Sample records for vacuum building inspection

  1. 40 CFR 35.2216 - Notice of building completion and final inspection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 40 Protection of Environment 1 2010-07-01 2010-07-01 false Notice of building completion and final... Notice of building completion and final inspection. The grantee shall notify the Regional Administrator when the building of the project is complete. Final inspection shall be made by the Regional...

  2. Inspection qualification (IQ) and operational qualification (OQ) for a vacuum freeze-dryer--Part I. General discussion.

    PubMed

    Jennings, T A; Scheer, A; Emodi, A; Puderbach, L; King, S; Norton, T

    1996-01-01

    The principle objectives of this paper are (a), to develop the rationale for conducting an inspection qualification (IQ) and operational qualification (OQ) of a vacuum freeze-dryer; (b), to identify the key elements that require verification for completion of the IQ; and (c), to establish the necessary environmental and operational parameters necessary for the OQ of the vacuum freeze-dryer.

  3. Post-earthquake building safety inspection: Lessons from the Canterbury, New Zealand, earthquakes

    USGS Publications Warehouse

    Marshall, J.; Jaiswal, Kishor; Gould, N.; Turner, F.; Lizundia, B.; Barnes, J.

    2013-01-01

    The authors discuss some of the unique aspects and lessons of the New Zealand post-earthquake building safety inspection program that was implemented following the Canterbury earthquake sequence of 2010–2011. The post-event safety assessment program was one of the largest and longest programs undertaken in recent times anywhere in the world. The effort engaged hundreds of engineering professionals throughout the country, and also sought expertise from outside, to perform post-earthquake structural safety inspections of more than 100,000 buildings in the city of Christchurch and the surrounding suburbs. While the building safety inspection procedure implemented was analogous to the ATC 20 program in the United States, many modifications were proposed and implemented in order to assess the large number of buildings that were subjected to strong and variable shaking during a period of two years. This note discusses some of the key aspects of the post-earthquake building safety inspection program and summarizes important lessons that can improve future earthquake response.

  4. School Building Construction and Inspection Resource Manual. Revision 1.

    ERIC Educational Resources Information Center

    Utah State Office of Education, Salt Lake City.

    This manual contains current legal requirements and information on school building construction and inspection in the state of Utah. Major topics include facilities long-range planning; the role and responsibilities of the School District Building Official; school site issues such as size and location, impact, and acquisition and development; as…

  5. Vacuum Spheres Outside of Building 1247 NASA LaRC

    NASA Image and Video Library

    2013-06-07

    The vacuum spheres outside of building 1247 are reflected in a pool of rain water after an unusual break in weather on Friday, which gave a brief moment of sunshine, blue skies and standing water as Tropical Storm Andrea approaches from the south.

  6. 49 CFR 570.56 - Vacuum brake assist unit and vacuum brake system.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    .... The following requirements apply to vehicles with vacuum brake assist units and vacuum brake systems. (a) Vacuum brake assist unit integrity. The vacuum brake assist unit shall demonstrate integrity as... maintained on the pedal. (1) Inspection procedure. Stop the engine and apply service brake several times to...

  7. Oblique Aerial Photography Tool for Building Inspection and Damage Assessment

    NASA Astrophysics Data System (ADS)

    Murtiyoso, A.; Remondino, F.; Rupnik, E.; Nex, F.; Grussenmeyer, P.

    2014-11-01

    Aerial photography has a long history of being employed for mapping purposes due to some of its main advantages, including large area imaging from above and minimization of field work. Since few years multi-camera aerial systems are becoming a practical sensor technology across a growing geospatial market, as complementary to the traditional vertical views. Multi-camera aerial systems capture not only the conventional nadir views, but also tilted images at the same time. In this paper, a particular use of such imagery in the field of building inspection as well as disaster assessment is addressed. The main idea is to inspect a building from four cardinal directions by using monoplotting functionalities. The developed application allows to measure building height and distances and to digitize man-made structures, creating 3D surfaces and building models. The realized GUI is capable of identifying a building from several oblique points of views, as well as calculates the approximate height of buildings, ground distances and basic vectorization. The geometric accuracy of the results remains a function of several parameters, namely image resolution, quality of available parameters (DEM, calibration and orientation values), user expertise and measuring capability.

  8. 13. Building H9; view of stainless steel probes and vacuum ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. Building H-9; view of stainless steel probes and vacuum line, looking W. (Ryan and Harms) - Holston Army Ammunition Plant, RDX-and-Composition-B Manufacturing Line 9, Kingsport, Sullivan County, TN

  9. Environmental site assessments and audits: Building inspection requirements

    NASA Astrophysics Data System (ADS)

    Lange, John H.; Kaiser, Genevieve; Thomulka, Kenneth W.

    1994-01-01

    Environmental site assessment criteria were originally developed by organizations that focused, almost exclusively, on surface, subsurface, and pollution source contamination. Many of the hazards associated with indoor environments and building structures were traditionally not considered when evaluating sources and entities of environmental pollution. Since a large number of building materials are potentially hazardous, careful evaluation is necessary. Until recently, little information on building inspection requirements of environmental problems has been published. Traditionally, asbestos has been the main component of concern. The ever-changing environmental standards have dramatically expanded the scope of building surveys. Indoor environmental concerns, for example, currently include formaldehyde, lead-based paint, polychlorinated biphenyls, radon, and indoor air pollution. Environmental regulations are being expanded and developed that specifically include building structures. These regulatory standards are being triggered by an increased awareness of health effects from indoor exposure, fires, spills, and other accidents that have resulted in injury, death, and financial loss. This article discusses various aspects of assessments for building structures.

  10. 17. General view, 'West End S.P. Inspection Building', view ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    17. General view, 'West End - S.P. Inspection Building', view to east, August 16, 1939. Bridge Yard Interlocking Tower and main line tracks at left, Oil House and storage yard at right. An Interurban Electric Railway car, with power supply pantograph raised, is visible at left of the building, another is just visible inside the building's left (north) bay, and still others are visible in the storage yard at right. - Interurban Electric Railway Bridge Yard Shop, Interstate 80 at Alameda County Postmile 2.0, Oakland, Alameda County, CA

  11. Selection of suitable NDT methods for building inspection

    NASA Astrophysics Data System (ADS)

    Pauzi Ismail, Mohamad

    2017-11-01

    Construction of modern structures requires good quality concrete with adequate strength and durability. Several accidents occurred in the civil constructions and were reported in the media. Such accidents were due to poor workmanship and lack of systematic monitoring during the constructions. In addition, water leaking and cracking in residential houses was commonly reported too. Based on these facts, monitoring the quality of concrete in structures is becoming more and more important subject. This paper describes major Non-destructive Testing (NDT) methods for evaluating structural integrity of concrete building. Some interesting findings during actual NDT inspections on site are presented. The NDT methods used are explained, compared and discussed. The suitable methods are suggested as minimum NDT methods to cover parameters required in the inspection.

  12. Guided-waves technique for inspecting the health of wall-covered building risers

    NASA Astrophysics Data System (ADS)

    Tse, Peter W.; Chen, J. M.; Wan, X.

    2015-03-01

    The inspection technique uses guided ultrasonic waves (GW) has been proven effective in detecting pipes' defects. However, as of today, the technique has not attracted much market attention because of insufficient field tests and lack of traceable records with proven results in commercial applications. In this paper, it presents the results obtained by using GW to inspect the defects occurred in real gas risers that are commonly installed in tall buildings. The purpose of having risers is to deliver gas from any building external piping system to each household unit of the building. The risers extend from the external wall of the building, penetrate thorough the concrete wall, into the kitchen or bathroom of each household unit. Similar to in-service pipes, risers are prone to corrosion due to water leaks into the concrete wall. However, the corrosion occurs in the section of riser, which is covered by the concrete wall, is difficult to be inspected by conventional techniques. Hence, GW technique was employed. The effectiveness of GW technique was tested by laboratory and on-site experiments using real risers gathered from tall buildings. The experimental results show that GW can partially penetrate thorough the riser's section that is covered by wall. The integrity of the wall-covered section of a riser can be determined by the reflected wave signals generated by the corroded area that may exit inside the wall-covered section. Based on the reflected wave signal, one can determine the health of the wall-covered riser.

  13. Condition Assessment of the Timber Structures of a Century-Old Industrial Building Using a Nondestructive Inspection Procedure

    Treesearch

    Xiping Wang; Marko Teder; James Wacker

    2013-01-01

    This paper reports an in situ inspection project conducted on heavy timber structures of a century-old industrial building at a paper manufacturing facility. A nondestructive inspection procedure was employed to evaluate the true condition of the heavy timbers that serve as the main framing structure of the building. The on-site investigation involved monitoring of the...

  14. Parallel optimization algorithm for drone inspection in the building industry

    NASA Astrophysics Data System (ADS)

    Walczyński, Maciej; BoŻejko, Wojciech; Skorupka, Dariusz

    2017-07-01

    In this paper we present an approach for Vehicle Routing Problem with Drones (VRPD) in case of building inspection from the air. In autonomic inspection process there is a need to determine of the optimal route for inspection drone. This is especially important issue because of the very limited flight time of modern multicopters. The method of determining solutions for Traveling Salesman Problem(TSP), described in this paper bases on Parallel Evolutionary Algorithm (ParEA)with cooperative and independent approach for communication between threads. This method described first by Bożejko and Wodecki [1] bases on the observation that if exists some number of elements on certain positions in a number of permutations which are local minima, then those elements will be in the same position in the optimal solution for TSP problem. Numerical experiments were made on BEM computational cluster with using MPI library.

  15. Vacuum Head Checks Foam/Substrate Bonds

    NASA Technical Reports Server (NTRS)

    Lloyd, James F.

    1989-01-01

    Electromechanical inspection system quickly gives measurements indicating adhesion, or lack thereof, between rigid polyurethane foam and aluminum substrate. Does not damage inspected article, easy to operate, and used to perform "go/no-go" evaluations or as supplement to conventional destructive pull-plug testing. Applies vacuum to small area of foam panel and measures distance through which foam pulled into vacuum. Probe head applied to specimen and evacuated through hose to controller/monitor unit. Digital voltmeter in unit reads deflection of LVDT probe head.

  16. Processing ultrasonic inspection data from multiple scan patterns for turbine rotor weld build-up evaluations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Guan, Xuefei; Zhou, S. Kevin; Rasselkorde, El Mahjoub

    The study presents a data processing methodology for weld build-up using multiple scan patterns. To achieve an overall high probability of detection for flaws with different orientations, an inspection procedure with three different scan patterns is proposed. The three scan patterns are radial-tangential longitude wave pattern, axial-radial longitude wave pattern, and tangential shear wave pattern. Scientific fusion of the inspection data is implemented using volume reconstruction techniques. The idea is to perform spatial domain forward data mapping for all sampling points. A conservative scheme is employed to handle the case that multiple sampling points are mapped to one grid location.more » The scheme assigns the maximum value for the grid location to retain the largest equivalent reflector size for the location. The methodology is demonstrated and validated using a realistic ring of weld build-up. Tungsten balls and bars are embedded to the weld build-up during manufacturing process to represent natural flaws. Flat bottomed holes and side drilled holes are installed as artificial flaws. Automatic flaw identification and extraction are demonstrated. Results indicate the inspection procedure with multiple scan patterns can identify all the artificial and natural flaws.« less

  17. Processing ultrasonic inspection data from multiple scan patterns for turbine rotor weld build-up evaluations

    NASA Astrophysics Data System (ADS)

    Guan, Xuefei; Rasselkorde, El Mahjoub; Abbasi, Waheed; Zhou, S. Kevin

    2015-03-01

    The study presents a data processing methodology for weld build-up using multiple scan patterns. To achieve an overall high probability of detection for flaws with different orientations, an inspection procedure with three different scan patterns is proposed. The three scan patterns are radial-tangential longitude wave pattern, axial-radial longitude wave pattern, and tangential shear wave pattern. Scientific fusion of the inspection data is implemented using volume reconstruction techniques. The idea is to perform spatial domain forward data mapping for all sampling points. A conservative scheme is employed to handle the case that multiple sampling points are mapped to one grid location. The scheme assigns the maximum value for the grid location to retain the largest equivalent reflector size for the location. The methodology is demonstrated and validated using a realistic ring of weld build-up. Tungsten balls and bars are embedded to the weld build-up during manufacturing process to represent natural flaws. Flat bottomed holes and side drilled holes are installed as artificial flaws. Automatic flaw identification and extraction are demonstrated. Results indicate the inspection procedure with multiple scan patterns can identify all the artificial and natural flaws.

  18. How to Build a Vacuum Spring-transport Package for Spinning Rotor Gauges

    PubMed Central

    Fedchak, James A.; Scherschligt, Julia; Sefa, Makfir

    2016-01-01

    The spinning rotor gauge (SRG) is a high-vacuum gauge often used as a secondary or transfer standard for vacuum pressures in the range of 1.0 x 10-4 Pa to 1.0 Pa. In this application, the SRGs are frequently transported to laboratories for calibration. Events can occur during transportation that change the rotor surface conditions, thus changing the calibration factor. To assure calibration stability, a spring-transport mechanism is often used to immobilize the rotor and keep it under vacuum during transport. It is also important to transport the spring-transport mechanism using packaging designed to minimize the risk of damage during shipping. In this manuscript, a detailed description is given on how to build a robust spring-transport mechanism and shipping container. Together these form a spring-transport package. The spring-transport package design was tested using drop-tests and the performance was found to be excellent. The present spring-transport mechanism design keeps the rotor immobilized when experiencing shocks of several hundred g (g = 9.8 m/sec2 and is the acceleration due to gravity), while the shipping container assures that the mechanism will not experience shocks greater than about 100 g during common shipping mishaps (as defined by industry standards). PMID:27078575

  19. Energy Savings Modeling and Inspection Guidelines for Commercial Building Federal Tax Deductions for Buildings in 2016 and Later

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Deru, Michael; Field-Macumber, Kristin

    This document provides guidance for modeling and inspecting energy-efficient property in commercial buildings for certification of the energy and power cost savings related to Section 179D of the Internal Revenue Code (IRC) enacted in Section 1331 of the 2005 Energy Policy Act (EPAct) of 2005, noted in Internal Revenue Service (IRS) Notices 2006-52 (IRS 2006), 2008-40 (IRS 2008) and 2012-26 (IRS 2012), and updated by the Protecting Americans from Tax Hikes (PATH) Act of 2015. Specifically, Section 179D provides federal tax deductions for energy-efficient property related to a commercial building's envelope; interior lighting; heating, ventilating, and air conditioning (HVAC); andmore » service hot water (SHW) systems. This document applies to buildings placed in service on or after January 1, 2016.« less

  20. Technical specification for vacuum systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Khaw, J.

    The vacuum systems at the Stanford Linear Accelerator Center (SLAC) are primarily of all-metal construction and operate at pressures from 10/sup -5/ to 10/sup -11/ Torr. The primary gas loads during operation result from thermal desorption and beam-induced desorption from the vacuum chamber walls. These desorption rates can be extremely high in the case of hydrocarbons and other contaminants. These specifications place a major emphasis on eliminating contamination sources. The specifications and procedures have been written to insure the cleanliness and vacuum integrity of all SLAC vacuum systems, and to assist personnel involved with SLAC vacuum systems in choosing andmore » designing components that are compatible with existing systems and meet the quality and reliability of SLAC vacuum standards. The specification includes requirements on design, procurement, fabrication, chemical cleaning, clean room practices, welding and brazing, helium leak testing, residual gas analyzer testing, bakeout, venting, and pumpdown. Also appended are specifications regarding acceptable vendors, isopropyl alcohol, bakeable valve cleaning procedure, mechanical engineering safety inspection, notes on synchrotron radiation, and specifications of numerous individual components. (LEW)« less

  1. Device for inspecting vessel surfaces

    DOEpatents

    Appel, D. Keith

    1995-01-01

    A portable, remotely-controlled inspection crawler for use along the walls of tanks, vessels, piping and the like. The crawler can be configured to use a vacuum chamber for supporting itself on the inspected surface by suction or a plurality of magnetic wheels for moving the crawler along the inspected surface. The crawler is adapted to be equipped with an ultrasonic probe for mapping the structural integrity or other characteristics of the surface being inspected. Navigation of the crawler is achieved by triangulation techniques between a signal transmitter on the crawler and a pair of microphones attached to a fixed, remote location, such as the crawler's deployment unit. The necessary communications are established between the crawler and computers external to the inspection environment for position control and storage and/or monitoring of data acquisition.

  2. From the Paper to the Tablet: On the Design of an AR-Based Tool for the Inspection of Pre-Fab Buildings. Preliminary Results of the SIRAE Project

    PubMed Central

    Fernández, Marcos; Poza, Montse

    2018-01-01

    Energy-efficient Buildings (EeB) are demanded in today’s constructions, fulfilling the requirements for green cities. Pre-fab buildings, which are modularly fully-built in factories, are a good example of this. Although this kind of building is quite new, the in situ inspection is documented using traditional tools, mainly based on paper annotations. Thus, the inspection process is not taking advantage of new technologies. In this paper, we present the preliminary results of the SIRAE project that aims to provide an Augmented Reality (AR) tool that can seamlessly aid in the regular processes of pre-fab building inspections to detect and eliminate the possible existing quality and energy efficiency deviations. In this regards, we show a description of the current inspection process and how an interactive tool can be designed and adapted to it. Our first results show the design and implementation of our tool, which is highly interactive and involves AR visualizations and 3D data-gathering, allowing the inspectors to quickly manage it without altering the way the inspection process is done. First trials on a real environment show that the tool is promising for massive inspection processes. PMID:29671799

  3. From the Paper to the Tablet: On the Design of an AR-Based Tool for the Inspection of Pre-Fab Buildings. Preliminary Results of the SIRAE Project.

    PubMed

    Portalés, Cristina; Casas, Sergio; Gimeno, Jesús; Fernández, Marcos; Poza, Montse

    2018-04-19

    Energy-efficient Buildings (EeB) are demanded in today’s constructions, fulfilling the requirements for green cities. Pre-fab buildings, which are modularly fully-built in factories, are a good example of this. Although this kind of building is quite new, the in situ inspection is documented using traditional tools, mainly based on paper annotations. Thus, the inspection process is not taking advantage of new technologies. In this paper, we present the preliminary results of the SIRAE project that aims to provide an Augmented Reality (AR) tool that can seamlessly aid in the regular processes of pre-fab building inspections to detect and eliminate the possible existing quality and energy efficiency deviations. In this regards, we show a description of the current inspection process and how an interactive tool can be designed and adapted to it. Our first results show the design and implementation of our tool, which is highly interactive and involves AR visualizations and 3D data-gathering, allowing the inspectors to quickly manage it without altering the way the inspection process is done. First trials on a real environment show that the tool is promising for massive inspection processes.

  4. To develop a flying fish egg inspection system by a digital imaging base system

    NASA Astrophysics Data System (ADS)

    Chen, Chun-Jen; Jywe, Wenyuh; Hsieh, Tung-Hsien; Chen, Chien Hung

    2015-07-01

    This paper develops an automatic optical inspection system for flying fish egg quality inspection. The automatic optical inspection system consists of a 2-axes stage, a digital camera, a lens, a LED light source, a vacuum generator, a tube and a tray. This system can automatically find the particle on the flying egg tray and used stage to driver the tube onto the particle. Then use straw and vacuum generator to pick up the particle. The system pick rate is about 30 particles per minute.

  5. Device for inspecting vessel surfaces

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Appel, D.K.

    1995-12-12

    A portable, remotely-controlled inspection crawler is described for use along the walls of tanks, vessels, piping and the like. The crawler can be configured to use a vacuum chamber for supporting itself on the inspected surface by suction or a plurality of magnetic wheels for moving the crawler along the inspected surface. The crawler is adapted to be equipped with an ultrasonic probe for mapping the structural integrity or other characteristics of the surface being inspected. Navigation of the crawler is achieved by triangulation techniques between a signal transmitter on the crawler and a pair of microphones attached to amore » fixed, remote location, such as the crawler`s deployment unit. The necessary communications are established between the crawler and computers external to the inspection environment for position control and storage and/or monitoring of data acquisition. 5 figs.« less

  6. Vacuum decay container/closure integrity testing technology. Part 2. Comparison to dye ingress tests.

    PubMed

    Wolf, Heinz; Stauffer, Tony; Chen, Shu-Chen Y; Lee, Yoojin; Forster, Ronald; Ludzinski, Miron; Kamat, Madhav; Mulhall, Brian; Guazzo, Dana Morton

    2009-01-01

    Part 1 of this series demonstrated that a container closure integrity test performed according to ASTM F2338-09 Standard Test Method for Nondestructive Detection of Leaks in Packages by Vacuum Decay Method using a VeriPac 325/LV vacuum decay leak tester by Packaging Technologies & Inspection, LLC (PTI) is capable of detecting leaks > or = 5.0 microm (nominal diameter) in rigid, nonporous package systems, such as prefilled glass syringes. The current study compared USP, Ph.Eur. and ISO dye ingress integrity test methods to PTI's vacuum decay technology for the detection of these same 5-, 10-, and 15-microm laser-drilled hole defects in 1-mL glass prefilled syringes. The study was performed at three test sites using several inspectors and a variety of inspection conditions. No standard dye ingress method was found to reliably identify all holed syringes. Modifications to these standard dye tests' challenge conditions increased the potential for dye ingress, and adjustments to the visual inspection environment improved dye ingress detection. However, the risk of false positive test results with dye ingress tests remained. In contrast, the nondestructive vacuum decay leak test method reliably identified syringes with holes > or = 5.0 microm.

  7. Laser Shearography Inspection of TPS (Thermal Protection System) Cork on RSRM (Reusable Solid Rocket Motors)

    NASA Technical Reports Server (NTRS)

    Lingbloom, Mike; Plaia, Jim; Newman, John

    2006-01-01

    Laser Shearography is a viable inspection method for detection of de-bonds and voids within the external TPS (thermal protection system) on to the Space Shuttle RSRM (reusable solid rocket motors). Cork samples with thicknesses up to 1 inch were tested at the LTI (Laser Technology Incorporated) laboratory using vacuum-applied stress in a vacuum chamber. The testing proved that the technology could detect cork to steel un-bonds using vacuum stress techniques in the laboratory environment. The next logical step was to inspect the TPS on a RSRM. Although detailed post flight inspection has confirmed that ATK Thiokol's cork bonding technique provides a reliable cork to case bond, due to the Space Shuttle Columbia incident there is a great interest in verifying bond-lines on the external TPS. This interest provided and opportunity to inspect a RSRM motor with Laser Shearography. This paper will describe the laboratory testing and RSRM testing that has been performed to date. Descriptions of the test equipment setup and techniques for data collection and detailed results will be given. The data from the test show that Laser Shearography is an effective technology and readily adaptable to inspect a RSRM.

  8. Eco-sewerage System Design for Modern Office Buildings: based on Vacuum and Source-separation Technology

    NASA Astrophysics Data System (ADS)

    Xu, Kangning; Wang, Chengwen; Zheng, Min; Yuan, Xin

    2010-11-01

    This study aimed to construct an on-site eco-sewerage system for modern office buildings in urban area based on combined innovative technologies of vacuum and source-separation. Results showed that source-separated grey water had low concentrations of pollutants, which helped the reuse of grey water. However, the system had a low separation efficiency between the yellow water and the brown water, which was caused by the plug problem in the urine collection from the urine-diverting toilets. During the storage of yellow water for liquid fertilizer production, nearly all urea nitrogen transferred to ammonium nitrogen and about 2/3 phosphorus was lost because of the struvite precipitation. Total bacteria and coliforms increased first in the storage, but then decreased to low concentrations. The anaerobic/anoxic/aerobic MBR had high elimination rates of COD, ammonium nitrogen and total nitrogen of the brown water, which were 94.2%, 98.1% and 95.1%, respectively. However, the effluent still had high contents of colority, nitrate and phosphorus, which affected the application of the effluent for flushing water. Even though, the effluent might be used as dilution water for the yellow water fertilizer. Based on the results and the assumption of an ideal operation of the vacuum source-separation system, a future plan for on-site eco-sewerage system of modern office buildings was constructed. Its sustainability was validated by the analysis of the substances flow of water and nutrients.

  9. 36 CFR 702.9 - Inspection of property.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Section 702.9 Parks, Forests, and Public Property LIBRARY OF CONGRESS CONDUCT ON LIBRARY PREMISES § 702.9 Inspection of property. (a) Individuals entering Library buildings do so with the understanding that all..., packages, and office equipment may be inspected. (b) Upon entering the Library buildings privately owned...

  10. 36 CFR 702.9 - Inspection of property.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Section 702.9 Parks, Forests, and Public Property LIBRARY OF CONGRESS CONDUCT ON LIBRARY PREMISES § 702.9 Inspection of property. (a) Individuals entering Library buildings do so with the understanding that all..., packages, and office equipment may be inspected. (b) Upon entering the Library buildings privately owned...

  11. 36 CFR 702.9 - Inspection of property.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Section 702.9 Parks, Forests, and Public Property LIBRARY OF CONGRESS CONDUCT ON LIBRARY PREMISES § 702.9 Inspection of property. (a) Individuals entering Library buildings do so with the understanding that all..., packages, and office equipment may be inspected. (b) Upon entering the Library buildings privately owned...

  12. 36 CFR 702.9 - Inspection of property.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Section 702.9 Parks, Forests, and Public Property LIBRARY OF CONGRESS CONDUCT ON LIBRARY PREMISES § 702.9 Inspection of property. (a) Individuals entering Library buildings do so with the understanding that all..., packages, and office equipment may be inspected. (b) Upon entering the Library buildings privately owned...

  13. Vacuum Chamber Documentation for U of H Collection

    NASA Image and Video Library

    2006-06-16

    Documentation for the University of Houston (UH) Clear Lake collection of their library books after the Vacuum Chamber runs were performed to remove the water from them. Vacuum Chamber B in Building 32 was used.

  14. Comparisons of NDT Methods to Inspect Cork and Cork filled Epoxy Bands

    NASA Technical Reports Server (NTRS)

    Lingbloom, Mike

    2007-01-01

    Sheet cork and cork filled epoxy provide external insulation for the Reusable Solid Rocket Motor (RSRM) on the Nation's Space Transportation System (STS). Interest in the reliability of the external insulation bonds has increased since the Columbia incident. A non-destructive test (NDT) method that will provide the best inspection for these bonds has been under evaluation. Electronic Shearography has been selected as the primary NDT method for inspection of these bond lines in the RSRM production flow. ATK Launch Systems Group has purchased an electronic shearography system that includes a vacuum chamber that is used for evaluation of test parts and custom vacuum windows for inspection of full-scale motors. Although the electronic shearography technology has been selected as the primary method for inspection of the external bonds, other technologies that exist continue to be investigated. The NASA/Marshall Space Flight Center (MSFC) NDT department has inspected several samples for comparison with electronic shearography with various inspections systems in their laboratory. The systems that were evaluated are X-ray backscatter, terahertz imaging, and microwave imaging. The samples tested have some programmed flaws as well as some flaws that occurred naturally during the sample making process. These samples provide sufficient flaw variation for the evaluation of the different inspection systems. This paper will describe and compare the basic functionality, test method and test results including dissection for each inspection technology.

  15. Fire Prevention Inspection Procedures.

    ERIC Educational Resources Information Center

    Pribyl, Paul F.

    Lesson plans are provided for a fire prevention inspection course of the Wisconsin Fire Service Training program. Objectives for the course are to enable students to describe and conduct fire prevention inspections, to identify and correct hazards common to most occupancies, to understand the types of building construction and occupancy, and to…

  16. Possibilities of Use of UAVS for Technical Inspection of Buildings and Constructions

    NASA Astrophysics Data System (ADS)

    Banaszek, Anna; Banaszek, Sebastian; Cellmer, Anna

    2017-12-01

    In recent years, Unmanned Aerial Vehicles (UAVs) have been used in various sectors of the economy. This is due to the development of new technologies for acquiring and processing geospatial data. The paper presents the results of experiments using UAV, equipped with a high resolution digital camera, for a visual assessment of the technical condition of the building roof and for the inventory of energy infrastructure and its surroundings. The usefulness of digital images obtained from the UAV deck is presented in concrete examples. The use of UAV offers new opportunities in the area of technical inspection due to the detail and accuracy of the data, low operating costs and fast data acquisition.

  17. 36 CFR § 702.9 - Inspection of property.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ....9 Section § 702.9 Parks, Forests, and Public Property LIBRARY OF CONGRESS CONDUCT ON LIBRARY PREMISES § 702.9 Inspection of property. (a) Individuals entering Library buildings do so with the... envelopes, packages, and office equipment may be inspected. (b) Upon entering the Library buildings...

  18. 15 CFR 716.4 - Scope and conduct of inspections.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... of whether the Inspection Team's request to inspect any area, building, item or record is reasonable... Inspection Team: (i) Will receive a pre-inspection briefing from facility representatives; (ii) Will visually..., he or she is consenting to provide access to the Inspection Team and Host Team to any area of the...

  19. 15 CFR 716.4 - Scope and conduct of inspections.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... of whether the Inspection Team's request to inspect any area, building, item or record is reasonable... Inspection Team: (i) Will receive a pre-inspection briefing from facility representatives; (ii) Will visually..., he or she is consenting to provide access to the Inspection Team and Host Team to any area of the...

  20. 15 CFR 716.4 - Scope and conduct of inspections.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... of whether the Inspection Team's request to inspect any area, building, item or record is reasonable... Inspection Team: (i) Will receive a pre-inspection briefing from facility representatives; (ii) Will visually..., he or she is consenting to provide access to the Inspection Team and Host Team to any area of the...

  1. 15 CFR 716.4 - Scope and conduct of inspections.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... of whether the Inspection Team's request to inspect any area, building, item or record is reasonable... Inspection Team: (i) Will receive a pre-inspection briefing from facility representatives; (ii) Will visually..., he or she is consenting to provide access to the Inspection Team and Host Team to any area of the...

  2. Fire Inspection Guide for Schools.

    ERIC Educational Resources Information Center

    Virginia State Corp. Commission, Richmond.

    A functional explanation of the "School Fire Prevention Inspection Form" is provided for use by local school and fire department personnel in the Virginia School Fire Prevention Inspection Program. Many helpful suggestions are made for safeguarding occupants of public school buildings from fire hazards. Items discussed are--(1) exit doors, (2)…

  3. Upgrade of The Thermal Vacuum Data System at NASA/GSFC

    NASA Technical Reports Server (NTRS)

    Palmer, John; Powers, Edward I. (Technical Monitor)

    2000-01-01

    The Goddard Space Flight Center's new thermal vacuum data acquisition system is a networked client-sever application that enables lab operations crews to monitor all tests from a central location. The GSFC thermal vacuum lab consists of eleven chambers in Building 7 and one chamber in Building 10. The new data system was implemented for several reasons. These included the need for centralized data collection, more flexible and easier to use operator interface, greater data accessibility, a reduction in testing time and cost, and increased payload and personnel safety. Additionally, a new data system was needed for year-2000 compliance. This paper discusses the incorporation of the Thermal Vacuum Data System (TVDS) within the thermal vacuum lab at GSFC, its features and capabilities and lessons learned in its implementation. Additional topics include off-center (Internet) capability for remote monitoring and the role of TVDS in the efforts to automate thermal vacuum chamber operations.

  4. Upgrade of the Thermal Vacuum Data System at NASA/GSFC

    NASA Technical Reports Server (NTRS)

    Palmer, John

    2000-01-01

    The Goddard Space Flight Center's new thermal vacuum data acquisition system is a networked client-sever application that enables lab operations crews to monitor all tests from a central location. The GSFC thermal vacuum lab consists of eleven chambers in Building 7 and one chamber in Building 10. The new data system was implemented for several reasons. These included the need for centralized data collection, more flexible and easier to use operator interface, greater data accessibility, a reduction in testing time and cost, and increased payload and personnel safety. Additionally, a new data system was needed for year-2000 compliance. This paper discusses the incorporation of the Thermal Vacuum Data System (TVDS) within the thermal vacuum lab at GSFC, its features and capabilities and lessons learned in its implementation. Additional topics include off-center (Internet) capability for remote monitoring and the role of TVDS in the efforts to automate thermal vacuum chamber operations.

  5. Evaluation of supercapacitors for space applications under thermal vacuum conditions

    NASA Astrophysics Data System (ADS)

    Chin, Keith C.; Green, Nelson W.; Brandon, Erik J.

    2018-03-01

    Commercially available supercapacitor cells from three separate vendors were evaluated for use in a space environment using thermal vacuum (Tvac) testing. Standard commercial cells are not hermetically sealed, but feature crimp or double seam seals between the header and the can, which may not maintain an adequate seal under vacuum. Cells were placed in a small vacuum chamber, and cycled between three separate temperature set points. Charging and discharging of cells was executed following each temperature soak, to confirm there was no significant impact on performance. A final electrical performance check, visual inspection and mass check following testing were also performed, to confirm the integrity of the cells had not been compromised during exposure to thermal cycling under vacuum. All cells tested were found to survive this testing protocol and exhibited no significant impact on electrical performance.

  6. Machine vision systems using machine learning for industrial product inspection

    NASA Astrophysics Data System (ADS)

    Lu, Yi; Chen, Tie Q.; Chen, Jie; Zhang, Jian; Tisler, Anthony

    2002-02-01

    Machine vision inspection requires efficient processing time and accurate results. In this paper, we present a machine vision inspection architecture, SMV (Smart Machine Vision). SMV decomposes a machine vision inspection problem into two stages, Learning Inspection Features (LIF), and On-Line Inspection (OLI). The LIF is designed to learn visual inspection features from design data and/or from inspection products. During the OLI stage, the inspection system uses the knowledge learnt by the LIF component to inspect the visual features of products. In this paper we will present two machine vision inspection systems developed under the SMV architecture for two different types of products, Printed Circuit Board (PCB) and Vacuum Florescent Displaying (VFD) boards. In the VFD board inspection system, the LIF component learns inspection features from a VFD board and its displaying patterns. In the PCB board inspection system, the LIF learns the inspection features from the CAD file of a PCB board. In both systems, the LIF component also incorporates interactive learning to make the inspection system more powerful and efficient. The VFD system has been deployed successfully in three different manufacturing companies and the PCB inspection system is the process of being deployed in a manufacturing plant.

  7. In-vessel visible inspection system on KSTAR

    NASA Astrophysics Data System (ADS)

    Chung, Jinil; Seo, D. C.

    2008-08-01

    To monitor the global formation of the initial plasma and damage to the internal structures of the vacuum vessel, an in-vessel visible inspection system has been installed and operated on the Korean superconducting tokamak advanced research (KSTAR) device. It consists of four inspection illuminators and two visible/H-alpha TV cameras. Each illuminator uses four 150W metal-halide lamps with separate lamp controllers, and programmable progressive scan charge-coupled device cameras with 1004×1004 resolution at 48frames/s and a resolution of 640×480 at 210frames/s are used to capture images. In order to provide vessel inspection capability under any operation condition, the lamps and cameras are fully controlled from the main control room and protected by shutters from deposits during plasma operation. In this paper, we describe the design and operation results of the visible inspection system with the images of the KSTAR Ohmic discharges during the first plasma campaign.

  8. Hazard Analysis for Building 34 Vacuum Glove Box Assembly

    NASA Technical Reports Server (NTRS)

    Meginnis, Ian

    2014-01-01

    One of the characteristics of an effective safety program is the recognition and control of hazards before mishaps or failures occur. Conducting potentially hazardous tests necessitates a thorough hazard analysis in order to prevent injury to personnel, and to prevent damage to facilities and equipment. The primary purpose of this hazard analysis is to define and address the potential hazards and controls associated with the Building 34 Vacuum Glove Box Assembly, and to provide the applicable team of personnel with the documented results. It is imperative that each member of the team be familiar with the hazards and controls associated with his/her particular tasks, assignments and activities while interfacing with facility test systems, equipment and hardware. In fulfillment of the stated purposes, the goal of this hazard analysis is to identify all hazards that have the potential to harm personnel, damage the facility or its test systems or equipment, test articles, Government or personal property, or the environment. This analysis may also assess the significance and risk, when applicable, of lost test objectives when substantial monetary value is involved. The hazards, causes, controls, verifications, and risk assessment codes have been documented on the hazard analysis work sheets in Appendix A of this document. The preparation and development of this report is in accordance with JPR 1700.1, "JSC Safety and Health Handbook" and JSC 17773 Rev D "Instructions for Preparation of Hazard Analysis for JSC Ground Operations".

  9. Pre-Demolition Inspections

    EPA Pesticide Factsheets

    A pre-demolition inspection may be one of the most helpful and cost-efficient steps you can take to identify materials that should (or must) be removed from buildings prior to demolition. In some cases it may be required by regulation.

  10. Masonry building envelope analysis

    NASA Astrophysics Data System (ADS)

    McMullan, Phillip C.

    1993-04-01

    Over the past five years, infrared thermography has proven an effective tool to assist in required inspections on new masonry construction. However, with more thermographers providing this inspection service, establishing a standard for conducting these inspections is imperative. To attempt to standardize these inspections, it is important to understand the nature of the inspection as well as the context in which the inspection is typically conducted. The inspection focuses on evaluating masonry construction for compliance with the design specifications with regard to structural components and thermal performance of the building envelope. The thermal performance of the building includes both the thermal resistance of the material as well as infiltration/exfiltration characteristics. Given that the inspections occur in the 'field' rather than the controlled environment of a laboratory, there are numerous variables to be considered when undertaking this type of inspection. Both weather and site conditions at the time of the inspection can vary greatly. In this paper we will look at the variables encountered during recent inspections. Additionally, the author will present the standard which was employed in collecting this field data. This method is being incorporated into a new standard to be included in the revised version of 'Guidelines for Specifying and Performing Infrared Inspections' developed by the Infraspection Institute.

  11. 13. VIEW OF VACUUM CHAMBER AND WELDING EQUIPMENT IN MODULE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    13. VIEW OF VACUUM CHAMBER AND WELDING EQUIPMENT IN MODULE E. PARTS WERE WELDED UNDER A VACUUM TO PREVENT CORROSION. (11/6/73) - Rocky Flats Plant, Plutonium Manufacturing Facility, North-central section of Plant, just south of Building 776/777, Golden, Jefferson County, CO

  12. Investigations Of A Pulsed Cathodic Vacuum Arc

    NASA Astrophysics Data System (ADS)

    Oates, T. W. H.; Pigott, J.; Denniss, P.; Mckenzie, D. R.; Bilek, M. M. M.

    2003-06-01

    Cathodic vacuum arcs are well established as a method for producing thin films for coatings and as a source of metal ions. Research into DC vacuum arcs has been going on for over ten years in the School of Physics at the University of Sydney. Recently a project was undertaken in the school to design and build a pulsed CVA for use in the investigation of plasma sheaths and plasma immersion ion implantation. Pulsed cathodic vacuum arcs generally have a higher current and plasma density and also provide a more stable and reproducible plasma density than their DC counterparts. Additionally it has been shown that if a high repetition frequency can be established the deposition rate of pulsed arcs is equal to or greater than that of DC arcs with a concomitant reduction in the rate of macro-particle formation. We present here results of our investigations into the building of a center-triggered pulsed cathodic vacuum arc. The design of the power supply and trigger mechanism and the geometry of the anode and cathode are examined. Observations of type I and II arc spots using a CCD camera, and cathode spot velocity dependence on arc current will be presented. The role of retrograde motion in a high current pulsed arc is discussed.

  13. Main Vacuum Technical Issues of Evacuated Tube Transportation

    NASA Astrophysics Data System (ADS)

    Zhang, Y. P.; Li, S. S.; Wang, M. X.

    In the future, Evacuated Tube Transportation (ETT) would be built and faster than jets. ETT tube with diameter 2∼4m and length over 1000 km will be the largest scale vacuum equipment on earth. This paper listed some main vacuum technical issues to be solved in ETT as follow. How to build ultra-large-scale vacuum chamber like ETT tube with low cost and high reliability? How to pump gas out off the ETT tube in short time? How to release heat or reduce temperature in the vacuum tube? Hot to avoid vacuum electricity discharge? How to manufacture vehicles with airproof shells and equip the life support system? How to detect leakage and find leakage position efficiently and fast as possible? Some relative solutions and suggestions are put up.

  14. 14. VIEW OF VACUUM COATING CHAMBER. THE SYSTEM USED TITANIUM ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    14. VIEW OF VACUUM COATING CHAMBER. THE SYSTEM USED TITANIUM VAPORS TO DEPOSIT TITANIUM COATING ONTO URANIUM PARTS UNDER A VACUUM. (1/11/83) - Rocky Flats Plant, Non-Nuclear Production Facility, South of Cottonwood Avenue, west of Seventh Avenue & east of Building 460, Golden, Jefferson County, CO

  15. A review of vacuum insulation research and development in the Building Materials Group of the Oak Ridge National Laboratory

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kollie, T.G.; McElroy, D.L.; Fine, H.A.

    This report is a summary of the development work on flat-vacuum insulation performed by the Building Materials Group (BMG) in the Metals and Ceramics Division of the Oak Ridge National Laboratory (ORNL) during the last two years. A historical review of the technology of vacuum insulation is presented, and the role that ORNL played in this development is documented. The ORNL work in vacuum insulation has been concentrated in Powder-filled Evacuated Panels (PEPs) that have a thermal resistivity over 2.5 times that of insulating foams and seven times that of many batt-type insulations, such as fiberglass. Experimental results of substitutingmore » PEPs for chlorofluorocarbon (CFC) foal insulation in Igloo Corporation ice coolers are summarized. This work demonstrated that one-dimensional (1D) heat flow models overestimated the increase in thermal insulation of a foam/PEP-composite insulation, but three-dimensional (3D) models provided by a finite-difference, heat-transfer code (HEATING-7) accurately predicted the resistance of the composites. Edges and corners of the ice coolers were shown to cause the errors in the 1D models as well as shunting of the heat through the foam and around the PEPs. The area of coverage of a PEP in a foam/PEP composite is established as an important parameter in maximizing the resistance of such composites. 50 refs., 27 figs,. 22 tabs.« less

  16. SLAC All Access: Vacuum Microwave Device Department

    ScienceCinema

    Haase, Andy

    2018-05-11

    The Vacuum Microwave Device Department (VMDD) builds the devices that make SLAC's particle accelerators go. These devices, called klystrons, generate intense waves of microwave energy that rocket subatomic particles up to nearly the speed of light.

  17. SLAC All Access: Vacuum Microwave Device Department

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Haase, Andy

    2012-10-09

    The Vacuum Microwave Device Department (VMDD) builds the devices that make SLAC's particle accelerators go. These devices, called klystrons, generate intense waves of microwave energy that rocket subatomic particles up to nearly the speed of light.

  18. Inspection qualification (IQ) and operational qualification (OQ) for a vacuum freeze-dryer--Part II: Inspection qualification.

    PubMed

    Jennings, T A; Scheer, A; Emodi, A; Puderbach, L; King, S; Norton, T

    1996-01-01

    This paper demonstrates the importance of the inspection qualification (IQ). It was shown that the facilities were adequate to house the dryer and its associated instrumentation, and that the facilities had sufficient utilities to operate the dryer. The IQ established that the design and construction of the dryer was in agreement with the proposed hardware and design specifications. It was verified that the dryer was constructed in accordance with specifications set-forth by the equipment manufacturer.

