Sample records for vab undergoing tests

  1. Orion EFT-1 Heat Shield move from LASF to VAB for Ground Test Article Integration

    NASA Image and Video Library

    2017-04-26

    The heat shield for Exploration Flight Test-1 is transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations to be integrated with the Ground Test Article to be utilized for future Underway Recovery Testing. After transport from the Launch Abort System Facility (LASF) to the Vehicle Assembly Building (VAB), the heat shield is lifted off of the transport truck and placed onto foam pads (dunnage) for inspection in Highbay 2 of the VAB.

  2. PIONEER VENUS 2 MULTI-PROBE PARACHUTE TESTS IN THE VAB SHOWS OPEN PARACHUTE

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A parachute system, designed to carry an instrument-laden probe down through the dense atmosphere of torrid, cloud-shrouded Venus, was tested in KSC's Vehicle Assembly Building. The tests are in preparation for a Pioneer multi-probe mission to Venus scheduled for launch from KSC in 1978. Full-scale (12-foot diameter) parachutes with simulated pressure vessels weighing up to 45 pounds were dropped from heights of up to 450 feet tot he floor of the VAB where the impact was cushioned by a honeycomb cardboard impact arrestor. The VAB offers an ideal, wind-free testing facility at no additional construction cost and was used for similar tests of the parachute system for the twin Viking spacecraft scheduled for launch toward Mars in August.

  3. PIONEER VENUS 2 MULTI-PROBE PARACHUTE TESTS IN VAB WITH PARACHUTE HOISTED HIGH

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A parachute system, designed to carry an instrument-laden probe down through the dense atmosphere of torrid, cloud-shrouded Venus, was tested in KSC's Vehicle Assembly Building. The tests are in preparation for a Pioneer multi-probe mission to Venus scheduled for launch from KSC in 1978. Full-scale (12-foot diameter) parachutes with simulated pressure vessels weighing up to 45 pounds were dropped from heights of up to 450 feet tot he floor of the VAB where the impact was cushioned by a honeycomb cardboard impact arrestor. The VAB offers an ideal, wind-free testing facility at no additional construction cost and was used for similar tests of the parachute system for the twin Viking spacecraft scheduled for launch toward Mars in August.

  4. PIONEER VENUS 2 MULTI-PROBE PARACHUTE TESTS IN VAB PRIOR TO ATTACHING PRESSURE VESSEL

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A parachute system, designed to carry an instrument-laden probe down through the dense atmosphere of torrid, cloud-shrouded Venus, was tested in KSC's Vehicle Assembly Building. The tests are in preparation for a Pioneer multi-probe mission to Venus scheduled for launch from KSC in 1978. Full-scale (12-foot diameter) parachutes with simulated pressure vessels weighing up to 45 pounds were dropped from heights of up to 450 feet tot he floor of the VAB where the impact was cushioned by a honeycomb cardboard impact arrestor. The VAB offers an ideal, wind-free testing facility at no additional construction cost and was used for similar tests of the parachute system for the twin Viking spacecraft scheduled for launch toward Mars in August.

  5. VAB Sway Investigation

    NASA Technical Reports Server (NTRS)

    Youngquist, Robert c.; Ihlefeld, Curtis M.; Lane, John E.; Starr, Stanley O.

    2013-01-01

    The Vehicle Assembly Building (VAB) was constructed in the mid-1960s to house the Saturn V moon rocket while it was being assembled. Designed to withstand hurricanes and tropical storms, the V AB has a foundation consisting of 30,000 cubic yards of concrete strengthened by 4,225 steel rods driven 160 feet into limestone bedrock. The goal of the VAB Sway Investigation, which began collecting data in April 201 0 and ended in November 2012, was to quantify the displacement or sway of the VAB as a function of wind loading.

  6. View of VAB from Mobile Launcher

    NASA Image and Video Library

    2017-03-13

    A view of the north side of the Vehicle Assembly Building (VAB) from the top of the mobile launcher tower at NASA's Kennedy Space Center in Florida. Inside the VAB, 10 levels of platforms, 20 platform halves altogether, have been installed in High Bay 3. The platforms will surround NASA's Space Launch System (SLS) rocket and the Orion spacecraft and allow access during processing for missions, including the first uncrewed flight test of Orion atop the SLS rocket in 2018. Crawler-transporter 2 will carry the rocket and spacecraft atop the mobile launcher to Launch Pad 39B for Exploration Mission 1. The Ground Systems Development and Operations Program, with support from the center's Engineering Directorate, is overseeing upgrades and modifications to the VAB and the mobile launcher.

  7. Orion EFT-1 Heat Shield Move from LASF to VAB Highbay 2

    NASA Image and Video Library

    2017-04-26

    The Orion heat shield from Exploration Flight Test-1, secured on a transporter, departs the Launch Abort System Facility at NASA's Kennedy Space Center in Florida, for its move to the Vehicle Assembly Building (VAB). The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  8. Orion EFT-1 Heat Shield Move from LASF to VAB Highbay 2

    NASA Image and Video Library

    2017-04-26

    Inside the Launch Abort System Facility at NASA's Kennedy Space Center in Florida, the Orion heat shield from Exploration Flight Test-1 is being prepared for its move to the Vehicle Assembly Building (VAB). The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  9. Orion EFT-1 Heat Shield Move from LASF to VAB Highbay 2

    NASA Image and Video Library

    2017-04-26

    The Orion heat shield from Exploration Flight Test-1, secured on a transporter, arrives at the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The heat shield was moved from the Launch Abort System Facility. The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  10. Orion EFT-1 Heat Shield Move from LASF to VAB Highbay 2

    NASA Image and Video Library

    2017-04-26

    The Orion heat shield from Exploration Flight Test-1 has arrived in High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The heat shield was moved from the Launch Abort System Facility. The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  11. Orion EFT-1 Heat Shield Move from LASF to VAB Highbay 2

    NASA Image and Video Library

    2017-04-26

    Inside the Launch Abort System Facility at NASA's Kennedy Space Center in Florida, the Orion heat shield from Exploration Flight Test-1 is secured on a transporter and ready for its move to the Vehicle Assembly Building (VAB). The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  12. Orion EFT-1 Heat Shield Move from LASF to VAB Highbay 2

    NASA Image and Video Library

    2017-04-26

    Inside the Launch Abort System Facility at NASA's Kennedy Space Center in Florida, the Orion heat shield from Exploration Flight Test-1 is being loaded onto a transporter for its move to the Vehicle Assembly Building (VAB). The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  13. Orion EFT-1 Heat Shield Move from LASF to VAB Highbay 2

    NASA Image and Video Library

    2017-04-26

    Inside the Launch Abort System Facility at NASA's Kennedy Space Center in Florida, a crane lowers the Orion heat shield from Exploration Flight Test-1 onto a transporter for its move to the Vehicle Assembly Building (VAB). The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  14. Orion EFT-1 Heat Shield Move from LASF to VAB Highbay 2

    NASA Image and Video Library

    2017-04-26

    A flatbed truck carrying the Orion heat shield from Exploration Flight Test-1, backs into High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The heat shield was moved from the Launch Abort System Facility. The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  15. Orion EFT-1 Heat Shield Move from LASF to VAB Highbay 2

    NASA Image and Video Library

    2017-04-26

    A flatbed truck carrying the Orion heat shield from Exploration Flight Test-1, prepares to back into High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The heat shield was moved from the Launch Abort System Facility. The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  16. KENNEDY SPACE CENTER, FLA. - The red NASA engine hauls its cargo toward Titusville, Fla. The containers enclose segments of a solid rocket booster being returned to Utah for testing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

    NASA Image and Video Library

    2004-01-30

    KENNEDY SPACE CENTER, FLA. - The red NASA engine hauls its cargo toward Titusville, Fla. The containers enclose segments of a solid rocket booster being returned to Utah for testing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

  17. Repainting of the VAB continues

    NASA Technical Reports Server (NTRS)

    1998-01-01

    The American flag is being repainted on the side of the Vehicle Assembly Building (VAB). The flag spans an area 209 feet by 110 feet, or about 23, 437 square feet. Each stripe is 9 feet wide and each star is 6 feet in diameter. Workers, suspended on platforms from the top of the 525-foot-high VAB, are using rollers and brushes to do the painting. In addition to the flag, the NASA logo, also known as the 'meatball,' is being painted on the VAB. When finished, the logo will measure 110 feet by 132 feet, or about 12,300 square feet. The entire fleet of orbiters is also receiving the addition of the NASA logo on their wings and sidewalls. The painting honors NASA's 40th anniversary on Oct. 1 and is expected to be complete in mid-September.

  18. Repainting of the VAB continues

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Painters are dwarfed by the six-foot stars in the blue field of the American flag they are repainting on the side of the Vehicle Assembly Building (VAB). The flag spans an area 209 feet by 110 feet, or about 23, 437 square feet. Each stripe is 9 feet wide. Workers, suspended on platforms from the top of the 525-foot-high VAB, are using rollers and brushes to do the painting. In addition to the flag, the NASA logo, also known as the 'meatball,' is being painted on the VAB. When finished, the logo will measure 110 feet by 132 feet, or about 12,300 square feet. The entire fleet of orbiters is also receiving the addition of the NASA logo on their wings and sidewalls. The painting honors NASA's 40th anniversary on Oct. 1 and is expected to be complete in mid-September.

  19. Repainting of the VAB continues

    NASA Technical Reports Server (NTRS)

    1998-01-01

    The NASA logo, also known as the 'meatball,' is painted on the side of the Vehicle Assembly Building (VAB). When finished, the logo will measure 110 feet by 132 feet, or about 12,300 square feet. Workers, suspended on platforms from the top of the 525- foot-high VAB, are using rollers and brushes to do the painting. In addition to the logo, the American flag is also being repainted on the other side of the VAB. The flag spans an area 209 feet by 110 feet, or about 23, 437 square feet. Each stripe is 9 feet wide and each star is 6 feet in diameter. The entire fleet of orbiters is also receiving the addition of the NASA logo on their wings and sidewalls. The painting honors NASA's 40th anniversary on Oct. 1 and is expected to be complete in mid- September.

  20. Repainting of the VAB continues

    NASA Technical Reports Server (NTRS)

    1998-01-01

    The worker on the lower left applies the red paint to the chevron while the worker on the right fills in the blue field to the NASA logo they are painting on the Vehicle Assembly Building (VAB). When finished, the logo, also known as the 'meatball,' will measure 110 feet by 132 feet, or about 12,300 square feet. Workers, suspended on platforms from the top of the 525-foot-high VAB, are using rollers and brushes to do the painting. The entire fleet of orbiters is also receiving the addition of the NASA logo on their wings and sidewalls. In addition to the logo, the American flag is being repainted on the other side of the VAB. The flag spans an area 209 feet by 110 feet, or about 23, 437 square feet. Each stripe is 9 feet wide and each star is 6 feet in diameter. The painting honors NASA's 40th anniversary on Oct. 1 and is expected to be complete in mid-September.

  1. KENNEDY SPACE CENTER, FLA. - The red NASA engine moves forward past the Vehicle Assembly Building with its cargo of containers enclosing segments of a solid rocket booster being returned to Utah for testing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

    NASA Image and Video Library

    2004-01-30

    KENNEDY SPACE CENTER, FLA. - The red NASA engine moves forward past the Vehicle Assembly Building with its cargo of containers enclosing segments of a solid rocket booster being returned to Utah for testing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

  2. KENNEDY SPACE CENTER, FLA. - An engine pulls the container enclosing a segment of a solid rocket booster from the Rotation Processing and Surge Facility. The container will join others on the main track for a trip to Utah where the segments will undergo firing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

    NASA Image and Video Library

    2004-01-30

    KENNEDY SPACE CENTER, FLA. - An engine pulls the container enclosing a segment of a solid rocket booster from the Rotation Processing and Surge Facility. The container will join others on the main track for a trip to Utah where the segments will undergo firing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

  3. KENNEDY SPACE CENTER, FLA. - Workers ride the rails along with a container enclosing a segment of a solid rocket booster being moved to the main track. Several segments are being returned to Utah for testing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

    NASA Image and Video Library

    2004-01-30

    KENNEDY SPACE CENTER, FLA. - Workers ride the rails along with a container enclosing a segment of a solid rocket booster being moved to the main track. Several segments are being returned to Utah for testing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

  4. KENNEDY SPACE CENTER, FLA. - The red NASA engine backs up with its cargo of containers in order to change tracks. The containers enclose segments of a solid rocket booster being returned to Utah for testing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

    NASA Image and Video Library

    2004-01-30

    KENNEDY SPACE CENTER, FLA. - The red NASA engine backs up with its cargo of containers in order to change tracks. The containers enclose segments of a solid rocket booster being returned to Utah for testing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

  5. VAB Temperature and Humidity Study

    NASA Technical Reports Server (NTRS)

    Lane, John E.; Youngquist, Robert C.; Muktarian, Edward; Nurge, Mark A.

    2014-01-01

    In 2012, 17 data loggers were placed in the VAB to measure temperature and humidity at 10-minute intervals over a one-year period. In 2013, the data loggers were replaced with an upgraded model and slight adjustments to their locations were made to reduce direct solar heating effects. The data acquired by the data loggers was compared to temperature data provided by three wind towers located around the building. It was found that the VAB acts as a large thermal filter, delaying and reducing the thermal oscillations occurring outside of the building. This filtering is typically more pronounced at higher locations in the building, probably because these locations have less thermal connection with the outside. We surmise that the lower elevations respond more to outside temperature variations because of air flow through the doors. Temperatures inside the VAB rarely exceed outdoor temperatures, only doing so when measurements are made directly on a surface with connection to the outside (such as a door or wall) or when solar radiation falls directly on the sensor. A thermal model is presented to yield approximate filter response times for various locations in the building. Appendix A contains historical thermal and humidity data from 1994 to 2009.

  6. STS-98 Atlantis rolls to the VAB

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- Space Shuttle Atlantis (right) inches its way at 1 mph atop the crawler-transporter back to the Vehicle Assembly Building from Launch Pad 39A (upper left). A panorama view from the top of the VAB shows the proximity of the pad to the Atlantic Ocean (background) plus the 3.4-mile crawlerway leading from the pad to the VAB. The water areas on both sides of the crawlerway are part of the Banana River. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster'''s external system tunnel. An extensive evaluation of NASA'''s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. The launch has been rescheduled no earlier than Feb. 6.

  7. Repainting of the VAB continues

    NASA Technical Reports Server (NTRS)

    1998-01-01

    The Vehicle Assembly Building (VAB) gets a facelift with the repainting of the American flag and replacing of the bicentennial emblem with the NASA logo. The painting honors NASA's 40th anniversary on Oct. 1 and is expected to be complete in mid- September. The flag spans an area 209 feet by 110 feet, or about 23, 437 square feet. Each stripe is 9 feet wide and each star is 6 feet in diameter. The logo, also known as the 'meatball,' will measure 110 feet by 132 feet, or about 12,300 square feet. Workers, suspended on platforms from the top of the 525-foot-high VAB, are using rollers and brushes to do the painting. The entire fleet of orbiters is also receiving the addition of the NASA logo on their wings and sidewalls.

  8. Booster Engine Service Platforms Delivered to VAB

    NASA Image and Video Library

    2018-04-17

    A new service platform for NASA's Space Launch System booster engines is being prepared for the move into the Vehicle Assembly Building (VAB) at the agency's Kennedy Space Center in Florida. The platform was transported from fabricator Met-Con Inc. in Cocoa, Florida. It will be stored in the VAB, and used for processing and checkout of the engines for the rocket's twin five-segment solid rocket boosters for Exploration Mission-1. EM-1 will launch an uncrewed Orion spacecraft to a stable orbit beyond the Moon and bring it back to Earth for a splashdown in the Pacific Ocean.

  9. STS-106 orbiter Atlantis rolls over to the VAB

    NASA Technical Reports Server (NTRS)

    2000-01-01

    The orbiter Atlantis heads toward the open door of the Vehicle Assembly Building (VAB) on the north side. In the VAB it will be lifted to vertical and placed aboard the mobile launcher platform (MLP) for stacking with the solid rocket boosters and external tank. Atlantis is scheduled to launch Sept. 8 on mission STS-106, the fourth construction flight to the International Space Station, with a crew of seven.

  10. VIEW OF HB1 (VAB HIGH BAY) WITH MOBILE LAUNCHER PLATFORM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF HB-1 (VAB HIGH BAY) WITH MOBILE LAUNCHER PLATFORM (VEHICLE ACCESS PLATFORMS ARE VISIBLE IN THE CENTER), FACING WEST - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  11. Booster Engine Service Platforms Delivered to VAB

    NASA Image and Video Library

    2018-04-17

    A new service platform for NASA's Space Launch System booster engines, secured on a flatbed truck, has arrived at the Vehicle Assembly Building (VAB) at the agency's Kennedy Space Center in Florida. It was transported from fabricator Met-Con Inc. in Cocoa, Florida. The platform will be stored in the VAB and used for processing and checkout of the engines for the rocket's twin five-segment solid rocket boosters for Exploration Mission-1 (EM-1). During EM-1, an uncrewed Orion spacecraft will launch on the SLS to a stable orbit beyond the Moon and return to Earth for a splashdown in the Pacific Ocean.

  12. Booster Engine Service Platforms Delivered to VAB

    NASA Image and Video Library

    2018-04-17

    A new service platform for NASA's Space Launch System booster engines has been offloaded from a flatbed truck and is being prepared for the move into the Vehicle Assembly Building (VAB) at the agency's Kennedy Space Center in Florida. The platform was transported from fabricator Met-Con Inc. in Cocoa, Florida. It will be stored in the VAB, and used for processing and checkout of the engines for the rocket's twin five-segment solid rocket boosters for Exploration Mission-1. EM-1 will launch an uncrewed Orion spacecraft to a stable orbit beyond the Moon and bring it back to Earth for a splashdown in the Pacific Ocean.

  13. Repainting of the VAB continues

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Painters are suspended on platforms from the top of the 525-foot- high Vehicle Assembly Building (VAB) at KSC during repainting of the American flag and NASA logo. The flag spans an area 209 feet by 110 feet, or about 23,437 square feet, and will require 510 gallons of red, white and blue paint. Each stripe of the flag is 9 feet wide and each star is 6 feet in diameter. The previous Bicentennial Emblem on the right side of the VAB doors is being replaced by the NASA logo, honoring NASA's 40th anniversary (in October). The logo will cover an area 110 feet by 132 feet, or about 12,300 square feet. The painting platforms are operated by two electric motors and travel 35 feet per minute. Work is being done with rollers, with brushes being used for details. The paint was donated by ICI Devoe of Louisville, Ky. Work is expected to be completed in mid-September.

  14. Photocopy of drawing. VAB HB2 & 4 ET HOLDING CELLS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing. VAB HB-2 & 4 ET HOLDING CELLS, UPGRADE TO CHECKOUT CELLS. NASA John F. Kennedy Space Center, Florida. File Number 79K33180, Reynolds, Smith & Hill, February 1991. GENERAL ARRANGEMENT, PLAN & ELEVATIONS. Sheet 4 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  15. Photocopy of drawing. VAB HB2 & 4 ET HOLDING CELLS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing. VAB HB-2 & 4 ET HOLDING CELLS, UPGRADE TO CHECKOUT CELLS. NASA John F. Kennedy Space Center, Florida. File Number 79K33180, Reynolds, Smith & Hill, February 1991. HINGED PANEL EQUIPMENT SCHEDULE. Sheet 28 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  16. STS-106 orbiter Atlantis rolls over to the VAB

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Viewed from an upper level in the Vehicle Assembly Building (VAB), the orbiter Atlantis waits in the transfer aisle after its move from the Orbiter Processing Facility. In the VAB it will be lifted to vertical and placed aboard the mobile launcher platform (MLP) for stacking with the solid rocket boosters and external tank. Atlantis is scheduled to launch Sept. 8 on mission STS-106, the fourth construction flight to the International Space Station, with a crew of seven.

  17. Booster Engine Service Platforms Delivered to VAB

    NASA Image and Video Library

    2018-04-17

    A new service platform for NASA's Space Launch System booster engines, secured on a flatbed truck, is on its way to the Vehicle Assembly Building (VAB), in view in the distance, at the agency's Kennedy Space Center in Florida. It was transported from fabricator Met-Con Inc. in Cocoa, Florida. The platform will be delivered to the VAB, where it will be stored and used for processing and checkout of the engines for the rocket's twin five-segment solid rocket boosters for Exploration Mission-1 (EM-1). During EM-1, an uncrewed Orion spacecraft will launch on the SLS to a stable orbit beyond the Moon and return to Earth for a splashdown in the Pacific Ocean.

  18. Photocopy of drawing. VAB HB2 & 4 ET HOLDING CELLS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing. VAB HB-2 & 4 ET HOLDING CELLS, UPGRADE TO CHECKOUT CELLS. NASA John F. Kennedy Space Center, Florida. File Number 79K33180, Reynolds, Smith & Hill, February 1991. H.B.-2, PLANS AT LEVELS 4,5,&6. Sheet 7 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  19. Photocopy of drawing. VAB HB2 & 4 ET HOLDING CELLS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing. VAB HB-2 & 4 ET HOLDING CELLS, UPGRADE TO CHECKOUT CELLS. NASA John F. Kennedy Space Center, Florida. File Number 79K33180, Reynolds, Smith & Hill, February 1991. H.B.-2, PLANS AT LEVELS 1,2,&3. Sheet 6 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  20. Photocopy of drawing. VAB HB2 & 4 ET HOLDING CELLS, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing. VAB HB-2 & 4 ET HOLDING CELLS, UPGRADE TO CHECKOUT CELLS. NASA John F. Kennedy Space Center, Florida. File Number 79K33180, Reynolds, Smith & Hill, February 1991. H.B.-2, PLANS AT LEVELS 7,8,&9. Sheet 8 - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  1. STS-106 orbiter Atlantis rolls over to the VAB

    NASA Technical Reports Server (NTRS)

    2000-01-01

    KSC employees accompany the orbiter Atlantis as it is moved aboard an orbiter transporter to the Vehicle Assembly Building (VAB). In the background are OPF bays 1 and 2. In the VAB it will be lifted to vertical and placed aboard the mobile launcher platform (MLP) for stacking with the solid rocket boosters and external tank. Atlantis is scheduled to launch Sept. 8 on mission STS-106, the fourth construction flight to the International Space Station, with a crew of seven.

  2. Repainting of the VAB nearly finished

    NASA Technical Reports Server (NTRS)

    1998-01-01

    This aerial view shows the Vehicle Assembly Building (VAB) getting a facelift with the repainting of the American flag and replacing of the Bicentennial emblem with the NASA logo. The painting honors NASA's 40th anniversary on Oct. 1 and is expected to be complete in mid-September. The flag spans an area 209 feet by 110 feet, or about 23, 437 square feet. Each stripe is 9 feet wide and each star is 6 feet in diameter. The logo, also known as the 'meatball,' measures 110 feet by 132 feet, or about 12,300 square feet. Workers, suspended on platforms from the top of the 525-foot-high VAB, are using rollers and brushes to do the painting. The entire fleet of orbiters is also receiving the addition of the NASA logo on their wings and sidewalls.

  3. Repainting of the VAB nearly finished

    NASA Technical Reports Server (NTRS)

    1998-01-01

    This aerial view shows the Vehicle Assembly Building (VAB) getting a facelift with the repainting of the American flag and replacing of the bicentennial emblem with the NASA logo. The painting honors NASA's 40th anniversary on Oct. 1 and is expected to be complete in mid-September. The flag spans an area 209 feet by 110 feet, or about 23, 437 square feet. Each stripe is 9 feet wide and each star is 6 feet in diameter. The logo, also known as the 'meatball,' measures 110 feet by 132 feet, or about 12,300 square feet. Workers, suspended on platforms from the top of the 525-foot-high VAB, are using rollers and brushes to do the painting. The entire fleet of orbiters is also receiving the addition of the NASA logo on their wings and sidewalls.

  4. STS-106 orbiter Atlantis rolls over to the VAB

    NASA Technical Reports Server (NTRS)

    2000-01-01

    The orbiter Atlantis is moved aboard an orbiter transporter from the Orbiter Processing Facility (OPF) bay 3 over to the Vehicle Assembly Building (VAB). In the background (right) are OPF bays 1 and 2. In the VAB it will be lifted to vertical and placed aboard the mobile launcher platform (MLP) for stacking with the solid rocket boosters and external tank. Atlantis is scheduled to launch Sept. 8 on mission STS-106, the fourth construction flight to the International Space Station, with a crew of seven.

  5. STS-79 Rolls over from OPF to VAB

    NASA Technical Reports Server (NTRS)

    1996-01-01

    A vantage point high atop the Vehicle Assembly Building (VAB) shrinks the size and scale of the orbiter Atlantis as it is rolled from the Orbiter Processing Facility to the VAB. During the five working days it spends inside the huge building, Atlantis will be mated to the external tank/twin solid rocket booster assembly, and then rolled out to Launch Pad 39A. Here, the SPACEHAB Double Module will be installed in the orbiter's payload bay and final launch preparations will get underway. Atlantis is scheduled for liftoff on Mission STS-79 , the fourth docking with the Russian Space Station Mir, scheduled for July 31.

  6. VAB Flag Painting

    NASA Image and Video Library

    2002-01-01

    On platforms suspended from the top of the 525-foot-high VAB, workers use rollers and brushes to repaint the U.S. flag on the southwest side of the Vehicle Assembly Building. The flag spans an area 209 feet by 110 feet, or about 23, 437 square feet. Each stripe is 9 feet wide and each star is 6 feet in diameter. The logo is also being painted. Known as the "meatball," the logo measures 110 feet by 132 feet, or about 12,300 square feet. The flag and logo were last painted in 1998, honoring NASA's 40th anniversary.

  7. VAB Flag Painting

    NASA Image and Video Library

    2002-01-01

    On platforms suspended from the top of the 525-foot-high VAB, workers use rollers and brushes to repaint the NASA logo on the southeast side of the Vehicle Assembly Building. Known as the "meatball," the logo measures 110 feet by 132 feet, or about 12,300 square feet. The U.S. flag is also being repainted. The flag spans an area 209 feet by 110 feet, or about 23, 437 square feet. Each stripe is 9 feet wide and each star is 6 feet in diameter. The flag and logo were last painted in 1998, honoring NASA's 40th anniversary.

  8. Workers in the VAB move sling into place to lift Columbia to mobile launcher

    NASA Technical Reports Server (NTRS)

    1982-01-01

    Workers in the Vehicle Assembly Building (VAB) move a specially-built sling into place to lift Orbiter Columbia from the transfer aisle to the mobile launcher platform (27015); Columbia is lifted from the floor of the VAB transfer aisle (27016).

  9. KSC VAB Aeroacoustic Hazard Assessment

    DTIC Science & Technology

    2010-07-01

    a Mobile Launch Platform (MLP). Several platform levels are used to perform processing operations and will too be reused and/or modified. Each HB is...I/V Flight Vehicles and the VAB The shell is made up of hundreds of aluminum “punch-out” panels which are designed to fail above approximately 100...into several slices which are converted to monopole sources (see figure below). Figure 3: Plume conversion into acoustic sources [2] The

  10. STS-79 Atlantis rolls back to the VAB at sunrise

    NASA Technical Reports Server (NTRS)

    1996-01-01

    As the sun begins to rise in the early-morning sky, the Space Shuttle Atlantis slowly travels on the Crawlerway toward the Vehicle Assembly Building (VAB) after its departure from Launch Pad 39A. This marks the second rollback for Atlantis since July because of hurricane threats. Atlantis, which is targeted for liftoff later this month on the STS-79 Shuttle mission, is returning to the VAB because of the threat from Hurricane Fran. The threat of Hurricane Bertha forced the rollback of Atlantis in July. Atlantis currently is scheduled for launch on the fourth Shuttle-Mir docking mission around mid-September.

  11. 32 CFR 728.52 - Veterans Administration beneficiaries (VAB).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 32 National Defense 5 2012-07-01 2012-07-01 false Veterans Administration beneficiaries (VAB). 728.52 Section 728.52 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL MEDICAL AND DENTAL CARE FOR ELIGIBLE PERSONS AT NAVY MEDICAL DEPARTMENT FACILITIES Beneficiaries of Other...

  12. 32 CFR 728.52 - Veterans Administration beneficiaries (VAB).

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 5 2011-07-01 2011-07-01 false Veterans Administration beneficiaries (VAB). 728.52 Section 728.52 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL MEDICAL AND DENTAL CARE FOR ELIGIBLE PERSONS AT NAVY MEDICAL DEPARTMENT FACILITIES Beneficiaries of Other...

  13. 32 CFR 728.52 - Veterans Administration beneficiaries (VAB).

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 32 National Defense 5 2010-07-01 2010-07-01 false Veterans Administration beneficiaries (VAB). 728.52 Section 728.52 National Defense Department of Defense (Continued) DEPARTMENT OF THE NAVY PERSONNEL MEDICAL AND DENTAL CARE FOR ELIGIBLE PERSONS AT NAVY MEDICAL DEPARTMENT FACILITIES Beneficiaries of Other...

  14. KENNEDY SPACE CENTER, FLA. - The external tank in the Vehicle Assembly Building (VAB) is destacked from the solid rocket boosters. The tank and SRBs were configured for Atlantis and mission STS-114. The tank will remain in the VAB.

    NASA Image and Video Library

    2003-05-20

    KENNEDY SPACE CENTER, FLA. - The external tank in the Vehicle Assembly Building (VAB) is destacked from the solid rocket boosters. The tank and SRBs were configured for Atlantis and mission STS-114. The tank will remain in the VAB.

  15. The American flag on the VAB is being repainted

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Painters are suspended on platforms from the top of the 525-foot- high Vehicle Assembly Building (VAB) at KSC during repainting of the American flag. The flag spans an area 209 feet by 110 feet and will require 510 gallons of red, white and blue paint. Each stripe of the flag is 9 feet wide and each star is 6 feet in diameter. The platforms are operated by two electric motors and travel 35 feet per minute. Work is being done with rollers, with brushes being used for details. The paint was donated by ICI Devoe of Louisville, Ky. In addition to the flag, the Bicentennial Emblem on the other side of the VAB doors is being replaced by the NASA logo, honoring NASA's 40th anniversary (in October). The logo covers an area 110 feet by 132 feet. Work is expected to be completed in mid-September.

  16. The American flag on the VAB is being repainted

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Painters are suspended on platforms from the top of the 525-foot- high Vehicle Assembly Building (VAB) at KSC during repainting of the American flag and NASA logo. The flag spans an area 209 feet by 110 feet and will require 510 gallons of red, white and blue paint. Each stripe of the flag is 9 feet wide and each star is 6 feet in diameter. The previous Bicentennial Emblem on the other side of the VAB doors is being replaced by the NASA logo, honoring NASA's 40th anniversary (in October). The logo covers an area 110 feet by 132 feet. The painting platforms are operated by two electric motors and travel 35 feet per minute. Work is being done with rollers, with brushes being used for details. The paint was donated by ICI Devoe of Louisville, Ky. Work is expected to be completed in mid-September.

  17. STS-51 preparation: ACTS, ORFEUS, Discovery in VAB

    NASA Technical Reports Server (NTRS)

    1993-01-01

    In NASA's building AM on Cape Canaveral Air Force Station, STS-51 mission specialist Carl Walz (right) and Deutsche Aerospace technician Gregor Dawidowitsch check over the scientific instruments mounted on the Shuttle Pallet Satellite (SPAS) carrier (38573); The Orbiting and Retrievable Far and Extreme Ultraviolet Spectrometer (ORFEUS) and SPAS is readied for hoisting into a test cell at the Vertical Processing Facility (VPF) (38574); Mating of the Advanced Communications Technology Satellite (ACTS) with the Transfer Orbit Stage (TOS) booster is under way in the Payload Hazardous Servicing Facility (PHSF) (38575); The mated ACTS and TOS are ready to be moved from the PHSF to the Vertical Processsing Facility (VPF) (38576); The orbiter Discovery is rolled into the Vehicle Assembly Building (VAB) for mating with the external tank and twin solid rocket boosters (38577-8).

  18. An external tank is moved from a barge in the turn basin to the VAB

    NASA Technical Reports Server (NTRS)

    2000-01-01

    A newly arrived external tank is transported from the turn basin to the Vehicle Assembly Building (VAB), seen behind the tank. External tanks are built by the NASA Michoud Assembly Facility in New Orleans and transported by barge to Cape Canaveral and then up the Banana River to the turn basin in the Launch Complex 39 Area. In the VAB, the tank will await stacking for a future Shuttle mission.

  19. An external tank is moved from a barge in the turn basin to the VAB

    NASA Technical Reports Server (NTRS)

    2000-01-01

    A newly arrived external tank heads from the turn basin toward the Vehicle Assembly Building (VAB), seen behind the tank. External tanks are built by the NASA Michoud Assembly Facility in New Orleans and transported by barge to Cape Canaveral and then up the Banana River to the turn basin in the Launch Complex 39 Area. In the VAB, the tank will await stacking for a future Shuttle mission.

  20. KSC VAB Aeroacoustic Hazard Assessment

    NASA Technical Reports Server (NTRS)

    Oliveira, Justin M.; Yedo, Sabrina; Campbell, Michael D.; Atkinson, Joseph P.

    2010-01-01

    NASA Kennedy Space Center (KSC) carried out an analysis of the effects of aeroacoustics produced by stationary solid rocket motors in processing areas at KSC. In the current paper, attention is directed toward the acoustic effects of a motor burning within the Vehicle Assembly Building (VAB). The analysis was carried out with support from ASRC Aerospace who modeled transmission effects into surrounding facilities. Calculations were done using semi-analytical models for both aeroacoustics and transmission. From the results it was concluded that acoustic hazards in proximity to the source of ignition and plume can be severe; acoustic hazards in the far-field are significantly lower.

  1. Analysis of a Hypergolic Propellant Explosion During Processing of Launch Vehicles in the VAB

    NASA Technical Reports Server (NTRS)

    Chrostowski, Jon D.; Gan Wenshui; Campbell, Michael D.

    2010-01-01

    NASA is developing launch vehicles to support missions to Low Earth Orbit (LEO), the moon and deep space. Whether manned or unmanned, the vehicle components will likely be integrated in the Vehicle Assembly Building (VAB) at Kennedy Space Center (KSC) and typically include a fueled spacecraft (SC) that sits on top of one or more stages. The processing of a fueled SC involves hazardous operations when it is brought into the VAB Transfer Aisle and lifted a significant height for mating with lower stages. Accidents resulting from these hazardous operations could impact unrelated personnel working in buildings adjacent to the VAB. Safe separation distances based on the DOD Explosives Standards Quantity-Distance (Q-D) approach result in large IBD arcs. This paper presents site-specific air blast and fragmentation hazard analyses for comparison with the Q-D arcs as well as consequence and risk analyses to provide added information for the decision maker. A new physics-based fragmentation model is presented that includes: a) the development of a primary fragment list (which defines the fragment characteristics) associated with a hypergolic propellant explosion, b) a description of a 3D fragment bounce model, c) the results of probabilistic Monte-Carlo simulations (that include uncertainties in the fragment characteristics) to determine: i) the hazardous fragment density distance, ii) the expected number of wall/roof impacts and penetrations to over 40 buildings adjacent to the VAB, and iii) the risk to building occupants.

  2. STS-83 Columbia Rollout to PAD-39A (fish eye view in VAB)

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The Space Shuttle Orbiter Columbia begins its rollout from the Vehicle Assembly Building (VAB) to Launch Pad 39A in preparation for the STS-83 mission. The Microgravity Science Laboratory-1 (MSL-1) Spacelab module is the primary payload on this 16-day space flight. The MSL-1 will be used to test some of the hardware, facilities and procedures that are planned for use on the International Space Station while the seven-member flight crew conducts combustion, protein crystal growth and materials processing experiments.

  3. Atlantis returns to VAB after beginning rollout to the pad

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- Scattered clouds cast shadows as Space Shuttle Atlantis crawls back inside the Vehicle Assembly Building high bay 1. After earlier starting its trek to Launch Pad 39B, Atlantis was returned to the VAB due to lightning in the area. To the left of the VAB is the Launch Control Center. The four-story building houses the firing rooms that are used to conduct Space Shuttle launches. Leading away from the VAB, in the foreground, is the crawlerway, the 130-foot-wide road specially constructed to transport the Shuttle, mobile launcher platform and crawler-transporter with a combined weight of about 17 million pounds. Space Shuttle Atlantis is targeted for launch no earlier than July 12 on mission STS-104, the 10th flight to the International Space Station. The payload on the 11-day mission is the Joint Airlock Module, which will allow astronauts and cosmonauts in residence on the Station to perform future spacewalks without the presence of a Space Shuttle. The module, which comprises a crew lock and an equipment lock, will be connected to the starboard (right) side of Node 1 Unity. Atlantis will also carry oxygen and nitrogen storage tanks, vital to operation of the Joint Airlock, on a Spacelab Logistics Double Pallet in the payload bay. The tanks, to be installed on the perimeter of the Joint Module during the missions spacewalks, will support future spacewalk operations and experiments plus augment the resupply system for the Stations Service Module.

  4. Interdisciplinary consensus on the uses and technique of MR-guided vacuum-assisted breast biopsy (VAB): results of a European consensus meeting.

    PubMed

    Heywang-Köbrunner, Sylvia H; Sinnatamby, Ruchi; Lebeau, Annette; Lebrecht, Antje; Britton, Peter D; Schreer, Ingrid

    2009-11-01

    Quality assurance of MR-guided vacuum-assisted breast biopsy (VAB). A consensus was achieved based on the existing literature and experience of an interdisciplinary group comprising European specialists in breast imaging and VAB. Full imaging work-up must be completed according to existing standards before an indication for MR-guided VAB is established. The procedure should be reserved for lesions demonstrable by MRI alone. Acquisition of >24 cores (11-Gauge) should be routinely attempted, with the intention of sufficiently removing small lesions for accurate diagnosis. Following biopsy the patient should be re-imaged to demonstrate the biopsy site and its proximity to the lesion and hence the likely accuracy of the sampling. All patients should be discussed in a regular interdisciplinary conference and a documented consensus reached regarding patient management. Regular audit and review of all MR-guided VAB results and subsequent follow-up are recommended. This consensus includes protocols for the indication, performance parameters, interdisciplinary interpretation therapeutic recommendation, documentation and follow-up of MR-guided VAB. It does not replace official recommendations for percutaneous biopsy.

  5. Engineering Management Board tour Vehicle Assembly Building (VAB)

    NASA Image and Video Library

    2017-03-22

    All the heads of engineering from across the country come together at KSC for a bi-annual face to face meeting to discuss roles, progress and capabilities. The two day meeting helps to ensure a unified focus in all engineering endevours, especially those that involve intercenter collaboration such as upcoming launch of SLS and Orion. The group toured level 1 and 28 of highbay 3 of the VAB on Wednesday, March 22 to look over the newly installed platforms.

  6. Aerial of the VAB

    NASA Technical Reports Server (NTRS)

    2000-01-01

    In the early morning, flocks of birds soar over the Banana River, whose waters reflect the Vehicle Assembly Building , bathed in a pink glow from post-dawn light. Next to the VAB, on the left, is the Launch Control Center. The rectangular building closer to the water at left is the Operations Support Building. At right is the Rotation/Processing Facility. The birds are a common sight at KSC since the Center shares a boundary with the Merritt Island National Wildlife Refuge. The Refuge encompasses 92,000 acres that are a habitat for more than 331 species of birds, 31 mammals, 117 fishes, and 65 amphibians and reptiles. The marshes and open water of the refuge provide wintering areas for 23 species of migratory waterfowl, as well as a year-round home for great blue herons, great egrets, wood storks, cormorants, brown pelicans and other species of marsh and shore birds, as well as a variety of insects.

  7. STS-106 orbiter Atlantis rolls over to the VAB

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Inside the Vehicle Assembly Building (VAB), overhead cranes move above the orbiter Atlantis in order to lift it to vertical. When vertical, the orbiter will be placed aboard the mobile launcher platform (MLP) for stacking with the solid rocket boosters and external tank. Atlantis is scheduled to launch Sept. 8 on mission STS-106, the fourth construction flight to the International Space Station, with a crew of seven.

  8. STS-35 Columbia, OV-102, rolls back to KSC VAB after hydrogen leak discovered

    NASA Image and Video Library

    1990-06-12

    S90-42289 ( 3 July 1990) --- Kennedy Space Center (KSC) workers watch as Columbia, Orbiter Vehicle (OV) 102, along with its external tank (ET) and two solid rocket boosters (SRBs) atop the giant crawler transporter, rolls back to KSC's Vehicle Assembly Building (VAB). The rollback was caused by a hydrogen leak that stopped the STS-35 countdown during ET fueling, 05-29-90. Once in the VAB, OV-102 and its stack will be demated, and OV-102, with its Astronomy Laboratory 1 (ASTRO-1) payload aboard, will be moved to the Orbiter Processing Facility (OPF) to await return to KSC Launch Complex (LC) Pad 39A. View provided by KSC with alternate number KSC-90PC-901.

  9. Atlantis begins rolling back to the VAB

    NASA Technical Reports Server (NTRS)

    2001-01-01

    Perched atop its Mobile Launcher Platform, Space Shuttle Atlantis moves back to the Vehicle Assembly Building, via the crawler- transporter underneath, along the crawlerway. The water in the background is part of the Banana River. Atlantis' return to the VAB was determined by Shuttle managers so that inspections, continuity checks and X-ray analysis can be conducted on the 36 solid rocket booster cables located inside each booster's system tunnel. An extensive evaluation of NASA's SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. The launch has been rescheduled no earlier than Feb. 6.

  10. Apollo spacecraft Command/Service Module and Lunar Module 3 arrive at VAB

    NASA Image and Video Library

    1968-12-03

    Apollo Spacecraft 104 Command/Service Module and Lunar Module 3 arrive at the Vehicle Assembly Building (VAB) for mating atop the Saturn 504 launch vehicle. The Saturn 504 stack is out of view. The Saturn V first (S-IC) stage in left background is scheduled for a later flight.

  11. APOLLO 4 SATURN V LAUNCH VEHICLE MATING INSIDE VEHICLE ASSEMBLY BUILDING [VAB

    NASA Technical Reports Server (NTRS)

    1967-01-01

    The S II stage of the Apollo/Saturn 501 launch vehicle is being mated to the first stage at the Vehicle Assembly Building [VAB] in preparation for the National Aeronautics and Space Administration's first Saturn V mission. The mission will be unmanned and is scheduled early this year.

  12. Recommendations for Safe Separation Distances from the Kennedy Space Center (KSC) Vehicle Assembly Building (VAB) Using a Heat-Flux-Based Analytical Approach (Abridged)

    NASA Technical Reports Server (NTRS)

    Cragg, Clinton H.; Bowman, Howard; Wilson, John E.

    2011-01-01

    The NASA Engineering and Safety Center (NESC) was requested to provide computational modeling to support the establishment of a safe separation distance surrounding the Kennedy Space Center (KSC) Vehicle Assembly Building (VAB). The two major objectives of the study were 1) establish a methodology based on thermal flux to determine safe separation distances from the Kennedy Space Center's (KSC's) Vehicle Assembly Building (VAB) with large numbers of solid propellant boosters containing hazard division 1.3 classification propellants, in case of inadvertent ignition; and 2) apply this methodology to the consideration of housing eight 5-segment solid propellant boosters in the VAB. The results of the study are contained in this report.

  13. KENNEDY SPACE CENTER, FLA. - The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, away from the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-17

    KENNEDY SPACE CENTER, FLA. - The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, away from the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  14. KENNEDY SPACE CENTER, FLA. - The crawler transporter has slowly moved the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, out of the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-17

    KENNEDY SPACE CENTER, FLA. - The crawler transporter has slowly moved the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, out of the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  15. KENNEDY SPACE CENTER, FLA. - The crawler transporter is slowly moving the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, out of the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-17

    KENNEDY SPACE CENTER, FLA. - The crawler transporter is slowly moving the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, out of the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  16. KENNEDY SPACE CENTER, FLA. - The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, out of the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-17

    KENNEDY SPACE CENTER, FLA. - The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, out of the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  17. KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, inch away from the Vehicle Assembly Building (VAB) in support of the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-21

    KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, inch away from the Vehicle Assembly Building (VAB) in support of the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  18. Regulation of Gap Junction Dynamics by UNC-44/ankyrin and UNC-33/CRMP through VAB-8 in C. elegans Neurons

    PubMed Central

    Yan, Dong

    2016-01-01

    Gap junctions are present in both vertebrates and invertebrates from nematodes to mammals. Although the importance of gap junctions has been documented in many biological processes, the molecular mechanisms underlying gap junction dynamics remain unclear. Here, using the C. elegans PLM neurons as a model, we show that UNC-44/ankyrin acts upstream of UNC-33/CRMP in regulation of a potential kinesin VAB-8 to control gap junction dynamics, and loss-of-function in the UNC-44/UNC-33/VAB-8 pathway suppresses the turnover of gap junction channels. Therefore, we first show a signal pathway including ankyrin, CRMP, and kinesin in regulating gap junctions. PMID:27015090

  19. Workers painting the Flag and Meatball on the VAB

    NASA Image and Video Library

    2007-01-03

    Elevated platforms are seen hanging on the side of Kennedy Space Center's Vehicle Assembly Building in a view looking across from the turn basin. To the right is the large external tank barge. Workers, suspended on the platforms from the top of the 525-foot-high VAB, use rollers and brushes to do the painting. The flag and logo were last painted in 1998, honoring NASA's 40th anniversary. The flag spans an area 209 feet by 110 feet, or about 23, 437 square feet. Each stripe is 9 feet wide and each star is 6 feet in diameter. The logo, also known as the "meatball," measures 110 feet by 132 feet, or about 12,300 square feet.

  20. [Evaluation of psychological fear in children undergoing head-up tilt test].

    PubMed

    Chu, Wei-Hong; Wu, Li-Jia; Wang, Cheng; Lin, Ping; Li, Fang; Zhu, Li-Ping; Ran, Jing; Zou, Run-Mei; Liu, De-Yu

    2014-03-01

    To investigate the effects of different tilt angles of head-up tilt test (HUTT) and different responses to HUTT on the psychological fear in children undergoing the test. HUTT was performed on children with unexplained syncope or pre-syncope (107 cases: 52 males and 55 females), aged 5.5-17.8 years (mean 12.0±2.8 years). All subjects were randomly assigned to undergo HUTT at an angle of 60°, 70° or 80°; the negative cases underwent sublingual nitroglycerin-provocation HUTT at the same tilt angle. The Wong-Baker Faces Pain Rating Scale was used for self-assessment of psychological fear in subjects during HUTT at the end point of the test. The positive rate, hemodynamic changes and distribution of response types showed no significant differences between children at tilt angles of 60°, 70° and 80° (P>0.05). The greater the tilt angle, the higher the degree of psychological fear in children undergoing the test, but there were no significant differences between them (P>0.05). The degree of psychological fear in children who showed a positive response to HUTT (n=76) was significantly higher than that in children who showed a negative response (n=31) (P<0.01). HUTT can cause psychological fear in children undergoing the test, and the degree of psychological fear increases in children tested at tilt angles from 60° to 80°, but the differences have no statistical significance. A positive response to HUTT can significantly increase the psychological fear in children.

  1. Role of genetic testing in patients undergoing percutaneous coronary intervention.

    PubMed

    Moon, Jae Youn; Franchi, Francesco; Rollini, Fabiana; Rivas Rios, Jose R; Kureti, Megha; Cavallari, Larisa H; Angiolillo, Dominick J

    2018-02-01

    Variability in individual response profiles to antiplatelet therapy, in particular clopidogrel, is a well-established phenomenon. Genetic variations of the cytochrome P450 (CYP) 2C19 enzyme, a key determinant in clopidogrel metabolism, have been associated with clopidogrel response profiles. Moreover, the presence of a CYP2C19 loss-of-function allele is associated with an increased risk of atherothrombotic events among clopidogrel-treated patients undergoing percutaneous coronary interventions (PCI), prompting studies evaluating the use of genetic tests to identify patients who may be potential candidates for alternative platelet P2Y 12 receptor inhibiting therapies (prasugrel or ticagrelor). Areas covered: The present manuscript provides an overview of genetic factors associated with response profiles to platelet P2Y 12 receptor inhibitors and their clinical implications, as well as the most recent developments and future considerations on the role of genetic testing in patients undergoing PCI. Expert commentary: The availability of more user-friendly genetic tests has contributed towards the development of many ongoing clinical trials and personalized medicine programs for patients undergoing PCI. Results of pilot investigations have shown promising results, which however need to be confirmed in larger-scale studies to support the routine use of genetic testing as a strategy to personalize antiplatelet therapy and improve clinical outcomes.

  2. KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, crawl out of the Vehicle Assembly Building (VAB) in support of the second engineering analysis vibration test on the crawler and MLP. In the background is another MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-21

    KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, crawl out of the Vehicle Assembly Building (VAB) in support of the second engineering analysis vibration test on the crawler and MLP. In the background is another MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  3. KENNEDY SPACE CENTER, FLA. - The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, away from the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. On either side of the boosters on the horizon can be seen the two launch pads. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-17

    KENNEDY SPACE CENTER, FLA. - The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, away from the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. On either side of the boosters on the horizon can be seen the two launch pads. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  4. Workers painting the Flag and Meatball on the VAB

    NASA Image and Video Library

    2007-01-03

    Elevated platforms are seen hanging in front of the NASA Logo on the side of Kennedy Space Center's Vehicle Assembly Building. Also in view on the east side of the building are platforms on the facility's large vertical doors. Workers, suspended on the platforms from the top of the 525-foot-high VAB, use rollers and brushes to do the painting. The flag and logo were last painted in 1998, honoring NASA's 40th anniversary. The flag spans an area 209 feet by 110 feet, or about 23, 437 square feet. Each stripe is 9 feet wide and each star is 6 feet in diameter. The logo, also known as the "meatball," measures 110 feet by 132 feet, or about 12,300 square feet.

  5. Role of Genetic Testing in Patients undergoing Percutaneous Coronary Intervention

    PubMed Central

    Moon, Jae Youn; Franchi, Francesco; Rollini, Fabiana; Rios, Jose R. Rivas; Kureti, Megha; Cavallari, Larisa H.; Angiolillo, Dominick J.

