Sample records for us bureau of reclamation

  1. Facility-Scale Solar Photovoltaic Guidebook: Bureau of Reclamation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kiatreungwattana, Kosol; VanGeet, Otto; Stoltenberg, Blaise

    2016-09-01

    This guidebook was written for the U.S. Bureau of Reclamation to explore the use of non-hydro renewable energy resources to meet the U.S. Department of Interior's objectives and Reclamation's mission. This guidebook presents readers with the processes and steps needed to assess and successfully implement facility-scale solar projects.

  2. 76 FR 58035 - Notice of Inventory Completion: U.S. Department of the Interior, Bureau of Reclamation, Phoenix...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-19

    .... Department of the Interior, Bureau of Reclamation, Phoenix Area Office, Phoenix, AZ and Arizona State Museum... Bureau of Reclamation, Phoenix Area Office and Arizona State Museum have completed an inventory of a... in the physical custody of the Arizona State Museum, University of Arizona, Tucson, AZ. The human...

  3. 52. Photographic copy of construction drawing, U.S. Reclamation Service, December ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    52. Photographic copy of construction drawing, U.S. Reclamation Service, December 1911 (original drawing located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "Keechelus Dam - general plan of dam site." - Keechelus Dam, Yakima River, 10 miles northwest of Easton, Easton, Kittitas County, WA

  4. 51. Photographic copy of construction drawing, U.S. Reclamation Service, August ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. Photographic copy of construction drawing, U.S. Reclamation Service, August 1906 (original drawing located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "Crib dam at Lake Keechelus." - Keechelus Dam, Yakima River, 10 miles northwest of Easton, Easton, Kittitas County, WA

  5. Bureau of Reclamation Hydropower Lease of Power Privilege: Case Studies and Considerations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Curtis, Taylor L.; Levine, Aaron L.; McLaughlin, Kathleen

    This report analyzes the U.S. Bureau of Reclamation's (Reclamation) lease of power privilege (LOPP) regulatory process for a nonfederal entity to use a Reclamation jurisdictional dam or conduit for power generation. Recent federal initiatives encouraging hydropower development at federally-owned facilities coupled with Reclamation's hydroelectric potential has led to an increased interest in powering Reclamation dams and conduits through the LOPP process. During the last five years, 23 of the 36 total LOPP projects (76 MW) have been initiated and are at some phase of the development process. Resource assessments analyzed in this report identify over 360 MW of hydroelectric potentialmore » at Reclamation-owned dams and conduits. This report provides considerations from Reclamation staff involved in the LOPP regulatory process and developers that have received an LOPP and are currently generating hydropower at a Reclamation dam or conduit. The authors also analyze LOPP regulatory processing timelines before and after the implementation of federal initiatives to streamline the LOPP process and provide case studies of hydropower projects that have obtained an LOPP.« less

  6. 78 FR 28894 - Public Land Order No. 7814; Partial Revocation of Bureau of Reclamation Order Dated July 11, 1955...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... DEPARTMENT OF THE INTERIOR Bureau of Land Management [NEW 149341 and NEW 179095] Public Land Order No. 7814; Partial Revocation of Bureau of Reclamation Order Dated July 11, 1955, and Transfer of... Land Order. SUMMARY: This order revokes in-part a withdrawal created by a Bureau of Reclamation Order...

  7. Natural Hazards Observer. Volume XXV, Number 3

    DTIC Science & Technology

    2001-01-01

    National Science Foundation , Federal Emergency Management Agency, National Oceanic and Atmospheric Administration, U.S. (Geological Survey, U.S. Army Corps of Engineers, U.S. Environmental Protection Agency, U.S. Department of Transportation, U.S. Bureau of Reclamation, National Aeronautics and Space Administration, the Institute for Business and Home Safety, and the Public Entity Risk

  8. Natural Hazards Observer, Volume XXV No. 2, November 2000

    DTIC Science & Technology

    2000-11-01

    National Science Foundation , Federal Emergency Management Agency, National Oceanic and Atmospheric Administration, U.S. Geological Survey, U.S. Army Corps of Engineers, U.S. Environmental Protection Agency, U.S. Department of Transportation, U.S. Bureau of Reclamation, National Aeronautics and Space Administration, the Institute for Business and Home Safety, and the Public Entity Risk

  9. 75 FR 877 - Cancellation of the South Valley Facilities Expansion Project-Clark County, NV

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-06

    ... DEPARTMENT OF INTERIOR Bureau of Reclamation Cancellation of the South Valley Facilities Expansion Project-- Clark County, NV AGENCY: Bureau of Reclamation, Interior. ACTION: Cancellation of Notice of Intent to prepare the Environmental Impact Statement. SUMMARY: The Bureau of Reclamation, together with...

  10. 75 FR 15453 - Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Westlands Water District Drainage Repayment Contract AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of Proposed Repayment Contract. SUMMARY: The Bureau of Reclamation will be initiating negotiations with the...

  11. 76 FR 73674 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Status Report of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation, Interior. ACTION: Notice. SUMMARY... INFORMATION CONTACT: Michelle Kelly, Water and Environmental Resources Division, Bureau of Reclamation, P.O...

  12. 76 FR 60527 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Status Report of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation, Interior. ACTION: Notice. SUMMARY... CONTACT: Michelle Kelly, Water and Environmental Resources Division, Bureau of Reclamation, P.O. Box 25007...

  13. 75 FR 82066 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Status Report of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation, Interior. ACTION: Notice. SUMMARY... CONTACT: Michelle Kelly, Water and Environmental Services Division, Bureau of Reclamation, P.O. Box 25007...

  14. 76 FR 20707 - Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [INT-FES 11-02] Cle Elum Dam Fish Passage Facilities and Fish Reintroduction Project; Kittitas County, WA AGENCY: Bureau of Reclamation, Interior... Fish Passage Facilities and Fish Reintroduction Project. SUMMARY: The Bureau of Reclamation...

  15. 77 FR 11155 - Notice of Intent To Prepare an Environmental Impact Statement on the Pojoaque Basin Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-24

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Notice of Intent To Prepare an Environmental... Reclamation, Interior. ACTION: Notice of intent. SUMMARY: The Bureau of Reclamation (Reclamation) intends to... plan, design, and construct the Pojoaque Basin Regional Water System in accordance with the Settlement...

  16. Data dictionary and discussion for the midnite mine GIS database. Report of investigations/1996

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Peters, D.C.; Smith, M.A.; Ferderer, D.A.

    1996-01-18

    A geographic information system (GIS) database has been developed by the U.S. Bureau of Mines (USBM) for the Midnite Mine and surroundings in northeastern Washington State (Stevens County) on the Spokane Indian Reservation. The GIS database was compiled to serve as a repository and source of historical and research information on the mine site. The database also will be used by the Bureau of Land Management and the Bureau of Indian Affairs (as well as others) for environmental assessment and reclamation planning for future remediation and reclamation of the site. This report describes the data in the GIS database andmore » their characteristics. The report also discusses known backgrounds on the data sets and any special considerations encountered by the USBM in developing the database.« less

  17. Watershed models for decision support in the Yakima River basin, Washington

    USGS Publications Warehouse

    Mastin, M.C.; Vaccaro, J.J.

    2002-01-01

    A Decision Support System (DSS) is being developed by the U.S. Geological Survey and the Bureau of Reclamation as part of a long-term project, the Watershed and River Systems Management Program. The goal of the program is to apply the DSS to U.S. Bureau of Reclamation projects in the western United States. The DSS was applied to the Reclamation's Yakima Project in the Yakima River Basin in eastern Washington. An important component of the DSS is the physical hydrology modeling. For the application to the Yakima River Basin, the physical hydrology component consisted of constructing four watershed models using the U.S. Geological Survey's Precipitation-Runoff Modeling System within the Modular Modeling System. The implementation of these models is described. To facilitate calibration of the models, mean annual streamflow also was estimated for ungaged subbasins. The models were calibrated for water years 1950-94 and tested for water years 1995-98. The integration of the models in the DSS for real-time water-management operations using an interface termed the Object User Interface is also described. The models were incorporated in the DSS for use in long-term to short-term planning and have been used in a real-time operational mode since water year 1999.

  18. 75 FR 49518 - Northwest Area Water Supply Project, North Dakota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-13

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  19. 75 FR 48986 - Northwest Area Water Supply Project, North Dakota

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Northwest Area Water Supply Project, North Dakota... Area Water Supply Project (NAWS Project), a Federal reclamation project, located in North Dakota. A... CONTACT: Alicia Waters, Northwest Area Water Supply Project EIS, Bureau of Reclamation, Dakotas Area...

  20. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with...

  1. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with...

  2. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with...

  3. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with...

  4. 43 CFR 420.25 - Reclamation lands administered by other agencies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... for management of Reclamation lands for recreation purposes. Specifically: (1) Reclamation lands managed by the National Park Service, the Bureau of Sport Fisheries and Wildlife, the Bureau of Land Management, the Forest Service, and other Federal agencies will be administered in accordance with...

  5. Comparison of U.S. Geological Survey and Bureau of Reclamation water-use reporting in the Colorado River Basin

    USGS Publications Warehouse

    Bruce, Breton; Prairie, James; Maupin, Molly A.; Dodds, Jeremy; Eckhardt, David; Ivahnenko, Tamara I.; Matuska, Paul; Evenson, Eric; Harrison, Alan

    2018-06-26

    The use of water in the United States is arguably one of the most important factors determining water availability at any specific place and time. Numerous local, State, and Federal entities develop, compile, and report water-use data, which can lead to confusing or conflicting information. This report was authored jointly by the U.S. Geological Survey (USGS) and Bureau of Reclamation (Reclamation) to compare and contrast the two agencies’ water-use information programs in the Colorado River Basin. The report also describes the legal drivers for each program, clarifies confusing terminology, compares the methods used, and contrasts the information reported by each agency. This detailed comparison demonstrates that these two Federal agencies have different missions, different programmatic drivers, and different user communities, all of which lead to different approaches to water-use data collection, analysis, and reporting. This report highlights those differences and explains why the USGS and Reclamation programs exist and how the data serve different user communities. Even though the two water-use programs are different by design and purpose, the program comparison presented in this report has identified opportunities for closer coordination and sharing of information between the USGS and Reclamation, as well as program components where agency collaboration can improve water-use estimate methodologies. This comparison effort emphasizes that it is incumbent upon each agency to clearly define the meaning of the terms used and the appropriate application of the reported information to avoid confusion or the accidental misuse of the information. An additional benefit of this comparison effort is the formation of a joint USGS/Reclamation water-use team that will continue to investigate opportunities to expand and coordinate future water-use data compilation and reporting.

  6. 77 FR 33766 - Agency Information Collection Activities; Renewal of a Currently Approved Information Collection...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-07

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Agency Information Collection Activities; Renewal... Reclamation, Interior. ACTION: Notice of renewal and request for comments. SUMMARY: The Bureau of Reclamation... tribal organizations, to plan the design and construction of projects to serve rural areas with...

  7. NPDES Permit for Yellowtail Dam Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    Under NPDES permit MT-0022993, the U.S. Bureau of Reclamation is authorized to discharge from its wastewater treatment facility located at the Yellowtail Dam Field Office in Big Horn County, Montana, to the Yellowtail Afterbay Reservoir/Bighorn River.

  8. 77 FR 23506 - Notice of Inventory Completion: U.S. Department of Interior, Bureau of Reclamation, Upper...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-19

    ... Arizona State University, School of Human Evolution and Social Change, Tempe, AZ AGENCY: National Park... University, School of Human Evolution and Social Change, Tempe, AZ, and under the control of the U.S... University, School of Human Evolution and Social Change. No known individuals were identified. No associated...

  9. STUDY OF THE ARBUCKLE-SIMPSON AQUIFER

    EPA Science Inventory

    A study directed by the Oklahoma Water Resources Board and funded by the U.S. Bureau of Reclamation will investigate the hydrogeology of the Arbuckle-Simpson Aquifer in south-central Oklahoma. The five year study will involve field investigations including the installation of ne...

  10. National Centers for Environmental Prediction

    Science.gov Websites

    Statistics Observational Data Processing Data Assimilation Monsoon Desk Model Transition Seminars Seminar Department of Energy US Bureau of Reclamation Universities University Corporation for Atmospheric Research for Weather and Climate Prediction (NCWCP) 5830 University Research Court College Park, MD 20740 Page

  11. 78 FR 54910 - Notice of Intent To Prepare an Environmental Impact Statement and Public Scoping Meetings for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [A10-1523-2000-229-00-0-1, 3205000] Notice of... Apache Tribe Rural Water System Project, Arizona AGENCY: Bureau of Reclamation, Interior. ACTION: Notice... Act of 2010), the United States Congress authorized and directed Reclamation to plan, design, and...

  12. Bull trout (Salvelinus confluentus) telemetry and associated habitat data collected in a geodatabase from the upper Boise River, southwestern Idaho

    USGS Publications Warehouse

    MacCoy, Dorene E.; Shephard, Zachary M.; Benjamin, Joseph R.; Vidergar, Dmitri T.; Prisciandaro, Anthony F.

    2017-03-23

    Bull trout (Salvelinus confluentus), listed as threatened under the Endangered Species Act, are among the more thermally sensitive of coldwater species in North America. The Boise River upstream of Arrowrock Dam in southwestern Idaho (including Arrowrock Reservoir) provides habitat for one of the southernmost populations of bull trout. The presence of the species in Arrowrock Reservoir poses implications for dam and reservoir operations. From 2011 to 2014, the Bureau of Reclamation and the U.S. Geological Survey collected fish telemetry data to improve understanding of bull trout distribution and movement in Arrowrock Reservoir and in the upper Boise River tributaries. The U.S. Geological Survey compiled the telemetry (fish location) data, along with reservoir elevation, river discharge, precipitation, and water-quality data in a geodatabase. The geodatabase includes metadata compliant with Federal Geographic Data Committee content standards. The Bureau of Reclamation plans to incorporate the data in a decision‑support tool for reservoir management.

  13. NPDES Permit for Leadville Mine Drainage Tunnel Treatment Plant in Colorado

    EPA Pesticide Factsheets

    Under NPDES permit CO-0021717, the U.S. Bureau of Reclamation is authorized to discharge from the Leadville Mine Drainage Tunnel Treatment Plant in Lake County, Colorado to an unnamed drainage way tributary to the East Fork of the Arkansas River.

  14. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kilpatrick, Laura E.; Cotter, Ed

    The U.S. Department of Energy (DOE) Office of Legacy Management is responsible for administering the DOE Uranium Leasing Program (ULP) and its 31 uranium lease tracts located in the Uravan Mineral Belt of southwestern Colorado (see Figure 1). In addition to administering the ULP for the last six decades, DOE has also undertaken the significant task of reclaiming a large number of abandoned uranium (legacy) mine sites and associated features located throughout the Uravan Mineral Belt. In 1995, DOE initiated a 3-year reconnaissance program to locate and delineate (through extensive on-the-ground mapping) the legacy mine sites and associated features containedmore » within the historically defined boundaries of its uranium lease tracts. During that same time frame, DOE recognized the lack of regulations pertaining to the reclamation of legacy mine sites and contacted the U.S. Bureau of Land Management (BLM) concerning the reclamation of legacy mine sites. In November 1995, The BLM Colorado State Office formally issued the United States Department of the Interior, Colorado Bureau of Land Management, Closure/Reclamation Guidelines, Abandoned Uranium Mine Sites as a supplement to its Solid Minerals Reclamation Handbook (H-3042-1). Over the next five-and-one-half years, DOE reclaimed the 161 legacy mine sites that had been identified on DOE withdrawn lands. By the late 1990's, the various BLM field offices in southwestern Colorado began to recognize DOE's experience and expertise in reclaiming legacy mine sites. During the ensuing 8 years, BLM funded DOE (through a series of task orders) to perform reclamation activities at 182 BLM mine sites. To date, DOE has reclaimed 372 separate and distinct legacy mine sites. During this process, DOE has learned many lessons and is willing to share those lessons with others in the reclamation industry because there are still many legacy mine sites not yet reclaimed. DOE currently administers 31 lease tracts (11,017 ha) that collectively contain over 220 legacy (abandoned) uranium mine sites. This contrasts to the millions of hectares administered by the BLM, the U.S. Forest Service, and other federal, tribal, and state agencies that contain thousands of such sites. DOE believes that the processes it has used provide a practical and cost-effective approach to abandoned uranium mine-site reclamation. Although the Federal Acquisition Regulations preclude DOE from competing with private industry, DOE is available to assist other governmental and tribal agencies in their reclamation efforts. (authors)« less

  15. 8. Photographic copy of photograph. (Source: Department of Interior. Bureau ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    8. Photographic copy of photograph. (Source: Department of Interior. Bureau of Reclamation. Bitterroot Project History 1931-1962. National Archives, Denver, RG 115, Accession #115-90-039, Box 243) Photographer unknown. View of original rock-fill crib diversion structure, September 13, 1949. Diversion and head works for big ditch on Rock Creek. - Bitter Root Irrigation Project, Rock Creek Diversion Dam, One mile east of Como Dam, west of U.S. Highway 93, Darby, Ravalli County, MT

  16. Photographic copy of photograph, photographer unknown, August 1912 (original print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of photograph, photographer unknown, August 1912 (original print located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "A VIEW OF METHOD OF DAM CONSTRUCTION" - Kachess Dam, Kachess River, 1.5 miles north of Interstate 90, Easton, Kittitas County, WA

  17. 38. Photographic copy of photograph, photographer unknown, 26 March 1915 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photographic copy of photograph, photographer unknown, 26 March 1915 (original print located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). " Dredge after failure of control dam." - Keechelus Dam, Yakima River, 10 miles northwest of Easton, Easton, Kittitas County, WA

  18. 39. Photographic copy of photograph, photographer unknown, 26 March 1915 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Photographic copy of photograph, photographer unknown, 26 March 1915 (original print located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "View of control dam after failure." - Keechelus Dam, Yakima River, 10 miles northwest of Easton, Easton, Kittitas County, WA

  19. History of the Federal Interagency Sedimentation Project

    USGS Publications Warehouse

    Skinner, John V.

    1989-01-01

    Since 1939, the date of the Project's inception, the team has operated under the direction of two lead agencies - the U.S. Geological Survey and U.S. Army Corps of Engineers. The supporting agencies are the Agricultural Research Service, Bureau of Reclamation, U.S. Forest Service, Bureau of Land Management, Federal Highway Administration, and the Tennessee Valley Authority. Overall direction of the Project rests with the Subcommittee on Sedimentation, Interagency Advisory Committee on Water Data. The Project's goals focus on improving and maintaining the quality of fluvial sediment data by (1) developing sediment samplers, laboratory analyzers, and automatic gages (2) evaluating methods, (3) standardizing equipment and methods and (4) procuring, calibrating and selling equipment.

  20. Addressing Open Water Data Challenges in the Bureau of Reclamation

    NASA Astrophysics Data System (ADS)

    Brekke, L. D.; Danner, A.; Nagode, J.; Rocha, J.; Poulton, S.; Anderson, A.

    2017-12-01

    The Bureau of Reclamation is largest wholesaler of water in the United States. Located in the 17 western states, Reclamation serves water to 31 million people, provides irrigated water to 20 percent of Western farmers, and is the second largest producer of hydroelectric power in the United States. Through these activities, Reclamation generates large amounts of water and water-related data, describing reservoirs and river system conditions, hydropower, environmental compliance activities, infrastructure assets, and other aspects of Reclamation's mission activities. Reclamation aims to make water and water-related data sets more easily found, accessed, and used in decision-making activities in order to benefit the public, private sector, and research communities. Historically, there has not been an integrated, bureau-wide system to store data in machine-readable formats; nor a system to permit centralized browsing, open access, and web-services. Reclamation began addressing these limitations by developing the Reclamation Water Information System (RWIS), released in Spring 2017 (https://water.usbr.gov/). A bureau-wide team contributed to RWIS development, including water data stewards, database administrators, and information technology (IT) specialists. The first RWIS release publishes reservoir time series data from Reclamation's five regions and includes a map interface for sites identification, a query interface for data discovery and access, and web-services for automated retrieval. As RWIS enhancement continues, the development team is developing a companion system - the Reclamation Information Sharing Environment (RISE) - to provide access to the other data subjects and types (geospatial, documents). While RWIS and RISE are promising starts, Reclamation continues to face challenges in addressing open water data goals: making data consolidation and open publishing a value-added activity for programs that publish data locally, going beyond providing open access to also providing decision-support, and scaling up IT solutions for future success - where Reclamation programs increasingly elect to more and more data through RWIS/RISE, thereby creating a big data challenge. This presentation will highlight activities status, lessons learned, and future directions.

  1. Photographic copy of photograph, photographer unknown, August 1912 (original print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of photograph, photographer unknown, August 1912 (original print located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "METHOD OF CONSTRUCTING DAM AFTER REMOVING OF TRESTLE" - Kachess Dam, Kachess River, 1.5 miles north of Interstate 90, Easton, Kittitas County, WA

  2. 46. Photographic copy of photograph, photographer unknown, 24 July 1916 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    46. Photographic copy of photograph, photographer unknown, 24 July 1916 (original print located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "Scheme for shelter for cransemen on bucyrus steam shovel." - Keechelus Dam, Yakima River, 10 miles northwest of Easton, Easton, Kittitas County, WA

  3. 77 FR 30022 - U.S. Extractive Industries Transparency Initiative Stakeholder Assessment Public Listening...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-21

    ... of Ocean Energy Management, 3801 Centerpoint Drive, Suite 100, Anchorage, AK 99503-5820, tel. 907... Surface Mining Reclamation and Enforcement, Building 3, Parkway Center, Conference Room, 2nd Floor...:00 pm CDT, June 12, 2012, Bureau of Ocean Energy Management, 1201 Elmwood Park Boulevard, Room 135...

  4. WELLTON GOVERNMENT CAMP, PERMANENT GARAGE TYPE 1G. PLAN, ELEVATIONS, AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    WELLTON GOVERNMENT CAMP, PERMANENT GARAGE TYPE 1-G. PLAN, ELEVATIONS, AND SECTIONS. Drawing 50-308-4552, dated October 25, 1949. U.S. Department of the Interior, Bureau of Reclamation, Yuma, Arizona - Wellton-Mohawk Irrigation System, Permanent Garage Type 1-G, 30601 Wellton-Mohawk Drive, Wellton, Yuma County, AZ

  5. Northwest Passages: A History of the Seattle District, U.S. Army Corps of Engineers, Volume II 1920-1970

    DTIC Science & Technology

    2006-01-01

    Reclamation, that the Corps was poaching on the Bureau’s preserve, relations between the Corps and the Bureau at the regional level proceeded...considerable opposition from fisheries interests. They denounced all dams below Foster Creek because of their impact on fish runs. In addition, the Atomic...the border. The site, however, still had major impacts on the rai lroad, timber, and mining interests in the area around the town of Libby. The Corps

  6. 77 FR 33240 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-05

    ... Project water conservation best management practices that shall ``develop criteria for evaluating the... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  7. 76 FR 54251 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-31

    ... and administer an office on Central Valley Project water conservation best management practices that... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  8. 75 FR 70020 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior ACTION: Notice of Availability. SUMMARY: The...

  9. 77 FR 64544 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... Central Valley Project water conservation best management practices that shall ``develop criteria for... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  10. 76 FR 12756 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-08

    ... office on Central Valley Project water conservation best management practices that shall ``* * * develop... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  11. 75 FR 38538 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... to establish and administer an office on Central Valley Project water conservation best management... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The...

  12. Applications of Landsat data and the data base approach

    USGS Publications Warehouse

    Lauer, D.T.

    1986-01-01

    A generalized methodology for applying digital Landsat data to resource inventory and assessment tasks is currently being used by several bureaux and agencies within the US Department of the Interior. The methodology includes definition of project objectives and output, identification of source materials, construction of the digital data base, performance of computer-assisted analyses, and generation of output. The USGS, Bureau of Land Management, US Fish and Wildlife Service, Bureau of Indian Affairs, Bureau of Reclamation, and National Park Service have used this generalized methodology to assemble comprehensive digital data bases for resource management. Advanced information processing techniques have been applied to these data bases for making regional environmental surveys on millions of acres of public lands at costs ranging from $0.01 to $0.08 an acre.-Author

  13. 75 FR 69698 - Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-15

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Criteria for Developing Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The ``Criteria for Developing Refuge Water Management Plans'' (Refuge...

  14. Tapping Water from the Atmosphere: The Bureau of Reclamation's Project Skywater (Invited)

    NASA Astrophysics Data System (ADS)

    Harper, K.

    2010-12-01

    Since President Theodore Roosevelt signed the Reclamation Act on 17 June 1902—creating the forerunner of today’s Bureau of Reclamation that was established under Interior in 1907—this agency has been tasked with developing water resources in the US West. These efforts focused on building dams, reservoirs, and irrigation systems. But by the early 1960s, the federal government’s increasing interest in weather control began to attract the attention of BuRec’s leaders. Deciding that it was time to track down solid information on rainmaking techniques, the bureau called upon weather control pioneer Vincent Schaefer for assistance with its plan use weather modification as an adjunct to its water resources development portfolio. In response, Schaefer—writing to the National Science Foundation’s Earl Droessler in late 1961—declared that the Bureau’s proposed project would bring a “responsible, capable, and enthusiastic” group to represent the government and take over the engineering parts of weather modification. Enthusiastic was a bit of an understatement. BuRec was eager to use the atmosphere as a water reservoir, which could dispense moisture to watersheds feeding their earth-bound reservoirs. Contracting with universities—and working to get ahead of its nemesis, the skeptical US Weather Bureau—BuRec announced the artificial precipitation successes of its “Laboratory in the Sky” in early 1963. Although this headquarters-announced “success” was disputed by BuRec’s Denver field office, BuRec’s colorful commissioner Floyd Dominy was determined to press forward. Within months, the bureau was publishing reports indicating that the US West was a “potential future food deficit area” due to an increasing population that was outstripping the availability of ground and surface waters for agriculture. New approaches would be necessary to bring water to BuRec reservoirs for further distribution to municipalities, irrigators, and industries. The Atmospheric Water Resources Program could provide the answer by analyzing reclamation projects’ needs for additional water, the availability of related hydrologic and hydrometeorologic data, and the possibility of obtaining reasonably successful results by tapping into the knowledge and skills of its engineers, hydrometeorologists, and hydrologists. But as far as BuRec was concerned, this program—eventually dubbed Project Skywater—would do more than exploit the atmosphere as a water reservoir. It would provide the bureau with a vehicle to expand its portfolio to the entire nation. And as the eastern part of the nation experienced drought conditions in the mid-1960s, the opportunity was ripe for the picking. Therefore, the story of Skywater’s genesis provides an interesting case study in the intersection of water science, technology, and politics at the highest levels of federal government.

  15. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Reclamation law enforcement policy. 422.3..., DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3 Reclamation law enforcement policy. The law enforcement policy of Reclamation is: (a) To maintain an accountable...

  16. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Reclamation law enforcement policy. 422.3..., DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3 Reclamation law enforcement policy. The law enforcement policy of Reclamation is: (a) To maintain an accountable...

  17. 43 CFR 422.3 - Reclamation law enforcement policy.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Reclamation law enforcement policy. 422.3..., DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.3 Reclamation law enforcement policy. The law enforcement policy of Reclamation is: (a) To maintain an accountable...

  18. 76 FR 58840 - Central Valley Project Improvement Act; Refuge Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act; Refuge Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: To meet the requirements of the Central Valley Project Improvement Act of 1992 (CVPIA) and subsequent...

  19. 76 FR 44948 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-27

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Status Report of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation, Interior. ACTION: Notice. SUMMARY... SUPPLEMENTARY INFORMATION section. FOR FURTHER INFORMATION CONTACT: Michelle Kelly, Water and Environmental...

  20. 77 FR 57588 - Agency Information Collection; Proposed Revisions to a Currently Approved Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-18

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Agency Information Collection; Proposed Revisions to a Currently Approved Information Collection AGENCY: Bureau of Reclamation, Interior. ACTION... editorial nature, and are designed to assist the respondents by increasing their understanding of the forms...

  1. 77 FR 57587 - Agency Information Collection; Proposed Revisions to a Currently Approved Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-18

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Agency Information Collection; Proposed Revisions to a Currently Approved Information Collection AGENCY: Bureau of Reclamation, Interior. ACTION... forms and the corresponding instructions are of an editorial nature, and are designed to assist the...

  2. 43 CFR 429.33 - What are the consequences for using Reclamation land, facilities, and waterbodies without...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Reclamation land, facilities, and waterbodies without authorization? 429.33 Section 429.33 Public Lands... BUREAU OF RECLAMATION LAND, FACILITIES, AND WATERBODIES Prohibited and Unauthorized Uses of Reclamation Land, Facilities, and Waterbodies § 429.33 What are the consequences for using Reclamation land...

  3. 76 FR 26718 - Gibson Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-09

    ... Dam Hydroelectric Company, LLC; Notice of Availability of Draft Environmental Assessment In accordance... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's, Gibson dam on the Sun River in Lewis and Clark and Teton...

  4. 77 FR 2970 - Gibson Dam Hydroelectric Company, LLC, Montana; Notice of Availability of Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 12478-003] Gibson Dam... reviewed the application for license for the Gibson Dam Hydroelectric Project, located at the U.S. Department of the Interior, Bureau of Reclamation's Gibson dam on the Sun River in Lewis and Clark and Teton...

  5. Synopsis of integrated science to support the assessment of conservation practices in the Fort Cobb reservoir watershed, southwestern Oklahoma

    USDA-ARS?s Scientific Manuscript database

    The Fort Cobb Reservoir in southwestern Oklahoma is an artificial impoundment constructed by the Bureau of Reclamation for water supplies, flood control, and recreation. Success of best-management practices in reducing inflows of sediments and phosphorus to the reservoir prompted the U.S. Departmen...

  6. 76 FR 36153 - Notice of Inventory Completion: U.S. Department of the Interior, Bureau of Reclamation, Pacific...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-21

    .... Between 1950 and 1957, Roger Heglar, a University of Washington graduate student, analyzed the burials... Washington University, Ellensburg, WA. The human remains and associated funerary objects were removed from... objects. The National Park Service is not responsible for the determinations in this notice. Consultation...

  7. Photographic copy of photograph, Walter Lubken, photographer, 1908 (original print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of photograph, Walter Lubken, photographer, 1908 (original print located at U.S. Bureau of Reclamation Pacific Northwest Regional Office, Boise, Idaho). GOVERNMENT FORCES CONSTRUCTION CAMP AT THE BOISE RIVER DIVERSION DAMSITE BEFORE BEGINNING OF CONSTRUCTION ON DIVERSION STRUCTURE - Boise Project, Boise River Diversion Dam, Across Boise River, Boise, Ada County, ID

  8. WELLTON GOVERNMENT CAMP, PERMANENT GARAGE TYPE 2G. PLAN, ELEVATIONS, AND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    WELLTON GOVERNMENT CAMP, PERMANENT GARAGE TYPE 2-G. PLAN, ELEVATIONS, AND SECTIONS. Drawing 50-308-4553, dated October 21, 1949. U.S. Department of the Interior, Bureau of Reclamation, Yuma, Arizona - Wellton-Mohawk Irrigation System, Permanent Garage Type 2-G, 30611 and 30621 Wellton-Mohawk Drive, Wellton, Yuma County, AZ

  9. 75 FR 82066 - Change in Discount Rate for Water Resources Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Change in Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a...

  10. 78 FR 16706 - Change in Discount Rate for Water Resources Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-18

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Change in Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a...

  11. 76 FR 73674 - Change in Discount Rate for Water Resources Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-29

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Change in Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a...

  12. 75 FR 8106 - Change in Discount Rate for Water Resources Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-23

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Change in Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a...

  13. 78 FR 21969 - Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... of Water Service, Repayment, and Other Water- Related Contract Actions AGENCY: Bureau of Reclamation... Kelly, Water and Environmental Resources Division, Bureau of Reclamation, P.O. Box 25007, Denver... for the delivery of project water for authorized uses in newspapers of general circulation in the...

  14. 77 FR 46518 - Draft Resource Management Plan/General Plan Draft Environmental Impact Statement/Revised Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-03

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Draft Resource Management Plan/General Plan Draft... Recreation Area, Merced County, California AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of... California Department of Parks and Recreation was given the responsibility to plan, design, construct...

  15. 76 FR 55703 - Draft Environmental Impact Statement/Environmental Impact Report and Notice of Public Meetings...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-08

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Draft Environmental Impact Statement..., Sacramento County, CA AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability and public.... The preliminary design concepts being considered in the Draft EIS/EIR are one three-story building or...

  16. 75 FR 60804 - Nimbus Hatchery Fish Passage Project, Lower American River, California

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-01

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Nimbus Hatchery Fish Passage Project, Lower... Act (CEQA), the Bureau of Reclamation, the lead Federal agency, and the California Department of Fish... Draft EIS/EIR for the Nimbus Hatchery Fish Passage Project (Project). The purpose of the Project is to...

  17. 76 FR 18581 - Correction; Central Valley Project Improvement Act, Standard Criteria for Agricultural and Urban...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-04

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Correction; Central Valley Project Improvement Act, Standard Criteria for Agricultural and Urban Water Management Plans AGENCY: Bureau of Reclamation... notice in the Federal Register at 76 FR 16818 on the Central Valley Project Improvement Act Standard...

  18. 43 CFR 404.33 - How much Federal funding can Reclamation provide for the completion of a feasibility study?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.33 How much Federal funding can Reclamation provide for the completion...

  19. 43 CFR 404.30 - How much Federal funding can Reclamation provide for the completion of an appraisal investigation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.30 How much Federal funding can Reclamation provide for the completion...

  20. 43 CFR 404.32 - Can Reclamation reduce the non-Federal cost-share required for an appraisal investigation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.32 Can Reclamation reduce the non-Federal cost-share required for an...

  1. 43 CFR 404.43 - What process will Reclamation follow to determine if an appraisal investigation is ready for review?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Appraisal Investigations § 404.43 What process will Reclamation follow to determine if an...

  2. 43 CFR 404.48 - What process will Reclamation follow to determine if a feasibility study is ready for review?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.48 What process will Reclamation follow to determine if a...

  3. 43 CFR 404.34 - Can Reclamation reduce the amount of non-Federal cost-share required for a feasibility study?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Cost-Sharing § 404.34 Can Reclamation reduce the amount of non-Federal cost-share required...

  4. 78 FR 25763 - Agency Information Collection Activities Under OMB Review; Renewal of a Currently Approved...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [A10-1412-0001-009-01-0-4, 8453000; OMB Control... Approved Information Collection AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of renewal and... the Department of the Interior at the Office of Management and Budget, Office of Information and...

