Sample records for us ferc

  1. 75 FR 24828 - Promoting a Competitive Market for Capacity Reassignments

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    ... software should be filed in native applications or print-to-PDF format and not in a scanned format. Mail... Group v. FERC, 225 F.3d 667 (DC Cir. 2000), aff'd sub nom. New York v. FERC, 535 U.S. 1 (2002). 3. With... (1993), aff'd in part and remanded in part sub nom. United Distribution Cos. v. FERC, 88 F.3d 1105 (DC...

  2. 76 FR 31320 - Commission Information Collection Activities (FERC-725B); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... respondent response \\7\\ hours (1) (2) (3) (1) x (2) x (3) FERC-725B: Category 1--Estimate of U.S. 345 1 1,920... 138,720 Entities that have not identified Critical Cyber Assets. Category 3--New U.S. Entities 6 1 3... longer required Category 1: -2...... 1 Category 1 (2 -3,840 to comply with CIP Standards respondents...

  3. Hydropower resources at risk: The status of hydropower regulation and development - 1997

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hunt, R.T.; Hunt, J.A.

    This report documents today`s hydropower licensing and development status based on published data as follows: (a) Federal Energy Regulatory Commission (FERC) databases, maintained by FERC`s Office of Hydropower Licensing, of: (1) operating FERC-regulated projects, federal projects, and known unlicensed projects; (2) surrendered licenses; and, (3) recent licensing and relicensing actions; (b) Energy Information Administration (EIA) data on installed capacity and generation from 1949 through 1995 for the various resources used to produce electricity in the U.S.; and, (c) FERC licensing orders, and environmental assessments or environmental impact statements for each individual project relicensed since 1980. The analysis conducted to preparemore » this paper includes the effects of all FERC hydropower licensing actions since 1980, and applies those findings to estimate the costs of hydropower licensing and development activity for the next 15 years. It also quantifies the national cost of hydropower regulation. The future estimates are quite conservative. The are presented in 1996 dollars without speculating on the effects of future inflation, license surrenders, conditions imposed through open-ended license articles, license terms greater than 30 years, or low water years. Instead, they show the most directly predictable influences on licensing outcomes using actual experiences since ECPA (after 1986).« less

  4. Implications of the Bangor Hydro decision on FERC relicensings

    USGS Publications Warehouse

    Pizzi, L.

    1997-01-01

    In the next 15 years, over 400 existing nonfederal dams will require new licenses by the Federal Energy Regulatory Commission (FERC) in order to continue operations. In many cases, state or federal agencies have a unique opportunity to condition the hydropower licenses to protect environmental values. In 1996, the Court of Appeals for the District of Columbia Circuit issued an opinion striking down a mandatory license condition imposed by the U.S. Department of the Interior in a FERC relicensing. The case, Bangor Hydro-Electric Company v.Federal Energy Regulatory Commission, is instructive for agencies regarding the procedures to be followed in imposing mandatory FERC licensing conditions in the future. After Bangor Hydro, agencies should: (1) support their decisions by substantial evidence in the FERC record, (2) request applicant studies to support agency decisions and allow public comment on the decisions as a means to test the facts and analysis, and (3) consider intervening in a case to defend the condition on appeal. Bangor Hydro also raises, but does not decide, the issue of whether the agency imposing the mandatory condition should engage in balancing the economics of the hydropower project with the public resources affected by the project.

  5. 77 FR 8245 - Commission Information Collection Activities (FERC-65, FERC-65A, and FERC-65B); Comment Request...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-14

    ... collections, FERC-65, FERC-65A, and FERC-65B (Notification of Holding Company Status, Exemption Notification of Holding Company Status, and Waiver Notification of Holding Company Status). DATES: Comments on the... (202) 273-0873. SUPPLEMENTARY INFORMATION: Title: Notification of Holding Company Status (FERC-65...

  6. 78 FR 9679 - Commission Information Collection Activities (FERC-60, FERC-61, & FERC-555A); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-11

    ...: Three-year extension of the FERC-60, FERC-61, & FERC-555A information collection requirements with no... company's functions during the prior calendar year (FERC-61). In complying, a holding company may make a... level of transparency that: (1) Helps protect ratepayers from pass-through of improper service company...

  7. 75 FR 8325 - E.ON U.S. LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER10-295-000] E.ON U.S. LLC; Notice of Filing February 17, 2010. Take notice that, on February 16, 2009, E.ON U.S. LLC filed to... interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov . Persons unable to file...

  8. 77 FR 25156 - Commission Information Collection Activities (FERC-65, FERC-65A, and FERC-65B); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ... companies. Filings may be made in hardcopy or electronically through the Commission's Web site. Type of...) is submitting the information collections Notification of Holding Company Status (FERC-65), Exemption Notification of Holding Company Status (FERC-65A), and Waiver Notification of Holding Company Status (FERC-65B...

  9. 75 FR 2124 - Commission Information Collection Activities (FERC-538, FERC-539, FERC-577, FERC-606, and FERC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-14

    ... Act of 1995 (Pub. L. No. 104-13), the Federal Energy Regulatory Commission (Commission or FERC) is... the service which the applicant has requested the Commission to direct the natural gas pipeline company to render (such as a request to direct a natural gas company to extend or improve its...

  10. Supreme court agrees: FERC must regulate wholesale markets

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wolak, Frank A.

    The author believes that wholesale markets in the United States would have a greater likelihood of ultimately benefiting consumers if the Federal Energy Regulatory Commission did not have the mandate under the Federal Power Act (FPA) to ensure that wholesale prices are ''just and reasonable.'' However, he continues to believe that the FERC cannot avoid having an ex post criteria for asssessing whether market prices are just and reasonable. Moreover, changes in the design and regulatory oversight of U.S. wholesale electricity markets in recent years, including the recent Supreme Court decision, have caused him to believe even more strongly inmore » the guardrails-for-market-outcomes approach. Finally, several questions are addressed which relate to the pricing of fixed-price, long-term contracts and the impact of these obligations on the behavior of suppliers in short-term wholesale markets that are directly relevant to answering the two major questions that the Supreme Court remanded to FERC in its recent decision.« less

  11. 77 FR 73631 - Commission Information Collection Activities (FERC-500 and FERC-505); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-11

    ..., identified by the OMB Control Nos. 1902-0058 (FERC-500) and/or 1902-0114 (FERC-505), should be sent via email.../Relicense for Water Projects with 5 Megawatt or Less Capacity. OMB Control Nos.: FERC-500 (1902-0058); FERC... licenses for non-federal hydroelectric plants. 16 U.S.C. 797(e) also requires the Commission to give equal...

  12. 78 FR 26766 - Commission Information Collection Activities (FERC Form 580); Comment Request; Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-08

    ... Information Collection Activities (FERC Form 580); Comment Request; Revision AGENCY: Federal Energy Regulatory... collection, FERC Form No. 580 (Interrogatory on Fuel and Energy Purchase Practices). DATES: Comments on the... (FERC Form No. 580). OMB Control No.: 1902-0131. Type of Request: Three-year approval of the FERC Form...

  13. 78 FR 43871 - Commission Information Collection Activities (FERC-580); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-22

    ... submitting the information collection, FERC Form No. 580 (Interrogatory on Fuel and Energy Purchase Practices.... SUPPLEMENTARY INFORMATION: Title: Interrogatory on Fuel and Energy Purchase Practices (FERC Form No. 580), OMB...: Three-year approval of the FERC Form No. 580. Abstract: FERC Form No. 580 is collected in even numbered...

  14. 78 FR 23553 - Trunkline Gas Company, LLC; Notice of Availability of the Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... available for public viewing on the FERC's Web site ( www.ferc.gov ) using the eLibrary link. A limited... Affairs, at (866) 208-FERC, or on the FERC Web site ( www.ferc.gov ) using the eLibrary link. Click on the... systems and portions of compressor stations (CS) located in numerous counties in Illinois, Kentucky...

  15. 75 FR 21623 - Commission Information Collection Activities (FERC Form Nos. 6 and 6-Q); Comment Request...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-26

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. IC10-6-001 and IC10-6Q-001] Commission Information Collection Activities (FERC Form Nos. 6 and 6-Q); Comment Request; Submitted for OMB... (75FR5061, 2/1/ 2010) requesting public comments. FERC received one comment on the FERC Form No. 6 and FERC...

  16. 75 FR 15424 - Commission Information Collection Activities (FERC-538, FERC-539, FERC-577, FERC-606, and FERC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-29

    ... Natural Gas Act (NGA) (Pub. L. 75-688) (15 U.S.C. 717-717w), upon application by a local distribution... the Commission to direct the natural gas pipeline company to render (such as a request to direct a...-539. Section 3 of the Natural Gas Act (NGA) (Pub. L. 75-688) (15 U.S.C. 717-717w) provides, in part...

  17. 75 FR 15701 - City of Keene, NH; Notice of Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-30

    ..., NH 03431; (603) 357-9804; JMacLean@ci.keene.nh.us . i. FERC Contact: Kelly Houff, (202) 502-6393... Hydropower Administration and Compliance, Office of Energy Projects, Federal Energy Regulatory Commission, at...

  18. Hydropower Licensing as a Bridge between Climate Science and Applications: Creating Actionable Science for Regulatory Decisionmaking

    NASA Astrophysics Data System (ADS)

    Ray, A. J.; Barsugli, J. J.; Walker, S. H.

    2016-12-01

    The Integrated Licensing Process (ILP) of the US Federal Energy Regulatory Commission (FERC) is an example of an existing regulatory process that has the capacity to bridge the gap between science and decision making by clearly delineating existing science, the climate-regulatory nexus, and additional scientific work needed to inform licensing or relicensing of non-federal hydropower projects. In a parallel, but interacting set of legal and regulatory processes, NOAA's National Marine Fisheries Service (NMFS) must conduct analyses based on the best available science in order to implement the requirements of the Endangered Species Act (ESA), the Magnuson-Stevens Act, and NEPA, and to develop terms and conditions to protect fisheries for the 30-50 year term of the license and the longer life of the project itself. Therefore, NMFS must understand the combined effects of hydropower projects and climate change to fulfill its own mandates to protect anadromous fish, protected species and habitat. Federal Executive Order (EO) #13693 on climate change sustainability require use of climate risks in planning, also recommended in NOAA's own guidance on implementing ESA, and the Council on Environmental Quality (CEQ) guidance on implementing NEPA; however, as an independent agency FERC is not subject to that EO. In the past, FERC has consistently rejected NMFS' climate study requests, stating, among other reasons, that climate science is `too uncertain,' and therefore not actionable. Thus, in order for NMFS to get the information needed for its own decision process, NOAA must first persuade FERC that the science is actionable. This presentation will describe our experiences in a multi-year effort by an interdisciplinary team of climate and fishery scientists to develop acceptable climate study requests that address FERC's concerns about uncertainty, for the Susitna-Watana project on Alaska's Susitna River, the LaGrange Project on the Tuolumne R. in California, and the Hiram Project on the Saco R. in Maine. Furthermore, we document that climate studies are needed to meet FERC's own standard that study methodologies be "generally accepted practice" in the community, i.e., that water infrastructure planning and management has evolved to include use of climate risk assessments as best practices.

  19. 78 FR 29359 - Commission Information Collection Activities (Ferc-604); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-20

    ... Regulatory Commission (Commission or FERC) is soliciting public comment on FERC- 604, Cash Management... fax at (202) 273-0873. SUPPLEMENTARY INFORMATION: Title: FERC-604, Cash Management Agreements. OMB... requirements. Abstract: Cash management or ``money pool'' programs typically concentrate affiliates' cash...

  20. 78 FR 23554 - Sierrita Gas Pipeline LLC; Supplemental Notice of Intent To Prepare an Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-19

    ... Aires National Wildlife Refuge), the Arizona Game and Fish Department, and the U.S. Customs and Border... Online Support at FercOnline[email protected] or toll free at (866) 208-3676, or for TTY, contact (202...

  1. 77 FR 56636 - Commission Information Collection Activities (FERC-500 & FERC-505); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-13

    ...) to provide the Commission with the responsibility of issuing licenses for non-federal hydroelectric... States public. Types of Respondents: Non-federal hydroelectric plants greater than 5 megawatt capacity (FERC-500); non-federal hydroelectric plants less than 5 megawatts capacity (FERC-505). Estimate of...

  2. 77 FR 6550 - Commission Information Collection Activities (FERC-725A); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ... submitting the information collection FERC-725A, Mandatory Reliability Standards for the Bulk- Power System... Reliability Standard, in an order published in the Federal Register (76 FR 72197, 11/22/2011). FERC received...) 273-0873. SUPPLEMENTARY INFORMATION: Title: FERC-725A, Mandatory Reliability Standards for the Bulk...

  3. 76 FR 34216 - Commission Information Collection Activities (Ferc-521), Proposed Collection; Comment Request...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-13

    ... Information Collection Activities (Ferc-521), Proposed Collection; Comment Request; Submitted for OMB Review... information collection described below. DATES: Comments in consideration of the collection of information are... comments and FERC issuances may be viewed, printed or downloaded remotely through FERC's eLibrary at http...

  4. 2002 Industry Studies: Energy

    DTIC Science & Technology

    2002-01-01

    the Public Utility Regulatory Policy Act ( PURPA ), one of five statutes aimed at reducing U.S. dependence on foreign oil.77 This law required utilities...restructuring was in the area of pricing. Under the framework established by PURPA and the FERC orders, a wholesale power market between utilities and IPPs

  5. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Parsons, B.; Porter, K.

    In 1996, the Federal Energy Regulatory Commission (FERC) issued Order 888, which required transmission-owning utilities under FERC jurisdiction to provide open access transmission service to eligible wholesale power customers. Among other things, the elements of electric service are unbundled, meaning that wind project developers must not only find a taker for the energy but also potentially make interconnection, ancillary service, and transmission arrangements for their wind projects. In 1999, the FERC issued Order 2000, which required transmission-owning utilities to file an intent with FERC on whether they have joined or plan to join a regional transmission organization (RTO). Order 2000more » also required RTOs to meet certain criteria and be approved by FERC in order to begin operations as an RTO. More recently, FERC said it would issue a Notice of Proposed Rulemaking in 2002 on certain requirements and services, often termed''standard market design'' (SMD), that must be included in all transmission tariffs filed at FERC. This paper discusses the chronology of open access transmission issues, from Order 888 onward, and reviews some of the important issues raised by FERC's SMD initiative.« less

  6. 76 FR 74781 - Sawgrass Storage LLC; Notice of Availability of the Environmental Assessment for the Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-01

    ... Affairs, at (866) 208-FERC, or on the FERC Web site ( http://www.ferc.gov ) using the eLibrary link. Click... Midcontinent Express Pipeline's interstate pipeline system; and appurtenant facilities. The FERC staff mailed... interested individuals and groups; newspapers and libraries in the project area; and parties to this...

  7. 75 FR 35776 - Commission Information Collection Activities (FERC Form No. 80); Comment Request; Submitted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-23

    ... Information Collection Activities (FERC Form No. 80); Comment Request; Submitted for OMB Review June 16, 2010... interested person may file comments directly with OMB and should address a copy of those comments to the.../2010) requesting public comments. FERC received no comments on the FERC Form No. 80 and has made this...

  8. 78 FR 24188 - Commission Information Collection Activities (FERC-500 and FERC-505); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-24

    ... information are due by May 9, 2013. ADDRESSES: Comments filed with OMB, identified by the OMB Control Nos... Projects with 5 Megawatt or Less Capacity. OMB Control Nos.: FERC-500 (1902-0058); FERC-505 (1902-0114... Power Act to provide the Commission with the responsibility of issuing licenses for non-federal...

  9. 76 FR 81928 - Kansas City, KS, Board of Public Utilities; Notice of Petition for Waiver

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-29

    .... \\1\\ Open Access Same-Time Information System and Standards of Conduct, Order No. 889, FERC Stats. & Regs. ] 31,035 (1996), order on reh'g, Order No. 889-A, FERC Stats. & Regs. ] 31,049 (1997), reh'g... Providers, Order No. 2004, FERC Stats. & Regs. ] 31,155 (2003), order on reh'g, Order No. 2004-A, FERC Stats...

  10. 78 FR 25434 - Minnesota Municipal Power Agency; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ..., 61 FR 21,737, FERC Stats. & Regs. ] 31,035 (1996), order on reh'g, Order No. 889-A, 62 FR 12,484, FERC Stats. & Regs. ] 31,049 (1997) (Order No. 889-A), reh'g denied, Order No. 889-B, 81 FERC ] 61,253.... Cir. 2000). \\2\\ Standards of Conduct for Transmission Providers, Order No. 2004, FERC Stats. & Regs...

  11. 18 CFR 366.4 - FERC-65, notification of holding company status, FERC-65A, exemption notification, and FERC-65B...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false FERC-65, notification... Section 366.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT... NATURAL GAS ACT BOOKS AND RECORDS Definitions and Provisions Under PUHCA 2005, the Federal Power Act and...

  12. 18 CFR 366.4 - FERC-65, notification of holding company status, FERC-65A, exemption notification, and FERC-65B...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false FERC-65, notification... Section 366.4 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT... NATURAL GAS ACT BOOKS AND RECORDS Definitions and Provisions Under PUHCA 2005, the Federal Power Act and...

  13. 18 CFR 141.400 - FERC Form No. 3-Q, Quarterly financial report of electric utilities, licensees, and natural gas...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false FERC Form No. 3-Q... AND REPORTS (SCHEDULES) § 141.400 FERC Form No. 3-Q, Quarterly financial report of electric utilities..., licensees, and natural gas companies, designated as FERC Form No. 3-Q, is prescribed for the reporting...

  14. 18 CFR 141.400 - FERC Form No. 3-Q, Quarterly financial report of electric utilities, licensees, and natural gas...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false FERC Form No. 3-Q... AND REPORTS (SCHEDULES) § 141.400 FERC Form No. 3-Q, Quarterly financial report of electric utilities..., licensees, and natural gas companies, designated as FERC Form No. 3-Q, is prescribed for the reporting...

  15. 18 CFR 141.400 - FERC Form No. 3-Q, Quarterly financial report of electric utilities, licensees, and natural gas...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false FERC Form No. 3-Q... AND REPORTS (SCHEDULES) § 141.400 FERC Form No. 3-Q, Quarterly financial report of electric utilities..., licensees, and natural gas companies, designated as FERC Form No. 3-Q, is prescribed for the reporting...

  16. 18 CFR 141.400 - FERC Form No. 3-Q, Quarterly financial report of electric utilities, licensees, and natural gas...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false FERC Form No. 3-Q... AND REPORTS (SCHEDULES) § 141.400 FERC Form No. 3-Q, Quarterly financial report of electric utilities..., licensees, and natural gas companies, designated as FERC Form No. 3-Q, is prescribed for the reporting...

  17. 18 CFR 260.300 - FERC Form No. 3-Q, Quarterly financial report of electric utilities, licensees, and natural gas...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false FERC Form No. 3-Q... ENERGY APPROVED FORMS, NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.300 FERC Form No. 3-Q... as FERC Form No. 3-Q, is prescribed for the reporting quarter ending March 31, 2004, and each quarter...

  18. 18 CFR 260.300 - FERC Form No. 3-Q, Quarterly financial report of electric utilities, licensees, and natural gas...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false FERC Form No. 3-Q... ENERGY APPROVED FORMS, NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.300 FERC Form No. 3-Q... as FERC Form No. 3-Q, is prescribed for the reporting quarter ending March 31, 2004, and each quarter...

  19. 18 CFR 260.300 - FERC Form No. 3-Q, Quarterly financial report of electric utilities, licensees, and natural gas...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false FERC Form No. 3-Q... ENERGY APPROVED FORMS, NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.300 FERC Form No. 3-Q... as FERC Form No. 3-Q, is prescribed for the reporting quarter ending March 31, 2004, and each quarter...

  20. 18 CFR 260.300 - FERC Form No. 3-Q, Quarterly financial report of electric utilities, licensees, and natural gas...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false FERC Form No. 3-Q... ENERGY APPROVED FORMS, NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.300 FERC Form No. 3-Q... as FERC Form No. 3-Q, is prescribed for the reporting quarter ending March 31, 2004, and each quarter...

  1. 77 FR 31607 - Commission Information Collection Activities (FERC-587); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-29

    ... improvement of navigation and for the development, transmission, and utilization of power across, along, from... applicable U.S. land. \\1\\ 16 U.S.C. 797d (2010). \\2\\ Public Law 99-495, 100 Stat. 1243 (1996). The... of information technology. Dated: May 21, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012-12869...

  2. FERC ruling highlights differences between notification and certification procedures for qualifying facilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1984-06-01

    On June 15, the FERC dismissed a motion by the Puerto Rico Electric Power Authority (PREPA) to intervene to challenge the filing of Merck, Sharp and Dohme Quimica De Puerto Rico, Inc. (Merck), for qualifying status under PURPA. (Docket QF 84-188). The FERC's reason for dismissing the motion for intervention was that the Merck submission was not a true application for certification, but rather, merely a notice that the proposed facility would in fact be a qualifying facility. Under FERC rules, a qualifying cogenerator or small power producer may follow either of two procedures: (1) an application procedure, under whichmore » the FERC will rule on whether a particular facility is a qualifying facility, or (2) a notification procedure, under which FERC does not rule. The application is a voluntary, optional procedure, provided by FERC for situations in which a potential qualifying facility requires affirmative certification, typically for financing purposes. Otherwise, merely filing a notification is sufficient for a qualifying facility to be able to take advantage of the benefits of PURPA.« less

  3. 78 FR 25431 - Revised Information Collection Activities (FERC-545, FERC-549, and FERC-550); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... registration account with a superior method of authentication. Under the revised procedures, each regulated... pipeline has authorized to submit a particular type of filing. Implementation of these changes will provide...

  4. Toward an SEC-FERC memorandum of understanding. [SEC-FERC (Securities and Exchange Commission-Federal Energy Regulatory Commission)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Moeller, J.W.

    1994-01-01

    The Securities and Exchange Commission (SEC) is under fire. For the past year, Congress has criticized its administration of the Public Utility Holding Company Act of 1935 (PUHCA). The criticism might persuade Congress to transfer the administration of PUHCA from the SEC to the Federal Energy Regulatory Commission (FERC). Section I of this article briefly describes the events of the past year and the implications of transfer of PUHCA from the SEC to the FERC. Section II of this article discusses the background relationship of PUHCA, under which the SEC regulates the securities transactions of public utilities, to the Federalmore » Power Act, under which the FERC regulates the rates of public utilities. Section III discusses the case involving the Ohio Power Company, which resulted in a November 1990 decision of the Supreme Court, that recently has highlighted the conflict in jurisdiction between the SEC and the FERC relative to the regulation of public utilities. Section IV discusses the immediate responses to that conflict--a proposed amendment to a FERC regulation and S. 544--and the reasons that neither response is an ideal solution. Section V proposes an alternative to those immediate responses--the Memorandum of Understanding. An Appendix is provided which proposes a draft Memorandum of Understanding between the SEC and the FERC.« less

  5. 77 FR 5508 - Order on Intent To Revoke Market-Based Rate Authority

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-03

    .... 2001, FERC Stats. & Regs. ] 31,127, reh'g denied, Order No. 2001-A, 100 FERC ] 61,074, reconsideration... market-based rates.\\2\\ \\2\\ Order No. 2001, FERC Stats & Regs. ] 31,127 at P 222. 4. The Commission...

  6. 76 FR 43996 - Commission Information Collection Activities (FERC-510); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC11-510-000] Commission Information Collection Activities (FERC-510); Comment Request; Extension AGENCY: Federal Energy Regulatory...) 273-0873. SUPPLEMENTARY INFORMATION: The information collected under the requirements of FERC-510...

  7. 78 FR 47311 - Ohio Power Company; AEP Generation Resources, Inc.; Notice of Application for Transfer of License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-05

    ... Project, FERC No. 2570, located at the U.S. Corps of Engineers Racine Locks and Dam on the Ohio River in... McDonough, Assistant General Counsel--Real Estate, American Electric Power Service Corporation, 1 Riverside..., American Electric Power Service Corporation, 40 Franklin Road, Roanoke, VA 24011, telephone (540) 985-2875...

  8. 77 FR 67056 - Application for a Presidential Permit To Operate and Maintain Pipeline Facilities on the Border...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-08

    ... transport natural gas liquids (``NGLs'') extending from a block valve site in St. Clair County, Michigan... Storage LLC., by FERC. Because NOVA intends to place Line 20 facilities back into natural gas liquids... gas liquids would be in the U.S. national interest. DATES: Interested parties are invited to submit...

  9. 77 FR 19279 - Northern Indiana Public Service Company; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-30

    ... Transmission Investment Through Pricing Reform, Order No. 679, FERC Stats. & Regs. ] 31,222, order on reh'g, Order No. 679-A, FERC Stats. & Regs. ] 3l 31,236 (2006), order on reh'g, 119FERC ] 61,062 (2007). Any...

  10. 76 FR 30342 - Gulf South Pipeline Company, LP; Notice of Request for Waiver

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-25

    ... Conduct for Transmission Providers, FERC Stats. & Regs. 31,280 (2008) (Order No 717), order on reh'g, FERC Stats. & Regs. ] 31,297 (2009) (Order No. 717-A, order on reh'g, 129 FERC ]61,123 (2009) (Order No. 717B...