    2017-01-01

    Introduction Variability in individual response profiles to antiplatelet therapy, in particular clopidogrel, is a well-established phenomenon. Genetic variations of the cytochrome P450 (CYP) 2C19 enzyme, a key determinant in clopidogrel metabolism, have been associated with clopidogrel response profiles. Moreover, the presence of a CYP2C19 loss-of-function allele is associated with an increased risk of atherothrombotic events among clopidogrel-treated patients undergoing percutaneous coronary interventions (PCI), prompting studies evaluating the use of genetic tests to identify patients who may be potential candidates for alternative platelet P2Y12 receptor inhibiting therapies (prasugrel or ticagrelor). Areas covered The present manuscript provides an overview of genetic factors associated with response profiles to platelet P2Y12 receptor inhibitors and their clinical implications, as well as the most recent developments and future considerations on the role of genetic testing in patients undergoing PCI. Expert Commentary The availability of more user-friendly genetic tests has contributed towards the development of many ongoing clinical trials and personalized medicine programs for patients undergoing PCI. Results of pilot investigations have shown promising results, which however need to be confirmed in larger-scale studies to support the routine use of genetic testing as a strategy to personalize antiplatelet therapy and improve clinical outcomes. PMID:28689434

  6. Willingness to undergo HIV testing in the Kintampo districts of Ghana.

    PubMed

    Abokyi, L V; Zandoh, C; Mahama, E; Sulemana, A; Adda, R; Amenga-Etego, S; Baiden, F; Owusu-Agyei, S

    2014-03-01

    HIV testing is currently a major prevention intervention and remains an entry point to early treatment, care and support. Uptake is however low and alternative approaches are currently being adopted. An HIV module was incorporated into the routine survey of the Kintampo Health and Demographic Surveillance System (KHDSS) to assess the willingness of adults living in the Kintampo North and South districts to undergo HIV testing. The study was a descriptive cross-sectional household survey. Univariate and multivariate analysis were used to identify predictors of the willingness to undergo HIV testing. Respondents were community members aged 15 to 49 years and selected from randomly generated household listings from the KHDSS. A total of 11,604 respondents were interviewed, 10,982 (94.6%) of respondents had good general knowledge on HIV/AIDS. Among those with knowledge about HIV/AIDS, 10,819 (98.5%) indicated their willingness to get tested for HIV. Rural residents were more willing to undergo HIV testing than urban dwellers Odds ratio=1.42 (95% Confidence interval: 1.03, 1.96; P-value=0.031). Respondents with primary education were more likely to go for testing relative to those without any education OR=2.02 (95% CI: 0.87, 4.70; P-value=0.046). Expressed willingness to test for HIV is high in this population. Exploring community and population-based interventions to HIV testing and counseling could increase uptake of HIV testing services and should be considered. The underlying motivations need to be explored in order to translate willingness into actual testing.

  7. VAB Platform K(2) Lift & Install into Highbay 3

    NASA Image and Video Library

    2016-03-07

    A 250-ton crane is used to lower the second half of the K-level work platforms for NASA’s Space Launch System (SLS) rocket into High Bay 3 inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The platform will be secured about 86 feet above the VAB floor, on tower E of the high bay. The K work platforms will provide access to the SLS core stage and solid rocket boosters during processing and stacking operations on the mobile launcher. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft.

  8. Ground level view of Apollo 14 space vehicle leaving VAB for launch pad

    NASA Image and Video Library

    1970-11-09

    S70-54121 (9 Nov. 1970) --- A ground level view at Launch Complex 39, Kennedy Space Center (KSC), showing the Apollo 14 (Spacecraft 110/Lunar Module 8/Saturn 509) space vehicle leaving the Vehicle Assembly Building (VAB). The Saturn V stack and its mobile launch tower, atop a huge crawler-transporter, were rolled out to Pad A. The Apollo 14 crewmen will be astronauts Alan B. Shepard Jr., commander; Stuart A. Roosa, command module pilot; and Edgar D. Mitchell, lunar module pilot.

  9. [Diagnosis of flat epithelial atypia (FEA) after stereotactic vacuum-assisted biopsy (VAB) of the breast: What is the best management: systematic surgery for all or follow-up?].

    PubMed

    David, N; Labbe-Devilliers, C; Moreau, D; Loussouarn, D; Campion, L

    2006-11-01

    FEA lesions group two histological types: columnar cell hyperplasia with atypia (CCHA) and columnar cell change with atypia (CCA). The increasing use of VAB has resulted in increased detection of isolated FEA lesions. The aim of this study was to define the best management possible for these patients: which cases may not need excision? From our database of 780 VABs carried out from 2000 to 2004, 59 patients with FEA were diagnosed. Cases in which no surgery was performed or all features were not available were excluded, thus excluding 19 cases. Forty patients with FEA were included. We reviewed clinical and mammographic characteristics, histological biopsy, and the corresponding surgically excised tissue features. VAB yielded 25 cases of CCHA and 15 cases of CCA. Surgery revealed seven ductal carcinoma cases (four invasive, three in situ); nine benign lesions, and 24 with atypia (19 FEA and six atypical ductal hyperplasia). We found two features related to the risk of cancer: the presence and the size of hyperplasia. All carcinomas were found within the CCHA lesions. No cancer was yielded when size was less than 10 mm within CCA lesions and lesions that were totally removed. We recommend surgical excision when CCHA greater than 10 mm is found on the VAB or it is incompletely removed. CCA lesions or CCHA less than 10 mm or totally removed may obviate systematic surgery.

  10. KENNEDY SPACE CENTER, FLA. - The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, away from the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. In the distance, at left, is Launch Pad 39A. The water on the right of the crawlerway is the Banana River. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-17

    KENNEDY SPACE CENTER, FLA. - The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, away from the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. In the distance, at left, is Launch Pad 39A. The water on the right of the crawlerway is the Banana River. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  11. STS-103 Discovery rolls over to VAB

    NASA Technical Reports Server (NTRS)

    1999-01-01

    The orbiter Discovery sits inside the Vehicle Assembly Building (VAB) after its rollover from the Orbiter Processing Facility (OPF) bay rocket boosters for its launch on mission STS-103. The launch date is currently under review for early December. STS-103, the third Hubble Space Telescope servicing mission, is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode.

  12. VAB Platform K(2) Lift & Install into Highbay 3

    NASA Image and Video Library

    2016-03-07

    Preparations are underway to lift the second half of the K-level work platforms for NASA’s Space Launch System (SLS) rocket up from High Bay 4 inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The platform will be lifted up and over the transfer aisle and then lowered into High Bay 3 for installation. It will be secured about 86 feet above the VAB floor, on tower E of the high bay. The K work platforms will provide access to the SLS core stage and solid rocket boosters during processing and stacking operations on the mobile launcher. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft.

  13. VAB Platform K(2) Lift & Install into Highbay 3

    NASA Image and Video Library

    2016-03-07

    A 250-ton crane is used to lift the second half of the K-level work platforms for NASA’s Space Launch System (SLS) rocket high above the transfer aisle inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The platform is being lifted up for transfer into High Bay 3 for installation. The platform will be secured about 86 feet above the VAB floor, on tower E of the high bay. The K work platforms will provide access to the SLS core stage and solid rocket boosters during processing and stacking operations on the mobile launcher. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft.

  14. VAB Platform K(2) Lift & Install into Highbay 3

    NASA Image and Video Library

    2016-03-07

    A 250-ton crane is used to lift the second half of the K-level work platforms for NASA’s Space Launch System (SLS) rocket up from High Bay 4 inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The platform will be lifted up and over the transfer aisle and then lowered into High Bay 3 for installation. It will be secured about 86 feet above the VAB floor, on tower E of the high bay. The K work platforms will provide access to the SLS core stage and solid rocket boosters during processing and stacking operations on the mobile launcher. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft.

  15. VAB Platform K(2) Lift & Install into Highbay 3

    NASA Image and Video Library

    2016-03-07

    A 250-ton crane is used to lift the second half of the K-level work platforms for NASA’s Space Launch System (SLS) rocket up from High Bay 4 inside the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida. The platform is being lifted up and over the transfer aisle and will be lowered into High Bay 3 for installation. It will be secured about 86 feet above the VAB floor, on tower E of the high bay. The K work platforms will provide access to the SLS core stage and solid rocket boosters during processing and stacking operations on the mobile launcher. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft.

  16. PIONEER VENUS 2 MULTI-PROBE PARACHUTE TESTS IN THE VEHICLE ASSEMBLY BUILDING

    NASA Technical Reports Server (NTRS)

    1975-01-01

    A parachute system, designed to carry an instrument-laden probe down through the dense atmosphere of torrid, cloud-shrouded Venus, was tested in KSC's Vehicle Assembly Building. The tests are in preparation for a Pioneer multi-probe mission to Venus scheduled for launch from KSC in 1978. Full-scale (12-foot diameter) parachutes with simulated pressure vessels weighing up to 45 pounds were dropped from heights of up to 450 feet tot he floor of the VAB where the impact was cushioned by a honeycomb cardboard impact arrestor. The VAB offers an ideal, wind-free testing facility at no additional construction cost and was used for similar tests of the parachute system for the twin Viking spacecraft scheduled for launch toward Mars in August.

  17. STS-103 Discovery rolls over to VAB

    NASA Technical Reports Server (NTRS)

    1999-01-01

    After making a turn in front of the Orbiter Processing Facility (OPF) bay 1, the orbiter Discovery begins moving along the tow-way to the Vehicle Assembly Building as KSC workers watch. At the VAB, Discovery will be mated with an external tank and solid rocket boosters for its launch on mission STS-103. The launch date is currently under review for early December. STS-103, the third Hubble Space Telescope servicing mission, is a 'call-up' due to the need to replace portions of the pointing system, the gyros, which have begun to fail on the Hubble Space Telescope. Although Hubble is operating normally and conducting its scientific observations, only three of its six gyroscopes are working properly. The gyroscopes allow the telescope to point at stars, galaxies and planets. The STS-103 crew will also be replacing a Fine Guidance Sensor and an older computer with a new enhanced model, an older data tape recorder with a solid-state digital recorder, a failed spare transmitter with a new one, and degraded insulation on the telescope with new thermal insulation. The crew will also install a Battery Voltage/Temperature Improvement Kit to protect the spacecraft batteries from overcharging and overheating when the telescope goes into a safe mode.

  18. KENNEDY SPACE CENTER, FLA. - Viewed across the turn basin in the Launch Complex 39 Area, the crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, away from the Vehicle Assembly Building (VAB). The journey is in support of engineering analysis vibration tests on the crawler and MLP. The water on the right of the crawlerway is the Banana River. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-17

    KENNEDY SPACE CENTER, FLA. - Viewed across the turn basin in the Launch Complex 39 Area, the crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, away from the Vehicle Assembly Building (VAB). The journey is in support of engineering analysis vibration tests on the crawler and MLP. The water on the right of the crawlerway is the Banana River. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  19. Understanding of multigene test results among males undergoing germline testing for inherited prostate cancer: Implications for genetic counseling.

    PubMed

    Giri, Veda N; Obeid, Elias; Hegarty, Sarah E; Gross, Laura; Bealin, Lisa; Hyatt, Colette; Fang, Carolyn Y; Leader, Amy

    2018-04-14

    Genetic testing (GT) for prostate cancer (PCA) is rising, with limited insights regarding genetic counseling (GC) needs of males. Genetic Evaluation of Men (GEM) is a prospective multigene testing study for inherited PCA. Men undergoing GC were surveyed on knowledge of cancer risk and genetics (CRG) and understanding of personal GT results to identify GC needs. GEM participants with or high-risk for PCA were recruited. Pre-test GC was in-person, with video and handout, or via telehealth. Post-test disclosure was in-person, by phone, or via telehealth. Clinical and family history data were obtained from participant surveys and medical records. Participants completed measures of knowledge of CRG, literacy, and numeracy pre-test and post-test. Understanding of personal genetic results was assessed post-test. Factors associated with knowledge of CRG and understanding of personal genetic results were examined using multivariable linear regression or McNemar's test. Among 109 men who completed pre- and post-GT surveys, multivariable analysis revealed family history meeting hereditary cancer syndrome (HCS) criteria was significantly predictive of higher baseline knowledge (P = 0.040). Of 101 men who responded definitively regarding understanding of results, 13 incorrectly reported their result (McNemar's P < 0.001). Factors significantly associated with discordance between reported and actual results included having a variant of uncertain significance (VUS) (P < 0.001) and undergoing GC via pre-test video and post-test phone disclosure (P = 0.015). While meeting criteria for HCS was associated with higher knowledge of CRG, understanding of personal GT results was lacking among a subset of males with VUS. A more exploratory finding was lack of understanding of results among men who underwent GC utilizing video and phone. Studies optimizing GC strategies for males undergoing multigene testing for inherited PCA are warranted. © 2018 Wiley Periodicals, Inc.

  20. KENNEDY SPACE CENTER, FLA. - Flatbed trucks carrying some of the debris of Space Shuttle Columbia approach the Vehicle Assembly Building (VAB). The debris is being transferred from the Columbia Debris Hangar to the VAB for permanent storage. More than 83,000 pieces of debris were shipped to KSC during search and recovery efforts in East Texas. That represents about 38 percent of the dry weight of Columbia, equaling almost 85,000 pounds.

    NASA Image and Video Library

    2003-09-15

    KENNEDY SPACE CENTER, FLA. - Flatbed trucks carrying some of the debris of Space Shuttle Columbia approach the Vehicle Assembly Building (VAB). The debris is being transferred from the Columbia Debris Hangar to the VAB for permanent storage. More than 83,000 pieces of debris were shipped to KSC during search and recovery efforts in East Texas. That represents about 38 percent of the dry weight of Columbia, equaling almost 85,000 pounds.

  1. KENNEDY SPACE CENTER, FLA. - Pieces of Columbia debris are offloaded from a flatbed truck in the transfer aisle of the Vehicle Assembly Building (VAB). The debris is being moved from the Columbia Debris Hangar to the VAB for permanent storage. More than 83,000 pieces of debris were shipped to KSC during search and recovery efforts in East Texas. That represents about 38 percent of the dry weight of Columbia, equaling almost 85,000 pounds.

    NASA Image and Video Library

    2003-09-15

    KENNEDY SPACE CENTER, FLA. - Pieces of Columbia debris are offloaded from a flatbed truck in the transfer aisle of the Vehicle Assembly Building (VAB). The debris is being moved from the Columbia Debris Hangar to the VAB for permanent storage. More than 83,000 pieces of debris were shipped to KSC during search and recovery efforts in East Texas. That represents about 38 percent of the dry weight of Columbia, equaling almost 85,000 pounds.

  2. KENNEDY SPACE CENTER, FLA. - A worker moves some of the Columbia debris to its storage site in the Vehicle Assembly Building (VAB). The debris is being transferred from the Columbia Debris Hangar to the VAB for permanent storage. More than 83,000 pieces of debris were shipped to KSC during search and recovery efforts in East Texas. That represents about 38 percent of the dry weight of Columbia, equaling almost 85,000 pounds.

    NASA Image and Video Library

    2003-09-15

    KENNEDY SPACE CENTER, FLA. - A worker moves some of the Columbia debris to its storage site in the Vehicle Assembly Building (VAB). The debris is being transferred from the Columbia Debris Hangar to the VAB for permanent storage. More than 83,000 pieces of debris were shipped to KSC during search and recovery efforts in East Texas. That represents about 38 percent of the dry weight of Columbia, equaling almost 85,000 pounds.

  3. KENNEDY SPACE CENTER, FLA. - Workers move some of the Columbia debris to its storage site in the Vehicle Assembly Building (VAB). The debris is being transferred from the Columbia Debris Hangar to the VAB for permanent storage. More than 83,000 pieces of debris were shipped to KSC during search and recovery efforts in East Texas. That represents about 38 percent of the dry weight of Columbia, equaling almost 85,000 pounds.

    NASA Image and Video Library

    2003-09-15

    KENNEDY SPACE CENTER, FLA. - Workers move some of the Columbia debris to its storage site in the Vehicle Assembly Building (VAB). The debris is being transferred from the Columbia Debris Hangar to the VAB for permanent storage. More than 83,000 pieces of debris were shipped to KSC during search and recovery efforts in East Texas. That represents about 38 percent of the dry weight of Columbia, equaling almost 85,000 pounds.

  4. STS-79 Atlantis approaches the VAB (view from inside VAB)

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The Space Shuttle Atlantis begins its move into the Vehicle Assembly Building for shelter from the effects of Hurricane Fran. Atlantis is completing its rollback from Launch Pad 39A, where it was undergoing preparations for Mission STS-79. This marks the second rollback for Atlantis since July because of hurricane threats. The threat of Hurricane Bertha forced the rollback of Atlantis in July. Atlantis currently is scheduled for launch on the fourth Shuttle-Mir docking mission around mid-September.

  5. Awareness of Pap testing and factors associated with intent to undergo Pap testing by level of sexual experience in unmarried university students in Korea: results from an online survey

    PubMed Central

    2014-01-01

    Background Young and unmarried women have not been a target group for cervical cancer prevention in Korea. No previous studies have investigated the awareness of Pap testing, the intention to undergo Pap testing, or the factors associated with that intention, in this group of women. This information would be useful for an expansion in the focus of primary cervical cancer prevention. This study aimed to compare the awareness of Pap testing between groups of unmarried university students in Korea, and to investigate the factors associated with the intention to undergo Pap testing, by level of sexual experience. Methods A total of 475 unmarried university students who had never undergone a Pap test completed a web-based survey. Differences in awareness of the importance of the Pap test, confidence in Pap testing, intention to undergo the test, attitudes, subjective norms, perceived control, stigma, and shame by level of sexual experience were analysed using independent t-tests. Associations between measurement variables and intention to undergo Pap testing were analysed using correlation analysis. Variables yielding significant associations (p < 0.05) were included in a stepwise multiple regression model of intention to undergo Pap testing. Results Most participants perceived that the need for regular Pap testing was less important (score, 77.76) than other methods of cervical cancer prevention. They were not confident that is was an effective method of cervical cancer prevention for themselves (score, 59.56). There were differences in confidence in Pap testing and in the factors associated with intention to undergo Pap testing between sexually experienced and sexually inexperienced students. Regardless of level of sexual experience, the subjective norm was the most important predictor of intention to undergo Pap testing. Conclusions There was a low level of Pap screening awareness among the students. The factors associated with intention to undergo Pap testing

  6. Mars Polar Lander undergoes testing in SAEF-2

    NASA Technical Reports Server (NTRS)

    1998-01-01

    In the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2), KSC technicians lower the Mars Polar Lander onto a workstand. The spacecraft is undergoing testing of science instruments and basic spacecraft subsystems. The solar-powered spacecraft, targeted for launch from Cape Canaveral Air Station aboard a Delta II rocket on Jan. 3, 1999, is designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The Lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere.

  7. Mars Polar Lander undergoes testing in SAEF-2

    NASA Technical Reports Server (NTRS)

    1998-01-01

    In the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2), KSC technicians look over the Mars Polar Lander. The spacecraft is undergoing testing of science instruments and basic spacecraft subsystems. Targeted for launch from Cape Canaveral Air Station aboard a Delta II rocket on Jan. 3, 1999, the solar-powered spacecraft is designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The Lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere.

  8. KENNEDY SPACE CENTER, FLA. - Pieces of debris of Space Shuttle Columbia are offloaded from a flatbed truck in the transfer aisle of the Vehicle Assembly Building (VAB). The debris is being moved from the Columbia Debris Hangar to the VAB for permanent storage. More than 83,000 pieces of debris were shipped to KSC during search and recovery efforts in East Texas. That represents about 38 percent of the dry weight of Columbia, equaling almost 85,000 pounds.

    NASA Image and Video Library

    2003-09-15

    KENNEDY SPACE CENTER, FLA. - Pieces of debris of Space Shuttle Columbia are offloaded from a flatbed truck in the transfer aisle of the Vehicle Assembly Building (VAB). The debris is being moved from the Columbia Debris Hangar to the VAB for permanent storage. More than 83,000 pieces of debris were shipped to KSC during search and recovery efforts in East Texas. That represents about 38 percent of the dry weight of Columbia, equaling almost 85,000 pounds.

  9. Apollo/Saturn V facilities Test Vehicle and Launch Umbilical Tower

    NASA Image and Video Library

    1966-05-25

    An Apollo/Saturn V facilities Test Vehicle and Launch Umbilical Tower (LUT) atop a crawler-transporter move from the Vehicle Assembly Building (VAB) on the way to Pad A. This test vehicle, designated the Apollo/Saturn 500-F, is being used to verify launch facilities, train launch crews, and develop test and checkout procedures.

  10. Mars Polar Lander undergoes testing in SAEF-2

    NASA Technical Reports Server (NTRS)

    1998-01-01

    In the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2), KSC technicians check underneath the Mars Polar Lander as it sits on a workstand. The spacecraft is undergoing testing of science instruments and basic spacecraft subsystems. The solar-powered spacecraft, targeted for launch from Cape Canaveral Air Station aboard a Delta II rocket on Jan. 3, 1999, is designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere.

  11. DETAIL VIEW OF ELECTRONICS TEST AREA, FLIGHT KITS FACILITY, ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF ELECTRONICS TEST AREA, FLIGHT KITS FACILITY, ROOM NO. 1N12, FACING WEST - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  12. DETAIL VIEW OF TESTING EQUIPMENT, REMOTE MANIPULATOR SYSTEM LAB, ROOM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    DETAIL VIEW OF TESTING EQUIPMENT, REMOTE MANIPULATOR SYSTEM LAB, ROOM NO. 1N4, FACING SOUTHEAST - Cape Canaveral Air Force Station, Launch Complex 39, Vehicle Assembly Building, VAB Road, East of Kennedy Parkway North, Cape Canaveral, Brevard County, FL

  13. Multiple Testing, Cumulative Radiation Dose, and Clinical Indications in Patients Undergoing Myocardial Perfusion Imaging

    PubMed Central

    Einstein, Andrew J.; Weiner, Shepard D.; Bernheim, Adam; Kulon, Michal; Bokhari, Sabahat; Johnson, Lynne L.; Moses, Jeffrey W.; Balter, Stephen

    2013-01-01

    Context Myocardial perfusion imaging (MPI) is the single medical test with the highest radiation burden to the US population. While many patients undergoing MPI receive repeat MPI testing, or additional procedures involving ionizing radiation, no data are available characterizing their total longitudinal radiation burden and relating radiation burden with reasons for testing. Objective To characterize procedure counts, cumulative estimated effective doses of radiation, and clinical indications, for patients undergoing MPI. Design, Setting, Patients Retrospective cohort study evaluating, for 1097 consecutive patients undergoing index MPI during the first 100 days of 2006 at Columbia University Medical Center, all preceding medical imaging procedures involving ionizing radiation undergone beginning October 1988, and all subsequent procedures through June 2008, at that center. Main Outcome Measures Cumulative estimated effective dose of radiation, number of procedures involving radiation, and indications for testing. Results Patients underwent a median (interquartile range, mean) of 15 (6–32, 23.9) procedures involving radiation exposure; 4 (2–8, 6.5) were high-dose (≥3 mSv, i.e. one year's background radiation), including 1 (1–2, 1.8) MPI studies per patient. 31% of patients received cumulative estimated effective dose from all medical sources >100mSv. Multiple MPIs were performed in 39% of patients, for whom cumulative estimated effective dose was 121 (81–189, 149) mSv. Men and whites had higher cumulative estimated effective doses, and there was a trend towards men being more likely to undergo multiple MPIs than women (40.8% vs. 36.6%, Odds ratio 1.29, 95% confidence interval 0.98–1.69). Over 80% of initial and 90% of repeat MPI exams were performed in patients with known cardiac disease or symptoms consistent with it. Conclusion In this institution, multiple testing with MPI was very common, and in many patients associated with very high cumulative

  14. KSC-2011-6400

    NASA Image and Video Library

    2011-08-11

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttles Discovery and Endeavour, their noses encased in protective plastic where their forward reaction control systems (FRCS) once resided, pause outside Orbiter Processing Facility-3 (OPF-3) for a unique photo opportunity. Discovery, which temporarily was being stored in the Vehicle Assembly Building (VAB), is switching places with Endeavour, which has been undergoing decommissioning in OPF-1. Discovery then will be rolled into OPF-1 and Endeavour into the VAB. In OPF-1, Discovery will undergo further preparations for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. Endeavour will be stored in the VAB until October when it will be moved into OPF-2 for further work to get it ready for public display at the California Science Center in Los Angeles. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Jim Grossmann

  15. KENNEDY SPACE CENTER, FLA. -- Endeavour settles into place inside the Vehicle Assembly Building (VAB) where it has been moved for temporary storage. It left the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- Endeavour settles into place inside the Vehicle Assembly Building (VAB) where it has been moved for temporary storage. It left the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  16. KENNEDY SPACE CENTER, FLA. -- Endeavour rolls into the Vehicle Assembly Building (VAB) for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- Endeavour rolls into the Vehicle Assembly Building (VAB) for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  17. The STS-93 external tank and booster stack sits at the Mobile Launcher Platform park site

    NASA Technical Reports Server (NTRS)

    1999-01-01

    The STS-93 stack of solid rocket boosters and external tank sits at the Mobile Launcher Platform park site waiting for lightning shield wires to be installed on the Vehicle Assembly Building (VAB) in the background. The stack is being temporarily stored outside the VAB while Space Shuttle Discovery undergoes repair to hail damage in High Bay 1. Discovery was rolled back from Pad 39B to the VAB for repairs because access to all of the damaged areas was not possible at the pad. The STS-93 stack will be moved under the wires at the VAB for protection until Discovery returns to the pad, later this week. The scheduled date for launch of mission STS-96 is no earlier than May 27. STS-93 is targeted for launch on July 22, carrying the Chandra X-ray Observatory.

  18. Space Shuttle Atlantis rolls back to Launch Pad 39A

    NASA Technical Reports Server (NTRS)

    2001-01-01

    Photographed from the top of the Vehicle Assembly Building, Space Shuttle Atlantis creeps along the crawlerway for the 3.4-mile trek to Launch Pad 39A (upper left). In the background is the Atlantic Ocean; on either side is water from the Banana Creek (left) and Banana River (right). The Shuttle has been in the VAB undergoing tests on the solid rocket booster cables. A prior extensive evaluation of NASA's SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis, causing return of the Shuttle to the VAB a week ago. Launch of Atlantis on STS-98 has been rescheduled to Feb. 7 at 6:11 p.m. EST.

  19. View of Apollo 15 space vehicle leaving VAB to Pad A, Launch Complex 39

    NASA Image and Video Library

    1971-05-11

    S71-33786 (11 May 1971) --- The 363-feet tall Apollo (Spacecraft 112/Lunar Module 10/Saturn 510) space vehicle which leaves the Vehicle Assembly Building (VAB) to Pad A, Launch Complex 39, Kennedy Space Center (KSC). The Saturn V stack and its mobile launch tower are atop a huge crawler-transporter. Apollo 15 is scheduled as the fourth manned lunar landing mission by the National Aeronautics and Space Administration (NASA) and is scheduled to lift off on July 26, 1971. The crew men will be astronauts David R. Scott, commander; Alfred M. Worden, command module pilot; and James B. Irwin, lunar module pilot. While astronaut Scott and Irwin will descend in the Lunar Module (LM) to explore the moon, astronaut Worden will remain with the Command and Service Modules (CSM) in lunar orbit.

  20. KSC-04PD-0136

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. An engine pulls the container enclosing a segment of a solid rocket booster from the Rotation Processing and Surge Facility. The container will join others on the main track for a trip to Utah where the segments will undergo firing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

  1. KSC-98pc1166

    NASA Image and Video Library

    1998-09-28

    The orbiter Atlantis, being towed from the Shuttle Landing Facility toward the Vehicle Assembly Building (VAB) , intersects the morning sun's rays. In the background, to the right of the VAB, are the Orbiter Processing Facility 1 and 2. Atlantis spent 10 months in Palmdale, CA, undergoing extensive inspections and modifications in the orbiter processing facility there. The modifications included several upgrades enabling it to support International Space Station missions, such as adding an external airlock for ISS docking missions and installing thinner, lighter thermal protection blankets for weight reduction which will allow it to haul heavier cargo. Atlantis will undergo preparations at KSC in Orbiter Processing Facility 2 for its planned flight in June 1999

  2. Factors influencing behavioral intention to undergo Papanicolaou testing in early adulthood: Comparison of Japanese and Korean women.

    PubMed

    Kang, Kyung-Ah; Kim, Shin-Jeong; Kaneko, Noriyo

    2017-12-01

    In this study, we identified the factors influencing behavioral intention to undergo Papanicolaou testing among Japanese and Korean women in early adulthood. Their behavioral intentions were compared in this cross-sectional descriptive study. In total, 887 women (Japanese = 498, Korean = 389) aged 20-39 years participated in this study. Using a self-report questionnaire, knowledge, attitudes, subjective norm, perceived behavioral control, and behavioral intention were surveyed. There were significant differences between Japanese and Korean women's scores on all main variables. For Japanese women, all the variables moderately correlated with behavioral intention. In comparison, for Korean women, all independent variables, except for knowledge, moderately correlated with behavioral intention. Through a multiple regression analysis, age, undergoing Papanicolaou testing, attitudes, subjective norm, and perceived behavioral control were identified as significant predictors of behavioral intention among Japanese women. Among Korean women, job status, undergoing a Papanicolaou test, attitudes, subjective norm, and perceived behavioral control were demonstrated as significant predictors of behavioral intention. Health professionals should consider these factors to encourage Papanicolaou testing in women in early adulthood. © 2017 John Wiley & Sons Australia, Ltd.

  3. KENNEDY SPACE CENTER, FLA. -- Endeavour is towed in front of the Vehicle Assembly Building (VAB) where it is going for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- Endeavour is towed in front of the Vehicle Assembly Building (VAB) where it is going for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  4. KSC-2011-6381

    NASA Image and Video Library

    2011-08-11

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, operators begin to move space shuttle Endeavour, its nose encased in protective plastic where its forward reaction control system (FRCS) once resided, from Orbiter Processing Facility-1 (OPF-1) to the Vehicle Assembly Building (VAB). Endeavour is switching places with shuttle Discovery which temporarily has been stored in the VAB. Both shuttles will stop briefly outside OPF-3 for a "nose-to-nose" photo opportunity. Discovery then will be rolled into OPF-1 and Endeavour into the VAB. In OPF-1, Discovery will undergo further preparations for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. Endeavour will be stored in the VAB until October when it will be moved into OPF-2 for further work to get it ready for public display at the California Science Center in Los Angeles. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Jim Grossmann

  5. KSC-2011-6388

    NASA Image and Video Library

    2011-08-11

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Endeavour, its nose encased in protective plastic where its forward reaction control system (FRCS) once resided, backs out of Orbiter Processing Facility-1 (OPF-1) for its move to the Vehicle Assembly Building (VAB). Endeavour is switching places with shuttle Discovery which temporarily has been stored in the VAB. Both shuttles will stop briefly outside OPF-3 for a "nose-to-nose" photo opportunity. Discovery then will be rolled into OPF-1 and Endeavour into the VAB. In OPF-1, Discovery will undergo further preparations for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. Endeavour will be stored in the VAB until October when it will be moved into OPF-2 for further work to get it ready for public display at the California Science Center in Los Angeles. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Jim Grossmann

  6. KSC-2011-6387

    NASA Image and Video Library

    2011-08-11

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Endeavour, its nose encased in protective plastic where its forward reaction control system (FRCS) once resided, is towed out of Orbiter Processing Facility-1 (OPF-1) for its move to the Vehicle Assembly Building (VAB). Endeavour is switching places with shuttle Discovery which temporarily has been stored in the VAB. Both shuttles will stop briefly outside OPF-3 for a "nose-to-nose" photo opportunity. Discovery then will be rolled into OPF-1 and Endeavour into the VAB. In OPF-1, Discovery will undergo further preparations for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. Endeavour will be stored in the VAB until October when it will be moved into OPF-2 for further work to get it ready for public display at the California Science Center in Los Angeles. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Jim Grossmann

  7. View of Apollo 15 space vehicle on way from VAB to Pad A, Launch Complex 39

    NASA Image and Video Library

    1971-05-11

    S71-33781 (11 May 1971) --- High angle view showing the Apollo 15 (Spacecraft 112/Lunar Module 10/Saturn 510) space vehicle on the way from the Vehicle Assembly Building (VAB) to Pad A, Launch Complex 39, Kennedy Space Center (KSC). The Saturn V stack and its mobile launch tower are atop a huge crawler-transporter. Apollo 15 is scheduled as the fourth manned lunar landing mission by the National Aeronautics and Space Administration (NASA). The crew men will be astronauts David R. Scott, commander; Alfred M. Worden, command module pilot; and James B. Irwin, lunar module pilot. While astronauts Scott and Irwin descend in the Lunar Module (LM) to explore the moon, astronaut Worden will remain with the Command and Service Modules (CSM) in lunar orbit.

  8. STS-95 Discovery undergoes vertical lift in the VAB

    NASA Technical Reports Server (NTRS)

    1998-01-01

    In the Vehicle Assembly Building, the orbiter Discovery is fully vertical, after being lifted into position for mating with the external tank. The orbiter displays the recently painted NASA logo, termed the 'meatball,' on its left, or port, wing. The logo also has been painted on both sides of the aft fuselage. Discovery (OV-103), the first of the orbiters to be launched with the new art work, is scheduled for its 25th flight, from Launch Pad 39B, on Oct. 29, 1998, for the STS-95 mission.

  9. STS-95 Discovery undergoes vertical lift in the VAB

    NASA Technical Reports Server (NTRS)

    1998-01-01

    In the Vehicle Assembly Building, the orbiter Discovery (viewed from behind the Space Shuttle Main Engines) is raised to a vertical position in order to be mated with the external tank. The orbiter displays the recently painted NASA logo, termed the 'meatball,' on its left, or port, wing. The logo also has been painted on both sides of the aft fuselage. Discovery (OV-103), the first of the orbiters to be launched with the new art work, is scheduled for its 25th flight, from Launch Pad 39B, on Oct. 29, 1998, for the STS-95 mission.

  10. STS-95 Discovery undergoes vertical lift in the VAB

    NASA Technical Reports Server (NTRS)

    1998-01-01

    In the Vehicle Assembly Building, the orbiter Discovery (viewed from behind the Space Shuttle Main Engines, port side) is raised to a vertical position in order to be mated with the external tank. The orbiter displays the recently painted NASA logo, termed the 'meatball,' on its left, or port, wing. The logo also has been painted on both sides of the aft fuselage. Discovery (OV- 103), the first of the orbiters to be launched with the new art work, is scheduled for its 25th flight, from Launch Pad 39B, on Oct. 29, 1998, for the STS-95 mission.

  11. STS-95 Discovery undergoes vertical lift in the VAB

    NASA Technical Reports Server (NTRS)

    1998-01-01

    In the Vehicle Assembly Building, the orbiter Discovery (viewed from below the Space Shuttle Main Engines, starboard side) is raised to a vertical position in order to be mated with the external tank. The orbiter displays the recently painted NASA logo, termed the 'meatball,' on the aft fuselage. The logo also has been painted on the left, or port, wing. Discovery (OV-103), the first of the orbiters to be launched with the new art work, is scheduled for its 25th flight, from Launch Pad 39B, on Oct. 29, 1998, for the STS-95 mission.

  12. KENNEDY SPACE CENTER, FLA. -- After Endeavour’s rollout from inside the Orbiter Processing Facility, the transporter (foreground) prepares to tow it to the Vehicle Assembly Building for temporary transfer. A protective cover surrounds the nose of Endeavour. The move to the VAB allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- After Endeavour’s rollout from inside the Orbiter Processing Facility, the transporter (foreground) prepares to tow it to the Vehicle Assembly Building for temporary transfer. A protective cover surrounds the nose of Endeavour. The move to the VAB allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  13. KSC-04PD-0139

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. The red NASA engine backs up with its cargo of containers in order to change tracks. The containers enclose segments of a solid rocket booster being returned to Utah for testing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

  14. KSC-04PD-0137

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. Workers ride the rails along with a container enclosing a segment of a solid rocket booster being moved to the main track. Several segments are being returned to Utah for testing. The segments were part of the STS-114 stack. It is the first time actual flight segments that had been stacked for flight in the VAB are being returned for testing. They will undergo firing, which will enable inspectors to check the viability of the solid and verify the life expectancy for stacked segments.

  15. Influence of family history on the willingness of outpatients to undergo genetic testing for salt-sensitive hypertension: a cross-sectional study.

    PubMed

    Takeshima, Taro; Okayama, Masanobu; Ae, Ryusuke; Harada, Masanori; Kajii, Eiji

    2017-07-17

    It is unclear whether family medical history influences the willingness to undergo genetic testing. This study aimed to determine how family history affected the willingness to undergo genetic testing for salt-sensitive hypertension in patients with and without hypertension. Cross-sectional study using a self-administered questionnaire. Six primary care clinics and hospitals in Japan. Consecutive 1705 outpatients aged >20 years, 578 of whom had hypertension. The primary outcome variable was the willingness to undergo genetic testing to determine the risk of salt-sensitive hypertension, and the secondary variables were age, sex, education level, family history and concerns about hypertension. Factors associated with a willingness to undergo genetic testing were evaluated in patients with and without hypertension using a logistic regression model. In the hypertension and non-hypertension groups, 323 (55.9%) and 509 patients (45.2%), respectively, were willing to undergo genetic testing. This willingness was related with a high level of education (adjusted OR (ad-OR): 1.81, 95% CI 1.12 to 2.93), family history of stroke (1.55, 1.04 to 2.31) and concerns about hypertension (2.04, 1.27 to 3.28) in the hypertension group, whereas in the non-hypertension group, it was influenced by education level (ad-OR: 1.45, 95% CI 1.13 to 1.86), family history of hypertension (1.52, 1.17 to 1.98) and concerns about hypertension (2.03, 1.53 to 2.68). The influence of family history on the willingness to undergo genetic testing for risk of salt-sensitivity hypertension differed between participants with and without hypertension. In particular, participants without hypertension wished to know their likelihood of developing hypertension, whereas those with hypertension were interested to know the risk of stroke (a complication of hypertension). Family history could help better counsel patients about genetic testing on the basis of their medical history. © Article author(s) (or their

  16. A pretest prognostic score to assess patients undergoing exercise or pharmacological stress testing.

    PubMed

    Morise, Anthony; Evans, Matthew; Jalisi, Farrukh; Shetty, Rajendra; Stauffer, Marc

    2007-02-01

    A previously developed pretest score was validated to stratify patients presenting for exercise testing with suspected coronary disease according to the presence of angiographic coronary disease. Our goal was to determine how well this pretest score risk stratified patients undergoing pharmacological and exercise stress tests concerning prognostic endpoints. Retrospective cohort analysis. University hospital stress laboratory. 7452 unselected ambulatory patients with symptoms of suspected coronary disease undergoing stress testing between 1995 and 2004. All-cause death, cardiac death and non-fatal myocardial infarction. The rate of all-cause death was 5.5% (CI 5.0 to 6.1) with 4.3 (SD 2.4) years of follow-up (Exercise 2.8% (CI 2.3 to 3.2) v Pharmacological group 11.9% (CI 10.5 to 13.3); p<0.001). The rate of cardiac death/myocardial infarction was 2.6% (CI 2.2 to 3.0) (Exercise 1.4% (CI 1.1 to 1.8) v Pharmacological group 5.3% (CI 4.3 to 6.2); p<0.001). In both groups, stratification by pretest score was significant for all-cause death and the combined endpoint. However, stratification was more effective in the pharmacological group using the combined endpoint rather than all-cause death. Pharmacological stress patients in intermediate and high risk groups were at higher risk than their respective exercise test cohorts. Referral for pharmacological stress testing was found to be an independent predictor of time to death (2.7 (CI 2.0 to 3.6); p<0.001). A pretest score previously validated to stratify according to angiographic outcomes, effectively risk stratified pharmacological and exercise stress patients according to the combined endpoint of cardiac death/myocardial infarction.

  17. Risk profile and HIV testing outcomes of women undergoing community-based testing in San Diego 2008-2014.

    PubMed

    Graves, Susannah K; Little, Susan J; Hoenigl, Martin

    2017-02-06

    Women comprised 19% of new HIV diagnoses in the United States in 2014, with significant racial and ethnic disparities in infection rates. This cross-sectional analysis of women enrolled in a cohort study compares demographics, risk behaviour, and sexually transmitted infections (STI) in those undergoing HIV testing in San Diego County. Data from the most recent screening visit of women undergoing voluntary HIV screening April 2008 -July 2014 was used. HIV diagnosis, risk behaviour and self-reported STIs were compared among women aged ≤24, 25-49, and ≥50, as well as between HIV-infected and uninfected women and between Hispanic and non-Hispanic women. Among the 2535 women included, Hispanic women were less likely than other women to report unprotected vaginal intercourse (p = 0.026) or stimulant drug use (p = 0.026), and more likely to report one or fewer partners (p < 0.0001), but also more likely to report sex with an HIV-infected individual (p = 0.027). New HIV infection was significantly more prevalent among Hispanic women (1.6% vs. 0.2%; p < 0.001). Hispanic women were more likely than other women to be diagnosed with HIV despite significantly lower rates of risk behaviour. Culturally specific risk reduction interventions for Hispanic women should focus on awareness of partner risk and appropriate testing.

  18. Awareness of dysgeusia and gustatory tests in patients undergoing chemotherapy for breast cancer.

    PubMed

    Kuba, Sayaka; Fujiyama, Rie; Yamanouchi, Kosho; Morita, Michi; Sakimura, Chika; Hatachi, Toshiko; Matsumoto, Megumi; Yano, Hiroshi; Takatsuki, Mitsuhisa; Hayashida, Naomi; Nagayasu, Takeshi; Eguchi, Susumu

    2018-05-12

    We analyzed the prevalence of gustatory test abnormalities in breast cancer (BC) patients undergoing chemotherapy. We enrolled 43 BC patients undergoing chemotherapy and 38 BC patients who had never undergone chemotherapy (control group). Two gustatory tests were conducted: an instillation method examining the threshold for four basic taste stimuli and an electrogustometry method measuring the threshold for perception with electric stimulation at the front two-thirds of the tongue (cranial nerve VII) and at the back third of the tongue (cranial nerve IX). The results of the two gustatory tests and clinicopathological factors were compared between the chemotherapy and control groups and between patients with and without awareness of dysgeusia in the chemotherapy group. In the chemotherapy group, 19 (44%) patients were aware of dysgeusia and 8 (19%) had hypogeusia using the instillation method. Although more patients had parageusia in the chemotherapy than control group, no significant differences in the results of the two gustatory tests were observed. Patients with dysgeusia awareness had a higher threshold at cranial nerve IX using the electrogustometry method than those without dysgeusia awareness; no significant differences in hypogeusia were observed using the instillation method. In fact, 74% (14/19) of patients with dysgeusia awareness could identify the four tastes accurately using the instillation method. Similar results were observed for the instillation and electrogustometry methods at cranial nerve VII. While approximately half of the chemotherapy patients were aware of dysgeusia, 81% (35/43) of them could accurately identify the four basic tastes using the instillation method.

  19. Norms for developmental milestones using VABS-II and association with anthropometric measures among apparently healthy urban Indian preschool children.

    PubMed

    Selvam, Sumithra; Thomas, Tinku; Shetty, Priya; Zhu, Jianjun; Raman, Vijaya; Khanna, Deepti; Mehra, Ruchika; Kurpad, Anura V; Srinivasan, Krishnamachari

    2016-12-01

    Assessment of developmental milestones based on locally developed norms is critical for accurate estimate of overall development of a child's cognitive, behavioral, social, and emotional development. A cross-sectional study was done to develop age specific norms for developmental milestones using Vineland Adaptive Behavior Scales (VABS-II) (Sparrow, Cicchetti, & Balla, 2005) for apparently healthy children from 2 to 5 years from urban Bangalore, India, and to examine its association with anthropometric measures. Mothers (or caregivers) of 412 children participated in the study. Age-specific norms using inferential norming method and adaptive levels for all domains and subdomains were derived. Low adaptive level, also called delayed developmental milestone, was observed in 2.3% of the children, specifically 2.7% in motor and daily living skills and 2.4% in communication skills. When these children were assessed on the existing U.S. norms, there was a significant overestimation of delayed development in socialization and motor skills, whereas delay in communication and daily living skills were underestimated (all p < .01). Multiple linear regression revealed that stunted and underweight children had significantly lower developmental scores for communication and motor skills compared with normal children (β coefficient ranges from 2.6-5.3; all p < .01). In the absence of Indian normative data for VABS-II in preschool children, the prevalence of developmental delay could either be under- or overestimated using Western norms. Thus, locally referenced norms are critical for reliable assessments of development in children. Stunted and underweight children are more likely to have poorer developmental scores compared with healthy children. (PsycINFO Database Record (c) 2016 APA, all rights reserved).

  20. The Importance of Symptom Validity Testing in Adolescents and Young Adults Undergoing Assessments for Learning or Attention Difficulties

    ERIC Educational Resources Information Center

    Harrison, Allyson G.; Green, Paul; Flaro, Lloyd

    2012-01-01

    It is almost self-evident that test results will be unreliable and misleading if those undergoing assessments do not make a full effort on testing. Nevertheless, objective tests of effort have not typically been used with young adults to determine whether test results are valid or not. Because of the potential economic and/or recreational benefits…

  1. NASA Dryden's F-15B aircraft with the Gulfstream Quiet Spike sonic boom mitigator attached undergoes ground vibration testing in preparation for test flights

    NASA Image and Video Library

    2006-05-01

    NASA Dryden's F-15B testbed aircraft with the Gulfstream Quiet Spike sonic boom mitigator attached undergoes ground vibration testing in preparation for test flights. The project seeks to verify the structural integrity of the multi-segmented, articulating spike attachment designed to reduce and control a sonic boom.

  2. A pretest prognostic score to assess patients undergoing exercise or pharmacological stress testing

    PubMed Central

    Morise, Anthony; Evans, Matthew; Jalisi, Farrukh; Shetty, Rajendra; Stauffer, Marc

    2007-01-01

    Objective A previously developed pretest score was validated to stratify patients presenting for exercise testing with suspected coronary disease according to the presence of angiographic coronary disease. Our goal was to determine how well this pretest score risk stratified patients undergoing pharmacological and exercise stress tests concerning prognostic endpoints. Design Retrospective cohort analysis. Setting University hospital stress laboratory. Patients 7452 unselected ambulatory patients with symptoms of suspected coronary disease undergoing stress testing between 1995 and 2004. Main outcomes measures All‐cause death, cardiac death and non‐fatal myocardial infarction. Results The rate of all‐cause death was 5.5% (CI 5.0 to 6.1) with 4.3 (SD 2.4) years of follow‐up (Exercise 2.8% (CI 2.3 to 3.2) v Pharmacological group 11.9% (CI 10.5 to 13.3); p<0.001). The rate of cardiac death/myocardial infarction was 2.6% (CI 2.2 to 3.0) (Exercise 1.4% (CI 1.1 to 1.8) v Pharmacological group 5.3% (CI 4.3 to 6.2); p<0.001). In both groups, stratification by pretest score was significant for all‐cause death and the combined endpoint. However, stratification was more effective in the pharmacological group using the combined endpoint rather than all‐cause death. Pharmacological stress patients in intermediate and high risk groups were at higher risk than their respective exercise test cohorts. Referral for pharmacological stress testing was found to be an independent predictor of time to death (2.7 (CI 2.0 to 3.6); p<0.001). Conclusion A pretest score previously validated to stratify according to angiographic outcomes, effectively risk stratified pharmacological and exercise stress patients according to the combined endpoint of cardiac death/myocardial infarction. PMID:17228070

  3. Completed Gravity Probe B Undergoes Thermal Vacuum Testing

    NASA Technical Reports Server (NTRS)

    2000-01-01

    The Gravity Probe B (GP-B) is the relativity experiment developed at Stanford University to test two extraordinary predictions of Albert Einstein's general theory of relativity. The experiment will measure, very precisely, the expected tiny changes in the direction of the spin axes of four gyroscopes contained in an Earth-orbiting satellite at a 400-mile altitude. So free are the gyroscopes from disturbance that they will provide an almost perfect space-time reference system. They will measure how space and time are very slightly warped by the presence of the Earth, and, more profoundly, how the Earth's rotation very slightly drags space-time around with it. These effects, though small for the Earth, have far-reaching implications for the nature of matter and the structure of the Universe. In this photograph, the completed space vehicle is undergoing thermal vacuum environment testing. GP-B is among the most thoroughly researched programs ever undertaken by NASA. This is the story of a scientific quest in which physicists and engineers have collaborated closely over many years. Inspired by their quest, they have invented a whole range of technologies that are already enlivening other branches of science and engineering. Launched April 20, 2004 , the GP-B program was managed for NASA by the Marshall Space Flight Center. Development of the GP-B is the responsibility of Stanford University along with major subcontractor Lockheed Martin Corporation. (Image credit to Russ Underwood, Lockheed Martin Corporation.)

  4. Data of piezoelectric vibration energy harvesting of a bridge undergoing vibration testing and train passage.

    PubMed

    Cahill, Paul; Hazra, Budhaditya; Karoumi, Raid; Mathewson, Alan; Pakrashi, Vikram

    2018-04-01

    The data presented in this article is in relation to the research article "Vibration energy harvesting based monitoring of an operational bridge undergoing forced vibration and train passage" Cahill et al. (2018) [1]. The article provides data on the full-scale bridge testing using piezoelectric vibration energy harvesters on Pershagen Bridge, Sweden. The bridge is actively excited via a swept sinusoidal input. During the testing, the bridge remains operational and train passages continue. The test recordings include the voltage responses obtained from the vibration energy harvesters during these tests and train passages. The original dataset is made available to encourage the use of energy harvesting for Structural Health Monitoring.

  5. Incidence of Pneumothorax in Patients With Lymphangioleiomyomatosis Undergoing Pulmonary Function and Exercise Testing.

    PubMed

    Taveira-DaSilva, Angelo M; Julien-Williams, Patricia; Jones, Amanda M; Moss, Joel

    2016-07-01

    Because pneumothorax is frequent in lymphangioleiomyomatosis, patients have expressed concerns regarding the risk of pneumothorax associated with pulmonary function or exercise testing. Indeed, pneumothorax has been reported in patients with lung disease after both of these tests. The aim of this study was to determine the incidence of pneumothorax in patients with lymphangioleiomyomatosis during admissions to the National Institutes of Health Clinical Research Center between 1995 and 2015. Medical records were reviewed to identify patients who had a pneumothorax during their stay at the National Institutes of Health. A total of 691 patients underwent 4,523 pulmonary function tests and 1,900 exercise tests. Three patients developed pneumothorax after pulmonary function tests and/or exercise tests. The incidence of pneumothorax associated with lung function testing was 0.14 to 0.29 of 100 patients or 0.02 to 0.04 of 100 tests. The incidence of pneumothorax in patients undergoing exercise testing was 0.14 to 0.28 of 100 patients or 0.05 to 0.10 of 100 tests. The risk of pneumothorax associated with pulmonary function or exercise testing in patients with lymphangioleiomyomatosis is low. Published by Elsevier Inc.

  6. Genetic testing in patients with acute coronary syndrome undergoing percutaneous coronary intervention: a cost-effectiveness analysis.

