75 FR 6339 - California Public Utilities Commission Petition for Rulemaking
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-09
... (NORS). The CPUC also requests password-protected access to California- specific disruption and outage... ``limited to California-specific disruption and outage data.'' NORS is the Web-based filing system through which certain communications providers submit reports to the Commission of disruptions to communications...
California Energy Systems for the 21st Century 2016 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Van Randwyk, J.; Boutelle, A.; McClelland, C.
The California Energy Systems for the 21st Century (CES-21) Program is a public-private collaborative research and development program between the California Joint Utilities1 and Lawrence Livermore National Laboratory (LLNL). The purpose of this annual report is to provide the California Public Utilities Commission (CPUC or Commission) with a summary of the 2016 progress of the CES-21 Program.
Operational Benefits of Meeting California's Energy Storage Targets
DOE Office of Scientific and Technical Information (OSTI.GOV)
Eichman, Josh; Denholm, Paul; Jorgenson, Jennie
In October 2013, the California Public Utilities Commission (CPUC) finalized procurement targets and other requirements to its jurisdictional utilities for a minimum of 1,325 MW of 'viable and cost-effective' energy storage systems by 2020. The goal of this study is to explore several aspects of grid operations in California and the Western Interconnection resulting from meeting the CPUC storage targets. We perform this analysis using a set of databases and grid simulation tools developed and implemented by the CPUC, the California Independent System Operator (CAISO), and the California Energy Commission (CEC) for the CPUC's Long-term Procurement Plan (LTPP). The 2014more » version of this database contains information about generators, storage, transmission, and electrical demand, for California in the year 2024 for both 33% and 40% renewable energy portfolios. We examine the value of various services provided by energy storage in these scenarios. Sensitivities were performed relating to the services energy storage can provide, the capacity and duration of storage devices, export limitations, and negative price floor variations. Results show that a storage portfolio, as outlined by the CPUC, can reduce curtailment and system-wide production costs for 33% and 40% renewable scenarios. A storage device that can participate in energy and ancillary service markets provides the grid with the greatest benefit; the mandated storage requirement of 1,325 MW was estimated to reduce the total cost of production by about 78 million per year in the 33% scenario and 144 million per year in the 40% scenario. Much of this value is derived from the avoided start and stop costs of thermal generators and provision of ancillary services. A device on the 2024 California grid and participating in only ancillary service markets can provide the system with over 90% of the value as the energy and ancillary service device. The analysis points to the challenge of new storage providing regulation reserve, as the added storage could provide about 75% of the regulation up requirement for all of California, which would likely greatly reduce regulation prices and potential revenue. The addition of storage in California decreases renewable curtailment, particularly in the 40% RPS case. Following previous analysis, storage has a mixed impact on emissions, generally reducing emissions, but also creating additional incentives for increased emissions from out-of-state coal generations. Overall, storage shows significant system cost savings, but analysis also points to additional challenges associated with full valuation of energy storage, including capturing the operational benefits calculated here, but also recovering additional benefits associated avoided generation, transmission, and distribution capacity, and avoided losses.« less
NASA Astrophysics Data System (ADS)
Hornbuckle, James Dixon
Deregulation of the electric utility industry in California is moving in a direction that places greater reliance on the market forces of competition. Investor owned utilities (IOU's) are using mergers and acquisitions to improve their ability to compete in this new environment. Two large mergers were proposed in 1996 that could affect the California market. The first is between Enron Corporation, a large power marketer and Portland General Corporation, owner of Portland General Electric. The second is between Pacific Enterprises Inc., owner of Southern California Gas Company, the largest natural gas utility in the U. S., and Enova Corporation, owner of San Diego Gas and Electric Company. Understanding the impact of these mergers on the California electric power market is the focus of this study. This study examines hypotheses dealing with: (1) Merger Strategy, (2) Efficiency, and (3) Market Power. Using the Miles and Snow (1978) typology, I develop a strategic orientation model for the merger participants and their competitors. The results suggest a two-stage strategic orientation: (1) regulated core business stage, where the firms follow a Defender strategy, and (2) unregulated business stage, where the firms follow a Prospector strategy. Further, the results show the mergers are consistent with the strategy of Enron and Pacific Enterprises. Event study methodology, dollar gains/losses and market value weighted returns are used to determine if the mergers support the efficiency hypothesis. The evidence suggests the mergers lead to increased competitive advantage through improved efficiency for the participants. The results also suggest the mergers do not harm the rivals. The results of structural changes made by the California Public Utilities Commission (CPUC) in deregulation of the California market and analysis of the mergers by the CPUC and the Public Utility Commission of Oregon suggest that the exercise of market power is not a significant issue. Finally, the likely winners in the deregulated environment in California are the broad-based IOU firms, which use a combination Defender/Prospector strategy and do not over-commit resources to mergers or acquisitions.
DOE Office of Scientific and Technical Information (OSTI.GOV)
LaCommare, Kristina; Larsen, Peter; Eto, Joseph
Policymakers and regulatory agencies are expressing renewed interest in the reliability and resilience of the U.S. electric power system in large part due to growing recognition of the challenges posed by climate change, extreme weather events, and other emerging threats. Unfortunately, there has been little or no consolidated information in the public domain describing how public utility/service commission (PUC) staff evaluate the economics of proposed investments in the resilience of the power system. Having more consolidated information would give policymakers a better understanding of how different state regulatory entities across the U.S. make economic decisions pertaining to reliability/resiliency. To helpmore » address this, Lawrence Berkeley National Laboratory (LBNL) was tasked by the U.S. Department of Energy Office of Energy Policy and Systems Analysis (EPSA) to conduct an initial set of interviews with PUC staff to learn more about how proposed utility investments in reliability/resilience are being evaluated from an economics perspective. LBNL conducted structured interviews in late May-early June 2016 with staff from the following PUCs: Washington D.C. (DCPSC), Florida (FPSC), and California (CPUC).« less
High-Penetration PV Integration Handbook for Distribution Engineers
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seguin, Rich; Woyak, Jeremy; Costyk, David
2016-01-01
This handbook has been developed as part of a five-year research project which began in 2010. The National Renewable Energy Laboratory (NREL), Southern California Edison (SCE), Quanta Technology, Satcon Technology Corporation, Electrical Distribution Design (EDD), and Clean Power Research (CPR) teamed together to analyze the impacts of high-penetration levels of photovoltaic (PV) systems interconnected onto the SCE distribution system. This project was designed specifically to leverage the experience that SCE and the project team would gain during the significant installation of 500 MW of commercial scale PV systems (1-5 MW typically) starting in 2010 and completing in 2015 within SCE’smore » service territory through a program approved by the California Public Utility Commission (CPUC).« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schauder, C.
This subcontract report was completed under the auspices of the NREL/SCE High-Penetration Photovoltaic (PV) Integration Project, which is co-funded by the U.S. Department of Energy (DOE) Office of Energy Efficiency and Renewable Energy (EERE) and the California Solar Initiative (CSI) Research, Development, Demonstration, and Deployment (RD&D) program funded by the California Public Utility Commission (CPUC) and managed by Itron. This project is focused on modeling, quantifying, and mitigating the impacts of large utility-scale PV systems (generally 1-5 MW in size) that are interconnected to the distribution system. This report discusses the concerns utilities have when interconnecting large PV systems thatmore » interconnect using PV inverters (a specific application of frequency converters). Additionally, a number of capabilities of PV inverters are described that could be implemented to mitigate the distribution system-level impacts of high-penetration PV integration. Finally, the main issues that need to be addressed to ease the interconnection of large PV systems to the distribution system are presented.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Broderick, Robert Joseph; Quiroz, Jimmy Edward; Reno, Matthew J.
2015-11-01
The third solicitation of the California Solar Initiative (CSI) Research, Development, Demonstration and Deployment (RD&D) Program established by the California Public Utility Commission (CPUC) is supporting the Electric Power Research Institute (EPRI), National Renewable Energy Laboratory (NREL), and Sandia National Laboratories (SNL) with collaboration from Pacific Gas and Electric (PG&E), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E), in research to improve the Utility Application Review and Approval process for interconnecting distributed energy resources to the distribution system. Currently this process is the most time - consuming of any step on the path to generating power onmore » the distribution system. This CSI RD&D solicitation three project has completed the tasks of collecting data from the three utilities, clustering feeder characteristic data to attain representative feeders, detailed modeling of 16 representative feeders, analysis of PV impacts to those feeders, refinement of current screening processes, and validation of those suggested refinements. In this report each task is summarized to produce a final summary of all components of the overall project.« less
Power Hardware-in-the-Loop-Based Anti-Islanding Evaluation and Demonstration
DOE Office of Scientific and Technical Information (OSTI.GOV)
Schoder, Karl; Langston, James; Hauer, John
2015-10-01
The National Renewable Energy Laboratory (NREL) teamed with Southern California Edison (SCE), Clean Power Research (CPR), Quanta Technology (QT), and Electrical Distribution Design (EDD) to conduct a U.S. Department of Energy (DOE) and California Public Utility Commission (CPUC) California Solar Initiative (CSI)-funded research project investigating the impacts of integrating high-penetration levels of photovoltaics (PV) onto the California distribution grid. One topic researched in the context of high-penetration PV integration onto the distribution system is the ability of PV inverters to (1) detect islanding conditions (i.e., when the distribution system to which the PV inverter is connected becomes disconnected from themore » utility power connection) and (2) disconnect from the islanded system within the time specified in the performance specifications outlined in IEEE Standard 1547. This condition may cause damage to other connected equipment due to insufficient power quality (e.g., over-and under-voltages) and may also be a safety hazard to personnel that may be working on feeder sections to restore service. NREL teamed with the Florida State University (FSU) Center for Advanced Power Systems (CAPS) to investigate a new way of testing PV inverters for IEEE Standard 1547 unintentional islanding performance specifications using power hardware-in-loop (PHIL) laboratory testing techniques.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alstone, Peter; Potter, Jennifer; Piette, Mary Ann
Demand response (DR) is an important resource for keeping the electricity grid stable and efficient; deferring upgrades to generation, transmission, and distribution systems; and providing other customer economic benefits. This study estimates the potential size and cost of the available DR resource for California’s three investor-owned utilities (IOUs), as the California Public Utilities Commission (CPUC) evaluates how to enhance the role of DR in meeting California’s resource planning needs and operational requirements. As the state forges a clean energy future, the contributions of wind and solar electricity from centralized and distributed generation will fundamentally change the power grid’s operational dynamics.more » This transition requires careful planning to ensure sufficient capacity is available with the right characteristics – flexibility and fast response – to meet reliability needs. Illustrated is a snapshot of how net load (the difference between demand and intermittent renewables) is expected to shift. Increasing contributions from renewable generation introduces steeper ramps and a shift, into the evening, of the hours that drive capacity needs. These hours of peak capacity need are indicated by the black dots on the plots. Ultimately this study quantifies the ability and the cost of using DR resources to help meet the capacity need at these forecasted critical hours in the state.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Alstone, Peter; Potter, Jennifer; Piette, Mary Ann
California’s legislative and regulatory goals for renewable energy are changing the power grid’s dynamics. Increased variable generation resource penetration connected to the bulk power system, as well as, distributed energy resources (DERs) connected to the distribution system affect the grid’s reliable operation over many different time scales (e.g., days to hours to minutes to seconds). As the state continues this transition, it will require careful planning to ensure resources with the right characteristics are available to meet changing grid management needs. Demand response (DR) has the potential to provide important resources for keeping the electricity grid stable and efficient, tomore » defer upgrades to generation, transmission and distribution systems, and to deliver customer economic benefits. This study estimates the potential size and cost of future DR resources for California’s three investor-owned utilities (IOUs): Pacific Gas and Electric Company (PG&E), Southern California Edison Company (SCE), and San Diego Gas & Electric Company (SDG&E). Our goal is to provide data-driven insights as the California Public Utilities Commission (CPUC) evaluates how to enhance DR’s role in meeting California’s resource planning needs and operational requirements. We address two fundamental questions: 1. What cost-competitive DR service types will meet California’s future grid needs as it moves towards clean energy and advanced infrastructure? 2. What is the size and cost of the expected resource base for the DR service types?« less
NREL/SCE High Penetration PV Integration Project: FY13 Annual Report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Mather, B. A.; Shah, S.; Norris, B. L.
2014-06-01
In 2010, the National Renewable Energy Laboratory (NREL), Southern California Edison (SCE), Quanta Technology, Satcon Technology Corporation, Electrical Distribution Design (EDD), and Clean Power Research (CPR) teamed to analyze the impacts of high penetration levels of photovoltaic (PV) systems interconnected onto the SCE distribution system. This project was designed specifically to benefit from the experience that SCE and the project team would gain during the installation of 500 megawatts (MW) of utility-scale PV systems (with 1-5 MW typical ratings) starting in 2010 and completing in 2015 within SCE's service territory through a program approved by the California Public Utility Commissionmore » (CPUC). This report provides the findings of the research completed under the project to date.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rajkovich, Nicholas B.; Diamond, Rick; Burke, Bill
The U.S. Department of Energy (DOE), the California Public Utilities Commission (CPUC), and a number of professional organizations have established a target of zero net energy (ZNE) in buildings by 2030. One definition of ZNE is a building with greatly reduced needs for energy through efficiency gains with the balance of energy needs supplied by renewable technologies. The push to ZNE is a response to research indicating that atmospheric concentrations of greenhouse gases have increased sharply since the eighteenth century, resulting in a gradual warming of the Earth?s climate. A review of ZNE policies reveals that the organizations involved framemore » the ZNE issue in diverse ways, resulting in a wide variety of myths and a divergent set of epistemologies. With federal and state money poised to promote ZNE, it is timely to investigate how epistemologies, meaning a belief system by which we take facts and convert them into knowledge upon which to take action, and the propagation of myths might affect the outcome of a ZNE program. This paper outlines myths commonly discussed in the energy efficiency and renewable energy communities related to ZNE and describes how each myth is a different way of expressing"the truth." The paper continues by reviewing a number of epistemologies common to energy planning, and concludes that the organizations involved in ZNE should work together to create a"collaborative rationality" for ZNE. Through this collaborative framework it is argued that we may be able to achieve the ZNE and greenhouse gas mitigation targets.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Smith, Jeff; Rylander, Matthew; Boemer, Jens
The fourth solicitation of the California Solar Initiative (CSI) Research, Development, Demonstration and Deployment (RD&D) Program established by the California Public Utilities Commission (CPUC) supported the Electric Power Research Institute (EPRI), National Renewable Energy Laboratory (NREL), and Sandia National Laboratories (SNL) with data provided from Pacific Gas and Electric (PG&E), Southern California Edison (SCE), and San Diego Gas and Electric (SDG&E) conducted research to determine optimal default settings for distributed energy resource advanced inverter controls. The inverter functions studied are aligned with those developed by the California Smart Inverter Working Group (SIWG) and those being considered by the IEEE 1547more » Working Group. The advanced inverter controls examined to improve the distribution system response included power factor, volt-var, and volt-watt. The advanced inverter controls examined to improve the transmission system response included frequency and voltage ride-through as well as Dynamic Voltage Support. This CSI RD&D project accomplished the task of developing methods to derive distribution focused advanced inverter control settings, selecting a diverse set of feeders to evaluate the methods through detailed analysis, and evaluating the effectiveness of each method developed. Inverter settings focused on the transmission system performance were also evaluated and verified. Based on the findings of this work, the suggested advanced inverter settings and methods to determine settings can be used to improve the accommodation of distributed energy resources (PV specifically). The voltage impact from PV can be mitigated using power factor, volt-var, or volt-watt control, while the bulk system impact can be improved with frequency/voltage ride-through.« less
Using Supercomputers to Speed Execution of the CAISO/PLEXOS 33% RPS Study
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meyers, C; Streitz, F; Yao, Y
2011-09-19
The study's official title is 'ISO Study of Operational Requirements and Market Impacts at 33% Renewable Portfolio Standard (RPS).' The stated objectives are twofold: (1) identifying operational requirements and resource options to reliably operate the ISO-controlled grid under a 33% RPS in 2020; and (2) inform market, planning, and policy/regulatory decisions by the ISO, state agencies, market participants, and other stakeholders. The first of these objectives requires the hourly estimates of integration requirements, measured in terms of operational ramp, load following and regulation capacity and ramp rates, as well as additional capacity to resolve operational violations. It also involves considerationmore » of other variables that affect the results, such as the impact of different mixes of renewable technologies, and the impact of forecasting error and variability. The second objective entails supporting the CPUC to identify long-term procurement planning needs, costs, and options, as well as informing other decisions made by the CPUC and state agencies. For the ISO itself this includes informing state-wide transmission planning needs for renewables up to a 33% RPS, and informing design of wholesale markets for energy and ancillary services to facilitate provision of integration capacities. The study is designed in two phases. The first (current) phase is focused on operational requirements and addressing these requirements with existing and new conventional fossil generation; for instance, gas turbines and/or combined cycle units. The second (planned) phase will address the same operational requirements with a combination of conventional fossil generation resources, new non-generation resources, and a renewable resource dispatch. There are seven different scenarios considered in the current phase: a 20% RPS reference case; four 33% RPS cases (a reference case, a high out-of-state case, a high distributed generation case, and a low load case); an alternative 27.5% RPS case; and an all-gas case (no new renewables after 2008). In addition, the CPUC is planning a new set of cases that will alter the anticipated sets of runs.« less
DOE Office of Scientific and Technical Information (OSTI.GOV)
Priimak, Dmitri
2014-12-01
We present a finite difference numerical algorithm for solving two dimensional spatially homogeneous Boltzmann transport equation which describes electron transport in a semiconductor superlattice subject to crossed time dependent electric and constant magnetic fields. The algorithm is implemented both in C language targeted to CPU and in CUDA C language targeted to commodity NVidia GPU. We compare performances and merits of one implementation versus another and discuss various software optimisation techniques.
75 FR 37789 - Orlando Utilities Commission; Notice of Filing
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-30
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ10-2-000] Orlando Utilities Commission; Notice of Filing June 23, 2010. Take notice that on June 11, 2010, the Orlando Utilities Commission filed, pro forma revised tariff sheets for inclusion in its open access transmission...
76 FR 35209 - Orlando Utilities Commission; Notice of Filing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-16
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-12-001] Orlando Utilities Commission; Notice of Filing Take notice that on May 26, 2011, Orlando Utilities Commission submitted its tariff filing per 35.17(b): Amendment to Compliance Filing to be effective 4/15/2011. Any...
78 FR 78352 - Orlando Utilities Commission; Notice of Filing
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-26
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ14-4-000] Orlando Utilities Commission; Notice of Filing Take notice that on December 18, 2013, Orlando Utilities Commission submitted its tariff filing per 35.28(e): Order No. 1000 Further Regional Compliance Filing to be effective...
76 FR 49469 - Orlando Utilities Commission; Notice of Filing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-10
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-15-000] Orlando Utilities Commission; Notice of Filing Take notice that on July 29, 2011, Orlando Utilities Commission (OUC), pursuant to section 205 of the Federal Power Act (FPA) \\1\\ and Part 35 of the Federal Energy Regulatory...
76 FR 25685 - Orlando Utilities Commission; Notice of Filing
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-05
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. NJ11-12-000] Orlando Utilities Commission; Notice of Filing Take notice that on April 15, 2011, Orlando Utilities Commission submitted its tariff filing per 35.25(e): Order 890 compliance to be effective 4/15/2011. Any person...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-07
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. TS11-2-000] City Utility Commission of the City of Owensboro, Kentucky; Notice of Request for Waiver or Exemption Take notice that on March 18, 2011, The City Utility Commission of the City of Owensboro, Kentucky, filed a petition for...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-12-17
...)] Utility Scale Wind Towers From China and Vietnam; Commission Determination To Deny a Request To Hold a Portion of a Hearing in Camera AGENCY: U.S. International Trade Commission. ACTION: Commission..., Office of the General Counsel, U.S. International Trade Commission, telephone 202- 205-3041. Hearing...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-06
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL11-64-000; Docket No. ER11-3657-000] Mississippi Delta Energy Agency, Clarksdale Public Utilities Commission, Public Service Commission of Yazoo City, Arkansas Electric Cooperative Corporation, South Mississippi Electric Power...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Feurer, D A; Weaver, C L; Gallagher, K C
1980-01-01
The Rhode Island statutes vest in the Public Utility Commission and the Division of Public Utilities the exclusive power and authority to regulate public utility companies in that state. Both bodies have been established within the Department of Business Regulation but are independent of the Department's director and are not under his jurisdiction. The jurisdiction to regulate utilities is shared by the Commission and the Division. The Commission serves as a quasi-judicial tribunal with jurisdiction, powers, and duties to hold investigations and hearings involving rates, sufficiency and resonableness of facilities, gas, electric, water, and pipeline public utilities. The administrator, whomore » is chief executive officer of the Division, is responsible for exercising the jurisdiction, supervision, powers, and duties not specifically assigned to the Commission. By virtue of his office, the chairman of the Commission serves also as the administrator and he supervises and directs the execution of all laws relating to public utilities and carriers and all regulations and orders of the Commission governing the conduct and charges of public utilities. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.« less
10 CFR 50.102 - Commission order for operation after revocation.
Code of Federal Regulations, 2011 CFR
2011-01-01
... Section 50.102 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... program of the Department requires continued operation of a production or utilization facility, the... be operated for a period of time as, in the judgment of the Commission, the public convenience and...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-30
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at the National Association of Regulatory Utility Commissioners 2012 Summer Committee Meetings The... Commission and/or Commission staff may attend the following meetings: Gas and Electricity Interdependencies...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-30
...The Federal Energy Regulatory Commission (Commission) is revising its regulations to foster competition and transparency in ancillary services markets. The Commission is revising certain aspects of its current market-based rate regulations, ancillary services requirements under the pro forma open-access transmission tariff (OATT), and accounting and reporting requirements. Specifically, the Commission is revising its regulations to reflect reforms to its Avista policy governing the sale of ancillary services at market-based rates to public utility transmission providers. The Commission is also requiring each public utility transmission provider to add to its OATT Schedule 3 a statement that it will take into account the speed and accuracy of regulation resources in its determination of reserve requirements for Regulation and Frequency Response service, including as it reviews whether a self-supplying customer has made ``alternative comparable arrangements'' as required by the Schedule. The final rule also requires each public utility transmission provider to post certain Area Control Error data as described in the final rule. Finally, the Commission is revising the accounting and reporting requirements under its Uniform System of Accounts for public utilities and licensees and its forms, statements, and reports, contained in FERC Form No. 1, Annual Report of Major Electric Utilities, Licensees and Others, FERC Form No. 1-F, Annual Report for Nonmajor Public Utilities and Licensees, and FERC Form No. 3-Q, Quarterly Financial Report of Electric Utilities, Licensees, and Natural Gas Companies, to better account for and report transactions associated with the use of energy storage devices in public utility operations.
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-28
... Oreille County Public Utility District; Notice of Designation of Commission Staff as Non-Decisional January 21, 2010. Commission staff member James Hastreiter (Office of Energy Projects, 503-552-2760; [email protected] ) is hereby designated as ``non-decisional'' staff and assigned to participate in...
Public Utility Commission manual for Section 210 of PURPA for Vermont
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Public Utility Regulatory Policies Act of 1978 (PURPA) places obligations on both electric utilities and state regulatory commissions. PURPA requires every electric utility to purchase all energy and capacity made available to it, by a qualifying facility, and to sell energy and capacity to a qualifying facility upon the qualifying facility's request. State regulatory commissions must implement and administer these utility obligations and other requirements that were implemented by the Federal Energy Regulatory Commission's (FERC) final rules, which became effective March 20, 1981, and must set fair rates for electric power purchases and sales between utilities and small powermore » producers. This manual provides a concise, annotated explanation of the final FERC rules, a description of federal and state statutory authorizations, court challenges to these authorizations, analysis of the relationship between federal and state laws, analysis of Vermont's implementation of section 210 of PURPA and for comparison, annotations of selected state regulatory authority decisions.« less
Public Utility Commission manual for Section 210 of PURPA for Montana
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Public Utility Regulatory Policies Act of 1978 (PURPA) places obligations on both electric utilities and state regulatory commissions. PURPA requires every electric utility to purchase all energy and capacity made available to it, by a qualifying facility, and to sell energy and capacity to a qualifying facility upon the qualifying facility's request. State regulatory commissions must implement and administer these utility obligations and other requirements that were implemented by the Federal Energy Regulatory Commission's (FERC) final rules, which became effective March 20, 1981; and must set fair rates for electric power purchases and sales between utilities and small powermore » producers. This manual provides a concise, annotated explanation of the final FERC rules, a description of federal and state statutory authorizations, court challenges to these authorizations analysis of the relationship between federal and state laws, analysis of Montana's implementation of section 210 of PURPA and for comparison, annotations of selected state regulatory authority decisions.« less
Public Utility Commission manual for Section 210 of PURPA for Arkansas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The Public Utility Regulatory Policies Act of 1978 (PURPA) places obligations on both electric utilities and state regulatory commissions. PURPA requires every electric utility to purchase all energy and capacity made available to it, by a qualifying facility, and to sell energy and capacity to a qualifying facility upon the qualifying facility's request. State regulatory commissions must implement and administer these utility obligations and other requirements that were implemented by the Federal Energy Regulatory Commission's (FERC) final rules, which became effective March 20, 1981; and must set fair rates for electric power purchases and sales between utilities and small powermore » producers. This manual provides a concise, annotated explanation of the final FERC rules, a description of federal and state statutory authorizations, court challenges to these authorizations, analysis of the relationship between federal and state laws, analysis of Arkansas' implementation of section 210 of PURPA and for comparison, annotations of selected state regulatory authority decisions.« less
(PURPA grants to state utility regulatory commissions and electric utilities). Final report
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lambert, E.S.
