evidence from neuroscience can be used to advance the long-standing debate between consequentialism and deontology. This paper first argues that charitably interpreted, Greene's neuroscientific evidence can contribute to substantive ethical discussions by being part of an epistemic debunking argument. It then argues that taken as an epistemic debunking argument, Greene's argument falls short in undermining deontological judgments. Lastly, it proposes that accepting Greene's methodology at face value, neuroimaging results may in fact call into question the reliability of consequentialist judgments. The upshot is that Greene's empirical results do not undermine deontology and that Greene's project points toward a way by which empirical evidence such as neuroscientific evidence can play a role in normative debates.

  13. Conceptual Development of Einstein's Mass-Energy Relationship

    ERIC Educational Resources Information Center

    Wong, Chee Leong; Yap, Kueh Chin

    2005-01-01

    Einstein's special theory of relativity was published in 1905. It stands as one of the greatest intellectual achievements in the history of human thought. Einstein described the equivalence of mass and energy as "the most important upshot of the special theory of relativity" (Einstein, 1919). In this paper, we will discuss the evolution of the…

  14. Analysis of Radiation Exposure for Troop Observers, Exercise Desert Rock V, Operation Upshot-Knothole.

    DTIC Science & Technology

    1981-04-28

    on initial doses. Residual doses are determined through an automiated procedure that utilizes raw data in regression analyses to fit space-time models...show their relationship to the observer positions. The computer-calculated doses do not reflect the presence of the human body in the radiological

  15. Comparison of field and laboratory forest fuel ignition energies and extrapolation to high-yield weapons

    Treesearch

    F.M. Sauer

    1956-01-01

    Comparisons are made between Ignition energies of forest fuels, including newspaper, determined during Operations BUSTER, SNAPPER and UPSHOT-KNOTHOLE and laboratory exposures made utilizing the Forest Service thermal source. Agreement is excellent for fuels exposed normal to the radiant flux when fuel moisture content is considered. Ignition of fuels exposed at...

  16. Operation UPSHOT-KNOTHOLE, 1953

    DTIC Science & Technology

    1982-01-11

    nature of a single atomic blast. The explosion yesterday morning could not by itself have performed miracles" (208). Committee members indicated that...assess the degree of ENCORE GRABLE Forest Service Coniferous Tree Stands damage to material and by Atomic Explosions personnel and the amount of cover...military bridging 3.24 Effects of an Airbust To determine the degree ENCORE, GRABLE Naval Radiological Defense Atomic Explosion on of blast damage landing

  17. Pressure distribution with surface roughness for effect between porous infinitely long rectangular plates with MHD couple stress squeeze film lubrication

    NASA Astrophysics Data System (ADS)

    Sangeetha, S.; Kesavan, Sundarammal

    2018-04-01

    This investigation is an analysis of MHD couple stress squeeze film performance with a rough surface between porous infinitely long rectangular plates. The pressure equation for the magnetic field is mathematically derived using Christensen’s stochastic equation. Therefore, the upshot of this magnetic effect reveals the enhanced performance of the pressure which is compared to the Newtonian instance.

  18. [Surrogacy, yes or no? Case report].

    PubMed

    Pektorová, M; Ventruba, P

    2015-08-01

    Case study of surrogacy which did not come up to client-couple´s expectation. Case report. Department of Gynaecology and Obstetrics, Uherske Hradiste Hospital a. s., Uherske Hradiste. Description of the case, case study. In the Czech Republic, missing legislation when subject matter is surrogacy does not allow to make a complex legal contract. This fact causes legal uncertainty to all participants. Irresponsible approach of doctors, surrogate mother, client-couple, and in the upshot care of disabled child at government expense can be results.

  19. Radically questioning the principle of the least restrictive alternative: a reply to Nir Eyal

    PubMed Central

    Saghai, Yashar

    2014-01-01

    In his insightful editorial, Nir Eyal explores the connections between nudging and shaming. One upshot of his argument is that we should question the principle of the least restrictive alternative in public health and health policy. In this commentary, I maintain that Eyal’s argument undermines only a rather implausible version of the principle of the least restrictive alternative and I sketch two reasons for rejecting the mainstream and more plausible version of this principle. PMID:25396212

  20. Transient Boundary Layer Disturbance Growth and Bypass Transition Due to Realistic Roughness and Continued Study of Transition Over Riblets

    DTIC Science & Technology

    2011-03-19

    producing negative streamwise vorticity). It is not clear, however, why these ωx pancakes take on this alternating layer form. Figuring out how new...streamwise vorticity. The stream ribbons are colored by the vorticity component along the direction of the ribbon. The upshot of such an image is...different colors . The right image of figure 21 is created from analyzing several photographs of each single collar vortex. Due to limitations in the dye

  1. Operation UPSHOT-KNOTHOLE. Report to the Test Director Aircraft Participation, Nevada Proving Grounds, March-June 1953

    DTIC Science & Technology

    1982-06-04

    Alamos Scientific Laboratory. It was calibrated before each mission and was the primary instrument for de - termining breakaway time. In order to check...wing (leading edge) 30 IS Right pylon rack Right wing tip 9 Right wing tip tank 750 50 7 Right side turbina 150 150 IS Right horizontal stabilizer...hr; however, it was planned to make two penetrations at less than H + 2 hr, probably H + 1 hr 30 min and 1 hr 45 min, de - pending on cloud

  2. Survey shows continued strong interest in UNIX applications for healthcare.

    PubMed

    Dunbar, C

    1993-03-01

    As part of the general computer industry movement toward open systems, many are predicting UNIX will become the dominant host operating system of the late 1990s. To better understand this prediction within the healthcare setting, Computers in Healthcare surveyed our readership about their opinions of UNIX, its current use and its relative importance as an information services strategy. The upshot? CIH readers definitely want more systems on UNIX, more healthcare applications written for UNIX and more trained resource people to help them with faster installation and more useful applications.

  3. Radically questioning the principle of the least restrictive alternative: a reply to Nir Eyal: Comment on "Nudging by Shaming, Shaming by Nudging".

    PubMed

    Saghai, Yashar

    2014-11-01

    In his insightful editorial, Nir Eyal explores the connections between nudging and shaming. One upshot of his argument is that we should question the principle of the least restrictive alternative in public health and health policy. In this commentary, I maintain that Eyal's argument undermines only a rather implausible version of the principle of the least restrictive alternative and I sketch two reasons for rejecting the mainstream and more plausible version of this principle.

  4. The role of non-epistemic values in engineering models.

    PubMed

    Diekmann, Sven; Peterson, Martin

    2013-03-01

    We argue that non-epistemic values, including moral ones, play an important role in the construction and choice of models in science and engineering. Our main claim is that non-epistemic values are not only "secondary values" that become important just in case epistemic values leave some issues open. Our point is, on the contrary, that non-epistemic values are as important as epistemic ones when engineers seek to develop the best model of a process or problem. The upshot is that models are neither value-free, nor depend exclusively on epistemic values or use non-epistemic values as tie-breakers.

  5. A finite world, earth sciences, and public trust.

    PubMed

    Narasimhan, T N

    2003-01-01

    The beginning of the 21st century has coincided with our recognition that life-sustaining earth cycles are remarkably fine-tuned, and that humans have developed technological abilities to perturb these cycles. Also, inspired bythe gifts of freedom and democracy, humans have given themselves laws to exploit nature for profit. The upshot is that nature's balance, governed by immutable physical laws, is being confronted by social laws driven by human aspirations. This conflict and its implications to the human relevance of the earth sciences are explored in the context of an extraordinary tradition of European culture known as public trust.

  6. Operation UPSHOT-KNOTHOLE, Radiological Safety Operations

    DTIC Science & Technology

    1953-06-01

    used for cloud tracking, one C-47 and b L-20’ s used for the low level terrain survey, and two helicopters to be used for on-site sui e^ All the... using the following form: MESSAGE FORM TERRAIN SURVEY (C47, L20’ s ) (Rag Mop) 1. Call Sign (Ever Ready) 2. Message No. RS 3. Position (Grid) 4...jS iS 0 0 oo » 5z; S5 * * w oo .2 « C C «) fl) 4-i s oo « E S 3 » o o B K o xi ä o o £ ca co ^ c4 co m us a» o CM

  7. What Do Nectaris Basin Impact Melt Rocks Look like and Where Can We Find Them?

    NASA Technical Reports Server (NTRS)

    Cohen, B. A.; Petro, N. E.; Lawrence, S. J.

    2015-01-01

    The formation of the Nectaris basin is a key event defining the stratigraphy of the Moon. Its absolute age, therefore, is a linchpin for lunar bombardment history. Fernandes et al. gave a thorough account of the history of different samples thought to originate in Nectaris, with the upshot being there is little agreement on what samples represent Nectaris, if any. We are revisiting the effort to identify Nectaris basin impact-melt rocks at the Apollo 16 site, to model their emplacement, and to use these parameters to examine other sites where Nectaris impact melt is more abundant and/or more recognizable for potential further study.

  8. Why is a computational framework for motivational and metacognitive control needed?

    NASA Astrophysics Data System (ADS)

    Sun, Ron

    2018-01-01

    This paper discusses, in the context of computational modelling and simulation of cognition, the relevance of deeper structures in the control of behaviour. Such deeper structures include motivational control of behaviour, which provides underlying causes for actions, and also metacognitive control, which provides higher-order processes for monitoring and regulation. It is argued that such deeper structures are important and thus cannot be ignored in computational cognitive architectures. A general framework based on the Clarion cognitive architecture is outlined that emphasises the interaction amongst action selection, motivation, and metacognition. The upshot is that it is necessary to incorporate all essential processes; short of that, the understanding of cognition can only be incomplete.

  9. Evaluation of parameters for particles acceleration by the zero-point field of quantum electrodynamics

    NASA Technical Reports Server (NTRS)

    Rueda, A.

    1985-01-01

    That particles may be accelerated by vacuum effects in quantum field theory has been repeatedly proposed in the last few years. A natural upshot of this is a mechanism for cosmic rays (CR) primaries acceleration. A mechanism for acceleration by the zero-point field (ZPE) when the ZPE is taken in a realistic sense (in opposition to a virtual field) was considered. Originally the idea was developed within a semiclassical context. The classical Einstein-Hopf model (EHM) was used to show that free isolated electromagnrtically interacting particles performed a random walk in phase space and more importantly in momentum space when submitted to the perennial action of the so called classical electromagnrtic ZPE.

  10. Clinical decision-making: the case against the new casuistry.

    PubMed

    Ananth, Mahesh

    2017-01-01

    Albert Jonsen and Stephen Toulmin have argued that the best way to resolve the complex issues in medical settings is to focus on the actual details of cases and then determine what to do in the given cases. This approach to medical decision-making, labeled "casuistry," has met with much criticism. In response, Carson Strong has attempted to save much of Jonsen and Toulmin's version of casuistry. This analysis reveals that Strong's recent salvage efforts fail to deflect the major criticisms. The upshot of this analysis is that Jonsen and Toulmin's version of casuistry is not an appropriate framework from which to resolve complex issues in clinical settings. Copyright © 2017 by the National Legal Center for the Medically Dependent and Disabled, Inc.

  11. Citizen science for water quality monitoring: Data implications of citizen perspectives.

    PubMed

    Jollymore, Ashlee; Haines, Morgan J; Satterfield, Terre; Johnson, Mark S

    2017-09-15

    Citizen science, where citizens play an active role in the scientific process, is increasingly used to expand the reach and scope of scientific research while also achieving engagement and educational goals. Despite the emergence of studies exploring data outcomes of citizen science, the process and experience of engaging with citizens and citizen-lead groups through participatory science is less explored. This includes how citizen perspectives alter data outcomes, a critical upshot given prevalent mistrust of citizen versus scientist data. This study uses a citizen science campaign investigating watershed impacts on water quality to interrogate the nature and implications of citizen involvement in producing scientifically and societally relevant data. Data representing scientific outcomes are presented alongside a series of vignettes that offer context regarding how, why, and where citizens engaged with the project. From these vignettes, six specific lessons are examined towards understanding how integration of citizen participation alters data outcomes relative to 'professional' science. In particular, elements of participant social identity (e.g., their motivation for participation), and contextual knowledge (e.g., of the research program itself) can shape participation and resulting data outcomes. Such scientific outcomes are particularly relevant given continued concerns regarding the quality of citizen data, which could hinder scientific acceptance of citizen sciences. Importantly, the potential for meaningful engagement with citizen and participants within citizen groups - given significant capacity within the community - represents a substantial and under-realized opportunity. Copyright © 2017 Elsevier Ltd. All rights reserved.

  12. The Islamic prayer (Salah/Namaaz) and yoga togetherness in mental health.

    PubMed

    Sayeed, Shabbir Ahmed; Prakash, Anand

    2013-01-01

    Religion and its practices have been duly implicated in treating not only problems related to medical health, rather, intervening and preventing such problems as well. In the present article, the authors have reviewed significance of the Islamic prayers (Salah/Namaaz) in healthcare in general and mental health in particular. The nature, procedures, practices and the benefits of Salah have been comprehensively described and discussed. In addition, an attempt to combine yoga and its practices with Salah has been made for intervening and preventing the problems of mental health as an expeditious tool. In upshot, the clinicians in the field of mental health care have been suggested to incorporate these two viewpoints in their intervention program, at least, for the Muslim patients for a more desirable outcome.

  13. The Islamic prayer (Salah/Namaaz) and yoga togetherness in mental health

    PubMed Central

    Sayeed, Shabbir Ahmed; Prakash, Anand

    2013-01-01

    Religion and its practices have been duly implicated in treating not only problems related to medical health, rather, intervening and preventing such problems as well. In the present article, the authors have reviewed significance of the Islamic prayers (Salah/Namaaz) in healthcare in general and mental health in particular. The nature, procedures, practices and the benefits of Salah have been comprehensively described and discussed. In addition, an attempt to combine yoga and its practices with Salah has been made for intervening and preventing the problems of mental health as an expeditious tool. In upshot, the clinicians in the field of mental health care have been suggested to incorporate these two viewpoints in their intervention program, at least, for the Muslim patients for a more desirable outcome. PMID:23858258

  14. Experiments on topographies lacking tidal conversion

    NASA Astrophysics Data System (ADS)

    Maas, Leo; Paci, Alexandre; Yuan, Bing

    2015-11-01

    In a stratified sea, internal tides are supposedly generated when the tide passes over irregular topography. It has been shown that for any given frequency in the internal wave band there are an infinite number of exceptions to this rule of thumb. This ``stealth-like'' property of the topography is due to a subtle annihilation of the internal waves generated during the surface tide's passage over the irregular bottom. We here demonstrate this in a lab-experiment. However, for any such topography, subsequently changing the surface tide's frequency does lead to tidal conversion. The upshot of this is that a tidal wave passing over an irregular bottom is for a substantial part trapped to this irregularity, and only partly converted into freely propagating internal tides. Financially supported by the European Community's 7th Framework Programme HYDRALAB IV.

  15. Attention and Conscious Perception in the Hypothesis Testing Brain

    PubMed Central

    Hohwy, Jakob

    2012-01-01

    Conscious perception and attention are difficult to study, partly because their relation to each other is not fully understood. Rather than conceiving and studying them in isolation from each other it may be useful to locate them in an independently motivated, general framework, from which a principled account of how they relate can then emerge. Accordingly, these mental phenomena are here reviewed through the prism of the increasingly influential predictive coding framework. On this framework, conscious perception can be seen as the upshot of prediction error minimization and attention as the optimization of precision expectations during such perceptual inference. This approach maps on well to a range of standard characteristics of conscious perception and attention, and can be used to interpret a range of empirical findings on their relation to each other. PMID:22485102

  16. Quadratic trigonometric B-spline for image interpolation using GA

    PubMed Central

    Abbas, Samreen; Irshad, Misbah

    2017-01-01

    In this article, a new quadratic trigonometric B-spline with control parameters is constructed to address the problems related to two dimensional digital image interpolation. The newly constructed spline is then used to design an image interpolation scheme together with one of the soft computing techniques named as Genetic Algorithm (GA). The idea of GA has been formed to optimize the control parameters in the description of newly constructed spline. The Feature SIMilarity (FSIM), Structure SIMilarity (SSIM) and Multi-Scale Structure SIMilarity (MS-SSIM) indices along with traditional Peak Signal-to-Noise Ratio (PSNR) are employed as image quality metrics to analyze and compare the outcomes of approach offered in this work, with three of the present digital image interpolation schemes. The upshots show that the proposed scheme is better choice to deal with the problems associated to image interpolation. PMID:28640906

  17. Quadratic trigonometric B-spline for image interpolation using GA.

    PubMed

    Hussain, Malik Zawwar; Abbas, Samreen; Irshad, Misbah

    2017-01-01

    In this article, a new quadratic trigonometric B-spline with control parameters is constructed to address the problems related to two dimensional digital image interpolation. The newly constructed spline is then used to design an image interpolation scheme together with one of the soft computing techniques named as Genetic Algorithm (GA). The idea of GA has been formed to optimize the control parameters in the description of newly constructed spline. The Feature SIMilarity (FSIM), Structure SIMilarity (SSIM) and Multi-Scale Structure SIMilarity (MS-SSIM) indices along with traditional Peak Signal-to-Noise Ratio (PSNR) are employed as image quality metrics to analyze and compare the outcomes of approach offered in this work, with three of the present digital image interpolation schemes. The upshots show that the proposed scheme is better choice to deal with the problems associated to image interpolation.

  18. The Ethics of Producing In Vitro Meat

    PubMed Central

    Schaefer, G Owen; Savulescu, Julian

    2014-01-01

    The prospect of consumable meat produced in a laboratory setting without the need to raise and slaughter animals is both realistic and exciting. Not only could such in vitro meat become popular due to potential cost savings, but it also avoids many of the ethical and environmental problems with traditional meat productions. However, as with any new technology, in vitro meat is likely to face some detractors. We examine in detail three potential objections: 1) in vitro meat is disrespectful, either to nature or to animals; 2) it will reduce the number of happy animals in the world; and 3) it will open the door to cannibalism. While each objection has some attraction, we ultimately find that all can be overcome. The upshot is that in vitro meat production is generally permissible and, especially for ethical vegetarians, worth promoting. PMID:25954058

  19. Threats: power, family mealtimes, and social influence.

    PubMed

    Hepburn, Alexa; Potter, Jonathan

    2011-03-01

    One of the most basic topics in social psychology is the way one agent influences the behaviour of another. This paper will focus on threats, which are an intensified form of attempted behavioural influence. Despite the centrality to the project of social psychology, little attention has been paid to threats. This paper will start to rectify this oversight. It reviews early examples of the way social psychology handles threats and highlights key limitations and presuppositions about the nature and role of threats. By contrast, we subject them to a programme of empirical research. Data comprise video records of a collection of family mealtimes that include preschool children. Threats are recurrent in this material. A preliminary conceptualization of features of candidate threats from this corpus will be used as an analytic start point. A series of examples are used to explicate basic features and dimensions that build the action of threatening. The basic structure of the threats uses a conditional logic: if the recipient continues problem action/does not initiate required action then negative consequences will be produced by the speaker. Further analysis clarifies how threats differ from warnings and admonishments. Sequential analysis suggests threats set up basic response options of compliance or defiance. However, recipients of threats can evade these options by, for example, reworking the unpleasant upshot specified in the threat, or producing barely minimal compliance. The implications for broader social psychological concerns are explored in a discussion of power, resistance, and asymmetry; the paper ends by reconsidering the way social influence can be studied in social psychology. ©2010 The British Psychological Society.

  20. Broadening the future of value account of the wrongness of killing.

    PubMed

    Di Nucci, Ezio

    2015-11-01

    On Don Marquis's future of value account of the wrongness of killing, 'what makes it wrong to kill those individuals we all believe it is wrong to kill, is that killing them deprives them of their future of value'. Marquis has recently argued for a narrow interpretation of his future of value account of the wrongness of killing and against the broad interpretation that I had put forward in response to Carson Strong. In this article I argue that the narrow view is problematic because it violates some basic principles of equality and because it allows for some of the very killing that Marquis sets out to condemn; further, I argue that the chief reason why Marquis chooses the narrow view over the broad view-namely that the broad view would take the killing of some non-human animals to be also wrong-should rather be considered a welcome upshot of the broad view.

  1. Weismann, Wittgenstein and the homunculus fallacy.

    PubMed

    Smit, Harry

    2010-09-01

    A problem that has troubled both neo-Darwinists and neo-Lamarckians is whether instincts involve knowledge. This paper discusses the contributions to this problem of the evolutionary biologist August Weismann and the philosopher Ludwig Wittgenstein. Weismann discussed an empirical homunculus fallacy: Lamarck's theory mistakenly presupposes a homunculus in the germ cells. Wittgenstein discussed a conceptual homunculus fallacy which applies to Lamarck's theory: it is mistaken to suppose that knowledge is stored in the brain or DNA. The upshot of these two fallacies is that instincts arise through a neo-Darwinian process but are not cognitions in the sense that they involve (the recollection of stored) knowledge. Although neo-Lamarckians have rightly argued that learning processes may contribute to the development of instincts, their ideas about the role of knowledge in the evolution and development of instincts are mistaken. Copyright © 2010 Elsevier Ltd. All rights reserved.

  2. The virtue ethics approach to bioethics.

    PubMed

    Holland, Stephen

    2011-05-01

    This paper discusses the viability of a virtue-based approach to bioethics. Virtue ethics is clearly appropriate to addressing issues of professional character and conduct. But another major remit of bioethics is to evaluate the ethics of biomedical procedures in order to recommend regulatory policy. How appropriate is the virtue ethics approach to fulfilling this remit? The first part of this paper characterizes the methodology problem in bioethics in terms of diversity, and shows that virtue ethics does not simply restate this problem in its own terms. However, fatal objections to the way the virtue ethics approach is typically taken in bioethics literature are presented in the second section of the paper. In the third part, a virtue-based approach to bioethics that avoids the shortcomings of the typical one is introduced and shown to be prima facie plausible. The upshot is an inviting new direction for research into bioethics' methodology. © 2009 Blackwell Publishing Ltd.

  3. Global ethics and principlism.

    PubMed

    Gordon, John-Stewart

    2011-09-01

    This article examines the special relation between common morality and particular moralities in the four-principles approach and its use for global ethics. It is argued that the special dialectical relation between common morality and particular moralities is the key to bridging the gap between ethical universalism and relativism. The four-principles approach is a good model for a global bioethics by virtue of its ability to mediate successfully between universal demands and cultural diversity. The principle of autonomy (i.e., the idea of individual informed consent), however, does need to be revised so as to make it compatible with alternatives such as family- or community-informed consent. The upshot is that the contribution of the four-principles approach to global ethics lies in the so-called dialectical process and its power to deal with cross-cultural issues against the background of universal demands by joining them together.

  4. Synthesis and microstructural studies of annealed Cu(2)O/Cu(x)S bilayer as transparent electrode material for photovoltaic and energy storage devices.

    PubMed

    Taleatu, B A; Arbab, E A A; Omotoso, E; Mola, G T

    2014-10-01

    Cu2 O thin film and a transparent bilayer have been fabricated by electrodeposition method. The growths were obtained in potentiostatic mode with gradual degradation of anodic current. X-ray diffraction (XRD) study showed that the bilayer is polycrystalline and it possesses mixture of different crystallite phases of copper oxides. Surface morphology of the films was investigated by scanning electron microscopy (SEM). The SEM images revealed that the films were uniformly distributed and the starting material (Cu2 O) had cubical structure. Grains agglomeration and crystallinity were enhanced by annealing. Optical studies indicated that all the samples have direct allowed transition. Energy band gap of the bilayer film was reduced by annealing treatment thus corroborating quantum confinement upshot. © 2014 The Authors Journal of Microscopy © 2014 Royal Microscopical Society.

  5. Mathematical Analysis of an SIQR Influenza Model with Imperfect Quarantine.

    PubMed

    Erdem, Mustafa; Safan, Muntaser; Castillo-Chavez, Carlos

    2017-07-01

    The identification of mechanisms responsible for recurrent epidemic outbreaks, such as age structure, cross-immunity and variable delays in the infective classes, has challenged and fascinated epidemiologists and mathematicians alike. This paper addresses, motivated by mathematical work on influenza models, the impact of imperfect quarantine on the dynamics of SIR-type models. A susceptible-infectious-quarantine-recovered (SIQR) model is formulated with quarantined individuals altering the transmission dynamics process through their possibly reduced ability to generate secondary cases of infection. Mathematical and numerical analyses of the model of the equilibria and their stability have been carried out. Uniform persistence of the model has been established. Numerical simulations show that the model supports Hopf bifurcation as a function of the values of the quarantine effectiveness and other parameters. The upshot of this work is somewhat surprising since it is shown that SIQR model oscillatory behavior, as shown by multiple researchers, is in fact not robust to perturbations in the quarantine regime.

  6. Slowed ageing, welfare, and population problems.

    PubMed

    Wareham, Christopher

    2015-10-01

    Biological studies have demonstrated that it is possible to slow the ageing process and extend lifespan in a wide variety of organisms, perhaps including humans. Making use of the findings of these studies, this article examines two problems concerning the effect of life extension on population size and welfare. The first--the problem of overpopulation--is that as a result of life extension too many people will co-exist at the same time, resulting in decreases in average welfare. The second--the problem of underpopulation--is that life extension will result in too few people existing across time, resulting in decreases in total welfare. I argue that overpopulation is highly unlikely to result from technologies that slow ageing. Moreover, I claim that the problem of underpopulation relies on claims about life extension that are false in the case of life extension by slowed ageing. The upshot of these arguments is that the population problems discussed provide scant reason to oppose life extension by slowed ageing.

  7. How Christian ethics became medical ethics: the case of Paul Ramsey.

    PubMed

    Hauerwas, Stanley

    1995-03-01

    Over the last century Christian ethics has moved from an attempt to Christianize the social order to a quandary over whether being Christian unduly biases how medical ethics is done. This movement can be viewed as the internal development of protestant liberalism to its logical conclusion, and Paul Ramsey can be taken as one of the last great representatives of that tradition. By reducing the Christian message to the 'ethical upshot' of neighbour love, Ramsey did not have the resources to show how Christian practice might make a difference for understanding or forming the practice of medicine. Instead, medicine became the practice that exemplified the moral commitments of Christian civilization, and the goal of the ethicist was to identify the values that were constitutive of medicine. Ramsey thus prepared the way for the Christian ethicist to become a medical ethicist with a difference, and the difference simply involved vague theological presumptions that do no serious intellectual work other than explaining, perhaps, the motivations of the ethicist.

  8. Scepticism about the virtue ethics approach to nursing ethics.

    PubMed

    Holland, Stephen

    2010-07-01

    Nursing ethics centres on how nurses ought to respond to the moral situations that arise in their professional contexts. Nursing ethicists invoke normative approaches from moral philosophy. Specifically, it is increasingly common for nursing ethicists to apply virtue ethics to moral problems encountered by nurses. The point of this article is to argue for scepticism about this approach. First, the research question is motivated by showing that requirements on nurses such as to be kind, do not suffice to establish virtue ethics in nursing because normative rivals (such as utilitarians) can say as much; and the teleology distinctive of virtue ethics does not transpose to a professional context, such as nursing. Next, scepticism is argued for by responding to various attempts to secure a role for virtue ethics in nursing. The upshot is that virtue ethics is best left where it belongs - in personal moral life, not professional ethics - and nursing ethics is best done by taking other approaches.

  9. A legal market in organs: the problem of exploitation.

    PubMed

    Greasley, Kate

    2014-01-01

    The article considers the objection to a commercial market in living donor organs for transplantation on the ground that such a market would be exploitative of the vendors. It examines a key challenge to that objection, to the effect that denying poor people the option to sell an organ is to withhold from them the best that a bad situation has to offer. The article casts serious doubt on this attempt at justifying an organ market, and its philosophical underpinning. Drawing, in part, from the catalogued consequences of a thriving kidney market in some parts of India, it is argued that the justification relies on conditions which are extremely unlikely to obtain, even in a regulated donor market: that organ selling meaningfully improves the material situation of the organ vendor. Far from being axiomatic, both logic and the extant empirical evidence point towards the unlikelihood of such an upshot. Finally, the article considers a few conventional counter-arguments in favour of a permissive stance on organ sales.

  10. A random walk approach to quantum algorithms.

    PubMed

    Kendon, Vivien M

    2006-12-15

    The development of quantum algorithms based on quantum versions of random walks is placed in the context of the emerging field of quantum computing. Constructing a suitable quantum version of a random walk is not trivial; pure quantum dynamics is deterministic, so randomness only enters during the measurement phase, i.e. when converting the quantum information into classical information. The outcome of a quantum random walk is very different from the corresponding classical random walk owing to the interference between the different possible paths. The upshot is that quantum walkers find themselves further from their starting point than a classical walker on average, and this forms the basis of a quantum speed up, which can be exploited to solve problems faster. Surprisingly, the effect of making the walk slightly less than perfectly quantum can optimize the properties of the quantum walk for algorithmic applications. Looking to the future, even with a small quantum computer available, the development of quantum walk algorithms might proceed more rapidly than it has, especially for solving real problems.

  11. [The social hygienic model of organization of preventive activities concerning rural population of the Omskaia oblast].

    PubMed

    Berehnoii, V G

    2016-01-01

    The study was carried out concerning environmental factors and social hygienic portrait of rural residents. The analysis determined environmental, social and behavioral risk factors of health. The pathologies of risk for rural residents were substantiated. In conditions of degradation of accessibility of medical care to inhabitants residing outside of district centers specified by decreasing of capacity of hospital medical care and decreasing of accessibility of out-patient services, the visiting trips of physicians ’ teams and activities concerning development of hygienic literacy were organized in 2012-2014. This approach permitted ameliorating health indices and organization of medical care for the given category of citizen, including positive results in decreasing of mortality, timely diagnostic of diseases, reduction of number of emergency operations in central district hospitals and attenuation of intensity of impact of regulative risk factors. All this determined in the upshot social and economic effectiveness of advanced model of prevention of health disorders of rural residents.

  12. Improving the biogas production performance of municipal waste activated sludge via disperser induced microwave disintegration.

    PubMed

    Kavitha, S; Rajesh Banu, J; Vinoth Kumar, J; Rajkumar, M

    2016-10-01

    In this study, the influence of disperser induced microwave pretreatment was investigated to analyze the proficiency of floc disruption on subsequent disintegration and biodegradability process. Initially, the flocs in the sludge was disrupted through disperser at a specific energy input of 25.3kJ/kgTS. The upshot of the microwave disintegration presents that the solids reduction and solubilization of floc disrupted (disperser induced microwave pretreated) sludge was found to be 17.33% and 22% relatively greater than that achieved in microwave pretreated (9.3% and 16%) sludge alone. The biodegradability analysis, affords an evaluation of parameter confidence and correlation determination. The eventual biodegradability of microwave pretreated, and floc disrupted sludges were computed to be 0.15(gCOD/gCOD) and 0.28(gCOD/gCOD), respectively. An economic assessment of this study offers a positive net profit of about 104.8USD/ton of sludge in floc disrupted sample. Copyright © 2016 Elsevier Ltd. All rights reserved.

  13. Environmental Heat Stress Among Young Working Women: A Pilot Study.

    PubMed

    Rahman, Juma; Fakhruddin, S H M; Rahman, A K M Fazlur; Halim, M A

    Heat waves are increasing significantly in frequency and severity and threaten the health and income of outdoor workers. Pregnant women workers are particularly at risk due to their delicate physiological systems and accountabilities to future generations. Animal and human studies propose that elevated body temperatures during pregnancy can induce adverse pregnancy outcomes. To measure the change in internal body temperature (Tcore) in young working women before, after, and during work (both outdoor and indoor) on hot humid days and relate threshold temperature to the upshot adverse effects of pregnancy (teratogenicity and related miscarriage). Tympanic temperatures were measured using infrared ear thermometers and workplace temperatures were collected using Lascar Data Logger. Brief exploratory interviews were conducted to gather qualitative data, and content analysis was also carried out. Body temperatures were found elevated among outdoor women workers compared with that of indoor women workers. The present study found that outdoor work during pregnancy in hot, humid days might increase body temperature up to levels that could induce fetal destruction or anomaly. Copyright © 2016 Icahn School of Medicine at Mount Sinai. Published by Elsevier Inc. All rights reserved.

  14. Is it good to make happy people?

    PubMed

    Rachels, Stuart

    1998-04-01

    Would it be good, other things being equal, for additional people to exist whose lives would be worth living? I examine and reject several arguments for the answer that it would not be good; then I offer opposing arguments that I believe are more successful. Thus, I agree with utilitarians who say that it is better for there to be more happy people. Next I argue for the stronger claim that the happiness of potential people is as important as that of adults. Potential quality of life, then, matters in a host of bioethical issues: abortion, commercial surrogacy, the treatment of defective newborns, and so on. What is the practical upshot of all this? I reject the idea that we must do whatever is necessary to prolong life worth living. But I also reject the view that the side-effects of overpopulation always outweigh the value of realizing potential happiness. So I advocate a middle position, which I do not identify precisely. Even from this middle position, however, potential happiness is more important that is commonly assumed in bioethics.

  15. Positive upshots of cortisol in everyday life

    PubMed Central

    Hoyt, Lindsay T.; Zeiders, Katharine H.; Ehrlich, Katherine B.; Adam, Emma K.

    2016-01-01

    Cortisol, the major physiological end-product of the hypothalamic-pituitary-adrenal (HPA) axis, is usually associated with stress and negative affect. However, a new body of research highlights the complex, adaptive significance of elevated cortisol within individuals in everyday life. Whereas most studies do not have the power to test the dynamic transactions between cortisol and affect within a person throughout the entire waking day, we employed an intensive study protocol analyzing hourly diary reports of affect in relation to hourly salivary cortisol samples among 24 healthy adults from morning to bedtime, across two consecutive weekdays (n = 862 total samples). Utilizing multi-leveling modeling and focusing on within-person effects, we examined whether momentary increases in cortisol could be mood protective, or energy enhancing, in everyday life, supporting the cortisol boost hypothesis. Results revealed no significant associations between cortisol and current affective state; however, within-person increases in cortisol were significantly associated with subsequent rises in activeness, alertness, and relaxation, and trend-level reductions in stress and nervousness. This study adds to growing evidence that cortisol plays a positive role in regulating affect in everyday life. PMID:26950364

  16. Milestone Completion Report WBS 1.3.5.05 ECP/VTK-m FY17Q2 [MS-17/01] Better Dynamic Types Design SDA05-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moreland, Kenneth D.

    The FY17Q2 milestone of the ECP/VTK-m project, which is the first milestone, includes the completion of design documents for the introduction of virtual methods into the VTK-m framework. Specifically, the ability from within the code of a device (e.g. GPU or Xeon Phi) to jump to a virtual method specified at run time. This change will enable us to drastically reduce the compile time and the executable code size for the VTK-m library. Our first design introduced the idea of adding virtual functions to classes that are used during algorithm execution. (Virtual methods were previously banned from the so calledmore » execution environment.) The design was straightforward. VTK-m already has the generic concepts of an “array handle” that provides a uniform interface to memory of different structures and an “array portal” that provides generic access to said memory. These array handles and portals use C++ templating to adjust them to different memory structures. This composition provides a powerful ability to adapt to data sources, but requires knowing static types. The proposed design creates a template specialization of an array portal that decorates another array handle while hiding its type. In this way we can wrap any type of static array handle and then feed it to a single compiled instance of a function. The second design focused on the mechanics of implementing virtual methods on parallel devices with a focus on CUDA. Our initial experiments on CUDA showed a very large overhead for using virtual C++ classes with virtual methods, the standard approach. Instead, we are using an alternate method provided by C that uses function pointers. With the completion of this milestone, we are able to move to the implementation of objects with virtual (like) methods. The upshot will be much faster compile times and much smaller library/executable sizes.« less

  17. Potential modulations of pre-monsoon aerosols during El Niño: impact on Indian summer monsoon

    NASA Astrophysics Data System (ADS)

    Fadnavis, S.; Roy, Chaitri; Sabin, T. P.; Ayantika, D. C.; Ashok, K.

    2017-10-01

    The potential role of aerosol loading on the Indian summer monsoon rainfall during the El Niño years are examined using satellite-derived observations and a state of the art fully interactive aerosol-chemistry-climate model. The Aerosol Index (AI) from TOMS (1978-2005) and Aerosol Optical Depth (AOD) from MISR spectroradiometer (2000-2010) indicate a higher-than-normal aerosol loading over the Indo-Gangetic plain (IGP) during the pre-monsoon season with a concurrent El Niño. Sensitivity experiments using ECHAM5-HAMMOZ climate model suggests that this enhanced loading of pre-monsoon absorbing aerosols over the Indo-Gangetic plain can reduce the drought during El Niño years by invoking the `Elevated-Heat-Pump' mechanism through an anomalous aerosol-induced warm core in the atmospheric column. This anomalous heating upshot the relative strengthening of the cross-equatorial moisture inflow associated with the monsoon and eventually reduces the severity of drought during El Niño years. The findings are subject to the usual limitations such as the uncertainties in observations, and limited number of El Niño years (during the study period).

  18. [Study of career motivators affecting the emotional labour of health care professionals in oncology].

    PubMed

    Szluha, Kornélia; Lazányi, Kornélia; Horváth, Akos; Szántó, János; Tóth, Judit; Hernádi, Zoltán; Póka, Róbert; Damjanovich, László; Garami, Zoltán; Fülöp, Balázs; Molnár, Péter

    2008-03-01

    In the course of their everyday work health care professionals (HCPs) often have to change their true feelings. The literature labels this performance as emotional labor. This article is presenting data on the characteristics of HCPs' most endangered by the negative consequences of emotional labor. Our simple choice question survey was conducted at Debrecen University Medical Healthcare Center with the help of 50 oncology HCPs volunteers. Nearly 90% of the HCPs examined change their true feelings in the course of work. It is very difficult to classify those threatened by the negative upshot of this emotional labor. Due to our research we found appalling differences of work motivation that were tightly interconnected with the respondents' emotional labor and their perceived role/emotional expectations. We succeeded in establishing three clusters and defining each cluster's characteristics. Figures suggest that only somewhat more than the half of the HCPs is authentic professional helper, and 45% of them does not or only slightly perceive the patients' demands concerning their work. Therefore, it is important that the work environment does not only assist the work of HCPs by professional means, but along emotional dimensions as well.