    PubMed

    Lala, A; Berger, J S; Sharma, G; Hochman, J S; Scott Braithwaite, R; Ladapo, J A

    2013-01-01

    The CYP2C19 genotype is a predictor of adverse cardiovascular events in acute coronary syndrome (ACS) patients undergoing percutaneous coronary intervention (PCI) treated with clopidogrel. We aimed to evaluate the cost-effectiveness of a CYP2C19*2 genotype-guided strategy of antiplatelet therapy in ACS patients undergoing PCI, compared with two 'no testing' strategies (empiric clopidogrel or prasugrel). We developed a Markov model to compare three strategies. The model captured adverse cardiovascular events and antiplatelet-related complications. Costs were expressed in 2010 US dollars and estimated using diagnosis-related group codes and Medicare reimbursement rates. The net wholesale price for prasugrel was estimated as $5.45 per day. A generic estimate for clopidogrel of $1.00 per day was used and genetic testing was assumed to cost $500. Base case analyses demonstrated little difference between treatment strategies. The genetic testing-guided strategy yielded the most QALYs and was the least costly. Over 15 months, total costs were $18 lower with a gain of 0.004 QALY in the genotype-guided strategy compared with empiric clopidogrel, and $899 lower with a gain of 0.0005 QALY compared with empiric prasugrel. The strongest predictor of the preferred strategy was the relative risk of thrombotic events in carriers compared with wild-type individuals treated with clopidogrel. Above a 47% increased risk, a genotype-guided strategy was the dominant strategy. Above a clopidogrel cost of $3.96 per day, genetic testing was no longer dominant but remained cost-effective. Among ACS patients undergoing PCI, a genotype-guided strategy yields similar outcomes to empiric approaches to treatment, but is marginally less costly and more effective. © 2012 International Society on Thrombosis and Haemostasis.

  7. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis approaches the Vehicle Assembly Building (VAB). It is being towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis approaches the Vehicle Assembly Building (VAB). It is being towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  8. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is towed from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is towed from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  9. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis nears the Vehicle Assembly Building (VAB). It is being towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis nears the Vehicle Assembly Building (VAB). It is being towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  10. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis moves into high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis moves into high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  11. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis awaits a tow from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis awaits a tow from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  12. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis awaits transport from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis awaits transport from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  13. KENNEDY SPACE CENTER, FLA. - Workers back the Space Shuttle orbiter Atlantis out of the Orbiter Processing Facility (OPF) for its move to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - Workers back the Space Shuttle orbiter Atlantis out of the Orbiter Processing Facility (OPF) for its move to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  14. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is moved into high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is moved into high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  15. KENNEDY SPACE CENTER, FLA. - Workers prepare to tow the Space Shuttle orbiter Atlantis from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - Workers prepare to tow the Space Shuttle orbiter Atlantis from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  16. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is moments away from a tow from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is moments away from a tow from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  17. KENNEDY SPACE CENTER, FLA. - Workers monitor the Space Shuttle orbiter Atlantis as it is towed from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - Workers monitor the Space Shuttle orbiter Atlantis as it is towed from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  18. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis approaches the Vehicle Assembly Building (VAB) high bay 4. It is being towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis approaches the Vehicle Assembly Building (VAB) high bay 4. It is being towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  19. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis approaches high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis approaches high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  20. KENNEDY SPACE CENTER, FLA. - Workers walk with Space Shuttle orbiter Atlantis from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB) high bay 4. The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - Workers walk with Space Shuttle orbiter Atlantis from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB) high bay 4. The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  1. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis backs out of the Orbiter Processing Facility (OPF) for its move to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis backs out of the Orbiter Processing Facility (OPF) for its move to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  2. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis arrives in high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis arrives in high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  3. The Aerostructures Test Wing (ATW) experiment, which consisted of an 18-inch carbon fiber test wing with surface-mounted piezoelectric strain actuators, undergoing ground testing prior to flight on Dryden's F-15B Research Testbed aircraft

    NASA Image and Video Library

    2001-03-28

    The Aerostructures Test Wing (ATW) experiment, which consisted of an 18-inch carbon fiber test wing with surface-mounted piezoelectric strain actuators, undergoing ground testing prior to flight on Dryden's F-15B Research Testbed aircraft

  4. Cassini's RTGs undergo mechanical and electrical verification testing in the PHSF

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Jet Propulsion Laboratory (JPL) engineers examine the interface surface on the Cassini spacecraft prior to installation of the third radioisotope thermoelectric generator (RTG). The other two RTGs, at left, already are installed on Cassini. The three RTGs will be used to power Cassini on its mission to the Saturnian system. They are undergoing mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL.

  5. Cassini's RTGs undergo mechanical and electrical verification tests in the PHSF

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Workers in the Payload Hazardous Servicing Facility remove the storage collar from a radioisotope thermoelectric generator (RTG) in preparation for installation on the Cassini spacecraft. Cassini will be outfitted with three RTGs. The power units are undergoing mechanical and electrical verification tests in the PHSF. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle.

  6. 'Is Going through Clinical Test a Headache?' An HRV Study and Descriptive Report of Subjective Experience of Undergoing EEG Testing.

    PubMed

    Kathrotia, Rajesh; Singh, Yogesh; Goel, Arun; Patil, Prashant

    2016-03-01

    To explore the heart rate variability (HRV) changes and subjective perception of undergoing electroencephalography (EEG). We conducted a study on 35 healthy male volunteers. The intervention consisted of placing 23 disc-type EEG electrodes of 5-7 mm diameter with long flexible lead according to international 10-20 system for the duration of 30 min, in a sitting position, on the scalp. The outcome measures were time and frequency domain parameters of HRV analysis and descriptive report of subjective experiences on a 3-point Likert scale. The perception of undergoing EEG ranged from pleasant to uneasy. For 13 (37%) participants it was soothing and relaxing, for 11 (31.5%) it was neutral and for the rest 11 (31.5%) it was uneasy and restrictive in nature. However, HRV analysis of the pre and post EEG, showed no statistically significant difference. In our study, the mixed subjective experience of undergoing EEG may be due to individual variation in the perception of the intervention. No difference in HRV parameters may be because of 2 possibilities. The first possibility is varied experiences of procedure with temporal progression. Same participants may have experienced 2 opposite extremes of experiences over and over again, which may have cancelled out sympathetic and parasympathetic responses. The second possibility may be that no stress is generated during clinical test.

  7. Comparison of outcomes in patients undergoing defibrillation threshold testing at the time of implantable cardioverter-defibrillator implantation versus no defibrillation threshold testing.

    PubMed

    Hall, Burr; Jeevanantham, Vinodh; Levine, Ethan; Daubert, James; McNitt, Scott; Hall, Freburr; Jeevanantham, Vinodh; Levine, Ethan; Daubert, James; McNitt, Scott; Hall, Fred Morady And Frank Pelosiburr; Jeevanantham, Vinodh; Levine, Ethan; Daubert, James; McNitt, Scott; Morady, Fred Morady And Frank Pelosid; Pelosi, Frank

    2007-01-01

    Inability to perform defibrillation threshold (DFT) testing during implantable cardioverter defibrillator (ICD) implantation due to co-morbidities may influence long-term survival. Retrospective review at The University of Michigan (1999-2004) identified 55 patients undergoing ICD implantation without DFT testing ("No-DFT group"). A randomly selected sample of patients (n = 57) undergoing standard DFT testing ("DFT group") was compared in terms of appropriate shocks, clinical shock efficacy and all-cause mortality. DFT testing was withheld due to hypotension, atrial fibrillation with inability to exclude left atrial thrombus, left ventricular thrombus, CHF and/or ischemia. The No-DFT group had a similar appropriate shock rate, but lower total survival (69.1% vs. 91.2%, p = 0.004) than the DFT group. The No-DFT group had a higher incidence of ventricular fibrillation (VF) episodes (9.1% vs. 3.1%, p = 0.037), and deaths attributable to VF (3 of 17 deaths vs. 0 of 5 deaths) compared to the DFT group. Multivariate analysis found a trend toward increased risk of death in the No-DFT group (HR 3.18, 95% CI 0.82-12.41, p = 0.095) after adjusting for baseline differences in gender distribution, NYHA class and prior CABG. In summary, overall mortality was higher in the No-DFT group. More deaths attributable to VF occurred in the No-DFT group. Thus, DFT testing should therefore remain the standard of care. Nevertheless, ICD therapy should not be withheld in patients who meet appropriate implant criteria simply on the basis of clinical scenarios that preclude routine DFT testing. (Cardiol J 2007; 14: 463-469).

  8. Cassini's RTGs undergo mechanical and electrical verification tests in the PHSF

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Jet Propulsion Laboratory (JPL) worker Mary Reaves mates connectors on a radioisotope thermoelectric generator (RTG) to power up the Cassini spacecraft, while quality assurance engineer Peter Sorci looks on. The three RTGs which will be used on Cassini are undergoing mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed by JPL.

  9. Diagnostic work up for language testing in patients undergoing awake craniotomy for brain lesions in language areas.

    PubMed

    Bilotta, Federico; Stazi, Elisabetta; Titi, Luca; Lalli, Diana; Delfini, Roberto; Santoro, Antonio; Rosa, Giovanni

    2014-06-01

    Awake craniotomy is the technique of choice in patients with brain tumours adjacent to primary and accessory language areas (Broca's and Wernicke's areas). Language testing should be aimed to detect preoperative deficits, to promptly identify the occurrence of new intraoperative impairments and to establish the course of postoperative language status. Aim of this case series is to describe our experience with a dedicated language testing work up to evaluate patients with or at risk for language disturbances undergoing awake craniotomy for brain tumour resection. Pre- and intra operative testing was accomplished with 8 tests. Intraoperative evaluation was accomplished when patients were fully cooperative (Ramsey < 3). Postoperative evaluation was scheduled at early (within 21 days) and long-term follow-up (3-6 months). Twenty consecutive patients were prospectively recruited. Preoperative language testings were normal in 9 patients (45%), showed mild to moderate language deficit in 8 (40%) and severe language deficit or aphasic disorders in 3 (15%). Broca's area was identified in 15 patients, in all cases by counting arrest during stimulation and in 12 cases by naming arrest. In this article we describe our experience using a language testing work up to evaluate - pre, intra and postoperatively - patients undergoing awake craniotomy for brain tumour resection with preoperative language disturbances or at risk for postoperative language deficits. This approach allows a systematic evaluation and recording of language function status and can be accomplished even when a neuropsychologist or speech therapist are not involved in the operation crew.

  10. Medical clowns ease anxiety and pain perceived by children undergoing allergy prick skin tests.

    PubMed

    Goldberg, A; Stauber, T; Peleg, O; Hanuka, P; Eshayek, L; Confino-Cohen, R

    2014-10-01

    Intervention of medical clowns (MC) during various medical procedures performed in children has been used to relieve anxiety and pain. Their role in allergy skin testing has never been evaluated. To evaluate whether MC can diminish pain and anxiety perceived by children undergoing allergy skin prick tests (SPT). In a prospective, randomized, controlled, and blinded study, children undergoing SPT were or were not accompanied by MC. All parents and children ≥8 years completed the State-Trait Anxiety Inventory (STAI) before and after SPT. Videotapes recorded during the procedure were scored for anxiety (m-YPAS) for all children and for pain (FLACC) for children 2-7 years old by a psychologist who was unaware of the MC's presence. After SPT, children ≥8 years completed a visual analog score (VAS) for pain. Ninety-one children (mean age 8.2 years, M/F = 54/37) were recruited of whom 45 were accompanied by clowns. A significant reduction in state-STAI was found in the clowns group, in both parents and children, when compared with the regular group (26.9 ± 6.6 and 32.3 ± 10.0; P = 0.004, and 27.1 ± 4.2 and 34.3 ± 7.6; P = 0.002, respectively). Both m-YPAS and FLACC were reduced in the clowns group compared with the regular one. In the clowns group, m-YPAS positively correlated with both VAS and FLACC (P = 0.000 and 0.002, respectively). m-YPAS was positively correlated with FLACC in the regular group (P = 0.000). Medical clowns significantly decrease the level of anxiety perceived by both children undergoing allergy SPT and their parents, as well as the pain perceived by young children. © 2014 John Wiley & Sons A/S. Published by John Wiley & Sons Ltd.

  11. STS-79 Atlantis approaches the VAB

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The Space Shuttle Atlantis begins its move into the Vehicle Assembly Building for shelter from the effects of Hurricane Fran. Atlantis is completing its rollback from Launch Pad 39A, where it was undergoing preparations for Mission STS-79. This marks the second rollback for Atlantis since July because of hurricane threats. The threat of Hurricane Bertha forced the rollback of Atlantis in July. Atlantis currently is scheduled for launch on the fourth Shuttle-Mir docking mission around mid-September.

  12. KSC-2009-3675

    NASA Image and Video Library

    2009-06-11

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the Ares I-X forward assembly comprising the frustum, forward skirt extension and forward skirt , at left, moves toward the Vehicle Assembly Building, in the background. In the VAB's High Bay 4, the forward assembly will undergo processing and stacking to the upper stage. Ares I-X is the flight test for the Ares I which will provide NASA an early opportunity to test and prove hardware, facilities and ground operations associated with Ares I, which is part of the Constellation Program to return men to the moon and beyond. Launch of the Ares I-X flight test is targeted for August 2009. Photo credit: NASA/Jack Pfaller

  13. KSC-2009-3676

    NASA Image and Video Library

    2009-06-11

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the Ares I-X forward assembly comprising the frustum, forward skirt extension and forward skirt heads for the Vehicle Assembly Building, in the background. In the VAB's High Bay 4, the forward assembly will undergo processing and stacking to the upper stage. Ares I-X is the flight test for the Ares I which will provide NASA an early opportunity to test and prove hardware, facilities and ground operations associated with Ares I, which is part of the Constellation Program to return men to the moon and beyond. Launch of the Ares I-X flight test is targeted for August 2009. Photo credit: NASA/Jack Pfaller

  14. Cassini's RTGs undergo mechanical and electrical verification tests in the PHSF

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Jet Propulsion Laboratory (JPL) employees bolt a radioisotope thermoelectric generator (RTG) onto the Cassini spacecraft, at left, while other JPL workers, at right, operate the installation cart on a raised platform in the Payload Hazardous Servicing Facility (PHSF). Cassini will be outfitted with three RTGs. The power units are undergoing mechanical and electrical verification tests in the PHSF. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed by JPL.

  15. Cassini's RTGs undergo mechanical and electrical verification testing in the PHSF

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Jet Propulsion Laboratory (JPL) workers carefully roll into place a platform with a second radioisotope thermoelectric generator (RTG) for installation on the Cassini spacecraft. In background at left, the first of three RTGs already has been installed on Cassini. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. The power units are undergoing mechanical and electrical verification testing in the Payload Hazardous Servicing Facility. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate far from the Sun where solar power systems are not feasible. The Cassini mission is scheduled for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle. Cassini is built and managed for NASA by JPL.

  16. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is turned into position outside the Orbiter Processing Facility (OPF) for its tow to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is turned into position outside the Orbiter Processing Facility (OPF) for its tow to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  17. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is almost in position in high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is almost in position in high bay 4 of the Vehicle Assembly Building (VAB). It was towed from the Orbiter Processing Facility (OPF) to allow work to be performed in the bay that can only be accomplished while it is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  18. KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is reflected in a rain puddle as it is towed from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-05

    KENNEDY SPACE CENTER, FLA. - The Space Shuttle orbiter Atlantis is reflected in a rain puddle as it is towed from the Orbiter Processing Facility (OPF) to the Vehicle Assembly Building (VAB). The move will allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the processing facility includes annual validation of the bay's cranes, work platforms, lifting mechanisms, and jack stands. Atlantis will remain in the VAB for about 10 days, then return to the OPF as work resumes to prepare it for launch in September 2004 on the first return-to-flight mission, STS-114.

  19. Evaluating compliance with institutional preoperative testing guidelines for minimal-risk patients undergoing elective surgery.

    PubMed

    Siriussawakul, Arunotai; Nimmannit, Akarin; Rattana-arpa, Sirirat; Chatrattanakulchai, Siritda; Saengtawan, Puttachard; Wangdee, Aungsumat

    2013-01-01

    Few investigations preoperatively are important for low-risk patients. This study was designed to determine the level of compliance with preoperative investigation guidelines for ASA I patients undergoing elective surgery. Secondary objectives included the following: to identify common inappropriate investigations, to evaluate the impact of abnormal testing on patient management, to determine factors affecting noncompliant tests, and to estimate unnecessary expenditure. This retrospective study was conducted on adult patients over a one-year period. The institute's guidelines recommend tests according to the patients' age groups: a complete blood count (CBC) for those patients aged 18-45; CBC, chest radiograph (CXR) and electrocardiography (ECG) for those aged 46-60; and CBC, CXR, ECG, electrolytes, blood glucose, blood urea nitrogen (BUN), and creatinine (Cr) for patients aged 61-65. The medical records of 1,496 patients were reviewed. Compliant testing was found in only 12.1% (95% CI, 10.5-13.9). BUN and Cr testings were the most frequently overprescribed tests. Overinvestigations tended to be performed on major surgery and younger patients. Overall, overinvestigation incurred an estimated cost of US 200,000 dollars during the study period. The need to utilize the institution's preoperative guidelines should be emphasized in order to decrease unnecessary testing and the consequential financial burden.

  20. Determinants of distance walked during the six-minute walk test in patients undergoing cardiac surgery at hospital discharge

    PubMed Central

    2014-01-01

    Introduction The aim of this study was to identify the determinants of distance walked in six-minute walk test (6MWD) in patients undergoing cardiac surgery at hospital discharge. Methods The assessment was performed preoperatively and at discharge. Data from patient records were collected and measurement of the Functional Independence Measure (FIM) and the Nottingham Health Profile (NHP) were performed. The six-minute walk test (6MWT) was performed at discharge. Patients undergoing elective cardiac surgery, coronary artery bypass grafting or valve replacement were eligible. Patients older than 75 years who presented arrhythmia during the protocol, with psychiatric disorders, muscular or neurological disorders were excluded from the study. Results Sixty patients (44.26% male, mean age 51.53 ± 13 years) were assessed. In multivariate analysis the following variables were selected: type of surgery (P = 0.001), duration of cardiopulmonary bypass (CPB) (P = 0.001), Functional Independence Measure - FIM (0.004) and body mass index - BMI (0.007) with r = 0.91 and r2 = 0.83 with P < 0.001. The equation derived from multivariate analysis: 6MWD = Surgery (89.42) + CPB (1.60) + MIF (2.79 ) - BMI (7.53) - 127.90. Conclusion In this study, the determinants of 6MWD in patients undergoing cardiac surgery were: the type of surgery, CPB time, functional capacity and body mass index. PMID:24885130

  1. KSC-2009-3677

    NASA Image and Video Library

    2009-06-11

    CAPE CANAVERAL, Fla. – At NASA's Kennedy Space Center in Florida, the Ares I-X forward assembly comprising the frustum, forward skirt extension and forward skirt moves into the transfer aisle of the Vehicle Assembly Building. The assembly will be placed in the VAB's High Bay 4 where it will undergo processing and stacking to the upper stage. Ares I-X is the flight test for the Ares I which will provide NASA an early opportunity to test and prove hardware, facilities and ground operations associated with Ares I, which is part of the Constellation Program to return men to the moon and beyond. Launch of the Ares I-X flight test is targeted for August 2009. Photo credit: NASA/Jack Pfaller

  2. MARINER 10 LAUNCH VEHICLE ATLAS CENTAUR 34 UNDERGOES TANKING TEST AT LAUNCH COMPLEX 36B

    NASA Technical Reports Server (NTRS)

    1973-01-01

    Atlas Centaur 34, undergoes tanking test on NASA Complex 36B at Cape Kennedy, Fla. Atlas Centaur 34 is under preparation to launch history's first duel-planet flight, the Mariner mission to Venus and Mercury, scheduled for early November. With all events going as planned, the Mariner spacecraft will fly by Venus in early February, 1974, and reach Mercury in late march, 1974. The spacecraft, Mariner 10, will carry two television cameras to photograph the planets, and six other scientific experiments to return planetary and interplanetary data back to Earth.

  3. Advanced Low NO Sub X Combustors for Supersonic High-Altitude Aircraft Gas Turbines

    NASA Technical Reports Server (NTRS)

    Roberts, P. B.; White, D. J.; Shekleton, J. R.

    1975-01-01

    A test rig program was conducted with the objective of evaluating and minimizing the exhaust emissions, in particular NO sub x, of three advanced aircraft combustor concepts at a simulated, high altitude cruise condition. The three combustor designs, all members of the lean reaction, premixed family, are the Jet Induced Circulation (JIC) combustor, the Vortex Air Blast (VAB) combustor, and a catalytic combustor. They were rig tested in the form of reverse flow can combustors in the 0.127 m. (5.0 in.) size range. Various configuration modifications were applied to each of the initial JIC and VAB combustor model designs in an effort to reduce the emissions levels. The VAB combustor demonstrated a NO sub x level of 1.1 gm NO2/kg fuel with essentially 100% combustion efficiency at the simulated cruise combustor condition of 50.7 N/sq cm (5 atm), 833 K (1500 R) inlet pressure and temperature respectively and 1778 K (3200 R) outlet temperature on Jet-A1 fuel. Early tests on the catalytic combustor were unsuccessful due to a catalyst deposition problem and were discontinued in favor of the JIC and VAB tests. In addition emissions data were obtained on the JIC and VAB combustors at low combustor inlet pressure and temperatures that indicate the potential performance at engine off-design conditions.

  4. An Inexpensive, Point-of-Care Urine Test for Bladder Cancer in Patients Undergoing Hematuria Evaluation.

    PubMed

    Acharya, Abhinav P; Theisen, Kathryn M; Correa, Andres; Meyyappan, Thiagarajan; Apfel, Abraham; Sun, Tao; Tarin, Tatum V; Little, Steven R

    2017-11-01

    Although hematuria (blood in urine) is the most common symptom of bladder cancer, 70-98% of hematuria cases are benign. These hematuria patients unnecessarily undergo costly, invasive, and expensive evaluation for bladder cancer. Therefore, there remains a need for noninvasive office-based tests that can rapidly and reliably rule out bladder cancer in patients undergoing hematuria evaluation. Herein, a clinical assay for matrix metalloproteinases ("Ammps") is presented, which generates a visual signal based on the collagenase activity (in urine of patients) on the Ammps substrates. Ammps substrates are generated by crosslinking gelatin with Fe(II) chelated alginate nanoparticles, which precipitate in urine samples. The cleavage of gelatin-conjugated alginate (Fe(II)) nanoparticles by collagenases generates free-floating alginate (Fe(II)) nanoparticles that participate in Fenton's reaction to generate a visual signal. In a pilot study of 88 patients, Ammps had 100% sensitivity, 85% specificity, and a negative predictive value (NPV) of 100% for diagnosing bladder cancer. This high NPV can be useful in ruling out bladder cancer in patients referred for hematuria evaluation. © 2017 WILEY-VCH Verlag GmbH & Co. KGaA, Weinheim.

  5. Analyses of the Complexity of Patients Undergoing Attended Polysomnography in the Era of Home Sleep Apnea Tests

    PubMed Central

    Colaco, Brendon; Herold, Daniel; Johnson, Matthew; Roellinger, Daniel; Naessens, James M.; Morgenthaler, Timothy I.

    2018-01-01

    Study Objectives: Health care complexity includes dimensions of patient comorbidity and the level of services needed to meet patient demands. Home sleep apnea tests (HSAT) are increasingly used to test medically uncomplicated patients suspected of having moderate to severe obstructive sleep apnea (OSA). Patients with significant comorbidities or other sleep disorders are not candidates for HSAT and require attended in-center polysomnography. We hypothesized that this trend would result in increasingly complex patients being studied in sleep centers. Methods: Our study had two parts. To ascertain trends in sleep patient comorbidity, we used administrative diagnostic codes from patients undergoing polysomnography at the Mayo Clinic Center for Sleep Medicine from 2005 to June 2015 to calculate the Charlson and the Elixhauser comorbidity indices. We measured the level of services provided in two ways: (1) in a subset of patients from the past 2 months of 2015, we evaluated correlation of these morbidity indices with an internally developed Polysomnogram Clinical Index (PSGCI) rating anticipated patient care needs from 0 to 3 and (2) we measured the sleep study complexity based on polysomnography protocol design. Results: In 43,780 patients studied from 2005 to June 2015, the Charlson index increased from a mean of 1.38 to 1.88 (3.1% per year, P < .001) and the mean Elixhauser index increased from 2.61 to 3.35 (2.5% per year, P < .001). Both comorbidity indices were significantly higher at the highest (Level 3) level of the PSGCI (P < .001), and sleep study complexity increased over time. Conclusions: The complexity of patients undergoing attended polysomnography has increased by 28% to 36% over the past decade as measured by validated comorbidity indices, and these indices correlate with the complexity of rendered care during polysomnography. These findings have implications for increasing requirements for staffing, monitoring capabilities, and facility design of

  6. [A case of bilateral testicular tumors showing remarkable regression of huge metastatic tumors after VAB-6 combined chemotherapy].

    PubMed

    Nakashima, T; Nakajima, K; Yokoyama, O; Sugata, T; Tokunaga, S; Nitta, M; Hisazumi, H

    1988-10-01

    A case of bilateral testicular seminomas with abdominal huge metastatic tumors is presented. The patient is a 23-year-old male. An abdominal huge mass was found incidentally by a physician. CT scan and ultrasonography revealed the presence of the tumor in the left retroperitoneal space and biopsy specimen of the abdominal tumor was diagnosed as seminoma. On March 7, 1985, he was referred to our clinic. Bilateral testicular tumors were detected on palpation and ultrasonography. Bilateral orchiectomy was performed. Histological diagnosis was pure seminoma. After four sessions of VAB-6 combined chemotherapy, the abdominal tumor, 14.1 x 12.3 cm in size, decreased to 5.7 x 4.4 cm ( a regression rate of 85.5%). Retroperitoneal lymph-node dissection was undertaken, but the abdominal tumor could not be resected completely. Histological examination of the resected tumor revealed complete necrosis of the tumor tissue. After the operation, one session of the chemotherapy and irradiation were added. A total of 109 cases of bilateral testicular germ cell tumors in Japan was reviewed.

  7. The responsiveness of sensibility and strength tests in patients undergoing carpal tunnel decompression

    PubMed Central

    2011-01-01

    Background Several clinical measures of sensory and motor function are used alongside patient-rated questionnaires to assess outcomes of carpal tunnel decompression. However there is a lack of evidence regarding which clinical tests are most responsive to clinically important change over time. Methods In a prospective cohort study 63 patients undergoing carpal tunnel decompression were assessed using standardised clinician-derived and patient reported outcomes before surgery, at 4 and 8 months follow up. Clinical sensory assessments included: touch threshold with monofilaments (WEST), shape-texture identification (STI™ test), static two-point discrimination (Mackinnon-Dellon Disk-Criminator) and the locognosia test. Motor assessments included: grip and tripod pinch strength using a digital grip analyser (MIE), manual muscle testing of abductor pollicis brevis and opponens pollicis using the Rotterdam Intrinsic Handheld Myometer (RIHM). The Boston Carpal Tunnel Questionnaire (BCTQ) was used as a patient rated outcome measure. Results Relative responsiveness at 4 months was highest for the BCTQ symptom severity scale with moderate to large effects sizes (ES = -1.43) followed by the BCTQ function scale (ES = -0.71). The WEST and STI™ were the most responsive sensory tests at 4 months showing moderate effect sizes (WEST ES = 0.55, STI ES = 0.52). Grip and pinch strength had a relatively higher responsiveness compared to thenar muscle strength but effect sizes for all motor tests were very small (ES ≤0.10) or negative indicating a decline compared to baseline in some patients. Conclusions For clinical assessment of sensibility touch threshold assessed by monofilaments (WEST) and tactile gnosis measured with the STI™ test are the most responsive tests and are recommended for future studies. The use of handheld myometry (RIHM) for manual muscle testing, despite more specifically targeting thenar muscles, was less responsive than grip or tripod pinch testing using

  8. Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna

    NASA Image and Video Library

    2017-04-27

    The Orion heat shield from Exploration Flight Test-1 has arrived in High Bay 2 of the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  9. Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna

    NASA Image and Video Library

    2017-04-27

    Inside High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, the Orion heat shield from Exploration Flight Test-1 is secured on foam blocks. The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  10. Surrounded by work platforms, the full-scale Orion AFT crew module (center) is undergoing preparations for the first flight test of Orion's launch abort system.

    NASA Image and Video Library

    2008-05-20

    Surrounded by work platforms, NASA's first full-scale Orion abort flight test (AFT) crew module (center) is undergoing preparations at the NASA Dryden Flight Research Center in California for the first flight test of Orion's launch abort system.

  11. Workers in the VAB test SRB cables on STS-98 solid rocket boosters

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- Working near the top of a solid rocket booster, NASA and United Space Alliance SRB technicians hook up SRB cables to a CIRRUS computer for testing. From left are Jim Glass, with USA, performing a Flex test on the cable; Steve Swichkow, with NASA, and Jim Silviano, with USA, check the results on a computer. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA'''s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6.

  12. Test Cases for a Rectangular Supercritical Wing Undergoing Pitching Oscillations

    NASA Technical Reports Server (NTRS)

    Bennett, Robert M.

    2000-01-01

    Steady and unsteady measured pressures for a Rectangular Supercritical Wing (RSW) undergoing pitching oscillations have been presented. From the several hundred compiled data points, 27 static and 36 pitching oscillation cases have been proposed for computational Test Cases to illustrate the trends with Mach number, reduced frequency, and angle of attack. The wing was designed to be a simple configuration for Computational Fluid Dynamics (CFD) comparisons. The wing had an unswept rectangular planform plus a tip of revolution, a panel aspect ratio of 2.0, a twelve per cent thick supercritical airfoil section, and no twist. The model was tested over a wide range of Mach numbers, from 0.27 to 0.90, corresponding to low subsonic flows up to strong transonic flows. The higher Mach numbers are well beyond the design Mach number such as might be required for flutter verification beyond cruise conditions. The pitching oscillations covered a broad range of reduced frequencies. Some early calculations for this wing are given for lifting pressure as calculated from a linear lifting surface program and from a transonic small perturbation program. The unsteady results were given primarily for a mild transonic condition at M = 0.70. For these cases the agreement with the data was only fair, possibly resulting from the omission of viscous effects. Supercritical airfoil sections are known to be sensitive to viscous effects (for example, one case cited). Calculations using a higher level code with the full potential equations have been presented for one of the same cases, and with the Euler equations. The agreement around the leading edge was improved, but overall the agreement was not completely satisfactory. Typically for low-aspect-ratio rectangular wings, transonic shock waves on the wing tend to sweep forward from root to tip such that there are strong three-dimensional effects. It might also be noted that for most of the test, the model was tested with free transition, but a

  13. KENNEDY SPACE CENTER, FLA. - The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, along the crawlerway in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-17

    KENNEDY SPACE CENTER, FLA. - The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, along the crawlerway in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  14. Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna

    NASA Image and Video Library

    2017-04-27

    Inside High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers help prepare the Orion heat shield from Exploration Flight Test-1 for unloading off its transporter. The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  15. Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna

    NASA Image and Video Library

    2017-04-27

    Inside High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a worker helps prepare the Orion heat shield from Exploration Flight Test-1 for unloading off its transporter. The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  16. Defibrillation threshold testing fails to show clinical benefit during long-term follow-up of patients undergoing cardiac resynchronization therapy defibrillator implantation.

    PubMed

    Michowitz, Yoav; Lellouche, Nicolas; Contractor, Tahmeed; Bourke, Tara; Wiener, Isaac; Buch, Eric; Boyle, Noel; Bersohn, Malcolm; Shivkumar, Kalyanam

    2011-05-01

    The utility of defibrillation threshold testing in patients undergoing implantable cardioverter-defibrillator (ICD) implantation is controversial. Higher defibrillation thresholds have been noted in patients undergoing implantation of cardiac resynchronization therapy defibrillators (CRT-D). Since the risks and potential benefits of testing may be higher in this population, we sought to assess the impact of defibrillation safety margin or vulnerability safety margin testing in CRT-D recipients. A total of 256 consecutive subjects who underwent CRT-D implantation between January 2003 and December 2007 were retrospectively reviewed. Subjects were divided into two groups based on whether (n= 204) or not (n= 52) safety margin testing was performed. Patient characteristics, tachyarrhythmia therapies, procedural results, and clinical outcomes were recorded. Baseline characteristics, including heart failure (HF) severity, were comparable between the groups. Four cases of HF exacerbation (2%), including one leading to one death, were recorded in the tested group immediately post-implantation. No complications were observed in the untested group. After a mean follow-up of 32 ± 20 months, the proportion of appropriate shocks in the two groups was similar (31 vs. 25%, P = 0.49). There were three cases of failed appropriate shocks in the tested group, despite adequate safety margins at implantation, whereas no failed shocks were noted in the untested group. Survival was similar in the two groups. Defibrillation efficacy testing during implant of CRT-D was associated with increased morbidity and did not predict the success of future device therapy or improve survival during long-term follow-up.

  17. Introduction to Symposium and Intercorrelations, Sex, and Race Differences on the Vineland Adaptive Behavior Scales.

    ERIC Educational Resources Information Center

    Childers, John S.; And Others

    Preliminary findings are presented from a study of the performance of 99 institutionalized retarded children on the Vineland Adaptive Behavior Scale (VABS), a revised form of the Vineland Social Maturity Scale (VSMS). No significant sex or race differences were revealed on test performances. Mental age was found to correlate with VABS scores with…

  18. Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna

    NASA Image and Video Library

    2017-04-27

    Inside High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a worker monitors the progress as a crane lowers the Orion heat shield from Exploration Flight Test-1 onto foam blocks. The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  19. Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna

    NASA Image and Video Library

    2017-04-27

    Inside High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers monitor the progress as a crane lowers the Orion heat shield from Exploration Flight Test-1 onto foam blocks. The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  20. Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna

    NASA Image and Video Library

    2017-04-27

    Inside High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane is attached to the Orion heat shield from Exploration Flight Test-1 for unloading off its transporter. The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  1. The use of pre-test and post-test probability values as criteria before selecting patients to undergo coronary angiography in patients who have ischemic findings on myocardial perfusion scintigraphy.

    PubMed

    Karahan Şen, Nazlı Pınar; Bekiş, Recep; Ceylan, Ali; Derebek, Erkan

    2016-07-01

    Myocardial perfusion scintigraphy (MPS) is a diagnostic test which is frequently used in the diagnosis of coronary heart disease (CHD). MPS is generally interpreted as ischemia present or absent; however, it has a power in predicting the disease, similar to other diagnostic tests. In this study, we aimed to assist in directing the high-risk patients to undergo coronary angiography (CA) primarily by evaluating patients without prior CHD history with pre-test and post-test probabilities. The study was designed as a retrospective study. Between January 2008 and July 2011, 139 patients with positive MPS results and followed by CA recently (<6 months) were evaluated from patient files. Patients' pre-test probabilities based on the Diamond and Forrester method and the likelihood ratios that were obtained from the literature were used to calculate the patients' post exercise and post-MPS probabilities. Patients were evaluated in risk groups as low, intermediate, and high, and an ROC curve analysis was performed for the post-MPS probabilities. Coronary artery stenosis (CAS) was determined in 59 patients (42.4%). A significant difference was determined between the risk groups according to CAS, both for the pre-test and post-test probabilities (p<0.001, p=0.024). The ROC analysis provided a cut-off value of 80.4% for post- MPS probability in predicting CAS with 67.9% sensitivity and 77.8% specificity. When the post-MPS probability is ≥80% in patients who have reversible perfusion defects on MPS, we suggest interpreting the MPS as "high probability positive" to improve the selection of true-positive patients to undergo CA, and these patients should be primarily recommended CA.

  2. In-Situ Measurement of Power Loss for Crystalline Silicon Modules Undergoing Thermal Cycling and Mechanical Loading Stress Testing: Preprint

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Spataru, Sergiu; Hacke, Pater; Sera, Dezso

    2015-09-15

    We analyze the degradation of multi-crystalline silicon photovoltaic modules undergoing simultaneous thermal, mechanical, and humidity stress testing to develop a dark environmental chamber in-situ measurement procedure for determining module power loss. From the analysis we determine three main categories of failure modes associated with the module degradation consisting of: shunting, recombination losses, increased series resistance losses, and current mismatch losses associated with a decrease in photo-current generation by removal of some cell areas due to cell fractures. Based on the analysis, we propose an in-situ module power loss monitoring procedure that relies on dark current-voltage measurements taken during the stressmore » test, and initial and final module flash testing, to determine the power degradation characteristic of the module.« less

  3. Surrounded by work platforms, the full-scale Orion AFT crew module (center) is undergoing preparations for the first flight test of Orion's launch abort system.

    NASA Image and Video Library

    2008-05-20

    Surrounded by work platforms, NASA's first full-scale Orion abort flight test (AFT) crew module (center) is undergoing preparations at the NASA Dryden Flight Research Center in California for the first flight test of Orion's launch abort system. To the left is a space shuttle orbiter purge vehicle sharing the hangar.

  4. Orion EFT-1 Heat Shield Offload from Truck onto Foam Pads (Dunna

    NASA Image and Video Library

    2017-04-27

    Inside High Bay 2 in the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, a crane lifts the Orion heat shield from Exploration Flight Test-1 up off its transporter. It will be lowered onto foam blocks. The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  5. Further evidence for a deficit in switching attention in schizophrenia.

    PubMed

    Smith, G L; Large, M M; Kavanagh, D J; Karayanidis, F; Barrett, N A; Michie, P T; O'Sullivan, B T

    1998-08-01

    In this study, sustained, selective, divided, and switching attention, and reloading of working memory were investigated in schizophrenia by using a newly developed Visual Attention Battery (VAB). Twenty-four outpatients with schizophrenia and 24 control participants were studied using the VAB. Performance on VAB components was correlated with performance of standard tests. Patients with schizophrenia were significantly impaired on VAB tasks that required switching of attention and reloading of working memory but had normal performance on tasks involving sustained attention or attention to multiple stimulus features. Switching attention and reloading of working memory were highly correlated with Trails (B-A) score for patients. The decline in performance on the switching-attention task in patients with schizophrenia met criteria for a differential deficit in switching attention. Future research should examine the neurophysiological basis of the switching deficit and its sensitivity and specificity to schizophrenia.

  6. KSC-2011-5574

    NASA Image and Video Library

    2011-07-13

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doors -- finds shelter in the Vehicle Assembly Building, or VAB, after rolling from Orbiter Processing Facility-2, or OPF-2. Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html. Photo credit: NASA/Ken Thornsley

  7. KSC-2011-5549

    NASA Image and Video Library

    2011-07-13

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doors -- has arrived at the door of the Vehicle Assembly Building, or VAB, from Orbiter Processing Facility-2, or OPF-2. Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html. Photo credit: NASA/Frankie Martin

  8. KSC-2011-5546

    NASA Image and Video Library

    2011-07-13

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doors -- winds its way from Orbiter Processing Facility-2, or OPF-2, to the Vehicle Assembly Building, or VAB. Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html. Photo credit: NASA/Frankie Martin

  9. KSC-2011-5573

    NASA Image and Video Library

    2011-07-13

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doors -- is welcomed into the Vehicle Assembly Building, or VAB, after its roll from Orbiter Processing Facility-2, or OPF-2. Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html. Photo credit: NASA/Ken Thornsley

  10. KSC-2011-5550

    NASA Image and Video Library

    2011-07-13

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doors -- awaits entry into the Vehicle Assembly Building, or VAB, after rolling from Orbiter Processing Facility-2, or OPF-2. Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html. Photo credit: NASA/Frankie Martin

  11. KSC-2011-5572

    NASA Image and Video Library

    2011-07-13

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doors -- rolls out of Orbiter Processing Facility-2, or OPF-2, on its move to the Vehicle Assembly Building, or VAB. Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html. Photo credit: NASA/Ken Thornsley

  12. The Role of Laboratory Testing in Differentiating Type 1 Diabetes from Type 2 Diabetes in Patients Undergoing Bariatric Surgery.

    PubMed

    Pilla, Scott J; Maruthur, Nisa M; Schweitzer, Michael A; Magnuson, Thomas H; Potter, James J; Clark, Jeanne M; Lee, Clare J

    2018-01-01

    It may be difficult to distinguish between adults with type 1 diabetes and type 2 diabetes by clinical assessment. In patients undergoing bariatric surgery, it is critical to correctly classify diabetes subtype to prevent adverse perioperative outcomes including diabetic ketoacidosis. This study aimed to determine whether testing for C-peptide and islet cell antibodies during preoperative evaluation for bariatric surgery could improve the classification of type 1 versus type 2 diabetes compared to clinical assessment alone. This is a retrospective analysis of the Improving Diabetes through Lifestyle and Surgery trial, which randomized patients with clinically diagnosed type 2 diabetes and BMI 30-40 kg/m 2 to medical weight loss or bariatric surgery; one participant was discovered to have type 1 diabetes after experiencing postoperative diabetic ketoacidosis. Using blood samples collected prior to study interventions, we measured islet cell antibodies and fasting/meal-stimulated C-peptide in all participants. The participant with type 1 diabetes was similar to the 11 participants with type 2 diabetes in age at diagnosis, adiposity, and glycemic control but had the lowest C-peptide levels. Among insulin-treated participants, fasting and stimulated C-peptide correlated strongly with the C-peptide area-under-the-curve on mixed meal tolerance testing (R = 0.86 and 0.88, respectively). Three participants, including the one with type 1 diabetes, were islet cell antibody positive. Clinical characteristics did not correctly identify type 1 diabetes in this study. Preoperative C-peptide testing may improve diabetes classification in patients undergoing bariatric surgery; further research is needed to define the optimal C-peptide thresholds.

  13. The use of pre-test and post-test probability values as criteria before selecting patients to undergo coronary angiography in patients who have ischemic findings on myocardial perfusion scintigraphy

    PubMed Central

    Şen, Nazlı Pınar Karahan; Bekiş, Recep; Ceylan, Ali; Derebek, Erkan

    2016-01-01

    Objective: Myocardial perfusion scintigraphy (MPS) is a diagnostic test which is frequently used in the diagnosis of coronary heart disease (CHD). MPS is generally interpreted as ischemia present or absent; however, it has a power in predicting the disease, similar to other diagnostic tests. In this study, we aimed to assist in directing the high-risk patients to undergo coronary angiography (CA) primarily by evaluating patients without prior CHD history with pre-test and post-test probabilities. Methods: The study was designed as a retrospective study. Between January 2008 and July 2011, 139 patients with positive MPS results and followed by CA recently (<6 months) were evaluated from patient files. Patients’ pre-test probabilities based on the Diamond and Forrester method and the likelihood ratios that were obtained from the literature were used to calculate the patients’ post-exercise and post-MPS probabilities. Patients were evaluated in risk groups as low, intermediate, and high, and an ROC curve analysis was performed for the post-MPS probabilities. Results: Coronary artery stenosis (CAS) was determined in 59 patients (42.4%). A significant difference was determined between the risk groups according to CAS, both for the pre-test and post-test probabilities (p<0.001, p=0.024). The ROC analysis provided a cut-off value of 80.4% for post-MPS probability in predicting CAS with 67.9% sensitivity and 77.8% specificity. Conclusion: When the post-MPS probability is ≥80% in patients who have reversible perfusion defects on MPS, we suggest interpreting the MPS as “high probability positive” to improve the selection of true-positive patients to undergo CA, and these patients should be primarily recommended CA. PMID:27004704

  14. Webb Instrument Undergoes Alignment Testing

    NASA Image and Video Library

    2011-08-18

    The Mid-Infrared Instrument, a component of NASA James Webb Space Telescope, underwent alignment testing at the Science and Technology Facilities Council Rutherford Appleton Laboratory Space in Oxfordshire, England.

  15. Different dissecting orders of the pulmonary bronchus and vessels during right upper lobectomy are associated with surgical feasibility and postoperative recovery for lung cancer patients.

    PubMed

    Zhai, Hao-Ran; Yang, Xue-Ning; Nie, Qiang; Liao, Ri-Qiang; Dong, Song; Li, Wei; Jiang, Ben-Yuan; Yang, Jin-Ji; Zhou, Qing; Tu, Hai-Yan; Zhang, Xu-Chao; Wu, Yi-Long; Zhong, Wen-Zhao

    2017-06-27

    Right upper lobectomy (RUL) for lung cancer with different dissecting orders involves the most variable anatomical structures, but no studies have analyzed its effects on postoperative recovery. This study compared the conventional surgical approach, VAB (dissecting pulmonary vessels first, followed by the bronchus), and the alternative surgical approach, aBVA (dissecting the posterior ascending arterial branch first, followed by the bronchus and vessels) on improving surgical feasibility and postoperative recovery for lung cancer patients. According to the surgical approach, consecutive lung cancer patients undergoing RUL were grouped into aBVA and VAB cohorts. Their clinical, pathologic, and perioperative characteristics were collected to compare perioperative outcomes. Three hundred one patients were selected (109 in the aBVA cohort and 192 in the VAB cohort). The mean operation time was shorter in the aBVA cohort than in the VAB cohort (164 vs. 221 min, P < 0.001), and less blood loss occurred in the aBVA cohort (92 vs. 141 mL, P < 0.001). The rate of conversion to thoracotomy was lower in the aBVA cohort than in the VAB cohort (0% vs. 11.5%, P < 0.001). The mean duration of postoperative chest drainage was shorter in the aBVA cohort than in the VAB cohort (3.6 vs. 4.5 days, P = 0.001). The rates of postoperative complications were comparable (P = 0.629). The median overall survival was not arrived in both cohorts (P > 0.05). The median disease-free survival was comparable for all patients in the two cohorts (not arrived vs. 41.97 months) and for patients with disease recurrences (13.25 vs. 9.44 months) (both P > 0.05). The recurrence models in two cohorts were also comparable for patients with local recurrences (6.4% vs. 7.8%), distant metastases (10.1% vs. 8.3%), and both (1.8% vs. 1.6%) (all P > 0.05). Dissecting the right upper bronchus before turning over the lobe repeatedly and dissecting veins via the aBVA approach during RUL would

  16. The sensibility and specificity of cerebral oximetry, measured by INVOS - 4100, in patients undergoing carotid endarterectomy compared with awake testing.

    PubMed

    Stilo, F; Spinelli, F; Martelli, E; Pipitó, N; Barillà, D; De Caridi, G; Benedetto, F; Risitano, D; Noto, A; Messina, R; David, A

    2012-10-01

    Selective shunting during carotid endarterectomy (CEA) is advocated to reduce shunt-related stroke. Cerebral monitoring is essential for temporary carotid shunting. Many techniques are available for cerebral monitoring; however, none is superior to monitoring the patient's neurological status (awake testing) while performing the procedure under local anesthesia (LA). Cerebral oximetry (CO) has previously been used to show the adequacy of cerebral circulation in patients undergoing CEA. This investigation was designed to compare the performance of the INVOS-4100 cerebral oximeter and the neurologic functions, by means of detecting cerebral ischemia induced by carotid cross-clamping, in patients undergoing CEA under LA, namely cervical plexus block. Patients scheduled for CEA under LA were included. Patients converted to general anesthesia (GA) or other types of operations other than CEA were excluded from this study. We enrolled 100 consecutive patients from January 2009 to December 2010. Bilateral regional cerebrovascular oxygen saturation (rSO(2)) was monitored in all patients, in addition to the awake testing. Changes in rSO(2) following carotid artery clamping were recorded. A drop greater than 20% was considered as an indicator of cerebral ischemia that might predict the need for carotid shunting. Patients were only shunted based on the awake testing. Of the 100 patients undergoing CEA under LA, 9 showed a significant drop in rSO(2) (range: 22.6-32.8%, mean: 26.4%): only three of them required shunting, while the remaining 6 had no changes in consciousness after internal carotid artery (ICA) cross-clamping and it was not necessary to place a shunt (false positive). Compared to the preclamping values, a significant decrease in rSO(2) was found on the hemisphere of the operated side, while no significant change was observed contralaterally. Ninety-one patients had no significant changes of CO values: in 89 of them there was no consciousness deterioration, so we

  17. KENNEDY SPACE CENTER, FLA. - Framed between palm trees, solid rocket boosters loom above the Mobile Launcher Platform (MLP) as the crawler transporter slowly moves it along the crawlerway. The journey is in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-17

    KENNEDY SPACE CENTER, FLA. - Framed between palm trees, solid rocket boosters loom above the Mobile Launcher Platform (MLP) as the crawler transporter slowly moves it along the crawlerway. The journey is in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  18. KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, inch along the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A (on the horizon) and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-21

    KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, inch along the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A (on the horizon) and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  19. KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, inch along the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A (framed between the boosters), and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-21

    KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, inch along the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A (framed between the boosters), and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  20. KENNEDY SPACE CENTER, FLA. - The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, along the crawlerway in support of engineering analysis vibration tests on the crawler and MLP. In the distance, at left, is Launch Pad 39A. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-17

    KENNEDY SPACE CENTER, FLA. - The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, along the crawlerway in support of engineering analysis vibration tests on the crawler and MLP. In the distance, at left, is Launch Pad 39A. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  1. KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, crawls away from the Vehicle Assembly Building in support of the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-21

    KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, crawls away from the Vehicle Assembly Building in support of the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  2. KENNEDY SPACE CENTER, FLA. - Carrying a set of twin solid rocket boosters, the crawler transporter slowly moves the Mobile Launcher Platform (MLP) past the NASA-KSC News Center where the U.S. flag flies daily. The journey is in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-17

    KENNEDY SPACE CENTER, FLA. - Carrying a set of twin solid rocket boosters, the crawler transporter slowly moves the Mobile Launcher Platform (MLP) past the NASA-KSC News Center where the U.S. flag flies daily. The journey is in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  3. KENNEDY SPACE CENTER, FLA. - As the crawler transporter slowly moves the Mobile Launcher Platform (MLP) out of the Vehicle Assembly Building, the two solid rocket boosters on top are framed in the doorway. The move is in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-17

    KENNEDY SPACE CENTER, FLA. - As the crawler transporter slowly moves the Mobile Launcher Platform (MLP) out of the Vehicle Assembly Building, the two solid rocket boosters on top are framed in the doorway. The move is in support of engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  4. KENNEDY SPACE CENTER, FLA. - As the crawler transporter slowly moves the Mobile Launcher Platform (MLP) out of the Vehicle Assembly Building, the driver of the front control cab can be seen. The MLP is carrying two solid rocket boosters for engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-17

    KENNEDY SPACE CENTER, FLA. - As the crawler transporter slowly moves the Mobile Launcher Platform (MLP) out of the Vehicle Assembly Building, the driver of the front control cab can be seen. The MLP is carrying two solid rocket boosters for engineering analysis vibration tests on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  5. KSC-2011-5529

    NASA Image and Video Library

    2011-07-13

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery ventures out in public seemingly "undressed" -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doors. The shuttle is rolling from Orbiter Processing Facility-2, or OPF-2, to the Vehicle Assembly Building, or VAB. Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html. Photo credit: NASA/Jim Grossmann

  6. KSC-2011-5533

    NASA Image and Video Library

    2011-07-13

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doors -- has arrived at the door of the Vehicle Assembly Building, or VAB, from Orbiter Processing Facility-2, or OPF-2, in the background. Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html. Photo credit: NASA/Jim Grossmann

  7. KSC-2011-5545

    NASA Image and Video Library

    2011-07-13

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doors -- rolls past Orbiter Processing Facility-3, or OPF-3, at right, on its way from OPF-2 to the Vehicle Assembly Building, or VAB. Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html. Photo credit: NASA/Frankie Martin

  8. KSC-2011-5542

    NASA Image and Video Library

    2011-07-13

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doors -- rolls past the Thermal Protection System Facility, at right, on its way from Orbiter Processing Facility-2, or OPF-2, to the Vehicle Assembly Building, or VAB. Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html. Photo credit: NASA/Frankie Martin

  9. KSC-2011-5528

    NASA Image and Video Library

    2011-07-13

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery, as it is seldom seen in public -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doors -- rolls out of Orbiter Processing Facility-2, or OPF-2, on its way to the Vehicle Assembly Building, or VAB. Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html. Photo credit: NASA/Jim Grossmann

  10. KSC-2011-5532

    NASA Image and Video Library

    2011-07-13

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Discovery -- its nose encased in protective plastic, its cockpit windows covered, and strongbacks attached to its payload bay doors -- rolls past the Thermal Protection System Facility, at right, on its way from Orbiter Processing Facility-2, or OPF-2, to the Vehicle Assembly Building, or VAB. Discovery will be stored inside the VAB for approximately one month while shuttle Atlantis undergoes processing in OPF-2 following its final mission, STS-135. Discovery flew its 39th and final mission, STS-133, in February and March 2011, and currently is being prepared for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. For more information about Discovery's Transition and Retirement, visit www.nasa.gov/mission_pages/shuttle/launch/discovery_rss_collection_archive_1.html. Photo credit: NASA/Jim Grossmann

  11. KSC-00pp0716

    NASA Image and Video Library

    2000-06-01

    KENNEDY SPACE CENTER, FLA. -- A crawler-transporter with mobile launcher platform on top tests the buried portion of the Apollo-era crawlerway leading to the Vehicle Assembly Building (VAB) high bay 2 on the southwest side. The road was restored as part of KSC’s Safe Haven project. High bay 2 provides a third stacking area. The primary goal of the Safe Haven construction project was to strengthen readiness for hurricane season by expanding the VAB’s storage capacity. The new area, in high bay 2, will allow NASA to preassemble stacks and still have room in the VAB to pull a Shuttle back from the pad if severe weather threatens. Potential rollouts of the Space Shuttle to the launch pad from high bay 2 will involve making a turn around the north side of the VAB in contrast to the straight rollouts from high bays 1 and 3, on the east side of the VAB facing the launch pads

  12. KSC00pp0716

    NASA Image and Video Library

    2000-06-01

    KENNEDY SPACE CENTER, FLA. -- A crawler-transporter with mobile launcher platform on top tests the buried portion of the Apollo-era crawlerway leading to the Vehicle Assembly Building (VAB) high bay 2 on the southwest side. The road was restored as part of KSC’s Safe Haven project. High bay 2 provides a third stacking area. The primary goal of the Safe Haven construction project was to strengthen readiness for hurricane season by expanding the VAB’s storage capacity. The new area, in high bay 2, will allow NASA to preassemble stacks and still have room in the VAB to pull a Shuttle back from the pad if severe weather threatens. Potential rollouts of the Space Shuttle to the launch pad from high bay 2 will involve making a turn around the north side of the VAB in contrast to the straight rollouts from high bays 1 and 3, on the east side of the VAB facing the launch pads

  13. Platform C South Arrival

    NASA Image and Video Library

    2016-08-04

    A heavy load transport truck from Tillett Heavy Hauling in Titusville, Florida, arrives at the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida, carrying a section of the first half of the C-level work platforms, C south, for the agency’s Space Launch System (SLS) rocket. The platform will be delivered to the VAB staging area in the west parking lot. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft and provide access for testing and processing.