  11. 75 FR 7466 - Commission Information Collection Activities (FERC-912 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC09-912-001] Commission Information Collection Activities (FERC-912 \\1\\), Supplemental Notice February 3, 2010. AGENCY: Federal Energy Regulatory Commission. \\1\\ FERC-912 (``Cogeneration and Small Power Production, PURPA Section 210(m...

  12. 77 FR 58365 - Commission Information Collection Activities (FERC-912); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    ... collection, FERC-912, Cogeneration and Small Power Production, PURPA Section 210(m) Regulations for...-0873. SUPPLEMENTARY INFORMATION: Title: FERC-912, Cogeneration and Small Power Production, PURPA... the Public Utility Regulatory Policies Act of 1978 (PURPA) by adding subsection ``(m)'' that provides...

  13. 77 FR 40348 - Commission Information Collection Activities (FERC-546); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-09

    ... information collection, FERC-546, Certificated Filings: Gas Pipeline Rates. DATES: Comments on the collection... (202) 273-0873. SUPPLEMENTARY INFORMATION: Title: FERC-546, Certificated Filings: Gas Pipeline Rates... transportation, natural gas storage, and unbundled sales activities of interstate natural gas pipelines and...

  14. 75 FR 64301 - Commission Information Collection Activities (FERC-537); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-19

    ... Information Collection Activities (FERC-537); Comment Request; Extension October 8, 2010. AGENCY: Federal Energy Regulatory Commission. ACTION: Notice of proposed information collection and request for comments... (Commission or FERC) is soliciting public comment on the proposed information collection described below...

  15. Optimizing the U.S. Electric System with a High Penetration of Renewables

    NASA Astrophysics Data System (ADS)

    Corcoran, B. A.; Jacobson, M. Z.

    2012-12-01

    As renewable energy generators are increasingly being installed throughout the U.S., there is growing interest in interconnecting diverse renewable generators (primarily wind and solar) across large geographic areas through an enhanced transmission system. This reduces variability in the aggregate power output, increases system reliability, and allows for the development of the best overall group of renewable technologies and sites to meet the load. Studies are therefore needed to determine the most efficient and economical plan to achieve large area interconnections in a future electric system with a high penetration of renewables. This research quantifies the effects of aggregating electric load and, separately, electric load together with diverse renewable generation throughout the ten Federal Energy Regulatory Commission (FERC) regions in the contiguous U.S. The effects of aggregating electric load alone -- including generator capacity capital cost savings, load energy shift operating cost savings, reserve requirement cost savings, and transmission costs -- were calculated for various groupings of FERC regions using 2006 data. Transmission costs outweighed cost savings due to aggregation in nearly all cases. East-west transmission layouts had the highest overall cost, and interconnecting ERCOT to adjacent FERC regions resulted in increased costs, both due to limited existing transmission capacity. Scenarios consisting of smaller aggregation groupings had the lowest overall cost. This analysis found no economic case for further aggregation of load alone within the U.S., except possibly in the West and Northwest. If aggregation of electric load is desired, then small, regional consolidations yield the lowest overall system cost. Next, the effects of aggregating electric load together with renewable electricity generation are being quantified through the development and use of an optimization tool in AMPL (A Mathematical Programming Language). This deterministic linear program solves for the least-cost organizational structure and system (generator, transmission, storage, and reserve requirements) for a highly renewable U.S. electric grid. The analysis will 1) examine a highly renewable 2006 electric system, and 2) create a "roadmap" from the existing 2006 system to a highly renewable system in 2030, accounting for projected price and demand changes and generator retirements based on age and environmental regulations. Ideally, results from this study will offer insight for a federal renewable energy policy (such as a renewable portfolio standard) and how to best organize regions for transmission planning.

  16. 75 FR 40817 - City of Pella, Iowa, v. Midwest Independent Transmission System Operator, Inc., MidAmerican...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-14

    ... Public Utilities and Transmitting Utilities, Order No. 888, FERC Stats. & Regs. ] 31,036 (1996), order on reh'g, Order No. 888-A, FERC Stats. & Regs. ] 31,048, order on reh'g, Order No. 888-B, 81 FERC ] 61...

  17. 77 FR 26537 - Notice of Commissioners and Staff Attendance at FERC Leadership Development Program Graduation...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-04

    ... Attendance at FERC Leadership Development Program Graduation/Induction Ceremony The Federal Energy Regulatory... may attend the following event: FERC Leadership Development Program Graduation/Induction Ceremony: 888... and welcome 17 employees selected for the 2012 Leadership Development Program and graduate 15...

  18. 78 FR 28825 - Commission Information Collection Activities (FERC-577); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC13-12-000] Commission Information Collection Activities (FERC-577); Comment Request AGENCY: Federal Energy Regulatory Commission... Act of 1995, 44 USC 3507(a)(1)(D), the Federal Energy Regulatory Commission (Commission or FERC) is...

  19. 77 FR 2963 - Commission Information Collection Activities (FERC-725F); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... submitting the information collection FERC-725F, ``Mandatory Reliability Standards for Nuclear Plant...: Title: FERC-725F Mandatory Reliability Standards for Nuclear Plant Interface Coordination OMB Control No... added a new section 215 to the FPA, which required a Commission-certified Electric Reliability...

  20. 76 FR 34689 - Commission Information Collection Activities [FERC-583], Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC11-583-000] Commission Information Collection Activities [FERC-583], Comment Request; Extension AGENCY: Federal Energy Regulatory.... 3506(c)(2)(A) (2006), (Pub. L. 104-13), the Federal Energy Regulatory Commission (Commission or FERC...

  1. 77 FR 58115 - Commission Information Collection Activities (FERC-546); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... information collection FERC-546 (Certificated Filings: Gas Pipeline Rates) to the Office of Management and... fax at (202) 273-0873. SUPPLEMENTARY INFORMATION: Title: FERC-546, Certificated Filings: Gas Pipeline... gas storage, and unbundled sales activities of interstate natural gas pipelines and Hinshaw \\1...

  2. 76 FR 12094 - Whitman River Dam, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    [email protected]net . i. FERC Contact: Jeff Browning, (202) 502-8677 or [email protected] . j. Cooperating....ferc.gov/docs-filing/ferconline.asp ). Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp...

  3. 75 FR 59707 - Electric Quarterly Reports; BM2 LLC; DJGW, LLC; Order on Intent To Revoke Market-Based Rate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-28

    .... 2001, FERC Stats. & Regs. ] 31,127, reh'g denied, Order No. 2001-A, 100 FERC ] 61,074, reconsideration...-based rates.\\[2]\\ \\2\\ Order No. 2001, FERC Stats & Regs. ] 31,127 at P 222. 4. The Commission further...

  4. 76 FR 5799 - Notice of Commissioners and Staff Attendance at FERC Leadership Development Program Induction...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-02

    ... Attendance at FERC Leadership Development Program Induction Ceremony January 26, 2011. The Federal Energy... Commission staff may attend the following event: FERC Leadership Development Program Induction Ceremony: 888... welcome 16 employees selected for the 2011 Leadership Development Program. Kimberly D. Bose, Secretary...

  5. 76 FR 46781 - Commission Information Collection Activities (FERC Form 1 and FERC Form 1F); Comment Request...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ... Commission's chart of accounts and related accounting instructions permits comparability and financial... industry, would be difficult to achieve if each company maintained its own accounting records using dissimilar accounting methods and classifications to record similar transactions and events. The FERC Annual...

  6. 77 FR 20383 - Notice of Revisions to FERC Online, eSubscription Service

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-04

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Revisions to FERC Online, eSubscription Service Take notice that on March 30, 2012, the Federal Energy Regulatory Commission (Commission...Library in a subscribed-to docket. eSubscription is one of the Commission's ``FERC Online'' services...

  7. 78 FR 21929 - Transmission Relay Loadability Reliability Standard; Notice of Compliance Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ... Relay Loadability Reliability Standard; Notice of Compliance Filing Take notice that on February 19... Relay Loadability Reliability Standard, Order No. 733, 130 FERC ] 61,221 (2010) (Order No. 733); order..., 136 FERC ] 61,185 (2011). \\2\\ Transmission Relay Loadability Reliability Standard, 138 FERC ] 61,197...

  8. 77 FR 59607 - El Paso Natural Gas Company; Notice of Public Scoping Meetings for the Planned SASABE Lateral...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-28

    ... Schoolhouse Drive, Sasabe, AZ 85633. \\1\\ A Spanish-English translator will be provided at this meeting. All... External Affairs, at (866) 208-FERC, or on the FERC Web site at www.ferc.gov using the ``eLibrary'' link...

  9. 75 FR 9199 - Combined Notice of Filings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-01

    ...Mobil Gas & Power Marketing Company and amendments to the Service Agreements. Filed Date: 02/19/2010... of protests and interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov... notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service...

  10. 75 FR 5063 - Commission Information Collection Activities (FERC-729); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-01

    ... Information Collection Activities (FERC-729); Comment Request; Submitted for OMB Review January 22, 2010... Regulatory Commission (Commission or FERC) has submitted the information collection described below to the Office of Management and Budget (OMB) for review of the information collection requirements. Any...

  11. 76 FR 4888 - Commission Information Collection Activities (FERC-537); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... Information Collection Activities (FERC-537); Comment Request; Submitted for OMB Review January 20, 2011... Regulatory Commission (Commission or FERC) has submitted the information collection described below to the Office of Management and Budget (OMB) for review of the information collection requirements. Any...

  12. 76 FR 65717 - City of Broken Bow, OK; Notice of Availability of Final Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-24

    ... application for an Original Major License for the Broken Bow Re-Regulation Dam Hydropower Project (FERC Project No. 12470-001). The Broken Bow Re-Regulation Dam Project is proposed to be located on the Mountain Fork River in McCurtain County, Oklahoma, at the U.S. Army Corps of Engineers' Broken Bow Re-Regulation...

  13. 76 FR 64932 - Commission Information Collection Activities (FERC-510); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC11-510-001] Commission Information Collection Activities (FERC-510); Comment Request; Submitted for OMB Review AGENCY: Federal Energy... received no comments on the FERC-510 and has made this notation in its submission to OMB. DATES: Comments...

  14. 18 CFR 141.300 - FERC Form No. 715, Annual Transmission Planning and Evaluation Report.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... FERC Form No. 715, Annual Transmission Planning and Evaluation Report. (a) Who must file. Any... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false FERC Form No. 715, Annual Transmission Planning and Evaluation Report. 141.300 Section 141.300 Conservation of Power and...

  15. 75 FR 42747 - Smart Grid Update; Notice of Commissioner and Staff Attendance at FERC/NARUC Collaborative on...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD10-15-000] Smart Grid Update; Notice of Commissioner and Staff Attendance at FERC/NARUC Collaborative on Smart Response Meeting... Commission and/or Commission staff may attend the following meeting: FERC/NARUC Collaborative on Smart...

  16. 75 FR 71123 - Notice of Commissioners and Staff Attendance at FERC/NARUC Collaborative on Smart Response Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioners and Staff Attendance at FERC/NARUC Collaborative on Smart Response Meeting November 12, 2010. The Federal Energy... Commission staff may attend the following meeting: FERC/NARUC Collaborative on Smart Response: Omni Hotel at...

  17. 75 FR 5781 - David Noland; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-04

    ...: //[email protected]net . i. FERC Contact: Any questions on this notice should be addressed to... filings, please go to the Commission's Web site located at http://www.ferc.gov .filing-comments.asp... access the document. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to...

  18. 75 FR 81152 - Interpretation of Protection System Reliability Standard

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... created electronically using word processing software should be filed in native applications or print-to... reh'g & compliance, 117 FERC ] 61,126 (2006), aff'd sub nom. Alcoa, Inc. v. FERC, 564 F.3d 1342 (DC... print-to-PDF format and not in a scanned format, at http://www.ferc.gov/docs-filing/efiling.asp . Mail...

  19. 18 CFR 366.4 - FERC-65, notification of holding company status, FERC-65A, exemption notification, and FERC-65B...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ...), which shall contain the following: The identity of the holding company and of the public utilities and natural gas companies in the holding company system; the identity of service companies, including special-purpose subsidiaries providing non-power goods and services; the identity of all affiliates and...

  20. 18 CFR 366.4 - FERC-65, notification of holding company status, FERC-65A, exemption notification, and FERC-65B...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ...), which shall contain the following: The identity of the holding company and of the public utilities and natural gas companies in the holding company system; the identity of service companies, including special-purpose subsidiaries providing non-power goods and services; the identity of all affiliates and...

  1. 18 CFR 366.4 - FERC-65, notification of holding company status, FERC-65A, exemption notification, and FERC-65B...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ...), which shall contain the following: The identity of the holding company and of the public utilities and natural gas companies in the holding company system; the identity of service companies, including special-purpose subsidiaries providing non-power goods and services; the identity of all affiliates and...

  2. 78 FR 38027 - Wilkesboro Hydroelectric Company, LLC; Wilkesboro Hydropower, LLC; Notice of Application for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-25

    ... viewed or printed on the eLibrary link of Commission's Web site at http://www.ferc.gov/docs-filing... Commission's Web site under http://www.ferc.gov/docs-filing/efiling.asp . Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc...

  3. 75 FR 49914 - Commission Information Collection Activities (FERC-511 and FERC-515); Comment Request; Extensions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-16

    ... information. \\5\\ Estimated number of hours an employee works each year = 2080, estimated average annual cost..., along, from, or in any of the streams or other bodies of water over which Congress has jurisdiction... water or water power from any Government dam. FERC-515: The information collected under the requirements...

  4. 18 CFR 357.4 - FERC Form No. 6-Q, Quarterly report of oil pipeline companies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false FERC Form No. 6-Q... No. 6-Q, Quarterly report of oil pipeline companies. (a) Prescription. The quarterly financial report form of oil pipeline companies, designated as FERC Form No. 6-Q, is prescribed for the reporting...

  5. 18 CFR 357.4 - FERC Form No. 6-Q, Quarterly report of oil pipeline companies.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false FERC Form No. 6-Q... No. 6-Q, Quarterly report of oil pipeline companies. (a) Prescription. The quarterly financial report form of oil pipeline companies, designated as FERC Form No. 6-Q, is prescribed for the reporting...

  6. 18 CFR 357.4 - FERC Form No. 6-Q, Quarterly report of oil pipeline companies.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false FERC Form No. 6-Q... No. 6-Q, Quarterly report of oil pipeline companies. (a) Prescription. The quarterly financial report form of oil pipeline companies, designated as FERC Form No. 6-Q, is prescribed for the reporting...

  7. 18 CFR 357.4 - FERC Form No. 6-Q, Quarterly report of oil pipeline companies.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false FERC Form No. 6-Q... No. 6-Q, Quarterly report of oil pipeline companies. (a) Prescription. The quarterly financial report form of oil pipeline companies, designated as FERC Form No. 6-Q, is prescribed for the reporting...

  8. 18 CFR 357.4 - FERC Form No. 6-Q, Quarterly report of oil pipeline companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false FERC Form No. 6-Q... No. 6-Q, Quarterly report of oil pipeline companies. (a) Prescription. The quarterly financial report form of oil pipeline companies, designated as FERC Form No. 6-Q, is prescribed for the reporting...

  9. Legislation Seeks to Protect Power Grid From Space Weather

    NASA Astrophysics Data System (ADS)

    Tretkoff, Ernie

    2010-05-01

    Proposed legislation would help protect the U.S. power grid against space weather and other threats. The Grid Reliability and Infrastructure Defense Act (GRID Act) would give the Federal Energy Regulatory Commission (FERC) authority to develop and enforce standards for power companies to protect the electric grid from geomagnetic storms and threats such as a terrorist attack using electromagnetic pulse (EMP) weapons. The act unanimously passed the U.S. House Committee on Energy and Commerce in April and will proceed to a vote in the full House of Representatives.

  10. 75 FR 10241 - Town of Dexter; Notice of Declaration of Intention and Soliciting Comments, Protests, and/or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ..., ME 04930; telephone: (207) 924-0180; e-mail: http: //[email protected]net . i. FERC Contact... site at http://www.ferc.gov .filing- comments.asp. Please include the docket number (DI10-7-000) on any... document. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified...

  11. 75 FR 67959 - Wagon Wheel Associates; Notice of Application Tendered for Filing With the Commission, Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-04

    ....5 Goose Creek Road, South Fork, CO 81154; (970) 925-6071; [email protected]net . j. FERC Contact...). Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new... on the Commission's Web site ( http://www.ferc.gov/docs-filing/ferconline.asp ) under the ``e- Filing...

  12. 30 CFR 585.618 - What must I do upon completion of approved site assessment activities?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... assessment term, you timely submit a COP meeting the requirements of this subpart, or a complete FERC license... facilities in place on your lease during the time that BOEM reviews your COP for approval or FERC reviews... for facilities that are authorized to remain in place under your approved COP or approved FERC license...

  13. 30 CFR 585.618 - What must I do upon completion of approved site assessment activities?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... assessment term, you timely submit a COP meeting the requirements of this subpart, or a complete FERC license... facilities in place on your lease during the time that BOEM reviews your COP for approval or FERC reviews... for facilities that are authorized to remain in place under your approved COP or approved FERC license...

  14. 30 CFR 585.618 - What must I do upon completion of approved site assessment activities?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... assessment term, you timely submit a COP meeting the requirements of this subpart, or a complete FERC license... facilities in place on your lease during the time that BOEM reviews your COP for approval or FERC reviews... for facilities that are authorized to remain in place under your approved COP or approved FERC license...

  15. 77 FR 7526 - Interpretation of Protection System Reliability Standard

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-13

    ... reh'g & compliance, 117 FERC ] 61,126 (2006), aff'd sub nom. Alcoa, Inc. v. FERC, 564 F.3d 1342 (D.C... opportunity to view and/or print the contents of this document via the Internet through FERC's Home Page... available on eLibrary in PDF and Microsoft Word format for viewing, printing, and/or downloading. To access...

  16. 76 FR 58101 - Electric Reliability Organization Interpretation of Transmission Operations Reliability Standard

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-20

    ... on reh'g & compliance, 117 FERC ] 61,126 (2006), aff'd sub nom. Alcoa, Inc. v. FERC, 564 F.3d 1342 (D... persons an opportunity to view and/or print the contents of this document via the Internet through FERC's... document is available on eLibrary in PDF and Microsoft Word format for viewing, printing, and/or...

  17. 77 FR 27767 - Milford Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... Contact: Bryan Roden-Reynolds at (202) 502-6618, or via email at bryan.roden-reynolds@ferc.gov . Deadline... site at http://www.ferc.gov/docs-filing/elibrary.asp . Enter the docket number (P-14218) in the docket number field to access the document. For assistance, contact FERC Online Support. Dated: May 4, 2012...

  18. 75 FR 61455 - Commission Information Collection Activities (FERC-582); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-05

    ... electronically, access the Commission's website and click on Documents & Filing, E-Filing ( http://www.ferc.gov... and power marketers then must pay the charges within 45 days of the Commission's issuance of the bill... a waiver or exemption of the obligation to pay a fee or an annual charge. Public Comment and FERC...

  19. 18 CFR 131.80 - FERC Form No. 556, Certification of qualifying facility status for an existing or a proposed...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false FERC Form No. 556... COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, FEDERAL POWER ACT AND PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 FORMS § 131.80 FERC Form No. 556, Certification of qualifying facility status for an existing...

  20. 78 FR 14528 - Mayo Hydropower, LLC, Avalon Hydropower, LLC; Notice of Application for Transfer of License, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-06

    ... this project can be viewed or printed on the eLibrary link of Commission's Web site at http://www.ferc...) and the instructions on the Commission's Web site under http://www.ferc.gov/docs-filing/efiling.asp... system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your name and contact...

  1. 78 FR 78349 - Andrew Peklo III; Notice of Availability of Draft Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... draft EA may also be viewed on the Commission's Web site at http://www.ferc.gov using the ``eLibrary... CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/docs... registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your...

  2. 78 FR 60271 - Hollow Dam Power Company; Ampersand Hollow Dam Hydro, LLC; Notice of Application for Transfer of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-01

    ...Library link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp . Enter the docket...) and the instructions on the Commission's Web site under http://www.ferc.gov/docs-filing/efiling.asp... system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your name and contact...

  3. 78 FR 25432 - Sabine Pass LNG, L.P., Sabine Pass Liquefaction, LLC; Notice of Availability of the Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-01

    ... Affairs, at (866) 208-FERC, or on the FERC Web site ( www.ferc.gov ) using the eLibrary link. Click on the... heavies removal column, a heavies removal column reboiler, a debutanizer system, and a condensate stabilizer system to be located inside the battery limits within each of the four liquefaction trains; two...

  4. 76 FR 12958 - Amnor Hydro West Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-09

    ... http:[sol][sol]www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http:[sol][sol]www.ferc.gov/docs-filing...Library'' link of Commission's Web site at http:[sol][sol]www.ferc.gov/docs-filing/ elibrary.asp. Enter...

  5. 30 CFR 285.638 - What must I do upon completion of my commercial operations as approved in my COP or FERC license?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... operations as approved in my COP or FERC license? 285.638 Section 285.638 Mineral Resources MINERALS... FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information Requirements Activities Under An Approved Cop § 285.638 What must I do upon completion of my commercial operations as approved in my COP or FERC...

  6. 75 FR 43965 - Texas Eastern Transmission, LP; Algonquin Gas Transmission, LLC; Notice of Intent To Prepare an...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-27

    ... prepared by the FERC entitled ``An Interstate Natural Gas Facility on My Land? What Do I Need To Know?'' is available for viewing on the FERC Web site ( http://www.ferc.gov ). This fact sheet addresses a number of... metering and regulating (M&R) station in the Borough of Staten Island, New York; Construction of...

  7. 77 FR 277 - Sabine Pass Liquefaction, LLC and Sabine Pass LNG, L.P; Notice of Availability of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-04

    ... Web site ( www.ferc.gov ) using the eLibrary link. A limited number of copies of the EA are available..., or on the FERC Web site ( www.ferc.gov ) using the eLibrary link. Click on the eLibrary link, click... systems, induced draft air coolers, fire and gas detection and safety systems, control systems, and...

  8. 78 FR 934 - 37 Wilton Road, Milford LLC, and 282 Route 101 LLC, PVM Commercial Center, LLC; Notice of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ... printed on the eLibrary link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp... Commission's Web site under http://www.ferc.gov/docs-filing/efiling.asp . Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc...

  9. 77 FR 21761 - Alice Falls Corporation, Alice Falls Hydro, LLC; Notice of Application for Transfer of License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-11

    ... under http:[sol][sol]www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http:[sol][sol]www.ferc.gov... printed on the eLibrary link of Commission's Web site at http:[sol][sol]www.ferc.gov/docs-filing/elibrary...

  10. 76 FR 72699 - KC Hydro LLC of New Hampshire; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-25

    ....2001(a)(1)(iii) and the instructions on the Commission's Web site http:[sol][sol]www.ferc.gov/docs... registration, using the eComment system at http:[sol][sol]www.ferc.gov/docs-filing/ecomment.asp. You must... http:[sol][sol]www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P-14248-000) in the...

  11. Federal Energy Regulatory Commission financial statements, September 30, 1995 and 1994

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1996-02-12

    The attached report presents the results of the independent certified public accountant`s audit of the Federal Energy Regulatory Commission`s (FERC) financial statements as of September 30, 1995 and 1994. The auditors have expressed an unqualified opinion on the 1995 statements. Their reports on FERC`s internal control structure and on compliance with laws and regulations, and management letter are also provided.

  12. Regulation of hydropower: Who is in charge?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Molm, J.

    1995-12-31

    The regulatory, legislative and judicial branches of government all have played a role in twisting and changing FERC`s authority over hydropower. At times authority over hydropower is kept at FERC; at other times it is granted to state or federal agencies. At present, decisions are driven by competing uses of water that require differing flows or quantities of water. It is the highest and best use of the f lows and the quantities that will dictate whether water quantities are used for hydropower or fish habitat. However, that is not where it all started. In First Iowa, the Federal Powermore » Commission ({open_quotes}FPC{close_quotes}) (predecessor to FERC) dismissed a license application solely on the ground of the failure of the license applicant to comply with Iowa statutes. Iowa law provided that no dam could be constructed or operated unless a permit had been issued by a state agency. The U.S. Supreme Court reversed the Commission deciding that the Iowa statute would vest in an Iowa agency a veto power over a federal project and thereby subordinate the FPC`s comprehensive planning obligation to state control. The Court ruled that there is a separation of those subjects that are under the jurisdiction of the states from those subjects that the Constitution delegates to the United States and over which Congress vests the FPC with authority to act. The Court stated that this {open_quotes}duality does not require two agencies to share in the final decision of the same issue.{close_quotes} Although the Supreme Court ruled that federal jurisdiction is preeminent, it should be underscored that it was the FPC`s decision to defer to state authority in the first place. The Supreme Court decision is a determinations that flows for hydropower purposes should be made by the FPC under authority of the Federal Power Act.« less

  13. 30 CFR 285.638 - What must I do upon completion of my commercial operations as approved in my COP or FERC license?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... operations as approved in my COP or FERC license? 285.638 Section 285.638 Mineral Resources BUREAU OF OCEAN... Activities Under An Approved Cop § 285.638 What must I do upon completion of my commercial operations as approved in my COP or FERC license? (a) Upon completion of your approved activities under your COP, you...