  19. Conceptions of reality and the experience of pain. Comment on “Facing the experience of pain: A neuropsychological perspective” by Fabbro and Crescentini

    NASA Astrophysics Data System (ADS)

    De Anna, Gabriele

    2014-09-01

    A core of neurobiological mechanisms is implicated in different forms of pain. Fabbro and Crescentini [4] show that this fact is significant both on the scientific level and on the philosophical level. Their main philosophical claim is that the existence of a neural circuit devoted to the experience of time suggests that time might not be real. An upshot would be that the objects which populate the world of our experience might not be real either, and hence the attachment to them and the mechanisms of pain for the separation from them that were developed through evolution would be misplaced. By contrast, in their view, we inhabit a Heraclitean or Buddhist world of processes: indeed, by inhibiting our time circuits, mindful meditation releases us from perceiving reality as a world of objects and thereby reliefs us from pain. Fabbro and Crescentini remark on a limitation of attempts to employ mindful meditation as a pain killer in clinical contexts: a long time of meditation practice is needed for a subject to be able to alleviate pain through that method.

  20. Fabrication of ternary Ni-TiO2-TiC composite coatings and their enhanced microhardness for metal finishing application

    NASA Astrophysics Data System (ADS)

    Kumaraguru, S.; Kumar, Gopika G.; Raghu, S.; Gnanamuthu, RM.

    2018-07-01

    Nickel (Ni) is extensively used for major engineering application. But nickel exhibits lower mechanical properties such as hardness and wear resistance than Ni-based composite materials. So, in this work, we significantly improve the mechanical properties of Ni by incorporating titanium dioxide (TiO2) and titanium carbide (TiC) particles. Ni-TiO2-TiC composite coatings are successfully prepared on mild steel specimens by means of electrodeposition technique. The prepared coatings are characterized by employing X-ray diffraction (XRD), energy dispersive X-ray fluorescence spectroscopy (EDXRF), scanning electron microscopy (SEM), atomic force microscopy (AFM) and Vicker's hardness tester. The surface morphological analysis points out the growth of cauliflower morphology and pyramid-like structure decorated with spherical particles at room temperature. Likewise, hill-valley like structure has been formed in the electrolyte temperature of 75 °C. The upshot of electrolyte temperature and concentration of TiO2-TiC particles on the microhardness of the composite deposits is investigated. The microhardness value is superior when the higher quantity of TiO2-TiC particles encapsulated in the coatings.

  1. Indoor air quality scenario in India-An outline of household fuel combustion

    NASA Astrophysics Data System (ADS)

    Rohra, Himanshi; Taneja, Ajay

    2016-03-01

    Most of the research around the world has been on outdoor air pollution, but in India we have a more severe problem of Indoor Air Pollution (IAP). The foremost factor cited for is burning of fossil fuels for cooking. Among the 70% of the country's rural population, about 80% households rely on biomass fuel making India to top the list of countries with largest population lacking access to cleaner fuel for cooking. 4 million deaths and 5% disability-adjusted life-years is an upshot of exposure to IAP from unhealthy cooking making it globally the most critical environmental risk factor. India alone bears the highest burden (28% needless deaths) among developing countries. Moreover, about ¼ of ambient PM2.5 in the country comes from household cookfuels. These considerations have prompted the discussion of the present knowledge on the disastrous health effects of pollutants emitted by biomass combustion in India. Additionally, Particulate Matter as an indoor air pollutant is highlighted with main focus on its spatial temporal variation and some recent Indian studies are further explored. As there are no specific norms for IAP in India, urgent need has arisen for implementing the strategies to create public awareness. Moreover improvement in ventilation and modification in the pattern of fuel will also contribute to eradicate this national health issue.

  2. Assessment of densification and mechanical property of AISI 8630 steel composition on different heat treatments produced through hot upsetting powder preform forging

    NASA Astrophysics Data System (ADS)

    Bala, Y. G.; Sankaranarayanan, S. Raman; Pandey, K. S.

    2015-11-01

    The present investigation was carried out to evaluate the densification, mechanical properties, microstructural and fractrography effects of AISI 8630 steel composition developed through powder preform forging under different heat treated conditions. Sintered preforms of different aspect ratios such as 0.6, 0.9, and 1.2 were hot upset forged to disc shape to different height strain to analysis the densification mechanism. Certain relationships relating strains, Poisson's ratio relating densification have revealed the effect of preform geometry on densification kinetics and resulted in the polynomial expression with justified regression coefficient greater the 0.9 or unity. The preforms of aspect ratio of 1.1 were hot upset forged to square cross section bars and transferred to different quenching medium like oil, water, furnace and air to assess its mechanical properties. Comparing the temperament of the heat treatments, sintered forged homogenised water quenched sample upshot in the maximum Tensile strength with least per centage elongation andthe furnace cooled sample shows the maximum toughness with desirable per centage elongation and least tensile strength. Microstructure stated the presence of varying ferrite and pearlite distribution and fractograph studies has disclosed the mixed mode of failure on the effect of varying heat treatments progression has affected the properties significantly.

  3. Pendula, Models, Constructivism and Reality

    NASA Astrophysics Data System (ADS)

    Nola, Robert

    It is argued that Galileo made an important breakthrough in the methodology of science by considering idealized models of phenomena such as free fall, swinging pendula and the like, which can conflict with experience. Theidealized models are constructs largely by our reasoning processes applied to the theoretical situation at hand. Onthis view, scientific knowledge is not a construction out of experience, as many constructivists claim about both the methods of science and about the learning of science. In fact Galileo's models can, depending on their degree of idealization or concretization, be at variance with experience. This paper considers what is meant by idealization and concretization of both the objects and properties that makeup theoretical models, and the ideal laws that govern them. It also provides brief illustrations of ideal laws and how they may be made more concrete, and briefly considers how theories and models might be tested against what we observe.Finally some difficulties are raised for a radical constructivist approach to both science and learning in the light of Galileo's methodological approach. The upshot is that both the dialogue structure of Galileo's writings and his method of model building provide a rich resource for science education that rivals that of the standard varieties of constructivism, and at the same time gives a much better picture of the actual procedures of science itself.

  4. Imposing options on people in poverty: the harm of a live donor organ market.

    PubMed

    Rippon, Simon

    2014-03-01

    A prominent defence of a market in organs from living donors says that if we truly care about people in poverty, we should allow them to sell their organs. The argument is that if poor vendors would have voluntarily decided to sell their organs in a free market, then prohibiting them from selling makes them even worse off, at least from their own perspective, and that it would be unconscionably paternalistic to substitute our judgements for individuals' own judgements about what would be best for them. The author shows that this 'Laissez-Choisir Argument' for organ selling rests on a mistake. This is because the claim that it would be better for people in poverty to sell their organs if given the option is consistent with the claim that it would be even better for them to not have the option at all. The upshot is that objections to an organ market need not be at all paternalistic, since we need not accept that the absence of a market makes those in poverty any worse off, even from their own point of view. The author goes on to argue that there are strong theoretical and empirical reasons for believing that people in poverty would in fact be harmed by the introduction of a market for live donor organs and that the harm constitutes sufficient grounds for prohibiting a market.

  5. Investigating wound healing, tyrosinase inhibitory and antioxidant activities of the ethanol extracts of Salvia cryptantha and Salvia cyanescens using in vivo and in vitro experimental models.

    PubMed

    Süntar, Ipek; Akkol, Esra Küpeli; Senol, Fatma Sezer; Keles, Hikmet; Orhan, Ilkay Erdogan

    2011-04-26

    Salvia L. species are widely used against wounds and skin infections in Turkish folk medicine. The aim of the present study is to evaluate wound healing activity of the ethanol (EtOH) extracts of Salvia cryptantha and Salvia cyanescens. For the assessment of wound healing activity linear incision and circular excision wound models were employed on rats and mice. The wound healing effect was comparatively evaluated with the standard skin ointment Madecassol(®). Inhibition of tyrosinase, a key enzyme in skin aging, was achieved using ELISA microplate reader. Antioxidant activity was evaluated by 2,2-diphenyl-1-picrylhydrazyl (DPPH) and superoxide radical scavenger effect, ferrous ion-chelating ability, and ferric-reducing antioxidant power (FRAP) tests. The EtOH extract of Salvia cryptantha treated groups of animals showed 56.5% contraction, whereas the reference drug Madecassol(®) showed 100% contraction. On the other hand, the same extract on linear incision wound model demonstrated a significant increase (33.2%) in wound tensile strength as compared to other groups. The results of histopathological examination maintained the upshot of linear incision and circular excision wound models as well. These findings specify that Salvia cryptantha for wound healing activity can be appealed further phytochemical estimation for spotting its active components. Copyright © 2011 Elsevier Ireland Ltd. All rights reserved.

  6. [Rainer Werner Fassbinder's "Garbage, the city and death"-- a German landscape of the soul].

    PubMed

    Vogt, R

    1995-04-01

    No other recent "art event" has aroused so much public debate in Germany as Fassbinder's play "Garbage, City, Death" (1976). The controversy it sparked on its appearance has still not entirely died down. In a painstaking psychoanalytic interpretation Vogt first shows that the play achieves an artistic representation of the unconscious dilemma besetting the second generation of non-Jewish Germans in their relationship to National Socialism. In Fassbinder's play this dilemma, which is bound up with vicarious guilt feelings, is however only presented and not in any way worked out. The upshot is that all those forms of identification with German traditions that have been repudiated on a conscious level re-enter, as it were by the back door, and attain a new virulence. The author demonstrates that at the heart of the play a mechanism of guilt-refusal is operative that inverts the historical culprit-victim relation and makes the Germans themselves into the real victims. In the second part of his article Vogt is concerned to situate the play and the controversy surrounding it in a broader political context--Bitburg (1985), the "historians' conflict" (1986), Jenninger's speech (1988)--revealing a specific collective psychological inscape in present-day Germany for which, in its profounder well-springs, Fassbinder's play may be legitimately regarded as symptomatic. Fassbinder (born 1945) articulates for his generation aspects of an "ethnic disturbance" (George Devereux) which continues to persist precisely because there is a German past "that refuses to go away" (Ernst Nolte).

  7. Upshot of natural graphite inclusion on the performance of porous conducting carbon fiber paper in a polymer electrolyte membrane fuel cell

    NASA Astrophysics Data System (ADS)

    Kaushal, Shweta; Negi, Praveen; Sahu, A. K.; Dhakate, S. R.

    2017-09-01

    Porous conducting carbon fiber paper (PCCFP) is one of the vital component of the gas diffusion layer (GDL) in a fuel cell. This PCCFP serves as the most suitable substrate for the GDL due to its electrical conductivity, mechanical properties, and porosity. In this approach, carbon fiber composite papers were developed by incorporating different fractions of natural graphite (NG) in the matrix phase, i.e. Phenolic resin, and using the combined process of paper making and carbon-carbon composite formation technique. These prepared samples were then heat treated at 1800 °C in an inert atmosphere. The effect of natural graphite incorporation was ascertained by characterizing porous carbon paper by various techniques i.e. X-ray diffraction, Raman spectroscopy, Scanning electron microscopy, electrical and mechanical properties, and I-V performance in a unit fuel cell assembly. The inclusion of NG certainly enhance the properties of the carbon matrix as well as improving the conductive path of carbon fibers. In this study addition of 1 wt.% of natural graphite demonstrated a significant improvement in the electrical conductivity and performance of PCCFP and resulted in the improvement of power density from 361-563 mW cm-2. This paper reports that the uniform dispersion of NG was able to generate a maximum number of macrosize pores in the carbon paper that strengthened the flexural modulus from 4 to 12 GPa without compromising the porosity required for the GDL.

  8. Privacy versus care--The shifting balance in mental health.

    PubMed

    Mork, Mary Jean; Price, Steven; Best, Kathryn

    2016-03-01

    Mental health professionals are now debating client confidentiality and its relationship to care coordination. History tells us there is a need to protect the privacy of people who are diagnosed with mental health issues in a world filled with stigma and misperceptions. People with mental illness and substance use problems may be legitimately concerned that employers, insurance companies, financial institutions, medical practices, and educational institutions could use their health information to discriminate against them, often without their knowledge. The protection of jobs and health information is a real, justifiable benefit of privacy legislation. However, there are also a host of negative consequences, including fragmented health care, lack of prevention, uninformed families, and even early death, because of a lack of coordination with medical treatment. The legal situation can be very confusing, but the upshot is that we are shifting from an environment of strict confidentiality to one of better care coordination. In short, we are moving toward a system that allows for better coordination because it improves the quality of care for our clients. At the policy level, we must lead the change process and actively support the revision and reinterpretation of existing laws and regulations. These changes will require earning the trust of the people being served. Many are wary, and some even scared, of their perceived loss of privacy. Health-care professionals must commit to the concept of coordinating care, making communication about shared care plans a priority. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  9. Transition of population reproduction patterns in China.

    PubMed

    Zhou, X

    1985-04-01

    Rapid and drastic changes have taken place in the population reproduction pattern in China over the last 3 decades during which the traditional pattern of high birth rate and death rate gave way to the modern pattern of low birth rate and death rate. Man's capacity to reduce disease incidence and to lower mortality rates relies directly on the economic development of the society that makes the necessary conditions availiable to him. The drastic drop of the mortality rate in China since 1949 is not a result of the "propagation of Western medical knowledge and technology" alone; it is mainly an upshot of the changes in the social, political, and economic spheres that have taken place in the country. In the recent 10 years, China has brought down its birth rate and put population growth under plans, reflecting a deepening understanding of the objective laws in the realm of population development. This understanding includes the following aspects: 1) multiplication of human numbers is not the sole purpose of population growth, 2) the establishment of the socialist system has accelerated the mortality rate decline without being able to bring down the birth rate rapidly, and 3) population growth must be subjected to planning. With these points of understanding gradually deepened, China has made full use of its socialist institutional advantages to bring down its birth rate in a short time. The credit of the successful completion of fertility transition is due to China's advanced production relations and superior social system.

  10. Soil Salinity Mapping in Everglades National Park Using Remote Sensing Techniques

    NASA Astrophysics Data System (ADS)

    Su, H.; Khadim, F. K.; Blankenship, J.; Sobhan, K.

    2017-12-01

    The South Florida Everglades is a vast subtropical wetland with a globally unique hydrology and ecology, and it is designated as an International Biosphere Reserve and a Wetland of International Importance. Everglades National Park (ENP) is a hydro-ecologically enriched wetland with varying salinity contents, which is a concern for terrestrial ecosystem balance and sustainability. As such, in this study, time series soil salinity mapping was carried out for the ENP area. The mapping first entailed a maximum likelihood classification of seven land cover classes for the ENP area—namely mangrove forest, mangrove scrub, low-density forest, sawgrass, prairies and marshes, barren lands with woodland hammock and water—for the years 1996, 2000, 2006, 2010 and 2015. The classifications for 1996-2010 yielded accuracies of 82%-94%, and the 2015 classification was supported through ground truthing. Afterwards, electric conductivity (EC) tolerance thresholds for each vegetation class were established,which yielded soil salinity maps comprising four soil salinity classes—i.e., the non- (EC = 0 2 dS/m), low- (EC = 2 4 dS/m), moderate- (EC = 4 8 dS/m) and high-saline (EC = >8 dS/m) areas. The soil salinity maps visualized the spatial distribution of soil salinity with no significant temporal variations. The innovative approach of "land cover identification to salinity estimation" used in the study is pragmatic and application oriented, and the study upshots are also useful, considering the diversifying ecological context of the ENP area.

  11. Evaluation of spatial and temporal characteristics of GNSS-derived ZTD estimates in Nigeria

    NASA Astrophysics Data System (ADS)

    Isioye, Olalekan Adekunle; Combrinck, Ludwig; Botai, Joel

    2018-05-01

    This study presents an in-depth analysis to comprehend the spatial and temporal variability of zenith tropospheric delay (ZTD) over Nigeria during the period 2010-2014, using estimates from Global Navigation Satellite Systems (GNSS) data. GNSS data address the drawbacks in traditional techniques (e.g. radiosondes) by means of observing periodicities in ZTD. The ZTD estimates show weak spatial dependence among the stations, though this can be attributed to the density of stations in the network. Tidal oscillations are noticed at the GNSS stations. These oscillations have diurnal and semi-diurnal components. The diurnal components as seen from the ZTD are the principal source of the oscillations. This upshot may perhaps be ascribed to temporal variations in atmospheric water vapour on a diurnal scale. In addition, the diurnal ZTD cycles exhibited noteworthy seasonal dependence, with larger amplitudes in the rainy (wet) season and smaller ones in the harmattan (dry) season. Notably, the stations in the northern part of the country reach very high amplitudes in the months of June, July and August at the peak of the wet season, characterized by very high rainfall. This pinpoints the fact that in view of the small amount of atmospheric water vapour in the atmosphere, usually around 10%, its variations greatly influence the corresponding diurnal and seasonal discrepancies of ZTD. This study further affirms the prospective relevance of ground-based GNSS data to atmospheric studies. GNSS data analysis is therefore recommended as a tool for future exploration of Nigerian weather and climate.

  12. Enhancing Transparency and Control When Drawing Data-Driven Inferences About Individuals.

    PubMed

    Chen, Daizhuo; Fraiberger, Samuel P; Moakler, Robert; Provost, Foster

    2017-09-01

    Recent studies show the remarkable power of fine-grained information disclosed by users on social network sites to infer users' personal characteristics via predictive modeling. Similar fine-grained data are being used successfully in other commercial applications. In response, attention is turning increasingly to the transparency that organizations provide to users as to what inferences are drawn and why, as well as to what sort of control users can be given over inferences that are drawn about them. In this article, we focus on inferences about personal characteristics based on information disclosed by users' online actions. As a use case, we explore personal inferences that are made possible from "Likes" on Facebook. We first present a means for providing transparency into the information responsible for inferences drawn by data-driven models. We then introduce the "cloaking device"-a mechanism for users to inhibit the use of particular pieces of information in inference. Using these analytical tools we ask two main questions: (1) How much information must users cloak to significantly affect inferences about their personal traits? We find that usually users must cloak only a small portion of their actions to inhibit inference. We also find that, encouragingly, false-positive inferences are significantly easier to cloak than true-positive inferences. (2) Can firms change their modeling behavior to make cloaking more difficult? The answer is a definitive yes. We demonstrate a simple modeling change that requires users to cloak substantially more information to affect the inferences drawn. The upshot is that organizations can provide transparency and control even into complicated, predictive model-driven inferences, but they also can make control easier or harder for their users.

  13. Enhancing Transparency and Control When Drawing Data-Driven Inferences About Individuals

    PubMed Central

    Chen, Daizhuo; Fraiberger, Samuel P.; Moakler, Robert; Provost, Foster

    2017-01-01

    Abstract Recent studies show the remarkable power of fine-grained information disclosed by users on social network sites to infer users' personal characteristics via predictive modeling. Similar fine-grained data are being used successfully in other commercial applications. In response, attention is turning increasingly to the transparency that organizations provide to users as to what inferences are drawn and why, as well as to what sort of control users can be given over inferences that are drawn about them. In this article, we focus on inferences about personal characteristics based on information disclosed by users' online actions. As a use case, we explore personal inferences that are made possible from “Likes” on Facebook. We first present a means for providing transparency into the information responsible for inferences drawn by data-driven models. We then introduce the “cloaking device”—a mechanism for users to inhibit the use of particular pieces of information in inference. Using these analytical tools we ask two main questions: (1) How much information must users cloak to significantly affect inferences about their personal traits? We find that usually users must cloak only a small portion of their actions to inhibit inference. We also find that, encouragingly, false-positive inferences are significantly easier to cloak than true-positive inferences. (2) Can firms change their modeling behavior to make cloaking more difficult? The answer is a definitive yes. We demonstrate a simple modeling change that requires users to cloak substantially more information to affect the inferences drawn. The upshot is that organizations can provide transparency and control even into complicated, predictive model-driven inferences, but they also can make control easier or harder for their users. PMID:28933942

  14. Biocontrol in an impulsive predator-prey model.

    PubMed

    Terry, Alan J

    2014-10-01

    We study a model for biological pest control (or "biocontrol") in which a pest population is controlled by a program of periodic releases of a fixed yield of predators that prey on the pest. Releases are represented as impulsive increases in the predator population. Between releases, predator-pest dynamics evolve according to a predator-prey model with some fairly general properties: the pest population grows logistically in the absence of predation; the predator functional response is either of Beddington-DeAngelis type or Holling type II; the predator per capita birth rate is bounded above by a constant multiple of the predator functional response; and the predator per capita death rate is allowed to be decreasing in the predator functional response and increasing in the predator population, though the special case in which it is constant is permitted too. We prove that, when the predator functional response is of Beddington-DeAngelis type and the predators are not sufficiently voracious, then the biocontrol program will fail to reduce the pest population below a particular economic threshold, regardless of the frequency or yield of the releases. We prove also that our model possesses a pest-eradication solution, which is both locally and globally stable provided that predators are sufficiently voracious and that releases occur sufficiently often. We establish, curiously, that the pest-eradication solution can be locally stable whilst not being globally stable, the upshot of which is that, if we delay a biocontrol response to a new pest invasion, then this can change the outcome of the response from pest eradication to pest persistence. Finally, we state a number of specific examples for our model, and, for one of these examples, we corroborate parts of our analysis by numerical simulations. Copyright © 2014 Elsevier Inc. All rights reserved.

  15. Promising upshot of silver nanoparticles primed from Gracilaria crassa against bacterial pathogens.

    PubMed

    Lavakumar, V; Masilamani, K; Ravichandiran, V; Venkateshan, N; Saigopal, D V R; Ashok Kumar, C K; Sowmya, C

    2015-01-01

    The study on newer antimicrobial agent from metal based nano materials has augmented in recent years for the management of multidrug resistance microorganisms. In our present investigation, we synthesized silver nanoparticles (AgNP's) from red algae, Gracilaria crassa as beginning material which effectively condensed the silver ions to silver nanoparticles with less price tag and no risk. Silver nanoparticles were prepared by simple reaction of 1 mM AgNO3 with G. crassa extracts at room temperature. The fabricated AgNP's were subjected for characterization and screened against various microorganisms for antibacterial activity. UV-Vis spectroscopy (200-800 nm), XRD, FESEM and EDAX, were performed for AgNP's. UV-Vis spectroscopy demonstrated the absorption edge at 443 nm and EDAX pattern is purely due to the particle size and face centered cubic (fcc) symmetry of nanoparticles. Average size lays at 122.7 nm and zeta potential was found to be -34.9 mV. The antibacterial outcome of synthesized AgNP's (at the dose of 20 and 40 µg/ml) was evaluated against Escherichia coli, Proteus mirabilis, Bacillus subtilis and Pseudomonas aeruginosa. The mechanism of synthesized AgNP's bactericidal bustle is discussed in terms of interaction with the cell membrane of bacteria. The activity was found to be sky-scraping in a dose dependent manner. Thus, environmental friendly, cost effective, non hazardous stable nanoparticles were prepared by green synthesis using red algae, G. crassa. Synthesized G. crassa AgNP's were in acceptable size and shape. Further, it elicits better bactericidal activity against microorganism. This will assure the out put of superior antibacterial formulation for near future.

  16. The influence of theory on the formation of the infirmary during antiquity and the Middle Ages in the West

    PubMed Central

    Drampalos, Efstathios; Stogiannos, Vasileios; Psyllakis, Panagiotis; Sadiq, Mohammad; Michos, Ioannis

    2014-01-01

    The modern infirmary is the evolutional product of the dialectic interface between medical theories at each time and the outcome of their application in clinical practice. The infirmary as we know it today did not exist during antiquity, but the different precursors of the modern hospital emerged as a result of the interaction between medical theory and practice. During antiquity the Hippocratic work decisively contributed to the creation of the Asklipieion, an institution with predetermined structure created to heal diseases. Later in antiquity new types of infirmaries appeared along with the evolution of private practice for physicians. Establishment of the first modern hospitals was an outstanding contribution of Islamic medicine during reign of the Islamic Empire. Although there was little progress in the development of medical theory in medieval West, evolution of the infirmary continued and was mostly influenced by Christian religion and charity. In Constantinople large medieval infirmaries were built, but patient care was frequently offered in monasteries by clergymen. Later on medicine and treatment of diseases were taken over by physicians and taught in universities, and medical theory continued on its course of evolution. It is obvious that the modern infirmary is not only a place for treating diseases, but rather the upshot of a series of advancements in science, the relations between people or even countries, and the way humanity perceives its nature and the future. Our research is focused on the interactive relationship between the evolution of medical theory and the infirmary as an institution during antiquity and the Middle Ages with particular emphasis on the Western World. PMID:26587201

  17. Furthering the sceptical case against virtue ethics in nursing ethics.

    PubMed

    Holland, Stephen

    2012-10-01

    In a recent article in this journal I presented a sceptical argument about the current prominence of virtue ethics in nursing ethics. Daniel Putman has responded with a defence of the relevance of virtue in nursing. The present article continues this discussion by clarifying, defending, and expanding the sceptical argument. I start by emphasizing some features of the sceptical case, including assumptions about the nature of sceptical arguments, and about the character of both virtue ethics and nursing ethics. Then I respond to objections of Putman's such as that, according to virtue ethics, virtue is relevant to the whole of a human life, including one's behaviour in a professional context; and that eudaimonia should be central in explaining and motivating a nurse's decision to enter the profession. Having argued that these objections are not compelling, I go on to discuss an interesting recent attempt to reassert the role of virtue ethics in the ethics of professions, including nursing. This centres on whether role-specific obligations - e.g. the obligations that arise for a moral agent qua lawyer or mother - can be accommodated in a virtue ethics approach. Sean Cordell has argued that the difficulty of accommodating role-specific obligations results in an 'institution-shaped gap' in virtue ethics. He suggests a way of meeting this difficulty that appeals to the ergon of institutions. I endorse the negative point that role-specific obligations elude virtue ethics, but argue that the appeal to the ergon of institutions is unsuccessful. The upshot is further support for scepticism about the virtue ethics approach to nursing ethics. I end by gesturing to some of the advantages of a sceptical view of virtue ethics in nursing ethics. © 2012 Blackwell Publishing Ltd.

  18. Development and pilot testing of an educational intervention for parents, caregivers and teachers of children with verbal communication disabilities in Mexico.

    PubMed

    Parada-Toro, Irene; Gómez-Quiroz, Rosa M; Treviño-Siller, Sandra

    2017-03-01

    The purpose of this study was to implement and test an educational intervention aimed at training parents/caregivers and teachers in strategies to support children with verbal communication disabilities (VCDs). We carried out a descriptive observational research conducted in two phases during 2013-2014: a mixed-method diagnosis and intervention development. We used convenience sampling to select the parents/caregivers and teachers of first-to-third graders with VCDs across four public elementary schools in a suburban community in central Mexico. Diagnosis was based on questionnaires conducted with parents/caregivers (n = 38) and teachers (n = 16). The instruments focused not only on the respondents' socioeconomic characteristics and general knowledge about VCDs but also included open questions (24/42) about their common practices and support for children with VCDs. The intervention was built on data collected through the questionnaires, and was designed according to the Integral Intervention Model framework based on the ecosystemic approach. Participants were parents/caregivers and teachers of children with VCDs. Main results showed that the participants were trained in various support techniques, they gained knowledge about VCDs and changed their perception of their own ability to help children with language impairments. As an important upshot of the intervention, communication and networking among parents/caregivers and teachers increased. The main strengths of this research reside in its solid theoretical foundation and the fact that intervention design was based on the specific needs of the target group. In as much as the public health problem of VCDs in Mexico has barely been studied and has received minimal official support, it is essential to engage additional social actors, stakeholders and decision-makers in the implementation of permanent actions. Our study emphasises the importance of recognising this form of health impairment as a social responsibility and not as an individual family problem. © 2016 John Wiley & Sons Ltd.

  19. Energy spectra of massive two-body decay products and mass measurement

    DOE PAGES

    Agashe, Kaustubh; Franceschini, Roberto; Hong, Sungwoo; ...

    2016-04-26

    Here, we have recently established a new method for measuring the mass of unstable particles produced at hadron colliders based on the analysis of the energy distribution of a massless product from their two-body decays. The central ingredient of our proposal is the remarkable result that, for an unpolarized decaying particle, the location of the peak in the energy distribution of the observed decay product is identical to the (fixed) value of the energy that this particle would have in the rest-frame of the decaying particle, which, in turn, is a simple function of the involved masses. In addition, wemore » utilized the property that this energy distribution is symmetric around the location of peak when energy is plotted on a logarithmic scale. The general strategy was demonstrated in several specific cases, including both beyond the standard model particles, as well as for the top quark. In the present work, we generalize this method to the case of a massive decay product from a two-body decay; this procedure is far from trivial because (in general) both the above-mentioned properties are no longer valid. Nonetheless, we propose a suitably modified parametrization of the energy distribution that was used successfully for the massless case, which can deal with the massive case as well. We test this parametrization on concrete examples of energy spectra of Z bosons from the decay of a heavier supersymmetric partner of top quark (stop) into a Z boson and a lighter stop. After establishing the accuracy of this parametrization, we study a realistic application for the same process, but now including dominant backgrounds and using foreseeable statistics at LHC14, in order to determine the performance of this method for an actual mass measurement. The upshot of our present and previous work is that, in spite of energy being a Lorentz-variant quantity, its distribution emerges as a powerful tool for mass measurement at hadron colliders.« less

  20. Influence of exercise on bone remodeling-related hormones and cytokines in ovariectomized rats: a model of postmenopausal osteoporosis.

    PubMed

    Li, Lihui; Chen, Xi; Lv, Shuang; Dong, Miaomiao; Zhang, Li; Tu, Jiaheng; Yang, Jie; Zhang, Lingli; Song, Yinan; Xu, Leiting; Zou, Jun

    2014-01-01

    This study aims to explore the effects of exercise on postmenopausal osteoporosis and the mechanisms by which exercise affects bone remodeling. Sixty-three Wistar female rats were randomly divided into five groups: (1) control group, (2) sham-operated group, (3) OVX (Ovariectomy) group, (4) DES-OVX (Diethylstilbestrol-OVX) group, and (5) Ex-OVX (Exercise-OVX) group. The rat osteoporosis model was established through ovariectomy. The Ex-OVX rats were made to run 251.2 meters every day, 6 d/wk for 3 months in a running wheel. Trabecular bone volume (TBV%), total resorption surface (TRS%), trabecular formation surface (TFS%), mineralization rate (MAR), bone cortex mineralization rate (mAR), and osteoid seam width (OSW) were determined by bone histomorphometry. The mRNA and protein levels of interleukin-1β (IL-1β2), interleukin-6 (IL-6), and cyclooxygenase-2 (Cox-2) were determined by in situ hybridization and immunohistochemistry, respectively. Serum levels of estrogen estradiol (E2), calcitonin (CT), osteocalcin (BGP), and parathyroid hormone (PTH) were determined by ELISA assays. The investigation revealed that compared to the control and the sham-operated groups, the OVX group showed significantly lower levels of TBV%, E2, and CT, but much higher levels of TRS%, TFS%, MAR, OSW, BGP, and PTH. The Ex-OVX group showed increased TBV% and serum levels of E2 and CT compared to the OVX group. Ovariectomy also led to a significant increase in IL-1β mRNA and protein levels in the bone marrow and IL-6 and Cox-2 protein levels in tibias. In addition, the Ex-OVX group showed lower levels of IL-1 mRNA and protein, IL-6 mRNA, and Cox-2 mRNA and protein than those in the OVX group. The upshot of the study suggests that exercise can significantly increase bone mass in postmenopausal osteoporosis rat models by inhibiting bone resorption and increasing bone formation, especially in trabecular bones.

  1. Is the Critical Shields Stress for Incipient Sediment Motion Dependent on Bed Slope in Natural Channels? No.

    NASA Astrophysics Data System (ADS)

    Phillips, C. B.; Jerolmack, D. J.

    2017-12-01

    Understanding when coarse sediment begins to move in a river is essential for linking rivers to the evolution of mountainous landscapes. Unfortunately, the threshold of surface particle motion is notoriously difficult to measure in the field. However, recent studies have shown that the threshold of surface motion is empirically correlated with channel slope, a property that is easy to measure and readily available from the literature. These studies have thoroughly examined the mechanistic underpinnings behind the observed correlation and produced suitably complex models. These models are difficult to implement for natural rivers using widely available data, and thus others have treated the empirical regression between slope and the threshold of motion as a predictive model. We note that none of the authors of the original studies exploring this correlation suggested their empirical regressions be used in a predictive fashion, nevertheless these regressions between slope and the threshold of motion have found their way into numerous recent studies engendering potentially spurious conclusions. We demonstrate that there are two significant problems with using these empirical equations for prediction: (1) the empirical regressions are based on a limited sampling of the phase space of bed-load rivers and (2) the empirical measurements of bankfull and critical shear stresses are paired. The upshot of these problems limits the empirical relations predictive capacity to field sites drawn from the same region of the bed-load river phase space and that the paired nature of the data introduces a spurious correlation when considering the ratio of bankfull to critical shear stress. Using a large compilation of bed-load river hydraulic geometry data, we demonstrate that the variation within independently measured values of the threshold of motion changes systematically with bankfull shields stress and not channel slope. Additionally, we highlight using several recent datasets the potential pitfalls that one can encounter when using simplistic empirical regressions to predict the threshold of motion showing that while these concerns could be construed as subtle the resulting implications can be substantial.

  2. Saddle Slow Manifolds and Canard Orbits in [Formula: see text] and Application to the Full Hodgkin-Huxley Model.

    PubMed

    Hasan, Cris R; Krauskopf, Bernd; Osinga, Hinke M

    2018-04-19

    Many physiological phenomena have the property that some variables evolve much faster than others. For example, neuron models typically involve observable differences in time scales. The Hodgkin-Huxley model is well known for explaining the ionic mechanism that generates the action potential in the squid giant axon. Rubin and Wechselberger (Biol. Cybern. 97:5-32, 2007) nondimensionalized this model and obtained a singularly perturbed system with two fast, two slow variables, and an explicit time-scale ratio ε. The dynamics of this system are complex and feature periodic orbits with a series of action potentials separated by small-amplitude oscillations (SAOs); also referred to as mixed-mode oscillations (MMOs). The slow dynamics of this system are organized by two-dimensional locally invariant manifolds called slow manifolds which can be either attracting or of saddle type.In this paper, we introduce a general approach for computing two-dimensional saddle slow manifolds and their stable and unstable fast manifolds. We also develop a technique for detecting and continuing associated canard orbits, which arise from the interaction between attracting and saddle slow manifolds, and provide a mechanism for the organization of SAOs in [Formula: see text]. We first test our approach with an extended four-dimensional normal form of a folded node. Our results demonstrate that our computations give reliable approximations of slow manifolds and canard orbits of this model. Our computational approach is then utilized to investigate the role of saddle slow manifolds and associated canard orbits of the full Hodgkin-Huxley model in organizing MMOs and determining the firing rates of action potentials. For ε sufficiently large, canard orbits are arranged in pairs of twin canard orbits with the same number of SAOs. We illustrate how twin canard orbits partition the attracting slow manifold into a number of ribbons that play the role of sectors of rotations. The upshot is that we are able to unravel the geometry of slow manifolds and associated canard orbits without the need to reduce the model.

  3. Silibinin attenuates ionizing radiation-induced pro-angiogenic response and EMT in prostate cancer cells

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nambiar, Dhanya K.; School of Environmental Sciences, Jawaharlal Nehru University, New Delhi; Rajamani, Paulraj

    Graphical abstract: Potential model showing mechanism of silibinin-mediated attenuation of IR-induced angiogenic phenotype and EMT in tumor cells. Silibinin counters radiation induced invasive and migratory phenotype of cancer cells by down-regulating mitogenic pathways activated by IR, leading to inhibition of molecules including VEGF, iNOS, MMPs and N-cadherin. Silibinin also reverses IR mediated E-cadherin down-regulation, inhibiting EMT in tumor cells. Silibinin also radiosensitizes endothelial cells, reduces capillary tube formation by targeting various pro-angiogenic molecules. Further, silibinin may inhibit autocrine and paracrine signaling between tumor and endothelial cells by decreasing the levels of VEGF and other signaling molecules activated in response tomore » IR. - Highlights: • Silibinin radiosensitizes endothelial cells. • Silibinin targets ionization radiation (IR)-induced EMT in PCa cells. • Silibinin is in phase II clinical trial in PCa patients, hence clinically relevant. - Abstract: Radiotherapy of is well established and frequently utilized in prostate cancer (PCa) patients. However, recurrence following therapy and distant metastases are commonly encountered problems. Previous studies underline that, in addition to its therapeutic effects, ionizing radiation (IR) increases the vascularity and invasiveness of surviving radioresistant cancer cells. This invasive phenotype of radioresistant cells is an upshot of IR-induced pro-survival and mitogenic signaling in cancer as well as endothelial cells. Here, we demonstrate that a plant flavonoid, silibinin can radiosensitize endothelial cells by inhibiting expression of pro-angiogenic factors. Combining silibinin with IR not only strongly down-regulated endothelial cell proliferation, clonogenicity and tube formation ability rather it strongly (p < 0.001) reduced migratory and invasive properties of PCa cells which were otherwise marginally affected by IR treatment alone. Most of the pro-angiogenic (VEGF, iNOS), migratory (MMP-2) and EMT promoting proteins (uPA, vimentin, N-cadherin) were up-regulated by IR in PCa cells. Interestingly, all of these invasive and EMT promoting actions of IR were markedly decreased by silibinin. Further, we found that potentiated effect was an end result of attenuation of IR-activated mitogenic and pro-survival signaling, including Akt, Erk1/2 and STAT-3, by silibinin.« less

  4. Vibration upshot of operating mechanical sewing machine: an insight into common peroneal nerve conduction study.

    PubMed

    Yadav, Prakash Kumar; Yadav, Ram Lochan; Sharma, Deepak; Shah, Dev Kumar; Sapkota, Niraj Khatri; Thakur, Dilip; Limbu, Nirmala; Islam, Md Nazrul

    2017-01-01

    Most of the people associated with tailoring occupation in Nepal are still using mechanical sewing machine as an alternative of new technology for tailoring. Common peroneal nerves of both right and left legs are exposed to strenuous and chronic stress exerted by vibration and paddling of mechanical sewing machine. The study included 30 healthy male tailors and 30 healthy male individuals. Anthropometric variables as well as cardio respiratory variables were determined for each subject. Standard Nerve Conduction Techniques using constant measured distances were applied to evaluate common peroneal nerve (motor) in both legs of each individual. Data were analyzed and compared between study and control groups using Man Whitney U test setting the significance level p  ≤ 0.05. Anthropometric and cardio respiratory variables were not significantly altered between the study and control groups. The Compound muscle action potential (CMAP) latency of common peroneal nerves of both right [(11.29 ± 1.25 vs. 10.03 ± 1.37), P  < 0.001] and left [(11.28 ± 1.38 vs. 10.05 ± 1.37), P  < 0.01] legs was found to be significantly prolonged in study group as compared to control group. The Amp-CMAP of common peroneal nerves of both right [(4.57 ± 1.21 vs. 6.22 ± 1.72), P  < 0.001] and left [(4.31 ± 1.55 vs. 6.25 ± 1.70), P  < 0.001] legs was found significantly reduced in study group as compared to control group. Similarly, the motor nerve conduction velocity (MNCV) of common peroneal nerves of both right [(43.72 ± 3.25 vs. 47.49 ± 4.17), P  < 0.001] and left [(42.51 ± 3.82 vs. 46.76 ± 4.51), P  < 0.001] legs was also found to be significantly reduced in study group in comparison to control group. Operating mechanical sewing machine by paddling chronically and arduously could have attributed to abnormal nerve conduction study parameters due to vibration effect of the machine on right and left common peroneal nerves. The results of present study follow the trend towards presymptomatic or asymptomatic neuropathy similar to subclinical neuropathy.

