Sample records for vehicle processing readiness

  1. A methodology for fostering commercialization of electric and hybrid vehicle propulsion systems

    NASA Technical Reports Server (NTRS)

    Thollot, P. A.; Musial, N. T.

    1980-01-01

    The rationale behind, and a proposed approach for, application of government assistance to accelerate the process of moving a new electric vehicle propulsion system product from technological readiness to profitable marketplace acceptance and utilization are described. Emphasis is on strategy, applicable incentives, and an implementation process.

  2. Vehicle-to-vehicle communications : readiness of V2V technology for application.

    DOT National Transportation Integrated Search

    2014-08-01

    The purpose of this research report is to assess the readiness for application of vehicle-to-vehicle (V2V) : communications, a system designed to transmit basic safety information between vehicles to facilitate warnings to : drivers concerning impend...

  3. International Space Station Requirement Verification for Commercial Visiting Vehicles

    NASA Technical Reports Server (NTRS)

    Garguilo, Dan

    2017-01-01

    The COTS program demonstrated NASA could rely on commercial providers for safe, reliable, and cost-effective cargo delivery to ISS. The ISS Program has developed a streamlined process to safely integrate commercial visiting vehicles and ensure requirements are met Levy a minimum requirement set (down from 1000s to 100s) focusing on the ISS interface and safety, reducing the level of NASA oversight/insight and burden on the commercial Partner. Partners provide a detailed verification and validation plan documenting how they will show they've met NASA requirements. NASA conducts process sampling to ensure that the established verification processes is being followed. NASA participates in joint verification events and analysis for requirements that require both parties verify. Verification compliance is approved by NASA and launch readiness certified at mission readiness reviews.

  4. Technology requirements and readiness for very large vehicles

    NASA Technical Reports Server (NTRS)

    Conner, D. W.

    1979-01-01

    Common concerns of very large vehicles in the areas of economics, transportation system interfaces and operational problems were reviewed regarding their influence on vehicle configurations and technology. Fifty-four technology requirements were identified which are judged to be unique, or particularly critical, to very large vehicles. The requirements were about equally divided among the four general areas of aero/hydrodynamics, propulsion and acoustics, structures, and vehicle systems and operations. The state of technology readiness was judged to be poor to fair for slightly more than one half of the requirements. In the classic disciplinary areas, the state of technology readiness appears to be more advanced than for vehicle systems and operations.

  5. 40 CFR 85.515 - Exemption provisions for intermediate age vehicles/engines.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... age vehicles/engines. 85.515 Section 85.515 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in question... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  6. 40 CFR 85.515 - Exemption provisions for intermediate age vehicles/engines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... age vehicles/engines. 85.515 Section 85.515 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in question... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  7. 40 CFR 85.515 - Exemption provisions for intermediate age vehicles/engines.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... age vehicles/engines. 85.515 Section 85.515 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in question... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  8. 40 CFR 85.515 - Exemption provisions for intermediate age vehicles/engines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... age vehicles/engines. 85.515 Section 85.515 Protection of Environment ENVIRONMENTAL PROTECTION AGENCY...-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in question... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  9. Skylab rescue space vehicle flight readiness test

    NASA Technical Reports Server (NTRS)

    Jevitt, S. J.

    1973-01-01

    A Skylab Rescue Space Vehicle flight readiness test is described which ensures that space vehicle systems are in a state of flight readiness and are compatible with associated ground support equipment. The functions of propellant loading, umbilical ejection, ignition, holddown arm release, liftoff, and service arm and tail service mast retraction are simulated. The test outline is presented along with a list of references, intercommunications information, operations interface control chart, and flight test.

  10. 40 CFR 1066.275 - Daily dynamometer readiness verification.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ...) AIR POLLUTION CONTROLS VEHICLE-TESTING PROCEDURES Dynamometer Specifications § 1066.275 Daily... automated process for this verification procedure, perform this evaluation by setting the initial speed and... your dynamometer does not perform this verification with an automated process: (1) With the dynamometer...

  11. 40 CFR 85.520 - Exemption provisions for outside useful life vehicles/engines.

    Code of Federal Regulations, 2012 CFR

    2012-07-01

    ... useful life vehicles/engines. 85.520 Section 85.520 Protection of Environment ENVIRONMENTAL PROTECTION... monitors to not-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  12. 40 CFR 85.520 - Exemption provisions for outside useful life vehicles/engines.

    Code of Federal Regulations, 2014 CFR

    2014-07-01

    ... useful life vehicles/engines. 85.520 Section 85.520 Protection of Environment ENVIRONMENTAL PROTECTION... monitors to not-ready status using an OBD scan tool appropriate for the OBD system in the vehicle/engine in... have reset to a ready status, you must submit an OBD scan tool report showing that with the vehicle...

  13. Boeing CST-100 Starliner Processing

    NASA Image and Video Library

    2018-04-26

    Boeing’s CST-100 Pad Abort Test Vehicle is almost ready to head to White Sands, New Mexico, to test the launch abort engines. During that test, the four abort engines will prove that the vehicle can safely perform an abort maneuver in the event of an emergency on the launchpad or during flight. The vehicle is mated to the service module for a fit check, and then the two will be taken apart for final preparations before heading to the desert.

  14. KENNEDY SPACE CENTER, FLA. -- Endeavour is ready to be rolled out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

    NASA Image and Video Library

    2004-01-09

    KENNEDY SPACE CENTER, FLA. -- Endeavour is ready to be rolled out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bay’s cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  15. Delphi`s DETOXSM process: Preparing to treat high organic content hazardous and mixed wastes

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Robertson, D.T.; Rogers, T.W.; Goldblatt, S.D.

    1998-12-31

    The US Department of Energy (DOE) Federal Energy Technology Center is sponsoring a full-scale technology demonstration of Delphi Research, Inc.`s patented DETOX{sup SM} catalytic wet chemical oxidation waste treatment process at the Savannah River Site (SRS) in South Carolina. The process is being developed primarily to treat hazardous and mixed wastes within the DOE complex as an alternative to incineration, but it has significant potential to treat wastes in the commercial sector. The results of the demonstration will be intensively studied and used to validate the technology. A critical objective in preparing for the demonstration was the successful completion ofmore » a programmatic Operational Readiness Review. Readiness Reviews are required by DOE for all new process startups. The Readiness Review provided the vehicle to ensure that Delphi was ready to start up and operate the DETOX{sup SM} process in the safest manner possible by implementing industry accepted management practices for safe operation. This paper provides an overview of the DETOX{sup SM} demonstration at SRS, and describes the crucial areas of the Readiness Review that marked the first steps in Delphi`s transition from a technology developer to an operating waste treatment services provider.« less

  16. NASA Agency Overview Briefing

    NASA Technical Reports Server (NTRS)

    2006-01-01

    The briefing opened with Dean Acosta (NASA Press Secretary) introducing Michael Griffin (NASA Administrator) and Bill Gerstenmaier (Associate Administrator for Space Operations). Bill Griffin stated that they would resume the Shuttle Fight to Return process, that the vehicle was remarkably clean and if the weather was good, the Shuttle would be ready to launch as scheduled. Bill Gerstenmaier stated that the preparations and processing of the vehicle went extremely well and they are looking forward to increasing the crew size to three. Then the floor was open to questions from the press.

  17. Connected Vehicle Pilot Deployment Program phase 1 : deployment readiness summary : New York City : final report.

    DOT National Transportation Integrated Search

    2016-09-09

    This document describes the Deployment Readiness Summary for the New York City (NYC) Connected Vehicle Pilot Deployment (CVPD) Project. It demonstrates the completion of Task 1-12 deliverables of Phase 1 by the NYC team. The document also addresses h...

  18. Ares Launch Vehicles Lean Practices Case Study

    NASA Technical Reports Server (NTRS)

    Doreswamy, Rajiv; Self, Timothy A.

    2007-01-01

    The Ares launch vehicles team, managed by the Ares Projects Office (APO) at NASA Marshall Space Flight Center, has completed the Ares I Crew Launch Vehicle System Requirements Review and System Definition Review and early design work for the Ares V Cargo Launch Vehicle. This paper provides examples of how Lean Manufacturing, Kaizen events, and Six Sigma practices are helping APO deliver a new space transportation capability on time and within budget, while still meeting stringent technical requirements. For example, Lean philosophies have been applied to numerous process definition efforts and existing process improvement activities, including the Ares I-X test flight Certificate of Flight Readiness (CoFR) process, risk management process, and review board organization and processes. Ares executives learned Lean practices firsthand, making the team "smart buyers" during proposal reviews and instilling the team with a sense of what is meant by "value-added" activities. Since the goal of the APO is to field launch vehicles at a reasonable cost and on an ambitious schedule, adopting Lean philosophies and practices will be crucial to the Ares Project's long-term SUCCESS.

  19. Saturn V First Stage (S-1C) Ready for Assembly AT KSC

    NASA Technical Reports Server (NTRS)

    1968-01-01

    This photograph shows the Saturn V first stage (S-1C) in the Vehicle Assembly Building at Kennedy Space Center ready to be mated with the second and third stages to complete the assembly of a Saturn V launch vehicle. This particular Saturn V was used for Apollo 6, which was a systems test flight. The towering 363-foot Saturn V was a multi-stage, multi-engine launch vehicle standing taller than the Statue of Liberty. Altogether, the Saturn V engines produced as much power as 85 Hoover Dams.

  20. Connected Vehicle Pilot Deployment Program phase 1 : deployment readiness summary : Tampa (THEA) : final report.

    DOT National Transportation Integrated Search

    2016-09-01

    The Tampa Hillsborough Expressway Authority (THEA) Connected Vehicle (CV) Pilot Deployment Program intends to develop a suite of applications that utilize vehicle-to-infrastructure (V2I) and vehicle-to-vehicle (V2V) communication technology to reduce...

  1. Connected Vehicle Pilot Deployment Program phase 1 : deployment readiness summary : ICF/Wyoming : final report.

    DOT National Transportation Integrated Search

    2016-09-13

    The Wyoming Department of Transportations (WYDOT) Connected Vehicle (CV) Pilot Deployment Program is intended to develop a suite of applications that utilize vehicle to infrastructure (V2I) and vehicle to vehicle (V2V) communication technology to ...

  2. Early Market TRL/MRL Analysis

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronnebro, Ewa; Stetson, Ned

    he focus of this report is TRL/MRL analysis of hydrogen storage; it documents the methodology and results of an effort to identify hydrogen storage technologies’ technical and manufacturing readiness for early market motive and non-motive applications and to provide a path forward toward commercialization. Motive applications include materials handling equipment (MHE) and ground support equipment (GSE), such as forklifts, tow tractors, and specialty vehicles such as golf carts, lawn mowers and wheel chairs. Non-motive applications are portable, stationary or auxiliary power units (APUs) and include portable laptops, backup power, remote sensor power, and auxiliary power for recreational vehicles, hotels, hospitals,more » etc. Hydrogen storage technologies assessed include metal hydrides, chemical hydrides, sorbents, gaseous storage, and liquid storage. The assessments are based on a combination of Technology Readiness Level (TRL) and Manufacturing Readiness Level (MRL) designations that enable evaluation of hydrogen storage technologies at varying levels of development. The manufacturing status could be established from eight risk elements: Technical Maturity, Design, Materials, Cost & Funding, Process Capability, Personnel, Facilities and Manufacturing Planning. This approach provides a logical methodology and roadmap to enable the identification of hydrogen storage technologies, their advantages/disadvantages, gaps and R&D needs on an unbiased and transparent scale that is easily communicated to interagency partners. This technology readiness assessment (TRA) report documents the process used to conduct the TRA/MRA (technology and manufacturing readiness assessment), reports the TRL and MRL for each assessed technology and provides recommendations based on the findings. To investigate the state of the art and needs to mature the technologies, PNNL prepared a questionnaire to assign TRL and MRL for each hydrogen storage technology. The questionnaire was sent to identified hydrogen storage technology developers and manufacturers who were asked to perform a self-assessment. We included both domestic and international organizations including U.S. national laboratories, U.S. companies, European companies and Japanese companies. PNNL collected the data and performed an analysis to deduce the level of maturity and to provide program recommendations.« less

  3. Safety pilot model deployment : lessons learned and recommendations for future connected vehicle activities.

    DOT National Transportation Integrated Search

    2015-09-01

    The Connected Vehicle Safety Pilot was a research program that demonstrated the readiness of DSRC-based connected vehicle safety applications for nationwide deployment. The vision of the Connected Vehicle Safety Pilot Program was to test connected ve...

  4. KSC-04pd0964

    NASA Image and Video Library

    2004-04-28

    KENNEDY SPACE CENTER, FLA. - Workers in the Orbiter Processing Facility get ready to remove Ground Support Equipment used to install Discovery’s nose cap on Friday. The nose cap had been removed from the vehicle in the summer of 2003 and returned to the vendor, where it underwent numerous forms of Non-Destructive Evaluation. These tests included X-ray, ultrasound and eddy current to ensure its structural integrity prior to installation on the vehicle. The nose cap was also recoated. Once returned to KSC, new Thermal Protection System blankets were assembled inside of the nose cap and thermography was performed prior to installation on the orbiter.

  5. Task 4 supporting technology. Part 2: Detailed test plan for thermal seals. Thermal seals evaluation, improvement and test. CAN8-1, Reusable Launch Vehicle (RLV), advanced technology demonstrator: X-33. Leading edge and seals thermal protection system technology demonstration

    NASA Technical Reports Server (NTRS)

    Hogenson, P. A.; Lu, Tina

    1995-01-01

    The objective is to develop the advanced thermal seals to a technology readiness level (TRL) of 6 to support the rapid turnaround time and low maintenance requirements of the X-33 and the future reusable launch vehicle (RLV). This program is divided into three subtasks: (1) orbiter thermal seals operation history review; (2) material, process, and design improvement; and (3) fabrication and evaluation of the advanced thermal seals.

  6. VANDENBERG AIR FORCE BASE, CALIF. - The L-1011 carrier aircraft is ready for flight after undergoing a Combined Systems Test, an integrated test involving the Pegasus launch vehicle, SciSat-1 spacecraft and L-1011 aircraft. The SciSat-1 weighs approximately 330 pounds and after launch will be placed in a 400-mile-high polar orbit to investigate processes that control the distribution of ozone in the upper atmosphere. The data from the satellite will provide Canadian and international scientists with improved measurements relating to global ozone processes and help policymakers assess existing environmental policy and develop protective measures for improving the health of our atmosphere, preventing further ozone depletion. The mission is designed to last two years.

    NASA Image and Video Library

    2003-08-09

    VANDENBERG AIR FORCE BASE, CALIF. - The L-1011 carrier aircraft is ready for flight after undergoing a Combined Systems Test, an integrated test involving the Pegasus launch vehicle, SciSat-1 spacecraft and L-1011 aircraft. The SciSat-1 weighs approximately 330 pounds and after launch will be placed in a 400-mile-high polar orbit to investigate processes that control the distribution of ozone in the upper atmosphere. The data from the satellite will provide Canadian and international scientists with improved measurements relating to global ozone processes and help policymakers assess existing environmental policy and develop protective measures for improving the health of our atmosphere, preventing further ozone depletion. The mission is designed to last two years.

  7. The new Mobile Command Center at KSC is important addition to emergency preparedness

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Charles Street, part of the Emergency Preparedness team at KSC, uses a phone on the specially equipped emergency response vehicle. The vehicle, nicknamed '''The Brute,''' serves as a mobile command center for emergency preparedness staff and other support personnel when needed. It features a conference room, computer work stations, mobile telephones and a fax machine. It also can generate power with its onboard generator. Besides being ready to respond in case of emergencies during launches, the vehicle must be ready to help address fires, security threats, chemical spills, terrorist attaches, weather damage or other critical situations that might face KSC or Cape Canaveral Air Force Station.

  8. KSC-00pp1572

    NASA Image and Video Library

    2000-09-21

    Charles Street, part of the Emergency Preparedness team at KSC, uses a phone on the specially equipped emergency response vehicle. The vehicle, nicknamed “The Brute,” serves as a mobile command center for emergency preparedness staff and other support personnel when needed. It features a conference room, computer work stations, mobile telephones and a fax machine. It also can generate power with its onboard generator. Besides being ready to respond in case of emergencies during launches, the vehicle must be ready to help address fires, security threats, chemical spills, terrorist attaches, weather damage or other critical situations that might face KSC or Cape Canaveral Air Force Station

  9. KSC00pp1572

    NASA Image and Video Library

    2000-09-21

    Charles Street, part of the Emergency Preparedness team at KSC, uses a phone on the specially equipped emergency response vehicle. The vehicle, nicknamed “The Brute,” serves as a mobile command center for emergency preparedness staff and other support personnel when needed. It features a conference room, computer work stations, mobile telephones and a fax machine. It also can generate power with its onboard generator. Besides being ready to respond in case of emergencies during launches, the vehicle must be ready to help address fires, security threats, chemical spills, terrorist attaches, weather damage or other critical situations that might face KSC or Cape Canaveral Air Force Station

  10. KSC-05PD-0527

    NASA Technical Reports Server (NTRS)

    2005-01-01

    KENNEDY SPACE CENTER, FLA. In the Vehicle Assembly Building at NASAs Kennedy Space Center, workers mate the External Tank, at left, to the underside of Space Shuttle Discovery, at right. Each of two aft external tank umbilical plates mate with a corresponding plate on the orbiter. The plates help maintain alignment among the umbilicals. The attach fitting is aft of the nose gear wheel well. Workers next will perform an electrical and mechanical verification of the mated interfaces to verify all critical vehicle connections. A Shuttle interface test is performed using the launch processing system to verify Space Shuttle vehicle interfaces and Space Shuttle vehicle-to-ground interfaces. In approximately one week, Space Shuttle Discovery will be ready for rollout to Launch Pad 39B for Return to Flight mission STS-114. The launch window for STS-114 is May 15 to June 3.

  11. KSC-00pp1575

    NASA Image and Video Library

    2000-09-21

    This camper-equipped truck known as “Old Blue” served as mobile field command center for the Emergency Preparedness team at KSC. It has been replaced with a larger vehicle that includes a conference room, computer work stations, mobile telephones and a fax machine, plus its own onboard generator. Besides being ready to respond in case of emergencies during launches, the vehicle must be ready to help address fires, security threats, chemical spills, terrorist attaches, weather damage or other critical situations that might face KSC or Cape Canaveral Air Force Station

  12. KSC-00pp1576

    NASA Image and Video Library

    2000-09-21

    This new specially equipped vehicle serves as a mobile command center for emergency preparedness staff and other support personnel when needed at KSC or Cape Canaveral Air Force Station. It features a conference room, computer work stations, mobile telephones and a fax machine. It also can generate power with its onboard generator. Besides being ready to respond in case of emergencies during launches, the vehicle must be ready to help address fires, security threats, chemical spills, terrorist attaches, weather damage or other critical situations that might face KSC or CCAFS

  13. KSC00pp1576

    NASA Image and Video Library

    2000-09-21

    This new specially equipped vehicle serves as a mobile command center for emergency preparedness staff and other support personnel when needed at KSC or Cape Canaveral Air Force Station. It features a conference room, computer work stations, mobile telephones and a fax machine. It also can generate power with its onboard generator. Besides being ready to respond in case of emergencies during launches, the vehicle must be ready to help address fires, security threats, chemical spills, terrorist attaches, weather damage or other critical situations that might face KSC or CCAFS

  14. KSC00pp1575

    NASA Image and Video Library

    2000-09-21

    This camper-equipped truck known as “Old Blue” served as mobile field command center for the Emergency Preparedness team at KSC. It has been replaced with a larger vehicle that includes a conference room, computer work stations, mobile telephones and a fax machine, plus its own onboard generator. Besides being ready to respond in case of emergencies during launches, the vehicle must be ready to help address fires, security threats, chemical spills, terrorist attaches, weather damage or other critical situations that might face KSC or Cape Canaveral Air Force Station

  15. Improving Inspection and Maintenance Performance and On-board Diagnostics Monitor Readiness Memo

    EPA Pesticide Factsheets

    This EPA memorandum transmits an updated list of vehicles that exhibit issues related to OBD (on board diagnostics) monitor readiness and makes suggestions for how Inspection/Maintenance (I/M) programs can improve operational performance by addressing

  16. The new Mobile Command Center at KSC is important addition to emergency preparedness

    NASA Technical Reports Server (NTRS)

    2000-01-01

    This new specially equipped vehicle serves as a mobile command center for emergency preparedness staff and other support personnel when needed at KSC or Cape Canaveral Air Force Station. It features a conference room, computer work stations, mobile telephones and a fax machine. It also can generate power with its onboard generator. Besides being ready to respond in case of emergencies during launches, the vehicle must be ready to help address fires, security threats, chemical spills, terrorist attaches, weather damage or other critical situations that might face KSC or CCAFS.

  17. KSC00pp1574

    NASA Image and Video Library

    2000-09-21

    Charles Street, Roger Scheidt and Robert ZiBerna, the Emergency Preparedness team at KSC, sit in the conference room inside the Mobile Command Center, a specially equipped vehicle. Nicknamed “The Brute,” it also features computer work stations, mobile telephones and a fax machine. It also can generate power with its onboard generator. Besides being ready to respond in case of emergencies during launches, the vehicle must be ready to help address fires, security threats, chemical spills, terrorist attaches, weather damage or other critical situations that might face KSC or Cape Canaveral Air Force Station

  18. KSC00pp1573

    NASA Image and Video Library

    2000-09-21

    Robert ZiBerna, Roger Scheidt and Charles Street, the Emergency Preparedness team at KSC, practice for an emergency scenario inside the Mobile Command Center, a specially equipped vehicle. It features a conference room, computer work stations, mobile telephones and a fax machine. It also can generate power with its onboard generator. Besides being ready to respond in case of emergencies during launches, the vehicle must be ready to help address fires, security threats, chemical spills, terrorist attaches, weather damage or other critical situations that might face KSC or Cape Canaveral Air Force Station

  19. KSC-00pp1574

    NASA Image and Video Library

    2000-09-21

    Charles Street, Roger Scheidt and Robert ZiBerna, the Emergency Preparedness team at KSC, sit in the conference room inside the Mobile Command Center, a specially equipped vehicle. Nicknamed “The Brute,” it also features computer work stations, mobile telephones and a fax machine. It also can generate power with its onboard generator. Besides being ready to respond in case of emergencies during launches, the vehicle must be ready to help address fires, security threats, chemical spills, terrorist attaches, weather damage or other critical situations that might face KSC or Cape Canaveral Air Force Station

  20. KSC-00pp1573

    NASA Image and Video Library

    2000-09-21

    Robert ZiBerna, Roger Scheidt and Charles Street, the Emergency Preparedness team at KSC, practice for an emergency scenario inside the Mobile Command Center, a specially equipped vehicle. It features a conference room, computer work stations, mobile telephones and a fax machine. It also can generate power with its onboard generator. Besides being ready to respond in case of emergencies during launches, the vehicle must be ready to help address fires, security threats, chemical spills, terrorist attaches, weather damage or other critical situations that might face KSC or Cape Canaveral Air Force Station

  1. The new Mobile Command Center at KSC is important addition to emergency preparedness

    NASA Technical Reports Server (NTRS)

    2000-01-01

    This camper-equipped truck known as '''Old Blue''' served as mobile field command center for the Emergency Preparedness team at KSC. It has been replaced with a larger vehicle that includes a conference room, computer work stations, mobile telephones and a fax machine, plus its own onboard generator. Besides being ready to respond in case of emergencies during launches, the vehicle must be ready to help address fires, security threats, chemical spills, terrorist attaches, weather damage or other critical situations that might face KSC or Cape Canaveral Air Force Station.

  2. 14 CFR 417.117 - Reviews.

    Code of Federal Regulations, 2011 CFR

    2011-01-01

    ... information: (i) Readiness of launch vehicle and payload. (ii) Readiness of any flight safety system and... of a launch safety review must ensure satisfaction of the following criteria: (i) A launch operator... operator must resolve all safety related action items. (ii) A launch operator must assign and certify...

  3. Project Fever - Fostering Electric Vehicle Expansion in the Rockies

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Swalnick, Natalia

    2013-06-30

    Project FEVER (Fostering Electric Vehicle Expansion in the Rockies) is a part of the Clean Cities Community Readiness and Planning for Plug-in Electric Vehicles and Charging Infrastructure Funding Opportunity funded by the U.S. Department of Energy (DOE) for the state of Colorado. Tasks undertaken in this project include: Electric Vehicle Grid Impact Assessment; Assessment of Electrical Permitting and Inspection for EV/EVSE (electric vehicle/electric vehicle supply equipment); Assessment of Local Ordinances Pertaining to Installation of Publicly Available EVSE;Assessment of Building Codes for EVSE; EV Demand and Energy/Air Quality Impacts Assessment; State and Local Policy Assessment; EV Grid Impact Minimization Efforts; Unificationmore » and Streamlining of Electrical Permitting and Inspection for EV/EVSE; Development of BMP for Local EVSE Ordinances; Development of BMP for Building Codes Pertaining to EVSE; Development of Colorado-Specific Assessment for EV/EVSE Energy/Air Quality Impacts; Development of State and Local Policy Best Practices; Create Final EV/EVSE Readiness Plan; Develop Project Marketing and Communications Elements; Plan and Schedule In-person Education and Outreach Opportunities.« less

  4. What determines the take-over time? An integrated model approach of driver take-over after automated driving.

    PubMed

    Zeeb, Kathrin; Buchner, Axel; Schrauf, Michael

    2015-05-01

    In recent years the automation level of driver assistance systems has increased continuously. One of the major challenges for highly automated driving is to ensure a safe driver take-over of the vehicle guidance. This must be ensured especially when the driver is engaged in non-driving related secondary tasks. For this purpose it is essential to find indicators of the driver's readiness to take over and to gain more knowledge about the take-over process in general. A simulator study was conducted to explore how drivers' allocation of visual attention during highly automated driving influences a take-over action in response to an emergency situation. Therefore we recorded drivers' gaze behavior during automated driving while simultaneously engaging in a visually demanding secondary task, and measured their reaction times in a take-over situation. According to their gaze behavior the drivers were categorized into "high", "medium" and "low-risk". The gaze parameters were found to be suitable for predicting the readiness to take-over the vehicle, in such a way that high-risk drivers reacted late and more often inappropriately in the take-over situation. However, there was no difference among the driver groups in the time required by the drivers to establish motor readiness to intervene after the take-over request. An integrated model approach of driver behavior in emergency take-over situations during automated driving is presented. It is argued that primarily cognitive and not motor processes determine the take-over time. Given this, insights can be derived for further research and the development of automated systems. Copyright © 2015 Elsevier Ltd. All rights reserved.

  5. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for NASA White Sands Test Facility

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schey, Stephen; Francfort, Jim

    This report focuses on the NASA White Sands Test Facility (WSTF) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements.

  6. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for National Institute of Health

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schey, Stephen; Francfort, Jim

    2014-11-01

    This report focuses on the National Institute of Health (NIH) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements.

  7. KSC-04pd0704

    NASA Image and Video Library

    2004-04-05

    KENNEDY SPACE CENTER, FLA. -- United Space Alliance (USA) technicians Mike Williams (left), Pearl Richardson (center) and R. Justin Hopmann get ready to lift the thermal blanket insulation into Discovery’s nose cap, which is under a protective cover and seated above on a work stand. The work is being done in a low bay area outside the Orbiter Processing Facility. Discovery is the orbiter named as the vehicle for Return to Flight with mission STS-114.

  8. KSC-04PD-0010

    NASA Technical Reports Server (NTRS)

    2004-01-01

    KENNEDY SPACE CENTER, FLA. -- Endeavour is ready to be rolled out of the Orbiter Processing Facility for temporary transfer to the Vehicle Assembly Building. The move allows work to be performed in the OPF that can only be accomplished while the bay is empty. Work scheduled in the OPF includes annual validation of the bays cranes, work platforms, lifting mechanisms and jack stands. Endeavour will remain in the VAB for approximately 12 days, then return to the OPF.

  9. Family System of Advanced Charring Ablators for Planetary Exploration Missions

    NASA Technical Reports Server (NTRS)

    Congdon, William M.; Curry, Donald M.

    2005-01-01

    Advanced Ablators Program Objectives: 1) Flight-ready(TRL-6) ablative heat shields for deep-space missions; 2) Diversity of selection from family-system approach; 3) Minimum weight systems with high reliability; 4) Optimized formulations and processing; 5) Fully characterized properties; and 6) Low-cost manufacturing. Definition and integration of candidate lightweight structures. Test and analysis database to support flight-vehicle engineering. Results from production scale-up studies and production-cost analyses.

  10. AVTA federal fleet PEV readiness data logging and characterization study for the National Park Service: Grand Canyon National Park

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schey, Stephen; Francfort, Jim; Nienhueser, Ian

    This report focuses on the Grand Canyon National Park (GCNP) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively PEVs) can fulfill the mission requirements.

  11. Fish-eye View of NASA Curiosity Rover and its Powered Descent Vehicle

    NASA Image and Video Library

    2011-11-23

    An engineer says goodbye to the Curiosity rover and its powered descent vehicle in the Jet Propulsion Laboratory Spacecraft Assembly Facility shortly before the spacecraft was readied for shipment to Kennedy Space Center for launch.

  12. Roadway system assessment using bluetooth-based automatic vehicle identification travel time data.

    DOT National Transportation Integrated Search

    2012-12-01

    This monograph is an exposition of several practice-ready methodologies for automatic vehicle identification (AVI) data collection : systems. This includes considerations in the physical setup of the collection system as well as the interpretation of...

  13. The new Mobile Command Center at KSC is important addition to emergency preparedness

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Charles Street, Roger Scheidt and Robert ZiBerna, the Emergency Preparedness team at KSC, sit in the conference room inside the Mobile Command Center, a specially equipped vehicle. Nicknamed '''The Brute,''' it also features computer work stations, mobile telephones and a fax machine. It also can generate power with its onboard generator. Besides being ready to respond in case of emergencies during launches, the vehicle must be ready to help address fires, security threats, chemical spills, terrorist attaches, weather damage or other critical situations that might face KSC or Cape Canaveral Air Force Station.

  14. The new Mobile Command Center at KSC is important addition to emergency preparedness

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Robert ZiBerna, Roger Scheidt and Charles Street, the Emergency Preparedness team at KSC, practice for an emergency scenario inside the Mobile Command Center, a specially equipped vehicle. It features a conference room, computer work stations, mobile telephones and a fax machine. It also can generate power with its onboard generator. Besides being ready to respond in case of emergencies during launches, the vehicle must be ready to help address fires, security threats, chemical spills, terrorist attaches, weather damage or other critical situations that might face KSC or Cape Canaveral Air Force Station.

  15. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for Department of Veterans Affairs – VA Manhattan Campus

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stephen Schey; Jim Francfort

    2014-10-01

    This report focuses on the Department of Veterans Affairs, VA Manhattan Campus (VA- Manhattan) fleet to identify the daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support successful introduction of plug-in electric vehicles (PEVs) into the agency’s fleet. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively called PEVs) can fulfill the mission requirements.

  16. STS-51 preparation: ACTS, ORFEUS, Discovery in VAB

    NASA Technical Reports Server (NTRS)

    1993-01-01

    In NASA's building AM on Cape Canaveral Air Force Station, STS-51 mission specialist Carl Walz (right) and Deutsche Aerospace technician Gregor Dawidowitsch check over the scientific instruments mounted on the Shuttle Pallet Satellite (SPAS) carrier (38573); The Orbiting and Retrievable Far and Extreme Ultraviolet Spectrometer (ORFEUS) and SPAS is readied for hoisting into a test cell at the Vertical Processing Facility (VPF) (38574); Mating of the Advanced Communications Technology Satellite (ACTS) with the Transfer Orbit Stage (TOS) booster is under way in the Payload Hazardous Servicing Facility (PHSF) (38575); The mated ACTS and TOS are ready to be moved from the PHSF to the Vertical Processsing Facility (VPF) (38576); The orbiter Discovery is rolled into the Vehicle Assembly Building (VAB) for mating with the external tank and twin solid rocket boosters (38577-8).

  17. STS-121: Discovery Post Flight Readiness Review Briefing

    NASA Technical Reports Server (NTRS)

    2006-01-01

    This post Flight Readiness Review (FRR) briefing begins with NASA Press Secretary Dean Acosta, introducing the panel who consist of: NASA Administrator, Dr. Michael Griffin; Associate Administrator for Space Operations, Bill Gerstenmaier; Space Shuttle Program Manager, Wayne Hale; and NASA Launch director, Mike Leinbach. The discussion begins with Dr. Michael Griffin, who expresses his gladness to be a part of the FRR. Bill Gerstenmaier talks about how they were very thorough about the subjects reviewed and that they wanted to make sure that they were ready to fly. He discusses and presents two slides. The first slide is a description of the LO2 intertank and LH2 ice/frost ramps staging location and the second are the top ten LH2 Ice/Frost Ramp Foam Loss events. Wayne Hale gives his thoughts on the human element that came into play during the FRRs. He talks about the willingness of everyone to speak their mind, instead of giving short comments. He expressed that this element is a huge step forward for NASA. Mike Leinbach reports on the processing of the vehicle and expresses that everything is going well and there is nothing to prohibit the launch. He also gives a good report on Atlantis, in case there is a need to use the vehicle. This FRR briefing ends with a short question and answer period from the press on topics such as debris, foam loss, ice/frost ramp redesign, crew risks, and launch date.

  18. Alternative Fuels Data Center: Plug-In Electric Vehicle Readiness Scorecard

    Science.gov Websites

    track progress toward PEV readiness. Get started evaluating your community. Create Account Log in to your account. Email Password Forgot your password? LOG IN Public reporting burden for this collection of information is estimated to average (20.5 hours) per response, including the time for reviewing

  19. Definition, technology readiness, and development cost of the orbit transfer vehicle engine integrated control and health monitoring system elements

    NASA Technical Reports Server (NTRS)

    Cannon, I.; Balcer, S.; Cochran, M.; Klop, J.; Peterson, S.

    1991-01-01

    An Integrated Control and Health Monitoring (ICHM) system was conceived for use on a 20 Klb thrust baseline Orbit Transfer Vehicle (OTV) engine. Considered for space used, the ICHM was defined for reusability requirements for an OTV engine service free life of 20 missions, with 100 starts and a total engine operational time of 4 hours. Functions were derived by flowing down requirements from NASA guidelines, previous OTV engine or ICHM documents, and related contracts. The elements of an ICHM were identified and listed, and these elements were described in sufficient detail to allow estimation of their technology readiness levels. These elements were assessed in terms of technology readiness level, and supporting rationale for these assessments presented. The remaining cost for development of a minimal ICHM system to technology readiness level 6 was estimated. The estimates are within an accuracy range of minus/plus 20 percent. The cost estimates cover what is needed to prepare an ICHM system for use on a focussed testbed for an expander cycle engine, excluding support to the actual test firings.

  20. NASA In-Space Propulsion Technologies and Their Infusion Potential

    NASA Technical Reports Server (NTRS)

    Anderson, David J.; Pencil,Eric J.; Peterson, Todd; Vento, Daniel; Munk, Michelle M.; Glaab, Louis J.; Dankanich, John W.

    2012-01-01

    The In-Space Propulsion Technology (ISPT) program has been developing in-space propulsion technologies that will enable or enhance NASA robotic science missions. The ISPT program is currently developing technology in four areas that include Propulsion System Technologies (Electric and Chemical), Entry Vehicle Technologies (Aerocapture and Earth entry vehicles), Spacecraft Bus and Sample Return Propulsion Technologies (components and ascent vehicles), and Systems/Mission Analysis. Three technologies are ready for flight infusion: 1) the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance; 2) NASA s Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system; and 3) Aerocapture technology development with investments in a family of thermal protection system (TPS) materials and structures; guidance, navigation, and control (GN&C) models of blunt-body rigid aeroshells; and aerothermal effect models. Two component technologies that will be ready for flight infusion in the near future will be Advanced Xenon Flow Control System, and ultra-lightweight propellant tank technologies. Future focuses for ISPT are sample return missions and other spacecraft bus technologies like: 1) Mars Ascent Vehicles (MAV); 2) multi-mission technologies for Earth Entry Vehicles (MMEEV) for sample return missions; and 3) electric propulsion for sample return and low cost missions. These technologies are more vehicle-focused, and present a different set of technology infusion challenges. While the Systems/Mission Analysis area is focused on developing tools and assessing the application of propulsion technologies to a wide variety of mission concepts. These in-space propulsion technologies are applicable, and potentially enabling for future NASA Discovery, New Frontiers, and sample return missions currently under consideration, as well as having broad applicability to potential Flagship missions. This paper provides a brief overview of the ISPT program, describing the development status and technology infusion readiness of in-space propulsion technologies in the areas of electric propulsion, aerocapture, Earth entry vehicles, propulsion components, Mars ascent vehicle, and mission/systems analysis.

  1. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the National Park Service: Sleeping Bear Dunes National Lakeshore

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schey, Stephen; Francfort, Jim

    This report focuses on the Sleeping Bear Dunes National Lakeshore (SLBE) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle (BEV) or plug-in hybrid electric vehicle (PHEV) (collectively plug-in electric vehicles, or PEVs) can fulfill the mission requirements.

  2. Atmospheric electricity criteria guidelines for use in aerospace vehicle development

    NASA Technical Reports Server (NTRS)

    Daniels, G. E.

    1972-01-01

    Lightning has always been of concern for aerospace vehicle ground activities. The unexpected triggering of lightning discharges by the Apollo 12 space vehicle shortly after launch and the more recent repeated lightning strikes to the launch umbilical tower while the Apollo 15 space vehicle was being readied for launch have renewed interest in studies of atmospheric electricity as it relates to space vehicle missions. The material presented reflects some of the results of these studies with regard to updating the current criteria guidelines.

  3. Rapid Airlift Planning for Amphibious-Ready Groups

    DTIC Science & Technology

    2015-09-01

    SUBJECT TERMS vehicle routing problem , vehicle synchronization, military airlift, passenger and cargo transport, helicopter routing 15. NUMBER OF PAGES...Southern California VBA Visual Basic for Applications VRP Vehicle Routing Problem xiv THIS PAGE INTENTIONALLY LEFT BLANK xv EXECUTIVE...Depending on the ICAO+ to ICAO+ distance-over-the-water (DOW), aircraft may require section support. DOW is the great- circle distance travelled

  4. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for Department of Health and Human Services – ASPR

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schey, Steve; Francfort, Jim

    2015-06-01

    This report focuses on the Department of Health and Human Services, Assistant Secretary for Preparedness and Response fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agency’s fleet. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively referred to as PEVs) can fulfill the mission requirements.

  5. Corrosion Control of Central Vehicle Wash Facility Pump Components Using Alternative Alloy Coatings

    DTIC Science & Technology

    2016-07-01

    military installations are es- sential for supporting the readiness of tactical vehicles. Steel wash-rack pumps are vulnerable to accelerated...Management Command (IMCOM). The technical monitors were Daniel J. Dunmire (OUSD(AT&L)), Bernie Rodriguez (IMPW-FM), and Valerie D. Hines (DAIM-ODF...statement Large steel water pumps are used to pump water into the Central Vehicle Wash Facility (CVWF) for vehicle washing at Fort Polk, LA. The interior

  6. Integrated vehicle-based safety systems light-vehicle on-road test report

    DOT National Transportation Integrated Search

    2008-08-01

    This report presents results from a series of on-road verification tests performed to determine the readiness of a prototype : integrated warning system to advance to field testing, as well as to identify areas of system performance that should be im...

  7. DSCOVR Spacecraft Arrival, Offload, & Unpacking

    NASA Image and Video Library

    2014-11-20

    NOAA’s Deep Space Climate Observatory spacecraft, or DSCOVR, has been uncovered and is ready for processing in the high bay of Building 1 at the Astrotech payload processing facility in Titusville, Florida, near Kennedy Space Center. DSCOVR is a partnership between NOAA, NASA and the U.S. Air Force. DSCOVR will maintain the nation's real-time solar wind monitoring capabilities which are critical to the accuracy and lead time of NOAA's space weather alerts and forecasts. Launch is currently scheduled for January 2015 aboard a SpaceX Falcon 9 v 1.1 launch vehicle from Cape Canaveral Air Force Station, Florida.

  8. Yersinia enterocolitica Outbreak Associated with Ready-to-Eat Salad Mix, Norway, 2011

    PubMed Central

    Heier, Berit Tafjord; Nygård, Karin; Stalheim, Torunn; Cudjoe, Kofitsyo S.; Skjerdal, Taran; Wester, Astrid Louise; Lindstedt, Bjørn-Arne; Stavnes, Trine-Lise; Vold, Line

    2012-01-01

    In 2011, an outbreak of illness caused by Yersinia enterocolitica O:9 in Norway was linked to ready-to-eat salad mix, an unusual vehicle for this pathogen. The outbreak illustrates the need to characterize isolates of this organism, and reinforces the need for international traceback mechanisms for fresh produce. PMID:22932318

  9. Analysis of Evaporative On-Board Diagnostic (OBD) Readiness and DTCs Using I/M Data

    EPA Science Inventory

    Gasoline vehicles are equipped with evaporative emissions control systems that control vapor from the fuel storage system while a vehicle is sitting or driving. When these systems or the vehicle’s gasoline delivery system malfunction, excessive evaporative emissions can be emitte...

  10. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for NASA Glenn Research Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schey, Stephen; Francfort, Jim

    The Advanced Vehicle Testing Activity’s study seeks to collect and evaluate data to validate the utilization of advanced plug-in electric vehicle (PEV) transportation. This report focuses on the NASA Glenn Research Center (GRC) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively referred to as PEVs) can fulfill the mission requirements.

  11. Internal ODOT survey on attitudes and readiness for connected and autonomous vehicles as part of preparing a possible Oregon road map for connected vehicle/cooperative systems deployment scenarios : task 1 report : SPR 764.

    DOT National Transportation Integrated Search

    2016-04-01

    The goal of this project was to lay the groundwork for Oregon to be prepared to lead in the : implementation of a connected vehicle/cooperative systems transportation portfolio, and/or to avoid being caught : by surprise as developments in this area ...

  12. KSC-04pd1972

    NASA Image and Video Library

    2004-09-23

    KENNEDY SPACE CENTER, FLA. - Herman Everett is ready to explain the use of hydrogen in a fuel cell vehicle during an exhibit by the Ford Motor Company of their modified Ford Focus. The exhibit was a response to inquiries about fuel cell vehicles during KSC’s Environmental and Energy Awareness week in April 2004.

  13. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for Department of Veterans Affairs. James J. Peters VA Medical Center, Bronx, NY

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schey, Stephen; Francfort, Jim

    This report focuses on the Department of Veterans Affairs, James J. Peters VA Medical Center (VA - Bronx) fleet to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (collectively referred to as PEVs) can fulfill the mission requirements.

  14. Tool Helps Utilities Assess Readiness for Electric Vehicle Charging (Fact Sheet)

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Not Available

    NREL research helps answer a fundamental question regarding electric vehicles: Is the grid ready to handle them? Environmental, economic and security concerns regarding oil consumption make electrifying the transportation sector a high national priority. NREL's Center for Transportation Technologies & Systems (CTTS) has developed a framework for utilities to evaluate the plug-in vehicle (PEV) readiness of distribution transformers. Combining a wealth of vehicle performance statistics with load data from partner utilities including the Hawaiian Electric Company and Xcel Energy, NREL analyzed the thermal loading characteristics of distribution transformers due to vehicle charging. After running millions of simulations replicating varying climatesmore » and conditions, NREL is now able to predict aging rates for transformers when PEVs are added to existing building loads. With the NREL tool, users define simulation parameters by inputting vehicle trip and weather data; transformer load profiles and ratings; PEV penetration, charging rates and battery sizes; utility rates; the number of houses on each transformer; and public charging availability. Transformer load profiles, drive cycles, and ambient temperature data are then run through the thermal model to produce a one-year timeseries of the hotspot temperature. Annual temperature durations are calculated to help determine the annual aging rate. Annual aging rate results are grouped by independent variables. The most useful measure is transformer mileage, a measure of how many electrically-driven miles must be supplied by the transformer. Once the spectrum analysis has been conducted for an area or utility, the outputs can be used to help determine if more detailed evaluation is necessary, or if transformer replacement is required. In the majority of scenarios, transformers have enough excess capacity to charge PEVs. Only in extreme cases does vehicle charging have negative long-term impact on transformers. In those cases, upgrades to larger transformers would be recommended. NREL analysis also showed opportunity for newly-installed smart grids to offset distribution demands by time-shifting the charging loads. Most importantly, the model demonstrated synergies between PEVs and distributed renewables, not only providing clean renewable energy for vehicles, but also reducing demand on the entire distribution infrastructure by supplying loads at the point of consumption.« less

  15. Alternative Fuels Data Center: Pennsylvania Transportation Data for

    Science.gov Websites

    /TTIwZrpNGf4 Video thumbnail for Pennsylvania School Buses Run on Natural Gas Pennsylvania School Buses Run on Network, Clean School Bus/Vehicle Incentive, and Green Jobs Outreach Program Independence National Partnership for Promoting Natural Gas Vehicles Ready to Roll! - Southeastern Pennsylvania's Regional Electric

  16. KSC-2010-4397

    NASA Image and Video Library

    2010-08-18

    CAPE CANAVERAL, Fla. -- In the Space Station Processing Facility at NASA's Kennedy Space Center in Florida, shipping containers packed with tools and flight support equipment for orbital replacement units are ready for their trip to the Japanese Aerospace Exploration Agency's Tanegashima Space Center. There, the six units, including the flex hose rotary coupler, will be processed for launch to the International Space Station aboard HTV-2, scheduled for Jan. 20, 2011. HTV-2 is an uncrewed cargo transporter that will be launched by the H-IIB launch vehicle. It is designed to deliver up to 6 tons of supplies, including food, clothes and experiment devices to the space station. Photo credit: NASA/Jack Pfaller

  17. Analysis of Unmanned Undersea Vehicle (UUV) Architectures and an Assessment of UUV Integration into Undersea Applications

    DTIC Science & Technology

    2010-09-01

    Synthetic Long Baseline SSS Side Scan Sonar TCS Time Critical Strike TRL Technology Readiness Level U.S. United States UHF Ultra High...Frequency UN United Nation USBL Ultra Short Baseline UUV Unmanned Undersea Vehicle UUVMP Unmanned Undersea Vehicle Master Plan V Volts...Wilmington, “NURC/SEGM Capabilities: Deepwater AUV,” University of North Carolina Wilmington Web site [Online], Available: http://www.uncw.edu/nurc/auv

  18. Vehicle health management for guidance, navigation and control systems

    NASA Technical Reports Server (NTRS)

    Radke, Kathleen; Frazzini, Ron; Bursch, Paul; Wald, Jerry; Brown, Don

    1993-01-01

    The objective of the program was to architect a vehicle health management (VHM) system for space systems avionics that assures system readiness for launch vehicles and for space-based dormant vehicles. The platforms which were studied and considered for application of VHM for guidance, navigation and control (GN&C) included the Advanced Manned Launch System (AMLS), the Horizontal Landing-20/Personnel Launch System (HL-20/PLS), the Assured Crew Return Vehicle (ACRV) and the Extended Duration Orbiter (EDO). This set was selected because dormancy and/or availability requirements are driving the designs of these future systems.

  19. Energy management and vehicle synthesis

    NASA Astrophysics Data System (ADS)

    Czysz, P.; Murthy, S. N. B.

    The major drivers in the development of launch vehicles for the twenty-first century are reduction in cost of vehicles and operations, continuous reusability, mission abort capability with vehicle recovery, and readiness. One approach to the design of such vehicles is to emphasize energy management and propulsion as being the principal means of improvements given the available industrial capability and the required freedom in selecting configuration concept geometries. A methodology has been developed for the rational synthesis of vehicles based on the setting up and utilization of available data and projections, and a reference vehicle. The application of the methodology is illustrated for a single stage to orbit (SSTO) with various limits for the use of airbreathing propulsion.

  20. Energy management and vehicle synthesis

    NASA Technical Reports Server (NTRS)

    Czysz, P.; Murthy, S. N. B.

    1995-01-01

    The major drivers in the development of launch vehicles for the twenty-first century are reduction in cost of vehicles and operations, continuous reusability, mission abort capability with vehicle recovery, and readiness. One approach to the design of such vehicles is to emphasize energy management and propulsion as being the principal means of improvements given the available industrial capability and the required freedom in selecting configuration concept geometries. A methodology has been developed for the rational synthesis of vehicles based on the setting up and utilization of available data and projections, and a reference vehicle. The application of the methodology is illustrated for a single stage to orbit (SSTO) with various limits for the use of airbreathing propulsion.

  1. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study: Final Report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schey, Stephen; Francfort, Jim

    2015-06-01

    Collect and evaluate data on federal fleet operations as part of the Advanced Vehicle Testing Activity’s Federal Fleet Vehicle Data Logging and Characterization Study. The Advanced Vehicle Testing Activity study seeks to collect and evaluate data to validate the utilization of advanced plug-in electric vehicle (PEV) transportation. This report summarizes the fleets studied to identify daily operational characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of PEVs into the agencies’ fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a batterymore » electric vehicle or plug-in hybrid electric vehicle (collectively referred to as PEVs) can fulfill the mission requirements.« less

  2. View of the Apollo 10 space vehicle at Pad B, ready for launch

    NASA Technical Reports Server (NTRS)

    1969-01-01

    Ground-level view at sunset of the Apollo 10 (Spacecraft 106/Lunar Module 4/Saturn 505) space vehicle at Pad B, Launch Complex 39, Kennedy Space Center. The Apollo 10 stack had just been positioned after being rolled out from the Vehicle Assemble Building (VAB) (34318); View of the Apollo 10 space vehicle (through palm trees and across water) on the way from the VAB to Pad B, Launch Complex 39. The Saturn V and its mobile launch tower are atop a crawler-transporter (34319).

  3. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for NASA Stennis Space Center

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schey, Stephen; Francfort, Jim

    Federal agencies are mandated to purchase alternative fuel vehicles, increase consumption of alternative fuels, and reduce petroleum consumption. Available plug-in electric vehicles (PEVs) provide an attractive option in the selection of alternative fuel vehicles. PEVs, which consist of both battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), have significant advantages over internal combustion engine (ICE) vehicles in terms of energy efficiency, reduced petroleum consumption, and reduced production of greenhouse gas (GHG) emissions, and they provide performance benefits with quieter, smoother operation. This study intended to evaluate the extent to which NASA Stennis Space Center (Stennis) could convert partmore » or all of their fleet of vehicles from petroleum-fueled vehicles to PEVs.« less

  4. Orbit transfer rocket engine integrated control and health monitoring system technology readiness assessment

    NASA Technical Reports Server (NTRS)

    Bickford, R. L.; Collamore, F. N.; Gage, M. L.; Morgan, D. B.; Thomas, E. R.

    1992-01-01

    The objectives of this task were to: (1) estimate the technology readiness of an integrated control and health monitoring (ICHM) system for the Aerojet 7500 lbF Orbit Transfer Vehicle engine preliminary design assuming space based operations; and (2) estimate the remaining cost to advance this technology to a NASA defined 'readiness level 6' by 1996 wherein the technology has been demonstrated with a system validation model in a simulated environment. The work was accomplished through the conduct of four subtasks. In subtask 1 the minimally required functions for the control and monitoring system was specified. The elements required to perform these functions were specified in Subtask 2. In Subtask 3, the technology readiness level of each element was assessed. Finally, in Subtask 4, the development cost and schedule requirements were estimated for bringing each element to 'readiness level 6'.

  5. Aft Skirt Electrical Umbilical (ASEU) and Vehicle Support Post (

    NASA Image and Video Library

    2016-12-09

    A flatbed truck carries a vertical support post (VSP) for NASA's Space Launch System (SLS) rocket to the Mobile Launcher Yard at NASA's Kennedy Space Center in Florida. The two aft skirt electrical umbilicals (ASEUs) and the first of the vehicle support posts underwent a series of tests to confirm they are functioning properly and ready to support the SLS for launch. The ASEUs will connect to the SLS rocket at the bottom outer edge of each booster and provide electrical power and data connections to the rocket until it lifts off from the launch pad. The eight VSPs will support the load of the solid rocket boosters, with four posts for each of the boosters. The center’s Engineering Directorate and the Ground Systems Development and Operations Program are overseeing processing and testing of the umbilicals.

  6. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for United States Coast Guard Headquarters

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Schey, Stephen; Francfort, Jim

    2015-05-01

    Federal agencies are mandated to purchase alternative fuel vehicles, increase consumption of alternative fuels, and reduce petroleum consumption. Available plug-in electric vehicles (PEVs) provide an attractive option in the selection of alternative fuel vehicles. PEVs, which consist of both battery electric vehicles (BEVs) and plug-in hybrid electric vehicles (PHEVs), have significant advantages over internal combustion engine (ICE) vehicles in terms of energy efficiency, reduced petroleum consumption, and reduced production of greenhouse gas (GHG) emissions, and they provide performance benefits with quieter, smoother operation. This study intended to evaluate the extent to which the United States Coast Guard Headquarters (USCG HQ)more » could convert part or all of their fleet of vehicles from petroleum-fueled vehicles to PEVs.« less

  7. A manufacturing database of advanced materials used in spacecraft structures

    NASA Technical Reports Server (NTRS)

    Bao, Han P.