  14. 30 CFR 585.638 - What must I do upon completion of my commercial operations as approved in my COP or FERC license?

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... operations as approved in my COP or FERC license? 585.638 Section 585.638 Mineral Resources BUREAU OF OCEAN... FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information Requirements Activities Under An Approved Cop § 585.638 What must I do upon completion of my commercial operations as approved in my COP or FERC...

  15. 30 CFR 585.638 - What must I do upon completion of my commercial operations as approved in my COP or FERC license?

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... operations as approved in my COP or FERC license? 585.638 Section 585.638 Mineral Resources BUREAU OF OCEAN... FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information Requirements Activities Under An Approved Cop § 585.638 What must I do upon completion of my commercial operations as approved in my COP or FERC...

  16. 30 CFR 585.638 - What must I do upon completion of my commercial operations as approved in my COP or FERC license?

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... operations as approved in my COP or FERC license? 585.638 Section 585.638 Mineral Resources BUREAU OF OCEAN... FACILITIES ON THE OUTER CONTINENTAL SHELF Plans and Information Requirements Activities Under An Approved Cop § 585.638 What must I do upon completion of my commercial operations as approved in my COP or FERC...

  17. 75 FR 14438 - PPL Montana, LLC; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-25

    ..., 68 FR 49,846 (Aug. 19, 2003), FERC Stats. & Regs ] 31,146 (2003) (Order No. 2003); order on reh'g, Order No. 2003-A, 69 FR 15,932 (Mar. 26, 2004), FERC Stats. & Regs. 31,160, at P 531 (2004) (Order No. 2003-A); order on reh'g, Order No. 2003-B, 70 FR 265 (Jan. 4, 2005) (Order No. 2003-B) FERC Stats...

  18. Regulatory Policy and Markets for Energy Storage in North America

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kintner-Meyer, Michael CW

    2014-05-14

    The last 5 years have been one of the most exciting times for the energy storage industry. We have seen significant advancements in the regulatory process to make accommodations for valuing and monetizing energy storage for what it provides to the grid. The most impactful regulatory decision for the energy storage industry has come from California, where the California Public Utilities Commission issued a decision that mandates procurement requirements of 1.325 GW for energy storage to 3 investor-own utilities in 4 stages: in 2014, 2016, 2018, and 2020. Furthermore, at the Federal level, FERC’s Order 755, requires the transmission operatorsmore » to develop pay for performance tariffs for ancillary services. This has had direct impact on the market design of US competitive wholesale markets and the monetization of fast responding grid assets. While this order is technology neutral, it clearly plays into the fast-responding capability of energy storage technologies. Today PJM, CAISO, MISO, NYISO, and NE-ISO have implemented Order 755 and offer new tariff for regulation services based on pay-for-performance principles. Furthermore, FERC Order 784, issued in July 2013 requires transmission providers to consider speed and accuracy in determining the requirements for ancillary services. In November 2013, FERC issued Order 972, which revises the small generator interconnection agreement which declares energy storage as a power source. This order puts energy storage on par with existing generators. This paper will discuss the implementation of FERC’s Pay for Performance Regulation order at all ISOs in the U.S. under FERC regulatory authority (this excludes ERCOT). Also discussed will be the market impacts and overall impacts on the NERC regulation performance indexes. The paper will end with a discussion on the California and Ontario, Canada procurement mandates and the opportunity that it may present to the energy storage industry.« less

  19. Optimizing Aggregation Scenarios for Integrating Renewable Energy into the U.S. Electric Grid

    NASA Astrophysics Data System (ADS)

    Corcoran, B. A.; Jacobson, M. Z.

    2010-12-01

    This study is an analysis of 2006 and 2007 electric load data, wind speed and solar irradiance data, and existing hydroelectric, geothermal, and other power plant data to quantify benefits of aggregating clean electric power from various Federal Energy Regulatory Commission (FERC) regions in the contiguous United States. First, various time series, statistics, and probability methods are applied to the electric load data to determine if there are any desirable demand-side results—specifically reducing variability and/or coincidence of peak events, which could reduce the amount of required carbon-based generators—in combining the electricity demands from geographically and temporally diverse areas. Second, an optimization algorithm is applied to determine the least-cost portfolio of energy resources to meet the electric load for a range of renewable portfolio standards (RPS’s) for each FERC region and for various aggregation scenarios. Finally, the installed capacities, ramp rates, standard deviation, and corresponding generator requirements from these optimization test runs are compared against the transmission requirements to determine the most economical organizational structure of the contiguous U.S. electric grid. Ideally, results from this study will help to justify and identify a possible structure of a federal RPS and offer insight into how to best organize regions for transmission planning.

  20. A synthesis of environmental and recreational mitigation requirements at hydropower projects in the United States

    DOE PAGES

    Schramm, Michael P.; Bevelhimer, Mark S.; DeRolph, Chris R.

    2016-04-11

    Environmental mitigation plays an important role in the environmentally sustainable development of hydropower resources. However, comprehensive data on mitigation required by the Federal Energy Regulatory Commission (FERC) at United States (US) hydropower projects is lacking. Therefore, our objective was to create a comprehensive database of mitigation required at non-federal hydropower projects and provide a synthesis of available mitigation data. Mitigation data was collated for over 300 plants licensed or relicensed from 1998 through 2013. We observed that the majority of FERC mitigation requirements deal with either hydrologic flows or recreation and that hydropower plants in the Pacific Northwest had themore » highest number of requirements. Our data indicate opportunities exist to further explore hydropower mitigation in the areas of environmental flows, fish passage, and water quality. Lastly, connecting these data with ecological outcomes, actual flow data, and larger landscape level information will be necessary to evaluate the effectiveness of mitigation and ultimately inform regulators, managers, and planners.« less

  1. A synthesis of environmental and recreational mitigation requirements at hydropower projects in the United States

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schramm, Michael P.; Bevelhimer, Mark S.; DeRolph, Chris R.

    Environmental mitigation plays an important role in the environmentally sustainable development of hydropower resources. However, comprehensive data on mitigation required by the Federal Energy Regulatory Commission (FERC) at United States (US) hydropower projects is lacking. Therefore, our objective was to create a comprehensive database of mitigation required at non-federal hydropower projects and provide a synthesis of available mitigation data. Mitigation data was collated for over 300 plants licensed or relicensed from 1998 through 2013. We observed that the majority of FERC mitigation requirements deal with either hydrologic flows or recreation and that hydropower plants in the Pacific Northwest had themore » highest number of requirements. Our data indicate opportunities exist to further explore hydropower mitigation in the areas of environmental flows, fish passage, and water quality. Lastly, connecting these data with ecological outcomes, actual flow data, and larger landscape level information will be necessary to evaluate the effectiveness of mitigation and ultimately inform regulators, managers, and planners.« less

  2. Ancillary-service costs for 12 US electric utilities

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kirby, B.; Hirst, E.

    1996-03-01

    Ancillary services are those functions performed by electrical generating, transmission, system-control, and distribution-system equipment and people to support the basic services of generating capacity, energy supply, and power delivery. The Federal Energy Regulatory Commission defined ancillary services as ``those services necessary to support the transmission of electric power from seller to purchaser given the obligations of control areas and transmitting utilities within those control areas to maintain reliable operations of the interconnected transmission system.`` FERC divided these services into three categories: ``actions taken to effect the transaction (such as scheduling and dispatching services) , services that are necessary to maintainmore » the integrity of the transmission system [and] services needed to correct for the effects associated with undertaking a transaction.`` In March 1995, FERC published a proposed rule to ensure open and comparable access to transmission networks throughout the country. The rule defined six ancillary services and developed pro forma tariffs for these services: scheduling and dispatch, load following, system protection, energy imbalance, loss compensation, and reactive power/voltage control.« less

  3. Regional Transmission Planning: A review of practices following FERC Order Nos. 890 and 1000

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eto, Joseph H.; Gallo, Guilia

    Federal Energy Regulatory Commission (FERC) Order Nos. 890 and 10001 established requirements that transmission planning regions must follow in regional transmission planning and allocating the costs of new transmission facilities. Order No. 890, issued in 2007, outlined general requirements for local as well as regional transmission planning practices and procedures. Order No. 1000, issued in 2011, laid out specific requirements for: (1) regional transmission planning; (2) consideration of transmission needs driven by public policy requirements; (3) non-incumbent transmission development; (4) interregional transmission coordination; and (5) cost allocation for transmission facilities that have been selected in a regional transmission plan formore » purposes of cost allocation. This report reviews how these FERC orders are being implemented by the 12 transmission planning regions recognized by FERC.« less

  4. 78 FR 53742 - Commission Information Collection Activities (Ferc-582); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-30

    ... commerce. Respondents (public utilities, power marketers) subject to these annual charges must submit FERC.... Type of Respondents: Public utilities and power marketers. Estimate of Annual Burden: \\8\\ The...

  5. 50 CFR 223.301 - Special rules-marine and anadromous fishes.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... their behalf for the purpose of monitoring and evaluating the Opal Springs Hydroelectric Project (FERC... maintenance of the Opal Springs Hydroelectric Project (FERC Project No. 5891) as administered under a license...

  6. 75 FR 38517 - Environmental Impact Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-02

    ..., FERC, CA, Kilarc-Cow Creek Hydroelectric Project (FERC Project No. 606) Proposes to Surrender the License for Operation Project, Old Crow Creek and South Cow Creek, Shasta County, CA, Comment Period Ends...

  7. ACHP | News

    Science.gov Websites

    Chairman of FERC in reaching his final decision on the project. The Chairman of FERC must take into account these comments and respond to them prior to reaching a decision on the project. Read the ACHP's comments

  8. Hydropower into the mainstream: A view from the Potomac

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Clarke, D.H.

    1992-04-01

    This article discusses the regulatory and political environment in Washington, D.C. as it affects the hydro power industry, and the actions of the National Hydropower Association in ensuring that regulators, politicians, and federal agencies understand the issues necessary to maintaining hydro power as a mainstream energy source for the U.S. Some of the issues discussed are the Clean Water Act reauthorization, the Endangered Species Act reauthorization, National Energy Strategy legislation, and trends in FERC regulation.

  9. 75 FR 4550 - Black Marlin Pipeline Company; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    ... public accountant (CPA) certification statement for the FERC Form No. 2-A for 2009. Any person desiring...://www.ferc.gov , using the ``eLibrary'' link and is available for review in the Commission's Public...

  10. Two-Phased Approach to Synchronize the FERC-USACE Processes for Authorizing Non-Federal Hydropower Projects

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2016-07-01

    Publication summarizing how the United States Army Corps of Engineers (USACE) and Federal Regulatory Energy Commission (FERC) have developed a two-phased, coordinated approach to regulating non-federal hydropower projects.

  11. 75 FR 16448 - Jordan Limited Partnership; Notice of Application Ready for Environmental Analysis and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-01

    ....O. Box 903, Gatlinburg, Tennessee 37738 (865) 436-0402. i. FERC Contact: Jeffrey Browning, (202) 502-8677 or jeffrey.browning@ferc.gov . j. Deadline for filing comments, recommendations, terms and...

  12. Conducting a FERC environmental assessment: a case study and recommendations from the Terror Lake Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olive, S.W.; Lamb, B.L.

    This paper is an account of the process that evolved during acquisition of the license to operate the Terror Lake hydro-electric power project under the auspices of the Federal Energy Regulatory Commission (FERC). The Terror River is located on Kodiak Island in Alaska. The river is within the Kodiak National Wildlife Refuge; it supports excellent runs of several species of Pacific Salmon which are both commercially important and a prime source of nutrition for the Kodiak brown bear. This paper discusses both the fish and wildlife questions, but concentrates on instream uses and how protection of these uses was decided.more » In this focus the paper explains the FERC process, gives a history of the Terror Lake Project, and, ultimately, makes recommendations for improved management of controversies within the context of FERC licensing procedures. 64 references.« less

  13. Analysis of PURPA and solar energy

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Rice, M.

    The Public Utility Regulatory Policies Act of 1978 (PURPA) is designed to promote energy conservation, the efficient use of utility resources, and equitable rates. PURPA specifically directs the Federal Energy Regulatory Commission (FERC) to encourage small power production from renewable resources (and also cogeneration of electric energy as well as heat) by setting standards under which facilities qualify for interconnection, and guidelines for sales between utilities and independent facilities. The way FERC carries out this mandate may critically affect the development of solar alternatives to electric power production from fossil and nuclear resources. This report comments on proposed FERC regulationsmore » and suggests ways to encourage small power production within the PURPA mandate. In addition, some internal strains within PURPA are analyzed that seem to limit the effectiveness with which FERC can encourage independent facilities, and possible modifications to PURPA are suggested. 255 references.« less

  14. 75 FR 48965 - Ameren Services Company; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-12

    ..., Promoting Transmission Investment Through Pricing Reform, Order No. 679, 2006-2007 FERC Stats. & Regs., Regs. Preambles ] 31,222, order on reh'g, Order No. 679-A, 2006-2007 FERC Stats. & Regs., Regs. Preambles ] 31,236...

  15. 76 FR 54748 - Commission Information Collection Activities (FERC-519); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... . All comments may be viewed, printed or downloaded remotely via the Internet through FERC's homepage using the ``eLibrary'' link. For user assistance, contact [email protected] or toll-free at...

  16. 75 FR 66079 - National Grid USA; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-27

    ... 11013 (Feb. 29, 2008), FERC Stats. & Regs. ] 31,264, at P 4-5, order on rehearing, Order No. 707-A, 73 FR 43072 (Jul. 24, 2008), FERC Stats. & Regs. ] 31,272 (2008). Any person desiring to intervene or to...

  17. 75 FR 34108 - National Grid USA; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-16

    .... 707, 73 FR 11013 (Feb. 29, 2008), FERC Stats. & Regs. ] 31,264, at P 4-5, order on rehearing, Order No. 707-A, 73 FR 43072 (Jul. 24, 2008), FERC Stats. & Regs. ] 31,272 (2008). Any person desiring to...

  18. 75 FR 4057 - Jordan Limited Partnership; Notice of Application Accepted for Filing and Soliciting Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-26

    ....O. Box 903, Gatlinburg, Tennessee 37738 (865) 436-0402. i. FERC Contact: Jeffrey Browning, (202) 502-8677 or jeffrey.browning@ferc.gov . j. Deadline for filing motions to intervene and protests: 60 days...

  19. Negotiating Terms and Conditions: An Overview of the Federal Energy Regulatory Commission Hydropower Settlement Agreement Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Levine, Aaron L; Curtis, Taylor L; Shields, Laura

    The process for obtaining, transferring, or surrendering a Federal Energy Regulatory Commission (FERC) hydropower license or exemption from licensing can be a series of complex negotiations. In many instances, the process may include stakeholders with different and/or competing perspectives or objectives related to the original license, new license (i.e., relicense), transfer of a license, or surrender of a license. Divergent perspectives and objectives can lead to disputes among project participants, which may impact the development of FERC license terms and conditions. One mechanism to resolve disputes between project participants involving a FERC authorization is informal and formal settlement agreement conferences,more » which often result in settlement agreements addressing the disputed issues. This report provides hydropower stakeholders with a better understanding of the FERC settlement agreement process, including information on: How to initiate a settlement agreement. The procedural steps associated with the settlement agreement process. The legal standards the Commission must adhere to when determining whether settlement agreement provisions can become lawful and enforceable terms or conditions of a FERC authorization. Examples of settlement agreement provisions included as license terms and conditions or in off-license agreements from a collection of settlement agreements and Commission orders.« less

  20. 75 FR 27771 - Mississippi 13 Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ..., Idaho 83442; phone: (208) 745-0834. FERC Contact: Bryan Roden-Reynolds at (202) 502-6618, or via e-mail at bryan.roden-reynolds@ferc.gov . The deadline for filing comments, motions to intervene, competing...

  1. 75 FR 27770 - Mississippi 12 Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ..., Rigby, Idaho 83442; phone: (208) 745-0834. FERC Contact: Bryan Roden-Reynolds at (202) 502-6618, or via e-mail at bryan.roden-reynolds@ferc.gov . The deadline for filing comments, motions to intervene...

  2. 75 FR 27770 - Mississippi 17 Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ..., Idaho 83442; phone: (208) 745-0834. FERC Contact: Bryan Roden-Reynolds at (202) 502-6618, or via e-mail at bryan.roden-reynolds@ferc.gov . The deadline for filing comments, motions to intervene, competing...

  3. 75 FR 27769 - Mississippi 16 Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-18

    ..., Idaho 83442; phone: (208) 745-0834. FERC Contact: Bryan Roden-Reynolds at (202) 502-6618, or via e-mail at bryan.roden-reynolds@ferc.gov . The deadline for filing comments, motions to intervene, competing...

  4. 76 FR 57724 - Notice of Application Tendered for Filing With the Commission, Accepted for Filing With the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-16

    ..., Westminster, MA 01473, (978) 874-1010, [email protected] . i. FERC Contact: Jeff Browning, (202) 502-8677, or e-mail at Jeffrey.Browning@ferc.gov . j. Deadline for Filing Motions to Intervene And Protests...

  5. 77 FR 39691 - Commission Information Collection Activities (FERC-725); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-05

    ... information collection FERC-725, Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards, to the Office of Management and Budget (OMB) for review of the information collection..., Certification of Electric Reliability Organization; Procedures for Electric Reliability Standards. OMB Control...

  6. 78 FR 69658 - Domtar Wisconsin Dam Corporation; Notice of Application To Amend License and Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-20

    ... Point Basse Avenue, Nekoosa, Wisconsin 54457; telephone (715) 886-7711. i. FERC Contact: Linda Stewart at (202) 502-6680; or email at linda.stewart@ferc.gov . j. Deadline for filing comments, motions to...

  7. Conducting a FERC environmental assessment: a case study and recommendations from the Terror Lake Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olive, S.W.; Lamb, B.L.

    This paper is an account of the process that evolved during acquisition of the license to operate the Terror Lake hydroelectric power project under the auspices of the Federal Energy Regulatory Commission (FERC). The Commission is responsible for granting these licenses under the Federal Power Act (16 U.S.C. 792 et seq.). This act provides, in part, that FERC may condition a license to protect the public interest. The public interest in these cases has come to include both instream and terrestrial values. The Terror River is located on Kodiak Island in Alaska. The river is within the Kodiak National Wildlifemore » Refuge; it supports excellent runs of several species of Pacific Salmon which are both commercially important and a prime source of nutrition for the Kodiak brown bear. The river is also a prime resource for generating electric power. One major concern in the negotiations was the impact of land disturbance and management practices on brown bear habitat - i.e., protection of the brown bear. Maintenance of the bears' habitat is the main purpose of the Kodiak National Wildlife Refuge. But, like many other projects, resolving the instream flow issue was of major importance in the issuance of the FERC license. This paper discusses the fish and wildlife questions, but concentrates on instream uses and how protection of these uses was decided. With this as a focus, the paper explains the FERC process, gives a history of the Terror Lake Project, and, ultimately, makes recommendations for improved management of controversies within the context of the FERC licensing procedures. 65 references.« less

  8. 76 FR 1153 - Atlantic Grid Operations A LLC, Atlantic Grid Operations B LLC, Atlantic Grid Operations C LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ...\\ Promoting Transmission Investment through Pricing Reform, Order No. 679, 2006-2007 FERC Stats. & Regs., Regs. Preambles ] 31,222, order on reh'g, Order No. 679-A, 2006-2007 FERC Stats. & Regs., Regs. Preambles ] 31,236...

  9. 78 FR 13657 - Commission Information Collection Activities (FERC-577); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-28

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC13-12-000] Commission Information Collection Activities (FERC-577); Comment Request; Extension AGENCY: Federal Energy Regulatory...: In compliance with the requirements of the Paperwork Reduction Act of 1995, the Federal Energy...

  10. 78 FR 45919 - Commission Information Collection Activities (FERC Form 80); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ... Information Collection Activities (FERC Form 80); Comment Request; Extension AGENCY: Federal Energy Regulatory... Office of Information and Regulatory Affairs: [email protected] . Attention: Federal Energy... receiving automatic notification of activity in this docket or in viewing/downloading comments and issuances...

  11. 76 FR 18743 - Commission Information Collection Activities (FERC-603); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-05

    ... FERC-603 ``Critical Energy Infrastructure Information'' (OMB No. 1902-0197) is used by the Commission to implement procedures for gaining access to critical energy infrastructure information (CEII) that... information about ``existing or proposed critical infrastructure that (i) relates to the production...

  12. 78 FR 75559 - Kaukauna Utilities; Notice of Intent To File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-12

    ... Operations, Kaukauna Utilities, 777 Island Street, Kaukauna, WI 54130; phone: (920) 462-0220; email: wi.org ">[email protected] wi.org . i. FERC Contact: Isis Johnson at (202) 502-6346; or email at isis.johnson@ferc.gov...

  13. 78 FR 34373 - Flexible and Local Resources Needed for Reliability in the California Wholesale Electric Market...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-07

    ... form at: https://www.ferc.gov/whats-new/registration/elec-markets-07-31-13-speaker-form.asp . Due to....ferc.gov/whats-new/registration/elec-markets-07-31-13-form.asp . The technical conference will not be...

  14. 76 FR 35870 - Commission Information Collection Activities (FERC-523); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    ..., such as administrative costs and the cost for information technology. Indirect or overhead costs are... other technological collection techniques or other forms of information technology e.g. permitting... Information Collection Activities (FERC-523); Comment Request; Extension AGENCY: Federal Energy Regulatory...

  15. 78 FR 79427 - Greenwood County; Notice of Application Accepted for Filing and Soliciting Comments, Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-30

    ... Commission's Web site at http://www.ferc.gov/docs-filing/efiling.asp . Commenters can submit brief comments... calling (202) 502-8371. This filing may also be viewed on the Commission's Web site at http://www.ferc.gov...

  16. 77 FR 69450 - Notice of FERC Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance Docket... gives notice that on November 16, 2012, members of its staff will attend a meeting conducted by... is open to all stakeholders and Commission staff's attendance is part of the Commission's ongoing...

  17. 77 FR 31342 - Commission Information Collection Activities (FERC-914); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC12-14-000] Commission Information Collection Activities (FERC-914); Comment Request; Extension AGENCY: Federal Energy Regulatory Commission, Department of Energy. ACTION: Notice of information collection and request for comments. SUMMARY...

  18. A not-so-funny thing happened on the way to relicensing the Edwards Dam

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ayer, F.J.; Isaacson, M.

    1995-12-31

    What started out as a seemingly straightforward and simple exercise, obtaining a new FERC license for the Edwards Dam in Augusta, Maine, turned out to be anything but straightforward and far from simple. This article tells the story of one of the more interesting and possibly precedent setting cases in the {open_quotes}class of 93{close_quotes} and is presented in three sections: (1) the history of the Edwards Dam and the FERC regulatory process through the spring of 1995; (2) Edwards` response to the dam removal campaign; and (3) recommendations for FERC licensees threatened by dam removal during relicensing.

  19. 75 FR 18203 - Desert Southwest Power, LLC; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... Reform, Order No. 679, 71 FR 43294 (July 31, 2006), FERC Stats. & Regs. ] 31,222 (2006), order on reh'g, Order No. 679-A, 72 FR 1152 (Jan. 10, 2007), FERC Stats. & Regs. ] 31,236 (2006), order on reh'g, 119...

  20. 76 FR 22691 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-22

    ... Power V, LLC, First Wind Energy Marketing, LLC, Milford Wind Corridor Phase I, LLC, Milford Wind...-certification [or self-recertification] listed above, do not institute a proceeding regarding qualifying... lieu of paper, using the FERC Online links at http://www.ferc.gov . To facilitate electronic service...

  1. 76 FR 46791 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ... Trading and Marketing, LLC, Duke Energy Vermillion II, LLC, Duke Energy Washington II, LLC, Happy Jack...] listed above, do not institute a proceeding regarding qualifying facility status. A notice of self... the FERC Online links at http://www.ferc.gov . To facilitate electronic service, persons with Internet...

  2. 75 FR 61742 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ...- 1255-004. Applicants: ArcLight Energy Marketing, LLC, Oak Creek Wind Power, LLC, Coso Geothermal Power...] listed above, do not institute a proceeding regarding qualifying facility status. A notice of self... the FERC Online links at http://www.ferc.gov . To facilitate electronic service, persons with Internet...

  3. 76 FR 17409 - Combined Notice of Filings #

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ... Energy Marketing Company Description: Ameren Energy Marketing Company submits tariff filing per 35.13(a... of self-certification [or self-recertification] listed above, do not institute a proceeding regarding... interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov . To facilitate electronic...

  4. 76 FR 19347 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-07

    ...: Notice of Cancellation of Interchange Agreement with LG&E Energy Marketing by Florida Power Corporation...-recertification] listed above, do not institute a proceeding regarding qualifying facility status. A notice of... the FERC Online links at http://www.ferc.gov . To facilitate electronic service, persons with Internet...