  14. Quantity Distance for the Kennedy Space Center Vehicle Assembly Building for Solid Propellant Fueled Launchers

    NASA Technical Reports Server (NTRS)

    Stover, Steven; Diebler, Corey; Frazier, Wayne

    2006-01-01

    The NASA KSC VAB was built to process Apollo launchers in the 1960's, and later adapted to process Space Shuttles. The VAB has served as a place to assemble solid rocket motors (5RM) and mate them to the vehicle's external fuel tank and Orbiter before rollout to the launch pad. As Space Shuttle is phased out, and new launchers are developed, the VAB may again be adapted to process these new launchers. Current launch vehicle designs call for continued and perhaps increased use of SRM segments; hence, the safe separation distances are in the process of being re-calculated. Cognizant NASA personnel and the solid rocket contractor have revisited the above VAB QD considerations and suggest that it may be revised to allow a greater number of motor segments within the VAB. This revision assumes that an inadvertent ignition of one SRM stack in its High Bay need not cause immediate and complete involvement of boosters that are part of a vehicle in adjacent High Bay. To support this assumption, NASA and contractor personnel proposed a strawman test approach for obtaining subscale data that may be used to develop phenomenological insight and to develop confidence in an analysis model for later use on full-scale situations. A team of subject matter experts in safety and siting of propellants and explosives were assembled to review the subscale test approach and provide options to NASA. Upon deliberations regarding the various options, the team arrived at some preliminary recommendations for NASA.

  15. Platform C South Arrival

    NASA Image and Video Library

    2016-08-04

    A heavy load transport truck from Tillett Heavy Hauling in Titusville, Florida, arrives at the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida, carrying a section of the first half of the C-level work platforms, C South, for the agency’s Space Launch System (SLS) rocket. The platform is being lifted and transferred onto support stands in the VAB staging area in the west parking lot. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft and provide access for testing and processing.

  16. Platform C South Arrival

    NASA Image and Video Library

    2016-08-05

    A heavy load transport truck from Tillett Heavy Hauling in Titusville, Florida, arrives at the Vehicle Assembly Building (VAB) at NASA’s Kennedy Space Center in Florida, carrying the second section of the first half of the C-level work platforms, C South, for the agency’s Space Launch System (SLS) rocket. The platform will be offloaded in the VAB staging area in the west parking lot. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft and provide access for testing and processing.

  17. Workers in the VAB test SRB cables on STS-98 solid rocket boosters

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- United Space Alliance SRB technician Richard Bruns attaches a cable end cover to a cable pulled from the solid rocket booster on Space Shuttle Atlantis. The Shuttle was rolled back from Launch Pad 39A in order to conduct tests on the SRB cables. A prior extensive evaluation of NASA'''s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6.

  18. Workers in the VAB test SRB cables on STS-98 solid rocket boosters

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- NASA and United Space Alliance SRB technicians hook up solid rocket booster cables to a Cirris Signature Touch 1 cable tester. From left are Loren Atkinson and Steve Swichkow, with NASA, and Jeff Suter, with USA. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA'''s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6.

  19. Workers in the VAB test SRB cables on STS-98 solid rocket boosters

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- In the Vehicle Assembly Building, United Space Alliance SRB technician Frank Meyer pulls cables out of the solid rocket booster system tunnel. Cable end covers are in a box near his feet. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA'''s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6.

  20. Wide range operation of advanced low NOx combustors for supersonic high-altitude aircraft gas turbines

    NASA Technical Reports Server (NTRS)

    Roberts, P. B.; Fiorito, R. J.

    1977-01-01

    An initial rig program tested the Jet Induced Circulation (JIC) and Vortex Air Blast (VAB) systems in small can combustor configurations for NOx emissions at a simulated high altitude, supersonic cruise condition. The VAB combustor demonstrated the capability of meeting the NOx goal of 1.0 g NO2/kg fuel at the cruise condition. In addition, the program served to demonstrate the limited low-emissions range available from the lean, premixed combustor. A follow-on effort was concerned with the problem of operating these lean, premixed combustors with acceptable emissions at simulated engine idle conditions. Various techniques have been demonstrated that allow satisfactory operation on both the JIC and VAB combustors at idle with CO emissions below 20 g/kg fuel. The VAB combustor was limited by flashback/autoignition phenomena at the cruise conditions to a pressure of 8 atmospheres. The JIC combustor was operated up to the full design cruise pressure of 14 atmospheres without encountering an autoignition limitation although the NOx levels, in the 2-3 g NO2/kg fuel range, exceeded the program goal.

  1. KENNEDY SPACE CENTER, FLA. - A Kennedy Space Center technician walks towards the intersection of the crawlerway beside a crawler-transporter moving Mobile Launcher Platform (MLP) number 3, with a set of twin solid rocket boosters bolted atop, during the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A, and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-21

    KENNEDY SPACE CENTER, FLA. - A Kennedy Space Center technician walks towards the intersection of the crawlerway beside a crawler-transporter moving Mobile Launcher Platform (MLP) number 3, with a set of twin solid rocket boosters bolted atop, during the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A, and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  2. KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, inch along the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A (on the horizon at right; Pad 39B is at far left), and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-21

    KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, inch along the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A (on the horizon at right; Pad 39B is at far left), and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  3. Workers in the VAB test SRB cables on STS-98 solid rocket boosters

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- Working near the top of a solid rocket booster, NASA and United Space Alliance SRB technicians hook up SRB cables to a Cirris Signature Touch 1 cable tester. From left are Steve Swichkow, with NASA, and Jim Silviano (back to camera) and Jeff Suter, with USA. The SRB is part of Space Shuttle Atlantis, rolled back from Launch Pad 39A in order to conduct tests on the cables. A prior extensive evaluation of NASA'''s SRB cable inventory on the shelf revealed conductor damage in four (of about 200) cables. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching. Workers are conducting inspections, making continuity checks and conducting X-ray analysis on the cables. The launch has been rescheduled no earlier than Feb. 6.

  4. Oxygen desaturation in healthy subjects undergoing the incremental shuttle walk test*

    PubMed Central

    Seixas, Daniel Machado; Seixas, Daniela Miti Tsukumo; Pereira, Monica Corso; Moreira, Marcos Mello; Paschoal, Ilma Aparecida

    2013-01-01

    OBJECTIVE: To determine the probability of oxygen desaturation in healthy individuals undergoing the incremental shuttle walk test (ISWT). METHODS: We enrolled 83 healthy subjects: 55 males (including 1 smoker) and 28 females. We determined pre-ISWT FEV1, FEV6, HR and SpO2, as well as post-ISWT HR and SpO2. RESULTS: Mean values overall were as follows: age, 35.05 ± 12.53 years; body mass index, 24.30 ± 3.47 kg/m2; resting HR, 75.12 ± 12.48 bpm; resting SpO2, 97.96 ± 1.02%; FEV1, 3.75 ± 0.81 L; FEV6, 4.45 ± 0.87 L; FEV1/FEV6 ratio, 0.83 ± 0.08 (no restriction or obstruction); incremental shuttle walk distance, 958.30 ± 146.32 m; post-ISWT HR, 162.41 ± 18.24 bpm; and post-ISWT SpO2, 96.27 ± 2.21%. In 11 subjects, post-ISWT SpO2 was higher than was pre-ISWT SpO2. In 17 subjects, there was a 4% decrease in SpO2 after the ISWT. There were no statistically significant differences between the groups with and without post-ISWT oxygen desaturation in terms of age, gender, FEV1, FEV6, FEV1/FEV6, pre-ISWT SpO2, incremental shuttle walk distance, HR, or percentage of maximal HR. In the individuals with post-ISWT oxygen desaturation, the body mass index was higher (p = 0.01) and post-ISWT SpO2 was lower (p = 0.0001). CONCLUSIONS: Healthy individuals can present oxygen desaturation after the ISWT. Using the ISWT to predict subtle respiratory abnormalities can be misleading. In healthy subjects, oxygen desaturation is common after the ISWT, as it is during any intense physical activity. PMID:24068265

  5. Providing Quantitative Information and a Nudge to Undergo Stool Testing in a Colorectal Cancer Screening Decision Aid: A Randomized Clinical Trial.

    PubMed

    Schwartz, Peter H; Perkins, Susan M; Schmidt, Karen K; Muriello, Paul F; Althouse, Sandra; Rawl, Susan M

    2017-08-01

    Guidelines recommend that patient decision aids should provide quantitative information about probabilities of potential outcomes, but the impact of this information is unknown. Behavioral economics suggests that patients confused by quantitative information could benefit from a "nudge" towards one option. We conducted a pilot randomized trial to estimate the effect sizes of presenting quantitative information and a nudge. Primary care patients (n = 213) eligible for colorectal cancer screening viewed basic screening information and were randomized to view (a) quantitative information (quantitative module), (b) a nudge towards stool testing with the fecal immunochemical test (FIT) (nudge module), (c) neither a nor b, or (d) both a and b. Outcome measures were perceived colorectal cancer risk, screening intent, preferred test, and decision conflict, measured before and after viewing the decision aid, and screening behavior at 6 months. Patients viewing the quantitative module were more likely to be screened than those who did not ( P = 0.012). Patients viewing the nudge module had a greater increase in perceived colorectal cancer risk than those who did not ( P = 0.041). Those viewing the quantitative module had a smaller increase in perceived risk than those who did not ( P = 0.046), and the effect was moderated by numeracy. Among patients with high numeracy who did not view the nudge module, those who viewed the quantitative module had a greater increase in intent to undergo FIT ( P = 0.028) than did those who did not. The limitations of this study were the limited sample size and single healthcare system. Adding quantitative information to a decision aid increased uptake of colorectal cancer screening, while adding a nudge to undergo FIT did not increase uptake. Further research on quantitative information in decision aids is warranted.

  6. Screening Women Aged 50-59 for CRC Using Fecal Occult Blood Test Produces Outcomes Similar to Men Undergoing Screening Colonoscopy.

    PubMed

    Mooers, Harrison M; Holub, Jennifer L; Lieberman, David A

    2018-06-13

    Average-risk women aged 50-59 years have a lower incidence and mortality of colorectal cancer relative to age-matched men, calling into question the benefit of screening colonoscopy in this age group. We aimed to determine whether FOBT is an effective initial screening test in 50-59-year-old women. We conducted a cross-sectional study using a computerized endoscopic report generator. We identified 320,906 individuals who had average-risk screening colonoscopy and 32,369 who had colonoscopy for positive FOBT. The primary outcome was the positive predictive value (PPV) of FOBT for large polyp(s) greater than 9 mm, as a surrogate for advanced neoplasia. Among patients aged 50-59 years undergoing screening colonoscopy, men were more likely than women to have large polyps (6.3 vs 4.2%, p < 0.0001). Black women undergoing screening colonoscopy had higher rates of large polyps compared to non-Black women. The PPV in FOBT-positive men aged 50-54 (11.5%) and 55-59 (14.4%) was higher than in women aged 50-54 (6.1%) and 55-59 (5.4%). Despite this lower PPV, women aged 50-54 with a positive FOBT had a similar rate of large polyps as 50-54-year-old men undergoing screening colonoscopy (6.1 vs 6.3%, p = 0.626). CRC screening with FOBT identifies 50-59-year-old men and women with a higher risk of large polyps. Since younger women have a lower risk of large polyps than men, screening with FOBT in 50-59-year-old non-Black women could be an effective screening strategy, with outcomes similar to the use of screening colonoscopy in 50-59-year-old men.

  7. Evolution of an adaptive behavior and its sensory receptors promotes eye regression in blind cavefish: response to Borowsky (2013).

    PubMed

    Yoshizawa, Masato; O'Quin, Kelly E; Jeffery, William R

    2013-07-11

    Vibration attraction behavior (VAB) is the swimming of fish toward an oscillating object, a behavior that is likely adaptive because it increases foraging efficiency in darkness. VAB is seen in a small proportion of Astyanax surface-dwelling populations (surface fish) but is pronounced in cave-dwelling populations (cavefish). In a recent study, we identified two quantitative trait loci for VAB on Astyanax linkage groups 2 and 17. We also demonstrated that a small population of superficial neuromast sensors located within the eye orbit (EO SN) facilitate VAB, and two quantitative trait loci (QTL) were identified for EO SN that were congruent with those for VAB. Finally, we showed that both VAB and EO SN are negatively correlated with eye size, and that two (of several) QTL for eye size overlap VAB and EO SN QTLs. From these results, we concluded that the adaptive evolution of VAB and EO SN has contributed to the indirect loss of eyes in cavefish, either as a result of pleiotropy or tight physical linkage of the mutations underlying these traits. In a subsequent commentary, Borowsky argues that there is poor experimental support for our conclusions. Specifically, Borowsky states that: (1) linkage groups (LGs) 2 and 17 harbor QTL for many traits and, therefore, no evidence exists for an exclusive interaction among the overlapping VAB, EO SN and eye size QTL; (2) some of the QTL we identified are too broad (>20 cM) to support the hypothesis of correlated evolution due to pleiotropy or hitchhiking; and (3) VAB is unnecessary to explain the indirect evolution of eye-loss since the negative polarity of numerous eye QTL is consistent with direct selection against eyes. Borowsky further argues that (4) it is difficult to envision an evolutionary scenario whereby VAB and EO SN drive eye loss, since the eyes must first be reduced in order to increase the number of EO SN and, therefore, VAB. In this response, we explain why the evidence of one trait influencing eye reduction

  8. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    NASA’s upgraded crawler-transporter 2 (CT-2) begins its trek from the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida to Launch Pad 39B to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the VAB. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  9. Cerebroprotective effect of piracetam in patients undergoing open heart surgery.

    PubMed

    Holinski, Sebastian; Claus, Benjamin; Alaaraj, Nour; Dohmen, Pascal Maria; Neumann, Konrad; Uebelhack, Ralf; Konertz, Wolfgang

    2011-01-01

    Reduction of cognitive function is a possible side effect after the use of cardiopulmonary bypass (CPB) during cardiac surgery. Since it has been proven that piracetam is cerebroprotective in patients undergoing coronary bypass surgery, we investigated the effects of piracetam on the cognitive performance of patients undergoing open heart surgery. Patients scheduled for elective open heart surgery were randomized to the piracetam or placebo group in a double-blind study. Patients received 12 g of piracetam or placebo at the beginning of the operation. Six neuropsychological subtests from the Syndrom Kurz Test and the Alzheimer's Disease Assessment Scale were performed preoperatively and on day 3, postoperatively. To assess the overall cognitive function and the degree of cognitive decline across all tests after the surgery, we combined the six test-scores by principal component analysis. A total of 88 patients with a mean age of 67 years were enrolled into the study. The mean duration of CPB was 110 minutes. Preoperative clinical parameters and overall cognitive functions were not significantly different between the groups. The postoperative combined score of the neuropsychological tests showed deterioration of cognitive function in both groups (piracetam: preoperative 0.19 ± 0.97 vs. postoperative -0.97 ± 1.38, p <0.0005 and placebo: preoperative -0.14 ± 0.98 vs. postoperative -1.35 ± 1.23, p <0.0005). Patients taking piracetam did not perform better than those taking placebo, and both groups had the same decline of overall cognitive function (p = 0.955). Piracetam had no cerebroprotective effect in patients undergoing open heart surgery. Unlike the patients who underwent coronary surgery, piracetam did not reduce the early postoperative decline of neuropsychological abilities in heart valve patients.

  10. KSC-04PD-2687

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. A shipping container transporting part of the new Orbiter Boom Sensor System (OBSS) is delivered by truck to the Remote Manipulator System lab in the Vehicle Assembly Building (VAB). Once the entire structure has arrived, the OBSS will be assembled and undergo final checkout and testing in the lab prior to being transferred to the Orbiter Processing Facility (OPF) for installation on Space Shuttle Discovery. The 50-foot-long OBSS will be attached to the Remote Manipulator System, or Shuttle arm, and is one of the new safety measures for Return to Flight, equipping the orbiter with cameras and laser systems to inspect the Shuttle's Thermal Protection System while in space. Discovery is slated to fly mission STS-114 once Space Shuttle launches resume. The launch planning window is May 12 to June 3, 2005.

  11. KSC-04PD-2689

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. A shipping container housing part of the new Orbiter Boom Sensor System (OBSS) is lifted from a truck into the Remote Manipulator System lab in the Vehicle Assembly Building (VAB). Once the entire structure has arrived, the OBSS will be assembled and undergo final checkout and testing in the lab prior to being transferred to the Orbiter Processing Facility (OPF) for installation on Space Shuttle Discovery. The 50-foot- long OBSS will be attached to the Remote Manipulator System, or Shuttle arm, and is one of the new safety measures for Return to Flight, equipping the orbiter with cameras and laser systems to inspect the Shuttle's Thermal Protection System while in space. Discovery is slated to fly mission STS-114 once Space Shuttle launches resume. The launch planning window is May 12 to June 3, 2005.

  12. KSC-99pp1133

    NASA Image and Video Library

    1999-09-20

    The Butler Building at Kennedy Space Center is nearly demolished, with the help of the crane in the background. The building, which is near the Orbiter Processing Facility (right), is being demolished in order to extend the crawlerway leading to the high bay of the Vehicle Assembly Building (VAB), part of KSC's Safe Haven project. The goal of Safe Haven is to strengthen readiness for Florida's hurricane season by expanding the VAB's storage capacity. Construction includes outfitting the VAB with a third stacking area, in high bay 2, that will allow NASA to preassemble stacks and still have room in the VAB to pull a Shuttle back from the pad into the safety of the VAB if severe weather threatens. The VAB can withstand winds up to 125 mph

  13. KSC-99pp1132

    NASA Image and Video Library

    1999-09-20

    The walls of the Butler Building at Kennedy Space Center come tumbling down, with the help of the crane in the background. The building, which is near the Orbiter Processing Facility, is being demolished in order to extend the crawlerway leading to the high bay of the Vehicle Assembly Building (VAB), part of KSC's Safe Haven project. The goal of Safe Haven is to strengthen readiness for Florida's hurricane season by expanding the VAB's storage capacity. Construction includes outfitting the VAB with a third stacking area, in high bay 2, that will allow NASA to preassemble stacks and still have room in the VAB to pull a Shuttle back from the pad into the safety of the VAB if severe weather threatens. The VAB can withstand winds up to 125 mph

  14. Republic P-47G Thunderbolt Undergoes Ground Testing

    NASA Image and Video Library

    1945-06-21

    A Republic P-47G Thunderbolt is tested with a large blower on the hangar apron at the National Advisory Committee for Aeronautics (NACA) Aircraft Engine Research Laboratory in Cleveland, Ohio. The blower could produce air velocities up to 250 miles per hour. This was strong enough to simulate take-off power and eliminated the need to risk flights with untried engines. The Republic P-47G was loaned to the laboratory to test NACA modifications to the Wright R-2800 engine’s cooling system at higher altitudes. The ground-based tests, seen here, were used to map the engine’s normal operating parameters. The P-47G then underwent an extensive flight test program to study temperature distribution among the engine’s 18 cylinders and develop methods to improve that distribution.

  15. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    NASA’s upgraded crawler-transporter 2 (CT-2) has exited the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida for its trek along the crawlerway to Launch Pad 39B to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the VAB. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  16. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    Technicians walk alongside NASA’s upgraded crawler-transporter 2 (CT-2) as it continues the trek on the crawlerway from the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida to Launch Pad 39B to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the VAB. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  17. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    Technicians walk alongside NASA’s upgraded crawler-transporter 2 (CT-2) as it continues the trek along the crawlerway from the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida to Launch Pad 39B to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the VAB. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  18. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    NASA’s upgraded crawler-transporter 2 (CT-2) travels along the crawlerway from the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida on its trek to Launch Pad 39B to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the VAB. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  19. Cabana Multi-User Spaceport Tour of KSC

    NASA Image and Video Library

    2017-02-17

    Members of the news media view the 10 levels of new work platforms in High Bay 3 inside the Vehicle Assembly Building (VAB) during a tour of NASA's Kennedy Space Center in Florida with Center Director Bob Cabana. The final platform, A north, was recently installed. The platforms will surround the Space Launch System and Orion spacecraft on the mobile launcher during processing to prepare for the first test flight. The Ground Systems Development and Operations Program is overseeing upgrades to the VAB, including installation of the new work platforms.

  20. Hair and urine testing to assess drugs of abuse consumption in couples undergoing assisted reproductive technology (ART).

    PubMed

    Pichini, Simona; De Luca, Roberto; Pellegrini, Manuela; Marchei, Emilia; Rotolo, Maria Concetta; Spoletini, Roberta; D'Aloja, Paola; Pacifici, Roberta; Mortali, Claudia; Scaravelli, Giulia

    2012-05-10

    For the first time in Europe hair and urine testing have been applied to assess drugs of abuse consumption in couples undergoing assisted reproductive technology and the eventual association of toxic habits with other lifestyle, health status and sociodemographic factors was also investigated. Couples attending five assisted reproduction centers in Rome were invited to join the study. When they presented at the Centre for the visit, they were asked to answer a structured questionnaire concerning sociodemographic characteristics and lifestyle habits, and at the same time to provide hair and urine samples. Hair and urine testing for drugs of abuse, urinary profile of principal endogenous steroids involved in fertility process (testosterone, epitestosterone, androsterone, etiocholanolone and dehydroepiandrosterone) and of alcohol and tobacco smoke biomarkers were performed with validated methodologies. Of the 594 enrolled individuals (297 couples), 352 (164 couples and 24 single individuals from the couple) completed the questionnaire and gave both hair and urine samples, apart from 3 bald men, who only gave urine samples. Urine testing showed an overall 4.8% (17 individuals) positivity to drugs of abuse: 4.2% to cannabinoids, 1.4% to cocaine and 0.85% to both drugs. Results of 4cm segment hair samples testing matched those from urine samples. Thus, taking together, results of urine and hair testing confirmed repeated use of cannabis, cocaine and both drugs in 3.7, 0.85 and 0.57% examined individuals, respectively. Drug consumers were in a statistically higher percentage active smokers and alcohol drinkers, less prone to physical activity and with a trend towards higher weight than non consumers. Finally, repeated drug consumption was associated with significant lower concentration of urinary testosterone in males and of urinary dehydroepiandrosterone in females. The findings of the present study confirm the suitability of urine testing to disclose recent drugs of

  1. KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters bolted to it, atop the crawler-transporter, crawl to the intersection in the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. In the background are Launch Pads 39A (right) and 39B (left). The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-21

    KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters bolted to it, atop the crawler-transporter, crawl to the intersection in the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. In the background are Launch Pads 39A (right) and 39B (left). The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  2. KENNEDY SPACE CENTER, FLA. - A Kennedy Space Center technician monitors the performance of a crawler-transporter as it moves Mobile Launcher Platform (MLP) number 3, with a set of twin solid rocket boosters bolted atop, to the intersection in the crawlerway during the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A, and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-21

    KENNEDY SPACE CENTER, FLA. - A Kennedy Space Center technician monitors the performance of a crawler-transporter as it moves Mobile Launcher Platform (MLP) number 3, with a set of twin solid rocket boosters bolted atop, to the intersection in the crawlerway during the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A, and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  3. KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters bolted to it, atop the crawler-transporter, inches along the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. The MLP is viewed from the KSC News Center across the turn basin. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-21

    KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters bolted to it, atop the crawler-transporter, inches along the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. The MLP is viewed from the KSC News Center across the turn basin. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  4. KENNEDY SPACE CENTER, FLA. - Seen across the water of the Launch Complex 39 turn basin, a crawler-transporter, carrying Mobile Launcher Platform (MLP) number 3 with a set of twin solid rocket boosters bolted atop, crawls out of the 525-foot-tall Vehicle Assembly Building during the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-21

    KENNEDY SPACE CENTER, FLA. - Seen across the water of the Launch Complex 39 turn basin, a crawler-transporter, carrying Mobile Launcher Platform (MLP) number 3 with a set of twin solid rocket boosters bolted atop, crawls out of the 525-foot-tall Vehicle Assembly Building during the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  5. Tolerability of 2.5% Lidocaine/Prilocaine Hydrogel in Children Undergoing Cryotherapy for Molluscum Contagiosum.

    PubMed

    Gobbato, André A M; Babadópulos, Tainah; Gobbato, Cintia A R S; Moreno, Ronilson A; Gagliano-Jucá, Thiago; De Nucci, Gilberto

    2016-05-01

    The tolerability of a 2.5% lidocaine/prilocaine hydrogel (Nanorap, Biolab Indústria Farmacêutica Ltd., Sao Paulo, Brazil) was evaluated in 20 children ages 2 to 11 years undergoing cryotherapy for molluscum contagiosum (MC). The product was well tolerated, with only two children presenting with eczema at the application site. These adverse reactions were considered unlikely to be related to the test product, because a patch test was negative in one of the individuals and the other event occurred in only one of the two treated areas. Nanorap is an efficacious and well-tolerated option for topical anesthesia in children undergoing cryotherapy for MC. © 2016 Wiley Periodicals, Inc.

  6. A rationale for biopsying embryos reaching the morula stage on Day 6 in women undergoing preimplantation genetic testing for aneuploidy.

    PubMed

    Irani, M; Zaninovic, N; Canon, C; O'Neill, C; Gunnala, V; Zhan, Q; Palermo, G; Reichman, D; Rosenwaks, Z

    2018-05-01

    Is there a benefit to assessing ploidy in delayed embryos reaching the morula stage on Day 6 of development? Day-6 morulae should be considered for biopsy in women <40 years old undergoing preimplantation genetic testing for aneuploidy (PGT-A) because they are associated with acceptable, albeit reduced, euploidy and implantation rates (IRs). Embryo development and morphology have been shown to correlate with aneuploidy and pregnancy rates. During PGT-A cycles, embryos are biopsied if they reach the blastocyst stage by Day 5 or 6, whereas slow-developing embryos are typically deselected and discarded. Determining the viability of slow-developing embryos is particularly relevant for women undergoing PGT-A who have diminished ovarian reserve and a relatively low blastocyst yield. This is a retrospective cohort study that was performed at an academic medical center. Patients who underwent IVF with PGT-A were reviewed for inclusion. A total of 1615 cycles were reviewed. All cycles which involved a biopsy of a cavitating or compacted morula on Day 6 were included (n = 763). PGT-A was performed using array comparative genomic hybridization. The aneuploidy and implantation of morulae were compared to those of blastocysts originating from the same couples. The study included 763 cycles in which 1260 morulae and 3014 blastocysts were biopsied. Women were divided into four age groups (<35, 35-37, 38-39 and ≥40 years): the prevalence of aneuploidy was consistently lower among blastocysts (40.3, 50.8, 56 and 78.3%, respectively) than among compacted morulae (68.7, 75.5, 88.9 and 98.1%, respectively) and cavitating morulae (57, 66.4, 81 and 91.6%, respectively) throughout the different age groups (P < 0.001). Of note, the majority of compacted morulae (98.1%) and cavitating morulae (91.6%) were aneuploid in women aged ≥40 years. Compacted and cavitating morulae had significantly higher rates of complex aneuploidy, which involves ≥3 chromosomes, compared with blastocysts (P

  7. Pulmonary function tests do not predict mortality in patients undergoing continuous-flow left ventricular assist device implantation.

    PubMed

    Bedzra, Edo K S; Dardas, Todd F; Cheng, Richard K; Pal, Jay D; Mahr, Claudius; Smith, Jason W; Shively, Kent; Masri, S Carolina; Levy, Wayne C; Mokadam, Nahush A

    2017-12-01

    To investigate the effect of pulmonary function testing on outcomes after continuous flow left ventricular assist device implantation. A total of 263 and 239 patients, respectively, had tests of forced expiratory volume in 1 second and diffusing capacity of the lungs for carbon monoxide preoperatively for left ventricular assist device implantations between July 2005 and September 2015. Kaplan-Meier analysis and multivariable Cox regressions were performed to evaluate mortality. Patients were analyzed in a single cohort and across 5 groups. Postoperative intensive care unit and hospital lengths of stay were evaluated with negative binomial regressions. There is no association of forced expiratory volume in 1 second and diffusing capacity of the lungs for carbon monoxide with survival and no difference in mortality at 1 and 3 years between the groups (log rank P = .841 and .713, respectively). Greater values in either parameter were associated with decreased hospital lengths of stay. Only diffusing capacity of the lungs for carbon monoxide was associated with increased intensive care unit length of stay in the group analysis (P = .001). Ventilator times, postoperative pneumonia, reintubation, and tracheostomy rates were similar across the groups. Forced expiratory volume in 1 second and diffusing capacity of the lungs for carbon monoxide are not associated with operative or long-term mortality in patients undergoing continuous flow left ventricular assist device implantation. These findings suggest that these abnormal pulmonary function tests alone should not preclude mechanical circulatory support candidacy. Copyright © 2017 The American Association for Thoracic Surgery. Published by Elsevier Inc. All rights reserved.

  8. STS-79 Atlantis rolls back to the VAB (flag in foreground)

    NASA Technical Reports Server (NTRS)

    1996-01-01

    The Space Shuttle Atlantis passes by the Turn Basin and the American flag at the Press Site, in foreground, en route to the Vehicle Assembly Building, where it will be sheltered from the threat of Hurricane Fran. Atlantis is rolling back from Launch Pad 39A, where it was undergoing preparations for Mission STS-79. This marks the second rollback for Atlantis since July because of hurricane threats. The threat of Hurricane Bertha forced the rollback of Atlantis in July. Atlantis currently is scheduled for launch on the fourth Shuttle-Mir docking mission around mid- September.

  9. BRCA1 and BRCA2 mutations in women of different ethnicities undergoing testing for hereditary breast-ovarian cancer

    PubMed Central

    Hall, Michael J.; Reid, Julia E.; Burbidge, Lynn A.; Pruss, Dmitry; Deffenbaugh, Amie M.; Frye, Cynthia; Wenstrup, Richard J.; Ward, Brian E.; Scholl, Thomas A.; Noll, Walter W.

    2009-01-01

    Background In women at increased risk for breast and ovarian cancer, the identification of a BRCA1/2 mutation has important implications for screening and prevention counseling. Uncertainty regarding the role of BRCA1/2 testing in high-risk women from diverse ancestral backgrounds exists due to variability in prevalence estimates of deleterious (disease-associated) mutations in non-White populations. We examined the prevalence of BRCA1/2 mutations in an ethnically diverse group of women referred for genetic testing. Methods We conducted a cross-sectional analysis to assess the prevalence of BRCA1/2 mutations in a group of non-Ashkenazi Jewish women undergoing genetic testing. Results From 1996-2006, 46,276 women meeting study criteria underwent DNA full-sequence analysis of the BRCA1 and BRCA2 genes. Deleterious mutations were identified in 12.5% of subjects, and recurrent deleterious mutations (prevalence > 2%) were identified in all ancestral groups. Women of non-European descent were younger (45.9 yrs, SD11.6) than European (50.0 yrs, SD11.9)(p<0.001). Women of African (15.6%)[OR 1.3(1.1-1.5)] and Latin American (14.8%)[OR 1.2(1.1-1.4)] ancestries had a significantly higher prevalence of deleterious BRCA1/2 mutations compared to women of Western European ancestry (12.1%), primarily due to an increased prevalence of BRCA1 mutations in these two groups. Non-European ethnicity was strongly associated with having a variant of uncertain significance; however, re-classification decreased variant reporting (12.8%→5.9%), with women of African ancestry experiencing the largest decline (58%). Conclusions Mutation prevalence is high among women referred for clinical BRCA1/2 testing, and risk is similar across diverse ethnicities. BRCA1/2 testing is integral to cancer risk assessment in all high-risk women. PMID:19241424

  10. KENNEDY SPACE CENTER, FLA. -Crawler-transporter (CT) number 2, moves away from the Vehicle Assembly Building, with a Mobile Launcher Platform on top, on a test run to the launch pad. The CT recently underwent modifications to the cab. The CT moves Space Shuttle vehicles between the VAB and launch pad. Moving on four double-tracked crawlers, the CT uses a laser guidance system and a leveling system for the journey that keeps the top of a Space Shuttle vertical within plus- or minus-10 minutes of arc. The system enables the CT-MLP-Shuttle to negotiate the ramp leading to the launch pads and keep the load level. Unloaded, the CT weighs 6 million pounds.

    NASA Image and Video Library

    2003-08-18

    KENNEDY SPACE CENTER, FLA. -Crawler-transporter (CT) number 2, moves away from the Vehicle Assembly Building, with a Mobile Launcher Platform on top, on a test run to the launch pad. The CT recently underwent modifications to the cab. The CT moves Space Shuttle vehicles between the VAB and launch pad. Moving on four double-tracked crawlers, the CT uses a laser guidance system and a leveling system for the journey that keeps the top of a Space Shuttle vertical within plus- or minus-10 minutes of arc. The system enables the CT-MLP-Shuttle to negotiate the ramp leading to the launch pads and keep the load level. Unloaded, the CT weighs 6 million pounds.

  11. Inspiratory Muscle Training and Functional Capacity in Patients Undergoing Cardiac Surgery.

    PubMed

    Cordeiro, André Luiz Lisboa; de Melo, Thiago Araújo; Neves, Daniela; Luna, Julianne; Esquivel, Mateus Souza; Guimarães, André Raimundo França; Borges, Daniel Lago; Petto, Jefferson

    2016-04-01

    Cardiac surgery is a highly complex procedure which generates worsening of lung function and decreased inspiratory muscle strength. The inspiratory muscle training becomes effective for muscle strengthening and can improve functional capacity. To investigate the effect of inspiratory muscle training on functional capacity submaximal and inspiratory muscle strength in patients undergoing cardiac surgery. This is a clinical randomized controlled trial with patients undergoing cardiac surgery at Instituto Nobre de Cardiologia. Patients were divided into two groups: control group and training. Preoperatively, were assessed the maximum inspiratory pressure and the distance covered in a 6-minute walk test. From the third postoperative day, the control group was managed according to the routine of the unit while the training group underwent daily protocol of respiratory muscle training until the day of discharge. 50 patients, 27 (54%) males were included, with a mean age of 56.7±13.9 years. After the analysis, the training group had significant increase in maximum inspiratory pressure (69.5±14.9 vs. 83.1±19.1 cmH2O, P=0.0073) and 6-minute walk test (422.4±102.8 vs. 502.4±112.8 m, P=0.0031). We conclude that inspiratory muscle training was effective in improving functional capacity submaximal and inspiratory muscle strength in this sample of patients undergoing cardiac surgery.

  12. Evolution of the developmental plasticity and a coupling between left mechanosensory neuromasts and an adaptive foraging behavior.

    PubMed

    Fernandes, Vânia Filipa Lima; Macaspac, Christian; Lu, Louise; Yoshizawa, Masato

    2018-05-18

    development, but it was not seen in surface fish under any conditions tested, suggesting this laterality emerged through an evolutionary process. Above all, cavefish showed higher developmental plasticity in neuromast number and bone formation, and they showed an asymmetric correlation between the number of left-right neuromasts and VAB. Published by Elsevier Inc.

  13. C. elegans and mutants with chronic nicotine exposure as a novel model of cancer phenotype.

    PubMed

    Kanteti, Rajani; Dhanasingh, Immanuel; El-Hashani, Essam; Riehm, Jacob J; Stricker, Thomas; Nagy, Stanislav; Zaborin, Alexander; Zaborina, Olga; Biron, David; Alverdy, John C; Im, Hae Kyung; Siddiqui, Shahid; Padilla, Pamela A; Salgia, Ravi

    2016-01-01

    We previously investigated MET and its oncogenic mutants relevant to lung cancer in C. elegans. The inactive orthlogues of the receptor tyrosine kinase Eph and MET, namely vab-1 and RB2088 respectively, the temperature sensitive constitutively active form of KRAS, SD551 (let-60; GA89) and the inactive c-CBL equivalent mutants in sli-1 (PS2728, PS1258, and MT13032) when subjected to chronic exposure of nicotine resulted in a significant loss in egg-laying capacity and fertility. While the vab-1 mutant revealed increased circular motion in response to nicotine, the other mutant strains failed to show any effect. Overall locomotion speed increased with increasing nicotine concentration in all tested mutant strains except in the vab-1 mutants. Moreover, chronic nicotine exposure, in general, upregulated kinases and phosphatases. Taken together, these studies provide evidence in support of C. elegans as initial in vivo model to study nicotine and its effects on oncogenic mutations identified in humans.

  14. Crawler Transporter 2 Trek

    NASA Image and Video Library

    2016-03-23

    A truck sprays water in front of NASA’s upgraded crawler-transporter 2 (CT-2) to control dust as it begins the trek from the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida to Launch Pad 39B to test recently completed upgrades and modifications for NASA’s journey to Mars. The Ground Systems Development and Operations Program at Kennedy oversaw upgrades to the crawler in the VAB. The crawler will carry the mobile launcher with Orion atop the Space Launch System rocket to Pad 39B for Exploration Mission-1, scheduled for 2018.

  15. Saturn V Vehicle for the Apollo 4 Mission in the Vehicle Assembly Building

    NASA Technical Reports Server (NTRS)

    1967-01-01

    This photograph depicts the Saturn V vehicle (SA-501) for the Apollo 4 mission in the Vehicle Assembly Building (VAB) at the Kennedy Space Center (KSC). After the completion of the assembly operation, the work platform was retracted and the vehicle was readied to rollout from the VAB to the launch pad. The Apollo 4 mission was the first launch of the Saturn V launch vehicle. Objectives of the unmanned Apollo 4 test flight were to obtain flight information on launch vehicle and spacecraft structural integrity and compatibility, flight loads, stage separation, and subsystems operation including testing of restart of the S-IVB stage, and to evaluate the Apollo command module heat shield. The Apollo 4 was launched on November 9, 1967 from KSC.

  16. Factors Associated With Anthropometric Indicators of Nutritional Status in Children With Chronic Kidney Disease Undergoing Peritoneal Dialysis, Hemodialysis, and After Kidney Transplant.

    PubMed

    García De Alba Verduzco, Julieta; Hurtado López, Erika Fabiola; Pontón Vázquez, Consuelo; de la Torre Serrano, Adriana; Romero Velarde, Enrique; Vásquez Garibay, Edgar Manuel

    2018-05-11

    The objective of the study was to demonstrate that there are differences in the factors associated with anthropometric indicators of nutritional status, with particular emphasis on arm indicators, in children with end-stage kidney disease undergoing peritoneal dialysis (PD), hemodialysis (HD), and after kidney transplant (KT). An analytical cross-sectional study of consecutive cases included 130 children and adolescents with end-stage kidney disease undergoing substitutive treatment: 49 patients who underwent KT, 33 undergoing PD, and 47 undergoing HD. Socioeconomic data were obtained from all the 3 groups; anthropometric indicators of nutritional status were calculated. Student's t-test and analysis of variance were used for parametric variables. Chi-square test, Mann-Whitney U test, Kruskal-Wallis test, and odds ratio (OR) were used for nonparametric variables. The number of parents living as couples was higher for patients who underwent KT (OR = 3.5 [95% confidence interval {CI} 1.34-9.0]) and undergoing PD (OR = 3.0 [95% CI 1.06-8.8]) than those undergoing HD. The number of mothers who worked outside the home was higher for patients who underwent KT and undergoing PD than the mothers of patients undergoing HD (OR = 13.7 [95% CI: 4.56-41.05]; OR = 15.4 [CI 95% 4.8-49], respectively). Family income was higher for patients who underwent KT and undergoing PD (P = .019, P = .093, respectively). More than 40% of patients in all the 3 groups had growth impairment. Body mass index, mid-upper arm circumference, tricipital and subscapular skinfolds, total arm area, and arm fat area were affected in HD and PD groups (9 to 40%), while of the patients who underwent KT, 36.7% were overweight or obese. More than 50% of patients who underwent KT and undergoing HD and PD had involvement in the arm muscular area. Socioeconomic conditions are more influential for children in the HD program. The nutritional status of children after KT improves; however, not all

  17. Termite testing continues

    Treesearch

    Terence L. Wagner; Joe Mulrooney; Chris Petereson

    2002-01-01

    The United States Department of Agriculture Forest Service's termiticide testing program provides unbiased efficacy data for product registration using standardized tests, sites and evaluation procedures. Virtually all termiticides undergo Forest Service tests prior to registration.

  18. Randomized controlled trial of stereotactic 11-G vacuum-assisted core biopsy for the diagnosis and management of mammographic microcalcification

    PubMed Central

    Maxwell, Anthony J; Morris, Julie; Lim, Yit Y; Harake, MD Janick; Whiteside, Sigrid

    2016-01-01

    Objective: To compare the accuracy of 11-G vacuum-assisted biopsy (VAB) with 14-G core needle biopsy (CNB) to diagnose mammographic microcalcification (MM) and effect on surgical outcomes. Methods: Following ethical approval, VAB and CNB (control) were compared in a randomized prospective study for first-line diagnosis of MM and subsequent surgical outcomes in two breast-screening units. Participants gave written informed consent. Exclusions included comorbidity precluding surgery, prior ipsilateral breast cancer and lesions >40 mm requiring mastectomy as first surgical procedure. The final pathological diagnosis was compared with the initial biopsy result. Quality-of-life (QOL) questionnaires were administered at baseline, 2, 6 and 12 months. 110 participants were required to show a 25% improvement in diagnosis with VAB compared with CNB (90% power). Results: Eligibility was assessed for 787 cases; 129 females recalled from the National Health Service breast screening programme were randomized. Diagnostic accuracy of VAB was 86% and that of CNB was 84%. Using VAB, 2/14 (14.3%) cases upgraded from ductal carcinoma in situ to invasion at surgery and 3/19 (15.8%) using CNB. Following VAB 7/16 (44%) cases required repeat surgery vs 7/24 (29%) after CNB. Both groups recorded significant worsening of functional QOL measures and increased breast pain at follow-up. Conclusion: VAB and CNB were equally accurate at diagnosing MM, and no significant differences in surgical outcomes were observed. Advances in knowledge: The first randomized controlled study of VAB for diagnosis of microcalcification using digital mammography showed no difference in diagnostic accuracy of VAB and CNB, or in the proportion of participants needing repeat non-operative biopsy or second therapeutic operation to treat malignancy. PMID:26654214

  19. Postoperative hyperglycaemia of diabetic patients undergoing cardiac surgery - a clinical audit.

    PubMed

    Lehwaldt, Daniela; Kingston, Mary; O'Connor, Sheila

    2009-01-01

    Previous studies have shown that hyperglycaemia is associated with postoperative complications in cardiac surgical patients. Conversely, well-controlled glucose levels are said to reduce major infectious complications in diabetic patients. The purpose of this clinical audit was to evaluate the blood glucose levels of diabetic patients undergoing cardiac surgery and to determine the effectiveness of postoperative glycaemic control. A group of 150 patients from a large Irish cardiac surgery centre was selected by convenience sampling. An audit tool was designed to capture the patients' blood glucose levels, treatment regimes and postoperative complications. The findings showed major variations between 'high', 'good' and 'borderline' blood glucose levels in the pre- and postoperative phase. Although blood glucose testing practices seemed inconsistent, mean levels measured 'borderline'. Furthermore, the treatment regimes varied greatly and suggest a lack of consensus regarding the management of postoperative hyperglycaemia. A total of 52% (n = 78) patients developed 114 complications with a level of 21.4% (n = 32) postoperative wound infections. The findings from this audit highlight the importance of regular blood glucose testing to enable early detection of hyperglycaemia and timely initiation of appropriate treatments regimes for diabetic patients undergoing cardiac surgery. Findings also show that hyperglycaemia derangement may make a difference in the recovery phase. While patients will benefit from lesser wound infections, hospitals might save costs involved with treating postoperative complications. More consistent blood glucose testing might be achieved through the use of evidence-based protocols. However, the education of staff is as important as it develops knowledge on the complex metabolic interactions of diabetic patients undergoing cardiac surgery. While this means investing in staff education and policy development, costs for daily care and expensive

  20. Environmental Test Screening Procedure

    NASA Technical Reports Server (NTRS)

    Zeidler, Janet

    2000-01-01

    This procedure describes the methods to be used for environmental stress screening (ESS) of the Lightning Mapper Sensor (LMS) lens assembly. Unless otherwise specified, the procedures shall be completed in the order listed, prior to performance of the Acceptance Test Procedure (ATP). The first unit, S/N 001, will be subjected to the Qualification Vibration Levels, while the remainder will be tested at the Operational Level. Prior to ESS, all units will undergo Pre-ESS Functional Testing that includes measuring the on-axis and plus or minus 0.95 full field Modulation Transfer Function and Back Focal Length. Next, all units will undergo ESS testing, and then Acceptance testing per PR 460.

  1. KENNEDY SPACE CENTER, FLA. - A Kennedy Space Center technician inspects the shoes on one of eight tracks of a crawler-transporter (CT). The CT is moving Mobile Launcher Platform (MLP) number 3 with a set of twin solid rocket boosters bolted on top to the intersection in the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-21

    KENNEDY SPACE CENTER, FLA. - A Kennedy Space Center technician inspects the shoes on one of eight tracks of a crawler-transporter (CT). The CT is moving Mobile Launcher Platform (MLP) number 3 with a set of twin solid rocket boosters bolted on top to the intersection in the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  2. KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, inch along the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. The view reveals the river gravel surface that is 4 inches thick on the straightaway sections and 8 inches thick on curves. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-21

    KENNEDY SPACE CENTER, FLA. - Mobile Launcher Platform (MLP) number 3 and a set of twin solid rocket boosters, atop the crawler-transporter, inch along the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. The view reveals the river gravel surface that is 4 inches thick on the straightaway sections and 8 inches thick on curves. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  3. Orion Leaves from the VAB

    NASA Image and Video Library

    2014-11-11

    At NASA's Kennedy Space Center in Florida, the agency's Orion is transported to Launch Complex 37 at Cape Canaveral Air Force Station. After arrival at the launch pad, United Launch Alliance engineers and technicians will lift Orion and mount it atop its Delta IV Heavy rocket. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted flight test of Orion is scheduled to launch Dec. 4, 2014 atop a United Launch Alliance Delta IV Heavy rocket, and in 2018 on NASA’s Space Launch System rocket.

  4. 14 CFR 204.5 - Certificated and commuter air carriers undergoing or proposing to undergo substantial change in...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... undergoing or proposing to undergo substantial change in operations, ownership, or management. 204.5 Section... operations, ownership or management shall file the data set forth in § 204.3. These data must be submitted in... operations, management, or ownership, including changes that may affect the air carrier's citizenship, shall...

  5. Cerebroprotective effect of piracetam in patients undergoing coronary bypass burgery.

    PubMed

    Holinski, Sebastian; Claus, Benjamin; Alaaraj, Nour; Dohmen, Pascal Maria; Kirilova, Kremena; Neumann, Konrad; Uebelhack, Ralf; Konertz, Wolfgang

    2008-11-01

    Reduction of cognitive function is a possible side effect after cardiac surgery using cardiopulmonary bypass. We investigated the cerebroprotective effect of piracetam on cognitive performance in patients undergoing coronary artery bypass surgery under cardiopulmonary bypass. Patients scheduled for elective, primary and isolated coronary bypass surgery were randomised either to piracetam or placebo group. The study was performed in a double blind fashion. Patients received either 12 g piracetam or placebo at the beginning of the operation. Six neuropsychological subtests from the Syndrom Kurz Test and the Alzheimer's Disease Assessment Scale were performed preoperatively and on the third postoperative day. To assess the overall cognitive function and the degree of cognitive decline across all tests after surgery we combined the six test-scores by principal component analysis. A total number of 120 patients were enrolled into the study. Preoperative overall cognitive function were not significantly different between the groups. The postoperative combined score of the neuropsychological tests showed a deterioration of cognitive function in both groups (placebo-pre: -0.06+/-0.99 vs placebo-post: -1.38+/-1.11; p<0.0005 and piracetam-pre: 0.06+/-1.02 vs piracetam-post: -0.65+/-0.93; p<0.0005). However, the piracetam patients performed significantly better compared to the placebo patients after the operation and had a less decline of overall cognitive function (p<0.0005). Piracetam has a cerebroprotective effect in patients undergoing coronary artery bypass surgery with the use of cardiopulmonary bypass. It reduces an early postoperative substantial decline of neuropsychological abilities.