  5. Large reservoirs: Chapter 17

    USGS Publications Warehouse

    Miranda, Leandro E.; Bettoli, Phillip William

    2010-01-01

    Large impoundments, defined as those with surface area of 200 ha or greater, are relatively new aquatic ecosystems in the global landscape. They represent important economic and environmental resources that provide benefits such as flood control, hydropower generation, navigation, water supply, commercial and recreational fisheries, and various other recreational and esthetic values. Construction of large impoundments was initially driven by economic needs, and ecological consequences received little consideration. However, in recent decades environmental issues have come to the forefront. In the closing decades of the 20th century societal values began to shift, especially in the developed world. Society is no longer willing to accept environmental damage as an inevitable consequence of human development, and it is now recognized that continued environmental degradation is unsustainable. Consequently, construction of large reservoirs has virtually stopped in North America. Nevertheless, in other parts of the world construction of large reservoirs continues. The emergence of systematic reservoir management in the early 20th century was guided by concepts developed for natural lakes (Miranda 1996). However, we now recognize that reservoirs are different and that reservoirs are not independent aquatic systems inasmuch as they are connected to upstream rivers and streams, the downstream river, other reservoirs in the basin, and the watershed. Reservoir systems exhibit longitudinal patterns both within and among reservoirs. Reservoirs are typically arranged sequentially as elements of an interacting network, filter water collected throughout their watersheds, and form a mosaic of predictable patterns. Traditional approaches to fisheries management such as stocking, regulating harvest, and in-lake habitat management do not always produce desired effects in reservoirs. As a result, managers may expend resources with little benefit to either fish or fishing. Some locally expressed effects, such as turbidity and water quality, zooplankton density and size composition, or fish growth rates and assemblage composition, are the upshot of large-scale factors operating outside reservoirs and not under the direct control of reservoir managers. Realistically, abiotic and biotic conditions in reservoirs are shaped by factors working inside and outside reservoirs, with the relative importance of external factors differing among reservoirs. With this perspective, large reservoirs are viewed from a habitat standpoint within the framework of a conceptual model in which individual reservoir characteristics are influenced by both local- and landscape-scale factors (Figure 17.1). In the sections that follow, how each element of this hierarchical model influences habitat and fish assemblages in reservoirs is considered. Important in-reservoir habitat issues and reservoirs as part of larger systems, where reservoir management requires looking for real solutions outside individual reservoirs are described.

  6. Researchers' experience with project management in health and medical research: Results from a post-project review

    PubMed Central

    2011-01-01

    Background Project management is widely used to deliver projects on time, within budget and of defined quality. However, there is little published information describing its use in managing health and medical research projects. We used project management in the Alcohol and Pregnancy Project (2006-2008) http://www.ichr.uwa.edu.au/alcoholandpregnancy and in this paper report researchers' opinions on project management and whether it made a difference to the project. Methods A national interdisciplinary group of 20 researchers, one of whom was the project manager, formed the Steering Committee for the project. We used project management to ensure project outputs and outcomes were achieved and all aspects of the project were planned, implemented, monitored and controlled. Sixteen of the researchers were asked to complete a self administered questionnaire for a post-project review. Results The project was delivered according to the project protocol within the allocated budget and time frame. Fifteen researchers (93.8%) completed a questionnaire. They reported that project management increased the effectiveness of the project, communication, teamwork, and application of the interdisciplinary group of researchers' expertise. They would recommend this type of project management for future projects. Conclusions Our post-project review showed that researchers comprehensively endorsed project management in the Alcohol and Pregnancy Project and agreed that project management had contributed substantially to the research. In future, we will project manage new projects and conduct post-project reviews. The results will be used to encourage continuous learning and continuous improvement of project management, and provide greater transparency and accountability of health and medical research. The use of project management can benefit both management and scientific outcomes of health and medical research projects. PMID:21635721

  7. 75 FR 9004 - Sunshine Act; Board of Directors Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-26

    ... TO BE CONSIDERED: (Closed to the Public 9:45 a.m.) 1. Finance Project--Turkey. 2. Finance Project--Ghana. 3. Finance Project--Panama. 4. Finance Project--Russia. 5. Finance Project--Jordan. 6. Finance Project--Afghanistan. 7. Finance Project--Afghanistan. 8. Finance Project--Iraq. 9. Finance Project--OPIC...

  8. The CHPRC Columbia River Protection Project Quality Assurance Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fix, N. J.

    Pacific Northwest National Laboratory researchers are working on the CHPRC Columbia River Protection Project (hereafter referred to as the Columbia River Project). This is a follow-on project, funded by CH2M Hill Plateau Remediation Company, LLC (CHPRC), to the Fluor Hanford, Inc. Columbia River Protection Project. The work scope consists of a number of CHPRC funded, related projects that are managed under a master project (project number 55109). All contract releases associated with the Fluor Hanford Columbia River Project (Fluor Hanford, Inc. Contract 27647) and the CHPRC Columbia River Project (Contract 36402) will be collected under this master project. Each projectmore » within the master project is authorized by a CHPRC contract release that contains the project-specific statement of work. This Quality Assurance Project Plan provides the quality assurance requirements and processes that will be followed by the Columbia River Project staff.« less

  9. Optimum Projection Angle for Attaining Maximum Distance in a Soccer Punt Kick

    PubMed Central

    Linthorne, Nicholas P.; Patel, Dipesh S.

    2011-01-01

    To produce the greatest horizontal distance in a punt kick the ball must be projected at an appropriate angle. Here, we investigated the optimum projection angle that maximises the distance attained in a punt kick by a soccer goalkeeper. Two male players performed many maximum-effort kicks using projection angles of between 10° and 90°. The kicks were recorded by a video camera at 100 Hz and a 2 D biomechanical analysis was conducted to obtain measures of the projection velocity, projection angle, projection height, ball spin rate, and foot velocity at impact. The player’s optimum projection angle was calculated by substituting mathematical equations for the relationships between the projection variables into the equations for the aerodynamic flight of a soccer ball. The calculated optimum projection angles were in agreement with the player’s preferred projection angles (40° and 44°). In projectile sports even a small dependence of projection velocity on projection angle is sufficient to produce a substantial shift in the optimum projection angle away from 45°. In the punt kicks studied here, the optimum projection angle was close to 45° because the projection velocity of the ball remained almost constant across all projection angles. This result is in contrast to throwing and jumping for maximum distance, where the projection velocity the athlete is able to achieve decreases substantially with increasing projection angle and so the optimum projection angle is well below 45°. Key points The optimum projection angle that maximizes the distance of a punt kick by a soccer goalkeeper is about 45°. The optimum projection angle is close to 45° because the projection velocity of the ball is almost the same at all projection angles. This result is in contrast to throwing and jumping for maximum distance, where the optimum projection angle is well below 45° because the projection velocity the athlete is able to achieve decreases substantially with increasing projection angle. PMID:24149315

  10. 77 FR 31676 - Sunshine Act Meeting Notice-June 14, 2012 Board of Directors Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-29

    ... a.m.): 1. Finance Project--Kenya, Tanzania and East Africa. 2. Finance Project--Peru. 3. Finance Project--Jordan. 4. Finance Project--Botswana. 5. Finance Project--South Africa. 6. Finance Project--Central/Eastern Europe. 7. Finance Project--Brazil. 8. Finance Project--Sub-Saharan Africa. 9. Finance...

  11. Examination of the relationship between project management critical success factors and project success of oil and gas drilling projects

    NASA Astrophysics Data System (ADS)

    Alagba, Tonye J.

    Oil and gas drilling projects are the primary means by which oil companies recover large volumes of commercially available hydrocarbons from deep reservoirs. These types of projects are complex in nature, involving management of multiple stakeholder interfaces, multidisciplinary personnel, complex contractor relationships, and turbulent environmental and market conditions, necessitating the application of proven project management best practices and critical success factors (CSFs) to achieve success. Although there is some practitioner oriented literature on project management CSFs for drilling projects, none of these is based on empirical evidence, from research. In addition, the literature has reported alarming rates of oil and gas drilling project failure, which is attributable not to technical factors, but to failure of project management. The aim of this quantitative correlational study therefore, was to discover an empirically verified list of project management CSFs, which consistent application leads to successful implementation of oil and gas drilling projects. The study collected survey data online, from a random sample of 127 oil and gas drilling personnel who were members of LinkedIn's online community "Drilling Supervisors, Managers, and Engineers". The results of the study indicated that 10 project management factors are individually related to project success of oil and gas drilling projects. These 10 CSFs are namely; Project mission, Top management support, Project schedule/plan, Client consultation, Personnel, Technical tasks, Client acceptance, Monitoring and feedback, Communication, and Troubleshooting. In addition, the study found that the relationships between the 10 CSFs and drilling project success is unaffected by participant and project demographics---role of project personnel, and project location. The significance of these findings are both practical, and theoretical. Practically, application of an empirically verified CSFs list to oil and gas drilling projects could help oil companies improve the performance of future drilling projects. Theoretically, the study's findings may help to bridge a gap in the project management CSFs literature, and add to the general project management body of knowledge.

  12. A Qualitative Study of the Relationship between a Banking IT Troubled Project and the Executive Project Sponsor's Project Management Maturity Level

    ERIC Educational Resources Information Center

    Northcraft, Terry G.

    2017-01-01

    This qualitative study examined the effect the level of project management maturity a banking IT project sponsor has on project success. Project management maturity is gauged by the amount of modern project management training, knowledge and organizational skills an individual or organization has and applies to their project lifecycle experiences.…

  13. 32 CFR Appendix to Part 162 - Reporting Procedures

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... generated. e. Projected Life-Cycle Savings. For each PIF project provide the estimated amount of savings the project is projected to earn over the project's economic life. f. Projected Life-Cycle Cost Avoidance. For... Projected Life-Cycle Savings. e. Total Projected Life-Cycle Cost Avoidance. 3. CSI. Each DoD Component that...

  14. A Quantitative Examination of Critical Success Factors Comparing Agile and Waterfall Project Management Methodologies

    ERIC Educational Resources Information Center

    Pedersen, Mitra

    2013-01-01

    This study investigated the rate of success for IT projects using agile and standard project management methodologies. Any successful project requires use of project methodology. Specifically, large projects require formal project management methodologies or models, which establish a blueprint of processes and project planning activities. This…

  15. Environmental Science: 49 Science Fair Projects. Science Fair Projects Series.

    ERIC Educational Resources Information Center

    Bonnet, Robert L.; Keen, G. Daniel

    This book contains 49 science fair projects designed for 6th to 9th grade students. Projects are organized by the topics of soil, ecology (projects in habitat and life cycles), pests and controls (projects in weeds and insects), recycling (projects in resources and conservation), waste products (projects in decomposition), microscopic organisms,…

  16. Application fuzzy multi-attribute decision analysis method to prioritize project success criteria

    NASA Astrophysics Data System (ADS)

    Phong, Nguyen Thanh; Quyen, Nguyen Le Hoang Thuy To

    2017-11-01

    Project success is a foundation for project owner to manage and control not only for the current project but also for future potential projects in construction companies. However, identifying the key success criteria for evaluating a particular project in real practice is a challenging task. Normally, it depends on a lot of factors, such as the expectation of the project owner and stakeholders, triple constraints of the project (cost, time, quality), and company's mission, vision, and objectives. Traditional decision-making methods for measuring the project success are usually based on subjective opinions of panel experts, resulting in irrational and inappropriate decisions. Therefore, this paper introduces a multi-attribute decision analysis method (MADAM) for weighting project success criteria by using fuzzy Analytical Hierarchy Process approach. It is found that this method is useful when dealing with imprecise and uncertain human judgments in evaluating project success criteria. Moreover, this research also suggests that although cost, time, and quality are three project success criteria projects, the satisfaction of project owner and acceptance of project stakeholders with the completed project criteria is the most important criteria for project success evaluation in Vietnam.

  17. The Project Manager Who Saved His Country

    NASA Technical Reports Server (NTRS)

    Baniszewski, John

    2008-01-01

    George Meade defeated Robert E. Lee, one of the greatest military leaders of all time. How did he do it? By using the skills he had learned as a project manager and outperforming Lee in all aspects of project management. Most project managers are familiar with the Project Management Institute's "Guide to the Project Management Body of Knowledge" (PMBOK), which identifies the skills and knowledge crucial to successful project management. Project managers need to make sure that all the elements of a project work together. They must develop and execute plans and coordinate changes to those plans. A project manager must define the scope of the work, break it into manageable pieces, verify and control what work is being done, and make sure that the work being done is essential to the project. Every project manager knows the challenges of schedule and the value of schedule slack. Project managers must get the resources they need and use them effectively. Project managers get the people they need and use their talents to achieve mission success. Projects generate huge amounts of information. A key to project success is getting sufficient and accurate information to the people who need it when they need it. Project managers must identify and quantify the risks that jeopardize project success and make plans for dealing with them. Studying Meade and Lee's performances at Gettysburg can help modern project managers appreciate, develop, and use the skills they need to be good project managers. The circumstances may be different, but the basic principles are the same. This dramatic event in American history shows how the skills of project management can be used in almost any situation. Former project manager George Meade used those skills to change the tide of the Civil War.

  18. Cooperative Projects - Challenges and Opportunities

    NASA Astrophysics Data System (ADS)

    Schubotz, Wiebke; Brücher, Tim; Vamborg, Freja

    2017-04-01

    Today's research in Germany is often organized in large projects and collaborations, so-called cooperative projects ("Verbundprojekte" in German). These projects are defined by a large number of members (more than 50) and participating institutes, e.g. institutes of research organizations such as the Max-Planck society and the Leibniz association, Helmholtz centres, and universities. For coordination purposes these projects usually have a general project manager or project coordinator close to the speaker of the project. Despite this overarching position, it is often challenging for the project manager to really overview the entire project as he is, for example, not involved in the individual institute's recruitment processes or research connections to other institutes via other projects. Additionally, there is neither a formal obligation for the principal investigators and project scientists to report changes within their sub-projects, nor any formal dependency between these sub-projects and the coordination office to ensure a contemporary update of changes and progress in their specific tasks of the project. Therefore, the idea of a coordinating position to oversee the entire cooperative project is sometimes difficult to reach. Furthermore, project managers usually have no formal connection to other project managers. This means that recurrent tasks, for which cooperation between project managers would be helpful, need to be reinvented for each project anew. Due to the lack of this more formalized cooperation between project managers, acquired expertise is often lost. We will illustrate the challenges of this kind of project management based on projects at the Max Planck Institute for Meteorology (Hamburg) and the Helmholtz Centre for Ocean Research (GEOMAR, Kiel), but also point out opportunities that arise within a large collaboration of partners. Moreover, we present an approach to coordinate management processes in order to overcome some of the aforementioned challenges across several cooperative projects - a virtual centre for earth system science management (CESSMA).

  19. 77 FR 10739 - SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14298-000, Project No. 14299-000, Project No. 14301-000] SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice... Project No. 14299-000, and FFP Project 99, LLC for Project No. 14301-000.\\2\\ \\1\\ Under the Commission's...

  20. A Statistical Project Control Tool for Engineering Managers

    NASA Technical Reports Server (NTRS)

    Bauch, Garland T.

    2001-01-01

    This slide presentation reviews the use of a Statistical Project Control Tool (SPCT) for managing engineering projects. A literature review pointed to a definition of project success, (i.e., A project is successful when the cost, schedule, technical performance, and quality satisfy the customer.) The literature review also pointed to project success factors, and traditional project control tools, and performance measures that are detailed in the report. The essential problem is that with resources becoming more limited, and an increasing number or projects, project failure is increasing, there is a limitation of existing methods and systematic methods are required. The objective of the work is to provide a new statistical project control tool for project managers. Graphs using the SPCT method plotting results of 3 successful projects and 3 failed projects are reviewed, with success and failure being defined by the owner.

  1. Improving Project Management with Simulation and Completion Distribution Functions

    NASA Technical Reports Server (NTRS)

    Cates, Grant R.

    2004-01-01

    Despite the critical importance of project completion timeliness, management practices in place today remain inadequate for addressing the persistent problem of project completion tardiness. A major culprit in late projects is uncertainty, which most, if not all, projects are inherently subject to. This uncertainty resides in the estimates for activity durations, the occurrence of unplanned and unforeseen events, and the availability of critical resources. In response to this problem, this research developed a comprehensive simulation based methodology for conducting quantitative project completion time risk analysis. It is called the Project Assessment by Simulation Technique (PAST). This new tool enables project stakeholders to visualize uncertainty or risk, i.e. the likelihood of their project completing late and the magnitude of the lateness, by providing them with a completion time distribution function of their projects. Discrete event simulation is used within PAST to determine the completion distribution function for the project of interest. The simulation is populated with both deterministic and stochastic elements. The deterministic inputs include planned project activities, precedence requirements, and resource requirements. The stochastic inputs include activity duration growth distributions, probabilities for events that can impact the project, and other dynamic constraints that may be placed upon project activities and milestones. These stochastic inputs are based upon past data from similar projects. The time for an entity to complete the simulation network, subject to both the deterministic and stochastic factors, represents the time to complete the project. Repeating the simulation hundreds or thousands of times allows one to create the project completion distribution function. The Project Assessment by Simulation Technique was demonstrated to be effective for the on-going NASA project to assemble the International Space Station. Approximately $500 million per month is being spent on this project, which is scheduled to complete by 2010. NASA project stakeholders participated in determining and managing completion distribution functions produced from PAST. The first result was that project stakeholders improved project completion risk awareness. Secondly, using PAST, mitigation options were analyzed to improve project completion performance and reduce total project cost.

  2. Dissemination and Exploitation: Project Goals beyond Science

    NASA Astrophysics Data System (ADS)

    Hamann, Kristin; Reitz, Anja

    2017-04-01

    Dissemination and Exploitation are essential parts of public funded projects. In Horizon 2020 a plan for the exploitation and dissemination of results (PEDR) is a requirement. The plan should contain a clear vision on the objectives of the project in relation to actions for dissemination and potential exploitation of the project results. The actions follow the basic idea to spread the knowledge and results gathered within the project and face the challenge of how to bring the results into potentially relevant policy circle and how they impact the market. The plan follows the purpose to assess the impact of the project and to address various target groups who are interested in the project results. Simply put, dissemination concentrates on the transfer of knowledge and exploitation on the commercialization of the project. Beyond the question of the measurability of project`s impact, strategies within science marketing can serve purposes beyond internal and external communication. Accordingly, project managers are facing the challenge to implement a dissemination and exploitation strategy that ideally supports the identification of all partners with the project and matches the current discourse of the project`s content within the society, politics and economy. A consolidated plan might unite all projects partners under a central idea and supports the identification with the project beyond the individual research questions. Which applications, strategies and methods can be used to bring forward a PEDR that accompanies a project successfully and allows a comprehensive assessment of the project afterwards? Which hurdles might project managers experience in the dissemination process and which tasks should be fulfilled by the project manager?

  3. Success in large high-technology projects: What really works?

    NASA Astrophysics Data System (ADS)

    Crosby, P.

    2014-08-01

    Despite a plethora of tools, technologies and management systems, successful execution of big science and engineering projects remains problematic. The sheer scale of globally funded projects such as the Large Hadron Collider and the Square Kilometre Array telescope means that lack of project success can impact both on national budgets, and collaborative reputations. In this paper, I explore data from contemporary literature alongside field research from several current high-technology projects in Europe and Australia, and reveal common `pressure points' that are shown to be key influencers of project control and success. I discuss the how mega-science projects sit between being merely complicated, and chaotic, and explain the importance of understanding multiple dimensions of project complexity. Project manager/leader traits are briefly discussed, including capability to govern and control such enterprises. Project structures are examined, including the challenge of collaborations. I show that early attention to building project resilience, curbing optimism, and risk alertness can help prepare large high-tech projects against threats, and why project managers need to understand aspects of `the silent power of time'. Mission assurance is advanced as a critical success function, alongside the deployment of task forces and new combinations of contingency plans. I argue for increased project control through industrial-style project reviews, and show how post-project reviews are an under-used, yet invaluable avenue of personal and organisational improvement. Lastly, I discuss the avoidance of project amnesia through effective capture of project knowledge, and transfer of lessons-learned to subsequent programs and projects.

  4. A multilevel study of the impact of project manager's leadership on extra-role performance of project team members

    NASA Astrophysics Data System (ADS)

    Shokory, Suzyanty Mohd; Suradi, Nur Riza Mohd

    2018-04-01

    The current study examines the impact of transformational and transactional leadership of project manager on the extra-role performance of project team members. In addition, this study also identifies factor dominant to extra-role performance of project team members when the transformational and transactional leadership of project managers are analyzed simultaneously. The study involved 175 of project team members from 35 project teams (each project team consists of different contracting companies registered in the Selangor (N = 175 from 35 contractors company). A multilevel analysis with hierarchical linear modeling (HLM) approach was used in this study. The analysis showed that transformational and transactional leadership of the project manager is a positive significant with extra-role performance project team members when analyzed separately. However when the two constructs (transformational leadership and transactional leadership of project manager) were analyzed simultaneously, transformational leadership was found to have more impact on extra-role performance project team members compared to transactional leadership. These findings explained that although transformational and transactional leadership of project managers can improve extra-role performance project team members, but this study has proved that transformational leadership of project managers affect extra-role performance project team members more as compared to transactional leadership.

  5. Concentrating Solar Power Projects - Power Tower Projects | Concentrating

    Science.gov Websites

    (CSP) projects that use power tower systems are listed below-alphabetically by project name. You can browse a project profile by clicking on the project name. You can also find related information on power Aurora Solar Energy Project Copiapó Crescent Dunes Solar Energy Project (Tonopah) Dahan Power Plant DEWA

  6. Project management of life-science research projects: project characteristics, challenges and training needs.

    PubMed

    Beukers, Margot W

    2011-02-01

    Thirty-four project managers of life-science research projects were interviewed to investigate the characteristics of their projects, the challenges they faced and their training requirements. A set of ten discriminating parameters were identified based on four project categories: contract research, development, discovery and call-based projects--projects set up to address research questions defined in a call for proposals. The major challenges these project managers are faced with relate to project members, leadership without authority and a lack of commitment from the respective organization. Two-thirds of the project managers indicated that they would be interested in receiving additional training, mostly on people-oriented, soft skills. The training programs that are currently on offer, however, do not meet their needs. Copyright © 2010 Elsevier Ltd. All rights reserved.

  7. Guidelines for Project Management

    NASA Technical Reports Server (NTRS)

    Ben-Arieh, David

    2001-01-01

    Project management is an important part of the professional activities at Kennedy Space Center (KSC). Project management is the means by which many of the operations at KSC take shape. Moreover, projects at KSC are implemented in a variety of ways in different organizations. The official guidelines for project management are provided by NASA headquarters and are quite general. The project reported herein deals with developing practical and detailed project management guidelines in support of the project managers. This report summarizes the current project management effort in the Process Management Division and presents a new modeling approach of project management developed by the author. The report also presents the Project Management Guidelines developed during the summer.

  8. How Project Managers Really Manage: An Indepth Look at Some Managers of Large, Complex NASA Projects

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Impaeilla, Cliff (Technical Monitor)

    2000-01-01

    This paper reports on a research study by the author that examined ten contemporary National Aeronautics and Space Administration (NASA) complex projects. In-depth interviews with the project managers of these projects provided qualitative data about the inner workings of the project and the methodologies used in establishing and managing the projects. The inclusion of a variety of space, aeronautics, and ground based projects from several different NASA research centers helped to reduce potential bias in the findings toward any one type of project, or technical discipline. The findings address the participants and their individual approaches. The discussion includes possible implications for project managers of other large, complex, projects.

  9. An Approach for Implementation of Project Management Information Systems

    NASA Astrophysics Data System (ADS)

    Běrziša, Solvita; Grabis, Jānis

    Project management is governed by project management methodologies, standards, and other regulatory requirements. This chapter proposes an approach for implementing and configuring project management information systems according to requirements defined by these methodologies. The approach uses a project management specification framework to describe project management methodologies in a standardized manner. This specification is used to automatically configure the project management information system by applying appropriate transformation mechanisms. Development of the standardized framework is based on analysis of typical project management concepts and process and existing XML-based representations of project management. A demonstration example of project management information system's configuration is provided.

  10. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Eligible projects. 810.302 Section 810.302 Highways... SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  11. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Eligible projects. 810.302 Section 810.302 Highways... SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  12. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Eligible projects. 810.302 Section 810.302 Highways... SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  13. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Eligible projects. 810.302 Section 810.302 Highways... SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  14. [Analysis of funding of projects on obstetrics and gynecology supported by National Natural Science Foundation of China from 2007 to 2016].

    PubMed

    Qin, S H; Huang, Q S; Yao, S Z

    2017-04-25

    Objective: To summarize the funding of scientific research projects on obstetrics and gynecology by National Natural Science Foundation of China (NSFC) from 2007 to 2016 and to display the hotspots of scientific research on obstetrics and gynecology. Methods: A systemic search was performed for the information of projects supported by NSFC from 2007 to 2016. The indicators for analysis included the number of projects, total investment, project categories, research units and research field. The research direction of each project was decided based on title, summary and key words provided by the profile of each project. Results: The total investment on obstetrics and gynecology by NSFC was 23.214 million with a total of 82 projects in 2007. It increased year by year and reached the peak in 2014 (359 projects 208.990 million). The investment and number of projects remained stable after 2014. General projects (1 109 projects 608.000 million) formed the majority of projects. Youth science fund projects (1 035 projects 214.976 million) increased steadily and the number was nearly equal to general projects. There were only a small amount of key projects (20 projects 54.720 million) and major projects (7 projects 38.400 million). The investment varied in different research units. The greatest 10 units (less than 6% of total), including 7 comprehensive universities, 2 medical universities and 1 institute of medicine, got 1 113 projects invested (43.84% of total, 1 113/2 539). The hot areas like gynecological tumor (920 projects 350.615 million), hypertensive disorders complicating pregnancy (91 projects 37.470 million) and polycystic ovarian syndrome (77 projects 29.540 million) were more likely to receive investment, while some interdisciplinary science like maternal and child health (28 projects 12.050 million), imaging and biomedicine (37 projects 14.770 million) began to achieve attention in recent years. Conclusions: The number of researches invested will be increased for the scientific research in obstetrics and gynecology especially the areas of research focus, although the amount allocated for each will be decreased relatively. Besides, multidisciplinary work will be performed so as to develop obstetrics and gynecology of China to a high level.

  15. Workplace Factors That Shape Information Technology Project Success

    ERIC Educational Resources Information Center

    Nguyen, Dan Schilling

    2013-01-01

    Information technology (IT) project success depends on having a project manager with effective decision making, leadership, and project management skills. Project success also depends on completing the project in a given budget, time, and scope. Despite these critical qualities of a successful project manager, little research has explored the…

  16. 77 FR 52766 - Sunshine Act; Board of Directors Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    .... FURTHER MATTERS TO BE CONSIDERED (Closed to the Public 10 a.m.): 1. Finance Project--Jordan. 2. Finance Project--South Africa. 3. Finance Project--Turkey. 4. Insurance Project--Ghana. 5. Insurance Project--Egypt, Jordan and Pakistan. 6. Insurance Project--Ghana. 7. Finance Project--Pan-Africa. 8. Finance...

  17. 76 FR 34277 - Sunshine Act; Board of Directors Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-13

    ... Public 10:15 a.m.). 1. Reports. 2. Finance Project--Egypt and Jordan. 3. Finance Project--Global. 4. Finance Project--Global. 5. Finance Project--India and Southeast Asia. 6. Finance Project--India, Philippines, Sri Lanka and Southeast Asia. 7. Finance Project--Vietnam, Cambodia and Laos. 8. Finance Project...

  18. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 24 Housing and Urban Development 4 2010-04-01 2010-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  19. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 4 2014-04-01 2014-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  20. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  1. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 4 2011-04-01 2011-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  2. 24 CFR 884.212 - Project completion.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Project completion. 884.212 Section... RENTAL HOUSING PROJECTS Project Development and Operation § 884.212 Project completion. (a) FmHA certifications upon completion. Upon completion of the project, FmHA shall inspect the project and, if determined...

  3. Quality Assurance Project Plan for Citizen Science Projects

    EPA Pesticide Factsheets

    The Quality Assurance Project Plan is necessary for every project that collects or uses environmental data. It documents the project planning process and serves as a blueprint for how your project will run.

  4. The Characteristics of Project Managers: An Exploration of Complex Projects in the National Aeronautics and Space Administration

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.

    2000-01-01

    Study of characteristics and relationships of project managers of complex projects in the National Aeronautics and Space Administration. Study is based on Research Design, Data Collection, Interviews, Case Studies, and Data Analysis across varying disciplines such as biological research, space research, advanced aeronautical test facilities, aeronautic flight demonstrations, and projects at different NASA centers to ensure that findings were not endemic to one type of project management, or to one Center's management philosophies. Each project is treated as a separate case with the primary data collected during semi-structured interviews with the project manager responsible for the overall project. Results of the various efforts show some definite similarities of characteristics and relationships among the project managers in the study. A model for how the project managers formulated and managed their projects is included.

  5. Project Communication in Functions, Process and Project-Oriented Industiral Companies

    NASA Astrophysics Data System (ADS)

    Samáková, Jana; Koltnerová, Kristína; Rybanský, Rudolf

    2012-12-01

    The article is focused on the project communication management. Industrial enterprises, which use project management must constantly search the new ways for improving. One of the possibilities is the change of management from a functional oriented to the projectoriented or process-oriented. Process-oriented and project-oriented companies have better project communication management during the all project life cycle. Communication in the project is a very important factor. According to the arguments of several authors, one of the biggest problem is that threaten the success of the project is just the communication. In each project is an important pillar - and that is communication. Only on the base of communication can the project move forward and achieve the target.

  6. 77 FR 25715 - Mississippi 8 Hydro, LLC; FFP Project 98, LLC, ; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No., 13010-002; Project No., 14272-000] Mississippi 8 Hydro, LLC; FFP Project 98, LLC, ; Notice Announcing Filing Priority for.... Mississippi 8 Hydro, LLC--Project No. 13010-002. 2. FFP Project 98, LLC--Project No. 14272-000. Dated: April...

  7. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 36 Parks, Forests, and Public Property 1 2013-07-01 2013-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  8. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  9. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  10. 36 CFR 64.9 - Project costs (State and local projects).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Project costs (State and... RIGHTS-OF-WAY § 64.9 Project costs (State and local projects). To be eligible, acquisition and development costs must be incurred after the date of project approval and during the project period. The...

  11. 40 CFR 35.1650-1 - Project period.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Project period. 35.1650-1 Section 35... Lakes § 35.1650-1 Project period. (a) The project period for Phase 1 projects shall not exceed three years. (b) The project period for Phase 2 projects shall not exceed four years. Implementation of...

  12. Concentrating Solar Power Projects - Godawari Solar Project | Concentrating

    Science.gov Websites

    Solar Power | NREL Godawari Solar Project This page provides information on Godawari Solar Project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration. Status Date: February 13, 2014 Project Overview Project Name: Godawari Solar

  13. Project Atlas Field Definitions | NOAA Gulf Spill Restoration

    Science.gov Websites

    Archive Home Project Atlas Field Definitions Project Atlas Field Definitions Field Definition Project Title The Project Title as listed in the Final Early Restoration Plan and Environmental Assessment (FERP /EA). General Information: Project Description Narrative description of the project. General

  14. Concentrating Solar Power Projects - eCare Solar Thermal Project |

    Science.gov Websites

    Concentrating Solar Power | NREL eCare Solar Thermal Project This page provides information on eCare Solar Thermal Project, a concentrating solar power (CSP) project, with data organized by Project Name: eCare Solar Thermal Project Country: Morocco Location: Undefined Owner(s): CNIM (100

  15. 40 CFR 35.1650-1 - Project period.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 40 Protection of Environment 1 2014-07-01 2014-07-01 false Project period. 35.1650-1 Section 35... Lakes § 35.1650-1 Project period. (a) The project period for Phase 1 projects shall not exceed three years. (b) The project period for Phase 2 projects shall not exceed four years. Implementation of...

  16. 40 CFR 35.1650-1 - Project period.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 1 2013-07-01 2013-07-01 false Project period. 35.1650-1 Section 35... Lakes § 35.1650-1 Project period. (a) The project period for Phase 1 projects shall not exceed three years. (b) The project period for Phase 2 projects shall not exceed four years. Implementation of...

  17. 40 CFR 35.1650-1 - Project period.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Project period. 35.1650-1 Section 35... Lakes § 35.1650-1 Project period. (a) The project period for Phase 1 projects shall not exceed three years. (b) The project period for Phase 2 projects shall not exceed four years. Implementation of...

  18. 40 CFR 35.1650-1 - Project period.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Project period. 35.1650-1 Section 35... Lakes § 35.1650-1 Project period. (a) The project period for Phase 1 projects shall not exceed three years. (b) The project period for Phase 2 projects shall not exceed four years. Implementation of...

  19. Projective-anticipating, projective, and projective-lag synchronization of time-delayed chaotic systems on random networks.

    PubMed

    Feng, Cun-Fang; Xu, Xin-Jian; Wang, Sheng-Jun; Wang, Ying-Hai

    2008-06-01

    We study projective-anticipating, projective, and projective-lag synchronization of time-delayed chaotic systems on random networks. We relax some limitations of previous work, where projective-anticipating and projective-lag synchronization can be achieved only on two coupled chaotic systems. In this paper, we realize projective-anticipating and projective-lag synchronization on complex dynamical networks composed of a large number of interconnected components. At the same time, although previous work studied projective synchronization on complex dynamical networks, the dynamics of the nodes are coupled partially linear chaotic systems. In this paper, the dynamics of the nodes of the complex networks are time-delayed chaotic systems without the limitation of the partial linearity. Based on the Lyapunov stability theory, we suggest a generic method to achieve the projective-anticipating, projective, and projective-lag synchronization of time-delayed chaotic systems on random dynamical networks, and we find both its existence and sufficient stability conditions. The validity of the proposed method is demonstrated and verified by examining specific examples using Ikeda and Mackey-Glass systems on Erdos-Renyi networks.

  20. ASK Magazine. Volume 10

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward (Editor); Laufer, Alexander (Editor); Post, Todd (Editor); Brady, Jody Lannen (Editor)

    2003-01-01

    The Academy of Program and Project Leadership (APPL) and ASK Magazine is presented. APPL is a research-based organization that serves NASA program and project managers, as well as project teams, at every level of development. In 1997, APPL was created from an earlier program to underscore the importance that NASA places on project management and project teams through a wide variety of products and services, including knowledge sharing, classroom and online courses, career development guidance, performance support, university partnerships, and advanced technology tools. ASK Magazine grew out of our Knowledge Sharing Initiative. The stories that appear in ASK are written by the 'best of the best' project managers, primarily from NASA, but also from other government agencies and industry. These stories contain genuine nuggets of knowledge and wisdom that are transferable across projects. Who better than a project manager to help another project manager address a critical issue on a project? Big projects, small projects-they're all here in ASK. APPL is one of our most exciting publications about project management.

  1. Projection screen having reduced ambient light scattering

    DOEpatents

    Sweatt, William C [Albuquerque, NM

    2010-05-11

    An apparatus and method for improving the contrast between incident projected light and ambient light reflected from a projection screen are described. The efficiency of the projection screen for reflection of the projected light remains high, while permitting the projection screen to be utilized in a brightly lighted room. Light power requirements from the projection system utilized may be reduced.

  2. EVALUATION OF A PROCEDURE FOR USING DAYLIGHT PROJECTION OF FILM LOOPS IN TEACHING SKILLS.

    ERIC Educational Resources Information Center

    HARBY, S.F.