  5. 78 FR 58296 - Commission Information Collection Activities (FERC-604); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... collection requirements with no changes to the reporting requirements. Abstract: Cash management or ``money... unregulated) pools of money in cash management programs could detrimentally affect regulated rates. To protect... submitting the information collection FERC-604 (Cash Management Agreements) to the Office of Management and...

  6. 76 FR 44902 - FFP Project 90, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-27

    ... Contact: Bryan Roden-Reynolds at (202) 502-6618, or via e-mail at bryan.roden-reynolds@ferc.gov . Deadline... http://www.ferc.gov/docs-filing/elibrary.asp . Enter the docket number (P-14218) in the docket number...

  7. 77 FR 70746 - Commission Information Collection Activities (FERC-592); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-27

    ... information collection, Standards of Conduct for Transmission Provider; and Marketing Affiliates of Interstate... transportation information, which allows them to compete with marketing affiliates on a more equal basis. 18 CFR... Information Collection Activities (FERC-592); Comment Request; Extension AGENCY: Federal Energy Regulatory...

  8. 77 FR 97 - Commission Information Collection Activities, Proposed Collection (FERC-598); Comment Request...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... requirements; (4) training personnel to respond to a collection of information; (5) searching data sources; (6... Information Collection Activities, Proposed Collection (FERC-598); Comment Request; Extension AGENCY: Federal Energy Regulatory Commission. ACTION: Notice of Proposed Information Collection and Request for Comments...

  9. 75 FR 8691 - Combined Notice of Filings # 3

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-25

    ..., 2010. Take notice that the Commission received the following electric rate filings: Docket Numbers.... Applicants: Xcel Energy Services Inc. Description: Northern States Power Company et al submits Original Sheet 1 et al to FERC Electric Tariff, Original Volume 3--FERC Electric Rate Schedule 280-NSP. Filed Date...

  10. 77 FR 28595 - Vlast LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ... the FERC Online links at http://www.ferc.gov . To facilitate electronic service, persons with Internet access who will eFile a document and/or be listed as a contact for an intervenor must create and validate...

  11. 77 FR 12832 - Non-RTO/ISO Performance Metrics; Commission Staff Request Comments on Performance Metrics for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-02

    ...- peak hours; and (4) additional information on equipment types affected and kV of lines affected. Items... Regulatory Commission (Commission or FERC), among other actions, work with regional transmission... Average burden FERC-922 requirements respondents responses per hours per Total annual annually respondent...

  12. 76 FR 19986 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-11

    ...: ER10-2614-004. Applicants: ENMAX Energy Marketing, Inc. Description: ENMAX Energy Marketing Inc... filings, the notices of self-certification [or self-recertification] listed above, do not institute a... submission of protests and interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov...

  13. 76 FR 46789 - Combined Notice of Filings #2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ... Jersey Solar, LLC, PPL Renewable Energy, LLC, PPL EnergyPlus, LLC, LG&E Energy Marketing, Inc... of self-certification [or self-recertification] listed above, do not institute a proceeding regarding... interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov . To facilitate electronic...

  14. 75 FR 61712 - Combined Notice of Filings # 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    ...- 1255-004. Applicants: ArcLight Energy Marketing, LLC, Oak Creek Wind Power, LLC, Coso Geothermal Power... of self-certification [or self-recertification] listed above, do not institute a proceeding regarding... interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov . To facilitate electronic...

  15. 78 FR 16843 - Commission Information Collection Activities; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-19

    ... Section 219 \\1\\ of the Federal Power Act, the Commission issued FERC Order No. 679 \\2\\, Promoting Transmission Investment Through Pricing Reform. In Order No. 679 FERC amended its regulations in 18 CFR 35.35... consumers by ensuring reliability and to reduce the cost of delivered power by reducing transmission...

  16. 78 FR 34091 - Sierrita Gas Pipeline LLC; Notice of Public Meeting for the Proposed Sierrita Pipeline Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... Sierrita Pipeline Project right-of-way. The meeting is open to the public; however, the intent of the..., or on the FERC Web site at www.ferc.gov using the ``eLibrary'' link. Click on the eLibrary link...

  17. 77 FR 16214 - Commission Information Collection Activities (FERC-598); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ... Generator or Foreign Utility Company Status, to the Office of Management and Budget (OMB) for review of the...., Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission...: Title: FERC-598, Self Certification for Entities Seeking Exempt Wholesale Generator or Foreign Utility...

  18. 77 FR 13121 - Solar Energy Industries Association: Notice of Petition for Rulemaking

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-05

    ... its small generator interconnection rules and procedures \\1\\ for solar electric generation. \\1\\ Standardization of Small Generator Interconnection Agreements and Procedures, Order No. 2006, FERC Stats. & Regs... First Street NE., Washington, DC 20426. This filing is accessible on-line at http://www.ferc.gov , using...

  19. 18 CFR 131.31 - FERC Form No. 561, Annual report of interlocking positions.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, FEDERAL POWER ACT AND PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 FORMS § 131.31 FERC Form No. 561, Annual report of interlocking... the Federal Energy Regulatory Commission's staff for the review and oversight of interlocking...

  20. 18 CFR 131.31 - FERC Form No. 561, Annual report of interlocking positions.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, FEDERAL POWER ACT AND PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 FORMS § 131.31 FERC Form No. 561, Annual report of interlocking... the Federal Energy Regulatory Commission's staff for the review and oversight of interlocking...

  1. 18 CFR 131.31 - FERC Form No. 561, Annual report of interlocking positions.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, FEDERAL POWER ACT AND PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 FORMS § 131.31 FERC Form No. 561, Annual report of interlocking... the Federal Energy Regulatory Commission's staff for the review and oversight of interlocking...

  2. 18 CFR 131.31 - FERC Form No. 561, Annual report of interlocking positions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, FEDERAL POWER ACT AND PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 FORMS § 131.31 FERC Form No. 561, Annual report of interlocking... the Federal Energy Regulatory Commission's staff for the review and oversight of interlocking...

  3. 76 FR 66707 - Commission Information Collection Activities (FERC-1 and FERC-1F); Comment Request; Submitted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-27

    ... provided by the Commission's chart of accounts and related accounting instructions permits comparability... accounting records using dissimilar accounting methods and classifications to record similar transactions and... information. The estimate of cost for respondents is based upon salaries for professional and clerical support...

  4. 78 FR 16485 - Commission Information Collection Activities (FERC-607); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... submitting the information collection, FERC-607 (Report on Decision or Action on Request for Federal... and is making this notation in its submittal to OMB. DATES: Comments on the collection of information....gov . Attention: Federal Energy Regulatory Commission Desk Officer. The Desk Officer may also be...

  5. 78 FR 54880 - Commission Information Collection Activities (FERC-551); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... making this notation in its submittal to OMB. DATES: Comments on the collection of information are due by... . Attention: Federal Energy Regulatory Commission Desk Officer. The Desk Officer may also be reached via...: Three-year extension of the FERC-551 information collection requirements with no changes to the...

  6. 76 FR 62804 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Work Group and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State Committee Work Group and Stakeholder Meeting The Federal Energy Regulatory... is part of the Commission's ongoing outreach efforts. Entergy Regional State Committee Work Group and...

  7. 77 FR 71186 - Commission Information Collection Activities (FERC-912); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-29

    ... submitting the information collection FERC-912, Cogeneration and Small Power Production, PURPA Section 210(m... Production, PURPA Section 210(m) Regulations for Termination or Reinstatement of Obligation to Purchase or... Section 210 of the Public Utility Regulatory Policies Act of 1978 (PURPA) by adding subsection ``(m...

  8. 78 FR 16487 - Commission Information Collection Activities (FERC-556); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... Policies Act of 1978 (PURPA).\\1\\ FERC is authorized to encourage cogeneration and small power production... power production facilities which use other wastes and renewable resources. PURPA, encourages the... order to obtain qualifying status; the PURPA benefits which are available to QFs to encourage small...

  9. 77 FR 77067 - Commission Information Collection Activities (FERC Form No. 556); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ... Regulatory Policies Act of 1978 (PURPA).\\1\\ FERC is authorized to encourage cogeneration and small power... power production facilities which use other wastes and renewable resources. PURPA, encourages the... order to obtain qualifying status; The PURPA benefits which are available to QFs to encourage small...

  10. 78 FR 55249 - Transmission Relay Loadability Reliability Standard; Notice of Compliance Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ...; RM11-16-000] Transmission Relay Loadability Reliability Standard; Notice of Compliance Filing Take.... \\1\\ Transmission Relay Loadability Reliability Standard, Order No. 733, 130 FERC ] 61, 221 (2010..., Order No. 733-B, 136 FERC ] 61,185 (2011). \\2\\ Transmission Relay Loadability Reliability Standard, 138...

  11. 77 FR 64495 - Commission Information Collection Activities (FERC-922); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-22

    ... submitting the new information collection FERC-922, ``Performance Metrics in Regions Outside ISOs and RTOs... RTOs. OMB Control No.: To be determined. Type of Request: Approval of a new information collection. Abstract: The collection of information requires those public utilities outside of ISOs and RTOs that...

  12. 76 FR 64340 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-18

    ... that the Commission received the following electric rate filings: Docket Numbers: ER11-4042-001...: FERC Electric Rate Schedule No. 43--SFA Compliance Filing to be effective 9/28/2011. Filed Date: 10/05... Power, LLC submits tariff filing per 35: Columbia Utilities Power FERC Electric Tariff to be effective 9...

  13. 77 FR 53877 - Commission Information Collection Activities (FERC-715); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ...; A detailed description of the transmission planning reliability criteria used to evaluate system... reliability criteria are applied and the steps taken in performing transmission planning studies); and A... reliability criteria using its stated assessment practices. The FERC-715 enables the Commission to use the...

  14. 75 FR 51027 - Commission Information Collection Activities (FERC-917 and FERC-918) 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... public utilities, working through the North American Electric Reliability Corporation (NERC), to develop... required a NERC/NAESB \\3\\ team to draft and review Order No. 890 reliability standards and business... revise reliability standards to require the exchange of data and coordination among transmission...

  15. 75 FR 38798 - Commission Information Collection Activities (FERC Form No. 580) Request; Submitted for OMB...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ..., Office of the Deputy Chief Information Officer, Federal Energy Regulatory Commission, 888 First Street... Information Collection Activities (FERC Form No. 580) Request; Submitted for OMB Review; Correction June 29... submission of information collection to the Office of Management and Budget for review of information...

  16. 76 FR 18209 - Commission Information Collection Activities (FERC-725D); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-01

    ... by the FERC-725D, ``Facilities Design, Connections and Maintenance Reliability Standards'' (OMB... 2005 added a new section 215 to the FPA, which required a Commission-certified Electric Reliability Organization (ERO) to develop mandatory and enforceable reliability standards, which are subject to Commission...

  17. 78 FR 63172 - Commission Information Collection Activities (FERC-733); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-23

    ... Electric Reliability Corporation (NERC) and EIA, to fielding and collecting data using a FERC designed... Commission in time to complete the 2014 report to Congress. NERC, as the Electric Reliability Organization... dispatchable and non-dispatchable resources that it needs to conduct its reliability work. Reporting demand...

  18. 78 FR 34093 - California Independent System Operator Corporation; Notice of FERC Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-06

    ... Independent System Operator Corporation; Notice of FERC Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that on the following date members of its staff will participate... teleconferences and meetings are open to all market participants and staff's attendance is part of the Commission...

  19. 77 FR 41402 - California Independent System Operator Corporation; Notice of FERC Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-07-13

    ...] California Independent System Operator Corporation; Notice of FERC Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that on the following date members of its staff will... by the CAISO, the teleconferences and meetings are open to all market participants and staff's...

  20. 76 FR 76157 - California Independent System, Operator Corporation; Notice of FERC Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-12-06

    ..., Operator Corporation; Notice of FERC Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that on the following dates members of its staff will participate in teleconferences... teleconferences and meetings are open to all market participants, and staff's attendance is part of the Commission...

  1. 77 FR 58829 - Notice of FERC Staff Attendance at Entergy/Cleco Teleconference on Order No. 1000

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-24

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at Entergy/Cleco Teleconference on Order No. 1000 The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of its staff may participate in the teleconference noted below. Their...

  2. 77 FR 50683 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-22

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State Committee Meeting The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of its staff may attend the meeting noted below. Their attendance is part of...

  3. 76 FR 65191 - California Independent System Operator Corporation; Notice of FERC Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-20

    ...; Notice of FERC Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that on the following dates members of its staff will participate in teleconferences and meetings to be... staff's attendance is part of the Commission's ongoing outreach efforts. The teleconferences and...

  4. 78 FR 11868 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-20

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State Committee Meeting The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of its staff may attend the meeting noted below. Their attendance is part of...

  5. 78 FR 11167 - Commission Information Collection Activities (FERC-592); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-15

    ... Marketing Affiliates of Interstate Pipelines), to the Office of Management and Budget (OMB) for review of... user assistance contact FERC Online Support by email at [email protected] , or by phone at...; and Marketing Affiliates of Interstate Pipelines). OMB Control No.: 1902-0157. Type of Request: Three...

  6. 75 FR 22394 - Combined Notice of Filings No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-28

    ... Marketing LLC. Description: Fulcrum Power marketing, LLC submits letter requesting a determination by the... encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links... FERC Online service, please e-mail [email protected] . or call (866) 208-3676 (toll free). For...

  7. 76 FR 54749 - Commission Information Collection Activities (FERC-523); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IC11-523-001] Commission Information Collection Activities (FERC-523); Comment Request; Submitted for OMB Review AGENCY: Federal Energy Regulatory Commission, Energy. ACTION: Notice. SUMMARY: In compliance with the requirements of section 3507...

  8. 78 FR 49490 - Commission Information Collection Activities (Ferc-511); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-14

    ... information collection, FERC-511 (Transfer of Electric License). DATES: Comments on the collection of...-0873. SUPPLEMENTARY INFORMATION: Title: Transfer of Electric License. OMB Control No.: 1902-0069... utilization of power.\\2\\ Section 8 of the FPA provides that the voluntary transfer of any license is made only...

  9. 78 FR 69843 - Commission Information Collection Activities (Ferc-Ferc-549d); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-21

    ... materials in the Federal Register. Type of Respondents: Intrastate natural gas and Hinshaw pipelines...: Title: Quarterly Transportation and Storage Report for Intrastate Natural Gas and Hinshaw Pipelines. OMB... Report for Intrastate Natural Gas and Hinshaw Pipelines Number of Average burden Estimated Format of...

  10. 78 FR 68833 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-15

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings 1 Take notice... Wallingford--CONVEX Services CL&P Electric Rate Schedule FERC No. 583 to be effective 1/1/2014. Filed Date: 11... Company submits CMEEC--CONVEX Services First Revised Rate Schedule FERC No. 576 to be effective 1/1/2014...

  11. 78 FR 2987 - Sunshine Act Meeting Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    .... For a recorded message listing items struck from or added to the meeting, call (202) 502-8627. This is... D. Bose, Secretary. A free webcast of this event is available through www.ferc.gov . Anyone with Internet access who desires to view this event can do so by navigating to www.ferc.gov 's Calendar of...

  12. 77 FR 98 - Commission Information Collection Activities, Proposed Collection (FERC-716); Comment Request...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-03

    ... requirements of FERC-716 (``Good Faith Request for Transmission Service and Response by Transmitting Utility..., provide standards by which the Commission determines if and when a valid good faith request for... 12 components of a good faith estimate and 5 components of a reply to a good faith request. Action...

  13. 78 FR 55251 - Hydropower Regulatory Efficiency Act of 2013; Notice of Workshop

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-10

    ... Regulatory Efficiency Act of 2013; Notice of Workshop The Federal Energy Regulatory Commission (FERC or... 6 of the Hydropower Regulatory Efficiency Act of 2013. Participants should be prepared to discuss... at https://www.ferc.gov/whats-new/registration/efficiency-act-10-02-13-form.asp by September 25, 2013...

  14. 78 FR 28820 - Commission Information Collection Activities (FERC Form 80); Comment Request; Revision

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Information Collection Activities (FERC Form 80); Comment Request; Revision AGENCY: Federal Energy Regulatory... notification of activity in this docket or in viewing/downloading comments and issuances in this docket may do... the resources that are affected by their activities and to play a role in protecting such resources...

  15. 76 FR 1148 - CRD Hydroelectric LLC, Iowa; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-07

    ... reviewed the application for an original license for the Red Rock Hydroelectric Project (FERC Project No... Engineers' Red Rock Dam. Staff prepared an environmental assessment (EA), which analyzes the potential... the Public Reference Room or may be viewed on the Commission's Web site at http://www.ferc.gov using...

  16. 76 FR 10811 - Annual Charges for Use of Government Lands

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-28

    ... consider in determining the methodology to be used to calculate rental rates for use of government lands...,'' available at http://www.ferc.gov/docs-filing/efiling.asp , or via phone from FERC Online Support at 202-502... fund the Commission's operations. 3. The Commission has employed various methodologies to determine the...

  17. 18 CFR 260.1 - FERC Form No. 2, Annual report for Major natural gas companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... report for Major natural gas companies. 260.1 Section 260.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.1 FERC Form No. 2, Annual report for Major natural gas companies. (a...

  18. 18 CFR 260.401 - FERC Form No. 552, Annual Report of Natural Gas Transactions.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., Annual Report of Natural Gas Transactions. 260.401 Section 260.401 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.401 FERC Form No. 552, Annual Report of Natural Gas Transactions. (a...

  19. 75 FR 44789 - Northern Natural Gas Company; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-29

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP10-841-000] Northern Natural Gas Company; Notice of Technical Conference July 20, 2010. By order dated July 9, 2010 \\1\\ the... discussed in the July 9, 2010 Order. \\1\\ Northern Natural Gas Company, 132 FERC ] 61,021 (2010). FERC...

  20. 75 FR 28798 - Combined Notice of Filings No. 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-24

    ..., 2010. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund.... Description: High Island Offshore System, LLC submits Substitute Ninth Revised Sheet 11 to FERC Gas Tariff..., LP submits Sub First Revised Sheet No 222A et al. to FERC Gas Tariff, Original Volume No. 1, to be...

  1. 75 FR 22397 - Combined Notice of Filings No. 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-28

    ... 19, 2010. Take notice that the Commission has received the following Natural Gas Pipeline Rate and... Substitute Second Revised Sheet 2 et al. to FERC Gas Tariff, Fourth Revised Volume 1, to be effective 4/1/10.... Description: Dauphin Island Gathering Partners submits the Substitute Ninth Revised Sheet No. 7 et al. to FERC...

  2. 75 FR 4367 - Combined Notice of Filings No. 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-27

    ... 14, 2010. Take notice that the Commission has received the following Natural Gas Pipeline Rate and... submits Substitute Original Sheet 739c to FERC Gas Tariff, Sixth Revised Volume 1 to be effective 1/1/10...: Texas Gas Transmission, LLC submits Substitute Second Revised Sheet 4000 to FERC Gas Tariff, Third...

  3. 75 FR 1764 - Combined Notice of Filings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-13

    ...: Rockies Express Pipeline LLC submits Original Sheet No. 11C to FERC Gas Tariff, Second Revised Volume No...: Southern LNG, Inc submits for filing Third Revised Sheet 1 et al. to FERC Gas Tariff, Original Volume 1 to... Gas Tariff, Original Volume 1. Filed Date: 12/30/2009. Accession Number: 20091230-0049. Comment Date...

  4. 77 FR 63301 - Juneau Hydropower, Inc.; Notice of Draft License Application and Preliminary Draft Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-16

    .... 791(a)-825(r). h. Applicant Contact: Duff Mitchell, Business Manager, Juneau Hydropower, Inc., P.O... information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnline... access the document. For assistance, contact FERC Online Support. You may also register online at http...

  5. 78 FR 24402 - Commission Information Collection Activities (FERC Form 80); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-25

    ... Information Collection Activities (FERC Form 80); Comment Request; Extension AGENCY: Federal Energy Regulatory... automatic notification of activity in this docket or in viewing/downloading comments and issuances in this... jurisdiction to recognize the resources that are affected by their activities and to play a role in protecting...

  6. 77 FR 35081 - Sunshine Act Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-12

    ... Nuclear Regulatory Commission (NRC) on Grid Reliability (Public Meeting). To be held at FERC Headquarters... meeting will be webcast live at the Web address--www.ferc.gov. Week of June 18, 2012--Tentative There are... Wertz, 301-415-1568.) This meeting will be webcast live at the Web address--www.nrc.gov. Week of July 16...

  7. 75 FR 47302 - Notice of FERC Attendance at the Entergy Regional State Committee Meeting, Entergy ICT...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-05

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Attendance at the Entergy Regional State Committee Meeting, Entergy ICT Tranmission Planning Summit and Entergy SPP RTO Planning... Orleans, 500 Canal Street, New Orleans, LA 70130, 504-525-2500. Entergy ICT Transmission Planning Summit...

  8. 76 FR 35872 - Commission Information Collection Activities (Ferc-603); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-20

    .... Critical infrastructure means existing and proposed systems and assets, whether physical or virtual, the....ferc.gov/help/submission-guide.asp . To file the document electronically, access the Commission's Web... using the ``eLibrary'' link. For user assistance, contact [email protected] or toll-free at...

  9. 76 FR 61351 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-04

    ... Trading LLC submits tariff filing per 35.1: DB Energy Trading LLC Rate Schedule FERC No. 1 Baseline Filing... Energy FERC Electric Tariff, Volume No. 1 Baseline to be effective 9/23/2011. Filed Date: 09/23/2011... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings 1 Take notice...

  10. 77 FR 28863 - Commission Information Collection Activities (FERC-915); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... under section 205 of the Federal Power Act (FPA) to ensure that wholesale sales of electricity are just... maintained by the respondents under FERC-915 to monitor the entities' sales, ensure that the prices are just and reasonable, maintain the integrity of the wholesale jurisdictional sales markets, and ensure that...

  11. 18 CFR 366.23 - FERC Form No. 60, Annual reports of centralized service companies, and FERC-61, Narrative...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... functions. 366.23 Section 366.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL... or narrative description. (b) Transition period. Service companies in holding company systems...

  12. 18 CFR 366.23 - FERC Form No. 60, Annual reports of centralized service companies, and FERC-61, Narrative...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... functions. 366.23 Section 366.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL... or narrative description. (b) Transition period. Service companies in holding company systems...

  13. 18 CFR 366.23 - FERC Form No. 60, Annual reports of centralized service companies, and FERC-61, Narrative...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... functions. 366.23 Section 366.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL... or narrative description. (b) Transition period. Service companies in holding company systems...

  14. 18 CFR 366.23 - FERC Form No. 60, Annual reports of centralized service companies, and FERC-61, Narrative...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... functions. 366.23 Section 366.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL... or narrative description. (b) Transition period. Service companies in holding company systems...

  15. 18 CFR 366.23 - FERC Form No. 60, Annual reports of centralized service companies, and FERC-61, Narrative...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... functions. 366.23 Section 366.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL... or narrative description. (b) Transition period. Service companies in holding company systems...

  16. 77 FR 56835 - Constitution Pipeline Company, LLC; Notice of Intent To Prepare an Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-14

    ...? What Do I Need To Know?'' is available for viewing on the FERC Web site ( www.ferc.gov ). This fact...; Installation of four new meter and regulation (M&R) stations including: [ssquf] Central M&R Receipt Station--a new M&R receipt station, including [[Page 56836

  17. 76 FR 67727 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Work Group and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State Committee Work Group and Stakeholder Meeting The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meeting noted below. Their attendance...

  18. 77 FR 28861 - Commission Information Collection Activities (FERC-585); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Energy shortages and Contingency Plans under PURPA, to the Office of Management and Budget (OMB) for... Contingency Plans under PURPA. OMB Control No.: 1902-0138. Type of Request: Three-year extension of the FERC... Contingency Plans under PURPA'', is used by the Commission to implement the statutory provisions of section...

  19. 18 CFR 260.1 - FERC Form No. 2, Annual report for Major natural gas companies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... report for Major natural gas companies. 260.1 Section 260.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.1 FERC Form No. 2, Annual report for Major natural gas companies. (a...

  20. 76 FR 28760 - Commission Information Collection Activities (FERC-73); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... collection of data through the FERC Form No. 73. Their support stems from reliance on this data collection...) Reviewing instructions; (2) developing, acquiring, installing, and utilizing technology and systems for the... to providing this information, such as administrative costs and the cost for information technology...

  1. 75 FR 51036 - ANR Pipeline Company; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-18

    ... Company; Notice of Technical Conference August 11, 2010. By order dated July 30, 2010 \\1\\ the Federal... will be held on Wednesday, September 15, 2010 at the Commission's headquarters at 888 First Street, NE... July 30, 2010 order. \\1\\ ANR Pipeline Company, 132 FERC ] 61,090 (2010). FERC conferences are...

  2. 75 FR 74696 - Commission Information Collection Activities (FERC-555); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-01

    ... Commission as explained below. The Commission issued a Notice in the Federal Register (75 FR 57744, 09/22... applicable records for the regulated public utilities, natural gas and oil pipeline companies subject to the... record retention requirements under FERC-555 were underestimated in the previous renewal of this...