  6. Orion Leaves from the VAB

    NASA Image and Video Library

    2014-11-11

    At NASA's Kennedy Space Center in Florida, the agency's Orion spacecraft passes the spaceport's iconic Vehicle Assembly Building as it is transported to Launch Complex 37 at Cape Canaveral Air Force Station. After arrival at the launch pad, United Launch Alliance engineers and technicians will lift Orion and mount it atop its Delta IV Heavy rocket. Orion is the exploration spacecraft designed to carry astronauts to destinations not yet explored by humans, including an asteroid and Mars. It will have emergency abort capability, sustain the crew during space travel and provide safe re-entry from deep space return velocities. The first unpiloted flight test of Orion is scheduled to launch Dec. 4, 2014 atop a United Launch Alliance Delta IV Heavy rocket, and in 2018 on NASA’s Space Launch System rocket.

  7. Platform C North Arrival

    NASA Image and Video Library

    2016-08-30

    A section of the second half of the C-level platforms, C North, for NASA’s Space Launch System (SLS) rocket, arrives at the agency’s Kennedy Space Center in Florida. The platform was offloaded from a heavy lift transport truck and secured in a staging area in the west parking lot of the Vehicle Assembly Building (VAB). The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft and provide access for testing and processing.

  8. Platform C South Arrival

    NASA Image and Video Library

    2016-08-05

    The second section of the first half of the C-level work platforms, C South, for NASA’s Space Launch System (SLS) rocket was offloaded from a heavy transport truck in a staging area on the west side of the Vehicle Assembly Building (VAB) at the agency’s Kennedy Space Center in Florida. The Ground Systems Development and Operations Program is overseeing upgrades and modifications to VAB High Bay 3 to support processing of the SLS and Orion spacecraft. A total of 10 levels of new platforms, 20 platform halves altogether, will surround the SLS rocket and Orion spacecraft and provide access for testing and processing.

  9. Antares alignment gimbal positioner linear bearing tests

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Day, R.D.; McKay, M.D.; Pierce, D.D.

    1981-01-01

    The data indicate that of the six configurations tested, the solid circular rails with either the wet or dry lubricant are superior to the other configurations. Therefore, these two will undergo additional tests. These tests will consist of (1) modifying the testing procedure to obtain a better estimation of the limits of precision; and (2) subjecting the bearings to moments more closely approximating the actual conditions they will undergo on the AGP.

  10. Getting Closer to Countdown: Spacecraft Undergoes Readiness Tests

    NASA Image and Video Library

    2005-07-19

    It no easy task getting NASA Mars Reconnaissance Orbiter ready for launch. Workers stabilize the crane holding one of the enormous billboard-sized solar panels temporarily removed from the spacecraft prior to rigorous testing.

  11. Free-Flight Test Results of Scale Models Simulating Viking Parachute/Lander Staging

    NASA Technical Reports Server (NTRS)

    Polutchko, Robert J.

    1973-01-01

    This report presents the results of Viking Aerothermodynamics Test D4-34.0. Motion picture coverage of a number of Scale model drop tests provides the data from which time-position characteristics as well as canopy shape and model system attitudes are measured. These data are processed to obtain the instantaneous drag during staging of a model simulating the Viking decelerator system during parachute staging at Mars. Through scaling laws derived prior to test (Appendix A and B) these results are used to predict such performance of the Viking decelerator parachute during staging at Mars. The tests were performed at the NASA/Kennedy Space Center (KSC) Vertical Assembly Building (VAB). Model assemblies were dropped 300 feet to a platform in High Bay No. 3. The data consist of an edited master film (negative) which is on permanent file in the NASA/LRC Library. Principal results of this investigation indicate that for Viking parachute staging at Mars: 1. Parachute staging separation distance is always positive and continuously increasing generally along the descent path. 2. At staging, the parachute drag coefficient is at least 55% of its prestage equilibrium value. One quarter minute later, it has recovered to its pre-stage value.

  12. KSC-98pc1238

    NASA Image and Video Library

    1998-09-21

    KENNEDY SPACE CENTER, FLA. -- Looking eastward, the Vehicle Assembly Building (VAB) in the Launch Complex 39 area can be seen with its new coat of paint, along with newly painted American flag and NASA logo. The improved look was finished in time to honor NASA's 40th anniversary on Oct. 1. In order to do the job, workers were suspended on platforms from the top of the 525-foot-high VAB. One of the world's largest buildings by volume, the VAB is the last stop for the Shuttle before rollout to the launch pad. Integration and stacking of the complete Space Shuttle vehicle (orbiter, two solid rocket boosters and the external tank) takes place in High Bays 1 or 3. Stretching from the side of the VAB, on the right, is the crawlerway, used to transport the Space Shuttle to the launch pad. Beyond the VAB is Banana Creek

  13. Children with chronic renal disease undergoing dialysis or conservative treatment--differences in structural and functional echocardiographic parameters.

    PubMed

    Scavarda, Valeska Tavares; Pinheiro, Aurelio Carvalho; Costa, Symône Damasceno; de Andrade, Zélia Maria; Carvalhaes, João Tomás de Abreu; Campos, Orlando; Carvalho, Antonio Carlos; Moises, Valdir Ambrosio

    2014-10-01

    Cardiac disease frequently occurs in children with chronic kidney disease (CKD) undergoing dialysis (DI), but it is not well studied in patients undergoing conservative treatment (CT). The aim of our study was to use echocardiography to analyze and compare the cardiac involvement of children with CKD undergoing DI or CT. Seventy-one children with CKD were included; 41 undergoing DI and 30 undergoing CT. There were 33 controls. Measurements of arterial pressure and structural and functional echocardiographic variables were obtained; the children were followed up for 18 months. Tests of comparison and multiple regression were used; significant if P < 0.05. Arterial hypertension (AH) was present in 37 of 71 (52%) children with CKD: 27 (65.8%) in DI and 10 (33.3%) in CT (X2 = 8.7; P = 0.003). An abnormal left ventricular geometric pattern was present in 37/41 (90.3%) undergoing DI, 33 had left ventricular hypertrophy (LVH), and in 14/30 (46.7%) undergoing CT, 5 had LVH. Ejection fraction was normal in all groups; diastolic function alteration (DFA) occurred in 28/41 (68.3%) children on DI and in 10/30 (33.3%) on CT (X2 = 9.2; P = 0.002). For children with CKD, DI (P = 0.002) and hypertension (P = 0.04) were associated with LVH; among those on DI, only AH was associated with LVH (P = 0.02). During the follow-up, 18 (43.9%) children undergoing DI had at least one cardiovascular event. Children with CKD undergoing CT had less cardiac involvement than those undergoing DI. LVH was associated with DI and AH in all children with CKD and with AH in those on DI.

  14. Total cost comparison of 2 biopsy methods for nonpalpable breast lesions.

    PubMed

    Bodai, B I; Boyd, B; Brown, L; Wadley, H; Zannis, V J; Holzman, M

    2001-05-01

    To identify, quantify, and compare total facility costs for 2 breast biopsy methods: vacuum-assisted biopsy (VAB) and needle-wire-localized open surgical biopsy (OSB). A time-and-motion study was done to identify unit resources used in both procedures. Costs were imputed from published literature to value resources. A comparison of the total (fixed and variable) costs of the 2 procedures was done. A convenience sample of 2 high-volume breast biopsy (both VAB and OSB) facilities was identified. A third facility (OSB only) and 8 other sites (VAB only) were used to capture variation. Staff interviews, patient medical records, and billing data were used to check observed data. One hundred and sixty-seven uncomplicated procedures (71 OSBs, 96 VABs) were observed. Available demographic and clinical data were analyzed to assess selection bias, and sensitivity analyses were done on the main assumptions. The total facility costs of the VAB procedure were lower than the costs of the OSB procedure. The overall cost advantage for using VAB ranges from $314 to $843 per procedure depending on the facility type. Variable cost comparison indicated little difference between the 2 procedures. The largest fixed cost difference was $763. Facilities must consider the cost of new technology, especially when the new technology is as effective as the present technology. The seemingly high cost of equipment might negatively influence a decision to adopt VAB, but when total facility costs were analyzed, the new technology was less costly.

  15. [The health of adults undergoing an eviction process].

    PubMed

    Bolívar Muñoz, Julia; Bernal Solano, Mariola; Mateo Rodríguez, Inmaculada; Daponte Codina, Antonio; Escudero Espinosa, Cecilia; Sánchez Cantalejo, Carmen; González Usera, Isis; Robles Ortega, Humbelina; Mata Martín, José Luis; Fernández Santaella, M Carmen; Vila Castellar, Jaime

    2016-01-01

    To analyze perceived health status and other health-related indicators in the adult population in Granada (Spain) undergoing an eviction process from their homes, whether rented or owned, in comparison with health indicators in the general adult population in Andalusia. A cross-sectional survey was administered by trained staff. The survey included instruments from the Andalusian Health Survey 2011 for measuring variables related to physical and mental health, as well as health-related habits. We compared the results with those obtained from the Andalusian general population through the Andalusian Health Survey. A bivariate analysis using the χ2 test and a multivariate logistic regression analysis were conducted. We obtained a total sample of 205 people in the process of eviction. A total of 59.5% (n=122) were women, and 40.5% (n=83) were men. Participants were more likely to have poor health (odds ratio [OR]: 12.63, 95% confidence interval [95%CI]: 8.74-18.27), have cardiovascular diseases (OR: 3.08; 95%CI: 1.54- 6.16), or to smoke (OR: 1.68; 95% CI: 1.21-2.33) compared with the Andalusian general population. Most of the health indicators analyzed showed a worse outcome for women undergoing an eviction process. Our results suggest that, in the current context of economic crisis, people undergoing a process of eviction in Granada and its metropolitan area show poorer health than the Andalusian general population. Further research is needed on health and evictions from different methodological approaches, for a better understanding of the topic. Copyright © 2015 SESPAS. Published by Elsevier Espana. All rights reserved.

  16. STS-71 hardware assembly view

    NASA Technical Reports Server (NTRS)

    1994-01-01

    Lockheed Space Operations Company workers in the Extended Duration Orbiter (EDO) Facility, located inside the Vehicle Assembly Building (VAB), carefully hoist the Orbiter Docking System (ODS) from its shipping container into a test stand. The ODS was ship

  17. KSC-03PD-3120

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. The crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, away from the Vehicle Assembly Building (VAB) in support of engineering analysis vibration tests on the crawler and MLP. In the distance, at left, is Launch Pad 39A. The water on the right of the crawlerway is the Banana River. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  18. Wake Shield Facility Modal Survey Test in Vibration Acoustic Test Facility

    NASA Image and Video Library

    1991-10-09

    Astronaut Ronald M. Sega stands beside the University of Houston's Wake Shield Facility before it undergoes a Modal Survey Test in the Vibration and Acoustic Test Facility Building 49, prior to being flown on space shuttle mission STS-60.

  19. [The importance of using a test to detect Chlamydia trachomatis infection in patients undergoing counseling and testing for sexually transmitted diseases at a public health center].

    PubMed

    Hatori, Toru; Nakamura, Tamiko; Tsukui, Satoshi

    2013-01-01

    Serum levels of antibody against Chlamydia trachomatis are used routinely to diagnose chlamydial infection among patients undergoing counseling and testing for sexually transmitted disease at public health centers in Japan, whereas tests for pathogen detection are conducted at most clinics. The objective of the present study was to evaluate the usefulness of a test for detecting C. trachomatis and to compare it with that of screening for serum chlamydia antibodies at a public health center. Serum chlamydia antibody titers were estimated using an ELISA, while C. trachomatis was detected in the urine using the nucleic acid amplification assay that included strand displacement amplification (SDA). We compared the results of 120 patients (64 men and 56 women), because the sensitivity of the method using urine samples from women has been reported to be as high as that using cervical samples. The serum antibody test results were considered to be positive when either one or both of the IgA and IgG antibodies were positive. The overall prevalence of positive results for the antibody test was 24.2% (14.1% for men and 35.7% for women), and that for the SDA method was 7.5% (3.1% for men and 12.5% for women). The concordance rate of the 2 tests was 81.7%, with a kappa statistic of 0.35 (95% CI, 0.10-0.59). Of the 9 subjects who were positive for C. trachomatis using the SDA assay, 1 had serum chlamydia IgA antibodies, 6 had IgG antibodies, 1 had both the antibodies, and 1 had no antibodies. On the other hand, of the 111 subjects who were negative for C. trachomatis, only 8 had chlamydia IgA antibodies, 5 had IgG antibodies, and 8 had both the antibodies. These results indicated there was no association between serum IgA antibodies and the presence of C. trachomatis. The presence of serum chlamydia antibodies was significantly higher in subjects with a past history of genital chlamydial infection than in those without a past history of infection (P<0.01). However, there was no

  20. A comparison of diagnostic performance of vacuum-assisted biopsy and core needle biopsy for breast microcalcification: a systematic review and meta-analysis.

    PubMed

    Huang, Xu Chen; Hu, Xu Hua; Wang, Xiao Ran; Zhou, Chao Xi; Wang, Fei Fei; Yang, Shan; Wang, Gui Ying

    2018-03-16

    Core needle biopsy (CNB) and vacuum-assisted biopsy (VAB) are both popularly used breast percutaneous biopsies. Both of them have become reliable alternatives to open surgical biopsy (OSB) for breast microcalcification (BM). It is controversial that which biopsy method is more accurate and safer for BM. Hence, we conducted this meta-analysis to compare the diagnostic performance between CNB and VAB for BM, aiming to find out the better method. Articles according with including and excluding criteria were collected from the databases, PubMed, Embase, and the Cochrane Library. Preset outcomes were abstracted and pooled to find out the potential advantages in CNB or VAB. Seven studies were identified and entered final meta-analysis from initially found 138 studies. The rate of ductal carcinoma in situ (DCIS) underestimation was significantly lower in VAB than CNB group [risk ratio (RR) = 1.83, 95% confidence interval (CI) 1.40 to 2.40, p < 0.001]. The microcalcification retrieval rate was significantly higher in VAB than CNB group (RR = 0.89, 95% CI 0.81 to 0.98, p = 0.02), while CNB owned a significantly lower complication rate than VAB (RR = 0.18, 95% CI 0.03 to 0.93, p = 0.04). The atypical ductal hyperplasia (ADH) underestimation rates were not compared for the limited number of studies reporting this outcome. Compared with CNB, VAB shows better diagnostic performance in DCIS underestimation rate and microcalcification retrieval rate. However, CNB shows a significantly lower complication rate. More studies are needed to verify these findings.

  1. Ultrasound-guided cable-free 13-gauge vacuum-assisted biopsy of non-mass breast lesions

    PubMed Central

    Seo, Jiwoon; Jang, Mijung; Yun, Bo La; Lee, Soo Hyun; Kim, Eun-Kyu; Kang, Eunyoung; Park, So Yeon; Moon, Woo Kyung; Choi, Hye Young; Kim, Bohyoung

    2017-01-01

    Purpose To compare the outcomes of ultrasound-guided core biopsy for non-mass breast lesions by the novel 13-gauge cable-free vacuum-assisted biopsy (VAB) and by the conventional 14-gauge semi-automated core needle biopsy (CCNB). Materials and methods Our institutional review board approved this prospective study, and all patients provided written informed consent. Among 1840 ultrasound-guided percutaneous biopsies performed from August 2013 to December 2014, 145 non-mass breast lesions with suspicious microcalcifications on mammography or corresponding magnetic resonance imaging finding were subjected to 13-gauge VAB or 14-gauge CCNB. We evaluated the technical success rates, average specimen numbers, and tissue sampling time. We also compared the results of percutaneous biopsy and final surgical pathologic diagnosis to analyze the rates of diagnostic upgrade or downgrade. Results Ultrasound-guided VAB successfully targeted and sampled all lesions, whereas CCNB failed to demonstrate calcification in four (10.3%) breast lesions with microcalcification on specimen mammography. The mean sampling time were 238.6 and 170.6 seconds for VAB and CCNB, respectively. No major complications were observed with either method. Ductal carcinoma in situ (DCIS) and atypical ductal hyperplasia (ADH) lesions were more frequently upgraded after CCNB (8/23 and 3/5, respectively) than after VAB (2/26 and 0/4, respectively P = 0.028). Conclusion Non-mass breast lesions were successfully and accurately biopsied using cable-free VAB. The underestimation rate of ultrasound-detected non-mass lesion was significantly lower with VAB than with CCNB. Trial registration CRiS KCT0002267. PMID:28628656

  2. Chest wall mechanics in sustained microgravity

    NASA Technical Reports Server (NTRS)

    Wantier, M.; Estenne, M.; Verbanck, S.; Prisk, G. K.; Paiva, M.; West, J. B. (Principal Investigator)

    1998-01-01

    We assessed the effects of sustained weightlessness on chest wall mechanics in five astronauts who were studied before, during, and after the 10-day Spacelab D-2 mission (n = 3) and the 180-day Euromir-95 mission (n = 2). We measured flow and pressure at the mouth and rib cage and abdominal volumes during resting breathing and during a relaxation maneuver from midinspiratory capacity to functional residual capacity. Microgravity produced marked and consistent changes (Delta) in the contribution of the abdomen to tidal volume [DeltaVab/(DeltaVab + DeltaVrc), where Vab is abdominal volume and Vrc is rib cage volume], which increased from 30.7 +/- 3. 5 (SE)% at 1 G head-to-foot acceleration to 58.3 +/- 5.7% at 0 G head-to-foot acceleration (P < 0.005). Values of DeltaVab/(DeltaVab + DeltaVrc) did not change significantly during the 180 days of the Euromir mission, but in the two subjects DeltaVab/(DeltaVab + DeltaVrc) was greater on postflight day 1 than on subsequent postflight days or preflight. In the two subjects who produced satisfactory relaxation maneuvers, the slope of the Konno-Mead plot decreased in microgravity; this decrease was entirely accounted for by an increase in abdominal compliance because rib cage compliance did not change. These alterations are similar to those previously reported during short periods of weightlessness inside aircrafts flying parabolic trajectories. They are also qualitatively similar to those observed on going from upright to supine posture; however, in contrast to microgravity, such postural change reduces rib cage compliance.

  3. The Mars Polar Lander undergoes spin test

    NASA Technical Reports Server (NTRS)

    1998-01-01

    In the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2), workers maneuver the Mars Polar Lander onto a spin table for testing. The lander, which will be launched on Jan. 3, 1999, is a solar-powered spacecraft designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere. It is the second spacecraft to be launched in a pair of Mars '98 missions. The first is the Mars Climate Orbiter, which is due to be launched aboard a Delta II rocket from Launch Complex 17A on Dec. 11, 1998.

  4. The Mars Polar Lander undergoes spin test

    NASA Technical Reports Server (NTRS)

    1998-01-01

    In the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2), the Mars Polar Lander is lowered toward a spin table for testing. The lander, which will be launched on Jan. 3, 1999, is a solar- powered spacecraft designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere. It is the second spacecraft to be launched in a pair of Mars '98 missions. The first is the Mars Climate Orbiter, which is due to be launched aboard a Delta II rocket from Launch Complex 17A on Dec. 11, 1998.

  5. [Eradication of Staphylococcus aureus in carrier patients undergoing joint arthroplasty].

    PubMed

    Barbero Allende, José M; Romanyk Cabrera, Juan; Montero Ruiz, Eduardo; Vallés Purroy, Alfonso; Melgar Molero, Virginia; Agudo López, Rosa; Gete García, Luis; López Álvarez, Joaquín

    2015-02-01

    Prosthetic joint infection (PJI) is a complication with serious repercussions and its main cause is Staphylococcus aureus. The purpose of this study is to determine whether decolonization of S.aureus carriers helps to reduce the incidence of PJI by S.aureus. An S.aureus screening test was performed on nasal carriers in patients undergoing knee or hip arthroplasty between January and December 2011. Patients with a positive test were treated with intranasal mupirocin and chlorhexidine soap 5 days. The incidence of PJI was compared with patients undergoing the same surgery between January and December 2010. A total of 393 joint replacements were performed in 391 patients from the control group, with 416 joint replacements being performed in the intervention group. Colonization study was performed in 382 patients (91.8%), of which 102 were positive (26.7%) and treated. There was 2 PJI due S.aureus compared with 9 in the control group (0.5% vs 2.3%, odds ratio [OR]: 0.2, 95% confidence interval [CI]: 0.4 to 2.3, P=.04). In our study, the detection of colonization and eradication of S.aureus carriers achieved a significant decrease in PJI due to S.aureus compared to a historical group. Copyright © 2013 Elsevier España, S.L.U. y Sociedad Española de Enfermedades Infecciosas y Microbiología Clínica. All rights reserved.

  6. Risk factors for psychiatric disorders in infertile women and men undergoing in vitro fertilization treatment.

    PubMed

    Volgsten, Helena; Skoog Svanberg, Agneta; Ekselius, Lisa; Lundkvist, Orjan; Sundström Poromaa, Inger

    2010-03-01

    To identify risk factors associated with depression and anxiety in infertile women and men undergoing in vitro fertilization (IVF). Prospective study. A university hospital in Sweden during a 2-year period. 825 participants (413 women and 412 men). Primary Care Evaluation of Mental Disorders (PRIME-MD), based on the Diagnostic and Statistical Manual of Mental Disorders, 4th edition (DSM-IV), as the diagnostic tool for evaluating mood and anxiety disorders, and fertility history and outcome of IVF treatment collected from the patients' medical records. Risk factors associated with depression and anxiety disorders. A negative pregnancy test and obesity were the independent risk factors for any mood disorders in women. Among men, the only independent risk factor for depression was unexplained infertility. No IVF-related risk factors could be identified for any anxiety disorder. A negative pregnancy test is associated with an increased risk for depression in women undergoing IVF, but no risk of developing anxiety disorders is associated with the pregnancy test result after IVF. Pregnancy test results were not a risk factor for depression or anxiety among men. Copyright 2010 American Society for Reproductive Medicine. Published by Elsevier Inc. All rights reserved.

  7. KENNEDY SPACE CENTER, FLA. - The crawler-transporter carrying Mobile Launcher Platform (MLP) number 3, with a set of twin solid rocket boosters bolted atop, crawls to the intersection in the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. From this perspective, the Launch Control Center (left) and the 525-foot-tall Vehicle Assembly Building (right) in the background appear dwarfed by the 184-foot-tall boosters. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-21

    KENNEDY SPACE CENTER, FLA. - The crawler-transporter carrying Mobile Launcher Platform (MLP) number 3, with a set of twin solid rocket boosters bolted atop, crawls to the intersection in the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. From this perspective, the Launch Control Center (left) and the 525-foot-tall Vehicle Assembly Building (right) in the background appear dwarfed by the 184-foot-tall boosters. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  8. KENNEDY SPACE CENTER, FLA. - A crawler-transporter carrying Mobile Launcher Platform (MLP) number 3, with a set of twin solid rocket boosters bolted atop, crawls to the intersection in the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. From this perspective, the Launch Control Center (left) and the 525-foot-tall Vehicle Assembly Building (right) in the background appear dwarfed by the 184-foot-tall boosters. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

    NASA Image and Video Library

    2003-11-21

    KENNEDY SPACE CENTER, FLA. - A crawler-transporter carrying Mobile Launcher Platform (MLP) number 3, with a set of twin solid rocket boosters bolted atop, crawls to the intersection in the crawlerway in support of the second engineering analysis vibration test on the crawler and MLP. From this perspective, the Launch Control Center (left) and the 525-foot-tall Vehicle Assembly Building (right) in the background appear dwarfed by the 184-foot-tall boosters. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB, travels toward Launch Pad 39A and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  9. The Mars Polar Lander undergoes spin test

    NASA Technical Reports Server (NTRS)

    1998-01-01

    Workers in the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2) lift the Mars Polar Lander to move it to a spin table for testing. The lander, which will be launched on Jan. 3, 1999, is a solar-powered spacecraft designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere. It is the second spacecraft to be launched in a pair of Mars '98 missions. The first is the Mars Climate Orbiter, which is due to be launched aboard a Delta II rocket from Launch Complex 17A on Dec. 11, 1998.

  10. KENNEDY SPACE CENTER, FLA. - A flatbed truck carrying pieces of Columbia debris arrives in the transfer aisle of the Vehicle Assembly Building. The debris is being transferred to the VAB for permanent storage. More than 83,000 pieces of debris were shipped to KSC during search and recovery efforts in East Texas. That represents about 38 percent of the dry weight of Columbia, equaling almost 85,000 pounds.

    NASA Image and Video Library

    2003-09-15

    KENNEDY SPACE CENTER, FLA. - A flatbed truck carrying pieces of Columbia debris arrives in the transfer aisle of the Vehicle Assembly Building. The debris is being transferred to the VAB for permanent storage. More than 83,000 pieces of debris were shipped to KSC during search and recovery efforts in East Texas. That represents about 38 percent of the dry weight of Columbia, equaling almost 85,000 pounds.

  11. F-1 Engine for Saturn V Undergoing a Static Test

    NASA Technical Reports Server (NTRS)

    1964-01-01

    The flame and exhaust from the test firing of an F-1 engine blast out from the Saturn S-IB Static Test Stand in the east test area of the Marshall Space Flight Center. A Cluster of five F-1 engines, located in the S-IC (first) stage of the Saturn V vehicle, provided over 7,500,000 pounds of thrust to launch the giant rocket. The towering 363-foot Saturn V was a multistage, multiengine launch vehicle standing taller than the Statue of Liberty. Altogether, the Saturn V engines produced as much power as 85 Hoover Dams.

  12. Cognitive assessment instruments in Parkinson's disease patients undergoing deep brain stimulation

    PubMed Central

    Romann, Aline Juliane; Dornelles, Silvia; Maineri, Nicole de Liz; Rieder, Carlos Roberto de Mello; Olchik, Maira Rozenfeld

    2012-01-01

    Deep Brain Stimulation (DBS) is a widely used surgical technique in individuals with Parkinson's disease (PD) that can lead to significant reductions in motor symptoms. Objectives To determine, from publications, the most commonly used instruments for cognitive evaluation of individuals with PD undergoing DBS. Methods A systematic review of the databases: PubMed, Medline, EBECS, Scielo and LILACS was conducted, using the descriptors "Deep Brain Stimulation", "Verbal Fluency", "Parkinson Disease", "Executive Function", "Cognition" and "Cognitive Assessment" in combination. Results The Verbal Fluency test was found to be the most used instrument for this investigation in the studies, followed by the Boston Naming Test. References to the Stroop Test, Trail Making Test, and Rey's Auditory Verbal Learning Test were also found. Conclusions The validation of instruments for this population is needed as is the use of batteries offering greater specificity and sensitivity for the detection of cognitive impairment. PMID:29213766

  13. Evolution of a behavioral shift mediated by superficial neuromasts helps cavefish find food in darkness

    PubMed Central

    Yoshizawa, Masato; Gorčiki, Špela; Soares, Daphne; Jeffery, William R.

    2010-01-01

    Summary How cave animals adapt to life in darkness is a poorly understood aspect of evolutionary biology [1]. Here we identify a behavioral shift and its morphological basis in Astyanax mexicanus, a teleost with a sighted surface dwelling form (surface fish) and various blind cave dwelling forms (cavefish) [2–4]. Vibration attraction behavior (VAB) is the ability of fish to swim toward the source of a water disturbance in darkness. VAB was typically seen in cavefish, rarely in surface fish, and advantageous for feeding success in the dark. The potential for showing VAB has a genetic component and is linked to the mechanosensory function of the lateral line. VAB was evoked by vibration stimuli peaking at 35 Hz, blocked by lateral line inhibitors, appeared after developmental increases in superficial neuromast (SN) number and size [5–7], and was significantly reduced by bilateral ablation of SN. We conclude that VAB and SN enhancement co-evolved to compensate for loss of vision and help blind cavefish find food in darkness. PMID:20705469

  14. Experiences of Spanish women undergoing hysterosalpingography as part of the infertility process: a phenomenological study.

    PubMed

    Fernández-Sola, Cayetano; Martínez-Caba, María Isabel; Hernández-Padilla, José Manuel; Carmona-Samper, Esther; Granero-Molina, José

    2016-02-01

    To describe and understand the experiences and perceptions of women who undergo hysterosalpingography as part of the infertility process. Nurses and midwives should conduct research into the emotional aspects of caring for patients undergoing infertility treatment. The hysterosalpingography is considered to be the most feared test in the infertility process and the one about which very little is known. A phenomenological qualitative study. Ten Spanish women who had undergone hysterosalpingography participated in this study. In-depth interviews were carried out between October 2012-May 2013. Data analysis was performed with the help of atlas.ti software to identify emerging themes. The experience of the participants who underwent hysterosalpingography during the infertility process is represented by the following three themes: (1) becoming a mother to feel complete as a person and as a woman, with the subthemes 'maternity as a life objective' and 'maternity in terms of gender identity'; (2) infertility--an intimate experience which provokes negative feelings, with the subthemes 'negative feelings regarding own infertility' and 'infertility as an experience that is little shared with others'; (3) Undergoing hysterosalpingography, with the subthemes 'feelings regarding hysterosalpingography', 'treatment by medical providers' and 'areas for improvement regarding the service given by the providers'. For women who undergo hysterosalpingography, maternity may be seen as a life objective that could identify them as women. Results suggest that although infertility is experienced with negative feelings such as anxiety, frustration and sadness, hysterosalpingography seems to be related with both hope and fear when facing the test. Knowing the experiences of these women could help nurses, midwives and physicians to provide better patient-centred care. © 2016 John Wiley & Sons Ltd.

  15. KSC-03PD-3128

    NASA Technical Reports Server (NTRS)

    2003-01-01

    KENNEDY SPACE CENTER, FLA. Viewed across the turn basin in the Launch Complex 39 Area, the crawler transporter slowly moves the Mobile Launcher Platform (MLP), carrying a set of twin solid rocket boosters, away from the Vehicle Assembly Building (VAB). The journey is in support of engineering analysis vibration tests on the crawler and MLP. The water on the right of the crawlerway is the Banana River. The crawler is moving at various speeds up to 1 mph in an effort to achieve vibration data gathering goals as it leaves the VAB and then returns. The boosters are braced at the top for stability. The primary purpose of these rollout tests is to gather data to develop future maintenance requirements on the transport equipment and the flight hardware. Various parts of the MLP and crawler transporter have been instrumented with vibration data collection equipment.

  16. Honey prevents oral mocositis in children undergoing chemotherapy: A quasi-experimental study with a control group.

    PubMed

    Kobya Bulut, Hacer; Güdücü Tüfekci, Fatma

    2016-12-01

    There are numerous pharmacological and non-pharmacological treatment options available in the treatment of oral mucositis. However, in spite of so many methods and products, medical professionals have not come to a consensus as to which of these offer the best results. This study was conducted to assess the effect of oral care with honey on children undergoing chemotherapy for the prevention and healing of oral mucositis. This quasi-experimental study was conducted on children undergoing chemotherapy. The study group consisted of 83 children who attended clinics and polyclinics for chemotherapy. All the children were included in the study period. The study was completed with a total of 76 children except for seven patients who were excluded from the study. The data were collected using a form and the World Health Organization Mucositis Assessment Index. The data were analyzed using percentage distributions, means, a chi-square test, a t-test, a variance analysis, and a Friedman test. Ethics approval of the study was obtained from the Institution Ethics Committee. It was found that the severity of oral mucositis in the children in the experimental group was significantly less than the control group. The mucositis recovery period in the experimental group was significantly shorter than the control group. Regular oral care with honey for children undergoing chemotherapy for hematological cancers prevents mucositis and also accelerates recovery of it when started after mucositis onset. Copyright © 2016. Published by Elsevier Ltd.

  17. Students' Initial Knowledge State and Test Design: Towards a Valid and Reliable Test Instrument

    ERIC Educational Resources Information Center

    CoPo, Antonio Roland I.

    2015-01-01

    Designing a good test instrument involves specifications, test construction, validation, try-out, analysis and revision. The initial knowledge state of forty (40) tertiary students enrolled in Business Statistics course was determined and the same test instrument undergoes validation. The designed test instrument did not only reveal the baseline…

  18. Oral Triiodothyronine for Infants and Children Undergoing Cardiopulmonary Bypass.

    PubMed

    Marwali, Eva M; Boom, Cindy E; Budiwardhana, Novik; Fakhri, Dicky; Roebiono, Poppy S; Santoso, Anwar; Sastroasmoro, Sudigdo; Slee, April; Portman, Michael A

    2017-08-01

    This study evaluated the efficacy and safety of oral triiodothyronine (T3; Tetronine, Dalim BioTech, Korea) for infants and children undergoing cardiopulmonary bypass in an Indonesian population. We performed a single-center, randomized, double-blind, and placebo-controlled trial in children aged 3 years and younger undergoing congenital heart disease operations with cardiopulmonary bypass. We administered oral T3 (1 μg/kg per body weight/dose) or placebo (saccharum lactis) by nasogastric tube every 6 hours for 60 hours after induction of anesthesia. The primary end point, time to extubation, was compared with Cox regression. The modified intention-to-treat group included 101 placebo and 104 treated patients. The stratified log-rank test did not show a significant treatment difference (p = 0.061) for time to extubation, but after adjustment for age, the nutritional Z score, and Aristotle surgical complexity, the hazard ratio was 1.33 (95% confidence interval, 1.00 to 1.76; p = 0.049). The effect of T3 was stronger in the strata aged 5 months and younger (hazard ratio, 1.86; 95% confidence interval 1.02 to 3.39; p = 0.043). Median intubation time was 47.3 hours for the placebo and 32.1 hours for the T3 group in aged 5 months and younger. Adverse events rates, including arrhythmia, were similar between groups, although sepsis was more frequent with placebo. Oral T3 supplementation may shorten time to extubation in children undergoing congenital heart disease operations, particularly infants aged 5 months or younger. Administration is relatively safe, simple and inexpensive. Copyright © 2017 The Society of Thoracic Surgeons. Published by Elsevier Inc. All rights reserved.

  19. Race, Gender, and Teacher Testing: How Informative a Tool Is Teacher Licensure Testing?

    ERIC Educational Resources Information Center

    Goldhaber, Dan; Hansen, Michael

    2010-01-01

    Virtually all states require teachers to undergo licensure testing before participation in the public school labor market. This article analyzes the information these tests provide about teacher effectiveness. The authors find that licensure tests have different predicative validity for student achievement by teacher race. They also find that…

  20. Caring for women undergoing cardiac ablation.

    PubMed

    Keegan, Beryl

    2008-09-01

    Radiofrequency cardiac ablation (RFCA) has become the treatment of choice for many cardiac arrhythmias that have not responded to medication. Complications of cardiac ablation include bleeding, thrombosis, pericardial tamponade, and stroke. Many complications are procedure specific, and several complications can be avoided with appropriate nursing care. Quality patient outcomes begin with competent nursing care. Therefore it is vital for a patient undergoing a percutaneous cardiac ablation procedure to receive supportive care and pre- and post-interventional patient education. This article discusses the nursing care of women undergoing RFCA.

  1. American-built hardware for ASPT undergoes pre-delivery preparations

    NASA Image and Video Library

    1974-09-11

    S74-28295 (September 1974) --- American-built hardware for the joint U.S.-USSR Apollo-Soyuz Test Project mission undergoes pre-delivery preparations in the giant clean room at Rockwell International Corporation?s Space Division at Downey, California. The U.S. portion of the ASTP docking system is in the right foreground. In the right background is the cylindrical-shaped docking module, which is designed to link the Apollo and Soyuz spacecraft when they dock in Earth orbit next summer. In the left background is the Apollo Command Module which they will carry the three American astronauts into Earth orbit. Photo credit: NASA

  2. Pre-operative endoscopic ultrasonography can optimise the management of patients undergoing laparoscopic cholecystectomy with abnormal liver function tests as the sole risk factor for choledocholithiasis: a prospective study.

    PubMed

    Meroni, E; Bisagni, P; Bona, S; Fumagalli, U; Zago, M; Rosati, R; Malesci, A

    2004-01-01

    Pre-operative endosonography has been proposed as a cost-effective procedure in the management of patients who undergo laparoscopic cholecystectomy having an intermediate risk of common bile duct stones. We prospectively evaluated the impact of pre-operative endosonography on the management of patients facing laparoscopic cholecystectomy with abnormal liver function tests as the sole risk factor for choledocolithiasis. Among 587 consecutive patients scheduled for laparoscopic cholecystectomy, 47 (8%) patients having one or more abnormal liver function tests but a normal appearance of common bile duct at abdominal ultrasound, underwent pre-operative endosonography. In patients with endosonography-detected common bile duct stones, a pre-operative endoscopic retrograde cholangiography was performed, or an intra-operative endoscopic retrograde cholangiography was scheduled. In all endosonography-negative patients, an intra-operative trans-cystic cholangiography was performed. Endosonography detected common bile duct stones in nine patients (19%) but only in five of them stones were radiologically confirmed (PPV 0.55). Endosonography-detected stones were confirmed in four of four (100%) patients in whom cholangiography was performed within 1 week, but only in one of five (20%) patients in whom radiology was further delayed (P < 0.05). In three of four cases (75%), stones detected at endosonography but not confirmed at X-rays, were smaller than 2.0 mm. Among 38 patients with negative endosonography, common bile duct stones were found in two patients (NPV 0.95), whereas unplanned endoscopic stone extraction was needed only in one patient (NPV 0.97). Pre-operative endosonography can spare unnecessary pre-operative endoscopic retrograde cholangiography as well as inappropriate scheduling of intra-operative endoscopic retrograde cholangiography in patients undergoing laparoscopic cholecystectomy with abnormal liver function tests. To maximise the impact of endosonography on

  3. Clinical feasibility of pre-operative neurodevelopmental assessment of infants undergoing open heart surgery.

    PubMed

    Campbell, Miranda; Rabbidge, Bridgette; Ziviani, Jenny; Sakzewski, Leanne

    2017-08-01

    Assessing the neurodevelopmental status of infants with congenital heart disease before surgery provides a means of identifying those at heightened risk of developmental delay. This study aimed to investigate factors impacting clinical feasibility of pre-operative neurodevelopmental assessment of infants undergoing early open heart surgery. Infants who underwent open heart surgery prior to 4 months of age participated in this cross-sectional study. The Test of Infant Motor Performance and Prechtl's Assessment of General Movements were undertaken on infants pre-operatively. When assessments could not be undertaken, reasons were ascribed to either infant or environmental circumstances. Demographic data and Aristotle scores were compared between groups of infants who did or did not undergo assessment. Binary logistic regression was used to explore associations. A total of 60 infants participated in the study. Median gestational age was 38.78 weeks (interquartile range: 36.93-39.72). Of these infants, 37 (62%) were unable to undergo pre-operative assessment. Twenty-four (40%) could not complete assessment due to infant-related factors and 13 (22%) due to environmental-related factors. For every point increase in the Aristotle Patient-Adjusted Complexity score, the infants likelihood of being unable to undergo assessment increased by 35% (odds ratio: 0.35; 95% confidence interval: 1.03-1.77, P = 0.03). Over half of the infants undergoing open heart surgery were unable to complete pre-operative neurodevelopmental assessment. The primary reason for this was infant-related medical instability. Findings suggest further research is warranted to investigate whether the Aristotle Patient-Adjusted Complexity score might serve as an indicator to inform developmental surveillance with this medically fragile cohort. © 2017 Paediatrics and Child Health Division (The Royal Australasian College of Physicians).

  4. Nonselective carotid artery ultrasound screening in patients undergoing coronary artery bypass grafting: Is it necessary?

    PubMed Central

    Masabni, Khalil; Sabik, Joseph F.; Raza, Sajjad; Carnes, Theresa; Koduri, Hemantha; Idrees, Jay J.; Beach, Jocelyn; Riaz, Haris; Shishehbor, Mehdi H.; Gornik, Heather L.; Blackstone, Eugene H.

    2016-01-01

    Objectives To determine whether nonselective preoperative carotid artery ultrasound screening alters management of patients scheduled for coronary artery bypass grafting (CABG), and whether such screening affects neurologic outcomes. Methods From March 2011 to September 2013, preoperative carotid artery ultrasound screening was performed on 1236 of 1382 patients (89%) scheduled to undergo CABG. Carotid artery stenosis (CAS) was classified as none or mild (any type 0%–59% stenosis), moderate (unilateral 60%-79% stenosis), or severe (bilateral 60%-79% stenosis or unilateral 80%–100% stenosis). Results A total of 1069 (86%) hadtesting, and 1 (1.1%) underwent combined CABG + carotid endarterectomy (CEA); 11 (12%) had off-pump surgery. Of those with severe CAS, 18 (23%) had confirmatory testing, and 18 (23%) underwent combined CABG + CEA; 6 (7.8%) had off-pump surgery. Stroke occurred in 14 of 1069 (1.3%) patients with undergoing CABG + CEA and 3 of 148 (2.0%) undergoing CABG alone experienced stroke (P = .4). In patients with moderate CAS, stroke occurred in 1 of 11 (9.1%) off-pump and 1 of 79 (1.3%) on-pump patients (P = .2). In patients with severe CAS, stroke occurred in 1 of 6 (17%) off-pump and 1 of 71 (1.4%) on-pump patients (P = .15). Conclusions Routine preoperative carotid artery evaluation altered the management of a minority of patients undergoing CABG; this did not translate into perioperative stroke risk. Hence, a more targeted approach for preoperative carotid artery evaluation should be adopted. PMID:26586360

  5. Factors Related to Intention to Undergo Female Sterilization Among Married Women in Rural Kathmandu, Nepal

    PubMed Central

    Nanthamongkolchai, Sutham; Pitikultang, Supachai

    2016-01-01

    Background: Sterilization is most widely used fertility regulation method in Nepal. However, prevalence of uptake of female sterilization in central hilly region is less than the national average. The objective of the study was to explore the number and factors related to intention of married women to undergo female sterilization in rural Kathmandu which lies within central hilly region. Materials and Methods: This is a community based cross-sectional survey research conducted in rural area of Kathmandu valley. Two hundred and forty currently married women with at least one child of any age were interviewed using a structured pre-tested questionnaire. Results: More than four-fifth of the respondents intended to undergo sterilization. Almost two-third of them wanted to limit their family size by taking this option. More than one-third of women not-intending to undergo sterilization feared weakness after sterilization. Age of the respondents, duration of marriage, and number of living children were significantly associated with intention to undergo sterilization. 15-24 years age group were six times more likely to have the intention for sterilization (OR 6.79, CI 2.28-20.19) compared to age 35 years and above group. Mothers with less than 3 living children are about three times more likely to have the intention to undergo sterilization (OR 2.87, CI 1.3-6.33) compared to women with more than 2 living children. Women married for 6 to 10 years were three times more likely to have the intention (OR 3.0, CI 1.09-8.27). However, gender of the living children was not associated with intention to undergo sterilization. Conclusion: There were significant numbers of women intending to undergo sterilization. Age of the mother, number of living children and the duration of marriage were found to be significantly influencing the intention to undergo sterilization. However, as intention refers to future plan, the respondents’ intention may change over time. The national family

  6. Computational Test Cases for a Rectangular Supercritical Wing Undergoing Pitching Oscillations

    NASA Technical Reports Server (NTRS)

    Bennett, Robert M.; Walker, Charlotte E.

    1999-01-01

    Proposed computational test cases have been selected from the data set for a rectangular wing of panel aspect ratio two with a twelve-percent-thick supercritical airfoil section that was tested in the NASA Langley Transonic Dynamics Tunnel. The test cases include parametric variation of static angle of attack, pitching oscillation frequency, and Mach numbers from subsonic to transonic with strong shocks. Tables and plots of the measured pressures are presented for each case. This report provides an early release of test cases that have been proposed for a document that supplements the cases presented in AGARD Report 702.

  7. Functional Outcome Trajectories after Out-of Hospital Pediatric Cardiac Arrest

    PubMed Central

    Silverstein, Faye S; Slomine, Beth; Christensen, James; Holubkov, Richard; Page, Kent; Dean, J. Michael; Moler, Frank

    2016-01-01

    Objective To analyze functional performance measures collected prospectively during the conduct of a clinical trial that enrolled children (up to age 18 years), resuscitated after out-of-hospital cardiac arrest, who were at high risk for poor outcomes. Design Children with Glasgow Motor Scales <5, within 6 hours of resuscitation, were enrolled in a clinical trial that compared two targeted temperature management interventions (THAPCA-OH, NCT00878644). The primary outcome, 12-month survival with Vineland Adaptive Behavior Scales, second edition (VABS-II) score ≥70, did not differ between groups. Setting 38 North American pediatric ICU’s. Participants 295 children were enrolled; 270/295 had baseline VABS-II scores ≥70; 87/270 survived one year. Interventions Targeted temperatures were 33.0°C and 36.8°C for hypothermia and normothermia groups. Measurements and Main Results Baseline measures included VABS-II, Pediatric Cerebral Performance Category(PCPC), and Pediatric Overall Performance Category (POPC). PCPC and POPC were rescored at hospital discharges; all three were scored at 3 and 12 months. In survivors with baseline VABS-II scores ≥70, we evaluated relationships of hospital discharge PCPC with 3 and 12 month scores, and between 3 and 12 month VABS-II scores. Hospital discharge PCPC scores strongly predicted 3 and 12 month PCPC (r=0.82,0.79; p<0.0001) and VABS-II scores (r=−0.81,−0.77; p<0.0001) Three month VABS-II scores strongly predicted 12 month performance (r=0.95, p<0.0001). Hypothermia treatment did not alter these relationships. Conclusions In comatose children, with Glasgow Motor Scales <5 in the initial hours after out-of-hospital cardiac arrest resuscitation, function scores at hospital discharge and at 3 months predicted 12-month performance well in the majority of survivors. PMID:27509385

  8. Tranexamic Acid in Patients Undergoing Coronary-Artery Surgery.

    PubMed

    Myles, Paul S; Smith, Julian A; Forbes, Andrew; Silbert, Brendan; Jayarajah, Mohandas; Painter, Thomas; Cooper, D James; Marasco, Silvana; McNeil, John; Bussières, Jean S; McGuinness, Shay; Byrne, Kelly; Chan, Matthew T V; Landoni, Giovanni; Wallace, Sophie

    2017-01-12

    Tranexamic acid reduces the risk of bleeding among patients undergoing cardiac surgery, but it is unclear whether this leads to improved outcomes. Furthermore, there are concerns that tranexamic acid may have prothrombotic and proconvulsant effects. In a trial with a 2-by-2 factorial design, we randomly assigned patients who were scheduled to undergo coronary-artery surgery and were at risk for perioperative complications to receive aspirin or placebo and tranexamic acid or placebo. The results of the tranexamic acid comparison are reported here. The primary outcome was a composite of death and thrombotic complications (nonfatal myocardial infarction, stroke, pulmonary embolism, renal failure, or bowel infarction) within 30 days after surgery. Of the 4662 patients who were enrolled and provided consent, 4631 underwent surgery and had available outcomes data; 2311 were assigned to the tranexamic acid group and 2320 to the placebo group. A primary outcome event occurred in 386 patients (16.7%) in the tranexamic acid group and in 420 patients (18.1%) in the placebo group (relative risk, 0.92; 95% confidence interval, 0.81 to 1.05; P=0.22). The total number of units of blood products that were transfused during hospitalization was 4331 in the tranexamic acid group and 7994 in the placebo group (P<0.001). Major hemorrhage or cardiac tamponade leading to reoperation occurred in 1.4% of the patients in the tranexamic acid group and in 2.8% of the patients in the placebo group (P=0.001), and seizures occurred in 0.7% and 0.1%, respectively (P=0.002 by Fisher's exact test). Among patients undergoing coronary-artery surgery, tranexamic acid was associated with a lower risk of bleeding than was placebo, without a higher risk of death or thrombotic complications within 30 days after surgery. Tranexamic acid was associated with a higher risk of postoperative seizures. (Funded by the Australian National Health and Medical Research Council and others; ATACAS Australia New Zealand

  9. Aerial photo shows Launch Complex 39 Area

    NASA Technical Reports Server (NTRS)

    2000-01-01

    This aerial photo shows the areas recently opened as part of KSC's Safe Haven project. The curved road in the center is the newly restored crawlerway leading around the Vehicle Assembly Building (VAB) and Orbiter Processing Facility 3 (OPF-3) into the VAB high bay 2 (open on the lower right), where a mobile launcher platform/crawler-transporter currently sits. The Safe Haven project will enable the storage of orbiters during severe weather. OPF1 and OPF-2 are at the lower right. The crawlerway also extends from the east side of the VAB out to the two launch pads. Launch Pad 39A is visible to the left of the crawlerway. In the distance is the Atlantic Ocean. To the right of the VAB is the turn basin, into which ships tow the barge for offloading new external tanks from Louisiana.

  10. Mars Polar Lander undergoes testing in SAEF-2

    NASA Technical Reports Server (NTRS)

    1998-01-01

    In the Spacecraft Assembly and Encapsulation Facility-2 (SAEF-2), a KSC technician takes part in testing science instruments and basic spacecraft subsystems on the Mars Polar Lander. The solar- powered spacecraft, targeted for launch from Cape Canaveral Air Station aboard a Delta II rocket on Jan. 3, 1999, is designed to touch down on the Martian surface near the northern-most boundary of the south pole in order to study the water cycle there. The lander also will help scientists learn more about climate change and current resources on Mars, studying such things as frost, dust, water vapor and condensates in the Martian atmosphere.