    1994-01-01

    Cost savings opportunities over the life cycle of a product are highest in the early exploratory phase when different design alternatives are evaluated not only for their performance characteristics but also their methods of fabrication which really control the ultimate manufacturing costs of the product. In the past, Design-To-Cost methodologies for spacecraft design concentrated on the sizing and weight issues more than anything else at the early so-called 'Vehicle Level' (Ref: DOD/NASA Advanced Composites Design Guide). Given the impact of manufacturing cost, the objective of this study is to identify the principal cost drivers for each materials technology and propose a quantitative approach to incorporating these cost drivers into the family of optimization tools used by the Vehicle Analysis Branch of NASA LaRC to assess various conceptual vehicle designs. The advanced materials being considered include aluminum-lithium alloys, thermoplastic graphite-polyether etherketone composites, graphite-bismaleimide composites, graphite- polyimide composites, and carbon-carbon composites. Two conventional materials are added to the study to serve as baseline materials against which the other materials are compared. These two conventional materials are aircraft aluminum alloys series 2000 and series 7000, and graphite-epoxy composites T-300/934. The following information is available in the database. For each material type, the mechanical, physical, thermal, and environmental properties are first listed. Next the principal manufacturing processes are described. Whenever possible, guidelines for optimum processing conditions for specific applications are provided. Finally, six categories of cost drivers are discussed. They include, design features affecting processing, tooling, materials, fabrication, joining/assembly, and quality assurance issues. It should be emphasized that this database is not an exhaustive database. Its primary use is to make the vehicle designer aware of some of the most important aspects of manufacturing associated with his/her choice of the structural materials. The other objective of this study is to propose a quantitative method to determine a Manufacturing Complexity Factor (MCF) for each material being contemplated. This MCF is derived on the basis of the six cost drivers mentioned above plus a Technology Readiness Factor which is very closely related to the Technology Readiness Level (TRL) as defined in the Access To Space final report. Short of any manufacturing information, our MCF is equivalent to the inverse of TRL. As more manufacturing information is available, our MCF is a better representation (than TRL) of the fabrication processes involved. The most likely application for MCF is in cost modeling for trade studies. On-going work is being pursued to expand the potential applications of MCF.

  8. A manufacturing database of advanced materials used in spacecraft structures

    NASA Astrophysics Data System (ADS)

    Bao, Han P.

    1994-12-01

    Cost savings opportunities over the life cycle of a product are highest in the early exploratory phase when different design alternatives are evaluated not only for their performance characteristics but also their methods of fabrication which really control the ultimate manufacturing costs of the product. In the past, Design-To-Cost methodologies for spacecraft design concentrated on the sizing and weight issues more than anything else at the early so-called 'Vehicle Level' (Ref: DOD/NASA Advanced Composites Design Guide). Given the impact of manufacturing cost, the objective of this study is to identify the principal cost drivers for each materials technology and propose a quantitative approach to incorporating these cost drivers into the family of optimization tools used by the Vehicle Analysis Branch of NASA LaRC to assess various conceptual vehicle designs. The advanced materials being considered include aluminum-lithium alloys, thermoplastic graphite-polyether etherketone composites, graphite-bismaleimide composites, graphite- polyimide composites, and carbon-carbon composites. Two conventional materials are added to the study to serve as baseline materials against which the other materials are compared. These two conventional materials are aircraft aluminum alloys series 2000 and series 7000, and graphite-epoxy composites T-300/934. The following information is available in the database. For each material type, the mechanical, physical, thermal, and environmental properties are first listed. Next the principal manufacturing processes are described. Whenever possible, guidelines for optimum processing conditions for specific applications are provided. Finally, six categories of cost drivers are discussed. They include, design features affecting processing, tooling, materials, fabrication, joining/assembly, and quality assurance issues. It should be emphasized that this database is not an exhaustive database. Its primary use is to make the vehicle designer aware of some of the most important aspects of manufacturing associated with his/her choice of the structural materials. The other objective of this study is to propose a quantitative method to determine a Manufacturing Complexity Factor (MCF) for each material being contemplated. This MCF is derived on the basis of the six cost drivers mentioned above plus a Technology Readiness Factor which is very closely related to the Technology Readiness Level (TRL) as defined in the Access To Space final report. Short of any manufacturing information, our MCF is equivalent to the inverse of TRL. As more manufacturing information is available, our MCF is a better representation (than TRL) of the fabrication processes involved.

  9. KSC-2014-4568

    NASA Image and Video Library

    2014-11-20

    CAPE CANAVERAL, Fla. – NOAA’s Deep Space Climate Observatory spacecraft, or DSCOVR, has been uncovered and is ready for processing in the high bay of Building 1 at the Astrotech payload processing facility in Titusville, Florida, near Kennedy Space Center. DSCOVR is a partnership between NOAA, NASA and the U.S. Air Force. DSCOVR will maintain the nation's real-time solar wind monitoring capabilities which are critical to the accuracy and lead time of NOAA's space weather alerts and forecasts. Launch is currently scheduled for January 2015 aboard a SpaceX Falcon 9 v 1.1 launch vehicle from Cape Canaveral Air Force Station, Florida. To learn more about DSCOVR, visit http://www.nesdis.noaa.gov/DSCOVR. Photo credit: NASA/Kim Shiflett

  10. X-24C research vehicle

    NASA Technical Reports Server (NTRS)

    1974-01-01

    A group of experiments that might be accomplished on the X-24C research vehicle are discussed indicating in each case the technology development needed to ready the experiments for flight, and also indicating interface problems between the vehicle and the experiment. Experiments that could be cheaply done using test platforms other than the X-24C have been eliminated. Experiments that are clearly applicable only to the X-24C research vehicle are, of course, included. Experiments that might be accomplished on either the X-24C or some other platform requiring further investigation concerning proper applicability are included for consideration.

  11. NASA's Space Launch System: Progress Toward the Proving Ground

    NASA Technical Reports Server (NTRS)

    Jackman, Angie; Johnson, Les

    2017-01-01

    With significant and substantial progress being accomplished toward readying the Space Launch System (SLS) rocket for its first test flight, work is already also underway on preparations for the second flight - using an upgraded version of the vehicle - and beyond. SLS is the most powerful human-rated launch vehicle the United States has ever undertaken, and together with the Orion spacecraft will support human exploration missions into the proving ground of cislunar space and ultimately to Mars. This paper will provide a description of the SLS vehicle, and an overview of the vehicle's capabilities and utilization potential.

  12. LDSD Ready for Launch

    NASA Image and Video Library

    2015-06-05

    NASA's Low-Density Supersonic Decelerator (LDSD) hangs from a launch tower at U.S. Navy's Pacific Missile Range Facility in Kauai, Hawaii. The saucer-shaped vehicle will test two devices for landing heavy payloads on Mars: an inflatable donut-shaped device and a supersonic parachute. The launch tower helps link the vehicle to a balloon; once the balloon floats up, the vehicle is released from the tower and the balloon carries it to high altitudes. The vehicle's rocket takes it to even higher altitudes, to the top of the stratosphere, where the supersonic test begins. http://photojournal.jpl.nasa.gov/catalog/PIA19342

  13. Saturn V Vehicle for the Apollo 4 Mission in the Vehicle Assembly Building

    NASA Technical Reports Server (NTRS)

    1967-01-01

    This photograph depicts the Saturn V vehicle (SA-501) for the Apollo 4 mission in the Vehicle Assembly Building (VAB) at the Kennedy Space Center (KSC). After the completion of the assembly operation, the work platform was retracted and the vehicle was readied to rollout from the VAB to the launch pad. The Apollo 4 mission was the first launch of the Saturn V launch vehicle. Objectives of the unmanned Apollo 4 test flight were to obtain flight information on launch vehicle and spacecraft structural integrity and compatibility, flight loads, stage separation, and subsystems operation including testing of restart of the S-IVB stage, and to evaluate the Apollo command module heat shield. The Apollo 4 was launched on November 9, 1967 from KSC.

  14. NREL, Toyota Partnering on Plug-In Hybrid Electric Vehicle Grid Integration

    Science.gov Websites

    find out how all those new vehicles charging up at the same time will affect power quality on the distribution grid. Knowing how much is too much for the grid will lead to better strategies to monitor and control distribution, ensuring that as more PHEV owners plug in, the grid is ready. To learn more about

  15. Hydrocarbon Fuel Thermal Performance Modeling based on Systematic Measurement and Comprehensive Chromatographic Analysis

    DTIC Science & Technology

    2016-07-27

    is a common requirement for aircraft, rockets , and hypersonic vehicles. The Aerospace Fuels Quality Test and Model Development (AFQTMoDev) project...was initiated to mature fuel quality assurance practices for rocket grade kerosene, thereby ensuring operational readiness of conventional and...and reliability, is a common requirement for aircraft, rockets , and hypersonic vehicles. The Aerospace Fuels Quality Test and Model Development

  16. Initial Assessment of the Ares I-X Launch Vehicle Upper Stage to Vibroacoustic Flight Environments

    NASA Technical Reports Server (NTRS)

    Larko, Jeffrey M.; Hughes, William O.

    2008-01-01

    The Ares I launch vehicle will be NASA s first new launch vehicle since 1981. Currently in design, it will replace the Space Shuttle in taking astronauts to the International Space Station, and will eventually play a major role in humankind s return to the Moon and eventually to Mars. Prior to any manned flight of this vehicle, unmanned test readiness flights will be flown. The first of these readiness flights, named Ares I-X, is scheduled to be launched in April 2009. The NASA Glenn Research Center is responsible for the design, manufacture, test and analysis of the Ares I-X upper stage simulator (USS) element. As part of the design effort, the structural dynamic response of the Ares I-X launch vehicle to its vibroacoustic flight environments must be analyzed. The launch vehicle will be exposed to extremely high acoustic pressures during its lift-off and aerodynamic stages of flight. This in turn will cause high levels of random vibration on the vehicle's outer surface that will be transmitted to its interior. Critical flight equipment, such as its avionics and flight guidance components are susceptible to damage from this excitation. This study addresses the modelling, analysis and predictions from examining the structural dynamic response of the Ares I-X upper stage to its vibroacoustic excitations. A statistical energy analysis (SEA) model was used to predict the high frequency response of the vehicle at locations of interest. Key to this study was the definition of the excitation fields corresponding to lift off acoustics and the unsteady aerodynamic pressure fluctuations during flight. The predicted results will be used by the Ares I-X Project to verify the flight qualification status of the Ares I-X upper stage components.

  17. KSC-03pd0150

    NASA Image and Video Library

    2003-01-16

    KENNEDY SPACE CENTER, FLA. - In the Multi-Purpose Processing Facility, the Pegasus launch vehicle is ready for installation of the Solar Radiation and Climate Experiment (SORCE) satellite. Built by Orbital Sciences Corporation (OSC), SORCE will study and measure solar irradiance as a source of energy in the Earth's atmosphere. The launch of SORCE is scheduled for Jan. 25 at 3:14 p.m. from Cape Canaveral Air Force Station, Fla. The drop of the Pegasus will be from OSC's L-1011 aircraft at an altitude of 39,000 feet over the Atlantic Ocean approximately 100 miles east-southeast of Cape Canaveral.

  18. KSC-03pd0156

    NASA Image and Video Library

    2003-01-16

    KENNEDY SPACE CENTER, FLA. -- In the Multi-Purpose Processing Facility, the Pegasus XL launch vehicle is ready for installation of the Solar Radiation and Climate Experiment (SORCE) satellite after encapsulation. Built by Orbital Sciences Corporation (OSC), SORCE will study and measure solar irradiance as a source of energy in the Earth's atmosphere. The launch of SORCE is scheduled for Jan. 25 at 3:14 p.m. from Cape Canaveral Air Force Station, Fla. The drop of the Pegasus will be from OSC's L-1011 aircraft at an altitude of 39,000 feet over the Atlantic Ocean approximately 100 miles east-southeast of Cape Canaveral.

  19. KSC-02pd1949

    NASA Image and Video Library

    2002-12-17

    KENNEDY SPACE CENTER, FLA. -- Workers at the Cape Canaveral Air Force Station Skid Strip get ready to remove the Pegasus XL Expendable Launch Vehicle attached underneath the Orbital Sciences L-1011 aircraft. The Pegasus will be transported to the Multi-Payload Processing Facility for testing and verification. The Pegasus will undergo three flight simulations prior to its scheduled launch in late January 2003. The Pegasus XL will carry NASA's Solar Radiation and Climate Experiment (SORCE) into orbit. Built by Orbital Sciences Space Systems Group, SORCE will study and measure solar irradiance as a source of energy in the Earth's atmosphere. .

  20. KSC-03pd0165

    NASA Image and Video Library

    2003-01-16

    KENNEDY SPACE CENTER, FLA. -- In the Multi-Purpose Processing Facility, the Pegasus XL launch vehicle is ready to be moved toward the Solar Radiation and Climate Experiment (SORCE) satellite in front of it. Built by Orbital Sciences Corporation (OSC), SORCE will study and measure solar irradiance as a source of energy in the Earth's atmosphere. The launch of SORCE is scheduled for Jan. 25 at 3:14 p.m. from Cape Canaveral Air Force Station, Fla. The drop of the Pegasus will be from OSC's L-1011 aircraft at an altitude of 39,000 feet over the Atlantic Ocean approximately 100 miles east-southeast of Cape Canaveral.

  1. Formation Flying for Satellites and Unmanned Aerial Vehicles

    NASA Technical Reports Server (NTRS)

    Merrill, Garrick

    2015-01-01

    The shrinking size of satellites and unmanned aerial vehicles (UAVs) is enabling lower cost missions. As sensors and electronics continue to downsize, the next step is multiple vehicles providing different perspectives or variations for more precise measurements. While flying a single satellite or UAV autonomously is a challenge, flying multiple vehicles in a precise formation is even more challenging. The goal of this project is to develop a scalable mesh network between vehicles (satellites or UAVs) to share real-time position data and maintain formations autonomously. Newly available low-cost, commercial off-the-shelf credit card size computers will be used as the basis for this network. Mesh networking techniques will be used to provide redundant links and a flexible network. The Small Projects Rapid Integration and Test Environment Lab will be used to simulate formation flying of satellites. UAVs built by the Aero-M team will be used to demonstrate the formation flying in the West Test Area. The ability to test in flight on NASA-owned UAVs allows this technology to achieve a high Technology Readiness Level (TRL) (TRL-4 for satellites and TRL-7 for UAVs). The low cost of small UAVs and the availability of a large test range (West Test Area) dramatically reduces the expense of testing. The end goal is for this technology to be ready to use on any multiple satellite or UAV mission.

  2. Prevalence and concentration of bacterial pathogens in raw produce and minimally processed packaged salads produced in and for the Netherlands.

    PubMed

    Wijnands, Lucas M; Delfgou-van Asch, Ellen H M; Beerepoot-Mensink, Marieke E; van der Meij-Florijn, Alice; Fitz-James, Ife; van Leusden, Frans M; Pielaat, Annemarie

    2014-03-01

    Recent outbreaks with vegetable or fruits as vehicles have raised interest in the characterization of the public health risk due to microbial contamination of these commodities. Because qualitative and quantitative data regarding prevalence and concentration of various microbes are lacking, we conducted a survey to estimate the prevalence and contamination level of raw produce and the resulting minimally processed packaged salads as sold in The Netherlands. A dedicated sampling plan accounted for the amount of processed produce in relation to the amount of products, laboratory capacity, and seasonal influences. Over 1,800 samples of produce and over 1,900 samples of ready-to-eat mixed salads were investigated for Salmonella enterica serovars, Campylobacter spp., Escherichia coli O157, and Listeria monocytogenes. The overall prevalence in raw produce varied between 0.11% for E. coli O157 and L. monocytogenes and 0.38% for Salmonella. Prevalence point estimates for specific produce/pathogen combinations ranged for Salmonella from 0.53% in iceberg lettuce to 5.1% in cucumber. For Campylobacter, this ranged from 0.83% in endive to 2.7% in oak tree lettuce. These data will be used to determine the public health risk posed by the consumption of ready-to-eat mixed salads in The Netherlands.

  3. Aft Skirt Electrical Umbilical (ASEU) and Vehicle Support Post (

    NASA Image and Video Library

    2016-12-09

    A construction worker is in view as a flatbed truck passes by carrying a vertical support post (VSP) for NASA's Space Launch System (SLS) rocket to the Mobile Launcher Yard at NASA's Kennedy Space Center in Florida. The two aft skirt electrical umbilicals (ASEUs) and the first of the vehicle support posts underwent a series of tests to confirm they are functioning properly and ready to support the SLS for launch. The ASEUs will connect to the SLS rocket at the bottom outer edge of each booster and provide electrical power and data connections to the rocket until it lifts off from the launch pad. The eight VSPs will support the load of the solid rocket boosters, with four posts for each of the boosters. The center’s Engineering Directorate and the Ground Systems Development and Operations Program are overseeing processing and testing of the umbilicals.

  4. Aft Skirt Electrical Umbilical (ASEU) and Vehicle Support Post (

    NASA Image and Video Library

    2016-12-09

    A flatbed truck carries a vertical support post (VSP) for NASA's Space Launch System (SLS) rocket to the Mobile Launcher Yard at NASA's Kennedy Space Center in Florida. In view is the mobile launcher. The two aft skirt electrical umbilicals (ASEUs) and the first of the vehicle support posts underwent a series of tests to confirm they are functioning properly and ready to support the SLS for launch. The ASEUs will connect to the SLS rocket at the bottom outer edge of each booster and provide electrical power and data connections to the rocket until it lifts off from the launch pad. The eight VSPs will support the load of the solid rocket boosters, with four posts for each of the boosters. The center’s Engineering Directorate and the Ground Systems Development and Operations Program are overseeing processing and testing of the umbilicals.

  5. Integrated System Test Approaches for the NASA Ares I Crew Launch Vehicle

    NASA Technical Reports Server (NTRS)

    Cockrell, Charles

    2008-01-01

    NASA is maturing test and evaluation plans leading to flight readiness of the Ares I crew launch vehicle. Key development, qualification, and verification tests are planned . Upper stage engine sea-level and altitude testing. First stage development and qualification motors. Upper stage structural and thermal development and qualification test articles. Main Propulsion Test Article (MPTA). Upper stage green run testing. Integrated Vehicle Ground Vibration Testing (IVGVT). Aerodynamic characterization testing. Test and evaluation supports initial validation flights (Ares I-Y and Orion 1) and design certification.

  6. Wireless Instrumentation Use on Launch Vehicles

    NASA Technical Reports Server (NTRS)

    Sherman, Aaron

    2010-01-01

    This slide presentation reviews the results of a study on the use of wireless instrumentation and sensors on future launch vehicles. The use of wireless technologies would if feasible would allow for fewer wires, and allow for more flexibility. However, it was generally concluded that wireless solutions are not currently ready to replace wired technologies for launch vehicles. The recommendations of the study were to continue to use wired sensors as the primary choice for vehicle instrumentation, and to continue to assess needs and use wireless instrumentation where appropriate. The future work includes support efforts for wireless technologies, and continue to monitor the development of wireless solutions.

  7. Social Information Processing Patterns, Social Skills, and School Readiness in Preschool Children

    PubMed Central

    Ziv, Yair

    2012-01-01

    The links between social information processing, social competence, and school readiness were examined in this short-term longitudinal study with a sample of 198 preschool children. Data on social information processing were obtained via child interview, data on child social competence were obtained via teacher report, and data on school readiness were obtained via child assessment (early literacy skills) and teacher report (approaches to learning). Findings provided support for our hypothesis that both social information processing and social competence are related to school readiness. Social competence also partially mediated the link between social information processing and school readiness thus supporting our hypothesis about an indirect path in which mental processes are translated into social skills and then translated into school readiness. PMID:23046690

  8. Systems Engineering Technology Readiness Assessment of Hybrid-Electric Technologies for Tactical Wheeled Vehicles

    DTIC Science & Technology

    2014-09-01

    reasonable yield within this decade. Similarly, the permanent magnet motors , which are desirable for traction due to their high efficiency, must also be...degrees C and 180 degrees C (RDECOM Public Affairs 2014). Current electric drive vehicles, using permanent magnet motors , have thermal limitations well...performance and their good efficiency, benefits particularly applicable to permanent magnet motors . Synchronous motors with permanent magnets, in

  9. UAV Swarm Attack: Protection System Alternatives for Destroyers

    DTIC Science & Technology

    2012-12-01

    Tactical Rocket-Propelled Grenade Airbag Protection System TRL - Technology Readiness Level UAV - Unmanned Aerial Vehicle USN - United States...com- posed of 62 DDGs is $2.014 billion dollars for the 12 year life cycle. J. REACTIVE ARMOR The Tactical Rocket-Propelled Grenade (RPG) Airbag ...Protection System (TRAPS) system involves ‘close-in’ protection using airbags located around a vehicle to minimize the damage from RPGs. This system was

  10. Before the Drop: Engineers Ready Supersonic Decelerator

    NASA Image and Video Library

    2014-05-21

    A saucer-shaped vehicle part of NASA Low-Density Supersonic Decelerator LDSD project designed to test interplanetary landing devices hangs on a tower in preparation for launch at the Pacific Missile Range Facility in Kauai, Hawaii.

  11. Mission Engineering of a Rapid Cycle Spacecraft Logistics Fleet

    NASA Technical Reports Server (NTRS)

    Holladay, Jon; McClendon, Randy (Technical Monitor)

    2002-01-01

    The requirement for logistics re-supply of the International Space Station has provided a unique opportunity for engineering the implementation of NASA's first dedicated pressurized logistics carrier fleet. The NASA fleet is comprised of three Multi-Purpose Logistics Modules (MPLM) provided to NASA by the Italian Space Agency in return for operations time aboard the International Space Station. Marshall Space Flight Center was responsible for oversight of the hardware development from preliminary design through acceptance of the third flight unit, and currently manages the flight hardware sustaining engineering and mission engineering activities. The actual MPLM Mission began prior to NASA acceptance of the first flight unit in 1999 and will continue until the de-commission of the International Space Station that is planned for 20xx. Mission engineering of the MPLM program requires a broad focus on three distinct yet inter-related operations processes: pre-flight, flight operations, and post-flight turn-around. Within each primary area exist several complex subsets of distinct and inter-related activities. Pre-flight processing includes the evaluation of carrier hardware readiness for space flight. This includes integration of payload into the carrier, integration of the carrier into the launch vehicle, and integration of the carrier onto the orbital platform. Flight operations include the actual carrier operations during flight and any required real-time ground support. Post-flight processing includes de-integration of the carrier hardware from the launch vehicle, de-integration of the payload, and preparation for returning the carrier to pre-flight staging. Typical space operations are engineered around the requirements and objectives of a dedicated mission on a dedicated operational platform (i.e. Launch or Orbiting Vehicle). The MPLM, however, has expanded this envelope by requiring operations with both vehicles during flight as well as pre-launch and post-landing operations. These unique requirements combined with a success-oriented schedule of four flights within a ten-month period have provided numerous opportunities for understanding and improving operations processes. Furthermore, it has increased the knowledge base of future Payload Carrier and Launch Vehicle hardware and requirement developments. Discussion of the process flows and target areas for process improvement are provided in the subject paper. Special emphasis is also placed on supplying guidelines for hardware development. The combination of process knowledge and hardware development knowledge will provide a comprehensive overview for future vehicle developments as related to integration and transportation of payloads.

  12. Oxygen Extraction from Regolith Using Ionic Liquids

    NASA Technical Reports Server (NTRS)

    Barrios, Elizabeth A.; Curreri, Peter A.; Karr, Laurel J.

    2011-01-01

    An important concern with long-duration manned space travel is the need to furnish enough materials to the vehicle, as well as the crew, for the duration of the mission. By extracting oxygen from the oxides present in regolith, propellant and life support could be supplied to the vehicle and the crew while in space, thereby limiting the amount of supplies needed prior to lift-off. Using a class of compounds known as ionic liquids, we have been able to lower the electrolysis operating temperature from 1600 C (molten oxide electrolysis) to less than 200 C, making this process much more feasible in terms of energy consumption and materials handling. To make this process ready for deployment into space, we have investigated what steps of the process would be affected by the low-gravity environment in space. In the lab, the solubilization of lunar regolith simulant in ionic liquid produces water vapor that is normally distilled out of solution and subsequently electrolyzed for oxygen production. This distillation is not possible in space, so we have tested a method known as pervaporation and have suggested a way this technique could be incorporated into a reactor design.

  13. Maturity Assessment of Space Plug-and-Play Architecture

    DTIC Science & Technology

    2013-03-01

    SSM SPA Service Module SRL System Readiness Level TAT Time-at-Tone TRA Technology Readiness Assessment TRL Technology Readiness Level USB Universal...maturity assessment—the Technology Readiness Level (TRL) process, the Integration Readiness Level (IRL) process, and the System Readiness Level ( SRL ...is an important hallmark of the SPA concept, and makes possible the composability and scalability of system designs that employ it. 14 4. SPA

  14. Final design and fabrication of an active control system for flutter suppression on a supercritical aeroelastic research wing

    NASA Technical Reports Server (NTRS)

    Hodges, G. E.; Mcgehee, C. R.

    1981-01-01

    The final design and hardware fabrication was completed for an active control system capable of the required flutter suppression, compatible with and ready for installation in the NASA aeroelastic research wing number 1 (ARW-1) on Firebee II drone flight test vehicle. The flutter suppression system uses vertical acceleration at win buttock line 1.930 (76), with fuselage vertical and roll accelerations subtracted out, to drive wing outboard aileron control surfaces through appropriate symmetric and antisymmetric shaping filters. The goal of providing an increase of 20 percent above the unaugmented vehicle flutter velocity but below the maximum operating condition at Mach 0.98 is exceeded by the final flutter suppression system. Results indicate that the flutter suppression system mechanical and electronic components are ready for installation on the DAST ARW-1 wing and BQM-34E/F drone fuselage.

  15. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elgowainy, Amgad; Han, Jeongwoo; Ward, Jacob

    This study provides a comprehensive lifecycle analysis (LCA), or cradle-to-grave (C2G) analysis, of the cost and greenhouse gas (GHG) emissions of a variety of vehicle-fuel pathways, as well as the levelized cost of driving (LCD) and cost of avoided GHG emissions. This study also estimates the technology readiness levels (TRLs) of key fuel and vehicle technologies along the pathways. The C2G analysis spans a full portfolio of midsize light-duty vehicles (LDVs), including conventional internal combustion engine vehicles (ICEVs), flexible fuel vehicles (FFVs), hybrid electric vehicles (HEVs), plug-in hybrid electric vehicles (PHEVs), battery electric vehicles (BEVs), and fuel cell electric vehiclesmore » (FCEVs). In evaluating the vehicle-fuel combinations, this study considers both low-volume and high-volume “CURRENT TECHNOLOGY” cases (nominally 2015) and a high-volume “FUTURE TECHNOLOGY” lower-carbon case (nominally 2025–2030). For the CURRENT TECHNOLOGY case, low-volume vehicle and fuel production pathways are examined to determine costs in the near term.« less

  16. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Elgowainy, Amgad; Han, Jeongwoo; Ward, Jacob

    This study provides a comprehensive life-cycle analysis (LCA), or cradle-to-grave (C2G) analysis, of the cost and greenhouse gas (GHG) emissions of a variety of vehicle-fuel pathways, as well as the levelized cost of driving (LCD) and cost of avoided GHG emissions. This study also estimates the technology readiness levels (TRLs) of key fuel and vehicle technologies along the pathways. The C2G analysis spans a full portfolio of midsize light-duty vehicles (LDVs), including conventional internal combustion engine vehicles (ICEVs), flexible fuel vehicles (FFVs), hybrid electric vehicles (HEVs), plug-in hybrid electric vehicles (PHEVs), battery electric vehicles (BEVs), and fuel cell electric vehiclesmore » (FCEVs). In evaluating the vehicle-fuel combinations, this study considers both low-volume and high-volume “CURRENT TECHNOLOGY” cases (nominally 2015) and a high-volume “FUTURE TECHNOLOGY” lower-carbon case (nominally 2025–2030). For the CURRENT TECHNOLOGY case, low-volume vehicle and fuel production pathways are examined to determine costs in the near term.« less

  17. KSC-2009-2893

    NASA Image and Video Library

    2009-04-29

    CAPE CANAVERAL, Fla. –– In High Bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, a second roll control system module is ready to be installed in an Ares I-X segment. Ares I-X is the test vehicle for the Ares I, which is part of the Constellation Program to return men to the moon and beyond. Ares I-X is targeted for launch in August 2009. Photo credit: NASA/Dimitri Gerondidakis

  18. KSC-2009-2739

    NASA Image and Video Library

    2009-04-17

    CAPE CANAVERAL, Fla. – In high bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, at right, technicians get ready to install the roll control system in the Ares I-X segment at left. Ares I-X is the test vehicle for the Ares I, which is part of the Constellation Program to return men to the moon and beyond. Ares I-X is targeted for launch in July 2009. Photo credit: NASA/Kim Shiflett

  19. Large engines and vehicles, 1958

    NASA Technical Reports Server (NTRS)

    1978-01-01

    During the mid-1950s, the Air Force sponsored work on the feasibility of building large, single-chamber engines, presumably for boost-glide aircraft or spacecraft. In 1956, the Army missile development group began studies of large launch vehicles. The possibilities opened up by Sputnik accelerated this work and gave the Army an opportunity to bid for the leading role in launch vehicles. The Air Force had the responsibility for the largest ballistic missiles and hence a ready-made base for extending their capability for spaceflight. During 1958, actions taken to establish a civilian space agency, and the launch vehicle needs seen by its planners, added a third contender to the space vehicle competition. These activities during 1958 are examined as to how they resulted in the initiation of a large rocket engine and the first large launch vehicle.

  20. KSC-08pd1964

    NASA Image and Video Library

    2008-07-14

    CAPE CANAVERAL, Fla. – In the tile shop at NASA's Kennedy Space Center, a Boeing Replacement Insulation 18, or BRI-18, tile is ready to be baked at 2,200 degrees Fahrenheit to cure the ceramic coating, part of the process to prepare the tiles for installation on space shuttles. BRI-18 is the strongest material used for thermal insulation on the orbiters and, when coated to produce toughened unipiece fibrous insulation, provides a tile with extremely high-impact resistance. It is replacing other tiles on areas of the vehicle where impact risk is high, such as the landing gear doors, the wing leading edge and the external tank doors. Photo credit: NASA/Jim Grossmann

  1. Recommendations of the National Mayday Readiness Initiative

    DOT National Transportation Integrated Search

    2000-10-23

    Automobile companies are rapidly deploying millions of vehicles with increasingly advanced : abilities to detect, collect and wirelessly transmit crisis-related voice and crash data at the push of a button or the deployment of an airbag. The next gen...

  2. 40 CFR Appendix III to Subpart S... - As-Received Inspection

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ...) General Compliance Provisions for Control of Air Pollution From New and In-Use Light-Duty Vehicles, Light... Reading 7. Build Date 8. MIL light on/off status 9. Readiness code status 10. Stored OBD codes 11.Any...

  3. The Status of Spacecraft Bus and Platform Technology Development under the NASA ISPT Program

    NASA Technical Reports Server (NTRS)

    Anderson, David J.; Munk, Michelle M.; Pencil, Eric; Dankanich, John; Glaab, Louis; Peterson, Todd

    2013-01-01

    The In-Space Propulsion Technology (ISPT) program is developing spacecraft bus and platform technologies that will enable or enhance NASA robotic science missions. The ISPT program is currently developing technology in four areas that include Propulsion System Technologies (electric and chemical), Entry Vehicle Technologies (aerocapture and Earth entry vehicles), Spacecraft Bus and Sample Return Propulsion Technologies (components and ascent vehicles), and Systems/Mission Analysis. Three technologies are ready for near-term flight infusion: 1) the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance; 2) NASA s Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system; and 3) Aerocapture technology development with investments in a family of thermal protection system (TPS) materials and structures; guidance, navigation, and control (GN&C) models of blunt-body rigid aeroshells; and aerothermal effect models. Two component technologies being developed with flight infusion in mind are the Advanced Xenon Flow Control System and ultralightweight propellant tank technologies. Future directions for ISPT are technologies that relate to sample return missions and other spacecraft bus technology needs like: 1) Mars Ascent Vehicles (MAV); 2) multi-mission technologies for Earth Entry Vehicles (MMEEV); and 3) electric propulsion. These technologies are more vehicles and mission-focused, and present a different set of technology development and infusion steps beyond those previously implemented. The Systems/Mission Analysis area is focused on developing tools and assessing the application of propulsion and spacecraft bus technologies to a wide variety of mission concepts. These inspace propulsion technologies are applicable, and potentially enabling for future NASA Discovery, New Frontiers, and sample return missions currently under consideration, as well as having broad applicability to potential Flagship missions. This paper provides a brief overview of the ISPT program, describing the development status and technology infusion readiness of in-space propulsion technologies in the areas of electric propulsion, Aerocapture, Earth entry vehicles, propulsion components, Mars ascent vehicle, and mission/systems analysis.

  4. The status of spacecraft bus and platform technology development under the NASA ISPT program

    NASA Astrophysics Data System (ADS)

    Anderson, D. J.; Munk, M. M.; Pencil, E.; Dankanich, J.; Glaab, L.; Peterson, T.

    The In-Space Propulsion Technology (ISPT) program is developing spacecraft bus and platform technologies that will enable or enhance NASA robotic science missions. The ISPT program is currently developing technology in four areas that include Propulsion System Technologies (electric and chemical), Entry Vehicle Technologies (aerocapture and Earth entry vehicles), Spacecraft Bus and Sample Return Propulsion Technologies (components and ascent vehicles), and Systems/Mission Analysis. Three technologies are ready for near-term flight infusion: 1) the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance; 2) NASA's Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system; and 3) Aerocapture technology development with investments in a family of thermal protection system (TPS) materials and structures; guidance, navigation, and control (GN& C) models of blunt-body rigid aeroshells; and aerothermal effect models. Two component technologies being developed with flight infusion in mind are the Advanced Xenon Flow Control System and ultra-lightweight propellant tank technologies. Future directions for ISPT are technologies that relate to sample return missions and other spacecraft bus technology needs like: 1) Mars Ascent Vehicles (MAV); 2) multi-mission technologies for Earth Entry Vehicles (MMEEV); and 3) electric propulsion. These technologies are more vehicles and mission-focused, and present a different set of technology development and infusion steps beyond those previously implemented. The Systems/Mission Analysis area is focused on developing tools and assessing the application of propulsion and spacecraft bus technologies to a wide variety of mission concepts. These in-space propulsion technologies are applicable, and potentially enabling for future NASA Discovery, New Frontiers, and sample return missions currently under consideration, as well as having broad applicabilit- to potential Flagship missions. This paper provides a brief overview of the ISPT program, describing the development status and technology infusion readiness of in-space propulsion technologies in the areas of electric propulsion, Aerocapture, Earth entry vehicles, propulsion components, Mars ascent vehicle, and mission/systems analysis.

  5. The Status of Spacecraft Bus and Platform Technology Development Under the NASA ISPT Program

    NASA Technical Reports Server (NTRS)

    Anderson, David J.; Munk, Michelle M.; Pencil, Eric J.; Dankanich, John; Glaab, Louis J.

    2013-01-01

    The In-Space Propulsion Technology (ISPT) program is developing spacecraft bus and platform technologies that will enable or enhance NASA robotic science missions. The ISPT program is currently developing technology in four areas that include Propulsion System Technologies (electric and chemical), Entry Vehicle Technologies (aerocapture and Earth entry vehicles), Spacecraft Bus and Sample Return Propulsion Technologies (components and ascent vehicles), and Systems/Mission Analysis. Three technologies are ready for near-term flight infusion: 1) the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance 2) NASAs Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system and 3) Aerocapture technology development with investments in a family of thermal protection system (TPS) materials and structures guidance, navigation, and control (GN&C) models of blunt-body rigid aeroshells and aerothermal effect models. Two component technologies being developed with flight infusion in mind are the Advanced Xenon Flow Control System, and ultra-lightweight propellant tank technologies. Future direction for ISPT are technologies that relate to sample return missions and other spacecraft bus technology needs like: 1) Mars Ascent Vehicles (MAV) 2) multi-mission technologies for Earth Entry Vehicles (MMEEV) and 3) electric propulsion. These technologies are more vehicle and mission-focused, and present a different set of technology development and infusion steps beyond those previously implemented. The Systems/Mission Analysis area is focused on developing tools and assessing the application of propulsion and spacecraft bus technologies to a wide variety of mission concepts. These in-space propulsion technologies are applicable, and potentially enabling for future NASA Discovery, New Frontiers, and sample return missions currently under consideration, as well as having broad applicability to potential Flagship missions. This paper provides a brief overview of the ISPT program, describing the development status and technology infusion readiness of in-space propulsion technologies in the areas of electric propulsion, Aerocapture, Earth entry vehicles, propulsion components, Mars ascent vehicle, and mission/systems analysis.

  6. KSC-2009-2897

    NASA Image and Video Library

    2009-04-29

    CAPE CANAVERAL, Fla. –– In High Bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, technicians are ready to maneuver a second roll control system module into place for installation in the Ares I-X segment. Ares I-X is the test vehicle for the Ares I, which is part of the Constellation Program to return men to the moon and beyond. Ares I-X is targeted for launch in August 2009. Photo credit: NASA/Dimitri Gerondidakis

  7. Optical Embedded Dust Sensor for Engine Protection and Early Warning on M1 Abrams/Ground Combat Vehicles

    DTIC Science & Technology

    2012-04-11

    warning of seal leakage or deterioration of air filters, thereby reducing engine damage and improving vehicle operational readiness. To be effective , the...for a comprehensive early warning and health management solution. To address the need for an effective dust detector for the AGT1500 engine and M1...an optical dust sensor for real-time continuous monitoring, and its effectiveness in quantitatively measuring dust penetration in the AGT1500 engine

  8. KSC-2009-2740

    NASA Image and Video Library

    2009-04-17

    CAPE CANAVERAL, Fla. – In high bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, at left center, technicians get ready to install the roll control system in the Ares I-X segment in the center. Ares I-X is the test vehicle for the Ares I, which is part of the Constellation Program to return men to the moon and beyond. Ares I-X is targeted for launch in July 2009. Photo credit: NASA/Kim Shiflett

  9. Measuring the Value of Renewal: Age, Operational Tempo, Deployment, and Reset Effects on the Readiness and Maintenance Costs of Army Vehicles

    DTIC Science & Technology

    2013-01-01

    policy and decisionmaking through research and analysis . This electronic document was made available from www.rand.org as a public service of the...through research and analysis . RAND’s publications do not necessarily reflect the opinions of its research clients and sponsors. R® is a registered...vehicle usage, location, and field maintenance records from the Army Materiel Systems Analysis Activity (AMSAA) Sample Data Collection (SDC) program

  10. Surveying Florida MPO readiness to incorporate innovative technologies into long range transportation plans : draft final report.

    DOT National Transportation Integrated Search

    2016-08-01

    There is optimism that Automated Vehicles (AVs) can improve the safety of the transportation system, : reduce congestion, increase reliability, offer improved mobility solutions to all segments of the population : including the transportation-disadva...

  11. Roentgen Satellite (ROSAT)

    NASA Technical Reports Server (NTRS)

    1986-01-01

    As result of the Challenger accident, the alternative possibility for launch of the ROSAT mission with an Atlas/Centaur launch vehicle is being considered. An overview of the problems involved in having the ROSAT flight ready for either a Shuttle or Atlas/Centaur launch is presented.

  12. Development of autonomous controller system of high speed UAV from simulation to ready to fly condition

    NASA Astrophysics Data System (ADS)

    Yudhi Irwanto, Herma

    2018-02-01

    The development of autonomous controller system that is specially used in our high speed UAV, it’s call RKX-200EDF/TJ controlled vehicle needs to be continued as a step to mastery and to developt control system of LAPAN’s satellite launching rocket. The weakness of the existing control system in this high speed UAV needs to be repaired and replaced using the autonomous controller system. Conversion steps for ready-to-fly system involved controlling X tail fin, adjusting auto take off procedure by adding X axis sensor, procedure of way points reading and process of measuring distance and heading to the nearest way point, developing user-friendly ground station, and adding tools for safety landing. The development of this autonomous controller system also covered a real flying test in Pandanwangi, Lumajang in November 2016. Unfortunately, the flying test was not successful because the booster rocket was blown right after burning. However, the system could record the event and demonstrated that the controller system had worked according to plan.

  13. Evaluating Community Readiness to Implement Environmental and Policy-Based Alcohol Abuse Prevention Strategies in Wisconsin

    PubMed Central

    Paltzer, Jason; Black, Penny; Moberg, D. Paul

    2013-01-01

    Background Matching evidence-based alcohol prevention strategies with a community’s readiness to support those strategies is the basis for the Tri-Ethnic Community Readiness Model (CRM). The purpose of this evaluation was to assess the association of a community’s readiness to address alcohol abuse in their community with the implementation of environmental and policy-based strategies. Methods Twenty-one substance abuse prevention coalitions in Wisconsin participated in a pre-post intervention group-only evaluation using the CRM. As part of a Substance Abuse and Mental Health Services Administration (SAMHSA) grant, all grantees were obligated by the Wisconsin Department of Health Services to implement environmental and policy-based strategies focused on one of three priority areas: young adult binge drinking, underage drinking, and alcohol-related motor-vehicle injuries and fatalities. Results At baseline, all communities (n=21) scored at or below a Stage 4 (on a scale of 1–9) readiness level (“preparedness”). The mean change in community readiness over the three-year period (2009–2011) was significant, but was less than one complete CRM stage (0.77, p=<0.001; 95% CI: 0.49, 1.05). Conclusion These findings suggest that implementation of environmental and policy-based strategies may improve a community’s progression in perceived readiness to address alcohol abuse regardless of the community’s baseline level of readiness to address alcohol abuse. Recommendation An assessment specific for measuring community readiness for policy-related strategies should be developed. The assessment would include community-level factors (e.g. community climate) for implementing policy-related prevention strategies, and not assume a linear readiness model. PMID:25346555

  14. Overview of NASA's Thermal Control System Development for Exploration Project

    NASA Technical Reports Server (NTRS)

    Stephan, Ryan A.

    2010-01-01

    NASA's Constellation Program includes the Orion, Altair, and Lunar Surface Systems project offices. The first two elements, Orion and Altair, are manned space vehicles while the third element is broader and includes several sub-elements including Rovers and a Lunar Habitat. The upcoming planned missions involving these systems and vehicles include several risks and design challenges. Due to the unique thermal environment, many of these risks and challenges are associated with the vehicles' thermal control system. NASA's Exploration Systems Mission Directorate (ESMD) includes the Exploration Technology Development Program (ETDP). ETDP consists of several technology development projects. The project chartered with mitigating the aforementioned risks and design challenges is the Thermal Control System Development for Exploration Project. The risks and design challenges are addressed through a rigorous technology development process that culminates with an integrated thermal control system test. The resulting hardware typically has a Technology Readiness Level (TRL) of six. This paper summarizes the development efforts being performed by the technology development project. The development efforts involve heat acquisition and heat rejection hardware including radiators, heat exchangers, and evaporators. The project has also been developing advanced phase change material heat sinks and performing assessments for thermal control system fluids.

  15. Smart sensor technology for advanced launch vehicles

    NASA Astrophysics Data System (ADS)

    Schoess, Jeff

    1989-07-01

    Next-generation advanced launch vehicles will require improved use of sensor data and the management of multisensor resources to achieve automated preflight checkout, prelaunch readiness assessment and vehicle inflight condition monitoring. Smart sensor technology is a key component in meeting these needs. This paper describes the development of a smart sensor-based condition monitoring system concept referred to as the Distributed Sensor Architecture. A significant event and anomaly detection scheme that provides real-time condition assessment and fault diagnosis of advanced launch system rocket engines is described. The design and flight test of a smart autonomous sensor for Space Shuttle structural integrity health monitoring is presented.

  16. Fiber optic gyroscopes for vehicle navigation systems

    NASA Astrophysics Data System (ADS)

    Kumagai, Tatsuya; Soekawa, Hirokazu; Yuhara, Toshiya; Kajioka, Hiroshi; Oho, Shigeru; Sonobe, Hisao

    1994-03-01

    Fiber optic gyroscopes (FOGs) have been developed for vehicle navigation systems and are used in Toyota Motor Corporation models Mark II, Chaser and Cresta in Japan. Use of FOGs in these systems requires high reliability under a wide range of conditions, especially in a temperature range between -40 and 85 degree(s)C. In addition, a high cost-performance ratio is needed. We have developed optical and electrical systems that are inexpensive and can perform well. They are ready to be mass-produced. FOGs have already been installed in luxury automobiles, and will soon be included in more basic vehicles. We have developed more inexpensive FOGs for this purpose.

  17. KSC-2009-5081

    NASA Image and Video Library

    2009-09-11

    CAPE CANAVERAL, Fla. – In NASA Kennedy Space Center's Vehicle Assembly Building High Bay 3, NASA's Ares I-X rocket is ready to undergo its first power-up. Part of the Constellation Program, the Ares I-X is the test vehicle for the Ares I, which is the essential core of a space transportation system that eventually will carry crewed missions back to the moon, on to Mars and out into the solar system. The Ares I-X flight test is targeted for Oct. 31. Photo credit: NASA/Cory Huston

  18. Balancing Materiel Readiness Risks and Concurrency in Weapon System Acquisition: A Handbook for Program Managers

    DTIC Science & Technology

    1984-07-15

    ftViCCii UWNC COMMAND MIX CM AFT DCP OUTUNC moo ffEOUCST FOR PROGRAM DECISION DRAFT DCP AFSC REVIEW RECOWMEM CATIONS OHI*OC Arse wioc...CS.P3 F16. El*. P» MCA Exhibit 4-6b. EMBEDDED COMPUTER HARDWARE vs. SOFTWARE Exhibit 4-6c. DoD EMBEDDED COMPUTER MARKET 31.J1...the mix of stores carried by that vehicle 6. Anticipated combat tactics employed by the carrying or launching vehicle and its maneuvering

  19. KSC technicians on team to modify X-34

    NASA Technical Reports Server (NTRS)

    1999-01-01

    The modified X-34, known as A-1A, rests in the background of the Dryden Flight Research Center at Edwards Air Force Base, Calif., while an integrated team of KSC, Dryden Flight Research Center and Orbital Sciences Corporation engineers and technicians bring the X-34 A-1A vehicle closer to test flight readiness. Since September, eight NASA engineering technicians from KSC's Engineering Prototype Lab have assisted in the complex process of converting the X-34 A-1 vehicle from captive carry status to unpowered flight status, the A-1A. The X-34 is 58.3 feet long, 27.7 feet wide from wing tip to wing tip, and 11.5 feet tall from the bottom of the fuselage to the top of the tail. The autonomously operated technology demonstrator will be air- launched from an L-1011 airplane and should be capable of flying eight times the speed of sound, reaching an altitude of 250,000 feet. The X-34 Project is managed by NASA's Marshall Space Flight Center in Huntsville, Ala.

  20. Space transfer vehicle concepts and requirements study. Volume 2, book 3: STV system interfaces

    NASA Technical Reports Server (NTRS)

    Weber, Gary A.

    1991-01-01

    This report presents the results of systems analyses and conceptual design of space transfer vehicles (STV). The missions examined included piloted and unpiloted lunar outpost support and spacecraft servicing, and unpiloted payload delivery to various earth and solar orbits. The study goal was to examine the mission requirements and provide a decision data base for future programmatic development plans. The final lunar transfer vehicles provided a wide range of capabilities and interface requirements while maintaining a constant payload mission model. Launch vehicle and space station sensitivity was examined, with the final vehicles as point design covering the range of possible options. Development programs were defined and technology readiness levels for different options were determined. Volume 1 presents the executive summary, volume 2 provides the study results, and volume 3 the cost and WBS data.

  1. Status of NASA In-Space Propulsion Technologies and Their Infusion Potential

    NASA Technical Reports Server (NTRS)

    Anderson, David; Pencil, Eric; Vento, Dan; Peterson, Todd; Dankanich, John; Hahne, David; Munk, Michelle

    2011-01-01

    Since 2001, the In-Space Propulsion Technology (ISPT) program has been developing in-space propulsion technologies that will enable or enhance NASA robotic science missions. These in-space propulsion technologies have broad applicability to future competed Discovery and New Frontiers mission solicitations, and are potentially enabling for future NASA flagship and sample return missions currently being considered. This paper provides status of the technology development of several in-space propulsion technologies that are ready for infusion into future missions. The technologies that are ready for flight infusion are: 1) the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance; 2) NASA s Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system; and 3) Aerocapture technology development with investments in a family of thermal protection system (TPS) materials and structures; guidance, navigation, and control (GN&C) models of blunt-body rigid aeroshells; and aerothermal effect models. Two component technologies that will be ready for flight infusion in FY12/13 are 1) Advanced Xenon Flow Control System, and 2) ultra-lightweight propellant tank technology advancements and their infusion potential will be also discussed. The paper will also describe the ISPT project s future focus on propulsion for sample return missions: 1) Mars Ascent Vehicles (MAV); 2) multi-mission technologies for Earth Entry Vehicles (MMEEV) needed for sample return missions from many different destinations; and 3) electric propulsion for sample return and low cost missions. These technologies are more vehicle-focused, and present a different set of technology infusion challenges. Systems/Mission Analysis focused on developing tools and assessing the application of propulsion technologies to a wide variety of mission concepts.

  2. CPAS Preflight Drop Test Analysis Process

    NASA Technical Reports Server (NTRS)

    Englert, Megan E.; Bledsoe, Kristin J.; Romero, Leah M.

    2015-01-01

    Throughout the Capsule Parachute Assembly System (CPAS) drop test program, the CPAS Analysis Team has developed a simulation and analysis process to support drop test planning and execution. This process includes multiple phases focused on developing test simulations and communicating results to all groups involved in the drop test. CPAS Engineering Development Unit (EDU) series drop test planning begins with the development of a basic operational concept for each test. Trajectory simulation tools include the Flight Analysis and Simulation Tool (FAST) for single bodies, and the Automatic Dynamic Analysis of Mechanical Systems (ADAMS) simulation for the mated vehicle. Results are communicated to the team at the Test Configuration Review (TCR) and Test Readiness Review (TRR), as well as at Analysis Integrated Product Team (IPT) meetings in earlier and intermediate phases of the pre-test planning. The ability to plan and communicate efficiently with rapidly changing objectives and tight schedule constraints is a necessity for safe and successful drop tests.

  3. The Use of Microcomputers to Improve Army Ground-Vehicle Readiness

    DTIC Science & Technology

    1980-03-01

    point indicated in Fig. 1. A demonstration of the leverage of the algorithmic parameter transformation can be inferred from data from automobile ...data) 45 data input channels: 1 accelerometer 22 digital data 22 analog data Backup battery Modular software architecture Field reprogrammable

  4. Integrated vehicle-based safety systems heavy-truck on-road test report

    DOT National Transportation Integrated Search

    2008-08-01

    This report presents results from a series of on-road verification tests performed to determine the readiness of a prototype : integrated warning system to advance to field testing, as well as to identify areas of system performance that should be im...

  5. Listeriosis Outbreaks and Associated Food Vehicles, United States, 1998–2008

    PubMed Central

    Cartwright, Emily J.; Jackson, Kelly A.; Johnson, Shacara D.; Graves, Lewis M.; Mahon, Barbara E.

    2013-01-01

    Listeria monocytogenes, a bacterial foodborne pathogen, can cause meningitis, bacteremia, and complications during pregnancy. This report summarizes listeriosis outbreaks reported to the Foodborne Disease Outbreak Surveillance System of the Centers for Disease Control and Prevention during 1998–2008. The study period includes the advent of PulseNet (a national molecular subtyping network for outbreak detection) in 1998 and the Listeria Initiative (enhanced surveillance for outbreak investigation) in 2004. Twenty-four confirmed listeriosis outbreaks were reported during 1998–2008, resulting in 359 illnesses, 215 hospitalizations, and 38 deaths. Outbreaks earlier in the study period were generally larger and longer. Serotype 4b caused the largest number of outbreaks and outbreak-associated cases. Ready-to-eat meats caused more early outbreaks, and novel vehicles (i.e., sprouts, taco/nacho salad) were associated with outbreaks later in the study period. These changes may reflect the effect of PulseNet and the Listeria Initiative and regulatory initiatives designed to prevent contamination in ready-to-eat meat and poultry products. PMID:23260661

  6. STS-92 Mission Specialist Wakata gets ready to drive the M-113

    NASA Technical Reports Server (NTRS)

    2000-01-01

    Getting ready to take his turn at the wheel of the M-113 is Mission Specialist Koichi Wakata of Japan. Behind him can be seen Mission Specialists Bill McArthur (left) and Leroy Chiao (right), who wait their turns. Learning to drive the armored vehicle is part of emergency egress training during Terminal Countdown Demonstration Test (TCDT) activities. The tracked vehicle could be used by the crew in the event of an emergency at the pad during which the crew must make a quick exit from the area. The TCDT also provides simulated countdown exercises and opportunities to inspect the mission payloads in the orbiter's payload bay. STS-92 is scheduled to launch Oct. 5 at 9:30 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program.