  5. 43 CFR 422.5 - Responsibilities of the Law Enforcement Administrator.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Responsibilities of the Law Enforcement Administrator. 422.5 Section 422.5 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS Responsibilities § 422.5 Responsibilities of...

  6. 78 FR 35314 - Availability of Final Environmental Impact Statement; Bunker Hill Groundwater Basin, Riverside...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-12

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [A10-1999-6000-100-00-0-0-3, 3501000] Availability of Final Environmental Impact Statement; Bunker Hill Groundwater Basin, Riverside-Corona Feeder... proposed Riverside-Corona Feeder Project. DATES: The Bureau of Reclamation will not make a decision on the...

  7. 75 FR 21341 - Millerton Lake Resource Management Plan/General Plan (RMP/GP), Madera and Fresno Counties, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Millerton Lake Resource Management Plan/General Plan (RMP/GP), Madera and Fresno Counties, CA AGENCY: Bureau of Reclamation, Interior. ACTION: Notice... adoption of the RMP/GP. The Final EIS/EIR outlines the formulation and evaluation of alternatives designed...

  8. 75 FR 71145 - San Joaquin River Restoration Program: Reach 4B, Eastside Bypass, and Mariposa Bypass Channel and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation San Joaquin River Restoration Program: Reach 4B...: Bureau of Reclamation, Interior. ACTION: Revised notice of intent to prepare an Environmental Impact...., the NRDC, Friant Water Users Authority, and the Departments of the Interior and Commerce (Settling...

  9. 43 CFR 423.2 - Definitions of terms used in this part.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Definitions of terms used in this part. 423.2 Section 423.2 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR PUBLIC CONDUCT ON BUREAU OF RECLAMATION FACILITIES, LANDS, AND WATERBODIES Purpose...

  10. 43 CFR 423.2 - Definitions of terms used in this part.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Definitions of terms used in this part. 423.2 Section 423.2 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR PUBLIC CONDUCT ON BUREAU OF RECLAMATION FACILITIES, LANDS, AND WATERBODIES Purpose...

  11. 43 CFR 423.2 - Definitions of terms used in this part.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Definitions of terms used in this part. 423.2 Section 423.2 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR PUBLIC CONDUCT ON BUREAU OF RECLAMATION FACILITIES, LANDS, AND WATERBODIES Purpose...

  12. 77 FR 45653 - Yakima River Basin Conservation Advisory Group; Yakima River Basin Water Enhancement Project...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-01

    ... 4 p.m. ADDRESSES: The meeting will be held at the Bureau of Reclamation, Yakima Field Office, 1917... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Yakima River Basin Conservation Advisory Group...: Notice of public meeting. SUMMARY: As required by the Federal Advisory Committee Act, the Yakima River...

  13. 75 FR 81641 - Odessa Subarea Special Study; Adams, Franklin, Grant, and Lincoln Counties, WA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-28

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [INT-DES 10-54] Odessa Subarea Special Study...). SUMMARY: The Bureau of Reclamation is extending the comment period for the Odessa Subarea Special Study... 83706-1234; telephone: (208) 378-5012. Libraries Ritzville Public Library, 302 West Main, Ritzville, WA...

  14. 75 FR 30852 - Hydroelectric Power Development at Ridgway Dam, Dallas Creek Project, Colorado

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-02

    ... Gold, Assistant Regional Director, Upper Colorado Region. [FR Doc. 2010-13149 Filed 6-1-10; 8:45 am..., Dallas Creek Project, Colorado AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of intent to..., Area Manager, Western Colorado Area Office, Bureau of Reclamation, 2764 Compass Drive, Suite 106, Grand...

  15. 78 FR 37846 - Resource Management Plan/General Plan and Environmental Impact Statement/Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-24

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [A20-0805-4999-400-00-0-0-2, 2100000] Resource... Reservoir State Recreation Area, Merced County, California AGENCY: Bureau of Reclamation, Interior. ACTION... Parks and Recreation was given the responsibility to plan, design, construct, maintain, and operate the...

  16. 75 FR 6218 - New Melones Lake Area Resource Management Plan, Tuolumne and Calaveras Counties, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-08

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation New Melones Lake Area Resource Management Plan...) has made available for public review a Final RMP/EIS for the New Melones Lake Area. The Final RMP/EIS... Dan Holsapple, Acting New Melones Resource Manager, Bureau of Reclamation, at 209-536- 9094...

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.

    This document is the annual report for fiscal year 2009 (FY09) for the project called Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers [Corps or USACE], U.S. Bureau of Reclamation) in response to obligations arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS).

  18. Photographic copy of photograph, photographer unknown, 18 February 1908 (original ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of photograph, photographer unknown, 18 February 1908 (original print located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "LAKE KACHESS CRIB DAM. TAKEN FROM UPSTREAM SIDE. 4 FEET OF SNOW" - Kachess Dam, 1904 Cascade Canal Company Crib Dam, Kachess River, 1.5 miles north of Interstate 90, Easton, Kittitas County, WA

  19. 12. Photographic copy of photograph, I.E. Houk, Jr., photographer, 26 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photographic copy of photograph, I.E. Houk, Jr., photographer, 26 September 1951 (original print located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "Keechelus Dam spillway. Placing concrete with scoopmobile and 'buggies', Hall Atwater Co." - Keechelus Dam, Spillway, Yakim River, 10 miles northwest of Easton, Easton, Kittitas County, WA

  20. 75 FR 70025 - Notice of Inventory Completion: U.S. Department of the Interior, Bureau of Reclamation, Pacific...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-16

    ... Repository, Nespelem, WA AGENCY: National Park Service, Interior. ACTION: Notice. Notice is hereby given in... Repository, Nespelem, WA. The human remains were removed from Grant County, WA. This notice is published as... Washington State University. In 2006, they were transferred to the Colville Tribal Repository for curation...

  1. 76 FR 57731 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ... Competing Applications; Kachess Dam Hydropower, LLC On May 31, 2011, Kachess Dam Hydropower, LLC filed an... study the feasibility of the Kachess Dam Hydroelectric Project (project) to be located at Kachess Reservoir dam, owned and operated by the U.S. Bureau of Reclamation near Cle Elum and Roslyn in Kittitas...

  2. Gila River Basin Native Fishes Conservation Program

    Treesearch

    Doug Duncan; Robert W. Clarkson

    2013-01-01

    The Gila River Basin Native Fishes Conservation Program was established to conserve native fishes and manage against nonnative fishes in response to several Endangered Species Act biological opinions between the Bureau of Reclamation and the U.S. Fish and Wildlife Service on Central Arizona Project (CAP) water transfers to the Gila River basin. Populations of some Gila...

  3. 78 FR 25764 - Agency Information Collection Activities Under OMB Review; Renewal of a Currently Approved...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [A10-1412-0001-009-01-0-4, 8453000; OMB Control... Approved Information Collection AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of renewal and... the Desk Officer for the Department of the Interior at the Office of Management and Budget, Office of...

  4. 43 CFR 422.6 - Responsibilities of the Chief Law Enforcement Officer.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Responsibilities of the Chief Law Enforcement Officer. 422.6 Section 422.6 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS Responsibilities § 422.6 Responsibilities of...

  5. 76 FR 1629 - Public Land Order No. 7758; Revocation of Secretarial Order Dated March 7, 1932; Wyoming

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-11

    ... the remaining 27,825 acres of National Forest System lands withdrawn for the Bureau of Reclamation's...,600 acres National Forest System lands in Sublette County, Wyoming, for the Bureau of Reclamation's.... The lands will not be opened to the public land or mining laws until completion of an analysis to...

  6. 78 FR 25766 - OMB Control Number 1006-0006; Agency Information Collection Activities Under OMB Review; Renewal...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-02

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation [A10-1412-0001-009-01-0-4, 8453000] OMB Control... Approved Information Collection AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of renewal and... June 3, 2013. ADDRESSES: Send written comments to the Desk Officer for the Department of the Interior...

  7. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false What is the Reclamation Rural Water Supply Program? 404.3 Section 404.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the Reclamation Rural Water Supply Program?...

  8. 43 CFR 404.3 - What is the Reclamation Rural Water Supply Program?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true What is the Reclamation Rural Water Supply Program? 404.3 Section 404.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.3 What is the Reclamation Rural Water Supply Program?...

  9. 43 CFR 404.45 - What will be included in the appraisal report prepared by Reclamation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What will be included in the appraisal report prepared by Reclamation? 404.45 Section 404.45 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM...

  10. 43 CFR 404.21 - What is Reclamation's role in preparing the full proposal?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What is Reclamation's role in preparing the full proposal? 404.21 Section 404.21 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404...

  11. 43 CFR 404.22 - How will Reclamation evaluate my full proposal?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation evaluate my full proposal? 404.22 Section 404.22 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.22 How will...

  12. 77 FR 73651 - North Star Hydro Services, CA LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ...), proposing to study the feasibility of the Marble Bluff Dam Hydropower Project to be located at the U.S. Bureau of Reclamation's Marble Bluff dam on the Truckee River, near Nixon, Washoe County, Nevada. The... east of the existing spillway of the Marble Bluff dam. Flow diverted at the sluice gate would be used...

  13. 43 CFR 429.3 - What types of uses are subject to the requirements and processes established under this part?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What types of uses are subject to the requirements and processes established under this part? 429.3 Section 429.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR USE OF BUREAU OF RECLAMATION...

  14. 43 CFR 429.3 - What types of uses are subject to the requirements and processes established under this part?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true What types of uses are subject to the requirements and processes established under this part? 429.3 Section 429.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR USE OF BUREAU OF RECLAMATION...

  15. 43 CFR 429.3 - What types of uses are subject to the requirements and processes established under this part?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false What types of uses are subject to the requirements and processes established under this part? 429.3 Section 429.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR USE OF BUREAU OF RECLAMATION...

  16. 43 CFR 429.3 - What types of uses are subject to the requirements and processes established under this part?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false What types of uses are subject to the requirements and processes established under this part? 429.3 Section 429.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR USE OF BUREAU OF RECLAMATION...

  17. 43 CFR 429.3 - What types of uses are subject to the requirements and processes established under this part?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false What types of uses are subject to the requirements and processes established under this part? 429.3 Section 429.3 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR USE OF BUREAU OF RECLAMATION...

  18. NASA Land Information System (LIS) Water Availability to Support Reclamation ET Estimation

    NASA Technical Reports Server (NTRS)

    Toll, David; Arsenault, Kristi; Pinheiro, Ana; Peters-Lidard, Christa; Houser, Paul; Kumar, Sujay; Engman, Ted; Nigro, Joe; Triggs, Jonathan

    2005-01-01

    The U.S. Bureau of Reclamation identified the remote sensing of evapotranspiration (ET) as an important water flux for study and designated a test site in the Lower Colorado River basin. A consortium of groups will work together with the goal to develop more accurate and cost effective techniques using the enhanced spatial and temporal coverage afforded by remote sensing. ET is a critical water loss flux where improved estimation should lead to better management of Reclamation responsibilities. There are several areas where NASA satellite and modeling data may be useful to meet Reclamation's objectives for improved ET estimation. In this paper we outline one possible contribution to use NASA's data integration capability of the Land Information System (LIS) to provide a merger of observational (in situ and satellite) with physical process models to provide estimates of ET and other water availability outputs (e.g., runoff, soil moisture) retrospectively, in near real-time, and also providing short-term predictions.

  19. 43 CFR 404.14 - How will Reclamation provide notice of opportunities for assistance under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation provide notice of opportunities for assistance under the program? 404.14 Section 404.14 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY...

  20. 43 CFR 404.37 - How will Reclamation determine the appropriate non-Federal share of construction costs?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will Reclamation determine the appropriate non-Federal share of construction costs? 404.37 Section 404.37 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY...

  1. 77 FR 11585 - Notice of Availability of the Aspinall Unit Operations Final Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-27

    ... Operations Final Environmental Impact Statement, Wayne N. Aspinall Unit, Colorado River Storage Project... SUMMARY: The Bureau of Reclamation (Reclamation), the Federal agency responsible for operation of the... Aspinall Unit operations, Gunnison and Montrose Counties, Colorado. DATES: Reclamation will not make a...

  2. Modeling Water Temperature in the Yakima River, Washington, from Roza Diversion Dam to Prosser Dam, 2005-06

    USGS Publications Warehouse

    Voss, Frank D.; Curran, Christopher A.; Mastin, Mark C.

    2008-01-01

    A mechanistic water-temperature model was constructed by the U.S. Geological Survey for use by the Bureau of Reclamation for studying the effect of potential water management decisions on water temperature in the Yakima River between Roza and Prosser, Washington. Flow and water temperature data for model input were obtained from the Bureau of Reclamation Hydromet database and from measurements collected by the U.S. Geological Survey during field trips in autumn 2005. Shading data for the model were collected by the U.S. Geological Survey in autumn 2006. The model was calibrated with data collected from April 1 through October 31, 2005, and tested with data collected from April 1 through October 31, 2006. Sensitivity analysis results showed that for the parameters tested, daily maximum water temperature was most sensitive to changes in air temperature and solar radiation. Root mean squared error for the five sites used for model calibration ranged from 1.3 to 1.9 degrees Celsius (?C) and mean error ranged from ?1.3 to 1.6?C. The root mean squared error for the five sites used for testing simulation ranged from 1.6 to 2.2?C and mean error ranged from 0.1 to 1.3?C. The accuracy of the stream temperatures estimated by the model is limited by four errors (model error, data error, parameter error, and user error).

  3. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Can Reclamation provide assistance with the construction of a rural water supply project under this program? 404.12 Section 404.12 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview §...

  4. 43 CFR 404.12 - Can Reclamation provide assistance with the construction of a rural water supply project under...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Can Reclamation provide assistance with the construction of a rural water supply project under this program? 404.12 Section 404.12 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview §...

  5. 43 CFR 404.49 - What criteria will Reclamation use to determine whether to recommend that a proposed rural water...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply project be authorized for construction? 404.49 Section 404.49 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURA...

  6. Climate Change and Water Resources Management: A Federal Perspective

    USGS Publications Warehouse

    Brekke, Levi D.; Kiang, Julie E.; Olsen, J. Rolf; Pulwarty, Roger S.; Raff, David A.; Turnipseed, D. Phil; Webb, Robert S.; White, Kathleen D.

    2009-01-01

    Many challenges, including climate change, face the Nation's water managers. The Intergovernmental Panel on Climate Change (IPCC) has provided estimates of how climate may change, but more understanding of the processes driving the changes, the sequences of the changes, and the manifestation of these global changes at different scales could be beneficial. Since the changes will likely affect fundamental drivers of the hydrological cycle, climate change may have a large impact on water resources and water resources managers. The purpose of this interagency report prepared by the U.S. Geological Survey (USGS), U.S. Army Corps of Engineers (USACE), Bureau of Reclamation (Reclamation), and National Oceanic and Atmospheric Administration (NOAA) is to explore strategies to improve water management by tracking, anticipating, and responding to climate change. This report describes the existing and still needed underpinning science crucial to addressing the many impacts of climate change on water resources management.

  7. 11. Photographic copy of photograph, photographer unknown, 2 July 1938 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photographic copy of photograph, photographer unknown, 2 July 1938 (original print located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "Inspecting concrete on upstream face of Keechelus Dam spillway. Joseph Jacobs, consulting engineer; M.B. Lemon, Gatetender; Paul Taylor, assistant engineer; and C.H. Paul, consulting engineer." - Keechelus Dam, Spillway, Yakim River, 10 miles northwest of Easton, Easton, Kittitas County, WA

  8. 77 FR 52758 - Agency Information Collection Activities under OMB Review; Renewal of a Currently Approved...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-30

    ... OMB Review; Renewal of a Currently Approved Collection; Reclamation Rural Water Supply Program AGENCY... and Budget (OMB) for review and approval: Reclamation Rural Water Supply Program, OMB Control Number... Supply Program (Rural Water Program) to submit information to allow the Bureau of Reclamation to evaluate...

  9. 43 CFR 404.50 - What information will be included in the feasibility report prepared by Reclamation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY... finding as to whether the proposed rural water supply project is feasible and the reasons supporting that determination; (b) A recommendation to Congress regarding whether or not the proposed rural water supply project...

  10. 77 FR 46121 - Notice of Proposed Information Collection; General Provisions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-02

    ... jurisdiction of surface coal mining and reclamation operations, petitions for rulemaking, and citizen suits filed under the Surface Mining Control and Reclamation Act of 1977. Bureau Form Number: None. Frequency...

  11. 75 FR 17955 - Public Land Order No. 7736; Partial Revocation of the Bureau of Reclamation Order Dated February...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-08

    ...: Bureau of Land Management. ACTION: Correction. SUMMARY: The Bureau of Land Management published a... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLCA930000; CACA 7817] Public Land Order No... Dated February 19, 1952, and Concurred in by the Bureau of Land Management on February 26, 1952...

  12. Evaporation from Lake Mead, Arizona and Nevada, 1997-99

    USGS Publications Warehouse

    Westenburg, Craig L.; DeMeo, Guy A.; Tanko, Daron J.

    2006-01-01

    Lake Mead is one of a series of large Colorado River reservoirs operated and maintained by the Bureau of Reclamation. The Colorado River system of reservoirs and diversions is an important source of water for millions of people in seven Western States and Mexico. The U.S. Geological Survey, in cooperation with the Bureau of Reclamation, conducted a study from 1997 to 1999 to estimate evaporation from Lake Mead. For this study, micrometeorological and hydrologic data were collected continually from instrumented platforms deployed at four locations on the lake, open-water areas of Boulder Basin, Virgin Basin, and Overton Arm and a protected cove in Boulder Basin. Data collected at the platforms were used to estimate Lake Mead evaporation by solving an energy-budget equation. The average annual evaporation rate at open-water stations from January 1998 to December 1999 was 7.5 feet. Because the spatial variation of monthly and annual evaporation rates was minimal for the open-water stations, a single open-water station in Boulder Basin would provide data that are adequate to estimate evaporation from Lake Mead.

  13. 43 CFR 404.28 - Is it possible to expedite the completion of an appraisal investigation or feasibility study?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... served by a proposed rural water supply project has urgent and compelling water needs, Reclamation will... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.28 Is it possible to expedite the completion of an appraisal investigation...

  14. Initiation and Frequency of Debris Flows in Grand Canyon, Arizona

    DTIC Science & Technology

    1996-01-01

    illustrations. Ed Holroyd, U.S. Bureau of Reclamation in Denver, Colorado, gave extensive technical help and advice with the GIS software. Steve Sutley, of the...value. Drainage-basin boundaries were drawn by hand on topographic maps, digitized, and entered into a GIS , which calculated drainage areas and centroids...overlying cliffs of more indurated sandstones and limestones. These processes result in rockfalls and rock avalanches that occur in all seasons, and under a

  15. The watershed and river systems management program

    USGS Publications Warehouse

    Markstrom, S.L.; Frevert, D.; Leavesley, G.H.; ,

    2005-01-01

    The Watershed and River System Management Program (WaRSMP), a joint effort between the U.S. Geological Survey (USGS) and the U.S. Bureau of Reclamation (Reclamation), is focused on research and development of decision support systems and their application to achieve an equitable balance among diverse water resource management demands. Considerations include: (1) legal and political constraints; (2) stake holder and consensus-building; (3) sound technical knowledge; (4) flood control, consumptive use, and hydropower; (5) water transfers; (6) irrigation return flows and water quality; (7) recreation; (8) habitat for endangered species; (9) water supply and proration; (10) near-surface groundwater; and (11) water ownership, accounting, and rights. To address the interdisciplinary and multi-stake holder needs of real-time watershed management, WaRSMP has developed a decision support system toolbox. The USGS Object User Interface facilitates the coupling of Reclamation's RiverWare reservoir operations model with the USGS Modular Modeling and Precipitation Runoff Modeling Systems through a central database. This integration is accomplished through the use of Model and Data Management Interfaces. WaRSMP applications include Colorado River Main stem and Gunnison Basin, the Yakima Basin, the Middle Rio Grande Basin, the Truckee-Carson Basin, and the Umatilla Basin.

  16. An exploration of Bureau of Reclamation approaches for managing conflict over diverging science

    USGS Publications Warehouse

    Burkardt, Nina; Ruell, Emily; Clark, Douglas

    2008-01-01

    As a major institutional agent supplying Western water resources, the Bureau of Reclamation (Reclamation) provides important leadership, technical, and financial resources in water management, serving as the West's "water broker" (Bowersox 2000; Pisani 2003). In recent years, growing numbers of constituencies using water and the over-allocation of water resources have contributed to conflict over the resource in the American West (National Research Council 2004). Although the conflicts arise from many sources, one common theme is that Reclamation managers often must make decisions about water use and allocation when scientific studies provide uncertain or competing recommendations. We conducted a preliminary study of Reclamation water managers and water scientists to try to understand the approaches or techniques they use or consider useful for dealing with scientific conflicts over water allocation and how these compare to techniques found in the relevant literature. We report the results of (1) an electronic survey of Reclamation senior managers and (2) a panel discussion amongst Reclamation senior managers as to the current institutional capabilities for managing diverging scientific findings in water dispute resolution processes. We conclude with a discussion of the strengths and weaknesses of the different tools and techniques managers reported in the survey and in the panel discussion.

  17. 77 FR 65403 - Public Land Order No. 7804; Partial Revocation of a Secretarial Order Dated December 4, 1909; ID

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-26

    ... Secretarial Order insofar as it affects 78.69 acres of National Forest System land withdrawn on behalf of the Bureau of Reclamation for the Payette Boise Reclamation Project within the Boise National Forest. This... Payette Boise Reclamation Project within the Boise National Forest is no longer used for the purpose for...

  18. 43 CFR 404.7 - What types of projects are eligible for consideration under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.7... consideration under the program, a rural water supply project must: (a) Meet the definition of a rural water supply project in § 404.2; and (b) Be located in a Reclamation State, as defined in § 404.2. ...

  19. Groundwater levels, trends, and relations to pumping in the Bureau of Reclamation Klamath Project, Oregon and California

    USGS Publications Warehouse

    Gannett, Marshall W.; Breen, Katherine H.

    2015-07-28

    The use of groundwater to supplement surface-water supplies for the Bureau of Reclamation Klamath Project in the upper Klamath Basin of Oregon and California markedly increased between 2000 and 2014. Pre-2001 groundwater pumping in the area where most of this increase occurred is estimated to have been about 28,600 acre-feet per year. Subsequent supplemental pumping rates have been as high as 128,740 acre-feet per year. During this period of increased pumping, groundwater levels in and around the Bureau of Reclamation Klamath Project have declined by about 20-25 feet. Water-level declines are largely due to the increased supplemental pumping, but other factors include increased pumping adjacent to the Klamath Project and drying climate conditions. This report summarizes the distribution and magnitude of supplemental groundwater pumping and groundwater-level declines, and characterizes the relation between the stress and response in subareas of the Klamath Project to aid decision makers in developing groundwater-management strategies.

  20. 43 CFR 404.7 - What types of projects are eligible for consideration under the program?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... consideration under the program, a rural water supply project must: (a) Meet the definition of a rural water... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.7...

  1. Analysis of historic agricultural irrigation data from the Natural Resources Conservation Service monitoring and evaluation for Grand Valley, Lower Gunnison Basin, and McElmo Creek Basin, western Colorado, 1985 to 2003

    USGS Publications Warehouse

    Mayo, John W.

    2015-01-01

    In 2011, the U.S. Geological Survey, in cooperation with the Bureau of Reclamation and the Colorado River Basin Salinity Control Forum, began a study to evaluate the Natural Resources Conservation Service evaluation data to (1) document the methods of the evaluation, and (2) analyze and summarize the data collected during the evaluation.

  2. Relation between selected water-quality variables and lake level in Upper Klamath and Agency Lakes, Oregon

    USGS Publications Warehouse

    Wood, Tamara M.; Fuhrer, Gregory J.; Morace, Jennifer L.

    1996-01-01

    Based on the analysis of data that they have been collecting for several years, the Klamath Tribes recently recommended that the Bureau of Reclamation (Reclamation) modify the operating plan for the dam to make the minimum lake levels for the June-August period more closely resemble pre-dam conditions (Jacob Kann, written commun., 1995). The U.S. Geological Survey (USGS) was asked to analyze the available data for the lake and to assess whether the evidence exists to conclude that year-to-year differences in certain lake water-quality variables are related to year-to-year differences in lake level. The results of the analysis will be used as scientific input in the process of developing an operating plan for the Link River Dam.

  3. Review of waterpower withdrawals in Weiser River Basin, Idaho

    USGS Publications Warehouse

    Colbert, Jesse Lane; Young, Loyd L.

    1964-01-01

    The Weiser River basin is primarily agricultural and is supported by extensive irrigation. The Geological Survey has initiated withdrawals, or has made powersite classifications of lands having value for reservoir sites and for waterpower production. These withdrawals have been examined to see if they should continue in force or if it is in the public interest to restore them. The 1960 report, "Upper Snake River Basin," by the U.S. bureau of Reclamation, and U.S. Army Corps of Engineers included recommendations conooming potential water resource-development sites in Water River basin. That report furnished much of the information for this review.

  4. 43 CFR 404.29 - Can the level of effort needed to complete an appraisal investigation or feasibility study be...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview... the total size, cost, and complexity of the proposed rural water supply project in order to reduce the...

  5. 43 CFR 420.5 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... any motorized vehicle (including the standard automobile) designed for or capable of cross-country... lawn tractors, and golf carts while being used for their designed purpose; (4) agricultural, timbering... the Bureau of Reclamation. (c) Reclamation lands mean all lands under the custody and control of the...

  6. 43 CFR 420.5 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... any motorized vehicle (including the standard automobile) designed for or capable of cross-country... lawn tractors, and golf carts while being used for their designed purpose; (4) agricultural, timbering... the Bureau of Reclamation. (c) Reclamation lands mean all lands under the custody and control of the...

  7. 43 CFR 420.5 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... any motorized vehicle (including the standard automobile) designed for or capable of cross-country... lawn tractors, and golf carts while being used for their designed purpose; (4) agricultural, timbering... the Bureau of Reclamation. (c) Reclamation lands mean all lands under the custody and control of the...

  8. 43 CFR 423.24 - Trespassing.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Trespassing. 423.24 Section 423.24 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR... Trespassing. You must not trespass on Reclamation facilities, lands, and waterbodies. Trespass includes any of...

  9. 43 CFR 423.24 - Trespassing.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Trespassing. 423.24 Section 423.24 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR... Trespassing. You must not trespass on Reclamation facilities, lands, and waterbodies. Trespass includes any of...

  10. 43 CFR 423.24 - Trespassing.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Trespassing. 423.24 Section 423.24 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR... Trespassing. You must not trespass on Reclamation facilities, lands, and waterbodies. Trespass includes any of...

  11. 43 CFR 423.24 - Trespassing.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Trespassing. 423.24 Section 423.24 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR... Trespassing. You must not trespass on Reclamation facilities, lands, and waterbodies. Trespass includes any of...

  12. 43 CFR 423.24 - Trespassing.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Trespassing. 423.24 Section 423.24 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR... Trespassing. You must not trespass on Reclamation facilities, lands, and waterbodies. Trespass includes any of...

  13. 76 FR 49787 - Rural Water Supply Program Approved Appraisal Reports; Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-11

    ...., prohibit rural residential growth) and water conservation (e.g., leak detection surveys). Dated: July 11... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Rural Water Supply Program Approved Appraisal...: Reclamation provides assistance for appraisal investigations and feasibility studies for rural water supply...

  14. 43 CFR 404.19 - What requirements must be met before I can request assistance to conduct a feasibility study?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.19 What requirements must be met before I can request assistance to conduct...

  15. Development and Application of Climate Services for Water Resources Planning and Management within the Department of Interior Bureau of Reclamation

    NASA Astrophysics Data System (ADS)

    Raff, D. A.; Morgan, A.; Brekke, L. D.

    2014-12-01

    The Bureau of Reclamation is the nation's largest wholesale water supplier and the second largest producer of hydropower. Reclamation operates 337 reservoirs with a total storage capacity of 245 million acre-feet and operates 53 hydroelectric powerplants that annually produce, on average for the past 10 years, 40 billion kilowatt-hours. Reclamation is adapting to the impacts and future challenges posed by the changing climate through the development of new climate services as well as through cooperation with Federal, state, local, tribal, academic, and non-governmental partners in the use of climate and water resource information that may be available. Reclamation is utilizing this information within a strategy that has four goals: 1) Increase Water Management Flexibility, 2) Enhance Climate Adaptation Planning, 3) Improve Infrastructure Resiliency, and 4) Expand Information Sharing. Within this presentation we will focus on the utilization of climate services within each of these key goals of Reclamation's strategy. This includes the utilization of climate information to track and potentially improve reservoir management to increase water management flexibility, the development of climate informed hydrology that supports climate adaptation planning, use of climate information to inform decisions of infrastructure resilience, and climate services use for jointly informed water management decisions through education and web based services.

  16. Environmental Management and the New Politics of Western Water: The Animas-La Plata Project and Implementation of the Endangered Species Act.

    PubMed

    ELLISON

    1999-05-01

    / This paper explores the new politics of western water policy through an examination of the Animas-La Plata water project and implementation of the Endangered Species Act. It is suggested that the focus of western water programming has shifted from the source of distributed funds, the United States Congress, to the agencies originally created to deliver federal benefits because funding for new project construction has not been forthcoming. Under this new system, members of Congress continue to excite their constituents with promises of money for new project starts, while the administrative agencies perform the myriad duties needed to keep these projects alive. The result is that political objectives have replaced operational/management objectives in administrative processes. In this case, the author demonstrates how resource managers in the Bureau of Reclamation manipulated hydrological analysis to control administrative process, why their manipulation was unfair, and perhaps illegal, and why biologists from the US Fish and Wildlife Service accepted the analysis. While ostensibly protecting all interests, the result is that none of the objectives of federal water programming are achieved. KEY WORDS: Environmental management; Administrative politics; Water policy; Endangered Species Act; Animas-La Plata, Bureau of Reclamation

  17. Status of the 4 MW WTS-4 wind turbine

    NASA Technical Reports Server (NTRS)

    Bussolari, R. J.

    1982-01-01

    The WTS-4 is a four-megawatt, horizontal-axis wind turbine presently being fabricated for the U.S. Department of Interior, Bureau of Reclamation, by United Technologies' Hamilton Standard division. This unit, called the System Verification Unit (SVU) will be installed at Medicine Bow, Wyoming, early next spring. The specifications, characteristics and features of the WTS-4 are discussed. The major components-such as rotor, nacelle and tower-are described and their status in the fabrication phase is presented.

  18. Installation Restoration Program. Phase 2. Confirmation/Quantification. Stage 1 for Mather AFB, Sacramento, California. Volume 1.

    DTIC Science & Technology

    1986-06-15

    to their respective areas in the basin to 30 metres at Feather River near Marysville and 15 metres on tributaries to the Feather and Sacra- mento ...Overlain by Arroyo Seco gravels mento Valley. south of the American River. Thickness approxi- mately 100 metres and possibly up to 300 metres along...Communications with personnel from the U.S. Bureau of Reclamation Office in Sacra- mento , however, indicate that there are no major breaches in the

  19. 43 CFR 404.20 - What information must I include in my full proposal to conduct an appraisal or a feasibility study?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.20 What information must I include in my full proposal to conduct an...

  20. 43 CFR 418.30 - Provisions required in future contracts.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... by the Secretary of rights and options to enforce this part. Water Management and Conservation ... RECLAMATION, DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.30 Provisions required in future contracts. The Bureau must provide in new...

  1. 43 CFR 418.30 - Provisions required in future contracts.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... by the Secretary of rights and options to enforce this part. Water Management and Conservation ... RECLAMATION, DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.30 Provisions required in future contracts. The Bureau must provide in new...

  2. 43 CFR 418.30 - Provisions required in future contracts.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... by the Secretary of rights and options to enforce this part. Water Management and Conservation ... RECLAMATION, DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.30 Provisions required in future contracts. The Bureau must provide in new...

  3. 43 CFR 418.30 - Provisions required in future contracts.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... by the Secretary of rights and options to enforce this part. Water Management and Conservation ... RECLAMATION, DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.30 Provisions required in future contracts. The Bureau must provide in new...

  4. 43 CFR 418.30 - Provisions required in future contracts.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... by the Secretary of rights and options to enforce this part. Water Management and Conservation ... RECLAMATION, DEPARTMENT OF THE INTERIOR OPERATING CRITERIA AND PROCEDURES FOR THE NEWLANDS RECLAMATION PROJECT, NEVADA Enforcement § 418.30 Provisions required in future contracts. The Bureau must provide in new...

  5. 43 CFR 402.6 - Price.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Price. 402.6 Section 402.6 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR SALE OF LANDS IN FEDERAL RECLAMATION PROJECTS Public Lands § 402.6 Price. The price of land sold under this...

  6. 43 CFR 404.16 - What information must I include in my statement of interest?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404... water supply project, including: (1) Geographical scope; (2) Demographics; and (3) Existing rural water... description of project alternatives that may be considered in the investigation, including: (1) Water supply...

  7. 43 CFR 404.16 - What information must I include in my statement of interest?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...; (2) Water demand management alternatives (e.g., water conservation and other approaches to reduce... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404... water supply project, including: (1) Geographical scope; (2) Demographics; and (3) Existing rural water...

  8. 43 CFR 404.16 - What information must I include in my statement of interest?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...; (2) Water demand management alternatives (e.g., water conservation and other approaches to reduce... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404... water supply project, including: (1) Geographical scope; (2) Demographics; and (3) Existing rural water...

  9. 43 CFR 404.16 - What information must I include in my statement of interest?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...; (2) Water demand management alternatives (e.g., water conservation and other approaches to reduce... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404... water supply project, including: (1) Geographical scope; (2) Demographics; and (3) Existing rural water...

  10. WFRC patrners: our extended family

    USGS Publications Warehouse

    Connolly, P.; Elliot, D.; Parsley, M.; Winton, J.

    2007-01-01

    For more than five decades the Western Fisheries Research Center (WFRC) has worked with partners to provide research findings to managers of aquatic resources. Those partners form an extended family, a network of clients, colleagues, co-investigators, and customers. Our partners include numerous clients in other Department of Interior bureaus such as the U.S. Fish and Wildlife Service, the U.S. Bureau of Reclamation, and the National Park Service. But there is much more--we have partners in other federal agencies, state agencies, and universities. The extended family includes tribal governments, and non-government organizations such as the Nature Conservancy and the Lower Columbia River Estuary Program.