  3. 77 FR 46089 - Whitestone Power and Communications; Notice of Availability of Draft Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-02

    ... and Communications; Notice of Availability of Draft Environmental Assessment In accordance with the... digits in the docket number field to access the document. For assistance, contact FERC Online Support at... online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and...

  4. 76 FR 58803 - Commission Information Collection Activities (FERC-725A); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-22

    ... in Docket No. RD11-4-000 under the requirements of FERC-725A, ``Mandatory Reliability Standards for the Bulk-Power System'' (OMB No. 1902-0244), is required by Commission-approved Reliability Standard EOP-008-1 (Loss of Control Center Functionality) that requires reliability coordinators, transmission...

  5. 78 FR 58295 - Commission Information Collection Activities (FERC-725A); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... submitting the information collection FERC-725A, Mandatory Reliability Standards for the Bulk Power System... collection analysis associated with its approval of Reliability Standard EOP-004-2, in an order published in... solicitation and is making this notation in its submission to OMB. \\1\\ North American Electric Reliability Corp...

  6. 76 FR 46793 - Jordan Hydroelectric Limited Partnership; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-03

    ...'s Web site at http://www.ferc.gov using the ``eLibrary'' link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC... Commission's website under the ``eFiling'' link. For further information contact Gaylord Hoisington by...

  7. 77 FR 28872 - Notice of FERC Staff Attendance at the SPP-ITO Louisville Gas & Electric/Kentucky Utilities...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the SPP-ITO Louisville Gas & Electric/Kentucky Utilities Stakeholder Meeting The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meeting noted below. Their attendance...

  8. 76 FR 28024 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State Committee Meeting The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meetings noted below. Their attendance is part of the Commission's...

  9. 77 FR 21979 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Working Group and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-12

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State Committee Working Group and Stakeholder Meeting The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of its staff may attend the meeting noted below...

  10. 78 FR 6321 - PacifiCorp, et al; Notice of FERC Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-30

    ...Corp, et al; Notice of FERC Staff Attendance PacifiCorp Docket No. ER13-64-000 Deseret Generation... Regulatory Commission (Commission) hereby gives notice that on January 30, 2013, members of its staff will... and Commission staff's attendance is part of the Commission's ongoing outreach efforts. The meeting...

  11. 76 FR 49764 - Notice of FERC Staff Attendance at the Entergy ICT Transmission Planning Summit and Entegry...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-11

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy ICT Transmission Planning Summit and Entegry Regional State Committee Meeting The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meetings noted below...

  12. 76 FR 54766 - Notice of FERC Staff Attendance at a Hearing Before the Arkansas Public Service Commission

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-02

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at a Hearing Before the Arkansas Public Service Commission The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the hearing noted below. Their attendance is part of...

  13. 77 FR 47630 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Working Group and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State Committee Working Group and Stakeholder Meeting The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of its staff may attend the meeting noted below...

  14. 76 FR 55380 - California Independent System Operator Corporation; Notice of FERC Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-07

    ...; Notice of FERC Staff Attendance The Federal Energy Regulatory Commission (Commission) hereby gives notice that on the following dates members of its staff will participate in teleconferences and meetings to be.... Sponsored by the CAISO, the teleconferences and meetings are open to all market participants, and staff's...

  15. 77 FR 3765 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Work Group and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State Committee Work Group and Stakeholder Meeting The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meeting noted below. Their attendance...

  16. 77 FR 15097 - Notice of FERC Staff Attendance at the Entergy Regional State Committee Working Group and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Entergy Regional State Committee Working Group and Stakeholders Meeting The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meeting noted below. Their attendance...

  17. 77 FR 29634 - Notice of FERC Staff Attendance at the Louisiana Public Service Commission's Business and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-18

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Louisiana Public Service Commission's Business and Executive Session Meeting The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meeting noted below. Their attendance...

  18. 18 CFR 260.401 - FERC Form No. 552, Annual Report of Natural Gas Transactions.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., Annual Report of Natural Gas Transactions. 260.401 Section 260.401 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.401 FERC Form No. 552, Annual Report of Natural Gas Transactions. (a...

  19. 77 FR 53197 - Raven Power Marketing LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-31

    ... Marketing LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket... Marketing LLC's application for market-based rate authority, with an accompanying rate schedule, noting that... interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov . To facilitate electronic...

  20. 75 FR 32932 - Combined Notice of Filings No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-10

    ..., 2010. Docket Numbers: RP10-753-000. Applicants: Nexen Marketing, J. Aaron & Company. Description: Joint... Request for Expedited Consideration of Nexen Marketing U.S.A. Inc. and J. Aaron & Company. Filed Date: 05... interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov . To facilitate electronic...

  1. 78 FR 56691 - Sapphire Power Marketing LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-13

    ... Power Marketing LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Sapphire Power Marketing LLC's application for market-based rate authority, with an accompanying rate... submission of protests and interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov...

  2. 78 FR 20910 - Hess Energy Marketing, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-08

    ... Marketing, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket... Marketing, LLC's application for market-based rate authority, with an accompanying rate schedule, noting... interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov . To facilitate electronic...

  3. 77 FR 30274 - Inupiat Energy Marketing, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... Energy Marketing, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Inupiat Energy Marketing, LLC's application for market-based rate authority, with an accompanying rate... protests and interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov . To...

  4. 78 FR 49508 - Tesoro Refining & Marketing Company LLC; Supplemental Notice That Initial Market-Based Rate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-14

    ... Refining & Marketing Company LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes... proceeding of Tesoro Refining & Marketing Company LLC's application for market-based rate authority, with an... of protests and interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov...

  5. 75 FR 35017 - Brookfield Energy Marketing LP; Supplemental Notice That Initial Market-Based Rate Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    ... Energy Marketing LP; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... proceeding of Brookfield Energy Marketing LP's application for market-based rate authority, with an... protests and interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov . To...

  6. 78 FR 16262 - Tesoro Refining & Marketing Company LLC; Supplemental Notice That Initial Market-Based Rate...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-14

    ... Refining & Marketing Company LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes... proceeding, of Tesoro Refining & Marketing Company LLC's application for market- based rate authority, with... submission of protests and interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov...

  7. 75 FR 48666 - Calpine Mid-Atlantic Marketing, LLC; Supplemental Notice That Initial Market-Based Rate Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-11

    ...-Atlantic Marketing, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... proceeding, of Calpine Mid-Atlantic Marketing, LLC's application for market-based rate authority, with an... of protests and interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov...

  8. 78 FR 28837 - Myotis Power Marketing LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-16

    ... Marketing LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for Blanket... Marketing LLC's application for market-based rate authority, with an accompanying rate schedule, noting that... interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov . To facilitate electronic...

  9. 75 FR 24941 - PBF Power Marketing LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    ... Marketing LLC; Supplemental Notice That Initial Market- Based Rate Filing Includes Request for Blanket... of PBF Power Marketing LLC's application for market-based rate authority, with an accompanying rate... protests and interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov . To...

  10. 75 FR 80804 - Combined Notice of Filings No. 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-23

    ...: Compliance Filing--Missing Data Element to be effective 8/25/2010. Filed Date: 12/09/2010. Accession Number... of paper, using the FERC Online links at http://www.ferc.gov . To facilitate electronic service... must create and validate an eRegistration account using the eRegistration link. Select the eFiling link...

  11. 77 FR 16215 - Commission Information Collection Activities (FERC-716); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-20

    ...: Title: FERC-716, Good Faith Request for Transmission Service and Response by Transmitting Utility Under... valid good faith request for transmission has been made under section 211 of the FPA. By developing the.... As a result, 18 CFR 2.20 identifies 12 components of a good faith estimate and 5 components of a...

  12. 30 CFR 285.618 - What must I do upon completion of approved site assessment activities?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... expiration of your site assessment term, you timely submit a COP meeting the requirements of this subpart, or... your COP for approval or FERC reviews your license application for approval. (b) You are not required... your approved COP or approved FERC license. (c) If, following the technical and environmental review of...

  13. 77 FR 69781 - Enhanced Natural Gas Market Transparency

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-21

    ... be filed in native applications or print-to-PDF format and not in a scanned format, at http://www.... FERC, 661 F.3d 258 (5th Cir. 2011). \\17\\ Order Granting Motion to Clarify Opinion, Texas Pipelines Ass'n v. FERC, 661 F.3d 258 (Dec. 20. 2011). 8. In addition to adding the natural gas market...

  14. 78 FR 41056 - Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-09

    ... applications for original licenses for the Red River Lock and Dam No. 5 Hydroelectric Project (FERC Project No. 12758-004), Red River Lock and Dam No. 4 Hydroelectric Project (FERC Project No. 12757- 004), and Red... be located on the Red River in Louisiana. The Lock and Dam No. 5 Project would be located in Bossier...

  15. 77 FR 14773 - PostRock KPC Pipeline, LLC; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-13

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RP12-346-000] PostRock KPC... will address all aspects of PostRock KPC Pipeline, LLC's (KPC) proposed tariff revisions to be part of... issued on February 29, 2012.\\1\\ \\1\\ PostRock KPC Pipeline, LLC, 138 FERC ] 61,146 (2012). FERC...

  16. 76 FR 4516 - Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ...; Order No. 710-B] Revisions to Forms, Statements, and Reporting Requirements for Natural Gas Pipelines... for natural gas companies, contained in FERC Form Nos. 2, 2-A, and 3-Q, to include functionalized fuel..., and reports for natural gas companies, contained in FERC Form Nos. 2, 2-A, and 3-Q, to include...

  17. 18 CFR 141.400 - FERC Form No. 3-Q, Quarterly financial report of electric utilities, licensees, and natural gas...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., Quarterly financial report of electric utilities, licensees, and natural gas companies. 141.400 Section 141..., licensees, and natural gas companies. (a) Prescription. The quarterly report of electric utilities, licensees, and natural gas companies, designated as FERC Form No. 3-Q, is prescribed for the reporting...

  18. 18 CFR 260.300 - FERC Form No. 3-Q, Quarterly financial report of electric utilities, licensees, and natural gas...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., Quarterly financial report of electric utilities, licensees, and natural gas companies. 260.300 Section 260... ENERGY APPROVED FORMS, NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.300 FERC Form No. 3-Q, Quarterly financial report of electric utilities, licensees, and natural gas companies. (a) Prescription...

  19. 18 CFR 260.2 - FERC Form No. 2-A, Annual report for Nonmajor natural gas companies.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., Annual report for Nonmajor natural gas companies. 260.2 Section 260.2 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.2 FERC Form No. 2-A, Annual report for Nonmajor natural gas...

  20. 76 FR 31322 - Union Electric Company (dba Ameren Missouri); Notice of Scoping Meetings and Environmental Site...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-31

    ... Reynolds County, Missouri. The project occupies no Federal lands. g. Filed Pursuant to: Federal Power Act... http://www.ferc.gov using the ``eLibrary'' link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support. A...

  1. 77 FR 17472 - Texas Eastern Transmission, LP, Algonquin Gas Transmission, LLC; Notice of Availability of the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-03-26

    .... Paper copy versions of the EIS were mailed to those specifically requesting them; all others received a CD version. In addition, the EIS is available for public viewing on the FERC's Web site ( www.ferc.... Questions Additional information about the Project is available from the Commission's Office of External...

  2. 78 FR 64493 - Juneau Hydropower, Inc.; Notice of Subsequent Draft License Application (DLA) and Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-29

    ..., Business Manager, Juneau Hydropower, Inc., P.O. Box 22775, Juneau, AK 99802; 907-789-2775, email: duff... information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnline... number field to access the document. For assistance, contact FERC Online Support. You may also register...

  3. 76 FR 49460 - Commission Information Collection Activities (FERC 516A); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-10

    ... Information Collection Activities (FERC 516A); Comment Request; Submitted for OMB Review AGENCY: Federal... Office of Management and Budget, Office of Information and Regulatory Affairs, Attention: Federal Energy... estimated total cost to respondents is $84,739 (rounded) [1,238 hours divided by 2,080 hours per year, times...

  4. 78 FR 3893 - Columbia Gas Transmission, LLC; Notice of Request Under Blanket Authorization

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-17

    ... any natural gas service; however, Columbia would terminate service to one free gas customer pursuant to the terms of the lease agreement between the customer and Columbia. Columbia estimates that it... contact FERC Online Support at FERC Online[email protected] or call toll-free at (866) 206-3676, or, for...

  5. 78 FR 4406 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ...-14, Black Oak Energy LLC, et al., v. FERC Docket No. EL10-52, Central Transmission, LLC v. PJM.... PJM Interconnection, L.L.C. Docket No. EL08-14, Black Oak Energy LLC, et al., v. FERC Docket No. EL10... Fernandez, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502- 6604 or...

  6. 18 CFR 260.2 - FERC Form No. 2-A, Annual report for Nonmajor natural gas companies.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., Annual report for Nonmajor natural gas companies. 260.2 Section 260.2 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, NATURAL GAS ACT STATEMENTS AND REPORTS (SCHEDULES) § 260.2 FERC Form No. 2-A, Annual report for Nonmajor natural gas...

  7. 75 FR 59706 - Coastal Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-28

    .... The proposed project would consist of the following: (1) Three new submersible Kaplan turbine... to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov... printed on the ``eLibrary'' link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp...

  8. 75 FR 59707 - Coastal Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-28

    ... Kaplan turbine/generator units with a total installed capacity of 2.5 megawatts, to be installed... to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov... printed on the ``eLibrary'' link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp...

  9. 76 FR 52646 - Commision Information Collection Activities [FERC-588]; Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ... 1978 (NGPA), 15 USC 3301- 3432. Under the NGA, a natural gas company must obtain Commission approval to engage in the transportation, sale or exchange of natural gas in interstate commerce. However, Section 7... Commission issued a Notice in the Federal Register (76 FR 30928, 05/27/2011) requesting public comments. FERC...

  10. 75 FR 71427 - Domtar Paper Company, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-23

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER11-2020-000] Domtar Paper... proceeding, of Domtar Paper Company, LLC's application for market-based rate authority, with an accompanying... of protests and interventions in lieu of paper, using the FERC Online links at http://www.ferc.gov...

  11. 76 FR 13613 - Notice of FERC Staff Attendance at the ICT Stakeholders Policy Committee and Entergy Regional...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the ICT Stakeholders Policy Committee and Entergy Regional State Committee Meetings The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of its staff may attend the meetings noted below. Their attendance is part of the...

  12. 75 FR 63168 - Notice of FERC Staff Attendance at the Southwest Power Pool ICT Stakeholder Policy Committee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Southwest Power Pool ICT Stakeholder Policy Committee Meeting and the Entergy Regional State Committee Meeting October 6, 2010. The Federal Energy Regulatory Commission (Commission) hereby gives notice that members of its staff may attend the meeting...

  13. 18 CFR 260.8 - System flow diagrams: Format No. FERC 567.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false System flow diagrams...) § 260.8 System flow diagrams: Format No. FERC 567. (a) Each Major natural gas pipeline company, having a... file with the Commission by June 1 of each year five (5) copies of a diagram or diagrams reflecting...

  14. 18 CFR 260.8 - System flow diagrams: Format No. FERC 567.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false System flow diagrams...) § 260.8 System flow diagrams: Format No. FERC 567. (a) Each Major natural gas pipeline company, having a... file with the Commission by June 1 of each year five (5) copies of a diagram or diagrams reflecting...

  15. 18 CFR 260.8 - System flow diagrams: Format No. FERC 567.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false System flow diagrams...) § 260.8 System flow diagrams: Format No. FERC 567. (a) Each Major natural gas pipeline company, having a... file with the Commission by June 1 of each year five (5) copies of a diagram or diagrams reflecting...

  16. 18 CFR 260.8 - System flow diagrams: Format No. FERC 567.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false System flow diagrams...) § 260.8 System flow diagrams: Format No. FERC 567. (a) Each Major natural gas pipeline company, having a... file with the Commission by June 1 of each year five (5) copies of a diagram or diagrams reflecting...

  17. 18 CFR 260.8 - System flow diagrams: Format No. FERC 567.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false System flow diagrams...) § 260.8 System flow diagrams: Format No. FERC 567. (a) Each Major natural gas pipeline company, having a... file with the Commission by June 1 of each year five (5) copies of a diagram or diagrams reflecting...

  18. 75 FR 10248 - GB Energy Park, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ...-deep, 3-mile-long canal carrying flows diverted from Cottonwood Creek by an existing diversion... on the Commission's Web site ( http://www.ferc.gov/docs-filing/ferconline.asp ) under the ``eFiling...Library'' link of Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp . Enter the docket...

  19. 75 FR 78236 - Lock+TM

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-15

    ...-foot-wide, 20-foot-deep excavated power canal; (2) a 55-foot-long, 65-foot-wide, 8-foot-deep excavated... 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/docs... Web site at http://www.ferc.gov/docs-filing/elibrary.asp . Enter the docket number (P-13743-000, 13753...

  20. FERC examines transmission access pricing policies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Burkhart, L.A.

    1993-02-15

    The Federal Energy Regulatory Commission (FERC) has approved two orders dealing with transmission pricing issues that evolved from its March 1992 Pennsylvania Electric Co. (Penelec) decision dealing with cost recovery of transmission plant expansion. Commissioner Betsy Moler said the cases represented the first time the FERC has used incremental rates for wheeling transactions. In the first new order, Public Service Electric Gas Co. proposed charging for third-party transmission services to recover the sum of its standard embedded cost rate and the net incremental cost of making upgrades to its integrated transmission system. Public Service sought to provide service to EEAmore » I Limited, which proposed building and operating a cogeneration facility at a United States Gypsum Co. plant in New Jersey. Consolidated Edison Company of New York Inc. had agreed to purchase the project's output. In rejecting Public Service's proposal, the FERC ruled the utility must charge a transmission rate that is the higher of either its embedded cost rate or its incremental cost rate of accelerated expansion. (In this instance, the incremental rate was higher). In the second new order, Public Service Co. of Colorado (PSCC) filed a proposed open access transmission service tariff related to its acquisition of facilities from Colorado-Ute Electric Association Inc. The FERC rejected PSCC's tariff request that would have required a new transmission customer (in the event PSCC modified its integrated transmission grid) to pay the sum of PSCC's standard transmission rate (reflecting the average cost of the grid facilities) plus the expansion cost (reflecting the incremental facility cost).« less

  1. 76 FR 12094 - Andrew Peklo III; Notice of Application Tendered for Filing With the Commission and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-04

    ... Road, Woodbury, CT 06798, (203) 263-4566, [email protected]net . i. FERC Contact: Steve Kartalia, (202.../ferconline.asp). Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your name...

  2. 78 FR 21921 - Andrew Peklo III; Notice of Application Accepted for Filing, Intent To Waive Scoping, Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-04-12

    ..., (203) 263-4566, [email protected]net . i. FERC Contact: Steve Kartalia, (202) 502-6131 or Stephen...-filing/efiling.asp . Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your...

  3. 76 FR 70433 - Andrew Peklo III; Notice of Application Accepted for Filing with the Commission, Intent to Waive...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-14

    ..., Woodbury, CT 06798, (203) 263-4566, [email protected]net . i. FERC Contact: Steve Kartalia, (202) 502-6131... http://www.ferc.gov/docs-filing/efiling.asp . Commenters can submit brief comments up to 6,000....asp . You must include your name and contact information at the end of your comments. For assistance...

  4. 77 FR 23239 - Bryant Mountain, LLC; Notice of Additional Scoping Meetings, Extension of Time To File Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-18

    ... Bay, California 94505, (925) 634-1550 or email at [email protected]net . j. FERC Contact: Ryan.... Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filing....gov/docs-filing/efiling.asp . Commenters can submit brief comments up to 6,000 characters, without...

  5. 77 FR 76026 - Tlingit-Haida Regional Electric Authority; Notice of Preliminary Permit Application Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ... megawatt and 780 feet of net head; (6) a 50-foot-long tailrace connecting the powerhouse with the Little... on the Commission's Web site http://www.ferc.gov/docs-filing/efiling.asp . Commenters can submit...://www.ferc.gov/docs-filing/ecomment.asp . You must include your name and contact information at the end...

  6. 77 FR 27769 - Greybull Valley Irrigation District; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-11

    ... unit rated at 5 megawatts or less at 150 feet of net head; (3) a tailrace channel discharging from the... instructions on the Commission's Web site http://www.ferc.gov/docs-filing/efiling.asp . Commenters can submit...://www.ferc.gov/docs-filing/ecomment.asp . You must include your name and contact information at the end...

  7. 75 FR 71103 - Hampshire Paper Company; Notice of Application Accepted for Filing, Soliciting Motions To...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-22

    ... on the Commission's Web site http://www.ferc.gov/docs-filing/efiling.asp . Commenters can submit...://www.ferc.gov/docs-filing/ecomment.asp . You must include your name and contact information at the end... cubic feet per second and a net head of 32 feet, directly connected to a horizontal generator unit with...

  8. 76 FR 67724 - Duke Energy Carolinas, LLC; Notice of Application for Amendment of License and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-11-02

    ... on the Commission's web site at http://www.ferc.gov/docs-filing/efiling.asp . If unable to be filed... http://www.ferc.gov/docs-filing/ecomment.asp . You must include your name and contact information at... account for differences in net head resulting from operations under the new license for the project. l...

  9. 75 FR 73066 - FFP Missouri 13, LLC; Grays Hydro, LLC; Notice of Competing Preliminary Permit Applications...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-29

    ....2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/docs-filing... Web site at http://www.ferc.gov/docs-filing/elibrary.asp . Enter the docket number (P-13763-000, or...) Grays Landing Lock & Dam located on the Monongahela River in Greene County, Pennsylvania. The sole...

  10. 77 FR 38051 - Jones Canyon Hydro, LLC; Notice of Application for Amendment of Preliminary Permit Accepted for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-26

    ... proposed reservoirs from 6,225 feet to 7,330 feet; and (7) change the name of the project from ``Jones Canyon Pumped Storage Project'' to ``Oregon Winds Pumped Storage''. FERC Contact: Jennifer Harper, 202..., using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your name...

  11. 78 FR 57626 - Algonquin Gas Transmission, LLC; Notice of Intent To Prepare An Environmental Impact Statement...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-19

    ... Interstate Natural Gas Facility On My Land? What Do I Need To Know?'' is available for viewing on the FERC Web site ( www.ferc.gov ). This fact sheet addresses a number of typically-asked questions, including... Relay (L&R) \\2\\); \\2\\ Lift and relay refers to a construction method by which an existing pipeline is...

  12. 77 FR 66605 - Nashua Hydro Associates; Notice of Application for Amendment of Exemption and Soliciting Comments...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... Hampshire. g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a-825(r). h. Applicant Contact: Mr. Andrew..., DC 20004, (202) 585-8338, [email protected] . i. FERC Contact: Kelly Houff, (202) 502-6393... the instructions on the Commission's Web site http://www.ferc.gov/docs-filing/efiling.asp . Commenters...

  13. 75 FR 35001 - Commission Information Collection Activities (FERC-FERC-725E); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    ... and request for comments. SUMMARY: In compliance with the requirements of section 3506(c)(2)(A) of the Paperwork Reduction Act of 1995, 44 U.S.C. 3506(c)(2)(A) (2006), (Pub. L. No. 104-13), the Federal Energy... electronically must send an original and two (2) paper copies of their comments to: Federal Energy Regulatory...

  14. 78 FR 57375 - Toutant Hydro Power, Inc.; Energy System, LLC.; Notice of Application for Transfer of License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-18

    ... viewed or printed on the eLibrary link of Commission's Web site at http://www.ferc.gov/docs-filing... Power, Inc.; Energy System, LLC.; Notice of Application for Transfer of License, and Soliciting Comments... System, LLC (transferee) filed an application for transfer of license for the M.S.C. Power Project, FERC...

  15. 78 FR 935 - Copper Valley Electric Association, Inc.; Notice of Availability of Environmental Assessment

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-07

    ... available for review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site at www.ferc.gov using the ``eLibrary'' link. Enter the docket number excluding the last three... Web site at http://www.ferc.gov/docs-filing/efiling.asp . Commenters can submit brief comments up to 6...

  16. 77 FR 34032 - American River Power III, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-08

    ... Commission's Web site http:[sol][sol]www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http:[sol][sol... on the ``eLibrary'' link of Commission's Web site at http:[sol][sol]www.ferc.gov/docs-filing...

  17. 77 FR 70886 - Reconsideration of Letters of Recommendation for Waterfront Facilities Handling LNG and LHG

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-28

    ... issues the LOR to FERC, as part of FERC's public comment and decision making process, as a function of... establishes a separate process for reconsideration of LORs by the Coast Guard. The process applies only to... role and purpose of the LOR, and establishes a separate process for reconsideration of LORs issued by...

  18. 18 CFR 141.51 - FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ..., Annual Electric Balancing Authority Area and Planning Area Report. 141.51 Section 141.51 Conservation of...) § 141.51 FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report. (a) Who... Policies Act, 16 U.S.C. 2602, operating a balancing authority area, and any group of electric utilities...

  19. 18 CFR 141.51 - FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ..., Annual Electric Balancing Authority Area and Planning Area Report. 141.51 Section 141.51 Conservation of...) § 141.51 FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report. (a) Who... Policies Act, 16 U.S.C. 2602, operating a balancing authority area, and any group of electric utilities...