  7. Machine Learning Assessments of Soil Drying

    NASA Astrophysics Data System (ADS)

    Coopersmith, E. J.; Minsker, B. S.; Wenzel, C.; Gilmore, B. J.

    2011-12-01

    Agricultural activities require the use of heavy equipment and vehicles on unpaved farmlands. When soil conditions are wet, equipment can cause substantial damage, leaving deep ruts. In extreme cases, implements can sink and become mired, causing considerable delays and expense to extricate the equipment. Farm managers, who are often located remotely, cannot assess sites before allocating equipment, causing considerable difficulty in reliably assessing conditions of countless sites with any reliability and frequency. For example, farmers often trace serpentine paths of over one hundred miles each day to assess the overall status of various tracts of land spanning thirty, forty, or fifty miles in each direction. One means of assessing the moisture content of a field lies in the strategic positioning of remotely-monitored in situ sensors. Unfortunately, land owners are often reluctant to place sensors across their properties due to the significant monetary cost and complexity. This work aspires to overcome these limitations by modeling the process of wetting and drying statistically - remotely assessing field readiness using only information that is publically accessible. Such data includes Nexrad radar and state climate network sensors, as well as Twitter-based reports of field conditions for validation. Three algorithms, classification trees, k-nearest-neighbors, and boosted perceptrons are deployed to deliver statistical field readiness assessments of an agricultural site located in Urbana, IL. Two of the three algorithms performed with 92-94% accuracy, with the majority of misclassifications falling within the calculated margins of error. This demonstrates the feasibility of using a machine learning framework with only public data, knowledge of system memory from previous conditions, and statistical tools to assess "readiness" without the need for real-time, on-site physical observation. Future efforts will produce a workflow assimilating Nexrad, climate network, and Twitter data to generate a real-time web-map of estimated readiness conditions.

  8. KSC-00pp1823

    NASA Image and Video Library

    2000-12-04

    Inside Orbiter Processing Facility bay 3, Atlantis is ready for rollover to the Vehicle Assembly Building. In the VAB it will be raised to vertical and lifted up and into high bay 3 for stacking with its external tank and solid rocket boosters. Atlantis will fly on mission STS-98, the seventh construction flight to the International Space Station. The orbiter will carry in its payload bay the U.S. Laboratory, named Destiny, that will have five system racks already installed inside of the module. After delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. Atlantis is scheduled for launch on Jan. 18, 2001, at 2:44 a.m. EST, with a crew of five

  9. KSC00pp1823

    NASA Image and Video Library

    2000-12-04

    Inside Orbiter Processing Facility bay 3, Atlantis is ready for rollover to the Vehicle Assembly Building. In the VAB it will be raised to vertical and lifted up and into high bay 3 for stacking with its external tank and solid rocket boosters. Atlantis will fly on mission STS-98, the seventh construction flight to the International Space Station. The orbiter will carry in its payload bay the U.S. Laboratory, named Destiny, that will have five system racks already installed inside of the module. After delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. Atlantis is scheduled for launch on Jan. 18, 2001, at 2:44 a.m. EST, with a crew of five

  10. SIMBIOS Project

    NASA Technical Reports Server (NTRS)

    Fargion, Giulietta S.; McClain, Charles R.; Busalacchi, Antonio J. (Technical Monitor)

    2001-01-01

    The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRAI) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.

  11. SpaceX Falcon Heavy Demo Flight - Ready for Launch

    NASA Image and Video Library

    2018-02-06

    A SpaceX Falcon Heavy stands at Launch Complex 39A, far right, at NASA's Kennedy Space Center in Florida awaiting liftoff on its demonstration flight. In the foreground is the center’s iconic Vehicle Assembly Building. The demonstration flight is a significant milestone for the world's premier multi-user spaceport. In 2014, NASA signed a property agreement with SpaceX for the use and operation of the center's pad 39A, where the company has launched Falcon 9 rockets and is preparing for the first Falcon Heavy. NASA also has Space Act Agreements in place with partners, such as SpaceX, to provide services needed to process and launch rockets and spacecraft.

  12. Interim Cryogenic Propulsion Stage (ICPS) Prep for Transport fro

    NASA Image and Video Library

    2017-07-25

    The Interim Cryogenic Propulsion Stage (ICPS) for NASA's Space Launch System (SLS) rocket is packed inside a canister and ready to be moved from the United Launch Alliance (ULA) Delta Operations Center near Space Launch Complex 37 at Cape Canaveral Air Force Station to the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The ICPS is the first integrated piece of flight hardware to arrive for the SLS. It is the in-space stage that is located toward the top of the rocket, between the Launch Vehicle Stage Adapter and the Orion Spacecraft Adapter. It will provide some of the in-space propulsion during Orion's first flight test atop the SLS on Exploration Mission-1.

  13. Retail ready-to-eat food as a potential vehicle for Staphylococcus spp. harboring antibiotic resistance genes.

    PubMed

    Chajęcka-Wierzchowska, Wioleta; Zadernowska, Anna; Nalepa, Beata; Sierpińska, Magda; Laniewska-Trokenheim, Lucja

    2014-06-01

    Ready-to-eat (RTE) food, which does not need thermal processing before consumption, could be a vehicle for the spread of antibiotic-resistant microorganisms. As part of general microbiological safety checks, staphylococci are routinely enumerated in these kinds of foods. However, the presence of antibiotic-resistant staphylococci in RTE food is not routinely investigated, and data are only available from a small number of studies. The present study evaluated the pheno- and genotypical antimicrobial resistance profile of Staphylococcus spp. isolated from 858 RTE foods (cheeses, cured meats, sausages, smoked fishes, salads). Of 113 strains isolated, S. aureus was the most prevalent species, followed by S. xylosus, S. saprophyticus, and S. epidermidis. More than half (54.9%) of the isolates were resistant to at least one class of tested antibiotic; of these, 35.4% of the strains were classified as multidrug resistant. Most of the isolates were resistant to cefoxitin (49.6%), followed by clindamycin (39.3%), tigecycline (27.4%), quinupristin-dalfopristin (22.2%), rifampin (20.5%), tetracycline (17.9%), and erythromycin (8.5%). All methicillin-resistant staphylococci harbored the mecA gene. Among the isolates resistant to at least one antibiotic, 38 harbored tetracycline resistance determinant tet (M), 24 harbored tet (L), and 9 harbored tet (K). Of the isolates positive for tet (M) genes, 34.2% were positive for the Tn916-Tn1545-like integrase family gene. Our results indicated that retail RTE food could be considered an important route for the transmission of antibiotic-resistant bacteria harboring multiple antibiotic resistance genes.

  14. KSC-2009-2209

    NASA Image and Video Library

    2009-03-19

    CAPE CANAVERAL, Fla. – – The NASA Railroad (right) is ready for the exchange of the Florida East Coast Railway cars carrying the booster segments for the Ares I-X test rocket. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida. The segments will be delivered to the Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Kim Shiflett

  15. KSC-2009-2208

    NASA Image and Video Library

    2009-03-19

    CAPE CANAVERAL, Fla. – The NASA Railroad (right) is ready for the exchange of the Florida East Coast Railway cars carrying the booster segments for the Ares I-X test rocket. The four reusable motor segments and the nozzle exit cone, manufactured by the Ares I first-stage prime contractor Alliant Techsystems Inc., or ATK, departed Utah March 12 on the seven-day, cross-country trip to Florida. The segments will be delivered to the Rotation, Processing and Surge Facility for final processing and integration. The booster used for the Ares I-X launch is being modified by adding new forward structures and a fifth segment simulator. The motor is the final hardware needed for the rocket's upcoming test flight this summer. The stacking operations are scheduled to begin in the Vehicle Assembly Building in April. Photo credit: NASA/Kim Shiflett

  16. National Military Strategy: Army Reserve Readiness

    DTIC Science & Technology

    2013-03-01

    that resulted in a national unemployment rate of 4.5 % (until this period economic unemployment was generally calculated at 7.0 %).14F15 Though this...vehicles they have in stock today, but also start talking to General Motors about getting some other franchises and allocations for sportier model

  17. ENVIRONMENTAL TECHNOLOGY VERIFICATION: A VEHICLE FOR INDEPENDENT, CREDIBLE PERFORMANCE RESULTS ON COMMERCIALLY READY TECHNOLOGIES

    EPA Science Inventory

    The paper discusses the U. S. Environmental Protection Agency's Environmental Technology Verification (ETV) Program: its history, operations, past successes, and future plans. Begun in 1995 in response to President Clinton's "Bridge to a Sustainable Future" as a means to work wit...

  18. Medium Duty Electric Vehicle Demonstration Project

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mackie, Robin J. D.

    2015-05-31

    The Smith Electric Vehicle Demonstration Project (SDP) was integral to the Smith business plan to establish a manufacturing base in the United States (US) and produce a portfolio of All Electric Vehicles (AEV’s) for the medium duty commercial truck market. Smith focused on the commercial depot based logistics market, as it represented the market that was most ready for the early adoption of AEV technology. The SDP enabled Smith to accelerate its introduction of vehicles and increase the size of its US supply chain to support early market adoption of AEV’s that were cost competitive, fully met the needs ofmore » a diverse set of end users and were compliant with Federal safety and emissions requirements. The SDP accelerated the development and production of various electric drive vehicle systems to substantially reduce petroleum consumption, reduce vehicular emissions of greenhouse gases (GHG), and increase US jobs.« less

  19. KSC-02pd1089

    NASA Image and Video Library

    2002-06-27

    KENNEDY SPACE CENTER, FLA. - After opening remarks at a commissioning ceremony for the new Convoy Command Vehicle, Center Director Roy Bridges Jr. (right) gets ready to open the door for a tour of the vehicle. At left is United Space Alliance Chief Operating Officer Mike McCulley. The new 40-foot vehicle is replacing a 15-year old model, and will be used following Shuttle landings as the prime vehicle to control critical communications between the orbiter, the crew and the Launch Control Center, to monitor the health of the Shuttle Orbiter systems and to direct convoy operations at the Shuttle Landing Facility. Upgrades and high-tech features incorporated into the design and development of this vehicle make it more reliable and efficient for the convoy crew. Seating capacity was increased from 4 to 12, and video recorders and television monitors were added to provide the convoy team with the maximum amount of visual information

  20. Evaluation of Pentravan®, Pentravan® Plus, Phytobase®, Lipovan® and Pluronic Lecithin Organogel for the transdermal administration of antiemetic drugs to treat chemotherapy-induced nausea and vomiting at the hospital.

    PubMed

    Bourdon, F; Lecoeur, M; Leconte, L; Ultré, V; Kouach, M; Odou, P; Vaccher, C; Foulon, C

    2016-12-30

    The objective of this study was to evaluate five commercial ready-to-use transdermal vehicles (Phytobase ® , Lipovan ® , Pentravan ® , Pentravan ® Plus and Pluronic Lecithin Organogel (PLO)), for the compounding of three antiemetic drugs (ondansetron, dexamethasone and aprepitant) and their administration in combination to treat chemotherapy-induced nausea and vomiting (CINV) at the hospital. Drugs were individually formulated in these vehicles and in mixture in Pentravan ® Plus using different penetration enhancers. Quality control of the forms has demonstrated that formulation process was mastered and convenient for the hospital (time required: 20min). Diffusion experiments through synthetic membranes and pig ear epidermis performed using Franz-type diffusion cells, have shown that the release and permeation process were greater for ondansetron than for dexamethasone and aprepitant, with a release step not limiting. As permeation of aprepitant was too low, it was discarded of the study. When ondansetron and dexamethasone were compounded in combination in Pentravan ® Plus, the most efficient vehicle, a permeation decrease was observed. Finally, the use of tween 20 instead of EtOH as chemical enhancer has led to 2-fold factor increase in the flux of dexamethasone, resulting in fluxes convenient for transdermal administration of ondansetron to a child, but insufficient for an adult and for dexamethasone. Copyright © 2016 Elsevier B.V. All rights reserved.

  1. Foods for a Mission to Mars: Equivalent System Mass and Development of a Multipurpose Small-Scale Seed Processor

    NASA Technical Reports Server (NTRS)

    Gandolph, J.; Chen, G.; Weiss, I.; Perchonok, D. M.; Wijeratne, W.; Fortune, S.; Corvalan, C.; Campanella, O.; Okos, M.; Mauer, L. J.

    2007-01-01

    The candidate crops for planetary food systems include: wheat, white and sweet potatoes, soybean, peanut, strawberry, dry bean including le ntil and pinto, radish, rice, lettuce, carrot, green onion, tomato, p eppers, spinach, and cabbage. Crops such as wheat, potatoes, soybean, peanut, dry bean, and rice can only be utilized after processing, while others are classified as ready-to-eat. To process foods in space, the food processing subsystem must be capable of producing a variety of nutritious, acceptable, and safe edible ingredients and food produ cts from pre-packaged and resupply foods as well as salad crops grown on the transit vehicle or other crops grown on planetary surfaces. D esigning, building, developing, and maintaining such a subsystem is b ound to many constraints and restrictions. The limited power supply, storage locations, variety of crops, crew time, need to minimize waste , and other equivalent system mass (ESM) parameters must be considere d in the selection of processing equipment and techniques.

  2. 33 CFR 154.735 - Safety requirements.

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... protective equipment is ready to operate. (g) Signs indicating that smoking is prohibited are posted in areas where smoking is not permitted. (h) Trucks and other motor vehicles are operated or parked only in... no other duties except to watch for the presence of fire and to prevent the development of hazardous...

  3. Spacecraft Bus and Platform Technology Development under the NASA ISPT Program

    NASA Technical Reports Server (NTRS)

    Anderson, David J.; Munk, Michelle M.; Pencil, Eric; Dankanich, John; Glaab, Louis; Peterson, Todd

    2013-01-01

    The In-Space Propulsion Technology (ISPT) program is developing spacecraft bus and platform technologies that will enable or enhance NASA robotic science missions. The ISPT program is currently developing technology in four areas that include Propulsion System Technologies (electric and chemical), Entry Vehicle Technologies (aerocapture and Earth entry vehicles), Spacecraft Bus and Sample Return Propulsion Technologies (components and ascent vehicles), and Systems/Mission Analysis. Three technologies are ready for near-term flight infusion: 1) the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance; 2) NASA s Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system; and 3) Aerocapture technology development with investments in a family of thermal protection system (TPS) materials and structures; guidance, navigation, and control (GN&C) models of blunt-body rigid aeroshells; and aerothermal effect models. Two component technologies being developed with flight infusion in mind are the Advanced Xenon Flow Control System, and ultra-lightweight propellant tank technologies. Future direction for ISPT are technologies that relate to sample return missions and other spacecraft bus technology needs like: 1) Mars Ascent Vehicles (MAV); 2) multi-mission technologies for Earth Entry Vehicles (MMEEV) for sample return missions; and 3) electric propulsion for sample return and low cost missions. These technologies are more vehicle and mission-focused, and present a different set of technology development and infusion steps beyond those previously implemented. The Systems/Mission Analysis area is focused on developing tools and assessing the application of propulsion and spacecraft bus technologies to a wide variety of mission concepts. These in-space propulsion technologies are applicable, and potentially enabling for future NASA Discovery, New Frontiers, and sample return missions currently under consideration, as well as having broad applicability to potential Flagship missions. This paper provides a brief overview of the ISPT program, describing the development status and technology infusion readiness of in-space propulsion technologies in the areas of electric propulsion, Aerocapture, Earth entry vehicles, propulsion components, Mars ascent vehicle, and mission/systems analysis.

  4. Spacecraft Bus and Platform Technology Development under the NASA ISPT Program

    NASA Technical Reports Server (NTRS)

    Anderson, David J.; Munk, Michelle M.; Pencil, Eric J.; Dankanich, John W.; Glaab, Louis J.; Peterson, Todd T.

    2013-01-01

    The In-Space Propulsion Technology (ISPT) program is developing spacecraft bus and platform technologies that will enable or enhance NASA robotic science missions. The ISPT program is currently developing technology in four areas that include Propulsion System Technologies (electric and chemical), Entry Vehicle Technologies (aerocapture and Earth entry vehicles), Spacecraft Bus and Sample Return Propulsion Technologies (components and ascent vehicles), and Systems/Mission Analysis. Three technologies are ready for near-term flight infusion: 1) the high-temperature Advanced Material Bipropellant Rocket (AMBR) engine providing higher performance 2) NASAs Evolutionary Xenon Thruster (NEXT) ion propulsion system, a 0.6-7 kW throttle-able gridded ion system and 3) Aerocapture technology development with investments in a family of thermal protection system (TPS) materials and structures guidance, navigation, and control (GN&C) models of blunt-body rigid aeroshells and aerothermal effect models. Two component technologies being developed with flight infusion in mind are the Advanced Xenon Flow Control System, and ultra-lightweight propellant tank technologies. Future direction for ISPT are technologies that relate to sample return missions and other spacecraft bus technology needs like: 1) Mars Ascent Vehicles (MAV) 2) multi-mission technologies for Earth Entry Vehicles (MMEEV) for sample return missions and 3) electric propulsion for sample return and low cost missions. These technologies are more vehicle and mission-focused, and present a different set of technology development and infusion steps beyond those previously implemented. The Systems/Mission Analysis area is focused on developing tools and assessing the application of propulsion and spacecraft bus technologies to a wide variety of mission concepts. These in-space propulsion technologies are applicable, and potentially enabling for future NASA Discovery, New Frontiers, and sample return missions currently under consideration, as well as having broad applicability to potential Flagship missions. This paper provides a brief overview of the ISPT program, describing the development status and technology infusion readiness of in-space propulsion technologies in the areas of electric propulsion, Aerocapture, Earth entry vehicles, propulsion components, Mars ascent vehicle, and mission/systems analysis.

  5. Airframe Technology Development for Next Generation Launch Vehicles

    NASA Technical Reports Server (NTRS)

    Glass, David E.

    2004-01-01

    The Airframe subproject within NASA's Next Generation Launch Technology (NGLT) program has the responsibility to develop airframe technology for both rocket and airbreathing vehicles for access to space. The Airframe sub-project pushes the state-of-the-art in airframe technology for low-cost, reliable, and safe space transportation. Both low and medium technology readiness level (TRL) activities are being pursued. The key technical areas being addressed include design and integration, hot and integrated structures, cryogenic tanks, and thermal protection systems. Each of the technologies in these areas are discussed in this paper.

  6. Comparison of Rheological and Sedimentation Behavior of Commercially Available Suspending Vehicles for Oral Pharmaceutical Preparations.

    PubMed

    Visser, J Carolina; Ten Seldam, Inge E J; van der Linden, Isabella J; Hinrichs, Wouter L J; Veenendaal, Reinier F H; Dijkers, Eli C F; Woerdenbag, Herman J

    2018-01-01

    A pharmaceutical suspension is a semi-liquid dosage form suitable for patients being unable to swallow solid medicines such as tablets and capsules. A vehicle used for the preparation of pharmaceutical oral suspensions preferably shows pseudo-plastic behavior. In a product that gets thinner with agitation and thicker upon standing, slow settlement of the suspended active pharmaceutical ingredient is combined with good pourability and rehomogenization. This gives the best guarantee of uniformity of dose for oral suspensions. In this study, the rheological behavior of commercially available ready-to-use vehicles for oral pharmaceutical preparations was compared, and the sedimentation of paracetamol dispersed in these vehicles was investigated. With SuspendIt and SyrSpend SF PH4 (Liquid), both pseudoplastic vehicles, very stable paracetamol suspensions were obtained. Of these two vehicles, SyrSpend SF PH4 (Liquid) displayed somewhat higher viscosity, which is a favorable quality characteristic for suspensions. Copyright© by International Journal of Pharmaceutical Compounding, Inc.

  7. KSC-07pd1177

    NASA Image and Video Library

    2007-05-15

    KENNEDY SPACE CENTER, FLA. -- In high bay No. 1 of the Vehicle Assembly Building, Space Shuttle Atlantis is ready for its return to Launch Pad 39A. In late February, Atlantis' external tank received hail damage during a severe thunderstorm that passed through the Kennedy Space Center Launch Complex 39 area. The hail caused visible divots in the giant tank's foam insulation, as well as minor surface damage to about 26 heat shield tiles on the shuttle's left wing. The launch of Space Shuttle Atlantis on mission STS-117 is now targeted for June 8. A flight readiness review will be held on May 30 and 31. Photo credit: NASA/Troy Cryder

  8. Decision Grade: Readiness, Mission Impacts, and Classified Data in the Defense Budgeting Process

    DTIC Science & Technology

    2015-10-23

    AU/ACSC/2015 DECISION-GRADE: READINESS, MISSION IMPACTS , AND CLASSIFIED DATA IN THE DEFENSE BUDGETING PROCESS by Ryan M. Harrell, Maj, USAF A... impacts . This research provides suggestions to improve the venerable PPBE system by investigating ‘how does’ and ‘how should’ the DOD use planning guidance...readiness reporting, this effort analyzes the impact of overclassification and redefines readiness to provide decision-grade analysis to Congress. 1

  9. KSC00pp1824

    NASA Image and Video Library

    2000-12-04

    Viewed from inside Orbiter Processing Facility bay 3, Atlantis is ready for rollover to the Vehicle Assembly Building. In the VAB it will be raised to vertical and lifted up and into high bay 3 for stacking with its external tank and solid rocket boosters. Atlantis will fly on mission STS-98, the seventh construction flight to the International Space Station. The orbiter will carry in its payload bay the U.S. Laboratory, named Destiny, that will have five system racks already installed inside of the module. After delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. Atlantis is scheduled for launch on Jan. 18, 2001, at 2:44 a.m. EST, with a crew of five

  10. KSC-00pp1824

    NASA Image and Video Library

    2000-12-04

    Viewed from inside Orbiter Processing Facility bay 3, Atlantis is ready for rollover to the Vehicle Assembly Building. In the VAB it will be raised to vertical and lifted up and into high bay 3 for stacking with its external tank and solid rocket boosters. Atlantis will fly on mission STS-98, the seventh construction flight to the International Space Station. The orbiter will carry in its payload bay the U.S. Laboratory, named Destiny, that will have five system racks already installed inside of the module. After delivery of electronics in the lab, electrically powered attitude control for Control Moment Gyroscopes will be activated. Atlantis is scheduled for launch on Jan. 18, 2001, at 2:44 a.m. EST, with a crew of five

  11. SIMBIOS Project 1999 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta S.

    1999-01-01

    The purpose of this technical memorandum is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.

  12. KSC-08pd1965

    NASA Image and Video Library

    2008-07-14

    CAPE CANAVERAL, Fla. – In the tile shop at NASA's Kennedy Space Center, a worker is ready to place a Boeing Replacement Insulation 18, or BRI-18, tile in the oven. The tile will be baked at 2,200 degrees Fahrenheit to cure the ceramic coating, part of the process to prepare the tiles for installation on space shuttles. BRI-18 is the strongest material used for thermal insulation on the orbiters and, when coated to produce toughened unipiece fibrous insulation, provides a tile with extremely high-impact resistance. It is replacing other tiles on areas of the vehicle where impact risk is high, such as the landing gear doors, the wing leading edge and the external tank doors. Photo credit: NASA/Jim Grossmann

  13. KSC-99pp1133

    NASA Image and Video Library

    1999-09-20

    The Butler Building at Kennedy Space Center is nearly demolished, with the help of the crane in the background. The building, which is near the Orbiter Processing Facility (right), is being demolished in order to extend the crawlerway leading to the high bay of the Vehicle Assembly Building (VAB), part of KSC's Safe Haven project. The goal of Safe Haven is to strengthen readiness for Florida's hurricane season by expanding the VAB's storage capacity. Construction includes outfitting the VAB with a third stacking area, in high bay 2, that will allow NASA to preassemble stacks and still have room in the VAB to pull a Shuttle back from the pad into the safety of the VAB if severe weather threatens. The VAB can withstand winds up to 125 mph

  14. KSC-99pp1132

    NASA Image and Video Library

    1999-09-20

    The walls of the Butler Building at Kennedy Space Center come tumbling down, with the help of the crane in the background. The building, which is near the Orbiter Processing Facility, is being demolished in order to extend the crawlerway leading to the high bay of the Vehicle Assembly Building (VAB), part of KSC's Safe Haven project. The goal of Safe Haven is to strengthen readiness for Florida's hurricane season by expanding the VAB's storage capacity. Construction includes outfitting the VAB with a third stacking area, in high bay 2, that will allow NASA to preassemble stacks and still have room in the VAB to pull a Shuttle back from the pad into the safety of the VAB if severe weather threatens. The VAB can withstand winds up to 125 mph

  15. SIMBIOS Project 1998 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta, S.

    1999-01-01

    The purpose of this series of technical reports is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Ocean Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant to substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issues by an operational project.

  16. Interim Cryogenic Propulsion Stage (ICPS) Transport from DOC to

    NASA Image and Video Library

    2017-07-26

    The Interim Cryogenic Propulsion Stage (ICPS) for NASA's Space Launch System (SLS) rocket is packed inside a canister and ready to exit the United Launch Alliance (ULA) Delta Operations Center near Space Launch Complex 37 at Cape Canaveral Air Force Station for its move to the Space Station Processing Facility at NASA's Kennedy Space Center in Florida. The ICPS is the first integrated piece of flight hardware to arrive for the SLS. It is the in-space stage that is located toward the top of the rocket, between the Launch Vehicle Stage Adapter and the Orion Spacecraft Adapter. It will provide some of the in-space propulsion during Orion's first flight test atop the SLS on Exploration Mission-1.

  17. Advanced Structural Optimization Under Consideration of Cost Tracking

    NASA Astrophysics Data System (ADS)

    Zell, D.; Link, T.; Bickelmaier, S.; Albinger, J.; Weikert, S.; Cremaschi, F.; Wiegand, A.

    2014-06-01

    In order to improve the design process of launcher configurations in the early development phase, the software Multidisciplinary Optimization (MDO) was developed. The tool combines different efficient software tools such as Optimal Design Investigations (ODIN) for structural optimizations, Aerospace Trajectory Optimization Software (ASTOS) for trajectory and vehicle design optimization for a defined payload and mission.The present paper focuses to the integration and validation of ODIN. ODIN enables the user to optimize typical axis-symmetric structures by means of sizing the stiffening designs concerning strength and stability while minimizing the structural mass. In addition a fully automatic finite element model (FEM) generator module creates ready-to-run FEM models of a complete stage or launcher assembly.Cost tracking respectively future improvements concerning cost optimization are indicated.

  18. System design of ELITE power processing unit

    NASA Astrophysics Data System (ADS)

    Caldwell, David J.

    The Electric Propulsion Insertion Transfer Experiment (ELITE) is a space mission planned for the mid 1990s in which technological readiness will be demonstrated for electric orbit transfer vehicles (EOTVs). A system-level design of the power processing unit (PPU), which conditions solar array power for the arcjet thruster, was performed to optimize performance with respect to reliability, power output, efficiency, specific mass, and radiation hardness. The PPU system consists of multiphased parallel switchmode converters, configured as current sources, connected directly from the array to the thruster. The PPU control system includes a solar array peak power tracker (PPT) to maximize the power delivered to the thruster regardless of variations in array characteristics. A stability analysis has been performed to verify that the system is stable despite the nonlinear negative impedance of the PPU input and the arcjet thruster. Performance specifications are given to provide the required spacecraft capability with existing technology.

  19. Equitable Education for All: Using a Comprehensive Instructional Model to Improve Preschool Teacher Practices

    ERIC Educational Resources Information Center

    Carlson, Abby G.; Curby, Timothy W.; Brown, Chavaughn A.; Trygstad, Kelly M.; Truong, Felicia R.

    2017-01-01

    The current study evaluates the effectiveness of a comprehensive instructional model, ("Every Child Ready"), as a vehicle to provide equitable education experiences for all children by compensating for gaps in teacher knowledge. The ECR instructional model addresses several challenges facing the early childhood landscape. Specifically,…

  20. Saturn Apollo Program

    NASA Image and Video Library

    1969-01-01

    A close-up view of the Apollo 11 command service module ready to be mated with the spacecraft LEM adapter of the third stage. The towering 363-foot Saturn V was a multi-stage, multi-engine launch vehicle standing taller than the Statue of Liberty. Altogether, the Saturn V engines produced as much power as 85 Hoover Dams.

  1. Alternative Fuels Data Center: Plug-In Electric Vehicle Deployment Policy

    Science.gov Websites

    addendum to a pre-existing zoning ordinance to specify permissible use of EVSE in single- and multi-family -ready requirements may include EVSE installation, pre-wiring, or space reservation. California building charging infrastructure. Examples include the scope of EVSE pre-wiring or installation from a

  2. Apollo 11 Command Service Module

    NASA Technical Reports Server (NTRS)

    1969-01-01

    A close-up view of the Apollo 11 command service module ready to be mated with the spacecraft LEM adapter of the third stage. The towering 363-foot Saturn V was a multi-stage, multi-engine launch vehicle standing taller than the Statue of Liberty. Altogether, the Saturn V engines produced as much power as 85 Hoover Dams.

  3. Ready or Not...? Teen Sexuality and the Troubling Discourse of Readiness

    ERIC Educational Resources Information Center

    Ashcraft, Catherine

    2006-01-01

    In this article, I explore how talk about being "ready" or "not ready" for sex shapes teen and adult understandings of sexuality. I argue that this "discourse of readiness" poses serious threats to teens' identity development, sexual decision making, and educators efforts to help them through these processes. To illustrate, I draw from my…

  4. M-Readiness Assessment Model Development and Validation: Investigation of Readiness Index and Factors Affecting Readiness

    ERIC Educational Resources Information Center

    Bakhsh, Muhammad; Mahmood, Amjad; Sangi, Nazir Ahmed

    2018-01-01

    It is important for distance learning institutions to be well prepared before designing and implementing any new technology based learning system to justify the investment and minimize failure risk. It can be achieved by systematically assessing the readiness of all stakeholders. This paper first proposes an m-readiness assessment process and…

  5. Concept Design of High Power Solar Electric Propulsion Vehicles for Human Exploration

    NASA Technical Reports Server (NTRS)

    Hoffman, David J.; Kerslake, Thomas W.; Hojnicki, Jeffrey S.; Manzella, David H.; Falck, Robert D.; Cikanek, Harry A., III; Klem, Mark D.; Free, James M.

    2011-01-01

    Human exploration beyond low Earth orbit will require enabling capabilities that are efficient, affordable and reliable. Solar electric propulsion (SEP) has been proposed by NASA s Human Exploration Framework Team as one option to achieve human exploration missions beyond Earth orbit because of its favorable mass efficiency compared to traditional chemical propulsion systems. This paper describes the unique challenges associated with developing a large-scale high-power (300-kWe class) SEP vehicle and design concepts that have potential to meet those challenges. An assessment of factors at the subsystem level that must be considered in developing an SEP vehicle for future exploration missions is presented. Overall concepts, design tradeoffs and pathways to achieve development readiness are discussed.

  6. Massively Parallel Processing for Fast and Accurate Stamping Simulations

    NASA Astrophysics Data System (ADS)

    Gress, Jeffrey J.; Xu, Siguang; Joshi, Ramesh; Wang, Chuan-tao; Paul, Sabu

    2005-08-01

    The competitive automotive market drives automotive manufacturers to speed up the vehicle development cycles and reduce the lead-time. Fast tooling development is one of the key areas to support fast and short vehicle development programs (VDP). In the past ten years, the stamping simulation has become the most effective validation tool in predicting and resolving all potential formability and quality problems before the dies are physically made. The stamping simulation and formability analysis has become an critical business segment in GM math-based die engineering process. As the simulation becomes as one of the major production tools in engineering factory, the simulation speed and accuracy are the two of the most important measures for stamping simulation technology. The speed and time-in-system of forming analysis becomes an even more critical to support the fast VDP and tooling readiness. Since 1997, General Motors Die Center has been working jointly with our software vendor to develop and implement a parallel version of simulation software for mass production analysis applications. By 2001, this technology was matured in the form of distributed memory processing (DMP) of draw die simulations in a networked distributed memory computing environment. In 2004, this technology was refined to massively parallel processing (MPP) and extended to line die forming analysis (draw, trim, flange, and associated spring-back) running on a dedicated computing environment. The evolution of this technology and the insight gained through the implementation of DM0P/MPP technology as well as performance benchmarks are discussed in this publication.

  7. Refinement of a Conceptual Model for Adolescent Readiness to Engage in End-of-Life Discussions.

    PubMed

    Bell, Cynthia J; Zimet, Gregory D; Hinds, Pamela S; Broome, Marion E; McDaniel, Anna M; Mays, Rose M; Champion, Victoria L

    Adolescents living with incurable cancer require ongoing support to process grief, emotions, and information as disease progresses including treatment options (phase 1 clinical trials and/or hospice/palliative care). Little is known about how adolescents become ready for such discussions. The purpose of this study was to explore the process of adolescent readiness for end-of-life preparedness discussions, generating a theoretical understanding for guiding clinical conversations when curative options are limited. We explored 2 in-depth cases across time using case-study methodology. An à priori conceptual model based on current end-of-life research guided data collection and analysis. Multiple sources including in-depth adolescent interviews generated data collection on model constructs. Analysis followed a logical sequence establishing a chain of evidence linking raw data to study conclusions. Synthesis and data triangulation across cases and time led to theoretical generalizations. Initially, we proposed a linear process of readiness with 3 domains: a cognitive domain (awareness), an emotional domain (acceptance), and a behavioral domain (willingness), which preceded preparedness. Findings led to conceptual model refinement showing readiness is a dynamic internal process that interacts with preparedness. Current awareness context facilitates the type of preparedness discussions (cognitive or emotional). Furthermore, social constraint inhibits discussions. Data support theoretical understanding of the dynamism of readiness. Future research that validates adolescent conceptualization will ensure age-appropriate readiness representation. Understanding the dynamic process of readiness for engaging in end-of-life preparedness provides clinician insight for guiding discussions that facilitate shared decision making and promote quality of life for adolescents and their families.

  8. The Development of Model for Measuring Railway Wheels Manufacturing Readiness Level

    NASA Astrophysics Data System (ADS)

    Inrawan Wiratmadja, Iwan; Mufid, Anas

    2016-02-01

    In an effort to grow the railway wheel industry in Indonesia and reduce the dependence on imports, Metal Industries Development Center (MIDC) makes the implementation of the railway wheel manufacturing technology in Indonesia. MIDC is an institution based on research and development having a task to research the production of railway wheels prototype and acts as a supervisor to the industry in Indonesia, for implementing the railway wheel manufacturing technology. The process of implementing manufacturing technology requires a lot of resources. Therefore it is necessary to measure the manufacturing readiness process. Measurement of railway wheels manufacturing readiness was in this study done using the manufacturing readiness level (MRL) model from the United States Department of Defense. MRL consists of 10 manufacturing readiness levels described by 90 criteria and 184 sub-criteria. To get a manufacturing readiness measurement instrument that is good and accurate, the development process involved experts through expert judgment method and validated with a content validity ratio (CVR). Measurement instrument developed in this study consist of 448 indicators. The measurement results show that MIDC's railway wheels manufacturing readiness is at the level 4. This shows that there is a gap between the current level of manufacturing readiness owned by MIDC and manufacturing readiness levels required to achieve the program objectives, which is level 5. To achieve the program objectives at level 5, a number of actions were required to be done by MIDC. Indicators that must be improved to be able to achieve level 5 are indicators related to the cost and financing, process capability and control, quality management, workers, and manufacturing management criteria.

  9. Self-employment as a solution for attitudinal barriers: a case study.

    PubMed

    Quinton, Melanie C

    2014-01-01

    This paper uses a case study to examine attitudinal barriers to employment and underemployment. We follow the career path of PR, a woman with multiple physical impairments, as she seeks financial independence through several employment strategies. In these, she faced attitudinal barriers and employment situations without opportunity for advancement. Eventually, PR opens her own business, turning to an alternative loan program to acquire the funds necessary to purchase a ready-made vehicle that matches her needs for accessible transportation. Use of this vehicle to provide delivery services for her business has more than doubled her income.

  10. 43 CFR 404.48 - What process will Reclamation follow to determine if a feasibility study is ready for review?

    Code of Federal Regulations, 2011 CFR

    2011-10-01

    ... determine if a feasibility study is ready for review? 404.48 Section 404.48 Public Lands: Interior... SUPPLY PROGRAM Feasibility Studies § 404.48 What process will Reclamation follow to determine if a feasibility study is ready for review? (a) Reclamation will evaluate whether the feasibility study adequately...

  11. Test Results for Entry Guidance Methods for Space Vehicles

    NASA Technical Reports Server (NTRS)

    Hanson, John M.; Jones, Robert E.

    2004-01-01

    There are a number of approaches to advanced guidance and control that have the potential for achieving the goals of significantly increasing reusable launch vehicle (or any space vehicle that enters an atmosphere) safety and reliability, and reducing the cost. This paper examines some approaches to entry guidance. An effort called Integration and Testing of Advanced Guidance and Control Technologies has recently completed a rigorous testing phase where these algorithms faced high-fidelity vehicle models and were required to perform a variety of representative tests. The algorithm developers spent substantial effort improving the algorithm performance in the testing. This paper lists the test cases used to demonstrate that the desired results are achieved, shows an automated test scoring method that greatly reduces the evaluation effort required, and displays results of the tests. Results show a significant improvement over previous guidance approaches. The two best-scoring algorithm approaches show roughly equivalent results and are ready to be applied to future vehicle concepts.

  12. Airframe Research and Technology for Hypersonic Airbreathing Vehicles

    NASA Technical Reports Server (NTRS)

    Glass, David E.; Merski, N. Ronald; Glass, Christopher E.

    2002-01-01

    The Hypersonics Investment Area (HIA) within NASA's Advanced Space Transportation Program (ASTP) has the responsibility to develop hypersonic airbreathing vehicles for access to space. The Airframe Research and Technology (AR and T) Project, as one of six projects in the HIA, will push the state-of-the-art in airframe and vehicle systems for low-cost, reliable, and safe space transportation. The individual technologies within the project are focused on advanced, breakthrough technologies in airframe and vehicle systems and cross-cutting activities that are the basis for improvements in these disciplines. Both low and medium technology readiness level (TRL) activities are being pursued. The key technical areas that will be addressed by the project include analysis and design tools, integrated vehicle health management (IVHM), composite (polymer, metal, and ceramic matrix) materials development, thermal/structural wall concepts, thermal protection systems, seals, leading edges, aerothermodynamics, and airframe/propulsion flowpath technology. Each of the technical areas or sub-projects within the Airframe R and T Project is described in this paper.

  13. KSC-2009-5862

    NASA Image and Video Library

    2009-10-23

    CAPE CANAVERAL, Fla. – In the Press Site auditorium at NASA's Kennedy Space Center in Florida, Bob Ess, NASA's mission manager for the Ares I-X flight test, participates in a news conference following the conclusion of the flight test readiness review, or FTRR, for the Ares I-X test rocket. During the meeting, senior NASA and contractor managers assessed the risks associated with the test and determined the rocket, support systems and procedures are ready for launch. The Ares I-X launch date was announced after the FTRR and is officially set for Oct. 27. For information on the Ares I-X vehicle and flight test, visit http://www.nasa.gov/aresIX. Photo credit: NASA/Jack Pfaller

  14. Advanced Launch System (ALS) actuation and power systems impact operability and cost

    NASA Technical Reports Server (NTRS)

    Sundberg, Gale R.

    1990-01-01

    To obtain the Advanced Launch System (ALS) primary goals of reduced costs and improved operability, there must be significant reductions in the launch operations and servicing requirements relative to current vehicle designs and practices. One of the primary methods for achieving these goals is by using vehicle electrical power system and controls for all actuation and avionics requirements. A brief status review of the ALS and its associated Advanced Development Program is presented to demonstrate maturation of those technologies that will help meet the overall operability and cost goals. The electric power and actuation systems are highlighted as a specific technology ready not only to meet the stringent ALS goals (cryogenic field valves and thrust vector controls with peak power demands to 75 hp), but also those of other launch vehicles, military and civilian aircraft, lunar/Martian vehicles, and a multitude of commercial applications.

  15. Advanced Launch System (ALS): Electrical actuation and power systems improve operability and cost picture

    NASA Technical Reports Server (NTRS)

    Sundberg, Gale R.

    1990-01-01

    To obtain the Advanced Launch System (ALS) primary goals of reduced costs and improved operability, there must be significant reductions in the launch operations and servicing requirements relative to current vehicle designs and practices. One of the primary methods for achieving these goals is by using vehicle electrical power system and controls for all actuation and avionics requirements. A brief status review of the ALS and its associated Advanced Development Program is presented to demonstrate maturation of those technologies that will help meet the overall operability and cost goals. The electric power and actuation systems are highlighted as a specific technology ready not only to meet the stringent ALS goals (cryogenic field valves and thrust vector controls with peak power demands to 75 hp), but also those of other launch vehicles, military and civilian aircraft, lunar/Martian vehicles, and a multitude of commercial applications.

  16. Advanced launch system (ALS) - Electrical actuation and power systems improve operability and cost picture

    NASA Technical Reports Server (NTRS)

    Sundberg, Gale R.

    1990-01-01

    To obtain the Advanced Launch System (ALS) primary goals of reduced costs and improved operability, there must be significant reductions in the launch operations and servicing requirements relative to current vehicle designs and practices. One of the primary methods for achieving these goals is by using vehicle electrrical power system and controls for all aviation and avionics requirements. A brief status review of the ALS and its associated Advanced Development Program is presented to demonstrate maturation of those technologies that will help meet the overall operability and cost goals. The electric power and actuation systems are highlighted as a sdpecific technology ready not only to meet the stringent ALS goals (cryogenic field valves and thrust vector controls with peak power demands to 75 hp), but also those of other launch vehicles, military ans civilian aircraft, lunar/Martian vehicles, and a multitude of comercial applications.

  17. Low lift-to-drag aero-assisted orbit transfer vehicles

    NASA Technical Reports Server (NTRS)

    Andrews, D. G.; Savage, R. T.

    1984-01-01

    The results of systems analysis conducted on low life drag ratio (L/D) aero-assisted orbit transfer vehicle (AOTV's) are presented. The objectives for this class of vehicle and formulate technology development plans and funding levels to bring the required technologies to readiness levels, as well as develop a credible decision data base encompassing the entire range of low L/D concepts for use in future NASA Aeroassist Orbit Transfer Vehicles studies. Each candidate low L/D concept, the aerobrake, the lifting brake, and the aeromaneuvering concept could be made to work with technologies achievable by the early 1990's. All concepts require flexible structure with flexible thermal protection system (TPS) to be successfully integrated into the shuttle orbiter for launch, all required improvements in guidance and control to fly the dispersed atmospheres at high altitude, and all concepts had potential to evolve from ground-based to space-based operations.

  18. Thermal Protection Test Bed Pathfinder Development Project

    NASA Technical Reports Server (NTRS)

    Snapp, Cooper

    2015-01-01

    In order to increase thermal protection capabilities for future reentry vehicles, a method to obtain relevant test data is required. Although arc jet testing can be used to obtain some data on materials, the best method to obtain these data is to actually expose them to an atmospheric reentry. The overprediction of the Orion EFT-1 flight data is an example of how the ground test to flight traceability is not fully understood. The RED-Data small reentry capsule developed by Terminal Velocity Aerospace is critical to understanding this traceability. In order to begin to utilize this technology, ES3 needs to be ready to build and integrate heat shields onto the RED-Data vehicle. Using a heritage Shuttle tile material for the heat shield will both allow valuable insight into the environment that the RED-Data vehicle can provide and give ES3 the knowledge and capability to build and integrate future heat shields for this vehicle.

  19. The Condition of College Readiness, 2009

    ERIC Educational Resources Information Center

    ACT, Inc., 2009

    2009-01-01

    Since 1959, ACT has collected and reported data on students' academic readiness for college. Because becoming ready for college is a process that occurs throughout elementary and secondary education, measuring academic performance over time in the context of college readiness provides meaningful and compelling information about the college…

  20. Advancing HIV/AIDS prevention among American Indians through capacity building and the community readiness model.

    PubMed

    Thurman, Pamela Jumper; Vernon, Irene S; Plested, Barbara

    2007-01-01

    Although HIV/AIDS prevention has presented challenges over the past 25 years, prevention does work! To be most effective, however, prevention must be specific to the culture and the nature of the community. Building the capacity of a community for prevention efforts is not an easy process. If capacity is to be sustained, it must be practical and utilize the resources that already exist in the community. Attitudes vary across communities; resources vary, political climates are constantly varied and changing. Communities are fluid-always changing, adapting, growing. They are "ready" for different things at different times. Readiness is a key issue! This article presents a model that has experienced a high level of success in building community capacity for effective prevention/intervention for HIV/AIDS and offers case studies for review. The Community Readiness Model provides both quantitative and qualitative information in a user-friendly structure that guides a community through the process of understanding the importance of the measure of readiness. The model identifies readiness- appropriate strategies, provides readiness scores for evaluation, and most important, involves community stakeholders in the process. The article will demonstrate the importance of developing strategies consistent with readiness levels for more cost-effective and successful prevention efforts.

  1. The Condition of College & Career Readiness, 2010

    ERIC Educational Resources Information Center

    ACT, Inc., 2010

    2010-01-01

    Since 1959, ACT has collected and reported data on students' academic readiness for college. Because becoming ready for college and career is a process that occurs throughout elementary and secondary education, measuring academic performance over time in the context of college and career readiness provides meaningful and compelling information…

  2. Apollo 17 Astronauts during EVA training

    NASA Image and Video Library

    1972-06-08

    S72-44423 (8 Sept. 1972) --- Two Apollo 17 crewmen ready a Lunar Roving Vehicle trainer following its deployment from a Lunar Module trainer in the Flight Crew Training Building at the Kennedy Space Center, Florida. Taking part in the Apollo 17 training exercise were astronauts Eugene A. Cernan (right), commander; and Harrison H. "Jack" Schmitt, lunar module pilot.

  3. Structures and materials technology issues for reusable launch vehicles

    NASA Technical Reports Server (NTRS)

    Dixon, S. C.; Tenney, D. R.; Rummler, D. R.; Wieting, A. R.; Bader, R. M.

    1985-01-01

    Projected space missions for both civil and defense needs require significant improvements in structures and materials technology for reusable launch vehicles: reductions in structural weight compared to the Space Shuttle Orbiter of up to 25% or more, a possible factor of 5 or more increase in mission life, increases in maximum use temperature of the external surface, reusable containment of cryogenic hydrogen and oxygen, significant reductions in operational costs, and possibly less lead time between technology readiness and initial operational capability. In addition, there is increasing interest in hypersonic airbreathing propulsion for launch and transmospheric vehicles, and such systems require regeneratively cooled structure. The technology issues are addressed, giving brief assessments of the state-of-the-art and proposed activities to meet the technology requirements in a timely manner.

  4. Foreign launch competition growing

    NASA Astrophysics Data System (ADS)

    Brodsky, R. F.; Wolfe, M. G.; Pryke, I. W.

    1986-07-01

    A survey is given of progress made by other nations in providing or preparing to provide satellite launch services. The European Space Agency has four generations of Ariane vehicles, with a fifth recently approved; a second launch facility in French Guiana that has become operational has raised the possible Ariane launch rate to 10 per year, although a May failure of an Ariane 2 put launches on hold. The French Hermes spaceplane and the British HOTOL are discussed. Under the auspices of the Italian National Space Plane, the Iris orbital transfer vehicle is developed and China's Long March vehicles and the Soviet Protons and SL-4 vehicles are discussed; the Soviets moreover are apparently developing not only a Saturn V-class heavy lift vehicle with a 150,000-kg capacity (about five times the largest U.S. capacity) but also a space shuttle and a spaceplane. Four Japanese launch vehicles and some vehicles in an Indian program are also ready to provide launch services. In this new, tough market for launch services, the customers barely outnumber the suppliers. The competition develops just as the Challenger and Titan disasters place the U.S. at a disadvantage and underline the hard work ahead to recoup its heretofore leading position in launch services.

  5. Can a pile of scrap unmask a new high technology? The A4/V-2 No V89 Bäckebo-torpeden

    NASA Astrophysics Data System (ADS)

    Ingemar Skoog, A.

    2013-04-01

    Three months before the first V-2 rocket attack on London a test vehicle crashed in southern Sweden on June 13, 1944. At this time the Allied only had limited knowledge about the rocket (A4/V-2) from agent reports and information from the Polish resistance investigating some remains from a crashed test vehicle in Poland. London was confronted with a new weapon supposedly able to carry an explosive warhead of several tons some 250 km. The A4/V-2 rocket test vehicle number V89 broke apart shortly before impacting ground. In a short time 2 t of metal parts and electrical equipment was collected and transported to Stockholm for investigations. A first Swedish report was ready by July 21, 1944 and the rocket parts were then transported to England for further investigations. By August 18, 1944 the Royal Aircraft Establishment (RAE) had its preliminary report ready. But how close to reality can a complex vehicle be reconstructed and the performance calculated from a pile of scrap by investigators dealing with a technology not seen before? In the early 1940s the state of art of liquid propellant rocket technology outside Germany was limited and the size of a liquid rocket engine for the likely performance hardly imaginable. The Swedish and British reports, at that time classified as top secret, have since been released and permit a very detailed analysis of the task to reconstruct the rocket vehicle, the engine itself and its performance. An assessment of the occurrence at Peenemünde and how the rocket became astray and fell in southern Sweden, together with the analyses by Swedish and British military investigators give a unique insight into the true nature of the V89. It shows the real capabilities of early aeronautical accident investigation methods in combination with solid engineering knowledge to unmask a new high technology.

  6. EVermont Renewable Hydrogen Production and Transportation Fueling System

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Garabedian, Harold T.

    2008-03-30

    A great deal of research funding is being devoted to the use of hydrogen for transportation fuel, particularly in the development of fuel cell vehicles. When this research bears fruit in the form of consumer-ready vehicles, will the fueling infrastructure be ready? Will the required fueling systems work in cold climates as well as they do in warm areas? Will we be sure that production of hydrogen as the energy carrier of choice for our transit system is the most energy efficient and environmentally friendly option? Will consumers understand this fuel and how to handle it? Those are questions addressedmore » by the EVermont Wind to Wheels Hydrogen Project: Sustainable Transportation. The hydrogen fueling infrastructure consists of three primary subcomponents: a hydrogen generator (electrolyzer), a compression and storage system, and a dispenser. The generated fuel is then used to provide transportation as a motor fuel. EVermont Inc., started in 1993 by then governor Howard Dean, is a public-private partnership of entities interested in documenting and advancing the performance of advanced technology vehicles that are sustainable and less burdensome on the environment, especially in areas of cold climates, hilly terrain and with rural settlement patterns. EVermont has developed a demonstration wind powered hydrogen fuel producing filling system that uses electrolysis, compression to 5000 psi and a hydrogen burning vehicle that functions reliably in cold climates. And that fuel is then used to meet transportation needs in a hybrid electric vehicle whose internal combustion engine has been converted to operate on hydrogen Sponsored by the DOE EERE Hydrogen, Fuel Cells & Infrastructure Technologies (HFC&IT) Program, the purpose of the project is to test the viability of sustainably produced hydrogen for use as a transportation fuel in a cold climate with hilly terrain and rural settlement patterns. Specifically, the project addresses the challenge of building a renewable transportation energy capable system. The prime energy for this project comes from an agreement with a wind turbine operator.« less

  7. Robot Electronics Architecture

    NASA Technical Reports Server (NTRS)

    Garrett, Michael; Magnone, Lee; Aghazarian, Hrand; Baumgartner, Eric; Kennedy, Brett

    2008-01-01

    An electronics architecture has been developed to enable the rapid construction and testing of prototypes of robotic systems. This architecture is designed to be a research vehicle of great stability, reliability, and versatility. A system according to this architecture can easily be reconfigured (including expanded or contracted) to satisfy a variety of needs with respect to input, output, processing of data, sensing, actuation, and power. The architecture affords a variety of expandable input/output options that enable ready integration of instruments, actuators, sensors, and other devices as independent modular units. The separation of different electrical functions onto independent circuit boards facilitates the development of corresponding simple and modular software interfaces. As a result, both hardware and software can be made to expand or contract in modular fashion while expending a minimum of time and effort.