  11. Map showing principal drainage basins, principal runoff-producing areas, and selected stream flow data in the Kaiparowits coal-basin area, Utah

    USGS Publications Warehouse

    Price, Don

    1978-01-01

    This is one of a series of maps that describe the geology and related natural resources in the Kaiparowits coal-basin area. Streamflow records used to compile this map and the accompanying table were collected by the U.S. Geological Survey in cooperation with the Utah State Engineer and the Utah Department of Transportation. The principal runoff-producing areas were delineated from a work map (scale 1:250,000) compiled to estimate water yields in Utah (Bagley and others, 1964). Information about Lake Powell was furnished by the U.S. Bureau of Reclamation.

  12. 43 CFR 2524.8 - Cancellation of entries for nonpayment of water-right charges.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.8 Cancellation of entries for nonpayment of water-right charges. All homestead and desert-land entrymen holding land under the reclamation law...

  13. 43 CFR 2524.8 - Cancellation of entries for nonpayment of water-right charges.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.8 Cancellation of entries for nonpayment of water-right charges. All homestead and desert-land entrymen holding land under the reclamation law...

  14. 43 CFR 2524.8 - Cancellation of entries for nonpayment of water-right charges.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.8 Cancellation of entries for nonpayment of water-right charges. All homestead and desert-land entrymen holding land under the reclamation law...

  15. 43 CFR 404.46 - Who will the appraisal report be provided to?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Who will the appraisal report be provided to? 404.46 Section 404.46 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Appraisal Investigations § 404...

  16. 43 CFR 404.41 - How will an appraisal investigation be conducted under this program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will an appraisal investigation be conducted under this program? 404.41 Section 404.41 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Appraisal...

  17. 43 CFR 404.42 - How much time is provided to complete an appraisal investigation?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How much time is provided to complete an appraisal investigation? 404.42 Section 404.42 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Appraisal...

  18. 43 CFR 404.5 - Who is responsible for implementing this rule?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Who is responsible for implementing this rule? 404.5 Section 404.5 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.5 Who is...

  19. 43 CFR 404.47 - How will a feasibility study be conducted under this program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How will a feasibility study be conducted under this program? 404.47 Section 404.47 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility...

  20. 43 CFR 404.52 - Who will the feasibility report be provided to?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Who will the feasibility report be provided to? 404.52 Section 404.52 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.52...

  1. 43 CFR 404.55 - Who is responsible for the operation, maintenance, and replacement costs?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Who is responsible for the operation, maintenance, and replacement costs? 404.55 Section 404.55 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM...

  2. Selenium contamination and remediation at Stewart Lake Waterfowl Management Area and Ashley Creek, middle Green River basin, Utah

    USGS Publications Warehouse

    Rowland, Ryan C.; Stephens, Doyle W.; Waddell, Bruce; Naftz, David L.

    2003-01-01

    Selenium is an element required in trace amounts for human and animal health, but it can cause health problems for livestock, wildlife, and humans when ingested in higher-than-required concentrations. Incidences of mortality, birth defects, and reproductive failure in waterfowl were discovered at Kesterson National Wildlife Refuge, San Joaquin Valley, California, by the U.S. Fish and Wildlife Service (USFWS) in 1983 (Presser, 1994). These problems were attributed to elevated concentrations of selenium in irrigation drainage that discharged to the refuge. Because of concern about possible adverse effects from irrigation drainage on Department of the Interior (DOI) projects elsewhere in the United States, the DOI organized scientists from the U.S. Geological Survey (USGS), USFWS, Bureau of Reclamation (BOR), and Bureau of Indian Affairs (BIA) to form the National Irrigation Water-Quality Program (NIWQP). The objectives of the program are to investigate DOI-managed lands for potential contamination related to irrigation drainage, conduct studies to identify the problems, investigate methodologies to remediate those problems, and implement remediation plans (U.S. Department of the Interior, 2002).

  3. Climate Change Planning for Military Installations: Findings and Implications

    DTIC Science & Technology

    2010-10-01

    Meridional Overturning Circulation ARFORGEN Army Force Generation BASH Bird Aircraft Strike Hazard BLM Bureau of Land Management BOR Bureau of Reclamation...Cover and Land Use Change LLNL Lawrence Livermore National Laboratory MOC Meridional Overturning Circulation NASA National Aeronautics and Space...to discern effects of climate change. D.7.9 Bureau of Land Management BLM is responsible for managing much of the federal land affected by

  4. 25 CFR 225.5 - Authority and responsibility of the Office of Surface Mining Reclamation and Enforcement (OSMRE).

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Authority and responsibility of the Office of Surface Mining Reclamation and Enforcement (OSMRE). 225.5 Section 225.5 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ENERGY AND MINERALS OIL AND GAS, GEOTHERMAL, AND SOLID MINERALS AGREEMENTS General...

  5. 25 CFR 225.5 - Authority and responsibility of the Office of Surface Mining Reclamation and Enforcement (OSMRE).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Authority and responsibility of the Office of Surface Mining Reclamation and Enforcement (OSMRE). 225.5 Section 225.5 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ENERGY AND MINERALS OIL AND GAS, GEOTHERMAL, AND SOLID MINERALS AGREEMENTS General...

  6. Deposition of selenium and other constituents in reservoir bottom sediment of the Solomon River Basin, north-central Kansas

    USGS Publications Warehouse

    Christensen, Victoria G.

    1999-01-01

    The Solomon River drains approximately 6,840 square miles of mainly agricultural land in north-central Kansas. The Bureau of Reclamation, U.S. Department of the Interior, has begun a Resource Management Assessment (RMA) of the Solomon River Basin to provide the necessary data for National Environmental Policy Act (NEPA) compliance before renewal of long-term water-service contracts with irrigation districts in the basin. In May 1998, the U.S. Geological Survey (USGS) collected bottom-sediment cores from Kirwin and Webster Reservoirs, which are not affected by Bureau irrigation, and Waconda Lake, which receives water from both Bureau and non-Bureau irrigated lands. The cores were analyzed for selected physical properties, total recoverable metals, nutrients, cesium-137, and total organic carbon. Spearman's rho correlations and Kendall's tau trend tests were done for sediment concentrations in cores from each reservoir. Selenium, arsenic, and strontium were the only constituents that showed an increasing trend in concentrations for core samples from more than one reservoir. Concentrations and trends for these three constituents were compared to information on historical irrigation to determine any causal effect. Increases in selenium, arsenic, and strontium concentrations can not be completely explained by Bureau irrigation. However, mean selenium, arsenic, and strontium concentrations in sediment from all three reservoirs may be related to total irrigated acres (Bureau and non-Bureau irrigation) in the basin. Selenium, arsenic, and strontium loads were calculated for Webster Reservoir to determine if annual loads deposited in the reservoir were increasing along with constituent concentrations. Background selenium, arsenic, and strontium loads in Webster Reservoir are significantly larger than post-background loads.

  7. 30 CFR 886.27 - What special procedures apply to Indian lands not subject to an approved Tribal reclamation program?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR ABANDONED MINE LAND... mitigate emergency situations or extreme danger situations arising from past mining practices and begin... Indian tribe and the Bureau of Indian Affairs office having jurisdiction over the Indian lands. (d) If a...

  8. 43 CFR 404.15 - How can I request assistance under the program?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How can I request assistance under the program? 404.15 Section 404.15 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.15 How can I...

  9. 43 CFR 404.57 - Does this rule have any affect on state water law?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... water law? 404.57 Section 404.57 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Miscellaneous § 404.57 Does this rule have any affect on state water law? No. Neither the Act nor this rule preempts or affects...

  10. 43 CFR 23.13 - Consultation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Lands: Interior Office of the Secretary of the Interior SURFACE EXPLORATION, MINING AND RECLAMATION OF... jurisdiction of an agency other than the Department of the Interior or under the jurisdiction of a bureau of the Department of the Interior other than the Bureau of Land Management, the mining supervisor or the...

  11. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sather, Nichole K.; Johnson, Gary E.; Storch, Adam

    The tidal freshwater monitoring (TFM) project reported herein is part of the research, monitoring, and evaluation effort developed by the Action Agencies (Bonneville Power Administration, the U.S. Army Corps of Engineers [USACE], and the U.S. Bureau of Reclamation) in response to obligations arising from the Endangered Species Act (ESA) as a result of operation of the Federal Columbia River Power System. The project is being performed under the auspices of the Northwest Power and Conservation Council’s Columbia Basin Fish and Wildlife Program (Project No. 2005-001-00). The research is a collaborative effort among the Pacific Northwest National Laboratory, the Oregon Departmentmore » of Fish and Wildlife, the National Marine Fisheries Service, and the University of Washington.« less

  12. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sobocinski, Kathryn L.; Johnson, Gary E.; Sather, Nichole K.

    This document is the first annual report for the study titled “Ecology of Juvenile Salmonids in Shallow Tidal Freshwater Habitats in the Vicinity of the Sandy River Delta in the Lower Columbia River.” Hereafter, we refer to this research as the Tidal Freshwater Monitoring (TFM) Study. The study is part of the research, monitoring, and evaluation effort developed by the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) in response to obligations arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The project ismore » performed under the auspices of the Northwest Power and Conservation Council’s Columbia Basin Fish and Wildlife Program.« less

  13. 78 FR 15973 - Notice of Public Scoping Meetings for the Pojoaque Basin Regional Water System Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-13

    ... Pojoaque Basin Regional Water System Environmental Impact Statement, New Mexico AGENCY: Bureau of... Environmental Policy Act of 1969, as amended, the Bureau of Reclamation is preparing an environmental impact... document, alternatives, concerns, and issues to be addressed in the environmental impact statement. DATES...

  14. Disputes over science and dispute resolution approaches - A survey of Bureau of Reclamation employees

    USGS Publications Warehouse

    Burkardt, Nina; Ruell, Emily W.

    2012-01-01

    Water resources in parts of the Western United States are over-allocated, which intensifies the pressure to support water management decisions with strong scientific evidence. Because scientific studies sometimes provide uncertain or competing results or recommendations, science can become a source of disputes during decision-making processes. The Bureau of Reclamation (Reclamation) is an important water manager in the Western United States, and Reclamation decision processes are often contested by a variety of affected constituencies. We conducted a Web-based survey of Reclamation employees to determine (1) which types of disputes over science are occurring and how common they are, (2) which approaches have been used by Reclamation to try to resolve these different types of disputes, (3) how useful Reclamation employees find these approaches at resolving these types of disputes, (4) the final outcomes of these disputes and the decision-making processes that were hindered by the disputes over science, and (5) the potential usefulness of several different types of dispute resolution resources that Reclamation could provide for employees that become involved in disputes over science. The calculated minimum response rate for the survey was 59 percent. Twenty-five percent of respondents indicated that they had been involved in a dispute over science while working at Reclamation. Native species and species listed under the Endangered Species Act of 1973 were the most common issue types reported in these disputes over science. Survey respondents indicated that they used a variety of approaches to resolve disputes over science and rated most approaches as either neutral or somewhat helpful in these endeavors. Future research is needed to determine whether there are additional variables underlying these disputes that were not measured in this survey that may identify when dispute resolution methods are most effective, or whether resolving aspects of these disputes, such as differing interpretations of science, is very difficult or impossible regardless of the dispute resolution methods used.

  15. Regression equations for estimating concentrations of selected water-quality constituents for selected gaging stations in the Red River of the North Basin, North Dakota, Minnesota, and South Dakota

    USGS Publications Warehouse

    Williams-Sether, Tara

    2004-01-01

    The Dakota Water Resources Act, passed by the U.S. Congress on December 15, 2000, authorized the Secretary of the Interior to conduct a comprehensive study of future water-quantity and quality needs of the Red River of the North Basin in North Dakota and possible options to meet those water needs. Previous Red River of the North Basin studies conducted by the Bureau of Reclamation used streamflow and water-quality data bases developed by the U.S. Geological Survey that included data for 1931-84. As a result of the recent congressional authorization and results of previous studies by the Bureau of Reclamation, redevelopment of the streamflow and water-quality data bases with current data through 1999 are needed in order to evaluate and predict the water-quantity and quality effects within the Red River of the North Basin. This report provides updated statistical summaries of selected water-quality constituents and streamflow and the regression relations between them.  Available data for 1931-99 were used to develop regression equations between 5 selected water-quality constituents and streamflow for 38 gaging stations in the Red River of the North Basin. The water-quality constituents that were regressed against streamflow were hardness (as CaCO3), sodium, chloride, sulfate, and dissolved solids. Statistical summaries of the selected water-quality constituents and streamflow for the gaging stations used in the regression equations development and the applications and limitations of the regression equations are presented in this report.

  16. Cluster analysis of water-quality data for Lake Sakakawea, Audubon Lake, and McClusky Canal, central North Dakota, 1990-2003

    USGS Publications Warehouse

    Ryberg, Karen R.

    2006-01-01

    As a result of the Dakota Water Resources Act of 2000, the Bureau of Reclamation, U.S. Department of the Interior, identified eight water-supply alternatives (including a no-action alternative) to meet future water needs in portions of the Red River of the North (Red River) Basin. Of those alternatives, four include the interbasin transfer of water from the Missouri River Basin to the Red River Basin. Three of the interbasin transfer alternatives would use the McClusky Canal, located in central North Dakota, to transport the water. Therefore, the water quality of the McClusky Canal and the sources of its water, Lake Sakakawea and Audubon Lake, is of interest to water-quality stakeholders. The Bureau of Reclamation collected water-quality samples at 23 sites on Lake Sakakawea, Audubon Lake, and the McClusky Canal system from 1990 through 2003. Physical properties and water-quality constituents from these samples were summarized and analyzed by the U.S. Geological Survey using hierarchical agglomerative cluster analysis (HACA). HACA separated the samples into related clusters, or groups. These groups were examined for statistical significance and relation to structure of the McClusky Canal system. Statistically, the sample groupings found using HACA were significantly different from each other and appear to result from spatial and temporal water-quality differences corresponding with different sections of the canal and different operational conditions. Future operational changes of the canal system may justify additional water-quality sampling to characterize possible water-quality changes.

  17. Effects of surface coal mining and reclamation on ground water in small watersheds in the Allegheny Plateau, Ohio

    USGS Publications Warehouse

    Eberle, Michael; Razem, A.C.

    1985-01-01

    The hydrologic effects of surface coal mining in unlimited areas is difficult to predict, partly because of a lack of adequate data collected before and after mining and reclamation. In order to help provide data to assess the effects of surface mining on the hydrology of small basins in the coal fields of the eastern United States, the U.S. Bureau of Mines sponsored a comprehensive hydrologic study at three sites in the Ohio part of the Eastern Coal Province. These sites are within the unqlaciated part of the Allegheny Plateau, and are representative of similar coal-producing areas in Kentucky, West Virginia, and Pennsylvania. The U.S. Geological Survey was responsible for the ground-water phase of the study. The aquifer system at each watershed consisted of two localized perched aquifers (top and middle) above a deeper, more regional aquifer. The premining top aquifer was destroyed by mining in each case, and was replaced by spoils during reclamation. The spoils formed new top aquifers that were slowly becoming resaturated at the end of the study period. Water levels in the aquifers were about the same after reclamation as before mining, although levels rose in a few places. It appears that the underclay at the base of the new top aquifers at all three sites prevents significant downward leakage from the top aquifers to lower except in places where the layer may have been damaged during mining. Water in the top aquifers is a calcium sulfate type, whereas calcium bicarbonate type water predominated before mining. The median specific conductance of water in the new top aquifers was about 5 times greater than that of the original top aquifers in two of the watersheds, and 1 1/2 times the level of the original top aquifers in the third. Concentrations of dissolved sulfate, iron, and manganese in the top aquifers before mining generally did not exceed U.S. and Ohio Environmental Protection Agency drinking-water limits, but generally exceeded these limits after reclamation. Water-quality changes in the middle aquifers were minor by comparison. Water levels and water quality in the deeper, regional aquifers were unaffected by mining.

  18. 43 CFR 404.59 - If the Secretary recommends a project for construction, is that a promise of Federal funding?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false If the Secretary recommends a project for construction, is that a promise of Federal funding? 404.59 Section 404.59 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY...

  19. 43 CFR 404.56 - If a financial assistance agreement is entered into for a rural water supply project that...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... entered into for a rural water supply project that benefits more than one Indian tribe, is the approval of... Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Miscellaneous § 404.56 If a financial assistance agreement is entered into for a rural water supply project that...

  20. 43 CFR 404.18 - How can I request assistance to conduct a feasibility study?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false How can I request assistance to conduct a feasibility study? 404.18 Section 404.18 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.18 How can I...

  1. Physical modeling of river spanning rock structures: Evaluating interstitial flow, local hydraulics, downstream scour development, and structure stability

    USGS Publications Warehouse

    Collins, K.L.; Thornton, C.I.; Mefford, B.; Holmquist-Johnson, C. L.

    2009-01-01

    Rock weir and ramp structures uniquely serve a necessary role in river management: to meet water deliveries in an ecologically sound manner. Uses include functioning as low head diversion dams, permitting fish passage, creating habitat diversity, and stabilizing stream banks and profiles. Existing information on design and performance of in-stream rock structures does not provide the guidance necessary to implement repeatable and sustainable construction and retrofit techniques. As widespread use of rock structures increases, the need for reliable design methods with a broad range of applicability at individual sites grows as well. Rigorous laboratory testing programs were implemented at the U.S. Bureau of Reclamation (Reclamation) and at Colorado State University (CSU) as part of a multifaceted research project focused on expanding the current knowledge base and developing design methods to improve the success rate of river spanning rock structures in meeting project goals. Physical modeling at Reclamation is being used to measure, predict, and reduce interstitial flow through rock ramps. CSU is using physical testing to quantify and predict scour development downstream of rock weirs and its impact on the stability of rock structures. ?? 2009 ASCE.

  2. 78 FR 72109 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... Status Report of Water Service, Repayment, and Other Water-Related Contract Actions AGENCY: Bureau of... Kelly, Water and Environmental Resources Division, Bureau of Reclamation, P.O. Box 25007, Denver... contract for the delivery of project water for authorized uses in newspapers of general circulation in the...

  3. 78 FR 72111 - Quarterly Status Report of Water Service, Repayment, and Other Water-Related Contract Actions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-02

    ... Status Report of Water Service, Repayment, and Other Water-Related Contract Actions AGENCY: Bureau of... Kelly, Water and Environmental Resources Division, Bureau of Reclamation, P.O. Box 25007, [[Page 72112... actions for any contract for the delivery of project water for authorized uses in newspapers of general...

  4. 25 CFR 211.5 - Authority and responsibility of the Office of Surface Mining Reclamation and Enforcement (OSM).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Authority and responsibility of the Office of Surface Mining Reclamation and Enforcement (OSM). 211.5 Section 211.5 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ENERGY AND MINERALS LEASING OF TRIBAL LANDS FOR MINERAL DEVELOPMENT General § 211.5 Authority and responsibility of the Office of...

  5. 25 CFR 212.5 - Authority and responsibility of the Office of Surface Mining Reclamation and Enforcement (OSM).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Authority and responsibility of the Office of Surface Mining Reclamation and Enforcement (OSM). 212.5 Section 212.5 Indians BUREAU OF INDIAN AFFAIRS, DEPARTMENT OF THE INTERIOR ENERGY AND MINERALS LEASING OF ALLOTTED LANDS FOR MINERAL DEVELOPMENT General § 212.5 Authority and responsibility of the Office...

  6. 43 CFR 404.54 - Who will hold title to a rural water project that is constructed following the completion of an...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Miscellaneous § 404.54 Who will hold title to a rural water project that is constructed following the completion of an... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Who will hold title to a rural water...

  7. 43 CFR 404.51 - Are proposed projects under the Rural Water Supply Program reviewed by the Administration?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Are proposed projects under the Rural Water Supply Program reviewed by the Administration? 404.51 Section 404.51 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Feasibility Studies § 404.51...

  8. 43 CFR 404.57 - Does this rule have any affect on state water law?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Does this rule have any affect on state water law? 404.57 Section 404.57 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Miscellaneous § 404.57 Does this rule have any affect on state water...

  9. Hydrologic data, Colorado River and major tributaries, Glen Canyon Dam to Diamond Creek, Arizona, water years 1990-95

    USGS Publications Warehouse

    Rote, John J.; Flynn, Marilyn E.; Bills, D.J.

    1997-01-01

    The U.S. Geological Survey collected hydrologic data at 12 continuous-record stations along the Colorado River and its major tributaries between Glen Canyon Dam and Diamond Creek. The data were collected from October 1989 through September 1995 as part of the Bureau of Reclamation's Glen Canyon Environmental Studies. The data include daily values for streamflow discharge, suspended-sediment discharge, temperature, specific conductance, pH, and dissolved-oxygen concentrations, and discrete values for physical properties and chemical constituents of water. All data are presented in tabular form.

  10. Surface-water quality assessment of the North Fork Red River basin upstream from Lake Altus, Oklahoma, 2002

    USGS Publications Warehouse

    Smith, S. Jerrod; Schneider, M.L.; Masoner, J.R.; Blazs, R.L.

    2003-01-01

    Elevated salinity in the North Fork Red River is a major concern of the Bureau of Reclamation W. C. Austin Project at Lake Altus. Understanding the relation between surface-water runoff, ground-water discharge, and surface-water quality is important for maintaining the beneficial use of water in the North Fork Red River basin. Agricultural practices, petroleum production, and natural dissolution of salt-bearing bedrock have the potential to influence the quality of nearby surface water. The U.S. Geological Survey, in cooperation with the Bureau of Reclamation, sampled stream discharge and water chemistry at 19 stations on the North Fork Red River and tributaries. To characterize surface-water resources of the basin in a systematic manner, samples were collected synoptically during receding streamflow conditions during July 8-11, 2002. Together, sulfate and chloride usually constitute greater than half of the dissolved solids. Concentrations of sulfate ranged from 87.1 to 3,450 milligrams per liter. The minimum value was measured at McClellan Creek near Back (07301220), and the maximum value was measured at Bronco Creek near Twitty (07301303). Concentrations of chloride ranged from 33.2 to 786 milligrams per liter. The minimum value was measured at a North Fork Red River tributary (unnamed) near Twitty (07301310), and the maximum value was measured at the North Fork Red River near Back (07301190), the most upstream sample station.

  11. Selected hydrologic data, Kolob-Alton-Kaiparowits coal-fields area, south-central Utah

    USGS Publications Warehouse

    Plantz, Gerald G.

    1983-01-01

    The Kolob-Alton-Kaiparowits coal-field area (pi. 1) includes about 4,500 square miles in parts of the Colorado River Basin and the Great Basin. The area varies in altitude from less than 4,000 to more than 10,000 feet, and is comprised chiefly of plateaus, benches, and terraces that are dissected by deep, narrow canyons. Principal streams draining the area are the Virgin, Sevier, Escalante, and Paria Rivers, and Coal, Kanab, and Wahweap Creeks.Most of the data included in this report were collected by the U.S. Geological Survey from October 1980 to September 1982. They were collected as part of a hydrologic study in cooperation with the U.S. Bureau of Land Management to evaluate potential impacts of coal mining on the area's water resources. The results of that study are to be published in a separate report.Several earlier coal-related hydrologic studies have been made in the Alton and Kolob coal-fields area. Hydrologic data collected during those studies may be found in the following reports: Goode (1964, 1966), Sandberg (1979), and Cordova (1981). Data collected at the streamflow-gaging stations shown on plate 1 are published separately in annual reports of the U.S. Geological Survey. Information about the availability of these data is given in table 8.The writer extends thanks to Judy Steiger and Dave Darby (former employees of the U.S. Geological Survey) for their contribution to this report. Officials of the following companies and agencies also were helpful and cooperative in providing data: Utah Power & Light Co.; El Paso Natural Gas Co.; U.S. Bureau of Reclamation; and U.S. Bureau of Land Management.

  12. 43 CFR 404.58 - Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006 have to comply with the requirements in this rule? 404.58 Section 404.58 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION...

  13. 43 CFR 404.58 - Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006 have to comply with the requirements in this rule? 404.58 Section 404.58 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION...

  14. 43 CFR 404.58 - Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006 have to comply with the requirements in this rule? 404.58 Section 404.58 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION...

  15. 43 CFR 404.58 - Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006...

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Do rural water projects authorized before the enactment of the Rural Water Supply Act of 2006 have to comply with the requirements in this rule? 404.58 Section 404.58 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION...

  16. 43 CFR 404.10 - Are there certain types of infrastructure and facilities that may not be included in a rural...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Are there certain types of infrastructure and facilities that may not be included in a rural water supply project? 404.10 Section 404.10 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM...

  17. 43 CFR 404.9 - What types of infrastructure and facilities may be included in an eligible rural water supply...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false What types of infrastructure and facilities may be included in an eligible rural water supply project? 404.9 Section 404.9 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.9...

  18. 43 CFR 404.9 - What types of infrastructure and facilities may be included in an eligible rural water supply...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true What types of infrastructure and facilities may be included in an eligible rural water supply project? 404.9 Section 404.9 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM Overview § 404.9 Wha...

  19. 43 CFR 404.10 - Are there certain types of infrastructure and facilities that may not be included in a rural...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Are there certain types of infrastructure and facilities that may not be included in a rural water supply project? 404.10 Section 404.10 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL WATER SUPPLY PROGRAM...

  20. Photographic copy of photograph, Joseph Yolo, photographer, 1936 (original print ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photographic copy of photograph, Joseph Yolo, photographer, 1936 (original print located at U.S. Bureau of Reclamation Upper Columbia Area Office, Yakima, Washington). "WAHT A GOVERNMENT CANAL AND AN ASSURED WATER SUPPLY WILL DO IN A DESERT AREA IS SHOWN IN THIS AIR VIEW OF A SECTION OF THE YAKIMA FEDERAL RECLAMATION PROJECT IN CENTRAL WASHINGTON. THE MAIN CANAL IS SEEN RUNNING DOWN THE MIDDLE OF THE VALLEY WITH PATCHES OF ORCHARDS AND FIELDS ON EITHER SIDE, BUT ABOVE THE CANAL LINE THE SAGE BRUSH DESERT REMAINS, AS CAN BE SEEN ON THE LEFT. THE YAKIMA PROJECT SUPPORTS MORE THAN 110,000 PEOPLE IN A TERRITORY WHICH WAS DESERT 35 YEARS AGO. MANY OF THE ORIGINAL SETTLERS WHO CAME, LIKE THOSE WHO ARE NOW SETTLING ON THE VALE PROJECT, TO BREAK THE RAW DESERT LAND, ARE STILL LIVING ON THESE NEATLY CHECKERBOARDED FARMS" - Kachess Dam, Kachess River, 1.5 miles north of Interstate 90, Easton, Kittitas County, WA

  1. 2011 Georgiana Slough non-physical barrier performance evaluation project report

    USGS Publications Warehouse

    Reeves, Ryan R.; McQuirk, Jacob; Ameri, Khalid; Perry, Russell W.; Romine, Jason G.; Liedtke, Theresa L.; Burau, Jon R.; Blake, Aaron R.; Fitzer, Chris; Smith, Natalie; Pagliughi, Steve; Johnston, Sam; Kumagai, Kevin; Cash, Kenneth

    2012-01-01

    Under the ESA, the National Marine Fisheries Service (NMFS) issued the 2009 Biological and Conference Opinion for the Long‐Term Operations of the Central Valley Project and State Water Project (BO) for Chinook salmon and other listed anadromous fish species (NMFS 2009). Reasonable and Prudent Alternative (RPA) Action IV.1.3 of the BO requires the California Department of Water Resources (DWR) and the U.S. Bureau of Reclamation (Reclamation) to consider engineering solutions to reduce the diversion of juvenile salmonids from the Sacramento River into the interior and south Delta. DWR implemented the 2011 Georgiana Slough NonPhysical Barrier (GSNPB) Study to test the effectiveness of using a non-physical barrier, referred to as a behavioral Bio-Acoustic Fish Fence (BAFF), that combines three stimuli to deter juvenile Chinook salmon from entering Georgiana Slough: sound, high-intensity modulated light (previously known as stroboscopic light), and a bubble curtain. This report presents the results of the experimental tests conducted in 2011.

  2. 43 CFR 404.8 - Are there any exceptions that would allow a community with greater than 50,000 inhabitants to be...

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Are there any exceptions that would allow a community with greater than 50,000 inhabitants to be part of an eligible rural water supply project? 404.8 Section 404.8 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURA...

  3. 43 CFR 404.8 - Are there any exceptions that would allow a community with greater than 50,000 inhabitants to be...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Are there any exceptions that would allow a community with greater than 50,000 inhabitants to be part of an eligible rural water supply project? 404.8 Section 404.8 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR RECLAMATION RURAL...

  4. Use of decision support systems as a drought management tool

    USGS Publications Warehouse

    Frevert, D.; Lins, H.; ,

    2005-01-01

    Droughts present a unique challenge to water managers throughout the world and the current drought in the western United States is taxing facilities to the limit. Coping with this severe drought requires state of the art decision support systems including efficient and accurate hydrologic process models, detailed hydrologic data bases and effective river systems management modeling frameworks. This paper will outline a system of models developed by the Bureau of Reclamation, the US Geological Survey, the University of Colorado and a number of other governmental and university partners. The application of the technology to drought management in several key western river basins will be discussed.

  5. Decision analysis to support development of the Glen Canyon Dam long-term experimental and management plan

    USGS Publications Warehouse

    Runge, Michael C.; LaGory, Kirk E.; Russell, Kendra; Balsom, Janet R.; Butler, R. Alan; Coggins,, Lewis G.; Grantz, Katrina A.; Hayse, John; Hlohowskyj, Ihor; Korman, Josh; May, James E.; O'Rourke, Daniel J.; Poch, Leslie A.; Prairie, James R.; VanKuiken, Jack C.; Van Lonkhuyzen, Robert A.; Varyu, David R.; Verhaaren, Bruce T.; Veselka, Thomas D.; Williams, Nicholas T.; Wuthrich, Kelsey K.; Yackulic, Charles B.; Billerbeck, Robert P.; Knowles, Glen W.

    2016-01-07

    The results of the decision analysis are meant to serve as only one of many sources of information that can be used to evaluate the alternatives proposed in the Environmental Impact Statement. These results only focus on those resource goals for which quantitative performance metrics could be formulated and evaluated; there are other important aspects of the resource goals that also need to be considered. Not all the stakeholders who were invited to participate in the decision analysis chose to do so; thus, the Bureau of Reclamation, National Park Service, and U.S. Department of Interior may want to consider other input.

  6. Selenium in Reservoir Sediment from the Republican River Basin

    USGS Publications Warehouse

    Juracek, Kyle E.; Ziegler, Andrew C.

    1998-01-01

    Reservoir sediment quality is an important environmental concern because sediment may act as both a sink and a source of water-quality constituents to the overlying water column and biota. Once in the food chain, sediment-derived constituents may pose an even greater concern due to bioaccumulation. An analysis of reservoir bottom sediment can provide historical information on sediment deposition as well as magnitudes and trends in constituents that may be related to changes in human activity in the basin. The assessment described in this fact sheet was initiated in 1997 by the U.S. Geological Survey (USGS), in cooperation with the Bureau of Reclamation (BOR), U.S. Department of the Interior, to determine if irrigation activities have affected selenium concentrations in reservoir sediment of the Republican River Basin of Colorado, Kansas, and Nebraska.

  7. 78 FR 16483 - Notice of Availability of the Draft Uranium Leasing Program Programmatic Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ...The U.S. Department of Energy (DOE) announces the availability of the Draft Uranium Leasing Program Programmatic Environmental Impact Statement (Draft ULP PEIS, DOE/EIS-0472D), for public comment. DOE is also announcing the dates, times, and locations for public hearings to receive comments on the Draft ULP PEIS. DOE has prepared the Draft ULP PEIS pursuant to the National Environmental Policy Act of 1969 (NEPA), the Council on Environmental Quality's (CEQ's) NEPA regulations (40 CFR parts 1500-1508), and DOE's NEPA implementing procedures (10 CFR part 1021) to analyze the reasonably foreseeable potential environmental impacts, including the site-specific impacts, of the range of reasonable alternatives for the management of the ULP. DOE's ULP administers 31 tracts of land covering an aggregate of approximately 25,000 acres (10,000 ha) in Mesa, Montrose, and San Miguel Counties in western Colorado for exploration, mine development, operations, and reclamation of uranium mines. The cooperating agencies on this ULP PEIS are the: U.S. Department of the Interior (DOI), Bureau of Land Management (BLM); U.S. Environmental Protection Agency (EPA); Colorado Department of Transportation; Colorado Division of Reclamation, Mining, and Safety; Colorado Parks and Wildlife ; Mesa County Commission; Montrose County Commission; San Juan County Commission; San Miguel County Board of Commissioners; Pueblo of Acoma Tribe; Pueblo de Cochiti Tribe; Pueblo de Isleta Tribe; Navajo Nation; and Southern Ute Indian Tribe.

  8. 43 CFR 428.10 - Districts' responsibilities concerning certain formerly excess land.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR INFORMATION REQUIREMENTS FOR CERTAIN FARM...' responsibilities concerning certain formerly excess land. Districts must not make irrigation water available to...

  9. 43 CFR 428.10 - Districts' responsibilities concerning certain formerly excess land.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR INFORMATION REQUIREMENTS FOR CERTAIN FARM...' responsibilities concerning certain formerly excess land. Districts must not make irrigation water available to...

  10. Selected ground-water information for the Pasco basin and adjacent areas, Washington, 1986-1989

    USGS Publications Warehouse

    Drost, B.W.; Schurr, K.M.; Lum, W. E.

    1989-01-01

    The U.S. Geological Survey, in cooperation with the United States Department of Energy, conducted a study of the Pasco basin and adjacent areas, Washington, in support of the Basalt Waste Isolation Project at the Hanford site, Washington. The purpose of the study was to develop a data set that would help define the groundwater-flow system of the Pasco Basin. This report contains the basic data, without interpretation, that were collected from the start of the project in February 1986 through January 1989. Information presented is from the U.S. Bureau of Reclamation, State of Washington Department of Ecology , US Army Corps of Engineers, Kennewick Irrigation District, and the Survey, and consists of well location and construction data, records of water levels in the wells, and aquifer designations for each well. The aquifer designation represents the geohydrologic unit to which the well is reported to be open. (USGS)

  11. Bureau of Reclamation Hydropower Development Equity and Jobs Act

    THOMAS, 113th Congress

    Sen. Barrasso, John [R-WY

    2014-02-10

    Senate - 07/31/2014 Placed on Senate Legislative Calendar under General Orders. Calendar No. 516. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  12. 75 FR 25877 - Colorado River Basin Salinity Control Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-10

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Colorado River Basin Salinity Control Advisory... River Basin Salinity Control Advisory Council (Council) was established by the Colorado River Basin Salinity Control [[Page 25878

  13. NPDES Permit for Yellowtail Visitor Center Wastewater Treatment Facility in Montana

    EPA Pesticide Factsheets

    NPDES permit MT-0029106 for United States Bureau of Reclamation discharge from its Yellowtail Visitor Center wastewater treatment facility into the Bighorn Lake/Bighorn River in Big Horn County, Montana.