    EQUIPMENT USING A TRANSLUCENT SCREEN AND REAR PROJECTION HAS MADE IT POSSIBLE TO PROJECT MOTION PICTURES IN DAYLIGHT (DAYLIGHT PROJECTION). FILMS CAN BE SHOWN REPEATEDLY WHEN FORMED INTO A FILM LOOP (CONTINUOUS LOOP PROJECTION). DAYLIGHT PROJECTION AND CONTINUOUS LOOP PROJECTION WERE USED TO INVESTIGATE THE FOLLOWING QUESTIONS--(1) ARE FILM LOOP…

  3. 24 CFR 290.25 - Determination not to preserve a project or a part of a project.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.25... dispose of, a HUD-owned multifamily housing project, or any portion of such a project, or to foreclose a HUD-held mortgage on a multifamily housing project, without ensuring its continued availability as...

  4. 24 CFR 290.25 - Determination not to preserve a project or a part of a project.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.25... dispose of, a HUD-owned multifamily housing project, or any portion of such a project, or to foreclose a HUD-held mortgage on a multifamily housing project, without ensuring its continued availability as...

  5. 24 CFR 290.25 - Determination not to preserve a project or a part of a project.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.25... dispose of, a HUD-owned multifamily housing project, or any portion of such a project, or to foreclose a HUD-held mortgage on a multifamily housing project, without ensuring its continued availability as...

  6. 24 CFR 290.25 - Determination not to preserve a project or a part of a project.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... MULTIFAMILY PROJECTS AND SALE OF HUD-HELD MULTIFAMILY MORTGAGES Disposition of Multifamily Projects § 290.25... dispose of, a HUD-owned multifamily housing project, or any portion of such a project, or to foreclose a HUD-held mortgage on a multifamily housing project, without ensuring its continued availability as...

  7. 77 FR 12281 - Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14181-000; Project No. 14195-000] Lock+ Hydro Friends Fund XLIII; FFP Project 53, LLC; Notice Announcing Filing Priority for... follows: 1. Lock+ Hydro Friends Fund XLIII, Project No. 14181-000. 2. FFP Project 53, LLC, Project No...

  8. 77 FR 12280 - Lock+ Hydro Friends Fund XLI; FFP Project 54, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14182-000; Project No. 14192-000] Lock+ Hydro Friends Fund XLI; FFP Project 54, LLC; Notice Announcing Filing Priority for... follows: 1. FFP Project 54, LLC, Project No. 14192-000. 2. Lock+ Hydro Friends Fund XLI, Project No. 14182...

  9. 77 FR 12280 - Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14186-000; Project No. 14197-000] Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC;Notice Announcing Filing Priority for... follows: 1. Lock+ Hydro Friends Fund XXXV, Project No. 14186-000. 2. FFP Project 57, LLC, Project No...

  10. 77 FR 12279 - Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14184-000; Project No. 14191-000] Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Filing Priority for... follows: 1. Lock+ Hydro Friends Fund XXXVIII, Project No. 14184-000. 2. FFP Project 1, LLC, Project No...

  11. View Early Restoration Project Ideas | NOAA Gulf Spill Restoration

    Science.gov Websites

    Archive Home View Early Restoration Project Ideas View Early Restoration Project Ideas share Posted on , these natural resource trustees have been accepting restoration project ideas from members of the public online. Use the map to see projects by location or view projects in a list. If you have project ideas

  12. Deploying Applications on the Peregrine System | High-Performance Computing

    Science.gov Websites

    ;write" access to ecom, email wesley.jones@nrel.gov For collaboration across a single project, we the /projects/project> directory that is visible to everyone associated with the project , and can be controlled completely by the project staff. By adding a /projects/project>

  13. Concentrating Solar Power Projects in India | Concentrating Solar Power |

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. Abhijeet Solar Project ACME Solar Tower Dadri ISCC Plant Dhursar Diwakar Godawari Solar Project Gujarat Solar One KVK Energy Solar Project Megha Solar Plant National Solar Thermal Power Facility

  14. Influence of Selected Stakeholders of Construction Investment Projects on the Course of Project

    NASA Astrophysics Data System (ADS)

    Bizon-Górecka, Jadwiga; Górecki, Jarosław

    2017-10-01

    The article presents an entity perspective of the construction investment projects. In a course of the project there are stakeholders who have an indirect influence (e.g. decision-makers in the selection of projects) or a direct influence (e.g. members of the project team). An intuitive opinion about a significant influence of project stakeholders on the project’s course encouraged the authors to undertake a research in this area. The article illustrates the initial phases of the construction project life cycle in a perspective of the entities and, in particular, a role of different stakeholders in making decisions that affect a course of the project. An analysis of the structure of the construction project life cycle makes a substantial involvement of various subjects in the initial phases of the project, i.e. in an initial phase and during a creation of the structures. A key point is to underline the factors of decision-making by the participants of the construction process. It was indicated that the stakeholders have a different impact on the course of the project. In large projects, which have many stakeholders, their role in the implementation of the investment project can vary, depending on the life cycle of the project. They can have positive or negative impacts on achieving the project objectives. The paper presents the results of 100 surveys made among participants of the building processes, executors of the construction projects in the Kuyavian-Pomeranian region. The study was conducted in December 2016 and January 2017. It revealed what is the impact of individual stakeholders of the construction projects on the course of the project. A special attention was paid to a complex relationship between objectives of the project and stakeholders’ goals. A great care to the smallest possible number of risks, which may arise from the different objectives of the project and its stakeholders’ goals, should be focused on the augmentation of correlation of measures of the goals. It is crucial to identify the stakeholders, whereas it is a continuous and quite difficult process. However, when ignoring the impact of specific stakeholders on the implementation of the project, a duration of the project and its costs may increase. A main problem, in establishing a relationship of participants in the construction process, is to take into account the risk of all project stakeholders.

  15. A Simple Approach to Achieve Modified Projective Synchronization between Two Different Chaotic Systems

    PubMed Central

    2013-01-01

    A new approach, the projective system approach, is proposed to realize modified projective synchronization between two different chaotic systems. By simple analysis of trajectories in the phase space, a projective system of the original chaotic systems is obtained to replace the errors system to judge the occurrence of modified projective synchronization. Theoretical analysis and numerical simulations show that, although the projective system may not be unique, modified projective synchronization can be achieved provided that the origin of any of projective systems is asymptotically stable. Furthermore, an example is presented to illustrate that even a necessary and sufficient condition for modified projective synchronization can be derived by using the projective system approach. PMID:24187522

  16. An Analysis of the Management of RED HORSE (Rapid Engineering Deployable, Heavy Operational Repair Squadron, Engineer) Construction Projects

    DTIC Science & Technology

    1987-09-01

    folder . 4. Reviewing design documents and supervises project if designed by other than RED HORSE. 5. Chairing design conferences. 6. Coordinating design...project folder . Air Force Regulation 93-9 requires the project manager to maintain the following records: A. Approved project programming documents. B...these records are maintained in the project folder . Depending on the current status of the project, the project folder will be available from either the

  17. Exploring Stakeholder Definitions within the Aerospace Industry: A Qualitative Case Study

    NASA Astrophysics Data System (ADS)

    Hebert, Jonathan R.

    A best practice in the discipline of project management is to identify all key project stakeholders prior to the execution of a project. When stakeholders are properly identified, they can be consulted to provide expert advice on project activities so that the project manager can ensure the project stays within the budget and schedule constraints. The problem addressed by this study is that managers fail to properly identify key project stakeholders when using stakeholder theory because there are multiple conflicting definitions for the term stakeholder. Poor stakeholder identification has been linked to multiple negative project outcomes such as budget and schedules overruns, and this problem is heightened in certain industries such as aerospace. The purpose of this qualitative study was to explore project managers' and project stakeholders' perceptions of how they define and use the term stakeholder within the aerospace industry. This qualitative exploratory single-case study had two embedded units of analysis: project managers and project stakeholders. Six aerospace project managers and five aerospace project stakeholders were purposively selected for this study. Data were collected through individual semi-structured interviews with both project managers and project stakeholders. All data were analyzed using Yin's (2011) five-phased cycle approach for qualitative research. The results indicated that the aerospace project managers and project stakeholder define the term stakeholder as "those who do the work of a company." The participants build upon this well-known concept by adding that, "a company should list specific job titles" that correspond to their company specific-stakeholder definition. Results also indicated that the definition of the term stakeholder is used when management is assigning human resources to a project to mitigate or control project risk. Results showed that project managers tended to include the customer in their stakeholder definitions while project stakeholders included a wider range of stakeholders from young employees to union workers. Practical application recommendations, based on the study's findings, include that companies start to develop company-specific definitions of the term stakeholder. Recommendations for future research should focus on exploring how CEOs, executive members, new hires, and hourly workers define and use the term stakeholder in the aerospace industry.

  18. 23 CFR 810.302 - Eligible projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.302 Eligible projects. (a) Eligible projects are those defined as nonhighway public mass transit projects in...

  19. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2010-10-01 2010-10-01 false Covered projects. 633.11 Section 633.11...

  20. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2012-10-01 2012-10-01 false Covered projects. 633.11 Section 633.11...

  1. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2013-10-01 2013-10-01 false Covered projects. 633.11 Section 633.11...

  2. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2014-10-01 2014-10-01 false Covered projects. 633.11 Section 633.11...

  3. 49 CFR 633.11 - Covered projects.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Oversight Services § 633.11 Covered projects. The Administrator may contract for project management oversight services when the... 49 Transportation 7 2011-10-01 2011-10-01 false Covered projects. 633.11 Section 633.11...

  4. Relationship between time management in construction industry and project management performance

    NASA Astrophysics Data System (ADS)

    Nasir, Najuwa; Nawi, Mohd Nasrun Mohd; Radzuan, Kamaruddin

    2016-08-01

    Nowadays, construction industry particularly in Malaysia struggle in achieving status of eminent time management for construction project. Project managers have a great responsibility to keep the project success under time of project completion. However, studies shows that delays especially in Malaysian construction industry still unresolved due to weakness in managing the project. In addition, quality of time management on construction projects is generally poor. Due to the progressively extended delays issue, time performance becomes an important subject to be explored to investigate delay factors. The method of this study is review of literature towards issues in construction industry which affecting time performance of project in general by focusing towards process involved for project management. Based on study, it was found that knowledge, commitment, cooperation are the main criteria as an overall to manage the project into a smooth process during project execution until completion. It can be concluded that, the strength between project manager and team members in these main criteria while conducting the project towards good time performance is highly needed. However, there is lack of establishment towards factors of poor time performance which strongly related with project management. Hence, this study has been conducted to establish factors of poor time performance and its relations with project management.

  5. Traditional Project Management and the Visual Workplace Environment to Improve Project Success

    ERIC Educational Resources Information Center

    Fichera, Christopher E.

    2016-01-01

    A majority of large IT projects fail to meet scheduled deadlines, are over budget and do not satisfy the end user. Many projects fail in spite of utilizing traditional project management techniques. Research of project management has not identified the use of a visual workspace as a feature affecting or influencing the success of a project during…

  6. How Does a Project Manager's Level of Development Influence Conceptualizations of Project Management and the Project Development Environment?

    ERIC Educational Resources Information Center

    Lynch, Margaret M.

    2013-01-01

    This study explores the meaning project managers (PMs) make of their project environment, how they lead their teams and have incorporate complexity into their project management approach. The exploration of the PM's developmental level and meaning making offers a different angle on the project management and leadership literature. The study…

  7. A Correlational Study Assessing the Relationships among Information Technology Project Complexity, Project Complication, and Project Success

    ERIC Educational Resources Information Center

    Williamson, David J.

    2011-01-01

    The specific problem addressed in this study was the low success rate of information technology (IT) projects in the U.S. Due to the abstract nature and inherent complexity of software development, IT projects are among the most complex projects encountered. Most existing schools of project management theory are based on the rational systems…

  8. The Human Genome Diversity Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cavalli-Sforza, L.

    1994-12-31

    The Human Genome Diversity Project (HGD Project) is an international anthropology project that seeks to study the genetic richness of the entire human species. This kind of genetic information can add a unique thread to the tapestry knowledge of humanity. Culture, environment, history, and other factors are often more important, but humanity`s genetic heritage, when analyzed with recent technology, brings another type of evidence for understanding species` past and present. The Project will deepen the understanding of this genetic richness and show both humanity`s diversity and its deep and underlying unity. The HGD Project is still largely in its planningmore » stages, seeking the best ways to reach its goals. The continuing discussions of the Project, throughout the world, should improve the plans for the Project and their implementation. The Project is as global as humanity itself; its implementation will require the kinds of partnerships among different nations and cultures that make the involvement of UNESCO and other international organizations particularly appropriate. The author will briefly discuss the Project`s history, describe the Project, set out the core principles of the Project, and demonstrate how the Project will help combat the scourge of racism.« less

  9. AGRI Grain Power ethanol-for-fuel project feasibility-study report. Volume I. Project conceptual design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-04-01

    The AGRI GRAIN POWER (AGP) Project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. The Project conceptual design is presented in this volume.« less

  10. Project Management for International Development.

    ERIC Educational Resources Information Center

    Axelrod, Valija M.; Magisos, Joel H.

    A project developed a content model for international project management training. It also compiled a bibliography of project management references, identified specific project management training needs based upon a survey of international sponsors and contractor personnel, and documented the training needs of international project managers. Data…

  11. 49 CFR 633.5 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...

  12. Aviation Safety Program: Weather Accident Prevention (WxAP) Project Overview and Status

    NASA Technical Reports Server (NTRS)

    Nadell, Shari-Beth

    2003-01-01

    This paper presents a project overview and status for the Weather Accident Prevention (WxAP) aviation safety program. The topics include: 1) Weather Accident Prevention Project Background/History; 2) Project Modifications; 3) Project Accomplishments; and 4) Project's Next Steps.

  13. 49 CFR 633.5 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...

  14. 49 CFR 633.5 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...

  15. 49 CFR 633.5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...

  16. 49 CFR 633.5 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT General Provisions § 633.5 Definitions. As used in this part... construction and management of a project. Major capital project means a project that: (1) Involves the...; or (3) The Administrator determines is a major capital project because the project management...

  17. Project Management Life Cycle Models to Improve Management in High-rise Construction

    NASA Astrophysics Data System (ADS)

    Burmistrov, Andrey; Siniavina, Maria; Iliashenko, Oksana

    2018-03-01

    The paper describes a possibility to improve project management in high-rise buildings construction through the use of various Project Management Life Cycle Models (PMLC models) based on traditional and agile project management approaches. Moreover, the paper describes, how the split the whole large-scale project to the "project chain" will create the factor for better manageability of the large-scale buildings project and increase the efficiency of the activities of all participants in such projects.

  18. A New Tool for Effective and Efficient Project Management

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Willett, Jesse A

    2011-12-01

    Organizations routinely handle thousands of projects per year, and it is difficult to manage all these projects concurrently. Too often, projects do not get the attention they need when they need it. Management inattention can lead to late projects or projects with less than desirable content and/or deliverables. This paper discusses the application of Visual Project Management (VPM) as a method to track and manage projects. The VPM approach proved to be a powerful management tool without the overhead and restrictions of traditional management methods.

  19. The Earth System CoG Collaboration Environment

    NASA Astrophysics Data System (ADS)

    DeLuca, C.; Murphy, S.; Cinquini, L.; Treshansky, A.; Wallis, J. C.; Rood, R. B.; Overeem, I.

    2013-12-01

    The Earth System CoG supports collaborative Earth science research and product development in virtual organizations that span multiple projects and communities. It provides access to data, metadata, and visualization services along with tools that support open project governance, and it can be used to host individual projects or to profile projects hosted elsewhere. All projects on CoG are described using a project ontology - an organized common vocabulary - that exposes information needed for collaboration and decision-making. Projects can be linked into a network, and the underlying ontology enables consolidated views of information across the network. This access to information promotes the creation of active and knowledgeable project governance, at both individual and aggregate project levels. CoG is being used to support software development projects, model intercomparison projects, training classes, and scientific programs. Its services and ontology are customizable by project. This presentation will provide an overview of CoG, review examples of current use, and discuss how CoG can be used as knowledge and coordination hub for networks of projects in the Earth Sciences.

  20. Identifying inaccuracy of MS Project using system analysis

    NASA Astrophysics Data System (ADS)

    Fachrurrazi; Husin, Saiful; Malahayati, Nurul; Irzaidi

    2018-05-01

    The problem encountered in project owner’s financial accounting report is the difference in total project costs of MS Project to the Indonesian Standard (Standard Indonesia Standard / Cost Estimating Standard Book of Indonesia). It is one of the MS Project problems concerning to its cost accuracy, so cost data cannot be used in an integrated way for all project components. This study focuses on finding the causes of inaccuracy of the MS Projects. The aim of this study, which is operationally, are: (i) identifying cost analysis procedures for both current methods (SNI) and MS Project; (ii) identifying cost bias in each element of the cost analysis procedure; and (iii) analysing the cost differences (cost bias) in each element to identify what the cause of inaccuracies in MS Project toward SNI is. The method in this study is comparing for both the system analysis of MS Project and SNI. The results are: (i) MS Project system in Work of Resources element has limitation for two decimal digits only, have led to its inaccuracy. Where the Work of Resources (referred to as effort) in MS Project represents multiplication between the Quantities of Activities and Requirements of resources in SNI; (ii) MS Project and SNI have differences in the costing methods (the cost estimation methods), in which the SNI uses the Quantity-Based Costing (QBC), meanwhile MS Project uses the Time-Based Costing (TBC). Based on this research, we recommend to the contractors who use SNI should make an adjustment for Work of Resources in MS Project (with correction index) so that it can be used in an integrated way to the project owner’s financial accounting system. Further research will conduct for improvement the MS Project as an integrated tool toward all part of the project participant.

  1. A Model Collaborative Platform for Geoscience Education

    NASA Astrophysics Data System (ADS)

    Fox, S.; Manduca, C. A.; Iverson, E. A.

    2012-12-01

    Over the last decade SERC at Carleton College has developed a collaborative platform for geoscience education that has served dozens of projects, thousands of community authors and millions of visitors. The platform combines a custom technical infrastructure: the SERC Content Management system (CMS), and a set of strategies for building web-resources that can be disseminated through a project site, reused by other projects (with attribution) or accessed via an integrated geoscience education resource drawing from all projects using the platform. The core tools of the CMS support geoscience education projects in building project-specific websites. Each project uses the CMS to engage their specific community in collecting, authoring and disseminating the materials of interest to them. At the same time the use of a shared central infrastructure allows cross-fertilization among these project websites. Projects are encouraged to use common templates and common controlled vocabularies for organizing and displaying their resources. This standardization is then leveraged through cross-project search indexing which allow projects to easily incorporate materials from other projects within their own collection in ways that are relevant and automated. A number of tools are also in place to help visitors move among project websites based on their personal interests. Related links help visitors discover content related topically to their current location that is in a 'separate' project. A 'best bets' feature in search helps guide visitors to pages that are good starting places to explore resources on a given topic across the entire range of hosted projects. In many cases these are 'site guide' pages created specifically to promote a cross-project view of the available resources. In addition to supporting the cross-project exploration of specific themes the CMS also allows visitors to view the combined suite of resources authored by any particular community member. Automatically generated author profiles highlight the contributions an individual has made through any of the projects with an option for customization by the author. An overarching portal site provides a unified view of resources within this diverse set of geoscience education projects. The SERC CMS provides a common platform upon which individual projects can build their own identities, while allowing cross-project pollination and synergies to be realized without significant extra investment by each project. This is a sustainable model for a collaborative platform that takes advantage of the energy and resources of individual projects to advance larger community goals.

  2. Program and Project Management Framework

    NASA Technical Reports Server (NTRS)

    Butler, Cassandra D.

    2002-01-01

    The primary objective of this project was to develop a framework and system architecture for integrating program and project management tools that may be applied consistently throughout Kennedy Space Center (KSC) to optimize planning, cost estimating, risk management, and project control. Project management methodology used in building interactive systems to accommodate the needs of the project managers is applied as a key component in assessing the usefulness and applicability of the framework and tools developed. Research for the project included investigation and analysis of industrial practices, KSC standards, policies, and techniques, Systems Management Office (SMO) personnel, and other documented experiences of project management experts. In addition, this project documents best practices derived from the literature as well as new or developing project management models, practices, and techniques.

  3. Studies on combined model based on functional objectives of large scale complex engineering

    NASA Astrophysics Data System (ADS)

    Yuting, Wang; Jingchun, Feng; Jiabao, Sun

    2018-03-01

    As various functions were included in large scale complex engineering, and each function would be conducted with completion of one or more projects, combined projects affecting their functions should be located. Based on the types of project portfolio, the relationship of projects and their functional objectives were analyzed. On that premise, portfolio projects-technics based on their functional objectives were introduced, then we studied and raised the principles of portfolio projects-technics based on the functional objectives of projects. In addition, The processes of combined projects were also constructed. With the help of portfolio projects-technics based on the functional objectives of projects, our research findings laid a good foundation for management of large scale complex engineering portfolio management.

  4. Servant leadership behaviors of aerospace and defense project managers and their relation to project success

    NASA Astrophysics Data System (ADS)

    Dominik, Michael T.

    The success of a project is dependent in part on the skills, knowledge, and behavior of its leader, the project manager. Despite advances in project manager certifications and professional development, the aerospace and defense industry has continued to see highly visible and expensive project failures partially attributable to failures in leadership. Servant leadership is an emerging leadership theory whose practitioners embrace empowerment, authenticity, humility, accountability, forgiveness, courage, standing back, and stewardship, but has not yet been fully examined in the context of the project manager as leader. The objective of this study was to examine the relationship between servant leadership behaviors demonstrated by aerospace and defense project managers and the resulting success of their projects. Study participants were drawn from aerospace and defense oriented affinity groups from the LinkedInRTM social media web system. The participants rated their project managers using a 30-item servant leadership scale, and rated the success of their project using a 12-item project success scale. One hundred and fifteen valid responses were analyzed from 231 collected samples from persons who had worked for a project manager on an aerospace and defense project within the past year. The results of the study demonstrated statistically significant levels of positive correlation to project success for all eight servant leadership factors independently evaluated. Using multiple linear regression methods, the servant leadership factors of empowerment and authenticity were determined to be substantial and statistically significant predictors of project success. The study results established the potential application of servant leadership as a valid approach for improving outcomes of projects.

  5. Research Project Evaluation-Learnings from the PATHWAYS Project Experience.

    PubMed

    Galas, Aleksander; Pilat, Aleksandra; Leonardi, Matilde; Tobiasz-Adamczyk, Beata

    2018-05-25

    Every research project faces challenges regarding how to achieve its goals in a timely and effective manner. The purpose of this paper is to present a project evaluation methodology gathered during the implementation of the Participation to Healthy Workplaces and Inclusive Strategies in the Work Sector (the EU PATHWAYS Project). The PATHWAYS project involved multiple countries and multi-cultural aspects of re/integrating chronically ill patients into labor markets in different countries. This paper describes key project's evaluation issues including: (1) purposes, (2) advisability, (3) tools, (4) implementation, and (5) possible benefits and presents the advantages of a continuous monitoring. Project evaluation tool to assess structure and resources, process, management and communication, achievements, and outcomes. The project used a mixed evaluation approach and included Strengths (S), Weaknesses (W), Opportunities (O), and Threats (SWOT) analysis. A methodology for longitudinal EU projects' evaluation is described. The evaluation process allowed to highlight strengths and weaknesses and highlighted good coordination and communication between project partners as well as some key issues such as: the need for a shared glossary covering areas investigated by the project, problematic issues related to the involvement of stakeholders from outside the project, and issues with timing. Numerical SWOT analysis showed improvement in project performance over time. The proportion of participating project partners in the evaluation varied from 100% to 83.3%. There is a need for the implementation of a structured evaluation process in multidisciplinary projects involving different stakeholders in diverse socio-environmental and political conditions. Based on the PATHWAYS experience, a clear monitoring methodology is suggested as essential in every multidisciplinary research projects.

  6. Landfill Gas Energy Project Data and Landfill Technical Data

    EPA Pesticide Factsheets

    This page provides data from the LMOP Database for U.S. landfills and LFG energy projects in Excel files, a map of project and candidate landfill counts by state, project profiles for a select group of projects, and information about Project Expo sites.

  7. [The research project: financing and management].

    PubMed

    Schena, F P

    2003-01-01

    Basic and clinical research is accomplished by projects. The design of a project is not only based on the scientific content but also on its financing and management. This article wants to illustrate the correct modalities for project financing and project management in a scientific project.

  8. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or... 28 Judicial Administration 2 2010-07-01 2010-07-01 false Volunteer community service projects. 551...

  9. 75 FR 49518 - Northwest Area Water Supply Project, North Dakota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  10. 75 FR 48986 - Northwest Area Water Supply Project, North Dakota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  11. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 28 Judicial Administration 2 2014-07-01 2014-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...

  12. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 28 Judicial Administration 2 2012-07-01 2012-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...

  13. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 28 Judicial Administration 2 2011-07-01 2011-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...

  14. 28 CFR 551.60 - Volunteer community service projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 28 Judicial Administration 2 2013-07-01 2013-07-01 false Volunteer community service projects. 551... MANAGEMENT MISCELLANEOUS Volunteer Community Service Projects § 551.60 Volunteer community service projects. (a) A volunteer community service project is a project sponsored and developed by local government or...

  15. 44 CFR 209.6 - Project eligibility.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 44 Emergency Management and Assistance 1 2013-10-01 2013-10-01 false Project eligibility. 209.6... Project eligibility. (a) Eligible types of project activities. This grant authority is for projects to... floodprone structures. Approved projects must meet the following criteria and comply with all other program...

  16. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...

  17. 44 CFR 209.6 - Project eligibility.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 44 Emergency Management and Assistance 1 2011-10-01 2011-10-01 false Project eligibility. 209.6... Project eligibility. (a) Eligible types of project activities. This grant authority is for projects to... floodprone structures. Approved projects must meet the following criteria and comply with all other program...

  18. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...

  19. 44 CFR 209.6 - Project eligibility.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 44 Emergency Management and Assistance 1 2014-10-01 2014-10-01 false Project eligibility. 209.6... Project eligibility. (a) Eligible types of project activities. This grant authority is for projects to... floodprone structures. Approved projects must meet the following criteria and comply with all other program...

  20. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...

  1. 24 CFR 232.902 - Eligible project.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Eligible project. 232.902 Section... FACILITIES Insurance of Mortgages Covering Existing Projects § 232.902 Eligible project. Existing projects... for insurance under this subpart. The project must not require substantial rehabilitation and three...

  2. Give Us Your Ideas | NOAA Gulf Spill Restoration

    Science.gov Websites

    , you can still make your voice heard by submitting a project idea. Restoration Project Ideas Suggest a Project If you have project ideas, you can submit them online. You can also view projects that have been submitted for consideration. When and How Will My Project Be Considered? Your project ideas are being

  3. Concentrating Solar Power Projects in China | Concentrating Solar Power |

    Science.gov Websites

    Delingha 50MW Thermal Oil Parabolic Trough project Gansu Akesai 50MW Molten Salt Trough project Golden Tower 100MW Molten Salt project Golmud Gulang 100MW Thermal Oil Parabolic Trough project Hami 50 MW CSP Yumen 50MW Thermal Oil Trough project Shangyi 50MW DSG Tower CSP project SunCan Dunhuang 10 MW Phase I

  4. The accuracy of general practitioner workforce projections

    PubMed Central

    2013-01-01

    Background Health workforce projections are important instruments to prevent imbalances in the health workforce. For both the tenability and further development of these projections, it is important to evaluate the accuracy of workforce projections. In the Netherlands, health workforce projections have been done since 2000 to support health workforce planning. What is the accuracy of the techniques of these Dutch general practitioner workforce projections? Methods We backtested the workforce projection model by comparing the ex-post projected number of general practitioners with the observed number of general practitioners between 1998 and 2011. Averages of historical data were used for all elements except for inflow in training. As the required training inflow is the key result of the workforce planning model, and has actually determined past adjustments of training inflow, the accuracy of the model was backtested using the observed training inflow and not an average of historical data to avoid the interference of past policy decisions. The accuracy of projections with different lengths of projection horizon and base period (on which the projections are based) was tested. Results The workforce projection model underestimated the number of active Dutch general practitioners in most years. The mean absolute percentage errors range from 1.9% to 14.9%, with the projections being more accurate in more recent years. Furthermore, projections with a shorter projection horizon have a higher accuracy than those with a longer horizon. Unexpectedly, projections with a shorter base period have a higher accuracy than those with a longer base period. Conclusions According to the results of the present study, forecasting the size of the future workforce did not become more difficult between 1998 and 2011, as we originally expected. Furthermore, the projections with a short projection horizon and a short base period are more accurate than projections with a longer projection horizon and base period. We can carefully conclude that health workforce projections can be made with data based on relatively short base periods, although detailed data are still required to monitor and evaluate the health workforce. PMID:23866676

  5. All-Elastomer 3-Axis Contact Resistive Tactile Sensor Arrays and Micromilled Manufacturing Methods Thereof

    NASA Technical Reports Server (NTRS)

    Penskiy, Ivan (Inventor); Charalambides, Alexandros (Inventor); Bergbreiter, Sarah (Inventor)

    2018-01-01

    At least one tactile sensor includes an insulating layer and a conductive layer formed on the surface of the insulating layer. The conductive layer defines at least one group of flexible projections extending orthogonally from the surface of the insulating layer. The flexible projections include a major projection extending a distance orthogonally from the surface and at least one minor projection that is adjacent to and separate from the major projection wherein the major projection extends a distance orthogonally that is greater than the distance that the minor projection extends orthogonally. Upon a compressive force normal to, or a shear force parallel to, the surface, the major projection and the minor projection flex such that an electrical contact resistance is formed between the major projection and the minor projection. A capacitive tactile sensor is also disclosed that responds to the normal and shear forces.

  6. DYNAMIC PROJECT COLLABORATION TOOLS FOR UNEXPLODED ORDNANCE (UXO) REMOVAL Case Study: Jefferson Proving Ground UXO Removal Projector

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Daffron, James Y.

    2003-02-27

    Unexploded Ordnance (UXO) removal and investigation projects typically involve multiple organizations including Government entities, private contractors, and technical experts. Resources are split into functional ''teams'' who perform the work and interface with the clients. The projects typically generate large amounts of data that must be shared among the project team members, the clients, and the public. The ability to efficiently communicate and control information is essential to project success. Web-based project collaboration is an effective management and communication tool when applied to ordnance and explosives (OE) projects. During a recent UXO/OE removal project at the Jefferson Proving Ground (JPG) inmore » Madison, IN, American Technologies, Inc. (ATI) successfully used the Project Commander(reg sign) (www.ProCommander.com) project collaboration website as a dynamic project and information management tool.« less

  7. Hardware Implementation of Multiple Fan Beam Projection Technique in Optical Fibre Process Tomography

    PubMed Central

    Rahim, Ruzairi Abdul; Fazalul Rahiman, Mohd Hafiz; Leong, Lai Chen; Chan, Kok San; Pang, Jon Fea

    2008-01-01

    The main objective of this project is to implement the multiple fan beam projection technique using optical fibre sensors with the aim to achieve a high data acquisition rate. Multiple fan beam projection technique here is defined as allowing more than one emitter to transmit light at the same time using the switch-mode fan beam method. For the thirty-two pairs of sensors used, the 2-projection technique and 4-projection technique are being investigated. Sixteen sets of projections will complete one frame of light emission for the 2-projection technique while eight sets of projection will complete one frame of light emission for the 4-projection technique. In order to facilitate data acquisition process, PIC microcontroller and the sample and hold circuit are being used. This paper summarizes the hardware configuration and design for this project. PMID:27879885

  8. 33 CFR 385.12 - Pilot projects.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... management, and wastewater reuse. The purpose of the pilot projects is to develop information necessary to... Processes § 385.12 Pilot projects. (a) The Plan includes pilot projects to address uncertainties associated...-Federal sponsor shall develop a Project Management Plan as described in § 385.24. (c) Project...

  9. Geothermal Project Consulting | Geothermal Technologies | NREL

    Science.gov Websites

    Geothermal Project Consulting Geothermal Project Consulting When consulting on projects, NREL focuses on identifying specific barriers or challenges that are likely to impact geothermal project , validation, and deployment of geothermal technologies Assess and evaluate geothermal R&D projects

  10. 24 CFR 266.200 - Eligible projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...

  11. 24 CFR 266.200 - Eligible projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...

  12. 24 CFR 266.200 - Eligible projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...

  13. 24 CFR 266.200 - Eligible projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Eligible projects. 266.200 Section... FINANCE AGENCY RISK-SHARING PROGRAM FOR INSURED AFFORDABLE MULTIFAMILY PROJECT LOANS Program Requirements § 266.200 Eligible projects. (a) Minimum project size. Projects insured under this part must consist of...

  14. Project Notes

    ERIC Educational Resources Information Center

    School Science Review, 1978

    1978-01-01

    Presents sixteen project notes developed by pupils of Chipping Norton School and Bristol Grammar School, in the United Kingdom. These Projects include eight biology A-level projects and eight Chemistry A-level projects. (HM)

  15. 78 FR 54294 - Sunshine Act Meeting; Board of Directors Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-03

    ...--Robert D. Hormats. 4. Confirmation--Michael S. Whalen as Vice President, Structured Finance. 5. Minutes...: (Closed to the Public 2:15 p.m.): 1. Finance Project--Kenya and Tanzania. 2. Finance Project--Pakistan. 3. Finance Project--Chile. 4. Finance Project--Brazil. 5. Finance Project--Turkey. 6. Finance Project--Chile...

  16. Ace Project as a Project Management Tool

    ERIC Educational Resources Information Center

    Cline, Melinda; Guynes, Carl S.; Simard, Karine

    2010-01-01

    The primary challenge of project management is to achieve the project goals and objectives while adhering to project constraints--usually scope, quality, time and budget. The secondary challenge is to optimize the allocation and integration of resources necessary to meet pre-defined objectives. Project management software provides an active…

  17. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  18. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  19. Lessons Learned from Client Projects in an Undergraduate Project Management Course

    ERIC Educational Resources Information Center

    Pollard, Carol E.

    2012-01-01

    This work proposes that a subtle combination of three learning methods offering "just in time" project management knowledge, coupled with hands-on project management experience can be particularly effective in producing project management students with employable skills. Students were required to apply formal project management knowledge to gain…

  20. Agile Project Management for e-Learning Developments

    ERIC Educational Resources Information Center

    Doherty, Iain

    2010-01-01

    We outline the project management tactics that we developed in praxis in order to manage elearning projects and show how our tactics were enhanced through implementing project management techniques from a formal project management methodology. Two key factors have contributed to our project management success. The first is maintaining a clear…

  1. Project Success in Agile Development Software Projects

    ERIC Educational Resources Information Center

    Farlik, John T.

    2016-01-01

    Project success has multiple definitions in the scholarly literature. Research has shown that some scholars and practitioners define project success as the completion of a project within schedule and within budget. Others consider a successful project as one in which the customer is satisfied with the product. This quantitative study was conducted…

  2. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 49 Transportation 7 2010-10-01 2010-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  3. External Research in AISD: Knowledge for Building, 1982-83.

    ERIC Educational Resources Information Center

    Austin Independent School District, TX. Office of Research and Evaluation.

    The Austin Independent School District (AISD) Office of Research and Development, presents abstracts of research projects conducted by external agencies or individuals within AISD. For 33 projects, this report contains the AISD project number, project title, project director, project sponsor, schools where conducted, and whether or not a full…

  4. 40 CFR 403.20 - Pretreatment Program Reinvention Pilot Projects Under Project XL.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 30 2013-07-01 2012-07-01 true Pretreatment Program Reinvention Pilot Projects Under Project XL. 403.20 Section 403.20 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY... OF POLLUTION § 403.20 Pretreatment Program Reinvention Pilot Projects Under Project XL. The Approval...

  5. 77 FR 41980 - Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Uniontown Hydro, LLC, Project No. 12958-001-Kentucky and Indiana, Uniontown Hydroelectric Project; Newburgh Hydro, LLC, Project No. 12962-001-Kentucky and Indiana, Newburgh Hydroelectric Project; Notice of Revised Restricted Service List for a...

  6. 76 FR 62869 - Sunshine Notice-October 27, 2011 Board of Directors Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    .... Revised Delegation of Authority 4. Finance Project--Egypt and South Sudan (upon the opening of OPIC Programs) 5. Finance Project--Guatemala 6. Finance Project--Peru 7. Finance Project--Mexico 8. Finance Project--Global 9. Finance Project--Mexico, Ukraine, Brazil, Colombia, Jamaica, Egypt, Vietnam, India and...

  7. 18 CFR 4.3 - Report on project cost.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...

  8. 49 CFR 602.9 - Federal share.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... operations, emergency protective measures, emergency repairs, permanent repairs and resiliency projects under 49 U.S.C. 5324 shall be for up to 80 percent of the net project cost. (b) A grant made available... project cost for capital projects, and up to 50 percent of the net project cost for operations projects...

  9. 49 CFR 602.9 - Federal share.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... operations, emergency protective measures, emergency repairs, permanent repairs and resiliency projects under 49 U.S.C. 5324 shall be for up to 80 percent of the net project cost. (b) A grant made available... project cost for capital projects, and up to 50 percent of the net project cost for operations projects...

  10. 18 CFR 4.3 - Report on project cost.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...

  11. 18 CFR 4.3 - Report on project cost.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...

  12. 18 CFR 4.3 - Report on project cost.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Report on project cost... OF PROJECT COSTS Determination of Cost of Projects Constructed Under License § 4.3 Report on project..., cost records, engineering reports, and other records supporting the project's original cost. The audit...

  13. A Real-World Project for a Desktop Publishing Course.

    ERIC Educational Resources Information Center

    Marsden, James D.

    1994-01-01

    Describes a project in a desktop publishing course in which students work with nonprofit and campus organizations to design brochures that fulfill important needs. Discusses specific tools students use. Describes the brochure project, project criteria, clients, text and graphics for the project, how to evaluate the project, and guidelines for…

  14. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  15. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 33 Navigation and Navigable Waters 3 2013-07-01 2013-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  16. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  17. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 33 Navigation and Navigable Waters 3 2012-07-01 2012-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  18. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  19. 33 CFR 385.24 - Project Management Plans.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 33 Navigation and Navigable Waters 3 2014-07-01 2014-07-01 false Project Management Plans. 385.24... Processes § 385.24 Project Management Plans. (a) General requirements. (1) The Corps of Engineers and the... agencies, develop a Project Management Plan prior to initiating activities on a project. (2) The Project...