  19. Cosmic R-string, R-tube and vacuum instability

    NASA Astrophysics Data System (ADS)

    Eto, Minoru; Hamada, Yuta; Kamada, Kohei; Kobayashi, Tatsuo; Ohashi, Keisuke; Ookouchi, Yutaka

    2013-03-01

    We show that a cosmic string associated with spontaneous U(1) R symmetry breaking gives a constraint for supersymmetric model building. In some models, the string can be viewed as a tube-like domain wall with a winding number interpolating a false vacuum and a true vacuum. Such string causes inhomogeneous decay of the false vacuum to the true vacuum via rapid expansion of the radius of the tube and hence its formation would be inconsistent with the present Universe. However, we demonstrate that there exist metastable solutions which do not expand rapidly. Furthermore, when the true vacua are degenerate, the structure inside the tube becomes involved. As an example, we show a "bamboo"-like solution, which suggests a possibility observing an information of true vacua from outside of the tube through the shape and the tension of the tube.

  20. 6. Vacuum purification room and upper level offices Bureau ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    6. Vacuum purification room and upper level offices - Bureau of Mines Boulder City Experimental Station, Titanium Research Building, Date Street north of U.S. Highway 93, Boulder City, Clark County, NV

  1. 9 CFR 354.220 - Buildings.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Buildings. 354.220 Section 354.220... CERTIFICATION VOLUNTARY INSPECTION OF RABBITS AND EDIBLE PRODUCTS THEREOF Buildings and Plant Facilities § 354.220 Buildings. The buildings shall be of sound construction and kept in good repair, and shall be of...

  2. Field documentation and client presentation of IR inspections on new masonry structures

    NASA Astrophysics Data System (ADS)

    McMullan, Phillip C.

    1991-03-01

    With the adoption of American Concrete Institute's Design Standard 530 (ACI 530-88/ASCE 5-88) and Specifications (ACI 530.1-88/ASCE 6-88) by more governing bodies throughout the United States, the level and method of inspecting masonry structures is rapidly changing. These new standards set forth inspection criteria such that the Professional of Record (i.e., Architect), can determine the level of inspection based on the type and complexity of the structure being built. For example, a hospital would require considerably more inspection than a Seven-Eleven mini-market. However, the standards require that all new masonry buildings must be inspected. Infrared thermography has proven to be an effective tool to assist in the required inspections. These inspections focus on evaluating masonry for compliance with the design specifications with regard to material, structural strength and thermal performance, the use of video infrared thermography provides a thorough systematic method for inspection of structural solids and thermal integrity of masonry structures. In conducting masonry inspections, the creation of a permanent, well-documented record is valuable in avoiding potential controversy over the inspection findings. Therefore, the inspection method, verification of findings, and presentation of the inspection data are key to the successful use of infrared thermography as an inspection tool. This paper will focus on the method of inspection which TSI employs in conducting new masonry inspections. Additionally, an important component of any work is the presentation of the data. We will look at the information which is generated during this type of inspection and how that data can be converted into a usable report for the various parties involved in construction of a new masonry building.

  3. System-Inspection Guidelines for Minnesota PK-12 School Construction Projects.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Children, Families, and Learning, St. Paul.

    This document describes a 1998 commissioning statute passed by the Minnesota legislature requiring that mechanical HVAC systems undergo an inspection process to uncover and rectify problems before or shortly after a school building is occupied. The document presents the statute, describes the commissioning/system-inspection process and optional…

  4. ULTRA HIGH VACUUM VALVE

    DOEpatents

    Fry, W.A.

    1962-05-29

    A valve for high vacuum applications such as the CStellarator where chamber pressures as low as 2 x 10/sup -10/ mm Hg are necessary is designed with a line-of-sight path through the valve for visual inspection of the contents of reactants in such chambers. The valve comprises a turnable resilient metal ball having an aperture therethrough, means for selectively turning the ball to rotate the axis of its line-of-sight path, and soft, deformable opposing orifices that are movable relatively toward said ball to seal with opposite ball surfaces upon said movement of said axis of said line-of-sight path. The valve also includes a bellows seal connected between said orifices and internal actuating means that eliminates the requirement for gasketed turnable valve closing stems. (AEC)

  5. Photocopy of drawing (original drawing of Armament & Instrument Inspection ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (original drawing of Armament & Instrument Inspection and Adjustment Bldg. in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1941 architectural drawings by Construction Division, Office of the Quartermaster General) FIRST FLOOR PLAN, SECTIONS, AND DETAILS - MacDill Air Force Base, Armament & Instrument Inspection & Adjustment Building, 7807 Hanger Loop Drive, Tampa, Hillsborough County, FL

  6. Photocopy of drawing (original drawing of Armament & Instrument Inspection ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (original drawing of Armament & Instrument Inspection and Adjustment Bldg. in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1941 architectural drawings by Construction Division, Office of the Quartermaster General) ELEVATIONS AND DETAILS - MacDill Air Force Base, Armament & Instrument Inspection & Adjustment Building, 7807 Hanger Loop Drive, Tampa, Hillsborough County, FL

  7. Photocopy of drawing (original drawing of Armament & Instrument Inspection ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Photocopy of drawing (original drawing of Armament & Instrument Inspection and Adjustment Bldg. in possession of MacDill Air Force Base, Civil Engineering, Tampa, Florida; 1941 architectural drawings by Construction Division, Office of the Quartermaster General) ELEVATIONS AND SECTIONS - MacDill Air Force Base, Armament & Instrument Inspection & Adjustment Building, 7807 Hanger Loop Drive, Tampa, Hillsborough County, FL

  8. TPS Inspection and Repair

    NASA Technical Reports Server (NTRS)

    Parazynski, Scott

    2012-01-01

    Dr. Scott Parazynski provided a retrospective on the EVA tools and procedures efforts NASA went through in the aftermath of Columbia for the Shuttle Thermal Protection System (TPS) inspection and repair. He describes his role as the lead astronaut on this effort, and covered all of the Neutral Buoyancy Lab (NBL), KC 135 (reduced gravity aircraft), Precision Air Bearing Floor (PABF), vacuum chamber and 1 G testing that was done in order to develop the tools and techniques that were flown. Parazynski also discusses how the EVA community worked together to resolve a huge safety issue, and how his work in the spacesuit was critical to overcoming a design limitation of the Space Shuttle.

  9. Infrared On-Orbit Inspection of Shuttle Orbiter Reinforced Carbon-Carbon Using Solar Heating

    NASA Technical Reports Server (NTRS)

    Howell, P. A.; Winfree, W. P.; Cramer, K. Elliott

    2005-01-01

    Thermographic nondestructive inspection techniques have been shown to provide quantitative, large area damage detection capabilities for the ground inspection of the reinforced carbon-carbon (RCC) used for the wing leading edge of the Shuttle orbiter. The method is non-contacting and able to inspect large areas in a relatively short inspection time. Thermal nondestructive evaluation (NDE) inspections have been shown to be applicable for several applications to the Shuttle in preparation for return to flight, including for inspection of RCC panels during impact testing, and for between-flight orbiter inspections. The focus of this work is to expand the capabilities of the thermal NDE methodology to enable inspection by an astronaut during orbital conditions. The significant limitations of available resources, such as weight and power, and the impact of these limitations on the inspection technique are discussed, as well as the resultant impact on data analysis and processing algorithms. Of particular interest is the impact to the inspection technique resulting from the use of solar energy as a heat source, the effect on the measurements due to working in the vacuum of space, and the effect of changes in boundary conditions, such as radiation losses seen by the material, on the response of the RCC. The resultant effects on detectability limits are discussed. Keywords: Nondestructive Evaluation, Shuttle, on-orbit inspection, thermography, infrared

  10. Vacuum force

    NASA Astrophysics Data System (ADS)

    Han, Yongquan

    2015-03-01

    To study on vacuum force, we must clear what is vacuum, vacuum is a space do not have any air and also ray. There is not exist an absolute the vacuum of space. The vacuum of space is relative, so that the vacuum force is relative. There is a certain that vacuum vacuum space exists. In fact, the vacuum space is relative, if the two spaces compared to the existence of relative vacuum, there must exist a vacuum force, and the direction of the vacuum force point to the vacuum region. Any object rotates and radiates. Rotate bend radiate- centripetal, gravity produced, relative gravity; non gravity is the vacuum force. Gravity is centripetal, is a trend that the objects who attracted wants to Centripetal, or have been do Centripetal movement. Any object moves, so gravity makes the object curve movement, that is to say, the radiation range curve movement must be in the gravitational objects, gravity must be existed in non vacuum region, and make the object who is in the region of do curve movement (for example: The earth moves around the sun), or final attracted in the form gravitational objects, and keep relatively static with attract object. (for example: objects on the earth moves but can't reach the first cosmic speed).

  11. SAFER Under Vehicle Inspection Through Video Mosaic Building

    DTIC Science & Technology

    2004-01-01

    this work were taken using a Polaris Wp-300c Lipstick video camera mounted on a mobile platform. Infrared video was taken using a Raytheon PalmIR PRO...Tank- Automotive Research, Development and Engineering Center, US Army RDECOM, Warren, Michigan, USA. Keywords Inspection, Road vehicles, State...security, Robotics Abstract The current threats to US security, both military and civilian, have led to an increased interest in the development of

  12. 12. VIEW OF THE INSPECTION MODULE (MODULE D). THE GLOVE ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    12. VIEW OF THE INSPECTION MODULE (MODULE D). THE GLOVE BOX IN THE FOREFRONT OF THE PHOTOGRAPH CONTAINS A DRILL PRESS; OTHER GLOVE BOXES ARE USED FOR PARTS INSPECTION. (5/70) - Rocky Flats Plant, Plutonium Manufacturing Facility, North-central section of Plant, just south of Building 776/777, Golden, Jefferson County, CO

  13. VIEW OF THE PRODUCTION FLOOR OF BUILDING 460. BUILDING 460 ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    VIEW OF THE PRODUCTION FLOOR OF BUILDING 460. BUILDING 460 WAS CONSTRUCTED FOR THE MANUFACTURE OF STAINLESS STEEL COMPONENTS SUCH AS RESERVOIRS, TUBES, AND NON-FISSILE TRIGGER COMPONENTS. MANUFACTURING, TESTING, AND INSPECTION PROCESSES OCCUPIED MOST OF THE GROUND FLOOR. (2/20/96) - Rocky Flats Plant, Stainless Steel & Non-Nuclear Components Manufacturing, Southeast corner of intersection of Cottonwood & Third Avenues, Golden, Jefferson County, CO

  14. Automated inspection of bread and loaves

    NASA Astrophysics Data System (ADS)

    Batchelor, Bruce G.

    1993-08-01

    The prospects for building practical automated inspection machines, capable of detecting the following faults in ordinary, everyday loaves are reviewed: (1) foreign bodies, using X-rays, (2) texture changes, using glancing illumination, mathematical morphology and Neural Net learning techniques, and (3) shape deformations, using structured lighting and simple geometry.

  15. Research on construction settlement of different soft foundation under vacuum preloading condition

    NASA Astrophysics Data System (ADS)

    Bin, LI; Changquan, YIN

    2017-11-01

    Vacuum preloading, rigid foundation, raft foundation and piled raft foundation are more commonly used in soft foundation treatment. PLAXIS is large finite element software of rock and soil, which can simulate the influence of different foundation forms. After the vacuum preloading treatment, the foundation settlement is reduced by 80%, the raft foundation settlement is reduced by 60%, the pile raft foundation settlement is reduced by 40%. It is suggested that the vacuum preloading is used to deal with the foundation of the building. If the time limit, the pile raft foundation is used as the foundation form of the foundation is better than others.

  16. In-Space Inspection Technologies Vision

    NASA Technical Reports Server (NTRS)

    Studor, George

    2012-01-01

    Purpose: Assess In-Space NDE technologies and needs - current & future spacecraft. Discover & build on needs, R&D & NDE products in other industries and agencies. Stimulate partnerships in & outside NASA to move technologies forward cooperatively. Facilitate group discussion on challenges and opportunities of mutual benefit. Focus Areas: Miniaturized 3D Penetrating Imagers Controllable Snake-arm Inspection systems Miniature Free-flying Micro-satellite Inspectors

  17. Pipe inspection using the pipe crawler. Innovative technology summary report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    1999-05-01

    The US Department of Energy (DOE) continually seeks safer and more cost-effective remediation technologies for use in the decontamination and decommissioning (D and D) of nuclear facilities. In several of the buildings at the Fernald Site, there is piping that was used to transport process materials. As the demolition of these buildings occur, disposal of this piping has become a costly issue. Currently, all process piping is cut into ten-foot or less sections, the ends of the piping are wrapped and taped to prevent the release of any potential contaminants into the air, and the piping is placed in rollmore » off boxes for eventual repackaging and shipment to the Nevada Test Site (NTS) for disposal. Alternatives that allow for the onsite disposal of process piping are greatly desired due to the potential for dramatic savings in current offsite disposal costs. No means is currently employed to allow for the adequate inspection of the interior of piping, and consequently, process piping has been assumed to be internally contaminated and thus routinely disposed of at NTS. The BTX-II system incorporates a high-resolution micro color camera with lightheads, cabling, a monitor, and a video recorder. The complete probe is capable of inspecting pipes with an internal diameter (ID) as small as 1.4 inches. By using readily interchangeable lightheads, the same system is capable of inspecting piping up to 24 inches in ID. The original development of the BTX system was for inspection of boiler tubes and small diameter pipes for build-up, pitting, and corrosion. However, the system is well suited for inspecting the interior of most types of piping and other small, confined areas. The report describes the technology, its performance, uses, cost, regulatory and policy issues, and lessons learned.« less

  18. Indian Vacuum Society: The Indian Vacuum Society

    NASA Astrophysics Data System (ADS)

    Saha, T. K.

    2008-03-01

    The Indian Vacuum Society (IVS) was established in 1970. It has over 800 members including many from Industry and R & D Institutions spread throughout India. The society has an active chapter at Kolkata. The society was formed with the main aim to promote, encourage and develop the growth of Vacuum Science, Techniques and Applications in India. In order to achieve this aim it has conducted a number of short term courses at graduate and technician levels on vacuum science and technology on topics ranging from low vacuum to ultrahigh vacuum So far it has conducted 39 such courses at different parts of the country and imparted training to more than 1200 persons in the field. Some of these courses were in-plant training courses conducted on the premises of the establishment and designed to take care of the special needs of the establishment. IVS also regularly conducts national and international seminars and symposia on vacuum science and technology with special emphasis on some theme related to applications of vacuum. A large number of delegates from all over India take part in the deliberations of such seminars and symposia and present their work. IVS also arranges technical visits to different industries and research institutes. The society also helped in the UNESCO sponsored post-graduate level courses in vacuum science, technology and applications conducted by Mumbai University. The society has also designed a certificate and diploma course for graduate level students studying vacuum science and technology and has submitted a syllabus to the academic council of the University of Mumbai for their approval, we hope that some colleges affiliated to the university will start this course from the coming academic year. IVS extended its support in standardizing many of the vacuum instruments and played a vital role in helping to set up a Regional Testing Centre along with BARC. As part of the development of vacuum education, the society arranges the participation of

  19. Label inspection of approximate cylinder based on adverse cylinder panorama

    NASA Astrophysics Data System (ADS)

    Lin, Jianping; Liao, Qingmin; He, Bei; Shi, Chenbo

    2013-12-01

    This paper presents a machine vision system for automated label inspection, with the goal to reduce labor cost and ensure consistent product quality. Firstly, the images captured from each single-camera are distorted, since the inspection object is approximate cylindrical. Therefore, this paper proposes an algorithm based on adverse cylinder projection, where label images are rectified by distortion compensation. Secondly, to overcome the limited field of viewing for each single-camera, our method novelly combines images of all single-cameras and build a panorama for label inspection. Thirdly, considering the shake of production lines and error of electronic signal, we design the real-time image registration to calculate offsets between the template and inspected images. Experimental results demonstrate that our system is accurate, real-time and can be applied for numerous real- time inspections of approximate cylinders.

  20. Study of a risk-based piping inspection guideline system.

    PubMed

    Tien, Shiaw-Wen; Hwang, Wen-Tsung; Tsai, Chih-Hung

    2007-02-01

    A risk-based inspection system and a piping inspection guideline model were developed in this study. The research procedure consists of two parts--the building of a risk-based inspection model for piping and the construction of a risk-based piping inspection guideline model. Field visits at the plant were conducted to develop the risk-based inspection and strategic analysis system. A knowledge-based model had been built in accordance with international standards and local government regulations, and the rational unified process was applied for reducing the discrepancy in the development of the models. The models had been designed to analyze damage factors, damage models, and potential damage positions of piping in the petrochemical plants. The purpose of this study was to provide inspection-related personnel with the optimal planning tools for piping inspections, hence, to enable effective predictions of potential piping risks and to enhance the better degree of safety in plant operations that the petrochemical industries can be expected to achieve. A risk analysis was conducted on the piping system of a petrochemical plant. The outcome indicated that most of the risks resulted from a small number of pipelines.

  1. 15 CFR 270.320 - Entry and inspection of site where a building failure has occurred.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... deploys a Team, the Team members will be issued notices of inspection authority to enter and inspect the...

  2. 15 CFR 270.320 - Entry and inspection of site where a building failure has occurred.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... deploys a Team, the Team members will be issued notices of inspection authority to enter and inspect the...

  3. 15 CFR 270.320 - Entry and inspection of site where a building failure has occurred.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... deploys a Team, the Team members will be issued notices of inspection authority to enter and inspect the...

  4. 15 CFR 270.320 - Entry and inspection of site where a building failure has occurred.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... deploys a Team, the Team members will be issued notices of inspection authority to enter and inspect the...

  5. 15 CFR 270.320 - Entry and inspection of site where a building failure has occurred.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... deploys a Team, the Team members will be issued notices of inspection authority to enter and inspect the...

  6. 78 FR 8448 - Streamlining Inspection and Warranty Requirements for Federal Housing Administration (FHA) Single...

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-02-06

    ... jurisdiction did not already perform its own inspections for new construction, and issue building permits and... expected to be minimal. The increased quality of construction materials and the standardization of building... governments that have adopted building codes to regulate and standardize the construction of residential and...

  7. 18. Interior view, 'Inside Key Route Inspection Bldg.', view to ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    18. Interior view, 'Inside Key Route Inspection Bldg.', view to east, August 16, 1939. Note inspection pits and work areas beneath tracks. The Key Route and Interurban Electric Railway Bridge Yard Shop buildings were identical, and this view provides an in-service look at the well-lit interior. While Key Route articulated cars were quite different in design from the Interurban Electric Railway cars, the maintenance requirements were quite similar. The Key Route Bridge Yard Shop building was demolished in the 1970s. Its last use was storage of much of the historic railway equipment now on display at the California State Railroad Museum in Sacramento. - Interurban Electric Railway Bridge Yard Shop, Interstate 80 at Alameda County Postmile 2.0, Oakland, Alameda County, CA

  8. A cargo inspection system based on pulsed fast neutron analysis (PFNA).

    PubMed

    Ipe, N E; Olsher, R; Ryge, P; Mrozack, J; Thieu, J

    2005-01-01

    A cargo inspection system based on pulsed fast neutron analysis (PFNA) is to be used at a border crossing to detect explosives and contraband hidden in trucks and cargo containers. Neutrons are produced by the interaction of deuterons in a deuterium target mounted on a moveable scan arm. The collimated pulsed fast neutron beam is used to determine the location and composition of objects in a cargo container. The neutrons produce secondary gamma rays that are characteristic of the object's elemental composition. The cargo inspection system building consists of an accelerator room and an inspection tunnel. The accelerator room is shielded and houses the injector, accelerator and the neutron production gas target. The inspection tunnel is partially shielded. The truck or container to be inspected will be moved through the inspection tunnel by a conveyor system. The facility and radiation source terms considered in the shielding design are described.

  9. Evaluation of Vacuum Blasting and Heat Guns as Methods for Abating Lead- Based Paint on Buildings

    DTIC Science & Technology

    1993-09-01

    INCOMPATIBILITY - Contact with powerful oxidizing agents such as FLUORINE, CHLORINE TRIFLUORIDE , MANGANESE TRIOXIDE, OXYGEN DIFLUORIDE, MANGANESE...investigating new technologies for lead-based paint abatement. This research evaluates the effectiveness , safety, LEC1L•.T• and cost of vacuum abrasive...paint abatement. This research evaluates the effectiveness , safety, and cost of vacuum abrasive units and heat guns as methods of removing lead-based

  10. Energy in buildings: Efficiency, renewables and storage

    NASA Astrophysics Data System (ADS)

    Koebel, Matthias M.

    2017-07-01

    This lecture summary provides a short but comprehensive overview on the "energy and buildings" topic. Buildings account for roughly 40% of the global energy demands. Thus, an increased adoption of existing and upcoming materials and solutions for the building sector represents an enormous potential to reduce building related energy demands and greenhouse gas emissions. The central question is how the building envelope (insulation, fenestration, construction style, solar control) affects building energy demands. Compared to conventional insulation materials, superinsulation materials such as vacuum insulation panels and silica aerogel achieve the same thermal performance with significantly thinner insulation layers. With low-emissivity coatings and appropriate filler gasses, double and triple glazing reduce thermal losses by up to an order of magnitude compared to old single pane windows, while vacuum insulation and aerogel filled glazing could reduce these even further. Electrochromic and other switchable glazing solutions maximize solar gains during wintertime and minimize illumination demands whilst avoiding overheating in summer. Upon integration of renewable energy systems into the building energy supply, buildings can become both producers and consumers of energy. Combined with dynamic user behavior, temporal variations in the production of renewable energy require appropriate storage solutions, both thermal and electrical, and the integration of buildings into smart grids and energy district networks. The combination of these measures allows a reduction of the existing building stock by roughly a factor of three —a promising, but cost intensive way, to prepare our buildings for the energy turnaround.

  11. 24 CFR 901.30 - Indicator #5, annual inspection of units and systems.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... the Environmental Protection Agency; (C) Natural disasters; and (D) Units kept vacant because they... buildings and sites according to the PHA's maintenance plan, including performing the required maintenance... weight of x1. (1) Grade A: The PHA inspected all major systems at 100% of its buildings and sites...

  12. Vacuum mechatronics

    NASA Technical Reports Server (NTRS)

    Hackwood, Susan; Belinski, Steven E.; Beni, Gerardo

    1989-01-01

    The discipline of vacuum mechatronics is defined as the design and development of vacuum-compatible computer-controlled mechanisms for manipulating, sensing and testing in a vacuum environment. The importance of vacuum mechatronics is growing with an increased application of vacuum in space studies and in manufacturing for material processing, medicine, microelectronics, emission studies, lyophylisation, freeze drying and packaging. The quickly developing field of vacuum mechatronics will also be the driving force for the realization of an advanced era of totally enclosed clean manufacturing cells. High technology manufacturing has increasingly demanding requirements for precision manipulation, in situ process monitoring and contamination-free environments. To remove the contamination problems associated with human workers, the tendency in many manufacturing processes is to move towards total automation. This will become a requirement in the near future for e.g., microelectronics manufacturing. Automation in ultra-clean manufacturing environments is evolving into the concept of self-contained and fully enclosed manufacturing. A Self Contained Automated Robotic Factory (SCARF) is being developed as a flexible research facility for totally enclosed manufacturing. The construction and successful operation of a SCARF will provide a novel, flexible, self-contained, clean, vacuum manufacturing environment. SCARF also requires very high reliability and intelligent control. The trends in vacuum mechatronics and some of the key research issues are reviewed.

  13. Thermographic Inspections And The Residential Conservation Service Program (RCS)

    NASA Astrophysics Data System (ADS)

    Ward, Ronald J.

    1983-03-01

    Rhode Islanders Saving Energy (RISE) is a non-profit corporation founded in 1977 to provide Rhode Island residents with a variety of energy conservation services. Since January of 1981, it has been performing energy audits in compliance with the Department of Energy's (DOE) Residential Conservation Service Program (RCS). One aspect of the RCS program is the performance of inspections on energy conservation activities completed according to RCS installation guidelines. This paper will describe both the use and results of thermographic inspections within the RISE program. The primary objective of these inspections has been to assure the quality of the building envelope after completion of retrofit measures. Thermal anamolies have been detected that vary in size, location and probable cause. Approximately 37% of all jobs performed through RISE in conjunction with the RCS program have required remedial work as a result of problems that were identi-fied during the thermographic inspection. This percentage was much higher when infra-red inspections were conducted on "Non-RCS" retrofits. Statistics will be presented that provide an interesting insight on the quality of retrofit work when performed in associa-tion with a constant inspection process.

  14. Natural vacuum electronics

    NASA Technical Reports Server (NTRS)

    Leggett, Nickolaus

    1990-01-01

    The ambient natural vacuum of space is proposed as a basis for electron valves. Each valve is an electron controlling structure similiar to a vacuum tube that is operated without a vacuum sustaining envelope. The natural vacuum electron valves discussed offer a viable substitute for solid state devices. The natural vacuum valve is highly resistant to ionizing radiation, system generated electromagnetic pulse, current transients, and direct exposure to space conditions.

  15. 7 CFR 51.56 - Buildings and structures.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... its distribution throughout the plant and washing machinery; (c) There shall also be an efficient... STANDARDS) Regulations 1 Requirements for Plants Operating Under Continuous Inspection on A Contract Basis § 51.56 Buildings and structures. The packing plant buildings shall be properly constructed and...

  16. VACUUM TRAP

    DOEpatents

    Gordon, H.S.

    1959-09-15

    An improved adsorption vacuum trap for use in vacuum systems was designed. The distinguishing feature is the placement of a plurality of torsionally deformed metallic fins within a vacuum jacket extending from the walls to the central axis so that substantially all gas molecules pass through the jacket will impinge upon the fin surfaces. T fins are heated by direct metallic conduction, thereby ol taining a uniform temperature at the adeorbing surfaces so that essentially all of the condensible impurities from the evacuating gas are removed from the vacuum system.

  17. Electronic Out-fall Inspection Application - 12007

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weymouth, A Kent III; Pham, Minh; Messick, Chuck

    2012-07-01

    In early 2009 an exciting opportunity was presented to the Geographic Information Systems (GIS) team at the Savannah River Site (SRS). The SRS maintenance group was directed to maintain all Out-falls on Site, increasing their workload from 75 to 183 out-falls with no additional resources. The existing out-fall inspection system consisted of inspections performed manually and documented via paper trail. The inspections were closed out upon completion of activities and placed in file cabinets with no central location for tracking/trending maintenance activities. A platform for meeting new improvements required for documentation by the Department of Health and Environmental Control (DHEC)more » out-fall permits was needed to replace this current system that had been in place since the 1980's. This was accomplished by building a geographically aware electronic application that improved reliability of site out-fall maintenance and ensured consistent standards were maintained for environmental excellence and worker efficiency. Inspections are now performed via tablet and uploaded to a central point. Work orders are completed and closed either in the field using tablets (mobile application) or in their offices (via web portal) using PCs. And finally completed work orders are now stored in a central database allowing trending of maintenance activities. (authors)« less

  18. Contamination source review for Building E3613, Edgewood Area, Aberdeen Proving Ground, Maryland

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Billmark, K.A.; Emken, M.E.; Muir-Ploense, K.L.

    1995-09-01

    This report was prepared by Argonne National Laboratory (ANL) to document the results of a contamination source review of Building E3613 at the Aberdeen Proving Ground (APG) in Maryland. The report may be used to assist the U.S. Army in planning for the future use or disposition of this building, The review included a historical records search, physical inspection, photographic documentation, geophysical investigation, and collection of air samples. The field investigations were performed by ANL during 1994 and 1995. Building E3613 (APG designation) is located in the Canal Creek Area of APG. The building was constructed in 1954 for usemore » as a change house, office, and storage building in support of the white phosphorus smoke program. The building has not been used since 1988. During an inspection in 1988, asbestos was listed as the only potential contaminant. The physical inspection and photographic documentation of Building E3613 were completed in November 1994. At the time of the inspection, Building E3613 was inactive and in disrepair. The single-story, rectangular structure contains five rooms and measures 16 ft 2 in. by 32 ft. The building is wood frame construction with a gabled roof. The exterior walls and roof are constructed of wood covered with asphalt sheeting. The building rests on a concrete foundation. The interior walls are 6-in.-thick wood, and the ceiling is assumed to be white drywall nailed to a wooden frame. Overhead steam pipes supported by vertical pipes traverse the area. Two concrete footings for guy wires that support the overhead steam pipes are located north and west of the building. Four additional vertical pipes exit the ground east of the building.« less

  19. Implementation of EPICS based vacuum control system for variable energy cyclotron centre, Kolkata

    NASA Astrophysics Data System (ADS)

    Roy, Anindya; Bhole, R. B.; Nandy, Partha P.; Yadav, R. C.; Pal, Sarbajit; Roy, Amitava

    2015-03-01

    The vacuum system of the Room Temperature (K = 130) Cyclotron of Variable Energy Cyclotron Centre is comprised of vacuum systems of main machine and Beam Transport System. The vacuum control system is upgraded to a PLC based Automated system from the initial relay based Manual system. The supervisory control of the vacuum system is implemented in Experimental Physics and Industrial Control System (EPICS). An EPICS embedded ARM based vacuum gauge controller is developed to mitigate the requirement of vendor specific gauge controller for gauges and also for seamless integration of the gauge controllers with the control system. A set of MS-Windows ActiveX components with embedded EPICS Channel Access interface are developed to build operator interfaces with less complex programming and to incorporate typical Windows feature, e.g., user authentication, file handling, better fonts, colors, mouse actions etc. into the operator interfaces. The control parameters, monitoring parameters, and system interlocks of the system are archived in MySQL based EPICS MySQL Archiver developed indigenously. In this paper, we describe the architecture, the implementation details, and the performance of the system.

  20. Implementation of EPICS based vacuum control system for variable energy cyclotron centre, Kolkata.

    PubMed

    Roy, Anindya; Bhole, R B; Nandy, Partha P; Yadav, R C; Pal, Sarbajit; Roy, Amitava

    2015-03-01

    The vacuum system of the Room Temperature (K = 130) Cyclotron of Variable Energy Cyclotron Centre is comprised of vacuum systems of main machine and Beam Transport System. The vacuum control system is upgraded to a PLC based Automated system from the initial relay based Manual system. The supervisory control of the vacuum system is implemented in Experimental Physics and Industrial Control System (EPICS). An EPICS embedded ARM based vacuum gauge controller is developed to mitigate the requirement of vendor specific gauge controller for gauges and also for seamless integration of the gauge controllers with the control system. A set of MS-Windows ActiveX components with embedded EPICS Channel Access interface are developed to build operator interfaces with less complex programming and to incorporate typical Windows feature, e.g., user authentication, file handling, better fonts, colors, mouse actions etc. into the operator interfaces. The control parameters, monitoring parameters, and system interlocks of the system are archived in MySQL based EPICS MySQL Archiver developed indigenously. In this paper, we describe the architecture, the implementation details, and the performance of the system.

  1. Vacuum-assisted fluid flow in microchannels to pattern substrates and cells.

    PubMed

    Shrirao, Anil B; Kung, Frank H; Yip, Derek; Cho, Cheul H; Townes-Anderson, Ellen

    2014-09-01

    Substrate and cell patterning are widely used techniques in cell biology to study cell-to-cell and cell-substrate interactions. Conventional patterning techniques work well only with simple shapes, small areas and selected bio-materials. This paper describes a method to distribute cell suspensions as well as substrate solutions into complex, long, closed (dead-end) polydimethylsiloxane (PDMS) microchannels using negative pressure. Our method builds upon a previous vacuum-assisted method used for micromolding (Jeon et al 1999 Adv. Mater 11 946) and successfully patterned collagen-I, fibronectin and Sal-1 substrates on glass and polystyrene surfaces, filling microchannels with lengths up to 120 mm and covering areas up to 13 × 10 mm(2). Vacuum-patterned substrates were subsequently used to culture mammalian PC12 and fibroblast cells and amphibian neurons. Cells were also patterned directly by injecting cell suspensions into microchannels using vacuum. Fibroblast and neuronal cells patterned using vacuum showed normal growth and minimal cell death indicating no adverse effects of vacuum on cells. Our method fills reversibly sealed PDMS microchannels. This enables the user to remove the PDMS microchannel cast and access the patterned biomaterial or cells for further experimental purposes. Overall, this is a straightforward technique that has broad applicability for cell biology.

  2. Vacuum-assisted Fluid Flow in Microchannels to Pattern Substrates and Cells

    PubMed Central

    Shrirao, Anil B.; Kung, Frank H.; Yip, Derek; Cho, Cheul H.; Townes-Anderson, Ellen

    2014-01-01

    Substrate and cell patterning are widely used techniques in cell biology to study cell-to-cell and cell-to-substrate interactions. Conventional patterning techniques work well only with simple shapes, small areas and selected bio-materials. This paper describes a method to distribute cell suspensions as well as substrate solutions into complex, long, closed (dead-end) polydimethylsiloxane (PDMS) microchannels using negative pressure. Our method builds upon a previous vacuum-assisted method used for micromolding (Jeon, Choi et al. 1999) and successfully patterned collagen-I, fibronectin and Sal-1 substrates on glass and polystyrene surfaces, filling microchannels with lengths up to 120 mm and covering areas up to 13 × 10 mm2. Vacuum-patterned substrates were subsequently used to culture mammalian PC12 and fibroblast cells and amphibian neurons. Cells were also patterned directly by injecting cell suspensions into microchannels using vacuum. Fibroblast and neuronal cells patterned using vacuum showed normal growth and minimal cell death indicating no adverse effects of vacuum on cells. Our method fills reversibly sealed PDMS microchannels. This enables the user to remove the PDMS microchannel cast and access the patterned biomaterial or cells for further experimental purposes. Overall, this is a straightforward technique that has broad applicability for cell biology. PMID:24989641

  3. Comparison of vacuum and non-vacuum urine tubes for urinary sediment analysis.

    PubMed

    Topcuoglu, Canan; Sezer, Sevilay; Kosem, Arzu; Ercan, Mujgan; Turhan, Turan

    2017-12-01

    Urine collection systems with aspiration system for vacuum tubes are becoming increasingly common for urinalysis, especially for microscopic examination of the urine. In this study, we aimed to examine whether vacuum aspiration of the urine sample has any adverse effect on sediment analysis by comparing results from vacuum and non-vacuum urine tubes. The study included totally 213 urine samples obtained from inpatients and outpatients in our hospital. Urine samples were collected to containers with aspiration system for vacuum tubes. Each sample was aliquoted to both vacuum and non-vacuum urine tubes. Urinary sediment analysis was performed using manual microscope. Results were evaluated using chi-square test. Comparison of the sediment analysis results from vacuum and non-vacuum urine tubes showed that results were highly concordant for erythrocyte, leukocyte and epithelial cells (gamma values 1, 0.997, and 0.994, respectively; p < .001). Results were also concordant for urinary casts, crystals and yeast (kappa values 0.815, 0.945 and 1, respectively; p < .001). The results show that in urinary sediment analysis, vacuum aspiration has no adverse effect on the cellular components except on casts.

  4. Hot vacuum creep forming of scale shuttle external tank dome caps

    NASA Technical Reports Server (NTRS)

    Thomas, A. O.

    1974-01-01

    The feasibility of forming shuttle external tank dome caps by hot vacuum creep was investigated for a sub-scale configuration. Aluminum 2219-T37 at an elevated temperature equivalent to the artificial aging time and temperature was used to produce the T87 condition while achieving MIL-HBK -5 properties of 2219-T87 aluminum alloy material. A feasibility analysis was conducted in two phases: the design and build of a sub-scale hot vacuum creep forming (HVCF) die and the forming evaluation of various cap configurations. The contour was constant in all evaluations. This configuration was found to be too severe for the limited forming force available by HVCF.

  5. Demonstrations with a Vacuum: Old Demonstrations for New Vacuum Pumps.

    ERIC Educational Resources Information Center

    Greenslade, Thomas B., Jr.

    1989-01-01

    Explains mechanisms of 19th-century vacuum pumps. Describes demonstrations using the pump including guinea and feather tube, aurora tube, electric egg, Gassiots cascade, air mill, bell in vacuum, density and buoyancy of air, fountain in vacuum, mercury shower, palm and bladder glasses, Bacchus demonstration, pneumatic man-lifter, and Magdeburg…

  6. Towards a Theory on the Impact of School Inspections

    ERIC Educational Resources Information Center

    Ehren, M.C.M.; Visscher, A.J.

    2006-01-01

    This article describes a theory about the ambition of most Inspectorates to realise 'school improvement through inspection'. Literature about a number of direct and indirect interventions, such as reciprocity, communication and feedback is used to build a theoretical model stating the relations between working methods of school inspectors,…

  7. Towards a Theory OMN the Impact of School Inspections

    ERIC Educational Resources Information Center

    Ehren, M. C. M.; Visscher, A. J.

    2006-01-01

    This article describes a theory about the ambition of most Inspectorates to realise "school improvement through inspection." Literature about a number of direct and indirect interventions, such as reciprocity, communication and feedback is used to build a theoretical model stating the relations between working methods of school inspectors,…

  8. 15 CFR 270.323 - Requests for permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... Team, the Lead Investigator or their designee may request permission to enter and inspect property... be inspected and to carry out the duties of the Team. (b) Requests for permission to enter and...

  9. 15 CFR 270.323 - Requests for permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... Team, the Lead Investigator or their designee may request permission to enter and inspect property... be inspected and to carry out the duties of the Team. (b) Requests for permission to enter and...

  10. 15 CFR 270.323 - Requests for permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... Team, the Lead Investigator or their designee may request permission to enter and inspect property... be inspected and to carry out the duties of the Team. (b) Requests for permission to enter and...

  11. 15 CFR 270.323 - Requests for permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... Team, the Lead Investigator or their designee may request permission to enter and inspect property... be inspected and to carry out the duties of the Team. (b) Requests for permission to enter and...

  12. 15 CFR 270.323 - Requests for permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... Team, the Lead Investigator or their designee may request permission to enter and inspect property... be inspected and to carry out the duties of the Team. (b) Requests for permission to enter and...

  13. Improved Vacuum Bazooka

    NASA Astrophysics Data System (ADS)

    Cockman, John

    2003-04-01

    This apparatus is a modification to the well-known "vacuum bazooka" (PIRA 2B30.70). My vacuum bazooka is easy to construct and demonstrate, requires no precise fittings, foil, or vacuum grease, and propels ping-pong balls at a tremendous velocity!

  14. Implementation of EPICS based vacuum control system for variable energy cyclotron centre, Kolkata

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Roy, Anindya, E-mail: r-ani@vecc.gov.in; Bhole, R. B.; Nandy, Partha P.

    2015-03-15

    The vacuum system of the Room Temperature (K = 130) Cyclotron of Variable Energy Cyclotron Centre is comprised of vacuum systems of main machine and Beam Transport System. The vacuum control system is upgraded to a PLC based Automated system from the initial relay based Manual system. The supervisory control of the vacuum system is implemented in Experimental Physics and Industrial Control System (EPICS). An EPICS embedded ARM based vacuum gauge controller is developed to mitigate the requirement of vendor specific gauge controller for gauges and also for seamless integration of the gauge controllers with the control system. A setmore » of MS-Windows ActiveX components with embedded EPICS Channel Access interface are developed to build operator interfaces with less complex programming and to incorporate typical Windows feature, e.g., user authentication, file handling, better fonts, colors, mouse actions etc. into the operator interfaces. The control parameters, monitoring parameters, and system interlocks of the system are archived in MySQL based EPICS MySQL Archiver developed indigenously. In this paper, we describe the architecture, the implementation details, and the performance of the system.« less

  15. Wear of Steel and Ti6Al4V Rollers in Vacuum

    NASA Technical Reports Server (NTRS)

    Krantz, Timothy L.; Shareef, Iqbal

    2012-01-01

    This investigation was prompted by results of a qualification test of a mechanism to be used for the James Webb Space Telescope. Post-test inspections of the qualification test article revealed some loose wear debris and wear of the steel rollers and the mating Ti6Al4V surfaces. An engineering assessment of the design and observations from the tested qualification unit suggested that roller misalignment was a controlling factor. The wear phenomena were investigated using dedicated laboratory experiments. Tests were done using a vacuum roller rig for a range of roller misalignment angles. The wear in these tests was mainly adhesive wear. The measured wear rates were highly correlated to the misalignment angle. For all tests with some roller misalignment, the steel rollers lost mass while the titanium rollers gained mass indicating strong adhesion of the steel with the titanium alloy. Inspection of the rollers revealed that the adhesive wear was a two-way process as titanium alloy was found on the steel rollers and vice versa. The qualification test unit made use of 440F steel rollers in the annealed condition. Both annealed 440F steel rollers and hardened 440C rollers were tested in the vacuum roller rig to investigate possibility to reduce wear rates and the risk of loose debris formation. The 440F and 440C rollers had differing wear behaviors with significantly lesser wear rates for the 440C. For the test condition of zero roller misalignment, the adhesive wear rates were very low, but still some loose debris was formed

  16. Design of a laser navigation system for the inspection robot used in substation

    NASA Astrophysics Data System (ADS)

    Zhu, Jing; Sun, Yanhe; Sun, Deli

    2017-01-01

    Aimed at the deficiency of the magnetic guide and RFID parking system used by substation inspection robot now, a laser navigation system is designed, and the system structure, the method of map building and positioning are all introduced. The system performance is tested in a 500kV substation, and the result show that the repetitive precision of navigation system is precise enough to help the robot fulfill inspection tasks.

  17. 46 CFR 153.812 - Inspection for Certificate of Inspection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Inspection for Certificate of Inspection. 153.812... CARGOES SHIPS CARRYING BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Testing and Inspection § 153.812 Inspection for Certificate of Inspection. The rules governing the...

  18. Innovative Sensors for Pipeline Crawlers: Rotating Permanent Magnet Inspection

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    J. Bruce Nestleroth; Richard J. Davis; Stephanie Flamberg

    2006-09-30

    small with respect to the bore of the pipe to pass obstructions that limit the application of many inspection technologies. Also, since the largest dimension of the Hall Effect sensor is two tenths of an inch, the sensor packages can be small, flexible and light. The power consumption, on the order of ten watts, is low compared to some inspection systems; this would enable autonomous systems to inspect longer distances between charges. This project showed there are no technical barriers to building a field ready unit that can pass through narrow obstructions, such as plug valves. The next step in project implementation is to build a field ready unit that can begin to establish optimal performance capabilities including detection thresholds, sizing capability, and wall thickness limitations.« less

  19. The Classical Vacuum.

    ERIC Educational Resources Information Center

    Boyer, Timothy H.

    1985-01-01

    The classical vacuum of physics is not empty, but contains a distinctive pattern of electromagnetic fields. Discovery of the vacuum, thermal spectrum, classical electron theory, zero-point spectrum, and effects of acceleration are discussed. Connection between thermal radiation and the classical vacuum reveals unexpected unity in the laws of…

  20. Electroweak vacuum instability and renormalized Higgs field vacuum fluctuations in the inflationary universe

    NASA Astrophysics Data System (ADS)

    Kohri, Kazunori; Matsui, Hiroki

    2017-08-01

    In this work, we investigated the electroweak vacuum instability during or after inflation. In the inflationary Universe, i.e., de Sitter space, the vacuum field fluctuations < δ phi 2 > enlarge in proportion to the Hubble scale H2. Therefore, the large inflationary vacuum fluctuations of the Higgs field < δ phi 2 > are potentially catastrophic to trigger the vacuum transition to the negative-energy Planck-scale vacuum state and cause an immediate collapse of the Universe. However, the vacuum field fluctuations < δ phi 2 >, i.e., the vacuum expectation values have an ultraviolet divergence, and therefore a renormalization is necessary to estimate the physical effects of the vacuum transition. Thus, in this paper, we revisit the electroweak vacuum instability from the perspective of quantum field theory (QFT) in curved space-time, and discuss the dynamical behavior of the homogeneous Higgs field phi determined by the effective potential V eff( phi ) in curved space-time and the renormalized vacuum fluctuations < δ phi 2 >ren via adiabatic regularization and point-splitting regularization. We simply suppose that the Higgs field only couples the gravity via the non-minimal Higgs-gravity coupling ξ(μ). In this scenario, the electroweak vacuum stability is inevitably threatened by the dynamical behavior of the homogeneous Higgs field phi, or the formations of AdS domains or bubbles unless the Hubble scale is small enough H< ΛI .

