Sample records for vacuum breaker check

  1. Latest Trends of Vacuum Circuit Breaker and Related Technologies

    NASA Astrophysics Data System (ADS)

    Kozono, Hideaki; Tanimizu, Toru

    Vacuum Circuit Breakers (VCBs) have been widely used for medium voltage level, because of their performance: compact size, light weight, maintenance free operations and environment-friendly characteristics. They become most comfortable breakers for our needs from other breakers: oil, air, magnetic blast and gas. In this paper the history of vacuum, and latest trends of circuit breakers and related technologies are described, as well as merits or demerits of using vacuum technologies.

  2. Superconducting dc Current Limiting Vacuum Circuit Breaker

    NASA Astrophysics Data System (ADS)

    Alferov, D. F.; Akhmetgareev, M. R.; Budovskii, A. I.; Bunin, R. A.; Voloshin, I. F.; Degtyarenko, P. N.; Yevsin, D. V.; Ivanov, V. P.; Sidorov, V. A.; Fisher, L. M.; Tshai, E. V.

    Acircuitofadc superconductingfault current limiter witha direct current circuit-breaker fora nominal current 300A is proposed. It includes the 2G high temperature superconducting (HTS) tapes and the high-speed dc vacuum circuit breaker.Thetestresultsof current-limitingcapacityandrecoverytimeof superconductivityafter currentfaultatvoltage upto3 kV are presented.

  3. 100-kA vacuum current breaker of a modular design

    NASA Astrophysics Data System (ADS)

    Ivanov, V. P.; Vozdvijenskii, V. A.; Jagnov, V. A.; Solodovnikov, S. G.; Mazulin, A. V.; Ryjkov, V. M.

    1994-05-01

    Direct current breaker of a modular design is developed for the strong field tokamak power supply system. The power supply system comprises four 800 MW alternative current generators with 4 GJ flywheels, thyristor rectifiers providing inductive stores pumping by a current up to 100 kA for 1 - 4 sec. To form current pulses of various shapes in the tokamak windings current breakers are used with either pneumatic or explosive drive, at a current switching synchronously of not worse than 100 mks. Current breakers of these types require that the current conducting elements be replaced after each shot. For recent years vacuum arc quenching chambers with an axial magnetic field are successfully employed as repetitive performance current breakers, basically for currents up to 40 kA. In the report some results of researches of a vacuum switch modular are presented which we used as prototype switch for currents of the order of 100 kA.

  4. The Influence of Vacuum Circuit Breakers and Different Motor Models on Switching Overvoltages in Motor Circuits

    NASA Astrophysics Data System (ADS)

    Wong, Cat S. M.; Snider, L. A.; Lo, Edward W. C.; Chung, T. S.

    Switching of induction motors with vacuum circuit breakers continues to be a concern. In this paper the influence on statistical overvoltages of the stochastic characteristics of vacuum circuit breakers, high frequency models of motors and transformers, and network characteristics, including cable lengths and network topology are evaluated and a general view of the overvoltages phenomena is presented. Finally, a real case study on the statistical voltage levels and risk-of-failure resulting from switching of a vacuum circuit breaker in an industrial installation in Hong Kong is presented.

  5. Vacuum breaker valve assembly

    DOEpatents

    Thompson, J.L.; Upton, H.A.

    1999-04-27

    Breaker valve assemblies for a simplified boiling water nuclear reactor are described. The breaker valve assembly, in one form, includes a valve body and a breaker valve. The valve body includes an interior chamber, and an inlet passage extends from the chamber and through an inlet opening to facilitate transporting particles from outside of the valve body to the interior chamber. The breaker valve is positioned in the chamber and is configured to substantially seal the inlet opening. Particularly, the breaker valve includes a disk which is sized to cover the inlet opening. The disk is movably coupled to the valve body and is configured to move substantially concentrically with respect to the valve opening between a first position, where the disk completely covers the inlet opening, and a second position, where the disk does not completely cover the inlet opening. 1 fig.

  6. Vacuum breaker valve assembly

    DOEpatents

    Thompson, Jeffrey L.; Upton, Hubert Allen

    1999-04-27

    Breaker valve assemblies for a simplified boiling water nuclear reactor are described. The breaker valve assembly, in one form, includes a valve body and a breaker valve. The valve body includes an interior chamber, and an inlet passage extends from the chamber and through an inlet opening to facilitate transporting particles from outside of the valve body to the interior chamber. The breaker valve is positioned in the chamber and is configured to substantially seal the inlet opening. Particularly, the breaker valve includes a disk which is sized to cover the inlet opening. The disk is movably coupled to the valve body and is configured to move substantially concentrically with respect to the valve opening between a first position, where the disk completely covers the inlet opening, and a second position, where the disk does not completely cover the inlet opening.

  7. Development of High Interruption Capability Vacuum Circuit Breaker -Technology of Vacuum Arc Control-

    NASA Astrophysics Data System (ADS)

    Niwa, Yoshimitsu; Kaneko, Eiji

    Vacuum circuit breakers (VCB) have been widely used for power distribution systems. Vacuum Interrupters, which are the current interruption unit, have been increased its interruption capability with the development of vacuum arc control technology by magnetic field. There are three major type electrodes: disk shaped electrodes, radial magnetic field electrodes, axial magnetic field (AMF) electrodes. In the disk shaped electrode, the vacuum arc between the electrodes is not controlled. In the AMF electrode, the vacuum arc is diffused and stabilized by an axial magnetic field, which is parallel to the arc current. In the last type of electrodes, the vacuum arc column is rotated by magnetic force generated by the current flowing in the electrodes. The interruption current and the voltage of one break VCB is increased to 100 kA, 144 kV respectively. This paper describes basic configurations and functions of VCB, vacuum arc control technology in vacuum interrupters, recent researches and applications of VCB.

  8. 40 CFR Table 31 to Subpart G of... - Typical Number of Vacuum Breakers, NF6 and Roof Drains, a NF7

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 40 Protection of Environment 10 2013-07-01 2013-07-01 false Typical Number of Vacuum Breakers, NF6..., and Wastewater Pt. 63, Subpt. G, Table 31 Table 31 to Subpart G of Part 63—Typical Number of Vacuum Breakers, NF6 and Roof Drains, a NF7 Tank diameter D (feet) b No. of vacuum breakers, NF6 Pontoon roof...

  9. Review of 72.5kV double-break vacuum circuit breaker based on rapid repulsion actuator

    NASA Astrophysics Data System (ADS)

    Zhuofan, Tang; Lijun, Qin

    2017-07-01

    72.5kV double-break vacuum circuit breakers based on rapid repulsion actuator remain blank in China. Based on the theoretical analysis and experimental results from researchers, the design of 72.5kV double-break vacuum circuit breakers based on rapid repulsion actuator was presented. It takes the form of double-break, using two standard 40.5kV vacuum interrupter in series at the bottom, which adopt a permanent magnetic repulsion actuator. The permanent magnetic repulsion actuator consists of rapid repulsion actuator and magnetic retentivity actuator. On the basis above, we produced the prototype, and the superiority of the design was verified through the experiments.

  10. An Electromagnetically Actuated Vacuum Circuit Breaker Developed by Electromagnetic Analysis Coupled with Motion

    NASA Astrophysics Data System (ADS)

    Takeuchi, Toshie; Nakagawa, Takafumi; Tsukima, Mitsuru; Koyama, Kenichi; Tohya, Nobumoto; Yano, Tomotaka

    A new electromagnetically actuated vacuum circuit breaker (VCB) has been designed and developed on the basis of the transient electromagnetic analysis coupled with motion. The VCB has three advanced bi-stable electromagnetic actuators, which control each phase independently. The VCB serves as a synchronous circuit breaker as well as a standard circuit breaker. In this work, the flux delay due to the eddy current is analytically formulated using the delay time constant of the actuator coil current, thereby leading to accurate driving behavior. With this analytical method, the electromagnetic mechanism for a 24kV rated VCB has been optimized; and as a result, the driving energy is reduced to one fifth of that of a conventional VCB employing spring mechanism, and the number of parts is significantly decreased. Therefore, the developed VCB becomes compact, highly reliable and highly durable.

  11. Technical Trend of Environment-friendly High Voltage Vacuum Circuit Breaker (VCB)

    NASA Astrophysics Data System (ADS)

    Okubo, Hitoshi

    Vacuum Circuit Breakers (VCBs) have widely been used for low and medium voltage level, because of their high current interruption performance, maintenance free operations and environment-friendly characteristics. The VCB is now going to be applied to higher voltage systems for transmission and substation use. In this paper, the recent technical trend and future perspectives of high voltage VCBs are described, as well as their technical background.

  12. DC Interruption Characteristic on Vacuum Circuit Breaker

    NASA Astrophysics Data System (ADS)

    Odaka, Hiromi; Yamada, Masataka; Sakuma, Ryohei; Ding, Cuie; Kaneko, Eiji; Yanabu, Satoru

    A high speed vacuum circuit breaker (HSVCB) has been investigated. HSVCB makes high frequency current superimposed on a fault current so that the current is forced to be zero and is interrupted. Its interruption performance is considered to be dependent on a rate of change of the current (di/dt). As a fundamental research, we investigated the di/dt-dv/dt characteristics and the insulation recovery characteristic after interrupting the counter-pulse current for various contact materials of AgWC, CuW, and CuCr. The results revealed that the case where gap length is larger is better in a current interruption performance. Moreover, it was found that di/dt is not dependent on the insulation recovery characteristics, but the magnitude of interruption current influences greatly.

  13. Present Status of Power Circuit Breaker and its Future

    NASA Astrophysics Data System (ADS)

    Yoshioka, Yoshio

    Gas circuit breaker and vacuum circuit breaker are the 2 main types of circuit breaker used in extra high voltage and medium voltage networks. After reviewing the history of these circuit breakers, their present status and technologies are described. As for future technology, computation of interrupting phenomena, SF6 gas less apparatus and expectation of the high voltage vacuum circuit breaker are discussed.

  14. Influence of the axial magnetic field on sheath development after current zero in a vacuum circuit breaker

    NASA Astrophysics Data System (ADS)

    Chen, Yi; Yang, Fei; Sun, Hao; Wu, Yi; Niu, Chunping; Rong, Mingzhe

    2017-06-01

    After current zero, which is the moment when the vacuum circuit breaker interrupts a vacuum arc, sheath development is the first process in the dielectric recovery process. An axial magnetic field (AMF) is widely used in the vacuum circuit breaker when the high-current vacuum arc is interrupted. Therefore, it is very important to study the influence of different AMF amplitudes on the sheath development. The objective of this paper is to study the influence of different AMF amplitudes on the sheath development from a micro perspective. Thus, the particle in cell-Monte Carlo collisions (PIC-MCC) method was adopted to develop the sheath development model. We compared the simulation results with the experimental results and then validated the simulation. We also obtained the speed of the sheath development and the energy density of the ions under different AMF amplitudes. The results showed that the larger the AMF amplitudes are, the faster the sheath develops and the lower the ion energy density is, meaning the breakdown is correspondingly more difficult.

  15. Measuring technical and mathematical investigation of multiple reignitions at the switching of a motor using vacuum circuit breakers

    NASA Astrophysics Data System (ADS)

    Luxa, Andreas

    The necessary conditions in switching system and vacuum circuit breaker for the occurrence of multiple re-ignitions and accompanying effects were examined. The shape of the occurring voltages was determined in relationship to other types of overvoltage. A phenomenological model of the arc, based on an extension of the Mayr equation for arcs was used with the simulation program NETOMAC for the switching transients. Factors which affect the arc parameters were analyzed. The results were statistically verified by 3000 three-phase switching tests on 3 standard vacuum circuit breakers under realistic systems conditions; the occurring overvoltage level was measured. Dimensioning criteria for motor simulation circuits in power plants were formulated on the basis of a theoretical equivalence analysis and experimental studies. The simulation model allows a sufficiently correct estimation of all effects.

  16. High temperature circuit breaker

    NASA Technical Reports Server (NTRS)

    Edwards, R. N.; Travis, E. F.

    1970-01-01

    Alternating current circuit breaker is suitable for reliable long-term service at 1000 deg F in the vacuum conditions of outer space. Construction materials are resistant to nuclear radiation and vacuum welding. Service test conditions and results are given.

  17. Development of 72kV High Pressure Air-insulated GIS with Vacuum Circuit Breaker

    NASA Astrophysics Data System (ADS)

    Rokunohe, Toshiaki; Yagihashi, Yoshitaka; Endo, Fumihiro; Aoyagi, Kenji; Saitoh, Hitoshi; Oomori, Takashi

    SF6 gas has excellent dielectric strength and interruption performance. For these reasons, it has been widely used for gas insulated switchgear (GIS). However, use of SF6 gas has become regulated under agreements set at the 1997 COP3. So investigation and development for GIS with a lower amount of SF6 gas are being carried out worldwide. Presently, SF6 gas-free GIS has been commercialized for the 24kV class. Air or N2 gas is used as insulation gas for this GIS. On the other hand, SF6 gas-free GIS has not been commercialized for 72kV class GIS. Dielectric strengths of air and N2 gas are approximately 1/3 that of SF6 gas. So to enhance insulation performance of air and N2, we have investigated a hybrid gas insulation system which has the combined features of providing an insulation coating and suitable insulation gas. We have developed the world's first 72kV SF6 gas-free GIS. This paper deals with key technologies for SF6 gas-free GIS such as the hybrid insulation structure, bellows for the high pressure vacuum circuit breaker, a newly designed disconnector and spacer and prevention of particle levitation. Test results of 72kV high pressure air-insulated GIS with the vacuum circuit breaker are described.

  18. Development of a High-speed Electromagnetic Repulsion Mechanism for High-voltage Vacuum Circuit Breakers

    NASA Astrophysics Data System (ADS)

    Tsukima, Mitsuru; Takeuchi, Toshie; Koyama, Kenichi; Yoshiyasu, Hajimu

    This paper presents a design and testing of a new high-speed electromagnetic driving mechanism for a high-voltage vacuum circuit breaker (VCB). This mechanism is based on a high-speed electromagnetic repulsion and a permanent magnet spring (PMS). This PMS is introduced instead of the conventional disk spring due to its low spring energy and more suitable force characteristics for VCB application. The PMS has been optimally designed by the 3d non-linear finite-elements magnetic field analysis and investigated its internal friction and eddy-current effect. Furthermore, we calculated the dynamic of this mechanism coupling with the electromagnetic field and circuit analysis, in order to satisfy the operating characteristics—contact velocity, response time and so on, required for the high-speed VCB. A prototype VCB, which was built based on the above analysis shows sufficient operating performance. Finally, the short circuit interruption tests were carried out with this prototype breaker, and we have been able to verify its satisfying performance.

  19. Interruption of a dry-type transformer in no-load by a vacuum circuit-breaker

    NASA Astrophysics Data System (ADS)

    Vandenheuvel, W. M. C.; Daalder, J. E.; Boone, M. J. M.; Wilmes, L. A. H.

    1983-08-01

    Overvoltages generated during interruption of a dry type delta-star connected transformer in no load by a vacuum breaker were studied. During interruption of inrush current 37% of the phase-to-ground overvoltages were 5 pu, and 6% 7 pu. Comparison of experimental and theoretical results using Boyle's model shows no discrepancy for inrush currents and clean overvoltages from the steady-state interruption. Overvoltages due to repetitive reignitions (not covered by Boyle's model) are higher than the calculated values during steady-state switching.

  20. Sheath expansion and plasma dynamics in the presence of electrode evaporation: Application to a vacuum circuit breaker

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sarrailh, P.; LAPLACE, CNRS, F-31062 Toulouse; Schneider Electric, Centre de Recherche 38 TEC, 38050 Grenoble Cedex 09

    2009-09-01

    During the postarc dielectric recovery phase in a vacuum circuit breaker, a cathode sheath forms and expels the plasma from the electrode gap. The success or failure of current breaking depends on how efficiently the plasma is expelled from the electrode gap. The sheath expansion in the postarc phase can be compared to sheath expansion in plasma immersion ion implantation except that collisions between charged particles and atoms generated by electrode evaporation may become important in a vacuum circuit breaker. In this paper, we show that electrode evaporation plays a significant role in the dynamics of the sheath expansion inmore » this context not only because charged particle transport is no longer collisionless but also because the neutral flow due to evaporation and temperature gradients may push the plasma toward one of the electrodes. Using a hybrid model of the nonequilibrium postarc plasma and cathode sheath coupled with a direct simulation Monte Carlo method to describe collisions between heavy species, we present a parametric study of the sheath and plasma dynamics and of the time needed for the sheath to expel the plasma from the gap for different values of plasma density and electrode temperatures at the beginning of the postarc phase. This work constitutes a preliminary step toward understanding and quantifying the risk of current breaking failure of a vacuum arc.« less

  1. Sheath expansion and plasma dynamics in the presence of electrode evaporation: Application to a vacuum circuit breaker

    NASA Astrophysics Data System (ADS)

    Sarrailh, P.; Garrigues, L.; Hagelaar, G. J. M.; Boeuf, J. P.; Sandolache, G.; Rowe, S.

    2009-09-01

    During the postarc dielectric recovery phase in a vacuum circuit breaker, a cathode sheath forms and expels the plasma from the electrode gap. The success or failure of current breaking depends on how efficiently the plasma is expelled from the electrode gap. The sheath expansion in the postarc phase can be compared to sheath expansion in plasma immersion ion implantation except that collisions between charged particles and atoms generated by electrode evaporation may become important in a vacuum circuit breaker. In this paper, we show that electrode evaporation plays a significant role in the dynamics of the sheath expansion in this context not only because charged particle transport is no longer collisionless but also because the neutral flow due to evaporation and temperature gradients may push the plasma toward one of the electrodes. Using a hybrid model of the nonequilibrium postarc plasma and cathode sheath coupled with a direct simulation Monte Carlo method to describe collisions between heavy species, we present a parametric study of the sheath and plasma dynamics and of the time needed for the sheath to expel the plasma from the gap for different values of plasma density and electrode temperatures at the beginning of the postarc phase. This work constitutes a preliminary step toward understanding and quantifying the risk of current breaking failure of a vacuum arc.

  2. Direct current hybrid breakers: A design and its realization

    NASA Astrophysics Data System (ADS)

    Atmadji, Ali Mahfudz Surya

    2000-12-01

    The use of semiconductors for electric power circuit breakers instead of conventional breakers remains a utopia when designing fault current interrupters for high power networks. The major problems concerning power semiconductor circuit breakers are the excessive heat losses and their sensitivity to transients. However, conventional breakers are capable of dealing with such matters. A combination of the two methods, or so-called `hybrid breakers', would appear to be a solution; however, hybrid breakers use separate parallel branches for conducting the main current and interrupting the short-circuit current. Such breakers are intended for protecting direct current (DC) traction systems. In this thesis hybrid switching techniques for current limitation and purely solidstate current interruption are investigated for DC breakers. This work analyzes the transient behavior of hybrid breakers and compares their operations with conventional breakers and similar solid-state devices in DC systems. Therefore a hybrid breaker was constructed and tested in a specially designed high power test circuit. A vacuum breaker was chosen as the main breaker in the main conducting path; then a commutation path was connected across the vacuum breaker where it provided current limitation and interruption. The commutation path operated only during any current interruption and the process required additional circuits. These included a certain energy storage, overvoltage suppressor and commutation switch. So that when discharging this energy, a controlled counter-current injection could be produced. That counter-current opposed the main current in the breaker by superposition in order to create a forced current-zero. One-stage and two-stage commutation circuits have been treated extensively. This study project contains both theoretical and experimental investigations. A direct current shortcircuit source was constructed capable of delivering power equivalent to a fault. It supplied a direct

  3. Post-arc current simulation based on measurement in vacuum circuit breaker with a one-dimensional particle-in-cell model

    NASA Astrophysics Data System (ADS)

    Jia, Shenli; Mo, Yongpeng; Shi, Zongqian; Li, Junliang; Wang, Lijun

    2017-10-01

    The post-arc dielectric recovery process has a decisive effect on the current interruption performance in a vacuum circuit breaker. The dissipation of residual plasma at the moment of current zero under the transient recovery voltage, which is the first stage of the post-arc dielectric recovery process and forms the post-arc current, has attracted many concerns. A one-dimensional particle-in-cell model is developed to simulate the measured post-arc current in the vacuum circuit breaker in this paper. At first, the parameters of the residual plasma are estimated roughly by the waveform of the post-arc current which is taken from measurements. After that, different components of the post-arc current, which are formed by the movement of charged particles in the residual plasma, are discussed. Then, the residual plasma density is adjusted according to the proportion of electrons and ions absorbed by the post-arc anode derived from the particle-in-cell simulation. After this adjustment, the post-arc current waveform obtained from the simulation is closer to that obtained from measurements.

  4. History of Circuit Breakers and Expectations of Japanese Original Development

    NASA Astrophysics Data System (ADS)

    Yoshioka, Yoshio; Yoshinaga, Kiyoshi; Yanabu, Satoru

    This paper studies the history of high voltage circuit breaker engineering. Methods of analysis are (1) to collect facts in regard to its development, (2) to review the history in order to find essential factors and (3) to identify its pros and cons from engineering point of view. The amount of electric power consumption has increased and gradually the circuit breaker concept was developed. At first the oil circuit breakers were developed in Europe and the air circuit breaker and vacuum circuit breaker were developed. Finally the SF6gas circuit breakers are developed together with the gas insulated switchgear and what is next? The future research and development policy is also discussed.

  5. Development of Electromagnetically Actuated Vacuum Circuit Breaker for 72kV Rated Switchgear

    NASA Astrophysics Data System (ADS)

    Kim, Tae-Hyun; Tsukima, Mitsuru; Maruyama, Akihiko; Takahara, Osamu; Haruna, Kazushi; Yano, Tomotaka; Matsunaga, Toshihiro; Imamura, Kazuaki; Arioka, Masahiro; Takeuchi, Toshie

    A new electromagnetically actuated vacuum circuit breaker (VCB) has been developed for a 72kV rated switchgear. Each phase of this VCB has a plurality of compact electromagnetic actuators linked mechanically providing the required driving energy. The mechanical linkage working as a lever magnifies an actuator stroke to the required stroke of a 72kV rated vacuum interrupter. An electromagnetic analysis coupled with motion, which considers the mechanical linkage of the plural actuators, has been developed for designing the driving behavior of this VCB. Using this analytical method and a quality engineering method known as the Taguchi method, we have clarified effective parameters to reduce the time difference of the driving behavior for tolerance specifications. Moreover, analyzing the oscillatory behavior closing the contacts, a structure of this VCB has been designed to reduce the bounce duration. The developed new VCB has been confirmed that a time difference is short enough and bounce duration is reduced. This VCB is highly reliable against variations in manufacturing and environment.

  6. Influence of residual plasma drift velocity on the post-arc sheath expansion of vacuum circuit breakers

    NASA Astrophysics Data System (ADS)

    Mo, Yongpeng; Shi, Zongqian; Bai, Zhibin; Jia, Shenli; Wang, Lijun

    2016-05-01

    The residual plasma in the inter-contact region of a vacuum circuit breaker moves towards the post-arc cathode at current zero, because the residual plasma mainly comes from the cathode spots during the arc burning process. In the most previous theoretical researches on the post-arc sheath expansion process of vacuum circuit breakers, only the thermal motion of residual plasma was taken into consideration. Alternately, the residual plasma was even assumed to be static at the moment of current zero in some simplified models. However, the influence of residual plasma drift velocity at current zero on the post-arc sheath expansion process was rarely investigated. In this paper, this effect is investigated by a one-dimensional particle-in-cell model. Simulation results indicate that the sheath expands slower with higher residual plasma drift velocity in the initial sheath expansion stage. However, with the increase of residual plasma drift velocity, the overall plasma density in the inter-contact region decreases faster, and the sheath expansion velocity increases earlier. Consequently, as a whole, it needs shorter time to expel the residual plasma from the inter-contact region. Furthermore, if the residual plasma drift velocity is high enough, the sheath expansion process ceases before it develops to the post-arc anode. Besides, the influence of the collisions between charges and neutrals is investigated as well in terms of the density of metal vapor. It shows that the residual plasma drift velocity takes remarkable effect only if the density of the metal vapor is relatively low, which corresponds to the circumstance of low-current interruptions.

  7. 133. View of former oil switch breaker room (on second ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    133. View of former oil switch breaker room (on second floor, north of the control room), looking south. The oil switch breakers were replaced with vacuum switches, along the wall to the right. Photo by Jet Lowe, HAER, 1989. - Puget Sound Power & Light Company, White River Hydroelectric Project, 600 North River Avenue, Dieringer, Pierce County, WA

  8. Influence of Gap Distance on Vacuum Arc Characteristics of Cup Type AMF Electrode in Vacuum Interrupters

    NASA Astrophysics Data System (ADS)

    Cheng, Shaoyong; Xiu, Shixin; Wang, Jimei; Shen, Zhengchao

    2006-11-01

    The greenhouse effect of SF6 is a great concern today. The development of high voltage vacuum circuit breakers becomes more important. The vacuum circuit breaker has minimum pollution to the environment. The vacuum interrupter is the key part of a vacuum circuit breaker. The interrupting characteristics in vacuum and arc-controlling technique are the main problems to be solved for a longer gap distance in developing high voltage vacuum interrupters. To understand the vacuum arc characteristics and provide effective technique to control vacuum arc in a long gap distance, the arc mode transition of a cup-type axial magnetic field electrode is observed by a high-speed charge coupled device (CCD) video camera under different gap distances while the arc voltage and arc current are recorded. The controlling ability of the axial magnetic field on vacuum arc obviously decreases when the gap distance is longer than 40 mm. The noise components and mean value of the arc voltage significantly increase. The effective method for controlling the vacuum arc characteristics is provided by long gap distances based on the test results. The test results can be used as a reference to develop high voltage and large capacity vacuum interrupters.

  9. Influence of residual plasma drift velocity on the post-arc sheath expansion of vacuum circuit breakers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mo, Yongpeng; Shi, Zongqian; Jia, Shenli

    The residual plasma in the inter-contact region of a vacuum circuit breaker moves towards the post-arc cathode at current zero, because the residual plasma mainly comes from the cathode spots during the arc burning process. In the most previous theoretical researches on the post-arc sheath expansion process of vacuum circuit breakers, only the thermal motion of residual plasma was taken into consideration. Alternately, the residual plasma was even assumed to be static at the moment of current zero in some simplified models. However, the influence of residual plasma drift velocity at current zero on the post-arc sheath expansion process wasmore » rarely investigated. In this paper, this effect is investigated by a one-dimensional particle-in-cell model. Simulation results indicate that the sheath expands slower with higher residual plasma drift velocity in the initial sheath expansion stage. However, with the increase of residual plasma drift velocity, the overall plasma density in the inter-contact region decreases faster, and the sheath expansion velocity increases earlier. Consequently, as a whole, it needs shorter time to expel the residual plasma from the inter-contact region. Furthermore, if the residual plasma drift velocity is high enough, the sheath expansion process ceases before it develops to the post-arc anode. Besides, the influence of the collisions between charges and neutrals is investigated as well in terms of the density of metal vapor. It shows that the residual plasma drift velocity takes remarkable effect only if the density of the metal vapor is relatively low, which corresponds to the circumstance of low-current interruptions.« less

  10. A New Method for Raising Opening Velocity of Electromagnetic Actuated Vacuum Circuit Breaker

    NASA Astrophysics Data System (ADS)

    Tsukima, Mitsuru; Takeuchi, Toshie; Koyama, Kenichi; Yoshiyasu, Hajimu

    Recently an electromagnetic actuator has been widely used as an operating mechanism for the vacuum circuit breaker (VCB). The opening velocity of the contact is supposed to be strongly related with current interruption performance. This paper presents a simple and new technique that raises opening velocity of the electromagnetic actuated VCB. In order to investigate this reason, we built a numerical simulator that predicts the dynamic characteristics of the VCB contact. It takes into account of the magnetic behavior in the actuator and is also coupled with the external control circuit. According to this simulation, it is shown that it is originated from the sharp rise in the electromagnetic thrust force due to the selective saturation of the magnetic yoke. As the result of our experiments, by this technique the opening velocity was verified to be 1.5 times faster than by the conventional way.

  11. Electric circuit breaker comprising a plurality of vacuum interrupters simultaneously operated by a common operator

    DOEpatents

    Barkan, Philip; Imam, Imdad

    1980-01-01

    This circuit breaker comprises a plurality of a vacuum-type circuit interrupters, each having a movable contact rod. A common operating device for the interrupters comprises a linearly-movable operating member. The interrupters are mounted at one side of the operating member with their movable contact rods extending in a direction generally toward the operating member. Means is provided for mechanically coupling the operating member to the contact rods, and this means comprises a plurality of insulating operating rods, each connected at one end to the operating member and at its opposite end to one of the movable contact rods. The operating rods are of substantially equal length and have longitudinal axes that converge and intersect at substantially a common point.

  12. Development of the Vacuum Circuit Breaker with an Electromagnetic Actuator

    NASA Astrophysics Data System (ADS)

    Morita, Ayumu; Yabu, Masato; Kajiwara, Satoru

    A new type of vacuum circuit breaker (VCB) has been developed, which needs a minimum of maintenance. This VCB is characterized by the following: (a) a significantly simplified driving mechanism, (b) no need for grease, and (c) a new electromagnetic actuator called a hybrid-type electromagnet. The number of movable parts is decreased to 15% of that of our conventional product with a spring drive. Solid lubricant is adopted instead of grease for almost all of the linkages, which helps to eliminate periodical lubricating maintenance. The hybrid-type electromagnet has an attractive force suitable for the spring force characteristics of the VCB through its combination of conventional plunger-type and plate-armature-type electromagnet. The VCB is held in the closed position by the attractive force of the permanent magnet without using a coil current. Its core structure is optimized to prevent the permanent magnet from demagnetization and to secure long-term reliability. To assess the solid lubricant reliability, some special tests were performed such as a rare operation test. Dynamic characteristics were measured for three specimens at intervals of a month, a year, and two years, respectively. It was confirmed that variation of the armature speed is small and the influence of the non-operation interval is negligible.

  13. Investigation of Dielectric Breakdown Characteristics for Double-break Vacuum Interrupter and Dielectric Breakdown Probability Distribution in Vacuum Interrupter

    NASA Astrophysics Data System (ADS)

    Shioiri, Tetsu; Asari, Naoki; Sato, Junichi; Sasage, Kosuke; Yokokura, Kunio; Homma, Mitsutaka; Suzuki, Katsumi

    To investigate the reliability of equipment of vacuum insulation, a study was carried out to clarify breakdown probability distributions in vacuum gap. Further, a double-break vacuum circuit breaker was investigated for breakdown probability distribution. The test results show that the breakdown probability distribution of the vacuum gap can be represented by a Weibull distribution using a location parameter, which shows the voltage that permits a zero breakdown probability. The location parameter obtained from Weibull plot depends on electrode area. The shape parameter obtained from Weibull plot of vacuum gap was 10∼14, and is constant irrespective non-uniform field factor. The breakdown probability distribution after no-load switching can be represented by Weibull distribution using a location parameter. The shape parameter after no-load switching was 6∼8.5, and is constant, irrespective of gap length. This indicates that the scatter of breakdown voltage was increased by no-load switching. If the vacuum circuit breaker uses a double break, breakdown probability at low voltage becomes lower than single-break probability. Although potential distribution is a concern in the double-break vacuum cuicuit breaker, its insulation reliability is better than that of the single-break vacuum interrupter even if the bias of the vacuum interrupter's sharing voltage is taken into account.

  14. Modeling of breakdown during the post-arc phase of a vacuum circuit breaker

    NASA Astrophysics Data System (ADS)

    Sarrailh, P.; Garrigues, L.; Boeuf, J. P.; Hagelaar, G. J. M.

    2010-12-01

    After a high-current interruption in a vacuum circuit breaker (VCB), the electrode gap is filled with a high density copper vapor plasma in a large copper vapor density (~1022 m-3). The copper vapor density is sustained by electrode evaporation. During the post-arc phase, a rapidly increasing voltage is applied to the gap, and a sheath forms and expands, expelling the plasma from the gap when circuit breaking is successful. There is, however, a risk of breakdown during that phase, leading to the failure of the VCB. Preventing breakdown during the post-arc phase is an important issue for the improvement of VCB reliability. In this paper, we analyze the risk of Townsend breakdown in the high copper vapor density during the post-arc phase using a numerical model that takes into account secondary electron emission, volume ionization, and plasma and neutral transport, for given electrode temperatures. The simulations show that fast neutrals created in the cathode sheath by charge exchange collisions with ions generate a very large secondary electron emission current that can lead to Townsend breakdown. The results also show that the risk of failure of the VCB due to Townsend breakdown strongly depends on the electrode temperatures (which govern the copper vapor density) and becomes important for temperatures greater than 2100 K, which can be reached in vacuum arcs. The simulations also predict that a hotter anode tends to increase the risk of Townsend breakdown.

  15. Structure design of and experimental research on a two-stage laval foam breaker for foam fluid recycling.

    PubMed

    Wang, Jin-song; Cao, Pin-lu; Yin, Kun

    2015-07-01

    Environmental, economical and efficient antifoaming technology is the basis for achievement of foam drilling fluid recycling. The present study designed a novel two-stage laval mechanical foam breaker that primarily uses vacuum generated by Coanda effect and Laval principle to break foam. Numerical simulation results showed that the value and distribution of negative pressure of two-stage laval foam breaker were larger than that of the normal foam breaker. Experimental results showed that foam-breaking efficiency of two-stage laval foam breaker was higher than that of normal foam breaker, when gas-to-liquid ratio and liquid flow rate changed. The foam-breaking efficiency of normal foam breaker decreased rapidly with increasing foam stability, whereas the two-stage laval foam breaker remained unchanged. Foam base fluid would be recycled using two-stage laval foam breaker, which would reduce the foam drilling cost sharply and waste disposals that adverse by affect the environment.

  16. Cathode surface effects and H.F.-behaviour of vacuum arcs

    NASA Astrophysics Data System (ADS)

    Fu, Yan Hong

    To gain a better understanding of the essential processes occurring during a vacuum arc interruption for the further development of the vacuum arc circuit breaker, cathode spot behavior, current interruption, dielectrical recovery and overvoltage generation are investigated. An experimental study on cathode spot behavior of the DC vacuum arc in relation to cathode surface roughness and a qualitative physical model to interpret the results are reported. An experimental investigation on the High Frequency (HF) current interruption, multiple recognitions and voltage escalation phenomena is reported. A calculation program to predict the level of overvoltages generated by the operation of a vacuum breaker in a realistic single phase circuit is developed. Detailed results are summarized.

  17. Digital model of a vacuum circuit breaker for the analysis of switching waveforms in electrical circuits

    NASA Astrophysics Data System (ADS)

    Budzisz, Joanna; Wróblewski, Zbigniew

    2016-03-01

    The article presents a method of modelling a vaccum circuit breaker in the ATP/EMTP package, the results of the verification of the correctness of the developed digital circuit breaker model operation and its practical usefulness for analysis of overvoltages and overcurrents occurring in commutated capacitive electrical circuits and also examples of digital simulations of overvoltages and overcurrents in selected electrical circuits.

  18. Moving characteristics of electrodes for vacuum circuit breaker

    NASA Astrophysics Data System (ADS)

    Yuan, Shun; Wang, Jimei

    1994-05-01

    This paper analyzes the effect of the gap of electrodes on the state of vacuum arc by experiment and theory. And the model of vacuum arc is set up. The optimal gap can be deduced from controlling the vacuum arc to be diffusion state, in order to get the optimal moving characteristics of electrodes.

  19. Hydraulic actuator for an electric circuit breaker

    DOEpatents

    Imam, I.

    1983-05-17

    This actuator comprises a fluid motor having a piston, a breaker-opening space at one side of the piston, and a breaker-closing space at its opposite side. An accumulator freely communicates with the breaker-opening space for supplying pressurized fluid thereto during a circuit breaker opening operation. The breaker-opening space and the breaker-closing space are connected by an impeded flow passage. A pilot valve opens to allow the pressurized liquid in the breaker-closing space to flow to a back chamber of a normally closed main valve to cause the main valve to be opened during a circuit breaker opening operation to release the pressurized liquid from the breaker-closing space. An impeded passage affords communication between the back chamber and a sump located on the opposite side of the main valve from the back chamber. The pilot valve and impeded passage allow rapid opening of the main valve with pressurized liquid from the breaker closing side of the piston. 3 figs.

  20. Hydraulic actuator for an electric circuit breaker

    DOEpatents

    Imam, Imdad [Colonie, NY

    1983-01-01

    This actuator comprises a fluid motor having a piston, a breaker-opening space at one side of the piston, and a breaker-closing space at its opposite side. An accumulator freely communicates with the breaker-opening space for supplying pressurized fluid thereto during a circuit breaker opening operation. The breaker-opening space and the breaker-closing space are connected by an impeded flow passage. A pilot valve opens to allow the pressurized liquid in the breaker-closing space to flow to a back chamber of a normally closed main valve to cause the main valve to be opened during a circuit breaker opening operation to release the pressurized liquid from the breaker-closing space. An impeded passage affords communication between the back chamber and a sump located on the opposite side of the main valve from the back chamber. The pilot valve and impeded passage allow rapid opening of the main valve with pressurized liquid from the breaker closing side of the piston.

  1. 46 CFR 39.2011 - Vapor overpressure and vacuum protection-TB/ALL.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... freely and does not remain in the open position. (c) A liquid filled pressure-vacuum breaker may be used... 46 Shipping 1 2014-10-01 2014-10-01 false Vapor overpressure and vacuum protection-TB/ALL. 39.2011... Equipment and Installation § 39.2011 Vapor overpressure and vacuum protection—TB/ALL. (a) The cargo tank...

  2. 46 CFR 39.2011 - Vapor overpressure and vacuum protection-TB/ALL.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... freely and does not remain in the open position. (c) A liquid filled pressure-vacuum breaker may be used... 46 Shipping 1 2013-10-01 2013-10-01 false Vapor overpressure and vacuum protection-TB/ALL. 39.2011... Equipment and Installation § 39.2011 Vapor overpressure and vacuum protection—TB/ALL. (a) The cargo tank...

  3. Low Insertion HVDC Circuit Breaker: Magnetically Pulsed Hybrid Breaker for HVDC Power Distribution Protection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    None

    2012-01-09

    GENI Project: General Atomics is developing a direct current (DC) circuit breaker that could protect the grid from faults 100 times faster than its alternating current (AC) counterparts. Circuit breakers are critical elements in any electrical system. At the grid level, their main function is to isolate parts of the grid where a fault has occurred—such as a downed power line or a transformer explosion—from the rest of the system. DC circuit breakers must interrupt the system during a fault much faster than AC circuit breakers to prevent possible damage to cables, converters and other grid-level components. General Atomics’ high-voltagemore » DC circuit breaker would react in less than 1/1,000th of a second to interrupt current during a fault, preventing potential hazards to people and equipment.« less

  4. Numerical modeling of high-voltage circuit breaker arcs and their interraction with the power system

    NASA Astrophysics Data System (ADS)

    Orama, Lionel R.

    In this work the interaction between series connected gas and vacuum circuit breaker arcs has been studied. The breakdown phenomena in vacuum interrupters during the post arc current period have been of special interest. Numerical models of gas and vacuum arcs were developed in the form of black box models. Especially, the vacuum post arc model was implemented by combining the existing transition model with an ion density function and expressions for the breakdown mechanisms. The test series studied reflect that for electric fields on the order of 10sp7V/m over the anode, the breakdown of the vacuum gap can result from a combination of both thermal and electrical stresses. For a particular vacuum device, the vacuum model helps to find the interruption limits of the electric field and power density over the anode. The series connection of gas and vacuum interrupters always performs better than the single gas device. Moreover, to take advantage of the good characteristics of both devices, the time between the current zero crossing in each interrupter can be changed. This current zero synchronization is controlled by changing the capacitance in parallel to the gas device. This gas/vacuum interrupter is suitable for interruption of very stressful short circuits in which the product of the dI/dt before current zero and the dV/dt after current zero is very high. Also, a single SF6 interrupter can be replaced by an air circuit breaker of the same voltage rating in series with a vacuum device without compromising the good performance of the SF6 device. Conceptually, a series connected vacuum device can be used for high voltage applications with equal distribution of electrical stresses between the individual interrupters. The equalization can be made by a sequential opening of the individual contact pairs, beginning with the interruptors that are closer to ground potential. This could eliminate the use of grading capacitors.

  5. Rectifier cabinet static breaker

    DOEpatents

    Costantino, Jr, Roger A.; Gliebe, Ronald J.

    1992-09-01

    A rectifier cabinet static breaker replaces a blocking diode pair with an SCR and the installation of a power transistor in parallel with the latch contactor to commutate the SCR to the off state. The SCR serves as a static breaker with fast turnoff capability providing an alternative way of achieving reactor scram in addition to performing the function of the replaced blocking diodes. The control circuitry for the rectifier cabinet static breaker includes on-line test capability and an LED indicator light to denote successful test completion. Current limit circuitry provides high-speed protection in the event of overload.

  6. 46 CFR 169.670 - Circuit breakers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Gross Tons § 169.670 Circuit breakers. Each circuit breaker must be of the manually reset type designed for— (a) Inverse time delay; (b) Instantaneous short circuit protection; and (c) Repeated opening of... 46 Shipping 7 2010-10-01 2010-10-01 false Circuit breakers. 169.670 Section 169.670 Shipping COAST...

  7. Commutation circuit for an HVDC circuit breaker

    DOEpatents

    Premerlani, William J.

    1981-01-01

    A commutation circuit for a high voltage DC circuit breaker incorporates a resistor capacitor combination and a charging circuit connected to the main breaker, such that a commutating capacitor is discharged in opposition to the load current to force the current in an arc after breaker opening to zero to facilitate arc interruption. In a particular embodiment, a normally open commutating circuit is connected across the contacts of a main DC circuit breaker to absorb the inductive system energy trapped by breaker opening and to limit recovery voltages to a level tolerable by the commutating circuit components.

  8. Commutation circuit for an HVDC circuit breaker

    DOEpatents

    Premerlani, W.J.

    1981-11-10

    A commutation circuit for a high voltage DC circuit breaker incorporates a resistor capacitor combination and a charging circuit connected to the main breaker, such that a commutating capacitor is discharged in opposition to the load current to force the current in an arc after breaker opening to zero to facilitate arc interruption. In a particular embodiment, a normally open commutating circuit is connected across the contacts of a main DC circuit breaker to absorb the inductive system energy trapped by breaker opening and to limit recovery voltages to a level tolerable by the commutating circuit components. 13 figs.