  20. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 49 Transportation 7 2011-10-01 2011-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  1. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 49 Transportation 7 2012-10-01 2012-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  2. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 49 Transportation 7 2014-10-01 2014-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  3. 49 CFR 633.25 - Contents of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Contents of a project management plan. 633.25... ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.25 Contents of a project management plan. At a minimum, a recipient's project management plan shall include...

  4. 49 CFR 633.27 - Implementation of a project management plan.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 49 Transportation 7 2013-10-01 2013-10-01 false Implementation of a project management plan. 633... TRANSIT ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.27 Implementation of a project management plan. (a) Upon approval of a project management plan by...

  5. 23 CFR 751.23 - Concurrent junkyard control and right-of-way projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ...-way projects. The State is encouraged to coordinate junkyard control and highway right-of-way projects. Expenses incurred in furtherance of concurrent projects shall be prorated between projects. ... 23 Highways 1 2010-04-01 2010-04-01 false Concurrent junkyard control and right-of-way projects...

  6. Concentrating Solar Power Projects in Morocco | Concentrating Solar Power |

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. Airlight Energy Ait-Baha Pilot Plant eCare Solar Thermal Project IRESEN 1 MWe CSP-ORC pilot project ISCC Ain Beni

  7. Concentrating Solar Power Projects in United Arab Emirates | Concentrating

    Science.gov Websites

    Emirates are listed belowâ€"alphabetical by project name. You can browse a project profile by clicking on the project name. DEWA CSP Tower Project DEWA CSP Trough Project Shams 1(Shams 1)

  8. Concentrating Solar Power Projects - Genesis Solar Energy Project |

    Science.gov Websites

    Concentrating Solar Power | NREL Genesis Solar Energy Project This page provides information on the Genesis Solar Energy Project, a concentrating solar power (CSP) project, with data organized by background, participants, and power plant configuration. The Project includes two 125-MW units incorporating

  9. 18 CFR 801.4 - Project review.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 2 2014-04-01 2014-04-01 false Project review. 801.4... POLICIES § 801.4 Project review. (a) The Compact provides generally that no project affecting the water... project review authority regarding proposed projects in the basin coming under the review of the...

  10. 18 CFR 801.4 - Project review.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 2 2013-04-01 2012-04-01 true Project review. 801.4... POLICIES § 801.4 Project review. (a) The Compact provides generally that no project affecting the water... project review authority regarding proposed projects in the basin coming under the review of the...

  11. 18 CFR 801.4 - Project review.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 2 2012-04-01 2012-04-01 false Project review. 801.4... POLICIES § 801.4 Project review. (a) The Compact provides generally that no project affecting the water... project review authority regarding proposed projects in the basin coming under the review of the...

  12. [Consequences of a Failed Project: Introduction and Management of a Hospitalization-Substituting Treatment Model].

    PubMed

    Peters, Uwe

    2018-01-01

    This article is a report on a psychiatric project introducing services that substitute in-patient treatment and a new control and management system. The implementation of the project was a failure. Nevertheless, the project has made a contribution to further development of community-based psychiatry. Design, organization and course of the project are described and analyzed from the point of view of the communal actors involved. Effects going beyond the time course of the project have been taken into consideration. The results show that the contracting authority, project developer and local actors involved had differing ideas on the weight attached to different parts of the project as well as on the project goal and resources for carrying out the project. © Georg Thieme Verlag KG Stuttgart · New York.

  13. Faculty development projects for international health professions educators: Vehicles for institutional change?

    PubMed

    Burdick, William P; Friedman, Stacey R; Diserens, Deborah

    2012-01-01

    Projects are an important tool in faculty development, and project emphasis may offer insights into perceived education priorities. Impact of projects has been focused on individuals, not institutions or health. Education innovation projects of Fellows in an international faculty development program were examined to better understand perceived needs in health professions education and institutional impact of projects. Four hundred and thirty-five projects were analyzed to identify focus areas. Fellows were asked to identify changes in their schools and communities resulting from their projects. New education methods and curriculum change were common project focus areas. Regional differences were evident with a higher percentage of education methods projects by Fellows residing in India (52%), compared with South Africa (25%) and Brazil (24%). Fifty-six percent of projects were incorporated into the curriculum and/or incorporated as institutional policy. One-third to two-thirds of respondents noted improved teaching quality, collaboration, education research interest, assessment, student performance, and curriculum alignment with community health needs. National differences in project focus may offer insight into local conditions and needs. High rates of diffusion of projects and impact on faculty, students, and curriculum suggest that faculty development projects may be a strategy for institutional change in resource limited environments.

  14. Technology base research project for electrochemical energy storage

    NASA Astrophysics Data System (ADS)

    Kinoshita, Kim

    1988-07-01

    The progress made by the technology base research (TBR) project for electrochemical energy storage during calendar year 1987 was summarized. The primary objective of the TBR Project, which is sponsored by the Department of Energy (DOE) and managed by Lawrence Berkeley Laboratory (LBL), is to identify electrochemical technologies that can satisfy stringent performance and economic requirements for electric vehicles and stationary energy storage applications. The ultimate goal is to transfer the most promising electrochemical technologies to the private sector or to another DOE project (e.g., Sandia National Laboratories' Exploratory Technology Development and Testing Project) for further development and scale-up. Besides LBL, which has overall responsibility for the TBR Project, Los Alamos National Laboratory (LANL), Brookhaven National Laboratory (BNL) and Argonne National Laboratory (ANL) participate in the TBR Project by providing key research support in several of the project elements. The TBR Project consists of three major project elements: exploratory research; applied science research; and air systems research. The objectives and the specific battery and electrochemical systems addressed by each project element are discussed in the following sections, which also include technical summaries that relate to the individual projects. Financial information that relates to the various projects and a description of the management activities for the TBR Project are described in the Executive Summary.

  15. Implementation of a Project Management Office (PMO)--experiences from year 1.

    PubMed

    Isola, Miriam; Polikaitis, Audrius; Laureto, Rose Ann

    2006-01-01

    Recognized as an early leader in clinical information systems, the University of Illinois Medical Center was challenged to meet the ever-increasing demand for information systems. Interviews with key stakeholders revealed unfavorable attitudes toward the Information Services department. Reasons given were that projects often are not aligned with business strategy, projects are delayed, IS itself is a barrier to progress, and a lack of proactive planning precipitates crises. Under the leadership of a new CIO, IS began developing a Project Management Office, or PMO, to better meet medical center business objectives and to more effectively manage technology projects. Successes during the first year included comprehensive IT strategic planning. Collaborative relationships were established with departmental leaders for planning, prioritizing, budgeting, and executing projects. A formal Web-based process for requesting IS projects was implemented, project management training was provided, and elements of standard project management methodology were implemented. While a framework for effective project management was created, significant effort is still required to firmly root these new processes within the organizational culture. Project management office goals for the second year include implementing a project portfolio management tool, refining the benefits methodology, and continuing the advancement of the project management methodology.

  16. Identifying challenges in project consultants engagement practices

    NASA Astrophysics Data System (ADS)

    Shariffuddin, Nadia Alina Amir; Abidin, Nazirah Zainul

    2017-10-01

    Construction projects, green or conventional, involve multi-faceted disciplines engaged with the goal of delivering products i.e. building, infrastructure etc. at the best quality within stipulated budgets. For green projects, additional attention is added for environmental quality. Due to the various responsibilities and liabilities involved as well as the complexity of the construction process itself, formal engagement of multi-disciplinary professionals i.e. project consultants is required in any construction project. Poor selection of project consultants will lead to a multitude of complications resulting in delay, cost escalation, conflicts and poor quality. This paper explores the challenges that occur during the engagement of project consultants in a green project. As the engagement decision involves developers and architects, these two groups of respondents with green project backgrounds were approached qualitatively using interview technique. The challenges identified are limited experience and knowledge, consultants' fee vs. quality, green complexity, conflicts of interest, clients' extended expectation and less demand in green projects. The construction shifts to green project demands engagement of project consultants with added skills. It is expected that through the identification of challenges, better management and administration can be created which would give impact to the overall process of engagement in green projects.

  17. Requirements: Towards an understanding on why software projects fail

    NASA Astrophysics Data System (ADS)

    Hussain, Azham; Mkpojiogu, Emmanuel O. C.

    2016-08-01

    Requirement engineering is at the foundation of every successful software project. There are many reasons for software project failures; however, poorly engineered requirements process contributes immensely to the reason why software projects fail. Software project failure is usually costly and risky and could also be life threatening. Projects that undermine requirements engineering suffer or are likely to suffer from failures, challenges and other attending risks. The cost of project failures and overruns when estimated is very huge. Furthermore, software project failures or overruns pose a challenge in today's competitive market environment. It affects the company's image, goodwill, and revenue drive and decreases the perceived satisfaction of customers and clients. In this paper, requirements engineering was discussed. Its role in software projects success was elaborated. The place of software requirements process in relation to software project failure was explored and examined. Also, project success and failure factors were also discussed with emphasis placed on requirements factors as they play a major role in software projects' challenges, successes and failures. The paper relied on secondary data and empirical statistics to explore and examine factors responsible for the successes, challenges and failures of software projects in large, medium and small scaled software companies.

  18. Shared Voyage: Learning and Unlearning from Remarkable Projects

    NASA Technical Reports Server (NTRS)

    Laufer, Alexander; Post, Todd; Hoffman, Edward J.

    2005-01-01

    Shared Voyage is about four remarkable projects: the Advanced Composition Explorer (NASA), the Joint Air-to-Surface Standoff Missile (U.S. Air Force), the Pathfinder Solar-Powered Airplane (NASA), and the Advanced Medium Range Air-to-Air Missile (U.S.Air Force). Each project is presented as a case study comprised of stories collected from key members of the project teams. The stories found in the book are included with the purpose of providing an effective learning source for project management, encouraging the unlearning of outdated project management concepts, and enhancing awareness of the contexts surrounding different projects. Significantly different from project concepts found in most project management literature, Shared Voyage highlights concepts like a will to win, a results-oriented focus, and collaboration through trust. All four project teams researched in this study applied similar concepts; however, they applied them differently, tailoring them to fit the context of their own particular projects. It is clear that the one best way approach which is still the prevailing paradigm in project management literature should be replaced by a new paradigm: Even though general project management principles exist, their successful application depends on the specifics of the situation.

  19. Managing large energy and mineral resources (EMR) projects in challenging environments

    NASA Astrophysics Data System (ADS)

    Chanmeka, Arpamart

    The viability of energy mineral resources (EMR) construction projects is contingent upon the state of the world economic climate. Oil sands projects in Alberta, Canada exemplify large EMR projects that are highly sensitive to fluctuations in the world market. Alberta EMR projects are constrained by high fixed production costs and are also widely recognized as one of the most challenging construction projects to successfully deliver due to impacts from extreme weather conditions, remote locations and issues with labor availability amongst others. As indicated in many studies, these hardships strain the industry's ability to execute work efficiently, resulting in declining productivity and mounting cost and schedule overruns. Therefore, to enhance the competitiveness of Alberta EMR projects, project teams are targeting effective management strategies to enhance project performance and productivity by countering the uniquely challenging environment in Alberta. The main purpose of this research is to develop industry wide benchmarking tailored to the specific constraints and challenges of Alberta. Results support quantitative assessments and identify the root causes of project performance and ineffective field productivity problems in the heavy industry sector capital projects. Customized metrics produced from the data collected through a web-based survey instrument were used to quantitatively assess project performance in the following dimensions: cost, schedule, change, rework, safety, engineering and construction productivity and construction practices. The system enables the industry to measure project performance more accurately, get meaningful comparisons, while establishing credible norms specific to Alberta projects. Data analysis to identify the root cause of performance problems was conducted. The analysis of Alberta projects substantiated lessons of previous studies to create an improved awareness of the abilities of Alberta-based companies to manage their unique projects. This investigation also compared Alberta-based projects with U.S. projects to point out the differences in project process and management strategies under different environments. The relative impact of factors affecting construction productivity were identified and validated by the input from industry experts. The findings help improve the work processes used by companies developing projects in Alberta.

  20. Critical success factors in infrastructure projects

    NASA Astrophysics Data System (ADS)

    Zakaria, Siti Fairus; Zin, Rosli Mohamad; Mohamad, Ismail; Balubaid, Saeed; Mydin, Shaik Hussein; Mohd Rahim, E. M. Roodienyanto

    2017-11-01

    Construction of infrastructure project is different from buildings. The main difference is term of project site where infrastructure project need to command a long stretch while building mostly confine to a limited area. As such factors that are critical to infrastructure project may not be that significant to building project and vice versa. Flood mitigation can be classified under infrastructure projects under which their developments are planned by the government with the specific objective to reduce or avoid the negative effects of flood to the environment and livelihood. One of the indicators in project success is delay. The impact of project delay in construction industry is significant that it decelerates the projects implementation, specifically the government projects. This study attempted to identify and compare the success factors between infrastructure and building projects, as such comparison rarely found in the current literature. A model of flood mitigation projects' success factors was developed by merging the experts' views and reports from the existing literature. The experts' views were obtained from the responses to open-ended questions on the required fundamentals to achieve successful completion of flood mitigation projects. An affinity analysis was applied to these responses to develop the model. The developed model was then compared to the established success factors found in building project, extracted from the previous studies to identify the similarities and differences between the two models. This study would assist the government and construction players to become more effective in constructing successful flood mitigation projects for the future practice in a flood-prone country like Malaysia.

  1. Underestimation of Project Costs

    NASA Technical Reports Server (NTRS)

    Jones, Harry W.

    2015-01-01

    Large projects almost always exceed their budgets. Estimating cost is difficult and estimated costs are usually too low. Three different reasons are suggested: bad luck, overoptimism, and deliberate underestimation. Project management can usually point to project difficulty and complexity, technical uncertainty, stakeholder conflicts, scope changes, unforeseen events, and other not really unpredictable bad luck. Project planning is usually over-optimistic, so the likelihood and impact of bad luck is systematically underestimated. Project plans reflect optimism and hope for success in a supposedly unique new effort rather than rational expectations based on historical data. Past project problems are claimed to be irrelevant because "This time it's different." Some bad luck is inevitable and reasonable optimism is understandable, but deliberate deception must be condemned. In a competitive environment, project planners and advocates often deliberately underestimate costs to help gain project approval and funding. Project benefits, cost savings, and probability of success are exaggerated and key risks ignored. Project advocates have incentives to distort information and conceal difficulties from project approvers. One naively suggested cure is more openness, honesty, and group adherence to shared overall goals. A more realistic alternative is threatening overrun projects with cancellation. Neither approach seems to solve the problem. A better method to avoid the delusions of over-optimism and the deceptions of biased advocacy is to base the project cost estimate on the actual costs of a large group of similar projects. Over optimism and deception can continue beyond the planning phase and into project execution. Hard milestones based on verified tests and demonstrations can provide a reality check.

  2. Project management: importance for diagnostic laboratories.

    PubMed

    Croxatto, A; Greub, G

    2017-07-01

    The need for diagnostic laboratories to improve both quality and productivity alongside personnel shortages incite laboratory managers to constantly optimize laboratory workflows, organization, and technology. These continuous modifications of the laboratories should be conducted using efficient project and change management approaches to maximize the opportunities for successful completion of the project. This review aims at presenting a general overview of project management with an emphasis on selected critical aspects. Conventional project management tools and models, such as HERMES, described in the literature, associated personal experience, and educational courses on management have been used to illustrate this review. This review presents general guidelines of project management and highlights their importance for microbiology diagnostic laboratories. As an example, some critical aspects of project management will be illustrated with a project of automation, as experienced at the laboratories of bacteriology and hygiene of the University Hospital of Lausanne. It is important to define clearly beforehand the objective of a project, its perimeter, its costs, and its time frame including precise duration estimates of each step. Then, a project management plan including explanations and descriptions on how to manage, execute, and control the project is necessary to continuously monitor the progression of a project to achieve its defined goals. Moreover, a thorough risk analysis with contingency and mitigation measures should be performed at each phase of a project to minimize the impact of project failures. The increasing complexities of modern laboratories mean clinical microbiologists must use several management tools including project and change management to improve the outcome of major projects and activities. Copyright © 2017 The Author(s). Published by Elsevier Ltd.. All rights reserved.

  3. 34 CFR 645.21 - What assurances must an applicant include in an application?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the project's participants will be low-income individuals who are potential first-generation college... participation in a project because the student would enter the project after the 9th grade; and (4) The project will collaborate with other Federal TRIO projects, GEAR UP projects, or programs serving similar...

  4. 34 CFR 645.21 - What assurances must an applicant include in an application?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the project's participants will be low-income individuals who are potential first-generation college... participation in a project because the student would enter the project after the 9th grade; and (4) The project will collaborate with other Federal TRIO projects, GEAR UP projects, or programs serving similar...

  5. 34 CFR 645.21 - What assurances must an applicant include in an application?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the project's participants will be low-income individuals who are potential first-generation college... participation in a project because the student would enter the project after the 9th grade; and (4) The project will collaborate with other Federal TRIO projects, GEAR UP projects, or programs serving similar...

  6. Assessing the Relationship between Ethical Project Management and Information Technology Project Success

    ERIC Educational Resources Information Center

    Howell, Byron Winter

    2010-01-01

    The purpose of this quantitative study was to assess the relationship between ethical project management and information technology (IT) project success. The success of IT projects is important for organizational success, but the rate of IT projects is historically low, costing billions of dollars annually. Using four key ethical variables…

  7. 4-H Textile Science Textile Arts Projects.

    ERIC Educational Resources Information Center

    Scholl, Jan

    This packet contains three 4-H textile arts projects for students in the textile sciences area. The projects cover weaving, knitting, and crocheting. Each project provides an overview of what the student will learn, what materials are needed, and suggested projects for the area. Projects can be adapted for beginning, intermediate, or advanced…

  8. 24 CFR 92.301 - Project-specific assistance to community housing development organizations.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... participating jurisdiction determines to be customary and reasonable project preparation costs allowable under paragraph (a)(2) of this section. All costs must be related to a specific eligible project or projects. (2) Allowable costs. A loan may be provided to cover project costs necessary to determine project feasibility...

  9. 24 CFR 92.301 - Project-specific assistance to community housing development organizations.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... participating jurisdiction determines to be customary and reasonable project preparation costs allowable under paragraph (a)(2) of this section. All costs must be related to a specific eligible project or projects. (2) Allowable costs. A loan may be provided to cover project costs necessary to determine project feasibility...

  10. "Cheesy Pizza": The Pizza Project

    ERIC Educational Resources Information Center

    Gallick, Barbara; Lee, Lisa

    2009-01-01

    A class of 3- to 5-year-old children in a midwestern child care center chose to study pizza restaurants as a group project. This article discusses how the project evolved, describes the three phases of the project, and provides the teachers' reflections on the project. Photos taken during the project and children's sketches are included. (Contains…

  11. 77 FR 9232 - Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14186-000; Project No. 14197-000] Lock+ Hydro Friends Fund XXXV; FFP Project 57, LLC; Notice Announcing Preliminary Permit.... The applications were filed by Lock+ Hydro Friends Fund XXXV for Project No. 14186-000 and FFP Project...

  12. 77 FR 9915 - Lock+ Hydro Friends Fund XLIV; FFP Project 51, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-21

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14179-000; Project No. 14194-000] Lock+ Hydro Friends Fund XLIV; FFP Project 51, LLC; Notice Announcing Preliminary Permit.... The applications were filed by Lock+ Hydro Friends Fund XLIV for Project No. 14179-000 and FFP Project...

  13. 7 CFR 1291.4 - Eligible grant project.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... partners. (d) Multi-state projects that address solutions to problems that cross state boundaries are... 7 Agriculture 10 2010-01-01 2010-01-01 false Eligible grant project. 1291.4 Section 1291.4... PROGRAM-FARM BILL § 1291.4 Eligible grant project. (a) To be eligible for a grant, the project(s) must...

  14. The Four Belgian Research Projects: Introduction; The Free University of Brussels Research Project; The Ghent University Research Project; The Liege University Research Project; The Mons University Research Project

    ERIC Educational Resources Information Center

    Osterrieth, P.

    1974-01-01

    Complementary research projects on the socio-culturally disadvantaged child, conducted in four Belgium Universities under the auspices of the Bernard Van Leer Foundation, are described with respect to their basic approaches, methodology, and findings. (EH)

  15. The Eye Diagram: A New Perspective on the Project Life Cycle

    ERIC Educational Resources Information Center

    Jiang, Bin; Heiser, Daniel R.

    2004-01-01

    The project life cycle, a well-established concept in project management literature and education, is used to highlight the dynamic requirements placed on a typical project manager. As a project moves through the selection, planning, execution, and termination phases, the project manager and team are faced with different, vying areas of…

  16. 76 FR 43998 - Amnor Hydro West Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 14064-000] Amnor Hydro West... Hydropower Project (Horn Rapids Project or project). The proposed project is located on the Yakima River... upon lands or waters owned by others without the owners' express permission. The proposed project would...

  17. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 23 Highways 1 2010-04-01 2010-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  18. 40 CFR 35.935-11 - Project changes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Project changes. 35.935-11 Section 35... Project changes. (a) In addition to the notification of project changes required under § 30.900-1 of this... required for: (1) Project changes which may— (i) Substantially alter the design and scope of the project...

  19. 42 CFR 51c.203 - Project elements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Project elements. 51c.203 Section 51c.203 Public... SERVICES Grants for Planning and Developing Community Health Centers § 51c.203 Project elements. A project... community health center and the gradual assumption of operational status of the project so that the project...

  20. 42 CFR 56.203 - Project elements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Project elements. 56.203 Section 56.203 Public... SERVICES Grants for Planning and Developing Migrant Health Centers § 56.203 Project elements. A project for... gradual assumption of operational status of the project so that the project will, in the judgment of the...

  1. 42 CFR 51c.403 - Project elements.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false Project elements. 51c.403 Section 51c.403 Public... SERVICES Grants for Operating Community Health Projects § 51c.403 Project elements. A project for the operation of a community health project supported under this subpart must: (a) Meet all of the requirements...

  2. 33 CFR 241.6 - Deferred payments for certain qualifying projects.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... structural projects) five percent of total project costs and less (for all projects) any amounts for LERRD...-Federal share of a structural project = 35.0 percent (after the ability to pay adjustment, if any) of... qualifying projects. 241.6 Section 241.6 Navigation and Navigable Waters CORPS OF ENGINEERS, DEPARTMENT OF...

  3. Research to Real Life, 2006: Innovations in Deaf-Blindness

    ERIC Educational Resources Information Center

    Leslie, Gail, Ed.

    2006-01-01

    This publication presents several projects that support children who are deaf-blind. These projects are: (1) Learning To Learn; (2) Project SALUTE; (3) Project SPARKLE; (4) Bringing It All Back Home; (5) Project PRIIDE; and (6) Including Students With Deafblindness In Large Scale Assessment Systems. Each project lists components, key practices,…

  4. 42 CFR 56.203 - Project elements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Project elements. 56.203 Section 56.203 Public... SERVICES Grants for Planning and Developing Migrant Health Centers § 56.203 Project elements. A project for... gradual assumption of operational status of the project so that the project will, in the judgment of the...

  5. 42 CFR 56.203 - Project elements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Project elements. 56.203 Section 56.203 Public... SERVICES Grants for Planning and Developing Migrant Health Centers § 56.203 Project elements. A project for... gradual assumption of operational status of the project so that the project will, in the judgment of the...

  6. 24 CFR 401.474 - Project accounts.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 24 Housing and Urban Development 2 2014-04-01 2014-04-01 false Project accounts. 401.474 Section...-MARKET) Restructuring Plan § 401.474 Project accounts. (a) Accounts from other projects. The accounts listed in § 401.472(a)(1) may be used for other eligible projects only if: (1) The projects are included...

  7. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  8. 42 CFR 51c.403 - Project elements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Project elements. 51c.403 Section 51c.403 Public... SERVICES Grants for Operating Community Health Projects § 51c.403 Project elements. A project for the operation of a community health project supported under this subpart must: (a) Meet all of the requirements...

  9. 24 CFR 401.474 - Project accounts.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 2 2012-04-01 2012-04-01 false Project accounts. 401.474 Section...-MARKET) Restructuring Plan § 401.474 Project accounts. (a) Accounts from other projects. The accounts listed in § 401.472(a)(1) may be used for other eligible projects only if: (1) The projects are included...

  10. 40 CFR 35.935-11 - Project changes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 40 Protection of Environment 1 2011-07-01 2011-07-01 false Project changes. 35.935-11 Section 35... Project changes. (a) In addition to the notification of project changes required under § 30.900-1 of this... required for: (1) Project changes which may— (i) Substantially alter the design and scope of the project...

  11. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  12. 42 CFR 56.203 - Project elements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Project elements. 56.203 Section 56.203 Public... SERVICES Grants for Planning and Developing Migrant Health Centers § 56.203 Project elements. A project for... gradual assumption of operational status of the project so that the project will, in the judgment of the...

  13. 42 CFR 51c.403 - Project elements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Project elements. 51c.403 Section 51c.403 Public... SERVICES Grants for Operating Community Health Projects § 51c.403 Project elements. A project for the operation of a community health project supported under this subpart must: (a) Meet all of the requirements...

  14. 42 CFR 51c.203 - Project elements.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 1 2014-10-01 2014-10-01 false Project elements. 51c.203 Section 51c.203 Public... SERVICES Grants for Planning and Developing Community Health Centers § 51c.203 Project elements. A project... community health center and the gradual assumption of operational status of the project so that the project...

  15. 42 CFR 51c.203 - Project elements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Project elements. 51c.203 Section 51c.203 Public... SERVICES Grants for Planning and Developing Community Health Centers § 51c.203 Project elements. A project... community health center and the gradual assumption of operational status of the project so that the project...

  16. 23 CFR 140.606 - Project agreements.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Project agreements. 140.606 Section 140.606 Highways... Reimbursement for Bond Issue Projects § 140.606 Project agreements. Project Agreements, Form PR-2, shall be... projects. 1 The text of FHWA Form PR-2 is found in 23 CFR part 630, subpart C, appendix A. ...

  17. 42 CFR 51c.403 - Project elements.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 1 2011-10-01 2011-10-01 false Project elements. 51c.403 Section 51c.403 Public... SERVICES Grants for Operating Community Health Projects § 51c.403 Project elements. A project for the operation of a community health project supported under this subpart must: (a) Meet all of the requirements...

  18. 24 CFR 401.474 - Project accounts.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 2 2013-04-01 2013-04-01 false Project accounts. 401.474 Section...-MARKET) Restructuring Plan § 401.474 Project accounts. (a) Accounts from other projects. The accounts listed in § 401.472(a)(1) may be used for other eligible projects only if: (1) The projects are included...

  19. 42 CFR 51c.403 - Project elements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Project elements. 51c.403 Section 51c.403 Public... SERVICES Grants for Operating Community Health Projects § 51c.403 Project elements. A project for the operation of a community health project supported under this subpart must: (a) Meet all of the requirements...

  20. 42 CFR 51c.203 - Project elements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Project elements. 51c.203 Section 51c.203 Public... SERVICES Grants for Planning and Developing Community Health Centers § 51c.203 Project elements. A project... community health center and the gradual assumption of operational status of the project so that the project...

  1. 42 CFR 51c.203 - Project elements.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 1 2013-10-01 2013-10-01 false Project elements. 51c.203 Section 51c.203 Public... SERVICES Grants for Planning and Developing Community Health Centers § 51c.203 Project elements. A project... community health center and the gradual assumption of operational status of the project so that the project...

  2. 42 CFR 56.203 - Project elements.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 1 2012-10-01 2012-10-01 false Project elements. 56.203 Section 56.203 Public... SERVICES Grants for Planning and Developing Migrant Health Centers § 56.203 Project elements. A project for... gradual assumption of operational status of the project so that the project will, in the judgment of the...

  3. 24 CFR 401.474 - Project accounts.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 24 Housing and Urban Development 2 2011-04-01 2011-04-01 false Project accounts. 401.474 Section...-MARKET) Restructuring Plan § 401.474 Project accounts. (a) Accounts from other projects. The accounts listed in § 401.472(a)(1) may be used for other eligible projects only if: (1) The projects are included...

  4. 40 CFR 35.935-11 - Project changes.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 40 Protection of Environment 1 2012-07-01 2012-07-01 false Project changes. 35.935-11 Section 35... Project changes. (a) In addition to the notification of project changes required under § 30.900-1 of this... required for: (1) Project changes which may— (i) Substantially alter the design and scope of the project...

  5. Critical factors for optimising skill-grade-mix based on principles of Lean Management - a qualitative substudy

    PubMed

    Inauen, Alice; Rettke, Horst; Fridrich, Annemarie; Spirig, Rebecca; Bauer, Georg F

    2017-01-01

    Background: Due to scarce resources in health care, staff deployment has to meet the demands. To optimise skill-grade-mix, a Swiss University Hospital initiated a project based on principles of Lean Management. The project team accompanied each participating nursing department and scientifically evaluated the results of the project. Aim: The aim of this qualitative sub-study was to identify critical success factors of this project. Method: In four focus groups, participants discussed their experience of the project. Recruitment was performed from departments assessing the impact of the project retrospectively either positive or critical. In addition, the degree of direct involvement in the project served as a distinguishing criterion. Results: While the degree of direct involvement in the project was not decisive, conflicting opinions and experiences appeared in the groups with more positive or critical project evaluation. Transparency, context and attitude proved critical for the project’s success. Conclusions: Project managers should ensure transparency of the project’s progress and matching of the project structure with local conditions in order to support participants in their critical or positive attitude towards the project.

  6. Performance evaluation of restaurant food waste and biowaste to biogas pilot projects in China and implications for national policy.

    PubMed

    De Clercq, Djavan; Wen, Zongguo; Fan, Fei

    2017-03-15

    The objective of this research was to conduct a performance evaluation of three food waste/biowaste-to-biogas pilot projects across 7 scenarios in China based on multi-criteria decision analysis (MCDA) methodology. The projects ranked included a food waste-biogas project in Beijing, a food waste-biogas project in Suzhou and a co-digestion project producing biomethane in Hainan. The projects were ranked from best to worst based on technical, economic and environmental criteria under the MCDA framework. The results demonstrated that some projects are encountering operational problems. Based on these findings, six national policy recommendations were provided: (1) shift away from capital investment subsidies to performance-based subsidies; (2) re-design feed in tariffs; (3) promote bio-methane and project clustering; (4) improve collection efficiency by incentivizing FW producers to direct waste to biogas projects; (5) incentivize biogas projects to produce multiple outputs; (6) incentivize food waste-based projects to co-digest food waste with other substrates for higher gas output. Copyright © 2016 Elsevier Ltd. All rights reserved.

  7. Conducting Site and Economic Renewable Energy Project Feasibility Assessments

    EPA Pesticide Factsheets

    The Toolbox for Renewable Energy Project Development's Conducting Site and Economic Renewable Energy Project Feasibility Assessments page provides tools and resources to evaluate solar project feasibility and economics that influence project development.

  8. Voting strategy for artifact reduction in digital breast tomosynthesis.

    PubMed

    Wu, Tao; Moore, Richard H; Kopans, Daniel B

    2006-07-01

    Artifacts are observed in digital breast tomosynthesis (DBT) reconstructions due to the small number of projections and the narrow angular range that are typically employed in tomosynthesis imaging. In this work, we investigate the reconstruction artifacts that are caused by high-attenuation features in breast and develop several artifact reduction methods based on a "voting strategy." The voting strategy identifies the projection(s) that would introduce artifacts to a voxel and rejects the projection(s) when reconstructing the voxel. Four approaches to the voting strategy were compared, including projection segmentation, maximum contribution deduction, one-step classification, and iterative classification. The projection segmentation method, based on segmentation of high-attenuation features from the projections, effectively reduces artifacts caused by metal and large calcifications that can be reliably detected and segmented from projections. The other three methods are based on the observation that contributions from artifact-inducing projections have higher value than those from normal projections. These methods attempt to identify the projection(s) that would cause artifacts by comparing contributions from different projections. Among the three methods, the iterative classification method provides the best artifact reduction; however, it can generate many false positive classifications that degrade the image quality. The maximum contribution deduction method and one-step classification method both reduce artifacts well from small calcifications, although the performance of artifact reduction is slightly better with the one-step classification. The combination of one-step classification and projection segmentation removes artifacts from both large and small calcifications.

  9. Collaboration in research and the influential factors in Golestan University of Medical Sciences research projects (2005-2007): an academic sample from Iran.

    PubMed

    Borghei, Afsaneh; Qorbani, Mostafa; Rezapour, Aziz; Majdzadeh, Reza; Nedjat, Saharnaz; Asayesh, Hamid; Mansourian, Morteza; Noroozi, Mahdi; Jahahgir, Fereydoon

    2013-08-01

    Number of Iranian articles published in ISI journals has increased significantly in recent years.Despite the quantitative progress, studies performed in Iran represent low collaboration in research; therefore,we decided to evaluate collaboration in Golestan University of Medical Sciences (GOUMS) research projects. In this cross-sectional study, all GOUMS research projects that had got grants from the universitybetween 2005-2007 were studied. Among 107 research projects included in our study, 102 projects were evaluatedand checklists were completed. The researcher's questionnaire was sent to the principle investigators (n=46) of the projects and eventually 40 questionnaires were collected. The review of 102 research proposals shows that 10 projects (9.8%) have been performed in collaborationwith other organizations. Scientific outputs in these projects have been more than projects which wereconfined to the university (98% compare to 68%; p= 0.04). The total cost of the projects under study was a littlemore than 300,000 US$. In just 12 projects (11.8%) a part of the cost had been provided by organizations outsidethe university. About 50% of researchers declared that they had chosen their research topic based on their"personal interest". Only 1 project was performed by the demand of nongovernmental organizations and 12 researchersreported no collaboration in their activities. This study shows that collaboration in GOUMS research projects is low. Moreover, collaborationswith governmental and nongovernmental organizations are trivial. The scientific outputs in collaborativeresearch projects are much more than other projects.

  10. The project management office: transforming healthcare in the context of a hospital redevelopment project.

    PubMed

    Richer, Marie-Claire; Marchionni, Caroline; Lavoie-Tremblay, Melanie; Aubry, Monique

    2013-01-01

    It has been shown that classifying projects into a typology allows improved allocation of resources and promotes project success. However, a typology of healthcare projects has yet to be developed. The projects encountered by the Transition Support Office at the McGill University Health Centre in Montreal, Quebec, where a major redevelopment project is under way, were classified into a typology unique to the healthcare context. Examples of the 3 project types, Process, People, and Practice, are provided to clarify the specific support strategies and context-adapted interventions that were instrumental to their success.

  11. Map projections and the Internet: Chapter 4

    USGS Publications Warehouse

    Kessler, Fritz; Battersby, Sarah E.; Finn, Michael P.; Clarke, Keith

    2017-01-01

    The field of map projections can be described as mathematical, static, and challenging. However, this description is evolving in concert with the development of the Internet. The Internet has enabled new outlets for software applications, learning, and interaction with and about map projections . This chapter examines specific ways in which the Internet has moved map projections from a relatively obscure paper-based setting to a more engaging and accessible online environment. After a brief overview of map projections, this chapter discusses four perspectives on how map projections have been integrated into the Internet. First, map projections and their role in web maps and mapping services is examined. Second, an overview of online atlases and the map projections chosen for their maps is presented. Third, new programming languages and code libraries that enable map projections to be included in mapping applications are reviewed. Fourth, the Internet has facilitated map projection education and research especially with the map reader’s comprehension and understanding of complex topics like map projection distortion is discussed.

  12. Fast Missile Boat Project Planning using CPM and What If Analysis Method

    NASA Astrophysics Data System (ADS)

    Silvianita; Firmansyah, R.; Rosyid, D. M.; Suntoyo; Chamelia, D. M.

    2018-03-01

    This paper discusses analysis of fast ship missile project planning with CPM and What If analysis.The poor performance can cause project delay and cost overruns, these two things often occur in a project management. Scheduling has an important role to control the project. Good scheduling is required because it will affect the product quality. Scheduling is useful to manage the activities so that the project completion time can be as short as possible and it is used to determine the costs of the project are in optimum condition. The alternatives that can be used to overcome the delay project namely increasing labor and equipment.Project planning can be done to determine whether the project is already in an optimum condition. Alternatives that can be used to overcome the delay in the project is to increase labor and equipment, the next is to look for the optimum solution taking into account the duration and gain of each alternative.

  13. The Contribution of Project Environmental Assessment to Assessing and Managing Cumulative Effects: Individually and Collectively Insignificant?

    PubMed

    Noble, Bram; Liu, Jialang; Hackett, Paul

    2017-04-01

    This paper explores the opportunities and constraints to project-based environmental assessment as a means to support the assessment and management of cumulative environmental effects. A case study of the hydroelectric sector is used to determine whether sufficient information is available over time through project-by-project assessments to support an adequate understanding of cumulative change. Results show inconsistency from one project to the next in terms of the components and indicators assessed, limited transfer of baseline information between project assessments over time, and the same issues and concerns being raised by review panels-even though the projects reviewed are operating in the same watershed and operated by the same proponent. Project environmental assessments must be managed, and coordinated, as part of a larger system of impact assessment, if project-by-project assessments are to provide a meaningful forum for learning and understanding cumulative change. The paper concludes with recommendations for improved project-based assessment practice in support of cumulative effects assessment and management.

  14. Research on the Investment Costs of IT Project

    NASA Astrophysics Data System (ADS)

    Zurong, Chen; Feng, Jingchun

    2018-02-01

    The investment costs of IT project are the basis of IT project management. The meaning and composition of the investment costs of IT project were analyzed in this paper, which involving the engineering cost of IT project, the other costs of IT project, reserve cost and financing interest of the construction period. On this basis, the composition and content of static investment costs and dynamic investment costs of IT project were also studied in the paper.