  14. Bureau of Reclamation Fish Recovery Programs Reauthorization Act of 2009

    THOMAS, 111th Congress

    Sen. Bingaman, Jeff [D-NM

    2009-07-14

    Senate - 03/02/2010 Placed on Senate Legislative Calendar under General Orders. Calendar No. 292. (All Actions) Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  15. Bureau of Reclamation Conduit Hydropower Development Equity and Jobs Act

    THOMAS, 113th Congress

    Rep. Daines, Steve [R-MT-At Large

    2013-05-14

    Senate - 07/31/2014 Placed on Senate Legislative Calendar under General Orders. Calendar No. 518. (All Actions) Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:

  16. Collected Papers on Wind Turbine Technology

    NASA Technical Reports Server (NTRS)

    Spera, David A. (Editor)

    1995-01-01

    R and D projects on electricity generating wind turbines were conducted at the NASA Lewis Research Center from 1973 to 1988. Most projects were sponsored by the U.S. Department of Energy (DOE), a major element of its Federal Wind Energy Program. Another large wind turbine project was by the Bureau of Reclamation of the U.S. Department of Interior (DOI). From 1988 to 1995, NASA wind energy activities have been directed toward the transfer of technology to commercial and academic organizations. As part of these technology transfer activities, previously unpublished manuscripts have been assembled and presented here to share the wind turbine research results with the wind energy community. A variety of wind turbine technology topics are discussed: Wind and wake models; Airfoil properties; Structural analysis and testing; Control systems; Variable speed generators; and acoustic noise. Experimental and theoretical results are discussed.

  17. 25 CFR 216.3 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... AFFAIRS, DEPARTMENT OF THE INTERIOR ENERGY AND MINERALS SURFACE EXPLORATION, MINING, AND RECLAMATION OF... means the superintendent or other officer of the Bureau of Indian Affairs having jurisdiction under delegated authority, over the lands involved. (b) Mining supervisor means the Regional Mining Supervisor, or...

  18. 43 CFR 423.2 - Definitions of terms used in this part.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF THE INTERIOR PUBLIC CONDUCT ON BUREAU OF RECLAMATION FACILITIES, LANDS, AND WATERBODIES Purpose... archaeology, anthropology, history, or other associated disciplines. Cultural resources include archaeological..., ethnography, history, documents, botany, paleontology, geology, and environmental samples. Natural resources...

  19. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.

    The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. The EOS is one of multiple work groups in the federal research, monitoring, and evaluation (RME)more » effort developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the FCRPS. The EOS is tasked by NOAA Fisheries and the Action Agencies to design and coordinate implementation of the federal RME plan for the lower Columbia River and estuary, including the plume.« less

  20. Processed 1938 aerial photography for selected areas of the lower Colorado River, southwestern United States

    USGS Publications Warehouse

    Norman, Laura M.; Gishey, Michael; Gass, Leila; Yanites, Brian; Pfeifer, Edwin; Simms, Ron; Ahlbrandt, Ray

    2006-01-01

    The U.S. Geological Survey (USGS) initiated a study of the Lower Colorado River to derive temporal-change characteristics from the predam period to the present. In this report, we present summary information on accomplishments under a USGS task for the Department of the Interior's Landscapes in the West project. We discuss our preliminary results in compiling a digital database of geospatial information on the Lower Colorado River and acquisition of data products, and present a geospatial digital dataset of 1938 aerial photography of the river valley. The U.S. Bureau of Reclamation (BOR)'s, Resources Management Office in Boulder City, Nev., provided historical aerial photographs of the river valley from the Hoover Dam to the United States-Mexican border, with some exclusions. USGS authors scanned and mosaicked the photographs, registered the photo mosaics, and created metadata describing each mosaic series, all 15 of which are presented here.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Sather, Nichole K.

    This project covers facilitation of the Estuary/Ocean Subgroup (EOS) for federal research, monitoring, and evaluation (RME) and the Expert Regional Technical Group (ERTG) for estuary habitat restoration. The EOS is part of the research, monitoring, and evaluation effort that the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers [Corps], U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The EOS is tasked by National Marine Fisheries Service (NMFS) and the Action Agencies (AAs) to design and coordinate implementation ofmore » the federal RME plan for the lower Columbia River and estuary, including the river’s plume in the ocean. Initiated in 2002, the EOS is composed of members from BPA, the Corps, NMFS, and Pacific Northwest National Laboratory’s (PNNL’s) Marine Sciences Laboratory, and other agencies as necessary.« less

  2. Forecast-Informed Reservoir Operations: Lessons Learned from a Multi-Agency Collaborative Research and Operations Effort to improve Flood Risk Management, Water Supply and Environmental Benefits

    NASA Astrophysics Data System (ADS)

    Talbot, C. A.; Ralph, M.; Jasperse, J.; Forbis, J.

    2017-12-01

    Lessons learned from the multi-agency Forecast-Informed Reservoir Operations (FIRO) effort demonstrate how research and observations can inform operations and policy decisions at Federal, State and Local water management agencies with the collaborative engagement and support of researchers, engineers, operators and stakeholders. The FIRO steering committee consists of scientists, engineers and operators from research and operational elements of the National Oceanographic and Atmospheric Administration and the US Army Corps of Engineers, researchers from the US Geological Survey and the US Bureau of Reclamation, the state climatologist from the California Department of Water Resources, the chief engineer from the Sonoma County Water Agency, and the director of the Scripps Institution of Oceanography's Center for Western Weather and Water Extremes at the University of California-San Diego. The FIRO framework also provides a means of testing and demonstrating the benefits of next-generation water cycle observations, understanding and models in water resources operations.

  3. Determination of total mercury in fillets of sport fishes collected from Folsom and New Melones Reservoirs, California, 2004

    USGS Publications Warehouse

    May, Thomas W.; Brumbaugh, William G.

    2007-01-01

    This report presents the results of a study by the U.S. Geological Survey, done in cooperation with the U.S. Bureau of Reclamation, to determine mercury concentrations in selected sport fishes from Folsom and New Melones Reservoirs in California. Fillets were collected from each fish sample, and after homogenization and lyophilization of fish fillets, mercury concentrations were determined with a direct mercury analyzer utilizing the process of thermal combustion-gold amalgamation atomic absorption spectroscopy. Mercury concentrations in fish fillets from Folsom Reservoir ranged from 0.09 to 1.16 micrograms per gram wet weight, and from New Melones Reservoir ranged from 0.03 to 0.94 microgram per gram wet weight. Most of the fish fillets from Folsom Reservoir (87 percent) and 27 percent of the fillets from New Melones Reservoir exceeded the U.S. Environmental Protection Agency's fish consumption advisory of 0.30 microgram per gram wet weight.

  4. Preliminary maps showing ground-water resources in the Lower Colorado River region, Arizona, Nevada, New Mexico, and Utah

    USGS Publications Warehouse

    Brown, S.G.

    1976-01-01

    This atlas was prepared to meet the need for information on the areal distribution, quantity, and availability of ground water in the lower Colorado River region, an area of about 140,000 square miles in parts of Arizona, Nevada, New Mexico, and Utah. The maps are necessarily generalized in places owing to the lack of sufficient data. In general the geohydrologic information pertains to large areas, and local exceptions occur. Users needing more detailed information for specific areas may address inquiries to the district chief of the U.S. Geological Survey at the addresses given in the section “Selected References.” The maps were prepared using data from previously published reports, data collected by other Federal State, and local agencies, and data from the files of the U.S. Geological Survey offices in Arizona, Nevada, New Mexico, and Utah. The report is the result of the lower Colorado River region Type I framework study made in cooperation with the U.S. Bureau of Reclamation.

  5. Determination of total mercury in fillets of sport fishes collected from Folsom Reservoir, California, 2006

    USGS Publications Warehouse

    May, Thomas W.; Brumbaugh, William G.

    2007-01-01

    This report presents the results of a study by the U.S. Geological Survey, done in cooperation with the U.S. Bureau of Reclamation, to determine mercury concentrations in selected sport fishes from Folsom Reservoir in California. Fillets were collected from each fish sample, and after homogenization and lyophilization of fish fillets, mercury concentrations were determined with a direct mercury analyzer utilizing the process of thermal combustion-gold amalgamation atomic absorption spectroscopy. Mercury concentrations in fillets ranged from 0.031 to 0.20 micrograms per gram wet weight in rainbow trout (Oncorhynchus mykiss) samples and 0.071 to 0.16 micrograms per gram wet weight in bluegill (Lepomis macrochirus) samples. Mercury concentration was 0.98 microgram per gram wet weight in a single spotted bass (Micropterus punctulatus) sample, which was the only one in the sample set which exceeded the U.S. Environmental Protection Agency's fish consumption advisory of 0.30 microgram per gram wet weight.

  6. 40. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    40. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). ROOF PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  7. 38. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    38. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). FIRST FLOOR PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  8. 37. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). BASEMENT PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  9. 39. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    39. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). SECOND FLOOR PLAN. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  10. 45. Photographic copy of original construction drawing, dated 16 February ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    45. Photographic copy of original construction drawing, dated 16 February 1916 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). LOT SURVEY. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  11. 41. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    41. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). CROSS SECTIONS. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  12. 78 FR 1594 - Semiannual Regulatory Agenda

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-08

    ... Ocean Energy Management--Completed Actions Regulation Sequence No. Title Identifier No. 328 Revised Requirements for 1010-AD61 Well Plugging and Platform Decommissioning. Office of Surface Mining Reclamation and... DEPARTMENT OF THE INTERIOR (DOI) Bureau of Ocean Energy Management (BOEM) Completed Actions 328. Revised...

  13. 75 FR 53332 - San Carlos Irrigation Project, Arizona

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-31

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation San Carlos Irrigation Project, Arizona AGENCY..., as amended, on the rehabilitation of San Carlos Irrigation Project (SCIP) water delivery facilities... convey irrigation water from the Gila River and Central Arizona Project (CAP) to agricultural lands in...

  14. 78 FR 63491 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-24

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review: Westside... project contractors using best available cost-effective technology and best management practices.'' These...

  15. 78 FR 21414 - Central Valley Project Improvement Act, Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-10

    ... Valley Project Improvement Act, Water Management Plans AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of availability. SUMMARY: The following Water Management Plans are available for review... establish and administer an office on Central Valley Project water conservation best management practices...

  16. Ground-water data collected in the Missouri River Basin units in Kansas during 1954

    USGS Publications Warehouse

    Mason, B.J.; Loye, Linda

    1955-01-01

    Ground water studies in the Missouri River basin were begun by the United States Geological Survey during the fall of 1945 as a part of a program for the development of the resources of the basin by the United States Bureau of  Reclamation and other federal agencies. The studies of ground-water resources in the part of Kansas that lies within the Missouri River basin have been coordinated with the cooperative program of ground-water studies which were already being made in Kansas by the U.S Geological Survey, the Kansas State Geological Survey, the Division of Sanitation of the Kansas Board of Health and the Division of Water Resources of the Kansas State Board of Agriculture.  

  17. 43 CFR 422.2 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... (CLEO) means the highest level duly authorized law enforcement officer for a non-Department law enforcement agency. (f) Law Enforcement Officer means: (1) A duly authorized Federal law enforcement officer... LAW ENFORCEMENT AUTHORITY AT BUREAU OF RECLAMATION PROJECTS § 422.2 Definitions. (a) Department means...

  18. 44. Photographic copy of original construction drawing, dated August 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Photographic copy of original construction drawing, dated August 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). PLANS AND SECTIONS OF VAULTS. - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  19. 43 CFR 424.1 - Regulations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Regulations. 424.1 Section 424.1 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR REGULATIONS PERTAINING TO STANDARDS FOR THE PREVENTION, CONTROL, AND ABATEMENT OF ENVIRONMENTAL POLLUTION OF...

  20. 43 CFR 424.1 - Regulations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Regulations. 424.1 Section 424.1 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR REGULATIONS PERTAINING TO STANDARDS FOR THE PREVENTION, CONTROL, AND ABATEMENT OF ENVIRONMENTAL POLLUTION OF...

  1. 43 CFR 424.1 - Regulations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Regulations. 424.1 Section 424.1 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR REGULATIONS PERTAINING TO STANDARDS FOR THE PREVENTION, CONTROL, AND ABATEMENT OF ENVIRONMENTAL POLLUTION OF...

  2. 43 CFR 424.1 - Regulations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Regulations. 424.1 Section 424.1 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR REGULATIONS PERTAINING TO STANDARDS FOR THE PREVENTION, CONTROL, AND ABATEMENT OF ENVIRONMENTAL POLLUTION OF...

  3. 43 CFR 424.1 - Regulations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Regulations. 424.1 Section 424.1 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR REGULATIONS PERTAINING TO STANDARDS FOR THE PREVENTION, CONTROL, AND ABATEMENT OF ENVIRONMENTAL POLLUTION OF...

  4. 43 CFR 423.42 - Gambling.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Gambling. 423.42 Section 423.42 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR... Gambling. Commercial gambling in any form, or the operation of gambling devices, is prohibited on...

  5. 43 CFR 423.42 - Gambling.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Gambling. 423.42 Section 423.42 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR... Gambling. Commercial gambling in any form, or the operation of gambling devices, is prohibited on...

  6. 43 CFR 423.42 - Gambling.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Gambling. 423.42 Section 423.42 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR... Gambling. Commercial gambling in any form, or the operation of gambling devices, is prohibited on...

  7. 43 CFR 423.42 - Gambling.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Gambling. 423.42 Section 423.42 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR... Gambling. Commercial gambling in any form, or the operation of gambling devices, is prohibited on...

  8. 43 CFR 423.42 - Gambling.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Gambling. 423.42 Section 423.42 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR... Gambling. Commercial gambling in any form, or the operation of gambling devices, is prohibited on...

  9. 76 FR 24515 - Colorado River Basin Salinity Control Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-02

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Colorado River Basin Salinity Control Advisory... Basin Salinity Control Advisory Council (Council) will meet as detailed below. The meeting of the... INFORMATION: The Colorado River Basin Salinity Control Advisory Council was established by the Colorado River...

  10. Navajo Generating Station and Federal Resource Planning; Volume 1: Sectoral, Technical, and Economic Trends

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hurlbut, David; Haase, Scott; Barrows, Clayton

    This study for the U.S. Bureau of Reclamation examines conditions in the electricity sector that are likely to affect federal decisions with respect to Navajo Generating Station (NGS), the largest coal-fired power plant operating in the western United States. The federal government owns 24.3% of the 2.25-gigawatt plant, which amounts to 547 megawatts (MW) of capacity. By focusing on the unique public interests that depend on the federal share of NGS, this baseline study can help the federal government develop a road map for meeting all of its goals with respect to water delivery, clean energy, emission reduction, and economicmore » development. There is no recommendation for action in this report. Rather, its aim is to provide a credible, thorough description of baseline conditions that might affect federal decisions regarding NGS. It describes facts and trends embedded in current data, but there are no conclusions about how Reclamation or DOI should respond to the trends. The interdependencies among the many sectoral trends and federal goals are complex, and the aim of this study is to provide a foundation from which options can be tested in a deliberate manner.« less

  11. 43 CFR 417.6 - General regulations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false General regulations. 417.6 Section 417.6 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION MEASURES WITH LOWER BASIN...

  12. 43 CFR 417.6 - General regulations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false General regulations. 417.6 Section 417.6 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION MEASURES WITH LOWER BASIN...

  13. 43 CFR 417.6 - General regulations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false General regulations. 417.6 Section 417.6 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION MEASURES WITH LOWER BASIN...

  14. 43 CFR 417.6 - General regulations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true General regulations. 417.6 Section 417.6 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION MEASURES WITH LOWER BASIN...

  15. 43 CFR 417.6 - General regulations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false General regulations. 417.6 Section 417.6 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION MEASURES WITH LOWER BASIN...

  16. 43 CFR 431.9 - Future regulations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Future regulations. 431.9 Section 431.9 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR GENERAL REGULATIONS FOR POWER GENERATION, OPERATION, MAINTENANCE, AND REPLACEMENT AT THE BOULDER...

  17. 43 CFR 431.9 - Future regulations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Future regulations. 431.9 Section 431.9 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR GENERAL REGULATIONS FOR POWER GENERATION, OPERATION, MAINTENANCE, AND REPLACEMENT AT THE BOULDER...

  18. Irrigated acreage and other land uses on the Snake River Plain, Idaho and eastern Oregon

    USGS Publications Warehouse

    Lindholm, Gerald F.; Goodell, S.A.

    1986-01-01

    Prompted by the need for a current, accurate, and repeatable delineation of irrigated acreage on the Snake River Plain, the U.S. Geological Survey entered into a cooperative agreement with the Idaho Department of Water Resources Image Analysis Facility and the U.S. Bureau of Reclamation to delineate 1980 land use form Landsat data. Irrigated acreage data were needed as input to groundwater flow models developed by the U.S. Geological Survey in a study of the regional aquifer system underlying the Snake River Plain. Single-date digital multispectral scanner data analyzed to delineate land-use classes. Source of irrigation water (surface water, ground water, and combined) was determined from county maps of 1975 water-related land use, data from previous investigations, and field checking. Surface-water diversions for irrigation on the Snake River Plain began in the 1840's. With the stimulus of Federal aid authorized by the Desert Land Act, Carey Act, and Reclamation Act, irrigated area increased rapidly in the early 1900's. By 1929, 2.2 million acres were irrigated. Ground water became and important source of irrigation water after World War II. In 1980, about 3.1 million acres of the Snake River Plain were irrigate: 2.0 million acres with surface water, 1.0 million with ground water, and 0.1 million with combined surface and ground water. About 5.2 million acres (half of the plain) are undeveloped rangeland, 1.0 million acres (one-tenth) are classified as barren. The remaining land is a mixture of dryland agriculture, water bodies, wetland, forests, and urban areas.

  19. Updates to watershed modeling in the Potholes Reservoir basin, Washington-a supplement to Scientific Investigation Report 2009-5081

    USGS Publications Warehouse

    Mastin, Mark

    2012-01-01

    A previous collaborative effort between the U.S. Geological Survey and the Bureau of Reclamation resulted in a watershed model for four watersheds that discharge into Potholes Reservoir, Washington. Since the model was constructed, two new meteorological sites have been established that provide more reliable real-time information. The Bureau of Reclamation was interested in incorporating this new information into the existing watershed model developed in 2009, and adding measured snowpack information to update simulated results and to improve forecasts of runoff. This report includes descriptions of procedures to aid a user in making model runs, including a description of the Object User Interface for the watershed model with details on specific keystrokes to generate model runs for the contributing basins. A new real-time, data-gathering computer program automates the creation of the model input files and includes the new meteorological sites. The 2009 watershed model was updated with the new sites and validated by comparing simulated results to measured data. As in the previous study, the updated model (2012 model) does a poor job of simulating individual storms, but a reasonably good job of simulating seasonal runoff volumes. At three streamflow-gaging stations, the January 1 to June 30 retrospective forecasts of runoff volume for years 2010 and 2011 were within 40 percent of the measured runoff volume for five of the six comparisons, ranging from -39.4 to 60.3 percent difference. A procedure for collecting measured snowpack data and using the data in the watershed model for forecast model runs, based on the Ensemble Streamflow Prediction method, is described, with an example that uses 2004 snow-survey data.

  20. 20. PECOS RIVER FLUME Photographic copy of construction drawing ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    20. PECOS RIVER FLUME - Photographic copy of construction drawing dated February 1905 (from aperture card located at Bureau of Reclamation, Salt Lake City, Utah) EXTENSION OF CONCRETE AQUEDUCT - Carlsbad Irrigation District, Pecos River Flume, On Main Canal, .5 mile North of Carlsbad, Carlsbad, Eddy County, NM

  1. 75 FR 38543 - Klamath Hydroelectric Settlement Agreement, Including Secretarial Determination on Whether To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Klamath Hydroelectric Settlement Agreement, Including Secretarial Determination on Whether To Remove Four Dams on the Klamath River in California and Oregon AGENCY: Department of the Interior. ACTION: Notice; correction. SUMMARY: The Department of the...

  2. 56. McMILLAN DAM Photographic copy of construction drawing c1908 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    56. McMILLAN DAM - Photographic copy of construction drawing c1908 (from aperture card located at Bureau of Reclamation, Salt Lake City) McMILLAN RESERVOIR HEADGATES - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  3. 78 FR 70574 - Colorado River Basin Salinity Control Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-26

    ...] Colorado River Basin Salinity Control Advisory Council AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of public meeting. SUMMARY: The Colorado River Basin Salinity Control Advisory Council (Council) was established by the Colorado River Basin Salinity Control Act of 1974 (Pub. L.93-320) (Act) to...

  4. 77 FR 61784 - Colorado River Basin Salinity Control Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-11

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Colorado River Basin Salinity Control Advisory... River Basin Salinity Control Advisory Council (Council) was established by the Colorado River Basin Salinity Control Act of 1974 (Pub. L. 93-320) (Act) to receive reports and advise Federal agencies on...

  5. 77 FR 23508 - Colorado River Basin Salinity Control Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-19

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Colorado River Basin Salinity Control Advisory... River Basin Salinity Control Advisory Council (Council) was established by the Colorado River Basin Salinity Control Act of 1974 (Pub. L. 93-320) (Act) to receive reports and advise Federal agencies on...

  6. 78 FR 23784 - Colorado River Basin Salinity Control Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-22

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Colorado River Basin Salinity Control Advisory... River Basin Salinity Control Advisory Council (Council) was established by the Colorado River Basin Salinity Control Act of 1974 (Public Law 93-320) (Act) to receive reports and advise Federal agencies on...

  7. 75 FR 66389 - Colorado River Basin Salinity Control Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-28

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Colorado River Basin Salinity Control Advisory... River Basin Salinity Control Advisory Council (Council) was established by the Colorado River Basin Salinity Control Act of 1974 (Pub. L. 93-320) (Act) to receive reports and advise Federal agencies on...

  8. 75 FR 27360 - Colorado River Basin Salinity Control Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-14

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Colorado River Basin Salinity Control Advisory... River Basin Salinity Control Advisory Council (Council) was established by the Colorado River Basin Salinity Control Act of 1974 (Pub. L. 93-320) (Act) to receive reports and advise Federal agencies on...

  9. 76 FR 61382 - Colorado River Basin Salinity Control Advisory Council

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Colorado River Basin Salinity Control Advisory...: The Colorado River Basin Salinity Control Advisory Council (Council) was established by the Colorado River Basin Salinity Control Act of 1974 (Pub. L. 93-320) (Act) to receive reports and advise Federal...

  10. Bureau of Reclamation Small Conduit Hydropower Development and Rural Jobs Act of 2012

    THOMAS, 112th Congress

    Rep. Tipton, Scott R. [R-CO-3

    2011-09-06

    Senate - 09/19/2012 Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held. With printed Hearing: S.Hrg. 112-624. (All Actions) Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:

  11. 43 CFR 3622.3 - Designation of areas.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) FREE USE OF PETRIFIED WOOD Free Use of Petrified Wood... Bureau of Reclamation are open to or available for free use removal of petrified wood unless otherwise... cancellations of free use areas for petrified wood on lands under their jurisdiction. (c) The Secretary of the...

  12. 43 CFR 3622.3 - Designation of areas.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) FREE USE OF PETRIFIED WOOD Free Use of Petrified Wood... Bureau of Reclamation are open to or available for free use removal of petrified wood unless otherwise... cancellations of free use areas for petrified wood on lands under their jurisdiction. (c) The Secretary of the...

  13. 43 CFR 3622.3 - Designation of areas.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) FREE USE OF PETRIFIED WOOD Free Use of Petrified Wood... Bureau of Reclamation are open to or available for free use removal of petrified wood unless otherwise... cancellations of free use areas for petrified wood on lands under their jurisdiction. (c) The Secretary of the...

  14. 43 CFR 3622.3 - Designation of areas.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., DEPARTMENT OF THE INTERIOR MINERALS MANAGEMENT (3000) FREE USE OF PETRIFIED WOOD Free Use of Petrified Wood... Bureau of Reclamation are open to or available for free use removal of petrified wood unless otherwise... cancellations of free use areas for petrified wood on lands under their jurisdiction. (c) The Secretary of the...

  15. 81. AVALON DAM Photographic copy of construction drawing c1908 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    81. AVALON DAM - Photographic copy of construction drawing c1908 (from aperture card located at Bureau of Reclamation, Salt Lake City) UNTITLED DRAWING OF AUTOMATIC FLOOD GATES. GATE DETAILS - Carlsbad Irrigation District, Avalon Dam, On Pecos River, 4 miles North of Carlsbad, Carlsbad, Eddy County, NM

  16. 80. AVALON DAM Photographic copy of construction drawing c1908 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    80. AVALON DAM - Photographic copy of construction drawing c1908 (from aperture card located at Bureau of Reclamation, Salt Lake City). UNTITLED DRAWING OF AUTOMATIC FLOOD GATES. PARTIAL PLAN AND ELEVATION - Carlsbad Irrigation District, Avalon Dam, On Pecos River, 4 miles North of Carlsbad, Carlsbad, Eddy County, NM

  17. 78 FR 67393 - Change in Discount Rate for Water Resources Planning

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-12

    ... Discount Rate for Water Resources Planning AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of change. SUMMARY: The Water Resources Planning Act of 1965 and the Water Resources Development Act of 1974 require an annual determination of a discount rate for Federal water resources planning. The discount rate...

  18. 43. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    43. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). NORTH ELEVATION (NORTH SIDE) AND WEST ELEVATION (WEST SIDE). - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  19. 42. Photographic copy of original construction drawing, dated June 1911 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    42. Photographic copy of original construction drawing, dated June 1911 (from paper-copy of aperture-card negative at Bureau of Reclamation, Pacific Northwest Regional Office, Boise, ID). EAST ELEVATION (EAST SIDE) AND SOUTH ELEVATION (SOUTH SIDE). - Boise Project, Boise Project Office, 214 Broadway, Boise, Ada County, ID

  20. 60. McMILLAN DAM Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    60. McMILLAN DAM - Photographic copy of construction drawing dated April 4, 1917 (from aperture card located at Bureau of Reclamation, Salt Lake City). DETAIL CONSTRUCTION SPILLWAY NO. 2 - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  1. 57. McMILLAN DAM Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    57. McMILLAN DAM - Photographic copy of construction drawing dated January 15, 1913 (from aperture card located at Bureau of Reclamation, Salt Lake City) POWER LIFTING MECHANISM FOR HEADGATES - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  2. 75 FR 34476 - Glen Canyon Dam Adaptive Management Work Group

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-17

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Glen Canyon Dam Adaptive Management Work Group... Management Work Group. The purpose of the Adaptive Management Work Group is to advise and to provide... of the Glen Canyon Dam Adaptive Management Work Group is in the public interest in connection with...

  3. 77 FR 66480 - Final Environmental Impact Statement, Narrows Project, Sanpete County, Utah

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-05

    ... availability. SUMMARY: We, the Bureau of Reclamation, announce the availability of the final environmental impact statement on the Narrows Project, a non- Federal dam and reservoir proposed by the Sanpete Water... Availability of Weekly Receipt of Environmental Impact Statements in the Federal Register. This notice, usually...

  4. 30 CFR 1202.100 - Royalty on oil.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Royalty on oil. 1202.100 Section 1202.100 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT, DEPARTMENT OF THE INTERIOR Natural... the lease when such off-lease use is permitted by the Bureau of Ocean Energy Management, Regulation...

  5. Environmental Glossary with Metric Conversion Tables. Revised Edition.

    ERIC Educational Resources Information Center

    Deason, Wayne O.

    This glossary of over 800 environmental terms was prepared specifically for Bureau of Reclamation personnel who write and review environmental assessments and environmental impact statements. The document is designed to ensure that the terminology of various disciplines is understood by all specialists and is used in a consistent manner. Included…

  6. 76 FR 54487 - Charter Renewal, Glen Canyon Dam Adaptive Management Work Group

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-01

    ... Management Work Group AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of renewal. SUMMARY: Following... Interior (Secretary) is renewing the charter for the Glen Canyon Dam Adaptive Management Work Group. The purpose of the Adaptive Management Work Group is to advise and to provide recommendations to the Secretary...

  7. 30 CFR 1227.10 - What is the authority for information collection?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false What is the authority for information collection? 1227.10 Section 1227.10 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... Collection Clearance Officer, Bureau of Ocean Energy Management, Regulation, and Enforcement, 381 Elden...

  8. 43 CFR 423.25 - Vandalism, tampering, and theft.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Vandalism, tampering, and theft. 423.25 Section 423.25 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION... of Conduct § 423.25 Vandalism, tampering, and theft. (a) You must not tamper or attempt to tamper...

  9. 43 CFR 417.4 - Changed conditions, emergency, or hardship modifications.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Changed conditions, emergency, or hardship modifications. 417.4 Section 417.4 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION...

  10. 43 CFR 417.4 - Changed conditions, emergency, or hardship modifications.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Changed conditions, emergency, or hardship modifications. 417.4 Section 417.4 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION...

  11. 43 CFR 417.4 - Changed conditions, emergency, or hardship modifications.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Changed conditions, emergency, or hardship modifications. 417.4 Section 417.4 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION...

  12. 43 CFR 417.4 - Changed conditions, emergency, or hardship modifications.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Changed conditions, emergency, or hardship modifications. 417.4 Section 417.4 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION...

  13. 43 CFR 417.4 - Changed conditions, emergency, or hardship modifications.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Changed conditions, emergency, or hardship modifications. 417.4 Section 417.4 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR PROCEDURAL METHODS FOR IMPLEMENTING COLORADO RIVER WATER CONSERVATION...

  14. 76 FR 16818 - Central Valley Project Improvement Act, Standard Criteria for Ag and Urban Water Management Plans

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-25

    ... Valley Project water conservation best management practices (BMPs) that shall develop Criteria for... project contractors using best available cost- effective technology and best management practices.'' The... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Central Valley Project Improvement Act, Standard...

  15. 43 CFR 426.13 - Excess land appraisals.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Excess land appraisals. 426.13 Section 426.13 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR ACREAGE LIMITATION RULES AND REGULATIONS § 426.13 Excess land appraisals. (a) When does...

  16. 76 FR 3655 - Bunker Hill Groundwater Basin, Riverside-Corona Feeder Project, San Bernardino and Riverside...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-20

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Bunker Hill Groundwater Basin, Riverside-Corona... Draft Environmental Impact Statement (SDEIR/DEIS) for the proposed Riverside-Corona Feeder (RCF) Project... Bernardino, California 92410 Corona Public Library, 650 South Main Street, Corona, California 92882 Riverside...

  17. 43 CFR 423.27 - Advertising and public solicitation.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Advertising and public solicitation. 423.27 Section 423.27 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION... of Conduct § 423.27 Advertising and public solicitation. You must not engage in advertising or...

  18. 43 CFR 423.27 - Advertising and public solicitation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Advertising and public solicitation. 423.27 Section 423.27 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION... of Conduct § 423.27 Advertising and public solicitation. You must not engage in advertising or...

  19. 43 CFR 423.27 - Advertising and public solicitation.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false Advertising and public solicitation. 423.27 Section 423.27 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION... of Conduct § 423.27 Advertising and public solicitation. You must not engage in advertising or...

  20. 43 CFR 423.27 - Advertising and public solicitation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Advertising and public solicitation. 423.27 Section 423.27 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION... of Conduct § 423.27 Advertising and public solicitation. You must not engage in advertising or...

  1. 43 CFR 423.27 - Advertising and public solicitation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Advertising and public solicitation. 423.27 Section 423.27 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION... of Conduct § 423.27 Advertising and public solicitation. You must not engage in advertising or...

  2. 76 FR 584 - Glen Canyon Dam Adaptive Management Program Work Group (AMWG)

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-05

    ... 2010 expenditures, (2) updates on High Flow Experimental Protocol and the Non-native Fish Control... Group (AMWG) AGENCY: Bureau of Reclamation, Interior. ACTION: Notice of public meeting. SUMMARY: The... committee, the Adaptive Management Work Group (AMWG), a technical work group (TWG), a Grand Canyon...

  3. 43 CFR 418.6 - Fallon Paiute-Shoshone Indian Reservation.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false Fallon Paiute-Shoshone Indian Reservation. 418.6 Section 418.6 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION... General Provisions § 418.6 Fallon Paiute-Shoshone Indian Reservation. Nothing in this part affects: (a...

  4. 43 CFR 418.6 - Fallon Paiute-Shoshone Indian Reservation.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Fallon Paiute-Shoshone Indian Reservation. 418.6 Section 418.6 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION... General Provisions § 418.6 Fallon Paiute-Shoshone Indian Reservation. Nothing in this part affects: (a...

  5. 43 CFR 418.6 - Fallon Paiute-Shoshone Indian Reservation.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Fallon Paiute-Shoshone Indian Reservation. 418.6 Section 418.6 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION... General Provisions § 418.6 Fallon Paiute-Shoshone Indian Reservation. Nothing in this part affects: (a...

  6. 43 CFR 429.10 - What application form should I use?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true What application form should I use? 429.10 Section 429.10 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION...) Commercial filming and photography; (2) Commercial guiding and outfitting; (3) Commercial or organized...

  7. 43 CFR 429.10 - What application form should I use?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false What application form should I use? 429.10 Section 429.10 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION...) Commercial filming and photography; (2) Commercial guiding and outfitting; (3) Commercial or organized...

  8. 43 CFR 429.10 - What application form should I use?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 1 2013-10-01 2013-10-01 false What application form should I use? 429.10 Section 429.10 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION...) Commercial filming and photography; (2) Commercial guiding and outfitting; (3) Commercial or organized...

  9. 43 CFR 429.10 - What application form should I use?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 1 2014-10-01 2014-10-01 false What application form should I use? 429.10 Section 429.10 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION...) Commercial filming and photography; (2) Commercial guiding and outfitting; (3) Commercial or organized...

  10. 43 CFR 429.10 - What application form should I use?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What application form should I use? 429.10 Section 429.10 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION...) Commercial filming and photography; (2) Commercial guiding and outfitting; (3) Commercial or organized...

  11. Reclamation technology development for western Arkansas coal refuse waste materials

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    King, J.R.; Veith, D.L.