  9. Hydraulically-activated operating system for an electric circuit breaker

    DOEpatents

    Imam, Imdad; Barkan, Philip

    1979-01-01

    This operating system comprises a fluid motor having a piston, a breaker-opening space at one side of the piston, and a breaker-closing space at its opposite side. An accumulator freely communicates with the breaker-opening space for supplying pressurized fluid thereto during a circuit-breaker opening operation. A normally-closed valve located on the breaker-closing-side of the piston is openable to release liquid from the breaker-closing space so that pressurized liquid in the breaker-opening space can drive the piston in an opening direction. Means is provided for restoring the valve to its closed position following the circuit-breaker opening operation. An impeded passage affords communication between the accumulator and the breaker-closing space to allow pressurized liquid to flow from the accumulator to the breaker-closing space and develop a pressure therein substantially equal to accumulator pressure when the valve is restored to closed position following breaker-opening. This passage is so impeded that the flow therethrough from the accumulator into the breaker-closing space is sufficiently low during initial opening motion of the piston through a substantial portion of its opening stroke as to avoid interference with said initial opening motion of the piston.

  10. High Speed Solid State Circuit Breaker

    NASA Technical Reports Server (NTRS)

    Podlesak, Thomas F.

    1993-01-01

    The U.S. Army Research Laboratory, Fort Monmouth, NJ, has developed and is installing two 3.3 MW high speed solid state circuit breakers at the Army's Pulse Power Center. These circuit breakers will interrupt 4160V three phase power mains in no more than 300 microseconds, two orders of magnitude faster than conventional mechanical contact type circuit breakers. These circuit breakers utilize Gate Turnoff Thyristors (GTO's) and are currently utility type devices using air cooling in an air conditioned enclosure. Future refinements include liquid cooling, either water or two phase organic coolant, and more advanced semiconductors. Each of these refinements promises a more compact, more reliable unit.

  11. Breakdown Conditioning Chacteristics of Precision-Surface-Treatment-Electrode in Vacuum

    NASA Astrophysics Data System (ADS)

    Kato, Kastumi; Fukuoka, Yuji; Inagawa, Yukihiko; Saitoh, Hitoshi; Sakaki, Masayuki; Okubo, Hitoshi

    Breakdown (BD) characteristics in vacuum are strongly dependent on the electrode surface condition, like the surface roughness etc. Therefore, in order to develop a high voltage vacuum circuit breaker, it is important to optimize the surface treatment process. This paper discusses about the effect of precision-surface-treatment of the electrode on breakdown conditioning characteristics under non-uniform electric field in vacuum. Experimental results reveal that the electrode surface treatment affects the conditioning process, especially the BD voltage and the BD field strength at the initial stage of the conditioning.

  12. Vacuum Head Checks Foam/Substrate Bonds

    NASA Technical Reports Server (NTRS)

    Lloyd, James F.

    1989-01-01

    Electromechanical inspection system quickly gives measurements indicating adhesion, or lack thereof, between rigid polyurethane foam and aluminum substrate. Does not damage inspected article, easy to operate, and used to perform "go/no-go" evaluations or as supplement to conventional destructive pull-plug testing. Applies vacuum to small area of foam panel and measures distance through which foam pulled into vacuum. Probe head applied to specimen and evacuated through hose to controller/monitor unit. Digital voltmeter in unit reads deflection of LVDT probe head.

  13. Circuit breaker lockout device

    DOEpatents

    Kozlowski, Lawrence J.; Shirey, Lawrence A.

    1992-01-01

    An improved lockout assembly for locking a circuit breaker in a selected off or on position is provided. The lockout assembly includes a lock block and a lock pin. The lock block has a hollow interior which fits over the free end of a switch handle of the circuit breaker. The lock block includes at least one hole that is placed in registration with a hole in the free end of the switch handle. A lock tab on the lock block serves to align and register the respective holes on the lock block and switch handle. A lock pin is inserted through the registered holes and serves to connect the lock block to the switch handle. Once the lock block and the switch handle are connected, the position of the switch handle is prevented from being changed by the lock tab bumping up against a stationary housing portion of the circuit breaker. When the lock pin installed, an apertured-end portion of the lock pin is in registration with another hole on the lock block. Then a special scissors conforming to O.S.H.A. regulations can be installed, with one or more padlocks, on the lockout assembly to prevent removal of the lock pin from the lockout assembly, thereby preventing removal of the lockout assembly from the circuit breaker.

  14. Circuit breaker lockout device

    DOEpatents

    Kozlowski, L.J.; Shirey, L.A.

    1992-11-24

    An improved lockout assembly for locking a circuit breaker in a selected off or on position is provided. The lockout assembly includes a lock block and a lock pin. The lock block has a hollow interior which fits over the free end of a switch handle of the circuit breaker. The lock block includes at least one hole that is placed in registration with a hole in the free end of the switch handle. A lock tab on the lock block serves to align and register the respective holes on the lock block and switch handle. A lock pin is inserted through the registered holes and serves to connect the lock block to the switch handle. Once the lock block and the switch handle are connected, the position of the switch handle is prevented from being changed by the lock tab bumping up against a stationary housing portion of the circuit breaker. When the lock pin installed, an apertured-end portion of the lock pin is in registration with another hole on the lock block. Then a special scissors conforming to O.S.H.A. regulations can be installed, with one or more padlocks, on the lockout assembly to prevent removal of the lock pin from the lockout assembly, thereby preventing removal of the lockout assembly from the circuit breaker. 2 figs.

  15. 30 CFR 75.800-1 - Circuit breakers; location.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Circuit breakers; location. 75.800-1 Section 75.800-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY... § 75.800-1 Circuit breakers; location. Circuit breakers protecting high-voltage circuits entering an...

  16. 30 CFR 75.900-1 - Circuit breakers; location.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Circuit breakers; location. 75.900-1 Section 75.900-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY... Alternating Current Circuits § 75.900-1 Circuit breakers; location. Circuit breakers used to protect low-and...

  17. 1. View looking Northeast of Huber Breaker (left), Retail Coal ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. View looking Northeast of Huber Breaker (left), Retail Coal Storage Bins (center), and Power Station (right foreground) Photograph taken by George Harven - Huber Coal Breaker, Breaker, 101 South Main Street, Ashley, Luzerne County, PA

  18. Lockout device for high voltage circuit breaker

    DOEpatents

    Kozlowski, Lawrence J.; Shirey, Lawrence A.

    1993-01-01

    An improved lockout assembly is provided for a circuit breaker to lock the switch handle into a selected switch position. The lockout assembly includes two main elements, each having a respective foot for engaging a portion of the upper housing wall of the circuit breaker. The first foot is inserted into a groove in the upper housing wall, and the second foot is inserted into an adjacent aperture (e.g., a slot) in the upper housing wall. The first foot is slid under and into engagement with a first portion, and the second foot is slid under and into engagement with a second portion of the upper housing wall. At the same time the repsective two feet are placed in engagement with the respective portions of the upper housing wall, two holes, one on each of the respective two main elements of the assembly, are placed in registration; and a locking device, such as a special scissors equipped with a padlock, is installed through the registered holes to secure the lockout assembly on the circuit breaker. When the lockout assembly of the invention is secured on the circuit breaker, the switch handle of the circuit breaker is locked into the selected switch position and prevented from being switched to another switch position.

  19. Lockout device for high voltage circuit breaker

    DOEpatents

    Kozlowski, L.J.; Shirey, L.A.

    1993-01-26

    An improved lockout assembly is provided for a circuit breaker to lock the switch handle into a selected switch position. The lockout assembly includes two main elements, each having a respective foot for engaging a portion of the upper housing wall of the circuit breaker. The first foot is inserted into a groove in the upper housing wall, and the second foot is inserted into an adjacent aperture (e.g., a slot) in the upper housing wall. The first foot is slid under and into engagement with a first portion, and the second foot is slid under and into engagement with a second portion of the upper housing wall. At the same time the respective two feet are placed in engagement with the respective portions of the upper housing wall, two holes, one on each of the respective two main elements of the assembly, are placed in registration; and a locking device, such as a special scissors equipped with a padlock, is installed through the registered holes to secure the lockout assembly on the circuit breaker. When the lockout assembly of the invention is secured on the circuit breaker, the switch handle of the circuit breaker is locked into the selected switch position and prevented from being switched to another switch position.

  20. Circuit breaker lock out assembly

    DOEpatents

    Gordy, W.T.

    1983-05-18

    A lock out assembly for a circuit breaker which consists of a generally step-shaped unitary base with an aperture in the small portion of the step-shaped base and a roughly S shaped retaining pin which loops through the large portion of the step-shaped base. The lock out assembly is adapted to fit over a circuit breaker with the handle switch projecting through the aperture, and the retaining pin projecting into an opening of the handle switch, preventing removal.

  1. Circuit breaker lock out assembly

    DOEpatents

    Gordy, Wade T.

    1984-01-01

    A lock out assembly for a circuit breaker which consists of a generally step-shaped unitary base with an aperture in the small portion of the step-shaped base and a roughly "S" shaped retaining pin which loops through the large portion of the step-shaped base. The lock out assembly is adapted to fit over a circuit breaker with the handle switch projecting through the aperture, and the retaining pin projecting into an opening of the handle switch, preventing removal.

  2. Vision based speed breaker detection for autonomous vehicle

    NASA Astrophysics Data System (ADS)

    C. S., Arvind; Mishra, Ritesh; Vishal, Kumar; Gundimeda, Venugopal

    2018-04-01

    In this paper, we are presenting a robust and real-time, vision-based approach to detect speed breaker in urban environments for autonomous vehicle. Our method is designed to detect the speed breaker using visual inputs obtained from a camera mounted on top of a vehicle. The method performs inverse perspective mapping to generate top view of the road and segment out region of interest based on difference of Gaussian and median filter images. Furthermore, the algorithm performs RANSAC line fitting to identify the possible speed breaker candidate region. This initial guessed region via RANSAC, is validated using support vector machine. Our algorithm can detect different categories of speed breakers on cement, asphalt and interlock roads at various conditions and have achieved a recall of 0.98.

  3. 46 CFR 111.54-1 - Circuit breakers.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Circuit breakers. 111.54-1 Section 111.54-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... breaker must not: (1) Be dependent upon mechanical cooling to operate within its rating; or (2) Have a...

  4. 46 CFR 111.54-1 - Circuit breakers.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Circuit breakers. 111.54-1 Section 111.54-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... breaker must not: (1) Be dependent upon mechanical cooling to operate within its rating; or (2) Have a...

  5. 46 CFR 111.54-1 - Circuit breakers.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Circuit breakers. 111.54-1 Section 111.54-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... breaker must not: (1) Be dependent upon mechanical cooling to operate within its rating; or (2) Have a...

  6. 46 CFR 111.54-1 - Circuit breakers.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Circuit breakers. 111.54-1 Section 111.54-1 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL... breaker must not: (1) Be dependent upon mechanical cooling to operate within its rating; or (2) Have a...

  7. Space and time resolved representation of a vacuum arc light emission

    NASA Astrophysics Data System (ADS)

    Georgescu, N.; Sandolache, G.; Zoita, V.

    1999-04-01

    An optoelectronic multichannel detection system for the study of the visible light emission of a vacuum circuit breaker arc is described. The system consists of two multiple slit collimator assemblies coupled directly to the arc discharge chamber and an electronic detection part. The light emitted by the arc is collected by the two collimator assemblies and is transmitted through optical fibres to the electronic detection part. By using a new, simple computational method two-dimensional plots of the vacuum arc light emission at different times are obtained.

  8. Shotgun cartridge rock breaker

    DOEpatents

    Ruzzi, Peter L.; Morrell, Roger J.

    1995-01-01

    A rock breaker uses shotgun cartridges or other firearm ammunition as the explosive charge at the bottom of a drilled borehole. The breaker includes a heavy steel rod or bar, a gun with a firing chamber for the ammunition which screws onto the rod, a long firing pin running through a central passage in the rod, and a firing trigger mechanism at the external end of the bar which strikes the firing pin to fire the cartridge within the borehole. A tubular sleeve surround the main body of the rod and includes slits the end to allow it to expand. The rod has a conical taper at the internal end against which the end of the sleeve expands when the sleeve is forced along the rod toward the taper by a nut threaded onto the external end of the rod. As the sleeve end expands, it pushes against the borehole and holds the explosive gasses within, and also prevents the breaker from flying out of the borehole. The trigger mechanism includes a hammer with a slot and a hole for accepting a drawbar or drawpin which, when pulled by a long cord, allows the cartridge to be fired from a remote location.

  9. 30 CFR 77.809 - Identification of circuit breakers and disconnecting switches.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Identification of circuit breakers and disconnecting switches. 77.809 Section 77.809 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... circuit breakers and disconnecting switches. Circuit breakers and disconnecting switches shall be labeled...

  10. 30 CFR 77.809 - Identification of circuit breakers and disconnecting switches.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Identification of circuit breakers and disconnecting switches. 77.809 Section 77.809 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... circuit breakers and disconnecting switches. Circuit breakers and disconnecting switches shall be labeled...

  11. 30 CFR 77.809 - Identification of circuit breakers and disconnecting switches.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Identification of circuit breakers and disconnecting switches. 77.809 Section 77.809 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... circuit breakers and disconnecting switches. Circuit breakers and disconnecting switches shall be labeled...

  12. 30 CFR 77.809 - Identification of circuit breakers and disconnecting switches.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Identification of circuit breakers and disconnecting switches. 77.809 Section 77.809 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... circuit breakers and disconnecting switches. Circuit breakers and disconnecting switches shall be labeled...

  13. 30 CFR 77.809 - Identification of circuit breakers and disconnecting switches.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Identification of circuit breakers and disconnecting switches. 77.809 Section 77.809 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... circuit breakers and disconnecting switches. Circuit breakers and disconnecting switches shall be labeled...

  14. An Overview of Dynamic Contact Resistance Measurement of HV Circuit Breakers

    NASA Astrophysics Data System (ADS)

    Bhole, A. A.; Gandhare, W. Z.

    2016-06-01

    With the deregulation of the electrical power industry, utilities and service companies are operating in a changing business environment. High voltage circuit breakers are extremely important for the function of modern electric power supply systems. The need to predict the proper function of circuit breaker grew over the years as the transmission networks expanded. The maintenance of circuit breakers deserves special consideration because of their importance for routine switching and for protection of other equipments. Electric transmission system breakups and equipment destruction can occur if a circuit breaker fails to operate because of a lack of preventive maintenance. Dynamic Contact Resistance Measurement (DCRM) is known as an effective technique for assessing the condition of power circuit breakers contacts and operating mechanism. This paper gives a general review about DCRM. It discusses the practical case studies on use of DCRM for condition assessment of high voltage circuit breakers.

  15. The Voltage Distribution Characteristics of a Hybrid Circuit Breaker During High Current Interruption

    NASA Astrophysics Data System (ADS)

    Cheng, Xian; Duan, Xiongying; Liao, Minfu; Huang, Zhihui; Luo, Yan; Zou, Jiyan

    2013-08-01

    Hybrid circuit breaker (HCB) technology based on a vacuum interrupter and a SF6 interrupter in series has become a new research direction because of the low-carbon requirements for high voltage switches. The vacuum interrupter has an excellent ability to deal with the steep rising part of the transient recovery voltage (TRV), while the SF6 interrupter can withstand the peak part of the voltage easily. An HCB can take advantage of the interrupters in the current interruption process. In this study, an HCB model based on the vacuum ion diffusion equations, ion density equation, and modified Cassie-Mayr arc equation is explored. A simulation platform is constructed by using a set of software called the alternative transient program (ATP). An HCB prototype is also designed, and the short circuit current is interrupted by the HCB under different action sequences of contacts. The voltage distribution of the HCB is analyzed through simulations and tests. The results demonstrate that if the vacuum interrupter withstands the initial TRV and interrupts the post-arc current first, then the recovery speed of the dielectric strength of the SF6 interrupter will be fast. The voltage distribution between two interrupters is determined by their post-arc resistance, which happens after current-zero, and subsequently, it is determined by the capacitive impedance after the post-arc current decays to zero.

  16. Case study on impact performance optimization of hydraulic breakers.

    PubMed

    Noh, Dae-Kyung; Kang, Young-Ky; Cho, Jae-Sang; Jang, Joo-Sup

    2016-01-01

    In order to expand the range of activities of an excavator, attachments, such as hydraulic breakers have been developed to be applied to buckets. However, it is very difficult to predict the dynamic behavior of hydraulic impact devices such as breakers because of high non-linearity. Thus, the purpose of this study is to optimize the impact performance of hydraulic breakers. The ultimate goal of the optimization is to increase the impact energy and impact frequency and to reduce the pressure pulsation of the supply and return lines. The optimization results indicated that the four parameters used to optimize the impact performance of the breaker showed considerable improvement over the results reported in the literature. A test was also conducted and the results were compared with those obtained through optimization in order to verify the optimization results. The comparison showed an average relative error of 8.24 %, which seems to be in good agreement. The results of this study can be used to optimize the impact performance of hydraulic impact devices such as breakers, thus facilitating its application to excavators and increasing the range of activities of an excavator.

  17. 32. INTERIOR VIEW LOOKING NORTH ON THE ORE BREAKER LEVEL. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    32. INTERIOR VIEW LOOKING NORTH ON THE ORE BREAKER LEVEL. THE ORE BREAKER, A BLAKE JAW CRUSHER, IS IN THE BOX IN THE LEFT OF THE PHOTOGRAPH, THE ORE TO BE BROKEN IS FED INTO THE OPENING ON THE FLOOR AND NEXT TO ORE BREAKER BOX. THE GRIZZLY BARS ARE ON THE RIGHT AND THE PULLEYS FROM THE POWER SYSTEM ARE OVERHEAD. - Standard Gold Mill, East of Bodie Creek, Northeast of Bodie, Bodie, Mono County, CA

  18. 28. View looking Northeast, Huber Breaker (left), Retail Coal Storage ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    28. View looking Northeast, Huber Breaker (left), Retail Coal Storage Bins (Center) Power Plant (right) Photograph taken by George Harven - Huber Coal Breaker, 101 South Main Street, Ashley, Luzerne County, PA

  19. 30. Looking to Huber Breaker (left), Retail Coal Storage Bins ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    30. Looking to Huber Breaker (left), Retail Coal Storage Bins (center), and Power Plant (right) Photograph taken by George Harven - Huber Coal Breaker, 101 South Main Street, Ashley, Luzerne County, PA

  20. 44. Blue Coal Corporation Office Building (foreground), Huber Breaker (left), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    44. Blue Coal Corporation Office Building (foreground), Huber Breaker (left), Retail Coal Storage Bins (far center) Photograph taken by George Harven - Huber Coal Breaker, 101 South Main Street, Ashley, Luzerne County, PA

  1. 31. Panoramic shot, Huber Breaker (left), Retail Coal Storage Bins ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    31. Panoramic shot, Huber Breaker (left), Retail Coal Storage Bins (center), Boney Elevator (right) Photographs taken by Joseph E.B. Elliot - Huber Coal Breaker, 101 South Main Street, Ashley, Luzerne County, PA

  2. Detail of motor control cabinet and field breakers. Control cabinet ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail of motor control cabinet and field breakers. Control cabinet and breaker panel built by Cutler-Hammer - Wellton-Mohawk Irrigation System, Pumping Plant No. 3, South of Interstate 8, Wellton, Yuma County, AZ

  3. 30 CFR 75.800 - High-voltage circuits; circuit breakers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... shall be equipped with devices to provide protection against under-voltage grounded phase, short circuit... 30 Mineral Resources 1 2010-07-01 2010-07-01 false High-voltage circuits; circuit breakers. 75.800... § 75.800 High-voltage circuits; circuit breakers. [Statutory Provisions] High-voltage circuits entering...

  4. 30 CFR 77.800 - High-voltage circuits; circuit breakers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... devices to provide protection against under voltage, grounded phase, short circuit and overcurrent. High... 30 Mineral Resources 1 2010-07-01 2010-07-01 false High-voltage circuits; circuit breakers. 77.800... COAL MINES Surface High-Voltage Distribution § 77.800 High-voltage circuits; circuit breakers. High...

  5. 29. Another view looking Northeast closer to Huber Breaker (left), ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    29. Another view looking Northeast closer to Huber Breaker (left), Retail Coal Storage Bins (Center), Power Plant (right) Photograph taken by George Harven - Huber Coal Breaker, 101 South Main Street, Ashley, Luzerne County, PA

  6. Optical Analysis Of The Vacuum Arc Plasma Generated In Cup-Shape Contacts

    NASA Astrophysics Data System (ADS)

    Pavelescu, G.; Pavelescu, D.; Dumitrescu, G.; Anghelita, P.; Gherendi, F.

    2007-04-01

    In this paper are presented the results of the optical analysis on the rotating arc plasma, generated in the vacuum low voltage circuit breaker with cup-shaped contacts. An adequate experimental setup was used for single shot time and spatial resolved spectroscopy in order to analyze the evolution of the vacuum arc plasma. Different current interruption situations are correlated with plasma spectral diagnosis. The study is aimed to contribute to a better understanding of the complex phenomena that take place in the interruption process of high currents that appears in the short-circuit regime of electrical networks.

  7. 1. VIEW OF EAST FRONT OF BREAKER, WITH SCALE STICK, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    1. VIEW OF EAST FRONT OF BREAKER, WITH SCALE STICK, SHOWING FOUNDATIONS OF RETAIL SCALES IN FOREGROUND, LOOKING WEST - Marvine Colliery, Breaker No. 2, West side Boulevard Avenue, between East Parker Street & Route 380, Scranton, Lackawanna County, PA

  8. Breaker zone aerosol dynamics in the southern Baltic Sea

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Zielinski, T.; Zielinski, A.

    This paper presents the results of lidar based investigations of aerosol concentrations and their size distributions over the breaker zones. The measurements were carried out under various weather conditions over breaker zones of the Gulf of Gdansk (1992) and from a station on the open Baltic Sea (International Experiment BAEX in 1993).

  9. Programmable Low-Voltage Circuit Breaker and Tester

    NASA Technical Reports Server (NTRS)

    Greenfield, Terry

    2008-01-01

    An instrumentation system that would comprise a remotely controllable and programmable low-voltage circuit breaker plus several electric-circuit-testing subsystems has been conceived, originally for use aboard a spacecraft during all phases of operation from pre-launch testing through launch, ascent, orbit, descent, and landing. The system could also be adapted to similar use aboard aircraft. In comparison with remotely controllable circuit breakers heretofore commercially available, this system would be smaller, less massive, and capable of performing more functions, as needed for aerospace applications.

  10. Detail of field breakers in the motor control cabinet for ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Detail of field breakers in the motor control cabinet for unit 3. Control cabinet and breaker panel built by Cutler-Hammer - Wellton-Mohawk Irrigation System, Pumping Plant No. 1, Bounded by Gila River & Union Pacific Railroad, Wellton, Yuma County, AZ

  11. 47. Northwest Side of Breaker, Rock Belt Line (foreground), date ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    47. Northwest Side of Breaker, Rock Belt Line (foreground), date unknown Historic Photograph, Photograher Unknown; Collection of William Everett, Jr. (Wilkes-Barre, PA), photocopy by Joseph E.B. Elliot - Huber Coal Breaker, 101 South Main Street, Ashley, Luzerne County, PA

  12. 30 CFR 77.800-1 - Testing, examination, and maintenance of circuit breakers; procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ..., examination, and maintenance of circuit breakers; procedures. (a) Circuit breakers and their auxiliary devices protecting high-voltage circuits to portable or mobile equipment shall be tested and examined at least once... circuit breaker and its auxiliary devices, and such repairs or adjustments as are indicated by such tests...

  13. 51. South side of Breaker, Retail Pockets under Construction Historic ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    51. South side of Breaker, Retail Pockets under Construction Historic Photograph, Photographer Unknown Originally taken by Glen Alden Safety Department, 18 August 1954; Collection of William Everett, Jr. (Wilkes-Barre, PA), photocopy by Joseph E.B. Elliot - Huber Coal Breaker, 101 South Main Street, Ashley, Luzerne County, PA

  14. Statins: antimicrobial resistance breakers or makers?

    PubMed Central

    Lareu, Ricky R.; Dix, Brett R.; Hughes, Jeffery D.

    2017-01-01

    Introduction The repurposing of non-antibiotic drugs as adjuvant antibiotics may help break antimicrobial resistance (AMR). Statins are commonly prescribed worldwide to lower cholesterol. They also possess qualities of AMR “breakers”, namely direct antibacterial activity, synergism with antibiotics, and ability to stimulate the host immune system. However, statins’ role as AMR breakers may be limited. Their current extensive use for cardiovascular protection might result in selective pressures for resistance, ironically causing statins to be AMR “makers” instead. This review examines statins’ potential as AMR breakers, probable AMR makers, and identifies knowledge gaps in a statin-bacteria-human-environment continuum. The most suitable statin for repurposing is identified, and a mechanism of antibacterial action is postulated based on structure-activity relationship analysis. Methods A literature search using keywords “statin” or “statins” combined with “minimum inhibitory concentration” (MIC) was performed in six databases on 7th April 2017. After screening 793 abstracts, 16 relevant studies were identified. Unrelated studies on drug interactions; antifungal or antiviral properties of statins; and antibacterial properties of mevastatin, cerivastatin, antibiotics, or natural products were excluded. Studies involving only statins currently registered for human use were included. Results Against Gram-positive bacteria, simvastatin generally exerted the greatest antibacterial activity (lowest MIC) compared to atorvastatin, rosuvastatin, and fluvastatin. Against Gram-negative bacteria, atorvastatin generally exhibited similar or slightly better activity compared to simvastatin, but both were more potent than rosuvastatin and fluvastatin. Discussion Statins may serve as AMR breakers by working synergistically with existing topical antibiotics, attenuating virulence factors, boosting human immunity, or aiding in wound healing. It is probable that

  15. Biocompatible circuit-breaker chip for thermal management of biomedical microsystems

    NASA Astrophysics Data System (ADS)

    Luo, Yi; Dahmardeh, Masoud; Takahata, Kenichi

    2015-05-01

    This paper presents a thermoresponsive micro circuit breaker for biomedical applications specifically targeted at electronic intelligent implants. The circuit breaker is micromachined to have a shape-memory-alloy cantilever actuator as a normally closed temperature-sensitive switch to protect the device of interest from overheating, a critical safety feature for smart implants including those that are electrothermally driven with wireless micro heaters. The device is fabricated in a size of 1.5  ×  2.0  ×  0.46 mm3 using biocompatible materials and a chip-based titanium package, exhibiting a nominal cold-state resistance of 14 Ω. The breaker rapidly enters the full open condition when the chip temperature exceeds 63 °C, temporarily breaking the circuit of interest to lower its temperature until chip temperature drops to 51 °C, at which the breaker closes the circuit to allow current to flow through it again, physically limiting the maximum temperature of the circuit. This functionality is tested in combination with a wireless resonant heater powered by radio-frequency electromagnetic radiation, demonstrating self-regulation of heater temperature. The developed circuit-breaker chip operates in a fully passive manner that removes the need for active sensor and circuitry to achieve temperature regulation in a target device, contributing to the miniaturization of biomedical microsystems including electronic smart implants where thermal management is essential.

  16. High speed hydraulically-actuated operating system for an electric circuit breaker

    DOEpatents

    Iman, Imdad

    1983-06-07

    This hydraulically-actuated operating system comprises a cylinder, a piston movable therein in an opening direction to open a circuit breaker, and an accumulator for supplying pressurized liquid to a breaker-opening piston-actuating space within the cylinder. A normally-closed valve between the accumulator and the actuating space is openable to allow pressurized liquid from the accumulator to flow through the valve into the actuating space to drive the piston in an opening direction. A dashpotting mechanism operating separately from the hydraulic actuating system is provided, thereby reducing flow restriction interference with breaker opening.

  17. 30 CFR 75.809 - Identification of circuit breakers and disconnecting switches.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... disconnecting switches. 75.809 Section 75.809 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... High-Voltage Distribution § 75.809 Identification of circuit breakers and disconnecting switches. [Statutory Provisions] Circuit breakers and disconnecting switches underground shall be marked for...

  18. 30 CFR 75.809 - Identification of circuit breakers and disconnecting switches.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... disconnecting switches. 75.809 Section 75.809 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... High-Voltage Distribution § 75.809 Identification of circuit breakers and disconnecting switches. [Statutory Provisions] Circuit breakers and disconnecting switches underground shall be marked for...

  19. 30 CFR 75.809 - Identification of circuit breakers and disconnecting switches.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... disconnecting switches. 75.809 Section 75.809 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... High-Voltage Distribution § 75.809 Identification of circuit breakers and disconnecting switches. [Statutory Provisions] Circuit breakers and disconnecting switches underground shall be marked for...

  20. 30 CFR 75.809 - Identification of circuit breakers and disconnecting switches.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... disconnecting switches. 75.809 Section 75.809 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... High-Voltage Distribution § 75.809 Identification of circuit breakers and disconnecting switches. [Statutory Provisions] Circuit breakers and disconnecting switches underground shall be marked for...

  1. 30 CFR 75.809 - Identification of circuit breakers and disconnecting switches.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... disconnecting switches. 75.809 Section 75.809 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... High-Voltage Distribution § 75.809 Identification of circuit breakers and disconnecting switches. [Statutory Provisions] Circuit breakers and disconnecting switches underground shall be marked for...

  2. 40 CFR 86.327-79 - Quench checks; NOX analyzer.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Quench checks; NOX analyzer. (a) Perform the reaction chamber quench check for each model of high vacuum reaction chamber analyzer prior to initial use. (b) Perform the reaction chamber quench check for each new analyzer that has an ambient pressure or “soft vacuum” reaction chamber prior to initial use. Additionally...

  3. 40 CFR 86.327-79 - Quench checks; NOX analyzer.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Quench checks; NOX analyzer. (a) Perform the reaction chamber quench check for each model of high vacuum reaction chamber analyzer prior to initial use. (b) Perform the reaction chamber quench check for each new analyzer that has an ambient pressure or “soft vacuum” reaction chamber prior to initial use. Additionally...

  4. High speed hydraulically-actuated operating system for an electric circuit breaker

    DOEpatents

    Iman, I.

    1983-06-07

    This hydraulically-actuated operating system comprises a cylinder, a piston movable therein in an opening direction to open a circuit breaker, and an accumulator for supplying pressurized liquid to a breaker-opening piston-actuating space within the cylinder. A normally-closed valve between the accumulator and the actuating space is openable to allow pressurized liquid from the accumulator to flow through the valve into the actuating space to drive the piston in an opening direction. A dashpotting mechanism operating separately from the hydraulic actuating system is provided, thereby reducing flow restriction interference with breaker opening. 3 figs.

  5. The Effects of Wind and Surfactants on Mechanically Generated Spilling Breakers

    NASA Astrophysics Data System (ADS)

    Liu, X.; Diorio, J. D.; Duncan, J. H.

    2007-11-01

    The effects of both wind and surfactants on mechanically generated weakly spilling breakers are explored in a wind wave tank that is 11.8 m long, 1.15 m wide and 1.8 m high (1.0 m of water). A wave maker, which resides at the upwind end of the tank, is used to generate the breakers via a dispersive focusing method with a central wave packet frequency of 1.15 Hz. Low wind speeds (less than 3.0 m/s) are used to minimize the effect of short-wavelength wind-generated waves on the breakers. The profiles of the spilling breakers along the center plane of the tank are measured with an LIF technique that utilizes a high-speed digital movie camera. Measurements are performed with clean water and water mixed with various concentrations of Triton X-100, a soluble surfactant. It is found that the capillary waves/bulge patterns found in the initial stages of spilling breakers are dramatically affected by wind and surfactants. The size of bulge increases with the wind speed while the capillary waves are kept nearly the same. In the presence of surfactants and wind, both the amplitude and number of capillary waves are reduced and the slope of the front face of the wave increases.

  6. [Usefullness of the StoneBreaker lithotripter for percutaneous nephrolithotomy].

    PubMed

    del Peso, Almudena Coloma; González, Inmaculada Fernández; Gálvez, Milagros Jiménez; Abad, Pablo Garrido; Fajardo, Gloria Bocardo; Fernández, Luis Miguel Herranz; Arjona, Manuel Fernández; Torres, Lorenzo Herrero; Sanz, Ignacio Pereira

    2008-01-01

    Throughout the history, many devices have been used for breaking urinary tract stones. StoneBreaker (LMA Urology, Gland, Switzerland) is a second generation of intracorporeal lithotripter, pneumatic and portable, which adds several new advantages, like effectiveness in stone fragmentation and easy handling, very useful during percutaneous lithotripsy. We report the case of a 40 year-old male patient, with a left kidney pyelic lithiasis, who was treated by percutaneous lithotripsy, under general anaesthesia, with StoneBreaker (LMA Urology, Gland, Switzerland) as lithotripter. StoneBreaker (LMA Urology, Gland, Switzerland) is a lithotripter usable with rigid and semirigid ureteroscopes, much more powerful than its predecessors. It is able to decrease the number of shocks necessary for stone fragmentation, without bigger tissue reaction. It also has a more comfortable design due to the absence of connections, and its power by replaceable carbon dioxide cartridges.

  7. Development, Integration and Testing of Automated Triggering Circuit for Hybrid DC Circuit Breaker

    NASA Astrophysics Data System (ADS)

    Kanabar, Deven; Roy, Swati; Dodiya, Chiragkumar; Pradhan, Subrata

    2017-04-01

    A novel concept of Hybrid DC circuit breaker having combination of mechanical switch and static switch provides arc-less current commutation into the dump resistor during quench in superconducting magnet operation. The triggering of mechanical and static switches in Hybrid DC breaker can be automatized which can effectively reduce the overall current commutation time of hybrid DC circuit breaker and make the operation independent of opening time of mechanical switch. With this view, a dedicated control circuit (auto-triggering circuit) has been developed which can decide the timing and pulse duration for mechanical switch as well as static switch from the operating parameters. This circuit has been tested with dummy parameters and thereafter integrated with the actual test set up of hybrid DC circuit breaker. This paper deals with the conceptual design of the auto-triggering circuit, its control logic and operation. The test results of Hybrid DC circuit breaker using this circuit have also been discussed.

  8. VIEW OF JOHN ELDER OF JEANNETTE BADGE NO. 66. BREAKER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF JOHN ELDER OF JEANNETTE BADGE NO. 66. BREAKER FOR GENERAL GLASS COMPANY. TAKEN ON BREAKER FLOOR IN FRONT OF BUCK USED TO HOLD GLASS. WORK EQUIPMENT INCLUDES: HARD HAT, SAFETY GLASSES, PROTECTIVE SLEEVES, LEATHER APRON, GLOVES WITH RUBBER PADS ("METATARSALS") WITH OVER STEEL-TOED SHOES. - Chambers-McKee Window Glass Company, Furnace No. 2, Clay Avenue Extension, Jeannette, Westmoreland County, PA

  9. 46 CFR 111.30-4 - Circuit breakers removable from the front.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Circuit breakers removable from the front. 111.30-4 Section 111.30-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-4 Circuit breakers removable from the front...

  10. 46 CFR 111.30-4 - Circuit breakers removable from the front.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Circuit breakers removable from the front. 111.30-4 Section 111.30-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-4 Circuit breakers removable from the front...

  11. 46 CFR 111.30-4 - Circuit breakers removable from the front.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Circuit breakers removable from the front. 111.30-4 Section 111.30-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-4 Circuit breakers removable from the front...

  12. 46 CFR 111.30-4 - Circuit breakers removable from the front.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Circuit breakers removable from the front. 111.30-4 Section 111.30-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-4 Circuit breakers removable from the front...

  13. 46 CFR 111.30-4 - Circuit breakers removable from the front.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Circuit breakers removable from the front. 111.30-4 Section 111.30-4 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) ELECTRICAL ENGINEERING ELECTRIC SYSTEMS-GENERAL REQUIREMENTS Switchboards § 111.30-4 Circuit breakers removable from the front...

  14. 30 CFR 75.800-3 - Testing, examination and maintenance of circuit breakers; procedures.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... High-Voltage Distribution § 75.800-3 Testing, examination and maintenance of circuit breakers; procedures. (a) Circuit breakers and their auxiliary devices protecting underground high-voltage circuits...

  15. Automatic recloser circuit breaker integrated with GSM technology for power system notification

    NASA Astrophysics Data System (ADS)

    Lada, M. Y.; Khiar, M. S. A.; Ghani, S. A.; Nawawi, M. R. M.; Rahim, N. H.; Sinar, L. O. M.

    2015-05-01

    Lightning is one type of transient faults that usually cause the circuit breaker in the distribution board trip due to overload current detection. The instant tripping condition in the circuit breakers clears the fault in the system. Unfortunately most circuit breakers system is manually operated. The power line will be effectively re-energized after the clearing fault process is finished. Auto-reclose circuit is used on the transmission line to carry out the duty of supplying quality electrical power to customers. In this project, an automatic reclose circuit breaker for low voltage usage is designed. The product description is the Auto Reclose Circuit Breaker (ARCB) will trip if the current sensor detects high current which exceeds the rated current for the miniature circuit breaker (MCB) used. Then the fault condition will be cleared automatically and return the power line to normal condition. The Global System for Mobile Communication (GSM) system will send SMS to the person in charge if the tripping occurs. If the over current occurs in three times, the system will fully trip (open circuit) and at the same time will send an SMS to the person in charge. In this project a 1 A is set as the rated current and any current exceeding a 1 A will cause the system to trip or interrupted. This system also provides an additional notification for user such as the emergency light and warning system.

  16. 48 CFR 225.7006 - Restriction on air circuit breakers for naval vessels.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 48 Federal Acquisition Regulations System 3 2011-10-01 2011-10-01 false Restriction on air circuit breakers for naval vessels. 225.7006 Section 225.7006 Federal Acquisition Regulations System DEFENSE... on air circuit breakers for naval vessels. ...

  17. 48 CFR 225.7006 - Restriction on air circuit breakers for naval vessels.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 3 2010-10-01 2010-10-01 false Restriction on air circuit breakers for naval vessels. 225.7006 Section 225.7006 Federal Acquisition Regulations System DEFENSE... on air circuit breakers for naval vessels. ...

  18. 40 CFR 63.1063 - Floating roof requirements.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... opening except those for automatic bleeder vents (vacuum breaker vents) and rim space vents shall have its... vents (vacuum breaker vents), rim space vents, leg sleeves, and deck drains shall be equipped with a... automatic bleeder vent (vacuum breaker vent) and rim space vent shall be equipped with a gasketed lid...

  19. 40 CFR 63.1063 - Floating roof requirements.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... opening except those for automatic bleeder vents (vacuum breaker vents) and rim space vents shall have its... vents (vacuum breaker vents), rim space vents, leg sleeves, and deck drains shall be equipped with a... automatic bleeder vent (vacuum breaker vent) and rim space vent shall be equipped with a gasketed lid...

  20. 40 CFR 63.1063 - Floating roof requirements.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... opening except those for automatic bleeder vents (vacuum breaker vents) and rim space vents shall have its... vents (vacuum breaker vents), rim space vents, leg sleeves, and deck drains shall be equipped with a... automatic bleeder vent (vacuum breaker vent) and rim space vent shall be equipped with a gasketed lid...

  1. 40 CFR 63.1063 - Floating roof requirements.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... opening except those for automatic bleeder vents (vacuum breaker vents) and rim space vents shall have its... vents (vacuum breaker vents), rim space vents, leg sleeves, and deck drains shall be equipped with a... automatic bleeder vent (vacuum breaker vent) and rim space vent shall be equipped with a gasketed lid...

  2. 30 CFR 75.800-4 - Testing, examination, and maintenance of circuit breakers; record.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Underground High-Voltage Distribution § 75.800-4 Testing, examination, and maintenance of circuit breakers... adjustment of all circuit breakers protecting high-voltage circuits which enter any underground area of the...

  3. A novel post-arc current measuring equipment based on vacuum arc commutation and arc blow

    NASA Astrophysics Data System (ADS)

    Liao, Minfu; Ge, Guowei; Duan, Xiongying; Huang, Zhihui

    2017-07-01

    The paper proposes a novel post-arc current measuring equipment (NPACME), which is based on the vacuum arc commutation and magnetic arc blow. The NPACME is composed of the vacuum circuit breaker (VCB), shunt resistor, protective gap, high-precision current sensor and externally applied transverse magnetic field (ETMF). The prototype of the NPACME is designed and controlled by optical fiber communications. The vacuum arc commutation between the vacuum arc and the shunt resistor with ETMF is investigated. The test platform is established in the synthetic short-circuit test and the vacuum arc is observed by the high speed CMOS camera. The mathematic description of the vacuum arc commutation is obtained. Based on the current commutation characteristic, the parameters of the NPACME are optimized and the post-arc current is measured. The measuring result of the post-arc current is accurate with small interference and the post-arc charge is obtained. The experimental results verify that the NPACME is correct and accurate, which can be used to measure the post-arc characteristic in breaking test.

  4. One-dimensional particle-in-cell simulation on the influence of electron and ion temperature on the sheath expansion process in the post-arc stage of vacuum circuit breaker

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mo, Yongpeng; Shi, Zongqian; Jia, Shenli

    2015-02-15

    The inter-contact region of vacuum circuit breakers is filled with residual plasma at the moment when the current is zero after the burning of metal vapor arc. The residual plasma forms an ion sheath in front of the post-arc cathode. The sheath then expands towards the post-arc anode under the influence of a transient recovery voltage. In this study, a one-dimensional particle-in-cell model is developed to investigate the post-arc sheath expansion. The influence of ion and electron temperatures on the decrease in local plasma density at the post-arc cathode side and post-arc anode side is discussed. When the decay inmore » the local plasma density develops from the cathode and anode sides into the high-density region and merges, the overall plasma density in the inter-contact region begins to decrease. Meanwhile, the ion sheath begins to expand faster. Furthermore, the theory of ion rarefaction wave only explains quantitatively the decrease in the overall plasma density at relatively low ion temperatures. With the increase of ion temperature to certain extent, another possible reason for the decrease in the overall plasma density is proposed and results from the more active thermal diffusion of plasma.« less

  5. One-dimensional particle-in-cell simulation on the influence of electron and ion temperature on the sheath expansion process in the post-arc stage of vacuum circuit breaker

    NASA Astrophysics Data System (ADS)

    Mo, Yongpeng; Shi, Zongqian; Jia, Shenli; Wang, Lijun

    2015-02-01

    The inter-contact region of vacuum circuit breakers is filled with residual plasma at the moment when the current is zero after the burning of metal vapor arc. The residual plasma forms an ion sheath in front of the post-arc cathode. The sheath then expands towards the post-arc anode under the influence of a transient recovery voltage. In this study, a one-dimensional particle-in-cell model is developed to investigate the post-arc sheath expansion. The influence of ion and electron temperatures on the decrease in local plasma density at the post-arc cathode side and post-arc anode side is discussed. When the decay in the local plasma density develops from the cathode and anode sides into the high-density region and merges, the overall plasma density in the inter-contact region begins to decrease. Meanwhile, the ion sheath begins to expand faster. Furthermore, the theory of ion rarefaction wave only explains quantitatively the decrease in the overall plasma density at relatively low ion temperatures. With the increase of ion temperature to certain extent, another possible reason for the decrease in the overall plasma density is proposed and results from the more active thermal diffusion of plasma.