  8. Atmospheric In-Situ Resource Utilization For Mars Application

    NASA Technical Reports Server (NTRS)

    Mullen, Macy; Muscatello, Anthony; Hintze, Paul; Meier, Anne; Bayliss, Jon; Petersen, Elspeth

    2016-01-01

    NASA now looks to Mars as the next step in human space exploration. A couple of challenges of such a destination include affordability and weight/volume limitations. As a way to solve these issues NASA is looking into the practice of In-Situ Resource Utilization (ISRU). Instead of manufacturing and bringing all the supplies necessary for a Mars mission and return trip, the goal is to send a preliminary mission to produce reserves of propellant, water, and oxygen on site. Part of this effort includes the Atmospheric Processing Module (APM). The APM is part of a lander that is composed of multiple compartments, each having a unique function; regolith collection/processing, water processing, atmospheric processing, and product storage. The overall goal is to develop the capability to produce methane (CH4) and oxygen as a fuel/oxidizer combo via a Sabatier reaction using resources from the Martian environment. The APM still must undergo modifications in design, and perhaps method, to become flight-ready to produce methane at the level of purity and quantity needed for a vehicle.

  9. Critical quality attributes, in vitro release and correlated in vitro skin permeation-in vivo tape stripping collective data for demonstrating therapeutic (non)equivalence of topical semisolids: A case study of "ready-to-use" vehicles.

    PubMed

    Ilić, Tanja; Pantelić, Ivana; Lunter, Dominique; Đorđević, Sanela; Marković, Bojan; Ranković, Dragana; Daniels, Rolf; Savić, Snežana

    2017-08-07

    This work aimed to prove the ability of "ready-to-use" topical vehicles based on alkyl polyglucoside-mixed emulsifier (with/without co-solvent modifications) to replace the conventionally used pharmacopoeial bases (e.g., non-ionic hydrophilic cream) in compounding practice. For this purpose, considering the regulatory efforts to establish alternative, scientifically valid methods for evaluating therapeutic equivalence of topical semisolids, we performed a comparative assessment of microstructure, selected critical quality attributes (CQAs) and in vitro/in vivo product performances, by utilizing aceclofenac as a model drug. The differences in composition between investigated samples have imposed remarkable variances in monitored CQAs (particularly in the amount of aceclofenac dissolved, rheological properties and water distribution mode), reflecting the distinct differences in microstructure formed, as partially observed by polarization microscopy and confocal Raman spectral imaging. Although not fully indicative of the in vivo performances, in vitro release data (vertical diffusion vs. immersion cells) proved the microstructure peculiarities, asserting the rheological properties as decisive factor for obtained liberation profiles. Contrary, in vitro permeation results obtained using pig ear epidermis correlated well with in vivo dermatopharmacokinetic data and distinguished unequivocally between tested formulations, emphasizing the importance of skin/vehicle interactions. In summary, suggested multi-faceted approach can provide adequate proof on topical semisolids therapeutic equivalence or lack thereof. Copyright © 2017 Elsevier B.V. All rights reserved.

  10. Detection of braking intention in diverse situations during simulated driving based on EEG feature combination.

    PubMed

    Kim, Il-Hwa; Kim, Jeong-Woo; Haufe, Stefan; Lee, Seong-Whan

    2015-02-01

    We developed a simulated driving environment for studying neural correlates of emergency braking in diversified driving situations. We further investigated to what extent these neural correlates can be used to detect a participant's braking intention prior to the behavioral response. We measured electroencephalographic (EEG) and electromyographic signals during simulated driving. Fifteen participants drove a virtual vehicle and were exposed to several kinds of traffic situations in a simulator system, while EEG signals were measured. After that, we extracted characteristic features to categorize whether the driver intended to brake or not. Our system shows excellent detection performance in a broad range of possible emergency situations. In particular, we were able to distinguish three different kinds of emergency situations (sudden stop of a preceding vehicle, sudden cutting-in of a vehicle from the side and unexpected appearance of a pedestrian) from non-emergency (soft) braking situations, as well as from situations in which no braking was required, but the sensory stimulation was similar to stimulations inducing an emergency situation (e.g., the sudden stop of a vehicle on a neighboring lane). We proposed a novel feature combination comprising movement-related potentials such as the readiness potential, event-related desynchronization features besides the event-related potentials (ERP) features used in a previous study. The performance of predicting braking intention based on our proposed feature combination was superior compared to using only ERP features. Our study suggests that emergency situations are characterized by specific neural patterns of sensory perception and processing, as well as motor preparation and execution, which can be utilized by neurotechnology based braking assistance systems.

  11. Air-Powered Projectile Launcher

    NASA Technical Reports Server (NTRS)

    Andrews, T.; Bjorklund, R. A.; Elliott, D. G.; Jones, L. K.

    1987-01-01

    Air-powered launcher fires plastic projectiles without using explosive propellants. Does not generate high temperatures. Launcher developed for combat training for U.S. Army. With reservoir pressurized, air launcher ready to fire. When pilot valve opened, sleeve (main valve) moves to rear. Projectile rapidly propelled through barrel, pushed by air from reservoir. Potential applications in seismic measurements, avalanche control, and testing impact resistance of windshields on vehicles.

  12. 21st Century Readiness Skills for Career and Technical Education

    ERIC Educational Resources Information Center

    Bennett, Tyrone L.

    2012-01-01

    The 21st century has embraced the technological age by storm and has approached us quicker than most have expected, leaving many still stuck in the 20th century. Technical careers require very skilled workers and their education has sprung as a strong vehicle all over the country but still most of our employed citizens, especially the youth, have…

  13. Status of shuttle fuel cell technology program.

    NASA Technical Reports Server (NTRS)

    Rice, W. E.; Bell, D., III

    1972-01-01

    The hydrogen-oxygen fuel cell has been proved as an efficient and reliable electrical power supply for NASA manned-space-flight vehicles. It has thus ensured a role in the Space Shuttle Program as the primary electrical power supply for the Orbiter vehicle. The advanced fuel cell technology programs conducted under the management of the NASA Manned Spacecraft Center over the past two years have resulted in a high level of technical readiness in fuel cell power generation to support shuttle mission requirements. These programs have taken advantage of technological developments that have occurred since the designs were completed for the Gemini and Apollo fuel cells.

  14. The Orbital Maneuvering Vehicle Training Facility visual system concept

    NASA Technical Reports Server (NTRS)

    Williams, Keith

    1989-01-01

    The purpose of the Orbital Maneuvering Vehicle (OMV) Training Facility (OTF) is to provide effective training for OMV pilots. A critical part of the training environment is the Visual System, which will simulate the video scenes produced by the OMV Closed-Circuit Television (CCTV) system. The simulation will include camera models, dynamic target models, moving appendages, and scene degradation due to the compression/decompression of video signal. Video system malfunctions will also be provided to ensure that the pilot is ready to meet all challenges the real-world might provide. One possible visual system configuration for the training facility that will meet existing requirements is described.

  15. Manufacturing Methods and Technology Program Plan, CY 1983,

    DTIC Science & Technology

    1983-09-01

    vehicles will fill the need for an armored ": vehicle that can be moved rapidly and fight effectively in nearly any contingency area. Experience ...00000D0000 0 0 U. 00ODO CO~ 00 00 OD DO O O DODO CID OD00 O 00 U OD 1 CI C tO O wn > LL) U, 0. 0w Lnn 0 0 8- V)ᝰ a z. -5Jw .DF - U,8z 9 8 - 58 t 3> z 30...Readiness Command -" ATTN: DRSTS-PLE, Mr. Don G. Doll 4300 Goodfellow Blvd. C: 314 263-2218 St. Louis, MO 63120 AV: 693-2218 Cl q 4 MERADCOH US Army

  16. Ready, Set, Change! Development and usability testing of an online readiness for change decision support tool for healthcare organizations.

    PubMed

    Timmings, Caitlyn; Khan, Sobia; Moore, Julia E; Marquez, Christine; Pyka, Kasha; Straus, Sharon E

    2016-02-24

    To address challenges related to selecting a valid, reliable, and appropriate readiness assessment measure in practice, we developed an online decision support tool to aid frontline implementers in healthcare settings in this process. The focus of this paper is to describe a multi-step, end-user driven approach to developing this tool for use during the planning stages of implementation. A multi-phase, end-user driven approach was used to develop and test the usability of a readiness decision support tool. First, readiness assessment measures that are valid, reliable, and appropriate for healthcare settings were identified from a systematic review. Second, a mapping exercise was performed to categorize individual items of included measures according to key readiness constructs from an existing framework. Third, a modified Delphi process was used to collect stakeholder ratings of the included measures on domains of feasibility, relevance, and likelihood to recommend. Fourth, two versions of a decision support tool prototype were developed and evaluated for usability. Nine valid and reliable readiness assessment measures were included in the decision support tool. The mapping exercise revealed that of the nine measures, most measures (78 %) focused on assessing readiness for change at the organizational versus the individual level, and that four measures (44 %) represented all constructs of organizational readiness. During the modified Delphi process, stakeholders rated most measures as feasible and relevant for use in practice, and reported that they would be likely to recommend use of most measures. Using data from the mapping exercise and stakeholder panel, an algorithm was developed to link users to a measure based on characteristics of their organizational setting and their readiness for change assessment priorities. Usability testing yielded recommendations that were used to refine the Ready, Set, Change! decision support tool . Ready, Set, Change! decision support tool is an implementation support that is designed to facilitate the routine incorporation of a readiness assessment as an early step in implementation. Use of this tool in practice may offer time and resource-saving implications for implementation.

  17. Flight Testing of the Space Launch System (SLS) Adaptive Augmenting Control (AAC) Algorithm on an F/A-18

    NASA Technical Reports Server (NTRS)

    Dennehy, Cornelius J.; VanZwieten, Tannen S.; Hanson, Curtis E.; Wall, John H.; Miller, Chris J.; Gilligan, Eric T.; Orr, Jeb S.

    2014-01-01

    The Marshall Space Flight Center (MSFC) Flight Mechanics and Analysis Division developed an adaptive augmenting control (AAC) algorithm for launch vehicles that improves robustness and performance on an as-needed basis by adapting a classical control algorithm to unexpected environments or variations in vehicle dynamics. This was baselined as part of the Space Launch System (SLS) flight control system. The NASA Engineering and Safety Center (NESC) was asked to partner with the SLS Program and the Space Technology Mission Directorate (STMD) Game Changing Development Program (GCDP) to flight test the AAC algorithm on a manned aircraft that can achieve a high level of dynamic similarity to a launch vehicle and raise the technology readiness of the algorithm early in the program. This document reports the outcome of the NESC assessment.

  18. Closed End Launch Tube (CELT)

    NASA Technical Reports Server (NTRS)

    Lueck, Dale E.; Parrish, Clyde F.; Delgado, H. (Technical Monitor)

    2000-01-01

    As an alternative to magnetic propulsion for launch assist, the authors propose a pneumatic launch assist system. Using off the shelf components, coupled with familiar steel and concrete construction, a launch assist system can be brought from the initial feasibility stage, through a flight capable 5000 kg. demonstrator to a deployed full size launch assist system in 10 years. The final system would be capable of accelerating a 450,000 kg. vehicle to 270 meters per second. The CELT system uses commercially available compressors and valves to build a fail-safe system in less than half the time of a full Mag-Lev (magnetic levitation) system, and at a small fraction of the development cost. The resulting system could be ready in time to support some Gen 2 (generation 2) vehicles, as well as the proposed Gen 3 vehicle.

  19. Test Results for Entry Guidance Methods for Reusable Launch Vehicles

    NASA Technical Reports Server (NTRS)

    Hanson, John M.; Jones, Robert E.

    2003-01-01

    There are a number of approaches to advanced guidance and control (AG&C) that have the potential for achieving the goals of significantly increasing reusable launch vehicle (RLV) safety and reliability, and reducing the cost. This paper examines some approaches to entry guidance. An effort called Integration and Testing of Advanced Guidance and Control Technologies (ITAGCT) has recently completed a rigorous testing phase where these algorithms faced high-fidelity vehicle models and were required to perform a variety of representative tests. The algorithm developers spent substantial effort improving the algorithm performance in the testing. This paper lists the test cases used to demonstrate that the desired results are achieved, shows an automated test scoring method that greatly reduces the evaluation effort required, and displays results of the tests. Results show a significant improvement over previous guidance approaches. The two best-scoring algorithm approaches show roughly equivalent results and are ready to be applied to future reusable vehicle concepts.

  20. Structural Optimisation Of Payload Fairings

    NASA Astrophysics Data System (ADS)

    Santschi, Y.; Eaton, N.; Verheyden, S.; Michaud, V.

    2012-07-01

    RUAG Space are developing materials and processing technologies for manufacture of the Next Generation Launcher (NGL) payload fairing, together with the Laboratory of Polymer and Composite Technology at the EPFL, in a project running under the ESA Future Launchers Preparatory Program (FLPP). In this paper the general aims and scope of the project are described, details of the results obtained shall be presented at a later stage. RUAG Space design, develop and manufacture fairings for the European launch vehicles Ariane 5 and VEGA using well proven composite materials and production methods which provide adequate cost/performance ratio for these applications. However, the NGL shall make full use of innovations in materials and process technologies to achieve a gain in performance at a much reduced overall manufacturing cost. NGL is scheduled to become operational in 2025, with actual development beginning in 2014. In this current project the basic technology is being developed and validated, in readiness for application in the NGL. For this new application, an entirely new approach to the fairing manufacture is evaluated.

  1. A new intuitionistic fuzzy rule-based decision-making system for an operating system process scheduler.

    PubMed

    Butt, Muhammad Arif; Akram, Muhammad

    2016-01-01

    We present a new intuitionistic fuzzy rule-based decision-making system based on intuitionistic fuzzy sets for a process scheduler of a batch operating system. Our proposed intuitionistic fuzzy scheduling algorithm, inputs the nice value and burst time of all available processes in the ready queue, intuitionistically fuzzify the input values, triggers appropriate rules of our intuitionistic fuzzy inference engine and finally calculates the dynamic priority (dp) of all the processes in the ready queue. Once the dp of every process is calculated the ready queue is sorted in decreasing order of dp of every process. The process with maximum dp value is sent to the central processing unit for execution. Finally, we show complete working of our algorithm on two different data sets and give comparisons with some standard non-preemptive process schedulers.

  2. A Communications Network for Cislunar Operations

    NASA Technical Reports Server (NTRS)

    Burleigh, Scott

    2012-01-01

    Reliable and efficient communications will be critical to the success of commercial flight operations in cislunar space. The Internet is not well-suited to meeting this requirement. But the Delay-Tolerant Networking (DTN) architecture is. The DTN protocols are well-documented and implementations are mature. We think DTN will be ready to support low-cost, low-risk cislunar networking by the time the vehicles are in place.

  3. United States Marine Corps Expeditionary Energy Strategy and Implementation Plan

    DTIC Science & Technology

    2011-02-01

    Support System (NTCSS, OOMA/OIMA), and Aircraft Inventory Readiness and Reporting System (AIRRS) data in the Naval Aviation Logistics Data Analysis...Corps’ share is used for operational purposes—fuel for training, moving and sustaining our forces, aircraft and weapons platforms .1 Within this, and...this 75% was consumed by ‘ground forces,’ which includes use by vehicles, generators, and other sustainment equipment . Aircraft consumed

  4. Hydrogen powered bus

    ScienceCinema

    Glass, Bob; Mathis, Mike; Cochran, Ron; Garback, John

    2018-06-08

    Take a ride on a new type of bus, fueled by hydrogen. These hydrogen taxis are part of a Department of Energy-funded deployment of hydrogen powered vehicles and fueling infrastructure at nine federal facilities across the country to demonstrate this market-ready advanced technology. Produced and leased by Ford Motor Company , they consist of one 12- passenger bus and one nine-passenger bus. More information at: http://go.usa.gov/Tgr

  5. KSC-02pd0087

    NASA Image and Video Library

    2002-01-10

    VANDENBERG AFB, CALIF. -- Technicians ready the Pegasus XL rocket, the vehicle that will launch the High Energy Solar Spectroscopic Imager (HESSI), for flight to Florida. The primary mission of HESSI is to explore the basic physics of particle acceleration and energy release in solar flares. The launch of PegasusXL/HESSI is scheduled for Feb. 5, 2002, from beneath an Orbital Sciences Corp. L-1011 aircraft over the Atlantic Ocean

  6. Investigation of Advanced Propellants to Enable Single Stage to Orbit Launch Vehicles

    DTIC Science & Technology

    2006-10-30

    reduced as a consequence. Stanley et al. also investigated the effecting of varying the engine O:F ratio. A higher O:F than the point of departure...release; distribution unlimited APPROVED FOR FINAL DRAFT SUBMISSION For the Department of Mechanical Engineering : We, the undersigned, certify...is ready to be reviewed. Jason Mossman Project Author Walter Loscutoff (Chair) Department of Mechanical Engineering

  7. STS-32 Mission Specialist (MS) Ivins peers into IMAX camera viewfinder

    NASA Technical Reports Server (NTRS)

    1989-01-01

    STS-32 Mission Specialist (MS) Marsha S. Ivins looks through IMAX camera viewfinder during briefing and training session conducted in the JSC Mockup and Integration Laboratory (MAIL) Bldg 9B. Technicians on either side of Ivins are ready to assist with the training activity. The IMAX camera will be used onboard Columbia, Orbiter Vehicle (OV) 102, during the STS-32 mission.

  8. The 3rd ACR in TAL’AFAR: Challenges and Adaptations

    DTIC Science & Technology

    2008-01-08

    raisins, and cucumbers, usually served in the local diet with grilled lamb and unleavened bread. Tal’Afar contains 18 distinctly named neighbor...accordingly, visiting the Joint Readiness Training Center at Ft. Polk, Louisiana, in the fall of 2002 to brush up...less confront an ill- defined insurgency. Featuring Bradley fighting vehicles, Abrams tanks, Apache attack helicopters, and armed-to-the- teeth

  9. The concept of readiness to change.

    PubMed

    Dalton, Cindy C; Gottlieb, Laurie N

    2003-04-01

    Readiness is associated with change, yet there is little understanding of this construct. The purpose of this study was to examine readiness; its referents, associated factors and the resulting consequences. In the course of nursing five clients living with multiple sclerosis over a 7-month period using a Reflective Practice Model, data were systematically gathered using open-ended and then more focused questioning. Data collected during 42 client encounters (28 face-to-face encounters; 14 telephone contacts) were analysed using Chinn and Kramer's concept analysis technique. Findings. The concept of readiness was inductively derived. Readiness is both a state and a process. Before clients can create change they need to become ready to change. A number of factors trigger readiness. These include when: (a) clients perceive that a health concern is not going to resolve, (b) a change in a client's physical condition takes on new significance, (c) clients feel better able to manage their stress, (d) clients have sufficient energy, (e) clients perceive that they have adequate support in undertaking change. When one or more of these factors is present clients become ready to consider change. The process of readiness involves recognizing the need to change, weighing the costs and benefits and, when benefits outweigh costs, planning for change. The desire to change and to take action determines clients' degree of readiness. When they experience a high degree of readiness they report less anger, less depression, and view their condition in a more positive light. In contrast, when they experience a low degree of readiness they report feeling depressed, afraid and vulnerable in the face of change. Nursing has an important role to play in creating conditions to support change. To fulfil this role, nurses need to be able to assess readiness for change and the factors that enable it and then to intervene in ways that facilitate readiness.

  10. KSC-03pd0507

    NASA Image and Video Library

    2003-02-19

    KENNEDY SPACE CENTER, FLA. -- The Pegasus launch vehicle is on a transporter, ready to be moved from the Skid Strip, Cape Canaveral Air Force Station, to the Multi-Payload Processing Facility (MPPF) at KSC. There it will be mated to the Galaxy Evolution Explorer (GALEX). The Pegasus will carry the GALEX, an orbiting space telescope that will observe galaxies in ultraviolet light across 10 billion years of cosmic history, into orbit. Led by the California Institute of Technology, GALEX will conduct several first-of-a-kind sky surveys, including an extra-galactic (beyond our galaxy) ultraviolet all-sky survey. During its 29-month mission GALEX will produce the first comprehensive map of a Universe of galaxies under construction, bringing more understanding of how galaxies like the Milky Way were formed. GALEX is due to be launched from Cape Canaveral Air Force Station March 25.

  11. KSC-03pd0508

    NASA Image and Video Library

    2003-02-19

    KENNEDY SPACE CENTER, FLA. -- The Pegasus launch vehicle is on a transporter, ready to be moved from the Skid Strip, Cape Canaveral Air Force Station, to the Multi-Payload Processing Facility (MPPF) at KSC. There it will be mated to the Galaxy Evolution Explorer (GALEX). The Pegasus will carry into orbit the GALEX, an orbiting space telescope that will observe galaxies in ultraviolet light across 10 billion years of cosmic history. Led by the California Institute of Technology, GALEX will conduct several first-of-a-kind sky surveys, including an extra-galactic (beyond our galaxy) ultraviolet all-sky survey. During its 29-month mission GALEX will produce the first comprehensive map of a Universe of galaxies under construction, bringing more understanding of how galaxies like the Milky Way were formed. GALEX is due to be launched from Cape Canaveral Air Force Station March 25.

  12. Social Information Processing Patterns, Social Skills, and School Readiness in Preschool Children

    ERIC Educational Resources Information Center

    Ziv, Yair

    2013-01-01

    The links among social information processing, social competence, and school readiness were examined in this short-term longitudinal study with a sample of 198 preschool children. Data on social information processing were obtained via child interview, data on child social competence were obtained via teacher report, and data on school readiness…

  13. 32 CFR 813.7 - Readiness reporting.

    Code of Federal Regulations, 2011 CFR

    2011-07-01

    ... 32 National Defense 6 2011-07-01 2011-07-01 false Readiness reporting. 813.7 Section 813.7 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE SALES AND SERVICES VISUAL... report readiness status through the SORTS process. See AFI 10-201, Status of Resources and Training...

  14. 32 CFR 813.7 - Readiness reporting.

    Code of Federal Regulations, 2013 CFR

    2013-07-01

    ... 32 National Defense 6 2013-07-01 2013-07-01 false Readiness reporting. 813.7 Section 813.7 National Defense Department of Defense (Continued) DEPARTMENT OF THE AIR FORCE SALES AND SERVICES VISUAL... report readiness status through the SORTS process. See AFI 10-201, Status of Resources and Training...

  15. The evolutionary emergence of what we call "emotions".

    PubMed

    Frijda, Nico H

    2016-01-01

    The term "emotion" is not precise. It refers to an assemblage of processes that contribute to how we relate to the social and physical world. We need to understand the functional bases of such processes, and one such basis is action readiness. Action readiness is the preparation for movement or action. Preparation for movement occurs in all animals. In more recently evolved species, such as birds and mammals, preparation for directed action is found as well. Action readiness is the basis for the states we now call emotions, but its importance goes far beyond emotions: action readiness is an elementary aspect of the way autonomous living beings regulate their interactions with the world.

  16. e-Health readiness assessment factors and measuring tools: A systematic review.

    PubMed

    Yusif, Salifu; Hafeez-Baig, Abdul; Soar, Jeffrey

    2017-11-01

    The evolving, adoption and high failure nature of health information technology (HIT)/IS/T systems requires effective readiness assessment to avert increasing failures while increasing system benefits. However, literature on HIT readiness assessment is myriad and fragmented. This review bares the contours of the available literature concluding in a set of manageable and usable recommendations for policymakers, researchers, individuals and organizations intending to assess readiness for any HIT implementation. Identify studies, analyze readiness factors and offer recommendations. Published articles 1995-2016 were searched using Medline/PubMed, Cinahl, Web of Science, PsychInfo, ProQuest. Studies were included if they were assessing IS/T/mHealth readiness in the context of HIT. Articles not written in English were excluded. Themes that emerged in the process of the data synthesis were thematically analysed and interpreted. Analyzed themes were found across 63 articles. In accordance with their prevalence of use, they included but not limited to "Technological readiness", 30 (46%); "Core/Need/Motivational readiness", 23 (37%); "Acceptance and use readiness", 19 (29%); "Organizational readiness", 20 (21%); "IT skills/Training/Learning readiness" (18%), "Engagement readiness", 16 (24%) and "Societal readiness" (14%). Despite their prevalence in use, "Technological readiness", "Motivational readiness" and "Engagement readiness" all had myriad and unreliable measuring tools. Core readiness had relatively reliable measuring tools, which repeatedly been used in various readiness assessment studies CONCLUSION: Thus, there is the need for reliable measuring tools for even the most commonly used readiness assessment factors/constructs: Core readiness, Engagement and buy-ins readiness, Technological readiness and IT Skills readiness as this could serve as an immediate step in conducting effective/reliable e-Health readiness assessment, which could lead to reduced HIT implementation failures. Copyright © 2017 Elsevier B.V. All rights reserved.

  17. Medical Readiness of the Reserve Component.

    PubMed

    Brauner, Marygail K; Jackson, Timothy; Gayton, Elizabeth

    2012-01-01

    The reserve components (RCs) of the U.S. military must ensure that reservists are not only properly equipped and trained, but also medically ready to serve. Medical readiness means that service members are free from health-related conditions, including dental conditions, that could limit their ability to carry out their duties. Medically ready reservists require less medical and dental support in theater and fewer medical evacuations from theater, both of which save money and free assets for other purposes. This article identifies existing medical readiness requirements, quantifies the current status of RC medical readiness, identifies obstacles to achieving compliance, and suggests options for improving medical readiness in a cost-effective manner. The authors find that time and expense are the major barriers to the RCs achieving their overall goals for medical readiness. Recommendations include standardizing medical readiness criteria across services, improving data reporting and archiving processes, providing incentives to individuals and units to achieve medical readiness, and continuing to extend TRICARE coverage to reservists prior to deployment.

  18. Mission Simulation Facility: Simulation Support for Autonomy Development

    NASA Technical Reports Server (NTRS)

    Pisanich, Greg; Plice, Laura; Neukom, Christian; Flueckiger, Lorenzo; Wagner, Michael

    2003-01-01

    The Mission Simulation Facility (MSF) supports research in autonomy technology for planetary exploration vehicles. Using HLA (High Level Architecture) across distributed computers, the MSF connects users autonomy algorithms with provided or third-party simulations of robotic vehicles and planetary surface environments, including onboard components and scientific instruments. Simulation fidelity is variable to meet changing needs as autonomy technology advances in Technical Readiness Level (TRL). A virtual robot operating in a virtual environment offers numerous advantages over actual hardware, including availability, simplicity, and risk mitigation. The MSF is in use by researchers at NASA Ames Research Center (ARC) and has demonstrated basic functionality. Continuing work will support the needs of a broader user base.

  19. KSC-97pc633

    NASA Image and Video Library

    1997-04-08

    The Lockheed Martin Atlas 1 expendable launch vehicle (AC-79) which will carry the GOES-K advanced weather satellite undergoes a critical prelaunch test with its mobile service tower pulled back. The Wet Dress Rehearsal is a major prelaunch test designed to demonstrate, in part, the launch readiness of the vehicle and launch support equipment. AC-79 will be the final launch of an Atlas 1 rocket, a derivative of the original Atlas Centaur which had its first successful launch for NASA in 1963. Future launches of Geostationary Operational Environmental Satellites (GOES) in the current series will be on Atlas II vehicles. The GOES satellites are owned and operated by the National Oceanic and Atmospheric Administration (NOAA); NASA manages the design, development and launch of the spacecraft. The launch of AC-79 with the GOES-K is targeted for April 24 during a launch window which extends from 1:50-3:09 a.m. EDT

  20. KSC-97pc632

    NASA Image and Video Library

    1997-04-08

    The Lockheed Martin Atlas 1 expendable launch vehicle (AC-79) which will carry the GOES-K advanced weather satellite undergoes a critical prelaunch test with its mobile service tower pulled back. The Wet Dress Rehearsal is a major prelaunch test designed to demonstrate, in part, the launch readiness of the vehicle and launch support equipment. AC-79 will be the final launch of an Atlas 1 rocket, a derivative of the original Atlas Centaur which had its first successful launch for NASA in 1963. Future launches of Geostationary Operational Environmental Satellites (GOES) in the current series will be on Atlas II vehicles. The GOES satellites are owned and operated by the National Oceanic and Atmospheric Administration (NOAA); NASA manages the design, development and launch of the spacecraft. The launch of AC-79 with the GOES-K is targeted for April 24 during a launch window which extends from 1:50-3:09 a.m. EDT

  1. KSC-04pd1829

    NASA Image and Video Library

    2004-09-03

    KENNEDY SPACE CENTER, FLA. - At Vandenberg Air Force Base in California, the Demonstration of Autonomous Rendezvous Technology (DART) spacecraft (foreground) is ready to be mated to second and third stages in preparation for the launch aboard the Orbital Sciences Pegasus XL launch vehicle. Pegasus will launch DART into a circular polar orbit of approximately 475 miles. Built for NASA by Orbital Sciences Corporation, DART was designed as an advanced flight demonstrator to locate and maneuver near an orbiting satellite. DART weighs about 800 pounds and is nearly 6 feet long and 3 feet in diameter. DART is designed to demonstrate technologies required for a spacecraft to locate and rendezvous, or maneuver close to, other craft in space. Results from the DART mission will aid in the development of NASA’s Crew Exploration Vehicle and will also assist in vehicle development for crew transfer and crew rescue capability to and from the International Space Station.

  2. Gelled-electrolyte batteries for electric vehicles

    NASA Astrophysics Data System (ADS)

    Tuphorn, Hans

    Increasing problems of air pollution have pushed activities of electric vehicle projects worldwide and in spite of projects for developing new battery systems for high energy densities, today lead/acid batteries are almost the single system, ready for technical usage in this application. Valve-regulated lead/acid batteries with gelled electrolyte have the advantage that no maintenance is required and because the gel system does not cause problems with electrolyte stratification, no additional appliances for central filling or acid addition are required, which makes the system simple. Those batteries with high density active masses indicate high endurance results and field tests with 40 VW-CityStromers, equipped with 96 V/160 A h gel batteries with thermal management show good results during four years. In addition, gelled lead/acid batteries possess superior high rate performance compared with conventional lead/acid batteries, which guarantees good acceleration results of the car and which makes the system recommendable for application in electric vehicles.

  3. The hybrid bio-inspired aerial vehicle: Concept and SIMSCAPE flight simulation.

    PubMed

    Tao Zhang; Su, Steven; Nguyen, Hung T

    2016-08-01

    This paper introduces a Silver Gull-inspired hybrid aerial vehicle, the Super Sydney Silver Gull (SSSG), which is able to vary its structure, under different manoeuvre requirements, to implement three flight modes: the flapping wing flight, the fixed wing flight, and the quadcopter flight (the rotary wing flight of Unmanned Air Vehicle). Specifically, through proper mechanism design and flight mode transition, the SSSG can imitate the Silver Gull's flight gesture during flapping flight, save power consuming by switching to the fixed wing flight mode during long-range cruising, and hover at targeted area when transferring to quadcopter flight mode. Based on the aerodynamic models, the Simscape, a product of MathWorks, is used to simulate and analyse the performance of the SSSG's flight modes. The entity simulation results indicate that the created SSSG's 3D model is feasible and ready to be manufactured for further flight tests.

  4. New Explorer-class AUV Ready for Deep-water, High-resolution Habitat Mapping Studies

    NASA Astrophysics Data System (ADS)

    Potts, T. A.; Shepard, A.

    2006-12-01

    In 2002, a partnership was formed to design, construct, field test, and operate an Autonomous Underwater Vehicle (AUV) equipped to provide high-resolution (<1 m) maps of offshore seafloor habitats down to 2200 meters depth. An ISE Explorer-class AUV was constructed and equipped to conduct seafloor characterization via multi-beam EM2000 providing both bathymetry and backscatter. Three 10-day cruises will be conducted between August and November 2006 to put the vehicle through its paces and refine operating protocols. It is anticipated that the vehicle will log over 200 hours of bottom time and acquire over 30 GB of data at proposed marine protected area sites off North and South Carolina, Gray's Reef National Marine Sanctuary off Georgia, and at the Oculina Habitat Area of Particular Concern off the east coast of Florida. The AUV will begin supporting competitively reviewed science projects starting in 2007.

  5. Readiness to participate in advance care planning: A qualitative study of renal failure patients, families and healthcare providers.

    PubMed

    Hutchison, Lauren A; Raffin-Bouchal, Donna S; Syme, Charlotte A; Biondo, Patricia D; Simon, Jessica E

    2017-09-01

    Objectives Advance care planning is the process by which people reflect upon their wishes and values for healthcare, discuss their choices with family and friends and document their wishes. Readiness represents a key predictor of advance care planning participation; however, the evidence for addressing readiness is scarce within the renal failure context. Our objectives were to assess readiness for advance care planning and barriers and facilitators to advance care planning uptake in a renal context. Methods Twenty-five participants (nine patients, nine clinicians and seven family members) were recruited from the Southern Alberta Renal Program. Semi-structured interviews were recorded, transcribed and then analyzed using interpretive description. Results Readiness for advance care planning was driven by individual values perceived by a collaborative encounter between clinicians and patients/families. If advance care planning is not valued, then patients/families and clinicians are not ready to initiate the process. Patients and clinicians are delaying conversations until "illness burden necessitates," so there is little "advance" care planning, only care planning in-the-moment closer to the end of life. Discussion The value of advance care planning in collaboration with clinicians, patients and their surrogates needs reframing as an ongoing process early in the patient's illness trajectory, distinguished from end-of-life decision making.

  6. Self-reported musculoskeletal complaints and injuries and exposure of physical workload in Swedish soldiers serving in Afghanistan

    PubMed Central

    Hagman, Ingela; Tegern, Matthias; Broman, Lisbet; Larsson, Helena

    2018-01-01

    Background Musculoskeletal complaints and injuries (MSCI) are common in military populations. However, only a limited number of studies have followed soldiers during international deployments and investigated the prevalence of MSCI during and at the end of their deployment. The aim was to describe the prevalence of MSCI in different military occupational specialties and categorise their most common tasks in terms of exposures to physical workloads during a six-month long international deployment in Afghanistan. Methods Cross-sectional survey, including 325 soldiers (300 men), aged 20–62 participating in an international deployment in Afghanistan during the spring of 2012. Soldiers were clustered into different military occupational specialties: Infantry, Administration, Logistics, Logistics/Camp, Medical and Other. Data were collected through the use of the Musculoskeletal Screening Protocol at the end of the international mission. Results Forty-seven percent reported MSCI during deployment, with 28% at the end. The most common locations of MSCI during the mission were lower back, knee, shoulders, upper back, neck and foot, while the knee and lower back prevailed at the end of the mission. Almost half of the soldiers who had MSCI reported affected work ability. The most common duties during the mission were vehicle patrolling, staff duties, guard/security duties, foot patrols and transportation. Soldiers reported that vehicle patrolling, staff duties and transportation were demanding with respect to endurance strength, guard/security duties challenged both maximum and endurance strength while foot patrolling challenged maximum and endurance strength, aerobic and anaerobic endurance and speed. Conclusions MSCI during international deployment are common among Swedish soldiers. The results indicate the need to further develop strategies focusing on matching the soldiers’ capacity to the job requirements, with relevant and fair physical selection-tests during the recruitment process and proactive interventions targeting MSCI before and during deployment, in order to enhance soldiers’ readiness and promote operational readiness. PMID:29621324

  7. DOD Financial Management: Improvements Needed in the Navys Audit Readiness Efforts for Fund Balance with Treasury

    DTIC Science & Technology

    2016-08-01

    prioritization of key information technology limits management’s ability to focus audit readiness efforts on the systems with the highest risk...corrective actions for the higher-risk systems first. For an audit readiness plan for key information technology systems, the Navy provided a schedule...prioritization of key information technology systems used in the FBWT process limits management’s ability to focus audit readiness efforts on the most

  8. Detection of braking intention in diverse situations during simulated driving based on EEG feature combination

    NASA Astrophysics Data System (ADS)

    Kim, Il-Hwa; Kim, Jeong-Woo; Haufe, Stefan; Lee, Seong-Whan

    2015-02-01

    Objective. We developed a simulated driving environment for studying neural correlates of emergency braking in diversified driving situations. We further investigated to what extent these neural correlates can be used to detect a participant's braking intention prior to the behavioral response. Approach. We measured electroencephalographic (EEG) and electromyographic signals during simulated driving. Fifteen participants drove a virtual vehicle and were exposed to several kinds of traffic situations in a simulator system, while EEG signals were measured. After that, we extracted characteristic features to categorize whether the driver intended to brake or not. Main results. Our system shows excellent detection performance in a broad range of possible emergency situations. In particular, we were able to distinguish three different kinds of emergency situations (sudden stop of a preceding vehicle, sudden cutting-in of a vehicle from the side and unexpected appearance of a pedestrian) from non-emergency (soft) braking situations, as well as from situations in which no braking was required, but the sensory stimulation was similar to stimulations inducing an emergency situation (e.g., the sudden stop of a vehicle on a neighboring lane). Significance. We proposed a novel feature combination comprising movement-related potentials such as the readiness potential, event-related desynchronization features besides the event-related potentials (ERP) features used in a previous study. The performance of predicting braking intention based on our proposed feature combination was superior compared to using only ERP features. Our study suggests that emergency situations are characterized by specific neural patterns of sensory perception and processing, as well as motor preparation and execution, which can be utilized by neurotechnology based braking assistance systems.

  9. The Development of the Ares I-X Flight Test

    NASA Technical Reports Server (NTRS)

    Ess, Robert H.

    2008-01-01

    The National Aeronautics and Space Administration (NASA) Constellation Program (CxP) has identified a series of tests to provide insight into the design and development of the Ares I Crew Launch Vehicle (CLV) and the Orion Crew Exploration Vehicle (CEV). Ares I-X was created as the first suborbital development flight test to help meet CxP objectives. The Ares I-X flight vehicle is an early operational model of Ares, with specific emphasis on Ares I and ground operation characteristics necessary to meet Ares I-X flight test objectives. Ares I-X will encompass the design and construction of an entire system that includes the Flight Test Vehicle (FTV) and associated operations. The FTV will be a test model based on the Ares I design. Select design features will be incorporated in the FTV design to emulate the operation of the CLV in order to meet the flight test objectives. The operations infrastructure and processes will be customized for Ares I-X, while still providing data to inform the developers of the launch processing system for Ares/Orion. The FTV is comprised of multiple elements and components that will be developed at different locations. The components will be delivered to the launch/assembly site, Kennedy Space Center (KSC), for assembly of the elements and components into an integrated, flight-ready, launch vehicle. The FTV will fly a prescribed trajectory in order to obtain the necessary data to meet the objectives. Ares I-X will not be commanded or controlled from the ground during flight, but the FTV will be equipped with telemetry systems, a data recording capability and a flight termination system (FTS). The in-flight part of the test includes a trajectory to simulate maximum dynamic pressure during flight and perform a stage separation representative of the CLV. The in-flight test also includes separation of the Upper Stage Simulator (USS) from the First Stage and recovery of the First Stage. The data retrieved from the flight test will be analyzed and used in the design and development of the Ares I vehicle. This paper will discuss the challenges in developing a new launch vehicle in a very short timeframe. The duration from formal Authority to Proceed to launch is 32 months with launch scheduled for April, 2009. The discussion will include changes to organizational structure, system engineering approaches, and early lessons learned for a fast tracked and highly visible project.

  10. EUV mask manufacturing readiness in the merchant mask industry

    NASA Astrophysics Data System (ADS)

    Green, Michael; Choi, Yohan; Ham, Young; Kamberian, Henry; Progler, Chris; Tseng, Shih-En; Chiou, Tsann-Bim; Miyazaki, Junji; Lammers, Ad; Chen, Alek

    2017-10-01

    As nodes progress into the 7nm and below regime, extreme ultraviolet lithography (EUVL) becomes critical for all industry participants interested in remaining at the leading edge. One key cost driver for EUV in the supply chain is the reflective EUV mask. As of today, the relatively few end users of EUV consist primarily of integrated device manufactures (IDMs) and foundries that have internal (captive) mask manufacturing capability. At the same time, strong and early participation in EUV by the merchant mask industry should bring value to these chip makers, aiding the wide-scale adoption of EUV in the future. For this, merchants need access to high quality, representative test vehicles to develop and validate their own processes. This business circumstance provides the motivation for merchants to form Joint Development Partnerships (JDPs) with IDMs, foundries, Original Equipment Manufacturers (OEMs) and other members of the EUV supplier ecosystem that leverage complementary strengths. In this paper, we will show how, through a collaborative supplier JDP model between a merchant and OEM, a novel, test chip driven strategy is applied to guide and validate mask level process development. We demonstrate how an EUV test vehicle (TV) is generated for mask process characterization in advance of receiving chip maker-specific designs. We utilize the TV to carry out mask process "stress testing" to define process boundary conditions which can be used to create Mask Rule Check (MRC) rules as well as serve as baseline conditions for future process improvement. We utilize Advanced Mask Characterization (AMC) techniques to understand process capability on designs of varying complexity that include EUV OPC models with and without sub-resolution assist features (SRAFs). Through these collaborations, we demonstrate ways to develop EUV processes and reduce implementation risks for eventual mass production. By reducing these risks, we hope to expand access to EUV mask capability for the broadest community possible as the technology is implemented first within and then beyond the initial early adopters.

  11. Research and Development of Zinc Air Fuel Cell To Achieve Commercialization Final Report CRADA No. TC-1544-98

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cooper, J. F.; Haley, H. D.

    The specific goal of this project was to advance the development of the zinc air fuel cell (ZAFC) towards commercial readiness in different mobile applications, including motor bikes, passenger cars, vans, buses and off-road vehicles (golf carts, factory equipment), and different stationary applications including generator sets, uninterruptible power systems and electric utility loading leveling and distributive power.

  12. Breaking Through (SLS Gets Fired Up With Rock Legends STYX's "Gone Gone Gone")

    NASA Image and Video Library

    2017-10-19

    Inspired by the music of STYX, NASA's Space Launch System is fired up and getting ready for the deep-space rocket's first flight. "Gone Gone Gone" is the debut single from STYX's Mars-inspired album, "The Mission." SLS, the world’s most powerful rocket, will send NASA’s Orion crew vehicle on bold missions beyond Earth’s orbit farther than humans have ever ventured before.

  13. Saturn Apollo Program

    NASA Image and Video Library

    1964-12-01

    The fuel tank assembly of the Saturn V S-IC (first) stage is readied to be mated to the liquid oxygen tank at the Marshall Space Flight Center. The fuel tank carried kerosene as its fuel. The S-IC stage utilized five F-1 engines that used kerosene and liquid oxygen as propellant. Each engine provided 1,500,000 pounds of thrust. This stage lifted the entire vehicle and Apollo spacecraft from the launch pad.

  14. J-2 Engine ready to go into test stand

    NASA Technical Reports Server (NTRS)

    1965-01-01

    Two technicians watch carefully as cables prepare to lift a J-2 engine into a test stand. The J-2 powered the second stage and the third stage of the Saturn V moon rocket. The towering 363-foot Saturn V was a multi-stage, multi-engine launch vehicle standing taller than the Statue of Liberty. Altogether, the Saturn V engines produced as much power as 85 Hoover Dams.

  15. Public health approaches to safer cycling for children based on developmental and physiological readiness: implications for practice

    PubMed Central

    Lenton, Simon; Finlay, Fiona Olwen

    2018-01-01

    Introduction Cyclists have a high mortality and morbidity per mile travelled compared with car occupants, a figure that is likely to increase if campaigns to increase active travel are successful. Concerns about safety is the leading factor limiting cycling for children. Objective This review brings together a paediatric perspective based on the developmental readiness of children and young people and a public health approach to reducing injuries, to produce a practical agenda for improving the safety of cycling for children. Method Selective literature review. Results While most sports realise the importance of practice and training to create mastery of the game, similar thinking has not been consistently applied to cycling proficiency, so many children do not have an opportunity to master cycling before riding on the roads. Conclusions The aim should be to minimise road traffic injuries involving children and young people in ways that create cobenefits for other members of society, increasing opportunities for active travel, reducing air pollution, creating more green space to play and reducing dependence on motor vehicles. Changes in legislation are required now to enable younger children to cycle on pavements while learning to ride and improvements in road design to separate cyclists from motor vehicles especially routes to school for older children. PMID:29637180

  16. A Mars/phobos Transportation System

    NASA Technical Reports Server (NTRS)

    1989-01-01

    A transportation system will be necessary to support construction and operation of bases on Phobos and Mars beginning in the year 2020 or later. An approach to defining a network of vehicles and the types of vehicles which may be used in the system are presented. The network will provide a convenient, integrated means for transporting robotically constructed bases to Phobos and Mars. All the technology needed for the current plan is expected to be available for use at the projected date of cargo departure from the Earth system. The modular design of the transportation system provides easily implemented contingency plans, so that difficulties with any one vehicle will have a minimal effect on the progress of the total mission. The transportation network proposed consists of orbital vehicles and atmospheric entry vehicles. Initially, only orbital vehicles will participate in the robotic construction phase of the Phobos base. The Interplanetary Transfer Vehicle (ITV) will carry the base and construction equipment to Phobos where the Orbital Maneuvering Vehicles (OMV's) will participate in the initial construction of the base. When the Mars base is ready to be sent, one or more ITV's will be used to transport the atmospheric entry vehicles from Earth. These atmospheric vehicles are the One Way Landers (OWL's) and the Ascent/Descent Vehicles (ADV's). They will be used to carry the base components and/or construction equipment. The OMV's and the Orbital Transfer Vehicles (OTV's) will assist in carrying the atmospheric entry vehicles to low Martian orbit where the OWL's or ADV's will descent to the planet surface. The ADV's were proposed to accommodate expansion of the system. Additionally, a smaller version of the ADV class is capable of transporting personnel between Mars and Phobos.

  17. Processed and ultra-processed food products: consumption trends in Canada from 1938 to 2011.

    PubMed

    Moubarac, Jean-Claude; Batal, Malek; Martins, Ana Paula Bortoletto; Claro, Rafael; Levy, Renata Bertazzi; Cannon, Geoffrey; Monteiro, Carlos

    2014-01-01

    A classification of foods based on the nature, extent, and purpose of industrial food processing was used to assess changes in household food expenditures and dietary energy availability between 1938 and 2011 in Canada. Food acquisitions from six household food budget surveys (1938/1939 , 1953, 1969, 1984, 2001, and 2011) were classified into unprocessed or minimally processed foods, processed culinary ingredients, and ready-to-consume processed or ultra-processed products. Contributions of each group to household food expenditures, and to dietary energy availability (kcal per capita) were calculated. During the period studied, household expenditures and dietary energy availability fell for both unprocessed or minimally processed foods and culinary ingredients, and rose for ready-to-consume products. The caloric share of foods fell from 34.3% to 25.6% and from 37% to 12.7% for culinary ingredients. The share of ready-to-consume products rose from 28.7% to 61.7%, and the increase was especially noteworthy for those that were ultra-processed. The most important factor that has driven changes in Canadian dietary patterns between 1938 and 2011 is the replacement of unprocessed or minimally processed foods and culinary ingredients used in the preparation of dishes and meals; these have been displaced by ready-to-consume ultra-processed products. Nutrition research and practice should incorporate information about food processing into dietary assessments.

  18. The Factor Structure of the Self-Directed Learning Readiness Scale (SDLRS).

    ERIC Educational Resources Information Center

    Wang, Xiaoping; And Others

    A study involving teachers and administrators from 16 elementary, middle, and high schools in Tennessee investigated the factorial structure of the Self-Directed Learning Readiness Scale (SDLRS). The SDLRS includes 58 Likert-like items designed to measure the readiness of adult learners to assume self-direction in the learning process. Study…

  19. Pedagogical Conditions of Ensuring Students' Readiness for Scientific Researches--Example of Technical University

    ERIC Educational Resources Information Center

    Slessarev, Yuri Vassilyevich; Moisseyev, Vassily Borisovich; Vostroknutov, Evgeniy Vladimirovich

    2015-01-01

    This article describes pedagogical conditions of ensuring students readiness for scientific researches on the basis of scientific literature and experience of Penza State Technological University students. Introduction of suggested conditions favors the process of training of highly skilled expert who is ready for generation of new ideas in fields…

  20. System analysis for technology transfer readiness assessment of horticultural postharvest

    NASA Astrophysics Data System (ADS)

    Hayuningtyas, M.; Djatna, T.

    2018-04-01

    Availability of postharvest technology is becoming abundant, but only a few technologies are applicable and useful to a wider community purposes. Based on this problem it requires a significant readiness level of transfer technology approach. This system is reliable to access readiness a technology with level, from 1-9 and to minimize time of transfer technology in every level, time required technology from the selection process can be minimum. Problem was solved by using Relief method to determine ranking by weighting feasible criteria on postharvest technology in each level and PERT (Program Evaluation Review Technique) to schedule. The results from ranking process of post-harvest technology in the field of horticulture is able to pass level 7. That, technology can be developed to increase into pilot scale and minimize time required for technological readiness on PERT with optimistic time of 7,9 years. Readiness level 9 shows that technology has been tested on the actual conditions also tied with estimated production price compared to competitors. This system can be used to determine readiness of technology innovation that is derived from agricultural raw materials and passes certain stages.

  1. Status of Sample Return Propulsion Technology Development Under NASA's ISPT Program

    NASA Technical Reports Server (NTRS)

    Anderson, David J.; Glaab, Louis J.; Munk, Michelle M.; Pencil, Eric; Dankanich, John; Peterson, Todd T.

    2012-01-01

    The In-Space Propulsion Technology (ISPT) program was tasked in 2009 to start development of propulsion technologies that would enable future sample return missions. ISPT s sample return technology development areas are diverse. Sample Return Propulsion (SRP) addresses electric propulsion for sample return and low cost Discovery-class missions, propulsion systems for Earth Return Vehicles (ERV) including transfer stages to the destination, and low technology readiness level (TRL) advanced propulsion technologies. The SRP effort continues work on HIVHAC thruster development to transition into developing a Hall-effect propulsion system for sample return (ERV and transfer stages) and low-cost missions. Previous work on the lightweight propellant-tanks continues for sample return with direct applicability to a Mars Sample Return (MSR) mission with general applicability to all future planetary spacecraft. The Earth Entry Vehicle (EEV) work focuses on building a fundamental base of multi-mission technologies for Earth Entry Vehicles (MMEEV). The main focus of the Planetary Ascent Vehicles (PAV) area is technology development for the Mars Ascent Vehicle (MAV), which builds upon and leverages the past MAV analysis and technology developments from the Mars Technology Program (MTP) and previous MSR studies

  2. Development and flight test of metal-lined CFRP cryogenic tank for reusable rocket

    NASA Astrophysics Data System (ADS)

    Higuchi, Ken; Takeuchi, Shinsuke; Sato, Eiichi; Naruo, Yoshihiro; Inatani, Yoshifumi; Namiki, Fumiharu; Tanaka, Kohtaro; Watabe, Yoko

    2005-07-01

    A cryogenic tank made of carbon fiber reinforced plastic (CFRP) shell with aluminum thin liner has been designed as a liquid hydrogen (LH2) tank for an ISAS reusable launch vehicle, and the function of it has been proven by repeated flights onboard the test vehicle called reusable vehicle testing (RVT) in October 2003. The liquid hydrogen tank has to be a pressure vessel, because the fuel of the engine of the test vehicle is supplied by fuel pressure. The pressure vessel of a combination of the outer shell of CFRP for strength element at a cryogenic temperature and the inner liner of aluminum for gas barrier has shown excellent weight merit for this purpose. Interfaces such as tank outline shape, bulk capacity, maximum expected operating pressure (MEOP), thermal insulation, pipe arrangement, and measurement of data are also designed to be ready onboard. This research has many aims, not only development of reusable cryogenic composite tank but also the demonstration of repeated operation including thermal cycle and stress cycle, familiarization with test techniques of operation of cryogenic composite tanks, and the accumulation of data for future design of tanks, vehicle structures, safety evaluation, and total operation systems.

  3. Risk Mitigation Approach to Commercial Resupply to the International Space Station

    NASA Technical Reports Server (NTRS)

    Koons, Diane S.; Schreiber, Craig

    2010-01-01

    In August 2006, NASA awarded Space Act Agreements (SAAs) for Commercial Orbital Transportation Services (COTS) under the Commercial Crew and Cargo Project Office at Johnson Space Center. One of the goals of the SAAs is to facilitate U.S. private industry demonstration of cargo transportation capabilities, ultimately achieving reliable, cost effective access to low-Earth orbit (LEO). Each COTS provider is required to complete International Space Stations (ISS) Integration activities, which includes meeting the physical and functional interfaces and interface requirements between the ISS and COTS vehicles. These requirements focus on the areas of risk to the ISS during rendezvous and proximity operations, as well as the integration operations while the COTS vehicle is berthed to the ISS. On December 23, 2008, NASA awarded Commercial Resupply Service (CRS) contracts to provide resupply services to the ISS, following the Shuttle retirement. In addition to performing any ISS Integration activities, NASA will be performing independent assessments of the launch vehicle and orbital vehicle to evaluate the readiness of the contractor to deliver NASA cargo safely to the ISS. This paper will address the activities NASA Centers, both JSC and KSC, in the oversight and insight function over commercial visiting vehicles to the ISS.