  11. KSC-2011-1449

    NASA Image and Video Library

    2011-02-15

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers receive training atop a mast climber that is attached to launch simulation towers outside the Launch Equipment Test Facility. The training includes attaching carrier plates, water and air systems, and electricity to the climber to simulate working in Kennedy's Vehicle Assembly Building (VAB). Mast climbers can be substituted for fixed service structures currently inside the VAB to provide access to any type of launch vehicle. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. Last year, the facility underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator and a cryogenic system. Photo credit: NASA/Jim Grossmann

  12. KSC-2011-1446

    NASA Image and Video Library

    2011-02-15

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers receive training atop a mast climber that is attached to launch simulation towers outside the Launch Equipment Test Facility. The training includes attaching carrier plates, water and air systems, and electricity to the climber to simulate working in Kennedy's Vehicle Assembly Building (VAB). Mast climbers can be substituted for fixed service structures currently inside the VAB to provide access to any type of launch vehicle. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. Last year, the facility underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator and a cryogenic system. Photo credit: NASA/Jim Grossmann

  13. KSC-2011-1450

    NASA Image and Video Library

    2011-02-15

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, training takes place atop a mast climber that is attached to launch simulation towers outside the Launch Equipment Test Facility. The training includes attaching carrier plates, water and air systems, and electricity to the climber to simulate working in Kennedy's Vehicle Assembly Building (VAB). Mast climbers can be substituted for fixed service structures currently inside the VAB to provide access to any type of launch vehicle. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. Last year, the facility underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator and a cryogenic system. Photo credit: NASA/Jim Grossmann

  14. KSC-2011-1448

    NASA Image and Video Library

    2011-02-15

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers receive training atop a mast climber that is attached to launch simulation towers outside the Launch Equipment Test Facility. The training includes attaching carrier plates, water and air systems, and electricity to the climber to simulate working in Kennedy's Vehicle Assembly Building (VAB). Mast climbers can be substituted for fixed service structures currently inside the VAB to provide access to any type of launch vehicle. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. Last year, the facility underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator and a cryogenic system. Photo credit: NASA/Jim Grossmann

  15. KSC-2011-1447

    NASA Image and Video Library

    2011-02-15

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, workers receive training on a mast climber that is attached to launch simulation towers outside the Launch Equipment Test Facility. The training includes attaching carrier plates, water and air systems, and electricity to the climber to simulate working in Kennedy's Vehicle Assembly Building (VAB). Mast climbers can be substituted for fixed service structures currently inside the VAB to provide access to any type of launch vehicle. Since 1977, the facility has supported NASA’s Launch Services, shuttle, International Space Station, and Constellation programs, as well as commercial providers. Last year, the facility underwent a major upgrade to support even more programs, projects and customers. It houses a 6,000-square-foot high bay, cable fabrication and molding shop, pneumatics shop, machine and weld shop and full-scale control room. Outside, the facility features a water flow test loop, vehicle motion simulator and a cryogenic system. Photo credit: NASA/Jim Grossmann

  16. Patients' Views of Treatment-Focused Genetic Testing (TFGT): Some Lessons for the Mainstreaming of BRCA1 and BRCA2 Testing.

    PubMed

    Wright, Sarah; Porteous, Mary; Stirling, Diane; Lawton, Julia; Young, Oliver; Gourley, Charlie; Hallowell, Nina

    2018-05-11

    This paper explores patients' views and experiences of undergoing treatment-focused BRCA1 and BRCA2 genetic testing (TFGT), either offered following triaging to clinical genetics (breast cancer) or as part of a mainstreamed care pathway in oncology (ovarian cancer). Drawing on 26 in-depth interviews with patients with breast or ovarian cancer who had undergone TFGT, this retrospective study examines patients' views of genetic testing at this point in their care pathway, focusing on issues, such as initial response to the offer of testing, motivations for undergoing testing, and views on care pathways. Patients were amenable to the incorporation of TFGT at an early stage in their cancer care irrespective of (any) prior anticipation of having a genetic test or family history. While patients were glad to have been offered TFGT as part of their care, some questioned the logic of the test's timing in relation to their cancer treatment. Crucially, patients appeared unable to disentangle the treatment role of TFGT from its preventative function for self and other family members, suggesting that some may undergo TFGT to obtain information for others rather than for self.

  17. KENNEDY SPACE CENTER, FLA. -- Endeavour backs out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- Endeavour backs out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  18. Operational Lessons Learned from the Ares I-X Flight Test

    NASA Technical Reports Server (NTRS)

    Davis, Stephan R.

    2010-01-01

    The Ares I-X flight test, launched in 2009, is the first test of the Ares I crew launch vehicle. This development flight test evaluated the flight dynamics, roll control, and separation events, but also provided early insights into logistical, stacking, launch, and recovery operations for Ares I. Operational lessons will be especially important for NASA as the agency makes the transition from the Space Shuttle to the Constellation Program, which is designed to be less labor-intensive. The mission team itself comprised only 700 individuals over the life of the project compared to the thousands involved in Shuttle and Apollo missions; while missions to and beyond low-Earth orbit obviously will require additional personnel, this lean approach will serve as a model for future Constellation missions. To prepare for Ares I-X, vehicle stacking and launch infrastructure had to be modified at Kennedy Space Center's Vehicle Assembly Building (VAB) as well as Launch Complex (LC) 39B. In the VAB, several platforms and other structures designed for the Shuttle s configuration had to be removed to accommodate the in-line, much taller Ares I-X. Vehicle preparation activities resulted in delays, but also in lessons learned for ground operations personnel, including hardware deliveries, cable routing, transferred work and custodial paperwork. Ares I-X also proved to be a resource challenge, as individuals and ground service equipment (GSE) supporting the mission also were required for Shuttle or Atlas V operations at LC 40/41 at Cape Canaveral Air Force Station. At LC 39B, several Shuttle-specific access arms were removed and others were added to accommodate the in-line Ares vehicle. Ground command, control, and communication (GC3) hardware was incorporated into the Mobile Launcher Platform (MLP). The lightning protection system at LC 39B was replaced by a trio of 600-foot-tall towers connected by a catenary wire to account for the much greater height of the vehicle. Like Shuttle

  19. OPALS Final Testing

    NASA Image and Video Library

    2014-07-24

    Optical PAyload for Lasercomm Science OPALS flight terminal undergoes final testing at NASA Jet Propulsion Laboratory. OPALS was launched to the International Space Station from Cape Canaveral Air Force Station in Florida on April 18, 2014.

  20. KSC-2011-3035

    NASA Image and Video Library

    2011-04-25

    CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank for space shuttle Atlantis' STS-135 mission, ET-138, is prepared for transfer from its test cell to high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller

  1. KSC-2011-3038

    NASA Image and Video Library

    2011-04-25

    CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lifted from its test cell for transfer to high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller

  2. KSC-2011-3034

    NASA Image and Video Library

    2011-04-25

    CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank for space shuttle Atlantis' STS-135 mission, ET-138, is prepared for transfer from its test cell to high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller

  3. KSC-2011-3037

    NASA Image and Video Library

    2011-04-25

    CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, is lifted from its test cell for transfer to high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller

  4. Effects of different types of pharyngeal packing in patients undergoing nasal surgery: A comparative study.

    PubMed

    Rizvi, Mohd Meesam; Singh, Raj Bahadur; Rasheed, Mohd Asim; Sarkar, Arindam

    2015-01-01

    Postoperative throat complaints such as postoperative sore throat (POST), dysphagia, and hoarseness frequently arises after tracheal intubation and throat packing for patient undergoing general anesthesia. This condition is very disturbing to patient. Avoiding POST is a major priority for these patients because preventing postoperative complications contributes to patient satisfaction. To describe and analyze the postoperative throat effects of nasopharyngeal packing and oropharyngeal packing in patients undergoing nasal surgery. A randomized comparative study. After obtaining approval of Ethical Committee 40 patients were included in study. After this patient were randomly allocated into two groups of 20 each. Group A - in which the oropharynx was packed and Group B - inwhich the nasopharynx was packed. General anesthesia were given and throat packing was done and patients were interviewed postoperatively for any throat complications such as sore throat, difficulty in swallowing (dysphagia), hoarseness of voice, throat irritation, and any other symptom pertaining to the study were noted and data were analyzed. T-test to compare the age, while Chi-square test and Fisher's exact test were used to compare sex distribution, sore throat, dysphagia, hoarseness, and throat irritation. Results showed statistically significant difference in incidence and severity of POST in Group A patients when compared to Group B patients to be more. Patients in Group A had a higher incidence of dysphagia when compared to their Group B counterparts. With respect to the incidence of hoarseness and throat irritation, there was no statistical significance between the groups. We concluded that the site of pharyngeal packing influences the incidence and severity of POST and as well as the incidence of dysphagia after general anesthesia. The use of nasopharyngeal packing in the patients undergoing nasal surgeries might lead to a reduction of the same.

  5. Test uptake and case detection of syphilis, HIV, and hepatitis C among women undergoing prenatal screening in British Columbia, 2007 to 2011.

    PubMed

    Kuo, Margot; Money, Deborah M; Alvarez, Maria; Buxton, Jane A; Krajden, Mel; Lester, Richard T; Ogilvie, Gina; Gilbert, Mark

    2014-06-01

    Test uptake and case detection trends for rubella, syphilis, HIV, and hepatitis C (HCV) were compared among the 2007 to 2011 cohort of women undergoing prenatal testing in British Columbia. Analysis involved linkage of provincially centralized laboratory and surveillance data to assess prenatal test uptake and rates of newly diagnosed versus prevalent infections. We included prenatal specimens submitted from BC women aged 16 to 45 years in 2007 to 2011. Laboratory records were linked to provincial surveillance systems to identify confirmed maternal syphilis and HIV cases. Previous positive status was determined for HIV and HCV if a prior confirmed case was identified from laboratory records. We determined rates of HIV and HCV newly identified at prenatal screening (new diagnoses per 100 000 per year). Prevalence for HIV and HCV was the sum of all new and prior diagnoses (prevalence per 100 000 per year). Of 233 203 women, 96.9% were screened for rubella, 93.3% for syphilis, 93.8% for HIV, and 21.5% for HCV. From 2007 to 2011, the overall rates of new diagnoses were 15.4, 5.1, and 82.8 cases per 100 000 per year for syphilis, HIV, and HCV, respectively. The overall prevalence was 45.9 and 551.5 cases per 100 000 per year for HIV and HCV, respectively (0.05% and 0.6%). From 2007 to 2011, new diagnoses of HCV decreased 40% from 106.0 to 62.1 cases per 100 000 per year. HCV prevalence did not change and increased with maternal age. This study links surveillance and laboratory data to provide a provincial picture of prenatal screening test uptake and case detection, with the advantage of distinguishing new from prior diagnoses. This information can help guide prenatal communicable disease screening policy.

  6. Comparing exercise responses to aerobic plus resistance training between postmenopausal breast cancer survivors undergoing aromatase inhibitor therapy and healthy women.

    PubMed

    Paulo, Thais R S de; Winters-Stone, Kerri M; Viezel, Juliana; Rossi, Fabricio E; Aro, Bruna L; Trindade, Ana Carolina A C; Codogno, Jamile S; Freitas Junior, Ismael F

    2018-04-12

    The aim of this study was to explore whether postmenopausal breast cancer survivors undergoing aromatase inhibitor therapy differ from healthy postmenopausal women in their response to the same aerobic + resistance training. The participants were separated into two groups: postmenopausal breast cancer survivors undergoing aromatase inhibitor therapy for an average of 20 months (18 women) and healthy postmenopausal women (24 women). We assessed aerobic capacity (predicted maximum oxygen uptake (VO 2 max) and maximum running velocity test (Vmax)) through a walking test, upper and lower body muscle strength using an estimated one-repetition maximum test, and body composition by dual-energy X-ray absorptiometry at baseline and at three, six, and nine months, respectively. The exercise program was performed three times/week over nine months and consisted of 40 min of machine-based strength training (seated cable row, bench press, leg extension, leg press, and leg curl, as well as bridge, abdominal, and standard plank exercises) followed by 30 min of treadmill walking. Analysis of variance (ANOVA) with repeated measures was used to compare the groups over time. Postmenopausal breast cancer survivors undergoing aromatase inhibitor therapy and healthy postmenopausal women presented similar improvements in estimated lower body strength, predicted VO 2max and V max , and body fat mass. For maximal upper body strength, there was a significant group x time interaction after six months of training (p = 0.01). The healthy postmenopausal women presented a significant increase in upper body strength after six months, while postmenopausal breast cancer survivors undergoing aromatase inhibitor therapy demonstrated an improvement only at nine months of training. The breast cancer survivors undergoing aromatase inhibitor therapy presented increased lean mass while healthy postmenopausal women maintained values over time (Breast cancer: 33.7 ± 3.9(Pre) vs. 34.1

  7. VALIDITY AND RELIABILITY OF THE SPIRITUAL COPING STRATEGIES SCALE ARABIC VERSION IN SAUDI PATIENTS UNDERGOING HAEMODIALYSIS.

    PubMed

    Cruz, Jonas P; Baldacchino, Donia R; Alquwez, Nahed

    2016-06-01

    Patients often resort to religious and spiritual activities to cope with physical and mental challenges. The effect of spiritual coping on overall health, adaptation and health-related quality of life among patients undergoing haemodialysis (HD) is well documented. Thus, it is essential to establish a valid and reliable instrument that can assess both the religious and non-religious coping methods in patients undergoing HD. This study aimed to assess the validity and reliability of the Spiritual Coping Strategies Scale Arabic version (SCS-A) in Saudi patients undergoing HD. A convenience sample of 60 Saudi patients undergoing HD was recruited for this descriptive, cross-sectional study. Data were collected between May and June 2015. Forward-backward translation was used to formulate the SCS-A. The SCS-A, Muslim Religiosity Scale and the Quality of Life Index Dialysis Version III were used to procure the data. Internal consistency reliability, stability reliability, factor analysis and construct validity tests were performed. Analyses were set at the 0.05 level of significance. The SCS-A showed an acceptable internal consistency and strong stability reliability over time. The EFA produced two factors (non-religious and religious coping). Satisfactory construct validity was established by the convergent and divergent validity and known-groups method. The SCS-A is a reliable and valid tool that can be used to measure the religious and non-religious coping strategies of patients undergoing HD in Saudi Arabia and other Muslim and Arabic-speaking countries. © 2016 European Dialysis and Transplant Nurses Association/European Renal Care Association.

  8. Test-Taking Skills of Secondary Students: The Relationship with Motivation, Attitudes, Anxiety and Attitudes towards Tests

    ERIC Educational Resources Information Center

    Dodeen, Hamzeh M.; Abdelfattah, Faisal; Alshumrani, Saleh

    2014-01-01

    Test-taking skills are cognitive skills that enable students to undergo any test-taking situation in an appropriate manner. This study is aimed at assessing the relationship between students' test-taking skills and each of the following variables: motivation to learn mathematics; mathematics anxiety; attitudes towards mathematics; and attitudes…

  9. Simulant Agent Resistance Test Manikin (SMARTMAN) Testing of Protective Mask Systems

    DTIC Science & Technology

    2013-09-16

    after approval of the test plan and conduct of the test readiness review (TRR) or equivalent, and/or other installation pretest reviews. 3.1.1...to various types of pre- test conditioning. The number of masks chosen to represent each type of pretest conditioning will be divided (equally...This does not negate the pretest conditioning. TOP 08-2-109 16 September 2013 8 a. Masks undergoing BFC conditioning will be conditioned before

  10. Exercise-induced hypertension, cardiovascular events, and mortality in patients undergoing exercise stress testing: a systematic review and meta-analysis.

    PubMed

    Schultz, Martin G; Otahal, Petr; Cleland, Verity J; Blizzard, Leigh; Marwick, Thomas H; Sharman, James E

    2013-03-01

    The prognostic relevance of a hypertensive response to exercise (HRE) is ill-defined in individuals undergoing exercise stress testing. The study described here was intended to provide a systematic review and meta-analysis of published literature to determine the value of exercise-related blood pressure (BP) (independent of office BP) for predicting cardiovascular (CV) events and mortality. Online databases were searched for published longitudinal studies reporting exercise-related BP and CV events and mortality rates. We identified for review 12 longitudinal studies with a total of 46,314 individuals without significant coronary artery disease, with total CV event and mortality rates recorded over a mean follow-up of 15.2±4.0 years. After adjustment for age, office BP, and CV risk factors, an HRE at moderate exercise intensity carried a 36% greater rate of CV events and mortality (95% CI, 1.02-1.83, P = 0.039) than that of subjects without an HRE. Additionally, each 10mm Hg increase in systolic BP during exercise at moderate intensity was accompanied by a 4% increase in CV events and mortality, independent of office BP, age, or CV risk factors (95% CI, 1.01-1.07, P = 0.02). Systolic BP at maximal workload was not significantly associated with the outcome of an increased rate of CV, whether analyzed as a categorical (HR=1.49, 95% CI, 0.90-2.46, P = 0.12) or a continuous (HR=1.01, 95% CI, 0.98-1.04, P = 0.53) variable. An HRE at moderate exercise intensity during exercise stress testing is an independent risk factor for CV events and mortality. This highlights the need to determine underlying pathophysiological mechanisms of exercise-induced hypertension.

  11. Assessments Used to Diagnose Developmental Coordination Disorder: Do Their Underlying Constructs Match the Diagnostic Criteria?

    ERIC Educational Resources Information Center

    Darsaklis, Vasiliki; Snider, Laurie M.; Majnemer, Annette; Mazer, Barbara

    2013-01-01

    This study examined the constructs underlying the Movement Assessment Battery for Children-2 (M-ABC-2), Bruninks-Oseretsky Test of Motor Proficiency (BOTMP) and Vineland Adaptive Behavior Scale-2 (VABS-2) using the framework of the International Classification of Functioning Disability and Health--Child Youth version (ICF-CY) and the diagnostic…

  12. Electromyography function, disability degree, and pain in leprosy patients undergoing neural mobilization treatment.

    PubMed

    Véras, Larissa Sales Téles; Vale, Rodrigo Gomes de Souza; Mello, Danielli Braga de; Castro, José Adail Fonseca de; Lima, Vicente; Trott, Alexis; Dantas, Estélio Henrique Martin

    2012-02-01

    This study aimed to evaluate the effect of the neural mobilization technique on electromyography function, disability degree, and pain in patients with leprosy. A sample of 56 individuals with leprosy was randomized into an experimental group, composed of 29 individuals undergoing treatment with neural mobilization, and a control group of 27 individuals who underwent conventional treatment. In both groups, the lesions in the lower limbs were treated. In the treatment with neural mobilization, the procedure used was mobilization of the lumbosacral roots and sciatic nerve biased to the peroneal nerve that innervates the anterior tibial muscle, which was evaluated in the electromyography. Analysis of the electromyography function showed a significant increase (p<0.05) in the experimental group in both the right (Δ%=22.1, p=0.013) and the left anterior tibial muscles (Δ%=27.7, p=0.009), compared with the control group pre- and post-test. Analysis of the strength both in the movement of horizontal extension (Δ%right=11.7, p=0.003/Δ%left=27.4, p=0.002) and in the movement of back flexion (Δ%right=31.1; p=0.000/Δ%left=34.7, p=0.000) showed a significant increase (p<0.05) in both the right and the left segments when comparing the experimental group pre- and post-test. The experimental group showed a significant reduction (p=0.000) in pain perception and disability degree when the pre- and post-test were compared and when compared with the control group in the post-test. Leprosy patients undergoing the technique of neural mobilization had an improvement in electromyography function and muscle strength, reducing disability degree and pain.

  13. Development of an occupational advice intervention for patients undergoing lower limb arthroplasty (the OPAL study).

    PubMed

    Baker, Paul; Coole, Carol; Drummond, Avril; McDaid, Catriona; Khan, Sayeed; Thomson, Louise; Hewitt, Catherine; McNamara, Iain; McDonald, David; Fitch, Judith; Rangan, Amar

    2018-06-28

    There are an increasing number of patients of working age undergoing hip and knee replacements. Currently there is variation in the advice and support given about sickness absence, recovery to usual activities and return to work after these procedures. Earlier, sustainable, return to work improves the health of patients and benefits their employers and society. An intervention that encourages and supports early recovery to usual activities, including work, has the potential to reduce the health and socioeconomic burden of hip and knee replacements. A two-phase research programme delivered over 27 months will be used to develop and subsequently test the feasibility of an occupational advice intervention to facilitate return to work and usual activities in patients undergoing lower limb arthroplasty. The 2 phases will incorporate a six-stage intervention mapping process: Phase 1: Intervention mapping stages 1-3: 1 Needs assessment (including rapid evidence synthesis, prospective cohort analysis and structured stakeholder interviews) 2 Identification of intended outcomes and performance objectives 3 Selection of theory-based methods and practical strategies Phase 2: Intervention mapping stages 4-6: 4 Development of components and materials for the occupational advice intervention using a modified Delphi process 5 Adoption and implementation of the intervention 6 Evaluation and feasibility testing The study will be undertaken in four National Health Service (NHS) hospitals in the United Kingdom and two Higher Education Institutions. OPAL (Occupational advice for Patients undergoing Arthroplasty of the Lower limb) aims to develop an occupational advice intervention to support early recovery to usual activities including work, which is tailored to the requirements of patients undergoing hip and knee replacements. The developed intervention will then be assessed with a specific focus on evaluating its feasibility as a potential trial intervention to improve speed of

  14. Nonselective carotid artery ultrasound screening in patients undergoing coronary artery bypass grafting: Is it necessary?

    PubMed

    Masabni, Khalil; Sabik, Joseph F; Raza, Sajjad; Carnes, Theresa; Koduri, Hemantha; Idrees, Jay J; Beach, Jocelyn; Riaz, Haris; Shishehbor, Mehdi H; Gornik, Heather L; Blackstone, Eugene H

    2016-02-01

    To determine whether nonselective preoperative carotid artery ultrasound screening alters management of patients scheduled for coronary artery bypass grafting (CABG), and whether such screening affects neurologic outcomes. From March 2011 to September 2013, preoperative carotid artery ultrasound screening was performed on 1236 of 1382 patients (89%) scheduled to undergo CABG. Carotid artery stenosis (CAS) was classified as none or mild (any type 0%-59% stenosis), moderate (unilateral 60%-79% stenosis), or severe (bilateral 60%-79% stenosis or unilateral 80%-100% stenosis). A total of 1069 (86%) had testing, and 1 (1.1%) underwent combined CABG + carotid endarterectomy (CEA); 11 (12%) had off-pump surgery. Of those with severe CAS, 18 (23%) had confirmatory testing, and 18 (23%) underwent combined CABG + CEA; 6 (7.8%) had off-pump surgery. Stroke occurred in 14 of 1069 (1.3%) patients with undergoing CABG + CEA and 3 of 148 (2.0%) undergoing CABG alone experienced stroke (P = .4). In patients with moderate CAS, stroke occurred in 1 of 11 (9.1%) off-pump and 1 of 79 (1.3%) on-pump patients (P = .2). In patients with severe CAS, stroke occurred in 1 of 6 (17%) off-pump and 1 of 71 (1.4%) on-pump patients (P = .15). Routine preoperative carotid artery evaluation altered the management of a minority of patients undergoing CABG; this did not translate into perioperative stroke risk. Hence, a more targeted approach for preoperative carotid artery evaluation should be adopted. Copyright © 2016 The American Association for Thoracic Surgery. Published by Elsevier Inc. All rights reserved.

  15. Serum adipokines and HIV viral replication in patients undergoing antiretroviral therapy

    PubMed Central

    Aramă, Victoria; Tilişcan, Cătălin; Ion, Daniela Adriana; Mihăilescu, Raluca; Munteanu, Daniela; Streinu-Cercel, Anca; Tudor, Ana Maria; Hristea, Adriana; Leoveanu, Viorica; Olaru, Ioana; Aramă, Ştefan Sorin

    2012-01-01

    Introduction Several studies have reported that cytokines secreted by adipose tissue (adipokines) may be linked to HIV replication. The aim of the study was to evaluate the relationship between HIV replication and serum levels of adipokines, in a Caucasian HIV-infected population of men and women undergoing complex antiretroviral therapy. Methods A cross-sectional study was conducted in an unselected sample of 77 HIV-1-positive patients. Serum adipokines levels were measured including circulating adiponectin, leptin, resistin, tumor necrosis factor alpha (TNF-alpha) and interleukin-6 (IL-6). Patients were divided into two groups: Group 1 - with undetectable viral load and Group 2 - with persistent HIV viral replication. Differences between groups ? were tested using independent-sample t-test for Gaussian variables and Mann–Whitney–Wilcoxon test for non-parametric variables. Pearson's chi-squared test was used for correlation analysis. Results A total of 77 patients (age range: 17-65, mean: 32.5 years) including 44 men (57.1% men, age range: 17–63 years, mean: 34.1 years) and 33 women (42.9% women age range: 19–65 years, mean: 30.3 years) were included in the study. TNF-alpha had significantly higher serum levels in patients with detectable viral load (16.89 vs. 9.35 pg/mL), (p=0.043), but correlation analysis lacked statistical significance. Adiponectin had median serum levels of 9.22 ìg/mL in Group 1 vs. 16.50 ìg/mL in Group 2 but the results lacked statistical significance (p=0.059). Higher leptin, IL-6 and resistin serum levels were noted in patients with undetectable HIV viral load, without statistical significance. Conclusions The present study reported higher TNF-alpha serum levels in patients with persistent HIV viral load. We found no statistically significant correlations between adiponectin, leptin, resistin and IL-6 and HIV viral load in our Caucasian HIV-positive study population, undergoing antiretroviral therapy. PMID:24432258

  16. Calcium and Vitamin D Supplementation and Loss of Bone Mineral Density in Women Undergoing Breast Cancer Therapy

    PubMed Central

    Datta, Mridul; Schwartz, Gary G.

    2013-01-01

    An unintended consequence of breast cancer therapies is an increased risk of osteoporosis due to accelerated bone loss. We conducted a systematic review of calcium and/or vitamin D (Ca±D) supplementation trials for maintaining bone mineral density (BMD) in women with breast cancer using the “before-after” data from the Ca±D supplemented comparison group of trials evaluating the effect of drugs such as bisphosphonates on BMD. Whether Ca±D supplements increase BMD in women undergoing breast cancer therapy has never been tested against an unsupplemented control group. However, results from 16 trials indicate that the Ca±D doses tested (500-1500 mg calcium; 200-1000 IU vitamin D) were inadequate to prevent BMD loss in these women. Cardiovascular disease is the main cause of mortality in women with breast cancer. Because calcium supplements may increase cardiovascular disease risk, future trials should evaluate the safety and efficacy of Ca±D supplementation in women undergoing breast cancer therapy. PMID:23932583

  17. U.S. Forest Service termiticide tests

    Treesearch

    Terence Wagner

    2003-01-01

    The U.S. Forest Service has been testingchemicals for termite control since 1939. Today its termiticide testing program is nationally recognized for providing unbiased efficacy data for product registration using standardized tests, sites, and evaluation procedures. Virtually all termiticides undergo Forest Service testing before being registered by EPA. Termiticides...

  18. 14 CFR 33.83 - Vibration test.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 1 2012-01-01 2012-01-01 false Vibration test. 33.83 Section 33.83... STANDARDS: AIRCRAFT ENGINES Block Tests; Turbine Aircraft Engines § 33.83 Vibration test. (a) Each engine must undergo vibration surveys to establish that the vibration characteristics of those components that...

  19. Aerial photo shows Launch Complex 39 Area

    NASA Technical Reports Server (NTRS)

    2000-01-01

    This aerial photo captures many of the facilities involved in Space Shuttle launches. At center is the Vehicle Assembly Building (VAB). The curved road on the near side is the newly restored crawlerway leading into the VAB high bay 2, where a mobile launcher platform/crawler-transporter currently sits. The road restoration and high bay 2 are part of KSC's Safe Haven project, enabling the storage of orbiters during severe weather. The road circles around the Orbiter Processing Facility 3 (OPF-3) at left center. OPF1 and OPF-2 are just below the curving road. The crawlerway also extends from the east side of the VAB out to the two launch pads, only one visible to the left of the VAB. In the distance is the Atlantic Ocean. To the right of the far crawlerway is the turn basin, into which ships tow the barge for offloading new external tanks from Louisiana.

  20. A targeted decision aid for the elderly to decide whether to undergo colorectal cancer screening: development and results of an uncontrolled trial

    PubMed Central

    2010-01-01

    Background Competing causes of mortality in the elderly decrease the potential net benefit from colorectal cancer screening and increase the likelihood of potential harms. Individualized decision making has been recommended, so that the elderly can decide whether or not to undergo colorectal cancer (CRC) screening. The objective is to develop and test a decision aid designed to promote individualized colorectal cancer screening decision making for adults age 75 and over. Methods We used formative research and cognitive testing to develop and refine the decision aid. We then tested the decision aid in an uncontrolled trial. The primary outcome was the proportion of patients who were prepared to make an individualized decision, defined a priori as having adequate knowledge (10/15 questions correct) and clear values (25 or less on values clarity subscale of decisional conflict scale). Secondary outcomes included overall score on the decisional conflict scale, and preferences for undergoing screening. Results We enrolled 46 adults in the trial. The decision aid increased the proportion of participants with adequate knowledge from 4% to 52% (p < 0.01) and the proportion prepared to make an individualized decision from 4% to 41% (p < 0.01). The proportion that preferred to undergo CRC screening decreased from 67% to 61% (p = 0. 76); 7 participants (15%) changed screening preference (5 against screening, 2 in favor of screening) Conclusion In an uncontrolled trial, the elderly participants appeared better prepared to make an individualized decision about whether or not to undergo CRC screening after using the decision aid. PMID:20849625

  1. Boeing CST-100 Heat Shield Testing

    NASA Image and Video Library

    2017-05-31

    A heat shield is used during separation test activities with Boeing's Starliner structural test article. The test article is undergoing rigorous qualification testing at the company's Huntington Beach Facility in California. Boeing’s CST-100 Starliner will launch on the Atlas V rocket to the International Space Station as part of NASA’s Commercial Crew Program.

  2. Apparent Diffusion Coefficient Value Changes and Clinical Correlation in 90 Cases of Cytomegalovirus-Infected Fetuses with Unremarkable Fetal MRI Results.

    PubMed

    Kotovich, D; Guedalia, J S B; Hoffmann, C; Sze, G; Eisenkraft, A; Yaniv, G

    2017-07-01

    Cytomegalovirus is the leading intrauterine infection. Fetal MR imaging is an accepted tool for fetal brain evaluation, yet it still lacks the ability to accurately predict the extent of the neurodevelopmental impairment, especially in fetal MR imaging scans with unremarkable findings. Our hypothesis was that intrauterine cytomegalovirus infection causes diffusional changes in fetal brains and that those changes may correlate with the severity of neurodevelopmental deficiencies. A retrospective analysis was performed on 90 fetal MR imaging scans of cytomegalovirus-infected fetuses with unremarkable results and compared with a matched gestational age control group of 68 fetal head MR imaging scans. ADC values were measured and averaged in the frontal, parietal, occipital, and temporal lobes; basal ganglia; thalamus; and pons. For neurocognitive assessment, the Vineland Adaptive Behavior Scales, Second Edition (VABS-II) was used on 58 children in the cytomegalovirus-infected group. ADC values were reduced for the cytomegalovirus-infected fetuses in most brain areas studied. The VABS-II showed no trend for the major domains or the composite score of the VABS-II for the cytomegalovirus-infected children compared with the healthy population distribution. Some subdomains showed an association between ADC values and VABS-II scores. Cytomegalovirus infection causes diffuse reduction in ADC values in the fetal brain even in unremarkable fetal MR imaging scans. Cytomegalovirus-infected children with unremarkable fetal MR imaging scans do not deviate from the healthy population in the VABS-II neurocognitive assessment. ADC values were not correlated with VABS-II scores. However, the lack of clinical findings, as seen in most cytomegalovirus-infected fetuses, does not eliminate the possibility of future neurodevelopmental pathology. © 2017 by American Journal of Neuroradiology.

  3. KSC-2012-5891

    NASA Image and Video Library

    2012-10-19

    CAPE CANAVERAL, Fla. – An Orion mockup spacecraft atop its service module simulator is lifted in the transfer aisle of the Vehicle Assembly Building, or VAB, at NASA's Kennedy Space Center in Florida. The Orion mockup is exact in details on the outside, but mostly empty on the inside. The work in the VAB is crucial to making sure the designs are accurate. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on a Space Launch System rocket. For more information, visit http://www.nasa.gov/orion Photo credit: NASA/ Dmitri Gerondidakis

  4. KSC-2011-3036

    NASA Image and Video Library

    2011-04-25

    CAPE CANAVERAL, Fla. - In the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida, workers monitor the progress of external fuel tank, ET-138, for space shuttle Atlantis' STS-135 mission, as it is lifted from its test cell for transfer to high bay-1 for joining with the twin solid rocket boosters on the mobile launcher platform. Shuttle Atlantis' move, or "rollover," from Orbiter Processing Facility-1 to the VAB is targeted for May 10. Once there it will be mated with the external tank and boosters. Atlantis and its crew of four will deliver the Raffaello multipurpose logistics module packed with supplies and spare parts to the International Space Station. STS-135 is targeted to launch June 28, and will be the last spaceflight for the Space Shuttle Program. Photo credit: NASA/Jack Pfaller

  5. Timeline of Events for Planetary Landing Test

    NASA Image and Video Library

    2014-06-06

    The saucer-shaped test vehicle for NASA Low-Density Supersonic Decelerator LDSD will undergo a series of events in the skies above Hawaii, with the ultimate goal of testing future landing technologies for Mars missions.

  6. Ab initio quantum chemical study of electron transfer in carboranes

    NASA Astrophysics Data System (ADS)

    Pati, Ranjit; Pineda, Andrew C.; Pandey, Ravindra; Karna, Shashi P.

    2005-05-01

    The electron transfer (ET) properties of 10- and 12-vertex carboranes are investigated by the ab initio Hartree-Fock method within the Marcus-Hush (MH) two-state model and the Koopman theorem (KT) approach. The calculated value of the ET coupling matrix element, VAB, is consistently higher in the KT approach than in the MH two-state model. For the carborane molecules functionalized by -CH 2 groups at C-vertices, VAB strongly depends on the relative orientation of the planes containing the terminal -CH 2 groups. The predicted conformation dependence of VAB offers a molecular mechanism to control ET between two active centers in molecular systems.

  7. KENNEDY SPACE CENTER, FLA. -- Endeavour begins rolling out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- Endeavour begins rolling out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  8. KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis rolls into the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis rolls into the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  9. KENNEDY SPACE CENTER, FLA. -- Endeavour is ready to be rolled out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- Endeavour is ready to be rolled out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  10. KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis rolls toward the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis rolls toward the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  11. Foreign Language Classroom Anxiety among China Chinese Students Undergoing the Laureate English Programme in INTI International University, Malaysia

    ERIC Educational Resources Information Center

    Ampalagan, Meghavaani d/o; Sellupillai, Mogana d/o; Yap, Sze Sze

    2014-01-01

    The purpose of this study was to investigate the relationship between foreign language classroom anxiety (communication apprehension, test anxiety and fear of negative evaluation) among Mainland Chinese students undergoing the Laureate English Programme in INTI International University, Malaysia. The participants of this study consisted of 75…

  12. [The Relationship Between Coping Behaviors and Symptom Distress in Elderly Patients With Cancer Undergoing Initial Chemotherapy].

    PubMed

    Wu, Shih-Ping; Hsu, Ya-Chuan

    2016-12-01

    Elderly cancer patients undergoing initial chemotherapy often suffer discomfort from medication-related symptom distress. This discomfort may affect treatment responses and outcomes negatively. This correlational, cross-sectional design study used a purposive sample of 100 patients who were both over 60 years of age and currently undergoing initial chemotherapy. The participants completed a structured questionnaire that was administered at a medical center in southern Taiwan. The questionnaire included a demographics datasheet, Coping Behavior Scale, and Symptom Distress Scale. Data was analyzed using descriptive statistics, Pearson's correlations, Mann-Whitney U, and Kruskal Wallis tests, which were run on SPSS 19.0 software. This correlational, cross-sectional design study used a purposive sample of 100 patients who were both over 60 years of age and currently undergoing initial chemotherapy. The participants completed a structured questionnaire that was administered at a medical center in southern Taiwan. The questionnaire included a demographics datasheet, Coping Behavior Scale, and Symptom Distress Scale. Data was analyzed using descriptive statistics, Pearson's correlations, Mann-Whitney U, and Kruskal Wallis tests, which were run on SPSS 19.0 software. Three-quarters (78%) of participants reported that they suffered from more than four distress symptoms. The top distress symptoms in terms of severity included: fatigue, poor appetite, insomnia, dry mouth, and altered bowel habits. The top distress symptoms in terms of frequency included: fatigue, dry mouth, poor appetite, insomnia, and altered bowel habits. "Problem-focused" coping was the most frequent type of coping behavior (mean = 3.19, SD = 0.24) that was used by participants. Furthermore, more frequent use of "emotions-focused" coping behaviors was associated with a greater risk of experiencing serious distress symptoms (r =.44, p < .001). Number of chronic diseases, cancer stage, and type of cancer

  13. Providing Preoperative Information for Children Undergoing Surgery: A Randomized Study Testing Different Types of Educational Material to Reduce Children's Preoperative Worries

    ERIC Educational Resources Information Center

    Fernandes, S. C.; Arriaga, P.; Esteves, F.

    2014-01-01

    This study developed three types of educational preoperative materials and examined their efficacy in preparing children for surgery by analysing children's preoperative worries and parental anxiety. The sample was recruited from three hospitals in Lisbon and consisted of 125 children, aged 8-12 years, scheduled to undergo outpatient surgery. The…

  14. Voyager Proof Test Model and Cleanroom

    NASA Image and Video Library

    1977-01-12

    This archival photo shows the Voyager Proof Test Model (in the foreground right of center) undergoing a mechanical preparation and weight center of gravity test at NASA's Jet Propulsion Laboratory, Pasadena, California, on January 12, 1977. https://photojournal.jpl.nasa.gov/catalog/PIA21476

  15. KSC-2010-5887

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett

  16. KSC-2010-5888

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett

  17. Obesity paradox in patients undergoing coronary intervention: A review

    PubMed Central

    Patel, Nirav; Elsaid, Ossama; Shenoy, Abhishek; Sharma, Abhishek; McFarlane, Samy I

    2017-01-01

    There is strong relationship exist between obesity and cardiovascular disease including coronary artery disease (CAD). However, better outcomes noted in obese patients undergoing percutaneous cardiovascular interventions for CAD, a phenomenon known as the obesity paradox. In this review, we performed extensive search for obesity paradox in obese patients undergoing percutaneous coronary intervention and discussed possible mechanism and disparities in different race and sex. PMID:29081905

  18. Georgia Tech Vertical Lift Research Center of Excellence

    DTIC Science & Technology

    2017-12-14

    Technical Project Summaries Task 1.1 (GT-1): Next Generation VABS for More Realistic Modeling of Composite Blades ...Methodology for the Prediction of Rotor Blade Ice Formation and Shedding ..................................................................... 20...software disclosures and technology transfer efforts. Task 1.1 (GT-1): Next Generation VABS for More Realistic Modeling of Composite Blades PIs

  19. Impact of the viral respiratory season on postoperative outcomes in children undergoing cardiac surgery.

    PubMed

    Spaeder, Michael C; Carson, Kathryn A; Vricella, Luca A; Alejo, Diane E; Holmes, Kathryn W

    2011-08-01

    To compare postoperative outcomes in children undergoing cardiac surgery during the viral respiratory season and nonviral season at our institution. This was a retrospective cohort study and secondary matched case-control analysis. The setting was an urban academic tertiary-care children's hospital. The study was comprised of all patients <18 years of age who underwent cardiac surgery at Johns Hopkins Hospital from October 2002 through September 2007. Patients were stratified by season of surgery, complexity of cardiac disease, and presence or absence of viral respiratory infection. Measurements included patient characteristics and postoperative outcomes. The primary outcome was postoperative length of stay (LOS). A total of 744 patients were included in the analysis. There was no difference in baseline characteristics or outcomes, specifically, no difference in postoperative LOS, intensive care unit (ICU) LOS, and mortality, among patients by seasons of surgery. Patients with viral respiratory illness were more likely to have longer postoperative LOS (p < 0.01) and ICU LOS (p < 0.01) compared with matched controls. We identified no difference in postoperative outcomes based on season in patients undergoing cardiac surgery. Children with viral respiratory infection have significantly worse outcomes than matched controls, strengthening the call for universal administration of influenza vaccination and palivizumab to appropriate groups. Preoperative testing for respiratory viruses should be considered during the winter months for children undergoing elective cardiac surgery.

  20. Donepezil for treatment of cognitive dysfunction in children with Down syndrome aged 10-17.

    PubMed

    Kishnani, Priya S; Heller, James H; Spiridigliozzi, Gail A; Lott, Ira; Escobar, Luis; Richardson, Sharon; Zhang, Richard; McRae, Thomas

    2010-12-01

    The objective of this 10-week, randomized, double-blind, placebo-controlled multicenter study was to assess the efficacy and safety of donepezil for the treatment of cognitive dysfunction exhibited by children with Down syndrome (DS). Intervention comprised donepezil (2.5-10 mg/day) in children (aged 10-17 years) with DS of mild-to-moderate severity. The primary measures were the Vineland-II Adaptive Behavior Scales (VABS-II) Parent/Caregiver Rating Form (PCRF) the sum of nine subdomain standardized scores and standard safety measures. Secondary measures included the VABS-II/PCRF scores on the following domains and their respective individual subdomains: Communication (receptive, expressive, and written); Daily Living Skills (personal, domestic, and community); Socialization (interpersonal relationships, play and leisure time, and coping skills), and scores on the Test of Verbal Expression and Reasoning, a subject-performance-based measure of expressive language. At baseline, 129 participants were assigned treatment with donepezil or placebo. During the double-blind phase, VABS II/PCRF sum of the nine subdomain standardized scores, called v-scores, improved significantly from baseline in both groups (P < 0.0001), with no significant between-group differences. This trial failed to demonstrate any benefit for donepezil versus placebo in children and adolescents with DS, although donepezil appeared to be well tolerated. © 2010 Wiley-Liss, Inc.

  1. Tensile testing apparatus

    NASA Technical Reports Server (NTRS)

    Blackburn, L. B.; Ellingsworth, J. R. (Inventor)

    1985-01-01

    An improved mechanical extensometer is described for use with a constant load creep test machine. The dead weight of the extensometer is counterbalanced by two pairs of weights connected through a pulley system and to rod extension and leading into the furnace where the test sample is undergoing elevated temperature (above 500 F.) tensile testing. Novel gripper surfaces, conical tip and flat surface are provided in each sampling engaging platens to reduce the grip pressure normally required for attachment of the extensometer to the specimen and reduce initial specimen bending normally associated with foil-gage metal testing.

  2. Status of selected nutrients in obese dogs undergoing caloric restriction.

    PubMed

    Linder, Deborah E; Freeman, Lisa M; Holden, Shelley L; Biourge, Vincent; German, Alexander J

    2013-10-24

    The purpose of this study was to test the hypothesis that dog plasma concentrations of selected nutrients decrease after undergoing caloric restriction for weight loss. Thirty-one overweight dogs that had successfully lost at least 15% of initial body weight were included in the study. Nutrients that had been previously identified to be at potential risk of deficiency during caloric restriction were measured in plasma (choline, amino acids) and urine (selenium) at the initiation and completion of a standardized weight loss regimen in dogs. Dogs remained healthy throughout the study, and no signs attributable to nutrient deficiency were noted. Percentage weight loss was 28.3% (16.0-40.1%) starting body weight, over a period of 250 days (91-674 days). Median energy intake during the weight loss period was 62 (44 to 74) Kcal/kg(0.75) target weight per day. Choline (P = 0.046) and threonine (P = 0.02) decreased after weight loss. Glycine (P = 0.041), and urinary selenium:creatinine ratio (P = 0.006) both increased after weight loss. There were no other significant differences in plasma nutrient concentrations. Since concentrations of most measured nutrients did not change significantly, the data are not consistent with widespread nutrient deficiency in dogs undergoing caloric restriction using a diet formulated for weight loss. However, the significance of the decrease in plasma choline concentration requires further assessment.

  3. Yamamoto New Scalp Acupuncture for postoperative pain management in cats undergoing ovariohysterectomy.

    PubMed

    Ribeiro, Matheus R; de Carvalho, Carolina B; Pereira, Ricardo H Z; Nicácio, Gabriel M; Brinholi, Rejane B; Cassu, Renata N

    2017-09-01

    To evaluate the analgesic efficacy of Yamamoto New Scalp Acupuncture (YNSA) as an adjuvant for postoperative pain management in cats. Prospective, randomized, blinded, clinical study. Twenty cats aged (mean ± standard deviation) 25 ± 9 months and weighing 2.7 ± 0.6 kg undergoing ovariohysterectomy. The cats were sedated with intramuscular (IM) ketamine (5 mg kg -1 ), midazolam (0.5 mg kg -1 ) and tramadol (2 mg kg -1 ). The cats were randomly distributed before induction of anesthesia into two groups of 10 cats each: group YNSA, in which bilateral basic D points were stimulated with a dry needle from 20 minutes prior to anesthetic induction to the end of the surgery; group Control, in which no acupuncture was applied. Postoperative analgesia was assessed at 1, 2, 4, 8, 12, 18 and 24 hours postextubation using an Interactive Visual Analog Scale and Universidade Estadual Paulista-Botucatu Multidimensional Composite Pain Scale (UNESP-Botucatu MCPS). Rescue analgesia was provided with IM tramadol (2 mg kg -1 ), and the pain scores were reassessed 30 minutes after rescue intervention. If the analgesia remained insufficient, meloxicam (0.2 mg kg -1 as a single dose) was administered IM. Data were analyzed using Student t-test, Fisher exact test, Mann-Whitney U test and Friedman test (p < 0.05). Significantly lower pain scores were observed in YNSA when compared with Control at 1-4 hours based on the UNESP-Botucatu MCPS scores. Although significant differences were not identified between groups requiring rescue analgesia, additional postoperative analgesia was administered to four of 10 cats in Control and no cats in YNSA. Perioperative YNSA resulted in decreased pain scores and a reduction in postoperative requirement for rescue analgesia in cats. This method should be considered a viable option as an adjuvant analgesic therapy for cats undergoing ovariohysterectomy. Copyright © 2017 Association of Veterinary Anaesthetists and American College of

  4. [Management of Patients on Antithrombotic Agents Undergoing Endoscopy].

    PubMed

    Kim, Joon Sung; Kim, Byung Wook

    2018-05-25

    Antithrombotic agents are used increasingly in Asia. The management of patients on antithrombotics undergoing elective or emergency endoscopy has become an increasing clinical challenge for gastroenterologists. Current practice guidelines have been developed by societies from western countries. On the other hand, these guidelines cannot meet the specific needs of the Asian Pacific region, raising the need for separate guidelines in Asia. This review compares the recommendations of previous guidelines with the most recently published Asian guidelines regarding the management of patients on antithrombotic agents undergoing elective and emergency endoscopy.

  5. Longitudinal Investigation of Adaptive Functioning following Conformal Irradiation for Pediatric Craniopharyngioma and Low-Grade Glioma

    PubMed Central

    Netson, Kelli L.; Conklin, Heather M.; Wu, Shengjie; Xiong, Xiaoping; Merchant, Thomas E.

    2013-01-01

    Purpose Children treated for brain tumors with conformal radiation therapy experience preserved cognitive outcomes. Early evidence suggests that adaptive functions or independent living skills may be spared. This longitudinal investigation prospectively examined intellectual and adaptive functioning during the first 5 years following irradiation for childhood craniopharyngioma and low-grade glioma (LGG). The effect of visual impairment on adaptive outcomes was investigated. Methods and Materials Children with craniopharyngioma (n=62) and LGG (n=77) were treated using conformal or intensity-modulated radiation therapy. The median age was 8.05 years (3.21 years –17.64 years) and 8.09 years (2.20 years–19.27 years), respectively. Serial cognitive evaluations including measures of intelligence quotient (IQ) and the Vineland Adaptive Behavior Scales (VABS) were conducted at pre-irradiation baseline, 6 months after treatment, and annually through 5 years. A total of 588 evaluations were completed during the follow-up period. Results Baseline assessment revealed no deficits in IQ and VABS indices for children with craniopharyngioma, with significant (p < .05) longitudinal decline in VABS Communication and Socialization indices. Clinical factors associated with more rapid decline included females and pre-irradiation chemotherapy (interferon). The only change in VABS Daily Living Skills correlated with IQ change (r = .34; p = .01) in children with craniopharyngioma. Children with LGG performed below population norms (p < .05) at baseline on VABS Communication, Daily Living Indices, and the Adaptive Behavior Composite, with significant (p < .05) longitudinal decline limited to VABS Communication. Older age at irradiation was a protective factor against longitudinal decline. Severe visual impairment did not independently correlate with poorer adaptive outcomes for either tumor group. Conclusions There was relative sparing of post-irradiation functional outcomes over time

  6. Longitudinal Investigation of Adaptive Functioning Following Conformal Irradiation for Pediatric Craniopharyngioma and Low-Grade Glioma

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Netson, Kelli L.; Conklin, Heather M.; Wu, Shengjie

    2013-04-01

    Purpose: Children treated for brain tumors with conformal radiation therapy experience preserved cognitive outcomes. Early evidence suggests that adaptive functions or independent-living skills may be spared. This longitudinal investigation prospectively examined intellectual and adaptive functioning during the first 5 years following irradiation for childhood craniopharyngioma and low-grade glioma (LGG). The effect of visual impairment on adaptive outcomes was investigated. Methods and Materials: Children with craniopharyngioma (n=62) and LGG (n=77) were treated using conformal or intensity modulated radiation therapy. The median age was 8.05 years (3.21-17.64 years) and 8.09 years (2.20-19.27 years), respectively. Serial cognitive evaluations including measures of intelligence quotientmore » (IQ) and the Vineland Adaptive Behavior Scales (VABS) were conducted at preirradiation baseline, 6 months after treatment, and annually through 5 years. Five hundred eighty-eight evaluations were completed during the follow-up period. Results: Baseline assessment revealed no deficits in IQ and VABS indices for children with craniopharyngioma, with significant (P<.05) longitudinal decline in VABS Communication and Socialization indices. Clinical factors associated with more rapid decline included females and preirradiation chemotherapy (interferon). The only change in VABS Daily Living Skills correlated with IQ change (r=0.34; P=.01) in children with craniopharyngioma. Children with LGG performed below population norms (P<.05) at baseline on VABS Communication, Daily Living Indices, and the Adaptive Behavior Composite, with significant (P<.05) longitudinal decline limited to VABS Communication. Older age at irradiation was a protective factor against longitudinal decline. Severe visual impairment did not independently correlate with poorer adaptive outcomes for either tumor group. Conclusions: There was relative sparing of postirradiation functional outcomes over time in

  7. Family-Centered Education and Its Clinical Outcomes in Patients Undergoing Hemodialysis Short Running

    PubMed Central

    Bahramnezhad, Fatemeh; Asgari, Parvaneh; Zolfaghari, Mitra; Farokhnezhad Afshar, Pouya

    2015-01-01

    Background: Poor adherence to treatment in patients undergoing hemodialysis leads to many complications, including death of the patient. Objectives: This study was aimed to investigate the effect of family-based training on common side-effects during dialysis. Patients and Methods: The present randomized controlled trial study was conducted on 60 patients undergoing hemodialysis at hospitals of Tehran University of Medical Sciences, Iran, from May 2012 to October 2012. Samples were randomly divided into two groups of patient-education (n = 30) and education of patient associated with an active member of the family (n = 30). Blood pressure, chest pain, nausea, vomiting, headaches and muscle cramps were followed with a check list and a questionnaire. The frequencies of the abovementioned complications at the mentioned intervals were recorded in three stages (before the intervention as well as two and four weeks after the intervention). Data analysis was performed using SPSS software, version 16, with chi-square test, Fisher’s exact test and independent t-test. Results: The mean ages of the patients in patient-centered and the family-oriented groups were 47.41 ± 10.31 and 48.16 ± 9.21, respectively. The result showed that some of the variables such as chest pain (P = 0.50, P = 0.01), nausea (P = 0.50, P = 0.01), headache (P = 0.81, P = 0.016), and blood pressure (P = 0.91, P = 0.016) were statistically significant before and four weeks after the intervention. Conclusions: According to the result of this study, the presence of families in a treatment plan could be essential to follow the treatment plan and subsequently reduced the complications of hemodialysis. PMID:26290749

  8. Intraperitoneal bupivacaine with or without incisional bupivacaine for postoperative analgesia in dogs undergoing ovariohysterectomy.