  6. Research on burnout fault of moulded case circuit breaker based on finite element simulation

    NASA Astrophysics Data System (ADS)

    Xue, Yang; Chang, Shuai; Zhang, Penghe; Xu, Yinghui; Peng, Chuning; Shi, Erwei

    2017-09-01

    In the failure event of molded case circuit breaker, overheating of the molded case near the wiring terminal has a very important proportion. The burnout fault has become an important factor restricting the development of molded case circuit breaker. This paper uses the finite element simulation software to establish the model of molded case circuit breaker by coupling multi-physics field. This model can simulate the operation and study the law of the temperature distribution. The simulation results show that the temperature near the wiring terminal, especially the incoming side of the live wire, of the molded case circuit breaker is much higher than that of the other areas. The steady-state and transient simulation results show that the temperature at the wiring terminals is abnormally increased by increasing the contact resistance of the wiring terminals. This is consistent with the frequent occurrence of burnout of the molded case in this area. Therefore, this paper holds that the burnout failure of the molded case circuit breaker is mainly caused by the abnormal increase of the contact resistance of the wiring terminal.

  7. 30 CFR 75.601-1 - Short circuit protection; ratings and settings of circuit breakers.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Trailing Cables § 75.601-1 Short circuit protection; ratings and settings of circuit breakers. Circuit breakers providing short circuit protection for trailing cables shall be set so as not to exceed the...

  8. Optimizing the switching time for 400 kV SF6 circuit breakers

    NASA Astrophysics Data System (ADS)

    Ciulica, D.

    2018-01-01

    This paper presents real-time voltage and current analysis for optimizing the wave switching point of the circuit breaker SF6. Circuit Breaker plays an important role in power systems. It provides protection for equipment in embedded stations in transport networks. SF6 Circuit Breaker is very important equipment in Power Systems, which is used for up to 400 kV due to its excellent performance. The controlled switching is used to eliminate transient modes and electrodynamic and dielectric charges in the network at manual switching of capacitor, shunt reactors and power transformers. These effects reduce the reliability and lifetime of the equipment installed on the network, or may lead to erroneous protection.

  9. 30 CFR 75.800-3 - Testing, examination and maintenance of circuit breakers; procedures.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Testing, examination and maintenance of circuit breakers; procedures. 75.800-3 Section 75.800-3 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... High-Voltage Distribution § 75.800-3 Testing, examination and maintenance of circuit breakers...

  10. The Relationship between the Current Waveform just before the Current Zero and the Interruption Ability in the High-speed VCB

    NASA Astrophysics Data System (ADS)

    Niwa, Yoshimitsu; Matsuzaki, Jun; Yokokura, Kunio

    The high-speed vacuum circuit breaker, which forced the fault current to zero was investigated. The test circuit breaker consisted of a vacuum interrupter and a high frequency current source. The vacuum interrupter, which had the axial magnetic field electrode and the disk shape electrode, was tested. The arcing period of the high-speed vacuum circuit breaker is much shorter than that of conventional circuit breaker. The arc behavior of the test electrodes immediately after the contact separation was observed by a high-speed video camcorder. The relation between the current waveform just before the current zero and the interruption ability by varying the high frequency current source was investigated experimentally. The results demonstrate the interruption ability and the arc behavior of the high-speed vacuum circuit breaker. The high current interruption was made possible by the low current period just before the current zero, although the arcing time is short and the arc is concentrated.

  11. A High Power Solid State Circuit Breaker for Military Hybrid Electric Vehicle Applications

    DTIC Science & Technology

    2012-08-01

    the SSCB to isolate a fault, breaker opening is latched and can be reset to reclose the breaker via remote logic input. SSCB state and health...rated load current (125 A). Figure 10 shows that after the SSCB detects a fault and opens, it can also be repeatedly reclosed remotely to attempt to

  12. Computational and Experimental Studies on β-Sheet Breakers Targeting Aβ1–40 Fibrils

    PubMed Central

    Minicozzi, Velia; Chiaraluce, Roberta; Consalvi, Valerio; Giordano, Cesare; Narcisi, Claudia; Punzi, Pasqualina; Rossi, Giancarlo C.; Morante, Silvia

    2014-01-01

    In this work we present and compare the results of extensive molecular dynamics simulations of model systems comprising an Aβ1–40 peptide in water in interaction with short peptides (β-sheet breakers) mimicking the 17–21 region of the Aβ1–40 sequence. Various systems differing in the customized β-sheet breaker structure have been studied. Specifically we have considered three kinds of β-sheet breakers, namely Ac-LPFFD-NH2 and two variants thereof, one obtained by substituting the acetyl group with the sulfonic amino acid taurine (Tau-LPFFD-NH2) and a second novel one in which the aspartic acid is substituted by an asparagine (Ac-LPFFN-NH2). Thioflavin T fluorescence, circular dichroism, and mass spectrometry experiments have been performed indicating that β-sheet breakers are able to inhibit in vitro fibril formation and prevent the β sheet folding of portions of the Aβ1–40 peptide. We show that molecular dynamics simulations and far UV circular dichroism provide consistent evidence that the new Ac-LPFFN-NH2 β-sheet breaker is more effective than the other two in stabilizing the native α-helix structure of Aβ1–40. In agreement with these results thioflavin T fluorescence experiments confirm the higher efficiency in inhibiting Aβ1–40 aggregation. Furthermore, mass spectrometry data and molecular dynamics simulations consistently identified the 17–21 Aβ1–40 portion as the location of the interaction region between peptide and the Ac-LPFFN-NH2 β-sheet breaker. PMID:24584938

  13. "I just wanted to get away": An analysis of spring breakers' travel motivations

    Treesearch

    Nuno F. Ribeiro; Paul E. Durrenberger; Careen M. Yarnal; Garry E. Chick

    2010-01-01

    Scholarly research on Spring Break has grown substantially and has often associated spring breakers' motivations with a number of risky behaviors. Recent research, however, has challenged these assumptions. The purpose of this study was to examine spring breakers' motivations for going on Spring Break. Unlike the media portrayal of Spring Break as a time of...

  14. Lessons Learned "Establishing an Electrically Safe Work Condition" Specifically related to Racking Electrical Breakers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Martinez, Tommy Robert; Romero, Philbert Roland; Garcia, Samuel Anthony

    During low voltage electrical equipment maintenance, a bad breaker was identified. The breaker was racked out from the substation cubicle without following the hazardous energy control process identified in the Integrated Work Document (IWD). The IWD required the substation to be in an electrically safe work condition prior to racking the breaker. Per NFPA 70E requirements, electrical equipment shall be put into an electrically safe work condition before an employee performs work on or interacts with equipment in a manner that increases the likelihood of creating an arc flash. Racking in or out a breaker on an energized bus maymore » increase the likelihood of creating an arc flash dependent on equipment conditions. A thorough risk assessment must be performed prior to performing such a task. The risk assessment determines the risk control measures to be put in place prior to performing the work. Electrical Safety Officers (ESO) can assist in performing risk assessments and incorporating risk control measures.« less

  15. Evaluation of supercapacitors for space applications under thermal vacuum conditions

    NASA Astrophysics Data System (ADS)

    Chin, Keith C.; Green, Nelson W.; Brandon, Erik J.

    2018-03-01

    Commercially available supercapacitor cells from three separate vendors were evaluated for use in a space environment using thermal vacuum (Tvac) testing. Standard commercial cells are not hermetically sealed, but feature crimp or double seam seals between the header and the can, which may not maintain an adequate seal under vacuum. Cells were placed in a small vacuum chamber, and cycled between three separate temperature set points. Charging and discharging of cells was executed following each temperature soak, to confirm there was no significant impact on performance. A final electrical performance check, visual inspection and mass check following testing were also performed, to confirm the integrity of the cells had not been compromised during exposure to thermal cycling under vacuum. All cells tested were found to survive this testing protocol and exhibited no significant impact on electrical performance.

  16. Response of crownvetch planted on anthracite breaker refuse

    Treesearch

    Miroslaw M. Czapowskyj; John P. Mikulecky; Edward A. Sowa

    1968-01-01

    Lime applications were essential to establishment of crownvetch (Coronilla vuria L.) on coal breaker refuse in the Pennsylvania Anthracite Region, and mulch treatments were highly beneficial. Fertilizer applications had only slight effect on either establishment or growth.

  17. The Generating Mechanism of Non-Sustained Disruptive Discharges in Vacuum Interrupters

    NASA Astrophysics Data System (ADS)

    Hara, Daisuke; Taki, Masayuki; Tanaka, Hitoshi; Okawa, Mikio; Yanabu, Satoru

    To develop vacuum circuit breaker (VCB) for higher voltage application, it may be important to understand generating mechanism and its influence of non-sustained disruptive discharges (NSDD) to the systems. So, we carried out the tests using equivalent testing circuit and observed the contacts after testing, For the test, by using commercial vacuum circuit interrupters, AC voltages of 50Hz was applied between contacts for 4 seconds after current interruption, and measured generating frequencies of NSDD vs. the voltages and vs. currents. Typical contact material used in the commercial switching equipment, such as AgWC, CuW, CuCr were tested and compared. Then CuCr's of different composition and manufacturing process are investigated. And CuCr-50 (manufactured by melting process) showed the best performance in all tests. We point out that surface condition may affect the generation of NSDD and also conditioning effect is very important.

  18. A New Test Method of Circuit Breaker Spring Telescopic Characteristics Based Image Processing

    NASA Astrophysics Data System (ADS)

    Huang, Huimin; Wang, Feifeng; Lu, Yufeng; Xia, Xiaofei; Su, Yi

    2018-06-01

    This paper applied computer vision technology to the fatigue condition monitoring of springs, and a new telescopic characteristics test method is proposed for circuit breaker operating mechanism spring based on image processing technology. High-speed camera is utilized to capture spring movement image sequences when high voltage circuit breaker operated. Then the image-matching method is used to obtain the deformation-time curve and speed-time curve, and the spring expansion and deformation parameters are extracted from it, which will lay a foundation for subsequent spring force analysis and matching state evaluation. After performing simulation tests at the experimental site, this image analyzing method could solve the complex problems of traditional mechanical sensor installation and monitoring online, status assessment of the circuit breaker spring.

  19. An Artificially Intelligent Physical Model-Checking Approach to Detect Switching-Related Attacks on Power Systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    El Hariri, Mohamad; Faddel, Samy; Mohammed, Osama

    Decentralized and hierarchical microgrid control strategies have lain the groundwork for shaping the future smart grid. Such control approaches require the cooperation between microgrid operators in control centers, intelligent microcontrollers, and remote terminal units via secure and reliable communication networks. In order to enhance the security and complement the work of network intrusion detection systems, this paper presents an artificially intelligent physical model-checking that detects tampered-with circuit breaker switching control commands whether, due to a cyber-attack or human error. In this technique, distributed agents, which are monitoring sectionalized areas of a given microgrid, will be trained and continuously adapted tomore » verify that incoming control commands do not violate the physical system operational standards and do not put the microgrid in an insecure state. The potential of this approach has been tested by deploying agents that monitor circuit breakers status commands on a 14-bus IEEE benchmark system. The results showed the accuracy of the proposed framework in characterizing the power system and successfully detecting malicious and/or erroneous control commands.« less

  20. Research on Mechanical Fault Prediction Algorithm for Circuit Breaker Based on Sliding Time Window and ANN

    NASA Astrophysics Data System (ADS)

    Wang, Xiaohua; Rong, Mingzhe; Qiu, Juan; Liu, Dingxin; Su, Biao; Wu, Yi

    A new type of algorithm for predicting the mechanical faults of a vacuum circuit breaker (VCB) based on an artificial neural network (ANN) is proposed in this paper. There are two types of mechanical faults in a VCB: operation mechanism faults and tripping circuit faults. An angle displacement sensor is used to measure the main axle angle displacement which reflects the displacement of the moving contact, to obtain the state of the operation mechanism in the VCB, while a Hall current sensor is used to measure the trip coil current, which reflects the operation state of the tripping circuit. Then an ANN prediction algorithm based on a sliding time window is proposed in this paper and successfully used to predict mechanical faults in a VCB. The research results in this paper provide a theoretical basis for the realization of online monitoring and fault diagnosis of a VCB.

  1. 46 CFR 64.19 - External pressure.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... HANDLING SYSTEMS Standards for an MPT § 64.19 External pressure. (a) A tank without a vacuum breaker must be designed to withstand an external pressure of 71/2 psig or more. (b) A tank with a vacuum breaker...

  2. 46 CFR 64.19 - External pressure.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... HANDLING SYSTEMS Standards for an MPT § 64.19 External pressure. (a) A tank without a vacuum breaker must be designed to withstand an external pressure of 71/2 psig or more. (b) A tank with a vacuum breaker...

  3. 46 CFR 64.19 - External pressure.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... HANDLING SYSTEMS Standards for an MPT § 64.19 External pressure. (a) A tank without a vacuum breaker must be designed to withstand an external pressure of 71/2 psig or more. (b) A tank with a vacuum breaker...

  4. 46 CFR 64.19 - External pressure.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... HANDLING SYSTEMS Standards for an MPT § 64.19 External pressure. (a) A tank without a vacuum breaker must be designed to withstand an external pressure of 71/2 psig or more. (b) A tank with a vacuum breaker...

  5. 46 CFR 64.19 - External pressure.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... HANDLING SYSTEMS Standards for an MPT § 64.19 External pressure. (a) A tank without a vacuum breaker must be designed to withstand an external pressure of 71/2 psig or more. (b) A tank with a vacuum breaker...

  6. 62. VIEW LOOKING NORTHWEST AT THE OIL FILLED CIRCUIT BREAKER ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    62. VIEW LOOKING NORTHWEST AT THE OIL FILLED CIRCUIT BREAKER FOR GENERATOR NUMBER 1. CIRCUIT BREAKERS ARE AUTOMATED SWITCHES WHICH DISCONNECT THE GENERATORS FROM THE LINE WHEN SHORT CIRCUITS OCCUR. WHEN CIRCUITS INVOLVING HIGH CURRENTS AND VOLTAGES ARE BROKEN, THE AIR SURROUNDING MECHANICAL PARTS OF THE SWITCH BECOMES IONIZED AND CONTINUES TO CONDUCT ELECTRIC POWER ACROSS ANY GAP IN THE SWITCH CONTACTS. TO PREVENT THIS AND INSURE A POSITIVE INTERRUPTION OF CURRENT, THE SWITCH CONTACTS ARE IMMERSED IN A CONTAINER OF OIL. THE OIL DOES NOT SUPPORT THE FORMATION OF AN ARC AND EFFECTIVELY CUTS OFF THE CURRENT WHEN THE SWITCH CONTACTS ARE OPENED. - New York, New Haven & Hartford Railroad, Cos Cob Power Plant, Sound Shore Drive, Greenwich, Fairfield County, CT

  7. Optimization of the Switch Mechanism in a Circuit Breaker Using MBD Based Simulation

    PubMed Central

    Jang, Jin-Seok; Yoon, Chang-Gyu; Ryu, Chi-Young; Kim, Hyun-Woo; Bae, Byung-Tae; Yoo, Wan-Suk

    2015-01-01

    A circuit breaker is widely used to protect electric power system from fault currents or system errors; in particular, the opening mechanism in a circuit breaker is important to protect current overflow in the electric system. In this paper, multibody dynamic model of a circuit breaker including switch mechanism was developed including the electromagnetic actuator system. Since the opening mechanism operates sequentially, optimization of the switch mechanism was carried out to improve the current breaking time. In the optimization process, design parameters were selected from length and shape of each latch, which changes pivot points of bearings to shorten the breaking time. To validate optimization results, computational results were compared to physical tests with a high speed camera. Opening time of the optimized mechanism was decreased by 2.3 ms, which was proved by experiments. Switch mechanism design process can be improved including contact-latch system by using this process. PMID:25918740

  8. Experimental study of Siphon breaker about size effect in real scale reactor design

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kang, S. H.; Ahn, H. S.; Kim, J. M.

    2012-07-01

    Rupture accident within the pipe of a nuclear reactor is one of the main causes of a loss of coolant accident (LOCA). Siphon-breaking is a passive method that can prevent a LOCA. In this study, either a line or a hole is used as a siphon-breaker, and the effect of various parameters, such as the siphon-breaker size, pipe rupture point, pipe rupture size, and the presence of an orifice, are investigated using an experimental facility similar in size to a full-scale reactor. (authors)

  9. Effect of magnetic attachment with stress breaker on lateral stress to abutment tooth under overdenture.

    PubMed

    Gonda, T; Ikebe, K; Ono, T; Nokubi, T

    2004-10-01

    Recently, a newly developed magnetic attachment with stress breaker was used in retentive components in overdentures. Excessive lateral stress has a more harmful effect on natural teeth than axial stress, and the magnetic attachment with stress breaker is expected to reduce lateral forces on abutment teeth and protect it teeth from excessive stress. However, the properties of this retainer have not yet been determined experimentally. This study compares the lateral forces on abutment teeth for three retainers under loading on the denture base in a model study. A mandibular simulation model is constructed to measure lateral stress. Three types of retentive devices are attached to the canine root. These devices include the conventional root coping, the conventional magnetic attachment and the new magnetic attachment with stress breaker. For each retentive device, load is generated on the occlusal table of the model overdenture, and the lateral stress on the canine root and the displacement of the overdenture measured. The magnetic attachment with stress breaker does not displace the denture and exhibits lower lateral stress in the canine root than conventional root coping and magnetic attachments.

  10. Fault current limiter and alternating current circuit breaker

    DOEpatents

    Boenig, Heinrich J.

    1998-01-01

    A solid-state circuit breaker and current limiter for a load served by an alternating current source having a source impedance, the solid-state circuit breaker and current limiter comprising a thyristor bridge interposed between the alternating current source and the load, the thyristor bridge having four thyristor legs and four nodes, with a first node connected to the alternating current source, and a second node connected to the load. A coil is connected from a third node to a fourth node, the coil having an impedance of a value calculated to limit the current flowing therethrough to a predetermined value. Control means are connected to the thyristor legs for limiting the alternating current flow to the load under fault conditions to a predetermined level, and for gating the thyristor bridge under fault conditions to quickly reduce alternating current flowing therethrough to zero and thereafter to maintain the thyristor bridge in an electrically open condition preventing the alternating current from flowing therethrough for a predetermined period of time.

  11. Fault current limiter and alternating current circuit breaker

    DOEpatents

    Boenig, H.J.

    1998-03-10

    A solid-state circuit breaker and current limiter are disclosed for a load served by an alternating current source having a source impedance, the solid-state circuit breaker and current limiter comprising a thyristor bridge interposed between the alternating current source and the load, the thyristor bridge having four thyristor legs and four nodes, with a first node connected to the alternating current source, and a second node connected to the load. A coil is connected from a third node to a fourth node, the coil having an impedance of a value calculated to limit the current flowing therethrough to a predetermined value. Control means are connected to the thyristor legs for limiting the alternating current flow to the load under fault conditions to a predetermined level, and for gating the thyristor bridge under fault conditions to quickly reduce alternating current flowing therethrough to zero and thereafter to maintain the thyristor bridge in an electrically open condition preventing the alternating current from flowing therethrough for a predetermined period of time. 9 figs.

  12. 54. CLEARANCE OF SITE PRIOR TO CONSTRUCTION OF BREAKER BUILDING, ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    54. CLEARANCE OF SITE PRIOR TO CONSTRUCTION OF BREAKER BUILDING, AND CONSTRUCTION OF EMBANKMENT FOR RAILROAD SPUR. c.1898 (AKZO No. A-3) - Avery Island Salt Works, Akzo Salt Incorporated, Avery Island, Iberia Parish, LA

  13. 40 CFR 65.44 - External floating roof (EFR).

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... external floating roof except for automatic bleeder vents (vacuum breaker vents) and rim space vents does... floating roof shall meet the following specifications: (i) Except for automatic bleeder vents (vacuum breaker vents) and rim space vents, each opening in the noncontact external floating roof shall provide a...

  14. 40 CFR 65.44 - External floating roof (EFR).

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... external floating roof except for automatic bleeder vents (vacuum breaker vents) and rim space vents does... floating roof shall meet the following specifications: (i) Except for automatic bleeder vents (vacuum breaker vents) and rim space vents, each opening in the noncontact external floating roof shall provide a...

  15. 40 CFR 65.44 - External floating roof (EFR).

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... external floating roof except for automatic bleeder vents (vacuum breaker vents) and rim space vents does... floating roof shall meet the following specifications: (i) Except for automatic bleeder vents (vacuum breaker vents) and rim space vents, each opening in the noncontact external floating roof shall provide a...

  16. Observation of copper atoms behavior in a vacuum arc discharge using laser spectroscopy

    NASA Astrophysics Data System (ADS)

    Sung, Y. M.; Hayashi, Y.; Okraku-Yirenkyi, Y.; Otsubo, M.; Honda, C.; Sakoda, T.

    2003-01-01

    In order to investigate the most important parameters influencing the breaking characteristic of a vacuum circuit breaker (VCB), the behavior of copper (Cu) particles emitted from electrodes designed as an imitation of a vacuum valve of the VCB was observed. The temporal-spatial intensity distributions due to Cu particles in an excited state or a neutral state were measured using the laser induced fluorescence (LIF) technique and a charge coupled device camera attached with a special filter. The diffusion velocity of a Cu atom was also investigated by evaluating a Doppler shift of the LIF signal. The results showed that most Cu particles were emitted from the anode and were in an excited state or an ionized state during an arc discharge. Also, Cu particles were distributed between electrodes even after the discharge chocked, and its diffusion velocity in the direction of the cathode from the anode was about 2.6 km/s.

  17. Lime retention in anthracite coal-breaker refuse

    Treesearch

    Miroslaw M. Czapowskyj; Edward A. Sowa

    1973-01-01

    Hydrated lime was applied to extremely acid anthracite coal-breaker refuse at rates of 2.5 and 5.0 tons per acre. The lime raised the pH to neutral range, and this range was still in evidence 7 years after treatment. The pH readings decreased with the depth of the refuse profile, and below 9 inches they approximated those of the control plots. The 2.5-tons-of-lime-per-...

  18. Lime helps establish crownvetch on coal-breaker refuse

    Treesearch

    Miroslaw M. Czapowskyj; Edward A. Sowa

    1976-01-01

    A study was begun in 1965 to determine the effect of lime fertilizer, and mulch on the establishment and growth of crownvetch crowns planted on anthracite coal-breaker refuse. After 7 years the lime application had by far the strongest effect. Both 2.5 and 5.0 tons per acre increased survival and ground cover manyfold, and both treatments were equally beneficial from...

  19. Detusking fence-breaker elephants as an approach in human-elephant conflict mitigation.

    PubMed

    Mutinda, Matthew; Chenge, Geoffrey; Gakuya, Francis; Otiende, Moses; Omondi, Patrick; Kasiki, Samuel; Soriguer, Ramón C; Alasaad, Samer

    2014-01-01

    Human-elephant conflict (HEC) is a recurring problem that appears wherever the range of elephants and humans overlap. Different methods including the use of electric fences are used worldwide to mitigate this conflict. Nonetheless, elephants learn quickly that their tusks do not conduct electricity and use them to break down fences (fence-breakers). In Lewa Wildlife Conservancy, Kenya, destructive elephants (Loxodonta africana) were monitored between 2010 and 2013. The fence-breaking rate reached four incidents (fence-breaking) per elephant per 100 days. Ten bull males and 57 females were identified as fence-breakers. The bulls were involved in 85.07% and the females in 14.93% of incidents. The Kenya Wildlife Service approved detusking (partial cutting of tusks) in four of the 10 fence-breakers as a way of preventing them from breaking down fences, thereby mitigating HEC in the Conservancy. The result of the detusking was a drastic six-fold reduction in damage to fences (range: 1.67 to 14.5 times less fence-breaking) by the four worst fence-breaker elephants, because with trimmed tusks elephants lack the tools to break down fences. Detusking could not totally eliminate fence destruction because, despite lacking their tools, elephants can still destroy fences using their heads, bodies and trunks, albeit less effectively. On the other hand, apart from inherent aesthetic considerations, the detusking of elephants may have certain negative effects on factors such as elephants' social hierarchies, breeding, mate selection and their access to essential minerals and food. Elephant detusking seems to be effective in drastically reducing fence-breaking incidents, nonetheless its negative effects on behaviour, access to food and its aesthetical consequences still need to be further studied and investigated.

  20. Detusking Fence-Breaker Elephants as an Approach in Human-Elephant Conflict Mitigation

    PubMed Central

    Mutinda, Matthew; Chenge, Geoffrey; Gakuya, Francis; Otiende, Moses; Omondi, Patrick; Kasiki, Samuel; Soriguer, Ramón C.; Alasaad, Samer

    2014-01-01

    Background Human-elephant conflict (HEC) is a recurring problem that appears wherever the range of elephants and humans overlap. Different methods including the use of electric fences are used worldwide to mitigate this conflict. Nonetheless, elephants learn quickly that their tusks do not conduct electricity and use them to break down fences (fence-breakers). Methodology/Principal Findings In Lewa Wildlife Conservancy, Kenya, destructive elephants (Loxodonta africana) were monitored between 2010 and 2013. The fence-breaking rate reached four incidents (fence-breaking) per elephant per 100 days. Ten bull males and 57 females were identified as fence-breakers. The bulls were involved in 85.07% and the females in 14.93% of incidents. The Kenya Wildlife Service approved detusking (partial cutting of tusks) in four of the 10 fence-breakers as a way of preventing them from breaking down fences, thereby mitigating HEC in the Conservancy. The result of the detusking was a drastic six-fold reduction in damage to fences (range: 1.67 to 14.5 times less fence-breaking) by the four worst fence-breaker elephants, because with trimmed tusks elephants lack the tools to break down fences. Detusking could not totally eliminate fence destruction because, despite lacking their tools, elephants can still destroy fences using their heads, bodies and trunks, albeit less effectively. On the other hand, apart from inherent aesthetic considerations, the detusking of elephants may have certain negative effects on factors such as elephants' social hierarchies, breeding, mate selection and their access to essential minerals and food. Conclusions Elephant detusking seems to be effective in drastically reducing fence-breaking incidents, nonetheless its negative effects on behaviour, access to food and its aesthetical consequences still need to be further studied and investigated. PMID:24614538

  1. Remote control circuit breaker evaluation testing. [for space shuttles

    NASA Technical Reports Server (NTRS)

    Bemko, L. M.

    1974-01-01

    Engineering evaluation tests were performed on several models/types of remote control circuit breakers marketed in an attempt to gain some insight into their potential suitability for use on the space shuttle vehicle. Tests included the measurement of several electrical and operational performance parameters under laboratory ambient, space simulation, acceleration and vibration environmental conditions.

  2. "Report to the Legislature on": The Implementation of the Special Education Reimbursement ("Circuit Breaker") Program. Line-Item 7061-0012

    ERIC Educational Resources Information Center

    Massachusetts Department of Education, 2008

    2008-01-01

    This paper reports on the implementation of the Special Education Reimbursement ("Circuit Breaker") Program. Fiscal Year 2007 is the fourth year implementing the Circuit Breaker reimbursement program which provides additional state support for students with disabilities. School districts are eligible for a reimbursement of eligible costs…

  3. The original westinghouse circuit breakers, manufactured 7/11/27. Utility room, to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    The original westinghouse circuit breakers, manufactured 7/11/27. Utility room, to north. - San Bernardino Valley College, Life Science Building, 701 South Mount Vernon Avenue, San Bernardino, San Bernardino County, CA

  4. 37. SAR2, SHOWING OIL CIRCUIT BREAKERS (ABOVE) AND GENERATOR FIELD ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    37. SAR-2, SHOWING OIL CIRCUIT BREAKERS (ABOVE) AND GENERATOR FIELD COIL CONTROL RHEOSTATS (BELOW). SCE negative no. 10331, November 1, 1923. Photograph by G. Haven Bishop. - Santa Ana River Hydroelectric System, SAR-2 Powerhouse, Redlands, San Bernardino County, CA

  5. New muonic-atom test of vacuum polarization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Dixit, M.S.; Carter, A.L.; Hincks, E.P.

    1975-12-15

    In order to check the discrepancy between calculation and experiment in muonic atoms, we have remeasured the 5g-4f transitions in Pb and the 5g-4f and the 4f-3d transitions in Ba. Our new results show no discrepancy and confirm recent theoretical calculations of vacuum polarization to within 0.5%. (AIP)

  6. Insulation Technology in Dry Air and Vacuum for a 72kV Low Pressured Dry Air Insulated Switchgear

    NASA Astrophysics Data System (ADS)

    Yoshida, Tadahiro; Koga, Hiromi; Harada, Takakazu; Miki, Shinichi; Arioka, Masahiro; Sato, Shinji; Yoshida, Satoru; Inoue, Naoaki; Maruyama, Akihiko; Takeuchi, Toshie

    A new 72kV rated low pressured dry air insulated switchgear applying electromagnetic actuation and function that supports CBM has been developed. First, dielectric characteristics in dry air under lightning impulse application has been investigated at bare and insulator covered electrodes. Dependence of the breakdown electric field strength on the effective area has been clarified to apply the configuration design of the insulation mold for the vacuum interrupter. In addition, moisture volume dependence on surface resistance has been clarified to decide moisture volume in gas pressure tank. Next, a new vacuum circuit breaker (VCB) has been designed. To keep dimensions from former 72kV SF6 gas insulated switchgear, distance between contacts in vacuum interrupter is needed to be shorter than that of former switchgear. Voltage withstand capability between electrodes practically designed for vacuum interrupter has been investigated under dc voltage application simulated the small capacitive current breaking test. Gap configuration including contacts and slits has been optimized and distance has been shortened 11% from former switchgear. As a result, the new low pressured dry air insulated switchgear has been designed comparably in outer size to former SF6 gas insulated switchgear. Using dry air as an insulation medium with low pressure has been able to reduce the environmental burden.

  7. Overview spectra and axial distribution of spectral line intensities in a high-current vacuum arc with CuCr electrodes

    NASA Astrophysics Data System (ADS)

    Lisnyak, M.; Pipa, A. V.; Gorchakov, S.; Iseni, S.; Franke, St.; Khapour, A.; Methling, R.; Weltmann, K.-D.

    2015-09-01

    Spectroscopic investigations of free-burning vacuum arcs in diffuse mode with CuCr electrodes are presented. The experimental conditions of the investigated arc correspond to the typical system for vacuum circuit breakers. Spectra of six species Cu I, Cu II, Cu III, Cr I, Cr II, and Cr III have been analyzed in the wavelength range 350-810 nm. The axial intensity distributions were found to be strongly dependent on the ionization stage of radiating species. Emission distributions of Cr II and Cu II can be distinguished as well as the distributions of Cr III and Cu III. Information on the axial distribution was used to identify the spectra and for identification of overlapping spectral lines. The overview spectra and some spectral windows recorded with high resolution are presented. Analysis of axial distributions of emitted light, which originates from different ionization states, is presented and discussed.

  8. Building Community in the Classroom through Ice-Breakers and Parting Ways

    ERIC Educational Resources Information Center

    Eggleston, Tami; Smith, Gabie

    2004-01-01

    Many instructors are concerned with creating a community in the classroom. Although there are numerous published "ice-breakers," many of these techniques are not specific to psychology courses or have been used so much that the students see them as redundant and cliche. Icebreakers are better if they have relevance to a specific class, are…

  9. Overview spectra and axial distribution of spectral line intensities in a high-current vacuum arc with CuCr electrodes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lisnyak, M.; Pipa, A. V.; Gorchakov, S., E-mail: gorchakov@inp-greifswald.de, E-mail: weltmann@inp-greifswald.de

    2015-09-28

    Spectroscopic investigations of free-burning vacuum arcs in diffuse mode with CuCr electrodes are presented. The experimental conditions of the investigated arc correspond to the typical system for vacuum circuit breakers. Spectra of six species Cu I, Cu II, Cu III, Cr I, Cr II, and Cr III have been analyzed in the wavelength range 350–810 nm. The axial intensity distributions were found to be strongly dependent on the ionization stage of radiating species. Emission distributions of Cr II and Cu II can be distinguished as well as the distributions of Cr III and Cu III. Information on the axial distribution wasmore » used to identify the spectra and for identification of overlapping spectral lines. The overview spectra and some spectral windows recorded with high resolution are presented. Analysis of axial distributions of emitted light, which originates from different ionization states, is presented and discussed.« less

  10. Discussion of Electrode Conditioning Mechanism Based on Pre-breakdown Current under Non-uniform Electric Field in Vacuum

    NASA Astrophysics Data System (ADS)

    Yasuoka, Takanori; Kato, Tomohiro; Kato, Katsumi; Okubo, Hitoshi

    Electrode conditioning is very important technique for improvement of the insulation performance of vacuum circuit breakers (VCBs). This paper discusses the spark conditioning mechanism under non-uniform electric field focused on the pre-breakdown current. We quantitatively evaluated the spark conditioning effect by analyzing the pre-breakdown current based on Fowler-Nordheim equation. As a result, field enhancement factor β decreased with the increasing in breakdown voltage in the beginning of conditioning process, and finally β was saturated with the saturation of breakdown voltage. In addition, in case of non-uniform field, we found that β on high voltage rod electrode after conditioning varied according to the electric field strength on the rod electrode.

  11. KENNEDY SPACE CENTER, FLA. - During power-up of the orbiter Discovery in the Orbiter Processing Facility, a technician (left) looks at the circuit breaker lights in the cabin. Discovery has been undergoing Orbiter Major Modifications in the past year, ranging from wiring, control panels and black boxes to gaseous and fluid systems tubing and components. These systems were deserviced, disassembled, inspected, modified, reassembled, checked out and reserviced, as were most other systems onboard. The work includes the installation of the Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.”

    NASA Image and Video Library

    2003-08-27

    KENNEDY SPACE CENTER, FLA. - During power-up of the orbiter Discovery in the Orbiter Processing Facility, a technician (left) looks at the circuit breaker lights in the cabin. Discovery has been undergoing Orbiter Major Modifications in the past year, ranging from wiring, control panels and black boxes to gaseous and fluid systems tubing and components. These systems were deserviced, disassembled, inspected, modified, reassembled, checked out and reserviced, as were most other systems onboard. The work includes the installation of the Multifunction Electronic Display Subsystem (MEDS) - a state-of-the-art “glass cockpit.”

  12. Kinetic Studies of Inhibition of the Aβ(1–42) Aggregation Using a Ferrocene-tagged β-Sheet Breaker Peptide

    PubMed Central

    Zhang, Lin; Yagnik, Gargey; Peng, Yong; Wang, Jianxiu; Xu, H. Howard; Hao, Yuanqiang; Liu, You-Nian; Zhou, Feimeng

    2013-01-01

    The aggregation of amyloidogenic proteins/peptides has been closely linked to the neuropathology of several important neurological disorders. In Alzheimer's disease (AD), amyloid beta (Aβ) peptides and their aggregation are believed to be at least partially responsible for the etiology of AD. The aggregate-inflicted cellular toxicity can be inhibited by short peptides whose sequence are homologous to segments of the Aβ(1–42) peptide responsible for β-sheet stacking (referred to as the β-sheet breaker peptides). Herein a water-soluble ferrocene (Fc)-tagged β-sheet breaker peptide (Fc-KLVFFK6) is used as an electrochemical probe for kinetic studies of the inhibition of the Aβ(1–42) fibrillation process and for determination of the optimal concentration of β-sheet breaker peptide for efficient inhibition. Our results demonstrated that Fc-KLVFFK6 interacts with the Aβ aggregates instantaneously in solution, and sub-stoichiometric amount of Fc-KLVFFK6 is sufficient to inhibit the formation of the Aβ oligomers and fibrils and to reduce the toxicity of Aβ(1–42). The interaction between Fc-KLVFFK6 and Aβ(1–42) follows a pseudo-first-order reaction, with a rate constant of 1.89 ± 0.05 × 10−4 s−1. Tagging β-sheet breaker peptides with a redox label facilitates design, screening, and rational use of peptidic inhibitors for impeding/altering Aβ aggregation. PMID:23232068

  13. Enhanced rhamnolipids production via efficient foam-control using stop valve as a foam breaker.

    PubMed

    Long, Xuwei; Shen, Chong; He, Ni; Zhang, Guoliang; Meng, Qin

    2017-01-01

    In this study, a stop valve was used as a foam breaker for dealing with the massive overflowing foam in rhamnolipid fermentation. As found, a stop valve at its tiny opening could break over 90% of the extremely stable rhamnolipid foam into enriched liquid when foam flows through the sharp gap in valve. The efficient foam-control by the stop valve considerably improved the rhamnolipid fermentation and significantly enhanced the rhamnolipid productivity by 83% compared to the regular fermentation. This efficient foam breaking was mainly achieved by a high shear rate in combination with fast separation of air from the collapsed foam. Altogether, the stop valve possessed a great activity in breaking rhamnolipid foam, and the involving mechanism holds the potential for developing efficient foam breakers for industrial rhamnolipid fermentation. Copyright © 2016. Published by Elsevier Ltd.

  14. Series resonance inverter with triggered vacuum gaps

    NASA Astrophysics Data System (ADS)

    Damstra, Geert C.; Zhang, X.

    1994-05-01

    Series resonance inverters based on semi-conductor switching elements are well-known and have a wide range of application, mainly for lower voltages. For high voltage application many switching elements have to be put in series to obtain sufficient blocking voltage. Voltage grinding and multiple gate control elements are needed. There is much experience with the triggered vacuum gaps as high voltage/high current single shot elements, for example in reignition circuits for synthetic circuit breaker tests. These elements have a blocking voltage of 50 - 100 kV and are triggerable by a light fiber control device. A prototype inverter has been developed that generates 0.1 Hz, 30 kV AC voltages with a flat top for tests on cables and capacitors of many micro farads fed from a low voltage supply of about 600 V. Only two TVG elements are needed to switch the resonant circuit alternatively on the positive or negative supply. The resonant circuit itself consists of the capacitance of the testobject and a high quality inductor that determines the frequency and the peak current of the voltage reversing process.

  15. Hydraulically-actuated operating system for an electric circuit breaker

    DOEpatents

    Barkan, Philip; Imam, Imdad

    1978-01-01

    This hydraulically-actuated operating system comprises a cylinder, a piston movable therein in an opening direction to open a circuit breaker, and an accumulator for supplying pressurized liquid to a piston-actuating space within the cylinder. A normally-closed valve between the accumulator and the actuating space is openable to allow pressurized liquid from the accumulator to flow through the valve into the actuating space to drive the piston in an opening direction. A vent is located hydraulically between the actuating space and the valve for affording communication between said actuating space and a low pressure region. Flow control means is provided for restricting leakage through said vent to a rate that prevents said leakage from substantially detracting from the development of pressure within said actuatng space during the period from initial opening of the valve to the time when said piston has moved through most of its opening stroke. Following such period and while the valve is still open, said flow control means allows effective leakage through said vent. The accumulator has a limited capacity that results in the pressure within said actuating space decaying promptly to a low value as a result of effective leakage through said vent after the piston has moved through a circuit-breaker opening stroke and while the valve is in its open state. Means is provided for resetting the valve to its closed state in response to said pressure decay in the actuating space.

  16. The Implications of the Use of Parental Choice as a Legal "Circuit Breaker"

    ERIC Educational Resources Information Center

    Mead, Julie F.; Lewis, Maria M.

    2016-01-01

    This study explores four instances where parental choice has been employed as a legal "circuit breaker": (a) First Amendment Establishment Clause cases related to public funding, (b) Fourteenth Amendment Equal Protection cases regarding race-conscious student assignment, (c) Title IX regulations concerning single-sex education, and (d) a…

  17. On issue of reconstruction at central distribution substation by example of one of plants of Chelyabinsk region

    NASA Astrophysics Data System (ADS)

    Brylina, O. G.; Semenova, K. D.; Shashkin, V. YU

    2018-03-01

    The article considers the issues of increasing the reliability and economy of the distribution substation. The result is found due to the reconstruction of the central distribution substation and one of the plants of Chelyabinsk region. The reasons for the reconstruction are explained. A comparison of oil and vacuum circuit breakers is made. The advantages of vacuum circuit breakers are shown. Alternative replacement of cables is offered. The basic technical characteristics of the cable brands are shown. The results of reconstruction are proved.

  18. Self-consistent radiation-based simulation of electric arcs: II. Application to gas circuit breakers

    NASA Astrophysics Data System (ADS)

    Iordanidis, A. A.; Franck, C. M.

    2008-07-01

    An accurate and robust method for radiative heat transfer simulation for arc applications was presented in the previous paper (part I). In this paper a self-consistent mathematical model based on computational fluid dynamics and a rigorous radiative heat transfer model is described. The model is applied to simulate switching arcs in high voltage gas circuit breakers. The accuracy of the model is proven by comparison with experimental data for all arc modes. The ablation-controlled arc model is used to simulate high current PTFE arcs burning in cylindrical tubes. Model accuracy for the lower current arcs is evaluated using experimental data on the axially blown SF6 arc in steady state and arc resistance measurements close to current zero. The complete switching process with the arc going through all three phases is also simulated and compared with the experimental data from an industrial circuit breaker switching test.

  19. Suppressing breakers with polar oil films: Using an epic sea rescue to model wave energy budgets

    NASA Astrophysics Data System (ADS)

    Cox, Charles S.; Zhang, Xin; Duda, Timothy F.

    2017-02-01

    Oil has been used to still stormy seas for centuries, but the mechanisms are poorly understood. Here we examine the processes by using quantitative information from a remarkable 1883 sea rescue where oil was used to reduce large breakers during a storm. Modeling of the oil film's extent and waves under the film suggests that large breakers were suppressed by a reduction of wind energy input. Modification of surface roughness by the film is hypothesized to alter the wind profile above the sea and the energy flow. The results are central to understanding air-sea momentum exchange, including its role in such processes as cyclone growth and storm surge, although they address only one aspect of the complex problem of wind interaction with the ocean surface.