  4. Curing conditions to inactivate Trichinella spiralis muscle larvae in ready-to-eat pork sausage

    USDA-ARS?s Scientific Manuscript database

    Curing processes for ready to eat (RTE) pork products currently require individual validation of methods to demonstrate inactivation of Trichinella spiralis. This is a major undertaking for each process; currently no model of meat chemistry exists that can be correlated with inactivation of Trichin...

  5. NIITEK-NVESD AMDS program and interim field-ready system

    NASA Astrophysics Data System (ADS)

    Hibbard, Mark W.; Etebari, Ali

    2010-04-01

    NIITEK (Non-Intrusive Inspection Technology, Inc) develops and fields vehicle-mounted mine and buried threat detection systems. Since 2003, the NIITEK has developed and tested a remote robot-mounted mine detection system for use in the NVESD AMDS program. This paper will discuss the road map of development since the outset of the program, including transition from a data collection platform towards a militarized field-ready system for immediate use as a remote countermine and buried threat detection solution with real-time autonomous threat classification. The detection system payload has been integrated on both the iRobot Packbot and the Foster-Miller Talon robot. This brief will discuss the requirements for a successful near-term system, the progressive development of the system, our current real-time capabilities, and our planned upgrades for moving into and supporting field testing, evaluation, and ongoing operation.

  6. Automotive Stirling engine Market and Industrial Readiness Program (MIRP), phase 1

    NASA Astrophysics Data System (ADS)

    1982-05-01

    A program, begun in 1978, has the goal of transferring Stirling engine technology from United Stirling of Sweden to the US and, then, following design, fabrication, and prototype testing, to secure US manufacturers for the engine. The ultimate objective is the large-scale commercial use of the Automotive Stirling Engine (ASE) by the year 2000. The fist phase of the Market and Industrial Readiness Program for the ASE was concerned with defining the market, product, economic and technical factors necessary to be addressed to assure a reasonable chance of ultimate commercial acceptance. Program results for this first phase are reported and discussed. These results pertain to licensing strategy development, economic analysis, market factors, product planning, market growth, cost studies, and engine performance as measured by fuel economy using conventional fuels and by vehicle speed and acceleration characteristics.

  7. Rapid, Repeat-sample Monitoring of Crustal Deformations and Environmental Phenomena with the Uninhabited Aerial Vehicle Synthetic Aperture Radar

    NASA Technical Reports Server (NTRS)

    Smith, Robert C.

    2006-01-01

    The Uninhabited Aerial Vehicle Synthetic Aperture Radar (UAVSAR) is a precision repeat-pass Interferometric Synthetic Aperture Radar (InSAR) mission being developed by the Jet Propulsion Laboratory and the Dryden Flight Research Center in support of NASA s Science Mission Directorate. UAVSAR's unique ability to fly a repeatable flight path, along with an electronically steerable array, allows interferometric data to be obtained with accuracies measured in millimeters. Deploying the radar on an airborne platform will also allow for radar images to be collected and compared with images from the same area taken hours or even years later - providing for long-term trending and near real-time notification of changes and deformations. UAVSAR s data processing algorithms will provide for near-real time data reduction providing disaster planning and response teams with highly accurate data to aid in the prediction of, and response to, natural phenomena. UAVSAR data can be applied to increasing our understanding of the processes behind solid earth, cryosphere, carbon cycle and other areas of interest in earth science. Technologies developed for UAVSAR may also be applicable to a future earth-orbiting InSAR mission and possibly for missions to the Moon or Mars. The UAVSAR is expected to fly on a Gulfstream III aircraft this winter, followed by a flight test program lasting until the second half of 2007. Following radar calibration and data reduction activities, the platform will be ready for science users in the summer of 2008.

  8. An evaluation of negative-emission transportation-energy systems for the US

    NASA Astrophysics Data System (ADS)

    Larson, E. D.; Meerman, J. C.

    2017-12-01

    We present technical, economic, and carbon footprint evaluations of alternative technological pathways for negative emissions transportation energy from sustainably-sourced lignocellulosic biomass in the U.S. We combine the understanding of alternative technological pathways with spatially-resolved projections of the sustainable supply of lignocellulosic biomass and with future demands for transportation services to provide insights on the extent to which biomass-based energy might be able to help meet mid-century U.S. transportation energy needs and carbon mitigation targets. Biomass conversion routes included in our evaluations are biochemical, biocatalytic, thermocatalytic hydropyrolysis, and thermochemical gasification/synthesis to produce liquid fuels fungible with petroleum-derived fuels, and thermochemical conversion to hydrogen (for fuel cell vehicles) or electricity (for battery electric vehicles). Lifecycle net negative emissions are achieved for each system via soil carbon buildup during biomass production and/or capture of CO2 at the conversion facility and underground storage. Co-processing of some fossil fuel is considered in some cases to improve economics. For self-consistency in the analysis across systems, a common set of technical, economic and carbon footprint input parameters are adopted. Capital cost estimates are harmonized by taking into account scale of facilities, level of engineering details available in generating a cost estimate, and the technology readiness level (TRL) of components and the process as a whole. Implications for economics of future commercial plants are investigated, considering alternative prospective reductions in capital and operating costs (via "learning by doing") and alternative carbon mitigation policies.

  9. Readiness factors for information system strategic planning among universities in developing countries: a systematic review

    NASA Astrophysics Data System (ADS)

    Irfan, M.; Putra, S. J.; Alam, C. N.; Subiyakto, A.; Wahana, A.

    2018-03-01

    The implementation of information system strategic planning (ISSP) in higher education institutions is to improve work efficiency, management effectiveness in order to improve organizational competitive advantage. However, the question of whether all universities are ready to implement ISSP as a way to achieve organizational goals has not been answered. This study aims to investigate the readiness phenomena through literature study. The method used is by using the Systematic Literature Review (SLR) instrument to identify readiness factors on the implementation of ISSP, especially among the institutions of higher education in developing countries. This study has identified 10 readiness measurement. There are three categories of measurement, namely people, processes and technologies that represent 11 factors of ISSP readiness measurement in universities.

  10. Aft Skirt Electrical Umbilical (ASEU) and Vehicle Support Post (

    NASA Image and Video Library

    2016-12-09

    A view from underneath one of the vertical support posts for NASA's Space Launch System rocket. Two after skirt electrical umbilicals (ASEUs) and the first of the vertical support post were transported by flatbed truck from the Launch Equipment Test Facility to the Mobile Launcher Yard as NASA's Kennedy Space Center in Florida. The ASEUs and the VSP underwent a series of tests to confirm they are functioning properly and ready to support the SLS for launch. The ASEUs will connect to the SLS rocket at the bottom outer edge of each booster and provide electrical power and data connections to the rocket until it lifts off from the launch pad. The eight VSPs will support the load of the solid rocket boosters, with four posts for each of the boosters. The center’s Engineering Directorate and the Ground Systems Development and Operations Program are overseeing processing and testing of the umbilicals.

  11. Aft Skirt Electrical Umbilical (ASEU) and Vehicle Support Post (

    NASA Image and Video Library

    2016-12-09

    Construction workers assist as a crane is used to lower a vertical support post for NASA's Space Launch System (SLS) onto a platform at the Mobile Launcher Yard at NASA's Kennedy Space Center in Florida. Two ASEUs and the first of the vertical support posts underwent a series of tests at the Launch Equipment Test Facility to confirm they are functioning properly and ready to support the SLS for launch. The ASEUs will connect to the SLS rocket at the bottom outer edge of each booster and provide electrical power and data connections to the rocket until it lifts off from the launch pad. The eight VSPs will support the load of the solid rocket boosters, with four posts for each of the boosters. The center’s Engineering Directorate and the Ground Systems Development and Operations Program are overseeing processing and testing of the umbilicals.

  12. Orbital Sciences Pegasus XL AIM Processing

    NASA Image and Video Library

    2007-03-16

    Inside the clean-room "tent" of Building 1555 at North Vandenberg Air Force Base, a star tracker cover is ready for placement on the AIM spacecraft during testing of the solar array panel deployment. The AIM spacecraft will fly three instruments designed to study polar mesospheric clouds located at the edge of space, 50 miles above the Earth's surface in the coldest part of the planet's atmosphere. The mission's primary goal is to explain why these clouds form and what has caused them to become brighter and more numerous and appear at lower latitudes in recent years. AIM's results will provide the basis for the study of long-term variability in the mesospheric climate and its relationship to global climate change. AIM is scheduled to be mated to its launch vehicle, Orbital Sciences' Pegasus XL, during the second week of April, after which final inspections will be conducted. Launch is scheduled for April 25.

  13. Sources of Variability in Chlorophyll Analysis by Fluorometry and High-Performance Liquid Chromatography in a SIMBIOS Inter-Calibration Exercise

    NASA Technical Reports Server (NTRS)

    VanHeukelem, Laurie; Thomas, Crystal S.; Gilbert, Patricia M.; Fargion, Giulietta S. (Editor); McClain, Charles R. (Editor)

    2002-01-01

    The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project. This particular document focus on the variability in chlorophyll pigment measurements resulting from differences in methodologies and laboratories conducting the pigment analysis.

  14. Thermal imaging for assessment of electron-beam freeform fabrication (EBF3) additive manufacturing deposits

    NASA Astrophysics Data System (ADS)

    Zalameda, Joseph N.; Burke, Eric R.; Hafley, Robert A.; Taminger, Karen M.; Domack, Christopher S.; Brewer, Amy; Martin, Richard E.

    2013-05-01

    Additive manufacturing is a rapidly growing field where 3-dimensional parts can be produced layer by layer. NASA's electron beam freeform fabrication (EBF3) technology is being evaluated to manufacture metallic parts in a space environment. The benefits of EBF3 technology are weight savings to support space missions, rapid prototyping in a zero gravity environment, and improved vehicle readiness. The EBF3 system is composed of 3 main components: electron beam gun, multi-axis position system, and metallic wire feeder. The electron beam is used to melt the wire and the multi-axis positioning system is used to build the part layer by layer. To insure a quality deposit, a near infrared (NIR) camera is used to image the melt pool and solidification areas. This paper describes the calibration and application of a NIR camera for temperature measurement. In addition, image processing techniques are presented for deposit assessment metrics.

  15. KSC-2011-6400

    NASA Image and Video Library

    2011-08-11

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttles Discovery and Endeavour, their noses encased in protective plastic where their forward reaction control systems (FRCS) once resided, pause outside Orbiter Processing Facility-3 (OPF-3) for a unique photo opportunity. Discovery, which temporarily was being stored in the Vehicle Assembly Building (VAB), is switching places with Endeavour, which has been undergoing decommissioning in OPF-1. Discovery then will be rolled into OPF-1 and Endeavour into the VAB. In OPF-1, Discovery will undergo further preparations for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. Endeavour will be stored in the VAB until October when it will be moved into OPF-2 for further work to get it ready for public display at the California Science Center in Los Angeles. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Jim Grossmann

  16. KSC-2011-6381

    NASA Image and Video Library

    2011-08-11

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, operators begin to move space shuttle Endeavour, its nose encased in protective plastic where its forward reaction control system (FRCS) once resided, from Orbiter Processing Facility-1 (OPF-1) to the Vehicle Assembly Building (VAB). Endeavour is switching places with shuttle Discovery which temporarily has been stored in the VAB. Both shuttles will stop briefly outside OPF-3 for a "nose-to-nose" photo opportunity. Discovery then will be rolled into OPF-1 and Endeavour into the VAB. In OPF-1, Discovery will undergo further preparations for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. Endeavour will be stored in the VAB until October when it will be moved into OPF-2 for further work to get it ready for public display at the California Science Center in Los Angeles. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Jim Grossmann

  17. KSC-2011-6388

    NASA Image and Video Library

    2011-08-11

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Endeavour, its nose encased in protective plastic where its forward reaction control system (FRCS) once resided, backs out of Orbiter Processing Facility-1 (OPF-1) for its move to the Vehicle Assembly Building (VAB). Endeavour is switching places with shuttle Discovery which temporarily has been stored in the VAB. Both shuttles will stop briefly outside OPF-3 for a "nose-to-nose" photo opportunity. Discovery then will be rolled into OPF-1 and Endeavour into the VAB. In OPF-1, Discovery will undergo further preparations for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. Endeavour will be stored in the VAB until October when it will be moved into OPF-2 for further work to get it ready for public display at the California Science Center in Los Angeles. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Jim Grossmann

  18. MODIS Validation, Data Merger and Other Activities Accomplished by the SIMBIOS Project: 2002-2003

    NASA Technical Reports Server (NTRS)

    Fargion, Giulietta S.; McClain, Charles R.

    2003-01-01

    The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, satellite data processing, and data product validation. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report focuses on the SIMBIOS Project s efforts in support of the Moderate-Resolution Imaging Spectroradiometer (MODIS) on the Earth Observing System (EOS) Terra platform (similar evaluations of MODIS/Aqua are underway). This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project.

  19. The Viability of Readiness Assessment in Contributing to Improved Career Services: Response to Jepsen (2000).

    ERIC Educational Resources Information Center

    Sampson, James P., Jr.; Peterson, Gary W.; Reardon, Robert C.; Lenz, Janet G.

    2000-01-01

    Responds to Jepsen's (this issue [2000]) commentary on Sampson et al.'s theory-based approach to using readiness assessment to improve career services. Three topics are included: the reliability and utility of using readiness assessment measures; verbal ability and the use of cognitive information-processing theory in practice; and the potential…

  20. NASA Crew Launch Vehicle Flight Test Options

    NASA Technical Reports Server (NTRS)

    Cockrell, Charles E., Jr.; Davis, Stephan R.; Robonson, Kimberly; Tuma, Margaret L.; Sullivan, Greg

    2006-01-01

    Options for development flight testing (DFT) of the Ares I Crew Launch Vehicle (CLV) are discussed. The Ares-I Crew Launch Vehicle (CLV) is being developed by the U.S. National Aeronautics and Space Administration (NASA) to launch the Crew Exploration Vehicle (CEV) into low Earth Orbit (LEO). The Ares-I implements one of the components of the Vision for Space Exploration (VSE), providing crew and cargo access to the International Space Station (ISS) after retirement of the Space Shuttle and, eventually, forming part of the launch capability needed for lunar exploration. The role of development flight testing is to demonstrate key sub-systems, address key technical risks, and provide flight data to validate engineering models in representative flight environments. This is distinguished from certification flight testing, which is designed to formally validate system functionality and achieve flight readiness. Lessons learned from Saturn V, Space Shuttle, and other flight programs are examined along with key Ares-I technical risks in order to provide insight into possible development flight test strategies. A strategy for the first test flight of the Ares I, known as Ares I-1, is presented.

  1. Airborne rotary separator study

    NASA Astrophysics Data System (ADS)

    Drnevich, R. F.; Nowobilski, J. J.

    1992-12-01

    Several air breathing propulsion concepts for future earth-to-orbit transport vehicles utilize air collection and enrichment, and subsequent storage of liquid oxygen for later use in the vehicle mission. Work performed during the 1960's established the feasibility of substantially reducing weight and volume of a distillation type air separator system by operating the distillation elements in high 'g' fields obtained by rotating the separator assembly. The purpose of this study was to evaluate various fuels and fuel combinations with the objective of minimizing the weight and increase the ready alert capability of the plane. Fuels will be used to provide energy as well as act as heat sinks for the on-board heat rejection system. Fuel energy was used to provide power for air separation as well as to produce refrigeration for liquefaction of oxygen enriched air, besides its primary purpose of vehicle propulsion. The heat generated in the cycle was rejected to the fuel and water which is also carried on board the vehicle.The fuels that were evaluated include JP4, methane, and hydrogen. Hydrogen served as a comparison to the JP4 and methane cases.

  2. A Survey of Titan Balloon Concepts and Technology Status

    NASA Technical Reports Server (NTRS)

    Hall, Jeffery L.

    2011-01-01

    This paper surveys the options for, and technology status of, balloon vehicles to explore Saturn's moon Titan. A significant amount of Titan balloon concept thinking and technology development has been performed in recent years, particularly following the spectacular results from the descent and landing of the Huygens probe and remote sensing observations by the Cassini spacecraft. There is widespread recognition that a balloon vehicle on the next Titan mission could provide an outstanding and unmatched capability for in situ exploration on a global scale. The rich variety of revealed science targets has combined with a highly favorable Titan flight environment to yield a wide diversity of proposed balloon concepts. The paper presents a conceptual framework for thinking about balloon vehicle design choices and uses it to analyze various Titan options. The result is a list of recommended Titan balloon vehicle concepts that could perform a variety of science missions, along with their projected performance metrics. Recent technology developments for these balloon concepts are discussed to provide context for an assessment of outstanding risk areas and technological maturity. The paper concludes with suggestions for technology investments needed to achieve flight readiness.

  3. NASA's Space Launch System: Deep-Space Delivery for SmallSats

    NASA Technical Reports Server (NTRS)

    Robinson, Kimberly F.; Norris, George

    2017-01-01

    Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering more than 70 metric tons (t) to Low Earth Orbit (LEO). Planning is underway for smallsat accomodations on future configurations of the vehicle, which will present additional opportunities. This paper will include an overview of the SLS vehicle and its capabilities, including the current status of progress toward first launch. It will also explain the current and future opportunities the vehicle offers for small satellites, including an overview of the CubeSat manifest for Exploration Mission-1 in 2018 and a discussion of future capabilities.

  4. KSC-06pd1337

    NASA Image and Video Library

    2006-06-23

    KENNEDY SPACE CENTER, FLA. - Two bird detection radars have been set up near Launch Pad 39B to get ready for the July 1 launch of Space Shuttle Discovery on mission STS-121. When birds, especially vultures, are near the shuttle during a launch, impact on a critical area is possible and could cause catastrophic damage to the vehicle. Already proven affective for aviation where threats posed by bird strikes have been a problem, the avian radar, known as Aircraft Birdstrike Avoidance Radar, provides horizontal and vertical scanning and can monitor either launch pad for movement of vultures around them. If data relayed from the avian radar indicates large birds are dangerously close to the vehicle, controllers could hold the countdown. Photo credit: NASA/Dimitri Gerondidakis

  5. KSC-2009-2655

    NASA Image and Video Library

    2009-04-14

    CAPE CANAVERAL, Fla. – In high bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the crane raises the Ares I-X simulated launch abort system, or LAS, to a vertical position. The LAS will then be ready for assembly with the crew module simulator. Ares I-X is the flight test vehicle for the Ares I, which is part of the Constellation Program to return men to the moon and beyond. Ares I is the essential core of a safe, reliable, cost-effective space transportation system that eventually will carry crewed missions back to the moon, on to Mars and out into the solar system. Ares I-X is targeted for launch in July 2009. Photo credit: NASA/Jack Pfaller

  6. KSC-2009-2654

    NASA Image and Video Library

    2009-04-14

    CAPE CANAVERAL, Fla. – In high bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center in Florida, the crane begins to raise the Ares I-X simulated launch abort system, or LAS, to a vertical position. The LAS will then be ready for assembly with the crew module simulator. Ares I-X is the flight test vehicle for the Ares I, which is part of the Constellation Program to return men to the moon and beyond. Ares I is the essential core of a safe, reliable, cost-effective space transportation system that eventually will carry crewed missions back to the moon, on to Mars and out into the solar system. Ares I-X is targeted for launch in July 2009. Photo credit: NASA/Jack Pfaller

  7. In-Flight Suppression of a De-Stabilized F/A-18 Structural Mode Using the Space Launch System Adaptive Augmenting Control System

    NASA Technical Reports Server (NTRS)

    Wall, John; VanZwieten, Tannen; Giiligan Eric; Miller, Chris; Hanson, Curtis; Orr, Jeb

    2015-01-01

    Adaptive Augmenting Control (AAC) has been developed for NASA's Space Launch System (SLS) family of launch vehicles and implemented as a baseline part of its flight control system (FCS). To raise the technical readiness level of the SLS AAC algorithm, the Launch Vehicle Adaptive Control (LVAC) flight test program was conducted in which the SLS FCS prototype software was employed to control the pitch axis of Dryden's specially outfitted F/A-18, the Full Scale Advanced Systems Test Bed (FAST). This presentation focuses on a set of special test cases which demonstrate the successful mitigation of the unstable coupling of an F/A-18 airframe structural mode with the SLS FCS.

  8. Preliminary concepts for a solar electric orbit raising experiment

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Cohen, R.B.; Penn, J.P.; Janson, S.W.

    1989-01-01

    Some preliminary concepts for a solar electric orbit raising demonstration that will show technological readiness for the development of operational Electric Orbital Transfer Vehicles (EOTVs) are outlined. These ideas could serve as a template for the proposed Electric Insertion Transfer Experiment (ELITE). At this moment, ELITE is not a funded program. Concepts are presented for a solar electric orbit raising demonstration, for ELITE, and for the path from the proposed ELITE to a future operational EOTV. A brief discussion of the benefits to be derived from the use of EOTVs, the conceptual organization of the ELITE team, the key technologiesmore » for EOTV and ELITE, and some preliminary options for the orbit raising vehicle and representative missions are provided.« less

  9. KSC-03pd0994

    NASA Image and Video Library

    2003-04-07

    KENNEDY SPACE CENTER, FLA. - The Pegasus XL launch vehicle is ready for a re-mate with the Galaxy Evolution Explorer (GALEX) spacecraft. The March 26 launch was delayed to enable protective covers to be added to the Optical Wheel Assembly (OWA) on GALEX to avoid the possibility of a missing electrical cable fastener floating into and jamming the mechanism when GALEX is in orbit. Launch of GALEX is now scheduled for no earlier than April 26.

  10. Immersive virtual reality platform for medical training: a "killer-application".

    PubMed

    2000-01-01

    The Medical Readiness Trainer (MRT) integrates fully immersive Virtual Reality (VR), highly advanced medical simulation technologies, and medical data to enable unprecedented medical education and training. The flexibility offered by the MRT environment serves as a practical teaching tool today and in the near future the will serve as an ideal vehicle for facilitating the transition to the next level of medical practice, i.e., telepresence and next generation Internet-based collaborative learning.

  11. Saturn Apollo Program

    NASA Image and Video Library

    1960-01-01

    This photograph shows the Saturn V assembled LOX (Liquid Oxygen) and fuel tanks ready for transport from the Manufacturing Engineering Laboratory at Marshall Space Flight Center in Huntsville, Alabama. The tanks were then shipped to the launch site at Kennedy Space Center for a flight. The towering 363-foot Saturn V was a multi-stage, multi-engine launch vehicle standing taller than the Statue of Liberty. Altogether, the Saturn V engines produced as much power as 85 Hoover Dams.

  12. Enhancing Joint Warfighting Readiness Through Conduct of Foreign Disaster Relief Operations

    DTIC Science & Technology

    2014-03-26

    seas. USS Tortuga (LSD 46) loaded amphibious landing craft and departed its homeport of Sasebo, Japan, immediately after the tsunami on 11 March to...5. 32 53E helicopters from a detachment in Korea and proceed north to provide assistance. Once arriving in the disaster area, Tortuga loaded...Onimato and delivered the JGSDF personnel vehicles ashore by amphibious landing craft. Once the offload was complete, Tortuga remained on station as

  13. Improving media message interpretation processing skills to promote healthy decision making about substance use: the effects of the middle school media ready curriculum.

    PubMed

    Kupersmidt, Janis B; Scull, Tracy M; Benson, Jessica W

    2012-01-01

    The Media Ready Program was designed as a middle school, media literacy education, preventive intervention program to improve adolescents' media literacy skills and reduce their intention to use alcohol or tobacco products. In a short-term efficacy trial, schools in North Carolina were randomly assigned to conditions (Media Ready: n = 214; control: n = 198). Boys in the Media Ready group reported significantly less intention to use alcohol in the future than did boys in the control group. Also, students in the Media Ready group who had used tobacco in the past reported significantly less intention to use tobacco in the future than did students in the control group who had previously used tobacco. Multilevel multiple mediation analyses suggest that the set of logical analysis Message Interpretation Processing variables mediated the program's effect on students' intentions to use alcohol or tobacco in the future.

  14. Daily Readiness Huddles in Radiology-Improving Communication, Coordination, and Problem-Solving Reliability.

    PubMed

    Donnelly, Lane F

    Deploying an intentional daily management process is a key part to create high-reliability culture. Key components described in the literature for a successfully daily management process include leadership standard work, visual controls, daily accountability processes, and the discipline to stick to the process over the long term. We believe that the institution of a daily readiness huddle has helped us better coordinate and communicate as a department and improved our ability to deliver imaging services on a daily basis. The daily readiness huddle has enabled us to more rapidly identify issues and has brought accountability to seeing solutions to those issues brought to fruition. In addition, it has helped with team building, including between the radiologists and the nonphysician staff. Copyright © 2017 Elsevier Inc. All rights reserved.

  15. Test plan. GCPS task 7, subtask 7.1: IHM development

    NASA Technical Reports Server (NTRS)

    Greenberg, H. S.

    1994-01-01

    The overall objective of Task 7 is to identify cost-effective life cycle integrated health management (IHM) approaches for a reusable launch vehicle's primary structure. Acceptable IHM approaches must: eliminate and accommodate faults through robust designs, identify optimum inspection/maintenance periods, automate ground and on-board test and check-out, and accommodate and detect structural faults by providing wide and localized area sensor and test coverage as required. These requirements are elements of our targeted primary structure low cost operations approach using airline-like maintenance by exception philosophies. This development plan will follow an evolutionary path paving the way to the ultimate development of flight-quality production, operations, and vehicle systems. This effort will be focused on maturing the recommended sensor technologies required for localized and wide area health monitoring to a technology readiness level (TRL) of 6 and to establish flight ready system design requirements. The following is a brief list of IHM program objectives: design out faults by analyzing material properties, structural geometry, and load and environment variables and identify failure modes and damage tolerance requirements; design in system robustness while meeting performance objectives (weight limitations) of the reusable launch vehicle primary structure; establish structural integrity margins to preclude the need for test and checkout and predict optimum inspection/maintenance periods through life prediction analysis; identify optimum fault protection system concept definitions combining system robustness and integrity margins established above with cost effective health monitoring technologies; and use coupons, panels, and integrated full scale primary structure test articles to identify, evaluate, and characterize the preferred NDE/NDI/IHM sensor technologies that will be a part of the fault protection system.

  16. A practical implementation science heuristic for organizational readiness: R = MC2

    PubMed Central

    Cook, Brittany S.; Lamont, Andrea; Wandersman, Abraham; Castellow, Jennifer; Katz, Jason; Beidas, Rinad S.

    2015-01-01

    There are many challenges when an innovation (i.e., a program, process, or policy that is new to an organization) is actively introduced into an organization. One critical component for successful implementation is the organization’s readiness for the innovation. In this article, we propose a practical implementation science heuristic, abbreviated as R= MC2. We propose that organizational readiness involves: 1) the motivation to implement an innovation, 2) the general capacities of an organization, and 3) the innovation-specific capacities needed for a particular innovation. Each of these components can be assessed independently and be used formatively. The heuristic can be used by organizations to assess readiness to implement and by training and technical assistance providers to help build organizational readiness. We present an illustration of the heuristic by showing how behavioral health organizations differ in readiness to implement a peer specialist initiative. Implications for research and practice of organizational readiness are discussed. PMID:26668443

  17. Advanced Near Net Shape Technology

    NASA Technical Reports Server (NTRS)

    Vickers, John

    2015-01-01

    The objective of the Advanced Near Net Shape Technology (ANNST) project is to radically improve near net shape manufacturing methods from the current Technology/ Manufacturing Readiness Levels (TRL/MRL 3-4) to the point where they are viable candidates (TRL/ MRL-6) for shortening the time and cost for insertion of new aluminum alloys and revolutionary manufacturing methods into the development/improvement of space structures. Conventional cyrotank manufacturing processes require fabrication of multiple pieces welded together to form a complete tank. A variety of near net shape manufacturing processes has demonstrated excellent potential for enabling single-piece construction of components such as domes, barrels, and ring frames. Utilization of such processes can dramatically reduce the extent of welding and joining needed to construct cryogenic tanks and other aerospace structures. The specific focus of this project is to successfully mature the integrally stiffened cylinder (ISC) process in which a single-piece cylinder with integral stiffeners is formed in one spin/flow forming process. Structural launch vehicle components, like cryogenic fuel tanks (e.g., space shuttle external tank), are currently fabricated via multipiece assembly of parts produced through subtractive manufacturing techniques. Stiffened structural panels are heavily machined from thick plate, which results in excessive scrap rates. Multipiece construction requires welds to assemble the structure, which increases the risk for defects and catastrophic failures.

  18. Space Shuttle Systems Engineering Processes for Liftoff Debris Risk Mitigation

    NASA Technical Reports Server (NTRS)

    Mitchell, Michael; Riley, Christopher

    2011-01-01

    This slide presentation reviews the systems engineering process designed to reduce the risk from debris during Space Shuttle Launching. This process begins the day of launch from the tanking to the vehicle tower clearance. Other debris risks (i.e., Ascent, and micrometeoroid orbital debit) are mentioned) but are not the subject of this presentation. The Liftoff debris systems engineering process and an example of how it works are reviewed (i.e.,STS-119 revealed a bolt liberation trend on the Fixed Service Structure (FSS) 275 level elevator room). The process includes preparation of a Certification of Flight Readiness (CoFR) that includes (1) Lift-off debris from previous mission dispositioned, (2) Flight acceptance rationale has been provided for Lift-off debris sources/causes (3) Lift-off debris mission support documentation, processes and tools are in place for the up-coming mission. The process includes a liftoff debris data collection that occurs after each launch. This includes a post launch walkdown, that records each liftoff debris, and the entry of the debris into a database, it also includes a review of the imagery from the launch, and a review of the instrumentation data. There is also a review of the debris transport analysis process, that includes temporal and spatial framework and a computational fluid dynamics (CFD) analysis. which incorporates a debris transport analyses (DTA), debris materials and impact tests, and impact analyses.

  19. ATV Engineering Support Team Safety Console Preparation for the Johannes Kepler Mission

    NASA Astrophysics Data System (ADS)

    Chase, R.; Oliefka, L.

    2010-09-01

    This paper describes the improvements to be implemented in the Safety console position of the Engineering Support Team(EST) at the Automated Transfer Vehicle(ATV) Control Centre(ATV-CC) for the upcoming ATV Johannes Kepler mission. The ATV missions to the International Space Station are monitored and controlled from the ATV-CC in Toulouse, France. The commanding of ATV is performed by the Vehicle Engineering Team(VET) in the main control room under authority of the Flight Director. The EST performs a monitoring function in a room beside the main control room. One of the EST positions is the Safety console, which is staffed by safety engineers from ESA and the industrial prime contractor, Astrium. The function of the Safety console is to check whether the hazard controls are available throughout the mission as required by the Hazard Reports approved by the ISS Safety Review Panel. Safety console preparation activities were limited prior to the first ATV mission due to schedule constraints, and the safety engineers involved have been working to improve the readiness for ATV 2. The following steps have been taken or are in process, and will be described in this paper: • review of the implementation of Operations Control Agreement Documents(OCADs) that record the way operational hazard controls are performed to meet the needs of the Hazard Reports(typically in Flight Rules and Crew Procedures), • crosscheck of operational control needs and implementations with respect to ATV's first flight observations and post flight evaluations, with a view to identifying additional, obsolete or revised operational hazard controls, • participation in the Flight Rule review and update process carried out between missions, • participation in the assessment of anomalies observed during the first ATV mission, to ensure that any impacts are addressed in the ATV 2 safety documentation, • preparation of a Safety console handbook to provide lists of important safety aspects to be monitored at various stages of the mission, including links to relevant Hazard Reports, Flight Rules, and supporting documentation, • participation to training courses conducted in the frame of the ATV Training Academy(ATAC), and provision of courses related to safety for the other members of the VET and EST, • participation to simulations conducted at ATV-CC, including off-nominal cases. The result of these activities will be an improved level of readiness for the ATV 2 mission.

  20. Technology Readiness Level Guidebook

    DOT National Transportation Integrated Search

    2017-09-01

    This guidebook provides the necessary information for conducting a Technology Readiness Level (TRL) Assessment. TRL Assessments are a tool for determining the maturity of technologies and identifying next steps in the research process. This guidebook...

  1. KSC-2015-1089

    NASA Image and Video Library

    2015-01-12

    VANDENBERG AIR FORCE BASE, Calif. – In the Astrotech payload processing facility on Vandenberg Air Force Base in California, a technician ensures the transportation canister containing NASA's Soil Moisture Active Passive, or SMAP, spacecraft is ready for its move to the launch pad. SMAP will launch on a United Launch Alliance Delta II 7320 configuration vehicle featuring a United Launch Alliance first stage booster powered by an Aerojet Rocketdyne RS-27A main engine and three Alliant Techsystems, or ATK, strap-on solid rocket motors. Once on station in Earth orbit, SMAP will provide global measurements of soil moisture and its freeze/thaw state. These measurements will be used to enhance understanding of processes that link the water, energy and carbon cycles, and to extend the capabilities of weather and climate prediction models. SMAP data also will be used to quantify net carbon flux in boreal landscapes and to develop improved flood prediction and drought monitoring capabilities. Launch from Space Launch Complex 2 is targeted for Jan. 29. To learn more about SMAP, visit http://www.nasa.gov/smap. Photo credit: NASA/U.S. Air Force Photo Squadron

  2. What Makes Offenders with an Intellectual Disability Ready to Engage with Psychological Therapy? A Qualitative Study

    ERIC Educational Resources Information Center

    Breckon, Susan E.; Smith, Ian C.; Daiches, Anna

    2013-01-01

    Although there are established links between measures of readiness for psychological therapy in offenders and subsequent reduction in recidivism rates there has been a lack of theoretical research considering this process within the intellectual disability (ID) offender population. Grounded theory methodology was used to explore the process by…

  3. Vision readiness of the reserve forces of the U.S. Army.

    PubMed

    Weaver, J L; McAlister, W H

    2001-01-01

    In 1996 and 1997, the Army conducted an exercise to assess the ability to rapidly mobilize the reserve forces. In accordance with Army requirements, each soldier was evaluated to determine if he or she met vision and optical readiness standards. Of the 1,947 individuals processed through the optometry section, 40% met vision requirements without correction and 32% met vision requirements with their current spectacles. The remaining 28% required examination. A major impediment to processing reserve units for deployment is the lack of vision and optical readiness. In the mobilization for the Persian Gulf War, significant delays were incurred because of the time required to perform eye examinations and fabricate eyewear. However, as a result of this exercise, current prescriptions will be available in the event of mobilization. To ensure readiness, all units should perform such exercises periodically.

  4. The Daily Readiness Huddle: a process to rapidly identify issues and foster improvement through problem-solving accountability.

    PubMed

    Donnelly, Lane F; Cherian, Shirley S; Chua, Kimberly B; Thankachan, Sam; Millecker, Laura A; Koroll, Alex G; Bisset, George S

    2017-01-01

    Because of the increasing complexities of providing imaging for pediatric health care services, a more reliable process to manage the daily delivery of care is necessary. Objective We describe our Daily Readiness Huddle and the effects of the process on problem identification and improvement. Our Daily Readiness Huddle has four elements: metrics review, clinical volume review, daily readiness assessment, and problem accountability. It is attended by radiologists, directors, managers, front-line staff with concerns, representatives from support services (information technology [IT] and biomedical engineering [biomed]), and representatives who join the meeting in a virtual format from off-site locations. Data are visually displayed on erasable whiteboards. The daily readiness assessment uses queues to determine whether anyone has concerns or outlier data in regard to S-MESA (Safety, Methods, Equipment, Supplies or Associates). Through this assessment, problems are identified and categorized as quick hits (will be resolved in 24-48 h, not requiring project management) and complex issues. Complex issues are assigned an owner, quality coach and report-back date. Additionally, projects are defined as improvements that are often strategic, are anticipated to take more than 60 days, and do not necessarily arise out of identified issues during the Daily Readiness Huddle. We tracked and calculated the mean, median and range of days to resolution and completion for complex issues and for projects during the first full year of implementing this process. During the first 12 months, 91 complex issues were identified and resolved, 11 projects were in progress and 33 completed, with 23 other projects active or in planning. Time to resolution of complex issues (in days) was mean 37.5, median 34.0, and range 1-105. For projects, time to completion (in days) was mean 86.0, median 84.0, and range 5-280. The Daily Readiness Huddle process has given us a framework to rapidly identify issues, bring accountability to problem-solving, and foster improvement. It has also had a positive effect on team-building and coordination.

  5. When Failure Means Success: Accepting Risk in Aerospace Development

    NASA Technical Reports Server (NTRS)

    Dumbacher, Daniel L.; Singer, Christopher E.

    2009-01-01

    Over the last three decades, NASA has been diligent in qualifying systems for human space flight. As the Agency transitions from operating the Space Shuttle, its employees must learn to accept higher risk levels to generate the data needed to certify its next human space flight system. The Marshall Center s Engineering workforce is developing the Ares I crew launch vehicle and designing the Ares V cargo launch vehicle for safety, reliability, and cost-effective operations. This presentation will provide a risk retrospective, using first-hand examples from the Delta Clipper-Experimental Advanced (DC-XA) and the X-33 single-stage-to-orbit flight demonstrators, while looking ahead to the upcoming Ares I-X uncrewed test flight. The DC-XA was successfully flown twice in 26 hours, setting a new turnaround-time record. Later, one of its 3 landing gears did not deploy, it tipped over, and was destroyed. During structural testing, the X-33 s advanced composite tanks were unable to withstand the forces to which it was subjected and the project was later cancelled. These are examples of successful failures, as the data generated are captured in databases used by vehicle designers today. More recently, the Ares I-X flight readiness review process was streamlined in keeping with the mission's objectives, since human lives are not at stake, which reflects the beginning of a cultural change. Failures are acceptable during testing, as they provide the lessons that actually lead to mission success. These and other examples will stimulate the discussion of when to accept risk in aerospace projects.

  6. Cueing cognitive flexibility: Item-specific learning of switch readiness.

    PubMed

    Chiu, Yu-Chin; Egner, Tobias

    2017-12-01

    The rich behavioral repertoire of the human species derives from our ability to flexibly reconfigure processing strategies (task sets) in response to changing requirements. This updating of task sets is effortful, as reflected by longer response times when switching a task than repeating it (switch costs). However, some recent data suggest that switch costs can be reduced by cueing switch readiness bottom-up, by associating particular stimuli with frequent switch requirements. This type of "stimulus-control (S-C) learning" would be highly adaptive, as it combines the speed of automatic (bottom-up) processing with the flexibility and generalizability of controlled (top-down) processing. However, it is unclear whether S-C learning of switch readiness is truly possible, and what the underlying mechanisms are. Here we address these questions by pairing specific stimuli with a need to update task-sets either frequently or rarely. In all 3 experiments, we observe robust item-specific switch probability (ISSP) effects as revealed by smaller switch costs for frequent switch items than for rare switch items. By including a neutral condition, we also show that the ISSP effect is primarily driven by S-C learning reducing switch costs in frequent switch items. Furthermore, by employing 3 tasks in Experiment 3, we establish that the ISSP effect reflects an enhancement of general switch readiness, rather than of the readiness to switch to a specific alternate task. These results firmly establish that switch readiness is malleable by item-specific S-C learning processes, documenting that a generalizable state of cognitive flexibility can be primed by a bottom-up stimulus. (PsycINFO Database Record (c) 2017 APA, all rights reserved).

  7. NASA Development of Aerocapture Technologies

    NASA Technical Reports Server (NTRS)

    James, Bonnie; Munk, Michelle; Moon, Steve

    2003-01-01

    Aeroassist technology development is a vital part of the NASA ln-Space Propulsion Program (ISP), which is managed by the NASA Headquarters Office of Space Science, and implemented by the Marshall Space Flight Center in Huntsville, Alabama. Aeroassist is the general term given to various techniques to maneuver a space vehicle within an atmosphere, using aerodynamic forces in lieu of propulsive fuel. Within the ISP, the current aeroassist technology development focus is aerocapture. The objective of the ISP Aerocapture Technology Project (ATP) is to develop technologies that can enable and/or benefit NASA science missions by significantly reducing cost, mass, and/or travel times. To accomplish this objective, the ATP identifies and prioritizes the most promising technologies using systems analysis, technology advancement and peer review, coupled with NASA Headquarters Office of Space Science target requirements. Plans are focused on developing mid-Technology Readiness Level (TRL) technologies to TRL 6 (ready for technology demonstration in space).

  8. NASA Development of Aerocapture Technologies

    NASA Technical Reports Server (NTRS)

    James, Bonnie; Munk, Michelle; Moon, Steve

    2004-01-01

    Aeroassist technology development is a vital part of the NASA In-Space Propulsion Program (ISP), which is managed by the NASA Headquarters Office of Space Science, and implemented by the Marshall Space Flight Center in Huntsville, Alabama. Aeroassist is the general term given to various techniques to maneuver a space vehicle within an atmosphere, using aerodynamic forces in lieu of propulsive fuel. Within the ISP, the current aeroassist technology development focus is aerocapture. The objective of the ISP Aerocapture Technology Project (ATP) is to develop technologies that can enable and/or benefit NASA science missions by significantly reducing cost, mass, and/or travel times. To accomplish this objective, the ATP identifies and prioritizes the most promising technologies using systems analysis, technology advancement and peer review, coupled with NASA Headquarters Office of Space Science target requirements. Plans are focused on developing mid-Technology Readiness Level (TRL) technologies to TRL 6 (ready for technology demonstration in space).

  9. Earned Value Management Considering Technical Readiness Level and Its Application to New Space Launcher Program

    NASA Astrophysics Data System (ADS)

    Choi, Young-In; Ahn, Jaemyung

    2018-04-01

    Earned value management (EVM) is a methodology for monitoring and controlling the performance of a project based on a comparison between planned and actual cost/schedule. This study proposes a concept of hybrid earned value management (H-EVM) that integrates the traditional EVM metrics with information on the technology readiness level. The proposed concept can reflect the progress of a project in a sensitive way and provides short-term perspective complementary to the traditional EVM metrics. A two-dimensional visualization on the cost/schedule status of a project reflecting both of the traditional EVM (long-term perspective) and the proposed H-EVM (short-term perspective) indices is introduced. A case study on the management of a new space launch vehicle development program is conducted to demonstrate the effectiveness of the proposed H-EVM concept, associated metrics, and the visualization technique.

  10. Using Positive Behavior Support Procedures in Head Start Classrooms to Improve School Readiness: A Group Training and Behavioral Coaching Model

    ERIC Educational Resources Information Center

    Feil, Edward G.; Walker, Hill; Severson, Herbert; Golly, Annemieke; Seeley, John R.; Small, Jason W.

    2009-01-01

    Social-emotional competence is an important determinant of school readiness. School readiness, in turn, sets the stage for school success. There is clear longitudinal evidence that school success, attachment and bonding to the schooling process, and full engagement of schooling can, in combination, operate as a protective factor against a host of…

  11. "Change in Schools It's More Like Sort of Turning an Oil Tanker": Creating Readiness for Health Promoting Schools

    ERIC Educational Resources Information Center

    Gardner, Belinda; Ollis, Debbie

    2015-01-01

    Purpose: The purpose of this paper is to add to the evidence of best practice in the implementation of the Health Promoting Schools (HPS) framework by examining the process of creating readiness for change in a large international school in South-East Asia. Using a settings-based approach and guided by readiness for change theory the data…

  12. Analysis of a Proposal to Implement the Readiness Based Sparing Process in the Brazilian Navy

    DTIC Science & Technology

    2017-06-01

    determine inventory levels. This research investigates whether implementing the U.S. DOD readiness-based sparing (RBS) methodology could provide the...suggested by applying the methodology first for determining reparable spares initial provisioning. 14. SUBJECT TERMS reparable, system-approach...This research investigates whether implementing the U.S. DOD readiness-based sparing (RBS) methodology could provide the Brazilian Navy with greater

  13. Lightweighting Automotive Materials for Increased Fuel Efficiency and Delivering Advanced Modeling and Simulation Capabilities to U.S. Manufacturers

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Hale, Steve

    Abstract The National Center for Manufacturing Sciences (NCMS) worked with the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL), to bring together research and development (R&D) collaborations to develop and accelerate the knowledgebase and infrastructure for lightweighting materials and manufacturing processes for their use in structural and applications in the automotive sector. The purpose/importance of this DOE program: • 2016 CAFÉ standards. • Automotive industry technology that shall adopt the insertion of lightweighting material concepts towards manufacturing of production vehicles. • Development and manufacture of advanced research tools for modeling and simulation (M&S) applications to reduce manufacturing andmore » material costs. • U.S. competitiveness that will help drive the development and manufacture of the next generation of materials. NCMS established a focused portfolio of applied R&D projects utilizing lightweighting materials for manufacture into automotive structures and components. Areas that were targeted in this program: • Functionality of new lightweighting materials to meet present safety requirements. • Manufacturability using new lightweighting materials. • Cost reduction for the development and use of new lightweighting materials. The automotive industry’s future continuously evolves through innovation, and lightweight materials are key in achieving a new era of lighter, more efficient vehicles. Lightweight materials are among the technical advances needed to achieve fuel/energy efficiency and reduce carbon dioxide (CO2) emissions: • Establish design criteria methodology to identify the best materials for lightweighting. • Employ state-of-the-art design tools for optimum material development for their specific applications. • Match new manufacturing technology to production volume. • Address new process variability with new production-ready processes.« less

  14. A scalable, fully automated process for construction of sequence-ready human exome targeted capture libraries

    PubMed Central

    2011-01-01

    Genome targeting methods enable cost-effective capture of specific subsets of the genome for sequencing. We present here an automated, highly scalable method for carrying out the Solution Hybrid Selection capture approach that provides a dramatic increase in scale and throughput of sequence-ready libraries produced. Significant process improvements and a series of in-process quality control checkpoints are also added. These process improvements can also be used in a manual version of the protocol. PMID:21205303

  15. KSC-97PC870

    NASA Image and Video Library

    1997-05-30

    A Titan IVB core vehicle and its twin Solid Rocket Motor Upgrades (SRMUs) depart from the Solid Rocket Motor Assembly and Readiness Facility (SMARF), Cape Canaveral Air Station (CCAS), en route to Launch Complex 40. At the pad, the Centaur upper stage will be added and, eventually, the prime payload, the Cassini spacecraft. Cassini will explore the Saturnian system, including the planet’s rings and moon, Titan. Launch of the Cassini mission to Saturn is scheduled for Oct. 6 from Pad 40, CCAS

  16. KSC-07pd1315

    NASA Image and Video Library

    2007-05-28

    KENNEDY SPACE CENTER, FLA. -- In the mobile service tower on Launch Pad 17-B at Cape Canaveral Air Force Station, the Delta II first stage is ready to receive the upper stages and solid rocket boosters for launch. The rocket is the launch vehicle for the Dawn spacecraft, targeted for liftoff on June 30. Dawn's mission is to explore two of the asteroid belt's most intriguing and dissimilar occupants: asteroid Vesta and the dwarf planet Ceres. Photo credit: NASA/Amanda Diller

  17. View of the Endeavour moving towards it launch pad

    NASA Image and Video Library

    1996-06-06

    STS077-S-044 (16 April 1996) --- The Space Shuttle Endeavour atop the Mobile Launcher Platform and Crawler-Transporter (MLP/CT) slowly lumbers past a tree alongside the crawlerway, at the Kennedy Space Center (KSC). The journey from the Vehicle Assembly Building (VAB) to Launch Pad 39B will take about five to six hours to complete. Once hard down at the pad, preparations will continue to ready Endeavour for its upcoming spaceflight on STS-77.

  18. KSC-01pp1061

    NASA Image and Video Library

    2001-06-02

    KENNEDY SPACE CENTER, Fla. -- An L-1011 aircraft called the Stargazer gets ready to land at the Skid Strip, Cape Canaveral Air Force Station. Underneath its belly it carries the Orbital Sciences Corp. Pegasus XL launch vehicle with the High Energy Solar Spectroscopic Imager (HESSI) attached. The Pegasus XL will launch the HESSI no earlier than June 12 from CCAFS. The primary mission of HESSI is to explore the basic physics of particle acceleration and energy release in solar flares

  19. Autonomy and manual operation in a small robotic system for under-vehicle inspections at security checkpoints

    NASA Astrophysics Data System (ADS)

    Smuda, William; Muench, Paul L.; Gerhart, Grant R.; Moore, Kevin L.

    2002-07-01

    Unmanned ground vehicle (UGV) technology can be used in a number of ways to assist in counter-terrorism activities. In addition to the conventional uses of tele-operated robots for unexploded ordinance handling and disposal, water cannons and other crowd control devices, robots can also be employed for a host of terrorism deterrence and detection applications. In previous research USU developed a completely autonomous prototype robot for performing under- vehicle inspections in parking areas (ODIS). Testing of this prototype and discussions with the user community indicated that neither the technology nor the users are ready for complete autonomy. In this paper we present a robotic system based on ODIS that balances the users' desire/need for tele- operation with a limited level of autonomy that enhances the performance of the robot. The system can be used by both civilian law enforcement and military police to replace the traditional mirror on a stick system of looking under cars for bombs and contraband.

  20. Defense Inventory: DOD Needs Additional Information for Managing War Reserve Levels of Meals Ready to Eat

    DTIC Science & Technology

    2015-05-01

    to provide operational ration manufacturers with two types of machines to assist with the cooking and filling and sealing process for operational...and (3) any strategies DLA pursues to balance cost with readiness in supplying WRM. GAO obtained information from the services on their processes ...for identifying WRM requirements, reviewed DLA’s inventory-management processes and related guidance, and interviewed DLA and military service

  1. Feds fail to obey own laws for electric vehicles says report

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    NONE

    Federal and state agencies have failed miserably in adding electric vehicles (EVs) to their fleets. That`s according to a report on the state of battery-powered autos in the October issue of Design News. Of about 585,000 vehicles in the federal fleet, only about 200 are electric. The 1992 Energy Policy Act (EPACT) called for federal fleets to boost their percentage of alternate fuel vehicles (though not necessarily EVs). The Big Three automakers say they invested heavily in EV technology in the belief that such regulations would spur federal agencies to buy their early vehicles. The US government says it can`tmore » afford electric cars. According to Denise Lenar of Government Services Administration Fleet Management, the cost differential between an electric and a convention is $22,000. Despite more than four decades of development effort the EVs most critical component -- the battery -- is nowhere near ready. The basic battery problem is simply one of weight versus power. Today, automakers pay exorbitant sums for EV batteries. Experts think that near-term, the hybrid electric vehicle could serve as a bridge technology, enabling battery developers to continue research, while greatly improving the environment. Hybrids use an internal combustion engine to charge the batteries for an electronic drivetrain, and provide more of the conveniences to which consumers have grown accustomed. Yet, hybrids, which burn gasoline, don`t qualify as zero emission vehicles under government rules.« less

  2. ZEBRA battery meets USABC goals

    NASA Astrophysics Data System (ADS)

    Dustmann, Cord-H.

    In 1990, the California Air Resources Board has established a mandate to introduce electric vehicles in order to improve air quality in Los Angeles and other capitals. The United States Advanced Battery Consortium has been formed by the big car companies, Electric Power Research Institute (EPRI) and the Department of Energy in order to establish the requirements on EV-batteries and to support battery development. The ZEBRA battery system is a candidate to power future electric vehicles. Not only because its energy density is three-fold that of lead acid batteries (50% more than NiMH) but also because of all the other EV requirements such as power density, no maintenance, summer and winter operation, safety, failure tolerance and low cost potential are fulfilled. The electrode material is plain salt and nickel in combination with a ceramic electrolyte. The cell voltage is 2.58 V and the capacity of a standard cell is 32 Ah. Some hundred cells are connected in series and parallel to form a battery with about 300 V OCV. The battery system including battery controller, main circuit-breaker and cooling system is engineered for vehicle integration and ready to be mounted in a vehicle [J. Gaub, A. van Zyl, Mercedes-Benz Electric Vehicles with ZEBRA Batteries, EVS-14, Orlando, FL, Dec. 1997]. The background of these features are described.

  3. Around Marshall

    NASA Image and Video Library

    2003-04-11

    Students from across the United States and as far away as Puerto Rico came to Huntsville, Alabama for the 10th annual Great Moonbuggy Race at the U.S. Space Rocket Center. Sixty-eight teams, representing high schools and colleges from all over the United States, and Puerto Rico, raced human powered vehicles over a lunar-like terrain. Vehicles powered by two team members, one male and one female, raced one at a time over a half-mile obstacle course of simulated moonscape terrain. The competition is inspired by development, some 30 years ago, of the Lunar Roving Vehicle (LRV), a program managed by the Marshall Space Flight Center. The LRV team had to design a compact, lightweight, all-terrain vehicle that could be transported to the Moon in the small Apollo spacecraft. The Great Moonbuggy Race challenges students to design and build a human powered vehicle so they will learn how to deal with real-world engineering problems similar to those faced by the actual NASA LRV team. In this photograph, racers from C-1 High School in Lafayette County, Missouri, get ready to tackle the course. The team pedaled its way to victory over 29 other teams to take first place honors. It was the second year in a row a team from the school has placed first in the high school division. (NASA/MSFC)

  4. 25. Paper ready for the calender presses. This picture shows ...