The Utah Commission considered fully in hearings each of the eleven regulatory and ratemaking standards. In addition, the Commission held hearings concerning the lifeline rates provision of PURPA and the cogeneration and small power production provision. The Utah Commission has taken action with respect to each of these standards. In its Order concerning cases numbered 80-999-09 and 81-999-01, 02, 03, 04, and 05, issued May 14, 1982, and appended to this report, the Utah Commission adopted each of the ratemaking standards. Its actions concerning adoption of the regulatory standards have been the subject of hearings and orders issued during themore » period of time prior to the issuance of the May 14, 1982 Order. After full hearing on the subject, the Utah Commission declined to adopt lifeline rates. In an Order issued April 9, 1981, the Commission implemented the FERC regulations issued pursuant to PURPA Sections 201 and 210. Contained in that Order were interim rates based upon the avoided costs of the electric utilities under this Commission's jurisdiction that are subject to PURPA.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-16
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at National Association of Regulatory Utility Commissioners 123rd Annual Meeting The Federal.../or Commission staff may attend the following meeting: FERC/National Association of Regulatory Utility...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-27
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-27-000] Louisville Gas and Electric Company; Kentucky Utilities Company; Notice of Petition for Declaratory Order Take notice that on February 14, 2012, pursuant to Rule 207 of the Federal Energy Regulatory Commission's (Commission) Rules of Practice and Procedure, 18 CFR...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Staats, E.B.
1978-01-04
A report entitled: The Force of the Public Utility Holding Company Act Has Been Greatly Reduced By Changes in the Securities and Exchange Commission's Enforcement Policies, was issued June 20, 1977 by the GAO. The report raised questions concerning the narrowness of the Commission's administration of a statute which the Congress had intended to be wide-ranging and pervasive. On June 30, 1977, the Securities and Exchange Commission issued comments rejecting all of the reports recommendations. This report summarizes the findings of GAO's earlier report. GAO's evaluation of the Commission comments is presented in Appendix I and the Commission's comments aremore » presented in Appendix II.« less
Twenty-First Century Energy Policy Making in New Hampshire: Lessons for Collaboration
NASA Astrophysics Data System (ADS)
Herndon, Henry Phillip
In this thesis I investigate the organizational field that is New Hampshire's energy policy-making community as it engages with the state regulatory institution, the Public Utilities Commission, to grapple the challenges of designing a 21st century electricity marketplace. The Public Utilities Commission structure and function are evolving. Historically, the Commission has used adjudicative proceedings to carry out a ratemaking function for monopoly utilities. The Commission's adjudicative process is evolving to become increasingly collaborative as it begins to carry out its new function of 21st century electricity market design. I analyze both the new structure (collaboration) and the new function (21 st century electricity market design) of the Commission through three in-depth case studies of dockets (policy-making processes): Energy Efficiency Resource Standard, Electric Grid Modernization, and Net Metering. My findings identify ways in which the Public Utilities Commission structure for making energy policy decisions is flexible and may be shaped by stakeholders engaging in policy processes. Stakeholders have the power to collectively design regulatory proceedings to incorporate greater opportunities for collaboration to better suit the challenges posed by a 21st century electricity sector. I provide recommendations on how that redesign should occur.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Feurer, D A; Weaver, C L; Gallagher, K C
1980-01-01
Until April 1, 1979, the Public Service Commission had been vested with exclusive jurisdiction over the regulation of rates and service of utilities. As of that date two new agencies, the Energy Regulatory Commission (ERC) and the Utility Regulatory Commission (URC), have replaced the Public Service Commission. The ERC consists of three full-time members appointed by the governor for four year terms and is responsible for enforcing the provisions of the Kentucky statutes relating to electric and gas utilities. The three-member URC is responsible for enforcing the provisions relating to non-energy utilities such as telephone, sewer, and water utilities. Themore » statutes vest all regulatory authority over public utilities in either the ERC or the URC. Local governments retain only the power to grant local franchises. However, it should be noted, that any utility owned or operated by a political subdivision of the state is exempt from regulation. Thus, local government has complete authority over utilities which are self-owned. Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES.« less
Audit of the Federal Energy Regulatory Commission`s Office of Chief Accountant
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-04-07
The Federal Energy Regulatory Commission`s (Commission) mission is to oversee America`s natural gas and oil pipeline transportation, electric utility, and hydroelectric power industries to ensure that consumers receive adequate energy supplies at just and reasonable rates. To carry out this mission, the Commission issues regulations covering the accounting, reporting, and rate-making requirements of the regulated utility companies. The Commission`s Office of Chief Accountant performs financial related audits at companies to ensure compliance with these regulations. The purpose of this audit was to evaluate the office of Chief Accountant`s audit performance. Specifically, the objectives were to determine if the most appropriatemore » audit approach was used and if a quality assurance process was in place to ensure reports were accurate and supported by the working papers.« less
75 FR 44781 - Commission Information Collection Activities (FERC-582); Comment Request; Extension
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-29
... ``Report/Form/ Annual Charges Report.'' Public utilities and power marketers subject to these annual... Commission issues bills for annual charges, and public utilities and power marketers then must pay the...
ERIC Educational Resources Information Center
Koeppe, Al
This document provides a written account of a testimony of Al Koeppe, on behalf of the New Jersey Commission on Higher Education, to the New Jersey Board of Public Utilities. He describes the Commission on Higher Education and its role in the state as coordinating higher education within the state, planning, policy development, and advocacy. He…
Ban on advertising promoting energy usage violates First Amendment
DOE Office of Scientific and Technical Information (OSTI.GOV)
Cohen, J.C.
In reversing the New York Court of Appeals in the Central Hudson Gas suit, the Supreme Court expanded the protection afforded commercial speech. The result could have a major impact on means used to achieve policy objectives of national and state energy conservation. Public utility commissions attempting to limit the growth of energy usage may have to devise stringent economic regulations that directly affect the marketplace and consumer alternatives. This might require an expansion of the statutory powers of public utility commissions. The Court's decision will require public utility commissions to either adopt regulations that restrict the content and formatmore » of utility speech or allocate costs to utility shareholders of impermissible advertising. Otherwise, a utility's unbridled ability to speak, given the economic power of such enterprises and their economic interest, could totally undermine the credibility of national and state energy-conservation policy. 12 references.« less
77 FR 3470 - Combined Notice of Filings
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-24
... that the Commission has received the following Natural Gas Pipeline Rate and Refund Report filings... LLC, Missouri Joint Municipal Electric Util., City of Independence, Missouri, Kansas Power Pool... Municipal Electric Utility Commission, the City of Independence, Missouri, Kansas Power Pool and Kansas City...
Taming B.C. Hydro: Site C and the implementation of the B.C. Utilities Commission Act
NASA Astrophysics Data System (ADS)
Smith, L. Graham
1988-07-01
Public policy making in resources management is greatly influenced by the institutional arrangements that arise out of the legal powers, administrative structures, and financial provisions of the decision system. In British Columbia, the institutional arrangements for energy planning in the province have been greatly altered by the passage of the Utilities Commission Act in 1980. This act redefines the policy implementation process for energy in British Columbia and provides for the regulation of the province's power utility, B.C. Hydro. This is the first time that the hitherto autonomous utility has been subject to regulation and the Utilities Commission Act represents a major reform in the institutional arrangements for energy planning in the province. The article evaluates the effectiveness of the 1980 B.C. Utilities Commission Act and assesses the impact of the legislation upon the institutional arrangements for energy planning in the province. Data for the article were derived from written sources and a series of personal interviews with key participants involved with energy planning in B.C. It is shown that the act represented a major departure in the management of energy resources in B.C. Moreover the implementation of the act's provisions, particularly in regard to B.C. Hydro, had a dramatic impact on the development of new energy projects in the province. It is suggested that while the political and economic climate during the period also favored restraint, the major influence on “taming” the utility was passage of the Utilities Commission Act. The article concludes by exploring the implications of policy changes that have occurred as a consequence of the act's impact on B.C. Hydro.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Sevel, F.
1996-12-31
Numerous authors have discussed the massive changes in the new regulatory environment and the necessary impact of these changes on the roles, responsibilities, structure, function, and mission of the public utility commission. In fact, when public utility commissioners gathered in Denver for the NRRI/NARUC Commissioners Summit in April 1995, {open_quotes}they made it clear that they embraced change as necessary to effective commission functioning in new regulatory environments and made it clear that they were prepared to direct that change.{close_quotes} The Commissioners identified the following trends of change: (1) Dichotomy of customers in core and noncore groupings. (2) Unbundling and newmore » service offerings. (3) Deregulation of certain services and markets. (4) Increased use of market-based pricing and incentive ratemaking. (5) Large users seeking lowest-cost service providers. (6) Shift from old regulatory compact [of] territorial exclusivity and assured recovery. (7) Changing obligation to serve. (8) Utility diversification into other businesses and use of holding company structures. (9) Increased business risk for utilities. (10) Uncertainty as to continued attention to social goals. In response to these changes, they identified five clusters of core missions for public utility commissions: (1) Protection of those customers who would not reap the full benefits of competition. (2) Support of competition balanced with an interest in fair and effective competition. (3) The provision of timely and clear decisions to utility managers and allowing utilities the flexibility to adapt to new conditions. (4) Preserving the commitment to social goals compatible with the competitive market. (5) Addressing the impact of new corporate structures, jurisdictional changes, necessary change in regulatory methods, and customer protection in the new environment.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-27
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at National Association of Regulatory Utility Commissioners Summer Committee Meetings July 20.../or Commission staff may attend the following meeting: Committee on Electricity: Sacramento Convention...
Colorado Public Utility Commission's Xcel Wind Decision
DOE Office of Scientific and Technical Information (OSTI.GOV)
Lehr, R. L.; Nielsen, J.; Andrews, S.
2001-09-20
In early 2001 the Colorado Public Utility Commission ordered Xcel Energy to undertake good faith negotiations for a wind plant as part of the utility's integrated resource plan. This paper summarizes the key points of the PUC decision, which addressed the wind plant's projected impact on generation cost and ancillary services. The PUC concluded that the wind plant would cost less than new gas-fired generation under reasonable gas cost projections.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-26
... Planning and Cost Allocation by Transmission Owning and Operating Public Utilities; Notice of Staff Informational Conferences Take notice that Commission staff will convene three informational conferences to discuss the requirements of Order No. 1000.\\1\\ The Commission directed its staff to hold the informational...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-12
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2157-188] Public Utility District No.1 of Snohomish County, WA; Notice of Technical Conference for the Jackson Hydroelectric Project.... Commission staff will hold a technical conference to discuss the proposed license articles submitted by the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-18
..., 2011, pursuant to section 210(h)(2) of the Public Utility Regulatory Policies Act of 1978 (PURPA),\\1... (Commission) enforce the requirements of PURPA against Pacific Gas and Electric Company (PG&E), Southern... interstate wholesale sales of electricity and the Commission's Regulations implementing PURPA, in addition to...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-11
...- 0096] Florida Power Corporation, City of Alachua, City of Bushnell, City of Gainesville, City of Kissimmee, City of Leesburg, City of New Smyrna Beach and Utilities Commission, City of New Smyrna Beach, City of Ocala, Orlando Utilities Commission and City of Orlando, Seminole Electric Cooperative, Inc...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-16
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of FERC Staff Attendance at the SPP-ITO Louisville Gas & Electric/Kentucky Utilities Stakeholder Meeting The Federal Energy Regulatory Commission hereby gives notice that members of its staff may attend the meeting noted below. Their attendance...
77 FR 14011 - Rainbow Ranch Wind, LLC, Rainbow West Wind, LLC; Notice of Petition for Enforcement
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-08
... Commission (Commission) initiate an enforcement action against the Idaho Public Utilities Commission (Idaho... Nos. 32256 and 32300, as would allow Petitioners to pursue enforcement action in a U.S. Federal...). Protests will be considered by the Commission in determining the appropriate action to be taken, but will...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-06
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff... Commission and/or Commission staff may attend the following meetings: FERC/National Association of Regulatory... Service Commission of South Carolina and the South Carolina Office of Regulatory Staff Docket No. AD12-1...
Code of Federal Regulations, 2010 CFR
2010-04-01
... Commission. The Commission is a regional governmental agency whose purpose is to effect comprehensive multiple purpose planning for the conservation, utilization, development, management, and control of the... fulfill its statutory regional governmental role. (c) The objectives of the Commission are to: (1) Develop...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-07
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2114-209] Public Utility District No. 2 of Grant County, Washington; Notice of Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Protests Take notice that the following hydroelectric application has been filed with the Commission and is...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wirick, D.W.; Montgomery, G.E.; Wagman, D.C.
1995-09-01
One technology that can assist utilities remain financially viable in competitive markets and help utilities and regulators to better serve the public is information technology. Because geography is an important part of an electric, natural gas, telecommunications, or water utility, computer-based Geographic Information Systems (GIS) and related Automated Mapping/Facilities Management systems are emerging as core technologies for managing an ever-expanding variety of formerly manual or paper-based tasks. This report focuses on GIS as an example of the types of information systems that can be used by utilities and regulatory commissions. Chapter 2 provides general information about information systems and effectsmore » of information on organizations; Chapter 3 explores the conversion of an organization to an information-based one; Chapters 4 and 5 set out GIS as an example of the use of information technologies to transform the operations of utilities and commissions; Chapter 6 describes the use of GIS and other information systems for organizational reengineering efforts; and Chapter 7 examines the regulatory treatment of information systems.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-23
... FEDERAL COMMUNICATIONS COMMISSION Information Collection(s) Being Reviewed by the Federal... information collection(s). Comments are requested concerning: whether the proposed collection of information... information shall have practical utility; the accuracy of the Commission's burden estimate; ways to enhance...
18 CFR 131.20 - Application for approval of transfer of license.
Code of Federal Regulations, 2011 CFR
2011-04-01
... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, FEDERAL POWER ACT AND PUBLIC UTILITY... quadruplicate, together with one additional copy for each interested State commission) Before the Federal Energy... the Federal Energy Regulatory Commission of the transfer of the aforesaid license from the transferor...
Greg Lyman; Jessica Appel; Mia Ingolia; Ellen Natesan; Joe Ortiz
2017-01-01
To compensate for unavoidable impacts associated with critical water infrastructure capital improvement projects, the San Francisco Public Utilities Commission (SFPUC) restored over 2,050 acres of riparian, wetland, and upland habitat on watershed lands in Alameda, Santa Clara, and San Mateo Counties. Despite strict bio-sanitation protocols, plant pathogens (...
From franchise to state commission: Regulation of the electric utility industry, 1907 to 1932
NASA Astrophysics Data System (ADS)
Reutter, Keith Alan
1997-09-01
Empirical research into the effects of regulation on industry has been around since the early 1960s. Over the last thirty plus years a number of interesting results have been brought to the fore. For instance, it has been found that regulation of the trucking industry limits entry and increases prices. A similar result has been pointed to in other industries such as commercial airlines and banking. The effect of the state commission form of regulation on the electric utility industry has been less conclusive. State commissions became dominant during the period 1910-1930, replacing local franchising as a method of regulating the electric utility industry. Two competing theories suggest why this transformation took place, the "capture" and "public interest" theories of regulation. The capture theory of regulation suggests that the electric utility industry demanded state regulation as a way to earn above normal profits and reduce competition. The public interest theory suggests the purpose of regulation by state commissions was to benefit the general public by forcing the industry to be competitive. Few studies have tried to determine which theory more aptly describes the actual events that took place. The empirical model developed in Chapter V, is an extension of the current literature. A set of simultaneous equations describing the natural gas and electricity markets is estimated using cross-sectional time-series data from 1907 to 1932. The effect of regulation on the electric utility industry is modeled with a dummy variable taking on a value of one to designate that a state commission had been established. The results suggest the capture theory of regulation best describes the period under study. The empirical estimates indicate that state commissions (1) reduced the rate at which the real price of electricity was falling, (2) had a negative impact on firms entering the industry, (3) had a positive influence on the cost of producing a kwh of electricity, and (4) prevented industry profits from declining. This research adds to the existing literature on industry regulation in general, and specifically to the literature on the effects of regulation of the electric utility industry.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-08-22
... INTERNATIONAL TRADE COMMISSION [Investigation Nos. 701-TA-486 and 731-TA-1195-1196 (Final... Antidumping Investigations AGENCY: United States International Trade Commission. ACTION: Notice. SUMMARY: The...: Nathanael Comly (202-205-3174), Office of Investigations, U.S. International Trade Commission, 500 E Street...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-01
... Commission as explained below. The Commission issued a Notice in the Federal Register (75 FR 57744, 09/22... applicable records for the regulated public utilities, natural gas and oil pipeline companies subject to the... record retention requirements under FERC-555 were underestimated in the previous renewal of this...
17 CFR 200.30-7 - Delegation of authority to Secretary of the Commission.
Code of Federal Regulations, 2010 CFR
2010-04-01
....C. 78a et seq., the Public Utility Holding Company Act of 1935, 15 U.S.C. 79a et seq., the Trust.... 78y, section 24 of the Public Utility Holding Company Act of 1935, 15 U.S.C. 79x, section 322(a) of... officers of the Commission to serve notices of and orders for proceedings and decisions and orders in such...
78 FR 26771 - Otter Creek Solar LLC; Notice of Petition for Enforcement
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-08
... Utility Regulatory Policies Act of 1978 (PURPA), requesting the Federal Energy Regulatory Commission... contrary to the requirements of PURPA and the Commission's regulations and in violation of the Federal...
Analytical flaws and practical pitfalls: Reconsidering FERC`s merchant affiliate rules
DOE Office of Scientific and Technical Information (OSTI.GOV)
Santa, D.F. Jr.
1998-11-01
The merchant affiliate rules are a detriment not just to the regulated utility affiliate and its captive ratepayers, but even to competition in the wholesale bulk power market. The rationale underlying the merchant affiliate rules, their continued relevance, and, most importantly, their practical effect on both the utilities bound by such rules and the marketplace has not been seriously re-examined in the wake of the bulk power market`s rapid evolution. This article traces the development of the Commission`s merchant affiliate rules and reconsiders the rationale supporting the rules and the pivotal question of whether, in fact, such rules benefit utilitymore » ratepayers. The article concludes that in light of the analytical flaws and practical pitfalls surrounding the merchant affiliate rules, a balanced reevaluation of the Commission`s rules is in order.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2011-07-21
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2662-012; Project No. 12968..., Federal Energy Regulatory Commission, 888 First Street, NE., Washington, DC 20426. The Commission's Rules... gravity-type ungated spillway section with a crest elevation of 75.38 feet local datum and 30-inch wooden...
17 CFR 200.735-8 - Practice by former members and employees of the Commission.
Code of Federal Regulations, 2010 CFR
2010-04-01
... EXCHANGE COMMISSION ORGANIZATION; CONDUCT AND ETHICS; AND INFORMATION AND REQUESTS Regulation Concerning... with section 11 of the Public Utility Holding Company Act (15 U.S.C. 79k), this paragraph shall not be... interests of the Commission. 21 This definition is taken from Formal Opinion 342 of the ABA Ethics Committee...
18 CFR 35.17 - Withdrawals and amendments of rate schedule, tariff or service agreement filings.
Code of Federal Regulations, 2010 CFR
2010-04-01
... service agreement filings prior to Commission action. (1) A public utility may withdraw in its entirety a... Commission or delegated order has been issued by filing a withdrawal motion with the Commission. Upon the filing of such motion, the proposed rate schedule, tariff or service agreement sections will not become...
Commissioning of the synchrotron radiation protection system and beamlines frontends at NSLS-II
DOE Office of Scientific and Technical Information (OSTI.GOV)
Seletskiy, S., E-mail: seletskiy@bnl.gov; Amundsen, C.; Choi, J.
2016-07-27
The first eight insertion devices (IDs) at the NSLS-II were commissioned during the fall run of 2014. In this paper we discuss commissioning of the synchrotron radiation protection (SRP) system and beamline frontends (FE) for the respective IDs. We describe the diagnostics utilized if FE commissioning and a procedure that was used for the alignment of the photon beam from insertion devices in the beamline frontends. Then we discuss the current status of the SRP system and operation of the commissioned frontends.
77 FR 65880 - Information Collections Being Reviewed by the Federal Communications Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-31
... of the functions of the Commission, including whether the information shall have practical utility..., Leased Access; 76.1711, Emergency Alert System (EAS) Tests and Activation. Form Number: N/A. Type of...
Geothermal research and development program of the US Atomic Energy Commission
NASA Technical Reports Server (NTRS)
Werner, L. B.
1974-01-01
Within the overall federal geothermal program, the Atomic Energy Commission has chosen to concentrate on development of resource utilization and advanced research and technology as the areas most suitable to the expertise of its staff and that of the National Laboratories. The Commission's work in geothermal energy is coordinated with that of other agencies by the National Science Foundation, which has been assigned lead agency by the Office of Management and Budget. The objective of the Commission's program, consistent with the goals of the total federal program is to facilitate, through technological advancement and pilot plant operations, achievement of substantial commercial production of electrical power and utilization of geothermal heat by the year 1985. This will hopefully be accomplished by providing, in conjunction with industry, credible information on the economic operation and technological reliability of geothermal power and use of geothermal heat.
77 FR 1069 - Information Collection Being Reviewed by the Federal Communications Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-09
... Reduction Act (PRA) of 1995 (44 U.S.C. 3501-3520), the Federal Communications Commission invites the general... shall have practical utility; (b) the accuracy of the Commission's burden estimate; (c) ways to enhance... collection is contained in 47 U.S.C. 201, 202, 203, and 251(b)(5) of the Communications Act of 1934, as...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Moeller, J.W.
1994-01-01
The Securities and Exchange Commission (SEC) is under fire. For the past year, Congress has criticized its administration of the Public Utility Holding Company Act of 1935 (PUHCA). The criticism might persuade Congress to transfer the administration of PUHCA from the SEC to the Federal Energy Regulatory Commission (FERC). Section I of this article briefly describes the events of the past year and the implications of transfer of PUHCA from the SEC to the FERC. Section II of this article discusses the background relationship of PUHCA, under which the SEC regulates the securities transactions of public utilities, to the Federalmore » Power Act, under which the FERC regulates the rates of public utilities. Section III discusses the case involving the Ohio Power Company, which resulted in a November 1990 decision of the Supreme Court, that recently has highlighted the conflict in jurisdiction between the SEC and the FERC relative to the regulation of public utilities. Section IV discusses the immediate responses to that conflict--a proposed amendment to a FERC regulation and S. 544--and the reasons that neither response is an ideal solution. Section V proposes an alternative to those immediate responses--the Memorandum of Understanding. An Appendix is provided which proposes a draft Memorandum of Understanding between the SEC and the FERC.« less
Code of Federal Regulations, 2011 CFR
2011-10-01
... utility franchises or service territories established pursuant to state statute, state regulation, or... having applicable state-approved franchise or other service authorizations are found by the Secretary to... service, including state utility commission rulings and electric utility franchises or service territories...
Code of Federal Regulations, 2010 CFR
2010-10-01
... utility franchises or service territories established pursuant to state statute, state regulation, or... having applicable state-approved franchise or other service authorizations are found by the Secretary to... service, including state utility commission rulings and electric utility franchises or service territories...
Code of Federal Regulations, 2012 CFR
2012-10-01
... utility franchises or service territories established pursuant to state statute, state regulation, or... having applicable state-approved franchise or other service authorizations are found by the Secretary to... service, including state utility commission rulings and electric utility franchises or service territories...
Code of Federal Regulations, 2013 CFR
2013-10-01
... utility franchises or service territories established pursuant to state statute, state regulation, or... having applicable state-approved franchise or other service authorizations are found by the Secretary to... service, including state utility commission rulings and electric utility franchises or service territories...
Code of Federal Regulations, 2014 CFR
2014-10-01
... utility franchises or service territories established pursuant to state statute, state regulation, or... having applicable state-approved franchise or other service authorizations are found by the Secretary to... service, including state utility commission rulings and electric utility franchises or service territories...
ERIC Educational Resources Information Center
Jones, Thomas B.; Larson, Olaf F.
Utilizing unpublished data derived from the Roosevelt Commission on Country Life (1908), national summary reports of a 12-item questionnaire were examined and compared with the commission's published report. For purposes of analysis, the 12 questions were grouped as: (1) economic concerns, (2) farm labor, (3) services, (4) quality of life, and (5)…
10 CFR 51.121 - Status of NEPA actions.
Code of Federal Regulations, 2012 CFR
2012-01-01
... address inquiries to: (a) Utilization facilities: ATTN: Document Control Desk, Director, Office of Nuclear Reactor Regulation or Director, Office of New Reactors, as appropriate, U.S. Nuclear Regulatory Commission... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND...
10 CFR 51.121 - Status of NEPA actions.
Code of Federal Regulations, 2014 CFR
2014-01-01
... address inquiries to: (a) Utilization facilities: ATTN: Document Control Desk, Director, Office of Nuclear Reactor Regulation or Director, Office of New Reactors, as appropriate, U.S. Nuclear Regulatory Commission... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND...
10 CFR 51.121 - Status of NEPA actions.
Code of Federal Regulations, 2013 CFR
2013-01-01
... address inquiries to: (a) Utilization facilities: ATTN: Document Control Desk, Director, Office of Nuclear Reactor Regulation or Director, Office of New Reactors, as appropriate, U.S. Nuclear Regulatory Commission... NUCLEAR REGULATORY COMMISSION (CONTINUED) ENVIRONMENTAL PROTECTION REGULATIONS FOR DOMESTIC LICENSING AND...