  20. K(3)EDTA Vacuum Tubes Validation for Routine Hematological Testing.

    PubMed

    Lima-Oliveira, Gabriel; Lippi, Giuseppe; Salvagno, Gian Luca; Montagnana, Martina; Poli, Giovanni; Solero, Giovanni Pietro; Picheth, Geraldo; Guidi, Gian Cesare

    2012-01-01

    Background and Objective. Some in vitro diagnostic devices (e.g, blood collection vacuum tubes and syringes for blood analyses) are not validated before the quality laboratory managers decide to start using or to change the brand. Frequently, the laboratory or hospital managers select the vacuum tubes for blood collection based on cost considerations or on relevance of a brand. The aim of this study was to validate two dry K(3)EDTA vacuum tubes of different brands for routine hematological testing. Methods. Blood specimens from 100 volunteers in two different K(3)EDTA vacuum tubes were collected by a single, expert phlebotomist. The routine hematological testing was done on Advia 2120i hematology system. The significance of the differences between samples was assessed by paired Student's t-test after checking for normality. The level of statistical significance was set at P < 0.05. Results and Conclusions. Different brand's tubes evaluated can represent a clinically relevant source of variations only on mean platelet volume (MPV) and platelet distribution width (PDW). Basically, our validation will permit the laboratory or hospital managers to select the brand's vacuum tubes validated according to him/her technical or economical reasons for routine hematological tests.

  1. Irradiation and measurements of fluorinated ethylene-propylene-A on silicon solar cells in vacuum

    NASA Technical Reports Server (NTRS)

    Marsik, S. J.; Broder, J. D.

    1975-01-01

    Silicon monoxide (SiO) coated silicon solar cells covered with fluorinated ethylene-propylene-A (FEP-A) were irradiated by 1-MeV electrons in vacuum. The effect of irradiation on the light transmittance of FEP-A was checked by measuring the short-circuit current of the cells while in vacuum after each dose increment, immediately after the irradiation, and again after a minimum elapsed time of 16 hr. The results indicated no apparent loss in transmission due to irradiation of FEP-A and no delamination from the SiO surface while the cells were in vacuum, but embrittlement of FEP-A occurred at the accumulated dose.

  2. Optical diagnostics of the arc plasma using fast intensified CCD-spectrograph system

    NASA Astrophysics Data System (ADS)

    Pavelescu, Gabriela; Guillot, Stephane; Braic, Mariana T.; Hong, Dunpin; Pavelescu, D.; Fleurier, Claude; Braic, Viorel; Gherendi, F.; Dumitrescu, G.; Anghelita, P.; Bauchire, J. M.

    2004-10-01

    Spectroscopic diagnostics, using intensified high speed CCD camera, was applied to study the arc dynamics in low voltage circuit breakers, in vacuum and in air. Time-resolved emission spectroscopy of the vacuum arc plasma, generated during electrode separation, provided information about the interruption process. The investigations were focused on the partial unsuccessful interruption around current zero. Absorption spectroscopy, in a peculiar setup, was used in order to determine the metallic atoms densities in the interelectrode space of a low voltage circuit breaker, working in ambient air.

  3. Communication Satellite Payload Special Check out Equipment (SCOE) for Satellite Testing

    NASA Astrophysics Data System (ADS)

    Subhani, Noman

    2016-07-01

    This paper presents Payload Special Check out Equipment (SCOE) for the test and measurement of communication satellite Payload at subsystem and system level. The main emphasis of this paper is to demonstrate the principle test equipment, instruments and the payload test matrix for an automatic test control. Electrical Ground Support Equipment (EGSE)/ Special Check out Equipment (SCOE) requirements, functions and architecture for C-band and Ku-band payloads are presented in details along with their interface with satellite during different phases of satellite testing. It provides test setup, in a single rack cabinet that can easily be moved from payload assembly and integration environment to thermal vacuum chamber all the way to launch site (for pre-launch test and verification).

  4. 46 CFR 54.01-40 - External pressure (modifies UG-28).

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... at times be subjected to partial vacuum due to nature of the contents, temperature, unloading operations, or other facet of employment shall either have vacuum breaker protection or be designed for not...

  5. 46 CFR 54.01-40 - External pressure (modifies UG-28).

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... at times be subjected to partial vacuum due to nature of the contents, temperature, unloading operations, or other facet of employment shall either have vacuum breaker protection or be designed for not...

  6. 46 CFR 54.01-40 - External pressure (modifies UG-28).

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... at times be subjected to partial vacuum due to nature of the contents, temperature, unloading operations, or other facet of employment shall either have vacuum breaker protection or be designed for not...

  7. 46 CFR 54.01-40 - External pressure (modifies UG-28).

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... at times be subjected to partial vacuum due to nature of the contents, temperature, unloading operations, or other facet of employment shall either have vacuum breaker protection or be designed for not...

  8. 46 CFR 54.01-40 - External pressure (modifies UG-28).

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... at times be subjected to partial vacuum due to nature of the contents, temperature, unloading operations, or other facet of employment shall either have vacuum breaker protection or be designed for not...

  9. Performance of red pine and Japanese larch planted on anthracite coal-breaker refuse

    Treesearch

    Miroslaw M. Czapowskyj

    1973-01-01

    Red pine (Pinus resinosa Ait.) and Japanese larch (Larix leptolepis (Sieb. and Zucc.) Gord.) seedlings were planted on coal-breaker refuse with all combinations of two levels of lime, two levels of fertilizer, and four mulch treatments. The site was highly unfavorable as a medium for tree growth, and the 4-year results show...

  10. Perturbative test of exact vacuum expectation values of local fields in affine Toda theories

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ahn, Changrim; Baseilhac, P.; Kim, Chanju

    Vacuum expectation values of local fields for all dual pairs of nonsimply laced affine Toda field theories recently proposed are checked against perturbative analysis. The computations based on Feynman diagram expansion are performed up to the two-loop level. We obtain, good agreement.

  11. K3EDTA Vacuum Tubes Validation for Routine Hematological Testing

    PubMed Central

    Lima-Oliveira, Gabriel; Lippi, Giuseppe; Salvagno, Gian Luca; Montagnana, Martina; Poli, Giovanni; Solero, Giovanni Pietro; Picheth, Geraldo; Guidi, Gian Cesare

    2012-01-01

    Background and Objective. Some in vitro diagnostic devices (e.g, blood collection vacuum tubes and syringes for blood analyses) are not validated before the quality laboratory managers decide to start using or to change the brand. Frequently, the laboratory or hospital managers select the vacuum tubes for blood collection based on cost considerations or on relevance of a brand. The aim of this study was to validate two dry K3EDTA vacuum tubes of different brands for routine hematological testing. Methods. Blood specimens from 100 volunteers in two different K3EDTA vacuum tubes were collected by a single, expert phlebotomist. The routine hematological testing was done on Advia 2120i hematology system. The significance of the differences between samples was assessed by paired Student's t-test after checking for normality. The level of statistical significance was set at P < 0.05. Results and Conclusions. Different brand's tubes evaluated can represent a clinically relevant source of variations only on mean platelet volume (MPV) and platelet distribution width (PDW). Basically, our validation will permit the laboratory or hospital managers to select the brand's vacuum tubes validated according to him/her technical or economical reasons for routine hematological tests. PMID:22888448

  12. 31 CFR 240.3 - Electronic checks and substitute checks.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance:Treasury 2 2011-07-01 2011-07-01 false Electronic checks and substitute... OF CHECKS DRAWN ON THE UNITED STATES TREASURY General Provisions § 240.3 Electronic checks and substitute checks. (a) Legal equivalence of electronic checks. An electronic check for which a presenting...

  13. 31 CFR 240.3 - Electronic checks and substitute checks.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance:Treasury 2 2012-07-01 2012-07-01 false Electronic checks and substitute... OF CHECKS DRAWN ON THE UNITED STATES TREASURY General Provisions § 240.3 Electronic checks and substitute checks. (a) Legal equivalence of electronic checks. An electronic check for which a presenting...

  14. 31 CFR 240.3 - Electronic checks and substitute checks.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Electronic checks and substitute... OF CHECKS DRAWN ON THE UNITED STATES TREASURY General Provisions § 240.3 Electronic checks and substitute checks. (a) Legal equivalence of electronic checks. An electronic check for which a presenting...

  15. 30 CFR 57.11058 - Check-in, check-out system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Check-in, check-out system. 57.11058 Section 57... Escapeways Escapeways-Underground Only § 57.11058 Check-in, check-out system. Each operator of an underground mine shall establish a check-in and check-out system which shall provide an accurate record of persons...

  16. 30 CFR 57.11058 - Check-in, check-out system.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Check-in, check-out system. 57.11058 Section 57... Escapeways Escapeways-Underground Only § 57.11058 Check-in, check-out system. Each operator of an underground mine shall establish a check-in and check-out system which shall provide an accurate record of persons...

  17. 30 CFR 57.11058 - Check-in, check-out system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Check-in, check-out system. 57.11058 Section 57... Escapeways Escapeways-Underground Only § 57.11058 Check-in, check-out system. Each operator of an underground mine shall establish a check-in and check-out system which shall provide an accurate record of persons...

  18. 30 CFR 57.11058 - Check-in, check-out system.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Check-in, check-out system. 57.11058 Section 57... Escapeways Escapeways-Underground Only § 57.11058 Check-in, check-out system. Each operator of an underground mine shall establish a check-in and check-out system which shall provide an accurate record of persons...

  19. 30 CFR 57.11058 - Check-in, check-out system.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Check-in, check-out system. 57.11058 Section 57... Escapeways Escapeways-Underground Only § 57.11058 Check-in, check-out system. Each operator of an underground mine shall establish a check-in and check-out system which shall provide an accurate record of persons...

  20. The Modern Measurement Technology And Checking Of Shafs Parameters

    NASA Astrophysics Data System (ADS)

    Tichá, Šárka; Botek, Jan

    2015-12-01

    This paper is focused on rationalization checking parameters of shaft in companies engaged in the production of components of electric motors, wind turbines and vacuum systems. Customers increasing constantly their requirements to ensure the overall quality of the product, i.e. the quality of machining, dimensional and shape accuracy and overall purity of the subscribed products. The aim of this paper is to introduce using modern measurement technology in controlling these components and compare the results with existing control methodology. The main objective of this rationalization is to eliminate mistakes and shortcomings of current inspection methods.

  1. Simulation of switching overvoltages in the mine electric power supply system

    NASA Astrophysics Data System (ADS)

    Ivanchenko, D. I.; Novozhilov, N. G.

    2017-02-01

    Overvoltages occur in mine power supply systems during switching off consumers with high inductive load, such as transformers, reactors and electrical machines. Overvoltages lead to an increase of insulation degradation rate and may cause electric faults, power outage, fire and explosion of methane and coal dust. This paper is dedicated to simulation of vacuum circuit breaker switching overvoltages in a mine power supply system by means of Simulink MATLAB. The model of the vacuum circuit breaker implements simulation of transient recovery voltage, current chopping and an electric arc. Obtained results were compared to available experimental data.

  2. The Working of Circuit Breakers Within Percolation Models for Financial Markets

    NASA Astrophysics Data System (ADS)

    Ehrenstein, Gudrun; Westerhoff, Frank

    We use a modified Cont-Bouchaud model to explore the effectiveness of trading breaks. The modifications include that the trading activity of the market participants depends positively on historical volatility and that the orders of the agents are conditioned on the observed mispricing. Trading breaks, also called circuit breakers, interrupt the trading process when prices are about to exceed a pre-specified limit. We find that trading breaks are a useful instrument to stabilize financial markets. In particular, trading breaks may reduce price volatility and deviations from fundamentals.

  3. Preparation of W/CuCrZr mono-block test mock-up using vacuum brazing technique

    NASA Astrophysics Data System (ADS)

    Premjit Singh, K.; Khirwadkar, S.; Bhope, Kedar; Patel, Nikunj; Mokaria, Prakash

    2017-04-01

    Development of the joining for W/CuCrZr mono-block PFC test mock-up is an interesting area in Fusion R&D. W/Cu bimetallic material has been prepared using OFHC Copper casting approach on the radial surface of W mono-block tile surface. The W/Cu bimetallic material has been joined with CuCrZr tube (heat sink) material with the vacuum brazing route. Vacuum brazing of W/Cu-CuCrZr has been performed @ 970°C for 10 min using NiCuMn-37 filler material under deep vacuum environment (10-6 mbar). Graphite fixture was used for OFHC Copper casting and vacuum brazing experiments. The joint integrity of W/Cu-CuCrZr mono-block mock-up of W/Cu and Cu-CuCrZr interface has been checked using ultrasonic immersion technique. The result of the experimental work is presented in the paper.

  4. Effect of electron irradiation in vacuum on FEP-A silicon solar cell covers

    NASA Technical Reports Server (NTRS)

    Marsik, S. J.; Broder, J. D.

    1975-01-01

    Fluorinated ethylene-propylene-A (FEP-A) covers on silicon solar cells were irradiated with 1-MeV electrons, in vacuum, to an accumulated fluence equivalent to approximately 28 years in synchronous orbit. The effect of irradiation on the light transmittance of FEP-A was checked by measuring the short-circuit current of the cells after each dose increment. The results indicate no apparent overall loss in transmission due to irradiation of FEP-A. Filter wheel measurements revealed some darkening of the FEP-A at the blue end of the spectrum. Although no delamination from the cell surface was observed while in vacuum, embrittlement of FEP-A occurred at the accumulated dose.

  5. Vacuum force

    NASA Astrophysics Data System (ADS)

    Han, Yongquan

    2015-03-01

    To study on vacuum force, we must clear what is vacuum, vacuum is a space do not have any air and also ray. There is not exist an absolute the vacuum of space. The vacuum of space is relative, so that the vacuum force is relative. There is a certain that vacuum vacuum space exists. In fact, the vacuum space is relative, if the two spaces compared to the existence of relative vacuum, there must exist a vacuum force, and the direction of the vacuum force point to the vacuum region. Any object rotates and radiates. Rotate bend radiate- centripetal, gravity produced, relative gravity; non gravity is the vacuum force. Gravity is centripetal, is a trend that the objects who attracted wants to Centripetal, or have been do Centripetal movement. Any object moves, so gravity makes the object curve movement, that is to say, the radiation range curve movement must be in the gravitational objects, gravity must be existed in non vacuum region, and make the object who is in the region of do curve movement (for example: The earth moves around the sun), or final attracted in the form gravitational objects, and keep relatively static with attract object. (for example: objects on the earth moves but can't reach the first cosmic speed).

  6. 30 CFR 75.601-1 - Short circuit protection; ratings and settings of circuit breakers.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... (amperes) 14 50 12 75 10 150 8 200 6 300 4 500 3 600 2 800 1 1,000 1/0 1,250 2/0 1,500 3/0 2,000 4/0 2,500... of circuit breakers. 75.601-1 Section 75.601-1 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR COAL MINE SAFETY AND HEALTH MANDATORY SAFETY STANDARDS-UNDERGROUND COAL MINES...

  7. INTESPACE's new thermal-vacuum test facility: SIMMER

    NASA Technical Reports Server (NTRS)

    Duprat, Raymond; Mouton, Andre

    1992-01-01

    The development of an European satellite market over the last 10 years, the industrialization of space applications, and the new requirements from satellite prime contractors have led INTESPACE to increase the test center's environmental testing capacities through the addition of a new thermal-vacuum test facility of impressive dimensions referred to as the SIMMER. The SIMMER is a simulator specifically created for the purpose of conducting acceptance tests of satellites and of large structures of the double launching ARIANE IV or half ARIANE V classes. The chamber is 8.3 meters long with a diameter of 10 meters. The conceptual design of a chamber in the horizontal plane and at floor level is in a view to simplify test preparation and to permit final electrical checks of the spacecraft in its actual test configuration prior to the closing of the chamber. The characteristics of the SIMMER complies with the requirements being currently defined in terms of thermal-vacuum tests: (1) thermal regulation (temperatures cycling between 100 K and 360 K); (2) clean vacuum (10(exp -6) mbar); (3) 600 measurement channels; and (4) 100 000 cleanliness class. The SIMMER is located in INTESPACE's space vehicle test complex in which a large variety of environmental test facilities are made available for having a whole test program completed under one and a same roof.

  8. CryoCart Restoration and Vacuum Pipe Construction

    NASA Technical Reports Server (NTRS)

    Chaidez, Mariana

    2016-01-01

    and connectors, system checks of the electrical system were ran to ensure that the system was working correctly. While completing system checks, the pressure transducers that were not functioning properly were also replaced and any issue with the wiring or signal was addressed. Once the electrical components were replaced, the restoration of the fluid system began. Parts of the tubing in the CryoCart had to be rebuild and often consisted of sizing, cutting, bending, filing, and sanding the tubing to prepare it to be flared. Many components had to be proof-tested to bring their certifications up to date, and several components had to be replaced. Various flex hoses, valves, and fittings were send to the Clean Lab because they were new, dirty, or had gone through proof-testing. Once they arrived from the cleaning lab they had to be put back to the system and leak checks and functional tests were conducted. In the Nitrogen system, the copper tubing located in the Oxygen cart was rebuild and Aerogel insulation was added to this section. A new gaseous nitrogen system was added to the CryoCart to purge the vacuum tube which will serve as the test chamber. Once the CryoCart was completed, construction of parts of the vacuum tube began. A flange was manufactured with welded fittings to hold the line of the vacuum pump as well as some extra fittings which will serve as extra inlets used to introduce fluid lines to the vacuum tube. Stress analysis was ran in this flange to ensure that it would not fail under vacuum conditions. The fluid lines leading from the air side of the vacuum to the test article were also constructed and added to the mount that had already been manufactured. Three different sets of tubing were constructed to accommodate the seven different RCS thruster and the main engine igniter that are going to be tested. Full electrical system checks were completed to ensure that all the wire harnesses and valves were functioning. Upon the completion of the Cryo

  9. Expanding sheath in a bounded plasma in the context of the post-arc phase of a vacuum arc

    NASA Astrophysics Data System (ADS)

    Sarrailh, P.; Garrigues, L.; Hagelaar, G. J. M.; Sandolache, G.; Rowe, S.; Jusselin, B.; Boeuf, J. P.

    2008-01-01

    A numerical model of sheath expansion and plasma decay in a bounded plasma subjected to a linearly increasing voltage has been developed. Numerical results obtained with a hybrid-MB model (Maxwell-Boltzmann electrons, particle ions and Poisson's equations) are compared with analytical theory and results from particle-in-cell (PIC) simulations. The hybrid-MB model is similar to models used for plasma immersion ion implantation except that plasma decay due to particle losses to the electrodes is taken into account. The comparisons with more accurate and much more time consuming PIC models show that the hybrid-MB model provides a very satisfactory description of the sheath expansion and plasma decay even for conditions where the grid spacing is much larger than the Debye length. The model is used for high plasma density conditions, corresponding to the post-arc phase of a vacuum arc circuit breaker where a vacuum gap is subject to a transient recovery voltage (TRV) after it has ceased to sustain a vacuum arc. The results show that the plasma sheath expansion is subsonic under these conditions, and that the plasma starts to decay exponentially after two rarefaction waves from the cathode and anode merge in the centre of the gap. A parametric study also shows the strong influence of the TRV rise rate and initial plasma density on the plasma decay time and on the ion current collected by each electrode. The effect of collisions between charged particles and metal atoms resulting for the electrode evaporation is also discussed.

  10. Extension of the shelf life of prawns (Penaeus japonicus) by vacuum packaging and high-pressure treatment.

    PubMed

    López-Caballero, M E; Pérez-Mateos, M; Borderías, J A; Montero, P

    2000-10-01

    The present study has investigated the application of high pressures (200 and 400 MPa) in chilled prawn tails, both conventionally stored (air) and vacuum packaged. Vacuum packaging and high-pressure treatment did extend the shelf life of the prawn samples, although it did affect muscle color very slightly, giving it a whiter appearance. The viable shelf life of 1 week for the air-stored samples was extended to 21 days in the vacuum-packed samples, 28 days in the samples treated at 200 MPa, and 35 days in the samples pressurized at 400 MPa. Vacuum packaging checked the onset of blackening, whereas high-pressure treatment aggravated the problem. From a microbiological point of view, batches conventionally stored reached about 6 log CFU/g or even higher at 14 days. Similar figures were reached in total number of bacteria in vacuum-packed samples and in pressurized at 200-MPa samples at 21 days. When samples were pressurized at 400 MPa, total numbers of bacteria were below 5.5 log CFU/g at 35 days of storage. Consequently, a combination of vacuum packaging and high-pressure treatment would appear to be beneficial in prolonging freshness and preventing spotting.

  11. Ethnopharmacological use of babassu (Orbignya phalerata Mart) in communities of babassu nut breakers in Maranhão, Brazil.

    PubMed

    Souza, Mércia H S L; Monteiro, Cristina A; Figueredo, Patricia M S; Nascimento, Flavia Raquel F; Guerra, Rosane N M

    2011-01-07

    Products derived from the palm tree Orbignya phalerata Mart, a species popularly known in Brazil as babassu, are used for the treatment of different diseases such as rheumatism, ulcers and inflammatory processes. The objective of this study was to perform a sociodemographic survey among communities of babassu nut breakers in the region of Médio Mearim, Esperantinópolis, Maranhão, Brazil, and to evaluate the frequency and main forms of therapeutic use of babassu products and subproducts. A semiquantitative method was used for the survey, with the application of semistructured interviews consisting of closed and semi-open questions. The data were analyzed using the SPSS 16.0 software for Windows (2007). The results showed that 82% of female nut breakers had a household income of less than US$ 280.00 and only 2% earned more than US$ 500.00. With respect to race and educational level, 61% of the interviewed women were mulattoes and 33% had a low educational level. The babassu-derived products most frequently used for medicinal purposes were the mesocarp, a residue called "borra", and oil. The mesocarp flour was used by 90% of nut breakers for the treatment of gastritis and inflammation and by 77% for leukorrhea. Babassu residue was mainly used for the treatment of wounds (60%) and the oil was used for woundhealing (16%) and leukorrhea (8%). In conclusion, the products derived from babassu are used for the treatment of gastritis, leukorrhea and wounds. In addition, most of the interviewed subjects apply these products topically. Copyright © 2010 Elsevier Ireland Ltd. All rights reserved.

  12. Experimental investigation on the initial expansion stage of vacuum arc on cup-shaped TMF contacts

    NASA Astrophysics Data System (ADS)

    Wang, Ting; Xiu, Shixin; Liu, Zixi; Zhang, Yanzhe; Feng, Dingyu

    2018-02-01

    Arc behavior and measures to control it directly affect the properties of vacuum circuit breakers. Nowadays, transverse magnetic field (TMF) contacts are widely used for medium voltages. A magnetic field perpendicular to the current direction between the TMF contacts makes the arc move, transmitting its energy to the whole contact and avoiding excessive local ablation. Previous research on TMF arc behavior concentrated mainly on the arc movement and less on the initial stage (from arc ignition to an unstable arc column). A significant amount of experiment results suggest that there is a short period of arc stagnation after ignition. The duration of this arc stagnation and the arc characteristics during this stage affect the subsequent arc motion and even the breaking property of interrupters. The present study is of the arc characteristics in the initial stage. Experiments were carried out in a demountable vacuum chamber with cup-shaped TMF contacts. Using a high-speed camera, both single-point arc ignition mode and multiple-point arc ignition (MPAI) mode were observed. The experimental data show that the probability of MPAI mode occurring is related to the arc current. The influences of arc-ignition mode, arc current, and contact diameter on the initial expansion process were investigated. In addition, simulations were performed to analyze the multiple arc expansion process mechanically. Based on the experimental phenomena and simulation results, the mechanism of the arc expansion motion was analyzed.

  13. MRO Sequence Checking Tool

    NASA Technical Reports Server (NTRS)

    Fisher, Forest; Gladden, Roy; Khanampornpan, Teerapat

    2008-01-01

    The MRO Sequence Checking Tool program, mro_check, automates significant portions of the MRO (Mars Reconnaissance Orbiter) sequence checking procedure. Though MRO has similar checks to the ODY s (Mars Odyssey) Mega Check tool, the checks needed for MRO are unique to the MRO spacecraft. The MRO sequence checking tool automates the majority of the sequence validation procedure and check lists that are used to validate the sequences generated by MRO MPST (mission planning and sequencing team). The tool performs more than 50 different checks on the sequence. The automation varies from summarizing data about the sequence needed for visual verification of the sequence, to performing automated checks on the sequence and providing a report for each step. To allow for the addition of new checks as needed, this tool is built in a modular fashion.

  14. The Effects of Check-In, Check-Up, Check-Out for Students with Moderate Intellectual Disability during On- and Off-Site Vocational Training

    ERIC Educational Resources Information Center

    Boden, Lauren J.; Jolivette, Kristine; Alberto, Paul A.

    2018-01-01

    Check-in/check-out is a secondary-tier intervention within the positive behavior interventions and supports framework. Check-in/check-out pairs the use of an adult mentor with a daily progress report to help students meet individualized behavioral goals. This study adds to the research base by examining the effects of check-in, check-up, check-out…

  15. Indian Vacuum Society: The Indian Vacuum Society

    NASA Astrophysics Data System (ADS)

    Saha, T. K.

    2008-03-01

    The Indian Vacuum Society (IVS) was established in 1970. It has over 800 members including many from Industry and R & D Institutions spread throughout India. The society has an active chapter at Kolkata. The society was formed with the main aim to promote, encourage and develop the growth of Vacuum Science, Techniques and Applications in India. In order to achieve this aim it has conducted a number of short term courses at graduate and technician levels on vacuum science and technology on topics ranging from low vacuum to ultrahigh vacuum So far it has conducted 39 such courses at different parts of the country and imparted training to more than 1200 persons in the field. Some of these courses were in-plant training courses conducted on the premises of the establishment and designed to take care of the special needs of the establishment. IVS also regularly conducts national and international seminars and symposia on vacuum science and technology with special emphasis on some theme related to applications of vacuum. A large number of delegates from all over India take part in the deliberations of such seminars and symposia and present their work. IVS also arranges technical visits to different industries and research institutes. The society also helped in the UNESCO sponsored post-graduate level courses in vacuum science, technology and applications conducted by Mumbai University. The society has also designed a certificate and diploma course for graduate level students studying vacuum science and technology and has submitted a syllabus to the academic council of the University of Mumbai for their approval, we hope that some colleges affiliated to the university will start this course from the coming academic year. IVS extended its support in standardizing many of the vacuum instruments and played a vital role in helping to set up a Regional Testing Centre along with BARC. As part of the development of vacuum education, the society arranges the participation of

  16. Check-In Check-Out + Social Skills: Enhancing the Effects of Check-In Check-Out for Students With Social Skill Deficits

    ERIC Educational Resources Information Center

    Ross, Scott W.; Sabey, Christian V.

    2015-01-01

    Check-In Check-Out is a Tier 2 intervention designed to reduce problem behavior and increase prosocial behavior. Although the intervention has demonstrated effects in several studies, few research efforts have considered how the intervention can be modified to support students with social skill deficits. Through a multiple baseline design across…

  17. 14 CFR 121.411 - Qualifications: Check airmen (airplane) and check airmen (simulator).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 3 2014-01-01 2014-01-01 false Qualifications: Check airmen (airplane) and... § 121.411 Qualifications: Check airmen (airplane) and check airmen (simulator). Link to an amendment... airman (airplane) is a person who is qualified, and permitted, to conduct flight checks or instruction in...

  18. 14 CFR 121.411 - Qualifications: Check airmen (airplane) and check airmen (simulator).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 3 2010-01-01 2010-01-01 false Qualifications: Check airmen (airplane) and... § 121.411 Qualifications: Check airmen (airplane) and check airmen (simulator). (a) For the purposes of this section and § 121.413: (1) A check airman (airplane) is a person who is qualified, and permitted...

  19. 14 CFR 121.411 - Qualifications: Check airmen (airplane) and check airmen (simulator).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 14 Aeronautics and Space 3 2012-01-01 2012-01-01 false Qualifications: Check airmen (airplane) and... § 121.411 Qualifications: Check airmen (airplane) and check airmen (simulator). (a) For the purposes of this section and § 121.413: (1) A check airman (airplane) is a person who is qualified, and permitted...

  20. 14 CFR 121.411 - Qualifications: Check airmen (airplane) and check airmen (simulator).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 3 2011-01-01 2011-01-01 false Qualifications: Check airmen (airplane) and... § 121.411 Qualifications: Check airmen (airplane) and check airmen (simulator). (a) For the purposes of this section and § 121.413: (1) A check airman (airplane) is a person who is qualified, and permitted...

  1. 14 CFR 121.411 - Qualifications: Check airmen (airplane) and check airmen (simulator).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 14 Aeronautics and Space 3 2013-01-01 2013-01-01 false Qualifications: Check airmen (airplane) and... § 121.411 Qualifications: Check airmen (airplane) and check airmen (simulator). (a) For the purposes of this section and § 121.413: (1) A check airman (airplane) is a person who is qualified, and permitted...

  2. Development of a multiperspective optical measuring system for investigating decaying switching arcs at the nozzle exit of circuit breakers.

    PubMed

    Stoffels, M; Simon, S; Nikolic, P G; Stoller, P; Carstensen, J

    2017-03-01

    High-voltage gas circuit breakers, which play an important role in the operation and protection of the power grid, function by drawing an arc between two contacts and then extinguishing it by cooling it using a transonic gas flow. Improving the design of circuit breakers requires an understanding of the physical processes in the interruption of the arc, particularly during the zero crossing of the alternating current (the point in time when the arc can be interrupted). Most diagnostic techniques currently available focus on measurement of current, voltage, and gas pressure at defined locations. However, these integral properties do not give sufficient insight into the arc physics. To understand the current interruption process, spatially resolved information about the density, temperature, and conductivity of the arc and surrounding gas flow is needed. Owing to the three-dimensional, unstable nature of the arc in a circuit breaker, especially near current zero, a spatially resolved, tomographic diagnostic technique is required that is capable of freezing the rapid, transient behavior and that is insensitive to the vibrations and electromagnetic interference inherent in the interruption of short-circuit current arcs. Here a new measurement system, based on background-oriented schlieren (BOS) imaging, is presented and assessed. BOS imaging using four beams consisting of white light sources, a background pattern, imaging optics, and a camera permits measurement of the line-of-sight integrated refractive index. Tomographic reconstruction is used to determine the three-dimensional, spatially resolved index of refraction distribution that in turn is used to calculate the density. The quantitative accuracy of a single beam of the BOS setup is verified by using a calibration lens with a known focal length. The ability of the tomographic reconstruction to detect asymmetric features of the arc and surrounding gas flow is assessed semiquantitatively using a nozzle that

  3. Effects of vigorous mixing of blood vacuum tubes on laboratory test results.

    PubMed

    Lima-Oliveira, Gabriel; Lippi, Giuseppe; Salvagno, Gian Luca; Montagnana, Martina; Gelati, Matteo; Volanski, Waldemar; Boritiza, Katia Cristina; Picheth, Geraldo; Guidi, Gian Cesare

    2013-02-01

    To evaluate the effect of tubes mixing (gentle vs. vigorous) on diagnostic blood specimens collected in vacuum tube systems by venipuncture. Blood was collected for routine coagulation, immunochemistry and hematological testing from one hundred volunteers into six vacuum tubes: two 3.6 mL vacuum tubes containing 0.4 mL of buffered sodium citrate (9NC) 0.109 mol/L: 3.2 W/V%; two 3.5 mL vacuum tubes with clot activator and gel separator; and two 3.0 mL vacuum tubes containing 5.9 mg K(2)EDTA (Terumo Europe, Belgium). Immediately after the venipuncture all vacuum tubes (each of one additive type) were processed through two different procedures: i) Standard: blood specimens in K(2)EDTA- or sodium citrate-vacuum tubes were gently inverted five times whereas the specimens in tubes with clot activator and gel separator were gently inverted ten times, as recommended by the manufacturer; ii) Vigorous mix: all blood specimens were shaken up vigorously during 3-5s independently of the additive type inside the tubes. The significance of the differences between samples was assessed by Student's t-test or Wilcoxon ranked-pairs test after checking for normality. The level of statistical significance was set at P<0.05. No significant difference (P<0.05) was detected between the procedures for all tested parameters. Surprisingly only a visual alteration (presence of foam on the top) was shown by all the tubes mixed vigorously before centrifugation (Fig. 1 A, B and C). Moreover the serum tubes from vigorous mixing procedure shows a "blood ring" on the tube top after stopper removal (Fig. 1 D). Our results drop out a paradigm suggesting that the incorrect primary blood tubes mixing promotes laboratory variability. We suggest that similar evaluation should be done using other brands of vacuum tubes by each laboratory manager. Copyright © 2012 The Canadian Society of Clinical Chemists. Published by Elsevier Inc. All rights reserved.

  4. Vacuum mechatronics

    NASA Technical Reports Server (NTRS)

    Hackwood, Susan; Belinski, Steven E.; Beni, Gerardo

    1989-01-01

    The discipline of vacuum mechatronics is defined as the design and development of vacuum-compatible computer-controlled mechanisms for manipulating, sensing and testing in a vacuum environment. The importance of vacuum mechatronics is growing with an increased application of vacuum in space studies and in manufacturing for material processing, medicine, microelectronics, emission studies, lyophylisation, freeze drying and packaging. The quickly developing field of vacuum mechatronics will also be the driving force for the realization of an advanced era of totally enclosed clean manufacturing cells. High technology manufacturing has increasingly demanding requirements for precision manipulation, in situ process monitoring and contamination-free environments. To remove the contamination problems associated with human workers, the tendency in many manufacturing processes is to move towards total automation. This will become a requirement in the near future for e.g., microelectronics manufacturing. Automation in ultra-clean manufacturing environments is evolving into the concept of self-contained and fully enclosed manufacturing. A Self Contained Automated Robotic Factory (SCARF) is being developed as a flexible research facility for totally enclosed manufacturing. The construction and successful operation of a SCARF will provide a novel, flexible, self-contained, clean, vacuum manufacturing environment. SCARF also requires very high reliability and intelligent control. The trends in vacuum mechatronics and some of the key research issues are reviewed.

  5. Chelation: A Fundamental Mechanism of Action of AGE Inhibitors, AGE Breakers, and Other Inhibitors of Diabetes Complications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Nagai, Rhoji; Murray, David B.; Metz, Thomas O.

    2012-03-01

    Advanced glycation or glycoxidation end-products (AGE) increase in tissue proteins with age, and their rate of accumulation is increased in diabetes, nephropathy and inflammatory diseases. AGE inhibitors include a range of compounds that are proposed to act by trapping carbonyl and dicarbonyl intermediates in AGE formation. However, some among the newer generation of AGE inhibitors lack reactive functional groups that would trap reaction intermediates, indicating an alternative mechanism of action. We propose that AGE inhibitors function primarily as chelators, inhibiting metal-catalyzed oxidation reactions. The AGE-inhibitory activity of angiotensin-converting enzyme inhibitors and angiotensin receptor blockers is also consistent with their chelatingmore » activity. Finally, compounds described as AGE breakers, or their hydrolysis products, also have strong chelating activity, suggesting that these compounds also act through their chelating activity. We conclude that chelation is the common, and perhaps the primary, mechanism of action of AGE inhibitors and breakers, and that chronic, mild chelation therapy should prove useful in treatment of diabetes and age-related diseases characterized by oxidative stress, inflammation and increased chemical modification of tissue proteins by advanced glycoxidation and lipoxidation end-products.« less

  6. Study of switching electric circuits with DC hybrid breaker, one stage

    NASA Astrophysics Data System (ADS)

    Niculescu, T.; Marcu, M.; Popescu, F. G.

    2016-06-01

    The paper presents a method of extinguishing the electric arc that occurs between the contacts of direct current breakers. The method consists of using an LC type extinguishing group to be optimally sized. From this point of view is presented a theoretical approach to the phenomena that occurs immediately after disconnecting the load and the specific diagrams are drawn. Using these, the elements extinguishing group we can choose. At the second part of the paper there is presented an analyses of the circuit switching process by decomposing the process in particular time sequences. For every time interval there was conceived a numerical simulation model in MATLAB-SIMULINK medium which integrates the characteristic differential equation and plots the capacitor voltage variation diagram and the circuit dumping current diagram.

  7. Study on the Mathematical Model of Dielectric Recovery Characteristics in High Voltage SF6 Circuit Breaker

    NASA Astrophysics Data System (ADS)

    Lin, Xin; Wang, Feiming; Xu, Jianyuan; Xia, Yalong; Liu, Weidong

    2016-03-01

    According to the stream theory, this paper proposes a mathematical model of the dielectric recovery characteristic based on the two-temperature ionization equilibrium equation. Taking the dynamic variation of charged particle's ionization and attachment into account, this model can be used in collaboration with the Coulomb collision model, which gives the relationship of the heavy particle temperature and electron temperature to calculate the electron density and temperature under different pressure and electric field conditions, so as to deliver the breakdown electric field strength under different pressure conditions. Meanwhile an experiment loop of the circuit breaker has been built to measure the breakdown voltage. It is shown that calculated results are in conformity with experiment results on the whole while results based on the stream criterion are larger than experiment results. This indicates that the mathematical model proposed here is more accurate for calculating the dielectric recovery characteristic, it is derived from the stream model with some improvement and refinement and has great significance for increasing the simulation accuracy of circuit breaker's interruption characteristic. supported by Science and Technology Project of State Grid Corporation of China (No. GY17201200063), National Natural Science Foundation of China (No. 51277123), Basic Research Project of Liaoning Key Laboratory of Education Department (LZ2015055)

  8. Natural vacuum electronics

    NASA Technical Reports Server (NTRS)

    Leggett, Nickolaus

    1990-01-01

    The ambient natural vacuum of space is proposed as a basis for electron valves. Each valve is an electron controlling structure similiar to a vacuum tube that is operated without a vacuum sustaining envelope. The natural vacuum electron valves discussed offer a viable substitute for solid state devices. The natural vacuum valve is highly resistant to ionizing radiation, system generated electromagnetic pulse, current transients, and direct exposure to space conditions.

  9. Check valve

    DOEpatents

    Upton, Hubert Allen; Garcia, Pablo

    1999-08-24

    A check valve for use in a GDCS of a nuclear reactor and having a motor driven disk including a rotatable armature for rotating the check valve disk over its entire range of motion is described. In one embodiment, the check valve includes a valve body having a coolant flow channel extending therethrough. The coolant flow channel includes an inlet end and an outlet end. A valve body seat is located on an inner surface of the valve body. The check valve further includes a disk assembly, sometimes referred to as the motor driven disc, having a counterweight and a disk shaped valve. The disk valve includes a disk base having a seat for seating with the valve body seat. The disk assembly further includes a first hinge pin member which extends at least partially through the disk assembly and is engaged to the disk. The disk valve is rotatable relative to the first hinge pin member. The check valve also includes a motor having a stator frame with a stator bore therein. An armature is rotatably positioned within the stator bore and the armature is coupled to the disk valve to cause the disk valve to rotate about its full range of motion.

  10. Check valve

    DOEpatents

    Upton, H.A.; Garcia, P.

    1999-08-24

    A check valve for use in a GDCS of a nuclear reactor and having a motor driven disk including a rotatable armature for rotating the check valve disk over its entire range of motion is described. In one embodiment, the check valve includes a valve body having a coolant flow channel extending therethrough. The coolant flow channel includes an inlet end and an outlet end. A valve body seat is located on an inner surface of the valve body. The check valve further includes a disk assembly, sometimes referred to as the motor driven disc, having a counterweight and a disk shaped valve. The disk valve includes a disk base having a seat for seating with the valve body seat. The disk assembly further includes a first hinge pin member which extends at least partially through the disk assembly and is engaged to the disk. The disk valve is rotatable relative to the first hinge pin member. The check valve also includes a motor having a stator frame with a stator bore therein. An armature is rotatably positioned within the stator bore and the armature is coupled to the disk valve to cause the disk valve to rotate about its full range of motion. 5 figs.

  11. VACUUM TRAP

    DOEpatents

    Gordon, H.S.

    1959-09-15

    An improved adsorption vacuum trap for use in vacuum systems was designed. The distinguishing feature is the placement of a plurality of torsionally deformed metallic fins within a vacuum jacket extending from the walls to the central axis so that substantially all gas molecules pass through the jacket will impinge upon the fin surfaces. T fins are heated by direct metallic conduction, thereby ol taining a uniform temperature at the adeorbing surfaces so that essentially all of the condensible impurities from the evacuating gas are removed from the vacuum system.

  12. 30 CFR 77.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... pilot check wires. 77.902-2 Section 77.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires shall be approved by the Secretary only after it has been determined that the system...

  13. 30 CFR 77.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... pilot check wires. 77.902-2 Section 77.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires shall be approved by the Secretary only after it has been determined that the system...

  14. 30 CFR 77.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... pilot check wires. 77.902-2 Section 77.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires shall be approved by the Secretary only after it has been determined that the system...

  15. 30 CFR 77.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... pilot check wires. 77.902-2 Section 77.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires shall be approved by the Secretary only after it has been determined that the system...

  16. 30 CFR 77.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... pilot check wires. 77.902-2 Section 77.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... Approved ground check systems not employing pilot check wires. Ground check systems not employing pilot check wires shall be approved by the Secretary only after it has been determined that the system...

  17. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Approved ground check systems not employing pilot check wires. 75.902-2 Section 75.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... employing pilot check wires. Ground check systems not employing pilot check wires will be approved only if...

  18. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Approved ground check systems not employing pilot check wires. 75.902-2 Section 75.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... employing pilot check wires. Ground check systems not employing pilot check wires will be approved only if...

  19. Double checking: a second look

    PubMed Central

    Chreim, Samia; Forster, Alan

    2015-01-01

    Abstract Rationale, aims and objectives Double checking is a standard practice in many areas of health care, notwithstanding the lack of evidence supporting its efficacy. We ask in this study: ‘How do front line practitioners conceptualize double checking? What are the weaknesses of double checking? What alternate views of double checking could render it a more robust process?’ Method This is part of a larger qualitative study based on 85 semi‐structured interviews of health care practitioners in general internal medicine and obstetrics and neonatology; thematic analysis of the transcribed interviews was undertaken. Inductive and deductive themes are reported. Results Weaknesses in the double checking process include inconsistent conceptualization of double checking, double (or more) checking as a costly and time‐consuming procedure, double checking trusted as an accepted and stand‐alone process, and double checking as preventing reporting of near misses. Alternate views of double checking that would render it a more robust process include recognizing that double checking requires training and a dedicated environment, Introducing automated double checking, and expanding double checking beyond error detection. These results are linked with the concepts of collective efficiency thoroughness trade off (ETTO), an in‐family approach, and resilience. Conclusion(s) Double checking deserves more questioning, as there are limitations to the process. Practitioners could view double checking through alternate lenses, and thus help strengthen this ubiquitous practice that is rarely challenged. PMID:26568537

  20. 14 CFR 91.1089 - Qualifications: Check pilots (aircraft) and check pilots (simulator).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 14 Aeronautics and Space 2 2011-01-01 2011-01-01 false Qualifications: Check pilots (aircraft) and check pilots (simulator). 91.1089 Section 91.1089 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... RULES Fractional Ownership Operations Program Management § 91.1089 Qualifications: Check pilots...