    PubMed

    Kalchofner Guerrero, Karin S; Campagna, Ivo; Bruhl-Day, Rodolfo; Hegamin-Younger, Cecilia; Guerrero, Tomas G

    2016-09-01

    Intraperitoneal (IP) bupivacaine provides postoperative analgesia in dogs undergoing ovariohysterectomy (OHE) alone or in combination with incisional (INC) bupivacaine. This study investigated whether the combination of INC and IP bupivacaine is superior to IP bupivacaine alone. Prospective, randomized, blinded clinical study. Thirty-nine privately owned dogs undergoing OHE, aged 25 ± 23 months and weighing 11.8 ± 5.7 kg. Dogs were premedicated with acepromazine (0.05 mg kg(-1) ) and morphine (0.5 mg kg(-1) ) intramuscularly (IM); anaesthesia was induced with propofol and maintained with isoflurane in oxygen. Carprofen (4 mg kg(-1) ) was administered subcutaneously (SC) after intubation. Bupivacaine (3 mg kg(-1) ) IP was administered before complete closure of the linea alba to all dogs. Dogs were randomly assigned into two groups: group B received bupivacaine (n = 20; 1 mg kg(-1) ) and group S received saline (n = 19; 0.2 mL kg(-1) ) INC as a subcutaneous 'splash' before skin closure. Postoperative analgesia was assessed with a dynamic interactive visual analogue scale, the short form of the Glasgow Composite Pain Scale, and mechanical nociceptive threshold (MNT) measurement at 0.5, 1, 2, 4, 6, 8, 12 and 20 hours after surgery by one blinded observer. Parametric data were tested using t-test; nonparametric data were analysed using the two-sample Wilcoxon test (p < 0.05). There was no significant difference between groups with regard to age, weight, surgical and anaesthetic duration, incision length, sedation and pain scores. MNT values decreased in both groups at all time points as compared with the baseline. No dog required rescue analgesia. No postoperative complications were observed. Bupivacaine IP and carprofen SC after morphine IM did provide satisfactory postoperative analgesia in dogs undergoing OHE with the anaesthetic protocol used. There appears to be no clinical advantage to adding bupivacaine INC. Neither protocol could

  9. delta(9)-Tetrahydrocannabinol-dependent mice undergoing withdrawal display impaired spatial memory.

    PubMed

    Wise, Laura E; Varvel, Stephen A; Selley, Dana E; Wiebelhaus, Jason M; Long, Kelly A; Middleton, Lisa S; Sim-Selley, Laura J; Lichtman, Aron H

    2011-10-01

    Cannabis users display a constellation of withdrawal symptoms upon drug discontinuation, including sleep disturbances, irritability, and possibly memory deficits. In cannabinoid-dependent rodents, the CB(1) antagonist rimonabant precipitates somatic withdrawal and enhances forskolin-stimulated adenylyl cyclase activity in cerebellum, an effect opposite that of acutely administered ∆(9)-tetrahydrocannabinol (THC), the primary constituent in cannabis. Here, we tested whether THC-dependent mice undergoing rimonabant-precipitated withdrawal display short-term spatial memory deficits, as assessed in the Morris water maze. We also evaluated whether rimonabant would precipitate adenylyl cyclase superactivation in hippocampal and cerebellar tissue from THC-dependent mice. Rimonabant significantly impaired spatial memory of THC-dependent mice at lower doses than those necessary to precipitate somatic withdrawal behavior. In contrast, maze performance was near perfect in the cued task, suggesting sensorimotor function and motivational factors were unperturbed by the withdrawal state. Finally, rimonabant increased adenylyl cyclase activity in cerebellar, but not in hippocampal, membranes. The memory disruptive effects of THC undergo tolerance following repeated dosing, while the withdrawal state leads to a rebound deficit in memory. These results establish spatial memory impairment as a particularly sensitive component of cannabinoid withdrawal, an effect that may be mediated through compensatory changes in the cerebellum.

  10. Acupuncture and pharmacopuncture are as effective as morphine or carprofen for postoperative analgesia in bitches undergoing ovariohysterectomy.

    PubMed

    Luna, Stelio Pacca Loureiro; Martino, Irene Di; Lorena, Silvia Elaine Rodolfo de Sá; Capua, Maria Luisa Buffo de; Lima, Alfredo Feio da Maia; Santos, Bianca Paiva Costa Rodrigues dos; Brondani, Juliana Tabarelli; Vesce, Giancarlo

    2015-12-01

    To investigate the analgesic effect of acupuncture (AP) or micro-dose pharmacopuncture (PA), using carprofen or morphine, in bitches undergoing ovariohysterectomy (OHE). Thirty five dogs were randomly assigned to five groups after sedation with acepromazine IM: AP, 0.5 mg.kg(-1) of morphine subcutaneously (SC), 4 mg.kg(-1) of carprofen SC, and PA with 0.05 mg.kg(-1) of morphine or 0.4 mg.kg(-1) of carprofen. Anaesthesia was induced with propofol and maintained with isoflurane. Pain was assessed after OHE by a blind observer for 24h, by dynamic visual analogue scale (DIVAS), Glasgow (CMPS-SF), Melbourne (UMPS) and Colorado University pain scale (CSU). Animals reaching 33% of the UMPS score received rescue analgesia with morphine IM. Non parametric data were analysed by Kruskal-Wallis or Friedman tests where applicable, followed by Dunn's test. Parametric data were analysed by two way ANOVA, followed by Tukey test. There were no differences among groups in number of rescue analgesia. Except for the DIVAS score where animals treated with morphine had the lowest score compared with AP and carprofen, at 1h after surgery, there were no other differences among groups. Acupuncture or pharmacopuncture were equally effective as morphine or carprofen to control postoperative pain in bitches undergoing ovariohysterectomy.

  11. Length-dependence of intramolecular electron transfer in σ-bonded rigid molecular rods: an ab initio molecular orbital study

    NASA Astrophysics Data System (ADS)

    Pati, Ranjit; Karna, Shashi P.

    2002-01-01

    The dependence of electron transfer (ET) coupling element, VAB, on the length of rigid-rod-like systems consisting of bicyclo[1.1.1]pentane (BCP), cubane (CUB), and bicyclo[2.2.2]octane (BCO) monomers, has been investigated with the use of ab initio Hartree-Fock (HF) method employing Marcus-Hush two-state (TS) model. The value of VAB decreases exponentially with increase in the number of the cage units of the σ-bonded molecules. The calculated decay constant, β, shows good agreement with previously reported data. For molecular length⩾15 Å, the value of VAB becomes negligibly small, suggesting complete suppression of the through bond direct tunneling contribution to ET process.

  12. KSC-06pd0820

    NASA Image and Video Library

    2006-05-12

    KENNEDY SPACE CENTER, FLA. - The orbiter Discovery, on top of an orbiter transporter, heads toward NASA's Vehicle Assembly Building (VAB) after leaving the Orbiter Processing Facility. The rollover to the VAB marks the start of the journey to the launch pad and, ultimately, launch. Once inside the VAB, Discovery will be raised to vertical and lifted up and over into high bay 3 for stacking with its redesigned external tank and twin solid rocket boosters. The rollout of Space Shuttle Discovery to Launch Pad 39B is expected in approximately a week. Launch of Discovery on mission STS-121 is scheduled to take place in a window extending July 1 to July 19. Photo credit: NASA/Jim Grossmann

  13. KSC-06pd0821

    NASA Image and Video Library

    2006-05-12

    KENNEDY SPACE CENTER, FLA. - The orbiter Discovery, on top of an orbiter transporter, rolls into NASA's Vehicle Assembly Building (VAB) after leaving the Orbiter Processing Facility. The rollover to the VAB marks the start of the journey to the launch pad and, ultimately, launch. Once inside the VAB, Discovery will be raised to vertical and lifted up and over into high bay 3 for stacking with its redesigned external tank and twin solid rocket boosters. The rollout of Space Shuttle Discovery to Launch Pad 39B is expected in approximately a week. Launch of Discovery on mission STS-121 is scheduled to take place in a window extending July 1 to July 19. Photo credit: NASA/Jim Grossmann

  14. Sandhill cranes browse for food near VAB

    NASA Technical Reports Server (NTRS)

    2000-01-01

    While the sandhill crane parents search for food in front of the Vehicle Assembly Building, their still-featherless baby nearby tests its voice. The cranes have been a constant sight in the Launch Complex 39 area during the month of May. Sandhill cranes range from Siberia, Alaska and Arctic islands to Michigan, Minnesota and California; from Florida to Texas. They prefer large freshwater marshes, prairie ponds and marshy tundra. KSC shares a boundary with the Merritt Island National Wildlife Refuge, which encompasses 92,000 acres that are a habitat for more than 331 species of birds, 31 mammals, 117 fishes, and 65 amphibians and reptiles. The marshes and open water of the refuge provide wintering areas for 23 species of migratory waterfowl, as well as a year-round home for great blue herons, great egrets, wood storks, cormorants, brown pelicans and other species of marsh and shore birds, as well as a variety of insects.

  15. Atlantis Non-destructive Testing

    NASA Image and Video Library

    2003-10-29

    In the Orbiter Processing Facility, the nose cap (foreground) removed from Atlantis (behind) waits to be shipped to the original manufacturing company, Vought in Ft. Worth, Texas, a subsidiary of Lockheed Martin, to undergo non-destructive testing such as CAT scan and thermography.

  16. Coping strategies used by hospitalized children with cancer undergoing chemotherapy.

    PubMed

    Sposito, Amanda Mota Pacciulio; Silva-Rodrigues, Fernanda Machado; Sparapani, Valéria de Cássia; Pfeifer, Luzia Iara; de Lima, Regina Aparecida Garcia; Nascimento, Lucila Castanheira

    2015-03-01

    To analyze coping strategies used by children with cancer undergoing chemotherapy during hospitalization. This was an exploratory study to analyze qualitative data using an inductive thematic analysis. Semistructured interviews using puppets were conducted with 10 children with cancer, between 7 and 12 years old, who were hospitalized and undergoing chemotherapy. The coping strategies to deal with chemotherapy were: understanding the need for chemotherapy; finding relief for the chemotherapy's side effects and pain; seeking pleasure in nourishment; engaging in entertaining activities and having fun; keeping the hope of cure alive; and finding support in religion. Children with cancer undergoing chemotherapy need to cope with hospitalizations, pain, medication side effects, idle time, and uncertainty regarding the success of treatment. These challenges motivated children to develop their own coping strategies, which were effective while undergoing chemotherapy. By gaining knowledge and further understanding about valid coping strategies during chemotherapy treatment, health professionals can mobilize personal and material resources from the children, health teams, and institutions aiming to potentiate the use of these strategies to make treatments the least traumatic. © 2015 Sigma Theta Tau International.

  17. Cardiothoracic ratio within the “normal” range independently predicts mortality in patients undergoing coronary angiography

    PubMed Central

    Zaman, M Justin S; Sanders, Julie; Crook, Angela M; Feder, Gene; Shipley, Martin; Timmis, Adam; Hemingway, Harry

    2007-01-01

    Objective To determine whether cardiothoracic ratio (CTR), within the range conventionally considered normal, predicted prognosis in patients undergoing coronary angiography. Design Cohort study with a median of 7‐years follow‐up. Setting Consecutive patients undergoing coronary angiography at Barts and The London National Health Service (NHS) Trust. Subjects 1005 patients with CTRs measured by chest radiography, and who subsequently underwent coronary angiography. Of these patients, 7.3% had a CTR ⩾0.5 and were excluded from the analyses. Outcomes All‐cause mortality and coronary event (non‐fatal myocardial infarction or coronary death). Adjustments were made for age, left ventricular dysfunction, ACE inhibitor treatment, body mass index, number of diseased coronary vessels and past coronary artery bypass graft. Results The risk of death was increased among patients with a CTR in the upper part of the normal range. In total, 94 (18.9%) of those with a CTR below the median of 0.42 died compared with 120 (27.8%) of those with a CTR between 0.42 and 0.49 (log rank test p<0.001). After adjusting for potential confounders, this increased risk remained (adjusted HR 1.45, 95% CI 1.03 to 2.05). CTR, at values below 0.5, was linearly related to the risk of coronary event (test for trend p = 0.024). Conclusion : In patients undergoing coronary angiography, CTR between 0.42 and 0.49 was associated with higher mortality than in patients with smaller hearts. There was evidence of a continuous increase in risk with higher CTR. These findings, along with those in healthy populations, question the conventional textbook cut‐off point of ⩾0.5 being an abnormal CTR. PMID:17164481

  18. KSC-2012-5893

    NASA Image and Video Library

    2012-10-19

    CAPE CANAVERAL, Fla. – An Orion mockup spacecraft atop its service module simulator is lowered onto a transporter in the transfer aisle of the Vehicle Assembly Building, or VAB, at NASA's Kennedy Space Center in Florida. The Orion mockup is exact in details on the outside, but mostly empty on the inside. The work in the VAB is crucial to making sure the designs are accurate. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on a Space Launch System rocket. For more information, visit http://www.nasa.gov/orion Photo credit: NASA/ Dmitri Gerondidakis

  19. KSC-2012-4319

    NASA Image and Video Library

    2012-08-06

    CAPE CANAVERAL, Fla. – The Orion mockup spacecraft sits atop its service module simulator in the transfer aisle of the Vehicle Assembly Building, or VAB, at NASA's Kennedy Space Center in Florida. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. The first uncrewed test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on a Space Launch System rocket. The Orion mockup is exact in details on the outside, but mostly empty on the inside except for four mockup astronaut seats and hatch. The work in the VAB is crucial to making sure the designs are accurate. For more information, visit http://www.nasa.gov/orion Photo credit: NASA/ Dmitri Gerondidakis

  20. KSC-2012-4316

    NASA Image and Video Library

    2012-08-06

    CAPE CANAVERAL, Fla. – The Orion mockup spacecraft sits atop its service module simulator in the transfer aisle of the Vehicle Assembly Building, or VAB, at NASA's Kennedy Space Center in Florida. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. The first uncrewed test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on a Space Launch System rocket. The Orion mockup is exact in details on the outside, but mostly empty on the inside except for four mockup astronaut seats and hatch. The work in the VAB is crucial to making sure the designs are accurate. For more information, visit http://www.nasa.gov/orion Photo credit: NASA/ Dmitri Gerondidakis

  1. Prostate Cancer Screening: Should You Get a PSA Test?

    MedlinePlus

    ... Mayo Clinic Staff Cancer screening tests — including the prostate-specific antigen (PSA) test to look for signs of prostate ... of harm to the person undergoing the testing. Prostate-specific antigen (PSA) is a protein produced by both cancerous ( ...

  2. LAUNCH VEHICLE STAGE ADAPTER MOVE TO TEST FACILITY

    NASA Image and Video Library

    2016-10-12

    A SLS LAUNCH VEHICLE STAGE ADAPTER IS MOVED FROM THE VERTICAL WELD TOOL STATION IN MSFC’S BUILDING 4755 TO THE WEST TEST AREA’S TEST STAND 4699 WHERE IT WILL UNDERGO FURTHER TESTING OF ITS ABILITY TO WITHSTAND THE STRESSES RELATED TO LAUNCH AND SPACE TRAVEL.

  3. Conserved gene regulatory module specifies lateral neural borders across bilaterians.

    PubMed

    Li, Yongbin; Zhao, Di; Horie, Takeo; Chen, Geng; Bao, Hongcun; Chen, Siyu; Liu, Weihong; Horie, Ryoko; Liang, Tao; Dong, Biyu; Feng, Qianqian; Tao, Qinghua; Liu, Xiao

    2017-08-01

    The lateral neural plate border (NPB), the neural part of the vertebrate neural border, is composed of central nervous system (CNS) progenitors and peripheral nervous system (PNS) progenitors. In invertebrates, PNS progenitors are also juxtaposed to the lateral boundary of the CNS. Whether there are conserved molecular mechanisms determining vertebrate and invertebrate lateral neural borders remains unclear. Using single-cell-resolution gene-expression profiling and genetic analysis, we present evidence that orthologs of the NPB specification module specify the invertebrate lateral neural border, which is composed of CNS and PNS progenitors. First, like in vertebrates, the conserved neuroectoderm lateral border specifier Msx/vab-15 specifies lateral neuroblasts in Caenorhabditis elegans Second, orthologs of the vertebrate NPB specification module ( Msx/vab-15 , Pax3/7/pax-3 , and Zic/ref-2 ) are significantly enriched in worm lateral neuroblasts. In addition, like in other bilaterians, the expression domain of Msx/vab-15 is more lateral than those of Pax3/7/pax-3 and Zic/ref- 2 in C. elegans Third, we show that Msx/vab-15 regulates the development of mechanosensory neurons derived from lateral neural progenitors in multiple invertebrate species, including C. elegans , Drosophila melanogaster , and Ciona intestinalis We also identify a novel lateral neural border specifier, ZNF703/tlp-1 , which functions synergistically with Msx/vab- 15 in both C. elegans and Xenopus laevis These data suggest a common origin of the molecular mechanism specifying lateral neural borders across bilaterians.

  4. Conserved gene regulatory module specifies lateral neural borders across bilaterians

    PubMed Central

    Li, Yongbin; Zhao, Di; Horie, Takeo; Chen, Geng; Bao, Hongcun; Chen, Siyu; Liu, Weihong; Horie, Ryoko; Liang, Tao; Dong, Biyu; Feng, Qianqian; Tao, Qinghua

    2017-01-01

    The lateral neural plate border (NPB), the neural part of the vertebrate neural border, is composed of central nervous system (CNS) progenitors and peripheral nervous system (PNS) progenitors. In invertebrates, PNS progenitors are also juxtaposed to the lateral boundary of the CNS. Whether there are conserved molecular mechanisms determining vertebrate and invertebrate lateral neural borders remains unclear. Using single-cell-resolution gene-expression profiling and genetic analysis, we present evidence that orthologs of the NPB specification module specify the invertebrate lateral neural border, which is composed of CNS and PNS progenitors. First, like in vertebrates, the conserved neuroectoderm lateral border specifier Msx/vab-15 specifies lateral neuroblasts in Caenorhabditis elegans. Second, orthologs of the vertebrate NPB specification module (Msx/vab-15, Pax3/7/pax-3, and Zic/ref-2) are significantly enriched in worm lateral neuroblasts. In addition, like in other bilaterians, the expression domain of Msx/vab-15 is more lateral than those of Pax3/7/pax-3 and Zic/ref-2 in C. elegans. Third, we show that Msx/vab-15 regulates the development of mechanosensory neurons derived from lateral neural progenitors in multiple invertebrate species, including C. elegans, Drosophila melanogaster, and Ciona intestinalis. We also identify a novel lateral neural border specifier, ZNF703/tlp-1, which functions synergistically with Msx/vab-15 in both C. elegans and Xenopus laevis. These data suggest a common origin of the molecular mechanism specifying lateral neural borders across bilaterians. PMID:28716930

  5. A nonaffine network model for elastomers undergoing finite deformations

    NASA Astrophysics Data System (ADS)

    Davidson, Jacob D.; Goulbourne, N. C.

    2013-08-01

    In this work, we construct a new physics-based model of rubber elasticity to capture the strain softening, strain hardening, and deformation-state dependent response of rubber materials undergoing finite deformations. This model is unique in its ability to capture large-stretch mechanical behavior with parameters that are connected to the polymer chemistry and can also be easily identified with the important characteristics of the macroscopic stress-stretch response. The microscopic picture consists of two components: a crosslinked network of Langevin chains and an entangled network with chains confined to a nonaffine tube. These represent, respectively, changes in entropy due to thermally averaged chain conformations and changes in entropy due to the magnitude of these conformational fluctuations. A simple analytical form for the strain energy density is obtained using Rubinstein and Panyukov's single-chain description of network behavior. The model only depends on three parameters that together define the initial modulus, extent of strain softening, and the onset of strain hardening. Fits to large stretch data for natural rubber, silicone rubber, VHB 4905 (polyacrylate rubber), and b186 rubber (a carbon black-filled rubber) are presented, and a comparison is made with other similar constitutive models of large-stretch rubber elasticity. We demonstrate that the proposed model provides a complete description of elastomers undergoing large deformations for different applied loading configurations. Moreover, since the strain energy is obtained using a clear set of physical assumptions, this model may be tested and used to interpret the results of computer simulation and experiments on polymers of known microscopic structure.

  6. Voyager Proof Test Model

    NASA Image and Video Library

    1977-01-12

    This archival photo shows the Voyager Proof Test Model undergoing a mechanical preparation and weight center of gravity test at NASA's Jet Propulsion Laboratory, Pasadena, California, on January 12, 1977. The stack of three white cylinders seen near center is a stand-in for the spacecraft's power generators (called RTGs). Above that, a silvery canister holds the spacecraft's magnetometer in its stowed configuration. https://photojournal.jpl.nasa.gov/catalog/PIA21477

  7. Prevalence and predictors of renal artery stenosis in patients undergoing peripheral and coronary angiography.

    PubMed

    Shukla, Anand N; Madan, Tarun H; Jayaram, Ashwal A; Kute, Vivek B; Rawal, Jayesh R; Manjunath, A P; Udhreja, Satyam

    2013-12-01

    Renal artery stenosis is a potential cause of secondary hypertension, ischemic nephropathy and end-stage renal disease. Atherosclerosis is by far the most common etiology of renal artery stenosis in elderly. We investigated whether the presence of significant atherosclerotic renal artery stenosis (ARAS) with luminal diameter narrowing ≥50 % could be predicted in patients undergoing peripheral and coronary angiography. The records of 3,500 consecutive patients undergoing simultaneous renal angiography along with peripheral and coronary angiography were reviewed. The patients with known renal artery disease were excluded. Prevalence of ARAS was 5.7 %. Significant ARAS (luminal diameter narrowing ≥50 %) was present in 139 patients (3.9 %). Hypertension with altered serum creatinine and triple-vessel CAD were associated with significant renal artery stenosis in multivariate analysis. No significant relationship between the involved coronary arteries like left anterior descending, left circumflex, right coronary artery and ARAS was found. Only hypertension and altered serum creatinine were associated with bilateral ARAS. Extent of CAD or risk factors like diabetes, hyperlipidemia or smoking did not predict the unilateral or bilateral ARAS. Prevalence of ARAS among the patients in routine cardiac catheterization was 5.7 %. Hypertension is closely associated with significant ARAS. Significant CAD in the form of triple-vessel disease and altered renal function tests are closely associated with ARAS. They predict the presence of significant renal artery stenosis in patients undergoing routine peripheral and coronary angiography. Moreover, hypertension and altered renal functions predict bilateral ARAS.

  8. KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis is backed out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis is backed out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  9. KENNEDY SPACE CENTER, FLA. -- Endeavour is towed toward the Vehicle Assembly Building for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- Endeavour is towed toward the Vehicle Assembly Building for temporary storage. The orbiter has been moved from the Orbiter Processing Facility (OPF) to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  10. KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis is back inside the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis is back inside the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  11. KENNEDY SPACE CENTER, FLA. -- The orbiter Atlantis is backed away from the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. -- The orbiter Atlantis is backed away from the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  12. KENNEDY SPACE CENTER, FLA. -- The orbiter Atlantis is backed out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. -- The orbiter Atlantis is backed out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  13. KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis rolls out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis rolls out of the Vehicle Assembly Building for transfer back to the Orbiter Processing Facility. Atlantis spent 10 days in the VAB to allow work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  14. KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis is towed back to the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. - The orbiter Atlantis is towed back to the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  15. Status of selected nutrients in obese dogs undergoing caloric restriction

    PubMed Central

    2013-01-01

    Background The purpose of this study was to test the hypothesis that dog plasma concentrations of selected nutrients decrease after undergoing caloric restriction for weight loss. Thirty-one overweight dogs that had successfully lost at least 15% of initial body weight were included in the study. Nutrients that had been previously identified to be at potential risk of deficiency during caloric restriction were measured in plasma (choline, amino acids) and urine (selenium) at the initiation and completion of a standardized weight loss regimen in dogs. Results Dogs remained healthy throughout the study, and no signs attributable to nutrient deficiency were noted. Percentage weight loss was 28.3% (16.0-40.1%) starting body weight, over a period of 250 days (91–674 days). Median energy intake during the weight loss period was 62 (44 to 74) Kcal/kg0.75 target weight per day. Choline (P = 0.046) and threonine (P = 0.02) decreased after weight loss. Glycine (P = 0.041), and urinary selenium:creatinine ratio (P = 0.006) both increased after weight loss. There were no other significant differences in plasma nutrient concentrations. Conclusions Since concentrations of most measured nutrients did not change significantly, the data are not consistent with widespread nutrient deficiency in dogs undergoing caloric restriction using a diet formulated for weight loss. However, the significance of the decrease in plasma choline concentration requires further assessment. PMID:24156605

  16. Cognitive function and adherence of older adults undergoing hemodialysis.

    PubMed

    Hain, Debra J

    2008-01-01

    As the number of older adults undergoing hemodialysis increases, it is important for nurses to consider cognitive impairment as a contributing factor to non-adherence. The purpose of this exploratory study was to identify cognitive markers that nurses can use to alert them to potential problems with adherence among older adults undergoing hemodialysis. Stories of the health challenge of making lifestyle change were analyzed with a linguistic analysis software program. A standardized instrument (3MS) that measures global cognitive function was administered. Determination of adherence level was the last activity of data collection. In this sample (n=63), 39.7% of the participants had evidence of cognitive impairment (3MS score less than 80); 58.2% of the 39.7% had evidence of non-adherence. There was a significant relationship between word use and cognitive function (p < .01). Cognitive impairment is prevalent among older adults undergoing hemodialysis and words might be a proxy for recognizing this.

  17. Audiometric Testing Guideline Adherence in Children Undergoing Tympanostomy Tubes: A Population-Based Study.

    PubMed

    Beyea, Jason A; Rosen, Emily; Stephens, Trina; Nguyen, Paul; Hall, Stephen F

    2018-02-01

    Objective Tympanostomy tube (TT) insertion is the most common ambulatory surgery performed on children. American Academy of Otolaryngology-Head and Neck Surgery Founda-tion (AAO-HNSF) Clinical Practice Guidelines (CPGs) recommend hearing testing for all pediatric TT candidates. The aim of this study was to assess audiometric testing in this population. Study Design Retrospective population-based cohort study. Setting All hospitals in the Canadian province of Ontario. Subjects and Methods All patients 12 years of age and younger who underwent at least 1 TT procedure between January 1993 and June 2016. The primary outcomes were the percentage of patients who underwent a hearing test within 1 year before and/or 1 year after surgery. Results A total of 316,599 bilateral TT procedures were performed during the study period (1993 to 2016). Presurgical hearing tests increased from 55.7% to 74.9%, and postsurgical hearing tests increased from 42.2% to 68.9%. Younger surgeons demonstrated a greater adherence to the CPGs (relative risk [RR], 1.22; 95% CI, 1.08-1.38; P = .001). Remarkably, there was not a spike in preoperative hearing tests following the introduction of the CPGs in 2013 (RR, 1.12; 95% CI, 0.85-1.47; P = .432). Presurgical hearing testing ranged from 26.1% to 83.5% across health regions. Conclusion In this cohort of children who underwent TT placement, the trends of preoperative and postoperative audiometric testing are increasing but are still lower than recommended by the CPGs, despite a tripling of practicing audiologists. This study describes the current state of testing in Ontario and highlights issues of access to audiology services, possible parent preferences, and the importance of ongoing continuing medical education for all health care practitioners.

  18. Nursing care of the patient undergoing coronary artery bypass grafting.

    PubMed

    Martin, Caron G; Turkelson, Sandra L

    2006-01-01

    The role of the professional nurse in the perioperative care of the patient undergoing open heart surgery is beneficial for obtaining a positive outcome for the patient. This article focuses on the preoperative and postoperative nursing care of patients undergoing coronary artery bypass graft surgery. Risk assessment, preoperative preparation, current operative techniques, application of the nursing process immediately after surgery, and common postoperative complications will be explored.

  19. Cassini's RTGs undergo mechanical and electrical verification tests in the PHSF

    NASA Technical Reports Server (NTRS)

    1997-01-01

    This radioisotope thermoelectric generator (RTG), at center, is ready for electrical verification testing now that it has been installed on the Cassini spacecraft in the Payload Hazardous Servicing Facility. A handling fixture, at far left, remains attached. This is the third and final RTG to be installed on Cassini for the prelaunch tests. The RTGs will provide electrical power to Cassini on its 6.7-year trip to the Saturnian system and during its four-year mission at Saturn. RTGs use heat from the natural decay of plutonium to generate electric power. The generators enable spacecraft to operate at great distances from the Sun where solar power systems are not feasible. The Cassini mission is targeted for an Oct. 6 launch aboard a Titan IVB/Centaur expendable launch vehicle.

  20. [Professional or household performance of patients with breast cancer undergoing chemotherapy].

    PubMed

    Martins, Lourdes Conceição; Ferreira Filho, Celso; Del Giglio, Auro; Munhoes, Daniela Armonia; Trevizan, Lígia Lopes Balsalobre; Herbst, Lívia Grigoriitchuk; Viera, Mariana da Cunha; Taranto, Patrícia; Pachon, Susy Cunha

    2009-01-01

    Evaluate patients with breast cancer undergoing chemotherapy with respect to their epidemiologic and clinical variables as well as performance at work or at home. this was a cross-sectional study including 52 women interviewed during breast cancer chemotherapy, stratified in two groups: those who continued to work and do household tasks, and did not continue to work or do household tasks. Patients were from two public hospitals in the State of São Paulo, one in Santo Andre and the other in São Bernardo do Campo. The WPAI - GH (Work Productivity and Activity Impairment) questionnaire was used to evaluate work and household performance of professionals or housewives, respectively. Mean age of the patients was 55.7 (SD=13.8), most were Caucasian (88.5%), married (55.8%), employed (65.3%) and the majority had to stop working because of treatment (51.0%), at more advanced stage (p<0.05), fatigue and nausea (p<0.05). Mean WPAI - GH was 67.04 (|SD = 5.62) for patients who stopped working and 49.17 (SD = 6.89) for those who continued to work (Mann-Whitney U test: p = 0.04). Chemotherapy leads to a decrease in performance of a sizable fraction of women with breast cancer undergoing chemotherapy. A more advanced stage of neoplasia was positively associated with withdrawal from these activities probably due to side effects such as fatigue and nausea.

  1. The effect of music listening on older adults undergoing cardiovascular surgery.

    PubMed

    Twiss, Elizabeth; Seaver, Jean; McCaffrey, Ruth

    2006-01-01

    The purpose of this study was to determine the effect of music listening on postoperative anxiety and intubation time in patients undergoing cardiovascular surgery. Coronary artery disease and valvular heart disease affect approximately 15 million Americans and 5 million persons in the U.K. annually, with the majority of these patients being older adults. The anxiety experienced before, during and after surgery increases cardiovascular workload, thereby prolonging recovery time. Music listening as a nursing intervention has shown an ability to reduce anxiety. The study used a randomized control trial design. Sixty adults older than 65 years were randomly assigned to the control and the experimental groups. The experimental group listened to music during and after surgery, while the control group received standard postoperative care. The Spielberger State Trait Anxiety Inventory was administered to both groups before surgery and 3 days postoperatively. The mean of the differences between scores was compared using analysis of variance. Differences in mean intubation time were measured in both groups. Older adults who listened to music had lower scores on the state anxiety test (F = 5.57, p = .022) and had significantly fewer minutes of postoperative intubation (F = 5.45, p = .031) after cardiovascular surgery. Older adults undergoing cardiovascular surgery who listen to music had less anxiety and reduced intubation time than those who did not.

  2. Pegasus Rocket Wing and PHYSX Glove Undergoes Stress Loads Testing

    NASA Technical Reports Server (NTRS)

    1997-01-01

    The Pegasus Hypersonic Experiment (PHYSX) Project's Pegasus rocket wing with attached PHYSX glove rests after load-tests at Scaled Composites, Inc., in Mojave, California, in January 1997. Technicians slowly filled water bags beneath the wing, to create the pressure, or 'wing-loading,' required to determine whether the wing could withstand its design limit for stress. The wing sits in a wooden triangular frame which serves as the test-rig, mounted to the floor atop the waterbags. Pegasus is an air-launched space booster produced by Orbital Sciences Corporation and Hercules Aerospace Company (initially; later, Alliant Tech Systems) to provide small satellite users with a cost-effective, flexible, and reliable method for placing payloads into low earth orbit. Pegasus has been used to launch a number of satellites and the PHYSX experiment. That experiment consisted of a smooth glove installed on the first-stage delta wing of the Pegasus. The glove was used to gather data at speeds of up to Mach 8 and at altitudes approaching 200,000 feet. The flight took place on October 22, 1998. The PHYSX experiment focused on determining where boundary-layer transition occurs on the glove and on identifying the flow mechanism causing transition over the glove. Data from this flight-research effort included temperature, heat transfer, pressure measurements, airflow, and trajectory reconstruction. Hypersonic flight-research programs are an approach to validate design methods for hypersonic vehicles (those that fly more than five times the speed of sound, or Mach 5). Dryden Flight Research Center, Edwards, California, provided overall management of the glove experiment, glove design, and buildup. Dryden also was responsible for conducting the flight tests. Langley Research Center, Hampton, Virginia, was responsible for the design of the aerodynamic glove as well as development of sensor and instrumentation systems for the glove. Other participating NASA centers included Ames Research

  3. RNase alleviates neurological dysfunction in mice undergoing cardiac arrest and cardiopulmonary resuscitation

    PubMed Central

    Ma, Ye; Chen, Chan; Zhang, Shu; Wang, Qiao; Chen, Hai; Dong, Yuanlin; Zhang, Zheng; Li, Yan; Niu, Zhendong; Zhu, Tao; Yu, Hai; Liu, Bin

    2017-01-01

    Cardiac arrest (CA) is one of the leading lethal factors. Despite cardiopulmonary resuscitation (CPR) procedure has been consecutively improved and lots of new strategies have been developed, neurological outcome of the patients experienced CPR is still disappointing. Ribonuclease (RNase) has been demonstrated to have neuroprotective effects in acute stroke and postoperative cognitive impairment, possibly through acting against endogenous RNA that released from damaged tissue. However, the role of RNase in post-cardiac arrest cerebral injury is unknown. In the present study, we investigated the role of RNase in neurological outcome of mice undergoing 5 minutes of CA and followed by CPR. RNase or the same dosage of normal saline was administrated. We found that RNase administration could: 1) improve neurologic score on day 1 and day 3 after CA/CPR performance; 2) improve memory and learning ability on day 3 after training in contextual fear-conditioning test; 3) reduce extracellular RNA (exRNA) level in plasma and hippocampus tissue, and hippocampal cytokines mRNA production on day 3 after CA/CPR procedure; 4) attenuate autophagy levels in hippocampus tissue on day 3 after CA/CPR procedure. In conclusion, RNase could improve neurological function by reducing inflammation response and autophagy in mice undergoing CA/CPR. PMID:28881795

  4. Statistical Enrichment of Epigenetic States Around Triplet Repeats that Can Undergo Expansions

    PubMed Central

    Essebier, Alexandra; Vera Wolf, Patricia; Cao, Minh Duc; Carroll, Bernard J.; Balasubramanian, Sureshkumar; Bodén, Mikael

    2016-01-01

    More than 30 human genetic diseases are linked to tri-nucleotide repeat expansions. There is no known mechanism that explains repeat expansions in full, but changes in the epigenetic state of the associated locus has been implicated in the disease pathology for a growing number of examples. A comprehensive comparative analysis of the genomic features associated with diverse repeat expansions has been lacking. Here, in an effort to decipher the propensity of repeats to undergo expansion and result in a disease state, we determine the genomic coordinates of tri-nucleotide repeat tracts at base pair resolution and computationally establish epigenetic profiles around them. Using three complementary statistical tests, we reveal that several epigenetic states are enriched around repeats that are associated with disease, even in cells that do not harbor expansion, relative to a carefully stratified background. Analysis of over one hundred cell types reveals that epigenetic states generally tend to vary widely between genic regions and cell types. However, there is qualified consistency in the epigenetic signatures of repeats associated with disease suggesting that changes to the chromatin and the DNA around an expanding repeat locus are likely to be similar. These epigenetic signatures may be exploited further to develop models that could explain the propensity of repeats to undergo expansions. PMID:27013954

  5. Hypovitaminosis D in patients undergoing kidney transplant: the importance of sunlight exposure.

    PubMed

    Vilarta, Cristiane F; Unger, Marianna D; Dos Reis, Luciene M; Dominguez, Wagner V; David-Neto, Elias; Moysés, Rosa M; Titan, Silvia; Custodio, Melani R; Hernandez, Mariel J; Jorgetti, Vanda

    2017-07-01

    Recent studies have shown a high prevalence of hypovitaminosis D, defined as a serum 25-hydroxyvitamin D level less than 30 ng/ml, in both healthy populations and patients with chronic kidney disease. Patients undergoing kidney transplant are at an increased risk of skin cancer and are advised to avoid sunlight exposure. Therefore, these patients might share two major risk factors for hypovitaminosis D: chronic kidney disease and low sunlight exposure. This paper describes the prevalence and clinical characteristics of hypovitaminosis D among patients undergoing kidney transplant. We evaluated 25-hydroxyvitamin D serum levels in a representative sample of patients undergoing kidney transplant. We sought to determine the prevalence of hypovitaminosis D, compare these patients with a control group, and identify factors associated with hypovitaminosis D (e.g., sunlight exposure and dietary habits). Hypovitaminosis D was found in 79% of patients undergoing kidney transplant, and the major associated factor was low sunlight exposure. These patients had higher creatinine and intact parathyroid hormone serum levels, with 25-hydroxyvitamin D being inversely correlated with intact parathyroid hormone serum levels. Compared with the control group, patients undergoing kidney transplant presented a higher prevalence of 25-hydroxyvitamin D deficiency and lower serum calcium, phosphate and albumin but higher creatinine and intact parathyroid hormone levels. Our results confirmed the high prevalence of hypovitaminosis D in patients undergoing kidney transplant. Therapeutic strategies such as moderate sunlight exposure and vitamin D supplementation should be seriously considered for this population.

  6. A 5-Year Investigation of Children's Adaptive Functioning Following Conformal Radiation Therapy for Localized Ependymoma

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Netson, Kelli L.; Conklin, Heather M.; Wu Shengjie

    2012-09-01

    Purpose: Conformal and intensity modulated radiation therapies have the potential to preserve cognitive outcomes in children with ependymoma; however, functional behavior remains uninvestigated. This longitudinal investigation prospectively examined intelligence quotient (IQ) and adaptive functioning during the first 5 years after irradiation in children diagnosed with ependymoma. Methods and Materials: The study cohort consisted of 123 children with intracranial ependymoma. Mean age at irradiation was 4.60 years (95% confidence interval [CI], 3.85-5.35). Serial neurocognitive evaluations, including an age-appropriate IQ measure and the Vineland Adaptive Behavior Scales (VABS), were completed before irradiation, 6 months after treatment, and annually for 5 years. Amore » total of 579 neurocognitive evaluations were included in these analyses. Results: Baseline IQ and VABS were below normative means (P<.05), although within the average range. Linear mixed models revealed stable IQ and VABS across the follow-up period, except for the VABS Communication Index, which declined significantly (P=.015). Annual change in IQ (-.04 points) did not correlate with annual change in VABS (-.90 to +.44 points). Clinical factors associated with poorer baseline performance (P<.05) included preirradiation chemotherapy, cerebrospinal fluid shunt placement, number and extent of surgical resections, and younger age at treatment. No clinical factors significantly affected the rate of change in scores. Conclusions: Conformal and intensity modulated radiation therapies provided relative sparing of functional outcomes including IQ and adaptive behaviors, even in very young children. Communication skills remained vulnerable and should be the target of preventive and rehabilitative interventions.« less

  7. KSC-2012-5892

    NASA Image and Video Library

    2012-10-19

    CAPE CANAVERAL, Fla. – An Orion mockup spacecraft atop its service module simulator is lifted in the transfer aisle of the Vehicle Assembly Building, or VAB, at NASA's Kennedy Space Center in Florida. The Orion mockup is exact in details on the outside, but mostly empty on the inside. The work in the VAB is crucial to making sure the designs are accurate. Visible in the background on the left is the space shuttle Atlantis being readied for its move to the Kennedy Space Center Visitor Complex. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. The first unpiloted test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on a Space Launch System rocket. For more information, visit http://www.nasa.gov/orion Photo credit: NASA/ Dmitri Gerondidakis

  8. KSC-2012-4320

    NASA Image and Video Library

    2012-08-06

    CAPE CANAVERAL, Fla. – The Orion mockup spacecraft sits atop its service module simulator in the transfer aisle of the Vehicle Assembly Building, or VAB, at NASA's Kennedy Space Center in Florida. To the left is the aerodynamic shell that will cover the capsule during launch. Orion is the exploration spacecraft designed to carry crews to space beyond low Earth orbit. It will provide emergency abort capability, sustain the crew during the space travel and provide safe re-entry from deep space return velocities. The first uncrewed test flight of the Orion is scheduled to launch in 2014 atop a Delta IV rocket and in 2017 on a Space Launch System rocket. The Orion mockup is exact in details on the outside, but mostly empty on the inside except for four mockup astronaut seats and hatch. The work in the VAB is crucial to making sure the designs are accurate. For more information, visit http://www.nasa.gov/orion Photo credit: NASA/ Dmitri Gerondidakis

  9. Breast cancer genetic testing: more than a medical management tool.

    PubMed

    Schroeder, Dawn; Conroy, Sherrill A

    2015-10-01

    Knowing whether a harmful hereditary mutation exists in BRCA1 and BRCA2 can enable women to make informed decisions regarding surveillance and surgery options to manage risk. Given the attention in the media about BRCA genetic testing, nurses need to revisit how this knowledge may affect a woman's sense of self and the forces that may influence this decision. This article aims to understand how complex the decision to undergo genetic testing may be for some women by exploring the impact of genetic knowledge on the self, changes to customary definitions for health and illness, and ethical issues and social forces that may influence genetic testing decisions. A review of the literature was undertaken to understand how genetic knowledge may alter meanings attached to the breast and how health is defined, and to identify ethical concerns and social forces that may affect a woman's decision to undergo or decline an offer for genetic testing. An understanding and awareness of the potential benefits and harms of BRCA1 and BRCA2 genetic testing, as well as the social forces that may influence a woman's decision to undergo or decline an offer for genetic testing and the commitment to remain open to the uniqueness of each woman's situation, may enhance the nurse-patient relationship and result in a decision that is ethically in the best interest of the patient.

  10. General Anaesthesia Protocols for Patients Undergoing Electroconvulsive Therapy

    PubMed Central

    Narayanan, Aravind; Lal, Chandar; Al-Sinawi, Hamed

    2017-01-01

    Objectives This study aimed to review general anaesthesia protocols for patients undergoing electroconvulsive therapy (ECT) at a tertiary care hospital in Oman, particularly with regards to clinical profile, potential drug interactions and patient outcomes. Methods This retrospective study took place at the Sultan Qaboos University Hospital (SQUH), Muscat, Oman. The electronic medical records of patients undergoing ECT at SQUH between January 2010 and December 2014 were reviewed for demographic characteristics and therapy details. Results A total of 504 modified ECT sessions were performed on 57 patients during the study period. All of the patients underwent a uniform general anaesthetic regimen consisting of propofol and succinylcholine; however, they received different doses between sessions, as determined by the treating anaesthesiologist. Variations in drug doses between sessions in the same patient could not be attributed to any particular factor. Self-limiting tachycardia and hypertension were periprocedural complications noted among all patients. One patient developed aspiration pneumonitis (1.8%). Conclusion All patients undergoing ECT received a general anaesthetic regimen including propofol and succinylcholine. However, the interplay of anaesthetic drugs with ECT efficacy could not be established due to a lack of comprehensive data, particularly with respect to seizure duration. In addition, the impact of concurrent antipsychotic therapy on anaesthetic dose and subsequent complications could not be determined. PMID:28417028

  11. Attitudes of Patients With Cancer About Personalized Medicine and Somatic Genetic Testing

    PubMed Central

    Gray, Stacy W.; Hicks-Courant, Katherine; Lathan, Christopher S.; Garraway, Levi; Park, Elyse R.; Weeks, Jane C.

    2012-01-01

    Purpose: Dramatic advances in genomic technology stand to revolutionize cancer care; however, little is known about patients' understanding and acceptance of personalized medicine and widespread genetic testing (GT). Patients and Methods: We conducted a formative, semi-structured interview study with a random sample of patients with lung, colorectal, and breast cancers to assess awareness of personalized medicine and GT and attitudes about somatic GT. Willingness to undergo GT was elicited through hypothetic scenarios. Results: Sixty-nine patients participated; 71% were women; 42% were black; median age was 59 years; and 42% had an education level ≥ college. We found that a majority of patients either were not aware of the term “personalized medicine” or defined it in unexpected ways. Although many patients identified relevant benefits of somatic testing (eg, informs treatment), many patients also expressed significant concerns (ie, psychological harm and discrimination). A majority of patients expressed a willingness to undergo somatic (predictive, 96%, prognostic, 93%) and germline (cancer risk without incidental information, 87%; cancer risk with incidental information, 81%; pharmacogenetic, 91%) testing; however, far fewer patients expressed a willingness to undergo full genome sequencing (62%). Reluctance was attributed to concerns over incidental findings, information overload, and the lack of a clear benefit. Conclusion: Many patients relayed misunderstandings about somatic testing and a reluctance to undergo full sequencing; oncologists must carefully consider how they present testing to patients so that concerns over discrimination and psychological harm do not hinder test uptake. More work is needed to identify effective ways to communicate complex genomic concepts to patients and research participants. PMID:23598841

  12. KENNEDY SPACE CENTER, FLA. - Crawler-transporter (CT) number 2, moves away from the Vehicle Assembly Building with a Mobile Launcher Platform (MLP) on top on a test run to the launch pad. The CT recently underwent modifications to the cab. The CT moves Space Shuttle vehicles, situated on the MLP, between the VAB and launch pad. Moving on four double-tracked crawlers, the CT uses a laser guidance system and a leveling system for the journey that keeps the top of a Space Shuttle vertical within plus- or minus-10 minutes of arc. The system enables the CT-MLP-Shuttle to negotiate the ramp leading to the launch pads and keep the load level. Unloaded, the CT weighs 6 million pounds. Seen on top of the MLP are two tail service masts that support the fluid, gas and electrical requirements of the orbiter’s liquid oxygen and liquid hydrogen aft umbilicals.

    NASA Image and Video Library

    2003-08-18

    KENNEDY SPACE CENTER, FLA. - Crawler-transporter (CT) number 2, moves away from the Vehicle Assembly Building with a Mobile Launcher Platform (MLP) on top on a test run to the launch pad. The CT recently underwent modifications to the cab. The CT moves Space Shuttle vehicles, situated on the MLP, between the VAB and launch pad. Moving on four double-tracked crawlers, the CT uses a laser guidance system and a leveling system for the journey that keeps the top of a Space Shuttle vertical within plus- or minus-10 minutes of arc. The system enables the CT-MLP-Shuttle to negotiate the ramp leading to the launch pads and keep the load level. Unloaded, the CT weighs 6 million pounds. Seen on top of the MLP are two tail service masts that support the fluid, gas and electrical requirements of the orbiter’s liquid oxygen and liquid hydrogen aft umbilicals.

  13. KENNEDY SPACE CENTER, FLA. - Crawler-transporter (CT) number 2 nears the launch pad with a Mobile Launcher Platform (MLP) on top. After recent modifications to the cab and muffler system, the CT was taken on a test run. The CT moves Space Shuttle vehicles, situated on the MLP, between the VAB and launch pad. Moving on four double-tracked crawlers, the CT uses a laser guidance system and a leveling system for the journey that keeps the top of a Space Shuttle vertical within plus- or minus-10 minutes of arc. The system enables the CT-MLP-Shuttle to negotiate the ramp leading to the launch pads and keep the load level. Unloaded, the CT weighs 6 million pounds. Seen on top of the MLP are two tail service masts that support the fluid, gas and electrical requirements of the orbiter’s liquid oxygen and liquid hydrogen aft umbilicals.

    NASA Image and Video Library

    2003-08-19

    KENNEDY SPACE CENTER, FLA. - Crawler-transporter (CT) number 2 nears the launch pad with a Mobile Launcher Platform (MLP) on top. After recent modifications to the cab and muffler system, the CT was taken on a test run. The CT moves Space Shuttle vehicles, situated on the MLP, between the VAB and launch pad. Moving on four double-tracked crawlers, the CT uses a laser guidance system and a leveling system for the journey that keeps the top of a Space Shuttle vertical within plus- or minus-10 minutes of arc. The system enables the CT-MLP-Shuttle to negotiate the ramp leading to the launch pads and keep the load level. Unloaded, the CT weighs 6 million pounds. Seen on top of the MLP are two tail service masts that support the fluid, gas and electrical requirements of the orbiter’s liquid oxygen and liquid hydrogen aft umbilicals.

  14. KENNEDY SPACE CENTER, FLA. - A closeup of crawler-transporter (CT) number 2 shows the cab, at left, that recently underwent modifications. The CT is transporting a Mobile Launch Platform (MLP) on a test run to the pad. The CT moves Space Shuttle vehicles, situated on the MLP, between the VAB and launch pad. Moving on four double-tracked crawlers, the CT uses a laser guidance system and a leveling system for the journey that keeps the top of a Space Shuttle vertical within plus- or minus-10 minutes of arc. The system enables the CT-MLP-Shuttle to negotiate the ramp leading to the launch pads and keep the load level. Unloaded, the CT weighs 6 million pounds. Seen on top of the MLP are two tail service masts that support the fluid, gas and electrical requirements of the orbiter’s liquid oxygen and liquid hydrogen aft umbilicals.

    NASA Image and Video Library

    2003-08-18

    KENNEDY SPACE CENTER, FLA. - A closeup of crawler-transporter (CT) number 2 shows the cab, at left, that recently underwent modifications. The CT is transporting a Mobile Launch Platform (MLP) on a test run to the pad. The CT moves Space Shuttle vehicles, situated on the MLP, between the VAB and launch pad. Moving on four double-tracked crawlers, the CT uses a laser guidance system and a leveling system for the journey that keeps the top of a Space Shuttle vertical within plus- or minus-10 minutes of arc. The system enables the CT-MLP-Shuttle to negotiate the ramp leading to the launch pads and keep the load level. Unloaded, the CT weighs 6 million pounds. Seen on top of the MLP are two tail service masts that support the fluid, gas and electrical requirements of the orbiter’s liquid oxygen and liquid hydrogen aft umbilicals.