  1. Germanium detector vacuum encapsulation

    NASA Technical Reports Server (NTRS)

    Madden, N. W.; Malone, D. F.; Pehl, R. H.; Cork, C. P.; Luke, P. N.; Landis, D. A.; Pollard, M. J.

    1991-01-01

    This paper describes an encapsulation technology that should significantly improve the viability of germanium gamma-ray detectors for a number of important applications. A specialized vacuum chamber has been constructed in which the detector and the encapsulating module are processed in high vacuum. Very high vacuum conductance is achieved within the valveless encapsulating module. The detector module is then sealed without breaking the chamber vacuum. The details of the vacuum chamber, valveless module, processing, and sealing method are presented.

  2. Development of High Interruption Capability Vacuum Circuit Breaker -Technology of Vacuum Arc Control-

    NASA Astrophysics Data System (ADS)

    Niwa, Yoshimitsu; Kaneko, Eiji

    Vacuum circuit breakers (VCB) have been widely used for power distribution systems. Vacuum Interrupters, which are the current interruption unit, have been increased its interruption capability with the development of vacuum arc control technology by magnetic field. There are three major type electrodes: disk shaped electrodes, radial magnetic field electrodes, axial magnetic field (AMF) electrodes. In the disk shaped electrode, the vacuum arc between the electrodes is not controlled. In the AMF electrode, the vacuum arc is diffused and stabilized by an axial magnetic field, which is parallel to the arc current. In the last type of electrodes, the vacuum arc column is rotated by magnetic force generated by the current flowing in the electrodes. The interruption current and the voltage of one break VCB is increased to 100 kA, 144 kV respectively. This paper describes basic configurations and functions of VCB, vacuum arc control technology in vacuum interrupters, recent researches and applications of VCB.

  3. Electroweak vacuum instability and renormalized Higgs field vacuum fluctuations in the inflationary universe

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kohri, Kazunori; Matsui, Hiroki, E-mail: kohri@post.kek.jp, E-mail: matshiro@post.kek.jp

    In this work, we investigated the electroweak vacuum instability during or after inflation. In the inflationary Universe, i.e., de Sitter space, the vacuum field fluctuations < δ φ {sup 2} > enlarge in proportion to the Hubble scale H {sup 2}. Therefore, the large inflationary vacuum fluctuations of the Higgs field < δ φ {sup 2} > are potentially catastrophic to trigger the vacuum transition to the negative-energy Planck-scale vacuum state and cause an immediate collapse of the Universe. However, the vacuum field fluctuations < δ φ {sup 2} >, i.e., the vacuum expectation values have an ultraviolet divergence, andmore » therefore a renormalization is necessary to estimate the physical effects of the vacuum transition. Thus, in this paper, we revisit the electroweak vacuum instability from the perspective of quantum field theory (QFT) in curved space-time, and discuss the dynamical behavior of the homogeneous Higgs field φ determined by the effective potential V {sub eff}( φ ) in curved space-time and the renormalized vacuum fluctuations < δ φ {sup 2} >{sub ren} via adiabatic regularization and point-splitting regularization. We simply suppose that the Higgs field only couples the gravity via the non-minimal Higgs-gravity coupling ξ(μ). In this scenario, the electroweak vacuum stability is inevitably threatened by the dynamical behavior of the homogeneous Higgs field φ, or the formations of AdS domains or bubbles unless the Hubble scale is small enough H < Λ {sub I} .« less

  4. Development of High Performance Composite Foam Insulation with Vacuum Insulation Cores

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Biswas, Kaushik; Desjarlais, Andre Omer; SmithPhD, Douglas

    Development of a high performance thermal insulation (thermal resistance or R-value per inch of R-12 hr-ft2- F/Btu-in or greater), with twice the thermal resistance of state-of-the-art commercial insulation materials ( R6/inch for foam insulation), promises a transformational impact in the area of building insulation. In 2010, in the US, the building envelope-related primary energy consumption was 15.6 quads, of which 5.75 quads were due to opaque wall and roof sections; the total US consumption (building, industrial and transportation) was 98 quads. In other words, the wall and roof contribution was almost 6% of the entire US primary energy consumption. Buildingmore » energy modeling analyses have shown that adding insulation to increase the R-value of the external walls of residential buildings by R10-20 (hr-ft2- F/Btu) can yield savings of 38-50% in wall-generated heating and cooling loads. Adding R20 will require substantial thicknesses of current commercial insulation materials, often requiring significant (and sometimes cost-prohibitive) alterations to existing buildings. This article describes the development of a next-generation composite insulation with a target thermal resistance of R25 for a 2 inch thick board (R12/inch or higher). The composite insulation will contain vacuum insulation cores, which are nominally R35-40/inch, encapsulated in polyisocyanurate foam. A recently-developed variant of vacuum insulation, called modified atmosphere insulation (MAI), was used in this research. Some background information on the thermal performance and distinguishing features of MAI has been provided. Technical details of the composite insulation development and manufacturing as well as laboratory evaluation of prototype insulation boards are presented.« less

  5. Manual for Public School Facilities: Fire Prevention and Fire Inspection.

    ERIC Educational Resources Information Center

    New York State Education Dept., Albany. Bureau of Educational Management Services.

    This manual is designed for use by New York public school administrators and facility inspectors, providing instruction for completing the state's Fire Safety Report. It provides background information and details about the State Fire Prevention and Building Code and regulations, and explains the inspection and enforcement processes. One-third of…

  6. Rocket Research Presentation at the NACA's 1947 Inspection

    NASA Image and Video Library

    1947-10-21

    Researcher John Sloop briefs visitors on his latest rocket engine research during the 1947 Inspection at the National Advisory Committee for Aeronautics (NACA) Lewis Flight Propulsion Laboratory. The NACA had been hosting annual Aircraft Engineering Conferences, better known as Inspections, since 1926. Individuals from the manufacturing industry, military, and university settings were invited to tour the NACA laboratories. There were a series of stops on the tour, mostly at test facilities, where researchers would brief the group on the latest efforts in their particular field. The Inspections grew in size and scope over the years and by the mid-1940s required multiple days. The three-day 1947 Inspection was the first time the event was held at NACA Lewis. Over 800 scientists, industrialists, and military leaders attended the three-day event. Talks were given at the Altitude Wind Tunnel, Four Burner Area, Engine Research Building, and other facilities. An array of topics were discussed, including full-scale engine testing, ramjets, axial-flow compressors, turbojets, fuels, icing, and materials. The NACA Lewis staff and their families were able to view the same presentations after the Inspection was over. Sloop, a researcher in the Fuels and Thermodynamics Division, briefed visitors on NACA Lewis’ early research in rocket engine propellants, combustion, and cooling. This early NACA Lewis work led to the development of liquid hydrogen as a viable propellant in the late 1950s.

  7. Radiation hard vacuum switch

    DOEpatents

    Boettcher, Gordon E.

    1990-01-01

    A vacuum switch with an isolated trigger probe which is not directly connected to the switching electrodes. The vacuum switch within the plasmatron is triggered by plasma expansion initiated by the trigger probe which travels through an opening to reach the vacuum switch elements. The plasma arc created is directed by the opening to the space between the anode and cathode of the vacuum switch to cause conduction.

  8. Radiation hard vacuum switch

    DOEpatents

    Boettcher, Gordon E.

    1990-03-06

    A vacuum switch with an isolated trigger probe which is not directly connected to the switching electrodes. The vacuum switch within the plasmatron is triggered by plasma expansion initiated by the trigger probe which travels through an opening to reach the vacuum switch elements. The plasma arc created is directed by the opening to the space between the anode and cathode of the vacuum switch to cause conduction.

  9. Isolating The Building Thermal Envelope

    NASA Astrophysics Data System (ADS)

    Harrje, D. T.; Dutt, G. S.; Gadsby, K. J.

    1981-01-01

    The evaluation of the thermal integrity of building envelopes by infrared scanning tech-niques is often hampered in mild weather because temperature differentials across the envelope are small. Combining the infrared scanning with positive or negative building pressures, induced by a "blower door" or the building ventilation system, considerably extends the periods during which meaningful diagnostics can be conducted. Although missing or poorly installed insulation may lead to a substantial energy penalty, it is the search for air leakage sites that often has the largest potential for energy savings. Infrared inspection of the attic floor with air forced from the occupied space through ceiling by-passes, and inspecting the interior of the building when outside air is being sucked through the envelope reveals unexpected leakage sites. Portability of the diagnostic equipment is essential in these surveys which may include access into some tight spaces. A catalog of bypass heat losses that have been detected in residential housing using the combined infrared pressure differential technique is included to point out the wide variety of leakage sites which may compromise the benefits of thermal insulation and allow excessive air infiltration. Detection and suppression of such leaks should be key items in any building energy audit program. Where a calibrated blower door is used to pressurize or evacuate the house, the leakage rate can be quantified and an excessively tight house recognized. Houses that are too tight may be improved with a minimal energy penalty by forced ventilation,preferably with a heat recuperator and/or by providing combustion air directly to the furnace.

  10. Vacuum fluctuations in an ancestor vacuum: A possible dark energy candidate

    NASA Astrophysics Data System (ADS)

    Aoki, Hajime; Iso, Satoshi; Lee, Da-Shin; Sekino, Yasuhiro; Yeh, Chen-Pin

    2018-02-01

    We consider an open universe created by bubble nucleation, and study possible effects of our "ancestor vacuum," a de Sitter space in which bubble nucleation occurred, on the present universe. We compute vacuum expectation values of the energy-momentum tensor for a minimally coupled scalar field, carefully taking into account the effect of the ancestor vacuum by the Euclidean prescription. We pay particular attention to the so-called supercurvature mode, a non-normalizable mode on a spatial slice of the open universe, which has been known to exist for sufficiently light fields. This mode decays in time most slowly, and may leave residual effects of the ancestor vacuum, potentially observable in the present universe. We point out that the vacuum energy of the quantum field can be regarded as dark energy if mass of the field is of order the present Hubble parameter or smaller. We obtain preliminary results for the dark energy equation of state w (z ) as a function of the redshift.

  11. 15 CFR 270.325 - Notice of authority to enter and inspect property where building components, materials, artifacts...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... pursuant to the Act, any member of a Team, or any other person authorized by the Director to support a Team... property to be inspected and to carry out the duties of the Team; (2) During reasonable hours, inspect any...

  12. 15 CFR 270.325 - Notice of authority to enter and inspect property where building components, materials, artifacts...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... pursuant to the Act, any member of a Team, or any other person authorized by the Director to support a Team... property to be inspected and to carry out the duties of the Team; (2) During reasonable hours, inspect any...

  13. 15 CFR 270.325 - Notice of authority to enter and inspect property where building components, materials, artifacts...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... pursuant to the Act, any member of a Team, or any other person authorized by the Director to support a Team... property to be inspected and to carry out the duties of the Team; (2) During reasonable hours, inspect any...

  14. 15 CFR 270.325 - Notice of authority to enter and inspect property where building components, materials, artifacts...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... pursuant to the Act, any member of a Team, or any other person authorized by the Director to support a Team... property to be inspected and to carry out the duties of the Team; (2) During reasonable hours, inspect any...

  15. 15 CFR 270.325 - Notice of authority to enter and inspect property where building components, materials, artifacts...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... pursuant to the Act, any member of a Team, or any other person authorized by the Director to support a Team... property to be inspected and to carry out the duties of the Team; (2) During reasonable hours, inspect any...

  16. Vacuum Virtues

    ERIC Educational Resources Information Center

    Rathey, Allen

    2007-01-01

    Upright vacuums, like cars, vary in quality, features and performance. Like automobiles, some uprights are reliable, others may be problematic, and some become a problem as a result of neglect or improper use. So, how do education institutions make an informed choice and, having done so, ensure that an upright vacuum goes the distance? In this…

  17. Pathology Residents Comprise Inspection Team for a CAP Self-Inspection.

    PubMed

    Beal, Stacy G; Kresak, Jesse L; Yachnis, Anthony T

    2017-01-01

    We report our experience at the University of Florida in which residents and fellows served as the inspection team for a College of American Pathologists (CAP) self-inspection. We aimed to determine whether the CAP self-inspection could serve as a learning opportunity for pathology residents and fellows. To prepare for the inspection, we provided a series of 4 lunchtime seminars covering numerous laboratory management topics relating to inspections and laboratory quality. Preparation for the inspection began approximately 4 months prior to the date of the inspection. The intent was to simulate a CAP peer inspection, with the exception that the date was announced. The associate residency program director served as the team leader. All residents and fellows completed inspector training provided by CAP, and the team leader completed the team leader training. A 20 question pre- and posttest was administered; additionally, an anonymous survey was given after the inspection. The residents' and fellows' posttest scores were an average of 15% higher than on the pretest ( P < .01). The surveys as well as subjective comments were overwhelmingly positive. In conclusion, the resident's and fellow's experience as an inspector during a CAP self-inspection was a useful tool to learn accreditation and laboratory management.

  18. Pathology Residents Comprise Inspection Team for a CAP Self-Inspection

    PubMed Central

    Kresak, Jesse L.; Yachnis, Anthony T.

    2017-01-01

    We report our experience at the University of Florida in which residents and fellows served as the inspection team for a College of American Pathologists (CAP) self-inspection. We aimed to determine whether the CAP self-inspection could serve as a learning opportunity for pathology residents and fellows. To prepare for the inspection, we provided a series of 4 lunchtime seminars covering numerous laboratory management topics relating to inspections and laboratory quality. Preparation for the inspection began approximately 4 months prior to the date of the inspection. The intent was to simulate a CAP peer inspection, with the exception that the date was announced. The associate residency program director served as the team leader. All residents and fellows completed inspector training provided by CAP, and the team leader completed the team leader training. A 20 question pre- and posttest was administered; additionally, an anonymous survey was given after the inspection. The residents’ and fellows’ posttest scores were an average of 15% higher than on the pretest (P < .01). The surveys as well as subjective comments were overwhelmingly positive. In conclusion, the resident’s and fellow’s experience as an inspector during a CAP self-inspection was a useful tool to learn accreditation and laboratory management. PMID:28725788

  19. Microfabricated triggered vacuum switch

    DOEpatents

    Roesler, Alexander W [Tijeras, NM; Schare, Joshua M [Albuquerque, NM; Bunch, Kyle [Albuquerque, NM

    2010-05-11

    A microfabricated vacuum switch is disclosed which includes a substrate upon which an anode, cathode and trigger electrode are located. A cover is sealed over the substrate under vacuum to complete the vacuum switch. In some embodiments of the present invention, a metal cover can be used in place of the trigger electrode on the substrate. Materials used for the vacuum switch are compatible with high vacuum, relatively high temperature processing. These materials include molybdenum, niobium, copper, tungsten, aluminum and alloys thereof for the anode and cathode. Carbon in the form of graphitic carbon, a diamond-like material, or carbon nanotubes can be used in the trigger electrode. Channels can be optionally formed in the substrate to mitigate against surface breakdown.

  20. Testing of improved polyimide actuator rod seals at high temperature and under vacuum conditions for use in advanced aircraft hydraulic systems

    NASA Technical Reports Server (NTRS)

    Sellereite, B. K.; Waterman, A. W.; Nelson, W. G.

    1974-01-01

    Polyimide second-stage rod seals were evaluated to determine their suitability for applications in space station environments. The 6.35-cm (2.5-in.)K-section seal was verified for thermal cycling operation between room temperature and 478 K (400 F) and for operation in a 133 micron PA(0.000001 mm Hg) vacuum environment. The test seal completed the scheduled 96 thermal cycles and 1438 hr in vacuum with external rod seal leakage well within the maximum allowable of two drops per 25 actuation cycles. At program completion, the seals showed no signs of structural degradation. Posttest inspection showed the seals retained a snug fit against the shaft and housing walls, indicating additional wear life capability. Evaluation of a molecular flow section during vacuum testing, to inhibit fluid loss through vaporization, showed it to be beneficial with MIL-H-5606, a petroleum-base fluid, in comparison with MIL-H-83282, a synthetic hydrocarbon-base fluid.

  1. Influence of Gap Distance on Vacuum Arc Characteristics of Cup Type AMF Electrode in Vacuum Interrupters

    NASA Astrophysics Data System (ADS)

    Cheng, Shaoyong; Xiu, Shixin; Wang, Jimei; Shen, Zhengchao

    2006-11-01

    The greenhouse effect of SF6 is a great concern today. The development of high voltage vacuum circuit breakers becomes more important. The vacuum circuit breaker has minimum pollution to the environment. The vacuum interrupter is the key part of a vacuum circuit breaker. The interrupting characteristics in vacuum and arc-controlling technique are the main problems to be solved for a longer gap distance in developing high voltage vacuum interrupters. To understand the vacuum arc characteristics and provide effective technique to control vacuum arc in a long gap distance, the arc mode transition of a cup-type axial magnetic field electrode is observed by a high-speed charge coupled device (CCD) video camera under different gap distances while the arc voltage and arc current are recorded. The controlling ability of the axial magnetic field on vacuum arc obviously decreases when the gap distance is longer than 40 mm. The noise components and mean value of the arc voltage significantly increase. The effective method for controlling the vacuum arc characteristics is provided by long gap distances based on the test results. The test results can be used as a reference to develop high voltage and large capacity vacuum interrupters.

  2. 24 CFR 3282.362 - Production Inspection Primary Inspection Agencies (IPIAs).

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... in production which fails to conform to the design or where the design is not specific, to the... 24 Housing and Urban Development 5 2010-04-01 2010-04-01 false Production Inspection Primary... REGULATIONS Primary Inspection Agencies § 3282.362 Production Inspection Primary Inspection Agencies (IPIAs...

  3. 2-kW Solar Dynamic Space Power System Tested in Lewis' Thermal Vacuum Facility

    NASA Technical Reports Server (NTRS)

    1995-01-01

    Working together, a NASA/industry team successfully operated and tested a complete solar dynamic space power system in a large thermal vacuum facility with a simulated sun. This NASA Lewis Research Center facility, known as Tank 6 in building 301, accurately simulates the temperatures, high vacuum, and solar flux encountered in low-Earth orbit. The solar dynamic space power system shown in the photo in the Lewis facility, includes the solar concentrator and the solar receiver with thermal energy storage integrated with the power conversion unit. Initial testing in December 1994 resulted in the world's first operation of an integrated solar dynamic system in a relevant environment.

  4. 9 CFR 381.68 - Maximum inspection rates-New turkey inspection system.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Maximum inspection rates-New turkey... Procedures § 381.68 Maximum inspection rates—New turkey inspection system. (a) The maximum inspection rates for one inspector New Turkey Inspection (NTI-1 and NTI-1 Modified) and two inspectors New Turkey...

  5. 9 CFR 381.68 - Maximum inspection rates-New turkey inspection system.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Maximum inspection rates-New turkey... Procedures § 381.68 Maximum inspection rates—New turkey inspection system. (a) The maximum inspection rates for one inspector New Turkey Inspection (NTI-1 and NTI-1 Modified) and two inspectors New Turkey...

  6. 9 CFR 381.68 - Maximum inspection rates-New turkey inspection system.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Maximum inspection rates-New turkey... Procedures § 381.68 Maximum inspection rates—New turkey inspection system. (a) The maximum inspection rates for one inspector New Turkey Inspection (NTI-1 and NTI-1 Modified) and two inspectors New Turkey...

  7. 9 CFR 381.68 - Maximum inspection rates-New turkey inspection system.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Maximum inspection rates-New turkey... Procedures § 381.68 Maximum inspection rates—New turkey inspection system. (a) The maximum inspection rates for one inspector New Turkey Inspection (NTI-1 and NTI-1 Modified) and two inspectors New Turkey...

  8. 9 CFR 381.68 - Maximum inspection rates-New turkey inspection system.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Maximum inspection rates-New turkey... Procedures § 381.68 Maximum inspection rates—New turkey inspection system. (a) The maximum inspection rates for one inspector New Turkey Inspection (NTI-1 and NTI-1 Modified) and two inspectors New Turkey...

  9. Inspection design using 2D phased array, TFM and cueMAP software

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    McGilp, Ailidh; Dziewierz, Jerzy; Lardner, Tim

    2014-02-18

    A simulation suite, cueMAP, has been developed to facilitate the design of inspection processes and sparse 2D array configurations. At the core of cueMAP is a Total Focusing Method (TFM) imaging algorithm that enables computer assisted design of ultrasonic inspection scenarios, including the design of bespoke array configurations to match the inspection criteria. This in-house developed TFM code allows for interactive evaluation of image quality indicators of ultrasonic imaging performance when utilizing a 2D phased array working in FMC/TFM mode. The cueMAP software uses a series of TFM images to build a map of resolution, contrast and sensitivity of imagingmore » performance of a simulated reflector, swept across the inspection volume. The software takes into account probe properties, wedge or water standoff, and effects of specimen curvature. In the validation process of this new software package, two 2D arrays have been evaluated on 304n stainless steel samples, typical of the primary circuit in nuclear plants. Thick section samples have been inspected using a 1MHz 2D matrix array. Due to the processing efficiency of the software, the data collected from these array configurations has been used to investigate the influence sub-aperture operation on inspection performance.« less

  10. Vacuum probe surface sampler

    NASA Technical Reports Server (NTRS)

    Zahlava, B. A. (Inventor)

    1973-01-01

    A vacuum probe surface sampler is described for rapidly sampling relatively large surface areas which possess relatively light loading densities of micro-organism, drug particles or the like. A vacuum head with a hollow handle connected to a suitable vacuum source is frictionally attached to a cone assembly terminating in a flared tip adapted to be passed over the surface to be sampled. A fine mesh screen carried by the vacuum head provides support for a membrane filter which collects the microorganisms or other particles. The head assembly is easily removed from the cone assembly without contacting the cone assembly with human hands.

  11. Improving meat inspection and control in resource-poor communities: the Nepal example.

    PubMed

    Joshi, Durga Datt; Maharjan, Mahendra; Johansen, Maria Vang; Willingham, Arve Lee; Sharma, Minu

    2003-06-01

    to be recommended. Sustainable capacity building should be introduced including training of veterinarians, meat inspectors and butchers as well as building of slaughter facilities. Government policies on slaughter procedures including ante-mortem examination, meat inspection and stamping of meat should be implemented. Programmes should be instituted with strong focus on prevention and control of meat-borne diseases to reduce infection risk of consumers and meat handlers and to avoid contamination of the environment. Lastly, emphasis should be put on improving the animal husbandry system in Nepal. These same actions can be undertaken in other developing countries to assist with improving meat inspection and control, thus helping with prevention and control of cysticercosis as well as other important meat-borne diseases.

  12. Comparison of work rates, energy expenditure, and perceived exertion during a 1-h vacuuming task with a backpack vacuum cleaner and an upright vacuum cleaner.

    PubMed

    Mengelkoch, Larry J; Clark, Kirby

    2006-03-01

    The purpose of this study was to evaluate two types of industrial vacuum cleaners, in terms of cleaning rates, energy expenditure, and perceived exertion. Twelve industrial cleaners (six males and six females, age 28-39 yr) performed two 1-h vacuuming tasks with an upright vacuum cleaner (UVC) and a backpack vacuum cleaner (BPVC). Measures for oxygen uptake (VO2) and ratings of perceived exertion (RPE) were collected continuously during the 1-h vacuuming tasks. Cleaning rates for the UVC and BPVC were 7.23 and 14.98 m2min(-1), respectively. On a separate day subjects performed a maximal treadmill exercise test to determine their maximal aerobic capacity (peak VO2). Average absolute energy costs (in Metabolic equivalents), relative energy costs of the vacuum task compared to the subjects' maximal aerobic capacity (% peak VO2), and RPE responses for the 1-h vacuuming tasks were similar between vacuum cleaners, but % peak VO2 and RPE values differed between genders. These results indicate that the BPVC was more efficient than the UVC. With the BPVC, experienced workers vacuumed at a cleaning rate 2.07 times greater than the UVC and had similar levels of energy expenditure and perceived effort, compared to the slower cleaning rate with the UVC.

  13. Optomechanical design of the vacuum compatible EXCEDE's mission testbed

    NASA Astrophysics Data System (ADS)

    Bendek, Eduardo A.; Belikov, Ruslan; Lozi, Julien; Schneider, Glenn; Thomas, Sandrine; Pluzhnik, Eugene; Lynch, Dana

    2014-08-01

    In this paper we describe the opto-mechanical design, tolerance error budget an alignment strategies used to build the Starlight Suppression System (SSS) for the Exoplanetary Circumstellar Environments and Disk Explorer (EXCEDE) NASA's mission. EXCEDE is a highly efficient 0.7m space telescope concept designed to directly image and spatially resolve circumstellar disks with as little as 10 zodis of circumstellar dust, as well as large planets. The main focus of this work was the design of a vacuum compatible opto-mechanical system that allows remote alignment and operation of the main components of the EXCEDE. SSS, which are: a Phase Induced Amplitude Apodization (PIAA) coronagraph to provide high throughput and high contrast at an inner working angle (IWA) equal to the diffraction limit (IWA = 1.2 l/D), a wavefront (WF) control system based on a Micro-Electro-Mechanical-System deformable mirror (MEMS DM), and low order wavefront sensor (LOWFS) for fine pointing and centering. We describe in strategy and tolerance error budget for this system, which is especially relevant to achieve the theoretical performance that PIAA coronagraph can offer. We also discuss the vacuum cabling design for the actuators, cameras and the Deformable Mirror. This design has been implemented at the vacuum chamber facility at Lockheed Martin (LM), which is based on successful technology development at the Ames Coronagraph Experiment (ACE) facility.

  14. Credit PSR. This interior view shows the vacuum tumble dryer. ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Credit PSR. This interior view shows the vacuum tumble dryer. The tumble dryer is lined with a water jacket to maintain temperature during the drying of ammonium perchlorate ("AP"); water enters and exits the dryer jacket through the pipe fittings along the horizontal center line of the dryer. The wall at the right is constructed to blow out in the event of an explosion - Jet Propulsion Laboratory Edwards Facility, Oxidizer Dryer Building, Edwards Air Force Base, Boron, Kern County, CA

  15. A novel methodology for building robust design rules by using design based metrology (DBM)

    NASA Astrophysics Data System (ADS)

    Lee, Myeongdong; Choi, Seiryung; Choi, Jinwoo; Kim, Jeahyun; Sung, Hyunju; Yeo, Hyunyoung; Shim, Myoungseob; Jin, Gyoyoung; Chung, Eunseung; Roh, Yonghan

    2013-03-01

    This paper addresses a methodology for building robust design rules by using design based metrology (DBM). Conventional method for building design rules has been using a simulation tool and a simple pattern spider mask. At the early stage of the device, the estimation of simulation tool is poor. And the evaluation of the simple pattern spider mask is rather subjective because it depends on the experiential judgment of an engineer. In this work, we designed a huge number of pattern situations including various 1D and 2D design structures. In order to overcome the difficulties of inspecting many types of patterns, we introduced Design Based Metrology (DBM) of Nano Geometry Research, Inc. And those mass patterns could be inspected at a fast speed with DBM. We also carried out quantitative analysis on PWQ silicon data to estimate process variability. Our methodology demonstrates high speed and accuracy for building design rules. All of test patterns were inspected within a few hours. Mass silicon data were handled with not personal decision but statistical processing. From the results, robust design rules are successfully verified and extracted. Finally we found out that our methodology is appropriate for building robust design rules.

  16. A radiation hard vacuum switch

    DOEpatents

    Boettcher, G.E.

    1988-07-19

    A vacuum switch with an isolated trigger probe which is not directly connected to the switching electrodes. The vacuum switch within the plasmatron is triggered by plasma expansion initiated by the trigger probe which travels through an opening to reach the vacuum switch elements. The plasma arc created is directed by the opening to the space between the anode and cathode of the vacuum switch to cause conduction. 3 figs.

  17. Dynamic simulation of relief line during loss of insulation vacuum of the ITER cryoline

    NASA Astrophysics Data System (ADS)

    Badgujar, S.; Kosek, J.; Grillot, D.; Forgeas, A.; Sarkar, B.; Shah, N.; Choukekar, K.; Chang, H.-S.

    2017-12-01

    The ITER cryoline (CL) system consists of 37 types of vacuum jacketed transfer lines which forms a complex structured network with a total length of about 5 km, spread inside the Tokamak building, on a dedicated plant bridge and in the Cryoplant building/area. One of them, the low pressure relief line (RL) recovers helium discharged from process safety relief valves of the different cryogenic users and is sent it back to the Cryoplant via heater and recovery system. The process pipe diameters of the RL vary from DN 50 to DN 200 and the length is more than 1500 m. Loss of insulation vacuum (LIV) of a CL is one of the worst scenarios apart from LIV in Auxiliary Cold Boxes (ACBs). The Torus and Cryostat CL is chosen to simulate the virtual LIV and to study the anticipated behavior of the RL. Both helium LIV (LIV due to leak in helium pipe) and air LIV (LIV due to air ingress in outer vacuum jacket of the cryoline) with and without fire) have been simulated during this study. After the brief description of the CL system, the paper will describe the EcosimPro® model prepared for the dynamic study. The paper will also describe the results like minimum temperature of RL, mass flow and maximum pressure in the RL which are essentially used to choose the type and location of safety relief devices to protect the CL process pipes.

  18. Comparison of vacuum rise time, vacuum limit accuracy, and occlusion break surge of 3 new phacoemulsification systems.

    PubMed

    Han, Young Keun; Miller, Kevin M

    2009-08-01

    To compare vacuum rise time, vacuum limit accuracy, and occlusion break surge of 3 new phacoemulsification machines. Jules Stein Eye Institute and Department of Ophthalmology, David Geffen School of Medicine at UCLA, Los Angeles, California, USA. The vacuum rise time under normal and enhanced aspiration modes, vacuum limit accuracy, and occlusion break surge of the Infiniti Vision System, Stellaris Vision Enhancement System, and WhiteStar Signature Phacoemulsification System were tested. Vacuum rise time and limit accuracy were measured at limit settings of 400 mm Hg and 600 mm Hg. Surge area was recorded at vacuum limit settings of 200 mm Hg, 300 mm Hg, 400 mm Hg, and 500 mm Hg. The Infiniti had the fastest vacuum rise times under normal and enhanced aspiration modes. At 4 seconds, the vacuum limit accuracy was greatest with the Infiniti at the 400 mm Hg limit and the Signature at the 600 mm Hg limit. The Stellaris did not reach either vacuum target. The Infiniti performed better than the other 2 machines during testing of occlusion break surge at all vacuum limit settings above 200 mm Hg. Under controlled laboratory test conditions, the Infiniti had the fastest vacuum rise time, greatest vacuum limit accuracy at 400 mm Hg, and least occlusion break surge. These results can be explained by the lower compliance of the Infiniti system.

  19. Numerical Study on Radiation Effects to Evaporator in Natural Vacuum Solar Desalination System

    NASA Astrophysics Data System (ADS)

    Siregar, R. E. T.; Ronowikarto, A. D.; Setyawan, E. Y.; Ambarita, H.

    2018-01-01

    The need for clean water is increasing day by day due to the increasing factor of living standard of mankind, hence designed natural vacuum solar desalination. The natural vacuum Solar desalination is studied experimentally. A small-scale natural vacuum desalination study consists of evaporator and condenser as the main components designed and manufactured. To transfer heat from the solar collector into the evaporator, the fluid transfer system uses a pump powered by a solar cell. Thus, solar collectors are called hybrid solar collectors. The main purpose of this exposure is to know the characteristics of the radiation effects on incoming energy on the evaporator during the process. This system is tested by exposing the unit to the solar radiation in the 4th floor building in Medan. The experiment was conducted from 8.00 to 16.00 local time. The results show that natural vacuum solar desalination with hybrid solar collectors can be operated perfectly. If the received radiation is high, then the incoming energy received by the evaporator will also be high. From measurements with HOBO microstation, obtained the highest radiation 695.6 W/m2, and the calculation result of incoming energy received evaporator obtained highest result 1807.293 W.

  20. Air bearing vacuum seal assembly

    DOEpatents

    Booth, Rex

    1978-01-01

    An air bearing vacuum seal assembly capable of rotating at the speed of several thousand revolutions per minute using an air cushion to prevent the rotating and stationary parts from touching, and a two stage differential pumping arrangement to maintain the pressure gradient between the air cushion and the vacuum so that the leak rate into the vacuum is, for example, less than 1 .times. 10.sup.-4 Pa m.sup.3 /s. The air bearing vacuum seal has particular application for mounting rotating targets to an evacuated accelerator beam tube for bombardment of the targets with high-power charged particle beams in vacuum.

  1. Determinants of the Safety Performance of Private Multi-Storey Residential Buildings in Hong Kong

    ERIC Educational Resources Information Center

    Yau, Yung; Ho, Daniel Chi Wing; Chau, Kwong Wing

    2008-01-01

    Given the high population and development density in Hong Kong, building failures can result in catastrophic consequences. It is thus worthwhile identifying those dilapidated buildings, and this explains why the Hong Kong government has considered launching a mandatory building inspection scheme in the city. Apart from the measurement of building…

  2. Vacuum-Gauge Connection For Shipping Container

    NASA Technical Reports Server (NTRS)

    Henry, Robert H.

    1990-01-01

    External connector enables measurement of vacuum in stored part. Remote-readout connector added to shipping container and connected to thermo-couple vacuum gauge in vacuum-insulated cryogenic line packed in container. Enables monitoring of condition of vacuum without opening container.

  3. Inspection and Emotion

    ERIC Educational Resources Information Center

    Perryman, Jane

    2007-01-01

    In this paper I explore the emotional impact of inspection on the staff of a school in the two years between Ofsted inspections. Using data from one school undergoing inspection, I argue that the negative emotional impact of inspection of teachers goes beyond the oft-reported issues of stress and overwork. Teachers experience a loss of power and…

  4. NSLS II Vacuum System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ferreira, M.; Doom, L.; Hseuh, H.

    2009-09-13

    National Synchrotron Light Source II, being constructed at Brookhaven, is a 3-GeV, 500 mA, 3rd generation synchrotron radiation facility with ultra low emittance electron beams. The storage ring vacuum system has a circumference of 792 m and consists of over 250 vacuum chambers with a simulated average operating pressure of less than 1 x 10{sup -9} mbar. A summary of the update design of the vacuum system including girder supports of the chambers, gauges, vacuum pumps, bellows, beam position monitors and simulation of the average pressure will be shown. A brief description of the techniques and procedures for cleaning andmore » mounting the chambers are given.« less

  5. Software Formal Inspections Guidebook

    NASA Technical Reports Server (NTRS)

    1993-01-01

    The Software Formal Inspections Guidebook is designed to support the inspection process of software developed by and for NASA. This document provides information on how to implement a recommended and proven method for conducting formal inspections of NASA software. This Guidebook is a companion document to NASA Standard 2202-93, Software Formal Inspections Standard, approved April 1993, which provides the rules, procedures, and specific requirements for conducting software formal inspections. Application of the Formal Inspections Standard is optional to NASA program or project management. In cases where program or project management decide to use the formal inspections method, this Guidebook provides additional information on how to establish and implement the process. The goal of the formal inspections process as documented in the above-mentioned Standard and this Guidebook is to provide a framework and model for an inspection process that will enable the detection and elimination of defects as early as possible in the software life cycle. An ancillary aspect of the formal inspection process incorporates the collection and analysis of inspection data to effect continual improvement in the inspection process and the quality of the software subjected to the process.

  6. Effective Porosity Measurements by Wet- and Dry-type Vacuum Saturations using Process-Programmable Vacuum Saturation System

    NASA Astrophysics Data System (ADS)

    Lee, T. J.; Lee, K. S., , Dr; Lee, S. K.

    2017-12-01

    One of the most important factors in measuring effective porosity by vacuum saturation method is that the air in the pore space can be fully substituted by water during the vacuum saturation process. International Society of Rock Mechanics (ISRM) suggests vacuuming a rock sample submerged in the water, while American Society of Test and Materials (ASTM) vacuuming the sample and water separately and then pour the water to the sample. In this study, we call the former wet-type vacuum saturation (WVS) method and the latter dry-type vacuum saturation (DVS) method, and compare the effective porosity measured by the two different vacuum saturation processes. For that purpose, a vacuum saturation system has been developed, which can support both WVS and DVS by only changing the process by programming. Comparison of effective porosity has been made for a cement mortar and rock samples. As a result, DVS can substitute more void volume to water than WVS, which in turn insists that DVS can provide more exact value of effective porosity than WVS.

  7. Indoor Multi-Sensor Acquisition System for Projects on Energy Renovation of Buildings.

    PubMed

    Armesto, Julia; Sánchez-Villanueva, Claudio; Patiño-Cambeiro, Faustino; Patiño-Barbeito, Faustino

    2016-05-28

    Energy rehabilitation actions in buildings have become a great economic opportunity for the construction sector. They also constitute a strategic goal in the European Union (EU), given the energy dependence and the compromises with climate change of its member states. About 75% of existing buildings in the EU were built when energy efficiency codes had not been developed. Approximately 75% to 90% of those standing buildings are expected to remain in use in 2050. Significant advances have been achieved in energy analysis, simulation tools, and computer fluid dynamics for building energy evaluation. However, the gap between predictions and real savings might still be improved. Geomatics and computer science disciplines can really help in modelling, inspection, and diagnosis procedures. This paper presents a multi-sensor acquisition system capable of automatically and simultaneously capturing the three-dimensional geometric information, thermographic, optical, and panoramic images, ambient temperature map, relative humidity map, and light level map. The system integrates a navigation system based on a Simultaneous Localization and Mapping (SLAM) approach that allows georeferencing every data to its position in the building. The described equipment optimizes the energy inspection and diagnosis steps and facilitates the energy modelling of the building.

  8. Indoor Multi-Sensor Acquisition System for Projects on Energy Renovation of Buildings

    PubMed Central

    Armesto, Julia; Sánchez-Villanueva, Claudio; Patiño-Cambeiro, Faustino; Patiño-Barbeito, Faustino

    2016-01-01

    Energy rehabilitation actions in buildings have become a great economic opportunity for the construction sector. They also constitute a strategic goal in the European Union (EU), given the energy dependence and the compromises with climate change of its member states. About 75% of existing buildings in the EU were built when energy efficiency codes had not been developed. Approximately 75% to 90% of those standing buildings are expected to remain in use in 2050. Significant advances have been achieved in energy analysis, simulation tools, and computer fluid dynamics for building energy evaluation. However, the gap between predictions and real savings might still be improved. Geomatics and computer science disciplines can really help in modelling, inspection, and diagnosis procedures. This paper presents a multi-sensor acquisition system capable of automatically and simultaneously capturing the three-dimensional geometric information, thermographic, optical, and panoramic images, ambient temperature map, relative humidity map, and light level map. The system integrates a navigation system based on a Simultaneous Localization and Mapping (SLAM) approach that allows georeferencing every data to its position in the building. The described equipment optimizes the energy inspection and diagnosis steps and facilitates the energy modelling of the building. PMID:27240379

  9. Considerations In The Design And Specifications Of An Automatic Inspection System

    NASA Astrophysics Data System (ADS)

    Lee, David T.

    1980-05-01

    Considerable activities have been centered around the automation of manufacturing quality control and inspection functions. Several reasons can be cited for this development. The continuous pressure of direct and indirect labor cost increase is only one of the obvious motivations. With the drive for electronics miniaturization come more and more complex processes where control parameters are critical and the yield is highly susceptible to inadequate process monitor and inspection. With multi-step, multi-layer process for substrate fabrication, process defects that are not detected and corrected at certain critical points may render the entire subassembly useless. As a process becomes more complex, the time required to test the product increases significantly in the total build cycle. The urgency to reduce test time brings more pressure to improve in-process control and inspection. The advances and improvements of components, assemblies and systems such as micro-processors, micro-computers, programmable controllers, and other intelligent devices, have made the automation of quality control much more cost effective and justifiable.

  10. Shell Inspection History and Current CMM Inspection Efforts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Montano, Joshua Daniel

    The following report provides a review of past and current CMM Shell Inspection efforts. Calibration of the Sheffield rotary contour gauge has expired and the primary inspector, Matthew Naranjo, has retired. Efforts within the Inspection team are transitioning from maintaining and training new inspectors on Sheffield to off-the-shelf CMM technology. Although inspection of a shell has many requirements, the scope of the data presented in this report focuses on the inner contour, outer contour, radial wall thickness and mass comparisons.

  11. 5. LOOKING SOUTHWEST INSIDE OF ELECTRIC FURNACE BUILDING ON GROUND ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    5. LOOKING SOUTHWEST INSIDE OF ELECTRIC FURNACE BUILDING ON GROUND FLOOR OF POURING AISLE. VIEW OF THE NATION'S FIRST VACUUM DEGASSING UNIT (1956). - U.S. Steel Duquesne Works, Electric Furnace Steelmaking Plant, Along Monongahela River, Duquesne, Allegheny County, PA

  12. 320 x 240 uncooled IRFPA with pixel wise thin film vacuum packaging

    NASA Astrophysics Data System (ADS)

    Yon, J.-J.; Dumont, G.; Rabaud, W.; Becker, S.; Carle, L.; Goudon, V.; Vialle, C.; Hamelin, A.; Arnaud, A.

    2012-10-01

    Silicon based vacuum packaging is a key enabling technology for achieving affordable uncooled Infrared Focal Plane Arrays (IRFPA) as required by the promising mass market for very low cost IR applications, such as automotive driving assistance, energy loss monitoring in buildings, motion sensors… Among the various approaches studied worldwide, the CEA, LETI is developing a unique technology where each bolometer pixel is sealed under vacuum at the wafer level, using an IR transparent thin film deposition. This technology referred to as PLP (Pixel Level Packaging), leads to an array of hermetic micro-caps each containing a single microbolometer. Since the successful demonstration that the PLP technology, when applied on a single microbolometer pixel, can provide the required vacuum < 10-3 mbar, the authors have pushed forward the development of the technology on fully operational QVGA readout circuits CMOS base wafers (320 x 240 pixels). In this outlook, the article reports on the electro optical performance obtained from this preliminary PLP based QVGA demonstrator. Apart from the response, noise and NETD distributions, the paper also puts emphasis on additional key features such as thermal time constant, image quality, and ageing properties.