  1. 14 CFR 91.1089 - Qualifications: Check pilots (aircraft) and check pilots (simulator).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 14 Aeronautics and Space 2 2010-01-01 2010-01-01 false Qualifications: Check pilots (aircraft) and check pilots (simulator). 91.1089 Section 91.1089 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION... RULES Fractional Ownership Operations Program Management § 91.1089 Qualifications: Check pilots...

  2. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... pilot check wires. 75.902-2 Section 75.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... employing pilot check wires. Ground check systems not employing pilot check wires will be approved only if... ground continuity is broken. ...

  3. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... pilot check wires. 75.902-2 Section 75.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... employing pilot check wires. Ground check systems not employing pilot check wires will be approved only if... ground continuity is broken. ...

  4. 30 CFR 75.902-2 - Approved ground check systems not employing pilot check wires.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... pilot check wires. 75.902-2 Section 75.902-2 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION... employing pilot check wires. Ground check systems not employing pilot check wires will be approved only if... ground continuity is broken. ...

  5. Comparison of vacuum and non-vacuum urine tubes for urinary sediment analysis.

    PubMed

    Topcuoglu, Canan; Sezer, Sevilay; Kosem, Arzu; Ercan, Mujgan; Turhan, Turan

    2017-12-01

    Urine collection systems with aspiration system for vacuum tubes are becoming increasingly common for urinalysis, especially for microscopic examination of the urine. In this study, we aimed to examine whether vacuum aspiration of the urine sample has any adverse effect on sediment analysis by comparing results from vacuum and non-vacuum urine tubes. The study included totally 213 urine samples obtained from inpatients and outpatients in our hospital. Urine samples were collected to containers with aspiration system for vacuum tubes. Each sample was aliquoted to both vacuum and non-vacuum urine tubes. Urinary sediment analysis was performed using manual microscope. Results were evaluated using chi-square test. Comparison of the sediment analysis results from vacuum and non-vacuum urine tubes showed that results were highly concordant for erythrocyte, leukocyte and epithelial cells (gamma values 1, 0.997, and 0.994, respectively; p < .001). Results were also concordant for urinary casts, crystals and yeast (kappa values 0.815, 0.945 and 1, respectively; p < .001). The results show that in urinary sediment analysis, vacuum aspiration has no adverse effect on the cellular components except on casts.

  6. Feasibility analysis of a novel hybrid-type superconducting circuit breaker in multi-terminal HVDC networks

    NASA Astrophysics Data System (ADS)

    Khan, Umer Amir; Lee, Jong-Geon; Seo, In-Jin; Amir, Faisal; Lee, Bang-Wook

    2015-11-01

    Voltage source converter-based HVDC systems (VSC-HVDC) are a better alternative than conventional thyristor-based HVDC systems, especially for developing multi-terminal HVDC systems (MTDC). However, one of the key obstacles in developing MTDC is the absence of an adequate protection system that can quickly detect faults, locate the faulty line and trip the HVDC circuit breakers (DCCBs) to interrupt the DC fault current. In this paper, a novel hybrid-type superconducting circuit breaker (SDCCB) is proposed and feasibility analyses of its application in MTDC are presented. The SDCCB has a superconducting fault current limiter (SFCL) located in the main current path to limit fault currents until the final trip signal is received. After the trip signal the IGBT located in the main line commutates the current into a parallel line where DC current is forced to zero by the combination of IGBTs and surge arresters. Fault simulations for three-, four- and five-terminal MTDC were performed and SDCCB performance was evaluated in these MTDC. Passive current limitation by SFCL caused a significant reduction of fault current interruption stress in the SDCCB. It was observed that the DC current could change direction in MTDC after a fault and the SDCCB was modified to break the DC current in both the forward and reverse directions. The simulation results suggest that the proposed SDCCB could successfully suppress the DC fault current, cause a timely interruption, and isolate the faulty HVDC line in MTDC.

  7. 14 CFR 135.337 - Qualifications: Check airmen (aircraft) and check airmen (simulator).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... who is qualified to conduct flight checks in an aircraft, in a flight simulator, or in a flight... to conduct flight checks, but only in a flight simulator, in a flight training device, or both, for a... the 12-month preceding the performance of any check airman duty in a flight simulator; or (2...

  8. 14 CFR 135.337 - Qualifications: Check airmen (aircraft) and check airmen (simulator).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... who is qualified to conduct flight checks in an aircraft, in a flight simulator, or in a flight... to conduct flight checks, but only in a flight simulator, in a flight training device, or both, for a... the 12-month preceding the performance of any check airman duty in a flight simulator; or (2...

  9. 14 CFR 135.337 - Qualifications: Check airmen (aircraft) and check airmen (simulator).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... who is qualified to conduct flight checks in an aircraft, in a flight simulator, or in a flight... to conduct flight checks, but only in a flight simulator, in a flight training device, or both, for a... the 12-month preceding the performance of any check airman duty in a flight simulator; or (2...

  10. 14 CFR 135.337 - Qualifications: Check airmen (aircraft) and check airmen (simulator).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... who is qualified to conduct flight checks in an aircraft, in a flight simulator, or in a flight... to conduct flight checks, but only in a flight simulator, in a flight training device, or both, for a... the 12-month preceding the performance of any check airman duty in a flight simulator; or (2...

  11. 14 CFR 91.1093 - Initial and transition training and checking: Check pilots (aircraft), check pilots (simulator).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... observation check may be accomplished in part or in full in an aircraft, in a flight simulator, or in a flight... accomplished in full or in part in flight, in a flight simulator, or in a flight training device, as appropriate. (g) The initial and transition flight training for a check pilot (simulator) must include the...

  12. 14 CFR 91.1093 - Initial and transition training and checking: Check pilots (aircraft), check pilots (simulator).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... observation check may be accomplished in part or in full in an aircraft, in a flight simulator, or in a flight... accomplished in full or in part in flight, in a flight simulator, or in a flight training device, as appropriate. (g) The initial and transition flight training for a check pilot (simulator) must include the...

  13. 14 CFR 91.1093 - Initial and transition training and checking: Check pilots (aircraft), check pilots (simulator).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... observation check may be accomplished in part or in full in an aircraft, in a flight simulator, or in a flight... accomplished in full or in part in flight, in a flight simulator, or in a flight training device, as appropriate. (g) The initial and transition flight training for a check pilot (simulator) must include the...

  14. 14 CFR 91.1093 - Initial and transition training and checking: Check pilots (aircraft), check pilots (simulator).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... observation check may be accomplished in part or in full in an aircraft, in a flight simulator, or in a flight... accomplished in full or in part in flight, in a flight simulator, or in a flight training device, as appropriate. (g) The initial and transition flight training for a check pilot (simulator) must include the...

  15. 14 CFR 91.1093 - Initial and transition training and checking: Check pilots (aircraft), check pilots (simulator).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... observation check may be accomplished in part or in full in an aircraft, in a flight simulator, or in a flight... accomplished in full or in part in flight, in a flight simulator, or in a flight training device, as appropriate. (g) The initial and transition flight training for a check pilot (simulator) must include the...

  16. 49 CFR 570.56 - Vacuum brake assist unit and vacuum brake system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... The following requirements apply to vehicles with vacuum brake assist units and vacuum brake systems. (a) Vacuum brake assist unit integrity. The vacuum brake assist unit shall demonstrate integrity as... maintained on the pedal. (1) Inspection procedure. Stop the engine and apply service brake several times to...

  17. Demonstrations with a Vacuum: Old Demonstrations for New Vacuum Pumps.

    ERIC Educational Resources Information Center

    Greenslade, Thomas B., Jr.

    1989-01-01

    Explains mechanisms of 19th-century vacuum pumps. Describes demonstrations using the pump including guinea and feather tube, aurora tube, electric egg, Gassiots cascade, air mill, bell in vacuum, density and buoyancy of air, fountain in vacuum, mercury shower, palm and bladder glasses, Bacchus demonstration, pneumatic man-lifter, and Magdeburg…

  18. 46 CFR 111.105-31 - Flammable or combustible cargo with a flashpoint below 60 °C (140 °F), carriers of liquid-sulphur...

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... be a lockable circuit breaker or lockable switch that disconnects power to the motor. (e) Cargo Tanks.../vacuum valves with an unlimited height; or (4) Within 10 meters (33 ft) of vent outlets for free flow of...

  19. 46 CFR 111.105-31 - Flammable or combustible cargo with a flashpoint below 60 °C (140 °F), carriers of liquid-sulphur...

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... be a lockable circuit breaker or lockable switch that disconnects power to the motor. (e) Cargo Tanks.../vacuum valves with an unlimited height; or (4) Within 10 meters (33 ft) of vent outlets for free flow of...

  20. 46 CFR 111.105-31 - Flammable or combustible cargo with a flashpoint below 60 °C (140 °F), carriers of liquid-sulphur...

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... be a lockable circuit breaker or lockable switch that disconnects power to the motor. (e) Cargo Tanks.../vacuum valves with an unlimited height; or (4) Within 10 meters (33 ft) of vent outlets for free flow of...

  1. The Impact Of Surface Shape Of Chip-Breaker On Machined Surface

    NASA Astrophysics Data System (ADS)

    Šajgalík, Michal; Czán, Andrej; Martinček, Juraj; Varga, Daniel; Hemžský, Pavel; Pitela, David

    2015-12-01

    Machined surface is one of the most used indicators of workpiece quality. But machined surface is influenced by several factors such as cutting parameters, cutting material, shape of cutting tool or cutting insert, micro-structure of machined material and other known as technological parameters. By improving of these parameters, we can improve machined surface. In the machining, there is important to identify the characteristics of main product of these processes - workpiece, but also the byproduct - the chip. Size and shape of chip has impact on lifetime of cutting tools and its inappropriate form can influence the machine functionality and lifetime, too. This article deals with elimination of long chip created when machining of shaft in automotive industry and with impact of shape of chip-breaker on shape of chip in various cutting conditions based on production requirements.

  2. Improved Vacuum Bazooka

    NASA Astrophysics Data System (ADS)

    Cockman, John

    2003-04-01

    This apparatus is a modification to the well-known "vacuum bazooka" (PIRA 2B30.70). My vacuum bazooka is easy to construct and demonstrate, requires no precise fittings, foil, or vacuum grease, and propels ping-pong balls at a tremendous velocity!

  3. The Classical Vacuum.

    ERIC Educational Resources Information Center

    Boyer, Timothy H.

    1985-01-01

    The classical vacuum of physics is not empty, but contains a distinctive pattern of electromagnetic fields. Discovery of the vacuum, thermal spectrum, classical electron theory, zero-point spectrum, and effects of acceleration are discussed. Connection between thermal radiation and the classical vacuum reveals unexpected unity in the laws of…

  4. Electroweak vacuum instability and renormalized Higgs field vacuum fluctuations in the inflationary universe

    NASA Astrophysics Data System (ADS)

    Kohri, Kazunori; Matsui, Hiroki

    2017-08-01

    In this work, we investigated the electroweak vacuum instability during or after inflation. In the inflationary Universe, i.e., de Sitter space, the vacuum field fluctuations < δ phi 2 > enlarge in proportion to the Hubble scale H2. Therefore, the large inflationary vacuum fluctuations of the Higgs field < δ phi 2 > are potentially catastrophic to trigger the vacuum transition to the negative-energy Planck-scale vacuum state and cause an immediate collapse of the Universe. However, the vacuum field fluctuations < δ phi 2 >, i.e., the vacuum expectation values have an ultraviolet divergence, and therefore a renormalization is necessary to estimate the physical effects of the vacuum transition. Thus, in this paper, we revisit the electroweak vacuum instability from the perspective of quantum field theory (QFT) in curved space-time, and discuss the dynamical behavior of the homogeneous Higgs field phi determined by the effective potential V eff( phi ) in curved space-time and the renormalized vacuum fluctuations < δ phi 2 >ren via adiabatic regularization and point-splitting regularization. We simply suppose that the Higgs field only couples the gravity via the non-minimal Higgs-gravity coupling ξ(μ). In this scenario, the electroweak vacuum stability is inevitably threatened by the dynamical behavior of the homogeneous Higgs field phi, or the formations of AdS domains or bubbles unless the Hubble scale is small enough H< ΛI .

  5. Check-Up Checklist: Things to Do Before Your Next Check-Up

    MedlinePlus

    ... Halloween Prom Tips Spring Break Valentine Tips Winter Holiday Tips 12 Ways Holiday Song Healthy Living Check-Ups are Important Check- ... Test Wash Hands Stay Warm Have a Healthy Holiday Don’t Drink and Drive Widgets Healthy People ...

  6. Interface Circuits for Self-Checking Microprocessors

    NASA Technical Reports Server (NTRS)

    Rennels, D. A.; Chandramouli, R.

    1986-01-01

    Fault-tolerant-microcomputer concept based on enhancing "simple" computer with redundancy and self-checking logic circuits detect hardware faults. Interface and checking logic and redundant processors confer on 16-bit microcomputer ability to check itself for hardware faults. Checking circuitry also checks itself. Concept of self-checking complementary pairs (SCCP's) employed throughout ICL unit.

  7. Quantification of rectifications for the Northwestern University Flexible Sub-Ischial Vacuum Socket.

    PubMed

    Fatone, Stefania; Johnson, William Brett; Tran, Lilly; Tucker, Kerice; Mowrer, Christofer; Caldwell, Ryan

    2017-06-01

    The fit and function of a prosthetic socket depend on the prosthetist's ability to design the socket's shape to distribute load comfortably over the residual limb. We recently developed a sub-ischial socket for persons with transfemoral amputation: the Northwestern University Flexible Sub-Ischial Vacuum Socket. This study aimed to quantify the rectifications required to fit the Northwestern University Flexible Sub-Ischial Vacuum Socket to teach the technique to prosthetists as well as provide a computer-aided design-computer-aided manufacturing option. Development project. A program was used to align scans of unrectified and rectified negative molds and calculate shape change as a result of rectification. Averaged rectifications were used to create a socket template, which was shared with a central fabrication facility engaged in provision of Northwestern University Flexible Sub-Ischial Vacuum Sockets to early clinical adopters. Feedback regarding quality of fitting was obtained. Rectification maps created from 30 cast pairs of successfully fit Northwestern University Flexible Sub-Ischial Vacuum Sockets confirmed that material was primarily removed from the positive mold in the proximal-lateral and posterior regions. The template was used to fabricate check sockets for 15 persons with transfemoral amputation. Feedback suggested that the template provided a reasonable initial fit with only minor adjustments. Rectification maps and template were used to facilitate teaching and central fabrication of the Northwestern University Flexible Sub-Ischial Vacuum Socket. Minor issues with quality of initial fit achieved with the template may be due to inability to adjust the template to patient characteristics (e.g. tissue type, limb shape) and/or the degree to which it represented a fully mature version of the technique. Clinical relevance Rectification maps help communicate an important step in the fabrication of the Northwestern University Flexible Sub-Ischial Vacuum

  8. Germanium detector vacuum encapsulation

    NASA Technical Reports Server (NTRS)

    Madden, N. W.; Malone, D. F.; Pehl, R. H.; Cork, C. P.; Luke, P. N.; Landis, D. A.; Pollard, M. J.

    1991-01-01

    This paper describes an encapsulation technology that should significantly improve the viability of germanium gamma-ray detectors for a number of important applications. A specialized vacuum chamber has been constructed in which the detector and the encapsulating module are processed in high vacuum. Very high vacuum conductance is achieved within the valveless encapsulating module. The detector module is then sealed without breaking the chamber vacuum. The details of the vacuum chamber, valveless module, processing, and sealing method are presented.

  9. Fundamental properties of high-temperature SF6 mixed with CO2 as a replacement for SF6 in high-voltage circuit breakers

    NASA Astrophysics Data System (ADS)

    Wang, Weizong; Rong, Mingzhe; Wu, Yi; Yan, Joseph D.

    2014-06-01

    Sulfur hexafluoride (SF6) gas, used widely in high-voltage circuit breakers, can produce a remarkable greenhouse effect if released into the atmosphere. Fundamental properties of SF6 mixed with CO2 at high temperatures are presented in this paper, considering their reduction of adverse impact on the environment as a replacement for pure SF6 in high-voltage circuit breakers: to the knowledge of the authors, related data have not been reported in the literature. The species composition and thermodynamic properties (mass density, enthalpy and specific heat at constant pressure) are determined by the method of Gibbs free energy minimization, using standard thermodynamic tables. The transport properties, including viscosity, thermal conductivity and electrical conductivity, are evaluated by using the Chapman-Enskog method expanded up to the third-order approximation (second order for viscosity). Particular attention is paid to the establishment of a collision integral database related to a reacting species system containing basic elements of carbon, oxygen and sulfur as well as fluoride by the use of recent cross sections or interaction potentials available in the literature. The calculations, which assume a local thermodynamic equilibrium, are performed in the temperature range 300 to 30 000 K for different pressures between 0.01 and 1.6 MPa. The results obtained are compared to those of previously published studies, and the reasons for discrepancies are analysed. An evaluation of the current interruption performance by adding CO2 to SF6 is discussed from a microscopic point of view. The results provide reliable reference data for the simulation of switching arcs in high-voltage circuit breakers in SF6-CO2 mixtures.

  10. Electroweak vacuum instability and renormalized Higgs field vacuum fluctuations in the inflationary universe

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kohri, Kazunori; Matsui, Hiroki, E-mail: kohri@post.kek.jp, E-mail: matshiro@post.kek.jp

    In this work, we investigated the electroweak vacuum instability during or after inflation. In the inflationary Universe, i.e., de Sitter space, the vacuum field fluctuations < δ φ {sup 2} > enlarge in proportion to the Hubble scale H {sup 2}. Therefore, the large inflationary vacuum fluctuations of the Higgs field < δ φ {sup 2} > are potentially catastrophic to trigger the vacuum transition to the negative-energy Planck-scale vacuum state and cause an immediate collapse of the Universe. However, the vacuum field fluctuations < δ φ {sup 2} >, i.e., the vacuum expectation values have an ultraviolet divergence, andmore » therefore a renormalization is necessary to estimate the physical effects of the vacuum transition. Thus, in this paper, we revisit the electroweak vacuum instability from the perspective of quantum field theory (QFT) in curved space-time, and discuss the dynamical behavior of the homogeneous Higgs field φ determined by the effective potential V {sub eff}( φ ) in curved space-time and the renormalized vacuum fluctuations < δ φ {sup 2} >{sub ren} via adiabatic regularization and point-splitting regularization. We simply suppose that the Higgs field only couples the gravity via the non-minimal Higgs-gravity coupling ξ(μ). In this scenario, the electroweak vacuum stability is inevitably threatened by the dynamical behavior of the homogeneous Higgs field φ, or the formations of AdS domains or bubbles unless the Hubble scale is small enough H < Λ {sub I} .« less

  11. 32 CFR Attachment A to Subpart B... - Standard A-National Agency Check With Local Agency Checks and Credit Check (NACLC)

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... documentation, if not completed in any previous investigation; a check of Bureau of Vital Statistics records when any discrepancy is found to exist. (5) Local Agency Checks: As a minimum, all investigations will...

  12. 32 CFR Attachment A to Subpart B... - Standard A-National Agency Check With Local Agency Checks and Credit Check (NACLC)

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... documentation, if not completed in any previous investigation; a check of Bureau of Vital Statistics records when any discrepancy is found to exist. (5) Local Agency Checks: As a minimum, all investigations will...

  13. 32 CFR Attachment A to Subpart B... - Standard A-National Agency Check With Local Agency Checks and Credit Check (NACLC)

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... documentation, if not completed in any previous investigation; a check of Bureau of Vital Statistics records when any discrepancy is found to exist. (5) Local Agency Checks: As a minimum, all investigations will...

  14. 32 CFR Attachment A to Subpart B... - Standard A-National Agency Check With Local Agency Checks and Credit Check (NACLC)

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... documentation, if not completed in any previous investigation; a check of Bureau of Vital Statistics records when any discrepancy is found to exist. (5) Local Agency Checks: As a minimum, all investigations will...

  15. 32 CFR Attachment A to Subpart B... - Standard A-National Agency Check With Local Agency Checks and Credit Check (NACLC)

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... documentation, if not completed in any previous investigation; a check of Bureau of Vital Statistics records when any discrepancy is found to exist. (5) Local Agency Checks: As a minimum, all investigations will...

  16. Critically safe volume vacuum pickup for use in wet or dry cleanup of radioactive enclosures

    DOEpatents

    Zeren, J.D.

    1993-12-28

    A physical compact vacuum pickup device of critically safe volume and geometric shape is provided for use in radioactive enclosures, such as a small glove box, to facilitate manual cleanup of either wet or dry radioactive material. The device is constructed and arranged so as to remain safe when filled to capacity with plutonium-239 oxide. Two fine mesh filter bags are supported on the exterior of a rigid fine mesh stainless steel cup. This assembly is sealed within, and spaced from, the interior walls of a stainless steel canister. An air inlet communicates with the interior of the canister. A modified conventional vacuum head is physically connected to, and associated with, the interior of the mesh cup. The volume of the canister, as defined by the space between the mesh cup and the interior walls of the canister, forms a critically safe volume and geometric shape for dry radioactive particles that are gathered within the canister. A critically safe liquid volume is maintained by operation of a suction terminating float valve, and/or by operation of redundant vacuum check/liquid drain valves and placement of the air inlet. 5 figures.

  17. Critically safe volume vacuum pickup for use in wet or dry cleanup of radioactive enclosures

    DOEpatents

    Zeren, Joseph D.

    1993-12-28

    A physical compact vacuum pickup device of critically safe volume and geometric shape is provided for use in radioactive enclosures, such as a small glove box, to facilitate manual cleanup of either wet or dry radioactive material. The device is constructed and arranged so as to remain safe when filled to capacity with plutonium-239 oxide. Two fine mesh filter bags are supported on the exterior of a rigid fine mesh stainless steel cup. This assembly is sealed within, and spaced from, the interior walls of a stainless steel canister. An air inlet communicates with the interior of the canister. A modified conventional vacuum head is physically connected to, and associated with, the interior of the mesh cup. The volume of the canister, as defined by the space between the mesh cup and the interior walls of the canister, forms a critically safe volume and geometric shape for dry radioactive particles that are gathered within the canister. A critically safe liquid volume is maintained by operation of a suction terminating float valve, and/or by operation of redundant vacuum check/liquid drain valves and placement of the air inlet.

  18. Preanalytical management: serum vacuum tubes validation for routine clinical chemistry.

    PubMed

    Lima-Oliveira, Gabriel; Lippi, Giuseppe; Salvagno, Gian Luca; Montagnana, Martina; Picheth, Geraldo; Guidi, Gian Cesare

    2012-01-01

    The validation process is essential in accredited clinical laboratories. Aim of this study was to validate five kinds of serum vacuum tubes for routine clinical chemistry laboratory testing. Blood specimens from 100 volunteers in five different serum vacuum tubes (Tube I: VACUETTE, Tube II: LABOR IMPORT, Tube III: S-Monovette, Tube IV: SST and Tube V: SST II) were collected by a single, expert phlebotomist. The routine clinical chemistry tests were analyzed on cobas 6000 module. The significance of the differences between samples was assessed by paired Student's t-test after checking for normality. The level of statistical significance was set at P < 0.005. Finally, the biases from Tube I, Tube II, Tube III, Tube IV and Tube V were compared with the current desirable quality specifications for bias (B), derived from biological variation. Basically, our validation will permit the laboratory or hospital managers to select the brand's vacuum tubes validated according him/her technical or economical reasons, in order to perform the following laboratory tests: glucose, total cholesterol, high density lipoprotein-cholesterol, triglycerides, total protein, albumin, blood urea nitrogen, uric acid, alkaline phosphatise, aspartate aminotransferase, gamma-glutamyltransferase, lactate dehydrogenase, creatine kinase, total bilirubin, direct bilirubin, calcium, iron, sodium and potassium. On the contrary special attention will be required if the laboratory already performs creatinine, amylase, phosphate and magnesium determinations and the quality laboratory manager intend to change the serum tubes. We suggest that laboratory management should both standardize the procedures and frequently evaluate the quality of in vitro diagnostic devices.

  19. Radiation hard vacuum switch

    DOEpatents

    Boettcher, Gordon E.

    1990-01-01

    A vacuum switch with an isolated trigger probe which is not directly connected to the switching electrodes. The vacuum switch within the plasmatron is triggered by plasma expansion initiated by the trigger probe which travels through an opening to reach the vacuum switch elements. The plasma arc created is directed by the opening to the space between the anode and cathode of the vacuum switch to cause conduction.

  20. Radiation hard vacuum switch

    DOEpatents

    Boettcher, Gordon E.

    1990-03-06

    A vacuum switch with an isolated trigger probe which is not directly connected to the switching electrodes. The vacuum switch within the plasmatron is triggered by plasma expansion initiated by the trigger probe which travels through an opening to reach the vacuum switch elements. The plasma arc created is directed by the opening to the space between the anode and cathode of the vacuum switch to cause conduction.

  1. Large-Scale Implementation of Check-In, Check-Out: A Descriptive Study

    ERIC Educational Resources Information Center

    Hawken, Leanne S.; Bundock, Kaitlin; Barrett, Courtenay A.; Eber, Lucille; Breen, Kimberli; Phillips, Danielle

    2015-01-01

    Check-In, Check-Out (CICO) is one of the most widely implemented Tier 2 behavior interventions in a school-wide system of Positive Behavior Interventions and Supports (PBIS). Much literature has documented implementation of CICO across individual schools or districts. The Illinois PBIS Network, currently known as the Midwest PBIS Network, has…

  2. Oscillating-Linear-Drive Vacuum Compressor for CO2

    NASA Technical Reports Server (NTRS)

    Izenson, Michael G.; Shimko, Martin

    2005-01-01

    A vacuum compressor has been designed to compress CO2 from approximately equal to 1 psia (approximately equal to 6.9 kPa absolute pressure) to approximately equal to 75 psia (approximately equal to 0.52 MPa), to be insensitive to moisture, to have a long operational life, and to be lightweight, compact, and efficient. The compressor consists mainly of (1) a compression head that includes hydraulic diaphragms, a gas-compression diaphragm, and check valves; and (2) oscillating linear drive that includes a linear motor and a drive spring, through which compression force is applied to the hydraulic diaphragms. The motor is driven at the resonance vibrational frequency of the motor/spring/compression-head system, the compression head acting as a damper that takes energy out of the oscillation. The net effect of the oscillation is to cause cyclic expansion and contraction of the gas-compression diaphragm, and, hence, of the volume bounded by this diaphragm. One-way check valves admit gas into this volume from the low-pressure side during expansion and allow the gas to flow out to the high-pressure side during contraction. Fatigue data and the results of diaphragm stress calculations have been interpreted as signifying that the compressor can be expected to have an operational life of greater than 30 years with a confidence level of 99.9 percent.

  3. Vacuum fluctuations in an ancestor vacuum: A possible dark energy candidate

    NASA Astrophysics Data System (ADS)

    Aoki, Hajime; Iso, Satoshi; Lee, Da-Shin; Sekino, Yasuhiro; Yeh, Chen-Pin

    2018-02-01

    We consider an open universe created by bubble nucleation, and study possible effects of our "ancestor vacuum," a de Sitter space in which bubble nucleation occurred, on the present universe. We compute vacuum expectation values of the energy-momentum tensor for a minimally coupled scalar field, carefully taking into account the effect of the ancestor vacuum by the Euclidean prescription. We pay particular attention to the so-called supercurvature mode, a non-normalizable mode on a spatial slice of the open universe, which has been known to exist for sufficiently light fields. This mode decays in time most slowly, and may leave residual effects of the ancestor vacuum, potentially observable in the present universe. We point out that the vacuum energy of the quantum field can be regarded as dark energy if mass of the field is of order the present Hubble parameter or smaller. We obtain preliminary results for the dark energy equation of state w (z ) as a function of the redshift.

  4. What is a good health check? An interview study of health check providers' views and practices.

    PubMed

    Stol, Yrrah H; Asscher, Eva C A; Schermer, Maartje H N

    2017-10-02

    Health checks identify (risk factors for) disease in people without symptoms. They may be offered by the government through population screenings and by other providers to individual users as 'personal health checks'. Health check providers' perspective of 'good' health checks may further the debate on the ethical evaluation and possible regulation of these personal health checks. In 2015, we interviewed twenty Dutch health check providers on criteria for 'good' health checks, and the role these criteria play in their practices. Providers unanimously formulate a number of minimal criteria: Checks must focus on (risk factors for) treatable/preventable disease; Tests must be reliable and clinically valid; Participation must be informed and voluntary; Checks should provide more benefits than harms; Governmental screenings should be cost-effective. Aspirational criteria mentioned were: Follow-up care should be provided; Providers should be skilled and experienced professionals that put the benefit of (potential) users first; Providers should take time and attention. Some criteria were contested: People should be free to test on any (risk factor for) disease; Health checks should only be performed in people at high risk for disease that are likely to implement health advice; Follow up care of privately funded tests should not drain on collective resources. Providers do not always fulfil their own criteria. Their reasons reveal conflicts between criteria, conflicts between criteria and other ethical values, and point to components in the (Dutch) organisation of health care that hinder an ethical provision of health checks. Moreover, providers consider informed consent a criterion that is hard to establish in practice. According to providers, personal health checks should meet the same criteria as population screenings, with the exception of cost-effectiveness. Providers do not always fulfil their own criteria. Results indicate that in thinking about the ethics of health

  5. Simulation of the Process of Arc Energy-Effect in High Voltage Auto-Expansion SF6 Circuit Breaker

    NASA Astrophysics Data System (ADS)

    Rong, Mingzhe; Yang, Qian; Fan, Chunduo

    2005-12-01

    A new magnetic hydro-dynamics (MHD) model of arc in H.V. auto-expansion SF6 circuit breaker that takes into consideration nozzle ablation due to both radiation and thermal conduction is presented in this paper. The effect of PTFE (polytetrafluorethylene) vapor is considered in the mass, momentum and energy conservation equations of the constructed model. Then, the gas flow fields with and without conduction considered are simulated. By comparing the aforementioned two results, it is indicated that the arc's maximal temperature with conduction considered is 90 percent of that without considering conduction.

  6. Numerical study of turbulence-influence mechanism on arc characteristics in an air direct current circuit breaker

    NASA Astrophysics Data System (ADS)

    Wu, Mingliang; Yang, Fei; Rong, Mingzhe; Wu, Yi; Qi, Yang; Cui, Yufei; Liu, Zirui; Guo, Anxiang

    2016-04-01

    This paper focuses on the numerical investigation of arc characteristics in an air direct current circuit breaker (air DCCB). Using magneto-hydrodynamics (MHD) theory, 3D laminar model and turbulence model are constructed and calculated. The standard k-epsilon model is utilized to consider the turbulence effect in the arc chamber of the DCCB. Several important phenomena are found: the arc column in the turbulence-model case is more extensive, moves much more slowly than the counterpart in the laminar-model case, and shows stagnation at the entrance of the chamber, unlike in the laminar-model case. Moreover, the arc voltage in the turbulence-model case is much lower than in the laminar-model case. However, the results in the turbulence-model case show a much better agreement with the results of the breaking experiments under DC condition than in the laminar-model case, which is contradictory to the previous conclusions from the arc researches of both the low-voltage circuit breaker and the sulfur hexafluoride (SF6) nozzle. First, in the previous air-arc research of the low-voltage circuit breaker, it is assumed that the air plasma inside the chamber is in the state of laminar, and the laminar-model application gives quite satisfactory results compared with the experiments, while in this paper, the laminar-model application works badly. Second, the turbulence-model application in the arc research of the SF6-nozzle performs much better and gives higher arc voltage than the laminar-model application does, whereas in this paper, the turbulence-model application predicts lower arc voltage than the laminar-model application does. Based on the analysis of simulation results in detail, the mechanism of the above phenomena is revealed. The transport coefficients are strongly changed by turbulence, which will enhance the arc diffusion and make the arc volume much larger. Consequently, the arc appearance and the distribution of Lorentz force in the turbulence-model case

  7. 14 CFR 135.337 - Qualifications: Check airmen (aircraft) and check airmen (simulator).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... satisfactorily completed the training phases for the aircraft, including recurrent training, that are required to... under this part; (2) Has satisfactorily completed the appropriate training phases for the aircraft... ON BOARD SUCH AIRCRAFT Training § 135.337 Qualifications: Check airmen (aircraft) and check airmen...

  8. Vacuum Virtues

    ERIC Educational Resources Information Center

    Rathey, Allen

    2007-01-01

    Upright vacuums, like cars, vary in quality, features and performance. Like automobiles, some uprights are reliable, others may be problematic, and some become a problem as a result of neglect or improper use. So, how do education institutions make an informed choice and, having done so, ensure that an upright vacuum goes the distance? In this…

  9. Microfabricated triggered vacuum switch

    DOEpatents

    Roesler, Alexander W [Tijeras, NM; Schare, Joshua M [Albuquerque, NM; Bunch, Kyle [Albuquerque, NM

    2010-05-11

    A microfabricated vacuum switch is disclosed which includes a substrate upon which an anode, cathode and trigger electrode are located. A cover is sealed over the substrate under vacuum to complete the vacuum switch. In some embodiments of the present invention, a metal cover can be used in place of the trigger electrode on the substrate. Materials used for the vacuum switch are compatible with high vacuum, relatively high temperature processing. These materials include molybdenum, niobium, copper, tungsten, aluminum and alloys thereof for the anode and cathode. Carbon in the form of graphitic carbon, a diamond-like material, or carbon nanotubes can be used in the trigger electrode. Channels can be optionally formed in the substrate to mitigate against surface breakdown.

  10. 30 CFR 77.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... wires; approval by the Secretary. 77.803-2 Section 77.803-2 Mineral Resources MINE SAFETY AND HEALTH... check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires shall be approved by the Secretary only if it is determined that the system...

  11. 30 CFR 77.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... wires; approval by the Secretary. 77.803-2 Section 77.803-2 Mineral Resources MINE SAFETY AND HEALTH... check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires shall be approved by the Secretary only if it is determined that the system...

  12. 30 CFR 77.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... wires; approval by the Secretary. 77.803-2 Section 77.803-2 Mineral Resources MINE SAFETY AND HEALTH... check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires shall be approved by the Secretary only if it is determined that the system...

  13. 30 CFR 77.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... wires; approval by the Secretary. 77.803-2 Section 77.803-2 Mineral Resources MINE SAFETY AND HEALTH... check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires shall be approved by the Secretary only if it is determined that the system...

  14. 30 CFR 77.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... wires; approval by the Secretary. 77.803-2 Section 77.803-2 Mineral Resources MINE SAFETY AND HEALTH... check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires shall be approved by the Secretary only if it is determined that the system...

  15. A Systematic Review of the Empirical Support for Check-in Check-Out

    ERIC Educational Resources Information Center

    Wolfe, Katie; Pyle, Daniel; Charlton, Cade T.; Sabey, Christian V.; Lund, Emily M.; Ross, Scott W.

    2016-01-01

    Tier 2 interventions play an important role within the Positive Behavioral Interventions and Supports framework, bridging the gap between schoolwide Tier 1 interventions and individualized Tier 3 supports. Check-in Check-out (CICO) is a promising Tier 2 intervention for addressing mild problem behavior and potentially preventing the need for more…

  16. 30 CFR 75.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... wires; approval by the Secretary. 75.803-2 Section 75.803-2 Mineral Resources MINE SAFETY AND HEALTH... Underground High-Voltage Distribution § 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires will be approved only if it...

  17. 30 CFR 75.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... wires; approval by the Secretary. 75.803-2 Section 75.803-2 Mineral Resources MINE SAFETY AND HEALTH... Underground High-Voltage Distribution § 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires will be approved only if it...

  18. 30 CFR 75.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... wires; approval by the Secretary. 75.803-2 Section 75.803-2 Mineral Resources MINE SAFETY AND HEALTH... Underground High-Voltage Distribution § 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires will be approved only if it...

  19. 30 CFR 75.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... wires; approval by the Secretary. 75.803-2 Section 75.803-2 Mineral Resources MINE SAFETY AND HEALTH... Underground High-Voltage Distribution § 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires will be approved only if it...

  20. 30 CFR 75.803-2 - Ground check systems not employing pilot check wires; approval by the Secretary.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... wires; approval by the Secretary. 75.803-2 Section 75.803-2 Mineral Resources MINE SAFETY AND HEALTH... Underground High-Voltage Distribution § 75.803-2 Ground check systems not employing pilot check wires; approval by the Secretary. Ground check systems not employing pilot check wires will be approved only if it...

  1. The ice-breaker effect: singing mediates fast social bonding.

    PubMed

    Pearce, Eiluned; Launay, Jacques; Dunbar, Robin I M

    2015-10-01

    It has been proposed that singing evolved to facilitate social cohesion. However, it remains unclear whether bonding arises out of properties intrinsic to singing or whether any social engagement can have a similar effect. Furthermore, previous research has used one-off singing sessions without exploring the emergence of social bonding over time. In this semi-naturalistic study, we followed newly formed singing and non-singing (crafts or creative writing) adult education classes over seven months. Participants rated their closeness to their group and their affect, and were given a proxy measure of endorphin release, before and after their class, at three timepoints (months 1, 3 and 7). We show that although singers and non-singers felt equally connected by timepoint 3, singers experienced much faster bonding: singers demonstrated a significantly greater increase in closeness at timepoint 1, but the more gradual increase shown by non-singers caught up over time. This represents the first evidence for an 'ice-breaker effect' of singing in promoting fast cohesion between unfamiliar individuals, which bypasses the need for personal knowledge of group members gained through prolonged interaction. We argue that singing may have evolved to quickly bond large human groups of relative strangers, potentially through encouraging willingness to coordinate by enhancing positive affect.

  2. The ice-breaker effect: singing mediates fast social bonding

    PubMed Central

    Pearce, Eiluned; Launay, Jacques; Dunbar, Robin I. M.

    2015-01-01

    It has been proposed that singing evolved to facilitate social cohesion. However, it remains unclear whether bonding arises out of properties intrinsic to singing or whether any social engagement can have a similar effect. Furthermore, previous research has used one-off singing sessions without exploring the emergence of social bonding over time. In this semi-naturalistic study, we followed newly formed singing and non-singing (crafts or creative writing) adult education classes over seven months. Participants rated their closeness to their group and their affect, and were given a proxy measure of endorphin release, before and after their class, at three timepoints (months 1, 3 and 7). We show that although singers and non-singers felt equally connected by timepoint 3, singers experienced much faster bonding: singers demonstrated a significantly greater increase in closeness at timepoint 1, but the more gradual increase shown by non-singers caught up over time. This represents the first evidence for an ‘ice-breaker effect’ of singing in promoting fast cohesion between unfamiliar individuals, which bypasses the need for personal knowledge of group members gained through prolonged interaction. We argue that singing may have evolved to quickly bond large human groups of relative strangers, potentially through encouraging willingness to coordinate by enhancing positive affect. PMID:26587241

  3. Preanalytical management: serum vacuum tubes validation for routine clinical chemistry

    PubMed Central

    Lima-Oliveira, Gabriel; Lippi, Giuseppe; Salvagno, Gian Luca; Montagnana, Martina; Picheth, Geraldo; Guidi, Gian Cesare

    2012-01-01

    Introduction The validation process is essential in accredited clinical laboratories. Aim of this study was to validate five kinds of serum vacuum tubes for routine clinical chemistry laboratory testing. Materials and methods: Blood specimens from 100 volunteers in five diff erent serum vacuum tubes (Tube I: VACUETTE®, Tube II: LABOR IMPORT®, Tube III: S-Monovette®, Tube IV: SST® and Tube V: SST II®) were collected by a single, expert phlebotomist. The routine clinical chemistry tests were analyzed on cobas® 6000 module. The significance of the diff erences between samples was assessed by paired Student’s t-test after checking for normality. The level of statistical significance was set at P < 0.005. Finally, the biases from Tube I, Tube II, Tube III, Tube IV and Tube V were compared with the current desirable quality specifications for bias (B), derived from biological variation. Results and conclusions: Basically, our validation will permit the laboratory or hospital managers to select the brand’s vacuum tubes validated according him/her technical or economical reasons, in order to perform the following laboratory tests: glucose, total cholesterol, high density lipoprotein-cholesterol, triglycerides, total protein, albumin, blood urea nitrogen, uric acid, alkaline phosphatise, aspartate aminotransferase, gamma-glutamyltransferase, lactate dehydrogenase, creatine kinase, total bilirubin, direct bilirubin, calcium, iron, sodium and potassium. On the contrary special attention will be required if the laboratory already performs creatinine, amylase, phosphate and magnesium determinations and the quality laboratory manager intend to change the serum tubes. We suggest that laboratory management should both standardize the procedures and frequently evaluate the quality of in vitro diagnostic devices. PMID:22838184

  4. 14 CFR 91.1089 - Qualifications: Check pilots (aircraft) and check pilots (simulator).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... simulator, or in a flight training device for a particular type aircraft. (2) A check pilot (simulator) is a person who is qualified to conduct flight checks, but only in a flight simulator, in a flight training... (simulator) must accomplish the following— (1) Fly at least two flight segments as a required crewmember for...

  5. 14 CFR 91.1089 - Qualifications: Check pilots (aircraft) and check pilots (simulator).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... simulator, or in a flight training device for a particular type aircraft. (2) A check pilot (simulator) is a person who is qualified to conduct flight checks, but only in a flight simulator, in a flight training... (simulator) must accomplish the following— (1) Fly at least two flight segments as a required crewmember for...

  6. 14 CFR 91.1089 - Qualifications: Check pilots (aircraft) and check pilots (simulator).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... simulator, or in a flight training device for a particular type aircraft. (2) A check pilot (simulator) is a person who is qualified to conduct flight checks, but only in a flight simulator, in a flight training... (simulator) must accomplish the following— (1) Fly at least two flight segments as a required crewmember for...