DOE Office of Scientific and Technical Information (OSTI.GOV)
Feurer, D.A.; Weaver, C.L.; Gallagher, K.C.
1980-01-01
This report is one of a series of preliminary reports describing the laws and regulatory programs of the United States and each of the 50 states affecting the siting and operation of energy generating facilities likely to be used in Integrated Community Energy Systems (ICES). Public utility regulatory statutes, energy facility siting programs, and municipal franchising authority are examined to identify how they may impact on the ability of an organization, whether or not it be a regulated utility, to construct and operate an ICES. This report describes laws and regulatory programs in Arizona. The Arizona state constitution establishes themore » Arizona Corporation Commission to regulate public service corporations. Within the area of its jurisdiction, the Commission has exclusive power and may not be interfered with by the legislature except in one narrow instance as described in the case Corporation Commission v. Pacific Greyhound Lines.« less
76 FR 72195 - Combined Notice of Filings #3
Federal Register 2010, 2011, 2012, 2013, 2014
2011-11-22
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings 3 Take notice that the Commission received the following electric corporate filings: Docket Numbers: EC12-29-000. Applicants: Bluegrass Generation Company, L.L.C., Louisville Gas & Electric Company, Kentucky Utilities...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-10
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-110-000] Arkansas Electric Cooperative Corporation; Mississippi Delta Energy Agency; Clarksdale Public Utilities Commission.... 825(h), Arkansas Electric Cooperative Corporation, Mississippi Delta Energy Agency, and its two...
47 CFR 5.5 - Definition of terms.
Code of Federal Regulations, 2013 CFR
2013-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL EXPERIMENTAL RADIO SERVICE General § 5.5 Definition of... Commission and specified in the instrument of authorization. Experimental radio service. A service in which... communications. Experimental station. A station utilizing radio waves in experiments with a view to the...
47 CFR 5.5 - Definition of terms.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL EXPERIMENTAL RADIO SERVICE General § 5.5 Definition of... Commission and specified in the instrument of authorization. Experimental radio service. A service in which... communications. Experimental station. A station utilizing radio waves in experiments with a view to the...
10 CFR 50.30 - Filing of application; oath or affirmation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... operate, or manufacture, a production or utilization facility (including an early site permit, combined.... (e) Filing Fees. Each application for a standard design approval or production or utilization... 50.30 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION...
47 CFR 101.521 - Spectrum utilization.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Spectrum utilization. 101.521 Section 101.521 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES 24 GHz Service and Digital Electronic Message Service § 101.521 Spectrum utilization. All...
47 CFR 101.521 - Spectrum utilization.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Spectrum utilization. 101.521 Section 101.521 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES 24 GHz Service and Digital Electronic Message Service § 101.521 Spectrum utilization. All...
47 CFR 101.521 - Spectrum utilization.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 5 2013-10-01 2013-10-01 false Spectrum utilization. 101.521 Section 101.521 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO SERVICES FIXED MICROWAVE SERVICES 24 GHz Service and Digital Electronic Message Service § 101.521 Spectrum utilization. All...
NOX EMISSION CONTROL OPTIONS FOR COAL-FIRED ELECTRIC UTILITY BOILERS
The paper reviews NOx control options for coal-fired electric utility boilers. (NOTE: Acid Rain NOx regulations, the Ozone Transport Commission's NOx Budget Program, revision of the New Source Performance Standards (NSPS) for NOx emissions from utility sources, and Ozone Transpor...
10 CFR 34.71 - Utilization logs.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Utilization logs. 34.71 Section 34.71 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.71 Utilization logs. (a) Each licensee shall maintain...
10 CFR 34.71 - Utilization logs.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Utilization logs. 34.71 Section 34.71 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.71 Utilization logs. (a) Each licensee shall maintain...
10 CFR 34.71 - Utilization logs.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Utilization logs. 34.71 Section 34.71 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.71 Utilization logs. (a) Each licensee shall maintain...
10 CFR 34.71 - Utilization logs.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Utilization logs. 34.71 Section 34.71 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.71 Utilization logs. (a) Each licensee shall maintain...
10 CFR 34.71 - Utilization logs.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Utilization logs. 34.71 Section 34.71 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC OPERATIONS Recordkeeping Requirements § 34.71 Utilization logs. (a) Each licensee shall maintain...
18 CFR 35.26 - Recovery of stranded costs by public utilities and transmitting utilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... the customer with the Commission. (A) Before marketing or brokering can begin, the utility and... associated energy the customer is entitled to schedule, and the duration of the customer's marketing or... section to exercise the marketing or brokering option. The customer must notify the utility in writing...
ENGINEERING MANPOWER BULLETIN NUMBER 9.
ERIC Educational Resources Information Center
ALDEN, JOHN D.
DESIGNED TO INFORM LEADERS IN INDUSTRY, GOVERNMENT, AND EDUCATION, WHOSE RESPONSIBILITY INCLUDES AWARENESS OF ENGINEERING MANPOWER DEVELOPMENTS, THIS BULLETIN REPORTS A STUDY CONDUCTED BY THE ENGINEERING MANPOWER COMMISSION OF ENGINEERS IN THE ARMED SERVICES. THE WORK OF THE COMMISSION IS TO ASSURE THE MOST EFFECTIVE UTILIZATION OF ENGINEERING…
MENU OF NOX EMISSION CONTROL OPTIONS FOR COAL-FIRED ELECTRIC UTILITY BOILERS
The paper reviews NOx control options for coal-fired electric utility boilers. (NOTE: Acid Rain NOx regulations, the Ozone Transport Commission's NOx Budget Program, revision of the New Source Performance Standards (NSPS) for NOx emissions from utility sources, and Ozone Transpor...
78 FR 53742 - Commission Information Collection Activities (Ferc-582); Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-30
... commerce. Respondents (public utilities, power marketers) subject to these annual charges must submit FERC.... Type of Respondents: Public utilities and power marketers. Estimate of Annual Burden: \\8\\ The...
78 FR 47310 - Commission Information Collection Activities (FERC-582); Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-05
... energy in interstate commerce. Respondents (public utilities, power marketers) subject to these annual... charge. \\6\\ 18 CFR 381 and 382. Type of Respondents: Public utilities and power marketers. Estimate of...
10 CFR 50.52 - Combining licenses.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Combining licenses. 50.52 Section 50.52 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of Licenses and Construction Permits § 50.52 Combining licenses. The Commission may combine in a...
10 CFR 50.37 - Agreement limiting access to Classified Information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... Section 50.37 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... or the issuance of a license, construction permit, early site permit, or standard design approval, or before the Commission has adopted a final standard design certification rule under part 52 of this...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Policy. 7.1 Section 7.1 Energy NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEES § 7.1 Policy. The regulations in this part define the policies and procedures to be followed by the Nuclear Regulatory Commission in the establishment, utilization, and...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Policy. 7.1 Section 7.1 Energy NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEES § 7.1 Policy. The regulations in this part define the policies and procedures to be followed by the Nuclear Regulatory Commission in the establishment, utilization, and...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Policy. 7.1 Section 7.1 Energy NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEES § 7.1 Policy. The regulations in this part define the policies and procedures to be followed by the Nuclear Regulatory Commission in the establishment, utilization, and...
Report of the National Advisory Commission on Health Manpower. Volume 1.
ERIC Educational Resources Information Center
National Advisory Commission on Health Manpower, Washington, DC.
In 1966, the President established the National Advisory Commission on Health Manpower to "develop appropriate recommendations for action by government or by private institutions, organizations, or individuals for improving the availability and utilization of health manpower." Recommendations include: (1) federal funds to encourage…
75 FR 30008 - Commission Information Collection Activities; Comment Request; Extension
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-28
... by requiring public utilities, working through the North American Electric Reliability Corporation.... The Commission required a NERC/NAESB \\2\\ team to draft and review Order No. 890 reliability standards... NERC, were to revise reliability standards to require the exchange of data and coordination among...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Policy. 7.1 Section 7.1 Energy NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEES § 7.1 Policy. The regulations in this part define the policies and procedures to be followed by the Nuclear Regulatory Commission in the establishment, utilization, and...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Policy. 7.1 Section 7.1 Energy NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEES § 7.1 Policy. The regulations in this part define the policies and procedures to be followed by the Nuclear Regulatory Commission in the establishment, utilization, and...
Determining the structure of an optimal personnel profile for a transformed commission
DOE Office of Scientific and Technical Information (OSTI.GOV)
Graniere, R.J.
1998-06-01
In the classic sociological sense, an organization such as a public utility commission is a social unit consisting of specific groupings constructed and reconstructed deliberately and with forethought to achieve specific goals. These organizational groupings determined on the basis of rational divisions of labor, power, and communication are designed with the objective of placing individuals into positions where they are expected to make the largest contribution towards achieving the organization`s goals. It is reasonable then to conclude that proponents of the classical view had in mind a readily identifiable common ground among the organization`s members that the organization exploits asmore » it selects its goals. Recently, it has been argued that metaphors are an acceptable shorthand for this common ground that provides an insight into the types of personnel an organization would find most suitable for assisting its efforts to reach its goals. This report is one of a series of reports on the transformation of public utility commissions. Previous reports in the series have focused on the transformation of a commission`s culture, roles, and activities. This report focuses on the staffing dimension of the personnel mix needed to support these changes.« less
Code of Federal Regulations, 2010 CFR
2010-04-01
....310 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 REGULATIONS UNDER SECTIONS... PRODUCTION AND COGENERATION Arrangements Between Electric Utilities and Qualifying Cogeneration and Small...
Appalachian Regional Commission: 1979 Annual Report.
ERIC Educational Resources Information Center
Appalachian Regional Commission, Washington, DC.
Narrative text, tables, maps, and photographs present an overview of the Appalachian Regional Commission's (ARC) activities in fiscal year 1979, past achievements, and future goals. Major accomplishments of 1979 include: utilization of the $233 million appropriation for highway construction; approval of over $143 million in ARC funds for 985…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-10-29
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-84-001] Californians for Renewable Energy, Inc. (CARE) v. Pacific Gas and Electric Company, Southern California Edison Company, San Diego Gas & Electric Company, California Public Utilities Commission; Notice of Amended...
78 FR 19409 - Annual Charge Filing Procedures for Natural Gas Pipelines
Federal Register 2010, 2011, 2012, 2013, 2014
2013-04-01
...; Order No. 776] Annual Charge Filing Procedures for Natural Gas Pipelines AGENCY: Federal Energy... Commission (Commission or FERC) is amending its regulations to revise the filing requirements for natural gas...) clause. Currently, natural gas pipelines utilizing an ACA clause must make an annual tariff filing to...
18 CFR 131.31 - FERC Form No. 561, Annual report of interlocking positions.
Code of Federal Regulations, 2013 CFR
2013-04-01
... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, FEDERAL POWER ACT AND PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 FORMS § 131.31 FERC Form No. 561, Annual report of interlocking... the Federal Energy Regulatory Commission's staff for the review and oversight of interlocking...
18 CFR 131.31 - FERC Form No. 561, Annual report of interlocking positions.
Code of Federal Regulations, 2012 CFR
2012-04-01
... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, FEDERAL POWER ACT AND PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 FORMS § 131.31 FERC Form No. 561, Annual report of interlocking... the Federal Energy Regulatory Commission's staff for the review and oversight of interlocking...
18 CFR 131.31 - FERC Form No. 561, Annual report of interlocking positions.
Code of Federal Regulations, 2014 CFR
2014-04-01
... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, FEDERAL POWER ACT AND PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 FORMS § 131.31 FERC Form No. 561, Annual report of interlocking... the Federal Energy Regulatory Commission's staff for the review and oversight of interlocking...
18 CFR 131.31 - FERC Form No. 561, Annual report of interlocking positions.
Code of Federal Regulations, 2011 CFR
2011-04-01
... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY APPROVED FORMS, FEDERAL POWER ACT AND PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 FORMS § 131.31 FERC Form No. 561, Annual report of interlocking... the Federal Energy Regulatory Commission's staff for the review and oversight of interlocking...
Code of Federal Regulations, 2012 CFR
2012-01-01
... determines that adjournment is in the public interest. The Commission, in its discretion, may authorize the... shall be open to the public. Subcommittees and subgroups that are not utilized by the Commission for the... completely or partly open to the public shall be held at reasonable times and at places that are reasonably...
Code of Federal Regulations, 2013 CFR
2013-01-01
... determines that adjournment is in the public interest. The Commission, in its discretion, may authorize the... shall be open to the public. Subcommittees and subgroups that are not utilized by the Commission for the... completely or partly open to the public shall be held at reasonable times and at places that are reasonably...
Code of Federal Regulations, 2014 CFR
2014-01-01
... determines that adjournment is in the public interest. The Commission, in its discretion, may authorize the... shall be open to the public. Subcommittees and subgroups that are not utilized by the Commission for the... completely or partly open to the public shall be held at reasonable times and at places that are reasonably...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-09-07
... Commission in the Public Reference Room or may be viewed on the Commission's Web site at http:[sol][sol]www... http:[sol][sol]www.ferc.gov/docs- filing/esubscription.asp to be notified via e-mail of new filings and...
77 FR 2542 - Information Collection Being Reviewed by the Federal Communications Commission
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-18
...; (b) the accuracy of the Commission's burden estimate; (c) ways to enhance the quality, utility, and... set-aside capacity is available; (c) Rates associated with technical and studio costs; (d) If... billing and collection services to leased access programmers unless they can demonstrate the existence of...
10 CFR 50.101 - Retaking possession of special nuclear material.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Retaking possession of special nuclear material. 50.101 Section 50.101 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... Operations by the Commission § 50.101 Retaking possession of special nuclear material. Upon revocation of a...
10 CFR 50.101 - Retaking possession of special nuclear material.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Retaking possession of special nuclear material. 50.101 Section 50.101 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... Operations by the Commission § 50.101 Retaking possession of special nuclear material. Upon revocation of a...
10 CFR 50.101 - Retaking possession of special nuclear material.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Retaking possession of special nuclear material. 50.101 Section 50.101 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... Operations by the Commission § 50.101 Retaking possession of special nuclear material. Upon revocation of a...
10 CFR 50.101 - Retaking possession of special nuclear material.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Retaking possession of special nuclear material. 50.101 Section 50.101 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... Operations by the Commission § 50.101 Retaking possession of special nuclear material. Upon revocation of a...
10 CFR 50.101 - Retaking possession of special nuclear material.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Retaking possession of special nuclear material. 50.101 Section 50.101 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... Operations by the Commission § 50.101 Retaking possession of special nuclear material. Upon revocation of a...
Code of Federal Regulations, 2010 CFR
2010-01-01
... determines that adjournment is in the public interest. The Commission, in its discretion, may authorize the... shall be open to the public. Subcommittees and subgroups that are not utilized by the Commission for the... completely or partly open to the public shall be held at reasonable times and at places that are reasonably...
Code of Federal Regulations, 2011 CFR
2011-01-01
... determines that adjournment is in the public interest. The Commission, in its discretion, may authorize the... shall be open to the public. Subcommittees and subgroups that are not utilized by the Commission for the... completely or partly open to the public shall be held at reasonable times and at places that are reasonably...
76 FR 11464 - Sunshine Act Meeting; Open Commission Meeting; Thursday, March 3, 2011
Federal Register 2010, 2011, 2012, 2013, 2014
2011-03-02
... functional equivalent of Tribal Lands and to Tribal Lands that are small or irregularly shaped; and to adjust... Nations on their lands. 2 Wireless Title: Improving Communications Services Telecommunications. for Native Nations by Promoting Greater Utilization of Spectrum Over Tribal Lands. Summary: The Commission will...
25 CFR 700.187 - Utilization of replacement home benefits.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 25 Indians 2 2012-04-01 2012-04-01 false Utilization of replacement home benefits. 700.187 Section... PROCEDURES Replacement Housing Payments § 700.187 Utilization of replacement home benefits. The Commission... to the head of household as provided in these regulations for the acquisition of a replacement home...
25 CFR 700.187 - Utilization of replacement home benefits.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 25 Indians 2 2013-04-01 2013-04-01 false Utilization of replacement home benefits. 700.187 Section... PROCEDURES Replacement Housing Payments § 700.187 Utilization of replacement home benefits. The Commission... to the head of household as provided in these regulations for the acquisition of a replacement home...
25 CFR 700.187 - Utilization of replacement home benefits.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 25 Indians 2 2011-04-01 2011-04-01 false Utilization of replacement home benefits. 700.187 Section... PROCEDURES Replacement Housing Payments § 700.187 Utilization of replacement home benefits. The Commission... to the head of household as provided in these regulations for the acquisition of a replacement home...
25 CFR 700.187 - Utilization of replacement home benefits.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 25 Indians 2 2010-04-01 2010-04-01 false Utilization of replacement home benefits. 700.187 Section... PROCEDURES Replacement Housing Payments § 700.187 Utilization of replacement home benefits. The Commission... to the head of household as provided in these regulations for the acquisition of a replacement home...
25 CFR 700.187 - Utilization of replacement home benefits.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 25 Indians 2 2014-04-01 2014-04-01 false Utilization of replacement home benefits. 700.187 Section... PROCEDURES Replacement Housing Payments § 700.187 Utilization of replacement home benefits. The Commission... to the head of household as provided in these regulations for the acquisition of a replacement home...
77 FR 10501 - Northeast Utilities Service Company; Notice of Petition for Declaratory Order
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-22
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-25-000] Northeast Utilities Service Company; Notice of Petition for Declaratory Order Take notice that on February 8, 2012, Northeast Utilities Service Company (NUSCO), on behalf of the Connecticut Light and Power Company, Public...
Alaska | Midmarket Solar Policies in the United States | Solar Research |
developers may offer community solar programs. State Incentive Programs Program Administrator Incentive decisions. Utility Incentive Programs Check with local utilities for midscale solar incentives. Resources and utility policies and incentive programs. Net Metering and Interconnection Regulatory Commission of
17 CFR 250.49 - Certain exemptions granted to non-utility subsidiaries.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Certain exemptions granted to non-utility subsidiaries. 250.49 Section 250.49 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) GENERAL RULES AND REGULATIONS, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935...
1987-12-01
occupation group, category (i.e., strength, loss, etc.), years of commissioned service (YCS), grade, occupation, source of commission, education, sex ...OF MCORP OUTPUT OCCUPATION GROUP: All CAT: Strength YCS: 01 - 09 GRADE: All Unrestricted Officers OCCUPATION: All SOURCE: All EDUCATION: All SEX : All...source of commission, sex , MOS, GCT, and other pertinent variables such as the performance index. A Probit or Logit model could be utilized. The variables
DOE Office of Scientific and Technical Information (OSTI.GOV)
O`Driscoll, M.
The Federal Energy Regulatory Commission`s transmission pricing policy signals acceptance of what previously had been taboo: any departure from the embedded cost, postage-stamp rates that have characterized transmission pricing for decades but are becoming increasingly difficult to deal with as the power industry develops a more competitive profile. The transmission pricing policy gives the electric utility industry the flexibility it wants but, the utilities must provide comparability of pricing - an extension of the golden rule of transmission access to transmission pricing. Comparability of service applies to price as well as to terms and conditions. But, the commission said, pricingmore » comparability does not mean all customers should pay the same price. FERC said it supports proposals that disaggregate costs in order to give better price signals to all users of the system, third parties and the transmission owner itself.« less
Commissioning a materials research laboratory
DOE Office of Scientific and Technical Information (OSTI.GOV)
SAVAGE,GERALD A.
2000-03-28
This presentation covers the process of commissioning a new 150,000 sq. ft. research facility at Sandia National Laboratories. The laboratory being constructed is a showcase of modern design methods being built at a construction cost of less than $180 per sq. ft. This is possible in part because of the total commissioning activities that are being utilized for this project. The laboratory's unique approach to commissioning will be presented in this paper. The process will be followed through from the conceptual stage on into the actual construction portion of the laboratory. Lessons learned and cost effectiveness will be presented inmore » a manner that will be usable for others making commissioning related decisions. Commissioning activities at every stage of the design will be presented along with the attributed benefits. Attendees will hear answers to the what, when, who, and why questions associated with commissioning of this exciting project.« less
Unbundling of electric power and energy services
DOE Office of Scientific and Technical Information (OSTI.GOV)
Keith, D.M.; Lewis, B.R.
1996-12-31
The world-wide movement to restructure the electric and power and energy industry is now well underway in the United States. The most recent thrust came this year, with the Federal Energy Regulatory Commission`s (FERC`s) issuance on April 24th of new regulations designed to open the interconnected transmission grid to all qualified wholesale users. Other movements have been in the many forms of earlier statutes and regulations promulgated in 1978 to make more efficient use of fuels burned; utility diversification efforts; utility creation of affiliate and subsidiary organizations and operations; introduction into the market of private non-utility power developers; utilities obtainingmore » clearance from the Securities and Exchange Commission (SEC) to venture in international markets; massive mergers and acquisitions; bankruptcies; the entry into the market of nonutility power marketers and brokers, including entities from the gas and securities industries not previously involved in the electric power and energy industry; additional congressional consideration of outright repeal of Holding Company legislation dating back to 1935; some states entering into an era of abandoning the control past in favor of complete re-regulation of the industry on the basis of performance; the coming of Independent System Operators (ISO`s), Regional Transmission Groups (RTG`s), and the possible coming of Capacity Reservation Tariffs (CRT`s), to name a few.« less
75 FR 38803 - Combined Notice of Filings #1
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-06
.... Applicants: PPL Electric Utilities Corporation. Description: PECO Energy Company submits Notice of.... Applicants: PPL Electric Utilities Corporation. Description: PECO Energy Company submits Transmission... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Combined Notice of Filings 1 June 25...
Utility accommodation policy of the Iowa State Highway Commission.
DOT National Transportation Integrated Search
1970-05-01
This policy covers initial placement, adjustment, relocation and : replacement of utility facilities in, on, above or below all highway : rightof way over:Wnicn tneiowa.~state :Hig'hwaycommission exercises : control of access. It embodies the bas...
Allowance trading activity and state regulatory rulings: Evidence from the US Acid Rain Program
DOE Office of Scientific and Technical Information (OSTI.GOV)
Bailey, E.M.
1997-12-31
The US Acid Rain Program is one of the first, and by far the most extensive, applications of a market based approach to pollution control. From the beginning, there has been concern whether utilities would participate in allowance trading, and whether regulatory activity at the state level would further complicate utilities` decision to trade allowances. This paper finds that public utility commission regulation has encouraged allowance trading activity in states with regulatory rulings, but that allowance trading activity has not been limited to states issuing regulations. Until there is evidence suggesting that significant additional cost savings could have been obtainedmore » if additional allowance trading activity had occurred in states without regulations or that utilities in states with regulations are still not taking advantage of all cost saving trading opportunities, this analysis suggests that there is little reason to believe that allowance trading activity is impeded by public utility commission regulations.« less
77 FR 41481 - Integration of Variable Energy Resources
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-13
...The Federal Energy Regulatory Commission is amending the pro forma Open Access Transmission Tariff to remove unduly discriminatory practices and to ensure just and reasonable rates for Commission- jurisdictional services. Specifically, this Final Rule removes barriers to the integration of variable energy resources by requiring each public utility transmission provider to: offer intra-hourly transmission scheduling; and, incorporate provisions into the pro forma Large Generator Interconnection Agreement requiring interconnection customers whose generating facilities are variable energy resources to provide meteorological and forced outage data to the public utility transmission provider for the purpose of power production forecasting.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-03
... requirements of FERC-716 (``Good Faith Request for Transmission Service and Response by Transmitting Utility..., provide standards by which the Commission determines if and when a valid good faith request for... 12 components of a good faith estimate and 5 components of a reply to a good faith request. Action...
78 FR 1854 - Minnesota Energy Resources Corporation; Notice of Petition for Rate Approval
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-09
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. PR13-21-000] Minnesota..., Minnesota Energy Resources Corporation (MERC) filed a rate election pursuant to section 284.123(b)(1) of the... that conform to the recently revised rates approved by the Minnesota Public Utilities Commission, as...
Nuclear Regulatory Commission issuances. Volume 47, Number 2
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1998-02-01
This report includes the issuances received during the specified period from the Commission (CLI), the Atomic Safety and Licensing Boards (LBP), the Administrative Law Judges (ALJ), the Directors` Decisions (DD), and the Decisions on Petitions for Rulemaking (DPRM). They involve: 21st Century Technologies, Inc.; Hydro Resources, Inc.; Northeast Utilities; and Northern States Power Company.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-12
... unless it displays a currently valid OMB control number. No person shall be subject to any penalty for... not display a valid OMB control number. DATES: Written Paperwork Reduction Act (PRA) comments should... information shall have practical utility; the accuracy of the Commission's burden estimate; ways to enhance...
Annual Report of the South Carolina Commission on Higher Education.
ERIC Educational Resources Information Center
South Carolina Commission on Higher Education, Columbia.
The South Carolina Commission on Higher Education submits its report on significant events of the last year and reports briefly on the following: (1) enrollment information for the colleges and universities; (2) establishment of the Student Intern Program of S.C. designed to utilize qualified college and university students on specific projects of…
J.G. Isebrands; J. Richardson
2000-01-01
Research results and ongoing research activities on poplar and willow breeding, diseases, insects, production, and utilization are described in 220 abstracts from the International Poplar Commission meeting in Vancouver, Washington, September 24-28, 2000.
76 FR 23516 - Availability of E-Tag Information to Commission Staff
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-27
... reference into its regulations and public utility tariffs by the Commission.\\8\\ \\6\\ NERC's Glossary of Terms... boundaries.'' See http://www.nerc.com/files/Glossary_2009April20.pdf (page 10 of 21) (last visited on March... . Phone: (202) 502-8663, fax: (202) 273-0873. 25. Comments concerning the information collections proposed...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-19
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. ER13-1667-000] Battery Utility of Ohio, LLC; Supplemental Notice That Initial Market-Based Rate Filing Includes Request for... Battery Utility of Ohio, LLC's application for market-based rate authority, with an accompanying rate...