  20. 18 CFR 141.51 - FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ..., Annual Electric Balancing Authority Area and Planning Area Report. 141.51 Section 141.51 Conservation of...) § 141.51 FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report. (a) Who... Policies Act, 16 U.S.C. 2602, operating a balancing authority area, and any group of electric utilities...

  1. 18 CFR 141.51 - FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ..., Annual Electric Balancing Authority Area and Planning Area Report. 141.51 Section 141.51 Conservation of...) § 141.51 FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report. (a) Who... Policies Act, 16 U.S.C. 2602, operating a balancing authority area, and any group of electric utilities...

  2. 18 CFR 141.51 - FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ..., Annual Electric Balancing Authority Area and Planning Area Report. 141.51 Section 141.51 Conservation of...) § 141.51 FERC Form No. 714, Annual Electric Balancing Authority Area and Planning Area Report. (a) Who... Policies Act, 16 U.S.C. 2602, operating a balancing authority area, and any group of electric utilities...

  3. 76 FR 28764 - Northwest Pipeline, GP; Notice of Availability of the Environmental Assessment for the Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-05-18

    ... your submission. The Commission encourages electronic filing of comments and has dedicated eFiling... http://www.ferc.gov under the link to Documents and Filings. An eComment is an easy method for... electronically by using the eFiling feature, which is located on the Commission's Web site at http://www.ferc.gov...

  4. 78 FR 30915 - Pacific Gas and Electric Company; Nevada Irrigation District; Notice of Availability of the Draft...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... Availability of the Draft Environmental Impact Statement for the Drum-Spaulding and Yuba-Bear Hydroelectric... license for the Drum- Spaulding Project (FERC No. 2310) and the Yuba-Bear Project (FERC No. 2266) and has... located within three primary river basins, the South Yuba River, Bear River, and North Fork of the North...

  5. 75 FR 71429 - Qualified Hydro 33, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-23

    .... The proposed project will consist of the following: (1) One vertical Kaplan turbine-generator with a... to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov... printed on the ``eLibrary'' link of the Commission's Web site at http://www.ferc.gov/docs-filing/elibrary...

  6. 75 FR 41858 - Notice of FERC Staff Attendance at the Southwest Power Pool ICT Stakeholder Policy Committee Meeting

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Southwest Power Pool ICT Stakeholder Policy Committee Meeting July 12, 2010. The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meeting noted below. Their attendance is part of the Commission's...

  7. 75 FR 23262 - Notice of FERC Staff Attendance at the Southwest Power Pool ICT Stakeholder Policy Committee...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-03

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the Southwest Power Pool ICT Stakeholder Policy Committee Meeting and the Entergy Regional State Committee Meeting April 26, 2010. The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meetings noted below....

  8. 33 CFR 221.1 - Investigation and supervision of hydropower projects under the Federal Power Act (ER 1140-2-4).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... gives the permittee priority of application for a FERC license over other non-Federal entities for a... licenses. In investigation of an application for FERC license or permit, consideration will be given to... Acts as well as special Acts of Congress prior to 1920, or requests for advice with respect thereto...

  9. 75 FR 5061 - Commission Information Collection Activities (FERC Form Nos. 6 and 6-Q); Comment Request; Extensions

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-01

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket Nos. IC10-6-000 and IC10-6Q-000] Commission Information Collection Activities (FERC Form Nos. 6 and 6-Q); Comment Request; Extensions January... to Docket Nos. IC10-6-000 and IC10-6Q-000. For comments that only pertain to one of the collections...

  10. 78 FR 78352 - Plant-E Corp; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ..., under 18 CFR Part 34, of future issuances of securities and assumptions of liability is January 7, 2014... the FERC Online links at http://www.ferc.gov . To facilitate electronic service, persons with Internet... J. Davis, Sr., Deputy Secretary. [FR Doc. 2013-30697 Filed 12-24-13; 8:45 am] BILLING CODE 6717-01-P ...

  11. 18 CFR 388.106 - Requests for Commission records available in the Public Reference Room and from the Commission's...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Requests for Commission records available in the Public Reference Room and from the Commission's web site, http://www.ferc.gov... available in the Public Reference Room and from the Commission's web site, http://www.ferc.gov. (a)(1) A...

  12. 77 FR 58122 - Colorado Interstate Gas Company, L.L.C.; Notice of Intent To Prepare an Environmental Assessment...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-19

    ... accordance with state law. CIG provided landowners with a fact sheet prepared by the FERC entitled ``An... used to measure new sources of supply into the existing High Plains System; Modify an existing meter... notice in the mail and are available at www.ferc.gov using the link called ``eLibrary'' or from the...

  13. 78 FR 58300 - Texas Eastern Transmission, LP; Notice of Availability of the Environmental Assessment for the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... Mississippi. \\2\\ A ``pig'' is a tool that is inserted into and moves through the pipeline, and is used for... Web site ( www.ferc.gov ) using the eLibrary link. A limited number of copies of the EA are available... using the eComment feature on the Commission's Web site ( www.ferc.gov ) under the link to Documents and...

  14. 75 FR 24938 - Questar Pipeline Company; Notice of Intent to Prepare an Environmental Assessment for the Planned...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-06

    .../receivers; \\2\\ \\2\\ A ``pig'' is a tool that is inserted into and moves through the pipeline, and is used for...://www.ferc.gov using the link called ``eLibrary'' or from the Commission's Public Reference Room, 888... feature, which is located at http://www.ferc.gov under the link called ``Documents and Filings''. A Quick...

  15. 77 FR 32629 - Black Canyon Hydro, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... be viewed on the Web at http://www.ferc.gov , using the ``eLibrary'' link. Follow the directions for... review at the Commission in the Public Reference Room or may be viewed on the Commission's Web site ( http://www.ferc.gov ), using the ``eLibrary'' link. Enter the docket number, excluding the last three...

  16. 77 FR 70423 - Black Bear Hydro Partners, LLC and Black Bear Development Holdings, LLC and Black Bear SO, LLC...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-26

    ... viewed or printed on the eLibrary link of Commission's Web site at http://www.ferc.gov/docs-filing... instructions on the Commission's Web site under http://www.ferc.gov/docs-filing/efiling.asp . Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at...

  17. 78 FR 12049 - Marlborough Hydro Associates; Ashuelot River Hydro, Inc.; Notice of Application for Transfer of...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-21

    ... information about this project can be viewed or printed on the eLibrary link of Commission's Web site at http... CFR 385.2001(a)(1) and the instructions on the Commission's Web site under http://www.ferc.gov/docs... registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You must include your...

  18. 76 FR 20971 - Turlock Irrigation District and Modesto Irrigation District; Notice of Intent To File License...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-04-14

    ... viewed on the Commission's Web site ( http://www.ferc.gov ), using the ``eLibrary'' link. Enter the..., or may be viewed on the web at http://www.ferc.gov , using the ``eLibrary'' link. Follow the... electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site...

  19. 18 CFR 388.106 - Requests for Commission records available in the Public Reference Room and from the Commission's...

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Requests for Commission records available in the Public Reference Room and from the Commission's web site, http://www.ferc.gov... available in the Public Reference Room and from the Commission's web site, http://www.ferc.gov. (a)(1) A...

  20. 18 CFR 388.106 - Requests for Commission records available in the Public Reference Room and from the Commission's...

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Requests for Commission records available in the Public Reference Room and from the Commission's web site, http://www.ferc.gov... available in the Public Reference Room and from the Commission's web site, http://www.ferc.gov. (a)(1) A...

  1. 18 CFR 388.106 - Requests for Commission records available in the Public Reference Room and from the Commission's...

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Requests for Commission records available in the Public Reference Room and from the Commission's web site, http://www.ferc.gov... available in the Public Reference Room and from the Commission's web site, http://www.ferc.gov. (a)(1) A...

  2. 18 CFR 388.106 - Requests for Commission records available in the Public Reference Room and from the Commission's...

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Requests for Commission records available in the Public Reference Room and from the Commission's web site, http://www.ferc.gov... available in the Public Reference Room and from the Commission's web site, http://www.ferc.gov. (a)(1) A...

  3. 33 CFR 127.007 - Letter of intent and waterway suitability assessment.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Regulatory Commission (FERC) under 18 CFR parts 153 and 157, but, in all cases, at least 1 year prior to the... jurisdiction, but, in all cases, at least 1 year prior to the start of construction. (b) An owner or operator... request with FERC under 18 CFR parts 153 and 157, but, in all cases, at least 1 year prior to the start of...

  4. 33 CFR 127.007 - Letter of intent and waterway suitability assessment.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Regulatory Commission (FERC) under 18 CFR parts 153 and 157, but, in all cases, at least 1 year prior to the... jurisdiction, but, in all cases, at least 1 year prior to the start of construction. (b) An owner or operator... request with FERC under 18 CFR parts 153 and 157, but, in all cases, at least 1 year prior to the start of...

  5. 33 CFR 127.007 - Letter of intent and waterway suitability assessment.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Regulatory Commission (FERC) under 18 CFR parts 153 and 157, but, in all cases, at least 1 year prior to the... jurisdiction, but, in all cases, at least 1 year prior to the start of construction. (b) An owner or operator... request with FERC under 18 CFR parts 153 and 157, but, in all cases, at least 1 year prior to the start of...

  6. 78 FR 2982 - Northwest Pipeline GP; Notice of Availability of the Environmental Assessment for the Proposed...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... consider your comments prior to making its decision on this project, it is important that we receive your... for public viewing on the FERC's Web site ( www.ferc.gov ) using the eLibrary link. A limited number... first create an account by clicking on ``eRegister.'' You must select the type of filing you are making...

  7. 76 FR 10360 - Qualified Hydro 25, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-24

    ... powerhouse containing one Kaplan turbine with a capacity of 1.2 megawatts; (6) a new substation; (7) a new...., Gloucester, MA 01930; phone: (978) 283-2822. FERC Contact: Ryan Hansen (202) 502-8074 or by e-mail at ryan... prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp . You must...

  8. 76 FR 14388 - David Creasey; Notice of Application Tendered for Filing With the Commission, Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-16

    ... No.: 13829-001. c. Date filed: February 4, 2011. d. Applicant: David Creasey. e. Name of Project... on private property owned by the applicant. h. Filed Pursuant to: 18 CFR 4.61 of the Commission's.... FERC Contact: Ryan Hansen, (202) 502-8074, or e-mail at ryan.hansen@ferc.gov . k. A copy of the...

  9. 76 FR 14652 - Port Barre Investments, L.L.C.; Notice of Application

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-17

    ... Investments, L.L.C.; Notice of Application Take notice that on March 4, 2011, Port Barre Investments, L.L.C. (Bobcat) filed in Docket No. CP11-124-000 an application pursuant to section 7(c) of the Natural Gas Act... Investments, L.L.C., 126 FERC ] 61,240 (2009). \\2\\ Port Barre Investments, L.L.C., 130 FERC ] 62,272 (2010...

  10. 78 FR 2988 - New England Hydropower Company, LLC; Notice of Preliminary Permit Application Accepted for Filing...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-15

    ... above mean sea level (msl); (3) an existing 12-foot-long, 16-foot-wide, 10-foot-deep head box and intake....2001(a)(1)(iii) and the instructions on the Commission's Web site http:[sol][sol]www.ferc.gov/docs... Commission's Web site at http:[sol][sol]www.ferc.gov/docs-filing/ elibrary.asp. Enter the docket number (P...

  11. 78 FR 18334 - JAL Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ...) a new 130-foot-long, 20-foot-wide, 6-foot-deep concrete intake channel; (4) a new 10-foot-high, 20... on the Commission's Web site http://www.ferc.gov/docs-filing/efiling.asp . Commenters can submit... viewed or printed on the ``eLibrary'' link of Commission's Web site at http://www.ferc.gov/docs-filing...

  12. TidGen Power System Commercialization Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sauer, Christopher R.; McEntee, Jarlath

    2013-12-30

    ORPC Maine, LLC, a wholly-owned subsidiary of Ocean Renewable Power Company, LLC (collectively ORPC), submits this Final Technical Report for the TidGen® Power System Commercialization Project (Project), partially funded by the U.S. Department of Energy (DE-EE0003647). The Project was built and operated in compliance with the Federal Energy Regulatory Commission (FERC) pilot project license (P-12711) and other permits and approvals needed for the Project. This report documents the methodologies, activities and results of the various phases of the Project, including design, engineering, procurement, assembly, installation, operation, licensing, environmental monitoring, retrieval, maintenance and repair. The Project represents a significant achievement formore » the renewable energy portfolio of the U.S. in general, and for the U.S. marine hydrokinetic (MHK) industry in particular. The stated Project goal was to advance, demonstrate and accelerate deployment and commercialization of ORPC’s tidal-current based hydrokinetic power generation system, including the energy extraction and conversion technology, associated power electronics, and interconnection equipment capable of reliably delivering electricity to the domestic power grid. ORPC achieved this goal by designing, building and operating the TidGen® Power System in 2012 and becoming the first federally licensed hydrokinetic tidal energy project to deliver electricity to a power grid under a power purchase agreement in North America. Located in Cobscook Bay between Eastport and Lubec, Maine, the TidGen® Power System was connected to the Bangor Hydro Electric utility grid at an on-shore station in North Lubec on September 13, 2012. ORPC obtained a FERC pilot project license for the Project on February 12, 2012 and the first Maine Department of Environmental Protection General Permit issued for a tidal energy project on January 31, 2012. In addition, ORPC entered into a 20-year agreement with Bangor Hydro Electric Company on January 1, 2013 for up to 5 megawatts at a price of $215/MWh, escalating at 2.0% per year.« less

  13. Restructuring the natural gas industry: Order No. 436 and other regulatory initiatives

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Griggs, J.W.

    1986-01-01

    Federal Energy Regulatory Commission (FERC) Order No. 436 is the latest in a series of major regulatory initiatives that have impacted gas pricing, pipeline contracting provisions, spot market sales, and transportation. The policy followed by FERC reflects a faith in the free market to efficiently allocate resource at reasonable cost to consumers. In responding to deregulation mandates while retaining regulation of the price of old gas and of interstate transportation and sales for resale, FERC is unbundling gas costs from the fixed costs of providing service in hopes of improving price signals. It is also pushing pipelines to provide openmore » access to inject competition. The long-term commitments needed by producers may be incompatible with the oscillations caused by market restructuring, but there is a possibility that the new approach will work.« less

  14. 76 FR 51965 - National Fuel Gas Supply Corporation; Notice of Intent To Prepare an Environmental Assessment for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-19

    ... crossings south of the Buffalo Compressor Station. \\1\\ A ``pig'' is a tool that is inserted into and moves... receiving this notice in the mail and are available at http://www.ferc.gov using the link called ``eLibrary... Commission's Web site at http://www.ferc.gov under the link to Documents and Filings. An eComment is an easy...

  15. 77 FR 32626 - Transcontinental Gas Pipe Line Company, LLC; Notice of Intent To Prepare an Environmental Impact...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... Land? What Do I Need To Know?'' is available for viewing on the FERC Web site ( www.ferc.gov ). This... in Lower New York Bay by adding a new pipeline lateral and a meter and regulating (M&R) station... main line valve. \\1\\ A pig is an internal tool that can be used to clean and dry a pipeline and/or to...

  16. Report of the Committee on Ethics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    1992-01-01

    This report provides an update on ethics issues and decisions under the recently revised District of Columbia Rules of Professional Responsibility, the proposed rules of conduct issued by the Office of Government Ethics is applicable to employees of the Department of Energy (DOE) and the Federal Energy Regulatory Commission (FERC), federal statutory guidelines governing post-employment restrictions on former government employees, and important developments in the FERC's rules governing ex parte communication.

  17. 75 FR 63169 - Dirk Wiggins; Notice of Petition for Declaratory Order and Soliciting Comments, Protests, and/or...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-14

    .... See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site at http://www.ferc..., 3.75-foot-wide, 2-foot-deep pond; (2) a 1-foot-high lumber diversion into 2.5-foot-high, 3.75-foot... public inspection. This filing may be viewed on the web at http://www.ferc.gov using the ``eLibrary...

  18. 75 FR 52520 - White River Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ...) a 12-foot-diameter, 2,842-foot-long concrete tunnel; (10) a 73-foot-deep forebay; (11) three 5.4- to... Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc... Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp . Enter the docket number (P-13804) in...

  19. Development of new geomagnetic storm ground response scaling factors for utilization in hazard assessments

    NASA Astrophysics Data System (ADS)

    Pulkkinen, A. A.; Bernabeu, E.; Weigel, R. S.; Kelbert, A.; Rigler, E. J.; Bedrosian, P.; Love, J. J.

    2017-12-01

    Development of realistic storm scenarios that can be played through the exposed systems is one of the key requirements for carrying out quantitative space weather hazards assessments. In the geomagnetically induced currents (GIC) and power grids context, these scenarios have to quantify the spatiotemporal evolution of the geoelectric field that drives the potentially hazardous currents in the system. In response to the Federal Energy Regulatory Commission (FERC) order 779, a team of scientists and engineers that worked under the auspices of North American Electric Reliability Corporation (NERC), has developed extreme geomagnetic storm and geoelectric field benchmark(s) that use various scaling factors that account for geomagnetic latitude and ground structure of the locations of interest. These benchmarks, together with the information generated in the National Space Weather Action Plan, are the foundation for the hazards assessments that the industry will be carrying out in response to the FERC order and under the auspices of the National Science and Technology Council. While the scaling factors developed in the past work were based on the best available information, there is now significant new information available for parts of the U.S. pertaining to the ground response to external geomagnetic field excitation. The significant new information includes the results magnetotelluric surveys that have been conducted over the past few years across the contiguous US and results from previous surveys that have been made available in a combined online database. In this paper, we distill this new information in the framework of the NERC benchmark and in terms of updated ground response scaling factors thereby allowing straightforward utilization in the hazard assessments. We also outline the path forward for improving the overall extreme event benchmark scenario(s) including generalization of the storm waveforms and geoelectric field spatial patterns.

  20. 76 FR 17413 - Contract Reporting Requirements of Intrastate Natural Gas Companies; Notice of Technical Workshop...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-03-29

    ... the PDF or XML version of Form No. 549D as a method to eFile quarterly data and whether they intend on... fillable Form No. 549D PDF and XML to file data \\2\\ pursuant to Order Nos. 735 and 735-A.\\3\\ [[Page 17414... PDF ( http://www.ferc.gov/docs-filing/forms/form-549d/form-549d.pdf ) or XML ( http://www.ferc.gov...

  1. Stranded investment, prices and privacy factor in FERC rulings

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    O`Driscoll, M.

    The Federal Energy Regulatory Commission upheld its rejection of United Illuminating Co.`s bid to recover stranded investment costs. Since UI has no wholesale customers, it is a matter best left to state regulators, FERC said. UI`s stranded investment recovery plan was part of the company`s transmission access tariff, which provides for open access transmission service at cost-based rates. FERC ordered UI to delete the stranded investment provisions, saying UI was trying to recover in its wholesale transmission rates the costs of generation facility investments that were incurred to provide service to retail customers that leave its system, reasoning that UImore » was seeking protection from what may be legitimate retail franchise competition, which is a state matter. UI, however, said deleting the stranded investment provision would preclude it from arguing in an individual rate filling under the transmission tariff that stranded investment costs should be borne by the wheeling customer.« less

  2. Are state renewable feed-in tariff initiatives truly throttled by Federal statutes after the FERC California decision?

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Yaffe, David P.

    For the last few years, several local and state governments have adopted ''feed-in tariffs'' to promote development of dispersed, small-scale renewable generation through incentive pricing. Most FITs are intended to stimulate development of small solar or renewable energy facilities. In July, FERC issued a decision restating that the Federal Power Act and PURPA 210, not state (or local) legislation, govern the price that local utilities may pay under FITs. (author)

  3. Minimum flow unit installation at the South Edwards Hydro Plant

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bernhardt, P.; Bates, D.

    1995-12-31

    Niagara Mohawk Power Corp. owns and operates the 3.3 MW South Edwards Hydro Plant in Northern New York. The FERC license for this plant requires a minimum flow release in the bypass region of the river. NMPC submitted a license amendment to the FERC to permit the addition of a minimum flow unit to take advantage of this flow. The amendment was accepted, permitting the installation of the 236 kw, 60 cfs unit to proceed. The unit was installed and commissioned in 1994.

  4. An analysis of electricity price behavior when the market in California was dysfunctional

    NASA Astrophysics Data System (ADS)

    Lee, Yoo-Soo

    The electricity market in California worked well for the first two years after restructuring, but in the summer of 2000 there were frequent high price spikes and then persistently high prices during the winter and the spring of 2001. This research develops econometric models to explain the behavior of the spot and forward prices for electricity and the relationship between them when the market in California was dysfunctional. The first results demonstrate that the high spot prices in the day-ahead market during the summer of 2000 were caused by changes in the bid behavior of buyers as well as by the offer behavior of sellers. After the Federal Energy Regulatory Commission (FERC) declared that these high spot prices were "unjust and unreasonable", the FERC approved the payment of refunds to customers in California but not in other areas within the Western Inter-Connection (WECC). However, the results of a Vector Auto-Regressive model (VAR) show that the high spot prices in California were transferred immediately to other states in the WECC and the spot prices at different trading hubs belong to a single market. After the intervention by FERC in December 2000, spot prices and forward prices of electricity were unusually high. Estimated distributed lag models, using both monthly and daily data, show that there were strong positive relationships between the price shocks for electricity and natural gas in the spot markets and the forward prices for electricity. Risk premiums in the forward prices for electricity were estimated and the results show that the price shocks for electricity after FERC's intervention were the primary cause of the high forward prices. The main conclusions for regulatory policy are (1) it is virtually impossible to contain the effects of a dysfunctional electricity market to a single region because other regions are linked through the electrical grid, and (2) it is essential to intervene immediately and effectively when the spot prices have been ruled by regulators to be unjust and unreasonable. The intervention by the FERC did not prevent persistently high spot and forward prices for customers throughout the WECC.

  5. New FERC chairman says plenty of activity yet to come

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Share, J.

    Utility executives may have slowed their merger and acquisition activity to catch their breath, but it`s far from over, says Jim Hoecker, the new chairman of the Federal Energy Regulatory Commission. He doesn`t think we`ve seen the last of this phenomenon. As the industry begins to understand the shape of market developments to come in the future, increasingly creative M and A activities will be seen. But there`s also many other contractual arrangements among utilities and between utilities, pipelines, and gas distribution companies that reflect the more dynamic market of today. In the interview, he referred to a survey ofmore » utility executives in which as many as 45% indicated that their companies were involved in merger or acquisition activity. That survey found about 70% of these executives felt there is going to be more consolidation within the utility industry and an even larger proportion concluded there would be increased mergers between the electric and natural gas industries. In addition, Hoecker discusses gas versus electric, gas versus coal, and FERC`s future.« less

  6. Planning Electric Transmission Lines: A Review of Recent Regional Transmission Plans

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Eto, Joseph H.

    The first Quadrennial Energy Review (QER) recommends that the U.S. Department of Energy (DOE) conduct a national review of transmission plans and assess the barriers and incentives to their implementation. DOE tasked Lawrence Berkeley National Laboratory (LBNL) to prepare two reports to support the agency’s response to this recommendation. This report reviews regional transmission plans and regional transmission planning processes that have been directed by Federal Energy Regulatory Commission (FERC) Order Nos. 890 and 1000. We focus on the most recent regional transmission plans (those issued in 2015 and through approximately mid-year 2016) and current regional transmission planning processes. Amore » companion report focuses on non-plan-related factors that affect transmission projects.« less

  7. Assessing the "need to negotiate" in FERC licensing consultations: a study of two hydropower projects

    USGS Publications Warehouse

    Coughlan, Beth A. K.; Burkardt, Nina; Fulton, David

    1993-01-01

    We investigated the “need to negotiate” in a comparative case study of multi-agency negotiations in the FERC licensing process. Researchers interviewed participants in two cases involving environmental consultations and asked about parties' level of need to negotiate throughout the process. Participants identified a need to negotiate, and when this need was strongly felt, there was an increased opportunity for an agreement to be reached. An intense need to negotiate by all parties is not a prerequisite to successful agreements. When key participants have a strong need to negotiate, they can instigate negotiations and encourage the involvement of other parties.

  8. Retail wheeling - users, utilities and power producers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kubacki, J. Jr.