    Library of Congress Historic Buildings Survey, Historic Engineering Record, Historic Landscapes Survey

    25. Paper ready for the calender presses. This picture shows the paper after it has been coated and dried, as shown on page 238, and it being rolled at the end of the coating-machine. It is now ready to be sent to the big presses which calender it (or iron it, as popular pariance would have it). The pictures on pages 238 and 239 show a continuous process over a single machine; but on account of the length of teh machine, the process is illustrated in sections. (p.239.) - Champion-International Paper Company, West bank of Spicket River at Canal Street, Lawrence, Essex County, MA

  5. New Suborbital Flight Opportunities and Funding

    NASA Astrophysics Data System (ADS)

    Saltman, Alexander

    2013-07-01

    New opportunities for suborbital research are on the horizon. Reusable suborbital vehicles will offer immediate and routine space access for scientific payloads, provide access to altitudes around 100 kilometers, create opportunities for low-cost monitoring of upper atmospheric phenomena, as well as small scale solar observation. Reduced operational cost and quick turn-around will enable equipment to be flown opportunistically, in response to specific solar activity, or in continuous test and improvement cycles. Suborbital test flights will also provide opportunities to test prospective satellite instruments in an extended microgravity environment before being launched to orbit, raising the technology readiness level (TRL) of flight hardware and reducing the risk of anomalies during missions. I discuss the capabilities of emerging suborbital vehicles, payload and integration requirements, and funding opportunities for suborbital flights at NASA.

  6. Structures and Materials Technologies for Extreme Environments Applied to Reusable Launch Vehicles

    NASA Technical Reports Server (NTRS)

    Scotti, Stephen J.; Clay, Christopher; Rezin, Marc

    2003-01-01

    This paper provides an overview of the evolution of structures and materials technology approaches to survive the challenging extreme environments encountered by earth-to-orbit space transportation systems, with emphasis on more recent developments in the USA. The evolution of technology requirements and experience in the various approaches to meeting these requirements has significantly influenced the technology approaches. While previous goals were primarily performance driven, more recently dramatic improvements in costs/operations and in safety have been paramount goals. Technologies that focus on the cost/operations and safety goals in the area of hot structures and thermal protection systems for reusable launch vehicles are presented. Assessments of the potential ability of the various technologies to satisfy the technology requirements, and their current technology readiness status are also presented.

  7. A Horizontal Take-off and Landing satellite launcher or aerospace plane (HOTOL)

    NASA Astrophysics Data System (ADS)

    Conchie, P. J.

    1985-09-01

    An assessment is made of the technology readiness and typical mission profile of a Horizontal Takeoof and Landing (HOTOL) single-stage satellite launch vehicle for 1990s deployment. HOTOL would employ H2-fueled air-breathing propulsion for the first stage of its ascent to low earth orbit through the lower portions of the atmosphere; it would then switch to H2-fueled rocket engines using liquid oxygen from internal tanks for exoatmospheric flight and orbit insertion. Mission cost comparisons are made with alternative launch vehicle design options. HOTOL is approximately the same size as the Concorde SST, and will weigh so much less than the current Space Shuttle as to significantly reduce reentry speeds and temperatures, obviating ceramic insulation systems for the primary structure.

  8. The Second Stage of a Saturn V Ready For Test

    NASA Technical Reports Server (NTRS)

    1970-01-01

    This Saturn V S-II (second) stage is being lifted into position for a test at the Vehicle Assembly Building at the Kennedy Space Center. When the Saturn V booster stage (S-IC) burned out and dropped away, power for the Saturn was provided by the 82-foot-long and 33-foot-diameter S-II stage. Developed by the Space Division of North American Aviation under the direction of the Marshall Space Flight Center, the stage utilized five J-2 engines, each producing 200,000 pounds of thrust. The engines used liquid oxygen and liquid hydrogen as propellants. The towering 363-foot Saturn V was a multi-stage, multi-engine launch vehicle standing taller than the Statue of Liberty. Altogether, the Saturn V engines produced as much power as 85 Hoover Dams.

  9. KSC-07pd2836

    NASA Image and Video Library

    2007-10-11

    KENNEDY SPACE CENTER, FLA. -- In the Vehicle Assembly Building at NASA's Kennedy Space Center, the frustum is ready to be lifted from a transporter to move onto a stand. The solid rocket booster segment will be added to the stack for space shuttle Atlantis, launch vehicle for mission STS-122 targeted for a December launch. Atlantis will be carrying the Columbus Laboratory, Europe’s largest contribution to the construction of the International Space Station. It will support scientific and technological research in a microgravity environment. Columbus, a program of ESA, is a multifunctional, pressurized laboratory that will be permanently attached to Node 2 of the space station to carry out experiments in materials science, fluid physics and biosciences, as well as to perform a number of technological applications. Photo credit: NASA/Jack Pfaller

  10. Predictive Power of Attention and Reading Readiness Variables on Auditory Reasoning and Processing Skills of Six-Year-Old Children

    ERIC Educational Resources Information Center

    Erbay, Filiz

    2013-01-01

    The aim of present research was to describe the relation of six-year-old children's attention and reading readiness skills (general knowledge, word comprehension, sentences, and matching) with their auditory reasoning and processing skills. This was a quantitative study based on scanning model. Research sampling consisted of 204 kindergarten…

  11. High microbial loads found in minimally-processed sliced mushrooms from Italian market.

    PubMed

    Jiang, Haiyang; Miraglia, Dino; Ranucci, David; Donnini, Domizia; Roila, Rossana; Branciari, Raffaella; Li, Cheng

    2018-03-31

    There is an increased consumer interest in minimally processed vegetables that has led to the development of products, such as pre-cut sliced mushrooms. Few data are available on the hygienic condition and the presence of foodborne pathogens in such products. Therefore, the current study aimed to evaluate the safety and hygienic characteristics of both ready-to-eat and ready-to-cook, pre-cut sliced mushrooms obtained from a local Italian market. For the evaluation of the hygienic condition, the aerobic mesophilic bacteria, aerobic psychrotrophic bacteria and Escherichia coli enumerations were performed. Salmonella spp., Listeria monocytogenes and Campylobacter spp. were considered in the assessment of the foodborne pathogens. High microbial loads were detected, including counts higher than 5 log CFU/g for E. coli and 6 log CFU/g for the other bacteria counts considered, but no pathogens were found. Ready-to-eat and ready-to-cook products differed only for aerobic mesophilic counts (7.87 and 8.26 log CFU/g, respectively, P=0.003). Strategies to enhance the hygienic level of the mushrooms, particularly the ready-to-eat products, are needed.

  12. High microbial loads found in minimally-processed sliced mushrooms from Italian market

    PubMed Central

    Jiang, Haiyang; Miraglia, Dino; Ranucci, David; Donnini, Domizia; Roila, Rossana; Branciari, Raffaella; Li, Cheng

    2018-01-01

    There is an increased consumer interest in minimally processed vegetables that has led to the development of products, such as pre-cut sliced mushrooms. Few data are available on the hygienic condition and the presence of foodborne pathogens in such products. Therefore, the current study aimed to evaluate the safety and hygienic characteristics of both ready-to-eat and ready-to-cook, pre-cut sliced mushrooms obtained from a local Italian market. For the evaluation of the hygienic condition, the aerobic mesophilic bacteria, aerobic psychrotrophic bacteria and Escherichia coli enumerations were performed. Salmonella spp., Listeria monocytogenes and Campylobacter spp. were considered in the assessment of the foodborne pathogens. High microbial loads were detected, including counts higher than 5 log CFU/g for E. coli and 6 log CFU/g for the other bacteria counts considered, but no pathogens were found. Ready-to-eat and ready-to-cook products differed only for aerobic mesophilic counts (7.87 and 8.26 log CFU/g, respectively, P=0.003). Strategies to enhance the hygienic level of the mushrooms, particularly the ready-to-eat products, are needed. PMID:29732334

  13. Multiple Payload Ejector for Education, Science and Technology Experiments

    NASA Technical Reports Server (NTRS)

    Lechworth, Gary

    2005-01-01

    The education research community no longer has a means of being manifested on Space Shuttle flights, and small orbital payload carriers must be flown as secondary payloads on ELV flights, as their launch schedule, secondary payload volume and mass permits. This has resulted in a backlog of small payloads, schedule and cost problems, and an inability for the small payloads community to achieve routine, low-cost access to orbit. This paper will discuss Goddard's Wallops Flight Facility funded effort to leverage its core competencies in small payloads, sounding rockets, balloons and range services to develop a low cost, multiple payload ejector (MPE) carrier for orbital experiments. The goal of the MPE is to provide a low-cost carrier intended primarily for educational flight research experiments. MPE can also be used by academia and industry for science, technology development and Exploration experiments. The MPE carrier will take advantage of the DARPAI NASA partnership to perform flight testing of DARPA s Falcon small, demonstration launch vehicle. The Falcon is similar to MPE fiom the standpoint of focusing on a low-cost, responsive system. Therefore, MPE and Falcon complement each other for the desired long-term goal of providing the small payloads community with a low-cost ride to orbit. The readiness dates of Falcon and MPE are complementary, also. MPE is being developed and readied for flight within 18 months by a small design team. Currently, MPE is preparing for Critical Design Review in fall 2005, payloads are being manifested on the first mission, and the carrier will be ready for flight on the first Falcon demonstration flight in summer, 2006. The MPE and attached experiments can weigh up to 900 lb. to be compatible with Falcon demonstration vehicle lift capabilities fiom Wallops, and will be delivered to the Falcon demonstration orbit - 100 nautical mile circular altitude.

  14. An Investigation to Advance the Technology Readiness Level of the Centaur Derived On-orbit Propellant Storage and Transfer System

    NASA Astrophysics Data System (ADS)

    Silvernail, Nathan L.

    This research was carried out in collaboration with the United Launch Alliance (ULA), to advance an innovative Centaur-based on-orbit propellant storage and transfer system that takes advantage of rotational settling to simplify Fluid Management (FM), specifically enabling settled fluid transfer between two tanks and settled pressure control. This research consists of two specific objectives: (1) technique and process validation and (2) computational model development. In order to raise the Technology Readiness Level (TRL) of this technology, the corresponding FM techniques and processes must be validated in a series of experimental tests, including: laboratory/ground testing, microgravity flight testing, suborbital flight testing, and orbital testing. Researchers from Embry-Riddle Aeronautical University (ERAU) have joined with the Massachusetts Institute of Technology (MIT) Synchronized Position Hold Engage and Reorient Experimental Satellites (SPHERES) team to develop a prototype FM system for operations aboard the International Space Station (ISS). Testing of the integrated system in a representative environment will raise the FM system to TRL 6. The tests will demonstrate the FM system and provide unique data pertaining to the vehicle's rotational dynamics while undergoing fluid transfer operations. These data sets provide insight into the behavior and physical tendencies of the on-orbit refueling system. Furthermore, they provide a baseline for comparison against the data produced by various computational models; thus verifying the accuracy of the models output and validating the modeling approach. Once these preliminary models have been validated, the parameters defined by them will provide the basis of development for accurate simulations of full scale, on-orbit systems. The completion of this project and the models being developed will accelerate the commercialization of on-orbit propellant storage and transfer technologies as well as all in-space technologies that utilize or will utilize similar FM techniques and processes.

  15. Management Advisory on Deployment Readiness Review - Federal Aviation Administration

    DOT National Transportation Integrated Search

    1997-12-08

    This management advisory discusses the best practices identified during our review of the Federal Aviation Administration's (FAA) Deployment Readiness Review (DRR) process which should be adopted and strengthened as part of FAA's new Acquisition Mana...

  16. Readiness Review of BWXT for Fabrication of AGR 5/6/7 Compacts

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Marshall, Douglas William; Sharp, Michelle Tracy

    In support of preparations for fabricating compacts for the Advanced Gas Reactor (AGR) fuel qualification irradiation experiments (AGR-5/6/7), Idaho National Laboratory (INL) conducted a readiness review of the BWX Technology (BWXT) procedures, processes, and equipment associated with compact fabrication activities at the BWXT Nuclear Operations Group (BWXT-NOG) facility outside Lynchburg, VirginiaVA. The readiness review used quality assurance requirements taken from the American Society of Mechanical Engineers (ASME) Nuclear Quality Assurance Standard (NQA-1-2008/1a-2009) as a basis to assess readiness to start compact fabrication.

  17. Prevalence and level of Listeria monocytogenes and other Listeria sp. in ready-to-eat minimally processed and refrigerated vegetables.

    PubMed

    Kovačević, Mira; Burazin, Jelena; Pavlović, Hrvoje; Kopjar, Mirela; Piližota, Vlasta

    2013-04-01

    Minimally processed and refrigerated vegetables can be contaminated with Listeria species bacteria including Listeria monocytogenes due to extensive handling during processing or by cross contamination from the processing environment. The objective of this study was to examine the microbiological quality of ready-to-eat minimally processed and refrigerated vegetables from supermarkets in Osijek, Croatia. 100 samples of ready-to-eat vegetables collected from different supermarkets in Osijek, Croatia, were analyzed for presence of Listeria species and Listeria monocytogenes. The collected samples were cut iceberg lettuces (24 samples), other leafy vegetables (11 samples), delicatessen salads (23 samples), cabbage salads (19 samples), salads from mixed (17 samples) and root vegetables (6 samples). Listeria species was found in 20 samples (20 %) and Listeria monocytogenes was detected in only 1 sample (1 %) of cut red cabbage (less than 100 CFU/g). According to Croatian and EU microbiological criteria these results are satisfactory. However, the presence of Listeria species and Listeria monocytogenes indicates poor hygiene quality. The study showed that these products are often improperly labeled, since 24 % of analyzed samples lacked information about shelf life, and 60 % of samples lacked information about storage conditions. With regard to these facts, cold chain abruption with extended use after expiration date is a probable scenario. Therefore, the microbiological risk for consumers of ready-to-eat minimally processed and refrigerated vegetables is not completely eliminated.

  18. Propulsion Integrated Vehicle Health Management Technology Experiment (PITEX) Conducted

    NASA Technical Reports Server (NTRS)

    Maul, William A.; Chicatelli, Amy K.; Fulton, Christopher E.

    2004-01-01

    The Propulsion Integrated Vehicle Health Management (IVHM) Technology Experiment (PITEX) is a continuing NASA effort being conducted cooperatively by the NASA Glenn Research Center, the NASA Ames Research Center, and the NASA Kennedy Space Center. It was a key element of a Space Launch Initiative risk-reduction task performed by the Northrop Grumman Corporation in El Segundo, California. PITEX's main objectives are the continued maturation of diagnostic technologies that are relevant to second generation reusable launch vehicle (RLV) subsystems and the assessment of the real-time performance of the PITEX diagnostic solution. The PITEX effort has considerable legacy in the NASA IVHM Technology Experiment for X-vehicles (NITEX) that was selected to fly on the X-34 subscale RLV that was being developed by Orbital Sciences Corporation. NITEX, funded through the Future-X Program Office, was to advance the technology-readiness level of selected IVHM technologies within a flight environment and to begin the transition of these technologies from experimental status into RLV baseline designs. The experiment was to perform realtime fault detection and isolation and suggest potential recovery actions for the X-34 main propulsion system (MPS) during all mission phases by using a combination of system-level analysis and detailed diagnostic algorithms.

  19. Plug-In Hybrid Medium-Duty Truck Demonstration and Evaluation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Miyasato, Matt; Kosowski, Mark

    2015-10-01

    The Plug-In Hybrid Medium-Duty Truck Demonstration and Evaluation Program was sponsored by the United States Department of Energy (DOE) using American Recovery and Reinvestment Act of 2009 (ARRA) funding. The purpose of the program is to develop a path to migrate plug-in hybrid electric vehicle (PHEV) technology to medium-duty vehicles by demonstrating and evaluating vehicles in diverse applications. The program also provided three production-ready PHEV systems—Odyne Systems, Inc. (Odyne) Class 6 to 8 trucks, VIA Motors, Inc. (VIA) half-ton pickup trucks, and VIA three-quarter-ton vans. The vehicles were designed, developed, validated, produced, and deployed. Data were gathered and tests weremore » run to understand the performance improvements, allow cost reductions, and provide future design changes. A smart charging system was developed and produced during the program. The partnerships for funding included the DOE; the California Energy Commission (CEC); the South Coast Air Quality Management District (SCAQMD); the Electric Power Research Institute (EPRI); Odyne; VIA; Southern California Edison; and utility and municipal industry participants. The reference project numbers are DOE FOA-28 award number EE0002549 and SCAQMD contract number 10659.« less

  20. Simulation of Liquid Injection Thrust Vector Control for Mars Ascent Vehicle

    NASA Technical Reports Server (NTRS)

    Gudenkauf, Jared

    2017-01-01

    The Jet Propulsion Laboratory is currently in the initial design phase for a potential Mars Ascent Vehicle; which will be landed on Mars, stay on the surface for period of time, collect samples from the Mars 2020 rover, and then lift these samples into orbit around Mars. The engineers at JPL have down selected to a hybrid wax-based fuel rocket using a liquid oxidizer based on nitrogen tetroxide, or a Mixed Oxide of Nitrogen. To lower the gross lift-off mass of the vehicle the thrust vector control system will use liquid injection of the oxidizer to deflect the thrust of the main nozzle instead of using a gimbaled nozzle. The disadvantage of going with the liquid injection system is the low technology readiness level with a hybrid rocket. Presented in this paper is an effort to simulate the Mars Ascent Vehicle hybrid rocket nozzle and liquid injection thrust vector control system using the computational fluid dynamic flow solver Loci/Chem. This effort also includes determining the sensitivity of the thrust vector control system to a number of different design variables for the injection ports; including axial location, number of adjacent ports, injection angle, and distance between the ports.

  1. DOE Office of Scientific and Technical Information (OSTI.GOV)

    Aytug, Tolga

    Maintaining clarity and avoiding the accumulation of water and dirt on optically transparent surfaces such as US military vehicle windshields, viewports, periscope optical head windows, and electronic equipment cover glasses are critical to providing a high level of visibility, improved survivability, and much-needed safety for warfighters in the field. Through a combination of physical vapor deposition techniques and the exploitation of metastable phase separation in low-alkali borosilicate, a novel technology was developed for the fabrication of optically transparent, porous nanostructured silica thin film coatings that are strongly bonded to glass platforms. The nanotextured films, initially structurally superhydrophilic, exhibit superior superhydrophobicity,more » hence antisoiling ability, following a simple but robust modification in surface chemistry. The surfaces yield water droplet contact angles as high as 172°. Moreover, the nanostructured nature of these coatings provides increased light scattering in the UV regime and reduced reflectivity (i.e., enhanced transmission) over a broad range of the visible spectrum. In addition to these functionalities, the coatings exhibit superior mechanical resistance to abrasion and are thermally stable to temperatures approaching 500°C. The overall process technology relies on industry standard equipment and inherently scalable manufacturing processes and demands only nontoxic, naturally abundant, and inexpensive base materials. Such coatings, applied to the optical components of current and future combat equipment and military vehicles will provide a significant strategic advantage for warfighters. The inherent self-cleaning properties of such superhydrophobic coatings will also mitigate biofouling of optical windows exposed to high-humidity conditions and can help decrease repair/replacement costs, reduce maintenance, and increase readiness by limiting equipment downtime.« less

  2. Endeavour, Orbiter Vehicle (OV) 105, roll out to KSC Launch Complex Pad 39B

    NASA Image and Video Library

    1992-03-13

    S92-34862 (13 March 1992) --- An otter, surprised by the unexpected presence of the photographer, seems unaware of the Space Shuttle Endeavour rolling behind it to Launch Pad 39B. Endeavour is the newest orbiter in the Shuttle fleet. Still ahead for Endeavour (OV-105) is a Flight Readiness Firing of its three main engines, and the Terminal Countdown Demonstration Test with the flight crew. Endeavour's maiden voyage on NASA's mission STS-49 will occur in late spring.

  3. NASA's B-52B launch aircraft takes off carrying the third X-43A hypersonic research vehicle on a captive carry evaluation flight September 27, 2004

    NASA Image and Video Library

    2004-09-27

    Attached to the same B-52B mothership that once launched X-15 research aircraft in the 1960s, NASA's third X-43A performed a captive carry evaluation flight from Edwards Air Force Base, California on September 27, 2004. The X-43 remained mated to the B-52 throughout this mission, intended to check its readiness for launch scheduled later in the fall.

  4. iss047e114046

    NASA Image and Video Library

    2016-05-11

    ISS047e114046 (05/11/2016) --- The SpaceX Dragon is seen ready to be released from the International Space Station for its journey back to the Earth. The vehicle was ultimately released by Expedition 47 robotic arm operator Tim Peake of ESA (European Space Agency) on May 11, 2016. Dragon returned to Earth carrying more than 3,700 pounds of NASA cargo and science samples from human research, biology and biotechnology studies, physical science investigations and education activities sponsored by NASA and the U.S. national laboratory.

  5. Technology Innovations from NASA's Next Generation Launch Technology Program

    NASA Technical Reports Server (NTRS)

    Cook, Stephen A.; Morris, Charles E. K., Jr.; Tyson, Richard W.

    2004-01-01

    NASA's Next Generation Launch Technology Program has been on the cutting edge of technology, improving the safety, affordability, and reliability of future space-launch-transportation systems. The array of projects focused on propulsion, airframe, and other vehicle systems. Achievements range from building miniature fuel/oxygen sensors to hot-firings of major rocket-engine systems as well as extreme thermo-mechanical testing of large-scale structures. Results to date have significantly advanced technology readiness for future space-launch systems using either airbreathing or rocket propulsion.

  6. X-33

    NASA Image and Video Library

    2004-04-15

    Pictured here is an artist's concept of the experimental X-33 in-flight. The X-33 program was designed to pave the way to a full-scale commercially developed, reusable launch vehicle (RLV). The program that will put the U.S. on a path toward safe, affordable, reliable access to space by providing the latest technology was ready for space flight. The X-33 is the flagship technology demonstrator for technologies that will dramatically lower the cost of access to space. The X-33 program was cancelled in 2001.

  7. Orion EFT-1 Heat Shield Move from LASF to VAB Highbay 2

    NASA Image and Video Library

    2017-04-26

    Inside the Launch Abort System Facility at NASA's Kennedy Space Center in Florida, the Orion heat shield from Exploration Flight Test-1 is secured on a transporter and ready for its move to the Vehicle Assembly Building (VAB). The heat shield is being transferred from the Orion Program to the Ground Systems Development and Operations Program, Landing and Recovery Operations. In the VAB, the heat shield will be integrated with the Orion ground test article and used for future underway recovery testing.

  8. Saturn Apollo Program

    NASA Image and Video Library

    1964-12-01

    The fuel tank assembly of the Saturn V S-IC (first) stage supported with the aid of a C frame on the transporter was readied to be transported to the Marshall Space Flight Center, building 4705. The fuel tank carried kerosene (RP-1) as its fuel. The S-IC stage utilized five F-1 engines that used kerosene and liquid oxygen as propellant and each engine provided 1,500,000 pounds of thrust. This stage lifted the entire vehicle and Apollo spacecraft from the launch pad.

  9. Saturn V First Stage S-1C LOX Fuel Tanks

    NASA Technical Reports Server (NTRS)

    1960-01-01

    This photograph shows the Saturn V assembled LOX (Liquid Oxygen) and fuel tanks ready for transport from the Manufacturing Engineering Laboratory at Marshall Space Flight Center in Huntsville, Alabama. The tanks were then shipped to the launch site at Kennedy Space Center for a flight. The towering 363-foot Saturn V was a multi-stage, multi-engine launch vehicle standing taller than the Statue of Liberty. Altogether, the Saturn V engines produced as much power as 85 Hoover Dams.

  10. Test Plans. Lightweight Durable TPS: Tasks 1,2,4,5, and 6

    NASA Technical Reports Server (NTRS)

    Greenberg, H. S.; Tu, Tina

    1994-01-01

    The objective of this task is to develop the fluted core flexible blankets, also referred to as the Tailorable Advanced Blanket Insulation (TABI), to a technology readiness level (TRL) of 6. This task is one of the six tasks under TA 3, Lightweight Durable TPS study, of the Single Stage to Orbit (SSTO) program. The purpose of this task is to develop a durable and low maintenance flexible TPS blanket material to be implemented on the SSTO vehicle.

  11. Really Writing! Ready-To-Use Writing Process Activities for the Elementary Grades. 2nd Edition

    ERIC Educational Resources Information Center

    Sunflower, Cherlyn

    2005-01-01

    The second edition of "Really Writing!" provides 40 real-life writing activities designed to capture the attention of young authors (grades 2 through 6) who are just learning the composing process. This book is also a resource for teaching advanced writers who are ready to experiment with a variety of writing and speaking genres. Each of the…

  12. GROVER: An autonomous vehicle for ice sheet research

    NASA Astrophysics Data System (ADS)

    Trisca, G. O.; Robertson, M. E.; Marshall, H.; Koenig, L.; Comberiate, M. A.

    2013-12-01

    The Goddard Remotely Operated Vehicle for Exploration and Research or Greenland Rover (GROVER) is a science enabling autonomous robot specifically designed to carry a low-power, large bandwidth radar for snow accumulation mapping over the Greenland Ice Sheet. This new and evolving technology enables reduced cost and increased safety for polar research. GROVER was field tested at Summit, Greenland in May 2013. The robot traveled over 30 km and was controlled both by line of sight wireless and completely autonomously with commands and telemetry via the Iridium Satellite Network, from Summit as well as remotely from Boise, Idaho. Here we describe GROVER's unique abilities and design. The software stack features a modular design that can be adapted for any application that requires autonomous behavior, reliable communications using different technologies and low level control of peripherals. The modules are built to communicate using the publisher-subscriber design pattern to maximize data-reuse and allow for graceful failures at the software level, along with the ability to be loaded or unloaded on-the-fly, enabling the software to adopt different behaviors based on power constraints or specific processing needs. These modules can also be loaded or unloaded remotely for servicing and telemetry can be configured to contain any kind of information being generated by the sensors or scientific instruments. The hardware design protects the electronic components and the control system can change functional parameters based on sensor input. Power failure modes built into the hardware prevent the vehicle from running out of energy permanently by monitoring voltage levels and triggering software reboots when the levels match pre-established conditions. This guarantees that the control software will be operational as soon as there is enough charge to sustain it, giving the vehicle increased longevity in case of a temporary power loss. GROVER demonstrates that autonomous rovers can be a revolutionary tool for data collection, and that both the technology and the software are available and ready to be implemented to create scientific data collection platforms.

  13. Partnership readiness for community-based participatory research

    PubMed Central

    Andrews, Jeannette O.; Newman, Susan D.; Meadows, Otha; Cox, Melissa J.; Bunting, Shelia

    2012-01-01

    The use of a dyadic lens to assess and leverage academic and community partners’ readiness to conduct community-based participatory research (CBPR) has not been systematically investigated. With a lack of readiness to conduct CBPR, the partnership and its products are vulnerable. The purpose of this qualitative study was to explore the dimensions and key indicators necessary for academic and community partnership readiness to conduct CBPR. Key informant interviews and focus groups (n = 36 participants) were conducted with academic and community participants who had experiences with CBPR partnerships. A ‘framework analysis' approach was used to analyze the data and generate a new model, CBPR Partnership Readiness Model. Antecedents of CBPR partnership readiness are a catalyst and mutual interest. The major dimensions of the CBPR Partnership Readiness Model are (i) goodness of fit, (ii) capacity, and (iii) operations. Preferred outcomes are sustainable partnership and product, mutual growth, policy and social and health impact on the community. CBPR partnership readiness is an iterative and dynamic process, partnership and issue specific, influenced by a range of environmental and contextual factors, amenable to change and essential for sustainability and promotion of health and social change in the community. PMID:20837654

  14. Making Technology Ready: Integrated Systems Health Management

    NASA Technical Reports Server (NTRS)

    Malin, Jane T.; Oliver, Patrick J.

    2007-01-01

    This paper identifies work needed by developers to make integrated system health management (ISHM) technology ready and by programs to make mission infrastructure ready for this technology. This paper examines perceptions of ISHM technologies and experience in legacy programs. Study methods included literature review and interviews with representatives of stakeholder groups. Recommendations address 1) development of ISHM technology, 2) development of ISHM engineering processes and methods, and 3) program organization and infrastructure for ISHM technology evolution, infusion and migration.

  15. Spatial multibody modeling and vehicle dynamics analysis of advanced vehicle technologies

    NASA Astrophysics Data System (ADS)

    Letherwood, Michael D.; Gunter, David D.; Gorsich, David J.; Udvare, Thomas B.

    2004-08-01

    The US Army vision, announced in October of 1999, encompasses people, readiness, and transformation. The goal of the Army vision is to transition the entire Army into a force that is strategically responsive and dominant at every point of the spectrum of operations. The transformation component will be accomplished in three ways: the Objective Force, the Legacy (current) Force, and the Interim Force. The objective force is not platform driven, but rather the focus is on achieving capabilities that will operate as a "system of systems." As part of the Objective Force, the US Army plans to begin production of the Future Combat System (FCS) in FY08 and field the first unit by FY10 as currently defined in the FCS solicitation(1). As part of the FCS program, the Future Tactical Truck System (FTTS) encompasses all US Army tactical wheeled vehicles and its initial efforts will focus only on the heavy class. The National Automotive Center (NAC) is using modeling and simulation to demonstrate the feasibility and operational potential of advanced commercial and military technologies with application to new and existing tactical vehicles and to describe potential future vehicle capabilities. This document will present the results of computer-based, vehicle dynamics performance assessments of FTTS concepts with such features as hybrid power sources, active suspensions, skid steering, and in-hub electric drive motors. Fully three-dimensional FTTS models are being created using commercially available modeling and simulation methodologies such as ADAMS and DADS and limited vehicle dynamics validation studies are will be performed.

  16. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Certa, P.J.

    1998-01-07

    Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technical Baselines, work breakdown structures, tank farms organizational structure and configurations,more » work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  17. Apollo experience report the command and service module milestone review process

    NASA Technical Reports Server (NTRS)

    Brendle, H. L.; York, J. A.

    1974-01-01

    The sequence of the command and service module milestone review process is given, and the Customer Acceptance Readiness Review and Flight Readiness Review plans are presented. Contents of the System Summary Acceptance Documents for the two formal spacecraft reviews are detailed, and supplemental data required for presentation to the review boards are listed. Typical forms, correspondence, supporting documentation, and minutes of a board meeting are included.

  18. Low Density Supersonic Decelerator Flight Dynamics Test-1 Flight Design and Targeting

    NASA Technical Reports Server (NTRS)

    Ivanov, Mark

    2015-01-01

    NASA's Low Density Supersonic Decelerator (LDSD) program was established to identify, develop, and eventually qualify to Test [i.e. Technology] Readiness Level (TRL) - 6 aerodynamic decelerators for eventual use on Mars. Through comprehensive Mars application studies, two distinct Supersonic Inflatable Aerodynamic Decelerator (SIAD) designs were chosen that afforded the optimum balance of benefit, cost, and development risk. In addition, a Supersonic Disk Sail (SSDS) parachute design was chosen that satisfied the same criteria. The final phase of the multi-tiered qualification process involves Earth Supersonic Flight Dynamics Tests (SFDTs) within environmental conditions similar to those that would be experienced during a Mars Entry, Descent, and Landing (EDL) mission. The first of these flight tests (i.e. SFDT-1) was completed on June 28, 2014 with two more tests scheduled for the summer of 2015 and 2016, respectively. The basic flight design for all the SFDT flights is for the SFDT test vehicle to be ferried to a float altitude of 120 kilo-feet by a 34 thousand cubic feet (Mcf) heavy lift helium balloon. Once float altitude is reached, the test vehicle is released from the balloon, spun-up for stability, and accelerated to supersonic speeds using a Star48 solid rocket motor. After burnout of the Star48 motor the vehicle decelerates to pre-flight selected test conditions for the deployment of the SIAD system. After further deceleration with the SIAD deployed, the SSDS parachute is then deployed stressing the performance of the parachute in the wake of the SIAD augmented blunt body. The test vehicle/SIAD/parachute system then descends to splashdown in the Pacific Ocean for eventual recovery. This paper will discuss the development of both the test vehicle and the trajectory sequence including design trade-offs resulting from the interaction of both engineering efforts. In addition, the SFDT-1 nominal trajectory design and associated sensitivities will be discussed as well as an overview of the on-board flight software used to trigger and sequence the main flight events necessary to deploy the deceleration technologies. Finally, as-flown performance of the SFDT-1 system will be discussed.

  19. U.S. Department of Energy Zero Energy Ready Home Implementation

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    VonThoma, E.; Mosiman, G.

    This report documents the process and outcomes involved in achieving the U.S. Department of Energy Zero Energy Ready Home (ZERH) program certification standards while helping homebuilders in Climate Zones 5 and 6 in the Upper Midwest achieve ZERH certification.

  20. A multichannel model-based methodology for extubation readiness decision of patients on weaning trials.

    PubMed

    Casaseca-de-la-Higuera, Pablo; Simmross-Wattenberg, Federico; Martín-Fernández, Marcos; Alberola-López, Carlos

    2009-07-01

    Discontinuation of mechanical ventilation is a challenging task that involves a number of subtle clinical issues. The gradual removal of the respiratory support (referred to as weaning) should be performed as soon as autonomous respiration can be sustained. However, the prediction rate of successful extubation is still below 25% based on previous studies. Construction of an automatic system that provides information on extubation readiness is thus desirable. Recent works have demonstrated that the breathing pattern variability is a useful extubation readiness indicator, with improving performance when multiple respiratory signals are jointly processed. However, the existing methods for predictor extraction present several drawbacks when length-limited time series are to be processed in heterogeneous groups of patients. In this paper, we propose a model-based methodology for automatic readiness prediction. It is intended to deal with multichannel, nonstationary, short records of the breathing pattern. Results on experimental data yield an 87.27% of successful readiness prediction, which is in line with the best figures reported in the literature. A comparative analysis shows that our methodology overcomes the shortcomings of so far proposed methods when applied to length-limited records on heterogeneous groups of patients.

  1. The development of an online decision support tool for organizational readiness for change.

    PubMed

    Khan, Sobia; Timmings, Caitlyn; Moore, Julia E; Marquez, Christine; Pyka, Kasha; Gheihman, Galina; Straus, Sharon E

    2014-05-10

    Much importance has been placed on assessing readiness for change as one of the earliest steps of implementation, but measuring it can be a complex and daunting task. Organizations and individuals struggle with how to reliably and accurately measure readiness for change. Several measures have been developed to help organizations assess readiness, but these are often underused due to the difficulty of selecting the right measure. In response to this challenge, we will develop and test a prototype of a decision support tool that is designed to guide individuals interested in implementation in the selection of an appropriate readiness assessment measure for their setting. A multi-phase approach will be used to develop the decision support tool. First, we will identify key measures for assessing organizational readiness for change from a recently completed systematic review. Included measures will be those developed for healthcare settings (e.g., acute care, public health, mental health) and that have been deemed valid and reliable. Second, study investigators and field experts will engage in a mapping exercise to categorize individual items of included measures according to key readiness constructs from an existing framework. Third, a stakeholder panel will be recruited and consulted to determine the feasibility and relevance of the selected measures using a modified Delphi process. Fourth, findings from the mapping exercise and stakeholder consultation will inform the development of a decision support tool that will guide users in appropriately selecting change readiness measures. Fifth, the tool will undergo usability testing. Our proposed decision support tool will address current challenges in the field of organizational change readiness by aiding individuals in selecting a valid and reliable assessment measure that is relevant to user needs and practice settings. We anticipate that implementers and researchers who use our tool will be more likely to conduct readiness for change assessments in their settings when planning for implementation. This, in turn, may contribute to more successful implementation outcomes. We will test this tool in a future study to determine its efficacy and impact on implementation processes.

  2. Design verification and fabrication of active control systems for the DAST ARW-2 high aspect ratio wing, part 1

    NASA Technical Reports Server (NTRS)

    Mcgehee, C. R.

    1986-01-01

    A study was conducted under Drones for Aerodynamic and Structural Testing (DAST) program to accomplish the final design and hardware fabrication for four active control systems compatible with and ready for installation in the NASA Aeroelastic Research Wing No. 2 (ARW-2) and Firebee II drone flight test vehicle. The wing structure was designed so that Active Control Systems (ACS) are required in the normal flight envelope by integrating control system design with aerodynamics and structure technologies. The DAST ARW-2 configuration uses flutter suppression, relaxed static stability, and gust and maneuver load alleviation ACS systems, and an automatic flight control system. Performance goals and criteria were applied to individual systems and the systems collectively to assure that vehicle stability margins, flutter margins, flying qualities and load reductions are achieved.

  3. Guidance, navigation, and control trades for an Electric Orbit Transfer Vehicle

    NASA Astrophysics Data System (ADS)

    Zondervan, K. P.; Bauer, T. A.; Jenkin, A. B.; Metzler, R. A.; Shieh, R. A.

    The USAF Space Division initiated the Electric Insertion Transfer Experiment (ELITE) in the fall of 1988. The ELITE space mission is planned for the mid 1990s and will demonstrate technological readiness for the development of operational solar-powered electric orbit transfer vehicles (EOTVs). To minimize the cost of ground operations, autonomous flight is desirable. Thus, the guidance, navigation, and control (GNC) functions of an EOTV should reside on board. In order to define GNC requirements for ELITE, parametric trades must be performed for an operational solar-powered EOTV so that a clearer understanding of the performance aspects is obtained. Parametric trades for the GNC subsystems have provided insight into the relationship between pointing accuracy, transfer time, and propellant utilization. Additional trades need to be performed, taking into account weight, cost, and degree of autonomy.

  4. KSC-04pd2115

    NASA Image and Video Library

    2004-10-08

    KENNEDY SPACE CENTER, FLA. - At Launch Pad 17-A on Cape Canaveral Air Force Station, the second stage of the Boeing Delta II launch vehicle is ready to be lifted up the mobile service tower for mating with the first stage. The rocket is the launch vehicle for the Swift spacecraft and its Gamma-Ray Burst Mission, now scheduled for liftoff Nov. 8. Swift is a medium-class Explorer mission managed by NASA’s Goddard Space Flight Center in Greenbelt, Md. It is a first-of-its-kind multi-wavelength observatory dedicated to the study of gamma-ray burst (GRB) science. Its three instruments will work together to observe GRBs and afterglows in the gamma ray, X-ray, ultraviolet and optical wavebands. KSC is responsible for Swift’s integration with the Boeing Delta II rocket and the countdown management on launch day.

  5. Human Factors in the Design of the Crew Exploration Vehicle (CEV)

    NASA Technical Reports Server (NTRS)

    Whitmore, Mihriban; Byrne, Vicky; Holden, Kritina

    2007-01-01

    NASA s Space Exploration vision for humans to venture to the moon and beyond provides interesting human factors opportunities and challenges. The Human Engineering group at NASA has been involved in the initial phases of development of the Crew Exploration Vehicle (CEV), Orion. Getting involved at the ground level, Human Factors engineers are beginning to influence design; this involvement is expected to continue throughout the development lifecycle. The information presented here describes what has been done to date, what is currently going on, and what is expected in the future. During Phase 1, prior to the contract award to Lockheed Martin, the Human Engineering group was involved in generating requirements, conducting preliminary task analyses based on interviews with subject matter experts in all vehicle systems areas, and developing preliminary concepts of operations based on the task analysis results. In addition, some early evaluations to look at CEV net habitable volume were also conducted. The program is currently in Phase 2, which is broken down into design cycles, including System Readiness Review, Preliminary Design Review, and Critical Design Review. Currently, there are ongoing Human Engineering Technical Interchange Meetings being held with both NASA and Lockheed Martin in order to establish processes, desired products, and schedules. Multiple design trades and quick-look evaluations (e.g. display device layout and external window size) are also in progress. Future Human Engineering activities include requirement verification assessments and crew/stakeholder evaluations of increasing fidelity. During actual flights of the CEV, the Human Engineering group is expected to be involved in in-situ testing and lessons learned reporting, in order to benefit human space flight beyond the initial CEV program.

  6. Flexible Ablators: Applications and Arcjet Testing

    NASA Technical Reports Server (NTRS)

    Arnold, James O.; Venkatapathy, Ethiraj; Beck, Robin A S.; Mcguire, Kathy; Prabhu, Dinesh K.; Gorbunov, Sergey

    2011-01-01

    Flexible ablators were conceived in 2009 to meet the technology pull for large, human Mars Exploration Class, 23 m diameter hypersonic inflatable aerodynamic decelerators. As described elsewhere, they have been recently undergoing initial technical readiness (TRL) advancement by NASA. The performance limits of flexible ablators in terms of maximum heat rates, pressure and shear remain to be defined. Further, it is hoped that this emerging technology will vastly expand the capability of future NASA missions involving atmospheric entry systems. This paper considers four topics of relevance to flexible ablators: (1) Their potential applications to near/far term human and robotic missions (2) Brief consideration of the balance between heat shield diameter, flexible ablator performance limits, entry vehicle controllability and aft-body shear layer impingement of interest to designers of very large entry vehicles, (3) The approach for developing bonding processes of flexible ablators for use on rigid entry bodies and (4) Design of large arcjet test articles that will enable the testing of flexible ablators in flight-like, combined environments (heat flux, pressure, shear and structural tensile loading). Based on a review of thermal protection system performance requirements for future entry vehicles, it is concluded that flexible ablators have broad applications to conventional, rigid entry body systems and are enabling to large deployable (both inflatable and mechanical) heat shields. Because of the game-changing nature of flexible ablators, it appears that NASA's Office of the Chief Technologist (OCT) will fund a focused, 3-year TRL advancement of the new materials capable of performance in heat fluxes in the range of 200-600 W/sq. cm. This support will enable the manufacture and use of the large-scale arcjet test designs that will be a key element of this OCT funded activity.

  7. NASA integrated vehicle health management technology experiment for X-37

    NASA Astrophysics Data System (ADS)

    Schwabacher, Mark; Samuels, Jeff; Brownston, Lee

    2002-07-01

    The NASA Integrated Vehicle Health Management (IVHM) Technology Experiment for X-37 was intended to run IVHM software on board the X-37 spacecraft. The X-37 is an unpiloted vehicle designed to orbit the Earth for up to 21 days before landing on a runway. The objectives of the experiment were to demonstrate the benefits of in-flight IVHM to the operation of a Reusable Launch Vehicle, to advance the Technology Readiness Level of this IVHM technology within a flight environment, and to demonstrate that the IVHM software could operate on the Vehicle Management Computer. The scope of the experiment was to perform real-time fault detection and isolation for X-37's electrical power system and electro-mechanical actuators. The experiment used Livingstone, a software system that performs diagnosis using a qualitative, model-based reasoning approach that searches system-wide interactions to detect and isolate failures. Two of the challenges we faced were to make this research software more efficient so that it would fit within the limited computational resources that were available to us on the X-37 spacecraft, and to modify it so that it satisfied the X-37's software safety requirements. Although the experiment is currently unfunded, the development effort resulted in major improvements in Livingstone's efficiency and safety. This paper reviews some of the details of the modeling and integration efforts, and some of the lessons that were learned.

  8. 10th Arnual Great Moonbuggy Race

    NASA Technical Reports Server (NTRS)

    2003-01-01

    Students from across the United States and as far away as Puerto Rico came to Huntsville, Alabama for the 10th annual Great Moonbuggy Race at the U.S. Space Rocket Center. Sixty-eight teams, representing high schools and colleges from all over the United States, and Puerto Rico, raced human powered vehicles over a lunar-like terrain. Vehicles powered by two team members, one male and one female, raced one at a time over a half-mile obstacle course of simulated moonscape terrain. The competition is inspired by development, some 30 years ago, of the Lunar Roving Vehicle (LRV), a program managed by the Marshall Space Flight Center. The LRV team had to design a compact, lightweight, all-terrain vehicle that could be transported to the Moon in the small Apollo spacecraft. The Great Moonbuggy Race challenges students to design and build a human powered vehicle so they will learn how to deal with real-world engineering problems similar to those faced by the actual NASA LRV team. In this photograph, racers from C-1 High School in Lafayette County, Missouri, get ready to tackle the course. The team pedaled its way to victory over 29 other teams to take first place honors. It was the second year in a row a team from the school has placed first in the high school division. (NASA/MSFC)

  9. Microbiological Safety and Food Handling Practices of Seed Sprout Products in the Australian State of Victoria.

    PubMed

    Symes, Sally; Goldsmith, Paul; Haines, Heather

    2015-07-01

    Seed sprouts have been implicated as vehicles for numerous foodborne outbreaks worldwide. Seed sprouts pose a unique food safety concern because of the ease of microbiological seed contamination, the inherent ability of the sprouting process to support microbial growth, and their consumption either raw or lightly cooked. To examine seed sprout safety in the Australian state of Victoria, a survey was conducted to detect specific microbes in seed sprout samples and to investigate food handling practices relating to seed sprouts. A total of 298 seed sprout samples were collected from across 33 local council areas. Escherichia coli was detected in 14.8%, Listeria spp. in 12.3%, and Listeria monocytogenes in 1.3% of samples analyzed. Salmonella spp. were not detected in any of the samples. A range of seed sprout handling practices were identified as potential food safety issues in some food businesses, including temperature control, washing practices, length of storage, and storage in proximity to unpackaged ready-to-eat potentially hazardous foods.

  10. SIMBIOS Project

    NASA Technical Reports Server (NTRS)

    Fargion, Giulietta S.; McClain, Charles R.

    2002-01-01

    The purpose of this technical report is to provide current documentation of the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project. The SIMBIOS Science Team Principal Investigators' (PIs) original contributions to this report are in chapters four and above. The purpose of these contributions is to describe the current research status of the SIMBIOS-NRA-96 funded research. The contributions are published as submitted, with the exception of minor edits to correct obvious grammatical or clerical errors.

  11. Reducing young driver road trauma: guidance and optimism for the future

    PubMed Central

    Senserrick, T M

    2006-01-01

    This paper highlights lessons from each of the Expert Panel papers in the present supplement that provide guidance for future research and initiatives. Although some shortfalls still remain in our understanding, it is argued that much has been learned and we are ready for more translation, implementation, and evaluation of multilevel interventions to help reduce young driver road trauma. Non‐use of restraints, speeding, driving at night and with passengers, and fatigue are highlighted as key risk factors to address. “Best practice” intervention is proposed as implementing and strengthening graduated driver licensing systems and complementary candidate programs and research, such as hazard perception training programs. A schematic cognitive‐perceptual model to explain the crash sequence process is explored. There is optimism that meaningful impacts can be made, especially coupled with the advances in vehicle technologies, but caution is necessary in the absence of targeted “real world” evaluations and broader implementation and diffusion strategies. PMID:16788114

  12. KSC-2011-6387

    NASA Image and Video Library

    2011-08-11

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, space shuttle Endeavour, its nose encased in protective plastic where its forward reaction control system (FRCS) once resided, is towed out of Orbiter Processing Facility-1 (OPF-1) for its move to the Vehicle Assembly Building (VAB). Endeavour is switching places with shuttle Discovery which temporarily has been stored in the VAB. Both shuttles will stop briefly outside OPF-3 for a "nose-to-nose" photo opportunity. Discovery then will be rolled into OPF-1 and Endeavour into the VAB. In OPF-1, Discovery will undergo further preparations for public display at the Smithsonian's National Air and Space Museum Steven F. Udvar-Hazy Center in Virginia. Endeavour will be stored in the VAB until October when it will be moved into OPF-2 for further work to get it ready for public display at the California Science Center in Los Angeles. For more information, visit http://www.nasa.gov/shuttle. Photo credit: NASA/Jim Grossmann

  13. Thermal Imaging for Assessment of Electron-Beam Free Form Fabrication (EBF(sup 3)) Additive Manufacturing Welds

    NASA Technical Reports Server (NTRS)

    Zalameda, Joseph N.; Burke, Eric R.; Hafley, Robert A.; Taminger, Karen M.; Domack, Christopher S.; Brewer, Amy R.; Martin, Richard E.

    2013-01-01

    Additive manufacturing is a rapidly growing field where 3-dimensional parts can be produced layer by layer. NASA s electron beam free-form fabrication (EBF(sup 3)) technology is being evaluated to manufacture metallic parts in a space environment. The benefits of EBF(sup 3) technology are weight savings to support space missions, rapid prototyping in a zero gravity environment, and improved vehicle readiness. The EBF(sup 3) system is composed of 3 main components: electron beam gun, multi-axis position system, and metallic wire feeder. The electron beam is used to melt the wire and the multi-axis positioning system is used to build the part layer by layer. To insure a quality weld, a near infrared (NIR) camera is used to image the melt pool and solidification areas. This paper describes the calibration and application of a NIR camera for temperature measurement. In addition, image processing techniques are presented for weld assessment metrics.

  14. Slush Hydrogen Technology Program

    NASA Technical Reports Server (NTRS)

    Cady, Edwin C.

    1994-01-01

    A slush hydrogen (SH2) technology facility (STF) was designed, fabricated, and assembled by a contractor team of McDonnell Douglas Aerospace (MDA), Martin Marietta Aerospace Group (MMAG), and Air Products and Chemicals, Inc. (APCI). The STF consists of a slush generator which uses the freeze-thaw production process, a vacuum subsystem, a test tank which simulates the NASP vehicle, a triple point hydrogen receiver tank, a transfer subsystem, a sample bottle, a pressurization system, and a complete instrumentation and control subsystem. The STF was fabricated, checked-out, and made ready for testing under this contract. The actual SH2 testing was performed under the NASP consortium following NASP teaming. Pre-STF testing verified SH2 production methods, validated special SH2 instrumentation, and performed limited SH2 pressurization and expulsion tests which demonstrated the need for gaseous helium pre-pressurized of SH2 to control pressure collapse. The STF represents cutting-edge technology development by an effective Government-Industry team under very tight cost and schedule constraints.

  15. Readiness of Teachers for Change in Schools

    ERIC Educational Resources Information Center

    Kondakci, Yasar; Beycioglu, Kadir; Sincar, Mehmet; Ugurlu, Celal Teyyar

    2017-01-01

    Theorizing on the role of teacher attitudes in change effectiveness, this study examined the predictive value of context (trust), process (social interaction, participative management and knowledge sharing) and outcome (job satisfaction and workload perception) variables for cognitive, emotional and intentional readiness of teachers for change.…

  16. Operational readiness review phase-1 final report for WRAP-1

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Bowen, W., Westinghouse Hanford

    1996-12-27

    This report documents the Operational Readiness Review for WRAP-1 Phase-1 operations. The report includes all criteria, lines of inquiry with resulting Findings and Observations. The review included assessing operational capability of the organization and the computer controlled process and facility systems.

  17. Microbiological quality of ready-to-eat salads: an underestimated vehicle of bacteria and clinically relevant antibiotic resistance genes.

    PubMed

    Campos, Joana; Mourão, Joana; Pestana, Nazaré; Peixe, Luísa; Novais, Carla; Antunes, Patrícia

    2013-09-16

    The increase demand for fresh vegetables is causing an expansion of the market for minimally processed vegetables along with new recognized food safety problems. To gain further insight on this topic we analyzed the microbiological quality of Portuguese ready-to-eat salads (RTS) and their role in the spread of bacteria carrying acquired antibiotic resistance genes, food products scarcely considered in surveillance studies. A total of 50 RTS (7 brands; split or mixed leaves, carrot, corn) were collected in 5 national supermarket chains in Porto region (2010). They were tested for aerobic mesophilic counts, coliforms and Escherichia coli counts as well as for the presence of Salmonella and Listeria monocytogenes. Samples were also plated in different selective media with/without antibiotics before and after enrichment. The E. coli, other coliforms and Enterococcus recovered were characterized for antibiotic resistance profiles and clonality with phenotypic and genetic approaches. A high number of RTS presented poor microbiological quality (86%--aerobic mesophilic counts, 74%--coliforms, 4%--E. coli), despite the absence of screened pathogens. In addition, a high diversity of bacteria (species and clones) and antibiotic resistance backgrounds (phenotypes and genotypes) were observed, mostly with enrichment and antibiotic selective media. E. coli was detected in 13 samples (n=78; all types and 4 brands; phylogenetic groups A, B1 and D; none STEC) with resistance to tetracycline [72%; tet(A) and/or tet(B)], streptomycin (58%; aadA and/or strA-strB), sulfamethoxazole (50%; sul1 and/or sul2), trimethoprim (50%; dfrA1 or dfrA12), ampicillin (49%; blaTEM), nalidixic acid (36%), ciprofloxacin (5%) or chloramphenicol (3%; catA). E. coli clones, including the widespread group D/ST69, were detected in different samples from the same brand or different brands pointing out to a potential cross-contamination. Other clinically relevant resistance genes were detected in 2 Raoultella terrigena carrying a bla(SHV-2) and 1 Citrobacter freundii isolate with a qnrB9 gene. Among Enterococcus (n=108; 35 samples; Enterococcus casseliflavus--40, Enterococcus faecalis--20, Enterococcus faecium--18, Enterococcus hirae--9, Enterococcus gallinarum--5, and Enterococcus spp.--16) resistance was detected for tetracyclines [6%; tet(M) and/or tet(L)], erythromycin [3%; erm(B)], nitrofurantoin (1%) or ciprofloxacin (1%). The present study places ready-to-eat salads within the spectrum of ecological niches that may be vehicles for antibiotic resistance bacteria/genes with clinical interest (e.g. E. coli-D-ST69; bla(SHV-2)) and these findings are worthy of attention as their spread to humans by ingestion cannot be dismissed. © 2013 Elsevier B.V. All rights reserved.