17 CFR 250.7 - Companies deemed not to be electric or gas utility companies.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Companies deemed not to be electric or gas utility companies. 250.7 Section 250.7 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION (CONTINUED) GENERAL RULES AND REGULATIONS, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935...
22 CFR 130.17 - Utilization of and access to reports and records.
Code of Federal Regulations, 2012 CFR
2012-04-01
...)), and reports based upon such information will be submitted to Congress in accordance with sections 36(a... 22 Foreign Relations 1 2012-04-01 2012-04-01 false Utilization of and access to reports and... REGULATIONS POLITICAL CONTRIBUTIONS, FEES AND COMMISSIONS § 130.17 Utilization of and access to reports and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-24
... Wind Power, LLC (Complainant) filed a formal complaint against Montana-Dakota Utilities Company, a... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL10-41-000] Tatanka Wind Power, LLC, Complainant, v. Montana-Dakota Utilities Company, a Division of MDU Resources Group, Inc...
17 CFR 210.3A-05 - Special requirements as to public utility holding companies.
Code of Federal Regulations, 2010 CFR
2010-04-01
... Consolidated and Combined Financial Statements § 210.3A-05 Special requirements as to public utility holding companies. There shall be shown in the consolidated balance sheet of a public utility holding company the... SECURITIES AND EXCHANGE COMMISSION FORM AND CONTENT OF AND REQUIREMENTS FOR FINANCIAL STATEMENTS, SECURITIES...
Utility accommodation policy of the Iowa State Highway Commission.
DOT National Transportation Integrated Search
1973-02-01
This policy covers. initial placement, adjustment, relocation and : replacement of utility facilities in, on., above or below all highway : right of way over which the Iowa State Highway Corninission exe:tcii:les : cont.rol of access. It embodies the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-06
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2662-012-CT; Project No. 12968-001-CT] FirstLight Hydro Generating Company, City of Norwich Dept. of Public Utilities; Notice of...Light Hydro Generating Company and the City of Norwich Dept. of Public Utilities to discuss the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-27
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2149-152] Public Utility District No. 1 of Douglas County; Notice of Intent To Prepare an Environmental Impact Statement December 16, 2010. On May 27, 2010, Public Utility District No. 1 of Douglas County filed an application for the...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-26
... Gresham, Wisconsin, Attn: Art Bahr, Village Administrator, 1126 Main Street, PO Box 50, Gresham, WI 54128... of the Commission's regulations, if any resource agency, Indian Tribe, or person believes that an... analysis of the application on its merit, the resource agency, Indian Tribe, or person must file a request...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-04-26
... enhance the quality, utility, and clarity of the information collected; (d) ways to minimize the burden of..., TV Broadcast Receivers. Form Number: N/A. Type of Review: Extension of a currently approved... Commission's rules requires sellers of TV sets (and other TV receiver equipment) that do not contain a...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-01
.... Midwest Independent Transmission System Operator, Inc.; Great Lakes Utilities, Indiana Municipal Power Agency, Missouri Joint Municipal Electric Utility Commission, Missouri River Energy Services, Prairie... Independent Transmission System Operator, Operator, Inc.; Wabash Valley Power Association, Inc. v. Midwest...
MINIMIZING THE VULNERABILITY OF WATER SUPPLIES TO NATURAL AND TERRORIST THREATS
There is increasing concern that drinking water utilities may be vulnerable to attacks by terrorists. In the US the President's Commission on Critical Infrastructure Protection has concluded the US drinking water utilities are vulnerable to physical, cyber and biological terroris...
Rosebud Sioux Wind Energy Project
DOE Office of Scientific and Technical Information (OSTI.GOV)
Tony Rogers
2008-04-30
In 1998, through the vision of the late Alex “Little Soldier” Lunderman (1928-2000) and through the efforts of the Rosebud Sioux Tribal Utilities Commission, and with assistance from Intertribal Council on Utility Policy (COUP), and Distributed Generation, Inc (DISGEN). The Rosebud Sioux Tribe applied and was awarded in 1999 a DOE Cooperative Grant to build a commercial 750 Kw wind turbine, along with a 50/50 funding grant from the Department of Energy and a low interest loan from the Rural Utilities Service, United States Department of Agriculture, the Rosebud Sioux Tribe commissioned a single 750 kilowatt NEG Micon wind turbinemore » in March of 2003 near the Rosebud Casino. The Rosebud Sioux Wind Energy Project (Little Soldier “Akicita Cikala”) Turbine stands as a testament to the vision of a man and the Sicangu Oyate.« less
Program Evaluation Grant. Final Report.
ERIC Educational Resources Information Center
Quadco Rehabilitation Center, Inc., Stryker, OH.
The purpose of the project was to increase the effectiveness and efficiency of those rehabilitation facilities which were utilized by the Ohio Rehabilitation Services Commission (RSC) through the development, installation, and utilization of a program evaluation system and a management information system. The two systems were developed and…
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-15
..., Washington, and has prepared a final environmental assessment (FEA) in cooperation with the U.S. Department of Energy (DOE/EA-1949). In the FEA, Commission staff analyzed the potential environmental effects of... of the human environment. A copy of the FEA is available for review at the Commission in the Public...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-11-08
... shall have practical utility; the accuracy of the Commission's burden estimate; ways to enhance the...: Required to obtain or retain benefits. The statutory authority for this collections is contained in 47 U.S. C. 154(i), 157(a), 301, 303(c), 303(f), 303(g), 303(r), 308, and 309(j). Total Annul Burden: 36...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-11
... to 230 kV; (8) two 41-miles- long 230-kV single-circuit transmission lines running parallel to each.... terms and conditions, and fishway prescriptions. Commission issues Draft EA April 2011. Comments on Draft EA May 2011. Modified Terms and Conditions June 2011. Commission Issues Final EA September 2011. o...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-10
...As part of its continuing effort to reduce paperwork burden and as required by the Paperwork Reduction Act (PRA) of 1995, the Federal Communications Commission invites the general public and other Federal agencies to comment on the following information collection. Comments are requested concerning: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information shall have practical utility; (b) the accuracy of the Commission's burden estimate; (c) ways to enhance the quality, utility, and clarity of the information collected; (d) ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology; and (e) ways to further reduce the information collection burden for small business concerns with fewer than 25 employees. The FCC may not conduct or sponsor a collection of information unless it displays a currently valid OMB control number. No person shall be subject to any penalty for failing to comply with a collection of information subject to the Paperwork Reduction Act (PRA) that does not display a valid OMB control number.
Developer handbook for Section 210 of PURPA for Vermont
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vanacore, J.
The essential element of the Public Utility Regulatory Policies Act of 1978 (PURPA) for developers is a reordering by Congress of the relationship between electric utilities and small power producers. The goal of PURPA is to encourage development of alternative sources of electricity by helping small power production become economically viable. The strategy adopted by Congress for encouraging development has two main components. First, the utility must purchase the power produced by a project meeting certain definitional requirements; and second, the utility must pay a price for the power, determined in accordance with guidelines set out in the FERC regulations.more » This handbook is designed to explain to developers in Vermont the requirements of PURPA, including: who may qualify for treatment as a facility that may invoke the mandates of PURPA; the impact of PURPA on the state; the role of the state utility commission and the impact of state laws on the developer. Thus, the primary goal of the handbook is to provide potential small producers with a working understanding of their status and rights vis a vis the state utility commissions and electric utilities, and to aid the potential developer in obtaining the information needed to stimulate further research and development.« less
Developer handbook for Section 210 of PURPA for New Hampshire
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wersan, D.; O'Connell, J.
The essential element of the Public Utility Regulatory Policies Act of 1979 (PURPA) for developers is a reordering by Congress of the relationship between electric utilities and small power producers. The goal of PURPA is to encourage development of alternative sources of electricity by helping small power production become economically viable. The strategy adopted by Congress for encouraging development has two main components. First, the utility must purchase the power produced by a project meeting certain definitional requirements; and second, the utility must pay a price for the power, determined in accordance with guidelines set out in the FERC regulations.more » This handbook is designed to explain to developers in New Hampshire the requirements of PURPA, including: who may qualify for treatment as a facility that may invoke the mandates of PURPA; the impact of PURPA on the state; the role of the state utility commission and the impact of state laws on the developer. Thus, the primary goal of the handbook is to provide potential small producers with a working understanding of their status and rights vis a vis the state utility commissions and electric utilities, and to aid the potential developer in obtaining the information needed to stimulate further research and development.« less
Developer handbook for Section 210 of PURPA for Massachusetts
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vanacore, J.
The essential element of the Public Utility Regulatory Policies Act of 1978 (PURPA) for developers is a reordering by Congress of the relationship between electric utilities and small power producers. The goal of PURPA is to encourage development of alternative sources of electricity by helping small power production become economically viable. The strategy adopted by Congress for encouraging development has two main components. First, the utility must purchase the power produced by a project meeting certain definitional requirements; and second, the utility must pay a price for the power, determined in accordance with guidelines set out in the FERC regulations.more » This handbook is designed to explain to developers in Massachusetts the requirements of PURPA, including: who may qualify for treatment as a facility that may invoke the mandates of PURPA; the impact of PURPA on the state; the role of the state utility commission and the impact of state laws on the developer. Thus, the primary goal of the handbook is to provide potential small producers with a working understanding of their status and rights vis a vis the state utility commissions and electric utilities, and to aid the potential developer in obtaining the information needed to stimulate further research and development.« less
Developer handbook for Section 210 of PURPA for Oregon
DOE Office of Scientific and Technical Information (OSTI.GOV)
Vanacore, J.; Forbes, K.
The essential element of the Public Utility Regulatory Policies Act of 1978 (PURPA) for developers is a reordering by Congress of the relationship between electric utilities and small power producers. The goal of PURPA is to encourage development of alternative sources of electricity by helping small power production become economically viable. The strategy adopted by Congress for encouraging development has two main components. First, the utility must purchase the power produced by a project meeting certain definitional requirements; and second, the utility must pay a price for the power, determined in accordance with guidelines set out in the FERC regulations.more » This handbook is designed to explain to developers in Oregon the requirements of PURPA, including: who may qualify for treatment as a facility that may invoke the mandates of PURPA; the impact of PURPA on the state; the role of the state utility commission and the impact of state laws on the developer. Thus, the primary goal of the handbook is to provide potential small producers with a working understanding of their status and rights vis a vis the state utility commissions and electric utilities, and to aid the potential developer in obtaining the information needed to stimulate further research and development.« less
Developer handbook for Section 210 of PURPA for New York
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The essential element of the Public Utility Regulatory Policies Act of 1978 (PURPA) for developers is a reordering by Congress of the relationship between electric utilities and small power producers. The goal of PURPA is to encourage development of alternative sources of electricity by helping small power production become economically viable. The strategy adopted by Congress for encouraging development has two main components. First, the utility must purchase the power produced by a project meeting certain definitional requirements; and second, the utility must pay a price for the power, determined in accordance with guidelines set out in the FERC regulations.more » This handbook is designed to explain to developers in New York the requirements of PURPA, including: who may qualify for treatment as a facility that may invoke the mandates of PURPA; the impact of PURPA on the state; the role of the state utility commission and the impact of state laws on the developer. Thus, the primary goal of the handbook is to provide potential small producers with a working understanding of their status and rights vis a vis the state utility commissions and electric utilities, and to aid the potential developer in obtaining the information needed to stimulate further research and development.« less
Developer handbook for Section 210 of PURPA for Georgia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The essential element of the Public Utility Regulatory Policies Act of 1978 (PURPA) for developers is a reordering by Congress of the relationship between electric utilities and small power producers. The goal of PURPA is to encourage development of alternative sources of electricity by helping small power production become economically viable. The strategy adopted by Congress for encouraging development has two main components. First, the utility must purchase the power produced by a project meeting certain definitional requirements; and second, the utility must pay a price for the power, determined in accordance with guidelines set out in the FERC regulations.more » This handbook is designed to explain to developers in Georgia the requirements of PURPA, including: who may qualify for treatment as a facility that may invoke the mandates of PURPA; the impact of PURPA on the state; the role of the state utility commission and the impact of state laws on the developer. Thus, the primary goal of the handbook is to provide potential small producers with a working understanding of their status and rights vis a vis the state utility commissions and electric utilities, and to aid the potential developer in obtaining the information needed to stimulate further research and development.« less
Developer handbook for Section 210 of PURPA for the Tennessee Valley Authority
DOE Office of Scientific and Technical Information (OSTI.GOV)
Wersan, D.; Dabuliewicz, J.
The essential element of the Public Utility Regulatory Policies Act of 1978 (PURPA) for developers is a reordering by Congress of the relationship between electric utilities and small power producers. The goal of PURPA is to encourage development of alternative sources of electricity by helping small power production become economically viable. The strategy adopted by Congress for encouraging development has two main components. First, the utility must purchase the power produced by a project meeting certain definitional requirements; and second, the utility must pay a price for the power, determined in accordance with guidelines set out in the FERC regulations.more » This handbook is designed to explain to developers in the Tennessee Valley Region the requirements of PURPA, including: who may qualify for treatment as a facility that may invoke the mandates of PURPA; the impact of PURPA on the state; the role of the state utility commission and the impact of state laws on the developer. Thus, the primary goal of the handbook is to provide potential small producers with a working understanding of their status and rights vis a vis the state utility commissions and electric utilities, and to aid the potential developer in obtaining the information needed to stimulate further research and development.« less
Developer handbook for Section 210 of PURPA for Virginia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The essential element of the Public Utility Regulatory Policies Act of 1978 (PURPA) for developers is a reordering by Congress of the relationship between electric utilities and small power producers. The goal of PURPA is to encourage development of alternative sources of electricity by helping small power production become economically viable. The strategy adopted by Congress for encouraging development has two main components. First, the utility must purchase the power produced by a project meeting certain definitional requirements; and second, the utility must pay a price for the power, determined in accordance with guidelines set out in the FERC regulations.more » This handbook is designed to explain to developers in Virginia the requirements of PURPA, including: who may qualify for treatment as a facility that may invoke the mandates of PURPA; the impact of PURPA on the state; the role of the state utility commission and the impact of state laws on the developer. Thus, the primary goal of the handbook is to provide potential small producers with a working understanding of their status and rights vis a vis the state utility commissions and electric utilities, and to aid the potential developer in obtaining the information needed to stimulate further research and development.« less
Developer handbook for Section 210 of PURPA for Montana
DOE Office of Scientific and Technical Information (OSTI.GOV)
Baker, C.
The essential element of the Public Utility Regulatory Policies Act of 1978 (PURPA) for developers is a reordering by Congress of the relationship between electric utilities and small power producers. The goal of PURPA is to encourage development of alternative sources of electricity by helping small power production become economically viable. The strategy adopted by Congress for encouraging development has two main components. First, the utility must purchase the power produced by a project meeting certain definitional requirements; and second, the utility must pay a price for the power, determined in accordance with guidelines set out in the FERC regulations.more » This handbook is designed to explain to developers in Montana the requirements of PURPA, including: who may qualify for treatment as a facility that may invoke the mandates of PURPA; the impact of PURPA on the state; the role of the state utility commission and the impact of state laws on the developer. Thus, the primary goal of the handbook is to provide potential small producers with a working understanding of their status and rights vis a vis the state utility commissions and electric utilities, and to aid the potential developer in obtaining the information needed to stimulate further research and development.« less
Developer handbook for Section 210 of PURPA for North Carolina
DOE Office of Scientific and Technical Information (OSTI.GOV)
Whitelaw, J.; Getz, T.B.
The essential element of the Public Utility Regulatory Policies Act of 1978 (PURPA) for developers is a reordering by Congress of the relationship between electric utilities and small power producers. The goal of PURPA is to encourage development of alternative sources of electricity by helping small power production become economically viable. The strategy adopted by Congress for encouraging development has two main components. First, the utility must purchase the power produced by a project meeting certain definitional requirements; and second, the utility must pay a price for the power, determined in accordance with guidelines set out in the FERC regulations.more » This handbook is designed to explain to developers in North Carolina the requirements of PURPA, including: who may qualify for treatment as a facility that may invoke the mandates of PURPA; the impact of PURPA on the state; the role of the state utility commission and the impact of state laws on the developer. Thus, the primary goal of the handbook is to provide potential small producers with a working understanding of their status and rights vis a vis the state utility commissions and electric utilities, and to aid the potential developer in obtaining the information needed to stimulate further research and development.« less
Developer handbook for Section 210 of PURPA for Maine
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Connell, J.
The essential element of the Public Utility Regulatory Policies Act of 1978 (PURPA) for developers is a reordering by Congress of the relationship between electric utilities and small power producers. The goal of PURPA is to encourage development of alternative sources of electricity by helping small power production become economically viable. The strategy adopted by Congress for encouraging development has two main components. First, the utility must purchase the power produced by a project meeting certain definitional requirements; and second, the utility must pay a price for the power, determined in accordance with guidelines set out in the FERC regulations.more » This handbook is designed to explain to developers in Maine the requirements of PURPA, including: who may qualify for treatment as a facility that may invoke the mandates of PURPA; the impact of PURPA on the state; the role of the state utility commission and the impact of state laws on the developer. Thus, the primary goal of the handbook is to provide potential small producers with a working understanding of their status and rights vis a vis the state utility commissions and electric utilities, and to aid the potential developer in obtaining the information needed to stimulate further research and development.« less
Developer handbook for Section 210 of PURPA for Arkansas
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The essential element of the Public Utility Regulatory Policies Act of 1978 (PURPA) for developers is a reordering by Congress of the relationship between electric utilities and small power producers. The goal of PURPA is to encourage development of alternative sources of electricity by helping small power production become economically viable. The strategy adopted by Congress for encouraging development has two main components. First, the utility must purchase the power produced by a project meeting certain definitional requirements; and second, the utility must pay a price for the power, determined in accordance with guidelines set out in the FERC regulations.more » This handbook is designed to explain to developers in Arkansas the requirements of PURPA, including: who may qualify for treatment as a facility that may invoke the mandates of PURPA; the impact of PURPA on the state; the role of the state utility commission and the impact of state laws on the developer. Thus, the primary goal of the handbook is to provide potential small producers with a working understanding of their status and rights vis a vis the state utility commissions and electric utilities, and to aid the potential developer in obtaining the information needed to stimulate further research and development.« less
Developer handbook for Section 210 of PURPA for Colorado
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The essential element of the Public Utility Regulatory Policies Act of 1978 (PURPA) for developers is a reordering by Congress of the relationship between electric utilities and small power producers. The goal of PURPA is to encourage development of alternative sources of electricity by helping small power production become economically viable. The strategy adopted by Congress for encouraging development has two main components. First, the utility must purchase the power produced by a project meeting certain definitional requirements; and second, the utility must pay a price for the power, determined in accordance with guidelines set out in the FERC regulations.more » This handbook is designed to explain to developers in Colorado the requirements of PURPA, including: who may qualify for treatment as a facility that may invoke the mandates of PURPA; the impact of PURPA on the state; the role of the state utility commission and the impact of state laws on the developer. Thus, the primary goal of the handbook is to provide potential small producers with a working understanding of their status and rights vis a vis the state utility commissions and electric utilities, and to aid the potential developer in obtaining the information needed to stimulate further research and development.« less
Developer handbook for Section 210 of PURPA for Pennsylvania
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The essential element of the Public Utility Regulatory Policies Act of 1978 (PURPA) for developers is a reordering by Congress of the relationship between electric utilities and small power producers. The goal of PURPA is to encourage development of alternative sources of electricity by helping small power production become economically viable. The strategy adopted by Congress for encouraging development has two main components. First, the utility must purchase the power produced by a project meeting certain definitional requirements; and second, the utility must pay a price for the power, determined in accordance with guidelines set out in the FERC regulations.more » This handbook is designed to explain to developers in Pennsylvania the requirements of PURPA, including: who may qualify for treatment as a facility that may invoke the mandates of PURPA; the impact of PURPA on the state; the role of the state utility commission and the impact of state laws on the developer. Thus, the primary goal of the handbook is to provide potential small producers with a working understanding of their status and rights vis a vis the state utility commissions and electric utilities, and to aid the potential developer in obtaining the information needed to stimulate further research and development.« less
Developer handbook for Section 210 of PURPA for Connecticut
DOE Office of Scientific and Technical Information (OSTI.GOV)
O'Connell, J.
The essential element of the Public Utility Regulatory Policies Act of 1978 (PURPA) for developers is a reordering by Congress of the relationship between electric utilities and small power producers. The goal of PURPA is to encourage development of alternative sources of electricity by helping small power production become economically viable. The strategy adopted by Congress for encouraging development has two main components. First, the utility must purchase the power produced by a project meeting certain definitional requirements; and second, the utility must pay a price for the power, determined in accordance with guidelines set out in the FERC regulations.more » This handbook is designed to explain to developers in Connecticut the requirements of PURPA, including: who may qualify for treatment as a facility that may invoke the mandates of PURPA; the impact of PURPA on the state; the role of the state utility commission and the impact of state laws on the developer. Thus, the primary goal of the handbook is to provide potential small producers with a working understanding of their status and rights vis a vis the state utility commissions and electric utilities, and to aid the potential developer in obatining the information needed to stimulate further research and development.« less
Developer handbook for Section 210 of PURPA for Rhode Island
DOE Office of Scientific and Technical Information (OSTI.GOV)
Meyer, D.; Vanacore, J.
The essential element of the Public Utility Regulatory Policies Act of 1978 (PURPA) for developers is a reordering by Congress of the relationship between electric utilities and small power producers. The goal of PURPA is to encourage development of alternative sources of electricity by helping small power production become economically viable. The strategy adopted by Congress for encouraging development has two main components. First, the utility must purchase the power produced by a project meeting certain definitional requirements; and second, the utility must pay a price for the power, determined in accordance with guidelines set out in the FERC regulations.more » This handbook is designed to explain to developers in Rhode Island the requirements of PURPA, including: who may qualify for treatment as a facility that may invoke the mandates of PURPA; the impact of PURPA on the state; the role of the state utility commission and the impact of state laws on the developer. Thus, the primary goal of the handbook is to provide potential small producers with a working understanding of their status and rights vis a vis the state utility commissions and electric utilities, and to aid the potential developer in obtaining the information needed to stimulate further research and development.« less
10 CFR 50.51 - Continuation of license.
Code of Federal Regulations, 2010 CFR
2010-01-01
... NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... license will be issued for a fixed period of time to be specified in the license but in no case to exceed... expiration date to authorize ownership and possession of the production or utilization facility, until the...
10 CFR 50.51 - Continuation of license.
Code of Federal Regulations, 2011 CFR
2011-01-01
... NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... license will be issued for a fixed period of time to be specified in the license but in no case to exceed... expiration date to authorize ownership and possession of the production or utilization facility, until the...
18 CFR 366.22 - Accounts and records of service companies.
Code of Federal Regulations, 2013 CFR
2013-04-01
... service companies. 366.22 Section 366.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005... utility customers with respect to jurisdictional rates. (2) Transition period. Until December 31, 2007...
18 CFR 366.22 - Accounts and records of service companies.
Code of Federal Regulations, 2014 CFR
2014-04-01
... service companies. 366.22 Section 366.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005... utility customers with respect to jurisdictional rates. (2) Transition period. Until December 31, 2007...
18 CFR 366.22 - Accounts and records of service companies.
Code of Federal Regulations, 2012 CFR
2012-04-01
... service companies. 366.22 Section 366.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005... utility customers with respect to jurisdictional rates. (2) Transition period. Until December 31, 2007...
18 CFR 366.22 - Accounts and records of service companies.
Code of Federal Regulations, 2011 CFR
2011-04-01
... service companies. 366.22 Section 366.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005... utility customers with respect to jurisdictional rates. (2) Transition period. Until December 31, 2007...
ERIC Educational Resources Information Center
Jordan, Myron K.
Did President Franklin D. Roosevelt's condemnation of electric utility public relations represent a fair interpretation of the findings of the Federal Trade Commission (FTC) investigation into the electric utility industry as authorized by Senate Resolution 83 in February, 1928, or were Roosevelt's statements simply campaign hyperbole that met the…
DOE Office of Scientific and Technical Information (OSTI.GOV)
NONE
1995-12-31
In June 1995, the New York Public Service Commission (NYPSC) released a Staff investigation of Orange and Rockland Utilities, Inc. (O&R). The primary focus of the Staffs investigation was the Corporate Policy and External Affairs Department, a restricted disbursements account, the Internal Auditing Department, and O&R officer malfeasance. The Staffs` investigation uncovered widespread, alleged instances of lax internal controls, unethical and illegal actions, and lavish officer behavior. In addition, the Staff investigated O&R`s internal control and purchasing functions. The Staff proposed a series of recommendations to improve the Company`s internal control, purchasing, ethical, climate and addressed the issue of amore » New York ratepayer reimbursement. The Staffs findings and recommendations were presented in the form of a report, entitled Staff Investigation of Orange and Rockland Utilities, Inc. This article summarizes the Report.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2013-05-06
...-kilowatt (kW) power recovery turbine; (4) a 25-foot-long, 8-foot- wide, 3-foot-deep cobble-lined tailrace... 150-foot-long, 8- foot-wide, 3-foot-deep cobble-lined tailrace discharging flows into Port Althorp... electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site...
an individual, locality, public institution of higher education, or the Virginia Department of Conservation and Recreation, who is not a public utility, public service corporation, or public service company public utility. The Virginia State Corporation Commission may not set the rates, charges, or fees for
18 CFR 367.1430 - Account 143, Other accounts receivable.
Code of Federal Regulations, 2010 CFR
2010-04-01
... REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL...