    1996-12-31

    Information is outlined on the retail wheeling of electric power. Topics discussed include: SEL mission; average cost per kWh; retail pilot programs; retail wheeling activity; key tasks for industrials; power marketer quote; retail wheeling strategic planning; metered customer load profile; proposed ISO regions; conjunctive billing; interconnection areas; FERC order 888; open access same time information systems; transmission inferconnections; suppliers of energy and capacity; self-generation; FERC Form 714; rebundling unbundled services; key variables: load factor; energy and capacity; metering today; competitive industry configuration; power cost reduction: strategic planning; real-time pricing; prime sources of leverage; likeliness of switching utilities; and Strategic Energymore » Ltd.« less

  9. Acoustic Monitoring of Beluga Whale Interactions with Cook Inlet Tidal Energy Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Worthington, Monty

    Cook Inlet, Alaska is home to some of the greatest tidal energy resources in the U.S., as well as an endangered population of beluga whales (Delphinapterus leucas). Successfully permitting and operating a tidal power project in Cook Inlet requires a biological assessment of the potential and realized effects of the physical presence and sound footprint of tidal turbines on the distribution, relative abundance, and behavior of Cook Inlet beluga whales. ORPC Alaska, working with the Project Team—LGL Alaska Research Associates, University of Alaska Anchorage, TerraSond, and Greeneridge Science—undertook the following U.S. Department of Energy (DOE) study to characterize beluga whalesmore » in Cook Inlet – Acoustic Monitoring of Beluga Whale Interactions with the Cook Inlet Tidal Energy Project (Project). ORPC Alaska, LLC, is a wholly-owned subsidiary of Ocean Renewable Power Company, LLC, (collectively, ORPC). ORPC is a global leader in the development of hydrokinetic power systems and eco-conscious projects that harness the power of ocean and river currents to create clean, predictable renewable energy. ORPC is developing a tidal energy demonstration project in Cook Inlet at East Foreland where ORPC has a Federal Energy Regulatory Commission (FERC) preliminary permit (P-13821). The Project collected baseline data to characterize pre-deployment patterns of marine mammal distribution, relative abundance, and behavior in ORPC’s proposed deployment area at East Foreland. ORPC also completed work near Fire Island where ORPC held a FERC preliminary permit (P-12679) until March 6, 2013. Passive hydroacoustic devices (previously utilized with bowhead whales in the Beaufort Sea) were adapted for study of beluga whales to determine the relative abundance of beluga whale vocalizations within the proposed deployment areas. Hydroacoustic data collected during the Project were used to characterize the ambient acoustic environment of the project site pre-deployment to inform the FERC pilot project process. The Project compared results obtained from this method to results obtained from other passive hydrophone technologies and to visual observation techniques performed simultaneously. This Final Report makes recommendations on the best practice for future data collection, for ORPC’s work in Cook Inlet specifically, and for tidal power projects in general. This Project developed a marine mammal study design and compared technologies for hydroacoustic and visual data collection with potential for broad application to future tidal and hydrokinetic projects in other geographic areas. The data collected for this Project will support the environmental assessment of future Cook Inlet tidal energy projects, including ORPC’s East Foreland Tidal Energy Project and any tidal energy developments at Fire Island. The Project’s rigorous assessment of technology and methodologies will be invaluable to the hydrokinetic industry for developing projects in an environmentally sound and sustainable way for areas with high marine mammal activity or endangered populations. By combining several different sampling methods this Project will also contribute to the future preparation of a comprehensive biological assessment of ORPC’s projects in Cook Inlet.« less

  10. A guide to FERC regulation and ratemaking of electric utilites and other power suppliers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Small, M.E.

    1994-12-31

    This book is very useful for its thorough survey of issues and cases pertinent to electric utility rate filings at the Federal Energy Regulatory Commission (FERC). As the author states, the book provides a step-by-step analysis of the statutory provisions, regulations and case law that are pertinent to the establishment of electric utility sales and transmission rates. The book takes a nuts and bolts approach to the examination of the ratemaking process for electric utilities. Three chapters cover in detail cost of service, rate of return, functionalization, classification and allocation, and rate design, issues which are at the heart ofmore » traditional cost of service ratemaking. Other chapters explain Title II of the Federal POwer Act and general rate filing procedures. Chapters 7 and 8 address the fuel adjustment clause and price squeeze, respectively. Chapters 9, 10, and 11 largely cover new developments in FERC policies since the previous edition of the book was published in 1989, including market based rates, QF certification issues and transmission issues. This volume is useful to the neophyte to electric utility regulation because of its comprehensiveness in addressing ratemaking issues. Also, it is useful to the seasoned practitioner because of its identification of pertinent case law.« less

  11. Benefits of Traditional Hydro to MHK and the Regulatory Process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Levine, Aaron

    Presentation discussing how traditional hydropower laws and regulations can be leveraged when developing marine and hydrokinetic projects as well as exceptions to FERC licensing for hydrokinetic projects.

  12. 75 FR 5309 - Combined Notice of Filings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-02-02

    .... Applicants: Granite State Gas Transmission, Inc. Description: Granite State Gas Transmission, Inc submits a new Fourth Revised Volume 1 of Granite State's FERC Gas Tariff. Filed Date: 01/15/2010. Accession...

  13. 75 FR 42733 - Combined Notice of Filings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... filings: Docket Numbers: RP10-896-000. Applicants: Granite State Gas Transmission, Inc. Description: Granite State Gas Transmission, Inc submits First Revised Sheet 15 et al. to FERC Gas Tariff, Fourth...

  14. 75 FR 62525 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    .... Docket Numbers: RP10-1400-000. Applicants: Chandeleur Pipe Line Company. Description: Chandeleur Pipe Line Company submits tariff filing per 154.203: Chandeleur Pipe Line Company Baseline FERC Gas Tariff...

  15. 78 FR 4406 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-22

    ... Carolina Electric & Gas Company For more information, contact Michael Lee, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502-8658 or Michael.Lee@ferc.gov . Dated: January...

  16. 78 FR 36183 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-06-17

    ... Electric & Gas Company For More Information Contact: Michael Lee, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502-8658 or Michael.Lee@ferc.gov . Dated: June 11, 2013...

  17. 75 FR 21289 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-23

    ...: 5 p.m. Eastern Time on Friday, April 30, 2010. Docket Numbers: ER10-468-002. Applicants: Google Energy LLC. Description: Google Energy LLC submits substitute FERC Electric Tariff, Volume No. 1. Filed...

  18. 78 FR 66350 - Commission Information Collection Activities (FERC-574); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-11-05

    ... State Commission is exercising that jurisdiction. 18 CFR Part 152 specifies the data required to be... Cost per FTE, including salary + benefits. Comments: Comments are invited on: (1) Whether the...

  19. 76 FR 9346 - Arkansas Oklahoma Gas Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-17

    ... points for each transaction. AOG requests waiver so that it can identify ``production pool'' as the... filing. \\1\\ Contract Reporting Requirements of Intrastate Natural Gas Companies, Order No. 735, 131 FERC...

  20. 76 FR 34974 - Cranberry Pipeline Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-15

    ... points for each transaction. Cranberry requests waiver so that it can identify ``production pool'' as the... filing. \\1\\ Contract Reporting Requirements of Intrastate Natural Gas Companies, Order No. 735, 131 FERC...

  1. 75 FR 57748 - Combined Notice of Filings No. 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-22

    ...: Cameron Interstate Pipeline, LLC. Description: Cameron Interstate Pipeline, LLC submits an eTariff XML...-mail FERCOnlineSupport@ferc.gov , or call (866) 208-3676 (toll free). For TTY, call (202) 502-8659...

  2. Transmission Pricing Issues for Electricity Generation From Renewable Resources

    EIA Publications

    1999-01-01

    This article discusses how the resolution of transmission pricing issues which have arisen under the Federal Energy Regulatory Commission's (FERC) open access environment may affect the prospects for renewable-based electricity.

  3. 75 FR 1761 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-13

    ..., January 14, 2010. Docket Numbers: ER07-357-006. Applicants: Fenton Power Partners I, LLC. Description: Fenton Power Partners, I, LLC submits Substitute Second Revised Sheet 4 et al. to FERC Electric Tariff...

  4. 78 FR 47310 - Commission Information Collection Activities (FERC-582); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-05

    ... energy in interstate commerce. Respondents (public utilities, power marketers) subject to these annual... charge. \\6\\ 18 CFR 381 and 382. Type of Respondents: Public utilities and power marketers. Estimate of...

  5. 77 FR 69614 - Commission Information Collection Activities (FERC-714); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-20

    ... to correlate rates and charges, assess reliability and other operating attributes in regulatory..., including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and...

  6. 77 FR 28869 - Notice of Commission Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-16

    ... Company. For more information, contact Valerie Martin, Office of Energy Market Regulation, Federal Energy Regulatory Commission at (202) 502- 6139 or Valerie.Martin@ferc.gov . Dated: May 10, 2012. Kimberly D. Bose...

  7. Analytical flaws and practical pitfalls: Reconsidering FERC`s merchant affiliate rules

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Santa, D.F. Jr.

    1998-11-01

    The merchant affiliate rules are a detriment not just to the regulated utility affiliate and its captive ratepayers, but even to competition in the wholesale bulk power market. The rationale underlying the merchant affiliate rules, their continued relevance, and, most importantly, their practical effect on both the utilities bound by such rules and the marketplace has not been seriously re-examined in the wake of the bulk power market`s rapid evolution. This article traces the development of the Commission`s merchant affiliate rules and reconsiders the rationale supporting the rules and the pivotal question of whether, in fact, such rules benefit utilitymore » ratepayers. The article concludes that in light of the analytical flaws and practical pitfalls surrounding the merchant affiliate rules, a balanced reevaluation of the Commission`s rules is in order.« less

  8. 76 FR 56429 - Sunshine Act Meeting Notice

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-13

    ..., Reliability, Security and Market Operations. A-3 OMITTED A-4 AD11-9-000 Report on Outages and Curtailments... is available through http://www.ferc.gov . Anyone with Internet access who desires to view this event...

  9. 78 FR 16494 - American Midstream (Louisiana Intrastate), LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... determining the appropriate action to be taken, but will not serve to make protestants parties to the... subscribed docket(s). For assistance with any FERC Online service, please email [[Page 16495

  10. 75 FR 61713 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-06

    .... Eastern Time on Tuesday, October 12, 2010. Docket Numbers: ER10-2801-000. Applicants: Dunkirk Power LLC. Description: Dunkirk Power LLC submits tariff filing per 35.12: Dunkirk Power--FERC Electric Tariff to be...

  11. 78 FR 49491 - Commission Information Collection Activities (FERC-574); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-14

    ... State Commission is exercising that jurisdiction. 18 CFR Part 152 specifies the data required to be..., including salary + benefits. Comments: Comments are invited on: (1) Whether the collection of information is...

  12. 75 FR 4550 - Empire Pipeline, Inc.; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-28

    .... submitted a request for a waiver of the reporting requirement to provide its certified public accountant...://www.ferc.gov , using the ``eLibrary'' link and is available for review in the Commission's Public...

  13. 76 FR 1428 - Empire Pipeline, Inc.; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-10

    .... submitted a request for a waiver of the reporting requirement to provide its certified public accountant...://www.ferc.gov , using the ``eLibrary'' link and is available for review in the Commission's Public...

  14. 77 FR 53878 - Commission Information Collection Activities (FERC-714); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-04

    ... reliability and other operating attributes in regulatory proceedings, monitor market trends and behaviors, and... or for a Federal agency. For further explanation of what is included in the information collection...

  15. 75 FR 20834 - Combined Notice of Filings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-21

    ... Time on Wednesday, April 21, 2010. Docket Numbers: RP10-594-000. Applicants: Garden Banks Gas Pipeline, LLC. Description: Garden Banks Gas Pipeline, LLC submits Fifth Revised Sheet 0 et al. to its FERC Gas...

  16. 75 FR 29336 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-05-25

    ... (VSL) assignments for Version 1 of the Critical Infrastructure Protection (CIP) Reliability Standards... Infrastructure Protection Reliability Standards, 130 FERC ] 61,211 at PP 23, 28, 31-33 (2010) (March 18 CIP VSL...

  17. 76 FR 53676 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-29

    ... Numbers: ER11-4041-001. Applicants: Verde Energy USA Trading, LLC. Description: Verde Energy USA Trading, LLC submits tariff filing per 35.17(b): Verde Energy FERC Application to be effective 8/17/2011. Filed...

  18. 75 FR 44781 - Commission Information Collection Activities (FERC-582); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-29

    ... ``Report/Form/ Annual Charges Report.'' Public utilities and power marketers subject to these annual... Commission issues bills for annual charges, and public utilities and power marketers then must pay the...

  19. 77 FR 30274 - The Commission's Role Regarding the Environmental Protection Agency's Mercury and Air Toxics...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-22

    ... (`FERC'), Regional Transmission Operators (`RTOs'), Independent System Operators (`ISOs') and other..., RTOs and ISOs, Planning Authorities, NERC and affiliated regional entities--and we encourage them to do...

  20. 77 FR 47623 - Sierra Pacific Power Company; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... NV Energy requested an accounting interpretation concerning the proper accounting treatment of an... submission of protests and interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov...

  1. Optimizing the U.S. Electric System with a High Penetration of Renewables

    NASA Astrophysics Data System (ADS)

    Corcoran, B. A.; Jacobson, M. Z.

    2013-12-01

    As renewable energy generators are increasingly being installed throughout the U.S., there is growing interest in interconnecting diverse renewable generators (primarily wind and solar) across large geographic areas through an enhanced transmission system. This reduces variability in the aggregate power output, increases system reliability, and allows for the development of the best overall group of renewable technologies and sites to meet the load. Studies are therefore needed to determine the most efficient and economical plan to achieve large area interconnections in a future electric system with a high penetration of renewables. This research quantifies the effects of aggregating electric load together with diverse renewable generation throughout the ten Federal Energy Regulatory Commission (FERC) regions in the contiguous U.S. A deterministic linear program has been built in AMPL (A Mathematical Programming Language) to solve for the least-cost organizational structure and system (generators, transmission, and storage) for a highly renewable electric grid. The analysis will 1) examine a highly renewable 2006 electric system, including various sensitivity cases and additional system components such as additional load from electric vehicles, and 2) create a 'roadmap' from the existing 2006 system to a highly renewable system in 2030, accounting for projected price and demand changes and generator retirements based on age and environmental regulations. Ideally, results from this study will offer insight for a federal renewable energy policy (such as a renewable portfolio standard) and how to best organize U.S. regions for transmission planning.

  2. 77 FR 66609 - Notice of FERC Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ... El Paso Electric Company ER13-91-000 Black Hills Power, Inc., et al......... ER13-96-000 Black Hills... ongoing outreach efforts. The meeting may discuss matters at issue in the above captioned dockets. For...

  3. 78 FR 16497 - Notice of FERC Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-15

    ... Electric Company ER13-91-000 Black Hills Power, Inc., et al ER13-96-000 Black Hills Colorado Electric... of the Commission's ongoing outreach efforts. The meeting may discuss matters at issue in the above...

  4. 77 FR 74844 - Notice of FERC Staff Attendance

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-18

    ............ Docket No. ER13-91-000. Black Hills Power, Inc., et al... Docket No. ER13-96-000. Black Hills Colorado... Commission's ongoing outreach efforts. The meeting may discuss matters at issue in the above captioned...

  5. 75 FR 47804 - Commission Information Collection Activities (FERC-574); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-09

    ... Commission; and (d) that such State Commission is exercising that jurisdiction. The data required to be filed... in support of its mission. These costs apply to activities which benefit the whole organization...

  6. 18 CFR 141.1 - FERC Form No. 1, Annual report of Major electric utilities, licensees and others.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... instrumentality engaged in generation, transmission, distribution, or sale of electric energy, however produced... the business of developing, transmitting, utilizing, or distributing power). (2) When to file and what...

  7. 18 CFR 141.1 - FERC Form No. 1, Annual report of Major electric utilities, licensees and others.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... instrumentality engaged in generation, transmission, distribution, or sale of electric energy, however produced... the business of developing, transmitting, utilizing, or distributing power). (2) When to file and what...

  8. 18 CFR 141.1 - FERC Form No. 1, Annual report of Major electric utilities, licensees and others.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... instrumentality engaged in generation, transmission, distribution, or sale of electric energy, however produced... the business of developing, transmitting, utilizing, or distributing power). (2) When to file and what...

  9. 18 CFR 141.1 - FERC Form No. 1, Annual report of Major electric utilities, licensees and others.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... instrumentality engaged in generation, transmission, distribution, or sale of electric energy, however produced... the business of developing, transmitting, utilizing, or distributing power). (2) When to file and what...

  10. 18 CFR 385.2010 - Service (Rule 2010).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Commission. (2) The certificate of service must conform to the following format: I hereby certify that I have... public in hard copy upon request and through the Commission's web site at http://www.ferc.gov. (4) Any...

  11. 43 CFR 45.42 - When must a party supplement or amend information it has previously provided?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... the Interior CONDITIONS AND PRESCRIPTIONS IN FERC HYDROPOWER LICENSES Hearing Process Prehearing... it learns that the response: (1) Was incomplete or incorrect when made; or (2) Though complete and...

  12. 76 FR 52647 - Commission Information Collection Activities (FERC-583); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-23

    ... government dams. The Commission implements theses filing requirements in the Code of Federal Regulations (CFR... information on those who are to respond, including the use of appropriate automated, electronic, mechanical...

  13. 78 FR 5794 - Occidental Chemical Corporation v. Midwest Independent Transmission System Operator, Inc.; Notice...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-28

    ..., violates the Public Utility Regulatory Policies Act of 1978 (PURPA) and the Commission's implementing... rights under PURPA and FERC's implementing regulations and find that the MISO QF Integration Plan is...

  14. 77 FR 3758 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ...: Attachment H Schedule 7 Compliance Filing to be effective 6/1/2011. Filed Date: 1/13/12. Accession Number... filings: Docket Numbers: QF12-159-000. Applicants: City of Kinston, NC. Description: FERC Form 556 of City...

  15. 75 FR 50760 - Crosstex LIG, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-17

    ..., clarify the nature in which certain gas accounting will be managed, and to change certain situational... interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov . Persons unable to file...

  16. 76 FR 59669 - Notice of Commission Information Collection Activities (FERC-519); Comment Request; Extension...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-09-27

    ... (rounded). \\1\\ Number of hours an employee works each year. \\2\\ Average annual salary per employee... salary per employee (including overhead). Dated: September 19, 2011. Kimberly D. Bose, Secretary. [FR Doc...

  17. 77 FR 77069 - Commission Information Collection Activities (FERC-730); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-31

    ... reliability and to reduce the cost of delivered power by reducing transmission congestion. Order No. 679 also... information, including the validity of the methodology and assumptions used; (3) ways to enhance the quality...

  18. 77 FR 28591 - Combined Notice of Filings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-15

    ... Due: 5 p.m. ET 5/21/12. Docket Numbers: RP12-728-000. Applicants: Leaf River Energy Center LLC. Description: Leaf River Energy Center LLC--Proposed Revisions to FERC Gas Tariff to be effective 6/7/2012...

  19. 76 FR 53453 - Environmental Impacts Statements; Notice of Availability

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-08-26

    .../2011, Contact: Sharon Seim 907-456-0501. EIS No. 20110273, Final EIS, FERC, CA, Kilarc-Cow Creek... Creek and South Cow Creek, Shasta County, CA, Wait Period Ends: 09/26/2011, Contact: Leonard Tao 1-866...

  20. 75 FR 35782 - Combined Notice of Filings No 2

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-23

    ... Marketing, Inc. Filed Date: 06/04/2010. Accession Number: 20100604-0205. Comment Date: 5 p.m. Eastern Time... notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service...

  1. Not according to the high court, Professor Wolak

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Falk, Jonathan

    2008-08-15

    The FERC and its powers and actions related to ''just and reasonable'' prices are discussed in the aftermath of the California crisis. The decision in the case Morgan Stanley Capital Group Inc. v. Public Utility District No. 1 of Snohomish County et al. is addressed. The author concludes, FERC has an absolutely vital role to play in fulfilling its obligations under the FPA and in fostering a system that creates ''just and reasonable'' prices. It must certify markets that will be sufficiently competitive to allow market prices to become set. It must continually monitor those markets to ensure that competitivemore » conditions are met. It must enforce prohibitions against fraud and market manipulation. But if it does those things, it is entitled under the FPA to certify the prices thus generated as ''just and reasonable.'' And the justification is the long-run welfare of consumers, exactly the group the FPA was enacted to protect.« less

  2. 78 FR 46177 - Third-Party Provision of Ancillary Services; Accounting and Financial Reporting for New Electric...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-07-30

    ...The Federal Energy Regulatory Commission (Commission) is revising its regulations to foster competition and transparency in ancillary services markets. The Commission is revising certain aspects of its current market-based rate regulations, ancillary services requirements under the pro forma open-access transmission tariff (OATT), and accounting and reporting requirements. Specifically, the Commission is revising its regulations to reflect reforms to its Avista policy governing the sale of ancillary services at market-based rates to public utility transmission providers. The Commission is also requiring each public utility transmission provider to add to its OATT Schedule 3 a statement that it will take into account the speed and accuracy of regulation resources in its determination of reserve requirements for Regulation and Frequency Response service, including as it reviews whether a self-supplying customer has made ``alternative comparable arrangements'' as required by the Schedule. The final rule also requires each public utility transmission provider to post certain Area Control Error data as described in the final rule. Finally, the Commission is revising the accounting and reporting requirements under its Uniform System of Accounts for public utilities and licensees and its forms, statements, and reports, contained in FERC Form No. 1, Annual Report of Major Electric Utilities, Licensees and Others, FERC Form No. 1-F, Annual Report for Nonmajor Public Utilities and Licensees, and FERC Form No. 3-Q, Quarterly Financial Report of Electric Utilities, Licensees, and Natural Gas Companies, to better account for and report transactions associated with the use of energy storage devices in public utility operations.

  3. Riverbed-Sediment Mapping in the Edwards Dam Impoundment on the Kennebec River, Maine By Use of Geophysical Techniques

    USGS Publications Warehouse

    Dudley, Robert W.

    1999-01-01

    INTRODUCTION In July 1997, the Federal Energy Regulatory Commission (FERC) issued a Final Environmental Impact Statement recommending that the 162-year-old Edwards Dam on the Kennebec River in Augusta, Maine, be removed. The impoundment formed by Edwards Dam extends about 15 mi to the city of Waterville, near the confluence of the Sebasticook River with the Kennebec River. The impoundment has a surface area of 1,143 acres, a gross storage of approximately 740 million ft3, and a usable storage of about 184 million ft3 (Stone and Webster, 1995a). According to FERC, removal of the 917-ft-long, 24-ft-high timber crib and concrete structure would restore 15 mi of riverine habitat, improve passage of ocean-migrating fish species native to the Kennebec River, and result in substantial recreational enhancements (Federal Energy Regulatory Commission, 1997). Because the removal of Edwards Dam would change the hydraulic characteristics of the river in the present-day impoundment, the potential transport of erodible, fine-grained sediment currently in the impoundment is a concern. Of particular concern is the erosion and transport of this sediment to areas downstream from the dam, a process that could introduce possible bacterial and chemical contamination and could impede river navigation as a result of sediment deposition. In an effort to build upon available information on the composition of the riverbed, the U.S. Geological Survey (USGS), in cooperation with the Maine State Planning Office, classified riverbed sediment types and mapped their areal extents in the lower (southern) half of the Edwards Dam impoundment. This report describes the methods used to collect and analyze the data used to create a map of sediment types in the Edwards Dam impoundment. The map is included with this report. Data used to map riverbed sediment types were also used to estimate the volume of observed mud and mud-containing sediment in the study area.

  4. 75 FR 70219 - Commission Information Collection Activities (FERC-574); Comment Request; Submitted for OMB Review

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-11-17

    ... exercising that jurisdiction. The data required to be filed by pipeline companies for an exemption are... activities which benefit the whole organization rather than any one particular function or activity. Comments...

  5. 30 CFR 285.637 - When may I commence commercial operations on my commercial lease?

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... INTERIOR OFFSHORE RENEWABLE ENERGY ALTERNATE USES OF EXISTING FACILITIES ON THE OUTER CONTINENTAL SHELF... require a FERC license (i.e., wind), then you may commence commercial operations 30 days after the CVA or...

  6. 18 CFR 34.4 - Required exhibits.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... Cash Flows and Computation of Interest Coverage on an actual basis and a pro forma basis for the most... Cash Flows must be in the form prescribed for the “Statement of Cash Flows” of the FERC Form No. 1...

  7. 18 CFR 34.4 - Required exhibits.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... Cash Flows and Computation of Interest Coverage on an actual basis and a pro forma basis for the most... Cash Flows must be in the form prescribed for the “Statement of Cash Flows” of the FERC Form No. 1...

  8. 18 CFR 34.4 - Required exhibits.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... Cash Flows and Computation of Interest Coverage on an actual basis and a pro forma basis for the most... Cash Flows must be in the form prescribed for the “Statement of Cash Flows” of the FERC Form No. 1...

  9. 18 CFR 34.4 - Required exhibits.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... Cash Flows and Computation of Interest Coverage on an actual basis and a pro forma basis for the most... Cash Flows must be in the form prescribed for the “Statement of Cash Flows” of the FERC Form No. 1...

  10. 18 CFR 34.4 - Required exhibits.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... Cash Flows and Computation of Interest Coverage on an actual basis and a pro forma basis for the most... Cash Flows must be in the form prescribed for the “Statement of Cash Flows” of the FERC Form No. 1...

  11. 75 FR 38808 - Questar Overthrust Pipeline Company; Notice of Availability of the Environmental Assessment for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-06

    ... for the Proposed Mainline 133 Loop Expansion Project June 25, 2010. The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the Mainline 133...

  12. 78 FR 64935 - Borough of Ellwood City, Pennsylvania; Notice of Preliminary Determination of a Qualifying...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-30

    ..., P.E., Hill Engineering, 8 Gibson Street, North East, PA 16428, Phone No. (814) 725-8659. FERC... agricultural, municipal, or industrial consumption and not primarily for the generation of electricity. [[Page...