    Coal mining has been an important industry in the Arkansas River Valley Major Land Resource Area (MLRA) of western Arkansas for more than 100 yr., most of it with little regard for environmental concerns. Almost 3,640 ha. of land affected by surface coal mines cover the seven-county area, with less than 1,200 ha. currently in various stages of operation or reclamation. Since only the active mining sites must now be reclaimed by law, the remaining 2,440 ha. of abandoned land remains at the mercy of natural forces. Little topsoil exists on these sites and the coal wastes are generally acidicmore » with a pH in the 4.0-5.5 range. Revegetation attempts under these conditions generally require continued maintenance and retreatment until an acceptable cover is achieved. If and when an acceptable vegetative cover is established, the cost frequently approaches $7,400/ha. ($3,000/acre). In an effort to resolve these issues and provide some direction for stabilizing coal waste lands, the US Department of Agriculture through its Soil Conservation Service Plant Materials Center at Boonville, Arkansas, received a Congressional Pass through administered by the US Bureau of Mines, to support a 5-yr. revegetation study on the coal mine spoils of western Arkansas. This paper reports the results through the spring of 1994 on that portion of the study dealing with the establishment of blackberries as a cash crop on coal mine spoils.« less

  12. Drought Risk and Adaptation in the Interior (DRAI)

    NASA Astrophysics Data System (ADS)

    McNeeley, S.; Ojima, D. S.

    2013-12-01

    Drought is part of the normal climate variability in the Great Plains and Intermountain Western United States, but recent severe droughts along with climate change projections have increased the interest and need for better understanding of drought science and decision making. The purpose of this study is to understand how the U.S. Department of the Interior's (DOI) federal land and resource managers and their stakeholders (i.e., National Park Service, Bureau of Land Management, Fish and Wildlife Service, Bureau of Reclamation, Bureau of Indian Affairs and tribes, among others) are experiencing and dealing with drought in their landscapes. The Drought Risk and Adaptation in the Interior (DRAI) project is part of a new DOI-sponsored North Central Climate Science Center (NC CSC) crosscutting science initiative on drought across the Center's three foundational science areas: 1. physical climate, 2. ecosystems impacts and responses, and 3. human adaptation and decision making. The overarching goal is to learn more about drought within the DOI public lands and resource management in order to contribute to both the NC CSC regional science as well as providing managers and other decision makers with the most salient, credible, and legitimate research to support land and resource management decisions. Here we will present the project approach along with some initial insights learned from the research to date along with its utility for climate adaptation.

  13. Areas of gain and loss along the Platte River, central Nebraska, spring 1999

    USGS Publications Warehouse

    Stanton, Jennifer S.

    2000-01-01

    In an effort to protect endangered and other wildlife species, the governors of Nebraska, Colorado, and Wyoming, and the Secretary of the U.S. Department of the Interior signed an agreement in 1997 (Platte River Endangered Species Partnership, 1997) to initiate the development of a basin-wide habitat recovery program for the central reaches of the Platte River in Nebraska.  This agreement recognizes the need to maintain minimal flows in the central reaches of the Platte River.  An understanding of the surface-water and ground-water interaction along the central reaches of the Platte River is critical to deliver water to the targeted habitat areas.  Therefore, a study by the U.S. Geological Survey (USGS), in cooperation with the Bureau of Reclamation and the U.S. Fish and Wildlife Service, was conducted to determine qualitatively the areas of gain and loss along the central Platte River between Gothenburg and Silver Creek, Nebraska (fig. 1).  The purpose of this report is to present the results of the study.

  14. Determination of total mercury in whole-body fish and fish muscle plugs collected from the South Fork of the Humboldt River, Nevada, September 2005

    USGS Publications Warehouse

    May, Thomas W.; Brumbaugh, William G.

    2007-01-01

    This report presents the results of a study by the U.S. Geological Survey, done in cooperation with the U.S. Bureau of Reclamation, to determine mercury concentrations in whole-body fish and fish muscle plugs from the South Fork of the Humboldt River near Elko in the Te-Moak Indian Reservation. A single muscle plug was collected from beneath the dorsal fin area in each of the three whole-body fish samples. After homogenization and lyophilization of the muscle plugs and whole-body fish samples, mercury concentrations were determined with a direct mercury analyzer utilizing the process of thermal combustion-gold amalgamation atomic absorption spectroscopy. Mercury concentrations in whole-body fish ranged from 0.048 to 0.061 microgram per gram wet weight, and 0.061 to 0.082 microgram per gram wet weight in muscle plugs. All sample mercury concentrations were well below the U.S. Environmental Protection Agency's fish consumption advisory of 0.30 microgram per gram wet weight.

  15. Geochemical Results of Lysimeter Sampling at the Manning Canyon Repository in the Mercur Mining District, Utah

    USGS Publications Warehouse

    Earle, John; Choate, LaDonna

    2010-01-01

    This report presents chemical characteristics of transient unsaturated-zone water collected by lysimeter from the Manning Canyon repository site in Utah. Data collected by U.S. Geological Survey and U.S. Department of the Interior, Bureau of Land Management scientists under an intragovernmental order comprise the existing body of hydrochemical information on unsaturated-zone conditions at the site and represent the first effort to characterize the chemistry of the soil pore water surrounding the repository. Analyzed samples showed elevated levels of arsenic, barium, chromium, and strontium, which are typical of acidic mine drainage. The range of major-ion concentrations generally showed expected soil values. Although subsequent sampling is necessary to determine long-term effects of the repository, current results provide initial data concerning reactive processes of precipitation on the mine tailings and waste rock stored at the site and provide information on the effectiveness of reclamation operations at the Manning Canyon repository.

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Diefenderfer, Heida L.

    This annual report is a deliverable for fiscal year 2007 (FY07) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort of the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbiamore » River and estuary. In FY07, EOS project accomplishments included (1) subgroup meetings; (2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via the project tracking system, PISCES; (4) quarterly project status reports; and (5) a major revision to the Estuary RME Plan (new version September 2007) based on comments by EOS members and invited reviewers.« less

  17. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Diefenderfer, Heida L.

    This annual report is a deliverable for fiscal year 2007 (FY07) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to responsibilities arising from the Endangered Species Act as a result of operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia Rivermore » and estuary. In FY07, EOS project accomplishments included 1) subgroup meetings; 2) participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, PISCES; 4) quarterly project status reports; and 5) a major revision to the Estuary RME Plan (new version September 2007) based on comments by EOS members and invited reviewers.« less

  18. Risk-informed Management of Water Infrastructure in the United States: History, Development, and Best Practices

    NASA Astrophysics Data System (ADS)

    Wolfhope, J.

    2017-12-01

    This presentation will focus on the history, development, and best practices for evaluating the risks associated with the portfolio of water infrastructure in the United States. These practices have evolved from the early development of the Federal Guidelines for Dam Safety and the establishment of the National Dam Safety Program, to the most recent update of the Best Practices for Dam and Levee Risk Analysis jointly published by the U.S. Department of Interior Bureau of Reclamation and the U.S. Army Corps of Engineers. Since President Obama signed the Water Infrastructure Improvements for the Nation Act (WIIN) Act, on December 16, 2016, adding a new grant program under FEMA's National Dam Safety Program, the focus has been on establishing a risk-based priority system for use in identifying eligible high hazard potential dams for which grants may be made. Finally, the presentation provides thoughts on the future direction and priorities for managing the risk of dams and levees in the United States.

  19. Lower Columbia River and Estuary Ecosystem Restoration Program Reference Site Study: 2011 Restoration Analysis - FINAL REPORT

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Borde, Amy B.; Cullinan, Valerie I.; Diefenderfer, Heida L.

    The Reference Site (RS) study is part of the research, monitoring, and evaluation (RME) effort developed by the Action Agencies (Bonneville Power Administration [BPA], U.S. Army Corps of Engineers, Portland District [USACE], and U.S. Bureau of Reclamation) in response to Federal Columbia River Power System (FCRPS) Biological Opinions (BiOp). While the RS study was initiated in 2007, data have been collected at relatively undisturbed reference wetland sites in the LCRE by PNNL and collaborators since 2005. These data on habitat structural metrics were previously summarized to provide baseline characterization of 51 wetlands throughout the estuarine and tidal freshwater portions ofmore » the 235-km LCRE; however, further analysis of these data has been limited. Therefore, in 2011, we conducted additional analyses of existing field data previously collected for the Columbia Estuary Ecosystem Restoration Program (CEERP) - including data collected by PNNL and others - to help inform the multi-agency restoration planning and ecosystem management work underway in the LCRE.« less

  20. 75 FR 22423 - Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-28

    ...: Reopening of comment period for review of the Pick-Sloan Missouri Basin Program, Eastern and Western... reopening the comment period for the Pick-Sloan Missouri Basin Program, Eastern and Western Division... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Pick-Sloan Missouri Basin Program, Eastern and...

  1. 30 CFR 1207.4 - Contracts made pursuant to old form leases.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false Contracts made pursuant to old form leases. 1207.4 Section 1207.4 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... Secretary of the Interior, or by the Director of the Bureau of Ocean Energy Management, Regulation, and...

  2. To authorize early repayment of obligations to the Bureau of Reclamation within the Northport Irrigation District in the State of Nebraska.

    THOMAS, 113th Congress

    Rep. Smith, Adrian [R-NE-3

    2014-05-01

    Senate - 07/23/2014 Received in the Senate and Read twice and referred to the Committee on Energy and Natural Resources. (All Actions) Tracker: This bill has the status Passed HouseHere are the steps for Status of Legislation:

  3. USBR Type III and Type IV stilling basin and rock apron associated with stepped chutes

    USDA-ARS?s Scientific Manuscript database

    Stilling basins are commonly used as energy dissipators for structural chutes. Classical research conducted by scientists of the U. S. Bureau of Reclamation (USBR) led to the development of design criteria for a variety of stilling basin configurations as the outlet works for smooth chutes, but lit...

  4. 5 CFR Appendix A to Part 582 - List of Agents Designated To Accept Legal Process

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Center, Office of General Counsel, Attention: Code L, P.O. Box 998002, Cleveland, OH 44199-8002, (216... Agency (DCAA) and the Defense Logistics Agency (DLA) who are employed outside the United States: See..., Bureau of Reclamation. Administrative Service Center, Department of the Interior, P.O. Box 272030, 7201...

  5. 5 CFR Appendix A to Part 582 - List of Agents Designated To Accept Legal Process

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... Center, Office of General Counsel, Attention: Code L, P.O. Box 998002, Cleveland, OH 44199-8002, (216... Agency (DCAA) and the Defense Logistics Agency (DLA) who are employed outside the United States: See..., Bureau of Reclamation. Administrative Service Center, Department of the Interior, P.O. Box 272030, 7201...

  6. 5 CFR Appendix A to Part 582 - List of Agents Designated To Accept Legal Process

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Center, Office of General Counsel, Attention: Code L, P.O. Box 998002, Cleveland, OH 44199-8002, (216... Agency (DCAA) and the Defense Logistics Agency (DLA) who are employed outside the United States: See..., Bureau of Reclamation. Administrative Service Center, Department of the Interior, P.O. Box 272030, 7201...

  7. 5 CFR Appendix A to Part 582 - List of Agents Designated To Accept Legal Process

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Center, Office of General Counsel, Attention: Code L, P.O. Box 998002, Cleveland, OH 44199-8002, (216... Agency (DCAA) and the Defense Logistics Agency (DLA) who are employed outside the United States: See..., Bureau of Reclamation. Administrative Service Center, Department of the Interior, P.O. Box 272030, 7201...

  8. 5 CFR Appendix A to Part 582 - List of Agents Designated To Accept Legal Process

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Center, Office of General Counsel, Attention: Code L, P.O. Box 998002, Cleveland, OH 44199-8002, (216... Agency (DCAA) and the Defense Logistics Agency (DLA) who are employed outside the United States: See..., Bureau of Reclamation. Administrative Service Center, Department of the Interior, P.O. Box 272030, 7201...

  9. 63. McMILLAN DAM Photographic copy of construction drawing dated ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    63. McMILLAN DAM - Photographic copy of construction drawing dated July 19, 1937 (from aperture card located at Bureau of Reclamation, Salt Lake City). McMILLAN DAM - GENERAL PLAN AND SECTIONS WITH PROPOSED IMPROVEMENTS - Carlsbad Irrigation District, McMillan Dam, On Pecos River, 13 miles North of Carlsbad, Carlsbad, Eddy County, NM

  10. 43 CFR 420.21 - Procedure for designating areas for off-road vehicle use.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... cultural or historic resources of particular areas or trails of the public lands, he shall immediately... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Procedure for designating areas for off... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR OFF-ROAD VEHICLE USE Designated Areas and Permitted...

  11. 25 CFR 216.8 - Performance bond.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 25 Indians 1 2011-04-01 2011-04-01 false Performance bond. 216.8 Section 216.8 Indians BUREAU OF... RECLAMATION OF LANDS General Provisions § 216.8 Performance bond. (a) Upon approval of an exploration plan or mining plan, the operator shall be required to file a suitable performance bond of not less than $2,000...

  12. 25 CFR 216.8 - Performance bond.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Performance bond. 216.8 Section 216.8 Indians BUREAU OF... RECLAMATION OF LANDS General Provisions § 216.8 Performance bond. (a) Upon approval of an exploration plan or mining plan, the operator shall be required to file a suitable performance bond of not less than $2,000...

  13. 25 CFR 216.8 - Performance bond.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 25 Indians 1 2012-04-01 2011-04-01 true Performance bond. 216.8 Section 216.8 Indians BUREAU OF... RECLAMATION OF LANDS General Provisions § 216.8 Performance bond. (a) Upon approval of an exploration plan or mining plan, the operator shall be required to file a suitable performance bond of not less than $2,000...

  14. 25 CFR 216.8 - Performance bond.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 25 Indians 1 2014-04-01 2014-04-01 false Performance bond. 216.8 Section 216.8 Indians BUREAU OF... RECLAMATION OF LANDS General Provisions § 216.8 Performance bond. (a) Upon approval of an exploration plan or mining plan, the operator shall be required to file a suitable performance bond of not less than $2,000...

  15. 25 CFR 216.8 - Performance bond.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 25 Indians 1 2013-04-01 2013-04-01 false Performance bond. 216.8 Section 216.8 Indians BUREAU OF... RECLAMATION OF LANDS General Provisions § 216.8 Performance bond. (a) Upon approval of an exploration plan or mining plan, the operator shall be required to file a suitable performance bond of not less than $2,000...

  16. 76 FR 46840 - Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Time Extension To Accept Proposals, Select One Lessee, and Contract for Hydroelectric Power Development at the Pueblo Dam River Outlet, a Feature of the... period for accepting written proposals detailed in the Notice of Intent to Accept Proposals, Select One...

  17. 75 FR 1408 - Pick-Sloan Missouri Basin Program, Eastern and Western Division Proposed Project Use Power Rate

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-11

    ... of Proposed Pick-Sloan Missouri Basin Program, Eastern and Western Divisions, Project Use Power Rate...) for Project Use Power for the Pick-Sloan Missouri Basin Program (P-SMBP), Eastern and Western... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Pick-Sloan Missouri Basin Program, Eastern and...

  18. 76 FR 39436 - Draft Environmental Impact Statement/Environmental Impact Report (EIS/EIR) and Notice of Scoping...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-06

    ... other CVP contractors, to Reclamation's Refuge Water Supply Program (RWSP) for delivery to the San... livestock and/or municipal and industrial uses because of water supply shortages or when full contract... Contractors Water Authority's 25-Year Water Transfer Program 2014 to 2038, California AGENCY: Bureau of...

  19. 75 FR 8395 - Bunker Hill Groundwater Basin, Riverside-Corona Feeder Project, San Bernardino and Riverside...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Bunker Hill Groundwater Basin, Riverside-Corona...) will prepare a joint EIS/EIR for the proposed Riverside-Corona Feeder Project. The public and agencies... participate in the planning, design, and construction of the Riverside-Corona Feeder Project including: (i) 20...

  20. 77 FR 9264 - Agency Information Collection; Renewal of a Currently Approved Information Collection

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ... collection for the Lower Colorado River Well Inventory (1006-0014). The current OMB approval expires on May... announces that the Bureau of Reclamation is requesting approval for the collection of data from well and...: Lower Colorado River Well Inventory. OMB Control Number: 1006-0014. Abstract: Pursuant to the Boulder...

  1. 33 CFR 208.28 - Foss Dam and Reservoir, Washita River, Oklahoma.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Foss Dam and Reservoir, Washita... THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.28 Foss Dam and Reservoir, Washita River, Oklahoma. The Bureau of Reclamation shall operate the Foss Dam and Reservoir in the interest of...

  2. 75 FR 13301 - Los Vaqueros Reservoir Expansion, Contra Costa and Alameda Counties, CA

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-19

    ... DEPARTMENT OF THE INTERIOR Bureau of Reclamation Los Vaqueros Reservoir Expansion, Contra Costa... Reservoir Expansion Final EIS/EIR. Los Vaqueros Expansion is a proposed action in the August 2000 CALFED Bay... Vaqueros Reservoir from its existing capacity of 100 thousand acre-feet (TAF). A 175 TAF expansion option...

  3. 33 CFR 208.28 - Foss Dam and Reservoir, Washita River, Oklahoma.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Foss Dam and Reservoir, Washita... THE ARMY, DEPARTMENT OF DEFENSE FLOOD CONTROL REGULATIONS § 208.28 Foss Dam and Reservoir, Washita River, Oklahoma. The Bureau of Reclamation shall operate the Foss Dam and Reservoir in the interest of...

  4. National Water Model assessment for water management needs over the Western United States.

    NASA Astrophysics Data System (ADS)

    Viterbo, F.; Thorstensen, A.; Cifelli, R.; Hughes, M.; Johnson, L.; Gochis, D.; Wood, A.; Nowak, K.; Dahm, K.

    2017-12-01

    The NOAA National Water Model (NWM) became operational in August 2016, providing the first ever, real-time distributed high-resolution forecasts for the continental United States. Since the model predictions occur at the CONUS scale, there is a need to evaluate the NWM in different regions to assess the wide variety and heterogeneity of hydrological processes that are included (e.g., snow melting, ice freezing, flash flooding events). In particular, to address water management needs in the western U.S., a collaborative project between the Bureau of Reclamation, NOAA, and NCAR is ongoing to assess the NWM performance for reservoir inflow forecasting needs and water management operations. In this work, the NWM is evaluated using different forecast ranges (short to medium) and retrospective historical runs forced by North American Land Data Assimilation System (NLDAS) analysis to assess the NWM skills over key headwaters watersheds in the western U.S. that are of interest to the Bureau of Reclamation. The streamflow results are analyzed and compared with the available observations at the gauge sites, evaluating different NWM operational versions together with the already existing local River Forecast Center forecasts. The NWM uncertainty is also considered, evaluating the propagation of the precipitation forcing uncertainties in the resulting hydrograph. In addition, the possible advantages of high-resolution distributed output variables (such as soil moisture, evapotranspiration fluxes) are investigated, to determine the utility of such information for water managers in terms of watershed characteristics in areas that traditionally have not had any forecast information. The results highlight the NWM's ability to provide high-resolution forecast information in space and time. As anticipated, the performance is best in regions that are dominated by natural flows and where the model has benefited from efforts toward parameter calibration. In highly regulated basins, the water management operations result in NWM overestimation of the peak flows and too fast recession curves. As a future project goal, some reforecasts will be run on target locations, ingesting water management information into the NWM and comparing the new results with the actual operational forecast.

  5. Using a High-Resolution Ensemble Modeling Method to Inform Risk-Based Decision-Making at Taylor Park Dam, Colorado

    NASA Astrophysics Data System (ADS)

    Mueller, M.; Mahoney, K. M.; Holman, K. D.

    2015-12-01

    The Bureau of Reclamation (Reclamation) is responsible for the safety of Taylor Park Dam, located in central Colorado at an elevation of 9300 feet. A key aspect of dam safety is anticipating extreme precipitation, runoff and the associated inflow of water to the reservoir within a probabilistic framework for risk analyses. The Cooperative Institute for Research in Environmental Sciences (CIRES) has partnered with Reclamation to improve understanding and estimation of precipitation in the western United States, including the Taylor Park watershed. A significant challenge is that Taylor Park Dam is located in a relatively data-sparse region, surrounded by mountains exceeding 12,000 feet. To better estimate heavy precipitation events in this basin, a high-resolution modeling approach is used. The Weather Research and Forecasting (WRF) model is employed to simulate events that have produced observed peaks in streamflow at the location of interest. Importantly, an ensemble of model simulations are run on each event so that uncertainty bounds (i.e., forecast error) may be provided such that the model outputs may be more effectively used in Reclamation's risk assessment framework. Model estimates of precipitation (and the uncertainty thereof) are then used in rainfall runoff models to determine the probability of inflows to the reservoir for use in Reclamation's dam safety risk analyses.

  6. 30 CFR 1210.20 - What if I disagree with the burden hour estimates?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 3 2011-07-01 2011-07-01 false What if I disagree with the burden hour estimates? 1210.20 Section 1210.20 Mineral Resources OFFICE OF SURFACE MINING RECLAMATION AND ENFORCEMENT... estimates or suggestions on reducing the burden to the Bureau of Ocean Energy Management, Regulation, and...

  7. 78 FR 76995 - Endangered and Threatened Wildlife and Plants; Threatened Status for Eriogonum codium (Umtanum...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-20

    ... bladderpod. The Bureau of Reclamation has installed a system of surface and buried drains designed to... characterize genetic diversity and compare tuplashensis and douglasii under the study design. We find the peer... irrigated private lands or manmade structures (such as buildings, pavement, or other structures) and the...

  8. 5 CFR 532.285 - Special wage schedules for supervisors of negotiated rate Bureau of Reclamation employees.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... industry titles 211 Oil and gas extraction. 212 Mining (except oil and gas). 213 Support activities for..., Bend, Medford, Umatilla, Multnomah Utah: Salt Lake Idaho: Ada, Canyon, Adams Washington: Spokane, Grant..., Platte, Niobrara, Converse, Natrona, Fremont, Sublette, Lincoln Utah: Beaver, Box Elder, Cache, Carbon...

  9. 5 CFR 532.285 - Special wage schedules for supervisors of negotiated rate Bureau of Reclamation employees.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... industry titles 211 Oil and gas extraction. 212 Mining (except oil and gas). 213 Support activities for..., Bend, Medford, Umatilla, Multnomah Utah: Salt Lake Idaho: Ada, Canyon, Adams Washington: Spokane, Grant..., Platte, Niobrara, Converse, Natrona, Fremont, Sublette, Lincoln Utah: Beaver, Box Elder, Cache, Carbon...

  10. 5 CFR 532.285 - Special wage schedules for supervisors of negotiated rate Bureau of Reclamation employees.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... industry titles 211 Oil and gas extraction. 212 Mining (except oil and gas). 213 Support activities for..., Bend, Medford, Umatilla, Multnomah Utah: Salt Lake Idaho: Ada, Canyon, Adams Washington: Spokane, Grant..., Platte, Niobrara, Converse, Natrona, Fremont, Sublette, Lincoln Utah: Beaver, Box Elder, Cache, Carbon...

  11. 5 CFR 532.285 - Special wage schedules for supervisors of negotiated rate Bureau of Reclamation employees.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... industry titles 211 Oil and gas extraction. 212 Mining (except oil and gas). 213 Support activities for..., Bend, Medford, Umatilla, Multnomah Utah: Salt Lake Idaho: Ada, Canyon, Adams Washington: Spokane, Grant..., Platte, Niobrara, Converse, Natrona, Fremont, Sublette, Lincoln Utah: Beaver, Box Elder, Cache, Carbon...

  12. 5 CFR 532.285 - Special wage schedules for supervisors of negotiated rate Bureau of Reclamation employees.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... industry titles 211 Oil and gas extraction. 212 Mining (except oil and gas). 213 Support activities for..., Bend, Medford, Umatilla, Multnomah Utah: Salt Lake Idaho: Ada, Canyon, Adams Washington: Spokane, Grant..., Platte, Niobrara, Converse, Natrona, Fremont, Sublette, Lincoln Utah: Beaver, Box Elder, Cache, Carbon...

  13. 43 CFR 423.63 - Existing special use areas.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... OF THE INTERIOR PUBLIC CONDUCT ON BUREAU OF RECLAMATION FACILITIES, LANDS, AND WATERBODIES Special Use Areas § 423.63 Existing special use areas. Areas where rules were in effect on April 17, 2006 that... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Existing special use areas. 423.63 Section...

  14. 43 CFR 2524.3 - Time extended to make final proof.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Time extended to make final proof. 2524.3 Section 2524.3 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... Entries Within a Reclamation Project § 2524.3 Time extended to make final proof. When the time for...

  15. 43 CFR 2524.3 - Time extended to make final proof.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Time extended to make final proof. 2524.3 Section 2524.3 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... Entries Within a Reclamation Project § 2524.3 Time extended to make final proof. When the time for...

  16. 43 CFR 2524.3 - Time extended to make final proof.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Time extended to make final proof. 2524.3 Section 2524.3 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... Entries Within a Reclamation Project § 2524.3 Time extended to make final proof. When the time for...

  17. 43 CFR 2524.3 - Time extended to make final proof.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Time extended to make final proof. 2524.3 Section 2524.3 Public Lands: Interior Regulations Relating to Public Lands (Continued) BUREAU OF LAND... Entries Within a Reclamation Project § 2524.3 Time extended to make final proof. When the time for...

  18. 43 CFR 404.18 - How can I request assistance to conduct a feasibility study?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... feasibility study? 404.18 Section 404.18 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF... request assistance to conduct a feasibility study? To request assistance to conduct a feasibility study under § 404.11(a) or (b), consistent with Reclamation's recommendation in an appraisal report, you must...

  19. 33 CFR 208.26 - Altus Dam and Reservoir, North Fork Red River, Okla.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... elevation forecast indicates that this operation will result in a reservoir level exceeding elevation 1562... and reservoir from major damage. (j) Any time that the Bureau of Reclamation determines that operation... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Altus Dam and Reservoir, North...

  20. 33 CFR 208.26 - Altus Dam and Reservoir, North Fork Red River, Okla.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... elevation forecast indicates that this operation will result in a reservoir level exceeding elevation 1562... and reservoir from major damage. (j) Any time that the Bureau of Reclamation determines that operation... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Altus Dam and Reservoir, North...

  1. "U.S. Reclamation Service, Grand River Dam, details of piers 'C' ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    "U.S. Reclamation Service, Grand River Dam, details of piers 'C' & 'E,' Oct. 10, 1914." - Grand Valley Diversion Dam, Half a mile north of intersection of I-70 & Colorado State Route 65, Cameo, Mesa County, CO

  2. An Archive of Downscaled WCRP CMIP3 Climate Projections for Planning Applications in the Contiguous United States

    NASA Astrophysics Data System (ADS)

    Brekke, L. D.; Pruitt, T.; Maurer, E. P.; Duffy, P. B.

    2007-12-01

    Incorporating climate change information into long-term evaluations of water and energy resources requires analysts to have access to climate projection data that have been spatially downscaled to "basin-relevant" resolution. This is necessary in order to develop system-specific hydrology and demand scenarios consistent with projected climate scenarios. Analysts currently have access to "climate model" resolution data (e.g., at LLNL PCMDI), but not spatially downscaled translations of these datasets. Motivated by a common interest in supporting regional and local assessments, the U.S. Bureau of Reclamation and LLNL (through support from the DOE National Energy Technology Laboratory) have teamed to develop an archive of downscaled climate projections (temperature and precipitation) with geographic coverage consistent with the North American Land Data Assimilation System domain, encompassing the contiguous United States. A web-based information service, hosted at LLNL Green Data Oasis, has been developed to provide Reclamation, LLNL, and other interested analysts free access to archive content. A contemporary statistical method was used to bias-correct and spatially disaggregate projection datasets, and was applied to 112 projections included in the WCRP CMIP3 multi-model dataset hosted by LLNL PCMDI (i.e. 16 GCMs and their multiple simulations of SRES A2, A1b, and B1 emissions pathways).

  3. A sampling plan for riparian birds of the Lower Colorado River-Final Report

    USGS Publications Warehouse

    Bart, Jonathan; Dunn, Leah; Leist, Amy

    2010-01-01

    A sampling plan was designed for the Bureau of Reclamation for selected riparian birds occurring along the Colorado River from Lake Mead to the southerly International Boundary with Mexico. The goals of the sampling plan were to estimate long-term trends in abundance and investigate habitat relationships especially in new habitat being created by the Bureau of Reclamation. The initial objective was to design a plan for the Gila Woodpecker (Melanerpes uropygialis), Arizona Bell's Vireo (Vireo bellii arizonae), Sonoran Yellow Warbler (Dendroica petechia sonorana), Summer Tanager (Piranga rubra), Gilded Flicker (Colaptes chrysoides), and Vermilion Flycatcher (Pyrocephalus rubinus); however, too little data were obtained for the last two species. Recommendations were therefore based on results for the first four species. The study area was partitioned into plots of 7 to 23 hectares. Plot borders were drawn to place the best habitat for the focal species in the smallest number of plots so that survey efforts could be concentrated on these habitats. Double sampling was used in the survey. In this design, a large sample of plots is surveyed a single time, yielding estimates of unknown accuracy, and a subsample is surveyed intensively to obtain accurate estimates. The subsample is used to estimate detection ratios, which are then applied to the results from the extensive survey to obtain unbiased estimates of density and population size. These estimates are then used to estimate long-term trends in abundance. Four sampling plans for selecting plots were evaluated based on a simulation using data from the Breeding Bird Survey. The design with the highest power involved selecting new plots every year. Power with 80 plots surveyed per year was more than 80 percent for three of the four species. Results from the surveys were used to provide recommendations to the Bureau of Reclamation for their surveys of new habitat being created in the study area.

  4. Denver Radium Site -- Operable Unit X closeout report for the US Environmental Protection Agency

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-03-01

    The Denver Radium Site consists of properties in the Denver area having radioactive contamination left from radium processing in the early 1900s. The properties are divided into 11 groups or operable units'' to facilitate remedial action management of the Site. Under the provisions of the Superfund Amendments and Reauthorization Act (SARA) of 1986, the US Environmental Protection Agency (EPA) is authorized to respond to a release of a hazardous substance or to a substantial threat of such a release into the environment. EPA or the state conducts a site inspection and uses the Hazard Ranking System to determine placement onmore » the EPA National Priorities List (NPL). In 1983, EPA placed the Denver Radium Site on the NPL, making it eligible for cleanup under the EPA Superfund Program. Through a series of interagency agreements,EPA has enlisted the support of the US Department of Energy Grand junction Projects Office and Chem-Nuclear Geotech, Inc., for remedial design and remedial action activities at the Denver Radium Superfund Site.The US Bureau of Reclamation (USBR) is managing the waste transportation and disposal contract.« less

  5. Denver Radium Site -- Operable Unit X closeout report for the US Environmental Protection Agency

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-03-01

    The Denver Radium Site consists of properties in the Denver area having radioactive contamination left from radium processing in the early 1900s. The properties are divided into 11 groups or ``operable units`` to facilitate remedial action management of the Site. Under the provisions of the Superfund Amendments and Reauthorization Act (SARA) of 1986, the US Environmental Protection Agency (EPA) is authorized to respond to a release of a hazardous substance or to a substantial threat of such a release into the environment. EPA or the state conducts a site inspection and uses the Hazard Ranking System to determine placement onmore » the EPA National Priorities List (NPL). In 1983, EPA placed the Denver Radium Site on the NPL, making it eligible for cleanup under the EPA Superfund Program. Through a series of interagency agreements,EPA has enlisted the support of the US Department of Energy Grand junction Projects Office and Chem-Nuclear Geotech, Inc., for remedial design and remedial action activities at the Denver Radium Superfund Site.The US Bureau of Reclamation (USBR) is managing the waste transportation and disposal contract.« less

  6. Estimating Western U.S. Reservoir Sedimentation

    NASA Astrophysics Data System (ADS)

    Bensching, L.; Livneh, B.; Greimann, B. P.

    2017-12-01

    Reservoir sedimentation is a long-term problem for water management across the Western U.S. Observations of sedimentation are limited to reservoir surveys that are costly and infrequent, with many reservoirs having only two or fewer surveys. This work aims to apply a recently developed ensemble of sediment algorithms to estimate reservoir sedimentation over several western U.S. reservoirs. The sediment algorithms include empirical, conceptual, stochastic, and processes based approaches and are coupled with a hydrologic modeling framework. Preliminary results showed that the more complex and processed based algorithms performed better in predicting high sediment flux values and in a basin transferability experiment. However, more testing and validation is required to confirm sediment model skill. This work is carried out in partnership with the Bureau of Reclamation with the goal of evaluating the viability of reservoir sediment yield prediction across the western U.S. using a multi-algorithm approach. Simulations of streamflow and sediment fluxes are validated against observed discharges, as well as a Reservoir Sedimentation Information database that is being developed by the US Army Corps of Engineers. Specific goals of this research include (i) quantifying whether inter-algorithm differences consistently capture observational variability; (ii) identifying whether certain categories of models consistently produce the best results, (iii) assessing the expected sedimentation life-span of several western U.S. reservoirs through long-term simulations.

  7. Studies of satellite support to weather modification in the western US region

    NASA Technical Reports Server (NTRS)

    Cotton, W. R.; Grant, L. O.; Vonderhaar, T. H.

    1978-01-01

    The applications of meteorological satellite data to both summer and winter weather modification programs are addressed. Appraisals of the capability of satellites to assess seedability, to provide real-time operational support, and to assist in the post-experiment analysis of a seeding experiment led to the incorporation of satellite observing systems as a major component in the Bureau of Reclamations weather modification activities. Satellite observations are an integral part of the South Park Area cumulus experiment (SPACE) which aims to formulate a quantitative hypothesis for enhancing precipitation from orographically induced summertime mesoscale convective systems (orogenic mesoscale systems). Progress is reported in using satellite observations to assist in classifying the important mesoscale systems, and in defining their frequency and coverage, and potential area of effect. Satellite studies of severe storms are also covered.

  8. Historical physical and chemical data for water in Lake Powell and from Glen Canyon Dam releases, Utah-Arizona, 1964–2012

    USGS Publications Warehouse

    Vernieu, William S.

    2013-01-01

    This report presents the physical and chemical characteristics of water in Lake Powell and from Glen Canyon Dam releases from 1964 through 2012. These data are available in a several electronic formats. Data have been collected throughout this period by various offices of the Bureau of Reclamation and U.S. Geological Survey and are compiled to represent the existing body of chemical and physical information on Lake Powell and Glen Canyon Dam releases. From this record, further interpretation may be made concerning mixing processes in Lake Powell, the movement and fate of advective inflow currents, effects of climate and hydrological variations, and the effects of the operation and structure of Glen Canyon Dam on the quality of water in Lake Powell and from Glen Canyon Dam releases.