  13. Simplified Methodology to Estimate the Maximum Liquid Helium (LHe) Cryostat Pressure from a Vacuum Jacket Failure

    NASA Technical Reports Server (NTRS)

    Ungar, Eugene K.; Richards, W. Lance

    2015-01-01

    The aircraft-based Stratospheric Observatory for Infrared Astronomy (SOFIA) is a platform for multiple infrared astronomical observation experiments. These experiments carry sensors cooled to liquid helium temperatures. The liquid helium supply is contained in large (i.e., 10 liters or more) vacuum-insulated dewars. Should the dewar vacuum insulation fail, the inrushing air will condense and freeze on the dewar wall, resulting in a large heat flux on the dewar's contents. The heat flux results in a rise in pressure and the actuation of the dewar pressure relief system. A previous NASA Engineering and Safety Center (NESC) assessment provided recommendations for the wall heat flux that would be expected from a loss of vacuum and detailed an appropriate method to use in calculating the maximum pressure that would occur in a loss of vacuum event. This method involved building a detailed supercritical helium compressible flow thermal/fluid model of the vent stack and exercising the model over the appropriate range of parameters. The experimenters designing science instruments for SOFIA are not experts in compressible supercritical flows and do not generally have access to the thermal/fluid modeling packages that are required to build detailed models of the vent stacks. Therefore, the SOFIA Program engaged the NESC to develop a simplified methodology to estimate the maximum pressure in a liquid helium dewar after the loss of vacuum insulation. The method would allow the university-based science instrument development teams to conservatively determine the cryostat's vent neck sizing during preliminary design of new SOFIA Science Instruments. This report details the development of the simplified method, the method itself, and the limits of its applicability. The simplified methodology provides an estimate of the dewar pressure after a loss of vacuum insulation that can be used for the initial design of the liquid helium dewar vent stacks. However, since it is not an exact

  14. Multipurpose Vacuum Induction Processing System

    NASA Astrophysics Data System (ADS)

    Govindaraju, M.; Kulkarni, Deepak; Balasubramanian, K.

    2012-11-01

    Multipurpose vacuum processing systems are cost effective; occupy less space, multiple functional under one roof and user friendly. A multipurpose vacuum induction system was designed, fabricated and installed in a record time of 6 months time at NFTDC Hyderabad. It was designed to function as a) vacuum induction melting/refining of oxygen free electronic copper/pure metals, b) vacuum induction melting furnace for ferrous materials c) vacuum induction melting for non ferrous materials d) large vacuum heat treatment chamber by resistance heating (by detachable coil and hot zone) e) bottom discharge vacuum induction melting system for non ferrous materials f) Induction heat treatment system and g) directional solidification /investment casting. It contains provision for future capacity addition. The attachments require to manufacture multiple shaped castings and continuous rod casting can be added whenever need arises. Present capacity is decided on the requirement for 10years of development path; presently it has 1.2 ton liquid copper handling capacity. It is equipped with provision for capacity addition up to 2 ton liquid copper handling capacity in future. Provision is made to carry out the capacity addition in easy steps quickly. For easy operational maintenance and troubleshooting, design was made in easily detachable sections. High vacuum system is also is detachable, independent and easily movable which is first of its kind in the country. Detailed design parameters, advantages and development history are presented in this paper.

  15. Identifying Low Cost Energy Improvements for School Buildings: An Energy Audit Manual.

    ERIC Educational Resources Information Center

    Minnesota State Dept. of Energy and Economic Development, St. Paul.

    This manual is a guide for performing energy audits in school buildings using low- and no-cost measures found effective in Minnesota. The manual helps school maintenance and administrative personnel conduct walk-through inspections of school buildings, focusing on the energy efficiency of their equipment and operations. The measures recommended…

  16. Visual Inspection Research Project Report on Benchmark Inspections

    DOT National Transportation Integrated Search

    1996-10-01

    Word document. Recognizing the importance of visual inspection in the maintenance of the civil air fleet, the FAA tasked the Aging Aircraft Nondestructive Inspection Validation Center (AANC) at Sandia National Labs in Albuquerque, NM, to establish a ...

  17. Vacuum leak detector and method

    DOEpatents

    Edwards, Jr., David

    1983-01-01

    Apparatus and method for detecting leakage in a vacuum system involves a moisture trap chamber connected to the vacuum system and to a pressure gauge. Moisture in the trap chamber is captured by freezing or by a moisture adsorbent to reduce the residual water vapor pressure therein to a negligible amount. The pressure gauge is then read to determine whether the vacuum system is leaky. By directing a stream of carbon dioxide or helium at potentially leaky parts of the vacuum system, the apparatus can be used with supplemental means to locate leaks.

  18. Robot design for a vacuum environment

    NASA Technical Reports Server (NTRS)

    Belinski, S.; Trento, W.; Imani-Shikhabadi, R.; Hackwood, S.

    1987-01-01

    The cleanliness requirements for many processing and manufacturing tasks are becoming ever stricter, resulting in a greater interest in the vacuum environment. Researchers discuss the importance of this special environment, and the development of robots which are physically and functionally suited to vacuum processing tasks. Work is in progress at the Center for robotic Systems in Microelectronics (CRSM) to provide a robot for the manufacture of a revolutionary new gyroscope in high vacuum. The need for vacuum in this and other processes is discussed as well as the requirements for a vacuum-compatible robot. Finally, researchers present details on work done at the CRSM to modify an existing clean-room compatible robot for use at high vacuum.

  19. Qualification of the RSRM field joint CF case-to-insulation bondline inspection using the Thiokol Corporation ultrasonic RSRM bondline inspection system

    NASA Technical Reports Server (NTRS)

    Cook, M.

    1990-01-01

    Qualification testing of Combustion Engineering's AMDATA Intraspect/98 Data Acquisition and Imaging System that applies to the redesigned solid rocket motor field joint capture feature case-to-insulation bondline inspection was performed. Testing was performed at M-111, the Thiokol Corp. Inert Parts Preparation Building. The purpose of the inspection was to verify the integrity of the capture feature area case-to-insulation bondline. The capture feature scanner was calibrated over an intentional 1.0 to 1.0 in. case-to-insulation unbond. The capture feature scanner was then used to scan 60 deg of a capture feature field joint. Calibration of the capture feature scanner was then rechecked over the intentional unbond to ensure that the calibration settings did not change during the case scan. This procedure was successfully performed five times to qualify the unbond detection capability of the capture feature scanner. The capture feature scanner qualified in this test contains many points of mechanical instability that can affect the overall ultrasonic signal response. A new generation scanner, designated the sigma scanner, should be implemented to replace the current configuration scanner. The sigma scanner eliminates the unstable connection points of the current scanner and has additional inspection capabilities.

  20. 24 CFR 200.937 - Supplementary specific procedural requirements under HUD building product standards and...

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... requirements under HUD building product standards and certification program for plastic bathtub units, plastic... procedural requirements under HUD building product standards and certification program for plastic bathtub... product certification program. In the case of plastic bathroom fixtures, testing and inspection shall be...

  1. Cargo container inspection test program at ARPA's Nonintrusive Inspection Technology Testbed

    NASA Astrophysics Data System (ADS)

    Volberding, Roy W.; Khan, Siraj M.

    1994-10-01

    An x-ray-based cargo inspection system test program is being conducted at the Advanced Research Project Agency (ARPA)-sponsored Nonintrusive Inspection Technology Testbed (NITT) located in the Port of Tacoma, Washington. The test program seeks to determine the performance that can be expected from a dual, high-energy x-ray cargo inspection system when inspecting ISO cargo containers. This paper describes an intensive, three-month, system test involving two independent test groups, one representing the criminal smuggling element and the other representing the law enforcement community. The first group, the `Red Team', prepares ISO containers for inspection at an off-site facility. An algorithm randomly selects and indicates the positions and preparation of cargoes within a container. The prepared container is dispatched to the NITT for inspection by the `Blue Team'. After in-gate processing, it is queued for examination. The Blue Team inspects the container and decides whether or not to pass the container. The shipment undergoes out-gate processing and returns to the Red Team. The results of the inspection are recorded for subsequent analysis. The test process, including its governing protocol, the cargoes, container preparation, the examination and results available at the time of submission are presented.

  2. Bakeout Chamber Within Vacuum Chamber

    NASA Technical Reports Server (NTRS)

    Taylor, Daniel M.; Soules, David M.; Barengoltz, Jack B.

    1995-01-01

    Vacuum-bakeout apparatus for decontaminating and measuring outgassing from pieces of equipment constructed by mounting bakeout chamber within conventional vacuum chamber. Upgrade cost effective: fabrication and installation of bakeout chamber simple, installation performed quickly and without major changes in older vacuum chamber, and provides quantitative data on outgassing from pieces of equipment placed in bakeout chamber.

  3. Optical fiber inspection system

    DOEpatents

    Moore, F.W.

    1985-04-05

    A remote optical inspection system including an inspection head. The inspection head has a passageway through which pellets or other objects are passed. A window is provided along the passageway through which light is beamed against the objects being inspected. A plurality of lens assemblies are arranged about the window so that reflected light can be gathered and transferred to a plurality of coherent optical fiber light guides. The light guides transfer the light images to a television or other image transducer which converts the optical images into a representative electronic signal. The electronic signal can then be displayed on a signal viewer such as a television monitor for inspection by a person. A staging means can be used to support the objects for viewing through the window. Routing means can be used to direct inspected objects into appropriate exit passages for accepted or rejected objects. The inspected objects are advantageously fed in a singular manner to the staging means and routing means. The inspection system is advantageously used in an enclosure when toxic or hazardous materials are being inspected. 10 figs.

  4. Optical fiber inspection system

    DOEpatents

    Moore, Francis W.

    1987-01-01

    A remote optical inspection system including an inspection head. The inspection head has a passageway through which pellets or other objects are passed. A window is provided along the passageway through which light is beamed against the objects being inspected. A plurality of lens assemblies are arranged about the window so that reflected light can be gathered and transferred to a plurality of coherent optical fiber light guides. The light guides transfer the light images to a television or other image transducer which converts the optical images into a representative electronic signal. The electronic signal can then be displayed on a signal viewer such as a television monitor for inspection by a person. A staging means can be used to support the objects for viewing through the window. Routing means can be used to direct inspected objects into appropriate exit passages for accepted or rejected objects. The inspected objects are advantageously fed in a singular manner to the staging means and routing means. The inspection system is advantageously used in an enclosure when toxic or hazardous materials are being inspected.

  5. PRA (Probabilistic Risk Assessment) Applications Program for inspection at Oconee Unit 3

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Gore, B.F.; Vo, T.V.; Harris, M.S.

    1987-10-01

    The extensive Oconee-3 PRA performed by EPRI has been analyzed to identify plant systems and components important to minimizing public risk, and to identify the primary failure modes of these components. This information has been tabulated, and correlated with inspection modules from the NRC Inspection and Enforcement Manual. The report presents a series of tables, organized by system and prioritized by public risk (in person-rem per year), which identify components associated with 98% of the inspectable risk due to plant operation. External events (earthquakes, tornadoes, fires and floods) are not addressed because inspections cannot directly minimize the risks from thesemore » events; however, flooding caused by the breach of internal systems is addressed. The systems addressed, in descending order of risk importance, are: Reactor Building Spray, R B Cooling, Condenser Circulating Water, Safety Relief Valves, Low Pressure Injection, Standby Shutdown Facility-High Pressure Injection, Low-Pressure Service Water, and Emergency Feedwater. This ranking is based on the Fussel-Vesely measure of risk importance, i.e., the fraction of the total risk which involves failures of the system of interest. 8 refs., 25 tabs.« less

  6. Construction of a Thermal Vacuum Chamber for Environment Test of Triple CubeSat Mission TRIO-CINEMA

    NASA Astrophysics Data System (ADS)

    Jeon, Jeheon; Lee, Seongwhan; Yoon, Seyoung; Seon, Jongho; Jin, Ho; Lee, Donghun; Lin, Robert P.

    2013-12-01

    TRiplet Ionospheric Observatory-CubeSat for Ion, Neutron, Electron & MAgnetic fields (TRIO-CINEMA) is a CubeSat with 3.14 kg in weight and 3-U (10 × 10 × 30 cm) in size, jointly developed by Kyung Hee University and UC Berkeley to measure magnetic fields of near Earth space and detect plasma particles. When a satellite is launched into orbit, it encounters ultrahigh vacuum and extreme temperature. To verify the operation and survivability of the satellite in such an extreme space environment, experimental tests are conducted on the ground using thermal vacuum chamber. This paper describes the temperature control device and monitoring system suitable for CubeSat test environment using the thermal vacuum chamber of the School of Space Research, Kyung Hee University. To build the chamber, we use a general purpose thermal analysis program and NX 6.0 TMG program. We carry out thermal vacuum tests on the two flight models developed by Kyung Hee University based on the thermal model of the TRIO-CINEMA satellite. It is expected from this experiment that proper operation of the satellite in the space environment will be achieved.

  7. 78 FR 54861 - Inspection, Repair, and Maintenance; Driver-Vehicle Inspection Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-06

    ... No. FMCSA-2012-0336] RIN 2126-AB46 Inspection, Repair, and Maintenance; Driver-Vehicle Inspection... Federal Register of August 7, 2013, regarding driver vehicle inspection reports. The corrections involve..., Vehicle and Roadside Operations Division, Office of Bus and Truck Standards and Operations, Federal Motor...

  8. Additive Manufacturing Infrared Inspection

    NASA Technical Reports Server (NTRS)

    Gaddy, Darrell; Nettles, Mindy

    2015-01-01

    The Additive Manufacturing Infrared Inspection Task started the development of a real-time dimensional inspection technique and digital quality record for the additive manufacturing process using infrared camera imaging and processing techniques. This project will benefit additive manufacturing by providing real-time inspection of internal geometry that is not currently possible and reduce the time and cost of additive manufactured parts with automated real-time dimensional inspections which deletes post-production inspections.

  9. A surface science compatible epifluorescence microscope for inspection of samples under ultra high vacuum and cryogenic conditions.

    PubMed

    Marquardt, Christian; Paulheim, Alexander; Rohbohm, Nils; Merkel, Rudolf; Sokolowski, Moritz

    2017-08-01

    We modified an epi-illumination light microscope and mounted it on an ultra high vacuum chamber for investigating samples used in a surface science experiment. For easy access and bake out, all optical components are placed outside the vacuum and the sample is imaged through a glass window. The microscope can be operated in reflection brightfield or epifluorescence mode to image the sample surface or fluorescent dye molecules adsorbed on it. The homemade sample mounting was made compatible for the use under the microscope; sample temperatures as low as 6 K can be achieved. The performance of the microscope is demonstrated on two model samples: Brightfield-images of a well-prepared Ag(100) surface show a macroscopic corrugation of the surface, although low energy electron diffraction data indicate a highly ordered crystalline surface. The surface shows macroscopic protrusions with flat regions, about 20-200 μm in diameter, in between. Fluorescence images of diluted 3,4,9,10-perylene tetracarboxylicacid dianhydride (PTCDA) molecules adsorbed on an ultrathin epitaxial KCl film on the Ag(100) surface show a shading effect at surface protrusions due to an inclined angle of incidence of the PTCDA beam during deposition. For some preparations, the distribution of the fluorescence intensity is inhomogeneous and shows a dense network of bright patches about 5 μm in diameter related to the macroscopic corrugation of the surface. We propose that such a light microscope can aid many surface science experiments, especially those dealing with epitaxial growth or fluorescent materials.

  10. The Potential of Sonic IR to Inspect Aircraft Components Traditionally Inspected with Fluorescent Penetrant and or Magnetic Particle Inspection

    NASA Astrophysics Data System (ADS)

    DiMambro, J.; Ashbaugh, D. M.; Han, X.; Favro, L. D.; Lu, J.; Zeng, Z.; Li, W.; Newaz, G. M.; Thomas, R. L.

    2006-03-01

    Sandia National Laboratories Airworthiness Assurance Nondestructive Inspection Validation Center (AANC) provides independent and quantitative evaluations of new and enhanced inspection, to developers, users, and regulators of aircraft. Wayne State University (WSU) has developed and patented an inspection technique using high-power ultrasonic excitation and infrared technology to detect defects in a variety of materials. AANC and WSU are working together as part of the FAA Sonic Infrared Technology Transfer Program. The ultimate goal of the program is to implement Sonic IR in the aviation field where appropriate. The capability of Sonic IR imaging to detect cracks in components commonly inspected with magnetic particle or liquid penetrant inspection in the field is of interest to industry.

  11. Introduction to the magnet and vacuum systems of an electron storage ring

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Weng, W.T.

    An accelerator or storage ring complex is a concerted interplay of various functional systems. For the convenience of discussion we can divide it into the following systems: injector, magnet, RF, vacuum, instrumentation and control. In addition, the conventional construction of the building and radiation safety consideration are also needed and finally the beam lines, detector, data acquisition and analysis set-ups for research programs. Dr. L. Teng has given a comprehensive review of the whole complex and the operation of such a facility. I concentrate on the description of magnet and vacuum systems. Only the general function of each system andmore » the basic design concepts will be introduced, no detailed engineering practice will be given which will be best done after a machine design is produced. For further understanding and references a table of bibliography is provided at the end of the paper.« less

  12. Improving Vacuum Cleaners

    NASA Technical Reports Server (NTRS)

    1997-01-01

    Under a Space Act Agreement between the Kirby company and Lewis Research Center, NASA technology was applied to a commercial vacuum cleaner product line. Kirby engineers were interested in advanced operational concepts, such as particle flow behavior and vibration, critical factors to improve vacuum cleaner performance. An evaluation of the company 1994 home care system, the Kirby G4, led to the refinement of the new G5 and future models. Under the cooperative agreement, Kirby had access to Lewis' holography equipment, which added insight into how long a vacuum cleaner fan would perform, as well as advanced computer software that can simulate the flow of air through fans. The collaboration resulted in several successes including fan blade redesign and continuing dialogue on how to improve air-flow traits in various nozzle designs.

  13. 9 CFR 381.76 - Post-mortem inspection, when required; extent; traditional, Streamlined Inspection System (SIS...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Post-mortem inspection, when required... INSPECTION REGULATIONS Post Mortem Inspection; Disposition of Carcasses and Parts § 381.76 Post-mortem...) Inspection System and the New Turkey Inspection (NTI) System; rate of inspection. (a) A post-mortem...

  14. 9 CFR 381.76 - Post-mortem inspection, when required; extent; traditional, Streamlined Inspection System (SIS...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Post-mortem inspection, when required... INSPECTION REGULATIONS Post Mortem Inspection; Disposition of Carcasses and Parts § 381.76 Post-mortem...) Inspection System and the New Turkey Inspection (NTI) System; rate of inspection. (a) A post-mortem...

  15. 9 CFR 381.76 - Post-mortem inspection, when required; extent; traditional, Streamlined Inspection System (SIS...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Post-mortem inspection, when required... INSPECTION REGULATIONS Post Mortem Inspection; Disposition of Carcasses and Parts § 381.76 Post-mortem...) Inspection System and the New Turkey Inspection (NTI) System; rate of inspection. (a) A post-mortem...

  16. 9 CFR 381.76 - Post-mortem inspection, when required; extent; traditional, Streamlined Inspection System (SIS...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Post-mortem inspection, when required... INSPECTION REGULATIONS Post Mortem Inspection; Disposition of Carcasses and Parts § 381.76 Post-mortem...) Inspection System and the New Turkey Inspection (NTI) System; rate of inspection. (a) A post-mortem...

  17. Lawful Inspections.

    ERIC Educational Resources Information Center

    Sikora, Vincent A.

    1979-01-01

    The sanitarian often spends much of his working day performing, reviewing, or supervising inspections. It is important that the sanitarian realize the legal implications of inspections and be prepared to perform them in accordance with the law. (RE)

  18. Switching Circuit for Shop Vacuum System

    NASA Technical Reports Server (NTRS)

    Burley, R. K.

    1987-01-01

    No internal connections to machine tools required. Switching circuit controls vacuum system draws debris from grinders and sanders in machine shop. Circuit automatically turns on vacuum system whenever at least one sander or grinder operating. Debris safely removed, even when operator neglects to turn on vacuum system manually. Pickup coils sense alternating magnetic fields just outside operating machines. Signal from any coil or combination of coils causes vacuum system to be turned on.

  19. Vacuum Brazing of Accelerator Components

    NASA Astrophysics Data System (ADS)

    Singh, Rajvir; Pant, K. K.; Lal, Shankar; Yadav, D. P.; Garg, S. R.; Raghuvanshi, V. K.; Mundra, G.

    2012-11-01

    Commonly used materials for accelerator components are those which are vacuum compatible and thermally conductive. Stainless steel, aluminum and copper are common among them. Stainless steel is a poor heat conductor and not very common in use where good thermal conductivity is required. Aluminum and copper and their alloys meet the above requirements and are frequently used for the above purpose. The accelerator components made of aluminum and its alloys using welding process have become a common practice now a days. It is mandatory to use copper and its other grades in RF devices required for accelerators. Beam line and Front End components of the accelerators are fabricated from stainless steel and OFHC copper. Fabrication of components made of copper using welding process is very difficult and in most of the cases it is impossible. Fabrication and joining in such cases is possible using brazing process especially under vacuum and inert gas atmosphere. Several accelerator components have been vacuum brazed for Indus projects at Raja Ramanna Centre for Advanced Technology (RRCAT), Indore using vacuum brazing facility available at RRCAT, Indore. This paper presents details regarding development of the above mentioned high value and strategic components/assemblies. It will include basics required for vacuum brazing, details of vacuum brazing facility, joint design, fixturing of the jobs, selection of filler alloys, optimization of brazing parameters so as to obtain high quality brazed joints, brief description of vacuum brazed accelerator components etc.

  20. High brightness electrodeless Z-Pinch EUV source for mask inspection tools

    NASA Astrophysics Data System (ADS)

    Horne, Stephen F.; Partlow, Matthew J.; Gustafson, Deborah S.; Besen, Matthew M.; Smith, Donald K.; Blackborow, Paul A.

    2012-03-01

    Energetiq Technology has been shipping the EQ-10 Electrodeless Z-pinchTM light source since 1995. The source is currently being used for metrology, mask inspection, and resist development. Energetiq's higher brightness source has been selected as the source for pre-production actinic mask inspection tools. This improved source enables the mask inspection tool suppliers to build prototype tools with capabilities of defect detection and review down to 16nm design rules. In this presentation we will present new source technology being developed at Energetiq to address the critical source brightness issue. The new technology will be shown to be capable of delivering brightness levels sufficient to meet the HVM requirements of AIMS and ABI and potentially API tools. The basis of the source technology is to use the stable pinch of the electrodeless light source and have a brightness of up to 100W/mm(carat)2-sr. We will explain the source design concepts, discuss the expected performance and present the modeling results for the new design.

  1. Contamination source review for Building E1489, Edgewood Area, Aberdeen Proving Ground, Maryland

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Billmark, K.A.; Hayes, D.C.; Draugelis, A.K.

    1995-09-01

    This report was prepared by Argonne National Laboratory (ANL) to document the results of a contamination source review of Building E1489 at the Aberdeen Proving Ground (APG) in Maryland. This report may be used to assist the U.S. Army-in planning for the future use or disposition of this building. The review included a historical records search, physical inspection, photographic documentation, and geophysical investigation. The field investigations were performed in 1994-1995. Building E1489 located in J-Field on the Gunpowder Peninsula in APG`s Edgewood Area housed a power generator that supplied electricity to a nearby observation tower. Building E1489 and the generatormore » were abandoned in 1974, demolished by APG personnel and removed from real estate records. A physical inspection and photographic documentation of Building E1489 were completed by ANL staff during November 1994. In 1994, ANL staff conducted geophysical surveys in the immediate vicinity of Building E1489 by using several nonintrusive methods. Survey results suggest the presence of some underground objects near Building E1489, but they do not provide conclusive evidence of the source of geophysical anomalies observed during the survey. No air monitoring was conducted at the site, and no information on underground storage tanks associated with Building E1489 was available.« less

  2. Investigation of Dielectric Breakdown Characteristics for Double-break Vacuum Interrupter and Dielectric Breakdown Probability Distribution in Vacuum Interrupter

    NASA Astrophysics Data System (ADS)

    Shioiri, Tetsu; Asari, Naoki; Sato, Junichi; Sasage, Kosuke; Yokokura, Kunio; Homma, Mitsutaka; Suzuki, Katsumi

    To investigate the reliability of equipment of vacuum insulation, a study was carried out to clarify breakdown probability distributions in vacuum gap. Further, a double-break vacuum circuit breaker was investigated for breakdown probability distribution. The test results show that the breakdown probability distribution of the vacuum gap can be represented by a Weibull distribution using a location parameter, which shows the voltage that permits a zero breakdown probability. The location parameter obtained from Weibull plot depends on electrode area. The shape parameter obtained from Weibull plot of vacuum gap was 10∼14, and is constant irrespective non-uniform field factor. The breakdown probability distribution after no-load switching can be represented by Weibull distribution using a location parameter. The shape parameter after no-load switching was 6∼8.5, and is constant, irrespective of gap length. This indicates that the scatter of breakdown voltage was increased by no-load switching. If the vacuum circuit breaker uses a double break, breakdown probability at low voltage becomes lower than single-break probability. Although potential distribution is a concern in the double-break vacuum cuicuit breaker, its insulation reliability is better than that of the single-break vacuum interrupter even if the bias of the vacuum interrupter's sharing voltage is taken into account.

  3. Vacuum-insulated catalytic converter

    DOEpatents

    Benson, David K.

    2001-01-01

    A catalytic converter has an inner canister that contains catalyst-coated substrates and an outer canister that encloses an annular, variable vacuum insulation chamber surrounding the inner canister. An annular tank containing phase-change material for heat storage and release is positioned in the variable vacuum insulation chamber a distance spaced part from the inner canister. A reversible hydrogen getter in the variable vacuum insulation chamber, preferably on a surface of the heat storage tank, releases hydrogen into the variable vacuum insulation chamber to conduct heat when the phase-change material is hot and absorbs the hydrogen to limit heat transfer to radiation when the phase-change material is cool. A porous zeolite trap in the inner canister absorbs and retains hydrocarbons from the exhaust gases when the catalyst-coated substrates and zeolite trap are cold and releases the hydrocarbons for reaction on the catalyst-coated substrate when the zeolite trap and catalyst-coated substrate get hot.

  4. Vacuum-Induction, Vacuum-Arc, and Air-Induction Melting of a Complex Heat-Resistant Alloy

    NASA Technical Reports Server (NTRS)

    Decker, R. F.; Rowe, John P.; Freeman, J. W.

    1959-01-01

    The relative hot-workability and creep-rupture properties at 1600 F of a complex 55Ni-20Cr-15Co-4Mo-3Ti-3Al alloy were evaluated for vacuum-induction, vacuum-arc, and air-induction melting. A limited study of the role of oxygen and nitrogen and the structural effects in the alloy associated with the melting process was carried out. The results showed that the level of boron and/or zirconium was far more influential on properties than the melting method. Vacuum melting did reduce corner cracking and improve surface during hot-rolling. It also resulted in more uniform properties within heats. The creep-rupture properties were slightly superior in vacuum heats at low boron plus zirconium or in heats with zirconium. There was little advantage at high boron levels and air heats were superior at high levels of boron plus zirconium. Vacuum heats also had fewer oxide and carbonitride inclusions although this was a function of the opportunity for separation of the inclusions from high oxygen plus nitrogen heats. The removal of phosphorous by vacuum melting was not found to be related to properties. Oxygen plus nitrogen appeared to increase ductility in creep-rupture tests suggesting that vacuum melting removes unidentified elements detrimental to ductility. Oxides and carbonitrides in themselves did not initiate microcracks. Carbonitrides in the grain boundaries of air heats did initiate microcracks. The role of microcracking from this source and as a function of oxygen and nitrogen content was not clear. Oxygen and nitrogen did intensify corner cracking during hot-rolling but were not responsible for poor surface which resulted from rolling heats melted in air.

  5. Nuclear Technology. Course 28: Welding Inspection. Module 28-7, Acceptance Inspection.

    ERIC Educational Resources Information Center

    Espy, John; Selleck, Ben

    This seventh in a series of ten modules for a course titled Welding Inspection describes how to determine what inspection is required for a given weld, when the inspection should be performed, and what acceptance standards apply. The module follows a typical format that includes the following sections: (1) introduction, (2) module prerequisites,…

  6. Software Formal Inspections Standard

    NASA Technical Reports Server (NTRS)

    1993-01-01

    This Software Formal Inspections Standard (hereinafter referred to as Standard) is applicable to NASA software. This Standard defines the requirements that shall be fulfilled by the software formal inspections process whenever this process is specified for NASA software. The objective of this Standard is to define the requirements for a process that inspects software products to detect and eliminate defects as early as possible in the software life cycle. The process also provides for the collection and analysis of inspection data to improve the inspection process as well as the quality of the software.

  7. Wireless Integrated Microelectronic Vacuum Sensor System

    NASA Technical Reports Server (NTRS)

    Krug, Eric; Philpot, Brian; Trott, Aaron; Lawrence, Shaun

    2013-01-01

    NASA Stennis Space Center's (SSC's) large rocket engine test facility requires the use of liquid propellants, including the use of cryogenic fluids like liquid hydrogen as fuel, and liquid oxygen as an oxidizer (gases which have been liquefied at very low temperatures). These fluids require special handling, storage, and transfer technology. The biggest problem associated with transferring cryogenic liquids is product loss due to heat transfer. Vacuum jacketed piping is specifically designed to maintain high thermal efficiency so that cryogenic liquids can be transferred with minimal heat transfer. A vacuum jacketed pipe is essentially two pipes in one. There is an inner carrier pipe, in which the cryogenic liquid is actually transferred, and an outer jacket pipe that supports and seals the vacuum insulation, forming the "vacuum jacket." The integrity of the vacuum jacketed transmission lines that transfer the cryogenic fluid from delivery barges to the test stand must be maintained prior to and during engine testing. To monitor the vacuum in these vacuum jacketed transmission lines, vacuum gauge readings are used. At SSC, vacuum gauge measurements are done on a manual rotation basis with two technicians, each using a handheld instrument. Manual collection of vacuum data is labor intensive and uses valuable personnel time. Additionally, there are times when personnel cannot collect the data in a timely fashion (i.e., when a leak is detected, measurements must be taken more often). Additionally, distribution of this data to all interested parties can be cumbersome. To simplify the vacuum-gauge data collection process, automate the data collection, and decrease the labor costs associated with acquiring these measurements, an automated system that monitors the existing gauges was developed by Invocon, Inc. For this project, Invocon developed a Wireless Integrated Microelectronic Vacuum Sensor System (WIMVSS) that provides the ability to gather vacuum

  8. Development of X-ray computed tomography inspection facility for the H-II solid rocket boosters

    NASA Astrophysics Data System (ADS)

    Sasaki, M.; Fujita, T.; Fukushima, Y.; Shimizu, M.; Itoh, S.; Satoh, A.; Miyamoto, H.

    The National Space Development Agency of Japan (NASDA) initiated the development of an X-ray computed tomography (CT) equipment for the H-II solid rocket boosters (SRBs) in 1987 for the purpose of minimizing inspection time and achieving high cost-effectiveness. The CT facility has been completed in Jan. 1991 in Tanegashima Space Center for the inspection of the SRBs transported from the manufacturer's factory to the launch site. It was first applied to the qualification model SRB from Feb. to Apr. in 1991. Through the CT inspection of the SRB, it has been confirmed that inspection time decreased significantly compared with the X-ray radiography method and that even an unskilled inspector could find various defects. As a result, the establishment of a new reliable inspection method for the SRB has been verified. In this paper, the following are discussed: (1) the defect detectability of the CT equipment using a dummy SRB with various artificial defects, (2) the performance comparison between the CT method and the X-ray radiography method, (3) the reliability of the CT equipment, and (4) the radiation shield design of the nondestructive test building.

  9. Running vacuum cosmological models: linear scalar perturbations

    NASA Astrophysics Data System (ADS)

    Perico, E. L. D.; Tamayo, D. A.

    2017-08-01

    In cosmology, phenomenologically motivated expressions for running vacuum are commonly parameterized as linear functions typically denoted by Λ(H2) or Λ(R). Such models assume an equation of state for the vacuum given by bar PΛ = - bar rhoΛ, relating its background pressure bar PΛ with its mean energy density bar rhoΛ ≡ Λ/8πG. This equation of state suggests that the vacuum dynamics is due to an interaction with the matter content of the universe. Most of the approaches studying the observational impact of these models only consider the interaction between the vacuum and the transient dominant matter component of the universe. We extend such models by assuming that the running vacuum is the sum of independent contributions, namely bar rhoΛ = Σibar rhoΛi. Each Λ i vacuum component is associated and interacting with one of the i matter components in both the background and perturbation levels. We derive the evolution equations for the linear scalar vacuum and matter perturbations in those two scenarios, and identify the running vacuum imprints on the cosmic microwave background anisotropies as well as on the matter power spectrum. In the Λ(H2) scenario the vacuum is coupled with every matter component, whereas the Λ(R) description only leads to a coupling between vacuum and non-relativistic matter, producing different effects on the matter power spectrum.

  10. 9 CFR 592.650 - Inspection.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Inspection. 592.650 Section 592.650 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Sanitary and Processing Requirements § 592.650 Inspection. Examinations of the ingredients,...

  11. 9 CFR 592.650 - Inspection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Inspection. 592.650 Section 592.650 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Sanitary and Processing Requirements § 592.650 Inspection. Examinations of the ingredients,...

  12. 9 CFR 592.650 - Inspection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Inspection. 592.650 Section 592.650 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Sanitary and Processing Requirements § 592.650 Inspection. Examinations of the ingredients,...

  13. 9 CFR 592.650 - Inspection.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Inspection. 592.650 Section 592.650 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Sanitary and Processing Requirements § 592.650 Inspection. Examinations of the ingredients,...

  14. 14 CFR 29.1433 - Vacuum systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Miscellaneous Equipment § 29.1433 Vacuum systems. (a... the discharge lines from the vacuum air pump when the delivery temperature of the air becomes unsafe. (b) Each vacuum air system line and fitting on the discharge side of the pump that might contain...

  15. Vacuum Technology Considerations For Mass Metrology

    PubMed Central

    Abbott, Patrick J.; Jabour, Zeina J.

    2011-01-01

    Vacuum weighing of mass artifacts eliminates the necessity of air buoyancy correction and its contribution to the measurement uncertainty. Vacuum weighing is also an important process in the experiments currently underway for the redefinition of the SI mass unit, the kilogram. Creating the optimum vacuum environment for mass metrology requires careful design and selection of construction materials, plumbing components, pumping, and pressure gauging technologies. We review the vacuum technology1 required for mass metrology and suggest procedures and hardware for successful and reproducible operation. PMID:26989593

  16. Aspects of the Health Inspection Authority in the People's Republic of China.

    PubMed

    Ma, Sha; Chen, Gang; Tan, B-K

    2015-05-20

    In China, there was a pressing need to establish a governmental agency to oversee the organizations that provide public health and medical services. The Chinese Health Inspection Authority (HIA), a relatively independent organization functioning at each administrative level (provincial, municipal, and county), was mandated to conduct 11 health inspection functions to maintain efficient public health and medical services. These functions include issuing health permit, conducting health supervision and inspection, health testing and evaluation, case investigation, complaint handling, managing public health crisis, monitoring and safeguarding public health at major public events, enforcing supervision and inspection compliance, public health education, information management, and team training and management. Since the reform of the health inspection system by the Ministry of Health in 2000, the HIA underwent a series of changes and transitions. This study aimed to describe and assess the five factors that were considered to be important for meeting service delivery objectives of the HIA in the People's Republic of China. A total of 604 HIAs, sampled across three geographical regions of China at three administrative levels, participated in a cross-sectional survey conducted in 2013. Descriptive statistics were used to analyze the status of mandated operations, manpower, revenue and expenditures, and institutional infrastructure. Differences in these characteristics across the geographical regions and administrative levels were compared. On average, the HIAs had not fully implemented the 11 mandated functions at any administrative levels. Governmental financial allocations were the main sources of revenue. Three primary personnel employment models coexisted and most employed the quasi-civil service employment model. The institutional infrastructure did not meet governmental mandated standards with respect to building area or the number and types of equipment available

  17. Gas propagation in a liquid helium cooled vacuum tube following a sudden vacuum loss

    NASA Astrophysics Data System (ADS)

    Dhuley, Ram C.

    This dissertation describes the propagation of near atmospheric nitrogen gas that rushes into a liquid helium cooled vacuum tube after the tube suddenly loses vacuum. The loss-of-vacuum scenario resembles accidental venting of atmospheric air to the beam-line of a superconducting radio frequency particle accelerator and is investigated to understand how in the presence of condensation, the in-flowing air will propagate in such geometry. In a series of controlled experiments, room temperature nitrogen gas (a substitute for air) at a variety of mass flow rates was vented to a high vacuum tube immersed in a bath of liquid helium. Pressure probes and thermometers installed on the tube along its length measured respectively the tube pressure and tube wall temperature rise due to gas flooding and condensation. At high mass in-flow rates a gas front propagated down the vacuum tube but with a continuously decreasing speed. Regression analysis of the measured front arrival times indicates that the speed decreases nearly exponentially with the travel length. At low enough mass in-flow rates, no front propagated in the vacuum tube. Instead, the in-flowing gas steadily condensed over a short section of the tube near its entrance and the front appeared to `freeze-out'. An analytical expression is derived for gas front propagation speed in a vacuum tube in the presence of condensation. The analytical model qualitatively explains the front deceleration and flow freeze-out. The model is then simplified and supplemented with condensation heat/mass transfer data to again find the front to decelerate exponentially while going away from the tube entrance. Within the experimental and procedural uncertainty, the exponential decay length-scales obtained from the front arrival time regression and from the simplified model agree.

  18. Developing a vacuum cooking equipment prototype to produce strawberry jam and optimization of vacuum cooking conditions.

    PubMed

    Okut, Dilara; Devseren, Esra; Koç, Mehmet; Ocak, Özgül Özdestan; Karataş, Haluk; Kaymak-Ertekin, Figen

    2018-01-01

    Purpose of this study was to develop prototype cooking equipment that can work at reduced pressure and to evaluate its performance for production of strawberry jam. The effect of vacuum cooking conditions on color soluble solid content, reducing sugars total sugars HMF and sensory properties were investigated. Also, the optimum vacuum cooking conditions for strawberry jam were optimized for Composite Rotatable Design. The optimum cooking temperature and time were determined targeting maximum soluble solid content and sensory attributes (consistency) and minimum Hue value and HMF content. The optimum vacuum cooking conditions determined were 74.4 °C temperature and 19.8 time. The soluble solid content strawberry jam made by vacuum process were similar to those prepared by traditional method. HMF contents of jams produced with vacuum cooking method were well within limit of standards.

  19. 14 CFR 29.1433 - Vacuum systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Vacuum systems. 29.1433 Section 29.1433... STANDARDS: TRANSPORT CATEGORY ROTORCRAFT Equipment Miscellaneous Equipment § 29.1433 Vacuum systems. (a.... (b) Each vacuum air system line and fitting on the discharge side of the pump that might contain...

  20. Research and Development on the Storage Ring Vacuum System for the APS Upgrade Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stillwell, B.; Brajuskovic, B.; Carter, J.

    A number of research and development activities are underway at Argonne National Laboratory to build confidence in the designs for the storage ring vacuum system required for the Advanced Photon Source Up-grade project (APS-U) [1]. The predominant technical risks are: excessive residual gas pressures during operation; insufficient beam position monitor stability; excessive beam impedance; excessive heating by induced electrical surface currents; and insufficient operational reliability. Present efforts to mitigate these risks include: building and evaluating mockup assemblies; performing mechanical testing of chamber weld joints; developing computational tools; investigating design alternatives; and performing electrical bench measurements. Status of these activities andmore » some of what has been learned to date will be shared.« less

  1. Optical inspection of NGL masks

    NASA Astrophysics Data System (ADS)

    Pettibone, Donald W.; Stokowski, Stanley E.

    2004-12-01

    For the last five years KLA-Tencor and our joint venture partners have pursued a research program studying the ability of optical inspection tools to meet the inspection needs of possible NGL lithographies. The NGL technologies that we have studied include SCALPEL, PREVAIL, EUV lithography, and Step and Flash Imprint Lithography. We will discuss the sensitivity of the inspection tools and mask design factors that affect tool sensitivity. Most of the work has been directed towards EUV mask inspection and how to optimize the mask to facilitate inspection. Our partners have succeeded in making high contrast EUV masks ranging in contrast from 70% to 98%. Die to die and die to database inspection of EUV masks have been achieved with a sensitivity that is comparable to what can be achieved with conventional photomasks, approximately 80nm defect sensitivity. We have inspected SCALPEL masks successfully. We have found a limitation of optical inspection when applied to PREVAIL stencil masks. We have run inspections on SFIL masks in die to die, reflected light, in an effort to provide feedback to improve the masks. We have used a UV inspection system to inspect both unpatterned EUV substrates (no coatings) and blanks (with EUV multilayer coatings). These inspection results have proven useful in driving down the substrate and blank defect levels.

  2. Vacuum status-display and sector-conditioning programs

    NASA Astrophysics Data System (ADS)

    Skelly, J.; Yen, S.

    1990-08-01

    Two programs have been developed for observation and control of the AGS vacuum system, which include the following notable features: (1) they incorporate a graphical user interface and (2) they are driven by a relational database which describes the vacuum system. The vacuum system comprises some 440 devices organized into 28 vacuum sectors. The status-display program invites menu selection of a sector, interrogates the relational database for relevant vacuum devices, acquires live readbacks and posts a graphical display of their status. The sector-conditioning program likewise invites sector selection, produces the same status display and also implements process control logic on the sector devices to pump the sector down from atmospheric pressure to high vacuum over a period extending several hours. As additional devices are installed in the vacuum system, the devices are added to the relational database; these programs then automatically include the new devices.

  3. Working in a Vacuum

    ERIC Educational Resources Information Center

    Rathey, Allen

    2005-01-01

    In this article, the author discusses several myths about vacuum cleaners and offers tips on evaluating and purchasing this essential maintenance tool. These myths are: (1) Amps mean performance; (2) Everyone needs high-efficiency particulate air (HEPA): (3) Picking up a "bowling ball" shows cleaning power; (4) All vacuum bags are the same; (5)…

  4. Studies of Niobium Thin Film Produced by Energetic Vacuum Deposition

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Genfa Wu; Anne-Marie Valente; H. Phillips

    2004-05-01

    An energetic vacuum deposition system has been used to study deposition energy effects on the properties of niobium thin films on copper and sapphire substrates. The absence of working gas avoids the gaseous inclusions commonly seen with sputtering deposition. A biased substrate holder controls the deposition energy. Transition temperature and residual resistivity ratio of the niobium thin films at several deposition energies are obtained together with surface morphology and crystal orientation measurements by AFM inspection, XRD and TEM analysis. The results show that niobium thin films on sapphire substrate exhibit the best cryogenic properties at deposition energy around 123 eV.more » The TEM analysis revealed that epitaxial growth of film was evident when deposition energy reaches 163 eV for sapphire substrate. Similarly, niobium thin film on copper substrate shows that film grows more oriented with higher deposition energy and grain size reaches the scale of the film thickness at the deposition energy around 153 eV.« less

  5. Nonperturbative vacuum polarization effects in two-dimensional supercritical Dirac-Coulomb system I. Vacuum charge density

    NASA Astrophysics Data System (ADS)

    Davydov, A.; Sveshnikov, K.; Voronina, Yu.