18 CFR 367.1860 - Account 186, Miscellaneous deferred debits.
Code of Federal Regulations, 2010 CFR
2010-04-01
... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY... COMPANIES SUBJECT TO THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT Balance Sheet Chart of Accounts Deferred Debits § 367.1860 Account 186, Miscellaneous...
77 FR 16214 - Commission Information Collection Activities (FERC-598); Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-20
... Generator or Foreign Utility Company Status, to the Office of Management and Budget (OMB) for review of the...., Washington, DC 20426. Instructions: All submissions must be formatted and filed in accordance with submission...: Title: FERC-598, Self Certification for Entities Seeking Exempt Wholesale Generator or Foreign Utility...
18 CFR 367.3960 - Account 396, Power operated equipment.
Code of Federal Regulations, 2010 CFR
2010-04-01
... REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL...
18 CFR 367.1240 - Account 124, Other investments.
Code of Federal Regulations, 2010 CFR
2010-04-01
... COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-22
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Commissioner and Staff Attendance at the National Association of Regulatory Utility Commissioners 2013 Summer Committee Meetings The... Downtown Hotel, 1550 Court Place, Denver, CO 80202. Further information may be found at http://summer...
New Hampshire | Midmarket Solar Policies in the United States | Solar
implemented. New Hampshire Public Utilities Commission's (NHPUC) administers a rebate program for commercial Administrator Incentive Commercial & Industrial Solar Incentive Program New Hampshire Public Utilities $0.25/W rebate for residential systems $0.25/W rebate for commercial/government systems Capped at $1,375
18 CFR 367.54 - Expenditures on leased property.
Code of Federal Regulations, 2010 CFR
2010-04-01
... COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS...
18 CFR 367.2190 - Account 219, Accumulated other comprehensive income.
Code of Federal Regulations, 2010 CFR
2010-04-01
... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT UNIFORM SYSTEM OF ACCOUNTS FOR CENTRALIZED SERVICE COMPANIES SUBJECT TO THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL...
STATE ACID RAIN RESEARCH AND SCREENING SYSTEM - VERSION 1.0 USER'S MANUAL
The report is a user's manual that describes Version 1.0 of EPA's STate Acid Rain Research and Screening System (STARRSS), developed to assist utility regulatory commissions in reviewing utility acid rain compliance plans. It is a screening tool that is based on scenario analysis...
10 CFR 50.22 - Class 103 licenses; for commercial and industrial facilities.
Code of Federal Regulations, 2010 CFR
2010-01-01
... facilities. 50.22 Section 50.22 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND..., transfer, acquire, possess, or use a production or utilization facility for industrial or commercial purposes; Provided, however, That in the case of a production or utilization facility which is useful in...
47 CFR 87.351 - Frequency changes.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Frequency changes. 87.351 Section 87.351... Aeronautical Utility Mobile Stations § 87.351 Frequency changes. When the aeronautical utility frequency is required to be changed because of an action by the FAA or the Commission (such as a change in the ground...
18 CFR 294.101 - Shortages of electric energy and capacity.
Code of Federal Regulations, 2011 CFR
2011-04-01
... energy and capacity. 294.101 Section 294.101 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 PROCEDURES FOR SHORTAGES OF ELECTRIC ENERGY AND CAPACITY UNDER SECTION 206 OF THE PUBLIC UTILITY...
18 CFR 294.101 - Shortages of electric energy and capacity.
Code of Federal Regulations, 2013 CFR
2013-04-01
... energy and capacity. 294.101 Section 294.101 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 PROCEDURES FOR SHORTAGES OF ELECTRIC ENERGY AND CAPACITY UNDER SECTION 206 OF THE PUBLIC UTILITY...
18 CFR Appendix 1 to Part 301 - ASC Utility Filing Template
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false ASC Utility Filing Template 1 Appendix 1 to Part 301 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS FOR FEDERAL POWER MARKETING ADMINISTRATIONS AVERAGE SYSTEM COST...
18 CFR Appendix 1 to Part 301 - ASC Utility Filing Template
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false ASC Utility Filing Template 1 Appendix 1 to Part 301 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS FOR FEDERAL POWER MARKETING ADMINISTRATIONS AVERAGE SYSTEM COST...
18 CFR 2.78 - Utilization and conservation of natural resources-natural gas.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Utilization and conservation of natural resources-natural gas. 2.78 Section 2.78 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND...
18 CFR Appendix 1 to Part 301 - ASC Utility Filing Template
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false ASC Utility Filing Template 1 Appendix 1 to Part 301 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS FOR FEDERAL POWER MARKETING ADMINISTRATIONS AVERAGE SYSTEM COST...
18 CFR Appendix 1 to Part 301 - ASC Utility Filing Template
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false ASC Utility Filing Template 1 Appendix 1 to Part 301 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS FOR FEDERAL POWER MARKETING ADMINISTRATIONS AVERAGE SYSTEM COST...
18 CFR 2.78 - Utilization and conservation of natural resources-natural gas.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Utilization and conservation of natural resources-natural gas. 2.78 Section 2.78 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND...
18 CFR 2.78 - Utilization and conservation of natural resources-natural gas.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Utilization and conservation of natural resources-natural gas. 2.78 Section 2.78 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND...
18 CFR 2.78 - Utilization and conservation of natural resources-natural gas.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Utilization and conservation of natural resources-natural gas. 2.78 Section 2.78 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES GENERAL POLICY AND...
18 CFR Appendix 1 to Part 301 - ASC Utility Filing Template
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false ASC Utility Filing Template 1 Appendix 1 to Part 301 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS FOR FEDERAL POWER MARKETING ADMINISTRATIONS AVERAGE SYSTEM COST...
Energy Demand-Side Management: New Perspectives for a New Era
ERIC Educational Resources Information Center
Carley, Sanya
2012-01-01
Over the past decade and a half, state governments have assumed greater responsibility over demand-side management (DSM) operations. Whereas DSM programs formerly were initiated primarily by utilities or state public utility commissions, they are now becoming increasingly state-initiated and incentivized through funding mechanisms or…
18 CFR 367.9240 - Account 924, Property insurance.
Code of Federal Regulations, 2013 CFR
2013-04-01
... COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL... THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS...) This account must include the cost of insurance or reserve accruals to protect the service company...
18 CFR 367.9240 - Account 924, Property insurance.
Code of Federal Regulations, 2014 CFR
2014-04-01
... COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL... THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS...) This account must include the cost of insurance or reserve accruals to protect the service company...
18 CFR 367.9240 - Account 924, Property insurance.
Code of Federal Regulations, 2011 CFR
2011-04-01
... COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL... THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS...) This account must include the cost of insurance or reserve accruals to protect the service company...
18 CFR 367.9240 - Account 924, Property insurance.
Code of Federal Regulations, 2012 CFR
2012-04-01
... COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL... THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS...) This account must include the cost of insurance or reserve accruals to protect the service company...
An overview and the current status of instrumentation at the Large Binocular Telescope Observatory
NASA Astrophysics Data System (ADS)
Wagner, R. Mark; Edwards, Michelle L.; Kuhn, Olga; Thompson, David; Veillet, Christian
2014-07-01
An overview of instrumentation for the Large Binocular Telescope (LBT) is presented. Optical instrumentation includes the Large Binocular Camera (LBC), a pair of wide-field (24' × 24') mosaic CCD imagers at the prime focus, and the Multi-Object Double Spectrograph (MODS), a pair of dual-beam blue-red optimized long-slit spectrographs mounted at the left and right direct F/15 Gregorian foci incorporating multiple slit masks for multi-object spectroscopy over a 6' field and spectral resolutions of up to 2000. Infrared instrumentation includes the LBT Near-IR Spectrometer (LUCI), a modular near-infrared (0.9-2.5 μm) imager and spectrograph pair mounted at the left and right front-bent F/15 Gregorian foci and designed for seeing-limited (FOV: 4' × 4') imaging, long-slit spectroscopy, and multi-object spectroscopy utilizing cooled slit masks and diffraction limited (FOV: 0'.5 x 0'.5) imaging and long-slit spectroscopy. Strategic instruments under development that can utilize the full 23 m baseline of the LBT include an interferometric cryogenic beam combiner with near-infrared and thermal-infrared instruments for Fizeau imaging and nulling interferometry (LBTI) and an optical bench near- infrared beam combiner utilizing multi-conjugate adaptive optics for high angular resolution and sensitivity (LINC-NIRVANA). LBTI is currently undergoing commissioning and performing science observations on the LBT utilizing the installed adaptive secondary mirrors in both single-sided and two-sided beam combination modes. In addition, a fiber-fed bench spectrograph (PEPSI) capable of ultra high resolution spectroscopy and spectropolarimetry (R = 40,000-300,000) will be available as a principal investigator instrument. Installation and testing of the bench spectrograph will begin in July 2014. Over the past four years the LBC pair, LUCI1, and MODS1 have been commissioned and are now scheduled for routine partner science observations. Both LUCI2 and MODS2 passed their laboratory acceptance milestones in the summer of 2013 and have been installed on the LBT. LUCI2 is currently being commissioned and the data analysis is well underway. Diffraction-limited commissioning of its adaptive optics modes will begin in the 2014B semester. MODS2 commissioning began in May 2014 and will completed in the 2014B semester as well. Binocular testing and commissioning of both the LUCI and MODS pairs will begin in 2014B with the goal that this capability could be offered sometime in 2015. The availability of all these instruments mounted simultaneously on the LBT permits unique science, flexible scheduling, and improved operational support.
An Evaluation of Economists’ Influence on Electric Utility Rate Reforms,
1982-01-01
PURPA ) of 1978 required all 50 state utility commissions and more than 150 other jurisdictions regulating electric utility rates to con- sider the...complex rate structure). The "cost effectiveness" language of PURPA suggests such an evaluation criterion based on long term considerations without...detailing the components of benefit; see Joskow. Individual hearings under PURPA have generally employed three standards: fuel or energy savings (if a TOU
DOE Office of Scientific and Technical Information (OSTI.GOV)
Spudeck, R.E.
1983-01-01
Two weeks prior to the Three Mile Island accident, March 15, 1979, the Nuclear Regulatory Commission ordered five operating nuclear plants shut down in order to reexamine safety standards in these plants. Reports in the popular and trade press during this time suggested that these events, particularly the accident at Three Mile Island, caused investors in the securities of electric utilities that had nuclear-generation facilities to revise their risk perceptions. This study was designed to examine the impact of both the Nuclear Regulatory Commission order and the accident at Three Mile Island on investor risk perceptions. Selected categories of electricmore » utilities were chosen to examine any differential risk effects resulting from these events. An asset pricing model devoid of many of the restrictive assumptions of more familiar models was used to model investor behavior. The findings suggest that the events described did cause investors to revise upward their perceptions of systematic risk regarding different categories of electric utilities. More specifically, those electric utilities that were operating nuclear plants in 1979 experienced the largest and most sustained increase in systematic risk. However, electric utilities that in 1979 had no operating nuclear plants, but had planned and committed funds for nuclear plants in the future, also experienced increases in systematic risk.« less
NASA Astrophysics Data System (ADS)
Ashley, Deborah J. Cordaro
2000-11-01
Public organizations are formed in response to societal needs. They collect taxes, educate children, enforce laws and provide protection to the environment, the nation and consumers. One such organization is the New York State Public Service Commission. In 1907, legislation was passed to form the New York State Public Service Commission the first regulatory body of its kind in the United States. Its mission was to provide safe, reliable and reasonably priced electricity. Subsequently, this became the model that was implemented in every state in the nation. The past decade heralds an era of competition and a lessening of regulatory control. The telephone, natural gas and airline industries are in various stages of deregulation, and the electric industry is beginning down this path as well. In an environment such as this, are regulatory organizations necessary, and if they are, how can they organize to meet the new societal requirements? The case of the New York State Public Service Commission at this point in time offers a real time study of a regulatory body immersed in an environment that is calling for competition and an end to big government. Utilizing case studies of industries that have deregulated, or are in the process of deregulating, indicates a future societal need for regulations. This result does not lead to a conclusion that organizational change is unnecessary. This Dissertation will lay out the current organizational structure of the Public Service Commission, give an overview of the environmental signals, describe the mission/core values, and illustrate general political and employee factors that are indigenous to public service. Utilizing both classic and current organizational theory, an evaluation will be made of the Commission's need for change, their ability to change, and obstacles they may encounter.
A Marriage Proposal: Cable Television and Local Public Power.
ERIC Educational Resources Information Center
Schwartz, Louis; Woods, Robert A.
Two articles reprinted from "Public Power" discuss the present state of cable television (TV), its future prospects, and the opportunities offered municipal utilities by cable TV. The proposal is that local publicly-owned electric utilities meet the requirements of the Federal Communications Commission (FCC) for cable TV ownership and have the…
18 CFR 367.1520 - Account 152, Fuel stock expenses undistributed.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 152, Fuel stock... REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005... TO THE PROVISIONS OF THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL...
Code of Federal Regulations, 2011 CFR
2011-01-01
... utilization projects; the Puerto Rico Hurricane Relief Commission and successor agencies in connection with Puerto Rico Hurricane relief loans to individuals; State Rural Rehabilitation Corporations, the United...
Code of Federal Regulations, 2013 CFR
2013-01-01
... utilization projects; the Puerto Rico Hurricane Relief Commission and successor agencies in connection with Puerto Rico Hurricane relief loans to individuals; State Rural Rehabilitation Corporations, the United...
Code of Federal Regulations, 2014 CFR
2014-01-01
... utilization projects; the Puerto Rico Hurricane Relief Commission and successor agencies in connection with Puerto Rico Hurricane relief loans to individuals; State Rural Rehabilitation Corporations, the United...
Code of Federal Regulations, 2012 CFR
2012-01-01
... utilization projects; the Puerto Rico Hurricane Relief Commission and successor agencies in connection with Puerto Rico Hurricane relief loans to individuals; State Rural Rehabilitation Corporations, the United...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-06-26
.... Date filed: June 10, 2013. d. Applicant: Gresham Municipal Utilities. e. Name of Project: Upper Red Lake Dam Hydroelectric Project. f. Location: On Red River in Shawano County, Wisconsin. No federal... analysis at this time. n. The Upper Red Lake Dam Hydroelectric Project would consist of the following...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-14
... Bickford, Natural Resources Supervisor, Public Utility District No. 1 of Douglas County, 1151 Valley Mall...-mail at [email protected] . j. Deadline for filing comments on the Settlement: July 27, 2010. Reply... toll-free at (866) 208-3676; or, for TTY, contact (202) 502-8659. Although the Commission strongly...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-05-11
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2157-188] Public Utility District No. 1 of Snohomish County, WA; Notice of Availability of Draft Environmental Assessment May 4... Hydroelectric Project (FERC Project No. 2157-188), located on the Sultan River 20 miles east of the city of...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-12
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 2157-188] Public Utility District No. 1 of Snohomish County, WA; Notice of Availability of Final Environmental Assessment November 4... Hydroelectric Project (FERC Project No. 2157-188), located on the Sultan River 20 miles east of the city of...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 292.602 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 REGULATIONS UNDER SECTIONS... capacity over 30 megawatts if such facility produces electric energy solely by the use of biomass as a...
Code of Federal Regulations, 2011 CFR
2011-04-01
....602 Section 292.602 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 REGULATIONS UNDER... produces electric energy solely by the use of biomass as a primary energy source. (b) Exemption from the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-01-28
... decision- making over sales of electric energy. 16. American Public Power Association (APPA) and National... securities of a public utility. Specifically, the Commission proposes to amend Part 33 of its regulations to... than 20 percent, of the outstanding voting securities of a public utility or holding company, where the...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-06-30
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No.: ER02-2001-000] Revised Public Utility Filing; Requirements for Electric Quarterly Reports; Notice of Electric Quarterly Reports Users Group Meeting This notice announces a meeting of the Electric Quarterly Reports (EQR) Users Group to be held Wednesday, July 13, 2011, in the...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Calculation of taxes for property of public utilities and licensees constructed or acquired after January 1, 1970. 2.12 Section 2.12 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Good faith requests for transmission services and good faith responses by transmitting utilities. 2.20 Section 2.20 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Calculation of taxes for property of public utilities and licensees constructed or acquired after January 1, 1970. 2.12 Section 2.12 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Calculation of taxes for property of public utilities and licensees constructed or acquired after January 1, 1970. 2.12 Section 2.12 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF...
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Good faith requests for transmission services and good faith responses by transmitting utilities. 2.20 Section 2.20 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES...
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Calculation of taxes for property of public utilities and licensees constructed or acquired after January 1, 1970. 2.12 Section 2.12 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF...
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Good faith requests for transmission services and good faith responses by transmitting utilities. 2.20 Section 2.20 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY GENERAL RULES...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-26
... respondents; 50 responses. Estimated Time per Response: 0.6 hours (36 minutes). Frequency of Response: On... shall have practical utility; (b) the accuracy of the Commission's burden estimate; (c) ways to enhance the quality, utility, and clarity of the information collected; (d) ways to minimize the burden of the...
Gender Differences in Life-Work Balance and Their Impact on Female Occupational Choice and Retention
2015-03-01
differences between age groups, sexes , commissioning source, and designator. a. Approach The source utilized to conduct the survey was LimeSurvey...different groups consisting of designators, sex , age, commissioning source, and lateral transfers. This allowed the researchers to identify any...being able to really flex around whatever you need to do whenever. Not having to—once again, if you don’t have class, being able to take your kids
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-18
... utilizations are approaching their limits. In the future, we will provide firms with access to a separate view... 19b-4(f)(1) \\4\\ thereunder, so that the proposal was effective upon filing with the Commission. The... house origins. The utilization of this limit will be based on the same margin methodology that CME...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-09
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Docket No. EL13-81-000] PSEG Long Island LLC, Long Island Electric Utility Servco LLC, Long Island Power Authority, Long Island Lighting Company; Notice of Petition for Declaratory Order Take notice that on August 1, 2013, pursuant to Rule 207 of the Federal Energy Regulatory...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-05
... project can be viewed or printed on the eLibrary link of the Commission's Web site at http://www.ferc.gov... Wisconsin System Inc., Kaukauna Utilities; Notice of Application for Transfer of License and Soliciting Comments and Motions To Intervene January 29, 2010. On January 25, 2010, NewPage Wisconsin System Inc...
18 CFR 141.1 - FERC Form No. 1, Annual report of Major electric utilities, licensees and others.
Code of Federal Regulations, 2010 CFR
2010-04-01
... district, or other political subdivision or agency of a State competent under the laws thereof to carry on the business of developing, transmitting, utilizing, or distributing power). (2) When to file and what... filed with the Federal Energy Regulatory Commission as prescribed in § 385.2011 of this chapter and as...
Report on Utilities Usage and Cost, 1980-81 to 1984-85.
ERIC Educational Resources Information Center
Alabama State Commission on Higher Education, Montgomery.
The consumption and cost of energy and other types of utilities by state college campuses were analyzed by the Alabama Commission on Higher Education. A focus of attention has been changes in energy usage per square foot from year to year as an indicator of the institutions' energy conservation and, over time, of the changing characteristics of…
Land mobile spectrum utilization: San Francisco, California and Chicago, Illinois
NASA Astrophysics Data System (ADS)
Reed, L. D.
1980-08-01
Radio frequency utilization by Federal Communication Commission licenses in the San Francisco and Chicago urbanized areas is described. The license include among others: police and fire departments; hospitals; public utilities; marine; and common carrier users. The extent of frequency utilization is described in terms of four occupancy categorizations (zero, low, substantial and very high). The rationale for these categories and their relationship to measured usage data is given. Summary tables enable direct comparison of the use by various individual, radio services, e.g., police, business, taxicab, etc. Separate analyses are given for utilization by each of the land mobile radio services and for each frequency band.
Operational Experience with the MICE Spectrometer Solenoid System
DOE Office of Scientific and Technical Information (OSTI.GOV)
Feher, Sandor; Bross, Alan; Hanlet, Pierrick
The Muon Ionization Cooling Experiment located at Rutherford Appleton Laboratory in England utilizes a supercon-ducting solenoid system for the muon cooling channel that also holds particle tracking detectors and muon absorbers inside their bores. The solenoid system installation was completed in summer of 2015 and after commissioning the system it has been running successfully. As a result, this paper summarizes the commissioning results and operational experience with the magnets focusing on the per-formance of the two Spectrometer Solenoids built by the US.
Operational Experience with the MICE Spectrometer Solenoid System
Feher, Sandor; Bross, Alan; Hanlet, Pierrick
2018-01-11
The Muon Ionization Cooling Experiment located at Rutherford Appleton Laboratory in England utilizes a supercon-ducting solenoid system for the muon cooling channel that also holds particle tracking detectors and muon absorbers inside their bores. The solenoid system installation was completed in summer of 2015 and after commissioning the system it has been running successfully. As a result, this paper summarizes the commissioning results and operational experience with the magnets focusing on the per-formance of the two Spectrometer Solenoids built by the US.
U.S. Highway 280 alternatives analysis and visualization
DOT National Transportation Integrated Search
2005-06-01
The Regional Planning Commission of Greater Birmingham (RPCGB), with coordination from Progress 280 and : the Alabama Department of Transportation (ALDOT), initiated the current study to utilize microscopic traffic : simulation to examine the effects...
77 FR 60420 - Notice of Petition for Enforcement
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-03
...)(2) of the Public Utility Regulatory Policies Act of 1978 (PURPA),\\1\\ Murphy Flat Energy LLC, Murphy... Federal Energy Regulatory Commission take enforcement action under section 210(h) of PURPA against the...
11 CFR 9036.4 - Commission review of submissions.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., in conducting its review, may utilize statistical sampling techniques. Based on the results of its... nonmatchable and the reason that it is not matchable; or if statistical sampling is used, the estimated amount...
77 FR 69614 - Commission Information Collection Activities (FERC-714); Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-20
... to correlate rates and charges, assess reliability and other operating attributes in regulatory..., including the validity of the methodology and assumptions used; (3) ways to enhance the quality, utility and...
Electric Utility Rate Design Study: reference manual and procedures for implementing PURPA
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
State regulatory commissions will be assisted by using this manual in carrying out their responsibilities under the National Energy Act, specifically under the Public Utilities Regulatory Policies Act (PURPA). The research and materials of the Rate Design Study are basically applicable to Title I of PURPA, and the Manual covers only that part of the Act. The Rate Design Study covers a wide scope of research and professional opinions and are a major reference source for data, information, and divergent views on practically every aspect of electric utility rate design. The introductory part calls attention to particularly important aspects ofmore » responsibilities, authority, and procedures. The second part outlines the specific responsibilities placed by Title I of PURPA on the State commissions. Part 3 discusses some of the procedural and substantive requirements and options of PURPA with particular emphasis on their relation to the Rate Design Study, State law, and State regulatory policies. Part 4 is an independent analysis that includes cross-indexed references to the more than 60 reports prepared by the Rate Design Study and also to other pertinent sources of information and data. Part 5 summarizes a survey conducted in January 1979 of State commission actions related to the matters contained in Title I of PURPA. Part 6 presents the text of the law. Part 7 is the request from NARUC that prompted the preparation of the Manual. (MCW)« less
Oregon | Midmarket Solar Policies in the United States | Solar Research |
Utilities Commission. System size limit: PGE and PacifiCorp customers: 2 MW for non-residential, 25 kW for residential; municipal, electric cooperative, and public utility district customers: 25 kW for non-residential , >25 kW and â¤2MW, non-exporting systems â¤10 MW, and all systems. System size limit: 10 MW
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-30
...As part of its continuing effort to reduce paperwork burden and as required by the Paperwork Reduction Act (PRA) of 1995 (44 U.S.C. 3501-3520), the Federal Communications Commission (FCC) invites the general public and other Federal agencies to take this opportunity to comment on the following information collection(s). Comments are requested concerning: whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information shall have practical utility; the accuracy of the Commission's burden estimate; ways to enhance the quality, utility, and clarity of the information collected; ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology; and further ways to reduce the information burden for small business concerns with fewer than 25 employees. The FCC may not conduct or sponsor a collection of information unless it displays a currently valid OMB Control Number. No person shall be subject to any penalty for failing to comply with a collection of information subject to the Paperwork Reduction Act (PRA) that does not display a valid Control Number.
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-30
...As part of its continuing effort to reduce paperwork burden and as required by the Paperwork Reduction Act (PRA) of 1995 (44 U.S.C. 3501-3520), the Federal Communications Commission (FCC) invites the general public and other Federal agencies to take this opportunity to comment on the following information collection(s). Comments are requested concerning: whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information shall have practical utility; the accuracy of the Commission's burden estimate; ways to enhance the quality, utility, and clarity of the information collected; ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology; and further ways to reduce the information burden for small business concerns with fewer than 25 employees. The FCC may not conduct or sponsor a collection of information unless it displays a currently valid OMB Control Number. No person shall be subject to any penalty for failing to comply with a collection of information subject to the Paperwork Reduction Act (PRA) that does not display a valid Control Number.