  7. Vacuum probe surface sampler

    NASA Technical Reports Server (NTRS)

    Zahlava, B. A. (Inventor)

    1973-01-01

    A vacuum probe surface sampler is described for rapidly sampling relatively large surface areas which possess relatively light loading densities of micro-organism, drug particles or the like. A vacuum head with a hollow handle connected to a suitable vacuum source is frictionally attached to a cone assembly terminating in a flared tip adapted to be passed over the surface to be sampled. A fine mesh screen carried by the vacuum head provides support for a membrane filter which collects the microorganisms or other particles. The head assembly is easily removed from the cone assembly without contacting the cone assembly with human hands.

  8. Comparison of work rates, energy expenditure, and perceived exertion during a 1-h vacuuming task with a backpack vacuum cleaner and an upright vacuum cleaner.

    PubMed

    Mengelkoch, Larry J; Clark, Kirby

    2006-03-01

    The purpose of this study was to evaluate two types of industrial vacuum cleaners, in terms of cleaning rates, energy expenditure, and perceived exertion. Twelve industrial cleaners (six males and six females, age 28-39 yr) performed two 1-h vacuuming tasks with an upright vacuum cleaner (UVC) and a backpack vacuum cleaner (BPVC). Measures for oxygen uptake (VO2) and ratings of perceived exertion (RPE) were collected continuously during the 1-h vacuuming tasks. Cleaning rates for the UVC and BPVC were 7.23 and 14.98 m2min(-1), respectively. On a separate day subjects performed a maximal treadmill exercise test to determine their maximal aerobic capacity (peak VO2). Average absolute energy costs (in Metabolic equivalents), relative energy costs of the vacuum task compared to the subjects' maximal aerobic capacity (% peak VO2), and RPE responses for the 1-h vacuuming tasks were similar between vacuum cleaners, but % peak VO2 and RPE values differed between genders. These results indicate that the BPVC was more efficient than the UVC. With the BPVC, experienced workers vacuumed at a cleaning rate 2.07 times greater than the UVC and had similar levels of energy expenditure and perceived effort, compared to the slower cleaning rate with the UVC.

  9. Metal vapor arc switch electromagnetic accelerator technology

    NASA Technical Reports Server (NTRS)

    Mongeau, P. P.

    1984-01-01

    A multielectrode device housed in an insulator vacuum vessel, the metal vapor vacuum switch has high power capability and can hold off voltages up to the 100 kilovolt level. Such switches can be electronically triggered and can interrupt or commutate at a zero current crossing. The physics of arc initiation, arc conduction, and interruption are examined, including material considerations; inefficiencies; arc modes; magnetic field effects; passive and forced extinction; and voltage recovery. Heating, electrode lifetime, device configuration, and external circuit configuration are discussed. The metal vapor vacuum switch is compared with SCRs, GTOs, spark gaps, ignitrons, and mechanical breakers.

  10. Insulation co-ordination aspects for power stations with generator circuit-breakers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sanders, M.; Koeppl, G.; Kreuzer, J.

    1995-07-01

    The generator circuit-breaker (gen. c.b.) located between the generator and the step-up transformer, is now being applied world-wide. It has become a recognized electrical component of power stations which is largely due to economical advantages and increased power station availability. Technical protection considerations for power stations have always been the reason for discussion and the object of improvement. With the use of a gen. c.b., some points of view need to be considered anew. Not only the protection system in case of fault conditions will be influenced, but also the insulation co-ordination philosophy. Below the results of some calculations concerningmore » expected overvoltages are presented. These calculations are based on a transformer rated 264/15.5kV, 220 MVA. But the results are transferable to other power plants. Some measurements carried out on a transformer of the same rating complement the calculations. The findings may contribute to an improvement in insulation co-ordination and protection of the electrical system generator--step-up transformer.« less

  11. Property Differencing for Incremental Checking

    NASA Technical Reports Server (NTRS)

    Yang, Guowei; Khurshid, Sarfraz; Person, Suzette; Rungta, Neha

    2014-01-01

    This paper introduces iProperty, a novel approach that facilitates incremental checking of programs based on a property di erencing technique. Speci cally, iProperty aims to reduce the cost of checking properties as they are initially developed and as they co-evolve with the program. The key novelty of iProperty is to compute the di erences between the new and old versions of expected properties to reduce the number and size of the properties that need to be checked during the initial development of the properties. Furthermore, property di erencing is used in synergy with program behavior di erencing techniques to optimize common regression scenarios, such as detecting regression errors or checking feature additions for conformance to new expected properties. Experimental results in the context of symbolic execution of Java programs annotated with properties written as assertions show the e ectiveness of iProperty in utilizing change information to enable more ecient checking.

  12. 40 CFR 63.441 - Definitions.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... flash steam from the digester or live steam. Closed-vent system means a system that is not open to the... this subpart, including emissions from individual process vents, stacks, open pieces of process... stock chests, and their associated vacuum pumps, filtrate tanks, foam breakers or tanks, and any other...

  13. 40 CFR 63.441 - Definitions.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... flash steam from the digester or live steam. Closed-vent system means a system that is not open to the... this subpart, including emissions from individual process vents, stacks, open pieces of process... stock chests, and their associated vacuum pumps, filtrate tanks, foam breakers or tanks, and any other...

  14. 40 CFR 63.441 - Definitions.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... flash steam from the digester or live steam. Closed-vent system means a system that is not open to the... this subpart, including emissions from individual process vents, stacks, open pieces of process... stock chests, and their associated vacuum pumps, filtrate tanks, foam breakers or tanks, and any other...

  15. 40 CFR 63.441 - Definitions.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... or live steam. Closed-vent system means a system that is not open to the atmosphere and is composed... emissions from individual process vents, stacks, open pieces of process equipment, equipment leaks... stock chests, and their associated vacuum pumps, filtrate tanks, foam breakers or tanks, and any other...

  16. 40 CFR 63.441 - Definitions.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... or live steam. Closed-vent system means a system that is not open to the atmosphere and is composed... emissions from individual process vents, stacks, open pieces of process equipment, equipment leaks... stock chests, and their associated vacuum pumps, filtrate tanks, foam breakers or tanks, and any other...

  17. Dynamic process of high-current vacuum arc with consideration of magnetic field delay: numerical simulation and comparisons with the experiments

    NASA Astrophysics Data System (ADS)

    Yang, Dingge; Wang, Lijun; Jia, Shenli; Huo, Xintao; Zhang, Ling; Liu, Ke; Shi, Zongqian

    2009-03-01

    Based on a two-dimensional magnetohydrodynamic model, the dynamic process in a high-current vacuum arc (as in a high-power circuit breaker) was simulated and analysed. A half-wave of sinusoidal current was represented as a series of discrete steps, rather than as a continuous wave. The simulation was done at each step, i.e. at each of the discrete current values. In the simulation, the phase delay by which the axial magnetic field lags the current was taken into account. The curves which represent the variation of arc parameters (such as electron temperature) look sinusoidal, but the parameter values at a discrete moment in the second 1/4 cycle are smaller than those at the corresponding moment in the first 1/4 cycle (although the currents are equal at these two moments). This is perhaps mainly due to the magnetic field delay. In order to verify the correctness of the simulation, the simulation results were compared in part with the experimental results. It was seen from the experimental results that the arc column was darker but more uniform in the second 1/4 cycle than in the first 1/4 cycle, in agreement with the simulation results.

  18. Judicial Checks and Balances

    ERIC Educational Resources Information Center

    La Porta, Rafael; Lopez-de-Silanes, Florencio; Pop-Eleches, Cristian; Shleifer, Andrei

    2004-01-01

    In the Anglo-American constitutional tradition, judicial checks and balances are often seen as crucial guarantees of freedom. Hayek distinguishes two ways in which the judiciary provides such checks and balances: judicial independence and constitutional review. We create a new database of constitutional rules in 71 countries that reflect these…

  19. A radiation hard vacuum switch

    DOEpatents

    Boettcher, G.E.

    1988-07-19

    A vacuum switch with an isolated trigger probe which is not directly connected to the switching electrodes. The vacuum switch within the plasmatron is triggered by plasma expansion initiated by the trigger probe which travels through an opening to reach the vacuum switch elements. The plasma arc created is directed by the opening to the space between the anode and cathode of the vacuum switch to cause conduction. 3 figs.

  20. Comparison of vacuum rise time, vacuum limit accuracy, and occlusion break surge of 3 new phacoemulsification systems.

    PubMed

    Han, Young Keun; Miller, Kevin M

    2009-08-01

    To compare vacuum rise time, vacuum limit accuracy, and occlusion break surge of 3 new phacoemulsification machines. Jules Stein Eye Institute and Department of Ophthalmology, David Geffen School of Medicine at UCLA, Los Angeles, California, USA. The vacuum rise time under normal and enhanced aspiration modes, vacuum limit accuracy, and occlusion break surge of the Infiniti Vision System, Stellaris Vision Enhancement System, and WhiteStar Signature Phacoemulsification System were tested. Vacuum rise time and limit accuracy were measured at limit settings of 400 mm Hg and 600 mm Hg. Surge area was recorded at vacuum limit settings of 200 mm Hg, 300 mm Hg, 400 mm Hg, and 500 mm Hg. The Infiniti had the fastest vacuum rise times under normal and enhanced aspiration modes. At 4 seconds, the vacuum limit accuracy was greatest with the Infiniti at the 400 mm Hg limit and the Signature at the 600 mm Hg limit. The Stellaris did not reach either vacuum target. The Infiniti performed better than the other 2 machines during testing of occlusion break surge at all vacuum limit settings above 200 mm Hg. Under controlled laboratory test conditions, the Infiniti had the fastest vacuum rise time, greatest vacuum limit accuracy at 400 mm Hg, and least occlusion break surge. These results can be explained by the lower compliance of the Infiniti system.

  1. A rigorous approach to self-checking programming

    NASA Technical Reports Server (NTRS)

    Hua, Kien A.; Abraham, Jacob A.

    1986-01-01

    Self-checking programming is shown to be an effective concurrent error detection technique. The reliability of a self-checking program however relies on the quality of its assertion statements. A self-checking program written without formal guidelines could provide a poor coverage of the errors. A constructive technique for self-checking programming is presented. A Structured Program Design Language (SPDL) suitable for self-checking software development is defined. A set of formal rules, was also developed, that allows the transfromation of SPDL designs into self-checking designs to be done in a systematic manner.

  2. Numerical study of turbulence-influence mechanism on arc characteristics in an air direct current circuit breaker

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Wu, Mingliang; Yang, Fei, E-mail: yfei2007@mail.xjtu.edu.cn; Rong, Mingzhe

    This paper focuses on the numerical investigation of arc characteristics in an air direct current circuit breaker (air DCCB). Using magneto-hydrodynamics (MHD) theory, 3D laminar model and turbulence model are constructed and calculated. The standard k-epsilon model is utilized to consider the turbulence effect in the arc chamber of the DCCB. Several important phenomena are found: the arc column in the turbulence-model case is more extensive, moves much more slowly than the counterpart in the laminar-model case, and shows stagnation at the entrance of the chamber, unlike in the laminar-model case. Moreover, the arc voltage in the turbulence-model case ismore » much lower than in the laminar-model case. However, the results in the turbulence-model case show a much better agreement with the results of the breaking experiments under DC condition than in the laminar-model case, which is contradictory to the previous conclusions from the arc researches of both the low-voltage circuit breaker and the sulfur hexafluoride (SF6) nozzle. First, in the previous air-arc research of the low-voltage circuit breaker, it is assumed that the air plasma inside the chamber is in the state of laminar, and the laminar-model application gives quite satisfactory results compared with the experiments, while in this paper, the laminar-model application works badly. Second, the turbulence-model application in the arc research of the SF6-nozzle performs much better and gives higher arc voltage than the laminar-model application does, whereas in this paper, the turbulence-model application predicts lower arc voltage than the laminar-model application does. Based on the analysis of simulation results in detail, the mechanism of the above phenomena is revealed. The transport coefficients are strongly changed by turbulence, which will enhance the arc diffusion and make the arc volume much larger. Consequently, the arc appearance and the distribution of Lorentz force in the turbulence

  3. Air bearing vacuum seal assembly

    DOEpatents

    Booth, Rex

    1978-01-01

    An air bearing vacuum seal assembly capable of rotating at the speed of several thousand revolutions per minute using an air cushion to prevent the rotating and stationary parts from touching, and a two stage differential pumping arrangement to maintain the pressure gradient between the air cushion and the vacuum so that the leak rate into the vacuum is, for example, less than 1 .times. 10.sup.-4 Pa m.sup.3 /s. The air bearing vacuum seal has particular application for mounting rotating targets to an evacuated accelerator beam tube for bombardment of the targets with high-power charged particle beams in vacuum.

  4. Vacuum-Gauge Connection For Shipping Container

    NASA Technical Reports Server (NTRS)

    Henry, Robert H.

    1990-01-01

    External connector enables measurement of vacuum in stored part. Remote-readout connector added to shipping container and connected to thermo-couple vacuum gauge in vacuum-insulated cryogenic line packed in container. Enables monitoring of condition of vacuum without opening container.

  5. NSLS II Vacuum System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ferreira, M.; Doom, L.; Hseuh, H.

    2009-09-13

    National Synchrotron Light Source II, being constructed at Brookhaven, is a 3-GeV, 500 mA, 3rd generation synchrotron radiation facility with ultra low emittance electron beams. The storage ring vacuum system has a circumference of 792 m and consists of over 250 vacuum chambers with a simulated average operating pressure of less than 1 x 10{sup -9} mbar. A summary of the update design of the vacuum system including girder supports of the chambers, gauges, vacuum pumps, bellows, beam position monitors and simulation of the average pressure will be shown. A brief description of the techniques and procedures for cleaning andmore » mounting the chambers are given.« less

  6. Effective Porosity Measurements by Wet- and Dry-type Vacuum Saturations using Process-Programmable Vacuum Saturation System

    NASA Astrophysics Data System (ADS)

    Lee, T. J.; Lee, K. S., , Dr; Lee, S. K.

    2017-12-01

    One of the most important factors in measuring effective porosity by vacuum saturation method is that the air in the pore space can be fully substituted by water during the vacuum saturation process. International Society of Rock Mechanics (ISRM) suggests vacuuming a rock sample submerged in the water, while American Society of Test and Materials (ASTM) vacuuming the sample and water separately and then pour the water to the sample. In this study, we call the former wet-type vacuum saturation (WVS) method and the latter dry-type vacuum saturation (DVS) method, and compare the effective porosity measured by the two different vacuum saturation processes. For that purpose, a vacuum saturation system has been developed, which can support both WVS and DVS by only changing the process by programming. Comparison of effective porosity has been made for a cement mortar and rock samples. As a result, DVS can substitute more void volume to water than WVS, which in turn insists that DVS can provide more exact value of effective porosity than WVS.

  7. Function-Based Modification of Check-In/Check-Out to Influence Escape-Maintained Behavior

    ERIC Educational Resources Information Center

    Kilgus, Stephen P.; Fallon, Lindsay M.; Feinberg, Adam B.

    2016-01-01

    Prior research has suggested Check-In/Check-Out (CICO) effectiveness is linked to the function of problem behavior. Though effective for students whose misbehavior occurs to gain attention, findings are equivocal for behavior that occurs to escape academic tasks. The purpose of this study was to therefore evaluate a modification to CICO, wherein…

  8. Smooth criminal: convicted rule-breakers show reduced cognitive conflict during deliberate rule violations.

    PubMed

    Jusyte, Aiste; Pfister, Roland; Mayer, Sarah V; Schwarz, Katharina A; Wirth, Robert; Kunde, Wilfried; Schönenberg, Michael

    2017-09-01

    Classic findings on conformity and obedience document a strong and automatic drive of human agents to follow any type of rule or social norm. At the same time, most individuals tend to violate rules on occasion, and such deliberate rule violations have recently been shown to yield cognitive conflict for the rule-breaker. These findings indicate persistent difficulty to suppress the rule representation, even though rule violations were studied in a controlled experimental setting with neither gains nor possible sanctions for violators. In the current study, we validate these findings by showing that convicted criminals, i.e., individuals with a history of habitual and severe forms of rule violations, can free themselves from such cognitive conflict in a similarly controlled laboratory task. These findings support an emerging view that aims at understanding rule violations from the perspective of the violating agent rather than from the perspective of outside observer.

  9. Analytical Analysis and Case Study of Transient Behavior of Inrush Current in Power Transformer for Designing of Efficient Circuit Breakers

    NASA Astrophysics Data System (ADS)

    Harmanpreet, Singh, Sukhwinder; Kumar, Ashok; Kaur, Parneet

    2010-11-01

    Stability & security are main aspects in electrical power systems. Transformer protection is major issue of concern to system operation. There are many mall-trip cases of transformer protection are caused by inrush current problems. The phenomenon of transformer inrush current has been discussed in many papers since 1958. In this paper analytical analysis of inrush current in a transformer switched on dc and ac supply has been done. This analysis will help in design aspects of circuit breakers for better performance.

  10. Child Care: State Requirements for Background Checks.

    ERIC Educational Resources Information Center

    Fagnoni, Cynthia

    Background checks involve gathering information from state and federal databases to determine if child care providers have a history of child abuse or other criminal convictions that would make them unacceptable for working with children. Background checks include state criminal history checks, state child abuse registry checks, and Federal Bureau…

  11. Software tool for physics chart checks.

    PubMed

    Li, H Harold; Wu, Yu; Yang, Deshan; Mutic, Sasa

    2014-01-01

    Physics chart check has long been a central quality assurance (QC) measure in radiation oncology. The purpose of this work is to describe a software tool that aims to accomplish simplification, standardization, automation, and forced functions in the process. Nationally recognized guidelines, including American College of Radiology and American Society for Radiation Oncology guidelines and technical standards, and the American Association of Physicists in Medicine Task Group reports were identified, studied, and summarized. Meanwhile, the reported events related to physics chart check service were analyzed using an event reporting and learning system. A number of shortfalls in the chart check process were identified. To address these problems, a software tool was designed and developed under Microsoft. Net in C# to hardwire as many components as possible at each stage of the process. The software consists of the following 4 independent modules: (1) chart check management; (2) pretreatment and during treatment chart check assistant; (3) posttreatment chart check assistant; and (4) quarterly peer-review management. The users were a large group of physicists in the author's radiation oncology clinic. During over 1 year of use the tool has proven very helpful in chart checking management, communication, documentation, and maintaining consistency. The software tool presented in this work aims to assist physicists at each stage of the physics chart check process. The software tool is potentially useful for any radiation oncology clinics that are either in the process of pursuing or maintaining the American College of Radiology accreditation.

  12. Influence of deep cryogenic treatment on structure and wear resistance of materials of hydraulic breaker chisels

    NASA Astrophysics Data System (ADS)

    Bolobov, V. I.; BinhLe, Thanh

    2018-03-01

    It is shown that shallow cryogenic treatment at -75°C (SCT) of the materials of hydraulic breaker chisels - P20, 1080 and D2 steels leads to a decrease (44 ÷ 82%) in the amount of retained austenite and an increase (26 ÷ 99%) in the amount of carbides in the structure of hardened steel, which is accompanied by an increase in its hardness (1.4 ÷ 2.1%) and abrasive wear resistance (10 ÷ 31%) with a simultaneous decrease in impact toughness (19 ÷ 24%). Deep cryogenic treatment at -196°C (DCT) and subsequent low-temperature tempering of D2 steel leads to a significant increase in its wear resistance (98%) and impact toughness (32%).

  13. [Pre-verbality in focusing and the need for self check. An attempt at "focusing check"].

    PubMed

    Masui, T; Ikemi, A; Murayama, S

    1983-06-01

    Though the Focusing process is not entirely non-verbal, in Focusing, careful attention is paid by the Focuser and the Listener to the pre-verbal experiential process. In other words, Focusing involves attending to the felt sense that is not easily expressed in words immediately. Hence, during the process of learning to Focus, the Focusing teacher attempts to communicate the experiences of Focusing to the student which are not easily done by words. Due to such difficulties, the Focusing student may (and quite frequently does) mistake the experiential process in Focusing with other processes. Often, the felt sense can be confused with other phenomena such as "autogenic discharge". Also the Focuser may not stay with the felt sense and drift into "free association" or frequently, certain processes in "meditation" can be confused with Focusing. Therefore, there is a need for a "check" by which the Focusing student can confirm the Focusing experience for himself. For the Focusing student, such a "check" serves not only to confirm the Focusing process, but also an aid to learning Focusing. We will report here a "Focusing Check" which we developed by translating Eugene Gendlin's "Focusing Check" and making several modifications in it so that it will be more understandable to the Japanese. Along with the "Focusing Check" we developed, the authors discuss the need for such a check.

  14. Program Model Checking: A Practitioner's Guide

    NASA Technical Reports Server (NTRS)

    Pressburger, Thomas T.; Mansouri-Samani, Masoud; Mehlitz, Peter C.; Pasareanu, Corina S.; Markosian, Lawrence Z.; Penix, John J.; Brat, Guillaume P.; Visser, Willem C.

    2008-01-01

    Program model checking is a verification technology that uses state-space exploration to evaluate large numbers of potential program executions. Program model checking provides improved coverage over testing by systematically evaluating all possible test inputs and all possible interleavings of threads in a multithreaded system. Model-checking algorithms use several classes of optimizations to reduce the time and memory requirements for analysis, as well as heuristics for meaningful analysis of partial areas of the state space Our goal in this guidebook is to assemble, distill, and demonstrate emerging best practices for applying program model checking. We offer it as a starting point and introduction for those who want to apply model checking to software verification and validation. The guidebook will not discuss any specific tool in great detail, but we provide references for specific tools.

  15. Simple Check Valves for Microfluidic Devices

    NASA Technical Reports Server (NTRS)

    Willis, Peter A.; Greer, Harold F.; Smith, J. Anthony

    2010-01-01

    A simple design concept for check valves has been adopted for microfluidic devices that consist mostly of (1) deformable fluorocarbon polymer membranes sandwiched between (2) borosilicate float glass wafers into which channels, valve seats, and holes have been etched. The first microfluidic devices in which these check valves are intended to be used are micro-capillary electrophoresis (microCE) devices undergoing development for use on Mars in detecting compounds indicative of life. In this application, it will be necessary to store some liquid samples in reservoirs in the devices for subsequent laboratory analysis, and check valves are needed to prevent cross-contamination of the samples. The simple check-valve design concept is also applicable to other microfluidic devices and to fluidic devices in general. These check valves are simplified microscopic versions of conventional rubber- flap check valves that are parts of numerous industrial and consumer products. These check valves are fabricated, not as separate components, but as integral parts of microfluidic devices. A check valve according to this concept consists of suitably shaped portions of a deformable membrane and the two glass wafers between which the membrane is sandwiched (see figure). The valve flap is formed by making an approximately semicircular cut in the membrane. The flap is centered over a hole in the lower glass wafer, through which hole the liquid in question is intended to flow upward into a wider hole, channel, or reservoir in the upper glass wafer. The radius of the cut exceeds the radius of the hole by an amount large enough to prevent settling of the flap into the hole. As in a conventional rubber-flap check valve, back pressure in the liquid pushes the flap against the valve seat (in this case, the valve seat is the adjacent surface of the lower glass wafer), thereby forming a seal that prevents backflow.

  16. Multipurpose Vacuum Induction Processing System

    NASA Astrophysics Data System (ADS)

    Govindaraju, M.; Kulkarni, Deepak; Balasubramanian, K.

    2012-11-01

    Multipurpose vacuum processing systems are cost effective; occupy less space, multiple functional under one roof and user friendly. A multipurpose vacuum induction system was designed, fabricated and installed in a record time of 6 months time at NFTDC Hyderabad. It was designed to function as a) vacuum induction melting/refining of oxygen free electronic copper/pure metals, b) vacuum induction melting furnace for ferrous materials c) vacuum induction melting for non ferrous materials d) large vacuum heat treatment chamber by resistance heating (by detachable coil and hot zone) e) bottom discharge vacuum induction melting system for non ferrous materials f) Induction heat treatment system and g) directional solidification /investment casting. It contains provision for future capacity addition. The attachments require to manufacture multiple shaped castings and continuous rod casting can be added whenever need arises. Present capacity is decided on the requirement for 10years of development path; presently it has 1.2 ton liquid copper handling capacity. It is equipped with provision for capacity addition up to 2 ton liquid copper handling capacity in future. Provision is made to carry out the capacity addition in easy steps quickly. For easy operational maintenance and troubleshooting, design was made in easily detachable sections. High vacuum system is also is detachable, independent and easily movable which is first of its kind in the country. Detailed design parameters, advantages and development history are presented in this paper.

  17. MPST Software: grl_pef_check

    NASA Technical Reports Server (NTRS)

    Call, Jared A.; Kwok, John H.; Fisher, Forest W.

    2013-01-01

    This innovation is a tool used to verify and validate spacecraft sequences at the predicted events file (PEF) level for the GRAIL (Gravity Recovery and Interior Laboratory, see http://www.nasa. gov/mission_pages/grail/main/index. html) mission as part of the Multi-Mission Planning and Sequencing Team (MPST) operations process to reduce the possibility for errors. This tool is used to catch any sequence related errors or issues immediately after the seqgen modeling to streamline downstream processes. This script verifies and validates the seqgen modeling for the GRAIL MPST process. A PEF is provided as input, and dozens of checks are performed on it to verify and validate the command products including command content, command ordering, flight-rule violations, modeling boundary consistency, resource limits, and ground commanding consistency. By performing as many checks as early in the process as possible, grl_pef_check streamlines the MPST task of generating GRAIL command and modeled products on an aggressive schedule. By enumerating each check being performed, and clearly stating the criteria and assumptions made at each step, grl_pef_check can be used as a manual checklist as well as an automated tool. This helper script was written with a focus on enabling the user with the information they need in order to evaluate a sequence quickly and efficiently, while still keeping them informed and active in the overall sequencing process. grl_pef_check verifies and validates the modeling and sequence content prior to investing any more effort into the build. There are dozens of various items in the modeling run that need to be checked, which is a time-consuming and errorprone task. Currently, no software exists that provides this functionality. Compared to a manual process, this script reduces human error and saves considerable man-hours by automating and streamlining the mission planning and sequencing task for the GRAIL mission.

  18. Regular Check-Ups Are Important

    MedlinePlus

    ... Halloween Prom Tips Spring Break Valentine Tips Winter Holiday Tips 12 Ways Holiday Song Healthy Living Check-Ups are Important Check- ... Test Wash Hands Stay Warm Have a Healthy Holiday Don’t Drink and Drive Widgets Healthy People ...

  19. Vacuum leak detector and method

    DOEpatents

    Edwards, Jr., David

    1983-01-01

    Apparatus and method for detecting leakage in a vacuum system involves a moisture trap chamber connected to the vacuum system and to a pressure gauge. Moisture in the trap chamber is captured by freezing or by a moisture adsorbent to reduce the residual water vapor pressure therein to a negligible amount. The pressure gauge is then read to determine whether the vacuum system is leaky. By directing a stream of carbon dioxide or helium at potentially leaky parts of the vacuum system, the apparatus can be used with supplemental means to locate leaks.

  20. Body checking behaviors in men.

    PubMed

    Walker, D Catherine; Anderson, Drew A; Hildebrandt, Thomas

    2009-06-01

    Males have been facing increasing pressure from the media to attain a lean, muscular physique, and are at risk for body dissatisfaction, disturbed eating and exercise behaviors, and abuse of appearance- and performance-enhancing drugs (APEDs). The aim of the current study was to examine the relationship between body checking and mood, symptoms of muscle dysmorphia, importance of shape and weight, and APED use in undergraduate males. Body checking in males was correlated with weight and shape concern, symptoms of muscle dysmorphia, depression, negative affect, and APED use. Body checking predicted APED use and uniquely accounted for the largest amount of variance in Muscle Dysmorphic Disorder Inventory (MDDI) scores (16%). Findings support the view that body checking is an important construct in male body image, muscle dysmorphia, and body change strategies and suggest a need for further research.

  1. Robot design for a vacuum environment

    NASA Technical Reports Server (NTRS)

    Belinski, S.; Trento, W.; Imani-Shikhabadi, R.; Hackwood, S.

    1987-01-01

    The cleanliness requirements for many processing and manufacturing tasks are becoming ever stricter, resulting in a greater interest in the vacuum environment. Researchers discuss the importance of this special environment, and the development of robots which are physically and functionally suited to vacuum processing tasks. Work is in progress at the Center for robotic Systems in Microelectronics (CRSM) to provide a robot for the manufacture of a revolutionary new gyroscope in high vacuum. The need for vacuum in this and other processes is discussed as well as the requirements for a vacuum-compatible robot. Finally, researchers present details on work done at the CRSM to modify an existing clean-room compatible robot for use at high vacuum.

  2. An Experimental Study of Droplets Produced by a Plunging Breakers

    NASA Astrophysics Data System (ADS)

    Erinin, Martin; Wang, Dan; Towle, David; Liu, Xinan; Duncan, James

    2016-11-01

    In this study, the production of droplets by a mechanically generated plunging breaking water wave is investigated in a wave tank. The breaker, with an amplitude of 0.070 m, is generated repeatedly with a programmable wave maker by using a dispersively focused wave packet (average frequency 1.15 Hz). The profile histories of the breaking wave crests along the center plane of the tank are measured using cinematic laser-induced fluorescence. The droplets are measured using a cinematic digital in-line holographic system positioned at 30 locations along a horizontal plane that is 1 cm above the maximum wave crest height. This measurement plane covers the entire region in the tank where the wave breaks. The holographic system is used to obtain the droplet diameters (d, for d >100 microns) and the three components of the droplet velocities. From these measurements and counting only the droplets that are moving up, the spatio-temporal distribution of droplet generation by the breaking wave is obtained. The main features of the droplet generation are correlated with the features and phases of the breaking process. The support of the National Science Foundation under Grant OCE0751853 from the Division of Ocean Sciences is gratefully acknowledged.

  3. 25 CFR 11.421 - Bad checks.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 25 Indians 1 2010-04-01 2010-04-01 false Bad checks. 11.421 Section 11.421 Indians BUREAU OF... Criminal Offenses § 11.421 Bad checks. (a) A person who issues or passes a check or similar sight order for..., and the issuer failed to make good within 10 days after receiving notice of that refusal. ...

  4. 40 CFR 63.685 - Standards: Tanks.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... organic-contaminated debris is dumped from roll-off boxes or dump trucks, and then this debris is promptly... roof except for automatic bleeder vents (vacuum breaker vents) and the rim space vents is to provide a... gasketed cover or a gasketed lid except for leg sleeves, automatic bleeder vents, rim space vents, column...

  5. 40 CFR 63.685 - Standards: Tanks.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... organic-contaminated debris is dumped from roll-off boxes or dump trucks, and then this debris is promptly... roof except for automatic bleeder vents (vacuum breaker vents) and the rim space vents is to provide a... gasketed cover or a gasketed lid except for leg sleeves, automatic bleeder vents, rim space vents, column...

  6. 40 CFR 63.685 - Standards: Tanks.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... organic-contaminated debris is dumped from roll-off boxes or dump trucks, and then this debris is promptly... roof except for automatic bleeder vents (vacuum breaker vents) and the rim space vents is to provide a... gasketed cover or a gasketed lid except for leg sleeves, automatic bleeder vents, rim space vents, column...

  7. 40 CFR 63.685 - Standards: Tanks.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... organic-contaminated debris is dumped from roll-off boxes or dump trucks, and then this debris is promptly... roof except for automatic bleeder vents (vacuum breaker vents) and the rim space vents is to provide a... gasketed cover or a gasketed lid except for leg sleeves, automatic bleeder vents, rim space vents, column...

  8. 38 CFR 3.1003 - Returned and canceled checks.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 38 Pensions, Bonuses, and Veterans' Relief 1 2010-07-01 2010-07-01 false Returned and canceled... canceled checks. Where the payee of a check for benefits has died prior to negotiating the check, the check shall be returned to the issuing office and canceled. (a) The amount represented by the returned check...

  9. Technical specification for vacuum systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Khaw, J.

    The vacuum systems at the Stanford Linear Accelerator Center (SLAC) are primarily of all-metal construction and operate at pressures from 10/sup -5/ to 10/sup -11/ Torr. The primary gas loads during operation result from thermal desorption and beam-induced desorption from the vacuum chamber walls. These desorption rates can be extremely high in the case of hydrocarbons and other contaminants. These specifications place a major emphasis on eliminating contamination sources. The specifications and procedures have been written to insure the cleanliness and vacuum integrity of all SLAC vacuum systems, and to assist personnel involved with SLAC vacuum systems in choosing andmore » designing components that are compatible with existing systems and meet the quality and reliability of SLAC vacuum standards. The specification includes requirements on design, procurement, fabrication, chemical cleaning, clean room practices, welding and brazing, helium leak testing, residual gas analyzer testing, bakeout, venting, and pumpdown. Also appended are specifications regarding acceptable vendors, isopropyl alcohol, bakeable valve cleaning procedure, mechanical engineering safety inspection, notes on synchrotron radiation, and specifications of numerous individual components. (LEW)« less

  10. Implementing Check in/Check out for Students with Intellectual Disability in Self-Contained Classrooms

    ERIC Educational Resources Information Center

    Boden, Lauren J.; Ennis, Robin P.; Jolivette, Kristine

    2012-01-01

    Check in/check out (CICO) is a secondary-tier intervention implemented within the framework of schoolwide positive behavior interventions and supports (SWPBIS) that uses school-based contingencies to encourage positive behavior. CICO is a five-step cycle which uses daily progress report cards (DPR) to monitor progress toward schoolwide or…

  11. The U.S. Lab is placed in vacuum chamber for leak test

    NASA Technical Reports Server (NTRS)

    2000-01-01

    With the lid of the three-story vacuum chamber in place, a worker on top checks release of the cables. Inside the chamber is the U.S. Lab, a component of the International Space Station. The 32,000-pound scientific research lab, named Destiny, is the first Space Station element to spend seven days in the renovated vacuum chamber for a leak test. Destiny is scheduled to be launched on Shuttle mission STS-98, the 5A assembly mission, targeted for Jan. 18, 2001. During the mission, the crew will install the Lab in the Space Station during a series of three space walks. The STS-98 mission will provide the Station with science research facilities and expand its power, life support and control capabilities. The U.S. Lab module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research.

  12. The U.S. Lab is placed in vacuum chamber for leak test

    NASA Technical Reports Server (NTRS)

    2000-01-01

    A worker in the Operations and Checkout Building checks the placement of the lid on the vacuum chamber containing the U.S. Lab, a component of the International Space Station. The 32,000-pound scientific research lab, named Destiny, is the first Space Station element to spend seven days in the renovated vacuum chamber for a leak test. Destiny is scheduled to be launched on Shuttle mission STS-98, the 5A assembly mission, targeted for Jan. 18, 2001. During the mission, the crew will install the Lab in the Space Station during a series of three space walks. The STS-98 mission will provide the Station with science research facilities and expand its power, life support and control capabilities. The U.S. Lab module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research.

  13. The U.S. Lab is placed in vacuum chamber for leak test

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Workers in the Operations and Checkout Building check the placement of the lid on the vacuum chamber containing the U.S. Lab, a component of the International Space Station. The 32,000-pound scientific research lab, named Destiny, is the first Space Station element to spend seven days in the renovated vacuum chamber for a leak test. Destiny is scheduled to be launched on Shuttle mission STS-98, the 5A assembly mission, targeted for Jan. 18, 2001. During the mission, the crew will install the Lab in the Space Station during a series of three space walks. The STS-98 mission will provide the Station with science research facilities and expand its power, life support and control capabilities. The U.S. Lab module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research.

  14. Bakeout Chamber Within Vacuum Chamber

    NASA Technical Reports Server (NTRS)

    Taylor, Daniel M.; Soules, David M.; Barengoltz, Jack B.

    1995-01-01

    Vacuum-bakeout apparatus for decontaminating and measuring outgassing from pieces of equipment constructed by mounting bakeout chamber within conventional vacuum chamber. Upgrade cost effective: fabrication and installation of bakeout chamber simple, installation performed quickly and without major changes in older vacuum chamber, and provides quantitative data on outgassing from pieces of equipment placed in bakeout chamber.

  15. Spherically symmetric vacuum in covariant F (T )=T +α/2 T2+O (Tγ) gravity theory

    NASA Astrophysics Data System (ADS)

    DeBenedictis, Andrew; Ilijić, Saša

    2016-12-01

    Recently, a fully covariant version of the theory of F (T ) torsion gravity has been introduced by M. Kršśák and E. Saridakis [Classical Quantum Gravity 33, 115009 (2016)]. In covariant F (T ) gravity, the Schwarzschild solution is not a vacuum solution for F (T )≠T , and therefore determining the spherically symmetric vacuum is an important open problem. Within the covariant framework, we perturbatively solve the spherically symmetric vacuum gravitational equations around the Schwarzschild solution for the scenario with F (T )=T +(α /2 )T2 , representing the dominant terms in theories governed by Lagrangians analytic in the torsion scalar. From this, we compute the perihelion shift correction to solar system planetary orbits as well as perturbative gravitational effects near neutron stars. This allows us to set an upper bound on the magnitude of the coupling constant, α , which governs deviations from general relativity. We find the bound on this nonlinear torsion coupling constant by specifically considering the uncertainty in the perihelion shift of Mercury. We also analyze a bound from a similar comparison with the periastron orbit of the binary pulsar PSR J0045-7319 as an independent check for consistency. Setting bounds on the dominant nonlinear coupling is important in determining if other effects in the Solar System or greater universe could be attributable to nonlinear torsion.

  16. The biometric imaginary: (Dis)trust in a policy vacuum.

    PubMed

    Gunnarsdóttir, Kristrún; Rommetveit, Kjetil

    2017-02-01

    The decision in Europe to implement biometric passports, visas and residence permits was made at the highest levels without much consultation, checks and balances. Council regulation came into force relatively unnoticed in January 2005, as part of wider securitization policies urging systems interoperability and data sharing across borders. This article examines the biometric imaginary that characterizes this European Union decision, dictated by executive powers in the policy vacuum after 9/11 - a depiction of mobility governance, technological necessity and whom/what to trust or distrust, calling upon phantom publics to justify decisions rather than test their grounding. We consult an online blog we operated in 2010 to unravel this imaginary years on. Drawing on Dewey's problem of the public, we discuss this temporary opening of a public space in which the imaginary could be reframed and contested, and how such activities may shape, if at all, relations between politics, publics, policy intervention and societal development.

  17. Improving Vacuum Cleaners

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Under a Space Act Agreement between the Kirby company and Lewis Research Center, NASA technology was applied to a commercial vacuum cleaner product line. Kirby engineers were interested in advanced operational concepts, such as particle flow behavior and vibration, critical factors to improve vacuum cleaner performance. An evaluation of the company 1994 home care system, the Kirby G4, led to the refinement of the new G5 and future models. Under the cooperative agreement, Kirby had access to Lewis' holography equipment, which added insight into how long a vacuum cleaner fan would perform, as well as advanced computer software that can simulate the flow of air through fans. The collaboration resulted in several successes including fan blade redesign and continuing dialogue on how to improve air-flow traits in various nozzle designs.

  18. 12 CFR Appendix A to Part 229 - Routing Number Guide to Next-Day Availability Checks and Local Checks

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Routing Number Guide to Next-Day Availability Checks and Local Checks A Appendix A to Part 229 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE SYSTEM AVAILABILITY OF FUNDS AND COLLECTION OF CHECKS...

  19. Switching Circuit for Shop Vacuum System

    NASA Technical Reports Server (NTRS)

    Burley, R. K.

    1987-01-01

    No internal connections to machine tools required. Switching circuit controls vacuum system draws debris from grinders and sanders in machine shop. Circuit automatically turns on vacuum system whenever at least one sander or grinder operating. Debris safely removed, even when operator neglects to turn on vacuum system manually. Pickup coils sense alternating magnetic fields just outside operating machines. Signal from any coil or combination of coils causes vacuum system to be turned on.

  20. Vacuum Brazing of Accelerator Components

    NASA Astrophysics Data System (ADS)

    Singh, Rajvir; Pant, K. K.; Lal, Shankar; Yadav, D. P.; Garg, S. R.; Raghuvanshi, V. K.; Mundra, G.

    2012-11-01

    Commonly used materials for accelerator components are those which are vacuum compatible and thermally conductive. Stainless steel, aluminum and copper are common among them. Stainless steel is a poor heat conductor and not very common in use where good thermal conductivity is required. Aluminum and copper and their alloys meet the above requirements and are frequently used for the above purpose. The accelerator components made of aluminum and its alloys using welding process have become a common practice now a days. It is mandatory to use copper and its other grades in RF devices required for accelerators. Beam line and Front End components of the accelerators are fabricated from stainless steel and OFHC copper. Fabrication of components made of copper using welding process is very difficult and in most of the cases it is impossible. Fabrication and joining in such cases is possible using brazing process especially under vacuum and inert gas atmosphere. Several accelerator components have been vacuum brazed for Indus projects at Raja Ramanna Centre for Advanced Technology (RRCAT), Indore using vacuum brazing facility available at RRCAT, Indore. This paper presents details regarding development of the above mentioned high value and strategic components/assemblies. It will include basics required for vacuum brazing, details of vacuum brazing facility, joint design, fixturing of the jobs, selection of filler alloys, optimization of brazing parameters so as to obtain high quality brazed joints, brief description of vacuum brazed accelerator components etc.

  1. The physical and physiological effects of vacuum massage on the different skin layers: a current status of the literature.

    PubMed

    Moortgat, Peter; Anthonissen, Mieke; Meirte, Jill; Van Daele, Ulrike; Maertens, Koen

    2016-01-01

    Vacuum massage is a non-invasive mechanical massage technique performed with a mechanical device that lifts the skin by means of suction, creates a skin fold and mobilises that skin fold. In the late 1970s, this therapy was introduced to treat traumatic or burn scars. Although vacuum massage was invented to treat burns and scars, one can find very little literature on the effects of this intervention. Therefore, the aim of this review is to present an overview of the available literature on the physical and physiological effects of vacuum massage on epidermal and dermal skin structures in order to find the underlying working mechanisms that could benefit the healing of burns and scars. The discussion contains translational analysis of the results and provides recommendations for future research on the topic. An extended search for publications was performed using PubMed, Web of Science and Google Scholar. Two authors independently identified and checked each study against the inclusion criteria. Nineteen articles were included in the qualitative synthesis. The two most reported physical effects of vacuum massage were improvement of the tissue hardness and the elasticity of the skin. Besides physical effects, a variety of physiological effects are reported in literature, for example, an increased number of fibroblasts and collagen fibres accompanied by an alteration of fibroblast phenotype and collagen orientation. Little information was found on the decrease of pain and itch due to vacuum massage. Although vacuum massage initially had been developed for the treatment of burn scars, this literature review found little evidence for the efficacy of this treatment. Variations in duration, amplitude or frequency of the treatment have a substantial influence on collagen restructuring and reorientation, thus implying possible beneficial influences on the healing potential by mechanotransduction pathways. Vacuum massage may release the mechanical tension associated with

  2. Vacuum-insulated catalytic converter

    DOEpatents

    Benson, David K.