    2018-01-01

    Based on the original combination of analytical methods, computer algebra tools and numerical calculations, proposed recently in Refs. 1-3, the nonperturbative vacuum polarization effects in the 2+1D supercritical Dirac-Coulomb system with Z > Zcr,1 are explored. Both the vacuum charge density ρV P(r→) and vacuum energy ℰV P are considered. The main result of the work is that in the overcritical region ℰV P turns out to be a rapidly decreasing function ˜-ηeffZ3/R with ηeff > 0 and R being the size of the external Coulomb source. Due to a lot of details of calculation the whole work is divided into two parts I and II. In the present part I, we consider the evaluation and behavior of the vacuum density ρV P, which further is used in part II for evaluation of the vacuum energy, with emphasis on the renormalization, convergence of the partial expansion for ρV P and behavior of the integral induced charge QV P in the overcritical region.

  6. SAFER vehicle inspection: a multimodal robotic sensing platform

    NASA Astrophysics Data System (ADS)

    Page, David L.; Fougerolle, Yohan; Koschan, Andreas F.; Gribok, Andrei; Abidi, Mongi A.; Gorsich, David J.; Gerhart, Grant R.

    2004-09-01

    The current threats to U.S. security both military and civilian have led to an increased interest in the development of technologies to safeguard national facilities such as military bases, federal buildings, nuclear power plants, and national laboratories. As a result, the Imaging, Robotics, and Intelligent Systems (IRIS) Laboratory at The University of Tennessee (UT) has established a research consortium, known as SAFER (Security Automation and Future Electromotive Robotics), to develop, test, and deploy sensing and imaging systems for unmanned ground vehicles (UGV). The targeted missions for these UGV systems include -- but are not limited to --under vehicle threat assessment, stand-off check-point inspections, scout surveillance, intruder detection, obstacle-breach situations, and render-safe scenarios. This paper presents a general overview of the SAFER project. Beyond this general overview, we further focus on a specific problem where we collect 3D range scans of under vehicle carriages. These scans require appropriate segmentation and representation algorithms to facilitate the vehicle inspection process. We discuss the theory for these algorithms and present results from applying them to actual vehicle scans.

  7. 7 CFR 319.37-4 - Inspection, treatment, and phytosanitary certificates of inspection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 5 2011-01-01 2011-01-01 false Inspection, treatment, and phytosanitary certificates of inspection. 319.37-4 Section 319.37-4 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOREIGN QUARANTINE NOTICES Nursery Stock, Plants, Roots, Bulbs, Seeds...

  8. 7 CFR 319.37-4 - Inspection, treatment, and phytosanitary certificates of inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Inspection, treatment, and phytosanitary certificates of inspection. 319.37-4 Section 319.37-4 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE FOREIGN QUARANTINE NOTICES Nursery Stock, Plants, Roots, Bulbs, Seeds...

  9. Practical identification of moisture sources in building assemblies using infrared thermography

    NASA Astrophysics Data System (ADS)

    McIntosh, Gregory B.; Colantonio, Antonio

    2015-05-01

    Water, in its various phases, in any environment other than desert (hot or cold) conditions, is the single most destructive element that causes deterioration of materials and failure of building assemblies. It is the key element present in the formation of mold and fungi that lead to indoor air quality problems. Water is the primary element that needs to be managed in buildings to ensure human comfort, health and safety. Under the right thermodynamic conditions the detection of moisture in its various states is possible through the use of infrared thermography for a large variety of building assemblies and materials. The difficulty is that moisture is transient and mobile from one environment to another via air movement, vapor pressure or phase change. Building materials and enclosures provide both repositories and barriers to this moisture movement. In real life steady state conditions do not exist for moisture within building materials and enclosures. Thus the detection of moisture is in a constant state of transition. Sometimes you will see it and sometimes you will not. Understanding the limitations at the time of inspection will go a long way to mitigating unsatisfied clients or difficult litigation. Moisture detection can be observed by IRT via three physical mechanisms; latent heat absorption or release during phase change; a change in conductive heat transfer; and a change in thermal capacitance. Complicating the three methodologies is the factor of variable temperature differentials and variable mass air flow on, through and around surfaces being inspected. Building enclosures come in variable assembly types and are designed to perform differently in different environmental regions. Sources for moisture accumulation will vary for different environmental conditions. Detection methodologies will change for each assembly type in different ambient environments. This paper will look at the issue of the methodologies for detection of the presence of moisture and

  10. Nonperturbative vacuum polarization effects in two-dimensional supercritical Dirac-Coulomb system II. Vacuum energy

    NASA Astrophysics Data System (ADS)

    Davydov, A.; Sveshnikov, K.; Voronina, Yu.

    2018-01-01

    Nonperturbative vacuum polarization effects are explored for a supercritical Dirac-Coulomb system with Z > Zcr,1 in 2+1D, based on the original combination of analytical methods, computer algebra and numerical calculations, proposed recently in Refs. 1-3. Both the vacuum charge density ρV P(r→) and vacuum energy ℰV P are considered. Due to a lot of details of calculation the whole work is divided into two parts I and II. Taking account of results, obtained in the part I4 for ρV P, in the present part II, the evaluation of the vacuum energy ℰV P is investigated with emphasis on the renormalization and convergence of the partial expansion for ℰV P. It is shown that the renormalization via fermionic loop turns out to be the universal tool, which removes the divergence of the theory both in the purely perturbative and essentially nonperturbative regimes of the vacuum polarization. The main result of calculation is that for a wide range of the system parameters in the overcritical region ℰV P turns out to be a rapidly decreasing function ˜-ηeffZ3/R with ηeff > 0 and R being the size of the external Coulomb source. To the end the similarity in calculations of ℰV P in 2+1 and 3+1D is discussed, and qualitative arguments are presented in favor of the possibility for complete screening of the classical electrostatic energy of the Coulomb source by the vacuum polarization effects for Z ≫ Zcr,1 in 3+1D.

  11. Quantum vacuum noise in physics and cosmology.

    PubMed

    Davies, P. C. W.

    2001-09-01

    The concept of the vacuum in quantum field theory is a subtle one. Vacuum states have a rich and complex set of properties that produce distinctive, though usually exceedingly small, physical effects. Quantum vacuum noise is familiar in optical and electronic devices, but in this paper I wish to consider extending the discussion to systems in which gravitation, or large accelerations, are important. This leads to the prediction of vacuum friction: The quantum vacuum can act in a manner reminiscent of a viscous fluid. One result is that rapidly changing gravitational fields can create particles from the vacuum, and in turn the backreaction on the gravitational dynamics operates like a damping force. I consider such effects in early universe cosmology and the theory of quantum black holes, including the possibility that the large-scale structure of the universe might be produced by quantum vacuum noise in an early inflationary phase. I also discuss the curious phenomenon that an observer who accelerates through a quantum vacuum perceives a bath of thermal radiation closely analogous to Hawking radiation from black holes, even though an inertial observer registers no particles. The effects predicted raise very deep and unresolved issues about the nature of quantum particles, the role of the observer, and the relationship between the quantum vacuum and the concepts of information and entropy. (c) 2001 American Institute of Physics.

  12. Running vacuum cosmological models: linear scalar perturbations

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Perico, E.L.D.; Tamayo, D.A., E-mail: elduartep@usp.br, E-mail: tamayo@if.usp.br

    In cosmology, phenomenologically motivated expressions for running vacuum are commonly parameterized as linear functions typically denoted by Λ( H {sup 2}) or Λ( R ). Such models assume an equation of state for the vacuum given by P-bar {sub Λ} = - ρ-bar {sub Λ}, relating its background pressure P-bar {sub Λ} with its mean energy density ρ-bar {sub Λ} ≡ Λ/8π G . This equation of state suggests that the vacuum dynamics is due to an interaction with the matter content of the universe. Most of the approaches studying the observational impact of these models only consider the interactionmore » between the vacuum and the transient dominant matter component of the universe. We extend such models by assuming that the running vacuum is the sum of independent contributions, namely ρ-bar {sub Λ} = Σ {sub i} ρ-bar {sub Λ} {sub i} . Each Λ i vacuum component is associated and interacting with one of the i matter components in both the background and perturbation levels. We derive the evolution equations for the linear scalar vacuum and matter perturbations in those two scenarios, and identify the running vacuum imprints on the cosmic microwave background anisotropies as well as on the matter power spectrum. In the Λ( H {sup 2}) scenario the vacuum is coupled with every matter component, whereas the Λ( R ) description only leads to a coupling between vacuum and non-relativistic matter, producing different effects on the matter power spectrum.« less

  13. Crew Systems Laboratory/Building 7. Historical Documentation

    NASA Technical Reports Server (NTRS)

    Slovinac, Patricia

    2011-01-01

    Building 7 is managed by the Crew and Thermal Systems Division of the JSC Engineering Directorate. Originally named the Life Systems Laboratory, it contained five major test facilities: two advanced environmental control laboratories and three human-rated vacuum chambers (8 , 11 , and the 20 ). These facilities supported flight crew familiarization and the testing and evaluation of hardware used in the early manned spaceflight programs, including Gemini, Apollo, and the ASTP.

  14. Vacuum phonon tunneling.

    PubMed

    Altfeder, Igor; Voevodin, Andrey A; Roy, Ajit K

    2010-10-15

    Field-induced phonon tunneling, a previously unknown mechanism of interfacial thermal transport, has been revealed by ultrahigh vacuum inelastic scanning tunneling microscopy (STM). Using thermally broadened Fermi-Dirac distribution in the STM tip as in situ atomic-scale thermometer we found that thermal vibrations of the last tip atom are effectively transmitted to sample surface despite few angstroms wide vacuum gap. We show that phonon tunneling is driven by interfacial electric field and thermally vibrating image charges, and its rate is enhanced by surface electron-phonon interaction.

  15. 21 CFR 884.4340 - Fetal vacuum extractor.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... means of a suction cup attached to the scalp and is powered by an external vacuum source. This generic type of device may include the cup, hosing, vacuum source, and vacuum control. (b) Classification...

  16. 21 CFR 884.4340 - Fetal vacuum extractor.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... means of a suction cup attached to the scalp and is powered by an external vacuum source. This generic type of device may include the cup, hosing, vacuum source, and vacuum control. (b) Classification...

  17. Cold cathode vacuum gauging system

    DOEpatents

    Denny, Edward C.

    2004-03-09

    A vacuum gauging system of the cold cathode type is provided for measuring the pressure of a plurality of separate vacuum systems, such as in a gas centrifuge cascade. Each casing is fitted with a gauge tube assembly which communicates with the vacuum system in the centrifuge casing. Each gauge tube contains an anode which may be in the form of a slender rod or wire hoop and a cathode which may be formed by the wall of the gauge tube. The tube is provided with an insulated high voltage connector to the anode which has a terminal for external connection outside the vacuum casing. The tube extends from the casing so that a portable magnet assembly may be inserted about the tube to provide a magnetic field in the area between the anode and cathode necessary for pressure measurements in a cold cathode-type vacuum gauge arrangement. The portable magnetic assembly is provided with a connector which engages the external high voltage terminal for providing power to the anode within in the gauge tube. Measurement is made in the same manner as the prior cold cathode gauges in that the current through the anode to the cathode is measured as an indication of the pressure. By providing the portable magnetic assembly, a considerable savings in cost, installation, and maintenance of vacuum gauges for pressure measurement in a gas centrifuge cascade is realizable.

  18. Measurement of partial pressures in vacuum technology and vacuum physics

    NASA Technical Reports Server (NTRS)

    Huber, W. K.

    1986-01-01

    It is pointed out that the measurement of gaseous pressures of less than 0.0001 torr is based on the ionization of gas atoms and molecules due to collisions with electrons. The particle density is determined in place of the pressure. The ionization cross sections for molecules of various gases are discussed. It is found that the true pressure in a vacuum system cannot be determined with certainty if it is unknown which gas is present. Effects of partial pressure determination on the condition of the vacuum system are discussed together with ion sources, systems of separation, and ion detection.

  19. VACUUM TRAP AND VALVE COMBINATION

    DOEpatents

    Milleron, N.; Levenson, L.

    1963-02-19

    This patent relates to a vacuum trap and valve combination suitable for use in large ultra-high vacuum systems. The vacuum trap is a chamber having an inlet and outlet opening which may be made to communicate with a chamber to be evacuated and a diffusion pump, respectively. A valve is designed to hermeticaliy seal with inlet opening and, when opened, block the line-of- sight'' between the inlet and outlet openings, while allowing a large flow path between the opened vaive and the side walls of the trap. The interior of the trap and the side of the valve facing the inlet opening are covered with an impurity absorbent, such as Zeolite or activated aluminum. Besides the advantage of combining two components of a vacuum system into one, the present invention removes the need for a baffle between the pump and the chamber to be evacuated. In one use of a specific embodiment of this invention, the transmission probability was 45 and the partial pressure of the pump fluid vapor in the vacuum chamber was at least 100 times lower than its vapor pressure. (AEC)

  20. 7 CFR 353.6 - Inspection.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 5 2012-01-01 2012-01-01 false Inspection. 353.6 Section 353.6 Agriculture Regulations of the Department of Agriculture (Continued) ANIMAL AND PLANT HEALTH INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EXPORT CERTIFICATION § 353.6 Inspection. Inspections shall be performed by agents...

  1. [An analysis of eligibility for occupational health inspection agencies in eight provinces of China].

    PubMed

    Qi, Fang; Wang, Huanqiang; Li, Tao; Lyu, Xiangpei; Zhu, Qiuhong; Yu, Chen

    2015-06-01

    health inspection network has been established in these surveyed regions. CDCs, institutes for occupational disease prevention and control, and hospitals are the main agencies for occupational health inspection. In order to build up a network of occupational disease prevention and control, various agencies should make full use of their own advantages and enhance abilities and technical cooperation.

  2. First Evidence of Running Cosmic Vacuum: Challenging the Concordance Model

    NASA Astrophysics Data System (ADS)

    Solà, Joan; Gómez-Valent, Adrià; de Cruz Pérez, Javier

    2017-02-01

    Despite the fact that a rigid {{Λ }}-term is a fundamental building block of the concordance ΛCDM model, we show that a large class of cosmological scenarios with dynamical vacuum energy density {ρ }{{Λ }} together with a dynamical gravitational coupling G or a possible non-conservation of matter, are capable of seriously challenging the traditional phenomenological success of the ΛCDM. In this paper, we discuss these “running vacuum models” (RVMs), in which {ρ }{{Λ }}={ρ }{{Λ }}(H) consists of a nonvanishing constant term and a series of powers of the Hubble rate. Such generic structure is potentially linked to the quantum field theoretical description of the expanding universe. By performing an overall fit to the cosmological observables SN Ia+BAO+H(z)+LSS+BBN+CMB (in which the WMAP9, Planck 2013, and Planck 2015 data are taken into account), we find that the class of RVMs appears significantly more favored than the ΛCDM, namely, at an unprecedented level of ≳ 4.2σ . Furthermore, the Akaike and Bayesian information criteria confirm that the dynamical RVMs are strongly preferred compared to the conventional rigid {{Λ }}-picture of the cosmic evolution.

  3. Vacuum enhanced cutaneous biopsy instrument

    DOEpatents

    Collins, Joseph

    2000-01-01

    A syringe-like disposable cutaneous biopsy instrument equipped with a tubular blade at its lower end, and designed so that a vacuum is created during use, said vacuum serving to retain undeformed a plug of tissue cut from a patient's skin.

  4. Troubleshooting crude vacuum tower overhead ejector systems

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lines, J.R.; Frens, L.L.

    1995-03-01

    Routinely surveying tower overhead vacuum systems can improve performance and product quality. These vacuum systems normally provide reliable and consistent operation. However, process conditions, supplied utilities, corrosion, erosion and fouling all have an impact on ejector system performance. Refinery vacuum distillation towers use ejector systems to maintain tower top pressure and remove overhead gases. However, as with virtually all refinery equipment, performance may be affected by a number of variables. These variables may act independently or concurrently. It is important to understand basic operating principles of vacuum systems and how performance is affected by: utilities, corrosion and erosion, fouling, andmore » process conditions. Reputable vacuum-system suppliers have service engineers that will come to a refinery to survey the system and troubleshoot performance or offer suggestions for improvement. A skilled vacuum-system engineer may be needed to diagnose and remedy system problems. The affect of these variables on performance is discussed. A case history is described of a vacuum system on a crude tower in a South American refinery.« less

  5. Pegasus ICON Starboard Black Light Inspection

    NASA Image and Video Library

    2018-05-22

    A technician performs a black light inspection of the Orbital ATK Pegasus starboard on May 22, 2018, prior to fully mating NASA's Ionospheric Connection Explorer (ICON) to Pegasus inside Building 1555 at Vandenberg Air Force Base in California. The explorer will launch on June 15, 2018, from Kwajalein Atoll in the Marshall Islands (June 14 in the continental United States) on the Pegasus XL, which is attached to the company's L-1011 Stargazer aircraft. ICON will study the frontier of space - the dynamic zone high in Earth's atmosphere where terrestrial weather from below meets space weather above. The explorer will help determine the physics of Earth's space environment and pave the way for mitigating its effects on our technology and communications systems.

  6. Pegasus ICON Starboard Black Light Inspection

    NASA Image and Video Library

    2018-05-22

    A technician begins a black light inspection of the Orbital ATK Pegasus starboard on May 22, 2018, prior to mating NASA's Ionospheric Connection Explorer (ICON) to Pegasus inside Building 1555 at Vandenberg Air Force Base in California. The explorer will launch on June 15, 2018, from Kwajalein Atoll in the Marshall Islands (June 14 in the continental United States) on the Pegasus XL, which is attached to the company's L-1011 Stargazer aircraft. ICON will study the frontier of space - the dynamic zone high in Earth's atmosphere where terrestrial weather from below meets space weather above. The explorer will help determine the physics of Earth's space environment and pave the way for mitigating its effects on our technology and communications systems.

  7. 10 CFR 60.75 - Inspections.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 2 2010-01-01 2010-01-01 false Inspections. 60.75 Section 60.75 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) DISPOSAL OF HIGH-LEVEL RADIOACTIVE WASTES IN GEOLOGIC REPOSITORIES Records, Reports, Tests, and Inspections § 60.75 Inspections. (a) DOE shall allow the Commission to inspect the premises...

  8. 10 CFR 76.121 - Inspections.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 10 Energy 2 2012-01-01 2012-01-01 false Inspections. 76.121 Section 76.121 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Reports and Inspections § 76.121 Inspections. (a) The Corporation shall afford to the Commission opportunity to inspect the premises and plants...

  9. 10 CFR 76.121 - Inspections.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 10 Energy 2 2013-01-01 2013-01-01 false Inspections. 76.121 Section 76.121 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Reports and Inspections § 76.121 Inspections. (a) The Corporation shall afford to the Commission opportunity to inspect the premises and plants...

  10. 10 CFR 76.121 - Inspections.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 10 Energy 2 2014-01-01 2014-01-01 false Inspections. 76.121 Section 76.121 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Reports and Inspections § 76.121 Inspections. (a) The Corporation shall afford to the Commission opportunity to inspect the premises and plants...

  11. 10 CFR 76.121 - Inspections.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 10 Energy 2 2011-01-01 2011-01-01 false Inspections. 76.121 Section 76.121 Energy NUCLEAR REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Reports and Inspections § 76.121 Inspections. (a) The Corporation shall afford to the Commission opportunity to inspect the premises and plants...

  12. Electronic Inspection of Beef

    NASA Technical Reports Server (NTRS)

    Anselmo, Victor J.; Gammell, Paul M.; Clark, Jerry

    1987-01-01

    Two proposed methods for grading beef quality based on inspection by electronic equipment: one method uses television camera to generate image of a cut of beef as customer sees it; other uses ultrasonics to inspect live animal or unsliced carcasses. Both methods show promise for automated meat inspection.

  13. Advanced development receiver thermal vacuum tests with cold wall

    NASA Technical Reports Server (NTRS)

    Sedgwick, Leigh M.

    1991-01-01

    The first ever testing of a full size solar dynamic heat receiver using high temperature thermal energy storage was completed. The heat receiver was designed to meet the requirements for operation on the Space Station Freedom. The purpose of the test program was to quantify the receiver thermodynamic performance, its operating temperatures, and thermal response to changes in environmental and power module interface boundary conditions. The heat receiver was tested in a vacuum chamber with liquid nitrogen cold shrouds and an aperture cold plate to partially simulate a low Earth orbit environment. The cavity of the receiver was heated by an infrared quartz lamp heater with 30 independently controllable zones to produce flux distributions typical of candidate concentrators. A closed Brayton cycle engine simulator conditioned a helium xenon gas mixture to specific interface conditions to simulate various operational modes of the solar dynamic power module. Inlet gas temperature, pressure, and flow rate were independently varied. A total of 58 simulated orbital cycles were completed during the test conduct period. The test hardware, execution of testing, test data, and post test inspections are described.

  14. Modeling and control of a cable-suspended robot for inspection of vertical structures

    NASA Astrophysics Data System (ADS)

    Barry, Nicole; Fisher, Erin; Vaughan, Joshua

    2016-09-01

    In this paper, a cable-driven system is examined for the application of inspection of large, vertical-walled structures such as chemical storage tanks, large ship hulls, and high-rise buildings. Such cable-driven systems are not commonly used for these tasks due to vibration, which decreases inspection accuracy and degrades safety. The flexible nature of the cables make them difficult to control. In this paper, input shaping is implemented on a cable-driven system to reduce vibration. To design the input shapers, a model of the cable-driven system was developed. Analysis of the dominant dynamics and changes in them over the large workspace are also presented. The performance improvements provided by the input shaping controller are quantified through a series of simulations.

  15. 10 CFR 40.62 - Inspections.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 10 Energy 1 2010-01-01 2010-01-01 false Inspections. 40.62 Section 40.62 Energy NUCLEAR REGULATORY COMMISSION DOMESTIC LICENSING OF SOURCE MATERIAL Records, Reports, and Inspections § 40.62 Inspections. (a) Each licensee shall afford to the Commission at all reasonable times opportunity to inspect source or...

  16. Vapor-barrier Vacuum Isolation System

    NASA Technical Reports Server (NTRS)

    Weinstein, Leonard M. (Inventor); Taminger, Karen M. (Inventor)

    2014-01-01

    A system includes a collimated beam source within a vacuum chamber, a condensable barrier gas, cooling material, a pump, and isolation chambers cooled by the cooling material to condense the barrier gas. Pressure levels of each isolation chamber are substantially greater than in the vacuum chamber. Coaxially-aligned orifices connect a working chamber, the isolation chambers, and the vacuum chamber. The pump evacuates uncondensed barrier gas. The barrier gas blocks entry of atmospheric vapor from the working chamber into the isolation chambers, and undergoes supersonic flow expansion upon entering each isolation chamber. A method includes connecting the isolation chambers to the vacuum chamber, directing vapor to a boundary with the working chamber, and supersonically expanding the vapor as it enters the isolation chambers via the orifices. The vapor condenses in each isolation chamber using the cooling material, and uncondensed vapor is pumped out of the isolation chambers via the pump.

  17. 7 CFR 58.423 - Cheese vacuumizing chamber.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Cheese vacuumizing chamber. 58.423 Section 58.423 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards....423 Cheese vacuumizing chamber. The vacuum chamber shall be satisfactorily constructed and maintained...

  18. 7 CFR 58.423 - Cheese vacuumizing chamber.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Cheese vacuumizing chamber. 58.423 Section 58.423 Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards....423 Cheese vacuumizing chamber. The vacuum chamber shall be satisfactorily constructed and maintained...

  19. Engineering Matter Interactions Using Squeezed Vacuum

    NASA Astrophysics Data System (ADS)

    Zeytinoǧlu, Sina; Imamoǧlu, Ataç; Huber, Sebastian

    2017-04-01

    Virtually all interactions that are relevant for atomic and condensed matter physics are mediated by quantum fluctuations of the electromagnetic field vacuum. Consequently, controlling the vacuum fluctuations can be used to engineer the strength and the range of interactions. Recent experiments have used this premise to demonstrate novel quantum phases or entangling gates by embedding electric dipoles in photonic cavities or wave guides, which modify the electromagnetic fluctuations. Here, we show theoretically that the enhanced fluctuations in the antisqueezed quadrature of a squeezed vacuum state allow for engineering interactions between electric dipoles without the need for a photonic structure. Thus, the strength and range of the interactions can be engineered in a time-dependent way by changing the spatial profile of the squeezed vacuum in a traveling-wave geometry, which also allows the implementation of chiral dissipative interactions. Using experimentally realized squeezing parameters and including realistic losses, we predict single-atom cooperativities C of up to 10 for the squeezed-vacuum-enhanced interactions.

  20. Lightweight Vacuum Jacket for Cryogenic Insulation. Volume 1

    NASA Technical Reports Server (NTRS)

    Barclay, D. L.; Bell, J. E.; Brogren, E. W.; Straayer, J. W.

    1975-01-01

    The feasibility of producing a lightweight vacuum jacket using state-of-the-art technology and materials was examined. Design and analytical studies were made on a full-scale, orbital maneuvering system fuel tank. Preliminary design details were made for the tank assembly, including an optimized vacuum jacket and multilayer insulation system. A half-scale LH2 test model was designed and fabricated, and a force/stiffness proof test was conducted on the vacuum jacket. A vacuum leak rate of .000001 atmosphere ml of helium per second was measured, approximately 1500 hours of vacuum pressure were sustained, and 29 vacuum-pressure cycles were experienced prior to failure.

  1. Pegasus XL CYGNSS Fairing Inspection

    NASA Image and Video Library

    2016-10-20

    The payload fairing for an Orbital ATK Pegasus XL rocket is inspected in Building 1555 at Vandenberg Air Force Base in California. The fairing will protect NASA's Cyclone Global Navigation Satellite System (CYGNSS) spacecraft during launch. The rocket and spacecraft are being prepared at Vandenberg, then will be attached to the Orbital ATK L-1011 carrier aircraft and transported to NASA's Kennedy Space Center in Florida. CYGNSS will launch on the Pegasus XL rocket from the Skid Strip at Cape Canaveral Air Force Station. CYGNSS will make frequent and accurate measurements of ocean surface winds throughout the life cycle of tropical storms and hurricanes. The data that CYGNSS provides will enable scientists to probe key air-sea interaction processes that take place near the core of storms, which are rapidly changing and play a critical role in the beginning and intensification of hurricanes.

  2. 7 CFR 305.29 - Vacuum heat treatment schedule.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 5 2010-01-01 2010-01-01 false Vacuum heat treatment schedule. 305.29 Section 305.29... SERVICE, DEPARTMENT OF AGRICULTURE PHYTOSANITARY TREATMENTS Heat Treatments § 305.29 Vacuum heat treatment... vacuum at 8 hours. Maintain the vacuum until the end of the treatment. Gradually increase the temperature...

  3. [The evolution of vacuum extraction in obstetrics].

    PubMed

    Nikolov, A

    2010-01-01

    Vacuum extraction is one of the methods for assisted vaginal delivery. In this article the evolution of vacuum extraction in obstetrics is been discussed. Historical facts and data from the invention up to state-of-the-art vacuum systems in modern obstetrics are presented.

  4. Evaluation of a Prototype Hybrid Vacuum Pump to Provide Vacuum-Assisted Suspension for Above-Knee Prostheses

    PubMed Central

    Major, Matthew J.; Caldwell, Ryan; Fatone, Stefania

    2015-01-01

    Vacuum-assisted suspension (VAS) of prosthetic sockets utilizes a pump to evacuate air from between the prosthetic liner and socket, and are available as mechanical or electric systems. This technical note describes a hybrid pump that benefits from the advantages of mechanical and electric systems, and evaluates a prototype as proof-of-concept. Cyclical bench testing of the hybrid pump mechanical system was performed using a materials testing system to assess the relationship between compression cycles and vacuum pressure. Phase 1 in vivo testing of the hybrid pump was performed by an able-bodied individual using prosthesis simulator boots walking on a treadmill, and phase 2 involved an above-knee prosthesis user walking with the hybrid pump and a commercial electric pump for comparison. Bench testing of 300 compression cycles produced a maximum vacuum of 24 in-Hg. In vivo testing demonstrated that the hybrid pump continued to pull vacuum during walking, and as opposed to the commercial electric pump, did not require reactivation of the electric system during phase 2 testing. The novelty of the hybrid pump is that while the electric system provides rapid, initial vacuum suspension, the mechanical system provides continuous air evacuation while walking to maintain suspension without reactivation of the electric system, thereby allowing battery power to be reserved for monitoring vacuum levels. PMID:27462383

  5. 7 CFR 29.39 - Permissive inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 2 2010-01-01 2010-01-01 false Permissive inspection. 29.39 Section 29.39 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing... INSPECTION Regulations Definitions § 29.39 Permissive inspection. Inspection authorized under section 6 of...

  6. 7 CFR 29.39 - Permissive inspection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 2 2011-01-01 2011-01-01 false Permissive inspection. 29.39 Section 29.39 Agriculture Regulations of the Department of Agriculture AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing... INSPECTION Regulations Definitions § 29.39 Permissive inspection. Inspection authorized under section 6 of...

  7. 46 CFR 169.255 - Sanitary inspection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Sanitary inspection. 169.255 Section 169.255 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Inspection and Certification Inspections § 169.255 Sanitary inspection. At each inspection for certification...

  8. 46 CFR 169.255 - Sanitary inspection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Sanitary inspection. 169.255 Section 169.255 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Inspection and Certification Inspections § 169.255 Sanitary inspection. At each inspection for certification...

  9. 46 CFR 169.237 - Inspection standards.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 7 2011-10-01 2011-10-01 false Inspection standards. 169.237 Section 169.237 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Inspection and Certification Inspections § 169.237 Inspection standards. Vessels are inspected for compliance...

  10. 46 CFR 169.237 - Inspection standards.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 7 2010-10-01 2010-10-01 false Inspection standards. 169.237 Section 169.237 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) NAUTICAL SCHOOLS SAILING SCHOOL VESSELS Inspection and Certification Inspections § 169.237 Inspection standards. Vessels are inspected for compliance...

  11. Space-Based Telescopes for the Actionable Refinement of Ephemeris Systems and Test Engineering

    DTIC Science & Technology

    2011-12-01

    Space Surveillance Network STARE Space-based Telescopes for the Actionable Refinement of Ephemeris STK Satellite Toolkit SV Space Vehicle TAMU...vacuum bake out and visual inspection. Additionally, it is prescribed that these tests be performed in accordance with GSFC-STD-7000, more commonly...environment that a FV will see in orbit. Tools such as Solid Works and NX-Ideas can be used to build CAD models to visually validate engineering

  12. NDT applications in a successful fracture critical bridge inspection program and anchor bolt inspection program

    NASA Astrophysics Data System (ADS)

    Fish, Philip E.

    1995-05-01

    In 1978, Wisconsin Department of Transportation discovered major cracking on a two-girder, fracture critical structure, just four years after it was constructed. In 1981, on the same structure, now seven years old, major cracking was discovered in the tie girder flange of the tied arch span. This is one example of the type of failures that transportation departments discovered on welded structures in the 1970's and '80's. The failures from welded details and pinned connections lead to much stricter standards for present day designs. All areas were affected: design with identification of fatigue-prone details and classification of fatigue categories; material requirements with emphasis on toughness and weldability; increased welding and fabrication standards with licensure of fabrication shops to minimum quality standards including personnel; and an increased effort on inspection of existing bridges, where critical details were overlooked or missed in the past. FHWA inspection requirements for existing structures increased through this same time period, in reaction to the failures that had occurred. Obviously, many structures in Wisconsin were not built to the standards now required, thus the importance for quality inspection techniques. The new FHWA inspection requirements now being implemented throughout the nation require an in-depth, hands-on type inspection at a specified frequency, on all fracture critical structures. Wisconsin Department of Transportation started an in-depth inspection program in 1985 and made it a full time program in 1987. This program included extensive nondestructive testing. Ultrasonic inspection has played a major role in this type of inspection. All fracture critical structures, pin and hanger systems, and pinned connections are inspected on a five-year cycle now. The program requires an experienced inspection team and a practical inspection approach. Extensive preparation is required with review of all design, construction, and

  13. Gravitational collapse and the vacuum energy

    NASA Astrophysics Data System (ADS)

    Campos, M.

    2014-03-01

    To explain the accelerated expansion of the universe, models with interacting dark components (dark energy and dark matter) have been considered recently in the literature. Generally, the dark energy component is physically interpreted as the vacuum energy of the all fields that fill the universe. As the other side of the same coin, the influence of the vacuum energy on the gravitational collapse is of great interest. We study such collapse adopting different parameterizations for the evolution of the vacuum energy. We discuss the homogeneous collapsing star fluid, that interacts with a vacuum energy component, using the stiff matter case as example. We conclude this work with a discussion of the Cahill-McVittie mass for the collapsed object.

  14. Gravitational baryogenesis in running vacuum models

    NASA Astrophysics Data System (ADS)

    Oikonomou, V. K.; Pan, Supriya; Nunes, Rafael C.

    2017-08-01

    We study the gravitational baryogenesis mechanism for generating baryon asymmetry in the context of running vacuum models. Regardless of whether these models can produce a viable cosmological evolution, we demonstrate that they produce a nonzero baryon-to-entropy ratio even if the universe is filled with conformal matter. This is a sound difference between the running vacuum gravitational baryogenesis and the Einstein-Hilbert one, since in the latter case, the predicted baryon-to-entropy ratio is zero. We consider two well known and most used running vacuum models and show that the resulting baryon-to-entropy ratio is compatible with the observational data. Moreover, we also show that the mechanism of gravitational baryogenesis may constrain the running vacuum models.

  15. Recovery of materials from waste printed circuit boards by vacuum pyrolysis and vacuum centrifugal separation.

    PubMed

    Zhou, Yihui; Wu, Wenbiao; Qiu, Keqiang

    2010-11-01

    In this research, a two-step process consisting of vacuum pyrolysis and vacuum centrifugal separation was employed to treat waste printed circuit boards (WPCBs). Firstly, WPCBs were pyrolysed under vacuum condition at 600 °C for 30 min in a lab-scale reactor. Then, the obtained pyrolysis residue was heated under vacuum until the solder was melted, and then the molten solder was separated from the pyrolysis residue by the centrifugal force. The results of vacuum pyrolysis showed that the type-A of WPCBs (the base plates of which was made from cellulose paper reinforced phenolic resin) pyrolysed to form an average of 67.97 wt.% residue, 27.73 wt.% oil, and 4.30 wt.% gas; and pyrolysis of the type-B of WPCBs (the base plates of which was made from glass fiber reinforced epoxy resin) led to an average mass balance of 72.20 wt.% residue, 21.45 wt.% oil, and 6.35 wt.% gas. The results of vacuum centrifugal separation showed that the separation of solder was complete when the pyrolysis residue was heated at 400 °C, and the rotating drum was rotated at 1200 rpm for 10 min. The pyrolysis oil and gas can be used as fuel or chemical feedstock after treatment. The pyrolysis residue after solder separation contained various metals, glass fibers and other inorganic materials, which could be recycled for further processing. The recovered solder can be reused directly and it can also be a good resource of lead and tin for refining. Copyright © 2010 Elsevier Ltd. All rights reserved.

  16. Optimizing image-based patterned defect inspection through FDTD simulations at multiple ultraviolet wavelengths

    NASA Astrophysics Data System (ADS)

    Barnes, Bryan M.; Zhou, Hui; Henn, Mark-Alexander; Sohn, Martin Y.; Silver, Richard M.

    2017-06-01

    The sizes of non-negligible defects in the patterning of a semiconductor device continue to decrease as the dimensions for these devices are reduced. These "killer defects" disrupt the performance of the device and must be adequately controlled during manufacturing, and new solutions are required to improve optics-based defect inspection. To this end, our group has reported [Barnes et al., Proc. SPIE 1014516 (2017)] our initial five-wavelength simulation study, evaluating the extensibility of defect inspection by reducing the inspection wavelength from a deep-ultraviolet wavelength to wavelengths in the vacuum ultraviolet and the extreme ultraviolet. In that study, a 47 nm wavelength yielded enhancements in the signal to noise (SNR) by a factor of five compared to longer wavelengths and in the differential intensities by as much as three orders-of-magnitude compared to 13 nm. This paper briefly reviews these recent findings and investigates the possible sources for these disparities between results at 13 nm and 47 nm wavelengths. Our in-house finite-difference time-domain code (FDTD) is tested in both two and three dimensions to determine how computational conditions contributed to the results. A modified geometry and materials stack is presented that offers a second viewpoint of defect detectability as functions of wavelength, polarization, and defect type. Reapplication of the initial SNR-based defect metric again yields no detection of a defect at λ = 13 nm, but additional image preprocessing now enables the computation of the SNR for λ = 13 nm simulated images and has led to a revised defect metric that allows comparisons at all five wavelengths.

  17. Diffraction-limited storage-ring vacuum technology

    PubMed Central

    Al-Dmour, Eshraq; Ahlback, Jonny; Einfeld, Dieter; Tavares, Pedro Fernandes; Grabski, Marek

    2014-01-01

    Some of the characteristics of recent ultralow-emittance storage-ring designs and possibly future diffraction-limited storage rings are a compact lattice combined with small magnet apertures. Such requirements present a challenge for the design and performance of the vacuum system. The vacuum system should provide the required vacuum pressure for machine operation and be able to handle the heat load from synchrotron radiation. Small magnet apertures result in the conductance of the chamber being low, and lumped pumps are ineffective. One way to provide the required vacuum level is by distributed pumping, which can be realised by the use of a non-evaporable getter (NEG) coating of the chamber walls. It may not be possible to use crotch absorbers to absorb the heat from the synchrotron radiation because an antechamber is difficult to realise with such a compact lattice. To solve this, the chamber walls can work as distributed absorbers if they are made of a material with good thermal conductivity, and distributed cooling is used at the location where the synchrotron radiation hits the wall. The vacuum system of the 3 GeV storage ring of MAX IV is used as an example of possible solutions for vacuum technologies for diffraction-limited storage rings. PMID:25177979

  18. Electric Propulsion Laboratory Vacuum Chamber

    NASA Image and Video Library

    1964-06-21

    Engineer Paul Reader and his colleagues take environmental measurements during testing of a 20-inch diameter ion engine in a vacuum tank at the Electric Propulsion Laboratory (EPL). Researchers at the Lewis Research Center were investigating the use of a permanent-magnet circuit to create the magnetic field required power electron bombardment ion engines. Typical ion engines use a solenoid coil to create this magnetic field. It was thought that the substitution of a permanent magnet would create a comparable magnetic field with a lower weight. Testing of the magnet system in the EPL vacuum tanks revealed no significant operational problems. Reader found the weight of the two systems was similar, but that the thruster’s efficiency increased with the magnet. The EPL contained a series of large vacuum tanks that could be used to simulate conditions in space. Large vacuum pumps reduced the internal air pressure, and a refrigeration system created the cryogenic temperatures found in space.

  19. Credit BG. Looking southeast at Test Stand "D" (Building 4223/E24). ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    Credit BG. Looking southeast at Test Stand "D" (Building 4223/E-24). Left foreground contains six high-pressure nitrogen tanks which supplied nitrogen for operation of propellant valves. Several tanks for other substances have been removed from the base of the tower as part of decontamination and dismantling program. The vertical vacuum test cell can be seen in the tower behind the western sunscreen. At the top of the tower in the northeast corner is the interstage condenser used in the series of vacuum ejectors; at the top of the condenser is one of two Z-stage ejectors used to evacuate the condenser. The hoist beam for lifting/lowering rocket engines can be clearly seen projecting to the west over the pavement. In the distance on the right are Clayton water-tube steam generators from Building 4280/E-81, and the towers for Test Stand "C" and its scrubber-condenser - Jet Propulsion Laboratory Edwards Facility, Test Stand D, Edwards Air Force Base, Boron, Kern County, CA

  20. 15 CFR 716.3 - Consent to inspections; warrants for inspections.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 15 Commerce and Foreign Trade 2 2011-01-01 2011-01-01 false Consent to inspections; warrants for inspections. 716.3 Section 716.3 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS...

  1. 15 CFR 716.3 - Consent to inspections; warrants for inspections.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 15 Commerce and Foreign Trade 2 2010-01-01 2010-01-01 false Consent to inspections; warrants for inspections. 716.3 Section 716.3 Commerce and Foreign Trade Regulations Relating to Commerce and Foreign Trade (Continued) BUREAU OF INDUSTRY AND SECURITY, DEPARTMENT OF COMMERCE CHEMICAL WEAPONS CONVENTION REGULATIONS...

  2. Using virtual reality technology for aircraft visual inspection training: presence and comparison studies.

    PubMed

    Vora, Jeenal; Nair, Santosh; Gramopadhye, Anand K; Duchowski, Andrew T; Melloy, Brian J; Kanki, Barbara

    2002-11-01

    The aircraft maintenance industry is a complex system consisting of several interrelated human and machine components. Recognizing this, the Federal Aviation Administration (FAA) has pursued human factors related research. In the maintenance arena the research has focused on the aircraft inspection process and the aircraft inspector. Training has been identified as the primary intervention strategy to improve the quality and reliability of aircraft inspection. If training is to be successful, it is critical that we provide aircraft inspectors with appropriate training tools and environment. In response to this need, the paper outlines the development of a virtual reality (VR) system for aircraft inspection training. VR has generated much excitement but little formal proof that it is useful. However, since VR interfaces are difficult and expensive to build, the computer graphics community needs to be able to predict which applications will benefit from VR. To address this important issue, this research measured the degree of immersion and presence felt by subjects in a virtual environment simulator. Specifically, it conducted two controlled studies using the VR system developed for visual inspection task of an aft-cargo bay at the VR Lab of Clemson University. Beyond assembling the visual inspection virtual environment, a significant goal of this project was to explore subjective presence as it affects task performance. The results of this study indicated that the system scored high on the issues related to the degree of presence felt by the subjects. As a next logical step, this study, then, compared VR to an existing PC-based aircraft inspection simulator. The results showed that the VR system was better and preferred over the PC-based training tool.

  3. Federal Facilities Inspections: A Guide to EPA's Access and Inspection Authorities

    EPA Pesticide Factsheets

    This brochure outlines the legal authority for EPA, or one of its authorized representatives, to inspect a federal facility for compliance with environmental laws. It also identifies the federal, state, or tribal inspectors who may conduct inspections.

  4. Vacuum Energy and Inflation: 4. An Inflationary Universe

    ERIC Educational Resources Information Center

    Huggins, Elisha

    2013-01-01

    This is the fourth paper in a series of four. The first paper in the series, "Vacuum Energy and Inflation: 1. A Liter of Vacuum Energy" [EJ1024183] discusses an example of vacuum energy. Vacuum energy is explained as an energy with a negative pressure whose energy density remains constant in an expanding space. Paper 2, "Vacuum…

  5. 21 CFR 884.5070 - Vacuum abortion system.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Vacuum abortion system. 884.5070 Section 884.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... § 884.5070 Vacuum abortion system. (a) Identification. A vacuum abortion system is a device designed to...

  6. 46 CFR 153.368 - Pressure-vacuum valves.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 5 2014-10-01 2014-10-01 false Pressure-vacuum valves. 153.368 Section 153.368 Shipping... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Cargo Venting Systems § 153.368 Pressure-vacuum valves. (a) The pressure side of a required pressure-vacuum relief valve...

  7. 46 CFR 153.368 - Pressure-vacuum valves.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 5 2011-10-01 2011-10-01 false Pressure-vacuum valves. 153.368 Section 153.368 Shipping... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Cargo Venting Systems § 153.368 Pressure-vacuum valves. (a) The pressure side of a required pressure-vacuum relief valve...