Sacramento Municipal Utility District PV and Smart Grid Pilot at Anatolia
DOE Office of Scientific and Technical Information (OSTI.GOV)
Rawson, Mark; Sanchez, Eddie Paul
2013-12-30
Under DE-FOA-0000085 High Penetration Solar Deployment, the U. S. Department of Energy funded agreements with SMUD and Navigant Consulting, SunPower, GridPoint, the National Renewable Energy Laboratory, and the California Energy Commission for this pilot demonstration project. Funding was $5,962,409.00. Cost share of $500,000 was also provided by the California Energy Commission. The project has strategic implications for SMUD, other utilities and the PV and energy-storage industries in business and resource planning, technology deployment and asset management. These implications include: -At this point, no dominant business models have emerged and the industry is open for new ideas. -Demonstrated two business modelsmore » for using distributed PV and energy storage, and brainstormed several dozen more, each with different pros and cons for SMUD, its customers and the industry. -Energy storage can be used to manage high penetrations of PV and mitigate potential issues such as reverse power flow, voltage control violations, power quality issues, increased wear and tear on utility equipment, and system wide power supply issues. - Smart meters are another tool utilities can use to manage high penetrations of PV. The necessary equipment and protocols exist, and the next step is to determine how to integrate the functionality with utility programs and what level of utility control is required. - Time-of-use rates for the residential customers who hosted energy storage systems did not cause a significant change in energy usage patterns. However, the rates we used were not optimized for PV and energy storage. Opportunities exist for utilities to develop new structures.« less
Assessment of institutional barriers to the use of natural gas fuel in automotive vehicle fleets
NASA Technical Reports Server (NTRS)
Jablonski, J.; Lent, L.; Lawrence, M.; White, L.
1983-01-01
Institutional barriers to the use of natural gas as a fuel for motor vehicle fleets were identified. Recommendations for barrier removal were developed. Eight types of institutional barriers were assessed: (1) lack of a national standard for the safe design and certification of natural gas vehicles and refueling stations; (2) excessively conservative or misapplied state and local regulations, including bridge and tunnel restrictions, restrictions on types of vehicles that may be fueled by natural gas, zoning regulations that prohibit operation of refueling stations, parking restrictions, application of LPG standards to LNG vehicles, and unintentionally unsafe vehicle or refueling station requirements; (3) need for clarification of EPA's tampering enforcement policy; (4) the U.S. hydrocarbon standard; (5) uncertainty concerning state utility commission jurisdiction; (6) sale for resale prohibitions imposed by natural gas utility companies or state utility commissions; (7) uncertainty of the effects of conversions to natural gas on vehicle manufactures warranties; and (8) need for a natural gas to gasoline equivalent units conversion factor for use in calculation of state road use taxes.
10 CFR Appendix L to Part 50 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] L Appendix L to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendix L to Part 50 [Reserved] ...
Strategic plan for IVHS/CVO Oregon
DOT National Transportation Integrated Search
1993-07-01
Since the mid-1980's the Department of : Transportation and the Public Utility : Commission have been developing and : testing a variety of technologies to : improve the operation and regulation of : commercial vehicles traveling in Oregon. : These t...
NPDES Permit for Lame Deer Lagoon Wastewater Treatment Facility in Montana
Final permit authorizes the Northern Cheyenne Utilities Commission to discharge from its Lame Deer Lagoon wastewater treatment facility located in Rosebud County, Montana to Lame Deer Creek, a tributary to Rosebud Creek.
10 CFR Appendix P to Part 50 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] P Appendix P to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendix P to Part 50 [Reserved] ...
10 CFR Appendix D to Part 50 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] D Appendix D to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendix D to Part 50 [Reserved] ...
10 CFR Appendix M to Part 50 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] M Appendix M to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendix M to Part 50 [Reserved] ...
10 CFR Appendix O to Part 50 - [Reserved
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false [Reserved] O Appendix O to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendix O to Part 50 [Reserved] ...
ERIC Educational Resources Information Center
Muchinsky, Paul M.
1975-01-01
A work sample test can provide a high degree of content validity, and offers a practical method of screening job applicants in accordance with guidelines on employee selection procedures set forth by the Equal Employment Opportunity Commission. (MW)
Survey of electric utility demand for coal. [1972-1992; by utility and state
DOE Office of Scientific and Technical Information (OSTI.GOV)
Asbury, J.G.; Caruso, J.V.; Kouvalis, A.
1979-08-01
This report presents the results of a survey of electric utility demand for coal in the United States. The sources of survey information are: (1) Federal Energy Regulatory Commission Form 423 data on utility coal purchases during the period July 1972 through December 1978 and (2) direct telephone survey data on utility coal-purchase intentions for power plants to be constructed by 1992. Price and quantity data for coal used in existing plants are presented to illustrate price and market-share trends in individual coal-consuming states during recent years. Coal source, quality, quantity, and transportation data are reported for existing and plannedmore » generating plants.« less
Federal Register 2010, 2011, 2012, 2013, 2014
2010-09-09
... (Interstate Common line Support (ICLS)) to replace implicit support in interstate access charges with explicit... performance of the functions of the Commission, including whether the information shall have practical utility...
10 CFR Appendixes L-M to Part 50 - [Reserved
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false [Reserved] L Appendixes L-M to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendixes L-M to Part 50 [Reserved] ...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-28
..., violates the Public Utility Regulatory Policies Act of 1978 (PURPA) and the Commission's implementing... rights under PURPA and FERC's implementing regulations and find that the MISO QF Integration Plan is...
10 CFR Appendixes O-P to Part 50 - [Reserved
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false [Reserved] O Appendixes O-P to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendixes O-P to Part 50 [Reserved] ...
10 CFR Appendixes O-P to Part 50 - [Reserved
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false [Reserved] O Appendixes O-P to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendixes O-P to Part 50 [Reserved] ...
10 CFR Appendixes O-P to Part 50 - [Reserved
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false [Reserved] O Appendixes O-P to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendixes O-P to Part 50 [Reserved] ...
10 CFR Appendixes O-P to Part 50 - [Reserved
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false [Reserved] O Appendixes O-P to Part 50 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Appendixes O-P to Part 50 [Reserved] ...
Transitioning the California Energy Commission Eligible Equipment List to a National Platform
DOE Office of Scientific and Technical Information (OSTI.GOV)
Truitt, Sarah; Nobler, Erin; Krasko, Vitaliy
The Energy Commission called on the National Renewable Energy Laboratory's (NREL)'s Solar Technical Assistance Team to explore various pathways for supporting continued evolution of the list. NREL staff utilized the Database of State Incentives for Renewables and Efficiency (DSIRE), California Solar Initiative (CSI) data, and information from in-depth interviews to better understand the impact of a lack of an updated list and suggest potential solutions. A total of 18 people from state energy offices, rebate program administrators, utilities, national testing laboratories, private companies, nonprofit organizations, and the federal government were interviewed between July and September 2013. CSI data were analyzedmore » to illustrate the monetary benefits of the algorithm behind calculating performance of PV modules included on the list. The primary objectives of this study are to: 1) Determine the impact of not maintaining the list, and 2) Explore alternatives to the State of California's maintenance of the list.« less
Thurber, Raymond; Read, Linda Eklof
2008-01-01
This article describes how education specialists from a 359-bed acute care hospital in the Northeast developed and implemented a comprehensive educational plan to prepare all staff members on the Joint Commission on Accreditation of Healthcare Organizations (JCAHO) tracer methodology and upcoming triennial survey. This methodology can be utilized by staff development educators in any setting to not only prepare staff members for a successful JCAHO survey but also to meet or exceed JCAHO standards in one's everyday job.
77 FR 43592 - Public Utility District No. 1 of Snohomish County, WA; Notice of Technical Meeting
Federal Register 2010, 2011, 2012, 2013, 2014
2012-07-25
... issues raised by PC Landing and the Federal Communications Commission regarding the proximity of the proposed Admiralty Inlet Tidal Project to PC Landing's fiber optic communication cable, and discuss the...
47 CFR 27.51 - Equipment authorization.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 2 2010-10-01 2010-10-01 false Equipment authorization. 27.51 Section 27.51 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES Technical Standards § 27.51 Equipment authorization. (a) Each transmitter utilized for...
47 CFR 27.51 - Equipment authorization.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 2 2011-10-01 2011-10-01 false Equipment authorization. 27.51 Section 27.51 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) COMMON CARRIER SERVICES MISCELLANEOUS WIRELESS COMMUNICATIONS SERVICES Technical Standards § 27.51 Equipment authorization. (a) Each transmitter utilized for...
10 CFR 1.39 - Office of Human Resources.
Code of Federal Regulations, 2011 CFR
2011-01-01
..., programs, and services to provide for the effective organization, utilization, and development of the... NUCLEAR REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters Staff Offices... employees; and (f) Provides executive resources management and organizational and managerial development...
10 CFR 1.39 - Office of Human Resources.
Code of Federal Regulations, 2010 CFR
2010-01-01
..., programs, and services to provide for the effective organization, utilization, and development of the... NUCLEAR REGULATORY COMMISSION STATEMENT OF ORGANIZATION AND GENERAL INFORMATION Headquarters Staff Offices... employees; and (f) Provides executive resources management and organizational and managerial development...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-28
...; (c) ways to enhance the quality, utility, and clarity of the information collected; (d) ways to... an applicant agrees to eliminate any harmful interference caused by the operation to TV reception on...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-30
... quality, utility, and clarity of the information collected; ways to minimize the burden of the collection... noncommercial FM and TV broadcast station is required to file an Ownership Report for Noncommercial Educational...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-22
...The Federal Communications Commission, as part of its continuing effort to reduce paperwork burden invites the general public and other Federal agencies to take this opportunity to comment on the following information collection(s), as required by the Paperwork Reduction Act (PRA) of 1995, 44 U.S.C. 3501-3520. Comments are requested concerning: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information shall have practical utility; (b) the accuracy of the Commission's burden estimate; (c) ways to enhance the quality, utility, and clarity of the information collected; and (d) ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology, and (e) ways to further reduce the information collection burden for small business concerns with fewer than 25 employees. The FCC may not conduct or sponsor a collection of information unless it displays a currently valid control number. No person shall be subject to any penalty for failing to comply with a collection of information subject to the Paperwork Reduction Act (PRA) that does not display a currently valid OMB control number.
Federal Register 2010, 2011, 2012, 2013, 2014
2011-02-10
...The Federal Communications Commission, as part of its continuing effort to reduce paperwork burden invites the general public and other Federal agencies to take this opportunity to comment on the following information collection(s), as required by the Paperwork Reduction Act (PRA) of 1995, 44 U.S.C. 3501-3520. Comments are requested concerning: (a) Whether the proposed collection of information is necessary for the proper performance of the functions of the Commission, including whether the information shall have practical utility; (b) the accuracy of the Commission's burden estimate; (c) ways to enhance the quality, utility, and clarity of the information collected; (d) ways to minimize the burden of the collection of information on the respondents, including the use of automated collection techniques or other forms of information technology, and (e) ways to further reduce the information collection burden on small business concerns with fewer than 25 employees. The FCC may not conduct or sponsor a collection of information unless it displays a currently valid OMB control number. No person shall be subject to any penalty for failing to comply with a collection of information subject to the Paperwork Reduction Act (PRA) that does not display a currently valid OMB control number.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Morgan, R.
1980-07-01
The Missouri Public Service Commission's refusal to let the Kansas City utility include a new plant in its rate base because the utility already has excess capacity could set a precedent for halting expansion plans across the country. The Missouri PSC staff accused the utility of ignoring conservation goals, distorting facts, and planning to speculate on the wholesale power market at the ratepayers' expense. Other state regulators unhappy with poor utility planning can be expected to take a good look at the Missouri decision. Regulators in New Jersey and Pennsylvania have already taken a hard line with the nuclear industrymore » since the Three Mile Island accident. (DCK)« less
47 CFR 1.2202 - Competitive bidding design options.
Code of Federal Regulations, 2014 CFR
2014-10-01
... Section 1.2202 Telecommunication FEDERAL COMMUNICATIONS COMMISSION GENERAL PRACTICE AND PROCEDURE Grants...) Procedures that utilize mathematical computer optimization software, such as integer programming, to evaluate... evaluating bids using a ranking based on specified factors. (B) Procedures that combine computer optimization...
Woodburn port-of-entry automation project, 1986 - 1993 : final report.
DOT National Transportation Integrated Search
1994-07-01
In 1986, the Oregon State Highway Division (OSHD), in conjunction with the Public Utility Commission (PUC), and with the cooperation of the Federal Highway Administration (FHWA), under took an experimental project at the Woodburn southbound Port-of-E...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-12-04
... industry, as defined by the Standard Industrial Classification Codes utilized by the Division of Corporate Finance of the Commission.\\26\\ This limitation does not apply to investments in securities issued or...
77 FR 16544 - City of New Martinsville, WV; Notice of Petition for Enforcement
Federal Register 2010, 2011, 2012, 2013, 2014
2012-03-21
... 210(h)(2)(B) of the Public Utility Regulatory Policies Act of 1978 (PURPA), the City of New... such other relief as the Commission may deem proper in order to remedy the PSC's violations of PURPA...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-11-09
... practical utility; (b) the accuracy of the Commission's burden estimate; (c) ways to enhance the quality... impact(s). Needs and Uses: Each licensee/permittee of a noncommercial FM and TV broadcast station is...
47 CFR 52.15 - Central office code administration.
Code of Federal Regulations, 2011 CFR
2011-10-01
... assignment databases; (3) Conducting the Numbering Resource Utilization and Forecast (NRUF) data collection... telecommunications carrier that receives numbering resources from the NANPA, a Pooling Administrator or another... Administrator. (2) State commissions may investigate and determine whether service providers have activated...
47 CFR 52.15 - Central office code administration.
Code of Federal Regulations, 2014 CFR
2014-10-01
... assignment databases; (3) Conducting the Numbering Resource Utilization and Forecast (NRUF) data collection... telecommunications carrier that receives numbering resources from the NANPA, a Pooling Administrator or another... Administrator. (2) State commissions may investigate and determine whether service providers have activated...
47 CFR 52.15 - Central office code administration.
Code of Federal Regulations, 2013 CFR
2013-10-01
... assignment databases; (3) Conducting the Numbering Resource Utilization and Forecast (NRUF) data collection... telecommunications carrier that receives numbering resources from the NANPA, a Pooling Administrator or another... Administrator. (2) State commissions may investigate and determine whether service providers have activated...
Audio visual summary: Implementing PURPA in Mid-America
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
The audio-visual presentation, Implementing PURPA in Mid-America, is a slide presentation designed to complement deliverable W-101-2, a booklet entitled Implementing PURPA in Mid-America: A Guide to the Public Utility Regulatory Policies Act. The presentation lasts 10 to 12 min and explains the major sections of PURPA, the rules promulgated by the Federal Energy Regulatory Commission to implement PURPA, and the implications of PURPA and its rules. It delineates the rights and responsibilities of citizens who want to sell electricity to utilities, explains the certification process, and discusses the rights and responsibilities of the utilities.
Feeling of competition may raise utility efficiency
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1983-05-01
In an attempt to provide the Federal Energy Regulatory Commission (FERC) with a means of encouragement to regulated but non-competitive utilities to offer their customers the lowest possible rates, the Resources Consulting Group Inc. (RCG) devised an incentive regulation program that would award payments to those utilities that are able to reduce the level of and growth in rates. The program has the advantages of promoting the minimization of costs better than traditional regulation does; cost cuts are encouraged in consideration of both long- and short-term resource production and utilization; and ratepayers are able to achieve the greatest possible sharemore » of economic benefits associated with improved performance.« less
2008-04-01
consumers and electric utilities in Arizona and Southern California. Twelve people, including five children, died as a result of the explosion. The...Modern electronics, communications, pro- tection, control and computers have allowed the physical system to be utilized fully with ever smaller... margins for error. Therefore, a relatively modest upset to the system can cause functional collapse. As the system grows in complexity and interdependence
1985-11-01
arranged to maximize thermal output; - Plant will meet PURPA criteria for recognition as a "Qualifying Facility" (QF). 7587A 2 - GFC emissions will be...10. Plant must meet Public Utilities Regulatory Policies Act ( PURPA ) criteria for classification as a "Qualifying Facility" (QF). 11. Visual effect...assessments. 3 The Public Utilities Regulatory Policies Act ( PURPA ) which is administered by the Federal Energy Regulatory Commission (FERC), governs how a
Some Early Unconventional Wisdom on Utility Regulation
ERIC Educational Resources Information Center
Breit, William
1970-01-01
A review of Quarterly articles on economics. Two articles by R.H. Montgomery are reprinted: Judicial Fair Value and the Price Level," 1925 (Interstate Commerce Commission railway rates), and, Like it is: The Impact of Science on Culture", 1931 (regulation of business). (SE)
Federal Register 2010, 2011, 2012, 2013, 2014
2010-03-19
...] Lower Colorado River Authority Transmission Services Corporation; Construction, Operation, Maintenance... activities associated with LCRA TSC's construction, maintenance, operation, and repair of four Competitive..., substation upgrades, and access roads) required to be constructed by the Public Utility Commission of Texas...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-01-26
... Red Lake Dam Hydroelectric Project. f. Location: On Red River in Shawano County, Wisconsin. No federal... Reference Room or may be viewed on the Commission's Web site ( http://www.ferc.gov ), using the ``eLibrary...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Charter. 16.6 Section 16.6 Commercial Practices FEDERAL TRADE COMMISSION ORGANIZATION, PROCEDURES AND RULES OF PRACTICE ADVISORY COMMITTEE MANAGEMENT § 16.6 Charter. (a) No advisory committee established, utilized, reestablished or renewed by the...
14 CFR 23.1397 - Color specifications.
Code of Federal Regulations, 2012 CFR
2012-01-01
... AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Equipment Lights § 23.1397 Color specifications. Each position light color must have the applicable International Commission on... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Color specifications. 23.1397 Section 23...
14 CFR 23.1397 - Color specifications.
Code of Federal Regulations, 2013 CFR
2013-01-01
... AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Equipment Lights § 23.1397 Color specifications. Each position light color must have the applicable International Commission on... 14 Aeronautics and Space 1 2013-01-01 2013-01-01 false Color specifications. 23.1397 Section 23...
14 CFR 23.1397 - Color specifications.
Code of Federal Regulations, 2011 CFR
2011-01-01
... AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Equipment Lights § 23.1397 Color specifications. Each position light color must have the applicable International Commission on... 14 Aeronautics and Space 1 2011-01-01 2011-01-01 false Color specifications. 23.1397 Section 23...
14 CFR 23.1397 - Color specifications.
Code of Federal Regulations, 2014 CFR
2014-01-01
... AIRWORTHINESS STANDARDS: NORMAL, UTILITY, ACROBATIC, AND COMMUTER CATEGORY AIRPLANES Equipment Lights § 23.1397 Color specifications. Each position light color must have the applicable International Commission on... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Color specifications. 23.1397 Section 23...
Resolutions Approved at Governor's Conference on Aging.
ERIC Educational Resources Information Center
1975
This paper presents the resolutions adopted at Ohio's 1975 Governor's Conference on Aging. The Commission on Aging views these resolutions as a blueprint for action and includes resolutions on such topics as rural and urban transportation, medical services, utilities and housing. (Author/HMV)
DOT National Transportation Integrated Search
2003-01-01
In order to provide a better understanding of how transportation is both affected and utilized in an emergency situation, the Federal Highway Administration (FHWA) commissioned a series of four case studies examining the effects of catastrophic event...
16 CFR 432.5 - Prohibited disclosures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 16 Commercial Practices 1 2011-01-01 2011-01-01 false Prohibited disclosures. 432.5 Section 432.5 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES POWER OUTPUT CLAIMS FOR AMPLIFIERS UTILIZED IN HOME ENTERTAINMENT PRODUCTS § 432.5 Prohibited disclosures. No performance characteristics to...
16 CFR 432.5 - Prohibited disclosures.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 16 Commercial Practices 1 2014-01-01 2014-01-01 false Prohibited disclosures. 432.5 Section 432.5 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES POWER OUTPUT CLAIMS FOR AMPLIFIERS UTILIZED IN HOME ENTERTAINMENT PRODUCTS § 432.5 Prohibited disclosures. No performance characteristics to...
16 CFR 432.4 - Optional disclosures.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 16 Commercial Practices 1 2011-01-01 2011-01-01 false Optional disclosures. 432.4 Section 432.4 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES POWER OUTPUT CLAIMS FOR AMPLIFIERS UTILIZED IN HOME ENTERTAINMENT PRODUCTS § 432.4 Optional disclosures. Other operating characteristics and...
16 CFR 432.4 - Optional disclosures.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 16 Commercial Practices 1 2012-01-01 2012-01-01 false Optional disclosures. 432.4 Section 432.4 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES POWER OUTPUT CLAIMS FOR AMPLIFIERS UTILIZED IN HOME ENTERTAINMENT PRODUCTS § 432.4 Optional disclosures. Other operating characteristics and...
16 CFR 432.5 - Prohibited disclosures.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 16 Commercial Practices 1 2013-01-01 2013-01-01 false Prohibited disclosures. 432.5 Section 432.5 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES POWER OUTPUT CLAIMS FOR AMPLIFIERS UTILIZED IN HOME ENTERTAINMENT PRODUCTS § 432.5 Prohibited disclosures. No performance characteristics to...
16 CFR 432.5 - Prohibited disclosures.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 16 Commercial Practices 1 2012-01-01 2012-01-01 false Prohibited disclosures. 432.5 Section 432.5 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES POWER OUTPUT CLAIMS FOR AMPLIFIERS UTILIZED IN HOME ENTERTAINMENT PRODUCTS § 432.5 Prohibited disclosures. No performance characteristics to...
16 CFR 432.4 - Optional disclosures.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 16 Commercial Practices 1 2014-01-01 2014-01-01 false Optional disclosures. 432.4 Section 432.4 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES POWER OUTPUT CLAIMS FOR AMPLIFIERS UTILIZED IN HOME ENTERTAINMENT PRODUCTS § 432.4 Optional disclosures. Other operating characteristics and...
16 CFR 432.4 - Optional disclosures.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 16 Commercial Practices 1 2013-01-01 2013-01-01 false Optional disclosures. 432.4 Section 432.4 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES POWER OUTPUT CLAIMS FOR AMPLIFIERS UTILIZED IN HOME ENTERTAINMENT PRODUCTS § 432.4 Optional disclosures. Other operating characteristics and...
16 CFR 432.5 - Prohibited disclosures.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 16 Commercial Practices 1 2010-01-01 2010-01-01 false Prohibited disclosures. 432.5 Section 432.5 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES POWER OUTPUT CLAIMS FOR AMPLIFIERS UTILIZED IN HOME ENTERTAINMENT PRODUCTS § 432.5 Prohibited disclosures. No performance characteristics to...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Definitions. 34.3 Section 34.3 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC..., and other societal and socioeconomic considerations, and in relation to utilization of nuclear energy...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Definitions. 34.3 Section 34.3 Energy NUCLEAR REGULATORY COMMISSION LICENSES FOR INDUSTRIAL RADIOGRAPHY AND RADIATION SAFETY REQUIREMENTS FOR INDUSTRIAL RADIOGRAPHIC..., and other societal and socioeconomic considerations, and in relation to utilization of nuclear energy...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-01-06
... establishment of an industry in the United States is materially retarded, by reason of imports from China and... February 13, 2012. The Commission's views are due at Commerce within five business days thereafter, or by...
17 CFR 250.81 - Exempted transactions.
Code of Federal Regulations, 2011 CFR
2011-04-01
... orders of the Commission pertaining to the performance of services or construction or the sale of goods shall not be applicable to the sale of water, telephone service, transportation, or a similar commodity... RULES AND REGULATIONS, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935 Service, Sales and Construction...
17 CFR 250.81 - Exempted transactions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... orders of the Commission pertaining to the performance of services or construction or the sale of goods shall not be applicable to the sale of water, telephone service, transportation, or a similar commodity... RULES AND REGULATIONS, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935 Service, Sales and Construction...
10 CFR 50.34 - Contents of applications; technical information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... of ten. The manufacturing license will require the plant design to be updated no later than 5 years..., each applicant for a design certification, design approval, combined license, or manufacturing license... Section 50.34 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION...
18 CFR 35.32 - General provisions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... prudent investor would use in the same circumstances. The term “prudent investor” means a prudent investor... separate account of the Commission-jurisdictional monies shall be maintained. (2) The utility may provide.... Washington, DC or at the National Archives and Records Administration (NARA). For information on the...
18 CFR 35.23 - General provisions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... costs, such utility may make an abbreviated rate filing detailing how it will recover emissions... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false General provisions. 35.23 Section 35.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION...
18 CFR 35.23 - General provisions.
Code of Federal Regulations, 2011 CFR
2011-04-01
... costs, such utility may make an abbreviated rate filing detailing how it will recover emissions... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false General provisions. 35.23 Section 35.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION...
18 CFR 125.2 - General instructions.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false General instructions. 125.2 Section 125.2 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY ACCOUNTS, FEDERAL POWER ACT PRESERVATION OF RECORDS OF PUBLIC UTILITIES AND LICENSEES...
18 CFR 125.2 - General instructions.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false General instructions. 125.2 Section 125.2 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY ACCOUNTS, FEDERAL POWER ACT PRESERVATION OF RECORDS OF PUBLIC UTILITIES AND LICENSEES...
18 CFR 125.2 - General instructions.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false General instructions. 125.2 Section 125.2 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY ACCOUNTS, FEDERAL POWER ACT PRESERVATION OF RECORDS OF PUBLIC UTILITIES AND LICENSEES...
77 FR 58365 - Commission Information Collection Activities (FERC-912); Comment Request; Extension
Federal Register 2010, 2011, 2012, 2013, 2014
2012-09-20
... collection, FERC-912, Cogeneration and Small Power Production, PURPA Section 210(m) Regulations for...-0873. SUPPLEMENTARY INFORMATION: Title: FERC-912, Cogeneration and Small Power Production, PURPA... the Public Utility Regulatory Policies Act of 1978 (PURPA) by adding subsection ``(m)'' that provides...