  18. Executive functions and school readiness intervention: Impact, moderation, and mediation in the Head Start REDI program

    PubMed Central

    BIERMAN, KAREN L.; NIX, ROBERT L.; GREENBERG, MARK T.; BLAIR, CLANCY; DOMITROVICH, CELENE E.

    2011-01-01

    Despite their potentially central role in fostering school readiness, executive function (EF) skills have received little explicit attention in the design and evaluation of school readiness interventions for socioeconomically disadvantaged children. The present study examined a set of five EF measures in the context of a randomized-controlled trial of a research-based intervention integrated into Head Start programs (Head Start REDI). Three hundred fifty-six 4-year-old children (17% Hispanic, 25% African American; 54% girls) were followed over the course of the prekindergarten year. Initial EF predicted gains in cognitive and social–emotional skills and moderated the impact of the Head Start REDI intervention on some outcomes. The REDI intervention promoted gains on two EF measures, which partially mediated intervention effects on school readiness. We discuss the importance of further study of the neurobiological bases of school readiness, the implications for intervention design, and the value of incorporating markers of neurobiological processes into school readiness interventions. PMID:18606033

  19. Design and Development of a 200-kW Turbo-Electric Distributed Propulsion Testbed

    NASA Technical Reports Server (NTRS)

    Papathakis, Kurt V.; Kloesel, Kurt J.; Lin, Yohan; Clarke, Sean; Ediger, Jacob J.; Ginn, Starr

    2016-01-01

    The National Aeronautics and Space Administration (NASA) Armstrong Flight Research Center (AFRC) (Edwards, California) is developing a Hybrid-Electric Integrated Systems Testbed (HEIST) Testbed as part of the HEIST Project, to study power management and transition complexities, modular architectures, and flight control laws for turbo-electric distributed propulsion technologies using representative hardware and piloted simulations. Capabilities are being developed to assess the flight readiness of hybrid electric and distributed electric vehicle architectures. Additionally, NASA will leverage experience gained and assets developed from HEIST to assist in flight-test proposal development, flight-test vehicle design, and evaluation of hybrid electric and distributed electric concept vehicles for flight safety. The HEIST test equipment will include three trailers supporting a distributed electric propulsion wing, a battery system and turbogenerator, dynamometers, and supporting power and communication infrastructure, all connected to the AFRC Core simulation. Plans call for 18 high performance electric motors that will be powered by batteries and the turbogenerator, and commanded by a piloted simulation. Flight control algorithms will be developed on the turbo-electric distributed propulsion system.

  20. H-II Transfer Vehicle (HTV) and the Operations Concept for Extravehicular Activity (EVA) Hardware

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda

    2010-01-01

    With the retirement of the Space Shuttle fleet imminent in 2011, a new concept of operations will become reality to meet the transportation challenges of the International Space Station (ISS). The planning associated with the retirement of the Space Shuttle has been underway since the announcement in 2004. Since then, several companies and government entities have had to look for innovative low-cost commercial orbital transportation systems to continue to achieve the objectives of ISS delivery requirements. Several options have been assessed and appear ready to meet the large and demanding delivery requirements of the ISS. Options that have been identified that can facilitate the challenge include the Russian Federal Space Agency's Soyuz and Progress spacecraft, European Space Agency's Automated Transfer Vehicle (ATV), the Japan Aerospace Exploration Agency's (JAXA's) H-II Transfer Vehicle (HTV) and the Boeing Delta IV Heavy (DIV-H). The newest of these options is the JAXA's HTV. This paper focuses on the HTV, mission architecture and operations concept for Extra-Vehicular Activities (EVA) hardware, the associated launch system, and details of the launch operations approach.

  1. H-II Transfer Vehicle (HTV) and the Operations Concept for Extravehicular Activity (EVA) Hardware

    NASA Technical Reports Server (NTRS)

    Chullen, Cinda; Blome, Elizabeth; Tetsuya, Sakashita

    2011-01-01

    With the retirement of the Space Shuttle fleet imminent in 2011, a new operations concept will become reality to meet the transportation challenges of the International Space Station (ISS). The planning associated with the retirement of the Space Shuttle has been underway since the announcement in 2004. Since then, several companies and government entities have had to look for innovative low-cost commercial orbital transportation systems to continue to achieve the objectives of ISS delivery requirements. Several options have been assessed and appear ready to meet the large and demanding delivery requirements of the ISS. Options that have been identified that can facilitate the challenge include the Russian Federal Space Agency's Soyuz and Progress spacecraft, European Space Agency's Automated Transfer Vehicle (ATV), and the Japan Aerospace Exploration Agency's (JAXA s) H-II Transfer Vehicle (HTV). The newest of these options is the JAXA's HTV. This paper focuses on the HTV, mission architecture and operations concept for Extra-Vehicular Activities (EVA) hardware, the associated launch system, and details of the launch operations approach.

  2. A novel vehicle for transmission of Escherichia coli O157:H7 to humans: multistate outbreak of E. coli O157:H7 infections associated with consumption of ready-to-bake commercial prepackaged cookie dough--United States, 2009.

    PubMed

    Neil, Karen P; Biggerstaff, Gwen; MacDonald, J Kathryn; Trees, Eija; Medus, Carlota; Musser, Kimberlee A; Stroika, Steven G; Zink, Don; Sotir, Mark J

    2012-02-15

     Escherichia coli O157:H7 is a Shiga toxin-producing E. coli (STEC) associated with numerous foodborne outbreaks in the United States and is an important cause of bacterial gastrointestinal illness. In May 2009, we investigated a multistate outbreak of E. coli O157:H7 infections.  Outbreak-associated cases were identified using serotyping and molecular subtyping procedures. Traceback investigation and product testing were performed. A matched case-control study was conducted to identify exposures associated with illness using age-, sex-, and state-matched controls.  Seventy-seven patients with illnesses during the period 16 March-8 July 2009 were identified from 30 states; 35 were hospitalized, 10 developed hemolytic-uremic syndrome, and none died. Sixty-six percent of patients were <19 years; 71% were female. In the case-control study, 33 of 35 case patients (94%) consumed ready-to-bake commercial prepackaged cookie dough, compared with 4 of 36 controls (11%) (matched odds ratio = 41.3; P < .001); no other reported exposures were significantly associated with illness. Among case patients consuming cookie dough, 94% reported brand A. Three nonoutbreak STEC strains were isolated from brand A cookie dough. The investigation led to a recall of 3.6 million packages of brand A cookie dough and a product reformulation.  This is the first reported STEC outbreak associated with consuming ready-to-bake commercial prepackaged cookie dough. Despite instructions to bake brand A cookie dough before eating, case patients consumed the product uncooked. Manufacturers should consider formulating ready-to-bake commercial prepackaged cookie dough to be as safe as a ready-to-eat product. More effective consumer education about the risks of eating unbaked cookie dough is needed.

  3. Understanding advance care planning as a process of health behavior change.

    PubMed

    Fried, Terri R; Bullock, Karen; Iannone, Lynne; O'Leary, John R

    2009-09-01

    To explore whether models of health behavior change can help to inform interventions for advance care planning (ACP). Qualitative cross-sectional study. Community. Sixty-three community-dwelling persons aged 65 and older and 30 caregivers with experience as surrogate decision-makers. In focus groups conducted separately with older persons and caregivers, participants were asked to discuss ways they had planned for future declines in health and why they had or had not engaged in such planning. Transcripts were analyzed using grounded theory. Four themes illustrated the potential of applying models of health behavior change to improve ACP. (1) Participants demonstrated variable readiness to engage in ACP and could be in different stages of readiness for different components of ACP, including consideration of treatment goals, completion of advance directives, and communication with families and physicians. (2) Participants identified a wide range of benefits of and barriers to ACP. (3) Participants used a variety of processes of change to progress through stages of readiness, and ACP was only one of a broader set of behaviors that participants engaged in to prepare for declines in their health or for death. (4) Experience with healthcare decision-making for loved ones was a strong influence on perceptions of susceptibility and engagement in ACP. The variability in participants' readiness, barriers and benefits, perceptions of susceptibility, and use of processes to increase readiness for participating in each component of ACP suggests the utility of customized, stage-specific interventions based on individualized assessments to improve ACP.

  4. Outbreak of Salmonella enterica serotype I 4,5,12:i:- infections: the challenges of hypothesis generation and microwave cooking.

    PubMed

    Mody, R K; Meyer, S; Trees, E; White, P L; Nguyen, T; Sowadsky, R; Henao, O L; Lafon, P C; Austin, J; Azzam, I; Griffin, P M; Tauxe, R V; Smith, K; Williams, I T

    2014-05-01

    We investigated an outbreak of 396 Salmonella enterica serotype I 4,5,12:i:- infections to determine the source. After 7 weeks of extensive hypothesis-generation interviews, no refined hypothesis was formed. Nevertheless, a case-control study was initiated. Subsequently, an iterative hypothesis-generation approach used by a single interviewing team identified brand A not-ready-to-eat frozen pot pies as a likely vehicle. The case-control study, modified to assess this new hypothesis, along with product testing indicated that the turkey variety of pot pies was responsible. Review of product labels identified inconsistent language regarding preparation, and the cooking instructions included undefined microwave wattage categories. Surveys found that most patients did not follow the product's cooking instructions and did not know their oven's wattage. The manufacturer voluntarily recalled pot pies and improved the product's cooking instructions. This investigation highlights the value of careful hypothesis-generation and the risks posed by frozen not-ready-to-eat microwavable foods.

  5. STS-92 Mission Specialist McArthur is ready to take his turn driving the M-113

    NASA Technical Reports Server (NTRS)

    2000-01-01

    STS-92 Mission Specialist Bill McArthur gets ready to take his turn at driving the M-113, part of emergency egress training during Terminal Countdown Demonstration Test (TCDT) activities. Behind him (left) is Mission Specialist Jeff Wisoff, waiting his turn to drive along with other unidentified crew members. The tracked vehicle could be used by the crew in the event of an emergency at the pad during which the crew must make a quick exit from the area. The TCDT also provides simulated countdown exercises and opportunities to inspect the mission payloads in the orbiter's payload bay. STS-92 is scheduled to launch Oct. 5 at 9:30 p.m. EDT on the fifth flight to the International Space Station. It will carry two elements of the Space Station, the Integrated Truss Structure Z1 and the third Pressurized Mating Adapter. The mission is also the 100th flight in the Shuttle program.

  6. An Assessment of Aerocapture and Applications to Future Missions to Uranus and Neptune

    NASA Astrophysics Data System (ADS)

    Beauchamp, P. M.; Spilker, T. R.

    2017-12-01

    Our investigation examined the current state of readiness of aerocapture at several destinations of interest, including Uranus and Neptune, to identify what technologies are needed, and to determine if a technology demonstration mission is required, prior to the first use of aerocapture for a science mission. The study team concluded that the current state of readiness is destination dependent, with aerocaptured missions feasible at Venus, Mars, and Titan with current technologies. The use of aerocapture for orbit insertion at the ice giant planets Uranus and Neptune requires at least additional study to assess the expected performance of new guidance, navigation, and control algorithms, and possible development of new hardware, such as a mid-L/D entry vehicle shape or new thermal protection system materials. A variety of near-term activities could contribute to risk reduction for missions proposing use of aerocapture, but a system-level technology demonstration mission is not deemed necessary before the use of aerocapture for a NASA science mission.

  7. Operational Readiness Review Plan for the Radioisotope Thermoelectric Generator Materials Production Tasks

    DOE R&D Accomplishments Database

    Cooper, R. H.; Martin, M. M.; Riggs, C. R.; Beatty, R. L.; Ohriner, E. K.; Escher, R. N.

    1990-04-19

    In October 1989, a US shuttle lifted off from Cape Kennedy carrying the spacecraft Galileo on its mission to Jupiter. In November 1990, a second spacecraft, Ulysses, will be launched from Cape Kennedy with a mission to study the polar regions of the sun. The prime source of power for both spacecraft is a series of radioisotope thermoelectric generators (RTGs), which use plutonium oxide (plutonia) as a heat source. Several of the key components in this power system are required to ensure the safety of both the public and the environment and were manufactured at Oak Ridge National Laboratory (ORNL) in the 1980 to 1983 period. For these two missions, Martin Marietta Energy Systems, Inc. (Energy Systems), will provide an iridium alloy component used to contain the plutonia heat source and a carbon composite material that serves as a thermal insulator. ORNL alone will continue to fabricate the carbon composite material. Because of the importance to DOE that Energy Systems deliver these high quality components on time, performance of an Operational Readiness Review (ORR) of these manufacturing activities is necessary. Energy Systems Policy GP 24 entitled "Operational Readiness Process" describes the formal and comprehensive process by which appropriate Energy Systems activities are to be reviewed to ensure their readiness. This Energy System policy is aimed at reducing the risks associated with mission success and requires a management approved "readiness plan" to be issued. This document is the readiness plan for the RTG materials production tasks.

  8. Management assessment of tank waste remediation system contractor readiness to proceed with phase 1B privatization

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Honeyman, J.O.

    1998-01-09

    This Management Assessment of Tank Waste Remediation System (TWRS) Contractor Readiness to Proceed With Phase 1B Privatization documents the processes used to determine readiness to proceed with tank waste treatment technologies from private industry, now known as TWRS privatization. An overall systems approach was applied to develop action plans to support the retrieval and disposal mission of the TWRS Project. The systems and infrastructure required to support the mission are known. Required systems are either in place or plans have been developed to ensure they exist when needed. Since October 1996 a robust system engineering approach to establishing integrated Technicalmore » Baselines, work breakdown structures, tank farms organizational structure and configurations, work scope, and costs has become part of the culture within the TWRS Project. An analysis of the programmatic, management, and technical activities necessary to declare readiness to proceed with execution of the mission demonstrates that the system, personnel, and hardware will be on-line and ready to support the private contractors. The systems approach included defining the retrieval and disposal mission requirements and evaluating the readiness of the Project Hanford Management Contract (PHMC) team to support initiation of waste processing by the private contractors in June 2002 and to receive immobilized waste shortly thereafter. The Phase 1 feed delivery requirements from the private contractor Requests for Proposal were reviewed. Transfer piping routes were mapped, existing systems were evaluated, and upgrade requirements were defined.« less

  9. 32 CFR Appendix A to Part 44 - Guidance

    Code of Federal Regulations, 2010 CFR

    2010-07-01

    ... manpower needs of the civilian sector and the military that the Ready Reserve screening process has...) Are there other factors related to the national defense, health, or safety that will make the... Reservists. Non-Federal employers of Ready Reservists, particularly in the fields of public health and safety...

  10. 78 FR 58309 - Proposed Information Collection Activity; Comment Request

    Federal Register 2010, 2011, 2012, 2013, 2014

    2013-09-23

    ... initiative, funded by the Children's Bureau (CB) within ACF, will support planning grants to develop a model... for the process evaluation will be used to assess grantees' organizational capacity and readiness to... response burden hours Baseline Telephone Interview of 540 270 1 1.0 270 Organizational Readiness...

  11. Detonation command and control

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Mace, Jonathan Lee; Seitz, Gerald J.; Echave, John A.

    The detonation of one or more explosive charges and propellant charges by a detonator in response to a fire control signal from a command and control system comprised of a command center and instrumentation center with a communications link therebetween. The fire control signal is selectively provided to the detonator from the instrumentation center if plural detonation control switches at the command center are in a fire authorization status, and instruments, and one or more interlocks, if included, are in a ready for firing status. The instrumentation and command centers are desirably mobile, such as being respective vehicles.

  12. Hybrid Propulsion Demonstration Program 250K Hybrid Motor

    NASA Technical Reports Server (NTRS)

    Story, George; Zoladz, Tom; Arves, Joe; Kearney, Darren; Abel, Terry; Park, O.

    2003-01-01

    The Hybrid Propulsion Demonstration Program (HPDP) program was formed to mature hybrid propulsion technology to a readiness level sufficient to enable commercialization for various space launch applications. The goal of the HPDP was to develop and test a 250,000 pound vacuum thrust hybrid booster in order to demonstrate hybrid propulsion technology and enable manufacturing of large hybrid boosters for current and future space launch vehicles. The HPDP has successfully conducted four tests of the 250,000 pound thrust hybrid rocket motor at NASA's Stennis Space Center. This paper documents the test series.

  13. Ride the Cyclone

    DTIC Science & Technology

    2009-01-01

    turned out to be a huge comfort to have with me that day. As I jumped into my tank hatch, I gave the order for the entire company to get ready to move...I looked down at my hands and saw what was left of my goggles – one lens. I had no idea where the rest of the goggles were but I could feel the...the fact that my company had once again been given what I view as the “crap” mission. I hopped out of my vehicle and strode over to tell Alan about

  14. Is Intelligent Speed Adaptation ready for deployment?

    PubMed

    Carsten, Oliver

    2012-09-01

    There have been 30 years of research on Intelligent Speed Adaptation (ISA), the in-vehicle system that is designed to promote compliance with speed limits. Extensive trials of ISA in real-world driving have shown that ISA can significantly reduce speeding, users have been found to have generally positive attitudes and at least some sections of the public have been shown to be willing to purchase ISA systems. Yet large-scale deployment of a system that could deliver huge accident reductions is still by no means guaranteed. Copyright © 2012. Published by Elsevier Ltd.

  15. The SHEFEX II Thermal Protection System

    NASA Astrophysics Data System (ADS)

    Bohrk, H.; Elsaber, H.; Weihs, H.

    2011-05-01

    The SHEFEXII payload tip is ready for flight. Within a period of three years, the experiment has been designed, laid out, parts have been manufactured, mounted and instrumented for the upcoming flight in autumn 2011. The present paper gives an overview over the thermal protection system (TPS) of the SHEFEX II vehicle including the TPS-material, the overall TPS-setup, and detailed informations on the faceted ther- mal protection including the gap seal, the sharp leading edge, the transpiration-cooling experiment AKTIV, and the aerodynamic control surfaces, i.e. canards.

  16. KSC01pp0125

    NASA Image and Video Library

    2001-01-17

    The U.S. Lab Destiny is ready to be moved from Atlantis’ payload bay into the Payload Changeout Room. After the move, Atlantis will roll back to the Vehicle Assembly Building to allow workers to conduct inspections, continuity checks and X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis

  17. KSC-04pd1446

    NASA Image and Video Library

    2004-07-06

    KENNEDY SPACE CENTER, FLA. - The Boeing Delta II Heavy second-stage engine, the Aerojet AJ10-118K, is ready for lifting up the mobile service tower at Pad 17-B, Cape Canaveral Air Force Station. The Delta II is the launch vehicle for the MESSENGER (Mercury Surface, Space Environment, Geochemistry and Ranging) spacecraft, scheduled to lift off Aug. 2. Bound for Mercury, the spacecraft is expected to reach orbit around the planet in March 2011. MESSENGER was built for NASA by the Johns Hopkins University Applied Physics Laboratory in Laurel, Md.

  18. Detonation command and control

    DOEpatents

    Mace, Jonathan L.; Seitz, Gerald J.; Echave, John A.; Le Bas, Pierre-Yves

    2015-11-10

    The detonation of one or more explosive charges and propellant charges by a detonator in response to a fire control signal from a command and control system comprised of a command center and instrumentation center with a communications link therebetween. The fire control signal is selectively provided to the detonator from the instrumentation center if plural detonation control switches at the command center are in a fire authorization status, and instruments, and one or more interlocks, if included, are in a ready for firing status. The instrumentation and command centers are desirably mobile, such as being respective vehicles.

  19. Detonation command and control

    DOEpatents

    Mace, Jonathan L.; Seitz, Gerald J.; Echave, John A.; Le Bas, Pierre-Yves

    2016-05-31

    The detonation of one or more explosive charges and propellant charges by a detonator in response to a fire control signal from a command and control system comprised of a command center and instrumentation center with a communications link there between. The fire control signal is selectively provided to the detonator from the instrumentation center if plural detonation control switches at the command center are in a fire authorization status, and instruments, and one or more interlocks, if included, are in a ready for firing status. The instrumentation and command centers are desirably mobile, such as being respective vehicles.

  20. KSC-2009-2669

    NASA Image and Video Library

    2009-04-15

    CAPE CANAVERAL, Fla. – On Cape Canaveral Air Force Station's Launch Complex 17-B in Florida, the first stage of a Delta II rocket is ready to be lifted into the mobile service tower. The rocket is the launch vehicle for the STSS Demonstrators Program. STSS Demonstrators Program is a midcourse tracking technology demonstrator and is part of an evolving ballistic missile defense system. STSS is capable of tracking objects after boost phase and provides trajectory information to other sensors. It will be launched by NASA for the Missile Defense Agency on July 29. Photo credit: NASA/Jack Pfaller

  1. Saturn V Second Stage (S-II) Ready for Static Test

    NASA Technical Reports Server (NTRS)

    1965-01-01

    Two workers are dwarfed by the five J-2 engines of the Saturn V second stage (S-II) as they make final inspections prior to a static test firing by North American Space Division. These five hydrogen -fueled engines produced one million pounds of thrust, and placed the Apollo spacecraft into earth orbit before departing for the moon. The towering 363-foot Saturn V was a multi-stage, multi-engine launch vehicle standing taller than the Statue of Liberty. Altogether, the Saturn V engines produced as much power as 85 Hoover Dams.

  2. Incorporating Human Readiness Levels at Sandia National Laboratories

    DOE PAGES

    See, Judi E.; Morris, Jason; Craft, Richard; ...

    2018-01-24

    Since 2010, the concept of human readiness levels has been under development as a possible supplement to the existing technology readiness level (TRL) scale. The intent is to provide a mechanism to address safety and performance risks associated with the human component in a system that parallels the TRL structure already familiar to the systems engineering community. Sandia National Laboratories in Albuquerque, New Mexico, initiated a study in 2015 to evaluate options to incorporate human readiness planning for Sandia processes and products. The study team has collected the majority of baseline assessment data and has conducted interviews to understand staffmore » perceptions of four different options for human readiness planning. Preliminary results suggest that all four options may have a vital role, depending on the type of work performed and the phase of product development. Upon completion of data collection, the utility of identified solutions will be assessed in one or more test cases.« less

  3. Technology and Manufacturing Readiness of Early Market Motive and Non-Motive Hydrogen Storage Technologies for Fuel Cell Applications

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Ronnebro, Ewa

    PNNL’s objective in this report is to provide DOE with a technology and manufacturing readiness assessment to identify hydrogen storage technologies’ maturity levels for early market motive and non-motive applications and to provide a path forward toward commercialization. PNNL’s Technology Readiness Assessment (TRA) is based on a combination of Technology Readiness Level (TRL) and Manufacturing Readiness Level (MRL) designations that enable evaluation of hydrogen storage technologies in varying levels of development. This approach provides a logical methodology and roadmap to enable the identification of hydrogen storage technologies, their advantages/disadvantages, gaps and R&D needs on an unbiased and transparent scale thatmore » is easily communicated to interagency partners. The TRA report documents the process used to conduct the TRA, reports the TRL and MRL for each assessed technology and provides recommendations based on the findings.« less

  4. When and How Does Psychological Voice Climate Influence Individual Change Readiness? The Mediating Role of Normative Commitment and the Moderating Role of Work Engagement

    PubMed Central

    Lee, Chun-Hsien; Wang, Mei-Ling; Liu, Min-Shi

    2017-01-01

    This research explores the linking mechanisms and conditional processes underlying the relationship between psychological voice climate and individual change readiness. In accordance with the social identity theory, we argued that normative commitment would mediate the relationship between psychological voice climate and individual change readiness; furthermore, work engagement would moderate the proposed indirect effect. Two-wave survey data were collected from 187 full-time employees in a government-owned institute of research and development and were adopted for moderated mediation analysis. The results showed that normative commitment mediates the relationship between psychological voice climate and individual change readiness. Furthermore, work engagement strengthens the effect of psychological voice climate on individual change readiness in an indirect manner via normative commitment. Based on the findings, the theoretical implications and practical suggestions were discussed. PMID:29062294

  5. Incorporating Human Readiness Levels at Sandia National Laboratories

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    See, Judi E.; Morris, Jason; Craft, Richard

    Since 2010, the concept of human readiness levels has been under development as a possible supplement to the existing technology readiness level (TRL) scale. The intent is to provide a mechanism to address safety and performance risks associated with the human component in a system that parallels the TRL structure already familiar to the systems engineering community. Sandia National Laboratories in Albuquerque, New Mexico, initiated a study in 2015 to evaluate options to incorporate human readiness planning for Sandia processes and products. The study team has collected the majority of baseline assessment data and has conducted interviews to understand staffmore » perceptions of four different options for human readiness planning. Preliminary results suggest that all four options may have a vital role, depending on the type of work performed and the phase of product development. Upon completion of data collection, the utility of identified solutions will be assessed in one or more test cases.« less

  6. Acceptability, Knowledge, Beliefs, and Partners as Determinants of Zambian Men's Readiness to Undergo Medical Male Circumcision

    PubMed Central

    Jones, Deborah; Cook, Ryan; Arheart, Kris; Redding, Colleen A.; Zulu, Robert; Castro, Jose; Weiss, Stephen M.

    2013-01-01

    There is limited information about the influence of partners on medical male circumcision (MMC) uptake. This study aimed to evaluate attitudes, knowledge, and preferences about MMC among men and their partners, and their relative impact on male readiness to undergo the MMC procedure. Male participants (n = 354) and their partners (n = 273) were recruited from community health centers in Lusaka, Zambia. Men reported their readiness to undergo MMC, and both men and women were assessed regarding their attitudes and knowledge regarding MMC. Men who had discussed MMC with their partners, those who endorsed MMC for HIV risk reduction, and those viewing MMC as culturally acceptable reported increased readiness to undergo MMC. Additionally, endorsement of MMC by female partners was associated with increased men’s readiness. Results support promotion of cultural acceptability of MMC, and efforts to increase MMC uptake may benefit from incorporating partners in the decision making process. PMID:23757123

  7. When and How Does Psychological Voice Climate Influence Individual Change Readiness? The Mediating Role of Normative Commitment and the Moderating Role of Work Engagement.

    PubMed

    Lee, Chun-Hsien; Wang, Mei-Ling; Liu, Min-Shi

    2017-01-01

    This research explores the linking mechanisms and conditional processes underlying the relationship between psychological voice climate and individual change readiness. In accordance with the social identity theory, we argued that normative commitment would mediate the relationship between psychological voice climate and individual change readiness; furthermore, work engagement would moderate the proposed indirect effect. Two-wave survey data were collected from 187 full-time employees in a government-owned institute of research and development and were adopted for moderated mediation analysis. The results showed that normative commitment mediates the relationship between psychological voice climate and individual change readiness. Furthermore, work engagement strengthens the effect of psychological voice climate on individual change readiness in an indirect manner via normative commitment. Based on the findings, the theoretical implications and practical suggestions were discussed.

  8. Chinese baccalaureate nursing students' readiness for self-directed learning.

    PubMed

    Yuan, Hao Bin; Williams, Beverly A; Fang, Jin Bo; Pang, Dong

    2012-05-01

    This descriptive cross-sectional study was conducted with 536 Chinese nursing students to explore students' readiness for self-directed learning (SDL). The Self-Directed Learning Readiness (SDLR) Scale for nursing education (Chinese translation version) was used. The value of the content validity index tested by five experts was 0.915. A measure of internal consistency (Cronbach's alpha) was 0.925 on the total scale. Students possessed readiness for SDL with a mean score of 157.72 (S.D.=15.08, 62.3% in high level, and 37.7% in low level). The attributes of Chinese students, such as a strong sense of responsibility and perseverance, due diligence and rigorous self-discipline, enable students to take the initiative and responsibility for their own learning. The existing variation in students' readiness for SDL is helpful in identifying student characteristics that might be used to modify learning activities for these students. Senior students had higher scores for SDLR than junior students. This finding likely reflects the maturational process of developing self-directedness. Promoting SDL skills is a challenging process for faculty members and students. It is helpful if nurse educators assess the learning styles and preferences of their students in order to determine the level of SDL activities to include from year to year in the curriculum. Copyright © 2011 Elsevier Ltd. All rights reserved.

  9. Assessing infant and maternal readiness for newborn discharge.

    PubMed

    Jing, Ling; Bethancourt, Casidhe-Nicole; McDonagh, Thomas

    2017-10-01

    The review highlights the shift from prescribed length of stay (LOS) to mother-infant dyad readiness as the basis for making discharge decisions for healthy term newborns. We describe the components of readiness that should be considered in making the decision, focusing on infant clinical readiness, and maternal and familial readiness. Although the Newborns' and Mothers' Health Protection Act of 1996 aimed to protect infants and mothers by establishing a minimum LOS, the American Academy of Pediatrics 2015 policy on newborn discharge acknowledges the shift from LOS-based to readiness-based discharge decision-making. Healthcare providers must consider a variety of infant and maternal characteristics in determining the appropriate time to discharge a dyad, and mothers should be actively involved in the decision-making process. Criteria for infant clinical readiness include the following: establishment of effective feeding, evaluation of jaundice risk, review and discussion of infant and household vaccination status, obtainment of specimen for metabolic screening, tests of hearing ability, assessment of sepsis risk factors, screening for congenital heart disease, and evaluation of parental knowledge about infant safety measures. Important consideration should also be given to the mother's sociodemographic vulnerabilities, maternal confidence and perception of discharge readiness, and availability of postdischarge care continuity. The timing of newborn discharge should be a joint decision made by the mother and healthcare providers based on readiness. The decision should consider the infant's health status, the mother's health status, the mother's perception of readiness, and the availability of social and familial support for the mother and infant. Accessible and comprehensive support postdischarge is also important for helping infants achieve optimal health outcomes.

  10. The Very Specific Vortex Shedding Test on VEGA Launch Vehicle

    NASA Astrophysics Data System (ADS)

    Leofanti, Jose Luis; Fotio, Domenico; Grillenbeck, Anton; Dillinger, Stephan; Scaccia, Aldo

    2012-07-01

    When tall structures are subjected to lateral wind flow, under certain conditions, vortices are shed from alternate sides of the structure inducing periodic cross wind loads on the structure. The periodic loads, in a relatively narrow and stable frequency band, can couple with the structure’s natural frequencies. To avoid this effect the VEGA Launch System (LS) comprised a decoupling device at the launch vehicle (LV) base called Anti Vortex Shedding (AVS). During the LV-Ground Segment combined test campaign in Kourou, the LV mounted on AVS was experimentally verified, including a modal characterization test, a verification under artificial operational loads and finally tested under real wind environment. The paper gives an overview on the particular aspects of test planning, the test setup preparation inside the launch pad gantry, the test performance, test results and the conclusion for the VEGA launch system’s operational readiness.

  11. KSC-00pp1654

    NASA Image and Video Library

    2000-11-07

    Mission Specialist Carlos Noriega (front) gets ready to take the wheel of an M-113. In the rear can be seen Mission Specialists Marc Garneau (left) and Joe Tanner (right). Learning to drive the armored vehicle is part of emergency egress training during Terminal Countdown Demonstration Test (TCDT) activities. The tracked vehicle could be used by the crew in the event of an emergency at the pad during which the crew must make a quick exit from the area. The TCDT, also includes a simulated launch countdown and opportunities to inspect the mission payloads in the orbiter’s payload bay. Mission STS-97is the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections. STS-97 is scheduled to launch Nov. 30 at 10:05 p.m. EST

  12. KSC-2012-6175

    NASA Image and Video Library

    2012-11-05

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, a space shuttle era mobile launcher platform, on the left, sits on pedestals outside the Vehicle Assembly Building. To the right is the mobile launcher that will support the space agency's Space Launch System heavy-lift rocket and Orion spacecraft. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

  13. KSC-2012-6163

    NASA Image and Video Library

    2012-11-05

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 has been undergoing modifications inside high bay 2 of the Vehicle Assembly Building in preparation to carry the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

  14. KSC-2012-6176

    NASA Image and Video Library

    2012-11-05

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 is parked outside of the Vehicle Assembly Building. The Crawler-transporter has been undergoing modifications to ensure its ability to carry the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

  15. KSC-2012-6214

    NASA Image and Video Library

    2012-11-08

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/ Dimitri Gerondidakis

  16. KSC-2012-6185

    NASA Image and Video Library

    2012-11-06

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 moves along the crawler way toward Launch Pad 39A following modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the launch pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Jim Grossmann

  17. KSC-2012-6199

    NASA Image and Video Library

    2012-11-06

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Ben Smegelsky

  18. KSC-2012-6213

    NASA Image and Video Library

    2012-11-08

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/ Dimitri Gerondidakis

  19. KSC-2012-6207

    NASA Image and Video Library

    2012-11-08

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/ Dimitri Gerondidakis

  20. KSC-2012-6208

    NASA Image and Video Library

    2012-11-08

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/ Dimitri Gerondidakis

  1. KSC-2012-6203

    NASA Image and Video Library

    2012-11-08

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/ Dimitri Gerondidakis

  2. KSC-2012-6205

    NASA Image and Video Library

    2012-11-08

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/ Dimitri Gerondidakis

  3. KSC-2012-6201

    NASA Image and Video Library

    2012-11-06

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Ben Smegelsky

  4. KSC-2012-6202

    NASA Image and Video Library

    2012-11-08

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/ Dimitri Gerondidakis

  5. KSC-2012-6198

    NASA Image and Video Library

    2012-11-06

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles projects to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/Ben Smegelsky

  6. KSC-2012-6209

    NASA Image and Video Library

    2012-11-08

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/ Dimitri Gerondidakis

  7. KSC-2012-6211

    NASA Image and Video Library

    2012-11-08

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/ Dimitri Gerondidakis

  8. KSC-2012-6204

    NASA Image and Video Library

    2012-11-08

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/ Dimitri Gerondidakis

  9. KSC-2012-6206

    NASA Image and Video Library

    2012-11-08

    CAPE CANAVERAL, Fla. -- At NASA's Kennedy Space Center in Florida, crawler-transporter No. 2 arrives at Launch Pad 39A to check out recently completed modifications to ensure its ability to carry launch vehicles such as the space agency's Space Launch System heavy-lift rocket to the pad. NASA's Ground Systems Development and Operations Program is leading the 20-year life-extension project for the crawler. A pair of behemoth machines called crawler-transporters has carried the load of taking rockets and spacecraft to the launch pad for more than 40 years at NASA’s Kennedy Space Center in Florida. Each the size of a baseball infield and powered by locomotive and large electrical power generator engines, the crawler-transporters will stand ready to keep up the work for the next generation of launch vehicles to lift astronauts into space. For more information, visit http://www.nasa.gov/exploration/systems/ground/index.html Photo credit: NASA/ Dimitri Gerondidakis

  10. KSC-04pd1826

    NASA Image and Video Library

    2004-09-02

    KENNEDY SPACE CENTER, FLA. - At Vandenberg Air Force Base in California, the Demonstration of Autonomous Rendezvous Technology (DART) spacecraft (right) is ready for mating with the upper stage (foreground) in preparation for launch on the Orbital Sciences Pegasus XL. DART was designed and built for NASA by Orbital Sciences Corporation as an advanced flight demonstrator to locate and maneuver near an orbiting satellite. DART weighs about 800 pounds and is nearly 6 feet long and 3 feet in diameter. The Pegasus XL will launch DART into a circular polar orbit of approximately 475 miles. DART is designed to demonstrate technologies required for a spacecraft to locate and rendezvous, or maneuver close to, other craft in space. Results from the DART mission will aid in the development of NASA’s Crew Exploration Vehicle and will also assist in vehicle development for crew transfer and crew rescue capability to and from the International Space Station.

  11. KSC-04pd1820

    NASA Image and Video Library

    2004-09-01

    KENNEDY SPACE CENTER, FLA. - At Vandenberg Air Force Base in California, the Demonstration of Autonomous Rendezvous Technology (DART) spacecraft (in background) has been rotated from vertical to horizontal and is ready for mating with the upper stage (foreground). DART was designed and built for NASA by Orbital Sciences Corporation as an advanced flight demonstrator to locate and maneuver near an orbiting satellite. DART weighs about 800 pounds and is nearly 6 feet long and 3 feet in diameter. The Orbital Sciences Pegasus XL will launch DART into a circular polar orbit of approximately 475 miles. DART is designed to demonstrate technologies required for a spacecraft to locate and rendezvous, or maneuver close to, other craft in space. Results from the DART mission will aid in the development of NASA’s Crew Exploration Vehicle and will also assist in vehicle development for crew transfer and crew rescue capability to and from the International Space Station.

  12. KSC-04pd1825

    NASA Image and Video Library

    2004-09-02

    KENNEDY SPACE CENTER, FLA. - At Vandenberg Air Force Base in California, the Demonstration of Autonomous Rendezvous Technology (DART) spacecraft (right) is ready for mating with the upper stage (behind it) in preparation for launch on the Orbital Sciences Pegasus XL. DART was designed and built for NASA by Orbital Sciences Corporation as an advanced flight demonstrator to locate and maneuver near an orbiting satellite. DART weighs about 800 pounds and is nearly 6 feet long and 3 feet in diameter. The Pegasus XL will launch DART into a circular polar orbit of approximately 475 miles. DART is designed to demonstrate technologies required for a spacecraft to locate and rendezvous, or maneuver close to, other craft in space. Results from the DART mission will aid in the development of NASA’s Crew Exploration Vehicle and will also assist in vehicle development for crew transfer and crew rescue capability to and from the International Space Station.

  13. KSC-04pd1821

    NASA Image and Video Library

    2004-09-01

    KENNEDY SPACE CENTER, FLA. - At Vandenberg Air Force Base in California, the Demonstration of Autonomous Rendezvous Technology (DART) spacecraft is ready for mating with the upper stage of the Orbital Sciences Pegasus XL behind it (right). DART was designed and built for NASA by Orbital Sciences Corporation as an advanced flight demonstrator to locate and maneuver near an orbiting satellite. DART weighs about 800 pounds and is nearly 6 feet long and 3 feet in diameter. The Pegasus XL will launch DART into a circular polar orbit of approximately 475 miles. DART is designed to demonstrate technologies required for a spacecraft to locate and rendezvous, or maneuver close to, other craft in space. Results from the DART mission will aid in the development of NASA’s Crew Exploration Vehicle and will also assist in vehicle development for crew transfer and crew rescue capability to and from the International Space Station.

  14. Design verification and fabrication of active control systems for the DAST ARW-2 high aspect ratio wing. Part 2: Appendices

    NASA Technical Reports Server (NTRS)

    Mcgehee, C. R.

    1986-01-01

    This is Part 2-Appendices of a study conducted under Drones for Aerodynamic and Structural Testing (DAST) Program to accomplish the final design and hardware fabrication for four active control systems compatible with and ready for installation in the NASA Aeroelastic Research Wing No. 2 (ARW-2) and Firebee II drone flight test vehicle. The wing structure was designed so that Active Control Systems (ACS) are required in the normal flight envelope by integrating control system design with aerodynamics and structure technologies. The DAST ARW-2 configuration uses flutter suppression, relaxed static stability, and gust and maneuver load alleviation ACS systems, and an automatic flight control system. Performance goals and criteria were applied to individual systems and the systems collectively to assure that vehicle stability margins, flutter margins, flying qualities, and load reductions were achieved.

  15. Micropellets coated with Kollicoat® Smartseal 30D for taste masking in liquid oral dosage forms.

    PubMed

    Dashevskiy, Andriy; Mohylyuk, Valentyn; Ahmed, Abid Riaz; Kolter, Karl; Guth, Felicitas; Bodmeier, Roland

    2017-09-01

    The objective of this study was to develop delivery systems for taste masking based on multiparticulates coated with Kollicoat ® Smartseal 30D formulated as liquid oral suspensions. Coating of particles containing bitter drugs with Kollicoat ® Smartseal reduced drug leaching into aqueous medium, especially when increasing pH, therefore can be used for the formulation of liquid dosage forms. Application of an intermediate layer of ion exchange resins between drug layer and coating can further decrease drug leaching into aqueous vehicle that is beneficial in terms of taste masking. Using optimized compositions of liquid vehicles such as addition of sugar alcohols and ion exchange resin, reconstitutable or ready-to-use liquid dosage forms with micropellets can be developed with bitter taste protection after redispersion lasting longer than 3 weeks, which exceeds the usual period of application.

  16. What's Learned First, What's Learned Together? Developing a Yearlong Plan from the K-12 College and Career Ready Standards for English Language Arts and Literacy. From the College and Career Ready Standards to Teaching and Learning in the Classroom: A Series of Resources for Teachers. Updated August 2015

    ERIC Educational Resources Information Center

    Mancevice, Nicole; Lozano, Maritza; Jones, Barbara; Tobiason, Glory; Heritage, Margaret; Chang, Sandy; Herman, Joan

    2015-01-01

    This resource is part of a series produced by the Center for Standards and Assessment Implementation (CSAI) to assist educators as they use College and Career Ready Standards (CCRS) to plan instruction for diverse learners. Although the processes described in this resource use the Common Core State Standards (CCSS; National Governors Association…

  17. Occurrence of hepatitis A and E and norovirus GI and GII in ready-to-eat vegetables in Italy.

    PubMed

    Terio, V; Bottaro, M; Pavoni, E; Losio, M N; Serraino, A; Giacometti, F; Martella, V; Mottola, A; Di Pinto, A; Tantillo, G

    2017-05-16

    Fresh vegetables and their ready-to-eat (RTE) salads have become increasingly recognized as potential vehicles for foodborne diseases. The EU Reg. 1441/2007 establishes microbiological criteria for bacterial pathogens for products placed on the market during their shelf-life (i.e. Salmonella spp., Listeria monocytogenes) for pre-cut fruits and vegetables (RTE) whilst it does not address the problem of contamination by enteric viruses. In this study we investigated the contamination by hepatitis A virus (HAV), hepatitis E virus (HEV) and norovirus (NoV) in 911 ready-to-eat vegetable samples taken from products at retail in Apulia and in Lombardia. The vegetable samples were tested using validated real-time PCR (RT-qPCR) assays, ISO standardized virological methods and ISO culturing methods for bacteriological analysis. The total prevalence of HAV and HEV was 1.9% (18/911) and 0.6% (6/911), respectively. None of the samples analysed in this study was positive for NoV, Salmonella spp. or Listeria monocytogenes. The detection of HAV and HEV in RTE salads highlights a risk to consumers and the need to improve production hygiene. Appropriate implementation of hygiene procedures is required at all the steps of the RTE vegetable production chain and this should include monitoring of emerging viral pathogens. Copyright © 2017. Published by Elsevier B.V.

  18. Physician-based activity counseling: intervention effects on mediators of motivational readiness for physical activity.

    PubMed

    Pinto, B M; Lynn, H; Marcus, B H; DePue, J; Goldstein, M G

    2001-01-01

    In theory-based interventions for behavior change, there is a need to examine the effects of interventions on the underlying theoretical constructs and the mediating role of such constructs. These two questions are addressed in the Physically Active for Life study, a randomized trial of physician-based exercise counseling for older adults. Three hundred fifty-five patients participated (intervention n = 181, control n = 174; mean age = 65.6 years). The underlying theories used were the Transtheoretical Model, Social Cognitive Theory and the constructs of decisional balance (benefits and barriers), self-efficacy, and behavioral and cognitive processes of change. Motivational readiness for physical activity and related constructs were assessed at baseline, 6 weeks, and 8 months. Linear or logistic mixed effects models were used to examine intervention effects on the constructs, and logistic mixed effects models were used for mediator analyses. At 6 weeks, the intervention had significant effects on decisional balance, self-efficacy, and behavioral processes, but these effects were not maintained at 8 months. At 6 weeks, only decisional balance and behavioral processes were identified as mediators of motivational readiness outcomes. Results suggest that interventions of greater intensity and duration may be needed for sustained changes in mediators and motivational readiness for physical activity among older adults.

  19. Increasing the Career Choice Readiness of Young Adolescents: An Evaluation Study

    ERIC Educational Resources Information Center

    Hirschi, Andreas; Lage, Damian

    2008-01-01

    A career workshop that applies models of the Cognitive Information Processing Approach (Sampson, Reardon, Peterson, & Lenz, 2004) and incorporates critical ingredients (Brown and Ryan Krane, 2000) to promote the career choice readiness of young adolescents was developed and evaluated with 334 Swiss students in seventh grade applying a Solomon…

  20. Student Perceptions of Personalised Learning: Development and Validation of a Questionnaire with Regional Secondary Students

    ERIC Educational Resources Information Center

    Waldrip, Bruce; Cox, Peter; Deed, Craig; Dorman, Jeffrey; Edwards, Debra; Farrelly, Cathleen; Keeffe, Mary; Lovejoy, Valeria; Mow, Lucy; Prain, Vaughan; Sellings, Peter; Yager, Zali

    2014-01-01

    This project sought to evaluate regional students' perceptions of their readiness to learn, assessment processes, engagement, extent to which their learning is personalised and to relate these to academic efficacy, academic achievement, and student well-being. It also examined teachers' perceptions of students' readiness to learn, the assessment…

  1. HIPAA Readiness Collaborative in Hawaii.

    PubMed

    Chun, Marva; Forbes, Susan; Gose, Steven; Kumabe, Brenda; Loo, Jeffrey; Nichols, Lorraine; Rosa, Luis; Sherrill, Laura; Turner, Jim

    2002-01-01

    The vision of Hawaii's HIPAA Readiness Collaborative (HRC) effort is to realize the positive potential of HIPAA through a collaborative process that engages the entire healthcare delivery system. Goals include reducing the cost of healthcare through streamlining, reducing the cost of HIPAA implementation for HRC participants, and improving the interoperability between facilities through use of standard technologies.

  2. Emotional, Cognitive and Self-Enhancement Processes in Aggressive Behavior After Interpersonal Rejection and Exclusion.

    PubMed

    Rajchert, Joanna

    2015-11-01

    The relationship between exclusion or rejection and aggression is already well documented, but there is still a debate about the mechanisms that underlie this effect. In two studies we focused on the propensity to react aggressively (readiness for aggression) on the bases of emotional, cognitive or self-enhancement (personality-immanent) processes. In both studies we first measured readiness for aggression and then ego-depleted participants. Next, in Study 1 we excluded participants (n = 96) using an online ball throwing game and measured displaced aggressive behavior - intensity and duration of an unpleasant noise administrated to a stranger. In Study 2 participants (n = 140) were rejected by a peer on the basis of an interview that they gave and then could retaliate by reducing peer's chance for getting a job. The results show that exclusion effect on displaced aggression was moderated by cognitive readiness for aggression, while rejection effect on retaliatory aggression was shaped by emotional and personality-immanent readiness for aggression as well as ego-depletion. The results were discussed in light of the strength model of self-control by Baumeister, Vohs, and Tice (2007).

  3. Measures of readiness for cognitive behavioural therapy in people with intellectual disability: A systematic review.

    PubMed

    Stott, Joshua; Charlesworth, Georgina; Scior, Katrina

    2017-01-01

    Cognitive behavioural therapy (CBT) is a promising treatment for mental health problems in people with intellectual disabilities but some may not be suited or ready. This review critically evaluates the quality and utility of measures of CBT readiness in people with intellectual disabilities. Twelve studies of six measures based on three aspects of CBT readiness were identified through systematic review. Across measures, measurement quality was largely poor or un-assessed. Only one study evaluated measurement change over the course of CBT. Not all participants with intellectual disabilities could 'pass' readiness measures and performance may be affected by levels of language and cognitive functioning. There was some evidence that CBT readiness is trainable with brief interventions. Before using readiness measures in a clinical context, further work is needed to extend initial evidence on recognising cognitive mediation as a CBT readiness ability. Given the lack of consensus as to the definition of CBT readiness and the heterogeneity of CBT interventions, future research could also focus on developing readiness measures using a bottom up approach, developing measures within the context of CBT interventions themselves, before further refining and establishing their psychometric properties. This paper is the first to systematically review measures of skills thought necessary to be ready for cognitive behavioural therapy in intellectual disabilities. The findings suggest that while readiness skills may be trainable with brief interventions, the available measures of these skills have not been fully evaluated for quality. Levels of functioning on these measures have yet to be established relative to those without intellectual disabilities and critically, there is very little evidence as to whether these skills are important in cognitive behavioural therapy process and outcome. We suggest that future research could focus on those constructs where there is preliminary evidence for utility such as recognising cognitive mediation and also on developing the concept of readiness perhaps by developing measures within the context of specific CBT interventions. Until this is done, clinicians should exercise caution in using these measures to assess readiness for cognitive behavioural therapy in people with intellectual disabilities. Copyright © 2016 Elsevier Ltd. All rights reserved.

  4. The NASA Integrated Vehicle Health Management Technology Experiment for X-37

    NASA Technical Reports Server (NTRS)

    Schwabacher, Mark; Samuels, Jeff; Brownston, Lee; Clancy, Daniel (Technical Monitor)

    2002-01-01

    The NASA Integrated Vehicle Health Management (IVHM) Technology Experiment for X-37 was intended to run IVHM software on-board the X-37 spacecraft. The X-37 is intended to be an unpiloted vehicle that would orbit the Earth for up to 21 days before landing on a runway. The objectives of the experiment were to demonstrate the benefits of in-flight IVHM to the operation of a Reusable Launch Vehicle, to advance the Technology Readiness Level of this IVHM technology within a flight environment, and to demonstrate that the IVHM software could operate on the Vehicle Management Computer. The scope of the experiment was to perform real-time fault detection and isolation for X-37's electrical power system and electro-mechanical actuators. The experiment used Livingstone, a software system that performs diagnosis using a qualitative, model-based reasoning approach that searches system-wide interactions to detect and isolate failures. Two of the challenges we faced were to make this research software more efficient so that it would fit within the limited computational resources that were available to us on the X-37 spacecraft, and to modify it so that it satisfied the X-37's software safety requirements. Although the experiment is currently unfunded, the development effort had value in that it resulted in major improvements in Livingstone's efficiency and safety. This paper reviews some of the details of the modeling and integration efforts, and some of the lessons that were learned.

  5. Constraining movement alters the recruitment of motor processes in mental rotation.

    PubMed

    Moreau, David

    2013-02-01

    Does mental rotation depend on the readiness to act? Recent evidence indicates that the involvement of motor processes in mental rotation is experience-dependent, suggesting that different levels of expertise in sensorimotor interactions lead to different strategies to solve mental rotation problems. Specifically, experts in motor activities perceive spatial material as objects that can be acted upon, triggering covert simulation of rotations. Because action simulation depends on the readiness to act, movement restriction should therefore disrupt mental rotation performance in individuals favoring motor processes. In this experiment, wrestlers and non-athletes judged whether pairs of three-dimensional stimuli were identical or different, with their hands either constrained or unconstrained. Wrestlers showed higher performance than controls in the rotation of geometric stimuli, but this difference disappeared when their hands were constrained. However, movement restriction had similar consequences for both groups in the rotation of hands. These findings suggest that expert's advantage in mental rotation of abstract objects is based on the readiness to act, even when physical manipulation is impossible.

  6. Readiness factors for lean implementation in healthcare settings--a literature review.

    PubMed

    Al-Balushi, S; Sohal, A S; Singh, P J; Al Hajri, A; Al Farsi, Y M; Al Abri, R

    2014-01-01

    The purpose of this paper is to determine the readiness factors that are critical to the application and success of lean operating principles in healthcare organizations through a review of relevant literature. A comprehensive review of literature focussing on lean and lean healthcare was conducted. Leadership, organizational culture, communication, training, measurement, and reward systems are all commonly attributed readiness factors throughout general change management and lean literature. However, directly related to the successful implementation of lean in healthcare is that a setting is able to authorize a decentralized management style and undertake an end-to-end process view. These can be particularly difficult initiatives for complex organizations such as healthcare settings. The readiness factors identified are based on a review of the published literature. The external validity of the findings could be enhanced if tested using an empirical study. The readiness factors identified will enable healthcare practitioners to be better prepared as they begin their lean journeys. Sustainability of the lean initiative will be at stake if these readiness factors are not addressed. To the best of the knowledge, this is the first paper that provides a consolidated list of key lean readiness factors that can guide practice, as well as future theory and empirical research.

  7. Aerocapture Technology Development for Planetary Science - Update

    NASA Technical Reports Server (NTRS)

    Munk, Michelle M.