  9. Installation of a groundwater monitoring-well network on the east side of the Uncompahgre River in the Lower Gunnison River Basin, Colorado, 2012

    USGS Publications Warehouse

    Thomas, Judith C.; Arnold, Larry R. Rick

    2015-07-06

    The east side of the Uncompahgre River Basin has been a known contributor of dissolved selenium to recipient streams. Discharge of groundwater containing dissolved selenium contributes to surface-water selenium concentrations and loads; however, the groundwater system on the east side of the Uncompahgre River Basin is not well characterized. The U.S. Geological Survey, in cooperation with the Colorado Water Conservation Board and the Bureau of Reclamation, has established a groundwater-monitoring network on the east side of the Uncompahgre River Basin. Ten monitoring wells were installed during October and November 2012. This report presents location data, lithologic logs, well-construction diagrams, and well-development information. Understanding the groundwater system will provide managers with an additional metric for evaluating the effectiveness of salinity and selenium control projects.

  10. Preliminary flood-duration frequency estimates using naturalized streamflow records for the Willamette River Basin, Oregon

    USGS Publications Warehouse

    Lind, Greg D.; Stonewall, Adam J.

    2018-02-13

    In this study, “naturalized” daily streamflow records, created by the U.S. Army Corps of Engineers and the Bureau of Reclamation, were used to compute 1-, 3-, 7-, 10-, 15-, 30-, and 60-day annual maximum streamflow durations, which are running averages of daily streamflow for the number of days in each duration. Once the annual maximum durations were computed, the floodduration frequencies could be estimated. The estimated flood-duration frequencies correspond to the 50-, 20-, 10-, 4-, 2-, 1-, 0.5-, and 0.2-percent probabilities of their occurring or being exceeded each year. For this report, the focus was on the Willamette River Basin in Oregon, which is a subbasin of the Columbia River Basin. This study is part of a larger one encompassing the entire Columbia Basin.

  11. USGS Workshop on Scientific Aspects of a Long-Term Experimental Plan for Glen Canyon Dam, April 10-11, 2007, Flagstaff, Arizona

    USGS Publications Warehouse

    ,

    2008-01-01

    Executive Summary Glen Canyon Dam is located in the lower reaches of Glen Canyon National Recreation Area on the Colorado River, approximately 15 miles upriver from Grand Canyon National Park (fig. 1). In 1992, Congress passed and the President signed into law the Grand Canyon Protection Act (GCPA; title XVIII, sec. 1801?1809, of Public Law 102-575), which seeks ?to protect, mitigate adverse impacts to, and improve the values for which Grand Canyon National Park and Glen Canyon National Recreation Area were established.? The Glen Canyon Dam Adaptive Management Program (GCDAMP) was implemented as a result of the 1996 Record of Decision on the Operation of Glen Canyon Dam Final Environmental Impact Statement to ensure that the primary mandate of the GCPA is met through advances in information and resources management (U.S. Department of the Interior, 1995). On November 3, 2006, the Bureau of Reclamation (Reclamation) announced it would develop a long-term experimental plan environmental impact statement (LTEP EIS) for operational activities at Glen Canyon Dam and other management actions on the Colorado River. The purpose of the long-term experimental plan is twofold: (1) to increase the scientific understanding of the ecosystem and (2) to improve and protect important downstream resources. The proposed plan would implement a structured, longterm program of experimentation to include dam operations, potential modifications to Glen Canyon Dam intake structures, and other management actions such as removal of nonnative fish species. The development of the long-term experimental plan continues efforts begun by the GCDAMP to protect resources downstream of Glen Canyon Dam, including Grand Canyon, through adaptive management and scientific experimentation. The LTEP EIS will rely on the extensive scientific studies that have been undertaken as part of the adaptive management program by the U.S. Geological Survey?s (USGS) Grand Canyon Monitoring and Research Center (GCMRC), one of the four research stations within the USGS Southwest Biological Science Center. On April 10 and 11, 2007, at the behest of Reclamation, the GCMRC convened a workshop with scientific experts to identify one or more scientifically credible, long-term experimental options for Reclamation to consider for the LTEP EIS that would be consistent with the purpose and need for the plan. Workshop participants included government, academic, and private scientists with broad experience in the Colorado River in Grand Canyon and regulated rivers around the world. Resource managers and GCDAMP participants were also present on the second day of the workshop. In advance of the workshop, Reclamation and LTEP EIS cooperating agencies identified 14 core scientific questions. Workshop participants were asked to consider how proposed options would address these questions, which fall primarily into four areas: (1) conservation of endangered humpback chub (Gila cypha) and other high-priority biological resources, (2) conservation of sediment resources, (3) enhancement of recreational resources, and (4) preservation of cultural resources. A secondary objective of the workshop was the evaluation of four long-term experimental options developed by the GCDAMP Science Planning Group (SPG) (appendix B). The flow and nonflow treatments called for in the four experimental options were an important starting point for workshop discussions. At the beginning of the workshop, participants were provided with the final LTEP EIS scoping report prepared by Reclamation. Participants were also advised that Reclamation had committed to ?make every effortEto ensure that a new population of humpback chub is established in the mainstem or one or more of the tributaries within Grand Canyon? in the 1995 Operation of Glen Canyon Dam Final Environmental Impact Statement (U.S. Department of the Interior, 1995). This decision was consistent with the U.S. Fish and Wildlife Service?s 1995 bi

  12. 43 CFR 10005.10 - Relationship of the plan to the authorities and responsibilities of other agencies.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ..., through management of the land and water upon which fish and wildlife depend, or, in the case of Federal... responsibility for operation and maintenance of mitigation and conservation features and to refrain from... Project Office, the Bureau of Reclamation, the Central Utah Water Conservancy District, the Fish and...

  13. 43 CFR 10005.10 - Relationship of the plan to the authorities and responsibilities of other agencies.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ..., through management of the land and water upon which fish and wildlife depend, or, in the case of Federal... responsibility for operation and maintenance of mitigation and conservation features and to refrain from... Project Office, the Bureau of Reclamation, the Central Utah Water Conservancy District, the Fish and...

  14. 43 CFR 10005.10 - Relationship of the plan to the authorities and responsibilities of other agencies.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ..., through management of the land and water upon which fish and wildlife depend, or, in the case of Federal... responsibility for operation and maintenance of mitigation and conservation features and to refrain from... Project Office, the Bureau of Reclamation, the Central Utah Water Conservancy District, the Fish and...

  15. 33 CFR 208.29 - Arbuckle Dam and Lake of the Arbuckles, Rock Creek, Okla.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Arbuckles, Rock Creek, Okla. 208.29 Section 208.29 Navigation and Navigable Waters CORPS OF ENGINEERS... Arbuckles, Rock Creek, Okla. The Bureau of Reclamation, or its designated agent, shall operate the Arbuckle... in excess of bankfull on Rock Creek downstream of the lake and on the Washita River, from the...

  16. 33 CFR 208.29 - Arbuckle Dam and Lake of the Arbuckles, Rock Creek, Okla.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Arbuckles, Rock Creek, Okla. 208.29 Section 208.29 Navigation and Navigable Waters CORPS OF ENGINEERS... Arbuckles, Rock Creek, Okla. The Bureau of Reclamation, or its designated agent, shall operate the Arbuckle... in excess of bankfull on Rock Creek downstream of the lake and on the Washita River, from the...

  17. 33 CFR 208.29 - Arbuckle Dam and Lake of the Arbuckles, Rock Creek, Okla.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Arbuckles, Rock Creek, Okla. 208.29 Section 208.29 Navigation and Navigable Waters CORPS OF ENGINEERS... Arbuckles, Rock Creek, Okla. The Bureau of Reclamation, or its designated agent, shall operate the Arbuckle... in excess of bankfull on Rock Creek downstream of the lake and on the Washita River, from the...

  18. 33 CFR 208.29 - Arbuckle Dam and Lake of the Arbuckles, Rock Creek, Okla.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Arbuckles, Rock Creek, Okla. 208.29 Section 208.29 Navigation and Navigable Waters CORPS OF ENGINEERS... Arbuckles, Rock Creek, Okla. The Bureau of Reclamation, or its designated agent, shall operate the Arbuckle... in excess of bankfull on Rock Creek downstream of the lake and on the Washita River, from the...

  19. 33 CFR 208.29 - Arbuckle Dam and Lake of the Arbuckles, Rock Creek, Okla.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Arbuckles, Rock Creek, Okla. 208.29 Section 208.29 Navigation and Navigable Waters CORPS OF ENGINEERS... Arbuckles, Rock Creek, Okla. The Bureau of Reclamation, or its designated agent, shall operate the Arbuckle... in excess of bankfull on Rock Creek downstream of the lake and on the Washita River, from the...

  20. 76 FR 64104 - Notice To Solicit Comments and Hold Public Scoping Meetings on the Adoption of a Long-term...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-17

    ... Long-term Experimental and Management Plan (LTEMP) for the operation of Glen Canyon Dam. This Federal... and Hold Public Scoping Meetings on the Adoption of a Long-term Experimental and Management Plan for the Operation of Glen Canyon Dam AGENCY: Bureau of Reclamation and National Park Service, Interior...

  1. 43 CFR 2524.5 - Assignment of desert-land entries in whole or in part.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 2 2012-10-01 2012-10-01 false Assignment of desert-land entries in whole... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.5 Assignment of desert-land entries in...

  2. 43 CFR 2524.5 - Assignment of desert-land entries in whole or in part.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 43 Public Lands: Interior 2 2013-10-01 2013-10-01 false Assignment of desert-land entries in whole... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.5 Assignment of desert-land entries in...

  3. 43 CFR 2524.5 - Assignment of desert-land entries in whole or in part.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 2 2011-10-01 2011-10-01 false Assignment of desert-land entries in whole... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.5 Assignment of desert-land entries in...

  4. 43 CFR 2524.5 - Assignment of desert-land entries in whole or in part.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 43 Public Lands: Interior 2 2014-10-01 2014-10-01 false Assignment of desert-land entries in whole... (Continued) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.5 Assignment of desert-land entries in...

  5. 43 CFR Appendix A to Part 418 - Calculation of Efficiency Equation

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false Calculation of Efficiency Equation A Appendix A to Part 418 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION.... 418, App. A Appendix A to Part 418—Calculation of Efficiency Equation ER18DE97.008 ER18DE97.009 ...

  6. 43 CFR Appendix A to Part 418 - Calculation of Efficiency Equation

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Calculation of Efficiency Equation A Appendix A to Part 418 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION.... 418, App. A Appendix A to Part 418—Calculation of Efficiency Equation ER18DE97.008 ER18DE97.009 ...

  7. 76 FR 22724 - Draft Program Environmental Impact Statement/Environmental Impact Report (PEIS/R) and Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... (Restoration Goal); and (2) to reduce or avoid adverse water supply impacts to all of the Friant Division long... populations of salmon and other fish. Water Management Goal--To reduce or avoid adverse water supply impacts... Bureau of Reclamation and the California Department of Water Resources (DWR) have prepared a joint Draft...

  8. 43 CFR 2524.4 - Beginning of period for compliance with the law.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.4 Beginning of period for compliance with the law... Government and a water supply has been made available for the land embraced in such desert-land entry, the...

  9. 43 CFR 2524.4 - Beginning of period for compliance with the law.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.4 Beginning of period for compliance with the law... Government and a water supply has been made available for the land embraced in such desert-land entry, the...

  10. 43 CFR 2524.4 - Beginning of period for compliance with the law.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.4 Beginning of period for compliance with the law... Government and a water supply has been made available for the land embraced in such desert-land entry, the...

  11. 43 CFR 2524.4 - Beginning of period for compliance with the law.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ...) BUREAU OF LAND MANAGEMENT, DEPARTMENT OF THE INTERIOR LAND RESOURCE MANAGEMENT (2000) DESERT-LAND ENTRIES Desert-Land Entries Within a Reclamation Project § 2524.4 Beginning of period for compliance with the law... Government and a water supply has been made available for the land embraced in such desert-land entry, the...

  12. 76 FR 39435 - Notice of Intent To Prepare a Draft Environmental Impact Statement and Conduct Public Scoping on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-06

    ... Experimental and Management Plan for the Operation of Glen Canyon Dam AGENCY: Bureau of Reclamation and... Interior (Secretary) Ken Salazar announced that the development of a Long-Term Experimental and Management... GCDAMP includes a Federal advisory committee known as the Glen Canyon Dam Adaptive Management Work Group...

  13. Extraction and utilization of saltcedar and Russian olive biomass

    Treesearch

    Dennis P. Dykstra

    2010-01-01

    This chapter assesses technologies that might be useful for utilization of saltcedar and Russian olive trees as biomass. These are invasive species that are being targeted for eradication by the Bureau of Reclamation under federal legislation passed in 2007. One option is to utilize the biomass from stems and branches, and possibly even from roots and foliage,...

  14. 43 CFR 428.4 - Who must submit forms under this part.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Who must submit forms under this part. 428.4 Section 428.4 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION... THE ELIGIBILITY OF CERTAIN FORMERLY EXCESS LAND § 428.4 Who must submit forms under this part. (a) You...

  15. 33 CFR 208.22 - Twin Buttes Dam and Reservoir, Middle and South Concho Rivers, Tex.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... the reservoir level; number of river outlet works gates in operation with their respective openings... 33 Navigation and Navigable Waters 3 2011-07-01 2011-07-01 false Twin Buttes Dam and Reservoir... and Reservoir, Middle and South Concho Rivers, Tex. The Bureau of Reclamation, or its designated agent...

  16. 33 CFR 208.22 - Twin Buttes Dam and Reservoir, Middle and South Concho Rivers, Tex.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... the reservoir level; number of river outlet works gates in operation with their respective openings... 33 Navigation and Navigable Waters 3 2010-07-01 2010-07-01 false Twin Buttes Dam and Reservoir... and Reservoir, Middle and South Concho Rivers, Tex. The Bureau of Reclamation, or its designated agent...

  17. Bureau of Reclamation Small Conduit Hydropower Development and Rural Jobs Act

    THOMAS, 113th Congress

    Sen. Barrasso, John [R-WY

    2013-02-13

    Senate - 06/03/2013 By Senator Wyden from Committee on Energy and Natural Resources filed written report. Report No. 113-35. (All Actions) Notes: For further action, see H.R.678, which became Public Law 113-24 on 8/9/2013. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  18. 43 CFR 24.4 - Resource management and public activities on Federal lands.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... National Park System. (b) The Bureau of Reclamation withdraws public lands and acquires non-Federal lands... encourage non-Federal public bodies to administer project land and water areas for recreation and fish and... Act of 1976 (43 U.S.C. 1701 et seq.) directed that non-wilderness BLM lands be managed by the...

  19. 43 CFR 24.4 - Resource management and public activities on Federal lands.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... National Park System. (b) The Bureau of Reclamation withdraws public lands and acquires non-Federal lands... encourage non-Federal public bodies to administer project land and water areas for recreation and fish and... Act of 1976 (43 U.S.C. 1701 et seq.) directed that non-wilderness BLM lands be managed by the...

  20. 43 CFR 24.4 - Resource management and public activities on Federal lands.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... National Park System. (b) The Bureau of Reclamation withdraws public lands and acquires non-Federal lands... encourage non-Federal public bodies to administer project land and water areas for recreation and fish and... Act of 1976 (43 U.S.C. 1701 et seq.) directed that non-wilderness BLM lands be managed by the...

  1. 43 CFR 24.4 - Resource management and public activities on Federal lands.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... National Park System. (b) The Bureau of Reclamation withdraws public lands and acquires non-Federal lands... encourage non-Federal public bodies to administer project land and water areas for recreation and fish and... Act of 1976 (43 U.S.C. 1701 et seq.) directed that non-wilderness BLM lands be managed by the...

  2. 43 CFR 24.4 - Resource management and public activities on Federal lands.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... National Park System. (b) The Bureau of Reclamation withdraws public lands and acquires non-Federal lands... encourage non-Federal public bodies to administer project land and water areas for recreation and fish and... Act of 1976 (43 U.S.C. 1701 et seq.) directed that non-wilderness BLM lands be managed by the...

  3. 78 FR 23953 - Draft Environmental Impact Statement/Environmental Impact Report for Yolo Bypass Salmonid Habitat...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-23

    ...The Bureau of Reclamation is reopening the comment period for the scoping process. The public comment period will now end on May 6, 2013. We published the notice of intent in the Federal Register on March 4, 2013 (78 FR 14117). The public comment period originally ended on April 3, 2013.

  4. 43 CFR 423.16 - Who can be exempted from closures?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false Who can be exempted from closures? 423.16 Section 423.16 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION... Open and Closed to Public Use § 423.16 Who can be exempted from closures? (a) You may be exempted from...

  5. Government and technological innovation - Weather modification as a case in point.

    NASA Technical Reports Server (NTRS)

    Lambright, W. H.

    1972-01-01

    The principal technology on which all forms of intentional, local weather modification ultimately rest is that of cloud seeding. There are three primary milestones in the evolution of such a new technology including invention, development, and introduction to society on an operational basis. It is shown that government has been deeply involved in each of the first two phases of weather modification's evolution. The agencies involved include the military agencies, the Weather Bureau, the National Science Foundation, and the Bureau of Reclamation. It is pointed out that weather modification will require some unusually flexible and open administrative devices if it is to advance in the public interest.

  6. 76 FR 82320 - Extension of Public Scoping Period for the Draft Environmental Impact Statement for Adoption of a...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-30

    ... Management Plan for the Operation of Glen Canyon Dam AGENCY: Bureau of Reclamation and National Park Service... Impact Statement (EIS) for Adoption of a Long-term Experimental and Management Plan (LTEMP) for the Operation of Glen Canyon Dam to January 31, 2012. The Notice to Solicit Comments and Hold Public Scoping...

  7. 75 FR 35085 - Notice of Realty Action: Recreation and Public Purposes Act Classification, Elko County, NV

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    ... Management (BLM) by the City of Elko (City). The City proposes to use the land for a waste water reclamation... may submit comments involving the suitability of the land for a waste water treatment facility... DEPARTMENT OF THE INTERIOR Bureau of Land Management [LLNVE00000 L14300000.ES0000 241A; N-85701...

  8. Environmental Hazard of Selenium in the Animas La Plata Wate Development Project

    Treesearch

    A. Dennis Lemly

    1997-01-01

    A hazard assessment of selenium was conducted for the Animas La Plata Project, a multiple-use water development proposed for Colorado and New Mexico by the United States Bureau of Reclamation. A published protocol for aquatic hazard assessment of selenium was applied to environmental monitoring data to assess current threats to biota in the water supply rivers (Animas...

  9. 43 CFR 428.7 - What happens if a farm operator does not submit required forms.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 43 Public Lands: Interior 1 2011-10-01 2011-10-01 false What happens if a farm operator does not... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR INFORMATION REQUIREMENTS FOR CERTAIN FARM OPERATIONS IN EXCESS OF 960 ACRES AND THE ELIGIBILITY OF CERTAIN FORMERLY EXCESS LAND § 428.7 What happens if a farm...

  10. 43 CFR 428.7 - What happens if a farm operator does not submit required forms.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 43 Public Lands: Interior 1 2010-10-01 2010-10-01 false What happens if a farm operator does not... BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR INFORMATION REQUIREMENTS FOR CERTAIN FARM OPERATIONS IN EXCESS OF 960 ACRES AND THE ELIGIBILITY OF CERTAIN FORMERLY EXCESS LAND § 428.7 What happens if a farm...

  11. Bureau of Reclamation Fish Recovery Programs Reauthorization Act of 2011

    THOMAS, 112th Congress

    Sen. Bingaman, Jeff [D-NM

    2011-06-16

    Senate - 06/23/2011 Committee on Energy and Natural Resources Subcommittee on Water and Power. Hearings held. With printed Hearing: S.Hrg. 112-129. (All Actions) Notes: For further action, see H.R.6060, which became Public Law 112-270 on 1/14/2013. Tracker: This bill has the status IntroducedHere are the steps for Status of Legislation:

  12. 76 FR 51024 - Percheron Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ... a 100- foot-wide, 15-foot-high intake grate and a 50-foot-wide, 15-foot-high trash rack; (2) an... flows provided by the Bureau of Reclamation and the South Columbia Basin Irrigation District. The..., notices of intent, and competing applications may be filed electronically via the Internet. See 18 CFR 385...

  13. 76 FR 51025 - Percheron Power, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-17

    ...-foot-wide, 15-foot-high trash rack; (2) an approximately 100-foot-long, 20-foot-wide powerhouse..., and would operate as run-of-release using irrigation flows provided by the Bureau of Reclamation and... be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the...

  14. River bar vegetation mowing response in the Middle Rio Grande

    Treesearch

    Esteban Muldavin; Elizabeth Milford; Yvonne Chauvin

    1999-01-01

    The Bureau of Reclamation routinely mows vegetation on side bars along the Rio Grande to assist with river flow management. To address the question of how such mowing affects vegetation composition and structure, three bars in the middle Rio Grande near Albuquerque, New Mexico were selected in 1994 for an experimental mowing program. Three 50-foot-wide strips on each...

  15. Minot, North Dakota: Oroville-Tonasket, Washington; and San Luis Valley project, Colorado - water resource legislation. Hearing before the Subcommittee on Water and Power of the Committee on Energy and Natural Resources, United States Senate, One Hundredth Congress, First Session on S. 641, S. 649, and S. 1549, August 5, 1987

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1987-01-01

    The first bill, S. 641, would provide for the relief of the city of Minot, North Dakota. S. 641 was introduced by Senator Burdick and is cosponsored by the vice chairman of this subcommittee, Senator Conrad. The second bill would amend the Reclamation Authorization Act of 1976 to increase the authorization ceiling on the Oroville-Tonasket project in Washington State. S. 649 was introduced by Senator Evans, the ranking member of the subcommittee and is cosponsored by Senator Adams. The third measure, S. 1549, would increase the authorization ceiling for the Closed Basin Division of the San Luis Valley project inmore » Colorado, and was introduced by Senator Wirth, also a member of the subcommittee, and is cosponsored by Senator Armstrong. Copies of each bill are first included, followed by statements by: US Senators and Congressmen from the cognizant states; C. Dale Dwall, Commissioner, Bureau of Reclamation, Department of the Interior; George Christensen, major, Minot, North Dakota; Edward Kuhn, president Minot City Council; Richard B. Price, counsel Oroville-Tonasket Irrigation District; and Leland Robinson, board president, Oroville-Tonasket Irrigation District.« less

  16. An analysis of reservoir storage contents for the proposed enlargement of Bumping Lake in Washington

    USGS Publications Warehouse

    Bartells, John H.

    1981-01-01

    Monthend contents of the proposed Bumping Lake enlargement in Washington were determined for the period 1917-73 by using the historic streamflow record as a basis for inflow to the reservoir and imposing certain operational requirements on reservoir releases. The operational requirements used were those set forth in the Environmental Statement that was prepared for the project by the U.S. Water and Power Resources Service (formerly the U.S. Bureau of Reclamation). The computations show that after starting with an empty reservoir on October 1, 1917, the 458,000 acre-feet capacity of the enlarged lake could be nearly full (384,000 acre-feet) on November 30, 1925, which is the starting scenario given in the Environmental Statement. From 1925 to 1973 the computations compare favorably with those shown in the Environmental Statement, with minor differences due to releases of fish enhancement water. In all cases studied, all fishwater requirements and all existing irrigation requirements were met, and generally from 30,000 to 90,000 acre-feet of extra irrigation water could be available in most years. (USGS)

  17. An inventory of published and unpublished fluvial-sediment data for California, 1956-70

    USGS Publications Warehouse

    Porterfield, George

    1972-01-01

    This inventory was prepared to provide a convenient reference to published and unpublished fluvial-sediment data for water years 1956-70, and updates substantially previous inventories. Sediment stations are listed in downstream order, and an alphabetical list of stations is also included. Figure 1 shows the approximate location of sediment stations in California. Most of the fluvial-sediment data in California were collected by the U.S. Geological Survey, under cooperative agreements with the following Federal, State, and local agencies: California Department of Water Resources, California Department of Navigation and Ocean Development, California Department of Fish and Game, Bolinas Harbor District, Monterey County Flood Control and Water Conservation District, Orange County Flood Control District, Riverside County Flood Control and Water Conservation District, San Diego County Department of Sanitation and Flood Control, San Luis Obispo County, San Mateo County, Santa Clara County Flood Control and Water District, Santa Cruz County Flood Control and Water Conservation District, Santa Cruz, city of, University of California, Ventura County Flood Control District, Forest Service, U.S. Department of Agriculture, Soil Conservation Service, U.S. Department of Agriculture, Corps of Engineers, U.S. Army, Bureau of Reclamation, U.S. Department of the Interior, National Park Service, U.S. Department of the Interior. This report was prepared by the Geological Survey under the general supervision of R. Stanley Lord, district chief in charge of water-resources investigations in California.

  18. Development of Site Characterization Simulator Specifications

    DTIC Science & Technology

    1996-11-01

    Jeff Farrar, Geotechnical Engineer with Earth Sciences Laboratory, Bureau of Reclamation; Jason Smolensky, Hydrogeologist at SRK-Canada, and Doctors Ed...Heyse and Mark Goltz , Department of Engineering and Environmental Management, Air Force Institute of Technology). Considering these discussions, the...Windows 3.1 or higher, 35mb, hard disk. Delta Research Corporation, Niceville FL. 139 Roberts, P.V., Goltz , M.N., and Mackay, D.M. 1986. A Natural

  19. Assessment of dissolved-solids loading to the Colorado River in the Paradox Basin between the Dolores River and Gypsum Canyon, Utah

    USGS Publications Warehouse

    Shope, Christopher L.; Gerner, Steven J.

    2014-01-01

    Salinity loads throughout the Colorado River Basin have been a concern over recent decades due to adverse impacts on population, natural resources, and regional economics. With substantial financial resources and various reclamation projects, the salt loading to Lake Powell and associated total dissolved-solids concentrations in the Lower Colorado River Basin have been substantially reduced. The Colorado River between its confluence with the Dolores River and Lake Powell traverses a physiographic area where saline sedimentary formations and evaporite deposits are prevalent. However, the dissolved-solids loading in this area is poorly understood due to the paucity of water-quality data. From 2003 to 2011, the U.S. Geological Survey in cooperation with the U.S. Bureau of Reclamation conducted four synoptic sampling events to quantify the salinity loading throughout the study reach and evaluate the occurrence and impacts of both natural and anthropogenic sources. The results from this study indicate that under late-summer base-flow conditions, dissolved-solids loading in the reach is negligible with the exception of the Green River, and that variations in calculated loads between synoptic sampling events are within measurement and analytical uncertainties. The Green River contributed approximately 22 percent of the Colorado River dissolved-solids load, based on samples collected at the lower end of the study reach. These conclusions are supported by water-quality analyses for chloride and bromide, and the results of analyses for the stable isotopes of oxygen and deuterium. Overall, no significant sources of dissolved-solids loading from tributaries or directly by groundwater discharge, with the exception of the Green River, were identified in the study area.

  20. Annotated bibliography for the humpback chub (Gila cypha) with emphasis on the Grand Canyon population.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Goulet, C. T.; LaGory, K. E.; Environmental Science Division

    2009-10-05

    Glen Canyon Dam is a hydroelectric facility located on the Colorado River in Arizona that is operated by the U.S. Bureau of Reclamation (Reclamation) for multiple purposes including water storage, flood control, power generation, recreation, and enhancement of fish and wildlife. Glen Canyon Dam operations have been managed for the last several years to improve conditions for the humpback chub (Gila cypha) and other ecosystem components. An extensive amount of literature has been produced on the humpback chub. We developed this annotated bibliography to assist managers and researchers in the Grand Canyon as they perform assessments, refine management strategies, andmore » develop new studies to examine the factors affecting humpback chub. The U.S. Geological Survey recently created a multispecies bibliography (including references on the humpback chub) entitled Bibliography of Native Colorado River Big Fishes (available at www.fort.usgs.gov/Products/data/COFishBib). That bibliography, while quite extensive and broader in scope than ours, is not annotated, and, therefore, does not provide any of the information in the original literature. In developing this annotated bibliography, we have attempted to assemble abstracts from relevant published literature. We present here abstracts taken unmodified from individual reports and articles except where noted. The bibliography spans references from 1976 to 2009 and is organized in five broad topical areas, including: (1) biology, (2) ecology, (3) impacts of dam operations, (4) other impacts, and (5) conservation and management, and includes twenty subcategories. Within each subcategory, we present abstracts alphabetically by author and chronologically by year. We present relevant articles not specific to either the humpback chub or Glen Canyon Dam, but cited in other included reports, under the Supporting Articles subcategory. We provide all citations in alphabetical order in Section 7.« less

  1. Medicine Bow wind project

    NASA Astrophysics Data System (ADS)

    Nelson, L. L.

    1982-05-01

    The Bureau of Reclamation (Bureau) conducted studies for a wind turbine field of 100 MW at a site near Medicine Bow, WY, one of the windiest areas in the United States. The wind turbine system would be electrically interconnected to the existing Federal power grid through the substation at Medicine Bow. Power output from the wind turbines would thus be integrated with the existing hydroelectric system, which serves as the energy storage system. An analysis based on 'willingness to pay' was developed. Based on information from the Department of Energy's Western Area Power Administration (Western), it was assumed that 90 mills per kWh would represent the 'willingness to pay' for onpeak power, and 45 mills per kWh for offpeak power. The report concludes that a 100-MW wind field at Medicine Bow has economic and financial feasibility. The Bureau's construction of the Medicine Bow wind field could demonstrate to the industry the feasibility of wind energy.

  2. WTS-4 system verification unit for wind/hydroelectric integration study

    NASA Technical Reports Server (NTRS)

    Watts, A. W.

    1982-01-01

    The Bureau of Reclamation (Reclamation) initiated a study to investigate the concept of integrating 100 MW of wind energy from megawatt-size wind turbines with the Federal hydroelectric system. As a part of the study, one large wind turbine was purchased through the competitive bid process and is now being installed to serve as a system verification unit (SVU). Reclamation negotiated an agreement with NASA to provide technical management of the project for the design, fabrication, installation, testing, and initial operation. Hamilton Standard was awarded a contract to furnish and install its WTS-4 wind turbine rated at 4 MW at a site near Medicine Bow, Wyoming. The purposes for installing the SVU are to fully evaluate the wind/hydro integration concept, make technical evaluation of the hardware design, train personnel in the technology, evaluate operation and maintenance aspects, and evaluate associated environmental impacts. The SVU will be operational in June 1982. Data from the WTS-4 and from a second SVU, Boeing's MOD-2, will be used to prepare a final design for a 100-MW farm if Congress authorizes the project.

  3. Records of wells, ground-water levels, and ground-water withdrawals in the lower Goose Creek Basin, Cassia County, Idaho

    USGS Publications Warehouse

    Mower, R.W.

    1954-01-01

    Investigations by the United States Geological Survey of Ground Water in the Southern border area of the Snake Rive Plain, south of the Snake River, a re concerned at the present time with delineation of the principal ground-water districts, the extent and location of existing ground-water developments, the possibilities for additional development, and the effects of ground-water development on the regimen of streams and reservoirs whose waters are appropriate for beneficial use. The lower part of the Goose Creek Basin is one of the important ground-water districts of the southern plains area and there are substantial but spotty developments of ground water for irrigation in the basin. Several thousand irrigable acres that are now dry could be put under irrigation if a dependable supply of ground water could be developed. The relations of the ground-water reservoirs to the regime of the Snake River and Goose Cree, and to the large body of ground water in the Snake River Plain north of the Snake, are poorly known. A large amount of geologic and hydrologic study remains to be done before those relations can be accurately determined. Investigations will be continued in the future but file work and preparation of a comprehensive report inevitably will be delayed. Therefore the available records are presented herein in order to make them accessible to farmers, well drillers, government agencies, and the general public. Interpretation of the records is not attempted in this report and is deferred pending the accumulation of additional and quantitative information. The data summarized herein include records of the locations and physical characteristics of wells, the depth to water in wells, fluctuations of water levels in observation wells, and estimated rates and volumes of seasonal ans yearly ground-water pumpage for irrigation, municipal, and other uses. This information is complete for work done as of December 31, 1952. The investigations upon which this report is based were undertaken in cooperation with the U.S. Bureau of Reclamation, Region I, at the request of the Planning Division, Central Snake River District. The report was complied in the first instance for the use of the Bureau of Reclamation but is now released to the public. The observation-well program in the area has been maintained in cooperation with the Idaho State Department of Reclamation as part of the regular cooperative program of the Geological Survey.

  4. Multiscale Assessment of Listed and At-Risk Species’ Climate Change Vulnerabilities

    DTIC Science & Technology

    2017-07-15

    Anthropogenically altered landscapes (e.g., urban or agricultural areas) that may hinder the dispersal of a species. B3. Land Use Changes from Climate Change...vulnerable (HV) and ex- tremely vulnerable (EV). Federal land management agencies include: Agricultural Research Service (ARS), Bu- reau of Land...agencies include: Agricultural Research Service (ARS), Bu- reau of Land Management (BLM), Bureau of Reclamation (BOR), Department of Defense (DoD

  5. 43 CFR 404.54 - Who will hold title to a rural water project that is constructed following the completion of an...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true Who will hold title to a rural water project that is constructed following the completion of an appraisal investigation or feasibility study under this program? 404.54 Section 404.54 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF THE INTERIOR...

  6. Changes in Federal Water Project Repayment Policies Can Reduce Federal Costs.

    DTIC Science & Technology

    1981-08-07

    a reimburs - able purpose, the users should share in cost recovery. RECOMMENDATIONS To provide for equitable cost reimbursement on underutilized...Department of the Interior’s Bureau of Reclamation that do not ensure fair and timely recovery of water projects’ reimbursable costs. We made this...such costs for reimbursable project purposes and considering them in future water price determinations, agencies often reas- signed them to

  7. 43 CFR 404.56 - If a financial assistance agreement is entered into for a rural water supply project that...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 43 Public Lands: Interior 1 2012-10-01 2011-10-01 true If a financial assistance agreement is entered into for a rural water supply project that benefits more than one Indian tribe, is the approval of each Indian tribe required? 404.56 Section 404.56 Public Lands: Interior Regulations Relating to Public Lands BUREAU OF RECLAMATION, DEPARTMENT OF...