16 CFR 432.2 - Required disclosures.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 16 Commercial Practices 1 2013-01-01 2013-01-01 false Required disclosures. 432.2 Section 432.2 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES POWER OUTPUT CLAIMS FOR AMPLIFIERS UTILIZED IN HOME ENTERTAINMENT PRODUCTS § 432.2 Required disclosures. (a) Whenever any direct or indirect...
16 CFR 432.2 - Required disclosures.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 16 Commercial Practices 1 2014-01-01 2014-01-01 false Required disclosures. 432.2 Section 432.2 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES POWER OUTPUT CLAIMS FOR AMPLIFIERS UTILIZED IN HOME ENTERTAINMENT PRODUCTS § 432.2 Required disclosures. (a) Whenever any direct or indirect...
16 CFR 432.2 - Required disclosures.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 16 Commercial Practices 1 2012-01-01 2012-01-01 false Required disclosures. 432.2 Section 432.2 Commercial Practices FEDERAL TRADE COMMISSION TRADE REGULATION RULES POWER OUTPUT CLAIMS FOR AMPLIFIERS UTILIZED IN HOME ENTERTAINMENT PRODUCTS § 432.2 Required disclosures. (a) Whenever any direct or indirect...
76 FR 65504 - Proposed Agency Information Collection
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-21
..., including the validity of the methodology and assumptions used; (c) ways to enhance the quality, utility... Reliability Standard, FAC- 008-3--Facility Ratings, developed by the North American Electric Reliability... Reliability Standard FAC- 008-3 is pending before the Commission. The proposed Reliability Standard modifies...
Code of Federal Regulations, 2011 CFR
2011-04-01
..., or controls facilities used for the transmission of electric energy in interstate commerce or for the sale of electric energy at wholesale in interstate commerce and to any non-public utility that seeks... Section 38.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF...
Code of Federal Regulations, 2010 CFR
2010-04-01
..., or controls facilities used for the transmission of electric energy in interstate commerce or for the sale of electric energy at wholesale in interstate commerce and to any non-public utility that seeks... Section 38.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF...
Environmental externalities: Thinking globally, taxing locally
DOE Office of Scientific and Technical Information (OSTI.GOV)
Trisko, E.M.
1993-03-01
Assigning monetary externality values to the airborne emissions of electric power plants is gaining the attention of state utility commissions as a means to measure the social costs of alternative energy investments. Some commissions are using environmental externalities to encourage utility investments in energy conservation and renewable energy technologies such as solar, wind, and biomass. However, the monetization of externalities through so-called adders to direct generation costs can lead to inefficient resource allocation and expose consumers to electric rate increases without corresponding environmental benefits. The addition of externality values to direct electric generation costs distorts the economics of power supplymore » planning by creating artificial subsidies for generation sources that are not currently competitive in the market. Businesses and consumers will be forced to support higher-cost sources of electric generation as a consequence. Because pollutant emissions of all new sources of electric generation are stringently regulated, and generally are well below those of existing fossil-fired sources, little demonstrable environmental benefit would result from the expanded use of externality valuation.« less
[Evaluation of the medical value of a drug. A necessity for the Transparency Commission].
Avouac, B
1992-01-01
The marketing approval (AMM) is based on criteria of pharmaceutical quality, efficacy and safety of use. Before marketing, the data are collected by means of double-blind, randomized, prospective clinical trials that compare the study product to a reference product. A post-AMM assessment is needed to define the increase of the medical benefit (ASMR) and the therapeutic value of the new drugs. The quantification of the ASMR is essential for registration on the list of drugs reimbursable for those who benefit from Social Security. The evaluation of the therapeutic value and the nature of the affection treated are the criteria upon which the reimbursement ratio is chosen. After marketing, the reevaluation of the medical benefit and the drugs' usefulness may be compared to the treatment's net medical cost (direct + indirect cost--avoided cost) in cost/utility or cost/benefit studies. The Transparency Commission has worked out a scale of assessment of the ASMR which will orient recommendation, or non-recommendation, of registration on the list of reimbursable drugs as well as price fixing proposals. In the future, the Transparency Commission is to strengthen its position regarding the good use of the drug through a better prescriber information system. Thanks to the pharmaco-epidemiology and the pharmaco-vigilance data, the Transparency Commission will be able to guarantee the post-marketing follow-up of the drugs. The examination of the products' conditions of use, the reevaluation of the treatment's advantages based on the utility studies and the epidemiological surveys, and the cost-benefit studies will contribute to a medical control of health spending linked to drug consumption.
Report of the International Commission on Earthquake Forecasting for Civil Protection (Invited)
NASA Astrophysics Data System (ADS)
Jordan, T. H.
2009-12-01
The destructive L’Aquila earthquake of 6 April 2009 (Mw 6.3) illustrates the challenges of operational earthquake forecasting. The earthquake ruptured a mapped normal fault in a region identified by long-term forecasting models as one of the most seismically dangerous in Italy; it was the strongest of a rich sequence that started several months earlier and included a M3.9 foreshock less than five hours prior to the mainshock. According to widely circulated news reports, the earthquake had been predicted by a local resident using unpublished radon-based techniques, provoking a public controversy prior to the event that intensified in its wake. Several weeks after the earthquake, the Italian Department of Civil Protection appointed an international commission with the mandate to report on the current state of knowledge of prediction and forecasting and guidelines for operational utilization. The commission included geoscientists from China, France, Germany, Greece, Italy, Japan, Russia, United Kingdom, and United States with experience in earthquake forecasting and prediction. This presentation by the chair of the commission will report on its findings and recommendations.
2013-08-01
Wildlife Service VOC volatile organic compound WG/CC Wing, Commanding Officer WSSC Washington Suburban Sanitary Commission WWTP waste water...2009a). 3.3 Infrastructure and Utilities 3.3.1 Wastewater Collection and Treatment Sanitary Sewer The sanitary sewer system at JBA was privatized...in February 2006. Terrapin Utility Services, Inc., owns and operates the sanitary sewer system (JBA-NAFW 2013). The majority of the sanitary sewer
2000-06-20
smoothing and regression which includes curve fitting are two principle forecasting model types utilized in the vast majority of forecasting applications ... model were compared against the VA Office of Policy and Planning forecasting study commissioned with the actuarial firm of Milliman & Robertson (M & R... Application to the Veterans Healthcare System The development of a model to forecast future VEV needs, utilization, and cost of the Acute Care and
DOT National Transportation Integrated Search
2014-07-01
The Federal Highway Administration (FHWA) commissioned a review of transportation corridor plans to determine the extent to which these plans have utilized FHWA's Planning and Environment Linkages (PEL) approach, as described in the FHWA Guidance on ...
77 FR 23514 - Submission for OMB Review; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-19
... purchaser, prior to or at the time of purchase, a signed document acknowledging the restrictions on... with. This requirement enhances the Commission's ability to monitor utilization of and compliance with... does not include in the estimate of average burden hours the time preparing registration statements and...
17 CFR 256.123 - Investment in associate companies.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Investment in associate companies. 256.123 Section 256.123 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION... UTILITY HOLDING COMPANY ACT OF 1935 2. Investments § 256.123 Investment in associate companies. This...
75 FR 39200 - Periodic Reporting
Federal Register 2010, 2011, 2012, 2013, 2014
2010-07-08
... using an alternative sample frame. Establishing this docket will allow the Commission to consider the... Information System/Revenue Pieces and Weight (ODIS/RPW) data by 20 percent. Id. at 3. In effect, Proposal Two... sample size to a special study utilizing an alternative sample frame. The alternative sample frame that...
17 CFR 256.123 - Investment in associate companies.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 17 Commodity and Securities Exchanges 3 2011-04-01 2011-04-01 false Investment in associate companies. 256.123 Section 256.123 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION... UTILITY HOLDING COMPANY ACT OF 1935 2. Investments § 256.123 Investment in associate companies. This...
10 CFR 55.59 - Requalification.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10, chapter I, Code of Federal Regulations. (3) On-the-job training. The requalification program must include on-the-job training so that— (i) Each licensed operator of a utilization facility manipulates the... throughout the retention period specified by each Commission regulation. The record may be the original or a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-07-25
...-17-000] Communication of Operational Information Between Natural Gas Pipelines and Electric... the Commission's regulations to provide explicit authority to interstate natural gas pipelines and... explicit authority to interstate natural gas pipelines and public utilities that own, operate, or control...
47 CFR 76.1204 - Availability of equipment performing conditional access or security functions.
Code of Federal Regulations, 2011 CFR
2011-10-01
... system; and (3) Does not provide access to any digital transmission of multichannel video programming or... COMMISSION (CONTINUED) BROADCAST RADIO SERVICES MULTICHANNEL VIDEO AND CABLE TELEVISION SERVICE Competitive... security functions. (a)(1) A multichannel video programming distributor that utilizes navigation devices to...
Code of Federal Regulations, 2014 CFR
2014-01-01
... and nature of the risk of injury part 1205 is designed to eliminate or reduce. (1) The Commission... increase their utility. In the first place, consumers are likely to experience an increased sense of... (GSA) shows that almost all users appreciated the safety features on brake-clutch mowers. In addition...
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Rents. 367.82 Section 367.82 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Scope. 20.1002 Section 20.1002 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION General Provisions § 20.1002 Scope. The regulations in... byproduct, source, or special nuclear material or to operate a production or utilization facility under...
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Scope. 20.1002 Section 20.1002 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION General Provisions § 20.1002 Scope. The regulations in... byproduct, source, or special nuclear material or to operate a production or utilization facility under...
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Scope. 20.1002 Section 20.1002 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION General Provisions § 20.1002 Scope. The regulations in... byproduct, source, or special nuclear material or to operate a production or utilization facility under...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Scope. 20.1002 Section 20.1002 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION General Provisions § 20.1002 Scope. The regulations in... byproduct, source, or special nuclear material or to operate a production or utilization facility under...
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Scope. 20.1002 Section 20.1002 Energy NUCLEAR REGULATORY COMMISSION STANDARDS FOR PROTECTION AGAINST RADIATION General Provisions § 20.1002 Scope. The regulations in... byproduct, source, or special nuclear material or to operate a production or utilization facility under...
17 CFR 256.01-6 - Departmental classification required.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Departmental classification required. 256.01-6 Section 256.01-6 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION... UTILITY HOLDING COMPANY ACT OF 1935 General Instructions § 256.01-6 Departmental classification required...
10 CFR 50.9 - Completeness and accuracy of information.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Completeness and accuracy of information. 50.9 Section 50.9 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES... appropriate Regional Office within two working days of identifying the information. This requirement is not...
10 CFR 50.9 - Completeness and accuracy of information.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Completeness and accuracy of information. 50.9 Section 50.9 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES... appropriate Regional Office within two working days of identifying the information. This requirement is not...
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 2 2014-01-01 2014-01-01 false Scope. 55.2 Section 55.2 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES General Provisions § 55.2 Scope. The regulations in this part apply to— (a) Any individual who manipulates the controls of any utilization facility licensed under...
10 CFR 50.9 - Completeness and accuracy of information.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Completeness and accuracy of information. 50.9 Section 50.9 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES... appropriate Regional Office within two working days of identifying the information. This requirement is not...
10 CFR 50.9 - Completeness and accuracy of information.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Completeness and accuracy of information. 50.9 Section 50.9 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES... appropriate Regional Office within two working days of identifying the information. This requirement is not...
10 CFR 50.9 - Completeness and accuracy of information.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Completeness and accuracy of information. 50.9 Section 50.9 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES... appropriate Regional Office within two working days of identifying the information. This requirement is not...
77 FR 28866 - Pivotal Utility Holdings, Inc. d/b/a Elkton Gas; Notice of Application
Federal Register 2010, 2011, 2012, 2013, 2014
2012-05-16
... section 311 of the Natural Gas Policy Act of 1978 (NGPA); and (ii) a waiver of the Commission's accounting... comments may be filed electronically via the Internet in lieu of paper, see, 18 CFR 385.2001(a)(1)(iii) and...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-19
... each connected to 2 generating units converting the power to 230 kV; (8) two 41-miles-long, 230-kV... Draft EA April 2011. Commission issues Final EA October 2011. p. Final amendments to the application...
Code of Federal Regulations, 2010 CFR
2010-10-01
... the contract. A service contract or amendment becomes effective at 12:01 a.m. Eastern Standard Time on... automobile, pickup truck, minivan or sport utility vehicle. (n) Ocean common carrier means a common carrier...-tanker. (o) OIRM means the Commission's Office of Information and Resources Management. (p) Non-vessel...
17 CFR 256.310 - Aircraft and airport equipment.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 17 Commodity and Securities Exchanges 3 2011-04-01 2011-04-01 false Aircraft and airport equipment. 256.310 Section 256.310 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION... UTILITY HOLDING COMPANY ACT OF 1935 Service Company Property Accounts § 256.310 Aircraft and airport...
17 CFR 256.310 - Aircraft and airport equipment.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Aircraft and airport equipment. 256.310 Section 256.310 Commodity and Securities Exchanges SECURITIES AND EXCHANGE COMMISSION... UTILITY HOLDING COMPANY ACT OF 1935 Service Company Property Accounts § 256.310 Aircraft and airport...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-02-02
... penalty from the fee calculation is not adopted. 514.17 How are fingerprint processing fees collected by the Commission? Comment: Two commenters objected to fingerprint fees being included as a separate... fingerprints and not all tribes utilize the service. The service will continue to be charged as a separate fee...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-15
... Aerial Communications Architecture in Response to an Emergency AGENCY: Federal Communications Commission... deployable aerial communications architecture (DACA) in facilitating emergency response by rapidly restoring... copying during normal business hours in the FCC Reference Information Center, Portals II, 445 12th Street...
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 2 2010-01-01 2010-01-01 false Scope. 55.2 Section 55.2 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) OPERATORS' LICENSES General Provisions § 55.2 Scope. The regulations in this part apply to— (a) Any individual who manipulates the controls of any utilization facility licensed under...
18 CFR 367.3910 - Account 391, Office furniture and equipment.
Code of Federal Regulations, 2013 CFR
2013-04-01
... furniture and equipment. 367.3910 Section 367.3910 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005... other cabinets. (5) Floor covering. (6) Library and library equipment. (7) Mechanical office equipment...
18 CFR 367.3910 - Account 391, Office furniture and equipment.
Code of Federal Regulations, 2012 CFR
2012-04-01
... furniture and equipment. 367.3910 Section 367.3910 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005... other cabinets. (5) Floor covering. (6) Library and library equipment. (7) Mechanical office equipment...
18 CFR 367.3910 - Account 391, Office furniture and equipment.
Code of Federal Regulations, 2014 CFR
2014-04-01
... furniture and equipment. 367.3910 Section 367.3910 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005... other cabinets. (5) Floor covering. (6) Library and library equipment. (7) Mechanical office equipment...
47 CFR 80.76 - Requirements for land station control points.
Code of Federal Regulations, 2010 CFR
2010-10-01
.... 80.76 Section 80.76 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND... subject to this part must have the following facilities: (a) Except for marine utility stations, a visual indication of antenna current; or a pilot lamp, meter or equivalent device which provides continuous visual...
10 CFR 50.57 - Issuance of operating license. 1
Code of Federal Regulations, 2011 CFR
2011-01-01
... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...
10 CFR 50.57 - Issuance of operating license. 1
Code of Federal Regulations, 2014 CFR
2014-01-01
... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...
10 CFR 50.57 - Issuance of operating license. 1
Code of Federal Regulations, 2013 CFR
2013-01-01
... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...
10 CFR 50.57 - Issuance of operating license. 1
Code of Federal Regulations, 2012 CFR
2012-01-01
... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...
10 CFR 50.57 - Issuance of operating license. 1
Code of Federal Regulations, 2010 CFR
2010-01-01
... contested activity sought to be authorized. The Director of Nuclear Reactor Regulation will make findings on... Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance... presiding officer will issue an order in accordance with § 2.319(p) authorizing the Director of Nuclear...
10 CFR 50.91 - Notice for public comment; State consultation.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Notice for public comment; State consultation. 50.91 Section 50.91 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... consideration if it determines that the licensee has abused the emergency provision by failing to make timely...
77 FR 68759 - Combined Notice of Filings #2
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-16
... LLC, BE Rayle LLC, Cedar Brakes I, L.L.C., Cedar Brakes II, L.L.C., Central Power & Lime LLC, Triton Power Michigan LLC, Utility Contract Funding, L.L.C. Description: JPMorgan Sellers' Notice of Non... that the Commission received the following electric rate filings: Docket Numbers: ER10-1821-003...
78 FR 4142 - Combined Notice of Filings #1
Federal Register 2010, 2011, 2012, 2013, 2014
2013-01-18
... I, L.L.C., Cedar Brakes II, L.L.C., Central Power & Lime LLC, Utility Contract Funding, L.L.C... Energy Services, LLC, Champion Energy, LLC. Description: Updated Market Power Analysis for the Southwest... that the Commission received the following electric rate filings: Docket Numbers: ER10-2331-014; ER10...
A pilot study of a portable wood chipper
R. H. Fenton; H. A. McKusick
1950-01-01
A cooperative investigation carried on by the Connecticut State Park and Forest Commission and the Northeastern Forest Experiment Station in collaboration with the Northeastern Wood Utilization Council, Inc., the Fitchburg Engineering Company, the Connecticut Highway Department, and the Connecticut Board of Fisheries and Game. The authors acknowledge the generous...
77 FR 20437 - Agency Information Collection Activities: Proposed Collection; Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-04-04
... there a way to enhance the quality, utility, and clarity of the information to be collected? 4. How can... NUCLEAR REGULATORY COMMISSION [Docket No. NRC-2012-0027] Agency Information Collection Activities... action to submit an information collection request to the Office of Management and Budget (OMB) and...
76 FR 29744 - Monongahela Power Company, West Penn Power Company, The Potomac Edison Company, PJM...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-23
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. RC11-3-000] Monongahela Power Company, West Penn Power Company, The Potomac Edison Company, PJM Interconnection, L.L.C.; Notice... Potomac Edison Company (collectively, the Designated FirstEnergy Utilities), and PJM Interconnection, L.L...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-10-25
... Energy Inc FortisBC Energy (Vancouver Island) Inc. FortisBC Energy (Whistler) Inc... FortisBC Huntingdon Inc FortisBC Alternative Energy Services Inc. Fortis Generation East Limited FC13-11-000 Partnership... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission Notice of Effectiveness of Exempt...
18 CFR 35.30 - General provisions.
Code of Federal Regulations, 2014 CFR
2014-04-01
... utilities to the Administrator of the Bonneville Power Administration (BPA) at the average system cost (ASC... determined by BPA in accordance with 18 CFR part 301. (b) Effectiveness of rates. (1) During the period between the date of BPA's determination of ASC and the date of the final order issued by the Commission...
18 CFR 35.30 - General provisions.
Code of Federal Regulations, 2010 CFR
2010-04-01
... utilities to the Administrator of the Bonneville Power Administration (BPA) at the average system cost (ASC... determined by BPA in accordance with 18 CFR part 301. (b) Effectiveness of rates. (1) During the period between the date of BPA's determination of ASC and the date of the final order issued by the Commission...
18 CFR 35.30 - General provisions.
Code of Federal Regulations, 2012 CFR
2012-04-01
... utilities to the Administrator of the Bonneville Power Administration (BPA) at the average system cost (ASC... determined by BPA in accordance with 18 CFR part 301. (b) Effectiveness of rates. (1) During the period between the date of BPA's determination of ASC and the date of the final order issued by the Commission...
18 CFR 35.30 - General provisions.
Code of Federal Regulations, 2011 CFR
2011-04-01
... utilities to the Administrator of the Bonneville Power Administration (BPA) at the average system cost (ASC... determined by BPA in accordance with 18 CFR part 301. (b) Effectiveness of rates. (1) During the period between the date of BPA's determination of ASC and the date of the final order issued by the Commission...
18 CFR 35.30 - General provisions.
Code of Federal Regulations, 2013 CFR
2013-04-01
... utilities to the Administrator of the Bonneville Power Administration (BPA) at the average system cost (ASC... determined by BPA in accordance with 18 CFR part 301. (b) Effectiveness of rates. (1) During the period between the date of BPA's determination of ASC and the date of the final order issued by the Commission...
18 CFR 35.16 - Notice of succession.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Notice of succession. 35.16 Section 35.16 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... Filing Requirements § 35.16 Notice of succession. Whenever the name of a public utility is changed, or...
18 CFR 35.16 - Notice of succession.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Notice of succession. 35.16 Section 35.16 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... Filing Requirements § 35.16 Notice of succession. Whenever the name of a public utility is changed, or...
18 CFR 35.16 - Notice of succession.
Code of Federal Regulations, 2013 CFR
2013-04-01
... 18 Conservation of Power and Water Resources 1 2013-04-01 2013-04-01 false Notice of succession. 35.16 Section 35.16 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... Filing Requirements § 35.16 Notice of succession. Whenever the name of a public utility is changed, or...
18 CFR 35.16 - Notice of succession.
Code of Federal Regulations, 2014 CFR
2014-04-01
... 18 Conservation of Power and Water Resources 1 2014-04-01 2014-04-01 false Notice of succession. 35.16 Section 35.16 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... Filing Requirements § 35.16 Notice of succession. Whenever the name of a public utility is changed, or...
18 CFR 35.16 - Notice of succession.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Notice of succession. 35.16 Section 35.16 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... Filing Requirements § 35.16 Notice of succession. Whenever the name of a public utility is changed, or...
18 CFR 35.32 - General provisions.
Code of Federal Regulations, 2011 CFR
2011-04-01
... Chestnut Street, Philadelphia, PA 19104, and are also available in local law libraries. Copies may be inspected at the Federal Energy Regulatory Commission's Library, Room 95-01, 888 First Street, NE... relating to the Fund shall be open to inspection and audit at reasonable times by the utility or its...
17 CFR 210.9-04 - Income statements.
Code of Federal Regulations, 2011 CFR
2011-04-01
..., PUBLIC UTILITY HOLDING COMPANY ACT OF 1935, INVESTMENT COMPANY ACT OF 1940, INVESTMENT ADVISERS ACT OF 1940, AND ENERGY POLICY AND CONSERVATION ACT OF 1975 Bank Holding Companies § 210.9-04 Income... activities. (c) Insurance commissions, fees and premiums. (d) Fees for other customer services. (e) Profit or...
17 CFR 210.9-04 - Income statements.
Code of Federal Regulations, 2010 CFR
2010-04-01
..., PUBLIC UTILITY HOLDING COMPANY ACT OF 1935, INVESTMENT COMPANY ACT OF 1940, INVESTMENT ADVISERS ACT OF 1940, AND ENERGY POLICY AND CONSERVATION ACT OF 1975 Bank Holding Companies § 210.9-04 Income... activities. (c) Insurance commissions, fees and premiums. (d) Fees for other customer services. (e) Profit or...
77 FR 65508 - Annual Charge Filing Procedures for Natural Gas Pipelines
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-29
...] Annual Charge Filing Procedures for Natural Gas Pipelines AGENCY: Federal Energy Regulatory Commission... FERC) is proposing to amend its regulations to revise the filing requirements for natural gas pipelines...) clause. Currently, natural gas pipelines utilizing an ACA clause must make a tariff filing to reflect a...
Federal Register 2010, 2011, 2012, 2013, 2014
2013-03-12
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [ Docket No. AD12-12-000] Coordination Between Natural Gas and Electricity Markets; Notice of Technical Conference Take notice that the Federal... utilization of pipeline capacity. \\1\\ Coordination between Natural Gas and Electricity Markets, 141 FERC ] 61...
Justice in Flagstaff: Are These Rights Inalienable?
ERIC Educational Resources Information Center
Pares, Maria; And Others
Utilizing official records and reports, the Arizona Advisory Committee to the U.S. Commission on Civil Rights conducted an investigation of the criminal justice process afforded American Indians in Flagstaff, Arizona. The investigation focused on Indian treatment from arrest through sentencing and 2 days of informal hearings held in both Tucson…
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Definitions. 1b.1 Section 1b.1 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF... pipelines, electric utilities and hydroelectric projects. [43 FR 27174, June 23, 1978, as amended by Order...
10 CFR 2.643 - Acceptance and docketing of application for limited work authorization.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Acceptance and docketing of application for limited work authorization. 2.643 Section 2.643 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR DOMESTIC LICENSING... Construct Certain Utilization Facilities; and Advance Issuance of Limited Work Authorizations Phased...
18 CFR 5.1 - Applicability, definitions, and requirement to consult.
Code of Federal Regulations, 2014 CFR
2014-04-01
... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT INTEGRATED... an existing project subject to Sections 14 and 15 of the Federal Power Act; or (3) Subsequent license..., the Federal agency administering any United States lands utilized or occupied by the project, the...
18 CFR 5.1 - Applicability, definitions, and requirement to consult.
Code of Federal Regulations, 2012 CFR
2012-04-01
... ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT INTEGRATED... an existing project subject to Sections 14 and 15 of the Federal Power Act; or (3) Subsequent license..., the Federal agency administering any United States lands utilized or occupied by the project, the...
11 CFR 9039.3 - Examination and audits; investigations.
Code of Federal Regulations, 2010 CFR
2010-01-01
... inquiry. A decision to conduct an inquiry under this section may be based on information that is obtained... information obtained in the inquiry will be utilized in making the repayment determination. If the inquiry...; investigations. (a) General. (1) The Commission will consider information obtained in its continuing review under...
18 CFR 367.1310 - Account 131, Cash.
Code of Federal Regulations, 2010 CFR
2010-04-01
... THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL POWER ACT AND NATURAL GAS ACT Balance Sheet... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Account 131, Cash. 367.1310 Section 367.1310 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION...