  8. 46 CFR 153.368 - Pressure-vacuum valves.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 5 2012-10-01 2012-10-01 false Pressure-vacuum valves. 153.368 Section 153.368 Shipping... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Cargo Venting Systems § 153.368 Pressure-vacuum valves. (a) The pressure side of a required pressure-vacuum relief valve...

  9. 46 CFR 153.368 - Pressure-vacuum valves.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 5 2013-10-01 2013-10-01 false Pressure-vacuum valves. 153.368 Section 153.368 Shipping... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Cargo Venting Systems § 153.368 Pressure-vacuum valves. (a) The pressure side of a required pressure-vacuum relief valve...

  10. 46 CFR 153.368 - Pressure-vacuum valves.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 5 2010-10-01 2010-10-01 false Pressure-vacuum valves. 153.368 Section 153.368 Shipping... BULK LIQUID, LIQUEFIED GAS, OR COMPRESSED GAS HAZARDOUS MATERIALS Design and Equipment Cargo Venting Systems § 153.368 Pressure-vacuum valves. (a) The pressure side of a required pressure-vacuum relief valve...

  11. 21 CFR 884.5070 - Vacuum abortion system.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Vacuum abortion system. 884.5070 Section 884.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... § 884.5070 Vacuum abortion system. (a) Identification. A vacuum abortion system is a device designed to...

  12. 21 CFR 884.5070 - Vacuum abortion system.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Vacuum abortion system. 884.5070 Section 884.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... § 884.5070 Vacuum abortion system. (a) Identification. A vacuum abortion system is a device designed to...

  13. 21 CFR 884.5070 - Vacuum abortion system.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Vacuum abortion system. 884.5070 Section 884.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... § 884.5070 Vacuum abortion system. (a) Identification. A vacuum abortion system is a device designed to...

  14. 21 CFR 884.5070 - Vacuum abortion system.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Vacuum abortion system. 884.5070 Section 884.5070 Food and Drugs FOOD AND DRUG ADMINISTRATION, DEPARTMENT OF HEALTH AND HUMAN SERVICES (CONTINUED... § 884.5070 Vacuum abortion system. (a) Identification. A vacuum abortion system is a device designed to...

  15. The localized quantum vacuum field

    NASA Astrophysics Data System (ADS)

    Dragoman, D.

    2008-03-01

    A model for the localized quantum vacuum is proposed in which the zero-point energy (ZPE) of the quantum electromagnetic field originates in energy- and momentum-conserving transitions of material systems from their ground state to an unstable state with negative energy. These transitions are accompanied by emissions and re-absorptions of real photons, which generate a localized quantum vacuum in the neighborhood of material systems. The model could help resolve the cosmological paradox associated with the ZPE of electromagnetic fields, while reclaiming quantum effects associated with quantum vacuum such as the Casimir effect and the Lamb shift. It also offers a new insight into the Zitterbewegung of material particles.

  16. Progress and achievements of R&D activities for the ITER vacuum vessel

    NASA Astrophysics Data System (ADS)

    Nakahira, M.; Takahashi, H.; Koizumi, K.; Onozuka, M.; Ioki, K.

    2001-04-01

    The Full Scale Sector Model Project, which was initiated in 1995 as one of the Seven Large Projects for ITER R&D, has been continued with the joint effort of the ITER Joint Central Team and the Japanese, Russian Federation and United States Home Teams. The fabrication of a full scale 18° toroidal sector, which is composed of two 9° sectors spliced at the port centre, was successfully completed in September 1997 with a dimensional accuracy of +/-3 mm for the total height and total width. Both sectors were shipped to the test site at the Japan Atomic Energy Research Institute and the integration test of the sectors was begun in October 1997. The integration test involves the adjustment of field joints, automatic narrow gap tungsten inert gas welding of field joints with splice plates and inspection of the joints by ultrasonic testing, as required for the initial assembly of the ITER vacuum vessel. This first demonstration of field joint welding and the performance test of the mechanical characteristics were completed in May 1998, and all the results obtained have satisfied the ITER design. In addition to these tests, integration with the midplane port extension fabricated by the Russian Home Team by using a fully remotized welding and cutting system developed by the US Home Team was completed in March 2000. The article describes the progress, achievements and latest status of the R&D activities for the ITER vacuum vessel.

  17. Vacuum casting of thick polymeric films

    NASA Technical Reports Server (NTRS)

    Cuddihy, E. F.; Moacanin, J.

    1979-01-01

    Bubble formation and layering, which often plague vacuum-evaporated films, are prevented by properly regulating process parameters. Vacuum casting may be applicable to forming thick films of other polymer/solvent solutions.

  18. 14 CFR 25.1433 - Vacuum systems.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Miscellaneous Equipment § 25.1433 Vacuum systems. There... discharge lines from the vacuum air pump when the delivery temperature of the air becomes unsafe. [Doc. No...

  19. Ceramic vacuum tubes for geothermal well logging

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelly, R.D.

    1977-01-12

    The results of investigations carried out into the availability and suitability of ceramic vacuum tubes for the development of logging tools for geothermal wells are summarized. Design data acquired in the evaluation of ceramic vacuum tubes for the development of a 500/sup 0/C instrumentation amplifier are presented. The general requirements for ceramic vacuum tubes for application to the development of high temperature well logs are discussed. Commercially available tubes are described and future contract activities that specifically relate to ceramic vacuum tubes are detailed. Supplemental data is presented in the appendix. (MHR)

  20. A Novel Method of Autonomous Inspection for Transmission Line based on Cable Inspection Robot LiDAR Data

    PubMed Central

    Qin, Xinyan; Wu, Gongping; Fan, Fei; Ye, Xuhui; Mei, Quanjie

    2018-01-01

    With the growth of the national economy, there is increasing demand for electricity, which forces transmission line corridors to become structurally complicated and extend to complex environments (e.g., mountains, forests). It is a great challenge to inspect transmission line in these regions. To address these difficulties, a novel method of autonomous inspection for transmission line is proposed based on cable inspection robot (CIR) LiDAR data, which mainly includes two steps: preliminary inspection and autonomous inspection. In preliminary inspection, the position and orientation system (POS) data is used for original point cloud dividing, ground point filtering, and structured partition. A hierarchical classification strategy is established to identify the classes and positions of the abnormal points. In autonomous inspection, CIR can autonomously reach the specified points through inspection planning. These inspection targets are imaged with PTZ (pan, tilt, zoom) cameras by coordinate transformation. The feasibility and effectiveness of the proposed method are verified by test site experiments and actual line experiments, respectively. The proposed method greatly reduces manpower and improves inspection accuracy, providing a theoretical basis for intelligent inspection of transmission lines in the future. PMID:29462865

  1. Compressed Air/Vacuum Transportation Techniques

    NASA Astrophysics Data System (ADS)

    Guha, Shyamal

    2011-03-01

    General theory of compressed air/vacuum transportation will be presented. In this transportation, a vehicle (such as an automobile or a rail car) is powered either by compressed air or by air at near vacuum pressure. Four version of such transportation is feasible. In all versions, a ``c-shaped'' plastic or ceramic pipe lies buried a few inches under the ground surface. This pipe carries compressed air or air at near vacuum pressure. In type I transportation, a vehicle draws compressed air (or vacuum) from this buried pipe. Using turbine or reciprocating air cylinder, mechanical power is generated from compressed air (or from vacuum). This mechanical power transferred to the wheels of an automobile (or a rail car) drives the vehicle. In type II-IV transportation techniques, a horizontal force is generated inside the plastic (or ceramic) pipe. A set of vertical and horizontal steel bars is used to transmit this force to the automobile on the road (or to a rail car on rail track). The proposed transportation system has following merits: virtually accident free; highly energy efficient; pollution free and it will not contribute to carbon dioxide emission. Some developmental work on this transportation will be needed before it can be used by the traveling public. The entire transportation system could be computer controlled.

  2. An international survey of building energy codes and their implementation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Evans, Meredydd; Roshchanka, Volha; Graham, Peter

    Buildings are key to low-carbon development everywhere, and many countries have introduced building energy codes to improve energy efficiency in buildings. Yet, building energy codes can only deliver results when the codes are implemented. For this reason, studies of building energy codes need to consider implementation of building energy codes in a consistent and comprehensive way. This research identifies elements and practices in implementing building energy codes, covering codes in 22 countries that account for 70% of global energy demand from buildings. Access to benefits of building energy codes depends on comprehensive coverage of buildings by type, age, size, andmore » geographic location; an implementation framework that involves a certified agency to inspect construction at critical stages; and independently tested, rated, and labeled building energy materials. Training and supporting tools are another element of successful code implementation, and their role is growing in importance, given the increasing flexibility and complexity of building energy codes. Some countries have also introduced compliance evaluation and compliance checking protocols to improve implementation. This article provides examples of practices that countries have adopted to assist with implementation of building energy codes.« less

  3. Vacuum chamber-free centrifuge with magnetic bearings.

    PubMed

    Park, Cheol Hoon; Kim, Soohyun; Kim, Kyung-Soo

    2013-09-01

    Centrifuges are devices that separate particles of different densities and sizes through the application of a centrifugal force. If a centrifuge could be operated under atmospheric conditions, all vacuum-related components such as the vacuum chamber, vacuum pump, diffusion pump, and sealing could be removed from a conventional centrifuge system. The design and manufacturing procedure for centrifuges could then be greatly simplified to facilitate the production of lightweight centrifuge systems of smaller volume. Furthermore, the maintenance costs incurred owing to wear and tear due to conventional ball bearings would be eliminated. In this study, we describe a novel vacuum chamber-free centrifuge supported by magnetic bearings. We demonstrate the feasibility of the vacuum chamber-free centrifuge by presenting experimental results that verify its high-speed support capability and motoring power capacity.

  4. Vacuum deposition and curing of liquid monomers

    DOEpatents

    Affinito, J.D.

    1993-11-09

    The present invention is the formation of solid polymer layers under vacuum. More specifically, the present invention is the use of standard polymer layer-making equipment that is generally used in an atmospheric environment in a vacuum, and degassing the monomer material prior to injection into the vacuum. Additional layers of polymer or metal may be vacuum deposited onto solid polymer layers. Formation of polymer layers under a vacuum improves material and surface characteristics, and subsequent quality of bonding to additional layers. Further advantages include use of less to no photoinitiator for curing, faster curing, fewer impurities in the polymer electrolyte, as well as improvement in material properties including no trapped gas resulting in greater density, and reduced monomer wetting angle that facilitates spreading of the monomer and provides a smoother finished surface.

  5. Vacuum deposition and curing of liquid monomers

    DOEpatents

    Affinito, J.D.

    1995-03-07

    The present invention is the formation of solid polymer layers under vacuum. More specifically, the present invention is the use of ``standard`` polymer layer-making equipment that is generally used in an atmospheric environment in a vacuum, and degassing the monomer material prior to injection into the vacuum. Additional layers of polymer or metal or oxide may be vacuum deposited onto solid polymer layers. Formation of polymer layers under a vacuum improves material and surface characteristics, and subsequent quality of bonding to additional layers. Further advantages include use of less to no photoinitiator for curing, faster curing, fewer impurities in the polymer electrolyte, as well as improvement in material properties including no trapped gas resulting in greater density, and reduced monomer wetting angle that facilitates spreading of the monomer and provides a smoother finished surface.

  6. Vacuum deposition and curing of liquid monomers

    DOEpatents

    Affinito, John D.

    1993-01-01

    The present invention is the formation of solid polymer layers under vacuum. More specifically, the present invention is the use of "standard" polymer layer-making equipment that is generally used in an atmospheric environment in a vacuum, and degassing the monomer material prior to injection into the vacuum. Additional layers of polymer or metal may be vacuum deposited onto solid polymer layers. Formation of polymer layers under a vacuum improves material and surface characteristics, and subsequent quality of bonding to additional layers. Further advantages include use of less to no photoinitiator for curing, faster curing, fewer impurities in the polymer electrolyte, as well as improvement in material properties including no trapped gas resulting in greater density, and reduced monomer wetting angle that facilitates spreading of the monomer and provides a smoother finished surface.

  7. Vacuum deposition and curing of liquid monomers

    DOEpatents

    Affinito, John D.

    1995-01-01

    The present invention is the formation of solid polymer layers under vacuum. More specifically, the present invention is the use of "standard" polymer layer-making equipment that is generally used in an atmospheric environment in a vacuum, and degassing the monomer material prior to injection into the vacuum. Additional layers of polymer or metal or oxide may be vacuum deposited onto solid polymer layers. Formation of polymer layers under a vacuum improves material and surface characteristics, and subsequent quality of bonding to additional layers. Further advantages include use of less to no photoinitiator for curing, faster curing, fewer impurities in the polymer electrolyte, as well as improvement in material properties including no trapped gas resulting in greater density, and reduced monomer wetting angle that facilitates spreading of the monomer and provides a smoother finished surface.

  8. 10 CFR 26.821 - Inspections.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... representatives to inspect, copy, or take away copies of its records and to inspect its premises, activities, and... representatives may inspect, copy, or take away copies of any licensee's, other entity's, or C/V's documents...

  9. Cryogenic Insulation System for Soft Vacuum

    NASA Technical Reports Server (NTRS)

    Augustynowicz, S. D.; Fesmire, J. E.

    1999-01-01

    The development of a cryogenic insulation system for operation under soft vacuum is presented in this paper. Conventional insulation materials for cryogenic applications can be divided into three levels of thermal performance, in terms of apparent thermal conductivity [k-value in milliwatt per meter-kelvin (mW/m-K)]. System k-values below 0.1 can be achieved for multilayer insulation operating at a vacuum level below 1 x 10(exp -4) torr. For fiberglass or powder operating below 1 x 10(exp -3) torr, k-values of about 2 are obtained. For foam and other materials at ambient pressure, k-values around 30 are typical. New industry and aerospace applications require a versatile, robust, low-cost thermal insulation with performance in the intermediate range. The target for the new composite insulation system is a k-value below 4.8 mW/m-K (R-30) at a soft vacuum level (from 1 to 10 torr) and boundary temperatures of approximately 77 and 293 kelvin (K). Many combinations of radiation shields, spacers, and composite materials were tested from high vacuum to ambient pressure using cryostat boiloff methods. Significant improvement over conventional systems in the soft vacuum range was demonstrated. The new layered composite insulation system was also shown to provide key benefits for high vacuum applications as well.

  10. 47 CFR 0.460 - Requests for inspection of records which are routinely available for public inspection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... routinely available for public inspection. 0.460 Section 0.460 Telecommunication FEDERAL COMMUNICATIONS... § 0.460 Requests for inspection of records which are routinely available for public inspection. (a) Sections 0.453 and 0.455 list those Commission records which are routinely available for public inspection...

  11. Automated Visual Inspection Of Integrated Circuits

    NASA Astrophysics Data System (ADS)

    Noppen, G.; Oosterlinck, Andre J.

    1989-07-01

    One of the major application fields of image processing techniques is the 'visual inspection'. For a number of rea-sons, the automated visual inspection of Integrated Circuits (IC's) has drawn a lot of attention. : Their very strict design makes them very suitable for an automated inspection. : There is already a lot of experience in the comparable Printed Circuit Board (PCB) and mask inspection. : The mechanical handling of wafers and dice is already an established technology. : Military and medical IC's should be a 100 % failproof. : IC inspection gives a high and allinost immediate payback. In this paper we wil try to give an outline of the problems involved in IC inspection, and the algorithms and methods used to overcome these problems. We will not go into de-tail, but we will try to give a general understanding. Our attention will go to the following topics. : An overview of the inspection process, with an emphasis on the second visual inspection. : The problems encountered in IC inspection, as opposed to the comparable PCB and mask inspection. : The image acquisition devices that can be used to obtain 'inspectable' images. : A general overview of the algorithms that can be used. : A short description of the algorithms developed at the ESAT-MI2 division of the katholieke Universiteit Leuven.

  12. Vacuum-assisted venous return reduces blood usage.

    PubMed

    Banbury, Michael K; White, Jennifer A; Blackstone, Eugene H; Cosgrove, Delos M

    2003-09-01

    To determine whether vacuum-assisted venous return has clinical advantages over conventional gravity drainage apart from allowing the use of smaller cannulas and shorter tubing. A total of 150 valve operations were performed at our institution between February and July 1999 using vacuum-assisted venous return with small venous cannulas connected to short tubing. These were compared with (1) 83 valve operations performed between April 1997 and January 1998 using the initial version of vacuum-assisted venous return, and (2) 124 valve operations performed between January and April of 1997 using conventional gravity drainage. Priming volume, hematocrit value, red blood cell usage, and total blood product usage were compared multivariably. These comparisons were covariate and propensity adjusted for dissimilarities between the groups and confirmed by propensity-matched pairs analysis. Priming volume was 1.4 +/- 0.4 L for small-cannula vacuum-assisted venous return, 1.7 +/- 0.4 L for initial vacuum-assisted venous return, and 2.0 +/- 0.4 L for gravity drainage (P <.0001). Smaller priming resulted in higher hematocrit values both at the beginning of cardiopulmonary bypass (27% +/- 5% compared with 26% +/- 4% and 25% +/- 4%, respectively, P <.0001) and at the end (30% +/- 4% compared with 28% +/- 4% and 27% +/- 4%, respectively, P <.0001). Red cell transfusions were used in 17% of the patients having small-cannula vacuum-assisted venous return, 27% of the initial patients having vacuum-assisted venous return, and 37% of the patients having gravity drainage (P =.001); total blood product usage was 19%, 27%, and 39%, respectively (P =.002). Although ministernotomy also was associated with reduced blood product usage (P <.004), propensity matching on type of sternotomy confirmed the association of vacuum-assisted venous return with lowered blood product usage. Vacuum-assisted venous return results in (1) higher hematocrit values during cardiopulmonary bypass and (2) decreased

  13. Enabling inspection solutions for future mask technologies through the development of massively parallel E-Beam inspection

    NASA Astrophysics Data System (ADS)

    Malloy, Matt; Thiel, Brad; Bunday, Benjamin D.; Wurm, Stefan; Jindal, Vibhu; Mukhtar, Maseeh; Quoi, Kathy; Kemen, Thomas; Zeidler, Dirk; Eberle, Anna Lena; Garbowski, Tomasz; Dellemann, Gregor; Peters, Jan Hendrik

    2015-09-01

    The new device architectures and materials being introduced for sub-10nm manufacturing, combined with the complexity of multiple patterning and the need for improved hotspot detection strategies, have pushed current wafer inspection technologies to their limits. In parallel, gaps in mask inspection capability are growing as new generations of mask technologies are developed to support these sub-10nm wafer manufacturing requirements. In particular, the challenges associated with nanoimprint and extreme ultraviolet (EUV) mask inspection require new strategies that enable fast inspection at high sensitivity. The tradeoffs between sensitivity and throughput for optical and e-beam inspection are well understood. Optical inspection offers the highest throughput and is the current workhorse of the industry for both wafer and mask inspection. E-beam inspection offers the highest sensitivity but has historically lacked the throughput required for widespread adoption in the manufacturing environment. It is unlikely that continued incremental improvements to either technology will meet tomorrow's requirements, and therefore a new inspection technology approach is required; one that combines the high-throughput performance of optical with the high-sensitivity capabilities of e-beam inspection. To support the industry in meeting these challenges SUNY Poly SEMATECH has evaluated disruptive technologies that can meet the requirements for high volume manufacturing (HVM), for both the wafer fab [1] and the mask shop. Highspeed massively parallel e-beam defect inspection has been identified as the leading candidate for addressing the key gaps limiting today's patterned defect inspection techniques. As of late 2014 SUNY Poly SEMATECH completed a review, system analysis, and proof of concept evaluation of multiple e-beam technologies for defect inspection. A champion approach has been identified based on a multibeam technology from Carl Zeiss. This paper includes a discussion on the

  14. Infrared survey of 50 buildings constructed during 100 years: thermal performances and damage conditions

    NASA Astrophysics Data System (ADS)

    Ljungberg, Sven-Ake

    1995-03-01

    Different building constructions and craftsmanship give rise to different thermal performance and damage conditions. The building stock of most industrial countries consists of buildings of various age, and constructions, from old historic buildings with heavy stone or wooden construction, to new buildings with heavy or light concrete construction, or modern steel or wooden construction. In this paper the result from a detailed infrared survey of 50 buildings from six Swedish military camps is presented. The presentation is limited to a comparison of thermal performance and damage conditions of buildings of various ages, functions, and constructions, of a building period of more than 100 years. The result is expected to be relevant even to civilian buildings. Infrared surveys were performed during 1992-1993, with airborne, and mobile short- and longwave infrared systems, out- and indoor thermography. Interpretation and analysis of infrared data was performed with interactive image and analyzing systems. Field inspections were carried out with fiber optics system, and by ocular inspections. Air-exchange rate was measured in order to quantify air leakages through the building envelope, indicated in thermograms. The objects studied were single-family houses, barracks, office-, service-, school- and exercise buildings, military hotels and restaurants, aircraft hangars, and ship factory buildings. The main conclusions from this study are that most buildings from 1880 - 1940 have a solid construction with a high quality of craftsmanship, relatively good thermal performance, due to extremely thick walls, and adding insulation at the attic floor. From about 1940 - 1960 the quality of construction, thermal performance and craftsmanship seem to vary a lot. Buildings constructed during the period of 1960 - 1990 have in general the best thermal performance due to a better insulation capacity, however, also one finds here the greatest variety of problems. The result from this

  15. Capacity Building for School Development: Current Problems and Future Challenges

    ERIC Educational Resources Information Center

    Ho, Dora; Lee, Moosung

    2016-01-01

    This article offers a theoretical discussion on the current problems and future challenges of school capacity building in early childhood education (ECE), aiming to highlight some key areas for future research. In recent years, there has been a notable policy shift from monitoring quality through inspection to improving quality through school…

  16. Examination of the association between announced inspections and inspection scores.

    PubMed

    Waters, A Blake; VanDerslice, James; Porucznik, Christina A; Kim, Jaewhan; DeLegge, Royal; Durrant, Lynne

    2013-09-01

    In 2010 the Salt Lake Valley Health Department conducted a pilot of an announced inspection program utilizing a randomized assignment of restaurants to an intervention group with announced inspections and a control group that remained on the usual schedule of unannounced inspections. After adjusting for food type, visible kitchen, outside quality assurance, season, and standardized inspector, significant reductions were found in the odds ratios of personal hygiene (adjusted odds ratios [aOR] = 0.11, p = .00) and equipment cleanliness (aOR = 0.19, p = .00) violations. In the models for the control group, none of the odds ratios were statistically different from one, indicating no change in the postintervention time period as compared to the preintervention period.

  17. Overview of the software inspection process

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Lane, G.L.; Dabbs, R.

    1997-11-01

    This tutorial introduces attendees to the Inspection Process and teaches them how to organize and participate in a software inspection. The tutorial advocates the benefits of inspections and encourages attendees to socialize the inspection process in their organizations.

  18. Purifying Aluminum by Vacuum Distillation

    NASA Technical Reports Server (NTRS)

    Du Fresne, E. R.

    1985-01-01

    Proposed method for purifying aluminum employs one-step vacuum distillation. Raw material for process impure aluminum produced in electrolysis of aluminum ore. Impure metal melted in vacuum. Since aluminum has much higher vapor pressure than other constituents, boils off and condenses on nearby cold surfaces in proportions much greater than those of other constituents.

  19. Restaurant Inspection Scores and Foodborne Disease

    PubMed Central

    Pavlin, Boris I.; LaFleur, Bonnie J.; Ingram, L. Amanda; Schaffner, William

    2004-01-01

    Restaurants in the United States are regularly inspected by health departments, but few data exist regarding the effect of restaurant inspections on food safety. We examined statewide inspection records from January 1993 through April 2000. Data were available from 167,574 restaurant inspections. From 1993 to 2000, mean scores rose steadily from 80.2 to 83.8. Mean inspection scores of individual inspectors were 69–92. None of the 12 most commonly cited violations were critical food safety hazards. Establishments scoring <60 had a mean improvement of 16 points on subsequent inspections. Mean scores of restaurants experiencing foodborne disease outbreaks did not differ from restaurants with no reported outbreaks. A variety of factors influence the uniformity of restaurant inspections. The restaurant inspection system should be examined to identify ways to ensure food safety. PMID:15200861

  20. An open-architecture approach to defect analysis software for mask inspection systems

    NASA Astrophysics Data System (ADS)

    Pereira, Mark; Pai, Ravi R.; Reddy, Murali Mohan; Krishna, Ravi M.

    2009-04-01

    possible for the end-users to make use of their collected knowledge through the years of experience in mask inspection process by encapsulating the knowledge into software utilities and plugging them into NxDAT. The plug-in interface is designed with the intent of enabling the pro-active mask defect analysis teams to build competitive differentiation into their defect analysis process while protecting their knowledge internally within their company. By providing interface with all major standard layout and mask data formats, NxDAT enables correlation of defect data on reticles with design and mask databases, further extending the effectiveness of defect analysis for D2DB inspection. NxDAT also includes many other advanced features for easy and fast navigation, visual display of defects, defect selection, multi-tier classification, defect clustering and gridding, sophisticated CD and contact measurement analysis, repeatability analysis such as adder analysis, defect trend, capture rate etc.

  1. Fully Employing Software Inspections Data

    NASA Technical Reports Server (NTRS)

    Shull, Forrest; Feldmann, Raimund L.; Seaman, Carolyn; Regardie, Myrna; Godfrey, Sally

    2009-01-01

    Software inspections provide a proven approach to quality assurance for software products of all kinds, including requirements, design, code, test plans, among others. Common to all inspections is the aim of finding and fixing defects as early as possible, and thereby providing cost savings by minimizing the amount of rework necessary later in the lifecycle. Measurement data, such as the number and type of found defects and the effort spent by the inspection team, provide not only direct feedback about the software product to the project team but are also valuable for process improvement activities. In this paper, we discuss NASA's use of software inspections and the rich set of data that has resulted. In particular, we present results from analysis of inspection data that illustrate the benefits of fully utilizing that data for process improvement at several levels. Examining such data across multiple inspections or projects allows team members to monitor and trigger cross project improvements. Such improvements may focus on the software development processes of the whole organization as well as improvements to the applied inspection process itself.

  2. Breakdown-Resistant RF Connectors for Vacuum

    NASA Technical Reports Server (NTRS)

    Caro, Edward R.; Bonazza, Walter J.

    1987-01-01

    Resilient inserts compensate for insulation shrinkage. Coaxial-cable connector for radio-frequency (RF) energy resists electrical breakdown in vacuum. Used on RF equipment in vacuum chambers as well as in spaceborne radar and communication gear.

  3. Use Of Infrared Thermography For The Identification Of Design And Construction Faults In Buildings

    NASA Astrophysics Data System (ADS)

    Seeber, Stephen A.

    1984-03-01

    Many design and construction details can affect building energy consumption in unex-pected ways. Further, design and construction errors can increase building energy consumption, result in discomfort to building occupants and cause structural damage to the building. Infrared inspections can easily evaluate the energy efficiency of various aspects of a building's design and identify flaws that might otherwise be detected as a result of occupants' complaints or damage to the building's mechanical or structural systems. Infrared thermography can be used by the architect to evaluate his designs and by the contractor to control the quality of construction. This paper discusses a number of issues that can help determine the effectiveness of infrared building surveys. Following this, three case stud-ies will be presented to illustrate design flaws that were detected through infrared build-ing surveys.

  4. 9 CFR 354.121 - Ante-mortem inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... he may issue from time to time, be made of rabbits on the day of slaughter in any official plant... INSPECTION AND CERTIFICATION VOLUNTARY INSPECTION OF RABBITS AND EDIBLE PRODUCTS THEREOF Inspection Procedures; Ante-Mortem Inspections § 354.121 Ante-mortem inspection. An ante-mortem inspection of rabbits...

  5. 9 CFR 354.121 - Ante-mortem inspection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... he may issue from time to time, be made of rabbits on the day of slaughter in any official plant... INSPECTION AND CERTIFICATION VOLUNTARY INSPECTION OF RABBITS AND EDIBLE PRODUCTS THEREOF Inspection Procedures; Ante-Mortem Inspections § 354.121 Ante-mortem inspection. An ante-mortem inspection of rabbits...

  6. Breather cloth for vacuum curing

    NASA Technical Reports Server (NTRS)

    Reed, M. W.

    1979-01-01

    Finely-woven nylon cloth that has been treated with Teflon improves vacuum adhesive bonding of coatings to substrates. Cloth is placed over coating; entire assembly, including substrate, coating, and cloth, is placed in plastic vacuum bag for curing. Cloth allows coating to "breathe" when bag is evacuated. Applications include bonding film coatings to solar concentrators and collectors.

  7. Vacuum Gas Tungsten Arc Welding

    NASA Technical Reports Server (NTRS)

    Weeks, J. L.; Todd, D. T.; Wooten, J. R.

    1997-01-01

    A two-year program investigated vacuum gas tungsten arc welding (VGTAW) as a method to modify or improve the weldability of normally difficult-to-weld materials. After a vacuum chamber and GTAW power supply were modified, several difficult-to-weld materials were studied and key parameters developed. Finally, Incoloy 903 weld overlays were produced without microfissures.

  8. Apparatus For Metal/Inert-Gas Welding In Vacuum

    NASA Technical Reports Server (NTRS)

    Stocks, C. O.

    1994-01-01

    Metal/inert-gas welding-torch assembly operates in vacuum. Plasma generated in interior chamber and focused onto workpiece in vacuum. Pinch rollers feed wire to weld puddle. Controlled flow of plasma reduces dispersal in vacuum, preventing extinction.

  9. Apparatus for inspecting piping

    DOEpatents

    Zollingger, W. Thor; Appel, D. Keith; Park, Larry R.

    1995-01-01

    An inspection rabbit for inspecting piping systems having severe bends therein. The rabbit consists of a flexible, modular body containing a miniaturized eddy current inspection probe, a self-contained power supply for proper operation of the rabbit, an outer surface that allows ease of movement through piping systems and means for transmitting data generated by the inspection device. The body is preferably made of flexible polyvinyl chloride (PVC) tubing or, alternatively, silicone rubber with a shrink wrapping of polytetrafluoroethylene (TEFLON.RTM.). The body is formed to contain the power supply, preferably a plurality of batteries, and a spool of communication wire that connects to a data processing computer external to the piping system.

  10. Apparatus for inspecting piping

    DOEpatents

    Zollingger, W.T.; Appel, D.K.; Park, L.R.

    1995-03-21

    An inspection rabbit is described for inspecting piping systems having severe bends therein. The rabbit consists of a flexible, modular body containing a miniaturized eddy current inspection probe, a self-contained power supply for proper operation of the rabbit, an outer surface that allows ease of movement through piping systems and means for transmitting data generated by the inspection device. The body is preferably made of flexible polyvinyl chloride (PVC) tubing or, alternatively, silicone rubber with a shrink wrapping of polytetrafluoroethylene (TEFLON{trademark}). The body is formed to contain the power supply, preferably a plurality of batteries, and a spool of communication wire that connects to a data processing computer external to the piping system. 6 figures.

  11. TFTR diagnostic vacuum controller

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Olsen, D.; Persons, R.

    1981-01-01

    The TFTR diagnostic vacuum controller (DVC) provides in conjunction with the Central Instrumentation Control and Data Acquisition System (CICADA), control and monitoring for the pumps, valves and gauges associated with each individual diagnostic vacuum system. There will be approximately 50 systems on TFTR. Two standard versions of the controller (A and B) wil be provided in order to meet the requirements of two diagnostic manifold arrangements. All pump and valve sequencing, as well as protection features, will be implemented by the controller.

  12. 7 CFR 319.75-9 - Inspection and phytosanitary certificate of inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Beetle § 319.75-9 Inspection and phytosanitary certificate of inspection. (a) Any nursery stock, plant... importation. (b) Any nursery stock, plant, fruit, vegetable, root, bulb, seed, or other plant product... nursery stock, plant, fruit, vegetable, root, bulb, seed, or other plant product designated as a...

  13. An evaluation of costs and benefits of a vehicle periodic inspection scheme with six-monthly inspections compared to annual inspections.

    PubMed

    Keall, Michael D; Newstead, Stuart

    2013-09-01

    Although previous research suggests that safety benefits accrue from periodic vehicle inspection programmes, little consideration has been given to whether the benefits are sufficient to justify the often considerable costs of such schemes. Methodological barriers impede many attempts to evaluate the overall safety benefits of periodic vehicle inspection schemes, including this study, which did not attempt to evaluate the New Zealand warrant of fitness scheme as a whole. Instead, this study evaluated one aspect of the scheme: the effects of doubling the inspection frequency, from annual to biannual, when the vehicle reaches six years of age. In particular, reductions in safety-related vehicle faults were estimated together with the value of the safety benefits compared to the costs. When merged crash data, licensing data and roadworthiness inspection data were analysed, there were estimated to be improvements in injury crash involvement rates and prevalence of safety-related faults of respectively 8% (95% CI 0.4-15%) and 13.5% (95% CI 12.8-14.2%) associated with the increase from annual to 6-monthly inspections. The wide confidence interval for the drop in crash rate shows considerably statistical uncertainty about the precise size of the drop. Even assuming that this proportion of vehicle faults prevented by doubling the inspection frequency could be maintained over the vehicle age range 7-20 years, the safety benefits are very unlikely to exceed the additional costs of the 6-monthly inspections to the motorists, valued at $NZ 500 million annually excluding the overall costs of administering the scheme. The New Zealand warrant of fitness scheme as a whole cannot be robustly evaluated using the analysis approach used here, but the safety benefits would need to be substantial--yielding an unlikely 12% reduction in injury crashes--for benefits to equal costs. Copyright © 2013 Elsevier Ltd. All rights reserved.

  14. An international survey of building energy codes and their implementation

    DOE PAGES

    Evans, Meredydd; Roshchanka, Volha; Graham, Peter

    2017-08-01

    Buildings are key to low-carbon development everywhere, and many countries have introduced building energy codes to improve energy efficiency in buildings. Yet, building energy codes can only deliver results when the codes are implemented. For this reason, studies of building energy codes need to consider implementation of building energy codes in a consistent and comprehensive way. This research identifies elements and practices in implementing building energy codes, covering codes in 22 countries that account for 70% of global energy use in buildings. These elements and practices include: comprehensive coverage of buildings by type, age, size, and geographic location; an implementationmore » framework that involves a certified agency to inspect construction at critical stages; and building materials that are independently tested, rated, and labeled. Training and supporting tools are another element of successful code implementation. Some countries have also introduced compliance evaluation studies, which suggested that tightening energy requirements would only be meaningful when also addressing gaps in implementation (Pitt&Sherry, 2014; U.S. DOE, 2016b). Here, this article provides examples of practices that countries have adopted to assist with implementation of building energy codes.« less

  15. An international survey of building energy codes and their implementation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Evans, Meredydd; Roshchanka, Volha; Graham, Peter

    Buildings are key to low-carbon development everywhere, and many countries have introduced building energy codes to improve energy efficiency in buildings. Yet, building energy codes can only deliver results when the codes are implemented. For this reason, studies of building energy codes need to consider implementation of building energy codes in a consistent and comprehensive way. This research identifies elements and practices in implementing building energy codes, covering codes in 22 countries that account for 70% of global energy use in buildings. These elements and practices include: comprehensive coverage of buildings by type, age, size, and geographic location; an implementationmore » framework that involves a certified agency to inspect construction at critical stages; and building materials that are independently tested, rated, and labeled. Training and supporting tools are another element of successful code implementation. Some countries have also introduced compliance evaluation studies, which suggested that tightening energy requirements would only be meaningful when also addressing gaps in implementation (Pitt&Sherry, 2014; U.S. DOE, 2016b). Here, this article provides examples of practices that countries have adopted to assist with implementation of building energy codes.« less

  16. 46 CFR 107.271 - Inspection: Alterations.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Inspection: Alterations. 107.271 Section 107.271 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.271 Inspection: Alterations. After plans are...

  17. 46 CFR 107.271 - Inspection: Alterations.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Inspection: Alterations. 107.271 Section 107.271 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.271 Inspection: Alterations. After plans are...

  18. 46 CFR 107.271 - Inspection: Alterations.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Inspection: Alterations. 107.271 Section 107.271 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.271 Inspection: Alterations. After plans are...

  19. 46 CFR 107.271 - Inspection: Alterations.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Inspection: Alterations. 107.271 Section 107.271 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.271 Inspection: Alterations. After plans are...

  20. 46 CFR 107.271 - Inspection: Alterations.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Inspection: Alterations. 107.271 Section 107.271 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.271 Inspection: Alterations. After plans are...

  1. (abstract) Formal Inspection Technology Transfer Program

    NASA Technical Reports Server (NTRS)

    Welz, Linda A.; Kelly, John C.

    1993-01-01

    A Formal Inspection Technology Transfer Program, based on the inspection process developed by Michael Fagan at IBM, has been developed at JPL. The goal of this program is to support organizations wishing to use Formal Inspections to improve the quality of software and system level engineering products. The Technology Transfer Program provides start-up materials and assistance to help organizations establish their own Formal Inspection program. The course materials and certified instructors associated with the Technology Transfer Program have proven to be effective in classes taught at other NASA centers as well as at JPL. Formal Inspections (NASA tailored Fagan Inspections) are a set of technical reviews whose objective is to increase quality and reduce the cost of software development by detecting and correcting errors early. A primary feature of inspections is the removal of engineering errors before they amplify into larger and more costly problems downstream in the development process. Note that the word 'inspection' is used differently in software than in a manufacturing context. A Formal Inspection is a front-end quality enhancement technique, rather than a task conducted just prior to product shipment for the purpose of sorting defective systems (manufacturing usage). Formal Inspections are supporting and in agreement with the 'total quality' approach being adopted by many NASA centers.

  2. Fate of electroweak vacuum during preheating

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ema, Yohei; Mukaida, Kyohei; Nakayama, Kazunori

    2016-10-28

    Our electroweak vacuum may be metastable in light of the current experimental data of the Higgs/top quark mass. If this is really the case, high-scale inflation models require a stabilization mechanism of our vacuum during inflation. A possible candidate is the Higgs-inflaton/-curvature coupling because it induces an additional mass term to the Higgs during the slow roll regime. However, after inflation, the additional mass term oscillates, and it can destabilize our electroweak vacuum via production of large Higgs fluctuations during the inflaton oscillation era. In this paper, we study whether or not the Higgs-inflaton/-curvature coupling can save our vacuum bymore » properly taking account of Higgs production during the preheating stage. We put upper bounds on the Higgs-inflaton and -curvature couplings, and discuss possible dynamics that might relax them.« less

  3. Steam generator tube inspection in Japan

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Fukui, Shigetaka

    1997-02-01

    Steam generator tube inspection was first carried out in 1971 at Mihama Unit-1 that is first PWR plant in Japan, when the plant was brought into the first annual inspection. At that time, inspection was made on sampling basis, and only bobbin coil probe was used. After experiencing various kinds of tube degradations, inspection method was changed from sampling to all number of tubes, and various kinds of probes were used to get higher detectability of flaw. At present, it is required that all the tubes shall be inspected in their full length at each annual inspection using standard bobbinmore » coil probe, and some special probes for certain plants that have susceptibility of occurrence of flaw. Sleeve repaired portion is included in this inspection. As a result of analyses of eddy current testing data, all indications that have been evaluated to be 20% wall thickness or deeper shall be repaired by either plugging or sleeving, where flaw morphology is to be a wastage or wear. Other types of flaw such as IGA/SCC are not allowed to be left inservice when those indications are detected. These inspections are performed according to inspection procedures that are approved by regulatory authority. Actual inspections are witnessed by the Japan Power engineering and inspection corporation (JAPEIC)`s inspectors during data acquisition and analysis, and they issue inspection report to authority for review and approval. It is achieved high safety performance of steam generator through this method of inspections, however. some tube leakage problems were experienced in the past. To prevent recurrence of such events, government is conducting development and verification test program for new eddy current testing technology.« less

  4. 46 CFR 107.270 - Periodic inspection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Periodic inspection. 107.270 Section 107.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.270 Periodic inspection. (a) Your vessel must undergo a...

  5. 46 CFR 107.270 - Periodic inspection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Periodic inspection. 107.270 Section 107.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.270 Periodic inspection. (a) Your vessel must undergo a...

  6. 46 CFR 107.269 - Annual inspection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Annual inspection. 107.269 Section 107.269 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.269 Annual inspection. (a) Your mobile offshore drilling unit...

  7. 46 CFR 107.270 - Periodic inspection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Periodic inspection. 107.270 Section 107.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.270 Periodic inspection. (a) Your vessel must undergo a...

  8. 46 CFR 107.269 - Annual inspection.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Annual inspection. 107.269 Section 107.269 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.269 Annual inspection. (a) Your mobile offshore drilling unit...

  9. 46 CFR 107.270 - Periodic inspection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Periodic inspection. 107.270 Section 107.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.270 Periodic inspection. (a) Your vessel must undergo a...

  10. 46 CFR 107.269 - Annual inspection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Annual inspection. 107.269 Section 107.269 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.269 Annual inspection. (a) Your mobile offshore drilling unit...

  11. 46 CFR 107.270 - Periodic inspection.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Periodic inspection. 107.270 Section 107.270 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.270 Periodic inspection. (a) Your vessel must undergo a...

  12. 46 CFR 107.269 - Annual inspection.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Annual inspection. 107.269 Section 107.269 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.269 Annual inspection. (a) Your mobile offshore drilling unit...

  13. 46 CFR 107.269 - Annual inspection.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Annual inspection. 107.269 Section 107.269 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.269 Annual inspection. (a) Your mobile offshore drilling unit...

  14. 23 CFR 650.311 - Inspection frequency.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... inspections. (1) Inspect each bridge at regular intervals not to exceed twenty-four months. (2) Certain bridges require inspection at less than twenty-four-month intervals. Establish criteria to determine the... characteristics, and known deficiencies. (3) Certain bridges may be inspected at greater than twenty-four month...

  15. 78 FR 48125 - Inspection, Repair, and Maintenance; Driver-Vehicle Inspection Report

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-08-07

    ... pre- and post-trip inspection lists. DATES: You must submit comments on or before October 7, 2013... pre- and post-trip inspection lists. Benefits and Costs This rule would affect all motor carriers... is appropriate to consider this factor in the decision-making process and request public comment on...

  16. Simulation of the synergistic low Earth orbit effects of vacuum thermal cycling, vacuum UV radiation, and atomic oxygen

    NASA Technical Reports Server (NTRS)

    Dever, Joyce A.; Degroh, Kim K.; Stidham, Curtis R.; Stueber, Thomas J.; Dever, Therese M.; Rodriguez, Elvin; Terlep, Judith A.

    1992-01-01

    In order to assess the low Earth orbit (LEO) durability of candidate space materials, it is necessary to use ground laboratory facilities which provide LEO environmental effects. A facility combining vacuum thermal cycling and vacuum ultraviolet (VUV) radiation has been designed and constructed at NASA Lewis Research Center for this purpose. This facility can also be operated without the VUV lamps. An additional facility can be used to provide VUV exposure only. By utilizing these facilities, followed by atomic oxygen exposure in an RF plasma asher, the effects of the individual vacuum thermal cycling and VUV environments can be compared to the effect of the combined vacuum thermal cycling/VUV environment on the atomic oxygen durability of materials. The synergistic effects of simulated LEO environmental conditions on materials were evaluated by first exposing materials to vacuum thermal cycling, VUV, and vacuum thermal cycling/VUV environments followed by exposure to atomic oxygen in an RP plasma asher. Candidate space power materials such as atomic oxygen protected polyimides and solar concentrator mirrors were evaluated using these facilities. Characteristics of the Vacuum Thermal Cycling/VUV Exposure Facility which simulates the temperature sequences and solar ultraviolet radiation exposure that would be experienced by a spacecraft surface in LEO are discussed. Results of durability evaluations of some candidate space power materials to the simulated LEO environmental conditions will also be discussed. Such results have indicated that for some materials, atomic oxygen durability is affected by previous exposure to thermal cycling and/or VUV exposure.