  8. DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    The Staunton 1 Reclamation Demonstration Project involves an evaluation of the reclamation process for a deep coal mine refuse system. A typical abandoned midwestern deep coal mine refuse site was selected, final land use was determined, baseline data were collected, engineering plans were developed and implemented, and a post-construction evaluation was begun. The project is a cooperative effort by two state agencies--the Abandoned Mined Land Reclamation Council of Illinois the Illinois Institute for Environmental Quality--and the U.S. Department of Energy through the Land Reclamation Program at Argonne National Laboratory. Current investigations are monitoring groundwater, surface water quality, aquatic ecosystems, revegetation,more » soil characteristics, erosion and runoff, soil microbial and soil fauna populations, wildlife, and economic effects of the reclamation effort. The research is a multidisciplinary approach to the concept of ecosystem response to reclamation.« less

  9. NASA Data for Water Resources Applications

    NASA Technical Reports Server (NTRS)

    Toll, David; Houser, Paul; Arsenault, Kristi; Entin, Jared

    2004-01-01

    Water Management Applications is one of twelve elements in the Earth Science Enterprise National Applications Program. NASA Goddard Space Flight Center is supporting the Applications Program through partnering with other organizations to use NASA project results, such as from satellite instruments and Earth system models to enhance the organizations critical needs. The focus thus far has been: 1) estimating water storage including snowpack and soil moisture, 2) modeling and predicting water fluxes such as evapotranspiration (ET), precipitation and river runoff, and 3) remote sensing of water quality, including both point source (e.g., turbidity and productivity) and non-point source (e.g., land cover conversion such as forest to agriculture yielding higher nutrient runoff). The objectives of the partnering cover three steps of: 1) Evaluation, 2) Verification and Validation, and 3) Benchmark Report. We are working with the U.S. federal agencies including the Environmental Protection Agency (EPA), the Bureau of Reclamation (USBR) and the Department of Agriculture (USDA). We are using several of their Decision Support Systems (DSS) tools. This includes the DSS support tools BASINS used by EPA, Riverware and AWARDS ET ToolBox by USBR and SWAT by USDA and EPA. Regional application sites using NASA data across the US. are currently being eliminated for the DSS tools. The current NASA data emphasized thus far are from the Land Data Assimilation Systems WAS) and MODIS satellite products. We are currently in the first two steps of evaluation and verification validation. Water Management Applications is one of twelve elements in the Earth Science Enterprise s National Applications Program. NASA Goddard Space Flight Center is supporting the Applications Program through partnering with other organizations to use NASA project results, such as from satellite instruments and Earth system models to enhance the organizations critical needs. The focus thus far has been: 1) estimating water storage including snowpack and soil moisture, 2) modeling and predicting water fluxes such as evapotranspiration (ET), precipitation and river runoff, and 3) remote sensing of water quality, including both point source (e.g., turbidity and productivity) and non-point source (e.g., land cover conversion such as forest to agriculture yielding higher nutrient runoff). The objectives of the partnering cover three steps of 1) Evaluation, 2) Verification and Validation, and 3) Benchmark Report. We are working with the U.S. federal agencies the Environmental Protection Agency (EPA), the Bureau of Reclamation (USBR) and the Department of Agriculture (USDA). We are using several of their Decision Support Systems (DSS) tools. T us includes the DSS support tools BASINS used by EPA, Riverware and AWARDS ET ToolBox by USBR and SWAT by USDA and EPA. Regional application sites using NASA data across the US. are currently being evaluated for the DSS tools. The current NASA data emphasized thus far are from the Land Data Assimilation Systems (LDAS) and MODIS satellite products. We are currently in the first two steps of evaluation and verification and validation.

  10. Overview of Reclamation's geothermal program in Imperial Valley, California

    NASA Technical Reports Server (NTRS)

    Fulcher, M. K.

    1974-01-01

    The Bureau of Reclamation is presently involved in a unique Geothermal Resource Development Program in Imperial Valley, California. The main purpose of the investigations is to determine the feasibility of providing a source of fresh water through desalting geothermal fluids stored in the aquifers underlying the valley. Significant progress in this research and development stage to date includes extensive geophysical investigations and the drilling of five geothermal wells on the Mesa anomaly. Four of the wells are for production and monitoring the anomaly, and one will be used for reinjection of waste brines from the desalting units. Two desalting units, a multistage flash unit and a vertical tube evaporator unit, have been erected at the East Mesa test site. The units have been operated on shakedown and continuous runs and have produced substantial quantities of high-quality water.

  11. Improving medium-range ensemble streamflow forecasts through statistical post-processing

    NASA Astrophysics Data System (ADS)

    Mendoza, Pablo; Wood, Andy; Clark, Elizabeth; Nijssen, Bart; Clark, Martyn; Ramos, Maria-Helena; Nowak, Kenneth; Arnold, Jeffrey

    2017-04-01

    Probabilistic hydrologic forecasts are a powerful source of information for decision-making in water resources operations. A common approach is the hydrologic model-based generation of streamflow forecast ensembles, which can be implemented to account for different sources of uncertainties - e.g., from initial hydrologic conditions (IHCs), weather forecasts, and hydrologic model structure and parameters. In practice, hydrologic ensemble forecasts typically have biases and spread errors stemming from errors in the aforementioned elements, resulting in a degradation of probabilistic properties. In this work, we compare several statistical post-processing techniques applied to medium-range ensemble streamflow forecasts obtained with the System for Hydromet Applications, Research and Prediction (SHARP). SHARP is a fully automated prediction system for the assessment and demonstration of short-term to seasonal streamflow forecasting applications, developed by the National Center for Atmospheric Research, University of Washington, U.S. Army Corps of Engineers, and U.S. Bureau of Reclamation. The suite of post-processing techniques includes linear blending, quantile mapping, extended logistic regression, quantile regression, ensemble analogs, and the generalized linear model post-processor (GLMPP). We assess and compare these techniques using multi-year hindcasts in several river basins in the western US. This presentation discusses preliminary findings about the effectiveness of the techniques for improving probabilistic skill, reliability, discrimination, sharpness and resolution.

  12. Mainstreaming Climate Change: Recent and Ongoing Efforts to Understand, Improve, and Expand Consideration of Climate Change in Federal Water Resources Planning

    NASA Astrophysics Data System (ADS)

    Ferguson, I. M.; McGuire, M.; Broman, D.; Gangopadhyay, S.

    2017-12-01

    The Bureau of Reclamation is a Federal agency tasked with developing and managing water supply and hydropower projects in the Western U.S. Climate and hydrologic variability and change significantly impact management actions and outcomes across Reclamation's programs and initiatives, including water resource planning and operations, infrastructure design and maintenance, hydropower generation, and ecosystem restoration, among others. Planning, design, and implementation of these programs therefore requires consideration of future climate and hydrologic conditions will impact program objectives. Over the past decade, Reclamation and other Federal agencies have adopted new guidelines, directives, and mandates that require consideration of climate change in water resources planning and decision making. Meanwhile, the scientific community has developed a large number of climate projections, along with an array of models, methods, and tools to facilitate consideration of climate projections in planning and decision making. However, water resources engineers, planners, and decision makers continue to face challenges regarding how best to use the available data and tools to support major decisions, including decisions regarding infrastructure investments and long-term operating criteria. This presentation will discuss recent and ongoing research towards understanding, improving, and expanding consideration of climate projections and related uncertainties in Federal water resources planning and decision making. These research efforts address a variety of challenges, including: How to choose between available climate projection datasets and related methods, models, and tools—many of which are considered experimental or research tools? How to select an appropriate decision framework when design or operating alternatives may differ between climate scenarios? How to effectively communicate results of a climate impacts analysis to decision makers? And, how to improve robustness and resilience of water resources systems in the face of significant uncertainty? Discussion will focus on the intersection between technical challenges and decision making paradigms and the need for improved scientist-decision maker engagement through the lens of this Federal water management agency.

  13. A brief history of the U.S. Geological Survey

    USGS Publications Warehouse

    ,; Rabbitt, Mary C.

    1975-01-01

    Established by an Act of Congress in 1879 and charged with responsibility for "classification of the public lands, and examination of the geological structure, mineral resources, and products of the national domain," the U. S. Department of the Interior's Geological Survey has been the Nation's principal source of information about its physical resources the configuration and character of the land surface, the composition and structure of the underlying rocks, and the quality, extent, and distribution of water and mineral resources. Although primarily a research and fact-finding agency, it has responsibility also for the classification of Federal mineral lands and waterpower sites, and since 1926 it has been responsible for the supervision of oil and mining operations authorized under leases on Federal land. From the outset, the Survey has been concerned with critical land and resource problems. Often referred to as the Mother of Bureaus, many of its activities led to the formation of new organizations where a management or developmental function evolved. These included the Reclamation Service (1902), the Bureau of Mines (1910), the Federal Power Commission (1920), and the Grazing Service (1934, since combined with other functions as the Bureau of Land Management). Mrs. Rabbitt's summary of the Survey's history in the following pages brings out well the development of these diverse activities and the Survey's past contributions to national needs related to land and resources.

  14. Hydrologic data for the Walker River Basin, Nevada and California, water years 2010–14

    USGS Publications Warehouse

    Pavelko, Michael T.; Orozco, Erin L.

    2015-12-10

    Walker Lake is a threatened and federally protected desert terminal lake in western Nevada. To help protect the desert terminal lake and the surrounding watershed, the Bureau of Reclamation and U.S. Geological Survey have been studying the hydrology of the Walker River Basin in Nevada and California since 2004. Hydrologic data collected for this study during water years 2010 through 2014 included groundwater levels, surface-water discharge, water chemistry, and meteorological data. Groundwater levels were measured in wells, and surface-water discharge was measured in streams, canals, and ditches. Water samples for chemical analyses were collected from wells, streams, springs, and Walker Lake. Chemical analyses included determining physical properties; the concentrations of major ions, nutrients, trace metals, dissolved gases, and radionuclides; and ratios of the stable isotopes of hydrogen and oxygen. Walker Lake water properties and meteorological parameters were monitored from a floating platform on the lake. Data collection methods followed established U.S. Geological Survey guidelines, and all data are stored in the National Water Information System database. All of the data are presented in this report and accessible on the internet, except multiple-depth Walker Lake water-chemistry data, which are available only in this report.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hurlbut, D. J.; Haase, S.; Turchi, C. S.

    In January 2012, the National Renewable Energy Laboratory delivered to the Department of the Interior the first part of a study on Navajo Generating Station (Navajo GS) and the likely impacts of BART compliance options. That document establishes a comprehensive baseline for the analysis of clean energy alternatives, and their ability to achieve benefits similar to those that Navajo GS currently provides. This analysis is a supplement to NREL's January 2012 study. It provides a high level examination of several clean energy alternatives, based on the previous analysis. Each has particular characteristics affecting its relevance as an alternative to Navajomore » GS. It is assumed that the development of any alternative resource (or portfolio of resources) to replace all or a portion of Navajo GS would occur at the end of a staged transition plan designed to reduce economic disruption. We assume that replacing the federal government's 24.3% share of Navajo GS would be a cooperative responsibility of both the U.S. Bureau of Reclamation (USBR) and the Central Arizona Water Conservation District (CAWCD).« less

  16. Earthquake alarm; operating the seismograph station at the University of California, Berkeley.

    USGS Publications Warehouse

    Stump, B.

    1980-01-01

    At the University of California seismographic stations, the task of locating and determining magnitudes for both local and distant earthquakes is a continuous one. Teleseisms must be located rapidly so that events that occur in the Pacific can be identified and the Pacific Tsunami Warning System alerted. For great earthquakes anywhere, there is a responsibility to notify public agencies such as the California Office of Emergency Services, the Federal Disaster Assistance Administration, the Earthquake Engineering Research Institute, the California Seismic Safety Commission, and the American Red Cross. In the case of damaging local earthquakes, it is necessary to alert also the California Department of Water Resources, California Division of Mines and Geology, U.S Army Corps of Engineers, Federal Bureau of Reclamation, and the Bay Area Rapid Transit. These days, any earthquakes that are felt in northern California cause immediate inquiries from the news media and an interested public. The series of earthquakes that jolted the Livermore area from January 24 to 26 1980, is a good case in point. 

  17. Installation of a groundwater monitoring-well network on the east side of the Uncompahgre River in the Lower Gunnison River Basin, Colorado, 2014

    USGS Publications Warehouse

    Thomas, Judith C.

    2015-10-07

    The east side of the Uncompahgre River Basin has been a known contributor of dissolved selenium to recipient streams. Discharge of groundwater containing dissolved selenium contributes to surface-water selenium concentrations and loads; however, the groundwater system on the east side of the Uncompahgre River Basin is not well characterized. The U.S. Geological Survey, in cooperation with the Colorado Water Conservation Board and the Bureau of Reclamation, has established a groundwater-monitoring network on the east side of the Uncompahgre River Basin. Thirty wells total were installed for this project: 10 in 2012 (DS 923, http://dx.doi.org/10.3133/ds923), and 20 monitoring wells were installed during April and June 2014 which are presented in this report. This report presents location data, lithologic logs, well-construction diagrams, and well-development information. Understanding the groundwater system can provide managers with an additional metric for evaluating the effectiveness of salinity and selenium control projects.

  18. 1992 Columbia River Salmon Flow Measures Options Analysis/EIS.

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-01-01

    This Options Analysis/Environmental Impact Statement (OA/EIS) identifies, presents effects of, and evaluates the potential options for changing instream flow levels in efforts to increase salmon populations in the lower Columbia and Snake rivers. The potential actions would be implemented during 1992 to benefit juvenile and adult salmon during migration through eight run-of-river reservoirs. The Corps of Engineers (Corps) prepared this document in cooperation with the Bonneville Power Administration and the Bureau of Reclamation. The US Fish and Wildlife Service (FSWS) is a participating agency. The text and appendices of the document describe the characteristics of 10 Federal projects and onemore » private water development project in the Columbia River drainage basin. Present and potential operation of these projects and their effects on the salmon that spawn and rear in the Columbia and Snake River System are presented. The life history, status, and response of Pacific salmon to current environmental conditions are described.« less

  19. Hydrologic analyses in support of the Navajo Generating Station–Kayenta Mine Complex environmental impact statement

    USGS Publications Warehouse

    Leake, Stanley A.; Macy, Jamie P.; Truini, Margot

    2016-06-01

    IntroductionThe U.S. Department of Interior’s Bureau of Reclamation, Lower Colorado Region (Reclamation) is preparing an environmental impact statement (EIS) for the Navajo Generating Station-Kayenta Mine Complex Project (NGS-KMC Project). The proposed project involves various Federal approvals that would facilitate continued operation of the Navajo Generating Station (NGS) from December 23, 2019 through 2044, and continued operation of the Kayenta Mine and support facilities (collectively called the Kayenta Mine Complex, or KMC) to supply coal to the NGS for this operational period. The EIS will consider several project alternatives that are likely to produce different effects on the Navajo (N) aquifer; the N aquifer is the principal water resource in the Black Mesa area used by the Navajo Nation, Hopi Tribe, and Peabody Western Coal Company (PWCC).The N aquifer is composed of three hydraulically connected formations—the Navajo Sandstone, the Kayenta Formation, and the Lukachukai Member of the Wingate Sandstone—that function as a single aquifer. The N aquifer is confined under most of Black Mesa, and the overlying stratigraphy limits recharge to this part of the aquifer. The N aquifer is unconfined in areas surrounding Black Mesa, and most recharge occurs where the Navajo Sandstone is exposed in the area near Shonto, Arizona. Overlying the N aquifer is the D aquifer, which includes the Dakota Sandstone, Morrison Formation, Entrada Sandstone, and Carmel Formation. The aquifer is named for the Dakota Sandstone, which is the primary water-bearing unit.The NGS is located near Page, Arizona on the Navajo Nation. The KMC, which delivers coal to NGS by way of a dedicated electric railroad, is located approximately 83 miles southeast of NGS (about 125 miles northeast of Flagstaff, Arizona). The Kayenta Mine permit area is located on about 44,073 acres of land leased within the boundaries of the Hopi and Navajo Indian Reservations. KMC has been conducting mining and reclamation operations within the Kayenta Mine permit boundary since 1973.The KMC part of the proposed project requires approval by the Office of Surface Mining (OSM) of a significant revision of the mine’s permit to operate in accordance with the Surface Mine Control and Reclamation Act (Public Law 95-87, 91 Stat. 445 [30 U.S.C. 1201 et seq.]). The revision will identify coal resource areas that may be used to continue extracting coal at the present rate of approximately 8.2 million tons per year. The Kayenta Mine Complex uses water pumped from the D and N aquifers beneath PWCC’s leasehold to support mining and reclamation activities. Prior to 2006, water from the PWCC well field also was used to transport coal by way of a coal-slurry pipeline to the now-closed Mohave Generating Station. Water usage at the leasehold was approximately 4,100 acre-feet per year (acre-ft/yr) during the period the pipeline was in use, and declined to an average 1,255 acre-ft/yr from 2006 to 2011. The Probable Hydrologic Consequences (PHC) section of the mining and reclamation permit must be modified to project the consequences of extended water use by the mine for the duration of the KMC part of the project, including a post-mining reclamation period.Since 1971, the U.S. Geological Survey (USGS) has conducted the Black Mesa Monitoring Program, which consists of monitoring water levels and water quality in the N aquifer, compiling information on water use by PWCC and tribal communities, maintaining several stream-gaging stations, measuring discharge at selected springs, conducting special studies, and reporting findings. These data are useful in evaluating the effects on the N aquifer from PWCC and community pumping, and the effects of variable precipitation.The EIS will assess the impacts of continued pumping on the N aquifer, including changes in storage, water quality, and effects on spring and baseflow discharge, by proposed mining through 2044, and during the reclamation process to 2057.Several groundwater models exist for the area and Reclamation concluded it would conduct a peer review of the groundwater flow model that will be used to assess the direct, reasonably foreseeable indirect, and cumulative effects of future groundwater withdrawals on the D and N aquifers in the Black Mesa area. Reclamation made this determination because of the level of controversy around the effects of continued water use and the comments received from the 2014 draft EIS scoping meetings. Reclamation requested assistance from the USGS in evaluating existing groundwater flow models of the Black Mesa Basin that can be used to predict the effects of different project alternatives on the D and N aquifers.

  20. A New Data Acquisition Portal for the Sacramento River Settlement Contractors

    NASA Astrophysics Data System (ADS)

    Narlesky, P. E., C. A.; Williams, P. E., A. M.

    2017-12-01

    In 1964, the United States Bureau of Reclamation (Reclamation) executed settlement contracts with the Sacramento River Settlement Contractors (SRSC), entities which hold water rights along the Sacramento River with area of origin protection or that are senior to Reclamation's water rights for Shasta Reservoir. Shasta is the cornerstone of the federal Central Valley Project (CVP), one of the nation's largest multi-purpose water conservation programs. In order to optimize CVP operations for multiple beneficial uses including water supply, fisheries, water quality, and waterfowl habitat, the SRSC voluntarily agreed to adaptively manage diversions throughout the year in close coordination with Reclamation. MBK Engineers assists the SRSC throughout this process by collecting, organizing, compiling, and distributing diversion data to Reclamation and others involved in operational decisions related to Shasta Reservoir and the CVP. To improve and expand participation in diversions reporting, we have developed the SRSC Web Portal, which launches a data-entry dashboard for members of the SRSC to facilitate recording and transmittal of both predicted and observed monthly and daily flow diversion data. This cloud-hosted system leverages a combination of Javascript interactive visualization libraries with a database-backed Python web framework to present streamlined data-entry forms and valuable SRSC program summary illustrations. SRSC program totals, which can now be aggregated through queries to the web-app's database backend, are used by Reclamation, SRSC, fish agencies, and others to inform operational decisions. By submitting diversion schedules and tracking actual diversions through the portal, contractors will also be directly contributing to the development of a richer and more consistently-formatted historical record for demand hydrology in the Sacramento River Watershed; this may be useful in future water supply studies. Adoption of this technology will foster an increased appreciation for the historical record of individual and combined Sacramento River diversions relative to the overall system.

  1. Evaluation of Effectiveness and Cost-Benefits of Woolen Roadside Reclamation Products : Implementation Report

    DOT National Transportation Integrated Search

    2017-12-01

    The research project started by reviewing sixteen existing wool products that might be readily adapted for roadside reclamation uses. None of these products showed promise either due to the difficulty in importing them to the U.S., or as a result of ...

  2. Watershed Models for Decision Support for Inflows to Potholes Reservoir, Washington

    USGS Publications Warehouse

    Mastin, Mark C.

    2009-01-01

    A set of watershed models for four basins (Crab Creek, Rocky Ford Creek, Rocky Coulee, and Lind Coulee), draining into Potholes Reservoir in east-central Washington, was developed as part of a decision support system to aid the U.S. Department of the Interior, Bureau of Reclamation, in managing water resources in east-central Washington State. The project is part of the U.S. Geological Survey and Bureau of Reclamation collaborative Watershed and River Systems Management Program. A conceptual model of hydrology is outlined for the study area that highlights the significant processes that are important to accurately simulate discharge under a wide range of conditions. The conceptual model identified the following factors as significant for accurate discharge simulations: (1) influence of frozen ground on peak discharge, (2) evaporation and ground-water flow as major pathways in the system, (3) channel losses, and (4) influence of irrigation practices on reducing or increasing discharge. The Modular Modeling System was used to create a watershed model for the four study basins by combining standard Precipitation Runoff Modeling System modules with modified modules from a previous study and newly modified modules. The model proved unreliable in simulating peak-flow discharge because the index used to track frozen ground conditions was not reliable. Mean monthly and mean annual discharges were more reliable when simulated. Data from seven USGS streamflow-gaging stations were used to compare with simulated discharge for model calibration and evaluation. Mean annual differences between simulated and observed discharge varied from 1.2 to 13.8 percent for all stations used in the comparisons except one station on a regional ground-water discharge stream. Two thirds of the mean monthly percent differences between the simulated mean and the observed mean discharge for these six stations were between -20 and 240 percent, or in absolute terms, between -0.8 and 11 cubic feet per second. A graphical user interface was developed for the user to easily run the model, make runoff forecasts, and evaluate the results. The models; however, are not reliable for managing short-term operations because of their demonstrated inability to match individual storm peaks and individual monthly discharge values. Short-term forecasting may be improved with real-time monitoring of the extent of frozen ground and the snow-water equivalent in the basin. Despite the models unreliability for short-term runoff forecasts, they are useful in providing long-term, time-series discharge data where no observed data exist.

  3. Cultural Competency in Nursing Research.

    PubMed

    Cope, Diane G

    2015-05-01

    According to data from the U.S. Census Bureau (2010), the demographics of the United States will change dramatically in the next 50 years. Non-Caucasians will more than double from 116.2 million in 2012 to 241.3 million by 2060, representing 57% of the U.S. population (U.S. Census Bureau, 2010). The Asian population also is expected to double in the next five years and comprise 8% of the U.S. population (U.S. Census Bureau, 2012). The United States also is becoming an aging population. By 2060, about one in five residents will be aged 65 years and older (U.S. Census Bureau, 2012). Individuals aged 85 years and older will more than triple to 18.2 million and represent 4% of the U.S. population (U.S. Census Bureau, 2012). 
.

  4. 47 CFR 17.58 - Facilities to be located on land under the jurisdiction of the U.S. Forest Service or the Bureau...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... jurisdiction of the U.S. Forest Service or the Bureau of Land Management. 17.58 Section 17.58 Telecommunication... land under the jurisdiction of the U.S. Forest Service or the Bureau of Land Management. Any... the U.S. Forest Service or the Bureau of Land Management shall include a statement that the facilities...

  5. 11. Photographic copy of copy of Twin Lakes Outlet Works ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    11. Photographic copy of copy of Twin Lakes Outlet Works construction drawing dated January 15, 1951. Drawn by W.A. Doe for the Twin Lakes Reservoir and Canal Co. (copy in possession of Bureau of Reclamation, location of original unknown) 'AS CONSTRUCTED' PLANS OF 1949-1950, REHABILITATION OF TWIN LAKES RESERVOIR OUTLET WORKS, DETAILS OF UPSTREAM WING WALLS. - Twin Lakes Dam & Outlet Works, Beneath Twin Lakes Reservoir, T11S, R80W, S22, Twin Lakes, Lake County, CO

  6. 12. Photographic copy of copy of Twin Lakes Outlet Works ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. Photographic copy of copy of Twin Lakes Outlet Works construction drawing dated January 15, 1951. Drawn by W.A. Doe for the Twin Lakes Reservoir and Canal Co. (copy in possession of Bureau of Reclamation, location of original unknown) 'AS CONSTRUCTED' PLANS OF 1949-50, REHABILITATION OF TWIN LAKES RESERVOIR OUTLET WORKS, DETAILS OF DISCHARGE BASIN. - Twin Lakes Dam & Outlet Works, Beneath Twin Lakes Reservoir, T11S, R80W, S22, Twin Lakes, Lake County, CO

  7. FLOAT OPERATED RADIAL GATE HOIST ASSEMBLY LIST OF PARTS ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FLOAT OPERATED RADIAL GATE HOIST ASSEMBLY - LIST OF PARTS - BASE-CRANK. WASTEWAY NO. 1. WELLTON-MOHAWK CANAL - STA. 99+23.50. United States Department of the Interior, Bureau of Reclamation; Gila Project, Arizona, Wellton-Mohawk Division. Drawing No. 50-D-2511, dated May 3, 1949, Denver Colorado. Sheet 1 of 2 - Wellton-Mohawk Irrigation System, Wasteway No. 1, Wellton-Mohawk Canal, North side of Wellton-Mohawk Canal, bounded by Gila River to North & the Union Pacific Railroad & Gila Mountains to south, Wellton, Yuma County, AZ

  8. FLOAT OPERATED RADIAL GATE INSTALLATION. WASTEWAY NO. 1. WELLTONMOHAWK CANAL ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    FLOAT OPERATED RADIAL GATE INSTALLATION. WASTEWAY NO. 1. WELLTON-MOHAWK CANAL - STA. 99+23.50. United States Department of the Interior, Bureau of Reclamation; Gila Project, Arizona, Wellton-Mohawk Division. Drawing No. 50-D-2497, dated March 8, 1949, Denver Colorado. Sheet 1 of 7 - Wellton-Mohawk Irrigation System, Wasteway No. 1, Wellton-Mohawk Canal, North side of Wellton-Mohawk Canal, bounded by Gila River to North & the Union Pacific Railroad & Gila Mountains to south, Wellton, Yuma County, AZ

  9. Summary of fluvial sediment collected at selected sites on the Gunnison River in Colorado and the Green and Duchesne Rivers in Utah, Water Years 2005-2008

    USGS Publications Warehouse

    Williams, Cory A.; Gerner, Steven J.; Elliott, John G.

    2009-01-01

    The Colorado River Basin provides habitat for 14 native fish, including four endangered species protected under the Federal Endangered Species Act of 1973 - Colorado pikeminnow (Ptychocheilus lucius), razorback sucker (Xyrauchen texanus), bonytail (Gila elegans), and humpback chub (Gila cypha). These endangered fish species once thrived in the Colorado River system, but water-resource development, including the building of numerous diversion dams and several large reservoirs, and the introduction of nonnative fish, resulted in large reductions in the numbers and range of the four species. Knowledge of sediment dynamics in river reaches important to specifc life-stages of the endangered fishes is critical to understanding the effects of flow regimes on endangered fish habitats. The U.S. Geological Survey, in cooperation with the Upper Colorado River Endangered Fish Recovery Program, Bureau of Reclamation, U.S. Fish and Wildlife Service, and Wyoming State Engineer's Office, implemented daily sediment sampling at three locations in critical habitat reaches in the Upper Colorado River Basin. This report presents a summary of data collected at these sites, including water and suspended-sediment discharge, streambed compositions, and channel and flood-plain topography. The locations are at U.S. Geological Survey streamflow-gaging stations 09152500, Gunnison River near Grand Junction, Colorado; 09261000, Green River near Jensen, Utah; and 09302000, Duchesne River near Randlett, Utah.

  10. Suspended-sediment transport and storage: A demonstration of acoustic methods in the evaluation of reservoir management strategies for a small water-supply reservoir in western Colorado

    USGS Publications Warehouse

    Williams, Cory A.; Richards, Rodney J.; Collins, Kent L.

    2015-01-01

    The U.S. Bureau of Reclamation (USBR) and local stakeholder groups are evaluating reservoir-management strategies within Paonia Reservoir. This small reservoir fills to capacity each spring and requires approximately half of the snowmelt-runoff volume from its sediment-laden source waters, Muddy Creek. The U.S. Geological Survey is currently conducting high-resolution (15-minute data-recording interval) sediment monitoring to characterize incoming and outgoing sediment flux during reservoir operations at two sites on Muddy Creek. The high-resolution monitoring is being used to establish current rates of reservoir sedimentation, support USBR sediment transport and storage models, and assess the viability of water-storage recovery in Paonia Reservoir. These sites are equipped with in situ, single-frequency, side-looking acoustic Doppler current meters in conjunction with turbidity sensors to monitor sediment flux. This project serves as a demonstration of the capability of using surrogate techniques to predict suspended-sediment concentrations in small streams (less than 20 meters in width and 2 meters in depth). These two sites provide the ability to report near real-time suspended-sediment concentrations through the U.S. Geological Survey National Water Information System (NWIS) web interface and National Real-Time Water Quality websites (NRTWQ) to aid in reservoir operations and assessments.

  11. Bed-material characteristics of the Sacramento–San Joaquin Delta, California, 2010–13

    USGS Publications Warehouse

    Marineau, Mathieu D.; Wright, Scott A.

    2017-02-10

    The characteristics of bed material at selected sites within the Sacramento–San Joaquin Delta, California, during 2010–13 are described in a study conducted by the U.S. Geological Survey in cooperation with the Bureau of Reclamation. During 2010‒13, six complete sets of samples were collected. Samples were initially collected at 30 sites; however, starting in 2012, samples were collected at 7 additional sites. These sites are generally collocated with an active streamgage. At all but one site, a separate bed-material sample was collected at three locations within the channel (left, right, and center). Bed-material samples were collected using either a US BMH–60 or a US BM–54 (for sites with higher stream velocity) cable-suspended, scoop sampler. Samples from each location were oven-dried and sieved. Bed material finer than 2 millimeters was subsampled using a sieving riffler and processed using a Beckman Coulter LS 13–320 laser diffraction particle-size analyzer. To determine the organic content of the bed material, the loss on ignition method was used for one subsample from each location. Particle-size distributions are presented as cumulative percent finer than a given size. Median and 90th-percentile particle size, and the percentage of subsample mass lost using the loss on ignition method for each sample are also presented in this report.

  12. Construction monitoring of full-depth reclamation in Madison County for MDOT project No. NH-0008-03(032).

    DOT National Transportation Integrated Search

    2011-10-01

    This report presents the results of construction monitoring of the full-depth reclamation (FDR) process used on MDOT project number NH-0008-03(032) in Madison County on US49. FDR is a method of pavement rehabilitation in which the entire pavement str...

  13. Construction monitoring of full-depth reclamation in Madison County for MDOT project no. NH-0008-03(032).

    DOT National Transportation Integrated Search

    2010-10-01

    This report presents the results of construction monitoring of the full-depth reclamation (FDR) process used on MDOT project number NH-0008-03(032) in Madison County on US49. FDR is a method of pavement rehabilitation in which the entire pavement str...

  14. Construction monitoring of full-depth reclamation in Madison County for MDOT project no. NH-0008-03(032)

    DOT National Transportation Integrated Search

    2010-10-01

    This report presents the results of construction monitoring of the full-depth reclamation (FDR) process used on MDOT project number NH-0008-03(032) in Madison County on US49. FDR is a method of pavement rehabilitation in which the entire pavement str...

  15. Methow and Columbia Rivers studies: summary of data collection, comparison of database structure and habitat protocols, and impact of additional PIT tag interrogation systems to survival estimates, 2008-2012

    USGS Publications Warehouse

    Martens, Kyle D.; Tibbits, Wesley T.; Watson, Grace A.; Newsom, Michael A.; Connolly, Patrick J.

    2014-01-01

    The U.S. Geological Survey (USGS) received funding from the Bureau of Reclamation (Reclamation) to provide monitoring and evaluation on the effectiveness of stream restoration efforts by Reclamation in the Methow River watershed. This monitoring and evaluation program is designed to partially fulfill Reclamation’s part of the 2008 Biological Opinion for the Federal Columbia River Power System that includes a Reasonable and Prudent Alternative (RPA) to protect listed salmon and steelhead across their life cycle. The target species in the Methow River for the restoration effort include Upper Columbia River (UCR) spring Chinook salmon (Oncorhynchus tshawytscha), UCR steelhead (Oncorhynchus mykiss), and bull trout (Salvelinus confluentus), which are listed as threatened or endangered under the Endangered Species Act. Since 2004, the USGS has completed two projects of monitoring and evaluation in the Methow River watershed. The first project focused on the evaluation of barrier removal and steelhead recolonization in Beaver Creek with Libby and Gold Creeks acting as controls. The majority of this work was completed by 2008, although some monitoring continued through 2012. The second project (2008–2012) evaluated the use and productivity of the middle Methow River reach (rkm 65–80) before the onset of multiple off-channel restoration projects planned by the Reclamation and Yakama Nation. The upper Methow River (upstream of rkm 80) and Chewuch River serve as reference reaches and the Methow River downstream of the Twisp River (downstream of rkm 65) serves as a control reach. Restoration of the M2 reach was initiated in 2012 and will be followed by a multi-year, intensive post-evaluation period. This report is comprised of three chapters covering different aspects of the work completed by the USGS. The first chapter is a review of data collection that documents the methods used and summarizes the work done by the USGS from 2008 through 2012. This data summary was designed to show some initial analysis and to disseminate summary information that could potentially be used in ongoing modeling efforts by USGS, Reclamation, and University of Idaho. The second chapter documents the database of fish and habitat data collected by USGS from 2004 through 2012 and compares USGS habitat protocols to the Columbia Habitat Monitoring Program (CHaMP) protocol. The third chapter is a survival analysis of fish moving through Passive Integrated Transponder (PIT) tag interrogation systems in the Methow and Columbia Rivers. It examines the effects of adding PIT tags and/or PIT tag interrogation systems on survival estimates of juvenile steelhead and Chinook salmon.

  16. Summary and trend analysis of water-quality data for the Oakes Test Area, southeastern North Dakota, 1984-2004

    USGS Publications Warehouse

    Ryberg, Karen R.