  15. Lessons learned from national food fortification projects: experiences from Morocco, Uzbekistan, and Vietnam.

    PubMed

    Wirth, James P; Laillou, Arnaud; Rohner, Fabian; Northrop-Clewes, Christine A; Macdonald, Barbara; Moench-Pfanner, Regina

    2012-12-01

    Fortification of staple foods has been repeatedly recommended as an effective approach to reduce micronutrient deficiencies. With the increased number of fortification projects globally, there is a need to share practical lessons learned relating to their implementation and responses to project-related and external challenges. To document the achievements, challenges, lessons learned, and management responses associated with national fortification projects in Morocco, Uzbekistan, and Vietnam. Independent end-of-project evaluations conducted for each project served as the primary data source and contain the history of and project activities undertaken for, each fortification project. Other sources, including national policy documents, project reports from the Global Alliance for Improved Nutrition (GAIN) and other stakeholders, industry assessments, and peer-reviewed articles, were used to document the current responses to challenges and future project plans. All projects had key achievements related to the development of fortification standards and the procurement of equipment for participating industry partners. Mandatory fortification of wheat flour was a key success in Morocco and Uzbekistan. Ensuring the quality of fortified foods was a common challenge experienced across the projects, as were shifts in consumption patterns and market structures. Adjustments were made to the projects' design to address the challenges faced. National fortification projects are dynamic and must be continually modified in response to specific performance issues and broader shifts in market structure and consumption patterns.

  16. Factors that enable and hinder the implementation of projects in the alcohol and other drug field.

    PubMed

    MacLean, Sarah; Berends, Lynda; Hunter, Barbara; Roberts, Bridget; Mugavin, Janette

    2012-02-01

    Few studies systematically explore elements of successful project implementation across a range of alcohol and other drug (AOD) activities. This paper provides an evidence base to inform project implementation in the AOD field. We accessed records for 127 completed projects funded by the Alcohol, Education and Rehabilitation Foundation from 2002 to 2008. An adapted realist synthesis methodology enabled us to develop categories of enablers and barriers to successful project implementation, and to identify factors statistically associated with successful project implementation, defined as meeting all funding objectives. Thematic analysis of eight case study projects allowed detailed exploration of findings. Nine enabler and 10 barrier categories were identified. Those most frequently reported as both barriers and enablers concerned partnerships with external agencies and communities, staffing and project design. Achieving supportive relationships with partner agencies and communities, employing skilled staff and implementing consumer or participant input mechanisms were statistically associated with successful project implementation. The framework described here will support development of evidence-based project funding guidelines and project performance indicators. The study provides evidence that investing project hours and resources to develop robust relationships with project partners and communities, implementing mechanisms for consumer or participant input and attracting skilled staff are legitimate and important activities, not just in themselves but because they potentially influence achievement of project funding objectives. © 2012 The Authors. ANZJPH © 2012 Public Health Association of Australia.

  17. Past Project Expo Sites

    EPA Pesticide Factsheets

    This page provides information for Project Expo sites that were featured at the LMOP Conferences in 2013 and 2014. Project Expo sites were featured as being interested in identifying project partners for the development of an LFG energy project.

  18. Georgia Deaf-Blind Pilot Project: Project EPIC. Final Report. Optional Pilot Projects for Children with Deaf-Blindness.

    ERIC Educational Resources Information Center

    Georgia State Dept. of Education, Atlanta.

    This final report describes activities and accomplishments of Project EPIC (Effective Partner Interaction in the Community), a 3-year federally supported project in Georgia to facilitate the establishment and implementation of effective educational practices with students having deaf-blindness. The project was designed to expand students' present…

  19. Correlational Study of Risk Management and Information Technology Project Success

    ERIC Educational Resources Information Center

    Gillespie, Seth J.

    2014-01-01

    Many IT projects fail despite the best efforts to keep these projects within budget, schedule, and scope. Few studies have looked at the effect of project risk management tools and techniques on project success. The primary focus of this study was to examine the extent to which utilization of project risk management processes influence project…

  20. Planning "and" Sprinting: Use of a Hybrid Project Management Methodology within a CIS Capstone Course

    ERIC Educational Resources Information Center

    Baird, Aaron; Riggins, Frederick J.

    2012-01-01

    An increasing number of information systems projects in industry are managed using hybrid project management methodologies, but this shift in project management methods is not fully represented in our CIS curriculums. CIS capstone courses often include an applied project that is managed with traditional project management methods (plan first,…

  1. The Impact of Project Management Maturity upon IT/IS Project Management Outcomes

    ERIC Educational Resources Information Center

    Carcillo, Anthony Joseph, Jr.

    2013-01-01

    Although it is assumed that increasing the institutionalization (or maturity) of project management in an organization leads to greater project success, the literature has diverse views. The purpose of this mixed methods study was to examine the correlation between project management maturity and IT/IS project outcomes. The sample consisted of two…

  2. Scaffolding Project-Based Learning with the Project Management Body of Knowledge (PMBOK[R])

    ERIC Educational Resources Information Center

    van Rooij, Shahron Williams

    2009-01-01

    This paper reports the results of a study of the extent to which processes and procedures from the discipline of project management can scaffold online project-based learning in a graduate-level instructional technology course, by facilitating intra-team interaction, enhancing project outcomes and promoting a positive project team experience. With…

  3. 77 FR 10740 - Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14269-000; 14270-000] Riverbank Hydro No. 22, LLC; FFP Project 93, LLC; Notice Announcing Preliminary Permit Drawing The... Riverbank Hydro No. 22, LLC for Project No. 14269-000, and FFP Project 93, LLC for Project No. 14270-000. \\1...

  4. Early Owner Planning Leads to Project Success

    ERIC Educational Resources Information Center

    Gainsboro, Dan

    2006-01-01

    In the vast majority of building projects, decisions made in the first 10 percent of project activity directly determine 90 percent of the final cost and schedule. When a project is poorly planned, project costs can expand beyond estimates by as much as 50 percent. Since the owner's rate of spending increases as a building project proceeds,…

  5. Fermilab History and Archives Project | Norman F. Ramsey

    Science.gov Websites

    Fermilab History and Archives Project Fermilab History and Archives Project Fermilab History and Archives Project Home About the Archives History and Archives Online Request Contact Us History & ; Archives Project Fermilab History and Archives Project Norman F. Ramsey Back to History and Archives

  6. Native American Projects and Projects Recruiting Native Americans: FY 91, FY 92, FY 93.

    ERIC Educational Resources Information Center

    Baker, Betty C.

    This document presents descriptions of projects supported by the U.S. Department of Education's Division of Personnel Preparation which prepare Native Americans to serve students with disabilities. Two types of projects are included in this listing: Native American Projects (funded for fiscal years 1991, 1992, and 1993) and Projects Recruiting…

  7. 77 FR 14775 - Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14180-000, 14193-000] Lock+ Hydro Friends Fund XLV, FFP Project 2, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLV Project No. 14180-000. 2. FFP Project 2, LLC Project No. 14193-000. Dated: March...

  8. 77 FR 12280 - Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14189-000, 14198-000] Lock+ Hydro Friends Fund XL; FFP Project 56, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XL, Project No. 14189-000. 2. FFP Project 56, LLC, Project No. 14198-000. Dated...

  9. 77 FR 9232 - Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14184-000; 14191-000] Lock+ Hydro Friends Fund XXXVIII; FFP Project 1, LLC; Notice Announcing Preliminary Permit Drawing The... filed by Lock+ Hydro Friends Fund XXXVIII for Project No. 14184-000 and FFP Project 1, LLC for Project...

  10. 77 FR 9230 - Lock+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14180-000; 14193-000] Lock+ Hydro Friends Fund XLV; FFP Project 2, LLC; Notice Announcing Preliminary Permit Drawing The Commission... filed by Lock+ Hydro Friends Fund XLV for Project No. 14180-000 and FFP Project 2, LLC for Project No...

  11. 77 FR 12280 - Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14188-00o, 14200-000] Lock+ Hydro Friends Fund XXVIII; FFP Project 59, LLC; Notice Announcing Filing Priority for Preliminary Permit.... FFP Project 59, LLC, Project No. 14200-000. 2. Lock+ Hydro Friends Fund XXXVIII, Project No. 14188-000...

  12. 77 FR 12279 - Lock+ Hydro Friends Fund XLVII FFP Project 52, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14178-000, 14190-000] Lock+ Hydro Friends Fund XLVII FFP Project 52, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLVII, Project No. 14178-000. 2. FFP Project 52, LLC, Project No. 14190-000. Dated...

  13. 77 FR 12281 - Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14187-000, 14199-000] Lock+ Hydro Friends Fund XXXIV; FFP Project 58, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XXXIV, Project No. 14187-000. 2. FFP Project 58, LLC, Project No. 14199-000. Dated...

  14. 77 FR 13318 - Lock+ Hydro Friends Fund IV, FFP Project 55, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14185-000, 14196-000] Lock+ Hydro Friends Fund IV, FFP Project 55, LLC; Notice Announcing Filing Priority for Preliminary Permit... Friends Fund IV: Project No. 14185-000. 2. FFP Project 55, LLC: Project No. 14196-000. Dated: February 29...

  15. 77 FR 12279 - Lock+ Hydro Friends Fund XLIV FFP Project 51, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14179-000, 14194-000] Lock+ Hydro Friends Fund XLIV FFP Project 51, LLC; Notice Announcing Filing Priority for Preliminary Permit...+ Hydro Friends Fund XLIV, Project No. 14179-000. 2. FFP Project 51, LLC, Project No. 14194-000. Dated...

  16. An Empirical Investigation of Pre-Project Partnering Activities on Project Performance in the Software Industry

    ERIC Educational Resources Information Center

    Proffitt, Curtis K.

    2012-01-01

    Project failure remains a challenge within the software development field especially during the early stages of the IT project development. Despite the herculean efforts by project managers and organizations to identify and offset problems, projects remain plagued with issues. If these challenges are not mitigated, to a successful degree,…

  17. Educational Project Management Instructional System. Module One. Project Management Executive Orientation.

    ERIC Educational Resources Information Center

    Cummings, C. Peter; Cook, Desmond L.

    This module is the first in a self-instructional program designed to train public school personnel in how to manage educational projects. These may include federally funded projects (such as Title I projects), court-ordered programs (such as a desegregation plan), or locally initiated projects (such as a new math program). The purpose of this…

  18. 77 FR 13318 - SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Filing Priority for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-06

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project Nos. 14298-000, 14299-000, 14301-000] SV Hydro, LLC, Coffeeville, LLC, FFP Project 99, LLC; Notice Announcing Filing Priority for... follows: 1. FFP Project 99, LLC: Project No. 14301-000. 2. SV Hydro, LLC: Project No. 14298-000. 3...

  19. 42 CFR 137.327 - May multiple projects be included in a single construction project agreement?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 42 Public Health 1 2010-10-01 2010-10-01 false May multiple projects be included in a single construction project agreement? 137.327 Section 137.327 Public Health PUBLIC HEALTH SERVICE, DEPARTMENT OF...-GOVERNANCE Construction Project Assumption Process § 137.327 May multiple projects be included in a single...

  20. Concentrating Solar Power Projects in the United States | Concentrating

    Science.gov Websites

    States are listed belowâ€"alphabetical by state, then by project name. You can browse a project profile by clicking on the project name. Arizona Maricopa Solar Project (Maricopa) Saguaro Power Plant Solana Generating Station (Solana) California Genesis Solar Energy Project Ivanpah Solar Electric

  1. Concentrating Solar Power Projects - Yumen 50MW Thermal Oil Trough CSP

    Science.gov Websites

    project | Concentrating Solar Power | NREL Thermal Oil Trough CSP project Status Date : September 28, 2016 Project Overview Project Name: Yumen 50MW Thermal Oil Trough CSP project Country: China : Thermal Oil Power Block Turbine Capacity (Gross): 50.0 MW Turbine Capacity (Net): 50.0 MW Output Type

  2. Concentrating Solar Power Projects - eLLO Solar Thermal Project |

    Science.gov Websites

    Concentrating Solar Power | NREL eLLO Solar Thermal Project This page provides information on Llo Solar Thermal Project, a concentrating solar power (CSP) project, with data organized by Name: eLLO Solar Thermal Project (Llo) Country: France Location: Llo (Pyrénées Orientales) Owner(s

  3. 34 CFR 664.3 - Who is eligible to participate in projects funded under the Fulbright-Hays Group Projects Abroad...

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... the Fulbright-Hays Group Projects Abroad Program? 664.3 Section 664.3 Education Regulations of the... EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD PROGRAM General § 664.3 Who is eligible to participate in projects funded under the Fulbright-Hays Group Projects Abroad Program? An individual is eligible to...

  4. 34 CFR 664.3 - Who is eligible to participate in projects funded under the Fulbright-Hays Group Projects Abroad...

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... the Fulbright-Hays Group Projects Abroad Program? 664.3 Section 664.3 Education Regulations of the... EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD PROGRAM General § 664.3 Who is eligible to participate in projects funded under the Fulbright-Hays Group Projects Abroad Program? An individual is eligible to...

  5. 34 CFR 664.3 - Who is eligible to participate in projects funded under the Fulbright-Hays Group Projects Abroad...

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... the Fulbright-Hays Group Projects Abroad Program? 664.3 Section 664.3 Education Regulations of the... EDUCATION FULBRIGHT-HAYS GROUP PROJECTS ABROAD PROGRAM General § 664.3 Who is eligible to participate in projects funded under the Fulbright-Hays Group Projects Abroad Program? An individual is eligible to...

  6. Innovative Project Activities in Science [From the NSTA Study of Innovative Project Activities

    ERIC Educational Resources Information Center

    Science Teacher, 1975

    1975-01-01

    Describes four projects chosen as innovative project activities in science which exhibited identification of unique or novel problems and creative approaches to their solutions. Projects included a study of fish in Lake Erie, a goat raising project, an analysis of terrestrial plant ecology and soil composition, and a study of marine and wetlands…

  7. Digital x-ray tomosynthesis with interpolated projection data for thin slab objects

    NASA Astrophysics Data System (ADS)

    Ha, S.; Yun, J.; Kim, H. K.

    2017-11-01

    In relation with a thin slab-object inspection, we propose a digital tomosynthesis reconstruction with fewer numbers of measured projections in combinations with additional virtual projections, which are produced by interpolating the measured projections. Hence we can reconstruct tomographic images with less few-view artifacts. The projection interpolation assumes that variations in cone-beam ray path-lengths through an object are negligible and the object is rigid. The interpolation is performed in the projection-space domain. Pixel values in the interpolated projection are the weighted sum of pixel values of the measured projections considering their projection angles. The experimental simulation shows that the proposed method can enhance the contrast-to-noise performance in reconstructed images while sacrificing the spatial resolving power.

  8. Methodical bases of selection and evaluation of the effectiveness of the projects of the urban territory renovation

    NASA Astrophysics Data System (ADS)

    Sizova, Evgeniya; Zhutaeva, Evgeniya; Chugunov, Andrei

    2018-03-01

    The article highlights features of processes of urban territory renovation from the perspective of a commercial entity participating in the implementation of a project. The requirements of high-rise construction projects to the entities, that carry out them, are considered. The advantages of large enterprises as participants in renovation projects are systematized, contributing to their most efficient implementation. The factors, which influence the success of the renovation projects, are presented. A method for selecting projects for implementation based on criteria grouped by qualitative characteristics and contributing to the most complete and comprehensive evaluation of the project is suggested. Patterns to prioritize and harmonize renovation projects in terms of multi-project activity of the enterprise are considered.

  9. 2018 DOE Solid-State Lighting Project Portfolio

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The 2018 Solid-State Lighting Project Portfolio provides an overview of all SSL projects that have been funded by DOE since 2000. Projects that were active during 2017 are found in the main body of this report, and all historic projects can be found in the appendix. Within these sections, project profiles are sorted by technology type (i.e., LED or OLED) and then by performer name. A profile is provided on each project. Each profile includes a brief technical description, as well as information about project partners, funding, and the research period. This report is updated annually, although the research describedmore » in the Portfolio changes periodically as new projects are initiated and existing ones are concluded.« less

  10. Algorithm for evaluating the effectiveness of a high-rise development project based on current yield

    NASA Astrophysics Data System (ADS)

    Soboleva, Elena

    2018-03-01

    The article is aimed at the issues of operational evaluation of development project efficiency in high-rise construction under the current economic conditions in Russia. The author touches the following issues: problems of implementing development projects, the influence of the operational evaluation quality of high-rise construction projects on general efficiency, assessing the influence of the project's external environment on the effectiveness of project activities under crisis conditions and the quality of project management. The article proposes the algorithm and the methodological approach to the quality management of the developer project efficiency based on operational evaluation of the current yield efficiency. The methodology for calculating the current efficiency of a development project for high-rise construction has been updated.

  11. [Research progresses of the completed pediatrics projects funded by National Natural Science Foundation of China from 2002 to 2006].

    PubMed

    Xu, Ling; Hao, Jie; Deng, Min; Xu, Yan-ying

    2009-05-01

    To understand the projects completion and research progresses in pediatrics which were funded by the National Natural Science Foundation of China (NSFC), and evaluate the accomplishment objectively and justly. The completion status of projects in pediatrics funded by department of clinical medicine II from 2002 to 2006 was analysed retrospectively, and important research achievement and outstanding development in some projects were reported. During the period between 2002 and 2006, 420 articles were published, and the average was 8.1 papers per project, which included 56 papers that were published in journals indexed by SCI (the average was 1.1 papers per project). The completion of general project was better than that of "the Young Researchers Fund" and small grant project. Ten post-doctors, 102 doctors and 109 masters were trained. Two projects were awarded with the first grade prize and another 2 with the second grade prize at the provincial and ministerial level, 4 items applied for patent and 1 was granted. These completed projects, which were mainly related to 7 of 12 subspecialties in the field of pediatrics, such as the respiratory disease, nephrology, neurology, cardiology, endocrinology, hematology, neonatology, are the major portion of the application projects and subsidized projects funded by NSFC, and achieved great research progresses. During the period between 2002 and 2006, the 52 completed projects in pediatrics showed difference in the distribution and quality of accomplishment among subspecialties and among types of supported projects; there are some gaps between pediatrics and some other clinical basic subspecialties II, this situation released the research status and problems in development of pediatrics in China. The general projects completion was good, and many projects obtained research achievements, which reflect the leading function of NSFC in pediatric research.

  12. General risks for tunnelling projects: An overview

    NASA Astrophysics Data System (ADS)

    Siang, Lee Yong; Ghazali, Farid E. Mohamed; Zainun, Noor Yasmin; Ali, Roslinda

    2017-10-01

    Tunnels are indispensable when installing new infrastructure as well as when enhancing the quality of existing urban living due to their unique characteristics and potential applications. Over the past few decades, there has been a significant increase in the building of tunnels, world-wide. Tunnelling projects are complex endeavors, and risk assessment for tunnelling projects is likewise a complex process. Risk events are often interrelated. Occurrence of a technical risk usually carries cost and schedule consequences. Schedule risks typically impact cost escalation and project overhead. One must carefully consider the likelihood of a risk's occurrence and its impact in the context of a specific set of project conditions and circumstances. A project's goals, organization, and environment impacts in the context of a specific set of project conditions and circumstances. Some projects are primarily schedule driven; other projects are primarily cost or quality driven. Whether a specific risk event is perceived fundamentally as a cost risk or a schedule risk is governed by the project-specific context. Many researchers have pointed out the significance of recognition and control of the complexity, and risks of tunnelling projects. Although all general information on a project such as estimated duration, estimated cost, and stakeholders can be obtained, it is still quite difficult to accurately understand, predict and control the overall situation and development trends of the project, leading to the risks of tunnelling projects. This paper reviews all the key risks for tunnelling projects from several case studies that have been carried out by other researchers. These risks have been identified and reviewed in this paper. As a result, the current risk management plan in tunnelling projects can be enhanced by including all these reviewed risks as key information.

  13. High-Tech Opens Doors.

    ERIC Educational Resources Information Center

    Eichleay, Kristen; Pressman, Harvey

    1987-01-01

    Exemplary projects which help disabled people use technology (particularly computers) expand their employment opportunities include: Project Entry (Seattle); Georgia Computer Programmer Project (Atlanta); Perkins Project with Industry (Watertown, Massachusetts); Project Byte (Newton Massachusetts); Technology Relevant to You (St. Louis); Special…

  14. Project Scoping Guidebook for Metropolitan Planning Organization Transportation Projects

    DOT National Transportation Integrated Search

    2017-08-01

    To obtain state and federal funding for proposed transportation projects in metropolitan areas, local governments submit project proposals to their Metropolitan Planning Organization (MPO) during the early stages of project planning. The purpose of t...

  15. AGRI Grain Power ethanol-for-fuel project feasibility-study report. Volume II. Project marketing/economic/financial/ and organization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-04-01

    The AGRI GRAIN POWER (AGP) project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. The results of marketing, economic, and financial studies are reported in this volume.« less

  16. AGRI Grain Power ethanol-for-fuel project feasibility-study report. Volume III. Project environmental/health/safety/ and socioeconomic

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1981-04-01

    The AGRI GRAIN POWER (AGP) project, hereafter referred to as the Project, was formed to evaluate the commercial viability and assess the desireability of implementing a large grain based grass-roots anhydrous ethanol fuel project to be sited near Des Moines, Iowa. This report presents the results of a Project feasibility evaluation. The Project concept is based on involving a very strong managerial, financial and technical joint venture that is extremely expert in all facets of planning and implementing a large ethanol project; on locating the ethanol project at a highly desireable site; on utilizing a proven ethanol process; and onmore » developing a Project that is well suited to market requirements, resource availability and competitive factors. This volume contains the results of the environmental, health, safety, and socio-economic studies.« less

  17. DBMS as a Tool for Project Management

    NASA Technical Reports Server (NTRS)

    Linder, H.

    1984-01-01

    Scientific objectives of crustal dynamics are listed as well as the contents of the centralized data information system for the crustal dynamics project. The system provides for project observation schedules, gives project configuration control information and project site information.

  18. Shop Projects.

    ERIC Educational Resources Information Center

    Patton, Bob

    Vocational agriculture teachers in Oklahoma prepared the shop project drawings which comprise the document. Seventy-one projects, with lists of required materials, diagrams, and measurements, are included. Construction projects fall into six categories (number of projects in parentheses): Trailers (5), racks (3), livestock production projects…

  19. Interdependence and Integration Learning in Student Project Teams: Do Team Project Assignments Achieve What We Want Them to?

    ERIC Educational Resources Information Center

    Skilton, Paul F.; Forsyth, David; White, Otis J.

    2008-01-01

    Building from research on learning in workplace project teams, the authors work forward from the idea that the principal condition enabling integration learning in student team projects is project complexity. Recognizing the challenges of developing and running complex student projects, the authors extend theory to propose that the experience of…

  20. Leadership in Project Management: A Study of the Relationship between Leadership Styles and Industry Type on Project Success

    ERIC Educational Resources Information Center

    Barrantes-Guevara, Rita I.

    2013-01-01

    Every year organizations invest billions of dollars in Information Technology (IT) projects; however, IT project success rates continue to be low. Several critical success factors are mentioned in the research literature, the leadership skills of the project manager being one of the most frequently cited in the recent project management…

  1. Shifting Engagements in Figured Worlds: Middle School Mathematics Students' Participation in an Architectural Design Project

    ERIC Educational Resources Information Center

    Jurow, A. Susan

    2005-01-01

    Project-based curricula have the potential to engage students' interests. But how do students become interested in the goals of a project? This article documents how a group of 8th-grade students participated in an architectural design project called the Antarctica Project. The project is based on the imaginary premise that students need to design…

  2. 76 FR 6612 - Lock+ Hydro Friends Fund XL; FFP Missouri 4, LLC; Allegheny 4 Hydro, LLC; Three Rivers Hydro, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-07

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13746-000; Project No. 13750-000; Project No. 13776-000; Project No. 13782-000] Lock+ Hydro Friends Fund XL; FFP Missouri 4..., LLC--Project No. 13750-000 3. Allegheny 4 Hydro, LLC--Project No. 13776-000 4. Lock+ Hydro Friends...

  3. 75 FR 75999 - Lock + Hydro Friends Fund XlVI; FFP Missouri 17, LLC; Solia 3 Hydroelectric, LLC; Three Rivers...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-07

    .... 13754-000; Project No. 13765-000; Project No. 13783-000; Project No. 13790-000] Lock + Hydro Friends..., and Motions To Intervene NOVEMBER 30, 2010. On May 18, 2010, Lock + Hydro Friends Fund XLVI, FFP... proposed Hildebrand Lock & Dam Projects: Lock+ Hydro Friends Fund XLVI's project (Project No. 13734-000...

  4. RISK MANAGEMENT USING PROJECT RECON

    DTIC Science & Technology

    2016-11-28

    Risk Management Using Project Recon UNCLASSIFIED: Distribution Statement A. Approved for public release; distribution is unlimited. Bonnie Leece... Project Recon Lead What is Project Recon? • A web-based GOTS tool designed to capture, manage, and link Risks, Issues, and Opportunities in a...centralized database. • Project Recon (formerly Risk Recon) is designed to be used by all Program Management Offices, Integrated Project Teams and any

  5. Practical Sun Power: 5 Projects to Help Free You from Depending on Any Fuel Other Than the Sun.

    ERIC Educational Resources Information Center

    Rankins, William H., III; Wilson, David A.

    This publication describes in detail projects for using solar energy; five major projects and five mini-projects. The major projects are: (1) Parabolic reflectors, both cylindrical and spherical; (2) Solar oven; (3) Hot water heater; (4) House heating; and (5) Conversion to electricity. Mini-projects investigate: (1) Solar computers; (2) Fresnel…

  6. 75 FR 11151 - Pacific Gas and Electric Company; Notice of Intent To File License Application, Filing of Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-10

    .... Name of Project: Humboldt WaveConnect Pilot Project. f. Location: The project would be located in the... Commission must include on the first page, the project name (Humboldt WaveConnect Pilot Project) and number (P-12779-005), and bear the heading ``Comments on the proposed Humboldt WaveConnect Pilot Project...

  7. Continuous Risk Management

    NASA Technical Reports Server (NTRS)

    Sabelhaus, Phil

    2002-01-01

    Risk identification is an ongoing activity that takes place during the routine project work flow. Project activities such as programmatic and technical meetings, telecons, reviews, and other forms of communication often bring to light project risks. When this occurs, we record and analyze the risk on a Risk Information Sheet. This process helps the project team identify and cope with project risks throughout the life of the project.

  8. Project management; considerations for success.

    PubMed

    Maas, Jos

    2013-01-01

    During the past two years the author was a project leader for three Information Communication Technology (ICT) security related systems projects for a newly built healthcare facility. These projects were: a CCTV system, an Access Control system and an Identity & Access Management system. During those two years he gained experiences on how to coop with ICT projects related to security and healthcare as well as some pitfalls to be contended with along the way. With this article, he shares his experiences so that colleagues can benefit from them when they are a project leaders for their health facility and need to better decide how or how not to address their project and project issues.

  9. Monitoring software development through dynamic variables

    NASA Technical Reports Server (NTRS)

    Doerflinger, Carl W.; Basili, Victor R.

    1983-01-01

    Research conducted by the Software Engineering Laboratory (SEL) on the use of dynamic variables as a tool to monitor software development is described. Project independent measures which may be used in a management tool for monitoring software development are identified. Several FORTRAN projects with similar profiles are examined. The staff was experienced in developing these types of projects. The projects developed serve similar functions. Because these projects are similar some underlying relationships exist that are invariant between projects. These relationships, once well defined, may be used to compare the development of different projects to determine whether they are evolving the same way previous projects in this environment evolved.

  10. Probabilistic population projections with migration uncertainty

    PubMed Central

    Azose, Jonathan J.; Ševčíková, Hana; Raftery, Adrian E.

    2016-01-01

    We produce probabilistic projections of population for all countries based on probabilistic projections of fertility, mortality, and migration. We compare our projections to those from the United Nations’ Probabilistic Population Projections, which uses similar methods for fertility and mortality but deterministic migration projections. We find that uncertainty in migration projection is a substantial contributor to uncertainty in population projections for many countries. Prediction intervals for the populations of Northern America and Europe are over 70% wider, whereas prediction intervals for the populations of Africa, Asia, and the world as a whole are nearly unchanged. Out-of-sample validation shows that the model is reasonably well calibrated. PMID:27217571

  11. ASK Magazine. No. 12

    NASA Technical Reports Server (NTRS)

    Laufer, Alexander (Editor); Post, Todd (Editor); Brady, Jody Lannen (Editor)

    2003-01-01

    Welcome to the Academy of Program and Project Leadership (APPL) and ASK Magazine. APPL helps NASA managers and project teams accomplish today's missions and meet tomorrow's challenges by providing performance enhancement services and tools, supporting career development programs, sponsoring knowledge sharing events and publications, and creating opportunities for project management collaboration with universities, professional associations, industry partners and other government agencies. ASK Magazine grew out of APPL's Knowledge Sharing Initiative. The stories that appear in ASK are written by the 'best of the best' project managers, primarily from NASA, but also from other government agencies and industry. These stories contain genuine nuggets of knowledge and wisdom that are transferable across projects. Who better than a project manager to help another project manager address a critical issue on a project? Big projects, smaLl projects-they're ali here in ASK. Stories in this issue include: Earthly Considerations on Mars, Getting Politically Active, Stumping for the Project, Grins & Giggles: The Launch Pad to High Performance, Transfer Wisdom Workshops: Coming to a NASA Center Near You, Project Management: The Television Show, Lessons Learned Again and Again and Again, Implementation Reviews, ASK Talks with Dr. Michael Hecht, and What Is This Fourth Dimension?.

  12. Improvement of the cost-benefit analysis algorithm for high-rise construction projects

    NASA Astrophysics Data System (ADS)

    Gafurov, Andrey; Skotarenko, Oksana; Plotnikov, Vladimir

    2018-03-01

    The specific nature of high-rise investment projects entailing long-term construction, high risks, etc. implies a need to improve the standard algorithm of cost-benefit analysis. An improved algorithm is described in the article. For development of the improved algorithm of cost-benefit analysis for high-rise construction projects, the following methods were used: weighted average cost of capital, dynamic cost-benefit analysis of investment projects, risk mapping, scenario analysis, sensitivity analysis of critical ratios, etc. This comprehensive approach helped to adapt the original algorithm to feasibility objectives in high-rise construction. The authors put together the algorithm of cost-benefit analysis for high-rise construction projects on the basis of risk mapping and sensitivity analysis of critical ratios. The suggested project risk management algorithms greatly expand the standard algorithm of cost-benefit analysis in investment projects, namely: the "Project analysis scenario" flowchart, improving quality and reliability of forecasting reports in investment projects; the main stages of cash flow adjustment based on risk mapping for better cost-benefit project analysis provided the broad range of risks in high-rise construction; analysis of dynamic cost-benefit values considering project sensitivity to crucial variables, improving flexibility in implementation of high-rise projects.

  13. Tulane/Xavier University hazardous materials in aquatic environments of the Mississippi River basin. Quarterly progress report, January 1--March 31, 1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-05-17

    The objectives of this report are to provide the necessary administrative support to assure that the scientific and educational goals of the project are obtained and to assure that all Department of Energy reporting requirements and requests are fulfilled. The grant reporting is divided into three aspects: Collaborative Cluster projects, Initiation projects and Education projects. A cluster project is one or more closely related collaborative, multidisciplinary research projects in which a group of investigators employs a synergistic approach to the solution of problems in the same general area of research. The accomplishments this quarter of eleven cluster projects are presented.more » An initial project typically involves a single investigator. The purpose of the project is to undertake pilot work, lasting no more than one year, which will lead to the successful submission of an externally-funded proposal or the development of a collaborative cluster project. The accomplishments this quarter of eleven initiation projects are presented. The education projects are designed to develop courses with emphasis on environmental studies and/or to train students in areas of environmental research.« less

  14. Technology Base Research Project for electrochemical energy storage

    NASA Astrophysics Data System (ADS)

    Kinoshita, K.

    1985-06-01

    The DOE Electrochemical Energy Storage Program is divided into two projects: (1) the exploratory technology development and testing (ETD) project and (2) the technology base research (TBR) project. The role of the TBR Project is to perform supporting research for the advanced battery systems under development by the ETD Project, and to evaluate new systems with potentially superior performance, durability and/or cost characteristics. The specific goal of the TBR Project is to identify the most promising electrochemical technologies and transfer them to industry and/or the ETD Project for further development and scale-up. This report summarizes the research, financial, and management activities relevant to the TBR Project in CY 1984. General problem areas addressed by the project include identification of new electrochemical couples for advanced batteries, determination of technical feasibility of the new couples, improvements in battery components and materials, establishment of engineering principles applicable to electrochemical energy storage and conversion, and the assessment of fuel-cell technology for transportation applications. Major emphasis is given to applied research which will lead to superior performance and lower life-cycle costs. The TBR Project is divided into three major project elements: exploratory research, applied science research, and air systems research.

  15. Designing a Successful Transportation Project: Lessons Learned from the Clean Cities American Recovery and Reinvestment Act Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelly, Kay L.; Singer, Mark R.

    The largest source of funding for alternative fuel vehicle and infrastructure projects in the U.S. Department of Energy's Clean Cities program's history came from the American Recovery and Reinvestment Act (Recovery Act). In 2009, the 25 cost-share projects totaled nearly $300 million in federal government investment. This effort included the involvement of 50 Clean Cities coalitions and their nearly 700 stakeholder partners who provided an additional $500 million in matching funds to support projects in their local communities. In total, those 25 projects established 1,380 alternative fueling stations and put more than 9,000 alternative fuel and advanced technology vehicles onmore » the road. Together, these projects displaced 154 million gasoline gallon equivalents (GGE) of petroleum and averted 254,000 tons of greenhouse gas (GHG) emissions, while supporting U.S. energy independence and contributing to regional economic development. During post-project interviews, project leaders consistently cited a number of key components - ranging from technical and logistical factors, to administrative capabilities - for accomplishing an effective and impactful project. This report summarizes the high-level project design and administrative considerations for conducting a successful transportation project.« less

  16. First-line nurse leaders' health-care change management initiatives.

    PubMed

    Macphee, Maura; Suryaprakash, Nitya

    2012-03-01

    To examine nurse leaders' change management projects within British Columbia, Canada. British Columbia Nursing Leadership Institute 2007-10 attendees worked on year-long change management initiatives/projects of importance to their respective health-care institutions. Most leaders were in first-line positions with <3 years' experience. Consenting leaders' project reports (N = 133) were content analysed for specific themes: types of projects; scope of projects (e.g. unit or local level, departmental, institutional); influence targets or key stakeholder groups targeted by the projects; leadership successes and challenges. Of study participants, 77% successfully completed their projects. Staff tool and resource development and existing services improvement were major project types. Care delivery teams were the major influence targets. Only 25% of projects were at the unit level. Many projects had broader scopes, such as institutional levels. Participants cited multiple leadership successes, including enhanced leadership styles and organizational skills. First-line nurse leaders were able to successfully manage projects beyond their traditional scope of responsibilities. The majority of projects dealt with staff needs and healthcare restructuring initiatives. Constant change is a global reality. Change management, a universal competency, must be included in leadership development programmes. © 2011 Blackwell Publishing Ltd.

  17. An assessment of adherence to basic ecological principles by payments for ecosystem service projects.

    PubMed

    Prager, C M; Varga, A; Olmsted, P; Ingram, J C; Cattau, M; Freund, C; Wynn-Grant, R; Naeem, S

    2016-08-01

    Programs and projects employing payments for ecosystem service (PES) interventions achieve their objectives by linking buyers and sellers of ecosystem services. Although PES projects are popular conservation and development interventions, little is known about their adherence to basic ecological principles. We conducted a quantitative assessment of the degree to which a global set of PES projects adhered to four ecological principles that are basic scientific considerations for any project focused on ecosystem management: collection of baseline data, identification of threats to an ecosystem service, monitoring, and attention to ecosystem dynamics or the formation of an adaptive management plan. We evaluated 118 PES projects in three markets-biodiversity, carbon, and water-compiled using websites of major conservation organizations; ecology, economic, and climate-change databases; and three scholarly databases (ISI Web of Knowledge, Web of Science, and Google Scholar). To assess adherence to ecological principles, we constructed two scientific indices (one additive [ASI] and one multiplicative [MSI]) based on our four ecological criteria and analyzed index scores by relevant project characteristics (e.g., sector, buyer, seller). Carbon-sector projects had higher ASI values (P < 0.05) than water-sector projects and marginally higher ASI scores (P < 0.1) than biodiversity-sector projects, demonstrating their greater adherence to ecological principles. Projects financed by public-private partnerships had significantly higher ASI values than projects financed by governments (P < 0.05) and marginally higher ASI values than those funded by private entities (P < 0.1). We did not detect differences in adherence to ecological principles based on the inclusion of cobenefits, the spatial extent of a project, or the size of a project's budget. These findings suggest, at this critical phase in the rapid growth of PES projects, that fundamental ecological principles should be considered more carefully in PES project design and implementation in an effort to ensure PES project viability and sustainability. © 2015 Society for Conservation Biology.

  18. Student Project in Anatomy (SPA) - Making the First Year Medical Students Responsible and Creative.

    PubMed

    Nayak, Satheesha B; Mishra, Snigdha; George, Bincy M; Kumar, Naveen

    2016-09-01

    Creativity is a combination of ones' capacity to think outside the box, the gained knowledge and the passion for creating something. It very easily and effectively provides the creator a chance to be responsible for his/her creation and acts as a confidence booster for him/her. Creativity is inherent, but needs to be polished and nurtured. If nurtured well through proper motivation, the creator excels leaps and bounds. It develops an empathetic behaviour in the creator, when he allows his creations to be used by others. The study was done to generate learning resources through academically good students and make them available for the entire class. Academically, top 16 students were involved in a project of their choice. The projects included preparation of question answers, powerpoint presentations, cross-word puzzles, videos, models, atlases and wall hangers etc., ten weeks were given to finish the project. The project was guided and monitored by teachers. The end product of the project was given to the entire class for use. The perception of users of the end products of the projects was recorded through mini interviews. All the students who took part in the project liked working on the project. They felt motivated, rewarded and had mastery on the topic which they used in the project. The students who did not do the project but used the end product of the project also liked the project work. They felt that the end products of the projects were simple, informative and creative. By participating in Student Project in Anatomy (SPA), the students get to show their total potential through these creative ways. It provides a fresh and welcome change from the common routine followed otherwise in medical schools. The outcome of the projects can help the entire class. This type of projects can be easily tailored into existing curriculum and in disciplines other than anatomy too.