  15. KENNEDY SPACE CENTER, FLA. - A closeup of crawler-transporter (CT) number 2 shows the cab (left, above the tracks) that recently underwent modifications. The CT is transporting a Mobile Launch Platform (MLP) on a test run to the pad. The CT moves Space Shuttle vehicles, situated on the MLP, between the VAB and launch pad. Moving on four double-tracked crawlers, the CT uses a laser guidance system and a leveling system for the journey that keeps the top of a Space Shuttle vertical within plus- or minus-10 minutes of arc. The system enables the CT-MLP-Shuttle to negotiate the ramp leading to the launch pads and keep the load level. Unloaded, the CT weighs 6 million pounds. Seen on top of the MLP are two tail service masts that support the fluid, gas and electrical requirements of the orbiter’s liquid oxygen and liquid hydrogen aft umbilicals.

    NASA Image and Video Library

    2003-08-18

    KENNEDY SPACE CENTER, FLA. - A closeup of crawler-transporter (CT) number 2 shows the cab (left, above the tracks) that recently underwent modifications. The CT is transporting a Mobile Launch Platform (MLP) on a test run to the pad. The CT moves Space Shuttle vehicles, situated on the MLP, between the VAB and launch pad. Moving on four double-tracked crawlers, the CT uses a laser guidance system and a leveling system for the journey that keeps the top of a Space Shuttle vertical within plus- or minus-10 minutes of arc. The system enables the CT-MLP-Shuttle to negotiate the ramp leading to the launch pads and keep the load level. Unloaded, the CT weighs 6 million pounds. Seen on top of the MLP are two tail service masts that support the fluid, gas and electrical requirements of the orbiter’s liquid oxygen and liquid hydrogen aft umbilicals.

  16. Attitudes of women of advanced maternal age undergoing invasive prenatal diagnosis and the impact of genetic counselling

    PubMed Central

    Godino, Lea; Pompilii, Eva; D'Anna, Federica; Morselli-Labate, Antonio M; Nardi, Elena; Seri, Marco; Rizzo, Nicola; Pilu, Gianluigi; Turchetti, Daniela

    2016-01-01

    Despite the increasing availability and effectiveness of non-invasive screening for foetal aneuploidies, most women of advanced maternal age (AMA) still opt for invasive tests. A retrospective cross-sectional survey was performed on women of AMA undergoing prenatal invasive procedures, in order to explore their motivations and the outcome of preliminary genetic counselling according to the approach (individual or group) adopted. Of 687 eligible women, 221 (32.2%) participated: 117 had received individual counselling, while 104 had attended group sessions. The two groups did not differ by socio-demographic features. The commonest reported reason to undergo invasive tests was AMA itself (67.4%), while only 10.4% of women mentioned the opportunity of making informed choices. The majority perceived as clear and helpful the information received at counselling, and only 12.7% had doubts left that, however, often concerned non-pertinent issues. The impact of counselling on risk perception and decisions was limited: a minority stated their perceived risk of foetal abnormalities had either increased (6.8%) or reduced (3.6%), and only one eventually declined invasive test. The 52.6% of women expressed a preference toward individual counselling, which also had a stronger impact on perceived risk reduction (P=0.003). Nevertheless, group counselling had a more favourable impact on both clarity of understanding and helpfulness (P=0.0497 and P=0.035, respectively). The idea that AMA represents an absolute indication for invasive tests appears deeply rooted; promotion of non-invasive techniques may require extensive educational efforts targeted to both the general population and health professionals. PMID:26014424

  17. KSC-04pd1228

    NASA Image and Video Library

    2004-05-25

    KENNEDY SPACE CENTER, FLA. - In the Vehicle Assembly Building (VAB), Scott Thurston looks at pieces of Columbia debris being prepared for transfer to the shipping facility before their delivery to The Aerospace Corporation in El Segundo, Calif. Thurston is the Columbia debris coordinator. The pieces have been released for loan to the non-governmental agency for testing and research. The Aerospace Corporation requested and will receive graphite/epoxy honeycomb skins from an Orbital Maneuvering System pod, Main Propulsion System Helium tanks, a Reaction Control System Helium tank and a Power Reactant Storage Distribution system tank. The company will use the parts to study re-entry effects on composite materials. NASA notified the Columbia crew’s families about the loan before releasing the items for study. Researchers believe the testing will show how materials are expected to respond to various heating and loads' environments. The findings will help calibrate tools and models used to predict hazards to people and property from reentering hardware. The Aerospace Corporation will have the debris for one year to perform analyses to estimate maximum temperatures during reentry based upon the geometry and mass of the recovered composite. Columbia’s debris is stored in the VAB.

  18. KSC-04PD-1228

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. In the Vehicle Assembly Building (VAB), Scott Thurston looks at pieces of Columbia debris being prepared for transfer to the shipping facility before their delivery to The Aerospace Corporation in El Segundo, Calif. Thurston is the Columbia debris coordinator. The pieces have been released for loan to the non-governmental agency for testing and research. The Aerospace Corporation requested and will receive graphite/epoxy honeycomb skins from an Orbital Maneuvering System pod, Main Propulsion System Helium tanks, a Reaction Control System Helium tank and a Power Reactant Storage Distribution system tank. The company will use the parts to study re-entry effects on composite materials. NASA notified the Columbia crews families about the loan before releasing the items for study. Researchers believe the testing will show how materials are expected to respond to various heating and loads' environments. The findings will help calibrate tools and models used to predict hazards to people and property from reentering hardware. The Aerospace Corporation will have the debris for one year to perform analyses to estimate maximum temperatures during reentry based upon the geometry and mass of the recovered composite. Columbias debris is stored in the VAB.

  19. KSC-2010-5891

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- The moon shines brightly over space shuttle Discovery following a total lunar eclipse as the spacecraft waits to roll back from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The move was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett

  20. KSC-2010-5917

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter, which is in front of the shuttle. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frank Michaux

  1. KSC-2010-5913

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter, which is in front of the shuttle. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frank Michaux

  2. KSC-2010-5905

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frank Michaux

  3. KSC-2010-5909

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter, which is to the left of the shuttle. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frank Michaux

  4. KSC-2010-5890

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- The beginning of a total lunar eclipse hovers over the top of space shuttle Discovery as the spacecraft waits to roll back from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The move was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett

  5. KSC-2010-5910

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter, which is in front of the shuttle. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frank Michaux

  6. KSC-2010-5892

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- The moon shines brightly over space shuttle Discovery following a total lunar eclipse as the spacecraft waits to roll back from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The move was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett

  7. KSC-2010-5906

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter, which is to the left of the shuttle. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frank Michaux

  8. KSC-2010-5894

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery shares the stage with the moon following a total lunar eclipse as the spacecraft waits to roll back from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The move was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett

  9. KSC-2010-5904

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frank Michaux

  10. KSC-2010-5908

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter, which is to the left of the shuttle. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frank Michaux

  11. KSC-2010-5907

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frank Michaux

  12. KSC-2010-5916

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter, which is in front of the shuttle. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frank Michaux

  13. KSC-2010-5914

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frank Michaux

  14. KSC-2010-5912

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter, which is in front of the shuttle. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frank Michaux

  15. KSC-2010-5903

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frank Michaux

  16. KSC-2010-5889

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- The beginning of a total lunar eclipse illuminates the top of space shuttle Discovery as the spacecraft waits to roll back from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The move was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett

  17. KSC-2010-5911

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter, which is in front of the shuttle. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frank Michaux

  18. KSC-2010-5893

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- The moon shines brightly over space shuttle Discovery following a total lunar eclipse as the spacecraft waits to roll back from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. The move was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Kim Shiflett

  19. KSC-2010-5915

    NASA Image and Video Library

    2010-12-21

    CAPE CANAVERAL, Fla. -- Space shuttle Discovery awaits its move, called rollback, from Launch Pad 39A to the Vehicle Assembly Building (VAB) at NASA's Kennedy Space Center in Florida. Rollback was scheduled for 12:30 a.m., but was postponed until 10 p.m. so technicians could resolve an issue with a leveling system on the crawler-transporter, which is in front of the shuttle. Once inside the VAB, Discovery's external fuel tank will be examined and foam reapplied where 89 sensors were installed on the tank's aluminum skin for an instrumented tanking test on Dec. 17. The sensors were used to measure changes in the tank as super-cold propellants were pumped in and drained out. Data and analysis from the test will be used to determine what caused the tops of two, 21-foot-long support beams, called stringers, on the outside of the intertank to crack during fueling on Nov. 5. Discovery's next launch opportunity to the International Space Station on the STS-133 mission is no earlier than Feb. 3, 2011. For more information on STS-133, visit www.nasa.gov/mission_pages/shuttle/shuttlemissions/sts133/. Photo credit: NASA/Frank Michaux

  20. A System for Measuring the Sway of the Vehicle Assembly Building

    NASA Technical Reports Server (NTRS)

    Youngquist, Robert; Starr, Stanley; Lane, John; Simmons, Stephen; Ihlefeld, Curtis

    2013-01-01

    A system was developed to measure the sway of the Vehicle Assembly Building (VAB) at Kennedy Space Center. This system was installed in the VAB and gathered more than one total year of data. The building movement was correlated with measurements provided by three wind towers in order to determine the maximum deflection of the building during high-wind events. The VAB owners were in the process of obtaining new platforms for use in assembling very tall rockets when analysis of the VAB showed that a high wind could move the building sufficiently that an upper platform might impact a rocket. The problem arises because safety requires a relatively small gap between the platform and the rocket, while a large enough gap is needed to ensure that stacking tolerances prevent contact between the rocket and the platform. This only leaves an inch or two (approximately 2 to 5 cm) of total clearance, so when the analysis showed that more than a couple of inches of motion could occur in a high wind, there was a potential for damaging the rocket. The KSC Applied Physics Laboratory was asked to install a system in the VAB that could measure the motion of the building in high winds to determine the actual building sway. The motion of the VAB roof under wind load was measured optically, and under analysis, it was determined that a relatively large-aperture optical system would be required to reduce diffraction effects to less than a small fraction of an inch (approximately mm) at a distance of 500 ft (˜150 m). A 10-in. (approximately 250 mm) telescope was placed on the floor of the building, looking at the ceiling. On the ceiling, a flat plate with three white LEDs was mounted in an "L" shape, such that the telescope was essentially looking at three stars. Software was written to track the motion of these three points using an image processing system. This provided a better than 1/10-in. (approximately 2.5-mm) 2D measurement faster than once a second. Data was downloaded once a

  1. A Survey of Methods for Measuring Thermally Induced Distortions of Test Articles Undergoing Solar Thermal Vacuum Test

    NASA Technical Reports Server (NTRS)

    Rempt, R. D.

    1982-01-01

    Various methods of measuring the small thermally induced distortions experienced either by various points on the space vehicles or by deviations of surfaces from a known shape during solar thermal vacuum tests are examined. State-of-the-art application of both photographic and real time observation are discussed. The relative merits of each of the methods are compared and evaluated in their applications to different types of test articles and situations. Magnitudes of thermally induced distortions which may be expected to be routinely measurable by the various methods are presented and compared.

  2. Assessment of demand for prenatal diagnostic testing using willingness to pay.

    PubMed

    Caughey, Aaron B; Washington, A Eugene; Gildengorin, Virginia; Kuppermann, Miriam

    2004-03-01

    To investigate the demand for invasive prenatal diagnostic testing (amniocentesis and chorionic villous sampling) in a racially/ethnically diverse group of pregnant women of all ages in the San Francisco Bay Area by using estimates of willingness to pay for these procedures. We surveyed 447 women of varying ages, ethnicity, and socioeconomic levels to assess their desire to undergo and willingness to pay for invasive prenatal testing for chromosomal disorders. Each woman was asked what she would be willing to pay for invasive diagnostic testing up to the full cost of the procedure. We also asked several demographic and attitudinal questions. Overall, 49% of the women indicated an interest in undergoing invasive prenatal diagnostic testing. Women aged 35 years and older were more likely to desire testing as compared with women aged less than 35 years (72% versus 36%, P <.001). Of the women aged less than 35 years who desired testing, 31% indicated that they would be willing to pay the full price of $1,300, whereas 73% were willing to pay a portion of the cost. Maternal age of 35 years or greater (odds ratio [OR] 3.3; 95% confidence interval [CI] 2.0, 5.6) and willingness to have an elective abortion (OR 2.8; 95% CI 1.6, 4.9) were significant predictors of desire to undergo prenatal diagnostic testing after controlling for income, race/ethnicity, and education. Maternal age of 35 years or greater (OR 3.5; 95% CI 1.59, 7.88) and having an income greater than $35,000 (OR 2.3; 95% CI 1.02, 5.26) were significant predictors of willingness to pay the full price of testing. A substantial proportion of women of all ages indicate a desire to undergo and a willingness to pay for prenatal diagnostic testing. Variations in willingness to pay are correlated with both socioeconomic and attitudinal differences in addition to age. Guidelines regarding use of prenatal genetic diagnosis should be expanded to offer testing to all women, not just those deemed at increased risk. II-2

  3. KSC-04pd0664

    NASA Image and Video Library

    2004-03-26

    CAPE CANAVERAL, Fla. -- This aerial photo shows the expanse of the Launch Complex 39 Area, bordered on the east by the Atlantic Ocean and cloud-filled sky. At center right, towering above the surrounding sites, is the Vehicle Assembly Building. To the left, or north, is the Orbiter Processing Facility’s Bay 3. On the western side are OPF Bays 1 and 2. In the lower right corner is the Operations Support Building. The two-lane crawlerway stretches from the VAB toward the coast, site of Launch Pad 39A, closest, and Launch Pad 39B, far left. Between the VAB and the ocean sprawl the Banana Creek and the Banana River. The turn basin, at right, allows delivery of external tanks that are offloaded close to and transported to the VAB. Photo credit: NASA

  4. The prevalence of iron deficiency anaemia in patients undergoing bariatric surgery.

    PubMed

    Khanbhai, M; Dubb, S; Patel, K; Ahmed, A; Richards, T

    2015-01-01

    As bariatric surgery rates continue to climb, anaemia will become an increasing concern. We assessed the prevalence of anaemia and length of hospital stay in patients undergoing bariatric surgery. Prospective data (anaemia [haemoglobin <12 g/dL], haematinics and length of hospital stay) was analysed on 400 hundred patients undergoing elective laparoscopic bariatric surgery. Results from a prospective database of 1530 patients undergoing elective general surgery were used as a baseline. Fifty-seven patients (14%) were anaemic pre-operatively, of which 98% were females. Median MCV (fL) and overall median ferritin (μg/L) was lower in anaemic patients (83 vs. 86, p=0.001) and (28 vs. 61, p<0.0001) respectively. In the elective general surgery patients, prevalence of anaemia was similar (14% vs. 16%) but absolute iron deficiency was more common in those undergoing bariatric surgery; microcytosis p<0.0001, ferritin <30 p<0.0001. Mean length of stay (days) was increased in the anaemic compared to in the non-anaemic group (2.7 vs. 1.9) and patients who were anaemic immediately post-operatively, also had an increased length of stay (2.7 vs. 1.9), p<0.05. Absolute iron deficiency was more common in patients undergoing bariatric surgery. In bariatric patients with anaemia there was an overall increased length of hospital stay. Copyright © 2013 Asian Oceanian Association for the Study of Obesity. Published by Elsevier Ltd. All rights reserved.

  5. Hypovitaminosis D in patients undergoing kidney transplant: the importance of sunlight exposure

    PubMed Central

    Vilarta, Cristiane F.; Unger, Marianna D.; dos Reis, Luciene M.; Dominguez, Wagner V.; David-Neto, Elias; Moysés, Rosa M.; Titan, Silvia; Custodio, Melani R.; Hernandez, Mariel J.; Jorgetti, Vanda

    2017-01-01

    OBJECTIVES: Recent studies have shown a high prevalence of hypovitaminosis D, defined as a serum 25-hydroxyvitamin D level less than 30 ng/ml, in both healthy populations and patients with chronic kidney disease. Patients undergoing kidney transplant are at an increased risk of skin cancer and are advised to avoid sunlight exposure. Therefore, these patients might share two major risk factors for hypovitaminosis D: chronic kidney disease and low sunlight exposure. This paper describes the prevalence and clinical characteristics of hypovitaminosis D among patients undergoing kidney transplant. METHODS: We evaluated 25-hydroxyvitamin D serum levels in a representative sample of patients undergoing kidney transplant. We sought to determine the prevalence of hypovitaminosis D, compare these patients with a control group, and identify factors associated with hypovitaminosis D (e.g., sunlight exposure and dietary habits). RESULTS: Hypovitaminosis D was found in 79% of patients undergoing kidney transplant, and the major associated factor was low sunlight exposure. These patients had higher creatinine and intact parathyroid hormone serum levels, with 25-hydroxyvitamin D being inversely correlated with intact parathyroid hormone serum levels. Compared with the control group, patients undergoing kidney transplant presented a higher prevalence of 25-hydroxyvitamin D deficiency and lower serum calcium, phosphate and albumin but higher creatinine and intact parathyroid hormone levels. CONCLUSIONS: Our results confirmed the high prevalence of hypovitaminosis D in patients undergoing kidney transplant. Therapeutic strategies such as moderate sunlight exposure and vitamin D supplementation should be seriously considered for this population. PMID:28793001

  6. Coagulation management in patients undergoing neurosurgical procedures.

    PubMed

    Robba, Chiara; Bertuetti, Rita; Rasulo, Frank; Bertuccio, Alessando; Matta, Basil

    2017-10-01

    Management of coagulation in neurosurgical procedures is challenging. In this contest, it is imperative to avoid further intracranial bleeding. Perioperative bleeding can be associated with a number of factors, including anticoagulant drugs and coagulation status but is also linked to the characteristic and the site of the intracranial disorder. The aim of this review will be to focus primarily on the new evidence regarding the management of coagulation in patients undergoing craniotomy for neurosurgical procedures. Antihemostatic and anticoagulant drugs have shown to be associated with perioperative bleeding. On the other hand, an increased risk of venous thromboembolism and hypercoagulative state after elective and emergency neurosurgery, in particular after brain tumor surgery, has been described in several patients. To balance the risk between thrombosis and bleeding, it is important to be familiar with the perioperative changes in coagulation and with the recent management guidelines for anticoagulated patients undergoing neurosurgical procedures, in particular for those taking new direct anticoagulants. We have considered the current clinical trials and literature regarding both safety and efficacy of deep venous thrombosis prophylaxis in the neurosurgical population. These were mainly trials concerning both elective surgical and intensive care patients with a poor grade intracranial bleed or multiple traumas with an associated severe traumatic brain injury (TBI). Coagulation management remains a major issue in patients undergoing neurosurgical procedures. However, in this field of research, literature quality is poor and further studies are necessary to identify the best strategies to minimize risks in this group of patients.

  7. Speech profile of patients undergoing primary palatoplasty.

    PubMed

    Menegueti, Katia Ignacio; Mangilli, Laura Davison; Alonso, Nivaldo; Andrade, Claudia Regina Furquim de

    2017-10-26

    To characterize the profile and speech characteristics of patients undergoing primary palatoplasty in a Brazilian university hospital, considering the time of intervention (early, before two years of age; late, after two years of age). Participants were 97 patients of both genders with cleft palate and/or cleft and lip palate, assigned to the Speech-language Pathology Department, who had been submitted to primary palatoplasty and presented no prior history of speech-language therapy. Patients were divided into two groups: early intervention group (EIG) - 43 patients undergoing primary palatoplasty before 2 years of age and late intervention group (LIG) - 54 patients undergoing primary palatoplasty after 2 years of age. All patients underwent speech-language pathology assessment. The following parameters were assessed: resonance classification, presence of nasal turbulence, presence of weak intraoral air pressure, presence of audible nasal air emission, speech understandability, and compensatory articulation disorder (CAD). At statistical significance level of 5% (p≤0.05), no significant difference was observed between the groups in the following parameters: resonance classification (p=0.067); level of hypernasality (p=0.113), presence of nasal turbulence (p=0.179); presence of weak intraoral air pressure (p=0.152); presence of nasal air emission (p=0.369), and speech understandability (p=0.113). The groups differed with respect to presence of compensatory articulation disorders (p=0.020), with the LIG presenting higher occurrence of altered phonemes. It was possible to assess the general profile and speech characteristics of the study participants. Patients submitted to early primary palatoplasty present better speech profile.

  8. Oral lesions in HIV+/AIDS adolescents perinatally infected undergoing HAART.

    PubMed

    Gaitán-Cepeda, Luis-Alberto; Domínguez-Sánchez, Anitza; Pavía-Ruz, Noris; Muñoz-Hernández, Rocío; Verdugo-Díaz, Roberto; Valles-Medina, Ana-María; Meráz-Acosta, Héctor

    2010-07-01

    To assess the prevalence of the oral lesions related to HIV-infection (HIV-OL) in HIV+/AIDS adolescents (=13 years old), and the differences with HIV+/AIDS children (=3 - <13 years old) perinatally infected. 25 HIV+/AIDS adolescents and 62 HIV+/AIDS children, undergoing Highly Active Antiretroviral Therapy, were orally examined. HIV-OL was diagnosed in accordance with EC-Clearinghouse-World Health Organization. The patients were classifies with respect to their immune status in relation with the CD4+ cell counts as moderately immunodeficient; mildly immunodeficient and severely immunodeficient in accordance to the revised surveillance case definitions for HIV infection among adults, adolescents, and children aged <18 months and for HIV infection and AIDS among children aged 18 months to <13 years (CDC-USA). The virological status was established in relation to the copies of RNA-HIV-1/mL as follows: with undetectable viral load (UDVL); with low viral load and with high viral load. A chi-square test was performed (p<0.05 IC95%). The prevalence of HIV-OL in HIV+/AIDS adolescents was 20% while in HIV/AIDS children was 30.6% (p>0.05). Oral candidiasis was the most prevalent oral lesion in both groups. Association (p<0.05) of a high prevalence of HIV-OL and oral candidiasis with a high viral load was observed in both study groups. Adolescents perinatally HIV-infected have a high prevalence of HIV-OL. Oral Candidiasis still is the most frequent oral opportunistic infection. Oral lesions could have association to viral failure in HIV+/AIDS adolescents undergoing HAART.

  9. Pre-test probability of obstructive coronary stenosis in patients undergoing coronary CT angiography: Comparative performance of the modified diamond-Forrester algorithm versus methods incorporating cardiovascular risk factors.

    PubMed

    Ferreira, António Miguel; Marques, Hugo; Tralhão, António; Santos, Miguel Borges; Santos, Ana Rita; Cardoso, Gonçalo; Dores, Hélder; Carvalho, Maria Salomé; Madeira, Sérgio; Machado, Francisco Pereira; Cardim, Nuno; de Araújo Gonçalves, Pedro

    2016-11-01

    Current guidelines recommend the use of the Modified Diamond-Forrester (MDF) method to assess the pre-test likelihood of obstructive coronary artery disease (CAD). We aimed to compare the performance of the MDF method with two contemporary algorithms derived from multicenter trials that additionally incorporate cardiovascular risk factors: the calculator-based 'CAD Consortium 2' method, and the integer-based CONFIRM score. We assessed 1069 consecutive patients without known CAD undergoing coronary CT angiography (CCTA) for stable chest pain. Obstructive CAD was defined as the presence of coronary stenosis ≥50% on 64-slice dual-source CT. The three methods were assessed for calibration, discrimination, net reclassification, and changes in proposed downstream testing based upon calculated pre-test likelihoods. The observed prevalence of obstructive CAD was 13.8% (n=147). Overestimations of the likelihood of obstructive CAD were 140.1%, 9.8%, and 18.8%, respectively, for the MDF, CAD Consortium 2 and CONFIRM methods. The CAD Consortium 2 showed greater discriminative power than the MDF method, with a C-statistic of 0.73 vs. 0.70 (p<0.001), while the CONFIRM score did not (C-statistic 0.71, p=0.492). Reclassification of pre-test likelihood using the 'CAD Consortium 2' or CONFIRM scores resulted in a net reclassification improvement of 0.19 and 0.18, respectively, which would change the diagnostic strategy in approximately half of the patients. Newer risk factor-encompassing models allow for a more precise estimation of pre-test probabilities of obstructive CAD than the guideline-recommended MDF method. Adoption of these scores may improve disease prediction and change the diagnostic pathway in a significant proportion of patients. Copyright © 2016 Elsevier Ireland Ltd. All rights reserved.

  10. Multi-Axis Test Facility Orientation

    NASA Image and Video Library

    1960-03-01

    Seven Astronauts and William North undergo Multi Axis Space Test Inertia Facility (MASTIF) orientation: This film contains footage Gus Grissom leaving "Astro-Penthouse" and beginning tests, pilot Joe Algranti explaining the MASTIF to Scott Carpenter, Walter Schirra testing the controls and being strapped in, Deke Slayton climbing into the rig, and John Glenn preparing for test and being briefed by Algranti. Also seen are Alan Shepherd talking with Algranti and James Useller prior to climbing into rig and beginning test, Gordon Cooper being strapped in and beginning his test, Cooper and Algranti briefing to William North prior to his test. North was a test pilot on the NASA committee which selected the Mercury 7 astronauts.

  11. Postoperative Functional Recovery After Gastrectomy in Patients Undergoing Enhanced Recovery After Surgery

    PubMed Central

    Jeong, Oh; Ryu, Seong Yeob; Park, Young Kyu

    2016-01-01

    Abstract Enhanced recovery after surgery (ERAS) is increasingly used in several abdominal surgeries to accelerate postoperative recovery and reduce the length of stay. The aim of this study was to investigate the pattern of functional recovery after gastrectomy in patients undergoing ERAS and to analyze factors that affect postoperative recovery. In all, 168 gastric cancer patients enrolled in a clinical trial evaluating ERAS compliance after gastrectomy were prospectively assessed with respect to postoperative functional recovery using discharge criteria, evaluating 4 major functional outcomes: adequate pain control, ability to mobilize and self-care, tolerance of oral intake, and no abnormal physical findings or laboratory test. The mean completion time of overall discharge criteria was 5.1 ± 3.2 days. The mean completion time for each dimension were 4.4 ± 0.9 days for adequate pain control, 4.1 ± 0.8 days for ability to mobilize and self-care, 4.3 ± 1.1 days for no abnormal physical signs or laboratory test, and 4.6 ± 1.2 days for tolerance of oral intake. The mean length of stay was 7.2 ± 3.2 days, and readmission rate was 2.4% (n = 4). There was 9.5% (n = 16) of morbidity and no hospital mortality. Female sex (P < 0.001) and age (≥65 years; P = 0.049) were significantly associated with a slower recovery in tolerance of oral intake, and total gastrectomy was significantly associated with delayed completion of adequate pain control (P = 0.003). Functional recovery after gastrectomy can be achieved after about 5 days in patients undergoing ERAS. Female sex, old age, and total gastrectomy are factors that delay normal functional recovery after gastrectomy. PMID:27057836

  12. Factors That Influence Surgical Margin State in Patients Undergoing Cold Knife Conization - A Single Center Experience.

    PubMed

    Aluloski, Igor; Tanturovski, Mile; Petrusevska, Gordana; Jovanovic, Rubens; Kostadinova-Kunovska, Slavica

    2017-12-01

    To evaluate the factors that influence the surgical margin state in patients undergoing cold knife conization at the University Clinic of Gynecology and Obstetrics in Skopje, Republic of Macedonia Materials and methods: We have retrospectively analyzed the medical records of all patients that underwent a cold knife conization at our Clinic in 2015. We cross-referenced the surgical margin state with the histopathological diagnosis (LSIL, HSIL or micro-invasive/invasive cancer), menopausal status of the patients, number of pregnancies, surgeon experience, operating time and cone depth. The data was analyzed with the Chi square test, Fisher's exact test for categorical data and Student's T test for continuous data and univariate and multivariate logistical regressions were performed. A total of 246 medical records have neen analyzed, out of which 29 (11.79%) patients had LSIL, 194 (78.86%) had HSIL and 23 (9.34%) patients suffered micro-invasive/invasive cervical cancer. The surgical margins were positive in 78 (31.7%) of the patients. The average age of the patients was 41.13 and 35 (14.23%) of the patients were menopausal. The multivariate logistic regression identified preoperative forceps biopsy of micro-invasive SCC, HSIL or higher cone specimen histology and shorter cone depth as independent predictors of surgical margin involvement in patients undergoing cold knife conization. In the current study, we have found no association between the inherent characteristics of the patient and the surgeon and the surgical margin state after a CKC. The most important predictors for positive margins were the severity of the lesion and the cone depth.

  13. 14 CFR 417.305 - Command control system testing.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 4 2010-01-01 2010-01-01 false Command control system testing. 417.305..., DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH SAFETY Flight Safety System § 417.305 Command control system testing. (a) General. (1) A command control system, including its subsystems and components must undergo...

  14. 14 CFR 417.305 - Command control system testing.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 4 2012-01-01 2012-01-01 false Command control system testing. 417.305..., DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH SAFETY Flight Safety System § 417.305 Command control system testing. (a) General. (1) A command control system, including its subsystems and components must undergo...

  15. 14 CFR 417.305 - Command control system testing.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 4 2013-01-01 2013-01-01 false Command control system testing. 417.305..., DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH SAFETY Flight Safety System § 417.305 Command control system testing. (a) General. (1) A command control system, including its subsystems and components must undergo...

  16. 14 CFR 417.305 - Command control system testing.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 4 2014-01-01 2014-01-01 false Command control system testing. 417.305..., DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH SAFETY Flight Safety System § 417.305 Command control system testing. (a) General. (1) A command control system, including its subsystems and components must undergo...

  17. 14 CFR 417.305 - Command control system testing.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 4 2011-01-01 2011-01-01 false Command control system testing. 417.305..., DEPARTMENT OF TRANSPORTATION LICENSING LAUNCH SAFETY Flight Safety System § 417.305 Command control system testing. (a) General. (1) A command control system, including its subsystems and components must undergo...

  18. Can mesenchymal cells undergo collective cell migration?

    PubMed Central

    Theveneau, Eric

    2011-01-01

    Cell migration is critical for proper development of the embryo and is also used by many cell types to perform their physiological function. For instance, cell migration is essential for immune cells to monitor the body and for epithelial cells to heal a wound whereas, in cancer cells, acquisition of migratory capabilities is a critical step toward malignancy. Migratory cells are often categorized into two groups: (1) mesenchymal cells, produced by an epithelium-to-mesenchyme transition, that undergo solitary migration and (2) epithelial-like cells which migrate collectively. However, on some occasions, mesenchymal cells may travel in large, dense groups and exhibit key features of collectively migrating cells such as coordination and cooperation. Here, using data published on neural crest cells, a highly invasive mesenchymal cell population that extensively migrate throughout the embryo, we explore the idea that mesenchymal cells, including cancer cells, might be able to undergo collective cell migration under certain conditions and discuss how they could do so. PMID:22274714

  19. Genetic Testing and Post-Testing Decision Making among BRCA-Positive Mutation Women: A Psychosocial Approach.

    PubMed

    Hesse-Biber, Sharlene; An, Chen

    2016-10-01

    Through an analysis of an online survey of women who tested positive for the BRCA genetic mutation for breast cancer, this research uses a social constructionist and feminist standpoint lens to understand the decision-making process that leads BRCA-positive women to choose genetic testing. Additionally, this research examines how they socially construct and understand their risk for developing breast cancer, as well as which treatment options they undergo post-testing. BRCA-positive women re-frame their statistical medical risk for developing cancer and their post-testing treatment choices through a broad psychosocial context of engagement that also includes their social networks. Important psychosocial factors drive women's medical decisions, such as individual feelings of guilt and vulnerability, and the degree of perceived social support. Women who felt guilty and fearful that they might pass the BRCA gene to their children were more likely to undergo risk reducing surgery. Women with at least one daughter and women without children were more inclined toward the risk reducing surgery compared to those with only sons. These psychosocial factors and social network engagements serve as a "nexus of decision making" that does not, for the most part, mirror the medical assessments of statistical odds for hereditary cancer development, nor the specific treatment protocols outlined by the medical establishment.

  20. Self-Confidence and Quality of Life in Women Undergoing Treatment for Breast Cancer

    PubMed Central

    Shafaee, Fahimeh Sehati; Mirghafourvand, Mojgan; Harischi, Sepideh; Esfahani, Ali; Amirzehni, Jalileh

    2018-01-01

    Introduction: Quality of life is an important topic in the study of chronic diseases, especially cancer which can have a major effect on patient self-confidence. This study was conducted to determine quality of life and its relationship with self-confidence in women undergoing treatment for breast cancer. Methods: This cross-sectional, descriptive, analytical study was conducted in 2016 on 166 women with breast cancer undergoing treatment at Ghazi, Al-Zahra, International and/or Shams hospitals in Tabriz. The subjects were selected through convenience sampling. A personal-demographic questionnaire, the Cancer Quality of Life Questionnaire (QLQ-C30), and the Rosenberg Self-Esteem Scale (RSES) were completed for each patient. The data obtained were analyzed using independent t-tests, one-way ANOVA, multivariate linear regression and Pearson’s correlation coefficients. Findings: The mean total score of quality of life was 59.1±17.4, ranging from 0 to 100. The highest mean score was obtained in the cognitive subscale (74.9±23.8) and the lowest in the emotional subscale (51.4±21.1). The mean score for self-confidence was 0.3 with a standard deviation of 0.1, ranging from -1 to +1. There was a significant positive relationship between self-confidence and quality of life, except in three symptom subscales for diarrhea, constipation and loss of appetite (P<0.05). Self-confidence, disease duration, lifestyle, marital satisfaction and caregiver status were among the predictors of quality of life. Discussion: Given the significant relationship between quality of life and self-confidence, health care providers may need to pay special attention to women undergoing treatment for breast cancer and perform timely measures to maintain their belief in themselves. PMID:29582628

  1. KENNEDY SPACE CENTER, FLA. - Workers accompany the orbiter Atlantis as it is towed back to the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

    NASA Image and Video Library

    2003-12-16

    KENNEDY SPACE CENTER, FLA. - Workers accompany the orbiter Atlantis as it is towed back to the Orbiter Processing Facility after spending 10 days in the Vehicle Assembly Building. The hiatus in the VAB allowed work to be performed in the OPF that can only be accomplished while the bay is empty. Work included annual validation of the bay's cranes, work platforms, lifting mechanisms and jack stands. Work resumes to prepare Atlantis for launch in September 2004 on the first return-to-flight mission, STS-114.

  2. Comparison of pre-procedural anxiety and depression scores for patients undergoing chorion villus sampling and amniocentesis: An alternative perspective on prenatal invasive techniques.

    PubMed

    Sanhal, Cem Yasar; Mendilcioglu, Inanc; Ozekinci, Murat; Simsek, Mehmet; Bozkurt, Selen

    2015-01-01

    To compare the pre-procedural anxiety and depression levels of patients undergoing chorion villus sampling (CVS) and amniocentesis (AC). Patients referred to our department for fetal karyotype analysis with a positive first or second trimester screening test for aneuploidy between January 2013 to June 2015 were included. CVS and AC procedures were performed in patients with gestation periods of between 11-14 and 16-20 weeks, respectively. Anxiety was evaluated using the Spielberger State-Trait Anxiety Inventory (STAI), and depression was assessed using the Beck Depression Inventory II (BDI-II). A total of 1,400 patients were included. Compared to first trimester controls, patients undergoing CVS had significantly higher STAI-state and BDI-II results. Likewise, patients undergoing AC had higher STAI-state and BDI-II scores than controls in the second trimester. In terms of STAI-trait results, no difference was found between the groups. Our results also showed that, compared to AC group, patients undergoing CVS had similar STAI-state, STAI-trait and but higher BDI-II scores. We conclude that evaluating the stress and depression levels of these patients should be one of the routine procedures in pregnancy follow-up.

  3. Stress modeling in colloidal dispersions undergoing non-viscometric flows

    NASA Astrophysics Data System (ADS)

    Dolata, Benjamin; Zia, Roseanna

    2017-11-01

    We present a theoretical study of the stress tensor for a colloidal dispersion undergoing non-viscometric flow. In such flows, the non-homogeneous suspension stress depends on not only the local average total stresslet-the sum of symmetric first moments of both the hydrodynamic traction and the interparticle force-but also on the average quadrupole, octupole, and higher-order moments. To compute the average moments, we formulate a six dimensional Smoluchowski equation governing the microstructural evolution of a suspension in an arbitrary fluid velocity field. Under the conditions of rheologically slow flow, where the Brownian relaxation of the particles is much faster than the spatiotemporal evolution of the flow, the Smoluchowski equation permits asymptotic solution, revealing a suspension stress that follows a second-order fluid constitutive model. We obtain a reciprocal theorem and utilize it to show that all constitutive parameters of the second-order fluid model may be obtained from two simpler linear-response problems: a suspension undergoing simple shear and a suspension undergoing isotropic expansion. The consequences of relaxing the assumption of rheologically slow flow, including the appearance of memory and microcontinuum behaviors, are discussed.

  4. Stepping-Motion Motor-Control Subsystem For Testing Bearings

    NASA Technical Reports Server (NTRS)

    Powers, Charles E.

    1992-01-01

    Control subsystem closed-loop angular-position-control system causing motor and bearing under test to undergo any of variety of continuous or stepping motions. Also used to test bearing-and-motor assemblies, motors, angular-position sensors including rotating shafts, and like. Monitoring subsystem gathers data used to evaluate performance of bearing or other article under test. Monitoring subsystem described in article, "Monitoring Subsystem For Testing Bearings" (GSC-13432).

  5. Understanding intention to undergo colonoscopy among intermediate-risk siblings of colorectal cancer patients: a test of a mediational model.

    PubMed

    Manne, Sharon; Markowitz, Arnold; Winawer, Sidney; Guillem, Jose; Meropol, Neal J; Haller, Daniel; Jandorf, Lina; Rakowski, William; Babb, James; Duncan, Terry

    2003-01-01

    There is a need for research to identify factors influencing intentions to undergo colorectal cancer (CRC) screening among family members at risk for CRC. This study tested a mediational model primarily guided by Ronis' elaboration of the Health Belief Model in predicting intention to have colorectal cancer screening among siblings of individuals diagnosed with colorectal cancer prior to age 56 years. Data were collected from 534 siblings of individuals diagnosed with CRC. A baseline survey was administered by telephone. Measures included perceived susceptibility, CRC severity, physician and family support for CRC screening, cancer-specific distress, the closeness of the relationship with the affected sibling, and future intention to have a colonoscopy. Participant age, gender, and number of prior colonoscopies, as well as the stage of the affected patient's cancer and time from the patient's diagnosis to the interview, were controlled for in the analyses. The proposed model was not a good fit to the data. A respecified model was fit to the data. In this model, physician support, family support, and sibling closeness were significantly associated with both perceived benefits and barriers. Perceived severity was associated with barriers. Benefits and barriers, as well as cancer-specific distress, were directly associated with colonoscopy intentions. Results were consistent with a mediational role for benefits and barriers in the associations of sibling closeness and with a mediational role for barriers in the association between perceived severity and colonoscopy intentions. Family and physician support impacted intentions both directly and indirectly through effects on benefits and barriers. Perceived risk was not associated with benefits, barriers, or colonoscopy intentions. Intervention efforts to increase colonoscopy intentions may benefit from targeting family influences, particularly the affected proband in the family, as well as physician influence, cancer

  6. An electronic circuit for sensing malfunctions in test instrumentation

    NASA Technical Reports Server (NTRS)

    Miller, W. M., Jr.

    1969-01-01

    Monitoring device differentiates between malfunctions occurring in the system undergoing test and malfunctions within the test instrumentation itself. Electronic circuits in the monitor use transistors to commutate silicon controlled rectifiers by removing the drive voltage, display circuits are then used to monitor multiple discrete lines.

  7. Development of a mobile application of Breast Cancer e-Support program for women with breast cancer undergoing chemotherapy.

    PubMed

    Zhu, Jiemin; Ebert, Lyn; Xue, Zhimin; Shen, Qu; Chan, Sally Wai-Chi

    2017-01-01

    Women with breast cancer undergoing chemotherapy experience a variety of physical and psychosocial symptoms, which have negative effect on women's quality of life and psychological well-being. Although M-health technologies provides innovative and easily accessible option to provide psychosocial support, mobile phone based interventions remain limited for these women in China. To develop a new mobile application to offer information as well as social and emotional support to women with breast cancer undergoing chemotherapy to promote their self-efficacy and social support, thus improving symptom management strategies. Basing on previous theoretical framework which incorporated Bandura's self-efficacy theory and the social exchange theory, a new mobile application, called Breast Cancer e-Support Program (BCS) was designed, with the content and functionality being validated by the expert panel and women with breast cancer. BCS App program has four modules: 1) Learning forum; 2) Discussion forum; 3) Ask-the-Expert forum; and 4) Personal Stories forum. BCS program can be applied on both android mobile phones and iPhones to reach more women. This is the first of its kind developed in China for women with breast cancer undergoing chemotherapy. A randomized controlled trial is undertaking to test the effectiveness of BCS program.

  8. Aerial photo shows Launch Complex 39 Area

    NASA Technical Reports Server (NTRS)

    2000-01-01

    This aerial photo captures many of the facilities involved in Space Shuttle launches. At center is the Vehicle Assembly Building (VAB), with the Launch Control Center at its right. The curved road on the left in the photo is the newly restored crawlerway leading into the VAB high bay 2, where a mobile launcher platform/crawler-transporter sits. The road restoration and high bay 2 are part of KSC's Safe Haven project, enabling the storage of orbiters during severe weather. The crawlerway also extends from the east side out to the two launch pads, one visible close to the road on the left and one to the left of the VAB. In the distance is the Atlantic Ocean. To the right of the crawlerway is the turn basin, into which ships tow the barge for offloading new external tanks from Louisiana.

  9. Profile of Roche's Ariosa Harmony prenatal test.

    PubMed

    Bevilacqua, Elisa; Resta, Serena; Carlin, Andrew; Kang, Xin; Cos Sanchez, Teresa; de Marchin, Jérôme; Jani, Jacques C

    2018-06-18

    Roche's Ariosa Harmony TM Prenatal Test, a noninvasive cfDNA (cell-free DNA) method for major trisomies has been available since January-2013 at the authors unit and tests were sent to California. From July-2017 onwards, prenatal cfDNA has been reimbursed in Belgium for all pregnancies, however since then samples are sent to a local technology transfer center. Little data are available on patient's profile and choices towards cfDNA and on the performance of local technology transfer centers. Areas covered: The profiles and choices of women regarding this test were evaluated. Further, the performance of cfDNA at the local center was compared to the one in California. The results showed that women from the Netherlands, as compared to Belgium, were more likely to undergo cfDNA testing for maternal request and would be less likely to undergo karyotyping if cfDNA were unavailable, and therefore are better candidates for cfDNA testing, when this is used as first-line screening. The local test failure rate was nearly twice that of the main laboratory in California, however when repeated, the success rate was quite high. Expert commentary: The findings highlight the importance of conducting these types of studies, before decisions about clinical implementation are made by national governments and ministries of health.

  10. KSC-03pd2614

    NASA Image and Video Library

    2003-09-15

    KENNEDY SPACE CENTER, FLA. - A flatbed truck carrying pieces of debris of Space Shuttle Columbia arrives outside the Vehicle Assembly Building (VAB). The debris is being transferred from the Columbia Debris Hangar to the VAB for permanent storage. More than 83,000 pieces of debris were shipped to KSC during search and recovery efforts in East Texas. That represents about 38 percent of the dry weight of Columbia, equaling almost 85,000 pounds.

  11. KSC-03pd2225

    NASA Image and Video Library

    2003-07-23

    CAPE CANAVERAL, Fla. -- This view shows much of the Launch Complex 39 Area looking north. At center is the 525-foot-tall Vehicle Assembly Building. Other buildings surrounding it are counter clockwise from left the Orbiter Processing Facility, Multi-Function Facility, Operations Support Building and Launch Control Center, next to the VAB. The crawlerway leads from the VAB toward the launch pads. In the background are the waters of the Banana Creek. Photo credit: NASA

  12. KSC-00padig095

    NASA Image and Video Library

    2000-11-21

    KENNEDY SPACE CENTER, FLA. -- A newly arrived external tank is transported from the turn basin to the Vehicle Assembly Building (VAB), seen behind the tank. External tanks are built by the NASA Michoud Assembly Facility in New Orleans and transported by barge to Cape Canaveral and then up the Banana River to the turn basin in the Launch Complex 39 Area. In the VAB, the tank will await stacking for a future Shuttle mission

  13. 03pd2225

    NASA Image and Video Library

    2003-07-23

    KENNEDY SPACE CENTER, FLA. – This view shows much of the Launch Complex 39 Area looking north. At center is the 525-foot-tall Vehicle Assembly Building. Other buildings surrounding it are (counter clockwise from left) the Orbiter Processing Facility, Multi-Function Facility, Operations Support Building and Launch Control Center (next to VAB). The crawlerway leads from the VAB toward the launch pads. In the background are the waters of the Banana Creek.

  14. KSC00padig096

    NASA Image and Video Library

    2000-11-21

    KENNEDY SPACE CENTER, FLA. -- A newly arrived external tank heads from the turn basin toward the Vehicle Assembly Building (VAB), seen behind the tank. External tanks are built by the NASA Michoud Assembly Facility in New Orleans and transported by barge to Cape Canaveral and then up the Banana River to the turn basin in the Launch Complex 39 Area. In the VAB, the tank will await stacking for a future Shuttle mission

  15. KSC-00padig096

    NASA Image and Video Library

    2000-11-21

    KENNEDY SPACE CENTER, FLA. -- A newly arrived external tank heads from the turn basin toward the Vehicle Assembly Building (VAB), seen behind the tank. External tanks are built by the NASA Michoud Assembly Facility in New Orleans and transported by barge to Cape Canaveral and then up the Banana River to the turn basin in the Launch Complex 39 Area. In the VAB, the tank will await stacking for a future Shuttle mission

  16. ChemCam for Mars Science Laboratory rover, undergoing pre-flight testing

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2011-10-20

    Los Alamos National Laboratory and partners developed a laser instrument, ChemCam, that will ride on the elevated mast of the Mars Science Laboratory rover Curiosity. The system allows Curiosity to "zap" rocks from a distance, reading their chemical composition through spectroscopic analysis. In this video, laboratory shaker-table testing of the instrument ensures that all of its components are solidly attached and resistant to damage from the rigors of launch, travel and landing.

  17. ChemCam for Mars Science Laboratory rover, undergoing pre-flight testing

    ScienceCinema

    None

    2018-06-06

    Los Alamos National Laboratory and partners developed a laser instrument, ChemCam, that will ride on the elevated mast of the Mars Science Laboratory rover Curiosity. The system allows Curiosity to "zap" rocks from a distance, reading their chemical composition through spectroscopic analysis. In this video, laboratory shaker-table testing of the instrument ensures that all of its components are solidly attached and resistant to damage from the rigors of launch, travel and landing.

  18. Performance of PROMIS for Healthy Patients Undergoing Meniscal Surgery.

    PubMed

    Hancock, Kyle J; Glass, Natalie; Anthony, Chris A; Hettrich, Carolyn M; Albright, John; Amendola, Annunziato; Wolf, Brian R; Bollier, Matthew

    2017-06-07

    The Patient-Reported Outcomes Measurement Information System (PROMIS) was developed as an extensive question bank with multiple health domains that could be utilized for computerized adaptive testing (CAT). In the present study, we investigated the use of the PROMIS Physical Function CAT (PROMIS PF CAT) in an otherwise healthy population scheduled to undergo surgery for meniscal injury with the hypotheses that (1) the PROMIS PF CAT would correlate strongly with patient-reported outcome instruments that measure physical function and would not correlate strongly with those that measure other health domains, (2) there would be no ceiling effects, and (3) the test burden would be significantly less than that of the traditional measures. Patients scheduled to undergo meniscal surgery completed the PROMIS PF CAT, Knee injury and Osteoarthritis Outcome Score (KOOS), Marx Knee Activity Rating Scale, Short Form-36 (SF-36), and EuroQol-5 Dimension (EQ-5D) questionnaires. Correlations were defined as high (≥0.7), high-moderate (0.61 to 0.69), moderate (0.4 to 0.6), moderate-weak (0.31 to 0.39), or weak (≤0.3). If ≥15% respondents to a patient-reported outcome measure obtained the highest or lowest possible score, the instrument was determined to have a significant ceiling or floor effect. A total of 107 participants were analyzed. The PROMIS PF CAT had a high correlation with the SF-36 Physical Functioning (PF) (r = 0.82, p < 0.01) and KOOS Sport (r = 0.76, p < 0.01) scores; a high-moderate correlation with the KOOS Quality-of-Life (QOL) (r = 0.63, p < 0.01) and EQ-5D (r = 0.62, p < 0.01) instruments; and a moderate correlation with the SF-36 Pain (r = 0.60, p < 0.01), KOOS Symptoms (r = 0.57, p < 0.01), KOOS Activities of Daily Living (ADL) (r = 0.60, p < 0.01), and KOOS Pain (r = 0.60, p < 0.01) scores. The majority (89%) of the patients completed the PROMIS PF CAT after answering only 4 items. The PROMIS PF CAT had no floor or ceiling effects, with 0% of the

  19. Dental calculus formation in children and adolescents undergoing hemodialysis.

    PubMed

    Martins, Carla; Siqueira, Walter Luiz; Oliveira, Elizabeth; Nicolau, José; Primo, Laura Guimarães

    2012-10-01

    This study aimed to determine whether dental calculus formation is really higher among patients with chronic kidney disease undergoing hemodialysis than among controls. Furthermore, the study evaluated correlations between dental calculus formation and dental plaque, variables that are related to renal disease and/or saliva composition. The Renal Group was composed of 30 patients undergoing hemodialysis, whereas the Healthy Group had 30 clinically healthy patients. Stimulated whole saliva and parotid saliva were collected. Salivary flow rate and calcium and phosphate concentrations were determined. In the Renal Group the saliva collection was carried out before and after a hemodialysis session. Patients from both groups received intraoral exams, oral hygiene instructions, and dental scaling. Three months later, the dental calculus was measured by the Volpe-Manhold method to determine the rate of dental calculus formation. The Renal Group presented a higher rate of dental calculus formation (p < 0.01). Correlation was observed between rate of dental calculus formation and whole saliva flow rate in the Renal Group after a hemodialysis session (r = 0.44, p < 0.05). The presence of dental calculus was associated with phosphate concentration in whole saliva from the Renal Group (p < 0.05). In conclusion, patients undergoing hemodialysis presented accelerated dental calculus formation, probably due to salivary variables.

  20. RF Testing Of Microwave Integrated Circuits

    NASA Technical Reports Server (NTRS)

    Romanofsky, R. R.; Ponchak, G. E.; Shalkhauser, K. A.; Bhasin, K. B.

    1988-01-01

    Fixtures and techniques are undergoing development. Four test fixtures and two advanced techniques developed in continuing efforts to improve RF characterization of MMIC's. Finline/waveguide test fixture developed to test submodules of 30-GHz monolithic receiver. Universal commercially-manufactured coaxial test fixture modified to enable characterization of various microwave solid-state devices in frequency range of 26.5 to 40 GHz. Probe/waveguide fixture is compact, simple, and designed for non destructive testing of large number of MMIC's. Nondestructive-testing fixture includes cosine-tapered ridge, to match impedance wavequide to microstrip. Advanced technique is microwave-wafer probing. Second advanced technique is electro-optical sampling.