  17. Nearly Seamless Vacuum-Insulated Boxes

    NASA Technical Reports Server (NTRS)

    Stepanian, Christopher J.; Ou, Danny; Hu, Xiangjun

    2010-01-01

    A design concept, and a fabrication process that would implement the design concept, have been proposed for nearly seamless vacuum-insulated boxes that could be the main structural components of a variety of controlled-temperature containers, including common household refrigerators and insulating containers for shipping foods. In a typical case, a vacuum-insulated box would be shaped like a rectangular parallelepiped conventional refrigerator box having five fully closed sides and a hinged door on the sixth side. Although it is possible to construct the five-closed-side portion of the box as an assembly of five unitary vacuum-insulated panels, it is not desirable to do so because the relatively high thermal conductances of the seams between the panels would contribute significant amounts of heat leakage, relative to the leakage through the panels themselves. In contrast, the proposal would make it possible to reduce heat leakage by constructing the five-closed-side portion of the box plus the stationary portion (if any) of the sixth side as a single, seamless unit; the only remaining seam would be the edge seal around the door. The basic cross-sectional configuration of each side of a vacuum-insulated box according to the proposal would be that of a conventional vacuum-insulated panel: a low-density, porous core material filling a partially evacuated space between face sheets. However, neither the face sheets nor the core would be conventional. The face sheets would be opposite sides of a vacuum bag. The core material would be a flexible polymer-modified silica aerogel of the type described in Silica/Polymer and Silica/Polymer/Fiber Composite Aero - gels (MSC-23736) in this issue of NASA Tech Briefs. As noted in that article, the stiffness of this core material against compression is greater than that of prior aerogels. This is an important advantage because it translates to greater retention of thickness and, hence, of insulation performance when pressure is

  18. Automated Telerobotic Inspection Of Surfaces

    NASA Technical Reports Server (NTRS)

    Balaram, J.; Prasad, K. Venkatesh

    1996-01-01

    Method of automated telerobotic inspection of surfaces undergoing development. Apparatus implementing method includes video camera that scans over surfaces to be inspected, in manner of mine detector. Images of surfaces compared with reference images to detect flaws. Developed for inspecting external structures of Space Station Freedom for damage from micrometeorites and debris from prior artificial satellites. On Earth, applied to inspection for damage, missing parts, contamination, and/or corrosion on interior surfaces of pipes or exterior surfaces of bridges, towers, aircraft, and ships.

  19. 46 CFR 107.275 - Other inspections.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... 46 Shipping 4 2011-10-01 2011-10-01 false Other inspections. 107.275 Section 107.275 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.275 Other inspections. When the Coast Guard receives the report...

  20. 46 CFR 107.275 - Other inspections.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... 46 Shipping 4 2012-10-01 2012-10-01 false Other inspections. 107.275 Section 107.275 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.275 Other inspections. When the Coast Guard receives the report...

  1. 46 CFR 107.275 - Other inspections.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... 46 Shipping 4 2010-10-01 2010-10-01 false Other inspections. 107.275 Section 107.275 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.275 Other inspections. When the Coast Guard receives the report...

  2. 46 CFR 107.275 - Other inspections.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... 46 Shipping 4 2013-10-01 2013-10-01 false Other inspections. 107.275 Section 107.275 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.275 Other inspections. When the Coast Guard receives the report...

  3. 46 CFR 107.275 - Other inspections.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... 46 Shipping 4 2014-10-01 2014-10-01 false Other inspections. 107.275 Section 107.275 Shipping COAST GUARD, DEPARTMENT OF HOMELAND SECURITY (CONTINUED) A-MOBILE OFFSHORE DRILLING UNITS INSPECTION AND CERTIFICATION Inspection and Certification § 107.275 Other inspections. When the Coast Guard receives the report...

  4. 36 CFR 64.14 - Project inspections.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 36 Parks, Forests, and Public Property 1 2010-07-01 2010-07-01 false Project inspections. 64.14... Project inspections. All State and local projects will receive a final inspection by the Bureau. Final... as deemed necessary by the Bureau. Preapproval inspections will also be conducted prior to project...

  5. 36 CFR 64.14 - Project inspections.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... 36 Parks, Forests, and Public Property 1 2014-07-01 2014-07-01 false Project inspections. 64.14... Project inspections. All State and local projects will receive a final inspection by the Bureau. Final... as deemed necessary by the Bureau. Preapproval inspections will also be conducted prior to project...

  6. 36 CFR 64.14 - Project inspections.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 36 Parks, Forests, and Public Property 1 2011-07-01 2011-07-01 false Project inspections. 64.14... Project inspections. All State and local projects will receive a final inspection by the Bureau. Final... as deemed necessary by the Bureau. Preapproval inspections will also be conducted prior to project...

  7. 36 CFR 64.14 - Project inspections.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... 36 Parks, Forests, and Public Property 1 2012-07-01 2012-07-01 false Project inspections. 64.14... Project inspections. All State and local projects will receive a final inspection by the Bureau. Final... as deemed necessary by the Bureau. Preapproval inspections will also be conducted prior to project...

  8. Compact vacuum insulation

    DOEpatents

    Benson, D.K.; Potter, T.F.

    1993-01-05

    An ultra-thin compact vacuum insulation panel is comprised of two hard, but bendable metal wall sheets closely spaced apart from each other and welded around the edges to enclose a vacuum chamber. Glass or ceramic spacers hold the wall sheets apart. The spacers can be discrete spherical beads or monolithic sheets of glass or ceramic webs with nodules protruding therefrom to form essentially point'' or line'' contacts with the metal wall sheets. In the case of monolithic spacers that form line'' contacts, two such spacers with the line contacts running perpendicular to each other form effectively point'' contacts at the intersections. Corrugations accommodate bending and expansion, tubular insulated pipes and conduits, and preferred applications are also included.

  9. Compact vacuum insulation

    DOEpatents

    Benson, David K.; Potter, Thomas F.

    1993-01-01

    An ultra-thin compact vacuum insulation panel is comprised of two hard, but bendable metal wall sheets closely spaced apart from each other and welded around the edges to enclose a vacuum chamber. Glass or ceramic spacers hold the wall sheets apart. The spacers can be discrete spherical beads or monolithic sheets of glass or ceramic webs with nodules protruding therefrom to form essentially "point" or "line" contacts with the metal wall sheets. In the case of monolithic spacers that form "line" contacts, two such spacers with the line contacts running perpendicular to each other form effectively "point" contacts at the intersections. Corrugations accommodate bending and expansion, tubular insulated pipes and conduits, and preferred applications are also included.

  10. Investigating steam penetration using thermometric methods in dental handpieces with narrow internal lumens during sterilizing processes with non-vacuum or vacuum processes.

    PubMed

    Winter, S; Smith, A; Lappin, D; McDonagh, G; Kirk, B

    2017-12-01

    Dental handpieces are required to be sterilized between patient use. Vacuum steam sterilization processes with fractionated pre/post-vacuum phases or unique cycles for specified medical devices are required for hollow instruments with internal lumens to assure successful air removal. Entrapped air will compromise achievement of required sterilization conditions. Many countries and professional organizations still advocate non-vacuum sterilization processes for these devices. To investigate non-vacuum downward/gravity displacement, type-N steam sterilization of dental handpieces, using thermometric methods to measure time to achieve sterilization temperature at different handpiece locations. Measurements at different positions within air turbines were undertaken with thermocouples and data loggers. Two examples of widely used UK benchtop steam sterilizers were tested: a non-vacuum benchtop sterilizer (Little Sister 3; Eschmann, Lancing, UK) and a vacuum benchtop sterilizer (Lisa; W&H, Bürmoos, Austria). Each sterilizer cycle was completed with three handpieces and each cycle in triplicate. A total of 140 measurements inside dental handpiece lumens were recorded. The non-vacuum process failed (time range: 0-150 s) to reliably achieve sterilization temperatures within the time limit specified by the international standard (15 s equilibration time). The measurement point at the base of the handpiece failed in all test runs (N = 9) to meet the standard. No failures were detected with the vacuum steam sterilization type B process with fractionated pre-vacuum and post-vacuum phases. Non-vacuum downward/gravity displacement, type-N steam sterilization processes are unreliable in achieving sterilization conditions inside dental handpieces, and the base of the handpiece is the site most likely to fail. Copyright © 2017 The Healthcare Infection Society. Published by Elsevier Ltd. All rights reserved.

  11. 30 CFR 27.30 - Inspection.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... 30 Mineral Resources 1 2010-07-01 2010-07-01 false Inspection. 27.30 Section 27.30 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS Test Requirements § 27.30 Inspection. A detailed inspection...

  12. Flexible ultrasonic pipe inspection apparatus

    DOEpatents

    Jenkins, C.F.; Howard, B.D.

    1994-01-01

    Pipe crawlers, pipe inspection {open_quotes}rabbits{close_quotes} and similar vehicles are widely used for inspecting the interior surfaces of piping systems, storage tanks and process vessels for damaged or flawed structural features. This paper describes the design of a flexible, modular ultrasonic pipe inspection apparatus.

  13. 30 CFR 27.30 - Inspection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 30 Mineral Resources 1 2011-07-01 2011-07-01 false Inspection. 27.30 Section 27.30 Mineral Resources MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR TESTING, EVALUATION, AND APPROVAL OF MINING PRODUCTS METHANE-MONITORING SYSTEMS Test Requirements § 27.30 Inspection. A detailed inspection...

  14. Device Rotates Bearing Balls For Inspection

    NASA Technical Reports Server (NTRS)

    Burley, R. K.

    1988-01-01

    Entire surface of ball inspected automatically and quickly. Device holds and rotates bearing ball for inspection by optical or mechanical surface-quality probe, eddy-current probe for detection of surface or subsurface defects, or circumference-measuring tool. Ensures entire surface of ball moves past inspection head quickly. New device saves time and increases reliability of inspections of spherical surfaces. Simple to operate and provides quick and easy access for loading and unloading of balls during inspection.

  15. Remote surface inspection system

    NASA Astrophysics Data System (ADS)

    Hayati, S.; Balaram, J.; Seraji, H.; Kim, W. S.; Tso, K.; Prasad, V.

    1993-02-01

    This paper reports on an on-going research and development effort in remote surface inspection of space platforms such as the Space Station Freedom (SSF). It describes the space environment and identifies the types of damage for which to search. This paper provides an overview of the Remote Surface Inspection System that was developed to conduct proof-of-concept demonstrations and to perform experiments in a laboratory environment. Specifically, the paper describes three technology areas: (1) manipulator control for sensor placement; (2) automated non-contact inspection to detect and classify flaws; and (3) an operator interface to command the system interactively and receive raw or processed sensor data. Initial findings for the automated and human visual inspection tests are reported.

  16. Remote surface inspection system

    NASA Technical Reports Server (NTRS)

    Hayati, S.; Balaram, J.; Seraji, H.; Kim, W. S.; Tso, K.; Prasad, V.

    1993-01-01

    This paper reports on an on-going research and development effort in remote surface inspection of space platforms such as the Space Station Freedom (SSF). It describes the space environment and identifies the types of damage for which to search. This paper provides an overview of the Remote Surface Inspection System that was developed to conduct proof-of-concept demonstrations and to perform experiments in a laboratory environment. Specifically, the paper describes three technology areas: (1) manipulator control for sensor placement; (2) automated non-contact inspection to detect and classify flaws; and (3) an operator interface to command the system interactively and receive raw or processed sensor data. Initial findings for the automated and human visual inspection tests are reported.

  17. Study on convection improvement of standard vacuum tube

    NASA Astrophysics Data System (ADS)

    He, J. H.; Du, W. P.; Qi, R. R.; He, J. X.

    2017-11-01

    For the standard all-glass vacuum tube collector, enhancing the vacuum tube axial natural convection can improve its thermal efficiency. According to the study of the standard all-glass vacuum tube, three kinds of guide plates which can inhibit the radial convection and increase axial natural convection are designed, and theory model is established. Experiments were carried out on vacuum tubes with three types of baffles and standard vacuum tubes without the improvement. The results show that T-type guide plate is better than that of Y-type guide plate on restraining convection and increasing axial radial convection effect, Y type is better than that of flat plate type, all guide plates are better than no change; the thermal efficiency of the tube was 2.6% higher than that of the unmodified standard vacuum tube. The efficiency of the system in the experiment can be increased by 3.1%.

  18. 21 CFR 864.9125 - Vacuum-assisted blood collection system.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 21 Food and Drugs 8 2010-04-01 2010-04-01 false Vacuum-assisted blood collection system. 864.9125... Blood and Blood Products § 864.9125 Vacuum-assisted blood collection system. (a) Identification. A vacuum-assisted blood collection system is a device intended for medical purposes that uses a vacuum to...

  19. 21 CFR 864.9125 - Vacuum-assisted blood collection system.

    Code of Federal Regulations, 2013 CFR

    2013-04-01

    ... 21 Food and Drugs 8 2013-04-01 2013-04-01 false Vacuum-assisted blood collection system. 864.9125... Blood and Blood Products § 864.9125 Vacuum-assisted blood collection system. (a) Identification. A vacuum-assisted blood collection system is a device intended for medical purposes that uses a vacuum to...

  20. 21 CFR 864.9125 - Vacuum-assisted blood collection system.

    Code of Federal Regulations, 2014 CFR

    2014-04-01

    ... 21 Food and Drugs 8 2014-04-01 2014-04-01 false Vacuum-assisted blood collection system. 864.9125... Blood and Blood Products § 864.9125 Vacuum-assisted blood collection system. (a) Identification. A vacuum-assisted blood collection system is a device intended for medical purposes that uses a vacuum to...

  1. 21 CFR 864.9125 - Vacuum-assisted blood collection system.

    Code of Federal Regulations, 2012 CFR

    2012-04-01

    ... 21 Food and Drugs 8 2012-04-01 2012-04-01 false Vacuum-assisted blood collection system. 864.9125... Blood and Blood Products § 864.9125 Vacuum-assisted blood collection system. (a) Identification. A vacuum-assisted blood collection system is a device intended for medical purposes that uses a vacuum to...

  2. 21 CFR 864.9125 - Vacuum-assisted blood collection system.

    Code of Federal Regulations, 2011 CFR

    2011-04-01

    ... 21 Food and Drugs 8 2011-04-01 2011-04-01 false Vacuum-assisted blood collection system. 864.9125... Blood and Blood Products § 864.9125 Vacuum-assisted blood collection system. (a) Identification. A vacuum-assisted blood collection system is a device intended for medical purposes that uses a vacuum to...

  3. Vacuum decay container closure integrity leak test method development and validation for a lyophilized product-package system.

    PubMed

    Patel, Jayshree; Mulhall, Brian; Wolf, Heinz; Klohr, Steven; Guazzo, Dana Morton

    2011-01-01

    A leak test performed according to ASTM F2338-09 Standard Test Method for Nondestructive Detection of Leaks in Packages by Vacuum Decay Method was developed and validated for container-closure integrity verification of a lyophilized product in a parenteral vial package system. This nondestructive leak test method is intended for use in manufacturing as an in-process package integrity check, and for testing product stored on stability in lieu of sterility tests. Method development and optimization challenge studies incorporated artificially defective packages representing a range of glass vial wall and sealing surface defects, as well as various elastomeric stopper defects. Method validation required 3 days of random-order replicate testing of a test sample population of negative-control, no-defect packages and positive-control, with-defect packages. Positive-control packages were prepared using vials each with a single hole laser-drilled through the glass vial wall. Hole creation and hole size certification was performed by Lenox Laser. Validation study results successfully demonstrated the vacuum decay leak test method's ability to accurately and reliably detect those packages with laser-drilled holes greater than or equal to approximately 5 μm in nominal diameter. All development and validation studies were performed at Whitehouse Analytical Laboratories in Whitehouse, NJ, under the direction of consultant Dana Guazzo of RxPax, LLC, using a VeriPac 455 Micro Leak Test System by Packaging Technologies & Inspection (Tuckahoe, NY). Bristol Myers Squibb (New Brunswick, NJ) fully subsidized all work. A leak test performed according to ASTM F2338-09 Standard Test Method for Nondestructive Detection of Leaks in Packages by Vacuum Decay Method was developed and validated to detect defects in stoppered vial packages containing lyophilized product for injection. This nondestructive leak test method is intended for use in manufacturing as an in-process package integrity

  4. 10 CFR 76.121 - Inspections.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... REGULATORY COMMISSION (CONTINUED) CERTIFICATION OF GASEOUS DIFFUSION PLANTS Reports and Inspections § 76.121 Inspections. (a) The Corporation shall afford to the Commission opportunity to inspect the premises and plants... the Corporation. The office must be convenient to and have full access to the plant, and must provide...

  5. 7 CFR 654.17 - Inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... AGRICULTURE SUPPORT ACTIVITIES OPERATION AND MAINTENANCE Federal Financially-Assisted Projects § 654.17 Inspection. (a) Sponsor(s) are to make periodic and special inspections of installed project measures as provided in the plan of O&M. For structural measures, inspections are to be made at least annually and...

  6. 14 CFR 25.1433 - Vacuum systems.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 14 Aeronautics and Space 1 2014-01-01 2014-01-01 false Vacuum systems. 25.1433 Section 25.1433 Aeronautics and Space FEDERAL AVIATION ADMINISTRATION, DEPARTMENT OF TRANSPORTATION AIRCRAFT AIRWORTHINESS STANDARDS: TRANSPORT CATEGORY AIRPLANES Equipment Miscellaneous Equipment § 25.1433 Vacuum systems. There...

  7. 9 CFR 592.400 - Who may request an appeal inspection or review of an inspection program employee's decision.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 9 Animals and Animal Products 2 2013-01-01 2013-01-01 false Who may request an appeal inspection or review of an inspection program employee's decision. 592.400 Section 592.400 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Appeals § 592.400...

  8. 9 CFR 592.400 - Who may request an appeal inspection or review of an inspection program employee's decision.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 9 Animals and Animal Products 2 2014-01-01 2014-01-01 false Who may request an appeal inspection or review of an inspection program employee's decision. 592.400 Section 592.400 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Appeals § 592.400...

  9. 9 CFR 592.400 - Who may request an appeal inspection or review of an inspection program employee's decision.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 9 Animals and Animal Products 2 2011-01-01 2011-01-01 false Who may request an appeal inspection or review of an inspection program employee's decision. 592.400 Section 592.400 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Appeals § 592.400...

  10. 9 CFR 592.400 - Who may request an appeal inspection or review of an inspection program employee's decision.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 9 Animals and Animal Products 2 2012-01-01 2012-01-01 false Who may request an appeal inspection or review of an inspection program employee's decision. 592.400 Section 592.400 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY INSPECTION OF EGG PRODUCTS Appeals § 592.400...

  11. Plates for vacuum thermal fusion

    DOEpatents

    Davidson, James C.; Balch, Joseph W.

    2002-01-01

    A process for effectively bonding arbitrary size or shape substrates. The process incorporates vacuum pull down techniques to ensure uniform surface contact during the bonding process. The essence of the process for bonding substrates, such as glass, plastic, or alloys, etc., which have a moderate melting point with a gradual softening point curve, involves the application of an active vacuum source to evacuate interstices between the substrates while at the same time providing a positive force to hold the parts to be bonded in contact. This enables increasing the temperature of the bonding process to ensure that the softening point has been reached and small void areas are filled and come in contact with the opposing substrate. The process is most effective where at least one of the two plates or substrates contain channels or grooves that can be used to apply vacuum between the plates or substrates during the thermal bonding cycle. Also, it is beneficial to provide a vacuum groove or channel near the perimeter of the plates or substrates to ensure bonding of the perimeter of the plates or substrates and reduce the unbonded regions inside the interior region of the plates or substrates.

  12. Researches on Position Detection for Vacuum Switch Electrode

    NASA Astrophysics Data System (ADS)

    Dong, Huajun; Guo, Yingjie; Li, Jie; Kong, Yihan

    2018-03-01

    Form and transformation character of vacuum arc is important influencing factor on the vacuum switch performance, and the dynamic separations of electrode is the chief effecting factor on the transformation of vacuum arcs forms. Consequently, how to detect the position of electrode to calculate the separations in the arcs image is of great significance. However, gray level distribution of vacuum arcs image isn’t even, the gray level of burning arcs is high, but the gray level of electrode is low, meanwhile, the forms of vacuum arcs changes sharply, the problems above restrict electrode position detection precisely. In this paper, algorithm of detecting electrode position base on vacuum arcs image was proposed. The digital image processing technology was used in vacuum switch arcs image analysis, the upper edge and lower edge were detected respectively, then linear fitting was done using the result of edge detection, the fitting result was the position of electrode, thus, accurate position detection of electrode was realized. From the experimental results, we can see that: algorithm described in this paper detected upper and lower edge of arcs successfully and the position of electrode was obtained through calculation.

  13. Advanced Photon Source accelerator ultrahigh vacuum guide

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Liu, C.; Noonan, J.

    1994-03-01

    In this document the authors summarize the following: (1) an overview of basic concepts of ultrahigh vacuum needed for the APS project, (2) a description of vacuum design and calculations for major parts of APS, including linac, linac waveguide, low energy undulator test line, positron accumulator ring (PAR), booster synchrotron ring, storage ring, and insertion devices, and (3) cleaning procedures of ultrahigh vacuum (UHV) components presently used at APS.

  14. Ceramic vacuum tubes for geothermal well logging

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Kelly, R.D.

    1977-01-01

    Useful design data acquired in the evaluation of ceramic vacuum tubes for the development of a 500/sup 0/C instrumentation amplifier are presented. The general requirements for ceramic vacuum tubes are discussed for application to the development of high temperature well logs. Commercially available tubes are described and future contract activities that specifically relate to ceramic vacuum tubes are detailed. Supplemental data are presented in the appendix.

  15. 46 CFR 105.10-20 - Pressure vacuum relief valve.

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... Pressure vacuum relief valve. (a) The term pressure vacuum relief valve means any device or assembly of a mechanical, liquid, weight, or other type used for the automatic regulation of pressure or vacuum in enclosed... 46 Shipping 4 2011-10-01 2011-10-01 false Pressure vacuum relief valve. 105.10-20 Section 105.10...

  16. 46 CFR 105.10-20 - Pressure vacuum relief valve.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... Pressure vacuum relief valve. (a) The term pressure vacuum relief valve means any device or assembly of a mechanical, liquid, weight, or other type used for the automatic regulation of pressure or vacuum in enclosed... 46 Shipping 4 2010-10-01 2010-10-01 false Pressure vacuum relief valve. 105.10-20 Section 105.10...

  17. 46 CFR 105.10-20 - Pressure vacuum relief valve.

    Code of Federal Regulations, 2014 CFR

    2014-10-01

    ... Pressure vacuum relief valve. (a) The term pressure vacuum relief valve means any device or assembly of a mechanical, liquid, weight, or other type used for the automatic regulation of pressure or vacuum in enclosed... 46 Shipping 4 2014-10-01 2014-10-01 false Pressure vacuum relief valve. 105.10-20 Section 105.10...

  18. 46 CFR 105.10-20 - Pressure vacuum relief valve.

    Code of Federal Regulations, 2012 CFR

    2012-10-01

    ... Pressure vacuum relief valve. (a) The term pressure vacuum relief valve means any device or assembly of a mechanical, liquid, weight, or other type used for the automatic regulation of pressure or vacuum in enclosed... 46 Shipping 4 2012-10-01 2012-10-01 false Pressure vacuum relief valve. 105.10-20 Section 105.10...

  19. 46 CFR 105.10-20 - Pressure vacuum relief valve.

    Code of Federal Regulations, 2013 CFR

    2013-10-01

    ... Pressure vacuum relief valve. (a) The term pressure vacuum relief valve means any device or assembly of a mechanical, liquid, weight, or other type used for the automatic regulation of pressure or vacuum in enclosed... 46 Shipping 4 2013-10-01 2013-10-01 false Pressure vacuum relief valve. 105.10-20 Section 105.10...

  20. Automated Inspection of Aircraft

    DOT National Transportation Integrated Search

    1998-04-01

    This report summarizes the development of a robotic system designed to assist aircraft inspectors by remotely deploying non-destructive inspection (NDI) sensors and acquiring, processing, and storing inspection data. Carnegie Mellon University studie...

  1. 9 CFR 352.7 - Marking inspected products.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... Section 352.7 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE..., the inspection mark applied to inspected and passed exotic animal carcasses, meat or meat food... abbreviations shall have the same force and effect as the inspection mark. The inspection mark or approved...

  2. 9 CFR 352.7 - Marking inspected products.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... Section 352.7 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE..., the inspection mark applied to inspected and passed exotic animal carcasses, meat or meat food... abbreviations shall have the same force and effect as the inspection mark. The inspection mark or approved...

  3. 9 CFR 352.7 - Marking inspected products.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... Section 352.7 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE..., the inspection mark applied to inspected and passed exotic animal carcasses, meat or meat food... abbreviations shall have the same force and effect as the inspection mark. The inspection mark or approved...

  4. 7 CFR 58.913 - Evaporators and vacuum pans.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Evaporators and vacuum pans. 58.913 Section 58.913....913 Evaporators and vacuum pans. All equipment used in the removal of moisture from milk or milk... Sanitary Standards for Milk and Milk Products Evaporators and Vacuum Pans. ...

  5. 7 CFR 58.913 - Evaporators and vacuum pans.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... 7 Agriculture 3 2014-01-01 2014-01-01 false Evaporators and vacuum pans. 58.913 Section 58.913....913 Evaporators and vacuum pans. All equipment used in the removal of moisture from milk or milk... Sanitary Standards for Milk and Milk Products Evaporators and Vacuum Pans. ...

  6. 7 CFR 58.913 - Evaporators and vacuum pans.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Evaporators and vacuum pans. 58.913 Section 58.913....913 Evaporators and vacuum pans. All equipment used in the removal of moisture from milk or milk... Sanitary Standards for Milk and Milk Products Evaporators and Vacuum Pans. ...

  7. 7 CFR 58.913 - Evaporators and vacuum pans.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... 7 Agriculture 3 2013-01-01 2013-01-01 false Evaporators and vacuum pans. 58.913 Section 58.913....913 Evaporators and vacuum pans. All equipment used in the removal of moisture from milk or milk... Sanitary Standards for Milk and Milk Products Evaporators and Vacuum Pans. ...

  8. 7 CFR 58.913 - Evaporators and vacuum pans.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... 7 Agriculture 3 2012-01-01 2012-01-01 false Evaporators and vacuum pans. 58.913 Section 58.913....913 Evaporators and vacuum pans. All equipment used in the removal of moisture from milk or milk... Sanitary Standards for Milk and Milk Products Evaporators and Vacuum Pans. ...

  9. Introduce Construction Technology through Home Inspection

    ERIC Educational Resources Information Center

    Wiggins, Enrique R.

    2007-01-01

    Introducing technology education students to the field of home inspection gives them a great opportunity to learn about and apply construction technology content. In working with his 8th-grade students, the author covers the purpose of a home inspection, the dynamic of home inspections, the process involved in inspecting schools and homes and…

  10. Leak Rate Test for a Fiber Beam Monitor Contained in a Vacuum for the Muon g-2 Experiment

    NASA Astrophysics Data System (ADS)

    O'Mara, Bridget; Lane, Noel; Gross, Eisen; Gray, Frederick; Muon g-2 Collaboration

    2014-09-01

    The muon g-2 experiment at Fermilab aims to measure the muon anomalous magnetic moment with a precision of 0.14 parts per million (ppm). The measurement will build on the Brookhaven-based E821 experiment, which yielded results suggesting new physics such as supersymmetry. The Fiber Beam Monitors (FBMs) are used in the experiment to determine the position and observe the motion of a muon beam and monitor the properties of the beam over time. The FBMs support a 9 cm × 8 cm ``harp'' with 7 scintillating fibers separated from each other by 13 mm, each with a diameter of 0.5 mm. The experiment requires a vacuum of less than 1 ×10-6 Torr to prevent trapping of electrons ionized from the residual gas by the electrostatic quadrupoles. To meet this requirement the FBMs must have a leak rate of less than 5 ×10-5 Torr L/s. We have constructed a vacuum system to simulate these conditions and have determined the leak rate of the FBMs within the constructed vacuum apparatus. This leak rate will be reported, along with preliminary results from tests of the light output from the scintillating fibers. The muon g-2 experiment at Fermilab aims to measure the muon anomalous magnetic moment with a precision of 0.14 parts per million (ppm). The measurement will build on the Brookhaven-based E821 experiment, which yielded results suggesting new physics such as supersymmetry. The Fiber Beam Monitors (FBMs) are used in the experiment to determine the position and observe the motion of a muon beam and monitor the properties of the beam over time. The FBMs support a 9 cm × 8 cm ``harp'' with 7 scintillating fibers separated from each other by 13 mm, each with a diameter of 0.5 mm. The experiment requires a vacuum of less than 1 ×10-6 Torr to prevent trapping of electrons ionized from the residual gas by the electrostatic quadrupoles. To meet this requirement the FBMs must have a leak rate of less than 5 ×10-5 Torr L/s. We have constructed a vacuum system to simulate these conditions

  11. Vacuum coupling of rotating superconducting rotor

    DOEpatents

    Shoykhet, Boris A.; Zhang, Burt Xudong; Driscoll, David Infante

    2003-12-02

    A rotating coupling allows a vacuum chamber in the rotor of a superconducting electric motor to be continually pumped out. The coupling consists of at least two concentric portions, one of which is allowed to rotate and the other of which is stationary. The coupling is located on the non-drive end of the rotor and is connected to a coolant supply and a vacuum pump. The coupling is smaller in diameter than the shaft of the rotor so that the shaft can be increased in diameter without having to increase the size of the vacuum seal.

  12. 7 CFR 927.60 - Inspection and certification.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... WASHINGTON Order Regulating Handling Inspection § 927.60 Inspection and certification. (a) Handlers shall ship only fresh pears inspected by the Federal-State Inspection Service or under a program developed by... 7 Agriculture 8 2010-01-01 2010-01-01 false Inspection and certification. 927.60 Section 927.60...

  13. 15 CFR 717.5 - Post-inspection activities.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CLARIFICATION PROCEDURES (CONSULTATIONS AND CHALLENGE INSPECTIONS) § 717.5 Post-inspection activities. BIS will forward a copy of the final inspection report to the inspected facility for their review upon receipt from the OPCW. Facilities may submit comments on the final inspection report to BIS, and BIS will consider...

  14. Nuclear Technology. Course 30: Mechanical Inspection. Module 30-1, Pump Inspection.

    ERIC Educational Resources Information Center

    Wasil, Ed; Espy, John

    This first in a series of eight modules for a course titled Mechanical Inspection describes the type of pumps used in nuclear power plant systems, the basic operating principles of each type, and the inspection activities performed by the quality assurance/quality control technician. The module follows a typical format that includes the following…

  15. 40 CFR 264.174 - Inspections.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... Containers § 264.174 Inspections. At least weekly, the owner or operator must inspect areas where containers are stored, except for Performance Track member facilities, that may conduct inspections at least once... Track member facility must follow the procedures identified in § 264.15(b)(5) of this part. The owner or...

  16. 40 CFR 264.174 - Inspections.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... Containers § 264.174 Inspections. At least weekly, the owner or operator must inspect areas where containers are stored, except for Performance Track member facilities, that may conduct inspections at least once... Track member facility must follow the procedures identified in § 264.15(b)(5) of this part. The owner or...

  17. 40 CFR 264.174 - Inspections.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... Containers § 264.174 Inspections. At least weekly, the owner or operator must inspect areas where containers are stored, except for Performance Track member facilities, that may conduct inspections at least once... Track member facility must follow the procedures identified in § 264.15(b)(5) of this part. The owner or...

  18. 40 CFR 264.174 - Inspections.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... Containers § 264.174 Inspections. At least weekly, the owner or operator must inspect areas where containers are stored, except for Performance Track member facilities, that may conduct inspections at least once... Track member facility must follow the procedures identified in § 264.15(b)(5) of this part. The owner or...

  19. 40 CFR 264.174 - Inspections.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... Containers § 264.174 Inspections. At least weekly, the owner or operator must inspect areas where containers are stored, except for Performance Track member facilities, that may conduct inspections at least once... Track member facility must follow the procedures identified in § 264.15(b)(5) of this part. The owner or...

  20. Effect of Grinding at Modified Atmosphere or Vacuum on Browning, Antioxidant Capacities, and Oxidative Enzyme Activities of Apple.

    PubMed

    Kim, Ah-Na; Lee, Kyo-Yeon; Kim, Hyun-Jin; Chun, Jiyeon; Kerr, William L; Choi, Sung-Gil

    2018-01-01

    This study evaluated the effects of grinding at atmospheric pressure (control), under vacuum (∼2.67 kPa), or with modified atmosphere (N 2 and CO 2 ) on the browning, antioxidant activity, phenolics, and oxidative enzyme activity of apples as a function of time. The control group was affected most, showing distinct browning and losing most of the antioxidant activity and concentrations of the main phenolic compounds. The modified atmosphere groups retained color, antioxidant activity, and phenolic compounds better than the control group. Least changes were obtained with vacuum grinding, particularly in terms of preventing enzymatic browning and oxidation of antioxidants apples. At 12 h after grinding, vacuum-ground apples retained total phenolic contents 5.32, 1.54, and 1.49 times higher than control, nitrogen gas, and carbon dioxide gas-ground samples, respectively. The oxidative enzyme activity, including that of polyphenol oxidase and peroxidase, decreased in the control and modified atmosphere group, but they were maintained in the samples ground under the vacuum. In this study, we found that grinding with modified atmosphere or vacuum conditions could effectively prevent browning as well as loss of phenolic compounds and antioxidant activity of ground apples. These results can help scientists and engineers build better grinding systems for retaining nutrient and quality factors of ground apples. In addition, these results may be useful to other fruit and vegetable industries that wish to retain fresh-like quality and nutritional value during grinding and storage. © 2017 Institute of Food Technologists®.

  1. 7 CFR 800.156 - Official inspection records.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... performed the inspection. (b) Inspection logs. The record of an official inspection service for grain in a combined lot and shiplot shall include the official inspection log as prescribed in the instructions. The original copy of each inspection log shall be retained by the agency or field office that performed the...

  2. 7 CFR 800.156 - Official inspection records.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... performed the inspection. (b) Inspection logs. The record of an official inspection service for grain in a combined lot and shiplot shall include the official inspection log as prescribed in the instructions. The original copy of each inspection log shall be retained by the agency or field office that performed the...

  3. [A report on the inspection of the Shinkansen Multiple Inspection Train].

    PubMed

    Niijima, Kuniyuki; Enta, Kazuhiko; Sashihara, Shunsuke

    2003-03-01

    The multiple inspection train nicknamed "Doctor Yellow" is capable of taking necessary measurements of the track and electrical facilities, and maintains the safety and reliability of the Tokaido Shinkansen corridor. We performed a workplace inspection to examine environmental conditions in this train. The workers were engaged in VDT (visual display terminal) work including the inspection task. The labor environments such as vibration, noise, temperature and lighting, were comfortable. However, some of the working conditions while the Bullet train is running are inevitably restricted. The occupational physicians of the Central Japan Railway Company are expected to play important roles in providing effective health management for the employees under the characteristic work environments on the railroad.

  4. STS-75 Mission Cmdr Andrew Allen inspects SPREE in O&C

    NASA Technical Reports Server (NTRS)

    1995-01-01

    STS-75 Mission Commander Andrew Allen inspects the Shuttle Potential and Return Experiment (SPRE) that will fly on his mission in the Operations and Checkout (O&C) Building. This 14- day mission is now scheduled for early 1996 aboard the Space Shuttle Orbiter Columbia. The primary payloads are the Tethered Satellite System-1R (TSS-1R) and the U.S. Microgravity Payload-3 (USMP-3). The 'R' designation indicates a reflight of the TSS-1. It originally flew on STS-46 in July 1992 but achieved only partial success.

  5. In-Vacuum Dissociator for Atomic-Hydrogen Masers

    NASA Technical Reports Server (NTRS)

    Vessot, R. F.

    1987-01-01

    Thermal control and vacuum sealing achieved while contamination avoided. Simple, relatively inexpensive molecular-hydrogen dissociator for atomic-hydrogen masers used on Earth or in vacuum of space. No air cooling required, and absence of elastomeric O-ring seals prevents contamination. In-vacuum dissociator for atomic hydrogen masers, hydrogen gas in glass dissociator dissociated by radio-frequency signal transmitted from surrounding 3-turn coil. Heat in glass conducted away by contacting metal surfaces.

  6. Vacuum-jacketed transfer line installation technique

    NASA Technical Reports Server (NTRS)

    Bowers, W. M.

    1968-01-01

    Rolling-type spacers in the form of steel balls retained in appropriate sleeves affixed at intervals to the exterior of the transfer line facilitate the installation of a vacuum-jacketed line. They act as standoffs to position the transfer line concentrically within the vacuum jacket line.

  7. Thermodynamic performance of multi-stage gradational lead screw vacuum pump

    NASA Astrophysics Data System (ADS)

    Zhao, Fan; Zhang, Shiwei; Sun, Kun; Zhang, Zhijun

    2018-02-01

    As a kind of dry mechanical vacuum pump, the twin-screw vacuum pump has an outstanding pumping performance during operation, widely used in the semiconductor industry. Compared with the constant lead screw (CLS) vacuum pump, the gradational lead screw (GLS) vacuum pump is more popularly applied in recent years. Nevertheless, not many comparative studies on the thermodynamic performance of GLS vacuum pump can be found in the literature. Our study focuses on one type of GLS vacuum pump, the multi-stage gradational lead screw (MGLS) vacuum pump, gives a detailed description of its construction and illustrates it with the drawing. Based on the structural analysis, the thermodynamic procedure is divided into four distinctive processes, including sucking process, transferring (compressing) process, backlashing process and exhausting process. The internal mechanism of each process is qualitatively illustrated and the mathematical expressions of seven thermodynamic parameters are given under the ideal situation. The performance curves of MGLS vacuum pump are plotted by MATLAB software and compared with those of the CLS vacuum pump in the same case. The results can well explain why the MGLS vacuum pump has more favorable pumping performance than the CLS vacuum pump in saving energy, reducing noise and heat dissipation.

  8. Vacuum tool manipulator

    DOEpatents

    Zollinger, William T.

    1993-01-01

    Apparatus for manipulating a vacuum hose in a reactor vessel comprises a housing with two opposing openings, an arm carried by the housing and deployable from a stowed position essentially completely within the housing to an extended position where the arm extends through the two openings in a generally horizontal position. The arm preferably has a two-fingered gripping device for gripping the vacuum hose but may carry a different end effector such as a grinding wheel. The fingers are opened and closed by one air cylinder. A second air cylinder extends the device. A third air cylinder within the housing pivotally pulls the opposing end of the arm into the housing via a pivoting member pivotally connected between the third air cylinder shaft and the arm.

  9. REVIEWS OF TOPICAL PROBLEMS: Cosmic vacuum

    NASA Astrophysics Data System (ADS)

    Chernin, Artur D.

    2001-11-01

    Recent observational studies of distant supernovae have suggested the existence of cosmic vacuum whose energy density exceeds the total density of all the other energy components in the Universe. The vacuum produces the field of antigravity that causes the cosmological expansion to accelerate. It is this accelerated expansion that has been discovered in the observations. The discovery of cosmic vacuum radically changes our current understanding of the present state of the Universe. It also poses new challenges to both cosmology and fundamental physics. Why is the density of vacuum what it is? Why do the densities of the cosmic energy components differ in exact value but agree in order of magnitude? On the other hand, the discovery made at large cosmological distances of hundreds and thousands Mpc provides new insights into the dynamics of the nearby Universe, the motions of galaxies in the local volume of 10 - 20 Mpc where the cosmological expansion was originally discovered.

  10. Source replenishment device for vacuum deposition

    DOEpatents

    Hill, Ronald A.

    1988-01-01

    A material source replenishment device for use with a vacuum deposition apparatus. The source replenishment device comprises an intermittent motion producing gear arrangement disposed within the vacuum deposition chamber. An elongated rod having one end operably connected to the gearing arrangement is provided with a multiarmed head at the opposite end disposed adjacent the heating element of the vacuum deposition apparatus. An inverted U-shaped source material element is releasably attached to the outer end of each arm member whereby said multiarmed head is moved to locate a first of said material elements above said heating element, whereupon said multiarmed head is lowered to engage said material element with the heating element and further lowered to release said material element on the heating element. After vaporization of said material element, second and subsequent material elements may be provided to the heating element without the need for opening the vacuum deposition apparatus to the atmosphere.

  11. Source replenishment device for vacuum deposition

    DOEpatents

    Hill, R.A.

    1986-05-15

    A material source replenishment device for use with a vacuum deposition apparatus is described. The source replenishment device comprises an intermittent motion producing gear arrangement disposed within the vacuum deposition chamber. An elongated rod having one end operably connected to the gearing arrangement is provided with a multiarmed head at the opposite end disposed adjacent the heating element of the vacuum deposition apparatus. An inverted U-shaped source material element is releasably attached to the outer end of each arm member whereby said multiarmed head is moved to locate a first of said material elements above said heating element, whereupon said multiarmed head is lowered to engage said material element with the heating element and further lowered to release said material element on the heating element. After vaporization of said material element, second and subsequent material elements may be provided to the heating element without the need for opening the vacuum deposition apparatus to the atmosphere.

  12. Waveguide quantum electrodynamics in squeezed vacuum

    NASA Astrophysics Data System (ADS)

    You, Jieyu; Liao, Zeyang; Li, Sheng-Wen; Zubairy, M. Suhail

    2018-02-01

    We study the dynamics of a general multiemitter system coupled to the squeezed vacuum reservoir and derive a master equation for this system based on the Weisskopf-Wigner approximation. In this theory, we include the effect of positions of the squeezing sources which is usually neglected in the previous studies. We apply this theory to a quasi-one-dimensional waveguide case where the squeezing in one dimension is experimentally achievable. We show that while dipole-dipole interaction induced by ordinary vacuum depends on the emitter separation, the two-photon process due to the squeezed vacuum depends on the positions of the emitters with respect to the squeezing sources. The dephasing rate, decay rate, and the resonance fluorescence of the waveguide-QED in the squeezed vacuum are controllable by changing the positions of emitters. Furthermore, we demonstrate that the stationary maximum entangled NOON state for identical emitters can be reached with arbitrary initial state when the center-of-mass position of the emitters satisfies certain conditions.

  13. 29 CFR 1926.1413 - Wire rope-inspection.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 29 Labor 8 2011-07-01 2011-07-01 false Wire rope-inspection. 1926.1413 Section 1926.1413 Labor... Wire rope—inspection. (a) Shift inspection. (1) A competent person must begin a visual inspection prior... inspection must consist of observation of wire ropes (running and standing) that are likely to be in use...