  19. Project-Based Teaching: Helping Students Make Project Connections

    NASA Astrophysics Data System (ADS)

    Johnson, Heather Jo Pusich

    Project-based curriculum materials are designed to support students in engaging with scientific content and practices in meaningful ways, with the goal of improving students' science learning. However, students need to understand the connections between what they are doing on a day-to-day basis with respect to the goals of the overall project for students to get the motivational and cognitive benefits of a project-based approach. In this dissertation, I looked at the challenges that four ninth grade science teachers faced as they helped students to make these connections using a project-based environmental science curriculum. The analysis revealed that in general when the curriculum materials made connections explicit, teachers were better able to articulate the relationship between the lesson and the project during enactment. However, whether the connections were explicit or implicit in the materials, enactments of the same lesson across teachers revealed that teachers leveraged different aspects of the project context in different ways depending on their knowledge, beliefs, and goals about project-based teaching. The quantitative analysis of student data indicated that when teacher enactments supported project goals explicitly, students made stronger connections between a lesson and the project goal. Therefore, a teacher's ability to make clear connections during classroom instruction is essential. Furthermore, when students made connections between each lesson and the larger project goals their attitudes toward the lesson were more positive and they performed better on the final assessment. These findings suggest that connections between individual lessons and the goals of the project are critical to the effectiveness of project-based learning. This study highlights that while some teachers were able to forge these connections successfully as a result of leveraging cognitive resources, teachers' beliefs, knowledge and goals about project-based teaching are variable. As such, teachers adopting project-based curriculum materials need more support - through educative curriculum materials, coaching, or ongoing professional development - to help them support project connections consistently and explicitly in their teaching practice.

  20. Modular space station Phase B extension preliminary performance specification. Volume 2: Project

    NASA Technical Reports Server (NTRS)

    1971-01-01

    The four systems of the modular space station project are described, and the interfaces between this project and the shuttle project, the tracking and data relay satellite project, and an arbitrarily defined experiment project are defined. The experiment project was synthesized from internal experiments, detached research and application modules, and attached research and application modules to derive a set of interface requirements which will support multiple combinations of these elements expected during the modular space station mission. The modular space station project element defines a 6-man orbital program capable of growth to a 12-man orbital program capability. The modular space station project element specification defines the modular space station system, the premission operations support system, the mission operations support system, and the cargo module system and their interfaces.

  1. [Administration of the "Healthy School" project].

    PubMed

    Bjegović, V; Zivković, M; Marinković, J; Vuković, D; Legetić, B

    1996-01-01

    The term of project management is commonly used to describe the work of a team that is handling a special program. In this type of management, a form of leadership which creates environment, enables fast movement of participants through different work phases achieving the common aims, is used [1-4]. The "Healthy School" Project, launched in almost all European countries, has been taking place in Yugoslavia since the end of 1991 [5]. The project developed within the country designed as a health promotion-education intervention study in primary schools. The network of 13 schools on 11 locations representing typical economic, cultural and social environments, was established to cover the country. Although the proposed methodological approach from WHO was followed [6], the specific situation in the country (economic crisis, break down of Yugoslav Federation, the war and international blockade) distated the particular modification. The management of the Healthy School Project in general, and in Yugoslavia particularly, is based upon project management structure (Scheme 1). The objective of this research was to assess the Healthy School project management in Yugoslavia, by measuring causal, intervening and output variables. In the process of assessing the management in general, three groups of criteria are commonly used: (a) causal (those that influence the course of developments in the Project), (b) intervening (representing the current condition of the internal state of the Project), and (c) output (that reflect the Project achievements). (a) For the purpose of this study the causal criteria were measured by analyzing the overall management strategy and the level of agreement in objectives of the Project itself, the Project Coordinators and main participants in the Project. (b) The intervening criteria used in this assessment were: the time spent on different project activities, the estimate of the severity of the problems in different aspects of project management, the level of personal influence on different aspects of Project development and overall work motivation and satisfaction of all participants. (c) The outcomes of the given management attempts were analyzed by the following output variables: the number of different types of meetings held, the number of seminars, mass media presentation and articles, the amount of money raised and the number of questionnaires administered. Triangular method was used to gather the data: (1) direct observation, (2) four types of questionnaires and (3) project reports and documentation. Four types of specially designed questionnaires were used to examine four groups of participants (Project Coordinators, School Project Managers, Directors and Project Co-operators). The questionnaires were different in the questions concerning examinees' project tasks and types of external communication, while the questions referring to personal characteristics, general features of the project (goals, common jobs, participation in decision making, motivation and satisfaction) were the same for all groups. The average age of the project participants was 45.50 ranging from 25 to 60 years of age. The oldest group was the group of School Directors, while the youngest were School Co-operators. The project has been run mostly by women, while men were predominantly represented in the group of School Directors. The teaching occupation is presented by 61.8%, the rest being health professionals, mostly of preventive orientation. The analysis and classification of participants goals verify that the personal goals of all participants correspond with the main Project goals. Certain groups have also some additional motives which support their successful and affective movement towards the overall Project goals. The largest problem in all groups appear to be in the field of financing the Project activities (Figure 1). (ABSTRACT TRUNCATED)

  2. Successful healthcare programs and projects: organization portfolio management essentials.

    PubMed

    Pickens, Scott; Solak, Jamie

    2005-01-01

    Many healthcare organization projects take more time and resources than planned and fail to deliver desired business outcomes. Healthcare IT is a major component of many projects and often undeservedly receives the blame for failure. Poor results are often not a result of faulty healthcare IT or poor project management or poor project execution alone. Many projects fail because of poor portfolio management--poor planning and management of the portfolio of initiatives designed to meet an organization's strategic goals. Because resources are limited, portfolio management enables organizations to more strategically allocate and manage their resources so care delivery, service delivery, and initiatives that advance organizations toward their strategic goals, including healthcare IT initiatives, can be accomplished at the levels of quality and service desired by an organization. Proper portfolio management is the essential foundation for program and project success and supports overall organization success. Without portfolio management, even programs and projects that execute flawlessly may not meet desired objectives. This article discusses the essential requirements for porfolio management. These include opportunity identification, return on investment (ROI) forecast, project prioritization, capacity planning (inclusive of human, financial, capital, and facilities resources), work scheduling, program and project management and execution, and project performance and value assessment. Portfolio management is essential to successful healthcare project execution. Theories are drawn from the Organizational Project Management Maturity Model (OPM3) work of the Project Management Institute and other leading strategy, planning, and organization change management research institutes.

  3. [Cost-effectiveness of the HIV screening program carried out in Guangxi Zhuang Autonomous Region infectious disease special demonstration project areas].

    PubMed

    Lu, Huaxiang; Luo, Liuhong; Chen, Li; Zhang, Shizhen; Liang, Yingfang; Li, Li; Chen, Zhenqiang; Huo, Xiaoxing; Wu, Xinghua

    2015-06-01

    To analyze the cost effectiveness of HIV screening project in three Guangxi infectious disease special demonstration project countries in 2013. To calculate the funds used for the HIV screening project and to study the data on HIV/AIDS and HAART. A five-tree markov model was used to evaluate the quality adjusted life year (QALY) of this HIV screening project and to analyze the related cost effectiveness of the project. The cost of HIV screening in Guangxi infectious disease special demonstration project areas was 19.205 million Yuan and having identified 1 218 HIV/AIDS patients. The average costs for HIV/AIDS positive detection in three project countries were 14.562, 18.424 and 14.042 thousand Yuan per case. The QALYs gained from finding a HIV/AIDS case were 12.736, 8.523 and 8.321 on average, with the total number of QALYs gained from the project as 5 973.184, 3 613.752 and 2 704.325. The overall cost effectiveness ratio of the project was 1.562 thousand Yuan per QALY, and 1.143, 2.162 and 1.688 thousand Yuan per QALY in these three project countries. Project country "A" showed better cost effectiveness index than country B and C. The HIV screening project in Guangxi seemed relatively cost-effective but the average cost of HIV/AIDS positive detection was expensive. To strengthen HAART work for HIV/AIDS could improve the cost-effective of the project.

  4. How to Grow Project Scientists: A Systematic Approach to Developing Project Scientists

    NASA Technical Reports Server (NTRS)

    Kea, Howard

    2011-01-01

    The Project Manager is one of the key individuals that can determine the success or failure of a project. NASA is fully committed to the training and development of Project Managers across the agency to ensure that highly capable individuals are equipped with the competencies and experience to successfully lead a project. An equally critical position is that of the Project Scientist. The Project Scientist provides the scientific leadership necessary for the scientific success of a project by insuring that the mission meets or exceeds the scientific requirements. Traditionally, NASA Goddard project scientists were appointed and approved by the Center Science Director based on their knowledge, experience, and other qualifications. However the process to obtain the necessary knowledge, skills and abilities was not documented or done in a systematic way. NASA Goddard's current Science Director, Nicholas White saw the need to create a pipeline for developing new projects scientists, and appointed a team to develop a process for training potential project scientists. The team members were Dr. Harley Thronson, Chair, Dr. Howard Kea, Mr. Mark Goldman, DACUM facilitator and the late Dr. Michael VanSteenberg. The DACUM process, an occupational analysis and evaluation system, was used to produce a picture of the project scientist's duties, tasks, knowledge, and skills. The output resulted in a 3-Day introductory course detailing all the required knowledge, skills and abilities a scientist must develop over time to be qualified for selections as a Project Scientist.

  5. Fate of protocols submitted to a French national funding scheme: a cohort study.

    PubMed

    Decullier, Evelyne; Huot, Laure; Chapuis, François R

    2014-01-01

    The fate of clinical research projects funded by a grant has been investigated, but there is no information on the projects which did not receive funding. The fate of these projects is not known: do they apply for and/or receive funding from other sources or are they carried out without specific funding? The aim of the study was to describe all clinical research projects submitted to a French national funding scheme (PHRC 2000) and to assess project initiation, completion and publication status taking into account whether or not they received funding. This study is a retrospective cohort. The initial project characteristics were retrieved from the submission files and follow-up information was collected from the primary investigator. The percentages of projects started, completed and published were studied. A total of 481 projects were studied. Follow-up information was obtained for 366. Overall, 185 projects were initiated (51%); 139 of them were funded by the PHRC 2000 or other sources. The most commonly cited reason for not initiating a project was a lack of funding. Subsequently, 121 of the projects initiated were completed (65%). Accrual difficulties were the main reason cited to explain why studies were stopped prematurely or were still ongoing. Finally, 88 of the completed projects were published (73%). Amongst the completed projects, the only factor explaining publication was the statistical significance of the results. Obtainment of funding was a determining factor for project initiation. However, once initiated, the funding did not influence completion or publication.

  6. Draft project management update to the Iowa DOT Project Development Manual : final report.

    DOT National Transportation Integrated Search

    2016-08-01

    This work supported drafting project management guidance for the Iowa Department of Transportation (DOT). The goal is to : incorporate a greater focus on project management in their project development process. : A technical advisory committee (TAC) ...

  7. 25 CFR 900.113 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... contract. This does not involve construction project management as defined in paragraph (d) of this section...) Construction project management means direct responsibility for the construction project through day-to-day on-site management and administration of the project. Activities may include cost management, project...

  8. 5 CFR 470.305 - Submission of proposals for demonstration projects.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... projects. 470.305 Section 470.305 Administrative Personnel OFFICE OF PERSONNEL MANAGEMENT CIVIL SERVICE REGULATIONS PERSONNEL MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.305 Submission of proposals for demonstration projects. (a) OPM...

  9. Concentrating Solar Power Projects in Australia | Concentrating Solar Power

    Science.gov Websites

    ‚¬"alphabetical by project name. You can browse a project profile by clicking on the project name | NREL Australia Concentrating solar power (CSP) projects in Australia are listed belowââ

  10. Large Mine Permitting - Div. of Mining, Land, and Water

    Science.gov Websites

    Pebble Project Pogo Mine Red Dog Mine Rock Creek Project True North Mine OPMP Canadian Large Projects Pebble Project Pogo Mine Red Dog Mine Rock Creek Project True North Mine Contact: Kyle Moselle Large Mine

  11. 33 CFR 203.15 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...

  12. 33 CFR 203.15 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...

  13. 33 CFR 203.15 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...

  14. 33 CFR 203.15 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... of Congress. Flood control project: A project designed and constructed to have appreciable and... Washington, D.C. Hurricane/Shore Protection Project (HSPP). A flood control project designed and constructed... project, only those components that are necessary for the flood control function are considered eligible...

  15. Preliminary assessment of potential CDM early start projects in Brazil

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Meyers, S.; Sathaye, J.; Lehman, B.

    2000-11-01

    The Brazil/US Aspen Global Forum on Climate Change Policies and Programs has facilitated a dialogue between key Brazil and US public and private sector leaders on the subject of the Clean Development Mechanism (CDM). With support from the US government, a cooperative effort between Lawrence Berkeley National Laboratory and the University of Sao Paulo conducted an assessment of a number of projects put forth by Brazilian sponsors. Initially, we gathered information and conducted a screening assessment for ten projects in the energy sector and six projects in the forestry sector. Some of the projects appeared to offer greater potential tomore » be attractive for CDM, or had better information available. We then conducted a more detailed assessment of 12 of these projects, and two other projects that were submitted after the initial screening. An important goal was to assess the potential impact of Certified Emission Reductions (CERs) on the financial performance of projects. With the exception of the two forestry-based fuel displacement projects, the impact of CERs on the internal rate of return (IRR) is fairly small. This is true for both the projects that displace grid electricity and those that displace local (diesel-based) electricity production. The relative effect of CERs is greater for projects whose IRR without CERs is low. CERs have a substantial effect on the IRR of the two short-rotation forestry energy substitution projects. One reason is that the biofuel displaces coke and oil, both of which are carbon-intensive. Another factor is that the product of these projects (charcoal and woodfuel, respectively) is relatively low value, so the revenue from carbon credits has a strong relative impact. CERs also have a substantial effect on the NPV of the carbon sequestration projects. Financial and other barriers pose a challenge for implementation of most of the projects. In most cases, the sponsor lacks sufficient capital, and loans are available only at high interest rate and with substantial guarantee. A few of the projects might go ahead without the benefit of CERs, but most probably would not. Whether the projected revenue from CERs would be sufficient to induce sponsors to proceed with the projects is an important issue that requires further investigation. All of the projects contribute to economic development in Brazil. The forestry projects in particular would create a significant number of rural jobs, and contribute income to rural communities. Some of the carbon sequestration projects would provide environmental benefits with respect to protection of biodiversity and soil.« less

  16. The Millennium Villages Project: a retrospective, observational, endline evaluation.

    PubMed

    Mitchell, Shira; Gelman, Andrew; Ross, Rebecca; Chen, Joyce; Bari, Sehrish; Huynh, Uyen Kim; Harris, Matthew W; Sachs, Sonia Ehrlich; Stuart, Elizabeth A; Feller, Avi; Makela, Susanna; Zaslavsky, Alan M; McClellan, Lucy; Ohemeng-Dapaah, Seth; Namakula, Patricia; Palm, Cheryl A; Sachs, Jeffrey D

    2018-05-01

    The Millennium Villages Project (MVP) was a 10 year, multisector, rural development project, initiated in 2005, operating across ten sites in ten sub-Saharan African countries to achieve the Millennium Development Goals (MDGs). In this study, we aimed to estimate the project's impact, target attainment, and on-site spending. In this endline evaluation of the MVP, we retrospectively selected comparison villages that best matched the project villages on possible confounding variables. Cross-sectional survey data on 40 outcomes of interest were collected from both the project and the comparison villages in 2015. Using these data, as well as on-site spending data collected during the project, we estimated project impacts as differences in outcomes between the project and comparison villages; target attainment as differences between project outcomes and prespecified targets; and on-site spending as expenditures reported by communities, donors, governments, and the project. Spending data were not collected in the comparison villages. Averaged across the ten project sites, we found that impact estimates for 30 of 40 outcomes were significant (95% uncertainty intervals [UIs] for these outcomes excluded zero) and favoured the project villages. In particular, substantial effects were seen in agriculture and health, in which some outcomes were roughly one SD better in the project villages than in the comparison villages. The project was estimated to have no significant impact on the consumption-based measures of poverty, but a significant favourable impact on an index of asset ownership. Impacts on nutrition and education outcomes were often inconclusive (95% UIs included zero). Averaging across outcomes within categories, the project had significant favourable impacts on agriculture, nutrition, education, child health, maternal health, HIV and malaria, and water and sanitation. A third of the targets were met in the project sites. Total on-site spending decreased from US$132 per person in the first half of the project (of which $66 was from the MVP) to $109 per person in the second half of the project (of which $25 was from the MVP). The MVP had favourable impacts on outcomes in all MDG areas, consistent with an integrated rural development approach. The greatest effects were in agriculture and health, suggesting support for the project's emphasis on agriculture and health systems strengthening. The project conclusively met one third of its targets. The Open Society Foundations, the Islamic Development Bank, and the governments of Japan, South Korea, Mali, Senegal, and Uganda. Copyright © 2018 The Author(s). Published by Elsevier Ltd. This is an open access article under the CC BY-NC-ND 4.0 license. Published by Elsevier Ltd.. All rights reserved.

  17. From climate-change spaghetti to climate-change distributions for 21st Century California

    USGS Publications Warehouse

    Dettinger, M.D.

    2005-01-01

    The uncertainties associated with climate-change projections for California are unlikely to disappear any time soon, and yet important long-term decisions will be needed to accommodate those potential changes. Projection uncertainties have typically been addressed by analysis of a few scenarios, chosen based on availability or to capture the extreme cases among available projections. However, by focusing on more common projections rather than the most extreme projections (using a new resampling method), new insights into current projections emerge: (1) uncertainties associated with future greenhouse-gas emissions are comparable with the differences among climate models, so that neither source of uncertainties should be neglected or underrepresented; (2) twenty-first century temperature projections spread more, overall, than do precipitation scenarios; (3) projections of extremely wet futures for California are true outliers among current projections; and (4) current projections that are warmest tend, overall, to yield a moderately drier California, while the cooler projections yield a somewhat wetter future. The resampling approach applied in this paper also provides a natural opportunity to objectively incorporate measures of model skill and the likelihoods of various emission scenarios into future assessments.

  18. Controlled Ecological Life Support System Breadboard Project - 1988

    NASA Technical Reports Server (NTRS)

    Knott, W. M.

    1989-01-01

    The Controlled Ecological Life Support System (CELSS) Breadboard Project, NASA's effort to develop the technology required to produce a functioning bioregenerative system, is discussed. The different phases of the project and its current status are described. The relationship between the project components are shown, and major project activities for fiscal years 1989-1993 are listed. The biomass production chamber to be used by the project is described.

  19. Concentrating Solar Power Projects - Parabolic Trough Projects |

    Science.gov Websites

    Project Godawari Solar Project Gujarat Solar One Gulang 100MW Thermal Oil Parabolic Trough project Guzmán Kuraymat (ISCC Kuraymat) Kathu Solar Park KaXu Solar One KVK Energy Solar Project La Africana La Dehesa La Power Facility Nevada Solar One (NSO) NOOR I NOOR II Olivenza 1 Orellana Palma del Río I Palma del Río

  20. Succesful Experience of the Project "ASTROTOP" in Israel: Space-astonomy Science education in form of independent reserch projects of pupils

    NASA Astrophysics Data System (ADS)

    Pustil'Nik, Lev

    We present more then 10 year experience of educational project in Space/Astrophysics/Environment field, realized on the base of National Science- Educational Center "Blossoms of Science" of the Jordan Valley College. Our approach is based on the natural curiosity of children as driver of their self-development from the first minutes of their life and even in adult state. This approach shift center of the weight in educational process from direct lectures, sermons, explanation from teacher to children on own attempts of children to investigate problem, what is interesting for them, by themselves (individually or in group). Our approach includes four levels of the projects: "nano-projects" for children garden and basic school (up to 10-12 years), "micro-projects" for intermediate school (12-16 years), "mini-projects" for high school (16-18 years), and "macro-projects" for the best graduates high schools and students of colleges (17-22 years). These levels and projects are interconnected one with another and sometimes participants, started on the micro-projects level in intermediate school, continue their activity up to macro-projects of the graduate's diploma level. For each level we organize courses for preparation of the teachers and instructors, interested in the using of our receipts, and published books and brochures for them. The content of our activity for different levels: a) Level of kinder gardens/basic schools- special software with interactive movie -nano-projects; b) Level of intermediate school: "Days of Science" in tens schools of Israel- first contact with astronomy; c) Summer astronomy camps (4-5 of one week camps on 200-300 pupils from all country) with introduce to astronomy and with preparation of micro-projects on themes - first successful experience of research in real science fields (hundreds projects); d) ASTROTOP - one year program of preparation of short projects, with solution on the quality level of chosen astrophysical problem - mini-projects with first experience of data acquisition, collection, critical analysis and comparison with alternative explanation (many tens projects); e) Graduate Diploma - 1.5 year real participation of students-graduates of high school in astrophysical projects in national observatories and research space centers.

  1. Science Base and Tools for Evaluating Stream Restoration Project Proposals.

    NASA Astrophysics Data System (ADS)

    Cluer, B.; Thorne, C.; Skidmore, P.; Castro, J.; Pess, G.; Beechie, T.; Shea, C.

    2008-12-01

    Stream restoration, stabilization, or enhancement projects typically employ site-specific designs and site- scale habitat improvement projects have become the default solution to many habitat problems and constraints. Such projects are often planned and implemented without thorough consideration of the broader scale problems that may be contributing to habitat degradation, attention to project resiliency to flood events, accounting for possible changes in climate or watershed land use, or ensuring the long term sustainability of the project. To address these issues, NOAA Fisheries and USFWS have collaboratively commissioned research to develop a science document and accompanying tools to support more consistent and comprehensive review of stream management and restoration projects proposals by Service staff responsible for permitting. The science document synthesizes the body of knowledge in fluvial geomorphology and presents it in a way that is accessible to the Services staff biologists, who are not trained experts in this field. Accompanying the science document are two electronic tools: a Project Information Checklist to assist in evaluating whether a proposal includes all the information necessary to allow critical and thorough project evaluation; and a Project Evaluation Tool (in flow chart format) that guides reviewers through the steps necessary to critically evaluate the quality of the information submitted, the goals and objectives of the project, project planning and development, project design, geomorphic-habitat-species relevance, and risks to listed species. Materials for training Services staff and others in the efficient use of the science document and tools have also been developed. The longer term goals of this effort include: enabling consistent and comprehensive reviews that are completed in a timely fashion by regulators; facilitating improved project planning and design by proponents; encouraging projects that are attuned to their watershed and geomorphic contexts; questioning perceived constraints on project design; reducing the use of hard structures and encouraging deformability; promoting designs that address both risk and uncertainty in applying engineering design standards; allowing for future climate and land use changes; and encouraging post-project monitoring, appraisal and project aftercare.

  2. Household survey analysis of the impact of comprehensive strategies to improve the expanded programme on immunisation at the county level in western China, 2006–2010

    PubMed Central

    Zhou, Yuqing; Xing, Yi; Liang, Xiaofeng; Yue, Chenyan; Zhu, Xu; Hipgrave, David

    2016-01-01

    Objective To evaluate interventions to improve routine vaccination coverage and caregiver knowledge in China's remote west, where routine immunisation is relatively weak. Design Prospective pre–post (2006–2010) evaluation in project counties; retrospective comparison based on 2004 administrative data at baseline and surveyed post-intervention (2010) data in selected non-project counties. Setting Four project counties and one non-project county in each of four provinces. Participants 3390 children in project counties at baseline, and 3299 in project and 830 in non-project counties post-intervention; and 3279 caregivers at baseline, and 3389 in project and 830 in non-project counties post-intervention. Intervention Multicomponent inexpensive knowledge-strengthening and service-strengthening and innovative, multisectoral engagement. Data collection Standard 30-cluster household surveys of vaccine coverage and caregiver interviews pre-intervention and post-intervention in each project county. Similar surveys in one non-project county selected by local authorities in each province post-intervention. Administrative data on vaccination coverage in non-project counties at baseline. Primary outcome measures Changes in vaccine coverage between baseline and project completion (2010); comparative caregiver knowledge in all counties in 2010. Analysis Crude (χ2) analysis of changes and differences in vaccination coverage and related knowledge. Multiple logistic regression to assess associations with timely coverage. Results Timely coverage of four routine vaccines increased by 21% (p<0.001) and hepatitis B (HepB) birth dose by 35% (p<0.001) over baseline in project counties. Comparison with non-project counties revealed secular improvement in most provinces, except new vaccine coverage was mostly higher in project counties. Ethnicity, province, birthplace, vaccination site, dual-parental out-migration and parental knowledge had significant associations with coverage. Knowledge increased for all variables but one in project counties (highest p<0.05) and was substantially higher than in non-project counties (p<0.01). Conclusions Comprehensive but inexpensive strategies improved vaccination coverage and caretaker knowledge in western China. Establishing multisectoral leadership, involving the education sector and including immunisation in public-sector performance standards, are affordable and effective interventions. PMID:26966053

  3. An assessment of people's satisfaction with the public hearing on the Yadana Natural Gas Pipeline project.

    PubMed

    Ogunlana, S; Yotsinsak, T; Yisa, S

    2001-11-01

    Many public and large-scale construction projects in Thailand have been faced with environmental and social conflict problems. The major cause is that project sponsors do not address concerns of the public in a proper manner during EIA study. The Yadana Natural Gas Pipeline (YNGP) project is an example of a project which suffered the effects of public demonstration. A public hearing, one technique of public participation, is a good mechanism to solve conflict problems in a non-violent way which the Thai Government usually adopts to settle conflict in construction projects. In the case of the YNGP, even after the conflict was 'resolved' hostility towards the project was not eliminated, as the opponents were not satisfied with the decision. Therefore, this article examines the hearing on the YNGP project. The study found that it was too late to make any significant changes to the project after the hearing was held, most respondents were not satisfied with the project. In other words, this hearing did not improve their perception of environmental soundness of the project. The study showed that the project's impact on the environment was not properly addressed. The project sponsors did not provide sufficient publicity for the meeting and the stage at which the hearing was conducted. Suggestions are made for improving participation in future hearings.

  4. Project coalitions in healthcare construction projects and the application of real options: an exploratory survey.

    PubMed

    van Reedt Dortland, Maartje; Dewulf, Geert; Voordijk, Hans

    2013-01-01

    Exploring the impact of the type of project coalition on types of flexibility by analyzing considered and exercised flexibilities in separated and integrated project coalitions in the design and construction phase and the operations and maintenance phase of a healthcare construction project. Flexibility in healthcare construction projects is increasingly needed in order to deal with growing uncertainties. Until now, little research has been carried out on how and to what extent flexibility is incorporated in different types of project coalitions chosen by healthcare organizations. An exploratory survey was conducted among health organizations in both cure and care. Questions were asked on the position of the real estate department within the organization, the type of project coalitions chosen and the rationale behind this choice, and the extent to which flexibility in terms of a real option was considered and to what extent it had been exercised in a project coalition. Integrated project coalitions pay more attention to flexibility in advance in both the process and the product, but exercise them to a lesser extent than separated project coalitions. The economic feasibility of real options is higher in integrated project coalitions. The study shows that real options thinking is already incorporated in real estate management of healthcare organizations, although more flexibility is considered in advance of the project than is actually realized during and after construction. Built environment, construction, decision making, hospitals, planning.

  5. Evaluating a collaborative IT based research and development project.

    PubMed

    Khan, Zaheer; Ludlow, David; Caceres, Santiago

    2013-10-01

    In common with all projects, evaluating an Information Technology (IT) based research and development project is necessary in order to discover whether or not the outcomes of the project are successful. However, evaluating large-scale collaborative projects is especially difficult as: (i) stakeholders from different countries are involved who, almost inevitably, have diverse technological and/or application domain backgrounds and objectives; (ii) multiple and sometimes conflicting application specific and user-defined requirements exist; and (iii) multiple and often conflicting technological research and development objectives are apparent. In this paper, we share our experiences based on the large-scale integrated research project - The HUMBOLDT project - with project duration of 54 months, involving contributions from 27 partner organisations, plus 4 sub-contractors from 14 different European countries. In the HUMBOLDT project, a specific evaluation methodology was defined and utilised for the user evaluation of the project outcomes. The user evaluation performed on the HUMBOLDT Framework and its associated nine application scenarios from various application domains, resulted in not only an evaluation of the integrated project, but also revealed the benefits and disadvantages of the evaluation methodology. This paper presents the evaluation methodology, discusses in detail the process of applying it to the HUMBOLDT project and provides an in-depth analysis of the results, which can be usefully applied to other collaborative research projects in a variety of domains. Copyright © 2013 Elsevier Ltd. All rights reserved.

  6. 23 CFR 810.304 - Submission of projects.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.304 Submission of projects. (a) An application for an urban system nonhighway public mass transit project shall...

  7. 23 CFR 810.304 - Submission of projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PUBLIC TRANSPORTATION MASS TRANSIT AND SPECIAL USE HIGHWAY PROJECTS Federal-Aid Urban System Nonhighway Public Mass Transit Projects § 810.304 Submission of projects. (a) An application for an urban system nonhighway public mass transit project shall...

  8. Concentrating Solar Power Projects in Greece | Concentrating Solar Power |

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. MINOS NREL Greece Concentrating solar power (CSP) projects in Greece are listed belowâ€"

  9. Concentrating Solar Power Projects in Saudi Arabia | Concentrating Solar

    Science.gov Websites

    belowâ€"alphabetical by project name. You can browse a project profile by clicking on the project Power | NREL Saudi Arabia Concentrating solar power (CSP) projects in Saudi Arabia are listed

  10. Concentrating Solar Power Projects in South Africa | Concentrating Solar

    Science.gov Websites

    belowâ€"alphabetical by project name. You can browse a project profile by clicking on the project Power | NREL South Africa Concentrating solar power (CSP) projects in South Africa are listed

  11. 76 FR 80907 - TRICARE Prime Urgent Care Demonstration Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-27

    ... DEPARTMENT OF DEFENSE Office of the Secretary TRICARE Prime Urgent Care Demonstration Project....S. Code, section 1092, entitled Department Of Defense TRICARE Prime Urgent Care Demonstration Project. The demonstration project is intended to test whether allowing four visits to an urgent care...

  12. 5 CFR 470.317 - Project evaluation.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 5 Administrative Personnel 1 2014-01-01 2014-01-01 false Project evaluation. 470.317 Section 470... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.317 Project evaluation. (a) Compliance evaluation. OPM will review the operation of the...

  13. 5 CFR 470.317 - Project evaluation.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 5 Administrative Personnel 1 2012-01-01 2012-01-01 false Project evaluation. 470.317 Section 470... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.317 Project evaluation. (a) Compliance evaluation. OPM will review the operation of the...

  14. Implementation of Polyurea Applications for Wastewater System Corrosion-Mitigation Projects: Final Report on Project F15-AR04

    DTIC Science & Technology

    2017-07-24

    Corrosion-Mitigation Projects Final Report on Project F15-AR04 Co ns tr uc tio n En gi ne er in g R es ea rc h La bo ra to ry Clint A. Wilson...2017 Implementation of Polyurea Applications for Wastewater System Corrosion-Mitigation Projects Final Report on Project F15-AR04 Clint A...Secretary of Defense Washington, DC 20301-3090 Under Project F15-AR04, “Polyurea Coating for Rehabilitation of Concrete and Metal Infrastructure

  15. Understanding the Manager of the Project Front-End

    NASA Technical Reports Server (NTRS)

    Mulenburg, Gerald M.; Imprescia, Cliff (Technical Monitor)

    2000-01-01

    Historical data and new findings from interviews with managers of major National Aeronautics and Space Administration (NASA) projects confirm literature reports about the criticality of the front-end phase of project development, where systems engineering plays such a key role. Recent research into the management of ten contemporary NASA projects, combined with personal experience of the author in NASA, provide some insight into the relevance and importance of the project manager in this initial part of the project life cycle. The research findings provide evidence of similar approaches taken by the NASA project manager.

  16. The integrated scheduling system: A case study in project management

    NASA Technical Reports Server (NTRS)

    Bishop, Peter C.; Learned, David B.; Yoes, Cissy A.

    1989-01-01

    A prototype project management system was developed for the Level III Project Office for the Space Station Freedom. The main goal was to establish a framework for the Space Station Project Office whereby Project and Office Managers can jointly establish and review scheduled milestones and activities. The objective was to assist office managers in communicating their objectives, milestones, schedules, and other project information more effectively and efficiently. Consideration of sophisticated project management systems was included, but each of the systems had limitations in meeting the stated objectives.

  17. Guidance and Control Software Project Data - Volume 4: Configuration Management and Quality Assurance Documents

    NASA Technical Reports Server (NTRS)

    Hayhurst, Kelly J. (Editor)

    2008-01-01

    The Guidance and Control Software (GCS) project was the last in a series of software reliability studies conducted at Langley Research Center between 1977 and 1994. The technical results of the GCS project were recorded after the experiment was completed. Some of the support documentation produced as part of the experiment, however, is serving an unexpected role far beyond its original project context. Some of the software used as part of the GCS project was developed to conform to the RTCA/DO-178B software standard, "Software Considerations in Airborne Systems and Equipment Certification," used in the civil aviation industry. That standard requires extensive documentation throughout the software development life cycle, including plans, software requirements, design and source code, verification cases and results, and configuration management and quality control data. The project documentation that includes this information is open for public scrutiny without the legal or safety implications associated with comparable data from an avionics manufacturer. This public availability has afforded an opportunity to use the GCS project documents for DO-178B training. This report provides a brief overview of the GCS project, describes the 4-volume set of documents and the role they are playing in training, and includes configuration management and quality assurance documents from the GCS project. Volume 4 contains six appendices: A. Software Accomplishment Summary for the Guidance and Control Software Project; B. Software Configuration Index for the Guidance and Control Software Project; C. Configuration Management Records for the Guidance and Control Software Project; D. Software Quality Assurance Records for the Guidance and Control Software Project; E. Problem Report for the Pluto Implementation of the Guidance and Control Software Project; and F. Support Documentation Change Reports for the Guidance and Control Software Project.

  18. Poster — Thur Eve — 01: The effect of the number of projections on MTF and CNR in Compton scatter tomography

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Chighvinadze, T; Pistorius, S; CancerCare Manitoba, Winnipeg, MB

    2014-08-15

    Purpose: To investigate the dependence of the reconstructed image quality on the number of projections in multi-projection Compton scatter tomography (MPCST). The conventional relationship between the projection number used for reconstruction and reconstructed image quality pertained to CT does not necessarily apply to MPCST, which can produce images from a single projection if the detectors have sufficiently high energy and spatial resolution. Methods: The electron density image was obtained using filtered-backprojection of the scatter signal over circular arcs formed using Compton equation. The behavior of the reconstructed image quality as a function of the projection number was evaluated through analyticalmore » simulations and characterized by CNR and MTF. Results: The increase of the projection number improves the contrast with this dependence being a function of fluence. The number of projections required to approach the asymptotic maximum contrast decreases as the fluence increases. Increasing projection number increases the CNR but not spatial resolution. Conclusions: For MPCST using a 500eV energy resolution and a 2×2mm{sup 2} size detector, an adequate image quality can be obtained with a small number of projections provided the incident fluence is high enough. This is conceptually different from conventional CT where a minimum number of projections is required to obtain an adequate image quality. While increasing projection number, even for the lowest dose value, the CNR increases even though the number of photons per projection decreases. The spatial resolution of the image is improved by increasing the sampling within a projection rather than by increasing the number of projections.« less

  19. 1991 survey of recent health sciences library building projects.

    PubMed Central

    Ludwig, L T

    1992-01-01

    Twenty health sciences libraries reported building planning, expansion, or construction of new facilities in the association's second annual survey of recent building projects. Six projects are new, freestanding structures in which the library occupies all or a major portion of the space. Six other projects are part of new construction for separately administered units in which the library is a major tenant. The final eight projects involve additions to or renovations of existing space. Seven of these twenty libraries were still in projected, predesign, or design stages of awaiting funding approval; of those seven, five were not prepared to release the requested information. Six projects are reported here as illustrative of current building projects. Images PMID:1600420

  20. Innovations in Advanced Materials and Metals Manufacturing Project (IAM2)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scott, Elizabeth

    This project, under the Jobs and Innovation Accelerator Challenge, Innovations in Advanced Materials and Metals Manufacturing Project, contracted with Cascade Energy to provide a shared energy project manager engineer to work with five different companies throughout the Portland metro grant region to implement ten energy efficiency projects and develop a case study to analyze the project model. As a part of the project, the energy project manager also looked into specific new technologies and methodologies that could change the way energy is consumed by manufacturers—from game-changing equipment and technology to monitor energy use to methodologies that change the way companiesmore » interact and use their machines to reduce energy consumption.« less

  1. The Grassmannian Atlas: A General Framework for Exploring Linear Projections of High-Dimensional Data

    DOE PAGES

    Liu, S.; Bremer, P. -T; Jayaraman, J. J.; ...

    2016-06-04

    Linear projections are one of the most common approaches to visualize high-dimensional data. Since the space of possible projections is large, existing systems usually select a small set of interesting projections by ranking a large set of candidate projections based on a chosen quality measure. However, while highly ranked projections can be informative, some lower ranked ones could offer important complementary information. Therefore, selection based on ranking may miss projections that are important to provide a global picture of the data. Here, the proposed work fills this gap by presenting the Grassmannian Atlas, a framework that captures the global structuresmore » of quality measures in the space of all projections, which enables a systematic exploration of many complementary projections and provides new insights into the properties of existing quality measures.« less

  2. FINAL PROJECT REPORT - EVALUATION AND TESTING OF HTGR REACTOR BUILDING RESPONSE TO DEPRESSURIZATION ACCIDENTS

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    ALLIANCE LIMITED, NGNP INDUSTRY

    This report provides a description of the project, summarizes each phase of the project, and ends with project conclusions. In addition, the report contains a descriptive index of the technical reports generated during the course of the project.