National Policy and The Great Tuition Debate--Does This Man Have the Solution?
ERIC Educational Resources Information Center
Shaw, Jane S.
1974-01-01
Describes the 6 recommendations of the National Commission on the Financing of Postsecondary Education, including federal funding of undergraduate education through grants and loans, increase in tuition charges, full utilization of institutional resources, and continuation of tax incentives for voluntary support of higher education. (Author/PG)
18 CFR 292.204 - Criteria for qualifying small power production facilities.
Code of Federal Regulations, 2010 CFR
2010-04-01
... primary energy source of the facility must be biomass, waste, renewable resources, geothermal resources... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY... production facilities that use the same energy resource, are owned by the same person(s) or its affiliates...
18 CFR 292.204 - Criteria for qualifying small power production facilities.
Code of Federal Regulations, 2011 CFR
2011-04-01
... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY... production capacity of any other small power production facilities that use the same energy resource, are... production facilities within one mile of such facilities. (b) Fuel use. (1)(i) The primary energy source of...
18 CFR 292.601 - Exemption to qualifying facilities from the Federal Power Act.
Code of Federal Regulations, 2010 CFR
2010-04-01
... such facility uses any primary energy source other than geothermal resources. (c) General rule. Any... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY... Federal Power Act, except: (1) Sections 205 and 206; however, sales of energy or capacity made by...
DOE Office of Scientific and Technical Information (OSTI.GOV)
None, None
This paper is designed for companies looking to cut costs through energy savings, ratepayer-funded program administrators interested in increasing large industrial company participation in energy efficiency program offerings, and state utility commissions.
18 CFR 35.10b - Electric Quarterly Reports.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Electric Quarterly... Application § 35.10b Electric Quarterly Reports. Each public utility shall file an updated Electric Quarterly..., file by January 31. Electric Quarterly Reports must be prepared in conformance with the Commission's...
18 CFR 35.10b - Electric Quarterly Reports.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Electric Quarterly... Application § 35.10b Electric Quarterly Reports. Each public utility shall file an updated Electric Quarterly..., file by January 31. Electric Quarterly Reports must be prepared in conformance with the Commission's...
18 CFR 35.10b - Electric Quarterly Reports.
Code of Federal Regulations, 2012 CFR
2012-04-01
... 18 Conservation of Power and Water Resources 1 2012-04-01 2012-04-01 false Electric Quarterly... Application § 35.10b Electric Quarterly Reports. Each public utility shall file an updated Electric Quarterly..., file by January 31. Electric Quarterly Reports must be prepared in conformance with the Commission's...
47 CFR 80.72 - Antenna requirements for coast stations.
Code of Federal Regulations, 2012 CFR
2012-10-01
... 47 Telecommunication 5 2012-10-01 2012-10-01 false Antenna requirements for coast stations. 80.72 Section 80.72 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO... Stations § 80.72 Antenna requirements for coast stations. All emissions of a coast station a marine-utility...
47 CFR 80.72 - Antenna requirements for coast stations.
Code of Federal Regulations, 2010 CFR
2010-10-01
... 47 Telecommunication 5 2010-10-01 2010-10-01 false Antenna requirements for coast stations. 80.72 Section 80.72 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO... Stations § 80.72 Antenna requirements for coast stations. All emissions of a coast station a marine-utility...
47 CFR 80.72 - Antenna requirements for coast stations.
Code of Federal Regulations, 2014 CFR
2014-10-01
... 47 Telecommunication 5 2014-10-01 2014-10-01 false Antenna requirements for coast stations. 80.72 Section 80.72 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO... Stations § 80.72 Antenna requirements for coast stations. All emissions of a coast station a marine-utility...
47 CFR 80.72 - Antenna requirements for coast stations.
Code of Federal Regulations, 2011 CFR
2011-10-01
... 47 Telecommunication 5 2011-10-01 2011-10-01 false Antenna requirements for coast stations. 80.72 Section 80.72 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO... Stations § 80.72 Antenna requirements for coast stations. All emissions of a coast station a marine-utility...
47 CFR 80.72 - Antenna requirements for coast stations.
Code of Federal Regulations, 2013 CFR
2013-10-01
... 47 Telecommunication 5 2013-10-01 2013-10-01 false Antenna requirements for coast stations. 80.72 Section 80.72 Telecommunication FEDERAL COMMUNICATIONS COMMISSION (CONTINUED) SAFETY AND SPECIAL RADIO... Stations § 80.72 Antenna requirements for coast stations. All emissions of a coast station a marine-utility...
18 CFR 367.9210 - Account 921, Office supplies and expenses.
Code of Federal Regulations, 2010 CFR
2010-04-01
... supplies and expenses. 367.9210 Section 367.9210 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005... service expenses to include telephone, telegraph, wire transfer, micro-wave, and other similar items. (6...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-24
... each cost allocation method must satisfy six cost allocation principles. DATES: Effective November 23... Interregional Transmission 61 Coordination Requirements III. Cost Allocation 65 1. Cost Allocation Principle 2... must satisfy six cost allocation principles. 3. In Order No. 1000-A, the Commission largely affirmed...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-08-11
.... Each cost allocation method must satisfy six cost allocation principles. DATES: Effective Date: This... 86 c. Commission Determination 99 3. Regional Transmission Planning Principles........ 118 a.... Principles for Regional and Interregional Cost 585 Allocation 1. Use of a Principles-Based Approach 585 a...
25 CFR 700.157 - Actual reasonable moving and related expenses-nonresidential moves.
Code of Federal Regulations, 2010 CFR
2010-04-01
... of § 700.151(c) a certified eligible business, farm operation or nonprofit organization is entitled...-moves his business, farm operation, or nonprofit organization, the Commission may approve a payment for... and modifications necessary to adapt such property to the replacement structure or to the utilities or...
17 CFR 257.1 - General instructions.
Code of Federal Regulations, 2011 CFR
2011-04-01
...) PRESERVATION AND DESTRUCTION OF RECORDS OF REGISTERED PUBLIC UTILITY HOLDING COMPANIES AND OF MUTUAL AND... Commission, pursuant to § 250.88 to meet the requirements of section 13 of the Act as mutual or subsidiary... be preserved and, in the selection of storage space, safeguard such records from unnecessary exposure...
Under-Representation in Nationally Representative Secondary Data
ERIC Educational Resources Information Center
Frederick, Karen; Barnard-Brak, Lucy; Sulak, Tracey
2012-01-01
There has been a significant increase in the use of secondary data sets. Many such data sets purport to be nationally representative. Secondary data sets include research commissioned by the National Center for Education Statistics, the Centers for Disease Control, and other public entities. Research increasingly utilizes these secondary data in…
Code of Federal Regulations, 2013 CFR
2013-01-01
... and nature of the risk of injury part 1205 is designed to eliminate or reduce. (1) The Commission... increase their utility. In the first place, consumers are likely to experience an increased sense of... (GSA) shows that almost all users appreciated the safety features on brake-clutch mowers. In addition...
10 CFR 50.80 - Transfer of licenses.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Transfer of licenses. 50.80 Section 50.80 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Transfers of Licenses-Creditors' Rights-Surrender of Licenses § 50.80 Transfer of licenses. (a) No license for a production or...
10 CFR 50.80 - Transfer of licenses.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Transfer of licenses. 50.80 Section 50.80 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Transfers of Licenses-Creditors' Rights-Surrender of Licenses § 50.80 Transfer of licenses. (a) No license for a production or...
18 CFR 292.305 - Rates for sales.
Code of Federal Regulations, 2011 CFR
2011-04-01
... 18 Conservation of Power and Water Resources 1 2011-04-01 2011-04-01 false Rates for sales. 292.305 Section 292.305 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION... SECTIONS 201 AND 210 OF THE PUBLIC UTILITY REGULATORY POLICIES ACT OF 1978 WITH REGARD TO SMALL POWER...
17 CFR 250.102 - Effective date of rules.
Code of Federal Regulations, 2010 CFR
2010-04-01
... 17 Commodity and Securities Exchanges 3 2010-04-01 2010-04-01 false Effective date of rules. 250...) GENERAL RULES AND REGULATIONS, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935 Miscellaneous Rules § 250.102 Effective date of rules. Unless the Commission otherwise prescribes in any case, the manner of publication...
17 CFR 250.65 - Expenditures in connection with solicitation of proxies.
Code of Federal Regulations, 2010 CFR
2010-04-01
... EXCHANGE COMMISSION (CONTINUED) GENERAL RULES AND REGULATIONS, PUBLIC UTILITY HOLDING COMPANY ACT OF 1935... become effective in accordance with the procedure specified in § 250.23 and pursuant to the order of the... company or subsidiary thereof shall expend any money or other consideration in connection with the...
10 CFR 50.20 - Two classes of licenses.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Two classes of licenses. 50.20 Section 50.20 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Classification and Description of Licenses § 50.20 Two classes of licenses. Licenses will be issued to named persons...
77 FR 71186 - Commission Information Collection Activities (FERC-912); Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-11-29
... submitting the information collection FERC-912, Cogeneration and Small Power Production, PURPA Section 210(m... Production, PURPA Section 210(m) Regulations for Termination or Reinstatement of Obligation to Purchase or... Section 210 of the Public Utility Regulatory Policies Act of 1978 (PURPA) by adding subsection ``(m...
77 FR 38795 - Gerry E. Greenfield Jr.
Federal Register 2010, 2011, 2012, 2013, 2014
2012-06-29
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-78-000] Gerry E. Greenfield Jr. v. Benton County, WA; Notice of Petition To Enforce PURPA Take notice that on June 21, 2012, pursuant to section 210(h) of the Public Utility Regulatory Policies Act of 1978 (PURPA),\\1\\ Gerry E...
Federal Register 2010, 2011, 2012, 2013, 2014
2011-04-04
... CONTACT: Wireless Telecommunications Bureau, Auctions and Spectrum Access Division: Stephen Johnson... 25 employees. I. Synopsis 1. While competitive market forces have spurred robust wireless.... Although the Commission has adopted a range of programs intended to promote access to wireless radio and...
76 FR 30605 - Assessment and Collection of Regulatory Fees For Fiscal Year 2011
Federal Register 2010, 2011, 2012, 2013, 2014
2011-05-26
... the Wireless Telecommunications Bureau's Numbering Resource Utilization Forecast and Annual CMRS... compute their fee payment using the standard methodology \\32\\ that is currently in place for CMRS Wireless... Commission, Regulatory Fees Fact Sheet: What You Owe--Commercial Wireless Services for FY 2010 at 1 (released...
76 FR 64343 - Notice of Commission Staff Attendance
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-18
... may attend the following meetings related to the transmission planning activities of ISO New England... meetings are open to stakeholders. Further information may be found at http://www.iso-ne.com . The... No. ER11-4021, ISO New England Inc., Northeast Utilities Service Company. Docket No. ER11-4022, ISO...
Upgrading in an Industrial Setting. Final Report.
ERIC Educational Resources Information Center
Russell, Wendell
The project objectives were: (1) to assess existing industrial upgrading practices in an Atomic Energy Commission contractor organization, (2) to design new alternative upgrading methods, (3) to experiment with new upgrading methods, (4) to plan for utilization of proven upgrading programs, and (5) to document and disseminate activities. A twelve…
Code of Federal Regulations, 2010 CFR
2010-01-01
... Practices CONSUMER PRODUCT SAFETY COMMISSION FEDERAL HAZARDOUS SUBSTANCES ACT REGULATIONS FIREWORKS DEVICES § 1507.3 Fuses. (a) Fireworks devices that require a fuse shall: (1) Utilize only a fuse that has been... it will support either the weight of the fireworks device plus 8 ounces of dead weight or double the...
10 CFR 7.6 - Amendment to advisory committee charters.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Amendment to advisory committee charters. 7.6 Section 7.6 Energy NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEES § 7.6 Amendment to advisory committee charters. (a) Final authority for amending the charter of an NRC advisory committee established or utilized by...
10 CFR 7.6 - Amendment to advisory committee charters.
Code of Federal Regulations, 2012 CFR
2012-01-01
... 10 Energy 1 2012-01-01 2012-01-01 false Amendment to advisory committee charters. 7.6 Section 7.6 Energy NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEES § 7.6 Amendment to advisory committee charters. (a) Final authority for amending the charter of an NRC advisory committee established or utilized by...
10 CFR 7.6 - Amendment to advisory committee charters.
Code of Federal Regulations, 2014 CFR
2014-01-01
... 10 Energy 1 2014-01-01 2014-01-01 false Amendment to advisory committee charters. 7.6 Section 7.6 Energy NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEES § 7.6 Amendment to advisory committee charters. (a) Final authority for amending the charter of an NRC advisory committee established or utilized by...
77 FR 64495 - Commission Information Collection Activities (FERC-922); Comment Request
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-22
... submitting the new information collection FERC-922, ``Performance Metrics in Regions Outside ISOs and RTOs... RTOs. OMB Control No.: To be determined. Type of Request: Approval of a new information collection. Abstract: The collection of information requires those public utilities outside of ISOs and RTOs that...
76 FR 64340 - Combined Notice of Filings #1
Federal Register 2010, 2011, 2012, 2013, 2014
2011-10-18
... that the Commission received the following electric rate filings: Docket Numbers: ER11-4042-001...: FERC Electric Rate Schedule No. 43--SFA Compliance Filing to be effective 9/28/2011. Filed Date: 10/05... Power, LLC submits tariff filing per 35: Columbia Utilities Power FERC Electric Tariff to be effective 9...
10 CFR 50.44 - Combustible gas control for nuclear power reactors.
Code of Federal Regulations, 2013 CFR
2013-01-01
... 10 Energy 1 2013-01-01 2013-01-01 false Combustible gas control for nuclear power reactors. 50.44 Section 50.44 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... for nuclear power reactors. (a) Definitions—(1) Inerted atmosphere means a containment atmosphere with...
10 CFR 50.44 - Combustible gas control for nuclear power reactors.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Combustible gas control for nuclear power reactors. 50.44 Section 50.44 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION... for nuclear power reactors. (a) Definitions—(1) Inerted atmosphere means a containment atmosphere with...
75 FR 51027 - Commission Information Collection Activities (FERC-917 and FERC-918) 1
Federal Register 2010, 2011, 2012, 2013, 2014
2010-08-18
... public utilities, working through the North American Electric Reliability Corporation (NERC), to develop... required a NERC/NAESB \\3\\ team to draft and review Order No. 890 reliability standards and business... revise reliability standards to require the exchange of data and coordination among transmission...
10 CFR 50.78 - Facility information and verification.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Facility information and verification. 50.78 Section 50.78 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Us/iaea... International Atomic Energy Agency (IAEA) and take other action as necessary to implement the US/IAEA Safeguards...
10 CFR 50.78 - Facility information and verification.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Facility information and verification. 50.78 Section 50.78 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Us/iaea... International Atomic Energy Agency (IAEA) and take other action as necessary to implement the US/IAEA Safeguards...
10 CFR 7.6 - Amendment to advisory committee charters.
Code of Federal Regulations, 2010 CFR
2010-01-01
... 10 Energy 1 2010-01-01 2010-01-01 false Amendment to advisory committee charters. 7.6 Section 7.6 Energy NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEES § 7.6 Amendment to advisory committee charters. (a) Final authority for amending the charter of an NRC advisory committee established or utilized by...
10 CFR 7.6 - Amendment to advisory committee charters.
Code of Federal Regulations, 2011 CFR
2011-01-01
... 10 Energy 1 2011-01-01 2011-01-01 false Amendment to advisory committee charters. 7.6 Section 7.6 Energy NUCLEAR REGULATORY COMMISSION ADVISORY COMMITTEES § 7.6 Amendment to advisory committee charters. (a) Final authority for amending the charter of an NRC advisory committee established or utilized by...
78 FR 49490 - Commission Information Collection Activities (Ferc-511); Comment Request; Extension
Federal Register 2010, 2011, 2012, 2013, 2014
2013-08-14
... information collection, FERC-511 (Transfer of Electric License). DATES: Comments on the collection of...-0873. SUPPLEMENTARY INFORMATION: Title: Transfer of Electric License. OMB Control No.: 1902-0069... utilization of power.\\2\\ Section 8 of the FPA provides that the voluntary transfer of any license is made only...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-25
... to study the feasibility of the proposed San Onofre OWEG Electricity Farm Project (project). The proposed project would utilize 11,443 Ocean Wave Electricity Generation (OWEG) units, an experimental... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Project No. 13679-000] JD Products, LLC...
Federal Register 2010, 2011, 2012, 2013, 2014
2012-10-03
... Confidentiality: There is no assurance of confidentiality provided to respondents. Privacy Impact Assessment: No... quality, utility, and clarity of the information collected; ways to minimize the burden of the collection... INFORMATION: OMB Control Number: 3060-1033. Title: Multi-Channel Video Program Distributor EEO Program Annual...
Electric Power Quarterly, July-September 1984
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-01-01
The Electric Power Quarterly (EPQ) provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption, and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.
Electric Power Quarterly, October-December 1984
DOE Office of Scientific and Technical Information (OSTI.GOV)
Not Available
1985-04-01
The Electric Power Quarterly (EPQ) provides electric utilities' plant-level information about the cost, quantity, and quality of fossil fuel receipts, net generation, fuel consumption, and fuel stocks. The EPQ contains monthly data and quarterly totals for the reporting quarter. In this report, data collected on Form EIA-759 regarding electric utilities' net generation, fuel consumption, and fuel stocks are presented on a plant-by-plant basis. In addition, quantity, cost, and quality of fossil fuel receipts collected on the Federal Energy Regulatory Commission (FERC) Form 423 are presented on a plant-by-plant basis.
DOE Office of Scientific and Technical Information (OSTI.GOV)
Palabrica, R.J.
1981-01-01
The Philippines has a 1-MW swimming-pool reactor facility operated by the Philippine Atomic Energy Commission (PAEC). The reactor is light-water moderated and cooled, graphite reflected, and fueled with 90% enriched uranium. Since it became critical in 1963 it has been utilized for research, radioisotope production, and training. It was used initially in the training of PAEC personnel and other research institutions and universities. During the last few years, however, it has played a key role in training personnel for the Philippine Nuclear Power Project (PNPP).
25 CFR 542.9 - What are the minimum internal control standards for card games?
Code of Federal Regulations, 2013 CFR
2013-04-01
... games? 542.9 Section 542.9 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN... card games? (a) Computer applications. For any computer applications utilized, alternate documentation... and count. The procedures for the collection of the card game drop and the count thereof shall comply...
25 CFR 542.9 - What are the minimum internal control standards for card games?
Code of Federal Regulations, 2012 CFR
2012-04-01
... games? 542.9 Section 542.9 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN... card games? (a) Computer applications. For any computer applications utilized, alternate documentation... and count. The procedures for the collection of the card game drop and the count thereof shall comply...
25 CFR 542.12 - What are the minimum internal control standards for table games?
Code of Federal Regulations, 2010 CFR
2010-04-01
... games? 542.12 Section 542.12 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN... table games? (a) Computer applications. For any computer applications utilized, alternate documentation... and count. The procedures for the collection of the table game drop and the count thereof shall comply...
25 CFR 542.9 - What are the minimum internal control standards for card games?
Code of Federal Regulations, 2014 CFR
2014-04-01
... games? 542.9 Section 542.9 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN... card games? (a) Computer applications. For any computer applications utilized, alternate documentation... and count. The procedures for the collection of the card game drop and the count thereof shall comply...
25 CFR 542.12 - What are the minimum internal control standards for table games?
Code of Federal Regulations, 2014 CFR
2014-04-01
... games? 542.12 Section 542.12 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN... table games? (a) Computer applications. For any computer applications utilized, alternate documentation... and count. The procedures for the collection of the table game drop and the count thereof shall comply...
25 CFR 542.12 - What are the minimum internal control standards for table games?
Code of Federal Regulations, 2011 CFR
2011-04-01
... games? 542.12 Section 542.12 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN... table games? (a) Computer applications. For any computer applications utilized, alternate documentation... and count. The procedures for the collection of the table game drop and the count thereof shall comply...
25 CFR 542.9 - What are the minimum internal control standards for card games?
Code of Federal Regulations, 2011 CFR
2011-04-01
... games? 542.9 Section 542.9 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN... card games? (a) Computer applications. For any computer applications utilized, alternate documentation... and count. The procedures for the collection of the card game drop and the count thereof shall comply...
25 CFR 542.9 - What are the minimum internal control standards for card games?
Code of Federal Regulations, 2010 CFR
2010-04-01
... games? 542.9 Section 542.9 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN... card games? (a) Computer applications. For any computer applications utilized, alternate documentation... and count. The procedures for the collection of the card game drop and the count thereof shall comply...
25 CFR 542.12 - What are the minimum internal control standards for table games?
Code of Federal Regulations, 2012 CFR
2012-04-01
... games? 542.12 Section 542.12 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN... table games? (a) Computer applications. For any computer applications utilized, alternate documentation... and count. The procedures for the collection of the table game drop and the count thereof shall comply...
25 CFR 542.12 - What are the minimum internal control standards for table games?
Code of Federal Regulations, 2013 CFR
2013-04-01
... games? 542.12 Section 542.12 Indians NATIONAL INDIAN GAMING COMMISSION, DEPARTMENT OF THE INTERIOR HUMAN... table games? (a) Computer applications. For any computer applications utilized, alternate documentation... and count. The procedures for the collection of the table game drop and the count thereof shall comply...
Code of Federal Regulations, 2010 CFR
2010-01-01
... construction or manufacture, or any defect found in the final design of a facility as approved and released for..., combined licenses, and manufacturing licenses. 50.55 Section 50.55 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF PRODUCTION AND UTILIZATION FACILITIES Issuance, Limitations, and Conditions of...
Nevada | Midmarket Solar Policies in the United States | Solar Research |
the retail rate. RECs: Customer retain the ownership of renewable energy certificates (RECs). Meter Interconnection standards were adopted by PUCN in 2003 for customer-generators of Nevada Power and Sierra Pacific Utilities Commission of Nevada Customer-generators who do not avail renewable energy rebates from other
Federal Register 2010, 2011, 2012, 2013, 2014
2011-12-06
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. EL12-12-000] Allco Renewable Energy Limited v. Massachusetts Electric Company d/b/a National Grid; Notice of Complaint Take notice... Public Utilities Regulatory Policies Act (PURPA), Allco Renewable Energy Limited filed a formal complaint...
DGIC Interconnection Insights | Distributed Generation Interconnection
ripe for cost reductions. Utilities, public service commissions, legislators, and even developers can timelines, strand assets, stress debt service, and ultimately drive up the cost of solar energy. NREL ). The financier also indicated that solar's cost of capital, on the whole, is still 100-200 basis points
Federal Register 2010, 2011, 2012, 2013, 2014
2010-12-27
... performance of the functions of the Commission, including whether the information shall have practical utility...-of-return carriers (Interstate Common Line Support (ICLS)) to replace implicit support in interstate access charges with explicit support that is portable to all eligible telecommunications carriers. The...
10 CFR 2.627 - Partial decision on site suitability issues in combined license proceeding.
Code of Federal Regulations, 2010 CFR
2010-01-01
... license proceeding. 2.627 Section 2.627 Energy NUCLEAR REGULATORY COMMISSION RULES OF PRACTICE FOR... License To Construct Certain Utilization Facilities; and Advance Issuance of Limited Work Authorizations... accordance with this subpart. A limited work authorization may not be issued under 10 CFR 50.10(e) and no...
Capacity Reviews for Trades Training in BC
ERIC Educational Resources Information Center
Ministry of Advanced Education, 2007
2007-01-01
This report was commissioned in December 2006 to assess the capacity for trades training in the public post-secondary system with the key objectives to identify current levels of utilization for each of the top trades; identify methods of increasing capacity for top trades; and determine future levels of capacity that can be achieved without…
Federal Register 2010, 2011, 2012, 2013, 2014
2010-02-04
... Preparation of Market-Based Rate Filings and Electric Quarterly Reports by Public Utilities; Notice of Technical Conference January 28, 2010. Take notice that Commission staff will convene a technical conference... final agenda of the technical conference. The March 3, 2010 technical conference will focus on the...
Federal Register 2010, 2011, 2012, 2013, 2014
2010-06-25
... DEPARTMENT OF ENERGY Federal Energy Regulatory Commission [Docket No. AD10-13-000] Office of... traditional asset categories, and also like load. The only electricity storage technology that has been widely... assets were constructed by vertically integrated load-serving utilities at retail ratepayer expense. In...
18 CFR 292.601 - Exemption to qualifying facilities from the Federal Power Act.
Code of Federal Regulations, 2011 CFR
2011-04-01
... megawatts, if such facility uses any primary energy source other than geothermal resources. (c) General rule... FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY REGULATORY... of the Federal Power Act, except: (1) Sections 205 and 206; however, sales of energy or capacity made...
Code of Federal Regulations, 2012 CFR
2012-04-01
... functions. 366.23 Section 366.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL... or narrative description. (b) Transition period. Service companies in holding company systems...
Code of Federal Regulations, 2010 CFR
2010-04-01
... functions. 366.23 Section 366.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL... or narrative description. (b) Transition period. Service companies in holding company systems...
Code of Federal Regulations, 2011 CFR
2011-04-01
... functions. 366.23 Section 366.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL... or narrative description. (b) Transition period. Service companies in holding company systems...
Code of Federal Regulations, 2013 CFR
2013-04-01
... functions. 366.23 Section 366.23 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE PUBLIC UTILITY HOLDING COMPANY ACT OF 2005, FEDERAL... or narrative description. (b) Transition period. Service companies in holding company systems...