    2001-01-01

    A catalytic converter has an inner canister that contains catalyst-coated substrates and an outer canister that encloses an annular, variable vacuum insulation chamber surrounding the inner canister. An annular tank containing phase-change material for heat storage and release is positioned in the variable vacuum insulation chamber a distance spaced part from the inner canister. A reversible hydrogen getter in the variable vacuum insulation chamber, preferably on a surface of the heat storage tank, releases hydrogen into the variable vacuum insulation chamber to conduct heat when the phase-change material is hot and absorbs the hydrogen to limit heat transfer to radiation when the phase-change material is cool. A porous zeolite trap in the inner canister absorbs and retains hydrocarbons from the exhaust gases when the catalyst-coated substrates and zeolite trap are cold and releases the hydrocarbons for reaction on the catalyst-coated substrate when the zeolite trap and catalyst-coated substrate get hot.

  3. Vacuum-Induction, Vacuum-Arc, and Air-Induction Melting of a Complex Heat-Resistant Alloy

    NASA Technical Reports Server (NTRS)

    Decker, R. F.; Rowe, John P.; Freeman, J. W.

    1959-01-01

    The relative hot-workability and creep-rupture properties at 1600 F of a complex 55Ni-20Cr-15Co-4Mo-3Ti-3Al alloy were evaluated for vacuum-induction, vacuum-arc, and air-induction melting. A limited study of the role of oxygen and nitrogen and the structural effects in the alloy associated with the melting process was carried out. The results showed that the level of boron and/or zirconium was far more influential on properties than the melting method. Vacuum melting did reduce corner cracking and improve surface during hot-rolling. It also resulted in more uniform properties within heats. The creep-rupture properties were slightly superior in vacuum heats at low boron plus zirconium or in heats with zirconium. There was little advantage at high boron levels and air heats were superior at high levels of boron plus zirconium. Vacuum heats also had fewer oxide and carbonitride inclusions although this was a function of the opportunity for separation of the inclusions from high oxygen plus nitrogen heats. The removal of phosphorous by vacuum melting was not found to be related to properties. Oxygen plus nitrogen appeared to increase ductility in creep-rupture tests suggesting that vacuum melting removes unidentified elements detrimental to ductility. Oxides and carbonitrides in themselves did not initiate microcracks. Carbonitrides in the grain boundaries of air heats did initiate microcracks. The role of microcracking from this source and as a function of oxygen and nitrogen content was not clear. Oxygen and nitrogen did intensify corner cracking during hot-rolling but were not responsible for poor surface which resulted from rolling heats melted in air.

  4. 48 CFR 22.406-7 - Compliance checking.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 48 Federal Acquisition Regulations System 1 2010-10-01 2010-10-01 false Compliance checking. 22... Involving Construction 22.406-7 Compliance checking. (a) General. The contracting officer shall make checks and investigations on all contracts covered by this subpart as may be necessary to ensure compliance...

  5. 30 CFR 75.1715 - Identification check system.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... system. [Statutory Provisions] Each operator of a coal mine shall establish a check-in and check-out system which will provide positive identification of every person underground, and will provide an... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Identification check system. 75.1715 Section 75...

  6. 30 CFR 75.1715 - Identification check system.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... system. [Statutory Provisions] Each operator of a coal mine shall establish a check-in and check-out system which will provide positive identification of every person underground, and will provide an... 30 Mineral Resources 1 2012-07-01 2012-07-01 false Identification check system. 75.1715 Section 75...

  7. 30 CFR 75.1715 - Identification check system.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... system. [Statutory Provisions] Each operator of a coal mine shall establish a check-in and check-out system which will provide positive identification of every person underground, and will provide an... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Identification check system. 75.1715 Section 75...

  8. 30 CFR 75.1715 - Identification check system.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... system. [Statutory Provisions] Each operator of a coal mine shall establish a check-in and check-out system which will provide positive identification of every person underground, and will provide an... 30 Mineral Resources 1 2013-07-01 2013-07-01 false Identification check system. 75.1715 Section 75...

  9. 30 CFR 75.1715 - Identification check system.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... system. [Statutory Provisions] Each operator of a coal mine shall establish a check-in and check-out system which will provide positive identification of every person underground, and will provide an... 30 Mineral Resources 1 2014-07-01 2014-07-01 false Identification check system. 75.1715 Section 75...

  10. Aerospell Supplemental Spell Check File

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Aerospell is a supplemental spell check file that can be used as a resource for researchers, writers, editors, students, and others who compose scientific and technical texts. The file extends the general spell check dictionaries of word processors by adding more than 13,000 words used in a broad range of aerospace and related disciplines.

  11. Wireless Integrated Microelectronic Vacuum Sensor System

    NASA Technical Reports Server (NTRS)

    Krug, Eric; Philpot, Brian; Trott, Aaron; Lawrence, Shaun

    2013-01-01

    NASA Stennis Space Center's (SSC's) large rocket engine test facility requires the use of liquid propellants, including the use of cryogenic fluids like liquid hydrogen as fuel, and liquid oxygen as an oxidizer (gases which have been liquefied at very low temperatures). These fluids require special handling, storage, and transfer technology. The biggest problem associated with transferring cryogenic liquids is product loss due to heat transfer. Vacuum jacketed piping is specifically designed to maintain high thermal efficiency so that cryogenic liquids can be transferred with minimal heat transfer. A vacuum jacketed pipe is essentially two pipes in one. There is an inner carrier pipe, in which the cryogenic liquid is actually transferred, and an outer jacket pipe that supports and seals the vacuum insulation, forming the "vacuum jacket." The integrity of the vacuum jacketed transmission lines that transfer the cryogenic fluid from delivery barges to the test stand must be maintained prior to and during engine testing. To monitor the vacuum in these vacuum jacketed transmission lines, vacuum gauge readings are used. At SSC, vacuum gauge measurements are done on a manual rotation basis with two technicians, each using a handheld instrument. Manual collection of vacuum data is labor intensive and uses valuable personnel time. Additionally, there are times when personnel cannot collect the data in a timely fashion (i.e., when a leak is detected, measurements must be taken more often). Additionally, distribution of this data to all interested parties can be cumbersome. To simplify the vacuum-gauge data collection process, automate the data collection, and decrease the labor costs associated with acquiring these measurements, an automated system that monitors the existing gauges was developed by Invocon, Inc. For this project, Invocon developed a Wireless Integrated Microelectronic Vacuum Sensor System (WIMVSS) that provides the ability to gather vacuum

  12. 31 CFR 248.6 - Recovery of original check.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Recovery of original check. 248.6... § 248.6 Recovery of original check. (a) If the claimant recovers an original check after he has... or agency concerned regarding the negotiability of such original check. (b) In the event the...

  13. CMM Interim Check (U)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Montano, Joshua Daniel

    2015-03-23

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length. Unfortunately, several nonconformance reports have been generated to document the discovery of a certified machine found out of tolerance during a calibration closeout. In an effort to reduce risk to product quality two solutions were proposed – shorten the calibration cycle which could be costly, or perform an interim check to monitor the machine’s performance between cycles. The CMM interimmore » check discussed makes use of Renishaw’s Machine Checking Gauge. This off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. Data was gathered, analyzed, and simulated from seven machines in seventeen different configurations to create statistical process control run charts for on-the-floor monitoring.« less

  14. Fatigue induced cracking in aluminum LN-2 shroud of 39 foot vacuum chamber

    NASA Technical Reports Server (NTRS)

    Edwards, A. A.

    1984-01-01

    Fourteen years after completion of Ford's 39-foot space simulation chamber, leaks began to appear in its LN2 shroud. Although the shroud had been tight since its acceptance, cracks appeared in 1983 in some of the field welds of the one inch tubes which interconnect the LN2 panels. The resulting leaks were large enough to prevent pump down to high vacuum and could be heard easily when the chamber was at ambient conditions. New cracks appeared during each thermal cycle making it impossible to utilize the chamber for thermal vacuum testing. The analysis presented here implies that many, if not all, of the aluminum LN2 shrouds now in use may be in various stages of fatigue failure. The probability is high that fatigue cracks are working through the aluminum tubing in heat-affected zones of some field welds. The cracks may not be apparent yet, but after the shroud has experienced a certain number of thermal cycles these cracks will work through the material and become serious leaks. Fortunately, appropriate planning, analysis, and checking can, with a relatively small expenditure of money, help to avoid large and unexpected shroud failures and keep the chamber operational as long as it is needed.

  15. Running vacuum cosmological models: linear scalar perturbations

    NASA Astrophysics Data System (ADS)

    Perico, E. L. D.; Tamayo, D. A.

    2017-08-01

    In cosmology, phenomenologically motivated expressions for running vacuum are commonly parameterized as linear functions typically denoted by Λ(H2) or Λ(R). Such models assume an equation of state for the vacuum given by bar PΛ = - bar rhoΛ, relating its background pressure bar PΛ with its mean energy density bar rhoΛ ≡ Λ/8πG. This equation of state suggests that the vacuum dynamics is due to an interaction with the matter content of the universe. Most of the approaches studying the observational impact of these models only consider the interaction between the vacuum and the transient dominant matter component of the universe. We extend such models by assuming that the running vacuum is the sum of independent contributions, namely bar rhoΛ = Σibar rhoΛi. Each Λ i vacuum component is associated and interacting with one of the i matter components in both the background and perturbation levels. We derive the evolution equations for the linear scalar vacuum and matter perturbations in those two scenarios, and identify the running vacuum imprints on the cosmic microwave background anisotropies as well as on the matter power spectrum. In the Λ(H2) scenario the vacuum is coupled with every matter component, whereas the Λ(R) description only leads to a coupling between vacuum and non-relativistic matter, producing different effects on the matter power spectrum.

  16. 12 CFR 229.52 - Substitute check warranties.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 12 Banks and Banking 3 2010-01-01 2010-01-01 false Substitute check warranties. 229.52 Section 229.52 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE..., presents, or returns a substitute check (or a paper or electronic representation of a substitute check) for...

  17. 12 CFR 229.52 - Substitute check warranties.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 12 Banks and Banking 3 2011-01-01 2011-01-01 false Substitute check warranties. 229.52 Section 229.52 Banks and Banking FEDERAL RESERVE SYSTEM (CONTINUED) BOARD OF GOVERNORS OF THE FEDERAL RESERVE..., presents, or returns a substitute check (or a paper or electronic representation of a substitute check) for...

  18. 42 CFR 455.436 - Federal database checks.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 42 Public Health 4 2012-10-01 2012-10-01 false Federal database checks. 455.436 Section 455.436....436 Federal database checks. The State Medicaid agency must do all of the following: (a) Confirm the... databases. (b) Check the Social Security Administration's Death Master File, the National Plan and Provider...

  19. 42 CFR 455.436 - Federal database checks.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 42 Public Health 4 2011-10-01 2011-10-01 false Federal database checks. 455.436 Section 455.436....436 Federal database checks. The State Medicaid agency must do all of the following: (a) Confirm the... databases. (b) Check the Social Security Administration's Death Master File, the National Plan and Provider...

  20. 42 CFR 455.436 - Federal database checks.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 42 Public Health 4 2014-10-01 2014-10-01 false Federal database checks. 455.436 Section 455.436....436 Federal database checks. The State Medicaid agency must do all of the following: (a) Confirm the... databases. (b) Check the Social Security Administration's Death Master File, the National Plan and Provider...

  1. 42 CFR 455.436 - Federal database checks.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 42 Public Health 4 2013-10-01 2013-10-01 false Federal database checks. 455.436 Section 455.436....436 Federal database checks. The State Medicaid agency must do all of the following: (a) Confirm the... databases. (b) Check the Social Security Administration's Death Master File, the National Plan and Provider...

  2. Environmental Reality Check.

    ERIC Educational Resources Information Center

    Manicone, Santo

    2001-01-01

    Discusses the importance of educational facilities conducting "reality check" self-audits to uncover the real truth behind underlying environmental problems. An environmental compliance multimedia checklist is included. (GR)

  3. 14 CFR 29.1433 - Vacuum systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Miscellaneous Equipment § 29.1433 Vacuum systems. (a... the discharge lines from the vacuum air pump when the delivery temperature of the air becomes unsafe. (b) Each vacuum air system line and fitting on the discharge side of the pump that might contain...

  4. Vacuum Technology Considerations For Mass Metrology

    PubMed Central

    Abbott, Patrick J.; Jabour, Zeina J.

    2011-01-01

    Vacuum weighing of mass artifacts eliminates the necessity of air buoyancy correction and its contribution to the measurement uncertainty. Vacuum weighing is also an important process in the experiments currently underway for the redefinition of the SI mass unit, the kilogram. Creating the optimum vacuum environment for mass metrology requires careful design and selection of construction materials, plumbing components, pumping, and pressure gauging technologies. We review the vacuum technology1 required for mass metrology and suggest procedures and hardware for successful and reproducible operation. PMID:26989593

  5. 7 CFR 1944.540 - Requesting TSA checks.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 13 2010-01-01 2009-01-01 true Requesting TSA checks. 1944.540 Section 1944.540... TSA checks. (a) The initial TSA check may cover the applicant's needs for the first calendar month. If... the next whole month. (b) The initial advance of TSA grant funds may not be requested simultaneously...

  6. Gas propagation in a liquid helium cooled vacuum tube following a sudden vacuum loss

    NASA Astrophysics Data System (ADS)

    Dhuley, Ram C.

    This dissertation describes the propagation of near atmospheric nitrogen gas that rushes into a liquid helium cooled vacuum tube after the tube suddenly loses vacuum. The loss-of-vacuum scenario resembles accidental venting of atmospheric air to the beam-line of a superconducting radio frequency particle accelerator and is investigated to understand how in the presence of condensation, the in-flowing air will propagate in such geometry. In a series of controlled experiments, room temperature nitrogen gas (a substitute for air) at a variety of mass flow rates was vented to a high vacuum tube immersed in a bath of liquid helium. Pressure probes and thermometers installed on the tube along its length measured respectively the tube pressure and tube wall temperature rise due to gas flooding and condensation. At high mass in-flow rates a gas front propagated down the vacuum tube but with a continuously decreasing speed. Regression analysis of the measured front arrival times indicates that the speed decreases nearly exponentially with the travel length. At low enough mass in-flow rates, no front propagated in the vacuum tube. Instead, the in-flowing gas steadily condensed over a short section of the tube near its entrance and the front appeared to `freeze-out'. An analytical expression is derived for gas front propagation speed in a vacuum tube in the presence of condensation. The analytical model qualitatively explains the front deceleration and flow freeze-out. The model is then simplified and supplemented with condensation heat/mass transfer data to again find the front to decelerate exponentially while going away from the tube entrance. Within the experimental and procedural uncertainty, the exponential decay length-scales obtained from the front arrival time regression and from the simplified model agree.

  7. Developing a vacuum cooking equipment prototype to produce strawberry jam and optimization of vacuum cooking conditions.

    PubMed

    Okut, Dilara; Devseren, Esra; Koç, Mehmet; Ocak, Özgül Özdestan; Karataş, Haluk; Kaymak-Ertekin, Figen

    2018-01-01

    Purpose of this study was to develop prototype cooking equipment that can work at reduced pressure and to evaluate its performance for production of strawberry jam. The effect of vacuum cooking conditions on color soluble solid content, reducing sugars total sugars HMF and sensory properties were investigated. Also, the optimum vacuum cooking conditions for strawberry jam were optimized for Composite Rotatable Design. The optimum cooking temperature and time were determined targeting maximum soluble solid content and sensory attributes (consistency) and minimum Hue value and HMF content. The optimum vacuum cooking conditions determined were 74.4 °C temperature and 19.8 time. The soluble solid content strawberry jam made by vacuum process were similar to those prepared by traditional method. HMF contents of jams produced with vacuum cooking method were well within limit of standards.

  8. 14 CFR 29.1433 - Vacuum systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Vacuum systems. 29.1433 Section 29.1433... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Miscellaneous Equipment § 29.1433 Vacuum systems. (a.... (b) Each vacuum air system line and fitting on the discharge side of the pump that might contain...

  9. 31 CFR 240.12 - Processing of checks.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance:Treasury 2 2011-07-01 2011-07-01 false Processing of checks. 240.12 Section... ON THE UNITED STATES TREASURY General Provisions § 240.12 Processing of checks. (a) Federal Reserve... examination and will provide the presenting bank with a copy or image of the check. Such presenting bank must...

  10. 31 CFR 240.12 - Processing of checks.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 31 Money and Finance:Treasury 2 2013-07-01 2013-07-01 false Processing of checks. 240.12 Section... ON THE UNITED STATES TREASURY General Provisions § 240.12 Processing of checks. (a) Federal Reserve... examination and will provide the presenting bank with a copy or image of the check. Such presenting bank must...

  11. 31 CFR 240.12 - Processing of checks.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Processing of checks. 240.12 Section... ON THE UNITED STATES TREASURY General Provisions § 240.12 Processing of checks. (a) Federal Reserve... examination and will provide the presenting bank with a copy or image of the check. Such presenting bank must...

  12. 31 CFR 240.12 - Processing of checks.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 31 Money and Finance: Treasury 2 2014-07-01 2014-07-01 false Processing of checks. 240.12 Section... ON THE UNITED STATES TREASURY General Provisions § 240.12 Processing of checks. (a) Federal Reserve... examination and will provide the presenting bank with a copy or image of the check. Such presenting bank must...

  13. 31 CFR 240.12 - Processing of checks.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 31 Money and Finance:Treasury 2 2012-07-01 2012-07-01 false Processing of checks. 240.12 Section... ON THE UNITED STATES TREASURY General Provisions § 240.12 Processing of checks. (a) Federal Reserve... examination and will provide the presenting bank with a copy or image of the check. Such presenting bank must...

  14. Vacuum status-display and sector-conditioning programs

    NASA Astrophysics Data System (ADS)

    Skelly, J.; Yen, S.

    1990-08-01

    Two programs have been developed for observation and control of the AGS vacuum system, which include the following notable features: (1) they incorporate a graphical user interface and (2) they are driven by a relational database which describes the vacuum system. The vacuum system comprises some 440 devices organized into 28 vacuum sectors. The status-display program invites menu selection of a sector, interrogates the relational database for relevant vacuum devices, acquires live readbacks and posts a graphical display of their status. The sector-conditioning program likewise invites sector selection, produces the same status display and also implements process control logic on the sector devices to pump the sector down from atmospheric pressure to high vacuum over a period extending several hours. As additional devices are installed in the vacuum system, the devices are added to the relational database; these programs then automatically include the new devices.

  15. Investigation of the dielectric recovery in synthetic air in a high voltage circuit breaker

    NASA Astrophysics Data System (ADS)

    Seeger, M.; Naidis, G.; Steffens, A.; Nordborg, H.; Claessens, M.

    2005-06-01

    The dielectric recovery of an axially blown arc in an experimental set-up based on a conventional HV circuit breaker was investigated both experimentally and theoretically. As a quenching gas, synthetic air was used. The investigated time range was from 10 µs to 10 ms after current zero (CZ). A fast rise in the dielectric strength during the first 100 µs, followed by a plateau and further rise later was observed. The dependences on the breaking current and pressure were determined. The measured dielectric recovery during the first 100 µs after CZ could be reproduced with good accuracy by computational fluid dynamics simulations. From that it could be deduced that the temperature decay in the axis does not depend sensitively on the pressure. The dielectric recovery during the first 100 µs scales therefore mainly with the filling pressure. The plateau in the breakdown characteristic is due to a hot vapour layer from the still evaporating PTFE nozzle surface.

  16. 30 CFR 75.800-2 - Approved circuit schemes.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... necessary protection to the circuits required by § 75.800: (a) Ground check relays may be used for undervoltage protection if the relay coils are designed to trip the circuit breaker when line voltage decreases to 40 percent to 60 percent of the nominal line voltage; (b) Ground trip relays on resistance...

  17. 30 CFR 75.800-2 - Approved circuit schemes.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... necessary protection to the circuits required by § 75.800: (a) Ground check relays may be used for undervoltage protection if the relay coils are designed to trip the circuit breaker when line voltage decreases to 40 percent to 60 percent of the nominal line voltage; (b) Ground trip relays on resistance...

  18. Working in a Vacuum

    ERIC Educational Resources Information Center

    Rathey, Allen

    2005-01-01

    In this article, the author discusses several myths about vacuum cleaners and offers tips on evaluating and purchasing this essential maintenance tool. These myths are: (1) Amps mean performance; (2) Everyone needs high-efficiency particulate air (HEPA): (3) Picking up a "bowling ball" shows cleaning power; (4) All vacuum bags are the same; (5)…

  19. Fiber-coupled LED gas sensor and its application to online monitoring of ecoefficient dielectric insulation gases in high-voltage circuit breakers.

    PubMed

    Kramer, Axel; Over, Daniel; Stoller, Patrick; Paul, Thomas A

    2017-05-20

    Novel dielectric insulation gases used as alternatives to sulfur hexafluoride in gas-insulated switchgear (GIS) include several mixtures containing fluorinated organic compounds. We developed a fiber-optic analyzer enabling concentration measurement of fluoroketones used in medium- and high-voltage switchgear applications by ABB, with concurrent compensation of disturbing effects caused by dust and dirt. The sensor enables measurements in GIS and even in operating high-voltage circuit breakers. The online availability of concentration readings of fluoroketones is important for development tests, but can also be applied for monitoring or diagnostics of field installations.

  20. Effect of the Age Cross-Link Breaker Alagebrium on Anterior Segment Physiology, Morphology, and Ocular Age and Rage

    PubMed Central

    Kiland, Julie A.; Gabelt, B’Ann T.; Tezel, Gülgün; Lütjen-Drecoll, Elke; Kaufman, Paul L.

    2009-01-01

    Purpose: To determine the effects of the advanced glycation end product (AGE) cross-link breaker alagebrium on intraocular pressure (IOP), accommodation (ACC), outflow facility (OF), anterior segment morphology, and ocular AGE and receptors for AGE (RAGE) in older rhesus monkeys. Methods: Six rhesus monkeys (aged 19 to 20 years) received 3 or 4 intracameral and intravitreal (final concentration, 1 mM) injections of alagebrium to one eye over 2.5 to 3 weeks and vehicle to the opposite eye. ACC and OF responses to intramuscular or intravenous pilocarpine were measured at baseline and at 1 to 2 weeks and 2, 4, and 6 months postinjection. IOP was measured prior to all injections, ACC, and OF measurements. Monkeys were euthanized 3 to 6 months after the last injection, the eyes were enucleated, and anterior and posterior segments were examined by electron microscopy or immunohistochemistry. Results: No significant differences were found in ACC or IOP at any time point after alagebrium treatment. Baseline OF was higher (37.0 ± 6.0%; P ≤ .005) in alagebrium-treated vs control eyes at 6 months postinjection. In 3 monkeys, alagebrium-treated eyes, compared to control eyes, showed greater focal plaque formation, similar to that seen in primary open-angle glaucoma, in the juxtacanalicular meshwork/inner wall of Schlemm’s canal. No changes in anterior segment AGE or RAGE were detectable. However, some areas of the retina and optic nerve head exhibited decreased AGE and increased RAGE immunostaining. Conclusions: Intraocular injection of AGE cross-link breakers is an unlikely approach for glaucoma therapy. However, it may generate a model for further study of glaucomatous-like plaque formation. Immunohistochemical changes in the posterior segment in response to alagebrium warrant further functional studies. PMID:20126491

  1. Assessing the Implementation Fidelity of Check-In Check-Out Behavioral Interventions in Elementary and Middle Schools

    ERIC Educational Resources Information Center

    Ruiz, María Isolina; Smith, Traci N.; Naquin, Gale M.; Morgan-D'Atrio, Cynthia; Dellinger, Amy B.

    2014-01-01

    Implementation fidelity is crucial to the success of behavioral interventions. However, measuring and maintaining intervention implementation fidelity in schools' natural settings can be challenging. This article reports findings from a study examining the implementation fidelity of check-in check-out interventions at an urban school district…

  2. Nonperturbative vacuum polarization effects in two-dimensional supercritical Dirac-Coulomb system I. Vacuum charge density

    NASA Astrophysics Data System (ADS)

    Davydov, A.; Sveshnikov, K.; Voronina, Yu.

    2018-01-01

    Based on the original combination of analytical methods, computer algebra tools and numerical calculations, proposed recently in Refs. 1-3, the nonperturbative vacuum polarization effects in the 2+1D supercritical Dirac-Coulomb system with Z > Zcr,1 are explored. Both the vacuum charge density ρV P(r→) and vacuum energy ℰV P are considered. The main result of the work is that in the overcritical region ℰV P turns out to be a rapidly decreasing function ˜-ηeffZ3/R with ηeff > 0 and R being the size of the external Coulomb source. Due to a lot of details of calculation the whole work is divided into two parts I and II. In the present part I, we consider the evaluation and behavior of the vacuum density ρV P, which further is used in part II for evaluation of the vacuum energy, with emphasis on the renormalization, convergence of the partial expansion for ρV P and behavior of the integral induced charge QV P in the overcritical region.

  3. Addressing Dynamic Issues of Program Model Checking

    NASA Technical Reports Server (NTRS)

    Lerda, Flavio; Visser, Willem

    2001-01-01

    Model checking real programs has recently become an active research area. Programs however exhibit two characteristics that make model checking difficult: the complexity of their state and the dynamic nature of many programs. Here we address both these issues within the context of the Java PathFinder (JPF) model checker. Firstly, we will show how the state of a Java program can be encoded efficiently and how this encoding can be exploited to improve model checking. Next we show how to use symmetry reductions to alleviate some of the problems introduced by the dynamic nature of Java programs. Lastly, we show how distributed model checking of a dynamic program can be achieved, and furthermore, how dynamic partitions of the state space can improve model checking. We support all our findings with results from applying these techniques within the JPF model checker.

  4. 27 CFR 70.101 - Bad checks.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... paid as a penalty by the person who tendered such check, upon notice and demand, in the same manner as... is less than $500, the penalty under this section shall be $5 or the amount of such check, whichever...

  5. 27 CFR 70.101 - Bad checks.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... paid as a penalty by the person who tendered such check, upon notice and demand, in the same manner as... is less than $500, the penalty under this section shall be $5 or the amount of such check, whichever...

  6. Nonperturbative vacuum polarization effects in two-dimensional supercritical Dirac-Coulomb system II. Vacuum energy

    NASA Astrophysics Data System (ADS)

    Davydov, A.; Sveshnikov, K.; Voronina, Yu.

    2018-01-01

    Nonperturbative vacuum polarization effects are explored for a supercritical Dirac-Coulomb system with Z > Zcr,1 in 2+1D, based on the original combination of analytical methods, computer algebra and numerical calculations, proposed recently in Refs. 1-3. Both the vacuum charge density ρV P(r→) and vacuum energy ℰV P are considered. Due to a lot of details of calculation the whole work is divided into two parts I and II. Taking account of results, obtained in the part I4 for ρV P, in the present part II, the evaluation of the vacuum energy ℰV P is investigated with emphasis on the renormalization and convergence of the partial expansion for ℰV P. It is shown that the renormalization via fermionic loop turns out to be the universal tool, which removes the divergence of the theory both in the purely perturbative and essentially nonperturbative regimes of the vacuum polarization. The main result of calculation is that for a wide range of the system parameters in the overcritical region ℰV P turns out to be a rapidly decreasing function ˜-ηeffZ3/R with ηeff > 0 and R being the size of the external Coulomb source. To the end the similarity in calculations of ℰV P in 2+1 and 3+1D is discussed, and qualitative arguments are presented in favor of the possibility for complete screening of the classical electrostatic energy of the Coulomb source by the vacuum polarization effects for Z ≫ Zcr,1 in 3+1D.

  7. Quantum vacuum noise in physics and cosmology.

    PubMed

    Davies, P. C. W.

    2001-09-01

    The concept of the vacuum in quantum field theory is a subtle one. Vacuum states have a rich and complex set of properties that produce distinctive, though usually exceedingly small, physical effects. Quantum vacuum noise is familiar in optical and electronic devices, but in this paper I wish to consider extending the discussion to systems in which gravitation, or large accelerations, are important. This leads to the prediction of vacuum friction: The quantum vacuum can act in a manner reminiscent of a viscous fluid. One result is that rapidly changing gravitational fields can create particles from the vacuum, and in turn the backreaction on the gravitational dynamics operates like a damping force. I consider such effects in early universe cosmology and the theory of quantum black holes, including the possibility that the large-scale structure of the universe might be produced by quantum vacuum noise in an early inflationary phase. I also discuss the curious phenomenon that an observer who accelerates through a quantum vacuum perceives a bath of thermal radiation closely analogous to Hawking radiation from black holes, even though an inertial observer registers no particles. The effects predicted raise very deep and unresolved issues about the nature of quantum particles, the role of the observer, and the relationship between the quantum vacuum and the concepts of information and entropy. (c) 2001 American Institute of Physics.

  8. 14 CFR 135.339 - Initial and transition training and checking: Check airmen (aircraft), check airmen (simulator).

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... an aircraft, in a flight simulator, or in a flight training device. This paragraph applies after... accomplished in full or in part in flight, in a flight simulator, or in a flight training device, as appropriate. (g) The initial and transition flight training for check airmen (simulator) must include the...

  9. 14 CFR 135.339 - Initial and transition training and checking: Check airmen (aircraft), check airmen (simulator).

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... an aircraft, in a flight simulator, or in a flight training device. This paragraph applies after... accomplished in full or in part in flight, in a flight simulator, or in a flight training device, as appropriate. (g) The initial and transition flight training for check airmen (simulator) must include the...

  10. 14 CFR 135.339 - Initial and transition training and checking: Check airmen (aircraft), check airmen (simulator).

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... an aircraft, in a flight simulator, or in a flight training device. This paragraph applies after... accomplished in full or in part in flight, in a flight simulator, or in a flight training device, as appropriate. (g) The initial and transition flight training for check airmen (simulator) must include the...

  11. 14 CFR 135.339 - Initial and transition training and checking: Check airmen (aircraft), check airmen (simulator).

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... an aircraft, in a flight simulator, or in a flight training device. This paragraph applies after... accomplished in full or in part in flight, in a flight simulator, or in a flight training device, as appropriate. (g) The initial and transition flight training for check airmen (simulator) must include the...

  12. 14 CFR 135.339 - Initial and transition training and checking: Check airmen (aircraft), check airmen (simulator).

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... an aircraft, in a flight simulator, or in a flight training device. This paragraph applies after... accomplished in full or in part in flight, in a flight simulator, or in a flight training device, as appropriate. (g) The initial and transition flight training for check airmen (simulator) must include the...

  13. Running vacuum cosmological models: linear scalar perturbations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Perico, E.L.D.; Tamayo, D.A., E-mail: elduartep@usp.br, E-mail: tamayo@if.usp.br

    In cosmology, phenomenologically motivated expressions for running vacuum are commonly parameterized as linear functions typically denoted by Λ( H {sup 2}) or Λ( R ). Such models assume an equation of state for the vacuum given by P-bar {sub Λ} = - ρ-bar {sub Λ}, relating its background pressure P-bar {sub Λ} with its mean energy density ρ-bar {sub Λ} ≡ Λ/8π G . This equation of state suggests that the vacuum dynamics is due to an interaction with the matter content of the universe. Most of the approaches studying the observational impact of these models only consider the interactionmore » between the vacuum and the transient dominant matter component of the universe. We extend such models by assuming that the running vacuum is the sum of independent contributions, namely ρ-bar {sub Λ} = Σ {sub i} ρ-bar {sub Λ} {sub i} . Each Λ i vacuum component is associated and interacting with one of the i matter components in both the background and perturbation levels. We derive the evolution equations for the linear scalar vacuum and matter perturbations in those two scenarios, and identify the running vacuum imprints on the cosmic microwave background anisotropies as well as on the matter power spectrum. In the Λ( H {sup 2}) scenario the vacuum is coupled with every matter component, whereas the Λ( R ) description only leads to a coupling between vacuum and non-relativistic matter, producing different effects on the matter power spectrum.« less

  14. Vacuum phonon tunneling.

    PubMed

    Altfeder, Igor; Voevodin, Andrey A; Roy, Ajit K

    2010-10-15

    Field-induced phonon tunneling, a previously unknown mechanism of interfacial thermal transport, has been revealed by ultrahigh vacuum inelastic scanning tunneling microscopy (STM). Using thermally broadened Fermi-Dirac distribution in the STM tip as in situ atomic-scale thermometer we found that thermal vibrations of the last tip atom are effectively transmitted to sample surface despite few angstroms wide vacuum gap. We show that phonon tunneling is driven by interfacial electric field and thermally vibrating image charges, and its rate is enhanced by surface electron-phonon interaction.

  15. 21 CFR 884.4340 - Fetal vacuum extractor.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... means of a suction cup attached to the scalp and is powered by an external vacuum source. This generic type of device may include the cup, hosing, vacuum source, and vacuum control. (b) Classification...

  16. 21 CFR 884.4340 - Fetal vacuum extractor.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... means of a suction cup attached to the scalp and is powered by an external vacuum source. This generic type of device may include the cup, hosing, vacuum source, and vacuum control. (b) Classification...

  17. Refined tip preparation by electrochemical etching and ultrahigh vacuum treatment to obtain atomically sharp tips for scanning tunneling microscope and atomic force microscope.

    PubMed

    Hagedorn, Till; El Ouali, Mehdi; Paul, William; Oliver, David; Miyahara, Yoichi; Grütter, Peter

    2011-11-01

    A modification of the common electrochemical etching setup is presented. The described method reproducibly yields sharp tungsten tips for usage in the scanning tunneling microscope and tuning fork atomic force microscope. In situ treatment under ultrahigh vacuum (p ≤10(-10) mbar) conditions for cleaning and fine sharpening with minimal blunting is described. The structure of the microscopic apex of these tips is atomically resolved with field ion microscopy and cross checked with field emission. © 2011 American Institute of Physics

  18. Cold cathode vacuum gauging system

    DOEpatents

    Denny, Edward C.

    2004-03-09

    A vacuum gauging system of the cold cathode type is provided for measuring the pressure of a plurality of separate vacuum systems, such as in a gas centrifuge cascade. Each casing is fitted with a gauge tube assembly which communicates with the vacuum system in the centrifuge casing. Each gauge tube contains an anode which may be in the form of a slender rod or wire hoop and a cathode which may be formed by the wall of the gauge tube. The tube is provided with an insulated high voltage connector to the anode which has a terminal for external connection outside the vacuum casing. The tube extends from the casing so that a portable magnet assembly may be inserted about the tube to provide a magnetic field in the area between the anode and cathode necessary for pressure measurements in a cold cathode-type vacuum gauge arrangement. The portable magnetic assembly is provided with a connector which engages the external high voltage terminal for providing power to the anode within in the gauge tube. Measurement is made in the same manner as the prior cold cathode gauges in that the current through the anode to the cathode is measured as an indication of the pressure. By providing the portable magnetic assembly, a considerable savings in cost, installation, and maintenance of vacuum gauges for pressure measurement in a gas centrifuge cascade is realizable.

  19. Computational Fact Checking from Knowledge Networks

    PubMed Central

    Ciampaglia, Giovanni Luca; Shiralkar, Prashant; Rocha, Luis M.; Bollen, Johan; Menczer, Filippo; Flammini, Alessandro

    2015-01-01

    Traditional fact checking by expert journalists cannot keep up with the enormous volume of information that is now generated online. Computational fact checking may significantly enhance our ability to evaluate the veracity of dubious information. Here we show that the complexities of human fact checking can be approximated quite well by finding the shortest path between concept nodes under properly defined semantic proximity metrics on knowledge graphs. Framed as a network problem this approach is feasible with efficient computational techniques. We evaluate this approach by examining tens of thousands of claims related to history, entertainment, geography, and biographical information using a public knowledge graph extracted from Wikipedia. Statements independently known to be true consistently receive higher support via our method than do false ones. These findings represent a significant step toward scalable computational fact-checking methods that may one day mitigate the spread of harmful misinformation. PMID:26083336

  20. Measurement of partial pressures in vacuum technology and vacuum physics

    NASA Technical Reports Server (NTRS)

    Huber, W. K.

    1986-01-01

    It is pointed out that the measurement of gaseous pressures of less than 0.0001 torr is based on the ionization of gas atoms and molecules due to collisions with electrons. The particle density is determined in place of the pressure. The ionization cross sections for molecules of various gases are discussed. It is found that the true pressure in a vacuum system cannot be determined with certainty if it is unknown which gas is present. Effects of partial pressure determination on the condition of the vacuum system are discussed together with ion sources, systems of separation, and ion detection.

  1. VACUUM TRAP AND VALVE COMBINATION

    DOEpatents

    Milleron, N.; Levenson, L.

    1963-02-19

    This patent relates to a vacuum trap and valve combination suitable for use in large ultra-high vacuum systems. The vacuum trap is a chamber having an inlet and outlet opening which may be made to communicate with a chamber to be evacuated and a diffusion pump, respectively. A valve is designed to hermeticaliy seal with inlet opening and, when opened, block the line-of- sight'' between the inlet and outlet openings, while allowing a large flow path between the opened vaive and the side walls of the trap. The interior of the trap and the side of the valve facing the inlet opening are covered with an impurity absorbent, such as Zeolite or activated aluminum. Besides the advantage of combining two components of a vacuum system into one, the present invention removes the need for a baffle between the pump and the chamber to be evacuated. In one use of a specific embodiment of this invention, the transmission probability was 45 and the partial pressure of the pump fluid vapor in the vacuum chamber was at least 100 times lower than its vapor pressure. (AEC)

  2. 31 CFR 245.8 - Receipt or recovery of original check.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Receipt or recovery of original check... CHECKS § 245.8 Receipt or recovery of original check. (a) If the original check is received or recovered... of instructions with respect to the negotiability of such check. (b) If the original check is...

  3. 36 CFR 504.12 - Items to be checked.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 504.12 Parks, Forests, and Public Property SMITHSONIAN INSTITUTION RULES AND REGULATIONS GOVERNING SMITHSONIAN INSTITUTION BUILDINGS AND GROUNDS § 504.12 Items to be checked. Umbrellas, canes (not needed to... to be checked in buildings where checking facilities are provided. ...

  4. Vacuum enhanced cutaneous biopsy instrument

    DOEpatents

    Collins, Joseph

    2000-01-01

    A syringe-like disposable cutaneous biopsy instrument equipped with a tubular blade at its lower end, and designed so that a vacuum is created during use, said vacuum serving to retain undeformed a plug of tissue cut from a patient's skin.

  5. Annual Check-up

    MedlinePlus

    ... Guides Quizzes Parents About Us Donate General Health Sexual Health Medical Conditions Nutrition & Fitness Emotional Health Annual Check- ... re under the age of 18. Issues about sexual health, HIV, and STIs will be kept confidential. How ...

  6. Troubleshooting crude vacuum tower overhead ejector systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lines, J.R.; Frens, L.L.

    1995-03-01

    Routinely surveying tower overhead vacuum systems can improve performance and product quality. These vacuum systems normally provide reliable and consistent operation. However, process conditions, supplied utilities, corrosion, erosion and fouling all have an impact on ejector system performance. Refinery vacuum distillation towers use ejector systems to maintain tower top pressure and remove overhead gases. However, as with virtually all refinery equipment, performance may be affected by a number of variables. These variables may act independently or concurrently. It is important to understand basic operating principles of vacuum systems and how performance is affected by: utilities, corrosion and erosion, fouling, andmore » process conditions. Reputable vacuum-system suppliers have service engineers that will come to a refinery to survey the system and troubleshoot performance or offer suggestions for improvement. A skilled vacuum-system engineer may be needed to diagnose and remedy system problems. The affect of these variables on performance is discussed. A case history is described of a vacuum system on a crude tower in a South American refinery.« less

  7. 14 CFR 121.413 - Initial and transition training and checking requirements: Check airmen (airplane), check airmen...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... accomplished in part or in full in an airplane, in a flight simulator, or in a flight training device. This... accomplished in full or in part in flight, in a flight simulator, or in a flight training device, as appropriate. (g) The initial and transition flight training for check airmen (simulator) must include the...

  8. 14 CFR 121.413 - Initial and transition training and checking requirements: Check airmen (airplane), check airmen...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... accomplished in part or in full in an airplane, in a flight simulator, or in a flight training device. This... accomplished in full or in part in flight, in a flight simulator, or in a flight training device, as appropriate. (g) The initial and transition flight training for check airmen (simulator) must include the...

  9. 14 CFR 121.413 - Initial and transition training and checking requirements: Check airmen (airplane), check airmen...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... accomplished in part or in full in an airplane, in a flight simulator, or in a flight training device. This... accomplished in full or in part in flight, in a flight simulator, or in a flight training device, as appropriate. (g) The initial and transition flight training for check airmen (simulator) must include the...

  10. 14 CFR 121.413 - Initial and transition training and checking requirements: Check airmen (airplane), check airmen...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... accomplished in part or in full in an airplane, in a flight simulator, or in a flight training device. This... accomplished in full or in part in flight, in a flight simulator, or in a flight training device, as appropriate. (g) The initial and transition flight training for check airmen (simulator) must include the...

  11. Optimization of Multilayer Laminated Film and Absorbent of Vacuum Insulation Panel for Use at High Temperature

    NASA Astrophysics Data System (ADS)

    Araki, Kuninari; Echigoya, Wataru; Tsuruga, Toshimitsu; Kamoto, Daigorou; Matsuoka, Shin-Ichi

    For the energy saving regulation and larger capacity, Vacuum Insulation Panel (VIP) has been used in refrigerators with urethane foam in recent years. VIP for low temperature is constructed by laminated plastic film, using heat welding of each neighboring part for keeping vacuum, so that the performance decrement is very large under high temperature. But recently high efficiency insulation material is desired for high temperature water holding devices (automatic vending machine, heat pump water heater, electric hot-water pot water, etc.), and we especially focused on cost and ability of the laminated plastic film and absorbent for high temperature VIP. We measured the heatproof temperature of plastic films and checked the amount of water vapor and out coming gas on temperature-programmed adsorption in absorbent. These results suggest the suitable laminated film and absorbent system for VIP use at high temperature, and the long-term reliability was evaluated by measuring thermal conductivity of high temperature. As a result it was found that high-retort pouch of CPP (cast polypropylene film) and adding of aluminum coating are the most suitable materials for use in the welded layers of high-temperature VIPs (105°C).