    2006-01-01

    Within NASA's Science Mission Directorate is a technological program dedicated to improving the cost, mass, and trip time of future scientific missions throughout the Solar System. The In-Space Propulsion Technology (ISPT) Program, established in 2001, is charged with advancing propulsion systems used in space from Technology Readiness Level (TRL) 3 to TRL6, and with planning activities leading to flight readiness. The program's content has changed considerably since inception, as the program has refocused its priorities. One of the technologies that has remained in the ISPT portfolio through these changes is Aerocapture. Aerocapture is the use of a planetary body's atmosphere to slow a vehicle from hyperbolic velocity to a low-energy orbit suitable for science. Prospective use of this technology has repeatedly shown huge mass savings for missions of interest in planetary exploration, at Titan, Neptune, Venus, and Mars. With launch vehicle costs rising, these savings could be the key to mission viability. This paper provides an update on the current state of the Aerocapture technology development effort, summarizes some recent key findings, and highlights hardware developments that are ready for application to Aerocapture vehicles and entry probes alike. Description of Investments: The Aerocapture technology area within the ISPT program has utilized the expertise around NASA to perform Phase A-level studies of future missions, to identify technology gaps that need to be filled to achieve flight readiness. A 2002 study of the Titan Explorer mission concept showed that the combination of Aerocapture and a Solar Electric Propulsion system could deliver a lander and orbiter to Titan in half the time and on a smaller, less expensive launch vehicle, compared to a mission using chemical propulsion for the interplanetary injection and orbit insertion. The study also identified no component technology breakthroughs necessary to implement Aerocapture on such a mission. Similar studies of Aerocapture applications at Neptune, Venus, and Mars were studied in 2003 through 2005. All showed significant performance improvements for the missions studied. Findings from these studies were used to guide the technology development tasks originally solicited in a 2002 NASA ROSS Research Announcement. The tasks are now in their final year and have provided numerous improvements in modeling and hardware, for use in proposals or new mission starts. Major Accomplishments: Since validation of the Aerocapture maneuver requires a space flight, ground developments have focused on modeling and environment prediction, materials, and sensors. Lockheed Martin has designed and built a 2-meter Carbon-Carbon aeroshell "hot structure." The article utilizes co-cured stiffening ribs and advanced insulation to achieve large scale, and up to a 40% reduction in areal density over the Genesis probe construction. This concept would be an efficient solution for probes that experience heat rates near 800-1000 W/cm(exp 2), such as at Venus and Earth. Applied Research Associates has extensively tested a family of efficient ablative TPS materials that provide solutions for a range of heating conditions. These materials are being applied to high-temperature structures built by ATK Space Systems, led by Langley Research Center. One-meter aeroshells will be thermally tested to validate construction and demonstrate higher bondline temperatures, which can lead to mass savings of up to 30% over traditional heatshields. Ames Research Center has developed aeroshell instrumentation that could measure environmental conditions and material performance during atmospheric entry. Instruments to measure TPS recession, heat flux, and catalycity could be combined with traditional sensors to provide a "plug-and-play" system for minimal mass and power, that would acquire flight data for model improvement and risk reduction on future missions. Improved atmospheric and aerothermodynamic models ha also been a major focus of the program. Next Steps: Aerocapture is one of five technologies in competition for a flight validation opportunity through the New Millennium Program. If selected, a fully autonomous vehicle will perform an Aerocapture at Earth in 2010, and flight data will be used to validate the guidance system and the TPS material for science mission infusion.

  8. Concept of economic readiness levels assessment

    NASA Astrophysics Data System (ADS)

    Yuniaristanto, Sutopo, W.; Widiyanto, A.; Putri, A. S.

    2017-11-01

    This research aims to build a concept of Economic Readiness Level (ERL) assessment for incubation center. ERL concept is arranged by considering both market and business aspects. Every aspect is divided into four phases and each of them consists of some indicators. Analytic Hierarchy Process (AHP) is used to develop the ERL in calculating the weight of every single aspect and indicator. Interval scale between 0 and 4 is also applied in indicator assessment. In order to calculate ERL, score in every indicator and the weight of both the aspect and indicator are considered. ERL value is able to show in detail the innovative product readiness level from economic sight, market and business aspect. There are four levels in Economic Readiness Level scheme which are investigation, feasibility, planning and introduction.

  9. Fertility in The Netherlands as an expected value process and developmental readiness.

    PubMed

    Taris, T W

    1998-01-01

    In this 2-wave panel study, the decision to have children was examined in the context of Feather's (1982) expectancy-value model among a representative sample of 288 childless Dutch adults aged 18-30 years. The effects of 2 indicators of developmental readiness (age and duration of relationship) were also explored. It was expected that (a) the likelihood of having a baby would increase as a function of intentions, evaluations of being childless, and expected rewards of having children and (b) developmental readiness would be positively related to whether respondents had children at the 2nd wave of the study. Structural equation modeling was used. The results largely supported expectations. Developmental readiness affected fertility both directly and indirectly via the expected rewards of having children.

  10. Evaluation of a Brazilian Postgraduate Dental Program by the Dundee Ready Educational Environment Measure

    ERIC Educational Resources Information Center

    do Vale Placa, Rebeca; Ragghianti Zangrando, Mariana S.; Sant'Ana, Adriana C. P.; Greghi, Sebastião L. A.; de Rezende, Maria Lucia R.; Damante, Carla A.

    2015-01-01

    The evaluation of education environment is essential to provide to the professors a better understanding of the teaching process. One valuable tool for this assessment is the Dundee Ready Educational Environment Measure (DREEM). This questionnaire has 50 questions and is divided in five dimensions: D1--Perceptions of teaching, D2--Perceptions of…

  11. The Validation of the Caretaker Readiness Questionnaire: Factors Related to Caretaker Knowledge and Opinions of Exceptional Student Education Services

    ERIC Educational Resources Information Center

    Wimes, Cassaundra T.

    2009-01-01

    This study sought to validate measures of caretaker readiness to facilitate meaningful participation in the Exceptional Student Education (ESE) educational decision-making process. School districts have encountered great difficulty in achieving the federal standards for meaningful participation in educational decision making due to a lack of…

  12. Interrelation of Evaluation and Self-Evaluation in the Diagnostic Procedures to Assess Teachers' Readiness for Innovation

    ERIC Educational Resources Information Center

    Tyunnikov, Yurii S.

    2016-01-01

    The paper solves the problem of the relationship of external diagnosis and self-diagnosis of readiness of teachers to innovative activity. It highlights major disadvantages of measurement tools that are used to this process. The author demonstrates an alternative approach to harmonizing the diagnosis, based on a modular diagnostic model, general…

  13. Reliability of Bracken School Readiness Assessment, Third Edition Scores with Young Children in Mumbai, India

    ERIC Educational Resources Information Center

    Shah, Mira B.; Schaefer, Barbara A.; Clark, Teresa P.

    2013-01-01

    To effectively provide early interventions to children, identifying those who are in need of these interventions is essential. In India, several problems hinder the process of early identification, including a lack of standardized measures for assessment. This study investigates the utility of the Bracken School Readiness Assessment, Third Edition…

  14. Students' Readiness for E-Learning: A Case Study of Sukhothai Thammathirat Open University, Thailand

    ERIC Educational Resources Information Center

    Tuntirojanawong, Suttiwan

    2013-01-01

    The process of e-learning is the operations that involve humans, computers, the Internet, and instructional material, and that produces the outputs to learners and the organization. The purposes of this research were (1) to study students' readiness for e-learning of graduate students majoring in educational administration, School of Educational…

  15. Maternal Mind-Mindedness and Children's School Readiness: A Longitudinal Study of Developmental Processes

    ERIC Educational Resources Information Center

    Bernier, Annie; McMahon, Catherine A.; Perrier, Rachel

    2017-01-01

    This study aimed to test a 5-wave sequential mediation model linking maternal mind-mindedness during infancy to children's school readiness in kindergarten through a serial mediation involving child language and effortful control in toddlerhood and the preschool years. Among a sample of 204 mother-child dyads, we assessed maternal mind-mindedness…

  16. Antismoking Threat and Efficacy Appeals: Effects on Smoking Cessation Intentions for Smokers with Low and High Readiness to Quit

    PubMed Central

    Wong, Norman C. H.; Cappella, Joseph N.

    2009-01-01

    This study examined the effects of sequencing different types of antismoking threat and efficacy appeals on smoking cessation intentions for smokers with low and high levels of readiness to quit. An experiment was done to test predictions based on Witte's (1992) Extended Parallel Process Model and research by Cho and Salmon (2006). A national probability sample of 555 adult smokers was recruited to take part in this study. Results found a positive two-way interaction effect between message threat and perceived level of message efficacy on intentions to seek help for quitting. A three-way interaction effect was found between message threat, perceived level of message efficacy, and readiness to quit on quitting intentions. Both threat and efficacy were important for smokers with low readiness to quit, whereas efficacy was most important among smokers with high readiness to quit. Implications of the results for antismoking campaigns are discussed along with limitations and future directions. PMID:20046966

  17. New Developments in the Technology Readiness Assessment Process in US DOE-EM - 13247

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Krahn, Steven; Sutter, Herbert; Johnson, Hoyt

    2013-07-01

    A Technology Readiness Assessment (TRA) is a systematic, metric-based process and accompanying report that evaluates the maturity of the technologies used in systems; it is designed to measure technology maturity using the Technology Readiness Level (TRL) scale pioneered by the National Aeronautics and Space Administration (NASA) in the 1980's. More recently, DoD has adopted and provided systematic guidance for performing TRAs and determining TRLs. In 2007 the GAO recommended that the DOE adopt the NASA/DoD methodology for evaluating technology maturity. Earlier, in 2006-2007, DOE-EM had conducted pilot TRAs on a number of projects at Hanford and Savannah River. In Marchmore » 2008, DOE-EM issued a process guide, which established TRAs as an integral part of DOE-EM's Project Management Critical Decision Process. Since the development of its detailed TRA guidance in 2008, DOE-EM has continued to accumulate experience in the conduct of TRAs and the process for evaluating technology maturity. DOE has developed guidance on TRAs applicable department-wide. DOE-EM's experience with the TRA process, the evaluations that led to recently developed proposed revisions to the DOE-EM TRA/TMP Guide; the content of the proposed changes that incorporate the above lessons learned and insights are described. (authors)« less

  18. Study of the Technical Feasibility of Increasing the Amount of Recycled Concrete Waste Used in Ready-Mix Concrete Production

    PubMed Central

    Ferreiro-Cabello, Javier; López-González, Luis M.

    2017-01-01

    The construction industry generates a considerable amount of waste. Faced with this undesirable situation, the ready-mix concrete sector, in particular, has invested energy and resources into reusing its own waste in its production process as it works towards the goal of more sustainable construction. This study examines the feasibility of incorporating two types of concrete waste, which currently end up in landfill, into the production process of ready-mix concrete: the waste generated during the initial production stage (ready-mix concrete waste), and waste created when demolition waste is treated to obtain artificial aggregate. The first phase of the study’s methodology corroborates the suitability of the recycled aggregate through characterization tests. After this phase, the impact of incorporating different percentages of recycled coarse aggregate is evaluated by examining the performance of the produced concrete. The replacement rate varied between 15% and 50%. The results indicate that recycled aggregates are, indeed, suitable to be incorporated into ready-mix concrete production. The impact on the final product’s performance is different for the two cases examined herein. Incorporating aggregates from generic concrete blocks led to a 20% decrease in the produced concrete’s strength performance. On the other hand, using recycled aggregates made from the demolition waste led to a smaller decrease in the concrete’s performance: about 8%. The results indicate that with adequate management and prior treatment, the waste from these plants can be re-incorporated into their production processes. If concrete waste is re-used, concrete production, in general, becomes more sustainable for two reasons: less waste ends up as landfill and the consumption of natural aggregates is also reduced. PMID:28773183

  19. Study of the Technical Feasibility of Increasing the Amount of Recycled Concrete Waste Used in Ready-Mix Concrete Production.

    PubMed

    Fraile-Garcia, Esteban; Ferreiro-Cabello, Javier; López-Ochoa, Luis M; López-González, Luis M

    2017-07-18

    The construction industry generates a considerable amount of waste. Faced with this undesirable situation, the ready-mix concrete sector, in particular, has invested energy and resources into reusing its own waste in its production process as it works towards the goal of more sustainable construction. This study examines the feasibility of incorporating two types of concrete waste, which currently end up in landfill, into the production process of ready-mix concrete: the waste generated during the initial production stage (ready-mix concrete waste), and waste created when demolition waste is treated to obtain artificial aggregate. The first phase of the study's methodology corroborates the suitability of the recycled aggregate through characterization tests. After this phase, the impact of incorporating different percentages of recycled coarse aggregate is evaluated by examining the performance of the produced concrete. The replacement rate varied between 15% and 50%. The results indicate that recycled aggregates are, indeed, suitable to be incorporated into ready-mix concrete production. The impact on the final product's performance is different for the two cases examined herein. Incorporating aggregates from generic concrete blocks led to a 20% decrease in the produced concrete's strength performance. On the other hand, using recycled aggregates made from the demolition waste led to a smaller decrease in the concrete's performance: about 8%. The results indicate that with adequate management and prior treatment, the waste from these plants can be re-incorporated into their production processes. If concrete waste is re-used, concrete production, in general, becomes more sustainable for two reasons: less waste ends up as landfill and the consumption of natural aggregates is also reduced.

  20. Adaptive Augmenting Control Flight Characterization Experiment on an F/A-18

    NASA Technical Reports Server (NTRS)

    VanZwieten, Tannen S.; Gilligan, Eric T.; Wall, John H.; Orr, Jeb S.; Miller, Christopher J.; Hanson, Curtis E.

    2014-01-01

    The NASA Marshall Space Flight Center (MSFC) Flight Mechanics and Analysis Division developed an Adaptive Augmenting Control (AAC) algorithm for launch vehicles that improves robustness and performance by adapting an otherwise welltuned classical control algorithm to unexpected environments or variations in vehicle dynamics. This AAC algorithm is currently part of the baseline design for the SLS Flight Control System (FCS), but prior to this series of research flights it was the only component of the autopilot design that had not been flight tested. The Space Launch System (SLS) flight software prototype, including the adaptive component, was recently tested on a piloted aircraft at Dryden Flight Research Center (DFRC) which has the capability to achieve a high level of dynamic similarity to a launch vehicle. Scenarios for the flight test campaign were designed specifically to evaluate the AAC algorithm to ensure that it is able to achieve the expected performance improvements with no adverse impacts in nominal or nearnominal scenarios. Having completed the recent series of flight characterization experiments on DFRC's F/A-18, the AAC algorithm's capability, robustness, and reproducibility, have been successfully demonstrated. Thus, the entire SLS control architecture has been successfully flight tested in a relevant environment. This has increased NASA's confidence that the autopilot design is ready to fly on the SLS Block I vehicle and will exceed the performance of previous architectures.

  1. KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, STS-114 Mission Specialist Wendy Lawrence looks at an reinforced carbon-carbon panel ready to be installed on Atlantis. Lawrence is a new addition to the mission crew, who are at KSC to take part in crew equipment and orbiter familiarization.

    NASA Image and Video Library

    2003-10-30

    KENNEDY SPACE CENTER, FLA. - In the Orbiter Processing Facility, STS-114 Mission Specialist Wendy Lawrence looks at an reinforced carbon-carbon panel ready to be installed on Atlantis. Lawrence is a new addition to the mission crew, who are at KSC to take part in crew equipment and orbiter familiarization.

  2. U.S. Transportation Command Needs Further Improvements to Address Performance Concerns Over the Global Privately Owned Vehicle Contract 3

    DTIC Science & Technology

    2016-02-03

    required vehicles be covered, locked , and stored in accordance with standard commercial practices. Specifically, numerous leaks were present...Vehicle Processing Center and storage facility, Dallas , Texas; • Vehicle Processing Center, St. Louis, Missouri; • Vehicle Processing Center, Charleston...vehicles did not require covers and were not required to be locked based on authorized directives from the contracting officer. He also stated that

  3. STS-98 U.S. Lab Destiny is moved out of Atlantis' payload bay

    NASA Technical Reports Server (NTRS)

    2001-01-01

    KENNEDY SPACE CENTER, Fla. -- The U.S. Lab Destiny is ready to be moved from Atlantis''' payload bay into the Payload Changeout Room. After the move, Atlantis will roll back to the Vehicle Assembly Building to allow workers to conduct inspections, continuity checks and X-ray analysis on the 36 solid rocket booster cables located inside each booster'''s system tunnel. An extensive evaluation of NASA'''s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis.

  4. 8-Meter UV/Optical Space Telescope

    NASA Technical Reports Server (NTRS)

    Stahl, H. Philip

    2008-01-01

    This slide presentation proposes using the unprecedented capability of the planned Ares V launch vehicle, to place a 8 meter monolithic space telescope at the Earth-Sun L2 point. This new capability enables a new design pardigm -- simplicity. The six to eight meter class telescope with a massive high Technical Readiness Level ground observatory class monolithic primary mirror has been determined feasible. The proposed design, structural analysis, spacecraft design and shroud integration, thermal analysis, propulsion system, guidance navigation and pointing control assumptions about the avionics, and power systems, operational lifetime, and the idea of in-space servicing are reviewed.

  5. L-8: Non-Venting Thermal Control Systems for Space Vehicles: Boilerplate

    NASA Technical Reports Server (NTRS)

    Smith, Fred; Massina, Chris

    2016-01-01

    We are sharpening our focus on Human Space Flight (HSF) Exploration Beyond Low Earth Orbit. We want to ensure that HSF technologies are ready to take Humans to Mars in the 2030's. Various Roadmaps define the needed technologies. We are attempting to define our activities and dependencies. Our Goal: Get within 8 years of launching humans to Mars (L-8) by 2025. Develop and Mature the technologies and systems needed. Develop and Mature the personnel needed. We need collaborators to make it happen, and we think they can benefit by working with us.

  6. Rare view of two space shuttles on adjacent KSC Launch Complex (LC) 39 pads

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Rare view shows two space shuttles on adjacent Kennedy Space Center (KSC) Launch Complex (LC) 39 pads with the Rotating Service Structures (RSS) retracted. STS-35 Columbia, Orbiter Vehicle (OV) 102, is on Pad A (foreground) is being readied for a September 6 early morning launch, while its sister spaceship, Discovery, OV-103, is set to begin preparations for an October liftoff on Mission STS-41. View provided by KSC with alternate number KSC-90PC-1269. Also see S90-48650 for similar view with alternate KSC number KSC-90PC-1268.

  7. Rare view of two space shuttles on adjacent KSC Launch Complex (LC) 39 pads

    NASA Technical Reports Server (NTRS)

    1990-01-01

    Rare view shows two space shuttles on adjacent Kennedy Space Center (KSC) Launch Complex (LC) 39 pads with the Rotating Service Structures (RSS) retracted. STS-35 Columbia, Orbiter Vehicle (OV) 102, is on Pad A (foreground) and being readied for a September 6 early morning launch, while its sister spaceship, Discovery, OV-103, is prepared for an October liftoff on Mission STS-41. View provided by KSC with alternate number KSC-90PC-1268. Also see S90-48904 for a similar view with alternate KSC number KSC-90PC-1269.

  8. STS-73 Cmdr Kenneth D. Bowersox arrives at SLF

    NASA Technical Reports Server (NTRS)

    1995-01-01

    STS-73 Mission Commander Kenneth D. Bowersox arrives at KSC's Shuttle Landing Facility (SLF), ready to fly one spaceship into orbit as another vehicle is prepared for a different destination behind him. Bowersox and his six-member crew flew into KSC just hours after the countdown clock began ticking toward a scheduled liftoff of the Space Shuttle Columbia from Pad 39B at 9:35 a.m EDT, Sept. 28. The orbiter Discovery was towed to the SLF for a cross-country trip to the West Coast and a regularly scheduled refurbishment and checkout period.

  9. KSC-00pp1622

    NASA Image and Video Library

    2000-10-31

    KENNEDY SPACE CENTER, Fla. -- Space Shuttle Endeavour is ready to move from the Vehicle Assembly Building into the light of early morning on its rollout to Launch Pad 39B. The Space Shuttle sits atop the Mobile Launcher Platform (MLP). Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections

  10. KSC00pp1622

    NASA Image and Video Library

    2000-10-31

    KENNEDY SPACE CENTER, Fla. -- Space Shuttle Endeavour is ready to move from the Vehicle Assembly Building into the light of early morning on its rollout to Launch Pad 39B. The Space Shuttle sits atop the Mobile Launcher Platform (MLP). Endeavour is scheduled to be launched Nov. 30 at 10:01 p.m. EST on mission STS-97, the sixth construction flight to the International Space Station. Its payload includes the P6 Integrated Truss Structure and a photovoltaic (PV) module, with giant solar arrays that will provide power to the Station. The mission includes two spacewalks to complete the solar array connections

  11. STS-31 MS Sullivan poses next to stowed EMU in OV-103's airlock

    NASA Image and Video Library

    1990-04-29

    STS-31 Mission Specialist (MS) Kathryn D. Sullivan poses for a picture before beginning extravehicular mobility unit (EMU) donning procedures in the airlock of Discovery, Orbiter Vehicle (OV) 103. Sullivan will remove the lower torso restraint and don EMU which is supported on an airlock adapter plate (AAP). When suited, Sullivan will be ready for contingency extravehicular activity (EVA) in the event that problems arise with the Hubble Space Telescope (HST) deployment. Displayed on the front of the EMU are the STS-31 mission insignia and the JSC Weightless Environment Training Facility (WETF) insignia.

  12. High Speed Prototype Car Test

    NASA Image and Video Library

    2014-01-10

    CAPE CANAVERAL, Fla. - An engineer readies a Hennessey Venom GT for test runs on the 3.5-mile long runway at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The flat concrete runway is one of the few places in the world where high performance automobiles can be tested for aerodynamic and safety designs. Hennessey Performance of Sealy, Texas, worked with Performance Power Racing in West Palm Beach to arrange use of the NASA facility. Performance Power Racing has conducted numerous engineering tests on the runway with a variety of vehicles. Photo credit: NASA/Kim Shiflett

  13. High Speed Prototype Car Test

    NASA Image and Video Library

    2014-01-10

    CAPE CANAVERAL, Fla. - Mechanics, engineers and Driver Brian Smith, in jumpsuit, ready a Hennessey Venom GT for test runs on the 3.5-mile long runway at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The flat concrete runway is one of the few places in the world where high performance automobiles can be tested for aerodynamic and safety designs. Hennessey Performance of Sealy, Texas, worked with Performance Power Racing in West Palm Beach to arrange use of the NASA facility. Performance Power Racing has conducted numerous engineering tests on the runway with a variety of vehicles. Photo credit: NASA/Kim Shiflett

  14. High Speed Prototype Car Test

    NASA Image and Video Library

    2014-01-10

    CAPE CANAVERAL, Fla. - Mechanics and engineers ready a Hennessey Venom GT for test runs on the 3.5-mile long runway at the Shuttle Landing Facility at NASA's Kennedy Space Center in Florida. The flat concrete runway is one of the few places in the world where high performance automobiles can be tested for aerodynamic and safety designs. Hennessey Performance of Sealy, Texas, worked with Performance Power Racing in West Palm Beach to arrange use of the NASA facility. Performance Power Racing has conducted numerous engineering tests on the runway with a variety of vehicles. Photo credit: NASA/Kim Shiflett

  15. KSC01pp0133

    NASA Image and Video Library

    2001-01-19

    KENNEDY SPACE CENTER, FLA. -- Space Shuttle Atlantis is ready to roll back to the Vehicle Assembly Building via the crawler-transporter. In the VAB workers will conduct inspections, make continuity checks and conduct X-ray analysis on the 36 solid rocket booster cables located inside each booster’s system tunnel. An extensive evaluation of NASA’s SRB cable inventory revealed conductor damage in four (of about 200) cables on the shelf. Shuttle managers decided to prove the integrity of the system tunnel cables already on Atlantis before launching Jan. 19. The launch has been rescheduled no earlier than Feb. 6

  16. BLDG. 9A - EGRESS TRAINING - JSC

    NASA Image and Video Library

    1978-09-11

    S78-34927 (31 Aug. 1978) --- Astronaut C. Gordon Fullerton, one of a group of eight astronauts named to fly the first few orbital flight tests of the space transportation system, gets ready to participate in a training session for emergency egress from a space shuttle vehicle at the launch pad. He is wearing a USAF modified high altitude pressure garment like those to be worn by shuttle crew members at takeoff and landing. Photo credit: NASA NOTE: Since this photograph was made, astronaut C. Gordon Fullerton was named pilot of STS-3, scheduled for launch in early spring of 1982.

  17. KSC-03pd0160

    NASA Image and Video Library

    2003-01-16

    KENNEDY SPACE CENTER, FLA. - The second half of the fairing is ready to be installed on the Solar Radiation and Climate Experiment (SORCE) satellite (at right). Built by Orbital Sciences Corporation (OSC), SORCE will study and measure solar irradiance as a source of energy in the Earth's atmosphere. The launch of SORCE is scheduled for Jan. 25 at 3:14 p.m. from Cape Canaveral Air Force Station, Fla., from a Pegasus XL launch vehicle. The drop of the Pegasus will be from OSC's L-1011 aircraft at an altitude of 39,000 feet over the Atlantic Ocean approximately 100 miles east-southeast of Cape Canaveral.

  18. KSC-03pd0166

    NASA Image and Video Library

    2003-01-22

    KENNEDY SPACE CENTER, FLA. - The Pegasus XL launch vehicle, with the Solar Radiation and Climate Experiment (SORCE) satellite aboard, is ready for transfer to Cape Canaveral Air Force Station (CCAFS), Fla. Built by Orbital Sciences Corporation (OSC), SORCE will study and measure solar irradiance as a source of energy in the Earth's atmosphere. The launch of SORCE is scheduled for Jan. 25 at 3:14 p.m. from CCAFS. The drop of the Pegasus will be from OSC's L-1011 aircraft at an altitude of 39,000 feet over the Atlantic Ocean approximately 100 miles east-southeast of Cape Canaveral.

  19. KSC-03pd0167

    NASA Image and Video Library

    2003-01-22

    KENNEDY SPACE CENTER, FLA. - The Pegasus XL launch vehicle, with the Solar Radiation and Climate Experiment (SORCE) satellite aboard, is ready for transfer to Cape Canaveral Air Force Station (CCAFS), Fla. Built by Orbital Sciences Corporation (OSC), SORCE will study and measure solar irradiance as a source of energy in the Earth's atmosphere. The launch of SORCE is scheduled for Jan. 25 at 3:14 p.m. from CCAFS. The drop of the Pegasus will be from OSC's L-1011 aircraft at an altitude of 39,000 feet over the Atlantic Ocean approximately 100 miles east-southeast of Cape Canaveral.

  20. NASA's Space Launch System: An Evolving Capability for Exploration

    NASA Technical Reports Server (NTRS)

    Creech, Stephen D.; Robinson, Kimberly F.

    2016-01-01

    A foundational capability for international human deep-space exploration, NASA's Space Launch System (SLS) vehicle represents a new spaceflight infrastructure asset, creating opportunities for mission profiles and space systems that cannot currently be executed. While the primary purpose of SLS, which is making rapid progress towards initial launch readiness in two years, will be to support NASA's Journey to Mars, discussions are already well underway regarding other potential utilization of the vehicle's unique capabilities. In its initial Block 1 configuration, capable of launching 70 metric tons (t) to low Earth orbit (LEO), SLS will propel the Orion crew vehicle to cislunar space, while also delivering small CubeSat-class spacecraft to deep-space destinations. With the addition of a more powerful upper stage, the Block 1B configuration of SLS will be able to deliver 105 t to LEO and enable more ambitious human missions into the proving ground of space. This configuration offers opportunities for launching co-manifested payloads with the Orion crew vehicle, and a class of secondary payloads, larger than today's CubeSats. Further upgrades to the vehicle, including advanced boosters, will evolve its performance to 130 t in its Block 2 configuration. Both Block 1B and Block 2 also offer the capability to carry 8.4- or 10-m payload fairings, larger than any contemporary launch vehicle. With unmatched mass-lift capability, payload volume, and C3, SLS not only enables spacecraft or mission designs currently impossible with contemporary EELVs, it also offers enhancing benefits, such as reduced risk, operational costs and/or complexity, shorter transit time to destination or launching large systems either monolithically or in fewer components. This paper will discuss both the performance and capabilities of Space Launch System as it evolves, and the current state of SLS utilization planning.

  1. Is take-over time all that matters? The impact of visual-cognitive load on driver take-over quality after conditionally automated driving.

    PubMed

    Zeeb, Kathrin; Buchner, Axel; Schrauf, Michael

    2016-07-01

    Currently, development of conditionally automated driving systems which control both lateral and longitudinal vehicle guidance is attracting a great deal of attention. The driver no longer needs to constantly monitor the roadway, but must still be able to resume vehicle control if necessary. The relaxed attention requirement might encourage engagement in non-driving related secondary tasks, and the resulting effect on driver take-over is unclear. The aim of this study was to examine how engagement in three different naturalistic secondary tasks (writing an email, reading a news text, watching a video clip) impacted take-over performance. A driving simulator study was conducted and data from a total of 79 participants (mean age 40 years, 35 females) were used to examine response times and take-over quality. Drivers had to resume vehicle control in four different non-critical scenarios while engaging in secondary tasks. A control group did not perform any secondary tasks. There was no influence of the drivers' engagement in secondary tasks on the time required to return their hands to the steering wheel, and there seemed to be only little if any influence on the time the drivers needed to intervene in vehicle control. Take-over quality, however, deteriorated for distracted drivers, with drivers reading a news text and drivers watching a video deviating on average approximately 8-9cm more from the lane center. These findings seem to indicate that establishing motor readiness may be carried out almost reflexively, but cognitive processing of the situation is impaired by driver distraction. This, in turn, appears to determine take-over quality. The present findings emphasize the importance to consider both response times and take-over quality for a comprehensive understanding of factors that influence driver take-over. Furthermore, a training effect in response times was found to be moderated by the drivers' prior experience with driver assistance systems. This shows that besides driver distraction, driver-related factors influencing take-over performance exist. Copyright © 2016 Elsevier Ltd. All rights reserved.

  2. Aseptic Freeze-Dried versus Sterile Wet-Packaged Human Cadaveric Acellular Dermal Matrix in Immediate Tissue Expander Breast Reconstruction: A Propensity Score Analysis.

    PubMed

    Hanson, Summer E; Meaike, Jesse D; Selber, Jesse C; Liu, Jun; Li, Liang; Hassid, Victor J; Baumann, Donald P; Butler, Charles E; Garvey, Patrick B

    2018-05-01

    Although multiple acellular dermal matrix sources exist, it is unclear how its processing impacts complication rates. The authors compared complications between two preparations of human cadaveric acellular dermal matrix (freeze dried and ready-to-use) in immediate tissue expander breast reconstruction to analyze the effect of processing on complications. The authors retrospectively reviewed all alloplastic breast reconstructions with freeze-dried or ready-to-use human acellular dermal matrices between 2006 and 2016. The primary outcome measure was surgical-site occurrence defined as seroma, skin dehiscence, surgical-site infection, or reconstruction failure. The two groups were compared before and after propensity score matching. The authors included 988 reconstructions (freeze-dried, 53.8 percent; ready-to-use, 46.2 percent). Analysis of 384 propensity score-matched pairs demonstrated a slightly higher rate of surgical-site occurrence (21.4 percent versus 16.7 percent; p = 0.10) and surgical-site infection (9.6 percent versus 7.8 percent; p = 0.13) in the freeze-dried group than in the ready-to-use group, but the difference was not significant. However, failure was significantly higher for the freeze-dried versus ready-to-use group (7.8 percent versus 4.4 percent; p = 0.050). This is the largest study comparing the outcomes of alloplastic breast reconstruction using human acellular dermal matrix materials prepared by different methods. The authors demonstrated higher early complications with aseptic, freeze-dried matrix than with sterile ready-to-use matrix; reconstructive failure was the only outcome to achieve statistical significance. The authors conclude that acellular dermal matrix preparation has an independent impact on patient outcomes in their comparison of one company's product. Therapeutic, III.

  3. The DAWN Project's Transition to Mission Operations: on Its Way to Rendezvous with (4) Vesta and (1) Ceres

    NASA Technical Reports Server (NTRS)

    Rayman, Marc D.; Patel, Keyur C.

    2008-01-01

    Dawn launched on 27 September 2007 on a mission to orbit main belt asteroids (4) Vesta in 2011 - 2012 and (1) Ceres in 2015. The operations team conducted an extensive set of assessments of the engineering subsystems and science instruments during the first 80 days of the mission. A major objective of this period was to thrust for one week with the ion propulsion system to verify flight and ground systems readiness for typical interplanetary operations. Upon successful conclusion of the checkout phase, the interplanetary cruise phase began, most of which will be devoted to thrusting. The flexibility afforded by the use of ion propulsion enabled the project to accommodate a launch postponement of more than 3 months caused by a combination of launch vehicle and tracking system readiness, unfavorable weather, and then conflicts with other launches. Even with the shift in the launch date, all of the science objectives are retained with the same schedule and greater technical margins. This paper describes the conclusion of the development phase of the project, launch operations, and the progress of mission operations.

  4. Nationwide outbreak of Salmonella Montevideo infections associated with contaminated imported black and red pepper: warehouse membership cards provide critical clues to identify the source.

    PubMed

    Gieraltowski, L; Julian, E; Pringle, J; Macdonald, K; Quilliam, D; Marsden-Haug, N; Saathoff-Huber, L; Von Stein, D; Kissler, B; Parish, M; Elder, D; Howard-King, V; Besser, J; Sodha, S; Loharikar, A; Dalton, S; Williams, I; Barton Behravesh, C

    2013-06-01

    In November 2009, we initiated a multistate investigation of Salmonella Montevideo infections with pulsed-field gel electrophoresis pattern JIXX01.0011. We identified 272 cases in 44 states with illness onset dates ranging from 1 July 2009 to 14 April 2010. To help generate hypotheses, warehouse store membership card information was collected to identify products consumed by cases. These records identified 19 ill persons who purchased company A salami products before onset of illness. A case-control study was conducted. Ready-to-eat salami consumption was significantly associated with illness (matched odds ratio 8·5, 95% confidence interval 2·1-75·9). The outbreak strain was isolated from company A salami products from an environmental sample from one manufacturing plant, and sealed containers of black and red pepper at the facility. This outbreak illustrates the importance of using membership card information to assist in identifying suspect vehicles, the potential for spices to contaminate ready-to-eat products, and preventing raw ingredient contamination of these products.

  5. Technological changes in the healthcare sector. A method to assess change readiness.

    PubMed

    Kristensen, M; Nøhr, C

    2000-01-01

    This paper describes the theory, method and recent results of a study developing methods for assessment of change readiness. The empirical focus is on development and implementation of clinical IT systems in the Danish healthcare sector. To assess change readiness, a questionnaire has been developed. The questionnaire has been tested in a hospital department as a part of a pre analysis related to development and implementation of an IT quality assurance system. The study shows a general positive attitude to the IT system and the organisational changes, related to the implementation and use of the system. It also supplies the project organisation with specific information, useful to the project organisation to continue the essential dialogue with the healthcare professionals during the change process. Furthermore it provides a useful tool for planning the ongoing developing processes. Several other healthcare organisations are at the moment entering the study.

  6. Analysis of Teachers' Views on the Configuration of First Reading and Writing Process with Games

    ERIC Educational Resources Information Center

    Saygili, Gizem

    2013-01-01

    Problem Statement: Moving schooling age to an earlier time as a result of the transition to the practice of 12-year non-continuous compulsory education in 2012-2013 academic year has brought the discussions on whether students' readiness is sufficient or not. However, the teachers' readiness is also an issue as important as a student's readiness…

  7. 18 CFR 5.22 - Notice of acceptance and ready for environmental analysis.

    Code of Federal Regulations, 2010 CFR

    2010-04-01

    ... 18 Conservation of Power and Water Resources 1 2010-04-01 2010-04-01 false Notice of acceptance and ready for environmental analysis. 5.22 Section 5.22 Conservation of Power and Water Resources FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY REGULATIONS UNDER THE FEDERAL POWER ACT INTEGRATED LICENSE APPLICATION PROCESS § 5.22 Notice o...

  8. Training System Device Certification and Qualification Process

    DTIC Science & Technology

    2013-09-01

    Engineering IPT Integrated Product Team ISD Instructional Systems Development ISEO In-Service Engineering Office KSAs Knowledge, Skills, and Attributes...Plan TES Tactical Engagement Simulation TPM Training Pipeline Managers T&R Training and Readiness TRR Test Readiness Review TS Training System...NAWCTSD) is the Navy’s source for a full range of innovative products and services that provide complete training solutions. This includes

  9. Leading Change and Innovation in Teacher Preparation: A Blueprint for Developing TPACK Ready Teacher Candidates

    ERIC Educational Resources Information Center

    Thomas, Tommye; Herring, Mary; Redmond, Pamela; Smaldino, Sharon

    2013-01-01

    When preparing TPACK ready teacher candidates, faculty must incorporate and model TPACK within the teacher education curriculum, which often requires an ongoing change process. But for change to take place we must consider the role leadership plays in the innovation of change. Leaders, deans and department heads must be an integral part of this…

  10. Creating meaningful business continuity management programme metrics.

    PubMed

    Strong, Brian

    2010-11-01

    The popular axiom, 'what gets measured gets done', is often applied in the quality management and continuous improvement disciplines. This truism is also useful to business continuity practitioners as they continually strive to prove the value of their organisation's investment in a business continuity management (BCM) programme. BCM practitioners must also remain relevant to their organisations as executives focus on the bottom line and maintaining stakeholder confidence. It seems that executives always find a way, whether in a hallway or elevator, to ask BCM professionals about the company's level of readiness. When asked, they must be ready with an informed response. The establishment of a process to measure business continuity programme performance and organisational readiness has emerged as a key component of US Department of Homeland Security 'Voluntary Private Sector Preparedness (PS-Prep) Program' standards where the overarching goal is to improve private sector preparedness for disasters and emergencies. The purpose of this paper is two-fold: to introduce continuity professionals to best practices that should be considered when developing a BCM metrics programme as well as providing a case study of how a large health insurance company researched, developed and implemented a process to measure BCM programme performance and company readiness.

  11. Emotional, Cognitive and Self-Enhancement Processes in Aggressive Behavior After Interpersonal Rejection and Exclusion

    PubMed Central

    Rajchert, Joanna

    2015-01-01

    The relationship between exclusion or rejection and aggression is already well documented, but there is still a debate about the mechanisms that underlie this effect. In two studies we focused on the propensity to react aggressively (readiness for aggression) on the bases of emotional, cognitive or self-enhancement (personality-immanent) processes. In both studies we first measured readiness for aggression and then ego-depleted participants. Next, in Study 1 we excluded participants (n = 96) using an online ball throwing game and measured displaced aggressive behavior - intensity and duration of an unpleasant noise administrated to a stranger. In Study 2 participants (n = 140) were rejected by a peer on the basis of an interview that they gave and then could retaliate by reducing peer's chance for getting a job. The results show that exclusion effect on displaced aggression was moderated by cognitive readiness for aggression, while rejection effect on retaliatory aggression was shaped by emotional and personality-immanent readiness for aggression as well as ego-depletion. The results were discussed in light of the strength model of self-control by Baumeister, Vohs, and Tice (2007). PMID:27247687

  12. Do leafy green vegetables and their ready-to-eat [RTE] salads carry a risk of foodborne pathogens?

    PubMed

    Mercanoglu Taban, Birce; Halkman, A Kadir

    2011-12-01

    Over the past 10 years, there is an increasing demand for leafy green vegetables and their ready-to-eat (RTE) salads since people changed their eating habits because of healthier lifestyle interest. Nevertheless fresh leafy green vegetables and their RTE salads are recognized as a source of food poisoning outbreaks in many parts of the world. However, this increased proportion of outbreaks cannot be completely explained by increased consumption and enhanced surveillance of them. Both in Europe and in the USA, recent foodborne illness outbreaks have revealed links between some pathogens and some leafy green vegetables such as mostly lettuces and spinaches and their RTE salads since fresh leafy green vegetables carry the potential risk of microbiological contamination due to the usage of untreated irrigation water, inappropriate organic fertilizers, wildlife or other sources that can occur anywhere from the farm to the fork such as failure during harvesting, handling, processing and packaging. Among a wide range of pathogens causing foodborne illnesses, Escherichia coli O157:H7, Salmonella spp., and Listeria monocytogenes are the most common pathogens that contaminate leafy green vegetables. Children, the elderly, pregnant women and immunocompromised people are the most at risk for developing complications from foodborne illness as a result of eating contaminated leafy greens or their RTE salads. These outbreaks are mostly restaurant associated or they sometimes spread across several countries by international trade routes. This review summarizes current observations concerning the contaminated leafy green vegetables and their RTE salads as important vehicles for the transmission of some foodborne pathogens to humans. Copyright © 2011 Elsevier Ltd. All rights reserved.

  13. The Legacy of Space Shuttle Flight Software

    NASA Technical Reports Server (NTRS)

    Hickey, Christopher J.; Loveall, James B.; Orr, James K.; Klausman, Andrew L.

    2011-01-01

    The initial goals of the Space Shuttle Program required that the avionics and software systems blaze new trails in advancing avionics system technology. Many of the requirements placed on avionics and software were accomplished for the first time on this program. Examples include comprehensive digital fly-by-wire technology, use of a digital databus for flight critical functions, fail operational/fail safe requirements, complex automated redundancy management, and the use of a high-order software language for flight software development. In order to meet the operational and safety goals of the program, the Space Shuttle software had to be extremely high quality, reliable, robust, reconfigurable and maintainable. To achieve this, the software development team evolved a software process focused on continuous process improvement and defect elimination that consistently produced highly predictable and top quality results, providing software managers the confidence needed to sign each Certificate of Flight Readiness (COFR). This process, which has been appraised at Capability Maturity Model (CMM)/Capability Maturity Model Integration (CMMI) Level 5, has resulted in one of the lowest software defect rates in the industry. This paper will present an overview of the evolution of the Primary Avionics Software System (PASS) project and processes over thirty years, an argument for strong statistical control of software processes with examples, an overview of the success story for identifying and driving out errors before flight, a case study of the few significant software issues and how they were either identified before flight or slipped through the process onto a flight vehicle, and identification of the valuable lessons learned over the life of the project.

  14. SIMBIOS Project; 2003 Annual Report

    NASA Technical Reports Server (NTRS)

    McClain, Charles R.; Fargion, Giulietta S.

    2003-01-01

    The purpose of this technical report is to provide current documentation of the the Sensor Intercomparison and Merger for Biological and Interdisciplinary Oceanic Studies (SIMBIOS) Project activities, NASA Research Announcement (NRA) research status, satellite data processing, data product validation, and field calibration. This documentation is necessary to ensure that critical information is related to the scientific community and NASA management. This critical information includes the technical difficulties and challenges of validating and combining ocean color data from an array of independent satellite systems to form consistent and accurate global bio-optical time series products. This technical report is not meant as a substitute for scientific literature. Instead, it will provide a ready and responsive vehicle for the multitude of technical reports issued by an operational project. The SIMBIOS Science Team Principal Investigators (PIs) original contributions to this report are in chapters four and above. The purpose of these contributions is to describe the current research status of the SIMBIOS-NRA-99 funded research. The contributions are published as submitted, with the exception of minor edits to correct obvious grammatical or clerical errors.

  15. Hyperspectral imager for components identification in the atmosphere

    NASA Astrophysics Data System (ADS)

    Dewandel, Jean-Luc; Beghuin, Didier; Dubois, Xavier; Antoine, Philippe

    2017-11-01

    Several applications require the identification of chemical elements during re-entry of material in the atmosphere. The materials can be from human origin or meteorites. The Automated Transfer Vehicle (ATV) re-entry has been filmed with conventional camera from airborne manual operation. In order to permit the identification of the separate elements from their glow, spectral analysis needs to be added to the video data. In a LET-SME contract with ESA, Lambda-X has built a Fourier Transform Imaging Spectrometer to permit, in a future work, to bring the technology to the readiness level required for the application. In this paper, the principles of the Fourier Transform Imaging spectroscopy are recalled, the different interferometers suitable for supporting the technique are reviewed and the selection process is explained. The final selection of the interferometer corresponds to a birefringent prism based common path shear interferometer. The design of the breadboard and its performances are presented in terms of spatial resolution, aperture, and spectral resolution. A discussion is open regarding perspective of the technique for other remote sensing applications compared to more usual push broom configurations.

  16. Development of Inflatable Entry Systems Technologies

    NASA Technical Reports Server (NTRS)

    Player, Charles J.; Cheatwood, F. McNeil; Corliss, James

    2005-01-01

    Achieving the objectives of NASA s Vision for Space Exploration will require the development of new technologies, which will in turn require higher fidelity modeling and analysis techniques, and innovative testing capabilities. Development of entry systems technologies can be especially difficult due to the lack of facilities and resources available to test these new technologies in mission relevant environments. This paper discusses the technology development process to bring inflatable aeroshell technology from Technology Readiness Level 2 (TRL-2) to TRL-7. This paper focuses mainly on two projects: Inflatable Reentry Vehicle Experiment (IRVE), and Inflatable Aeroshell and Thermal Protection System Development (IATD). The objectives of IRVE are to conduct an inflatable aeroshell flight test that demonstrates exoatmospheric deployment and inflation, reentry survivability and stability, and predictable drag performance. IATD will continue the development of the technology by conducting exploration specific trade studies and feeding forward those results into three more flight tests. Through an examination of these projects, and other potential projects, this paper discusses some of the risks, issues, and unexpected benefits associated with the development of inflatable entry systems technology.

  17. Geohazard reconnaissance mapping for potential rock boulder fall using low altitude UAV photogrammetry

    NASA Astrophysics Data System (ADS)

    Sharan Kumar, N.; Ashraf Mohamad Ismail, Mohd; Sukor, Nur Sabahiah Abdul; Cheang, William

    2018-05-01

    This paper discusses potential applications of unmanned aerial vehicles (UAVs) for evaluation of risk immediately with photos and 3-dimensional digital element. Aerial photography using UAV ready to give a powerful technique for potential rock boulder fall recognition. High-resolution outputs from this method give the chance to evaluate the site for potential rock boulder falls spatially. The utilization of UAV to capture the aerial photos is a quick, reliable, and cost-effective technique contrasted with terrestrial laser scanning method. Reconnaissance of potential rock boulder susceptible to fall is very crucial during the geotechnical investigation. This process is essential in the view of the rock fall hazards nearby site before the beginning of any preliminary work. Photogrammetric applications have empowered the automated way to deal with identification of rock boulder susceptible to fall by recognizing the location, size, and position. A developing examination of the utilization of digital photogrammetry gives numerous many benefits for civil engineering application. These advancements have made important contributions to our capabilities to create the geohazard map on potential rock boulder fall.

  18. Are postgraduate students in distance medical education program ready for e-learning? A survey in Iran.

    PubMed

    Changiz, Tahereh; Haghani, Fariba; Nowroozi, Nasim

    2013-01-01

    Appropriate instructional design plays a crucial role in e-learning success, and analyzing learners is the cornerstone for instructional design process. Students' readiness for e-learning was assessed in the present study as an example of learner analysis for a distance course in medical education master program. A census sample of 23 students applied for distance master program on medical education, completed the "Students' E-Learning Readiness Scale" developed by Watkins, via email. The reliability and validity of the scale has been confirmed before. Average scores in total and 6 subscales were calculated. The score range was 1-5 and scores above 3 indicated good readiness. Data was interpreted using descriptive and non-parametric tests (Mann-Whitney U and Kruskal-Wallis). Response rate was 100%. The students' readiness scores in total and all subscales ("technology access", "online skills and relationships", "motivation", "online audio/video", "readiness for online discussions", and "importance of e-learning to your success") were above 3. Comparing different subscales, students' mean scores in "motivation" and "internet discussion" subscales were less than others, although the difference was not significant. There were no significant gender differences in the readiness scores. Students who were academic staff had significantly higher scores than others in total and in "motivation" and "online skills and relationship" subscales. Good learners' readiness, observed in the present study, may imply that the instructional designer can rely on e-learning strategies and build the course upon them. However, according to the slightly lower scores in "motivation" and "online discussion" subscales, it is recommended to stress more on strategies that improve these two components. To generalize the results, it is needed to test students' readiness in more different degree programs.

  19. Quality of ready to serve tilapia fish curry with PUFA in retortable pouches.

    PubMed

    Dhanapal, K; Reddy, G V S; Nayak, B B; Basu, S; Shashidhar, K; Venkateshwarlu, G; Chouksey, M K

    2010-09-01

    Studies on the physical, chemical, and microbiological qualities of fresh tilapia meat revealed its suitability for the preparation of ready to eat fish curry packed in retort pouches. Studies on the fatty acid profile of tilapia meat suggest fortification with polyunsaturated fatty acid (PUFA) to increase the nutritional value. Based on the commercial sterility, sensory evaluation, color, and texture profile analysis F(0) value of 6.94 and cook value of 107.24, with a total process time of 50.24 min at 116 °C was satisfactory for the development of tilapia fish curry in retort pouches. Thermally processed ready to eat south Indian type tilapia fish curry fortified with PUFA was developed and its keeping quality studied at ambient temperature. During storage, a slight increase in the fat content of fish meat was observed, with no significant change in the contents of moisture, protein, and ash. The thiobarbituric acid (TBA) values of fish curry significantly increased during storage. Fish curry fortified with 1% cod liver oil and fish curry without fortification (control) did not show any significant difference in the levels of eicosapentaenoic acid (EPA) and docosahexaenoic acid (DHA), during thermal processing and storage. Sensory analysis revealed that fortification of fish curry with cod liver oil had no impact on the quality. Tilapia fish curry processed at 116 °C and F(0) value of 7.0 (with or without fortification of cod liver oil) was fit for consumption, even after a period of 1-y storage in retort pouch. Tilapia is a lean variety of fish with white flesh and therefore an ideal choice as raw material for the development of ready to serve fish products such as fish curry in retort pouches for both domestic and international markets. Ready to eat thermal processed (116 °C and F(0) value of 7.0) south Indian type tilapia fish curry enriched with PUFA and packed in retort pouch was acceptable for consumption even after a storage period of 1 y at ambient temperature.

  20. AVTA Federal Fleet PEV Readiness Data Logging and Characterization Study for the National Park Service: Golden Gate National Recreation Area

    DOE Office of Scientific and Technical Information (OSTI.GOV)

    Stephen Schey; Jim Francfort

    Battelle Energy Alliance, LLC, managing and operating contractor for the U.S. Department of Energy's Idaho National Laboratory, is the lead laboratory for U.S. Department of Energy Advanced Vehicle Testing. Battelle Energy Alliance, LLC contracted with Intertek Testing Services, North America (ITSNA) to collect data on federal fleet operations as part of the Advanced Vehicle Testing Activity's Federal Fleet Vehicle Data Logging and Characterization study. The Advanced Vehicle Testing Activity study seeks to collect data to validate the utilization of advanced electric drive vehicle transportation. This report focuses on the Golden Gate National Recreation Area (GGNRA) fleet to identify daily operationalmore » characteristics of select vehicles and report findings on vehicle and mission characterizations to support the successful introduction of plug-in electric vehicles (PEVs) into the agencies' fleets. Individual observations of these selected vehicles provide the basis for recommendations related to electric vehicle adoption and whether a battery electric vehicle or plug-in hybrid electric vehicle (PHEV) (collectively PEVs) can fulfill the mission requirements. GGNRA identified 182 vehicles in its fleet, which are under the management of the U.S. General Services Administration. Fleet vehicle mission categories are defined in Section 4, and while the GGNRA vehicles conduct many different missions, only two (i.e., support and law enforcement missions) were selected by agency management to be part of this fleet evaluation. The selected vehicles included sedans, trucks, and sport-utility vehicles. This report will show that battery electric vehicles and/or PHEVs are capable of performing the required missions and providing an alternative vehicle for support vehicles and PHEVs provide the same for law enforcement, because each has a sufficient range for individual trips and time is available each day for charging to accommodate multiple trips per day. These charging events could occur at the vehicle home base, high-use work areas, or intermediately along routes that the vehicles frequently travel. Replacement of vehicles in the current fleet would result in significant reductions in the emission of greenhouse gases and petroleum use, while also reducing fuel costs. The San Francisco Bay Area is a leader in the adoption of PEVs in the United States. PEV charging stations, or more appropriately identified as electric vehicle supply equipment, located on the GGNRA facility would be a benefit for both GGNRA fleets and general public use. Fleet drivers and park visitors operating privately owned PEVs benefit by using the charging infrastructure. ITSNA recommends location analysis of the GGNRA site to identify the optimal placement of the electric vehicle supply equipment station. ITSNA recognizes the support of Idaho National Laboratory and ICF International for their efforts to initiate communication with the National Parks Service and GGNRA for participation in the study. ITSNA is pleased to provide this report and is encouraged by the high interest and support from the National Park Service and GGNRA personnel.« less

Top