  3. Issues in NASA Program and Project Management: Focus on Project Planning and Scheduling

    NASA Technical Reports Server (NTRS)

    Hoffman, Edward J. (Editor); Lawbaugh, William M. (Editor)

    1997-01-01

    Topics addressed include: Planning and scheduling training for working project teams at NASA, overview of project planning and scheduling workshops, project planning at NASA, new approaches to systems engineering, software reliability assessment, and software reuse in wind tunnel control systems.

  4. Maintaining project consistency with transportation plans throughout the project life cycle with an emphasis on maintaining air quality conformity.

    DOT National Transportation Integrated Search

    2014-11-01

    This document was developed for transportation professionals responsible for project : development and has three basic goals: : 1. Define project consistency and identify the causes of project inconsistencies and the : critical junctures in the proje...

  5. 76 FR 12081 - Notice of Two-Year Continuation of Disease Management Demonstration Project for TRICARE Standard...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Management Demonstration Project for TRICARE Standard Beneficiaries AGENCY: Department of Defense. ACTION: Notice of Two-Year Continuation of Disease Management Demonstration Project for TRICARE Standard... System (MHS) demonstration project entitled ``Disease Management Demonstration Project for TRICARE...

  6. FME Senior Project Managers: A Juggling Act of Multiple Projects | Poster

    Cancer.gov

    By Peggy Pearl, Contributing Writer It was not until the 1950s that organizations in the United States began to apply project management tools and techniques to complex construction and engineering projects (http://en.m.wikipedia.org/wiki/Project_life_cycle).

  7. 75 FR 63434 - Kootenai National Forest, Lincoln County, Montana; Grizzly Vegetation and Transportation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ...; Grizzly Vegetation and Transportation Management Project AGENCY: Forest Service, USDA. [[Page 63435... Vegetation and Transportation Management Project (Grizzly Project). The Grizzly Project includes vegetation... management changes, including road decommissioning. The project is located in the Grizzly planning subunit on...

  8. An IS Project Management Course Project

    ERIC Educational Resources Information Center

    Frank, Ronald L.

    2010-01-01

    Information Systems curricula should provide project management (PM) theory, current practice, and hands-on experience. The schedule usually does not allow time in Analysis and Design courses for development oriented project management instruction other than a short introduction. Similarly, networking courses usually don't put project management…

  9. 5 CFR 470.311 - Final project approval.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... MANAGEMENT RESEARCH PROGRAMS AND DEMONSTRATIONS PROJECTS Regulatory Requirements Pertaining to Demonstration Projects § 470.311 Final project approval. (a) The Office of Personnel Management will consider all timely...) The Office of Personnel Management shall provide a copy of the final version of the project plan to...

  10. Concentrating Solar Power Projects in Algeria | Concentrating Solar Power |

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. ISCC Hassi NREL Algeria Concentrating solar power (CSP) projects in Algeria are listed belowâ€"

  11. Concentrating Solar Power Projects in Thailand | Concentrating Solar Power

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. Thai Solar | NREL Thailand Concentrating solar power (CSP) projects in Thailand are listed belowâ€"

  12. Concentrating Solar Power Projects in Israel | Concentrating Solar Power |

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. Ashalim Ashalim NREL Israel Concentrating solar power (CSP) projects in Israel are listed belowâ€"

  13. Concentrating Solar Power Projects in Egypt | Concentrating Solar Power |

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. ISCC Kuraymat NREL Egypt Concentrating solar power (CSP) projects in Egypt are listed belowâ€"

  14. Concentrating Solar Power Projects in France | Concentrating Solar Power |

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. eLLO Solar NREL France Concentrating solar power (CSP) projects in France are listed belowâ€"

  15. Concentrating Solar Power Projects in Kuwait | Concentrating Solar Power |

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. Shagaya CSP NREL Kuwait Concentrating solar power (CSP) projects in Kuwait are listed belowâ€"

  16. Concentrating Solar Power Projects in Turkey | Concentrating Solar Power |

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. Greenway CSP NREL Turkey Concentrating solar power (CSP) projects in Turkey are listed belowâ€"

  17. Concentrating Solar Power Projects in Italy | Concentrating Solar Power |

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. Archimede ASE NREL Italy Concentrating solar power (CSP) projects in Italy are listed belowâ€"

  18. Concentrating Solar Power Projects in Chile | Concentrating Solar Power |

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. Atacama-1 NREL Chile Concentrating solar power (CSP) projects in Chile are listed belowâ€"

  19. Concentrating Solar Power Projects in Mexico | Concentrating Solar Power |

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. Agua Prieta II NREL Mexico Concentrating solar power (CSP) projects in Mexico are listed belowâ€"

  20. 7 CFR 4280.149 - Requirements after project construction.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... paragraphs (a) and (b) of this section, as applicable. (a) Renewable energy projects. For renewable energy... future similar projects. (7) Actual jobs created or saved. (b) Energy efficiency improvement projects. For energy efficiency improvement projects, commencing the first full calendar year following the year...

  1. 7 CFR 4288.11 - Eligible project costs.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 15 2013-01-01 2013-01-01 false Eligible project costs. 4288.11 Section 4288.11... Eligible Biorefineries § 4288.11 Eligible project costs. Eligible project costs will be only for project related construction costs for repowering improvements associated with the equipment, installation...

  2. 7 CFR 4288.11 - Eligible project costs.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 15 2014-01-01 2014-01-01 false Eligible project costs. 4288.11 Section 4288.11... Eligible Biorefineries § 4288.11 Eligible project costs. Eligible project costs will be only for project related construction costs for repowering improvements associated with the equipment, installation...

  3. 7 CFR 4288.11 - Eligible project costs.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Eligible project costs. 4288.11 Section 4288.11... Eligible Biorefineries § 4288.11 Eligible project costs. Eligible project costs will be only for project related construction costs for repowering improvements associated with the equipment, installation...

  4. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs: (1...

  5. 76 FR 33734 - Applications for New Awards; Spinal Cord Injury Model Systems (SCIMS) Centers and SCIMS Multi...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-09

    ... Institute on Disability and Rehabilitation Research (NIDRR)-- Disability and Rehabilitation Research Projects and Centers Program-- Disability and Rehabilitation Research Projects (DRRPs) and Special Projects... Research Projects. General Disability and Rehabilitation Research Projects (DRRP) Requirements priority...

  6. 48 CFR 1301.671 - Assignment of program and project managers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... project managers. 1301.671 Section 1301.671 Federal Acquisition Regulations System DEPARTMENT OF COMMERCE..., and Responsibilities 1301.671 Assignment of program and project managers. The Department's Program and Project Manager certification program for the assignment and certification of Program and Project Managers...

  7. Project 1990: Educational Planning at the Metropolitan Level.

    ERIC Educational Resources Information Center

    Swanson, Austin D.; Lamitie, Robert E.

    This paper describes a project designed to provide educational decisionmakers with projections of and forecasts about future metropolitan conditions and problems, and information about the implications of alternative ways of solving metropolitan problems. Project components included (1) population and economic projections and forecasts, (2)…

  8. Project Panama: An International Service Project

    ERIC Educational Resources Information Center

    Aydlett, Lydia; Randolph, Mickey; Wells, Gayle

    2010-01-01

    Participation in service learning projects is a growing phenomenon at universities and colleges. Research indicates service projects are beneficial for college students and adults. There is little data investigating developmental differences in how younger versus older participants perceive the service learning process. In this project, older…

  9. 28 CFR 34.3 - Selection criteria.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... achievement of project objectives; (4) The project management structure is adequate to the successful conduct....3 Selection criteria. (a) All individual project applications will, at a minimum, be subject to... to be addressed by the project is clearly stated; (2) The objectives of the proposed project are...

  10. 28 CFR 34.3 - Selection criteria.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... achievement of project objectives; (4) The project management structure is adequate to the successful conduct....3 Selection criteria. (a) All individual project applications will, at a minimum, be subject to... to be addressed by the project is clearly stated; (2) The objectives of the proposed project are...

  11. 28 CFR 34.3 - Selection criteria.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... achievement of project objectives; (4) The project management structure is adequate to the successful conduct....3 Selection criteria. (a) All individual project applications will, at a minimum, be subject to... to be addressed by the project is clearly stated; (2) The objectives of the proposed project are...

  12. 28 CFR 34.3 - Selection criteria.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... achievement of project objectives; (4) The project management structure is adequate to the successful conduct....3 Selection criteria. (a) All individual project applications will, at a minimum, be subject to... to be addressed by the project is clearly stated; (2) The objectives of the proposed project are...

  13. 7 CFR 1486.506 - When will a project be reviewed?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false When will a project be reviewed? 1486.506 Section... Reporting, Evaluation, and Compliance § 1486.506 When will a project be reviewed? Any project or activity... after the completion of the project. ...

  14. 78 FR 60271 - Project No. 13599-001

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Project No. 13599-001] Green Power... (FPA), proposing to study the feasibility of the Lake 3160 Hydroelectric Project (project) to be.... The project would occupy about 475 acres of lands within the Tongass National Forest managed by the U...

  15. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  16. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs: (1...

  17. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 23 Highways 1 2013-04-01 2013-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  18. 23 CFR 633.206 - Project agreements.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 23 Highways 1 2014-04-01 2014-04-01 false Project agreements. 633.206 Section 633.206 Highways... CONTRACT PROVISIONS Federal-Aid Contracts (Appalachian Contracts) § 633.206 Project agreements. (a) Project agreements executed for projects under the Appalachian program shall contain the following paragraphs: (1...

  19. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 23 Highways 1 2012-04-01 2012-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  20. 23 CFR 810.102 - Eligible projects.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 23 Highways 1 2011-04-01 2011-04-01 false Eligible projects. 810.102 Section 810.102 Highways... SPECIAL USE HIGHWAY PROJECTS Highway Public Transportation Projects and Special Use Highway Facilities § 810.102 Eligible projects. Under this subpart the Federal Highway Administrator may approve on any...

  1. Comparing Life-Cycle Costs of ESPCs and Appropriations-Funded Energy Projects: An Update to the 2002 Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Shonder, John A; Hughes, Patrick; Atkin, Erica

    2006-11-01

    A study was sponsored by FEMP in 2001 - 2002 to develop methods to compare life-cycle costs of federal energy conservation projects carried out through energy savings performance contracts (ESPCs) and projects that are directly funded by appropriations. The study described in this report follows up on the original work, taking advantage of new pricing data on equipment and on $500 million worth of Super ESPC projects awarded since the end of FY 2001. The methods developed to compare life-cycle costs of ESPCs and directly funded energy projects are based on the following tasks: (1) Verify the parity of equipmentmore » prices in ESPC vs. directly funded projects; (2) Develop a representative energy conservation project; (3) Determine representative cycle times for both ESPCs and appropriations-funded projects; (4) Model the representative energy project implemented through an ESPC and through appropriations funding; and (5) Calculate the life-cycle costs for each project.« less

  2. Puerto Rico`s EcoElectrica LNG/power project marks a project financing first

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lammers, R.; Taylor, S.

    1998-02-23

    On Dec. 15, 1997, Enron International and Kenetech Energy Services achieved financial close on the $670 million EcoElectrica liquefied natural gas terminal and cogeneration project proposed for Puerto Rico. The project involves construction of a liquefied natural gas terminal, cogeneration plant, and desalination unit on the southern coast of Puerto Rico, in the Penuelas/Guayanilla area. EcoElectrica will include a 500-mw, combined-cycle cogeneration power plant fueled mainly by LNG imported from the 400 MMcfd Atlantic LNG project on the island of Trinidad. Achieving financial close on a project of this size is always a time-consuming matter and one with a numbermore » of challenges. These challenges were increased by the unique nature of both the project and its financing--no project financing had ever before been completed that combined an LNG terminal and power plant. The paper discusses the project, financing details and challenges, key investment considerations, and integrated project prospects.« less

  3. First-of-A-Kind Control Room Modernization Project Plan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Thomas, Kenneth David

    This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results andmore » documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.« less

  4. Ranking the Project Management Success Factors for Construction Project in South India

    NASA Astrophysics Data System (ADS)

    Aneesha, K.; Haridharan, M. K.

    2017-07-01

    In Today’s construction industry, to achieve a greater advantage over the firms, success of each project and efficiency is required. Effective Project Management overcomes these types of challenges. This study identifies the success factors which are important for project management in construction project success. From the literature review, 26 factors were found to be critical. Project managers, construction managers, civil engineers, contractors and site engineers were the respondents. After analyzing the data in SPSS software, the dominant factors from the regression analysis are top management support, competent project team, abilities to solve problems, realistic cost and time estimates, information/communication, competency of the project manager are the 6 factors out of 12 in 26 factors. Effective communication between stakeholders got highest priority and client involvement, good leadership, clarity of project goals got second priority. Informal communication gives better results compared to formal communications like written formats. To remove communication barrier with the stakeholders, informal communication like speaking face-to-face with the language this fits for the stakeholders.

  5. The seven habits of highly effective project managers

    NASA Astrophysics Data System (ADS)

    Warner, Mark; Summers, Richard

    2016-08-01

    Why do some astronomy projects succeed, while others fail? There are obviously many different factors that can and do influence the outcome of any given project, but one of the most prevalent characteristics among successful projects is the combined skills and qualifications of the project manager (PM) at their helms. But this begs an obvious question: what exactly makes a project manager "skilled and qualified?" Asked another way, are there common traits, philosophies, and/or techniques that the most successful PMs share, and if so, what are they? The short answer is yes, the majority successful engineering project managers have significant skills, habits, and character traits in common. The longer answer is there are at least seven of these key traits, or "habits" that many successful PMs share and, more importantly, implement within their respective projects. This paper presents these key factors, including thoughts on scope and quality management, cost and schedule control, project team structures, risk management strategies, stakeholder management, and general project execution.

  6. ASK Magazine. No. 14

    NASA Technical Reports Server (NTRS)

    Laufer, Alexander (Editor); Post, Todd (Editor); Brady, Jody Lannen (Editor)

    2003-01-01

    Academy of Program and Project Leadership (APPL) and ASK Magazine helps NASA managers and project teams accomplish today's missions and meet tomorrow's challenges by providing performance enhancement services and tools, supporting career development programs, sponsoring knowledge sharing events and publications, and creating opportunities for project management collaboration with universities, professional associations, industry partners, and other government agencies. ASK Magazine grew out of APPL's Knowledge Sharing Initiative. The stories that appear in ASK are written by the best of the best project managers, primarily from NASA, but also from other government agencies and industry. These stories contain genuine nuggets of knowledge and wisdom that are transferable across projects. Who better than a project manager to help another project manager address a critical issue on a project? Big projects, small projects - they're all here in ASK. Please direct all inquiries about ASK Magazine editorial policy to Todd Post, EduTech Ltd., 8455 Colesville Rd., Suite 930, Silver Spring, MD 20910, (301) 585-1030; or email to tpost@edutechltd.com.

  7. Industrial Technology Modernization Program. Project 28. Automation of Receiving, Receiving Inspection and Stores

    DTIC Science & Technology

    1987-06-15

    001 GENERAL DYNAMICS 00 FORT WORTH DIVISION INDUSTRIAL TECHNOLOGY MODERNIZATION PROGRAM Phase 2 Final Project Repc t JUNG 0 ?7 PROJECT 28 AUTOMATION...DYNAMICS FORT WORTH DIVISION INDUSTRIAL TECHNOLOGY MODERNIZATION PROGRAM Phase 2 Final Project Report PROJECT 28 AUTOMATION OF RECEIVING, RECEIVING...13 6 PROJECT ASSUMPTIONS 20 7 PRELIMINARY/FINAL DESIGN AND FINDINGS 21 8 SYSTEM/EQUIPMENT/MACHINING SPECIFICATIONS 37 9 VENDOR/ INDUSTRY ANALYSIS

  8. Manufacturing Methods and Technology Project Summary Reports

    DTIC Science & Technology

    1985-06-01

    Computer -Aided Design (CAD)/ Computer -Aided Manufacturing (CAM) Process for the Production of Cold Forged Gears Project 483 6121 - Robotic Welding and...Caliber Projectile Bodies Project 682 8370 - Automatic Inspection and 1-I1 Process Control of Weapons Parts Manufacturing METALS Project 181 7285 - Cast...designed for use on each project. Experience suggested that a general purpose computer interface might be designed that could be used on any project

  9. Adapting Project Management Practices to Research-Based Projects

    NASA Technical Reports Server (NTRS)

    Bahr, P.; Baker, T.; Corbin, B.; Keith, L.; Loerch, L.; Mullenax, C.; Myers, R.; Rhodes, B.; Skytland, N.

    2007-01-01

    From dealing with the inherent uncertainties in outcomes of scientific research to the lack of applicability of current NASA Procedural Requirements guidance documentation, research-based projects present challenges that require unique application of classical project management techniques. If additionally challenged by the creation of a new program transitioning from basic to applied research in a technical environment often unfamiliar with the cost and schedule constraints addressed by project management practices, such projects can find themselves struggling throughout their life cycles. Finally, supplying deliverables to a prime vehicle customer, also in the formative stage, adds further complexity to the development and management of research-based projects. The Biomedical Research and Countermeasures Projects Branch at NASA Johnson Space Center encompasses several diverse applied research-based or research-enabling projects within the newly-formed Human Research Program. This presentation will provide a brief overview of the organizational structure and environment in which these projects operate and how the projects coordinate to address and manage technical requirements. We will identify several of the challenges (cost, technical, schedule, and personnel) encountered by projects across the Branch, present case reports of actions taken and techniques implemented to deal with these challenges, and then close the session with an open forum discussion of remaining challenges and potential mitigations.

  10. Commitment of project participants to developing health care services based on the internet technology.

    PubMed

    Kouri, Pirkko; Karjalainen-Jurvelin, Ritva; Kinnunen, Juha

    2005-12-01

    When developing Information and Communication Technology (ICT), such as services for the decision-making process, skilled health care professionals with their comprehensive knowledge of patients/clients are essential contributors to the project. Careful evaluation is needed to assess the effectiveness of project management as well as to analyze the commitment of the personnel to goal attainment. In the course of the development of integrated maternity care services, the commitment of project participants (n=48) was evaluated. What factors enhanced or impaired their commitment to the project work? Questionnaire (n=80, response rate 60%) with quantitative analysis as well as open-ended questions with qualitative content analysis. Positive commitment was related to a confidential and open atmosphere during the project. The utilization of personal skills and experience was appreciated. Differences in the working principles and cultures between the participating organizations complicated fluent collaboration. To encourage commitment, a lot of attention should be paid to internal communication as well as the effective realization of project tasks. The strength of the project was the highly innovative and confidential atmosphere. The well-established project goals, the highly inspired project team, and the effective co-operation between the project manager and the core group helped to deepen overall commitment in the project.

  11. Generic project definitions for improvement of health care delivery: a case-based approach.

    PubMed

    Niemeijer, Gerard C; Does, Ronald J M M; de Mast, Jeroen; Trip, Albert; van den Heuvel, Jaap

    2011-01-01

    The purpose of this article is to create actionable knowledge, making the definition of process improvement projects in health care delivery more effective. This study is a retrospective analysis of process improvement projects in hospitals, facilitating a case-based reasoning approach to project definition. Data sources were project documentation and hospital-performance statistics of 271 Lean Six Sigma health care projects from 2002 to 2009 of general, teaching, and academic hospitals in the Netherlands and Belgium. Objectives and operational definitions of improvement projects in the sample, analyzed and structured in a uniform format and terminology. Extraction of reusable elements of earlier project definitions, presented in the form of 9 templates called generic project definitions. These templates function as exemplars for future process improvement projects, making the selection, definition, and operationalization of similar projects more efficient. Each template includes an explicated rationale, an operationalization in the form of metrics, and a prototypical example. Thus, a process of incremental and sustained learning based on case-based reasoning is facilitated. The quality of project definitions is a crucial success factor in pursuits to improve health care delivery. We offer 9 tried and tested improvement themes related to patient safety, patient satisfaction, and business-economic performance of hospitals.

  12. Research projects in family medicine funded by the European Union.

    PubMed

    Pavličević, Ivančica; Barać, Lana

    2014-01-01

    This study aimed at synthesizing funding opportunities in the field of family medicine by determining the number of family medicine projects, as well as number of project leaderships and/ or participations by each country. This was done in order to encourage inclusion of physicians in countries with underdeveloped research networks in successful research networks or to encourage them to form new ones. We searched the Community Research and Development Information Service project database in February 2013. Study covered the period from years 1992 - 2012, selecting the projects within the field of general/family medicine. The search was conducted in February 2013. First search conducted in the CORDIS database came up with a total of 466 projects. After excluding 241 projects with insufficient data, we analysed 225 remaining projects; out of those, 22 (9.8%) were in the field of family medicine and 203 (90.2%) were from other fields of medicine. Sorted by the number of projects per country, Dutch institutions had the highest involvement in family medicine projects and were partners or coordinators in 18 out of 22 selected projects (81.8%), followed by British institutions with 15 (68.8%), and Spanish with 10 projects (45.5%). Croatia was a partner in a single FP7 Health project. Research projects in family medicine funded by the European Union show significant differences between countries. Constant and high-quality international cooperation in family medicine is the prerequisite for improvement and development of scientific research and the profession. Copyright © 2014 by Academy of Sciences and Arts of Bosnia and Herzegovina.

  13. Proposed Project Selection Method for Human Support Research and Technology Development (HSR&TD)

    NASA Technical Reports Server (NTRS)

    Jones, Harry

    2005-01-01

    The purpose of HSR&TD is to deliver human support technologies to the Exploration Systems Mission Directorate (ESMD) that will be selected for future missions. This requires identifying promising candidate technologies and advancing them in technology readiness until they are acceptable. HSR&TD must select an may of technology development projects, guide them, and either terminate or continue them, so as to maximize the resulting number of usable advanced human support technologies. This paper proposes an effective project scoring methodology to support managing the HSR&TD project portfolio. Researchers strongly disagree as to what are the best technology project selection methods, or even if there are any proven ones. Technology development is risky and outstanding achievements are rare and unpredictable. There is no simple formula for success. Organizations that are satisfied with their project selection approach typically use a mix of financial, strategic, and scoring methods in an open, established, explicit, formal process. This approach helps to build consensus and develop management insight. It encourages better project proposals by clarifying the desired project attributes. We propose a project scoring technique based on a method previously used in a federal laboratory and supported by recent research. Projects are ranked by their perceived relevance, risk, and return - a new 3 R's. Relevance is the degree to which the project objective supports the HSR&TD goal of developing usable advanced human support technologies. Risk is the estimated probability that the project will achieve its specific objective. Return is the reduction in mission life cycle cost obtained if the project is successful. If the project objective technology performs a new function with no current cost, its return is the estimated cash value of performing the new function. The proposed project selection scoring method includes definitions of the criteria, a project evaluation questionnaire, and a scoring formula.

  14. Design, implementation and migration of security systems as an extreme project.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scharmer, Carol; Trujillo, David

    2010-08-01

    Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocatedmore » based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.« less

  15. Design implementation and migration of security systems as an extreme project.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Scharmer, Carol

    2010-10-01

    Decision Trees, algorithms, software code, risk management, reports, plans, drawings, change control, presentations, and analysis - all useful tools and efforts but time consuming, resource intensive, and potentially costly for projects that have absolute schedule and budget constraints. What are necessary and prudent efforts when a customer calls with a major security problem that needs to be fixed with a proven, off-the-approval-list, multi-layered integrated system with high visibility and limited funding and expires at the end of the Fiscal Year? Whether driven by budget cycles, safety, or by management decree, many such projects begin with generic scopes and funding allocatedmore » based on a rapid management 'guestimate.' Then a Project Manager (PM) is assigned a project with a predefined and potentially limited scope, compressed schedule, and potentially insufficient funding. The PM is tasked to rapidly and cost effectively coordinate a requirements-based design, implementation, test, and turnover of a fully operational system to the customer, all while the customer is operating and maintaining an existing security system. Many project management manuals call this an impossible project that should not be attempted. However, security is serious business and the reality is that rapid deployment of proven systems via an 'Extreme Project' is sometimes necessary. Extreme Projects can be wildly successful but require a dedicated team of security professionals lead by an experienced project manager using a highly-tailored and agile project management process with management support at all levels, all combined with significant interface with the customer. This paper does not advocate such projects or condone eliminating the valuable analysis and project management techniques. Indeed, having worked on a well-planned project provides the basis for experienced team members to complete Extreme Projects. This paper does, however, provide insight into what it takes for projects to be successfully implemented and accepted when completed under extreme conditions.« less

  16. Assessing the feasibility of eHealth and mHealth: a systematic review and analysis of initiatives implemented in Kenya.

    PubMed

    Njoroge, Martin; Zurovac, Dejan; Ogara, Esther A A; Chuma, Jane; Kirigia, Doris

    2017-02-10

    The growth of Information and Communication Technology in Kenya has facilitated implementation of a large number of eHealth projects in a bid to cost-effectively address health and health system challenges. This systematic review aims to provide a situational analysis of eHealth initiatives being implemented in Kenya, including an assessment of the areas of focus and geographic distribution of the health projects. The search strategy involved peer and non-peer reviewed sources of relevant information relating to projects under implementation in Kenya. The projects were examined based on strategic area of implementation, health purpose and focus, geographic location, evaluation status and thematic area. A total of 114 citations comprising 69 eHealth projects fulfilled the inclusion criteria. The eHealth projects included 47 mHealth projects, 9 health information system projects, 8 eLearning projects and 5 telemedicine projects. In terms of projects geographical distribution, 24 were executed in Nairobi whilst 15 were designed to have a national coverage but only 3 were scaled up. In terms of health focus, 19 projects were mainly on primary care, 17 on HIV/AIDS and 11 on maternal and child health (MNCH). Only 8 projects were rigorously evaluated under randomized control trials. This review discovered that there is a myriad of eHealth projects being implemented in Kenya, mainly in the mHealth strategic area and focusing mostly on primary care and HIV/AIDs. Based on our analysis, most of the projects were rarely evaluated. In addition, few projects are implemented in marginalised areas and least urbanized counties with more health care needs, notwithstanding the fact that adoption of information and communication technology should aim to improve health equity (i.e. improve access to health care particularly in remote parts of the country in order to reduce geographical inequities) and contribute to overall health systems strengthening.

  17. SU-F-I-08: CT Image Ring Artifact Reduction Based On Prior Image

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yuan, C; Qi, H; Chen, Z

    Purpose: In computed tomography (CT) system, CT images with ring artifacts will be reconstructed when some adjacent bins of detector don’t work. The ring artifacts severely degrade CT image quality. We present a useful CT ring artifacts reduction based on projection data correction, aiming at estimating the missing data of projection data accurately, thus removing the ring artifacts of CT images. Methods: The method consists of ten steps: 1) Identification of abnormal pixel line in projection sinogram; 2) Linear interpolation within the pixel line of projection sinogram; 3) FBP reconstruction using interpolated projection data; 4) Filtering FBP image using meanmore » filter; 5) Forwarding projection of filtered FBP image; 6) Subtraction forwarded projection from original projection; 7) Linear interpolation of abnormal pixel line area in the subtraction projection; 8) Adding the interpolated subtraction projection on the forwarded projection; 9) FBP reconstruction using corrected projection data; 10) Return to step 4 until the pre-set iteration number is reached. The method is validated on simulated and real data to restore missing projection data and reconstruct ring artifact-free CT images. Results: We have studied impact of amount of dead bins of CT detector on the accuracy of missing data estimation in projection sinogram. For the simulated case with a resolution of 256 by 256 Shepp-Logan phantom, three iterations are sufficient to restore projection data and reconstruct ring artifact-free images when the dead bins rating is under 30%. The dead-bin-induced artifacts are substantially reduced. More iteration number is needed to reconstruct satisfactory images while the rating of dead bins increases. Similar results were found for a real head phantom case. Conclusion: A practical CT image ring artifact correction scheme based on projection data is developed. This method can produce ring artifact-free CT images feasibly and effectively.« less

  18. Canadian pharmacy practice residents' projects: publication rates and study characteristics.

    PubMed

    Hung, Michelle; Duffett, Mark

    2013-03-01

    Research projects are a key component of pharmacy residents' education. Projects represent both a large investment of effort for each resident (up to 10 weeks over the residency year) and a large body of research (given that there are currently over 150 residency positions in Canada annually). Publication of results is a vital part of the dissemination of information gleaned from these projects. To determine the publication rate for research projects performed under the auspices of accredited English-language hospital pharmacy residency programs in Canada and to describe the study characteristics of residency projects performed in Ontario from 1999/2000 to 2008/2009. Lists of residents and project titles for the period of interest were obtained from residency coordinators. PubMed, CINAHL, the Canadian Journal of Hospital Pharmacy, and Google were searched for evidence of publication of each project identified, as an abstract or presentation at a meeting, a letter to the editor, or a full-text manuscript. The library holdings of the University of Toronto were reviewed to determine study characteristics of the Ontario residency projects. For the objective of this study relating to publication rate, 518 projects were included. The overall publication rate was 32.2% (60 [35.9%] as abstracts and 107 [64.1%] as full-text manuscripts). Publication in pharmacy-specific journals (66 [61.7%] of 107 full-text manuscripts) was more frequent than publication in non-pharmacy-specific journals. The publication rate of projects as full-text manuscripts remained stable over time. Of the 202 Ontario residency projects archived in the University of Toronto's library, most were cohort studies (83 [41.1%]), and the most common topic was efficacy and/or safety of a medication (46 [22.8%]). Most hospital pharmacy residents' projects were unpublished, and the publication rate of projects as full-text manuscripts has not increased over time. Most projects were observational studies. Increasing publication rates and creating a central database or repository of residency projects would increase the dissemination and accessibility of residents' research.

  19. Association between postgraduate year 2 residency program characteristics and primary project publication.

    PubMed

    Swanson, Joseph M; Shafeeq, Hira; Hammond, Drayton A; Li, Chenghui; Devlin, John W

    2018-03-15

    The association among residency program and research mentor characteristics, program director perceptions, and the publication of the primary research project for postgraduate year 2 (PGY2) graduates was assessed. Using a validated electronic survey, residency program directors (RPDs) of critical care PGY2 graduates were asked about primary research project publication success, program and research project mentor characteristics, and RPDs' perceptions surrounding project completion. All 55 RPDs surveyed responded; 44 (79%) reported being a research project mentor. PGY2 research project publications in 2011 and 2012 totaled 26 (37%) and 27 (35%), respectively. A significant relationship existed between research project publication and the number of residents in the program ( p < 0.01); the perception among the RPDs that research project publication is important to their employer ( p < 0.01); and the research mentor's funding source ( p = 0.04), employer ( p < 0.01), number of prior publications ( p = 0.01), and research training ( p < 0.01). Variables independently associated with the publication of 2 or more research projects versus no publications included the number of graduates in the PGY2 program (odds ratio [OR], 5.6; p < 0.01), the RPD's perception that the employer valued research project publication (OR, 10.2; p < 0.01), and the number of prior publications by the least-experienced research mentor (OR, 23.5; p = 0.01). The publication of 1 research project versus no research projects was also independently associated with the RPD's perception that the employer valued research project publication (OR, 5.1; p = 0.04). A survey of RPDs of critical care PGY2 residents found that the number of PGY2 residents, the number of publications by the least experienced research mentor, and the perception that publishing the residents' research projects is important to the employer were independently associated with publication rates of residency research projects. Copyright © 2018 by the American Society of Health-System Pharmacists, Inc. All rights reserved.

  20. Earth Science: 49 Science Fair Projects Series.

    ERIC Educational Resources Information Center

    Bonnet, Robert L.; Keen, G. Daniel

    This book offers a large collection of Earth science projects and project ideas for students, teachers, and parents. The projects described are complete but can also be used as spring boards to create expanded projects. Overviews, organizational direction, suggested hypotheses, materials, procedures, and controls are provided. The projects…

  1. Single Parent/Homemaker Project Reports.

    ERIC Educational Resources Information Center

    Kentucky State Dept. of Education, Frankfort. Office of Vocational Education.

    Annual reports, project descriptions, and various other materials are provided for 35 projects. Most of the projects focus on homemaking; some are on sex equity. Project titles include: Single Parent/Adult Homemaker Reentry Program (Ashland Community College); Career Awareness Class for the Single Parent and/or Homemaker (Cumberland Valley Health…

  2. 77 FR 76597 - Limitation on Claims against Proposed Public Transportation Projects

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-28

    ... Public Transportation Projects AGENCY: Federal Transit Administration (FTA), DOT. ACTION: Notice. SUMMARY... actions announced herein for the listed public transportation project will be barred unless the claim is... issuing certain approvals for the public transportation project listed below. The actions on this project...

  3. Critical Chain Exercises

    ERIC Educational Resources Information Center

    Doyle, John Kevin

    2010-01-01

    Critical Chains project management focuses on holding buffers at the project level vs. task level, and managing buffers as a project resource. A number of studies have shown that Critical Chain project management can significantly improve organizational schedule fidelity (i.e., improve the proportion of projects delivered on time) and reduce…

  4. Teaching Small Group Communication: The Do Good Project

    ERIC Educational Resources Information Center

    Minei, Elizabeth M.

    2016-01-01

    This paper focuses on the parameters of a semester-long project called the "Do Good" project, geared towards developing small group communication skills in undergraduate students. This project highlights participation in a social engagement project that allows students to bridge concepts learned in small group communication lectures…

  5. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 15 2010-01-01 2010-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  6. 49 CFR 633.21 - Basic requirement.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.21 Basic requirement. (a) If a project meets the definition of major capital project, the recipient shall submit a project management plan prepared in accordance with § 633.25 of this part, as a condition of Federal financial...

  7. Practical Project Management for Education and Training.

    ERIC Educational Resources Information Center

    Lockitt, Bill

    This booklet provides a succinct guide to effective management procedures, including whether and how to take on projects, estimation of costs prior to project bids, project management tools, case studies, and practical exercises for staff development activities. Chapter 1 investigates why institutions take on projects, issues involved, benefits…

  8. Concentrating Solar Power Projects in Denmark | Concentrating Solar Power |

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. Aalborg CSP-Brà NREL Denmark Concentrating solar power (CSP) projects in Denmark are listed belowâ€"

  9. Concentrating Solar Power Projects in Canada | Concentrating Solar Power |

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. City of NREL Canada Concentrating solar power (CSP) projects in Canada are listed belowâ€"

  10. Concentrating Solar Power Projects in Germany | Concentrating Solar Power |

    Science.gov Websites

    ;alphabetical by project name. You can browse a project profile by clicking on the project name. Jülich Solar NREL Germany Concentrating solar power (CSP) projects in Germany are listed belowâ€"

  11. 7 CFR 4280.149 - Requirements after project construction.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... specified in paragraphs (a) and (b) of this section, as applicable. (a) Renewable energy projects. For renewable energy projects, commencing the first full calendar year following the year in which project...) Recommendations for development of future similar projects. (7) Actual jobs created or saved. (b) Energy...

  12. 7 CFR 4280.149 - Requirements after project construction.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... specified in paragraphs (a) and (b) of this section, as applicable. (a) Renewable energy projects. For renewable energy projects, commencing the first full calendar year following the year in which project...) Recommendations for development of future similar projects. (7) Actual jobs created or saved. (b) Energy...

  13. 7 CFR 4280.149 - Requirements after project construction.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... specified in paragraphs (a) and (b) of this section, as applicable. (a) Renewable energy projects. For renewable energy projects, commencing the first full calendar year following the year in which project...) Recommendations for development of future similar projects. (7) Actual jobs created or saved. (b) Energy...

  14. 24 CFR 941.306 - Maximum project cost.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Maximum project cost. 941.306... DEVELOPMENT PUBLIC HOUSING DEVELOPMENT Application and Proposal § 941.306 Maximum project cost. (a) Calculation of maximum project cost. The maximum project cost represents the total amount of public housing...

  15. 24 CFR 941.306 - Maximum project cost.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 24 Housing and Urban Development 4 2013-04-01 2013-04-01 false Maximum project cost. 941.306... DEVELOPMENT PUBLIC HOUSING DEVELOPMENT Application and Proposal § 941.306 Maximum project cost. (a) Calculation of maximum project cost. The maximum project cost represents the total amount of public housing...

  16. Chapter 3: Design of the Saber-Tooth Project.

    ERIC Educational Resources Information Center

    Ward, Phillip

    1999-01-01

    Used data from interviews, surveys, and document analysis to describe the methods and reform processes of the Saber Tooth Project, examining selection of sites; demographics (school sites, teachers, data sources, and project assumptions); and project phases (development, planning, implementation, and support). The project's method of reform was…

  17. 24 CFR 850.151 - Project restrictions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... DISABILITIES PROGRAM) HOUSING DEVELOPMENT GRANTS Project Management § 850.151 Project restrictions. (a) Owner... 24 Housing and Urban Development 4 2012-04-01 2012-04-01 false Project restrictions. 850.151... owner shall not convert the units in the project to condominium ownership or to a form of cooperative...

  18. 7 CFR 3565.351 - Project management.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 15 2012-01-01 2012-01-01 false Project management. 3565.351 Section 3565.351... AGRICULTURE GUARANTEED RURAL RENTAL HOUSING PROGRAM Project Management § 3565.351 Project management. As a... Agency and complies with an approved management plan for the project. (b) Management plan. The lender...

  19. 49 CFR 633.21 - Basic requirement.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.21 Basic requirement. (a) If a project meets the definition of major capital project, the recipient shall submit a project management plan prepared in accordance with § 633.25 of this part, as a condition of Federal financial...

  20. 49 CFR 633.21 - Basic requirement.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF TRANSPORTATION PROJECT MANAGEMENT OVERSIGHT Project Management Plans § 633.21 Basic requirement. (a) If a project meets the definition of major capital project, the recipient shall submit a project management plan prepared in accordance with § 633.25 of this part, as a condition of Federal financial...

Top