  13. 77 FR 47623 - Entergy Gulf States Louisiana, LLC; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-08-09

    ... correct a proposed accounting error related to its past practice of deferring certain income tax items... submission of protests and interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov...

  14. 30 CFR 291.104 - Who may file a complaint or a third-party brief?

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... ENFORCEMENT, DEPARTMENT OF THE INTERIOR APPEALS OPEN AND NONDISCRIMINATORY ACCESS TO OIL AND GAS PIPELINES... been denied open and nondiscriminatory access to an OCSLA pipeline that is not a FERC pipeline. (b) Any...

  15. 78 FR 27962 - Archon Energy 1, Inc.; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-13

    ... Kaplan turbine and generator; and (4) appurtenant facilities. The proposed project would have a total..., Tampa, Florida 33602, phone: (403) 618-2018. FERC Contact: Corey Vezina; phone: (202) 502-8598, email...

  16. 77 FR 28370 - Commission Information Collection Activities (FERC-545); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-14

    ... Issues (e.g. 15 2 30 7,500 225,000 Compliance, Cost of Service)... Reports (Informational Filings). 47 2... of information technology. Dated: May 7, 2012. Kimberly D. Bose, Secretary. [FR Doc. 2012-11578 Filed...

  17. 77 FR 2973 - PPL Electric Utilities Corporation; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-20

    ... base, subject to the use of appropriate accounting methodologies to prevent double recovery. Any person... interventions in lieu of paper using the ``eFiling'' link at http://www.ferc.gov . Persons unable to file...

  18. 77 FR 60426 - FFP Project 65 LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-03

    ... lands or waters owned by others without the owners' express permission. The proposed Jackson Point...-1531. FERC Contact: Michael Spencer, (202) 502-6093. Deadline for filing comments, motions to intervene...

  19. 75 FR 63468 - Notice of Revocation of Market-Based Rate Tariff

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-15

    ... market-based rate tariffs. \\1\\ Electric Quarterly Reports, 132 FERC ] 61,251 (2010) (September 22 Order.... Kimberly D. Bose, Secretary. [FR Doc. 2010-25955 Filed 10-14-10; 8:45 am] BILLING CODE 6717-01-P ...

  20. 77 FR 9229 - Green Island Power Authority; Notice of Meeting and Teleconference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-16

    ..., Room 62-26. c. FERC Contact: Tom Dean, (202) 502-6041. d. Purpose of Meeting: To discuss authorizations... other interested parties are invited to participate either in person or by phone. Please call Tom Dean...

  1. 78 FR 54885 - Union Electric Company (dba Ameren Missouri); Notice of Availability of Final Environmental...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... projects. For assistance, contact FERC Online Support. For further information, please contact Janet Hutzel by telephone at (202) 502-8675, or by email at janet[email protected] . Dated: August 29, 2013...

  2. 75 FR 62518 - Northern Illinois Hydropower, LLC; Notice of Application Ready for Environmental Analysis and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-12

    ... Hydropower, LLC, 801 Oakland Avenue, Joliet, IL 60435, (312) 320-1610. i. FERC Contact: Janet Hutzel, (202) 502-8675 or janet[email protected] . j. Deadline for filing comments, recommendations, terms and...

  3. 77 FR 66609 - Notice of FERC Staff Attendance; PacifiCorp, et al.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-11-06

    ...-82-000 El Paso Electric Company ER13-91-000 Black Hills Power, Inc., et al......... ER13-96-000 Black... Commission's ongoing outreach efforts. The meeting may discuss matters at issue in the above captioned...

  4. 76 FR 38382 - William Arkoosh; Notice of Intent To File License Application, Filing of Pre-Application Document...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-30

    ... address in paragraph h. m. Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be....3 of the Commission's regulations. h. Potential Applicant Contact: William Arkoosh, 2005 Highway 26...

  5. 50 CFR 221.42 - When must a party supplement or amend information it has previously provided?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... PRESCRIPTIONS IN FERC HYDROPOWER LICENSES Hearing Process Prehearing Conferences and Discovery § 221.42 When... promptly supplement or amend any prior response to a discovery request if it learns that the response: (1...

  6. 78 FR 1853 - EH California Hydro, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-09

    ... tailrace. Applicant Contact: Mr. John R. Collins, EH California Hydro, LLC, 5425 Wisconsin Avenue, Suite 600, Chevy Chase, Maryland 20815; phone: (301) 718-4433. FERC Contact: Jim Fargo at [email protected

  7. 77 FR 76015 - Prior Notice of Activity Under Blanket Certificate; Dominion Transmission, Inc.

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-12-26

    ... Dominion's authorization in Docket No. CP88-712-000, 52 FERC ]61,112 (1990) for authority to replace TL-465... pipeline to meet Class 3 design requirements, as more fully detailed in the Application. Questions...

  8. 78 FR 48670 - Boulder Canyon Project

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-09

    ... DEPARTMENT OF ENERGY Western Area Power Administration Boulder Canyon Project AGENCY: Western Area... Canyon Project (BCP) electric service provided by the Western Area Power Administration (Western). The... States Department of Energy, Western Area Power Administration, Boulder Canyon Project, 133 FERC ] 62,229...

  9. 75 FR 35007 - Portland Water Bureau; Notice of Application Accepted for Filing and Soliciting Comments, Motions...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-21

    .... Bryan Robinson, City of Portland Water Bureau, 1900 N. Interstate, Portland, OR 97227; (503) 823-7221; [email protected] . i. FERC Contact: Kelly Houff, (202) 502-6393, Kelly[email protected] . j. Status...

  10. 7 CFR 1.610 - Who may represent a party, and what requirements apply to a representative?

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... ADMINISTRATIVE REGULATIONS Conditions in FERC Hydropower Licenses Hearing Process § 1.610 Who may represent a... may either represent himself or herself in the hearing process under this subpart or authorize an...

  11. 75 FR 32459 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-06-08

    ... accordingly. \\2\\ 18 CFR 4.37 (2009). See, e.g., BPUS Generation Development, LLC, 126 FERC ] 61,132 (2009). On... drawing. Kimberly D. Bose, Secretary. [FR Doc. 2010-13559 Filed 6-7-10; 8:45 am] BILLING CODE 6717-01-P ...

  12. 76 FR 4894 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ..., LLC, 126 FERC ] 61,132 (2009). On January 27, 2011, at 10 a.m. (eastern time), the Secretary of the... the results of the drawing. Kimberly D. Bose, Secretary. [FR Doc. 2011-1712 Filed 1-26-11; 8:45 am...

  13. 76 FR 4894 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ... Development, LLC, 126 FERC ] 61,132 (2009). On January 27, 2011, at 10 a.m. (Eastern Time), the Secretary of... announcing the results of the drawing. Kimberly D. Bose, Secretary. [FR Doc. 2011-1721 Filed 1-26-11; 8:45 am...

  14. 76 FR 4893 - Notice Announcing Preliminary Permit Drawing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-27

    ..., LLC, 126 FERC ] 61,132 (2009). On January 27, 2011, at 10 a.m. (eastern time), the Secretary of the... the results of the drawing. Kimberly D. Bose, Secretary. [FR Doc. 2011-1718 Filed 1-26-11; 8:45 am...

  15. 75 FR 52527 - New York Independent System Operator, Inc. Notice of Filings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-08-26

    ... Compliance Filing, New York Independent System Operator, Inc., 132 FERC 61,031 (July 15, 2010). Any person.... Kimberly D. Bose, Secretary. [FR Doc. 2010-21167 Filed 8-25-10; 8:45 am] BILLING CODE 6717-01-P ...

  16. 75 FR 10232 - Pacific Gas and Electric Company; Notice of Application for Amendment of License, Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-05

    ... California Department of Fish and Game. The Restoration Project will reestablish approximately 42 miles of.... You may also register online at http://www.ferc.gov/docsfiling/esubscription.asp to be notified via e...

  17. 78 FR 78353 - NuStar Crude Oil Pipeline L.P.; Notice of Petiton for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-12-26

    ... transport additional Eagle Ford shale crude. Among other things, NuStar seeks approval of its transportation... Online links at http://www.ferc.gov . To facilitate electronic service, persons with Internet access who...

  18. 77 FR 63811 - Notice of Commissioners and Staff Attendance at FERC Author Speaker Series Event

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-17

    ...: Author Speaker Series featuring Daniel Yergin: 888 First Street NE., Washington, DC 20426. October 30, 2012 (10:00 a.m.-12:00 p.m.) The event will feature Pulitzer Prize winning author, Daniel Yergin...

  19. 78 FR 2393 - CAlifornians for Renewable Energy, Inc., Michael E. Boyd, Robert M. Sarvey v. California Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-11

    ... considered by the Commission in determining the appropriate action to be taken, but will not serve to make... assistance with any FERC Online service, please email [email protected] , or call [[Page 2394

  20. 75 FR 354 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-05

    ..., 2009. Take notice that the Commission received the following electric rate filings: Docket Numbers...: Iberdrola Renewables, Inc et al. submit Original Sheet 1 to FERC Electric Tariff, Third Revised Volume 1... Maine Power Company. Description: Central Maine Power Company submits executed Engineering and...

  1. 33 CFR 320.3 - Related laws.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... determined by the Secretary charged with its administration. (m) The Ocean Thermal Energy Conversion Act of... of NOAA for the ownership, construction, location, and operation of ocean thermal energy conversion... Energy Regulatory Agency (FERC) to issue licenses for the construction and the operation and maintenance...

  2. 75 FR 81157 - Version One Regional Reliability Standard for Transmission Operations

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-12-27

    ... processing software should be filed in native applications or print-to-PDF format and not in a scanned format..., Inc. v. FERC, 564 F.3d 1342 (D.C. Cir. 2009). \\3\\ NERC designates the version number of a Reliability...

  3. 76 FR 36528 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-06-22

    ...: Dominion Energy Marketing, Inc., Dominion Nuclear Connecticut, Inc., Dominion Energy Kewaunee, Inc... filings, the notices of self-certification [or self-recertification] listed above, do not institute a... encourages electronic submission of protests and interventions in lieu of paper, using the FERC Online links...

  4. 76 FR 4651 - Gresham Municipal Utilities; Notice of Intent To File License Application, Filing of Pre...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-01-26

    ... Red Lake Dam Hydroelectric Project. f. Location: On Red River in Shawano County, Wisconsin. No federal... Reference Room or may be viewed on the Commission's Web site ( http://www.ferc.gov ), using the ``eLibrary...

  5. 76 FR 62804 - Duke Energy Carolinas, LLC; Notice of Meetings To Discuss Resource Issues Related to the...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-10-11

    ... 29607. \\*\\ Registration is required. Please see item g. below. c. FERC Contact: Stephen Bowler at (202) 505-6861 or stephen[email protected] . d. Purpose of Meetings: Duke is holding regular meetings of its...

  6. 77 FR 31349 - Coastal Hydropower, LLC; Notice of Preliminary Permit Application Accepted for Filing and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-05-25

    ...-Reynolds at (202) 502-6618, or via email at bryan.roden-reynolds@ferc.gov . Deadline for filing comments.../docs-filing/elibrary.asp . Enter the docket number (P-14385) in the docket number field to access the...

  7. 50 CFR 221.71 - How do I propose an alternative?

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Section 221.71 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE MARINE MAMMALS PRESCRIPTIONS IN FERC HYDROPOWER LICENSES Alternatives...) Energy supply, distribution, cost, and use; (ii) Flood control; (iii) Navigation; (iv) Water supply; (v...

  8. 50 CFR 221.71 - How do I propose an alternative?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Section 221.71 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE MARINE MAMMALS PRESCRIPTIONS IN FERC HYDROPOWER LICENSES Alternatives...) Energy supply, distribution, cost, and use; (ii) Flood control; (iii) Navigation; (iv) Water supply; (v...

  9. 50 CFR 221.71 - How do I propose an alternative?

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Section 221.71 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE MARINE MAMMALS PRESCRIPTIONS IN FERC HYDROPOWER LICENSES Alternatives...) Energy supply, distribution, cost, and use; (ii) Flood control; (iii) Navigation; (iv) Water supply; (v...

  10. 50 CFR 221.71 - How do I propose an alternative?

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Section 221.71 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE MARINE MAMMALS PRESCRIPTIONS IN FERC HYDROPOWER LICENSES Alternatives...) Energy supply, distribution, cost, and use; (ii) Flood control; (iii) Navigation; (iv) Water supply; (v...

  11. 50 CFR 221.71 - How do I propose an alternative?

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Section 221.71 Wildlife and Fisheries NATIONAL MARINE FISHERIES SERVICE, NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION, DEPARTMENT OF COMMERCE MARINE MAMMALS PRESCRIPTIONS IN FERC HYDROPOWER LICENSES Alternatives...) Energy supply, distribution, cost, and use; (ii) Flood control; (iii) Navigation; (iv) Water supply; (v...

  12. 77 FR 6552 - Mahoning Hydropower, LLC; Notice of Intent To File License Application, Filing of Pre-Application...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-02-08

    ... address in paragraph h. m. Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be...: 18 CFR 5.3 of the Commission's regulations. h. Potential Applicant Contact: Anthony Marra, Mahoning...

  13. 78 FR 61983 - Commission Information Collection Activities (FERC-555); Comment Request; Extension

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-10-09

    ...;and investigations, committee meetings, agency decisions and rulings, #0;delegations of authority... Accounting Issuance providing guidance on records storage media. More specifically, the Commission gave each... or eliminate burdensome and unnecessary regulatory requirements. The Commission is not making any...

  14. 78 FR 30916 - CenterPoint Energy Bakken Crude Services, LLC; Notice of Petition for Declaratory Order

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-05-23

    ... it to an interconnection with Great Northern Gathering and Marketing, L.L.C.'s Watford Terminal... notification when a document is added to a subscribed docket(s). For assistance with any FERC Online service...

  15. 78 FR 3893 - Enbridge Energy, Limited Partnership; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-01-17

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. IS13-17-000] Enbridge Energy... Energy, Limited Partnership's proposed revision to its downstream Nomination Verification Procedure. \\1\\ Enbridge Energy, Limited Partnership, 141 FERC ] 61,246 (2012). Take notice that a technical conference...

  16. 78 FR 18333 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... Electric Reliability Corporation; Notice of Filing Take notice that on March 11, 2013, the North American Electric Reliability Corporation and SERC Reliability Corporation submitted a compliance filing in accordance with the Federal Energy Regulatory Commission's Order (FERC or Commission) in Regional Reliability...

  17. 75 FR 54063 - Demand Response Compensation in Organized Wholesale Energy Markets; Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-09-03

    ... FURTHER INFORMATION CONTACT: David Hunger (Technical Information), Office of Energy Policy and Innovation....hunger@ferc.gov . Caroline Daly (Technical Information), Office of Energy Policy and [[Page 54064... information about the technical conference or comment procedures, please contact: David Hunger (Technical...

  18. 75 FR 1767 - Combined Notice of Filings

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-01-13

    ..., 2009. Take notice that the Commission has received the following Natural Gas Pipeline Rate and Refund... Pipeline Company submits Second Substitute Eighth Revised Sheet 8 to its FERC Gas Tariff, First Revised... Shore Natural Gas Company. Description: Eastern Shore Natural Gas Company submits the corrected...

  19. 75 FR 17703 - Combined Notice of Filings # 1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-07

    ...: Southwest Power Pool, Inc submits Substitute Sixth Revised Sheet 14 et al to its FERC Electric Tariff, Fifth...: Central Maine Power Company. Description: Central Maine Power Company submits Engineering and Procurement.... Docket Numbers: ER10-911-001. Applicants: Wisconsin Electric Power Company. Description: Wisconsin...

  20. 75 FR 18195 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... LLC. Description: Juniper Canyon Wind Power LLC submits FERC Electric Taiff, Original Volume No. 1..., 2010. Take notice that the Commission received the following electric rate filings: Docket Numbers: ER10-374-001. Applicants: Medicine Bow Power Partners, LLC. Description: Withdrawal of Request for...

  1. 75 FR 65625 - Osprey II, LLC; Notice of Preliminary Permit Application Accepted for Filing and Soliciting...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-10-26

    ... study the feasibility of the 649 Water Street Project to be located on the Cobbosseecontee Stream, in.... Applicant Contact: Hoon Won, 275 River Road, P.O. Box 202, Woolwich, ME 04579; (203) 340-2517. FERC Contact...

  2. Transmission Infrastructure | Energy Analysis | NREL

    Science.gov Websites

    aggregating geothermal with other complementary generating technologies, in renewable energy zones infrastructure planning and expansion to enable large-scale deployment of renewable energy in the future. Large Energy, FERC, NERC, and the regional entities, transmission providers, generating companies, utilities

  3. 77 FR 3752 - Commission Information Collection Activities (FERC-725I); Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-01-25

    ... the Bulk-Power System to system disturbances, including scheduled and unscheduled outages; requires each reliability coordinator to establish requirements for its area's dynamic disturbance recording... Retention--10.... 10 acquisition and installation of dynamic disturbance recorders. GO, TO, and RC to...

  4. 75 FR 41858 - Notice of Termination of License by Implied Surrender and Soliciting Comments, Protests, and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-19

    ...,000-kVA transformer, and a 70-foot-long, 15-kV transmission line; (6) a tailrace; and (7) other... Hydro Electric Company (Roosevelt Hydro). 16 FERC ] 62,040 (1981). The project has not operated since...

  5. 76 FR 42534 - Mandatory Reliability Standards for Interconnection Reliability Operating Limits; System...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-07-19

    ... Reliability Operating Limits; System Restoration Reliability Standards AGENCY: Federal Energy Regulatory... data necessary to analyze and monitor Interconnection Reliability Operating Limits (IROL) within its... Interconnection Reliability Operating Limits, Order No. 748, 134 FERC ] 61,213 (2011). \\2\\ The term ``Wide-Area...

  6. 77 FR 58372 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-09-20

    .... Docket Numbers: ER12-2621-000. Applicants: Wolverine Power Supply Cooperative, Inc. Description: Wolverine Power Supply Cooperative, Inc. submits tariff filing per 35: Re-File -Amend Filing FERC Rate...-2200-002; ER12-1716-001. Applicants: Noble Americas Gas & Power Corp., Noble Americas Energy Solutions...

  7. 75 FR 18496 - Notice of Complaint Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-12

    ... marketing LLC, Connecticut Jet Power LLC, Devon Power LLC, Middletown Power LLC, Montville Power LLC... Resources & Trade, LLC, PSEG Power Connecticut LLC, NRG Power marketing LLC, Connecticut Jet Power LLC... subscribed docket(s). For assistance with any FERC Online service, please e-mail [email protected

  8. 75 FR 12740 - Wyoming Interstate Company, Inc.; Notice of Technical Conference

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-17

    ... additional technical, engineering, and operational support for its proposed gas quality allocation procedures... should be prepared to support its position with adequate technical, engineering, and operational information. FERC conferences are accessible under section 508 of the Rehabilitation Act of 1973. For...

  9. 75 FR 17407 - Energy Efficiency of the Natural Gas Infrastructure and Operations Conference; Notice of Public...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-06

    ... available through http://www.ferc.gov . Anyone with Internet access who desires to view this event can do so... for the free Webcasts. It also offers access to this event via television in the Washington, DC area...

  10. 75 FR 16094 - Upper Peninsula Power Company; North American Hydro Holdings, LLC; Notice of Application for...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-03-31

    ... 18 CFR 385.2001(a)(1)(iii)(2008) and the instructions on the Commission's website under the ``e...://www.ferc.gov/docs-filing/elibrary.asp . Enter the docket number (P-10856-079) in the docket number...

  11. 76 FR 9768 - Public Utility District No. 1 Chelan County; Notice of Application for Amendment of License and...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2011-02-22

    ... is located on the Chelan River in Chelan County near the City of Chelan, Washington. g. Filed... Compliance Manager at P.O. Box 1231, Wenatchee, Washington. Phone: (509) 663-8121. i. FERC Contact: Patricia...

  12. Power and transmission rate orders and related documents. Office of Power Marketing Coordination, data compiled January 1, 1980-December 31, 1981

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    This publication contains the power and transmission rate orders and related documents issued by the Department of Energy. It covers calendar years 1980 and 1981. The first publication, DOE/CE-007 covering the period from March through December 1979, was published July 1981. This publication is a compilation of all rate orders issued by the Assistant Secretary for Resource Applications and the Assistant Secretary for Conservation and Renewable Energy during calendar years 1980 and 1981 under Delegation Order No. 0204-33. It also includes all final approvals, remands, and disapprovals by the FERC, and a petition to the FERC for reconsideration by amore » Power Marketing Administration during 1980 and 1981. Also included are two delegation orders along with an amendment and a supplement to one delegation order, a departmental order on financial reporting, and Power and Transmission Rate Adjustment Procedures relating to federal power marketing.« less

  13. Public Utility Commission manual for Section 210 of PURPA for Vermont

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Public Utility Regulatory Policies Act of 1978 (PURPA) places obligations on both electric utilities and state regulatory commissions. PURPA requires every electric utility to purchase all energy and capacity made available to it, by a qualifying facility, and to sell energy and capacity to a qualifying facility upon the qualifying facility's request. State regulatory commissions must implement and administer these utility obligations and other requirements that were implemented by the Federal Energy Regulatory Commission's (FERC) final rules, which became effective March 20, 1981, and must set fair rates for electric power purchases and sales between utilities and small powermore » producers. This manual provides a concise, annotated explanation of the final FERC rules, a description of federal and state statutory authorizations, court challenges to these authorizations, analysis of the relationship between federal and state laws, analysis of Vermont's implementation of section 210 of PURPA and for comparison, annotations of selected state regulatory authority decisions.« less

  14. Public Utility Commission manual for Section 210 of PURPA for Montana

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Public Utility Regulatory Policies Act of 1978 (PURPA) places obligations on both electric utilities and state regulatory commissions. PURPA requires every electric utility to purchase all energy and capacity made available to it, by a qualifying facility, and to sell energy and capacity to a qualifying facility upon the qualifying facility's request. State regulatory commissions must implement and administer these utility obligations and other requirements that were implemented by the Federal Energy Regulatory Commission's (FERC) final rules, which became effective March 20, 1981; and must set fair rates for electric power purchases and sales between utilities and small powermore » producers. This manual provides a concise, annotated explanation of the final FERC rules, a description of federal and state statutory authorizations, court challenges to these authorizations analysis of the relationship between federal and state laws, analysis of Montana's implementation of section 210 of PURPA and for comparison, annotations of selected state regulatory authority decisions.« less

  15. Public Utility Commission manual for Section 210 of PURPA for Arkansas

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    The Public Utility Regulatory Policies Act of 1978 (PURPA) places obligations on both electric utilities and state regulatory commissions. PURPA requires every electric utility to purchase all energy and capacity made available to it, by a qualifying facility, and to sell energy and capacity to a qualifying facility upon the qualifying facility's request. State regulatory commissions must implement and administer these utility obligations and other requirements that were implemented by the Federal Energy Regulatory Commission's (FERC) final rules, which became effective March 20, 1981; and must set fair rates for electric power purchases and sales between utilities and small powermore » producers. This manual provides a concise, annotated explanation of the final FERC rules, a description of federal and state statutory authorizations, court challenges to these authorizations, analysis of the relationship between federal and state laws, analysis of Arkansas' implementation of section 210 of PURPA and for comparison, annotations of selected state regulatory authority decisions.« less

  16. 77 FR 25159 - Combined Notice of Filings #1

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-04-27

    ... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings 1 Take notice that the Commission received the following exempt wholesale generator filings: Docket Numbers: EG12-59.... Description: Copper Mountain Solar 2 LLC FERC Electric Tariff No. 1 Market-Based Rates Tariff to be effective...

  17. 75 FR 18202 - Notice of Indo-U.S. Regulatory Workshop

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-04-09

    ... regulatory challenges faced by commissioners from both nations. The FERC Commissioners, along with other... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Indo-U.S. Regulatory Workshop April 1, 2010. Commissioner Philip D. Moeller will convene a workshop at the Federal Energy Regulatory...

  18. 77 FR 65873 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-10-31

    ... Electric Reliability Corporation; Notice of Filing Take notice that on October 12, 2012, the North American Electric Reliability Corporation (NERC) submitted a compliance filing in accordance with the Federal Energy Regulatory Commission's Order (FERC or Commission) in North American Electric Reliability Corporation, 140...

  19. 77 FR 32629 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2012-06-01

    ... Electric Reliability Corporation; Notice of Filing Take notice that on May 14, 2012, the North American Electric Reliability Corporation (NERC) submitted a compliance filing in accordance with the Federal Energy Regulatory Commission's Order (FERC or Commission) in North American Electric Reliability Corporation, 138...

  20. 78 FR 18333 - North American Electric Reliability Corporation; Notice of Filing

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-03-26

    ... Electric Reliability Corporation; Notice of Filing Take notice that on March 15, 2013, the North American Electric Reliability Corporation (NERC) submitted a compliance filing and report in accordance with the Federal Energy Regulatory Commission's Order (FERC or Commission) in North American Electric Reliability...

Top