    2007-01-01

    The Oakes Test Area is operated and maintained by the Garrison Diversion Conservancy District, under a cooperative agreement with the Bureau of Reclamation, to evaluate the effectiveness and environmental consequences of irrigation. As part of the evaluation, the Bureau of Reclamation collected water-quality samples from seven sites on the James River and the Oakes Test Area. The data were summarized and examined for trends in concentration. A nonparametric statistical test was used to test whether each concentration was increasing or decreasing with time for selected physical properties and constituents, and a trend slope was estimated for each constituent at each site. Trends were examined for two time periods, 1988-2004 and 1994-2004. Results varied by site and by constituent. All sites and all constituents tested had at least one statistically significant trend in the period 1988-2004. Sulfate, total dissolved solids, nitrate, and orthophosphate have significant positive trends at multiple sites with no significant negative trend at any site. Alkalinity and arsenic have single significant positive trends. Hardness, calcium, magnesium, sodium, sodium-adsorption ratio, potassium, and chloride have both significant positive and negative trends. Ammonia has a single significant negative trend. Fewer significant trends were identified in 1994-2004, and all but one were positive. The contribution to the James River from Oakes Test Area drainage appears to have little effect on water quality in the James River.

  17. Canadian and US agencies use bubbles to aid salmon

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    B.C. Hydro, Canada's federal Department of Fisheries and Oceans, and the Bureau of Reclamation in the US have implemented unique bubbler systems that release compressed air to aid fish migration and improve spawning habitat. In each case, compressed air equipment produced bubbles that lifted cool water from a lake bottom to displace warmer water on top. An experimental project during the summer of 1992, involving BC Hydro and the Department of Fisheries and Oceans, succeeded in reducing the mortality rate of sockeye salmon on their migration up the Somass River from the Alberni Inlet to Great Central Lake on Vancouvermore » Island. The bubbler system cooled the water to aid the migration of hundreds of thousands of fish who were reluctant to continue upstream due to exceptionally warm water temperatures. Participants in the project suspended a large lead-weighted plastic curtain (more than 12 meters tall and extending the length of three football fields) from a series of floats across the outlet of Grand Central Lake. Compressed air equipment was installed behind the curtain to produce bubbles to lift cool water from the lake bottom. Water flowing into the river ranged from 1 to 3 degrees cooler than water on the other side of the curtain.« less

  18. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.

    This annual report is a deliverable for fiscal year 2006 (FY06) for Project 2002-077-00, Facilitation of the Estuary/Ocean Subgroup (EOS). The EOS is part of the research, monitoring, and evaluation (RME) effort the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to the 2000 and 2004 Biological Opinions on operation of the Federal Columbia River Power System. The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates implementation of the Estuary RME Plan. In FY06, EOS project accomplishments included: 1) subgroup meetings; 2)more » participation in the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, PISCES; 4) quarterly project status reports; and 5) a major revision to the Estuary RME Plan (new version May 2006) based on comments by EOS members, the Independent Scientific Review Panel, and other reviewers. In the context of uncertainty about the direction of the federal RME due to litigation on the FCRPS Biological Opinion, FY06 activities for the EOS project resulted in expanded substantive coordination with other regional RME forums, project tracking infrastructure, and a new version of the Estuary RME Plan.« less

  19. Characterization of subsurface geologic structure for potential water resources near the Villages of Moenkopi, Arizona, 2009--2010

    USGS Publications Warehouse

    Macy, Jamie P.

    2012-01-01

    The Hopi Tribe depends on groundwater as their primary drinking-water source in the area of the Villages of Moenkopi, in northeastern Arizona. Growing concerns of the potential for uranium contamination at the Moenkopi water supply wells from the Tuba City Landfill prompted the need for an improved understanding of subsurface geology and groundwater near Moenkopi. Information in this report provides the Hopi Tribe with new hydrogeologic information that provides a better understanding of groundwater resources near the Villages of Moenkopi. The U.S. Geological Survey in cooperation with the U.S. Bureau of Reclamation and the Hopi Tribe used the controlled source audio-frequency magnetotelluric (CSAMT) geophysical technique to characterize the subsurface near Moenkopi from December 2009 to September 2010. A total of six CSAMT profiles were surveyed to identify possible fracturing and faulting in the subsurface that provides information about the occurrence and movement of groundwater. Inversion results from the six CSAMT lines indicated that north to south trending fractures are more prevalent than east to west. CSAMT Lines A and C showed multiple areas in the Navajo Sandstone where fractures are present. Lines B, D, E, and F did not show the same fracturing as Lines A and C.

  20. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, GE; Diefenderfer, HL

    The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration (BPA), U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included (1) subgroup meetings; (2) participation inmore » the estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; (3) project management via BPA's project tracking system, Pisces; (4) quarterly project status reports; and (5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on FCRPS operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.« less

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Johnson, Gary E.; Diefenderfer, Heida L.

    The Estuary/Ocean Subgroup (EOS) is part of the research, monitoring, and evaluation (RME) effort that the Action Agencies (Bonneville Power Administration, U.S. Army Corps of Engineers, U.S. Bureau of Reclamation) developed in response to obligations arising from the Endangered Species Act as applied to operation of the Federal Columbia River Power System (FCRPS). The goal of the EOS project is to facilitate activities of the estuary/ocean RME subgroup as it coordinates design and implementation of federal RME in the lower Columbia River and estuary. In fiscal year 2008 (FY08), EOS project accomplishments included 1) subgroup meetings; 2) participation in themore » estuary work group of the Pacific Northwest Aquatic Monitoring Partnership; 3) project management via the project tracking system, Pisces; 4) quarterly project status reports; and 5) a major revision to the Estuary RME document and its subsequent regional release (new version January 2008). Many of the estuary RME recommendations in this document were incorporated into the Biological Opinion on hydrosystem operations (May 2008). In summary, the FY08 EOS project resulted in expanded, substantive coordination with other regional RME forums, a new version of the federal Estuary RME program document, and implementation coordination. This annual report is a FY08 deliverable for the project titled Facilitation of the Estuary/Ocean Subgroup.« less

  2. Real-time demonstration and evaluation of over-the-loop short to medium-range ensemble streamflow forecasting

    NASA Astrophysics Data System (ADS)

    Wood, A. W.; Clark, E.; Newman, A. J.; Nijssen, B.; Clark, M. P.; Gangopadhyay, S.; Arnold, J. R.

    2015-12-01

    The US National Weather Service River Forecasting Centers are beginning to operationalize short range to medium range ensemble predictions that have been in development for several years. This practice contrasts with the traditional single-value forecast practice at these lead times not only because the ensemble forecasts offer a basis for quantifying forecast uncertainty, but also because the use of ensembles requires a greater degree of automation in the forecast workflow than is currently used. For instance, individual ensemble member forcings cannot (practically) be manually adjusted, a step not uncommon with the current single-value paradigm, thus the forecaster is required to adopt a more 'over-the-loop' role than before. The relative lack of experience among operational forecasters and forecast users (eg, water managers) in the US with over-the-loop approaches motivates the creation of a real-time demonstration and evaluation platform for exploring the potential of over-the-loop workflows to produce usable ensemble short-to-medium range forecasts, as well as long range predictions. We describe the development and early results of such an effort by a collaboration between NCAR and the two water agencies, the US Army Corps of Engineers and the US Bureau of Reclamation. Focusing on small to medium sized headwater basins around the US, and using multi-decade series of ensemble streamflow hindcasts, we also describe early results, assessing the skill of daily-updating, over-the-loop forecasts driven by a set of ensemble atmospheric outputs from the NCEP GEFS for lead times from 1-15 days.

  3. Mapping Typha Domingensis in the Cienega de Santa Clara Using Satellite Images, Global Positioning System, and Spectrometry

    USGS Publications Warehouse

    Sanchez, Richard D.; Burnett, Earl E.; Croxen, Fred

    2000-01-01

    The Cienega de Santa Clara, Sonora, Mexico, a brackish wetland area created near the delta of the Colorado River from drainage effluent flowing from the United States since 1977, may undergo changes owing to the operation of the Yuma Desalting Plant in the United States. This has become the largest wetland in the delta region containing rare and endangered species, yet little is known about the environmental impact of these changes. The water quality of the marsh is of growing concern to the Bureau of Reclamation (BOR) which operates the Desalting Plant. Consequently, the BOR solicited the U.S. Geological Survey to investigate the limits and usefulness of satellite, global positioning system (GPS), and spectra data to map the Typha domingensis (cattail) of the Cienega de Santa Clara. Typha domingensis was selected by the BOR as the Cienega de Santa Clara indicator species to best predict the environmental effects of effl uent from the Yuma Desalting Plant. The successful base mapping of Typha domingensis will provide a viable tool for long-term monitoring and stress detection in the Cienega de Santa Clara.

  4. Lower Methow tributaries intensive effectiveness monitoring study. Interim report

    USGS Publications Warehouse

    Martens, Kyle D.; Connolly, Patrick J.

    2008-01-01

    Actions have been taken to replace diversion dams in lower Beaver Creek with a series of rock vortex weirs. Some of these diversion dams have been in place for over 100 years, and they have impaired or completely blocked upstream migration of fish. Three diversion dams were replaced in 2003 (Lower Stokes, Thurlow Transfer, and Upper Stokes), and a forth diversion dam was replaced in 2004 (Fort-Thurlow). These vortex weirs were designed and installed under the supervision of U.S. Bureau of Reclamation (BOR) engineers and completed in accordance to National Marine Fisheries Service (NMFS) and Washington Department of Fisheries and Wildlife (WDFW) fish passage criteria. The projects were designed to meet fish species recovery needs described by the Endangered Species Act (ESA) and the “BiOp” issued by NMFS (2000a). Since no specific guidelines have been identified to date specifically addressing diversion dams, WDFW and NMFS guidelines are being considered as the target design and performance criteria for the sites monitored as part of this project. Where used, the vortex weirs were designed to maintain irrigation diversion capabilities while improving fish passage.

  5. Hydrometallurgical treatment of nickel-metal hydride battery electrodes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lyman, J.W.; Palmer, G.R.

    1995-12-31

    Nickel-metal hydride (Ni-MH) battery electrodes have been developed as a substitute for cadmium-containing negative electrodes. Use of NI-MH electrodes offers enhanced electrochemical properties in many instances as well as reduced environmental toxicity. Rechargeable batteries using NI-MH electrodes are also strong candidates for electric vehicles. During the production and secondary reclamation of these battery types, recycling procedures will be needed to prevent environmental impact caused by these wastes as well as to recover the value inherent in the scrap. The US Bureau of Mines (USBM) is investigating hydrometallurgical technology that separates and recovers purified metallic components from Ni-MH battery scrap ofmore » two types, AB{sub 2} and AB{sub 5}. An investigation of acid dissolution and metal recovery techniques has determined several processing alternatives that may be used to promote the successful recycling of much of the battery fabrication scrap and eventual secondary scrap. The metals recovered are Ni, Co, and rare earth metals. Although recovery techniques have been identified in principal, their applicability to mixed battery waste stream and economic attractiveness remain to be demonstrated.« less

  6. Two-dimensional habitat modeling in the Yellowstone/Upper Missouri River system

    USGS Publications Warehouse

    Waddle, T. J.; Bovee, K.D.; Bowen, Z.H.

    1997-01-01

    This study is being conducted to provide the aquatic biology component of a decision support system being developed by the U.S. Bureau of Reclamation. In an attempt to capture the habitat needs of Great Plains fish communities we are looking beyond previous habitat modeling methods. Traditional habitat modeling approaches have relied on one-dimensional hydraulic models and lumped compositional habitat metrics to describe aquatic habitat. A broader range of habitat descriptors is available when both composition and configuration of habitats is considered. Habitat metrics that consider both composition and configuration can be adapted from terrestrial biology. These metrics are most conveniently accessed with spatially explicit descriptors of the physical variables driving habitat composition. Two-dimensional hydrodynamic models have advanced to the point that they may provide the spatially explicit description of physical parameters needed to address this problem. This paper reports progress to date on applying two-dimensional hydraulic and habitat models on the Yellowstone and Missouri Rivers and uses examples from the Yellowstone River to illustrate the configurational metrics as a new tool for assessing riverine habitats.

  7. Laboratory evaluation of an OTT acoustic digital current meter and a SonTek Laboratory acoustic Doppler velocimeter

    USGS Publications Warehouse

    Vermeyen, T.B.; Oberg, Kevin A.; Jackson, Patrick Ryan

    2009-01-01

    Recently, an acoustic current meter known as the OTT * acoustic digital current meter (ADC) was introduced as an alternative instrument for stream gaging measurements. The Bureau of Reclamation and the U.S. Geological Survey collaborated on a side- by-side evaluation of the ADC and a SonTek/YSI acoustic Doppler velocimeter (ADV). Measurements were carried out in a laboratory flume to evaluate the performance characteristics of the ADC under a range of flow and boundary conditions. The flume contained a physical model of a mountain river with a diversion dam and variety of bed materials ranging from smooth mortar to a cobble bed. The instruments were installed on a trolley system that allowed them to be easily moved within the flume while maintaining a consistent probe orientation. More than 50 comparison measurements were made in an effort to verify the manufacturer’s performance specifications and to evaluate potential boundary disturbance for near-bed and vertical boundary measurements. Data and results from this evaluation are presented and discussed. 

  8. Publications - GMC 295 | Alaska Division of Geological & Geophysical

    Science.gov Websites

    DGGS GMC 295 Publication Details Title: Geochemical assay data from U.S. Bureau of Mines hard-rock . Bureau of Mines, 2000, Geochemical assay data from U.S. Bureau of Mines hard-rock mineral cores (holes

  9. Hydrologic and climatologic data, 1967, Salt Lake County, Utah

    USGS Publications Warehouse

    Hely, A.G.; Mower, Reed W.; Horr, C.A.

    1968-01-01

    An investigation of the water resources of Salt Lake County, Utah, was undertaken by the Water Resources Division of the U.S. Geological Survey in July 1963. This investigation is a cooperative project financed chiefly by equal contributions of the State of Utah and the Federal Government in accordance with an agreement between the Division of Water Rights, Utah Department of Natural Resources, and the Geological Survey. The investigation was financed during the period covered by this report by the following organizations: Utah Division of Water Rights (formerly State Engineer), Utah Division of Water Resources (formerly Water and Power Board), Salt Lake County, Salt Lake County Water Conservancy District, Central Utah Water Conservancy District, Metropolitan Water District of Salt Lake City, City of Murray, Granger-Hunter Improvement District, Taylorsville-Bennion Improvement District, Holladay Water Company, Magna Water and Sewer District, U.S. Bureau of Reclamation, U.S. Geological Survey.The investigation encompasses the collection and interpretation of a large variety of climatologic, hydrologic, and geologic data in and near Salt Lake County. Utah Basic-Data Releases 11-13 contain data collected through 1966. This release contains climatologic and surfacewater data for the 1967 water year (October 1966 to September 1967) and ground-water data collected during the 1967 calendar year. A similar annual release will contain data collected during the remainder of the investigation, and interpretive reports will be prepared as the investigation proceeds. Organizations that furnished data are acknowledged in station descriptions and footnotes to tables.

  10. Hydrologic and climatologic data, 1968, Salt Lake County, Utah

    USGS Publications Warehouse

    1969-01-01

    An investigation of the water resources of Salt Lake County, Utah, was undertaken by the Water Resources Division of the U.S. Geological Survey in July 1963. This investigation is a cooperative project financed chiefly by equal contributions of the State of Utah and the Federal Government in accordance with an agreement between the Division of Water Rights, Utah Department of Natural Resources, and the Geological Survey. The investigation was financed during the period covered by this report by the following organizations: Utah Division of Water Rights (formerly State Engineer), Utah Division of Water Resources (formerly Water and Power Board), Salt Lake County, Salt Lake County Water Conservancy District, Central Utah Water Conservancy District, Metropolitan Water District of Salt Lake City, City of Murray, Granger-Hunter Improvement District, Taylorsville-Bennion Improvement District, Holladay Water Company, Magna Water and Sewer District, U.S. Bureau of Reclamation, U.S. Geological SurveyThe investigation encompasses the collection and interpretation of a large variety of climatologic, hydrologic, and geologic data in and near Salt Lake County. Utah Basic-Data Releases 11-13 and 15 contain data collected through 1967. This release contains climatologic and surface-water data for the 1968 water year (October 1967 to September 1968) and ground-water data collected during the 1968 calendar year. This is the final annual release of basic data for this investigation. Interpretive reports summarizing the results are in preparation. Organizations that furnished data are acknowledged in station descriptions and footnotes to tables.

  11. Saltcedar (Tamarix spp.) and Russian Olive (Elaeagnus angustifolia) in the Western United States-A Report on the State of the Science

    USGS Publications Warehouse

    Shafroth, Patrick

    2010-01-01

    The Salt Cedar and Russian Olive Control Demonstration Act of 2006 (Public Law 109-320) directs the Department of the Interior to submit a report to Congress that includes an assessment of several issues surrounding these two nonnative trees, now dominant components of the vegetation along many rivers in the Western United States. This report was published in 2010 as a U.S. Geological Survey Scientific Investigations Report (available online at http://pubs.usgs.gov/sir/2009/5247). The report was produced through a collaborative effort led by the Bureau of Reclamation and U.S. Geological Survey, with critical contributions from the U.S. Department of Agriculture and from university researchers. The document synthesizes the state of the science and key research needs on the following topics related to management of saltcedar (Tamarix spp.) and Russian olive (Elaeagnus angustifolia) in the Western United States: their distribution and abundance (extent); the potential for water savings associated with controlling these species; considerations related to wildlife use of saltcedar and Russian olive habitat and restored habitats; methods of control and removal; possible utilization of dead biomass following control and removal; and approaches and challenges associated with site revegetation or restoration. A concluding chapter discusses possible long-term management strategies, potentially useful field-demonstration projects, and a planning process for on-the-ground projects involving removal of saltcedar and Russian olive.

  12. Relating Climate Change Risks to Water Supply Planning Assumptions: Recent Applications by the U.S. Bureau of Reclamation (Invited)

    NASA Astrophysics Data System (ADS)

    Brekke, L. D.

    2009-12-01

    Presentation highlights recent methods carried by Reclamation to incorporate climate change and variability information into water supply assumptions for longer-term planning. Presentation also highlights limitations of these methods, and possible method adjustments that might be made to address these limitations. Reclamation was established more than one hundred years ago with a mission centered on the construction of irrigation and hydropower projects in the Western United States. Reclamation’s mission has evolved since its creation to include other activities, including municipal and industrial water supply projects, ecosystem restoration, and the protection and management of water supplies. Reclamation continues to explore ways to better address mission objectives, often considering proposals to develop new infrastructure and/or modify long-term criteria for operations. Such studies typically feature operations analysis to disclose benefits and effects of a given proposal, which are sensitive to assumptions made about future water supplies, water demands, and operating constraints. Development of these assumptions requires consideration to more fundamental future drivers such as land use, demographics, and climate. On the matter of establishing planning assumptions for water supplies under climate change, Reclamation has applied several methods. This presentation highlights two activities where the first focuses on potential changes in hydroclimate frequencies and the second focuses on potential changes in hydroclimate period-statistics. The first activity took place in the Colorado River Basin where there was interest in the interarrival possibilities of drought and surplus events of varying severity relevant to proposals on new criteria for handling lower basin shortages. The second activity occurred in California’s Central Valley where stakeholders were interested in how projected climate change possibilities translated into changes in hydrologic and water supply statistics relevant to a long-term federal Endangered Species Act consultation. Projected climate change possibilities were characterized by surveying a large ensemble of climate projections for change in period climate-statistics and then selecting a small set of projections featuring a bracketing set of period-changes relative to the those from the complete ensemble. Although both methods served the needs of their respective planning activities, each has limited applicability for other planning activities. First, each method addresses only one climate change aspect and not the other. Some planning activities may need to consider potential changes in both period-statistics and frequencies. Second, neither method addresses CMIP3 projected changes in climate variability. The first method bases frequency possibilities on historical information while the second method only surveys CMIP3 projections for change in period-mean and then superimposes those changes on historical variability. Third, artifacts of CMIP3 design lead to interpretation challenges when implementing the second method (e.g., inconsistent projection initialization, model-dependent expressions of multi-decadal variability). Presentation summarizes these issues and also potential method adjustments to address them when defining planning assumptions for water supplies.

  13. New Technologies to Reclaim Arid Lands User's Manual

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    W. K. Ostler

    2002-10-01

    Approximately 70 percent of all U.S. military training lands are located in arid and semi-arid areas. Training activities in such areas frequently adversely affect vegetation, damaging plants and reducing the resilience of vegetation to recover once disturbed. Fugitive dust resulting from a loss of vegetation creates additional problems for human health, increasing accidents due to decreased visibility, and increasing maintenance costs for roads, vehicles, and equipment. Under conventional technologies to mitigate these impacts, it is estimated that up to 35 percent of revegetation projects in arid areas will fail due to unpredictable natural environmental conditions, such as drought, and reclamationmore » techniques that were inadequate to restore vegetative cover in a timely and cost-effective manner. New reclamation and restoration techniques are needed in desert ranges to help mitigate the adverse effects of military training and other activities to arid-land environments. In 1999, a cooperative effort between the U.S. Department of Energy (DOE), the US. Department of Defense (DoD), and selected university scientists was undertaken to focus on mitigating military impacts in arid lands. As arid lands are impacted due to DoD and DOE activities, biological and soil resources are gradually lost and the habitat is altered. A conceptual model of that change in habitat quality is described for varying levels of disturbance in the Mojave Desert. As the habitat quality degrades and more biological and physical resources are lost from training areas, greater costs are required to return the land to sustainable levels. The purpose of this manual is to assist land managers in recognizing thresholds associated with habitat degradation and provide reclamation planning and techniques that can reduce the costs of mitigation for these impacted lands to ensure sustainable use of these lands. The importance of reclamation planning is described in this manual with suggestions about establishing project objectives, scheduling, budgeting, and selecting cost-effective techniques. Reclamation techniques include sections describing: (1) erosion control (physical, chemical, and biological), (2) site preparation, (3) soil amendments, (4) seeding, (5) planting, (6) grazing and weed control, (7) mulching, (8) irrigation, and (9) site protection. Each section states the objectives of the technique, the principles, an in-depth look at the techniques, and any special considerations as it relates to DoD or DOE lands. The need for monitoring and remediation is described to guide users in monitoring reclamation efforts to evaluate their cost-effectiveness. Costs are provided for the proposed techniques for the major deserts of the southwestern U.S. showing the average and range of costs. A set of decision tools are provided in the form of a flow diagram and table to guide users in selecting effective reclamation techniques to achieve mitigation objectives. Recommendations are provided to help summarize key reclamation principles and to assist users in developing a successful program that contributes to sustainable uses of DoD and DOE lands. The users manual is helpful to managers in communicating to installation management the needs and consequences of training decisions and the costs required to achieve successful levels of sustainable use. This users manual focuses on the development of new reclamation techniques that have been implemented at the National Training Center at Fort Irwin, California, and are applicable to most arid land reclamation efforts.« less

  14. Analysis of MIR Condensate and Potable Water

    NASA Technical Reports Server (NTRS)

    Pierre, L. M.; Bobe, L.; Protasov, N. N.; Sauer, R. L.; Schultz, J. R.; Sinyak, Y. E.; Skuratov, V. M.

    1999-01-01

    Approximately fifty percent of the potable water supplied to the Russian cosmonauts, American astronauts, and other occupants of the current Russian Mir Space Station is produced by the direct recycle of water from humidity condensate. The remainder comes from ground supplied potable water that is delivered on a Progress resupply spacecraft, or processed fuel cell water transferred from the Shuttle. Reclamation of water for potable and hygiene purposes is considered essential for extended duration missions in order to avoid massive costs associated with resupplying water from the ground. The Joint U.S/Russian Phase 1 program provided the U.S. the first opportunity to evaluate the performance of water reclamation hardware in microgravity. During the Phase I program, the U.S. collected recycled water, stored water, and humidity condensate samples for chemical and microbial evaluation. This experiment was conducted to determine the potability of the water supplied on Mir, to assess the reliability of the water reclamation and distribution systems, and to aid in developing water quality monitoring standards for International Space Station.

  15. Integrated mined-area reclamation and land-use planning. Volume 3C. A case study of surface mining and reclamation planning: Georgia Kaolin Company Clay Mines, Washington County, Georgia

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guernsey, J L; Brown, L A; Perry, A O

    1978-02-01

    This case study examines the reclamation practices of the Georgia Kaolin's American Industrial Clay Company Division, a kaolin producer centered in Twiggs, Washington, and Wilkinson Counties, Georgia. The State of Georgia accounts for more than one-fourth of the world's kaolin production and about three-fourths of U.S. kaolin output. The mining of kaolin in Georgia illustrates the effects of mining and reclaiming lands disturbed by area surface mining. The disturbed areas are reclaimed under the rules and regulations of the Georgia Surface Mining Act of 1968. The natural conditions influencing the reclamation methodologies and techniques are markedly unique from those ofmore » other mining operations. The environmental disturbances and procedures used in reclaiming the kaolin mined lands are reviewed and implications for planners are noted.« less

  16. Geochemical investigations and interim recommendations for priority abandoned mine sites, BLM lands, upper Animas River watershed, San Juan County, Colorado

    USGS Publications Warehouse

    Nash, J. Thomas

    1999-01-01

    Field observations, sampling of mine dumps and mine drainage waters, and laboratory studies of dump materials have been made at mining areas deemed to be on public lands administered by the U. S. Bureau of Land Management (BLM) in the Upper Animas River watershed. Results of chemical analyses of dump materials, leachates of those materials, and surface waters draining mines or dumps provide indications of where acid is generated or consumed, and metal concentrations below mines or dumps. Information on sites previously identified as needing reclamation is reviewed and available geochemical information is used to rank 26 sites into four classes of priority for reclamation. Although there are more than a thousand mining sites (productive mines and prospects) on BLM lands in the Upper Animas River watershed study area, the majority are very small (less than about 70 cubic yards of dump material), are more than 2 miles from a major stream, or so inaccessible as to prohibit reclamation. In the summers of 1997 and 1998 approximately 200 sites were observed and more than 100 of these that appeared to have the potential to geochemically impact the watershed were examined more carefully and sampled. Building upon the prior work of the BLM and associated agencies, this work attempted to identify the most significant sources of mine-related contamination and to rank those sites as to priority for reclamation. These most significant mining areas have been examined within a geologic framework and were evaluated by multiple criteria, including tendency to generate acid and release toxic metals, observed damage to vegetation, potential to release metals based on leach tests, and likelihood of transport into streams of the watershed. No single measurable parameter, such as metal concentration, can be used to rank the sites. Rather, subjective estimates are required to evaluate combinations or interactions among several parameters. The most subjective estimate, while ranking feasibility of reclamation, is the relative amounts of naturally occurring metals and acidity and mine-related contamination at each mining area. Mitigation of natural contributions at mines or unmined areas is beyond the scope of my studies, but should be considered when planning reclamation. Available information for the 26 priority sites is adequate for ranking, but at some sites additional information on groundwater conditions is needed for a more complete site evaluation.

  17. Interim report on the scientific investigations in the Animas River watershed, Colorado to facilitate remediation decisions by the U.S. Bureau of Land Management and the U.S. Forest Service, March 29, 2000 meeting, Denver, Colorado

    USGS Publications Warehouse

    ,

    2000-01-01

    INTRODUCTION The joint U.S. Department of the Interior and U.S. Department of Agriculture Abandoned Mine Lands Initiative (AMLI) was developed as a collaborative effort between the Federal land management agencies (FLMA, that is the U.S. Bureau of Land Management and the U.S. Forest Service) and the U.S. Geological Survey (USGS) in 1996. The stated goal of the AML Initiative was to develop a strategy for gathering and communicating the scientific information needed to develop effective and cost-efficient remediation of abandoned mines within the framework of a watershed. Four primary objectives of the AMLI are to: 1. Provide the scientific information needed (in the short-term) by the FLMAs to make decisions related to the design and implementation of cleanup actions, 2. Develop a multi-disciplined, multi-division approach that integrates geologic, hydrologic, geochemical and ecological information into a knowledge base for sound decision making, 3. Transfer technologies developed within the scientific programs of the USGS to the field and demonstrate their suitability to solve real, practical problems, and 4. Establish working relationships among involved members of land management and regulatory agencies within the framework of a watershed approach to the cleanup of abandoned mines. Long-term process-based research, including development of analytical tools, is recognized as being critical to the long-term success in remediating watersheds impacted by historical mining activities (AML 5-year plan, http://amli.usgs.gov/amli). In a meeting of Federal agencies (U.S. Bureau of Land Management [BLM], U.S. Bureau of Reclamation [BOR], U.S. National Park Service [NPS], U.S. Forest Service [USFS], the U.S. Environmental Protection Agency [EPA], the U.S. Fish and Wildlife Service [F&WS]), and State agencies (Colorado Division of Public Health and Environment, Colorado Division of Mines and Geology), several watersheds were examined within the state whose water quality was presumed to be impacted by historical mining activities. The Animas River watershed (fig. 1) was selected by the State and Federal agencies as one of two watersheds in the U.S. to be studied in detail by the USGS in the AML Initiative. Beginning in October 1997, each of the four Divisions of the USGS (Water Resources, Geologic, Biological Resources, and National Mapping) initiated a collaborative integrated science study of the watershed. Funds were provided from USGS base funding to each of the four Divisions in response to the priorities set by Congressional action and within the flexibility provided by the budgetary framework funding individual research programs. The AML Initiative provides for a five-year focused scientific effort in the two watersheds with final synthesis of the scientific results from each to be published in 2001. Publications are released on the AML web site on a regular basis (http://amli.usgs.gov/amli). On March 29, 2000, the USGS hosted a meeting for the BLM and USFS to discuss remediation options that were under consideration for the summer of 2000. The purpose of this report is to provide an overview of the scientific rational provided by the USGS to meet objective one above, and to summarize our preliminary interpretations of our data. Additional information from sites on private lands have been collected by the State of Colorado, EPA, and the ARSG. Unfortunately, these data have not been fully supplied to the USGS so our conclusions are based only upon our data. These interpretations provide science-based constraints on possible remediation options to be considered by the FLMA, the State, and local property owners in the Animas River watershed. The report is presented in outline format to facilitate discussion of remediation options at the March 29, 2000 meeting. Not all historical mining sites within the watershed are on public lands. This should not be construed to be a final report of the USGS

  18. Sedimentation Impacts Modeling for the Lower Elwha River

    NASA Astrophysics Data System (ADS)

    Beggs, M.; Kosaka, M.; Sigel, A.; Vandermause, R.; Lauer, J. W.

    2012-12-01

    The removal of Glines Canyon and Elwha Dams from the Elwha River, northwest Washington, is intended to restore natural geomorphic and ecological processes to the Elwha River basin. Prior to the start of dam removal, over 16 million cubic meters of sediment had accumulated in the reservoirs above the two dams. As dam removal progresses, a portion of this sediment will erode and then be deposited on the downstream river bed and floodplain. To address uncertainty in downstream response to the project, the United States Bureau of Reclamation is implementing an adaptive management plan that relies upon continuous monitoring of water levels at a set of stream gages along the river. To interpret the monitoring data and allow for rapid assessment of the rate of downstream sedimentation, we developed rating curves at several locations along the lower Elwha River. The curves consider a range of possible sedimentation scenarios, each involving different sedimentation levels and/or locations. One scenario considers sedimentation primarily in the river channel, another considers sedimentation primarily on the floodplain, and a third considers both possibilities in tandem. We modeled these scenarios using two separate approaches. First, we modified the cross sections in an existing U.S. Army Corps of Engineers HEC-RAS model to represent possible changes associated with geomorphic adjustment to the dam removals. In-channel sedimentation was assumed to occur as a constant fraction of the bankfull depth at any given section, thereby focusing geomorphic change in relatively deep pool areas. In the HEC-RAS model, off-channel sedimentation was assumed uniform. The HEC-RAS model showed that both low-flow and flood hydraulics are much more sensitive to plausible levels of in-channel sedimentation than to plausible levels of overbank sedimentation. The wide floodplain, complex secondary channels, and geomorphic evolution since the original cross sections were surveyed raise some questions regarding the validity of our 1-D HEC-RAS results and motivated our second approach, which involved developing an independent 2-D hydraulic model using the U.S. Bureau of Reclamation SRH-2d program. This model had the added benefit of being able to utilize more recently surveyed bathymetric and topographic data. The 2-D model was used to improve the representation of spatial variability of likely floodplain sedimentation. For this, we used a preliminary run of the program to characterize the water surface elevation for a typical flood event. We then used the modeled water surface as an input for an eight direction pour point determination of flow direction in ArcGIS. This allowed us to approximate the flow distance from the main channel along streamlines crossing the floodplain. Using observed levee morphology, we developed an ad-hoc exponential function for overbank sedimentation as a function of flow distance from the channel. This tended to focus deposition on natural levees at the upstream side of point bars or meander necks. Despite the more narrowly focused zone of floodplain sedimentation, however, the results were consistent with the 1-D result that in-channel sedimentation is like to have a greater relative impact on system-wide hydraulics than does overbank sedimentation.

  19. Second progress report on the cooperative investigation of springs and stream flow in the Tecolote Tunnel area of Santa Barbara County, California

    USGS Publications Warehouse

    Troxell, Harold C.; Burgess, C.E.

    1950-01-01

    This report represents the second of a series of progress reports giving the results of discharge measurements made at more than 100 locations in the Santa Ynez Mountains from the Refugio Canyon on the west to the San Marcos Pass and Painted Cave area on the east. The flow in all the developed springs and headwater streams within this area, here designated as the Tecolote Tunnel Area of the purpose of this report, is generally measured monthly. The primary purpose of this second progress report is to make available to the public all factual data regarding the flow at these locations obtained since the preparation of the first progress report, issued in May 1949. Near the mid-point of this area the Bureau of Reclamation and the Santa Barbara County Water Agency proposed a tunnel, known as Tecolote Tunnel, for the purpose of diverting a portion of the runoff of the Santa Ynez River drainage area into water-deficient Santa Barbara and the coastal areas to the east and west, Because the water users of the mountain springs in the Tecolote Tunnel Area are somewhat apprehensive as to the influence this tunnel may have on their present water supply, the Santa Barbara Water Agency has requested the Geological Survey to obtain records of flow in their springs at frequent and regular intervals. During the current fiscal year these observations have been made as a result of a cooperative agreement between the Geological Survey and the Santa Barbara County Water Agency whereby each paid half the cost of the investigation. During the previous fiscal year all the costs to the Geological Survey in obtaining these observations were completely reimbursed by the Bureau of Reclamation.

  20. 77 FR 46118 - Notice of Inventory Completion: Department of the Interior, Bureau of Indian Affairs, Washington...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-02

    ... Inventory Completion: Department of the Interior, Bureau of Indian Affairs, Washington, DC, and Logan Museum.... SUMMARY: The U.S. Department of the Interior, Bureau of Indian Affairs, and Logan Museum of Anthropology... address below by September 4, 2012. ADDRESSES: Anna Pardo, Museum Program Manager/NAGPRA Coordinator, U.S...

Top