  12. Vapor-barrier Vacuum Isolation System

    NASA Technical Reports Server (NTRS)

    Weinstein, Leonard M. (Inventor); Taminger, Karen M. (Inventor)

    2014-01-01

    A system includes a collimated beam source within a vacuum chamber, a condensable barrier gas, cooling material, a pump, and isolation chambers cooled by the cooling material to condense the barrier gas. Pressure levels of each isolation chamber are substantially greater than in the vacuum chamber. Coaxially-aligned orifices connect a working chamber, the isolation chambers, and the vacuum chamber. The pump evacuates uncondensed barrier gas. The barrier gas blocks entry of atmospheric vapor from the working chamber into the isolation chambers, and undergoes supersonic flow expansion upon entering each isolation chamber. A method includes connecting the isolation chambers to the vacuum chamber, directing vapor to a boundary with the working chamber, and supersonically expanding the vapor as it enters the isolation chambers via the orifices. The vapor condenses in each isolation chamber using the cooling material, and uncondensed vapor is pumped out of the isolation chambers via the pump.

  13. 32 CFR 635.6 - Name checks.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... with AR 340-21. (b) Checks will be accomplished by a review of the COPS MPRS. Information will be... agencies for counterintelligence purposes. (d) COPS MPRS is a database, which will contain all military police reports filed worldwide. Authorized users of COPS MPRS can conduct name checks for criminal...

  14. 32 CFR 635.6 - Name checks.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... with AR 340-21. (b) Checks will be accomplished by a review of the COPS MPRS. Information will be... agencies for counterintelligence purposes. (d) COPS MPRS is a database, which will contain all military police reports filed worldwide. Authorized users of COPS MPRS can conduct name checks for criminal...

  15. 32 CFR 635.6 - Name checks.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... with AR 340-21. (b) Checks will be accomplished by a review of the COPS MPRS. Information will be... agencies for counterintelligence purposes. (d) COPS MPRS is a database, which will contain all military police reports filed worldwide. Authorized users of COPS MPRS can conduct name checks for criminal...

  16. 46 CFR 10.214 - Security Check.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 1 2011-10-01 2011-10-01 false Security Check. 10.214 Section 10.214 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN MERCHANT MARINER CREDENTIAL General Requirements for All Merchant Mariner Credentials § 10.214 Security Check. Until April 15, 2009...

  17. 46 CFR 10.214 - Security Check.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 1 2010-10-01 2010-10-01 false Security Check. 10.214 Section 10.214 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY MERCHANT MARINE OFFICERS AND SEAMEN MERCHANT MARINER CREDENTIAL General Requirements for All Merchant Mariner Credentials § 10.214 Security Check. Until April 15, 2009...

  18. 7 CFR 58.423 - Cheese vacuumizing chamber.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Cheese vacuumizing chamber. 58.423 Section 58.423 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards....423 Cheese vacuumizing chamber. The vacuum chamber shall be satisfactorily constructed and maintained...

  19. 7 CFR 58.423 - Cheese vacuumizing chamber.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Cheese vacuumizing chamber. 58.423 Section 58.423 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards....423 Cheese vacuumizing chamber. The vacuum chamber shall be satisfactorily constructed and maintained...

  20. Found Poems, Member Checking and Crises of Representation

    ERIC Educational Resources Information Center

    Reilly, Rosemary C.

    2013-01-01

    In order to establish veracity, qualitative researchers frequently rely on member checks to insure credibility by giving participants opportunities to correct errors, challenge interpretations and assess results; however, member checks are not without drawbacks. This paper describes an innovative approach to conducting member checks. Six members…

  1. Engineering Matter Interactions Using Squeezed Vacuum

    NASA Astrophysics Data System (ADS)

    Zeytinoǧlu, Sina; Imamoǧlu, Ataç; Huber, Sebastian

    2017-04-01

    Virtually all interactions that are relevant for atomic and condensed matter physics are mediated by quantum fluctuations of the electromagnetic field vacuum. Consequently, controlling the vacuum fluctuations can be used to engineer the strength and the range of interactions. Recent experiments have used this premise to demonstrate novel quantum phases or entangling gates by embedding electric dipoles in photonic cavities or wave guides, which modify the electromagnetic fluctuations. Here, we show theoretically that the enhanced fluctuations in the antisqueezed quadrature of a squeezed vacuum state allow for engineering interactions between electric dipoles without the need for a photonic structure. Thus, the strength and range of the interactions can be engineered in a time-dependent way by changing the spatial profile of the squeezed vacuum in a traveling-wave geometry, which also allows the implementation of chiral dissipative interactions. Using experimentally realized squeezing parameters and including realistic losses, we predict single-atom cooperativities C of up to 10 for the squeezed-vacuum-enhanced interactions.

  2. Lightweight Vacuum Jacket for Cryogenic Insulation. Volume 1

    NASA Technical Reports Server (NTRS)

    Barclay, D. L.; Bell, J. E.; Brogren, E. W.; Straayer, J. W.

    1975-01-01

    The feasibility of producing a lightweight vacuum jacket using state-of-the-art technology and materials was examined. Design and analytical studies were made on a full-scale, orbital maneuvering system fuel tank. Preliminary design details were made for the tank assembly, including an optimized vacuum jacket and multilayer insulation system. A half-scale LH2 test model was designed and fabricated, and a force/stiffness proof test was conducted on the vacuum jacket. A vacuum leak rate of .000001 atmosphere ml of helium per second was measured, approximately 1500 hours of vacuum pressure were sustained, and 29 vacuum-pressure cycles were experienced prior to failure.

  3. 7 CFR 305.29 - Vacuum heat treatment schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Vacuum heat treatment schedule. 305.29 Section 305.29... SERVICE, DEPARTMENT OF AGRICULTURE PHYTOSANITARY TREATMENTS Heat Treatments § 305.29 Vacuum heat treatment... vacuum at 8 hours. Maintain the vacuum until the end of the treatment. Gradually increase the temperature...

  4. [The evolution of vacuum extraction in obstetrics].

    PubMed

    Nikolov, A

    2010-01-01

    Vacuum extraction is one of the methods for assisted vaginal delivery. In this article the evolution of vacuum extraction in obstetrics is been discussed. Historical facts and data from the invention up to state-of-the-art vacuum systems in modern obstetrics are presented.

  5. Evaluation of a Prototype Hybrid Vacuum Pump to Provide Vacuum-Assisted Suspension for Above-Knee Prostheses

    PubMed Central

    Major, Matthew J.; Caldwell, Ryan; Fatone, Stefania

    2015-01-01

    Vacuum-assisted suspension (VAS) of prosthetic sockets utilizes a pump to evacuate air from between the prosthetic liner and socket, and are available as mechanical or electric systems. This technical note describes a hybrid pump that benefits from the advantages of mechanical and electric systems, and evaluates a prototype as proof-of-concept. Cyclical bench testing of the hybrid pump mechanical system was performed using a materials testing system to assess the relationship between compression cycles and vacuum pressure. Phase 1 in vivo testing of the hybrid pump was performed by an able-bodied individual using prosthesis simulator boots walking on a treadmill, and phase 2 involved an above-knee prosthesis user walking with the hybrid pump and a commercial electric pump for comparison. Bench testing of 300 compression cycles produced a maximum vacuum of 24 in-Hg. In vivo testing demonstrated that the hybrid pump continued to pull vacuum during walking, and as opposed to the commercial electric pump, did not require reactivation of the electric system during phase 2 testing. The novelty of the hybrid pump is that while the electric system provides rapid, initial vacuum suspension, the mechanical system provides continuous air evacuation while walking to maintain suspension without reactivation of the electric system, thereby allowing battery power to be reserved for monitoring vacuum levels. PMID:27462383

  6. 14 CFR 121.441 - Proficiency checks.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... certificate holder may use any person nor may any person serve as a required pilot flight crewmember unless that person has satisfactorily completed either a proficiency check, or an approved simulator course of... check or the simulator training. (2) For all other pilots— (i) Within the preceding 24 calendar months...

  7. 14 CFR 121.441 - Proficiency checks.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... certificate holder may use any person nor may any person serve as a required pilot flight crewmember unless that person has satisfactorily completed either a proficiency check, or an approved simulator course of... check or the simulator training. (2) For all other pilots— (i) Within the preceding 24 calendar months...

  8. Tractor Mechanic Check Sheets for Modules.

    ERIC Educational Resources Information Center

    Clemson Univ., SC. Vocational Education Media Center.

    Forms for student self-checks and the instructor's final checklist (student evaluation) are provided for use with thirty-three learning modules on maintaining and servicing fuel and electrical systems in tractor mechanics. The student self-check asks the students questions about their understanding of the modules' content. The instructor's…

  9. 7 CFR 58.243 - Checking quality.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Checking quality. 58.243 Section 58.243 Agriculture... Procedures § 58.243 Checking quality. All milk, milk products and dry milk products shall be subject to inspection and analysis by the dairy plant for quality and condition throughout each processing operation...

  10. Gravitational collapse and the vacuum energy

    NASA Astrophysics Data System (ADS)

    Campos, M.

    2014-03-01

    To explain the accelerated expansion of the universe, models with interacting dark components (dark energy and dark matter) have been considered recently in the literature. Generally, the dark energy component is physically interpreted as the vacuum energy of the all fields that fill the universe. As the other side of the same coin, the influence of the vacuum energy on the gravitational collapse is of great interest. We study such collapse adopting different parameterizations for the evolution of the vacuum energy. We discuss the homogeneous collapsing star fluid, that interacts with a vacuum energy component, using the stiff matter case as example. We conclude this work with a discussion of the Cahill-McVittie mass for the collapsed object.

  11. Gravitational baryogenesis in running vacuum models

    NASA Astrophysics Data System (ADS)

    Oikonomou, V. K.; Pan, Supriya; Nunes, Rafael C.

    2017-08-01

    We study the gravitational baryogenesis mechanism for generating baryon asymmetry in the context of running vacuum models. Regardless of whether these models can produce a viable cosmological evolution, we demonstrate that they produce a nonzero baryon-to-entropy ratio even if the universe is filled with conformal matter. This is a sound difference between the running vacuum gravitational baryogenesis and the Einstein-Hilbert one, since in the latter case, the predicted baryon-to-entropy ratio is zero. We consider two well known and most used running vacuum models and show that the resulting baryon-to-entropy ratio is compatible with the observational data. Moreover, we also show that the mechanism of gravitational baryogenesis may constrain the running vacuum models.

  12. Testing Intelligently Includes Double-Checking Wechsler IQ Scores

    ERIC Educational Resources Information Center

    Kuentzel, Jeffrey G.; Hetterscheidt, Lesley A.; Barnett, Douglas

    2011-01-01

    The rigors of standardized testing make for numerous opportunities for examiner error, including simple computational mistakes in scoring. Although experts recommend that test scoring be double-checked, the extent to which independent double-checking would reduce scoring errors is not known. A double-checking procedure was established at a…

  13. Recovery of materials from waste printed circuit boards by vacuum pyrolysis and vacuum centrifugal separation.

    PubMed

    Zhou, Yihui; Wu, Wenbiao; Qiu, Keqiang

    2010-11-01

    In this research, a two-step process consisting of vacuum pyrolysis and vacuum centrifugal separation was employed to treat waste printed circuit boards (WPCBs). Firstly, WPCBs were pyrolysed under vacuum condition at 600 °C for 30 min in a lab-scale reactor. Then, the obtained pyrolysis residue was heated under vacuum until the solder was melted, and then the molten solder was separated from the pyrolysis residue by the centrifugal force. The results of vacuum pyrolysis showed that the type-A of WPCBs (the base plates of which was made from cellulose paper reinforced phenolic resin) pyrolysed to form an average of 67.97 wt.% residue, 27.73 wt.% oil, and 4.30 wt.% gas; and pyrolysis of the type-B of WPCBs (the base plates of which was made from glass fiber reinforced epoxy resin) led to an average mass balance of 72.20 wt.% residue, 21.45 wt.% oil, and 6.35 wt.% gas. The results of vacuum centrifugal separation showed that the separation of solder was complete when the pyrolysis residue was heated at 400 °C, and the rotating drum was rotated at 1200 rpm for 10 min. The pyrolysis oil and gas can be used as fuel or chemical feedstock after treatment. The pyrolysis residue after solder separation contained various metals, glass fibers and other inorganic materials, which could be recycled for further processing. The recovered solder can be reused directly and it can also be a good resource of lead and tin for refining. Copyright © 2010 Elsevier Ltd. All rights reserved.

  14. Diffraction-limited storage-ring vacuum technology

    PubMed Central

    Al-Dmour, Eshraq; Ahlback, Jonny; Einfeld, Dieter; Tavares, Pedro Fernandes; Grabski, Marek

    2014-01-01

    Some of the characteristics of recent ultralow-emittance storage-ring designs and possibly future diffraction-limited storage rings are a compact lattice combined with small magnet apertures. Such requirements present a challenge for the design and performance of the vacuum system. The vacuum system should provide the required vacuum pressure for machine operation and be able to handle the heat load from synchrotron radiation. Small magnet apertures result in the conductance of the chamber being low, and lumped pumps are ineffective. One way to provide the required vacuum level is by distributed pumping, which can be realised by the use of a non-evaporable getter (NEG) coating of the chamber walls. It may not be possible to use crotch absorbers to absorb the heat from the synchrotron radiation because an antechamber is difficult to realise with such a compact lattice. To solve this, the chamber walls can work as distributed absorbers if they are made of a material with good thermal conductivity, and distributed cooling is used at the location where the synchrotron radiation hits the wall. The vacuum system of the 3 GeV storage ring of MAX IV is used as an example of possible solutions for vacuum technologies for diffraction-limited storage rings. PMID:25177979

  15. Electric Propulsion Laboratory Vacuum Chamber

    NASA Image and Video Library

    1964-06-21

    Engineer Paul Reader and his colleagues take environmental measurements during testing of a 20-inch diameter ion engine in a vacuum tank at the Electric Propulsion Laboratory (EPL). Researchers at the Lewis Research Center were investigating the use of a permanent-magnet circuit to create the magnetic field required power electron bombardment ion engines. Typical ion engines use a solenoid coil to create this magnetic field. It was thought that the substitution of a permanent magnet would create a comparable magnetic field with a lower weight. Testing of the magnet system in the EPL vacuum tanks revealed no significant operational problems. Reader found the weight of the two systems was similar, but that the thruster’s efficiency increased with the magnet. The EPL contained a series of large vacuum tanks that could be used to simulate conditions in space. Large vacuum pumps reduced the internal air pressure, and a refrigeration system created the cryogenic temperatures found in space.

  16. 7 CFR 1421.11 - Spot checks.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 10 2010-01-01 2010-01-01 false Spot checks. 1421.11 Section 1421.11 Agriculture... ASSISTANCE LOANS AND LOAN DEFICIENCY PAYMENTS FOR 2008 THROUGH 2012 General § 1421.11 Spot checks. (a) CCC... CCC access to the farm and storage facility as necessary to conduct collateral inspections, or “spot...

  17. A No-Arc DC Circuit Breaker Based on Zero-Current Interruption

    NASA Astrophysics Data System (ADS)

    Xiang, Xuewei; Chai, Jianyun; Sun, Xudong

    2017-05-01

    A dc system has no natural current zero-crossing point, so a dc arc is more difficult to extinguish than an ac arc. In order to effectively solve the problem of the dc arc, this paper proposes a dc circuit breaker (DCCB) capable of implementing a no-arc interruption. The proposed DCCB includes a main branch consisting of a mechanical switch, a diode and a current-limiting inductor, a semi-period resonance circuit consisting of a diode, an inductor and a capacitor, and a buffer branch consisting of a capacitor, a thyristor and a resistor. The mechanical switch is opened in a zero-current state, and the overvoltage caused by the counter electromotive force of the inductor does not exist. Meanwhile, the capacitor has a buffering effect on the voltage. The rising of the voltage of the mechanical switch is slower than the rising of the insulating strength of a contact gap of the mechanical switch, resulting in the contact gap not able to be broken down. Thus, the arc cannot be generated. The simulation results show that the proposed DCCB does not generate the arc in the interruption process, the rise rate of the short circuit current can be effectively limited, and the short circuit fault point can be rapidly isolated from the dc power supply.

  18. 31 CFR 240.16 - Checks issued to minor payees.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 31 Money and Finance:Treasury 2 2011-07-01 2011-07-01 false Checks issued to minor payees. 240.16... ON THE UNITED STATES TREASURY Indorsement of Checks § 240.16 Checks issued to minor payees. (a) Checks in payment of principal and/or interest on U.S. securities that are issued to minors may be...

  19. 31 CFR 240.16 - Checks issued to minor payees.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 31 Money and Finance: Treasury 2 2010-07-01 2010-07-01 false Checks issued to minor payees. 240.16... ON THE UNITED STATES TREASURY Indorsement of Checks § 240.16 Checks issued to minor payees. (a) Checks in payment of principal and/or interest on U.S. securities that are issued to minors may be...

  20. Development of bacterial biofilms in dairy processing lines.

    PubMed

    Austin, J W; Bergeron, G

    1995-08-01

    Adherence of bacteria to various milk contact sites was examined by scanning electron microscopy and transmission electron microscopy. New gaskets, endcaps, vacuum breaker plugs and pipeline inserts were installed in different areas in lines carrying either raw or pasteurized milk, and a routine schedule of cleaning-in-place and sanitizing was followed. Removed cleaned and sanitized gaskets were processed for scanning or transmission electron microscopy. Adherent bacteria were observed on the sides of gaskets removed from both pasteurized and raw milk lines. Some areas of Buna-n gaskets were colonized with a confluent layer of bacterial cells surrounded by an extensive amorphous matrix, while other areas of Buna-n gaskets showed a diffuse adherence over large areas of the surface. Most of the bacteria attached to polytetrafluoroethylene (PTFE or Teflon) gaskets were found in crevices created by insertion of the gasket into the pipeline. Examination of stainless steel endcaps, pipeline inserts, and PTFE vacuum breaker plugs did not reveal the presence of adherent bacteria. The results of this study indicate that biofilms developed on the sides of gaskets in spite of cleaning-in-place procedures. These biofilms may be a source of post-pasteurization contamination.

  1. Using a Changing-Criterion Design to Evaluate the Effects of Check-In/Check-Out with Goal Modification

    ERIC Educational Resources Information Center

    McDaniel, Sara C.; Bruhn, Allison L.

    2016-01-01

    Check-in/check-out (CICO) is a Tier 2 behavioral intervention that has demonstrated effectiveness for students with challenging behavior in a variety of educational settings. Existing research has focused primarily on testing the intervention's effectiveness and the role of behavioral function in moderating response to intervention. Only a handful…

  2. Checking for Ketones

    MedlinePlus

    ... doctor about them as well as record-keeping methods he or she recommends. Most include either packages of strips or foil-wrapped strips (which store longer). Urine tests are simple, but to get good results you have to follow directions carefully. Check ...

  3. Vacuum Energy and Inflation: 4. An Inflationary Universe

    ERIC Educational Resources Information Center

    Huggins, Elisha

    2013-01-01

    This is the fourth paper in a series of four. The first paper in the series, "Vacuum Energy and Inflation: 1. A Liter of Vacuum Energy" [EJ1024183] discusses an example of vacuum energy. Vacuum energy is explained as an energy with a negative pressure whose energy density remains constant in an expanding space. Paper 2, "Vacuum…

  4. Check & Connect: A Comprehensive Student Engagement Intervention Manual

    ERIC Educational Resources Information Center

    Christenson, Sandra L.; Thurlow, Martha L.; Sinclair, Mary F.; Lehr, Camilla A.; Kaibel, Colleen M.; Reschly, Amy L.; Mavis, Ann; Pohl, Angie

    2008-01-01

    Check & Connect was created in a five year period from 1990 to 1995. The original manual, entitled "Keeping Kids in School: Using Check & Connect for Dropout Prevention" and written by David Evelo, Mary Sinclair, Christine Hurley, Sandra Christenson, and Martha Thurlow, was published in 1996 (ED398701). This newly revised Check & Connect manual…

  5. Inkjet 3D printed check microvalve

    NASA Astrophysics Data System (ADS)

    Walczak, Rafał; Adamski, Krzysztof; Lizanets, Danylo

    2017-04-01

    3D printing enables fast and relatively easy fabrication of various microfluidic structures including microvalves. A check microvalve is the simplest valve enabling control of the fluid flow in microchannels. Proper operation of the check valve is ensured by a movable element that tightens the valve seat during backward flow and enables free flow for forward pressure. Thus, knowledge of the mechanical properties of the movable element is crucial for optimal design and operation of the valve. In this paper, we present for the first time the results of investigations on basic mechanical properties of the building material used in multijet 3D printing. Specified mechanical properties were used in the design and fabrication of two types of check microvalve—with deflecting or hinge-fixed microflap—with 200 µm and 300 µm thickness. Results of numerical simulation and experimental data of the microflap deflection were obtained and compared. The valves were successfully 3D printed and characterised. Opening/closing characteristics of the microvalve for forward and backward pressures were determined. Thus, proper operation of the check microvalve so developed was confirmed.

  6. 21 CFR 884.5070 - Vacuum abortion system.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Vacuum abortion system. 884.5070 Section 884.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... § 884.5070 Vacuum abortion system. (a) Identification. A vacuum abortion system is a device designed to...

  7. 46 CFR 153.368 - Pressure-vacuum valves.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Pressure-vacuum valves. 153.368 Section 153.368 Shipping... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Cargo Venting Systems § 153.368 Pressure-vacuum valves. (a) The pressure side of a required pressure-vacuum relief valve...

  8. 46 CFR 153.368 - Pressure-vacuum valves.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Pressure-vacuum valves. 153.368 Section 153.368 Shipping... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Cargo Venting Systems § 153.368 Pressure-vacuum valves. (a) The pressure side of a required pressure-vacuum relief valve...

  9. 46 CFR 153.368 - Pressure-vacuum valves.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Pressure-vacuum valves. 153.368 Section 153.368 Shipping... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Cargo Venting Systems § 153.368 Pressure-vacuum valves. (a) The pressure side of a required pressure-vacuum relief valve...

  10. 46 CFR 153.368 - Pressure-vacuum valves.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Pressure-vacuum valves. 153.368 Section 153.368 Shipping... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Cargo Venting Systems § 153.368 Pressure-vacuum valves. (a) The pressure side of a required pressure-vacuum relief valve...

  11. 46 CFR 153.368 - Pressure-vacuum valves.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Pressure-vacuum valves. 153.368 Section 153.368 Shipping... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Cargo Venting Systems § 153.368 Pressure-vacuum valves. (a) The pressure side of a required pressure-vacuum relief valve...

  12. 21 CFR 884.5070 - Vacuum abortion system.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Vacuum abortion system. 884.5070 Section 884.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... § 884.5070 Vacuum abortion system. (a) Identification. A vacuum abortion system is a device designed to...

  13. 21 CFR 884.5070 - Vacuum abortion system.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Vacuum abortion system. 884.5070 Section 884.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... § 884.5070 Vacuum abortion system. (a) Identification. A vacuum abortion system is a device designed to...

  14. 21 CFR 884.5070 - Vacuum abortion system.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Vacuum abortion system. 884.5070 Section 884.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... § 884.5070 Vacuum abortion system. (a) Identification. A vacuum abortion system is a device designed to...

  15. 21 CFR 884.5070 - Vacuum abortion system.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Vacuum abortion system. 884.5070 Section 884.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... § 884.5070 Vacuum abortion system. (a) Identification. A vacuum abortion system is a device designed to...

  16. The Effects of Check-In/Check-Out on Problem Behavior and Academic Engagement in Elementary School Students

    ERIC Educational Resources Information Center

    Miller, Leila M.; Dufrene, Brad A.; Sterling, Heather E.; Olmi, D. Joe; Bachmayer, Erica

    2015-01-01

    This study evaluated the effectiveness of Check-in/Check-out (CICO) for improving behavioral performance for three students referred for Tier 2 behavioral supports. An ABAB withdrawal design was used to evaluate CICO and results indicate that intervention was effective for reducing problem behavior as well as increasing academic engagement for all…

  17. The localized quantum vacuum field

    NASA Astrophysics Data System (ADS)

    Dragoman, D.

    2008-03-01

    A model for the localized quantum vacuum is proposed in which the zero-point energy (ZPE) of the quantum electromagnetic field originates in energy- and momentum-conserving transitions of material systems from their ground state to an unstable state with negative energy. These transitions are accompanied by emissions and re-absorptions of real photons, which generate a localized quantum vacuum in the neighborhood of material systems. The model could help resolve the cosmological paradox associated with the ZPE of electromagnetic fields, while reclaiming quantum effects associated with quantum vacuum such as the Casimir effect and the Lamb shift. It also offers a new insight into the Zitterbewegung of material particles.

  18. UTP and Temporal Logic Model Checking

    NASA Astrophysics Data System (ADS)

    Anderson, Hugh; Ciobanu, Gabriel; Freitas, Leo

    In this paper we give an additional perspective to the formal verification of programs through temporal logic model checking, which uses Hoare and He Unifying Theories of Programming (UTP). Our perspective emphasizes the use of UTP designs, an alphabetised relational calculus expressed as a pre/post condition pair of relations, to verify state or temporal assertions about programs. The temporal model checking relation is derived from a satisfaction relation between the model and its properties. The contribution of this paper is that it shows a UTP perspective to temporal logic model checking. The approach includes the notion of efficiency found in traditional model checkers, which reduced a state explosion problem through the use of efficient data structures

  19. Coverage Metrics for Model Checking

    NASA Technical Reports Server (NTRS)

    Penix, John; Visser, Willem; Norvig, Peter (Technical Monitor)

    2001-01-01

    When using model checking to verify programs in practice, it is not usually possible to achieve complete coverage of the system. In this position paper we describe ongoing research within the Automated Software Engineering group at NASA Ames on the use of test coverage metrics to measure partial coverage and provide heuristic guidance for program model checking. We are specifically interested in applying and developing coverage metrics for concurrent programs that might be used to support certification of next generation avionics software.

  20. CMM Interim Check Design of Experiments (U)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Montano, Joshua Daniel

    2015-07-29

    Coordinate Measuring Machines (CMM) are widely used in industry, throughout the Nuclear Weapons Complex and at Los Alamos National Laboratory (LANL) to verify part conformance to design definition. Calibration cycles for CMMs at LANL are predominantly one year in length and include a weekly interim check to reduce risk. The CMM interim check makes use of Renishaw’s Machine Checking Gauge which is an off-the-shelf product simulates a large sphere within a CMM’s measurement volume and allows for error estimation. As verification on the interim check process a design of experiments investigation was proposed to test a couple of key factorsmore » (location and inspector). The results from the two-factor factorial experiment proved that location influenced results more than the inspector or interaction.« less

  1. First experiences with the LHC BLM sanity checks

    NASA Astrophysics Data System (ADS)

    Emery, J.; Dehning, B.; Effinger, E.; Nordt, A.; Sapinski, M. G.; Zamantzas, C.

    2010-12-01

    The reliability concerns have driven the design of the Large Hardron Collider (LHC) Beam Loss Monitoring (BLM) system from the early stage of the studies up to the present commissioning and the latest development of diagnostic tools. To protect the system against non-conformities, new ways of automatic checking have been developed and implemented. These checks are regularly and systematically executed by the LHC operation team to ensure that the system status is after each test "as good as new". The sanity checks are part of this strategy. They are testing the electrical part of the detectors (ionisation chamber or secondary emission detector), their cable connections to the front-end electronics, further connections to the back-end electronics and their ability to request a beam abort. During the installation and in the early commissioning phase, these checks have shown their ability to find also non-conformities caused by unexpected failure event scenarios. In every day operation, a non-conformity discovered by this check inhibits any further injections into the LHC until the check confirms the absence of non-conformities.

  2. Vacuum casting of thick polymeric films

    NASA Technical Reports Server (NTRS)

    Cuddihy, E. F.; Moacanin, J.

    1979-01-01

    Bubble formation and layering, which often plague vacuum-evaporated films, are prevented by properly regulating process parameters. Vacuum casting may be applicable to forming thick films of other polymer/solvent solutions.

  3. 14 CFR 25.1433 - Vacuum systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Miscellaneous Equipment § 25.1433 Vacuum systems. There... discharge lines from the vacuum air pump when the delivery temperature of the air becomes unsafe. [Doc. No...

  4. Ceramic vacuum tubes for geothermal well logging

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelly, R.D.

    1977-01-12

    The results of investigations carried out into the availability and suitability of ceramic vacuum tubes for the development of logging tools for geothermal wells are summarized. Design data acquired in the evaluation of ceramic vacuum tubes for the development of a 500/sup 0/C instrumentation amplifier are presented. The general requirements for ceramic vacuum tubes for application to the development of high temperature well logs are discussed. Commercially available tubes are described and future contract activities that specifically relate to ceramic vacuum tubes are detailed. Supplemental data is presented in the appendix. (MHR)

  5. Compressed Air/Vacuum Transportation Techniques

    NASA Astrophysics Data System (ADS)

    Guha, Shyamal

    2011-03-01

    General theory of compressed air/vacuum transportation will be presented. In this transportation, a vehicle (such as an automobile or a rail car) is powered either by compressed air or by air at near vacuum pressure. Four version of such transportation is feasible. In all versions, a ``c-shaped'' plastic or ceramic pipe lies buried a few inches under the ground surface. This pipe carries compressed air or air at near vacuum pressure. In type I transportation, a vehicle draws compressed air (or vacuum) from this buried pipe. Using turbine or reciprocating air cylinder, mechanical power is generated from compressed air (or from vacuum). This mechanical power transferred to the wheels of an automobile (or a rail car) drives the vehicle. In type II-IV transportation techniques, a horizontal force is generated inside the plastic (or ceramic) pipe. A set of vertical and horizontal steel bars is used to transmit this force to the automobile on the road (or to a rail car on rail track). The proposed transportation system has following merits: virtually accident free; highly energy efficient; pollution free and it will not contribute to carbon dioxide emission. Some developmental work on this transportation will be needed before it can be used by the traveling public. The entire transportation system could be computer controlled.

  6. Do alcohol compliance checks decrease underage sales at neighboring establishments?

    PubMed

    Erickson, Darin J; Smolenski, Derek J; Toomey, Traci L; Carlin, Bradley P; Wagenaar, Alexander C

    2013-11-01

    Underage alcohol compliance checks conducted by law enforcement agencies can reduce the likelihood of illegal alcohol sales at checked alcohol establishments, and theory suggests that an alcohol establishment that is checked may warn nearby establishments that compliance checks are being conducted in the area. In this study, we examined whether the effects of compliance checks diffuse to neighboring establishments. We used data from the Complying with the Minimum Drinking Age trial, which included more than 2,000 compliance checks conducted at more than 900 alcohol establishments. The primary outcome was the sale of alcohol to a pseudo-underage buyer without the need for age identification. A multilevel logistic regression was used to model the effect of a compliance check at each establishment as well as the effect of compliance checks at neighboring establishments within 500 m (stratified into four equal-radius concentric rings), after buyer, license, establishment, and community-level variables were controlled for. We observed a decrease in the likelihood of establishments selling alcohol to underage youth after they had been checked by law enforcement, but these effects quickly decayed over time. Establishments that had a close neighbor (within 125 m) checked in the past 90 days were also less likely to sell alcohol to young-appearing buyers. The spatial effect of compliance checks on other establishments decayed rapidly with increasing distance. Results confirm the hypothesis that the effects of police compliance checks do spill over to neighboring establishments. These findings have implications for the development of an optimal schedule of police compliance checks.

  7. Vacuum chamber-free centrifuge with magnetic bearings.

    PubMed

    Park, Cheol Hoon; Kim, Soohyun; Kim, Kyung-Soo

    2013-09-01

    Centrifuges are devices that separate particles of different densities and sizes through the application of a centrifugal force. If a centrifuge could be operated under atmospheric conditions, all vacuum-related components such as the vacuum chamber, vacuum pump, diffusion pump, and sealing could be removed from a conventional centrifuge system. The design and manufacturing procedure for centrifuges could then be greatly simplified to facilitate the production of lightweight centrifuge systems of smaller volume. Furthermore, the maintenance costs incurred owing to wear and tear due to conventional ball bearings would be eliminated. In this study, we describe a novel vacuum chamber-free centrifuge supported by magnetic bearings. We demonstrate the feasibility of the vacuum chamber-free centrifuge by presenting experimental results that verify its high-speed support capability and motoring power capacity.

  8. Vacuum deposition and curing of liquid monomers

    DOEpatents

    Affinito, J.D.

    1993-11-09

    The present invention is the formation of solid polymer layers under vacuum. More specifically, the present invention is the use of standard polymer layer-making equipment that is generally used in an atmospheric environment in a vacuum, and degassing the monomer material prior to injection into the vacuum. Additional layers of polymer or metal may be vacuum deposited onto solid polymer layers. Formation of polymer layers under a vacuum improves material and surface characteristics, and subsequent quality of bonding to additional layers. Further advantages include use of less to no photoinitiator for curing, faster curing, fewer impurities in the polymer electrolyte, as well as improvement in material properties including no trapped gas resulting in greater density, and reduced monomer wetting angle that facilitates spreading of the monomer and provides a smoother finished surface.

  9. Vacuum deposition and curing of liquid monomers

    DOEpatents

    Affinito, J.D.

    1995-03-07

    The present invention is the formation of solid polymer layers under vacuum. More specifically, the present invention is the use of ``standard`` polymer layer-making equipment that is generally used in an atmospheric environment in a vacuum, and degassing the monomer material prior to injection into the vacuum. Additional layers of polymer or metal or oxide may be vacuum deposited onto solid polymer layers. Formation of polymer layers under a vacuum improves material and surface characteristics, and subsequent quality of bonding to additional layers. Further advantages include use of less to no photoinitiator for curing, faster curing, fewer impurities in the polymer electrolyte, as well as improvement in material properties including no trapped gas resulting in greater density, and reduced monomer wetting angle that facilitates spreading of the monomer and provides a smoother finished surface.

  10. Vacuum deposition and curing of liquid monomers

    DOEpatents

    Affinito, John D.

    1993-01-01

    The present invention is the formation of solid polymer layers under vacuum. More specifically, the present invention is the use of "standard" polymer layer-making equipment that is generally used in an atmospheric environment in a vacuum, and degassing the monomer material prior to injection into the vacuum. Additional layers of polymer or metal may be vacuum deposited onto solid polymer layers. Formation of polymer layers under a vacuum improves material and surface characteristics, and subsequent quality of bonding to additional layers. Further advantages include use of less to no photoinitiator for curing, faster curing, fewer impurities in the polymer electrolyte, as well as improvement in material properties including no trapped gas resulting in greater density, and reduced monomer wetting angle that facilitates spreading of the monomer and provides a smoother finished surface.

  11. Vacuum deposition and curing of liquid monomers

    DOEpatents

    Affinito, John D.

    1995-01-01

    The present invention is the formation of solid polymer layers under vacuum. More specifically, the present invention is the use of "standard" polymer layer-making equipment that is generally used in an atmospheric environment in a vacuum, and degassing the monomer material prior to injection into the vacuum. Additional layers of polymer or metal or oxide may be vacuum deposited onto solid polymer layers. Formation of polymer layers under a vacuum improves material and surface characteristics, and subsequent quality of bonding to additional layers. Further advantages include use of less to no photoinitiator for curing, faster curing, fewer impurities in the polymer electrolyte, as well as improvement in material properties including no trapped gas resulting in greater density, and reduced monomer wetting angle that facilitates spreading of the monomer and provides a smoother finished surface.

  12. Cryogenic Insulation System for Soft Vacuum

    NASA Technical Reports Server (NTRS)

    Augustynowicz, S. D.; Fesmire, J. E.

    1999-01-01

    The development of a cryogenic insulation system for operation under soft vacuum is presented in this paper. Conventional insulation materials for cryogenic applications can be divided into three levels of thermal performance, in terms of apparent thermal conductivity [k-value in milliwatt per meter-kelvin (mW/m-K)]. System k-values below 0.1 can be achieved for multilayer insulation operating at a vacuum level below 1 x 10(exp -4) torr. For fiberglass or powder operating below 1 x 10(exp -3) torr, k-values of about 2 are obtained. For foam and other materials at ambient pressure, k-values around 30 are typical. New industry and aerospace applications require a versatile, robust, low-cost thermal insulation with performance in the intermediate range. The target for the new composite insulation system is a k-value below 4.8 mW/m-K (R-30) at a soft vacuum level (from 1 to 10 torr) and boundary temperatures of approximately 77 and 293 kelvin (K). Many combinations of radiation shields, spacers, and composite materials were tested from high vacuum to ambient pressure using cryostat boiloff methods. Significant improvement over conventional systems in the soft vacuum range was demonstrated. The new layered composite insulation system was also shown to provide key benefits for high vacuum applications as well.

  13. Verifying Multi-Agent Systems via Unbounded Model Checking

    NASA Technical Reports Server (NTRS)

    Kacprzak, M.; Lomuscio, A.; Lasica, T.; Penczek, W.; Szreter, M.

    2004-01-01

    We present an approach to the problem of verification of epistemic properties in multi-agent systems by means of symbolic model checking. In particular, it is shown how to extend the technique of unbounded model checking from a purely temporal setting to a temporal-epistemic one. In order to achieve this, we base our discussion on interpreted systems semantics, a popular semantics used in multi-agent systems literature. We give details of the technique and show how it can be applied to the well known train, gate and controller problem. Keywords: model checking, unbounded model checking, multi-agent systems

  14. Vacuum-assisted venous return reduces blood usage.

    PubMed

    Banbury, Michael K; White, Jennifer A; Blackstone, Eugene H; Cosgrove, Delos M

    2003-09-01

    To determine whether vacuum-assisted venous return has clinical advantages over conventional gravity drainage apart from allowing the use of smaller cannulas and shorter tubing. A total of 150 valve operations were performed at our institution between February and July 1999 using vacuum-assisted venous return with small venous cannulas connected to short tubing. These were compared with (1) 83 valve operations performed between April 1997 and January 1998 using the initial version of vacuum-assisted venous return, and (2) 124 valve operations performed between January and April of 1997 using conventional gravity drainage. Priming volume, hematocrit value, red blood cell usage, and total blood product usage were compared multivariably. These comparisons were covariate and propensity adjusted for dissimilarities between the groups and confirmed by propensity-matched pairs analysis. Priming volume was 1.4 +/- 0.4 L for small-cannula vacuum-assisted venous return, 1.7 +/- 0.4 L for initial vacuum-assisted venous return, and 2.0 +/- 0.4 L for gravity drainage (P <.0001). Smaller priming resulted in higher hematocrit values both at the beginning of cardiopulmonary bypass (27% +/- 5% compared with 26% +/- 4% and 25% +/- 4%, respectively, P <.0001) and at the end (30% +/- 4% compared with 28% +/- 4% and 27% +/- 4%, respectively, P <.0001). Red cell transfusions were used in 17% of the patients having small-cannula vacuum-assisted venous return, 27% of the initial patients having vacuum-assisted venous return, and 37% of the patients having gravity drainage (P =.001); total blood product usage was 19%, 27%, and 39%, respectively (P =.002). Although ministernotomy also was associated with reduced blood product usage (P <.004), propensity matching on type of sternotomy confirmed the association of vacuum-assisted venous return with lowered blood product usage. Vacuum-assisted venous return results in (1) higher hematocrit values during cardiopulmonary bypass and (2) decreased

  15. 26 CFR 301.6657-1 - Bad checks.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... money order is less than $500, the penalty shall be $5 or the amount of the check or money order... notice and demand therefor. (b) Reasonable cause. If payment is refused upon presentment of any check or...

  16. 26 CFR 301.6657-1 - Bad checks.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... money order is less than $500, the penalty shall be $5 or the amount of the check or money order... notice and demand therefor. (b) Reasonable cause. If payment is refused upon presentment of any check or...

  17. Symbolic LTL Compilation for Model Checking: Extended Abstract

    NASA Technical Reports Server (NTRS)

    Rozier, Kristin Y.; Vardi, Moshe Y.

    2007-01-01

    In Linear Temporal Logic (LTL) model checking, we check LTL formulas representing desired behaviors against a formal model of the system designed to exhibit these behaviors. To accomplish this task, the LTL formulas must be translated into automata [21]. We focus on LTL compilation by investigating LTL satisfiability checking via a reduction to model checking. Having shown that symbolic LTL compilation algorithms are superior to explicit automata construction algorithms for this task [16], we concentrate here on seeking a better symbolic algorithm.We present experimental data comparing algorithmic variations such as normal forms, encoding methods, and variable ordering and examine their effects on performance metrics including processing time and scalability. Safety critical systems, such as air traffic control, life support systems, hazardous environment controls, and automotive control systems, pervade our daily lives, yet testing and simulation alone cannot adequately verify their reliability [3]. Model checking is a promising approach to formal verification for safety critical systems which involves creating a formal mathematical model of the system and translating desired safety properties into a formal specification for this model. The complement of the specification is then checked against the system model. When the model does not satisfy the specification, model-checking tools accompany this negative answer with a counterexample, which points to an inconsistency between the system and the desired behaviors and aids debugging efforts.

  18. Purifying Aluminum by Vacuum Distillation

    NASA Technical Reports Server (NTRS)

    Du Fresne, E. R.

    1985-01-01

    Proposed method for purifying aluminum employs one-step vacuum distillation. Raw material for process impure aluminum produced in electrolysis of aluminum ore. Impure metal melted in vacuum. Since aluminum has much higher vapor pressure than other constituents, boils off and condenses on nearby cold surfaces in proportions much greater than those of other constituents.

  19. Checking and Balancing: Banking and Budgeting.

    ERIC Educational Resources Information Center

    Thypin, Marilyn; Glasner, Lynne

    A short fictional work for limited English speakers is presented that relates a young couple's experience in learning about managing their money more carefully by budgeting and maintaining a checking account. Since the couple did not have a checking account, they had to go to their savings bank in order to pay each bill and they had to keep cash…

  20. Breakdown-Resistant RF Connectors for Vacuum

    NASA Technical Reports Server (NTRS)

    Caro, Edward R.; Bonazza, Walter J.

    1987-01-01

    Resilient inserts compensate for insulation shrinkage. Coaxial-cable connector for radio-frequency (RF) energy resists electrical breakdown in vacuum. Used on RF equipment in vacuum chambers as well as in spaceborne radar and communication gear.