  14. Sozzy: a hormone-driven autonomous vacuum cleaner

    NASA Astrophysics Data System (ADS)

    Yamamoto, Masaki

    1994-02-01

    Domestic robots are promising examples of the application of robotics to personal life. There have been many approaches in this field, but no successful results exist. The problem is that domestic environments are more difficult for robots than other environments, such as factory floors or office floors. Consequently, conventional approaches using a model of human intelligence to design robots have not been successful. In this paper, we report on a prototyped domestic vacuum-cleaning robot that is designed to be able to handle complex environments. The control software is composed of two layers, both of which are generally inspired by behaviors of living creatures. The first layer corresponds to a dynamically reconfigurable system of behaviors implemented in the subsumption architecture. The ability of the robot to support alternate configurations of its behaviors provides the robot with increased robustness. We have conveniently labeled particular configurations as specific `emotions' according to the interpretation of observers of the robot's behavior. The second layer simulates the hormone system. The hormone system is modeled using state variables, increased or decreased by stimuli from the environment. The hormone condition selects the robot's most suitable emotion, according to the changing environments. The robot hardware is built of off-the-shelf parts, such as an embedded CPU, inexpensive home-appliance sensors, and small motors. These parts keep the total building cost to a minimum. The robot also has a vacuum cleaning function to demonstrate its capability to perform useful tasks. We tested the robot in our laboratory, and successfully videotaped its robust behaviors. We also confirmed the hormone system to enhance the robot's plasticity and lifelike quality.

  15. Sugar maple sap volume increases as vacuum level is increased

    Treesearch

    Russell S. Walters; H. Clay Smith

    1975-01-01

    Maple sap yields collected by using plastic tubing with a vacuum pump increased as the vacuum level was increased. Sap volumes collected at the 10- and 15-inch mercury vacuum levels were statistically significantly higher than volumes collected at the 5-inch level. Although the 15-inch vacuum yielded more sap than the 10-inch vacuum, the difference was not...

  16. 7 CFR 996.8 - Incoming inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... STANDARDS FOR DOMESTIC AND IMPORTED PEANUTS MARKETED IN THE UNITED STATES Definitions § 996.8 Incoming inspection. Incoming inspection means the sampling, inspection, and certification of farmers stock peanuts to...

  17. 7 CFR 996.8 - Incoming inspection.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... STANDARDS FOR DOMESTIC AND IMPORTED PEANUTS MARKETED IN THE UNITED STATES Definitions § 996.8 Incoming inspection. Incoming inspection means the sampling, inspection, and certification of farmers stock peanuts to...

  18. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  19. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  20. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  1. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  2. 15 CFR 270.322 - Voluntary permission to enter and inspect property where building components, materials...

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... CONSTRUCTION SAFETY TEAMS NATIONAL CONSTRUCTION SAFETY TEAMS Collection and Preservation of Evidence... records with respect to a building failure are located. After the Director establishes and deploys a Team, members of the public are encouraged to voluntarily permit Team members to enter property where building...

  3. Outgassing of solid material into vacuum thermal insulation spaces

    NASA Technical Reports Server (NTRS)

    Wang, Pao-Lien

    1994-01-01

    Many cryogenic storage tanks use vacuum between inner and outer tank for thermal insulation. These cryogenic tanks also use a radiation shield barrier in the vacuum space to prevent radiation heat transfer. This shield is usually constructed by using multiple wraps of aluminized mylar and glass paper as inserts. For obtaining maximum thermal performance, a good vacuum level must be maintained with the insulation system. It has been found that over a period of time solid insulation materials will vaporize into the vacuum space and the vacuum will degrade. In order to determine the degradation of vacuum, the rate of outgassing of the insulation materials must be determined. Outgassing rate of several insulation materials obtained from literature search were listed in tabular form.

  4. 40 CFR 60.36e - Inspection guidelines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ...; (v) Inspect HMIWI door and door gaskets for proper sealing; (vi) Inspect motors for proper operation... applicable; (xiv) Inspect waste heat boiler systems to ensure proper operation, if applicable; (xv) Inspect...

  5. 9 CFR 590.122 - Time of inspection.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... shall be given reasonable advance notice by plant management of the hours when such inspection will be... PRODUCTS INSPECTION INSPECTION OF EGGS AND EGG PRODUCTS (EGG PRODUCTS INSPECTION ACT) Performance of...

  6. System Enhancements for Mechanical Inspection Processes

    NASA Technical Reports Server (NTRS)

    Hawkins, Myers IV

    2011-01-01

    Quality inspection of parts is a major component to any project that requires hardware implementation. Keeping track of all of the inspection jobs is essential to having a smooth running process. By using HTML, the programming language ColdFusion, and the MySQL database, I created a web-based job management system for the 170 Mechanical Inspection Group that will replace the Microsoft Access based management system. This will improve the ways inspectors and the people awaiting inspection view and keep track of hardware as it is in the inspection process. In the end, the management system should be able to insert jobs into a queue, place jobs in and out of a bonded state, pre-release bonded jobs, and close out inspection jobs.

  7. 14 CFR 135.429 - Required inspection personnel.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... item of work that is a required inspection item that is part of the flight control system shall be... supervision and control of an inspection unit. (c) No person may perform a required inspection if that person... maintenance program; (4) Each item is inspected after each flight until the item has been inspected by an...

  8. 14 CFR 135.429 - Required inspection personnel.

    Code of Federal Regulations, 2014 CFR

    2014-01-01

    ... item of work that is a required inspection item that is part of the flight control system shall be... supervision and control of an inspection unit. (c) No person may perform a required inspection if that person... maintenance program; (4) Each item is inspected after each flight until the item has been inspected by an...

  9. 14 CFR 135.429 - Required inspection personnel.

    Code of Federal Regulations, 2013 CFR

    2013-01-01

    ... item of work that is a required inspection item that is part of the flight control system shall be... supervision and control of an inspection unit. (c) No person may perform a required inspection if that person... maintenance program; (4) Each item is inspected after each flight until the item has been inspected by an...

  10. 14 CFR 135.429 - Required inspection personnel.

    Code of Federal Regulations, 2012 CFR

    2012-01-01

    ... item of work that is a required inspection item that is part of the flight control system shall be... supervision and control of an inspection unit. (c) No person may perform a required inspection if that person... maintenance program; (4) Each item is inspected after each flight until the item has been inspected by an...

  11. 14 CFR 135.429 - Required inspection personnel.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... item of work that is a required inspection item that is part of the flight control system shall be... supervision and control of an inspection unit. (c) No person may perform a required inspection if that person... maintenance program; (4) Each item is inspected after each flight until the item has been inspected by an...

  12. Magnetic particle inspection

    NASA Technical Reports Server (NTRS)

    Sastri, Sankar

    1990-01-01

    The purpose of this experiment is to familiarize the student with magnetic particle inspection and relate it to classification of various defects. Magnetic particle inspection is a method of detecting the presence of cracks, laps, tears, inclusions, and similar discontinuities in ferromagnetic materials such as iron and steel. This method will most clearly show defects that are perpendicular to the magnetic field. The Magnaglo method uses a liquid which is sprayed on the workpiece to be inspected, and the part is magnetized at the same time. The workpiece is then viewed under a black light, and the presence of discontinuity is shown by the formation of a bright indication formed by the magnetic particles over the discontinuity. The equipment and experimental procedures are described.

  13. Mass spectrometer vacuum housing and pumping system

    DOEpatents

    Coutts, G.W.; Bushman, J.F.; Alger, T.W.

    1996-07-23

    A vacuum housing and pumping system is described for a portable gas chromatograph/mass spectrometer (GC/MS). The vacuum housing section of the system has minimum weight for portability while designed and constructed to utilize metal gasket sealed stainless steel to be compatible with high vacuum operation. The vacuum pumping section of the system consists of a sorption (getter) pump to remove atmospheric leakage and outgassing contaminants as well as the gas chromatograph carrier gas (hydrogen) and an ion pump to remove the argon from atmospheric leaks. The overall GC/MS system has broad application to contaminants, hazardous materials, illegal drugs, pollution monitoring, etc., as well as for use by chemical weapon treaty verification teams, due to the light weight and portability thereof. 7 figs.

  14. Mass spectrometer vacuum housing and pumping system

    DOEpatents

    Coutts, Gerald W.; Bushman, John F.; Alger, Terry W.

    1996-01-01

    A vacuum housing and pumping system for a portable gas chromatograph/mass spectrometer (GC/MS). The vacuum housing section of the system has minimum weight for portability while designed and constructed to utilize metal gasket sealed stainless steel to be compatible with high vacuum operation. The vacuum pumping section of the system consists of a sorption (getter) pump to remove atmospheric leakage and outgassing contaminants as well as the gas chromatograph carrier gas (hydrogen) and an ion pump to remove the argon from atmospheric leaks. The overall GC/MS system has broad application to contaminants, hazardous materials, illegal drugs, pollution monitoring, etc., as well as for use by chemical weapon treaty verification teams, due to the light weight and portability thereof.

  15. Viability of Cladosporium herbarum spores under 157 nm laser and vacuum ultraviolet irradiation, low temperature (10 K) and vacuum

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Sarantopoulou, E., E-mail: esarant@eie.gr; Stefi, A.; Kollia, Z.

    Ultraviolet photons can damage microorganisms, which rarely survive prolonged irradiation. In addition to the need for intact DNA, cell viability is directly linked to the functionality of the cell wall and membrane. In this work, Cladosporium herbarum spore monolayers exhibit high viability (7%) when exposed to 157 nm laser irradiation (412 kJm⁻²) or vacuum-ultraviolet irradiation (110–180 nm) under standard pressure and temperature in a nitrogen atmosphere. Spore viability can be determined by atomic-force microscopy, nano-indentation, mass, μ-Raman and attenuated reflectance Fourier-transform far-infrared spectroscopies and DNA electrophoresis. Vacuum ultraviolet photons cause molecular damage to the cell wall, but radiation resistance inmore » spores arises from the activation of a photon-triggered signaling reaction, expressed via the exudation of intracellular substances, which, in combination with the low penetration depth of vacuum-ultraviolet photons, shields DNA from radiation. Resistance to phototoxicity under standard conditions was assessed, as was resistance to additional environmental stresses, including exposure in a vacuum, under different rates of change of pressure during pumping time and low (10 K) temperatures. Vacuum conditions were far more destructive to spores than vacuum-ultraviolet irradiation, and UV-B photons were two orders of magnitude more damaging than vacuum-ultraviolet photons. The viability of irradiated spores was also enhanced at 10 K. This work, in addition to contributing to the photonic control of the viability of microorganisms exposed under extreme conditions, including decontamination of biological warfare agents, outlines the basis for identifying bio-signaling in vivo using physical methodologies.« less

  16. Vacuum deposition and curing of liquid monomers apparatus

    DOEpatents

    Affinito, John D.

    1996-01-01

    The present invention is the formation of solid polymer layers under vacuum. More specifically, the present invention is the use of "standard" polymer layer-making equipment that is generally used in an atmospheric environment in a vacuum, and degassing the monomer material prior to injection into the vacuum. Additional layers of polymer or metal or oxide may be vacuum deposited onto solid polymer layers. Formation of polymer layers under a vacuum improves material and surface characteristics, and subsequent quality of bonding to additional layers. Further advantages include use of less to no photoinitiator for curing, faster curing, fewer impurities in the polymer electrolyte, as well as improvement in material properties including no trapped gas resulting in greater density, and reduced monomer wetting angle that facilitates spreading of the monomer and provides a smoother finished surface.

  17. Industrial applications of automated X-ray inspection

    NASA Astrophysics Data System (ADS)

    Shashishekhar, N.

    2015-03-01

    Many industries require that 100% of manufactured parts be X-ray inspected. Factors such as high production rates, focus on inspection quality, operator fatigue and inspection cost reduction translate to an increasing need for automating the inspection process. Automated X-ray inspection involves the use of image processing algorithms and computer software for analysis and interpretation of X-ray images. This paper presents industrial applications and illustrative case studies of automated X-ray inspection in areas such as automotive castings, fuel plates, air-bag inflators and tires. It is usually necessary to employ application-specific automated inspection strategies and techniques, since each application has unique characteristics and interpretation requirements.

  18. Development of a MEMS-Scale Turbomachinery Based Vacuum Pump

    DTIC Science & Technology

    2012-06-01

    MEMS -SCALE TURBOMACHINERY BASED VACUUM PUMP by Michael J. Shea June 2012 Thesis Advisor: Anthony J. Gannon Second Reader...June 2012 3. REPORT TYPE AND DATES COVERED Master’s Thesis 4. TITLE AND SUBTITLE Development of a MEMS -Scale Turbomachinery Based Vacuum Pump 5...to develop a MEMS scale turbomachinery based vacuum pump. This would allow very high vacuum to be drawn for handheld mass spectroscopy. This

  19. Vacuum system for the SAMURAI spectrometer

    NASA Astrophysics Data System (ADS)

    Shimizu, Y.; Otsu, H.; Kobayashi, T.; Kubo, T.; Motobayashi, T.; Sato, H.; Yoneda, K.

    2013-12-01

    The first commissioning experiment of the SAMURAI spectrometer and its beam line was performed in March, 2012. The vacuum system for the SAMURAI spectrometer includes its beam line and the SAMURAI vacuum chamber with the windows for detecting neutrons and charged particles. The window for neutrons was made of stainless steel with a thickness of 3 mm and was designed with a shape of partial cylinder to support itself against the atmospheric pressure. The window for charged particles was of the combination of Kevlar and Mylar with the thickness of 280 and 75 μm, respectively. The pressure in the vacuum system was at a few Pa throughout the commissioning experiment.

  20. Moving characteristics of electrodes for vacuum circuit breaker

    NASA Astrophysics Data System (ADS)

    Yuan, Shun; Wang, Jimei

    1994-05-01

    This paper analyzes the effect of the gap of electrodes on the state of vacuum arc by experiment and theory. And the model of vacuum arc is set up. The optimal gap can be deduced from controlling the vacuum arc to be diffusion state, in order to get the optimal moving characteristics of electrodes.

  1. Three stage vacuum system for ultralow temperature installation

    NASA Astrophysics Data System (ADS)

    Das, N. K.; Pradhan, J.; Naser, Md Z. A.; Mandal, B. Ch; Roy, A.; Kumar, P.; Mallik, C.; Bhandari, R. K.

    2012-11-01

    We use a three stage vacuum system for developing a dilution fridge at VECC, Kolkata. We aim at achieving a cooling power of 20μW at 100mK for various experiments especially in the field of condensed matter and nuclear physics. The system is essentially composed of four segments-bath cryostat, vacuum system, dilution insert and 3He circulation circuit. Requirement of vacuum system at different stages are different. The vacuum system for cryostat and for internal vacuum chamber located within the helium bath is a common turbo molecular pump backed by scroll pump as to maintain a vacuum ~10-6mbar. For bringing down the temperature of the helium evaporator, we use a high throughput Roots pump backed by a dry pump. The pumping system for 3He distillation chamber (still) requires a high pumping speed, so a turbo drag pump backed by a scroll pump has been installed. As the fridge use precious 3He gas for operation, the entire system has been made to be absolutely leak proof with respect to the 3He gas.

  2. Carbon nanotubes based vacuum gauge

    NASA Astrophysics Data System (ADS)

    Rudyk, N. N.; Il'in, O. I.; Il'ina, M. V.; Fedotov, A. A.; Klimin, V. S.; Ageev, O. A.

    2017-11-01

    We have created an ionization type Vacuum gauge with sensor element based on an array of vertically aligned carbon nanotubes. Obtained asymmetrical current-voltage characteristics at different voltage polarity on the electrode with the CNTs. It was found that when applying a negative potential on an electrode with the CNTs, the current in the gap is higher than at a positive potential. In the pressure range of 1 ÷ 103 Torr vacuum gauge sensitivity was 6 mV/Torr (at a current of 4.5·10-5 A) and in the range of 10-5 ÷ 1 Torr was 10 mV/Torr (at a current of 1.3·10-5 A). It is shown that the energy efficiency of vacuum gauge can be increased in the case where electrode with CNT operates as an emitter of electrons.

  3. Nuclear Technology. Course 30: Mechanical Inspection. Module 30-6, Protective Coating Inspection.

    ERIC Educational Resources Information Center

    Espy, John

    This sixth in a series of eight modules for a course titled Mechanical Inspection describes the duties of the nuclear quality assurance/quality control technician that are associated with protective coatings, and the national standards that govern the selection, application, and inspection of protective coatings for the reactor containment…

  4. Laser Shearographic Inspection for Debonds in Sprayed On Foam Insulation (SOFI)

    NASA Technical Reports Server (NTRS)

    Adams, F. W.; Hooker, J.; Simmons, S.

    1997-01-01

    Preliminary results of shearographic inspections of the test panels simulating the Space Shuttle's external tank (ET) spray on foam insulation (SOFI) are presented. Debonding of SOFI may introduce flight debris that may damage the orbiter's thermal protection system (TPS) exposing the orbiter (as well as the ET) to thermal loading. It is estimated that 90 percent of the TPS damage on the orbiter's 'belly' results from debonded SOFI during ascent. A series of test panels were fabricated, with programmed debonds of different geometries and sizes, to determine the sensitivity of shearography as a function of debond size, SOFI thickness,'and vacuum excitation. Results show that a Probability of Detection (POD) of 0.95 or better can be expected for debonds with a diameter equal to the SOFI thickness as less than 0.4-psi pressure reduction. More testing will be required to validate the laser shearography imaging process for certifying its use in nondestructive evaluation (NDE) of Space Shuttle space flight components.

  5. Evaluating Heuristics for Planning Effective and Efficient Inspections

    NASA Technical Reports Server (NTRS)

    Shull, Forrest J.; Seaman, Carolyn B.; Diep, Madeline M.; Feldmann, Raimund L.; Godfrey, Sara H.; Regardie, Myrna

    2010-01-01

    A significant body of knowledge concerning software inspection practice indicates that the value of inspections varies widely both within and across organizations. Inspection effectiveness and efficiency can be measured in numerous ways, and may be affected by a variety of factors such as Inspection planning, the type of software, the developing organization, and many others. In the early 1990's, NASA formulated heuristics for inspection planning based on best practices and early NASA inspection data. Over the intervening years, the body of data from NASA inspections has grown. This paper describes a multi-faceted exploratory analysis performed on this · data to elicit lessons learned in general about conducting inspections and to recommend improvements to the existing heuristics. The contributions of our results include support for modifying some of the original inspection heuristics (e.g. Increasing the recommended page rate), evidence that Inspection planners must choose between efficiency and effectiveness, as a good tradeoff between them may not exist, and Identification of small subsets of inspections for which new inspection heuristics are needed. Most Importantly, this work illustrates the value of collecting rich data on software Inspections, and using it to gain insight into, and Improve, inspection practice.

  6. The U.S. Lab placed in vacuum chamber for leak test

    NASA Technical Reports Server (NTRS)

    2000-01-01

    In the Operations and Checkout Building, the U.S. Lab, a component of the International Space Station, is lowered into a three-story vacuum chamber. The 32,000-pound scientific research lab, named Destiny, is the first Space Station element to spend seven days in the renovated vacuum chamber for a leak test. Destiny is scheduled to be launched on Shuttle mission STS-98, the 5A assembly mission, targeted for Jan. 18, 2001. During the mission, the crew will install the Lab in the Space Station during a series of three space walks. The STS-98 mission will provide the Station with science research facilities and expand its power, life support and control capabilities. The U.S. Lab module continues a long tradition of microgravity materials research, first conducted by Skylab and later Shuttle and Spacelab missions. Destiny is expected to be a major feature in future research, providing facilities for biotechnology, fluid physics, combustion, and life sciences research.

  7. Baryogenesis in false vacuum

    NASA Astrophysics Data System (ADS)

    Hamada, Yuta; Yamada, Masatoshi

    2017-09-01

    The null result in the LHC may indicate that the standard model is not drastically modified up to very high scales, such as the GUT/string scale. Having this in the mind, we suggest a novel leptogenesis scenario realized in the false vacuum of the Higgs field. If the Higgs field develops a large vacuum expectation value in the early universe, a lepton number violating process is enhanced, which we use for baryogenesis. To demonstrate the scenario, several models are discussed. For example, we show that the observed baryon asymmetry is successfully generated in the standard model with higher-dimensional operators.

  8. Comparative Evaluation of Vacuum-based Surface Sampling ...

    EPA Pesticide Factsheets

    Journal Article Following a biological contamination incident, collection of surface samples is necessary to determine the extent and level of contamination, and to deem an area safe for reentry upon decontamination. Current sampling strategies targeting Bacillus anthracis spores prescribe vacuum-based methods for rough and/or porous surfaces. In this study, four commonly-used B. anthracis spore sampling devices (vacuum socks, 37 mm 0.8 µm MCE filter cassettes, 37 mm 0.3 µm PTFE filter cassettes, and 3MTM forensic filters) were comparatively evaluated for their ability to recover surface-associated spores. The vacuum sock device was evaluated at two sampling speeds (slow and fast), resulting in five total methods evaluated. Aerosolized spores (~105 cm-2) of a surrogate Bacillus species (Bacillus atrophaeus) were allowed to settle onto three material types (concrete, carpet, and upholstery). Ten replicate samples were collected using each vacuum method, from each of the three material types. In addition, stainless steel (i.e., nonporous) surfaces inoculated simultaneously were sampled with pre-moistened wipes. Recoveries from wipes of steel surfaces were utilized to verify the inoculum, and to normalize vacuum-based recoveries across trials. Recovery (CFU cm-2) and relative recovery (vacuum recovery/wipe recovery) were determined for each method and material type. Relative recoveries were compared by one-way and three-way ANOVA. Data analysis by one-

  9. Multimodal inspection in power engineering and building industries: new challenges and solutions

    NASA Astrophysics Data System (ADS)

    Kujawińska, Małgorzata; Malesa, Marcin; Malowany, Krzysztof

    2013-09-01

    Recently the demand and number of applications of full-field, optical measurement methods based on noncoherent light sources increased significantly. They include traditional image processing, thermovision, digital image correlation (DIC) and structured light methods. However, there are still numerous challenges connected with implementation of these methods to in-situ, long-term monitoring in industrial, civil engineering and cultural heritage applications, multimodal measurements of a variety of object features or simply adopting instruments to work in hard environmental conditions. In this paper we focus on 3D DIC method and present its enhancements concerning software modifications (new visualization methods and a method for automatic merging of data distributed in time) and hardware improvements. The modified 3D DIC system combined with infrared camera system is applied in many interesting cases: measurements of boiler drum during annealing and of pipelines in heat power stations and monitoring of different building steel struts at construction site and validation of numerical models of large building structures constructed of graded metal plate arches.

  10. Vacuum energy from noncommutative models

    NASA Astrophysics Data System (ADS)

    Mignemi, S.; Samsarov, A.

    2018-04-01

    The vacuum energy is computed for a scalar field in a noncommutative background in several models of noncommutative geometry. One may expect that the noncommutativity introduces a natural cutoff on the ultraviolet divergences of field theory. Our calculations show however that this depends on the particular model considered: in some cases the divergences are suppressed and the vacuum energy is only logarithmically divergent, in other cases they are stronger than in the commutative theory.

  11. Sealed vacuum canister and method for pick-up and containment of material

    DOEpatents

    Stoutenburgh, Roger R.

    1996-01-01

    A vacuum canister including a housing with a sealed vacuum chamber having a predetermined vacuum pressure therein and a valve having a first port for fluid communication with the vacuum chamber and a second port for receiving at least one of a fluid and a particulate material. The valve is operable between a first position to seal the vacuum chamber and retain the predetermined vacuum within the vacuum chamber, and a second position to access the vacuum chamber to permit vacuum fluid flow through the valve from the second port into the vacuum chamber. In operation of the vacuum canister to pick up material with the valve in the second position, when the second port is located adjacent at least one of a fluid and a particulate material, is effective to displace through the valve at least one of a fluid and a particulate material into the housing. The vacuum canister is desirably suitable for picking up and containing hazardous material such as radioactive material, in which the vacuum canister includes a protective layer of lead having a predetermined thickness that is effective to shield radiation emitted from the radioactive material contained within the housing. Advantageously, the vacuum canister includes a vacuum means for establishing a predetermined vacuum pressure within the vacuum chamber.

  12. 9 CFR 592.400 - Who may request an appeal inspection or review of an inspection program employee's decision.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Who may request an appeal inspection or review of an inspection program employee's decision. 592.400 Section 592.400 Animals and Animal Products FOOD SAFETY AND INSPECTION SERVICE, DEPARTMENT OF AGRICULTURE EGG PRODUCTS INSPECTION VOLUNTARY...

  13. Housatonic River Basin, Danbury, Connecticut. Lower Kohanza Dam (CT 00064). National Dam Inspection Program. Phase I Inspection Report.

    DTIC Science & Technology

    1981-05-01

    CONNECTICUT PHASE I INSPECTION REPORT’ I NATIONAL DAM INSPECTION PRGRAM 1 NATIONAL DAM INSPECTION PROGRAM PHASE I INSPECTION REPORT Identification No...of the toe of the aam and backtill the resulting voids with a suitable compacted material. Grass shoula be planted over the repairea areas to prevent

  14. An ultra-high vacuum chamber for scattering experiments featuring in-vacuum continuous in-plane variation of the angle between entrance and exit vacuum ports

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Englund, Carl-Johan; Agåker, Marcus, E-mail: marcus.agaker@physics.uu.se; Fredriksson, Pierre

    2015-09-15

    A concept that enables in-vacuum continuous variation of the angle between two ports in one plane has been developed and implemented. The vacuum chamber allows for measuring scattering cross sections as a function of scattering angle and is intended for resonant inelastic X-ray scattering experiments. The angle between the ports can be varied in the range of 30°-150°, while the pressure change is less than 2 × 10{sup −10} mbars.

  15. Overview of Fabrication Techniques and Lessons Learned with Accelerator Vacuum Windows

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ader, C. R.; McGee, M. W.; Nobrega, L. E.

    Vacuum thin windows have been used in Fermilab's accelerators for decades and typically have been overlooked in terms of their criticality and fragility. Vacuum windows allow beam to pass through while creating a boundary between vacuum and air or high vacuum and low vacuum areas. The design of vacuum windows, including Titanium and Beryllium windows, will be discussed as well as fabrication, testing, and operational concerns. Failure of windows will be reviewed as well as safety approaches to mitigating failures and extending the lifetimes of vacuum windows. Various methods of calculating the strengths of vacuum windows will be explored, includingmore » FEA.« less

  16. Safety shield for vacuum/pressure-chamber windows

    NASA Technical Reports Server (NTRS)

    Shimansky, R. A.; Spencer, R.

    1980-01-01

    Optically-clear shatter-resistant safety shield protects workers from implosion and explosion of vacuum and pressure windows. Plastic shield is inexpensive and may be added to vacuum chambers, pressure chambers, and gas-filling systems.

  17. Multi-level scanning method for defect inspection

    DOEpatents

    Bokor, Jeffrey; Jeong, Seongtae

    2002-01-01

    A method for performing scanned defect inspection of a collection of contiguous areas using a specified false-alarm-rate and capture-rate within an inspection system that has characteristic seek times between inspection locations. The multi-stage method involves setting an increased false-alarm-rate for a first stage of scanning, wherein subsequent stages of scanning inspect only the detected areas of probable defects at lowered values for the false-alarm-rate. For scanning inspection operations wherein the seek time and area uncertainty is favorable, the method can substantially increase inspection throughput.

  18. Vacuum tool manipulator

    DOEpatents

    Zollinger, W.T.

    1993-11-23

    Apparatus for manipulating a vacuum hose in a reactor vessel comprises a housing with two opposing openings, an arm carried by the housing and deployable from a stowed position essentially completely within the housing to an extended position where the arm extends through the two openings in a generally horizontal position. The arm preferably has a two-fingered gripping device for gripping the vacuum hose but may carry a different end effector such as a grinding wheel. The fingers are opened and closed by one air cylinder. A second air cylinder extends the device. A third air cylinder within the housing pivotally pulls the opposing end of the arm into the housing via a pivoting member pivotally connected between the third air cylinder shaft and the arm. 6 figures.

  19. 47 CFR 0.460 - Requests for inspection of records which are routinely available for public inspection.

    Code of Federal Regulations, 2010 CFR

    2010-10-01

    ... pay (see § 0.467). (2) Written requests shall be delivered or mailed directly to the Commission's copy... routinely available for public inspection. 0.460 Section 0.460 Telecommunication FEDERAL COMMUNICATIONS... § 0.460 Requests for inspection of records which are routinely available for public inspection. (a...

  20. 9 CFR 381.67 - Young chicken and squab slaughter inspection rate maximums under traditional inspection procedure.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 9 Animals and Animal Products 2 2010-01-01 2010-01-01 false Young chicken and squab slaughter... INSPECTION REGULATIONS Operating Procedures § 381.67 Young chicken and squab slaughter inspection rate... inspector per minute under the traditional inspection procedure for the different young chicken and squab...

  1. 7 CFR 57.925 - Inspection of imported eggs.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... 7 Agriculture 3 2010-01-01 2010-01-01 false Inspection of imported eggs. 57.925 Section 57.925... AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT (CONTINUED) INSPECTION OF EGGS (EGG PRODUCTS INSPECTION ACT) Regulations Governing the Inspection of Eggs Imports § 57.925 Inspection of...

  2. 7 CFR 57.925 - Inspection of imported eggs.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... 7 Agriculture 3 2011-01-01 2011-01-01 false Inspection of imported eggs. 57.925 Section 57.925... AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT (CONTINUED) INSPECTION OF EGGS (EGG PRODUCTS INSPECTION ACT) Regulations Governing the Inspection of Eggs Imports § 57.925 Inspection of...

  3. Extreme-UV lithography vacuum chamber zone seal

    DOEpatents

    Haney, Steven J.; Herron, Donald Joe; Klebanoff, Leonard E.; Replogle, William C.

    2001-01-01

    Control of particle contamination on the reticle and carbon contamination of optical surfaces in photolithography systems can be achieved by the establishment of multiple pressure zones in the photolithography systems. The different zones will enclose the reticle, projection optics, wafer, and other components of system. The system includes a vacuum apparatus that includes: a housing defining a vacuum chamber; one or more metrology trays situated within the vacuum chamber each of which is supported by at least one support member, wherein the tray separates the vacuum chamber into a various compartments that are maintained at different pressures; and conductance seal devices for adjoining the perimeter of each tray to an inner surface of the housing wherein the tray is decoupled from vibrations emanating from the inner surface of the housing.

  4. Extreme-UV lithography vacuum chamber zone seal

    DOEpatents

    Haney, Steven J.; Herron, Donald Joe; Klebanoff, Leonard E.; Replogle, William C.

    2003-04-08

    Control of particle contamination on the reticle and carbon contamination of optical surfaces in photolithography systems can be achieved by the establishment of multiple pressure zones in the photolithography systems. The different zones will enclose the reticle, projection optics, wafer, and other components of system. The system includes a vacuum apparatus that includes: a housing defining a vacuum chamber; one or more metrology trays situated within the vacuum chamber each of which is supported by at least one support member, wherein the tray separates the vacuum chamber into a various compartments that are maintained at different pressures; and conductance seal devices for adjoining the perimeter of each tray to an inner surface of the housing wherein the tray is decoupled from vibrations emanating from the inner surface of the housing.

  5. Extreme-UV lithography vacuum chamber zone seal

    DOEpatents

    Haney, Steven J.; Herron, Donald Joe; Klebanoff, Leonard E.; Replogle, William C.

    2003-04-15

    Control of particle contamination on the reticle and carbon contamination of optical surfaces in photolithography systems can be achieved by the establishment of multiple pressure zones in the photolithography systems. The different zones will enclose the reticle, projection optics, wafer, and other components of system. The system includes a vacuum apparatus that includes: a housing defining a vacuum chamber; one or more metrology trays situated within the vacuum chamber each of which is supported by at least one support member, wherein the tray separates the vacuum chamber into a various compartments that are maintained at different pressures; and conductance seal devices for adjoining the perimeter of each tray to an inner surface of the housing wherein the tray is decoupled from vibrations emanating from the inner surface of the housing.

  6. Vacuum deposition and curing of liquid monomers apparatus

    DOEpatents

    Affinito, J.D.

    1996-08-20

    The present invention is the formation of solid polymer layers under vacuum. More specifically, the present invention is the use of ``standard`` polymer layer-making equipment that is generally used in an atmospheric environment in a vacuum, and degassing the monomer material prior to injection into the vacuum. Additional layers of polymer or metal or oxide may be vacuum deposited onto solid polymer layers. Formation of polymer layers under a vacuum improves material and surface characteristics, and subsequent quality of bonding to additional layers. Further advantages include use of less to no photoinitiator for curing, faster curing, fewer impurities in the polymer electrolyte, as well as improvement in material properties including no trapped gas resulting in greater density, and reduced monomer wetting angle that facilitates spreading of the monomer and provides a smoother finished surface. 3 figs.

  7. Track inspection planning and risk measurement analysis.

    DOT National Transportation Integrated Search

    2014-11-01

    This project models track inspection operations on a railroad network and discusses how the inspection results can : be used to measure the risk of failure on the tracks. In particular, the inspection times of the tracks, inspection frequency of the ...

  8. 7 CFR 75.38 - Lot inspections.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Standards, Inspections, Marketing Practices), DEPARTMENT OF AGRICULTURE (CONTINUED) REGULATIONS AND STANDARDS UNDER THE AGRICULTURAL MARKETING ACT OF 1946 AND THE EGG PRODUCTS INSPECTION ACT (CONTINUED) REGULATIONS FOR INSPECTION...

  9. Visual inspection reliability of transport aircraft

    NASA Astrophysics Data System (ADS)

    Spencer, Floyd W.

    1996-11-01

    The Federal Aviation Administration Technical Center has sponsored a visual inspection reliability program at its airworthiness assurance nondestructive inspection validation center (AANC). We report on the results of the benchmark phase of that program in which 12 inspectors were observed in two days of inspections on a Boeing 737 aircraft. All of the inspectors were currently employed with major airlines and all had experience inspecting the Boeing 737 aircraft. Each inspector spent 2 days at the AANC facility where they inspected to the same ten job cards. Each inspector was videotaped and all nonroutine repair actions were recorded for each inspector. Background information on each of the inspectors, including vision test results, was also gathered. The inspection results were correlated with the background variables. Aviation experience and a test time reflecting visual acuity were significantly correlated with performance factors. An analysis of the video tapes was performed to separate decision errors from search errors. Probability of detection curves were fit to the results of inspecting for cracks from beneath rivet heads in a task using prepared samples with known cracks.

  10. Microbial analysis of meatballs cooled with vacuum and conventional cooling.

    PubMed

    Ozturk, Hande Mutlu; Ozturk, Harun Kemal; Koçar, Gunnur

    2017-08-01

    Vacuum cooling is a rapid evaporative cooling technique and can be used for pre-cooling of leafy vegetables, mushroom, bakery, fishery, sauces, cooked food, meat and particulate foods. The aim of this study was to apply the vacuum cooling and the conventional cooling techniques for the cooling of the meatball and to show the vacuum pressure effect on the cooling time, the temperature decrease and microbial growth rate. The results of the vacuum cooling and the conventional cooling (cooling in the refrigerator) were compared with each other for different temperatures. The study shows that the conventional cooling was much slower than the vacuum cooling. Moreover, the microbial growth rate of the vacuum cooling was extremely low compared with the conventional cooling. Thus, the lowest microbial growth occurred at 0.7 kPa and the highest microbial growth was observed at 1.5 kPa for the vacuum cooling. The mass loss ratio for the conventional cooling and vacuum cooling was about 5 and 9% respectively.

  11. Recycling of waste lead storage battery by vacuum methods.

    PubMed

    Lin, Deqiang; Qiu, Keqiang

    2011-07-01

    Waste lead storage battery is the most important recyclable lead material not only in various European and other OECD countries but also in China. Pollution control of lead has become the focus of people's attention in the world. A vacuum process for recycling waste lead storage battery was developed in this work. The experimental results showed that all the valuable materials in waste lead storage battery could be satisfactorily recycled by vacuum technologies. The vacuum melting of lead grids and the vacuum reduction of lead pastes produce the lead bullion with the direct recovery ratio of 96.29% and 98.98%, respectively. The vacuum pyrolysis of plastics can produce pyrolysis oil with yield of more than 93 wt.%. These vacuum recycling technologies offer improvements in metallurgical and environmental performance. Copyright © 2011 Elsevier Ltd. All rights reserved.

  12. Window-assisted nanosphere lithography for vacuum micro-nano-electronics

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Li, Nannan; Institute of Electronic Engineering, Chinese Academy of Engineering Physics, Mianyang, 621900; Pang, Shucai

    2015-04-15

    Development of vacuum micro-nano-electronics is quite important for combining the advantages of vacuum tubes and solid-state devices but limited by the prevailing fabricating techniques which are expensive, time consuming and low-throughput. In this work, window-assisted nanosphere lithography (NSL) technique was proposed and enabled the low-cost and high-efficiency fabrication of nanostructures for vacuum micro-nano-electronic devices, thus allowing potential applications in many areas. As a demonstration, we fabricated high-density field emitter arrays which can be used as cold cathodes in vacuum micro-nano-electronic devices by using the window-assisted NSL technique. The details of the fabricating process have been investigated. This work provided amore » new and feasible idea for fabricating nanostructure arrays for vacuum micro-nano-electronic devices, which would spawn the development of vacuum micro-nano-electronics.« less

  13. Sealed vacuum canister and method for pick-up and containment of material

    DOEpatents

    Stoutenburgh, R.R.

    1996-02-13

    A vacuum canister is described including a housing with a sealed vacuum chamber having a predetermined vacuum pressure therein and a valve having a first port for fluid communication with the vacuum chamber and a second port for receiving at least one of a fluid and a particulate material. The valve is operable between a first position to seal the vacuum chamber and retain the predetermined vacuum within the vacuum chamber, and a second position to access the vacuum chamber to permit vacuum fluid flow through the valve from the second port into the vacuum chamber. The vacuum canister, in the operation to pick up material with the valve in the second position, when the second port is located adjacent at least one of a fluid and a particulate material, is effective to displace through the valve at least one of a fluid and a particulate material into the housing. The vacuum canister is desirably suitable for picking up and containing hazardous material such as radioactive material, in which the vacuum canister includes a protective layer of lead having a predetermined thickness that is effective to shield radiation emitted from the radioactive material contained within the housing. Advantageously, the vacuum canister includes a vacuum means for establishing a predetermined vacuum pressure within the vacuum chamber. 6 figs.

  14. Lean Construction Applications for Bridge Inspection

    DOT National Transportation Integrated Search

    2017-10-01

    Lean philosophy was used to analyze the efficiency of bridge inspection. Emphasis was put on identifying activities that add value to the final output, an owner approved bridge inspection report. 26 bridge inspections were shadowed. Time spent on bri...

  15. 75 FR 42643 - National Tunnel Inspection Standards

    Federal Register 2010, 2011, 2012, 2013, 2014

    2010-07-22

    ... inspectors; inspection frequencies; and a National Tunnel Inventory (NTI). DATES: Comments must be received... elements and specify an appropriate inspection frequency. Additionally, the DOT Inspector General (IG), in... with respect to how frequently tunnels are inspected. The frequency of tunnel inspections varies from...

  16. 7 CFR 920.55 - Inspection and certification.

    Code of Federal Regulations, 2010 CFR

    2010-01-01

    ... Agriculture Regulations of the Department of Agriculture (Continued) AGRICULTURAL MARKETING SERVICE (Marketing... such kiwifruit to be inspected by the Federal or Federal-State Inspection Service and certified as... and Federal-State Inspection Services with respect to the costs of the inspection required by...

  17. 7 CFR 75.31 - Appeal inspection certificate.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... AND CERTIFICATION OF QUALITY OF AGRICULTURAL AND VEGETABLE SEEDS Appeal Inspection § 75.31 Appeal... inspection certificate previously issued for the seed involved. Each appeal inspection certificate shall clearly identify the number and date of the inspection certificate which it supersedes. The superseded...

  18. Building Energy Storage Panel Based on Paraffin/Expanded Perlite: Preparation and Thermal Performance Study.

    PubMed

    Kong, Xiangfei; Zhong, Yuliang; Rong, Xian; Min, Chunhua; Qi, Chengying

    2016-01-25

    This study is focused on the preparation and performance of a building energy storage panel (BESP). The BESP was fabricated through a mold pressing method based on phase change material particle (PCMP), which was prepared in two steps: vacuum absorption and surface film coating. Firstly, phase change material (PCM) was incorporated into expanded perlite (EP) through a vacuum absorption method to obtain composite PCM; secondly, the composite PCM was immersed into the mixture of colloidal silica and organic acrylate, and then it was taken out and dried naturally. A series of experiments, including differential scanning calorimeter (DSC), scanning electron microscope (SEM), best matching test, and durability test, have been conducted to characterize and analyze the thermophysical property and reliability of PCMP. Additionally, the thermal performance of BESP was studied through a dynamic thermal property test. The results have showed that: (1) the surface film coating procedure can effectively solve the leakage problem of composite phase change material prepared by vacuum impregnation; (2) the optimum adsorption ratio for paraffin and EP was 52.5:47.5 in mass fraction, and the PCMP has good thermal properties, stability, and durability; and (3) in the process of dynamic thermal performance test, BESP have low temperature variation, significant temperature lagging, and large heat storage ability, which indicated the potential of BESP in the application of building energy efficiency.

  19. Building Energy Storage Panel Based on Paraffin/Expanded Perlite: Preparation and Thermal Performance Study

    PubMed Central

    Kong, Xiangfei; Zhong, Yuliang; Rong, Xian; Min, Chunhua; Qi, Chengying

    2016-01-01

    This study is focused on the preparation and performance of a building energy storage panel (BESP). The BESP was fabricated through a mold pressing method based on phase change material particle (PCMP), which was prepared in two steps: vacuum absorption and surface film coating. Firstly, phase change material (PCM) was incorporated into expanded perlite (EP) through a vacuum absorption method to obtain composite PCM; secondly, the composite PCM was immersed into the mixture of colloidal silica and organic acrylate, and then it was taken out and dried naturally. A series of experiments, including differential scanning calorimeter (DSC), scanning electron microscope (SEM), best matching test, and durability test, have been conducted to characterize and analyze the thermophysical property and reliability of PCMP. Additionally, the thermal performance of BESP was studied through a dynamic thermal property test. The results have showed that: (1) the surface film coating procedure can effectively solve the leakage problem of composite phase change material prepared by vacuum impregnation; (2) the optimum adsorption ratio for paraffin and EP was 52.5:47.5 in mass fraction, and the PCMP has good thermal properties, stability, and durability; and (3) in the process of dynamic thermal performance test, BESP have low temperature variation, significant temperature lagging, and large heat storage ability, which indicated the potential of BESP in the application of building energy efficiency. PMID:28787870

  20. A biological decontamination process for small, privately owned buildings.

    PubMed

    Krauter, Paula; Tucker, Mark

    2011-09-01

    An urban wide-area recovery and restoration effort following a large-scale biological release will require extensive resources and tax the capabilities of government authorities. Further, the number of private decontamination contractors available may not be sufficient to respond to the needs. These resource limitations could create the need for decontamination by the building owner/occupant. This article provides owners/occupants with a simple method to decontaminate a building or area following a wide-area release of Bacillus anthracis using liquid sporicidal decontamination materials, such as pH-amended bleach or activated peroxide; simple application devices; and high-efficiency particulate air-filtered vacuums. Owner/occupant decontamination would be recommended only after those charged with overseeing decontamination-the Unified Command/Incident Command-identify buildings and areas appropriate for owner/occupant decontamination based on modeling and environmental sampling and conduct health and safety training for cleanup workers.